WorldWideScience

Sample records for planning reliability improvement

  1. ERP application of real-time vdc-enabled last planner system for planning reliability improvement

    DEFF Research Database (Denmark)

    Cho, S.; Sørensen, Kristian Birch; Fischer, M.

    2009-01-01

    The Last Planner System (LPS) has since its introduction in 1994 become a widely used method of AEC practitioners for improvement of planning reliability and tracking and monitoring of project progress. However, the observations presented in this paper indicate that the last planners...... and coordinators are in need of a new system that integrates the existing LPS with Virtual Design and Construction (VDC), Enterprise Resource Planning (ERP) systems, and automatic object identification by means of Radio Frequency Identification (RFID) technology. This is because current practice of the LPS...... implementations is guesswork-driven, textual report-generated, hand-updated, and even interpersonal trust-oriented, resulting in less accurate and reliable plans. This research introduces a prototype development of the VREL (VDC + RFID + ERP + LPS) integration to generate a real-time updated cost + physical...

  2. Reducing variability of workforce as a tool to improve plan reliability

    DEFF Research Database (Denmark)

    Wandahl, Søren; Yicheng, S.; Zygmunt, K. J.

    Variability of flow is recognized as the greatest obstacle to production management. Since the work flow and labour flow are two dominators of work performance, it is important to manage them simultaneously. The objective of this paper is to examine whether by reducing the variance of a labour flow......, a plan reliability can be improved, therefore, three different construction labour data sets have been examined by utilizing Monte Carlo Simulation, to analyze the probability to finish simulated projects within a certain time. The research findings revealed that reducing variance in the workforce flow...... does not necessarily shorten the project length, nevertheless it increases probability to finish the tasks within a critical path duration. Additionally, it was concluded, that reducing the variance of crew allocation can improve the productivity....

  3. Reducing Variability of Workforce as a Tool to Improve Plan Reliability

    DEFF Research Database (Denmark)

    Shen, Yicheng; Zygmunt, Katarzyna Julia; Wandahl, Søren

    2017-01-01

    Variability of flow is recognized as one of the greatest obstacles to production management. Since the work flow and labour flow are two dominators of work performance, it is important to manage them simultaneously. The objective of this paper is to examine if an increased plan reliability could...... of the workforce flow does not necessarily shorten the project length, nevertheless it increases probability to finish the tasks within a critical path duration. Additionally, it was concluded, that reducing the variance of crew allocation can improve the productivity....... be reached by reducing the variance of a labour flow. Therefore, three different construction labour data sets have been examined by utilizing Monte Carlo Simulation, to analyze the probability to finish simulated projects within a certain time. The research findings revealed that reducing variance...

  4. Reliability improvement: where do we go from here

    International Nuclear Information System (INIS)

    Haueter, R.L.

    1976-01-01

    The present programs and the future plans in the area of power-plant productivity and reliability data collection and analyses are discussed. The shortcomings of the past industry efforts toward improving plant productivity are described, and some suggestions for improvement are presented

  5. Reliability criteria selection for integrated resource planning

    International Nuclear Information System (INIS)

    Ruiu, D.; Ye, C.; Billinton, R.; Lakhanpal, D.

    1993-01-01

    A study was conducted on the selection of a generating system reliability criterion that ensures a reasonable continuity of supply while minimizing the total costs to utility customers. The study was conducted using the Institute for Electronic and Electrical Engineers (IEEE) reliability test system as the study system. The study inputs and results for conditions and load forecast data, new supply resources data, demand-side management resource data, resource planning criterion, criterion value selection, supply side development, integrated resource development, and best criterion values, are tabulated and discussed. Preliminary conclusions are drawn as follows. In the case of integrated resource planning, the selection of the best value for a given type of reliability criterion can be done using methods similar to those used for supply side planning. The reliability criteria values previously used for supply side planning may not be economically justified when integrated resource planning is used. Utilities may have to revise and adopt new, and perhaps lower supply reliability criteria for integrated resource planning. More complex reliability criteria, such as energy related indices, which take into account the magnitude, frequency and duration of the expected interruptions are better adapted than the simpler capacity-based reliability criteria such as loss of load expectation. 7 refs., 5 figs., 10 tabs

  6. Equipment reliability improvement process; implementation in Almaraz NPP and Trillo NPP

    International Nuclear Information System (INIS)

    Risquez Bailon, Aranzazu; Gutierrez Fernandez, Eduardo

    2010-01-01

    The Equipment Reliability Improvement Process (INPO AP-913) is a non-regulatory process developed by the US Nuclear Industry for improving Plants Availability. This Process integrates and coordinates a broad range of equipment reliability activities into one process, performed by the Plant in a non-centralized way. The integration and coordination of these activities will allow plant personnel to evaluate the trends of important station equipment, develop and implement long-term equipment health plans, monitor equipment performance and condition, and make adjustments to preventive maintenance tasks and frequencies based on equipment operating experience, if necessary, arbitrating operational and design improvements, to reach a Failure-free Operation. This paper describes the methodology of Equipment Reliability Improvement Process, being focused on main aspects of the implementation process, relating to the scope and establishment of an Equipment Reliability Monitoring Plan, which should include and complement the existing mechanisms and organizations in the Plant to monitor the condition and performance of the equipments, with the common aim of achieving an operation free of failures. The paper will describe the tools that Iberdrola Ingenieria has developed to support the implementation and monitoring of the Equipment Reliability Improvement Process, as well as the results and lessons learned from its implementation in Almaraz NPP and Trillo NPP. (authors)

  7. 75 FR 14386 - Interpretation of Transmission Planning Reliability Standard

    Science.gov (United States)

    2010-03-25

    ...] Interpretation of Transmission Planning Reliability Standard March 18, 2010. AGENCY: Federal Energy Regulatory... transmission planning Reliability Standard TPL-002-0 provides that planning authorities and transmission... Reliability Standard TPL-002-0. In this order, the Commission proposes to reject NERC's proposed...

  8. Flexibility and reliability in long-term planning exercises dedicated to the electricity sector

    Energy Technology Data Exchange (ETDEWEB)

    Maizi, Nadia; Drouineau, Mathilde; Assoumou, Edi; Mazauric, Vincent

    2010-09-15

    Long-term planning models are useful to build plausible options for future energy systems and must consequently address the technological feasibility and associated cost of these options. This paper focuses on the electricity sector and on problems of flexibility and reliability in power systems in order to improve results provided by long-term planning exercises: flexibility needs are integrated as an additional criterion for new investment decisions and, reliability requirements are assessed through the level of electrical losses they induced and a related cost. These approaches are implemented in a long-term planning model and demonstrated through a study of the Reunion Island.

  9. Reliability-Based Design and Planning of Inspection and Monitoring of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Marquez-Dominguez, Sergio

    Maintaining and developing a sustainable wind industry is the main motivation of this PhD thesis entitled “Reliability-based design and planning of inspection and monitoring of offshore wind turbines”. In this thesis, statistical methods and probability theory are important mathematical tools used...... and offshore wind turbine foundations with the aim of improving the design, decreasing structural costs and increasing benefits. Recently, wind energy technology has started to adopt risk and reliability based inspection planning (RBI) as a methodology based on Bayesian decision theories together...

  10. Developing a system engineering program to improve performance and reliability

    International Nuclear Information System (INIS)

    Keuter, D.

    1985-01-01

    After several maintenance, operational, and equipment problems last year, Trojan set out on a mission to improve plant performance and reliability by strengthening its on-site engineering organization. This paper presents Trojan's plans in developing an on-site system engineering organization

  11. 77 FR 26714 - Transmission Planning Reliability Standards

    Science.gov (United States)

    2012-05-07

    ... Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g... Standards for the Bulk Power System, 130 FERC ] 61,200 (2010) (March 2010 Order). \\12\\ Mandatory Reliability... excluded from future planning assessments and its potential impact to bulk electric system reliability...

  12. Nuclear Station Facilities Improvement Planning

    International Nuclear Information System (INIS)

    Hooks, R. W.; Lunardini, A. L.; Zaben, O.

    1991-01-01

    An effective facilities improvement program will include a plan for the temporary relocation of personnel during the construction of an adjoining service building addition. Since the smooth continuation of plant operation is of paramount importance, the phasing plan is established to minimize the disruptions in day-to-day station operation and administration. This plan should consider the final occupancy arrangements and the transition to the new structure; for example, computer hookup and phase-in should be considered. The nuclear industry is placing more emphasis on safety and reliability of nuclear power plants. In order to do this, more emphasis is placed on operations and maintenance. This results in increased size of managerial, technical and maintenance staffs. This in turn requires improved office and service facilities. The facilities that require improvement may include training areas, rad waste processing and storage facilities, and maintenance facilities. This paper discusses an approach for developing an effective program to plan and implement these projects. These improvement projects can range in magnitude from modifying a simple system to building a new structure to allocating space for a future project. This paper addresses the planning required for the new structures with emphasis on site location, space allocation, and internal layout. Since facility planning has recently been completed by Sargent and Leyden at six U. S. nuclear stations, specific examples from some of those plants are presented. Site planning and the establishment of long-range goals are of the utmost importance when undertaking a facilities improvement program for a nuclear station. A plan that considers the total site usage will enhance the value of both the new and existing facilities. Proper planning at the beginning of the program can minimize costs and maximize the benefits of the program

  13. The reliability improvement plan of hot cell examination data by introducing of Kolas

    International Nuclear Information System (INIS)

    Hong, Kwon Pyo; Park, Dae Gyu; Ahn, Sang Bok; Choo, Yong Sun; Song, Wung Sup; Jung, Yang Hong; Yoo, Byung Ok; Baik, Seung Je; Lim, Nam Jin; Nam Ju Hee

    2000-01-01

    For enhancement of hot cell data reliability produced at Irradiated Material Examination Facility in KAERI,Korea a project to introduce Kolas of National Quality Assurance Institute. By Kolas introduction the examination data currently produced would be reinforced by additional function of uncertainty evaluation and would obtained more reliable data. The all of data collected would be quality controlled, so that it would be re-traceable. Presently at IMEF shock test, tension test, dimension measurement test, hardness test, density test, and composition analysis test will be subject to Kolas. It is also planned to expand the number of test items in near future. At the end of 2000 year IMEF aims to secure the certificate issued by the National Quality Assurance Institute. (Hong, J. S.)

  14. Maps and plans reliability in tourism activities

    Directory of Open Access Journals (Sweden)

    Олександр Донцов

    2016-10-01

    Full Text Available The paper is devoted to creation of an effective system of mapping at all levels of tourist-excursion functioning that will boost the promotion of tourist product in a domestic and foreign tourist market. The State Scientific - Production Enterprise «Kartographia» actively participates in cartographic tourism provision by producing travel pieces, survey, large-scale, route maps, atlases, travel guides, city plans. They produce maps covering different content of the territory of Ukraine, its individual regions, cities interested in tourist excursions. The list and scope of cartographic products has been prepared for publication and released for the last five years. The development of new types of tourism encourages publishers to create various cartographic products for the needs of tourists guaranteeing high accuracy, reliability of information, ease of use. A variety of scientific and practical problems in tourism and excursion activities that are solved using maps and plans makes it difficult to determine the criteria for assessing their reliability. The author proposes to introduce the concept of «relevance» - as maps suitability to solving specific problems. The basis of the peer review is suitability of maps for the objective results release criteria: appropriateness of the target maps tasks (area, theme, destination; accuracy of given parameters (projection, scale, height interval; year according to the shooting of location or mapping; selection methods, methods of results measurement processing algorithm; availability of assistive devices (instrumentation, computer technology, simulation devices. These criteria provide the reliability and accuracy of the result as acceptable to consumers as possible. The author proposes a set of measures aimed at improving the content, quality and reliability of cartographic production.

  15. Reliability planning in distributed electric energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.

    1978-10-01

    The goal of this paper is to develop tools for technology evaluation that address questions involving the economics of large-scale systems. The kind of cost discussed usually involves some dynamic aspect of the energy system. In particular, such properties as flexibility, stability, and resilience are features of entire systems. Special attention must be paid to the question of reliability, i.e., availability on demand. The storage problem and the planning for reliability in utility systems are the subjects of this paper. The introductory chapter addresses preliminary definitions--reliability planning, uncertainty, resilience, and other sensitivities. The study focuses on the contrast between conventional power generation technologies with controllable output and intermittent resources such as wind and solar electric conversion devices. The system studied is a stylized representation of California conditions. Significant differences were found in reliability planning requirements (and therefore costs) for systems dominated by central station plants as opposed to those dominated by intermittent resource technologies. It is argued that existing hydroelectric facilities need re-optimization. These plants provide the only currently existing bulk power storage in electric energy systems. 38 references. (MCW)

  16. Improving machinery reliability

    CERN Document Server

    Bloch, Heinz P

    1998-01-01

    This totally revised, updated and expanded edition provides proven techniques and procedures that extend machinery life, reduce maintenance costs, and achieve optimum machinery reliability. This essential text clearly describes the reliability improvement and failure avoidance steps practiced by best-of-class process plants in the U.S. and Europe.

  17. Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Keller, Jonathan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wallen, Robb [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-10-01

    This document describes the Phase 3 test plan for the Gearbox Reliability Collaborative Gearbox #3. The primary test objective is to measure the planetary load sharing characteristics in the same conditions as the original gearbox design. If the measured load-sharing characteristics are close to the design model, the projected three-times improvement in planetary section predicted fatigue life and the efficacy of preloaded tapered roller bearings in mitigating the planetary bearing fatigue failure mode will have been demonstrated.

  18. Reliability demonstration test planning: A three dimensional consideration

    International Nuclear Information System (INIS)

    Yadav, Om Prakash; Singh, Nanua; Goel, Parveen S.

    2006-01-01

    Increasing customer demand for reliability, fierce market competition on time-to-market and cost, and highly reliable products are making reliability testing more challenging task. This paper presents a systematic approach for identifying critical elements (subsystems and components) of the system and deciding the types of test to be performed to demonstrate reliability. It decomposes the system into three dimensions (i.e. physical, functional and time) and identifies critical elements in the design by allocating system level reliability to each candidate. The decomposition of system level reliability is achieved by using criticality index. The numerical value of criticality index for each candidate is derived based on the information available from failure mode and effects analysis (FMEA) document or warranty data from a prior system. It makes use of this information to develop reliability demonstration test plan for the identified (critical) failure mechanisms and physical elements. It also highlights the benefits of using prior information in order to locate critical spots in the design and in subsequent development of test plans. A case example is presented to demonstrate the proposed approach

  19. Selenide isotope generator for the Galileo mission. Reliability program plan

    International Nuclear Information System (INIS)

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineated herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work

  20. Improvement of plant reliability in PT. Badak LNG plant

    International Nuclear Information System (INIS)

    Achmad, S.; Somantri, A.

    1997-01-01

    PT. Badak's LNG sales commitment has been steadily increasing, therefore, there has been more emphasis to improve and maintain the LNG plant reliability. From plant operation historical records, Badak LNG plant experienced a high number of LNG process train trips and down time for 1977 through 1988. The highest annual number of LNG plant trips (50 times) occurred in 1983 and the longest LNG process train down time (1259 train-hours) occurred in 1988. Since 1989, PT. Badak has been able to reduce the number of LNG process train trips and down time significantly. In 1994 the number of LNG process train trips and was 18 times and the longest LNG process train down time was 377 train-hours. This plant reliability improvement was achieved by implementing plant reliability improvement programs beginning with the design of the new facilities and continuing with the maintenance and modification of the existing facilities. To improve reliability of the existing facilities, PT. Badak has been implementing comprehensive maintenance programs, to reduce the frequency and down time of the plant, such as Preventive and Predictive Maintenance as well as procurement material improvement since PT. Badak location is in a remote area. By implementing the comprehensive reliability maintenance, PT. Badak has been able to reduce the LNG process train trips to 18 and down time to 337 train hours in 1994 with the subsequent maintenance cost reduction. The average PT. Badak plant availability from 1985 to 1995 is 94.59%. New facilities were designed according to the established PT. Badak design philosophy, master plan and specification. Design of new facilities was modified to avoid certain problems from past experience. (au)

  1. Planning is not sufficient - Reliable computers need good requirements specifications

    International Nuclear Information System (INIS)

    Matras, J.R.

    1992-01-01

    Computer system reliability is the assurance that a computer system will perform its functions when required to do so. To ensure such reliability, it is important to plan the activities needed for computer system development. These development activities, in turn, require a Computer Quality Assurance Plan (CQAP) that provides the following: a Configuration Management Plan, a Verification and Validation (V and V) Plan, documentation requirements, a defined life cycle, review requirements, and organizational responsibilities. These items are necessary for system reliability; ultimately, however, they are not enough. Development of a reliable system is dependent on the requirements specification. This paper discusses how to use existing industry standards to develop a CQAP. In particular, the paper emphasizes the importance of the requirements specification and of methods for establishing reliability goals. The paper also describes how the revision of ANSI/IEE-ANS-7-4.3.2, Application Criteria for Digital Computer Systems of Nuclear Power Generating Stations, has addressed these issues

  2. Maintenance optimization plan for essential equipment reliability

    International Nuclear Information System (INIS)

    Steffen, D.H.

    1996-02-01

    The Maintenance Optimization Plan (MOP) for Essential Equipment Reliability will furnish Tank Waste Remediation System (TWRS) management with a pro-active, forward-thinking process for maintaining essential structures, systems, and components (ESSC) at the Hanford Site tank farms in their designed condition, and to ensure optimum ESSC availability and reliability

  3. Evaluation and improvement in nondestructive examination (NDE) reliability for inservice inspection of light water reactors

    International Nuclear Information System (INIS)

    Doctor, S.R.; Andersen, E.S.; Bowey, R.E.; Diaz, A.A.; Good, M.S.; Heasler, P.G.; Hockey, R.L.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T.; Vo, T.V.

    1991-01-01

    This program is intended to establish the effectiveness, reliability and adequacy of inservice inspection of reactor pressure vessels and primary piping systems and the impact of ISI reliability on system integrity. The objectives of the program include: (a) determine the effectiveness and reliability of ultrasonic inservice inspection (ISI) performed on commercial, light water reactor pressure vessels and piping; (b) recommend Code changes to the inspection procedures to improve the reliability of ISI; (c) using fracture mechanics analysis, determine the impact of NDE unreliability on system safety and determine the level of inspection reliability required to assure a suitably low failure probability; (d) evaluate the degree of reliability improvement which could be achieved using improved NDE techniques; and (e) based on importance of component to safety, material properties, service conditions, and NDE uncertainties, formulate improved inservice inspection criteria (including sampling plan, frequency, and reliability of inspection) for revisions to ASME Section XI and regulatory requirements needed to assure suitably low failure probabilities

  4. ANALYSIS OF POWER SYSTEM RELIABILITY IMPROVEMENT FOR 74-BUS RADIAL DISTRIBUTION SYSTEM

    OpenAIRE

    Su Mon Myint*

    2018-01-01

    In Myanmar, electric power system planning is widely constructed because of more and more load growth and facing with failure of electricity, outage problems and system shut-down. Thus, not only making new power system network but also improving reliability of the existing system using suitable methods is very important to provide an adequate supply of electrical energy to its customers as economically and reliably as possible with an acceptable degree of continuity and quality that is design...

  5. Steam generator reliability improvement project

    International Nuclear Information System (INIS)

    Blomgren, J.C.; Green, S.J.

    1987-01-01

    Upon successful completion of its research and development technology transfer program, the Electric Power Research Institute's Steam Generator Owners Group (SGOG II) will disband in December 1986 and be replaced in January 1987 by a successor project, the Steam Generator Reliability Project (SGRP). The new project, funded in the EPRI base program, will continue the emphasis on reliability and life extension that was carried forward by SGOG II. The objectives of SGOG II have been met. Causes and remedies have been identified for tubing corrosion problems, such as stress corrosion cracking and pitting, and steam generator technology has been improved in areas such as tube wear prediction and nondestructive evaluation (NDE). These actions have led to improved reliability of steam generators. Now the owners want to continue with a centrally managed program that builds on what has been learned. The goal is to continue to improve steam generator reliability and solve small problems before they become large problems

  6. Steam generator reliability improvement project

    International Nuclear Information System (INIS)

    Blomgren, J.C.; Green, S.J.

    1987-01-01

    Upon successful completion of its research and development technology transfer program, the Electric Power Research Institute's (EPRI's) Steam Generator Owners Group (SGOG II) will disband in December 1986, and be replaced in January 1987, by a successor project, the Steam Generator Reliability Project (SGRP). The new project, funded in the EPRI base program, will continue to emphasize reliability and life extension, which were carried forward by SGOG II. The objectives of SGOG II have been met. Causes and remedies have been identified for tubing corrosion problems such as stress corrosion cracking and pitting, and steam generator technology has been improved in areas such as tube wear prediction and nondestructive evaluation. These actions have led to improved reliability of steam generators. Now the owners want to continue with a centrally managed program that builds on what has been learned. The goal is to continue to improve steam generator reliability and to solve small problems before they become large problems

  7. Improving reliability in south Ajax with IntelliTEAM

    Energy Technology Data Exchange (ETDEWEB)

    Starck, A.P. [Veridian Connections Inc., Ajax, ON (Canada)

    2010-07-01

    Veridian Connections Incorporated is a local electricity distribution company in Ontario that is faced with end of life feeder cables and an aging system. Most of the feeders are combined overhead and underground cables supplied from several substations with a limited transfer capability. The commercial activity in the utility's service area is intolerant to sustained outages. Although the initial plan was to replace the cables, capital and time constraints led the utility to chose the IntelliTEAM 2 system to improve reliability, by reducing the frequency, duration and impact of outages. The unique system is based on submersible switchgear, PulseClosing and includes the substation breakers as IntelliTEAM devices. The current plan to implement a smart grid turns sustained outages into momentary outages; reduces the number of customers affected by a sustained failure; improves the ability to transfer loads; and reduces stresses on aged cables. The self healing system restores customers in less than a minute and provides visibility to SCADA operators through a high speed SpeedNet radio system. tabs., figs.

  8. 78 FR 30804 - Transmission Planning Reliability Standards

    Science.gov (United States)

    2013-05-23

    ... shedding firm load versus planning to shed firm load, while still ensuring that the decision-making process... load loss. NERC states that it developed this information to ensure that an entity adequately... adverse reliability impacts. While consumers and local communities should be able to make decisions about...

  9. An analysis of operational experience during low power and shutdown and a plan for addressing human reliability assessment issues

    International Nuclear Information System (INIS)

    Barriere, M.; Luckas, W.; Whitehead, D.; Ramey-Smith, A.

    1994-06-01

    Recent nuclear power plant events (e.g. Chernobyl, Diablo Canyon, and Vogtle) and US Nuclear Regulatory Commission (NRC) reports (e.g. NUREG-1449) have led to concerns regarding human reliability during low power and shutdown (LP ampersand S) conditions and limitations of human reliability analysis (HRA) methodologies in adequately representing the LP ampersand S environment. As a result of these concerns, the NRC initiated two parallel research projects to assess the influence of LP ampersand S conditions on human reliability through an analysis of operational experience at pressurized water reactors (PWRs) an boiling water reactors (BWRs). These research projects, performed by Brookhaven National Laboratory for PWRS, and Sandia National Laboratories for BWRs, identified unique aspects of human performance during LP ampersand S conditions and provided a program plan for research and development necessary to improve existing HRA methodologies. This report documents the results of the analysis of LP ampersand S operating experience and describes the improved HRA program plan

  10. Improving Reliability of a Residency Interview Process

    Science.gov (United States)

    Serres, Michelle L.; Gundrum, Todd E.

    2013-01-01

    Objective. To improve the reliability and discrimination of a pharmacy resident interview evaluation form, and thereby improve the reliability of the interview process. Methods. In phase 1 of the study, authors used a Many-Facet Rasch Measurement model to optimize an existing evaluation form for reliability and discrimination. In phase 2, interviewer pairs used the modified evaluation form within 4 separate interview stations. In phase 3, 8 interviewers individually-evaluated each candidate in one-on-one interviews. Results. In phase 1, the evaluation form had a reliability of 0.98 with person separation of 6.56; reproducibly, the form separated applicants into 6 distinct groups. Using that form in phase 2 and 3, our largest variation source was candidates, while content specificity was the next largest variation source. The phase 2 g-coefficient was 0.787, while confirmatory phase 3 was 0.922. Process reliability improved with more stations despite fewer interviewers per station—impact of content specificity was greatly reduced with more interview stations. Conclusion. A more reliable, discriminating evaluation form was developed to evaluate candidates during resident interviews, and a process was designed that reduced the impact from content specificity. PMID:24159209

  11. Improving reliability of a residency interview process.

    Science.gov (United States)

    Peeters, Michael J; Serres, Michelle L; Gundrum, Todd E

    2013-10-14

    To improve the reliability and discrimination of a pharmacy resident interview evaluation form, and thereby improve the reliability of the interview process. In phase 1 of the study, authors used a Many-Facet Rasch Measurement model to optimize an existing evaluation form for reliability and discrimination. In phase 2, interviewer pairs used the modified evaluation form within 4 separate interview stations. In phase 3, 8 interviewers individually-evaluated each candidate in one-on-one interviews. In phase 1, the evaluation form had a reliability of 0.98 with person separation of 6.56; reproducibly, the form separated applicants into 6 distinct groups. Using that form in phase 2 and 3, our largest variation source was candidates, while content specificity was the next largest variation source. The phase 2 g-coefficient was 0.787, while confirmatory phase 3 was 0.922. Process reliability improved with more stations despite fewer interviewers per station-impact of content specificity was greatly reduced with more interview stations. A more reliable, discriminating evaluation form was developed to evaluate candidates during resident interviews, and a process was designed that reduced the impact from content specificity.

  12. A Simulation Model for Machine Efficiency Improvement Using Reliability Centered Maintenance: Case Study of Semiconductor Factory

    Directory of Open Access Journals (Sweden)

    Srisawat Supsomboon

    2014-01-01

    Full Text Available The purpose of this study was to increase the quality of product by focusing on the machine efficiency improvement. The principle of the reliability centered maintenance (RCM was applied to increase the machine reliability. The objective was to create preventive maintenance plan under reliability centered maintenance method and to reduce defects. The study target was set to reduce the Lead PPM for a test machine by simulating the proposed preventive maintenance plan. The simulation optimization approach based on evolutionary algorithms was employed for the preventive maintenance technique selection process to select the PM interval that gave the best total cost and Lead PPM values. The research methodology includes procedures such as following the priority of critical components in test machine, analyzing the damage and risk level by using Failure Mode and Effects Analysis (FMEA, calculating the suitable replacement period through reliability estimation, and optimizing the preventive maintenance plan. From the result of the study it is shown that the Lead PPM of test machine can be reduced. The cost of preventive maintenance, cost of good product, and cost of lost product were decreased.

  13. APPLICATION OF TRAVEL TIME RELIABILITY FOR PERFORMANCE ORIENTED OPERATIONAL PLANNING OF EXPRESSWAYS

    Science.gov (United States)

    Mehran, Babak; Nakamura, Hideki

    Evaluation of impacts of congestion improvement scheme s on travel time reliability is very significant for road authorities since travel time reliability repr esents operational performance of expressway segments. In this paper, a methodology is presented to estimate travel tim e reliability prior to implementation of congestion relief schemes based on travel time variation modeling as a function of demand, capacity, weather conditions and road accident s. For subject expressway segmen ts, traffic conditions are modeled over a whole year considering demand and capacity as random variables. Patterns of demand and capacity are generated for each five minute interval by appl ying Monte-Carlo simulation technique, and accidents are randomly generated based on a model that links acci dent rate to traffic conditions. A whole year analysis is performed by comparing de mand and available capacity for each scenario and queue length is estimated through shockwave analysis for each time in terval. Travel times are estimated from refined speed-flow relationships developed for intercity expressways and buffer time index is estimated consequently as a measure of travel time reliability. For validation, estimated reliability indices are compared with measured values from empirical data, and it is shown that the proposed method is suitable for operational evaluation and planning purposes.

  14. 77 FR 53884 - Automatic Underfrequency Load Shedding and Load Shedding Plans Reliability Standards; Notice of...

    Science.gov (United States)

    2012-09-04

    ... Underfrequency Load Shedding and Load Shedding Plans Reliability Standards; Notice of Compliance Filing Take notice that on August 9, 2012, North American Electric Reliability Corporation submitted a compliance... Load Shedding Plans Reliability Standards, 139 FERC ] 61,098, (Order No. 763) (2012). Any person...

  15. Improved radiograph measurement inter-observer reliability by use of statistical shape models

    Energy Technology Data Exchange (ETDEWEB)

    Pegg, E.C., E-mail: elise.pegg@ndorms.ox.ac.uk [University of Oxford, Nuffield Department of Orthopaedics, Rheumatology and Musculoskeletal Sciences, Nuffield Orthopaedic Centre, Windmill Road, Oxford OX3 7LD (United Kingdom); Mellon, S.J., E-mail: stephen.mellon@ndorms.ox.ac.uk [University of Oxford, Nuffield Department of Orthopaedics, Rheumatology and Musculoskeletal Sciences, Nuffield Orthopaedic Centre, Windmill Road, Oxford OX3 7LD (United Kingdom); Salmon, G. [University of Oxford, Nuffield Department of Orthopaedics, Rheumatology and Musculoskeletal Sciences, Nuffield Orthopaedic Centre, Windmill Road, Oxford OX3 7LD (United Kingdom); Alvand, A., E-mail: abtin.alvand@ndorms.ox.ac.uk [University of Oxford, Nuffield Department of Orthopaedics, Rheumatology and Musculoskeletal Sciences, Nuffield Orthopaedic Centre, Windmill Road, Oxford OX3 7LD (United Kingdom); Pandit, H., E-mail: hemant.pandit@ndorms.ox.ac.uk [University of Oxford, Nuffield Department of Orthopaedics, Rheumatology and Musculoskeletal Sciences, Nuffield Orthopaedic Centre, Windmill Road, Oxford OX3 7LD (United Kingdom); Murray, D.W., E-mail: david.murray@ndorms.ox.ac.uk [University of Oxford, Nuffield Department of Orthopaedics, Rheumatology and Musculoskeletal Sciences, Nuffield Orthopaedic Centre, Windmill Road, Oxford OX3 7LD (United Kingdom); Gill, H.S., E-mail: richie.gill@ndorms.ox.ac.uk [University of Oxford, Nuffield Department of Orthopaedics, Rheumatology and Musculoskeletal Sciences, Nuffield Orthopaedic Centre, Windmill Road, Oxford OX3 7LD (United Kingdom)

    2012-10-15

    Pre- and post-operative radiographs of patients undergoing joint arthroplasty are often examined for a variety of purposes including preoperative planning and patient assessment. This work examines the feasibility of using active shape models (ASM) to semi-automate measurements from post-operative radiographs for the specific case of the Oxford™ Unicompartmental Knee. Measurements of the proximal tibia and the position of the tibial tray were made using the ASM model and manually. Data were obtained by four observers and one observer took four sets of measurements to allow assessment of the inter- and intra-observer reliability, respectively. The parameters measured were the tibial tray angle, the tray overhang, the tray size, the sagittal cut position, the resection level and the tibial width. Results demonstrated improved reliability (average of 27% and 11.2% increase for intra- and inter-reliability, respectively) and equivalent accuracy (p > 0.05 for compared data values) for all of the measurements using the ASM model, with the exception of the tray overhang (p = 0.0001). Less time (15 s) was required to take measurements using the ASM model compared with manual measurements, which was significant. These encouraging results indicate that semi-automated measurement techniques could improve the reliability of radiographic measurements.

  16. Improved radiograph measurement inter-observer reliability by use of statistical shape models

    International Nuclear Information System (INIS)

    Pegg, E.C.; Mellon, S.J.; Salmon, G.; Alvand, A.; Pandit, H.; Murray, D.W.; Gill, H.S.

    2012-01-01

    Pre- and post-operative radiographs of patients undergoing joint arthroplasty are often examined for a variety of purposes including preoperative planning and patient assessment. This work examines the feasibility of using active shape models (ASM) to semi-automate measurements from post-operative radiographs for the specific case of the Oxford™ Unicompartmental Knee. Measurements of the proximal tibia and the position of the tibial tray were made using the ASM model and manually. Data were obtained by four observers and one observer took four sets of measurements to allow assessment of the inter- and intra-observer reliability, respectively. The parameters measured were the tibial tray angle, the tray overhang, the tray size, the sagittal cut position, the resection level and the tibial width. Results demonstrated improved reliability (average of 27% and 11.2% increase for intra- and inter-reliability, respectively) and equivalent accuracy (p > 0.05 for compared data values) for all of the measurements using the ASM model, with the exception of the tray overhang (p = 0.0001). Less time (15 s) was required to take measurements using the ASM model compared with manual measurements, which was significant. These encouraging results indicate that semi-automated measurement techniques could improve the reliability of radiographic measurements

  17. Reliability program plan for the Kilowatt Isotope Power System (KIPS) technology verification phase

    International Nuclear Information System (INIS)

    1978-01-01

    Ths document is an integral part of the Kilowatt Isotope Power System (KIPS) Program Plan. This document defines the KIPS Reliability Program Plan for the Technology Verification Phase. This document delineates the reliability assurance tasks that are to be accomplished by Sundstrand and its suppliers during the design, fabrication and testing of the KIPS

  18. Projecting technology change to improve space technology planning and systems management

    Science.gov (United States)

    Walk, Steven Robert

    2011-04-01

    Projecting technology performance evolution has been improving over the years. Reliable quantitative forecasting methods have been developed that project the growth, diffusion, and performance of technology in time, including projecting technology substitutions, saturation levels, and performance improvements. These forecasts can be applied at the early stages of space technology planning to better predict available future technology performance, assure the successful selection of technology, and improve technology systems management strategy. Often what is published as a technology forecast is simply scenario planning, usually made by extrapolating current trends into the future, with perhaps some subjective insight added. Typically, the accuracy of such predictions falls rapidly with distance in time. Quantitative technology forecasting (QTF), on the other hand, includes the study of historic data to identify one of or a combination of several recognized universal technology diffusion or substitution patterns. In the same manner that quantitative models of physical phenomena provide excellent predictions of system behavior, so do QTF models provide reliable technological performance trajectories. In practice, a quantitative technology forecast is completed to ascertain with confidence when the projected performance of a technology or system of technologies will occur. Such projections provide reliable time-referenced information when considering cost and performance trade-offs in maintaining, replacing, or migrating a technology, component, or system. This paper introduces various quantitative technology forecasting techniques and illustrates their practical application in space technology and technology systems management.

  19. Heroic Reliability Improvement in Manned Space Systems

    Science.gov (United States)

    Jones, Harry W.

    2017-01-01

    System reliability can be significantly improved by a strong continued effort to identify and remove all the causes of actual failures. Newly designed systems often have unexpected high failure rates which can be reduced by successive design improvements until the final operational system has an acceptable failure rate. There are many causes of failures and many ways to remove them. New systems may have poor specifications, design errors, or mistaken operations concepts. Correcting unexpected problems as they occur can produce large early gains in reliability. Improved technology in materials, components, and design approaches can increase reliability. The reliability growth is achieved by repeatedly operating the system until it fails, identifying the failure cause, and fixing the problem. The failure rate reduction that can be obtained depends on the number and the failure rates of the correctable failures. Under the strong assumption that the failure causes can be removed, the decline in overall failure rate can be predicted. If a failure occurs at the rate of lambda per unit time, the expected time before the failure occurs and can be corrected is 1/lambda, the Mean Time Before Failure (MTBF). Finding and fixing a less frequent failure with the rate of lambda/2 per unit time requires twice as long, time of 1/(2 lambda). Cutting the failure rate in half requires doubling the test and redesign time and finding and eliminating the failure causes.Reducing the failure rate significantly requires a heroic reliability improvement effort.

  20. Puget Sound area electric reliability plan. Draft environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  1. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  2. Continual improvement plan

    Science.gov (United States)

    1994-01-01

    NASA's approach to continual improvement (CI) is a systems-oriented, agency-wide approach that builds on the past accomplishments of NASA Headquarters and its field installations and helps achieve NASA's vision, mission, and values. The NASA of the future will fully use the principles of continual improvement in every aspect of its operations. This NASA CI plan defines a systematic approach and a model for continual improvement throughout NASA, stressing systems integration and optimization. It demonstrates NASA's constancy of purpose for improvement - a consistent vision of NASA as a worldwide leader in top-quality science, technology, and management practices. The CI plan provides the rationale, structures, methods, and steps, and it defines NASA's short term (1-year) objectives for improvement. The CI plan presents the deployment strategies necessary for cascading the goals and objectives throughout the agency. It also provides guidance on implementing continual improvement with participation from top leadership and all levels of employees.

  3. Reliability-based inspection planning of 20MW offshore wind turbine jacket

    DEFF Research Database (Denmark)

    Gintautas, Tomas; Sørensen, John Dalsgaard

    2018-01-01

    This paper presents the application of a risk and reliability based inspection planning framework (RBI) for the InnWind 20MW reference wind turbine jacket sub-structure. A detailed fracture mechanics based fatigue crack growth model is developed and used as basis to derive optimal inspection plans...

  4. Reliability demonstration test planning using bayesian analysis

    International Nuclear Information System (INIS)

    Chandran, Senthil Kumar; Arul, John A.

    2003-01-01

    In Nuclear Power Plants, the reliability of all the safety systems is very critical from the safety viewpoint and it is very essential that the required reliability requirements be met while satisfying the design constraints. From practical experience, it is found that the reliability of complex systems such as Safety Rod Drive Mechanism is of the order of 10 -4 with an uncertainty factor of 10. To demonstrate the reliability of such systems is prohibitive in terms of cost and time as the number of tests needed is very large. The purpose of this paper is to develop a Bayesian reliability demonstrating testing procedure for exponentially distributed failure times with gamma prior distribution on the failure rate which can be easily and effectively used to demonstrate component/subsystem/system reliability conformance to stated requirements. The important questions addressed in this paper are: With zero failures, how long one should perform the tests and how many components are required to conclude with a given degree of confidence, that the component under test, meets the reliability requirement. The procedure is explained with an example. This procedure can also be extended to demonstrate with more number of failures. The approach presented is applicable for deriving test plans for demonstrating component failure rates of nuclear power plants, as the failure data for similar components are becoming available in existing plants elsewhere. The advantages of this procedure are the criterion upon which the procedure is based is simple and pertinent, the fitting of the prior distribution is an integral part of the procedure and is based on the use of information regarding two percentiles of this distribution and finally, the procedure is straightforward and easy to apply in practice. (author)

  5. Improving the safety and reliability of Monju

    International Nuclear Information System (INIS)

    Itou, Kazumoto; Maeda, Hiroshi; Moriyama, Masatoshi

    1998-01-01

    Comprehensive safety review has been performed at Monju to determine why the Monju secondary sodium leakage accident occurred. We investigated how to improve the situation based on the results of the safety review. The safety review focused on five aspects of whether the facilities for dealing with the sodium leakage accident were adequate: the reliability of the detection method, the reliability of the method for preventing the spread of the sodium leakage accident, whether the documented operating procedures are adequate, whether the quality assurance system, program, and actions were properly performed and so on. As a result, we established for Monju a better method of dealing with sodium leakage accidents, rapid detection of sodium leakage, improvement of sodium drain facilities, and way to reduce damage to Monju systems after an accident. We also improve the operation procedures and quality assurance actions to increase the safety and reliability of Monju. (author)

  6. Plans for improvements to the ATF ECH system

    International Nuclear Information System (INIS)

    Bigelow, T.S.; Goldfinger, R.C.; Murakami, M.; Schaich, C.R.; Wilgen, J.B.

    1993-01-01

    The Advanced Toroidal Facility (ATF) stellarator experiment at Oak Ridge National Laboratory (ORNL) uses electron cyclotron waves for plasma formation and heating. Although the existing systems are quite reliable and produce acceptable plasmas, a few deficiencies should be corrected. Therefore, several possible upgrades to the electron cyclotron heating (ECH) systems have been planned. Some of the desirable changes are (1) improving the launcher to make power deposition in the plasma more centralized, (2) improving the gyrotron power waveform monitoring diagnostics, (3) building a high-field launch system for higher density operation at 53-GHz (4) building a separate transmission line for the 35-GHz gyrotron, and (5) installing a higher frequency, higher power (84- or 110-GHz) gyrotron system for improved plasma density and temperature capability. This paper discusses options for these improvements and conceptual designs. (orig.)

  7. Reliability-How to Quantify and Improve?

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 5; Issue 5. Reliability - How to Quantify and Improve? - Improving the Health of Products. N K Srinivasan. General Article Volume 5 Issue 5 May 2000 pp 55-63. Fulltext. Click here to view fulltext PDF. Permanent link:

  8. Reliability and risk analysis methods research plan

    International Nuclear Information System (INIS)

    1984-10-01

    This document presents a plan for reliability and risk analysis methods research to be performed mainly by the Reactor Risk Branch (RRB), Division of Risk Analysis and Operations (DRAO), Office of Nuclear Regulatory Research. It includes those activities of other DRAO branches which are very closely related to those of the RRB. Related or interfacing programs of other divisions, offices and organizations are merely indicated. The primary use of this document is envisioned as an NRC working document, covering about a 3-year period, to foster better coordination in reliability and risk analysis methods development between the offices of Nuclear Regulatory Research and Nuclear Reactor Regulation. It will also serve as an information source for contractors and others to more clearly understand the objectives, needs, programmatic activities and interfaces together with the overall logical structure of the program

  9. Improving Therapeutic Relationships: Joint Crisis Planning for Individuals With Psychotic Disorders.

    Science.gov (United States)

    Farrelly, Simone; Lester, Helen; Rose, Diana; Birchwood, Max; Marshall, Max; Waheed, Waquas; Henderson, R Claire; Szmukler, George; Thornicroft, Graham

    2015-12-01

    Outcomes for individuals with psychosis remain far from acceptable. Recently, prominent psychiatrists have called for an improved understanding of the impact of social contexts, and how social contexts might influence the development and maintenance of mental health problems. A key social context for individuals with psychosis is the therapeutic relationship. As part of a trial of joint crisis planning in England, this qualitative study aimed to determine the mechanism through which joint crisis planning might affect the therapeutic relationship. Results suggest that routine processes in mental health care are affected by policy and organizational requirements for risk mitigation-aspects that undermine person-centered approaches. In contrast, strong therapeutic relationships are characterized by individualized care and reliable and respectful treatment. The Joint Crisis Plan intervention partially succeeded in reducing contextual influences on routine role enactments, facilitating the demonstration of respect and improving the therapeutic relationship. © The Author(s) 2015.

  10. Cost benefit justification of nuclear plant reliability improvement

    International Nuclear Information System (INIS)

    El-Sayed, M.A.H.; Abdelmonem, N.M.

    1986-01-01

    Nuclear power costs are evaluated on the bases of general ground rules (a) vary from time to time (b) vary from country to another (c) even vary from one reactor type to another. The main objective of an electric utility is to provide the electric energy to the different consummers at the lowest possible cost with reasonable reliability level. Rapid increase of the construction costs and fuel prices in recent years have stimulated a great deal of interest in improving the reliability and productivity of new and existing power plants. One of the most important areas is the improvement of the secondary steam loop and the reactor cooling system. The method for evaluating the reliability of steam loop and cooling system utilizes the cut-set technique. The developed method can be easily used to show to what extent the overall reliability of the nuclear plant is affected by the possible failures in the steam and cooling subsystem. The cost reliability trade-off analysis is used to evaluate alternative schemes in the design with a view towards meeting a high reliability goal. Based on historical or estimated failure and repair rate, the reliability of the alternate scheme can be calculated

  11. Improving Power Converter Reliability

    DEFF Research Database (Denmark)

    Ghimire, Pramod; de Vega, Angel Ruiz; Beczkowski, Szymon

    2014-01-01

    of a high-power IGBT module during converter operation, which may play a vital role in improving the reliability of the power converters. The measured voltage is used to estimate the module average junction temperature of the high and low-voltage side of a half-bridge IGBT separately in every fundamental......The real-time junction temperature monitoring of a high-power insulated-gate bipolar transistor (IGBT) module is important to increase the overall reliability of power converters for industrial applications. This article proposes a new method to measure the on-state collector?emitter voltage...... is measured in a wind power converter at a low fundamental frequency. To illustrate more, the test method as well as the performance of the measurement circuit are also presented. This measurement is also useful to indicate failure mechanisms such as bond wire lift-off and solder layer degradation...

  12. Cost benefit justification of nuclear plant reliability improvement

    International Nuclear Information System (INIS)

    El-Sayed, M.A.H.; Abdelmonem, N.M.

    1985-01-01

    The design of the secondary steam loop of the nuclear power plant has a significant effect on the reliability of the plant. Moreover, the necessity to cool a reactor safely has increased the reliability demanded from the system. The rapidly rising construction costs and fuel prices in recent years have stimulated a great deal in optimizing the productivity of a nuclear power plant through reliability improvement of the secondary steamloop and the reactor cooling system. A method for evaluating the reliability of steam loop and cooling system of a nuclear power plant is presented. The method utilizes the cut-set technique. The developed method can be easily used to show to what extent the overall reliability of the nuclear plant is affected by the possible failures in the steam and cooling subsystem. A model for calculating the increase in the nuclear plant productivity resulting from a proposed improvement in the two subsystems reliability is discussed. The model takes into account the capital cost of spare parts for several components, replacement energy, operating and maintenance costs

  13. Generic Reliability-Based Inspection Planning for Fatigue Sensitive Details

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Straub, Daniel; Faber, Michael Havbro

    2005-01-01

    of fatigue sensitive details in fixed offshore steel jacket platforms and FPSO ship structures. Inspection and maintenance activities are planned such that code based requirements to the safety of personnel and environment for the considered structure are fulfilled and at the same time such that the overall......The generic approach for planning of in-service NDT inspections is extended to cover the case where the fatigue load is modified during the design lifetime of the structure. Generic reliability-based inspection planning has been developed as a practical approach to perform inspection planning...... expected costs for design, inspections, repairs and failures are minimized. The method is based on the assumption of “no-finds” of cracks during inspections. Each fatigue sensitive detail is categorized according to their type of details (SN curves), FDF values, RSR values, inspection, repair and failure...

  14. Teaming up to improve reliability

    International Nuclear Information System (INIS)

    Malone, E.A.; Ayres, D.J.; Lear, R.C. van

    1989-01-01

    Responding to increasingly stringent regulatory requirements, Babcock and Wilcox has teamed up with three specialist companies to provide services for nuclear utilities aiming to improve the performance of their valves and actuators. The services, which are outlined here, include inspection, repair, overhaul and valve and actuator reliability programmes. (author)

  15. Reliability improvement of multiversion software by exchanging modules

    International Nuclear Information System (INIS)

    Shima, Kazuyuki; Matsumoto, Ken-ichi; Torii, Koji

    1996-01-01

    In this paper, we proposes a method to improve reliability of multiversion software. In CER proposed in, checkpoints are put in versions of program and errors of versions are detected and recovered at the checkpoints. It prevent versions from failing and improve the reliability of multiversion software. But it is point out that CER decreases the reliability of the multiversion software if the detection and recovery of errors are assumed to be able to fail. In the method proposed in this paper, versions of program are developed following the same module specifications. When failures of versions of program are detected, faulty modules are identified and replaced them to other modules. It create versions without faulty modules and improve the reliability of multiversion software. The failure probability of multiversion software is estimated to become about a hundredth of the failure probability by the proposed method where the failure probability of each version is 0.000698, the number of versions is 5 and the number of modules is 20. (author)

  16. A reliability-based approach of fastest routes planning in dynamic traffic network under emergency management situation

    Directory of Open Access Journals (Sweden)

    Ye Sun

    2011-12-01

    Full Text Available In order to establish an available emergency management system, it is important to conduct effective evacuation with reliable and real time optimal route plans. This paper aims at creating a route finding strategy by considering the time dependent factors as well as uncertainties that may be encountered during the emergency management system. To combine dynamic features with the level of reliability in the process of fastest route planning, the speed distribution of typical intercity roads is studied in depth, and the strategy of modifying real time speed to a more reliable value based on speed distribution is proposed. Two algorithms of route planning have been developed to find three optimal routes with the shortest travel time and the reliability of 0.9. In order to validate the new strategy, experimental implementation of the route planning method is conducted based on road speed information acquired by field study. The results show that the proposed strategy might provide more reliable routes in dynamic traffic networks by conservatively treating roads with large speed discretion or with relative extreme real speed value.

  17. Reliability-Based Inspection Planning for Structural Systems

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    1993-01-01

    A general model for reliability-based optimal inspection and repair strategies for structural systems is described. The total expected costs in the design lifetime is minimized with the number of inspections, the inspection times and efforts as decision variables. The equivalence of this model...... with a preposterior analysis from statistical decision theory is discussed. It is described how information obtained by an inspection can be used in a repair decision. Stochastic models for inspection, measurement and repair actions are presented. The general model is applied for inspection and repair planning...

  18. 23 CFR 1200.25 - Improvement plan.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Improvement plan. 1200.25 Section 1200.25 Highways... Implementation and Management of the Highway Safety Program § 1200.25 Improvement plan. If a review of the Annual... improvement plan. This plan will detail strategies, program activities, and funding targets to meet the...

  19. Reliability of an interactive computer program for advance care planning.

    Science.gov (United States)

    Schubart, Jane R; Levi, Benjamin H; Camacho, Fabian; Whitehead, Megan; Farace, Elana; Green, Michael J

    2012-06-01

    Despite widespread efforts to promote advance directives (ADs), completion rates remain low. Making Your Wishes Known: Planning Your Medical Future (MYWK) is an interactive computer program that guides individuals through the process of advance care planning, explaining health conditions and interventions that commonly involve life or death decisions, helps them articulate their values/goals, and translates users' preferences into a detailed AD document. The purpose of this study was to demonstrate that (in the absence of major life changes) the AD generated by MYWK reliably reflects an individual's values/preferences. English speakers ≥30 years old completed MYWK twice, 4 to 6 weeks apart. Reliability indices were assessed for three AD components: General Wishes; Specific Wishes for treatment; and Quality-of-Life values (QoL). Twenty-four participants completed the study. Both the Specific Wishes and QoL scales had high internal consistency in both time periods (Knuder Richardson formula 20 [KR-20]=0.83-0.95, and 0.86-0.89). Test-retest reliability was perfect for General Wishes (κ=1), high for QoL (Pearson's correlation coefficient=0.83), but lower for Specific Wishes (Pearson's correlation coefficient=0.57). MYWK generates an AD where General Wishes and QoL (but not Specific Wishes) statements remain consistent over time.

  20. Reliability of an Interactive Computer Program for Advance Care Planning

    Science.gov (United States)

    Levi, Benjamin H.; Camacho, Fabian; Whitehead, Megan; Farace, Elana; Green, Michael J

    2012-01-01

    Abstract Despite widespread efforts to promote advance directives (ADs), completion rates remain low. Making Your Wishes Known: Planning Your Medical Future (MYWK) is an interactive computer program that guides individuals through the process of advance care planning, explaining health conditions and interventions that commonly involve life or death decisions, helps them articulate their values/goals, and translates users' preferences into a detailed AD document. The purpose of this study was to demonstrate that (in the absence of major life changes) the AD generated by MYWK reliably reflects an individual's values/preferences. English speakers ≥30 years old completed MYWK twice, 4 to 6 weeks apart. Reliability indices were assessed for three AD components: General Wishes; Specific Wishes for treatment; and Quality-of-Life values (QoL). Twenty-four participants completed the study. Both the Specific Wishes and QoL scales had high internal consistency in both time periods (Knuder Richardson formula 20 [KR-20]=0.83–0.95, and 0.86–0.89). Test-retest reliability was perfect for General Wishes (κ=1), high for QoL (Pearson's correlation coefficient=0.83), but lower for Specific Wishes (Pearson's correlation coefficient=0.57). MYWK generates an AD where General Wishes and QoL (but not Specific Wishes) statements remain consistent over time. PMID:22512830

  1. Planning of operation & maintenance using risk and reliability based methods

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Operation and maintenance (OM) of offshore wind turbines contributes with a substantial part of the total levelized cost of energy (LCOE). The objective of this paper is to present an application of risk- and reliability-based methods for planning of OM. The theoretical basis is presented...

  2. Strategy for continuous improvement in IC manufacturability, yield, and reliability

    Science.gov (United States)

    Dreier, Dean J.; Berry, Mark; Schani, Phil; Phillips, Michael; Steinberg, Joe; DePinto, Gary

    1993-01-01

    Continual improvements in yield, reliability and manufacturability measure a fab and ultimately result in Total Customer Satisfaction. A new organizational and technical methodology for continuous defect reduction has been established in a formal feedback loop, which relies on yield and reliability, failed bit map analysis, analytical tools, inline monitoring, cross functional teams and a defect engineering group. The strategy requires the fastest detection, identification and implementation of possible corrective actions. Feedback cycle time is minimized at all points to improve yield and reliability and reduce costs, essential for competitiveness in the memory business. Payoff was a 9.4X reduction in defectivity and a 6.2X improvement in reliability of 256 K fast SRAMs over 20 months.

  3. 45 CFR 1355.35 - Program improvement plans.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Program improvement plans. 1355.35 Section 1355.35... plans. (a) Mandatory program improvement plan. (1) States found not to be operating in substantial conformity shall develop a program improvement plan. The program improvement plan must: (i) Be developed...

  4. Sample size planning for composite reliability coefficients: accuracy in parameter estimation via narrow confidence intervals.

    Science.gov (United States)

    Terry, Leann; Kelley, Ken

    2012-11-01

    Composite measures play an important role in psychology and related disciplines. Composite measures almost always have error. Correspondingly, it is important to understand the reliability of the scores from any particular composite measure. However, the point estimates of the reliability of composite measures are fallible and thus all such point estimates should be accompanied by a confidence interval. When confidence intervals are wide, there is much uncertainty in the population value of the reliability coefficient. Given the importance of reporting confidence intervals for estimates of reliability, coupled with the undesirability of wide confidence intervals, we develop methods that allow researchers to plan sample size in order to obtain narrow confidence intervals for population reliability coefficients. We first discuss composite reliability coefficients and then provide a discussion on confidence interval formation for the corresponding population value. Using the accuracy in parameter estimation approach, we develop two methods to obtain accurate estimates of reliability by planning sample size. The first method provides a way to plan sample size so that the expected confidence interval width for the population reliability coefficient is sufficiently narrow. The second method ensures that the confidence interval width will be sufficiently narrow with some desired degree of assurance (e.g., 99% assurance that the 95% confidence interval for the population reliability coefficient will be less than W units wide). The effectiveness of our methods was verified with Monte Carlo simulation studies. We demonstrate how to easily implement the methods with easy-to-use and freely available software. ©2011 The British Psychological Society.

  5. On Improving Reliability of SRAM-Based Physically Unclonable Functions

    Directory of Open Access Journals (Sweden)

    Arunkumar Vijayakumar

    2017-01-01

    Full Text Available Physically unclonable functions (PUFs have been touted for their inherent resistance to invasive attacks and low cost in providing a hardware root of trust for various security applications. SRAM PUFs in particular are popular in industry for key/ID generation. Due to intrinsic process variations, SRAM cells, ideally, tend to have the same start-up behavior. SRAM PUFs exploit this start-up behavior. Unfortunately, not all SRAM cells exhibit reliable start-up behavior due to noise susceptibility. Hence, design enhancements are needed for improving reliability. Some of the proposed enhancements in literature include fuzzy extraction, error-correcting codes and voting mechanisms. All enhancements involve a trade-off between area/power/performance overhead and PUF reliability. This paper presents a design enhancement technique for reliability that improves upon previous solutions. We present simulation results to quantify improvement in SRAM PUF reliability and efficiency. The proposed technique is shown to generate a 128-bit key in ≤0.2 μ s at an area estimate of 4538 μ m 2 with error rate as low as 10 − 6 for intrinsic error probability of 15%.

  6. New Methods for Building-In and Improvement of Integrated Circuit Reliability

    NARCIS (Netherlands)

    van der Pol, J.A.; van der Pol, Jacob Antonius

    2000-01-01

    Over the past 30 years the reliability of semiconductor products has improved by a factor of 100 while at the same time the complexity of the circuits has increased by a factor 105. This 7-decade reliability improvement has been realised by implementing a sophisticated reliability assurance system

  7. Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Link, H.; Keller, J.; Guo, Y.; McNiff, B.

    2013-04-01

    Gearboxes in wind turbines have not been achieving their expected design life even though they commonly meet or exceed the design criteria specified in current design standards. One of the basic premises of the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) is that the low gearbox reliability results from the absence of critical elements in the design process or insufficient design tools. Key goals of the GRC are to improve design approaches and analysis tools and to recommend practices and test methods resulting in improved design standards for wind turbine gearboxes that lower the cost of energy (COE) through improved reliability. The GRC uses a combined gearbox testing, modeling and analysis approach, along with a database of information from gearbox failures collected from overhauls and investigation of gearbox condition monitoring techniques to improve wind turbine operations and maintenance practices. Testing of Gearbox 2 (GB2) using the two-speed turbine controller that has been used in prior testing. This test series will investigate non-torque loads, high-speed shaft misalignment, and reproduction of field conditions in the dynamometer. This test series will also include vibration testing using an eddy-current brake on the gearbox's high speed shaft.

  8. Optimized work control process to improve safety and reliability in a risk-based and deregulated environment

    International Nuclear Information System (INIS)

    Anderson, Jon G.; Jeffries, Jeffrey D. E.; Mairs, Todd P.; Rahn, Frank J.

    1999-01-01

    This paper provides an overview of strategic models to assist power generating plants to improve their work control processes. These models include mechanisms to continually keep the process up to date. Included in the work control process are elements for system cost/performance analysis, life-cycle maintenance planning, on-line scheduling and look-ahead techniques, and schedule implementation to conduct work on the asset. The paper also discusses how risk management associated with work control issues that effect the safety and reliability, as well as O and M costs, is integrated into this strategy. The work control process is a pervasive and critical element in the successful implementation of operations and work management programs. While providing a method to implement maintenance activities in a cost-effective manner, the work control process improves plant safety and system reliability

  9. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  10. Investigation of DC-DC Boost Converter for Reliability of Operational Planning

    DEFF Research Database (Denmark)

    Khazraj, Hesam; Ashouri, Mani; Silva, Filipe Miguel Faria da

    2018-01-01

    of the interests related to reliability is the power semiconductor switches, which are the most vulnerable elements. The failure of one-power switches can reduce the system reliability. Interleaved technique for DC-DC converters is a redundant strategy to improve the reliability, but at the cost of increasing...

  11. 24 CFR 901.145 - Improvement Plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Improvement Plan. 901.145 Section... PUBLIC HOUSING MANAGEMENT ASSESSMENT PROGRAM § 901.145 Improvement Plan. (a) After receipt of the State... a PHA, or a RMC through the PHA, to prepare and submit to the State/Area Office an Improvement Plan...

  12. Some approaches to system reliability improvement in engineering design

    International Nuclear Information System (INIS)

    Shen, Kecheng.

    1990-01-01

    In this thesis some approaches to system reliability improvement in engineering design are studied. In particular, the thesis aims at developing alternative methodologies for ranking of component importance which are more related to the design practice and which are more useful in system synthesis than the existing ones. It also aims at developing component reliability models by means of stress-strength interference which will enable both component reliability prediction and design for reliability. A new methodology for ranking of component importance is first developed based on the notion of the increase of the expected system yield. This methodology allows for incorporation of different improvement actions at the component level such as parallel redundancy, standby redundancy, burn-in, minimal repair and perfect replacement. For each of these improvement actions, the increase of system reliability is studied and used as the component importance measure. A possible connection between the commonly known models of component lifetimes and the stress-strength interference models is suggested. Under some general conditions the relationship between component failure rate and the stress and strength distribution characteristics is studied. A heuristic approach for obtaining bounds on failure probability through stress-strength interference is also presented. A case study and a worked example are presented, which illustrate and verify the developed importance measures and their applications in the analytical as well as synthetical work of engineering design. (author)

  13. Assessment and Improving Methods of Reliability Indices in Bakhtar Regional Electricity Company

    Directory of Open Access Journals (Sweden)

    Saeed Shahrezaei

    2013-04-01

    Full Text Available Reliability of a system is the ability of a system to do prospected duties in future and the probability of desirable operation for doing predetermined duties. Power system elements failures data are the main data of reliability assessment in the network. Determining antiseptic parameters is the goal of reliability assessment by using system history data. These parameters help to recognize week points of the system. In other words, the goal of reliability assessment is operation improving and decreasing of the failures and power outages. This paper is developed to assess reliability indices of Bakhtar Regional Electricity Company up to 1393 and the improving methods and their effects on the reliability indices in this network. DIgSILENT Power Factory software is employed for simulation. Simulation results show the positive effect of improving methods in reliability indices of Bakhtar Regional Electricity Company.

  14. Strategic planning decision making using fuzzy SWOT-TOPSIS with reliability factor

    Science.gov (United States)

    Mohamad, Daud; Afandi, Nur Syamimi; Kamis, Nor Hanimah

    2015-10-01

    Strategic planning is a process of decision making and action for long-term activities in an organization. The Strengths, Weaknesses, Opportunities and Threats (SWOT) analysis has been commonly used to help organizations in strategizing their future direction by analyzing internal and external environment. However, SWOT analysis has some limitations as it is unable to prioritize appropriately the multiple alternative strategic decisions. Some efforts have been made to solve this problem by incorporating Multi Criteria Decision Making (MCDM) methods. Nevertheless, another important aspect has raised concerns on obtaining the decision that is the reliability of the information. Decision makers evaluate differently depending on their level of confidence or sureness in the evaluation. This study proposes a decision making procedure for strategic planning using SWOT-TOPSIS method by incorporating the reliability factor of the evaluation based on Z-number. An example using a local authority in the east coast of Malaysia is illustrated to determine the strategic options ranking and to prioritize factors in each SWOT category.

  15. Improving the Reliability of Case-Based Reasoning Systems

    Directory of Open Access Journals (Sweden)

    Xu Xu

    2010-09-01

    also discussed in this paper, especially the property that whether inter-feature of case exists redundancy. After that, the reliability of an individual suggested solution is studied. To illustrate these ideas, some experiments and their results are discussed in this paper. The results of experiments show a new route concerning on how to improve the reliability of a CBR system at an overall level.

  16. PWR system reliability improvement activities

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1985-01-01

    In Japan lacking in energy resources, it is our basic energy policy to accelerate the development program of nuclear power, thereby reducing our dependence. As referred to in the foregoing, every effort has been exerted on our part to improve the PWR system reliability by dint of the so-called 'HOMEMADE' TQC activities, which is our brain-child as a result of applying to the energy industry the quality control philosophy developed in the field of manufacturing industry

  17. Accelerator Availability and Reliability Issues

    Energy Technology Data Exchange (ETDEWEB)

    Steve Suhring

    2003-05-01

    Maintaining reliable machine operations for existing machines as well as planning for future machines' operability present significant challenges to those responsible for system performance and improvement. Changes to machine requirements and beam specifications often reduce overall machine availability in an effort to meet user needs. Accelerator reliability issues from around the world will be presented, followed by a discussion of the major factors influencing machine availability.

  18. Optimal integrated sizing and planning of hubs with midsize/large CHP units considering reliability of supply

    International Nuclear Information System (INIS)

    Moradi, Saeed; Ghaffarpour, Reza; Ranjbar, Ali Mohammad; Mozaffari, Babak

    2017-01-01

    Highlights: • New hub planning formulation is proposed to exploit assets of midsize/large CHPs. • Linearization approaches are proposed for two-variable nonlinear CHP fuel function. • Efficient operation of addressed CHPs & hub devices at contingencies are considered. • Reliability-embedded integrated planning & sizing is formulated as one single MILP. • Noticeable results for costs & reliability-embedded planning due to mid/large CHPs. - Abstract: Use of multi-carrier energy systems and the energy hub concept has recently been a widespread trend worldwide. However, most of the related researches specialize in CHP systems with constant electricity/heat ratios and linear operating characteristics. In this paper, integrated energy hub planning and sizing is developed for the energy systems with mid-scale and large-scale CHP units, by taking their wide operating range into consideration. The proposed formulation is aimed at taking the best use of the beneficial degrees of freedom associated with these units for decreasing total costs and increasing reliability. High-accuracy piecewise linearization techniques with approximation errors of about 1% are introduced for the nonlinear two-dimensional CHP input-output function, making it possible to successfully integrate the CHP sizing. Efficient operation of CHP and the hub at contingencies is extracted via a new formulation, which is developed to be incorporated to the planning and sizing problem. Optimal operation, planning, sizing and contingency operation of hub components are integrated and formulated as a single comprehensive MILP problem. Results on a case study with midsize CHPs reveal a 33% reduction in total costs, and it is demonstrated that the proposed formulation ceases the need for additional components/capacities for increasing reliability of supply.

  19. Reliability of community health worker collected data for planning and policy in a peri-urban area of Kisumu, Kenya.

    Science.gov (United States)

    Otieno, C F; Kaseje, D; Ochieng', B M; Githae, M N

    2012-02-01

    A general introduction of this article is as follows: Reliable and timely health information is an essential foundation of public health action and health systems strengthening, both nationally and internationally (Aqil et al. in Health Policy Plan 24(3): 217-228, 2009; Bradshaw et al. in initial burden of disease estimates for South Africa, 2000. South African Medical Research Council, Cape Town, 2003). The need for sound information is especially urgent in the case of emergent diseases and other acute health threats, where rapid awareness, investigation and response can save lives and prevent broader national outbreaks and even global pandemics (Aqil et al. in Health Policy Plan 24(3): 217-228, 2009). The government of Kenya, through the ministry of public health and sanitation has rolled out the community health strategy as a way of improving health care at the household level. This involves community health workers collecting health status data at the household level, which is then used for dialogue at all the levels to inform decisions and actions towards improvement in health status. A lot of health interventions have involved the community health workers in reaching out to the community, hence successfully implementing these health interventions. Large scale involvement of community health workers in government initiatives and most especially to collect health data for use in the health systems has been minimal due to the assumption that the data may not be useful to the government, because its quality is uncertain. It was therefore necessary that the validity and reliability of the data collected by community health workers be determined, and whether this kind of data can be used for planning and policy formulation for the communities from which it is collected. This would go a long way to settle speculation on whether the data collected by these workers is valid and reliable for use in determining the health status, its causes and distribution, of a

  20. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    Energy Technology Data Exchange (ETDEWEB)

    Kirby, Brendan J [ORNL

    2006-07-01

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second

  1. Improvement of standards on functional reliability of electric power systems

    International Nuclear Information System (INIS)

    Barinov, V.A.; Volkov, G.A.; Kalita, V.V.; Kogan, F.L.; Makarov, S.F.; Manevich, A.S.; Mogirev, V.V.; Sin'chugov, F.I.; Skopintsev, V.A.; Khvoshchinskaya, Z.G.

    1993-01-01

    Analysis of the most principal aspects of the existing standards and requirements on assuring safety and stability of electric power systems (EPS) and effective (reliable and economical) power supply of consumers is given. The reliability is determined as ability to accomplish the assigned functions. Basic recommendations on improving the standards regulating the safety and reliability of the NPP functioning are formulated

  2. Planned reliability in the transport and installation of large nuclear components

    International Nuclear Information System (INIS)

    Bieler, L.

    1988-01-01

    The transport and installation of heavy and bulky large components require detailed planning of all jobs and activities, trained and experienced personnel and corresponding technical equipment for reliable and quality-assured implementation. The correct approach to the planning and implementation of such transports and installations has been confirmed by years of successful performance of these jobs e.g. in reactor pressure vessels and steam generators for nuclear power plants. Large components for nuclear power plants are truly extreme examples but will be all the better suited for demonstrating the problems inherent in transport and installation. (orig.) [de

  3. Assessment of power reliability and improvement potential by using ...

    African Journals Online (AJOL)

    This paper presents the use of smart reclosers for improving reliability of a distribution system of one of the major cities of Ethiopia. As frequent power interruptions are posing a huge problem to the life of the people and the economy, finding a solution to the problem is very essential. Electric reliability has affected social well ...

  4. Improvement of the reliability on nondestructive inspection

    International Nuclear Information System (INIS)

    Song, Sung Jin; Kim, Young H.; Lee, Hyang Beom; Shin, Young Kil; Jung, Hyun Jo; Park, Ik Keun; Park, Eun Soo

    2002-03-01

    Retaining reliabilities of nondestructive testing is essential for the life-time maintenance of Nuclear Power Plant. The nondestructive testing methods which are frequently used in the Nuclear Power Plant are eddy current testing for the inspection of steam generator tubes and ultrasonic testing for the inspection of weldments. In order to improve reliabilities of ultrasonic testing and eddy current testing, the subjects carried out in this study are as follows : development of BEM analysis technique for ECT of SG tube, development of neural network technique for the intelligent analysis of ECT flaw signals of SG tubes, development of RFECT technology for the inspection of SG tube, FEM analysis of ultrasonic scattering field, evaluation of statistical reliability of PD-RR test of ultrasonic testing and development of multi-Gaussian beam modeling technique to predict accurate signal of signal beam ultrasonic testing with the efficiency in calculation time

  5. Improvement of the reliability on nondestructive inspection

    Energy Technology Data Exchange (ETDEWEB)

    Song, Sung Jin; Kim, Young H. [Sungkyunkwan Univ., Suwon (Korea, Republic of); Lee, Hyang Beom [Soongsil Univ., Seoul (Korea, Republic of); Shin, Young Kil [Kunsan National Univ., Gunsan (Korea, Republic of); Jung, Hyun Jo [Wonkwang Univ., Iksan (Korea, Republic of); Park, Ik Keun; Park, Eun Soo [Seoul Nationl Univ., Seoul (Korea, Republic of)

    2002-03-15

    Retaining reliabilities of nondestructive testing is essential for the life-time maintenance of Nuclear Power Plant. The nondestructive testing methods which are frequently used in the Nuclear Power Plant are eddy current testing for the inspection of steam generator tubes and ultrasonic testing for the inspection of weldments. In order to improve reliabilities of ultrasonic testing and eddy current testing, the subjects carried out in this study are as follows : development of BEM analysis technique for ECT of SG tube, development of neural network technique for the intelligent analysis of ECT flaw signals of SG tubes, development of RFECT technology for the inspection of SG tube, FEM analysis of ultrasonic scattering field, evaluation of statistical reliability of PD-RR test of ultrasonic testing and development of multi-Gaussian beam modeling technique to predict accurate signal of signal beam ultrasonic testing with the efficiency in calculation time.

  6. Reliability worth assessment of radial systems with distributed generation

    OpenAIRE

    Bellart Llavall, Francesc Xavier

    2010-01-01

    With recent advances in technology, utilities generation (DG) on the distribution systems. Reliability worth is very important in power system planning and operation. Having a DG ensures reli increase the reliability worth. This research project presents the study of a radial distribution system and the impact of placing DG in order to increase the reliability worth. where a DG have to be placed. The reliability improvement is measured by different reliability indices tha...

  7. Improvement on reliability of control system in power plant

    International Nuclear Information System (INIS)

    Taguchi, S.; Mizumoto, T.; Hirose, Y.; Kashiwai, J.; Takami, I.; Shono, M.; Roji, Y.; Kizaki, S.

    1985-01-01

    Studies made of Japanese PWR operating experiences have revealed that failures in the control system are the primary causes of unscheduled shutdowns. An attempt has, therefore, been made to improve the reliability of the control system in order to raise the plant reliability. The following are the procedures applied to solve the issue; study of operating experiences, fault tree analysis and failure mode and effects analysis. Improvement measures are developed for the control system whose failure threatens to cause the plant trip during the plant life. These systems are the main feedwater control system, rod control system, pressurizer control system and main steam control system in the primary control system. As a result, the plant unavailability is expected to be reduced significantly by applying the improvements. The improvements are applied to the plants under construction and the operating plants in co-operation with utilities and vendors. (author)

  8. 42 CFR 441.474 - Quality assurance and improvement plan.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Quality assurance and improvement plan. 441.474... improvement plan. (a) The State must provide a quality assurance and improvement plan that describes the State... pursue opportunities for system improvement. (b) The quality assurance and improvement plan shall also...

  9. Reliability Improved Cooperative Communication over Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Zhuangbin Chen

    2017-10-01

    Full Text Available With the development of smart devices and connection technologies, Wireless Sensor Networks (WSNs are becoming increasingly intelligent. New or special functions can be obtained by receiving new versions of program codes to upgrade their software systems, forming the so-called smart Internet of Things (IoT. Due to the lossy property of wireless channels, data collection in WSNs still suffers from a long delay, high energy consumption, and many retransmissions. Thanks to wireless software-defined networks (WSDNs, software in sensors can now be updated to help them transmit data cooperatively, thereby achieving more reliable communication. In this paper, a Reliability Improved Cooperative Communication (RICC data collection scheme is proposed to improve the reliability of random-network-coding-based cooperative communications in multi-hop relay WSNs without reducing the network lifetime. In WSNs, sensors in different positions can have different numbers of packets to handle, resulting in the unbalanced energy consumption of the network. In particular, nodes in non-hotspot areas have up to 90% of their original energy remaining when the network dies. To efficiently use the residual energy, in RICC, high data transmission power is adopted in non-hotspot areas to achieve a higher reliability at the cost of large energy consumption, and relatively low transmission power is adopted in hotspot areas to maintain the long network lifetime. Therefore, high reliability and a long network lifetime can be obtained simultaneously. The simulation results show that compared with other scheme, RICC can reduce the end-to-end Message Fail delivering Ratio (MFR by 59.4%–62.8% under the same lifetime with a more balanced energy utilization.

  10. Distribution planning with reliability options for distributed generation

    International Nuclear Information System (INIS)

    Trebolle, David; Gomez, Tomas; Cossent, Rafael; Frias, Pablo

    2010-01-01

    The promotion of electricity generation from renewable energy sources (RES) and combined heat and power (CHP) has resulted in increasing penetration levels of distributed generation (DG). However, large-scale connection of DG involves profound changes in the operation and planning of electricity distribution networks. Distribution System Operators (DSOs) play a key role since these agents have to provide flexibility to their networks in order to integrate DG. Article 14.7 of EU Electricity Directive states that DSOs should consider DG as an alternative to new network investments. This is a challenging task, particularly under the current regulatory framework where DSOs must be legally and functionally unbundled from other activities in the electricity sector. This paper proposes a market mechanism, referred to as reliability options for distributed generation (RODG), which provides DSOs with an alternative to the investment in new distribution facilities. The mechanism proposed allocates the firm capacity required to DG embedded in the distribution network through a competitive auction. Additionally, RODG make DG partly responsible for reliability and provide DG with incentives for a more efficient operation taking into account the network conditions. (author)

  11. Distribution planning with reliability options for distributed generation

    Energy Technology Data Exchange (ETDEWEB)

    Trebolle, David [Union Fenosa Distribucion, C/Antonio Lopez, 19, 28026 Madrid (Spain); Gomez, Tomas; Cossent, Rafael; Frias, Pablo [Instituto de Investigacion Tecnologica, Escuela Tecnica Superior de Ingenieria, Universidad Pontificia Comillas, C/Quintana 21, 28008 Madrid (Spain)

    2010-02-15

    The promotion of electricity generation from renewable energy sources (RES) and combined heat and power (CHP) has resulted in increasing penetration levels of distributed generation (DG). However, large-scale connection of DG involves profound changes in the operation and planning of electricity distribution networks. Distribution System Operators (DSOs) play a key role since these agents have to provide flexibility to their networks in order to integrate DG. Article 14.7 of EU Electricity Directive states that DSOs should consider DG as an alternative to new network investments. This is a challenging task, particularly under the current regulatory framework where DSOs must be legally and functionally unbundled from other activities in the electricity sector. This paper proposes a market mechanism, referred to as reliability options for distributed generation (RODG), which provides DSOs with an alternative to the investment in new distribution facilities. The mechanism proposed allocates the firm capacity required to DG embedded in the distribution network through a competitive auction. Additionally, RODG make DG partly responsible for reliability and provide DG with incentives for a more efficient operation taking into account the network conditions. (author)

  12. Reliability-Based Planning of Inspection, Operation and Maintenance for Offshore Oil & Gas Structures and Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2011-01-01

    Reliability-based cost-optimal planning of inspection, maintenance and operation has many applications. In this paper applications for planning of inspections for oil & gas jacket structures and of operation and maintenance of offshore wind turbines are described and illustrated by examples....

  13. 78 FR 73112 - Monitoring System Conditions-Transmission Operations Reliability Standards; Interconnection...

    Science.gov (United States)

    2013-12-05

    ...\\ \\8\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, 72 FR 16416 (Apr. 4... operators and reliability coordinators to ``plan and operate the interconnected Bulk Electric System in a... mandated in the currently- effective standards, thereby improving reliability of the bulk power system...

  14. Between Flexibility and Reliability. Changing Planning Culture in China

    Directory of Open Access Journals (Sweden)

    Chiu-Yuan Wang

    2014-10-01

    Full Text Available The aim of this research is to provide an outline to address questions with regard to the transformation of planning in China that has occurred after the 1980s. The research is using “planning evolution” as the main research skeleton. The starting point is to investigate to what extent Chinese urban planning has developed after the opening up and other reforms under the state-led and market-driven modes of Chinese reformation, and to investigate how the different modes and various actors have influenced urban planning, based on the investigation of the respective political and economic changes within the initial reformation in general, and planning in particular. In recent years, China has undeniably undergone a dramatic process of urban growth and transformation. Apart from its speed and scope, it is less recognized that these processes are confronting the Chinese planning institutions with new and unexpected demands almost on a daily basis. In reference to the increasing importance of private investments and developments within the Chinese urbanization process, a new balance between public planning and private developments, and between top-down and bottom-up approaches is required to be able to generate both a reliable and responsible framework for long-term urban development and a flexible system of implementation that meets the needs of changing conditions and new demands. Flexibility and reliability become the new demands for planning practice. Based on the theory of planning culture, planning traditions, concepts, systems and decision-making processes are always related to the cultural context and cultural background of the people and societies involved. Investigating the contemporary urban transformation and urban development processes in China can allow us to outline the new planning culture of contemporary China in relation to its historical roots and traditional characteristics in a long term framework. I argue that the changing

  15. System ergonomics as an approach to improve human reliability

    International Nuclear Information System (INIS)

    Bubb, H.

    1988-01-01

    The application of system technics on ergonomical problems is called system ergonomics. This enables improvements of human reliability by design measures. The precondition for this is the knowledge of how information processing is performed by man and machine. By a separate consideration of sensory processing, cognitive processing, and motory processing it is possible to have a more exact idea of the system element 'man'. The system element 'machine' is well described by differential equations which allow an ergonomical assessment of the manouverability. The knowledge of information processing of man and machine enables a task analysis. This makes appear on one hand the human boundaries depending on the different properties of the task and on the other hand suitable ergonomical solution proposals which improve the reliability of the total system. It is a disadvantage, however, that the change of human reliability by such measures may not be quoted numerically at the moment. (orig.)

  16. 45 CFR 1304.60 - Deficiencies and quality improvement plans.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Deficiencies and quality improvement plans. 1304... must correct the deficiency either immediately or pursuant to a Quality Improvement Plan. (c) An Early... Improvement Plan must submit to the responsible HHS official a Quality Improvement Plan specifying, for each...

  17. Reliability and risk-based planning of operation and maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Florian, Mihai; Berzonskis, Arvydas

    2016-01-01

    costly (and safe), and it is important to include in the reliability assessment the information obtained during operation (from condition monitoring and inspections) and the maintenance performed (incl. repairs and replacements). The paper presents a risk-based approach for optimal planning of Operation...

  18. Designing incentive market mechanisms for improving restructured power system reliabilities

    DEFF Research Database (Denmark)

    Ding, Yi; Østergaard, Jacob; Wu, Qiuwei

    2011-01-01

    state. The reliability management of producers usually cannot be directly controlled by the system operators in a restructured power system. Producers may have no motivation to improve their reliabilities, which can result in serious system unreliability issues in the new environment. Incentive market...... mechanisms for improving the restructured power system reliabilities have been designed in this paper. In the proposed incentive mechanisms, penalty will be implemented on a producer if the failures of its generator(s) result in the variation of electricity prices. Incentive market mechanisms can motivate......In a restructured power system, the monopoly generation utility is replaced by different electricity producers. There exists extreme price volatility caused by random failures by generation or/and transmission systems. In these cases, producers' profits can be much higher than those in the normal...

  19. Current and planned numerical development for improving computing performance for long duration and/or low pressure transients

    International Nuclear Information System (INIS)

    Faydide, B.

    1997-01-01

    This paper presents the current and planned numerical development for improving computing performance in case of Cathare applications needing real time, like simulator applications. Cathare is a thermalhydraulic code developed by CEA (DRN), IPSN, EDF and FRAMATOME for PWR safety analysis. First, the general characteristics of the code are presented, dealing with physical models, numerical topics, and validation strategy. Then, the current and planned applications of Cathare in the field of simulators are discussed. Some of these applications were made in the past, using a simplified and fast-running version of Cathare (Cathare-Simu); the status of the numerical improvements obtained with Cathare-Simu is presented. The planned developments concern mainly the Simulator Cathare Release (SCAR) project which deals with the use of the most recent version of Cathare inside simulators. In this frame, the numerical developments are related with the speed up of the calculation process, using parallel processing and improvement of code reliability on a large set of NPP transients

  20. Current and planned numerical development for improving computing performance for long duration and/or low pressure transients

    Energy Technology Data Exchange (ETDEWEB)

    Faydide, B. [Commissariat a l`Energie Atomique, Grenoble (France)

    1997-07-01

    This paper presents the current and planned numerical development for improving computing performance in case of Cathare applications needing real time, like simulator applications. Cathare is a thermalhydraulic code developed by CEA (DRN), IPSN, EDF and FRAMATOME for PWR safety analysis. First, the general characteristics of the code are presented, dealing with physical models, numerical topics, and validation strategy. Then, the current and planned applications of Cathare in the field of simulators are discussed. Some of these applications were made in the past, using a simplified and fast-running version of Cathare (Cathare-Simu); the status of the numerical improvements obtained with Cathare-Simu is presented. The planned developments concern mainly the Simulator Cathare Release (SCAR) project which deals with the use of the most recent version of Cathare inside simulators. In this frame, the numerical developments are related with the speed up of the calculation process, using parallel processing and improvement of code reliability on a large set of NPP transients.

  1. An integrated reliability management system for nuclear power plants

    International Nuclear Information System (INIS)

    Kimura, T.; Shimokawa, H.; Matsushima, H.

    1998-01-01

    The responsibility in the nuclear field of the Government, utilities and manufactures has increased in the past years due to the need of stable operation and great reliability of nuclear power plants. The need to improve the reliability is not only for the new plants but also for those now running. So, several measures have been taken to improve reliability. In particular, the plant manufactures have developed a reliability management system for each phase (planning, construction, maintenance and operation) and these have been integrated as a unified system. This integrated reliability management system for nuclear power plants contains information about plant performance, failures and incidents which have occurred in the plants. (author)

  2. Planning ahead: Improving escalation plans before the weekend.

    Science.gov (United States)

    Zarkali, Angeliki; Black, Duncan; Smee, Elizabeth; Deshraj, Anshul; Smallwood, Nicholas

    2014-01-01

    Handover is the system by which responsibility for patient care is transferred between healthcare professionals. A significant aspect of handover is the existence of an escalation plan for each patient in case of deterioration over the weekend. According to the Royal College of Physicians, all patients should have a clear escalation plan documented in the notes before a weekend, since parent medical teams (Consultant team in charge of care) are best placed to make these decisions. If left to on-call teams, at a time of deterioration over a weekend, they might not have all available information, the patient might be unable to be involved in the decisions, and the family might not be consulted. With this is mind, we decided to analyse the existing handover process in a medium sized district general hospital, with the aim of improving the process and the documentation of escalation plans. The results from our retrospective analysis of the system in place revealed a significant lack of documentation of escalation plans in the medical notes. Three sample wards were selected to analyse the current handover system and test proposed measures before hospital-wide implementation. After trialling of a physical handover meeting in addition to the existing intranet system and a proforma for the Friday ward round, the documentation of escalation plans in the patients' notes improved from 9.1% to 41.1%. Based on these results, as well as formal feedback from junior doctors and informal feedback from other staff, the physical handover meeting and Friday ward round proforma will be implemented throughout the Trust. Our interventions led to an improvement in the documentation of escalation plans in our hospital, thus saving precious time in the event of a patient's deterioration. This also ensures that families and patients are involved in the decision making process and kept informed, and reduces the burden for the weekend on-call teams.

  3. Technology and equipment to improve reliability of pipeline transport

    Science.gov (United States)

    Suleimanov, D. F.; Shulayev, N. S.; Bondar, K. E.; Laponov, S. V.; Uzinger, A. A.

    2017-10-01

    The article is dedicated to development of technology and hardware design of method pipeline transport reliability improving by improving the isolated coating properties modified by microwave radiation. The article describes the technology of the modification process of the coating and instrumentation production, which allows improving operational properties not only in stationary conditions in the manufacture of the insulation coating, but also during its replacement in the field.

  4. Aviation Fuel System Reliability and Fail-Safety Analysis. Promising Alternative Ways for Improving the Fuel System Reliability

    Directory of Open Access Journals (Sweden)

    I. S. Shumilov

    2017-01-01

    Full Text Available The paper deals with design requirements for an aviation fuel system (AFS, AFS basic design requirements, reliability, and design precautions to avoid AFS failure. Compares the reliability and fail-safety of AFS and aircraft hydraulic system (AHS, considers the promising alternative ways to raise reliability of fuel systems, as well as elaborates recommendations to improve reliability of the pipeline system components and pipeline systems, in general, based on the selection of design solutions.It is extremely advisable to design the AFS and AHS in accordance with Aviation Regulations АП25 and Accident Prevention Guidelines, ICAO (International Civil Aviation Association, which will reduce risk of emergency situations, and in some cases even avoid heavy disasters.ATS and AHS designs should be based on the uniform principles to ensure the highest reliability and safety. However, currently, this principle is not enough kept, and AFS looses in reliability and fail-safety as compared with AHS. When there are the examined failures (single and their combinations the guidelines to ensure the AFS efficiency should be the same as those of norm-adopted in the Regulations АП25 for AHS. This will significantly increase reliability and fail-safety of the fuel systems and aircraft flights, in general, despite a slight increase in AFS mass.The proposed improvements through the use of components redundancy of the fuel system will greatly raise reliability of the fuel system of a passenger aircraft, which will, without serious consequences for the flight, withstand up to 2 failures, its reliability and fail-safety design will be similar to those of the AHS, however, above improvement measures will lead to a slightly increasing total mass of the fuel system.It is advisable to set a second pump on the engine in parallel with the first one. It will run in case the first one fails for some reasons. The second pump, like the first pump, can be driven from the

  5. Advanced solutions for operational reliability improvements

    Energy Technology Data Exchange (ETDEWEB)

    Holmberg, K [VTT Manufacturing Technology, Espoo (Finland)

    1998-12-31

    A great number of new technical tools are today developed for improved operational reliability of machines and industrial equipment. Examples of such techniques and tools recently developed at the Technical Research Centre of Finland (VTT) are: metallographic approach for steam-piping lifetime estimation, an expert system AURORA for corrosion prediction and material selection, an automatic image-processing-based on-line wear particle analysis system, microsensors for condition monitoring, a condition monitoring and expert system, CEPDIA, for the diagnosis of centrifugal pumps, a machine tool analysis and diagnostic expert system, non-leakage magnetic fluid seals with extended lifetime and diamond-like surface coatings on components with decreased friction and wear properties. A hyperbook-supported holistic approach to problem solving in maintenance and reliability engineering has been developed to help the user achieve a holistic understanding of the problem and its relationships, to navigate among the several technical tools and methods available, and to find those suitable for his application. (orig.)

  6. Advanced solutions for operational reliability improvements

    Energy Technology Data Exchange (ETDEWEB)

    Holmberg, K. [VTT Manufacturing Technology, Espoo (Finland)

    1997-12-31

    A great number of new technical tools are today developed for improved operational reliability of machines and industrial equipment. Examples of such techniques and tools recently developed at the Technical Research Centre of Finland (VTT) are: metallographic approach for steam-piping lifetime estimation, an expert system AURORA for corrosion prediction and material selection, an automatic image-processing-based on-line wear particle analysis system, microsensors for condition monitoring, a condition monitoring and expert system, CEPDIA, for the diagnosis of centrifugal pumps, a machine tool analysis and diagnostic expert system, non-leakage magnetic fluid seals with extended lifetime and diamond-like surface coatings on components with decreased friction and wear properties. A hyperbook-supported holistic approach to problem solving in maintenance and reliability engineering has been developed to help the user achieve a holistic understanding of the problem and its relationships, to navigate among the several technical tools and methods available, and to find those suitable for his application. (orig.)

  7. Training Improves Interobserver Reliability for the Diagnosis of Scaphoid Fracture Displacement

    NARCIS (Netherlands)

    Buijze, Geert A.; Guitton, Thierry G.; van Dijk, C. Niek; Ring, David; Osterman, A. Lee; Wahegaonkar, Abhijeet L.; Ladd, Amy; Barquet, Antonio; van Vugt, Arie B.; Shyam, Ashok K.; Swigart, Carrie; Coles, Chad P.; Zalavras, Charalampos; Goldfarb, Charles A.; Cassidy, Charles; Allan, Christopher; Beingessner, Daphne; Kalainov, David M.; Eygendaal, Denise; Sancheti, Parag; Feibel, Robert J.; Rocha, Steve; Grosso, Elena; Frihagen, Frede; Dyer, George S. M.; Athwal, George S.; Goslings, J. Carel; Della Rocca, Gregory J.; Harris, Ian; Fanuele, Jason C.; Lawton, Jeff; Jiuliano, John; McAuliffe, John; Capo, John T.; Conflitti, Joseph M.; Segalman, Keith; Egol, Kenneth; Ponsen, Kornelis J.; Jeray, Kyle; Lattanza, Lisa; Catalano, Louis; Swiontkowski, Marc; Boyer, Martin; Richardson, Martin; Soong, Maximillian; Baskies, Michael; Prayson, Michael; McKee, Michael; Chen, Neal C.; Kloen, Peter

    2012-01-01

    The diagnosis of displacement in scaphoid fractures is notorious for poor interobserver reliability. We tested whether training can improve interobserver reliability and sensitivity, specificity, and accuracy for the diagnosis of scaphoid fracture displacement on radiographs and CT scans. Sixty-four

  8. Review of Reliability Assessment of Westinghouse SSPS Using SPC by WEC

    International Nuclear Information System (INIS)

    Kang, H. T.; Chung, H. Y.

    2007-01-01

    Westinghouse Electric Company (WEC) has accomplished the reliability assessment of Westinghouse Solid State Protection System (SSPS) in KORI no. 2, 3, 4, and YGN no. 1, 2. In their studies, it is reported that creating a cost-effective plan for improving the reliability of the SSPS and at KORI no. 2, 3 and 4, and YGN no. 1, 2 should be needed while reducing their maintenance cost. In this paper, we reviewed the reliability assessment of Westinghouse SSPS analyzed in two performance standards, availability, and the maintenance expense using Statistic Process Control (SPC). As a result, it is concluded all plants have several failures reported but no effect on the system's availability, and the maintenance expense analysis did not reduce the current maintenance expense by 30%. Therefore, overall review for the reliability assessment is that a new strategy for cost-effective plan and/or upgrade approach for improving the reliability of the aging Westinghouse SSPS should be needed

  9. Improving IMRT-plan quality with MLC leaf position refinement post plan optimization

    International Nuclear Information System (INIS)

    Niu Ying; Zhang Guowei; Berman, Barry L.; Parke, William C.; Yi Byongyong; Yu, Cedric X.

    2012-01-01

    Purpose: In intensity-modulated radiation therapy (IMRT) planning, reducing the pencil-beam size may lead to a significant improvement in dose conformity, but also increase the time needed for the dose calculation and plan optimization. The authors develop and evaluate a postoptimization refinement (POpR) method, which makes fine adjustments to the multileaf collimator (MLC) leaf positions after plan optimization, enhancing the spatial precision and improving the plan quality without a significant impact on the computational burden. Methods: The authors’ POpR method is implemented using a commercial treatment planning system based on direct aperture optimization. After an IMRT plan is optimized using pencil beams with regular pencil-beam step size, a greedy search is conducted by looping through all of the involved MLC leaves to see if moving the MLC leaf in or out by half of a pencil-beam step size will improve the objective function value. The half-sized pencil beams, which are used for updating dose distribution in the greedy search, are derived from the existing full-sized pencil beams without need for further pencil-beam dose calculations. A benchmark phantom case and a head-and-neck (HN) case are studied for testing the authors’ POpR method. Results: Using a benchmark phantom and a HN case, the authors have verified that their POpR method can be an efficient technique in the IMRT planning process. Effectiveness of POpR is confirmed by noting significant improvements in objective function values. Dosimetric benefits of POpR are comparable to those of using a finer pencil-beam size from the optimization start, but with far less computation and time. Conclusions: The POpR is a feasible and practical method to significantly improve IMRT-plan quality without compromising the planning efficiency.

  10. Improving fMRI reliability in presurgical mapping for brain tumours.

    Science.gov (United States)

    Stevens, M Tynan R; Clarke, David B; Stroink, Gerhard; Beyea, Steven D; D'Arcy, Ryan Cn

    2016-03-01

    Functional MRI (fMRI) is becoming increasingly integrated into clinical practice for presurgical mapping. Current efforts are focused on validating data quality, with reliability being a major factor. In this paper, we demonstrate the utility of a recently developed approach that uses receiver operating characteristic-reliability (ROC-r) to: (1) identify reliable versus unreliable data sets; (2) automatically select processing options to enhance data quality; and (3) automatically select individualised thresholds for activation maps. Presurgical fMRI was conducted in 16 patients undergoing surgical treatment for brain tumours. Within-session test-retest fMRI was conducted, and ROC-reliability of the patient group was compared to a previous healthy control cohort. Individually optimised preprocessing pipelines were determined to improve reliability. Spatial correspondence was assessed by comparing the fMRI results to intraoperative cortical stimulation mapping, in terms of the distance to the nearest active fMRI voxel. The average ROC-r reliability for the patients was 0.58±0.03, as compared to 0.72±0.02 in healthy controls. For the patient group, this increased significantly to 0.65±0.02 by adopting optimised preprocessing pipelines. Co-localisation of the fMRI maps with cortical stimulation was significantly better for more reliable versus less reliable data sets (8.3±0.9 vs 29±3 mm, respectively). We demonstrated ROC-r analysis for identifying reliable fMRI data sets, choosing optimal postprocessing pipelines, and selecting patient-specific thresholds. Data sets with higher reliability also showed closer spatial correspondence to cortical stimulation. ROC-r can thus identify poor fMRI data at time of scanning, allowing for repeat scans when necessary. ROC-r analysis provides optimised and automated fMRI processing for improved presurgical mapping. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence

  11. The experiences to improve plant performance and reliability of Ko-Ri nuclear power plants

    International Nuclear Information System (INIS)

    Kang, Ho Weon

    1998-01-01

    This paper provides a discussion of the lessons learned from operational experience and the future plans to improve performance of the Ko-Ri plant. To operate nuclear power plants safely with good performance is the only way to mitigate the negative image of nuclear power generation to the public and to enhance the economical benefit compared to other electrical generation method. Therefore, in a continuous effort to overcome a negative challenge from outside, we have driven an aggressive 'OCTF' campaign as part of safety. As a result of our efforts, the following remarkable achievements have been accomplished. (1) 3 times of OCTF during recent three years (2) Selected twice as a top notch power plant on the list of NEI magazine in terms of plant capacity factor (3) No scram recorded in 1997 for all 4 units at Ko-Ri site. Ko-Ri is now undergoing the large scale plant betterment projects for retaking-off our operating performance to the level of new challenge target. Such improvement of critical components in the reactor coolant system and turbine system greatly contribute to increase the safety and reliability of the plant and to shortening of the planned outage period as well as to reduction of radiation exposure and radwaste. (Cho, G. S.). 5 tabs., 10 figs

  12. Improving human reliability through better nuclear power plant system design. Progress report

    International Nuclear Information System (INIS)

    Golay, M.W.

    1995-01-01

    The project on open-quotes Development of a Theory of the Dependence of Human Reliability upon System Designs as a Means of Improving Nuclear Power Plant Performanceclose quotes has been undertaken in order to address the important problem of human error in advanced nuclear power plant designs. Most of the creativity in formulating such concepts has focused upon improving the mechanical reliability of safety related plant systems. However, the lack of a mature theory has retarded similar progress in reducing the likely frequencies of human errors. The main design mechanism used to address this class of concerns has been to reduce or eliminate the human role in plant operations and accident response. The plan of work being pursued in this project is to perform a set of experiments involving human subject who are required to operate, diagnose and respond to changes in computer-simulated systems, relevant to those encountered in nuclear power plants. In the tests the systems are made to differ in complexity in a systematic manner. The computer program used to present the problems to be solved also records the response of the operator as it unfolds. Ultimately this computer is also to be used in compiling the results of the project. The work of this project is focused upon nuclear power plant applications. However, the persuasiveness of human errors in using all sorts of electromechanical machines gives it a much greater potential importance. Because of this we are attempting to pursue our work in a fashion permitting broad generalizations

  13. Improving patient safety: patient-focused, high-reliability team training.

    Science.gov (United States)

    McKeon, Leslie M; Cunningham, Patricia D; Oswaks, Jill S Detty

    2009-01-01

    Healthcare systems are recognizing "human factor" flaws that result in adverse outcomes. Nurses work around system failures, although increasing healthcare complexity makes this harder to do without risk of error. Aviation and military organizations achieve ultrasafe outcomes through high-reliability practice. We describe how reliability principles were used to teach nurses to improve patient safety at the front line of care. Outcomes include safety-oriented, teamwork communication competency; reflections on safety culture and clinical leadership are discussed.

  14. Improve strategic supplier performance using DMAIC to develop a Quality Improvement Plan

    Science.gov (United States)

    Jardim, Kevin P.

    Supplier performance that meets the requirements of the customer has long plagued quality professionals. Despite the vast efforts by organizations to improve supplier performance, little has been done to standardize the plan to improve performance. This project presents a guideline and problem-solving strategy using a Define, Measure, Analyze, Improve, and Control (DMAIC) structured tool that will assist in the management and improvement of supplier performance. An analysis of benchmarked Quality Improvement Plans indicated that this topic needs more focus on how to accomplish improved supplier performance. This project is part of a growing body of supplier continuous improvement efforts. With the input of Zodiac Aerospace quality professionals this project's results provide a solution to Quality Improvement Plans and show objective evidence of its benefits. This project contributes to the future research on similar topics.

  15. Advanced control systems to improve nuclear power plant reliability and efficiency

    International Nuclear Information System (INIS)

    1997-07-01

    The TECDOC is the result of a series of an advisory and consultants meetings held by the IAEA in 1995-1996 in Vienna (March 1995), in Erlangen Germany (December 1995), in Garching, Germany (June 1996) and in Vienna (November 1996). It was prepared with the participation and contributions of experts from Austria, Canada, Finland, France, Germany, the Republic of Korea, Norway, the Russian Federation, the United Kingdom and the United States of America. The publication not only describes advanced control systems for the improvement of nuclear power plant reliability and efficiency, but also provides a road map to guide interested readers to plan and execute an advanced instrumentation and control project. The subjects include: identification of needs and requirements, justification for safety and user acceptance, and the development of an engineering process. The report should be of interest to nuclear power plant staff, I and C system designers and integrators as well as regulators and researchers. Refs, figs, tabs

  16. Advanced control systems to improve nuclear power plant reliability and efficiency

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The TECDOC is the result of a series of an advisory and consultants meetings held by the IAEA in 1995-1996 in Vienna (March 1995), in Erlangen Germany (December 1995), in Garching, Germany (June 1996) and in Vienna (November 1996). It was prepared with the participation and contributions of experts from Austria, Canada, Finland, France, Germany, the Republic of Korea, Norway, the Russian Federation, the United Kingdom and the United States of America. The publication not only describes advanced control systems for the improvement of nuclear power plant reliability and efficiency, but also provides a road map to guide interested readers to plan and execute an advanced instrumentation and control project. The subjects include: identification of needs and requirements, justification for safety and user acceptance, and the development of an engineering process. The report should be of interest to nuclear power plant staff, I and C system designers and integrators as well as regulators and researchers. Refs, figs, tabs.

  17. Evaluation and improvement of nondestructive evaluation reliability for inservice inspection of light water reactors

    International Nuclear Information System (INIS)

    Bates, D.J.; Deffenbaugh, J.D.; Good, M.S.; Heasler, P.G.; Mart, G.A.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T.; Van Fleet, L.G.

    1987-01-01

    The Evaluation and Improvement of NDE Reliability for Inservice Inspection (ISI) of Light Water Reactors (NDE Reliability) Program at Pacific Northwest Laboratory (PNL) was established to determine the reliability of current ISI techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this NRC program are to: determine the reliability of ultrasonic ISI performed on commercial light-water reactor (LWR) primary systems, using probabilistic fracture mechanics analysis, determine the impact of NDE unreliability on system safety and determine the level of inspection reliability required to ensure a suitably low failure probability, evaluate the degree of reliability improvement that could be achieved using improved and advanced NDE techniques, based on material properties, service conditions, and NDE uncertainties, recommend revisions to ASME Code, Section XI, and Regulatory Requirements that will ensure suitably low failure probabilities. The scope of this program is limited to ISI of primary systems; the results and recommendations may also be applicable to Class II piping systems

  18. Evaluation and improvement in nondestructive examination (NDE) reliability for in-service inspection of light water reactors

    International Nuclear Information System (INIS)

    Deffenbaugh, J.D.; Good, M.S.; Green, E.R.; Heasler, P.G.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T.

    1988-01-01

    The evaluation and improvement of NDE Reliability for In-service Inspection (ISI) of Light Water Reactors (NDE Reliability) Program at Pacific Northwest Laboratory (PNL) was established to determine the reliability of current ISI techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this NRC program are to: determine the reliability of ultrasonic ISI performed on commercial light-water reactor (LWR) primary systems; determine the impact of NDE unreliability on system safety and determine the level of inspection reliability required to ensure a suitably low failure probability using probabilistic fracture mechanics analysis; evaluate the degree of reliability improvement that could be achieved using improved and advanced NDE technique; and recommend revisions to ASME Code, Section XI, and Regulatory Requirements, based on material properties, service conditions, and NDE uncertainties, that will ensure suitably low failure probabilities. The program consists of three basic tasks: a Piping task, a Pressure Vessel task, and an Evaluation and Improvement in NDE Reliability task. The major efforts were concentrated in the Piping task and the Evaluation and Improvement in NDE Reliability task

  19. Software Engineering Improvement Activities/Plan

    Science.gov (United States)

    2003-01-01

    bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14). Work accomplishments included development, evaluation, and enhancement of a software cost model, performing literature search and evaluation of software tools available for code analysis and requirements analysis, and participating in other relevant software engineering activities. Monthly reports were submitted. This support was provided to the Flight Software Group/ED 1 4 in accomplishing the software engineering improvement engineering activities of the Marshall Space Flight Center (MSFC) Software Engineering Improvement Plan.

  20. Using Optimization to Improve Test Planning

    Science.gov (United States)

    2017-09-01

    OPTIMIZATION TO IMPROVE TEST PLANNING by Arlene M. Payne September 2017 Thesis Advisor: Jeffrey E. Kline Second Reader: Oleg A. Yakimenko THIS... Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE September 2017 3. REPORT TYPE AND DATES COVERED Master’s...thesis 4. TITLE AND SUBTITLE USING OPTIMIZATION TO IMPROVE TEST PLANNING 5. FUNDING NUMBERS 6. AUTHOR(S) Arlene M. Payne 7. PERFORMING ORGANIZATION

  1. 77 FR 27574 - Automatic Underfrequency Load Shedding and Load Shedding Plans Reliability Standards

    Science.gov (United States)

    2012-05-11

    ....'' \\33\\ \\33\\ NERC Comments at 8. 45. EEI, MISO, and G&T Cooperatives support the timelines in Reliability... rushed. EEI, MISO, and G&T Cooperatives state that planning coordinators can complete analyses of less... G&T Cooperatives, assessments of complex events can be time and resource intensive. Thus, we agree...

  2. Improvement of reliability of heater and condenser

    International Nuclear Information System (INIS)

    Yamagishi, Hiroki

    1988-01-01

    Recently, the diversification of the operation modes of power plants has advanced as well as daily start and stop and weekly start and stop operations, as the result, the needs for the reliability improvement of various heat exchangers around steam turbines heighten. In newly constructed plants, the design to meet this demand is carried out, but also in existing platns, the application of the latest technology is investigated. As for the reliability of condensers, aluminum brass cooling tubes have been used by doing the optimal maintenance and taking the measures against deposit attack. In the case of requiring high reliability, the examples of adopting titanium cooling tubes increased. The technology of titanium tube condensers, completely assembled condensers, the replacement of existing brass tubes with titanium tubes and so on are discussed. In the case of feed heaters, the deterioration phenomena due to the lapse of long years, such as the attack of steel tube inlet, the drain attack on the external surfaces of steel tubes, the ammonia attack of aluminum brass tubes and the adhesion of scale to heaters, are explained, and the countermeasures are shown. (Kako, I.)

  3. Improving Reliability, Security, and Efficiency of Reconfigurable Hardware Systems (Habilitation)

    NARCIS (Netherlands)

    Ziener, Daniel

    2017-01-01

    In this treatise,  my research on methods to improve efficiency, reliability, and security of reconfigurable hardware systems, i.e., FPGAs, through partial dynamic reconfiguration is outlined. The efficiency of reconfigurable systems can be improved by loading optimized data paths on-the-fly on an

  4. System 80+ Design and Licensing : Improving Plant Reliability

    International Nuclear Information System (INIS)

    Newman, Robert E.

    1989-01-01

    The U. S. nuclear industry is striving to improve plant reliability and availability through improved plant design, component designs and plant maintenance. In an effort to improve safety and to demonstrate that commercial nuclear power is economically competitive with other energy sources, the utilities, nuclear vendors, architect engineers and constructors, and component suppliers are all participating in an industry-wide effort to develop improved Light Water Reactor (LWR) designs that are based upon the many years of successful LWR operation. In an age when the world faces the environmental pressures of the greenhouse effect and acid rain, electricity generated from nuclear energy must play an increasing role in the energy picture of Korea, the United States and the rest of the world. This paper discusses the plant availability requirement that has been established by the industry-wide effort mentioned above. After briefly describing Combustion Engineering's program for development of the System 80 Plus standard design and the participation of the Korea Advanced Energy Research Institute (KAERI) in the program, the paper then describes the design features that are being incorporated into System 80+. The industry ALRR Program has established a very ambitious criterion of 87% for the plant availability of future nuclear units. To satisfy such a requirement, the next generation of nuclear plants will include a great many design improvements that reflect the hundreds of years of operating experience that we have accrued. C-ESA's System 80+ will include a number of design changes that improve operating margins and make the plant easier to operate and maintain. Not surprisingly, there is a great deal of overlap between improved safety and improved reliability. In the end, our design will satisfy the future needs of the utilities, the regulators, and the public. C-E is very pleased that KAERI is working with US to achieve these important goals

  5. Reliability Analysis and Test Planning using CAPO-Test for Existing Structures

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Engelund, S.; Faber, Michael Havbro

    2000-01-01

    Evaluation of the reliability of existing concrete structures often requires that the compressive strength of the concrete is estimated on the basis of tests performed with concrete samples from the structure considered. In this paper the CAPO-test method is considered. The different sources...... of uncertainty related to this method are described. It is shown how the uncertainty in the transformation from the CAPO-test results to estimates of the concrete strength can be modeled. Further, the statistical uncertainty is modeled using Bayesian statistics. Finally, it is shown how reliability-based optimal...... planning of CAPO-tests can be performed taking into account the expected costs due to the CAPO-tests and possible repair or failure of the structure considered. An illustrative example is presented where the CAPO-test is compared with conventional concrete cylinder compression tests performed on cores...

  6. Reliability constrained generation expansion planning with consideration of wind farms uncertainties in deregulated electricity market

    International Nuclear Information System (INIS)

    Hemmati, Reza; Hooshmand, Rahmat-Allah; Khodabakhshian, Amin

    2013-01-01

    Highlights: • Generation expansion planning is presented in deregulated electricity market. • Wind farm uncertainty is modeled in the problem. • The profit of each GENCO is maximized and also the safe operation of system is satisfied. • Salve sector is managed as an optimization programming and solved by using PSO technique. • Master sector is considered in pool market and Cournot model is used to simulate it. - Abstract: This paper addresses reliability constrained generation expansion planning (GEP) in the presence of wind farm uncertainty in deregulated electricity market. The proposed GEP aims at maximizing the expected profit of all generation companies (GENCOs), while considering security and reliability constraints such as reserve margin and loss of load expectation (LOLE). Wind farm uncertainty is also considered in the planning and GENCOs denote their planning in the presence of wind farm uncertainty. The uncertainty is modeled by probability distribution function (PDF) and Monte-Carlo simulation (MCS) is used to insert uncertainty into the problem. The proposed GEP is a constrained, nonlinear, mixed-integer optimization programming and solved by using particle swarm optimization (PSO) method. In this paper, Electricity market structure is modeled as a pool market. Simulation results verify the effectiveness and validity of the proposed planning for maximizing GENCOs profit in the presence of wind farms uncertainties in electricity market

  7. A reliability as an independent variable (RAIV) methodology for optimizing test planning for liquid rocket engines

    Science.gov (United States)

    Strunz, Richard; Herrmann, Jeffrey W.

    2011-12-01

    The hot fire test strategy for liquid rocket engines has always been a concern of space industry and agency alike because no recognized standard exists. Previous hot fire test plans focused on the verification of performance requirements but did not explicitly include reliability as a dimensioning variable. The stakeholders are, however, concerned about a hot fire test strategy that balances reliability, schedule, and affordability. A multiple criteria test planning model is presented that provides a framework to optimize the hot fire test strategy with respect to stakeholder concerns. The Staged Combustion Rocket Engine Demonstrator, a program of the European Space Agency, is used as example to provide the quantitative answer to the claim that a reduced thrust scale demonstrator is cost beneficial for a subsequent flight engine development. Scalability aspects of major subsystems are considered in the prior information definition inside the Bayesian framework. The model is also applied to assess the impact of an increase of the demonstrated reliability level on schedule and affordability.

  8. 78 FR 69018 - Improving the Resiliency of Mobile Wireless Communications Networks; Reliability and Continuity...

    Science.gov (United States)

    2013-11-18

    ... consumers value overall network reliability and quality in selecting mobile wireless service providers, they...-125] Improving the Resiliency of Mobile Wireless Communications Networks; Reliability and Continuity... (Reliability NOI) in 2011 to ``initiate a comprehensive examination of issues regarding the reliability...

  9. Performance improvement plan in customer technical services

    International Nuclear Information System (INIS)

    Lachambre, L.

    1995-01-01

    This presentation centred around the philosophy, goals, and initiatives associated with Gaz Metropolitain's performance improvement plan. Various aspects of the plan including customer surveys, new customer service policies, the creation of small working units, the decentralization of the Montreal service department, and customer-harmonized shift schedules were explored. Implementation of new service plans and contracts, the formation of improvement groups related to human resources, human resource and productivity management, leadership training, and the use of performance indicators were also explained

  10. QA support for TFTR reliability improvement program in preparation for DT operation

    International Nuclear Information System (INIS)

    Parsells, R.F.; Howard, H.P.

    1987-01-01

    As TFTR approaches experiments in the Q=1 regime, machine reliability becomes a major variable in achieving experimental objectives. This paper describes the methods used to quantify current reliability levels, levels required for D-T operations, proposed methods for reliability growth and improvement, and tracking of reliability performance in that growth. Included in this scope are data collection techniques and short comings, bounding current reliability on the upper end, and requirements for D-T operations. Problem characterization through Pareto diagrams provides insight into recurrent failure modes and the use of Duane plots for charting of reliability changes both cumulative and instantaneous, is explained and demonstrated

  11. Airport Capital Improvement Planning: Stewardship for Airport Development

    Science.gov (United States)

    1997-09-01

    "Airport Capital Improvement Planning: Stewardship for Airport Development", was : originally written in October, 1995. It documented an effort to implement the : concept of capital improvement planning with the airport development industry. : Airpor...

  12. 78 FR 63036 - Transmission Planning Reliability Standards

    Science.gov (United States)

    2013-10-23

    ... Reliability Standards for the Bulk Power System, 130 FERC ] 61,200 (2010). \\8\\ Mandatory Reliability Standards... electric system operations across normal and contingency conditions. We also find that Reliability Standard... Reliability Standards for the Bulk Power System, 131 FERC ] 61,231 at P 21. Comments 24. NERC supports the...

  13. The experiences to improve plant performance and reliability of Ko-Ri nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Ho Weon [Korea Electric Power Corp. Ko-Ri nuclear power division, Ko-Ri (Korea, Republic of)

    1998-07-01

    This paper provides a discussion of the lessons learned from operational experience and the future plans to improve performance of the Ko-Ri plant. To operate nuclear power plants safely with good performance is the only way to mitigate the negative image of nuclear power generation to the public and to enhance the economical benefit compared to other electrical generation method. Therefore, in a continuous effort to overcome a negative challenge from outside, we have driven an aggressive 'OCTF' campaign as part of safety. As a result of our efforts, the following remarkable achievements have been accomplished. (1) 3 times of OCTF during recent three years (2) Selected twice as a top notch power plant on the list of NEI magazine in terms of plant capacity factor (3) No scram recorded in 1997 for all 4 units at Ko-Ri site. Ko-Ri is now undergoing the large scale plant betterment projects for retaking-off our operating performance to the level of new challenge target. Such improvement of critical components in the reactor coolant system and turbine system greatly contribute to increase the safety and reliability of the plant and to shortening of the planned outage period as well as to reduction of radiation exposure and radwaste. (Cho, G. S.). 5 tabs., 10 figs.

  14. Reliability of Multi-Category Rating Scales

    Science.gov (United States)

    Parker, Richard I.; Vannest, Kimberly J.; Davis, John L.

    2013-01-01

    The use of multi-category scales is increasing for the monitoring of IEP goals, classroom and school rules, and Behavior Improvement Plans (BIPs). Although they require greater inference than traditional data counting, little is known about the inter-rater reliability of these scales. This simulation study examined the performance of nine…

  15. Who plans for health improvement? SEA, HIA and the separation of spatial planning and health planning

    International Nuclear Information System (INIS)

    Bond, Alan; Cave, Ben; Ballantyne, Rob

    2013-01-01

    This study examines whether there is active planning for health improvement in the English spatial planning system and how this varies across two regions using a combination of telephone surveys and focus group interviews in 2005 and 2010. The spatial planning profession was found to be ill-equipped to consider the health and well-being implications of its actions, whilst health professionals are rarely engaged and have limited understanding and aspirations when it comes to influencing spatial planning. Strategic Environmental Assessment was not considered to be successful in integrating health into spatial plans, given it was the responsibility of planners lacking the capacity to do so. For their part, health professionals have insufficient knowledge and understanding of planning and how to engage with it to be able to plan for health gains rather than simply respond to health impacts. HIA practice is patchy and generally undertaken by health professionals outside the statutory planning framework. Thus, whilst appropriate assessment tools exist, they currently lack a coherent context within which they can function effectively and the implementation of the Kiev protocol requiring the engagement of health professionals in SEA is not to likely improve the consideration of health in planning while there continues to be separation of functions between professions and lack of understanding of the other profession. -- Highlights: ► Health professionals have limited aspirations for health improvement through the planning system. ► Spatial planners are ill-equipped to understand the health and well-being implications of their activities. ► SEA and HIA currently do not embed health consideration in planning decisions. ► The separation of health and planning functions is problematic for the effective conduct of SEA and/or HIA

  16. Who plans for health improvement? SEA, HIA and the separation of spatial planning and health planning

    Energy Technology Data Exchange (ETDEWEB)

    Bond, Alan, E-mail: alan.bond@uea.ac.uk [InteREAM (Interdisciplinary Research in Environmental Assessment and Management), School of Environmental Sciences, University of East Anglia, Norwich, NR4 7TJ (United Kingdom); Cave, Ben, E-mail: ben.cave@bcahealth.co.uk [Ben Cave Associates Ltd., Leeds (United Kingdom); Ballantyne, Rob, E-mail: robdballantyne@gmail.com [Planning and Health Consultant, Oxfordshire (United Kingdom)

    2013-09-15

    This study examines whether there is active planning for health improvement in the English spatial planning system and how this varies across two regions using a combination of telephone surveys and focus group interviews in 2005 and 2010. The spatial planning profession was found to be ill-equipped to consider the health and well-being implications of its actions, whilst health professionals are rarely engaged and have limited understanding and aspirations when it comes to influencing spatial planning. Strategic Environmental Assessment was not considered to be successful in integrating health into spatial plans, given it was the responsibility of planners lacking the capacity to do so. For their part, health professionals have insufficient knowledge and understanding of planning and how to engage with it to be able to plan for health gains rather than simply respond to health impacts. HIA practice is patchy and generally undertaken by health professionals outside the statutory planning framework. Thus, whilst appropriate assessment tools exist, they currently lack a coherent context within which they can function effectively and the implementation of the Kiev protocol requiring the engagement of health professionals in SEA is not to likely improve the consideration of health in planning while there continues to be separation of functions between professions and lack of understanding of the other profession. -- Highlights: ► Health professionals have limited aspirations for health improvement through the planning system. ► Spatial planners are ill-equipped to understand the health and well-being implications of their activities. ► SEA and HIA currently do not embed health consideration in planning decisions. ► The separation of health and planning functions is problematic for the effective conduct of SEA and/or HIA.

  17. 42 CFR 460.132 - Quality assessment and performance improvement plan.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Quality assessment and performance improvement plan... assessment and performance improvement plan. (a) Basic rule. A PACE organization must have a written quality assessment and performance improvement plan. (b) Annual review. The PACE governing body must review the plan...

  18. Reliability improvement through alternative designs-A case study

    International Nuclear Information System (INIS)

    Kumar, Saurabh; Chattopadhyay, Gopi; Kumar, Uday

    2007-01-01

    In today's competitive world, reliability of equipment is extremely important to maintain quality and delivery deadlines. This is achieved by using proper maintenance and design changes for unreliable subsystems and components of a complex system. It is significant to develop a strategy for maintenance, replacement and design changes related to those subsystems and components. An analysis of down time along with causes is essential to identify the unreliable components and subsystems. This paper presents an analysis of failure data of solenoid coils of automatic internal grinding machine used in a bearing manufacturing plant. It analyses various replacement and change of design options such as introduction of pneumatic system in place of electromagnetic solenoids for improvement of reliability of the plunger movement mechanism

  19. Improving inspection reliability through operator selection and training

    International Nuclear Information System (INIS)

    McGrath, Bernard; Carter, Luke

    2013-01-01

    A number of years ago the UK's Health and Safety Executive sponsored a series of three PANI projects investigating the application of manual ultrasonics, which endeavoured to establish the necessary steps that ensure a reliable inspection is performed. The results of the three projects were each reported separately on completion and also presented at number of international conferences. This paper summarises the results of these projects from the point of view of operator performance. The correlation of operator ultrasonic performance with results of aptitude tests is presented along with observations on the impact of training and qualifications of the operators. The results lead to conclusions on how the selection and training of operators could be modified to improve reliability of inspections.

  20. The Genesis of a Trauma Performance Improvement Plan.

    Science.gov (United States)

    Pidgeon, Kristopher

    2015-01-01

    The purpose of this article is to assist the trauma medical and program director with developing a performance improvement and patients safety plan (PIPS), which is a required component of a successful trauma verification process by the American College of Surgeons. This article will review trauma quality standards and will describe in detail the required elements of a successful trauma center's performance improvement plan including a written comprehensive plan that outlines the mission and vision of the PIPS Program, authority of the PIPS Program, PIPS Program Committee reporting structure to the other hospital committees, list of required PIPS multidisciplinary team members, the operational components of the utilized data management system (trauma registry), list of indicators/audit filters, levels of review, peer determinations, corrective action plan with implementation, event resolution, and reevaluation. Strategies to develop a successful trauma performance improvement plan are presented.

  1. Reliability analysis and risk-based methods for planning of operation & maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2017-01-01

    for extreme and fatigue limit states are presented. Operation & Maintenance planning often follows corrective and preventive strategies based on information from condition monitoring and structural health monitoring systems. A reliability- and risk-based approach is presented where a life-cycle approach...

  2. Training improves interobserver reliability for the diagnosis of scaphoid fracture displacement.

    Science.gov (United States)

    Buijze, Geert A; Guitton, Thierry G; van Dijk, C Niek; Ring, David

    2012-07-01

    The diagnosis of displacement in scaphoid fractures is notorious for poor interobserver reliability. We tested whether training can improve interobserver reliability and sensitivity, specificity, and accuracy for the diagnosis of scaphoid fracture displacement on radiographs and CT scans. Sixty-four orthopaedic surgeons rated a set of radiographs and CT scans of 10 displaced and 10 nondisplaced scaphoid fractures for the presence of displacement, using a web-based rating application. Before rating, observers were randomized to a training group (34 observers) and a nontraining group (30 observers). The training group received an online training module before the rating session, and the nontraining group did not. Interobserver reliability for training and nontraining was assessed by Siegel's multirater kappa and the Z-test was used to test for significance. There was a small, but significant difference in the interobserver reliability for displacement ratings in favor of the training group compared with the nontraining group. Ratings of radiographs and CT scans combined resulted in moderate agreement for both groups. The average sensitivity, specificity, and accuracy of diagnosing displacement of scaphoid fractures were, respectively, 83%, 85%, and 84% for the nontraining group and 87%, 86%, and 87% for the training group. Assuming a 5% prevalence of fracture displacement, the positive predictive value was 0.23 in the nontraining group and 0.25 in the training group. The negative predictive value was 0.99 in both groups. Our results suggest training can improve interobserver reliability and sensitivity, specificity and accuracy for the diagnosis of scaphoid fracture displacement, but the improvements are slight. These findings are encouraging for future research regarding interobserver variation and how to reduce it further.

  3. Reliability database development and plant performance improvement effort at Korea Hydro and Nuclear Power Co

    International Nuclear Information System (INIS)

    Oh, S. J.; Hwang, S. W.; Na, J. H.; Lim, H. S.

    2008-01-01

    Nuclear utilities in recent years have focused on improved plant performance and equipment reliability. In U.S., there is a movement toward process integration. Examples are INPO AP-913 equipment reliability program and the standard nuclear performance model developed by NEI. Synergistic effect from an integrated approach can be far greater than as compared to individual effects from each program. In Korea, PSA for all Korean NPPs (Nuclear Power Plants) has been completed. Plant performance monitoring and improvement is an important goal for KHNP (Korea Hydro and Nuclear Power Company) and a risk monitoring system called RIMS has been developed for all nuclear plants. KHNP is in the process of voluntarily implementing maintenance rule program similar to that in U.S. In the future, KHNP would like to expand the effort to equipment reliability program and to achieve highest equipment reliability and improved plant performance. For improving equipment reliability, the current trend is moving toward preventive/predictive maintenance from corrective maintenance. With the emphasis on preventive maintenance, the failure cause and operation history and environment are important. Hence, the development of accurate reliability database is necessary. Furthermore, the database should be updated regularly and maintained as a living program to reflect the current status of equipment reliability. This paper examines the development of reliability database system and its application of maintenance optimization or Risk Informed Application (RIA). (authors)

  4. Advanced reliability improvement of AC-modules (ARIA)

    International Nuclear Information System (INIS)

    Rooij, P.; Real, M.; Moschella, U.; Sample, T.; Kardolus, M.

    2001-09-01

    The AC-module is a relatively new development in PV-system technology and offers significant advantages over conventional PV-systems with a central inverter : e.g. increased modularity, ease of installation and freedom of system design. The Netherlands and Switzerland have a leading position in the field of AC-modules, both in terms of technology and of commercial and large-scale application. An obstacle towards large-scale market introduction of AC-modules is that the reliability and operational lifetime of AC-modules and the integrated inverters in particular are not yet proven. Despite the advantages, no module-integrated inverter has yet achieved large scale introduction. The AC-modules will lower the barrier towards market penetration. But due to the great interest in the new AC-module technology there is the risk of introducing a not fully proven product. This may damage the image of PV-systems. To speed up the development and to improve the reliability, research institutes and PV-industry will address the aspects of reliability and operational lifetime of AC-modules. From field experiences we learn that in general the inverter is still the weakest point in PV-systems. The lifetime of inverters is an important factor on reliability. Some authors are indicating a lifetime of 1.5 years, whereas the field experiences in Germany and Switzerland have shown that for central inverter systems, an availability of 97% has been achieved in the last years. From this point of view it is highly desirable that the operational lifetime and reliability of PV-inverters and especially AC-modules is demonstrated/improved to make large scale use of PV a success. Module Integrated Inverters will most likely be used in modules in the power range between 100 and 300 Watt DC-power. These are modules with more than 100 cells in series, assuming that the module inverter will benefit from the higher voltage. Hot-spot is the phenomenon that can occur when one or more cells of a string

  5. The 2000 DOD Financial Management Improvement Plan

    National Research Council Canada - National Science Library

    2001-01-01

    .... As a result, DoD has prepared the Financial Management Improvement Plan (the Plan), which is a strategic framework that includes the Departments financial management concept of operations for the future...

  6. Evaluation and improvement in nondestructive examination (NDE) reliability for inservice inspection of light water reactors

    International Nuclear Information System (INIS)

    Doctor, S.R.; Deffenbaugh, J.D.; Good, M.S.; Green, E.R.; Heasler, P.G.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T.

    1988-01-01

    The Evaluation and Improvement of NDE Reliability for Inservice Inspection of Light Water Reactors (NDE Reliability) program at the Pacific Northwest Laboratory was established by the NRC to determine the reliability of current inservice inspection (ISI) techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this program include determining the reliability of ISI performed on the primary systems of commercial light-water reactors (LWRs); using probabilistic fracture mechanics analysis to determine the impact of NDE unreliability on system safety; and evaluating reliability improvements that can be achieved with improved and advanced technology. A final objective is to formulate recommended revisions to ASME Code and Regulatory requirements, based on material properties, service conditions and NDE uncertainties. The program scope is limited to ISI of the primary systems including the piping, vessel, and other inspected components. This is a progress report covering the programmatic work from October 1986 through September 1987. (author)

  7. Evaluation and improvement in nondestructive examination (NDE) reliability for inservice inspection of light water reactors

    International Nuclear Information System (INIS)

    Doctor, S.R.; Deffenbaugh, J.D.; Good, M.S.; Green, E.R.; Heasler, P.G.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T.

    1988-01-01

    The Evaluation and Improvement of NDE Reliability for Inservice Inspection of Light Water Reactor (NDE Reliability) program at the Pacific Northwest Laboratory was established by the NRC to determine the reliability of current inservice inspection (ISI) techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this program include determining the reliability of ISI performed on the primary systems of commercial light-water reactors (LWRs); using probabilistic fracture mechanics analysis to determine the impact of NDE unreliability on system safety; and evaluating reliability improvements that can be achieved with improved and advanced technology. A final objective is to formulate recommended revisions to ASME Code and Regulatory requirements, based on material properties, service conditions, and NDE uncertainties. The program scope is limited to ISI of the primary systems including the piping, vessel, and other inspected components. This is a progress report covering the programmatic work from October 1986 through September 1987

  8. An accurate and efficient reliability-based design optimization using the second order reliability method and improved stability transformation method

    Science.gov (United States)

    Meng, Zeng; Yang, Dixiong; Zhou, Huanlin; Yu, Bo

    2018-05-01

    The first order reliability method has been extensively adopted for reliability-based design optimization (RBDO), but it shows inaccuracy in calculating the failure probability with highly nonlinear performance functions. Thus, the second order reliability method is required to evaluate the reliability accurately. However, its application for RBDO is quite challenge owing to the expensive computational cost incurred by the repeated reliability evaluation and Hessian calculation of probabilistic constraints. In this article, a new improved stability transformation method is proposed to search the most probable point efficiently, and the Hessian matrix is calculated by the symmetric rank-one update. The computational capability of the proposed method is illustrated and compared to the existing RBDO approaches through three mathematical and two engineering examples. The comparison results indicate that the proposed method is very efficient and accurate, providing an alternative tool for RBDO of engineering structures.

  9. 24 Command Fire Improvement Action Program Plan

    International Nuclear Information System (INIS)

    GRIFFIN, G.B.

    2000-01-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements

  10. Training less-experienced faculty improves reliability of skills assessment in cardiac surgery.

    Science.gov (United States)

    Lou, Xiaoying; Lee, Richard; Feins, Richard H; Enter, Daniel; Hicks, George L; Verrier, Edward D; Fann, James I

    2014-12-01

    Previous work has demonstrated high inter-rater reliability in the objective assessment of simulated anastomoses among experienced educators. We evaluated the inter-rater reliability of less-experienced educators and the impact of focused training with a video-embedded coronary anastomosis assessment tool. Nine less-experienced cardiothoracic surgery faculty members from different institutions evaluated 2 videos of simulated coronary anastomoses (1 by a medical student and 1 by a resident) at the Thoracic Surgery Directors Association Boot Camp. They then underwent a 30-minute training session using an assessment tool with embedded videos to anchor rating scores for 10 components of coronary artery anastomosis. Afterward, they evaluated 2 videos of a different student and resident performing the task. Components were scored on a 1 to 5 Likert scale, yielding an average composite score. Inter-rater reliabilities of component and composite scores were assessed using intraclass correlation coefficients (ICCs) and overall pass/fail ratings with kappa. All components of the assessment tool exhibited improvement in reliability, with 4 (bite, needle holder use, needle angles, and hand mechanics) improving the most from poor (ICC range, 0.09-0.48) to strong (ICC range, 0.80-0.90) agreement. After training, inter-rater reliabilities for composite scores improved from moderate (ICC, 0.76) to strong (ICC, 0.90) agreement, and for overall pass/fail ratings, from poor (kappa = 0.20) to moderate (kappa = 0.78) agreement. Focused, video-based anchor training facilitates greater inter-rater reliability in the objective assessment of simulated coronary anastomoses. Among raters with less teaching experience, such training may be needed before objective evaluation of technical skills. Published by Elsevier Inc.

  11. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999

  12. Reliability improvements on Thales RM2 rotary Stirling coolers: analysis and methodology

    Science.gov (United States)

    Cauquil, J. M.; Seguineau, C.; Martin, J.-Y.; Benschop, T.

    2016-05-01

    The cooled IR detectors are used in a wide range of applications. Most of the time, the cryocoolers are one of the components dimensioning the lifetime of the system. The cooler reliability is thus one of its most important parameters. This parameter has to increase to answer market needs. To do this, the data for identifying the weakest element determining cooler reliability has to be collected. Yet, data collection based on field are hardly usable due to lack of informations. A method for identifying the improvement in reliability has then to be set up which can be used even without field return. This paper will describe the method followed by Thales Cryogénie SAS to reach such a result. First, a database was built from extensive expertizes of RM2 failures occurring in accelerate ageing. Failure modes have then been identified and corrective actions achieved. Besides this, a hierarchical organization of the functions of the cooler has been done with regard to the potential increase of its efficiency. Specific changes have been introduced on the functions most likely to impact efficiency. The link between efficiency and reliability will be described in this paper. The work on the two axes - weak spots for cooler reliability and efficiency - permitted us to increase in a drastic way the MTTF of the RM2 cooler. Huge improvements in RM2 reliability are actually proven by both field return and reliability monitoring. These figures will be discussed in the paper.

  13. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Quality improvement plan (QIP... PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a.... (iii) Appropriate improvements to control methods. (iv) Other steps appropriate to correct control...

  14. Improved Reliability-Based Optimization with Support Vector Machines and Its Application in Aircraft Wing Design

    Directory of Open Access Journals (Sweden)

    Yu Wang

    2015-01-01

    Full Text Available A new reliability-based design optimization (RBDO method based on support vector machines (SVM and the Most Probable Point (MPP is proposed in this work. SVM is used to create a surrogate model of the limit-state function at the MPP with the gradient information in the reliability analysis. This guarantees that the surrogate model not only passes through the MPP but also is tangent to the limit-state function at the MPP. Then, importance sampling (IS is used to calculate the probability of failure based on the surrogate model. This treatment significantly improves the accuracy of reliability analysis. For RBDO, the Sequential Optimization and Reliability Assessment (SORA is employed as well, which decouples deterministic optimization from the reliability analysis. The improved SVM-based reliability analysis is used to amend the error from linear approximation for limit-state function in SORA. A mathematical example and a simplified aircraft wing design demonstrate that the improved SVM-based reliability analysis is more accurate than FORM and needs less training points than the Monte Carlo simulation and that the proposed optimization strategy is efficient.

  15. Improving QST Reliability – More Raters, Tests or Occasions? A Multivariate Generalizability Study

    DEFF Research Database (Denmark)

    O'Neill, Søren; O'Neill, Lotte

    2015-01-01

    The reliability of quantitative sensory testing (QST) is affected by the error attributable to both test occasion and rater (examiner) as well as interactions between them. Most reliability studies only account for one source of error. The present study employed a fully-crossed, multivariate...... threshold, intensity, tolerance and modulation with mechanical, thermal and chemical stimuli. The classical test-retest and inter-rater reliability (0.19... procedures. Reliability was improved more by repeated testing on separate occasions opposed to repeated testing by different raters....

  16. Reliability improvement methods for sapphire fiber temperature sensors

    Science.gov (United States)

    Schietinger, C.; Adams, B.

    1991-08-01

    Mechanical, optical, electrical, and software design improvements can be brought to bear in the enhancement of fiber-optic sapphire-fiber temperature measurement tool reliability in harsh environments. The optical fiber thermometry (OFT) equipment discussed is used in numerous process industries and generally involves a sapphire sensor, an optical transmission cable, and a microprocessor-based signal analyzer. OFT technology incorporating sensors for corrosive environments, hybrid sensors, and two-wavelength measurements, are discussed.

  17. Interobserver and Intraobserver Reliability of Three-Dimensional Preoperative Planning Software in Total Hip Arthroplasty.

    Science.gov (United States)

    Wako, Yasushi; Nakamura, Junichi; Miura, Michiaki; Kawarai, Yuya; Sugano, Masahiko; Nawata, Kento

    2018-02-01

    The purpose of this study is to clarify interobserver and intraobserver reliabilities of the three-dimensional (3D) templating of total hip arthroplasty (THA). We selected preoperative computed tomography from 60 hips in 46 patients (14 men and 32 women) who underwent primary THA. To evaluate interobserver and intraobserver reliability, 6 orthopedic surgeons performed 3D templating twice over a 4-week interval. We investigated intraclass correlation coefficients (ICCs) and percent agreement of component size and alignment, comparing morphological differences in the hip. Reproducibility was also compared between groups with osteoarthritis (OA) and those with osteonecrosis (ON). The interobserver reliabilities for mean cup size and stem size were excellent, with ICC = 0.907 and 0.944, respectively. The value was significantly higher in the ON group than in the OA group. In the OA group, the reliability of cup size and alignment decreased in hips with severe subluxation. Percent agreement of stem size was significantly different between the shapes of femoral canal. For intraobserver reliability, the mean ICC of cup size was 0.965 overall, while the value in the ON group was significantly higher than in the OA group. The mean ICC of stem size was 0.972 overall. Computed tomography-based 3D templating showed excellent reliability for component size and alignment in THA. Deformity of the affected joint influenced the reliability of preoperative planning. Copyright © 2017 Elsevier Inc. All rights reserved.

  18. Improving risk assessment by defining consistent and reliable system scenarios

    Directory of Open Access Journals (Sweden)

    B. Mazzorana

    2009-02-01

    Full Text Available During the entire procedure of risk assessment for hydrologic hazards, the selection of consistent and reliable scenarios, constructed in a strictly systematic way, is fundamental for the quality and reproducibility of the results. However, subjective assumptions on relevant impact variables such as sediment transport intensity on the system loading side and weak point response mechanisms repeatedly cause biases in the results, and consequently affect transparency and required quality standards. Furthermore, the system response of mitigation measures to extreme event loadings represents another key variable in hazard assessment, as well as the integral risk management including intervention planning. Formative Scenario Analysis, as a supplement to conventional risk assessment methods, is a technique to construct well-defined sets of assumptions to gain insight into a specific case and the potential system behaviour. By two case studies, carried out (1 to analyse sediment transport dynamics in a torrent section equipped with control measures, and (2 to identify hazards induced by woody debris transport at hydraulic weak points, the applicability of the Formative Scenario Analysis technique is presented. It is argued that during scenario planning in general and with respect to integral risk management in particular, Formative Scenario Analysis allows for the development of reliable and reproducible scenarios in order to design more specifically an application framework for the sustainable assessment of natural hazards impact. The overall aim is to optimise the hazard mapping and zoning procedure by methodologically integrating quantitative and qualitative knowledge.

  19. SLAC modulator system improvements and reliability results

    International Nuclear Information System (INIS)

    Donaldson, A.R.

    1998-06-01

    In 1995, an improvement project was completed on the 244 klystron modulators in the linear accelerator. The modulator system has been previously described. This article offers project details and their resulting effect on modulator and component reliability. Prior to the project, the authors had collected four operating cycles (1991 through 1995) of MTTF data. In this discussion, the '91 data will be excluded since the modulators operated at 60 Hz. The five periods following the '91 run were reviewed due to the common repetition rate at 120 Hz

  20. Reliability Evaluation and Improvement Approach of Chemical Production Man - Machine - Environment System

    Science.gov (United States)

    Miao, Yongchun; Kang, Rongxue; Chen, Xuefeng

    2017-12-01

    In recent years, with the gradual extension of reliability research, the study of production system reliability has become the hot topic in various industries. Man-machine-environment system is a complex system composed of human factors, machinery equipment and environment. The reliability of individual factor must be analyzed in order to gradually transit to the research of three-factor reliability. Meanwhile, the dynamic relationship among man-machine-environment should be considered to establish an effective blurry evaluation mechanism to truly and effectively analyze the reliability of such systems. In this paper, based on the system engineering, fuzzy theory, reliability theory, human error, environmental impact and machinery equipment failure theory, the reliabilities of human factor, machinery equipment and environment of some chemical production system were studied by the method of fuzzy evaluation. At last, the reliability of man-machine-environment system was calculated to obtain the weighted result, which indicated that the reliability value of this chemical production system was 86.29. Through the given evaluation domain it can be seen that the reliability of man-machine-environment integrated system is in a good status, and the effective measures for further improvement were proposed according to the fuzzy calculation results.

  1. Integrating Planning, Assessment, and Improvement in Higher Education

    Science.gov (United States)

    Sherlock, Barbara J.

    2009-01-01

    Based on Penn State's popular "Innovation Insights" series, this book brings together in one handy reference nearly a decade of tried and true insights into continuous quality improvements in higher education. Their five-step model for integrating planning, assessment, and improvement moves plans off the shelf and into the weekly and daily…

  2. MANAGEMENT PLANS AND THEIR IMPACT ON SCHOOL IMPROVEMENT

    Directory of Open Access Journals (Sweden)

    Ignacio Polo Martínez

    2016-06-01

    Full Text Available OECD (2015 states that management's leadership is a critical factor for implementing reforms and improving schools. Candidates are required to submit a management plan outlining the framework of a plan to be followed during their 4 year term. Despite the plan outlined in the proposal, the implicit "non aggression pact" between the participants (the teachers and the directors, who are teachers themselves, makes change difficult. As a result, management plans have little impact on improving methods of teaching and academic results achieved by the students. In this article we have tried to achieve three objectives: 1 analyze the relationship between the renewal, selection and appointment of a director with the management plan around our country, 2 analyze which aspects are those that, according to major international studies, should determine the content, development and evaluation of a management plan, and 3 to suggest how one could implement a management plan for an education center or school.

  3. Risk and reliability allocation to risk control

    International Nuclear Information System (INIS)

    Vojnovic, D.; Kozuh, M.

    1992-01-01

    The risk allocation procedure is used as an analytical model to support the optimal decision making for reliability/availability improvement planning. Both levels of decision criteria, the plant risk measures and plant performance indices, are used in risk allocation procedure. Decision support system uses the multi objective decision making concept. (author) [sl

  4. Improvement of Equipment reliability for Auxiliary Feed Water System

    Energy Technology Data Exchange (ETDEWEB)

    Deok, Lee Sang; Kwan, Lee Yong [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    According to AP913 ER) of INPO, Number of the event related to equipment is higher than others like external or human performance. In the top 25 systems, Auxiliary feed water system is the seventh highest among systems. AWFS consists of many component and complex system and Main Function of AFWS is to supply feedwater to the steam generators for the removal of heat from the RCS(Reactor Coolant System) in event the main feedwater system is unavailable following a transient or accident. Reliability of component means how well operate on demands and monitoring is necessary to keep track of condition of component. If component performance is lower than the required value, corrective action for failure mode should be done. The objective of this study is focused to improve of AF pump by adding the tasks of SHR(System Health Report) into the task of system engineer walkdown of PMT(Preventive Maintenance Template). Increasing the reliability of AF pump will contribute to improvement of reliability of AFWS. Based on operating history, there was high vibration of AF pump during performance test. In that case, there were a lot of maintenance works for normal operation of AF pump. Vibration problem related pump can't be detected by tasks of SE walkdown because it's not running during normal operation except for surveillance test. CHR(Component Health Report) of AF pump in AFWS can be made from necessary part which means monitoring and functional failure because problem of Stand-by pump can be covered by conducting monitoring and analysis of functional failure. To improve reliability of AF pump, walkdown of PMT and SHR should be conducted both in accordance with surveillance test frequency. Health of AF pump based on operation history can be verified first and then can find out which parts of pump are weak. Finally, weak part can be managed intensively and failure can be reduced according to SE walkdown. But this work can be risky and burdensome because all parts of

  5. NCTPlan. The new PC version of MacNCTPlan improvements and validation of the treatment planning system

    International Nuclear Information System (INIS)

    Gonzalez, S.J.; Santa Cruz, Gustavo A.; Yam, C.S.

    2003-01-01

    Full text: The treatment planning system that has been used routinely in phase-I clinical trials of BNCT at Harvard/MIT consists of the MacNCTPlan interactive planning software coupled to the MCNP 4B Monte Carlo radiation transport code. The physical and mathematical principles of MacNCTPlan as well as its architecture, operation and application have been previously described elsewhere. The use of this software in clinical trials together with a detailed analysis of the code led to the identification of some limitations and deficiencies. The motivation for this PC version, Neutron Capture Therapy Planning, relies basically in two major reasons: the need to integrate the different steps for making a plan and the need to improve some features of the Macintosh version. NCTPlan aims to reproduce all the features and capabilities present in the Macintosh version. Working on this, some deficiencies were corrected and several changes in the interface were performed in order to provide a more friendly and reliable program. Among the changes intended to facilitate the treatment planning process, the most important are the integration of the auxiliary program MPREP to NCTPlan and a great improvement in the visualization of isodose contours. NCTPlan has the ability to show the isodose distributions superimposed on two orthogonal planes of the CT volume, these planes being updated in real time as the orientation of the planes is changed. The major modifications to the mathematical algorithms concerned the material assignment in the geometric model, dose distribution calculations and three-dimensional dose-volume histogram (DVH) derivation. Therefore, NCTPlan provides a user-friendly interface thanks to the integration of the different steps involved in treatment planning. Complete control of the MCNP radiation transport code is under study. Cross-validation of NCTPlan against reference calculations made apparent the improvements performed on the mathematical algorithms

  6. Reliability engineering for nuclear and other high technology systems

    International Nuclear Information System (INIS)

    Lakner, A.A.; Anderson, R.T.

    1985-01-01

    This book is written for the reliability instructor, program manager, system engineer, design engineer, reliability engineer, nuclear regulator, probability risk assessment (PRA) analyst, general manager and others who are involved in system hardware acquisition, design and operation and are concerned with plant safety and operational cost-effectiveness. It provides criteria, guidelines and comprehensive engineering data affecting reliability; it covers the key aspects of system reliability as it relates to conceptual planning, cost tradeoff decisions, specification, contractor selection, design, test and plant acceptance and operation. It treats reliability as an integrated methodology, explicitly describing life cycle management techniques as well as the basic elements of a total hardware development program, including: reliability parameters and design improvement attributes, reliability testing, reliability engineering and control. It describes how these elements can be defined during procurement, and implemented during design and development to yield reliable equipment. (author)

  7. 76 FR 23801 - North American Electric Reliability Corporation; Order Approving Reliability Standard

    Science.gov (United States)

    2011-04-28

    ... have an operating plan and facilities for backup functionality to ensure Bulk-Power System reliability... entity's primary control center on the reliability of the Bulk-Power System. \\1\\ Mandatory Reliability... potential impact of a violation of the Requirement on the reliability of the Bulk-Power System. The...

  8. Reliability improvement in GaN HEMT power device using a field plate approach

    Science.gov (United States)

    Wu, Wen-Hao; Lin, Yueh-Chin; Chin, Ping-Chieh; Hsu, Chia-Chieh; Lee, Jin-Hwa; Liu, Shih-Chien; Maa, Jer-shen; Iwai, Hiroshi; Chang, Edward Yi; Hsu, Heng-Tung

    2017-07-01

    This study investigates the effect of implementing a field plate on a GaN high-electron-mobility transistor (HEMT) to improve power device reliability. The results indicate that the field plate structure reduces the peak electrical field and interface traps in the device, resulting in higher breakdown voltage, lower leakage current, smaller current collapse, and better threshold voltage control. Furthermore, after high voltage stress, steady dynamic on-resistance and gate capacitance degradation improvement were observed for the device with the field plate. This demonstrates that GaN device reliability can be improved by using the field plate approach.

  9. Precision of lumbar intervertebral measurements: does a computer-assisted technique improve reliability?

    Science.gov (United States)

    Pearson, Adam M; Spratt, Kevin F; Genuario, James; McGough, William; Kosman, Katherine; Lurie, Jon; Sengupta, Dilip K

    2011-04-01

    Comparison of intra- and interobserver reliability of digitized manual and computer-assisted intervertebral motion measurements and classification of "instability." To determine if computer-assisted measurement of lumbar intervertebral motion on flexion-extension radiographs improves reliability compared with digitized manual measurements. Many studies have questioned the reliability of manual intervertebral measurements, although few have compared the reliability of computer-assisted and manual measurements on lumbar flexion-extension radiographs. Intervertebral rotation, anterior-posterior (AP) translation, and change in anterior and posterior disc height were measured with a digitized manual technique by three physicians and by three other observers using computer-assisted quantitative motion analysis (QMA) software. Each observer measured 30 sets of digital flexion-extension radiographs (L1-S1) twice. Shrout-Fleiss intraclass correlation coefficients for intra- and interobserver reliabilities were computed. The stability of each level was also classified (instability defined as >4 mm AP translation or 10° rotation), and the intra- and interobserver reliabilities of the two methods were compared using adjusted percent agreement (APA). Intraobserver reliability intraclass correlation coefficients were substantially higher for the QMA technique THAN the digitized manual technique across all measurements: rotation 0.997 versus 0.870, AP translation 0.959 versus 0.557, change in anterior disc height 0.962 versus 0.770, and change in posterior disc height 0.951 versus 0.283. The same pattern was observed for interobserver reliability (rotation 0.962 vs. 0.693, AP translation 0.862 vs. 0.151, change in anterior disc height 0.862 vs. 0.373, and change in posterior disc height 0.730 vs. 0.300). The QMA technique was also more reliable for the classification of "instability." Intraobserver APAs ranged from 87 to 97% for QMA versus 60% to 73% for digitized manual

  10. Grant Peer Review: Improving Inter-Rater Reliability with Training.

    Science.gov (United States)

    Sattler, David N; McKnight, Patrick E; Naney, Linda; Mathis, Randy

    2015-01-01

    This study developed and evaluated a brief training program for grant reviewers that aimed to increase inter-rater reliability, rating scale knowledge, and effort to read the grant review criteria. Enhancing reviewer training may improve the reliability and accuracy of research grant proposal scoring and funding recommendations. Seventy-five Public Health professors from U.S. research universities watched the training video we produced and assigned scores to the National Institutes of Health scoring criteria proposal summary descriptions. For both novice and experienced reviewers, the training video increased scoring accuracy (the percentage of scores that reflect the true rating scale values), inter-rater reliability, and the amount of time reading the review criteria compared to the no video condition. The increase in reliability for experienced reviewers is notable because it is commonly assumed that reviewers--especially those with experience--have good understanding of the grant review rating scale. The findings suggest that both experienced and novice reviewers who had not received the type of training developed in this study may not have appropriate understanding of the definitions and meaning for each value of the rating scale and that experienced reviewers may overestimate their knowledge of the rating scale. The results underscore the benefits of and need for specialized peer reviewer training.

  11. 76 FR 73608 - Reliability Technical Conference, North American Electric Reliability Corporation, Public Service...

    Science.gov (United States)

    2011-11-29

    ... or municipal authority play in forming your bulk power system reliability plans? b. Do you support..., North American Electric Reliability Corporation (NERC) Nick Akins, CEO of American Electric Power (AEP..., EL11-62-000] Reliability Technical Conference, North American Electric Reliability Corporation, Public...

  12. Composite reliability evaluation for transmission network planning

    Directory of Open Access Journals (Sweden)

    Jiashen Teh

    2018-01-01

    Full Text Available As the penetration of wind power into the power system increases, the ability to assess the reliability impact of such interaction becomes more important. The composite reliability evaluations involving wind energy provide ample opportunities for assessing the benefits of different wind farm connection points. A connection to the weak area of the transmission network will require network reinforcement for absorbing the additional wind energy. Traditionally, the reinforcements are performed by constructing new transmission corridors. However, a new state-of-art technology such as the dynamic thermal rating (DTR system, provides new reinforcement strategy and this requires new reliability assessment method. This paper demonstrates a methodology for assessing the cost and the reliability of network reinforcement strategies by considering the DTR systems when large scale wind farms are connected to the existing power network. Sequential Monte Carlo simulations were performed and all DTRs and wind speed were simulated using the auto-regressive moving average (ARMA model. Various reinforcement strategies were assessed from their cost and reliability aspects. Practical industrial standards are used as guidelines when assessing costs. Due to this, the proposed methodology in this paper is able to determine the optimal reinforcement strategies when both the cost and reliability requirements are considered.

  13. Puget Sound area electric reliability plan: Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin

  14. Reliability and Robustness Analysis of the Masinga Dam under Uncertainty

    Directory of Open Access Journals (Sweden)

    Hayden Postle-Floyd

    2017-02-01

    Full Text Available Kenya’s water abstraction must meet the projected growth in municipal and irrigation demand by the end of 2030 in order to achieve the country’s industrial and economic development plan. The Masinga dam, on the Tana River, is the key to meeting this goal to satisfy the growing demands whilst also continuing to provide hydroelectric power generation. This study quantitatively assesses the reliability and robustness of the Masinga dam system under uncertain future supply and demand using probabilistic climate and population projections, and examines how long-term planning may improve the longevity of the dam. River flow and demand projections are used alongside each other as inputs to the dam system simulation model linked to an optimisation engine to maximise water availability. Water availability after demand satisfaction is assessed for future years, and the projected reliability of the system is calculated for selected years. The analysis shows that maximising power generation on a short-term year-by-year basis achieves 80%, 50% and 1% reliability by 2020, 2025 and 2030 onwards, respectively. Longer term optimal planning, however, has increased system reliability to up to 95% in 2020, 80% in 2025, and more than 40% in 2030 onwards. In addition, increasing the capacity of the reservoir by around 25% can significantly improve the robustness of the system for all future time periods. This study provides a platform for analysing the implication of different planning and management of Masinga dam and suggests that careful consideration should be given to account for growing municipal needs and irrigation schemes in both the immediate and the associated Tana River basin.

  15. Piping reliability improvement through passive seismic supports

    International Nuclear Information System (INIS)

    Baltus, R.; Rubbers, A.

    1999-01-01

    The nuclear plants designed in the 1970's were equipped with large quantities of snubbers in auxiliary piping systems. The experience revealed a poor performance of snubbers during periodic inspection, while non-nuclear facility piping survived through strong earthquakes. Consequently, seismic design rules evolved towards more realistic criteria and passive dynamic supports were developed to reduce snubber quantities. These solutions improve the pipe reliability during normal operation while reducing the radiation exposure in a sample line is presented with the impact on pipe stresses compared to the results obtained with passive supports named Limit Stops. (author)

  16. Improvement of the financial planning on a railway transport

    OpenAIRE

    Bogomolova, N.; Kravchenko, O.

    2011-01-01

    In the article are considered approaches to the determination of financial planning, are chose defects of ukrainian financial planning system, is conducted analysis of financial planning and budgeting, are offered directions to improvement of financial planning in railroad transport.

  17. Operational experience, availability and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Kueffer, K.

    1980-01-01

    This lecture - presents a survey on nuclear power production and plant performance in the Western World covering all reactor types and light-water reactors in particular and discusses key parameters such as load factors and non-availability analysis. - outlines the main reasons for the reliable performance of Swiss nuclear power plants - quality equipment - operator qualification and training - engineering know how on site - maintenance philosophy and outage planning - information system and feedback of experience - explains the management functions as applied at the Beznau Nuclear Power Station to ensure high power productivity and reliability - improvement - a feedback control system - analysis of production losses - optimization in shut-down planning - minimizing disturbances during plant operation - optimizing personnel qualification and efficiency. (orig.)

  18. 76 FR 1592 - National Poultry Improvement Plan; General Conference Committee Meeting

    Science.gov (United States)

    2011-01-11

    ...] National Poultry Improvement Plan; General Conference Committee Meeting AGENCY: Animal and Plant Health... General Conference Committee of the National Poultry Improvement Plan. DATES: The General Conference... Improvement Plan, VS, APHIS, 1498 Klondike Road, Suite 101, Conyers, GA 30094-5104; (770) 922-3496...

  19. Reliability Estimation Based Upon Test Plan Results

    National Research Council Canada - National Science Library

    Read, Robert

    1997-01-01

    The report contains a brief summary of aspects of the Maximus reliability point and interval estimation technique as it has been applied to the reliability of a device whose surveillance tests contain...

  20. Reliability and safety program plan outline for the operational phase of a waste isolation facility

    International Nuclear Information System (INIS)

    Ammer, H.G.; Wood, D.E.

    1977-01-01

    A Reliability and Safety Program plan outline has been prepared for the operational phase of a Waste Isolation Facility. The program includes major functions of risk assessment, technical support activities, quality assurance, operational safety, configuration monitoring, reliability analysis and support and coordination meetings. Detailed activity or task descriptions are included for each function. Activities are time-phased and presented in the PERT format for scheduling and interactions. Task descriptions include manloading, travel, and computer time estimates to provide data for future costing. The program outlined here will be used to provide guidance from a reliability and safety standpoint to design, procurement, construction, and operation of repositories for nuclear waste. These repositories are to be constructed under the National Waste Terminal Storage program under the direction of the Office of Waste Isolation, Union Carbide Corp. Nuclear Division

  1. Improving the Test-Retest Reliability of Resting State fMRI by Removing the Impact of Sleep.

    Science.gov (United States)

    Wang, Jiahui; Han, Junwei; Nguyen, Vinh T; Guo, Lei; Guo, Christine C

    2017-01-01

    Resting state functional magnetic resonance imaging (rs-fMRI) provides a powerful tool to examine large-scale neural networks in the human brain and their disturbances in neuropsychiatric disorders. Thanks to its low demand and high tolerance, resting state paradigms can be easily acquired from clinical population. However, due to the unconstrained nature, resting state paradigm is associated with excessive head movement and proneness to sleep. Consequently, the test-retest reliability of rs-fMRI measures is moderate at best, falling short of widespread use in the clinic. Here, we characterized the effect of sleep on the test-retest reliability of rs-fMRI. Using measures of heart rate variability (HRV) derived from simultaneous electrocardiogram (ECG) recording, we identified portions of fMRI data when subjects were more alert or sleepy, and examined their effects on the test-retest reliability of functional connectivity measures. When volumes of sleep were excluded, the reliability of rs-fMRI is significantly improved, and the improvement appears to be general across brain networks. The amount of improvement is robust with the removal of as much as 60% volumes of sleepiness. Therefore, test-retest reliability of rs-fMRI is affected by sleep and could be improved by excluding volumes of sleepiness as indexed by HRV. Our results suggest a novel and practical method to improve test-retest reliability of rs-fMRI measures.

  2. Accelerated reliability demonstration under competing failure modes

    International Nuclear Information System (INIS)

    Luo, Wei; Zhang, Chun-hua; Chen, Xun; Tan, Yuan-yuan

    2015-01-01

    The conventional reliability demonstration tests are difficult to apply to products with competing failure modes due to the complexity of the lifetime models. This paper develops a testing methodology based on the reliability target allocation for reliability demonstration under competing failure modes at accelerated conditions. The specified reliability at mission time and the risk caused by sampling of the reliability target for products are allocated for each failure mode. The risk caused by degradation measurement fitting of the target for a product involving performance degradation is equally allocated to each degradation failure mode. According to the allocated targets, the accelerated life reliability demonstration test (ALRDT) plans for the failure modes are designed. The accelerated degradation reliability demonstration test plans and the associated ALRDT plans for the degradation failure modes are also designed. Next, the test plan and the decision rules for the products are designed. Additionally, the effects of the discreteness of sample size and accepted number of failures for failure modes on the actual risks caused by sampling for the products are investigated. - Highlights: • Accelerated reliability demonstration under competing failure modes is studied. • The method is based on the reliability target allocation involving the risks. • The test plan for the products is based on the plans for all the failure modes. • Both failure mode and degradation failure modes are considered. • The error of actual risks caused by sampling for the products is small enough

  3. Zero tolerance for failure. An AREVA initiative to improve reliability

    International Nuclear Information System (INIS)

    Lippert, Hans-Joachim; Gentet, Guy; Mollard, Pierre; Garner, Norman

    2010-01-01

    Significant improvements in fuel reliability have been realized over the past 2 decades, but total elimination of failures has remained elusive. Driving reliability to higher levels requires a philosophy that does not accept that even infrequent and isolated failures are inevitable - it was on this foundation that Areva's Zero Tolerance for Failure (ZTF) initiative was established. This is not in itself either a program or project, but a fundamental shift in the way of thinking about work according to the following four principles: - Failures are avoidable, - Zero failures are our goal, - We will respond rapidly to any failure, - We succeed when we fix failures in a way that precludes recurrence. The shift to a ZTF philosophy is a broad change in corporate culture that expands the concept of failure far beyond cases where fuel rod cladding integrity is breached. While this paper specifically illustrates the ways in which ZTF has shaped the company's response to enhancing fuel rod reliability, ZTF extends to any failures of fuel products to deliver expected levels of performance, manufacturing processes to meet specifications and high first-pass acceptance criteria, and beyond to error-free performance of engineering analyses and cycle design and licensing services. Application of ZTF to enhancing fuel reliability deploys efforts in the areas of manufacturing, human factors, design, R and D, processes and product strategy. In order to achieve the necessary improvements, a number of important actions have been initiated across regions and facilities. In addition to these global scale projects and measures, each region contributes by adopting measures which are relevant to its particular activities and market needs. (orig.)

  4. Improving Metrological Reliability of Information-Measuring Systems Using Mathematical Modeling of Their Metrological Characteristics

    Science.gov (United States)

    Kurnosov, R. Yu; Chernyshova, T. I.; Chernyshov, V. N.

    2018-05-01

    The algorithms for improving the metrological reliability of analogue blocks of measuring channels and information-measuring systems are developed. The proposed algorithms ensure the optimum values of their metrological reliability indices for a given analogue circuit block solution.

  5. Validity and reliability analysis of the planned behavior theory scale related to the testicular self-examination in a Turkish context.

    Science.gov (United States)

    Iyigun, Emine; Tastan, Sevinc; Ayhan, Hatice; Kose, Gulsah; Acikel, Cengizhan

    2016-06-01

    This study aimed to determine the validity and reliability levels of the Planned Behavior Theory Scale as related to a testicular self-examination. The study was carried out in a health-profession higher-education school in Ankara, Turkey, from April to June 2012. The study participants comprised 215 male students. Study data were collected by using a questionnaire, a planned behavior theory scale related to testicular self-examination, and Champion's Health Belief Model Scale (CHBMS). The sub-dimensions of the planned behavior theory scale, namely those of intention, attitude, subjective norms and self-efficacy, were found to have Cronbach's alpha values of between 0.81 and 0.89. Exploratory factor analysis showed that items of the scale had five factors that accounted for 75% of the variance. Of these, the sub-dimension of intention was found to have the highest level of contribution. A significant correlation was found between the sub-dimensions of the testicular self-examination planned behavior theory scale and those of CHBMS (p Planned Behavior Theory Scale is a valid and reliable measurement for Turkish society.

  6. Device Performance and Reliability Improvements of AlGaBN/GaN/Si MOSFET

    Science.gov (United States)

    2016-02-04

    AFRL-AFOSR-JP-TR-2016-0037 Device Performance and Reliablity Improvements of AlGaBN/GaN/Si MOSFET Robert Wallace UNIVERSITY OF TEXAS AT DALLAS Final...GaN/Si MOSFET 5a.  CONTRACT NUMBER 5b.  GRANT NUMBER FA2386-14-1-4069 5c.  PROGRAM ELEMENT NUMBER 61102F 6. AUTHOR(S) Robert Wallace 5d.  PROJECT...AOARD Grant FA2386-14-1-4069 Device Performance and Reliability Improvements of AlGaN/GaN/Si MOSFET US 12 month extension (2014 – 2015) for current

  7. Reliability of the imaging software in the preoperative planning of the open-wedge high tibial osteotomy.

    Science.gov (United States)

    Lee, Yong Seuk; Kim, Min Kyu; Byun, Hae Won; Kim, Sang Bum; Kim, Jin Goo

    2015-03-01

    The purpose of this study was to verify a recently developed picture-archiving and communications system-photoshop method by comparing reliabilities between real-size paper template and the PACS-photoshop methods in preoperative planning of open-wedge high tibial osteotomy. A prospective case series was conducted, including patients with medial osteoarthritis undergoing open-wedge high tibial osteotomy. In the preoperative planning, the picture-archiving and communications system-photoshop method and real-size paper template method were used simultaneously in all patients. Preoperative hip-knee-ankle angle, height, and angle of the osteotomy were evaluated. The reliability of this newly devised method was evaluated, and the consistency between the two methods was also evaluated using intra-class correlation coefficient. Using the picture-archiving and communications system-photoshop method, the mean correction angle and height of osteotomy gap of rater-1 were 11.7° ± 3.6° and 10.7 ± 3.6 mm, respectively. The mean correction angle and height of osteotomy gap of rater-2 were 12.0 ± 2.6 and 10.8 ± 3.6, respectively. The inter- and intra-rater reliabilities of the correction angle were 0.956 ~ 0.979 and 0.980 ~ 0.992, respectively. The inter- and intra-rater reliabilities of the height of the osteotomy gap were 0.968 ~ 0.985 and 0.971 ~ 0.994, respectively (p photoshop method, mean values of the correction angle and height of the osteotomy gap were 11.9° ± 3.6° and 10.8 ± 3.6 mm, respectively. Consistency between the two methods by comparing the means of the correction angle and the height of the osteotomy gap were 0.985 and 0.985, respectively (p photoshop method enables direct measurement of the height of the osteotomy gap with high reliability.

  8. Goals and experience of performance improvement

    Energy Technology Data Exchange (ETDEWEB)

    Tan, H. [CNNO, CNNP, Nuclear Power Operations Management Co., Ltd. (China)

    2015-07-01

    Performance improvement was achieved by reasonable arrangement of planned window for related work and optimization of time for important maintenance items, outage quality and duration. Unplanned output loss has been reduced through routine unit management and improvements to both personnel skill and equipment reliability. Planned power generation loss is reduced by controlling planned duration and quality of forced shutdowns and outages, to ensure safe and stable plant operation.

  9. Improving the Test-Retest Reliability of Resting State fMRI by Removing the Impact of Sleep

    Directory of Open Access Journals (Sweden)

    Jiahui Wang

    2017-05-01

    Full Text Available Resting state functional magnetic resonance imaging (rs-fMRI provides a powerful tool to examine large-scale neural networks in the human brain and their disturbances in neuropsychiatric disorders. Thanks to its low demand and high tolerance, resting state paradigms can be easily acquired from clinical population. However, due to the unconstrained nature, resting state paradigm is associated with excessive head movement and proneness to sleep. Consequently, the test-retest reliability of rs-fMRI measures is moderate at best, falling short of widespread use in the clinic. Here, we characterized the effect of sleep on the test-retest reliability of rs-fMRI. Using measures of heart rate variability (HRV derived from simultaneous electrocardiogram (ECG recording, we identified portions of fMRI data when subjects were more alert or sleepy, and examined their effects on the test-retest reliability of functional connectivity measures. When volumes of sleep were excluded, the reliability of rs-fMRI is significantly improved, and the improvement appears to be general across brain networks. The amount of improvement is robust with the removal of as much as 60% volumes of sleepiness. Therefore, test-retest reliability of rs-fMRI is affected by sleep and could be improved by excluding volumes of sleepiness as indexed by HRV. Our results suggest a novel and practical method to improve test-retest reliability of rs-fMRI measures.

  10. Reliability benefits of dispersed wind resource development

    International Nuclear Information System (INIS)

    Milligan, M.; Artig, R.

    1998-05-01

    Generating capacity that is available during the utility peak period is worth more than off-peak capacity. Wind power from a single location might not be available during enough of the peak period to provide sufficient value. However, if the wind power plant is developed over geographically disperse locations, the timing and availability of wind power from these multiple sources could provide a better match with the utility's peak load than a single site. There are other issues that arise when considering disperse wind plant development. Singular development can result in economies of scale and might reduce the costs of obtaining multiple permits and multiple interconnections. However, disperse development can result in cost efficiencies if interconnection can be accomplished at lower voltages or at locations closer to load centers. Several wind plants are in various stages of planning or development in the US. Although some of these are small-scale demonstration projects, significant wind capacity has been developed in Minnesota, with additional developments planned in Wyoming, Iowa and Texas. As these and other projects are planned and developed, there is a need to perform analysis of the value of geographically disperse sites on the reliability of the overall wind plant.This paper uses a production-cost/reliability model to analyze the reliability of several wind sites in the state of Minnesota. The analysis finds that the use of a model with traditional reliability measures does not produce consistent, robust results. An approach based on fuzzy set theory is applied in this paper, with improved results. Using such a model, the authors find that system reliability can be optimized with a mix of disperse wind sites

  11. Planning, Conducting, and Documenting Data Analysis for Program Improvement

    Science.gov (United States)

    Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne

    2015-01-01

    This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…

  12. AMSAA Reliability Growth Guide

    National Research Council Canada - National Science Library

    Broemm, William

    2000-01-01

    ... has developed reliability growth methodology for all phases of the process, from planning to tracking to projection. The report presents this methodology and associated reliability growth concepts.

  13. Learning reliable manipulation strategies without initial physical models

    Science.gov (United States)

    Christiansen, Alan D.; Mason, Matthew T.; Mitchell, Tom M.

    1990-01-01

    A description is given of a robot, possessing limited sensory and effectory capabilities but no initial model of the effects of its actions on the world, that acquires such a model through exploration, practice, and observation. By acquiring an increasingly correct model of its actions, it generates increasingly successful plans to achieve its goals. In an apparently nondeterministic world, achieving reliability requires the identification of reliable actions and a preference for using such actions. Furthermore, by selecting its training actions carefully, the robot can significantly improve its learning rate.

  14. Developing Reliable Life Support for Mars

    Science.gov (United States)

    Jones, Harry W.

    2017-01-01

    A human mission to Mars will require highly reliable life support systems. Mars life support systems may recycle water and oxygen using systems similar to those on the International Space Station (ISS). However, achieving sufficient reliability is less difficult for ISS than it will be for Mars. If an ISS system has a serious failure, it is possible to provide spare parts, or directly supply water or oxygen, or if necessary bring the crew back to Earth. Life support for Mars must be designed, tested, and improved as needed to achieve high demonstrated reliability. A quantitative reliability goal should be established and used to guide development t. The designers should select reliable components and minimize interface and integration problems. In theory a system can achieve the component-limited reliability, but testing often reveal unexpected failures due to design mistakes or flawed components. Testing should extend long enough to detect any unexpected failure modes and to verify the expected reliability. Iterated redesign and retest may be required to achieve the reliability goal. If the reliability is less than required, it may be improved by providing spare components or redundant systems. The number of spares required to achieve a given reliability goal depends on the component failure rate. If the failure rate is under estimated, the number of spares will be insufficient and the system may fail. If the design is likely to have undiscovered design or component problems, it is advisable to use dissimilar redundancy, even though this multiplies the design and development cost. In the ideal case, a human tended closed system operational test should be conducted to gain confidence in operations, maintenance, and repair. The difficulty in achieving high reliability in unproven complex systems may require the use of simpler, more mature, intrinsically higher reliability systems. The limitations of budget, schedule, and technology may suggest accepting lower and

  15. Embedded Sensors and Controls to Improve Component Performance and Reliability Conceptual Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Kisner, R.; Melin, A.; Burress, T.; Fugate, D.; Holcomb, D.; Wilgen, J.; Miller, J.; Wilson, D.; Silva, P.; Whitlow, L.; Peretz, F.

    2012-09-15

    The objective of this project is to demonstrate improved reliability and increased performance made possible by deeply embedding instrumentation and controls (I&C) in nuclear power plant (NPP) components and systems. The project is employing a highly instrumented canned rotor, magnetic bearing, fluoride salt pump as its I&C technology demonstration platform. I&C is intimately part of the basic millisecond-by-millisecond functioning of the system; treating I&C as an integral part of the system design is innovative and will allow significant improvement in capabilities and performance. As systems become more complex and greater performance is required, traditional I&C design techniques become inadequate and more advanced I&C needs to be applied. New I&C techniques enable optimal and reliable performance and tolerance of noise and uncertainties in the system rather than merely monitoring quasistable performance. Traditionally, I&C has been incorporated in NPP components after the design is nearly complete; adequate performance was obtained through over-design. By incorporating I&C at the beginning of the design phase, the control system can provide superior performance and reliability and enable designs that are otherwise impossible. This report describes the progress and status of the project and provides a conceptual design overview for the platform to demonstrate the performance and reliability improvements enabled by advanced embedded I&C.

  16. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    KELMENSON, R.L.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999

  17. Improvement of the reliability graph with general gates to analyze the reliability of dynamic systems that have various operation modes

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Seung Ki [Div. of Research Reactor System Design, Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); No, Young Gyu; Seong, Poong Hyun [Dept. of Nuclear and Quantum Engineering, Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2016-04-15

    The safety of nuclear power plants is analyzed by a probabilistic risk assessment, and the fault tree analysis is the most widely used method for a risk assessment with the event tree analysis. One of the well-known disadvantages of the fault tree is that drawing a fault tree for a complex system is a very cumbersome task. Thus, several graphical modeling methods have been proposed for the convenient and intuitive modeling of complex systems. In this paper, the reliability graph with general gates (RGGG) method, one of the intuitive graphical modeling methods based on Bayesian networks, is improved for the reliability analyses of dynamic systems that have various operation modes with time. A reliability matrix is proposed and it is explained how to utilize the reliability matrix in the RGGG for various cases of operation mode changes. The proposed RGGG with a reliability matrix provides a convenient and intuitive modeling of various operation modes of complex systems, and can also be utilized with dynamic nodes that analyze the failure sequences of subcomponents. The combinatorial use of a reliability matrix with dynamic nodes is illustrated through an application to a shutdown cooling system in a nuclear power plant.

  18. Improvement of the reliability graph with general gates to analyze the reliability of dynamic systems that have various operation modes

    International Nuclear Information System (INIS)

    Shin, Seung Ki; No, Young Gyu; Seong, Poong Hyun

    2016-01-01

    The safety of nuclear power plants is analyzed by a probabilistic risk assessment, and the fault tree analysis is the most widely used method for a risk assessment with the event tree analysis. One of the well-known disadvantages of the fault tree is that drawing a fault tree for a complex system is a very cumbersome task. Thus, several graphical modeling methods have been proposed for the convenient and intuitive modeling of complex systems. In this paper, the reliability graph with general gates (RGGG) method, one of the intuitive graphical modeling methods based on Bayesian networks, is improved for the reliability analyses of dynamic systems that have various operation modes with time. A reliability matrix is proposed and it is explained how to utilize the reliability matrix in the RGGG for various cases of operation mode changes. The proposed RGGG with a reliability matrix provides a convenient and intuitive modeling of various operation modes of complex systems, and can also be utilized with dynamic nodes that analyze the failure sequences of subcomponents. The combinatorial use of a reliability matrix with dynamic nodes is illustrated through an application to a shutdown cooling system in a nuclear power plant

  19. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  20. OPTIMUM DESIGN OF EXPERIMENTS FOR ACCELERATED RELIABILITY TESTING

    Directory of Open Access Journals (Sweden)

    Sebastian Marian ZAHARIA

    2014-05-01

    Full Text Available In this paper is presented a case study that demonstrates how design to experiments (DOE information can be used to design better accelerated reliability tests. In the case study described in this paper, will be done a comparison and optimization between main accelerated reliability test plans (3 Level Best Standard Plan, 3 Level Best Compromise Plan, 3 Level Best Equal Expected Number Failing Plan, 3 Level 4:2:1 Allocation Plan. Before starting an accelerated reliability test, it is advisable to have a plan that helps in accurately estimating reliability at operating conditions while minimizing test time and costs. A test plan should be used to decide on the appropriate stress levels that should be used (for each stress type and the amount of the test units that need to be allocated to the different stress levels (for each combination of the different stress types' levels. For the case study it used ALTA 7 software what provides a complete analysis for data from accelerated reliability tests

  1. Cost analysis of reliability investigations

    International Nuclear Information System (INIS)

    Schmidt, F.

    1981-01-01

    Taking Epsteins testing theory as a basis, premisses are formulated for the selection of cost-optimized reliability inspection plans. Using an example, the expected testing costs and inspection time periods of various inspection plan types, standardized on the basis of the exponential distribution, are compared. It can be shown that sequential reliability tests usually involve lower costs than failure or time-fixed tests. The most 'costly' test is to be expected with the inspection plan type NOt. (orig.) [de

  2. Reliability of a patient survey assessing cost-related changes in health care use among high deductible health plan enrollees

    Directory of Open Access Journals (Sweden)

    Galbraith Alison A

    2011-05-01

    Full Text Available Abstract Background Recent increases in patient cost-sharing for health care have lent increasing importance to monitoring cost-related changes in health care use. Despite the widespread use of survey questions to measure changes in health care use and related behaviors, scant data exists on the reliability of such questions. Methods We administered a cross-sectional survey to a stratified random sample of families in a New England health plan's high deductible health plan (HDHP with ≥ $500 in annualized out-of-pocket expenditures. Enrollees were asked about their knowledge of their plan, information seeking, behavior change associated with having a deductible, experience of delay in care due in part to cost, and hypothetical delay in care due in part to cost. Initial respondents were mailed a follow-up survey within two weeks of each family returning the original survey. We computed several agreement statistics to measure the test-retest reliability for select questions. We also conducted continuity adjusted chi-square, and McNemar tests in both the original and follow-up samples to measure the degree to which our results could be reproduced. Analyses were stratified by self-reported income. Results The test-retest reliability was moderate for the majority of questions (0.41 - 0.60 and the level of test-retest reliability did not differ substantially across each of the broader domains of questions. The observed proportions of respondents with delayed or foregone pediatric, adult, or any family care were similar when comparing the original and follow-up surveys. In the original survey, respondents in the lower-income group were more likely to delay or forego pediatric care, adult care, or any family care. All of the tests comparing income groups in the follow-up survey produced the same result as in the original survey. Conclusions In this population of HDHP beneficiaries, we found that survey questions concerning plan knowledge, information

  3. The Reliability of In-Training Assessment when Performance Improvement Is Taken into Account

    Science.gov (United States)

    van Lohuizen, Mirjam T.; Kuks, Jan B. M.; van Hell, Elisabeth A.; Raat, A. N.; Stewart, Roy E.; Cohen-Schotanus, Janke

    2010-01-01

    During in-training assessment students are frequently assessed over a longer period of time and therefore it can be expected that their performance will improve. We studied whether there really is a measurable performance improvement when students are assessed over an extended period of time and how this improvement affects the reliability of the…

  4. Monolithic QCL design approaches for improved reliability and affordability

    Science.gov (United States)

    Law, K. K.

    2013-12-01

    Many advances have been made recently in mid-wave infrared and long-wave infrared quantum cascade lasers (QCLs) technologies, and there is an increasing demand for these laser sources for ever expanding Naval, DoD and homeland security applications. We will discuss in this paper a portfolio of various Naval Air Warfare Weapons Division's current and future small business innovative research programs and efforts on significantly improving QCLs' performance, affordability, and reliability.

  5. Improved Planning Time and Plan Quality Through Multicriteria Optimization for Intensity-Modulated Radiotherapy

    International Nuclear Information System (INIS)

    Craft, David L.; Hong, Theodore S.; Shih, Helen A.; Bortfeld, Thomas R.

    2012-01-01

    Purpose: To test whether multicriteria optimization (MCO) can reduce treatment planning time and improve plan quality in intensity-modulated radiotherapy (IMRT). Methods and Materials: Ten IMRT patients (5 with glioblastoma and 5 with locally advanced pancreatic cancers) were logged during the standard treatment planning procedure currently in use at Massachusetts General Hospital (MGH). Planning durations and other relevant planning information were recorded. In parallel, the patients were planned using an MCO planning system, and similar planning time data were collected. The patients were treated with the standard plan, but each MCO plan was also approved by the physicians. Plans were then blindly reviewed 3 weeks after planning by the treating physician. Results: In all cases, the treatment planning time was vastly shorter for the MCO planning (average MCO treatment planning time was 12 min; average standard planning time was 135 min). The physician involvement time in the planning process increased from an average of 4.8 min for the standard process to 8.6 min for the MCO process. In all cases, the MCO plan was blindly identified as the superior plan. Conclusions: This provides the first concrete evidence that MCO-based planning is superior in terms of both planning efficiency and dose distribution quality compared with the current trial and error–based IMRT planning approach.

  6. Technology Improvement for the High Reliability LM-2F Launch Vehicle

    Institute of Scientific and Technical Information of China (English)

    QIN Tong; RONG Yi; ZHENG Liwei; ZHANG Zhi

    2017-01-01

    The Long March 2F (LM-2F) launch vehicle,the only launch vehicle designed for manned space flight in China,successfully launched the Tiangong 2 space laboratory and the Shenzhou ll manned spaceship into orbits in 2016 respectively.In this study,it introduces the technological improvements for enhancing the reliability of the LM-2F launch vehicle in the aspects of general technology,control system,manufacture and ground support system.The LM2F launch vehicle will continue to provide more contributions to the Chinese Space Station Project with its high reliability and 100% success rate.

  7. Reliability Characteristics of Power Plants

    Directory of Open Access Journals (Sweden)

    Zbynek Martinek

    2017-01-01

    Full Text Available This paper describes the phenomenon of reliability of power plants. It gives an explanation of the terms connected with this topic as their proper understanding is important for understanding the relations and equations which model the possible real situations. The reliability phenomenon is analysed using both the exponential distribution and the Weibull distribution. The results of our analysis are specific equations giving information about the characteristics of the power plants, the mean time of operations and the probability of failure-free operation. Equations solved for the Weibull distribution respect the failures as well as the actual operating hours. Thanks to our results, we are able to create a model of dynamic reliability for prediction of future states. It can be useful for improving the current situation of the unit as well as for creating the optimal plan of maintenance and thus have an impact on the overall economics of the operation of these power plants.

  8. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  9. Reliability design of mechanical systems a guide for mechanical and civil engineers

    CERN Document Server

    Woo, Seongwoo

    2017-01-01

    This book describes basic reliability concepts – parametric ALT plan, failure mechanism and design, and reliability testing with acceleration factor and sample size equation. A generalized life-stress failure model with a new effort concept has been derived and recommended to calculate the acceleration factor of the mechanical system. The new sample size equation with the acceleration factor has also been derived to carry out the parametric ALT. This new parametric ALT should help a mechanical/civil engineer to uncover the design parameters affecting reliability during the design process of the mechanical system. Consequently, it should help companies to improve product reliability and avoid recalls due to the product/structure failures in the field. As the improper or missing design parameters in the design phase are experimentally identified by this new reliability design method - parametric ALT, the mechanical/civil engineering system might improve in reliability by the increase in lifetime and the reduc...

  10. Distribution System Reliability Analysis for Smart Grid Applications

    Science.gov (United States)

    Aljohani, Tawfiq Masad

    Reliability of power systems is a key aspect in modern power system planning, design, and operation. The ascendance of the smart grid concept has provided high hopes of developing an intelligent network that is capable of being a self-healing grid, offering the ability to overcome the interruption problems that face the utility and cost it tens of millions in repair and loss. To address its reliability concerns, the power utilities and interested parties have spent extensive amount of time and effort to analyze and study the reliability of the generation and transmission sectors of the power grid. Only recently has attention shifted to be focused on improving the reliability of the distribution network, the connection joint between the power providers and the consumers where most of the electricity problems occur. In this work, we will examine the effect of the smart grid applications in improving the reliability of the power distribution networks. The test system used in conducting this thesis is the IEEE 34 node test feeder, released in 2003 by the Distribution System Analysis Subcommittee of the IEEE Power Engineering Society. The objective is to analyze the feeder for the optimal placement of the automatic switching devices and quantify their proper installation based on the performance of the distribution system. The measures will be the changes in the reliability system indices including SAIDI, SAIFI, and EUE. The goal is to design and simulate the effect of the installation of the Distributed Generators (DGs) on the utility's distribution system and measure the potential improvement of its reliability. The software used in this work is DISREL, which is intelligent power distribution software that is developed by General Reliability Co.

  11. Reliable Rescue Routing Optimization for Urban Emergency Logistics under Travel Time Uncertainty

    Directory of Open Access Journals (Sweden)

    Qiuping Li

    2018-02-01

    Full Text Available The reliability of rescue routes is critical for urban emergency logistics during disasters. However, studies on reliable rescue routing under stochastic networks are still rare. This paper proposes a multiobjective rescue routing model for urban emergency logistics under travel time reliability. A hybrid metaheuristic integrating ant colony optimization (ACO and tabu search (TS was designed to solve the model. An experiment optimizing rescue routing plans under a real urban storm event, was carried out to validate the proposed model. The experimental results showed how our approach can improve rescue efficiency with high travel time reliability.

  12. 77 FR 59888 - General Conference Committee of the National Poultry Improvement Plan

    Science.gov (United States)

    2012-10-01

    ... Improvement Plan AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Notice of intent to renew... the General Conference Committee of the National Poultry Improvement Plan (Committee) for a 2year... Improvement Plan, VS, APHIS, USDA, 1506 Klondike Road, Suite 300, Conyers, GA 30094; (770) 922-3496...

  13. The commissioning of CMS sites: Improving the site reliability

    International Nuclear Information System (INIS)

    Belforte, S; Fisk, I; Flix, J; Hernandez, J M; Klem, J; Letts, J; Magini, N; Saiz, P; Sciaba, A

    2010-01-01

    The computing system of the CMS experiment works using distributed resources from more than 60 computing centres worldwide. These centres, located in Europe, America and Asia are interconnected by the Worldwide LHC Computing Grid. The operation of the system requires a stable and reliable behaviour of the underlying infrastructure. CMS has established a procedure to extensively test all relevant aspects of a Grid site, such as the ability to efficiently use their network to transfer data, the functionality of all the site services relevant for CMS and the capability to sustain the various CMS computing workflows at the required scale. This contribution describes in detail the procedure to rate CMS sites depending on their performance, including the complete automation of the program, the description of monitoring tools, and its impact in improving the overall reliability of the Grid from the point of view of the CMS computing system.

  14. Cost/worth assessment of reliability improvement in distribution networks by means of artificial intelligence

    Energy Technology Data Exchange (ETDEWEB)

    Bouhouras, Aggelos S.; Labridis, Dimitris P.; Bakirtzis, Anastasios G. [Power Systems Laboratory, Aristotle University of Thessaloniki, Dept. of Electrical and Computer Engineering, 54124 Thessaloniki (Greece)

    2010-06-15

    A major challenge for the power utilities today is to ensure a high level of reliability of supply to customers. Two main factors determine the feasibility of a project that improves the reliability of supply: the project cost (investment and operational) and the benefits that result from the implementation of the project. This paper examines the implementation of an Artificial Intelligence System in an urban distribution network, capable to locate and isolate short circuit faults in the feeder, thus accomplishing immediate restoration of electric supply to the customers. The paper describes the benefits of the project, which are supply reliability improvement and distribution network loss reduction through network reconfigurations. By comparison of the project benefits and costs the economic feasibility of such a project for an underground distribution feeder in Greece is demonstrated. (author)

  15. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    Science.gov (United States)

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  16. Compression planning for continuous improvement in quality programs

    International Nuclear Information System (INIS)

    Willis, Y.A.; Hood, F.C.

    1992-01-01

    This paper describes Compression Planning, an innovative approach for planning in groups. This participative and structured approach is especially suitable for technical and highly regulated organizations. Compression Planning was applied to the first organization-wide effort at training integration for regulatory compliance, at Battelle Pacific Northwest Laboratory (PNL), a multi-program national laboratory. The planning process was judged as measurably superior to PNL's customary planning. Within 10 days a training policy was issued and an action plan drafted. The participants produced a report identifying and prioritizing 33 key training issues; began to data gather and solicit input from personnel Lab-wide, producing a 2-volume training inventory; and formulated 14 recommendations for implementation. Two years later the plan is still evolving, as PNL training continues to develop, consistent with Continuous Improvement Process objectives

  17. Revised scoring and improved reliability for the Communication Patterns Questionnaire.

    Science.gov (United States)

    Crenshaw, Alexander O; Christensen, Andrew; Baucom, Donald H; Epstein, Norman B; Baucom, Brian R W

    2017-07-01

    The Communication Patterns Questionnaire (CPQ; Christensen, 1987) is a widely used self-report measure of couple communication behavior and is well validated for assessing the demand/withdraw interaction pattern, which is a robust predictor of poor relationship and individual outcomes (Schrodt, Witt, & Shimkowski, 2014). However, no studies have examined the CPQ's factor structure using analytic techniques sufficient by modern standards, nor have any studies replicated the factor structure using additional samples. Further, the current scoring system uses fewer than half of the total items for its 4 subscales, despite the existence of unused items that have content conceptually consistent with those subscales. These characteristics of the CPQ have likely contributed to findings that subscale scores are often troubled by suboptimal psychometric properties such as low internal reliability (e.g., Christensen, Eldridge, Catta-Preta, Lim, & Santagata, 2006). The present study uses exploratory and confirmatory factor analyses on 4 samples to reexamine the factor structure of the CPQ to improve scale score reliability and to determine if including more items in the subscales is warranted. Results indicate that a 3-factor solution (constructive communication and 2 demand/withdraw scales) provides the best fit for the data. That factor structure was confirmed in the replication samples. Compared with the original scales, the revised scales include additional items that expand the conceptual range of the constructs, substantially improve reliability of scale scores, and demonstrate stronger associations with relationship satisfaction and sensitivity to change in therapy. Implications for research and treatment are discussed. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  18. Dosimetric improvements following 3D planning of tangential breast irradiation

    International Nuclear Information System (INIS)

    Aref, Amr; Thornton, Dale; Youssef, Emad; He, Tony; Tekyi-Mensah, Samuel; Denton, Lori; Ezzell, Gary

    2000-01-01

    Purpose: To evaluate the dosimetric difference between a simple radiation therapy plan utilizing a single contour and a more complex three-dimensional (3D) plan utilizing multiple contours, lung inhomogeneity correction, and dose-based compensators. Methods and Materials: This is a study of the radiation therapy (RT) plans of 85 patients with early breast cancer. All patients were considered for breast-conserving management and treated by conventional tangential fields technique. Two plans were generated for each patient. The first RT plan was based on a single contour taken at the central axis and utilized two wedges. The second RT plan was generated by using the 3D planning system to design dose-based compensators after lung inhomogeneity correction had been made. The endpoints of the study were the comparison between the volumes receiving greater than 105% and greater than 110% of the reference dose, as well as the magnitude of the treated volume maximum dose. Dosimetric improvement was defined to be of significant value if the volume receiving > 105% of one plan was reduced by at least 50% with the absolute difference between the volumes being 5% or greater. The dosimetric improvements in 49 3D plans (58%) were considered of significant value. Patients' field separation and breast size did not predict the magnitude of improvement in dosimetry. Conclusion: Dose-based compensator plans significantly reduced the volumes receiving > 105%, >110%, and volume maximum dose.

  19. Market and plan characteristics related to HMO quality and improvement.

    Science.gov (United States)

    Scanlon, Dennis P; Swaminathan, Shailender; Chernew, Michael; Lee, Woolton

    2006-12-01

    Existing research on health plan performance examines whether variation in plans' scores is related to enrollee and health plan traits, primarily using cross-sectional research designs. This study extends that literature by incorporating data on market characteristics using a longitudinal framework. We estimate multivariate growth models that relate plan performance on standard measures to market and HMO characteristics using an unbalanced panel of data for 1998 to 2002. We find that HMO competition is not associated with better performance or greater rates of improvement in performance on the HEDIS chronic care measures. HMO penetration, on the other hand, is positively associated with HEDIS performance in several of the chronic care process-and-outcomes measures but not with a greater rate of improvement through time. Our analysis indicates that a significant percentage of the unexplained variation in quality improvement is because of permanent, unobserved plan-level characteristics that future research should strive to identify.

  20. Improved FTA methodology and application to subsea pipeline reliability design.

    Science.gov (United States)

    Lin, Jing; Yuan, Yongbo; Zhang, Mingyuan

    2014-01-01

    An innovative logic tree, Failure Expansion Tree (FET), is proposed in this paper, which improves on traditional Fault Tree Analysis (FTA). It describes a different thinking approach for risk factor identification and reliability risk assessment. By providing a more comprehensive and objective methodology, the rather subjective nature of FTA node discovery is significantly reduced and the resulting mathematical calculations for quantitative analysis are greatly simplified. Applied to the Useful Life phase of a subsea pipeline engineering project, the approach provides a more structured analysis by constructing a tree following the laws of physics and geometry. Resulting improvements are summarized in comparison table form.

  1. Optimizing perioperative decision making: improved information for clinical workflow planning.

    Science.gov (United States)

    Doebbeling, Bradley N; Burton, Matthew M; Wiebke, Eric A; Miller, Spencer; Baxter, Laurence; Miller, Donald; Alvarez, Jorge; Pekny, Joseph

    2012-01-01

    Perioperative care is complex and involves multiple interconnected subsystems. Delayed starts, prolonged cases and overtime are common. Surgical procedures account for 40-70% of hospital revenues and 30-40% of total costs. Most planning and scheduling in healthcare is done without modern planning tools, which have potential for improving access by assisting in operations planning support. We identified key planning scenarios of interest to perioperative leaders, in order to examine the feasibility of applying combinatorial optimization software solving some of those planning issues in the operative setting. Perioperative leaders desire a broad range of tools for planning and assessing alternate solutions. Our modeled solutions generated feasible solutions that varied as expected, based on resource and policy assumptions and found better utilization of scarce resources. Combinatorial optimization modeling can effectively evaluate alternatives to support key decisions for planning clinical workflow and improving care efficiency and satisfaction.

  2. NDE reliability and advanced NDE technology validation

    International Nuclear Information System (INIS)

    Doctor, S.R.; Deffenbaugh, J.D.; Good, M.S.; Green, E.R.; Heasler, P.G.; Hutton, P.H.; Reid, L.D.; Simonen, F.A.; Spanner, J.C.; Vo, T.V.

    1989-01-01

    This paper reports on progress for three programs: (1) evaluation and improvement in nondestructive examination reliability for inservice inspection of light water reactors (LWR) (NDE Reliability Program), (2) field validation acceptance, and training for advanced NDE technology, and (3) evaluation of computer-based NDE techniques and regional support of inspection activities. The NDE Reliability Program objectives are to quantify the reliability of inservice inspection techniques for LWR primary system components through independent research and establish means for obtaining improvements in the reliability of inservice inspections. The areas of significant progress will be described concerning ASME Code activities, re-analysis of the PISC-II data, the equipment interaction matrix study, new inspection criteria, and PISC-III. The objectives of the second program are to develop field procedures for the AE and SAFT-UT techniques, perform field validation testing of these techniques, provide training in the techniques for NRC headquarters and regional staff, and work with the ASME Code for the use of these advanced technologies. The final program's objective is to evaluate the reliability and accuracy of interpretation of results from computer-based ultrasonic inservice inspection systems, and to develop guidelines for NRC staff to monitor and evaluate the effectiveness of inservice inspections conducted on nuclear power reactors. This program started in the last quarter of FY89, and the extent of the program was to prepare a work plan for presentation to and approval from a technical advisory group of NRC staff

  3. Attitude Control of Quad-rotor by Improving the Reliability of Multi-Sensor System

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Dong Hyeon; Chong, Kil To [Chon-bok National University, Jeonju (Korea, Republic of); Park, Jong Ho [Seonam University, Namwon (Korea, Republic of); Ryu, Ji Hyoung [ETRI, Daejeon (Korea, Republic of)

    2015-05-15

    This paper presents the results of study for improving the reliability of quadrotor attitude control by applying a multi-sensor along with a data fusion algorithm. First, a mathematical model of the quadrotor dynamics was developed. Then, using the quadrotor mathematical model, simulations were performed using the improved reliability multi-sensor data as the inputs. From the simulation results, we designed a Gimbal-equipped quadrotor system. With the quadrotor in a hover state, we performed experiments according to the angle change of the user's specifications . We then calculated the attitude control data from the actual experimental data. Furthermore, with additional simulations, we verified the performance of the designed quadrotor attitude control system with multiple sensors.

  4. Reliability improvement: where do we go from here. The role of codes and standards

    International Nuclear Information System (INIS)

    Davidson, R.H.

    1976-01-01

    The role of codes and standards in contributing to the future improvement is discussed. The Nuclear Plant Reliability Data System is examined. It is suggested that two systems of the type are needed. One system should focus on component and system reliability while the other should focus on system availability, capacity factor, and fixed outage rate assessment

  5. Can a More User-Friendly Medicare Plan Finder Improve Consumers' Selection of Medicare Plans?

    Science.gov (United States)

    Martino, Steven C; Kanouse, David E; Miranda, David J; Elliott, Marc N

    2017-10-01

    To evaluate the efficacy for consumers of two potential enhancements to the Medicare Plan Finder (MPF)-a simplified data display and a "quick links" home page designed to match the specific tasks that users seek to accomplish on the MPF. Participants (N = 641) were seniors and adult caregivers of seniors who were recruited from a national online panel. Participants browsed a simulated version of the MPF, made a hypothetical plan choice, and reported on their experience. Participants were randomly assigned to one of eight conditions in a fully factorial design: 2 home pages (quick links, current MPF home page) × 2 data displays (simplified, current MPF display) × 2 plan types (stand-alone prescription drug plan [PDP], Medicare Advantage plan with prescription drug coverage [MA-PD]). The quick links page resulted in more favorable perceptions of the MPF, improved users' understanding of the information, and increased the probability of choosing the objectively best plan. The simplified data display resulted in a more favorable evaluation of the website, better comprehension of the displayed information, and, among those choosing a PDP only, an increased probability of choosing the best plan. Design enhancements could markedly improve average website users' understanding, ability to use, and experience of using the MPF. © Health Research and Educational Trust.

  6. Assessing the validity and reliability of self-report data on contraception use in the MObile Technology for Improved Family Planning (MOTIF) randomised controlled trial.

    Science.gov (United States)

    Smith, Chris; Edwards, Phil; Free, Caroline

    2018-03-15

    A variety of different approaches to measuring contraceptive use have been used or proposed, either to assess current use or adherence over time, using subjective or objective measures. This paper reports an overview of approaches to measuring adherence to the oral contraceptive, intra-uterine device, sub-dermal implant, and injectable and describes how we assessed contraception use in the MObile Technology for Improved Family Planning (MOTIF) trial in Cambodia. We summarise and discuss advantages and disadvantages of different subjective and objective approaches to measuring adherence to the oral contraceptive, intra-uterine device, sub-dermal implant, and injectable such as self-reports, clinic records, electronic monitoring devices, clinical examination and biomarkers. For the MOTIF trial, we did not consider it feasible to measure objective contraception use as many participants lived a long distance from the clinic and we were concerned whether it was appropriate to ask women to return to clinic for a physical examination simply to verify self-report information already provided. We aimed to assess the validity of the four-month data with 50 participants, calculating the sensitivity and specificity of self-reported data compared with objective measurement. For the 46 valid measurements obtained, the sensitivity and specificity was 100% for self-reported contraception use compared to objective measurement but this study had some limitations. To assess reliability of self-report data we compared calendar data collected on effective contraception use at months 1-4 post-abortion, collected separately at four and 12 months. Agreement ranged from 80 to 84% with a kappa statistic ranging from 0·59 to 0·67 indicating fair to good agreement. There is no perfect method of assessing contraception use and researchers designing future studies should give consideration of what to measure, for example current use or detailed patterns of use over time, and remain mindful

  7. Relationship between competitive power markets and grid reliability : the PJM RTO experience

    Energy Technology Data Exchange (ETDEWEB)

    Harris, P.G. [PJM Interconnection LLC, Philadelphia, PA (United States)

    2005-07-01

    PJM is one of the largest grid operators in North America, serving 51 million people. This white paper examined the causes of the 2003 blackout in relation to grid management tools, operator training and system planning and analysis. The aim of the paper was to explain how competition and regional transmission offices (RTOs) are addressing these issues and doing more to help improve reliability and strengthen the grid. It was suggested that consumer savings can be achieved while enhancing, rather than diminishing the reliability and security of the electricity system. Changes in the electricity industry were reviewed. Issues concerning the lack of data to measure grid reliability were discussed. It was suggested that key influences on grid reliability are regional dispatch and scheduling practices, as well as RTO coordination and system operator training. Security constrained unit commitment was discussed, as well as various new technologies to improve reliability, including real-time contingency analysis and generation dispatch; real time voltage analysis; and visualization technology. Applications scales and scopes were discussed, as well as issues concerning RTO coordination. Issues concerning enhanced operator information through data transfer protocols were discussed, as well as the development of enhanced reliability tools through joint operating agreements. It was suggested that regional planning and large wholesale markets support regional reliability. It was concluded that regional RTO markets have evolved to produce economic efficiency and enhanced reliability in short-term and mid-term operations, and provide transparent regional information that will assist in providing data in the future, in order to address the long-term infrastructure investment concerns that exist on a national level.

  8. Reliability of implant placement after virtual planning of implant positions using cone beam CT data and surgical (guide) templates.

    Science.gov (United States)

    Nickenig, Hans-Joachim; Eitner, Stephan

    2007-01-01

    We assessed the reliability of implant placement after virtual planning of implant positions using cone-beam CT data and surgical guide templates. A total of 102 patients (250 implants, 55.4% mandibular; mean patient age, 40.4 years) who had undergone implant treatment therapy in an armed forces dental clinic (Cologne, Germany) between July 1, 2005 and December 1, 2005. They were treated with a system that allows transfer of virtual planning to surgical guide templates. Only in eight cases the surgical guides were not used because a delayed implant placement was necessary. In four posterior mandibular cases, handling was limited because of reduced interocclusal distance, requiring 50% shortening of the drill guides. The predictability of implant size was high: only one implant was changed to a smaller diameter (because of insufficient bone). In all cases, critical anatomical structures were protected and no complications were detected in postoperative panoramic radiographs. In 58.1% (147) of the 250 implants, a flapless surgery plan was realized. Implant placement after virtual planning of implant positions using cone beam CT data and surgical templates can be reliable for preoperative assessment of implant size, position, and anatomical complications. It is also indicative of cases amenable to flapless surgery.

  9. Reliability

    OpenAIRE

    Condon, David; Revelle, William

    2017-01-01

    Separating the signal in a test from the irrelevant noise is a challenge for all measurement. Low test reliability limits test validity, attenuates important relationships, and can lead to regression artifacts. Multiple approaches to the assessment and improvement of reliability are discussed. The advantages and disadvantages of several different approaches to reliability are considered. Practical advice on how to assess reliability using open source software is provided.

  10. SU-D-BRD-03: Improving Plan Quality with Automation of Treatment Plan Checks

    International Nuclear Information System (INIS)

    Covington, E; Younge, K; Chen, X; Lee, C; Matuszak, M; Kessler, M; Acosta, E; Orow, A; Filpansick, S; Moran, J; Keranen, W

    2015-01-01

    Purpose: To evaluate the effectiveness of an automated plan check tool to improve first-time plan quality as well as standardize and document performance of physics plan checks. Methods: The Plan Checker Tool (PCT) uses the Eclipse Scripting API to check and compare data from the treatment planning system (TPS) and treatment management system (TMS). PCT was created to improve first-time plan quality, reduce patient delays, increase efficiency of our electronic workflow, and to standardize and partially automate plan checks in the TPS. A framework was developed which can be configured with different reference values and types of checks. One example is the prescribed dose check where PCT flags the user when the planned dose and the prescribed dose disagree. PCT includes a comprehensive checklist of automated and manual checks that are documented when performed by the user. A PDF report is created and automatically uploaded into the TMS. Prior to and during PCT development, errors caught during plan checks and also patient delays were tracked in order to prioritize which checks should be automated. The most common and significant errors were determined. Results: Nineteen of 33 checklist items were automated with data extracted with the PCT. These include checks for prescription, reference point and machine scheduling errors which are three of the top six causes of patient delays related to physics and dosimetry. Since the clinical roll-out, no delays have been due to errors that are automatically flagged by the PCT. Development continues to automate the remaining checks. Conclusion: With PCT, 57% of the physics plan checklist has been partially or fully automated. Treatment delays have declined since release of the PCT for clinical use. By tracking delays and errors, we have been able to measure the effectiveness of automating checks and are using this information to prioritize future development. This project was supported in part by P01CA059827

  11. SU-D-BRD-03: Improving Plan Quality with Automation of Treatment Plan Checks

    Energy Technology Data Exchange (ETDEWEB)

    Covington, E; Younge, K; Chen, X; Lee, C; Matuszak, M; Kessler, M; Acosta, E; Orow, A; Filpansick, S; Moran, J [University of Michigan Hospital and Health System, Ann Arbor, MI (United States); Keranen, W [Varian Medical Systems, Palo Alto, CA (United States)

    2015-06-15

    Purpose: To evaluate the effectiveness of an automated plan check tool to improve first-time plan quality as well as standardize and document performance of physics plan checks. Methods: The Plan Checker Tool (PCT) uses the Eclipse Scripting API to check and compare data from the treatment planning system (TPS) and treatment management system (TMS). PCT was created to improve first-time plan quality, reduce patient delays, increase efficiency of our electronic workflow, and to standardize and partially automate plan checks in the TPS. A framework was developed which can be configured with different reference values and types of checks. One example is the prescribed dose check where PCT flags the user when the planned dose and the prescribed dose disagree. PCT includes a comprehensive checklist of automated and manual checks that are documented when performed by the user. A PDF report is created and automatically uploaded into the TMS. Prior to and during PCT development, errors caught during plan checks and also patient delays were tracked in order to prioritize which checks should be automated. The most common and significant errors were determined. Results: Nineteen of 33 checklist items were automated with data extracted with the PCT. These include checks for prescription, reference point and machine scheduling errors which are three of the top six causes of patient delays related to physics and dosimetry. Since the clinical roll-out, no delays have been due to errors that are automatically flagged by the PCT. Development continues to automate the remaining checks. Conclusion: With PCT, 57% of the physics plan checklist has been partially or fully automated. Treatment delays have declined since release of the PCT for clinical use. By tracking delays and errors, we have been able to measure the effectiveness of automating checks and are using this information to prioritize future development. This project was supported in part by P01CA059827.

  12. Improved Yield, Performance and Reliability of High-Actuator-Count Deformable Mirrors, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The project team will conduct processing and design research aimed at improving yield, performance, and reliability of high-actuator-count micro-electro-mechanical...

  13. Self-Study Guide for Florida VPK Provider Improvement Plan Development

    Science.gov (United States)

    Phillips, Beth M.; Mazzeo, Debbie; Smith, Kevin

    2016-01-01

    This Self-Study Guide has been developed to support Florida Voluntary Prekindergarten Providers (VPK) who are required to complete an improvement plan process (i.e., low-performing providers). The guide has sections that can be used during both the process of selecting target areas for an improvement plan and the process of implementing new or…

  14. Linking the Teacher Appraisal Process to the School Improvement Plan

    Science.gov (United States)

    Reddekopp, Therese

    2007-01-01

    If a school improvement plan includes input from all stakeholders and focuses on data-driven processes that are linked to teacher appraisal, it can be powerful in leading the school toward the common mission of achieving student success. Linking the school improvement plan to the teacher appraisal process creates a system whereby all individuals…

  15. Memorial Hermann: high reliability from board to bedside.

    Science.gov (United States)

    Shabot, M Michael; Monroe, Douglas; Inurria, Juan; Garbade, Debbi; France, Anne-Claire

    2013-06-01

    In 2006 the Memorial Hermann Health System (MHHS), which includes 12 hospitals, began applying principles embraced by high reliability organizations (HROs). Three factors support its HRO journey: (1) aligned organizational structure with transparent management systems and compressed reporting processes; (2) Robust Process Improvement (RPI) with high-reliability interventions; and (3) cultural establishment, sustainment, and evolution. The Quality and Safety strategic plan contains three domains, each with a specific set of measures that provide goals for performance: (1) "Clinical Excellence;" (2) "Do No Harm;" and (3) "Saving Lives," as measured by the Serious Safety Event rate. MHHS uses a uniform approach to performance improvement--RPI, which includes Six Sigma, Lean, and change management, to solve difficult safety and quality problems. The 9 acute care hospitals provide multiple opportunities to integrate high-reliability interventions and best practices across MHHS. For example, MHHS partnered with the Joint Commission Center for Transforming Healthcare in its inaugural project to establish reliable hand hygiene behaviors, which improved MHHS's average hand hygiene compliance rate from 44% to 92% currently. Soon after compliance exceeded 85% at all 12 hospitals, the average rate of central line-associated bloodstream and ventilator-associated pneumonias decreased to essentially zero. MHHS's size and diversity require a disciplined approach to performance improvement and systemwide achievement of measurable success. The most significant cultural change at MHHS has been the expectation for 100% compliance with evidence-based quality measures and 0% incidence of patient harm.

  16. 75 FR 70712 - General Conference Committee of the National Poultry Improvement Plan; Reestablishment

    Science.gov (United States)

    2010-11-18

    ...] General Conference Committee of the National Poultry Improvement Plan; Reestablishment AGENCY: Animal and... Poultry Improvement Plan (Committee) for a 2-year period. The Secretary of Agriculture has determined that.... Rhorer, Senior Coordinator, National Poultry Improvement Plan, VS, APHIS, USDA, Suite 101, 1498 Klondike...

  17. 77 FR 1051 - General Conference Committee of the National Poultry Improvement Plan; Meeting

    Science.gov (United States)

    2012-01-09

    ...] General Conference Committee of the National Poultry Improvement Plan; Meeting AGENCY: Animal and Plant... the General Conference Committee of the National Poultry Improvement Plan. DATES: The meeting will be... INFORMATION CONTACT: Dr. C. Stephen Roney, Senior Coordinator, National Poultry Improvement Plan, VS, APHIS...

  18. Evaluation of Smart Grid Technologies Employed for System Reliability Improvement: Pacific Northwest Smart Grid Demonstration Experience

    Energy Technology Data Exchange (ETDEWEB)

    Agalgaonkar, Yashodhan P.; Hammerstrom, Donald J.

    2017-06-01

    The Pacific Northwest Smart Grid Demonstration (PNWSGD) was a smart grid technology performance evaluation project that included multiple U.S. states and cooperation from multiple electric utilities in the northwest region. One of the local objectives for the project was to achieve improved distribution system reliability. Toward this end, some PNWSGD utilities automated their distribution systems, including the application of fault detection, isolation, and restoration and advanced metering infrastructure. In light of this investment, a major challenge was to establish a correlation between implementation of these smart grid technologies and actual improvements of distribution system reliability. This paper proposes using Welch’s t-test to objectively determine and quantify whether distribution system reliability is improving over time. The proposed methodology is generic, and it can be implemented by any utility after calculation of the standard reliability indices. The effectiveness of the proposed hypothesis testing approach is demonstrated through comprehensive practical results. It is believed that wider adoption of the proposed approach can help utilities to evaluate a realistic long-term performance of smart grid technologies.

  19. Louisiana Airport System Plan Five-Year Capital Improvement Program.

    Science.gov (United States)

    1992-07-01

    The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...

  20. Coal-Powered Electric Generating Unit Efficiency and Reliability Dialogue: Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, Emmanuel [Energetics, Inc., Columbia, MD (United States)

    2018-02-01

    findings and research suggestions discussed at the event. Discussions at the workshop will aid DOE in developing a set of distinct initiatives that can be pursued by government and industry to realize promising technological pursuits. DOE plans to use the results of the Dialogue coupled with ongoing technical analysis of efficiency opportunities within the coal-fired fleet, and additional studies to develop a comprehensive strategy for capitalizing on thermal efficiency improvements. Expected Power Plant Efficiency Improvements include developing cost-effective, efficient, and reliable technologies for boilers, turbines, and sensors and controls to improve the reliability and efficiency of existing coal-based power plants. The Office of Fossil Energy at DOE plans to work with industry to develop knowledge pertaining to advanced technologies and systems that industry can subsequently develop. These technologies and systems will increase reliability, add operational flexibility and improve efficiency, thereby providing more robust power generation infrastructure. The following table lists the research suggestions and questions for further investigation that were identified by participants in each session of the dialogue.

  1. The Reliability of Anthropometric Measurements Used Preoperatively in Aesthetic Breast Surgery.

    Science.gov (United States)

    Isaac, Kathryn V; Murphy, Blake D; Beber, Brett; Brown, Mitchell

    2016-04-01

    Patient outcomes in aesthetic breast surgery are highly dependent on breast measurements used in preoperative planning. The purpose of this study is to determine the reliability of anthropometric breast measurements. Four raters measured 28 women using 7 measurements: sternal notch to nipple distance (Sn-N), nipple to midline (N-M), nipple to inframammary-fold distance under maximal stretch (N-IMF), breast base width (BW), soft tissue pinch thickness of the upper pole (STPT:UP), STPT at the inframammary fold (STPT:IMF), and anterior pull skin stretch (APSS). Reliability was assessed using intra-class correlation coefficients (ICCs). Inter-rater reliability was excellent for Sn-N, N-M, and BW (ICC = 0.94, 0.90, and 0.76, respectively) and was good for N-IMF (ICC = 0.70). The STPT:UP, STPT:IMF, and APSS measurements were not reliable between raters (ICC reliability was excellent for Sn-N, N-M, and BW for all raters (all ICC > 0.75). The N-IMF intra-rater reliability was excellent in senior raters (ICC > 0.75) and good in junior raters (ICC > 0.6). The STPT:UP, STPT:IMF, and APSS measurements showed fair or poor reliability for most raters (ICC reliable. Dynamic measurements including APSS, STPT:UP, and STUP:IMF are unreliable. N-IMF is the only reliable dynamic measurement, and its reliability improves with increasing clinical experience. The variable reliability of preoperative measurements must be considered in the planning of aesthetic breast surgery. 4 Diagnostic. © 2015 The American Society for Aesthetic Plastic Surgery, Inc. Reprints and permission: journals.permissions@oup.com.

  2. Improving Flood Management Planning in Thailand | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    According to World Bank estimates, this disaster caused US$46.5 billion in ... This project seeks to improve the Flood Management Master Plan, proposing ... New Dutch-Canadian funding for the Climate and Development Knowledge Network.

  3. Designing and Assessing the Validity and Reliability of the Hospital Readiness Assessment Tools to Conducting Quality Improvement Program

    Directory of Open Access Journals (Sweden)

    Kamal Gholipoor

    2016-09-01

    Full Text Available Background and objectives : Identifying the readiness of hospital and its strengths and weaknesses can be useful in developing appropriate planning and situation analyses and management to getting effective in clinical audit programs. The aim of this study was to design and assess the validity of the Hospital Readiness Assessment Tools to conduct quality improvement and clinical audit programs. Material and Methods: In this study, based on the results of a systematic review of literature, an initial questionnaire with 77 items was designed. Questionnaire content validity was reviewed by experts in the field of hospital management and quality improvement in Tabriz University of Medical Sciences. For this purpose, 20 questionnaires were sent to experts. Finally, 15 participants returned completed questionnaire. Questionnaire validity was reviewed and confirmed based on Content Validity Index and Content Validity Ratio. Questionnaire reliability was confirmed based on Cronbach's alpha index (α = 0.96 in a pilot study by participation of 30 hospital managers. Results: The results showed that the final questionnaire contains 54 questions as nine category as: data and information (9 items, teamwork (12 questions, resources (5 questions, patient and education (5, intervention design and implementation (5 questions, clinical audit management (4 questions, human resources (6 questions, evidence and standard (4 items and evaluation and feedback (4 items. The final questionnaire content validity index was 0.91 and final questionnaire Cronbach's alpha coefficient was 0.96. Conclusion: Considering the relative good validity and reliability of the designed tool in this study, it appears that the questionnaire can be used to identify and assess the readiness of hospitals for quality improvement and clinical audit program implementation

  4. Validation of Land Cover Products Using Reliability Evaluation Methods

    Directory of Open Access Journals (Sweden)

    Wenzhong Shi

    2015-06-01

    Full Text Available Validation of land cover products is a fundamental task prior to data applications. Current validation schemes and methods are, however, suited only for assessing classification accuracy and disregard the reliability of land cover products. The reliability evaluation of land cover products should be undertaken to provide reliable land cover information. In addition, the lack of high-quality reference data often constrains validation and affects the reliability results of land cover products. This study proposes a validation schema to evaluate the reliability of land cover products, including two methods, namely, result reliability evaluation and process reliability evaluation. Result reliability evaluation computes the reliability of land cover products using seven reliability indicators. Process reliability evaluation analyzes the reliability propagation in the data production process to obtain the reliability of land cover products. Fuzzy fault tree analysis is introduced and improved in the reliability analysis of a data production process. Research results show that the proposed reliability evaluation scheme is reasonable and can be applied to validate land cover products. Through the analysis of the seven indicators of result reliability evaluation, more information on land cover can be obtained for strategic decision-making and planning, compared with traditional accuracy assessment methods. Process reliability evaluation without the need for reference data can facilitate the validation and reflect the change trends of reliabilities to some extent.

  5. Advancements in valve technology and industry lessons lead to improved plant reliability and cost savings

    International Nuclear Information System (INIS)

    Sharma, V.; Kalsi, M.S.

    2005-01-01

    Plant reliability and safety hinges on the proper functioning of several valves. Recent advancements in valve technology have resulted in new analytical and test methods for evaluating and improving valve and actuator reliability. This is especially significant in critical service applications in which the economic impact of a valve failure on production, outage schedules and consequential damages far surpasses the initial equipment purchase price. This paper presents an overview of recent advances in valve technology driven by reliability concerns and cost savings objectives without comprising safety in the Nuclear Power Industry. This overview is based on over 27 years of experience in supporting US and International nuclear power utilities, and contributing to EPRI, and NSSS Owners' Groups in developing generic models/methodologies to address industry wide issues; performing design basis reviews; and implementing plant-wide valve reliability improvement programs. Various analytical prediction software and hardware solutions and training seminars are now available to implement valve programs covering power plants' lifecycle from the construction phase through life extension and power up rate. These tools and methodologies can enhance valve-engineering activities including the selection, sizing, proper application, condition monitoring, failure analysis, and condition based maintenance optimization with a focus on potential bad actors. This paper offers two such examples, the Kalsi Valve and Actuator Program (KVAP) and Check Valve Analysis and Prioritization (CVAP) [1-3, 8, 9, 11-13]. The advanced, validated torque prediction models incorporated into KVAP software for AOVs and MOVs have improved reliability of margin predictions and enabled cost savings through elimination of unwarranted equipment modifications. CVAP models provides a basis to prioritize the population of valves recommended for preventive maintenance, inspection and/or modification, allowing

  6. Evaluation and proposal of improvement for the measurement system in ATLAS

    International Nuclear Information System (INIS)

    Cho, Dong Woo; Kim, Jong Rok; Park, Jun Kwon

    2007-03-01

    The project independently evaluated the validities and reliability of measurement system in ATLAS, then proposed plans to improve the measurement system from evaluated results. For this objectives, we evaluated the design, technical backgrounds, verifying data of measurement system in ATLAS. From this evaluation, we proposed plans for improvement on parts which need improvement

  7. Active Thermal Control for Reliability Improvement of MOS-gated Power Devices

    DEFF Research Database (Denmark)

    Soldati, Alessandro; Concari, Carlo; Dossena, Fabrizio

    2017-01-01

    reliability and lifetime. These figures can then be improved, which eases the adoption of electrification in markets, such as transportation, where they are still below target values. The proposed ATC method leaves electric load parameters untouched, while acting dynamically on gate parameters, namely voltage...... and resistance. A model-predictive control (MPC) strategy is used to determine the most suitable parameters to use. Simulations of the control scheme are presented first, to predict the potential benefits on temperature swing amplitude, and the consequent improvements in terms of device lifetime are inferred...

  8. Improved reliability of residential heat pumps; Foerbaettrad driftsaekerhet hos villavaermepumpar

    Energy Technology Data Exchange (ETDEWEB)

    Haglund Stignor, Caroline; Larsson, Kristin; Jensen, Sara; Larsson, Johan; Berg, Johan; Lidbom, Peter; Rolfsman, Lennart

    2012-07-01

    Today, heat pump heating systems are common in Swedish single-family houses. Many owners are pleased with their installation, but statistics show that a certain number of heat pumps break every year, resulting in high costs for both insurance companies and owners. On behalf of Laensfoersaekringars Forskningsfond, SP Energy Technology has studied the cause of the most common failures for residential heat pumps. The objective of the study was to suggest what measures to be taken to reduce the number of failures, i.e. improving the reliability of heat pumps. The methods used were analysis of public failure statistics and sales statistics and interviews with heat pump manufacturers, installers, service representatives and assessors at Laensfoersaekringar. In addition, heat pump manuals have been examined and literature searches for various methods for durability tests have been performed. Based on the outcome from the interviews the most common failures were categorized by if they; 1. Could have been prevented by better operation and maintenance of the heat pump. 2. Caused by a poorly performed installation. 3. Could have been prevented if certain parameters had been measured, recorded and followed up. 4. Are due to poor quality of components or systems. However, the results show that many of the common failures fall into several different categories and therefore, different types of measures must be taken to improve the operational reliability of residential heat pumps. The interviews tell that failures often are caused by poor installation, neglected maintenance and surveillance, and poor quality of standard components or that components are used outside their declared operating range. The quality of the installations could be improved by increasing installers' knowledge about heat pumps and by requiring that an installation protocol shall be filled-in. It is also important that the owner of the heat pump performs the preventive maintenance recommended by the

  9. Improved reliability of residential heat pumps; Foerbaettrad driftsaekerhet hos villavaermepumpar

    Energy Technology Data Exchange (ETDEWEB)

    Haglund Stignor, Caroline; Larsson, Kristin; Jensen, Sara; Larsson, Johan; Berg, Johan; Lidbom, Peter; Rolfsman, Lennart

    2012-07-01

    Today, heat pump heating systems are common in Swedish single-family houses. Many owners are pleased with their installation, but statistics show that a certain number of heat pumps break every year, resulting in high costs for both insurance companies and owners. On behalf of Laensfoersaekringars Forskningsfond, SP Energy Technology has studied the cause of the most common failures for residential heat pumps. The objective of the study was to suggest what measures to be taken to reduce the number of failures, i.e. improving the reliability of heat pumps. The methods used were analysis of public failure statistics and sales statistics and interviews with heat pump manufacturers, installers, service representatives and assessors at Laensfoersaekringar. In addition, heat pump manuals have been examined and literature searches for various methods for durability tests have been performed. Based on the outcome from the interviews the most common failures were categorized by if they; 1. Could have been prevented by better operation and maintenance of the heat pump. 2. Caused by a poorly performed installation. 3. Could have been prevented if certain parameters had been measured, recorded and followed up. 4. Are due to poor quality of components or systems. However, the results show that many of the common failures fall into several different categories and therefore, different types of measures must be taken to improve the operational reliability of residential heat pumps. The interviews tell that failures often are caused by poor installation, neglected maintenance and surveillance, and poor quality of standard components or that components are used outside their declared operating range. The quality of the installations could be improved by increasing installers' knowledge about heat pumps and by requiring that an installation protocol shall be filled-in. It is also important that the owner of the heat pump performs the preventive maintenance recommended by the

  10. Failed fuel action plan guidelines: Special report

    International Nuclear Information System (INIS)

    1987-11-01

    The objective of this document is to provide a generic guideline that can be used to formulate a failed fuel action plan (FFAP) for specific application by a utility. This document is intended to be part of a comprehensive fuel reliability monitoring, management, and improvement program. The utilities may utilize this document as one resource in developing a failed fuel action plan. This document is not intended to be used as a failed fuel action plan standard. This document is intended to provide guidance on: management responsibilities; fuel performance parameters; cost/benefit analysis; action levels; long-term improvement methods; and data collection, analysis, and trending. 3 refs., 4 figs., 6 tabs

  11. Reliability-Based Design Optimization of Trusses with Linked-Discrete Design Variables using the Improved Firefly Algorithm

    Directory of Open Access Journals (Sweden)

    N. M. Okasha

    2016-04-01

    Full Text Available In this paper, an approach for conducting a Reliability-Based Design Optimization (RBDO of truss structures with linked-discrete design variables is proposed. The sections of the truss members are selected from the AISC standard tables and thus the design variables that represent the properties of each section are linked. Latin hypercube sampling is used in the evaluation of the structural reliability. The improved firefly algorithm is used for the optimization solution process. It was found that in order to use the improved firefly algorithm for efficiently solving problems of reliability-based design optimization with linked-discrete design variables; it needs to be modified as proposed in this paper to accelerate its convergence.

  12. Improving water services through inclusive planning | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2013-05-21

    May 21, 2013 ... ... with the municipality on a large-scale solid waste storage and recycling plant. ... As a result, not only were infrastructure and planning processes improved, but ... Clean water initiative in Peru led by former IDRC awardee.

  13. Improved Reliability of SiC Pressure Sensors for Long Term High Temperature Applications

    Science.gov (United States)

    Okojie, R. S.; Nguyen, V.; Savrun, E.; Lukco, D.

    2011-01-01

    We report advancement in the reliability of silicon carbide pressure sensors operating at 600 C for extended periods. The large temporal drifts in zero pressure offset voltage at 600 C observed previously were significantly suppressed to allow improved reliable operation. This improvement was the result of further enhancement of the electrical and mechanical integrity of the bondpad/contact metallization, and the introduction of studded bump bonding on the pad. The stud bump contact promoted strong adhesion between the Au bond pad and the Au die-attach. The changes in the zero offset voltage and bridge resistance over time at temperature were explained by the microstructure and phase changes within the contact metallization, that were analyzed with Auger electron spectroscopy (AES) and field emission scanning electron microscopy (FE-SEM).

  14. Learning to improve path planning performance

    International Nuclear Information System (INIS)

    Chen, Pang C.

    1995-04-01

    In robotics, path planning refers to finding a short. collision-free path from an initial robot configuration to a desired configuratioin. It has to be fast to support real-time task-level robot programming. Unfortunately, current planning techniques are still too slow to be effective, as they often require several minutes, if not hours of computation. To remedy this situation, we present and analyze a learning algorithm that uses past experience to increase future performance. The algorithm relies on an existing path planner to provide solutions to difficult tasks. From these solutions, an evolving sparse network of useful robot configurations is learned to support faster planning. More generally, the algorithm provides a speedup-learning framework in which a slow but capable planner may be improved both cost-wise and capability-wise by a faster but less capable planner coupled with experience. The basic algorithm is suitable for stationary environments, and can be extended to accommodate changing environments with on-demand experience repair and object-attached experience abstraction. To analyze the algorithm, we characterize the situations in which the adaptive planner is useful, provide quantitative bounds to predict its behavior, and confirm our theoretical results with experiments in path planning of manipulators. Our algorithm and analysis are sufficiently, general that they may also be applied to other planning domains in which experience is useful

  15. Reliability Evaluation of Service-Oriented Architecture Systems Considering Fault-Tolerance Designs

    Directory of Open Access Journals (Sweden)

    Kuan-Li Peng

    2014-01-01

    strategies. Sensitivity analysis of SOA at both coarse and fine grain levels is also studied, which can be used to efficiently identify the critical parts within the system. Two SOA system scenarios based on real industrial practices are studied. Experimental results show that the proposed SOA model can be used to accurately depict the behavior of SOA systems. Additionally, a sensitivity analysis that quantizes the effects of system structure as well as fault tolerance on the overall reliability is also studied. On the whole, the proposed reliability modeling and analysis framework may help the SOA system service provider to evaluate the overall system reliability effectively and also make smarter improvement plans by focusing resources on enhancing reliability-sensitive parts within the system.

  16. Photovoltaic module reliability improvement through application testing and failure analysis

    Science.gov (United States)

    Dumas, L. N.; Shumka, A.

    1982-01-01

    During the first four years of the U.S. Department of Energy (DOE) National Photovoltatic Program, the Jet Propulsion Laboratory Low-Cost Solar Array (LSA) Project purchased about 400 kW of photovoltaic modules for test and experiments. In order to identify, report, and analyze test and operational problems with the Block Procurement modules, a problem/failure reporting and analysis system was implemented by the LSA Project with the main purpose of providing manufacturers with feedback from test and field experience needed for the improvement of product performance and reliability. A description of the more significant types of failures is presented, taking into account interconnects, cracked cells, dielectric breakdown, delamination, and corrosion. Current design practices and reliability evaluations are also discussed. The conducted evaluation indicates that current module designs incorporate damage-resistant and fault-tolerant features which address field failure mechanisms observed to date.

  17. Improving the reliability of nuclear reprocessing by application of computers and mathematical modelling

    International Nuclear Information System (INIS)

    Gabowitsch, E.; Trauboth, H.

    1982-01-01

    After a brief survey of the present and expected future state of nuclear energy utilization, which should demonstrate the significance of nuclear reprocessing, safety and reliability aspects of nuclear reprocessing plants (NRP) are considered. Then, the principal possibilities of modern computer technology including computer systems architecture and application-oriented software for improving the reliability and availability are outlined. In this context, two information systems being developed at the Nuclear Research Center Karlsruhe (KfK) are briefly described. For design evaluation of certain areas of a large NRP mathematical methods and computer-aided tools developed, used or being designed by KfK are discussed. In conclusion, future research to be pursued in information processing and applied mathematics in support of reliable operation of NRP's is proposed. (Auth.)

  18. Reliability evaluation of deregulated electric power systems for planning applications

    International Nuclear Information System (INIS)

    Ehsani, A.; Ranjbar, A.M.; Jafari, A.; Fotuhi-Firuzabad, M.

    2008-01-01

    In a deregulated electric power utility industry in which a competitive electricity market can influence system reliability, market risks cannot be ignored. This paper (1) proposes an analytical probabilistic model for reliability evaluation of competitive electricity markets and (2) develops a methodology for incorporating the market reliability problem into HLII reliability studies. A Markov state space diagram is employed to evaluate the market reliability. Since the market is a continuously operated system, the concept of absorbing states is applied to it in order to evaluate the reliability. The market states are identified by using market performance indices and the transition rates are calculated by using historical data. The key point in the proposed method is the concept that the reliability level of a restructured electric power system can be calculated using the availability of the composite power system (HLII) and the reliability of the electricity market. Two case studies are carried out over Roy Billinton Test System (RBTS) to illustrate interesting features of the proposed methodology

  19. Quality of Context Enhancements and Cost Effective Radio over Fiber Network Planning

    DEFF Research Database (Denmark)

    Shawky, Ahmed Sherif Mahmoud

    In Communication networks today there is an endless quest for increased capacity and improved quality. With wireless systems being now popular worldwide for allowing users and devices to communicate and share information with each other irrespective of their location, the development of sustainable...... into dynamic context information reliability by developing models and online algorithms that ensure increased reliability for context information exchange. Eventually, the PhD looks into improving network planning by implementing an automated network planning model that takes advantage of both Radio over Fiber...... services. The increased number of mobile users puts a demand on today's networks in terms of application sensitivity, mobility and reliability. Mobile operators are offering various context-aware services and applications to the user. Today, mobile users are demanding access to dynamic context information...

  20. Suncor maintenance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Little, S. [Suncor Energy, Calgary, AB (Canada)

    2006-07-01

    Fleet maintenance and reliability at Suncor Energy was discussed in this presentation, with reference to Suncor Energy's primary and support equipment fleets. This paper also discussed Suncor Energy's maintenance and reliability standard involving people, processes and technology. An organizational maturity chart that graphed organizational learning against organizational performance was illustrated. The presentation also reviewed the maintenance and reliability framework; maintenance reliability model; the process overview of the maintenance and reliability standard; a process flow chart of maintenance strategies and programs; and an asset reliability improvement process flow chart. An example of an improvement initiative was included, with reference to a shovel reliability review; a dipper trip reliability investigation; bucket related failures by type and frequency; root cause analysis of the reliability process; and additional actions taken. Last, the presentation provided a graph of the results of the improvement initiative and presented the key lessons learned. tabs., figs.

  1. Software reliability and safety in nuclear reactor protection systems

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, J.D. [Lawrence Livermore National Lab., CA (United States)

    1993-11-01

    Planning the development, use and regulation of computer systems in nuclear reactor protection systems in such a way as to enhance reliability and safety is a complex issue. This report is one of a series of reports from the Computer Safety and Reliability Group, Lawrence Livermore that investigates different aspects of computer software in reactor National Laboratory, that investigates different aspects of computer software in reactor protection systems. There are two central themes in the report, First, software considerations cannot be fully understood in isolation from computer hardware and application considerations. Second, the process of engineering reliability and safety into a computer system requires activities to be carried out throughout the software life cycle. The report discusses the many activities that can be carried out during the software life cycle to improve the safety and reliability of the resulting product. The viewpoint is primarily that of the assessor, or auditor.

  2. Software reliability and safety in nuclear reactor protection systems

    International Nuclear Information System (INIS)

    Lawrence, J.D.

    1993-11-01

    Planning the development, use and regulation of computer systems in nuclear reactor protection systems in such a way as to enhance reliability and safety is a complex issue. This report is one of a series of reports from the Computer Safety and Reliability Group, Lawrence Livermore that investigates different aspects of computer software in reactor National Laboratory, that investigates different aspects of computer software in reactor protection systems. There are two central themes in the report, First, software considerations cannot be fully understood in isolation from computer hardware and application considerations. Second, the process of engineering reliability and safety into a computer system requires activities to be carried out throughout the software life cycle. The report discusses the many activities that can be carried out during the software life cycle to improve the safety and reliability of the resulting product. The viewpoint is primarily that of the assessor, or auditor

  3. Transmission reliability faces future challenges

    International Nuclear Information System (INIS)

    Beaty, W.

    1993-01-01

    The recently published Washington International Energy Group's 1993 Electric Utility Outlook states that nearly one-third (31 percent) of U.S. utility executives expect reliability to decrease in the near future. Electric power system stability is crucial to reliability. Stability analysis determines whether a system will stay intact under normal operating conditions, during minor disturbances such as load fluctuations, and during major disturbances when one or more parts of the system fails. All system elements contribute to reliability or the lack of it. However, this report centers on the transmission segment of the electric system. The North American Electric Reliability Council (NERC) says the transmission systems as planned will be adequate over the next 10 years. However, delays in building new lines and increasing demands for transmission services are serious concerns. Reliability concerns exist in the Mid-Continent Area Power Pool and the Mid-America Interconnected Network regions where transmission facilities have not been allowed to be constructed as planned. Portions of the transmission systems in other regions are loaded at or near their limits. NERC further states that utilities must be allowed to complete planned generation and transmission as scheduled. A reliable supply of electricity also depends on adhering to established operating criteria. Factors that could complicate operations include: More interchange schedules resulting from increased transmission services. Increased line loadings in portions of the transmission systems. Proliferation of non-utility generators

  4. Improved operational performance through the use of business planning tools

    International Nuclear Information System (INIS)

    Hoelscher, H.L.

    1996-01-01

    Improved operational performance at Point Beach Nuclear Plant is based on a focused business plan. Quantitative goals that compare past performance with the performance of potential competitors are the basis of the business plan. This establishes goals for the nuclear power business unit which support corporate goals. Strategies and objectives are then developed to meet the established goals. To continue support for these strategies and objectives, individual performance plans are developed for all management personnel. These performance management plans identify individual contributor actions to support the goals, and also provide periodic feedback for changes to better prioritize individual actions. Performance criteria are also established to measure progress toward achieving the goals. The author also has a program to provide incentives for improved performance based upon success of the organization in achieving established goals

  5. Improving treatment plan evaluation with automation

    Science.gov (United States)

    Covington, Elizabeth L.; Chen, Xiaoping; Younge, Kelly C.; Lee, Choonik; Matuszak, Martha M.; Kessler, Marc L.; Keranen, Wayne; Acosta, Eduardo; Dougherty, Ashley M.; Filpansick, Stephanie E.

    2016-01-01

    The goal of this work is to evaluate the effectiveness of Plan‐Checker Tool (PCT) which was created to improve first‐time plan quality, reduce patient delays, increase the efficiency of our electronic workflow, and standardize and automate the physics plan review in the treatment planning system (TPS). PCT uses an application programming interface to check and compare data from the TPS and treatment management system (TMS). PCT includes a comprehensive checklist of automated and manual checks that are documented when performed by the user as part of a plan readiness check for treatment. Prior to and during PCT development, errors identified during the physics review and causes of patient treatment start delays were tracked to prioritize which checks should be automated. Nineteen of 33 checklist items were automated, with data extracted with PCT. There was a 60% reduction in the number of patient delays in the six months after PCT release. PCT was successfully implemented for use on all external beam treatment plans in our clinic. While the number of errors found during the physics check did not decrease, automation of checks increased visibility of errors during the physics check, which led to decreased patient delays. The methods used here can be applied to any TMS and TPS that allows queries of the database. PACS number(s): 87.55.‐x, 87.55.N‐, 87.55.Qr, 87.55.tm, 89.20.Bb PMID:27929478

  6. School Improvement Plans and Student Learning in Jamaica

    Science.gov (United States)

    Lockheed, Marlaine; Harris, Abigail; Jayasundera, Tamara

    2010-01-01

    A school improvement program that provided support to poor-performing schools on the basis of needs identified in a school improvement plan was implemented in 72 government schools in Jamaica, from 1998 to 2005. In this independent evaluation of the program, we use propensity score matching to create, post hoc, a control group of schools that were…

  7. Introduction of composite reliability evaluation in power system operation planning; Introducao da confiabilidade composta no planejamento da operacao eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Schilling, M T; Gomes, P [ELETROBRAS, Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This paper gives an overview of an ongoing, detailed and first-hand investigation about the current reliability levels of the Brazilian power system, as seen from the electrical operation planning point-of-view. A set of practical results are presented and commented. (author) 41 refs., 4 figs., 4 tabs.

  8. Power electronics reliability analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Mark A.; Atcitty, Stanley

    2009-12-01

    This report provides the DOE and industry with a general process for analyzing power electronics reliability. The analysis can help with understanding the main causes of failures, downtime, and cost and how to reduce them. One approach is to collect field maintenance data and use it directly to calculate reliability metrics related to each cause. Another approach is to model the functional structure of the equipment using a fault tree to derive system reliability from component reliability. Analysis of a fictitious device demonstrates the latter process. Optimization can use the resulting baseline model to decide how to improve reliability and/or lower costs. It is recommended that both electric utilities and equipment manufacturers make provisions to collect and share data in order to lay the groundwork for improving reliability into the future. Reliability analysis helps guide reliability improvements in hardware and software technology including condition monitoring and prognostics and health management.

  9. Reliability Improvement of Power Converters by Means of Condition Monitoring of IGBT Modules

    DEFF Research Database (Denmark)

    Choi, Ui Min; Blaabjerg, Frede; Jørgensen, S.

    2017-01-01

    Power electronic systems have gradually gained an important status in a wide range of industrial applications such as renewable generation, motor drives, automotive, and railway transportation. Accordingly, recent research makes an effort to improve the reliability of power electronic systems...

  10. Improving of Business Planning Using the Method of Fuzzy Numbers

    Directory of Open Access Journals (Sweden)

    Iryna Kosteteska

    2016-03-01

    Full Text Available Purpose: Summarize the experience of using modern methods in the business plan with the application of economic and mathematical modeling. Methodology: Theoretical and methodological basis of the study is the basic principles of economic theory, agricultural economics and scientific research of leading home and foreign scholars on the theory of planning. Originality: This further justifies business planning processes in agriculture from the standpoint of raising economic protection of farmers. The methodology for assessing farm income for planned indicators through the application of fuzzy numbers method in business planning is improved.

  11. When daily planning improves employee performance: The importance of planning type, engagement, and interruptions.

    Science.gov (United States)

    Parke, Michael R; Weinhardt, Justin M; Brodsky, Andrew; Tangirala, Subrahmaniam; DeVoe, Sanford E

    2018-03-01

    Does planning for a particular workday help employees perform better than on other days they fail to plan? We investigate this question by identifying 2 distinct types of daily work planning to explain why and when planning improves employees' daily performance. The first type is time management planning (TMP)-creating task lists, prioritizing tasks, and determining how and when to perform them. We propose that TMP enhances employees' performance by increasing their work engagement, but that these positive effects are weakened when employees face many interruptions in their day. The second type is contingent planning (CP) in which employees anticipate possible interruptions in their work and plan for them. We propose that CP helps employees stay engaged and perform well despite frequent interruptions. We investigate these hypotheses using a 2-week experience-sampling study. Our findings indicate that TMP's positive effects are conditioned upon the amount of interruptions, but CP has positive effects that are not influenced by the level of interruptions. Through this study, we help inform workers of the different planning methods they can use to increase their daily motivation and performance in dynamic work environments. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  12. Improved reliability of wind turbine towers with active tuned mass dampers (ATMDs)

    Science.gov (United States)

    Fitzgerald, Breiffni; Sarkar, Saptarshi; Staino, Andrea

    2018-04-01

    Modern multi-megawatt wind turbines are composed of slender, flexible, and lightly damped blades and towers. These components exhibit high susceptibility to wind-induced vibrations. As the size, flexibility and cost of the towers have increased in recent years, the need to protect these structures against damage induced by turbulent aerodynamic loading has become apparent. This paper combines structural dynamic models and probabilistic assessment tools to demonstrate improvements in structural reliability when modern wind turbine towers are equipped with active tuned mass dampers (ATMDs). This study proposes a multi-modal wind turbine model for wind turbine control design and analysis. This study incorporates an ATMD into the tower of this model. The model is subjected to stochastically generated wind loads of varying speeds to develop wind-induced probabilistic demand models for towers of modern multi-megawatt wind turbines under structural uncertainty. Numerical simulations have been carried out to ascertain the effectiveness of the active control system to improve the structural performance of the wind turbine and its reliability. The study constructs fragility curves, which illustrate reductions in the vulnerability of towers to wind loading owing to the inclusion of the damper. Results show that the active controller is successful in increasing the reliability of the tower responses. According to the analysis carried out in this paper, a strong reduction of the probability of exceeding a given displacement at the rated wind speed has been observed.

  13. Role of recent research in improving check valve reliability at nuclear power plants

    International Nuclear Information System (INIS)

    Kalsi, M.S.; Horst, C.L.; Wang, J.K.; Sharma, V.

    1990-01-01

    Check valve failures at nuclear power plants in recent years have led to serious safety concerns, and caused extensive damage to other plant components which had a significant impact on plant availability. In order to understand the failure mechanism and improve the reliability of check valves, a systematic research effort was proposed by Kalsi Engineering, Inc. to U.S. Nuclear Regulatory Commission (NRC). The overall goal of the research was to develop models for predicting the performance and degradation of swing check valves in nuclear power plant systems so that appropriate preventive maintenance or design modifications can be performed to improve the reliability of check valves. Under Phase I of this research, a large matrix of tests was run with instrumented swing check valves to determine the stability of the disc under a variety of upstream flow disturbances, covering a wide range of disc stop positions and flow velocities in two different valve sizes. The goals of Phase II research were to develop predictive models which quantify the anticipated degradation of swing check valves that have flow disturbances closely upstream of the valve and are operating under flow velocities that do not result in full disc opening. This research allows the inspection/maintenance activities to be focussed on those check valves that are more likely to suffer premature degradation. The quantitative wear and fatigue prediction methodology can be used to develop a sound preventive maintenance program. The results of the research also show the improvements in check valve performance/reliability that can be achieved by certain modifications in the valve design

  14. Providing reliable equipment to IAEA through a low risk transition plan

    International Nuclear Information System (INIS)

    Green, L.; Weinstock, E.V.; Karlin, E.W.

    1988-01-01

    The development and production of safeguards equipment is a complex process containing many potential pitfalls between the conceptual design and its implementation in the field. The conditions for equipment use are especially demanding. At the same time, the consequences of failure may be serious. Repeated failure may result in the loss of credibility of safeguards. Expensive back up measures such as re-verification of inventories may be required. Inspectors may come to distrust the equipment. Finally, the expense of maintaining the equipment may be excessive. It is therefore essential that the process for bringing equipment for the conceptual stage to actual routine use minimizes the risk of producing equipment that is unsuitable for the job. Fortunately, approaches for accomplishing this have already been developed in both the industrial and commercial sectors. One such approach, the Low Risk Transition Plan (LRTP) is described to show it can be applied to the production of reliable safeguards equipment

  15. Improvement of Steam Generator Reliability for GEN-IV SFR

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Seong O; Kim Se Yun; Kim, Seok Hoon; Eoh, Jae Hyuk; Lee, Hyeong Yeon; Choi, Byung Seon

    2005-11-15

    The R and D items performed in this study were selected from the R and D task of ' Reliability improvement of Steam Generator' of GEN-IV SFR Component Design and BOP. Since this project deals with one of the most important issues for a GEN-IV SFR system, it needs to enhance the domestic technical backgrounds associated with the corresponding R and D items even for a very short period by 2005. This study provides the R and D results for i) Development of assessment methodology for dissimilar metal weld and ii) Development of multi-dimensional simulation methodology for a SWR event in a SFR steam generator.

  16. Improvement of Steam Generator Reliability for GEN-IV SFR

    International Nuclear Information System (INIS)

    Kim, Seong O; Kim Se Yun; Kim, Seok Hoon; Eoh, Jae Hyuk; Lee, Hyeong Yeon; Choi, Byung Seon

    2005-11-01

    The R and D items performed in this study were selected from the R and D task of ' Reliability improvement of Steam Generator' of GEN-IV SFR Component Design and BOP. Since this project deals with one of the most important issues for a GEN-IV SFR system, it needs to enhance the domestic technical backgrounds associated with the corresponding R and D items even for a very short period by 2005. This study provides the R and D results for i) Development of assessment methodology for dissimilar metal weld and ii) Development of multi-dimensional simulation methodology for a SWR event in a SFR steam generator

  17. Application of reliability worth concepts in power system operational planning

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Silva, A.M. Leite da [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Pereira, M V.F. [Power System Research (PSR), Inc., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This work describes the application of a new methodology for calculating total system interruption costs in power system operational planning. Some important operational aspects are discussed: chronological load curves, customer damage functions for each consumer class, maintenance scheduling and non-exponential repair times. It is also presented the calculation of the probability distribution of the system interruption cost to improve the decision making process associated with alternative operational strategies. The Brazilian Southeastern system is used to illustrate all previous applications. (author) 24 refs., 8 figs., 4 tabs.

  18. Improved reliability, maintainability and safety through elastomer upgrading

    International Nuclear Information System (INIS)

    Wensel, R.; Wittich, K.C.

    1995-01-01

    Equipment in nuclear plants has historically contained whatever elastomer each component supplier traditionally used for corresponding non-nuclear service. The resulting proliferation of elastomer compounds, many of which are far from optimal for the service conditions (e.g., pressure, temperature, radiation, etc.), has multiplied the costs to provide station reliability, maintainability and safety. Cost-effective improvements are being achieved in CANDU plants by upgrading and standardizing on a handful of high performing elastomer compounds. These upgraded materials offer significant gains in service life over the materials they replace (often by factors of 2 or more). This rationalization of elastomer compounds also facilitates the EQ process for safety-related equipment. Detailed test data on aging is currently being generated for these specific elastomers, encompassing the conditions and media (air, water, oil) common in CANDU service. Two key elements characterize this testing. First, each result is specific to the compound used in the test, and second, it is specific to the tested failure mode (e.g., compression set, extrusion, fracture, etc.). Having fewer, but more thoroughly tested compounds, avoids the penalty (associated with poorly characterized materials) of having to replace parts prematurely because of conservatism, while maintaining safe, reliable service. This paper provides an overview of this approach covering: the benefits of compound rationalization; and the how and why of establishing relevant failure criteria; appropriate quality assurance to maintain EQ; procurement, storage and handling guidelines; and monitoring and predicting in-service degradation. (author)

  19. Airport Capital Improvement Plan : stewardship for airport development

    Science.gov (United States)

    1997-09-01

    This document summarizes efforts of the Federal Aviation Administration (FAA) Office : of the Associate Administrator for Airports to implement the concept of Airport Capital : Improvement Planning (ACIP). It is based on the experiences of the FAA's ...

  20. 77 FR 42257 - General Conference Committee of the National Poultry Improvement Plan; Solicitation for Membership

    Science.gov (United States)

    2012-07-18

    ...] General Conference Committee of the National Poultry Improvement Plan; Solicitation for Membership AGENCY... regional membership for the General Conference Committee of the National Poultry Improvement Plan. DATES... INFORMATION CONTACT: Dr. C. Stephen Roney, Senior Coordinator, National Poultry Improvement Plan, VS, APHIS...

  1. Reliability of infarct volumetry: Its relevance and the improvement by a software-assisted approach.

    Science.gov (United States)

    Friedländer, Felix; Bohmann, Ferdinand; Brunkhorst, Max; Chae, Ju-Hee; Devraj, Kavi; Köhler, Yvette; Kraft, Peter; Kuhn, Hannah; Lucaciu, Alexandra; Luger, Sebastian; Pfeilschifter, Waltraud; Sadler, Rebecca; Liesz, Arthur; Scholtyschik, Karolina; Stolz, Leonie; Vutukuri, Rajkumar; Brunkhorst, Robert

    2017-08-01

    Despite the efficacy of neuroprotective approaches in animal models of stroke, their translation has so far failed from bench to bedside. One reason is presumed to be a low quality of preclinical study design, leading to bias and a low a priori power. In this study, we propose that the key read-out of experimental stroke studies, the volume of the ischemic damage as commonly measured by free-handed planimetry of TTC-stained brain sections, is subject to an unrecognized low inter-rater and test-retest reliability with strong implications for statistical power and bias. As an alternative approach, we suggest a simple, open-source, software-assisted method, taking advantage of automatic-thresholding techniques. The validity and the improvement of reliability by an automated method to tMCAO infarct volumetry are demonstrated. In addition, we show the probable consequences of increased reliability for precision, p-values, effect inflation, and power calculation, exemplified by a systematic analysis of experimental stroke studies published in the year 2015. Our study reveals an underappreciated quality problem in translational stroke research and suggests that software-assisted infarct volumetry might help to improve reproducibility and therefore the robustness of bench to bedside translation.

  2. Accountability for enhanced reliability for ALWRs

    International Nuclear Information System (INIS)

    Sanford, M.O.

    1993-01-01

    Advanced nuclear units must compete with alternative generating technologies for inclusion in a utility's future planning. Operating reliability, or capacity factor, and operating cost are important factors in this competition. The ALWR Utility Requirements Document has established targets for both ALWR Capacity Factors (87%) and O ampersand M costs (13--16 mils/KWh), but recognizes that these O ampersand M cost targets need to be lower. The recently published USCEA cost study estimates O ampersand M costs on the order of 6 mils/kw. Meeting, or better yet improving on, these targets is essential for nuclear to be competitive. A number of specific items have been included in the Utility Requirements Document to improve reliability based on experience with operating units. For the most part, these include either avoiding known problems, or simplifying the design. Vendor design organizations are generally complying with the URD and this is expected to produce an improved design both in terms of reliability and ease of operation and maintenance. As one embarks on First-of-a-Kind Engineering (FOAKE), however, it is useful to revisit the issue of responsibility for assuring that reliability improvements are embodied in the new plant designs. The vendor design team must ultimately assume this responsibility. While utility operating and maintenance experience is an essential input to an effective design, decisions on how best to design for this experience remain a designer function. This poses a dilemma for the designer in that such decisions seem to invariably require a trade-off between the capital cost of the product and the ultimate O ampersand M cost. Since traditionally only capital cost has had a direct measurable impact on the vendor, it has received the greater weight. A more appropriate balance must be struck in the future, however, for nuclear to be competitive. Utilities must demand a balance in the design of ALWRs which truly reflects the total cost of power

  3. Good performance in Japan is proof of continuing safety and reliability improvement practice

    International Nuclear Information System (INIS)

    Sumi, Y.

    1987-01-01

    Nuclear power is a vital energy supply source for both security and economy for such countries as Japan whose sources of energy are dependent on imported materials. This is the very reason why Japan gives her national priority to the improvement of nuclear power safety and reliability. As of the end of 1986, total nuclear power capacity owned and operated by private utility companies in Japan amounted to 24521 MW with 32 units sharing -- 19% of the total generating capacity. Moreover, during 1986 these units scored a remarkably high capacity factor of 76.2% and shared almost 28% of the nationwide electric power production, thereby contributing to a considerable saving of imported sources of energy. This outstanding record has been achieved by the parties concerned who dedicated themselves to furthering nuclear plant safety and reliability improvement. In this connection, this paper summarizes those key factors contributing to the good nuclear power plant performance of the Kansai Electric Power Company

  4. The planning and management system of the low level radioactive waste transportation

    International Nuclear Information System (INIS)

    Tanaka, K.; Yoshida, K.; Miyamoto, J.; Sanui, T.; Noura, T.; Kitanishi, K.; Nara, S.

    1993-01-01

    Nuclear Fuel Transport Co, Ltd. (hereafter called NFT) was the first in Japan to transport low-level radioactive waste (LLW). It is now engaged in preparatory operations with the slogan 'Improved Safety and Reliability' and is introducing advanced mechanization systems to provide safety and reliability in software management such as transportation planning and transportation information management. The following is an introduction of these systems, which provide overall support in transportation planning determination and transportation management operations related to the LLW transportation cycle. (J.P.N.)

  5. The impact of intrinsic motivation on session attendance and reliable cognitive improvement in cognitive remediation in schizophrenia.

    Science.gov (United States)

    Bryce, S D; Lee, S J; Ponsford, J L; Lawrence, R J; Tan, E J; Rossell, S L

    2018-06-20

    Cognitive remediation (CR) is considered a potentially effective method of improving cognitive function in people with schizophrenia. Few studies, however, have explored the role of intrinsic motivation on treatment utilization or training outcomes in CR in this population. This study explored the impact of task-specific intrinsic motivation on attendance and reliable cognitive improvement in a controlled trial comparing CR with a computer game (CG) playing control. Forty-nine participants with schizophrenia or schizoaffective disorder, allocated to 10 weeks of group-based CR (n = 25) or CG control (n = 24), provided complete outcome data at baseline. Forty-three participants completed their assigned intervention. Cognition, psychopathology and intrinsic motivation were measured at baseline and end-treatment. Regression analyses explored the relative contribution of baseline motivation and other clinical factors to session attendance as well as the association of baseline and change in intrinsic motivation with the odds of reliable cognitive improvement (calculated using reliable change indices). Baseline reports of perceived program value were the only significant multivariable predictor of session attendance when including global cognition and psychiatric symptomatology. The odds of reliable cognitive improvement significantly increased with greater improvements in program interest and value from baseline to end-treatment. Motivational changes over time were highly variable between participants. Task-specific intrinsic motivation in schizophrenia may represent an important patient-related factor that contributes to session attendance and cognitive improvements in CR. Regular evaluation and enhancement of intrinsic motivation in cognitively enhancing interventions may optimize treatment engagement and the likelihood of meaningful training outcomes. Copyright © 2018 Elsevier B.V. All rights reserved.

  6. Scoring haemophilic arthropathy on X-rays: improving inter- and intra-observer reliability and agreement using a consensus atlas

    Energy Technology Data Exchange (ETDEWEB)

    Foppen, Wouter; Schaaf, Irene C. van der; Beek, Frederik J.A. [University Medical Center Utrecht, Department of Radiology (Netherlands); Verkooijen, Helena M. [University Medical Center Utrecht, Department of Radiology (Netherlands); University Medical Center Utrecht, Julius Center for Health Sciences and Primary Care, Utrecht (Netherlands); Fischer, Kathelijn [University Medical Center Utrecht, Julius Center for Health Sciences and Primary Care, Utrecht (Netherlands); University Medical Center Utrecht, Van Creveldkliniek, Department of Hematology, Utrecht (Netherlands)

    2016-06-15

    The radiological Pettersson score (PS) is widely applied for classification of arthropathy to evaluate costly haemophilia treatment. This study aims to assess and improve inter- and intra-observer reliability and agreement of the PS. Two series of X-rays (bilateral elbows, knees, and ankles) of 10 haemophilia patients (120 joints) with haemophilic arthropathy were scored by three observers according to the PS (maximum score 13/joint). Subsequently, (dis-)agreement in scoring was discussed until consensus. Example images were collected in an atlas. Thereafter, second series of 120 joints were scored using the atlas. One observer rescored the second series after three months. Reliability was assessed by intraclass correlation coefficients (ICC), agreement by limits of agreement (LoA). Median Pettersson score at joint level (PS{sub joint}) of affected joints was 6 (interquartile range 3-9). Using the consensus atlas, inter-observer reliability of the PS{sub joint} improved significantly from 0.94 (95 % confidence interval (CI) 0.91-0.96) to 0.97 (CI 0.96-0.98). LoA improved from ±1.7 to ±1.1 for the PS{sub joint}. Therefore, true differences in arthropathy were differences in the PS{sub joint} of >2 points. Intra-observer reliability of the PS{sub joint} was 0.98 (CI 0.97-0.98), intra-observer LoA were ±0.9 points. Reliability and agreement of the PS improved by using a consensus atlas. (orig.)

  7. Supply chain solutions to improve the distribution of antiretroviral ...

    African Journals Online (AJOL)

    Recommendations to address the problems include: Implementing a supply chain planning and design process; improving inventory management and warehousing practices; implementing more effective and reliable distribution and transportation processes; as well as improving supply chain coordination and overall ...

  8. 76 FR 66057 - North American Electric Reliability Corporation; Order Approving Regional Reliability Standard

    Science.gov (United States)

    2011-10-25

    ... Reliability Standard that is necessitated by a physical difference in the Bulk-Power System.\\7\\ \\7\\ Order No... Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g... electric system event analyses and thereby improve system reliability by promoting improved system design...

  9. Improving the reliability of fuel Enusa; Mejora de la fiabilidad del combustible en Enusa

    Energy Technology Data Exchange (ETDEWEB)

    Choithramani, S.; Quecedo, M.

    2015-07-01

    ENUSA is committed to providing our customers with fuel designs that meet their needs for operational efficiency, power, energy, performance and reliability. ENUSAs current fuel designs, covering BWR and PWR technologies, incorporate highest performance with proven reliability features developed along nuclear power operation history. As of January 2015, ENUSA has manufactured more than 20.000 fuel assemblies (around half BWR and half PWR), with operating conditions reflecting varying reactor power densities, cycle lengths, operating strategies and water chemistry environments. This experience brings the knowledge to model our fuel behavior and acts as the principal instrument to identify and characterize the failure mechanisms of our fuel. Based on the information obtained from all this years of operation, ENUSA has progressively developed and implemented numerous mitigating actions identified upon the knowledge on failure mechanisms, which are the bases for the fuel reliability improvement program. Contemporaneously to this implementation, a positive trend on ENUSA fuel reliability has been observed. (Author)

  10. Engineering, maintenance, and initiatives to improve LAMPF beam availability and system reliability

    International Nuclear Information System (INIS)

    Harris, H.W.; DeHaven, R.A.; Hart, V.E.; Parsons, W.M.; Sturrock, J.C.

    1992-01-01

    Two different requirements are driving engineering studies and hardware development to improve LAMPF. The first is concerned with component and system improvements to increase beam availability during the LAMPF production cycle. Hardware changes in RF, power supplies, and magnets are being implemented to increase mean time between failure and reduce time to replace or repair failed units. A joint LAMPF-Industry project is on-going to improve reliability of RF components. A component test stand is being refurbished to include significant development capability. The second approach includes several changes that will increase the duty factor of the existing accelerator. Major changes are being evaluated for replacing the front end of the accelerator. Other changes improving the high brightness capability could result in a new performance plateau for LAMPF. 2 refs., 2 figs

  11. 78 FR 58492 - Generator Verification Reliability Standards

    Science.gov (United States)

    2013-09-24

    ... power capability that is available for planning models and bulk electric system reliability assessments... of generator equipment needed to support Bulk-Power System reliability and enhance coordination of... support Bulk-Power System reliability and will ensure that accurate data is verified and made available...

  12. The use of discrete-event simulation modelling to improve radiation therapy planning processes.

    Science.gov (United States)

    Werker, Greg; Sauré, Antoine; French, John; Shechter, Steven

    2009-07-01

    The planning portion of the radiation therapy treatment process at the British Columbia Cancer Agency is efficient but nevertheless contains room for improvement. The purpose of this study is to show how a discrete-event simulation (DES) model can be used to represent this complex process and to suggest improvements that may reduce the planning time and ultimately reduce overall waiting times. A simulation model of the radiation therapy (RT) planning process was constructed using the Arena simulation software, representing the complexities of the system. Several types of inputs feed into the model; these inputs come from historical data, a staff survey, and interviews with planners. The simulation model was validated against historical data and then used to test various scenarios to identify and quantify potential improvements to the RT planning process. Simulation modelling is an attractive tool for describing complex systems, and can be used to identify improvements to the processes involved. It is possible to use this technique in the area of radiation therapy planning with the intent of reducing process times and subsequent delays for patient treatment. In this particular system, reducing the variability and length of oncologist-related delays contributes most to improving the planning time.

  13. Common and Critical Components Among Community Health Assessment and Community Health Improvement Planning Models.

    Science.gov (United States)

    Pennel, Cara L; Burdine, James N; Prochaska, John D; McLeroy, Kenneth R

    Community health assessment and community health improvement planning are continuous, systematic processes for assessing and addressing health needs in a community. Since there are different models to guide assessment and planning, as well as a variety of organizations and agencies that carry out these activities, there may be confusion in choosing among approaches. By examining the various components of the different assessment and planning models, we are able to identify areas for coordination, ways to maximize collaboration, and strategies to further improve community health. We identified 11 common assessment and planning components across 18 models and requirements, with a particular focus on health department, health system, and hospital models and requirements. These common components included preplanning; developing partnerships; developing vision and scope; collecting, analyzing, and interpreting data; identifying community assets; identifying priorities; developing and implementing an intervention plan; developing and implementing an evaluation plan; communicating and receiving feedback on the assessment findings and/or the plan; planning for sustainability; and celebrating success. Within several of these components, we discuss characteristics that are critical to improving community health. Practice implications include better understanding of different models and requirements by health departments, hospitals, and others involved in assessment and planning to improve cross-sector collaboration, collective impact, and community health. In addition, federal and state policy and accreditation requirements may be revised or implemented to better facilitate assessment and planning collaboration between health departments, hospitals, and others for the purpose of improving community health.

  14. Recommended Resources for Planning to Evaluate Program Improvement Efforts (Including the SSIP)

    Science.gov (United States)

    National Center for Systemic Improvement at WestEd, 2015

    2015-01-01

    This document provides a list of recommended existing resources for state Part C and Part B 619 staff and technical assistance (TA) providers to utilize to support evaluation planning for program improvement efforts (including the State Systemic Improvement Plan, SSIP). There are many resources available related to evaluation and evaluation…

  15. Developing methods for establishing improved plant reliability

    International Nuclear Information System (INIS)

    Zebroski, E.L.; Lapides, M.E.; Johnson, L.

    1976-01-01

    The current average capacity factor for nuclear electric generating facilities is approximately 60 percent, virtually the same as that for large, modern fossil-fired units. There is a clear cost advantage for nuclear electrical generation in comparison to coal-fired units at a common performance level. Because of the accelerated increase in capital and fuel costs of coal-fired units, the nuclear units will usually exhibit a cost advantage even when operating at lower capacity factor values. The incentives for improvement follow from the utility objectives to provide electricity at the most economical rates possible and are reflected in reduced system fuel costs and capital requirements. These objectives require maximizing the productivity of existing or planned investments in nuclear generation. The requirements are to: (1) achieve and sustain the highest capacity factor consistent with each utility's electric transmission system configuration and demand; (2) accelerate the rate of attainment of operational ''maturity'' of new generation; and (3) avoid low-probability but large-consequence forced-outage events. Nuclear unit productivity improvement involves utilities, regulatory agencies and industrial and government research and development organizations; the efforts appropriate to each organization were identified in a previous study. Since no foreseeable set of warranties begins to cover the consequential costs of low performance, the greatest incentive for improvement rests with each individual utility. The paper addresses the methodology and information sources for productivity actions by utilities during unit procurement and design phases

  16. Improving the reliability of fishery predictions under climate change

    DEFF Research Database (Denmark)

    Brander, Keith

    2015-01-01

    The increasing number of publications assessing impacts of climate change on marine ecosystems and fisheries attests to rising scientific and public interest. A selection of recent papers, dealing more with biological than social and economic aspects, is reviewed here, with particular attention...... to the reliability of projections of climate impacts on future fishery yields. The 2014 Intergovernmental Panel on Climate Change (IPCC) report expresses high confidence in projections that mid- and high-latitude fish catch potential will increase by 2050 and medium confidence that low-latitude catch potential...... understanding of climate impacts, such as how to improve coupled models from physics to fish and how to strengthen confidence in analysis of time series...

  17. Ways of improving the quality of planning radiotherapy with modulated intensity

    International Nuclear Information System (INIS)

    Khvorostenko, M.I.; Kikhtenko, I.N.; Khvorostenko, Yu.M.; Volokitin, S.V.; Sklyar, N.V.

    2017-01-01

    3D planning standards do not exclude the presence of sections of the tumor with absorbed dose less than planned, which is considered as a prerequisite for relapse. To improve radiation therapy outcomes in cancer patients through the enhancing (intensity-modulated radiation therapy (IMRT) radiation planning quality, identifying areas of the tumor with minimal optical density exposed to lower absorbed dose in comparison with the planned one and assessment of the ways to eliminate it. Due to identified locations with a minimum optical density and the absorbed dose lower than the planned one, the ''resale'' was carried out. It was aimed to achieve the values recorded in the plan. The percentage of coverage isodose GTV and PTV was increased; on the area, where the total focal dose was lower than the planned, the dose absorbed was increased in comparison with the recorded one. Assessment of the tumor areas with minimal optical density makes it possible to detect areas with likely lower value of the total focal dose in comparison with the target on; correction of the total focal dose in these areas will improve the quality of radiation therapy.

  18. Combination of AC Transmission Expansion Planning and Reactive Power Planning in the restructured power system

    International Nuclear Information System (INIS)

    Hooshmand, Rahmat-Allah; Hemmati, Reza; Parastegari, Moein

    2012-01-01

    Highlights: ► To overcome the disadvantages of DC model in Transmission Expansion Planning, AC model should be used. ► The Transmission Expansion Planning associated with Reactive Power Planning results in fewer new transmission lines. ► Electricity market concepts should be considered in Transmission Expansion Planning problem. ► Reliability aspects should be considered in Transmission Expansion Planning problem. ► Particle Swarm Optimization is a suitable optimization method to solve Transmission Expansion Planning problem. - Abstract: Transmission Expansion Planning (TEP) is an important issue in power system studies. It involves decisions on location and number of new transmission lines. Before deregulation of the power system, the goal of TEP problem was investment cost minimization. But in the restructured power system, nodal prices, congestion management, congestion surplus and so on, have been considered too. In this paper, an AC model of TEP problem (AC-TEP) associated with Reactive Power Planning (RPP) is presented. The goals of the proposed planning problem are to minimize investment cost and maximize social benefit at the same time. In the proposed planning problem, in order to improve the reliability of the system the Expected Energy Not Supplied (EENS) index of the system is limited by a constraint. For this purpose, Monte Carlo simulation method is used to determine the EENS. Particle Swarm Optimization (PSO) method is used to solve the proposed planning problem which is a nonlinear mixed integer optimization problem. Simulation results on Garver and RTS systems verify the effectiveness of the proposed planning problem for reduction of the total investment cost, EENS index and also increasing social welfare of the system.

  19. Linking Quality Assurance to Performance Improvement to Produce a High Reliability Organization

    International Nuclear Information System (INIS)

    Silvey, Andrea B.; Warrick, Louise H.

    2008-01-01

    Three basic change management models are currently used in healthcare to produce and sustain quality improvement. We have presented the context to determine where any particular organization stands within these paradigms. We also have introduced a change-management tool used to assess, plan, and monitor leadership effort and commitment to quality improvement and culture change activities, tracked as 'momentum for change.' This 'momentum' is measured at eight discrete levels, from recognizing a performance gap to officially implementing changes intended to improve quality

  20. 78 FR 40625 - National School Lunch Program: Direct Certification Continuous Improvement Plans Required by the...

    Science.gov (United States)

    2013-07-08

    ... National School Lunch Program: Direct Certification Continuous Improvement Plans Required by the Healthy... Continuous Improvement Plans Required by the Healthy, Hunger-Free Kids Act of 2010'' on February 22, 2013... performance benchmarks and to develop and implement continuous improvement plans if they fail to do so. The...

  1. Improving treatment planning accuracy through multimodality imaging

    International Nuclear Information System (INIS)

    Sailer, Scott L.; Rosenman, Julian G.; Soltys, Mitchel; Cullip, Tim J.; Chen, Jun

    1996-01-01

    the patient's initial fields and boost, respectively. Case illustrations are shown. Conclusions: We have successfully integrated multimodality imaging into our treatment-planning system, and its routine use is increasing. Multimodality imaging holds out the promise of improving treatment planning accuracy and, thus, takes maximum advantage of three dimensional treatment planning systems.

  2. Assessing motivation for work environment improvements: internal consistency, reliability and factorial structure.

    Science.gov (United States)

    Hedlund, Ann; Ateg, Mattias; Andersson, Ing-Marie; Rosén, Gunnar

    2010-04-01

    Workers' motivation to actively take part in improvements to the work environment is assumed to be important for the efficiency of investments for that purpose. That gives rise to the need for a tool to measure this motivation. A questionnaire to measure motivation for improvements to the work environment has been designed. Internal consistency and test-retest reliability of the domains of the questionnaire have been measured, and the factorial structure has been explored, from the answers of 113 employees. The internal consistency is high (0.94), as well as the correlation for the total score (0.84). Three factors are identified accounting for 61.6% of the total variance. The questionnaire can be a useful tool in improving intervention methods. The expectation is that the tool can be useful, particularly with the aim of improving efficiency of companies' investments for work environment improvements. Copyright 2010 Elsevier Ltd. All rights reserved.

  3. Utilizing clad piping to improve process plant piping integrity, reliability, and operations

    International Nuclear Information System (INIS)

    Chakravarti, B.

    1996-01-01

    During the past four years carbon steel piping clad with type 304L (UNS S30403) stainless steel has been used to solve the flow accelerated corrosion (FAC) problem in nuclear power plants with exceptional success. The product is designed to allow ''like for like'' replacement of damaged carbon steel components where the carbon steel remains the pressure boundary and type 304L (UNS S30403) stainless steel the corrosion allowance. More than 3000 feet of piping and 500 fittings in sizes from 6 to 36-in. NPS have been installed in the extraction steam and other lines of these power plants to improve reliability, eliminate inspection program, reduce O and M costs and provide operational benefits. This concept of utilizing clad piping in solving various corrosion problems in industrial and process plants by conservatively selecting a high alloy material as cladding can provide similar, significant benefits in controlling corrosion problems, minimizing maintenance cost, improving operation and reliability to control performance and risks in a highly cost effective manner. This paper will present various material combinations and applications that appear ideally suited for use of the clad piping components in process plants

  4. How Case-Based Reasoning on e-Community Knowledge Can Be Improved Thanks to Knowledge Reliability

    OpenAIRE

    Gaillard , Emmanuelle; Lieber , Jean; Nauer , Emmanuel; Cordier , Amélie

    2014-01-01

    International audience; This paper shows that performing case-based reasoning (CBR) on knowledge coming from an e-community is improved by taking into account knowledge reliability. MKM (meta-knowledge model) is a model for managing reliability of the knowledge units that are used in the reasoning process. For this, MKM uses meta-knowledge such as belief, trust and reputation, about knowledge units and users. MKM is used both to select relevant knowledge to conduct the reasoning process, and ...

  5. Reliability considerations in long-life outer planet spacecraft system design

    Science.gov (United States)

    Casani, E. K.

    1975-01-01

    A Mariner Jupiter/Saturn mission has been planned for 1977. System reliability questions are discussed, taking into account the actual and design lifetime, causes of mission termination, in-flight failures and their consequences for the mission, and the use of redundancy to avoid failures. The design process employed optimizes the use of proven subsystem and system designs and then makes the necessary improvements to increase the lifetime as required.

  6. Superintendents' Perceptions of the School Improvement Planning Process in the Southeastern USA

    Science.gov (United States)

    Dunaway, David M.; Bird, James J.; Wang, Chuang; Hancock, Dawson

    2014-01-01

    The purpose of this study of school improvement planning in the southeastern USA was to establish the current view of the process through the eyes of the district superintendents. The answers to the questions were consistently mixed. Generally, the presence of school improvement planning is prevalent in the large majority of districts. However,…

  7. Perceptions of the Purpose and Value of the School Improvement Plan Process

    Science.gov (United States)

    Dunaway, David M.; Kim, Do-Hong; Szad, Elizabeth R.

    2012-01-01

    The purpose of this research was to determine how teachers and administrators in a successful North Carolina district perceived the purpose and value of a school improvement plan (SIP) and the planning process. The SIP is the accepted best practice for school-wide improvement, and the perceptions of the purpose and value of the process…

  8. Evaluating School Improvement Plans and Their Affect on Academic Performance

    Science.gov (United States)

    Fernandez, Kenneth E.

    2011-01-01

    The development of a school improvement plan (SIP) has become an integral part of many school reform efforts. However, there are almost no studies that empirically examine the effectiveness of SIPs. The few studies examining the planning activities of organizations have generally focused on the private sector and have not provided clear or…

  9. Improvement of human reliability analysis method for PRA

    International Nuclear Information System (INIS)

    Tanji, Junichi; Fujimoto, Haruo

    2013-09-01

    It is required to refine human reliability analysis (HRA) method by, for example, incorporating consideration for the cognitive process of operator into the evaluation of diagnosis errors and decision-making errors, as a part of the development and improvement of methods used in probabilistic risk assessments (PRAs). JNES has been developed a HRA method based on ATHENA which is suitable to handle the structured relationship among diagnosis errors, decision-making errors and operator cognition process. This report summarizes outcomes obtained from the improvement of HRA method, in which enhancement to evaluate how the plant degraded condition affects operator cognitive process and to evaluate human error probabilities (HEPs) which correspond to the contents of operator tasks is made. In addition, this report describes the results of case studies on the representative accident sequences to investigate the applicability of HRA method developed. HEPs of the same accident sequences are also estimated using THERP method, which is most popularly used HRA method, and comparisons of the results obtained using these two methods are made to depict the differences of these methods and issues to be solved. Important conclusions obtained are as follows: (1) Improvement of HRA method using operator cognitive action model. Clarification of factors to be considered in the evaluation of human errors, incorporation of degraded plant safety condition into HRA and investigation of HEPs which are affected by the contents of operator tasks were made to improve the HRA method which can integrate operator cognitive action model into ATHENA method. In addition, the detail of procedures of the improved method was delineated in the form of flowchart. (2) Case studies and comparison with the results evaluated by THERP method. Four operator actions modeled in the PRAs of representative BWR5 and 4-loop PWR plants were selected and evaluated as case studies. These cases were also evaluated using

  10. A Step by Step Approach for Evaluating the Reliability of the Main Engine Lube Oil System for a Ship's Propulsion System

    Directory of Open Access Journals (Sweden)

    Mohan Anantharaman

    2014-09-01

    Full Text Available Effective and efficient maintenance is essential to ensure reliability of a ship's main propulsion system, which in turn is interdependent on the reliability of a number of associated sub- systems. A primary step in evaluating the reliability of the ship's propulsion system will be to evaluate the reliability of each of the sub- system. This paper discusses the methodology adopted to quantify reliability of one of the vital sub-system viz. the lubricating oil system, and development of a model, based on Markov analysis thereof. Having developed the model, means to improve reliability of the system should be considered. The cost of the incremental reliability should be measured to evaluate cost benefits. A maintenance plan can then be devised to achieve the higher level of reliability. Similar approach could be considered to evaluate the reliability of all other sub-systems. This will finally lead to development of a model to evaluate and improve the reliability of the main propulsion system.

  11. Technologies for improving the availability and reliability of current and future water cooled nuclear power plants. Proceedings of a technical committee meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    One of the activities of the IAEA is to provide all Member States with an international source of balanced, objective information on advanced in technology for water cooled reactors. Since the global nuclear industry has a common interest in improving plant availability and reliability to assure specific individual plant and country perspective as well as to have an image of well managed competitive industry, the IAEA held a Technical Committee Meeting on Technologies for Improving the Availability and Reliability of Current and Future Water Cooled Nuclear Power Plants in September 1997. The basic aim to was to identify, review and exchange information on international developments in technologies for achieving high availability and reliability and to suggest areas where further technical advances could contribute to improvement of performance. Designs for future plants were presented in the context of how they can accommodate both the organizational and technical means for reaching even higher levels of performance. This proceedings contains the contributed papers presented at this Meeting each with a separate abstract. Four sessions were concerned with: policies, practices and procedures for achieving high reliability and availability; improving availability and reliability through better use of today`s technologies; recent advances in technologies for improving availability and reliability; achieving high availability for new plants Refs, figs, tabs

  12. Technologies for improving the availability and reliability of current and future water cooled nuclear power plants. Proceedings of a technical committee meeting

    International Nuclear Information System (INIS)

    1998-11-01

    One of the activities of the IAEA is to provide all Member States with an international source of balanced, objective information on advanced in technology for water cooled reactors. Since the global nuclear industry has a common interest in improving plant availability and reliability to assure specific individual plant and country perspective as well as to have an image of well managed competitive industry, the IAEA held a Technical Committee Meeting on Technologies for Improving the Availability and Reliability of Current and Future Water Cooled Nuclear Power Plants in September 1997. The basic aim to was to identify, review and exchange information on international developments in technologies for achieving high availability and reliability and to suggest areas where further technical advances could contribute to improvement of performance. Designs for future plants were presented in the context of how they can accommodate both the organizational and technical means for reaching even higher levels of performance. This proceedings contains the contributed papers presented at this Meeting each with a separate abstract. Four sessions were concerned with: policies, practices and procedures for achieving high reliability and availability; improving availability and reliability through better use of today's technologies; recent advances in technologies for improving availability and reliability; achieving high availability for new plants

  13. Organisational travel plans for improving health.

    Science.gov (United States)

    Hosking, Jamie; Macmillan, Alexandra; Connor, Jennie; Bullen, Chris; Ameratunga, Shanthi

    2010-03-17

    quality and extracted data. Seventeen studies were included. Ten were conducted in a school setting, two in universities, and five in workplaces. One study directly measured health outcomes, and all included studies measured travel outcomes. Two cluster randomised controlled trials in the school setting showed either no change in travel mode or mixed results. A randomised controlled trial in the workplace setting, conducted in a pre-selected group who were already contemplating or preparing for active travel, found improved health-related quality of life on some sub scales, and increased walking. Two controlled before-after studies found that school travel interventions increased walking. Other studies were judged to be at high risk of bias. No included studies were conducted in low- or middle-income countries, and no studies measured the social distribution of effects or adverse effects, such as injury. There is insufficient evidence to determine whether organisational travel plans are effective for improving health or changing travel mode. Organisational travel plans should be considered as complex health promotion interventions, with considerable potential to influence community health outcomes depending on the environmental context in which they are introduced. Given the current lack of evidence, organisational travel plans should be implemented in the context of robustly-designed research studies, such as well-designed cluster randomised trials.

  14. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-04-10

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... establish and administer an office on Central Valley Project water conservation best management practices...

  15. 78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-10-24

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...

  16. A quantitative calculation for software reliability evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Young-Jun; Lee, Jang-Soo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    To meet these regulatory requirements, the software used in the nuclear safety field has been ensured through the development, validation, safety analysis, and quality assurance activities throughout the entire process life cycle from the planning phase to the installation phase. A variety of activities, such as the quality assurance activities are also required to improve the quality of a software. However, there are limitations to ensure that the quality is improved enough. Therefore, the effort to calculate the reliability of the software continues for a quantitative evaluation instead of a qualitative evaluation. In this paper, we propose a quantitative calculation method for the software to be used for a specific operation of the digital controller in an NPP. After injecting random faults in the internal space of a developed controller and calculating the ability to detect the injected faults using diagnostic software, we can evaluate the software reliability of a digital controller in an NPP. We tried to calculate the software reliability of the controller in an NPP using a new method that differs from a traditional method. It calculates the fault detection coverage after injecting the faults into the software memory space rather than the activity through the life cycle process. We attempt differentiation by creating a new definition of the fault, imitating the software fault using the hardware, and giving a consideration and weights for injection faults.

  17. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  18. Human factor reliability program

    International Nuclear Information System (INIS)

    Knoblochova, L.

    2017-01-01

    The human factor's reliability program was at Slovenske elektrarne, a.s. (SE) nuclear power plants. introduced as one of the components Initiatives of Excellent Performance in 2011. The initiative's goal was to increase the reliability of both people and facilities, in response to 3 major areas of improvement - Need for improvement of the results, Troubleshooting support, Supporting the achievement of the company's goals. The human agent's reliability program is in practice included: - Tools to prevent human error; - Managerial observation and coaching; - Human factor analysis; -Quick information about the event with a human agent; -Human reliability timeline and performance indicators; - Basic, periodic and extraordinary training in human factor reliability(authors)

  19. Problematics of Reliability of Road Rollers

    Science.gov (United States)

    Stawowiak, Michał; Kuczaj, Mariusz

    2018-06-01

    This article refers to the reliability of road rollers used in a selected roadworks company. Information on the method of road rollers service and how the service affects the reliability of these rollers is presented. Attention was paid to the process of the implemented maintenance plan with regard to the machine's operational time. The reliability of road rollers was analyzed by determining and interpreting readiness coefficients.

  20. Engineering, maintenance, and new initiatives to improve LAMPF beam availability and system reliability

    International Nuclear Information System (INIS)

    Harris, H.W.; DeHaven, R.A.; Hart, V.E.; Parsons, W.M.; Sturrock, J.C.

    1992-01-01

    Two different requirements are driving engineering studies and hardware development to improve LAMPF. The first is concerned with component and system improvements to increase beam availability during the LAMPF production cycle. Hardware changes in RF, power supplies, and magnets are being implemented to increase mean time between failure and reduce time to replace or repair failed units. A joint LAMPF-Industry project is on-going to improve reliability of RF components. A component test stand is being refurbished to include significant development capability. The second approach includes several changes that will increase the duty factor of the existing accelerator. Major changes are being evaluated for replacing the front end of the accelerator. Other changes improving high brightness capability could result in a new performance plateau for LAMPF

  1. 35/30 outage improvement project

    International Nuclear Information System (INIS)

    Clewett, L.

    2011-01-01

    Outage performance is a significant contributor to the business plan at Bruce Power. A process improvement initiative commenced in 2010-11 to improve outage efficiency and predictability. 12 teams (over 200 people) participated in improvement identification in four areas: Organizational Engagement; Outage Scope; Resources; and, Critical Outage Execution. Out of over 550 initiatives identified, 200 are being incorporated into the Outage Improvement Initiative. Key deliverables include: Development of a long-range 'fleet-level' business strategy to integrate outage duration, outage improvements and unit refurbishments; Development of a 35 day outage schedule template; Determining optimal outage organization to perform outages on an 8-unit site; Improved schedule adherence and productivity; Process to integrate scope needs to support life-cycle and long-range outage needs improvement while meeting near term and regulatory requirements; Consistent methodology in planning of outages to front-end load the high risk work into the outage schedule; Consistent baseline by senior leaders for the expectations of milestone ownership and completion; Consistent framework for milestone compliance and preparation; Communication strategy to educate personnel on the importance of the outage program and nuclear safety, business goals, and budget; and, Suite of metrics based upon industry benchmarks. The Outage Improvement Initiative has a goal of 35 day outages every 30 months. This potentially represents considerable savings to the Bruce Power business plan, both direct revenue savings attributed to reduced outage duration, as well as incremental outage cost savings. Other improvements from the initiative will include personnel radiation exposure and equipment reliability due to decreased outage duration and adherence to scoping, assessing and long lead part milestones. This presentation will describe the outage improvement initiatives to achieve a goal of consistent 35 day outages

  2. 35/30 outage improvement project

    Energy Technology Data Exchange (ETDEWEB)

    Clewett, L. [Bruce Power, Tiverton, Ontario (Canada)

    2011-07-01

    Outage performance is a significant contributor to the business plan at Bruce Power. A process improvement initiative commenced in 2010-11 to improve outage efficiency and predictability. 12 teams (over 200 people) participated in improvement identification in four areas: Organizational Engagement; Outage Scope; Resources; and, Critical Outage Execution. Out of over 550 initiatives identified, 200 are being incorporated into the Outage Improvement Initiative. Key deliverables include: Development of a long-range 'fleet-level' business strategy to integrate outage duration, outage improvements and unit refurbishments; Development of a 35 day outage schedule template; Determining optimal outage organization to perform outages on an 8-unit site; Improved schedule adherence and productivity; Process to integrate scope needs to support life-cycle and long-range outage needs improvement while meeting near term and regulatory requirements; Consistent methodology in planning of outages to front-end load the high risk work into the outage schedule; Consistent baseline by senior leaders for the expectations of milestone ownership and completion; Consistent framework for milestone compliance and preparation; Communication strategy to educate personnel on the importance of the outage program and nuclear safety, business goals, and budget; and, Suite of metrics based upon industry benchmarks. The Outage Improvement Initiative has a goal of 35 day outages every 30 months. This potentially represents considerable savings to the Bruce Power business plan, both direct revenue savings attributed to reduced outage duration, as well as incremental outage cost savings. Other improvements from the initiative will include personnel radiation exposure and equipment reliability due to decreased outage duration and adherence to scoping, assessing and long lead part milestones. This presentation will describe the outage improvement initiatives to achieve a goal of consistent 35 day

  3. 75 FR 35689 - System Personnel Training Reliability Standards

    Science.gov (United States)

    2010-06-23

    ... planning staff at control areas and reliability coordinators concerning power system characteristics and... Coordination--Staffing). \\11\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, Federal... American bulk electric system are competent to perform those reliability-related tasks.\\22\\ The proposed...

  4. Technical Note: Improving the VMERGE treatment planning algorithm for rotational radiotherapy

    Energy Technology Data Exchange (ETDEWEB)

    Gaddy, Melissa R., E-mail: mrgaddy@ncsu.edu; Papp, Dávid, E-mail: dpapp@ncsu.edu [Department of Mathematics, North Carolina State University, Raleigh, North Carolina 27695-8205 (United States)

    2016-07-15

    Purpose: The authors revisit the VMERGE treatment planning algorithm by Craft et al. [“Multicriteria VMAT optimization,” Med. Phys. 39, 686–696 (2012)] for arc therapy planning and propose two changes to the method that are aimed at improving the achieved trade-off between treatment time and plan quality at little additional planning time cost, while retaining other desirable properties of the original algorithm. Methods: The original VMERGE algorithm first computes an “ideal,” high quality but also highly time consuming treatment plan that irradiates the patient from all possible angles in a fine angular grid with a highly modulated beam and then makes this plan deliverable within practical treatment time by an iterative fluence map merging and sequencing algorithm. We propose two changes to this method. First, we regularize the ideal plan obtained in the first step by adding an explicit constraint on treatment time. Second, we propose a different merging criterion that comprises of identifying and merging adjacent maps whose merging results in the least degradation of radiation dose. Results: The effect of both suggested modifications is evaluated individually and jointly on clinical prostate and paraspinal cases. Details of the two cases are reported. Conclusions: In the authors’ computational study they found that both proposed modifications, especially the regularization, yield noticeably improved treatment plans for the same treatment times than what can be obtained using the original VMERGE method. The resulting plans match the quality of 20-beam step-and-shoot IMRT plans with a delivery time of approximately 2 min.

  5. Substation design improvement with a probabilistic reliability approach using the TOPASE program

    Energy Technology Data Exchange (ETDEWEB)

    Bulot, M.; Heroin, G.; Bergerot, J-L.; Le Du, M. [Electricite de France (France)

    1997-12-31

    TOPASE, (the French acronym for Probabilistic Tools and Data Processing for the Analysis of Electric Systems), developed by Electricite de France (EDF) to perform reliability studies on transmission substations, was described. TOPASE serves a dual objective of assisting in the automation of HV substation studies, as well as enabling electrical systems experts who are not necessarily specialists in reliability studies to perform such studies. The program is capable of quantifying the occurrence rate of undesirable events and of identifying critical equipment and the main incident scenarios. The program can be used to improve an existing substation, to choose an HV structure during the design stage, or to choose a system of protective devices. Data collected during 1996 and 1997 will be analyzed to identify useful experiences and to validate the basic concepts of the program. 4 figs.

  6. Strategic planning as a focus for continuous improvement. A case study

    Science.gov (United States)

    Oneill, John W.; Gordon-Winkler, Lyn

    1992-01-01

    What do most of the successful people and organizations in our world have in common? Instead of worrying about the future, they work to create it. They have a plan, or a vision of what they want to accomplish and they focus their efforts on success. Strategic planning has been described as a disciplined, ongoing process to produce fundamental decisions and actions that shape what an organization is, what it does, and how it will respond to a changing environment. This case study discussion will evaluate the relationship between strategic planning and Total Quality Management (TQM), or continuous improvement, through the experience of the NASA Johnson Space Center in developing a strategy for the future. That experience clearly illustrates the value of strategic planning in setting the framework and establishing the overall thrust of continuous improvement initiatives. Equally significant, the fundamentals of a quality culture such as strong customer and supplier partnerships, participative involvement, open communications, and ownership were essential in overcoming the challenges inherent in the planning process. A reinforced management commitment to the quality culture was a clear, long-term benefit.

  7. Strategic planning as a focus for continuous improvement. A case study

    Science.gov (United States)

    Oneill, John W.; Gordon-Winkler, Lyn

    What do most of the successful people and organizations in our world have in common? Instead of worrying about the future, they work to create it. They have a plan, or a vision of what they want to accomplish and they focus their efforts on success. Strategic planning has been described as a disciplined, ongoing process to produce fundamental decisions and actions that shape what an organization is, what it does, and how it will respond to a changing environment. This case study discussion will evaluate the relationship between strategic planning and Total Quality Management (TQM), or continuous improvement, through the experience of the NASA Johnson Space Center in developing a strategy for the future. That experience clearly illustrates the value of strategic planning in setting the framework and establishing the overall thrust of continuous improvement initiatives. Equally significant, the fundamentals of a quality culture such as strong customer and supplier partnerships, participative involvement, open communications, and ownership were essential in overcoming the challenges inherent in the planning process. A reinforced management commitment to the quality culture was a clear, long-term benefit.

  8. software reliability: failures, consequences and improvement

    African Journals Online (AJOL)

    BARTH EKWUEME

    2009-07-16

    Jul 16, 2009 ... function of time, but it is believed that some modeling technique for software reliability is reaching propensity, by ..... February 25, 1991 during the Gulf war, the chopping ... Let us consider a few key concepts that apply to both.

  9. Follow-up of CT-derived airway wall thickness: Correcting for changes in inspiration level improves reliability

    Energy Technology Data Exchange (ETDEWEB)

    Pompe, Esther, E-mail: e.pompe@umcutrecht.nl [Department of Respiratory Medicine, University Medical Center Utrecht, Utrecht (Netherlands); Rikxoort, Eva M. van [Department of Radiology, Radboud University Medical Center, Nijmegen (Netherlands); Mets, Onno M. [Department of Radiology, University Medical Center Utrecht, Utrecht (Netherlands); Charbonnier, Jean-Paul [Department of Radiology, Radboud University Medical Center, Nijmegen (Netherlands); Kuhnigk, Jan-Martin [Institute for Medical Image Computing, Fraunhofer MEVIS, Bremen (Germany); Koning, Harry J. de [Department of Public Health, Erasmus Medical Center, Rotterdam (Netherlands); Oudkerk, Matthijs [University of Groningen, University Medical Center Groningen, Groningen, Department of Radiology (Netherlands); Vliegenthart, Rozemarijn [University of Groningen, University Medical Center Groningen, Groningen, Department of Radiology (Netherlands); University of Groningen, University Medical Center Groningen, Center for Medical Imaging-North East Netherlands, Groningen (Netherlands); Zanen, Pieter; Lammers, Jan-Willem J. [Department of Respiratory Medicine, University Medical Center Utrecht, Utrecht (Netherlands); Ginneken, Bram van [Department of Radiology, Radboud University Medical Center, Nijmegen (Netherlands); Jong, Pim A. de; Mohamed Hoesein, Firdaus A.A. [Department of Radiology, University Medical Center Utrecht, Utrecht (Netherlands)

    2016-11-15

    Objectives: Airway wall thickness (AWT) is affected by changes in lung volume. This study evaluated whether correcting AWT on computed tomography (CT) for differences in inspiration level improves measurement agreement, reliability, and power to detect changes over time. Methods: Participants of the Dutch-Belgian lung cancer screening trial who underwent 3-month repeat CT for an indeterminate pulmonary nodule were included. AWT on CT was calculated by the square root of the wall area at a theoretical airway with an internal perimeter of 10 mm (Pi10). The scan with the highest lung volume was labelled as the reference scan and the scan with the lowest lung volume was labelled as the comparison scan. Pi10 derived from the comparison scan was corrected by multiplying it with the ratio of CT lung volume of the comparison scan to CT lung volume on the reference scan. Agreement of uncorrected and corrected Pi10 was studied with the Bland-Altman method, reliability with intra-class correlation coefficients (ICC), and power to detect changes over time was calculated. Results: 315 male participants were included. Limit of agreement and reliability for Pi10 was −0.61 to 0.57 mm (ICC = 0.87), which improved to −0.38 to 0.37 mm (ICC = 0.94) after correction for inspiration level. To detect a 15% change over 3 months, 71 subjects are needed for Pi10 and 26 subjects for Pi10 adjusted for inspiration level. Conclusions: Correcting Pi10 for differences in inspiration level improves reliability, agreement, and power to detect changes over time.

  10. Examining the value of travel time reliability for freight transportation to support freight planning and decision-making.

    Science.gov (United States)

    2016-12-01

    This report presents the findings of a valuation study recently conducted in Florida to quantify the : freight users willingness to pay (WTP) for the improvement of transportation-related attributes, : particularly reliability. A stated preference...

  11. 2017 NREL Photovoltaic Reliability Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Sarah [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-08-15

    NREL's Photovoltaic (PV) Reliability Workshop (PVRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology -- both critical goals for moving PV technologies deeper into the electricity marketplace.

  12. ECLSS Reliability for Long Duration Missions Beyond Lower Earth Orbit

    Science.gov (United States)

    Sargusingh, Miriam J.; Nelson, Jason

    2014-01-01

    Reliability has been highlighted by NASA as critical to future human space exploration particularly in the area of environmental controls and life support systems. The Advanced Exploration Systems (AES) projects have been encouraged to pursue higher reliability components and systems as part of technology development plans. However, there is no consensus on what is meant by improving on reliability; nor on how to assess reliability within the AES projects. This became apparent when trying to assess reliability as one of several figures of merit for a regenerable water architecture trade study. In the Spring of 2013, the AES Water Recovery Project (WRP) hosted a series of events at the NASA Johnson Space Center (JSC) with the intended goal of establishing a common language and understanding of our reliability goals and equipping the projects with acceptable means of assessing our respective systems. This campaign included an educational series in which experts from across the agency and academia provided information on terminology, tools and techniques associated with evaluating and designing for system reliability. The campaign culminated in a workshop at JSC with members of the ECLSS and AES communities with the goal of developing a consensus on what reliability means to AES and identifying methods for assessing our low to mid-technology readiness level (TRL) technologies for reliability. This paper details the results of the workshop.

  13. 75 FR 23222 - National Poultry Improvement Plan; General Conference Committee Meeting and 40th Biennial Conference

    Science.gov (United States)

    2010-05-03

    ...] National Poultry Improvement Plan; General Conference Committee Meeting and 40th Biennial Conference AGENCY... notice of a meeting of the General Conference Committee of the National Poultry Improvement Plan (NPIP... Coordinator, National Poultry Improvement Plan, VS, APHIS, 1498 Klondike Road, Suite 101, Conyers, GA 30094...

  14. 77 FR 46374 - National Poultry Improvement Plan; General Conference Committee Meeting and 41st Biennial Conference

    Science.gov (United States)

    2012-08-03

    ...] National Poultry Improvement Plan; General Conference Committee Meeting and 41st Biennial Conference AGENCY... notice of a meeting of the General Conference Committee of the National Poultry Improvement Plan (NPIP... CONTACT: Dr. C. Stephen Roney, Senior Coordinator, National Poultry Improvement Plan, VS, APHIS, 1506...

  15. Use of Human Reliability Insights to Improve Decision-Making

    International Nuclear Information System (INIS)

    Julius, J. A.; Moieni, P.; Grobbelaar, J.; Kohlhepp, K.

    2016-01-01

    This paper describes the use of insights obtained during the development and application of human reliability analysis (HRA) as part of a probabilistic risk assessment (PRA) to support decision-making, including improvements to operations, training, and safety culture. Insights have been gained from the development and application of HRA as part of a PRA for nuclear power plants in the USA, Europe and Asia over the last two decades. These models consist of Level 1 and Level 2 PRA models of internal and external events, during full power and shutdown modes of plant operation. These insights include the use of human factors information to improve the qualitative portion of the HRA. The subsequent quantification in the HRA effectively prioritises the contributors to the unreliability of operator actions, and the process facilitates the identification of the factors that are important to the success of the operator actions. Additionally, the tools and techniques also allow for the evaluation of key assumptions and sources of uncertainty. The end results have been used to effectively support decision-making for day-to-day plant operations as well as licensing issues. HRA results have been used to provide feedback and improvements to plant procedures, operator training and other areas contributing the plant safety culture. Examples of the types of insights are presented in this paper. (author)

  16. Improving Electronic Sensor Reliability by Robust Outlier Screening

    Directory of Open Access Journals (Sweden)

    Federico Cuesta

    2013-10-01

    Full Text Available Electronic sensors are widely used in different application areas, and in some of them, such as automotive or medical equipment, they must perform with an extremely low defect rate. Increasing reliability is paramount. Outlier detection algorithms are a key component in screening latent defects and decreasing the number of customer quality incidents (CQIs. This paper focuses on new spatial algorithms (Good Die in a Bad Cluster with Statistical Bins (GDBC SB and Bad Bin in a Bad Cluster (BBBC and an advanced outlier screening method, called Robust Dynamic Part Averaging Testing (RDPAT, as well as two practical improvements, which significantly enhance existing algorithms. Those methods have been used in production in Freescale® Semiconductor probe factories around the world for several years. Moreover, a study was conducted with production data of 289,080 dice with 26 CQIs to determine and compare the efficiency and effectiveness of all these algorithms in identifying CQIs.

  17. Developing Predictive Maintenance Expertise to Improve Plant Equipment Reliability

    International Nuclear Information System (INIS)

    Wurzbach, Richard N.

    2002-01-01

    On-line equipment condition monitoring is a critical component of the world-class production and safety histories of many successful nuclear plant operators. From addressing availability and operability concerns of nuclear safety-related equipment to increasing profitability through support system reliability and reduced maintenance costs, Predictive Maintenance programs have increasingly become a vital contribution to the maintenance and operation decisions of nuclear facilities. In recent years, significant advancements have been made in the quality and portability of many of the instruments being used, and software improvements have been made as well. However, the single most influential component of the success of these programs is the impact of a trained and experienced team of personnel putting this technology to work. Changes in the nature of the power generation industry brought on by competition, mergers, and acquisitions, has taken the historically stable personnel environment of power generation and created a very dynamic situation. As a result, many facilities have seen a significant turnover in personnel in key positions, including predictive maintenance personnel. It has become the challenge for many nuclear operators to maintain the consistent contribution of quality data and information from predictive maintenance that has become important in the overall equipment decision process. These challenges can be met through the implementation of quality training to predictive maintenance personnel and regular updating and re-certification of key technology holders. The use of data management tools and services aid in the sharing of information across sites within an operating company, and with experts who can contribute value-added data management and analysis. The overall effectiveness of predictive maintenance programs can be improved through the incorporation of newly developed comprehensive technology training courses. These courses address the use of

  18. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  19. Nuclear power plant safety and reliability improvements derived from operational experience analysis

    International Nuclear Information System (INIS)

    Zebroski, E.L.; Rosen, S.L.

    1983-01-01

    The frequency and distribution of significant events at operating nuclear power plants can be used as one of several indices to obtain a preliminary indication of unit and/or utility performance in the development and implementation of improvements aimed at reducing the probability or consequences of troublesome events. Initial data of this type are presented along with qualifications on the validity of such indicators. Planned further steps to improve this as a performance indicator are noted

  20. Improving productivity levels: family planning services for factory workers.

    Science.gov (United States)

    Darmokusumo, H V

    1989-10-01

    In May 1984, the Minister of Manpower in Indonesia, the Chairman of the BKKBN, and representatives of the employers' and workers' organizations of Indonesia issued a joint decree pledging that they would work together to enhance the implementation of the family planning program among workers in the organized sector. 1 objective of the decree is to improve workers' productivity and the standard of living of workers and their families by implementing a family planning program. 1 baseline survey and a clinic-based survey in 5 provinces revealed that 90% of women workers are between 21-40, or are of reproductive age, and are sexually active. Only about 50% are practicing family planning; the other 50% are afraid to practice family planning due to potential side effects of various methods. This fear was most often caused by negative rumors spread by unsatisfied family planning clients. Placing materials for family planning promotion such as instructional posters and video programs advertising contraceptive services in the work setting may increase knowledge and help alleviate some of this fear. Other studies of family planning services show that employees prefer female medical doctors or midwives as service providers, employees are willing to pay for services (but can only afford a small fee), and family planning service points should be near employees' work sites.

  1. A framework for reliability and risk centered maintenance

    International Nuclear Information System (INIS)

    Selvik, J.T.; Aven, T.

    2011-01-01

    Reliability centered maintenance (RCM) is a well-established analysis method for preventive maintenance planning. As its name indicates, reliability is the main point of reference for the planning, but consequences of failures are also assessed. However, uncertainties and risk are to a limited extent addressed by the RCM method, and in this paper we suggest an extension of the RCM to reliability and risk centered maintenance (RRCM) by also considering risk as the reference for the analysis in addition to reliability. A broad perspective on risk is adopted where uncertainties are the main component of risk in addition to possible events and associated consequences. A case from the offshore oil and gas industry is presented to illustrate and discuss the suggested approach.

  2. STUDIES ON IGBT MODULE TO IMPROVE THE RELIABILITY OF POWER ELECTRONIC SYSTEMS

    DEFF Research Database (Denmark)

    Choi, Uimin

    component level to converter level. It is divided into two main parts: the first part, which consists of Chapters 2 and 3, is reliability studies of the IGBT module regarding thermal stresses and the second part, composed of Chapters 4 and 5, discusses strategies to improve the reliability and availability...... are presented. Then, in Chapter 3, the effect of junction temperature swing duration t△Tj on the lifetime of the transfer molded Intelligent Power IGBT Module is investigated and modeled based on the power cycling test results. In addition, the physics-of-failure analysis results of the tested modules...... are presented. Finally, in Chapters 4 and 5, open-circuit fault detection and fault-tolerant control methods are proposed for two kinds of neutral-point clamped three-level inverters T-type and NPC inverters. One of main contributions in this project is the development of an apparatus and methodology...

  3. Improvement Plans of Fermilab’s Proton Accelerator Complex

    Science.gov (United States)

    Shiltsev, Vladimir

    2017-09-01

    The flagship of Fermilab’s long term research program is the Deep Underground Neutrino Experiment (DUNE), located Sanford Underground Research Facility (SURF) in Lead, South Dakota, which will study neutrino oscillations with a baseline of 1300 km. The neutrinos will be produced in the Long Baseline Neutrino Facility (LBNF), a proposed new beam line from Fermilab’s Main Injector. The physics goals of the DUNE require a proton beam with a power of some 2.4 MW at 120 GeV, which is roughly four times the current maximum power. Here I discuss current performance of the Fermilab proton accelerator complex, our plans for construction of the SRF proton linac as key part of the Proton Improvement Plan-II (PIP-II), outline the main challenges toward multi-MW beam power operation of the Fermilab accelerator complex and the staged plan to achieve the required performance over the next 15 years.

  4. Improved reliability of power modules

    DEFF Research Database (Denmark)

    Baker, Nick; Liserre, Marco; Dupont, Laurent

    2014-01-01

    Power electronic systems play an increasingly important role in providing high-efficiency power conversion for adjustable-speed drives, power-quality correction, renewable-energy systems, energy-storage systems, and electric vehicles. However, they are often presented with demanding operating...... environments that challenge the reliability aspects of power electronic techniques. For example, increasingly thermally stressful environments are seen in applications such as electric vehicles, where ambient temperatures under the hood exceed 150 °C, while some wind turbine applications can place large...

  5. Human Factors Review Plan

    International Nuclear Information System (INIS)

    Paramore, B.; Peterson, L.R.

    1985-12-01

    ''Human Factors'' is concerned with the incorporation of human user considerations into a system in order to maximize human reliability and reduce errors. This Review Plan is intended to assist in the assessment of human factors conditions in existing DOE facilities. In addition to specifying assessment methodologies, the plan describes techniques for improving conditions which are found to not adequately support reliable human performance. The following topics are addressed: (1) selection of areas for review describes techniques for needs assessment to assist in selecting and prioritizing areas for review; (2) human factors engineering review is concerned with optimizing the interfaces between people and equipment and people and their work environment; (3) procedures review evaluates completeness and accuracy of procedures, as well as their usability and management; (4) organizational interface review is concerned with communication and coordination between all levels of an organization; and (5) training review evaluates training program criteria such as those involving: trainee selection, qualification of training staff, content and conduct of training, requalification training, and program management

  6. Human Factors Review Plan

    Energy Technology Data Exchange (ETDEWEB)

    Paramore, B.; Peterson, L.R. (eds.)

    1985-12-01

    ''Human Factors'' is concerned with the incorporation of human user considerations into a system in order to maximize human reliability and reduce errors. This Review Plan is intended to assist in the assessment of human factors conditions in existing DOE facilities. In addition to specifying assessment methodologies, the plan describes techniques for improving conditions which are found to not adequately support reliable human performance. The following topics are addressed: (1) selection of areas for review describes techniques for needs assessment to assist in selecting and prioritizing areas for review; (2) human factors engineering review is concerned with optimizing the interfaces between people and equipment and people and their work environment; (3) procedures review evaluates completeness and accuracy of procedures, as well as their usability and management; (4) organizational interface review is concerned with communication and coordination between all levels of an organization; and (5) training review evaluates training program criteria such as those involving: trainee selection, qualification of training staff, content and conduct of training, requalification training, and program management.

  7. Improved Beam Angle Arrangement in Intensity Modulated Proton Therapy Treatment Planning for Localized Prostate Cancer

    International Nuclear Information System (INIS)

    Cao, Wenhua; Lim, Gino J.; Li, Yupeng; Zhu, X. Ronald; Zhang, Xiaodong

    2015-01-01

    Purpose: This study investigates potential gains of an improved beam angle arrangement compared to a conventional fixed gantry setup in intensity modulated proton therapy (IMPT) treatment for localized prostate cancer patients based on a proof of principle study. Materials and Methods: Three patients with localized prostate cancer retrospectively selected from our institution were studied. For each patient, IMPT plans were designed using two, three and four beam angles, respectively, obtained from a beam angle optimization algorithm. Those plans were then compared with ones using two lateral parallel-opposed beams according to the conventional planning protocol for localized prostate cancer adopted at our institution. Results: IMPT plans with two optimized angles achieved significant improvements in rectum sparing and moderate improvements in bladder sparing against those with two lateral angles. Plans with three optimized angles further improved rectum sparing significantly over those two-angle plans, whereas four-angle plans found no advantage over three-angle plans. A possible three-beam class solution for localized prostate patients was suggested and demonstrated with preserved dosimetric benefits because individually optimized three-angle solutions were found sharing a very similar pattern. Conclusions: This study has demonstrated the potential of using an improved beam angle arrangement to better exploit the theoretical dosimetric benefits of proton therapy and provided insights of selecting quality beam angles for localized prostate cancer treatment

  8. 75 FR 27341 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Science.gov (United States)

    2010-05-14

    ..., ramp rates, and network topology), flexible dispatch, settlement calculations, transmission switching... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference To Discuss Increasing Market and Planning Efficiency Through Improved Software May 7, 2010. Take notice that Commission...

  9. Improved Iterative Hard- and Soft-Reliability Based Majority-Logic Decoding Algorithms for Non-Binary Low-Density Parity-Check Codes

    Science.gov (United States)

    Xiong, Chenrong; Yan, Zhiyuan

    2014-10-01

    Non-binary low-density parity-check (LDPC) codes have some advantages over their binary counterparts, but unfortunately their decoding complexity is a significant challenge. The iterative hard- and soft-reliability based majority-logic decoding algorithms are attractive for non-binary LDPC codes, since they involve only finite field additions and multiplications as well as integer operations and hence have significantly lower complexity than other algorithms. In this paper, we propose two improvements to the majority-logic decoding algorithms. Instead of the accumulation of reliability information in the existing majority-logic decoding algorithms, our first improvement is a new reliability information update. The new update not only results in better error performance and fewer iterations on average, but also further reduces computational complexity. Since existing majority-logic decoding algorithms tend to have a high error floor for codes whose parity check matrices have low column weights, our second improvement is a re-selection scheme, which leads to much lower error floors, at the expense of more finite field operations and integer operations, by identifying periodic points, re-selecting intermediate hard decisions, and changing reliability information.

  10. Performance Improvement in 503A Compounding Pharmacies: A PLAN FOR ASSESSMENT, IMPLEMENTATION, AND SUSTAINED SUCCESS.

    Science.gov (United States)

    Pritchett, Jon; Mixon, William; O'Connell, Kevin

    2016-01-01

    Performance improvement is the continual effort to objectively assess current performance and then restructure the practices that support it to more closely achieve desired performance. A plan for performance improvement, unlike other approaches to correcting problems in job fulfillment, is a systematic method used to first find the root causes of areas of concern and then apply corrections to remedy those deficits. Implementing a performance improvement plan that can be easily adapted to ensure compliance with evolving and increasingly complex state and federal regulations is crucial to a successful compounding practice. In this article, we discuss the need for performance improvement in 503A compounding pharmacies, list the steps necessary to develop such a plan, and present three case reports of performance improvement plans in differing compounding settings.

  11. A study of operational and testing reliability in software reliability analysis

    International Nuclear Information System (INIS)

    Yang, B.; Xie, M.

    2000-01-01

    Software reliability is an important aspect of any complex equipment today. Software reliability is usually estimated based on reliability models such as nonhomogeneous Poisson process (NHPP) models. Software systems are improving in testing phase, while it normally does not change in operational phase. Depending on whether the reliability is to be predicted for testing phase or operation phase, different measure should be used. In this paper, two different reliability concepts, namely, the operational reliability and the testing reliability, are clarified and studied in detail. These concepts have been mixed up or even misused in some existing literature. Using different reliability concept will lead to different reliability values obtained and it will further lead to different reliability-based decisions made. The difference of the estimated reliabilities is studied and the effect on the optimal release time is investigated

  12. A High Intensity Interval Training (HIIT)-Based Running Plan Improves Athletic Performance by Improving Muscle Power.

    Science.gov (United States)

    García-Pinillos, Felipe; Cámara-Pérez, Jose C; Soto-Hermoso, Víctor M; Latorre-Román, Pedro Á

    2017-01-01

    García-Pinillos, F, Cámara-Pérez, JC, Soto-Hermoso, VM, and Latorre-Román, PÁ. A High Intensity Interval Training (HIIT)-based running plan improves athletic performance by improving muscle power. J Strength Cond Res 31(1): 146-153, 2017-This study aimed to examine the effect of a 5-week high-intensity intermittent training (HIIT)-based running plan on athletic performance and to compare the physiological and neuromuscular responses during a sprint-distance triathlon before and after the HIIT period. Thirteen triathletes were matched into 2 groups: the experimental group (EG) and the control group (CG). The CG was asked to maintain their normal training routines, whereas the EG maintained only their swimming and cycling routines and modified their running routine. Participants completed a sprint-distance triathlon before (pretest) and after (posttest) the intervention period. In both pretest and posttest, the participants performed 4 jumping tests: before the race (baseline), postswim, postcycling, and postrun. Additionally, heart rate was monitored (HRmean), whereas rate of perceived exertion (RPE) and blood lactate accumulation (BLa) were registered after the race. No significant differences (p ≥ 0.05) between groups were found before HIIT intervention (at pretest). Significant group-by-training interactions were found in vertical jumping ability and athletic performance: the EG improved jumping performance (∼6-9%, p ≤ 0.05, effect size (ES) > 0.7), swimming performance (p = 0.013, ES = 0.438), and running time (p = 0.001, ES = 0.667) during the competition, whereas the CG remained unchanged (p ≥ 0.05, ES HIIT-based running plan combined with the high training volumes of these triathletes in swimming and cycling improved athletic performance during a sprint-distance triathlon. This improvement may be due to improved neuromuscular characteristics that were transferred into improved muscle power and work economy.

  13. Minister Peng stresses the necessity for improving the working style in family planning implementation.

    Science.gov (United States)

    1993-06-01

    China's State Counselor and Minister of the State Family Planning (FP) Commission is reported to have made suggestions on improving FP effectiveness to officials in Qianshan and Jinzhai counties of Anhui Province, in Hongya and Mingshan counties of Sichuan Province, and in Dezhau Prefecture and Tai'an City of Shandong Province. In Anhui Province, Minister Peng Peiyun emphasized the importance of FP at the grassroots level and the responsibility of providing education, publicity, and contraceptive services to each couple of childbearing age. Publicity is needed to popularize the advantages and necessity of deferred marriage, deferred childbearing, fewer and healthier births, and gender equality. In Sichuan, Minister Peng state that FP is important for economic development. Other benefits are an improved standard of living, an improvement in women's social status, the formation of healthier and happier families, and improvement in the quality of human resources. Minister Peng stressed that social reform could change existing habits and customs. Publicity should be specific to conditions in each province and include information on how to increase family income, scientific production skills, and good child-rearing practices. Contraceptive services should be available in every village, and quality must be improved. This means wider contraceptive choices, more concern for the day-to-day problems of families with one daughter, and improved training of FP technicians to increase safety and reliability. In Shandong Province, Minister Peng urged that quotas be retained, but the pressure should be reduced on subordinating departments. Targets for FP implementation can be attained when major departments cooperate with those on grass roots level. Requirements must be practical. All couples should be permitted to bear a second child after a birth interval of several years. Program quality can be improved by upgrading worker's skills and building a large group of qualified FP

  14. Reliability of eddy current examination of steam generator tubes

    International Nuclear Information System (INIS)

    Birks, A.S.; Ferris, R.H.; Doctor, P.G.; Clark, R.A.; Spanner, G.E.

    1985-04-01

    A unique study of nondestructive examination reliability is underway at the Pacific Northwest Laboratory under US Nuclear Regulatory Commission sponsorship. Project participants include the Electric Power Research Institute and consortiums from France, Italy, and Japan. This study group has conducted a series of NDE examinations of tubes from a retired-from-service steam generator, using commercially available multifrequency eddy current equipment and ASME procedures. The examination results have been analyzed to identify factors contributing to variations in NDE inspection findings. The reliability of these examinations will then be validated by destructive analyses of the steam generator tubes. The program is expected to contribute to development of a model for steam generator inservice inspection sampling plans and inspection periods, as well as to improved regulatory guidelines for tube plugging

  15. Using Iterative Plan-Do-Study-Act Cycles to Improve Teaching Pedagogy.

    Science.gov (United States)

    Murray, Elizabeth J

    2018-01-15

    Most students entering nursing programs today are members of Generation Y or the Millennial generation, and they learn differently than previous generations. Nurse educators must consider implementing innovative teaching strategies that appeal to the newest generation of learners. The Plan-Do-Study-Act cycle is a framework that can be helpful when planning, assessing, and continually improving teaching pedagogy. This article describes the use of iterative Plan-Do-Study-Act cycles to implement a change in teaching pedagogy.

  16. The Robot Path Planning Based on Improved Artificial Fish Swarm Algorithm

    Directory of Open Access Journals (Sweden)

    Yi Zhang

    2016-01-01

    Full Text Available Path planning is critical to the efficiency and fidelity of robot navigation. The solution of robot path planning is to seek a collision-free and the shortest path from the start node to target node. In this paper, we propose a new improved artificial fish swarm algorithm (IAFSA to process the mobile robot path planning problem in a real environment. In IAFSA, an attenuation function is introduced to improve the visual of standard AFSA and get the balance of global search and local search; also, an adaptive operator is introduced to enhance the adaptive ability of step. Besides, a concept of inertia weight factor is proposed in IAFSA inspired by PSO intelligence algorithm to improve the convergence rate and accuracy of IAFSA. Five unconstrained optimization test functions are given to illustrate the strong searching ability and ideal convergence of IAFSA. Finally, the ROS (robot operation system based experiment is carried out on a Pioneer 3-DX mobile robot; the experiment results also show the superiority of IAFSA.

  17. Customer-focused planning: Beyond integrated resource planning

    International Nuclear Information System (INIS)

    Hastings, P.C.

    1992-01-01

    Integrated resource planning (IRP) evolved from the growing recognition by utilities and regulators that efforts to influence the use of electricity by customers could be more cost-effective than simply expanding the generation system. Improvements in IRP methodology are taking many different forms. One major effort is to move planning closer to the customer. Customer-focused planning (CFP) starts with customer values and uses these to drive decision-making within the utility. CFP is process- rather than product- oriented and typically operates at the bulk power system level. Options available to meet customer needs include electricity, alternative fuels, capital substitution, and end-use management or control. The customer selects the option(s) based on a value set that typically includes safety, reliability, convenience, and cost. There are also four possible levels of decision-making: the end-use; customer/power meter; transmission/distribution interface; and the utility bulk power system. Challenges of implementing CFP include identifying customer wants, needs, and values; integration of utility planning efforts; and the dynamics of the CFP process, in which costs can change with each modification of the transmission and distribution system. Two examples of recent moves toward CFP at Central Maine Power are reviewed. 2 refs., 1 fig

  18. Improving resource capacity planning in hospitals with business approaches.

    NARCIS (Netherlands)

    van Lent, Wineke Agnes Marieke; van Lent, W.A.M.

    2011-01-01

    This dissertation contributed to the knowledge on the translation of approaches from businesses and services to improve the resource capacity planning on tactical and operational level in (oncologic) hospital care. The following studies were presented: * Chapter 2 surveyed the business approaches

  19. Reliability Calculations

    DEFF Research Database (Denmark)

    Petersen, Kurt Erling

    1986-01-01

    Risk and reliability analysis is increasingly being used in evaluations of plant safety and plant reliability. The analysis can be performed either during the design process or during the operation time, with the purpose to improve the safety or the reliability. Due to plant complexity and safety...... and availability requirements, sophisticated tools, which are flexible and efficient, are needed. Such tools have been developed in the last 20 years and they have to be continuously refined to meet the growing requirements. Two different areas of application were analysed. In structural reliability probabilistic...... approaches have been introduced in some cases for the calculation of the reliability of structures or components. A new computer program has been developed based upon numerical integration in several variables. In systems reliability Monte Carlo simulation programs are used especially in analysis of very...

  20. A dissociation between engagement and learning: Enthusiastic instructions fail to reliably improve performance on a memory task.

    Directory of Open Access Journals (Sweden)

    Benjamin A Motz

    Full Text Available Despite widespread assertions that enthusiasm is an important quality of effective teaching, empirical research on the effect of enthusiasm on learning and memory is mixed and largely inconclusive. To help resolve these inconsistencies, we conducted a carefully-controlled laboratory experiment, investigating whether enthusiastic instructions for a memory task would improve recall accuracy. Scripted videos, either enthusiastic or neutral, were used to manipulate the delivery of task instructions. We also manipulated the sequence of learning items, replicating the spacing effect, a known cognitive technique for memory improvement. Although spaced study reliably improved test performance, we found no reliable effect of enthusiasm on memory performance across two experiments. We did, however, find that enthusiastic instructions caused participants to respond to more item prompts, leaving fewer test questions blank, an outcome typically associated with increased task motivation. We find no support for the popular claim that enthusiastic instruction will improve learning, although it may still improve engagement. This dissociation between motivation and learning is discussed, as well as its implications for education and future research on student learning.

  1. A dissociation between engagement and learning: Enthusiastic instructions fail to reliably improve performance on a memory task.

    Science.gov (United States)

    Motz, Benjamin A; de Leeuw, Joshua R; Carvalho, Paulo F; Liang, Kaley L; Goldstone, Robert L

    2017-01-01

    Despite widespread assertions that enthusiasm is an important quality of effective teaching, empirical research on the effect of enthusiasm on learning and memory is mixed and largely inconclusive. To help resolve these inconsistencies, we conducted a carefully-controlled laboratory experiment, investigating whether enthusiastic instructions for a memory task would improve recall accuracy. Scripted videos, either enthusiastic or neutral, were used to manipulate the delivery of task instructions. We also manipulated the sequence of learning items, replicating the spacing effect, a known cognitive technique for memory improvement. Although spaced study reliably improved test performance, we found no reliable effect of enthusiasm on memory performance across two experiments. We did, however, find that enthusiastic instructions caused participants to respond to more item prompts, leaving fewer test questions blank, an outcome typically associated with increased task motivation. We find no support for the popular claim that enthusiastic instruction will improve learning, although it may still improve engagement. This dissociation between motivation and learning is discussed, as well as its implications for education and future research on student learning.

  2. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Golder Associates, Inc.

    2003-04-22

    The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a

  3. Prediction method of long-term reliability in improving residual stresses by means of surface finishing

    International Nuclear Information System (INIS)

    Sera, Takehiko; Hirano, Shinro; Chigusa, Naoki; Okano, Shigetaka; Saida, Kazuyoshi; Mochizuki, Masahito; Nishimoto, Kazutoshi

    2012-01-01

    Surface finishing methods, such as Water Jet Peening (WJP), have been applied to welds in some major components of nuclear power plants as a counter measure to Primary Water Stress Corrosion Cracking (PWSCC). In addition, the methods of surface finishing (buffing treatment) is being standardized, and thus the buffing treatment has been also recognized as the well-established method of improving stress. On the other hand, the long-term stability of peening techniques has been confirmed by accelerated test. However, the effectiveness of stress improvement by surface treatment is limited to thin layers and the effect of complicated residual stress distribution in the weld metal beneath the surface is not strictly taken into account for long-term stability. This paper, therefore, describes the accelerated tests, which confirmed that the long-term stability of the layer subjected to buffing treatment was equal to that subjected to WJP. The long-term reliability of very thin stress improved layer was also confirmed through a trial evaluation by thermal elastic-plastic creep analysis, even if the effect of complicated residual stress distribution in the weld metal was excessively taken into account. Considering the above findings, an approach is proposed for constructing the prediction method of the long-term reliability of stress improvement by surface finishing. (author)

  4. Care Plan Improvement in Nursing Homes: An Integrative Review.

    Science.gov (United States)

    Mariani, Elena; Chattat, Rabih; Vernooij-Dassen, Myrra; Koopmans, Raymond; Engels, Yvonne

    2017-01-01

    Care planning nowadays is a key activity in the provision of services to nursing home residents. A care plan describes the residents' needs and the actions to address them, providing both individualized and standardized interventions and should be updated as changes in the residents' conditions occur. The aim of this review was to identify the core elements of the implementation of changes in nursing homes' care plans, by providing an overview of the type of stakeholders involved, describing the implementation strategies used, and exploring how care plans changed. An integrative literature review was used to evaluate intervention studies taking place in nursing homes. Data were collected from PubMed, CINHAL-EBSCO, and PsycINFO. English language articles published between 1995 and April 2015 were included. Data analysis followed the strategy of Knafl and Whittemore. Twenty-six articles were included. The stakeholders involved were professionals, family caregivers, and patients. Only a few studies directly involved residents and family caregivers in the quality improvement process. The implementation strategies used were technology implementation, audit, training, feedback, and supervision. The majority of interventions changed the residents' care plans in terms of developing a more standardized care documentation that primarily focuses on its quality. Only some interventions developed more tailored care plans that focus on individualized needs. Care plans generally failed in providing both standardized and personalized interventions. Efforts should be made to directly involve residents in care planning and provide professionals with efficient tools to report care goals and actions in care plans.

  5. Problems in diagnosing and forecasting power equipment reliability

    Energy Technology Data Exchange (ETDEWEB)

    Popkov, V I; Demirchyan, K S

    1979-11-01

    This general survey deals with approaches to the resolution of such problems as the gathering, analysis and systematization of data on component defects in power equipment and setting up feedback with the manufacturing plants and planning organizations to improve equipment reliability. Such efforts on the part of designers, manufacturers and operating and repair organizations in analyzing faults in 300 MW turbogenerators during 1974-1977 reduced the specific fault rate by 20 to 25% and the downtime per failure by 35 to 40%. Since power equipment should operate for several hundreds of thousands of hours (20 to 30 years) and the majority of power components have guaranteed service lives of no more than 10/sup 5/ hours, an extremely difficult problem is the determination of the reliability of equipment past the 10/sup 5/ point. The present trend in the USSR Unified Power System towards increasing the number of shutdowns and startups, which in the case of turbogenerators of up 1200 MW power can reach 7500 to 10,000 cycles is noted. Other areas briefly treated are: MHD generator reliability and economy; nuclear power plant reliability and safety; the reliability of high-power high-voltage thyristor converters; the difficulties involved in scale modeling of power system reliability and the high cost of the requisite full-scale studies; the poor understanding of long term corrosion and erosion processes. The review concludes with arguments in favor of greater computerization of all aspects of power system management.

  6. Complex method to calculate objective assessments of information systems protection to improve expert assessments reliability

    Science.gov (United States)

    Abdenov, A. Zh; Trushin, V. A.; Abdenova, G. A.

    2018-01-01

    The paper considers the questions of filling the relevant SIEM nodes based on calculations of objective assessments in order to improve the reliability of subjective expert assessments. The proposed methodology is necessary for the most accurate security risk assessment of information systems. This technique is also intended for the purpose of establishing real-time operational information protection in the enterprise information systems. Risk calculations are based on objective estimates of the adverse events implementation probabilities, predictions of the damage magnitude from information security violations. Calculations of objective assessments are necessary to increase the reliability of the proposed expert assessments.

  7. Reliability Assessment and Reliability-Based Inspection and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Ramírez, José G. Rangel; Sørensen, John Dalsgaard

    2009-01-01

    Probabilistic methodologies represent an important tool to identify the suitable strategy to inspect and deal with the deterioration in structures such as offshore wind turbines (OWT). Reliability based methods such as Risk Based Inspection (RBI) planning may represent a proper methodology to opt...

  8. Quality improvement initiatives: the missed opportunity for health plans.

    Science.gov (United States)

    Fernandez-Lopez, Sara; Lennert, Barbara

    2009-11-01

    The increase in healthcare cost without direct improvements in health outcomes, coupled with a desire to expand access to the large uninsured population, has underscored the importance of quality initiatives and organizations that provide more affordable healthcare by maximizing value. To determine the knowledge of managed care organizations about quality organizations and initiatives and to identify potential opportunities in which pharmaceutical companies could collaborate with health plans in the development and implementation of quality initiatives. We conducted a survey of 36 pharmacy directors and 15 medical directors of different plans during a Managed Care Network meeting in 2008. The represented plans cover almost 74 million lives in commercial, Medicare, and Medicaid programs, or a combination of them. The responses show limited knowledge among pharmacy and medical directors about current quality organizations and initiatives, except for quality organizations that provide health plan quality accreditation. The results also reveal an opportunity for pharmaceutical companies to collaborate with private health plans in the development of quality initiatives, especially those related to drug utilization, such as patient adherence and education and correct drug utilization. Our survey shows clearly that today's focus for managed care organizations is mostly limited to the organizations that provide health plan quality accreditation, with less focus on other organizations.

  9. Improved Reliability of Single-Phase PV Inverters by Limiting the Maximum Feed-in Power

    DEFF Research Database (Denmark)

    Yang, Yongheng; Wang, Huai; Blaabjerg, Frede

    2014-01-01

    Grid operation experiences have revealed the necessity to limit the maximum feed-in power from PV inverter systems under a high penetration scenario in order to avoid voltage and frequency instability issues. A Constant Power Generation (CPG) control method has been proposed at the inverter level...... devices, allowing a quantitative prediction of the power device lifetime. A study case on a 3 kW single-phase PV inverter has demonstrated the advantages of the CPG control in terms of improved reliability.......Grid operation experiences have revealed the necessity to limit the maximum feed-in power from PV inverter systems under a high penetration scenario in order to avoid voltage and frequency instability issues. A Constant Power Generation (CPG) control method has been proposed at the inverter level....... The CPG control strategy is activated only when the DC input power from PV panels exceeds a specific power limit. It enables to limit the maximum feed-in power to the electric grids and also to improve the utilization of PV inverters. As a further study, this paper investigates the reliability performance...

  10. HUMAN RELIABILITY ANALYSIS DENGAN PENDEKATAN COGNITIVE RELIABILITY AND ERROR ANALYSIS METHOD (CREAM

    Directory of Open Access Journals (Sweden)

    Zahirah Alifia Maulida

    2015-01-01

    Full Text Available Kecelakaan kerja pada bidang grinding dan welding menempati urutan tertinggi selama lima tahun terakhir di PT. X. Kecelakaan ini disebabkan oleh human error. Human error terjadi karena pengaruh lingkungan kerja fisik dan non fisik.Penelitian kali menggunakan skenario untuk memprediksi serta mengurangi kemungkinan terjadinya error pada manusia dengan pendekatan CREAM (Cognitive Reliability and Error Analysis Method. CREAM adalah salah satu metode human reliability analysis yang berfungsi untuk mendapatkan nilai Cognitive Failure Probability (CFP yang dapat dilakukan dengan dua cara yaitu basic method dan extended method. Pada basic method hanya akan didapatkan nilai failure probabailty secara umum, sedangkan untuk extended method akan didapatkan CFP untuk setiap task. Hasil penelitian menunjukkan faktor- faktor yang mempengaruhi timbulnya error pada pekerjaan grinding dan welding adalah kecukupan organisasi, kecukupan dari Man Machine Interface (MMI & dukungan operasional, ketersediaan prosedur/ perencanaan, serta kecukupan pelatihan dan pengalaman. Aspek kognitif pada pekerjaan grinding yang memiliki nilai error paling tinggi adalah planning dengan nilai CFP 0.3 dan pada pekerjaan welding yaitu aspek kognitif execution dengan nilai CFP 0.18. Sebagai upaya untuk mengurangi nilai error kognitif pada pekerjaan grinding dan welding rekomendasi yang diberikan adalah memberikan training secara rutin, work instrucstion yang lebih rinci dan memberikan sosialisasi alat. Kata kunci: CREAM (cognitive reliability and error analysis method, HRA (human reliability analysis, cognitive error Abstract The accidents in grinding and welding sectors were the highest cases over the last five years in PT. X and it caused by human error. Human error occurs due to the influence of working environment both physically and non-physically. This study will implement an approaching scenario called CREAM (Cognitive Reliability and Error Analysis Method. CREAM is one of human

  11. Supply chain reliability modelling

    Directory of Open Access Journals (Sweden)

    Eugen Zaitsev

    2012-03-01

    Full Text Available Background: Today it is virtually impossible to operate alone on the international level in the logistics business. This promotes the establishment and development of new integrated business entities - logistic operators. However, such cooperation within a supply chain creates also many problems related to the supply chain reliability as well as the optimization of the supplies planning. The aim of this paper was to develop and formulate the mathematical model and algorithms to find the optimum plan of supplies by using economic criterion and the model for the probability evaluating of non-failure operation of supply chain. Methods: The mathematical model and algorithms to find the optimum plan of supplies were developed and formulated by using economic criterion and the model for the probability evaluating of non-failure operation of supply chain. Results and conclusions: The problem of ensuring failure-free performance of goods supply channel analyzed in the paper is characteristic of distributed network systems that make active use of business process outsourcing technologies. The complex planning problem occurring in such systems that requires taking into account the consumer's requirements for failure-free performance in terms of supply volumes and correctness can be reduced to a relatively simple linear programming problem through logical analysis of the structures. The sequence of the operations, which should be taken into account during the process of the supply planning with the supplier's functional reliability, was presented.

  12. Using storyboards to make your performance improvement plan come alive.

    Science.gov (United States)

    Pfaadt, M

    1998-01-01

    The key to successfully using storyboarding within the PI plan is to create a storyboard for each activity as it is completed. Our agency waited until JCAHO was almost upon us. The historical preservation of activities as they occur will create an archive of activities for your PI committee and staff as well as for surveyors. The storyboard's second purpose is the communication of activities to the staff. Take the opportunity to use the boards as educational activities for the staff. Performance Improvement can many times be a frightening, or at best frustrating and uncomfortable activity for staff personnel. Bringing the PI plan alive through the use of storyboards accomplishes many goals as well as helps all staff see how Performance Improvement really makes a difference.

  13. Fuel R and D to improve fuel reliability

    International Nuclear Information System (INIS)

    Yang, Rosa; Cheng, Bo; Deshon, Jeff; Edsinger, Kurt; Ozer, Odelli

    2006-01-01

    Light water reactor fuel is operating in an increasingly challenging environment. Fuel burnup extension and cycle length increase both can increase the local duty. Reactor water chemistry modifications for the purpose of protection the plant system materials have the potential of increasing fuel surface deposition and cladding corrosion and hydriding. The status of fuel performance in US reactors is summarized and an update of the Fuel Reliability Program' established by the utility industry to ensure reliability is provided. (author)

  14. Operating experience and reliability improvements on the 5 kW CW klystron at Jefferson Lab

    International Nuclear Information System (INIS)

    Nelson, R.; Holben, S.

    1997-01-01

    With substantial operating hours on the RF system, considerable information on reliability of the 5 kW CW klystrons has been obtained. High early failure rates led to examination of the operating conditions and failure modes. Internal ceramic contamination caused premature failure of gun potting material and ultimate tube demise through arcing or ceramic fracture. A planned course of reporting and reconditioning of approximately 300 klystrons, plus careful attention to operating conditions and periodic analysis of operational data, has substantially reduced the failure rate. It is anticipated that implementation of planned supplemental monitoring systems for the klystrons will allow most catastrophic failures to be avoided. By predicting end of life, tubes can be changed out before they fail, thus minimizing unplanned downtime. Initial tests have also been conducted on this same klystron operated at higher voltages with resultant higher output power. The outcome of these tests will provide information to be considered for future upgrades to the accelerator

  15. The Effect of School Improvement Planning on Student Achievement

    Science.gov (United States)

    Huber, David J.; Conway, James M.

    2015-01-01

    This study evaluated the hypothesis that schools in Connecticut's Alliance Districts (lowest-performing districts) with higher-quality school improvement plans (SIPs) would have higher levels of student achievement. An exploratory research question evaluated whether SIPs predicted achievement of particular subgroups. SIPs were obtained and scored…

  16. Engineering of electrical systems of nuclear power stations for improved reliability

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Ramanathan, K.; Choudhary, N.N.

    1977-01-01

    Operational problems experienced in electrical systems/equipment of the Tarapur Atomic Power Station (TAPS) and the Rajasthan Atomic Power Station (RAPS) and their solutions are dealt in detail. This experience has led to new design concepts which are being introduced for improved reliability in design of the Madras Atomic Power Project (MAPP) and the Narora Atomic Power Project (NAPP). Saline pollution on switchyard equipments was the major problem of the TAPS due to its coastal location. Saline pollution resulted in flash over of insulators and failure of clamps. The problem was solved by suitable changes in insulators, conductors, transformers, switches and arranging portable live line washing of the switchyard equipment. In MAPP which is also located on coast, an indoor switchyard is built. NAPP is located in a seismic zone, therefore, all equipment is specified for appropriate seismic duty. Various other improvements are described. (M.G.B.)

  17. Development of a Comprehensive and Interactive Tool to Inform State Violence and Injury Prevention Plans.

    Science.gov (United States)

    Wilson, Lauren; Deokar, Angela J; Zaesim, Araya; Thomas, Karen; Kresnow-Sedacca, Marcie-Jo

    The Center of Disease Control and Prevention's Core State Violence and Injury Prevention Program (Core SVIPP) provides an opportunity for states to engage with their partners to implement, evaluate, and disseminate strategies that lead to the reduction and prevention of injury and violence. Core SVIPP requires awardees to develop or update their state injury and violence plans. Currently, literature informing state planning efforts is limited, especially regarding materials related to injury and violence. Presumably, plans that are higher quality result in having a greater impact on preventing injury and violence, and literature to improve quality would benefit prevention programming. (1) To create a comprehensive injury-specific index to aid in the development and revision of state injury and violence prevention plans, and (2) to assess the reliability and utility of this index. Through an iterative development process, a workgroup of subject matter experts created the Violence and Injury Prevention: Comprehensive Index Tool (VIP:CIT). The tool was pilot tested on 3 state injury and violence prevention plans and assessed for initial usability. Following revisions to the tool (ie, a rubric was developed to further delineate consistent criteria for rating; items were added and clarified), the same state plans were reassessed to test interrater reliability and tool utility. For the second assessment, reliability of the VIP:CIT improved, indicating that the rubric was a useful addition. Qualitative feedback from states suggested that the tool significantly helped guide plan development and communicate about planning processes. The final VIP:CIT is a tool that can help increase plan quality, decrease the research-to-practice gap, and increase connectivity to emerging public health paradigms. The tool provides an example of tailoring guidance materials to reflect academic literature, and it can be easily adapted to other topic areas to promote quality of strategic plans

  18. Assessments and applications to enhance human reliability and reduce risk during less-than-full-power operations

    International Nuclear Information System (INIS)

    Hannaman, G.W.; Singh, A.

    1992-01-01

    Study of events, interviews with plant personnel, and applications of risk studies indicate that the risk of a potential accident during less-than-full-power (LTFP) operation is becoming a greater fraction of the risk as improvements are made to the full-power operations. Industry efforts have been increased to reduce risk and the cost of shutdown operations. These efforts consider the development and application of advanced tools to help utilities proactively identify issues and develop contingencies and interventions to enhance reliability and reduce risk of low-power operations at nuclear power plants. The role for human reliability assessments is to help improve utility outage planning to better achieve schedule and risk control objectives. Improvements are expected to include intervention tools to identify and reduce human error, definition of new instructional modules, and prioritization of risk reduction issues for operators. The Electric Power Research Institute is sponsoring a project to address the identification and quantification of factors that affect human reliability during LTFP operation of nuclear power plants. The results of this project are expected to promote the development of proactively applied interventions and contingencies for enhanced human reliability during shutdown operations

  19. Effective energy planning for improving the enterprise’s energy performance

    Directory of Open Access Journals (Sweden)

    Păunescu Carmen

    2016-09-01

    Full Text Available The global pressing need to protect the environment, save energy and reduce greenhouse gas emissions worldwide has prompted the enterprises to implementing both individual energy saving measures and a more systematic approach to improve the overall enterprise’s energy performance. Energy management is becoming a priority as enterprises strive to reduce energy costs, conform to regulatory requirements, and improve their corporate image. As such, enterprises are encouraged to manage their energy related matters in a systematic manner and a more harmonized way, to ensure continual improvement on their energy efficiency. Despite the increasing interest in energy management standards, a gap persists between energy management literature and current implementation practices. The release of the ISO 50001 international standard was meant to help the organizations develop sound energy management systems and effective process-based energy management structures that could be recognized through third-party certification. Building on the energy management literature and energy management standards, the current paper presents the essential steps the enterprises should take to practically design a sustainable energy management system. Also, by using multiple case studies of enterprises that have implemented an ISO 50001 energy management system, it introduces a structured approach that companies can use to effectively develop their energy planning and improve energy performance. The key components of the enterprise’s energy planning are discussed, as well as practical examples of energy objectives and performance indicators from various industries are offered. The paper shows that by establishing an effective energy planning system, this will efficiently meet demands for achieving energy performance indicators and international certification.

  20. National plan to enhance aviation safety through human factors improvements

    Science.gov (United States)

    Foushee, Clay

    1990-01-01

    The purpose of this section of the plan is to establish a development and implementation strategy plan for improving safety and efficiency in the Air Traffic Control (ATC) system. These improvements will be achieved through the proper applications of human factors considerations to the present and future systems. The program will have four basic goals: (1) prepare for the future system through proper hiring and training; (2) develop a controller work station team concept (managing human errors); (3) understand and address the human factors implications of negative system results; and (4) define the proper division of responsibilities and interactions between the human and the machine in ATC systems. This plan addresses six program elements which together address the overall purpose. The six program elements are: (1) determine principles of human-centered automation that will enhance aviation safety and the efficiency of the air traffic controller; (2) provide new and/or enhanced methods and techniques to measure, assess, and improve human performance in the ATC environment; (3) determine system needs and methods for information transfer between and within controller teams and between controller teams and the cockpit; (4) determine how new controller work station technology can optimally be applied and integrated to enhance safety and efficiency; (5) assess training needs and develop improved techniques and strategies for selection, training, and evaluation of controllers; and (6) develop standards, methods, and procedures for the certification and validation of human engineering in the design, testing, and implementation of any hardware or software system element which affects information flow to or from the human.

  1. Reliability evaluation of power systems

    CERN Document Server

    Billinton, Roy

    1996-01-01

    The Second Edition of this well-received textbook presents over a decade of new research in power system reliability-while maintaining the general concept, structure, and style of the original volume. This edition features new chapters on the growing areas of Monte Carlo simulation and reliability economics. In addition, chapters cover the latest developments in techniques and their application to real problems. The text also explores the progress occurring in the structure, planning, and operation of real power systems due to changing ownership, regulation, and access. This work serves as a companion volume to Reliability Evaluation of Engineering Systems: Second Edition (1992).

  2. ANALYSIS OF AVAILABILITY AND RELIABILITY IN RHIC OPERATIONS

    International Nuclear Information System (INIS)

    PILAT, F.; INGRASSIA, P.; MICHNOFF, R.

    2006-01-01

    RHIC has been successfully operated for 5 years as a collider for different species, ranging from heavy ions including gold and copper, to polarized protons. We present a critical analysis of reliability data for RHIC that not only identifies the principal factors limiting availability but also evaluates critical choices at design times and assess their impact on present machine performance. RHIC availability data are typical when compared to similar high-energy colliders. The critical analysis of operations data is the basis for studies and plans to improve RHIC machine availability beyond the 50-60% typical of high-energy colliders

  3. [Reliability theory based on quality risk network analysis for Chinese medicine injection].

    Science.gov (United States)

    Li, Zheng; Kang, Li-Yuan; Fan, Xiao-Hui

    2014-08-01

    A new risk analysis method based upon reliability theory was introduced in this paper for the quality risk management of Chinese medicine injection manufacturing plants. The risk events including both cause and effect ones were derived in the framework as nodes with a Bayesian network analysis approach. It thus transforms the risk analysis results from failure mode and effect analysis (FMEA) into a Bayesian network platform. With its structure and parameters determined, the network can be used to evaluate the system reliability quantitatively with probabilistic analytical appraoches. Using network analysis tools such as GeNie and AgenaRisk, we are able to find the nodes that are most critical to influence the system reliability. The importance of each node to the system can be quantitatively evaluated by calculating the effect of the node on the overall risk, and minimization plan can be determined accordingly to reduce their influences and improve the system reliability. Using the Shengmai injection manufacturing plant of SZYY Ltd as a user case, we analyzed the quality risk with both static FMEA analysis and dynamic Bayesian Network analysis. The potential risk factors for the quality of Shengmai injection manufacturing were identified with the network analysis platform. Quality assurance actions were further defined to reduce the risk and improve the product quality.

  4. Improving IMRT delivery efficiency with reweighted L1-minimization for inverse planning

    International Nuclear Information System (INIS)

    Kim, Hojin; Becker, Stephen; Lee, Rena; Lee, Soonhyouk; Shin, Sukyoung; Candès, Emmanuel; Xing Lei; Li Ruijiang

    2013-01-01

    Purpose: This study presents an improved technique to further simplify the fluence-map in intensity modulated radiation therapy (IMRT) inverse planning, thereby reducing plan complexity and improving delivery efficiency, while maintaining the plan quality.Methods: First-order total-variation (TV) minimization (min.) based on L1-norm has been proposed to reduce the complexity of fluence-map in IMRT by generating sparse fluence-map variations. However, with stronger dose sparing to the critical structures, the inevitable increase in the fluence-map complexity can lead to inefficient dose delivery. Theoretically, L0-min. is the ideal solution for the sparse signal recovery problem, yet practically intractable due to its nonconvexity of the objective function. As an alternative, the authors use the iteratively reweighted L1-min. technique to incorporate the benefits of the L0-norm into the tractability of L1-min. The weight multiplied to each element is inversely related to the magnitude of the corresponding element, which is iteratively updated by the reweighting process. The proposed penalizing process combined with TV min. further improves sparsity in the fluence-map variations, hence ultimately enhancing the delivery efficiency. To validate the proposed method, this work compares three treatment plans obtained from quadratic min. (generally used in clinic IMRT), conventional TV min., and our proposed reweighted TV min. techniques, implemented by a large-scale L1-solver (template for first-order conic solver), for five patient clinical data. Criteria such as conformation number (CN), modulation index (MI), and estimated treatment time are employed to assess the relationship between the plan quality and delivery efficiency.Results: The proposed method yields simpler fluence-maps than the quadratic and conventional TV based techniques. To attain a given CN and dose sparing to the critical organs for 5 clinical cases, the proposed method reduces the number of segments

  5. Improving IMRT delivery efficiency with reweighted L1-minimization for inverse planning

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hojin [Department of Radiation Oncology, Stanford University, Stanford, California 94305-5847 and Department of Electrical Engineering, Stanford University, Stanford, California 94305-9505 (United States); Becker, Stephen [Laboratoire Jacques-Louis Lions, Universite Pierre et Marie Curie, Paris 6, 75005 France (France); Lee, Rena; Lee, Soonhyouk [Department of Radiation Oncology, School of Medicine, Ewha Womans University, Seoul 158-710 (Korea, Republic of); Shin, Sukyoung [Medtronic CV RDN R and D, Santa Rosa, California 95403 (United States); Candes, Emmanuel [Department of Statistics, Stanford University, Stanford, California 94305-4065 (United States); Xing Lei; Li Ruijiang [Department of Radiation Oncology, Stanford University, Stanford, California 94305-5304 (United States)

    2013-07-15

    Purpose: This study presents an improved technique to further simplify the fluence-map in intensity modulated radiation therapy (IMRT) inverse planning, thereby reducing plan complexity and improving delivery efficiency, while maintaining the plan quality.Methods: First-order total-variation (TV) minimization (min.) based on L1-norm has been proposed to reduce the complexity of fluence-map in IMRT by generating sparse fluence-map variations. However, with stronger dose sparing to the critical structures, the inevitable increase in the fluence-map complexity can lead to inefficient dose delivery. Theoretically, L0-min. is the ideal solution for the sparse signal recovery problem, yet practically intractable due to its nonconvexity of the objective function. As an alternative, the authors use the iteratively reweighted L1-min. technique to incorporate the benefits of the L0-norm into the tractability of L1-min. The weight multiplied to each element is inversely related to the magnitude of the corresponding element, which is iteratively updated by the reweighting process. The proposed penalizing process combined with TV min. further improves sparsity in the fluence-map variations, hence ultimately enhancing the delivery efficiency. To validate the proposed method, this work compares three treatment plans obtained from quadratic min. (generally used in clinic IMRT), conventional TV min., and our proposed reweighted TV min. techniques, implemented by a large-scale L1-solver (template for first-order conic solver), for five patient clinical data. Criteria such as conformation number (CN), modulation index (MI), and estimated treatment time are employed to assess the relationship between the plan quality and delivery efficiency.Results: The proposed method yields simpler fluence-maps than the quadratic and conventional TV based techniques. To attain a given CN and dose sparing to the critical organs for 5 clinical cases, the proposed method reduces the number of segments

  6. 2015 NREL Photovoltaic Module Reliability Workshops

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Sarah [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-14

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  7. 2016 NREL Photovoltaic Module Reliability Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Sarah [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-07

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology - both critical goals for moving PV technologies deeper into the electricity marketplace.

  8. Reliability evaluation of smart distribution grids

    OpenAIRE

    Kazemi, Shahram

    2011-01-01

    The term "Smart Grid" generally refers to a power grid equipped with the advanced technologies dedicated for purposes such as reliability improvement, ease of control and management, integrating of distributed energy resources and electricity market operations. Improving the reliability of electric power delivered to the end users is one of the main targets of employing smart grid technologies. The smart grid investments targeted for reliability improvement can be directed toward the generati...

  9. ARTIFICIAL INTELLIGENCE CAPABILITIES FOR INCREASING ORGANIZATIONAL-TECHNOLOGICAL RELIABILITY OF CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Ginzburg Alexander Vital`evich

    2018-02-01

    Full Text Available The technology of artificial intelligence is actively being mastered in the world but there is not much talk about the capabilities of artificial intelligence in construction industry and this issue requires additional elaboration. As a rule, the decision to invest in a particular construction project is made on the basis of an assessment of the organizational and technological reliability of the construction process. Artificial intelligence can be a convenient quality tool for identifying, analyzing and subsequent control of the “pure” risks of the construction project, which not only will significantly reduce the financial and time expenditures for the investor’s decision-making process but also improve the organizational-technological reliability of the construction process as a whole. Subject: the algorithm of creation of artificial intelligence in the field of identification and analysis of potential risk events is presented, which will facilitate the creation of an independent analytical system for different stages of construction production: from the sketch to the working documentation and conduction of works directly on the construction site. Research objectives: the study of the possibility, methods and planning of the algorithm of works for creation of artificial intelligence technology in order to improve the organizational-technological reliability of the construction process. Materials and methods: the developments in the field of improving the organizational and technological reliability of construction were studied through the analysis and control of potential “pure” risks of the construction project, and the work was also carried out to integrate the technology of artificial intelligence into the area being studied. Results: An algorithm for creating artificial intelligence in the field of identification of potential “pure” risks of construction projects was presented. Conclusions: the obtained results are useful

  10. Is it possible for knowledge-based planning to improve intensity modulated radiation therapy plan quality for planners with different planning experiences in left-sided breast cancer patients?

    Science.gov (United States)

    Wang, Juanqi; Hu, Weigang; Yang, Zhaozhi; Chen, Xiaohui; Wu, Zhiqiang; Yu, Xiaoli; Guo, Xiaomao; Lu, Saiquan; Li, Kaixuan; Yu, Gongyi

    2017-05-22

    Knowledge-based planning (KBP) is a promising technique that can improve plan quality and increase planning efficiency. However, no attempts have been made to extend the domain of KBP for planners with different planning experiences so far. The purpose of this study was to quantify the potential gains for planners with different planning experiences after implementing KBP in intensity modulated radiation therapy (IMRT) plans for left-sided breast cancer patients. The model libraries were populated with 80 expert clinical plans from treated patients who previously received left-sided breast-conserving surgery and IMRT with simultaneously integrated boost. The libraries were created on the RapidPlan TM . 6 planners with different planning experiences (2 beginner planners, 2 junior planners and 2 senior planners) generated manual and KBP optimized plans for additional 10 patients, similar to those included in the model libraries. The plan qualities were compared between manual and KBP plans. All plans were capable of achieving the prescription requirement. There were almost no statistically significant differences in terms of the planning target volume (PTV) coverage and dose conformality. It was demonstrated that the doses for most of organs-at-risk (OARs) were on average lower or equal in KBP plans compared to manual plans except for the senior planners, where the very small differences were not statistically significant. KBP data showed a systematic trend to have superior dose sparing at most parameters for the heart and ipsilateral lung. The observed decrease in the doses to these OARs could be achieved, particularly for the beginner and junior planners. Many differences were statistically significant. It is feasible to generate acceptable IMRT plans after implementing KBP for left-sided breast cancer. KBP helps to effectively improve the quality of IMRT plans against the benchmark of manual plans for less experienced planners without any manual intervention. KBP

  11. Planning ability improves in a yogic education system compared to a modern.

    Science.gov (United States)

    Rangan, R; Nagendra, H R; Bhat, G Ramachandra

    2008-07-01

    Planning skills play a key role in higher developmental processes. The Tower of London test not only measures planning skills, but also the ability to execute plans. Yoga practices aim to bring about higher development. Can a Yoga-based education system be shown to meet this challenge? This study was aimed at comparing a Modern Education System (MES) with the ancient Yoga-based system of education, the Gurukula Education System (GES), in developing planning skills. Forty-nine boys with ages ranging from 11 to 13 years were selected from each of two residential schools, one MES and the other GES, providing similar ambience and daily routines. The boys were matched for age and socio-economic status. The GES educational program is based around integrated yoga modules while the MES provides a conventional modern education program. Planning and executive abilities were assessed using the Tower of London test at the start and the end of an academic year. Within groups, the pre-post test differences were significant for both groups. However, the between-groups results showed improvement in the GES group compared to the MES group at a P education improve planning and execution skills in school boys, GES is more effective of the two systems.

  12. Planned Improvements for the WB-57F Aircraft

    Science.gov (United States)

    Baccus, S.; Roberts, A.; Ross, M.

    2003-12-01

    NASA WB-57F aircraft have supported the atmospheric science community for over 30 years. Recent attention has focused on the chemistry and dynamics of the UTLS region of the atmosphere and several NASA sponsored field campaigns (ACCENT, CRYSTAL-FACE) have made critical use of the WB-57F's unique ability to carry large (3 ton) payloads during extended cruise at all altitudes from the lower troposphere to the lower stratosphere (20 km ceiling). In addition, the WB-57F's robust structure permits a large number and variety of instruments to be carried at inlet-favorable locations on the aircraft. In order to further improve the WB-57F's performance and unique utility to the atmospheric research and spacecraft validation communities, NASA is planning several upgrades to the WB-57F including state-of-the-art avionics and autopilot, landing gear replacement, maximum gross weight increase, engine replacement, and ultrapod installation. We will review the present WB-57F performance, plans for upcoming science campaigns, and plans for increased WB-57F payload, range, endurance, and ceiling resulting from the upgrades.

  13. Reliability analysis of the solar array based on Fault Tree Analysis

    International Nuclear Information System (INIS)

    Wu Jianing; Yan Shaoze

    2011-01-01

    The solar array is an important device used in the spacecraft, which influences the quality of in-orbit operation of the spacecraft and even the launches. This paper analyzes the reliability of the mechanical system and certifies the most vital subsystem of the solar array. The fault tree analysis (FTA) model is established according to the operating process of the mechanical system based on DFH-3 satellite; the logical expression of the top event is obtained by Boolean algebra and the reliability of the solar array is calculated. The conclusion shows that the hinges are the most vital links between the solar arrays. By analyzing the structure importance(SI) of the hinge's FTA model, some fatal causes, including faults of the seal, insufficient torque of the locking spring, temperature in space, and friction force, can be identified. Damage is the initial stage of the fault, so limiting damage is significant to prevent faults. Furthermore, recommendations for improving reliability associated with damage limitation are discussed, which can be used for the redesigning of the solar array and the reliability growth planning.

  14. Reliability analysis of the solar array based on Fault Tree Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Wu Jianing; Yan Shaoze, E-mail: yansz@mail.tsinghua.edu.cn [State Key Laboratory of Tribology, Department of Precision Instruments and Mechanology, Tsinghua University,Beijing 100084 (China)

    2011-07-19

    The solar array is an important device used in the spacecraft, which influences the quality of in-orbit operation of the spacecraft and even the launches. This paper analyzes the reliability of the mechanical system and certifies the most vital subsystem of the solar array. The fault tree analysis (FTA) model is established according to the operating process of the mechanical system based on DFH-3 satellite; the logical expression of the top event is obtained by Boolean algebra and the reliability of the solar array is calculated. The conclusion shows that the hinges are the most vital links between the solar arrays. By analyzing the structure importance(SI) of the hinge's FTA model, some fatal causes, including faults of the seal, insufficient torque of the locking spring, temperature in space, and friction force, can be identified. Damage is the initial stage of the fault, so limiting damage is significant to prevent faults. Furthermore, recommendations for improving reliability associated with damage limitation are discussed, which can be used for the redesigning of the solar array and the reliability growth planning.

  15. Coupling the biophysical and social dimensions of wildfire risk to improve wildfire mitigation planning

    Science.gov (United States)

    Alan A. Ager; Jeffrey D. Kline; A. Paige Fisher

    2015-01-01

    We describe recent advances in biophysical and social aspects of risk and their potential combined contribution to improve mitigation planning on fire-prone landscapes. The methods and tools provide an improved method for defining the spatial extent of wildfire risk to communities compared to current planning processes. They also propose an expanded role for social...

  16. Use of knowledge based systems for rational reliability analysis based inspection and maintenance planning for offshore structures

    International Nuclear Information System (INIS)

    Tang, M.X.; Dharmavasan, S.; Peers, S.M.C.

    1994-01-01

    The structural integrity of fixed offshore platforms is ensured by periodic inspections. In the past, decisions made as to when, where and how to inspect have been made by engineers using rules-of-thumb and general planning heuristics. It is now hoped that more rational inspection and maintenance scheduling may be carried out by applying recently developed techniques based on structural reliability methods. However, one of the problems associated with a theoretical approach is that it is not always possible to incorporate all the constraints that are present in a practical situation. These constraints modify the decisions made for analysis data input and the interpretation of the analysis results. Knowledge based systems provide a mean of encapsulating several different forms of information and knowledge within a computer system and hence can overcome this problem. In this paper, a prototype system being developed for integrating reliability based analysis with other constraints for inspection scheduling will be described. In addition, the scheduling model and the algorithms to carry out the scheduling will be explained. Furthermore, implementation details are also given

  17. High-temperature gas-cooled reactor safety-reliability program plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The purpose of this document is to present a safety plan as part of an overall program plan for the design and development of the High Temperature Gas-Cooled Reactor (HTGR). This plan is intended to establish a logical framework for identifying the technology necessary to demonstrate that the requisite degree of public risk safety can be achieved economically. This plan provides a coherent system safety approach together with goals and success criterion as part of a unifying strategy for licensing a lead reactor plant in the near term. It is intended to provide guidance to program participants involved in producing a technology base for the HTGR that is fully responsive to safety consideration in the design, evaluation, licensing, public acceptance, and economic optimization of reactor systems.

  18. PV Systems Reliability Final Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Lavrova, Olga [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Flicker, Jack David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Johnson, Jay [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Armijo, Kenneth Miguel [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gonzalez, Sigifredo [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Schindelholz, Eric John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sorensen, Neil R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Yang, Benjamin Bing-Yeh [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-12-01

    The continued exponential growth of photovoltaic technologies paves a path to a solar-powered world, but requires continued progress toward low-cost, high-reliability, high-performance photovoltaic (PV) systems. High reliability is an essential element in achieving low-cost solar electricity by reducing operation and maintenance (O&M) costs and extending system lifetime and availability, but these attributes are difficult to verify at the time of installation. Utilities, financiers, homeowners, and planners are demanding this information in order to evaluate their financial risk as a prerequisite to large investments. Reliability research and development (R&D) is needed to build market confidence by improving product reliability and by improving predictions of system availability, O&M cost, and lifetime. This project is focused on understanding, predicting, and improving the reliability of PV systems. The two areas being pursued include PV arc-fault and ground fault issues, and inverter reliability.

  19. [Examination of safety improvement by failure record analysis that uses reliability engineering].

    Science.gov (United States)

    Kato, Kyoichi; Sato, Hisaya; Abe, Yoshihisa; Ishimori, Yoshiyuki; Hirano, Hiroshi; Higashimura, Kyoji; Amauchi, Hiroshi; Yanakita, Takashi; Kikuchi, Kei; Nakazawa, Yasuo

    2010-08-20

    How the maintenance checks of the medical treatment system, including start of work check and the ending check, was effective for preventive maintenance and the safety improvement was verified. In this research, date on the failure of devices in multiple facilities was collected, and the data of the trouble repair record was analyzed by the technique of reliability engineering. An analysis of data on the system (8 general systems, 6 Angio systems, 11 CT systems, 8 MRI systems, 8 RI systems, and the radiation therapy system 9) used in eight hospitals was performed. The data collection period assumed nine months from April to December 2008. Seven items were analyzed. (1) Mean time between failures (MTBF) (2) Mean time to repair (MTTR) (3) Mean down time (MDT) (4) Number found by check in morning (5) Failure generation time according to modality. The classification of the breakdowns per device, the incidence, and the tendency could be understood by introducing reliability engineering. Analysis, evaluation, and feedback on the failure generation history are useful to keep downtime to a minimum and to ensure safety.

  20. Integrated reliability condition monitoring and maintenance of equipment

    CERN Document Server

    Osarenren, John

    2015-01-01

    Consider a Viable and Cost-Effective Platform for the Industries of the Future (IOF) Benefit from improved safety, performance, and product deliveries to your customers. Achieve a higher rate of equipment availability, performance, product quality, and reliability. Integrated Reliability: Condition Monitoring and Maintenance of Equipment incorporates reliable engineering and mathematical modeling to help you move toward sustainable development in reliability condition monitoring and maintenance. This text introduces a cost-effective integrated reliability growth monitor, integrated reliability degradation monitor, technological inheritance coefficient sensors, and a maintenance tool that supplies real-time information for predicting and preventing potential failures of manufacturing processes and equipment. The author highlights five key elements that are essential to any improvement program: improving overall equipment and part effectiveness, quality, and reliability; improving process performance with maint...

  1. Safe teleoperation based on flexible intraoperative planning for robot-assisted laser microsurgery.

    Science.gov (United States)

    Mattos, Leonardo S; Caldwell, Darwin G

    2012-01-01

    This paper describes a new intraoperative planning system created to improve precision and safety in teleoperated laser microsurgeries. It addresses major safety issues related to real-time control of a surgical laser during teleoperated procedures, which are related to the reliability and robustness of the telecommunication channels. Here, a safe solution is presented, consisting in a new planning system architecture that maintains the flexibility and benefits of real-time teleoperation and keeps the surgeon in control of all surgical actions. The developed system is based on our virtual scalpel system for robot-assisted laser microsurgery, and allows the intuitive use of stylus to create surgical plans directly over live video of the surgical field. In this case, surgical plans are defined as graphic objects overlaid on the live video, which can be easily modified or replaced as needed, and which are transmitted to the main surgical system controller for subsequent safe execution. In the process of improving safety, this new planning system also resulted in improved laser aiming precision and improved capability for higher quality laser procedures, both due to the new surgical plan execution module, which allows very fast and precise laser aiming control. Experimental results presented herein show that, in addition to the safety improvements, the new planning system resulted in a 48% improvement in laser aiming precision when compared to the previous virtual scalpel system.

  2. Three-dimensional planning and use of patient-specific guides improve glenoid component position: an in vitro study.

    Science.gov (United States)

    Walch, Gilles; Vezeridis, Peter S; Boileau, Pascal; Deransart, Pierric; Chaoui, Jean

    2015-02-01

    Glenoid component positioning is a key factor for success in total shoulder arthroplasty. Three-dimensional (3D) measurements of glenoid retroversion, inclination, and humeral head subluxation are helpful tools for preoperative planning. The purpose of this study was to assess the reliability and precision of a novel surgical method for placing the glenoid component with use of patient-specific templates created by preoperative surgical planning and 3D modeling. A preoperative computed tomography examination of cadaveric scapulae (N = 18) was performed. The glenoid implants were virtually placed, and patient-specific guides were created to direct the guide pin into the desired orientation and position in the glenoid. The 3D orientation and position of the guide pin were evaluated by performing a postoperative computed tomography scan for each scapula. The differences between the preoperative planning and the achieved result were analyzed. The mean error in 3D orientation of the guide pin was 2.39°, the mean entry point position error was 1.05 mm, and the mean inclination angle error was 1.42°. The average error in the version angle was 1.64°. There were no technical difficulties or complications related to use of patient-specific guides for guide pin placement. Quantitative analysis of guide pin positioning demonstrated a good correlation between preoperative planning and the achieved position of the guide pin. This study demonstrates the reliability and precision of preoperative planning software and patient-specific guides for glenoid component placement in total shoulder arthroplasty. Copyright © 2015. Published by Elsevier Inc.

  3. Follow-up of CT-derived airway wall thickness : Correcting for changes in inspiration level improves reliability

    NARCIS (Netherlands)

    Pompe, Esther; van Rikxoort, Eva M; Mets, Onno M; Charbonnier, Jean-Paul; Kuhnigk, Jan-Martin; de Koning, Harry J; Oudkerk, Matthijs; Vliegenthart, Rozemarijn; Zanen, Pieter; Lammers, Jan-Willem J; van Ginneken, Bram; de Jong, Pim A; Mohamed Hoesein, Firdaus A A

    2016-01-01

    OBJECTIVES: Airway wall thickness (AWT) is affected by changes in lung volume. This study evaluated whether correcting AWT on computed tomography (CT) for differences in inspiration level improves measurement agreement, reliability, and power to detect changes over time. METHODS: Participants of the

  4. Follow-up of CT-derived airway wall thickness : Correcting for changes in inspiration level improves reliability

    NARCIS (Netherlands)

    Pompe, Esther; van Rikxoort, Eva M.; Mets, Onno M.; Charbonnier, Jean-Paul; Kuhnigk, Jan-Martin; de Koning, Harry J.; Oudkerk, Matthijs; Vliegenthart, Rozemarijn; Zanen, Pieter; Lammers, Jan-Willem J.; van Ginneken, Bram; de Jong, Pim A.; Hoesein, Firdaus A. A. Mohamed

    2016-01-01

    Objectives: Airway wall thickness (AWT) is affected by changes in lung volume. This study evaluated whether correcting AWT on computed tomography (CT) for differences in inspiration level improves measurement agreement, reliability, and power to detect changes over time. Methods: Participants of the

  5. Reliability Analysis of Fatigue Fracture of Wind Turbine Drivetrain Components

    DEFF Research Database (Denmark)

    Berzonskis, Arvydas; Sørensen, John Dalsgaard

    2016-01-01

    in the volume of the casted ductile iron main shaft, on the reliability of the component. The probabilistic reliability analysis conducted is based on fracture mechanics models. Additionally, the utilization of the probabilistic reliability for operation and maintenance planning and quality control is discussed....

  6. Outage preparation milestones - A tool to improve planned outage performance

    International Nuclear Information System (INIS)

    Laplatney, Jere; Hwang, Euiyoub

    2006-01-01

    Sustainable development of Nuclear Energy depends heavily on excellent performance of the existing fleet which in turn depend heavily on the performance of planned outages. Nuclear Power Plants who have successfully undertaken outage optimization projects have demonstrated than an effective Outage Preparation Milestone program is a key component of their improvement programs. This paper will provide background into the field of 'Outage Optimization' including the philosophy, general approach, and results obtained in the U. S. industry. The significant safety improvements afforded by properly implementing outage improvement programs will be explained. Some specific examples of outage improvements will be given including the adoption of a strong Outage Preparation Milestone Program. The paper will then describe the attributes of an effective Outage Preparation Milestone Program and list a set of specific key milestones. The key milestones are defined and the reasons for each are explained. Suggested due dates for each key milestone relative to the outage start date are provided. Successful implementation of an Outage Preparation Milestone program depends heavily upon the management tools and methods used to assure that the organization meets the milestones on time and in a quality fashion. These include methods to handle cases where milestones are not met - either partially or fully. KHNP is investigating implementing an improved Outage Preparation Milestone program for its fleet of reactors as part of its overall program to improve its performance of planned outages

  7. Operational human performance reliability assessment (OHPRA)

    International Nuclear Information System (INIS)

    Haas, P.M.; Swanson, P.J.; Connelly, E.M.

    1993-01-01

    Operational Human Performance Reliability Assessment (OHPRA) is an approach for assessing human performance that is being developed in response to demands from modern process industries for practical and effective tools to assess and improve human performance, and therefore overall system performance and safety. The single most distinguishing feature of the approach is that is defines human performance in open-quotes operationalclose quotes terms. OHPRA is focused not on generation of human error probabilities, but on practical analysis of human performance to aid management in (1) identifying open-quotes fixableclose quotes problems and (2) providing input on the importance and nature of potential improvements. Development of the model in progress uses a unique approach for eliciting expert strategies for assessing performance. A PC-based model incorporating this expertise is planned. A preliminary version of the approach has already been used successfully to identify practical human performance problems in reactor and chemical process plant operations

  8. Development of a reliable estimation procedure of radioactivity inventory in a BWR plant due to neutron irradiation for decommissioning

    Directory of Open Access Journals (Sweden)

    Tanaka Ken-ichi

    2017-01-01

    Full Text Available Reliable information of radioactivity inventory resulted from the radiological characterization is important in order to plan decommissioning planning and is also crucial in order to promote decommissioning in effectiveness and in safe. The information is referred to by planning of decommissioning strategy and by an application to regulator. Reliable information of radioactivity inventory can be used to optimize the decommissioning processes. In order to perform the radiological characterization reliably, we improved a procedure of an evaluation of neutron-activated materials for a Boiling Water Reactor (BWR. Neutron-activated materials are calculated with calculation codes and their validity should be verified with measurements. The evaluation of neutron-activated materials can be divided into two processes. One is a distribution calculation of neutron-flux. Another is an activation calculation of materials. The distribution calculation of neutron-flux is performed with neutron transport calculation codes with appropriate cross section library to simulate neutron transport phenomena well. Using the distribution of neutron-flux, we perform distribution calculations of radioactivity concentration. We also estimate a time dependent distribution of radioactivity classification and a radioactive-waste classification. The information obtained from the evaluation is utilized by other tasks in the preparatory tasks to make the decommissioning plan and the activity safe and rational.

  9. Development of a reliable estimation procedure of radioactivity inventory in a BWR plant due to neutron irradiation for decommissioning

    Science.gov (United States)

    Tanaka, Ken-ichi; Ueno, Jun

    2017-09-01

    Reliable information of radioactivity inventory resulted from the radiological characterization is important in order to plan decommissioning planning and is also crucial in order to promote decommissioning in effectiveness and in safe. The information is referred to by planning of decommissioning strategy and by an application to regulator. Reliable information of radioactivity inventory can be used to optimize the decommissioning processes. In order to perform the radiological characterization reliably, we improved a procedure of an evaluation of neutron-activated materials for a Boiling Water Reactor (BWR). Neutron-activated materials are calculated with calculation codes and their validity should be verified with measurements. The evaluation of neutron-activated materials can be divided into two processes. One is a distribution calculation of neutron-flux. Another is an activation calculation of materials. The distribution calculation of neutron-flux is performed with neutron transport calculation codes with appropriate cross section library to simulate neutron transport phenomena well. Using the distribution of neutron-flux, we perform distribution calculations of radioactivity concentration. We also estimate a time dependent distribution of radioactivity classification and a radioactive-waste classification. The information obtained from the evaluation is utilized by other tasks in the preparatory tasks to make the decommissioning plan and the activity safe and rational.

  10. Reliability modeling and analysis of smart power systems

    CERN Document Server

    Karki, Rajesh; Verma, Ajit Kumar

    2014-01-01

    The volume presents the research work in understanding, modeling and quantifying the risks associated with different ways of implementing smart grid technology in power systems in order to plan and operate a modern power system with an acceptable level of reliability. Power systems throughout the world are undergoing significant changes creating new challenges to system planning and operation in order to provide reliable and efficient use of electrical energy. The appropriate use of smart grid technology is an important drive in mitigating these problems and requires considerable research acti

  11. 75 FR 66038 - Planning Resource Adequacy Assessment Reliability Standard

    Science.gov (United States)

    2010-10-27

    ..., providing a common framework for resource adequacy analysis, assessment, and documentation) effectively and...://www.nerc.com/commondocs.php?cd=2 . D. Proposed Effective Date 24. Proposed regional Reliability...

  12. Improvement in QA protocol for TLD based personnel monitoring laboratory in last five year

    International Nuclear Information System (INIS)

    Rakesh, R.B.

    2018-01-01

    The Quality Assurance (QA) in Personnel monitoring (PM) is a tool to assess the performance of PM laboratories and reliability of dose estimation with respect to standards laid down by international agencies such as IAEA (ISO trumpet curve), IEC, ANSI etc. Reliable personal dose estimation is a basic requirement for radiation protection planning as well as decision making continuous improvement in radiation protection is inherent in radiation protection practices which is highly dependent on accuracy and reliability of the monitoring data. Experience based evolution of Quality control (QC) measures as well as Quality assurance (QA) protocol are two important aspects towards continuous improvement in accuracy and reliability of personnel monitoring results. The paper describes improvement in QC measures and QA protocols initiated during the last five years which led to improvement in the quality of PM services

  13. Study on the Management for the Nuclear Power Plant Maintenance and Equipment Reliability

    International Nuclear Information System (INIS)

    Yoon, Kyeongseop; Lee, Sangheon; Kim, Myungjin; Lee, Unjang

    2015-01-01

    In our country, many studies on the regulatory policy of the plant maintenance have ever been performed since 1998, but the relevant regulatory requirements were not established yet. These background mentioned above request us to study on the regulation policy and maintenance plan to improve the safety, reliability and efficiency of NPP. To solve these problems, in this study, we deduct the management methodology for the improvement of NPP maintenance and equipment reliability that is essential to secure the safety and efficiency of the commercial NPP. For analysis the maintenance and equipment reliability management methodology in overseas NPP. We studied maintenance and equipment reliability of USA, Canada and Europe(France, England, German). We also studied status and application condition of Korean NPP maintenance management technical development. We deducted an effective maintenance methodology that is needed to Korean NPP, as a result of comparison on the technical trend of the maintenance management between overseas and Korean, such like following. - Regulation form ·Specific provision of regulation requirement and application of form that is clarifying application standard - Maintenance management methodology, Maintenance management program. This results of study could be applied for regulation policy, law and guideline establishment of NPP maintenance, operation, supervision and a system establishment for maintenance management, education data about maintenance for NPP employees

  14. Reliability calculations

    International Nuclear Information System (INIS)

    Petersen, K.E.

    1986-03-01

    Risk and reliability analysis is increasingly being used in evaluations of plant safety and plant reliability. The analysis can be performed either during the design process or during the operation time, with the purpose to improve the safety or the reliability. Due to plant complexity and safety and availability requirements, sophisticated tools, which are flexible and efficient, are needed. Such tools have been developed in the last 20 years and they have to be continuously refined to meet the growing requirements. Two different areas of application were analysed. In structural reliability probabilistic approaches have been introduced in some cases for the calculation of the reliability of structures or components. A new computer program has been developed based upon numerical integration in several variables. In systems reliability Monte Carlo simulation programs are used especially in analysis of very complex systems. In order to increase the applicability of the programs variance reduction techniques can be applied to speed up the calculation process. Variance reduction techniques have been studied and procedures for implementation of importance sampling are suggested. (author)

  15. Application for Planning and Improvement of Public Water Supply in ...

    African Journals Online (AJOL)

    ADOWIE PERE

    The study applied the tool of GIS in the planning and improvement of water ... proffer an acceptable solution to the problems of water supply in the study area. Primary data generated ..... Tropical Hydrology and Water. Resources. Iloeje, N.P. ...

  16. North American Electric Reliability Council (NERC) Reliability Coordinators

    Data.gov (United States)

    Department of Homeland Security — ERC is an international regulatory authority that works to improve the reliability of the bulk power system in North America. NERC works with many different regional...

  17. Video training and certification program improves reliability of postischemic neurologic deficit measurement in the rat.

    Science.gov (United States)

    Taninishi, Hideki; Pearlstein, Molly; Sheng, Huaxin; Izutsu, Miwa; Chaparro, Rafael E; Goldstein, Larry B; Warner, David S

    2016-12-01

    Scoring systems are used to measure behavioral deficits in stroke research. Video-assisted training is used to standardize stroke-related neurologic deficit scoring in humans. We hypothesized that a video-assisted training and certification program can improve inter-rater reliability in assessing neurologic function after middle cerebral artery occlusion in rats. Three expert raters scored neurologic deficits in post-middle cerebral artery occlusion rats using three published systems having different complexity levels (3, 18, or 48 points). The system having the highest point estimate for the correlation between neurologic score and infarct size was selected to create a video-assisted training and certification program. Eight trainee raters completed the video-assisted training and certification program. Inter-rater agreement ( Κ: score) and agreement with expert consensus scores were measured before and after video-assisted training and certification program completion. The 48-point system correlated best with infarct size. Video-assisted training and certification improved agreement with expert consensus scores (pretraining = 65 ± 10, posttraining = 87 ± 14, 112 possible scores, P  0.4 (pretraining = 4, posttraining = 9), and number of categories with an improvement in the Κ: score from pretraining to posttraining (n = 6). Video-assisted training and certification improved trainee inter-rater reliability and agreement with expert consensus behavioral scores in rats after middle cerebral artery occlusion. Video-assisted training and certification may be useful in multilaboratory preclinical studies. © The Author(s) 2015.

  18. Improved ant Colony Optimization for Virtual Teams Building in Collaborative Process Planning

    Directory of Open Access Journals (Sweden)

    Yingying Su

    2014-02-01

    Full Text Available Virtual teams have been adopted by organizations to gain competitive advantages in this global economy. Virtual teams are a ubiquitous part of getting work done in almost every organization. For the purpose of building virtual teams in collaborative process planning, the method based on improved ant colony algorithm (IMACO was proposed. The concept of virtual team was illustrated and the necessity of building virtual teams in collaborative process planning was analyzed. The sub tasks with certain timing relationship were described and the model of building virtual teams in collaborative process planning was established, which was solved by improved ant colony algorithm. In this paper applications of the IMACO and ACO are compared and demonstrate that the use of the IMACO algorithm performs better. An example was studied to illustrate the effectiveness of the strategy.

  19. Mining protein interactomes to improve their reliability and support the advancement of network medicine

    KAUST Repository

    Alanis Lobato, Gregorio

    2015-09-23

    High-throughput detection of protein interactions has had a major impact in our understanding of the intricate molecular machinery underlying the living cell, and has permitted the construction of very large protein interactomes. The protein networks that are currently available are incomplete and a significant percentage of their interactions are false positives. Fortunately, the structural properties observed in good quality social or technological networks are also present in biological systems. This has encouraged the development of tools, to improve the reliability of protein networks and predict new interactions based merely on the topological characteristics of their components. Since diseases are rarely caused by the malfunction of a single protein, having a more complete and reliable interactome is crucial in order to identify groups of inter-related proteins involved in disease etiology. These system components can then be targeted with minimal collateral damage. In this article, an important number of network mining tools is reviewed, together with resources from which reliable protein interactomes can be constructed. In addition to the review, a few representative examples of how molecular and clinical data can be integrated to deepen our understanding of pathogenesis are discussed.

  20. Mining protein interactomes to improve their reliability and support the advancement of network medicine

    Directory of Open Access Journals (Sweden)

    Gregorio eAlanis-Lobato

    2015-09-01

    Full Text Available High-throughput detection of protein interactions has had a major impact in our understanding of the intricate molecular machinery underlying the living cell, and has permitted the construction of very large protein interactomes. The protein networks that are currently available are incomplete and a significant percentage of their interactions are false positives. Fortunately, the structural properties observed in good quality social or technological networks are also present in biological systems. This has encouraged the development of tools, to improve the reliability of protein networks and predict new interactions based merely on the topological characteristics of their components. Since diseases are rarely caused by the malfunction of a single protein, having a more complete and reliable interactome is crucial in order to identify groups of inter-related proteins involved in disease aetiology. These system components can then be targeted with minimal collateral damage. In this article, an important number of network mining tools is reviewed, together with resources from which reliable protein interactomes can be constructed. In addition to the review, a few representative examples of how molecular and clinical data can be integrated to deepen our understanding of pathogenesis are discussed.

  1. Strategic plan: A tool to improve IPP project earnings

    International Nuclear Information System (INIS)

    LeClerc, S.

    1997-01-01

    This paper presents a strategic plan to analyze and convert project operations to gain short-term and long-term economic benefits. Areas of Opportunity were identified which may result in improved project economics from Independent Power Producers' project reviews. This paper discusses each Area of Opportunity, suggests options for investigation, and provides a potential magnitude of upside for solid fuel circulating fluidized bed projects in the 50 MW project size. The Areas of Opportunity are: (1) Power Purchase Agreement Modifications; (2) Fuel Use Optimization; (3) Power Plant Upgrades; (4) Power Plant Depreciation Schedule And FAS 121 Analysis; (5) Operation ampersand Maintenance Review; (6) Financial Contract Review; (7) Environmental Review; (8) Insurance Coverage Review; (9) Internal Management Review; and (10) Strategic Development For Energy Sales. Ten appendices are included which comprise a sample Strategic Plan: (1) Potential Plant Upgrades, (2) Enhancement Criteria, (3) Age of Coal Burning Plants, (4) Btu Energy Price Summary, (5) Typical Operation and Maintenance Audit Findings, (6) Typical Performance Objectives and Guidelines, (7) Typical Heavy Metal Emissions, (8) Typical Strategic Plan Formulation, (9) Strategic Plan Implementation Schedule, and (10) Typical Decision Tree. 8 refs

  2. Progress in improving provincial plans for nutrition through targeted technical assistance and local advocacy in Vietnam.

    Science.gov (United States)

    Harris, Jody; Nguyen, Phuong H; To, Quyen; Frongillo, Edward A; Menon, Purnima

    2016-12-01

    Vietnam has been decentralizing nutrition planning to provinces, which could help with local relevance and accountability. Assessment in 2009 found a continuing top-down approach, limited human capacity, and difficulty in integrating multiple sectors. Alive and Thrive (A&T) provided targeted assistance and capacity-building for 15 provincial plans for nutrition (PPNs). We aimed to (i) assess PPN content and quality improvements 2009-2014, and (ii) explain processes through which change occurred. Data consisted of interview-based assessments of provincial planning processes, annual PPN assessments, and tracking of A&T involvement. At endline, some provinces produced higher quality plans. Local planning skills improved, but capacity remained insufficient. Awareness of and support for nutrition improved, but some policy and legal environments were contradictory. Objectives were clearer, but use of data for planning remained inconsistent. Provinces became more proactive and creative, but remained constrained by slow approval processes and insufficient funding. Targeted assistance and local advocacy can improve decentralized planning, with success dependent on policy and programming contexts and ability to overcome constraints around capacity, investment, data use and remnants of centralized planning. We recommend strong engagement with planners at the national level to understand how to unblock major constraints; solutions must take into consideration the particular political, financial and administrative context. © The Author 2016. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine.

  3. An Improved Harmony Search Algorithm for Power Distribution Network Planning

    Directory of Open Access Journals (Sweden)

    Wei Sun

    2015-01-01

    Full Text Available Distribution network planning because of involving many variables and constraints is a multiobjective, discrete, nonlinear, and large-scale optimization problem. Harmony search (HS algorithm is a metaheuristic algorithm inspired by the improvisation process of music players. HS algorithm has several impressive advantages, such as easy implementation, less adjustable parameters, and quick convergence. But HS algorithm still has some defects such as premature convergence and slow convergence speed. According to the defects of the standard algorithm and characteristics of distribution network planning, an improved harmony search (IHS algorithm is proposed in this paper. We set up a mathematical model of distribution network structure planning, whose optimal objective function is to get the minimum annual cost and constraint conditions are overload and radial network. IHS algorithm is applied to solve the complex optimization mathematical model. The empirical results strongly indicate that IHS algorithm can effectively provide better results for solving the distribution network planning problem compared to other optimization algorithms.

  4. Improving the reliability of GUB-20000 gamma unit for large laboratory animals irradiation

    International Nuclear Information System (INIS)

    Videnskij, V.G.

    1994-01-01

    GUB-20000 gamma unit for large laboratory animals irradiation is described and results of investigation into its reliability improvement are considered. Cables of superstrength high-modular (SSHM) polymer fibre and capron fiber were tested to establish their applicability in the above unit. Samples were exposed to gamma-radiation and fast electrons and were tested for tensile properties. Application of SSHM-fiber cables to modernize the GUB-20000 unit was found to be perspective due to superhigh radiation strength. 5 refs., 1 tab

  5. Uncertainties in model-based outcome predictions for treatment planning

    International Nuclear Information System (INIS)

    Deasy, Joseph O.; Chao, K.S. Clifford; Markman, Jerry

    2001-01-01

    Purpose: Model-based treatment-plan-specific outcome predictions (such as normal tissue complication probability [NTCP] or the relative reduction in salivary function) are typically presented without reference to underlying uncertainties. We provide a method to assess the reliability of treatment-plan-specific dose-volume outcome model predictions. Methods and Materials: A practical method is proposed for evaluating model prediction based on the original input data together with bootstrap-based estimates of parameter uncertainties. The general framework is applicable to continuous variable predictions (e.g., prediction of long-term salivary function) and dichotomous variable predictions (e.g., tumor control probability [TCP] or NTCP). Using bootstrap resampling, a histogram of the likelihood of alternative parameter values is generated. For a given patient and treatment plan we generate a histogram of alternative model results by computing the model predicted outcome for each parameter set in the bootstrap list. Residual uncertainty ('noise') is accounted for by adding a random component to the computed outcome values. The residual noise distribution is estimated from the original fit between model predictions and patient data. Results: The method is demonstrated using a continuous-endpoint model to predict long-term salivary function for head-and-neck cancer patients. Histograms represent the probabilities for the level of posttreatment salivary function based on the input clinical data, the salivary function model, and the three-dimensional dose distribution. For some patients there is significant uncertainty in the prediction of xerostomia, whereas for other patients the predictions are expected to be more reliable. In contrast, TCP and NTCP endpoints are dichotomous, and parameter uncertainties should be folded directly into the estimated probabilities, thereby improving the accuracy of the estimates. Using bootstrap parameter estimates, competing treatment

  6. 76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans

    Science.gov (United States)

    2011-09-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act; Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and subsequent...

  7. Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction

    Science.gov (United States)

    Trusaji, Wildan; Akbar, Muhammad; Sukoyo; Irianto, Dradjad

    2018-03-01

    In making bearing procurement analysis, price and its reliability must be considered as decision criteria, since price determines the direct cost as acquisition cost and reliability of bearing determine the indirect cost such as maintenance cost. Despite the indirect cost is hard to identify and measured, it has high contribution to overall cost that will be incurred. So, the indirect cost of reliability must be considered when making bearing procurement analysis. This paper tries to explain bearing evaluation method with the total cost of ownership analysis to consider price and maintenance cost as decision criteria. Furthermore, since there is a lack of failure data when bearing evaluation phase is conducted, reliability prediction method is used to predict bearing reliability from its dynamic load rating parameter. With this method, bearing with a higher price but has higher reliability is preferable for long-term planning. But for short-term planning the cheaper one but has lower reliability is preferable. This contextuality can give rise to conflict between stakeholders. Thus, the planning horizon needs to be agreed by all stakeholder before making a procurement decision.

  8. Improved plan quality with automated radiotherapy planning for whole brain with hippocampus sparing: a comparison to the RTOG 0933 trial.

    Science.gov (United States)

    Krayenbuehl, J; Di Martino, M; Guckenberger, M; Andratschke, N

    2017-10-02

    Whole-brain radiation therapy (WBRT) with hippocampus sparing (HS) has been investigated by the radiation oncology working group (RTOG) 0933 trial for patients with multiple brain metastases. They showed a decrease of adverse neurocognitive effects with HS WBRT compared to WBRT alone. With the development of automated treatment planning system (aTPS) in the last years, a standardization of the plan quality at a high level was achieved. The goal of this study was to evaluate the feasibility of using an aTPS for the treatment of HS WBRT and see if the RTOG 0933 dose constraints could be achieved and improved. Ten consecutive patients treated with HS WBRT were enrolled in this study. 10 × 3 Gy was prescribed according to the RTOG 0933 protocol to 92% of the target volume (whole-brain excluding the hippocampus expanded by 5 mm in 3-dimensions). In contrast to RTOG 0933, the maximum allowed point dose to normal brain was significantly lowered and restricted to 36.5 Gy. All patients were planned with volumetric modulated arc therapy (VMAT) technique using four arcs. Plans were optimized using Auto-Planning (AP) (Philips Radiation Oncology Systems) with one single AP template and optimization. All the constraints from the RTOG 0933 trial were achieved. A significant improvement for the maximal dose to 2% of the brain with a reduction of 4 Gy was achieved (33.5 Gy vs. RTOG 37.5 Gy) and the minimum hippocampus dose was reduced by 10% (8.1 Gy vs. RTOG 9 Gy). A steep dose gradient around the hippocampus was achieved with a mean dose of 27.3 Gy at a distance between 0.5 cm and 1 cm from the hippocampus. The effective working time to optimize a plan was kept below 6'. Automated treatment planning for HS WBRT was able to fulfil all the recommendations from the RTOG 0933 study while significantly improving dose homogeneity and decreasing unnecessary hot spot in the normal brain. With this approach, a standardization of plan quality was achieved and the effective

  9. Planning of distributed generation in distribution network based on improved particle swarm optimization algorithm

    Science.gov (United States)

    Li, Jinze; Qu, Zhi; He, Xiaoyang; Jin, Xiaoming; Li, Tie; Wang, Mingkai; Han, Qiu; Gao, Ziji; Jiang, Feng

    2018-02-01

    Large-scale access of distributed power can improve the current environmental pressure, at the same time, increasing the complexity and uncertainty of overall distribution system. Rational planning of distributed power can effectively improve the system voltage level. To this point, the specific impact on distribution network power quality caused by the access of typical distributed power was analyzed and from the point of improving the learning factor and the inertia weight, an improved particle swarm optimization algorithm (IPSO) was proposed which could solve distributed generation planning for distribution network to improve the local and global search performance of the algorithm. Results show that the proposed method can well reduce the system network loss and improve the economic performance of system operation with distributed generation.

  10. Participatory System Dynamics Modeling: Increasing Stakeholder Engagement and Precision to Improve Implementation Planning in Systems.

    Science.gov (United States)

    Zimmerman, Lindsey; Lounsbury, David W; Rosen, Craig S; Kimerling, Rachel; Trafton, Jodie A; Lindley, Steven E

    2016-11-01

    Implementation planning typically incorporates stakeholder input. Quality improvement efforts provide data-based feedback regarding progress. Participatory system dynamics modeling (PSD) triangulates stakeholder expertise, data and simulation of implementation plans prior to attempting change. Frontline staff in one VA outpatient mental health system used PSD to examine policy and procedural "mechanisms" they believe underlie local capacity to implement evidence-based psychotherapies (EBPs) for PTSD and depression. We piloted the PSD process, simulating implementation plans to improve EBP reach. Findings indicate PSD is a feasible, useful strategy for building stakeholder consensus, and may save time and effort as compared to trial-and-error EBP implementation planning.

  11. Improving the Simplified Acquisition of Base Engineering Requirements (SABER) Delivery Order Award Process: Results of a Process Improvement Plan

    Science.gov (United States)

    1991-09-01

    putting all tasks directed towsrds achieving an outcome in aequence. The tasks can be viewed as steps in the process (39:2.3). Using this...improvement opportunity is investigated. A plan is developed, root causes are identified, and solutions are tested and implemented. The process is... solutions , check for actual improvement, and integrate the successful improvements into the process. ?UP 7. Check Improvement Performance. Finally, the

  12. Summary of strategies for planning Productivity Improvement and Quality Enhancement (PIQE)

    Science.gov (United States)

    1986-01-01

    The Summary of NASA Strategies for Productivity Improvement and Quality Enhancement respond to NASA's eighth top goal: Establish NASA as a leader in the development and application of advanced technology and management practices which contribute to significant increases in both Agency and national productivity. The Strategies provide the framework for development of the agency-wide Productivity Improvement and Quality Enhancement (PIQE) Plans.

  13. Photovoltaic power system reliability considerations

    Science.gov (United States)

    Lalli, V. R.

    1980-01-01

    This paper describes an example of how modern engineering and safety techniques can be used to assure the reliable and safe operation of photovoltaic power systems. This particular application was for a solar cell power system demonstration project in Tangaye, Upper Volta, Africa. The techniques involve a definition of the power system natural and operating environment, use of design criteria and analysis techniques, an awareness of potential problems via the inherent reliability and FMEA methods, and use of a fail-safe and planned spare parts engineering philosophy.

  14. State landscape in public health planning and quality improvement: results of the ASTHO survey.

    Science.gov (United States)

    Madamala, Kusuma; Sellers, Katie; Pearsol, Jim; Dickey, Michael; Jarris, Paul E

    2010-01-01

    Limited data exist on state public health agencies and their use of planning and quality improvement (QI) initiatives. Using the 2007 Association of State and Territorial Health Officials (ASTHO) State Public Health Survey, this article describes how state public health agencies perform tasks related to planning, performance management (PM), and QI. While 82 percent of respondents report having a QI process in place, only 9.8 percent have it fully implemented departmentwide. Seventy-six percent reported having a PM process in place, with 16 percent (n = 8) having it fully implemented departmentwide. A state health improvement plan was used by 80.4 percent of respondents, with 56.9 percent of respondents completing the plan more than 3 years ago. More than two-thirds (68.2%) of the respondents developed the plan by using results of their state health assessment. Analysis of state health department level planning, PM, and QI initiatives can inform states' efforts to ready themselves to meet the proposed national voluntary accreditation standards of the Public Health Accreditation Board.

  15. Equipment reliability process improvement and preventive maintenance optimization

    International Nuclear Information System (INIS)

    Darragi, M.; Georges, A.; Vaillancourt, R.; Komljenovic, D.; Croteau, M.

    2004-01-01

    The Gentilly-2 Nuclear Power Plant wants to optimize its preventive maintenance program through an Integrated Equipment Reliability Process. All equipment reliability related activities should be reviewed and optimized in a systematic approach especially for aging plants such as G2. This new approach has to be founded on best practices methods with the purpose of the rationalization of the preventive maintenance program and the performance monitoring of on-site systems, structures and components (SSC). A rational preventive maintenance strategy is based on optimized task scopes and frequencies depending on their applicability, critical effects on system safety and plant availability as well as cost-effectiveness. Preventive maintenance strategy efficiency is systematically monitored through degradation indicators. (author)

  16. Change in challenging times: a plan for extending and improving health coverage.

    Science.gov (United States)

    Lambrew, Jeanne M; Podesta, John D; Shaw, Teresa L

    2005-01-01

    Some speculate that Americans are neither politically capable of nor morally committed to solving the health system problems. We disagree. We propose a plan that insures all and improves the value and cost-effectiveness of health care by knitting together employer-sponsored insurance and Medicaid; promoting prevention, research, and information technology; and financing its investments through a dedicated value-added tax. By prioritizing practicality, fairness, and responsibility, the plan aims to avoid ideological battles and prevent fear of major change. By emphasizing the moral imperative for change, especially relative to other options on the policy agenda, it aims to create momentum for expanding and improving health coverage for all.

  17. Development and Reliability of the Comprehensive Crisis Plan Checklist

    Science.gov (United States)

    Aspiranti, Kathleen B.; Pelchar, Taylor K.; McCLeary, Daniel F.; Bain, Sherry K.; Foster, Lisa N.

    2011-01-01

    It is of vital importance that children are educated in a safe environment. Every school needs to have a well-developed crisis management document containing plans for prevention, intervention, and postvention. We developed the Comprehensive Crisis Plan Checklist (CCPC) to serve as a valuable tool that can be used to assist practitioners with…

  18. Sign up to Safety: developing a safety improvement plan.

    Science.gov (United States)

    Dight, Carol; Peters, Hayley

    2015-04-01

    The Sign up to Safety (SutS) programme was launched in June 2014 by health secretary Jeremy Hunt. It focuses on listening to patients, carers and staff, learning from what they say when things go wrong, and then taking action to improve patient safety. The programme aims to make the NHS the safest healthcare system in the world by creating a culture devoted to continuous learning and improvement (NHS England 2014). Musgrove Park Hospital, part of Taunton and Somerset NHS Foundation Trust, was one of 12 NHS organisations that signed up to the SutS programme, making public its commitment to the national pledges to be 'open and transparent' and to develop a safety improvement plan. This paper describes the development of the strategy.

  19. Reducing DNACPR complaints to zero: designing and implementing a treatment escalation plan using quality improvement methodology.

    Science.gov (United States)

    Shermon, Elizabeth; Munglani, Laura; Oram, Sarah; William, Linda; Abel, Julian

    2017-01-01

    Do Not Attempt Resuscitation (DNAR)decisions have traditionally formed the basis of ceiling of care discussions. However, poor quality discussions can lead to high patient and relative dissatisfaction, generating hospital complaints. Treatment escalation plans (TEPs) aim to highlight the wider remit of treatment options with a focus on effective communication. We aimed to improve TEP discussions and documentation at Weston General Hospital by introducing a standardised form. We aimed to develop a TEP document to reduce resuscitation-related complaints by improving communication and documentation. Qualitative and quantitative data were collected over 2 years and used to develop plan-do-study-act (PDSA) cycles using quality improvement methodology. Main barriers to improvement included time constraints and clinician's resistance. Analysis of patient liaison services data showed a progressive reduction in complaints regarding resuscitation, with no complaints having been received for the final six months of the project. Through use of a standardised form including treatment prompts, the quality of discussions and plans improved. Qualitative feedback demonstrated increased patient and relative satisfaction. In addition, junior doctors report the plans are helpful when making out-of-hours decisions. Development of a user-friendly form to document patient-guided TEPs helped junior doctors to lead advanced care planning discussions. The use of PDSA cycles demonstrated improvement in the quality of forms, which in turn improved communication, documentation and satisfaction. Future developments could include involvement of specialist teams to ensure TEP forms remain relevant to all clinical areas. In addition, with widespread use of the TEP forms, the traditional tick-box DNAR could be replaced to focus on patient-led care planning.

  20. Novel approach for evaluation of service reliability for electricity customers

    Institute of Scientific and Technical Information of China (English)

    JIANG; John; N

    2009-01-01

    Understanding reliability value for electricity customer is important to market-based reliability management. This paper proposes a novel approach to evaluate the reliability for electricity customers by using indifference curve between economic compensation for power interruption and service reliability of electricity. Indifference curve is formed by calculating different planning schemes of network expansion for different reliability requirements of customers, which reveals the information about economic values for different reliability levels for electricity customers, so that the reliability based on market supply demand mechanism can be established and economic signals can be provided for reliability management and enhancement.

  1. Coupling the Biophysical and Social Dimensions of Wildfire Risk to Improve Wildfire Mitigation Planning.

    Science.gov (United States)

    Ager, Alan A; Kline, Jeffrey D; Fischer, A Paige

    2015-08-01

    We describe recent advances in biophysical and social aspects of risk and their potential combined contribution to improve mitigation planning on fire-prone landscapes. The methods and tools provide an improved method for defining the spatial extent of wildfire risk to communities compared to current planning processes. They also propose an expanded role for social science to improve understanding of community-wide risk perceptions and to predict property owners' capacities and willingness to mitigate risk by treating hazardous fuels and reducing the susceptibility of dwellings. In particular, we identify spatial scale mismatches in wildfire mitigation planning and their potential adverse impact on risk mitigation goals. Studies in other fire-prone regions suggest that these scale mismatches are widespread and contribute to continued wildfire dwelling losses. We discuss how risk perceptions and behavior contribute to scale mismatches and how they can be minimized through integrated analyses of landscape wildfire transmission and social factors that describe the potential for collaboration among landowners and land management agencies. These concepts are then used to outline an integrated socioecological planning framework to identify optimal strategies for local community risk mitigation and improve landscape-scale prioritization of fuel management investments by government entities. © 2015 Society for Risk Analysis.

  2. Space transportation main engine reliability and safety

    Science.gov (United States)

    Monk, Jan C.

    1991-01-01

    Viewgraphs are used to illustrate the reliability engineering and aerospace safety of the Space Transportation Main Engine (STME). A technology developed is called Total Quality Management (TQM). The goal is to develop a robust design. Reducing process variability produces a product with improved reliability and safety. Some engine system design characteristics are identified which improves reliability.

  3. Improving Family Meetings in Intensive Care Units: A Quality Improvement Curriculum.

    Science.gov (United States)

    Gruenewald, David A; Gabriel, Michelle; Rizzo, Dorothy; Luhrs, Carol A

    2017-07-01

    Family meetings in the intensive care unit are associated with beneficial outcomes for patients, their families, and health care systems, yet these meetings often do not occur in a timely, effective, reliable way. The Department of Veterans Affairs Comprehensive End-of-Life Care Implementation Center sponsored a national initiative to improve family meetings in Veterans Affairs intensive care units across the United States. Process measures of success for the initiative were identified, including development of a curriculum to support facility-based quality improvement projects to implement high-quality family meetings. Identified curriculum requirements included suitability for distance learning and applicability to many clinical intensive care units. Curriculum modules were cross-mapped to the "Plan-Do-Study-Act" model to aid in planning quality improvement projects. A questionnaire was e-mailed to users to evaluate the curriculum's effectiveness. Users rated the curriculum's effectiveness in supporting and achieving aims of the initiative as 3.6 on a scale of 0 (not effective) to 4 (very effective). Users adapted the curriculum to meet local needs. The number of users increased from 6 to 17 quality improvement teams in 2 years. All but 3 teams progressed to implementation of an action plan. Users were satisfied with the effectiveness and adaptability of a family-meeting quality improvement curriculum to support implementation of a quality improvement project in Veterans Affairs intensive care units. This tool may be useful in facilitating projects to improve the quality of family meetings in other intensive care units. ©2017 American Association of Critical-Care Nurses.

  4. An integrated approach to hospital strategic planning, quality assurance, and continuous quality improvement.

    Science.gov (United States)

    Day, G; Gardner, S; Herba, C

    1995-01-01

    Like many other healthcare organizations today, the authors' facility, a 306-bed acute care community hospital in Michigan, strives to visualize and make a transition from traditional quality assurance to continuous quality improvement. The Juran Trilogy provided the insight that strategic planning, measurement, and continuous improvement must exist side by side. At the authors' facility, this realization resulted in the hospital quality plan, which treats each of these components as part of the foundation for quality. The authors explain this model and the reporting and communication mechanisms that support it.

  5. Reliability database of IEA-R1 Brazilian research reactor: Applications to the improvement of installation safety

    International Nuclear Information System (INIS)

    Oliveira, P.S.P.; Tondin, J.B.M.; Martins, M.O.; Yovanovich, M.; Ricci Filho, W.

    2010-01-01

    In this paper the main features of the reliability database being developed at Ipen-Cnen/SP for IEA-R1 reactor are briefly described. Besides that, the process for collection and updating of data regarding operation, failure and maintenance of IEA-R1 reactor components is presented. These activities have been conducted by the reactor personnel under the supervision of specialists in Probabilistic Safety Analysis (PSA). The compilation of data and subsequent calculation are based on the procedures defined during an IAEA Coordinated Research Project which Brazil took part in the period from 2001 to 2004. In addition to component reliability data, the database stores data on accident initiating events and human errors. Furthermore, this work discusses the experience acquired through the development of the reliability database covering aspects like improvements in the reactor records as well as the application of the results to the optimization of operation and maintenance procedures and to the PSA carried out for IEA-R1 reactor. (author)

  6. An Improved Differential Evolution Algorithm for Maritime Collision Avoidance Route Planning

    Directory of Open Access Journals (Sweden)

    Yu-xin Zhao

    2014-01-01

    Full Text Available High accuracy navigation and surveillance systems are pivotal to ensure efficient ship route planning and marine safety. Based on existing ship navigation and maritime collision prevention rules, an improved approach for collision avoidance route planning using a differential evolution algorithm was developed. Simulation results show that the algorithm is capable of significantly enhancing the optimized route over current methods. It has the potential to be used as a tool to generate optimal vessel routing in the presence of conflicts.

  7. Lecture 8: Data Reliability at CERN and Ideas on How to Improve it

    CERN Multimedia

    CERN. Geneva

    2013-01-01

    The talk will give an overview of data management activities at CERN focusing on the ongoing research activities aiming to improve data and service reliability. Alberto Pace is a member if the IT department at CERN where he leads the Data and Storage services group ensuring a coherent development process for Physics Data management activities, strongly driven by operational and user needs. He has more than 25 years experience in computing services, infrastructure, software engineering, accelerator control and accelerator operation. He graduated in Electronic Engineering from Politecnico di Milano (Italy).

  8. Reliability improvement for anisotropic biased compensated α/β contamination meter

    Energy Technology Data Exchange (ETDEWEB)

    Coulon, R., E-mail: romain.coulon@cea.fr [CEA, LIST, Laboratoire Capteurs et Architectures Electroniques, F-91191 Gif-sur-Yvette (France); Montagu, T. [CEA, LIST, Laboratoire de Modélisation et Simulation des Systèmes, F-91191 Gif-sur-Yvette (France); Schoepff, V. [CEA, LIST, Laboratoire Capteurs et Architectures Electroniques, F-91191 Gif-sur-Yvette (France); Menaa, N.; Ulmann, A. Gallozzi; Blanc de Lanaute, N. [CANBERRA France, F-78182 St Quentin en Yvelines (France)

    2016-11-21

    Nuclear instruments such as alpha/beta contamination meter are frequently used in a compensated mode where the contribution of gamma radiation background is compensated by a guard detector. The signal of interest is then the subtraction of counting from both channels. In practice, the noise signal measured by the guard detector is not strictly equal to the noise contribution into the first detector due to anisotropic biases. The random error (under Poisson assumption) is taken into account to build a hypothesis test. The system is also designed to minimize the systematic error but in some cases, this bias could not be completely removed. The measurement system then shows different behavior when the surrounding environment changes exhibiting inopportune false alarms. A method allowing the false alarms to be suppressed is addressed in this study for compensated measurement. An improvement in terms of reliability has been proven.

  9. 76 FR 22295 - National Poultry Improvement Plan and Auxiliary Provisions

    Science.gov (United States)

    2011-04-21

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection 9 CFR Part 145 [Docket No. APHIS-2009-0031] RIN 0579-AD21 National Poultry Improvement Plan and Auxiliary Provisions Correction In rule document 2011-6539 appearing on pages 15791-15798 in the issue of Tuesday, March 22, 2011, make the...

  10. A review of manufacturing metrology for improved reliability of silicon photovoltaic modules

    Science.gov (United States)

    Davis, Kristopher O.; Walters, Joseph; Schneller, Eric; Seigneur, Hubert; Brooker, R. Paul; Scardera, Giuseppe; Rodgers, Marianne P.; Mohajeri, Nahid; Shiradkar, Narendra; Dhere, Neelkanth G.; Wohlgemuth, John; Rudack, Andrew C.; Schoenfeld, Winston V.

    2014-10-01

    In this work, the use of manufacturing metrology across the supply chain to improve crystalline silicon (c-Si) photovoltaic (PV) module reliability and durability is addressed. Additionally, an overview and summary of a recent extensive literature survey of relevant measurement techniques aimed at reducing or eliminating the probability of field failures is presented. An assessment of potential gaps is also given, wherein the PV community could benefit from new research and demonstration efforts. This review is divided into three primary areas representing different parts of the c-Si PV supply chain: (1) feedstock production, crystallization and wafering; (2) cell manufacturing; and (3) module manufacturing.

  11. Forecasting reliability of transformer populations

    NARCIS (Netherlands)

    Schijndel, van A.; Wetzer, J.; Wouters, P.A.A.F.

    2007-01-01

    The expected replacement wave in the current power grid faces asset managers with challenging questions. Setting up a replacement strategy and planning calls for a forecast of the long term component reliability. For transformers the future failure probability can be predicted based on the ongoing

  12. Reliability physics and engineering time-to-failure modeling

    CERN Document Server

    McPherson, J W

    2013-01-01

    Reliability Physics and Engineering provides critically important information that is needed for designing and building reliable cost-effective products. Key features include:  ·       Materials/Device Degradation ·       Degradation Kinetics ·       Time-To-Failure Modeling ·       Statistical Tools ·       Failure-Rate Modeling ·       Accelerated Testing ·       Ramp-To-Failure Testing ·       Important Failure Mechanisms for Integrated Circuits ·       Important Failure Mechanisms for  Mechanical Components ·       Conversion of Dynamic  Stresses into Static Equivalents ·       Small Design Changes Producing Major Reliability Improvements ·       Screening Methods ·       Heat Generation and Dissipation ·       Sampling Plans and Confidence Intervals This textbook includes numerous example problems with solutions. Also, exercise problems along with the answers are included at the end of each chapter. Relia...

  13. A Method for Improving Reliability of Radiation Detection using Deep Learning Framework

    International Nuclear Information System (INIS)

    Chang, Hojong; Kim, Tae-Ho; Han, Byunghun; Kim, Hyunduk; Kim, Ki-duk

    2017-01-01

    Radiation detection is essential technology for overall field of radiation and nuclear engineering. Previously, technology for radiation detection composes of preparation of the table of the input spectrum to output spectrum in advance, which requires simulation of numerous predicted output spectrum with simulation using parameters modeling the spectrum. In this paper, we propose new technique to improve the performance of radiation detector. The software in the radiation detector has been stagnant for a while with possible intrinsic error of simulation. In the proposed method, to predict the input source using output spectrum measured by radiation detector is performed using deep neural network. With highly complex model, we expect that the complex pattern between data and the label can be captured well. Furthermore, the radiation detector should be calibrated regularly and beforehand. We propose a method to calibrate radiation detector using GAN. We hope that the power of deep learning may also reach to radiation detectors and make huge improvement on the field. Using improved radiation detector, the reliability of detection would be confident, and there are many tasks remaining to solve using deep learning in nuclear engineering society.

  14. Self-guided training for deep brain stimulation planning using objective assessment.

    Science.gov (United States)

    Holden, Matthew S; Zhao, Yulong; Haegelen, Claire; Essert, Caroline; Fernandez-Vidal, Sara; Bardinet, Eric; Ungi, Tamas; Fichtinger, Gabor; Jannin, Pierre

    2018-04-04

    Deep brain stimulation (DBS) is an increasingly common treatment for neurodegenerative diseases. Neurosurgeons must have thorough procedural, anatomical, and functional knowledge to plan electrode trajectories and thus ensure treatment efficacy and patient safety. Developing this knowledge requires extensive training. We propose a training approach with objective assessment of neurosurgeon proficiency in DBS planning. To assess proficiency, we propose analyzing both the viability of the planned trajectory and the manner in which the operator arrived at the trajectory. To improve understanding, we suggest a self-guided training course for DBS planning using real-time feedback. To validate the proposed measures of proficiency and training course, two experts and six novices followed the training course, and we monitored their proficiency measures throughout. At baseline, experts planned higher quality trajectories and did so more efficiently. As novices progressed through the training course, their proficiency measures increased significantly, trending toward expert measures. We developed and validated measures which reliably discriminate proficiency levels. These measures are integrated into a training course, which quantitatively improves trainee performance. The proposed training course can be used to improve trainees' proficiency, and the quantitative measures allow trainees' progress to be monitored.

  15. Design reliability engineering

    International Nuclear Information System (INIS)

    Buden, D.; Hunt, R.N.M.

    1989-01-01

    Improved design techniques are needed to achieve high reliability at minimum cost. This is especially true of space systems where lifetimes of many years without maintenance are needed and severe mass limitations exist. Reliability must be designed into these systems from the start. Techniques are now being explored to structure a formal design process that will be more complete and less expensive. The intent is to integrate the best features of design, reliability analysis, and expert systems to design highly reliable systems to meet stressing needs. Taken into account are the large uncertainties that exist in materials, design models, and fabrication techniques. Expert systems are a convenient method to integrate into the design process a complete definition of all elements that should be considered and an opportunity to integrate the design process with reliability, safety, test engineering, maintenance and operator training. 1 fig

  16. Reliability Modeling of Wind Turbines

    DEFF Research Database (Denmark)

    Kostandyan, Erik

    Cost reductions for offshore wind turbines are a substantial requirement in order to make offshore wind energy more competitive compared to other energy supply methods. During the 20 – 25 years of wind turbines useful life, Operation & Maintenance costs are typically estimated to be a quarter...... for Operation & Maintenance planning. Concentrating efforts on development of such models, this research is focused on reliability modeling of Wind Turbine critical subsystems (especially the power converter system). For reliability assessment of these components, structural reliability methods are applied...... to one third of the total cost of energy. Reduction of Operation & Maintenance costs will result in significant cost savings and result in cheaper electricity production. Operation & Maintenance processes mainly involve actions related to replacements or repair. Identifying the right times when...

  17. Evolution of Machine Reliability and Life and Economics of Operational Use

    Directory of Open Access Journals (Sweden)

    Młynarski Stanisław

    2016-12-01

    Full Text Available The article presents new assumptions for reliability and life of machines, resulting from the development of technology. The innovative approach to reliability and life design as well as warranty duration planning is presented on an example of vehicle reliability characteristics. A new algorithm is proposed for the replacement of repairable objects costs by the price of life and reliability of new unrepairable ones. For the planning of the life of innovative machines, an effective method of technical progress rate determination is proposed. In conclusion, necessary modifications of machine and vehicle use systems, resulting from technology evolution and technical progress, are indicated. Finally, recommendations and directions of indispensable research in engineering and management of technical means of production are formulated.

  18. Proceedings of the CEATI 2010 distribution planning workshop

    International Nuclear Information System (INIS)

    2010-01-01

    This workshop provided a forum for electrical industry distribution experts to discuss methods of distribution planning that will ensure the provision of low-cost and reliable electrical service to present and future customers. Participants in the workshop discussed methods of integrating renewable energy resources, maximizing the use of existing assets, and reducing the carbon footprint of electric utilities. The effects of new loads on reliability, power quality, and voltage stability were considered. Planning distribution system modifications for the future were reviewed. The workshop provided an overview of distribution planning in relation to smart grids. The workshop included sessions on distribution planning for the 21. century; planning for a smarter grid; integrating renewable energy into the distribution system; and planning to manage reliability. The workshop featured 22 presentations, of which 16 have been catalogued separately for inclusion in this database. tabs., figs.

  19. Improving medication titration in heart failure by embedding a structured medication titration plan.

    Science.gov (United States)

    Hickey, Annabel; Suna, Jessica; Marquart, Louise; Denaro, Charles; Javorsky, George; Munns, Andrew; Mudge, Alison; Atherton, John J

    2016-12-01

    To improve up-titration of medications to target dose in heart failure patients by improving communication from hospital to primary care. This quality improvement project was undertaken within three heart failure disease management (HFDM) services in Queensland, Australia. A structured medication plan was collaboratively designed and implemented in an iterative manner, using methods including awareness raising and education, audit and feedback, integration into existing work practice, and incentive payments. Evaluation was undertaken using sequential audits, and included process measures (use of the titration plan, assignment of responsibility) and outcome measures (proportion of patients achieving target dose) in HFDM service patients with reduced left ventricular ejection fraction. Comparison of the three patient cohorts (pre-intervention cohort A n=96, intervention cohort B n=95, intervention cohort C n=89) showed increase use of the titration plan, a shift to greater primary care responsibility for titration, and an increase in the proportion of patients achieving target doses of angiotensin converting enzyme inhibitors/angiotensin receptor blockers (ACEI/ARB) (A 37% vs B 48% vs C 55%, p=0.051) and beta-blockers (A 38% vs B 33% vs C 51%, p=0.045). Combining all three cohorts, patients not on target doses when discharged from hospital were more likely to achieve target doses of ACEI/ARB (pplan. A medication titration plan was successfully implemented in three HFDM services and improved transitional communication and achievement of target doses of evidence-based therapies within six months of hospital discharge. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  20. Condition-based dynamic maintenance operations planning and grouping. Application to commercial heavy vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Bouvard, K., E-mail: keomany.bouvard@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France); Artus, S., E-mail: samuel.artus@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Berenguer, C., E-mail: christophe.berenguer@utt.f [Universite de technologie de Troyes - Institut Charles Delaunay and UMR CNRS 6279 - 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Cocquempot, V., E-mail: vincent.cocquempot@univ-lille1.f [Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France)

    2011-06-15

    This paper aims at presenting a method to optimize the maintenance planning for a commercial heavy vehicle. Such a vehicle may be considered as a multi-components system. Grouping maintenance operations related to each component reduces the global maintenance cost of the system. Classically, the optimization problem is solved using a priori reliability characteristics of components. Two types of methods may be used, i.e. static or dynamic methods. Static methods provide a fixed maintenance planning, whereas dynamic methods redefine the groups of maintenance operations at each decision time. Dynamic procedures can incorporate component information such as component states or detected failures. For deteriorating systems, reliability characteristics of each component may be estimated thanks to deterioration models and may be updated when a degradation measure is available. This additional information on degradation features allows to better follow the real state of each component and to improve the maintenance planning.

  1. Reliability Improved Design for a Safety System Channel

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Eung Se; Kim, Yun Goo [KHNP, Daejeon (Korea, Republic of)

    2016-05-15

    Nowadays, these systems are implemented with a same platform type, such as a qualified programmable logic controller (PLC). The platform intensively uses digital communication with fiber-optic links to reduce cabling costs and to achieve effective signal isolation. These communication interface and redundancies within a channel increase the complexness of an overall system design. This paper proposes a simpler channel architecture design to reduce the complexity and to enhance overall channel reliability. Simplified safety channel configuration is proposed and the failure probabilities are compared with baseline safety channel configuration using an estimated generic value. The simplified channel configuration achieves 40 percent failure reduction compare to baseline safety channel configuration. If this configuration can be implemented within a processor module, overall safety channel reliability is increase and costs of fabrication and maintenance will be greatly reduced.

  2. Reliability Improved Design for a Safety System Channel

    International Nuclear Information System (INIS)

    Oh, Eung Se; Kim, Yun Goo

    2016-01-01

    Nowadays, these systems are implemented with a same platform type, such as a qualified programmable logic controller (PLC). The platform intensively uses digital communication with fiber-optic links to reduce cabling costs and to achieve effective signal isolation. These communication interface and redundancies within a channel increase the complexness of an overall system design. This paper proposes a simpler channel architecture design to reduce the complexity and to enhance overall channel reliability. Simplified safety channel configuration is proposed and the failure probabilities are compared with baseline safety channel configuration using an estimated generic value. The simplified channel configuration achieves 40 percent failure reduction compare to baseline safety channel configuration. If this configuration can be implemented within a processor module, overall safety channel reliability is increase and costs of fabrication and maintenance will be greatly reduced

  3. Study on the improvement of nuclear fuel cladding reliability

    International Nuclear Information System (INIS)

    Rheem, Karp Soon; Han, Jung Ho; Jeong, Yong Hwan; Lee, Deok Hyun

    1987-12-01

    In order to improve the nuclear fuel cladding reliability for high burn-up fuels, the corrosion resistance of laser beam surface treated and β-quenched zircaloys and the mechanical characteristics including fatigue, burst, and out-of-pile PCMI characteristics of heat treated zircaloys were investigated. In addition, the inadiation characteristics of Ko-Ri reactor fuel claddings was examined. It was found that the wasteside corrosion resistance of commercial zircaloys was improved remarkably by laser beam surface treatment. The out-of-pile transient cladding failures were investigated in terms of hoop stress versus time-to-failures by means of mandrel loading units at 25 deg C and 325 deg C. Fatigue characteristics of the β-quenched and as-received zircaloy cladding were investigated by using an internal oil pressurization method which can simulate the load-following operation cycle. The results were in good agreement with the existing data obtained by conventional methods for commercial zircaloys. Burst tests were performed with commercial and the β-quenched zircaloys in high pressure argon gas atmosphere as a function of burst temperature. The burst stress decreased linearly in the α phase region up to 600 deg C and hereafter the decrement of the burst stress decreased gradually with temperature in the β-phase region. For the first time, the burst characteristic of the irradiated zircaloy-4 cladding tubes released from Ko-Ri nuclear power unit 1 was investigated, and attempts were made to trace the cause of cladding failures by examining the failed structure and fret marks by debris. (Author)

  4. 77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2012-06-05

    ... Project water conservation best management practices that shall ``develop criteria for evaluating the... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  5. 75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2010-11-16

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The...

  6. 76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2011-03-08

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  7. 77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2012-10-22

    ... Central Valley Project water conservation best management practices that shall ``develop criteria for... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  8. Aspects you should consider in your action plan when implementing an improvement strategy

    DEFF Research Database (Denmark)

    Carstensen, Peter; Vinter, Otto

    2017-01-01

    Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature that is the found......Both ISO/IEC 15504 (SPICE) and ISO/IEC 33014 include a step in their improvement process called: Develop action plan. But which actions should you include, and are you sure that these actions cover all aspects? We have performed a thorough study of the change strategy literature...

  9. An improved IEEE 802.11 protocol for reliable data transmission in power distribution fault diagnosis

    Energy Technology Data Exchange (ETDEWEB)

    Campoccia, F.; Di Silvestre, M.L.; Sanseverino, E.R.; Zizzo, G. [Palermo Univ., Palermo (Italy)

    2010-10-15

    In power systems, on-line transmission between local units and the central unit can be done by means of power line communications or wireless technology. During an electrical fault, the reliability of the distribution system depends on the security of the timely protective and restorative actions on the network. This paper focused on the WiFi system because of its economy and ease of installation. However, WiFi systems are typically managed by the IEEE 802.11 protocol, which is not reliable in terms of security in data communication. In WiFi networks, data is divided into packets and sent in succession to reduce errors within the radio channel. The IEEE 802.11 protocol has high probability for loss of packets or delay in their transmission. In order to ensure the reliability of data transmission times between two terminal units connected by WiFi stations, a new protocol was derived by modifying the IEEE 802.11. The improvements of the new protocol were highlighted and its capability for the diagnostic service was verified. The modified protocol eliminates the danger of collisions between packets and optimizes the transmission time for sending information. 6 refs., 7 tabs., 8 figs.

  10. SCENARIO PLANNING AS LEARNING

    Directory of Open Access Journals (Sweden)

    Antonio Lourenço Junior

    2010-10-01

    Full Text Available Scenario Planning has been increasingly used, from its introduction to the decision process as effective tools to test decisions, and improve performance in a dynamic environment (Chermack, 2005. The purpose of this article is to demonstrate the potential of an experimental Scenario Planning Model to mobilize, encourage and add more content to the organization’s decision making process – mainly with respect to Strategic Plans of two governmental institutions, a pharmaceutical company and a technology education foundation.  This study describes the application stages of a hybrid scenario-planning model – herein referred to as Planning as Learning – via action-research, showing the scenarios resulting from the experiment and describes the main results of an assessment of such practice. In order to do that, two well-established Scenario Planning models (Prospective school and Shell’s model were analyzed. They were used as a reference for the proposition and application of an experimental model in the two study objects. A questionnaire was used to assess the technique impact. It was possible to obtain high levels of reliability. In-depth interviews were also conducted with the participants. At the end, the results confirmed the model efficiency as a basis for decision making in the competitive environment in which the two institutions are inserted, also to encourage the learning process as a group, as observed throughout the work.

  11. 76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2011-08-31

    ... and administer an office on Central Valley Project water conservation best management practices that... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  12. 75 FR 38538 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2010-07-02

    ... to establish and administer an office on Central Valley Project water conservation best management... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  13. An enhanced reliability-oriented workforce planning model for process industry using combined fuzzy goal programming and differential evolution approach

    Science.gov (United States)

    Ighravwe, D. E.; Oke, S. A.; Adebiyi, K. A.

    2018-03-01

    This paper draws on the "human reliability" concept as a structure for gaining insight into the maintenance workforce assessment in a process industry. Human reliability hinges on developing the reliability of humans to a threshold that guides the maintenance workforce to execute accurate decisions within the limits of resources and time allocations. This concept offers a worthwhile point of deviation to encompass three elegant adjustments to literature model in terms of maintenance time, workforce performance and return-on-workforce investments. These fully explain the results of our influence. The presented structure breaks new grounds in maintenance workforce theory and practice from a number of perspectives. First, we have successfully implemented fuzzy goal programming (FGP) and differential evolution (DE) techniques for the solution of optimisation problem in maintenance of a process plant for the first time. The results obtained in this work showed better quality of solution from the DE algorithm compared with those of genetic algorithm and particle swarm optimisation algorithm, thus expressing superiority of the proposed procedure over them. Second, the analytical discourse, which was framed on stochastic theory, focusing on specific application to a process plant in Nigeria is a novelty. The work provides more insights into maintenance workforce planning during overhaul rework and overtime maintenance activities in manufacturing systems and demonstrated capacity in generating substantially helpful information for practice.

  14. Some improvements on adaptive genetic algorithms for reliability-related applications

    Energy Technology Data Exchange (ETDEWEB)

    Ye Zhisheng, E-mail: yez@nus.edu.s [Department of Industrial and Systems Engineering, National University of Singapore, Singapore 119 260 (Singapore); Li Zhizhong [Department of Industrial Engineering, Tsinghua University, beijing 100084 (China); Xie Min [Department of Industrial and Systems Engineering, National University of Singapore, Singapore 119 260 (Singapore)

    2010-02-15

    Adaptive genetic algorithms (GAs) have been shown to be able to improve GA performance in reliability-related optimization studies. However, there are different ways to implement adaptive GAs, some of which are even in conflict with each other. In this study, a simple parameter-adjusting method using mean and variance of each generation is introduced. This method is used to compare two of such conflicting adaptive GA methods: GAs with increasing mutation rate and decreasing crossover rate and GAs with decreasing mutation rate and increasing crossover rate. The illustrative examples indicate that adaptive GAs with decreasing mutation rate and increasing crossover rate finally yield better results. Furthermore, a population disturbance method is proposed to avoid local optimum solutions. This idea is similar to exotic migration to a tribal society. To solve the problem of large solution space, a variable roughening method is also embedded into GA. Two case studies are presented to demonstrate the effectiveness of the proposed method.

  15. Some improvements on adaptive genetic algorithms for reliability-related applications

    International Nuclear Information System (INIS)

    Ye Zhisheng; Li Zhizhong; Xie Min

    2010-01-01

    Adaptive genetic algorithms (GAs) have been shown to be able to improve GA performance in reliability-related optimization studies. However, there are different ways to implement adaptive GAs, some of which are even in conflict with each other. In this study, a simple parameter-adjusting method using mean and variance of each generation is introduced. This method is used to compare two of such conflicting adaptive GA methods: GAs with increasing mutation rate and decreasing crossover rate and GAs with decreasing mutation rate and increasing crossover rate. The illustrative examples indicate that adaptive GAs with decreasing mutation rate and increasing crossover rate finally yield better results. Furthermore, a population disturbance method is proposed to avoid local optimum solutions. This idea is similar to exotic migration to a tribal society. To solve the problem of large solution space, a variable roughening method is also embedded into GA. Two case studies are presented to demonstrate the effectiveness of the proposed method.

  16. Reliability-based performance simulation for optimized pavement maintenance

    International Nuclear Information System (INIS)

    Chou, Jui-Sheng; Le, Thanh-Son

    2011-01-01

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: →A novel algorithm using multi-objective particle swarm optimization technique. → Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. → A probabilistic model for regression parameters is employed to assess reliability-based performance. → The proposed approach can help decision makers to optimize roadway maintenance plans.

  17. Reliability-based performance simulation for optimized pavement maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Chou, Jui-Sheng, E-mail: jschou@mail.ntust.edu.tw [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China); Le, Thanh-Son [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China)

    2011-10-15

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: > A novel algorithm using multi-objective particle swarm optimization technique. > Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. > A probabilistic model for regression parameters is employed to assess reliability-based performance. > The proposed approach can help decision makers to optimize roadway maintenance plans.

  18. Reliability program plan for the Isotope Brayton Ground Demonstration System (phase I)

    International Nuclear Information System (INIS)

    1975-01-01

    The reliability and quality assurance organizational relationships, the methods to be used, the tasks to be completed, and the documentation to be published are presented. The total program is intended to provide the necessary reliability and quality assurance associated with the design, fabrication, and testing of the GDS. It is consistent with the general objectives of the ERDA Quality Assurance (QA) program requirements document ''SNS-1'' dated April 1972 and reliability program requirements document ''SNS-2'' dated 17 June 1974 but has been specifically modified for the GDS with the intent of establishing background data for the subsequent Phase II effort

  19. Review and action plan for oral health improvement in Sheffield special schools.

    Science.gov (United States)

    Worsley, D J; Jones, K; Harris, J C; Charlesworth, J; Marshman, Z

    2018-03-01

    A description of the process of a review of oral health improvement in special schools in Sheffield and the implementation of an action plan for these activities. Public health competencies encompassed: assessing the evidence on oral health and dental interventions, programmes and services; strategic leadership and collaborative working for health; oral health improvement. Copyright© 2018 Dennis Barber Ltd.

  20. The Outcome and Assessment Information Set (OASIS): A Review of Validity and Reliability

    Science.gov (United States)

    O’CONNOR, MELISSA; DAVITT, JOAN K.

    2015-01-01

    The Outcome and Assessment Information Set (OASIS) is the patient-specific, standardized assessment used in Medicare home health care to plan care, determine reimbursement, and measure quality. Since its inception in 1999, there has been debate over the reliability and validity of the OASIS as a research tool and outcome measure. A systematic literature review of English-language articles identified 12 studies published in the last 10 years examining the validity and reliability of the OASIS. Empirical findings indicate the validity and reliability of the OASIS range from low to moderate but vary depending on the item studied. Limitations in the existing research include: nonrepresentative samples; inconsistencies in methods used, items tested, measurement, and statistical procedures; and the changes to the OASIS itself over time. The inconsistencies suggest that these results are tentative at best; additional research is needed to confirm the value of the OASIS for measuring patient outcomes, research, and quality improvement. PMID:23216513

  1. Reliability data book

    International Nuclear Information System (INIS)

    Bento, J.P.; Boerje, S.; Ericsson, G.; Hasler, A.; Lyden, C.O.; Wallin, L.; Poern, K.; Aakerlund, O.

    1985-01-01

    The main objective for the report is to improve failure data for reliability calculations as parts of safety analyses for Swedish nuclear power plants. The work is based primarily on evaluations of failure reports as well as information provided by the operation and maintenance staff of each plant. In the report are presented charts of reliability data for: pumps, valves, control rods/rod drives, electrical components, and instruments. (L.E.)

  2. Reliability in automotive and mechanical engineering determination of component and system reliability

    CERN Document Server

    Bertsche, Bernd

    2008-01-01

    In the present contemporary climate of global competition in every branch of engineering and manufacture it has been shown from extensive customer surveys that above every other attribute, reliability stands as the most desired feature in a finished product. To survive this relentless fight for survival any organisation, which neglect the plea of attaining to excellence in reliability, will do so at a serious cost Reliability in Automotive and Mechanical Engineering draws together a wide spectrum of diverse and relevant applications and analyses on reliability engineering. This is distilled into this attractive and well documented volume and practising engineers are challenged with the formidable task of simultaneously improving reliability and reducing the costs and down-time due to maintenance. The volume brings together eleven chapters to highlight the importance of the interrelated reliability and maintenance disciplines. They represent the development trends and progress resulting in making this book ess...

  3. Non-periodic preventive maintenance with reliability thresholds for complex repairable systems

    International Nuclear Information System (INIS)

    Lin, Zu-Liang; Huang, Yeu-Shiang; Fang, Chih-Chiang

    2015-01-01

    In general, a non-periodic condition-based PM policy with different condition variables is often more effective than a periodic age-based policy for deteriorating complex repairable systems. In this study, system reliability is estimated and used as the condition variable, and three reliability-based PM models are then developed with consideration of different scenarios which can assist in evaluating the maintenance cost for each scenario. The proposed approach provides the optimal reliability thresholds and PM schedules in advance by which the system availability and quality can be ensured and the organizational resources can be well prepared and managed. The results of the sensitivity anlysis indicate that PM activities performed at a high reliability threshold can not only significantly improve the system availability but also efficiently extend the system lifetime, although such a PM strategy is more costly than that for a low reliabiltiy threshold. The optimal reliability threshold increases along with the number of PM activities to prevent future breakdowns caused by severe deterioration, and thus substantially reduces repair costs. - Highlights: • The PM problems for repairable deteriorating systems are formulated. • The structural properties of the proposed PM models are investigated. • The corresponding algorithms to find the optimal PM strategies are provided. • Imperfect PM activities are allowed to reduce the occurences of breakdowns. • Provide managers with insights about the critical factors in the planning stage

  4. Bootstrap analysis of designed experiments for reliability improvement with a non-constant scale parameter

    International Nuclear Information System (INIS)

    Wang, Guodong; He, Zhen; Xue, Li; Cui, Qingan; Lv, Shanshan; Zhou, Panpan

    2017-01-01

    Factors which significantly affect product reliability are of great interest to reliability practitioners. This paper proposes a bootstrap-based methodology for identifying significant factors when both location and scale parameters of the smallest extreme value distribution vary over experimental factors. An industrial thermostat experiment is presented, analyzed, and discussed as an illustrative example. The analysis results show that 1) the misspecification of a constant scale parameter may lead to misidentify spurious effects; 2) the important factors identified by different bootstrap methods (i.e., percentile bootstrapping, bias-corrected percentile bootstrapping, and bias-corrected and accelerated percentile bootstrapping) are different; 3) the number of factors affecting 10th percentile lifetime significantly is less than the number of important factors identified at 63.21th percentile. - Highlights: • Product reliability is improved by design of experiments under both scale and location parameters of smallest extreme value distribution vary with experimental factors. • A bootstrap-based methodology is proposed to identify important factors which affect 100pth lifetime percentile significantly. • Bootstrapping confidence intervals associating experimental factors are obtained by using three bootstrap methods (i.e., percentile bootstrapping, bias-corrected percentile bootstrapping, and bias-corrected and accelerated percentile bootstrapping). • The important factors identified by different bootstrap methods are different. • The number of factors affecting 10th percentile significantly is less than the number of important factors identified at 63.21th percentile.

  5. 76 FR 58716 - Interpretation of Transmission Planning Reliability Standard

    Science.gov (United States)

    2011-09-22

    ..., Western Public Agencies Group, Western Montana Electric G&T Cooperative, Inc., Oregon Municipal Electric... Enforcement of Electric Reliability Standards, Order No. 672, FERC Stats. & Regs. ] 31,204, order on reh'g... FERC ] 61,062, order on reh'g & compliance, 117 FERC ] 61,126 (2006), aff'd sub nom. Alcoa, Inc. v...

  6. Reliability analysis techniques in power plant design

    International Nuclear Information System (INIS)

    Chang, N.E.

    1981-01-01

    An overview of reliability analysis techniques is presented as applied to power plant design. The key terms, power plant performance, reliability, availability and maintainability are defined. Reliability modeling, methods of analysis and component reliability data are briefly reviewed. Application of reliability analysis techniques from a design engineering approach to improving power plant productivity is discussed. (author)

  7. Launch and Assembly Reliability Analysis for Human Space Exploration Missions

    Science.gov (United States)

    Cates, Grant; Gelito, Justin; Stromgren, Chel; Cirillo, William; Goodliff, Kandyce

    2012-01-01

    NASA's future human space exploration strategy includes single and multi-launch missions to various destinations including cis-lunar space, near Earth objects such as asteroids, and ultimately Mars. Each campaign is being defined by Design Reference Missions (DRMs). Many of these missions are complex, requiring multiple launches and assembly of vehicles in orbit. Certain missions also have constrained departure windows to the destination. These factors raise concerns regarding the reliability of launching and assembling all required elements in time to support planned departure. This paper describes an integrated methodology for analyzing launch and assembly reliability in any single DRM or set of DRMs starting with flight hardware manufacturing and ending with final departure to the destination. A discrete event simulation is built for each DRM that includes the pertinent risk factors including, but not limited to: manufacturing completion; ground transportation; ground processing; launch countdown; ascent; rendezvous and docking, assembly, and orbital operations leading up to trans-destination-injection. Each reliability factor can be selectively activated or deactivated so that the most critical risk factors can be identified. This enables NASA to prioritize mitigation actions so as to improve mission success.

  8. Cooperative path planning for multi-USV based on improved artificial bee colony algorithm

    Science.gov (United States)

    Cao, Lu; Chen, Qiwei

    2018-03-01

    Due to the complex constraints, more uncertain factors and critical real-time demand of path planning for multiple unmanned surface vehicle (multi-USV), an improved artificial bee colony (I-ABC) algorithm were proposed to solve the model of cooperative path planning for multi-USV. First the Voronoi diagram of battle field space is conceived to generate the optimal area of USVs paths. Then the chaotic searching algorithm is used to initialize the collection of paths, which is regard as foods of the ABC algorithm. With the limited data, the initial collection can search the optimal area of paths perfectly. Finally simulations of the multi-USV path planning under various threats have been carried out. Simulation results verify that the I-ABC algorithm can improve the diversity of nectar source and the convergence rate of algorithm. It can increase the adaptability of dynamic battlefield and unexpected threats for USV.

  9. A New Method of Global Path Planning for AGV

    Institute of Scientific and Technical Information of China (English)

    SHI En-xiu; HUANG Yu-mei

    2006-01-01

    Path planning is important in the research of a mobile robot (MR). Methods for it have been used in different applications. An automated guided vehicle(AGV), which is a kind of MR, is used in a flexible manufacturing system(FMS). Path planning for it is essential to improve the efficiency of FMS. A new method was proposed with known obstacle space FMS in this paper. FMS is described by the Augmented Pos Matrix of a Machine (APMM) and Relative Pos Matrix of Machines (RPMM), which is smaller. The optimum path can be obtained according to the probability of the path and the maximal probability path. The suggested algorithm of path planning was good performance through simulation result: simplicity, saving time and reliability.

  10. Improving Retention and Enrollment Forecasting in Part-Time Programs

    Science.gov (United States)

    Shapiro, Joel; Bray, Christopher

    2011-01-01

    This article describes a model that can be used to analyze student enrollment data and can give insights for improving retention of part-time students and refining institutional budgeting and planning efforts. Adult higher-education programs are often challenged in that part-time students take courses less reliably than full-time students. For…

  11. Demonstration of reliability centered maintenance

    International Nuclear Information System (INIS)

    Schwan, C.A.; Morgan, T.A.

    1991-04-01

    Reliability centered maintenance (RCM) is an approach to preventive maintenance planning and evaluation that has been used successfully by other industries, most notably the airlines and military. Now EPRI is demonstrating RCM in the commercial nuclear power industry. Just completed are large-scale, two-year demonstrations at Rochester Gas ampersand Electric (Ginna Nuclear Power Station) and Southern California Edison (San Onofre Nuclear Generating Station). Both demonstrations were begun in the spring of 1988. At each plant, RCM was performed on 12 to 21 major systems. Both demonstrations determined that RCM is an appropriate means to optimize a PM program and improve nuclear plant preventive maintenance on a large scale. Such favorable results had been suggested by three earlier EPRI pilot studies at Florida Power ampersand Light, Duke Power, and Southern California Edison. EPRI selected the Ginna and San Onofre sites because, together, they represent a broad range of utility and plant size, plant organization, plant age, and histories of availability and reliability. Significant steps in each demonstration included: selecting and prioritizing plant systems for RCM evaluation; performing the RCM evaluation steps on selected systems; evaluating the RCM recommendations by a multi-disciplinary task force; implementing the RCM recommendations; establishing a system to track and verify the RCM benefits; and establishing procedures to update the RCM bases and recommendations with time (a living program). 7 refs., 1 tab

  12. Measuring the quality of Patients’ goals and action plans: development and validation of a novel tool

    Directory of Open Access Journals (Sweden)

    Teal Cayla R

    2012-12-01

    Full Text Available Abstract Background The purpose of this study is to develop and test reliability, validity, and utility of the Goal-Setting Evaluation Tool for Diabetes (GET-D. The effectiveness of diabetes self-management is predicated on goal-setting and action planning strategies. Evaluation of self-management interventions is hampered by the absence of tools to assess quality of goals and action plans. To address this gap, we developed the GET-D, a criteria-based, observer rating scale that measures the quality of patients’ diabetes goals and action plans. Methods We conducted 3-stage development of GET-D, including identification of criteria for observer ratings of goals and action plans, rater training and pilot testing; and then performed psychometric testing of the GET-D. Results Trained raters could effectively rate the quality of patient-generated goals and action plans using the GET-D. Ratings performed by trained evaluators demonstrated good raw agreement (94.4% and inter-rater reliability (Kappa = 0.66. Scores on the GET-D correlated well with measures theoretically associated with goal-setting, including patient activation (r=.252, P Conclusions The GET-D can reliably and validly rate the quality of goals and action plans. It holds promise as a measure of intervention fidelity for clinical interventions that promote diabetes self-management behaviors to improve clinical outcomes. Trial registration Clinicaltrials.gov Identifier: NCT00481286

  13. Using a thermoluminescent dosimeter to evaluate the location reliability of the highest–skin dose area detected by treatment planning in radiotherapy for breast cancer

    Energy Technology Data Exchange (ETDEWEB)

    Sun, Li-Min, E-mail: limin.sun@yahoo.com [Department of Radiation Oncology, Zuoying Branch of Kaohsiung Armed Forces General Hospital, Kaohsiung City, Taiwan (China); Huang, Chih-Jen [Department of Radiation Oncology, Kaohsiung Medical University Hospital, Kaohsiung Medical University, Kaohsiung City, Taiwan (China); Faculty of Medicine, Kaohsiung Medical University Hospital, Kaohsiung Medical University, Kaohsiung City, Taiwan (China); College of Medicine, Kaohsiung Medical University Hospital, Kaohsiung Medical University, Kaohsiung City, Taiwan (China); Chen, Hsiao-Yun [Department of Radiation Oncology, Kaohsiung Medical University Hospital, Kaohsiung Medical University, Kaohsiung City, Taiwan (China); Meng, Fan-Yun [Department of General Surgery, Zuoying Branch of Kaohsiung Armed Forces General Hospital, Kaohsiung City, Taiwan (China); Lu, Tsung-Hsien [Department of Radiation Oncology, Zuoying Branch of Kaohsiung Armed Forces General Hospital, Kaohsiung City, Taiwan (China); Tsao, Min-Jen [Department of General Surgery, Zuoying Branch of Kaohsiung Armed Forces General Hospital, Kaohsiung City, Taiwan (China)

    2014-01-01

    Acute skin reaction during adjuvant radiotherapy for breast cancer is an inevitable process, and its severity is related to the skin dose. A high–skin dose area can be speculated based on the isodose distribution shown on a treatment planning. To determine whether treatment planning can reflect high–skin dose location, 80 patients were collected and their skin doses in different areas were measured using a thermoluminescent dosimeter to locate the highest–skin dose area in each patient. We determined whether the skin dose is consistent with the highest-dose area estimated by the treatment planning of the same patient. The χ{sup 2} and Fisher exact tests revealed that these 2 methods yielded more consistent results when the highest-dose spots were located in the axillary and breast areas but not in the inframammary area. We suggest that skin doses shown on the treatment planning might be a reliable and simple alternative method for estimating the highest skin doses in some areas.

  14. Using a thermoluminescent dosimeter to evaluate the location reliability of the highest–skin dose area detected by treatment planning in radiotherapy for breast cancer

    International Nuclear Information System (INIS)

    Sun, Li-Min; Huang, Chih-Jen; Chen, Hsiao-Yun; Meng, Fan-Yun; Lu, Tsung-Hsien; Tsao, Min-Jen

    2014-01-01

    Acute skin reaction during adjuvant radiotherapy for breast cancer is an inevitable process, and its severity is related to the skin dose. A high–skin dose area can be speculated based on the isodose distribution shown on a treatment planning. To determine whether treatment planning can reflect high–skin dose location, 80 patients were collected and their skin doses in different areas were measured using a thermoluminescent dosimeter to locate the highest–skin dose area in each patient. We determined whether the skin dose is consistent with the highest-dose area estimated by the treatment planning of the same patient. The χ 2 and Fisher exact tests revealed that these 2 methods yielded more consistent results when the highest-dose spots were located in the axillary and breast areas but not in the inframammary area. We suggest that skin doses shown on the treatment planning might be a reliable and simple alternative method for estimating the highest skin doses in some areas

  15. Nurse manager succession planning: synthesis of the evidence.

    Science.gov (United States)

    Titzer, Jennifer; Phillips, Tracy; Tooley, Stephanie; Hall, Norma; Shirey, Maria

    2013-10-01

    The literature supporting nurse manager succession planning is reviewed and synthesised to discover best practice for identifying and developing future nurse managers. Healthcare succession planning practices are lacking. Nurse managers are historically selected based on clinical skills and lack formal leadership preparation. A systematic literature search appraises and summarises the current literature supporting nurse manager succession planning. Multiple reviewers were used to increase the reliability and validity of article selection and analysis. New nurse managers require months to adapt to their positions. Deliberate nurse manager succession planning should be integrated in the organisation's strategic plan and provide a proactive method for identifying and developing potential leaders. Organisations that identify and develop internal human capital can improve role transition, reduce nurse manager turnover rates and decrease replacement costs. Despite the clear benefits of succession planning, studies show that resource allocation for proactive, deliberate development of current and future nurse leaders is lacking. Additionally, systematic evaluation of succession planning is limited. Deliberate succession planning efforts and appropriate resource allocation require strategic planning and evaluation methods. Detailed evaluation methods demonstrating a positive return on investment utilising a cost-benefit analysis and empirical outcomes are necessary. © 2013 John Wiley & Sons Ltd.

  16. Improved robotic stereotactic body radiation therapy plan quality and planning efficacy for organ-confined prostate cancer utilizing overlap-volume histogram-driven planning methodology

    International Nuclear Information System (INIS)

    Wu, Binbin; Pang, Dalong; Lei, Siyuan; Gatti, John; Tong, Michael; McNutt, Todd; Kole, Thomas; Dritschilo, Anatoly; Collins, Sean

    2014-01-01

    Background and purpose: This study is to determine if the overlap-volume histogram (OVH)-driven planning methodology can be adapted to robotic SBRT (CyberKnife Robotic Radiosurgery System) to further minimize the bladder and rectal doses achieved in plans manually-created by clinical planners. Methods and materials: A database containing clinically-delivered, robotic SBRT plans (7.25 Gy/fraction in 36.25 Gy) of 425 patients with localized prostate cancer was used as a cohort to establish an organ’s distance-to-dose model. The OVH-driven planning methodology was refined by adding the PTV volume factor to counter the target’s dose fall-off effect and incorporated into Multiplan to automate SBRT planning. For validation, automated plans (APs) for 12 new patients were generated, and their achieved dose/volume values were compared to the corresponding manually-created, clinically-delivered plans (CPs). A two-sided, Wilcoxon rank-sum test was used for statistical comparison with a significance level of p < 0.05. Results: PTV’s V(36.25 Gy) was comparable: 95.6% in CPs comparing to 95.1% in APs (p = 0.2). On average, the refined approach lowered V(18.12 Gy) to the bladder and rectum by 8.2% (p < 0.05) and 6.4% (p = 0.14). A physician confirmed APs were clinically acceptable. Conclusions: The improvements in APs could further reduce toxicities observed in SBRT for organ-confined prostate cancer

  17. Planning Irreversible Electroporation in the Porcine Kidney: Are Numerical Simulations Reliable for Predicting Empiric Ablation Outcomes?

    International Nuclear Information System (INIS)

    Wimmer, Thomas; Srimathveeravalli, Govindarajan; Gutta, Narendra; Ezell, Paula C.; Monette, Sebastien; Maybody, Majid; Erinjery, Joseph P.; Durack, Jeremy C.; Coleman, Jonathan A.; Solomon, Stephen B.

    2015-01-01

    PurposeNumerical simulations are used for treatment planning in clinical applications of irreversible electroporation (IRE) to determine ablation size and shape. To assess the reliability of simulations for treatment planning, we compared simulation results with empiric outcomes of renal IRE using computed tomography (CT) and histology in an animal model.MethodsThe ablation size and shape for six different IRE parameter sets (70–90 pulses, 2,000–2,700 V, 70–100 µs) for monopolar and bipolar electrodes was simulated using a numerical model. Employing these treatment parameters, 35 CT-guided IRE ablations were created in both kidneys of six pigs and followed up with CT immediately and after 24 h. Histopathology was analyzed from postablation day 1.ResultsAblation zones on CT measured 81 ± 18 % (day 0, p ≤ 0.05) and 115 ± 18 % (day 1, p ≤ 0.09) of the simulated size for monopolar electrodes, and 190 ± 33 % (day 0, p ≤ 0.001) and 234 ± 12 % (day 1, p ≤ 0.0001) for bipolar electrodes. Histopathology indicated smaller ablation zones than simulated (71 ± 41 %, p ≤ 0.047) and measured on CT (47 ± 16 %, p ≤ 0.005) with complete ablation of kidney parenchyma within the central zone and incomplete ablation in the periphery.ConclusionBoth numerical simulations for planning renal IRE and CT measurements may overestimate the size of ablation compared to histology, and ablation effects may be incomplete in the periphery

  18. Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test Report

    Energy Technology Data Exchange (ETDEWEB)

    Keller, Jonathan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wallen, Robb [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-02-24

    Many gearboxes in wind turbines do not achieve their expected design life; they do, however, commonly meet or exceed the design criteria specified in current standards in the gear, bearing, and wind turbine industry as well as third-party certification criteria. The cost of gearbox replacements and rebuilds, as well as the downtime associated with these failures, increases the cost of wind energy. In 2007, the U.S. Department of Energy established the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC). Its goals are to understand the root causes of premature gearbox failures and to improve their reliability. The GRC is examining a hypothesis that the gap between design-estimated and actual wind turbine gearbox reliability is caused by underestimation of loads, inaccurate design tools, the absence of critical elements in the design process, or insufficient testing. This report describes the recently completed tests of GRC Gearbox 3 in the National Wind Technology Center dynamometer and documents any modifications to the original test plan. In this manner, it serves as a guide for interpreting the publicly released data sets with brief analyses to illustrate the data. The primary test objective was to measure the planetary load-sharing characteristics in the same conditions as the original GRC gearbox design. If the measured load-sharing characteristics are close to the design model, the projected improvement in planetary section fatigue life and the efficacy of preloaded TRBs in mitigating the planetary bearing fatigue failure mode will have been demonstrated. Detailed analysis of that test objective will be presented in subsequent publications.

  19. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  20. THE RELATIVISTIC HEAVY ION COLLIDER (RHIC) CRYOGENIC SYSTEM AT BNL: REVIEW OF THE MODIFICATIONS AND UPGRADES SINCE 2002 AND PLANNED IMPROVEMENTS

    International Nuclear Information System (INIS)

    THAN, Y.R.; TUOZZOLO, J.; SIDI-YAKHLEF, A.; GANNI, V.; KNUDSEN, P.; ARENIUS, D.

    2007-01-01

    Brookhaven National Laboratory continues its multi-year program to improve the operational efficiency, reliability, and stability of the cryogenic system which also resulted in improved beam availability of the Relativistic Heavy Ion Collider (RHIC). This paper summarizes the work and changes made after each phase over the past four years to the present, as well as proposed future improvements. Power usage dropped from an initial 9.4 MW to the present 5.1 MW and is expected to drop below 5 MW after the completion of the remaining proposed improvements. The work proceeded in phases by balancing the Collider's schedule of operation, time required for the modifications and budget constraints. The main changes include process control, compressor oil removal and management, elimination of the use of cold compressors and two liquid helium storage tanks, insulation of the third liquid helium storage tank, compressor bypass flow reduction and the addition of a load turbine (Joule-Thompson expander) with associated heat exchangers at the cold end of the plant. Also, liquid helium pumps used for forced circulation of the sub-cooled helium through the magnet loops were eliminated by an accelerator supply flow reconfiguration. Planned future upgrades include the resizing of expanders 5 and 6 to increase their efficiencies