WorldWideScience

Sample records for planned islanding operation

  1. Frequency analysis for planned islanding operation in the Danish distribution system - Bornholm

    DEFF Research Database (Denmark)

    Chen, Yu; Xu, Zhao; Østergaard, Jacob

    2008-01-01

    a planned islanding operation test. To evaluate the test and achieve useful experience for future similar operations in Bornholm or even in other similar systems, the frequency data before, during and after this period, were recorded by Phasor Measurement Units (PMUs), supplied by Centre for Electric...

  2. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.J.

    1980-07-01

    The NRC plan defines the functional role of the NRC in cleanup operations at Three Mile Island Unit 2 to assure that agency regulatory responsibilities and objectives will be fulfilled. The plan outlines NRC functions in TMI-2 cleanup operations in the following areas: (1) the functional relationship of NRC to other government agencies, the public, and the licensee to coordinate activities, (2) the functional roles of these organizations in cleanup operations, (3) the NRC review and decision-making procedure for the licensee's proposed cleanup operation, (4) the NRC/licensee estimated schedule of major actions, and (5) NRC's functional role in overseeing implementation of approved licensee activities

  3. PMU Frequency Data Processing for A Planned Islanding Operation in Bornholm

    DEFF Research Database (Denmark)

    (PMU) system in Bornholm during the planned islanding operation first, as it has high time resolution and it is synchronized to Global Position System (GPS). However, there were some problems with the PMU system during the islanding period, which made the data not as complete as expected. This paper...... describes the problems and provides proposals for a data processing procedure to ensure that the improved frequency data are acceptable for statistics analysis. The proposed data processing procedure is described and evaluated. Furthermore, this paper provides a reference for future PMU data acquisition...... and processing. Individually, section I in the paper generally describes the background for islanding operation and the Bornholm system. Section II introduces the installed PMU measurement system, followed by section III, which describes the PMU original frequency data, the problems during the acquisition...

  4. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.

    1982-02-01

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  5. Islanded operation of distribution networks

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This report summarises the results of a study assessing the benefits and risks to distribution network of generator islanding and examining the technical, commercial and regulatory changes required to facilitate the operation of islanding. The background to the study is traced, and details are given of a literature review, the technical criteria for operating sections of the network in islanding mode, and the impact of islanding on trading. Case studies and a detailed implementation plan, data acquisition, and commercial incentives are discussed.

  6. Islanded operation of distribution networks

    International Nuclear Information System (INIS)

    2005-01-01

    This report summarises the results of a study assessing the benefits and risks to distribution network of generator islanding and examining the technical, commercial and regulatory changes required to facilitate the operation of islanding. The background to the study is traced, and details are given of a literature review, the technical criteria for operating sections of the network in islanding mode, and the impact of islanding on trading. Case studies and a detailed implementation plan, data acquisition, and commercial incentives are discussed

  7. Islanded operation of distributed networks

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This report summarises the findings of a study to investigate the regulatory, commercial and technical risks and benefits associated with the operation of distributed generation to power an islanded section of distributed network. A review of published literature was carried out, and UK generators were identified who could operate as part of an island network under the existing technical, regulatory, and safety framework. Agreement on case studies for consideration with distributed network operators (DNOs) is discussed as well as the quantification of the risks, benefits and costs of islanding, and the production of a case implementation plan for each case study. Technical issues associated with operating sections of network in islanded mode are described, and impacts of islanding on trading and settlement, and technical and commercial modelling are explored.

  8. Islanded operation of distributed networks

    International Nuclear Information System (INIS)

    2005-01-01

    This report summarises the findings of a study to investigate the regulatory, commercial and technical risks and benefits associated with the operation of distributed generation to power an islanded section of distributed network. A review of published literature was carried out, and UK generators were identified who could operate as part of an island network under the existing technical, regulatory, and safety framework. Agreement on case studies for consideration with distributed network operators (DNOs) is discussed as well as the quantification of the risks, benefits and costs of islanding, and the production of a case implementation plan for each case study. Technical issues associated with operating sections of network in islanded mode are described, and impacts of islanding on trading and settlement, and technical and commercial modelling are explored

  9. Application of Hybrid Meta-Heuristic Techniques for Optimal Load Shedding Planning and Operation in an Islanded Distribution Network Integrated with Distributed Generation

    Directory of Open Access Journals (Sweden)

    Jafar Jallad

    2018-05-01

    Full Text Available In a radial distribution network integrated with distributed generation (DG, frequency and voltage instability could occur due to grid disconnection, which would result in an islanded network. This paper proposes an optimal load shedding scheme to balance the electricity demand and the generated power of DGs. The integration of the Firefly Algorithm and Particle Swarm Optimization (FAPSO is proposed for the application of the planned load shedding and under frequency load shedding (UFLS scheme. In planning mode, the hybrid optimization maximizes the amount of load remaining and improves the voltage profile of load buses within allowable limits. Moreover, the hybrid optimization can be used in UFLS scheme to identify the optimal combination of loads that need to be shed from a network in operation mode. In order to assess the capabilities of the hybrid optimization, the IEEE 33-bus radial distribution system and part of the Malaysian distribution network with different types of DGs were used. The response of the proposed optimization method in planning and operation were compared with other optimization techniques. The simulation results confirmed the effectiveness of the proposed hybrid optimization in planning mode and demonstrated that the proposed UFLS scheme is quick enough to restore the system frequency without overshooting in less execution time.

  10. Operation planning device

    International Nuclear Information System (INIS)

    Watanabe, Takashi; Odakawa, Naoto; Erikuchi, Makoto; Okada, Masayuki; Koizumi, Atsuhiko.

    1996-01-01

    The device of the present invention provides a device suitable for monitoring a reactor core state and operation replanning in terms of reactor operation. Namely, (1) an operation result difference judging means judges that replanning is necessary when the operation results deviates from the operation planning, (2) an operation replanning rule data base storing means stores a deviation key which shows various kinds of states where the results deviate from the planning and a rule for replanning for returning to the operation planning on every deviating key, (3) an operation replanning means forms a new operation planning in accordance with the rule which is retrieved based on the deviation key, (4) an operation planning optimizing rule data base storing means evaluates the reformed planning and stores it on every evaluation item, (5) an operation planning optimization means correct the operation planning data so as to be optimized when the evaluation of the means (4) is less than a reference value, and (6) an operation planning display means edits adaptable operation planning data and the result of the evaluation and displays them. (I.S.)

  11. Managing Disaster in the Ionian Sea: Planning and Optimizing Logistics for Disaster Relief Operations for the Island of Kefalonia

    Science.gov (United States)

    2010-06-01

    the last similar event. The BPT distribution is named after the Scottish botanist Robert Brown (1866), who observed the seemingly random movement of...ports of the island. The communities (towns or villages) are connected with each other and their capital by narrow rural roads that are shown in

  12. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  13. Joint Operation Planning

    National Research Council Canada - National Science Library

    2006-01-01

    .... It sets forth joint doctrine to govern the joint operation planning activities and performance of the Armed Forces of the United States in joint operations, and provides the joint doctrinal basis...

  14. Biomedical programs operations plans

    Science.gov (United States)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  15. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2015-01-01

    This paper investigates sales and operations planning (S&OP) at four Scandinavian industrial food producers in order to explore how the use of S&OP might help leaders to deal with the challenges set by the planning environment. Variables connected to the product and market, e.g., frequency of new...

  16. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2013-01-01

    This paper explores how the use of sales and operations planning (S&OP) may deal with the challenges set by the planning environment by investigating S&OP at four Scandinavian industrial food producers. Variables connected to the product and market, e.g. perishability, customer service elements...

  17. Operation Chromite: Amphibious Planning

    OpenAIRE

    2005-01-01

    tut present Tutorial Presentation Interactive Media Element This interactive tutorial covers the Inchon landing case study that provides several good examples of the types of decisions made during the amphibious planning process, and how they compare to the current matrix of the ten primary decisions for amphibious operation required today by joint doctrine. Operation Chromite is used as an example. 8808A Warfighting from the Sea: Amphibious Operations

  18. Island in an island – The suggestions for transportation improvement plan for Haidian Island, Haikou, Hainan

    Directory of Open Access Journals (Sweden)

    Sia Rosalind Juo Ling

    2017-01-01

    Full Text Available Haidian Island, which situated at the Northern part of Haikou City of Hainan Province, is an island within a city. Haidian Island is unique in term of it's development which centered around an university, the Hainan University, besides some others important landmarks, such as Haikou city hospital, Baishamen municipal park, Golf Driving Range etc. All commercials, residential, recreational activities etc are planned to serve Hainan University in particular. The study, taking ‘Haidian Island Area Development Control Plan’ as case study, would like to look into the importance of transportation and traffic planning. The study used observation, site investigation and traffic study methods to gather data needed. Firstly the study analyzed the current state of transportation system for Haidian Island in accordance to the Island Development Control plan and Haikou master plan and identified the problems. Then, the study made some recommendations for these problems. The study highlighted the important of non-motorized, cycling and walking as the main transportation system for an education-based island and as supportive to domestic tourism activities found. The transportation planning suggested by the study took ‘green and low-carbon’ approaches considered the role of University as the core activity in the island.

  19. Control and Operation of Islanded Distribution System

    DEFF Research Database (Denmark)

    Mahat, Pukar

    deviation and real power shift. When a distribution system, with all its generators operating at maximum power, is islanded, the frequency will go down if the total load is more than the total generation. An under-frequency load shedding procedure for islanded distribution systems with DG unit(s) based...... states. Short circuit power also changes when some of the generators in the distribution system are disconnected. This may result in elongation of fault clearing time and hence disconnection of equipments (including generators) in the distribution system or unnecessary operation of protective devices...... operational challenges. But, on the other hand, it has also opened up some opportunities. One opportunity/challenge is an islanded operation of a distribution system with DG unit(s). Islanding is a situation in which a distribution system becomes electrically isolated from the remainder of the power system...

  20. Integrated formal operations plan

    Energy Technology Data Exchange (ETDEWEB)

    Cort, G.; Dearholt, W.; Donahue, S.; Frank, J.; Perkins, B.; Tyler, R.; Wrye, J.

    1994-01-05

    The concept of formal operations (that is, a collection of business practices to assure effective, accountable operations) has vexed the Laboratory for many years. To date most attempts at developing such programs have been based upon rigid, compliance-based interpretations of a veritable mountain of Department of Energy (DOE) orders, directives, notices, and standards. These DOE dictates seldom take the broad view but focus on highly specialized programs isolated from the overall context of formal operations. The result is a confusing array of specific, and often contradictory, requirements that produce a patchwork of overlapping niche programs. This unnecessary duplication wastes precious resources, dramatically increases the complexity of our work processes, and communicates a sense of confusion to our customers and regulators. Coupled with the artificial divisions that have historically existed among the Laboratory`s formal operations organizations (quality assurance, configuration management, records management, training, etc.), this approach has produced layers of increasingly vague and complex formal operations plans, each of which interprets its parent and adds additional requirements of its own. Organizational gridlock ensues whenever an activity attempts to implement these bureaucratic monstrosities. The integrated formal operations plan presented is to establish a set of requirements that must be met by an integrated formal operations program, assign responsibilities for implementation and operation of the program, and specify criteria against which the performance of the program will be measured. The accountable line manager specifies the items, processes, and information (the controlled elements) to which the formal operations program specified applies. The formal operations program is implemented using a graded approach based on the level of importance of the various controlled elements and the scope of the activities in which they are involved.

  1. Automating Space Station operations planning

    Science.gov (United States)

    Ziemer, Kathleen A.

    1989-01-01

    The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.

  2. Distributed Operations Planning

    Science.gov (United States)

    Fox, Jason; Norris, Jeffrey; Powell, Mark; Rabe, Kenneth; Shams, Khawaja

    2007-01-01

    Maestro software provides a secure and distributed mission planning system for long-term missions in general, and the Mars Exploration Rover Mission (MER) specifically. Maestro, the successor to the Science Activity Planner, has a heavy emphasis on portability and distributed operations, and requires no data replication or expensive hardware, instead relying on a set of services functioning on JPL institutional servers. Maestro works on most current computers with network connections, including laptops. When browsing down-link data from a spacecraft, Maestro functions similarly to being on a Web browser. After authenticating the user, it connects to a database server to query an index of data products. It then contacts a Web server to download and display the actual data products. The software also includes collaboration support based upon a highly reliable messaging system. Modifications made to targets in one instance are quickly and securely transmitted to other instances of Maestro. The back end that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

  3. Space shuttle operations integration plan

    Science.gov (United States)

    1975-01-01

    The Operations Integration Plan is presented, which is to provide functional definition of the activities necessary to develop and integrate shuttle operating plans and facilities to support flight, flight control, and operations. It identifies the major tasks, the organizations responsible, their interrelationships, the sequence of activities and interfaces, and the resultant products related to operations integration.

  4. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  5. Planning Systems for Distributed Operations

    Science.gov (United States)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  6. Architecture for spacecraft operations planning

    Science.gov (United States)

    Davis, William S.

    1991-01-01

    A system which generates plans for the dynamic environment of space operations is discussed. This system synthesizes plans by combining known operations under a set of physical, functional, and temperal constraints from various plan entities, which are modeled independently but combine in a flexible manner to suit dynamic planning needs. This independence allows the generation of a single plan source which can be compiled and applied to a variety of agents. The architecture blends elements of temperal logic, nonlinear planning, and object oriented constraint modeling to achieve its flexibility. This system was applied to the domain of the Intravehicular Activity (IVA) maintenance and repair aboard Space Station Freedom testbed.

  7. Reactor operation plan preparing device

    International Nuclear Information System (INIS)

    Sano, Hiroki; Maruyama, Hiromi; Kinoshita, Mitsuo; Fukuzaki, Koji; Banto, Masaru; Fukazawa, Yukihisa.

    1993-01-01

    The device comprises a means for retrieving a control rod pattern capable of satisfying a thermal limit upon aimed power/minimum flow rate and providing minimum xenon and a control rod pattern maximum xenon. It further comprises a means for selecting a control rod pattern corresponding to a xenon equilibrium condition, and selecting a control rod which provides a greater thermal margin to provide a control rod operation sequence for each of the patterns. Further, the device comprises an outline plan preparing means and a correction means therefor, a simplified sequence table reference means operated along with sequence change, an operation limit region input means, a control rod operation preferential region changing means, a thermal margin evaluation region and an input means. This can automatically prepare the operation plan, decrease the times for preparation of detailed plans by using the outline plan preparing function, thereby enabling to remarkably shorten the time for preparing of an operation plan. (N.H.)

  8. The Mission Operations Planning Assistant

    Science.gov (United States)

    Schuetzle, James G.

    1987-01-01

    The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.

  9. Lageos assembly operation plan

    Science.gov (United States)

    Brueger, J.

    1975-01-01

    Guidelines and constraints procedures for LAGEOS assembly, operation, and design performance are given. Special attention was given to thermal, optical, and dynamic analysis and testing. The operation procedures illustrate the interrelation and sequence of tasks in a flow diagram. The diagram also includes quality assurance functions for verification of operation tasks.

  10. Space Station Freedom operations planning

    Science.gov (United States)

    Accola, Anne L.; Keith, Bryant

    1989-01-01

    The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

  11. AIS ASM Operational Integration Plan

    Science.gov (United States)

    2013-08-01

    Rack mount computer AIS Radio Interface Ethernet Switch 192.168.0.x Firewall Cable Modem 192.168.0.1 VTS Accred. Boundary AIS ASM Operational... AIS ASM Operational Integration Plan Distribution Statement A: Approved for public release; distribution is unlimited. August 2013 Report No...CD-D-07-15 AIS ASM Operational Integration Plan ii UNCLAS//Public | CG-926 R&DC | I. Gonin, et al. | Public August 2013 N O T I C

  12. Operating Theatre Planning and Scheduling.

    NARCIS (Netherlands)

    Hans, Elias W.; Vanberkel, P.T.; Hall, R.

    2012-01-01

    In this chapter we present a number of approaches to operating theatre planning and scheduling. We organize these approaches hierarchically which serves to illustrate the breadth of problems confronted by researchers. At each hierarchicalplanning level we describe common problems, solution

  13. Planning for large-scale accidents: learning from the Three Mile Island accident

    International Nuclear Information System (INIS)

    Fischer, D.W.

    1981-01-01

    Decision-making issues raised at the Three Mile Island nuclear accident in Pennsylvania are explored. The organizations involved, their interconnections, and decisions are described. The underlying issues bearing on allocation of effort to pre-accident planning and actual accident responses are also noted. Finally, a framework from this effort is used for guiding the planning of operations for future accidents. (author)

  14. 30 CFR 780.14 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 780.14 Section... PLAN § 780.14 Operation plan: Maps and plans. Each application shall contain maps and plans as follows: (a) The maps and plans shall show the lands proposed to be affected throughout the operation and any...

  15. Shuttle operations era planning for flight operations

    Science.gov (United States)

    Holt, J. D.; Beckman, D. A.

    1984-01-01

    The Space Transportation System (STS) provides routine access to space for a wide range of customers in which cargos vary from single payloads on dedicated flights to multiple payloads that share Shuttle resources. This paper describes the flight operations planning process from payload introduction through flight assignment to execution of the payload objectives and the changes that have been introduced to improve that process. Particular attention is given to the factors that influence the amount of preflight preparation necessary to satisfy customer requirements. The partnership between the STS operations team and the customer is described in terms of their functions and responsibilities in the development of a flight plan. A description of the Mission Control Center (MCC) and payload support capabilities completes the overview of Shuttle flight operations.

  16. Improved Governing of Kaplan Turbine Hydropower Plants Operating Island Grids

    OpenAIRE

    Gustafsson, Martin

    2013-01-01

    To reduce the consequences of a major fault in the electric power grid, functioning parts of the grid can be divided into smaller grid islands. The grid islands are operated isolated from the power network, which places new demands on a faster frequency regulation. This thesis investigates a Kaplan turbine hydropower plant operating an island grid. The Kaplan turbine has two control signals, the wicket gate and the turbine blade positions, controlling the mechanical power. The inputs are comb...

  17. WIPP operations planning: an overview

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Cossel, S.C.; Plung, D.L.

    1985-01-01

    The Waste Isolation Pilot Plant (WIPP) is the first-of-a-kind facility for emplacement of radioactive waste in a geologic repository. The concern for safe and efficient operations - coupled with the domestic and international significance of this project - necessitates that WIPP be a ''model plant.'' To develop WIPP as a model plant, a unique planning methodology was employed to identify, evaluate, incorporate, and implement these elements that together will form the best possible overall operation. The resulting improvements in communication among project participants and the smooth transition being made from construction are equally attributable to the methodology employed and the operating program plan developed. 1 fig

  18. 30 CFR 784.23 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 784.23 Section... PLAN § 784.23 Operation plan: Maps and plans. Each application shall contain maps and plans as follows... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  19. Frequency Control for Island Operation of Bornholm Power System

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Wu, Qiuwei; Zhao, Haoran

    2014-01-01

    the primary frequency control and the DG units are used to provide the secondary frequency control. As such, the proposed control scheme can strike a balance of the frequency control speed and the energy used from the BESS for the frequency control support. The real-time model of the Bornholm power system......This paper presents a coordinated control strategy of a battery energy storage system (BESS) and distributed generation (DG) units for the island operation of the Danish island of Bornholm. The Bornholm power system is able to transit from the grid connected operation with the Nordic power system...... to the isolated island operation. In order to ensure the secure island operation, the coordinated control of the BESS and the DG has been proposed to stabilize the frequency of the system after the transition to the island operation. In the proposed coordinate control scheme, the BESS is used to provide...

  20. Gas turbine control for islanding operation of distribution systems

    DEFF Research Database (Denmark)

    Mahat, Pukar; Chen, Zhe; Bak-Jensen, Birgitte

    2009-01-01

    Danish distribution systems are characterized by a significant penetration of small gas turbine generators (GTGs) and fixed speed wind turbine generators (WTGs). Island operation of these distribution systems are becoming a viable option for economical and technical reasons. However, stabilizing...... frequency in an islanded system is one of the major challenges. This paper presents three different gas turbine governors for possible operation of distribution systems in an islanding mode. Simulation results are presented to show the performance of these governors in grid connected and islanding mode....

  1. Emergency planning and operating experience

    International Nuclear Information System (INIS)

    Halpern, O.; Breniere, J.

    1984-01-01

    The purpose of this paper is to derive lessons from operating experience for the planning of emergency measures. This operating experience has two facets: it is obtained not only from the various incidents and accidents which have occurred in countries with nuclear power programmes and from the resulting application of emergency plans but also from the different exercises and simulations carried out in France and in other countries. Experience generally confirms the main approaches selected for emergency plans. The lessons to be derived are of three types: first, it appears necessary to set forth precisely the responsibilities of each person involved in order to prevent a watering-down of decisions in the event of an accident; secondly, considerable improvements need to be made in the different communication networks to be used; and thirdly, small accidents with minor radiological consequences deserve as systematic and thorough an approach as large and more improbable accidents. (author)

  2. Modeling Reef Island Morphodynamics in Profile and Plan View

    Science.gov (United States)

    Ashton, A. D.; Ortiz, A. C.; Lorenzo-Trueba, J.

    2016-12-01

    Reef islands are carbonate detrital landforms perched atop shallow reef flats of atolls and barrier reef systems. Often comprising the only subaerial, inhabitable land of many island chains and island nations, these low-lying, geomorphically active landforms face considerable hazards from climate change. While there hazards include wave overtopping and groundwater salinization, sea-level rise and wave climate change will affect sediment transport and shoreline dynamics, including the possibility for wholesale reorganization of the islands themselves. Here we present a simplified morphodynamic model that can spatially quantify the potential impacts of climate change on reef islands. Using parameterizations of sediment transport pathways and feedbacks from previously presented XBeach modeling results, we investigate how sea-level rise, change in storminess, and different carbonate production rates can affect the profile evolution of reef islands, including feedbacks with the shallow reef flat that bounds the islands offshore (and lagoonward). Model results demonstrate that during rising sea levels, the reef flat can serve as a sediment trap, starving reef islands of detrital sediment that could otherwise fortify the shore against sea-level-rise-driven erosion. On the other hand, if reef flats are currently shallow (likely due to geologic inheritance or biologic cementation processes) such that sea-level rise does not result in sediment accumulation on the flat, reef island shorelines may be more resilient to rising seas. We extend the model in plan view to examine how long-term (decadal) changes in wave approach direction could affect reef island shoreline orientation. We compare model results to historical and geologic change for different case studies on the Marshall Islands. This simplified modeling approach, focusing on boundary dynamics and mass fluxes, provides a quantitative tool to predict the response of reef island environments to climate change.

  3. Rhode Island ITS/CVO business plan : final report

    Science.gov (United States)

    1998-01-01

    The Rhode Island Intelligent Transportation Systems/Commercial Vehicle Operations (ITS/CVO) Institutional Issues Study completed July 1996, substantiated the need for enhanced efficiency and safety in commercial transportation systems and regulation....

  4. Operations program plan: Revision 3

    International Nuclear Information System (INIS)

    1988-07-01

    This document, the Operations Program Plan (OPP), has been developed as the seven-year master plan for operation of WIPP. The OPP was authorized by the Albuquerque Field Office of the Department of Energy (DOE-AL) and that organization's WIPP Project Office (DOE-WPO) in Carlsbad, New Mexico. The OPP is the directive from the DOE-WPO Project Manager as to how the WIPP is to be managed, operated, and administered. As the top tier management document for WIPP, the OPP establishes organizational responsibilities and an organizational structure for the Waste Isolation Division (WID) of Westinghouse Electric Corporation. The OPP sets policy and tone for conducting WIPP operations; it requires and specifically authorizes implementing documents (e.g., manuals). It has also proven instrumental in the budgeting and planning process, most particularly in expediting the preparation of specific budgets and detailed schedules for each of the numerous work packages. The OPP is also used to communicate information about WIPP operations

  5. Review on Islanding Operation of Distribution System with Distributed Generation

    DEFF Research Database (Denmark)

    Mahat, Pukar; Chen, Zhe; Bak-Jensen, Birgitte

    2011-01-01

    The growing environmental concern and various benefits of distributed generation (DG) have resulted in significant penetration of DG in many distribution systems worldwide. One of the major expected benefits of DG is the improvement in the reliability of power supply by supplying load during power...... outage by operating in an island mode. However, there are many challenges to overcome before islanding operation of a distribution system with DG can become a viable solution in future. This paper reviews some of the major challenges with islanding operation and explores some possible solutions...

  6. Warehouse operations planning model for Bausch & Lomb

    NARCIS (Netherlands)

    Atilgan, Ceren

    2009-01-01

    Operations planning is a major part of the Sales& Operations Planning (S&OP) process. It provides an overview on the operations capacity requirements by considering the supply and demand plan. However, Bausch& Lomb does not have a structured operations planning process for their warehouse

  7. Security assessment for intentional island operation in modern power system

    DEFF Research Database (Denmark)

    Chen, Yu; Xu, Zhao; Østergaard, Jacob

    2011-01-01

    be increased. However, when to island or how to ensure the islanded systems can survive the islanding transition is uncertain. This article proposes an Islanding Security Region (ISR) concept to provide security assessment of island operation. By comparing the system operating state with the ISR, the system......There has been a high penetration level of Distributed Generations (DGs) in distribution systems in Denmark. Even more DGs are expected to be installed in the coming years. With that, to utilize them in maintaining the security of power supply is of great concern for Danish utilities. During...... the emergency in the power system, some distribution networks may be intentionally separated from the main grid to avoid complete system collapse. If DGs in those networks could continuously run instead of immediately being shut down, the blackout could be avoided and the reliability of supply could...

  8. Spacelab shaping space operations planning

    Science.gov (United States)

    Steven, F. R.; Reinhold, C.

    1976-01-01

    An up-to-date picture is presented of the organizational structure, the key management personnel, and management relationships of the Spacelab program. Attention is also given to Spacelab's development status and plans for its operations. A number of charts are provided to illustrate the organizational relations. It is pointed out that the parties involved in Spacelab activities must yet resolve questions about ownership of transportation-system elements, payloads, ground support facilities, and data obtained from space missions.

  9. The costs and benefits of embedded generation islanding operation

    Energy Technology Data Exchange (ETDEWEB)

    Castro-Sayas, F.; Clarke, G.D.

    2002-07-01

    This report describes the results of a study commissioned by the UK Department of Trade and Industry to identify the technical, legal and commercial issues of islanded embedded generation and to quantify the costs and benefits. Technical considerations affecting island mode operation include security of supply requirements, the licence duty of distribution network operators (DNOs) to comply with 'group demand' restoration times, 'guaranteed standards' licence requirements governing restoration of supplies to customers, and frequency and voltage control. The economics of islanded embedded generation are discussed and key factors noted.

  10. SMES application for frequency control during islanded microgrid operation

    International Nuclear Information System (INIS)

    Kim, A-Rong; Kim, Gyeong-Hun; Heo, Serim; Park, Minwon; Yu, In-Keun; Kim, Hak-Man

    2013-01-01

    Highlights: ► The operating characteristics of SMES for the frequency control of an islanded microgrid were investigated. ► The SMES contributes well for frequency control in the islanded operation. ► A dual and a single magnet type of SMES have been compared to demonstrate the performances. -- Abstract: This paper analyzes the operating characteristics of a superconducting magnetic energy storage (SMES) for the frequency control of an islanded microgrid operation. In the grid-connected mode of a microgrid, an imbalance between power supply and demand is solved by a power trade with the upstream power grid. The difference in the islanded mode is a critical problem because the microgrid is isolated from any power grid. For this reason, the frequency control during islanded microgrid operation is a challenging issue. A test microgrid in this paper consisted of a wind power generator, a PV generation system, a diesel generator and a load to test the feasibility of the SMES for controlling frequency during islanded operation as well as the transient state varying from the grid-connected mode to the islanded mode. The results show that the SMES contributes well for frequency control in the islanded operation. In addition, a dual and a single magnet type of SMES have been compared to demonstrate the control performance. The dual magnet has the same energy capacity as the single magnet, but there are two superconducting coils and each coil has half inductance of the single magnet. The effectiveness of the SMES application with the simulation results is discussed in detail

  11. SMES application for frequency control during islanded microgrid operation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, A-Rong, E-mail: haven21c@changwon.ac.kr [Changwon National University, Sarim-dong, Changwon 641-773 (Korea, Republic of); Kim, Gyeong-Hun; Heo, Serim; Park, Minwon [Changwon National University, Sarim-dong, Changwon 641-773 (Korea, Republic of); Yu, In-Keun, E-mail: yuik@changwon.ac.kr [Changwon National University, Sarim-dong, Changwon 641-773 (Korea, Republic of); Kim, Hak-Man [University of Incheon, Songdo-dong, Incheon 406-772 (Korea, Republic of)

    2013-01-15

    Highlights: ► The operating characteristics of SMES for the frequency control of an islanded microgrid were investigated. ► The SMES contributes well for frequency control in the islanded operation. ► A dual and a single magnet type of SMES have been compared to demonstrate the performances. -- Abstract: This paper analyzes the operating characteristics of a superconducting magnetic energy storage (SMES) for the frequency control of an islanded microgrid operation. In the grid-connected mode of a microgrid, an imbalance between power supply and demand is solved by a power trade with the upstream power grid. The difference in the islanded mode is a critical problem because the microgrid is isolated from any power grid. For this reason, the frequency control during islanded microgrid operation is a challenging issue. A test microgrid in this paper consisted of a wind power generator, a PV generation system, a diesel generator and a load to test the feasibility of the SMES for controlling frequency during islanded operation as well as the transient state varying from the grid-connected mode to the islanded mode. The results show that the SMES contributes well for frequency control in the islanded operation. In addition, a dual and a single magnet type of SMES have been compared to demonstrate the control performance. The dual magnet has the same energy capacity as the single magnet, but there are two superconducting coils and each coil has half inductance of the single magnet. The effectiveness of the SMES application with the simulation results is discussed in detail.

  12. SMES application for frequency control during islanded microgrid operation

    Science.gov (United States)

    Kim, A.-Rong; Kim, Gyeong-Hun; Heo, Serim; Park, Minwon; Yu, In-Keun; Kim, Hak-Man

    2013-01-01

    This paper analyzes the operating characteristics of a superconducting magnetic energy storage (SMES) for the frequency control of an islanded microgrid operation. In the grid-connected mode of a microgrid, an imbalance between power supply and demand is solved by a power trade with the upstream power grid. The difference in the islanded mode is a critical problem because the microgrid is isolated from any power grid. For this reason, the frequency control during islanded microgrid operation is a challenging issue. A test microgrid in this paper consisted of a wind power generator, a PV generation system, a diesel generator and a load to test the feasibility of the SMES for controlling frequency during islanded operation as well as the transient state varying from the grid-connected mode to the islanded mode. The results show that the SMES contributes well for frequency control in the islanded operation. In addition, a dual and a single magnet type of SMES have been compared to demonstrate the control performance. The dual magnet has the same energy capacity as the single magnet, but there are two superconducting coils and each coil has half inductance of the single magnet. The effectiveness of the SMES application with the simulation results is discussed in detail.

  13. Sustainable power planning for the island of Crete

    International Nuclear Information System (INIS)

    Giatrakos, Georgios P.; Tsoutsos, Theocharis D.; Zografakis, Nikos

    2009-01-01

    Crete, as one of the largest and most touristic islands of the Mediterranean, is facing abrupt population and economic growth tendencies that result in the incessant problem of inability to meet power demand increase. This paper evaluates the island's present electrical energy status, and examines the possibility of further penetration of sustainable energy. Various energy modelling software solutions are examined and evaluated, in order to form scenarios according to the governmental and EU directives for renewable energy sources (RES), as well as to the planned conventional power plant upgrades and LNG transition. RES are fully exploited in the plan's scenarios, always taking into account all technical and legislative limitations. Analysis shows that even the most modest and realistic RES implementation scenarios, combined with a partially successful demand restriction, could indeed contract the island's environmental footprint. RES penetration in Crete's electric seems to be able to surpass 30% by 2020, surpassing even the optimistic EU targets for 20% RES by 2020

  14. LANL continuity of operations plan

    Energy Technology Data Exchange (ETDEWEB)

    Senutovitch, Diane M [Los Alamos National Laboratory

    2010-12-22

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may

  15. Current and future plans for wind energy development on San Clemente Island, California

    Energy Technology Data Exchange (ETDEWEB)

    Hurley, P.J.F. [RLA Consulting, Inc., Bothell, WA (United States); Cable, S.B. [Naval Facilities Engineering Service Center, Port Hueneme, CA (United States)

    1996-12-31

    The Navy is considering possible ways to maximize the use of wind energy technology for power supply to their auxiliary landing field and other facilities on San Clemente Island. A summary of their past analysis and future considerations is presented. An analysis was performed regarding the technical and economic feasibility of installing and operating a sea-water pumped hydro/wind energy system to provide for all of the island`s electric power needs. Follow-on work to the feasibility study include wind resource monitoring as well as procurement and preliminary design activities for a first-phase wind-diesel installation. Future plans include the consideration of alternative siting arrangements and the introduction of on-island fresh water production. 3 refs., 4 figs.

  16. Control principles for blackstart and island operation of microgrid

    Energy Technology Data Exchange (ETDEWEB)

    Laaksonen, H.; Kauhaniemi, K. (University of Vaasa (Finland))

    2008-07-01

    In some unexpected situations a microgrid may become unstable after transition to islanded mode and all DG units must be disconnected from microgrid. In case of these events a restoration strategy for microgrid blackstart is needed. Also if the islanded microgrid is divided into different protection zones in case of a fault, fault management strategy with capability of very fast operation is needed to maintain stability in the healthy section of the islanded microgrid. The control of microgrid voltage and frequency during the microgrid blackstart is not possible without energy storage unit. In this paper sequence of actions for the microgrid blackstart operation as well as control principles of some DG units during blackstart are defined and simulated with two different microgrid configurations. Also one simulation case considering fault management strategy and control principles during fault in islanded microgrid is presented. Based on the simulations dimensioning principles for the needed energy storage and size of simultaneously controlled loads can be drawn. (orig.)

  17. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  18. 78 FR 21245 - Continuity of Operations Plan

    Science.gov (United States)

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  19. 77 FR 43488 - Continuity of Operations Plan

    Science.gov (United States)

    2012-07-25

    ...; Order No. 765] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION... Operations Plan to allow the Commission the discretion to better address not only long-term and catastrophic... discretion regarding: the activation and deactivation of the Continuity of Operations Plan and any suspension...

  20. Modeling and Control for Islanding Operation of Active Distribution Systems

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Wu, Qiuwei; Saleem, Arshad

    2011-01-01

    to stabilize the frequency. Different agents are defined to represent different resources in the distribution systems. A test platform with a real time digital simulator (RTDS), an OPen Connectivity (OPC) protocol server and the multi-agent based intelligent controller is established to test the proposed multi......Along with the increasing penetration of distributed generation (DG) in distribution systems, there are more resources for system operators to improve the operation and control of the whole system and enhance the reliability of electricity supply to customers. The distribution systems with DG...... are able to operate in is-landing operation mode intentionally or unintentionally. In order to smooth the transition from grid connected operation to islanding operation for distribution systems with DG, a multi-agent based controller is proposed to utilize different re-sources in the distribution systems...

  1. Notional Airspace Operations Demonstration Plan

    Science.gov (United States)

    Trongale, Nicholas A.

    2006-01-01

    The airspace operations demonstration (AOD) is intended to show that the Access 5 Step 1 functional requirements can be met. The demonstration will occur in two phases. The initial on-range phase will be carried out in restricted airspace to demonstrate the cooperative collision avoidance (CCA) functional requirements and to provide risk-reduction for the AOD by allowing the test team to rehearse some elements of the demonstration mission. The CCA system to be used in these flights is based on Automatic Dependent Surveillance-Broadcast (ADS-B) which is a commercially-available system by which airplanes constantly broadcast their current position and altitude to other aircraft and ground resources over a dedicated radio datalink. The final phase will occur in the national airspace (NAS) and will be the formal demonstration of the remainder of the proposed functional requirements. The general objectives of the AOD are as follows: (1) Demonstrate that the UAS can aviate in the NAS (2) Demonstrate that the UAS can navigate in the NAS (3) Demonstrate that the UAS can communicate with the NAS (4) Demonstrate that the UAS can perform selected collision avoidance functions in the NAS (5) Demonstrate that the UAS can evaluate and avoid weather conflicts in the NAS (6) Demonstrate that the UAS can provide adequate command and control in the NAS In addition to the stated objectives, there are a number of goals for the flight demonstration. The demo can be accomplished successfully without achieving these goals, but these goals are to be used as a guideline for preparing for the mission. The goals are: (1) Mission duration of at least 24 hours (2) Loiter over heavy traffic to evaluate the data block issue identified during the Access 5 Airspace Operations Simulations (3) Document the contingency management process and lessons learned (4) Document the coordination process for Ground Control Stations (GCS) handoff (5) Document lessons learned regarding the process of flying in

  2. Systemic Operational Design: Enhancing the Joint Operation Planning Process

    National Research Council Canada - National Science Library

    Delacruz, Victor J

    2007-01-01

    Operational level commanders and their staffs require relevant and current joint doctrine that articulates the critical function of operational design and its role in the Joint Operation Planning Process (JOPP...

  3. Recommendations for a barrier island breach management plan for Fire Island National Seashore, including the Otis Pike High Dune Wilderness Area, Long Island, New York

    Science.gov (United States)

    Williams, S. Jeffress; Foley, Mary K.

    2007-01-01

    The U.S Army Corps of Engineers, New York District is developing engineering plans, including economic costs and benefits, for storm damage reduction along an 83 mile stretch of the coastal barrier islands and beaches on the south shore of Long Island, NY from Fire Island Inlet east to the Montauk Point headland. The plan, expected to include various alternatives for storm protection and erosion mitigation, is referred to as the Fire Island to Montauk Point Reformulation Plan (FIMP). These plans are expected to follow the Corps of Engineers’ Environmental Operating Principles striving for long term environmental sustainability and balance between environmental protection and protection of human health and property. Fire Island National Seashore (FIIS), a 19,579 acre unit of the National Park System includes a 32 mile long coastal barrier island located within the FIMP project area. A seven-mile section of the park, Otis Pike Fire Island High Dune Wilderness Area, is also a designated Federal Wilderness Area. The FIIS includes not only the barrier island and sand dunes, but also several islands, sand flats and wetlands landward of the barrier, submerged parts of Great South Bay shoreface, extending approximately 4,000 feet into the bay with the inner shelf region extending approximately 1,000 feet seaward of the Fire Island shoreline. The Fire Island barrier islands, a sand-starved system dominated by highly dynamic processes, are struggling to maintain their integrity in the face of sea-level rise and storms. Adding to the dilemma is that development on the barriers and the mainland has increased greatly during the past 50 years. As such, managers and decision makers in federal agencies, state agencies and local governments are challenged to balance tradeoffs between protection of lives and property, public access and long term conservation of natural habitats and processes and the plants and animals that depend on these habitats. National Park Service (NPS

  4. 77 FR 41107 - Decommissioning Planning During Operations

    Science.gov (United States)

    2012-07-12

    ..., 40, 50, 70, and 72 [NRC-2011-0162] Decommissioning Planning During Operations AGENCY: Nuclear... (DG) 4014, ``Decommissioning Planning During Operations.'' This guide describes a method that the NRC staff considers acceptable for use in complying with the NRC's Decommissioning Planning Rule. The NRC...

  5. 76 FR 77431 - Decommissioning Planning During Operations

    Science.gov (United States)

    2011-12-13

    ... (DG) DG-4014, ``Decommissioning Planning During Operations.'' This guide describes a method that the.... The draft regulatory guide entitled, ``Decommissioning Planning During Operations,'' is temporarily..., 40, 50, 70, and 72 RIN 3150-AI55 [NRC-2011-0286; NRC-2008-0030] Decommissioning Planning During...

  6. 78 FR 663 - Decommissioning Planning During Operations

    Science.gov (United States)

    2013-01-04

    ...] Decommissioning Planning During Operations AGENCY: Nuclear Regulatory Commission. ACTION: Regulatory guide..., ``Decommissioning Planning During Operations.'' The guide describes a method that the NRC staff considers acceptable for use by holders of licenses in complying with the NRC's Decommissioning Planning Rule (DPR) (76 FR...

  7. Logistics planning and logistics planning factors for humanitarian operations

    OpenAIRE

    Sullivan, Donna Marie.

    1995-01-01

    Due to the increasing demand on the military to conduct humanitarian operations, the need for logistics planning factors that are applicable to these operations has arisen. This thesis develops a model for humanitarian operations and employs the model to develop logistics planning factors for material consumption and a computer-assisted planning aid relating to the support of the victim population. U.S. Navy (U.S.N.) author.

  8. Internal operating plan (P.O.I.)

    International Nuclear Information System (INIS)

    2002-01-01

    This article presents the POI (internal operating plan) which defines the management measures, the intervention methods and the required means that the operator must implement to protect the personnel, the population and the environment. (A.L.B.)

  9. Dealing with Uncertainty in Operational Transport Planning

    NARCIS (Netherlands)

    Zutt, J.; Van Gemund, A.J.C.; De Weerdt, M.M.; Witteveen, C.

    2010-01-01

    An important problem in transportation is how to ensure efficient operational route planning when several vehicles share a common road infrastructure with limited capacity. Examples of such a problem are route planning for automated guided vehicles in a terminal and route planning for aircraft

  10. Effective operational oil spill response planning

    International Nuclear Information System (INIS)

    Meyers, R.J.

    1991-01-01

    An operational Contingency Plan is one of the single most important aspects of effective oil spill response operations. It is a spill control game plan. A thorough contingency plan provides a set of guidelines that can be used to help direct all phases of spill response activities. More than simple a compilation of lists and rosters, the contingency plan reflects strategic and philosophical elements of spill response that help to ensure a viable response to any spill incident. Facilities and oil carrying vessels should have well maintained contingency plans with these features. This paper describes the requirement for effective oil spill response pans and the training required to exercise them

  11. Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-03-12

    This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e

  12. Early detection of power system disturbances as a condition for safe operation of the Dukovany NPP in the 'Island operation mode'

    International Nuclear Information System (INIS)

    Petruzela, I.

    1997-01-01

    The ''Frequency Plan'' worked out for the Czech Power System specifies a set of preventive measures along with the set of the frequency ranges. This problem was solved in details for the Dukovany nuclear power plant. The design changes under preparation support a reliable as well as safe operation in the island-operation mode until a full restoration of the whole power system. The design modifications are based on the following three main innovations: An incorporation of the FREA 16 frequency relay into the protection circuits; large modifications in turbine control loops; installation of software routine for the operator to support the island operation mode. The capability of the island operation has been demanded by relevant regulations both for the operating units and for that under construction. The capability can be tested under the transition to houseloads, as well as through the direct simulation of abnormal grid conditions. 1 fig

  13. Quayside Operations Planning Under Uncertainty

    DEFF Research Database (Denmark)

    Iris, Cagatay; Jin, Jian Gang; Lee, Der-Hong

    The quayside operation problem is one of the key components in the management system for a container terminal. This work focuses on three important problems that represent a bottleneck on terminal operations: Berth Allocation Problem (BAP), Quay Crane Assignment and Scheduling Problems (QCASP......).The state-of-art models mostly rely on forecasted, deterministic vessel arrivals, and they mostly assume that uniform QC operations is maintained. However, in reality, these parameters are mostly random. In this study, we present a stochastic programming approach based on a decomposition algorithm to solve...

  14. Operations planning simulation: Model study

    Science.gov (United States)

    1974-01-01

    The use of simulation modeling for the identification of system sensitivities to internal and external forces and variables is discussed. The technique provides a means of exploring alternate system procedures and processes, so that these alternatives may be considered on a mutually comparative basis permitting the selection of a mode or modes of operation which have potential advantages to the system user and the operator. These advantages are measurements is system efficiency are: (1) the ability to meet specific schedules for operations, mission or mission readiness requirements or performance standards and (2) to accomplish the objectives within cost effective limits.

  15. 78 FR 79312 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2013-12-30

    ... deviation from the operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow.... Army Rock Island Arsenal requested a temporary deviation for the Rock Island Railroad and Highway...

  16. 76 FR 9224 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2011-02-17

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation.... SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation for the Rock Island...

  17. Updating Rhode Island's strategic highway safety plan (SHSP).

    Science.gov (United States)

    2012-05-01

    This report summarizes the peer exchange sponsored by the Rhode Island : Department of Transportation (RIDOT) that focused on Rhode Islands SHSP : update. : Rhode Islands goals for the peer exchange included learning from other States : expe...

  18. Operating Plan and Guidelines (2011 - 2016)

    International Nuclear Information System (INIS)

    2011-01-01

    The Committee on Nuclear Regulatory Activities (CNRA) of the OECD Nuclear Energy Agency (NEA) is an international committee made up primarily of senior nuclear regulators. It was established in 1989 as a forum for the exchange of information and experience among regulatory organisations and for the review of developments which could affect regulatory requirements. The Committee is responsible for the programme of the NEA, concerning the regulation, licensing and inspection of nuclear installations. In particular, the Committee reviews current practices and operating experience. The Joint CSNI/CNRA Strategic Plan states that: The Operating Plan for each committee aligns with the Joint CNRA/ CSNI Strategic Plan. The Committee's Operating Plans describes each Committee's organisation, priorities, and operating procedures to be used in fulfilling their mandates in accordance with this strategic plan. Specific attention will be given to ensure that cross-cutting issues are satisfactorily dealt with. This report represents such an operating plan. The intention is that it should fit onto a new third rung on the ladder representing the hierarchy of documents that govern the work of CNRA. At the top of this hierarchy is the Strategic Plan of the NEA; immediately below that is the Joint CSNI/CNRA Strategic Plan; followed by the new operating plan and the guidelines for methods of work. This plan sets the basis for establishing the current CNRA Programme of Work. Since the issuance of the last plan in 2007 there has been a significant shift and many member countries are now constructing new facilities or in the process of legislative or technical processing for new licenses. This comes along in an atmosphere in which current operating plants requesting power up-rates, extended licenses, and substantial activity in new licensing and new construction. It is clear that all these activities require similar attention from the regulators and operators, and the responsibilities

  19. Hazardous waste operational plan for site 300

    International Nuclear Information System (INIS)

    Roberts, R.S.

    1982-01-01

    This plan outlines the procedures and operations used at LLNL's Site 300 for the management of the hazardous waste generated. This waste consists primarily of depleted uranium (a by-product of U-235 enrichment), beryllium, small quantities of analytical chemicals, industrial type waste such as solvents, cleaning acids, photographic chemicals, etc., and explosives. This plan details the operations generating this waste, the proper handling of this material and the procedures used to treat or dispose of the hazardous waste. A considerable amount of information found in this plan was extracted from the Site 300 Safety and Operational Manual written by Site 300 Facility personnel and the Hazards Control Department

  20. Operator/instrumentation interactions during the Three Mile Island incident

    International Nuclear Information System (INIS)

    Cummings, G.E.

    1979-10-01

    A discussion is presented of the operator/instrumentation interactions which had an effect on the course of the incident at the Three Mile Island-2 Nuclear Power Plant. A brief review of the sequence of occurrences at TMI-2 over the first 16 hours of the incident is given with particular emphasis on operator/instrumentation interactions. A breakdown of the six major items that seemed to have contributed to the characteristics of the incident is then given and also an outline of some of the currently proposed operator/instrumentation improvements. The six major items involve water level indication in the reactor, electromatic relief valve operation, auxiliary feed-water flow indication, containment isolation, extended range instrumentation, and computer readout

  1. Missouri commercial vehicle operations : state business plan

    Science.gov (United States)

    1998-05-15

    This business plan is intended to assist this state in improving its commercial vehicle operation regulation, guide the deployment and installation of intelligent transportation systems and to implement these systems in an efficient and cost effectiv...

  2. Airborne Data Link Operational Evaluation Test Plan

    Science.gov (United States)

    1993-08-01

    This plan describes an end-to-end study of operational concepts and procedures associated with the introduction of electronic data communications between flight crews and air traffic controllers. Full performance controllers from : terminal facilitie...

  3. Collaborative planning of operations in industrial symbiosis

    DEFF Research Database (Denmark)

    Herczeg, Gabor; Akkerman, Renzo

    2014-01-01

    Industrial symbiosis (IS) is cooperation between companies to achieve collective benefits by supplying and reusing industrial waste to substitute virgin resources in production. In this paper, we investigate the IS phenomenon from a supply chain management perspective. We propose a collaborative...... planning model to coordinate master planning of operations of waste suppliers and buyers. Furthermore, we analyze planning decisions related to IS when waste exchange is combined with virgin resource procurement. We demonstrate that conditions of virgin resource procurement affect the economic feasibility...

  4. 78 FR 21537 - Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2013-04-11

    ... Operation Regulations; Upper Mississippi River, Rock Island, IL AGENCY: Coast Guard, DHS. ACTION: Notice of... operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the Front Street 5K Run...

  5. 78 FR 69995 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2013-11-22

    ... Operation Regulation; Upper Mississippi River, Rock Island, IL AGENCY: Coast Guard, DHS. ACTION: Notice of... operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the bridge owner time...

  6. 75 FR 17561 - Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2010-04-07

    ... issued a temporary deviation from the regulation governing the operations of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, Mile 482.9, Rock Island, Illinois. The deviation is... Manager, Docket Operations, telephone (202) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island...

  7. 78 FR 18933 - Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2013-03-28

    ... operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the Quad City Marathon..., Docket Operations, telephone (202) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal...

  8. 75 FR 22228 - Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2010-04-28

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, Mile 482.9, Rock Island, Illinois. The deviation is... Manager, Docket Operations, telephone (202) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island...

  9. 75 FR 68974 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2010-11-10

    ..., has issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois... Operations, telephone 202-366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a...

  10. 78 FR 16411 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2013-03-15

    ... operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the Quad City Heart...-366-9826. [[Page 16412

  11. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  12. ICD Complex Operations and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  13. New heuristics for planning operating rooms.

    NARCIS (Netherlands)

    Molina-Pariente, J.M.; Hans, Elias W.; Framinan, J.M.; Gomez-Cia, T.

    2015-01-01

    We tackle the operating room planning problem of the Plastic Surgery and Major Burns Specialty of the University Hospital “Virgen del Rocio” in Seville (Spain). The decision problem is to assign an intervention date and an operating room to a set of surgeries on the waiting list, minimizing access

  14. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  15. Operations and maintenance plans for the TFTR

    International Nuclear Information System (INIS)

    Allen, H.L.; Fedor, B.J.

    1978-01-01

    Princeton University Plasma Physics Laboratory (PPPL) is constructing a Tokamak Fusion Test Reactor (TFTR) scheduled to begin operation for fusion research experiments in late 1981, first with hydrogen and deuterium plasmas and later, in the second phase, using tritium for high power fusion studies. This latter mode will introduce considerable complexity to operation and maintenance of the TFTR in terms of meeting requirements for tritium handling, adequate radiation shielding, and corrective and preventive maintenance procedures. In this paper we discuss plans for the installation and preoperational testing of the major subsystems of TFTR, proposed start-up and operating scenarios for the device and the system of operational control. In addition, the TFTR Maintenance Plan and related procedures for specific major maintenance tasks are described, including the use of remote handling equipment and remote manipulators. Each of these topics is addressed in terms of the current status of planning and development

  16. Microgrids and distributed generation systems: Control, operation, coordination and planning

    Science.gov (United States)

    Che, Liang

    Distributed Energy Resources (DERs) which include distributed generations (DGs), distributed energy storage systems, and adjustable loads are key components in microgrid operations. A microgrid is a small electric power system integrated with on-site DERs to serve all or some portion of the local load and connected to the utility grid through the point of common coupling (PCC). Microgrids can operate in both grid-connected mode and island mode. The structure and components of hierarchical control for a microgrid at Illinois Institute of Technology (IIT) are discussed and analyzed. Case studies would address the reliable and economic operation of IIT microgrid. The simulation results of IIT microgrid operation demonstrate that the hierarchical control and the coordination strategy of distributed energy resources (DERs) is an effective way of optimizing the economic operation and the reliability of microgrids. The benefits and challenges of DC microgrids are addressed with a DC model for the IIT microgrid. We presented the hierarchical control strategy including the primary, secondary, and tertiary controls for economic operation and the resilience of a DC microgrid. The simulation results verify that the proposed coordinated strategy is an effective way of ensuring the resilient response of DC microgrids to emergencies and optimizing their economic operation at steady state. The concept and prototype of a community microgrid that interconnecting multiple microgrids in a community are proposed. Two works are conducted. For the coordination, novel three-level hierarchical coordination strategy to coordinate the optimal power exchanges among neighboring microgrids is proposed. For the planning, a multi-microgrid interconnection planning framework using probabilistic minimal cut-set (MCS) based iterative methodology is proposed for enhancing the economic, resilience, and reliability signals in multi-microgrid operations. The implementation of high-reliability microgrids

  17. NIF Operations Management Plan, August 2011

    Energy Technology Data Exchange (ETDEWEB)

    Van Wonterghem, Bruno M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States). National Ignition Facility (NIF)

    2014-01-30

    Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in the laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the

  18. Real-Time Analysis of an Active Distribution Network - Coordinated Frequency Control for Islanding Operation

    DEFF Research Database (Denmark)

    Cha, Seung-Tae

    distribution networks makes it possible to operate the distribution networks independently which is called islanding operation. However, it is a challenge to ensure secure and reliable operation of the islanded system due to a num-ber of reasons, e.g. low inertia in the islanded system, intermittency of some...... of the DERs, etc. Particularly during islanding operation, with relatively few DG units, the frequency and voltage control of the islanded system is not straightforward. DG units, specially based on renewable energy sources (RESs), i.e. wind and solar, have an inter-mittent nature and intrinsic...... system (BESS) and two secondary frequency control scenarios with BESS and DG units. During the island-ing transition, the frequency is regulated by the fast-acting primary control of the BESS. The secondary control of the main management system (MMS) detects the status of the BESS and tries to return...

  19. 75 FR 81125 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2010-12-27

    ... Operation Regulation; Upper Mississippi River, Rock Island, IL AGENCY: Coast Guard, DHS. ACTION: Notice of... the Upper Mississippi River, mile 481.4, at Rock Island, Illinois. The deviation is necessary to allow... Rock Island, Illinois to open on signal if at least 24 hours advance notice is given for 44 days from...

  20. 77 FR 20716 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2012-04-06

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation...) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation...

  1. 77 FR 3607 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2012-01-25

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation...) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation...

  2. 76 FR 9223 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2011-02-17

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation...) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation...

  3. 77 FR 5398 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2012-02-03

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation...) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation...

  4. Island operation - modelling of a small hydro power system

    Energy Technology Data Exchange (ETDEWEB)

    Skarp, Stefan

    2000-02-01

    Simulation is a useful tool for investigating a system behaviour. It is a way to examine operating situations without having to perform them in reality. If someone for example wants to test an operating situation where the system possibly will demolish, a computer simulation could be a both cheaper and safer way than to do the test in reality. This master thesis performs and analyses a simulation, modelling an electronic power system. The system consists of a minor hydro power station, a wood refining industry, and interconnecting power system components. In the simulation situation the system works in a so called island operation. The thesis aims at making a capacity analysis of the current system. Above all, the goal is to find restrictions in load power profile of the consumer, under given circumstances. The computer software used in simulations is Matlab and its additional program PSB (Power System Blockset). The work has been carried out in co-operation with the power supplier Skellefteaa Kraft, where the problem formulation of this master thesis was founded.

  5. Interactive orbital proximity operations planning system

    Science.gov (United States)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1990-01-01

    An interactive graphical planning system for on-site planning of proximity operations in the congested multispacecraft environment about the space station is presented. The system shows the astronaut a bird's eye perspective of the space station, the orbital plane, and the co-orbiting spacecraft. The system operates in two operational modes: (1) a viewpoint mode, in which the astronaut is able to move the viewpoint around in the orbital plane to range in on areas of interest; and (2) a trajectory design mode, in which the trajectory is planned. Trajectory design involves the composition of a set of waypoints which result in a fuel-optimal trajectory which satisfies all operational constraints, such as departure and arrival constraints, plume impingement constraints, and structural constraints. The main purpose of the system is to present the trajectory and the constraints in an easily interpretable graphical format. Through a graphical interactive process, the trajectory waypoints are edited until all operational constraints are satisfied. A series of experiments was conducted to evaluate the system. Eight airline pilots with no prior background in orbital mechanics participated in the experiments. Subject training included a stand-alone training session of about 6 hours duration, in which the subjects became familiar with orbital mechanics concepts and performed a series of exercises to familiarize themselves with the control and display features of the system. They then carried out a series of production runs in which 90 different trajectory design situations were randomly addressed. The purpose of these experiments was to investigate how the planning time, planning efforts, and fuel expenditures were affected by the planning difficulty. Some results of these experiments are presented.

  6. Spent Nuclear Fuel Project operational staffing plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1996-03-01

    Using the Spent Nuclear Fuel (SNF) Project's current process flow concepts and knowledge from cognizant engineering and operational personnel, an initial assessment of the SNF Project radiological exposure and resource requirements was completed. A small project team completed a step by step analysis of fuel movement in the K Basins to the new interim storage location, the Canister Storage Building (CSB). This analysis looked at fuel retrieval, conditioning of the fuel, and transportation of the fuel. This plan describes the staffing structure for fuel processing, fuel movement, and the maintenance and operation (M ampersand O) staffing requirements of the facilities. This initial draft does not identify the support function resources required for M ampersand O, i.e., administrative and engineering (technical support). These will be included in future revisions to the plan. This plan looks at the resource requirements for the SNF subprojects, specifically, the operations of the facilities, balances resources where applicable, rotates crews where applicable, and attempts to use individuals in multi-task assignments. This plan does not apply to the construction phase of planned projects that affect staffing levels of K Basins

  7. Planning, Management, and Economics of Airport Operation

    Science.gov (United States)

    Wiley, J.

    1972-01-01

    An overview of the role of the airport in the transportation complex and in the community is presented. The establishment of the airport including its requirements in regional planning and the operation of the airport as a social and economic force are discussed.

  8. Electric Vehicle Sharing Planning and Operations

    Science.gov (United States)

    2018-02-01

    Dongfang Zhao (ORCID ID 0000-0002-5424-9915); Xiaopeng (Shaw) Li (ORCID ID 0000-0002-5264-3775); Yu Zhang (ORCID ID 0000-0003-1202-626X) This project includes literature review and proposing a model for EV planning and operations. We first conducted ...

  9. Kennedy Space Center Orion Processing Team Planning for Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis

  10. 30 CFR 780.13 - Operation plan: Blasting.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Blasting. 780.13 Section 780.13... SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.13 Operation plan: Blasting. (a) Blasting plan. Each application shall contain a blasting plan for the proposed...

  11. Study on a New Operational Mode of Economic Operation of Islanded Microgrids Using Electric Springs

    Directory of Open Access Journals (Sweden)

    Zhao Zhiyu

    2018-01-01

    Full Text Available With the increasing penetration of intermittent renewable energy sources (RESs into microgrids, the original operation mode of power generation determined by load demand faces severe challenges due to the uncertainties of the RESs power output. The electric springs(ESs, as an emerging technology has been verified to be effective in enabling load demand to follow power generation and stabilizing fluctuation of RESs output. This paper presents a new mode of economic operation for island microgrids including non-critical loads with embedded electric springs. Its connotation includes that i the capacity of energy storage can be reduced through the interaction of the energy storage system (ESS and the electric springs, ii the electric springs reduce the stress of peak load regulation and operational cost and iii the demand of microgrids system for ramping ability of generation units is reduced with the buffer of the electric springs. Numerical results show that the coordinated operation between electric springs and energy storage system of microgrids can bring down the investment cost for the ESS and short-term operational cost in the aspect of economic dispatch, reducing requirements for the capacity and ramp ability of the energy storage system in microgrids. Energy buffering can be achieved with lower cost and the load demand can follow power generation in the new operational mode of islanded microgrids using electric springs.

  12. Emergency planning and preparedness: pre- and post-Three Mile Island

    International Nuclear Information System (INIS)

    Collins, H.E.

    1980-01-01

    The problems of radiological emergency response planning revealed by the Three-Mile Island nuclear power plant accident, are discussed. The most pressing problems are the need for an adequate planning basis, the improvement of accident assessment, the improvement and development of training programs, the need for adequate fundina and the development of emergency planning auidance. (H.K.)

  13. Long Island Transportation Plan to Manage Congestion: Framework for Developing and Evaluating Improvement Strategies

    Science.gov (United States)

    2002-04-20

    The Long Island Transportation Plan to Manage Congestion (LITP 2000) will establish an integrated, multi-modal transportation program of cost-effective strategies to manage congestion and improve the movement of people and goods in Nassau and Suffolk...

  14. Professional operation and management of nuclear island installation

    International Nuclear Information System (INIS)

    Ma Limin

    2011-01-01

    As an important part of nuclear power plant construction, nuclear island installation mainly involves main equipment installation, pipeline installation, associated procedure examination and other important tasks. However, due to the nuclear island installation management changing from single project to multi-projects, the problems such as professional management of nuclear island installation and the lack of technical staff become more and more prominent and become one of the key restricts to the work of nuclear island installation. Based on analysis of the single project, single-base nuclear island installation management and practice, combined with the current situation that multi-project and multi-base construction of nuclear power are carrying out at the same time, this paper proposes a new management model of nuclear island installation. (author)

  15. 78 FR 56607 - Drawbridge Operation Regulation; Hudson River, Troy and Green Island, NY

    Science.gov (United States)

    2013-09-13

    ...-AA09 Drawbridge Operation Regulation; Hudson River, Troy and Green Island, NY AGENCY: Coast Guard, DHS... operation of the highway bridge across the Hudson River, mile 152.7, between Troy and Green Island, New York... Street Bridge, mile 155.4, between Troy and Cohoes which has been converted to a fixed bridge. It is...

  16. Optimal Bidding of a Microgrid Based on Probabilistic Analysis of Island Operation

    Directory of Open Access Journals (Sweden)

    Siyoung Lee

    2016-10-01

    Full Text Available Island operation of a microgrid increases operation survivability and reliability when there is a large accident in a main grid. However, because a microgrid typically has limited generation capability, a microgrid operator (MGO has to take the risk of island operation into account in its market participation and generation scheduling to ensure efficient operation. In this paper, a microgrid islanding event is interpreted as a trade suspension of a contract, and a set of islanding rules is presented in the form of a market rule. The risk of island operation is evaluated by modeling the microgrid islanding stochastically using an islanding probability function, which is defined in the form of a conditional probability to reflect the influence of outside conditions. An optimal bidding strategy is obtained for the MGO by formulating and solving an optimization problem to minimize the expected operating cost. The effectiveness of the proposed method was investigated by numerical simulations in which the proposed method and two other methods were applied to the same microgrid. Numerical sensitivity analyses of the coefficients of the islanding probability function were conducted to determine how an MGO copes with changes in outside conditions.

  17. Multi-agent based controller for islanding operation of active distribution networks with distributed generation

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Wu, Qiuwei; Østergaard, Jacob

    2011-01-01

    -bus system was used to investigate the dynamic and steady state performance of the active distribution system during islanding operation. Case studies have been carried out using the Real-Time Digital Simulator (RTDS) based simulation platform. Case study results show that the proposed multi......The increasing amount of distributed generation (DG) in today’s highly complex restructured power networks gives more options for distribution system operators (DSOs) under contingency conditions. A low voltage distribution network with a large amount of DG can be operated as an islanded system...... if the distribution system is disconnected from the main grid due to the contingency. In order to successfully operate distribution systems under islanding mode, the possibility of small power islands within the distribution system needs to be considered. The control and management of these small power islands...

  18. Double Star project - master science operations plan

    Science.gov (United States)

    Shen, C.; Liu, Z.

    2005-11-01

    For Double Star Project (DSP) exploration, the scientific operations are very important and essential for achieving its scientific objectives. Two years before the launch of the DSP satellites (TC-1 and TC-2) and during the mission operating phase, the long-term and short-term master science operations plans (MSOP) were produced. MSOP is composed of the operation schedules of all the scientific instruments, the modes and timelines of the Payload Service System on TC-1 and TC-2, and the data receiving schedules of the three ground stations. The MSOP of TC-1 and TC-2 have been generated according to the scientific objectives of DSP, the orbits of DSP, the near-Earth space environments and the coordination with Cluster, etc., so as to make full use of the exploration resources provided by DSP and to acquire as much quality scientific data as possible for the scientific communities. This paper has summarized the observation resources of DSP, the states of DSP and its evolution since the launch, the strategies and rules followed for operating the payload and utilizing the ground stations, and the production of MSOP. Until now, the generation and execution of MSOP is smooth and successful, the operating of DSP is satisfactory, and most of the scientific objectives of DSP have been fulfilled.

  19. Double Star project - master science operations plan

    Directory of Open Access Journals (Sweden)

    C. Shen

    2005-11-01

    Full Text Available For Double Star Project (DSP exploration, the scientific operations are very important and essential for achieving its scientific objectives. Two years before the launch of the DSP satellites (TC-1 and TC-2 and during the mission operating phase, the long-term and short-term master science operations plans (MSOP were produced. MSOP is composed of the operation schedules of all the scientific instruments, the modes and timelines of the Payload Service System on TC-1 and TC-2, and the data receiving schedules of the three ground stations. The MSOP of TC-1 and TC-2 have been generated according to the scientific objectives of DSP, the orbits of DSP, the near-Earth space environments and the coordination with Cluster, etc., so as to make full use of the exploration resources provided by DSP and to acquire as much quality scientific data as possible for the scientific communities. This paper has summarized the observation resources of DSP, the states of DSP and its evolution since the launch, the strategies and rules followed for operating the payload and utilizing the ground stations, and the production of MSOP. Until now, the generation and execution of MSOP is smooth and successful, the operating of DSP is satisfactory, and most of the scientific objectives of DSP have been fulfilled.

  20. 14 CFR 380.33a - Operator's option plan.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Operator's option plan. 380.33a Section 380... option plan. (a) For the purposes of this part, an operator's option plan contract that states... flight leg. (b) Operator's option plan contracts shall state, in addition to the information required by...

  1. 30 CFR 784.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Existing structures. 784.12... PLAN § 784.12 Operation plan: Existing structures. (a) Each application shall contain a description of... and reclamation operation. The description shall include: (1) Location; (2) Plans of the structure...

  2. 30 CFR 780.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Existing structures. 780.12... PLAN § 780.12 Operation plan: Existing structures. (a) Each application shall contain a description of... and reclamation operation. The description shall include— (1) Location; (2) Plans of the structure...

  3. 14 CFR 136.13 - Helicopter performance plan and operations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Helicopter performance plan and operations... Helicopter performance plan and operations. (a) Each operator must complete a performance plan before each helicopter commercial air tour, or flight operated under 14 CFR 91.146 or 91.147. The pilot in command must...

  4. Nuclear power planning study for Indonesia (Java Island)

    International Nuclear Information System (INIS)

    1976-01-01

    The major objective of the study is to determine the optimum timing and size of nuclear size of nuclear power plants that could be built on Java Island during the period 1978-1997. The study could also be considered as a general survey of the available energy resources in the country. Included are economic background, rational energy resources, electricity supply system on Java Island, forecast of electric energy demand, methodology and basis for evaluation, frequency stability analysis and results of analysis. In 8 appendixes technical, economic and financial aspects of the demand for electrical energy are discussed

  5. How Will Teachers Fare in Rhode Island's New Hybrid Pension Plan? Public Pension Project Brief 4

    Science.gov (United States)

    Johnson, Richard W.; Butrica, Barbara A.; Haaga, Owen; Southgate, Benjamin G.

    2014-01-01

    Hybrid retirement plans that combine defined benefit pensions with 401(k) type, defined contribution accounts can play important roles in the reform of public-sector pensions. Summarizing results from our longer report ["How Will Rhode Island's New Hybrid Pension Plan Affect Teachers? A Report of the Public Pension Project" (2014)], this…

  6. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  7. ARCHITECTURAL AND TOWN-PLANNING LEARNING OF THE ISLANDS AT THE DNIEPER RIFTS

    Directory of Open Access Journals (Sweden)

    VOROBYOV V. V.

    2016-06-01

    Full Text Available Abstract. Problem Statement. The problem of architectural-town-planning learning of the river Islands in large rivers of the country has a convoluted history, which has radically changed the attitude of people to such areas of land many times. The modern stage of society development and urban development has again raised the issue of the revision the attitude to the Islands in reservoirs, including in the area of the Dnieper rapids, featuring the unique properties of biopositive impact on all the kinds of living organisms. The material embodiment of a new approach involving Islands in the program "Ekopolis "Iriy-Sad" on the Dnieper rapids", architectural and urban aspects of which are being developed since 2008 at the Department of architectural design under the direction of V. V. Vorobyova [ ]. However, articles of various authors on island territories, have not proposed the right approaches yet, which let us look at underrapid island on the Dnieper from the position of the new requirements of the times, which determined by the topicality of this article. The analysis of publications on the environmental aspects of architecture, urban planning and landscape design for the conditions of the river Islands between Dnipropetrovsk and Kiev, showed the absence of theoretical developments and practical recommendations, taking into account their natural and anthropogenic potential in the framework of solving the task of ecologization of the Dnieper valley and the transition to the latest technology organization of space for human life. The purpose of the article is to reveal the potential of the Islands in the area of the Dnieper rapids and the ways of its applying in architecture, urban planning and landscape design. Conclusions. Modern approaches to urban and architectural applying of river Islands do not take into account the fullness of the structural organization of the matrix of the ecosystem (exchange relationships, organized in the form of net

  8. Control strategies for gas turbine generators for grid connected and islanding operations

    DEFF Research Database (Denmark)

    Mahat, Pukar; Chen, Zhe; Bak-Jensen, Birgitte

    2010-01-01

    fine while a DG is connected to a grid, might not work as desired while it is islanded and vise versa. This paper presents a strategy to operate distribution systems with a small gas turbine generator (GTG), which is capable of supplying local loads, in both islanding and grid connected conditions...

  9. 77 FR 22217 - Drawbridge Operation Regulation; Oregon Slough, Hayden Island, OR

    Science.gov (United States)

    2012-04-13

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2012-0290] Drawbridge Operation Regulation; Oregon Slough, Hayden Island, OR AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., at Hayden Island, OR. This deviation is necessary to accommodate maintenance of the train signaling...

  10. 78 FR 31454 - Drawbridge Operation Regulation; Hudson River, Troy and Green Island, NY

    Science.gov (United States)

    2013-05-24

    ...-AA09 Drawbridge Operation Regulation; Hudson River, Troy and Green Island, NY AGENCY: Coast Guard, DHS... that governs the highway bridge (Troy Green Island) across the Hudson River, mile 152.7, between Troy... the regulations for the 112th Street Bridge, mile 155.4, between Troy and Cohoes which has been...

  11. KSC ground operations planning for Space Station

    Science.gov (United States)

    Lyon, J. R.; Revesz, W., Jr.

    1993-01-01

    At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.

  12. Sustainable energy planning for 27 small Danish Islands. Summary report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    A methodology has been developed and implemented, whereby detailed assessment of a few model or archetype islands may be used as basis for subsequent estimation of possibilities for other islands of similar kind, provided certain key data for present day energy consumption are available. A consistent interaction with the population on the model islands has been important in that process. The technical-economical results of the study show, that a number of measures seem cost-effective with the aim of contributing to a sustainable energy supply for the small Danish islands. Most prominent are energy savings for both heat and electricity, grid connected wind turbines for electricity production and collective heat supply, in decreasing order of cost-effectiveness. It has become clear, that an organisational structure based on the cooperative idea is essential for realising this potential. In Denmark this is a strong tradition, recently manifesting itself in the fact, that a majority of Danish wind turbines have been installed in the fram work of cooperative idea is essential for realising this potential. In Denmark this is a strong tradition, recently manifesting itself in the fact, that a majority of Danish wind turbines have been installed in the framework of cooperatives. This means that it is a well proven concept, in Denmark well established in the legal and financial structure including the tax laws. Consequently such energy cooperatives represent the organisational structure recommended by the project also for other sustainable energy initiatives on the small Danish islands. The implication on a European level is that the methodology developed in the project, as well as the concrete recommendations of the project including organisational structures, seem well suited to be applied on a European level in the context of local communities with a strong identity. (LN)

  13. Planning and Estimation of Operations Support Requirements

    Science.gov (United States)

    Newhouse, Marilyn E.; Barley, Bryan; Bacskay, Allen; Clardy, Dennon

    2010-01-01

    Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D

  14. 77 FR 14047 - Guidance for Decommissioning Planning During Operations

    Science.gov (United States)

    2012-03-08

    ...)-4014, ``Decommissioning Planning During Operations.'' This action is necessary to correct the NRC's... NUCLEAR REGULATORY COMMISSION [NRC-2011-0286] Guidance for Decommissioning Planning During Operations AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; correction. SUMMARY: The U...

  15. 7 CFR 1466.9 - EQIP plan of operations.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false EQIP plan of operations. 1466.9 Section 1466.9... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS ENVIRONMENTAL QUALITY INCENTIVES PROGRAM General Provisions § 1466.9 EQIP plan of operations. (a) All conservation practices in the EQIP plan of...

  16. 77 FR 8751 - Guidance for Decommissioning Planning During Operations

    Science.gov (United States)

    2012-02-15

    ..., 40, 50, 70, and 72 [NRC-2011-0286] Guidance for Decommissioning Planning During Operations AGENCY... Guide, DG-4014, ``Decommissioning Planning During Operations'' in the Federal Register with a public... Guide DG-4014, ``Decommissioning Planning During Operations.'' This DG refers to NUREG-1757 Volume 3...

  17. 30 CFR 784.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 784.11... PLAN § 784.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  18. 30 CFR 780.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 780.11... PLAN § 780.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  19. Automated transit planning, operation, and applications

    CERN Document Server

    Liu, Rongfang

    2016-01-01

    This book analyzes the successful implementations of automated transit in various international locations, such as Paris, Toronto, London, and Kuala Lumpur, and investigates the apparent lack of automated transit applications in the urban environment in the United States. The book begins with a brief definition of automated transit and its historical development. After a thorough description of the technical specifications, the author highlights a few applications from each sub-group of the automated transit spectrum. International case studies display various technologies and their applications, and identify vital factors that affect each system and performance evaluations of existing applications. The book then discusses the planning and operation of automated transit applications at both macro and micro levels. Finally, the book covers a number of less successful concepts, as well as the lessons learned, allow ng readers to gain a comprehensive understanding of the topic.

  20. National volcanic ash operations plan for aviation

    Science.gov (United States)

    ,; ,

    2007-01-01

    The National Aviation Weather Program Strategic Plan (1997) and the National Aviation Weather Initiatives (1999) both identified volcanic ash as a high-priority informational need to aviation services. The risk to aviation from airborne volcanic ash is known and includes degraded engine performance (including flameout), loss of visibility, failure of critical navigational and operational instruments, and, in the worse case, loss of life. The immediate costs for aircraft encountering a dense plume are potentially major—damages up to $80 million have occurred to a single aircraft. Aircraft encountering less dense volcanic ash clouds can incur longer-term costs due to increased maintenance of engines and external surfaces. The overall goal, as stated in the Initiatives, is to eliminate encounters with ash that could degrade the in-flight safety of aircrews and passengers and cause damage to the aircraft. This goal can be accomplished by improving the ability to detect, track, and forecast hazardous ash clouds and to provide adequate warnings to the aviation community on the present and future location of the cloud. To reach this goal, the National Aviation Weather Program established three objectives: (1) prevention of accidental encounters with hazardous clouds; (2) reduction of air traffic delays, diversions, or evasive actions when hazardous clouds are present; and (3) the development of a single, worldwide standard for exchange of information on airborne hazardous materials. To that end, over the last several years, based on numerous documents (including an OFCMsponsored comprehensive study on aviation training and an update of Aviation Weather Programs/Projects), user forums, and two International Conferences on Volcanic Ash and Aviation Safety (1992 and 2004), the Working Group for Volcanic Ash (WG/VA), under the OFCM-sponsored Committee for Aviation Services and Research, developed the National Volcanic Ash Operations Plan for Aviation and Support of the

  1. Planning for climate change in small islands: insights from national hurricane preparedness in the Cayman Islands

    International Nuclear Information System (INIS)

    Tompkins, E.L.

    2005-01-01

    This paper examines contemporary national scale responses to tropical storm risk in a small island in the Caribbean to derive lessons for adapting to climate change. There is little empirical evidence to guide national planners on how to adapt to climate change, and less still on how to build on past adaptation experiences. The paper investigates the construction of institutional resilience and the process of adaptation to tropical storm risk by the Cayman Islands' Government from 1988 to 2002. It explains the roles of persuasion, exposure and collective action as key components in developing the ability to buffer external disturbance using models of institutional economics and social resilience concepts. The study finds that self-efficacy, strong local and international support networks, combined with a willingness to act collectively and to learn from mistakes appear to have increased the resilience of the Cayman Islands' Government to tropical storm risk. The lessons learned from building resilience to storm risk can contribute to the creation of national level adaptive capacity to climate change, but climate change has to be prioritised before these lessons can be transferred. (author)

  2. Planning for climate change in small islands: insights from national hurricane preparedness in the Cayman Islands

    Energy Technology Data Exchange (ETDEWEB)

    Tompkins, E.L. [University of East Anglia, Norwich (United Kingdom). School of Environmental Sciences

    2005-07-01

    This paper examines contemporary national scale responses to tropical storm risk in a small island in the Caribbean to derive lessons for adapting to climate change. There is little empirical evidence to guide national planners on how to adapt to climate change, and less still on how to build on past adaptation experiences. The paper investigates the construction of institutional resilience and the process of adaptation to tropical storm risk by the Cayman Islands' Government from 1988 to 2002. It explains the roles of persuasion, exposure and collective action as key components in developing the ability to buffer external disturbance using models of institutional economics and social resilience concepts. The study finds that self-efficacy, strong local and international support networks, combined with a willingness to act collectively and to learn from mistakes appear to have increased the resilience of the Cayman Islands' Government to tropical storm risk. The lessons learned from building resilience to storm risk can contribute to the creation of national level adaptive capacity to climate change, but climate change has to be prioritised before these lessons can be transferred. (author)

  3. Programmatic changes due to TMI-2 [Three Mile Island Unit 2]: Accident planning

    International Nuclear Information System (INIS)

    Wingert, V.L.

    1988-01-01

    The focus of the paper is lessons learned for emergency planning and preparedness form the Three Mile Island Unit 2 (TMI-2) accident. The lessons learned are examined from two perspectives: (a) lessons learned that have resulted in programmatic changes, and (b) lessons learned that have not been adequately addressed. There is no doubt that the TMI-2 accident is the pivotal event that caused a major rethinking of the pre-TMI emergency preparedness posture and led to a fundamentally different approach to emergency preparedness for commercial nuclear power plant accidents. While this new approach has evolved into a comprehensive, systematic, and even prototypical national program, it has also generated new problems: escalating costs for state and local governments and leveraging of the federal licensing process by state and local governments who do not want specific nuclear power plants to operate. A discussion of the primary lessons learned on emergency preparedness is presented under the following topics: beyond defense-in-depth, predetermined action, mandatory emergency planning and preparedness, and federal coordination

  4. Operator-assisted planning and execution of proximity operations subject to operational constraints

    Science.gov (United States)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1991-01-01

    Future multi-vehicle operations will involve multiple scenarios that will require a planning tool for the rapid, interactive creation of fuel-efficient trajectories. The planning process must deal with higher-order, non-linear processes involving dynamics that are often counter-intuitive. The optimization of resulting trajectories can be difficult to envision. An interaction proximity operations planning system is being developed to provide the operator with easily interpreted visual feedback of trajectories and constraints. This system is hosted on an IRIS 4D graphics platform and utilizes the Clohessy-Wiltshire equations. An inverse dynamics algorithm is used to remove non-linearities while the trajectory maneuvers are decoupled and separated in a geometric spreadsheet. The operator has direct control of the position and time of trajectory waypoints to achieve the desired end conditions. Graphics provide the operator with visualization of satisfying operational constraints such as structural clearance, plume impingement, approach velocity limits, and arrival or departure corridors. Primer vector theory is combined with graphical presentation to improve operator understanding of suggested automated system solutions and to allow the operator to review, edit, or provide corrective action to the trajectory plan.

  5. Reimaanlok: A National Framework for Conservation Area Planning in the Marshall Islands

    Directory of Open Access Journals (Sweden)

    Nicole Baker

    2011-01-01

    Full Text Available The development of Reimaanlok, a national framework for the planning and establishment of community-based conservation areas in the Marshall Islands, is outlined. A team composed of international experts and local resource management professionals selected and modified an ecoregional planning approach, defined key concepts, selected conservation features and targets, compiled biogeographical information from scientific and local knowledge and carried out a national-level ecological gap assessment. Past development of community-based fisheries and conservation plans was reviewed and the lessons learned informed the development of a robust community-based planning process for the design and establishment of conservation areas on individual atolls, integrating ecosystem based management (EBM theory, traditional knowledge and management, and the particular socio-economic needs of island communities. While specific geographic, historical, cultural and economic characteristics of the Marshall Islands have created a framework that is unique, several aspects of this process offer ideas for national strategic conservation planning in other Small Island Developing States where there is a paucity of scientific data, significant and increasing threats, and where decision-making about the use of natural resources occurs primarily at the local level.

  6. Planning renewable energy systems as part of Cradle-to-Cradle thinking on islands

    DEFF Research Database (Denmark)

    Smink, Carla; Hong, Lixuan; Kerndrup, Søren

    In a recently started EU Interreg IVB project ‘Cradle to Cradle Islands’, the cradle-to-cradle concept is going to be applied to a number of islands in the North Sea region, aiming at 100% renewable energy supply. The transformation of island energy systems is a challenging task, although islands...... and applies simple energy planning tools specific for each island, which are then used to start discussions on the islands on the pros and cons of renewable energy development, by providing information and real choices, and by starting social learning processes....... such as Samsø in Denmark have shown the way. While technologies exist and are readily available on the market to produce electricity and heat and to provide mobility, the difficulties typically lie in creating the institutional, economical and regulatory settings to make people and companies invest...... in these technologies. The specific challenge for islands is their dependence on energy supply from the mainland. Also, on most islands there are competing land uses for renewable energy from wind or biomass production. Areas are more sensitive and tourism and nature conservation often prohibits the development...

  7. Commonwealth of the Northern Mariana Islands Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes various energy strategies available to CNMI to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption. The information presented in this strategic energy plan will be used by the CNMI Governor's Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, and expanding the use of a range of energy technologies, including renewable electricity production and buildings energy efficiency and conservation.

  8. NASA deep space network operations planning and preparation

    Science.gov (United States)

    Jensen, W. N.

    1982-01-01

    The responsibilities and structural organization of the Operations Planning Group of NASA Deep Space Network (DSN) Operations are outlined. The Operations Planning group establishes an early interface with a user's planning organization to educate the user on DSN capabilities and limitations for deep space tracking support. A team of one or two individuals works through all phases of the spacecraft launch and also provides planning and preparation for specific events such as planetary encounters. Coordinating interface is also provided for nonflight projects such as radio astronomy and VLBI experiments. The group is divided into a Long Range Support Planning element and a Near Term Operations Coordination element.

  9. Emergy Evaluation of Dwelling Operation in Five Housing Units of Montreal Island, Canada

    Directory of Open Access Journals (Sweden)

    Ricardo Enrique Vega-Azamar

    2017-04-01

    Full Text Available Sustainability of cities and the environmental implications of high resource utilization by the domestic sector are growing concerns related to urban regions. Well-informed urban planning decision-making is an essential tool to help in the task and, for that, an important point to consider is the influence of parameters like residential density and housing typology on the intensity of resource utilization. Emergy synthesis, a life-cycle energy analysis methodological approach that considers the interaction of natural and human-made flows, was used to evaluate the environmental support for dwelling operational stage in five typical present-day housing units on the island of Montreal. As expected, resource utilization, measured as total emergy used, was positively correlated to housing unit size both with respect to number of occupants and dwelling size. Results suggest that variables affecting notably the intensity of resource utilization are per household income and per dweller habitable space and, while a higher income increased per capita emergy in all cases, increasing space availability per resident did not result in a decrease of empower density after 50 m2/person. Future work should consider lower and higher densities and analyses at the scale of blocks, neighborhoods and urban planning zones.

  10. Designing an Energy Storage System Fuzzy PID Controller for Microgrid Islanded Operation

    OpenAIRE

    Jong-Yul Kim; Hak-Man Kim; Seul-Ki Kim; Jin-Hong Jeon; Heung-Kwan Choi

    2011-01-01

    Recently, interest in microgrids, which are composed of distributed generation (DG), distributed storage (DS), and loads, has been growing as a potentially effective clean energy system to mitigate against climate change. The microgrid is operated in the grid-connected mode and the islanded mode according to the conditions of the upstream power grid. The role of the energy storage system (ESS) is especially important to maintain constant the frequency and voltage of an islanded microgrid. For...

  11. Commonwealth of the Northern Mariana Islands Energy Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

  12. 7 CFR 1465.6 - AMA plan of operations.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false AMA plan of operations. 1465.6 Section 1465.6... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS AGRICULTURAL MANAGEMENT ASSISTANCE General Provisions § 1465.6 AMA plan of operations. (a) All conservation practices in the APO must be approved by...

  13. A distributed planning concept for Space Station payload operations

    Science.gov (United States)

    Hagopian, Jeff; Maxwell, Theresa; Reed, Tracey

    1994-01-01

    The complex and diverse nature of the payload operations to be performed on the Space Station requires a robust and flexible planning approach. The planning approach for Space Station payload operations must support the phased development of the Space Station, as well as the geographically distributed users of the Space Station. To date, the planning approach for manned operations in space has been one of centralized planning to the n-th degree of detail. This approach, while valid for short duration flights, incurs high operations costs and is not conducive to long duration Space Station operations. The Space Station payload operations planning concept must reduce operations costs, accommodate phased station development, support distributed users, and provide flexibility. One way to meet these objectives is to distribute the planning functions across a hierarchy of payload planning organizations based on their particular needs and expertise. This paper presents a planning concept which satisfies all phases of the development of the Space Station (manned Shuttle flights, unmanned Station operations, and permanent manned operations), and the migration from centralized to distributed planning functions. Identified in this paper are the payload planning functions which can be distributed and the process by which these functions are performed.

  14. Spent Nuclear Fuel (SNF) Startup Plan to Operations

    International Nuclear Information System (INIS)

    GREGORY, J.R.

    2000-01-01

    This plan defines the approach that will be used to ensure the transition from initial startup to normal operations of the SNF operations--are performed in a safe, controlled, and deliberate manner. It provides a phased approach that bridges the operations between the completion of the ORR and the return to normal operations. This plan includes management oversight and administrative controls to be implemented and then reduced in a controlled manner until normal operations are authorized by SNF Management

  15. Methods for improving power system security by certifying dynamic stability in island operation

    Energy Technology Data Exchange (ETDEWEB)

    Granfors, S.; Krantz, N. [Solvina, Goteborg (Sweden)

    2007-07-01

    In response to concerns regarding the vulnerability of power systems around the world to major blackouts, a study was conducted to test island operation capability at power plants. Island operation refers to cases where one or more generators are connected to a limited power grid where there is no external voltage or frequency reference. In island operation, each generator is large enough to have a significant impact on the frequency and voltage in the grid. The ability to operate an isolated island grid can be beneficial for industries or hospitals, as well as for different rural areas. This study identified control parameters and evaluated power plant processes through step responses and frequency analysis. A hardware-in-the-loop (HWIL) simulation technique was proposed for island operation/power restoration testing. The proposed method made it possible to perform safe field studies of power stations that were synchronized to the main grid. More than 40 frequency control tests were conducted on different kinds of power plants in Sweden during normal operation. Most errors were found to be caused by improper operation and unstable conditions. Nearly all machines were stabilized after tuning. It was shown that newly built, identically designed and tuned turbines behave differently due to individual components. This paper addressed issues such as mechanical backlash, unsatisfying calibration of measuring equipment and improper tuning of controllers. In order to tune and optimize frequency control the choice of control algorithm is critical. Several different implementations were used during the tests, but the most successful was based on a separate control mode for island operation including gate-opening feedback for calculating droop. 4 refs., 8 figs.

  16. Operational Plan Ontology Model for Interconnection and Interoperability

    Science.gov (United States)

    Long, F.; Sun, Y. K.; Shi, H. Q.

    2017-03-01

    Aiming at the assistant decision-making system’s bottleneck of processing the operational plan data and information, this paper starts from the analysis of the problem of traditional expression and the technical advantage of ontology, and then it defines the elements of the operational plan ontology model and determines the basis of construction. Later, it builds up a semi-knowledge-level operational plan ontology model. Finally, it probes into the operational plan expression based on the operational plan ontology model and the usage of the application software. Thus, this paper has the theoretical significance and application value in the improvement of interconnection and interoperability of the operational plan among assistant decision-making systems.

  17. Selection, training, qualification and licensing of Three Mile Island reactor operating personnel

    International Nuclear Information System (INIS)

    Eytchison, R.M.

    1980-01-01

    The various programs which were intended to staff Three Mile Island with competent, trained operators and supervisors are reviewed. The analysis includes a review of the regulations concerning operator training and licensing, and describes how the requirements were implemented by the NRC, Metropolitan Edison Company, and Babcock and Wilcox Company. Finally the programs conducted by these three organisations are evaluated. (U.K.)

  18. Automated Planning and Scheduling for Planetary Rover Distributed Operations

    Science.gov (United States)

    Backes, Paul G.; Rabideau, Gregg; Tso, Kam S.; Chien, Steve

    1999-01-01

    Automated planning and Scheduling, including automated path planning, has been integrated with an Internet-based distributed operations system for planetary rover operations. The resulting prototype system enables faster generation of valid rover command sequences by a distributed planetary rover operations team. The Web Interface for Telescience (WITS) provides Internet-based distributed collaboration, the Automated Scheduling and Planning Environment (ASPEN) provides automated planning and scheduling, and an automated path planner provided path planning. The system was demonstrated on the Rocky 7 research rover at JPL.

  19. Assateague Island National Seashore alternative transportation systems planning study and business plan for alternative transportation

    Science.gov (United States)

    2012-08-31

    The purpose of this study was to (1) study the potential expansion of existing alternative transportation systems (bicycle facilities) and development of new alternative transportation systems in and around the Maryland District of Assateague Island ...

  20. Astrophysics science operations - Near-term plans and vision

    Science.gov (United States)

    Riegler, Guenter R.

    1991-01-01

    Astrophysics science operations planned by the Science Operations branch of NASA Astrophysics Division for the 1990s for the purpose of gathering spaceborne astronomical data are described. The paper describes the near-future plans of the Science Operations in the areas of the preparation of the proposal; the planning and execution of spaceborne observations; the collection, processing, and analysis data; and the dissemination of results. Also presented are concepts planned for introduction at the beginning of the 20th century, including the concepts of open communications, transparent instrument and observatory operations, a spiral requirements development method, and an automated research assistant.

  1. Optimal Economic Operation of Islanded Microgrid by Using a Modified PSO Algorithm

    Directory of Open Access Journals (Sweden)

    Yiwei Ma

    2015-01-01

    Full Text Available An optimal economic operation method is presented to attain a joint-optimization of cost reduction and operation strategy for islanded microgrid, which includes renewable energy source, the diesel generator, and battery storage system. The optimization objective is to minimize the overall generating cost involving depreciation cost, operation cost, emission cost, and economic subsidy available for renewable energy source, while satisfying various equality and inequality constraints. A novel dynamic optimization process is proposed based on two different operation control modes where diesel generator or battery storage acts as the master unit to maintain the system frequency and voltage stability, and a modified particle swarm optimization algorithm is applied to get faster solution to the practical economic operation problem of islanded microgrid. With the example system of an actual islanded microgrid in Dongao Island, China, the proposed models, dynamic optimization strategy, and solution algorithm are verified and the influences of different operation strategies and optimization algorithms on the economic operation are discussed. The results achieved demonstrate the effectiveness and feasibility of the proposed method.

  2. Strategic and Operational Plan for Integrating Transcriptomics ...

    Science.gov (United States)

    Plans for incorporating high throughput transcriptomics into the current high throughput screening activities at NCCT; the details are in the attached slide presentation presentation on plans for incorporating high throughput transcriptomics into the current high throughput screening activities at NCCT, given at the OECD meeting on June 23, 2016

  3. Review of droop-controlled bi-directional inverter in conducting islanded operation of photovoltaic systems

    Science.gov (United States)

    Khaw, Ace Lin Yi; Wong, Jianhui; Lim, Yun Seng

    2017-04-01

    Global warming due to the excessive greenhouse gas emissions has led to the emergence of green technologies in Malaysia, particularly photovoltaic (PV) systems. Under the current regulatory framework, islanded operation of the PV system is not permissible. As a result, any renewable energy sources will be disconnected immediately in the event of grid outages. This practice is to ensure the safety of working personnel, as well as the customer equipment connected within the distribution networks. In addition, there is no synchronizing equipment to aid the reconnection of the islanded network to the grid. However, with the shutdown of the Distributed Generator (DG) during islanded operation, the customers are not able to utilize the available renewable energy and the number of power interruption is not improved with the renewable energy sources. Therefore, the main objective of this paper is to investigate the feasibility of the PV system in conducting islanding operation with the use of Energy Storage System (ESS). This paper also proposes a control algorithm to maintain the voltage and frequency excursion within the statutory limit by manipulating the real and reactive power flow of the ESS within the transition period between grid connected and islanding operation.

  4. Simulation-based decision support for evaluating operational plans

    Directory of Open Access Journals (Sweden)

    Johan Schubert

    2015-12-01

    Full Text Available In this article, we describe simulation-based decision support techniques for evaluation of operational plans within effects-based planning. Using a decision support tool, developers of operational plans are able to evaluate thousands of alternative plans against possible courses of events and decide which of these plans are capable of achieving a desired end state. The objective of this study is to examine the potential of a decision support system that helps operational analysts understand the consequences of numerous alternative plans through simulation and evaluation. Operational plans are described in the effects-based approach to operations concept as a set of actions and effects. For each action, we examine several different alternative ways to perform the action. We use a representation where a plan consists of several actions that should be performed. Each action may be performed in one of several different alternative ways. Together these action alternatives make up all possible plan instances, which are represented as a tree of action alternatives that may be searched for the most effective sequence of alternative actions. As a test case, we use an expeditionary operation with a plan of 43 actions and several alternatives for these actions, as well as a scenario of 40 group actors. Decision support for planners is provided by several methods that analyze the impact of a plan on the 40 actors, e.g., by visualizing time series of plan performance. Detailed decision support for finding the most influential actions of a plan is presented by using sensitivity analysis and regression tree analysis. Finally, a decision maker may use the tool to determine the boundaries of an operation that it must not move beyond without risk of drastic failure. The significant contribution of this study is the presentation of an integrated approach for evaluation of operational plans.

  5. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs.

  6. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    International Nuclear Information System (INIS)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs

  7. Country Operational Plan and Reporting System

    Data.gov (United States)

    US Agency for International Development — This web-based information system allows for the annual entry and updating of Emergency Plan COPs, annual and semiannual program results, and budget information by...

  8. An Operational Process for Workforce Planning

    National Research Council Canada - National Science Library

    Emmerichs, Robert

    2004-01-01

    .... This report describes a methodology, developed by RAND at the behest of the Deputy Assistant Secretary of Defense for Civilian Personnel Policy, for conducting workforce planning-a methodology...

  9. Comparative analysis of proposals for the planning of the aggregate industry on the island of Tenerife

    Energy Technology Data Exchange (ETDEWEB)

    HernAndez-Duran, G.; Arranz-Gonzalez, C.; Vega-Panizo, R. de la

    2016-07-01

    The island of Tenerife is a territory with numerous protected natural areas and other areas which also deserve environmental protection, due to their ecological and landscape richness and values. According to current planning regulations, the aggregate mining industry is limited to a number of areas called extractive zones. The delimitation of such areas has some flaws and inconsistencies from the environmental point of view and from the consideration of the productive capacity of mining resources. This paper shows two models for environmental planning applied to the extractive activity for aggregates for the island of Tenerife, which could serve as alternatives to the current planning model: a model called zoned and another designated as zone- concentrated. These models provide improvements as far as respect for environmental values are concerned and are based on knowledge of the spatial distribution of geological materials. The conclusion is that this knowledge of the distribution of the potential mineral resources in the territory is the key to achieving the effective integration of mining in land-use planning, and to safeguard in the best possible way the mineral resources from the activities that may compromise their future availability. The applied methods could be extended to other territories, particularly islands, where it is very possible that there are similar problems to those that are occurring in Tenerife. (Author)

  10. [Methodology for an appreciative, dynamic and collaborative process: 3rd Canary Islands (Spain) Health Plan].

    Science.gov (United States)

    O'Shanahan Juan, José Joaquín; Hernández Rodríguez, Miguel Ángel; Del Otero Sanz, Laura; Henríquez Suárez, José Andrés; Mahtani Chugani, Vinita

    The need for new approaches to strategic planning by incorporating the perspectives of professionals and inhabitants has led to a new model for the 3rd Canary Islands (Spain) Health Plan (IIIPSC). A dual-phase participatory process using qualitative techniques is proposed: 1) local phase: a quantitative and qualitative study based on training and a research-action-participation initiative; and 2) insular phase: health conferences with face-to-face discussion of results in each health area (island) and proposals for action. The process prioritises problems and establishes a specific action plan for each island through initiatives that are considered to be viable, grouped by themes and weighted according to the potential impact on priority problems. This process of interaction may help to guide planning model changes and health policy decision-making, and was included in the IIIPSC Project for its parliamentary procedure. Copyright © 2016 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.

  11. Rolling schedule approaches for supply chain operations planning

    NARCIS (Netherlands)

    Spitter, J.M.

    2005-01-01

    Supply Chain Operations Planning (SCOP) involves the determination of an extensive production plan for a network of manufacturing and distribution entities within and across organizations. The production plan consist of order release decisions that allocate materials and resources in order to

  12. A Multiagent System for Autonomous Operation of Islanded Microgrids Based on a Power Market Environment

    Directory of Open Access Journals (Sweden)

    Myong-Chul Shin

    2010-12-01

    Full Text Available One of the most important requirements of microgrid operation is to maintain a constant frequency such as 50 Hz or 60 Hz, which is closely related to a power balance between supply and demand. In general, microgrids are connected to power grids and surplus/shortage power of microgrids is traded with power grids. Since islanded microgrids are isolated from any power grids, the decrease in generation or load-shedding can be used to maintain the frequency when a power imbalance between supply and demand occurs. The power imbalance restricts the electricity use of consumers in the case of supply shortage and the power supply of suppliers in the case of supply surplus. Therefore, the islanded microgrid should be operated to reduce power imbalance conditions. Meanwhile, the microgrid is a small-scale power system and the employment of skillful operators for effective operation of its components requires high costs. Therefore, automatic operation of the components is effective realistically. In addition, the components are distributed in the microgrid and their operation should consider their owners’ profits. For these reasons, a multiagent system application can be a good alternative for microgrid operation. In this paper, we present a multiagent system for autonomous operation of the islanded microgrid on a power market environment. The proposed multiagent system is designed based on a cooperative operation scheme. We show the functionality and the feasibility of the proposed multiagent system through several tests.

  13. A multiagent system for autonomous operation of islanded microgrids based on a power market environment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, H.-M. [Department of Electrical Engineering, University of Incheon/12-1, Sondo-dong, Yeonsu-gu, Incheon, 406-840 (Korea, Republic of); Kinoshita, T. [Graduate School of Information Science, Tohoku University/2-1-1, Katahira, Aoba-ku, Sendai, 980-8577 (Japan); Shin, M.-Ch. [School of Information and Communication Engineering, Sungkyunkwan University/300, Cheoncheon-dong, Jangan-gu, Suwon, Gyeonggi-do, 440-746 (Korea, Republic of)

    2010-12-15

    One of the most important requirements of microgrid operation is to maintain a constant frequency such as 50 Hz or 60 Hz, which is closely related to a power balance between supply and demand. In general, microgrids are connected to power grids and surplus/shortage power of microgrids is traded with power grids. Since islanded microgrids are isolated from any power grids, the decrease in generation or load-shedding can be used to maintain the frequency when a power imbalance between supply and demand occurs. The power imbalance restricts the electricity use of consumers in the case of supply shortage and the power supply of suppliers in the case of supply surplus. Therefore, the islanded microgrid should be operated to reduce power imbalance conditions. Meanwhile, the microgrid is a small-scale power system and the employment of skillful operators for effective operation of its components requires high costs. Therefore, automatic operation of the components is effective realistically. In addition, the components are distributed in the microgrid and their operation should consider their owners' profits. For these reasons, a multiagent system application can be a good alternative for microgrid operation. In this paper, we present a multiagent system for autonomous operation of the islanded microgrid on a power market environment. The proposed multiagent system is designed based on a cooperative operation scheme. We show the functionality and the feasibility of the proposed multiagent system through several tests. (authors)

  14. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  15. 36 CFR 223.32 - Timber sale operating plan.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Timber sale operating plan... SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER Timber Sale Contracts Contract Conditions and Provisions § 223.32 Timber sale operating plan. Sale contracts with a term of 2 years or more shall provide...

  16. 7 CFR 623.13 - Wetlands reserve plan of operations.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Wetlands reserve plan of operations. 623.13 Section... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE WATER RESOURCES EMERGENCY WETLANDS RESERVE PROGRAM § 623.13 Wetlands reserve plan of operations. (a) After NRCS has accepted the applicant for enrollment in the...

  17. Can statisticians beat surgeons at the planning of operations?

    NARCIS (Netherlands)

    Joustra, Paul; Meester, Reinier; van Ophem, Hans

    2013-01-01

    The planning of operations in the Academic Medical Center is primarily based on the assessments of the length of the operation by the surgeons. We investigate whether duration models employing the information available at the moment the planning is made, offer a better alternative. Our empirical

  18. Can statisticians beat surgeons at the planning of operations?

    NARCIS (Netherlands)

    Joustra, P.; Meester, R.; van Ophem, H.

    2011-01-01

    The planning of operations in the Academic Medical Center is primarily based on the assessments of the length of the operation by the surgeons. We investigate whether duration models employing the information available at the moment the planning is made, offer a better alternative. Our empirical

  19. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  20. Sustainable energy planning by using multi-criteria analysis application in the island of Crete

    International Nuclear Information System (INIS)

    Tsoutsos, Theocharis; Drandaki, Maria; Frantzeskaki, Niki; Iosifidis, Eleftherios; Kiosses, Ioannis

    2009-01-01

    The sustainable energy planning includes a variety of objectives, as the decision-making is directly related to the processes of analysis and management of different types of information (technological, environmental, economic and social). Very often, the traditional evaluation methods, such as the cost-benefit analysis and macro-economic indicators, are not sufficient to integrate all the elements included in an environmentally thorough energy plan. On the contrary the multiple criteria methods provide a tool, which is more appropriate to assemble and to handle a wide range of variables that is evaluated in different ways and thus offer valid decision support. This paper exploits the multi-criteria methodology for the sustainable energy planning on the island of Crete in Greece. A set of energy planning alternatives are determined upon the implementation of installations of renewable energy sources on the island and are assessed against economic, technical, social and environmental criteria identified by the actors involved in the energy planning arena. The study constitutes an exploratory analysis with the potential to assist decision makers responsible for regional energy planning, providing them the possibility of creating classifications of alternative sustainable energy alternatives.

  1. Political Ecology, Island Tourism Planning, and Climate Change Adaptation on Boracay, Philippines

    Directory of Open Access Journals (Sweden)

    Virgilio Maguigad

    2015-12-01

    Full Text Available This research paper presents a case study of the island of Boracay, Philippines, utilising a political ecology approach to climate change adaptation. The research finds that the island’s political ecology, especially the relationships among stakeholders, is strained. This creates challenges for various urban planning processes that require good working relationships. Climate change is expected to highlight these divisions as interactions among stakeholders (fulfilling zoning ordinance obligations, climate change adaptation- compliant land use plans, etc. are dependent on good stakeholder relations. Stakeholders realise that climate change is real and that sea level rise is already challenging existing zoning ordinances on urban beach development. However, this realisation must be integrated into political decision-making processes involving tourism stakeholders. The research also shows that the political ecology approach and methodology is applicable to studying the dynamics of climate change adaptation and tourism urbanisation on small islands.

  2. A Novel Decentralized Economic Operation in Islanded AC Microgrids

    Directory of Open Access Journals (Sweden)

    Hua Han

    2017-06-01

    Full Text Available Droop schemes are usually applied to the control of distributed generators (DGs in microgrids (MGs to realize proportional power sharing. The objective might, however, not suit MGs well for economic reasons. Addressing that issue, this paper proposes an alternative droop scheme for reducing the total active generation costs (TAGC. Optimal economic operation, DGs’ capacity limitations and system stability are fully considered basing on DGs’ generation costs. The proposed scheme utilizes the frequency as a carrier to realize the decentralized economic operation of MGs without communication links. Moreover, a fitting method is applied to balance DGs’ synchronous operation and economy. The effectiveness and performance of the proposed scheme are verified through simulations and experiments.

  3. Design, Operation, and Controlled-Island Operation of the U.S. Department of Energy Solar Decathlon 2013 Microgrid

    Energy Technology Data Exchange (ETDEWEB)

    Kurnik, C. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Butt, R. S. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Metzger, I. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Lavrova, O. [Univ. of New Mexico, Albuquerque, NM (United States); Patibandla, S. [Univ. of New Mexico, Albuquerque, NM (United States); Wagner, V. [Schneider Electric, Knoxville, TN (United States); Frankosky, M. [Schneider Electric, Knoxville, TN (United States); Wiegand, G. [MicroPlanet, Inc., Woodinville, WA (United States)

    2015-04-22

    This document reports on the design and operation of a high-capacity and high-penetration-ratio microgrid, which consists of 19 photovoltaic-powered residential houses designed by collegiate teams as part of their participation in the U.S. Department of Energy Solar Decathlon 2013. The microgrid was interconnected with the local utility, and resulting net-power and power-quality events were recorded in high detail (1-minute data sampling or better). Also, a controlled-island operation test was conducted to evaluate the microgrid response to additional events such as increased loads (e.g., from electric vehicles) and bypassing of voltage regulators. This temporary ground-laid microgrid was stable under nominal and island-operation conditions; adverse weather and loads did not lead to power-quality degradation.

  4. Prokaryotic communities and operating metabolisms in the surface and the permafrost of Deception Island (Antarctica)

    NARCIS (Netherlands)

    Blanco, Yolanda; Prieto-Ballesteros, Olga; Gómez, Manuel J.; Moreno-Paz, Mercedes; García-Villadangos, Miriam; Rodríguez-Manfredi, José Antonio; Cruz-Gil, Patricia; Sánchez-Román, Mónica; Rivas, Luis A.; Parro, Victor

    In this study we examined the microbial community composition and operating metabolisms on the surface and in the permafrost of Deception Island, (Antarctica) with an on site antibody microarray biosensor. Samples (down to a depth of 4.2m) were analysed with LDChip300 (Life Detector Chip), an

  5. Island operation capability in the Colombian electrical market: a promising ancillary service of distributed energy resources

    DEFF Research Database (Denmark)

    Marín-Jiménez, Juan D.; Carvajal-Quintero, Sandra; Guerrero, Josep M.

    2018-01-01

    is presented. Subsequently, an existing electrical distribution system with small hydropower plants is considered as a study case in order to identify the technical requirements set out for both, the distribution system and the generation source. Finally, taking into account the current Law and regulations......, a proposal is outlined for the implementation of the island operation capability ancillary service in the Colombian electrical system....

  6. Voltage Harmonic Compensation of a Microgrid Operating in Islanded and Grid-Connected Modes

    DEFF Research Database (Denmark)

    Savaghebi, Mehdi; Jalilian, Alireza; Vasquez, Juan C.

    2011-01-01

    In this paper, a method for voltage harmonic compensation in a microgrid operating in islanded and gridconnected modes is presented. Harmonic compensation is done through proper control of distributed generators (DGs) interface converters. In order to achieve proper sharing of the compensation...

  7. System Planning With The Hanford Waste Operations Simulator

    International Nuclear Information System (INIS)

    Crawford, T.W.; Certa, P.J.; Wells, M.N.

    2010-01-01

    At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

  8. How Will Rhode Island's New Hybrid Pension Plan Affect Teachers? A Report of the Public Pension Project

    Science.gov (United States)

    Johnson, Richard W.; Butrica, Barbara A.; Haaga, Owen; Southgate, Benjamin G.

    2014-01-01

    In 2011 Rhode Island replaced the stand-alone defined benefit pension plan it provided to state employees with a hybrid plan that reduced the defined benefit component and added a 401(k)-type, defined contribution component. Although controversial, the new hybrid plan will boost retirement incomes for most of the states public school teachers. Our…

  9. Contamination control plan for prelaunch operations

    Science.gov (United States)

    Austin, J. D.

    1983-01-01

    A unified, systematic plan is presented for contamination control for space flight systems. Allowable contaminant quantities, or contamination budgets, are determined based on system performance margins and system-level allowable degradations. These contamination budgets are compared to contamination rates in ground environments to establish the controls required in each ground environment. The use of feedback from contamination monitoring and some contamination control procedures are discussed.

  10. 33 CFR 334.1170 - San Pablo Bay, Calif.; gunnery range, Naval Inshore Operations Training Center, Mare Island...

    Science.gov (United States)

    2010-07-01

    ... range, Naval Inshore Operations Training Center, Mare Island, Vallejo. 334.1170 Section 334.1170... Operations Training Center, Mare Island, Vallejo. (a) The Danger Zone. A sector in San Pablo Bay delineated..., Vallejo, California, will conduct gunnery practice in the area during the period April 1 through September...

  11. Operations Program Plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1990-09-01

    This document, Revision 4 of the Operations Program Plan, has been developed as the seven-year master plan for operating of the Waste Isolation Pilot Plant (WIPP). Subjects covered include public and technical communications; regulatory and environmental programs; startup engineering; radiation handling, surface operations, and underground operations; waste certification and waste handling; transportation development; geotechnical engineering; experimental operations; engineering program; general maintenance; security program; safety, radiation, and regulatory assurance; quality assurance program; training program; administration activities; management systems program; and decommissioning. 243 refs., 19 figs., 25 tabs. (SM)

  12. Operation and Maintenance Plan for the 300-FF-5 Operable Unit

    International Nuclear Information System (INIS)

    Singleton, K.M.

    1996-09-01

    This document is the operation and maintenance plan for the 300-FF-5 groundwater operable unit. The purpose of this plan is to identify tasks necessary to verify the effectiveness of the selected alternative. This plan also describes the monitoring program and administrative tasks that will be used as the preferred alternative for the remediation of groundwater in the 300-FF-5 Operable Unit. The preferred alternative selected for remediation of groundwater consists of institutional controls

  13. Transition to Operations Plans for GPM Datasets

    Science.gov (United States)

    Zavodsky, Bradley; Jedlovec, Gary; Case, Jonathan; Leroy, Anita; Molthan, Andrew; Bell, Jordan; Fuell, Kevin; Stano, Geoffrey

    2013-01-01

    Founded in 2002 at the National Space Science Technology Center at Marshall Space Flight Center in Huntsville, AL. Focused on transitioning unique NASA and NOAA observations and research capabilities to the operational weather community to improve short-term weather forecasts on a regional and local scale. NASA directed funding; NOAA funding from Proving Grounds (PG). Demonstrate capabilities experimental products to weather applications and societal benefit to prepare forecasters for the use of data from next generation of operational satellites. Objective of this poster is to highlight SPoRT's research to operations (R2O) paradigm and provide examples of work done by the team with legacy instruments relevant to GPM in order to promote collaborations with groups developing GPM products.

  14. A Framework to Support the Fusion of Operation and Planning

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Yousu; Etingov, Pavel V.; Fitzhenry, Erin B.; Sharma, Poorva; Nguyen, Tony B.; Makarov, Yuri V.; Rice, Mark J.; Allwardt, Craig H.; Widergren, Steven E.

    2015-12-31

    The management of the nation’s power system has progressed to the point where the boundary lines between operations and planning are becoming blurred. The dynamic behavior of smart grid technologies brings pressures of incorporating the predictive capability from planning to enhance operations. These needs are requiring a smoother, better integrated interplay between the functional roles of planning and operations. This paper presents a framework to support the fusion of operation and planning. A case study of predicting the intra-hour deficiency in generation capability and ramping capacity and presenting the outputs to operators was conducted. The study shows the benefits of the fusion and the effectiveness of the framework. All the function blocks used in the study were built upon GridOPTICS Software System (GOSS), a software system middleware platform that facilitates deployment of new applications for the future power grid.

  15. Modular space station, phase B extension. Program operations plan

    Science.gov (United States)

    1971-01-01

    An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

  16. Runway Operations Planning: A Two-Stage Solution Methodology

    Science.gov (United States)

    Anagnostakis, Ioannis; Clarke, John-Paul

    2003-01-01

    The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. Thus, Runway Operations Planning (ROP) is a critical component of airport operations planning in general and surface operations planning in particular. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, may be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. Generating optimal runway operations plans was approached in with a 'one-stage' optimization routine that considered all the desired objectives and constraints, and the characteristics of each aircraft (weight class, destination, Air Traffic Control (ATC) constraints) at the same time. Since, however, at any given point in time, there is less uncertainty in the predicted demand for departure resources in terms of weight class than in terms of specific aircraft, the ROP problem can be parsed into two stages. In the context of the Departure Planner (OP) research project, this paper introduces Runway Operations Planning (ROP) as part of the wider Surface Operations Optimization (SOO) and describes a proposed 'two stage' heuristic algorithm for solving the Runway Operations Planning (ROP) problem. Focus is specifically given on including runway crossings in the planning process of runway operations. In the first stage, sequences of departure class slots and runwy crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the

  17. Sand and gravel mine operations and reclamation planning using microcomputers

    Energy Technology Data Exchange (ETDEWEB)

    Ariffin, J.B.

    1990-02-01

    The purpose of this study is to focus on the application of microcomputers, also known as personal computers, in planning for sand and gravel mine operations and reclamation at a site in Story County, Iowa. This site, called the Arrasmith Pit, is operated by Martin Marietta Aggregates, Inc. The Arrasmith site, which encompasses an area of about 25 acres, is a relatively small site for aggregate mining. However, planning for the concurrent mine operation and reclamation program at this site is just as critical as with larger sites and the planning process is the same.

  18. Planning logistics operations in the oil industry

    International Nuclear Information System (INIS)

    Dempster, M.A.H.; Hicks Pedron, N.; Medova, E.A.; Scott, J.E.; Sembos, A.

    2000-01-01

    In this paper we apply stochastic programming modelling and solution techniques to planning problems for a consortium of oil companies. A multiperiod supply, transformation and distribution scheduling problem - the Depot and Refinery Optimization Problem (DROP) - is formulated for strategic or tactical level planning of the consortium's activities. This deterministic model is used as a basis for implementing a stochastic programming formulation with uncertainty in the product demands and spot supply costs (DROPS), whose solution process utilizes the deterministic equivalent linear programming problem. We employ our STOCHGEN general purpose stochastic problem generator to 'recreate' the decision (scenario) tree for the unfolding future as this deterministic equivalent. To project random demands for oil products at different spatial locations into the future and to generate random fluctuations in their future prices/costs a stochastic input data simulator is developed and calibrated to historical industry data. The models are written in the modelling language XPRESS-MP and solved by the XPRESS suite of linear programming solvers. From the viewpoint of implementation of large-scale stochastic programming models this study involves decisions in both space and time and careful revision of the original deterministic formulation. The first part of the paper treats the specification, generation and solution of the deterministic DROP model. The stochastic version of the model (DROPS) and its implementation are studied in detail in the second part and a number of related research questions and implications discussed. (author)

  19. Operations planning for Space Station Freedom - And beyond

    Science.gov (United States)

    Gibson, Stephen S.; Martin, Thomas E.; Durham, H. J.

    1992-01-01

    The potential of automated planning and electronic execution systems for enhancing operations on board Space Station Freedom (SSF) are discussed. To exploit this potential the Operations Planning and Scheduling Subsystem is being developed at the NASA Johnson Space Center. Such systems may also make valuable contributions to the operation of resource-constrained, long-duration space habitats of the future. Points that should be considered during the design of future long-duration manned space missions are discussed. Early development of a detailed operations concept as an end-to-end mission description offers a basis for iterative design evaluation, refinement, and option comparison, particularly when used with an advanced operations planning system capable of modeling the operations and resource constraints of the proposed designs.

  20. Spacelab operations planning. [ground handling, launch, flight and experiments

    Science.gov (United States)

    Lee, T. J.

    1976-01-01

    The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.

  1. Planning and Operation of Commercial Application Center

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Kim, Kye Ryung; Lee, Tae Joon; Lee, Jae Hyeong; Park, Je Won; Lee, Jae Sang

    2003-06-15

    The objectives of this R and D project are as follows : First, transferring developed technologies to outside companies and operating technology market to vitalize technology transactions, Second, developing commercial application projects to transfer technologies for commercial purposes and to solve interface problems in commercial applications, Third, enhancing commercial utilizations of developed accelerator and beam utilization technologies, Finally. preparing infra-structures for the development of over 30 venture- businesses based on achieved technologies through the Proton Engineering Frontier Project.

  2. Planning and Operation of Commercial Application Center

    International Nuclear Information System (INIS)

    Kim, Jun Yeon; Kim, Kye Ryung; Lee, Tae Joon; Lee, Jae Hyeong; Park, Je Won; Lee, Jae Sang

    2003-06-01

    The objectives of this R and D project are as follows : First, transferring developed technologies to outside companies and operating technology market to vitalize technology transactions, Second, developing commercial application projects to transfer technologies for commercial purposes and to solve interface problems in commercial applications, Third, enhancing commercial utilizations of developed accelerator and beam utilization technologies, Finally. preparing infra-structures for the development of over 30 venture- businesses based on achieved technologies through the Proton Engineering Frontier Project

  3. Water Operational Plan 2011-2020

    OpenAIRE

    Asian Development Bank (ADB)

    2011-01-01

    ADB established through Strategy 2020 three strategic agendas to guide its work up to 2020—inclusive economic growth, environmentally sustainable growth, and regional integration. Water is common to each of these and is in fact central to their attainment. The Strategy refocuses ADB’s operations into five core areas that best support its agenda and reflect ADB’s comparative advantages and core competencies. One core area is infrastructure, where water resources management and the delivery of ...

  4. Operating and Assurance Program Plan. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

  5. Vehicle-to-Grid for islanded power system operation in Bornholm

    DEFF Research Database (Denmark)

    Pillai, Jayakrishnan Radhakrishna; Bak-Jensen, Birgitte

    2010-01-01

    Vehicle-to-Grid (V2G) systems are an emerging concept of utilizing the battery storage of electric vehicles (EVs) for providing power system regulation services. This technology could be used to balance the variable electricity generated from various renewable energy sources. This article considers...... a model of an aggregated electric vehicle based battery storage to support an isolated power system operating with a large wind power penetration in the Danish island of Bornholm. From the simulation results, the EV battery storages represented by the V2G systems are able to integrate more fluctuating...... wind power. The islanded Bornholm power system operates satisfactory for the case of replacing most of the conventional generator reserves with V2G systems, which may represent a future operation scenario....

  6. Stability and Reconstruction Operations Planning: Embrace Before Pursuing the Interagency

    National Research Council Canada - National Science Library

    Pazos, Rafael F

    2006-01-01

    .... government was the cause of poor SRO planning and execution. However, detailed analysis of the nature of military operations, the military's responsibilities, and the limited capacity of agencies within the U.S...

  7. Operating plan for the Office of International Health Programs

    International Nuclear Information System (INIS)

    1996-01-01

    In this report unified ideas are presented about what the Office of International Health Programs does, what the individual contributions are, and how the organization connects to the Department of Energy. The planning efforts have focused on the office's three areas of responsibility: Europe, Japan, and the Marshall Islands. Common to each technical program area are issues related to the following: health of populations exposed to radiation incidents and the associated medical aspects of exposure; dose reconstruction; training; and public involvement. Each of the program areas, its customers, and primary customer interests are described

  8. A planning concept incorporating the knowledge of both planning and operations personnel

    Energy Technology Data Exchange (ETDEWEB)

    Valenca, M M; Nepomuceno, L; Teixeira, J C.F.; Santos, Junior, A [Universidade Estadual de Campinas, SP (Brazil)

    1994-12-31

    In this paper, the electrical operation planning problem and the available technological possibilities for the improvement of planner`s work process are analyzed. The importance of the expert`s experience in efficient operation plans production is pointed out. The useful knowledge in planning and operating environments and their automation by Artificial Intelligence techniques are evaluated. Finally, conception of a decision-making support system allowing the interaction of storage expertise with analysis programs proposed, in order to improve the planning process. (author) 15 refs., 4 figs.

  9. Operations Research Applications in Audit Planning and Scheduling

    OpenAIRE

    Abdel-Aziz M. Mohamed

    2015-01-01

    This paper presents a state-of-the-art survey of the operations research models developed for internal audit planning. Two alternative approaches have been followed in the literature for audit planning: (1) identifying the optimal audit frequency; and (2) determining the optimal audit resource allocation. The first approach identifies the elapsed time between two successive audits, which can be presented as the optimal number of audits in a given planning horizon, or the ...

  10. 1997 Operating plan for the Office of International Health Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

  11. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume I. Organization plan

    International Nuclear Information System (INIS)

    1981-12-01

    This plan and the accompanying MFTF-B Integrated Operations Plan are submitted in response to UC/LLNL Purchase Order 3883801, dated July 1981. The organization plan also addresses the specific tasks and trade studies directed by the scope of work. The Integrated Operations Plan, which includes a reliability, quality assurance, and safety plan and an integrated logistics plan, comprises the burden of the report. In the first section of this volume, certain underlying assumptions and observations are discussed setting the requirements and limits for organization. Section B presents the recommended structure itself. Section C Device Availability vs Maintenance and Support Efforts and Section D Staffing Levels and Skills provide backup detail and justification. Section E is a trade study on maintenance and support by LLNL staff vs subcontract and Section F is a plan for transitioning from the construction phase into operation. A brief summary of schedules and estimated costs concludes the volume

  12. A Revenue Planning Tool for Charter School Operators

    Science.gov (United States)

    Keller, Eric; Hayes, Cheryl D.

    2009-01-01

    This revenue planning tool aims to help charter school operators develop a sound revenue base that can meet their school's current and future funding needs. It helps identify and assess potential public (federal, state, and local) and private funding sources. The tool incorporates a four-step revenue planning process which includes: (1)…

  13. Nevada test site radionuclide inventory and distribution: project operations plan

    International Nuclear Information System (INIS)

    Kordas, J.F.; Anspaugh, L.R.

    1982-01-01

    This document is the operational plan for conducting the Radionuclide Inventory and Distribution Program (RIDP) at the Nevada Test Site (NTS). The basic objective of this program is to inventory the significant radionuclides of NTS origin in NTS surface soil. The expected duration of the program is five years. This plan includes the program objectives, methods, organization, and schedules

  14. Operational workforce planning for check-in counters at airports

    DEFF Research Database (Denmark)

    Stolletz, Raik

    2010-01-01

    This paper addresses operation models for workforce planning for check-in systems at airports. We characterize different tasks of the hierarchical workforce planning problem with time-dependent demand. A binary linear programming formulation is developed for the fortnightly tour scheduling problem...

  15. Lead time anticipation in supply chain operations planning

    NARCIS (Netherlands)

    Jansen, M.M.; Kok, de A.G.; Fransoo, J.C.

    2013-01-01

    Linear programming (LP) models for Supply Chain Operations Planning are widely used in Advanced Planning Systems. The solution to the LP model is a proposal for order releases to the various production units (PU) in the supply network. There is a non-linear relationship between the work-in-process

  16. Aerosol can puncture device operational test plan

    International Nuclear Information System (INIS)

    Leist, K.J.

    1994-01-01

    Puncturing of aerosol cans is performed in the Waste Receiving and Processing Facility Module 1 (WRAP 1) process as a requirement of the waste disposal acceptance criteria for both transuranic (TRU) waste and low-level waste (LLW). These cans have contained such things as paints, lubricating oils, paint removers, insecticides, and cleaning supplies which were used in radioactive facilities. Due to Westinghouse Hanford Company (WHC) Fire Protection concerns of the baseline system's fire/explosion proof characteristics, a study was undertaken to compare the baseline system's design to commercially available puncturing devices. While the study found no areas which might indicate a risk of fire or explosion, WHC Fire Protection determined that the puncturing system must have a demonstrated record of safe operation. This could be obtained either by testing the baseline design by an independent laboratory, or by substituting a commercially available device. As a result of these efforts, the commercially available Aerosolv can puncturing device was chosen to replace the baseline design. Two concerns were raised with the system. Premature blinding of the coalescing/carbon filter, due to its proximity to the puncture and draining operation; and overpressurization of the collection bottle due to its small volume and by blinding of the filter assembly. As a result of these concerns, testing was deemed necessary. The objective of this report is to outline test procedures for the Aerosolv

  17. Enhancing Cassini Operations & Science Planning Tools

    Science.gov (United States)

    Castello, Jonathan

    2012-01-01

    The Cassini team uses a variety of software utilities as they manage and coordinate their mission to Saturn. Most of these tools have been unchanged for many years, and although stability is a virtue for long-lived space missions, there are some less-fragile tools that could greatly benefit from modern improvements. This report shall describe three such upgrades, including their architectural differences and their overall impact. Emphasis is placed on the motivation and rationale behind architectural choices rather than the final product, so as to illuminate the lessons learned and discoveries made.These three enhancements included developing a strategy for migrating Science Planning utilities to a new execution model, rewriting the team's internal portal for ease of use and maintenance, and developing a web-based agenda application for tracking the sequence of files being transmitted to the Cassini spacecraft. Of this set, the first two have been fully completed, while the agenda application is currently in the early prototype stage.

  18. Operations Plan for Support Network Development

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-06-30

    This report describes the operational processes and strategies that are building a support network for the National Security Technology Incubator (NSTI) program. The NSTI program currently is under development as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Grant No. DE FG52-07NA28084. Although the NSTI program offers a wide array of in-house business services, there are a certain number of services that will be provided by entities outside of Arrowhead Center. This report identifies the steps needed to develop an appropriate support network. The Arrowhead Center is working with external service providers and key stakeholders to establish feasible referral and implementation mechanics offering NSTI program participants the most comprehensive incubation services possible.

  19. Disruption management - operations research between planning and execution

    DEFF Research Database (Denmark)

    Clausen, Jens; Larsen, Jesper; Larsen, Allan

    2001-01-01

    For a large number of applications Operations Research has a proven track record: it can deliver high quality solutions for planning problems. Important examples can be found in the airline industry, logistics and production management. This report will describe real-world examples of a novel way...... of applying Operations Research: As plans have to be adjusted to take last minute changes into consideration, OR can play an active role in such a situation by producing, maybe even in a pro-actively role, alternative plans. This type of activity is called Disruption Management....

  20. C-Division annual review and operating plan, August 1990

    Energy Technology Data Exchange (ETDEWEB)

    Morse, N.R.

    1990-11-01

    The Computing and Communications Division is responsible for the Laboratory's Integrated Computing Network as well as Laboratory-wide communications. Our computing network, used by 8000 people distributed throughout the nation, constitutes one of the most powerful scientific computing facilities in the world. The purpose of this publication is to inform our clients of our strategic and operating plans. We review major accomplishments since early 1989 and describe our strategic planning goals and specific projects that will guide our operations over the next couple of years. Our mission statement, planning considerations, and management policies and practices are also included.

  1. Decision rules for spaceborne operations planning

    Science.gov (United States)

    Smith, Jeffrey H.

    1992-01-01

    Recent study of Space Station Freedom requirements for extravehicular activity (EVA) to perform external maintenance tasks emphasize an oversubscription of resources for performing on-orbit tasks. Extravehicular robotics (EVR) and cooperative EVA combined with EVR (using crew and robots synergistically to perform tasks) have been suggested as a part of the solution to reduce EVA. The question remains however, 'Under what conditions is it cost-effective to use the EVA and/or EVR resource.' The answer to such a question also has implications for the Space Station Freedom and its external maintenance as well as the Space Exploration Initiative (SEI) where the issue of work-system allocation is magnified by the long distances and scope of EVA work. This paper describes a simple technique of interest to operational planners and robot technology planners for determining in an economic context whether to use EVA alone, EVR alone, or Cooperative EVA. It is also shown that given: (1) the task times for these alternatives; and (2) the marginal costs of EVA, EVR, and IVA, the appropriate work system for performing the task can be identified. The paper illustrates how the work system choice is based on the ratio of costs. An example using Space Station Freedom data is presented to illustrate the trade-offs among alternative work-systems.

  2. Assessing, planning, and management of North Sea oil development effects in the Shetland Islands

    International Nuclear Information System (INIS)

    Nelson, J.G.; Butler, R.W.

    1993-01-01

    The Shetland Islands have long had the reputation of having planned and managed the onshore effects of offshore petroleum development very well. The islands are seen as something of a model for others to follow and have frequently been visited since the beginning of northern North Sea oil development in the early 1970s by those wishing to learn how to best approach offshore petroleum development in their home areas. In this assessment the authors wish to focus on views expressed on the effectiveness of the planning and managing of onshore effects of petroleum development and present an overview of interviewee statements on future issues. Emphasis will be placed on the environmental aspects, where that term is taken for present purposes, to include fauna, flora, water quality, and other resources and their relationships to industries such as fishing and tourism--although observations will also be made about planning and management of land use and socio-economic effects. The paper concludes with an attempt to set their findings in a broader pluralist context by relating them to the views expressed in recent books by Shetland residents that contain observations on oil effects although written for more general purposes

  3. Ra reactor operation plan for 1976 - Annex 6

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-01-01

    Contrary to previous years the RA reactor operation plan for 1976 is conditioned by more uncertainties than ever for the following reasons. It is planned for February to repair the components in order to eliminate the consequences of leaking from the vertical experimental channel VK-4 which happened in december 1975. Apart from this, measurements related to transfer of the core to highly enriched fuel under minimum power are foreseen to be performed in February. In April, it would be indispensable to locate the point of He gas leaking and its prevention. Core transfer to highly enriched fuel is planned for April for testing of the fuel elements under operating conditions and step by step increase of the power density up to the nominal power. Complete plan for core transfer would be available by the end of February 1976. It is planned to make-up for the mentioned delays from May-December 1976 [sr

  4. An innovative approach to capability-based emergency operations planning.

    Science.gov (United States)

    Keim, Mark E

    2013-01-01

    This paper describes the innovative use information technology for assisting disaster planners with an easily-accessible method for writing and improving evidence-based emergency operations plans. This process is used to identify all key objectives of the emergency response according to capabilities of the institution, community or society. The approach then uses a standardized, objective-based format, along with a consensus-based method for drafting capability-based operational-level plans. This information is then integrated within a relational database to allow for ease of access and enhanced functionality to search, sort and filter and emergency operations plan according to user need and technological capacity. This integrated approach is offered as an effective option for integrating best practices of planning with the efficiency, scalability and flexibility of modern information and communication technology.

  5. Control Architecture for Intentional Island Operation in Distribution Network with High Penetration of Distributed Generation

    DEFF Research Database (Denmark)

    Chen, Yu

    , the feasibility of the application of Artificial Neural Network (ANN) to ICA is studied, in order to improve the computation efficiency for ISR calculation. Finally, the integration of ICA into Dynamic Security Assessment (DSA), the ICA implementation, and the development of ICA are discussed....... to utilize them for maintaining the security of the power supply under the emergency situations, has been of great interest for study. One proposal is the intentional island operation. This PhD project is intended to develop a control architecture for the island operation in distribution system with high...... amount of DGs. As part of the NextGen project, this project focuses on the system modeling and simulation regarding the control architecture and recommends the development of a communication and information exchange system based on IEC 61850. This thesis starts with the background of this PhD project...

  6. Application of Grid Planning Method in Drilling-Blasting Operations

    OpenAIRE

    Dambov, Risto; Spasovski, Orce

    2012-01-01

    The problem occurs almost every day in operation and causes troubles to mining engineers. The right performance of drilling-blasting work is important for the successful operation of the entire excavation. The aim of the paper is to point out the importance of planning and how it can contribute to the right organization and make drilling-blasting and other mining activities in mine operations easier. Defining the activities and practical example that has been given are carried out by the u...

  7. Controlled Operation of the Islanded Portion of the International Council on Large Electric Systems (CIGRE) Low Voltage Distribution Network

    DEFF Research Database (Denmark)

    Mustafa, Ghullam; Bak, Claus Leth; Ali, Ehsan

    2017-01-01

    In islanding, a portion of the power network, comprised of the loads and distributed generation (DG) units, is isolated from the rest of the power grid and forms a micro grid (MG). In this condition, it becomes essential for the islanded MG to operate in a stable and controlled manner by providing...... ancillary services. When the MG is cut off from the main grid, the islanding must be detected by the DG units. In this condition it is essential that one of the controllers should be switched to the voltage-frequency (VF) control mode. In islanding, the network loses it slack reference and this reference...

  8. The Aggregate Planning For Trucking Operation in Cikarang Dry Port

    Directory of Open Access Journals (Sweden)

    Dwi Puspita Sari Utami

    2015-06-01

    Full Text Available Abstract. Cikarang Dry Port currently is the only dry port in Indonesia. This Dry Port has a role to connect or extend the Sea Port to the industrial areas located far from Sea Port. Thus, it creates a value added and also reduce costs. One of the operations done in Cikarang Dry Port is trucking operation. This research aims to examine the planning of 2014 trucking activity in Cikarang Dry Port to determine the right number of the truck that will be best occupied to manage all demands. The analysis begins with demand forecasting by using a moving average method of 12 months or one year period in 2013 which will be used as main information to develop the plans. There are three plans developed in this research. Based on the three plans, Plan A with minimum trucking plan with subcontracting is the most profitable which gives the highest profitability of Rp. 374,984,625. Recommendation for this research is using the current minimum number of 39 trucks rent with additional subcontracting when the demand is exceeding the capacity, thus, Cikarang Dry Port can occupy all demands and gain more profits. Keywords: Aggregate Planning; Scheduling; Trucking Operation; Moving Average; Cikarang Dry Port

  9. The Aggregate Planning For Trucking Operation in Cikarang Dry Port

    Directory of Open Access Journals (Sweden)

    Dwi Puspita Sari Utami

    2015-07-01

    Full Text Available Abstract. Cikarang Dry Port currently is the only dry port in Indonesia. This Dry Port has a role to connect or extend the Sea Port to the industrial areas located far from Sea Port. Thus, it creates a value added and also reduce costs. One of the operations done in Cikarang Dry Port is trucking operation. This research aims to examine the planning of 2014 trucking activity in Cikarang Dry Port to determine the right number of the truck that will be best occupied to manage all demands. The analysis begins with demand forecasting by using a moving average method of 12 months or one year period in 2013 which will be used as main information to develop the plans. There are three plans developed in this research. Based on the three plans, Plan A with minimum trucking plan with subcontracting is the most profitable which gives the highest profitability of Rp. 374,984,625. Recommendation for this research is using the current minimum number of 39 trucks rent with additional subcontracting when the demand is exceeding the capacity, thus, Cikarang Dry Port can occupy all demands and gain more profits.Keywords: Aggregate Planning; Scheduling; Trucking Operation; Moving Average; Cikarang Dry Port

  10. Science, policy, and stakeholders: developing a consensus science plan for Amchitka Island, Aleutians, Alaska.

    Science.gov (United States)

    Burger, Joanna; Gochfeld, Michael; Kosson, David S; Powers, Charles W; Friedlander, Barry; Eichelberger, John; Barnes, David; Duffy, Lawrence K; Jewett, Stephen C; Volz, Conrad D

    2005-05-01

    With the ending of the Cold War, the US Department of Energy is responsible for the remediation of radioactive waste and disposal of land no longer needed for nuclear material production or related national security missions. The task of characterizing the hazards and risks from radionuclides is necessary for assuring the protection of health of humans and the environment. This is a particularly daunting task for those sites that had underground testing of nuclear weapons, where the radioactive contamination is currently inaccessible. Herein we report on the development of a Science Plan to characterize the physical and biological marine environment around Amchitka Island in the Aleutian chain of Alaska, where three underground nuclear tests were conducted (1965-1971). Information on the ecology, geology, and current radionuclide levels in biota, water, and sediment is necessary for evaluating possible current contamination and to serve as a baseline for developing a plan to ensure human and ecosystem health in perpetuity. Other information required includes identifying the location of the salt water/fresh water interface where migration to the ocean might occur in the future and determining groundwater recharge balances, as well as assessing other physical/geological features of Amchitka near the test sites. The Science Plan is needed to address the confusing and conflicting information available to the public about radionuclide risks from underground nuclear blasts in the late 1960s and early 1970s, as well as the potential for volcanic or seismic activity to disrupt shot cavities or accelerate migration of radionuclides into the sea. Developing a Science Plan involved agreement among regulators and other stakeholders, assignment of the task to the Consortium for Risk Evaluation with Stakeholder Participation, and development of a consensus Science Plan that dealt with contentious scientific issues. Involvement of the regulators (State of Alaska), resource

  11. Iterative Repair Planning for Spacecraft Operations Using the Aspen System

    Science.gov (United States)

    Rabideau, G.; Knight, R.; Chien, S.; Fukunaga, A.; Govindjee, A.

    2000-01-01

    This paper describes the Automated Scheduling and Planning Environment (ASPEN). ASPEN encodes complex spacecraft knowledge of operability constraints, flight rules, spacecraft hardware, science experiments and operations procedures to allow for automated generation of low level spacecraft sequences. Using a technique called iterative repair, ASPEN classifies constraint violations (i.e., conflicts) and attempts to repair each by performing a planning or scheduling operation. It must reason about which conflict to resolve first and what repair method to try for the given conflict. ASPEN is currently being utilized in the development of automated planner/scheduler systems for several spacecraft, including the UFO-1 naval communications satellite and the Citizen Explorer (CX1) satellite, as well as for planetary rover operations and antenna ground systems automation. This paper focuses on the algorithm and search strategies employed by ASPEN to resolve spacecraft operations constraints, as well as the data structures for representing these constraints.

  12. Knowledge-Based operation planning system for boiling water reactors

    International Nuclear Information System (INIS)

    Tatsuya Iwamoto; Shungo Sakurai; Hitoshi Uematsu; Makoto Tsuiki

    1987-01-01

    A knowledge-Based Boiling Water Reactor operation planning system was developed to support core operators or core management engineers in making core operation plans, by automatically generating suboptimum core operation procedures. The procedures are obtained by searching a branching tree of the possible core status (nodes) and the elementary operations to change the core status (branches). A path that ends at the target node, and contains only operationally feasible nodes can be a candidate of the solution. The core eigenvalue, the power distribution and the thermal limit parameters at key points are calculated by running a three-dimensional (3-D) BWR core physics simulator to examine the feasibility of the nodes and the performance of candidates. To obtain a practically acceptable solution within a reasonable time rather than making a time-consuming effort to get the optimum one, the Depth-First-Search method, together with the heuristic branch-bounding, was used to search the branching tree. The system was applied to actual operation plannings with real plant data, and gave satisfactory results. It can be concluded that the system can be applied to generate core operation procedures as a substitute for core management experts

  13. Interactive orbital proximity operations planning system instruction and training guide

    Science.gov (United States)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1994-01-01

    This guide instructs users in the operation of a Proximity Operations Planning System. This system uses an interactive graphical method for planning fuel-efficient rendezvous trajectories in the multi-spacecraft environment of the space station and allows the operator to compose a multi-burn transfer trajectory between orbit initial chaser and target trajectories. The available task time (window) of the mission is predetermined and the maneuver is subject to various operational constraints, such as departure, arrival, spatial, plume impingement, and en route passage constraints. The maneuvers are described in terms of the relative motion experienced in a space station centered coordinate system. Both in-orbital plane as well as out-of-orbital plane maneuvering is considered. A number of visual optimization aids are used for assisting the operator in reaching fuel-efficient solutions. These optimization aids are based on the Primer Vector theory. The visual feedback of trajectory shapes, operational constraints, and optimization functions, provided by user-transparent and continuously active background computations, allows the operator to make fast, iterative design changes that rapidly converge to fuel-efficient solutions. The planning tool is an example of operator-assisted optimization of nonlinear cost functions.

  14. Can Perceptions of Environmental and Climate Change in Island Communities Assist in Adaptation Planning Locally?

    Science.gov (United States)

    Aswani, Shankar; Vaccaro, Ismael; Abernethy, Kirsten; Albert, Simon; de Pablo, Javier Fernández-López

    2015-12-01

    Local perceptions of environmental and climate change, as well as associated adaptations made by local populations, are fundamental for designing comprehensive and inclusive mitigation and adaptation plans both locally and nationally. In this paper, we analyze people's perceptions of environmental and climate-related transformations in communities across the Western Solomon Islands through ethnographic and geospatial methods. Specifically, we documented people's observed changes over the past decades across various environmental domains, and for each change, we asked respondents to identify the causes, timing, and people's adaptive responses. We also incorporated this information into a geographical information system database to produce broad-scale base maps of local perceptions of environmental change. Results suggest that people detected changes that tended to be acute (e.g., water clarity, logging intensity, and agricultural diseases). We inferred from these results that most local observations of and adaptations to change were related to parts of environment/ecosystem that are most directly or indirectly related to harvesting strategies. On the other hand, people were less aware of slower insidious/chronic changes identified by scientific studies. For the Solomon Islands and similar contexts in the insular tropics, a broader anticipatory adaptation planning strategy to climate change should include a mix of local scientific studies and local observations of ongoing ecological changes.

  15. Diverting the tourists: a spatial decision-support system for tourism planning on a developing island

    Science.gov (United States)

    Beedasy, Jaishree; Whyatt, Duncan

    Mauritius is a small island (1865 km 2) in the Indian Ocean. Tourism is the third largest economic sector of the country, after manufacturing and agriculture. A limitation of space and the island's vulnerable ecosystem warrants a rational approach to tourism development. The main problems so far have been to manipulate and integrate all the factors affecting tourism planning and to match spatial data with their relevant attributes. A Spatial Decision Support System (SDSS) for sustainable tourism planning is therefore proposed. The proposed SDSS design would include a GIS as its core component. A first GIS model has already been constructed with available data. Supporting decision-making in a spatial context is implicit in the use of GIS. However the analytical capability of the GIS has to be enhanced to solve semi-structured problems, where subjective judgements come into play. The second part of the paper deals with the choice, implementation and customisation of a relevant model to develop a specialised SDSS. Different types of models and techniques are discussed, in particular a comparison of compensatory and non-compensatory approaches to multicriteria evaluation (MCE). It is concluded that compensatory multicriteria evaluation techniques increase the scope of the present GIS model as a decision-support tool. This approach gives the user or decision-maker the flexibility to change the importance of each criterion depending on relevant objectives.

  16. Decommissioning Planning during the Operation of the Loviisa NPP. Planning, Management and Organizational Aspects

    Energy Technology Data Exchange (ETDEWEB)

    Tuunanen, J. P.; Eurajoki, T. E.E., [Fortum Power and Heat Ltd, Nuclear Waste Espoo (Finland)

    2013-08-15

    The first decommissioning plan for Loviisa nuclear power plant was written already in 1980's, when the plant had just started operation. The plan has been updated in 5-6 years intervals and this work still continues towards the final decommissioning plan. The decommissioning plan is based on immediate dismantling option and final disposal of decommissioning waste to the extension of the on site final disposal facility for low and intermediate level waste. The decommissioning planning has been organized as an independent project, which is realised in close cooperation with Fortum's research programme on radioactive waste management. The plant personnel are involved in the planning work through providing operating experience on contamination and activation of systems, structures and components. Later in the decommissioning phase the plant personnel will form the main part of the decommissioning organization. (author)

  17. An Efficient Missile Loadout Planning Tool for Operational Planners

    Science.gov (United States)

    2017-06-01

    dictionaries to access values for penalties and feasibility checks. VBA user-defined types are created to identify the base set of missions and base...Missile Defense TLAM Tomahawk Land Attack Missiles TSC Tomahawk Strike Coordinator USN United States Navy VBA Visual Basic for Applications VLP... accessible and usable form, we can start basing our loadouts on actual operational plans (OPLAN) and concept plans (CONPLAN). This will give fleet

  18. Operational planning of refineries; Planejamento operacional de refinarias

    Energy Technology Data Exchange (ETDEWEB)

    Sinay, Maria Cristina Fogliatti de [Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil); Bueno, Catia [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    The activities integration that compose the petroleum logistic chain makes more complex its planning which is normally done in a joined level, using operation research models in order to find optimized solutions. When this integrated planning is repassed to the companies and its constitutes parts (mainly refinery) uncertainness are generated about the solution that will be adopted in case of new restrictions appear. Then, the purpose of this work is propose a procedure that is capable to adequate and specifies optimized solutions presented by corporative model to refinery operations, using 'What-if' and deterministic simulation technique with optimization. To achieve this objective will be analysed typical activities in refineries and basic principles to their operational planning. (author)

  19. Tool for Military Logistics Planning of Peace Support Operations: The OTAS Planning Tool

    NARCIS (Netherlands)

    Merrienboer, S.A. van

    1998-01-01

    Within the research group Operations Research Studies Army of the TNO Physics and Electronics Laboratory the OTAS planning tool is developed for the Royal Netherlands Armed Forces. This paper gives a general and brief description of the tool.

  20. Web Application Software for Ground Operations Planning Database (GOPDb) Management

    Science.gov (United States)

    Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey

    2013-01-01

    A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

  1. MIPPA: First Broad Changes to Medicare Part D Plan Operations.

    Science.gov (United States)

    LeMasurier, Jean D; Edgar, Babette

    2009-04-01

    In July 2008, as part of broad Medicare reform, Congress passed the first major legislative changes to Medicare Part D since its enactment in 2003-the Medicare Improvements for Patients and Providers Act. This new legislation has significant implications for how Part D plans can market and enroll Medicare beneficiaries. The new legislation also strengthened beneficiary protections, expanded the low-income subsidy provisions originally included in Part D, and expanded Part D coverage. These changes have significant implications for the operation of Part D plans and can affect those involved in benefit design, including specialty pharmacy coverage. This article discusses the major changes that took effect on January 1, 2009, and have immediate implications for Part D plan sponsors, including Medicare Advantage plans and stand-alone prescription drug plans.

  2. Approach to operational mine planning: Case study Tamnava West

    Directory of Open Access Journals (Sweden)

    Stevanović Dejan R.

    2014-01-01

    Full Text Available In contemporary mining industry is very difficult to achieve production targets and profit without investing effort in detailed excavation planning. It is especially true for deposits with complex geological structure and production technology, as is the case for many coal mines in Serbia. The majority of coal production is used for generation of electricity in power plant. This fact is the main reason why production objectives of coal mine and power plant are strongly connected. Due to the fluctuation of the coal quality, operational mine planning (as a part of coal homogenization process, is of critical importance for managing successful coal quality control and meeting criteria of power plant. This paper investigates advantage of proper operational planning on coal quality control process and overall production performance. For better understanding case study is conducted on open pit Tamnava West field. Successful operational mine planning is almost impossible without use of modern software packages. For that reason in presented case study operational mine planning is done with Minex software.

  3. UMTS network planning, optimization, and inter-operation with GSM

    CERN Document Server

    Rahnema, Moe

    2008-01-01

    UMTS Network Planning, Optimization, and Inter-Operation with GSM is an accessible, one-stop reference to help engineers effectively reduce the time and costs involved in UMTS deployment and optimization. Rahnema includes detailed coverage from both a theoretical and practical perspective on the planning and optimization aspects of UMTS, and a number of other new techniques to help operators get the most out of their networks. Provides an end-to-end perspective, from network design to optimizationIncorporates the hands-on experiences of numerous researchersSingle

  4. Organizing for low cost space operations - Status and plans

    Science.gov (United States)

    Lee, C.

    1976-01-01

    Design features of the Space Transportation System (vehicle reuse, low cost expendable components, simple payload interfaces, standard support systems) must be matched by economical operational methods to achieve low operating and payload costs. Users will be responsible for their own payloads and will be charged according to the services they require. Efficient use of manpower, simple documentation, simplified test, checkout, and flight planning are firm goals, together with flexibility for quick response to varying user needs. Status of the Shuttle hardware, plans for establishing low cost procedures, and the policy for user charges are discussed.

  5. Metering Plan: Intelligent Operational Strategies Through Enhanced Metering Systems

    Energy Technology Data Exchange (ETDEWEB)

    Pope, Jason E.

    2016-07-27

    The Sustainability Program at Pacific Northwest National Laboratory (PNNL) has adopted a “triple-bottom-line” approach of environmental stewardship, social responsibility, and economic prosperity to its operations. Metering at PNNL works in support of all three, specifically to measure and inform building energy use and greenhouse gas emissions and minimize water use. The foundation for metering at PNNL is a core goal set, which consists of four objectives: providing accurate data without interruption, analyzing data while it is still new, providing actionable recommendations to operations management, and ensuring PNNL’s compliance with contract metering requirements. These core objectives guide the decisions that we make during annual planning and as we operate throughout the year. This 2016 edition of the Metering Plan conveys the metering practices for and vision of the Sustainability Program. Changes in this plan from the 2015 edition include updated tables and an enhanced discussion on energy tracking systems used at PNNL. This plan also discusses updated benchmarking strategies using PNNL’s graphics and analytics tool, BuildingOS by Lucid Design Group. This plan presents our progress toward the metering goals shared by all federal agencies and highlights our successful completion of metering requirements. Currently, PNNL is fully compliant with the applicable legislative and Executive Order metering requirements. PNNL’s approach to the installation of new meters will be discussed. Perhaps most importantly, this plan details the analysis techniques utilized at PNNL that rely on the endless streams of data newly available as a result of increased meter deployment over the last several years. Previous Metering Plans have documented specific meter connection schemes as PNNL focused on deploying meters in a first step toward managing energy and water use. This plan serves not only to highlight PNNL’s successful completion of agency metering goals, but

  6. Orbital Express mission operations planning and resource management using ASPEN

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-04-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less labor-power rises. Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Like a tow-truck delivering gas to a car on the road, the "servicing" satellite of OE had to find the "client" from several kilometers away, connect directly to the client, and transfer fluid (or a battery) autonomously, while on earth-orbit. The mission met 100% of its success criteria, and proved that autonomous satellite servicing is now a reality for space operations. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. As the constraints for execution could change weekly, daily, and even hourly, the tools used create the mission execution plans needed to be flexible and adaptable to many different kinds of changes. At the same time, the hard constraints of the plans needed to be maintained and satisfied. The Automated Scheduling and Planning Environment (ASPEN) tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, an overview of the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the NASA's Earth Observing One mission's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  7. FCFPYRO simulation of the first year FCF hot operation plan

    International Nuclear Information System (INIS)

    Liaw, J.R.; Li, S.X.; Benedict, R.W.

    1996-01-01

    A simulation study has been successfully completed according to the first year FCF operational plan for the treatment of EBR-II spent fuels. Material flow by nuclides for each processing step and radioactive decays during the process are considered. The FCFPYRO code package is a very useful tool to provide step-by-step information essential to the analysis of operational strategy, process chemistry, heat removal, criticality safety, and radiological health issues in FCF

  8. Computer guided pre-operative planning and dental implant placement

    Directory of Open Access Journals (Sweden)

    Dušan Grošelj

    2007-05-01

    Full Text Available Background: Implants in dentistry are, besides fixed, removable and maxillofacial prosthodontics, one of the reliable possibility to make functional and aesthetic rehabilitation of the edentulism. Surgical and prosthodontic implant complications are often an inattentive consequence of wrong diagnosis, planning, and placement. In this article we present a technique using a highly advanced software program along with a rapid prototyping technology named stereolithography. A planning software for implant placement needs basically the high quality computed tomographic scan of one or both jaws for making accurate preoperative diagnostics and 3D preoperative plan. Later individual drill guide is designed and generated based on both the CT images and the preoperative planning. The patient specific drill guide transfers the virtual planning to the patient’s mouth at time of surgery.Conclusions: The advantages of computer guided implantology are the better prepared surgery with visualisation of critical anatomic structures, assessment of available bone and data about bone quality, increased confidence for the surgeon, deceased operative time, less frequent use of bone grafts, higher quality of collaboration between specialists and prosthetic lab and better communication with patients. Radiographic examination of the operation field for computer guided planning for implant placement is due to high costs justified as the most important information source on the areas to be implanted.

  9. Operational radioactive waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1980-11-01

    The Operational Radioactive Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  10. Phased project planning and development in anticipation of operational programs

    Science.gov (United States)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  11. Planning of operation & maintenance using risk and reliability based methods

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Operation and maintenance (OM) of offshore wind turbines contributes with a substantial part of the total levelized cost of energy (LCOE). The objective of this paper is to present an application of risk- and reliability-based methods for planning of OM. The theoretical basis is presented...

  12. Anticipation of lead time performance in supply chain operations planning

    NARCIS (Netherlands)

    Jansen, M.M.; Kok, de A.G.; Fransoo, J.C.

    2009-01-01

    Whilst being predominantly used in practice, linear and mixed integer programming models for Supply Chain Operations Planning (SCOP) are not well suited for modeling the relationship between the release of work to a production unit and its output over time. In this paper we propose an approach where

  13. 7 CFR 272.2 - Plan of operation.

    Science.gov (United States)

    2010-01-01

    ... next year, State agencies shall consider major corrective action objectives, existing program strengths... Plan of Operation. The State and FNS (USDA) further agree to fully comply with any changes in Federal... belief, religion, handicap, or national origin, be excluded from participation in, be denied the benefits...

  14. The Operational Planning Model of Transhipment Processes in the Port

    Directory of Open Access Journals (Sweden)

    Mia Jurjević

    2016-04-01

    Full Text Available Modelling of a traffic system refers to the efficiency of operations for establishing successful business performance by examining the possibilities for its improvement. The main purpose of each container terminal is to ensure continuity and dynamics of the flow of containers. The objective of this paper is to present a method for determining the amount of certain types of containers that can be transhipped at each berth, with the proper cargo handling, taking into account minimum total costs of transhipment. The mathematical model of planning the transhipment and transportation of containers at the terminal is presented. The optimal solution, obtained with the method of linear programming, represents a plan for container deployment that will ensure effective ongoing process of transhipment, providing the lowest transhipment costs. The proposed model, tested in the port of Rijeka, should be the basis for makingadequate business decisions in the operational planning of the container terminal.

  15. Improved operational performance through the use of business planning tools

    International Nuclear Information System (INIS)

    Hoelscher, H.L.

    1996-01-01

    Improved operational performance at Point Beach Nuclear Plant is based on a focused business plan. Quantitative goals that compare past performance with the performance of potential competitors are the basis of the business plan. This establishes goals for the nuclear power business unit which support corporate goals. Strategies and objectives are then developed to meet the established goals. To continue support for these strategies and objectives, individual performance plans are developed for all management personnel. These performance management plans identify individual contributor actions to support the goals, and also provide periodic feedback for changes to better prioritize individual actions. Performance criteria are also established to measure progress toward achieving the goals. The author also has a program to provide incentives for improved performance based upon success of the organization in achieving established goals

  16. The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

    Science.gov (United States)

    Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray

    2012-01-01

    In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

  17. Application of reliability worth concepts in power system operational planning

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Silva, A.M. Leite da [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Pereira, M V.F. [Power System Research (PSR), Inc., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This work describes the application of a new methodology for calculating total system interruption costs in power system operational planning. Some important operational aspects are discussed: chronological load curves, customer damage functions for each consumer class, maintenance scheduling and non-exponential repair times. It is also presented the calculation of the probability distribution of the system interruption cost to improve the decision making process associated with alternative operational strategies. The Brazilian Southeastern system is used to illustrate all previous applications. (author) 24 refs., 8 figs., 4 tabs.

  18. Control of hybrid AC/DC microgrid under islanding operational conditions

    DEFF Research Database (Denmark)

    Ding, G.; Gao, F.; Zhang, S.

    2014-01-01

    This paper presents control methods for hybrid AC/DC microgrid under islanding operation condition. The control schemes for AC sub-microgrid and DC sub-microgrid are investigated according to the power sharing requirement and operational reliability. In addition, the key control schemes...... of interlinking converter with DC-link capacitor or energy storage, which will devote to the proper power sharing between AC and DC sub-microgrids to maintain AC and DC side voltage stable, is reviewed. Combining the specific control methods developed for AC and DC sub-microgrids with interlinking converter......, the whole hybrid AC/DC microgrid can manage the power flow transferred between sub-microgrids for improving on the operational quality and efficiency....

  19. A compilation of necessary elements for a local government continuity of operations plan

    OpenAIRE

    Cashen, Kevin M.

    2006-01-01

    CHDS State/Local National and state homeland security strategies call for continuity of operations plan development. The 2006 Nationwide Plan Review Phase II Report identifies continuity of operations plan development as a state and local goal with a federal goal of providing continuity of operations plan development support. Most local governments do not have a continuity of operation plan or it needs to be updated. Continuity of operations plan guidance is provided by a variety of intern...

  20. Droop-Controlled Inverters with Seamless Transition between Islanding and Grid-Connected Operations

    DEFF Research Database (Denmark)

    Hu, Shang-Hung; Kuo, Chun-Yi; Lee, Tzung-Lin

    2011-01-01

    This paper presents a seamless transition method for droop-controlled inverters to operate in both islanding and grid-connected modes. A local PLL and a virtual inductance are designed to ride through transient when the inverter switches between two modes with no synchronization. The proposed...... method can cooperatively work with well-developed droop controls so that the inverters are able to share load among them as well as subsist under transient events of the utility. Theoretical analysis and experimental results validate effectiveness of the proposed method....

  1. Urban surface temperature behaviour and heat island effect in a tropical planned city

    Science.gov (United States)

    Ahmed, Adeb Qaid; Ossen, Dilshan Remaz; Jamei, Elmira; Manaf, Norhashima Abd; Said, Ismail; Ahmad, Mohd Hamdan

    2015-02-01

    Putrajaya is a model city planned with concepts of a "city in the garden" and an "intelligent city" in the tropics. This study presents the behaviour of the surface temperature and the heat island effect of Putrajaya. Findings show that heat island intensity is 2 °C on average at nighttime and negligible at daytime. But high surface temperature values were recorded at the main boulevard due to direct solar radiation incident, street orientation in the direction of northeast and southwest and low building height-to-street width ratio. Buildings facing each other had cooling effect on surfaces during the morning and evening hours; conversely, they had a warming effect at noon. Clustered trees along the street are effective in reducing the surface temperature compared to scattered and isolated trees. Surface temperature of built up areas was highest at noon, while walls and sidewalks facing northwest were hottest later in the day. Walls and sidewalks that face northwest were warmer than those that face southeast. The surface temperatures of the horizontal street surfaces and of vertical façades are at acceptable levels relative to the surface temperature of similar surfaces in mature cities in subtropical, temperate and Mediterranean climates.

  2. Operations plan for the Regional Seismic Test Network

    International Nuclear Information System (INIS)

    1981-01-01

    The Regional Seismic Test Network program was established to provide a capability for detection of extremely sensitive earth movements. Seismic signals from both natural and man-made earth motions will be analyzed with the ultimate objective of accurately locating underground nuclear explosions. The Sandia National Laboratories, Albuquerque, has designed an unattended seismic station capable of recording seismic information received at the location of the seismometers installed as part of that specific station. A network of stations is required to increase the capability of determining the source of the seismic signal and the location of the source. Current plans are to establish a five-station seismic network in the United States and Canada. The Department of Energy, Nevada Operations Office, has been assigned the responsibility for deploying, installing, and operating these remote stations. This Operation Plan provides the basic information and tasking to accomplish this assignment

  3. ELECTRIC MOTORS MAINTENANCE PLANNING FROM ITS OPERATING VARIABLES

    Directory of Open Access Journals (Sweden)

    Francisco RODRIGUES

    2017-07-01

    Full Text Available The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, conse-quently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algo-rithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface, including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition data, also including the communication protocols among different logical applications.

  4. Electric Motors Maintenance Planning From Its Operating Variables

    Science.gov (United States)

    Rodrigues, Francisco; Fonseca, Inácio; Farinha, José Torres; Ferreira, Luís; Galar, Diego

    2017-09-01

    The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, consequently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions) to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algorithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface), including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition) data, also including the communication protocols among different logical applications.

  5. Multi Sector Planning Tools for Trajectory-Based Operations

    Science.gov (United States)

    Prevot, Thomas; Mainini, Matthew; Brasil, Connie

    2010-01-01

    This paper discusses a suite of multi sector planning tools for trajectory-based operations that were developed and evaluated in the Airspace Operations Laboratory (AOL) at the NASA Ames Research Center. The toolset included tools for traffic load and complexity assessment as well as trajectory planning and coordination. The situation assessment tools included an integrated suite of interactive traffic displays, load tables, load graphs, and dynamic aircraft filters. The planning toolset allowed for single and multi aircraft trajectory planning and data communication-based coordination of trajectories between operators. Also newly introduced was a real-time computation of sector complexity into the toolset that operators could use in lieu of aircraft count to better estimate and manage sector workload, especially in situations with convective weather. The tools were used during a joint NASA/FAA multi sector planner simulation in the AOL in 2009 that had multiple objectives with the assessment of the effectiveness of the tools being one of them. Current air traffic control operators who were experienced as area supervisors and traffic management coordinators used the tools throughout the simulation and provided their usefulness and usability ratings in post simulation questionnaires. This paper presents these subjective assessments as well as the actual usage data that was collected during the simulation. The toolset was rated very useful and usable overall. Many elements received high scores by the operators and were used frequently and successfully. Other functions were not used at all, but various requests for new functions and capabilities were received that could be added to the toolset.

  6. Methods and approaches to support Indigenous water planning: An example from the Tiwi Islands, Northern Territory, Australia

    Science.gov (United States)

    Hoverman, Suzanne; Ayre, Margaret

    2012-12-01

    SummaryIndigenous land owners of the Tiwi Islands, Northern Territory Australia have begun the first formal freshwater allocation planning process in Australia entirely within Indigenous lands and waterways. The process is managed by the Northern Territory government agency responsible for water planning, the Department of Natural Resources, Environment, The Arts and Sport, in partnership with the Tiwi Land Council, the principal representative body for Tiwi Islanders on matters of land and water management and governance. Participatory planning methods ('tools') were developed to facilitate community participation in Tiwi water planning. The tools, selected for their potential to generate involvement in the planning process needed both to incorporate Indigenous knowledge of water use and management and raise awareness in the Indigenous community of Western science and water resources management. In consultation with the water planner and Tiwi Land Council officers, the researchers selected four main tools to develop, trial and evaluate. Results demonstrate that the tools provided mechanisms which acknowledge traditional management systems, improve community engagement, and build confidence in the water planning process. The researchers found that participatory planning approaches supported Tiwi natural resource management institutions both in determining appropriate institutional arrangements and clarifying roles and responsibilities in the Islands' Water Management Strategy.

  7. Bereavement care interventions and outcome criteria planned by community nurses in the Canary Islands.

    Science.gov (United States)

    Rodríguez-Álvaro, Martín; García-Hernández, Alfonso Miguel; Brito-Brito, Pedro Ruymán; Aguirre-Jaime, Armando; Fernández-Gutiérrez, Domingo Ángel

    2018-02-19

    Nursing care in bereavement is complex. Primary health care is the ideal setting to support the bereaved, but we do not know much about the care plans designed by primary health care nurses in the treatment of grief. To identify the outcomes criteria and interventions planned by nurses for mourners with and without complications in the Canary Islands. Retrospective longitudinal study, using the electronic health records of the Canary Islands health service of people with a diagnosis of grieving, risk of complicated grieving and complicated grieving, in the period 2009-2014. NOC outcomes criteria were recorded in 67% of the mourners, and up to 24 different outcomes were identified. The main outcomes measures were Grief resolution; Psychosocial adjustment, Life change; Coping; Family coping; Family social climate and Caregiver emotional health. The remaining outcomes were present in less than 1% of the mourners. Although the outcomes criteria proposed by nurses in the mourners with and without complications were quite homogeneous, differences in interventions were found. In 67% of the cases, NIC interventions were reported. Ninety-nine different interventions were identified in the mourners; the most frequent were Emotional support; Grief work facilitation; Active listening; Coping enhancement and counselling. The remaining identified interventions were present in less than 5% of patients. The main interventions in the mourners with complications were Grief work facilitation; Coping enhancement; Active listening; Counselling and Family integrity promotion. Nurses state that there are more interventions and outcomes in mourners with complications. Given the few methodologically reliable studies that prove their effectiveness, continued research in this area is recommended. Copyright © 2017 Elsevier España, S.L.U. All rights reserved.

  8. A Practice of Secure Development and Operational Environment Plan

    International Nuclear Information System (INIS)

    Park, Jaekwan; Seo, Sangmun; Suh, Yongsukl; Park, Cheol

    2017-01-01

    This paper suggests a practice of plan for SDOE establishment in a nuclear I and C. First, it is necessary to perform a requirements analysis to define key regulatory issues and determine the target systems. The analysis includes a survey to find out the applicable measures credited internationally. Based on the analysis results, this paper proposes an implementation plan including a process harmonizing security activities with legacy software activities and applicable technical, operational, and management measures for target systems. Recently, nuclear I and C has been faced with two security issues, cyber security (CS) and secure development and operational environment (SDOE). Unlike cyber security, few studies on planning SDOE have been presented. This paper suggests a plan for establishing an SDOE in a nuclear I and C. This paper defines three key considerations to comply with the regulatory position of RG. 1.152(R3) and proposes a process harmonizing the security activities with legacy software activities. In addition, this paper proposes technical, operational, and management measures applicable for SDOE.

  9. IBM PC/IX operating system evaluation plan

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Granier, Martin; Hall, Philip P.; Triantafyllopoulos, Spiros

    1984-01-01

    An evaluation plan for the IBM PC/IX Operating System designed for IBM PC/XT computers is discussed. The evaluation plan covers the areas of performance measurement and evaluation, software facilities available, man-machine interface considerations, networking, and the suitability of PC/IX as a development environment within the University of Southwestern Louisiana NASA PC Research and Development project. In order to compare and evaluate the PC/IX system, comparisons with other available UNIX-based systems are also included.

  10. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  11. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  12. 10 CFR 436.102 - General operations plan format and content.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false General operations plan format and content. 436.102... PROGRAMS Guidelines for General Operations Plans § 436.102 General operations plan format and content. (a... effective date of these guidelines, a general operations 10-year plan which shall consist of two parts, an...

  13. An on-line interface for integrated modeling of wildlife, climate, and society for strategic planning for the Sky Islands

    Science.gov (United States)

    Barron J. Orr; Wolfgang Grunberg; Amanda B. Cockerham; Anne Y. Thwaits; Heather S. Severson; Noah M. D. Lerman; Rachel M. Miller; Michael Haseltine; Barbara J. Morehouse; Jonathan T. Overpeck; Stephen R. Yool; Thomas W. Swetnam; Gary L. Christopherson

    2005-01-01

    The demand for strategic planning tools that account for climate and human influences on wildfire hazard is growing. In response, the University of Arizona, through an EPA STAR Grant has undertaken interdisciplinary research to characterize the human and climate dimensions of wildfire. The resulting Fire-Climate-Society (FCS-1) prototype model developed for Sky Islands...

  14. Designing an Energy Storage System Fuzzy PID Controller for Microgrid Islanded Operation

    Directory of Open Access Journals (Sweden)

    Jin-Hong Jeon

    2011-09-01

    Full Text Available Recently, interest in microgrids, which are composed of distributed generation (DG, distributed storage (DS, and loads, has been growing as a potentially effective clean energy system to mitigate against climate change. The microgrid is operated in the grid-connected mode and the islanded mode according to the conditions of the upstream power grid. The role of the energy storage system (ESS is especially important to maintain constant the frequency and voltage of an islanded microgrid. For this reason, various approaches for ESS control have been put forth. In this paper, a fuzzy PID controller is proposed to improve the frequency control performance of the ESS. This fuzzy PID controller consists of a fuzzy logic controller and a conventional PI controller, connected in series. The fuzzy logic controller has two input signals, and then the output signal of the fuzzy logic controller is the input signal of the conventional PI controller. For comparison of control performance, gains of each PI controller and fuzzy PID controller are tuned by the particle swam optimization (PSO algorithm. In the simulation study, the control performance of the fuzzy PID was also tested under various operating conditions using the PSCAD/EMTDC simulation platform.

  15. A scientific operations plan for the NASA space telescope. [ground support systems, project planning

    Science.gov (United States)

    West, D. K.; Costa, S. R.

    1975-01-01

    A ground system is described which is compatible with the operational requirements of the space telescope. The goal of the ground system is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of space telescope science, or jeopardizing the safety of the space telescope in orbit. The resulting system is able to accomplish this goal through optimum use of existing and planned resources and institutional facilities. Cost is also reduced and efficiency in operation increased by drawing on existing experience in interfacing guest astronomers with spacecraft as well as mission control experience obtained in the operation of present astronomical spacecraft.

  16. Adaptive Protection Scheme for a Distribution System Considering Grid-Connected and Islanded Modes of Operation

    Directory of Open Access Journals (Sweden)

    Yavuz Ates

    2016-05-01

    Full Text Available The renewable energy-based distributed generation (DG implementation in power systems has been an active research area during the last few decades due to several environmental, economic and political factors. Although the integration of DG offers many advantages, several concerns, including protection schemes in systems with the possibility of bi-directional power flow, are raised. Thus, new protection schemes are strongly required in power systems with a significant presence of DG. In this study, an adaptive protection strategy for a distribution system with DG integration is proposed. The proposed strategy considers both grid-connected and islanded operating modes, while the adaptive operation of the protection is dynamically realized considering the availability of DG power production (related to faults or meteorological conditions in each time step. Besides, the modular structure and fast response of the proposed strategy is validated via simulations conducted on the IEEE 13-node test system.

  17. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Danny

    2008-01-01

    The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

  18. Instrumentation and operational plan for geokinetics retort No. 22

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, R.L.; Hommert, P.J.

    1980-04-01

    This report outlines the general plan for the instrumentation and technical direction of a horizontal in siti retorting experiment to be conducted at the Geokinetics, Inc. field site in Uintah County, Utah. Bed preparation has been accomplished by Geokinetics by blasting the retort zone with explosives emplaced in wells drilled from the surface. Downhole instrumentation will consist of approx. 300 thermocouples and 28 combustion gas sampling ports to monitor the movement of the reaction front during the retorting process. Surface instrumentation will provide measurements of flow rates, gas composition, liquid products and other process parameters to monitor the overall operation of the process. The operational plan includes provision for data interpretation and real time material balance calculations in the field, including an evaluation of the effect on processing rates and oil yield due to the use of recycled combusted off gases and changes in rate of injection of inlet gases.

  19. Mission Operations Planning with Preferences: An Empirical Study

    Science.gov (United States)

    Bresina, John L.; Khatib, Lina; McGann, Conor

    2006-01-01

    This paper presents an empirical study of some nonexhaustive approaches to optimizing preferences within the context of constraint-based, mixed-initiative planning for mission operations. This work is motivated by the experience of deploying and operating the MAPGEN (Mixed-initiative Activity Plan GENerator) system for the Mars Exploration Rover Mission. Responsiveness to the user is one of the important requirements for MAPGEN, hence, the additional computation time needed to optimize preferences must be kept within reasonabble bounds. This was the primary motivation for studying non-exhaustive optimization approaches. The specific goals of rhe empirical study are to assess the impact on solution quality of two greedy heuristics used in MAPGEN and to assess the improvement gained by applying a linear programming optimization technique to the final solution.

  20. Operational environmental monitoring plan for the waste isolation pilot plant

    International Nuclear Information System (INIS)

    Mercer, D.D.; Baker, P.L.; Cockman, J.S.; Fischer, N.T.; Flynn, D.T.; Harvill, J.P.; Knudtsen, K.L.; Louderbough, E.T.

    1989-01-01

    This plan defines the scope and extent of the WIPP effluent and environmental monitoring programs during the facility's operational life. It also discusses the quality assurance/quality control programs which ensure that samples collected and the resulting analytical data are representative of actual conditions at the WIPP site. This plan provides a comprehensive description of environmental activities at WIPP, including: a summary of environmental program information, including an update of the status of environmental permits and compliance activities; a description of the WIPP project and its mission; a description of the local environment, including demographics; a summary of applicable standards and regulatory requirements and brief discussions of potential exposure pathways, routine and accidental releases, and their consequences; a summary of the preoperational environmental monitoring and assessment activities and responses to the requirements (Appendix A) and guidelines presented in the ''Radiological Effluent Monitoring and Environmental Surveillance for US DOE Operations.'' 166 refs., 28 figs., 27 tabs

  1. KSC facilities status and planned management operations. [for Shuttle launches

    Science.gov (United States)

    Gray, R. H.; Omalley, T. J.

    1979-01-01

    A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.

  2. 20 Years of Dukovany NPP Operation and Plans for Future

    International Nuclear Information System (INIS)

    Vlcek, J.

    2006-01-01

    NPP Dukovany (4x440MW), the first Czech nuclear power plant and a keystone of Czech Electricity Grid, in 2005 celebrated 20 years of successful operation. In my presentation I am going to speak about next areas. I will start about construction and commissioning history of Dukovany NPP, then I'll put forward what milestones of Dukovany NPP operation were accomplished, I'll say examples about our modernisation and investment activities (including replacement of IandC equipment, modifications for increasing of power and support grid services) and in the end our plans for future. (author)

  3. LANDSAT-D ground segment operations plan, revision A

    Science.gov (United States)

    Evans, B.

    1982-01-01

    The basic concept for the utilization of LANDSAT ground processing resources is described. Only the steady state activities that support normal ground processing are addressed. This ground segment operations plan covers all processing of the multispectral scanner and the processing of thematic mapper through data acquisition and payload correction data generation for the LANDSAT 4 mission. The capabilities embedded in the hardware and software elements are presented from an operations viewpoint. The personnel assignments associated with each functional process and the mechanisms available for controlling the overall data flow are identified.

  4. A High-Speed Train Operation Plan Inspection Simulation Model

    Directory of Open Access Journals (Sweden)

    Yang Rui

    2018-01-01

    Full Text Available We developed a train operation simulation tool to inspect a train operation plan. In applying an improved Petri Net, the train was regarded as a token, and the line and station were regarded as places, respectively, in accordance with the high-speed train operation characteristics and network function. Location change and running information transfer of the high-speed train were realized by customizing a variety of transitions. The model was built based on the concept of component combination, considering the random disturbance in the process of train running. The simulation framework can be generated quickly and the system operation can be completed according to the different test requirements and the required network data. We tested the simulation tool when used for the real-world Wuhan to Guangzhou high-speed line. The results showed that the proposed model can be developed, the simulation results basically coincide with the objective reality, and it can not only test the feasibility of the high-speed train operation plan, but also be used as a support model to develop the simulation platform with more capabilities.

  5. GIS Methodology for Planning Planetary-Rover Operations

    Science.gov (United States)

    Powell, Mark; Norris, Jeffrey; Fox, Jason; Rabe, Kenneth; Shu, I-Hsiang

    2007-01-01

    A document describes a methodology for utilizing image data downlinked from cameras aboard a robotic ground vehicle (rover) on a remote planet for analyzing and planning operations of the vehicle and of any associated spacecraft. Traditionally, the cataloging and presentation of large numbers of downlinked planetary-exploration images have been done by use of two organizational methods: temporal organization and correlation between activity plans and images. In contrast, the present methodology involves spatial indexing of image data by use of the computational discipline of geographic information systems (GIS), which has been maturing in terrestrial applications for decades, but, until now, has not been widely used in support of exploration of remote planets. The use of GIS to catalog data products for analysis is intended to increase efficiency and effectiveness in planning rover operations, just as GIS has proven to be a source of powerful computational tools in such terrestrial endeavors as law enforcement, military strategic planning, surveying, political science, and epidemiology. The use of GIS also satisfies the need for a map-based user interface that is intuitive to rover-activity planners, many of whom are deeply familiar with maps and know how to use them effectively in field geology.

  6. Lessons Learned for Planning and Estimating Operations Support Requirements

    Science.gov (United States)

    Newhouse, Marilyn

    2011-01-01

    Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

  7. Integrating operation design into infrastructure planning to foster robustness of planned water systems

    Science.gov (United States)

    Bertoni, Federica; Giuliani, Matteo; Castelletti, Andrea

    2017-04-01

    Over the past years, many studies have looked at the planning and management of water infrastructure systems as two separate problems, where the dynamic component (i.e., operations) is considered only after the static problem (i.e., planning) has been resolved. Most recent works have started to investigate planning and management as two strictly interconnected faces of the same problem, where the former is solved jointly with the latter in an integrated framework. This brings advantages to multi-purpose water reservoir systems, where several optimal operating strategies exist and similar system designs might perform differently on the long term depending on the considered short-term operating tradeoff. An operationally robust design will be therefore one performing well across multiple feasible tradeoff operating policies. This work aims at studying the interaction between short-term operating strategies and their impacts on long-term structural decisions, when long-lived infrastructures with complex ecological impacts and multi-sectoral demands to satisfy (i.e., reservoirs) are considered. A parametric reinforcement learning approach is adopted for nesting optimization and control yielding to both optimal reservoir design and optimal operational policies for water reservoir systems. The method is demonstrated on a synthetic reservoir that must be designed and operated for ensuring reliable water supply to downstream users. At first, the optimal design capacity derived is compared with the 'no-fail storage' computed through Rippl, a capacity design function that returns the minimum storage needed to satisfy specified water demands without allowing supply shortfall. Then, the optimal reservoir volume is used to simulate the simplified case study under other operating objectives than water supply, in order to assess whether and how the system performance changes. The more robust the infrastructural design, the smaller the difference between the performances of

  8. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  9. 3D Boolean operations in virtual surgical planning.

    Science.gov (United States)

    Charton, Jerome; Laurentjoye, Mathieu; Kim, Youngjun

    2017-10-01

    Boolean operations in computer-aided design or computer graphics are a set of operations (e.g. intersection, union, subtraction) between two objects (e.g. a patient model and an implant model) that are important in performing accurate and reproducible virtual surgical planning. This requires accurate and robust techniques that can handle various types of data, such as a surface extracted from volumetric data, synthetic models, and 3D scan data. This article compares the performance of the proposed method (Boolean operations by a robust, exact, and simple method between two colliding shells (BORES)) and an existing method based on the Visualization Toolkit (VTK). In all tests presented in this article, BORES could handle complex configurations as well as report impossible configurations of the input. In contrast, the VTK implementations were unstable, do not deal with singular edges and coplanar collisions, and have created several defects. The proposed method of Boolean operations, BORES, is efficient and appropriate for virtual surgical planning. Moreover, it is simple and easy to implement. In future work, we will extend the proposed method to handle non-colliding components.

  10. Linear programming models with planned lead times for supply chain operations planning

    NARCIS (Netherlands)

    Spitter, J.M.; Hurkens, C.A.J.; Kok, de A.G.; Lenstra, J.K.; Negenman, E.G.

    2005-01-01

    This paper contributes to the development of models for capacity constrained Supply Chain Operations Planning (SCOP). We focus on production environments with arbitrary supply chain structures. The demand for the end items is assumed to be exogenously determined. We solve the SCOP problem with

  11. Human factors in surgery: from Three Mile Island to the operating room.

    Science.gov (United States)

    D'Addessi, Alessandro; Bongiovanni, Luca; Volpe, Andrea; Pinto, Francesco; Bassi, PierFrancesco

    2009-01-01

    Human factors is a definition that includes the science of understanding the properties of human capability, the application of this understanding to the design and development of systems and services, the art of ensuring their successful applications to a program. The field of human factors traces its origins to the Second World War, but Three Mile Island has been the best example of how groups of people react and make decisions under stress: this nuclear accident was exacerbated by wrong decisions made because the operators were overwhelmed with irrelevant, misleading or incorrect information. Errors and their nature are the same in all human activities. The predisposition for error is so intrinsic to human nature that scientifically it is best considered as inherently biologic. The causes of error in medical care may not be easily generalized. Surgery differs in important ways: most errors occur in the operating room and are technical in nature. Commonly, surgical error has been thought of as the consequence of lack of skill or ability, and is the result of thoughtless actions. Moreover the 'operating theatre' has a unique set of team dynamics: professionals from multiple disciplines are required to work in a closely coordinated fashion. This complex environment provides multiple opportunities for unclear communication, clashing motivations, errors arising not from technical incompetence but from poor interpersonal skills. Surgeons have to work closely with human factors specialists in future studies. By improving processes already in place in many operating rooms, safety will be enhanced and quality increased.

  12. Optimal day-ahead operational planning of microgrids

    International Nuclear Information System (INIS)

    Hosseinnezhad, Vahid; Rafiee, Mansour; Ahmadian, Mohammad; Siano, Pierluigi

    2016-01-01

    Highlights: • A new multi-objective model for optimal day-ahead operational planning of microgrids is proposed. • A new concept called seamlessness is introduced to control the sustainability of microgrid. • A new method is developed to manage the load and renewable energy resources estimation errors. • A new solution based on a combination of numerical and evolutionary approaches is proposed. - Abstract: Providing a cost-efficient, eco-friendly and sustainable energy is one of the main issues in modern societies. In response to this demand, new features of microgrid technology have provided huge potentials while distributing electricity more effectively, economically and securely. Accordingly, this paper presents a new multi-objective generation management model for optimal day-ahead operational planning of medium voltage microgrids. The proposed model optimizes both pollutant emission and operating cost of a microgrid by using multi-objective optimization. Besides, a seamlessness-selective algorithm is integrated into the model, which can be adopted to achieve the desired self-sufficiency level for microgrids along a specified planning horizon. Furthermore, the model is characterized by a reserve-assessment strategy developed to handle the load and renewable energy resources estimation errors. The introduced model is solved using a combination of numerical and evolutionary methods of species-based quantum particle swarm optimization to find the optimal scheduling scheme and minos-based optimal power flow to optimize the operating cost and emission. In addition, the suggested solution approach also incorporates an efficient mechanism for considering energy storage systems and coding the candidate solutions in the evolutionary algorithm. The proposed model is implemented on a test microgrid and is investigated through simulations to study the different aspects of the problem. The results show significant improvements and benefits which are obtained by

  13. Solid waste operations complex engineering verification program plan

    International Nuclear Information System (INIS)

    Bergeson, C.L.

    1994-01-01

    This plan supersedes, but does not replace, the previous Waste Receiving and Processing/Solid Waste Engineering Development Program Plan. In doing this, it does not repeat the basic definitions of the various types or classes of development activities nor provide the rigorous written description of each facility and assign the equipment to development classes. The methodology described in the previous document is still valid and was used to determine the types of verification efforts required. This Engineering Verification Program Plan will be updated on a yearly basis. This EVPP provides programmatic definition of all engineering verification activities for the following SWOC projects: (1) Project W-026 - Waste Receiving and Processing Facility Module 1; (2) Project W-100 - Waste Receiving and Processing Facility Module 2A; (3) Project W-112 - Phase V Storage Facility; and (4) Project W-113 - Solid Waste Retrieval. No engineering verification activities are defined for Project W-112 as no verification work was identified. The Acceptance Test Procedures/Operational Test Procedures will be part of each project's Title III operation test efforts. The ATPs/OTPs are not covered by this EVPP

  14. Phase Zero Contracting Operations-Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2013-10-01

    Annex W plan may utilize strength, weakness, opportunity, threat ( SWOT ) and capability gap analysis techniques. The SWOT method allows the IPE to...accountability and performance, the authors contend that international military organizations will benefit by incorporating Phase Zero Contracting Operations...analytical areas, such as OPLAN analysis , logistics assessments, contracting, and similar professional disciplines. Of note, most organizations do

  15. Continuous improvement of operation and maintenance conditions of french PWR nuclear islands

    International Nuclear Information System (INIS)

    Bitsch, D.

    1985-05-01

    Improvement of the nuclear island design, to facilitate maintenance and working conditions during plant shutdown, has been a subject of particular attention within the French PWR program. Standardization and industrial concentration created an unusually favourable context for approaching this objective. Progress efforts supported by the feedback of actual operating experience were pursued in the areas of plant layout-equipment installation, and on the design and technology of the component themselves. The progress efforts on the design and technology of the components were pursued along several paths including: - the resistance increase of specific parts submitted to various forms of in-service damage, - the reduction of the extent and duration of work during plant outages and - the reduction of the Occupational Radiation Exposure (ORE), one of the most important axes of development, through the appropriate selection of less releasing materials, the implementation of more efficient decontamination systems and by the use of robots

  16. 78 FR 15292 - Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2013-03-11

    ... schedule that governs the Rock Island Railroad and Highway Drawbridge, across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the River Bandits 5K Run/Walk...) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation...

  17. The Royal Naval Medical Services: delivering medical operational capability. the 'black art' of Medical Operational Planning.

    Science.gov (United States)

    Faye, M

    2013-01-01

    This article looks to dispel the mysteries of the 'black art' of Medical Operational Planning whilst giving an overview of activity within the Medical Operational Capability area of Medical Division (Med Div) within Navy Command Headquarters (NCHQ) during a period when the Royal Naval Medical Services (RNMS) have been preparing and reconfiguring medical capability for the future contingent battle spaces. The rolling exercise program has been used to illustrate the ongoing preparations taken by the Medical Operational Capability (Med Op Cap) and the Medical Force Elements to deliver medical capability in the littoral and maritime environments.

  18. Institutional plan -- Institute of Nuclear Power Operations, 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The US nuclear electric utility industry established the Institute of Nuclear Power Operations (INPO) in 1979 to promote the highest levels of safety and reliability -- to promote excellence -- in the operation of its nuclear plants. After its formation, the Institute grew from a handful of on-loan personnel in late 1979 to an established work force of more than 400 permanent and on-loan personnel. INPO's early years were marked by growth and evolution of its programs and organization. The Institute now focuses primarily on the effectiveness and enhancement of established programs and activities. For INPO to carry out its role, it must have the support of its members and participants and a cooperative but independent relationship with the NRC. A basis for that support and cooperation is an understanding of INPO's role. This Institutional Plan is intended to provide that understanding by defining the Institute's role and its major programs. This plan considers the existing and projected needs of the industry and the overall environment in which INPO and its members and participants operate

  19. Runway Operations Planning: A Two-Stage Heuristic Algorithm

    Science.gov (United States)

    Anagnostakis, Ioannis; Clarke, John-Paul

    2003-01-01

    The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, can also be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. This paper introduces a two stage heuristic algorithm for solving the Runway Operations Planning (ROP) problem. In the first stage, sequences of departure class slots and runway crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program with a Branch & Bound algorithm implementation. Preliminary results from this implementation of the two-stage algorithm on real-world traffic data are presented.

  20. Hazardous-waste analysis plan for LLNL operations

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, R.S.

    1982-02-12

    The Lawrence Livermore National Laboratory is involved in many facets of research ranging from nuclear weapons research to advanced Biomedical studies. Approximately 80% of all programs at LLNL generate hazardous waste in one form or another. Aside from producing waste from industrial type operations (oils, solvents, bottom sludges, etc.) many unique and toxic wastes are generated such as phosgene, dioxin (TCDD), radioactive wastes and high explosives. One key to any successful waste management program must address the following: proper identification of the waste, safe handling procedures and proper storage containers and areas. This section of the Waste Management Plan will address methodologies used for the Analysis of Hazardous Waste. In addition to the wastes defined in 40 CFR 261, LLNL and Site 300 also generate radioactive waste not specifically covered by RCRA. However, for completeness, the Waste Analysis Plan will address all hazardous waste.

  1. Using Planning, Scheduling and Execution for Autonomous Mars Rover Operations

    Science.gov (United States)

    Estlin, Tara A.; Gaines, Daniel M.; Chouinard, Caroline M.; Fisher, Forest W.; Castano, Rebecca; Judd, Michele J.; Nesnas, Issa A.

    2006-01-01

    With each new rover mission to Mars, rovers are traveling significantly longer distances. This distance increase raises not only the opportunities for science data collection, but also amplifies the amount of environment and rover state uncertainty that must be handled in rover operations. This paper describes how planning, scheduling and execution techniques can be used onboard a rover to autonomously generate and execute rover activities and in particular to handle new science opportunities that have been identified dynamically. We also discuss some of the particular challenges we face in supporting autonomous rover decision-making. These include interaction with rover navigation and path-planning software and handling large amounts of uncertainty in state and resource estimations. Finally, we describe our experiences in testing this work using several Mars rover prototypes in a realistic environment.

  2. Hazardous-waste analysis plan for LLNL operations

    International Nuclear Information System (INIS)

    Roberts, R.S.

    1982-01-01

    The Lawrence Livermore National Laboratory is involved in many facets of research ranging from nuclear weapons research to advanced Biomedical studies. Approximately 80% of all programs at LLNL generate hazardous waste in one form or another. Aside from producing waste from industrial type operations (oils, solvents, bottom sludges, etc.) many unique and toxic wastes are generated such as phosgene, dioxin (TCDD), radioactive wastes and high explosives. One key to any successful waste management program must address the following: proper identification of the waste, safe handling procedures and proper storage containers and areas. This section of the Waste Management Plan will address methodologies used for the Analysis of Hazardous Waste. In addition to the wastes defined in 40 CFR 261, LLNL and Site 300 also generate radioactive waste not specifically covered by RCRA. However, for completeness, the Waste Analysis Plan will address all hazardous waste

  3. Assessing the vulnerability of the evacuation emergency plan: the case of the El Hierro, Canary Island, Spain

    Science.gov (United States)

    Marrero, J. M.; Garcia, A.; Llinares, A.; Lopez, P.; Ortinz, R.

    2012-04-01

    On July 17, 2011 an unrest was detected in the El Hierro island. A serretian submarine eruption started on October 10th in the southern area of the island, two miles away from La Restinga village. The analysis and interpretation of seismic and deformation data show a large volume of intruded magma. These data also show a high probability of a new vent opening. One of the most complex volcanic hazard scenarios is a new open vent in the El Golfo Valley, in the north slope of the island, where more than 5,000 people live. In this area there are only two possible terrestrial evacuation routes: 1) HI-1 road NE direction, the fastest but most vulnerable one, very near a 1,000 meters height cliff and through a 2 km tunnel with a structural deficiency that had to be closed during high energy periods of seismic activity; and 2) HI-1 road SW direction, a mountain road with many curves, frequent small landslides and fog. The Emergency Plan of the island takes into account the entire evacuation of El Golfo Valley in case of eruption. This process will be carried out by means of an assisted evacuation. The evacuees will be transported to a temporally regrouping shelter outside the valley to organize the transport to Tenerife Island. Only those people who have a second residence or relatives outside the affected area will be able to remain in the island. The evacuation time estimated by authorities for the entire evacuation of El Golfo Valley is of about 4 hours. This is extremely low considering: the complexity of the area; the number of evacuees; the lack of preparedness by the population; and adverse weather conditions. To evaluate the Evacuation Plan vulnerability, a series of evacuation scenarios have been simulated: self-evacuation; assisted evacuation; both terrestrial evacuation routes. The warning time, the response time by the population and the evacuation time have been taken into account.

  4. 30 CFR 250.290 - What operations require approval of the Conceptual Plan?

    Science.gov (United States)

    2010-07-01

    ... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and Information Deepwater Operations Plans (dwop) § 250.290 What operations require approval of the Conceptual Plan? You may... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What operations require approval of the...

  5. 30 CFR 285.620 - What is a Construction and Operations Plan (COP)?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Construction and Operations Plan (COP... Information Requirements Construction and Operations Plan for Commercial Leases § 285.620 What is a Construction and Operations Plan (COP)? The COP describes your construction, operations, and conceptual...

  6. Demographic factors and land-use planning in the small islands of Southern Europe

    Science.gov (United States)

    Soliani, Lamberto; Rossi, Orazio

    1992-09-01

    Since the end of the 1970s, the southern European countries have shown an exceptional reduction in fertility rate. From the highest levels among the developed nations, these countries dropped beneath the substitution rate level: in Greece there is an average of about 1.5 children per woman, and Italy (starting three to four years ago), with 1.3 children per woman, is now the country with the lowest fecundity rate in the world. Land-use planning in southern European small islands therefore requires substantial revision. In the areas where western civilization began, which are highly populated and have a long history, cultural and ethnic aspects of tradition are fundamental to environmental management and to the defense of historical heritage. They also place a strong value on sustaining tourism, the most relevant economic activity, that allows them to survive and maintain a high welfare level. For some decades they have had populations with a marked presence of young people and high emigration rates, but now they are fast becoming dominated by the elderly and must prepare for a period of fast reduction in youth of the workforce, while the peripheral areas of Asia and Africa are entering a sudden demographic growth phase. The demographic structure has also been deeply altered both by previous migrations and by random variations, as usually happens in all small communities. Social services for younger and older people have had to be adapted rapidly, reorganizing high-school management, hospital and health-care structures, in-house assistance, and so on. There is a need to rethink the job market and favor the immigration of highly specialized workers, which is a necessity for technical evolution. Sustainable development is constrained nowadays not only by the scarcity of natural resources, but also by the quality and quantity of human resources. Proper policies for population and land-use planning are highly correlated factors; they have to be considered with respect

  7. Long-term planning in Small Islands Developing States under a changing climate

    Science.gov (United States)

    Rozenberg, J.

    2017-12-01

    This paper presents an analytical framework and decision-making tool tailored to Small Islands Developing States (SIDS), to help them address future climate change challenges. SIDS are a diverse group of countries but all characterized by insularity, geographic remoteness, small economy and population size. SIDS are highly exposed and vulnerable to natural disasters, with average annual losses between 1 and 10% of GDP depending on the country. Vulnerability in SIDS is worsened by poor development planning and the countries' limited ability to respond and manage the risks. Infrastructure is a large share of the fixed capital stock in SIDS, most infrastructure assets are highly critical due to the lack of redundancy in networks and they are often highly vulnerable to natural hazards. Remoteness means that when infrastructure assets are damaged, reconstruction costs are larger than anywhere else, which narrows fiscal space, which in turn leads to deferred maintenance problems and raises the vulnerability to future events. In this context, and with climate change worsening the challenges SIDS face at an uncertain pace and intensity, decision-makers and international donors have to answer difficult questions. Does it make sense to spend increasing amounts of money in infrastructure given the level of debts SIDS face and the economic losses resulting from the regular disruption of infrastructure assets? How should sectors be prioritized? Should long-term plans consider "migration with dignity" as a potential option, especially for low-lying atolls? To help answer these questions, methods for decision-making under deep uncertainty, which rely on large numbers of model runs to identify the vulnerabilities of strategies, are particularly appropriate. The small population size of SIDS and simplicity of their infrastructure networks allows building system models coupled with household surveys and testing a range of different policy options, including unconventional policies

  8. STS operations planning - Current status and outlook for the future

    Science.gov (United States)

    Lee, C. M.

    1981-01-01

    Consideration is given to the status of Space Shuttle operations planning and outlook for the period 1982-94, with some speculations on Shuttle-related space operations early in the next century. Attention is given to the evolution of Shuttle payload capabilities over the next five years. The following list of near-earth environment factors to be exploited by the Space Shuttle is given: (1) easy control of gravity; (2) absence of atmosphere; (3) a comprehensive view of the earth's surface and atmosphere; (4) isolation of hazardous processes from earth biosphere; (5) freely available light, heat and photovoltaic power; (6) an infinite natural reservoir for the disposal of radioactive waste products; and (7) a super-cold heat sink.

  9. Controlled Operation of the Islanded Portion of the International Council on Large Electric Systems (CIGRE Low Voltage Distribution Network

    Directory of Open Access Journals (Sweden)

    Ghullam Mustafa Bhutto

    2017-07-01

    Full Text Available In islanding, a portion of the power network, comprised of the loads and distributed generation (DG units, is isolated from the rest of the power grid and forms a micro grid (MG. In this condition, it becomes essential for the islanded MG to operate in a stable and controlled manner by providing ancillary services. When the MG is cut off from the main grid, the islanding must be detected by the DG units. In this condition it is essential that one of the controllers should be switched to the voltage-frequency (VF control mode. In islanding, the network loses it slack reference and this reference is established by a VF controller. The voltage and the frequency of the islanded MG deviate when disconnected from the transmission grid and these deviations are caused by the load-generation imbalance. The voltage and the frequency of the islanded MG can be restored to the permissible limits if the desired/exceeded amount of active and reactive power is injected/absorbed by the locally available sources in islanded MG. This paper proposes a control strategy which can compensate the voltage and the frequency deviations in the islanded portion of the International Council on Large Electric Systems (CIGRE low voltage distribution network by using advanced power electronics devices such as STATCOMs for Photovoltaic (PV Units and Battery Energy Storage Systems (BESS STATCOMs (for battery units. The selection of the VF controller for the most suitable DG unit of this test network is also presented in this paper, and the effectiveness of the controllers is verified by presenting simulation results using DIgSILENT (DIgSILENT GmbH, Gomaringen, Germany power factory software version 15.0.

  10. Plan for the Initiation of HA-211 Furnace Operations at the Plutonium Finishing Plan (PFP)

    International Nuclear Information System (INIS)

    WILLIS, H.T.

    2000-01-01

    This plan provides a phased approach authorizing the use of three additional muffle furnaces for thermal stabilization. Achievement of Thermal Stabilization mission elements require the installation and startup of three additional muffle furnaces for the thermal stabilization of plutonium and plutonium bearing materials at the Plutonium Finishing Plant (PFP). The release to operate these additional furnaces will require an Activity Based Startup Review. The conduct of the Activity Based Startup Review (ABSR) was approved by Fluor Daniel Hanford on October 15, 1999. This plan has been developed with the objective of identifying those activities needed to guide the controlled startup of five furnaces from authorization to unrestricted operations by adding the HA-211 furnaces in an orderly and safe manner after the approval to Startup has been given

  11. Operation and planning of coordinated natural gas and electricity infrastructures

    Science.gov (United States)

    Zhang, Xiaping

    Natural gas is becoming rapidly the optimal choice for fueling new generating units in electric power system driven by abundant natural gas supplies and environmental regulations that are expected to cause coal-fired generation retirements. The growing reliance on natural gas as a dominant fuel for electricity generation throughout North America has brought the interaction between the natural gas and power grids into sharp focus. The primary concern and motivation of this research is to address the emerging interdependency issues faced by the electric power and natural gas industry. This thesis provides a comprehensive analysis of the interactions between the two systems regarding the short-term operation and long-term infrastructure planning. Natural gas and renewable energy appear complementary in many respects regarding fuel price and availability, environmental impact, resource distribution and dispatchability. In addition, demand response has also held the promise of making a significant contribution to enhance system operations by providing incentives to customers for a more flat load profile. We investigated the coordination between natural gas-fired generation and prevailing nontraditional resources including renewable energy, demand response so as to provide economical options for optimizing the short-term scheduling with the intense natural gas delivery constraints. As the amount and dispatch of gas-fired generation increases, the long-term interdependency issue is whether there is adequate pipeline capacity to provide sufficient gas to natural gas-fired generation during the entire planning horizon while it is widely used outside the power sector. This thesis developed a co-optimization planning model by incorporating the natural gas transportation system into the multi-year resource and transmission system planning problem. This consideration would provide a more comprehensive decision for the investment and accurate assessment for system adequacy and

  12. Planning Pharmacies: An Operational Method to Find the Best Location

    Directory of Open Access Journals (Sweden)

    Simona Tondelli

    2014-05-01

    Full Text Available The theme of the spatial distribution of the pharmacies on the territory is closely connected to urban planning and to services supply. In Italy, the regulatory change that took place in 2012, triggered partly by the need to adhere more to a constantly changing economic system, has led to a revision of the existing situation, consisting both on the method to quantify the pharmacies distribution and on the efficiency of the service. If Law 27/2012 has effectively allowed municipalities to increase the number of pharmacies that they can settle on the municipal territory, it has also started a process of rethinking the logic of pharmacies location and of their catchment areas. In this framework, the present paper aims to discuss the merits of a regulatory evolutions that sparked the process of liberalization of locations, integrating the law guidelines and goals with an operating logic process, usable and useful to translate goals into planning actions in a continuous dialogue between law and territory, constraints and opportunities, equity and accessibility of the care services. Following this logic operations, we have investigated the urban context of Castelfranco Emilia, assuming the location of new offices on the basis of pharmaceutical analyzes.

  13. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  14. Adaptive Droop Control Applied to Voltage-Source Inverters Operating in Grid-Connected and Islanded Modes

    DEFF Research Database (Denmark)

    Vasquez, J. C.; Guerrero, J. M.; Luna, A.

    2009-01-01

    This paper proposes a novel control for voltagesource inverters with the capability to flexibly operate in gridconnected and islanded modes. The control scheme is based on the droop method, which uses some estimated grid parameters such as the voltage and frequency and the magnitude and angle of ...

  15. Design and testing of an armature-reaction-compensated permanent magnet synchronous generator for island operation

    Energy Technology Data Exchange (ETDEWEB)

    Kamiev, K.

    2013-11-01

    At present, permanent magnet synchronous generators (PMSGs) are of great interest. Since they do not have electrical excitation losses, the highly efficient, lightweight and compact PMSGs equipped with damper windings work perfectly when connected to a network. However, in island operation, the generator (or parallel generators) alone is responsible for the building up of the network and maintaining its voltage and reactive power level. Thus, in island operation, a PMSG faces very tight constraints, which are difficult to meet, because the flux produced by the permanent magnets (PMs) is constant and the voltage of the generator cannot be controlled. Traditional electrically excited synchronous generators (EESGs) can easily meet these constraints, because the field winding current is controllable. The main drawback of the conventional EESG is the relatively high excitation loss. This doctoral thesis presents a study of an alternative solution termed as a hybrid excitation synchronous generator (HESG). HESGs are a special class of electrical machines, where the total rotor current linkage is produced by the simultaneous action of two different excitation sources: the electrical and permanent magnet (PM) excitation. An overview of the existing HESGs is given. Several HESGs are introduced and compared with the conventional EESG from technical and economic points of view. In the study, the armature-reaction-compensated permanent magnet synchronous generator with alternated current linkages (ARC-PMSG with ACL) showed a better performance than the other options. Therefore, this machine type is studied in more detail. An electromagnetic design and a thermal analysis are presented. To verify the operation principle and the electromagnetic design, a down-sized prototype of 69 kVA apparent power was built. The experimental results are demonstrated and compared with the predicted ones. A prerequisite for an ARC-PMSG with ACL is an even number of pole pairs (p = 2, 4, 6

  16. The Operation “Big Saturn”: Plan and Implementation Opportunities

    Directory of Open Access Journals (Sweden)

    Ochirov Utash Borisovich

    2015-11-01

    Full Text Available The article analyzes the plan of one of the most important operations of a radical turning point in the course of the Great Patriotic War. Initially, the plan, conceived as the development of Operation “Uranus” and resulted in the encirclement of the 6th Army headed by Field Marshall Paulus at Stalingrad, was called “Saturn”. However, after creating a shortened version of the name “Small Saturn”, it was called “Big Saturn”. The main purpose of “Saturn” was to conduct the strategic offensive with the help of four or five armies from middle Don and Chir towards Rostov-on-Don to withdraw the enemy Army Group “Don” and Army Group “A” from the Caucasus. The enemy army groups consisted of almost a third of the units of the Wehrmacht and its allies, who fought against the Soviet Union and their defeat or delay on the Taman Peninsula where there was no port capacity for rapid evacuation of such a large group of people, equipment and supplies, could significantly change the balance of forces on the Eastern front. Unfortunately, the Сhief of the General Staff of the Red Army Alexander Vasilevsky, who was initially in charge of the “Saturn” operation as the representative of Stavka (General Headquarters, was appointed by Stalin in late November as a coordinator of the Soviet troops, achieving the encirclement of the surrounded Paulus’s grouping. Vasilevsky, using his authority, managed to transfer a significant part of the strategic reserves from the middle Don direction firstly to the Stalingrad direction and then to the Kotelnikovsky direction against unlocking grouping of Manstein. The analysis of the forces of the Stalingrad Front, given in the article, shows that there were enough troops to repulse an attack. The transferred strategic reserves proved to be redundant, and their offensive on Rostov failed, while their usage according to the plan “Saturn” would have led to undeniable success. As a result, Manstein

  17. Responding to climate change impacts in the Sky Island Region: From planning to action

    Science.gov (United States)

    Louise W. Misztal; Gregg Garfin; Lara Hansen

    2013-01-01

    Addressing the increasing effects of climate change on natural resources requires multiple organizations, agencies, and institutions working cooperatively to incorporate climate change into resource management. In the Sky Island region of the southwestern United States and northern Mexico, Sky Island Alliance, a non-governmental organization, has convened a series of...

  18. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  19. Uncertainty and operational considerations in mass prophylaxis workforce planning.

    Science.gov (United States)

    Hupert, Nathaniel; Xiong, Wei; King, Kathleen; Castorena, Michelle; Hawkins, Caitlin; Wu, Cindie; Muckstadt, John A

    2009-12-01

    The public health response to an influenza pandemic or other large-scale health emergency may include mass prophylaxis using multiple points of dispensing (PODs) to deliver countermeasures rapidly to affected populations. Computer models created to date to determine "optimal" staffing levels at PODs typically assume stable patient demand for service. The authors investigated POD function under dynamic and uncertain operational environments. The authors constructed a Monte Carlo simulation model of mass prophylaxis (the Dynamic POD Simulator, or D-PODS) to assess the consequences of nonstationary patient arrival patterns on POD function under a variety of POD layouts and staffing plans. Compared are the performance of a standard POD layout under steady-state and variable patient arrival rates that may mimic real-life variation in patient demand. To achieve similar performance, PODs functioning under nonstationary patient arrival rates require higher staffing levels than would be predicted using the assumption of stationary arrival rates. Furthermore, PODs may develop severe bottlenecks unless staffing levels vary over time to meet changing patient arrival patterns. Efficient POD networks therefore require command and control systems capable of dynamically adjusting intra- and inter-POD staff levels to meet demand. In addition, under real-world operating conditions of heightened uncertainty, fewer large PODs will require a smaller total staff than many small PODs to achieve comparable performance. Modeling environments that capture the effects of fundamental uncertainties in public health disasters are essential for the realistic evaluation of response mechanisms and policies. D-PODS quantifies POD operational efficiency under more realistic conditions than have been modeled previously. The authors' experiments demonstrate that effective POD staffing plans must be responsive to variation and uncertainty in POD arrival patterns. These experiments highlight the need

  20. Shippingport Atomic Power Station Operating Experience, Developments and Future Plans

    International Nuclear Information System (INIS)

    Feinroth, H.; Oldham, G.M.; Stiefel, J.T.

    1963-01-01

    This paper describes and evaluates five years of operation and test of the Shippingport Atomic Power Station and discusses the current technical developments and future plans of the Shippingport programme. This programme is directed towards development of the basic technology of light-water reactors to provide the basis for potential reduction in the costs of nuclear power. The Shippingport reactor plant has operated for over five years and has been found to integrate readily into a utility system either as a base load or peak load unit. Plant component performance has been reliable. There have been no problems in contamination or waste disposal. Access to primary coolant components for maintenance has been good, demonstrating the integrity of fuel elements. Each of the three refuelling operations performed since start-up of Shippingport has required successively less time to accomplish. Recently, the third seed was refuelled in 32 working days, about one quarter the time required for the first refuelling. The formal requirements of personnel training, written administrative procedures, power plant manuals, etc., which have been a vital factor in the successful implementation of the Shippingport programme, are described. The results obtained from the comprehensive test programme carried out at Shippingport are compared with calculations, and good agreement has been obtained. Reactor core performance, plant stability, and response to load changes, fuel element and control rod performance, long-term effects such as corrosion and radiation level build-up, component performance, etc., are discussed in this paper. The principal objective of the current and future programmes of the Shippingport Project in advancing the basic technology of water-cooled reactors is discussed. This programme includes the continued operation of the Shippingport plant, and the development, design, manufacture and test operation of a long-life, highpower density second core - Core 2. At its

  1. Implementing Strategic Planning Capabilities Within the Mars Relay Operations Service

    Science.gov (United States)

    Hy, Franklin; Gladden, Roy; Allard, Dan; Wallick, Michael

    2011-01-01

    Since the Mars Exploration Rovers (MER), Spirit and Opportunity, began their travels across the Martian surface in January of 2004, orbiting spacecraft such as the Mars 2001 Odyssey orbiter have relayed the majority of their collected scientific and operational data to and from Earth. From the beginning of those missions, it was evident that using orbiters to relay data to and from the surface of Mars was a vastly more efficient communications strategy in terms of power consumption and bandwidth compared to direct-to-Earth means. However, the coordination between the various spacecraft, which are largely managed independently and on differing commanding timelines, has always proven to be a challenge. Until recently, the ground operators of all these spacecraft have coordinated the movement of data through this network using a collection of ad hoc human interfaces and various, independent software tools. The Mars Relay Operations Service (MaROS) has been developed to manage the evolving needs of the Mars relay network, and specifically to standardize and integrate the relay planning and coordination data into a centralized infrastructure. This paper explores the journey of developing the MaROS system, from inception to delivery and acceptance by the Mars mission users.

  2. Implementation plan for WRAP Module 1 operational readiness review

    International Nuclear Information System (INIS)

    Irons, L.G.

    1994-01-01

    The Waste Receiving and Processing Module 1 (WRAP 1) will be used to receive, sample, treat, and ship contact-handled (CH) transuranic (TRU), low-level waste (LLW), and low-level mixed waste (LLMW) to storage and disposal sites both on the Hanford site and off-site. The primary mission of WRAP 1 is to characterize and certify CH waste in 55-gallon and 85-gallon drums; and its secondary function is to certify CH waste standard waste boxes (SWB) and boxes of similar size for disposal. The WRAP 1 will provide the capability for examination (including x-ray, visual, and contents sampling), limited treatment, repackaging, and certification of CH suspect-TRU waste in 55-gallon drums retrieved from storage, as well as newly generated CH LLW and CH TRU waste drums. The WRAP 1 will also provide examination (X-ray and visual only) and certification of CH LLW and CH TRU waste in small boxes. The decision to perform an Operational Readiness Review (ORR) was made in accordance with WHC-CM-5-34, Solid Waste Disposal Operations Administration, Section 1.4, Operational Readiness Activities. The ORR will ensure plant and equipment readiness, management and personnel readiness, and management programs readiness for the initial startup of the facility. This implementation plan is provided for defining the conduct of the WHC ORR

  3. ISS Payload Operations: The Need for and Benefit of Responsive Planning

    Science.gov (United States)

    Nahay, Ed; Boster, Mandee

    2000-01-01

    International Space Station (ISS) payload operations are controlled through implementation of a payload operations plan. This plan, which represents the defined approach to payload operations in general, can vary in terms of level of definition. The detailed plan provides the specific sequence and timing of each component of a payload's operations. Such an approach to planning was implemented in the Spacelab program. The responsive plan provides a flexible approach to payload operations through generalization. A responsive approach to planning was implemented in the NASA/Mir Phase 1 program, and was identified as a need during the Skylab program. The current approach to ISS payload operations planning and control tends toward detailed planning, rather than responsive planning. The use of detailed plans provides for the efficient use of limited resources onboard the ISS. It restricts flexibility in payload operations, which is inconsistent with the dynamic nature of the ISS science program, and it restricts crew desires for flexibility and autonomy. Also, detailed planning is manpower intensive. The development and implementation of a responsive plan provides for a more dynamic, more accommodating, and less manpower intensive approach to planning. The science program becomes more dynamic and responsive as the plan provides flexibility to accommodate real-time science accomplishments. Communications limitations and the crew desire for flexibility and autonomy in plan implementation are readily accommodated with responsive planning. Manpower efficiencies are accomplished through a reduction in requirements collection and coordination, plan development, and maintenance. Through examples and assessments, this paper identifies the need to transition from detailed to responsive plans for ISS payload operations. Examples depict specific characteristics of the plans. Assessments identify the following: the means by which responsive plans accommodate the dynamic nature of

  4. 10 CFR 63.161 - Emergency plan for the geologic repository operations area through permanent closure.

    Science.gov (United States)

    2010-01-01

    ... Planning Criteria § 63.161 Emergency plan for the geologic repository operations area through permanent... 10 Energy 2 2010-01-01 2010-01-01 false Emergency plan for the geologic repository operations area... may occur at the geologic repository operations area, at any time before permanent closure and...

  5. 77 FR 24979 - Plan of Operations, Environmental Assessment, Big Thicket National Preserve, Texas

    Science.gov (United States)

    2012-04-26

    ... DEPARTMENT OF THE INTERIOR National Park Service [7148-NZY] Plan of Operations, Environmental.... ACTION: Notice of Availability of a Plan of Operations and Environmental Assessment for a 30-day public... Energy Company (Cimarex), a Plan of Operations to conduct the Rivers Edge 3-D Seismic Survey within the...

  6. Planning in the Continuous Operations Environment of the International Space Station

    Science.gov (United States)

    Maxwell, Theresa; Hagopian, Jeff

    1996-01-01

    The continuous operation planning approach developed for the operations planning of the International Space Station (ISS) is reported on. The approach was designed to be a robust and cost-effective method. It separates ISS planning into two planning functions: long-range planning for a fixed length planning horizon which continually moves forward as ISS operations progress, and short-range planning which takes a small segment of the long-range plan and develops a detailed operations schedule. The continuous approach is compared with the incremental approach, the short and long-range planning functions are described, and the benefits and challenges of implementing a continuous operations planning approach for the ISS are summarized.

  7. Aquifer test plan for the 100-HR-3 Operable Unit

    International Nuclear Information System (INIS)

    Swanson, L.C.; Hartman, M.J.

    1994-01-01

    This test plan directs hydrologic testing activities planned at three existing Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) wells in the 100-HR-3 Operable Unit of the Hanford Site. Three additional wells will be installed near these existing wells and used as additional testing arid observation points during the field activities. Figure 1 shows the locations of the three test sites. A primary objective of the testing program is to provide more detailed hydraulic characterization information for the unconfined aquifer and targeted test sites than provided by the initial reconnaissance-level slug testing of Vukelich. A second objective is to evaluate the applicability of slug interference and dipole flow tests for detailed hydraulic characterization in an unconfined aquifer. This aquifer testing program will also be useful for substantiating hydraulic conductivities reported from previous slug tests and evaluating the effects of filter pack volume/configuration on slug test data. Vukelich recommended additional testing to address the latter two issues

  8. Evaluation of Island and Nearshore Confined Disposal Facility Alternatives, Pascagoula River Harbor Dredged Material Management Plan

    National Research Council Canada - National Science Library

    Bunch, Barry

    2003-01-01

    ...) for the Federal navigation project at Pascagoula, MS. The studies focused on evaluating an option under consideration for the placement of dredged material in an island confined disposal facility (CDF...

  9. Development, operating experience and future plan of ABWR in Japan

    International Nuclear Information System (INIS)

    Ujihara, N.

    2001-01-01

    construction at Hamaoka unit No. 5, Shika unit No. 2, and in plan at Ohma unit No. 1, Shimane unit No. 3. TEPCO is now progressing cost reduction of ABWR with other Japanese utilities. The most significant point is standardization. And we also plan to adopt some design improvements. By using these measures, TEPCO intends a 30% cost reduction of our next ABWR plants, compared with Kashiwazaki-Kariwa No. 6 and 7 of ABWR first plant. We would like to further develop ABWR for moreover cost reduction. And we start to develop ABWR-II as a large-scale (1700 MW(e)) next generation reactor with the aim to commence plant operation in the late 2010s. (author)

  10. 77 FR 25577 - General Provisions; Operating and Strategic Business Planning

    Science.gov (United States)

    2012-05-01

    ... diversity and inclusion within the institution's workforce and management. In addition, the business plan of... simply address diversity, inclusion, affirmative action, and management succession, or that the marketing... included in the human capital plan or marketing plan component of the business plan, the institution can...

  11. The design of system for operative planning of blast furnace production process

    Directory of Open Access Journals (Sweden)

    Malindžák Dušan

    1996-12-01

    Full Text Available A system for operative planning of blast furnace production process is described in the paper. The suggested system is based on the use of a new hierarchy of operative plans, consisting of one-month plan, (7+3 days plan, and 24-hour plan. The system allows smoothing of production process at the blast furnace plant, and at the same time satisfies all requirements of the steel plant regarding to the amount of pig iron.

  12. Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

    Science.gov (United States)

    Dunbar, J. C.

    1972-01-01

    The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

  13. Tactical and operational decisions for operating room planning: efficiency and welfare implications.

    Science.gov (United States)

    Testi, Angela; Tànfani, Elena

    2009-12-01

    In this paper, we evaluate the impact on welfare implications of a 0-1 linear programming model to solve the Operating Room (OR) planning problem, taking a patient perspective. In particular, given a General Surgery Department made up of different surgical sub-specialties sharing a given number of OR block times, the model determines, during a given planning period, the allocation of those blocks to surgical sub-specialties, i.e. the so called Master Surgical Schedule Problem (MSSP), together with the subsets of elective patients to be operated on in each block time, i.e. the so called Surgical Case Assignment Problem (SCAP). The innovation of the model is two-fold. The first is that OR allocation is "optimal" if the available OR blocks are scheduled simultaneously to the proper subspecialty, at the proper time to the proper patient. The second is defining what "proper" means and include that in the objective function. In our approach what is important is not number of patients who can be treated in a given period but how much welfare loss, due to clinical deterioration or other negative consequences related to excessive waiting, can be prevented. In other words we assume a societal perspective in that we focus on "outcome" (health improving or preventing from worsening) rather than on "output" (delivered procedures). The model can be used both to develop weekly OR planning with given resources (operational decision), and to perform "what if" scenario analysis regarding how to increase the amount of OR time available for the entire department (tactical decision). The model performance is verified by applying it to a real scenario, the elective admissions of the General Surgery Department of the San Martino University Hospital in Genova (Italy). Despite the complexity of this NP-hard combinatorial optimization problem, computational results indicate that the model can solve all test problems within 600 s and an average optimality tolerance of less than 0.01%.

  14. Hospital organizational response to the nuclear accident at Three Mile Island: implications for future-oriented disaster planning

    International Nuclear Information System (INIS)

    Maxwell, C.

    1982-01-01

    The 1979 nuclear accident at Three Mile Island (TMI) near Harrisburg, Pennsylvania, caused severe organizational problems for neighboring health care institutions. Dauphin County, just north of TMI, contained four hospitals ranging in distance from 9.5 to 13.5 miles from the stricken plant. Crash plans put into effect within 48 hours of the initial incident successfully reduced hospital census to below 50 per cent of capacity, but retained bedridden and critically ill patients within the risk-zone. No plans existed for area-wide evacuation of hospitalized patients. Future-oriented disaster planning should include resource files of host institution bed capacity and transportation capabilities for the crash evacuation of hospitalized patients during non-traditional disasters

  15. Legal protection against outline operating plans under mining law; Rechtsschutz gegen Rahmenbetriebsplaene im Bergrecht

    Energy Technology Data Exchange (ETDEWEB)

    Schmitz, Holger; Mausch, Marlen [Rechtsanwaltskanzlei Noerr LLP, Berlin (Germany)

    2011-03-15

    In the outline planning for a mining project the question of to what extent the interests of potentially affected surface owners must be taken into account at this early stage of project planning regularly arises. In this contribution the authors explain after a brief introduction to the subject the current jurisdiction of the Federal Administrative Court in respect of the corresponding legal requirements on the outline operating plants, the legal effects of the approval of an outline operating plan and the right of the surface owners to contest the operating plan approval. In addition the permissibility of the initial treatment of owner interests in subsequent special operating plans is described. It is evident that the binding effect of the outline operating plans on the one hand and the transfer of owner interests to special operating plans on the other conflict to a certain extent. (orig.)

  16. Evaluation of possibilities of revitalized HPP Zvornik in island operation conditions

    Directory of Open Access Journals (Sweden)

    Ivanović Milan

    2011-01-01

    Full Text Available This paper presents the evaluation of revitalized units in HPP Zvornik for islanding, with proposed parameters and characteristics. For the selected scenario and specific disturbances, dynamic response of aggregates have been identified for sufficiently long period, by using the computer program Primcont. Achieved results show the ability of HPP Zvornik islanding, for one scenario considered. However, the complexity of this problem requires its general quantitative treatment, which was emphasized at the end of the paper.

  17. 30 CFR 250.111 - Who oversees operations under my welding plan?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Who oversees operations under my welding plan... § 250.111 Who oversees operations under my welding plan? A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person must ensure that each welder is...

  18. 36 CFR 228.4 - Plan of operations-notice of intent-requirements.

    Science.gov (United States)

    2010-07-01

    ... meet the requirements for environmental protection in § 228.8. (d) The plan of operations shall cover... disturbance not covered by the initial plan. (e) At any time during operations under an approved plan of...), resulting in varying degrees of disturbance to vegetative resources, soil, water, air, or wildlife. The...

  19. 76 FR 43237 - Patient Protection and Affordable Care Act; Establishment of Consumer Operated and Oriented Plan...

    Science.gov (United States)

    2011-07-20

    ... have a choice of health plans to fit their needs. Exchanges will give individuals and small businesses... Protection and Affordable Care Act; Establishment of Consumer Operated and Oriented Plan (CO-OP) Program... implement the Consumer Operated and Oriented Plan (CO-OP) program, which provides loans to foster the...

  20. Operational plan of Iran saffron’s branding

    Directory of Open Access Journals (Sweden)

    Abolfazl Masoomzadeh Zavareh

    2014-03-01

    Full Text Available Despite the extensive production and export of saffron in Iran, we have no strong and credible brand of Iranian saffron in global market. In other words, the absence of strong brands in the global market has made almost no name of Iran in these markets. Thus, it is useful to aware of the importance of branding for export crops such as saffron and exploring the solutions of leading brands using in the global market. The present study with regard to theoretical foundations, comparative studies and by using the opinions of saffron industry experts via in-depth interview and questionnaire, have addressed the challenges facing the industry, and Using SWOT matrix for formulating branding strategies and operational plans. The results of the study show that branding in the industry is so weak and has a lot of weaknesses and threats. Therefore, to develop branding in the industry, four main strategy categories were presented. By using these strategies we can guarantee the improvement in the industry.

  1. Survivability on the Island of Spice: The Development of the UH-60 Blackhawk and Its Baptism of Fire in Operation Urgent Fury

    Science.gov (United States)

    2015-06-12

    SURVIVABILITY ON THE ISLAND OF SPICE : THE DEVELOPMENT OF THE UH-60 BLACKHAWK AND ITS BAPTISM OF FIRE IN OPERATION URGENT FURY......THESIS APPROVAL PAGE Name of Candidate: Major Matthew G. Easley Thesis Title: Survivability on the Island of Spice : The Development of the UH

  2. Mixer pump long term operations plan for Tank 241-SY-101 mitigation

    International Nuclear Information System (INIS)

    Irwin, J.J.

    1994-01-01

    This document provides the general Operations Plan for performance of the mixer pump long term operations for Tank 241-SY-101 mitigation of gas retention and periodic release in Tank 101-SY. This operations plan will utilize a 112 kW (150 hp) mixing pump to agitate/suspend the particulates in the tank

  3. Proposed energy conservation contingency plan: emergency restrictions on advertising lighting. Authorities, need, rationale, and operation

    Energy Technology Data Exchange (ETDEWEB)

    1977-04-01

    The emergency restrictions on advertising lighting proposed in Energy Conservation Contingency Plan No. 5 of 1977 are presented. A statement is given on the need for rationale and operation of the Contingency Plan.

  4. State of Montana ITS/CVO business plan : intelligent transportation system commercial vehicle operations

    Science.gov (United States)

    1998-01-01

    This plans purpose is to encourage coordinated, efficient and safe commercial vehicle operations throughout Montana, and to promote inter-agency and regional cooperation as ITS/CVO projects are developed and deployed. The Plan discusses Montana...

  5. The case for investing in family planning in the Pacific: costs and benefits of reducing unmet need for contraception in Vanuatu and the Solomon Islands

    Science.gov (United States)

    2013-01-01

    Background Unmet need for family planning in the Pacific is among the highest in the world. Better understanding of required investments and associated benefits of increased access to family planning in the Pacific may assist prioritisation and funding. Methods We modelled the costs and associated health, demographic and economic impacts of reducing unmet need for family planning between 2010–2025 in Vanuatu and the Solomon Islands. Baseline data were obtained from census reports, Demographic and Health Surveys, and UN agency reports. Using a demographic modelling program we compared a scenario of “no change in unmet need” with two distinct scenarios: 1) all family planning needs met by 2020; and, 2) all needs met by 2050. Results Meeting family planning needs by 2020 would increase prevalence of modern contraception in 2025 from 36.8 to 65.5% in Vanuatu and 28.5 to 37.6% in the Solomon Islands. Between 2010–2025 the average annual number of unintended pregnancies would decline by 68% in Vanuatu and 50% in the Solomon Islands, and high-risk births would fall by more than 20%, averting 2,573 maternal and infant deaths. Total fertility rates would fall from 4.1 to 2.2 in Vanuatu and 3.5 in the Solomon Islands, contributing to slowed population growth and lower dependency ratios. The direct cost of reducing unmet need by 2020 was estimated to be $5.19 million for Vanuatu and $3.36 million for the Solomon Islands between 2010–2025. Preventing unintended pregnancies would save $112 million in health and education expenditure. Conclusions In small island developing states such as Vanuatu and the Solomon Islands, increasing investment in family planning would contribute to improved maternal and infant outcomes and substantial public sector savings. PMID:23758783

  6. WP3 Prototype development for operational planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Kristoffersen, T.; Meibom, P. (Technical Univ. of Denmark. Risoe DTU (Denmark)); Apfelbeck, J.; Barth, R.; Brand, H. (IER, Univ. of Stuttgart (Germany))

    2008-04-15

    This report documents the model development carried out in work package 3 in the SUPWIND project. It was decided to focus on the estimation of the need for reserve power, and on the reservation of reserve power by TSOs. Reserve power is needed to cover deviations from the day-ahead forecasts of electricity load and wind power production, and to cover forced outages of power plants and transmission lines. Work has been carried out to include load uncertainty and forced outages in the two main components of the Wilmar Planning tool namely the Scenario Tree Tool and the Joint Market Model. This work is documented in chapter 1 and 2. The inclusion of load uncertainty and forced outages in the Scenario Tree Tool enables calculation of the demand for reserve power depending on the forecast horizon. The algorithm is given in Section 3.1. The design of a modified version of the Joint Market Model enabling estimation of the optimal amount of reserve power to reserve day-ahead before the actual operation hour is documented in Section 3.2. With regard to the evaluation of a power system, its ability to cope with extreme events is crucial to be investigated. Chapter 4 gives a definition of such extreme events. Further, the methodology to identify extreme events on the basis of the existing tools is described. Within the SUPWIND consortium there has been an interest in using the Joint Market Model to model smaller parts of a power system but with more detailed representation of the transmission and distribution grid. Chapter 5 documents this work. (author)

  7. Sustainability Criteria for Planning, Constructing, and Operating Contingency Bases

    Science.gov (United States)

    2012-05-22

    common PREREQ 1 Walkable Streets yes Planning, Desi gn, Construction, OaM Medium use areas. Plan careft,j!y to accommodate simftar functions in the...apjly the specific LEED·ND criteria. Pay special attention to roads that connect LSA ~ife support areas) to common Walkable Streets yes Planning... Walkable Streets  Intent: ►To promote transportation efficiency. ►To promote walking by providing: • Safe •Appealing •Comfortable street

  8. Turnaround Operations Analysis for OTV. Volume 3: Technology Development Plan

    Science.gov (United States)

    1988-01-01

    An integrated technology development plan for the technologies required to process both GBOTVs and SBOTVs are described. The plan includes definition of the tests and experiments to be accomplished on the ground, in a Space Shuttle Sortie Mission, on an Expendable Launch Vehicle, or at the Space Station as a Technology Development Mission (TDM). The plan reflects and accommodates current and projected research and technology programs where appropriate.

  9. Ontological Models to Support Planning Operations, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. A fundamental requirement...

  10. Ontological Models to Support Planning Operations, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. However, the major...

  11. Vulnerability to Urban Heat Island in São Paulo Municipality: An Approach to Support the Mitigation Measures Implementation in Urban Planning

    Directory of Open Access Journals (Sweden)

    Juliana Siqueira-Gay

    2017-10-01

    Full Text Available In the practice of urban and environmental planning, especially in the context of adaptation to environmental changes, there is a demand for studies that integrate social, economic and environmental information of the population and related risk. Particularly in large urban centers, waterproofing and verticalization have the potential to increase local air temperature, triggering the phenomenon of heat islands. Therefore, this phenomenon has side effects such as public health problems, pollution and changes in the air circulation. In view of the risks and consequences of the urban heat islands, this paper aims to analyze the priority areas for implementing measures to mitigate the effects of the urban heat islands phenomenon in São Paulo City (Brazil. A vulnerability index was proposed considering the social and environmental dimensions, relating the capacity of adaptation, sensitivity and exposure to the occurrence of the phenomenon of urban heat islands. Besides that, measures to mitigate the effects associated with heat islands in urban planning were identified. The central regions are critical for exposure and the outskirts, for adaptive capacity and sensitivity, both considered priorities for the implementation of mitigation measures. In addition, strategies such as implementation and conservation of green spaces, preservation of water bodies, urban design change, as well as use of materials with high reflectance are also listed and partially foreseen in the Municipal Strategic Master Plan to mitigate the effects of urban heat island.

  12. Setting the right incentives for global planning and operations

    NARCIS (Netherlands)

    Norde, Henk; Ozen, Ulas; Slikker, Marco

    We study incentive issues seen in a firm performing global planning and manufacturing, and local demand management. The stochastic demands in local markets are best observed by the regional business units, and the firm relies on the business units’ forecasts for planning of global manufacturing

  13. Residential proximity and cognition of risk at Three Mile Island: implications for evacuation planning

    International Nuclear Information System (INIS)

    Cutter, S.L.

    1984-01-01

    This paper specifically examines the relationship between risk cognition and distance from the source of the threat or hazard using an experienced population, the residents in the vicinity of the Three Mile Island plant. Survey data from 1980 and 1982 are used to assess the effect of distance from the plant on the cognition of risk. Risk, as used in this paper, is defined as both an estimate of the likelihood of accidents, frequency of accidents and an evaluation of the future use of nuclear power to generate electricity. It is suggested that residents living closer to the plant will be more aware of the risks that those living farther away. It is also suggested that there will be some differences between the cognition of societal risks from the production of power from nuclear sources and the more salient risks associated with the production of power from the Three Mile Island plant

  14. 36 CFR 292.66 - Operating plan requirements-outstanding mineral rights.

    Science.gov (United States)

    2010-07-01

    ... products, insecticides, pesticides, and herbicides that will be used during the mineral operation and the...-site and off-site damage to natural resources resulting from mineral operations. The plan must: (i...

  15. COMPOEX Technology to Assist Leaders in Planning and Executing Campaigns in Complex Operational Environments

    National Research Council Canada - National Science Library

    Kott, Alexander; Corpac, Peter S

    2007-01-01

    ... in a complex operational environment. Leaders must understand the operational environment, develop campaign plans that include multiple lines of effort such as security, governance, political-economic development, rule of law and employ...

  16. Network Operations Support Plan for the Spot 2 mission (revision 1)

    Science.gov (United States)

    Werbitzky, Victor

    1989-01-01

    The purpose of this Network Operations Support Plan (NOSP) is to indicate operational procedures and ground equipment configurations for the SPOT 2 mission. The provisions in this document take precedence over procedures or configurations in other documents.

  17. Engineering Task Plan to Expand the Environmental Operational Envelope of Core Sampling

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan authorizes the development of an Alternative Generation and Analysis (AGA). The AGA will determine how to expand the environmental operating envelope during core sampling operations

  18. 77 FR 421 - Drawbridge Operation Regulation; Long Island, New York Inland Waterway From East Rockaway Inlet...

    Science.gov (United States)

    2012-01-05

    ..., mile 6.1, across Narrow Bay, between Smith Point and Fire Island, New York. This temporary final rule..., (76 FR 60733) and that work was unexpectedly delayed. This rule provides a time extension so that the rehabilitation can be completed in the shortest possible time frame. Without this rule the work would have to be...

  19. Optimizing droop coefficients for minimum cost operation of islanded micro-grids

    DEFF Research Database (Denmark)

    Sanseverino, E. Riva; Tran, Q. T.T.; Zizzo, G.

    2017-01-01

    This paper shows how minimum cost energy management can be carried out for islanded micro-grids considering an expanded state that also includes the system's frequency. Each of the configurations outputted by the energy management system at each hour are indeed technically sound and coherent from...

  20. Oceanic gamefish/Skylab project field operating plan for operations 4, 5 August. [in Gulf of Mexico

    Science.gov (United States)

    1973-01-01

    The operation plans are presented for the oceanic Gamefish/Skylab Experiment 240, which was conducted to obtain fish catch data for the northeast area of the Gulf of Mexico. The plans for surface measurements, aerial observations, and communications are included.

  1. Gas characterization system operation, maintenance, and calibration plan

    International Nuclear Information System (INIS)

    Tate, D.D.

    1996-01-01

    This document details the responsibilities and requirements for operation, maintenance, and calibration of the Gas Characterization Systems (GCS) analytical instrumentation. It further, defines the division of responsibility between the Characterization Monitoring Development organization and Tank Farms Operations

  2. 18 CFR 376.209 - Procedures during periods of emergency requiring activation of the Continuity of Operations Plan.

    Science.gov (United States)

    2010-04-01

    ... periods of emergency requiring activation of the Continuity of Operations Plan. 376.209 Section 376.209... of the Continuity of Operations Plan. (a)(1) The Commission's Continuity of Operations Plan is...) During periods when the Continuity of Operations Plan is activated, the Commission will continue to act...

  3. Procurement planning in oil refining industries considering blending operations

    DEFF Research Database (Denmark)

    Oddsdottir, Thordis Anna; Grunow, Martin; Akkerman, Renzo

    2013-01-01

    This paper addresses procurement planning in oil refining, which has until now only had limited attention in the literature. We introduce a mixed integer nonlinear programming (MINLP) model and develop a novel two-stage solution approach, which aims at computational efficiency while addressing...... parameters than in previous literature. The developed approach is tested using historical data from Statoil A/S as well as through a comprehensive numerical analysis. The approach generates a feasible procurement plan within acceptable computation time, is able to quickly adjust an existing plan to take...

  4. An Operations Planning Tool Fit for the Fortune 500

    Science.gov (United States)

    Casserly, Michael D.

    2011-01-01

    This article presents an example of the ways in which many large districts are working to dispel long-held myths about inefficient and unresponsive operations, particularly in operational areas, such as transportation, purchasing, food services, and information technology (IT). Determined to improve both academically and operationally, leaders in…

  5. The Impact of Law and Lawyers on Operations and Planning

    National Research Council Canada - National Science Library

    Hollingshead, Christopher M

    2007-01-01

    .... It is important for the SJA to fully participate in the development of plans, guidance, and ROE, but it is the commander's responsibility to ensure that these documents do not become so over drafted...

  6. Operational antecedents of integrated patient planning in hospitals

    NARCIS (Netherlands)

    Drupsteen, Justin; van der Vaart, T.; van Donk, Dirk

    2016-01-01

    Purpose - Hospitals struggle to integrate the planning from different departments; resulting in unacceptable waiting times for patients. The literature mainly addresses general, organizational factors inhibiting or enabling integration and omits important factors stemming from the care delivery

  7. Integrated Ground Operations Demonstration Units Testing Plans and Status

    Science.gov (United States)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  8. Migrant and Seasonal Agricultural Worker Protection Act: Forestry contractors' model operating plan

    Science.gov (United States)

    Dan Bremer

    2007-01-01

    The Model Operating Plan for forestry contractors is a voluntary plan for compliance with the Migrant and Seasonal Agricultural Worker Protection Act (MSPA) of 1983, with amendments passed in 1996 and 1997. This plan is designed as a guide for forestry contractors who wish to comply with all federal, state, and local rules and regulations that govern their employer/...

  9. MSFC Doppler Lidar Science experiments and operations plans for 1981 airborne test flight

    Science.gov (United States)

    Fichtl, G. H.; Bilbro, J. W.; Kaufman, J. W.

    1981-01-01

    The flight experiment and operations plans for the Doppler Lidar System (DLS) are provided. Application of DLS to the study of severe storms and local weather penomena is addressed. Test plans involve 66 hours of flight time. Plans also include ground based severe storm and local weather data acquisition.

  10. Climate changes and water resource planning: WIZ, an operational tool

    Directory of Open Access Journals (Sweden)

    Bernardo Mazzanti

    2013-09-01

    Full Text Available The institutional activity of the Arno River Basin Authority is focused on two strategical planning processes: the River Basin Management Plan, according to 2000/60/CE European Direcitve, and the Flood Management Plan, according to 2007/60/CE European Directive. Both plans contain most of the contents of Arno River Basin Plan, developed after the italian law L. 183/89, and are tackling with a global approach the management of extreme flood events and water budget problems. In this context, the evaluation of climate change impact on the water cycle is extremely relevant. Therefore the Arno River Basin Authority is engaged to analyze the impact of climate changes on water status, regarding as main reference the IPCC AR4 report e their connected forecasting scenarios. The involvement in a LIFE+ project (WIZ – WaterIZe Spatial Planning is the framework for a sample of preliminary evaluations, with the aim to include in the next updated edition of River Basin Management Plan new adapting measures (more than mitigation actions, in order to fight the negative impact of climate change on the possibility to achieve the Water Framework Directive’s quality objectives. Focusing the attention on the Lower Arno valley (Valdarno Inferiore and taking into account as simplifying hypothesis a linear correlation between groundwater recharge and total rainfall fluctuations, the effects of actual and projected climate changes are evaluated. For each water abstraction area, the potential variation of available groundwater for antropic use (in cubic meter per year is estimated, showing a decreasing trend ranging, with a high spatial variability, in a 5-10% interval. Due the increase of water demand and the distribution network losses, even such a percentage of decreasing potential recharge should be carefully evaluated; without water savings measures and investments on the renovation of distribution networks, an increase of the typical summer water scarcity crisis

  11. Comparison of implementation of selected TMI action plan requirements on operating plants designed by Babcock and Wilcox

    International Nuclear Information System (INIS)

    Thoma, J.O.

    1984-05-01

    This report provides the results of a study conducted by the US Nuclear Regulatory Commission staff to compare the degree to which eight Babcock and Wilcox (B and W) designed licensed nuclear power plants have complied with the requirements in NUREG-0737, Clarification of TMI Action Plan Requirements. The eight licensed operating plants examined are as follows: Arkansas Nuclear One Unit 1 (ANO-1), Crystal River Unit 3, Davis Besse, Oconee Units 1, 2, and 3, Rancho Seco, and Three Mile Island Unit 1 (TMI-1). The purpose of this audit was to establish the progress of the TMI-1 licensee, General Public Utilities (GPU) Nuclear Corporation, in completing the long-term requirements in NUREG-0737 relative to the other B and W licensees examined

  12. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    Science.gov (United States)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  13. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  14. Implications of outsourcing on operations planning : findings from the pharmaceutical industry

    NARCIS (Netherlands)

    Boulaksil, Y.; Fransoo, J.C.

    2010-01-01

    Purpose – The purpose of this paper is to understand the implications of outsourcing at the operational planning level, i.e. how the operational planning function is complicated owing to the strategic outsourcing decisions that have been made in the past. Design/methodology/approach – First, a

  15. How Innovation Theory Can Contribute to the Military Operations Planning Process

    DEFF Research Database (Denmark)

    Heltberg, Anna Therese; Dahl, Kåre

    The research study considers how the application of innovation theory might contribute to military staff work planning processes and bring new perspectives to operational models of analysis such as NATO’s Comprehensive Operations Planning Directive (COPD) and the Danish Field Manual III....

  16. 77 FR 37283 - General Provisions; Operating and Strategic Business Planning; Effective Date

    Science.gov (United States)

    2012-06-21

    ... directors of each Farm Credit System institution to adopt an operational and strategic business plan to... FARM CREDIT ADMINISTRATION 12 CFR Part 618 RIN 3052-AC66 General Provisions; Operating and Strategic Business Planning; Effective Date AGENCY: Farm Credit Administration. ACTION: Notice of effective...

  17. Plant-life extension planning for an operating LMFBR

    International Nuclear Information System (INIS)

    King, R.W.

    1985-01-01

    The study concluded that continued EBR-II operation is certainly feasible for well beyond 10 more years, and that continued demonstration of the unique inherent safety and operability features of a pool-type liquid-metal-cooled reactor and the demonstration of a reasonable operating lifetime are very important and will provide invaluable information for the design and development of the next generation nuclear power plants

  18. Ganges Valley Aerosol Experiment: Science and Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Kotamarthi, VR

    2010-06-21

    emissions; and dust. The extended AMF deployment will enable measurements under different regimes of the climate and aerosol abundance—in the wet monsoon period with low aerosol loading; in the dry, hot summer with aerosols dispersed throughout the atmospheric column; and in the cool, dry winter with aerosols confined mostly to the boundary later and mid-troposphere. Each regime, in addition, has its own distinct radiative and atmospheric dynamic drivers. The aircraft operational phase will assist in characterizing the aerosols at times when they have been observed to be at the highest concentrations. A number of agencies in India will collaborate with the proposed field study and provide support in terms of planning, aircraft measurements, and surface sites. The high concentration of aerosols in the upper Ganges Valley, together with hypotheses involving several possible mechanisms with direct impacts on the hydrologic cycle of the region, gives us a unique opportunity to generate data sets that will be useful both in understanding the processes at work and in providing answers regarding the effects of aerosols on climate in a region where the perturbation is the highest.

  19. Equilibrium and non-equilibrium dynamics simultaneously operate in the Galápagos islands.

    Science.gov (United States)

    Valente, Luis M; Phillimore, Albert B; Etienne, Rampal S

    2015-08-01

    Island biotas emerge from the interplay between colonisation, speciation and extinction and are often the scene of spectacular adaptive radiations. A common assumption is that insular diversity is at a dynamic equilibrium, but for remote islands, such as Hawaii or Galápagos, this idea remains untested. Here, we reconstruct the temporal accumulation of terrestrial bird species of the Galápagos using a novel phylogenetic method that estimates rates of biota assembly for an entire community. We show that species richness on the archipelago is in an ascending phase and does not tend towards equilibrium. The majority of the avifauna diversifies at a slow rate, without detectable ecological limits. However, Darwin's finches form an exception: they rapidly reach a carrying capacity and subsequently follow a coalescent-like diversification process. Together, these results suggest that avian diversity of remote islands is rising, and challenge the mutual exclusivity of the non-equilibrium and equilibrium ecological paradigms. © 2015 The Authors Ecology Letters published by John Wiley & Sons Ltd and CNRS.

  20. An Operational Framework for Insecticide Resistance Management Planning.

    Science.gov (United States)

    Chanda, Emmanuel; Thomsen, Edward K; Musapa, Mulenga; Kamuliwo, Mulakwa; Brogdon, William G; Norris, Douglas E; Masaninga, Freddie; Wirtz, Robert; Sikaala, Chadwick H; Muleba, Mbanga; Craig, Allen; Govere, John M; Ranson, Hilary; Hemingway, Janet; Seyoum, Aklilu; Macdonald, Michael B; Coleman, Michael

    2016-05-01

    Arthropod vectors transmit organisms that cause many emerging and reemerging diseases, and their control is reliant mainly on the use of chemical insecticides. Only a few classes of insecticides are available for public health use, and the increased spread of insecticide resistance is a major threat to sustainable disease control. The primary strategy for mitigating the detrimental effects of insecticide resistance is the development of an insecticide resistance management plan. However, few examples exist to show how to implement such plans programmatically. We describe the formulation and implementation of a resistance management plan for mosquito vectors of human disease in Zambia. We also discuss challenges, steps taken to address the challenges, and directions for the future.

  1. 36 CFR 9.10 - Plan of operations approval.

    Science.gov (United States)

    2010-07-01

    ... injure the ecological or cultural resources of the unit. No new surface mining will be permitted under..., or loss of wildlife habitat, not required for development of the claim; or (5) Where the operations... of cultural resources within the area to be affected by mining operations. Whenever National Register...

  2. SSS-A attitude control prelaunch analysis and operations plan

    Science.gov (United States)

    Werking, R. D.; Beck, J.; Gardner, D.; Moyer, P.; Plett, M.

    1971-01-01

    A description of the attitude control support being supplied by the Mission and Data Operations Directorate is presented. Descriptions of the computer programs being used to support the mission for attitude determination, prediction, control, and definitive attitude processing are included. In addition, descriptions of the operating procedures which will be used to accomplish mission objectives are provided.

  3. Use of sales and operations planning in small and medium-sized enterprises

    Directory of Open Access Journals (Sweden)

    Michał Adamczak

    2013-03-01

    Full Text Available Background: Increasing competitiveness in the market, customer expectations related to the shortening of the deadlines and the reduction of prices of products and services force companies to improve the efficiency of internal processes. The integration of planning process is one of possible ways to achieve this aim. The integration of planning processes by the use of SOP model (Sales and Operations Planning is a method to implement this idea. The study allowed to identify ways to implement the process of sales and operations planning in small and medium-sized enterprises. Material and methods: The study was conducted in companies from different industries. The research method was in-depth interviews conducted with managers of companies or persons occupying management positions in the organizational process of implementing sales and operations planning. Results: During the survey, 10 companies were asked about the use of sales and operations planning, its elements and organizational aspects of its development, by the company. Conclusions: The use of sales and operations plan is closely dependent on the size of the company and its localization in the supply chain. Small enterprises are not interested in the integration of the planning process due to the small scale of operations and the centralization of decision-making process. Medium-sized enterprises, due to the increased complexity of the processes of planning, see the benefits of their integration in the SOP model.

  4. Job training planning and design for process plant operators

    Energy Technology Data Exchange (ETDEWEB)

    Wirstad, J.

    1983-01-01

    A method is presented by which process plant operators for nuclear power plants are trained in Sweden. It works by a top-down method of systems analysis which can be integrated into the analysis, specification, and design of the process automation system. The training methods can also be adapted to existing automation systems and operating schedules. The author's method is based on the principle that training programs should be based on job requirements, e.g. operator tasks in common, less frequent, and rare operating conditions. Procedures have been tested for the following steps: Job analysis, analysis of knowledge and experience required, analysis of operator training requirements, set-up and organisation of the training programme, achievement control, evaluation of the training programme.

  5. Job training planning and design for process plant operators

    International Nuclear Information System (INIS)

    Wirstad, J.

    1983-01-01

    A method is presented by which process plant operators for nuclear power plants are trained in Sweden. It works by a top-down method of systems analysis which can be integrated into the analysis, specification, and design of the process automation system. The training methods can also be adapted to existing automation systems and operating schedules. The author's method is based on the principle that training programs should be based on job requirements, e.g. operator tasks in common, less frequent, and rare operating conditions. Procedures have been tested for the following steps: Job analysis, analysis of knowledge and experience required, analysis of operator training requirements, set-up and organisation of the training programme, achievement control, evaluation of the training programme. (orig./HP) [de

  6. Work-in-process clearing in supply chain operations planning

    NARCIS (Netherlands)

    Selcuk, B.; Fransoo, J.C.; Kok, de A.G.

    2008-01-01

    In this study we provide insights into the effectiveness of the clearing function concept in a hierarchical planning context. The clearing function is a mathematical representation of the relation between the Work-In-Process (WIP) and the throughput of a production process. We use it in a

  7. Planning of outsourced operations in pharmaceutical supply chains

    NARCIS (Netherlands)

    Boulaksil, Y.

    2010-01-01

    In this dissertation, we focus on the planning and control of supply chains where part of the supply chain is outsourced to a contract manufacturer(s). Supply Chain Management deals with the integration of business processes from end-customers through original suppliers that provide products,

  8. Indiana intelligent transportation systems commercial vehicle operations business plan

    Science.gov (United States)

    1997-12-31

    This business plan was developed by the Motor Carrier Services (MCS) division of the Indiana Department of Revenue. It is the result of a nine month study of the various state departments and agencies that directly and indirectly support the intersta...

  9. Guide for Developing High-Quality School Emergency Operations Plans

    Science.gov (United States)

    Office of Safe and Healthy Students, US Department of Education, 2013

    2013-01-01

    Each school day, our nation's schools are entrusted to provide a safe and healthy learning environment for approximately 55 million elementary and secondary school students in public and nonpublic schools. In collaboration with their local government and community partners, schools can take steps to plan for these potential emergencies through the…

  10. Security's role in morgue operations: needed--a foolproof plan.

    Science.gov (United States)

    White, John M

    2012-01-01

    If handling the remains of dead patients is a responsibility of your security department, or you are being pressured to take on the role because of budget cuts, the need to anticipate and plan for complications which may arise is critical, the author points out.

  11. 78 FR 68469 - Draft General Management Plan/Wilderness Study/Environmental Impact Statement, Channel Islands...

    Science.gov (United States)

    2013-11-14

    ... decision making, which will allow managers to effectively address future opportunities and problems, such... will serve as the basis for future detailed management documents, such as five-year strategic plans and...

  12. Searching for Order Within Chaos: Complexity Theorys Implications to Intelligence Support During Joint Operational Planning

    Science.gov (United States)

    2017-06-09

    joint operational planning . 15. SUBJECT TERMS Complexity Theory , Complex Systems Theory , Complex Adaptive Systems, Dynamical Systems, Joint...complexity theory to analyze military problems and increase joint staff understanding of the operational environment during joint operational planning ?” the...13). Complex Systems Theory : “the study of the behavior of [complex adaptive] systems” (Ilachinski 2004, 4). For the purpose of this thesis there is

  13. ARM MJO Investigation Experiment on Gan Island (AMIE-Gan) Science Plan

    Energy Technology Data Exchange (ETDEWEB)

    Long, CL; Del Genio, A; Deng, M; Fu, X; Gustafson, W; Houze, R; Jakob, C; Jensen, M; Johnson, R; Liu, X; Luke, E; May, P; McFarlane, S; Minnis, P; Schumacher, C; Vogelmann, A; Wang, Y; Webster, P; Xie, S; Zhang, C

    2011-04-11

    The overarching campaign, which includes the ARM Mobile Facility 2 (AMF2) deployment in conjunction with the Dynamics of the Madden-Julian Oscillation (DYNAMO) and the Cooperative Indian Ocean experiment on intraseasonal variability in the Year 2011 (CINDY2011) campaigns, is designed to test several current hypotheses regarding the mechanisms responsible for Madden-Julian Oscillation (MJO) initiation and propagation in the Indian Ocean area. The synergy between the proposed AMF2 deployment with DYNAMO/CINDY2011, and the corresponding funded experiment on Manus, combine for an overarching ARM MJO Investigation Experiment (AMIE) with two components: AMF2 on Gan Island in the Indian Ocean (AMIE-Gan), where the MJO initiates and starts its eastward propagation; and the ARM Manus site (AMIE-Manus), which is in the general area where the MJO usually starts to weaken in climate models. AMIE-Gan will provide measurements of particular interest to Atmospheric System Research (ASR) researchers relevant to improving the representation of MJO initiation in climate models. The framework of DYNAMO/CINDY2011 includes two proposed island-based sites and two ship-based locations forming a square pattern with sonde profiles and scanning precipitation and cloud radars at both island and ship sites. These data will be used to produce a Variational Analysis data set coinciding with the one produced for AMIE-Manus. The synergy between AMIE-Manus and AMIE-Gan will allow studies of the initiation, propagation, and evolution of the convective cloud population within the framework of the MJO. As with AMIE-Manus, AMIE-Gan/DYNAMO also includes a significant modeling component geared toward improving the representation of MJO initiation and propagation in climate and forecast models. This campaign involves the deployment of the second, marine-capable, AMF; all of the included measurement systems; and especially the scanning and vertically pointing radars. The campaign will include sonde

  14. ESSOPE: Towards S/C operations with reactive schedule planning

    Science.gov (United States)

    Wheadon, J.

    1993-01-01

    The ESSOPE is a prototype front-end tool running on a Sun workstation and interfacing to ESOC's MSSS spacecraft control system for the exchange of telecommand requests (to MSSS) and telemetry reports (from MSSS). ESSOPE combines an operations Planner-Scheduler, with a Schedule Execution Control function. Using an internal 'model' of the spacecraft, the Planner generates a schedule based on utilization requests for a variety of payload services by a community of Olympus users, and incorporating certain housekeeping operations. Conflicts based on operational constraints are automatically resolved, by employing one of several available strategies. The schedule is passed to the execution function which drives MSSS to perform it. When the schedule can no longer be met, either because the operator interferes (by delays or changes of requirements), or because ESSOPE has recognized some spacecraft anomalies, the Planner produces a modified schedule maintaining the on-going procedures as far as consistent with the new constraints or requirements.

  15. Comprehensive, Integrated Reconstruction Operations: We Need a Master Plan

    National Research Council Canada - National Science Library

    Dosa, Brian L

    2007-01-01

    The U.S. military has historically played a critical role during post-conflict stability operations, contributing to the overall goal of achieving long term security and securing our strategic interests...

  16. Report: EPA Needs to Improve Continuity of Operations Planning

    Science.gov (United States)

    Report #10-P-0017, October 27, 2009. EPA has limited assurance that it can successfully maintain continuity of operations and execute its mission essential functions during a significant national event such as a pandemic influenza outbreak.

  17. Strategic Munitions Planning in Non-Conventional Asymmetric Operations

    Science.gov (United States)

    2010-04-01

    Conventional Asymmetric Operations RTO-MP-SAS-081 16 - 3 with a clearly structured, sized and located military force. The principles of Lanchester ...stockpiles and calculated munitions requirements. REFERENCES [1] Prague Summit Declaration, November 2002. [2] J. Fletcher, The Lanchester Legacy... Lanchester battles, Journal of the Operational Research Society, Vol. 50 No. 3, March 1999. [13] W. Freeman, A Study of Ammunition Consumption, Master of

  18. Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

    Science.gov (United States)

    Hitz, F. R.

    1976-01-01

    The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

  19. A development plan for the south-eastern part of Pag island with an emphasis on olive-growing

    Directory of Open Access Journals (Sweden)

    Vesna Koščak Miočić-Stošić

    2014-01-01

    Full Text Available Regardless of the fact that the traditional usage of rural landscapes was agricultural, a degradation of landscape values, as well as an onset of natural succession, occur due to contemporary lifestyle. This can lead to negative effects regarding land-use change. This paper focuses on the south-eastern part of Pag island and explores the possibilities for the revitalisation of its neglected areas by envisioning its future development as an olive-growing region. The final goal was to define a planning procedure framework which would enable the creation of a strategic vision to be transformed into a comprehensive spatial development strategy for the research area. This area encompasses the territory between Kaštela in the north-west and the Pag’s bridge in the south-east which administratively belongs to the Zadar County and includes the Town of Pag, and the Kolan and Povljana municipalities. Olive-growing has been recognized as the strategic choice for development because of its tradition in the area and the potential integration with other relatable activities. Based on the SWOT analysis, an appropriate mission, a vision and strategic goals were defined for developing Pag as an olive-growing region. Further landscape planning methods included (1 the Lynch mapping analysis, (2 the Forman and Godron landscape ecology analysis and (3 the landscape pattern analysis. The results were then used together with digital orthophoto imagery to overlay and analyse relevant information. Hand drawings as well as AutoCAD, ArcGIS and image editing computer programmes were used in the process. This analytical phase was then followed by the development of several alternative spatial zonings, diagrams and concepts based on a preferable neighbourhood matrix and the activity sizing table. The planning process resulted in a concept for spatial development of the research area which would enable the implementation of the strategic vision. The main goal of this

  20. AIRSAR South American deployment: Operation plan, version 3.0

    Science.gov (United States)

    Kobrick, M.

    1993-01-01

    The United States National Aeronautics and Space Administration (NASA) and the Brazilian Commission for Space Activities (COBAE) are undertaking a joint experiment involving NASA's DC-8 research aircraft and the Airborne Synthetic Aperture Radar (AIRSAR) system during late May and June 1993. The research areas motivating these activities are: (1) fundamental research in the role of soils, vegetation, and hydrology in the global carbon cycle; and (2) in cooperation with South American scientists, airborne remote sensing research for the upcoming NASA Spaceborne Imaging Radar (SIR)-C/X-SAR flights on the Space Shuttle. A flight schedule and plans for the deployment that were developed are included. Maps of the site locations and schematic indications of flight routes and dates, plots showing swath locations derived from the flight requests and generated by flight planning software, and, most importantly, a calendar showing which sites will be imaged each day are included.

  1. Planning of outsourced operations in pharmaceutical supply chains

    OpenAIRE

    Boulaksil, Y.

    2010-01-01

    In this dissertation, we focus on the planning and control of supply chains where part of the supply chain is outsourced to a contract manufacturer(s). Supply Chain Management deals with the integration of business processes from end-customers through original suppliers that provide products, services and information that add value for customers (Cooper et al., 1997). In a narrow sense, a supply chain can be ‘owned’ by one large company with several sites, often located in different countries...

  2. Automated Planning and Scheduling for Space Mission Operations

    Science.gov (United States)

    Chien, Steve; Jonsson, Ari; Knight, Russell

    2005-01-01

    Research Trends: a) Finite-capacity scheduling under more complex constraints and increased problem dimensionality (subcontracting, overtime, lot splitting, inventory, etc.) b) Integrated planning and scheduling. c) Mixed-initiative frameworks. d) Management of uncertainty (proactive and reactive). e) Autonomous agent architectures and distributed production management. e) Integration of machine learning capabilities. f) Wider scope of applications: 1) analysis of supplier/buyer protocols & tradeoffs; 2) integration of strategic & tactical decision-making; and 3) enterprise integration.

  3. COMPARISON OF TWO METHODS OF OPERATING THEATRE PLANNING: APPLICATION IN BELGIAN HOSPITAL

    Institute of Scientific and Technical Information of China (English)

    Sondes CHAABANE; Nadine MESKENS; Alain GUINET; Marius LAURENT

    2008-01-01

    Operating Theatre is the centre of the hospital management's efforts. It constitutes the most expensive sector with more than 10% of the intended operating budget of the hospital. To reduce the costs while maintaining a good quality of care, one of the solutions is to improve the existent planning and scheduling methods by improving the services and surgical specialty coordination or finding the best estimation of surgical case durations. The other solution is to construct an effective surgical case plan and schedule. The operating theatre planning and scheduling is the two important steps, which aim to make a surgical case programming with an objective of obtaining a realizable and efficient surgical case schedule. This paper focuses on the first step, the operating theatre planning problem. Two planning methods are introduced and compared. Real data of a Belgian university hospital "Tivoli" are used for the experiments.

  4. Benefits to blood banks of a sales and operations planning process.

    Science.gov (United States)

    Keal, Donald A; Hebert, Phil

    2010-12-01

    A formal sales and operations planning (S&OP) process is a decision making and communication process that balances supply and demand while integrating all business operational components with customer-focused business plans that links high level strategic plans to day-to-day operations. Furthermore, S&OP can assist in managing change across the organization as it provides the opportunity to be proactive in the face of problems and opportunities while establishing a plan for everyone to follow. Some of the key outcomes from a robust S&OP process in blood banking would include: higher customer satisfaction (donors and health care providers), balanced inventory across product lines and customers, more stable production rates and higher productivity, more cooperation across the entire operation, and timely updates to the business plan resulting in better forecasting and fewer surprises that negatively impact the bottom line. © 2010 American Association of Blood Banks.

  5. [Philanthropic hospitals and the operation of provider-owned health plans in Brazil].

    Science.gov (United States)

    Lima, Sheyla Maria Lemos; Portela, Margareth C; Ugá, Maria Alicia Dominguez; Barbosa, Pedro Ribeiro; Gerschman, Silvia; Vasconcellos, Miguel Murat

    2007-02-01

    To describe the management performance of philanthropic hospitals that operate their own health plans, in comparison with philanthropic hospitals as a whole in Brazil. The managerial structures of philanthropic hospitals that operated their own health plans were compared with those seen in a representative group from the philanthropic hospital sector, in six dimensions: management and planning, economics and finance, human resources, technical services, logistics services and information technology. Data from a random sample of 69 hospitals within the philanthropic hospital sector and 94 philanthropic hospitals that operate their own health plans were evaluated. In both cases, only the hospitals with less than 599 beds were included. The results identified for the hospitals that operate their own health plans were more positive in all the managerial dimensions compared. In particular, the economics and finance and information technology dimensions were highlighted, for which more than 50% of the hospitals that operated their own health plans presented almost all the conditions considered. The philanthropic hospital sector is important in providing services to the Brazilian Health System (SUS). The challenges in maintaining and developing these hospitals impose the need to find alternatives. Stimulation of a public-private partnership in this segment, by means of operating provider-owned health plans or providing services to other health plans that work together with SUS, is a field that deserves more in-depth analysis.

  6. [Preoperative imaging/operation planning for liver surgery].

    Science.gov (United States)

    Schoening, W N; Denecke, T; Neumann, U P

    2015-12-01

    The currently established standard for planning liver surgery is multistage contrast media-enhanced multidetector computed tomography (CM-CT), which as a rule enables an appropriate resection planning, e.g. a precise identification and localization of primary and secondary liver tumors as well as the anatomical relation to extrahepatic and/or intrahepatic vascular and biliary structures. Furthermore, CM-CT enables the measurement of tumor volume, total liver volume and residual liver volume after resection. Under the condition of normal liver function a residual liver volume of 25 % is nowadays considered sufficient and safe. Recent studies in patients with liver metastases of colorectal cancer showed a clear staging advantage of contrast media-enhanced magnetic resonance imaging (CM-MRI) versus CM-CT. In addition, most recent data showed that the use of liver-specific MRI contrast media further increases the sensitivity and specificity of detection of liver metastases. This imaging technology seems to lead closer to the ideal "one stop shopping" diagnostic tool in preoperative planning of liver resection.

  7. Two-Stage Load Shedding for Secondary Control in Hierarchical Operation of Islanded Microgrids

    DEFF Research Database (Denmark)

    Zhou, Quan; Li, Zhiyi; Wu, Qiuwei

    2018-01-01

    A two-stage load shedding scheme is presented to cope with the severe power deficit caused by microgrid islanding. Coordinated with the fast response of inverter-based distributed energy resources (DERs), load shedding at each stage and the resulting power flow redistribution are estimated....... The first stage of load shedding will cease rapid frequency decline in which the measured frequency deviation is employed to guide the load shedding level and process. Once a new steady-state is reached, the second stage is activated, which performs load shedding according to the priorities of loads...

  8. Multibeam Mapping and Remotely Operated Vehicle Exploration of the Puerto Rico and Virgin Islands Region

    Science.gov (United States)

    Coleman, D. F.; Ten Brink, U. S.; Armstrong, R.; Chaytor, J. D.; Demopoulos, A. W.

    2013-12-01

    During October 2013, an ocean exploration project took place off the coast of Puerto Rico and the Virgin Islands. This project, a collaborative effort between the Ocean Exploration Trust, the US Geological Survey, the University of Puerto Rico at Mayaguez, the University of Rhode Island, and NOAA, was aimed at exploring regions of the US exclusive economic zone (EEZ) south of the Puerto Rico Trench axis, and north of Mona Island, Puerto Rico, and the US and British Virgin Islands, and portions of the Anegada Passage. The research vessel E/V Nautilus and the Hercules/Argus ROV system were used to expand the multibeam sonar bathymetric data coverage of the region, collect high definition video footage of seafloor features, and to collect biological and geological samples along selected transects. Particular areas of interest for targeted ROV dives included: the region where a large M7.2 1918 earthquake produced a tsunami that struck northwestern corner of Puerto Rico; a transect up the vertical wall of the Mona Rift (4000 to 1500 m depth); transects along the Septentrional fault system; dives in areas of suspected fluid flow through faults, fissures, and offshore Karst systems associated with the tilted carbonate platform north of Puerto Rico; dives in the Anegada Passage at the entry points for surface Atlantic waters that circulate into the Caribbean; and in regions to investigate and date sedimentary features offset by fault motion and potential tsunamigenic landslides. Biological sampling of many deep-sea benthic organisms (including deep water corals) have never been attempted before in this area. These samples are being used to understand more about the diversity, population dynamics, genetics, and habitat connectivity of these communities, and to provide an age constraint for disturbed sedimentary features. Until this cruise, the location and distribution of deep coral habitats in the US Caribbean was largely unknown. The available information on benthic

  9. Operational Risk Management: Increasing Mission Effectiveness Through Improved Planning and Execution of Joint Operations

    National Research Council Canada - National Science Library

    Beckvonpeccoz, Stephen

    1997-01-01

    .... This deficiency should be remedied with the adoption of Operational Risk Management (ORM), an existing process which would provide operational commanders a tool for making smarter risk decisions...

  10. A motion-planning method for dexterous hand operating a tool based on bionic analysis

    Directory of Open Access Journals (Sweden)

    Wei Bo

    2017-01-01

    Full Text Available In order to meet the needs of robot’s operating tools for different types and sizes, the dexterous hand is studied by many scientific research institutions. However, the large number of joints in a dexterous hand leads to the difficulty of motion planning. Aiming at this problem, this paper proposes a planning method abased on BPNN inspired by human hands. Firstly, this paper analyses the structure and function of the human hand and summarizes its typical strategy of operation. Secondly, based on the manual operation strategy, the tools are classified according to the shape and the operation mode of the dexterous hand is presented. Thirdly, the BPNN is used to train the humanoid operation, and then output the operation plan. Finally, the simulating experiments of grasping simple tools and operating complex tools are made by MATLAB and ADAMS. The simulation verifies the effectiveness of this method.

  11. Strategic and Operational Plan Implementation of Seaports (Utilization Jeddah Port

    Directory of Open Access Journals (Sweden)

    Akram Elentably

    2015-12-01

    Full Text Available The Port of Jeddah (Port released the initial version of this Strategic Plan in 2006. It was developed by Port staff, along with input, as a five-year rolling plan designed to guide the Port’s future development while keeping in mind the needs of our tenants, local community members and stakeholders, and the nation. This is the second update to the Strategic Plan since its initial release. While the Port’s overarching principles – commitment to environmental stewardship, addressing tenant needs, goods movement, economic development, and security – have remained largely unchanged, it is important for us to adapt our strategies to meet the challenges of an ever changing local and global environment. The Port is among the world’s premier ports and is a critical hub for global trade. This prominence brings with it responsibilities and expectations for the highest possible standards for efficiency, safety and security, and environmental leadership. The Port is the nation’s busiest container port and part of the world’s busiest port complex, handling 3.7 million twenty-foot equivalent units in 2013. Global trade and goods movement is Western kingdom of Saudi Arabia’s strongest industries in terms of jobs and economic activity. The Port of Jeddah powers these industries, handling almost more than a quarter of the cargo that enters the kingdom of Saudi Arabia annually. Through the Port’s activities, a lot of jobs are created in western kingdom of Saudi Arabia and over five hundred thousand nationwide. In order to maintain our position among the world’ the kingdom of Saudi Arabia premier ports, the Port is continually addressing the demands for providing modern and efficient cargo handling terminals as well as transportation and infrastructure projects. Protecting one of the nation’s most vital economic hubs is also an ongoing challenge. Finally, promoting a sustainable “grow green” philosophy and ensuring that we are the leader

  12. A Guidebook on Grid Interconnection and Islanded Operation of Mini-Grid Power Systems Up to 200 kW

    Energy Technology Data Exchange (ETDEWEB)

    Greacen, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Engel, Richard [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Quetchenbach, Thomas [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-04-01

    A Guidebook on Grid Interconnection and Islanded Operation of Mini-Grid Power Systems Up to 200 kW is intended to help meet the widespread need for guidance, standards, and procedures for interconnecting mini-grids with the central electric grid as rural electrification advances in developing countries, bringing these once separate power systems together. The guidebook aims to help owners and operators of renewable energy mini-grids understand the technical options available, safety and reliability issues, and engineering and administrative costs of different choices for grid interconnection. The guidebook is intentionally brief but includes a number of appendices that point the reader to additional resources for indepth information. Not included in the scope of the guidebook are policy concerns about “who pays for what,” how tariffs should be set, or other financial issues that are also paramount when “the little grid connects to the big grid.”

  13. 76 FR 5774 - Planning and Establishment of Consumer Operated and Oriented Plan Program; Request for Comments...

    Science.gov (United States)

    2011-02-02

    ...) of the Affordable Care Act directs the Secretary to establish a program to foster, through grants and... in feasibility studies, business plans, and marketing plans provided by prospective applicants before... are the advantages and disadvantages of a regional qualified nonprofit issuer or a regional federation...

  14. Operation REDWING Commander Task Group 7.3, Operation Plan Number 1-56.

    Science.gov (United States)

    1956-01-24

    Radio Circuit Description SI. Tab B - Radio Frequency Plan 7:: Tab C - Aircraft Radio Frequency List Tab D - Radio Circuit Diagram Appendix 2 - Radio...Frequency Plan C Aircraft Radio Frequency List D Radio Circuit Diagrams 2 - Radio Call Signs and Code ’Words N. ROHI5BE2 E LCDR, U. S. Navy Flag...appendix. TABS: A Radio Circuit Description B Radio Frequency Plan C Aircraft Radio Frequency List D Radio Circuit Diagrams Joint Task Force SEVEN Task

  15. Developing an instrument for assessing fidelity of motivational care planning: The Aboriginal and Islander Mental health initiative adherence scale.

    Science.gov (United States)

    Prowse, Phuong-Tu; Nagel, Tricia

    2014-01-01

    The aim of this study was to design and trial an Adherence Scale to measure fidelity of Motivational Care Planning (MCP) within a clinical trial. This culturally adapted therapy MCP uses a client centered holistic approach that emphasises family and culture to motivate healthy life style changes. The Motivational Care Planning-Adherence Scale (MCP-AS) was developed through consultation with Aboriginal and Islander Mental Health Initiative (AIMhi) Indigenous and non-Indigenous trainers, and review of MCP training resources. The resultant ten-item scale incorporates a 9-Point Likert Scale with a supporting protocol manual and uses objective, behaviourally anchored criteria for each scale point. A fidelity assessor piloted the tool through analysis of four audio-recordings of MCP (conducted by Indigenous researchers within a study in remote communities in Northern Australia). File audits of the remote therapy sessions were utilised as an additional source of information. A Gold Standard Motivational Care Planning training video was also assessed using the MCP-AS. The Motivational Care Planning-Adherence Scale contains items measuring both process and content of therapy sessions. This scale was used successfully to assess therapy through observation of audio or video-recorded sessions and review of clinical notes. Treatment fidelity measured by the MCP-AS within the pilot study indicated high fidelity ratings. Ratings were high across the three domains of rapport, motivation, and self-management with especially high ratings for positive feedback and engagement, review of stressors and goal setting. The Motivational Care Planning-Adherence Scale has the potential to provide a measure of quality of delivery of Motivation Care Planning. The pilot findings suggest that despite challenges within the remote Indigenous community setting, Indigenous therapists delivered therapy that was of high fidelity. While developed as a research tool, the scale has the potential to

  16. Integrated payload and mission planning, phase 3. Volume 3: Ground real-time mission operations

    Science.gov (United States)

    White, W. J.

    1977-01-01

    The payloads tentatively planned to fly on the first two Spacelab missions were analyzed to examine the cost relationships of providing mission operations support from onboard vs the ground-based Payload Operations Control Center (POCC). The quantitative results indicate that use of a POCC, with data processing capability, to support real-time mission operations is the most cost effective case.

  17. Coordinated control of smart microgrid during and after islanding operation to prevent under frequency load shedding using energy storage system

    International Nuclear Information System (INIS)

    Koohi-Kamali, Sam; Rahim, Nasrudin Abd

    2016-01-01

    Highlights: • A new power management system is proposed. • The novel idea of using energy storage systems to prevent under frequency load shedding is presented. • A method to estimate rate of change of frequency in islanding mode and to dispatch battery plant is introduced. • Two effective outer control loops are proposed for governor to synchronize the microgrid with main grid. • Solar photovoltaic and battery plants bring the voltage regulation ancillary service for microgrid. - Abstract: This work presents a smart microgrid consisting of diesel, photovoltaic (PV), and battery storage plants. One of the key features of smart grid is to provide a redundant high quality power for the consumers. In islanded microgrid, the under frequency and/or voltage collapse, caused by power deficiency, can lead to power outage. The current practice is to shed the load demand until the frequency and voltage are restored. However, the redundancy in supplying power has no meaning as long as the loads are shed. The main objective of this paper is to propose a power management system (PMS) that protects the microgrid against the load shedding. PMS is able to control the microgrid in both centralized and decentralized fashions. To prevent under frequency load shedding (UFLS), this work proposes using battery energy storage system (BESS) to compensate for the power mismatch in the islanded microgrid. A method is presented to estimate the rate of change of frequency and to calculate the power deficiency. The approximated value is exploited as the set-point to dispatch BESS. PV and battery plants are supposed to share the reactive power demand proportionally and thus regulate the voltage at the load bus. This work also suggests two outer control loops, namely, frequency restoration loop (FRL) and difference angle compensator (DAC). These loops ensure microgrid smooth transition from islanded mode to grid-connected mode. The microgrid is configured to investigate the effective

  18. Planning of Operating Rooms at the Danish National Hospital

    OpenAIRE

    Taltavull Mercadal, Ignasi

    2016-01-01

    The irnport.ance of t.he rnanagerial aspects of hospitals can be seen in hvo mam aspects. On one hand, healt.h spending has a big irnpact on the budget. of t.he count.ries. For instance, it accounted for 11% of GDP in Demnark dnring 2014. JVloreover, it is estimated that around of 10-30% of thcse expenditures is destined to surgical facilities. Therefore, as expense centres, an cfficient pla.nning of opernting rooms is highly important to reduce costs ancl optimizc rcsou...

  19. Implementation plan for the Operations Center Upgrade project

    International Nuclear Information System (INIS)

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed

  20. Operational freight carrier planning basic concepts, optimization models and advanced memetic algorithms

    CERN Document Server

    Schönberger, Jörn

    2005-01-01

    The modern freight carrier business requires a sophisticated automatic decision support in order to ensure the efficiency and reliability and therefore the survival of transport service providers. This book addresses these challenges and provides generic decision models for the short-term operations planning as well as advanced metaheuristics to obtain efficient operation plans. After a thorough analysis of the operations planning in the freight carrier business, decision models are derived. Their suitability is proven within a large number of numerical experiments, in which a new class of hybrid genetic search approaches demonstrate their appropriateness.

  1. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  2. 36 CFR 9.36 - Plan of operations.

    Science.gov (United States)

    2010-07-01

    ...; (8) The proposed drilling depth, and the estimated tops of important geologic markers; (9) The... regulations; (16) Background information, including: (i) A description of the natural, cultural, social and... indirect effects of the operations on the unit's natural, cultural, social, and economic environment; (iii...

  3. Reframing Afghanistan: Is Operational Planning Linked to History and Culture?

    Science.gov (United States)

    2012-05-17

    on what the insurgent groups were doing and not enough on the environment in which they were operating - within the ecology of the people...and blood money are devices frequently used to limit violence among rival families. Pashtunwali is a code that limits anarchy among a fractious but

  4. 22 CFR Appendix I to Part 211 - Operational Plan

    Science.gov (United States)

    2010-04-01

    ... for the selection of the geographical areas where programs will be carried out; the calculation of... above, as for a nonemergency program. Thus, all of the above basic issues set forth in the Operational... World Food Program) emergency request normally requires more Mission involvement in program design and...

  5. 7 CFR 761.104 - Developing the farm operating plan.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS GENERAL PROGRAM ADMINISTRATION Supervised Credit § 761.104... following priorities: (i) The applicant or borrower's own production records for the previous 3 years; (ii) The per-acre actual production history of the crops produced by the farming operation used to...

  6. IMP-J attitude control prelaunch analysis and operations plan

    Science.gov (United States)

    Hooper, H. L.; Mckendrew, J. B.; Repass, G. D.

    1973-01-01

    A description of the attitude control support being supplied for the Explorer 50 mission is given. Included in the document are descriptions of the computer programs being used to support attitude determination, prediction, and control for the mission and descriptions of the operating procedures that will be used to accomplish mission objectives.

  7. Operation plan for the data 100/LARS terminal system

    Science.gov (United States)

    Bowen, A. J., Jr.

    1980-01-01

    The Data 100/LARS terminal system provides an interface for processing on the IBM 3031 computer system at Purdue University's Laboratory for Applications of Remote Sensing. The environment in which the system is operated and supported is discussed. The general support responsibilities, procedural mechanisms, and training established for the benefit of the system users are defined.

  8. Shuffling the Operational Deck: Future Requirements for the Plans, Operations, Medical Intelligence (POMI) Community

    Science.gov (United States)

    2011-04-11

    countries. PepsiCo, IBM and Nike are current examples of the so-called "game planning" approach to succession and talent ~anagement.21 Annual...Rothwell and associates, inc .; a full-service consulting Succession Planning finn provides other partner industries with the value of strategic

  9. Multi-annual energy plan for Reunion Island. Adopted by the plenary assembly of the Regional Council of Reunion

    International Nuclear Information System (INIS)

    2015-01-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for Reunion Island (Indian Ocean). It establishes the priority actions for all energy sources with respect to supply control, supply diversification, supply security, development of storage facilities and networks. It covers a first 3-years period (2016-2018) followed by a second 5-years period (2019-2023)

  10. Multi-annual energy plan. Part relating to the Ponant islands. The Energy transition for green growth

    International Nuclear Information System (INIS)

    2016-01-01

    The multi-annual energy plan aims at completing the transition towards an energy system which is more efficient, less wasteful, more diverse and therefore more resilient. It reaffirms France's commitment to reducing energy consumption, particularly energy from fossil fuels. The future of France's energy sector lies in striking a harmonious balance between different energy sources. These strategic decisions will help to meet France's objectives to keep greenhouse gas emissions to a minimum in line with its commitments to the EU and to the Paris Climate Agreement, to protect human health and the environment and to ensure access to energy at a reasonable cost whilst stimulating economic activity and employment. This document is the multi-annual energy plan for the inhabited and non-interconnected Ponant Islands (Ouessant, Molene, Sein). It establishes the priority actions for all energy sources with respect to demand control, supply diversification, supply security, supply and demand management, renewal of production means. It covers a first 3-years period (2016-2018) followed by a second 5-years period (2019-2023)

  11. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    Science.gov (United States)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  12. Operations of and Future Plans for the Pierre Auger Observatory

    Energy Technology Data Exchange (ETDEWEB)

    Abraham, : J.; Abreu, P.; Aglietta, M.; Aguirre, C.; Ahn, E.J.; Allard, D.; Allekotte, I.; Allen, J.; Alvarez-Muniz, J.; Ambrosio, M.; Anchordoqui, L.

    2009-06-01

    These are presentations to be presented at the 31st International Cosmic Ray Conference, in Lodz, Poland during July 2009. It consists of the following presentations: (1) Performance and operation of the Surface Detectors of the Pierre Auger Observatory; (2) Extension of the Pierre Auger Observatory using high-elevation fluorescence telescopes (HEAT); (3) AMIGA - Auger Muons and Infill for the Ground Array of the Pierre Auger Observatory; (4) Radio detection of Cosmic Rays at the southern Auger Observatory; (5) Hardware Developments for the AMIGA enhancement at the Pierre Auger Observatory; (6) A simulation of the fluorescence detectors of the Pierre Auger Observatory using GEANT 4; (7) Education and Public Outreach at the Pierre Auger Observatory; (8) BATATA: A device to characterize the punch-through observed in underground muon detectors and to operate as a prototype for AMIGA; and (9) Progress with the Northern Part of the Pierre Auger Observatory.

  13. Planning, Investment, Construction and Operation of Rail Transit in Beijing

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    In Beijing, the rail transit firstly came into existence in the mid 1960s and was officially put into operation for civil use in the early 1980s. It has entered a period of rapid development since 2001, with thanks to the coming of the Olympic Games in 2008, and has been playing a more and more important role in the passenger transport of Beijing since then on, as a key part of the public transportation. Based on a resume on the evolution of rail transit development in Beijing, this paper analyzes the mechanism of policy-making, the mode of investment and financing, the procedure of construction, and the management of operation of rail transit, all of which ensure its rapid development and effective performance.

  14. TOWARDS FINANCING AND PLANNING ROAD SAFETY AUDIT OPERATIONS IN NIGERIA

    Directory of Open Access Journals (Sweden)

    Joshua Adetunji ODELEYE, M.Sc.

    2000-01-01

    Finally, this paper suggests commissioning of a National Road Research Fund, with a view to developing an efficient road safety audit operational system. Also, the introduction of private initiatives and a Community-based Approach in road administration, as well as decentralization of road administration framework at all levels, will greatly help “engineer out” potentially unsafe features across Nigerian roads, towards a better road traffic environment in the 21st century.

  15. JWST Wavefront Sensing and Control: Operations Plans, Demonstrations, and Status

    Science.gov (United States)

    Perrin, Marshall; Acton, D. Scott; Lajoie, Charles-Philippe; Knight, J. Scott; Myers, Carey; Stark, Chris; JWST Wavefront Sensing & Control Team

    2018-01-01

    After JWST launches and unfolds in space, its telescope optics will be aligned through a complex series of wavefront sensing and control (WFSC) steps to achieve diffraction-limited performance. This iterative process will comprise about half of the observatory commissioning time (~ 3 out of 6 months). We summarize the JWST WFSC process, schedule, and expectations for achieved performance, and discuss our team’s activities to prepare for an effective & efficient telescope commissioning. During the recently-completed OTIS cryo test at NASA JSC, WFSC demonstrations showed the flight-like operation of the entire JWST active optics and WFSC system from end to end, including all hardware and software components. In parallel, the same test data were processed through the JWST Mission Operations Center at STScI to demonstrate the readiness of ground system components there (such as the flight operations system, data pipelines, archives, etc). Moreover, using the Astronomer’s Proposal Tool (APT), the entire telescope commissioning program has been implemented, reviewed, and is ready for execution. Between now and launch our teams will continue preparations for JWST commissioning, including further rehearsals and testing, to ensure a successful alignment of JWST’s telescope optics.

  16. A Stochastic Operational Planning Model for Smart Power Systems

    Directory of Open Access Journals (Sweden)

    Sh. Jadid

    2014-12-01

    Full Text Available Smart Grids are result of utilizing novel technologies such as distributed energy resources, and communication technologies in power system to compensate some of its defects. Various power resources provide some benefits for operation domain however, power system operator should use a powerful methodology to manage them. Renewable resources and load add uncertainty to the problem. So, independent system operator should use a stochastic method to manage them. A Stochastic unit commitment is presented in this paper to schedule various power resources such as distributed generation units, conventional thermal generation units, wind and PV farms, and demand response resources. Demand response resources, interruptible loads, distributed generation units, and conventional thermal generation units are used to provide required reserve for compensating stochastic nature of various resources and loads. In the presented model, resources connected to distribution network can participate in wholesale market through aggregators. Moreover, a novel three-program model which can be used by aggregators is presented in this article. Loads and distributed generation can contract with aggregators by these programs. A three-bus test system and the IEEE RTS are used to illustrate usefulness of the presented model. The results show that ISO can manage the system effectively by using this model

  17. Continuity of operations planning in college athletic programs: The case for incorporating Federal Emergency Management Guidelines.

    Science.gov (United States)

    Hall, Stacey A; Allen, Brandon L; Phillips, Dennis

    2016-01-01

    College athletic departments have a responsibility to provide a safe environment for student-athletes; however, most colleges do not have a crisis management plan that includes procedures for displaced student-athletes or alternate facilities to perform athletic events. Continuity of operations planning ensures athletic programs are equipped to maintain essential functions during, or shortly after, a disruption of operations due to possible hazards. Previous studies have identified a lack of emergency preparedness and continuity planning in college athletic departments. The purpose of this article is to illustrate in detail one approach to disaster planning for college athletic departments, namely the Federal Emergency Management Agency (FEMA) continuity of operations framework. By adhering to FEMA guidelines and promoting a best practices model, athletic programs can effectively plan to address potential hazards, as well as protect the organization's brand, image, and financial sustainability after a crisis event.

  18. C-018H Pre-Operational Baseline Sampling Plan

    International Nuclear Information System (INIS)

    Guzek, S.J.

    1993-01-01

    The objective of this task is to field characterize and sample the soil at selected locations along the proposed effluent line routes for Project C-018H. The overall purpose of this effort is to meet the proposed plan to discontinue the disposal of contaminated liquids into the Hanford soil column as described by DOE (1987). Detailed information describing proposed transport pipeline route and associated Kaiser Engineers Hanford Company (KEH) preliminary drawings (H288746...755) all inclusive, have been prepared by KEH (1992). The information developed from field monitoring and sampling will be utilized to characterize surface and subsurface soil along the proposed C-018H effluent pipeline and it's associated facilities. Potentially existing contaminant levels may be encountered therefore, soil characterization will provide a construction preoperational baseline reference, develop personnel safety requirements, and determine the need for any changes in the proposed routes prior to construction of the pipeline

  19. Integrated vehicle-based safety systems (IVBSS) : light vehicle platform field operational test data analysis plan.

    Science.gov (United States)

    2009-12-22

    This document presents the University of Michigan Transportation Research Institutes plan to : perform analysis of data collected from the light vehicle platform field operational test of the : Integrated Vehicle-Based Safety Systems (IVBSS) progr...

  20. Integrated vehicle-based safety systems (IVBSS) : heavy truck platform field operational test data analysis plan.

    Science.gov (United States)

    2009-11-23

    This document presents the University of Michigan Transportation Research Institutes plan to perform : analysis of data collected from the heavy truck platform field operational test of the Integrated Vehicle- : Based Safety Systems (IVBSS) progra...

  1. Weather integration in TMC operations : a self-evaluation and planning guide.

    Science.gov (United States)

    2009-04-01

    This flyer describes how Traffic Management Centers (TMC) can integrate weather information into their daily operations, and is based on the Road Weather Management Program publication, Self-Evaluation and Planning Guide (FHWA-JPO-08-057). The Guide ...

  2. Expanding transportation systems management and operations (TSM&O) from planning to construction primer.

    Science.gov (United States)

    2015-12-01

    The Florida Department of Transportation (FDOT) has initiated business plans to promote the Transportation : Systems Management and Operations (TSM&O) program throughout the State. TSM&O is traditionally managed : by traffic engineers that focus on o...

  3. U.S. Military Operations in Iraq: Planning, Combat, and Occupation

    National Research Council Canada - National Science Library

    Phillips, Kate; Lauth, Shane; Schenck, Erin

    2006-01-01

    On November 2, 2005, a colloquium entitled "U.S. Military Operations in Iraq: Planning, Combat and Occupation" was held in Washington, DC, at the Johns Hopkins School of Advanced International Studies (SAIS...

  4. Designing a Professional Development Plan for the Support Operations Officer of the Forward Support Company

    National Research Council Canada - National Science Library

    Zimmerman, Edward

    1999-01-01

    .... Based on these responsibilities, the research question (Does the Army need to design a specific professional development plan to train CSS lieutenants to serve as support operations officers in the FSC...

  5. Operational Plan for Underground Storage Tank 322 R2U2

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-06-07

    This Operational Plan provides the operator of the tank system with guidelines relating to the safe and compliant operation and maintenance of the tank system. The tank system schematic and list of emergency contacts shall be posted near the tank so they are visible to tank personnel. This Operational Plan shall be kept on file by the Facility Supervisor. It should be understood when managing this tank system that it is used to store hazardous waste temporarily for 90 calendar days or less. The rinsewater handled in the tank system is considered hazardous and may exhibit the characteristic of toxicity.

  6. Impact of Urban Heat Island under the Hanoi Master Plan 2030 on Cooling Loads in Residential Buildings

    Directory of Open Access Journals (Sweden)

    Tran Hoang Hai Nam

    2015-01-01

    Full Text Available This study aims to evaluate the influence of urban heat island (UHI under the Hanoi Master Plan 2030 on the energy consumption for space cooling in residential buildings. The weather conditions under the current and future status (master plan condition simulated in the previous study (Trihamdani et al., 2014 were used and cooling loads in all the residential buildings in Hanoi over the hottest month were estimated under the simulated current and future conditions by using the building simulation program, TRNSYS (v17. Three most typical housing types in the city were selected for the simulation. The cooling loads of respective housing types were obtained in each of the districts in Hanoi. The results show that the total cooling loads over June 2010 is approximately 683 Terajoule (TJ under the current status, but it is predicted to increase to 903 TJ under the master plan condition. The increment is largely due to the increase in number of households (203 TJ or 92%, but partially due to the increase in urban temperature, i.e. UHI effect (17 TJ or 8%. The increments in new built-up areas were found to be larger than those in existing built-up areas. The cooling load in apartment is approximately half of that in detached house, which is approximately half of that in row house. Moreover, it was seen that although sensible cooling loads increased with the increase in outdoor temperature, the latent cooling loads decreased due to the decrease in absolute humidity and the increase in air temperature.

  7. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    International Nuclear Information System (INIS)

    KIRKBRIDE, R.A.

    2000-01-01

    This document updates the operating scenario and plans for feed delivery to BNFL Inc. of retrieval and waste from single-shell tanks, and the overall process flowsheets for Phases 1 and 2 of the River Protection Project. The plans and flowsheets are updated with the most recent guidance from ORP and tank-by-tank inventory. The results provide the technical basis for the RTP-2 planning effort. Sensitivity cases were run to evaluate the effect of changes on key parameters

  8. Application of ConceptDraw Office for planning, documenting, monitoring of operating processes

    International Nuclear Information System (INIS)

    Bocharnikov, O.P.; Savenko, S.V.; Nikiforov, N.S.

    2011-01-01

    ConceptDraw Office allows effectively deciding the following tasks: to carry out planning, designing, control of implementation of production processes; to prepare working documents (engineering diagrams, process flor diagrams, evacuation and emergency plans; to create dashboards with information for organization management; to distribute the organization resources with the purpose of increase of efficiency and safety of operating processes.

  9. New York State intelligent transportation system commercial vehicle operations (CVO) : business plan

    Science.gov (United States)

    1998-07-01

    The purpose of this Business Plan is to describe the major Intelligent Transportation System (ITS) initiatives and projects in the area of Commercial Vehicle Operations (CVO) that have recently been or are planned to be undertaken in New York State b...

  10. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Science.gov (United States)

    2013-01-28

    ...-FXES11120800000F2-123-F2] Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... environmental assessment and proposed habitat conservation plan; request for comment. SUMMARY: We, the U.S. Fish...

  11. Using the LANDSAT data collection system for field geophysics: Operations in the British Virgin Islands. [relaying borehole tiltmeter data

    Science.gov (United States)

    Webster, W. J., Jr.; Allen, W. K.; Gilbert, E. L.; Painter, J. E. (Principal Investigator)

    1980-01-01

    This particular application was to vertical geodesy by tide gauge and tiltmeter on a small desert island in the British Virgin Islands. The performance of the LANDSAT system under potentially marginal circumstances was found to be excellent.

  12. Safety evaluation by living probabilistic safety assessment. Procedures and applications for planning of operational activities and analysis of operating experience

    International Nuclear Information System (INIS)

    Johanson, Gunnar; Holmberg, J.

    1994-01-01

    Living Probabilistic Safety Assessment (PSA) is a daily safety management system and it is based on a plant-specific PSA and supporting information systems. In the living use of PSA, plant status knowledge is used to represent actual plant safety status in monitoring or follow-up perspective. The PSA model must be able to express the risk at a given time and plant configuration. The process, to update the PSA model to represent the current or planned configuration and to use the model to evaluate and direct the changes in the configuration, is called living PSA programme. The main purposes to develop and increase the usefulness of living PSA are: Long term safety planning: To continue the risk assessment process started with the basic PSA by extending and improving the basic models and data to provide a general risk evaluation tool for analyzing the safety effects of changes in plant design and procedures. Risk planning of operational activities: To support the operational management by providing means for searching optimal operational maintenance and testing strategies from the safety point of view. The results provide support for risk decision making in the short term or in a planning mode. The operational limits and conditions given by technical specifications can be analyzed by evaluating the risk effects of alternative requirements in order to balance the requirements with respect to operational flexibility and plant economy. Risk analysis of operating experience: To provide a general risk evaluation tool for analyzing the safety effects of incidents and plant status changes. The analyses are used to: identify possible high risk situations, rank the occurred events from safety point of view, and get feedback from operational events for the identification of risk contributors. This report describes the methods, models and applications required to continue the process towards a living use of PSA. 19 tabs, 20 figs

  13. Optimal Planning and Operation Management of a Ship Electrical Power System with Energy Storage System

    DEFF Research Database (Denmark)

    Anvari-Moghaddam, Amjad; Dragicevic, Tomislav; Meng, Lexuan

    2016-01-01

    Next generation power management at all scales is highly relying on the efficient scheduling and operation of different energy sources to maximize efficiency and utility. The ability to schedule and modulate the energy storage options within energy systems can also lead to more efficient use...... of the generating units. This optimal planning and operation management strategy becomes increasingly important for off-grid systems that operate independently of the main utility, such as microgrids or power systems on marine vessels. This work extends the principles of optimal planning and economic dispatch...... for the proposed plan is derived based on the solution from a mixed-integer nonlinear programming (MINLP) problem. Simulation results showed that including well-sized energy storage options together with optimal operation management of generating units can improve the economic operation of the test system while...

  14. Probabilistic tools for planning and operating power systems with distributed energy storage

    DEFF Research Database (Denmark)

    Klöckl, Bernd; Papaefthymiou, George; Pinson, Pierre

    2008-01-01

    Stochastic energy flows are an increasingly important phenomenon in today's power system planning and operation. They are – among other reasons – caused by large amounts of stochastic generation such as wind. The inclusion of energy storage devices, distributed in future systems (distributed energy...... owners are either the grid operators, the generation owners, or the energy traders. For the grid operators being the DES owners, storage operation will have to be integrated into the planning of the system, therefore multivariate nonparametric time series analysis and synthesis methods have to be applied...... to recorded data of stochastic energy resources. Together with suited storage models, the implications of DES on the planning of the system can then be assessed. For the producers or traders being the owners of the DES, the topic to be addressed is the real-time operation of each storage device in the power...

  15. WP3 Prototype development for operational planning tool

    DEFF Research Database (Denmark)

    Kristoffersen, Trine; Meibom, Peter; Apfelbeck, J.

    is documented in chapter 1 and 2. The inclusion of load uncertainty and forced outages in the Scenario Tree Tool enables calculation of the demand for reserve power depending on the forecast horizon. The algorithm is given in Section 3.1. The design of a modified version of the Joint Market Model enabling...... estimation of the optimal amount of reserve power to reserve day-ahead before the actual operation hour is documented in Section 3.2. With regard to the evaluation of a power system, its ability to cope with extreme events is crucial to be investigated. Chapter 4 gives a definition of such extreme events....... Further, the methodology to identify extreme events on the basis of the existing tools is described. Within the SUPWIND consortium there has been an interest in using the Joint Market Model to model smaller parts of a power system but with more detailed representation of the transmission and distribution...

  16. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    Energy Technology Data Exchange (ETDEWEB)

    KIRKBRIDE, R.A.

    1999-05-04

    The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.

  17. 30 CFR 937.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 937.784 Section 937.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  18. 30 CFR 903.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 903.784 Section 903.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application...

  19. 30 CFR 910.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 910.784 Section 910.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  20. 30 CFR 942.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 942.780 Section 942.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  1. 30 CFR 947.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 947.784 Section 947.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  2. 30 CFR 942.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 942.784 Section 942.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  3. 30 CFR 939.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 939.784 Section 939.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  4. 30 CFR 912.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 912.780 Section 912.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  5. 30 CFR 921.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 921.780 Section 921.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  6. 30 CFR 941.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 941.784 Section 941.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  7. 30 CFR 939.780 - Surface mining permit applications-minimum requirements for reclamation and operations plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operations plan. 939.780 Section 939.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operations plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  8. 30 CFR 905.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 905.780 Section 905.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  9. 30 CFR 922.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 922.784 Section 922.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  10. 30 CFR 947.780 - Surface mining permit application-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 947.780 Section 947.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Application—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  11. 30 CFR 933.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 933.780 Section 933.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  12. 30 CFR 910.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 910.780 Section 910.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  13. 30 CFR 922.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 922.780 Section 922.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  14. 30 CFR 905.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 905.784 Section 905.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  15. 30 CFR 933.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 933.784 Section 933.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  16. 30 CFR 903.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 903.780 Section 903.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application to conduct...

  17. 30 CFR 912.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 912.784 Section 912.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  18. 30 CFR 937.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 937.780 Section 937.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  19. 30 CFR 921.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 921.784 Section 921.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  20. 30 CFR 941.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 941.780 Section 941.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  1. Three Mile Island Nuclear Station, Unit 1. Semiannual operating report No. 4, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Information is presented concerning operations, shutdowns, maintenance, changes, tests, experiments, radioactive effluent releases, solid radioactive waste, primary coolant chemistry, personel radiation, and refueling. Histograms of thermal power vs. time are included

  2. Forecasting accidental marine pollution drift: the French operational plan

    International Nuclear Information System (INIS)

    Daniel, P.; Poitevin, J.; Tiercelin, C.; Marchand, M.

    1998-01-01

    In case of accidental marine pollution, Cedre and Meteo-France, within the framework of their own public service missions, provide assistance to the French authorities in charge of pollution response. Meteo-France has developed a numerical marine oil pollution transport model, named MOTHY, designed to simulate the transport of oil in three dimensions. A hydrodynamic ocean model is linked to an oil spill model including current shear, vertical movements and fate of the oil. The use of a global atmospheric model for atmospheric forcing enables world-wide application of the model. This oil spill response system has been operational since February 1994. In case of marine pollution, Meteo-France send meteorological forecasts and oil spill drift forecasts to Cedre. In return, by its experimentations and interventions on actual pollution, Cedre is contributing to the improvement and validation of the model. New developments, exercises and training are conducted jointly. This paper summarizes the key features of MOTHY and presents some examples of model applications. (author)

  3. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  4. Motion and operation planning of robotic systems background and practical approaches

    CERN Document Server

    Gomez-Barvo, Fernando

    2015-01-01

    This book addresses the broad multi-disciplinary topic of robotics, and presents the basic techniques for motion and operation planning in robotics systems. Gathering contributions from experts in diverse and wide ranging fields, it offers an overview of the most recent and cutting-edge practical applications of these methodologies. It covers both theoretical and practical approaches, and elucidates the transition from theory to implementation. An extensive analysis is provided, including humanoids, manipulators, aerial robots and ground mobile robots. ‘Motion and Operation Planning of Robotic Systems’ addresses the following topics: *The theoretical background of robotics. *Application of motion planning techniques to manipulators, such as serial and parallel manipulators. *Mobile robots planning, including robotic applications related to aerial robots, large scale robots and traditional wheeled robots. *Motion planning for humanoid robots. An invaluable reference text for graduate students and researche...

  5. A Test Platform for Planned Field Operations Using LEGO Mindstorms NXT

    Directory of Open Access Journals (Sweden)

    Gareth Edwards

    2013-11-01

    Full Text Available Testing agricultural operations and management practices associated with different machinery, systems and planning approaches can be both costly and time-consuming. Computer simulations of such systems are used for development and testing; however, to gain the experience of real-world performance, an intermediate step between simulation and full-scale testing should be included. In this paper, a potential common framework using the LEGO Mindstorms NXT micro-tractor platform is described in terms of its hardware and software components. The performance of the platform is demonstrated and tested in terms of its capability of supporting decision making on infield operation planning. The proposed system represents the basic measures for developing a complete test platform for field operations, where route plans, mission plans, multiple-machinery cooperation strategies and machinery coordination can be executed and tested in the laboratory.

  6. Reliability and risk-based planning of operation and maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Florian, Mihai; Berzonskis, Arvydas

    2016-01-01

    costly (and safe), and it is important to include in the reliability assessment the information obtained during operation (from condition monitoring and inspections) and the maintenance performed (incl. repairs and replacements). The paper presents a risk-based approach for optimal planning of Operation...

  7. Optimal, Risk-based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2008-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based life-cycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue...

  8. Small Explorer project: Submillimeter Wave Astronomy Satellite (SWAS). Mission operations and data analysis plan

    Science.gov (United States)

    Melnick, Gary J.

    1990-01-01

    The Mission Operations and Data Analysis Plan is presented for the Submillimeter Wave Astronomy Satellite (SWAS) Project. It defines organizational responsibilities, discusses target selection and navigation, specifies instrument command and data requirements, defines data reduction and analysis hardware and software requirements, and discusses mission operations center staffing requirements.

  9. Cost-related Nonadherence to Medication Treatment Plans: Native Hawaiian and Pacific Islander National Health Interview Survey, 2014.

    Science.gov (United States)

    McElfish, Pearl A; Long, Christopher R; Payakachat, Nalin; Felix, Holly; Bursac, Zoran; Rowland, Brett; Hudson, Jonell S; Narcisse, Marie-Rachelle

    2018-04-01

    Adherence to medication treatment plans is important for chronic disease (CD) management. Cost-related nonadherence (CRN) puts patients at risk for complications. Native Hawaiians and Pacific Islanders (NHPI) suffer from high rates of CD and socioeconomic disparities that could increase CRN behaviors. Examine factors related to CRN to medication treatment plans within an understudied population. Using 2014 NHPI-National Health Interview Survey data, we examined CRN among a nationally representative sample of NHPI adults. Bonferroni-adjusted Wald test and multivariable logistic regression were performed to examine associations among financial burden-related factors, CD status, and CRN. Across CD status, NHPI engaged in CRN behaviors had, on an average, increased levels of perceived financial stress, financial insecurity with health care, and food insecurity compared with adults in the total NHPI population. Regression analysis indicated perceived financial stress [adjusted odds ratio (AOR)=1.16; 95% confidence intervals (CI), 1.10-1.22], financial insecurity with health care (AOR=1.96; 95% CI, 1.32-2.90), and food insecurity (AOR=1.30; 95% CI, 1.06-1.61) all increase the odds of CRN among those with CD. We also found significant associations between perceived financial stress (AOR=1.15; 95% CI, 1.09-1.20), financial insecurity with health care (AOR=1.59; 95% CI, 1.19-2.12), and food insecurity (AOR=1.31; 95% CI, 1.04-1.65) and request for lower cost medication. This study demonstrated health-related and non-health-related financial burdens can influence CRN behaviors. It is important for health care providers to collect and use data about the social determinants of health to better inform their conversations about medication adherence and prevent CRN.

  10. Evaluation of the EIA system on the Island of Mauritius and development of an environmental monitoring plan framework

    International Nuclear Information System (INIS)

    Ramjeawon, T.; Beedassy, R.

    2004-01-01

    The Environment Protection Act (EPA) in Mauritius provides for the application of an EIA license in respect of undertakings listed in its first schedule. Following the promulgation of the Act in June 1993, the Department of Environment (DOE) is issuing an average of 125 EIA licenses yearly. In general, the review exercise of an environmental impact assessment (EIA) is terminated once the license has been granted. The aim of this project was to evaluate the EIA system in Mauritius and to identify its weaknesses and strengths. One of the main weaknesses, besides the lack of EIA audits, is the absence of EIA follow-up monitoring. It is necessary to distinguish between monitoring done for regulatory purposes (compliance monitoring) and environmental monitoring related to the EIA. With the growth of the tourism industry on the island, coastal development projects have the potential to cause significant environmental impacts . A sample of EIA reports pertaining to this sector was assessed for its quality and follow-up mechanisms. Proposals for the contents of EIA Prediction Audits, Environmental Monitoring Plans (EMP) and the format for an EMP report are made

  11. Improving the Operations of the Earth Observing One Mission via Automated Mission Planning

    Science.gov (United States)

    Chien, Steve A.; Tran, Daniel; Rabideau, Gregg; Schaffer, Steve; Mandl, Daniel; Frye, Stuart

    2010-01-01

    We describe the modeling and reasoning about operations constraints in an automated mission planning system for an earth observing satellite - EO-1. We first discuss the large number of elements that can be naturally represented in an expressive planning and scheduling framework. We then describe a number of constraints that challenge the current state of the art in automated planning systems and discuss how we modeled these constraints as well as discuss tradeoffs in representation versus efficiency. Finally we describe the challenges in efficiently generating operations plans for this mission. These discussions involve lessons learned from an operations model that has been in use since Fall 2004 (called R4) as well as a newer more accurate operations model operational since June 2009 (called R5). We present analysis of the R5 software documenting a significant (greater than 50%) increase in the number of weekly observations scheduled by the EO-1 mission. We also show that the R5 mission planning system produces schedules within 15% of an upper bound on optimal schedules. This operational enhancement has created value of millions of dollars US over the projected remaining lifetime of the EO-1 mission.

  12. Cautious but Committed: Moving Toward Adaptive Planning and Operation Strategies for Renewable Energy's Wildlife Implications

    Science.gov (United States)

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned—creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  13. Cautious but committed: moving toward adaptive planning and operation strategies for renewable energy's wildlife implications.

    Science.gov (United States)

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned-creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  14. IUS/TUG orbital operations and mission support study. Volume 4: Project planning data

    Science.gov (United States)

    1975-01-01

    Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.

  15. Light Duty Utility Arm system pre-operational (cold test) test plan

    International Nuclear Information System (INIS)

    Bennett, K.L.

    1995-01-01

    The Light Duty Utility (LDUA) Cold Test Facility, located in the Hanford 400 Area, will be used to support cold testing (pre- operational tests) of LDUA subsystems. Pre-operational testing is composed of subsystem development testing and rework activities, and integrated system qualification testing. Qualification testing will be conducted once development work is complete and documentation is under configuration control. Operational (hot) testing of the LDUA system will follow the testing covered in this plan and will be covered in a separate test plan

  16. Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Barr, Jonathan L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tuffner, Francis K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Mark D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kreyling, Sean J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schneider, Kevin P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

  17. Advances in Distributed Operations and Mission Activity Planning for Mars Surface Exploration

    Science.gov (United States)

    Fox, Jason M.; Norris, Jeffrey S.; Powell, Mark W.; Rabe, Kenneth J.; Shams, Khawaja

    2006-01-01

    A centralized mission activity planning system for any long-term mission, such as the Mars Exploration Rover Mission (MER), is completely infeasible due to budget and geographic constraints. A distributed operations system is key to addressing these constraints; therefore, future system and software engineers must focus on the problem of how to provide a secure, reliable, and distributed mission activity planning system. We will explain how Maestro, the next generation mission activity planning system, with its heavy emphasis on portability and distributed operations has been able to meet these design challenges. MER has been an excellent proving ground for Maestro's new approach to distributed operations. The backend that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

  18. Optimal dimensioning of low-energy district heating networks with operational planning

    DEFF Research Database (Denmark)

    Tol, Hakan; Svendsen, Svend

    2012-01-01

    in design stage resulted in satisfaction of heat demand of the house in low temperature operation. In this paper the operational planning of the low-energy DH systems was investigated to reduce the dimensions of the distribution network with consideration given both to current high-heat and future low......-heat demand situations. The operational planning was based on boosting (increasing) the supply temperature at peak-demand situations which occur rarely over a year period. Hence optimal pipe dimensions of low-energy DH systems were investigated based on the dynamic response of in-house heating systems...... of operational planning in comparison to DH network dimensioned according to high heat demand situation....

  19. Sales and operations planning : design and implementation of S&OP process in a multinational company

    OpenAIRE

    Lima, Gonçalo Maria Eva Ferreira Neves

    2013-01-01

    The company under scrutiny in this thesis is Aker Solutions Process Systems. As a part of the Aker Solutions group, Process Systems is a leading global supplier of processing equipment for oil, water and gas, operating worldwide. The company´s operational objective when implementing this process was to optimize the utilization of resources in it´s five different Business Units. The actions undertaken by the company to develop and implement a Sales and Operations Planning proces...

  20. A scientific operations plan for the large space telescope. [ground support system design

    Science.gov (United States)

    West, D. K.

    1977-01-01

    The paper describes an LST ground system which is compatible with the operational requirements of the LST. The goal of the approach is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of LST science. Attention is given to cost constraints and guidelines, the telemetry operations processing systems (TELOPS), the image processing facility, ground system planning and data flow, and scientific interfaces.