  1. Methods and Algorithms for Economic MPC in Power Production Planning

    DEFF Research Database (Denmark)

    Sokoler, Leo Emil

    in real-time. A generator can represent a producer of electricity, a consumer of electricity, or possibly both. Examples of generators are heat pumps, electric vehicles, wind turbines, virtual power plants, solar cells, and conventional fuel-fired thermal power plants. Although this thesis is mainly...... concerned with EMPC for minutes-ahead production planning, we show that the proposed EMPC scheme can be extended to days-ahead planning (including unit commitment) as well. The power generation from renewable energy sources such as wind and solar power is inherently uncertain and variable. A portfolio...... design an algorithm based on the alternating direction method of multipliers (ADMM) to solve input-constrained OCPs with convex objective functions. The OCPs that occur in EMPC of dynamically decoupled subsystems, e.g. power generators, have a block-angular structure. Subsystem decomposition algorithms...

  2. An effective heuristic for combined heat-and-power production planning with power ramp constraints

    International Nuclear Information System (INIS)

    Rong, Aiying; Lahdelma, Risto

    2007-01-01

    Combined heat-and-power (CHP) production is an increasingly important technology for its efficient utilization of primary-energy resources and for reducing CO 2 emissions. In the CHP plant, the generation of heat-and-power follows a joint characteristic, which makes the determination of both the marginal power production cost (MPPC) and the feasible operating region for the plant more complicated than for the power-only generation plant. Due to the interdependence between heat and power production, the power-ramp constraints, which limit how much the power production of a CHP plant may increase or decrease between two successive periods, may also imply constraints on the heat production. In this paper, we investigate the impact of power-ramp constraints on CHP production planning and develop a robust heuristic for dealing with the power-ramp constraints based on the solution to the problem with relaxed ramp-constraints (RRC). Numerical results based on realistic production models show that the heuristic can generate high-quality solutions efficiently. (author)

  3. Slovenske elektrarne has fulfilled the plan of electric power production at 101 %

    International Nuclear Information System (INIS)

    Anon

    2004-01-01

    Slovenske elektrarne, a. s., produced in 2003 year the electric power in capacity 26,047.6 GWh, whereby they fulfilled business plan at 101 %. In compare with the last year it is a reduction in production by 1,397.3 GWh. The biggest share of production - till 68.6 % of overall production of the Slovenske elektrarne, was provided by nuclear sources. Nuclear power plants fulfilled business plan at 104 %, when Jaslovske Bohunice NPP has produced 11,625 GWh and Mochovce NPP 6,238 GWh. The share of other power plants on the electricity production is presented

  4. Plans to expand nuclear power production in Finland

    International Nuclear Information System (INIS)

    Laaksonen, J.

    2002-01-01

    The Finnish Government made in January 2002 a Decision in Principle which concludes that constructing of a new nuclear power plant in Finland is in line with the overall good of the society. The Finnish Parliament ratified the decision in May 2002. Based on this decision, the electricity generating company TVO is authorised to continue preparations for the construction of a new nuclear power plant unit

  5. Production Planning with Respect to Uncertainties. Simulator Based Production Planning of Average Sized Combined Heat and Power Production Plants; Produktionsplanering under osaekerhet. Simulatorbaserad produktionsplanering av medelstora kraftvaermeanlaeggningar

    Energy Technology Data Exchange (ETDEWEB)

    Haeggstaahl, Daniel [Maelardalen Univ., Vaesteraas (Sweden); Dotzauer, Erik [AB Fortum, Stockholm (Sweden)

    2004-12-01

    Production planning in Combined Heat and Power (CHP) systems is considered. The focus is on development and use of mathematical models and methods. Different aspects on production planning are discussed, including weather and load predictions. Questions relevant on the different planning horizons are illuminated. The main purpose with short-term (one week) planning is to decide when to start and stop the production units, and to decide how to use the heat storage. The main conclusion from the outline of pros and cons of commercial planning software are that several are using Mixed Integer Programming (MIP). In that sense they are similar. Building a production planning model means that the planning problem is formulated as a mathematical optimization problem. The accuracy of the input data determines the practical detail level of the model. Two alternatives to the methods used in today's commercial programs are proposed: stochastic optimization and simulator-based optimization. The basic concepts of mathematical optimization are outlined. A simulator-based model for short-term planning is developed. The purpose is to minimize the production costs, depending on the heat demand in the district heating system, prices of electricity and fuels, emission taxes and fees, etc. The problem is simplified by not including any time-linking conditions. The process model is developed in IPSEpro, a heat and mass-balance software from SimTech Simulation Technology. TOMLAB, an optimization toolbox in MATLAB, is used as optimizer. Three different solvers are applied: glcFast, glcCluster and SNOPT. The link between TOMLAB and IPSEpro is accomplished using the Microsoft COM technology. MATLAB is the automation client and contains the control of IPSEpro and TOMLAB. The simulator-based model is applied to the CHP plant in Eskilstuna. Two days are chosen and analyzed. The optimized production is compared to the measured. A sensitivity analysis on how variations in outdoor

  6. Optimization of the production plan and risk control in Third Qinshan Nuclear Power Co.,Ltd

    International Nuclear Information System (INIS)

    Zhou Jun

    2009-01-01

    Some optimized and improved measures have been taken in Third Qinshan Nuclear Power Co., Ltd. (TQNPC) to optimize the routine production plan management, strengthen the maintenance work risk analysis, and improve the plan execution capability. Which involve unified management of generation, refueling, periodic test and maintenance plans; simplifying the defect scale and reducing the intermediate link of defect treatment; intensifying the appraisal on plan execution and adopting star performance evaluation and merit rating measures. In this paper, the above-mentioned improvement and optimization are introduced comprehensively and systematically. (authors)

  7. Stochastic Optimization in The Power Management of Bottled Water Production Planning

    Science.gov (United States)

    Antoro, Budi; Nababan, Esther; Mawengkang, Herman

    2018-01-01

    This paper review a model developed to minimize production costs on bottled water production planning through stochastic optimization. As we know, that planning a management means to achieve the goal that have been applied, since each management level in the organization need a planning activities. The built models is a two-stage stochastic models that aims to minimize the cost on production of bottled water by observing that during the production process, neither interfernce nor vice versa occurs. The models were develop to minimaze production cost, assuming the availability of packing raw materials used considered to meet for each kind of bottles. The minimum cost for each kind production of bottled water are expressed in the expectation of each production with a scenario probability. The probability of uncertainly is a representation of the number of productions and the timing of power supply interruption. This is to ensure that the number of interruption that occur does not exceed the limit of the contract agreement that has been made by the company with power suppliers.

  8. PLAN 2003. Costs for management of the radioactive waste products from nuclear power production

    International Nuclear Information System (INIS)

    2003-06-01

    The companies that own nuclear power plants in Sweden are responsible for adopting measures needed to manage and dispose of spent nuclear fuel and radioactive waste from the Swedish nuclear power reactors in a safe manner. The so-called Financing Act (1992:1537) is linked to this responsibility and prescribes that a reactor owner, in consultation with other reactor owners, shall calculate the cost for management and disposal of the spent fuel and radioactive waste and for decommissioning and dismantling of the reactor plant. The reactor owner shall annually submit to the regulatory authority the cost data that are required for calculation of the fees to be imposed on electricity production during the ensuing year and of the guarantees that must be given as security for costs not covered by paid-in fees. The reactor owners have jointly commissioned SKB to calculate and compile these costs. This report presents a calculation of the costs for implementing all of these measures. The cost calculations are based on the plan for management and disposal of the radioactive waste that has been prepared by SKB and is described in this report. The following facilities and systems are in operation: Transportation system for radioactive waste products; Central interim storage facility for spent nuclear fuel, CLAB; Final repository for radioactive operational waste, SFR 1. Plans also exist for: Canister factory and encapsulation plant for spent nuclear fuel; Deep repository for spent nuclear fuel; Final repository for long-lived low- and intermediate-level waste; Final repository for decommissioning waste. The cost calculations also include costs for research, development and demonstration, as well as for decommissioning and dismantling the reactor plants. This report is based on the proposed strategy for the activities which is presented in SKB's RD and D-Programme 2001 and in the supplementary account to RD and D-Programme 98 which SKB submitted to the regulatory authority. The

  9. PLAN 2003. Costs for management of the radioactive waste products from nuclear power production

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-06-01

    The companies that own nuclear power plants in Sweden are responsible for adopting measures needed to manage and dispose of spent nuclear fuel and radioactive waste from the Swedish nuclear power reactors in a safe manner. The so-called Financing Act (1992:1537) is linked to this responsibility and prescribes that a reactor owner, in consultation with other reactor owners, shall calculate the cost for management and disposal of the spent fuel and radioactive waste and for decommissioning and dismantling of the reactor plant. The reactor owner shall annually submit to the regulatory authority the cost data that are required for calculation of the fees to be imposed on electricity production during the ensuing year and of the guarantees that must be given as security for costs not covered by paid-in fees. The reactor owners have jointly commissioned SKB to calculate and compile these costs. This report presents a calculation of the costs for implementing all of these measures. The cost calculations are based on the plan for management and disposal of the radioactive waste that has been prepared by SKB and is described in this report. The following facilities and systems are in operation: Transportation system for radioactive waste products; Central interim storage facility for spent nuclear fuel, CLAB; Final repository for radioactive operational waste, SFR 1. Plans also exist for: Canister factory and encapsulation plant for spent nuclear fuel; Deep repository for spent nuclear fuel; Final repository for long-lived low- and intermediate-level waste; Final repository for decommissioning waste. The cost calculations also include costs for research, development and demonstration, as well as for decommissioning and dismantling the reactor plants. This report is based on the proposed strategy for the activities which is presented in SKB's RD and D-Programme 2001 and in the supplementary account to RD and D-Programme 98 which SKB submitted to the regulatory authority

  10. PLAN 98 - Costs for management of the radioactive waste from nuclear power production

    International Nuclear Information System (INIS)

    1998-06-01

    The nuclear utilities in Sweden are responsible for managing and disposing of spent nuclear fuel and radioactive waste from the nuclear power reactors in a safe manner. The most important measures are to plan, build and operate the facilities and systems needed, and to conduct related R and D. This report presents a calculation of the costs for implementing all of these measures. The following facilities and systems are in operation: Transportation system for radioactive waste products. Central interim storage facility for spent nuclear fuel, CLAB. Final repository for radioactive operational waste, SFR I. Plans also exist for: Encapsulation plant for spent nuclear fuel. Deep repository for spent fuel and other long-lived waste. Final repository for decommissioning waste. The cost calculations also include costs for research, development and demonstration, as well as for decommissioning and dismantling the reactor plants etc. At the end of 1995, certain amendments were made in the Financing Act which influence the calculations presented in this report. The most important amendment is that the reactor owners, besides paying a fee or charge on nuclear energy production, must also give guarantees as security for remaining costs. In this way the fee can be based on a probable cost for waste management. This cost includes uncertainties and variations that are normal for this type of project. Cost increases as a consequence of major changes, disruptions etc. can instead be covered via the given guarantees. The total future costs, in January 1998 prices, for the Swedish waste management system from 1999 onward has been calculated to be SEK 45.8 billion. The total costs apply for the waste obtained from 25 years of operation of all Swedish reactors. They will fall due over a total period of approximately 50 years up to the middle of the 2l st century, but the greater part will fall due during the next 20 years. It is estimated that SEK 12.1 billion in current money terms

  11. Production planning of combined heat and power plants with regards to electricity price spikes : A machine learning approach

    OpenAIRE

    Fransson, Nathalie

    2017-01-01

    District heating systems could help manage the expected increase of volatility on the Nordic electricity market by starting a combined heat and power production plant (CHP) instead of a heat only production plant when electricity prices are expected to be high. Fortum Värme is interested in adjusting the production planning of their district heating system more towards high electricity prices and in their system there is a peak load CHP unit that could be utilised for this purpose. The econom...

  12. Plan 96 - Costs for management of the radioactive waste from nuclear power production

    International Nuclear Information System (INIS)

    1996-06-01

    This report presents a calculation of the costs for implementing all measures needed to manage and dispose of spent nuclear fuel and radioactive wastes from the Swedish nuclear power reactors. The cost calculations include costs for R,D and D as well as for decommissioning and dismantling the reactor plants etc. The following facilities and systems are already in operation: Transportation system for radioactive waste products, Central interim storage facility for spent nuclear fuel, Final repository for radioactive operational wastes. Plans exist for: Encapsulation plant for spent nuclear fuel, Deep repository for spent fuel and other long-lived waste, Final repository for decommissioning waste. The total future costs, in Jan 1996 prices, for the Swedish waste system from 1997 have been calculated to be 42.2 billion SEK (about 6.4 billion USD). The total costs apply for the waste obtained from 25 years of operation of all Swedish reactors. It is estimated that 10.6 billion SEK in current money has been spent through 1996. Costs based on waste quantities from operation of the reactors for 40 years are also reported. 6 refs

  13. Power system generation expansion planning using the maximum principle and analytical production cost model

    International Nuclear Information System (INIS)

    Lee, K.Y.; Park, Y.M.

    1991-01-01

    Historically, the electric utility demand in most countries has increased rapidly, with a doubling of approximately 10 years in the case of developing countries. In order to meet this growth in demand, the planners of expansion policies were concerned with obtaining expansion pans which dictate what new generation facilities to add and when to add them. This paper reports that, however, the practical planning problem is extremely difficult and complex, and required many hours of the planner's time even though the alternatives examined were extremely limited. In this connection, increased motivation for more sophisticated techniques of valuating utility expansion policies has been developed during the past decade. Among them, the long-range generation expansion planning is to select the most economical and reliable generation expansion plans in order to meet future power demand over a long period of time subject to a multitude of technical, economical, and social constraints

  14. Combined heat and power production planning in a waste-to-energy plant on a short-term basis

    International Nuclear Information System (INIS)

    Touš, Michal; Pavlas, Martin; Putna, Ondřej; Stehlík, Petr; Crha, Lukáš

    2015-01-01

    In many cases, WtE (waste-to-energy) plants are CHP (combined heat and power) producers. They are often integrated into a central heating system and they also export electricity to the grid. Therefore, they have to plan their operation on a long-term basis (months, years) as well as on a short-term basis (hours, days). Simulation models can effectively support decision making in CHP production planning. In general, CHP production planning on a short-term basis is a challenging task for WtE plants. This article presents a simulation based support. It is demonstrated on an example involving a real WtE plant. Most of the models of relevant WtE sub-systems (boilers, steam turbine) are developed using operational data and applying linear regression and artificial neural network technique. The process randomness given mainly by fluctuating heating value of waste leads to uncertainty in a calculation of CHP production and a stochastic approach is appropriate. The models of the sub-systems are, therefore, extended of a stochastic part and Monte-Carlo simulation is applied. Compared to the current planning strategy in the involved WtE plant, the stochastic simulation based planning provides increased CHP production resulting in better net thermal efficiency and increased revenue. This is demonstrated through a comparison using real operational data. - Highlights: • Introduction of a stochastic model of a CHP production in a waste-to-energy plant. • An application of the model for the next day CHP production planning. • Better net thermal efficiency and therefore increased revenue achieved.

  15. An efficient algorithm for bi-objective combined heat and power production planning under the emission trading scheme

    International Nuclear Information System (INIS)

    Rong, Aiying; Figueira, José Rui; Lahdelma, Risto

    2014-01-01

    Highlights: • Define fuel mix setting for the bi-objective CHP environmental/economic dispatch. • Develop an efficient algorithm for constructing the Pareto frontier for the problem. • Time complexity analysis is conducted for the proposed algorithm. • The algorithm is theoretically compared against a traditional algorithm. • The efficiency of the algorithm is justified by numerical results. - Abstract: The growing environmental awareness and the apparent conflicts between economic and environmental objectives turn energy planning problems naturally into multi-objective optimization problems. In the current study, mixed fuel combustion is considered as an option to achieve tradeoff between economic objective (associated with fuel cost) and emission objective (measured in CO 2 emission cost according to fuels and emission allowance price) because a fuel with higher emissions is usually cheaper than one with lower emissions. Combined heat and power (CHP) production is an important high-efficiency technology to promote under the emission trading scheme. In CHP production, the production planning of both commodities must be done in coordination. A long-term planning problem decomposes into thousands of hourly subproblems. In this paper, a bi-objective multi-period linear programming CHP planning model is presented first. Then, an efficient specialized merging algorithm for constructing the exact Pareto frontier (PF) of the problem is presented. The algorithm is theoretically and empirically compared against a modified dichotomic search algorithm. The efficiency and effectiveness of the algorithm is justified

  16. Philippines revises power plans

    Energy Technology Data Exchange (ETDEWEB)

    Hayes, D.

    1988-02-01

    Following an unexpected surge in electricity demand the Philippines has revised its medium term power development programme. The sharp increase in electricity consumption follows three years of slack demand due to civil disturbances before the end of the Macros administration and the election of Corazon Aquino as President in 1986. Originally, the Aquino government's medium term power development plans called for about 500MW of generating capacity to be installed between 1986 and 1992. The three proposed plants were scheduled for commissioning in 1991 and 1992. However, a spurt in power demand growth during the past nine months has caused concern among industrialists that power shortages could occur by the end of the decade. So additional capacity will be installed to prevent an anticipated shortfall in electricity supplies by the early 1990s.

  17. Integrated Wind Power Planning Tool

    DEFF Research Database (Denmark)

    Rosgaard, M. H.; Giebel, Gregor; Nielsen, T. S.

    2012-01-01

    model to be developed in collaboration with ENFOR A/S; a danish company that specialises in forecasting and optimisation for the energy sector. This integrated prediction model will allow for the description of the expected variability in wind power production in the coming hours to days, accounting......This poster presents the current state of the public service obligation (PSO) funded project PSO 10464, with the working title "Integrated Wind Power Planning Tool". The project commenced October 1, 2011, and the goal is to integrate a numerical weather prediction (NWP) model with purely...

  18. Report to the parliament. Pluri-annual planning of power production investments; Rapport au parlement. Programmation pluriannuelle des investissements de production electrique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-01-01

    The article 6 of the law from February 10, 2000, relative to the modernization and development of the electric utility, schedules a pluri-annual planning of the production investments (PPI) which represents a concrete translation of the energy policy in the domain of electricity. The PPI will allow to reach the energy policy goals using a balanced development of the national production means in terms of primary energy sources, techniques of production and geographical distribution of investments. This document is the first PPI report to the parliament. It is based on the scheme of energy collective services and on a provisional status made by the manager of the transportation network (RTE). In 2010, renewable energies should cover 21% of the French electricity needs. This ratio will be reached mainly thanks to the development of wind power (7000 to 14000 MW of installed power, which represents 20 to 35 TWh of additional production). Hydro-power should be increased of 8 TWh max, depending on the public policies implemented, and biomass will have a significant contribution too. On the other hand, actions of mastery of the electricity demand will have to be implemented. From 2008 onward, the decommissioning of several power plants will impose to find new solutions to satisfy the peak power needs. The covering of consumption peaks requires a correlation study of the power peaks at the European scale. Finally, the situation of non-interconnected areas and of areas with fragile supply has been carefully considered. The creation of new power production means must be envisaged in most of these areas. (J.S.)

  19. 15 years of production of electric energy of the Laguna Verde power plant, its plans and future

    International Nuclear Information System (INIS)

    Rivera C, A.

    2005-01-01

    In the year 2005 Laguna Verde power plant reaches 15 years of producing electric power in Mexico arriving to but of 100 million Megawatts-hour from their beginning of commercial activities. The Unit 1 that entered at July 29, 1990 and the Unit 2 at April 10, 1995, obtaining the Disposability Factors from their origin is: 84.63% in Unit 1 and 83.67% in Unit 2. The march of the X XI century gives big challenges of competition to the Laguna Verde Central, with the possible opening of the electric market to private investment, for their Goals and Objectives of a world class company, taking the evaluation system and qualification of the World Association of Nuclear Operators (WANO) that promotes the Excellence in the operation of the nuclear power stations in all their partners. This Association supports the development of programs that allow the monitoring of the behavior in Safety Culture, Human fulfilment, Equipment reliability, Industrial Safety, Planning, Programming and Control, Personalized Systematic Training, and the use of the Operational experience in the daily tasks. The present work tries to explain the system of evaluation/qualification of WANO, the definition of Goals and Objectives to reach the excellence and of the programs, it will present the Program of the Reliability of Equipment with its main actions the productivity. (Author)

  20. On optimization of power production

    Energy Technology Data Exchange (ETDEWEB)

    Feltenmark, S.

    1997-01-01

    Short-term optimization of power production is treated. It concerns the problem of determining a production schedule for a power system, which minimizes the total cost of production, while satisfying various constraints. The thesis consists of an introductory chapter, four chapters that each concerns a specific problem area (economic dispatch, unit commitment, hydro power planning and cogeneration optimization), plus a chapter with relevant theory. The emphasis of the thesis is on the mathematical structures that arise in problems in this field, and how to exploit them algorithmically. A recurring theme is convexification, either implicit, by dualization, or explicit, as in our approach to hydro power optimization. 134 refs

  1. Bringing Power to Planning Research

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2002-01-01

    This article provides an answer to what has been called the biggest problem in theorizing and understanding planning, namely the ambivalence about power found among planning researchers, theorists, and students. The author narrates how he came to work with issues of power. He then gives an example......-rational questions: (1) Where are we going with planning? (2) Who gains and who loses, and by which mechanisms of power? (3) Is this development desirable? (4) What should be done? These questions are exemplified for a specific instance of Scandinavian urban planning. The author finds that the questions...

  2. Bringing Power to Planning Research

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    This article provides an answer to what has been called the biggest problem in theorizing and understanding planning, namely the ambivalence about power found among planning researchers, theorists, and students. The author narrates how he came to work with issues of power. He then gives an example......-rational questions: (1) Where are we going with planning? (2) Who gains and who loses, and by which mechanisms of power? (3) Is this development desirable? (4) What should be done? These questions are exemplified for a specific instance of Scandinavian urban planning. The author finds that the questions...

  3. Nuclear power programme planning: An integrated approach

    International Nuclear Information System (INIS)

    2001-12-01

    The International Atomic Energy Agency (IAEA) has published material on different policy considerations in the introduction of nuclear power, primarily addressed to top level decision makers in government and industry in Member States. Several Member States and experts recommended to the IAEA to address the aspects of an integrated approach to nuclear power programme planning and to serve as guidance to those countries wishing to embark on a nuclear power programme. As a follow-up, the present publication is primarily intended to serve as guidance for executives and managers in Member States in planning for possible introduction of nuclear power plants in their electricity generating systems. Nuclear power programme planning, as dealt with in this publication, includes all activities that need to be carried out up to a well-founded decision to proceed with a project feasibility study. Project implementation beyond this decision is not in the scope of this publication. Although it is possible to use nuclear energy as a heat source for industrial processes, desalination and other heat applications, it is assumed in this publication that the planning is aimed towards nuclear power for electricity generation. Much of the information given would, however, also be relevant for planning of nuclear reactors for heat production. The publication was prepared within the framework of the IAEA programme on nuclear power planning, implementation and performance as a joint activity of the Nuclear Power Engineering Section and the Planning and Economic Studies Section (Division of Nuclear Power)

  4. Integrated Wind Power Planning Tool

    DEFF Research Database (Denmark)

    Rosgaard, M. H.; Hahmann, Andrea N.; Nielsen, T. S.

    This poster describes the status as of April 2012 of the Public Service Obligation (PSO) funded project PSO 10464 \\Integrated Wind Power Planning Tool". The project goal is to integrate a meso scale numerical weather prediction (NWP) model with a statistical tool in order to better predict short...... term power variation from off shore wind farms, as well as to conduct forecast error assessment studies in preparation for later implementation of such a feature in an existing simulation model. The addition of a forecast error estimation feature will further increase the value of this tool, as it...

  5. Pluri-annual planning of power generation investments. 2005-2015 era; Programmation pluriannuelle des investissements de production electrique. Periode 2005-2015

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The pluri-annual planning of power generation investments (PPI) is provided by article 6 of the law from February 10, 2000 relative to the modernization and development of the electric utility. The PPI is the concrete translation of the energy policy and aims to identify the necessary investments with respect to the security of power supplies and beyond the already known commitments. In the framework of market deregulation and respect of competition, the PPI is limited to the identification of such investments but not to their realization. This document, which corresponds to the 2005 exercise, is the second report to the Parliament. It stresses on the following points: the mastery of power demand and the demand scenarios, the level of accepted risk, the carrying out of the development of renewable energy sources (5 GW by 2010 and 12.5 GW by 2016 for wind power, and 6 TWh more for biomass by 2016), the start-up of an EPR reactor in 2012, the investment needs for classical thermal power plants (+2.6 GW of diesel fuel power plants and +500 MW of combustion turbines as decided by EdF), the development of production means in 2 regions with specific needs: Provence-Alpes-Cote d'Azur and Bretagne (Brittany), and also in insular areas (Corsica and overseas territories), and the reflexions to carry on in continuation of the PPI. (J.S.)

  6. Decentralized planning of hydroelectric power systems

    International Nuclear Information System (INIS)

    Binato, S.; Pereira, M.V.F.

    1995-01-01

    This paper discusses the application of marginal cost concepts to the expansion planning of hydroelectric systems. It is shown that the renumeration of hydroelectric plants should not be based on their energy production, as this leads to excessive revenues for the plant owner, and distorts the dimensioning of upstream reservoirs. In order to produce the adequate economic signals, it is necessary to separate the contributions of turbines and reservoirs. Examples from the Brazilian power system are presented and discussed

  7. Plan 2010. Costs starting in 2012 for the radioactive residual products from nuclear power. Basis for fees and guarantees during the period 2012-2014

    International Nuclear Information System (INIS)

    2010-12-01

    According to the current regulatory framework, it is the responsibility of the holder of a licence to own or operate a nuclear power reactor to prepare a calculation of the costs for all measures that are needed for the management and disposal of spent nuclear fuel that has been used in the reactors and other radioactive waste products and to decommission and dismantle the reactor plants. The regulatory framework comprises the Act (2006:647) and the Ordinance (2008:715) on Financial Measures for the Management of Residual Products from Nuclear Activities (hereinafter referred to as the Financing Act and the Financing Ordinance, respectively). This cost calculation shall be submitted periodically to the Government or the authority designated by the Government. SKB's owners have assigned SKB the task of preparing such a cost calculation jointly for the licensees of the Swedish nuclear power plants. The present report, which is the twenty-eighth annual plan report, gives an updated compilation of these costs. As in previous years' reports, the costs are shown for two cases. The first case concerns the system as a whole, including management and disposal of radioactive operational waste plus certain waste deriving from other facilities than those belonging to SKB's owners. This case has been based on a scenario concerning reactor operation that is based on the nuclear power plant owners' current planning. The second case concerns the system with the restrictions that follow from the regulatory framework, which stipulates the time for operation of the reactors that is supposed to serve as a basis for fees. The report is divided into three parts: Chapter 1 provides background information regarding the Financing Act and SKB's calculation model. Chapter 2 provides information on the underlying calculation, which is based on current plans for reactor operation and SKB's activities. Chapter 3 presents the cost estimates required by the Financing Act that are the primary

  8. Decision project related to the energy multi-year 2018/2023 planning (PPE). Evolution of capacities of production of power generating renewable energies: the headlong rush

    International Nuclear Information System (INIS)

    Perves, Jean-Pierre

    2016-01-01

    After having recalled that the French government, in its energy multi-year planning for 2018-2023, decided to develop wind and photovoltaic energies at a higher rate, despite their intermittency and the need for back-up nuclear and hydroelectric power plants (which do not emit carbon), and outlined that the power market is now in the torment, in France and in Europe, the author notices that such a development of renewable energies is a matter of concern in Europe, and indicates the objectives defined by the French government for onshore and offshore wind energy and for solar energy. Then, he proposes a critical analysis of the low level scenario of this development, a scenario which the author assesses as not very realistic. A table indicates the status and objectives for all the different renewable energies. The author discusses these values, notices that it is similar to a programme defined by the ADEME. He analyses the 2018/2023 low scenario (production, share, production efficiency, minimum and maximum power) by comparing it with the situation in 2015. He outlines important seasonal variations for wind and solar energy: their production level in winter requires a massive use of other sources. He briefly discusses the perspectives for 2030, and then addresses the development cost in terms of required investments. He discusses the impact of the scenario on greenhouse gas emissions. The appendix provides the official text of the decision project

  9. Nuclear power planning study for Bangladesh

    International Nuclear Information System (INIS)

    1975-01-01

    The country's interest in and plans for nuclear power, as well as the organizational setup and involvement of the Bangladesh Atomic Energy Commission in the planning, construction and operation of nuclear power plants, are described. The report contains some data on population, general economics, gross national product, mineral resources and energy consumption. The electricity supply system, its development, generating and transmission facilities, costs of existing plants and plants under construction, various systems operation criteria, economic criteria and technical data on existing generating units are given. A number of appendixes have been included to provide additional and background information on the computer programs, methods of forecasting load, methodology and parameters used, fossil and nuclear fuel costs, general technical and economic data on thermal and nuclear plants, and other appropriate data

  10. Power Producer Production Valuation

    Directory of Open Access Journals (Sweden)

    M. Kněžek

    2008-01-01

    Full Text Available The ongoing developments in the electricity market, in particular the establishment of the Prague Energy Exchange (PXE and the associated transfer from campaign-driven sale to continuous trading, represent a significant change for power companies.  Power producing companies can now optimize the sale of their production capacities with the objective of maximizing profit from wholesale electricity and supporting services. The Trading Departments measure the success rate of trading activities by the gross margin (GM, calculated by subtracting the realized sales prices from the realized purchase prices and the production cost, and indicate the profit & loss (P&L to be subsequently calculated by the Control Department. The risk management process is set up on the basis of a business strategy defining the volumes of electricity that have to be sold one year and one month before the commencement of delivery. At the same time, this process defines the volume of electricity to remain available for spot trading (trading limits. 

  11. Plan 2010. Costs starting in 2012 for the radioactive residual products from nuclear power. Basis for fees and guarantees during the period 2012-2014

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    According to the current regulatory framework, it is the responsibility of the holder of a licence to own or operate a nuclear power reactor to prepare a calculation of the costs for all measures that are needed for the management and disposal of spent nuclear fuel that has been used in the reactors and other radioactive waste products and to decommission and dismantle the reactor plants. The regulatory framework comprises the Act (2006:647) and the Ordinance (2008:715) on Financial Measures for the Management of Residual Products from Nuclear Activities (hereinafter referred to as the Financing Act and the Financing Ordinance, respectively). This cost calculation shall be submitted periodically to the Government or the authority designated by the Government. SKB's owners have assigned SKB the task of preparing such a cost calculation jointly for the licensees of the Swedish nuclear power plants. The present report, which is the twenty-eighth annual plan report, gives an updated compilation of these costs. As in previous years' reports, the costs are shown for two cases. The first case concerns the system as a whole, including management and disposal of radioactive operational waste plus certain waste deriving from other facilities than those belonging to SKB's owners. This case has been based on a scenario concerning reactor operation that is based on the nuclear power plant owners' current planning. The second case concerns the system with the restrictions that follow from the regulatory framework, which stipulates the time for operation of the reactors that is supposed to serve as a basis for fees. The report is divided into three parts: Chapter 1 provides background information regarding the Financing Act and SKB's calculation model. Chapter 2 provides information on the underlying calculation, which is based on current plans for reactor operation and SKB's activities. Chapter 3 presents the cost estimates required by the Financing

  12. Kuroshio power plant development plan

    International Nuclear Information System (INIS)

    Chen, Falin

    2010-01-01

    As a country lacking energy reserves, Taiwan imports 99.2% of its energy, with only a small portion of indigenous energy, such as hydro, wind, and solar. In 2008, each Taiwanese spent 85,000 NTD dollars (1 USD ∝ 32 NTD) to purchase oil, coal, gas, and nuclear fuel from foreign countries, accounting for a total payment of 1.8 trillion NTD, more than the annual budget of the Taiwan government of 1.7 trillion NTD. In the same year, Taiwan emitted about 1% of the world's greenhouse gas (GHG), or 12 tons per person-year, ranking 18th globally. These situations in terms of energy security and carbon emission are very severe. To resolve these severe situations, harnessing the power of the Kuroshio in eastern Taiwan offers a great opportunity. The Kuroshio is a branch of the North Pacific Ocean current. Due to the westward-enhanced effect, this ocean current is strong and stable as it passes through eastern Taiwan. The flow rate is about 30 sverdrup (Sv) or 1000 times that of the Yangtze River, the average speed is 1 m/s, the flow direction is fixed to the north, and the flow path is close to the east coast of Taiwan. By precisely locating high-quality sites and implementing sequential works with careful planning, one can possibly generate exploitable power more than 30 GW. With 30 GW of clean energy, Taiwan could effectively enhance energy security, reduce GHG emission, and lower energy-purchasing cost. This paper proposes a feasibility study to explore the power of the Kuroshio. The content consists of four parts: (1) assessment of Kuroshio power reserves, (2) development of turbine generators, (3) development of turbine-anchor system, and (4) deep-sea marine engineering of turbine clusters. By integrating these technologies above, we propose a project to construct a 30 MW pilot plant. In this project, we also discuss the financial analysis and propose new regulations, environmental impact analysis, risk assessment, and other relevant issues. (author)

  13. Thermal electric power production

    International Nuclear Information System (INIS)

    Boehmer, S.

    2001-01-01

    known as 'Coal combustion product' (CCP) are generated and cause enormous problems of disposal. This work gives an overlook of solid residues generation in a coal fired power plant. In dry bottom furnaces the major part of solid residues (up to 90 %) is retained as fly ash by particulate control devices, whereas in wet bottom furnaces the predominant waste fraction is bottom ash (up to 85 % of the total residue generation). (author)

  14. Tracking sentence planning and production.

    Science.gov (United States)

    Kemper, Susan; Bontempo, Daniel; McKedy, Whitney; Schmalzried, RaLynn; Tagliaferri, Bruno; Kieweg, Doug

    2011-03-01

    To assess age differences in the costs of language planning and production. A controlled sentence production task was combined with digital pursuit rotor tracking. Participants were asked to track a moving target while formulating a sentence using specified nouns and verbs and to continue to track the moving target while producing their response. The length of the critical noun phrase (NP) as well as the type of verb provided were manipulated. The analysis indicated that sentence planning was more costly than sentence production, and sentence planning costs increased when participants had to incorporate a long NP into their sentence. The long NPs also tended to be shifted to the end of the sentence, whereas short NPs tended to be positioned after the verb. Planning or producing responses with long NPs was especially difficult for older adults, although verb type and NP shift had similar costs for young and older adults. Pursuit rotor tracking during controlled sentence production reveals the effects of aging on sentence planning and production.

  15. Small scale power production

    Energy Technology Data Exchange (ETDEWEB)

    Muoniovaara, M [IVO International Ltd, Vantaa (Finland)

    1997-12-31

    IVO International is a major constructor of biomass power plants in Finland and abroad. As a subsidiary of Imatran Voima Oy, the largest power utility in Finland, it has designed and constructed ten power plants owned by IVO Group or others capable of burning biomasses. Sizes of the plants vary from the world`s largest condensing peat-fired power plant of 155 MWe to a 6 MWe combined heat and power producing unit. This article describes the biomass power plants designed and constructed by IVO Group 3 refs.

  16. Small scale power production

    Energy Technology Data Exchange (ETDEWEB)

    Muoniovaara, M. [IVO International Ltd, Vantaa (Finland)

    1996-12-31

    IVO International is a major constructor of biomass power plants in Finland and abroad. As a subsidiary of Imatran Voima Oy, the largest power utility in Finland, it has designed and constructed ten power plants owned by IVO Group or others capable of burning biomasses. Sizes of the plants vary from the world`s largest condensing peat-fired power plant of 155 MWe to a 6 MWe combined heat and power producing unit. This article describes the biomass power plants designed and constructed by IVO Group 3 refs.

  17. PLANNING VESSEL BODY SECTION PRODUCTION

    Directory of Open Access Journals (Sweden)

    A. G. Grivachevsky

    2015-01-01

    Full Text Available A problem of planning production of a vessel body section is considered. The problem is reduced to the classic Johnson’s tree-machine flow-shop scheduling problem. A genetic algorithm and computer experiment to compare efficiency of this algorithm and the algorithm of full enumeration are described.

  18. Communicative planning as counter-power

    DEFF Research Database (Denmark)

    Elling, Bo

    2017-01-01

    This article presents a theory of communicative planning in which the power of citizens is conceived as a resource in the promotion of long-term planning against the short-term interests of investors in public planning. Its point of departure is the depiction of three planning paradigms – traditi......This article presents a theory of communicative planning in which the power of citizens is conceived as a resource in the promotion of long-term planning against the short-term interests of investors in public planning. Its point of departure is the depiction of three planning paradigms...... – traditional synoptic, incremental and participatory planning – and a critical discussion of different theories within the latter. In the light of this, it is argued that, in practice, planning authorities most often regard public participation as a problem, rather than as a potential. The article dismisses...... this conception and (a) conceptualizes planning on the basis of a Habermasian theory of communicative action and power, (b) shows that the participation of citizens is necessary to secure the inclusion of ethical and aesthetic rationalities in the planning process, and also that (c) citizens may constitute...

  19. Danish emergency plan for Barsebaeck Power Plant

    International Nuclear Information System (INIS)

    1981-01-01

    A revised edition of the Danish emergency plan for the Swedish Power Plant Barsebaeck (about 20 km from the Danish Territory) is prepared at the request of Environmental Council in cooperation with police management and civil defense organisations. The plan is valid from October 1981. The emergency plan defines the emergency organization and the provisions to be taken quickly to protect the population if it is exposed to ionizing radiation from release of radioactive effluents as a result of an accident in the Barsebaeck power plant. The emergency plan is based upon Regulation no. 278, June 27, 1963 and Regulation no. 502, October 1, 1974. (EG)

  20. Offshore Wind Power Planning in Korea

    DEFF Research Database (Denmark)

    Seo, Chul Soo; Cha, Seung-Tae; Park, Sang Ho

    2012-01-01

    this possible, Korea has announced the National offshore power roadmap and is now in pursuit. However, large scale offshore wind farms can incur many problems, such as power quality problems, when connecting to a power system.[1][2] Thus, KEPCO is on the process of a research study to evaluate the effects...... that connecting offshore wind power generation to a power system has on the power system. This paper looks over offshore wind power planning in Korea and describes the development of impact assessment technology of offshore wind farms.......Wind power generation is globally recognized as the most universal and reliable form of renewable energy. Korea is currently depending mostly on coal and petroleum to generate electrical power and is now trying to replace them with renewable energy such as offshore wind power generation. To make...

  1. Nuclear power infrastructure and planning

    International Nuclear Information System (INIS)

    2005-01-01

    There are several stages in the process of introducing nuclear power in a country. These include feasibility studies; technology evaluation; request for proposals and proposal evaluation; project and contracts development and financing; supply, construction, and commissioning; and finally operation. The IAEA is developing guidance directed to provide criteria for assessing the minimum infrastructure necessary for: a) a host country to consider when engaging in the implementation of nuclear power, or b) a supplier country to consider when assessing that the recipient country would be in an acceptable condition to begin the implementation of nuclear power. There are Member States that may be denied the benefits of nuclear energy if the infrastructure requirements are too large or onerous for the national economy. However if co-operation could be achieved, the infrastructure burden could be shared and economic benefits gained by several countries acting jointly. The IAEA is developing guidance on the potential for sharing of nuclear power infrastructure among countries adopting or extending nuclear power programme

  2. Nuclear power and energy planning

    International Nuclear Information System (INIS)

    Jones, P.

    1990-11-01

    With the rapid depletion of conventional energy sources such as coal and oil and the growing world demand for energy the question of how to provide the extra energy needed in the future is addressed. Relevant facts and figures are presented. Coal and oil have disadvantages as their burning contributes to the greenhouse gases and they will become scarcer and more expensive. Renewable sources such as wind and wave power can supply some but not all future energy requirements. The case made for nuclear power is that it is the only source which offers the long term prospect of meeting the growing world energy demand whilst keeping energy costs close to present levels and which does not add to atmospheric pollution. Reassurance as to the safety of nuclear power plants and the safe disposal of radioactive wastes is given. (UK)

  3. New Production Reactors Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs.

  4. New Production Reactors Program Plan

    International Nuclear Information System (INIS)

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs

  5. Plan 2008. Costs starting in 2010 for the radioactive residual products from nuclear power. Basis for fees and guarantees in 2010 and 2011

    International Nuclear Information System (INIS)

    2008-12-01

    A company that has a licence to own a nuclear power plant is responsible for adopting whatever measures are needed for safe management and disposal of spent nuclear fuel and radioactive waste deriving from it and for decommissioning and dismantling of the reactor plants after they have been taken out of service. The most important measures are to plan, build and operate the facilities and systems that are needed for this, and to conduct related research and development. The financing of these measures is based on payment of fees to a fund by the licensees, primarily during the period the reactors are in operation, but also later if need be. The details of this financing are regulated in the so called Financing Act (2006:647) with associated Ordinance (2008:715)1. SKB has the task of calculating and compiling the future costs for the four licensees. The future costs are based on SKB's current planning regarding the design of the system and the timetable for its execution. The current design is called the reference design, while the planning around it is called the reference scenario. This report is based on the proposed plan of the activities that has been presented in SKB's RDandD Programme 2007 and the most recent activity plan. The quantity of spent nuclear fuel to be managed in this scenario is based on an operating time of 50 years for each of the Forsmark and Ringhals reactors and 60 years for the Oskarshamn reactors, rounded off to fuel equivalent to 6,000 copper canisters. Preparations are currently being made by SKB for selection of the site for the final repository for nuclear fuel. The goal is that one of the two sites where the site investigations (now almost completed) have been carried out will be chosen. The cost calculations are based on the assumption of Forsmark as the site in the reference scenario. This choice has been for optimal illumination of different cost aspects and must not be regarded as a commitment on the part of SKB. The reference

  6. Preferences in Data Production Planning

    Science.gov (United States)

    Golden, Keith; Brafman, Ronen; Pang, Wanlin

    2005-01-01

    This paper discusses the data production problem, which consists of transforming a set of (initial) input data into a set of (goal) output data. There are typically many choices among input data and processing algorithms, each leading to significantly different end products. To discriminate among these choices, the planner supports an input language that provides a number of constructs for specifying user preferences over data (and plan) properties. We discuss these preference constructs, how we handle them to guide search, and additional challenges in the area of preference management that this important application domain offers.

  7. Plan 2008. Costs starting in 2010 for the radioactive residual products from nuclear power. Basis for fees and guarantees in 2010 and 2011

    Energy Technology Data Exchange (ETDEWEB)

    2008-12-15

    A company that has a licence to own a nuclear power plant is responsible for adopting whatever measures are needed for safe management and disposal of spent nuclear fuel and radioactive waste deriving from it and for decommissioning and dismantling of the reactor plants after they have been taken out of service. The most important measures are to plan, build and operate the facilities and systems that are needed for this, and to conduct related research and development. The financing of these measures is based on payment of fees to a fund by the licensees, primarily during the period the reactors are in operation, but also later if need be. The details of this financing are regulated in the so called Financing Act (2006:647) with associated Ordinance (2008:715)1. SKB has the task of calculating and compiling the future costs for the four licensees. The future costs are based on SKB's current planning regarding the design of the system and the timetable for its execution. The current design is called the reference design, while the planning around it is called the reference scenario. This report is based on the proposed plan of the activities that has been presented in SKB's RDandD Programme 2007 and the most recent activity plan. The quantity of spent nuclear fuel to be managed in this scenario is based on an operating time of 50 years for each of the Forsmark and Ringhals reactors and 60 years for the Oskarshamn reactors, rounded off to fuel equivalent to 6,000 copper canisters. Preparations are currently being made by SKB for selection of the site for the final repository for nuclear fuel. The goal is that one of the two sites where the site investigations (now almost completed) have been carried out will be chosen. The cost calculations are based on the assumption of Forsmark as the site in the reference scenario. This choice has been for optimal illumination of different cost aspects and must not be regarded as a commitment on the part of SKB. The

  8. WASP in Nuclear Power Planning

    International Nuclear Information System (INIS)

    Cao Chi; Vuong Minh Quang; Nguyen Tri Ho

    1993-03-01

    The main modules of WASP are presented in details in the introduction paragraph. The authors have emphasized on the probabilistic simulation used in WASP for evaluating different costs of the objective function and the Bellman principle for finding the optimal trajectory in dynamic programming. In the second paragraph the principal results obtained by the Nuclear Power Dept. of VINATOM are enumerated: a/the most cost-effective solution for Vietnam is to introduce a nuclear power capacity of 800-1200 MW by around the year 2010; b/ different types of reactors for the first NPP are ranked according to their economic criteria; c/ the sensitivity analysis is also carried out with respect to discount rates, LOLP (loss of load probability), ENS (energy non served), construction cost. (author). 4 figs, 7 tabs

  9. Nuclear power production costs

    International Nuclear Information System (INIS)

    Erramuspe, H.J.

    1988-01-01

    The economic competitiveness of nuclear power in different highly developed countries is shown, by reviewing various international studies made on the subject. Generation costs (historical values) of Atucha I and Embalse Nuclear Power Plants, which are of the type used in those countries, are also included. The results of an international study on the economic aspects of the back end of the nuclear fuel cycle are also reviewed. This study shows its relatively low incidence in the generation costs. The conclusion is that if in Argentina the same principles of economic racionality were followed, nuclear energy would be economically competitive in the future, as it is today. This is of great importance in view of its almost unavoidable character of alternative source of energy, and specially since we have to expect an important growth in the consumption of electricity, due to its low share in the total consumption of energy, and the low energy consumption per capita in Argentina. (Author) [es

  10. Nuclear power planning study for Saudi Arabia

    International Nuclear Information System (INIS)

    Kutbi, I.I.; Matin, Abdul.

    1984-05-01

    The prospects of application of nuclear energy for production of electricity and desalinated water in the Kingdom are evaluated. General economic development of the country and data on reserves, production and consumption of oil and natural gas are reviewed. Electrical power system is described with data on production and consumption. Estimates of future power demand are made using Aoki method. Costs of production of electricity from 600 MW, 900 MW and 1200 MW nuclear and oil-fired power plants are calculated along with the costs of production of desalinated water from dual purpose nuclear and oil-fired plants. The economic analysis indicates that the cost of production of electricity and desalinated water are in general cheaper from the nuclear power plants. Suggests consideration of the use of nuclear energy for production of both electricity and desalinated water from 1415 H. Further detailed studies and prepartory organizational steps in this direction are outlined. 38 Ref

  11. Power production at minimum risk

    International Nuclear Information System (INIS)

    Fremlin, J.H.

    1983-01-01

    A summary, including extensive quotations, is given of the main themes of a lecture by Prof. Fremlin in which he assessed the risks inherent in the use of various power systems. Considering only hazards which affect members of the public, the methods used to quantify such risks are examined. Both so-called inconspicuous hazards from radiation effects and conspicuous risks from accidents which could arise from nuclear power stations are compared to those from other types of power generation. The small risk arising from nuclear wastes is stressed. The lecturer concluded that he would not let 'tiny differences of risk' affect his decisions on energy planning. (U.K.)

  12. Mechanisms of power in participatory rural planning

    DEFF Research Database (Denmark)

    Johansen, Pia Heike; Chandler, Thomas Lund

    2015-01-01

    that in such an assessment of power it is needed also to drawn in the social context because different social contexts will be more or less vulnerable to different mechanisms of power. The paper takes the stand the rural settings are especially vulnerable to dis-engagement of local citizens, sub-ordination of the rural...... by the urban privilege to define the rural qualities and creation of local conflicts and that mechanisms of power that cause such unintended outcomes of rural planning projects should be uncovered. Inspired by Foucault's interpretation of power the paper carries out a grounded theory inspired analysis...

  13. Nuclear power planning and feasibility studies

    International Nuclear Information System (INIS)

    Streeton, D.F.

    1977-01-01

    This lecture will review the basic steps associated with planning the introduction of nuclear power. Areas covered will include power market surveys, energy resources evaluations, potential alternative strategies, organisational factors and implementational requirements. The lecture will then consider the implications and requirements associated with establishing the feasibility of a nuclear project. Among others, aspects of power systems integration, site selection reactor type evaluation, cost and economic analysis, influence of contracting strategies, comparison with alternative power generation solutions, financial impact, etc. will be discussed and reviewed. (HK) [de

  14. Hierarchical production planning for consumer goods

    NARCIS (Netherlands)

    Kok, de A.G.

    1990-01-01

    Abstract In this paper the mathematical logic behind a hierarchical planning procedure is discussed. The planning procedure is used to derive production volumes of consumer products. The essence of the planning procedure is that first a commitment is made concerning the production volume for a

  15. Energy and nuclear power planning studies

    International Nuclear Information System (INIS)

    Bennett, L.L.; Molina, P.E.; Mueller, T.

    1990-01-01

    The article focuses on the procedures established by the IAEA for providing assistance to international Member States in conducting studies for the analysis of the economic viability of a nuclear power programme. This article specifically reviews energy and nuclear power planning (ENPP) studies in Algeria, Jordan, and Thailand. It highlights major accomplishments in the context of study objectives and organizations, and the principal lessons learned in the process. 4 figs, 1 tab

  16. Missions and planning for nuclear space power

    International Nuclear Information System (INIS)

    Buden, D.

    1979-01-01

    Requirements for electrical and propulsion power for space are expected to increase dramatically in the 1980s. Nuclear power is probably the only source for some deep space missions and a major competitor for many orbital missions, especially those at geosynchronous orbit. Because of the potential requirements, a technology program on reactor components has been initiated by the Department of Energy. The missions that are foreseen, the current reactor concept, and the technology program plan are described

  17. Power facility plan and power supply plan of Japan in 1988

    Energy Technology Data Exchange (ETDEWEB)

    Yoshino, Shoji; Makino, Masao

    1988-06-01

    The power facility plan and the power supply plan for 1988 are described. The demand by non-industrial use will grow at an average of 3.8% for the 1986-97 period due to changes in the life style, construction and extension of buildings and increasing use of OA equipment although the power conservation is promoted. The industrial consumption will increase at only 1.2% a year due to the slowed growth and energy saving. As a result, the total demand will be 778,200 million kWh in 1997 with annual growth of 2.4%. The maximum demand will be 151,210 kW in 1997 with annual growth of 2.9%. The annual load rate will decrease to 56.9%, showing a continuously worsening utilization efficiency of power facilities. The development of 29 power units with total capacity of 2,760 MW is planned in 1988 for a stable power supply with a sufficient margin regarding maximum demand. The plan requires the investment of 3,700 billion yen, including the power transmission systems and substations. The power supply plan in 1988 is aimed at the effective operation of facilities and cost reduction by regional management under proper recognition of local characteristics of each power source, while maintaining a stable power supply with specified margins. (1 fig, 11 tabs)

  18. Efficient energy utilization and environmental issues applied to power planning

    International Nuclear Information System (INIS)

    Campbell, Hector; Montero, Gisela; Perez, Carlos; Lambert, Alejandro

    2011-01-01

    This document shows the importance of policies for electric energy savings and efficient energy utilization in power planning. The contributions of economic, social, and environmental items were evaluated according to their financial effects in the delay of investments, reduction of production costs and decrement of environmental emissions. The case study is Baja California, Mexico; this system has a unique primary source: geothermal energy. Whether analyzing the planning as usual or planning from the supply side, the forecast for 2005-2025 indicates that 4500 MW additional installed capacity will be required (3-times current capacity), representing an investment that will emit 12.7 Mton per year of CO 2 to the atmosphere and will cost US$2.8 billion. Systemic planning that incorporates polices of energy savings and efficiency allows the reduction of investments and pollutant emissions. For example, a reduction of 20% in the growth trend of the electricity consumption in the industrial customers would save US$10.4 billion over the next 20 years, with a potential reduction of 1.6 Mton/year of CO 2 . The increase in geothermal power generation is also attractive, and it can be combined with the reduction of use and energy losses of utilities, which would save US$13.5 billion and prevent the discharge of 8.5 Mton/year of CO 2 . - Highlights: → We contrast power planning methods for supply electricity for economy development. → Importance of policies for electricity savings and efficient use in power planning. → Systemic planning facilitates decision-making process for electricity optimization. → Supply-side planning will cause climb in prices and loss of energy self-sufficiency. → Power planning should be immersed in an environment of appropriate energy policies.

  19. Fujian electric system analysis and nuclear power planning

    International Nuclear Information System (INIS)

    Lin Jianwen; Fu Qiang; Cheng Ping

    1994-11-01

    The objective of the study is to conduct a long term electric expansion planning and nuclear power planning for Fujian Province. The Wien Automatic System Planning Package (WASP-III) is used to optimize the electric system. Probabilistic Simulation is one of the most favorite techniques for middle and long term generation and production cost planning of electric power system. The load duration curve is obtained by recording the load data of a time interval into a monotone non-increasing sense. Polynomial function is used to describe the load duration curve (LDC), and this LDC is prepared for probabilistic simulation in WASP-III. WASP-III is a dynamic optimizing module in the area of supply modelling. It could find out the economically optimal expansion plan for a power generating system over a period of up to thirty years, with the constraints given by the planners. The optimum is evaluated in terms of minimum discounted total costs. Generating costs, amount of energy not served and reliability of the system are analyzed in the system expansion planning by using the probabilistic simulation method. The following conclusions can be drawn from this study. Hydro electricity is the cheapest one of all available technologies and resources. After the large hydro station is committed at the end of 1995, more base load power plants are needed in the system. Coal-fired power plants with capacity of 600 MWe will be the most competitive power plants in the future of the system. At the end of the studying period, about half of the stalled capacity will be composed of these power plants. Nuclear power plants with capacity of 600 MWe are suitable for the system after the base load increases to a certain level. Oil combustion units will decrease the costs of the system. (12 tabs., 6 figs.)

  20. Planning product quality: An example - ornamental plants

    Directory of Open Access Journals (Sweden)

    Kovačević Miodrag

    2003-01-01

    Full Text Available The industry of ornamental plants is a subject of quality planning. The quality plan is a document setting out the specific quality practices in ornamental plants production. That plan introduce organizational structure procedures, processes and resources needed to implement quality in life cycle of product chain. For engineers it represents a new tool.

  1. Combination of AC Transmission Expansion Planning and Reactive Power Planning in the restructured power system

    International Nuclear Information System (INIS)

    Hooshmand, Rahmat-Allah; Hemmati, Reza; Parastegari, Moein

    2012-01-01

    Highlights: ► To overcome the disadvantages of DC model in Transmission Expansion Planning, AC model should be used. ► The Transmission Expansion Planning associated with Reactive Power Planning results in fewer new transmission lines. ► Electricity market concepts should be considered in Transmission Expansion Planning problem. ► Reliability aspects should be considered in Transmission Expansion Planning problem. ► Particle Swarm Optimization is a suitable optimization method to solve Transmission Expansion Planning problem. - Abstract: Transmission Expansion Planning (TEP) is an important issue in power system studies. It involves decisions on location and number of new transmission lines. Before deregulation of the power system, the goal of TEP problem was investment cost minimization. But in the restructured power system, nodal prices, congestion management, congestion surplus and so on, have been considered too. In this paper, an AC model of TEP problem (AC-TEP) associated with Reactive Power Planning (RPP) is presented. The goals of the proposed planning problem are to minimize investment cost and maximize social benefit at the same time. In the proposed planning problem, in order to improve the reliability of the system the Expected Energy Not Supplied (EENS) index of the system is limited by a constraint. For this purpose, Monte Carlo simulation method is used to determine the EENS. Particle Swarm Optimization (PSO) method is used to solve the proposed planning problem which is a nonlinear mixed integer optimization problem. Simulation results on Garver and RTS systems verify the effectiveness of the proposed planning problem for reduction of the total investment cost, EENS index and also increasing social welfare of the system.

  2. AVLIS production plant waste management plan

    International Nuclear Information System (INIS)

    1984-01-01

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables

  3. Appendix E - Sample Production Facility Plan

    Science.gov (United States)

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix E is intended to provide examples and illustrations of how a production facility could address a variety of scenarios in its SPCC Plan.

  4. Workforce Planning for New Nuclear Power Programmes

    International Nuclear Information System (INIS)

    2011-01-01

    An appropriate infrastructure is essential for the efficient, safe, reliable and sustainable use of nuclear power. The IAEA continues to be encouraged by its Member States to provide assistance to those considering the introduction of nuclear power. Its response has been to increase technical assistance, organize more missions and hold workshops, as well as to issue new and updated publications in the IAEA Nuclear Energy Series. Milestones in the Development of a National Infrastructure for Nuclear Power, an IAEA Nuclear Energy Series publication (NG-G-3.1), provides detailed guidance on a holistic approach to national nuclear infrastructure development involving three phases. Nineteen issues are identified in this guide, ranging from development of a government's national position on nuclear power to planning for procurement related to the first nuclear power plant. One of these 19 issues upon which each of the other 18 depend is suitable human resources development. As a growing number of Member States begin to consider the nuclear power option, they ask for guidance from the IAEA on how to develop the human resources necessary to launch a nuclear power programme. The nuclear power field, comprising industry, government authorities, regulators, R and D organizations and educational institutions, relies on a specialized, highly trained and motivated workforce for its sustainability and continued success, quite possibly more than any other industrial field. This report has been prepared to provide information on the use of integrated workforce planning as a tool to effectively develop these resources for the spectrum of organizations that have a stake in such nuclear power programmes. These include, during the initial stages, a nuclear energy programme implementing organization (NEPIO), as well as the future operating organization, nuclear regulatory body, government authorities and technical support organizations if a decision is made to initiate a nuclear power

  5. Planning of a Quadgeneration power plant for Jammerbugt energy system

    DEFF Research Database (Denmark)

    Rudra, Souman; Hoffmann, Jessica; Rosendahl, Lasse

    2011-01-01

    Quadgeneration is the simultaneous production of power, heat and cooling and different fuels from flexible feedstocks such as biomass, waste, refinery residue etc. In order to accommodate more renewable energy into the energy system, it is extremely necessary to develop new flexible power plants...... of some equipments in the Quadgeneration power plant. This paper presents two models for the investment planning of a Quadgeneration energy system in Jammerbugt municipality, and uses these models for different case studies addressing the system for production of heat, cooling, liquid fuels...... that can quickly increase or decrease the production of electricity. Such plants should be ultra flexible in terms of production and able to run on many different types of fuels, with one of its major outputs being liquid fuels for the transport sector. The aim of this paper is to integrate district...

  6. Power system restoration: planning and simulation

    Energy Technology Data Exchange (ETDEWEB)

    Hazarika, D. [Assam Engineering Coll., Dept. of Electrical Engineering, Assam (India); Sinha, A.K. [Inidan Inst. of Technology, Dept. of Electrical Engineering, Kharagpur (India)

    2003-03-01

    This paper describes a restoration guidance simulator, which allows power system operator/planner to simulate and plan restoration events in an interactive mode. The simulator provides a list of restoration events according to the priority based on some restoration rules and list of priority loads. It also provides in an interactive mode the list of events, which becomes possible as the system grows during restoration. Further, the selected event is validated through a load flow and other analytical tools to show the consequences of implementing the planned event. (Author)

  7. Dynamic Domains in Data Production Planning

    Science.gov (United States)

    Golden, Keith; Pang, Wanlin

    2005-01-01

    This paper discusses a planner-based approach to automating data production tasks, such as producing fire forecasts from satellite imagery and weather station data. Since the set of available data products is large, dynamic and mostly unknown, planning techniques developed for closed worlds are unsuitable. We discuss a number of techniques we have developed to cope with data production domains, including a novel constraint propagation algorithm based on planning graphs and a constraint-based approach to interleaved planning, sensing and execution.

  8. Statistical modeling to support power system planning

    Science.gov (United States)

    Staid, Andrea

    This dissertation focuses on data-analytic approaches that improve our understanding of power system applications to promote better decision-making. It tackles issues of risk analysis, uncertainty management, resource estimation, and the impacts of climate change. Tools of data mining and statistical modeling are used to bring new insight to a variety of complex problems facing today's power system. The overarching goal of this research is to improve the understanding of the power system risk environment for improved operation, investment, and planning decisions. The first chapter introduces some challenges faced in planning for a sustainable power system. Chapter 2 analyzes the driving factors behind the disparity in wind energy investments among states with a goal of determining the impact that state-level policies have on incentivizing wind energy. Findings show that policy differences do not explain the disparities; physical and geographical factors are more important. Chapter 3 extends conventional wind forecasting to a risk-based focus of predicting maximum wind speeds, which are dangerous for offshore operations. Statistical models are presented that issue probabilistic predictions for the highest wind speed expected in a three-hour interval. These models achieve a high degree of accuracy and their use can improve safety and reliability in practice. Chapter 4 examines the challenges of wind power estimation for onshore wind farms. Several methods for wind power resource assessment are compared, and the weaknesses of the Jensen model are demonstrated. For two onshore farms, statistical models outperform other methods, even when very little information is known about the wind farm. Lastly, chapter 5 focuses on the power system more broadly in the context of the risks expected from tropical cyclones in a changing climate. Risks to U.S. power system infrastructure are simulated under different scenarios of tropical cyclone behavior that may result from climate

  9. Sustainable Multi-Product Seafood Production Planning Under Uncertainty

    International Nuclear Information System (INIS)

    Simanjuntak, Ruth; Mawengkang, Herman; Sembiring, Monalisa; Sinaga, Rani; Pakpahan, Endang J

    2013-01-01

    A multi-product fish production planning produces simultaneously multi fish products from several classes of raw resources. The goal in sustainable production planning is to meet customer demand over a fixed time horizon divided into planning periods by optimizing the tradeoff between economic objectives such as production cost, waste processed cost, and customer satisfaction level. The major decisions are production and inventory levels for each product and the number of workforce in each planning period. In this paper we consider the management of small scale traditional business at North Sumatera Province which performs processing fish into several local seafood products. The inherent uncertainty of data (e.g. demand, fish availability), together with the sequential evolution of data over time leads the sustainable production planning problem to a nonlinear mixed-integer stochastic programming model. We use scenario generation based approach and feasible neighborhood search for solving the model.

  10. Short-Term Planning of Hybrid Power System

    Science.gov (United States)

    Knežević, Goran; Baus, Zoran; Nikolovski, Srete

    2016-07-01

    In this paper short-term planning algorithm for hybrid power system consist of different types of cascade hydropower plants (run-of-the river, pumped storage, conventional), thermal power plants (coal-fired power plants, combined cycle gas-fired power plants) and wind farms is presented. The optimization process provides a joint bid of the hybrid system, and thus making the operation schedule of hydro and thermal power plants, the operation condition of pumped-storage hydropower plants with the aim of maximizing profits on day ahead market, according to expected hourly electricity prices, the expected local water inflow in certain hydropower plants, and the expected production of electrical energy from the wind farm, taking into account previously contracted bilateral agreement for electricity generation. Optimization process is formulated as hourly-discretized mixed integer linear optimization problem. Optimization model is applied on the case study in order to show general features of the developed model.

  11. New production of electric power when accelerating nuclear power phaseout

    International Nuclear Information System (INIS)

    1986-10-01

    This investigation states that it is possible to eliminate nuclear power to the beginning of the year 2000. In this case the time for planning and construction of large coal power plants with condenser turbines should be set at seven years. The production cost excluding fuel will be 0.12 to 0.19 SEK per kWh. Investment cost is estimated to 5 500 to 8 200 SEK per kW. When using wood chips the cost will be 0.30 SEK and 11 300 SEK, respectively. A large part of the increased cost will include substantial flue gas purification. The existing plant of Karlshamn should be maintained with a minimum of charges and extensions

  12. Coal Power Systems strategic multi-year program plans; TOPICAL

    International Nuclear Information System (INIS)

    None

    2001-01-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL)

  13. Nuclear power in Asia: Experience and plans

    International Nuclear Information System (INIS)

    Lee Chang Kun

    1999-01-01

    Asian countries have developed ambitious energy supply programs to expand their energy supply systems to meet the growing needs of their rapidly expanding economies. Most of their new electrical generation needs will be met by coal, oil and gas. However, the consideration of growing energy demand, energy security, environmental conservation, and technology enhancement is inducing more Asian countries toward the pursuit of nuclear power development. At present, nuclear power provides about 30% of electricity in Japan, and about 40% of electricity in Korea. These and other Asian countries are presumed to significantly increase their nuclear power generation capacities in coming years. Korea's nuclear power generation facilities are projected to grow from 12 gigawatt in 1998 to 16.7 gigawatt by 2004. On the other hand, China and India have now installed nuclear capacities of about 2 gigawatt, respectively, which will increase by a factor of two or more by 2004. The installed nuclear capacity in the Asian region totalled 67 gigawatt as of the end of 1997, representing about sixteen percent of the world capacity of 369 gigawatt. Looking to the year 2010, it is anticipated that most of the world's increase in nuclear capacity will come from Asia. It is further forecasted that Asian nations will continue to expand their nuclear capacity as they move into the 21st century. For example, China plans to develop additional 18 gigawatt of nuclear power plants by the year 2010. Nuclear power is also of particular interest to a number of emerging Asian countries in view of environmental conservation and mitigation of greenhouse gas emissions in particular. Nuclear power appeals to some countries because of its high technology content. The strength in an advanced technology, such as the technological capability related to nuclear power, contributes to the overall development of the corresponding country's engineering base, enhancement of industrial infrastructure and expansion of

  14. Maintenance planning for nuclear power plants

    International Nuclear Information System (INIS)

    Mattu, R.K.; Cooper, S.E.; Lauderdale, J.R.

    2004-01-01

    Maintenance planning for nuclear power plants is similar to that in other industrial plants but it is heavily influenced by regulatory rules, with consequent costs of compliance. Steps by the nuclear industry and the Nuclear Regulatory Commission to address that problem include development of guidelines for maintenance of risk-critical equipment, using PRA-based techniques to select a set of equipment that requires maintenance and reliability-centered maintenance (RCM) approaches for determining what maintenance is required. The result of the process is a program designed to ensure effective maintenance of the equipment most critical to plant safety. (author)

  15. Case study of nuclear power planning

    International Nuclear Information System (INIS)

    Covarrubias, A.J.; Lane, J.A.

    1976-01-01

    An improved version of the computer programme WASP (Wien Automatic System Planning) is described by the example of a case study. The aim of an optimal power plant development within the economic development is reached over several steps the most important parameters of which are explained in detail. To use the method it is necessary to know and to describe the energy and electricity supply situation of the country referred to. The programme development described has proved to be good in use in an international frame. The IAEA offers its help to all prospected customers in their initial period with the programme WASP. (UA) [de

  16. CEGB nuclear power stations basic emergency plan

    International Nuclear Information System (INIS)

    1978-03-01

    The introduction states that this is a typical emergency plan for a nuclear power station employing about 500 people, having two reactors and a total electrical output of 500 Megawatts in an intensively farmed rural area. The document has the following headings: definitions ('site incident', etc); functions of the site emergency organization; conditions for taking emergency action; persons empowered to declare or cancel a site incident or an emergency; emergency actions by staff; control centres; communication; collaboration with other bodies; warnings; transport; house rules; public information centre. (U.K.)

  17. Flexible power generation systems and their planning

    International Nuclear Information System (INIS)

    Schwarzenbach, A.; Wunsch, A.K.

    1989-01-01

    By determining their specific annual costs and expressing them in relation to the period of utilization or to the load factor, it is possible to compare the relative merits of different combinbations of power generation systems. This method, with which unsuitable planning variants can be eliminated without having to go through long, intricate calculations and without taking up costly computer time, has the advantage that it points up the origin of the costs and at the same time makes clear how improvement can be achieved by combining base-load, medium-load and peak-load plants. The different types of power plant (hydro-electric, nuclear, steam, gas-turbine, combined cycle, cogeneration and coal gasification) are characterized by their approximate specific capital investment, construction period, efficiency, fuel, duty, and time from cold start to full load. They are compared by plotting their total specific annual costs in SFr/kWa against the load factor. The special benefits which combined cycle plants, with gas turbines, heat-recovery boilers and steam plant, can offer today (not only high fuel utilization and relatively low first-time costs, but also the short time needed for planning and construction) are underlined. 5 refs.; 9 figs.; 3 tabs

  18. Air quality analysis for the Western Area Power Administration's 2004 Power Marketing Plan Environmental Impact Statement

    International Nuclear Information System (INIS)

    Glantz, C.S.; Dagle, J.E.; Bilyard, G.R.

    1997-01-01

    The Western Area Power Administration (Western) markets and transmits electric power throughout 15 western states. Western's Sierra Nevada Customer Service Region (Sierra Nevada Region) markets approximately 1,480 megawatts (MW) of firm power (plus 100 MW of seasonal peaking capacity) from the Central Valley Project (CVP) and other resources. Western's mission is to sell and deliver electricity generated from these resources. Western's capacity and energy sales must be in conformance with the laws that govern its sale of electrical power. Further, Western's hydropower operations at each facility must comply with minimum and maximum flows and other constraints set by other regulatory agencies. The Sierra Nevada Region proposes to develop a marketing plan that defines the products and services it would offer beyond the year 2004 and the eligibility and allocation criteria for its electric power resources. Because determining levels of long-term firm power resources to be marketed and subsequently entering into contracts for the delivery of related products and services could be a major Federal action with potentially significant impacts to the human environment, the 2004 Power Marketing Plan Environmental Impact Statement (2004 EIS) is being prepared. Decisions made by the Sierra Nevada Region on how and when to supply power to its customers would influence the operation of power plants within the Western Systems Coordinating Council (WSCC). If the resources affected are thermal resources, this could in turn affect the amount, timing, and location of pollutant emissions to the air at locations throughout the western United States. This report has been produced in conjunction with the 2004 EIS to provide a more detailed discussion of the air quality implications of the 2004 power marketing plan

  19. Nuclear power plant Severe Accident Research Plan

    International Nuclear Information System (INIS)

    Larkins, J.T.; Cunningham, M.A.

    1983-01-01

    The Severe Accident Research Plan (SARP) will provide technical information necessary to support regulatory decisions in the severe accident area for existing or planned nuclear power plants, and covers research for the time period of January 1982 through January 1986. SARP will develop generic bases to determine how safe the plants are and where and how their level of safety ought to be improved. The analysis to address these issues will be performed using improved probabilistic risk assessment methodology, as benchmarked to more exact data and analysis. There are thirteen program elements in the plan and the work is phased in two parts, with the first phase being completed in early 1984, at which time an assessment will be made whether or not any major changes will be recommended to the Commission for operating plants to handle severe accidents. Additionally at this time, all of the thirteen program elements in Chapter 5 will be reviewed and assessed in terms of how much additional work is necessary and where major impacts in probabilistic risk assessment might be achieved. Confirmatory research will be carried out in phase II to provide additional assurance on the appropriateness of phase I decisions. Most of this work will be concluded by early 1986

  20. EHV AC undergrounding electrical power performance and planning

    CERN Document Server

    Benato, Roberto

    2014-01-01

    Analytical methods of cable performance in EHV AC electrical power are discussed in this comprehensive reference. Descriptions of energization, power quality, cable safety constraints and more, guide readers in cable planning and power network operations.

  1. Energy and nuclear power planning study for Algeria

    International Nuclear Information System (INIS)

    1985-01-01

    This study, conducted jointly by a team of engineers and economists from the Sonelgaz company and the IAEA, had three objectives: (1) To perform a preliminary economic study aimed at initiating thinking on the role that nuclear power could play in Algeria's long-term energy structure and to suggest reasonable hypotheses on what share of the energy market nuclear power might supply. (2) To train a team of Algerian engineers and economists in long-term economic planning techniques. Once the team has gained a basic knowledge through this preliminary study, it will be in a position to continue the process, to perform other, more detailed independent analyses and to review the entire process should economic conditions change. (3) To introduce in Algeria the computer techniques and facilities needed to carry out such energy investment planning studies for electricity production. The main aim throughout the studies was to train a team of Algerian engineers in energy planning rather than to come to definitive conclusions on the problem of introducing nuclear power in Algeria. Two successive analyses were performed. The first consisted in evaluating the final energy requirements which will result in the medium and long term (by 2015) from the implementation of the economic development policies in the Five Year Plan (up to 1984) and in the proposals for the next decade (up to 1990) being studied by the Algerian Ministry of Planning. The second part is concerned only with the results regarding future electricity requirements, which are used as input data in studying the optimization of Algeria's future electricity generating system. Various methods of generation are analysed and included in an econometric model in order to make a sequential determination of the most economic composition of power generating capacity

  2. Improving acceptance in wind power planning

    Energy Technology Data Exchange (ETDEWEB)

    Hammarlund, K. [Lund Univ. (Sweden). Dept. of Social and Economic Geography

    1996-12-01

    This paper presents important factors and planning procedures for public acceptance of wind power. Opinion surveys in Sweden show that acceptance is connected to the concept of utility rather than the aesthetic values. If wind turbines are confined by the authorities to marginal areas, they will not earn their rightful place in the landscape by being of use. A positive attitude in general promotes a positive experience of the effects of wind turbines. It is therefore essential to establish a sense of cooperation between the project management and the public. An open dialogue and continuous information will increase the possibilities for acceptance of future development. We must establish new codes of practice in permit processing because policies today contains ideological and practical contradictions between development and preservation of landscapes. 16 refs, 2 tabs

  3. Supply disruption cost for power network planning

    International Nuclear Information System (INIS)

    Kjoelle, G.H.

    1992-09-01

    A description is given of the method of approach to calculate the total annual socio-economic cost of power supply disruption and non-supplied energy, included the utilities' cost for planning. The total socio-economic supply disruption cost is the sum of the customers' disruption cost and the utilities' cost for failure and disruption. The mean weighted disruption cost for Norway for one hour disruption is NOK 19 per kWh. The customers' annual disruption cost is calculated with basis in the specific disruption cost referred to heavy load (January) and dimensioning maximum loads. The loads are reduced by factors taking into account the time variations of the failure frequency, duration, the loads and the disruption cost. 6 refs

  4. Improving acceptance in wind power planning

    International Nuclear Information System (INIS)

    Hammarlund, K.

    1996-01-01

    This paper presents important factors and planning procedures for public acceptance of wind power. Opinion surveys in Sweden show that acceptance is connected to the concept of utility rather than the aesthetic values. If wind turbines are confined by the authorities to marginal areas they will not earn their rightful place in the landscape by being of use. A positive attitude in general promotes positive experience of the effects of wind turbines. It is therefore essential to establish a sense of cooperation between the project management and the public. An open dialogue and continuous information will increase the possibilities for acceptance of future development. We must establish new codes of practice in permit processing because policies today contains idealogical and practical contradictions between the development and preservation of landscapes. (author)

  5. Geostatistics applied in mine production planning

    Energy Technology Data Exchange (ETDEWEB)

    Zerdin, F.; Markic, S.; Subelj, A. [NTF, Ljubljana (Slovenia)

    1998-07-01

    Long-term plan for lignite mine Velenje has been made by using a technical 'parametrisation' method where the basis for periodic, middle-term and short-term plans as well as for scheduling has already been fixed. Plans are presented by grade (heating value in GJ), quantity of ROM coal in tons and quantity of excavated material in cubic metre for each sequence of the seam or whole seam as well as for all working seams in the mines as a whole which correspond to a defined time period. Grade planning aims at achieving uniform product quality to meet contractual obligations. 17 refs., 10 figs.

  6. Nuclear power plant thermal-hydraulic performance research program plan

    International Nuclear Information System (INIS)

    1988-07-01

    The purpose of this program plan is to present a more detailed description of the thermal-hydraulic research program than that provided in the NRC Five-Year Plan so that the research plan and objectives can be better understood and evaluated by the offices concerned. The plan is prepared by the Office of Nuclear Regulatory Research (RES) with input from the Office of Nuclear Reactor Regulation (NRR) and updated periodically. The plan covers the research sponsored by the Reactor and Plant Systems Branch and defines the major issues (related to thermal-hydraulic behavior in nuclear power plants) the NRC is seeking to resolve and provides plans for their resolution; relates the proposed research to these issues; defines the products needed to resolve these issues; provides a context that shows both the historical perspective and the relationship of individual projects to the overall objectives; and defines major interfaces with other disciplines (e.g., structural, risk, human factors, accident management, severe accident) needed for total resolution of some issues. This plan addresses the types of thermal-hydraulic transients that are normally considered in the regulatory process of licensing the current generation of light water reactors. This process is influenced by the regulatory requirements imposed by NRC and the consequent need for technical information that is supplied by RES through its contractors. Thus, most contractor programmatic work is administered by RES. Regulatory requirements involve the normal review of industry analyses of design basis accidents, as well as the understanding of abnormal occurrences in operating reactors. Since such transients often involve complex thermal-hydraulic interactions, a well-planned thermal-hydraulic research plan is needed

  7. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  8. Phonological Advance Planning in Sentence Production

    Science.gov (United States)

    Oppermann, Frank; Jescheniak, Jorg D.; Schriefers, Herbert

    2010-01-01

    Our study addresses the scope of phonological advance planning during sentence production using a novel experimental procedure. The production of German sentences in various syntactic formats (SVO, SOV, and VSO) was cued by presenting pictures of the agents of previously memorized agent-action-patient scenes. To tap the phonological activation of…

  9. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  10. Study of the proper contribution of independent power producing business in the long-range power supply and demand plan

    Energy Technology Data Exchange (ETDEWEB)

    Jo, S.B. [Korea Energy Economics Institute, Euiwang (Korea, Republic of)

    1997-12-01

    The independent power producing business has expanded its size and process through the Long-range Power Supply and Demand Plan of 1993, 1995, and it is high time that full-scale competition in the power generation market began to emerge. This report assesses the marginal costs of independent and general power producing businesses on a theoretical basis on the proper size of independent power producing business, and presents the methods to compare these. But, since there follows several problems in applying this theoretical model, a practical standard to decide the proper level of independent power production amount is presented. That is, while not much burdening the existing industrial structure, I search for ways to present the amount of independent power production and the methods of power generation to make sure that the competition effect is maximized when full-scale competition started. However, in the long-term, the allotment of independent power production itself could be a violation to the basic spirit of competition. A more desirable way is to allow independent power producers and the Korea Power Corp. to freely compete on all types of power generation and facilities. The supply plan should be also operated smoothly and flexibly since the types of power generation and the amounts reflect the result of competition not the predetermined ones. Therefore, a long-range power supply and demand plan should be converted from a planning-oriented concept to a market-oriented base with the structural overhaul of the power generation industry for the effective resources distribution of power supply facilities. 18 refs., 2 figs., 7 tabs.

  11. Planning and development of the Spanish nuclear power programme

    International Nuclear Information System (INIS)

    Lopez-Rodriguez, M.

    1983-01-01

    The paper analyses the Spanish nuclear power programme from its inception to the present time, doing so within the context of the country, characterized by the fairly rapid change from a basically agricultural economy to an economy in which industry and services play an important part and the transformation of which took place mainly during the decade prior to the energy crisis 1973. Reference is made to the early establishment of the Junta de Energia Nuclear (Nuclear Energy Board) (JEN), which was set up as a research body even before nuclear energy became competitive with other sources for the production of electric power and which, by adapting its structure and programmes to the different phases in the development and utilization of nuclear energy in the country, contributed the necessary scientific, technical and legal infrastructure. There is also an analysis of the most striking features of the Spanish energy system and an account of the planning and construction of the first three Spanish nuclear power stations. A further subject of discussion is the energy planning and development projects devised by the Government which gave rise to the second generation of nuclear power plants, some of which are already in operation and the remainder in an advanced state of construction. Emphasis is placed on the action taken by the Spanish Government to increase the participation of Spanish industry in the construction of nuclear power plants and in the supply of equipment and services required for their operation. Reference is made to the experimental changes which have been made in the institutional infrastructure in order to adapt it to the phase of development which has been reached and to the objectives subsequently laid down in the planning: establishment of ENUSA (the national uranium enterprise), the Equipos Nucleares corporation and the Nuclear Safety Council, and also the changes made in the JEN

  12. Outline of electric power installation plan for fiscal 1981

    International Nuclear Information System (INIS)

    Murakami, Masami

    1981-01-01

    The electric power installation plan for fiscal 1981 was submitted by power companies to the Minister of International Trade and Industry at the end of March. In 1990, the total demand of electric power will be 907.9 billion kWh, and the yearly rate of growth will be about 5%. The peak demand of electric power continues to be acute, and is expected to be 175.74 million kW. In order to supply power so as to always balance the demand, the reserve power of 8 to 10% of the maximum demand is required. According to the submitted plan, the power sources determined already are not sufficient, therefore it was planned to present 61 plants of 11.94 million kW in 1981 and 64 plants of 19.61 million kW in 1982 to the Power Source Development Coordination Council. If the power source development progresses as planned, the adequate rate to reserve is maintained up to 1990, and the stable supply of electric power seems to be secured. However when some delay occurs in the plan, serious obstacle to the demand and supply may arise. This plan fundamentally follows the policy to deversify power sources toward the target of substitute energy supply for petroleum. The power transmission facilities are also strengthened and expanded. The investment plan for fiscal 1981 is shown. (Kako, I.)

  13. Outline of electric power facility plan in fiscal year 1988

    International Nuclear Information System (INIS)

    1988-01-01

    As to the electric power facility plan in fiscal year 1988, 15 designated electric power enterprises made the notification to the Minister of International Trade and Industry in March, 1988. This outline of the facility plan summarized the plans of 66 enterprises in total, including the plans of municipally operated, joint thermal power and other enterprises in addition to the above 15. In order to ensure the stable supply of electric power, the Ministry of International Trade and Industry considers that it is indispensable to purposefully develop electric power sources and the facilities for distribution along this facility plan. The forecast for fiscal year 1997 is : total electric power demand 778.2 billion kWh, maximum power demand 151.21 million kW, and yearly load factor 56.9 %. This is equivalent to the yearly growth of 2.4 %. In fiscal year 1988, it is planned to present 29 plants of 2760 MW to the Power Source Development Coordination Council. The breakdown is : hydroelectricity 140 MW, thermal power 2010 MW, and nuclear power 610 MW. The Ministry guides electric power enterprises so as to realize the diversification of electric power sources. Also the increase of transmission and transformation facilities, the plan of equipment investment and others are reported. (Kako, I.)

  14. 15 years of production of electric energy of the Laguna Verde power plant, its plans and future; 15 anos de produccion de energia electrica de la Central Laguna Verde, sus planes y futuro

    Energy Technology Data Exchange (ETDEWEB)

    Rivera C, A [CFE, Central Laguna Verde, Km. 42.5 Carretera Cardel-Nautla, Veracruz (Mexico)

    2005-07-01

    In the year 2005 Laguna Verde power plant reaches 15 years of producing electric power in Mexico arriving to but of 100 million Megawatts-hour from their beginning of commercial activities. The Unit 1 that entered at July 29, 1990 and the Unit 2 at April 10, 1995, obtaining the Disposability Factors from their origin is: 84.63% in Unit 1 and 83.67% in Unit 2. The march of the X XI century gives big challenges of competition to the Laguna Verde Central, with the possible opening of the electric market to private investment, for their Goals and Objectives of a world class company, taking the evaluation system and qualification of the World Association of Nuclear Operators (WANO) that promotes the Excellence in the operation of the nuclear power stations in all their partners. This Association supports the development of programs that allow the monitoring of the behavior in Safety Culture, Human fulfilment, Equipment reliability, Industrial Safety, Planning, Programming and Control, Personalized Systematic Training, and the use of the Operational experience in the daily tasks. The present work tries to explain the system of evaluation/qualification of WANO, the definition of Goals and Objectives to reach the excellence and of the programs, it will present the Program of the Reliability of Equipment with its main actions the productivity. (Author)

  15. Pdvsa plans to hike productive capacity

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Venezuela's state oil company plans to jump its productive capacity by 117,000 b/d to 2.92 million b/d this year. Petroleos de Venezuela also projects sizable increases for oil and gas reserves and plans record spending in 1992. Meantime, Pdvsa is sounding a warning again about the Venezuelan government's excessive tax take amid debate within the company about spending priorities

  16. Electric Utility Generating Units: Repealing the Clean Power Plan

    Science.gov (United States)

    The Clean Power Plan established emission guidelines for states to follow in limiting carbon dioxide (CO2) emissions from existing power plants. EPA is proposing to repeal the CPP and rescind the accompanying legal memorandum.

  17. Integration of Renewable Generation in Power System Defence Plans

    DEFF Research Database (Denmark)

    Das, Kaushik

    Increasing levels of penetration of wind power and other renewable generations in European power systems pose challenges to power system security. The power system operators are continuously challenged especially when generations from renewables are high thereby reducing online capacity of conven......Increasing levels of penetration of wind power and other renewable generations in European power systems pose challenges to power system security. The power system operators are continuously challenged especially when generations from renewables are high thereby reducing online capacity......, one of them being the North East area with high share of wind power generation.The aim of this study is to investigate how renewable generations like wind power can contribute to the power system defence plans. This PhD project “Integration of Renewable Generation in Power System Defence Plans...

  18. Energy and nuclear power planning study for Thailand

    International Nuclear Information System (INIS)

    1989-08-01

    The present report describes the study conducted in co-operation with several agencies and organizations from Thailand and covers the energy and electricity requirements and the optimal expansion plans for the power generating system for this country up to year 2011. It is emphasized that the study was carried out by a team of experts from the Electricity Generating Authority of Thailand (EGAT), the National Economic and Social Development Board (NESDB), the National Energy Administration (NEA) and the Office of Atomic Energy for Peace (OAEP), who were fully responsible for all phases of the study, including the production of the present report. The IAEA's responsibility was to provide overall co-ordination and general guidance during the conduct of the study, as well as training and assistance in the implementation and use of the IAEA's computerized planning methodologies on the computer facilities of Thailand. Refs, figs and tabs

  19. Generalized production planning problem under interval uncertainty

    Directory of Open Access Journals (Sweden)

    Samir A. Abass

    2010-06-01

    Full Text Available Data in many real life engineering and economical problems suffer from inexactness. Herein we assume that we are given some intervals in which the data can simultaneously and independently perturb. We consider the generalized production planning problem with interval data. The interval data are in both of the objective function and constraints. The existing results concerning the qualitative and quantitative analysis of basic notions in parametric production planning problem. These notions are the set of feasible parameters, the solvability set and the stability set of the first kind.

  20. Fiscal planning of private electricity production projects

    International Nuclear Information System (INIS)

    Gauthier, R.

    2002-01-01

    Various fiscal considerations frequently encountered in the context of the planning of private electricity production projects were described. Two major themes were discussed: 1) the different jurisdictional vehicles that can be used during the planning of private electricity production projects and the associated fiscal considerations, and 2) the two main fiscal incentives of the Income Tax Act (Canada) which could impact on the financing and operation costs of such a project, namely the accelerated amortization and the possibility of deducting the costs associated to renewable energies and energy savings in Canada. This was a general presentation that did not go into specific details and did not represent a legal opinion. refs

  1. A simple approximation of productivity scores of fuzzy production plans

    DEFF Research Database (Denmark)

    Hougaard, Jens Leth

    2005-01-01

    This paper suggests a simple approximation procedure for the assessment of productivity scores with respect to fuzzy production plans. The procedure has a clear economic interpretation and all the necessary calculations can be performed in a spreadsheet making it highly operational...

  2. Indicators for management of planned outages in nuclear power plants

    International Nuclear Information System (INIS)

    2006-04-01

    The outages considered within the scope of this publication are planned refuelling outages (PWR and BWR nuclear power plants) and planned outages associated with major maintenance, tests and inspections (PHWR and LWGR nuclear power plants). The IAEA has published some valuable reports providing guidance and assistance to operating organizations on outage management. This TECDOC outlines main issues to be considered in outage performance monitoring and provides guidance to operating organizations for the development and implementation of outage programmes which could enhance plant safety, reliability and economics. It also complements the series of reports published by the IAEA on outage management and on previous work related to performance indicators developed for monitoring different areas of plant operation, such as safety, production, reliability and economics. This publication is based upon the information presented at a technical meeting to develop a standardized set of outage indicators for outage optimization, which was organised in Vienna, 6-9 October 2003. At this meeting, case studies and good practices relating to performance indicator utilization in the process of planned outage management were presented and discussed

  3. The Effect of Production Planning and Budgeting on Organizational Productivity

    Directory of Open Access Journals (Sweden)

    Patrick Adebisi Olusegun ADEGBUYI

    2010-12-01

    Full Text Available Improved productivity and proper organizational structure are desired by most manufacturing outfits within the highly turbulent business environment of Nigeria. With various contributing factors, scientific basis for decision making that will lead to enhanced policies for organizational operations is stronlgy established. Five statistical hypotheses which are influence of education, government policies, planning and organizational output, and production planning/budgeting and technological advancement, propounded in this work were investigated to establish a valid decision basis on a confidence level assumed to be 0.05. The work finally examined the impact of the hypotheses on productivity.

  4. Enviromental Development Plan: special nuclear materials production

    International Nuclear Information System (INIS)

    1980-07-01

    This Environmental Development Plan includes the process steps and facilities necessary for the production of plutonium and tritium for Government needs and the production of some other radioactive materials that will be used for heat and radiation sources by domestic and international customers. The production reactors and the spent fuel processing plants and their effluents are discussed, but the defense wastes from them are treated in a separate EDP. The scope does not include transportation, decontamination and decommissioning, safeguards and security, or use of the SNM products

  5. Coal gasification and the power production market

    International Nuclear Information System (INIS)

    Howington, K.; Flandermeyer, G.

    1995-01-01

    The US electric power production market is experiencing significant changes sparking interest in the current and future alternatives for power production. Coal gasification technology is being marketed to satisfy the needs of the volatile power production industry. Coal gasification is a promising power production process in which solid coal is burned to produce a synthesis gas (syn gas). The syn gas may be used to fuel combustion integrated into a facility producing electric power. Advantages of this technology include efficient power production, low flue gas emissions, flexible fuel utilization, broad capability for facility integration, useful process byproducts, and decreased waste disposal. The primary disadvantages are relatively high capital costs and lack of proven long-term operating experience. Developers of coal gasification intend to improve on these disadvantages and lop a strong position in the power generation market. This paper is a marketing analysis of the partial oxidation coal gasification processes emerging in the US in response to the market factors of the power production industry. A brief history of these processes is presented, including the results of recent projects exploring the feasibility of integrated gasification combined cycle (IGCC) as a power production alternative. The current power generation market factors are discussed, and the status of current projects is presented including projected performance

  6. Coal Power Systems strategic multi-year program plans

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  7. Crop succession requirements in agricultural production planning

    NARCIS (Netherlands)

    Klein Haneveld, W.K.; Stegeman, A.

    2005-01-01

    A method is proposed to write crop succession requirements as linear constraints in an LP-based model for agricultural production planning. Crop succession information is given in the form of a set of inadmissible successions of crops. The decision variables represent the areas where a certain

  8. Northwest conservation and electric power plan 1986. Volume I

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    This 20 year plan is prepared in accordance with the Pacific Northwest Electric Power Planning and Conservation Act - Public Law 96-501, of 1980. This Act required the Council to develop and adopt a 20-year electrical power plan for the region with a program to protect, mitigate and enhance the fish and wildlife affected by hydroelectric development in the Columbia River Basin. The plan provides a 25 year history of the regions power development and comments on its unique features and changing nature. Presentations covers problems, solutions and the planning strategy for risk management. The existing electrical power system is discussed along with future electricity needs, generating resources, conservation of resources, regional needs and resources, and the 1986 action plan. Underlying details are provided in Volume II

  9. Pre-fire planning for nuclear power plants

    International Nuclear Information System (INIS)

    Talbert, J.H.

    1980-01-01

    Regardless of the fire prevention measures which are taken, plant experience indicates that fires will occur in a nuclear power plant. When a fire occurs, the plant staff must handle the fire emergency. Pre-fire planning is a method of developing detailed fire attack plans and salvage operations to protect equipment from damage due to fire and fire fighting operations. This paper describes the purpose and use of a pre-fire plan to achieve these goals in nuclear power plants

  10. Reference costs of the electric power production

    International Nuclear Information System (INIS)

    2003-06-01

    This study periodically realized by the DGEMP aims to compare the competitiveness of the different channels of electric power production, for different utilization conditions. The first part ''reference costs of the 2003 electric power production'' examines the prices of the electric power produced by different channels in particular in the framework of the industrial implementing in 2015. The nuclear and thermal power plants are concerned. The second part is devoted to the decentralized production channels (wind energy, photovoltaic, cogeneration heat-electricity) is under construction and will be presented next year. (A.L.B.)

  11. The power of product integrity.

    Science.gov (United States)

    Clark, K B; Fujimoto, T

    1990-01-01

    In the dictionary, integrity means wholeness, completeness, soundness. In products, integrity is the source of sustainable competitive advantage. Products with integrity perform superbly, provide good value, and satisfy customers' expectations in every respect, including such intangibles as their look and feel. Consider this example from the auto industry. In 1987, Mazda put a racy four-wheel steering system in a five-door family hatchback. Honda introduced a comparable system in the Prelude, a sporty, two-door coupe. Most of Honda's customers installed the new technology; Mazda's system sold poorly. Potential customers felt the fit--or misfit--between the car and the new component, and they responded accordingly. Companies that consistently develop products with integrity are coherent, integrated organizations. This internal integrity is visible at the level of strategy and structure, in management and organization, and in the skills, attitudes, and behavior of individual designers, engineers, and operators. Moreover, these companies are integrated externally: customers become part of the development organization. Integrity starts with a product concept that describes the new product from the potential customer's perspective--"pocket rocket" for a sporty, subcompact car, for example. Whether the final product has integrity will depend on two things: how well the concept satisfies potential customers' wants and needs and how completely the concept has been embodied in the product's details. In the most successful development organizations, "heavyweight" product managers are responsible for leading both tasks, as well as for guiding the creation of a strong product concept.

  12. 76 FR 75771 - Emergency Planning Guidance for Nuclear Power Plants

    Science.gov (United States)

    2011-12-05

    ... Guidance for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of NUREG... Support of Nuclear Power Plants;'' NSIR/DPR-ISG-01, ``Interim Staff Guidance Emergency Planning for Nuclear Power Plants;'' and NUREG/CR-7002, ``Criteria for Development of Evacuation Time Estimate Studies...

  13. Power to Production: Activity Guide.

    Science.gov (United States)

    Massachusetts Univ., Lowell. Tsongas Industrial History Center.

    This field trip program consists of a 90-minute interpretive tour and a 90-minute hands-on workshop. The tour and workshop explore the role of water power in the Industrial Revolution. On the tour, students discover firsthand the unique resources of Lowell, Massachusetts, and the Park, while the workshop brings these historic resources to life as…

  14. Economic evaluation of private power production under uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Weiguo Xing; Wu, F.F. [University of Hong Kong (China). Centre for Electrical Energy Systems

    2003-02-01

    Private power production is becoming an increasingly important source of electricity generation. In developing countries, build-operate-transfer (BOT) arrangement has emerged as a dominant form of private investment. Pricing private power production at its avoided cost is the breakeven point for the utility in economic evaluation, and uncertainties must be taken into account. In this paper, an approach of calculating the breakeven cost to the utility of a BOT power plant whose contract lasts for 10-25 years is proposed. The proposed approach requires the computation of production costs from long-term generation expansion planning (GEP) under future uncertainties. To facilitate the inclusion of constraints introduced by BOT plants in GEP and uncertainties, a genetic algorithm method is utilized in GEP. The breakeven cost is a useful measure in the economic evaluation of BOT power plants. An example is presented to illustrate the economic evaluation of BOT plants using the concept of breakeven cost.(author)

  15. Reactive power planning with FACTS devices using gravitational search algorithm

    Directory of Open Access Journals (Sweden)

    Biplab Bhattacharyya

    2015-09-01

    Full Text Available In this paper, Gravitational Search Algorithm (GSA is used as optimization method in reactive power planning using FACTS (Flexible AC transmission system devices. The planning problem is formulated as a single objective optimization problem where the real power loss and bus voltage deviations are minimized under different loading conditions. GSA based optimization algorithm and particle swarm optimization techniques (PSO are applied on IEEE 30 bus system. Results show that GSA can also be a very effective tool for reactive power planning.

  16. Development of a decommissioning plan for nuclear power plant 'Krsko'

    International Nuclear Information System (INIS)

    Tankosic, Djurica; Fink, Kresimir

    1991-01-01

    Nuclear Power Plant 'Krsko' (NEK), is the only nuclear power plant in Yugoslavia, is a two-loop, Westinghouse-design, pressurized water reactor rated at 632 MWe. When NEK applied for an operating license in 1981, it did not have to explain how the plant would be decommissioned and decommissioning provisions were not part of the licensing process. Faced with mounting opposition to nuclear power and a real threat that the plant would be shut down, the plant management developed a Mission Plan for resolving the decommissioning problem. The Mission Plan calls for a preliminary decommissioning plan to be prepared and submitted to the local regulatory body before the end of 1992

  17. Power generation in the 12-th five-year plan

    International Nuclear Information System (INIS)

    Troitskij, A.A.

    1986-01-01

    The state of electric power generation in the 11-th five-year plan is summed up. Perspectives of development of heat and electric power generation in the 12-th five-year plan are considered. Thermal power generation of NPPs in 1990 will increase by a factor of 8.4 as compared with 1975. The NPP development will be mainly realized on the basis of the WWER-1000 type reactors. It is planned to commission fast reactors of up to 800 MW

  18. Productivity Research and Development Planning Workshop.

    Science.gov (United States)

    1986-03-01

    mission. These ideas must come from everyone in all echelons of the Comand. The MAC quality of worklife efforts consist of quality circles, labor-manage...that would not have been captured by the measure as initially formulated by the PIG. The balance of the plan and recommenda- tions made by the PMWG...people are doing things. We have the suggestion program, the quality of worklife program, and the Tech Mod program. All of these programs are productivity

  19. Production, staff, working time and financial planning

    Directory of Open Access Journals (Sweden)

    Orlando Boiteux

    2009-07-01

    Full Text Available Aggregate planning can be a tool for coordinating the tactical decisions belonging to some functional areas of a company. This potential has been limited due to methodological and technical reasons, but nowadays it is possible to solve very sophisticated models integrating, with a high level of detail, a great number of decisions of several functional areas and that permit to include new management schemes. In this paper, a production, staff, working time and cash management model is introduced.

  20. Energy and nuclear power planning study for Armenia

    International Nuclear Information System (INIS)

    2004-07-01

    The Energy and Nuclear Power Planning (ENPP) study for Armenia has been conducted under the technical cooperation programme of the International Atomic Energy Agency (IAEA). The objective of the study was to analyze the electricity demand as part of the total final energy demand in various scenarios of Armenian socioeconomic and technological development, and to develop economically optimized electric generating system expansion plans for meeting the electric power demand, and to assess the role that nuclear energy could play within these optimal programs. The specific objectives of this study were: to define the role that nuclear power could play in the future electricity supply in Armenia, based on a least-cost expansion planning analysis of the country's power system; to analyze the environmental impacts of such a nuclear power development; to evaluate the financial viability of the envisaged nuclear power development program; to train a group of Armenian experts in the use of the IAEA's energy models

  1. [School meals: planning, production, distribution, and adequacy].

    Science.gov (United States)

    Issa, Raquel Carvalho; Moraes, Letícia Freitas; Francisco, Raquel Rocha Jabour; dos Santos, Luana Caroline; dos Anjos, Adriana Fernandez Versiani; Pereira, Simone Cardoso Lisboa

    2014-02-01

    To evaluate the planning, production, distribution, and nutritional adequacy of meals served at city schools. This descriptive cross-sectional study was conducted between March 2011 and April 2012 and included a representative sample (n = 42 schools) of extended shift city schools from Belo Horizonte, Minas Gerais, Brazil. Five meals from each school were randomly selected and analyzed by direct weighing. Production indicators and nutritional adequacy were evaluated in contrast to the recommendations of the city food security bureau and the Brazilian National Program of School Meals (PNAE). Seventy-nine percent of the analyzed meals did not meet the recommendations of the city food security bureau. The rate of waste (food left on plates) was acceptable at 4,90%, but the rates of cooked and not served food (7,06%) and counter leftovers (5,30%) were high. Both the city planned meals and the meals served in the schools were nutritionally inadequate in terms of the PNAE, particularly for children aged 11-15 years. There was a relationship between consumption by school staff and the amount of food that was cooked (r = 0.353; P planning, production, and distribution of school meals and of food and nutrition education in order to improve the quality of food and to reduce waste in schools.

  2. Coordinated supply chain dynamic production planning model

    Science.gov (United States)

    Chandra, Charu; Grabis, Janis

    2001-10-01

    Coordination of different and often contradicting interests of individual supply chain members is one of the important issues in supply chain management because the individual members can not succeed without success of the supply chain and vice versa. This paper investigates a supply chain dynamic production planning problem with emphasis on coordination. A planning problem is formally described using a supply chain kernel, which defines supply chain configuration, management policies, available resources and objectives both at supply chain or macro and supply chain member or micro levels. The coordinated model is solved in order to balance decisions made at the macro and micro levels and members' profitability is used as the coordination criterion. The coordinated model is used to determine inventory levels and production capacity across the supply chain. Application of the coordinated model distributes costs burden uniformly among supply chain members and preserves overall efficiency of the supply chain. Influence of the demand series uncertainty is investigated. The production planning model is a part of the integrated supply chain decision modeling system, which is shared among the supply chain members across the Internet.

  3. Nuclear power enterprise tax planning strategy in the background of reform

    International Nuclear Information System (INIS)

    Wu Yimin

    2012-01-01

    The success of tax planning can be converted into enterprise's productivity, tax planning strategy can maximize the desired effects and bring out its full play to tax planning. Taking new round of tax reform in 12th five-year-plan and the reformation of professional groups as the background, the author detailedly conceived a frame of corporate tax planning strategy for nuclear power enterprises of China National Nuclear Corporation at the forefront of reformation from an all-round comprehensive view and multi-angle stand. (author)

  4. A deterministic aggregate production planning model considering quality of products

    International Nuclear Information System (INIS)

    Madadi, Najmeh; Wong, Kuan Yew

    2013-01-01

    Aggregate Production Planning (APP) is a medium-term planning which is concerned with the lowest-cost method of production planning to meet customers' requirements and to satisfy fluctuating demand over a planning time horizon. APP problem has been studied widely since it was introduced and formulated in 1950s. However, in several conducted studies in the APP area, most of the researchers have concentrated on some common objectives such as minimization of cost, fluctuation in the number of workers, and inventory level. Specifically, maintaining quality at the desirable level as an objective while minimizing cost has not been considered in previous studies. In this study, an attempt has been made to develop a multi-objective mixed integer linear programming model that serves those companies aiming to incur the minimum level of operational cost while maintaining quality at an acceptable level. In order to obtain the solution to the multi-objective model, the Fuzzy Goal Programming approach and max-min operator of Bellman-Zadeh were applied to the model. At the final step, IBM ILOG CPLEX Optimization Studio software was used to obtain the experimental results based on the data collected from an automotive parts manufacturing company. The results show that incorporating quality in the model imposes some costs, however a trade-off should be done between the cost resulting from producing products with higher quality and the cost that the firm may incur due to customer dissatisfaction and sale losses.

  5. Modeling and forecasting of electrical power demands for capacity planning

    International Nuclear Information System (INIS)

    Al-Shobaki, Salman; Mohsen, Mousa

    2008-01-01

    This paper describes the development of forecasting models to predict future generation and electrical power consumption in Jordan. This is critical to production cost since power is generated by burning expensive imported oil. Currently, the National Electric Power Company (NEPCO) is using regression models that only accounts for trend dynamics in their planning of loads and demand levels. The models are simplistic and are based on generated energy historical levels. They produce results on yearly bases and do not account for monthly variability in demand levels. The paper presents two models, one based on the generated energy data and the other is based on the consumed energy data. The models account for trend, monthly seasonality, and cycle dynamics. Both models are compared to NEPCO's model and indicate that NEPCO is producing energy at levels higher than needed (5.25%) thus increasing the loss in generated energy. The developed models also show a 13% difference between the generated energy and the consumed energy that is lost due to transmission line and in-house consumption

  6. Modeling and forecasting of electrical power demands for capacity planning

    Energy Technology Data Exchange (ETDEWEB)

    Al-Shobaki, Salman [Department of Industrial Engineering, Hashemite University, Zarka 13115 (Jordan); Mohsen, Mousa [Department of Mechanical Engineering, Hashemite University, Zarka 13115 (Jordan)

    2008-11-15

    This paper describes the development of forecasting models to predict future generation and electrical power consumption in Jordan. This is critical to production cost since power is generated by burning expensive imported oil. Currently, the National Electric Power Company (NEPCO) is using regression models that only accounts for trend dynamics in their planning of loads and demand levels. The models are simplistic and are based on generated energy historical levels. They produce results on yearly bases and do not account for monthly variability in demand levels. The paper presents two models, one based on the generated energy data and the other is based on the consumed energy data. The models account for trend, monthly seasonality, and cycle dynamics. Both models are compared to NEPCO's model and indicate that NEPCO is producing energy at levels higher than needed (5.25%) thus increasing the loss in generated energy. The developed models also show a 13% difference between the generated energy and the consumed energy that is lost due to transmission line and in-house consumption. (author)

  7. Feed Materials Production Center Waste Management Plan

    International Nuclear Information System (INIS)

    Watts, R.E.; Allen, T.; Castle, S.A.; Hopper, J.P.; Oelrich, R.L.

    1986-01-01

    In the process of producing uranium metal products used in Department of Energy (DOE) defense programs at other DOE facilities, various types of wastes are generated at the Feed Materials Production Center (FMPC). Process wastes, both generated and stored, are discussed in the Waste Management Plan and include low-level radioactive waste (LLW), mixed hazardous/radioactive waste, and sanitary/industrial waste. Scrap metal waste and wastes requiring special remediation are also addressed in the Plan. The Waste Management Plan identifies the comprehensive programs developed to address safe storage and disposition of all wastes from past, present, and future operations at the FMPC. Waste streams discussed in this Plan are representative of the waste generated and waste types that concern worker and public health and safety. Budgets and schedules for implementation of waste disposition are also addressed. The waste streams receiving the largest amount of funding include LLW approved for shipment by DOE/ORO to the Nevada Test Site (NTS) (MgF 2 , slag leach filter cake, and neutralized raffinate); remedial action wastes (waste pits, K-65 silo waste); thorium; scrap metal (contaminated and noncontaminated ferrous and copper scrap); construction rubble and soil generated from decontamination and decommissioning of outdated facilities; and low-level wastes that will be handled through the Low-Level Waste Processing and Shipping System (LLWPSS). Waste Management milestones are also provided. The Waste Management Plan is divided into eight major sections: Introduction; Site Waste and Waste Generating Process; Strategy; Projects and Operations; Waste Stream Budgets; Milestones; Quality Assurance for Waste Management; and Environmental Monitoring Program

  8. Planning and preparedness for radiological emergencies at nuclear power stations

    International Nuclear Information System (INIS)

    Thomson, R.; Muzzarelli, J.

    1996-01-01

    The Radiological Emergency Preparedness (REP) Program was created after the March 1979 accident at the Three Mile Island nuclear power station. The Federal Emergency Management Agency (FEMA) assists state and local governments in reviewing and evaluating state and local REP plans and preparedness for accidents at nuclear power plants, in partnership with the US Nuclear Regulatory Commission (NRC), which evaluates safety and emergency preparedness at the power stations themselves. Argonne National Laboratory provides support and technical assistance to FEMA in evaluating nuclear power plant emergency response exercises, radiological emergency plans, and preparedness

  9. Production planning and scheduling in refinery industry

    International Nuclear Information System (INIS)

    Persson, Jan.

    1999-01-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  10. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-07-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis.

  11. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-06-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  12. Planning for nuclear power in the Philippines

    International Nuclear Information System (INIS)

    Ibe, L.D.

    1976-01-01

    This article traces the events that led to nuclear power introduction in the Philippines starting from: the creation of National Science and Development Board and Philippine Atomic Energy Commission in 1958 under R.A. 2067; recruitment of young engineers, chemists and other scientists and their training here and abroad for the different specialized fields of nuclear energy; the creation of an inter-organizational Ad-Hoc Committee on Nuclear Power Study; initiation of a UNDP-IAEA supported Pre-Investment Study on Power Including Nuclear Power in Luzon in early 1964; enactment of R.A. 5207, the Philippine Nuclear Liability Act in 1968; second feasibility study in 1971; siting study by PAEC, NPC and MERALCO engineers; technical and economic study; organizational and financial study; and investment report. Upon receipt of the results of the feasibility studies on 31 July 1973, the President of the Philippines decided on the immediate implementation of the first nuclear plant project by the National Power Corporation (NPC). Licensing and regulation as well as manpower training with the aid of regional or international training agencies will be undertaken by PAEC

  13. Cost allocation. Combined heat and power production

    International Nuclear Information System (INIS)

    Sidzikauskas, V.

    2002-01-01

    The benefits of Combined Heat and Power (CHP) generation are discussed. The include improvement in energy intensity of 1% by 2010, 85-90% efficiency versus 40-50% of condensation power and others. Share of CHP electricity production in ERRA countries is presented.Solutions for a development CHP cost allocation are considered. Conclusion are presented for CHP production cost allocation. (R.P.)

  14. Legal consequences of the special development plan 'power plant sites' on regional planning and on guidelines for building plans

    International Nuclear Information System (INIS)

    1978-01-01

    The Special Development Plan 'Power plant sites' was made compulsory by the regulation given by the Land government in Juli 1976. For extending the energy supply system this Special Development Plan intends to provide a sufficient amount of power plant sites suitably located with regard to present and future consumption centres and permitting a cooling by means of river water while safeguarding the interests of water resources policy. The Special Development Plan established in accordance with the articles 25 and 27 of the planning law of the Land lays down that 14 specified areas are to be kept free from utilization purposes which could be opposed to the realization of power plant projects. Thus the securing of these (potential) sites has become an objective of area planning and planning of the Land in the sense of article 5 paragraph 4 of the Federal law on area planning. (orig./HP) [de

  15. Planning new coal-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    Benesch, W.A. [STEAG encotec GmbH, Essen (Germany)

    2001-07-01

    When considering fossil energy sources, it can be seen that natural gas and oil will become much scarcer than coal. Therefore, one practical option is to investigate and further develop coal-based energy supplies for the future. However, the existing coal stocks must be used very sparingly. Consequently, the conversion efficiency of the chemically-bonded energy in power and heat needs to be improved. By these means, and also by modern environmental engineering, power can be generated from coal without harming the environment. (orig.)

  16. Planning Mechanisms for Regional Electric Power Supply System Development

    Directory of Open Access Journals (Sweden)

    Evgeniy Anatolyevich Malyshev

    2015-12-01

    Full Text Available Key problems of the regional electric power supply systems are examined. These problems result from a lack of regulated interaction mechanisms for uniting the different entities’ resources aimed at the realization of investment activities. One of the main problems of the power supply industry is physical and moral aging of both generating and networking equipment. In the article, the necessity of management system formation to control the development of power sector has been proved. The deficiencies of the modern investment procedure in power companies are described. The absence of continuity between the regional and local strategic planning documents and investment planning of a power company has been found out. The possibility to develop a new mechanism for attracting investment has been proposed. The regulation of joint activities to implement the development program for the regional power supply industry has been proposed. The management system to develop the Russian power industry has been proposed. The comparative analysis of generating capacity development mechanisms has been carried out, such as capacity supply agreement (CSA, investment support mechanism (ISM, and long-term power market (LPM. The interaction procedure of the planning of the power supply infrastructure development has been described. The mechanism connecting the state sectoral and regional planning and corporate planning of power supply infrastructure development has been proposed. The regional aspects of industrial policy and its legislative support have been considered. To successfully implement the public-private-partnership (PPP projects, it is necessary to create the effective PPP model within the federal and regional legislation framework; to develop the financial model providing the recoverability of investments; to provide a mutually beneficial cooperation between executive bodies and private investors. The possibility to apply the PPP mechanism for regional

  17. Nonlinear integrated resource strategic planning model and case study in China's power sector planning

    International Nuclear Information System (INIS)

    Yuan, Jiahai; Xu, Yan; Kang, Junjie; Zhang, Xingping; Hu, Zheng

    2014-01-01

    In this paper we expand the IRSP (integrated resource strategic planning) model by including the external cost of TPPs (traditional power plants) and popularization cost of EPPs (efficiency power plants) with nonlinear functions. Case studies for power planning in China during 2011–2021 are conducted to show the efficacy of the model. Scenarios are compiled to compare the pathways of power planning under different policies. Results show that: 1) wind power will become competitive with technical learning, but its installation is undesirable when the external cost of coal power is not internalized; 2) the existence of popularization cost will hinder EPPs' (efficiency power plants) deployment and pure market mechanism is not enough to deliver EPPs at socially desirable scale; 3) imposition of progressive emission tax on coal power at an average of 0.15–0.20 RMB/KWh can remedy the market distortion and promote the development of wind power by a significant margin; 4) nuclear power will grow stably when its external cost is set no more than 0.187 RMB per KWh, or 87% of its internal cost. The proposed model can serve as a useful tool for decision support in the process of power planning and policy formulation for national government. - Highlights: • Improve IRSP model by adding nonlinear external and popularization cost. • The model is used to conduct China's power sector planning in 2011–2021. • Simulate the impacts of alternative energy policies on planning results. • The model can be used for joint power sector planning and policy design

  18. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  19. Nuclear energy products except the electric power

    International Nuclear Information System (INIS)

    2004-01-01

    Technically the fission reactors, on service or under construction, can produce other products than the electric power. Meanwhile, these applications are known since the beginning of the reactors exploitation, they never have been developed industrially. This report examines the necessary technical characteristics for using the nuclear systems on non electric power applications with an economical efficiency. What are the markets for these products? What are the strategical challenges to favor the development of non electric power applications of the nuclear energy? (A.L.B.)

  20. State regulation and power plant productivity: background and recommendations

    International Nuclear Information System (INIS)

    1980-09-01

    This report was prepared by representatives of several state regulatory agencies. It is a guide to some of the activities currently under way in state agencies to promote increased availability of electrical generating power plants. Standard measures of plant performance are defined and the nature of data bases that report such measures is discussed. It includes reviews of current state, federal, and industry programs to enhance power plant productivity and provides detailed outlines of programs in effect in California, Illinois, Michigan, New York, North Carolina, Ohio, and Texas. A number of actions are presented that could be adopted by state regulatory agencies, depending on local conditions. They include: develop a commission position or policy statement to encourage productivity improvements by utilities; coordinate state efforts with ongoing industry and government programs to improve the acquisition of power plant performance data and the maintenance of quality information systems; acquire the capability to perform independent analyses of power plant productivity; direct the establishment of productivity improvement programs, including explicit performance objectives for both existing and planned power plants, and a performance program; establish a program of incentives to motivate productivity improvement activities; and participate in ongoing efforts at all levels and initiate new actions to promote productivity improvements

  1. Photovoltaic power production figures in 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Worldwide figures of photovoltaic power production (in Mw) along 1992 are presented. Worldwide production of modules per manufacturing technology and per manufacturing companies in Europe, USA and Japan are provided as well. The review has used the following sources: ''PV News'', ''PV insider's report'' and ''systems solars''. (Author)

  2. Powering the people: India's capacity expansion plans

    Energy Technology Data Exchange (ETDEWEB)

    Patel, S.

    2009-05-15

    India has become a global business power even though hundreds of millions of its citizens still live in poverty. To sustain economic growth and lift its people out of poverty, India needs more and more reliable power. Details of government plans for achieving those goals demonstrate that pragmatism may be in shorter supply than ambition and political will. 1 ref., 12 figs., 1 tab.

  3. Safety planning for nuclear power stations

    International Nuclear Information System (INIS)

    Tadmor, J.

    1979-01-01

    The article shows that compared to the many industries and other human activities, nuclear power stations are among the safest. A short description of the measures taken to prevent accidents and of the additional safety means entering into action if an accident does occur is presented. It is shown that in nuclear plants the death frequency following malfunctioning is 1 death in 100.000 years whereas deaths following other human activities is 1 in 2 to 100 years and following natural calamities like earthquakes and floods is 1 in 10 years. As an example it is shown that for a population of 15.000.000 living in a radius of 40 km around 100 power stations the average number of deaths will be of 2 per year as compared to 4200 from road accidents with the corresponding number of injuries of 20 and 375.000 respectively. (B.G.)

  4. Nuclear power planning study for Venezuela

    International Nuclear Information System (INIS)

    1978-01-01

    The optimum capacity for nuclear power plants that might be built in Venezuela in the period 1985-2000 and the best time for incorporating them into the electric system is defined. The most recent forecasts regarding growth of the population and demand, and of the economy in general, and the taking into account the costs for the fossil-fuel and hydroelectric resources known to exist in Venezuela, as compared with the costs of importing uranium, are discussed

  5. Planning a revolution in nuclear power technology

    International Nuclear Information System (INIS)

    Egan, J.R.

    1987-01-01

    Approaching the marketing and deployment of small, inherently safe reactors from the standpoint of the legal and financial community, the author suggests various ideal planning criteria that should be adhered to by designers and suppliers in order for the new plants to achieve political and financial acceptability. Although new nuclear technology based on those criteria promise to rekindle the prospects for nuclear fission, neither governments nor suppliers are likely to undertake the requisite investments. Rather, the author proposes a private development initiative between the political community, private investors, and would-be suppliers. (author)

  6. Atmospheric science and power production

    Energy Technology Data Exchange (ETDEWEB)

    Randerson, D. (ed.)

    1984-07-01

    This is the third in a series of scientific publications sponsored by the US Atomic Energy Commission and the two later organizations, the US Energy Research and Development Adminstration, and the US Department of Energy. The first book, Meteorology and Atomic Energy, was published in 1955; the second, in 1968. The present volume is designed to update and to expand upon many of the important concepts presented previously. However, the present edition draws heavily on recent contributions made by atmospheric science to the analysis of air quality and on results originating from research conducted and completed in the 1970s. Special emphasis is placed on how atmospheric science can contribute to solving problems relating to the fate of combustion products released into the atmosphere. The framework of this book is built around the concept of air-quality modeling. Fundamentals are addressed first to equip the reader with basic background information and to focus on available meteorological instrumentation and to emphasize the importance of data management procedures. Atmospheric physics and field experiments are described in detail to provide an overview of atmospheric boundary layer processes, of how air flows around obstacles, and of the mechanism of plume rise. Atmospheric chemistry and removal processes are also detailed to provide fundamental knowledge on how gases and particulate matter can be transformed while in the atmosphere and how they can be removed from the atmosphere. The book closes with a review of how air-quality models are being applied to solve a wide variety of problems. Separate analytics have been prepared for each chapter.

  7. DYNAMIC PROGRAMMING – EFFICIENT TOOL FOR POWER SYSTEM EXPANSION PLANNING

    Directory of Open Access Journals (Sweden)

    SIMO A.

    2015-03-01

    Full Text Available The paper isfocusing on dynamic programming use for power system expansion planning (EP – transmission network (TNEP and distribution network (DNEP. The EP problem has been approached from the retrospective and prospective point of view. To achieve this goal, the authors are developing two software-tools in Matlab environment. Two techniques have been tackled: particle swarm optimization (PSO and genetic algorithms (GA. The case study refers to Test 25 buses test power system developed within the Power Systems Department.

  8. Station planning and design incorporating modern power system practice

    CERN Document Server

    Martin, PC

    1991-01-01

    The planning and design of new power stations can involve complex interaction between the many engineering disciplines involved as well as environmental, planning, economical, political and social pressures. This volume aims to provide a logical review of the procedures involved in power station development. The engineering aspects are outlined in detail, with examples, showing the basis of the relationships involved together with ""non-engineering"" factors so that the engineer can draw on the information provided for specific projects. The civil engineering and building of power stations are

  9. An Interactive Simulation Tool for Production Planning in Bacon Factories

    DEFF Research Database (Denmark)

    Nielsen, Jens Frederik Dalsgaard; Nielsen, Kirsten Mølgaard

    1994-01-01

    The paper describes an interactive simulation tool for production planning in bacon factories. The main aim of the tool is to make it possible to combine the production plans of all parts of the factory......The paper describes an interactive simulation tool for production planning in bacon factories. The main aim of the tool is to make it possible to combine the production plans of all parts of the factory...

  10. Working memory and planning during sentence production.

    Science.gov (United States)

    Martin, Randi C; Yan, Hao; Schnur, Tatiana T

    2014-10-01

    Speakers retrieve conceptual, syntactic and lexical information in advance of articulation during sentence production. What type of working memory (WM) store is used to hold the planned information before speaking? To address this question, we measured onset latencies when subjects produced sentences that began with either a complex or a simple initial noun phrase, while holding semantic, phonological or spatial information in WM. Although we found that subjects had longer onset latencies for sentences beginning with a complex noun phrase, showing a phrasal scope of planning, the magnitude of this complexity effect was not affected by any type of WM load. However, subjects made more syntactic errors (but not lexical errors) for sentences beginning with a complex noun phrase, suggesting that advance planning for these phrases occurs at a syntactic rather than lexical-semantic level, which may account for the lack of effect with various types of WM load in the current study. Copyright © 2014 Elsevier B.V. All rights reserved.

  11. Power generation planning: a survey from monopoly to competition

    International Nuclear Information System (INIS)

    Kagiannas, A.G.; Askounis, D.T.; Psarras, J.

    2004-01-01

    During the last two decades electric power generation industry in many countries and regions around the world has undergone a significant transformation from being a centrally coordinated monopoly to a deregulated liberalized market. In the majority of those countries, competition has been introduced through the adoption of a competitive wholesale electricity spot market. Short-term efficiency of power generators under competitive environment has attracted considerable effort from researchers, while long-term investment performance has received less attention. In this context, the paper aims to serve as a comprehensive review basis for generation planning methods applied in a competitive electric power generation market. The traditional modeling techniques developed for generation expansion planning under monopoly are initially presented in an effort to assess the evolution of generation planning according to the evolution of the structure of the electric power market. (author)

  12. Electricity production by advanced biomass power systems

    Energy Technology Data Exchange (ETDEWEB)

    Solantausta, Y [VTT Energy, Espoo (Finland). Energy Production Technologies; Bridgwater, T [Aston Univ. Birmingham (United Kingdom); Beckman, D [Zeton Inc., Burlington, Ontario (Canada)

    1996-11-01

    This report gives the results of the Pyrolysis Collaborative Project organized by the International Energy Agency (IEA) under Biomass Agreement. The participating countries or organizations were Canada, European Community (EC), Finland, United States of America, and the United Kingdom. The overall objective of the project was to establish baseline assessments for the performance and economics of power production from biomass. Information concerning the performance of biomass-fuelled power plants based on gasification is rather limited, and even less data is available of on pyrolysis based power applications. In order to gain further insight into the potential for these technologies, this study undertook the following tasks: (1) Prepare process models to evaluate the cost and performance of new advanced biomass power production concepts, (2) Assess the technical and economic uncertainties of different biomass power concepts, (3) Compare the concepts in small scale and in medium scale production (5 - 50 MW{sub e}) to conventional alternatives. Processes considered for this assessment were biomass power production technologies based on gasification and pyrolysis. Direct combustion technologies were employed as a reference for comparison to the processes assessed in this study. Wood was used a feedstock, since the most data was available for wood conversion

  13. Decommissioning planning of Swedish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hedin, Gunnar; Bergh, Niklas [Westinghouse Electric Sweden AB, Vaesteraes (Sweden)

    2013-07-01

    The technologies required for the decommissioning work are for the most part readily proven. Taken into account that there will be many more years before the studied reactor units will undergo decommissioning, the techniques could even be called conventional at that time. This will help bring the decommissioning projects to a successful closure. A national waste fund is already established in Sweden to finance amongst others all dismantling and decommissioning work. This will assure that funding for the decommissioning projects is at hand when needed. All necessary plant data are readily available and this will, combined with a reliable management system, expedite the decommissioning projects considerably. Final repositories for both long- and short-lived LILW respectively is planned and will be constructed and dimensioned to receive the decommissioning waste from the Swedish NPP:s. Since the strategy is set and well thought-through, this will help facilitate a smooth disposal of the radioactive decommissioning waste. (orig.)

  14. Nuclear power - strategic planning for the next generation

    International Nuclear Information System (INIS)

    Turner, K.H.

    1989-01-01

    Regardless of the real or perceived causes of the nuclear power industry's current difficulties, a number of recent trends-increasing electricity demand, foreign oil dependency, and attention paid to acid rain and the greenhouse effect-taken together, point of the most favorable atmosphere in recent history for nuclear power. Already, serious public discussion of its advantages have begun anew. Thus, the time is ripe to consider the developmental structure of nuclear power's next generation. Although much uncertainty still surrounds the nuclear industry, valuable lessons have been learned, and the evolution of the industry from this point cannot be left to chance. The purpose of this paper is to discuss a framework for nuclear power strategic planning activities. The strategic planning objectives outlined in this paper span issues that affect virtually every aspect of the nuclear power industry. Piecemeal responses to the vagaries of random stimuli will not be adequate. A proactive, integrated, industry-wide initiative-an Institute of Nuclear Power Planning, actively supported by the members of the industry-should be undertaken immediately to fill the strategic planning role. In so doing, the industry will not only be acting in its own best interest but will also be helping the nation realize the real and important benefits of its nuclear power technology

  15. Tenneessee Valley Authority office of nuclear power management development plan

    International Nuclear Information System (INIS)

    Clements, L.L.

    1985-01-01

    The Tennessee Valley Authority's Management Development Plan is discussed and consists of an analysis of each managerial position, an analysis of each individual manager's and potential manager's qualifications and training and a comparison of the two. From this comparison two products are derived: a management replacement plan and an individual development plan for each nuclear employee. The process of the program is described in detail

  16. Production LHC HTS power lead test results

    CERN Document Server

    Tartaglia, M; Fehér, S; Huang, Y; Orris, D F; Pischalnikov, Y; Rabehl, Roger Jon; Sylvester, C D; Zbasnik, J

    2005-01-01

    The Fermilab Magnet test facility has built and operated a test stand to characterize the performance of HTS power leads. We report here the results of production tests of 20 pairs of 7.5 kA HTS power leads manufactured by industry for installation in feed boxes for the LHC Interaction Region quadrupole strings. Included are discussions of the thermal, electrical, and quench characteristics under "standard" and "extreme" operating conditions, and the stability of performance across thermal cycles.

  17. Production LHC HTS power lead test results

    International Nuclear Information System (INIS)

    Tartaglia, M.A.; Carcagno, R.H.; Feher, S.; Huang, Y.; Orris, D.F.; Pischalnikov, Y.; Rabehl, R.J.; Sylvester, C.; Zbasnik, J.

    2004-01-01

    The Fermilab Magnet test facility has built and operated a test stand to characterize the performance of HTS power leads. We report here the results of production tests of 20 pairs of 7.5 kA HTS power leads manufactured by industry for installation in feed boxes for the LHC Interaction Region quadrupole strings. Included are discussions of the thermal, electrical, and quench characteristics under ''standard'' and ''extreme'' operating conditions, and the stability of performance across thermal cycles

  18. Developing and assessing accident management plans for nuclear power plants

    International Nuclear Information System (INIS)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A.

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate

  19. Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data

  20. Economic market design and planning for electric power systems

    CERN Document Server

    Mili, Lamine

    2010-01-01

    Discover cutting-edge developments in electric power systems. Stemming from cutting-edge research and education activities in the field of electric power systems, this book brings together the knowledge of a panel of experts in economics, the social sciences, and electric power systems. In ten concise and comprehensible chapters, the book provides unprecedented coverage of the operation, control, planning, and design of electric power systems. It also discusses:. A framework for interdisciplinary research and education;. Modeling electricity markets;. Alternative economic criteria and proactiv.

  1. Optimum operation of a small power production facility

    Energy Technology Data Exchange (ETDEWEB)

    Capehart, B.L.; Mahoney, J.F.; Sivazlian, B.D.

    1983-09-01

    To help reduce the U.S.A.'s dependence on imported oil for electrical power generation, the 1978 National Energy Act established regulations to promote construction and operation of cogeneration and small power production facilities. Many of these facilities are presently under construction, with a great number planned. This paper examines the operation of a small power production facility with on-site generation and storage, on-site use, and connection to an electric utility grid system for the purpose of both selling excess power and buying power. It is assumed that the buying and selling price of electricity varies frequently during the day and that the relevant price and demand data may be accurately projected into the near future. With this system description, a mathematical model is formulated and solved by linear programming to obtain a series of periodic buy and sell decisions so as to maximize the profit from operating the small power production facility. Results are presented to illustrate the methodology for determining potential profits.

  2. Ownership and efficiency in nuclear power production

    International Nuclear Information System (INIS)

    Pollitt, M.G.

    1995-01-01

    This paper aims to contribute to the relatively small amount of academic literature on the efficiency of nuclear power production. The author draws on world-wide comparisons to illustrate the situation in the United Kingdom, where the nuclear generating capacity, conceived of and constructed as a public concern, has recently been privatised. The theory and evidence for links between ownership and productive efficiency is received. Efficiency measures used are explained as are the linear programs required to generate them. Data Envelopment Analysis (DEA) is used to analyse productive efficiency of nuclear power plants before and after privatisation. Results of the DEA are used to test the hypothesis that ownership has no effect on productive efficiency. (UK)

  3. Life Cycle Assessment of Coal-fired Power Production

    Energy Technology Data Exchange (ETDEWEB)

    Spath, P. L.; Mann, M. K.; Kerr, D. R.

    1999-09-01

    Coal has the largest share of utility power generation in the US, accounting for approximately 56% of all utility-produced electricity (US DOE, 1998). Therefore, understanding the environmental implications of producing electricity from coal is an important component of any plan to reduce total emissions and resource consumption. A life cycle assessment (LCA) on the production of electricity from coal was performed in order to examine the environmental aspects of current and future pulverized coal boiler systems. Three systems were examined: (1) a plant that represents the average emissions and efficiency of currently operating coal-fired power plants in the US (this tells us about the status quo), (2) a new coal-fired power plant that meets the New Source Performance Standards (NSPS), and (3) a highly advanced coal-fired power plant utilizing a low emission boiler system (LEBS).

  4. Maintenance in nuclear production power plants

    International Nuclear Information System (INIS)

    Lozano, J. M.

    2010-01-01

    This article highlights the importance and quality of maintenance in the complete phases of development, in a sector which has been often questioned by the public opinion, and that is always subject to national and international standards. The aim of maintenance is to guarantee the production of electric power in a reliable, safe, economic and friendly environmentally way, assuring a long-term production. (Author)

  5. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  6. The planning of areas near nuclear power stations

    International Nuclear Information System (INIS)

    1977-01-01

    During the past five years national physical planning has been initiated by the Swedish Parliament. Guidelines have been given to the communities how to consider national interests when drawing up local planning and how to produce maps and descriptions of the planning. For the planning of the areas near the nuclear power stations the municipalities have certain guidelines from The Nuclear Power Inspectorate and The National Institute of Radiation Protection. It is advised to keep a low population density near the power plants, to avoid the type of harbour or industry which could have disturbing effects on the power plant and also to avoid to concentrate people, who are difficult to move from the area in case of an accident (i.e., homes for old people, maternity homes and prisons). The plants on the East Coast, Forsmark and Oskarshamn, are located in wooded areas with a very low population density. On the West Coast, near Ringhals and Barsebaeck, the population density is higher, and there is one village with about 2,000 inhabitants, situated at a distance of two (2) km from the Ringhals power plant. The Control Boards are now reluctant to concentrate more people in this village, where schools and shops were earlier planned for 3,000 inhabitants. The building activity near power plants is regulated by law. New buildings are prohibited within a distance of two (2) km from the plants. Some exeptions can be granted by the County Administrative Board after guidance from the Central Board. In a zone reaching 10 kilometers from the power plants there are no regulations by law about new buildings, except the earlier mentioned guidelines from the Central Boards to maintain a low population. (L.E.)

  7. Power and LPG production with LNG import

    International Nuclear Information System (INIS)

    Mak, J.Y.

    2004-01-01

    When used in power cogeneration, Liquefied Natural Gas (LNG) is both energy efficient and can eliminate seawater or fuel gas consumption as well as the associated environmental impacts of conventional regasification processes. However, some liquefied natural gas (LNG) sources have heating values higher than current North American natural gas pipelines can allow for. LNG from these cannot be injected into gas pipelines without several heating control processing steps. This paper outlines two new technologies developed to address this issue. The first is a power cogeneration process using LNG as a heat sink. The second technology involves a fractionation process removing Liquid Propane Gas (LPG) components from imported LNG, thereby controlling heat value. Both technologies are applicable in grassroots installations as well as being suitable for retrofitting to existing LNG regasification for power generation and LPG production. It was concluded that power cogeneration with a mixed fluid power cycle recovered a significant portion of energy in LNG liquefaction plants. Additionally, it was also possible to fractionate high quality LPG from LNG at a low cost, with the residue being further re-condensed and re-utilized for power generation. It was also concluded that the LNG fractionation process would add flexibility to the LNG receiving terminals, allowing the import of lower quality LNG to North America, while also generating additional revenues from LPG production. 3 refs., 5 tabs., 6 figs

  8. Synfuel (hydrogen) production from fusion power

    International Nuclear Information System (INIS)

    Krakowski, R.A.; Cox, K.E.; Pendergrass, J.H.; Booth, L.A.

    1979-01-01

    A potential use of fusion energy for the production of synthetic fuel (hydrogen) is described. The hybrid-thermochemical bismuth-sulfate cycle is used as a vehicle to assess the technological and economic merits of this potential nonelectric application of fusion power

  9. Design, Results and Plans for Power Beaming Competitive Challenge

    International Nuclear Information System (INIS)

    Shelef, Ben

    2008-01-01

    In our context, Power Beaming refers to the extraction of useable electrical power from a directed electromagnetic beam. In order to promote interest in this technology, the Spaceward Foundation proposed and is managing a technology prize challenge based on a Space Elevator design scenario. The challenge has a prize purse of $2M, provided by NASA's Centennial Challenges office. This paper covers the considerations that went into the design of the challenge, a brief chronology of past results, and plans for the future

  10. A review of planning models for maintenance and production.

    NARCIS (Netherlands)

    G. Budai-Balke (Gabriella); R. Dekker (Rommert); R.P. Nicolai (Robin)

    2006-01-01

    textabstractIn this article we give an overview of the relation between planning of maintenance and production. On the one hand we consider production planning and scheduling models in which failures and maintenance aspects are taken into account. Next we discuss the planning of maintenance

  11. Innovative insurance plan promises to leverage green power

    International Nuclear Information System (INIS)

    Edge, Gordon

    1999-01-01

    This article explains the gap between customers of green power signing short term (1-2 year) contracts and the banks wanting power purchase agreements for ten or more years before lending on new projects. Details are given of a new initiative from the US green power industry for a green premium for green power marketeers with the idea of an insurance product to take some of the risk and bridge the gap. Examples of coverage under the green power insurance proposal are discussed, and the funding and implementation of the scheme, and the effect of the insurance are considered

  12. Cobalt-60 production in CANDU power reactors

    International Nuclear Information System (INIS)

    Malkoske, G.R.; Norton, J.L.; Slack, J.

    2002-01-01

    MDS Nordion has been supplying cobalt-60 sources to industry for industrial and medical purposes since 1946. These cobalt-60 sources are used in many market and product segments, but are primarily used to sterilize single-use medical products including; surgical kits, gloves, gowns, drapes, and cotton swabs. Other applications include sanitization of cosmetics, microbial reduction of pharmaceutical raw materials, and food irradiation. The technology for producing the cobalt-60 isotope was developed by MDS Nordion and Atomic Energy of Canada Limited (AECL) almost 55 years ago using research reactors at the AECL Chalk River Laboratories in Ontario, Canada. The first cobalt-60 source produced for medical applications was manufactured by MDS Nordion and used in cancer therapy. The benefits of cobalt-60 as applied to medical product manufacturing, were quickly realized and the demand for this radioisotope quickly grew. The same technology for producing cobalt-60 in research reactors was then designed and packaged such that it could be conveniently transferred to a utility/power reactor. In the early 1970's, in co-operation with Ontario Power Generation (formerly Ontario Hydro), bulk cobalt-60 production for industrial irradiation applications was initiated in the four Pickering A CANDU reactors. As the demand and acceptance of sterilization of medical products grew, MDS Nordion expanded its bulk supply by installing the proprietary Canadian technology for producing cobalt-60 in additional CANDU reactors. CANDU is unique among the power reactors of the world, being heavy water moderated and fuelled with natural uranium. They are also designed and supplied with stainless steel adjusters, the primary function of which is to shape the neutron flux to optimize reactor power and fuel bum-up, and to provide excess reactivity needed to overcome xenon-135 poisoning following a reduction of power. The reactor is designed to develop full power output with all of the adjuster

  13. National contingency plan product schedule data base

    International Nuclear Information System (INIS)

    Putukian, J.; Hiltabrand, R.R.

    1993-01-01

    During oil spills there are always proposals by the technical community and industry to use chemical agents to help in oil spill cleanups. Federal Clean Water Act regulations require that any chemical agents that the federal on-scene coordinator (FOSC) wants to use for oil cleanup be listed on the US Environmental Protection Agency (EPA) National Contingency Plan (NCP) Product Schedule. Chemical countermeasures are among the most controversial, complex, and time-critical issues facing decision-making officials choosing response methods to use on coastal oil spills. There are situations in which dispersants are likely to be one of the most appropriate counter-measure strategies. Dispersants are most effective when applied to fresh oil, and their effectiveness dramatically decreases as the oil weathers, which can begin in as little as 24 hours. To logistically implement dispersant use, a decision would need to be made within roughly the first 4 hours after the release. Most of the information that the FOSC needs to make the determination to use a specific chemical agent exists in manuals, EPA bulletins, and the published literature. This information is not in an easy-to-use format under field emergency conditions. Hence the need to collect and disseminate the information in an automated data base. The sources for the information in this data base are the following. Published results of tests performed by Environment Canada; EPA bulletins associated with the NCP Product Schedule; Published results of tests by the chemical industry. The data base resides on a Macintosh computer and contains information about 70 NCP products, including dispersants, surface collecting agents, and biological additives. It contains information on physical properties, toxicity, heavy metal content, safety precautions, use conditions, etc

  14. What about improving the productivity of electric power plants

    International Nuclear Information System (INIS)

    Lawroski, H.; Knecht, P.D.; Prideaux, D.L.; Zahner, R.R.

    1976-01-01

    The FEA in April of 1974 established an Interagency Task Group on Power Plant Reliability, which was charged with the broad objective of improving the productivity of existing and planned large fossil-fueled and nuclear power plants. It took approximately 11 months for the task force to publish a report, ''Report on Improving the Productivity of Electrical Power Plants'' (FEA-263-G), a detailed analysis and comparison of successful and below-average-performance power plants. The Nuclear Service Corp. portion of this study examined four large central-station power plants: two fossil (coal) and two nuclear plants. Only plants with electrical generation capacities greater than 400 MWe were considered. The study included the following: staff technical skill, engineering support, QA program, plant/corporate coordination, operation philosophy, maintenance programs, federal/state regulations, network control, and equipment problems. Personnel were interviewed, and checklists providing input from some 21 or more plant and corporate personnel of each utility were utilized. Reports and other documentation were also reviewed. It was recognized early that productivity is closely allied to technical skills and positive motivation. For this reason, considerable attention was given to people in this study

  15. Ways of looking ahead: hierarchical planning in language production.

    Science.gov (United States)

    Lee, Eun-Kyung; Brown-Schmidt, Sarah; Watson, Duane G

    2013-12-01

    It is generally assumed that language production proceeds incrementally, with chunks of linguistic structure planned ahead of speech. Extensive research has examined the scope of language production and suggests that the size of planned chunks varies across contexts (Ferreira & Swets, 2002; Wagner & Jescheniak, 2010). By contrast, relatively little is known about the structure of advance planning, specifically whether planning proceeds incrementally according to the surface structure of the utterance, or whether speakers plan according to the hierarchical relationships between utterance elements. In two experiments, we examine the structure and scope of lexical planning in language production using a picture description task. Analyses of speech onset times and word durations show that speakers engage in hierarchical planning such that structurally dependent lexical items are planned together and that hierarchical planning occurs for both direct and indirect dependencies. Copyright © 2013 Elsevier B.V. All rights reserved.

  16. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  17. New Brunswick Power Corporation: Business plan, 1994-1999

    International Nuclear Information System (INIS)

    1994-02-01

    The first publicly available business plan for the New Brunswick Power Corp. is presented. The five-year plan provides an overview of the Corporation's performance and directions, including possible future rate increases. A review of the corporate history of the utility is followed by a description of the strategic framework under which the Corporation conducts its business operations. The information presented includes customer requirements, power generation and transmission, system operations, personnel management, environmental protection, and external factors affecting operations. This overview demonstrates the complex issues facing the utility, the choices made in the past, and the matters that will have to be faced in the future. The business overview is followed by focused business plans in six key functional areas (facilities, operations, personnel, technology, environment, and finances) and comprehensive financial forecasts that outline a commitment to maintain competitive rates for customers. The reasoning behind the forecasts is explained and a glossary is included. 21 figs., 16 tabs

  18. Short time ahead wind power production forecast

    International Nuclear Information System (INIS)

    Sapronova, Alla; Meissner, Catherine; Mana, Matteo

    2016-01-01

    An accurate prediction of wind power output is crucial for efficient coordination of cooperative energy production from different sources. Long-time ahead prediction (from 6 to 24 hours) of wind power for onshore parks can be achieved by using a coupled model that would bridge the mesoscale weather prediction data and computational fluid dynamics. When a forecast for shorter time horizon (less than one hour ahead) is anticipated, an accuracy of a predictive model that utilizes hourly weather data is decreasing. That is because the higher frequency fluctuations of the wind speed are lost when data is averaged over an hour. Since the wind speed can vary up to 50% in magnitude over a period of 5 minutes, the higher frequency variations of wind speed and direction have to be taken into account for an accurate short-term ahead energy production forecast. In this work a new model for wind power production forecast 5- to 30-minutes ahead is presented. The model is based on machine learning techniques and categorization approach and using the historical park production time series and hourly numerical weather forecast. (paper)

  19. Short time ahead wind power production forecast

    Science.gov (United States)

    Sapronova, Alla; Meissner, Catherine; Mana, Matteo

    2016-09-01

    An accurate prediction of wind power output is crucial for efficient coordination of cooperative energy production from different sources. Long-time ahead prediction (from 6 to 24 hours) of wind power for onshore parks can be achieved by using a coupled model that would bridge the mesoscale weather prediction data and computational fluid dynamics. When a forecast for shorter time horizon (less than one hour ahead) is anticipated, an accuracy of a predictive model that utilizes hourly weather data is decreasing. That is because the higher frequency fluctuations of the wind speed are lost when data is averaged over an hour. Since the wind speed can vary up to 50% in magnitude over a period of 5 minutes, the higher frequency variations of wind speed and direction have to be taken into account for an accurate short-term ahead energy production forecast. In this work a new model for wind power production forecast 5- to 30-minutes ahead is presented. The model is based on machine learning techniques and categorization approach and using the historical park production time series and hourly numerical weather forecast.

  20. Early environmental planning: A process for power line corridor selection

    International Nuclear Information System (INIS)

    Haagenstad, T.; Bare, C.M.

    1998-01-01

    Los Alamos National Laboratory (LANL) conducted an environmental planning study in the fall of 1997 to help determine the best alternative for upgrading the Laboratory's electrical power system. Alternatives considered included an on-site power generation facility and two corridors for a 10-mile-long 115-kV power line. This planning process was conducted prior to the formal National Environmental Policy Act (NEPA) review. The goals were to help select the best proposed action, to recommend modifications and mitigation measures for each alternative for a more environmentally sound project, and to avoid potential delays once the formal Department of Energy review process began. Significant constraints existed from a planning perspective, including operational issues such as existing outdoor high explosives testing areas, as well as environmental issues including threatened and endangered species habitats, multiple archeological sites, contaminated areas, and aesthetics. The study had to be completed within 45 days to meet project schedule needs. The process resulted in a number of important recommendations. While the construction and operation of the on-site power generation facility could have minimal environmental impacts, the need for a new air quality permit would create severe cost and schedule constraints for the project. From an environmental perspective, construction and operation of a power line within either corridor was concluded to be a viable alternative. However, impacts with either corridor would have to be reduced through specific recommended alignment modifications and mitigation measures

  1. Opportunity study and a business plan for a wind power plant

    International Nuclear Information System (INIS)

    Nikolov, Marjan; Naumov, Risto

    2006-01-01

    This paper provides illustration of opportunity study and a business plan for utilizing the wind renewable resource for electricity production in Macedonia. The study is prepared under UNIDO recommendations for feasibility studies (see [1]) and following the IAS, by Marjan Nikolov and Risto Naumov. This is a project simulation for a small wind farm comprising 3 power plant units. We use price list from 'Proven Engineering Products Ltd' UK.

  2. Tactical supply chain planning for a forest biomass power plant under supply uncertainty

    International Nuclear Information System (INIS)

    Shabani, Nazanin; Sowlati, Taraneh; Ouhimmou, Mustapha; Rönnqvist, Mikael

    2014-01-01

    Uncertainty in biomass supply is a critical issue that needs to be considered in the production planning of bioenergy plants. Incorporating uncertainty in supply chain planning models provides improved and stable solutions. In this paper, we first reformulate a previously developed non-linear programming model for optimization of a forest biomass power plant supply chain into a linear programming model. The developed model is a multi-period tactical-level production planning problem and considers the supply and storage of forest biomass as well as the production of electricity. It has a one-year planning horizon with monthly time steps. Next, in order to incorporate uncertainty in monthly available biomass into the planning, we develop a two-stage stochastic programming model. Finally, to balance the risk and profit, we propose a bi-objective model. The results show that uncertainty in availability of biomass has an additional cost of $0.4 million for the power plant. Using the proposed stochastic optimization model could reduce this cost by half. - Highlights: • Developed a two-stage stochastic optimization model to consider supply uncertainty. • Maximized the profit of a forest biomass power plant value chain. • Minimized two risk measures, variability index and downside risk, to manage risks. • Stochastic optimization model provided feasible solution for all scenarios. • Results showed a trade-off between profit and risk management

  3. Environmental impacts of power plants and transmission lines in power system planning

    International Nuclear Information System (INIS)

    Miracapillo, C.; Moreschini, G.; Rome Univ. 'La Sapienza'

    1992-01-01

    This paper deals with a criterion to assess the environmental impacts of power plants and transmission lines in power system planning. First, the effects of hydro-plants, thermal plants and transmission lines are reviewed. Then, a number of methods for the evaluation of the environmental impacts of civil and industrial plants are described. A new criterion is proposed to introduce the evaluation of the environmental impact and related costs into methods for power system planning. Finally, the criterion is applied to a simple case

  4. Virtual Factory Framework for Supporting Production Planning and Control.

    Science.gov (United States)

    Kibira, Deogratias; Shao, Guodong

    2017-01-01

    Developing optimal production plans for smart manufacturing systems is challenging because shop floor events change dynamically. A virtual factory incorporating engineering tools, simulation, and optimization generates and communicates performance data to guide wise decision making for different control levels. This paper describes such a platform specifically for production planning. We also discuss verification and validation of the constituent models. A case study of a machine shop is used to demonstrate data generation for production planning in a virtual factory.

  5. Major factors influencing craft productivity in nuclear power plant construction

    International Nuclear Information System (INIS)

    Borcherding, J.D.; Sebastian, S.J.

    1980-01-01

    This paper reports on a research study whose objective was to determine the most influential factors adversely affecting craft productivity in nuclear power plant construction from the perspective of the tradesmen employed at the sites. Data were collected through the use of a questionnaire survey and group interview sessions, predominantly with workmen, at six nuclear power plant construction projects. Craftsmen were chosen as the major data base because of their awareness of how their time would actually be spent on the project. Topics considered include the factors influencing craft productivity, material availability, redoing work, crew interfacing, overcrowded work areas, instruction time, inspection delays, craft turnover, craft absenteeism, foreman changes, foreman incompetence, engineering design lead time, comprehensive scheduling of the design function, the responsibility of the utility, value engineering, plant standardization, the effective utilization of the planning and scheduling system, and the labor-management committee

  6. Scenarios of hydrogen production from wind power

    Energy Technology Data Exchange (ETDEWEB)

    Klaric, Mario

    2010-09-15

    Since almost total amount of hydrogen is currently being produced from natural gas, other ways of cleaner and 'more renewable' production should be made feasible in order to make benchmarks for total 'hydrogen economy'. Hydrogen production from wind power combined with electrolysis imposes as one possible framework for new economy development. In this paper various wind-to-hydrogen scenarios were calculated. Cash flows of asset based project financing were used as decision making tool. Most important parameters were identified and strategies for further research and development and resource allocation are suggested.

  7. Corrosion products in power generating systems

    International Nuclear Information System (INIS)

    Lister, D.H.

    1980-06-01

    The important mechanisms of corrosion and corrosion product movement and fouling in the heat transport systems of thermal electric generating stations are reviewed. Oil- and coal-fired boilers are considered, along with nuclear power systems - both direct and indirect cycle. Thus, the fireside and waterside in conventional plants, and the primary coolant and steam-raising circuits in water-cooled reactors, are discussed. Corrosion products in organic- and liquid-metal-cooled reactors also are shown to cause problems if not controlled, while their beneficial effects on the cooling water side of condensers are described. (auth)

  8. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  9. Green power: A renewable energy resources marketing plan

    International Nuclear Information System (INIS)

    Barr, R.C.

    1997-01-01

    Green power is electricity generated from renewable energy sources such as power generated from the sun, the wind, the heat of the earth, and biomass. Green pricing is the marketing strategy to sell green power to customers who voluntarily pay a premium for it. Green pricing is evolving from the deregulation of the electric industry, the need for clean air, reflected in part as concern over global warming, and technology advances. The goal of the renewable energy marketing plan is to generate enough revenues for a utility to fund power purchase agreements (PPAs) with renewable energy developers or construct its own renewable facilities. Long-term, fixed price PPAs enable developers to obtain financing to construct new facilities, sometimes taking technological risks which a utility might not take otherwise. The marketing plan is built around different rate premiums for different categories of ratepayers, volunteer customer participation, customer participation recognition, and budget allocations between project costs and power marketing costs. Green prices are higher than those for conventional sources, particularly prices from natural gas fired plants. Natural gas is abundant relative to oil in price per British thermal unit (Btu). Green pricing can help bridge the gap between the current oversupply of gas and the time, not far off, when all petroleum prices will exceed those for renewable energy. The rapid implementation of green pricing is important. New marketing programs will bolster the growing demand for renewable energy evidenced in many national surveys thus decreasing the consumption of power now generated by burning hydrocarbons. This paper sets forth a framework to implement a green power marketing plan for renewable energy developers and utilities working together

  10. Power production and energy consumption in Norway

    International Nuclear Information System (INIS)

    2001-03-01

    The main electrical resource of Norway comes from its rivers: 99% of the electric power is produced by hydroelectric power plants. Other sources, like wind and natural gas, are envisaged for the enhancement of Norway's energy production capacity. In this document, the part devoted to power production presents the different electricity production sources and their impact on the Norwegian economy. The energy consumption is detailed in the third part with an historical review of its evolution and a description of the main sectors involved in this consumption. The forth part describes the main actors of the energy sector with their industrial structure, the research institutes and universities performing R and D in this domain, and the energy trades with surrounding countries. The fifth part stresses on the research projects, on the government promoting actions through the Norwegian Research Council, and gives some examples of todays research projects. The sixth part deals with international cooperation in the R and D domain with a particular attention given to the relations between Norway, France and Europe. (J.S.)

  11. A stochastic MILP energy planning model incorporating power market dynamics

    International Nuclear Information System (INIS)

    Koltsaklis, Nikolaos E.; Nazos, Konstantinos

    2017-01-01

    Highlights: •Stochastic MILP model for the optimal energy planning of a power system. •Power market dynamics (offers/bids) are incorporated in the proposed model. •Monte Carlo method for capturing the uncertainty of some key parameters. •Analytical supply cost composition per power producer and activity. •Clean dark and spark spreads are calculated for each power unit. -- Abstract: This paper presents an optimization-based methodological approach to address the problem of the optimal planning of a power system at an annual level in competitive and uncertain power markets. More specifically, a stochastic mixed integer linear programming model (MILP) has been developed, combining advanced optimization techniques with Monte Carlo method in order to deal with uncertainty issues. The main focus of the proposed framework is the dynamic formulation of the strategy followed by all market participants in volatile market conditions, as well as detailed economic assessment of the power system’s operation. The applicability of the proposed approach has been tested on a real case study of the interconnected Greek power system, quantifying in detail all the relevant technical and economic aspects of the system’s operation. The proposed work identifies in the form of probability distributions the optimal power generation mix, electricity trade at a regional level, carbon footprint, as well as detailed total supply cost composition, according to the assumed market structure. The paper demonstrates that the proposed optimization approach is able to provide important insights into the appropriate energy strategies designed by market participants, as well as on the strategic long-term decisions to be made by investors and/or policy makers at a national and/or regional level, underscoring potential risks and providing appropriate price signals on critical energy projects under real market operating conditions.

  12. Long-Term Planning in Restructured Power Systems

    International Nuclear Information System (INIS)

    Botterud, Audun

    2003-01-01

    This thesis describes the development of three decision support models for long-term investment planning in restructured power systems. The model concepts address the changing conditions for the electric power industry, with the introduction of more competitive markets, higher uncertainty and less centralised planning. Under these circumstances there is an emerging need for new planning models, also for analyses of the power system in a long-term perspective. The thesis focuses particularly on how dynamic and stochastic modelling can contribute to the improvement of decision making in a restructured power industry. We argue that the use of such modelling approaches has become more important after the introduction of competitive power markets, due to the participants' increased exposure to price fluctuations and economic risk. Our models can be applied by individual participants in the power system to evaluate investment projects for new power generation capacity. The models can also serve as a decision support tool on a regulatory level, providing analyses of the long-term performance of the power system under different regulations and market designs. In Chapter 1, we give a brief introduction to the ongoing development towards restructuring and liberalisation of the electrical power system. A discussion of the operation and organisation of restructured power systems is also provided. In Chapter 2, we look more specifically at different modelling approaches for expansion planning in electrical power systems. We also discuss how the contributions in this thesis compare to previous work in the field of decision support models for long-term planning in both regulated and competitive power systems. In Chapter 3, we develop a power market simulation model based on system dynamics. The advantages and limitations of using descriptive system dynamics models for long-term planning purposes in this context are also discussed. Chapter 4 is devoted to a novel optimisation

  13. Production planning in the Combinado Lácteo Santiago

    Directory of Open Access Journals (Sweden)

    Edith Carmen Fajardo-Alcolea

    2017-12-01

    Full Text Available A planning, programming and control of the production procedure is designed in this paper to consider all the technical and organizational aspects that are involved in planning, using the balance and normative method, and a variant of the General Algorithm for the Calculation of the Capacities. This procedure is supported by an innovative computer application designed to assist students, technicians and specialists in the planning stages. The procedure is applied in the company “Combinado Lácteo de Santiago de Cuba” to plan the production in 2016. As a result, an innovation of an organizational type is obtained that allows the Production Master Plan, disaggregated in the different time horizons, consider the real capacity of the plants. For its evaluation it was compared to the production plan prepared by the company and the actual production data of the first quarter of the year to determine the existing differences.

  14. Product Family Modelling for Manufacturing Planning

    DEFF Research Database (Denmark)

    Jørgensen, Kaj Asbjørn; Petersen, Thomas Ditlev; Nielsen, Kjeld

    2011-01-01

    To enable product configuration of a product family, it is important to develop a model of the selected product family. From such a model, an often performed practice is to make a product configurator from which customers can specify individual products from the family. To get further utilisation...

  15. Sustainable power planning for the island of Crete

    International Nuclear Information System (INIS)

    Giatrakos, Georgios P.; Tsoutsos, Theocharis D.; Zografakis, Nikos

    2009-01-01

    Crete, as one of the largest and most touristic islands of the Mediterranean, is facing abrupt population and economic growth tendencies that result in the incessant problem of inability to meet power demand increase. This paper evaluates the island's present electrical energy status, and examines the possibility of further penetration of sustainable energy. Various energy modelling software solutions are examined and evaluated, in order to form scenarios according to the governmental and EU directives for renewable energy sources (RES), as well as to the planned conventional power plant upgrades and LNG transition. RES are fully exploited in the plan's scenarios, always taking into account all technical and legislative limitations. Analysis shows that even the most modest and realistic RES implementation scenarios, combined with a partially successful demand restriction, could indeed contract the island's environmental footprint. RES penetration in Crete's electric seems to be able to surpass 30% by 2020, surpassing even the optimistic EU targets for 20% RES by 2020

  16. Dungeness Power Station off-site emergency plan

    International Nuclear Information System (INIS)

    1993-01-01

    This off-site Emergency Plan in the event of an accidental release of radioactivity at the Dungeness Nuclear power station sets out the necessary management and coordination processes between Nuclear Electric, operators of the site, the emergency services and relevant local authorities. The objectives promoting the aim are identified and the activities which will be undertaken to protect the public and the environment in the event of an emergency are outlined. (UK)

  17. IMPROVEMENT OF PRODUCTION PLANNING IN COMPANY PARS KOMPONENTY

    Directory of Open Access Journals (Sweden)

    René Klega

    2014-03-01

    Full Text Available The article analyzes the current status of production planning in company Pars Komponenty s.r.o., proposes a new method of planning based on application of the principle of MRP. It is a discrete type of production with high complexity of BOM and MTO (Make-to-Order and ETO (Engineering-to-Order from the point of decoupling point. The original planning system plans according to production capacity backward without collisions, but for a given type of production does not work in practice. Planning system was analyzed and the main problems were identified, which were high work in progress and material stocks. This article target is to propose a new planining system based on the inclusion of time reserves of purchased material items. New planning system was tested in practise with benefit in reducing both the material inventory and work in progress.

  18. Production Planning with Load Dependent Lead Times

    DEFF Research Database (Denmark)

    Pahl, Julia

    2005-01-01

    Lead times impact the performance of the supply chain significantly. Although there is a large literature concerning queuing models for the analysis of the relationship between capacity utilization and lead times, and there is a substantial literature concerning control and order release policies...... that take lead times into consideration, there have been only few papers describing models at the aggregate planning level that recognize the relationship between the planned utilization of capacity and lead times. In this paper we provide an in-depth discussion of the state-of-the art in this literature......, with particular attention to those models that are appropriate at the aggregate planning level....

  19. Computerized planning system for nuclear power plant evaluation

    International Nuclear Information System (INIS)

    Bonczek, R.H.; Holsapple, C.W.; Whinston, A.B.

    1976-01-01

    A computerized system is described for information storage and query processing adapted to complex socio-technological issues. The system is referred to as GPLAN (Generalized Planning System) and can accommodate both qualitative (verbal) and quantitative data. The issue illustrated is the construction of a nuclear power plant, and involves interdisciplinary research and planning. The system's outstanding features are the use of the network variety of data base, the selective retrieval of any configuration of data from a particular network structure, automatic execution of any desired application program from a standard or special library of applications, user interface with a data base and applications by submitting English-like, non-procedural queries, and generality which allows tailoring to specific applications and provides a basis for integration of planning and research activities. The system is general and can be used for a wide variety of socio-technological issues which involve complex data relationships

  20. Forest management planning for timber production: a sequential approach

    Science.gov (United States)

    Krishna P. Rustagi

    1978-01-01

    Explicit forest management planning for timber production beyond the first few years at any time necessitates use of information which can best be described as suspect. The two-step approach outlined here concentrates on the planning strategy over the next few years without losing sight of the long-run productivity. Frequent updating of the long-range and short-range...

  1. Planning of emergency medical treatment in nuclear power plant

    International Nuclear Information System (INIS)

    Kusama, Tomoko

    1989-01-01

    Medical staffs and health physicists have shown deep concerning at the emergency plans of nuclear power plants after the TMI nuclear accident. The most important and basic countermeasure for accidents was preparing appropriate and concrete organization and plans for treatment. We have planed emergency medical treatment for radiation workers in a nuclear power plant institute. The emergency medical treatment at institute consisted of two stages, that is on-site emergency treatment at facility medical service. In first step of planning in each stage, we selected and treatment at facility medical service. In first step of planning in each stage, we selected and analyzed all possible accidents in the institute and discussed on practical treatments for some possible accidents. The manuals of concrete procedure of emergency treatment for some accidents were prepared following discussion and facilities and equipment for medical treatment and decontamination were provided. All workers in the institute had periodical training and drilling of on-site emergency treatment and mastered technique of first aid. Decontamination and operation rooms were provided in the facillity medical service. The main functions at the facility medical service have been carried out by industrial nurses. Industrial nurses have been in close co-operation with radiation safety officers and medical doctors in regional hospital. (author)

  2. Productivity and Performance through Marketing Planning

    Directory of Open Access Journals (Sweden)

    Cristian Morozan

    2008-11-01

    Full Text Available In the marketing area, planning might be defined as an anticipation process of those changes that affect the market and as an elaboration process of the corresponding action means. It will result in a marketing plan, which might be tactical (short-term period, spread on a period of time that might vary from six months to one year, or a strategic (long-term, spread on a period of time of three to ten years. Planning means building action programs in which the objectives, the set financing method or the steps of achieving it should be clearly defined. Marketing planning also proves to be important for its liaison between what the company can offer and the consumers’ needs and expectations.

  3. Guidance for emergency planning in nuclear power plants

    International Nuclear Information System (INIS)

    Magnusson, Tommy; Ekdahl, Maria

    2008-06-01

    Ringhals has been a model for this study, but the purpose has been to make the report applicable at all nuclear power plants in Sweden. The work has been done in close co-operation with the Swedish nuclear power plants and Rescue Services in the nuclear power municipalities Oesthammar, Oskarshamn, and Varberg. The internal fire brigade at the nuclear power plants has also been involved. A document will also be published as a further guidance at efforts of the type fires, which are mentioned in the enclosed document. After a fire in a switchgear room in 2005 the need of making the existing effort planning more effective at nuclear power plants was observed. The idea with the planning is to plan the effort in order to give the operational and emergency staff a good and actual support to come to a decision and to start the mission without delay. The risk information is showed by planning layouts, symbols and drawings as basis, give risk information and effort information. The effort information shows outer arrangements, manual action points, fire installations, passive fire safety etc. The risk information is shown by risk symbols. Their purpose is to give a fast overview of the existing risks. Reactor safety effects is the ruling influence if an effort has to be done in order to secure safety for a third person. In order to make an effort in an area personal risks for rescue staff, such as electricity risks, radiological risks, chemicals and gas bottles with compressed gases, has to be eliminated. For complicated missions detailed instructions are needed in order to handle specific risks. In a group discussion different people with pertinent knowledge has to value which problematic efforts need detailed instruction. Missions that have to be analyzed in a work group as above are: fire may affect the reactor safety, fire that may threaten the structural integrity, chemical discharge with big consequence on environment/third person and handling of gas system (compressed

  4. Planning and architectural safety considerations in designing nuclear power plants

    International Nuclear Information System (INIS)

    Konsowa, Ahmed A.

    2009-01-01

    To achieve optimum safety and to avoid possible hazards in nuclear power plants, considering architectural design fundamentals and all operating precautions is mandatory. There are some planning and architectural precautions should be considered to achieve a high quality design and construction of nuclear power plant with optimum safety. This paper highlights predicted hazards like fire, terrorism, aircraft crash attacks, adversaries, intruders, and earthquakes, proposing protective actions against these hazards that vary from preventing danger to evacuating and sheltering people in-place. For instance; using safeguards program to protect against sabotage, theft, and diversion. Also, site and building well design focusing on escape pathways, emergency exits, and evacuation zones, and the safety procedures such as; evacuation exercises and sheltering processes according to different emergency classifications. In addition, this paper mentions some important codes and regulations that control nuclear power plants design, and assessment methods that evaluate probable risks. (author)

  5. Production Planning and Planting Pattern Scheduling Information System for Horticulture

    Science.gov (United States)

    Vitadiar, Tanhella Zein; Farikhin; Surarso, Bayu

    2018-02-01

    This paper present the production of planning and planting pattern scheduling faced by horticulture farmer using two methods. Fuzzy time series method use to predict demand on based on sales amount, while linear programming is used to assist horticulture farmers in making production planning decisions and determining the schedule of cropping patterns in accordance with demand predictions of the fuzzy time series method, variable use in this paper is size of areas, production advantage, amount of seeds and age of the plants. This research result production planning and planting patterns scheduling information system with the output is recommendations planting schedule, harvest schedule and the number of seeds will be plant.

  6. Pulsed Power: Sandia's Plans for the New Millenium

    International Nuclear Information System (INIS)

    Quintenz, Jeffrey P.

    2000-01-01

    Pulsed power science and engineering activities at Sandia National Laboratories grew out of a programmatic need for intense radiation sources to advance capabilities in radiographic imaging and to create environments for testing and certifying the hardness of components and systems to radiation in hostile environments. By the early 1970s, scientists in laboratories around the world began utilizing pulsed power drivers with very short (10s of nanoseconds) pulse lengths for Inertial Confinement Fusion (ICF) experiments. In the United States, Defense Programs within the Department of Energy has sponsored this research. Recent progress in pulsed power, specifically fast-pulsed-power-driven z pinches, in creating temperatures relevant to ICF has been remarkable. Worldwide developments in pulsed power technologies and increased applications in both defense and industry are contrasted with ever increasing stress on research and development tiding. The current environment has prompted us at Sandia to evaluate our role in the continued development of pulsed power science and to consider options for the future. This presentation will highlight our recent progress and provide an overview of our plans as we begin the new millennium

  7. Torrefaction of biomass for power production

    DEFF Research Database (Denmark)

    Saleh, Suriyati Binti

    In order to increase the share of biomass for sustainable energy production, it will be an advantage to utilize fuels as straw, wood and waste on large suspension fired boilers. On a European scale, currently large straw resources are available that are not fully utilized for energy production...... rates, relatively low superheater temperatures have to be applied, which in turn lower the power efficiency. The idea for this Ph.D. project is to develop a biomass pretreatment method that could provide the heating value of the fuel for the boiler, but in a way such that the fuel is easily pulverized.......D. thesis focus on the following subjects: 1) the development of experimental procedures for a novel laboratory scale reactor (simultaneous torrefaction and grinding) and a study on the torrefaction of straw and wood; 2) study the influence of biomass chemical properties such as ash content, ash composition...

  8. Automobile Marketing Strategies, Pricing, and Product Planning

    Science.gov (United States)

    1978-04-01

    The objective of the study was to determine the decision-making processes concerning major model year product introductions and alterations in the automotive industry as well as to investigate techniques of price positioning, product and image positi...

  9. Automobile Marketing Strategies, Pricing, and Product Planning

    Science.gov (United States)

    1978-01-01

    The objective of the study was to determine the decision-making processes concerning major model year product introductions and alterations in the automotive industry as well as to investigate techniques of price positioning, product and image positi...

  10. Wind power planning: assessing long-term costs and benefits

    International Nuclear Information System (INIS)

    Kennedy, Scott

    2005-01-01

    In the following paper, a new and straightforward technique for estimating the social benefit of large-scale wind power production is presented. The social benefit is based upon wind power's energy and capacity services and the avoidance of environmental damages. The approach uses probabilistic load duration curves to account for the stochastic interaction between wind power availability, electricity demand, and conventional generator dispatch. The model is applied to potential offshore wind power development to the south of Long Island, NY. If natural gas combined cycle and integrated gasifier combined cycle (IGCC) are the alternative generation sources, wind power exhibits a negative social benefit due to its high capacity cost and the relatively low emissions of these advanced fossil-fuel technologies. Environmental benefits increase significantly if charges for CO 2 emissions are included. Results also reveal a diminishing social benefit as wind power penetration increases. The dependence of wind power benefits on CO 2 charges, and capital costs for wind turbines and IGCC plant is also discussed. The methodology is intended for use by energy planners in assessing the social benefit of future investments in wind power

  11. Possibilities and future of wind power production in Finland

    International Nuclear Information System (INIS)

    Holttinen, E.; Tammelin, B.

    1997-01-01

    The article was prepared for two presentations for Finnish MPs late autumn 1996 in connection of the handling of new energy taxation in Finland. The governmental proposal was going to favour the use of coal and unfavour the use of renewable energy sources. The total amount of installed wind power in Finland (7 MW) was compared to some other European countries. Anyhow it is well known that the wind potential in Finland due to its long coast line, large archipelago and great number of arctic mountains, all with very good wind climate, offers a great opportunity for effective exploitation of wind energy. The price of wind energy in Finland is 30 p/kWh (about 0,05 ECU) and it is estimated that with bigger power plan units it could be 20 p/kWh. Different ways to support wind energy production was presented with examples from Germany, Denmark and Sweden. (orig.) (8 refs.)

  12. Utilization of agricultural waste in power production

    Energy Technology Data Exchange (ETDEWEB)

    Clausen, J.C. [ELSAMPROJEKT A/S, Fredericia (Denmark); Rasmussen, I. [MIDTKRAFT Power Co., Aarhus (Denmark)

    1993-12-31

    It is a goal of the Danish energy policy for the last decade to reduce energy consumption and to introduce fuels for power production with less CO{sub 2} emission than coal. This measure has caused a considerable effort by the Danish utilities to develop technologies that reduce CO{sub 2} emissions without causing heavy cost increases of power. Agricultural waste in the form of surplus straw is available in an amount equivalent to 20% of the annual coal imports to Denmark. Straw firing is difficult due to its significant contents of alkaline components. Consequently, its utilization presupposes the development of new technologies. The biomass development program is concentrated on two ways which are (1) co-firing of existing coal fired power station with a modest amount of straw and (2) development of CFB technology that allows a high share of biomass as well as coal only. These options were tested in a coal fired 70 MW spreader stoker unit and a 125 MW PF unit. Approx. 4000 t of straw were burned. Additional tests will be launched this autumn, burning 35,000 t of straw at rates up to 20% straw. The CFB option is pursued from the platform of a 80 MWth unit, operational early `92. This plant burns a mix of 50% straw and 50% coal and consumes annually 70.000 t of straw. Future development is aiming towards CFBs of 250 MW(e), burning in excess of 50% biomass.

  13. Planning and management of outages in nuclear power plants

    International Nuclear Information System (INIS)

    Sica, G.F.; Fusari, W.; Reginelli, A.

    1984-01-01

    At present the Ente Nazionale per l'Energia Elettrica (ENEL) operates three nuclear power plants, only one of which belongs to the new generation, i.e. the Caorso Nuclear Power Plant which has been in commercial operation since December 1981. Outage planning, implementation and analysis are very important in order to minimize the shutdown time and thus improve plant availability, which is of particular importance for a large nuclear power plant. Such activities are very complicated because of the large number of jobs that have to be performed in accordance with detailed written procedures and which have to be properly documented and controlled. Large off-site resources are required which have to be accurately interfaced with on-site staff. The ENEL is making a great effort to define both the administrative and technical aspects of refuelling outages. As outage planning requires the availability and handling of a large amount of data and information, a maintenance information system that has been widely used in conventional plants was applied, with some modifications made especially for the Caorso Nuclear Power Plant. After two years the following results have been achieved: a large number of raw and processed data are now available, the first refuelling outage was carried out with few problems and according to schedule, and the second refuelling outage, based on the experience of the first, required somewhat less preparation and is developing well even though many special activities have had to be scheduled. The ENEL believes that the efforts made in the planning and management areas will pay off in terms of the short duration, smoothness and economy of further outages, both for Caorso and for future plants. (author)

  14. The sustainability indicators of power production systems

    Energy Technology Data Exchange (ETDEWEB)

    Onat, Nevzat [Vocational School of Technical Studies, Marmara University, Istanbul 34722 (Turkey); Bayar, Haydar [Technical Education Faculty, Marmara University, Istanbul 34722 (Turkey)

    2010-12-15

    One of the most important elements of economical and social development is to provide uninterrupted electric energy to consumers. The increasing world population and technological developments rapidly increase the demand on electric energy. In order to meet the increasing demand for sustainable development, it is necessary to use the consumable resources of the world in the most productive manner and minimum level and to keep its negative effects on human health and environment in the lowest level as much as possible. In this study, alignment of hydrogen fuel cells, hydroelectric, wind, solar and geothermal sourced electric energy systems, in addition to fossil fueled coal, natural gas and nuclear power plants, in respect to sustainability parameters such as CO{sub 2} emission, land use, energy output, fresh water consumption and environmental and social effects is researched. Consequently, it has been determined that the wind and nuclear energy power plants have the highest sustainability indicators. The fuel cells that use hydrogen obtained by using coal and natural gas are determined as the most disadvantageous transformation technologies in respect to sustainability. This study contains an alignment related to today's technologies. Using of renewable energy resources especially in production of hydrogen, output increases to be ensured with nanotechnology applications in photovoltaic systems may change this alignment. (author)

  15. Freezing the Master Production Schedule Under Rolling Planning Horizons

    OpenAIRE

    V. Sridharan; William L. Berry; V. Udayabhanu

    1987-01-01

    The stability of the Master Production Schedule (MPS) is a critical issue in managing production operations with a Material Requirements Planning System. One method of achieving stability is to freeze some portion or all of the MPS. While freezing the MPS can limit the number of schedule changes, it can also produce an increase in production and inventory costs. This paper examines three decision variables in freezing the MPS: the freezing method, the freeze interval length, and the planning ...

  16. Innovation Cycles Concerning Strategic Planning of Product-Service-Systems

    OpenAIRE

    Hepperle, Clemens;Mörtl, Markus;Lindemann, Udo

    2017-01-01

    This paper proposes a research program for identifying, understanding and describing innovation cycles concerning strategic planning of product-service-systems. A general overview about the background of cycle management in innovation processes, which the proposed research program is part of, is given before focusing cycles concerning strategic planning. As companies offer more and more complex products in order to satisfy market needs, the innovation process of such products becomes also mor...

  17. Nuclear power as an option in electrical generation planning for Croatia

    International Nuclear Information System (INIS)

    Feretic, D.; Tomsic, Z.; Cavlina, N.; Kovacevic, T.

    2000-01-01

    The expected increase of electricity consumption in the next two decades, if covered mainly by domestic production, will require roughly 4500 MW of new installed capacity. The question is which resource mix would be optimal for the future power plants. Taking into account lack of domestic resources for electricity generation, current trends in the European energy markets, and environmental impact of various energy technologies, it seems reasonable for Croatia to keep the nuclear option open in the future energy planning. In line with that conclusion, this paper analyzes how the introduction of nuclear power plants would influence future power system expansion plans in Croatia, and the possibility to meet the Kyoto requirement. The effects of CO 2 emission tax and external costs on the optimal capacity mix and the emissions levels are also examined. (author)

  18. A model for marketing planning for new products

    DEFF Research Database (Denmark)

    Martensen, Anne

    1993-01-01

    awareness model. The model can be used to generate improved marketing plans. In this connection, it is important that the model includes the marketing variables, for it is only in this way that the model can be used for marketing plan optimization. It is predicted that a future direction of development...... and use of sales forecasting models for new products will be within optimization of the marketing plan for launching a new product, and not only as a tool for forecasting sales for just one marketing plan....

  19. Analysis of the security during power system expansion planning

    Directory of Open Access Journals (Sweden)

    Osak Alexey

    2017-01-01

    Full Text Available Increasing the intelligent level of the EPS control systems, caused by the implementation of Smart technologies, changes the structure and the properties of EPS and increases the importance of system reliability analysis. System reliability analysis includes two components – for the balance and for the regime. On the one hand, there is a large number of studies to assess the reliability of the power system, which examines various aspects and methods of solving this problem. On the other hand, in Russia there is no generally accepted methodology with clear criteria that could be used for feasibility studies of various technical solutions taking into consideration system reliability aspects. In practice, the security analysis is limited by the calculations of power flows, static and dynamic stability for a number of forecast periods for the normal and repair circuits considering the most severe disturbances. The existing approach allows defining the requirements and adjusting emergency control systems, but does not allow evaluating and comparing solutions for power grid constructions. The authors propose a new method for power system reliability evaluation, which is suitable for planning development and operation of power systems. The method includes a general description of the algorithm which allows to compare various development scenarios, as well as to assess the reliability level of their implementation. In particular, the method allows to determine where it is needed only the relay protection and emergency control system development, and where it is necessary grid, protection and control development and reconstruction.

  20. Effect of economic parameters on power generation expansion planning

    International Nuclear Information System (INIS)

    Sevilgen, Sueleyman Hakan; Hueseyin Erdem, Hasan; Cetin, Burhanettin; Volkan Akkaya, Ali; Dagdas, Ahmet

    2005-01-01

    The increasing consumption of electricity within time forces countries to build additional power plants. Because of technical and economic differences of the additional power plants, economic methodologies are used to determine the best technology for the additional capacity. The annual levelized cost method is used for this purpose, and the technology giving the minimum value for the additional load range is chosen. However, the economic parameters such as interest rate, construction escalation, fuel escalation, maintenance escalation and discount factor can affect the annual levelized cost considerably and change the economic range of the plants. Determining the values of the economical parameters in the future is very difficult, especially in developing countries. For this reason, the analysis of the changing rates of the mentioned values is of great importance for the planners of the additional capacity. In this study, the changing rates of the economic parameters that influence the annual levelized cost of the alternative power plant types are discussed. The alternative power plants considered for the electricity generation sector of Turkey and the economic parameters dominating each plant type are determined. It is clearly seen that the annual levelized cost for additional power plants varies with the economic parameters. The results show that the economic parameters variation has to be taken into consideration in electricity generation planning

  1. The strategic economic plan and the role of independent power in economic development

    International Nuclear Information System (INIS)

    House, D.

    1993-01-01

    Independent power production (IPP) in Newfoundland was examined within the context of the province's Strategic Economic Plan. Provisions of the Plan were summarized, with special reference to the promotion of alternative energy technologies and government efforts to amend regulations to facilitate development of alternative energy sources by independent producers. IPP was considered to be an ideal tool for regional economic development and diversification, assuming that environmental concerns were carefully considered and addressed. Some of the benefits ascribed to IPP included strengthening the private sector, creating new small business opportunities, improving competitiveness, promoting regional development, contributing to import substitution and enhance the province's technology and knowledge base

  2. Results from the Macedonian power system development planning

    International Nuclear Information System (INIS)

    Volkanovski, A.; Bosevski, T.; Todorovski, M.

    2000-01-01

    In this paper we present the results from the development planning of the Macedonian power system for the period 2001-2020. Taking into account the fact that one can not consider construction of new power generating units on domestic lignite due to its shortage, development of the national power system can be supported by utilisation of hydro potential, natural gas within the capabilities of the existing gas pipeline and nuclear energy. The crucial year in the planning period will be the year when reduction of the lignite utilisation in the existing thermal plants will take place, which will cause construction of new units with significant capacities. We have analysed two possibilities for inclusion od nuclear plant, optimal based on the economical criteria and forced with delay of the on-line year of the nuclear plant starting from the optimal year for its construction (2014 which was obtained from the WASP optimisation procedure) and ending with the year 2021 (one year beyond the study period). (author)

  3. Planning stability in a product recorvery syste

    NARCIS (Netherlands)

    G. Heisig; M. Fleischmann (Moritz)

    2001-01-01

    textabstractRecovery of used products is an issue of growing importance due to customer expectations and environmental regulation. As a consequence, companies need to adapt their material management taking into account inbound flows of used products. Corresponding inventory control models have been

  4. Robust Optimization Model for Production Planning Problem under Uncertainty

    Directory of Open Access Journals (Sweden)

    Pembe GÜÇLÜ

    2017-01-01

    Full Text Available Conditions of businesses change very quickly. To take into account the uncertainty engendered by changes has become almost a rule while planning. Robust optimization techniques that are methods of handling uncertainty ensure to produce less sensitive results to changing conditions. Production planning, is to decide from which product, when and how much will be produced, with a most basic definition. Modeling and solution of the Production planning problems changes depending on structure of the production processes, parameters and variables. In this paper, it is aimed to generate and apply scenario based robust optimization model for capacitated two-stage multi-product production planning problem under parameter and demand uncertainty. With this purpose, production planning problem of a textile company that operate in İzmir has been modeled and solved, then deterministic scenarios’ and robust method’s results have been compared. Robust method has provided a production plan that has higher cost but, will result close to feasible and optimal for most of the different scenarios in the future.

  5. Probabilistic power generation planning with environmental consideration for Lebanon

    International Nuclear Information System (INIS)

    Karaki, S.H.; Chaaban, F.B.; Tarhini, K.A.

    2000-01-01

    Full text.This paper describes a software tool for generation expansion planning based on dynamic programming, probabilistic production simulation, and environmental assessment. The aim is to determine the units needed to expand a given system in order to minimize either the cost or the environmental impact or some weighed function of the two. The problem of generation expansion planning is solved in stages using Tunnel Dynamic Programming (TDP) with Heuristic rules to limit the number of options analyzed. The production costing methodology is based on combining a probabilistic generation model known as the capacity outage table (COT) with the load duration curve (LDC) of the system to deduce a risk model from which the expected energy not supplied (EENS) is estimated. The generation model is built recursively using an efficient numerical convolution procedure and is combined at each step with the LDC to calculate the expected energy produced by each unit, its corresponding production cost and related environmental emissions. The estimation of the air effluents is conducted based on the fuel type, the heat rate and teh energy produced by each unit. The program can model hydro-electric units as well as energy limited units, under economical and environmental load dispatches. The work is concluded by case studies to illustrate the capabilities of the model and to examine the impact of various technical, economic and environmental parameters on the proposed plans

  6. Production and Distribution Planning in District Heating Systems; Produktions- och distributionsplanering av fjaerrvaerme

    Energy Technology Data Exchange (ETDEWEB)

    Kvarnstroem, Johan; Dotzauer, Erik; Dahlquist, Erik

    2006-12-15

    To produce heat and power is costly. Therefore it is important for the district heating companies to plan and optimize the production. The aim with the present project is to find out how also the distribution of heat can be considered in the planning. The principal procedure is to first construct a prediction of the heat demand, and then, given the demand prediction, construct the production plan. Due to the complexity of the problem, the need for mathematical models is obvious. The report gives a survey introduction to production planning in district heating systems and presents a model for the purpose. The model is developed for one of the district heating systems in Stockholm owned by the energy company Fortum. Traditionally, models for production planning do not consider the distribution network. In such models, usually the methodology Mixed Integer Programming (MIP) is used. The report suggests how the distribution network can be modeled as a MIP; it shall be possible to link the network model to existing software that models the production plants as MIP. The model is developed in the programming language GAMS. Analysis and results are presented. The results show that the suggested plans vary depending on if the distribution network is considered or not. The report also suggests how a simple sensitivity analysis of the production plans can be performed. This is necessary since there are always uncertainties associated with weather- and load predictions.

  7. DISTRIBUTED ELECTRICAL POWER PRODUCTION SYSTEM AND METHOD OF CONTROL THEREOF

    DEFF Research Database (Denmark)

    2010-01-01

    The present invention relates to a distributed electrical power production system wherein two or more electrical power units comprise respective sets of power supply attributes. Each set of power supply attributes is associated with a dynamic operating state of a particular electrical power unit....

  8. Application of reliability worth concepts in power system operational planning

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Silva, A.M. Leite da [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Pereira, M V.F. [Power System Research (PSR), Inc., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This work describes the application of a new methodology for calculating total system interruption costs in power system operational planning. Some important operational aspects are discussed: chronological load curves, customer damage functions for each consumer class, maintenance scheduling and non-exponential repair times. It is also presented the calculation of the probability distribution of the system interruption cost to improve the decision making process associated with alternative operational strategies. The Brazilian Southeastern system is used to illustrate all previous applications. (author) 24 refs., 8 figs., 4 tabs.

  9. Diffusion of green power products in Switzerland

    International Nuclear Information System (INIS)

    Wuestenhagen, Rolf; Markard, Jochen; Truffer, Bernhard

    2003-01-01

    As in many other European countries, green electricity is an emerging product in Switzerland as well. Although the market is yet to be liberalised, more than 100 of the 1200 Swiss electric utilities offer some sort of green electricity product to their customers. Successful companies like the municipal utilities of the cities of Zurich and Berne have reached customer response rates of up to 4%, while still maintaining cost-based pricing, i.e. charging their customers price premiums of 400-700% per kWh. While most of the products still rely on mainly photovoltaics, some utilities have started to introduce mixed green electricity products also including wind power. With a share of 60% in the Swiss generation mix, hydropower's role in the green electricity mix was also an issue to emerge causing controversial debate. While being renewable, hydropower is not considered environmentally benign by all the stakeholders, and unlike new renewables (solar, wind, biomass), there is little room for new hydropower generation facilities in Switzerland. The green electricity labelling scheme 'Naturemade' tackles that issue. The labelling organisation has evolved from a process with broad stakeholder involvement, which included environmental NGOs, scientific institutions, green electricity providers, renewable energy advocates, government bodies and consumer organisations. The analysis in this paper is based on a diffusion theory framework. It identifies and characterises different phases of (past and future) market development, and stresses the importance of eco-labelling as a tool to facilitate the transition from niche to mass market. Finally, we also discuss conclusions that can be drawn from the Swiss case towards market development and labelling on a European level

  10. Case study : power distribution PBR plans of National Grid USA

    International Nuclear Information System (INIS)

    Hill, T.

    2001-01-01

    This power point presentation described the progressive approach taken by the Northeastern United States towards electric power restructuring and performance based ratemaking (PBR) with reference to National Grid USA and the NEES tradition of pursuing regulatory matters. The catalyst for change was the NEES acquisition of EUA (and National Grid USA acquisition of NEES). Another catalyst for change was the desire to merge operating companies and consolidate rates. This paper described the settlement negotiations of the New England Process with reference to meeting the customer's desire for lower electricity prices and rate stability.The paper also described a multi-year PBR-based plan proposed for Niagara Mohawk which offers incentives for both cost efficiency and service quality. It was concluded that PBR is a sound basis for optimizing customer and shareholder benefits. It was emphasized that while PBR has universal application, detailed implementation must be sensitive to local issues and priorities. tabs., figs

  11. Cobalt-60 production in CANDU power reactors

    International Nuclear Information System (INIS)

    Slack, J.; Norton, J.L.; Malkoske, G.R.

    2003-01-01

    therapy machines. Today the majority of the cancer therapy cobalt-60 sources used in the world are manufactured using material from the NRU reactor in Chalk River. The same technology that was used for producing cobalt-60 in a research reactor was then adapted and transferred for use in a CANDU power reactor. In the early 1970s, in co-operation with Ontario Power Generation (formerly Ontario Hydro), bulk cobalt-60 production was initiated in the four Pickering A CANDU reactors located east of Toronto. This was the first full scale production of millions of curies of cobalt-60 per year. As the demand and acceptance of sterilization of medical products grew, MDS Nordion expanded its bulk supply by installing the proprietary Canadian technology in additional CANDUs. Over the years MDS Nordion has partnered with CANDU reactor owners to produce cobalt-60 at various sites. CANDU reactors that have, or are still producing cobalt-60, include Pickering A, Pickering B, Gentilly 2, Embalse in Argentina, and Bruce B. In conclusion, the technology for cobalt-60 production in CANDU reactors, designed and developed by MDS Nordion and Atomic Energy of Canada, has been safely, economically and successfully employed in CANDU reactors with over 195 reactor years of production. Today over forty percent of the world's disposable medical supplies are made safer through sterilization using cobalt-60 sources from MDS Nordion. Over the past 40 years, MDS Nordion with its CANDU reactor owner partners, has safely and reliably shipped more than 500 million curies of cobalt-60 sources to customers around the world. MDS Nordion is presently adding three more CANDU power reactors to its supply chain. These three additional cobalt producing CANDU's will help supplement the ability of the health care industry to provide safe, sterile, medical disposable products to people around the world. As new applications for cobalt-60 are identified, and the demand for bulk cobalt-60 increases, MDS Nordion and AECL

  12. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  13. Plans for industrial production of the SSC magnets

    International Nuclear Information System (INIS)

    Karpenko, V.N.; Rardin, D.C.

    1986-01-01

    The Universities Research Association through its Central Design Group is currently conducting research and development for the Department of Energy on a superconducting super collider (SSC). The proposed SSC is a device in which protons would be accelerated around a ring approximately 50 miles in circumference. The protons would be kept in their path by means of thousands of powerful superconducting magnets. Two such rings of magnets would be housed in a common underground tunnel, allowing groups of protons to be accelerated in opposite directions and collided, in order to study the fundamental nature of matter and energy. The magnet system is a major element of the SSC in terms of technical requirements, quantity of components and cost. In order to meet technical and production requirements imposed by this system early participation of industry is necessary. The program plans were developed with the objective to involve industry in the early stages of research and development of superconducting magnets, leading to cost effective processes of potential mass production of high quality accelerator magnets by industry. While a decision has not been made by the Department of Energy on whether or not to request construction of the SSC project, if such a request is made and the project is authorized and funded, it would lead to industrial manufacture of a large quantity of superconducting magnets

  14. The management plan preparation activities nuclear power plant in Indonesia

    International Nuclear Information System (INIS)

    Utomo

    2011-01-01

    A feasibility Study that has been updated show that two nuclear power units with each unit of power up to 1000 MWe can represent decently an economical alternative energy supply. It added that the available time schedule was quite tight so that the preparation for the development must be starting first. This paper will discuss the preparation of plans of the first nuclear power plant which includes program activities, the structure of contracts, schedules of activities and funding. From the information obtained to date that in addition to a candidate site that is ready to be built in Muria peninsula is still required another potential alternative site besides to search other complete data information. This site investigation activities completed within the time schedule was passed ''critical path'', so that these activities should be carried out intensively and obey the time. This paper describes the steps that need to be prepared to welcome the first nuclear power plant, after reviewing the various input above and apply the reality in Indonesia as the initial conditions. (author)

  15. Effects of parallel planning on agreement production.

    Science.gov (United States)

    Veenstra, Alma; Meyer, Antje S; Acheson, Daniel J

    2015-11-01

    An important issue in current psycholinguistics is how the time course of utterance planning affects the generation of grammatical structures. The current study investigated the influence of parallel activation of the components of complex noun phrases on the generation of subject-verb agreement. Specifically, the lexical interference account (Gillespie & Pearlmutter, 2011b; Solomon & Pearlmutter, 2004) predicts more agreement errors (i.e., attraction) for subject phrases in which the head and local noun mismatch in number (e.g., the apple next to the pears) when nouns are planned in parallel than when they are planned in sequence. We used a speeded picture description task that yielded sentences such as the apple next to the pears is red. The objects mentioned in the noun phrase were either semantically related or unrelated. To induce agreement errors, pictures sometimes mismatched in number. In order to manipulate the likelihood of parallel processing of the objects and to test the hypothesized relationship between parallel processing and the rate of agreement errors, the pictures were either placed close together or far apart. Analyses of the participants' eye movements and speech onset latencies indicated slower processing of the first object and stronger interference from the related (compared to the unrelated) second object in the close than in the far condition. Analyses of the agreement errors yielded an attraction effect, with more errors in mismatching than in matching conditions. However, the magnitude of the attraction effect did not differ across the close and far conditions. Thus, spatial proximity encouraged parallel processing of the pictures, which led to interference of the associated conceptual and/or lexical representation, but, contrary to the prediction, it did not lead to more attraction errors. Copyright © 2015 Elsevier B.V. All rights reserved.

  16. A continuous-time control model on production planning network ...

    African Journals Online (AJOL)

    A continuous-time control model on production planning network. DEA Omorogbe, MIU Okunsebor. Abstract. In this paper, we give a slightly detailed review of Graves and Hollywood model on constant inventory tactical planning model for a job shop. The limitations of this model are pointed out and a continuous time ...

  17. Preliminar plan of a machine for the synchrotron radiation production

    International Nuclear Information System (INIS)

    Moscati, G.; Takahashi, J.; Miyao, Y.

    1985-01-01

    A preliminar plan, with all the technical specifications, for the construction of a machine for the synchrotron radiation production to be done by the National Synchrotron Radiation Laboratory in Brazil is presented. (L.C.) [pt

  18. Application of PIMS Software in Monthly Planning of Refinery Production

    Institute of Scientific and Technical Information of China (English)

    2005-01-01

    This article describes the application of the PIMS software in formulating monthly refining production plan. Application of the PIMS software can help to solve a series of problems related with monthly plan of refining production such as optimized selection of crude and feedstocks, optimized selection of production scale and processing scheme, identification of bottlenecks and their mitigation,optimized selection of turnaround time and optimized selection of operating regime, which have increased the economic benefits of refining enterprises. With the further development and improvement of models the PIMS software will play an increasingly important role in formulating monthly plans of refining operations and production management at refineries. This article also explores the problems existing in refinery monthly planning, and has made recommendations on developing and improving models and reporting system, enhancement of basic data acquisition, model maintenance personnel and staff training.

  19. Integrated production planning and water management in the food industry: A cheese production case study

    NARCIS (Netherlands)

    Pulluru, Sai Jishna; Akkerman, Renzo; Hottenrott, Andreas

    2017-01-01

    Efficient water management is increasingly relevant in the food industry. Exploiting water reuse opportunities in planning production activities is a key part of this. We study integrated water management and production planning in cheese production. For this, we develop a water-integrated lot

  20. The SPES High Power ISOL production target

    Science.gov (United States)

    Andrighetto, A.; Corradetti, S.; Ballan, M.; Borgna, F.; Manzolaro, M.; Scarpa, D.; Monetti, A.; Rossignoli, M.; Silingardi, R.; Mozzi, A.; Vivian, G.; Boratto, E.; De Ruvo, L.; Sattin, N.; Meneghetti, G.; Oboe, R.; Guerzoni, M.; Margotti, A.; Ferrari, M.; Zenoni, A.; Prete, G.

    2016-11-01

    SPES (Selective Production of Exotic Species) is a facility under construction at INFN-LNL (Istituto Nazionale di Fisica Nucleare - Laboratori Nazionali di Legnaro), aimed to produce intense neutron-rich radioactive ion beams (RIBs). These will be obtained using the ISOL (Isotope Separation On-Line) method, bombarding a uranium carbide target with a proton beam of 40MeV energy and currents up to 200μA. The target configuration was designed to obtain a high number of fissions, up to 1013 per second, low power deposition and fast release of the produced isotopes. The exotic isotopes generated in the target are ionized, mass separated and re-accelerated by the ALPI superconducting LINAC at energies of 10AMeV and higher, for masses in the region of A = 130 amu , with an expected rate on the secondary target up to 109 particles per second. In this work, recent results on the R&D activities regarding the SPES RIB production target-ion source system are reported.

  1. Process planning and accuracy distribution of marine power plant modularization

    Directory of Open Access Journals (Sweden)

    ZHANG Jinguo

    2018-02-01

    Full Text Available [Objectives] Modular shipbuilding can shorten the cycle of design and construction, lower production costs and improve the quality of products, but higher shipbuilding capabilities are required, especially for the installation of power plants. Because of such characteristics of modular shipbuilding as the high precision of docking links, long size equipment installation chain and quantitative docking interfaces, docking installation is very difficult due to high docking deviation and low accuracy of docking installation, leading to the abnormal vibration of equipment. In order to solve this problem, [Methods] on the basis of domestic shipbuilding capability, numerical calculation methods are used to analyze the accuracy distribution of modular installation. [Results] The results show that the accuracy distribution of different docking links is reasonable and feasible, and the setting of adjusting allowance matches the requirements of shipbuilding. [Conclusions] This method provides a reference for the modular construction of marine power plants.

  2. Integrating Photovoltaic Systems in Power System: Power Quality Impacts and Optimal Planning Challenges

    Directory of Open Access Journals (Sweden)

    Aida Fazliana Abdul Kadir

    2014-01-01

    Full Text Available This paper is an overview of some of the main issues in photovoltaic based distributed generation (PVDG. A discussion of the harmonic distortion produced by PVDG units is presented. The maximum permissible penetration level of PVDG in distribution system is also considered. The general procedures of optimal planning for PVDG placement and sizing are also explained in this paper. The result of this review shows that there are different challenges for integrating PVDG in the power systems. One of these challenges is integrated system reliability whereas the amount of power produced by renewable energy source is consistent. Thus, the high penetration of PVDG into grid can decrease the reliability of the power system network. On the other hand, power quality is considered one of the challenges of PVDG whereas the high penetration of PVDGs can lead to more harmonic propagation into the power system network. In addition to that, voltage fluctuation of the integrated PVDG and reverse power flow are two important challenges to this technology. Finally, protection of power system with integrated PVDG is one of the most critical challenges to this technology as the current protection schemes are designed for unidirectional not bidirectional power flow pattern.

  3. Multi-product dynamic advertisement planning in a segmented market

    Directory of Open Access Journals (Sweden)

    Aggarwal Sugandha

    2017-01-01

    Full Text Available In this paper, a dynamic multi-objective linear integer programming model is proposed to optimally distribute a firm’s advertising budget among multiple products and media in a segmented market. To make the media plan responsive to the changes in the market, the distribution is carried out dynamically by dividing the planning horizon into smaller periods. The model incorporates the effect of the previous period advertising reach on the current period (taken through retention factor, and it also considers cross-product effect of simultaneously advertising different products. An application of the model is presented for an insurance firm that markets five different products, using goal programming approach.

  4. Energy and nuclear power planning in developing countries

    International Nuclear Information System (INIS)

    1985-01-01

    In this publication of the IAEA, after the introduction, four substantive parts follow. Part I, Energy demand and rational energy supply, deals with the needs for energy, primary energy resources and reserves, energy transport, storage, distribution and conservation, including the environmental effects on energy development. Part II, Economic aspects of energy development, presents an integrated view of the basic concepts of energy economics, evaluation of alternative energy projects with an in-depth comparison of electricity generation costs of nuclear and fossil-fuelled power plants. Part III, World energy development status and trends, begins with an overview of the world energy status and trends and continues with a presentation of the energy situation in industrialized countries and in developing countries. Part IV, Energy planning, deals with the optimization techniques, energy planning concepts and computerized models. The launching conditions and implementation of a nuclear power programme are described in detail. 582 references are given in the text and a bibliographical list of 356 titles has been added

  5. Interface between the production plan and the master production schedule in assembly environments

    OpenAIRE

    Moya Navarro, Marcos; Sánchez Brenes, Magaly

    2012-01-01

    In a production environment there is a direct relationship between the market and the manufacturing process of goods.When production is immersed in an assembly environment, the process of production planning and scheduling becomes complex, and the enterprises have the risk of losing competitive advantages in terms of not meeting delivery dates and production high costs. Linear programming has become an appropriate tool for production planning and scheduling in complex manufacturing environmen...

  6. Wind power planning in France (Aveyron), from State regulation to local planning

    Energy Technology Data Exchange (ETDEWEB)

    Nadai, Alain [CIRED - Centre Int. de Recherche sur l' Environnement et le Developpement (France); Labussiere, Olivier [Univ. de Pau et des Pays de l' Adour, Laboratoire Societe Environnement Territoire (France)

    2007-07-01

    Since a few years, French wind power has undertaken an unprecedented development. Few turbines are in place (756 MW), but the overall granted capacity amounts to about 2.7 GW. The administrative territory of Aveyron, one of the best wind power potential in the Country, is an interesting case for understanding the ways in which industrial wind power is being developed and regulated in France. The paper presents Aveyron wind power development by dividing it into three periods. For each period, we also sketch national developments in wind power policy.Between 1996 and 2000, Aveyron was one of the few places selected for developing wind parks under the French 'Eole 2005' call for tender. Between 2000 and 2005, French regulation shifted to fixed tariffs for small wind parks (less than 12 MW). The lack of planning approach provided developers with a window for profits. Numerous projects of small parks were submitted for development authorisation, overflowing the local administration. During the year of 2003, a new law on urbanism provided some rules for individual project developments without answering the key issue of territorial planning. In Aveyron, a local scheme devised by the decentralized branches of the State had a limited reach due to the lack of mandatory status and concentration.In July 2005, a new Energy Law imposed the design of Wind Power Development Zones (WPDZ) as a condition for tariff benefit (starting July 2007). WPDZ appeared to local actors as a promising tool but it came late. Many projects were already granted with construction permits.

  7. Presentation plan of the reconstruction and upgrade hydroelectric power plant 'Zvornik'

    Directory of Open Access Journals (Sweden)

    Krstić Dušan B.

    2016-01-01

    Full Text Available By the basic project of the energy utilization of the middle part of the river Drina (from Višegrad to Zvornik building of five large hydroelectric power plants was planned. Hydroelectric power plant near Zvornik had the greatest advantage, and it is the first built. Hydroelectric power plant 'Zvornik' separates the river Drina, about 1 km upstream from Mali Zvornik in Serbia and Zvornik in Bosnia and Herzegovina. In order to extend the work life, by the urban development project was planned modernization of production aggregates and associated equipment, the upgrade of annexes above the aggregate siphons A1 and A2, as well as the upgrade of the annexes of the powerhouse on the right bank of the river in the function of accommodation of electrical equipment. By replacing of the vital parts of turbines with increasing diameter with an increase of efficiency, Bow and power, as well as replacing generators with new generator of higher power with excitation and all the necessary auxiliary equipment, will ensure reliable operation of the hydroelectric power plant and will extend the working life of the next 40 years, creating opportunities for retrofitting additional fifth unit.

  8. Engineering and planning for decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Gans, G.M. Jr.

    1982-01-01

    With the publication of NUREG-0586, ''Draft Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities'' in January, 1981 the Nuclear Regulatory Commission staff has put the industry on notice that the termination of operating licenses and the final disposal of physical facilities will require the early consideration of several options and approaches and the preparation of comprehensive engineering and planning documents for the selected option at the end of useful life. This paper opens with a discussion of the options available and the principal aspects of decommissioning. The major emphasis of the composition is the nature of documents, the general approach to be followed, and special considerations to be taken into account when performing the detailed engineering and planning for decommissioning, as the end of life approaches and actual physical disposal is imminent. The author's main point of reference is on-going work by Burns and Roe, with Nuclear Energy Services, under contract to the Department of Energy's Richland Office, to perform the engineering and planning for the decommissioning of the Shippingport Atomic Power Station in Pennsylvania

  9. Strategic wind power trading considering rival wind power production

    DEFF Research Database (Denmark)

    Exizidis, Lazaros; Kazempour, Jalal; Pinson, Pierre

    2016-01-01

    In an electricity market with high share of wind power, it is expected that wind power producers may exercise market power. However, wind producers have to cope with wind’s uncertain nature in order to optimally offer their generation, whereas in a market with more than one wind producers, uncert...... depending on the rival’s wind generation, given that its own expected generation is not high. Finally, as anticipated, expected system cost is higher when both wind power producers are expected to have low wind power generation......In an electricity market with high share of wind power, it is expected that wind power producers may exercise market power. However, wind producers have to cope with wind’s uncertain nature in order to optimally offer their generation, whereas in a market with more than one wind producers......, uncertainty of rival wind power generation should also be considered. Under this context, this paper addresses the impact of rival wind producers on the offering strategy and profits of a pricemaker wind producer. A stochastic day-ahead market setup is considered, which optimizes the day-ahead schedules...

  10. Medium range production planning of "Tacer" company: a case study

    OpenAIRE

    Süer, Burak

    1994-01-01

    Ankara : Department of Management and the Graduate School of Business Administration of Bilkent University, 1994. Thesis (Master's) -- Bilkent University, 1994 Includes bibliographical references. In order to foresee the potential problems related with production, a production plan is undertaken for the year 1994. Product classification is determined according to the annual sales volume of the company "Tacer". A production schedule is prepared in relation with the forecast d...

  11. The nuclear industry's plan to achieve new nuclear power plant orders in the 1990's

    International Nuclear Information System (INIS)

    Bayne, P.

    1993-01-01

    Since the Arab Oil Embargo of 1973, there has been a direct relationship between the growth in the Gross Domestic Product and the growth in the use of electricity in the United States. That close relationship between economic growth and electricity will continue. If that is true, the United States Department of Energy says this country will need between 190,000 to 275,000 megawatts of new generating capacity in the next 20 years. Electricity is one of the cleanest and most efficient uses of energy. Of all the ways to generate electricity, nuclear power plants are the cleanest, producing no air pollution and no greenhouse gases. To help supply the needed increase in electricity generating capacity, the US nuclear power industry has developed a Strategic Plan for Building New Nuclear Power Plants. The plan identified fourteen issues which must be dealt with to create the conditions under which utilities could place orders for new nuclear plants by the mid-1990's. The plan was published in November of 1990 and significant progress has been made on most of the fourteen issues. The plan and progress made are reviewed in depth

  12. Maintenance planning for a deteriorating production process

    International Nuclear Information System (INIS)

    Ahmadi, Reza; Fouladirad, Mitra

    2017-01-01

    We consider a system subject to degradation, more precisely a production process with three quality states evolving according to a homogeneous Markov process. The degradation decreases the income generated by the system. To maintain revenue stream and prevent the loss of revenue, the system is inspected according to a Markov-modulated Poisson process. It is assumed that each inspection at time t incurs a time dependent cost. Each inspection improves the system health and therefore the degradation level jumps to a less deteriorated state. In absence of inspections, the system state is prone to shift to a more deteriorated state with a constant rate. The problem is to determine an optimal operating (stopping) time which truly balances some flow of income and increasing costs due to inspections, and so maximizes the expected gain of the proposed policy. To demonstrate the applicability of the explored approach and its effectiveness, some numerical results are provided. - Highlights: • An integrated model based on a quality state-dependent reward structure is explored. • The model allows the revenue stream responds to variation in the quality state. • The production process is inspected according to a Markovmodulated Poisson process. • Assuming a Markovian structure, we predict the quality state behavior. • We determine an optimal production run length based on a stopping decision rule.

  13. Energy-Performance as a driver for optimal production planning

    International Nuclear Information System (INIS)

    Salahi, Niloofar; Jafari, Mohsen A.

    2016-01-01

    Highlights: • A 2-dimensional Energy-Performance measure is proposed for energy aware production. • This is a novel approach integrates energy efficiency with production requirements. • This approach simultaneously incorporates machine and process related specifications. • The problem is solved as stochastic MILP with constraints addressing risk averseness. • The optimization is illustrated for 2 cases of single and serial machining operation. • Impact of various electricity pricing schemes on proposed production plan is analyzed. - Abstract: In this paper, we present energy-aware production planning using a two-dimensional “Energy-Performance” measure. With this measure, the production plan explicitly takes into account machine-level requirements, process control strategies, product types and demand patterns. The “Energy-Performance” measure is developed based on an existing concept, namely, “Specific Energy” at machine level. It is further expanded to an “Energy-Performance” profile for a production line. A production planning problem is formulated as a stochastic MILP with risk-averse constraints to account for manufacturer’s risk averseness. The objective is to attain an optimal production plan that minimizes the total loss distribution subject to system throughput targets, probabilistic risk constraints and constraints imposed by the underlying “Energy-Performance” pattern. Electricity price and demand per unit time are assumed to be stochastic. Conditional Value at Risk (CVaR) of loss distributions is used as the manufacturer’s risk measure. Both single-machine and production lines are studied for different profiles and electricity pricing schemes. It is shown that the shape of “Energy-Performance” profile can change optimal plans.

  14. Production planning of a perishable product with lead time and non-stationary demand

    NARCIS (Netherlands)

    Pauls-Worm, K.G.J.; Haijema, R.; Hendrix, E.M.T.; Rossi, R.; Vorst, van der J.G.A.J.

    2012-01-01

    We study a production planning problem for a perishable product with a fixed lifetime, under a service-level constraint. The product has a non-stationary stochastic demand. Food supply chains of fresh products like cheese and several crop products, are characterised by long lead times due to

  15. Shippingport Atomic Power Station Operating Experience, Developments and Future Plans

    International Nuclear Information System (INIS)

    Feinroth, H.; Oldham, G.M.; Stiefel, J.T.

    1963-01-01

    This paper describes and evaluates five years of operation and test of the Shippingport Atomic Power Station and discusses the current technical developments and future plans of the Shippingport programme. This programme is directed towards development of the basic technology of light-water reactors to provide the basis for potential reduction in the costs of nuclear power. The Shippingport reactor plant has operated for over five years and has been found to integrate readily into a utility system either as a base load or peak load unit. Plant component performance has been reliable. There have been no problems in contamination or waste disposal. Access to primary coolant components for maintenance has been good, demonstrating the integrity of fuel elements. Each of the three refuelling operations performed since start-up of Shippingport has required successively less time to accomplish. Recently, the third seed was refuelled in 32 working days, about one quarter the time required for the first refuelling. The formal requirements of personnel training, written administrative procedures, power plant manuals, etc., which have been a vital factor in the successful implementation of the Shippingport programme, are described. The results obtained from the comprehensive test programme carried out at Shippingport are compared with calculations, and good agreement has been obtained. Reactor core performance, plant stability, and response to load changes, fuel element and control rod performance, long-term effects such as corrosion and radiation level build-up, component performance, etc., are discussed in this paper. The principal objective of the current and future programmes of the Shippingport Project in advancing the basic technology of water-cooled reactors is discussed. This programme includes the continued operation of the Shippingport plant, and the development, design, manufacture and test operation of a long-life, highpower density second core - Core 2. At its

  16. Towards an integration of process planning and production planning and control for flexible manufacturing systems

    NARCIS (Netherlands)

    Gaalman, GJC; Slomp, J; Suresh, NC

    This introduction article attempts to present some major issues relating to the integration of process planning and production planning and control (PPC) for flexible manufacturing systems (FMSs). It shows that the performance of an FMS can be significantly improved and FMS capabilities more

  17. Empirical Information Metrics for Prediction Power and Experiment Planning

    Directory of Open Access Journals (Sweden)

    Christopher Lee

    2011-01-01

    Full Text Available In principle, information theory could provide useful metrics for statistical inference. In practice this is impeded by divergent assumptions: Information theory assumes the joint distribution of variables of interest is known, whereas in statistical inference it is hidden and is the goal of inference. To integrate these approaches we note a common theme they share, namely the measurement of prediction power. We generalize this concept as an information metric, subject to several requirements: Calculation of the metric must be objective or model-free; unbiased; convergent; probabilistically bounded; and low in computational complexity. Unfortunately, widely used model selection metrics such as Maximum Likelihood, the Akaike Information Criterion and Bayesian Information Criterion do not necessarily meet all these requirements. We define four distinct empirical information metrics measured via sampling, with explicit Law of Large Numbers convergence guarantees, which meet these requirements: Ie, the empirical information, a measure of average prediction power; Ib, the overfitting bias information, which measures selection bias in the modeling procedure; Ip, the potential information, which measures the total remaining information in the observations not yet discovered by the model; and Im, the model information, which measures the model’s extrapolation prediction power. Finally, we show that Ip + Ie, Ip + Im, and Ie — Im are fixed constants for a given observed dataset (i.e. prediction target, independent of the model, and thus represent a fundamental subdivision of the total information contained in the observations. We discuss the application of these metrics to modeling and experiment planning.    

  18. Power plans seek funds [in Indo-China

    International Nuclear Information System (INIS)

    Dansie, J.

    1995-01-01

    A conference in Vietnam on the Power Sector in Indochina and Myanmar in September 1995 is reported. The current power scenario in Vietnam and future government hopes and plans were outlined. In 1994 Vietnam had a total installed capacity of 4470 MW, of which 63% was hydropower. By 2010 it is hoped to increase total capacity to 18,000 MW with the hydropower contribution reduced to 50%. It is hoped to attract the US$20bn required to finance this development from investment by international organizations and private operators. However, problems exist in the form of uncertainties in Vietnamese law with respect to foreign investment and Vietnam's non-convertible currency. Vietnam is keen to attract hard currency but reluctant to let it out of the country as foreign companies would wish to do with their profits. Myanmar has been further to go than Vietnam in developing its huge hydropower resources to meet growing demand for electric power. About 40% of the country's peak demand of 550 MW is generated by hydropower but this represents only 1% of the total hydropower resource. Demand is expected to rise to 1500 MW by 2000. Again foreign investment is being sought. As in Vietnam, though, the question of an inconvertible currency arises. In addition, the subsidised low tariff in Myanmar promises only a low rate of return and the country is fighting high inflation. (U.K.)

  19. Production planning and coronal stop deletion in spontaneous speech

    Directory of Open Access Journals (Sweden)

    James Tanner

    2017-06-01

    Full Text Available Many phonological processes can be affected by segmental context spanning word boundaries, which often lead to variable outcomes. This paper tests the idea that some of this variability can be explained by reference to production planning. We examine coronal stop deletion (CSD, a variable process conditioned by preceding and upcoming phonological context, in a corpus of spontaneous British English speech, as a means of investigating a number of variables associated with planning: Prosodic boundary strength, word frequency, conditional probability of the following word, and speech rate. From the perspective of production planning, (1 prosodic boundaries should affect deletion rate independently of following context; (2 given the locality of production planning, the effect of the following context should decrease at stronger prosodic boundaries; and (3 other factors affecting planning scope should modulate the effect of upcoming phonological material above and beyond the modulating effect of prosodic boundaries. We build a statistical model of CSD realization, using pause length as a quantitative proxy for boundary strength, and find support for these predictions. These findings are compatible with the hypothesis that the locality of production planning constrains variability in speech production, and have practical implications for work on CSD and other variable processes.

  20. Modeling and forecasting of electrical power demands for capacity planning

    International Nuclear Information System (INIS)

    Al-Shobaki, S.; Mohsen, M.

    2007-01-01

    Jordan imports oil from neighboring countries for use in power production. As such, the cost of electricity production is high compared to oil producing countries. It is anticipated that Jordan will face major challenges in trying to meet the growing energy and electricity demands while also developing the energy sector in a way that reduces any adverse impacts on the economy, the environment and social life. This paper described the development of forecasting models to predict future generation and sales loads of electrical power in Jordan. Two models that could be used for the prediction of electrical energy demand in Amman, Jordan were developed and validated. An analysis of the data was also presented. The first model was based on the levels of energy generated by the National Electric Power Company (NEPCO) and the other was based on the levels of energy sold by the company in the same area. The models were compared and the percent error was presented. Energy demand was also forecasted across the next 60 months for both models. Results were then compared with the output of the in-house forecast model used by NEPCO to predict the levels of generated energy needed across the 60 months time period. It was concluded that the NEPCO model predicted energy demand higher than the validated generated data model by an average of 5.25 per cent. 8 refs., 5 tabs., 15 figs

  1. Modeling and forecasting of electrical power demands for capacity planning

    Energy Technology Data Exchange (ETDEWEB)

    Al-Shobaki, S. [Hashemite Univ., Zarka (Jordan). Dept. of Industrial Engineering; Mohsen, M. [Hashemite Univ., Zarka (Jordan). Dept. of Mechanical Engineering

    2007-07-01

    Jordan imports oil from neighboring countries for use in power production. As such, the cost of electricity production is high compared to oil producing countries. It is anticipated that Jordan will face major challenges in trying to meet the growing energy and electricity demands while also developing the energy sector in a way that reduces any adverse impacts on the economy, the environment and social life. This paper described the development of forecasting models to predict future generation and sales loads of electrical power in Jordan. Two models that could be used for the prediction of electrical energy demand in Amman, Jordan were developed and validated. An analysis of the data was also presented. The first model was based on the levels of energy generated by the National Electric Power Company (NEPCO) and the other was based on the levels of energy sold by the company in the same area. The models were compared and the percent error was presented. Energy demand was also forecasted across the next 60 months for both models. Results were then compared with the output of the in-house forecast model used by NEPCO to predict the levels of generated energy needed across the 60 months time period. It was concluded that the NEPCO model predicted energy demand higher than the validated generated data model by an average of 5.25 per cent. 8 refs., 5 tabs., 15 figs.

  2. Planning organization and productivity simulation tool for maritime container terminals

    Directory of Open Access Journals (Sweden)

    B. Beškovnik

    2010-09-01

    Full Text Available The article describes a proposed planning organization and productivity simulation tool, with a special emphasis on orientations to the optimization of operations in a maritime container terminal. With the application of an adequate model frame for traffic and technical-technologic forecasting, infrastructure and manpower planning and productivity simulation are possible to measure and increase the productivity in the whole subsystem of the maritime container terminal. The emphasis is mainly put on setting up planning organization in order to collect important information and consequently to raise productivity. This is the main task and goal of terminal management that must develop elements and strategies for optimal operational and financial production. An adequate planning structure must use simplified but efficient simulation tools enabling owners and management to take a vast number of adequate financial and operational decisions. Considering all important and very dynamic facts in container and shipping industry, the proposed simulation tool gives a helpful instrument for checking productivity and its time variation and monitoring a competitive position of a certain maritime terminal with the terminals from the same group. Therefore, the management of every maritime container terminal must establish an appropriate internal planning system as a mechanism for strategic decision support relating basically to the assessment of the best development and optimization solutions for the infrastructure and suprastructure of the entire system.

  3. Planning the nuclear contribution to the Brazilian power program

    International Nuclear Information System (INIS)

    Barbalho, A. Rodrigues; Alves, R. Nazare; Pinto, C. Syllus M.; Souza Santos, T.D. de; Abrao, A.

    1977-01-01

    The thermo-electric power in Brazil accounts for less than 20% of the total generating capacity. Brazil's power is essentially generated hydraulically, which grants the growing development. The electric energy consumption keeps growing, with the annual average rate of 13%/year in the last five years. The present installed capacity is 20 000 MWe and the projections are: 35 000MWe, in 1980; 50 000 MWe in 1985; 75 000 MWe, in 1990 and 150 000 MWe, in 2 000. Most of the hydraulic resources are located in remote areas of the country, very far from the consumption centers. Under the agreement between the Federal Republic of Germany and Brazil (signed in June 1975), besides the nuclear power station, American made, under construction in Agra dos Reis, with a power capacity of 626 MWe, two more units, each one with 1 300 MWe capacity are to be erected at the same site, and planned to be in operation in 1982 and 1983. Several joint German-Brazilian companies will be established for reactor and fuel manufacture, in the country. The Brazilian state holding nuclear company, Empresas Nucleares Brasileiras S/A., NUCLEBRAS, will participate in the formation of all joint companies with at least 51% of capital investments. The Brazilian Government will spend 10 billion dollars (U.S.), during the agreement's duration, to make its industry stronger, to develop its technology and to reduce its dependence on energy imports. Brazil's target: full independence in nuclear technology (including reactor manufacture and complete fuel cycle) in about 15 years [es

  4. Application of mathematical planning in production of filled emulsion rubbers

    Science.gov (United States)

    Pugacheva, I. N.; Molokanova, L. V.; Popova, L. V.; Repin, P. S.

    2018-05-01

    The applicability of mathematical planning of experiment in the field of chemistry and chemical engineering, in particular in the industrial production of synthetic rubbers, is considered in the article. Possibility of using secondary material resources, which are waste products of light industry, in the production of elastomeric compositions is studied. The method of obtaining a powdered cellulose additive from wastes containing cellulose fiber is described. The best way of introducing the obtained additive into elastomeric compositions based on the emulsion rubber is established. Optimal conditions for obtaining filled emulsion rubber with the help of a powdered cellulose additive were established basing on the mathematical planning of experiment.

  5. Short-term hydropower production planning by stochastic programming

    DEFF Research Database (Denmark)

    Fleten, Stein-Erik; Kristoffersen, Trine

    2008-01-01

    -term production planning a matter of spatial distribution among the reservoirs of the plant. Day-ahead market prices and reservoir inflows are, however, uncertain beyond the current operation day and water must be allocated among the reservoirs in order to strike a balance between current profits and expected......Within the framework of multi-stage mixed-integer linear stochastic programming we develop a short-term production plan for a price-taking hydropower plant operating under uncertainty. Current production must comply with the day-ahead commitments of the previous day which makes short...

  6. Polymorphic Uncertain Linear Programming for Generalized Production Planning Problems

    Directory of Open Access Journals (Sweden)

    Xinbo Zhang

    2014-01-01

    Full Text Available A polymorphic uncertain linear programming (PULP model is constructed to formulate a class of generalized production planning problems. In accordance with the practical environment, some factors such as the consumption of raw material, the limitation of resource and the demand of product are incorporated into the model as parameters of interval and fuzzy subsets, respectively. Based on the theory of fuzzy interval program and the modified possibility degree for the order of interval numbers, a deterministic equivalent formulation for this model is derived such that a robust solution for the uncertain optimization problem is obtained. Case study indicates that the constructed model and the proposed solution are useful to search for an optimal production plan for the polymorphic uncertain generalized production planning problems.

  7. Problems of heat sources modeling on stage of isolated power systems expansion planning

    International Nuclear Information System (INIS)

    Malenkov, A.V.; Reshetnikova, L.N.; Sergeev, Yu.A.

    1998-01-01

    It is necessary to use computer codes for evaluation of possible applications and role of nuclear district heating plants in the local self-balancing power and heating systems, which are to be located in the remote isolated and hardly accessible regions in the Far North of Russia. Key factors in determining system configurations and its performances are: (1) interdependency of electricity, heat and fuel supply; (2) long distance between energy consumer centres (from several tens up to some hundred kilometers); and (3) difficulty in export and import of the electricity, especially the fuel in and from neighbouring and remote regions. The problem to challenge is to work out an optimum expansion plan of the local electricity and heat supply system. The ENPEP (ENergy and Power Evaluation Program) software package, which was developed by IAEA together with the USA Argonne National Laboratory, was chosen for this purpose. The Chaun-Bilibino power system (CBPS), an isolated power system in far North-East region of Russia, was selected as the first case of the ENPEP study. ENPEP allows a complex approach in the system expansion optimization planning in the time frame of planning period of up to 30 years. The key ENPEP module, ELECTRIC, considers electricity as the only product. The cogeneration part (heat production) must be considered outside the ELECTRIC model and then the results to be transfer ed to ELECTRIC. The ENPEP study on the Chaun-Bilibino isolated power system has shown that the modelling of the heat supply sources in ENPEP is not a trivial problem. It is very important and difficult to correctly represent specific features of cogeneration process at the same time. (author)

  8. Dynamic Integrated Resource Strategic Planning Model: A Case Study of China’s Power Sector Planning into 2050

    Directory of Open Access Journals (Sweden)

    Yan Xu

    2017-07-01

    Full Text Available This paper proposes a Dynamic Integrated Resource Strategic Planning (DIRSP model based on a semi-Markov decision-making process. Considering the policy transfer probability matrix, we discuss the influence of different policy portfolios and input intensity on the timing and scale of low-carbon transition during the power planning process. In addition, we discuss various planning scenarios from a socio-technical system transition perspective. Scenarios are compiled to compare the pathways of power planning in China during 2015–2050 under different policies, including a typical reproduction pathway with unchanged policy that maintains the original coal-dominated technology pathway, a de-alignment/re-alignment pathway where renewable energy power technologies develop from niches to mainstream while the planning time for peak coal power moves ahead in 10–20 years due to subsidies to renewable and carbon tax policy, and the substitution and reconfiguration pathways in which renewable energy technologies compete with coal power in parallel, in which coal power will peak by 2020 while wind power and solar power will realize large-scale development by 2020 and 2030, respectively. Case study on power planning in China indicates that the methodology proposed in our study can enhance our understanding on the low-carbon transition process and the interaction between energy policy and transition pathway.

  9. Impact of forecast errors on expansion planning of power systems with a renewables target

    DEFF Research Database (Denmark)

    Pineda, Salvador; Morales González, Juan Miguel; Boomsma, Trine Krogh

    2015-01-01

    This paper analyzes the impact of production forecast errors on the expansion planning of a power system and investigates the influence of market design to facilitate the integration of renewable generation. For this purpose, we propose a programming modeling framework to determine the generation...... and transmission expansion plan that minimizes system-wide investment and operating costs, while ensuring a given share of renewable generation in the electricity supply. Unlike existing ones, this framework includes both a day-ahead and a balancing market so as to capture the impact of both production forecasts...... and the associated prediction errors. Within this framework, we consider two paradigmatic market designs that essentially differ in whether the day-ahead generation schedule and the subsequent balancing re-dispatch are co-optimized or not. The main features and results of the model set-ups are discussed using...

  10. Power generation capacity planning under budget constraint in developing countries

    International Nuclear Information System (INIS)

    Afful-Dadzie, Anthony; Afful-Dadzie, Eric; Awudu, Iddrisu; Banuro, Joseph Kwaku

    2017-01-01

    Highlights: • A long term stochastic GEP model with budget constraint is developed. • Model suitable for analyzing GEP problems in developing countries. • Model determines optimal mix, size and timing of future generation capacity needs. • A real case study of the Ghana GEP problem was employed. • Insufficient budget leads to costly generation capacity expansion plans. - Abstract: This paper presents a novel multi-period stochastic optimization model for studying long-term power generation capacity planning in developing countries. A stylized model is developed to achieve three objectives: (1) to serve as a tool for determining optimal mix, size and timing of power generation types in the face of budget constraint, (2) to help decision makers appreciate the consequences of capacity expansion decisions on level of unserved electricity demand and its attendant impact on the national economy, and (3) to encourage the habit of periodic savings towards new generation capacity financing. The problem is modeled using a stochastic mixed-integer linear programming (MILP) technique under demand uncertainty. The effectiveness of the model, together with valuable insights derived from considering different levels of budget constraints are demonstrated using Ghana as a case study. The results indicate that at an annual savings equivalent to 0.75% of GDP, Ghana could finance the needed generation capacity to meet approximately 95% of its annual electricity demand between 2016 and 2035. Additionally, it is observed that as financial constraint becomes tighter, decisions on the mix of new generation capacities tend to be more costly compared to when sufficient funds are available.

  11. Institutional plan -- Institute of Nuclear Power Operations, 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The US nuclear electric utility industry established the Institute of Nuclear Power Operations (INPO) in 1979 to promote the highest levels of safety and reliability -- to promote excellence -- in the operation of its nuclear plants. After its formation, the Institute grew from a handful of on-loan personnel in late 1979 to an established work force of more than 400 permanent and on-loan personnel. INPO's early years were marked by growth and evolution of its programs and organization. The Institute now focuses primarily on the effectiveness and enhancement of established programs and activities. For INPO to carry out its role, it must have the support of its members and participants and a cooperative but independent relationship with the NRC. A basis for that support and cooperation is an understanding of INPO's role. This Institutional Plan is intended to provide that understanding by defining the Institute's role and its major programs. This plan considers the existing and projected needs of the industry and the overall environment in which INPO and its members and participants operate

  12. Decommissioning plan of the nuclear-powered ship 'Mutsu'

    International Nuclear Information System (INIS)

    1992-01-01

    The nuclear-powered ship 'Mutsu' is to be decommissioned at Sekinehama Port immediately after finishing the experimental voyage based on the 'Fundamental plan on the research required for the development of nuclear ships in Japan Atomic Energy Research Institute' decided in March, 1985. The decommissioning plan which determines the methods of the works regarding the decommissioning and others is as follows. In order to utilize the ship hull of Mutsu, the reactor room including the reactor and shielding is removed in a lump, and the removal and isolation method of preserving it as it is on land is adopted. The measures for environment preservation and ensuring the safety of residents are taken, and the sufficient work control is carried out for preventing accidents and reducing the radiation exposure of workers. The ship is used as the ship with ordinary propulsion system for ocean research and the research and development of marine reactors. The utilization of Sekinehama and Ominato facilities is investigated. The reactor room removed from Mutsu is exhibited to public, being preserved safely in a building. (K.I.)

  13. Southern African Power Pool: Planning and Prospects for Renewable Energy

    Energy Technology Data Exchange (ETDEWEB)

    Miketa, Asami [IRENA, Bonn (Germany); Merven, Bruno [Energy Research Centre, Univ. of Cape Town (South Africa)

    2013-06-25

    With the energy systems of many African countries dominated by fossil-fuel sources that are vulnerable to global price volatility, regional and intra-continental power systems with high shares of renewable energy can provide least-cost option to support continued economic growth and address the continent’s acute energy access problem. Unlocking Africa’s huge renewable energy potential could help to take many people out of poverty, while ensuring the uptake of sustainable technologies for the continent’s long-term development. The report examines the ''renewable scenario'' based on a modelling tool developed by IRENA and tested in cooperation with the South African National Energy Development Institute (SANEDI) and the Southern African Development Community (SADC). Initial results from the System Planning and Test (SPLAT) model show that the share of renewable technologies in Southern Africa could increase from the current 10% to as much as 46% in 2030, with 20% of decentralised capacity coming from renewable sources and nearly 80% of the envisaged capacity additions between 2010 and 2030 being provided by renewable energy technologies. Deployment and export of hydropower from the Democratic Republic of Congo’s Inga hydropower project to the SADC region would significantly reduce average electricity generation costs. Analysis using SPLAT – along with a similar model developed for West Africa – can provide valuable input for regional dialogue and energy projects such as the East and Southern Africa Clean Energy Corridor and the Programme for Infrastructure and Development in Africa (PIDA). IRENA, together with partner organisations, has started plans to set up capacity building and development support for energy system modelling and planning for greater integration of renewables in Africa. IRENA is also completing a similar model and study for East Africa and intends to extend this work to Central and North Africa.

  14. West African Power Pool: Planning and Prospects for Renewable Energy

    Energy Technology Data Exchange (ETDEWEB)

    Miketa, Asami [IRENA, Bonn (Germany); Merven, Bruno [Energy Research Centre, Univ. of Cape Town (South Africa)

    2013-06-25

    With the energy systems of many African countries dominated by fossil-fuel sources that are vulnerable to global price volatility, regional and intra-continental power systems with high shares of renewable energy can provide least-cost option to support continued economic growth and address the continent’s acute energy access problem. Unlocking Africa’s huge renewable energy potential could help to take many people out of poverty, while ensuring the uptake of sustainable technologies for the continent’s long-term development. The report examines a ''renewable scenario'' based on a modelling tool developed by IRENA and tested with assistance from the Economic Community of West African States (ECOWAS). Initial results from the ECOWAS Renewable Energy Planning (EREP) model for continental ECOWAS countries show that the share of renewable technologies in the region could increase from the current 22% of electricity generation to as much as 52% in 2030, provided that the cost of these technologies continues to fall and fossil fuel prices continue to rise. In this scenario, nearly half of the envisaged capacity additions between 2010 and 2030 would be with renewable technologies. Analysis using EREP – along with a similar model developed for Southern Africa – can provide valuable input for regional dialogue and energy projects such as the East and Southern Africa Clean Energy Corridor and the Programme for Infrastructure and Development in Africa (PIDA). IRENA, together with partner organisations, has started plans to set up capacity building and development support for energy system modelling and planning for greater integration of renewables in Africa. IRENA is also completing a similar model and study for East Africa and intends to extend this work to Central and North Africa.

  15. Product Chain Action Plan tomato production in Kenya and Tanzania

    NARCIS (Netherlands)

    Visser, de C.L.M.

    2007-01-01

    With the importance of the field vegetable sector for Africa in mind and the constraints attached to that sector, the AfriVeg project (“Development of commercial field vegetable production, distribution and marketing for the East African market”) was developed by Wageningen UR to contribute to

  16. High RF Power Production for CLIC

    CERN Document Server

    Syratchev, I; Adli, E; Taborelli, M

    2007-01-01

    The CLIC Power Extraction and Transfer Structure (PETS) is a passive microwave device in which bunches of the drive beam interact with the impedance of the periodically loaded waveguide and excite preferentially the synchronous mode. The RF power produced (several hundred MW) is collected at the downstream end of the structure by means of the Power Extractor and delivered to the main linac structure. The PETS geometry is a result of multiple compromises between beam stability and main linac RF power needs. Another requirement is to provide local RF power termination in case of accelerating structure failure (ON/OFF capability). Surface electric and magnetic fields, power extraction method, HOM damping, ON/OFF capability and fabrication technology were all evaluated to provide a reliable design

  17. To plan or not to plan: Does planning for production remove facilitation from associative priming?

    Science.gov (United States)

    Jongman, Suzanne R; Meyer, Antje S

    2017-11-01

    Theories of conversation propose that in order to have smooth transitions from one turn to the next, speakers already plan their response while listening to their interlocutor. Moreover, it has been argued that speakers align their linguistic representations (i.e. prime each other), thereby reducing the processing costs associated with concurrent listening and speaking. In two experiments, we assessed how identity and associative priming from spoken words onto picture naming were affected by a concurrent speech planning task. In a baseline (no name) condition, participants heard prime words that were identical, associatively related, or unrelated to target pictures presented two seconds after prime onset. Each prime was accompanied by a non-target picture and followed by its recorded name. The participant did not name the non-target picture. In the plan condition, the participants first named the non-target picture, instead of listening to the recording, and then the target. In Experiment 1, where the plan- and no-plan conditions were tested between participants, priming effects of equal strength were found in the plan and no-plan condition. In Experiment 2, where the two conditions were tested within participants, the identity priming effect was maintained, but the associative priming effect was only seen in the no-plan but not in the plan condition. In this experiment, participant had to decide at the onset of each trial whether or not to name the non-target picture, rendering the task more complex than in Experiment 1. These decision processes may have interfered with the processing of the primes. Thus, associative priming can take place during speech planning, but only if the cognitive load is not too high. Copyright © 2017 Elsevier B.V. All rights reserved.

  18. 76 FR 30147 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-05-24

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project AGENCY: Western Area Power.... SUMMARY: The Western Area Power Administration (Western), a Federal power marketing agency of the..., the Energy Management and Planning Program (Program), and the Conformed General Consolidated Power...

  19. 76 FR 23583 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-04-27

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project AGENCY: Western Area Power... Area Power Administration (Western), a Federal power marketing agency of the Department of Energy (DOE), will apply the Energy Planning and Management Program (Program) Power Marketing Initiative (PMI), as...

  20. Modernisation of the Olkiluoto nuclear power plant increases the power production efficiency under safe limits

    International Nuclear Information System (INIS)

    Valkeapaeae, R.

    1995-01-01

    Teollisuuden Voima Oy published the efficiency increment plans as a part of the modernisation of the Olkiluoto nuclear power plant. The power of the reactor units, originally designed for 660 MW will now be increased for a second time. The former improvements were made in 1994. The power of the units was increased to 710 MW. After this new renovation the power of the both units will be 830-840 MW. (2 figs.)

  1. 30 GHz High Power Production for CLIC

    CERN Document Server

    Syratchev, I V

    2006-01-01

    The CLIC Power Extraction and Transfer Structure (PETS) is a passive microwave device in which bunches of the drive beam interact with the impedance of the periodically loaded waveguide and excite preferentially the synchronous TM01 mode at 30 GHz. The RF power produced (several hundred MW) is collected at the downstream end of the structure by means of the Power Extractor and conveyed to the main linac structure. The PETS geometry is a result of multiple compromises between beam stability along a single decelerator sector (600 m) and the active length of the structure to match the main linac RF power needs and layout. Surface electric and magnetic fields, power extraction method, HOM damping, ON/OFF capability and fabrication technology were all evaluated to provide a reliable design.

  2. Comparative gross domestic production and electricity consumption per capita in the context of nuclear power prospect

    International Nuclear Information System (INIS)

    Ridzuan Abdul Mutalib; Maragatham Kumar; Nik Arlina Nik Ali; Abi Muttaqin Jalal Bayar; Aisya Raihan Abdul Kadir; Muhammed Zulfakar Zolkaffly; Azlinda Aziz; Jamal Khaer Ibrahim

    2008-08-01

    Malaysia, based on its economic and industrial growth level should be able to absorb nuclear technology and capacity in implementing a nuclear power programme. Malaysia Gross Domestic Production (GDP) and electricity consumption (kWh per capita is higher compared with other developing countries, which have already announced their plans to implement nuclear power programme. Furthermore, Asia reliance on nuclear power plants to meet growing energy needs in the near future is also significantly increasing. This paper presents the comparative GDP and kWh per capita in Asia and globally in the context of nuclear power prospect in Malaysia. (Author)

  3. Structuring front-end innovation activities throughout strategic product planning

    Directory of Open Access Journals (Sweden)

    Thaisa Rodrigues

    Full Text Available Abstract Strategic product planning (SPP for new product development (NPD in the front-end of innovation (FEI is a great challenge for managers and practitioners. This article analyzes the structuring process of FEI activities during SPP. A research was carried out with 78 industries from both food and furniture in Brazil. Our study revealed that FEI activities are structured in an intricate network with a high level of complexity and interdependence. The large amount of activities and the complexity in structuring them denote that companies are concerned to reduce uncertainties and risks intensifying the planning phase.

  4. Improving productivity levels: family planning services for factory workers.

    Science.gov (United States)

    Darmokusumo, H V

    1989-10-01

    In May 1984, the Minister of Manpower in Indonesia, the Chairman of the BKKBN, and representatives of the employers' and workers' organizations of Indonesia issued a joint decree pledging that they would work together to enhance the implementation of the family planning program among workers in the organized sector. 1 objective of the decree is to improve workers' productivity and the standard of living of workers and their families by implementing a family planning program. 1 baseline survey and a clinic-based survey in 5 provinces revealed that 90% of women workers are between 21-40, or are of reproductive age, and are sexually active. Only about 50% are practicing family planning; the other 50% are afraid to practice family planning due to potential side effects of various methods. This fear was most often caused by negative rumors spread by unsatisfied family planning clients. Placing materials for family planning promotion such as instructional posters and video programs advertising contraceptive services in the work setting may increase knowledge and help alleviate some of this fear. Other studies of family planning services show that employees prefer female medical doctors or midwives as service providers, employees are willing to pay for services (but can only afford a small fee), and family planning service points should be near employees' work sites.

  5. Production planning and control of less emitting production systems

    Energy Technology Data Exchange (ETDEWEB)

    Haasis, H.D. [Bremen Univ. (Germany)

    1995-12-31

    The concept of integral environmental protection has been growing in importance within Western Europe in recent years. Increasingly, it has come to be recognized that no one part of the environment is separate from any other, it functions as a whole. Yet, pollution control was until recently, usually based on an approach which considers emissions to air, water, and land separately. That has begun to change, particularly since the 1987 report by the World Commission on Environment and Development. This can be recognized, for example, within the proposal for a Directive of the Council of the European Union on Integrated Pollution Prevention and Control. By this, the environmental media are placed on an equal legislative footing so that the final result will be that the way in which an installation is operated will be better for the whole environment. In other words, less emission production systems are obtained. Realization of an integral concept or of less emission production systems initially requires technical measures for the avoidance and the minimization of emissions, as well as recovery and recycling of materials and substances

  6. Production planning and control of less emitting production systems

    Energy Technology Data Exchange (ETDEWEB)

    Haasis, H D [Bremen Univ. (Germany)

    1996-12-31

    The concept of integral environmental protection has been growing in importance within Western Europe in recent years. Increasingly, it has come to be recognized that no one part of the environment is separate from any other, it functions as a whole. Yet, pollution control was until recently, usually based on an approach which considers emissions to air, water, and land separately. That has begun to change, particularly since the 1987 report by the World Commission on Environment and Development. This can be recognized, for example, within the proposal for a Directive of the Council of the European Union on Integrated Pollution Prevention and Control. By this, the environmental media are placed on an equal legislative footing so that the final result will be that the way in which an installation is operated will be better for the whole environment. In other words, less emission production systems are obtained. Realization of an integral concept or of less emission production systems initially requires technical measures for the avoidance and the minimization of emissions, as well as recovery and recycling of materials and substances

  7. Applying linear programming model to aggregate production planning of coated peanut products

    Science.gov (United States)

    Rohmah, W. G.; Purwaningsih, I.; Santoso, EF S. M.

    2018-03-01

    The aim of this study was to set the overall production level for each grade of coated peanut product to meet market demands with a minimum production cost. The linear programming model was applied in this study. The proposed model was used to minimize the total production cost based on the limited demand of coated peanuts. The demand values applied to the method was previously forecasted using time series method and production capacity aimed to plan the aggregate production for the next 6 month period. The results indicated that the production planning using the proposed model has resulted a better fitted pattern to the customer demands compared to that of the company policy. The production capacity of product family A, B, and C was relatively stable for the first 3 months of the planning periods, then began to fluctuate over the next 3 months. While, the production capacity of product family D and E was fluctuated over the 6-month planning periods, with the values in the range of 10,864 - 32,580 kg and 255 – 5,069 kg, respectively. The total production cost for all products was 27.06% lower than the production cost calculated using the company’s policy-based method.

  8. Status of hydrogen production by nuclear power

    International Nuclear Information System (INIS)

    Chang, Jong Wa; Yoo, Kun Joong; Park, Chang Kue

    2001-07-01

    Hydrogen production methods, such as electrolysis, thermochemical method, biological method, and photochemical method, are introduced in this report. Also reviewed are current status of the development of High Temperatrue Gas Coooled Reactor, and it application for hydrogen production

  9. Mapping Wind Farm Loads and Power Production - A Case Study on Horns Rev 1

    DEFF Research Database (Denmark)

    Galinos, Christos; Dimitrov, Nikolay Krasimirov; Larsen, Torben J.

    2016-01-01

    , the ones facing a free sector towards west and south. The power production results of few turbines are compared with SCADA data. The results of this paper are expected to have significance for operation and maintenance planning, where the schedules for inspection and service activities can be adjusted...

  10. The influence of ERP implementation on the division of power at the production-sales interface

    NARCIS (Netherlands)

    de Vries, J.; Boonstra, A.

    2012-01-01

    Purpose - The purpose of this paper is to develop and validate a model that demonstrates the influence of enterprise resource planning (ERP) implementation on the power and interests of actors at the production-sales interface, and vice versa. Design/methodology/approach - An empirical in-depth

  11. Multi-Objective Fuzzy Linear Programming In Agricultural Production Planning

    Directory of Open Access Journals (Sweden)

    H.M.I.U. Herath

    2015-08-01

    Full Text Available Abstract Modern agriculture is characterized by a series of conflicting optimization criteria that obstruct the decision-making process in the planning of agricultural production. Such criteria are usually net profit total cost total production etc. At the same time the decision making process in the agricultural production planning is often conducted with data that accidentally occur in nature or that are fuzzy not deterministic. Such data are the yields of various crops the prices of products and raw materials demand for the product the available quantities of production factors such as water labor etc. In this paper a fuzzy multi-criteria mathematical programming model is presented. This model is applied in a region of 10 districts in Sri Lanka where paddy is cultivated under irrigated and rain fed water in the two main seasons called Yala and Maha and the optimal production plan is achieved. This study was undertaken to find out the optimal allocation of land for paddy to get a better yield while satisfying the two conflicting objectives profit maximizing and cost minimizing subjected to the utilizing of water constraint and the demand constraint. Only the availability of land constraint is considered as a crisp in nature while objectives and other constraints are treated as fuzzy. It is observed that the MOFLP is an effective method to handle more than a single objective occurs in an uncertain vague environment.

  12. An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

    International Nuclear Information System (INIS)

    Elkarmi, Fawwaz; Abu-Shikhah, Nazih; Abu-Zarour, Mohammad

    2010-01-01

    Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems.

  13. An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

    Energy Technology Data Exchange (ETDEWEB)

    Elkarmi, Fawwaz; Abu-Shikhah, Nazih [Al-Ahliyya Amman University, College of Engineering, AA University Post Office, Zip code 19328 (Jordan); Abu-Zarour, Mohammad [NEPCO, Department of Generation Planning, P.O. Box 2310, Amman 11194 (Jordan)

    2010-10-15

    Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems. (author)

  14. Policy planning for nuclear power: an overview of the main issues and requirements

    International Nuclear Information System (INIS)

    1995-05-01

    The report contains information on the political, governmental, economic, financial and technical issues and requirements associated with planning and implementing a safe, economic and reliable nuclear power programme. It highlights the main areas in which policies must be developed and decisions taken, as well as the role and responsibilities of government, the plant owner and national industry. Also presented are the main criteria to assist policy planners in defining options and strategies which can achieve a balance among such objectives as cost effective and efficient electricity production, realistic and acceptable financing arrangements, national development requirements, safety and environmental protection. (NHA)

  15. Pluri-annual planning of power generation investments. 2005-2015 era

    International Nuclear Information System (INIS)

    2006-01-01

    The pluri-annual planning of power generation investments (PPI) is provided by article 6 of the law from February 10, 2000 relative to the modernization and development of the electric utility. The PPI is the concrete translation of the energy policy and aims to identify the necessary investments with respect to the security of power supplies and beyond the already known commitments. In the framework of market deregulation and respect of competition, the PPI is limited to the identification of such investments but not to their realization. This document, which corresponds to the 2005 exercise, is the second report to the Parliament. It stresses on the following points: the mastery of power demand and the demand scenarios, the level of accepted risk, the carrying out of the development of renewable energy sources (5 GW by 2010 and 12.5 GW by 2016 for wind power, and 6 TWh more for biomass by 2016), the start-up of an EPR reactor in 2012, the investment needs for classical thermal power plants (+2.6 GW of diesel fuel power plants and +500 MW of combustion turbines as decided by EdF), the development of production means in 2 regions with specific needs: Provence-Alpes-Cote d'Azur and Bretagne (Brittany), and also in insular areas (Corsica and overseas territories), and the reflexions to carry on in continuation of the PPI. (J.S.)

  16. Towards a more efficient energy use in photovoltaic powered products

    NARCIS (Netherlands)

    Kan, S.Y.; Strijk, R.

    2006-01-01

    This paper analyzes the energy saving and power management solutions necessary to improve the energy consumption efficiency in photovoltaic powered products. Important in the design of such products is not only the energy supply optimization required to deliver the actual energy to fulfil their

  17. Economic feasibility constraints for renewable energy source power production

    International Nuclear Information System (INIS)

    Biondi, L.

    1992-01-01

    Suitable analysis criteria for use in economic feasibility studies of renewable energy source power plants are examined for various plant types, e.g., pumped storage hydroelectric, geothermal, wind, solar, refuse-fuelled, etc. The paper focusses on the impacts, on operating cost and rate structure, of the necessity, depending on demand characteristics, to integrate renewable energy source power production with conventional power production in order to effectively and economically meet peak power demand. The influence of commercialization and marketing trends on renewable energy source power plant economic feasibility are also taken into consideration

  18. A probabilistic assessment of large scale wind power development for long-term energy resource planning

    Science.gov (United States)

    Kennedy, Scott Warren

    A steady decline in the cost of wind turbines and increased experience in their successful operation have brought this technology to the forefront of viable alternatives for large-scale power generation. Methodologies for understanding the costs and benefits of large-scale wind power development, however, are currently limited. In this thesis, a new and widely applicable technique for estimating the social benefit of large-scale wind power production is presented. The social benefit is based upon wind power's energy and capacity services and the avoidance of environmental damages. The approach uses probabilistic modeling techniques to account for the stochastic interaction between wind power availability, electricity demand, and conventional generator dispatch. A method for including the spatial smoothing effect of geographically dispersed wind farms is also introduced. The model has been used to analyze potential offshore wind power development to the south of Long Island, NY. If natural gas combined cycle (NGCC) and integrated gasifier combined cycle (IGCC) are the alternative generation sources, wind power exhibits a negative social benefit due to its high capacity cost and the relatively low emissions of these advanced fossil-fuel technologies. Environmental benefits increase significantly if charges for CO2 emissions are included. Results also reveal a diminishing social benefit as wind power penetration increases. The dependence of wind power benefits on natural gas and coal prices is also discussed. In power systems with a high penetration of wind generated electricity, the intermittent availability of wind power may influence hourly spot prices. A price responsive electricity demand model is introduced that shows a small increase in wind power value when consumers react to hourly spot prices. The effectiveness of this mechanism depends heavily on estimates of the own- and cross-price elasticities of aggregate electricity demand. This work makes a valuable

  19. Climatic impact of Norwegian gas power production

    International Nuclear Information System (INIS)

    Aune, Finn Roar; Golombek, Rolf; Kittelsen, Sverre A.C.; Rosendal, Knut Einar

    2001-01-01

    This article discusses model calculations of the impact of a Norwegian gas power plant on the total carbon dioxide emission in Western Europe. The authors have set up a model that is based on the assumption that the European markets for electricity and gas be liberalized as defined in various EU directives. The model calculates all energy prices and the energy produced and consumed in Western Europe within a time horizon where all the capacities of the energy sector are given. If gas power plants are built in Norway after such liberalization, the model predicts a reduction of CO 2 emissions in Western Europe even if the gas power plant increases the local emission in Norway. This is primarily because of the phasing-out of the coal-fired power plants in other countries. Alternative calculations using different assumptions about taxes, transportation capacity, minimum run-off years in Norway give the same type of results. Thus, the principal result about the climatically beneficial effect of a Norwegian gas power plant is robust within the model. However, alternative assumptions about the extent of the liberalization and the time horizon may lead to other conclusions. In any case, the impact of a Norwegian gas power plant (6 TWh) is so small on the European scale as to be rather symbolic

  20. Phonological Planning during Sentence Production: Beyond the Verb.

    Science.gov (United States)

    Schnur, Tatiana T

    2011-01-01

    The current study addresses the extent of phonological planning during spontaneous sentence production. Previous work shows that at articulation, phonological encoding occurs for entire phrases, but encoding beyond the initial phrase may be due to the syntactic relevance of the verb in planning the utterance. I conducted three experiments to investigate whether phonological planning crosses multiple grammatical phrase boundaries (as defined by the number of lexical heads of phrase) within a single phonological phrase. Using the picture-word interference paradigm, I found in two separate experiments a significant phonological facilitation effect to both the verb and noun of sentences like "He opens the gate." I also altered the frequency of the direct object and found longer utterance initiation times for sentences ending with a low-frequency vs. high-frequency object offering further support that the direct object was phonologically encoded at the time of utterance initiation. That phonological information for post-verbal elements was activated suggests that the grammatical importance of the verb does not restrict the extent of phonological planning. These results suggest that the phonological phrase is unit of planning, where all elements within a phonological phrase are encoded before articulation. Thus, consistent with other action sequencing behavior, there is significant phonological planning ahead in sentence production.

  1. Marketing a managed care plan: achieving product differentiation.

    Science.gov (United States)

    Romeo, N C

    1996-01-01

    The health care marketplace is changing dramatically, even without federal reform measures. This is a volatile, yet promising, time to market a managed care plan. Before marketing the product, it is critical that the competition is thoroughly evaluated and consumer and employer needs are researched. The final product should be distinguishable from the competition and address market needs. Promotion can then begin, utilizing a proactive public relations and advertising campaign in addition to traditional methods of marketing.

  2. White Rose development plan amendment production volume increase

    International Nuclear Information System (INIS)

    2006-09-01

    In January 2001, Husky Oil Operations Limited (Husky), in joint-venture with Petro-Canada, submitted a Benefits Plan for the White Rose Development to the Canada- Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB). This revised document provided the case for requesting an increase in the facility maximum daily production rate and the average annual production rate for the White Rose field from 100,000 barrels per day (bpd) as stated in the approved White Rose Development Plan to 140,000 bpd. In order to determine the potential for increasing oil production through the Floating Production, Storage and Offloading (FPSO) vessel, two things were considered, namely the proper reservoir management of the White Rose field to ensure optimum resource recovery, and the capacity of the FPSO topsides processing system and supporting utilities to accommodate increased production. This document presented a detailed review of all the implications of increased production on the South White Rose Reservoir. In addition, the results from FPSO performance testing were reviewed, including a study of options for de-bottlenecking the process plant on the topsides and capacity testing of selected process streams and support systems. Vibration analysis was conducted before and during performance testing in July 2006 and a small number of areas addressed. The document also addressed flow metering, resource management, certifying authority review, safety plan revisions, environmental effects, as well as benefits to Canada and Newfoundland. 21 tabs., 60 refs

  3. Leadership and productivity in planning organizations: a case study.

    Science.gov (United States)

    Whitcomb, G R; Williams, E G

    1978-01-01

    This paper presents the findings of a case study dealing mainly with the effects of two divergent leadership styles on the productivity of a planning organization. Changes in various kinds of participation in the agency's activities--an important side effect--are also linked to the two leadership patterns. The agency studied, a private health and welfare council in a medium-sized American city, varied considerably in its output of planning activities and decision making depending on whether it had a participative or a directive leader. The results indicated that there was a trade-off between such highly revered social values as leadership and the extent of participation by staff, board members, and local agency administrators. Implications focus on ways to achieve diversity in communication style among managers and the role of productivity measures in determining the overall effectiveness of planning agencies.

  4. Automating the production planning of a 3D printing factory

    NARCIS (Netherlands)

    Adan, I.J.B.F.; Pogromskiy, A.Y.; Freens, J.P.N.; Ploegmakers, H.; Yilmaz, L.; Chan, W.K.V.; Moon, I.; Roeder, T.M.K.; Macal, C.; Rossetti, M.D.

    2015-01-01

    To increase a 3D printer's throughput and decrease the print objects' lead times, composing good batches for 3D printers in high-volume 3D printing environments is of great importance. Since manual planners cannot oversee the whole production planning, they tend to make sub-optimal decisions. This

  5. A Fuzzy Linear Programming Approach for Aggregate Production Planning

    DEFF Research Database (Denmark)

    Iris, Cagatay; Cevikcan, Emre

    2014-01-01

    a mathematical programming framework for aggregate production planning problem under imprecise data environment. After providing background information about APP problem, together with fuzzy linear programming, the fuzzy linear programming model of APP is solved on an illustrative example for different a...

  6. Planning at the Phonological Level during Sentence Production

    Science.gov (United States)

    Schnur, Tatiana T.; Costa, Albert; Caramazza, Alfonso

    2006-01-01

    In two picture-word interference experiments we examined whether phrase boundaries affected how far in advance speakers plan the sounds of words during sentence production. Participants produced sentences of varying lengths (short determiner + noun + verb or long determiner + adjective + noun + verb) while ignoring phonologically related and…

  7. Proceedings of national avian-wind power planning meeting II

    International Nuclear Information System (INIS)

    1998-02-01

    This meeting was the second in a series. The purposes of this meeting were to: (1) provide information on avian/wind power interactions that will help meet the needs of regulators, researchers, and other stakeholders concerned with responsible development and permitting of wind plants; (2) create dialogue among regulators, researchers and other stakeholders to help all parties understand the role that research can play in responsible development and permitting of wind plants, and allow researchers to understand the relevance of their research to the process; and (3) propose research projects and the appropriate sponsorship. The meeting began with oral presentations and discussions of nine White Papers on the theory and methods for studying and understanding impacts. The Proceedings include the written version of each of the nine White Papers, plus a summary of the oral discussion associated with each paper. The second part of the meeting consisted of four working group sessions: (1) site evaluation and pre-permit research and planning; (2) operational monitoring; (3) modeling and forecasting, including population dynamics models; and (4) avian behavior and mortality reduction. The Proceedings includes a summary of the discussions on these topics, including each working group's recommendations for future research or associated activities. A final plenary session drew together the main recommendations

  8. Proceedings of national avian-wind power planning meeting 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This meeting was the second in a series. The purposes of this meeting were to: (1) provide information on avian/wind power interactions that will help meet the needs of regulators, researchers, and other stakeholders concerned with responsible development and permitting of wind plants; (2) create dialogue among regulators, researchers and other stakeholders to help all parties understand the role that research can play in responsible development and permitting of wind plants, and allow researchers to understand the relevance of their research to the process; and (3) propose research projects and the appropriate sponsorship. The meeting began with oral presentations and discussions of nine White Papers on the theory and methods for studying and understanding impacts. The Proceedings include the written version of each of the nine White Papers, plus a summary of the oral discussion associated with each paper. The second part of the meeting consisted of four working group sessions: (1) site evaluation and pre-permit research and planning; (2) operational monitoring; (3) modeling and forecasting, including population dynamics models; and (4) avian behavior and mortality reduction. The Proceedings includes a summary of the discussions on these topics, including each working group`s recommendations for future research or associated activities. A final plenary session drew together the main recommendations.

  9. To plan or not to plan: Does planning for production remove facilitation from associative priming?

    NARCIS (Netherlands)

    Jongman, S.R.; Meyer, A.S.

    2017-01-01

    Theories of conversation propose that in order to have smooth transitions from one turn to the next, speakers already plan their response while listening to their interlocutor. Moreover, it has been argued that speakers align their linguistic representations (i.e. prime each other), thereby reducing

  10. Investigation of pressure retarded osmosis power production

    Directory of Open Access Journals (Sweden)

    Taousanidis Nikolaos

    2017-01-01

    Full Text Available A major source of energy exists where there is mixing between aqueous solutions of different salinities. This energy source is particularly concentrated where fresh water rivers flow on to the ocean. The power, represented by the osmotic pressure difference between fresh water and salt water, may be called salinity gradient power. In this study the pressure retarded osmosis method for the extraction of salinity gradients’ energy is investigated, main problems and difficulties are pointed out and finally the whole subject is justified with experimental results.

  11. Strategic plan for the development of core technologies for the Korean advanced nuclear power reactor for export

    International Nuclear Information System (INIS)

    Moon, Joo Hyun; Cho, Young Ho

    2010-01-01

    With the soaring oil price and worsening global warming, nuclear power has attracted considerable attention on a global scale and a new large market of nuclear power plants (NPPs) is expected. The Korean government aims to export up to 10 NPPs by 2012, based on the successful export of 2 NPPs to the UAE in 2009. It is also going to develop a follow-up model of the Advanced Power Reactor (APR) 1400, and join the world's NPP market under the banner of Korea's original reactor type. For this, it promulgated the strategic plan, NuTech 2012, a technology development plan intended for the early acquisition of core technologies for the Korean advanced NPP design and domestic production of the main components in NPP. This paper introduces the strategic plan of NuTech 2012. (orig.)

  12. Soedra's ecological forest management plans. Effects on production and economy

    International Nuclear Information System (INIS)

    Viklund, E.

    1998-01-01

    In 1995 SOEDRA Skog, Sweden's largest forest owners association, started making ecological forest management plans, Groena skogsbruksplaner. The ecological forest management plans are divided into different compartments in which the management is adapted to the present ecological conditions. The stands are divided into four different categories depending on the different values of nature conservation. The object of this study was to find an easy method to quantify and describe the effects of nature conservation on economy and forest production in SOEDRA:s ecological forest management plans. The developed and purposed method, called PLAN-metoden, does not consider the interests, measures beyond the period of the plan, or losses due to snow or wind. It calculates the difference between the purposed measures in the ecological management plan and an alternative with management according to the requirements of the present Forestry Act. The economic effects of nature conservation varies between a net profit of 0,3% and a cost of 9,1% when calculated with the cash-flow method. The average decrease of possible cutting of merchantable timber was 11,3% and varies between 3,1 and 32,9%. The average decrease of cutting possibilities was 12,9% and varies between a decrease of 0,7% and a decrease of 28,3% when calculated with a present value method. Mainly mature, well-stocked compartments, which are considered not to be managed in the future, give rise to high costs. Properties with unprofitable thinnings and costly scarification, regeneration and cleaning seem to be favoured by the nature conservation in the plans. The Ecological management plans are expected to be of great importance to the members of SOEDRA. The interest in nature conservation is larger than that of economical issues. In order to avoid unsatisfactory results the planning should be accomplished in close personal contact with the forest owner Examination paper 1998-1. 21 refs, 2 figs, 39 tabs

  13. Home-based radiology transcription and a productivity pay plan.

    Science.gov (United States)

    Kerr, K

    1997-01-01

    Shands Hospital in Gainesville, Fla., decided to evaluate the way it provided transcription services in its radiology department. It identified four goals: increased productivity, decreased operating expense, finding much needed space in the radiology department and increasing employee morale. The department performs 165,000 procedures annually, with 66 radiologists, 29 faculty, and 37 residents and fellows on staff. Six FTEs comprised the transcription pool in the radiology department, with transcription their only duty. Transcriptionists were paid an hourly rate based on their years of service, not their productivity. Evaluation and measurement studies were undertaken by the hospital's management systems engineering department. The transcriptionists' hours were then changed to provide coverage during the periods of heaviest dictation. The productivity level of the transcription staff was also measured and various methods of measurement reviewed. The goal was a pure incentive pay plan that would reward employees for every increase in productivity. The incentive pay plan was phased in over a three-month period. Transcriptionists were paid for work performed, with no base pay beyond minimum wage. The move to home-based transcription was planned. The necessary equipment was identified and various issues specific to working at home were addressed. Approximately six months later, the transcriptionists were set up to work at home. The astounding results achieved are presented: 28% increase in productivity, operational cost savings exceeding $25,000 and a space savings of 238 square feet.

  14. Profitability of Qualified-Labour-Power Production

    Science.gov (United States)

    Baldino, Roberto Ribeiro; Cabral, Tânia Cristina Baptista

    2015-01-01

    In Baldino and Cabral (2013) we introduced the concept of qualified labour-power as the commodity produced by the school system. In the present article we outline a quantitative model to evaluate the profit rate of educational programmes. We compare a medical school programme with a teacher education programme at a public university in Brazil,…

  15. External Costs Related to Power Production Technologies

    DEFF Research Database (Denmark)

    Ibsen, Liselotte Schleisner; Nielsen, Per Sieverts

    1997-01-01

    of the Danish part of the project is to implement the framework for externality evaluation, for three different power plants located in Denmark. The paper will focus on the assessment of the impacts of the whole fuel cycles for wind, natural gas and biogas. Priority areas for environmental impact assessment...

  16. Electricity derivative markets: Investment valuation, production planning and hedging

    Energy Technology Data Exchange (ETDEWEB)

    Naesaekkaelae, E.

    2005-07-01

    This thesis studies electricity derivative markets from a view point of an electricity producer. The traditionally used asset pricing methods, based on the no arbitrage principle, are extended to take into account electricity specific features: the non storability of electricity and the variability in the load process. The sources of uncertainty include electricity forward curve, prices of resources used to generate electricity, and the size of the future production. Also the effects of competitors' actions are considered. The thesis illustrates how the information in the derivative prices can be used in investment and production planning. In addition, the use of derivatives as a tool to stabilize electricity dependent cash flows is considered. The results indicate that the information about future electricity prices and their uncertainty, obtained from derivative markets, is important in investment analysis and production planning. (orig.)

  17. Electricity derivative markets: Investment valuation, production planning and hedging

    International Nuclear Information System (INIS)

    Naesaekkaelae, E.

    2005-01-01

    This thesis studies electricity derivative markets from a view point of an electricity producer. The traditionally used asset pricing methods, based on the no arbitrage principle, are extended to take into account electricity specific features: the non storability of electricity and the variability in the load process. The sources of uncertainty include electricity forward curve, prices of resources used to generate electricity, and the size of the future production. Also the effects of competitors' actions are considered. The thesis illustrates how the information in the derivative prices can be used in investment and production planning. In addition, the use of derivatives as a tool to stabilize electricity dependent cash flows is considered. The results indicate that the information about future electricity prices and their uncertainty, obtained from derivative markets, is important in investment analysis and production planning. (orig.)

  18. Refinery production planning and scheduling: the refining core business

    Directory of Open Access Journals (Sweden)

    M. Joly

    2012-06-01

    Full Text Available Intelligent production planning and scheduling are of paramount importance to ensure refinery profitability, logistic reliability and safety at the local and corporate levels. In Brazil, such activities play a particularly critical role, since the Brazilian downstream model is moving towards a demand-driven model rather than a supply-driven one. Moreover, new and specialized non-linear constraints are continuously being incorporated into these large-scale problems: increases in oil prices implying the need for processing poor quality crudes, increasing demand and new demand patterns for petroleum products, new stringent environmental regulations related to clean fuels and start-up of new production technologies embedded into more complex refining schemes. This paper aims at clarifying the central role of refinery planning and scheduling activities in the Petrobras refining business. Major past and present results are outlined and corporate long-term strategies to deal with present and future challenges are presented.

  19. Outline of construction planning on No. 2 Reactor of the Shika Nuclear Power Plant

    International Nuclear Information System (INIS)

    Nakagawa, Tetsuro; Kadoki, Shuichi; Kubo, Tetsuji

    1999-01-01

    The Hokuriku Electric Co., Ltd. carries out the expansion of the Shika Nuclear Power Plant No.2 (ABWR) to start its in March 2006. It is situated in north neighboring side of No. 1 reactor under operation at present, and its main buildings are planned to position a reactor building at mountain side and a turbine building at sea side as well as those in the No. 1 reactor. And, cooling water for steam condenser was taken in from an intake opening built at north side of the lifting space situated at the front of the power plant, and discharged into seawater from a flashing opening positioned about 600 m offing. Here were described on outline of main civil engineering such as base excavation engineering, concrete caisson production, oceanic establishment engineering, and facility for steam condenser, and characteristics of the engineering. (G.K.)

  20. Integrating competition and planning: A mixed institutional model of the Brazilian electric power sector

    International Nuclear Information System (INIS)

    Bajay, S.V.

    2006-01-01

    During the past decade, the Brazilian electric power sector went through similar institutional changes taken place in both developing and developed countries. The main goals for such changes were to inject competition into the generation and supply links of the sector's production chain and to reduce public debt via privatization of state-owned utilities that dominated the pre-reform sector. This paper discusses why these changes took place in Brazil and explains why the results of the reform model implemented by the previous federal administration were unsatisfactory. The current federal administration has substantially altered the prior model, aiming to remedy insufficient private investment in new power stations that caused a serious power shortage in 2001. The paper addresses the main characteristics of the new model, which implements (a) public biddings of new power plants for all distribution utilities in the country, and (b) forward planning of optimal commissioning times and capacity of new plants. The paper ends with a discussion of the potential benefits and drawbacks of the new scheme and the role of the regulator in the early stage of the ongoing transition in the Brazilian electrical power industry. (author)

  1. Export of electric power through industrial products

    International Nuclear Information System (INIS)

    Azevedo, J.B.L. de; David, J.M.S.; Campos, J.M.; Perecmanis, J.; Carneiro, N.S.

    1990-01-01

    We forecast the electrical energy incorporated to the exports of products of the industrial sectors of steel, aluminium, ferro-alloys, chlorine and caustic soda, pulp and paper and petrochemistry, accordingly to scenarios for these sectors consistent with a macro economic reference scenario, for the period 1990/2000. We also compare the electrical energy exported through those industrial products with the forecasted industrial and total markets of electrical energy. (author)

  2. Planning in Sentence Production: Evidence for the Phrase as a Default Planning Scope

    Science.gov (United States)

    Martin, Randi C.; Crowther, Jason E.; Knight, Meredith; Tamborello, Franklin P., II; Yang, Chin-Lung

    2010-01-01

    Controversy remains as to the scope of advanced planning in language production. Smith and Wheeldon (1999) found significantly longer onset latencies when subjects described moving-picture displays by producing sentences beginning with a complex noun phrase than for matched sentences beginning with a simple noun phrase. While these findings are…

  3. Policy planning for nuclear power: An overview of the main issues and requirements

    International Nuclear Information System (INIS)

    1993-08-01

    This special report, Policy Planning for Nuclear Power: An Overview of the Main Issues and Requirements, has been prepared in response to the express request of a number of IAEA Member States for a document to assist makers in developing countries on the introduction of nuclear power. The report contains information on the political, governmental, economic, financial and technical issues and requirements associated with planning and implementing a safe, economic and reliable nuclear power programme. It highlights the main areas in which policies must be developed and decisions taken, as well as the role and responsibilities of government, the plant owner and national industry. Also presented are the main criteria to assist policy planners in defining options and strategies which can achieve a balance among such objectives as cost effective and efficient electricity production, realistic and acceptable financing arrangements, national development requirements, safety and environmental protection. Further information and details on the technical and other issues presented in this report are given in the list of related IAEA publications and documents at the end of this report

  4. Guide for prioritizing power plant productivity improvement projects: handbook of availability improvement methodology

    International Nuclear Information System (INIS)

    1981-01-01

    As part of its program to help improve electrical power plant productivity, the Department of Energy (DOE) has developed a methodology for evaluating productivity improvement projects. This handbook presents a simplified version of this methodology called the Availability Improvement Methodology (AIM), which provides a systematic approach for prioritizing plant improvement projects. Also included in this handbook is a description of data taking requirements necessary to support the AIM methodology, benefit/cost analysis, and root cause analysis for tracing persistent power plant problems. In applying the AIM methodology, utility engineers should be mindful that replacement power costs are frequently greater for forced outages than for planned outages. Equivalent availability includes both. A cost-effective ranking of alternative plant improvement projects must discern between those projects which will reduce forced outages and those which might reduce planned outages. As is the case with any analytical procedure, engineering judgement must be exercised with respect to results of purely mathematical calculations

  5. Development of wind power production in arctic climate

    Energy Technology Data Exchange (ETDEWEB)

    Peltola, E.; Kaas, J.; Aarnio, E. [Kemijoki Oy (Finland)

    1998-10-01

    The project Development of wind power production in arctic climate is a direct continuation of Arctic wind energy research project, which started in 1989. The main topics in 1996-97 have been production development and commercialising the blade heating systems, development of operation and maintenance practices of arctic wind power plants, preparations for new wind farms and various network connection and energy system studies. Practical operations have taken place in Pyhaetunturi test power plant and in Paljasselkae and Lammashovi power plants, which are in commercial operation

  6. Inclined solar chimney for power production

    International Nuclear Information System (INIS)

    Panse, S.V.; Jadhav, A.S.; Gudekar, A.S.; Joshi, J.B.

    2011-01-01

    Highlights: → Solar energy harnessing using inclined face of high mountains as solar chimney. → Solar chimneys with structural stability, ease of construction and lower cost. → Mathematical model developed, using complete (mechanical and thermal) energy balance. → Can harness wind power also, as wind velocities at mountain top add to power output. → Air temperature and velocity increase, as air rises in inclined chimney. - Abstract: The present concept of solar chimney is a tall vertical chimney constructed at the center of a large area, which is the collector. This creates questions about stability and economic viability of the chimney and also demands elaborate engineering techniques for constructing a tall chimney. We suggest geometry of 'Inclined Solar Chimney' (ISC), which is constructed along the face of a high rising mountain, on which maximum solar insolation is incident throughout the year. The chimney and the collector get merged here. This makes the structure stable, cost effective and easy for construction. A mathematical model has been developed considering the total energy balance. It predicts the temperature and velocity and kinetic power of the emerging air draft for some chosen values of other parameters. The model also shows the proportion in which absorbed solar energy is divided into different forms, and hence predicts the dependence of kinetic of emerging air draft upon dimensions of the chimney and properties of materials used. Further, it is shown that external winds enhance the kinetic power of the emerging air. Thus ISC can also harness the wind energy, available at the top of the mountain.

  7. Electric power production contra electricity savings

    International Nuclear Information System (INIS)

    Schleisner, L.; Grohnheit, P.E.; Soerensen, H.

    1991-01-01

    The expansion of electricity-producing plants has, in Denmark until now, taken place in accordance with the demand for electricity. Recently, it has been suggested that the cost of the further development of such systems is greater than the cost of instigating and carrying out energy conservation efforts. The aim of the project was to evaluate the consequences for power producing plants of a reduction of the electricity consumption of end-users. A method for the analysis of the costs involved in the system and operation of power plants contra the costs that are involved in saving electricity is presented. In developing a model of this kind, consideration is given to the interplay of the individual saving project and the existing or future electricity supply. Thus it can be evaluated to what extent it would be advisable to substitute investments in the development of the capacity of the power plants with investments in the reduction of electricity consumption by the end users. This model is described in considerable detail. It will be tested in representative situations and locations throughout the Nordic countries. (AB) 17 refs

  8. 76 FR 15307 - Notice of Staff Attendance at Southwest Power Pool Strategic Planning Committee Meeting

    Science.gov (United States)

    2011-03-21

    ... Power Pool Strategic Planning Committee Meeting The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meeting of the Southwest Power Pool, Inc. (SPP) Strategic Planning Committee (SPC), as noted below. Their attendance is part of the Commission's ongoing outreach...

  9. Enhanced Simulated Annealing for Solving Aggregate Production Planning

    Directory of Open Access Journals (Sweden)

    Mohd Rizam Abu Bakar

    2016-01-01

    Full Text Available Simulated annealing (SA has been an effective means that can address difficulties related to optimisation problems. SA is now a common discipline for research with several productive applications such as production planning. Due to the fact that aggregate production planning (APP is one of the most considerable problems in production planning, in this paper, we present multiobjective linear programming model for APP and optimised by SA. During the course of optimising for the APP problem, it uncovered that the capability of SA was inadequate and its performance was substandard, particularly for a sizable controlled APP problem with many decision variables and plenty of constraints. Since this algorithm works sequentially then the current state will generate only one in next state that will make the search slower and the drawback is that the search may fall in local minimum which represents the best solution in only part of the solution space. In order to enhance its performance and alleviate the deficiencies in the problem solving, a modified SA (MSA is proposed. We attempt to augment the search space by starting with N+1 solutions, instead of one solution. To analyse and investigate the operations of the MSA with the standard SA and harmony search (HS, the real performance of an industrial company and simulation are made for evaluation. The results show that, compared to SA and HS, MSA offers better quality solutions with regard to convergence and accuracy.

  10. A capacity expansion planning model for integrated water desalination and power supply chain problem

    International Nuclear Information System (INIS)

    Saif, Y.; Almansoori, A.

    2016-01-01

    Highlights: • Water and power supply chain is considered by a discrete optimization model. • The model examines the capacity expansion and operation of the supply chain problem. • Renewable/alternative power technologies and carbon mitigation are considered. • A case study of Abu Dhabi in UAE is examined as an application of the model. - Abstract: Cogeneration of water and power in integrated cogeneration production plants is a common practice in the Middle East and North Africa (MENA) countries. There are several combinations of water desalination and power technologies which give significant adverse environmental impact. Renewable and alternative energy technologies have been recently proposed as alternative power production paths in the water and power sector. In this study, we examine the optimal capacity expansion of water and power infrastructure over an extended planning horizon. A generic mixed integer linear programming model is developed to assist in the decision making process on: (1) optimal installation of cogeneration expansion capacities; (2) optimal installation of renewable and alternative power plants; (3) optimal operation of the integrated water and power supply chain over large geographical areas. Furthermore, the model considers the installation of carbon capture methods in fossil-based power plants. A case study will be presented to illustrate the mathematical programming application for the Emirate of Abu Dhabi (AD) in the United Arab Emirates (UAE). The case study is solved reflecting different scenarios: base case scenario, integration of renewable and alternative technologies scenario, and CO_2 reduction targets scenario. The results show that increased carbon tax values up to 150 $/ton-CO_2 gives a maximum 3% cost increase for the supply chain net present value. The installation of carbon capture methods is not an economical solution due to its high operation energy requirements in the order of 370 kW h per ton of captured CO_2

  11. Power Curve Measurements, quantify the production increase

    DEFF Research Database (Denmark)

    Gómez Arranz, Paula; Vesth, Allan

    The purpose of this report is to quantify the production increase on a given turbine with respect to another given turbine. The used methodology is the “side by side” comparison method, provided by the client. This method involves the use of two neighboring turbines and it is based...

  12. Power Production Management of Three Gorges Project

    Institute of Scientific and Technical Information of China (English)

    Zhang Cheng

    2010-01-01

    @@ The Three Gorges Hydropower Plant is the one with the largest installed capacity in the world today and has a decisive and important influence upon the security of the national power grids. It has been operated stably and supplied the East China, Central China, South China,Sichuan and Chongqing with clean renewable energy. This paper presents the management of the project's dispatch, operation and maintenance and puts forward new ideas and new methods for the plant management, which may provide valuable references for the operation of oversized hydropower plants.

  13. Power Production Management of Three Gorges Project

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    The Three Gorges Hydropower Plant is the one with the largest installed capacity in the world today and has a decisive and important influence upon the security of the national power grids. It has been operated stably and supplied the East China, Central China, South China, Sichuan and Chongqing with clean renewable energy. This paper presents the management of the project’s dispatch, operation and maintenance and puts forward new ideas and new methods for the plant management, which may provide valuable re...

  14. The interplay of governance, power and citizen participation in community tourism planning

    Science.gov (United States)

    E.J. Jordan; C.A. Vogt; Linda Kruger; N. Grewe

    2013-01-01

    This research examines a unique case of tourism planning and explores the relationships between governance, power, and citizen participation in community decision-making. In less than two years, the community of Sitka, Alaska, undertook two separate tourism-planning processes in response to proposed tourism development. The first plan followed a participant-led...

  15. Safety of power transformers, power supplies, reactors and similar products - Part 1: General requirements and tests

    CERN Document Server

    International Electrotechnical Commission. Geneva

    1998-01-01

    This International Standard deals with safety aspects of power transformers, power supplies, reactors and similar products such as electrical, thermal and mechanical safety. This standard covers the following types of dry-type transformers, power supplies, including switch mode power supplies, and reactors, the windings of which may be encapsulated or non-encapsulated. It has the status of a group safety publication in accordance with IEC Guide 104.

  16. Plans for wind power in Norway - Enova's perspective

    International Nuclear Information System (INIS)

    Stensaas, Dag Rune

    2006-01-01

    A brief presentation of Enova's view on wind power development in Norway. Enova supports a continued development of wind power combined with the development of district heating, as well as other measures to reduce energy consumption (ml)

  17. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    International Nuclear Information System (INIS)

    1984-01-01

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables

  18. Power Ultrasound to Process Dairy Products

    Science.gov (United States)

    Bermúdez-Aguirre, Daniela; Barbosa-Cánovas, Gustavo V.

    Conventional methods of pasteurizing milk involve the use of heat regardless of treatment (batch, high temperature short time - HTST or ultra high temperature - UHT sterilization), and the quality of the milk is affected because of the use of high temperatures. Consequences of thermal treatment are a decrease in nutritional properties through the destruction of vitamins or denaturation of proteins, and sometimes the flavor of milk is undesirably changed. These changes are produced at the same time that the goal of the pasteurization process is achieved, which is to have a microbiological safe product, free of pathogenic bacteria, and to reduce the load of deteriorative microorganisms and enzymes, resulting in a product with a longer storage life.

  19. USGS QA Plan: Certification of digital airborne mapping products

    Science.gov (United States)

    Christopherson, J.

    2007-01-01

    To facilitate acceptance of new digital technologies in aerial imaging and mapping, the US Geological Survey (USGS) and its partners have launched a Quality Assurance (QA) Plan for Digital Aerial Imagery. This should provide a foundation for the quality of digital aerial imagery and products. It introduces broader considerations regarding processes employed by aerial flyers in collecting, processing and delivering data, and provides training and information for US producers and users alike.

  20. Connected vehicle impacts on transportation planning technical memorandum #2 : connected vehicle planning processes and products and stakeholder roles and responsibilities.

    Science.gov (United States)

    2015-01-01

    The objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should : be considered across the range of transportation planning processes and products developed by Stat...

  1. Analysis and planning of the utilization of nuclear power plants

    International Nuclear Information System (INIS)

    Skvarka, P.

    1985-01-01

    The utilization coefficient as one of the characteristics of availability of nuclear power plants and the operation results (like maximum power, block number, and electric energy generation) are investigated by different statistic methods for several nuclear power plants with PWR type reactors and compared with those of WWER 440-type reactors. By means of linear many-parameter regression analysis the utilization coefficient is studied in dependence on block power and time after reactor commissioning. Forecastings of mean utilization coefficients are presented for the power of WWER 1000-type reactors

  2. Library orientation on videotape: production planning and administrative support.

    Science.gov (United States)

    Shedlock, J; Tawyea, E W

    1989-01-01

    New student-faculty-staff orientation is an important public service in a medical library and demands creativity, imagination, teaching skill, coordination, and cooperation on the part of public services staff. The Northwestern University Medical Library (NUML) implemented a video production service in the spring of 1986 and used the new service to produce an orientation videotape for incoming students, new faculty, and medical center staff. Planning is an important function in video production, and the various phases of outlining topics, drafting scripts, matching video sequences, and actual taping of video, voice, and music are described. The NUML orientation videotape demonstrates how reference and audiovisual services merge talent and skills to benefit the library user. Videotape production, however, cannot happen in a vacuum of good intentions and high ideals. This paper also presents the management support and cost analysis needed to make video production services a reality for use by public service departments.

  3. A model for marketing planning of new products

    DEFF Research Database (Denmark)

    Martensen, Anne

    1994-01-01

    Executive Summary: 1. A model for forecasting the sales of a new product is presented. This model allows to predict the sales development of a new product before it is actually launched on the market. 2. The model makes separate forecasts for the volume of trial and repeat purchases. It also...... incorporates a special model to explain consumer awareness of the new product. 3. Consumer awareness is explained by distribution (shelf facings and in-store promotion), advertising and giving away free samples. 4. The trial model incorporates the total market potential, the probability of being in a buying...... the product after some time. 6. The model requires three types of data input: market data, market research data, and marketing plan data. Using these data, prediction can be made by a user-friendly PC programme. 7. An example is shown demonstrating that the predictions made by the model were in good...

  4. Improving productivity and firm performance with enterprise resource planning

    Science.gov (United States)

    Beheshti, Hooshang M.; Beheshti, Cyrus M.

    2010-11-01

    Productivity is generally considered to be the efficient utilisation of organisational resources and is measured in terms of the efficiency of a worker, company or nation. Focusing on efficiency alone, however, can be harmful to the organisation's long-term success and competitiveness. The full benefits of productivity improvement measures are realised when productivity is examined from two perspectives: operational efficiency (output/input) of an individual worker or a business unit as well as performance (effectiveness) with regard to end user or customer satisfaction. Over the years, corporations have adopted new technology to integrate business activities in order to achieve both effectiveness and efficiency in their operations. In recent years, many firms have invested in enterprise resource planning (ERP) in order to integrate all business activities into a uniform system. The implementation of ERP enables the firm to reduce the transaction costs of the business and improve its productivity, customer satisfaction and profitability.

  5. PROMOTION OF PRODUCTS AND ANALYSIS OF MARKET OF POWER TOOLS

    Directory of Open Access Journals (Sweden)

    Sergey S. Rakhmanov

    2014-01-01

    Full Text Available The article describes the general situation of power tools on the market, both in Russia and in the world. A comparative analysis of competitors, market structure analysis of power tools, as well as assessment of competitiveness of some major product lines. Also the analysis methods of promotion used by companies selling tools, competitive analysis range Bosch, the leader in its segment, power tools available on the market in Russia.

  6. Visual Grouping in Accordance With Utterance Planning Facilitates Speech Production

    Directory of Open Access Journals (Sweden)

    Liming Zhao

    2018-03-01

    Full Text Available Research on language production has focused on the process of utterance planning and involved studying the synchronization between visual gaze and the production of sentences that refer to objects in the immediate visual environment. However, it remains unclear how the visual grouping of these objects might influence this process. To shed light on this issue, the present research examined the effects of the visual grouping of objects in a visual display on utterance planning in two experiments. Participants produced utterances of the form “The snail and the necklace are above/below/on the left/right side of the toothbrush” for objects containing these referents (e.g., a snail, a necklace and a toothbrush. These objects were grouped using classic Gestalt principles of color similarity (Experiment 1 and common region (Experiment 2 so that the induced perceptual grouping was congruent or incongruent with the required phrasal organization. The results showed that speech onset latencies were shorter in congruent than incongruent conditions. The findings therefore reveal that the congruency between the visual grouping of referents and the required phrasal organization can influence speech production. Such findings suggest that, when language is produced in a visual context, speakers make use of both visual and linguistic cues to plan utterances.

  7. Visual Grouping in Accordance With Utterance Planning Facilitates Speech Production.

    Science.gov (United States)

    Zhao, Liming; Paterson, Kevin B; Bai, Xuejun

    2018-01-01

    Research on language production has focused on the process of utterance planning and involved studying the synchronization between visual gaze and the production of sentences that refer to objects in the immediate visual environment. However, it remains unclear how the visual grouping of these objects might influence this process. To shed light on this issue, the present research examined the effects of the visual grouping of objects in a visual display on utterance planning in two experiments. Participants produced utterances of the form "The snail and the necklace are above/below/on the left/right side of the toothbrush" for objects containing these referents (e.g., a snail, a necklace and a toothbrush). These objects were grouped using classic Gestalt principles of color similarity (Experiment 1) and common region (Experiment 2) so that the induced perceptual grouping was congruent or incongruent with the required phrasal organization. The results showed that speech onset latencies were shorter in congruent than incongruent conditions. The findings therefore reveal that the congruency between the visual grouping of referents and the required phrasal organization can influence speech production. Such findings suggest that, when language is produced in a visual context, speakers make use of both visual and linguistic cues to plan utterances.

  8. Natural gas for power production in Western Europe

    International Nuclear Information System (INIS)

    1993-01-01

    The third and last part of the Sub-Committee's study on natural gas for power generation is reprinted in this issue. This part addresses gas consumption in electricity production until the year 2010. The first part of the study dealing with combined cycle power plants was published in September and the 2nd part on regulatory and environmental issues in October 1992

  9. Original theatrical production will explore issues surrounding nuclear power

    OpenAIRE

    Elliott, Jean

    2007-01-01

    A new, original theatrical production entitled "Nuclear Power Play" will explore the personal and public politics of nuclear power. Uniquely developed by a team of experts in science and technology working alongside theatre arts practitioners, the play will debut on Wednesday, Nov. 7 at 7:30 p.m. in the Haymarket Theatre at the Squires Student Center on the Virginia Tech campus.

  10. Experience in independent power production: Two projects that closed

    Energy Technology Data Exchange (ETDEWEB)

    Kappaz, M.H.

    1994-12-31

    K and M Engineering and Consulting Corporation`s experience in independent power production is outlined. The following topics are discussed: the KMR Power Corporation, K and M strengths and strategy, key success factors, project experience, selected projects, and capital structure.

  11. Implications of sustainability assessment for electricity system design: The case of the Ontario Power Authority's integrated power system plan

    International Nuclear Information System (INIS)

    Winfield, Mark; Gibson, Robert B.; Markvart, Tanya; Gaudreau, Kyrke; Taylor, Jennifer

    2010-01-01

    This paper explores the results and implications of an illustrative application of a sustainability assessment framework in the design and evaluation of a major integrated power system plan. The paper examines the integrated power system plan developed by the Ontario Power Authority in 2007. The basic framework rests on a generic set of evaluation criteria reflecting basic requirements for progress towards sustainability that was adopted, reinterpreted and applied by the Authority in support of its proposed plan. In response to evident deficiencies in the Authority's work, the authors and colleagues undertook a re-examination using a more fully elaborated sustainability assessment framework, specified for application to power system planning. The results point to a plan and plan components substantially different from those proposed by the Authority. More generally, the results highlight three advantages of applying such a sustainability assessment framework: comprehensive coverage of key requirements for progress towards sustainability while ensuring careful attention to the context and concerns of the sector; emphasis on identifying plan options that avoid major trade-offs among the sustainability criteria and recognition of interactions among the social, ecological, economic and technological realms favouring options that offer multiple, mutually reinforcing and lasting benefits.

  12. Point Climat no. 21 'Regional wind power plans: is there enough wind to reach the Grenelle wind power targets?'

    International Nuclear Information System (INIS)

    Bordier, Cecile; Charentenay, Jeremie de

    2012-01-01

    Among the publications of CDC Climat Research, 'Climate Briefs' presents, in a few pages, hot topics in climate change policy. This issue addresses the following points: Regional wind power plans assess the wind power development potential of every French region. The aggregate regional potential largely exceeds national targets for 2020. However, achieving these targets is still far from guaranteed: the forecasted potential is theoretical, and the issues involved in implementing wind power projects on the ground will likely reduce this potential

  13. Improvement of uranium production efficiency to meet China's nuclear power requirements

    International Nuclear Information System (INIS)

    Zhang, R.

    1997-01-01

    Recently China put the Qinshan Nuclear Power Plant, with an installed capacity of 300 MW, in the province of Zhejiang and the Daya Bay Nuclear Power Plant, with a total installed capacity of 2 x 900 MW, in commercial operation. China plans a rapid growth in nuclear power from 1995 to 2010. China's uranium production will therefore also enter a new period with nuclear power increasing. In order to meet the demand of nuclear power for uranium special attention has been paid to both technical progress improvement using management with the aim of reducing the cost of uranium production. The application of the trackless mining technique has enhanced the uranium mining productivity significantly. China has produced a radiometric sorter, model 5421-2 for pre-concentrating uranium run-of-mine ore. This effectively increases the uranium content in mill feed and decreases the operating cost of hydrometallurgical treatment. The in situ leach technique after blasting is applied underground in the Lantian Mine, in addition to the surface heap leaching, and has obtained a perfect result. The concentrated acid-curing, and ferric sulphate trickle leaching process, will soon be used in commercial operation for treating uranium ore grading -5 to -7 mm in size. The annual production capability of the Yining Mine will be extended to 100 tonnes U using improving in situ leaching technology. For the purpose of improving the uranium production efficiency much work has been done optimizing the distribution of production centres. China plans to expand its uranium production to meet the uranium requirements of the developing nuclear power plants. (author). 4 tabs

  14. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  15. Approach for planning and operation of energy-efficient production systems; Vorgehensweise fuer Planung und Betrieb energieeffizienter Produktionssysteme

    Energy Technology Data Exchange (ETDEWEB)

    Weinert, Nils

    2010-07-02

    The integration of energy efficiency criteria into planning and operating of production systems substantially contributes to resource productivity and thus is an essential prerequisite for global sustainable development. Great potential can be identified for an early consideration of energy efficiency measures in an early planning phase. It is necessary to determine energy requirements during the planning process before the system is implemented. The objective of this thesis is the development of a planning system for the detailed prognosis of a production system's energy consumption. A concept is derived, by which a time based prediction of the amount of energy required by each machine and thus by the whole production system becomes possible. The planning system is methodologically integrated with well established approaches for manufacturing and factory planning. The methodology is based on the separation of production processes into segments, each with specific energy consumption. These segments, which are defined for equipment according to the possible operational states, are called EnergyBlocks. Each EnergyBlock describes the energy consumed and has a fixed or variable duration. A fixed duration results from operational states which last the shortest time technically possible, for example a machine start process. Variable durations represent operational states, whose length are dependant of the production task. Examples are manufacturing processes. The energy consumption of one block is mathematically described using power series. The energy consumption profile of a planned, not yet realized production process is modeled by arranging the EnergyBlocks to sequences. Depending on when the developed planning system is applied in the process of manufacturing and factory planning, energy consumption prognosis can be calculated as a power profile or as total consumption values, using the same model for both cases. Thus, the information density can be chosen

  16. Social power, product conspicuousness, and the demand for luxury brand counterfeit products.

    Science.gov (United States)

    Bian, Xuemei; Haque, Sadia; Smith, Andrew

    2015-03-01

    The aim of this article is twofold: (1) to achieve a better understanding of the psychological determinants of the demand for luxury brand counterfeit products (LBCP) through exploring the effects of social power; (2) to extend power literature by identifying boundary conditions of the relationship between social power and compensatory consumption identified by Rucker and Galinsky (2008, J. Consum. Res., 35, 257-267) and Rucker and Galinsky (2009, J. Exp. Soc. Psychol., 45, 549-555). Findings from three experiments demonstrate that social power holds key insights into understanding consumers' purchase propensity for LBCP; product conspicuousness moderates the effects of social power on purchase propensity for status products; these moderation effects are only observed when the status products are LBCP but not genuine products. This article, therefore, contributes to the literature regarding the demand for counterfeits as well as the social power and compensatory consumption literature. © 2014 The British Psychological Society.

  17. System Evaluation and Economic Analysis of a HTGR Powered High-Temperature Electrolysis Hydrogen Production Plant

    International Nuclear Information System (INIS)

    McKellar, Michael G.; Harvego, Edwin A.; Gandrik, Anastasia A.

    2010-01-01

    A design for a commercial-scale high-temperature electrolysis (HTE) plant for hydrogen production has been developed. The HTE plant is powered by a high-temperature gas-cooled reactor (HTGR) whose configuration and operating conditions are based on the latest design parameters planned for the Next Generation Nuclear Plant (NGNP). The current HTGR reference design specifies a reactor power of 600 MWt, with a primary system pressure of 7.0 MPa, and reactor inlet and outlet fluid temperatures of 322 C and 750 C, respectively. The power conversion unit will be a Rankine steam cycle with a power conversion efficiency of 40%. The reference hydrogen production plant operates at a system pressure of 5.0 MPa, and utilizes a steam-sweep system to remove the excess oxygen that is evolved on the anode (oxygen) side of the electrolyzer. The overall system thermal-to-hydrogen production efficiency (based on the higher heating value of the produced hydrogen) is 40.4% at a hydrogen production rate of 1.75 kg/s and an oxygen production rate of 13.8 kg/s. An economic analysis of this plant was performed with realistic financial and cost estimating assumptions. The results of the economic analysis demonstrated that the HTE hydrogen production plant driven by a high-temperature helium-cooled nuclear power plant can deliver hydrogen at a cost of $3.67/kg of hydrogen assuming an internal rate of return, IRR, of 12% and a debt to equity ratio of 80%/20%. A second analysis shows that if the power cycle efficiency increases to 44.4%, the hydrogen production efficiency increases to 42.8% and the hydrogen and oxygen production rates are 1.85 kg/s and 14.6 kg/s respectively. At the higher power cycle efficiency and an IRR of 12% the cost of hydrogen production is $3.50/kg.

  18. Optimal Capacity Proportion and Distribution Planning of Wind, Photovoltaic and Hydro Power in Bundled Transmission System

    Science.gov (United States)

    Ye, X.; Tang, Q.; Li, T.; Wang, Y. L.; Zhang, X.; Ye, S. Y.

    2017-05-01

    The wind, photovoltaic and hydro power bundled transmission system attends to become common in Northwest and Southwest of China. To make better use of the power complementary characteristic of different power sources, the installed capacity proportion of wind, photovoltaic and hydro power, and their capacity distribution for each integration node is a significant issue to be solved in power system planning stage. An optimal capacity proportion and capacity distribution model for wind, photovoltaic and hydro power bundled transmission system is proposed here, which considers the power out characteristic of power resources with different type and in different area based on real operation data. The transmission capacity limit of power grid is also considered in this paper. Simulation cases are tested referring to one real regional system in Southwest China for planning level year 2020. The results verify the effectiveness of the model in this paper.

  19. 76 FR 81487 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-12-28

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project Post-2017 Remarketing AGENCY... . Information regarding Western's BCP Post-2017 marketing efforts, the Energy Management and Planning Program... Proposals. SUMMARY: The Western Area Power Administration (Western), a Federal power marketing agency of the...

  20. Effective Heuristics for Capacitated Production Planning with Multiperiod Production and Demand with Forecast Band Refinement

    OpenAIRE

    Philip Kaminsky; Jayashankar M. Swaminathan

    2004-01-01

    In this paper we extend forecast band evolution and capacitated production modelling to the multiperiod demand case. In this model, forecasts of discrete demand for any period are modelled as bands and defined by lower and upper bounds on demand, such that future forecasts lie within the current band. We develop heuristics that utilize knowledge of demand forecast evolution to make production decisions in capacitated production planning environments. In our computational study we explore the ...

  1. Particular intervention plan of The Bugey Nuclear Power Plant

    International Nuclear Information System (INIS)

    2014-01-01

    The Particular intervention plan (PPI in French) is an emergency plan which foresees the measures and means to be implemented to address the potential risks of the presence and operation of a nuclear facility. This plan is implemented and developed by the Prefect in case of nuclear accident (or incident leading to a potential accident), the impact of which extending beyond the facility perimeter. It represents a special section of the organisation plan for civil protection response (ORSEC plan). The PPI foresees the necessary measures and means for crisis management during the first hours following the accident and is triggered by the Department Prefect according to the information provided by the facility operator. Its aim is to protect the populations leaving within 10 km of the facility against a potential radiological hazard. The PPI describes: the facility, the intervention area, the protection measures for the population, the conditions of emergency plan triggering, the crisis organisation, the action forms of the different services, and the post-accident stage. This document is the public version of the Particular intervention plan of the Bugey NPP (Ain, France)

  2. Particular intervention plan of the Flamanville Nuclear Power Plant

    International Nuclear Information System (INIS)

    2008-01-01

    The Particular intervention plan (PPI in French) is an emergency plan which foresees the measures and means to be implemented to address the potential risks of the presence and operation of a nuclear facility. This plan is implemented and developed by the Prefect in case of nuclear accident (or incident leading to a potential accident), the impact of which extending beyond the facility perimeter. It represents a special section of the organisation plan for civil protection response (ORSEC plan). The PPI foresees the necessary measures and means for crisis management during the first hours following the accident and is triggered by the Department Prefect according to the information provided by the facility operator. Its aim is to protect the populations leaving within 10 km of the facility against a potential radiological hazard. The PPI describes: the facility, the intervention area, the protection measures for the population, the conditions of emergency plan triggering, the crisis organisation, the action forms of the different services, and the post-accident stage. This document is the public version of the Particular intervention plan of the Flamanville NPP (Manche, France)

  3. Biomass power production in Amazonia: Environmentally sound, economically productive

    Energy Technology Data Exchange (ETDEWEB)

    Waddle, D.B. [National Rural Electric Cooperative Association, Washington, DC (United States); Hollomon, J.B. [Winrock International Institute for Agricultural Development, Arlington, VA (United States)

    1993-12-31

    With the support of the US Agency for International Development, the National Rural Electric Cooperative Association (NRECA) is assisting their utility counterparts in Bolivia to improve electric service in the country`s rural population. In remote areas, the cost of extending transmission lines to small communities is prohibitive, and diesel generators represent an expensive alternative, especially for baseload power. This has led to serious consideration of electric generating systems using locally available renewable resources, including biomass, hydro, wind, and solar energy. A project has recently been initiated in Riberalta, in the Amazonian region of Bolivia, to convert waste Brazil nut shells and sawmill residues to electricity. Working in tandem with diesel generators, the biomass-fired plant will produce base-load power in an integrated system that will be able to provide reliable and affordable electricity to the city. The project will allow the local rural electric cooperative to lower the price of electricity by nearly forty percent, enable the local Brazil nut industry to increase its level of mechanization, and reduce the environmental impacts of dumping waste shells around the city and in an adjacent river. The project is representative of others that will be funded in the future by NRECA/AID.

  4. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GiS) mbH, Weinheim (Germany)

    2014-05-15

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  5. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  6. Facility Effluent Monitoring Plan for the 284-E and 284-W power plants

    International Nuclear Information System (INIS)

    Herman, D.R.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP- 0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years. The 284-E and 284-W Power Plants are coal-fired plants used to generate steam. Electricity is not generated at these facilities. The maximum production of steam is approximately 159 t (175 tons)/h at 101 kg (225 lb)/in 2 . Steam generated at these facilities is used in other process facilities (i. e., the B Plant, Plutonium-Uranium Extraction Plant, 242-A Evaporator) for heating and process operations. The functions or processes associated with these facilities do not have the potential to generate radioactive airborne effluents or radioactive liquid effluents, therefore, radiation monitoring equipment is not used on the discharge of these streams. The functions or processes associated with the production of steam result in the use, storage, management and disposal of hazardous materials

  7. Can Differentiated Production Planning and Control enable both Responsiveness and Efficiency in Food Production?

    Directory of Open Access Journals (Sweden)

    Anita Romsdal

    2014-07-01

    Full Text Available This paper addresses the complex production planning and control (PPC challenges in food supply chains. The study illustrates how food producers' traditional make‐to‐stock (MTS approach is not well suited to meet the trends of increasing product variety, higher demand uncertainty, increasing sales of fresh food products and more demanding customers. The paper proposes a framework for differentiated PPC that combines MTS with make‐to‐order (MTO.The framework matches products with the most appropriate PPC approaches and buffering techniques depending on market and product characteristics. The core idea is to achieve more volume flexibility in the production system by exploiting favourable product and market characteristics (high demand predictability, long customer order leadtime allowances and low product perishability. A case study is used to demonstrate how the framework can enable food producers to achieve efficiency in production, inventory and PPC processes – and simultaneously be responsive to market requirements.

  8. Planning of optimum production from a natural gas field

    Energy Technology Data Exchange (ETDEWEB)

    Van Dam, J

    1968-03-01

    The design of an optimum development plan for a natural gas field always depends on the typical characteristics of the producing field, as well as those of the market to be served by this field. Therefore, a good knowledge of the field parameters, such as the total natural gas reserves, the well productivity, and the dependence of production rates on pipeline pressure and depletion of natural gas reserves, is required prior to designing the development scheme of the field, which in fact depends on the gas-sales contract to be concluded in order to commit the natural gas reserves to the market. In this paper these various technical parameters are discussed in some detail, and on this basis a theoretical/economical analysis of natural gas production is given. For this purpose a simplified economical/mathematical model for the field is proposed, from which optimum production rates at various future dates can be calculated. The results of these calculations are represented in a dimensionless diagram which may serve as an aid in designing optimum development plans for a natural gas field. The use of these graphs is illustrated in a few examples.

  9. Optimal Control Approaches to the Aggregate Production Planning Problem

    Directory of Open Access Journals (Sweden)

    Yasser A. Davizón

    2015-12-01

    Full Text Available In the area of production planning and control, the aggregate production planning (APP problem represents a great challenge for decision makers in production-inventory systems. Tradeoff between inventory-capacity is known as the APP problem. To address it, static and dynamic models have been proposed, which in general have several shortcomings. It is the premise of this paper that the main drawback of these proposals is, that they do not take into account the dynamic nature of the APP. For this reason, we propose the use of an Optimal Control (OC formulation via the approach of energy-based and Hamiltonian-present value. The main contribution of this paper is the mathematical model which integrates a second order dynamical system coupled with a first order system, incorporating production rate, inventory level, and capacity as well with the associated cost by work force in the same formulation. Also, a novel result in relation with the Hamiltonian-present value in the OC formulation is that it reduces the inventory level compared with the pure energy based approach for APP. A set of simulations are provided which verifies the theoretical contribution of this work.

  10. Large-scale utilization of wind power in China: Obstacles of conflict between market and planning

    International Nuclear Information System (INIS)

    Zhao Xiaoli; Wang Feng; Wang Mei

    2012-01-01

    The traditional strict planning system that regulates China's power market dominates power industry operations. However, a series of market-oriented reforms since 1997 call for more decentralized decision-making by individual market participants. Moreover, with the rapid growth of wind power in China, the strict planning system has become one of the significant factors that has curtailed the generation of wind power, which contradicts with the original purpose of using the government's strong control abilities to promote wind power development. In this paper, we first present the reasons why market mechanisms are important for large-scale utilization of wind power by using a case analysis of the Northeast Grid, and then we illustrate the impact of conflicts between strict planning and market mechanisms on large-scale wind power utilization. Last, we explore how to promote coordination between markets and planning to realize large-scale wind power utilization in China. We argue that important measures include implementing flexible power pricing mechanisms instead of the current fixed pricing approach, formulating a more reasonable mechanism for distributing benefits and costs, and designing an appropriate market structure for large-scale wind power utilization to promote market liquidity and to send clear market equilibrium signals. - Highlights: ► We present the reasons why market is important for utilization of wind power. ► We discuss the current situation of the conflict between planning and market. ► We study the impact of conflict between planning and market on wind power output. ► We argue how to promote coordination between market and planning.

  11. Green certificates will lead to increased electric power production

    International Nuclear Information System (INIS)

    Lind, Oddvar

    2004-01-01

    The implementation of green certificates will lead to increased electricity production from renewable energy sources and less risk of price crises. For the time being, a common market for green certificates will be established with Sweden from January 1, 2006. It is possible to realise a ''compulsory total quota'' of 20 TWh by 2016. Green certificates will imply a premium on the electricity bill. However, the quota system will imply increased power generation, which in turn tends to lower the price. Norway should in principle follow Sweden's definition of renewable energy: all new hydroelectric power, wind power, solar energy, wave and tidal power, biomass energy, and energy recovery. The certificate regime will apply to new investments in renewable power production. However, it would be natural to include the established renewable power production that is currently receiving support. Some critics fear that the consumers rather than the authorities will subsidize the production of green power. The point is being made that central EU countries may save great sums by investing in renewable energy in Norway

  12. Equipment acquisition plans for the SSCL magnet excitation power system

    International Nuclear Information System (INIS)

    Winje, R.

    1993-05-01

    This report gives a brief description of the major electrical technical equipment used in the Superconducting Super Collider accelerators systems and the present laboratory plans for the acquisition of the equipment

  13. Wind power installations in Switzerland - Regional planning basics and impact

    International Nuclear Information System (INIS)

    Ott, W.; Kaufmann, Y.; Steiner, P.; Gilgen, K.; Sartoris, A.

    2008-01-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at the basics of regional planning and its impact on the construction of wind-energy installations in Switzerland. The authors state that the planning and realisation of wind turbine installations is often time and resource consuming: this document presents and discusses the results obtained in a project that aimed to supply consolidated knowledge on project-relevant basics and their effect with respect to wind-energy installations. Experience gained in Switzerland and in other countries is discussed. This report on the basics of wind-energy planning with its detailed information formed the basis of a checklist described in a further report. In nine chapters, regional planning aspects, environment and landscape-relevant aspects, effects on the national and regional economies and social acceptance factors are discussed. Also, success-factors and possible solutions for the successful realisation of wind-energy projects are looked at.

  14. An Improved Harmony Search Algorithm for Power Distribution Network Planning

    Directory of Open Access Journals (Sweden)

    Wei Sun

    2015-01-01

    Full Text Available Distribution network planning because of involving many variables and constraints is a multiobjective, discrete, nonlinear, and large-scale optimization problem. Harmony search (HS algorithm is a metaheuristic algorithm inspired by the improvisation process of music players. HS algorithm has several impressive advantages, such as easy implementation, less adjustable parameters, and quick convergence. But HS algorithm still has some defects such as premature convergence and slow convergence speed. According to the defects of the standard algorithm and characteristics of distribution network planning, an improved harmony search (IHS algorithm is proposed in this paper. We set up a mathematical model of distribution network structure planning, whose optimal objective function is to get the minimum annual cost and constraint conditions are overload and radial network. IHS algorithm is applied to solve the complex optimization mathematical model. The empirical results strongly indicate that IHS algorithm can effectively provide better results for solving the distribution network planning problem compared to other optimization algorithms.

  15. Optimization of wind farm power production using innovative control strategies

    DEFF Research Database (Denmark)

    Duc, Thomas

    Wind energy has experienced a very significant growth and cost reduction over the past decade, and is now able to compete with conventional power generation sources. New concepts are currently investigated to decrease costs of production of electricity even further. Wind farm coordinated control...... deficit caused by the wake downstream, or yawing the turbine to deflect the wake away from the downwind turbine. Simulation results found in the literature indicate that an increase in overall power production can be obtained. However they underline the high sensitivity of these gains to incoming wind...... aligned wind turbines. The experimental results show that the scenarios implemented during the first measurement campaign did not achieve an increase in overall power production, which confirms the difficulty to realize wind farm power optimization in real operating conditions. In the curtailment field...

  16. Estimating generation costs for wind power production in France

    International Nuclear Information System (INIS)

    Benazet, J.F.; Probert, E.J.

    1997-01-01

    Wind power is being exploited in several European countries as one of a possible number of sources of renewable energy. However, in France there is a heavy reliance on nuclear and hydro-electric power and the potential of wind power as part of the energy mix has been virtually ignored. One of the reasons advanced for the under utilisation of this technology is that it is financially unattractive. In this paper the contribution which wind power could potentially make to overall power production levels in France is examined. A cost estimate model is developed which derives electricity generation costs and determines realistic levels of production for the future. The model automatically determines the associated number of wind turbines required and the geographical areas in which they should be located. (author)

  17. Wind farm electrical power production model for load flow analysis

    International Nuclear Information System (INIS)

    Segura-Heras, Isidoro; Escriva-Escriva, Guillermo; Alcazar-Ortega, Manuel

    2011-01-01

    The importance of renewable energy increases in activities relating to new forms of managing and operating electrical power: especially wind power. Wind generation is increasing its share in the electricity generation portfolios of many countries. Wind power production in Spain has doubled over the past four years and has reached 20 GW. One of the greatest problems facing wind farms is that the electrical power generated depends on the variable characteristics of the wind. To become competitive in a liberalized market, the reliability of wind energy must be guaranteed. Good local wind forecasts are therefore essential for the accurate prediction of generation levels for each moment of the day. This paper proposes an electrical power production model for wind farms based on a new method that produces correlated wind speeds for various wind farms. This method enables a reliable evaluation of the impact of new wind farms on the high-voltage distribution grid. (author)

  18. Present state and long term planning on nuclear power plants in principal countries in the world

    International Nuclear Information System (INIS)

    Nomura, Junichi

    1978-01-01

    The situation of nuclear power stations and the long term planning in each major country in the world were summarized, but the situation is changing from time to time, therefore it is difficult to make the long term prediction. The advanced countries in terms of nuclear power established the long term plans to adopt nuclear power generation largely owing to the oil crisis, but thereafter the revision was carried out again and again in respective countries. The developing countries already started the operation of nuclear power generation occupy only 2 to 3% of the total installed capacity in the world, but the countries constructing or planning nuclear power generation are many, and if the operation will be started as scheduled, their capacity will reach 30 million kW by 1985, and occupy about 10% of the total installed capacity of nuclear power generation in the world. As for the range of investigation of this report, the countries where the long term plans are unknown or the number of construction is small, Japan, Great Britain, USA and communist countries are excluded. As a rule, the light water reactors with power output of more than 200,000 kW are listed. The number of nuclear power plants in operation, under construction and in planning stage, national situation, long term plan, and others in each country are described. (Kako, I.)

  19. Integration of landslide susceptibility products in the environmental plans

    Science.gov (United States)

    Fiorucci, Federica; Reichenbach, Paola; Rossi, Mauro; Cardinali, Mauro; Guzzetti, Fausto

    2015-04-01

    Landslides are one of the most destructive natural hazard that causes damages to urban area worldwide. The knowledge of where a landslide could occur is essential for the strategic management of the territory and for a good urban planning . In this contest landslide susceptibility zoning (LSZ) is crucial to provide information on the degree to which an area can be affected by future slope movements. Despite landslide susceptibility maps have been prepared extensively during the last decades, there are few examples of application is in the environmental plans (EP). In this work we present a proposal for the integration of the landslide inventory map with the following landslide susceptibility products: (i) landslide susceptibility zonation , (ii) the associated error map and (iii) the susceptibility uncertainty map. Moreover we proposed to incorporate detailed morphological studies for the evaluation of landslide risk associated to local parceling plan. The integration of all this information is crucial for the management of landslide risk in urban expansions forecasts. Municipality, province and regional administration are often not able to support the costs of landslide risk evaluation for extensive areas but should concentrate their financial resources to specific hazardous and unsafe situations defined by the result of the integration of landslide susceptibility products. Zonation and detail morphological analysis should be performed taking into account the existing laws and regulations, and could become a starting point to discuss new regulations for the landslide risk management.

  20. Basic plan for nuclear power development and utilization in 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents specific measures to be carried out in 1987 to promote research, development and application of nuclear power. The first part deals with the strengthening of safety measures, centering on the improvement in regulation and administration for nuclear power safety; promotion of safety studies; improvement and strengthening of disaster prevention measures; improvement and strengthening of environmental activity surveys; improvement in exposure control measures for nuclear power operation workers; and establishment of the nuclear fuel cycle and safety in such activities as development of new reactors. The second part of the report addresses the promotion of nuclear power generation. Measures for this will be focused on the promotion of location of nuclear power plants and the development of advanced technology for light water reactors. The third part describes measures for establishing the nuclear fuel cycle, which cover the procurement of uranium resources; enrichment of uranium; reprocessing of spent fuel and utilization of plutonium and recovered uranium; and disposal of radioactive waste. Other parts presents measures to be carried out for the development of new power reactors; research on nuclear fusion; development of nuclear powered vessels; application of radiations; improvement in the infrastructure for nuclear power development and utilization; etc. (Nogami, K.)

  1. Consequences of reduced production of electricity in nuclear power plants

    International Nuclear Information System (INIS)

    The Swedish Power Administration has assessed the possibilities of expanding electric power sources other than nuclear power plants for the years 1980 and 1985. Reports on costs in the form of loss of capital and increased operating costs involved in the dismantling of nuclear power plants are made in Supplement 1. The economics division of the Finance Department, starting with a long-range study model of the Swedish economy, has calculated the consequences of a cutback in electric power up to 1980 for Sweden's economy and employment in that year. The consequences of reduction of electricity supplies up to 1985 are summarized in Supplement 2 in this report. It is concluded that in order to be able to manage the problem of supplying electricity by 1985, it will be necessary to increase oil power above what was assumed in the energy policy program. There will have to be new oil-based power as well. According to the Power Administration, oil-power facilities can be expanded to varying degrees, depending upon when the decision is made. The Power Administration's calculations show that 125 TWh is possible in 1985 without nuclear power only if a decision for discontinuation is made in the fall of 1976. This is based on very optimistic assumptions about the time of execution of a program for oil-steam operation, and also on the assumption that extreme measures will be initiated to force expansion of both district-heating distribution and power + heat facilities. Oil consumption for production of electricity in such an electric power system would be about 9 million m 3 , which is about 5 times more than at present and about one-third of the present total consumption of petroleum products in Sweden

  2. Performances of nuclear power plants for combined production of electricity and hot water for district heating

    International Nuclear Information System (INIS)

    Bronzen, S.

    The possibilities for using nuclear power plants for combined production of heat and power seem to be very good in the future. With the chosen 600 MWsub (e) BWR plant a heat output up to 1200 MW can be arranged. An alternative, consisting of steam extractions from the low-pressure turbine, offers a flexible solution for heat and power generation. With this alternative the combined plant can use components from normal condensing nuclear power plants. The flexible extraction design also offers a real possibility for using the combined plant in electric peak generation. However, urban siting requires long distance heat transmission and the pipe design for this transmission is a major problem when planning and optimizing the whole nuclear combined heat and power plant. (author)

  3. Selling green power in California: Product, industry, and market trends

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.H.; Pickle, S.J.

    1998-05-01

    As one of the first US stages to open its doors to retail electric competition, California offers an important opportunity to assess the effectiveness of green power marketing as a mechanism for supporting renewable energy. This report is an interim assessment of key green power product, industry, and market trends in California. The report identifies and analyzes: the potential size of the green power market in California; the companies participating in the green power market; the green power products being offered and their prices; the impact of the green market on renewable generators and the environment; and the influence of several public policies and non-governmental programs on the market for green power. Data used in this paper have been collected, in large part, from surveys and interviews with green power marketers that took place between December 1997 and April 1998. There remain legitimate concerns over the viability of green power marketing to support significant quantities of renewable energy and provide large environmental gains, and it is far too early to assess the overall strength of customer demand for renewable energy. A critical finding of this report is that, because of the high cost of acquiring and servicing residential customers and the low utility default service price, green power marketing affords new energy service providers one of the only viable entrees to California`s residential marketplace.

  4. Selling green power in California: Product, industry, and market trends

    International Nuclear Information System (INIS)

    Wiser, R.H.; Pickle, S.J.

    1998-05-01

    As one of the first US stages to open its doors to retail electric competition, California offers an important opportunity to assess the effectiveness of green power marketing as a mechanism for supporting renewable energy. This report is an interim assessment of key green power product, industry, and market trends in California. The report identifies and analyzes: the potential size of the green power market in California; the companies participating in the green power market; the green power products being offered and their prices; the impact of the green market on renewable generators and the environment; and the influence of several public policies and non-governmental programs on the market for green power. Data used in this paper have been collected, in large part, from surveys and interviews with green power marketers that took place between December 1997 and April 1998. There remain legitimate concerns over the viability of green power marketing to support significant quantities of renewable energy and provide large environmental gains, and it is far too early to assess the overall strength of customer demand for renewable energy. A critical finding of this report is that, because of the high cost of acquiring and servicing residential customers and the low utility default service price, green power marketing affords new energy service providers one of the only viable entrees to California's residential marketplace

  5. Reference costs of the electric power production; Couts de reference de la production electrique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-06-01

    This study periodically realized by the DGEMP aims to compare the competitiveness of the different channels of electric power production, for different utilization conditions. The first part ''reference costs of the 2003 electric power production'' examines the prices of the electric power produced by different channels in particular in the framework of the industrial implementing in 2015. The nuclear and thermal power plants are concerned. The second part is devoted to the decentralized production channels (wind energy, photovoltaic, cogeneration heat-electricity) is under construction and will be presented next year. (A.L.B.)

  6. Production of ozone using nanosecond short pulsed power

    OpenAIRE

    Shimomura, N.; Wakimoto, M.; Togo, H.; Namihira, Takao; Akiyama, Hidenori; ナミヒラ, タカオ; アキヤマ, ヒデノリ; 浪平, 隆男; 秋山, 秀典

    2003-01-01

    Production of ozone is one of the most typical industrial and commercial applications of electrical discharge. The demand of ozone will be increasing for wholesome and environment-friendly sterilizations. The production of ozone using the pulsed power discharge will apply electron accelerations around the head of streamer discharge. The breakdowns in reactor, however, often limit the efficient production. The pulse shape should be controlled for dimension of the reactor. On the other hand, th...

  7. Human Factors And Ergonomics In The Planning Of Production

    DEFF Research Database (Denmark)

    Jensen, Per Langå

    2002-01-01

    For year’s integration of ergonomics into the planning of new production processes has been an ideal for regulating agencies supported by ergonomic experts. But the ideal appears to be difficult to live up to. A development of tools both by agencies and by groups of researchers has been seen...... of organizational conditions for giving ergonomics a stronger position in the firm. Ergonomists have to tackle these issues, but it implies a new understanding of their roles, which goes beyond the traditional discussion of expert versus facilitator. The paper is based on an evaluation of a Swedish research......-programme of a new approach to intervention studies on musculosceletaldiseases, on a major Danish research programme on integrating ergonomics (working environment) into the planning activities of the enterprises and on discussions with the staff of the Danish mandatory occupational health and safety services...

  8. Utilizing Solar Power Technologies for On-Orbit Propellant Production

    Science.gov (United States)

    Fikes, John C.; Howell, Joe T.; Henley, Mark W.

    2006-01-01

    The cost of access to space beyond low Earth orbit may be reduced if vehicles can refuel in orbit. The cost of access to low Earth orbit may also be reduced by launching oxygen and hydrogen propellants in the form of water. To achieve this reduction in costs of access to low Earth orbit and beyond, a propellant depot is considered that electrolyzes water in orbit, then condenses and stores cryogenic oxygen and hydrogen. Power requirements for such a depot require Solar Power Satellite technologies. A propellant depot utilizing solar power technologies is discussed in this paper. The depot will be deployed in a 400 km circular equatorial orbit. It receives tanks of water launched into a lower orbit from Earth, converts the water to liquid hydrogen and oxygen, and stores up to 500 metric tons of cryogenic propellants. This requires a power system that is comparable to a large Solar Power Satellite capable of several 100 kW of energy. Power is supplied by a pair of solar arrays mounted perpendicular to the orbital plane, which rotates once per orbit to track the Sun. The majority of the power is used to run the electrolysis system. Thermal control is maintained by body-mounted radiators; these also provide some shielding against orbital debris. The propellant stored in the depot can support transportation from low Earth orbit to geostationary Earth orbit, the Moon, LaGrange points, Mars, etc. Emphasis is placed on the Water-Ice to Cryogen propellant production facility. A very high power system is required for cracking (electrolyzing) the water and condensing and refrigerating the resulting oxygen and hydrogen. For a propellant production rate of 500 metric tons (1,100,000 pounds) per year, an average electrical power supply of 100 s of kW is required. To make the most efficient use of space solar power, electrolysis is performed only during the portion of the orbit that the Depot is in sunlight, so roughly twice this power level is needed for operations in sunlight

  9. Model for optimization of plant investments in combined power and heat production systems

    Energy Technology Data Exchange (ETDEWEB)

    Jantunen, E.; Sinisalo, A.; Koskelainen, L.

    1980-01-01

    A mathematical model is developed for optimal dimensioning and timing the investments of power and heat production system in a community. The required electric power may be purchased by different production systems, such as: thermal power plants, gas turbines, diesel plants, etc. or by delivering all or part of it from a national power company. Also the required heat may be produced in many different ways in single-purpose or combined plants. The model assumes the extent of the heating system fixed, and it is not optimized. It is assumed that the same company is responsible for supplying both the power and heat for the community. It's aim is to allocate the existing capital in an optimal way, and the model may be used for facilitating the decision in such questions as: what kind of production capacity should be purchased in future; how high should the heat and power capacities be; and when should this additional capacity be available. The report also reviews the methods for forecasting the demand of power and heat and their fluctuation during the planning period. The solution of this large-scale non-linear optimization problem is searched via successive linearizations by using the Method of Approximate Programming (MAP). It was found that the solution method is very suitable for this kind of multivariable problems. The computing times with the Functional Mathematical Programmin System (FMPS) in Univac 1108 computer were quite reasonable.

  10. Is EIA part of the wind power planning problem?

    Energy Technology Data Exchange (ETDEWEB)

    Smart, Duncan Ewan; Stojanovic, Timothy A., E-mail: tas21@st-andrews.ac.uk; Warren, Charles R.

    2014-11-15

    This research evaluates the importance and effectiveness of Environmental Impact Assessment (EIA) within wind farm planning debates, drawing on insights from case studies in Scotland. Despite general public support for renewable energy on the grounds that it is needed to tackle climate change and implement sustainable development, many proposed wind farms encounter significant resistance. The importance of planning issues and (EIA) processes has arguably been overlooked within recent wind farm social acceptability discourse. Through semi-structured interviews with key stakeholders and textual analysis of EIA documents, the characteristics of EIA are assessed in terms of its perceived purpose and performance. The data show that whilst respondents perceive EIA to be important, they express concerns about bias and about the inability of EIA to address climate change and wind farm decommissioning issues adequately. Furthermore, the research identifies key issues which impede the effectiveness of EIA, and reveals differences between theoretical and practical framings of EIA. The paper questions the assumption that EIA is a universally applicable tool, and argues that its effectiveness should be analysed in the context of specific development sectors. The article concludes by reviewing whether the recently amended EIA Directive (2014/52/EU) could resolve identified problems within national EIA practice. - Highlights: • Evaluation of EIA for onshore wind farm planning in Scotland. • EIA is important for multiple aspects of onshore wind farm planning. • Multiple substantive deficiencies of relevance to wind farm planning exist in EIA. • Further research into EIA effectiveness for specific development types is required. • Directive 2014/52/EU may improve EIA effectiveness within wind farm planning.

  11. Is EIA part of the wind power planning problem?

    International Nuclear Information System (INIS)

    Smart, Duncan Ewan; Stojanovic, Timothy A.; Warren, Charles R.

    2014-01-01

    This research evaluates the importance and effectiveness of Environmental Impact Assessment (EIA) within wind farm planning debates, drawing on insights from case studies in Scotland. Despite general public support for renewable energy on the grounds that it is needed to tackle climate change and implement sustainable development, many proposed wind farms encounter significant resistance. The importance of planning issues and (EIA) processes has arguably been overlooked within recent wind farm social acceptability discourse. Through semi-structured interviews with key stakeholders and textual analysis of EIA documents, the characteristics of EIA are assessed in terms of its perceived purpose and performance. The data show that whilst respondents perceive EIA to be important, they express concerns about bias and about the inability of EIA to address climate change and wind farm decommissioning issues adequately. Furthermore, the research identifies key issues which impede the effectiveness of EIA, and reveals differences between theoretical and practical framings of EIA. The paper questions the assumption that EIA is a universally applicable tool, and argues that its effectiveness should be analysed in the context of specific development sectors. The article concludes by reviewing whether the recently amended EIA Directive (2014/52/EU) could resolve identified problems within national EIA practice. - Highlights: • Evaluation of EIA for onshore wind farm planning in Scotland. • EIA is important for multiple aspects of onshore wind farm planning. • Multiple substantive deficiencies of relevance to wind farm planning exist in EIA. • Further research into EIA effectiveness for specific development types is required. • Directive 2014/52/EU may improve EIA effectiveness within wind farm planning

  12. ''Training plan optimized design'' methodology application to IBERDROLA - Power generation

    International Nuclear Information System (INIS)

    Gil, S.; Mendizabal, J.L.

    1996-01-01

    The trend in both Europe and the United States, towards the understanding that no training plan may be considered suitable if not backed by the results of application of the S.A.T. (Systematic Approach to Training) methodology, led TECNATOM, S.A. to apply thy methodology through development of an application specific to the conditions of the Spanish working system. The requirement that design of the training be coherent with the realities of the working environment is met by systematic application of the SAT methodology as part of the work analysis and job-based task analysis processes, this serving as a basis for design of the training plans

  13. The APT program plan: Providing an assured tritium production capability

    International Nuclear Information System (INIS)

    Lisowski, P.W.; Anderson, J.L.; Bishop, W.P.; Boggs, B.; Hall, K.

    1996-01-01

    Tritium is a radioactive hydrogen isotope used in all U.S. nuclear weapons. Because the half-life of tritium is short, 12.3 yr, it must be periodically replenished. To provide a new source, the U.S. Department of Energy (DOE) is sponsoring conceptual design and engineering development and demonstration activities for a plant that will use a high-power proton linear accelerator to produce tritium and will go on-line no later than 2007. The APT project is in the process of completing the conceptual design for a tritium production plant. In addition, there are several important areas under engineering development and demonstration that will ensure an efficient, cost-effective plant design and provide an adequate margin of tritium production. Information provided from this work will be used by the DOE in its 1998 choice of production technology implementation

  14. Power system for production, construction, life support and operations in space

    International Nuclear Information System (INIS)

    Sovie, R.J.

    1988-01-01

    As one looks to man's future in space it becomes obvious that unprecedented amounts of power are required for the exploration, colonization, and exploitation of space. Activities envisioned include interplanetary travel and LEO to GEO transport using electric propulsion, Earth and lunar observatories, advance space stations, free-flying manufacturing platforms, communications platforms, and eventually evolutionary lunar and Mars bases. These latter bases would start as camps with modest power requirements (kWes) and evolve to large bases as manufacturing, food production, and life support materials are developed from lunar raw materials. These latter activities require very robust power supplies (MWes). The advanced power system technologies being pursued by NASA to fulfill these future needs are described. Technologies discussed will include nuclear, photovoltaic, and solar dynamic space power systems, including energy storage, power conditioning, power transmission, and thermal management. The state-of-the-art and gains to be made by technology advancements will be discussed. Mission requirements for a variety of applications (LEO, GEO, lunar, and Martian) will be treated, and data for power systems ranging from a few kilowatts to megawatt power systems will be represented. In addition the space power technologies being initiated under NASA's new Civilian Space Technology Initiative (CSTI) and Space Leadership Planning Group Activities will be discussed

  15. Multi-assortment rhythmic production planning and control

    Science.gov (United States)

    Skolud, B.; Krenczyk, D.; Zemczak, M.

    2015-11-01

    A method for production planning in a repetitive manufacturing system which allows for estimating the possibility of processing work orders in due time is presented. The difference between two approaches are presented; the first one one-piece flow elaborated in Toyota and the second one elaborated by authors that consists in defining sufficient conditions to filter all solutions and providing a set of admissible solutions for both the client and the producer. In the paper attention is focused on the buffer allocation. Illustrative examples are presented.

  16. Expanding Nuclear Power Programmes - Romanian experience: Master - Nuclear Materials and Technologies Educational Plan

    International Nuclear Information System (INIS)

    Valeca, S.; Valeca, M.

    2012-01-01

    The main objectives of the Master Nuclear Materials and Technologies Educational Plan are: 1. To deliver higher education and training in the following specific domains, such as: Powders Technology and Ceramic Materials, Techniques of Structural Analysis, Composite Materials, Semiconductor Materials and Components, Metals and Metallic Alloys, Optoelectronic Materials and Devices, Nuclear Materials, The Engineering of Special Nuclear Materials, 2. To train managers of the Nuclear Waste Products and Nuclear Safety, 3. To qualify in ICT Systems for Nuclear Process Guidance, 4. To qualify in Environmental Protection System at the Level of Nuclear Power Stations, 5. To train managers for Quality Assurance of Nuclear Energetic Processes, 6. To deliver higher education and training regarding the International Treatises, Conventions and Settlements in force in the field of nuclear related activities. (author)

  17. Road maps on research and development plans for water chemistry of nuclear power systems

    International Nuclear Information System (INIS)

    Uchida, Shunsuke; Katsumura, Yosuke; Fuse, Motomasa; Takamori, Kenro; Tsuchiuchi, Yoshihiro; Maeda, Noriyoshi

    2008-01-01

    Water chemistry of nuclear power plants has played an important role in reduction of personnel doses, structural materials and fuel integrity assurance, and reduction of radioactive wastes production. Further contributions are requested for advanced utilization of the LWR, advanced fuels and aging management of plants. Since water chemistry has an effect on all structure and materials immersed and at the same time affected by them, the optimum control not sticking to specific issues and covering the whole plant is required for these requests. Taking account of roles and activities of the industry, governmental institutes and academia, road maps on research and development plans for water chemistry were compiled into identified eleven items with targets and counter measures taken, such as common basic technologies, dose reduction, SCC mitigation, fuel cans corrosion/hydrogen absorption mitigation, condition based maintenance and flow accelerated corrosion mitigation. (T. Tanaka)

  18. Developing maximal neuromuscular power: Part 1--biological basis of maximal power production.

    Science.gov (United States)

    Cormie, Prue; McGuigan, Michael R; Newton, Robert U

    2011-01-01

    This series of reviews focuses on the most important neuromuscular function in many sport performances, the ability to generate maximal muscular power. Part 1 focuses on the factors that affect maximal power production, while part 2, which will follow in a forthcoming edition of Sports Medicine, explores the practical application of these findings by reviewing the scientific literature relevant to the development of training programmes that most effectively enhance maximal power production. The ability of the neuromuscular system to generate maximal power is affected by a range of interrelated factors. Maximal muscular power is defined and limited by the force-velocity relationship and affected by the length-tension relationship. The ability to generate maximal power is influenced by the type of muscle action involved and, in particular, the time available to develop force, storage and utilization of elastic energy, interactions of contractile and elastic elements, potentiation of contractile and elastic filaments as well as stretch reflexes. Furthermore, maximal power production is influenced by morphological factors including fibre type contribution to whole muscle area, muscle architectural features and tendon properties as well as neural factors including motor unit recruitment, firing frequency, synchronization and inter-muscular coordination. In addition, acute changes in the muscle environment (i.e. alterations resulting from fatigue, changes in hormone milieu and muscle temperature) impact the ability to generate maximal power. Resistance training has been shown to impact each of these neuromuscular factors in quite specific ways. Therefore, an understanding of the biological basis of maximal power production is essential for developing training programmes that effectively enhance maximal power production in the human.

  19. A production model and maintenance planning model for the process industry

    NARCIS (Netherlands)

    Ashayeri, J.; Teelen, A.; Selen, W.J.

    1995-01-01

    In this paper a model is developed to simultaneously plan preventive maintenance and production in a process industry environment, where maintenance planning is extremely important. The model schedules production jobs and preventive maintenance jobs, while minimizing costs associated with

  20. A Graphical Interactive Simulation Environment for Production Planning in Bacon Factories

    DEFF Research Database (Denmark)

    Nielsen, Kirsten Mølgaard; Nielsen, Jens Frederik Dalsgaard

    1994-01-01

    The paper describes a graphical interactive simulation tool for production planning in bacon factories........The paper describes a graphical interactive simulation tool for production planning in bacon factories.....

  1. A nuclear power plant certification test plan and checklist

    International Nuclear Information System (INIS)

    Halverson, S.M.

    1989-01-01

    Regulations within the nuclear industry are requiring that all reference plant simulators be certified prior to or during 1991. A certification test plan is essential to ensure that this goal is met. A description of each step in the certification process is provided in this paper, along with a checklist to help ensure completion of each item

  2. Empirical study on voting power in participatory forest planning.

    Science.gov (United States)

    Vainikainen, N; Kangas, A; Kangas, J

    2008-07-01

    Multicriteria decision support systems are applied in natural resource management in order to clarify the planning process for the stakeholders, to make all available information usable and all objectives manageable. Especially when the public is involved in planning, the decision support system should be easy to comprehend, transparent and fair. Social choice theory has recently been applied to group decision-making in natural resources management to accomplish these objectives. Although voting forms the basis of democracy, and is usually taken as a fair method, the influence of voters over the outcome may vary. It is also possible to vote strategically to improve the results from each stakeholder's point of view. This study examines the use of social choice theory in revealing stakeholders' preferences in participatory forest planning, and the influence of different voters on the outcome. The positional voting rules examined were approval voting and Borda count, but both rules were slightly modified for the purposes of this study. The third rule examined, cumulative rule, resembles utilitarian voting rules. The voting rules were tested in a real participatory forest planning situation in eastern Lapland, Finland. All voting rules resulted in a different joint order of importance of the criteria. Yet, the preference orders produced had also a lot in common and the criteria could be divided into three quite distinct groups according to their importance. The influence of individual voters varied between the voting rules, and in each case different voter was the most influential.

  3. 2015 Plan. Project 5: transmission systems of electric power

    International Nuclear Information System (INIS)

    1992-12-01

    The planning aspects of transmission system expansion in Brazil are described, mentioning the evolution at long date of the transmission system, emphasizing the qualitative and strategic aspects. The engineering aspects and the technological development are also presented. (C.G.C.)

  4. Rubbia floats a plan for accelerator power plants

    CERN Multimedia

    Aldhous, P

    1993-01-01

    Carlo Rubbia is planning a project to develop a nuclear reactor fueled by thorium. A particle accelerator would increase the neutron supply to the thorium cycle reactor. Rubbia states that the idea is theoretical but believes that it would be economically practical.

  5. Acceptance criteria for the evaluation of nuclear power reactor security plans

    International Nuclear Information System (INIS)

    1982-08-01

    This guidance document contains acceptance criteria to be used in the NRC license review process. It contains specific criteria for use in evaluating the acceptability of nuclear power reactor security programs as detailed in security plans

  6. Daya Bay Nuclear Power Station five-year business plan and operating results

    International Nuclear Information System (INIS)

    Zhang Shanming

    2000-01-01

    Guangdong Nuclear Power Joint Venture Company, Ltd. first 5-Year Business Plan (hereinafter referred to as 5-Year Business Plan) serves as guidance of both the operations and management of the company. Continuous performance improvement of the nuclear power station has been achieved through the fulfillment of goals and improvement plan defined by the 5-Year Business Plan, and through standard and systematic management. Daya Bay Nuclear Power Station (GNPS) has made great contributions to sustainable economic developments of both Guangdong and Hong Kong since its commercial operation in 1994. As of the end of 1999, the cumulative off-take electricity generated by GNPS had reached 69.9 billion kWh. Of the WANO indicators universally applied by nuclear power industry throughout the world, 6 indicators of Daya Bay performance entered the world top quartile while 9 the medium level

  7. Strategic Sustainability Performance Plan. Discovering Sustainable Solutions to Power and Secure America’s Future

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2010-09-01

    Sustainability is fundamental to the Department of Energy’s research mission and operations as reflected in the Department’s Strategic Plan. Our overarching mission is to discover the solutions to power and secure America’s future.

  8. On the question of a site plan approval procedure for large-scale power stations

    International Nuclear Information System (INIS)

    Roemermann, K.

    1982-01-01

    The author discusses the question whether a plan approval procedure for large-sclae power plants might contribute to shortening the period of time currently used for the licensing of such plants. On the basis of current practice which includes a planning and building permission by virtue of section 35 of the building law (BBauG) together with an approval of plans within the framework of regional planning, the author explains and discusses various models of site plan approval procedures, (a.o. section 38 of the Federal building law). (HP) [de

  9. Implementation of Logic Flow in Planning and Production Control

    Directory of Open Access Journals (Sweden)

    Ulewicz Robert

    2016-03-01

    Full Text Available The article presents the results of analysis, the use of continuous flow of logic at the stage of production planning and control of the company producing furniture. The concept of continuous flow tends to regulate the flow of materials in a manner that provides the shortest flow path without unnecessary activities (Muda is a Japanese word meaning waste, a constant takt and defined throughput at constant resource requirements for the so-called transfer of material through the whole process. In the study Glenday’d sieve method was used to identify the correct area, which requires the value stream mapping, and areas called excessive complexity, which do not provide added value. The use of Glenday’s sieve method made it possible to identify areas in which it must be improve production capacity.

  10. A Stochastic Operational Planning Model for Smart Power Systems

    Directory of Open Access Journals (Sweden)

    Sh. Jadid

    2014-12-01

    Full Text Available Smart Grids are result of utilizing novel technologies such as distributed energy resources, and communication technologies in power system to compensate some of its defects. Various power resources provide some benefits for operation domain however, power system operator should use a powerful methodology to manage them. Renewable resources and load add uncertainty to the problem. So, independent system operator should use a stochastic method to manage them. A Stochastic unit commitment is presented in this paper to schedule various power resources such as distributed generation units, conventional thermal generation units, wind and PV farms, and demand response resources. Demand response resources, interruptible loads, distributed generation units, and conventional thermal generation units are used to provide required reserve for compensating stochastic nature of various resources and loads. In the presented model, resources connected to distribution network can participate in wholesale market through aggregators. Moreover, a novel three-program model which can be used by aggregators is presented in this article. Loads and distributed generation can contract with aggregators by these programs. A three-bus test system and the IEEE RTS are used to illustrate usefulness of the presented model. The results show that ISO can manage the system effectively by using this model

  11. Study of Heating and Fusion Power Production in ITER Discharges

    International Nuclear Information System (INIS)

    Rafiq, T.; Kritz, A. H.; Bateman, G.; Kessel, C.; McCune, D. C.; Budny, R. V.; Pankin, A. Y.

    2011-01-01

    ITER simulations, in which the temperatures, toroidal angular frequency and currents are evolved, are carried out using the PTRANSP code starting with initial profiles and boundary conditions obtained from TSC code studies. The dependence of heat deposition and current drive on ICRF frequency, number of poloidal modes, beam orientation, number of Monte Carlo particles and ECRH launch angles is studied in order to examine various possibilities and contingencies for ITER steady state and hybrid discharges. For the hybrid discharges, the fusion power production and fusion Q, computed using the Multi-Mode MMM v7.1 anomalous transport model, are compared with those predicted using the GLF23 model. The simulations of the hybrid scenario indicate that the fusion power production at 1000 sec will be approximately 500 MW corresponding to a fusion Q = 10.0. The discharge scenarios simulated aid in understanding the conditions for optimizing fusion power production and in examining measures of plasma performance.

  12. Wind power. Production in 2012; Vindkraft. Produksjon i 2012

    Energy Technology Data Exchange (ETDEWEB)

    Weir, David Edward; Nybakke, Karen

    2013-02-01

    In 2012 it was installed more wind power in Norway than in any year before. There was also production record with a total power generation from wind energy at ca. 1.57 TWh, equivalent to 1.1% of Norway's electricity production. 2012 was a relatively good 'wind year', with a production index of 107% for Norwegian wind farms as a whole. The length of time for wind was also relatively high compared to previous years with a national average of 2734 full load hours, corresponding to a capacity factor of 31%. Turbine availability also reached a record value of 95.6% in 2012 indicating more efficient operation of wind power plants in Norway.(eb)

  13. Integrated approach to economical, reliable, safe nuclear power production

    International Nuclear Information System (INIS)

    1982-06-01

    An Integrated Approach to Economical, Reliable, Safe Nuclear Power Production is the latest evolution of a concept which originated with the Defense-in-Depth philosophy of the nuclear industry. As Defense-in-Depth provided a framework for viewing physical barriers and equipment redundancy, the Integrated Approach gives a framework for viewing nuclear power production in terms of functions and institutions. In the Integrated Approach, four plant Goals are defined (Normal Operation, Core and Plant Protection, Containment Integrity and Emergency Preparedness) with the attendant Functional and Institutional Classifications that support them. The Integrated Approach provides a systematic perspective that combines the economic objective of reliable power production with the safety objective of consistent, controlled plant operation

  14. Personalisation of power, neoliberalism and the production of corruption

    OpenAIRE

    Ahmad Khair, Amal Hayati; Haniffa, Roszaini; Hudaib, Mohammad; Abd. Karim, Mohamad Nazri

    2015-01-01

    This paper utilises a political lens in considering the cause for the production of corruption and the role of political leadership. Specifically, the notion of personalisation of power as advocated by Slater (2003) is adopted to portray how the adoption of neoliberalism ideology by an aspiring autocratic leader results in the weakening of the infrastructural power through three strategies: packing, rigging and circumventing. We use Perwaja Steel as a case study to demonstrate the modus opera...

  15. Analytic network process (ANP approach for product mix planning in railway industry

    Directory of Open Access Journals (Sweden)

    Hadi Pazoki Toroudi

    2016-08-01

    Full Text Available Given the competitive environment in the global market in recent years, organizations need to plan for increased profitability and optimize their performance. Planning for an appropriate product mix plays essential role for the success of most production units. This paper applies analytical network process (ANP approach for product mix planning for a part supplier in Iran. The proposed method uses four criteria including cost of production, sales figures, supply of raw materials and quality of products. In addition, the study proposes different set of products as alternatives for production planning. The preliminary results have indicated that that the proposed study of this paper could increase productivity, significantly.

  16. Model business plan for a sterile insect production facility

    International Nuclear Information System (INIS)

    2008-01-01

    For over 50 years the sterile insect technique (SIT) is a pest control strategy which has been used for eradication, and more recently for suppression, containment and prevention, of unwanted insect pest populations. Examples of successful applications of SIT, almost always applied in conjunction with other control methods in an area-wide integrated approach, are available from around the world. The development and application of SIT has relied overwhelmingly on public or donor initiative and funding throughout its history, although the private sector has always been involved as participants, cooperators or partners in funding. The demand for SIT, and therefore the market for sterile insects, has increased in recent years. This increase coincides with the introduction of new pests through the expansion of global trade and, at the same time, widespread pressure to find alternatives to pesticides. Recent improvements in the technology supporting SIT facilitate its application and suggest lower costs can be achieved. The conditions are therefore met for a greater commercialization of the technique to bring it in line with other pest control approaches that are fully integrated into a market approach. Several challenges arise, however, in pursuing sterile insect production as a commercial venture, ranging from intellectual property protection to pricing of the product. Routine insurance requirements, for instance, are complicated by the biological aspects of the business. This report is aimed at facilitating private sector involvement in the production of sterile insects for use in pest control. It provides guidelines and tools to support the development of specific business plans for a new SIT venture. By providing an international perspective on such issues as initial capital costs and recurring operational expenditures for a sterile insect facility, it may be used to evaluate the feasibility of proceeding with the construction or expansion of a sterile insect

  17. Proposing an Aggregate Production Planning Model by Goal Programming Approach, a Case Study

    Directory of Open Access Journals (Sweden)

    Mansoureh Farzam Rad

    2014-06-01

    Full Text Available Production planning is one of the most important functions in the process of production management. Production planning in the intermediate range of time is termed as aggregate production planning (APP. Aggregate production planning is an important upper level planning activity in a production management system. The present study tries to suggest an aggregate production planning model for products of Hafez tile factory during one year. Due to this fact that the director of the company seeks 3 main objectives to determine the optimal production rate, the linear goal planning method was employed. After solving the problem, in order to examine the efficiency and the distinctiveness of this method in compare to linear programming, the problem was modeled just by considering one objective then was solved by linear programming approach. The findings revealed the goal programming with multi objectives resulted more appropriate solution rather than linear programming with just one objective.

  18. A study of the optimum draft of multiple resonance power buoys for maximizing electric power production

    Directory of Open Access Journals (Sweden)

    Hyuck-Min Kweon

    2014-12-01

    Full Text Available To maximize electric power production using wave energy extractions from resonance power buoys, the maximum motion displacement spectra of the buoys can primarily be obtained under a given wave condition. In this study, wave spectra observed in shoaling water were formulated. Target resonance frequencies were established from the arithmetic means of modal frequency bands and the peak frequencies. The motion characteristics of the circular cylindrical power buoys with corresponding drafts were then calculated using numerical models without considering PTO damping force. Results showed that the heave motions of the power buoys in shoaling waters with insufficient drafts produced greater amplification effects than those in deep seas with sufficient drafts.

  19. Living with nuclear power and planning for the future

    International Nuclear Information System (INIS)

    Lauer, R.

    2000-01-01

    Obrigheim, Germany has become well-known throughout the world for its nuclear power plant. The people living in Obrigheim and the surrounding villages support the existence of the nuclear power plant in its present state. The owners of the plant have informed the public quite openly and underlined the great importance of safety during both construction and operation of the plant. The cooperation with the local authorities and the public has been is still is very good. The employees of the plant are fully integrated into the life of the community. Additionally, Obrigheim is the only nuclear power plant in Germany that will offer a location of an intermediate spent fuel storage facility, avoiding thus the problem of radioactive materials transport, fulfilling thus the crucial requirements of a long-term operating time, i.e. there would be no reason for shutdown

  20. Power Production and Economical Feasibility of Tideng Tidal Stream Power Converter

    DEFF Research Database (Denmark)

    Parmeggiani, Stefano; Frigaard, Peter; Kofoed, Jens Peter

    This report is a product of the contract between Aalborg University and TIDENG (by Bent Hilleke) on the evaluation and development of the TIDENG Tidal Energy Conversion System (TECS). The work has focused on the evaluation of the yearly power production of the device and its economical feasibility...

  1. Engineering schedule control of nuclear power project planning and management

    International Nuclear Information System (INIS)

    Meng Hao

    2014-01-01

    Nuclear power design is the important part of project management of nuclear power project, it is the way to control the project organization, design schedule, design progress, design quality and cost control. The good schedule system and control is the key to the success for the project. It is also analyzed the problem during the project, by using some theory and analyze the project structure, design schedule management, IED and document management and interface management propose some new idea for better improve the design management to finally better improve the management quality and efficiency. (author)

  2. Power plant construction lead times: The value of contingency planning

    International Nuclear Information System (INIS)

    Rubin, L.J.

    1985-01-01

    In this paper an analysis of two different approaches to the construction of a major power plant (nuclear) is presented. The analysis compares an accelerated, ''go-for-broke'' strategy-which has some risk of being delayed-with a more deliberate contingency construction schedule in terms of revenue requirements and costs of electricity. It is demonstrated that under a wide variety of circumstances there are important advantages to the contingency strategy, but that the magnitude of those advantages is sensitive to the character of the power system being examined and to the flexibility of the contingency approach

  3. National nuclear power planning of China and advanced reactor

    International Nuclear Information System (INIS)

    Qian Jihui

    1990-01-01

    The necessity of investigation on the trends of advanced reactor technology all over the world is elabrated while China is going to set up its long-term national nuclear power programme. In author's opinion, thermal reactor power plants will have a quite long period development in the next century and a new trend of second generation NPPs might emerge in the beginning of next century. These new generation advanced reactors are characterized with new design concepts based on the inherent or passive safety features. Among them, most promising ones are those of AP-600 and MHTGR. Chinese experts are paying special attention to and closely following these two directions

  4. Radioisotope Production Plan and Strategy of Kijang Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kye Hong; Lee, Jun Sig [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    This reactor will be located at Kijang, Busan, Korea and be dedicated to produce mainly medical radioisotopes. Tc-99m is very important isotope for diagnosis and more than 80% of radiation diagnostic procedures in nuclear medicine depend on this isotope. There were, however, several times of insecure production of Mo-99 due to the shutdown of major production reactors worldwide. OECD/NEA is leading member countries to resolve the shortage of this isotope and trying to secure the international market of Mo-99. The radioisotope plan and strategy of Kijang Research Reactor (KJRR) should be carefully established to fit not only the domestic but also international demand on Mo-99. The implementation strategy of 6 principles of HLG-MR should be established that is appropriate to national environments. Ministry of Science, ICT and Future Planning and Ministry of Health and welfare should cooperate well to organize the national radioisotope supply structure, to set up the reasonable and competitive pricing of radioisotopes, and to cope with the international supply strategy.

  5. The impact of a large penetration of intermittent sources on the power system operation and planning

    Science.gov (United States)

    Ausin, Juan Carlos

    This research investigated the impact on the power system of a large penetration of intermittent renewable sources, mainly wind and photovoltaic generation. Currently, electrical utilities deal with wind and PV plants as if they were sources of negative demand, that is to say, they have no control over the power output produced. In this way, the grid absorbs all the power fluctuation as if it were coming from a common load. With the level of wind penetration growing so quickly, there is growing concern amongst the utilities and the grid operators, as they will have to deal with a much higher level of fluctuation. In the same way, the potential cost reduction of PV technologies suggests that a similar development may be expected for solar production in the mid term. The first part of the research was focused on the issues that affect utility planning and reinforcement decision making. Although DG is located mainly on the distribution network, a large penetration may alter the flows, not only on the distribution lines, but also on the transmission system and through the transmission - distribution interfaces. The optimal capacity and production costs for the UK transmission network have been calculated for several combinations of load profiles and typical wind/PV output scenarios. A full economic analysis is developed, showing the benefits and disadvantages that a large penetration of these distributed generators may have on transmission system operator reinforcement strategies. Closely related to planning factors are institutional, revelatory, and economic considerations, such as transmission pricing, which may hamper the integration of renewable energy technologies into the electric utility industry. The second part of the research related to the impact of intermittent renewable energy technologies on the second by second, minute by minute, and half-hour by half-hour operations of power systems. If a large integration of these new generators partially replaces the

  6. Reliability program plan for the Kilowatt Isotope Power System (KIPS) technology verification phase

    International Nuclear Information System (INIS)

    1978-01-01

    Ths document is an integral part of the Kilowatt Isotope Power System (KIPS) Program Plan. This document defines the KIPS Reliability Program Plan for the Technology Verification Phase. This document delineates the reliability assurance tasks that are to be accomplished by Sundstrand and its suppliers during the design, fabrication and testing of the KIPS

  7. New aspects in the radiological emergency plan outside the Nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Alva L, S.

    1991-01-01

    The Mexican government through the National Commission of Nuclear Safety and Safeguards has imposed to the Federal Commission of Electricity to fulfill the requirement of having a functional Emergency Plan and under the limits that the regulator organisms in the world have proposed. The PERE (Plan of External Radiological Emergency) it has been created for the Nuclear Power station of Laguna Verde, Mexico

  8. Some special problems during the planning and construction of the Paks nuclear power station

    International Nuclear Information System (INIS)

    Szilagyi, Gyula; Szalai, Geza; Ferenczy, Gabor; Sarkoezy, Endre; Daniel, Gabor

    1984-01-01

    The construction of the power plant building using cradle case technology is outlined. The planning and construction of the auxiliary building for waste storage, for water-treatment equipment and others are described. The planning and specifications of a part of the electrical and control systems are presented briefly. Finally, the use of computer-aided design techniques is mentioned. (R.P.)

  9. Some special problems during the planning and construction of the Paks nuclear power station

    Energy Technology Data Exchange (ETDEWEB)

    Szilagyi, G.; Szalai, G.; Ferenczy, G.; Sarkoezy, E.; Daniel, G. (Eroemue es Halozattervezoe Vallalat, Eroeterv, Budapest (Hungary))

    1984-01-01

    The construction of the power plant building using cradle case technology is outlined. The planning and construction of the auxiliary building for waste storage, for water-treatment equipment and others are described. The planning and specifications of a part of the electrical and control systems are presented briefly. Finally, the use of computer-aided design techniques is mentioned.

  10. Electric plant cost and power production expenses 1990

    International Nuclear Information System (INIS)

    1992-06-01

    Electric Plant Cost and Power Production Expenses is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA); US Department of Energy. This publication presents electric utility statistics on power production expenses and construction costs of electric generating plants. Data presented here are intended to provide information to the electric utility industry, educational institutions, Federal, State, and local governments, and the general public. These data are collected and published to fulfill data collection and dissemination responsibilities of the Energy Information Administration (EIA), as specified in the Federal Energy Administration Act (Public Law 93-275), as amended

  11. Electric plant cost and power production expenses 1991

    International Nuclear Information System (INIS)

    1993-01-01

    Electric Plant Cost and Power Production Expenses is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels (CNEAF); Energy Information Administration (EIA); US Department of Energy. This publication presents electric utility statistics on power production expenses and construction costs of electric generating plants. Data presented here are intended to provide information to the electric utility industry, educational institutions, Federal, State, and local governments, and the general public. These data are collected and published to fulfill data collection and dissemination responsibilities of the Energy Information Administration (EIA), as specified in the Federal Energy Administration Act (Public Law 93-275), as amended

  12. Resource-based optimization of electric power production (in Iran)

    International Nuclear Information System (INIS)

    Sadeghzadeh, Mohammad

    1999-01-01

    This paper is about electric power production optimization and chiefly discusses on the types of resources available in Iran. The modeling has been based on the marginal cost of different energy resources and types of technologies used. the computed costs are the basic standards for optimization of the production system of energy. the costs associated with environmental pollution and also pollution control are considered. the present paper also studied gas fossil fuel, hydro, nuclear, renewable and co-generation of heat and power. The results are discussed and reported at the last of the paper

  13. Planning for rate base treatment of large power plants

    International Nuclear Information System (INIS)

    Faruki, C.J.

    1986-01-01

    This paper addresses two related areas of planning for inclusion in rate base of large generating stations. First, the paper discusses the range of options available as to how the plant is to go into rate base, e.g., phase-in plans. In this connection the process of generating the entire range of options that may be available is described and examined. Second, the paper examines innovative ways of using procedures (e.g., accounting proceedings, settlement procedures, cost caps, and other ideas short of a full-blown rate case) and the resources available in the ratemaking arena, to obtain, in the least painful way possible, the necessary ratemaking orders. The thesis is that there must be better alternatives to the many proceedings that have either begun as, or seem to be leading to, endless retrospective examinations of multiple questions (from load forecasting to construction management to continuation-of-construction decisions) under the label of prudence inquiries

  14. Multiperiod planning tool for multisite pig production systems.

    Science.gov (United States)

    Nadal-Roig, E; Plà, L M

    2014-09-01

    This paper presents a multiperiod planning tool for multisite pig production systems based on Linear Programming (LP). The aim of the model is to help pig managers of multisite systems in making short-term decisions (mainly related to pig transfers between farms and batch management in fattening units) and mid-term or long-term decisions (according to company targets and expansion strategy). The model skeleton follows the structure of a three-site system that can be adapted to any multisite system present in the modern pig industry. There are three basic phases, namely, piglet production, rearing pigs, and fattening. Each phase involves a different set of farms; therefore, transportation between farms and delivering of pigs to the abattoir are under consideration. The model maximizes the total gross margin calculated from the income of sales to the abattoir and the production costs over the time horizon considered. Production cost depends on each type of farm involved in the process. Parameters like number of farms per phase and distance, farm capacity, reproduction management policies, feeding and veterinary expenses, and transportation costs are taken into account. The model also provides a schedule of transfers between farms in terms of animals to be transported and number of trucks involved. The use of the model is illustrated with a case study based on a real instance of a company located in Catalonia (Spain).

  15. Planning for decommissioning of Ignalina Nuclear Power Plant Unit-1

    International Nuclear Information System (INIS)

    Poskas, P.; Poskas, R.; Zujus, R.

    2002-01-01

    In accordance to Ignalina NPP Unit 1 Closure Law, the Government of Lithuania approved the Ignalina NPP Unit 1 Decommissioning Program until 2005. For enforcement of this program, the plan of measures for implementation of the program was prepared and approved by the Minister of Economy. The plan consists of two parts, namely technical- environmental and social-economic. Technical-environmental measures are mostly oriented to the safe management of spent nuclear fuel and operational radioactive waste stored at the plant and preparation of licensing documents for Unit 1 decommissioning. Social-economic measures are oriented to mitigate the negative social and economic impact on Lithuania, inhabitants of the region, and, particularly, on the staff of Ignalina NPP by means of creating favorable conditions for a balanced social and economic development of the region. In this paper analysis of planned radioactive waste management technologies, licensing documents for decommissioning, other technical-environmental and also social-economic measures is presented. Specific conditions in Lithuania important for defining the decommissioning strategy are highlighted. (author)

  16. Proceedings of National Avian-Wind Power Planning Meeting IV

    Energy Technology Data Exchange (ETDEWEB)

    NWCC Avian Subcommittee

    2001-05-01

    OAK-B135 The purpose of the fourth meeting was to (1) share research and update research conducted on avian wind interactions (2) identify questions and issues related to the research results, (3) develop conclusions about some avian/wind power issues, and (4) identify questions and issues for future avian research.

  17. A roadmap for cost-of-goods planning to guide economic production of cell therapy products.

    Science.gov (United States)

    Lipsitz, Yonatan Y; Milligan, William D; Fitzpatrick, Ian; Stalmeijer, Evelien; Farid, Suzanne S; Tan, Kah Yong; Smith, David; Perry, Robert; Carmen, Jessica; Chen, Allen; Mooney, Charles; Fink, John

    2017-12-01

    Cell therapy products are frequently developed and produced without incorporating cost considerations into process development, contributing to prohibitively costly products. Herein we contextualize individual process development decisions within a broad framework for cost-efficient therapeutic manufacturing. This roadmap guides the analysis of cost of goods (COG) arising from tissue procurement, material acquisition, facility operation, production, and storage. We present the specific COG considerations related to each of these elements as identified through a 2013 International Society for Cellular Therapy COG survey, highlighting the differences between autologous and allogeneic products. Planning and accounting for COG at each step in the production process could reduce costs, allowing for more affordable market pricing to improve the long-term viability of the cell therapy product and facilitate broader patient access to novel and transformative cell therapies. Copyright © 2017 International Society for Cellular Therapy. Published by Elsevier Inc. All rights reserved.

  18. Production in Italian industry: Electric power demand indicators

    International Nuclear Information System (INIS)

    Ajello, V.

    1993-01-01

    The effects of the recession in Italy were first evidenced during the period spanning 1990-1992 with a sharp drop in the international competitiveness of Italian products. This phase was then followed by a significant drop in internal demand, the devaluation of the Italian Lira and subsequent market uncertainty. This paper presents graphs of national and regional electric power production and consumption figures which reflect the downturn in the viability of the Italian economy, especially in the industrial sector

  19. Spatial Trade-Offs between Wind Power Production and Bird Collision Avoidance in Agricultural Landscapes

    Directory of Open Access Journals (Sweden)

    Marcus Eichhorn

    2010-06-01

    Full Text Available The expansion of renewable energy production is seen as an appropriate way to mitigate climate change. Renewable energies are not free of negative external effects on humans and the natural environment. We analyzed the conflict between wind power production and bird protection through the example of one of the most sensitive species, the red kite (Milvus milvus in West Saxony, Germany. We investigated a large number of potential land use scenarios, defined by whether or not each potential site contained a wind turbine (WT. Based on meteorological and ornithological data, we evaluated the land use scenarios for their annual energy supply and impact on the red kite. We identified the efficient land use scenarios that maximized energy supply for a given ecological impact. Within the scope of our analysis, the current allocation of WTs in the study region was considered inefficient. The set of efficient scenarios allowed us to draw conclusions on the trade-offs involved. We developed an indicator that measures the severity of the conflict between wind power production and bird protection. Increasing the minimum distance of WTs to settlements beyond the legal requirements in order to minimize the impact on humans further intensifies the conflict. Our results can support planning authorities in their development of long-term regional plans by identifying areas that are most suitable for wind power production from an integrated point of view.

  20. 76 FR 45741 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Diesel-Powered Motor...

    Science.gov (United States)

    2011-08-01

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Diesel-Powered Motor Vehicle Idling Act AGENCY... the Commonwealth's Diesel-Powered Motor Vehicle Idling Act (Act 124 of 2008, or simply Act 124) into... allowable time that heavy-duty, commercial highway diesel vehicles of over 10,000 pounds gross vehicle...

  1. Renewable Energy in Danish Municipalities - an Evaluation of The Planning Framework for Wind Power

    DEFF Research Database (Denmark)

    Sperling, Karl; Hvelplund, Frede; Mathiesen, Brian Vad

    2009-01-01

    Wind power is a maturing technology that in a number of countries is likely to contribute a major share to fully renewable energy systems. Denmark has a comparably long history of wind power development and is planning to continue expanding the existing capacity. If a large-scale penetration of w...

  2. Generation expansion planning of the electrical power system in West Java

    International Nuclear Information System (INIS)

    Nengah Sudja.

    1975-01-01

    A thorough study on the generation expansion planning of the electrical power system, covering mathematical and computerized calculations, and financial analysis on the daily load, the load duration, and the assumption of future load, supporting the idea for building nuclear power plants in Indonesia, is presented. (RUW)

  3. Stochastic Programming for Fuel Supply Planning of Combined Heat and Power Plants

    DEFF Research Database (Denmark)

    Guericke, Daniela; Blanco, Ignacio; Morales González, Juan Miguel

    The consumption of biomass to produce power and heat has increased due to the carbon neutral policies. Combined heat and power (CHP) plants often combine biomass with other fuels, e.g., natural gas. The negotiation process for supply contracts involves many uncertainties due to the long planning...... horizon. The demand for biomass is uncertain, and heat demand and electricity prices vary during the planning period. We propose a method using stochastic optimization to support the biomass and natural gas supply planning for CHP plants including short-term decisions for optimal market participation....

  4. The competitiveness of biofuels in heat and power production

    International Nuclear Information System (INIS)

    Kosunen, P.; Leino, P.

    1995-01-01

    The paper showed that natural gas is the most competitive fuel in all the energy production alternatives under review, ie both in separate heat production and electricity generation and in combined heat and power production. Even though the heavy fuel oil taxes have grown more rapidly than taxes on domestic fuels, oil continues to be cheaper than solid fuels in heating and steam plants. According to the feasibility calculations made, combined heat and power production is the least-cost production form of electricity, and the larger the plant unit, the lower the cost. Looking to the future, in respect of merely the development in fuel taxes the competitiveness of domestic fuels will improve markedly if the taxation structure remains unchanged. It seems that at smaller points of consumption, such as heating and steam plants and small-scale power plants, fuel chips would be the most competitive fuel. In larger units, such as heat and power production plants and condensing power plants, fuel peat, primarily milled peat, would be the most competitive. The competitiveness of fuel chips at larger plants will probably be limited by the supply of sufficient volumes from such an area where the delivery costs would not raise the price of fuel chips too high. Coal would remain competitive only if the real import price of coal rose clearly more slowly than the real prices of domestic fuels. It seems that heavy fuel oil will be used only as a start-up, support and back-up fuel. Evaluating the future competitiveness of natural gas is difficult, since the impact of new pipeline investments on the price of natural gas is not known

  5. Planning of micro-combined heat and power systems in the Portuguese scenario

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Eliseu; Moreira, Nuno Afonso [CITAB, University of Tras-os-Montes e Alto Douro, P-5000-911 Vila Real (Portugal); Ferreira, Sergio [R and D Department, Tecaprod S.A. (Portugal)

    2009-03-15

    High efficiency cogeneration is seen by the European Commission as part of the solution to increase energy efficiency and improve security of supply in the internal energy markets. Portuguese residential sector has an estimated technical market potential of around 500 MW{sub e} for cogeneration of <150 kW{sub e} in size. Additionally, in Portugal there is a specific law for power production in low voltage, where at least 50% of the produced electric energy must be own consumed and the maximum power delivered to the power utility should be less than 150 kW{sub e}. Therefore, generic application tools cannot be applied in this regard. In this work, we develop the MicroG model for planning micro-CHP plants in agreement with the Portuguese energy legal framework. The model is able to design, evaluate and optimize from the techno-economic point of view any micro-CHP plant. MicroG appeals to some data bases, such as micro-cogeneration technologies and power consumption profiles that are also described. In addition, a practical case on a gym is considered to show all the functionalities of the model. The developed model has proven to be extremely useful from the practical point of view. This model could help the development of the micro-CHP Portuguese market, which in turns contributes to accomplish the targets of Kyoto protocol and EU cogeneration Directive. Other improvements to MicroG model can be made in order to enlarge the range of application to other micro-cogeneration technologies and to accomplish with the CO{sub 2} emissions trading. (author)

  6. Planning of micro-combined heat and power systems in the Portuguese scenario

    International Nuclear Information System (INIS)

    Monteiro, Eliseu; Moreira, Nuno Afonso; Ferreira, Sergio

    2009-01-01

    High efficiency cogeneration is seen by the European Commission as part of the solution to increase energy efficiency and improve security of supply in the internal energy markets. Portuguese residential sector has an estimated technical market potential of around 500 MW e for cogeneration of e in size. Additionally, in Portugal there is a specific law for power production in low voltage, where at least 50% of the produced electric energy must be own consumed and the maximum power delivered to the power utility should be less than 150 kW e . Therefore, generic application tools cannot be applied in this regard. In this work, we develop the MicroG model for planning micro-CHP plants in agreement with the Portuguese energy legal framework. The model is able to design, evaluate and optimize from the techno-economic point of view any micro-CHP plant. MicroG appeals to some data bases, such as micro-cogeneration technologies and power consumption profiles that are also described. In addition, a practical case on a gym is considered to show all the functionalities of the model. The developed model has proven to be extremely useful from the practical point of view. This model could help the development of the micro-CHP Portuguese market, which in turns contributes to accomplish the targets of Kyoto protocol and EU cogeneration Directive. Other improvements to MicroG model can be made in order to enlarge the range of application to other micro-cogeneration technologies and to accomplish with the CO 2 emissions trading

  7. Environmental impacts by running an osmotic power plan

    Energy Technology Data Exchange (ETDEWEB)

    Staalstroem, A.; Gitmark, J.

    2012-07-01

    The possible environmental impact by running an osmotic power plant is assessed by using results from monitoring of the prototype plant at Tofte in the Oslofjord, where a water flow of approximately 13 L/s of freshwater is mixed with 20 L/s of saltwater and discharged at 2 m depth. The results from the biological investigations show no impact of the discharge water on the benthic communities in the area. Eutrophication effects near the discharge point are identified as the main environmental concern in an up-scaled power plant. Water samples from the saltwater intake indicate that the phosphorous concentration often is higher at 35 m depth than in the euphotic layer, and there will be a net supply of phosphorous to this layer. By diving the outlet plume below the euphotic zone, eutrophication effects as well as possible effects from use of chemicals and possible changed temperature and salinity in the surface layer is avoided. (Author)

  8. Developing and promoting OKP production system: a JIT production planning approach

    Science.gov (United States)

    Samavati, Mehran

    2011-10-01

    The role of production in competitive system of market on one hand and the changing conditions of market on the other hand has caused the need for more developed planning in such environments. The general purpose of the present research is to realize One-of- a- Kind- Product model (OKP) that is developed in two stages. In OKP model presented in 1994 only one sample of each product is produced and only one production method is considered for each product. In order to make OKP model more real and to use it in promoting more production methods, the following developments were made in this research: 1-First Development: Considering various methods for producing each product. 2-Second Development: Producing more than one sample of each product, while considering various production methods for each product. These models promoted OKP model of 1994. They can be used in more diversified production methods in order to promote them. In present model, while describing the main OKP model new models are provided as well. The significance of OKP has been described in Introduction

  9. Nuclear power plant severe accident research plan. Revision 1

    International Nuclear Information System (INIS)

    Marino, G.P.

    1986-04-01

    Subsequent to the Three Mile Island Unit 2 accident, recommendations were made by a number of review committees to consider regulatory changes which would provide better protection of the public from severe accidents. Over the past six years a major research effort has been underway by the NRC to develop an improved understanding of severe accidents and to provide a technical basis to support regulatory decisions. The purpose of this report is to describe current plans for the completion and extension of this research in support of ongoing regulatory actions in this area

  10. Developing maximal neuromuscular power: part 2 - training considerations for improving maximal power production.

    Science.gov (United States)

    Cormie, Prue; McGuigan, Michael R; Newton, Robert U

    2011-02-01

    This series of reviews focuses on the most important neuromuscular function in many sport performances: the ability to generate maximal muscular power. Part 1, published in an earlier issue of Sports Medicine, focused on the factors that affect maximal power production while part 2 explores the practical application of these findings by reviewing the scientific literature relevant to the development of training programmes that most effectively enhance maximal power production. The ability to generate maximal power during complex motor skills is of paramount importance to successful athletic performance across many sports. A crucial issue faced by scientists and coaches is the development of effective and efficient training programmes that improve maximal power production in dynamic, multi-joint movements. Such training is referred to as 'power training' for the purposes of this review. Although further research is required in order to gain a deeper understanding of the optimal training techniques for maximizing power in complex, sports-specific movements and the precise mechanisms underlying adaptation, several key conclusions can be drawn from this review. First, a fundamental relationship exists between strength and power, which dictates that an individual cannot possess a high level of power without first being relatively strong. Thus, enhancing and maintaining maximal strength is essential when considering the long-term development of power. Second, consideration of movement pattern, load and velocity specificity is essential when designing power training programmes. Ballistic, plyometric and weightlifting exercises can be used effectively as primary exercises within a power training programme that enhances maximal power. The loads applied to these exercises will depend on the specific requirements of each particular sport and the type of movement being trained. The use of ballistic exercises with loads ranging from 0% to 50% of one-repetition maximum (1RM) and

  11. TQC works in newly-built nuclear power plant and main electric power system plannings

    International Nuclear Information System (INIS)

    Akiyama, Yoshihisa; Kawakatsu, Tadashi; Hashimoto, Yasuo

    1985-01-01

    In the Kansai Electric Power Co., Inc., TQC has been introduced to solve such major problems in nuclear power generation as the securing of nuclear power reliability, the suppression of rises in the costs, the reduction in long periods of power failure and the promotion in siting of nuclear power plants. It is thus employed as a means of the ''creation of a slim and tough business constitution''. The state of activities in Kansai Electric are described in quality assurance of a newly-built nuclear power plant and in raising the reliability of the main electric power system to distribute the generated nuclear power and further the future prospects are explained. (Mori, K.)

  12. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    This paper discusses the three different types of productivity programs used at the Wm. H. Zimmer Nuclear Power Station construction site. The Standard Cost Estimate as Productivity Measurement compares actual units installed to estimated units. The Manpower and Equipment Utilization Study measures the present utilization level of the construction work force, identifies opportunities for productivity improvement, and establishes a data base against which future improvements could be made. The special productivity program is a specialized and detailed study of first line supervision. Productivity is defined as the degree of efficiency attained in the use of labor, professional and management skills and knowledge, materials and equipment, and time and money to produce an end result. It is concluded that a more consistent system of productivity measurements needs to be developed and promoted for general use in the construction industry

  13. Reliability evaluation of deregulated electric power systems for planning applications

    International Nuclear Information System (INIS)

    Ehsani, A.; Ranjbar, A.M.; Jafari, A.; Fotuhi-Firuzabad, M.

    2008-01-01

    In a deregulated electric power utility industry in which a competitive electricity market can influence system reliability, market risks cannot be ignored. This paper (1) proposes an analytical probabilistic model for reliability evaluation of competitive electricity markets and (2) develops a methodology for incorporating the market reliability problem into HLII reliability studies. A Markov state space diagram is employed to evaluate the market reliability. Since the market is a continuously operated system, the concept of absorbing states is applied to it in order to evaluate the reliability. The market states are identified by using market performance indices and the transition rates are calculated by using historical data. The key point in the proposed method is the concept that the reliability level of a restructured electric power system can be calculated using the availability of the composite power system (HLII) and the reliability of the electricity market. Two case studies are carried out over Roy Billinton Test System (RBTS) to illustrate interesting features of the proposed methodology

  14. Evaluation of the effectiveness of the implementation of power plans in Kenya

    Energy Technology Data Exchange (ETDEWEB)

    Ruwah, N.; Chang, C., E-mail: ndumzilla@email.kings.ac.kr, E-mail: ckchang@kings.ac.kr [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-07-01

    The purpose of this research is to make an in depth analysis on why developing countries do not seem to move forward towards electric energy security as projected in their energy plans. It is evident that electric energy plan in developing countries do not work very well. Is it because of poor planning or is it due to poor implementation? This research was done with Kenya as the case study. The primary data collection method was interviews of electric energy planners in Kenya. Least cost power development plans and electric energy plans were assessed and compared to what has been actually implemented, according to the plans. After the problem analysis, this research aims at finding possible solutions to the problems. The solutions to be proposed shall be aimed at advising the developing countries' governments, the electric energy planners and policy makers and the relevant stakeholders on the best planning and implementation strategies. (author)

  15. Evaluation of the effectiveness of the implementation of power plans in Kenya

    International Nuclear Information System (INIS)

    Ruwah, N.; Chang, C.

    2014-01-01

    The purpose of this research is to make an in depth analysis on why developing countries do not seem to move forward towards electric energy security as projected in their energy plans. It is evident that electric energy plan in developing countries do not work very well. Is it because of poor planning or is it due to poor implementation? This research was done with Kenya as the case study. The primary data collection method was interviews of electric energy planners in Kenya. Least cost power development plans and electric energy plans were assessed and compared to what has been actually implemented, according to the plans. After the problem analysis, this research aims at finding possible solutions to the problems. The solutions to be proposed shall be aimed at advising the developing countries' governments, the electric energy planners and policy makers and the relevant stakeholders on the best planning and implementation strategies. (author)

  16. Final Report: African Power/Energy and Environmental Development Plan, July 1, 1994 - August 21, 1999

    Energy Technology Data Exchange (ETDEWEB)

    Butler, John M.

    1999-08-21

    In 1994 AEF signed a Cooperative Agreement with DOE to address a program called the African Power /Energy and Environmental Development Plan. The Program initially addressed five area: (1) Historical Black Colleges and Universities Energy/Environmental Program; (2) The Department of Energy and United States Private Industry Africa Program; (3) The Annual United States Energy Study Tour; (4) South African Training Program, and (5) South African Environmental Program. The programs were implemented in conjunction with DOE, institutions, agencies and the private sector support in the USA and within African nations. AEF has worked with government and technical representatives from 13 African nations and expanded the program to address sponsorship of South African students in Historical Black Colleges and Universities, supporting DOE trade missions through participation and planning, and giving presentations in the U.S., and Africa regarding business opportunities in the African energy sector. The programs implemented have also opened doors for the US private sector to seek business opportunities in Africa and for African nations to gain exposure to US products and services.

  17. The design of system for operative planning of blast furnace production process

    Directory of Open Access Journals (Sweden)

    Malindžák Dušan

    1996-12-01

    Full Text Available A system for operative planning of blast furnace production process is described in the paper. The suggested system is based on the use of a new hierarchy of operative plans, consisting of one-month plan, (7+3 days plan, and 24-hour plan. The system allows smoothing of production process at the blast furnace plant, and at the same time satisfies all requirements of the steel plant regarding to the amount of pig iron.

  18. Incorporating energy efficiency into electric power transmission planning: A western United States case study

    International Nuclear Information System (INIS)

    Barbose, Galen L.; Sanstad, Alan H.; Goldman, Charles A.

    2014-01-01

    Driven by system reliability goals and the need to integrate significantly increased renewable power generation, long-range, bulk-power transmission planning processes in the United States are undergoing major changes. At the same time, energy efficiency is an increasing share of the electricity resource mix in many regions, and has become a centerpiece of many utility resource plans and state policies as a means of meeting electricity demand, complementing supply-side sources, and reducing carbon dioxide emissions from the electric power system. The paper describes an innovative project in the western United States to explicitly incorporate end-use efficiency into load forecasts – projections of electricity consumption and demand – that are a critical input into transmission planning and transmission planning studies. Institutional and regulatory background and context are reviewed, along with a detailed discussion of data sources and analytical procedures used to integrate efficiency into load forecasts. The analysis is intended as a practical example to illustrate the kinds of technical and institutional issues that must be addressed in order to incorporate energy efficiency into regional transmission planning activities. - Highlights: • Incorporating energy efficiency into electric power transmission planning is an emergent analytical and policy priority. • A new methodology for this purpose was developed and applied in the western U.S. transmission system. • Efficiency scenarios were created and incorporated into multiple load forecasts. • Aggressive deployment of efficiency policies and programs can significantly reduce projected load. • The approach is broadly applicable in long-range transmission planning

  19. Novel pre-combustion power production : membrane Reactors

    NARCIS (Netherlands)

    Gallucci, F.; Van Sint Annaland, M.

    2015-01-01

    It is well known that conversion of fossil fuels for power production leads to an enormous amount of greenhouse gas emissions widely accepted as responsible for climate change. As fossil fuels will remain the primary energy source for the next decades, different studies are ongoing to make the

  20. Relation between source term and emergency planning for nuclear power plants

    International Nuclear Information System (INIS)

    Shi Zhongqi; Yang Ling

    1992-01-01

    Some background information of the severe accidents and source terms related to the nuclear power plant emergency planning are presented. The new source term information in NUREG-0956 and NUREG-1150, and possible changes in emergency planning requirements in U.S.A. are briefly provided. It is suggested that a principle is used in selecting source terms for establishing the emergency planning policy and a method is used in determining the Emergency Planning Zone (EPZ) size in China. Based on the research results of (1) EPZ size of PWR nuclear power plants being built in China, and (2) impact of reactor size and selected source terms on the EPZ size, it is concluded that the suggested principle and the method are suitable and feasible for PWR nuclear power plants in China

  1. Overview Of Planning Direction Of Nuclear Power Development In Vietnam In The Period Up To 2030

    International Nuclear Information System (INIS)

    Ta Van Huong; Tran Hong Nguyen

    2011-01-01

    Research for peaceful application of nuclear energy, in general, and in particular, for construction of nuclear power plants (NPP) in Vietnam is urgent for social-economic development and for meeting the increasing national electrical demand in future. The expected plan for developing NPPs in Vietnam is defined in the Planning Direction of Nuclear Power Development in Vietnam in the period up to 2030. In according to which, NPPs have been planned in selected sites by the period depends on the detailed conditions of each site, as well as on specification of the national electrical grid. The present report reviews the highlights of this Planning Direction of Nuclear Power Development in Vietnam in the period up to 2030. (author)

  2. Power generation versus fuel production in light water hybrid reactors

    International Nuclear Information System (INIS)

    Greenspan, E.

    1977-06-01

    The economic potentials of fissile-fuel-producing light-water hybrid reactors (FFP-LWHR) and of fuel-self-sufficient (FSS) LWHR's are compared. A simple economic model is constructed that gives the capital investment allowed for the hybrid reactor so that the cost of electricity generated in the hybrid based energy system equals the cost of electricity generated in LWR's. The power systems considered are LWR, FSS-LWHR, and FFP-LWHR plus LWR, both with and without plutonium recycling. The economic potential of FFP-LWHR's is found superior to that of FSS-LWHR's. Moreover, LWHR's may compete, economically, with LWR's. Criteria for determining the more economical approach to hybrid fuel or power production are derived for blankets having a linear dependence between F and M. The examples considered favor the power generation rather than fuel production

  3. The power of design product innovation in sustainable energy technologies

    CERN Document Server

    Reinders, Angele H; Brezet, Han

    2012-01-01

    The Power of Design offers an introduction and a practical guide to product innovation, integrating the key topics that are necessary for the design of sustainable and energy-efficient products using sustainable energy technologies. Product innovation in sustainable energy technologies is an interdisciplinary field. In response to its growing importance and the need for an integrated view on the development of solutions, this text addresses the functional principles of various energy technologies next to the latest design processes and innovation methods. From the perspec

  4. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    There is no single satisfactory way to measure productivity in the construction industry. The industry is too varied, too specialized and too dependent upon vast numbers of interrelations between trades, contractors, designers and owners. Hence, no universally reliable indices for measuring construction productivity has been developed. There are problems that are generic to all large union-built nuclear power plants. The actions of any one owner cannot rectify the shortcomings of the construction industry. The generic problems are being identified, and many national organizations are attempting to make the construction industry more productive by recommending various changes

  5. Study on optimization of normal plant outage work plan for nuclear power plants

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Kodama, Noriko; Takase, Kentaro; Miya, Kenzo

    2011-01-01

    This paper discusses maintenance optimization in maintenance implementation stage following maintenance planning stage in nuclear power plants and proposes a methodology to get an optimum maintenance work plan. As a result of consideration, the followings were obtained. (1) The quantitative evaluation methodology for optimizing maintenance work plan in nuclear power plants was developed. (2) Utilizing the above methodology, a simulation analysis of maintenance work planning for BWR's PLR and RHR systems in a normal plant outage was performed. Maintenance cost calculation in several cases was carried out on the condition of smoothening man loading over the plant outage schedule as much as possible. (3) As a result of the simulation, the economical work plans having a flat man loading over the plant outage schedule were obtained. (author)

  6. Functional overview of the Production Planning Model (ProdMod)

    International Nuclear Information System (INIS)

    Gregory, M.V.; Paul, P.K.

    1995-09-01

    The Production Planning Model (ProdMod) has been developed by SRTC for use by High Level Waste Program Management and High Level Waste Engineering as a fast running, integrated, comprehensive model of the entire SRS high level waste (HLW) complex. ProdMod can simulate the response of the HLW complex from its current state to the end of tank clean-up or to any intermediate point. The present document describes the initial release of ProdMod at the end of FY95: a model version that contains all the significant elements from the High-level Waste System Plan Revision 5 and is capable of running the simulation all the way to the postulated completion of waste removal. For the scenario represented by this release, that simulates approximately 70 years of operation of the HLW complex (out to FY2065). This initial release of ProdMod will serve as the immediate starting point for the modeling of the High-Level Waste System Plan Revision 6. Thus ProdMod is expected to be in a state of continuous change and improvement.the initial goal has been to generate a simulation of the processes of interest, with the emphasis on mass and volume balances tracked throughout the HLW complex. That has been accomplished. Future development will add a set of cost equations to the process equations and extend the model for use as a linear programming (optimization) application. The goal of this later phase will be to free the ProdMod user to some extent from the need to set up detailed simulation scenarios: the model will automatically make operational choices which minimize or maximize a given objective function. Appendix A contains the source code

  7. Forecast of wind energy production and ensuring required balancing power

    International Nuclear Information System (INIS)

    Merkulov, M.

    2010-01-01

    The wind energy is gaining larger part of the energy mix around the world as well as in Bulgaria. Having in mind the irregularity of the wind, we are in front of a challenge for management of the power grid in new unknown conditions. The world's experience has proven that there could be no effective management of the grid without forecasting tools, even with small scale of wind power penetration. Application of such tools promotes simple management of large wind energy production and reduction of the quantities of required balancing powers. The share of the expenses and efforts for forecasting of the wind energy is incomparably small in comparison with expenses for keeping additional powers in readiness. The recent computers potential allow simple and rapid processing of large quantities of data from different sources, which provides required conditions for modeling the world's climate and producing sophisticated forecast. (author)

  8. Nuclear power planning study for Indonesia (Java Island)

    International Nuclear Information System (INIS)

    1976-01-01

    The major objective of the study is to determine the optimum timing and size of nuclear size of nuclear power plants that could be built on Java Island during the period 1978-1997. The study could also be considered as a general survey of the available energy resources in the country. Included are economic background, rational energy resources, electricity supply system on Java Island, forecast of electric energy demand, methodology and basis for evaluation, frequency stability analysis and results of analysis. In 8 appendixes technical, economic and financial aspects of the demand for electrical energy are discussed

  9. Plans for first oil production revived in two Sudanese fields

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    A Vancouver, British Columbia, independent and its Sudanese partner have filed a development plan with the government of Sudan to produce an initial 40,000 b/d from Heglig and Unity oil fields in Sudan. Arakis Energy Corp., and the private Sudanese company State Petroleum Corp. (SPC) want to begin the first commercial hydrocarbon production in the destitute, war torn country. They are picking up where Chevron Corp. left off after years of grappling with an ambitious, costly - and ultimately futile - effort to export crude-oil from Sudan. After finding almost 300 million bbl of oil in Sudan during the early 1980s, Chevron scuttled a $2 billion project to export 50,000 b/d of Sudanese crude in 1986. It drilled 90 wells and sank more than $1 billion into the project. But it dropped the plan, citing the 1986 collapse of oil prices and concerns over security after repeated guerrilla attacks delayed work. The paper details the project

  10. Offshore grid transmission planning using approximated HVDC power flows

    Energy Technology Data Exchange (ETDEWEB)

    Torbaghan, Shahab Shariat; Rawn, Barry G.; Gibescu, Madeleine; Meijden, Mart van der [Delft Univ. of Technology (Netherlands). Dept. of Electrical Sustainable Energy

    2012-07-01

    In this paper we introduce an optimization framework which determines a socially optimum design of a HVDC offshore grid, under the assumption of a centralized network expansion planning scheme. This gives the optimum grid topology and interconnections capacity. In addition, the analytical solution to the optimization problem yields a market structure that expresses the relationship between the different regions' electricity prices and congestion charges associated with the interconnections. The optimization model sets the transmission capacities in a way that congestion shadow prices to be collected by the end of the economic lifetime of the project pay off the initial investment capital. We use this framework to study the impact of exercising different dispatching policies on the optimum design of the grid. The framework is applied to a multi-bus test system that functions under 8 different time periods. (orig.)

  11. Indices for planning wind power generation; Furyoku hatsuden no keikaku shihyo

    Energy Technology Data Exchange (ETDEWEB)

    Takeuchi, H

    1997-11-25

    Outlined herein are status of wind power generation development, indices for planning development, and actual development results. At present, wind power generates electric power of 6,781MW worldwide. USA has been rapidly developing wind power generation since enactment of the PURPA law, and accounted for 25% of the world output in the past. However, the county is recently unseated from the world top position by Germany, which has been extensively developing wind power generation since enactment of the EFL law to reach 1,799MW. In Japan, electric power companies, local governments and public institutions have been positively introducing wind mills since 1992, when Tohoku Electric Power Co. built Ryuhi Wind Park, now generating a total power of 15MW by 64 units located at 33 different points. According to the surveys by NEDO on wind conditions, there are a number of districts suited for wind mills in Hokkaido, Tohoku, Okinawa and sea areas in Honshu. The indices described herein for planning wind power generation include rotor diameter, tower height, speed of rotation, weight, power to be generated, utilization and service factors, noise level, and investment and running costs. In the present state of the development of wind power generation in Japan, development points are 33, generated ouptut 15,097kW and units 64. 14 figs.

  12. Incorporating global warming risks in power sector planning: A case study of the New England region

    International Nuclear Information System (INIS)

    Krause, F.; Busch, J.; Koomey, J.

    1992-11-01

    The following topics are described in reference to electric power production in New England: Fuel Prices; Emission Factors and Externality Surcharges; Cost and Potential of Demand-Site Efficiency Improvements; Fuel Switching; Conventional Utility Generation; Gas Supply Constraints; Cogeneration Potential; Biomass Resources; Potential Power Production from Municipal Solid Waste; and Wind Resource Potential

  13. The present power production system would meet only 60% of the power demand in 2025

    International Nuclear Information System (INIS)

    Anon.

    2012-01-01

    According to the head of EDF, H. Proglio, the power consumption in France would increase by 40% by 2025 because of the expected growth of the population (+9%) and of the economic growth and despite the efforts for energy sparing. The government's objective of only 50% of nuclear power in 2025 instead of today's 75% would be reached naturally without decommissioning other plant than Fessenheim. Nuclear power has shown its efficiency since electricity price in France is 40% less high than the European average price. EDF has launched a 50 billion euros investment program in order to replace main components of nuclear power plants by 2025. This program will generate 20.000 new jobs in addition to the 30.000 people hired to replace retired staff. For the head of EDF, the real question is more how to produce the future needed power than how to suppress existing means of production. (A.C.)

  14. Hybrid production planning system in make-to-order company - case study

    Directory of Open Access Journals (Sweden)

    2010-12-01

    Full Text Available This paper presents hybrid production planning and shop floor control system in make-to-order manufacturing of complex products. It presents the general idea of multi-hybrid system and selected practical aspects of its creation and its implementation. The construction of this system is based on the planning and executive levels and main aspects of its integration and its support tools. The research was carried out in HCP S.A. Poznan (Diesel Engines and Generating Sets Factory. HCP S.A. Poznan is the producer of high-power marine engines. The lead-time of the final product manufacturing is between 9 months and 1 year, and takes about 40.000 hours per one engine. The main problems of this production system are high share of the work in progress and long lead-time, which, as a result, causes many expenses. The flow of material streams is extremely complex and represents "A-plant" class, according to V-A-T classification, including significant internal constraints ("bottlenecks".

  15. Integrated multiperiod power generation and transmission expansion planning with sustainability aspects in a stochastic environment

    International Nuclear Information System (INIS)

    Seddighi, Amir Hossein; Ahmadi-Javid, Amir

    2015-01-01

    This paper presents a multistage stochastic programming model to address sustainable power generation and transmission expansion planning. The model incorporates uncertainties about future electricity demand, fuel prices, greenhouse gas emissions, as well as possible disruptions to which the power system is subject. A number of sustainability regulations and policies are considered to establish a framework for the social responsibility of the power system. The proposed model is applied to a real-world case, and several sensitivity analyses are carried out to provide managerial insights into different aspects of the model. The results emphasize the important role played by sustainability policies on the configuration of the power grid. - Highlights: • This paper considers integrated power generation and transmission expansion planning. • Sustainability aspects are incorporated into a multiperiod stochastic setting. • A stochastic mathematical programming model is developed to address the problem. • The model is applied to a real-world case and numerical studies are carried out

  16. Visions, Scenarios and Action Plans Towards Next Generation Tanzania Power System

    Directory of Open Access Journals (Sweden)

    Alex Kyaruzi

    2012-10-01

    Full Text Available This paper presents strategic visions, scenarios and action plans for enhancing Tanzania Power Systems towards next generation Smart Power Grid. It first introduces the present Tanzanian power grid and the challenges ahead in terms of generation capacity, financial aspect, technical and non-technical losses, revenue loss, high tariff, aging infrastructure, environmental impact and the interconnection with the neighboring countries. Then, the current initiatives undertaken by the Tanzania government in response to the present challenges and the expected roles of smart grid in overcoming these challenges in the future with respect to the scenarios presented are discussed. The developed scenarios along with visions and recommended action plans towards the future Tanzanian power system can be exploited at all governmental levels to achieve public policy goals and help develop business opportunities by motivating domestic and international investments in modernizing the nation’s electric power infrastructure. In return, it should help build the green energy economy.

  17. Biomass Supply Planning for Combined Heat and Power Plants using Stochastic Programming

    DEFF Research Database (Denmark)

    Guericke, Daniela; Blanco, Ignacio; Morales González, Juan Miguel

    method using stochastic optimization to support the biomass supply planning for combined heat and power plants. Our two-phase approach combines mid-term decisions about biomass supply contracts with the short-term decisions regarding the optimal market participation of the producer to ensure......During the last years, the consumption of biomass to produce power and heat has increased due to the new carbon neutral policies. Nowadays, many district heating systems operate their combined heat and power (CHP) plants using different types of biomass instead of fossil fuel, especially to produce......, and heat demand and electricity prices vary drastically during the planning period. Furthermore, the optimal operation of combined heat and power plants has to consider the existing synergies between the power and heating systems while always fulfilling the heat demand of the system. We propose a solution...

  18. 15 CFR 713.4 - Advance declaration requirements for additionally planned production, processing, or consumption...

    Science.gov (United States)

    2010-01-01

    ... additionally planned production, processing, or consumption of Schedule 2 chemicals. 713.4 Section 713.4..., processing, or consumption of Schedule 2 chemicals. (a) Declaration requirements for additionally planned activities. (1) You must declare additionally planned production, processing, or consumption of Schedule 2...

  19. Wind energy in electric power production. Preliminary study

    Energy Technology Data Exchange (ETDEWEB)

    Lento, R; Peltola, E

    1984-01-15

    The wind speed conditions in Finland have been studied with the aid of the existing statistics of the Finnish Meteorological Institute. With the aid of the statistics also estimates on the available wind energy were made. 800 wind power plants, 1.5 MW each, on the windiest west coast would produce about 2 TWh energy per year. Far more information on the temporal, geographical and vertical distribution of the wind speed than the present statistics include is needed when the available wind energy is estimated, when wind power plants are dimensioned optimally, and when suitable locations are chosen for them. The investment costs of a wind power plant increase when the height of the tower or the diameter of the rotor is increased, but the energy production increases, too. Thus, overdimensioning the wind power plant in view of energy needs or the wind conditions causes extra costs. The cost of energy produced by wind power can not yet compete with conventional energy, but the situation changes to the advantage of wind energy, if the real price of the plants decreases (among other things due to large series production and increasing experience), or if the real price of fuels rises. The inconvinience on the environment caused by the wind power plants is considered insignificant. The noise caused by the plant attenuates rapidly with distance. No harmful effects birds and other animals caused by the wind power plants have been observed in the studies made abroad. Parts of a plant getting loose during an accident, or ice forming on the blades are estimated to fly even from a large plant only a few hundred meters.

  20. Wind power: Italian auto-production legislation (ISES convention)

    International Nuclear Information System (INIS)

    Mari, G.

    1991-01-01

    With reference to what was discussed at the Bologna (Italy) June 1991 ISES (International Solar Energy Society) convention on wind energy, this paper summarizes the Italian legislative framework relative to on-site power generation and outlines the National Energy Plan objectives regarding the promotion of the use, by industry, of renewable energy sources. Brief notes are also provided on wind energy promotional activities being carried out by ENEL (the Italian National Energy Board), ENEA (Italian Agency for New Technologies, Energy and the Environment), and EWEA (the European Wind Energy Association)

  1. Fuzzy production planning models for an unreliable production system with fuzzy production rate and stochastic/fuzzy demand rate

    Directory of Open Access Journals (Sweden)

    K. A. Halim

    2011-01-01

    Full Text Available In this article, we consider a single-unit unreliable production system which produces a single item. During a production run, the production process may shift from the in-control state to the out-of-control state at any random time when it produces some defective items. The defective item production rate is assumed to be imprecise and is characterized by a trapezoidal fuzzy number. The production rate is proportional to the demand rate where the proportionality constant is taken to be a fuzzy number. Two production planning models are developed on the basis of fuzzy and stochastic demand patterns. The expected cost per unit time in the fuzzy sense is derived in each model and defuzzified by using the graded mean integration representation method. Numerical examples are provided to illustrate the optimal results of the proposed fuzzy models.

  2. The long term plan for the integration of nuclear power plants into the Turkish Electrical Power System

    International Nuclear Information System (INIS)

    Kutukcuoglu, A.

    1974-03-01

    The report covers in detail the study of the expansion of the Turkish Electric Power System for the period 1980-1987. Load forecast is done by sectors and regions and inter-regions power balances gave the basis for the high voltage network configurations. Expansion alternatives are defined giving priority to hydroelectric projects, to local resources and nuclear power plants concurrently with conventional plants (lignite and oil). Several reactor strategies are analysed with LWR, HWR, FBR and HTGR power plants. Present worth value method is used for comparison of alternatives and sensitivity analysis is done for those ranked in the first places. Load flow, transient stability and frequency deviation studies of the power system are studied carefully by means of A.C. calculator and digital computer codes in order to see the influence of the introduction of large-sized power plants (600-750MW(e)) and their location in the power system. A 600MW(e) nuclear plant in 1983 and a second one of 750MW(e) in 1987 should, it is found, be commissioned into the system. The economic optimization was done with two computer programmes developed by KFA (Juelich): IACO for fuelling nuclear plant and RESTRAPO for power system with high hydroelectric component. The report is bound in three volumes: Volume I: Summary and Conclusions; Volume II: System Planning; Volume III: Electrical Survey

  3. Practice of building production planning system of company with a wide range of products - case study

    Directory of Open Access Journals (Sweden)

    Łukasz Hadaś

    2012-09-01

    Full Text Available Background: The complexity of the manufacturing environments of today's mechanical engineering companies and the number of both internal and external restrictions affecting to need of building tailored production planning and control systems. This statement is particularly important in conditions of companies with a wide range of products and different customer service strategies (different locations of the logistics decoupling point otherwise called "order penetration point". Streams of materials in these conditions require different management what is the main reason for carrying out research in business conditions by the authors. Material and methods: The research was carried out in industrial engineering in complex environmental conditions of production. This was a specializing in technology, multi-departments environment, with multiple streams of values and a wide range of products (about 500 items. The work was carried out under the transformation of the production system from the "push" logic of flow to "pull" logic of flow and building a dedicated system based on the best practice approach. Results: The paper describes the process of building tailored hybrid systems in the area of planning and shop flow control of production. The authors present the theoretical considerations on the issue and practical experiences. The authors present factors of selection of the transformation path and its road map. The article describes the part of the authors' own experience in the work on the methodology of transformation of Polish companies in the running business condition. Conclusions: Establishing the methodology of transformation of the production system is not a simple task. This paper presents only selected aspects of complex decision-making process. However, the authors presented work shows the important aspect of the transformation of production systems for these organizational conditions.

  4. Power technology complex for production of motor fuel from brown coals with power supply from NPPs

    International Nuclear Information System (INIS)

    Troyanov, M.F.; Poplavskij, V.M.; Sidorov, G.I.; Bondarenko, A.V.; Chebeskov, A.N.; Chushkin, V.N.; Karabash, A.A.; Krichko, A.A.; Maloletnev, A.S.

    1998-01-01

    With the present-day challenge of efficient use of low-grade coals and current restructuring of coal industry in the Russian Federation, it is urgent to organise the motor fuel production by the synthesis from low grade coals and heavy petroleum residues. With this objective in view, the Institute of Physics and Power Engineering of RF Minatom and Combustible Resources Institute of RF Mintopenergo proposed a project of a standard nuclear power technology complex for synthetic liquid fuel (SLF) production using fast neutron reactors for power supply. The proposed project has two main objectives: (1) Engineering and economical optimization of the nuclear power supply for SLF production; and (2) Engineering and economical optimization of the SLF production by hydrogenisation of brown coals and heavy petroleum residues with a complex development of advanced coal chemistry. As a first approach, a scheme is proposed with the use of existing reactor cooling equipment, in particular, steam generators of BN-600, limiting the effect on safety of reactor facility operation at minimum in case of deviations and abnormalities in the operation of technological complex. The possibility to exclude additional requirements to the equipment for nuclear facility cooling was also taken into account. It was proposed to use an intermediate steam-water circuit between the secondary circuit sodium and the coolant to heat the technological equipment. The only change required for the BN-600 equipment will be the replacement of sections of intermediate steam superheaters at the section of main steam superheaters. The economic aspects of synthetic motor fuel production proposed by the joint project depend on the evaluation of integral balances: thermal power engineering, chemical technology, the development of advanced large scale coal chemistry of high profitability; utilisation of ash and precious microelements in waste-free technology; production of valuable isotopes; radical solution of

  5. Revised Environmental Assessment for the Sacramento Area Office Western Area Power Administration, 1994 Power Marketing Plan

    International Nuclear Information System (INIS)

    1992-08-01

    This document presents information on power marketing; expiring contracts; economic methods and assumptions; detailed power supply cost data; guidelines and acceptance criteria for conservation and renewable energy projects; hourly flow impacts graphs; difference in hydro dispatch; generation data; flow data; fishery resources of the Sacramento River; and water quality

  6. Evaluation of wind power planning in Denmark – Towards an integrated perspective

    DEFF Research Database (Denmark)

    Sperling, Karl; Hvelplund, Frede; Mathiesen, Brian Vad

    2010-01-01

    Wind power is a maturing technology that may form an essential element of fully renewable energy systems in a number of countries. Denmark has a long history of wind power development and is planning to expand its existing capacity. If large-scale penetration of wind power is to be achieved......, an integrated framework is needed that can respond to the associated challenges. This paper argues for adopting an integrated macro perspective when evaluating and building frameworks to support wind power development. This macro perspective is applied to the case of Denmark, and more specifically to concrete...

  7. Failures of knowledge production in nuclear power risk management

    International Nuclear Information System (INIS)

    Sanne, Johan M.

    2008-09-01

    Risks are ascribed in processes of knowledge production, where risk objects are defined and measures taken. This knowledge is also the basis for regulatory action. Thus, uncertainties in knowledge production, based upon choices of assumptions, methods, calculations and evidence criteria for reliable data create vulnerabilities for risk management and risk regulation. A recent incident in Swedish nuclear power plant provides an opportunity to develop theories of knowledge production in complex organizations. Knowledge modes within nuclear power can be characterized as either calculated logics where evidence claims need numbers, real time logics based upon subtle signals and tacit knowledge or as policy logics, navigating between internal and external demands for safety, trustworthiness and profit. The plant had neither foreseen the triggering event nor designed the plant to withstand it. I analyze how the plant and the regulator have interpreted the event, its significance and the measures taken to prevent similar events. I also discuss alternative interpretations, lack of knowledge and the generic deficiencies in knowledge production that the event indicates. First, the plant was not as robustly designed as expected. Deficiencies in diversification may have been caused by overconfidence in the reliability of its design. Second, inadequate design was ascribed to various deficient knowledge production processes: original design of the plant, reconstruction or caused by inadequate learning from previous events. The failures in knowledge production were probably caused by insufficient integration of different knowledge processes and limitations in engineering analysis. Knowledge about risks from nuclear power operations is mainly based upon calculations and simulations, not upon real events. But knowledge and design could be improved also without accidents. Control room operators and maintenance staff can provide invaluable knowledge and methods; to improve causal

  8. Failures of knowledge production in nuclear power risk management

    Energy Technology Data Exchange (ETDEWEB)

    Sanne, Johan M.

    2008-09-15

    Risks are ascribed in processes of knowledge production, where risk objects are defined and measures taken. This knowledge is also the basis for regulatory action. Thus, uncertainties in knowledge production, based upon choices of assumptions, methods, calculations and evidence criteria for reliable data create vulnerabilities for risk management and risk regulation. A recent incident in Swedish nuclear power plant provides an opportunity to develop theories of knowledge production in complex organizations. Knowledge modes within nuclear power can be characterized as either calculated logics where evidence claims need numbers, real time logics based upon subtle signals and tacit knowledge or as policy logics, navigating between internal and external demands for safety, trustworthiness and profit. The plant had neither foreseen the triggering event nor designed the plant to withstand it. I analyze how the plant and the regulator have interpreted the event, its significance and the measures taken to prevent similar events. I also discuss alternative interpretations, lack of knowledge and the generic deficiencies in knowledge production that the event indicates. First, the plant was not as robustly designed as expected. Deficiencies in diversification may have been caused by overconfidence in the reliability of its design. Second, inadequate design was ascribed to various deficient knowledge production processes: original design of the plant, reconstruction or caused by inadequate learning from previous events. The failures in knowledge production were probably caused by insufficient integration of different knowledge processes and limitations in engineering analysis. Knowledge about risks from nuclear power operations is mainly based upon calculations and simulations, not upon real events. But knowledge and design could be improved also without accidents. Control room operators and maintenance staff can provide invaluable knowledge and methods; to improve causal

  9. A game-theoretical model of private power production

    International Nuclear Information System (INIS)

    Xing, W.; Wu, F.F.

    2001-01-01

    Private power production has sprung up all over the world. The build-operate-transfer (BOT) arrangement has emerged as one of the most important options for private power production, especially in developing countries with rapidly growing demand and financial shortages. Based on oligopoly theory, the paper proposes a Stackelberg game model between a BOT investor and an electric utility whereby they can negotiate a long-term energy contract. Asymmetric pricing schemes are taken into account such that a host utility purchases electricity from a BOT company at its ''avoided cost'', and sells its electricity to end users at its ''average cost''. Our Stackelberg game model is transferred into a two-level optimization problem, and then solved by an iterative algorithm. The game model is demonstrated by an illustrative example. (author)

  10. A game-theoretical model of private power production

    Energy Technology Data Exchange (ETDEWEB)

    Xing, W.; Wu, F.F. [University of Hong Kong (China). Dept. of Electrical and Electronic Engineering

    2001-03-01

    Private power production has sprung up all over the world. The build-operate-transfer (BOT) arrangement has emerged as one of the most important options for private power production, especially in developing countries with rapidly growing demand and financial shortages. Based on oligopoly theory, the paper proposes a Stackelberg game model between a BOT investor and an electric utility whereby they can negotiate a long-term energy contract. Asymmetric pricing schemes are taken into account such that a host utility purchases electricity from a BOT company at its ''avoided cost'', and sells its electricity to end users at its ''average cost''. Our Stackelberg game model is transferred into a two-level optimization problem, and then solved by an iterative algorithm. The game model is demonstrated by an illustrative example. (author)

  11. Market potential of IGCC for domestic power production

    International Nuclear Information System (INIS)

    Gray, D.; Tomlinson, G.; Hawk, E.; Maskew, J.

    1999-01-01

    Mitretek Systems and CONSOL Inc. have completed the first phase of a market potential study for Integrated Coal Gasification Combined Cycle (IGCC) domestic power production. The U. S. Department of Energy (DOE) funded this study. The objective of this study is to provide DOE with data to estimate the future domestic market potential of IGCC for electricity generation. Major drivers in this study are the state of technology development, feedstock costs, environmental control costs, demand growth, and dispatchability. This study examines IGCC potential for baseload power production in the Northeast U. S., an important market area by virtue of existing coal infrastructure and proximity to coal producing regions. IGCC market potential was examined for two levels of technology development as a function of natural gas price and carbon tax. This paper discusses the results of this study, including the levels of performance and cost necessary to insure competitiveness with natural gas combined cycle plants

  12. Enhanced Passive Cooling for Waterless-Power Production Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, Salvador B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-14

    Recent advances in the literature and at SNL indicate the strong potential for passive, specialized surfaces to significantly enhance power production output. Our exploratory computational and experimental research indicates that fractal and swirl surfaces can help enable waterless-power production by increasing the amount of heat transfer and turbulence, when compared with conventional surfaces. Small modular reactors, advanced reactors, and non-nuclear plants (e.g., solar and coal) are ideally suited for sCO2 coolant loops. The sCO2 loop converts the thermal heat into electricity, while the specialized surfaces passively and securely reject the waste process heat in an environmentally benign manner. The resultant, integrated energy systems are highly suitable for small grids, rural areas, and arid regions.

  13. Monte Carlo simulation techniques for predicting annual power production

    International Nuclear Information System (INIS)

    Cross, J.P.; Bulandr, P.J.

    1991-01-01

    As the owner and operator of a number of small to mid-sized hydroelectric sites, STS HydroPower has been faced with the need to accurately predict anticipated hydroelectric revenues over a period of years. The typical approach to this problem has been to look at each site from a mathematical deterministic perspective and evaluate the annual production from historic streamflows. Average annual production is simply taken to be the area under the flow duration curve defined by the operating and design characteristics of the selected turbines. Minimum annual production is taken to be a historic dry year scenario and maximum production is viewed as power generated under the most ideal of conditions. Such an approach creates two problems. First, in viewing the characteristics of a single site, it does not take into account the probability of such an event occurring. Second, in viewing all sites in a single organization's portfolio together, it does not reflect the varying flow conditions at the different sites. This paper attempts to address the first of these two concerns, that being the creation of a simulation model utilizing the Monte Carlo method at a single site. The result of the analysis is a picture of the production at the site that is both a better representation of anticipated conditions and defined probabilistically

  14. Cogeneration Power Plants: a Proposed Methodology for Unitary Production Cost

    International Nuclear Information System (INIS)

    Metalli, E.

    2009-01-01

    A new methodology to evaluate unitary energetic production costs in the cogeneration power plants is proposed. This methodology exploits the energy conversion factors fixed by Italian Regulatory Authority for Electricity and Gas. So it allows to settle such unitary costs univocally for a given plant, without assigning them a priori subjective values when there are two or more energy productions at the same time. Moreover the proposed methodology always ensures positive values for these costs, complying with the total generation cost balance equation. [it

  15. Plan of disaster prevention in district of Shizuoka Prefecture countermeasures to nuclear power. 1984 ed.

    International Nuclear Information System (INIS)

    1984-01-01

    Based on the basic act for disaster countermeasures, this plan aimes at establishing the necessary system concerning the countermeasures for preventing the disaster due to the release of a large quantity of radioactive substances from the Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., determining the measures to be taken for disaster prevention, and striving for the safety of inhabitants by executing the deskworks and services of the disaster prevention related to nuclear power synthetically and purposefully. The general matters concerning the disaster prevention in the district of Shizuoka Prefecture are determined in the ''Plan of disaster prevention in the district of Shizuoka Prefecture (General countermeasures)'', but in view of the peculiarity of nuclear power disaster, the peculiar matters are to be determined in this plan. The general rules on the works of respective disaster prevention organizations, the countermeasures for preventing nuclear power disaster, the emergency countermeasures to nuclear power disaster, the countermeasures to Tokai earthquakes and the countermeasures for restoration after nuclear power disaster are stipulated. (Kako, I.)

  16. Planning and Resource Management in an Intelligent Automated Power Management System

    Science.gov (United States)

    Morris, Robert A.

    1991-01-01

    Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

  17. Power plant project success through total productive generation

    Energy Technology Data Exchange (ETDEWEB)

    Kaivola, R.; Tamminen, L.

    1996-11-01

    The Total Productive Generation concept (TPG) defines the lines of action adopted by IVO Generation Services Ltd (IGS) for the operation and maintenance of power plants. The TPG concept is based on procedures tested in practice. The main idea of TPG is continuous development of quality, which is a joint effort of the entire staff. Its objective is to benefit IGS`s own staff and, in particular, the company`s customers. (orig.)

  18. Chitin Lengthens Power Production in a Sedimentary Microbial Fuel Cell

    Science.gov (United States)

    2014-01-01

    organic carbon sediments demonstrate that chitin enhances and lengthens power production. Keywords—chitin; MFC; microbiology ; iron-reducing bacteria...levels of organic content available as a food source for bacteria in the sediment. Dependent upon applications, there are scenarios where a SMFC...as ethanol, molasses, or vegetable oils. In the case of underwater marine sediment, options for carbon amendment are limited to solid carbon

  19. Foreword for the Special Section on Power System Planning and Operation Towards a Low-Carbon Economy

    Energy Technology Data Exchange (ETDEWEB)

    Ding, Yi; Kang, Chongqing; Wang, Jianhui; Chen, Yihsu; Hobbs, Benjamin F.

    2015-03-01

    The nine papers in this special section on power system planning and operation towards a low-cost economy cover the following topics: power system planning models; power system operation methods and market behavior analysis; and risk assessment and emission management.

  20. New fire and security rules change USA nuclear power plant emergency plans

    International Nuclear Information System (INIS)

    Garrou, A.L.

    1978-01-01

    New safety and security rules for nuclear power plants have resulted from the Energy Reorganisation Act and also from a review following the Browns Ferry fire. The content of the emergency plan which covers personnel, plant, site, as well as a general emergency, is outlined. New fire protection rules, the plan for security, local and state government assistance are also discussed, with a brief reference to the impact of the new rules on continuity of operations. (author)