WorldWideScience

Sample records for plan includes descriptions

  1. 29 CFR 1952.220 - Description of the plan as initially approved.

    Science.gov (United States)

    2010-07-01

    ... respecting safety and health of employees in all workplaces of the State with the exception of employees of... requirements of the Occupational Safety and Health Act of 1970 and is consistent with the Constitution and laws...) The plan description documents including the Tennessee Occupational Safety and Health Act, the...

  2. 29 CFR 2520.102-3 - Contents of summary plan description.

    Science.gov (United States)

    2010-07-01

    ... business of each trustee of the plan; (i) If a plan is maintained pursuant to one or more collective... Examine, without charge, at the plan administrator's office and at other specified locations, such as... 29 Labor 9 2010-07-01 2010-07-01 false Contents of summary plan description. 2520.102-3 Section...

  3. Progress report on first year of WP5.2. Including detailed description of planned research for WP 5.2

    Energy Technology Data Exchange (ETDEWEB)

    Ellemers, N.; Van Dijk, E.; Terwel, B.; De Vries, G. [Leiden University, Leiden (Netherlands)

    2010-10-15

    This document contains the progress report on the first half year of the CATO-2 WP5.2 PhD project 'Framing effects in communication about CCS'. In the first few months a literature study has been conducted, both on (factors that influence) public perceptions and acceptance of CCS, and on framing. In the last two month, a first study was designed. This study consists of an experiment designed to examine how framing a company's involvement in CCS in terms of economic benefits and/or CSR of the organization affects the corporate image, trust, and perceived 'greenwashing' (deceit). Furthermore, this experiment serves to test the quality of newly developed questionnaires to measure these variables. In addition, this document contains a detailed description of the research planned for WP5.2 written by senior (CATO-2) researchers from January 2010 on. The objective of the research planned for WP5.2 is to examine whether framing of communications by an organization can improve the perceived credibility and trustworthiness of the organization and the information provided. This issue will be examined by a combination of experimental studies and a survey-type study.

  4. PDDL4J: a planning domain description library for java

    Science.gov (United States)

    Pellier, D.; Fiorino, H.

    2018-01-01

    PDDL4J (Planning Domain Description Library for Java) is an open source toolkit for Java cross-platform developers meant (1) to provide state-of-the-art planners based on the Pddl language, and (2) to facilitate research works on new planners. In this article, we present an overview of the Automated Planning concepts and languages. We present some planning systems and their most significant applications. Then, we detail the Pddl4j toolkit with an emphasis on the available informative structures, heuristics and search algorithms.

  5. 29 CFR 1952.150 - Description of the plan as initially approved.

    Science.gov (United States)

    2010-07-01

    ... Carolina § 1952.150 Description of the plan as initially approved. (a) The Department of Labor has been designated by the Governor of North Carolina to administer the plan throughout the State. The Department of... are not covered by the Federal act by virtue of section 4(b)(1) thereof, dockside maritime and...

  6. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  7. Model for safety reports including descriptive examples

    International Nuclear Information System (INIS)

    1995-12-01

    Several safety reports will be produced in the process of planning and constructing the system for disposal of high-level radioactive waste in Sweden. The present report gives a model, with detailed examples, of how these reports should be organized and what steps they should include. In the near future safety reports will deal with the encapsulation plant and the repository. Later reports will treat operation of the handling systems and the repository

  8. Framing health for land-use planning legislation: A qualitative descriptive content analysis.

    Science.gov (United States)

    Harris, Patrick; Kent, Jennifer; Sainsbury, Peter; Thow, Anne Marie

    2016-01-01

    Framing health as a relevant policy issue for other sectors is not well understood. A recent review of the New South Wales (Australia) land-use planning system resulted in the drafting of legislation with an internationally unprecedented focus on human health. We apply a political science approach to investigate the question 'how and to what extent were health and wider issues framed in submissions to the review?' We investigated a range of stakeholder submissions including health focussed agencies (n = 31), purposively identified key stakeholders with influence on the review (n = 24), and a random sample of other agencies and individuals (n = 47). Using qualitative descriptive analysis we inductively coded for the term 'health' and sub-categories. We deductively coded for 'wider concerns' using a locally endorsed 'Healthy Urban Development Checklist'. Additional inductive analysis uncovered further 'wider concerns'. Health was explicitly identified as a relevant issue for planning policy only in submissions by health-focussed agencies. This framing concerned the new planning system promoting and protecting health as well as connecting health to wider planning concerns including economic issues, transport, public open space and, to a slightly lesser extent, environmental sustainability. Key stakeholder and other agency submissions focussed on these and other wider planning concerns but did not mention health in detail. Health agency submissions did not emphasise infrastructure, density or housing as explicitly as others. Framing health as a relevant policy issue has the potential to influence legislative change governing the business of other sectors. Without submissions from health agencies arguing the importance of having health as an objective in the proposed legislation it is unlikely health considerations would have gained prominence in the draft bill. The findings have implications for health agency engagement with legislative change processes and beyond in

  9. How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.

    Science.gov (United States)

    Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H

    2018-06-12

    To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout

  10. The Chalk River Nuclear Laboratories contingency plan -a brief description

    International Nuclear Information System (INIS)

    White, J.M.

    1982-01-01

    A brief description of the contingency plan which deals with both the on-site and off-site consequences of a serious nuclear accident is given. The off-site consequences of different size releases and the subsequent action taken by employees, radiation protection experts, municipal, Provincial and Federal authorities is described and the interaction of the various groups is discussed. (author)

  11. Diabetes Nutrition: Including Sweets in Your Meal Plan

    Science.gov (United States)

    Diabetes nutrition: Including sweets in your meal plan Diabetes nutrition focuses on healthy foods, but sweets aren't necessarily ... your meal plan. By Mayo Clinic Staff Diabetes nutrition focuses on healthy foods. But you can eat ...

  12. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Vogelsang, Stefan; Freudenberg, Peggy

    2015-01-01

    This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data.......This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data....

  13. 30 CFR 784.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Existing structures. 784.12... PLAN § 784.12 Operation plan: Existing structures. (a) Each application shall contain a description of... and reclamation operation. The description shall include: (1) Location; (2) Plans of the structure...

  14. 30 CFR 250.110 - What must I include in my welding plan?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What must I include in my welding plan? 250.110... must I include in my welding plan? You must include all of the following in the Welding Plan that you... qualified personnel weld; (c) Practices and procedures for safe welding that address: (1) Welding in...

  15. The role of descriptive norm within the theory of planned behavior in predicting Korean Americans' exercise behavior.

    Science.gov (United States)

    Lee, Hyo

    2011-08-01

    There are few studies investigating psychosocial mechanisms in Korean Americans' exercise behavior. The present study tested the usefulness of the theory of planned behavior in predicting Korean American's exercise behavior and whether the descriptive norm (i.e., perceptions of what others do) improved the predictive validity of the theory of planned behavior. Using a retrospective design and self-report measures, web-survey responses from 198 Korean-American adults were analyzed using hierarchical regression analyses. The theory of planned behavior constructs accounted for 31% of exercise behavior and 43% of exercise intention. Intention and perceived behavioral control were significant predictors of exercise behavior. Although the descriptive norm did not augment the theory of planned behavior, all original constructs--attitude, injunctive norm (a narrow definition of subjective norm), and perceived behavioral control--statistically significantly predicted leisure-time physical activity intention. Future studies should consider random sampling, prospective design, and objective measures of physical activity.

  16. Advanced methodology for generation expansion planning including interconnected systems

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, M; Yokoyama, R; Yasuda, K [Tokyo Metropolitan Univ. (Japan); Sasaki, H [Hiroshima Univ. (Japan); Ogimoto, K [Electric Power Development Co. Ltd., Tokyo (Japan)

    1994-12-31

    This paper reviews advanced methodology for generation expansion planning including interconnected systems developed in Japan, putting focus on flexibility and efficiency in a practical application. First, criteria for evaluating flexibility of generation planning considering uncertainties are introduced. Secondly, the flexible generation mix problem is formulated as a multi-objective optimization with more than two objective functions. The multi-objective optimization problem is then transformed into a single objective problem by using the weighting method, to obtain the Pareto optimal solution, and solved by a dynamics programming technique. Thirdly, a new approach for electric generation expansion planning of interconnected systems is presented, based on the Benders Decomposition technique. That is, large scale generation problem constituted by the general economic load dispatch problem, and several sub problems which are composed of smaller scale isolated system generation expansion plans. Finally, the generation expansion plan solved by an artificial neural network is presented. In conclusion, the advantages and disadvantages of this method from the viewpoint of flexibility and applicability to practical generation expansion planning are presented. (author) 29 refs., 10 figs., 4 tabs.

  17. 40 CFR 60.3012 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ..., 2004 Model Rule-Waste Management Plan § 60.3012 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation of waste-stream elements.... The plan must identify any additional waste management measures and implement those measures the...

  18. 40 CFR 62.14590 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14590 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or... use of recyclable materials. The plan must identify any additional waste management measures, and the...

  19. 40 CFR 60.2630 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2630 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation... of recyclable materials. The plan must identify any additional waste management measures, and the...

  20. Applying the model of Goal-Directed Behavior, including descriptive norms, to physical activity intentions: A contribution to improving the Theory of Planned Behavior

    Science.gov (United States)

    The theory of planned behavior (TPB) has received its fair share of criticism lately, including calls for it to retire. We contributed to improving the theory by testing extensions such as the model of goal-directed behavior (MGDB, which adds desire and anticipated positive and negative emotions) ap...

  1. Project No. 8 - Final decommissioning plan

    International Nuclear Information System (INIS)

    2000-01-01

    Ignalina NPP should prepare the final Ignalina NPP unit 1 decommissioning plan by march 31, 2002. This plan should include the following : description of Ignalina NPP and the Ignalina NPP boundary that could be influenced by decommissioning process; decommissioning strategy selected and a logical substantiation for this selection; description of the decommissioning actions suggested and a time schedule for the actions to be performed; conceptual safety and environmental impact assessment covering ionizing radiation and other man and environment impact; description of the environmental monitoring program proposed during decommissioning process; description of the waste management proposed; assessment of decommissioning expenses including waste management, accumulated funds and other sources. Estimated project cost - 0.75 M EURO

  2. 40 CFR 60.2901 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... Analysis Waste Management Plan § 60.2901 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation of waste-stream elements such as... must identify any additional waste management measures and implement those measures the source...

  3. Home health nurse decision-making regarding visit intensity planning for newly admitted patients: a qualitative descriptive study.

    Science.gov (United States)

    Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H

    2018-04-13

    Despite patients referred to home health having diverse and complex needs, it is unknown how nurses develop personalized visit plans. In this qualitative descriptive study, we interviewed 26 nurses from three agencies about their decision-making process to determine visit intensity and analyzed data using directed content analysis. Following a multifactorial assessment of the patient, nurses relied on their experience and their agency's protocols to develop the personalized visit plan. They revised the plan based on changes in the patient's clinical condition, engagement, and caregiver availability. Findings suggest strategies to improve visit planning and positively influence outcomes of home health patients.

  4. First-year success in a nursing baccalaureate plan of study: A descriptive research study.

    Science.gov (United States)

    Ott, Vivian; Thomas, Jessica A; Fernando, Harshini

    2018-08-01

    Predicting students' aptitude for post-secondary success remains a widely studied topic. This descriptive study explored demographic variables contributing to success in quantitative courses required by the nursing degree plan. Identification of an "at risk" student profile may inform interventions with which to support attainment of an academic degree. The purpose of this study was to examine the associations between demographic characteristics and successful completion of baccalaureate nursing courses thought to enhance quantitative reasoning skills: first-year math, first-year chemistry, and second-year pathopharmacology nursing. This retrospective analysis accessed 4521 academic records of students who took these three courses at a United States university sometime between Fall 2008 and Fall 2015. De-identified student data included course grades, gender, full-time study, income, marital status, first generation, secondary school (also known as high school) location, dual credit, and high school and university grade point averages. Descriptive statistical analysis was conducted to describe the important features of the data. Of the 4521 records, 2556 undergraduates (57%) passed the courses in which they were enrolled. Among successful students, females outnumbered males (66%), ages ranged from 20 to 24 years, 86% were classified as low income, 54% fit the designation of first generation, and 12% earned dual credit (university credit during secondary school). Our data demonstrate a positive relationship between dual credit and success, with the strongest correlation (0.62) noted for students in pathopharmacology. In the baccalaureate-nursing plan of study, courses thought to enhance students' quantitative reasoning skills remain difficult for some to successfully complete. We conclude that the more successful students tend to be older, have a higher income, and a higher high school grade point average, while those less successful are directly out of high

  5. A pre-feasibility case study on integrated resource planning including renewables

    International Nuclear Information System (INIS)

    Yilmaz, Pelin; Hakan Hocaoglu, M.; Konukman, Alp Er S.

    2008-01-01

    In recent years, economical and environmental constraints force governments and energy policy decision-makers to change the prominent characteristics of the electricity markets. Accordingly, depending on local conditions on the demand side, usage of integrated resource planning approaches in conjunction with renewable technologies has gained more importance. In this respect, an integrated resource planning option, which includes the design and optimization of grid-connected renewable energy plants, should be evaluated to facilitate a cost-effective and green solution to a sustainable future. In this paper, an integrated resource planning case is studied for an educational campus, located in Gebze, Turkey. It is found that for the considered campus, the integrated resource planning scenario that includes renewables as a supply-side option with existing time-of-use tariff may provide a cost-effective energy production, particularly for the high penetration level of the renewables

  6. 12 CFR 563b.105 - What information must I include in my business plan?

    Science.gov (United States)

    2010-01-01

    ... information must I include in my business plan? (a) Prior to filing an application for conversion, you must adopt a business plan reflecting your intended plans for deployment of the proposed conversion proceeds. Your business plan is required, under § 563b.150, to be included in your conversion application. At a...

  7. South Dakota ITS/CVO business plan : final business plan

    Science.gov (United States)

    1998-01-18

    This report defines an Intelligent Transportation Systems/Commercial Vehicle Operations (ITS/CVO) program for the State of South Dakota. Structured as a business plan, the document includes the following components: 1) description of the current CVO ...

  8. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  9. 29 CFR 2520.104b-4 - Alternative methods of compliance for furnishing the summary plan description and summaries of...

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Alternative methods of compliance for furnishing the summary plan description and summaries of material modifications of a pension plan to a retired participant, a separated participant with vested benefits, and a beneficiary receiving benefits. 2520.104b-4 Section 2520.104b-4 Labor Regulations Relating to...

  10. What to include in your birth plan

    Science.gov (United States)

    Pregnancy - birth plan ... Birth plans are guides that parents-to-be make to help their health care providers best support them during ... things to consider before you make a birth plan. This is a great time to learn about ...

  11. 10 CFR 719.10 - What information must be included in the legal management plan?

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  12. Nuclear matter descriptions including quark structure of the hadrons

    International Nuclear Information System (INIS)

    Huguet, R.

    2008-07-01

    It is nowadays well established that nucleons are composite objects made of quarks and gluons, whose interactions are described by Quantum chromodynamics (QCD). However, because of the non-perturbative character of QCD at the energies of nuclear physics, a description of atomic nuclei starting from quarks and gluons is still not available. A possible alternative is to construct effective field theories based on hadronic degrees of freedom, in which the interaction is constrained by QCD. In this framework, we have constructed descriptions of infinite nuclear matter in relativistic mean field theories taking into account the quark structure of hadrons. In a first approach, the in medium modifications of mesons properties is dynamically obtained in a Nambu-Jona-Lasinio (NJL) quark model. This modification is taken into account in a relativistic mean field theory based on a meson exchange interaction between nucleons. The in-medium modification of mesons masses and the properties of infinite nuclear matter have been studied. In a second approach, the long and short range contributions to the in-medium modification of the nucleon are determined. The short range part is obtained in a NJL quark model of the nucleon. The long range part, related to pions exchanges between nucleons, has been determined in the framework of Chiral Perturbation theory. These modifications have been used to constrain the couplings of a point coupling relativistic mean field model. A realistic description of the saturation properties of nuclear matter is obtained. (author)

  13. INEL D ampersand D Long-Range Plan

    International Nuclear Information System (INIS)

    Buckland, R.J.; Kenoyer, D.J.; Preussner, D.H.

    1993-10-01

    This Long-Range Plan presents the Decontamination and Decommissioning (D ampersand D) Program planning status for facilities at the Idaho National Engineering Laboratory (INEL). The plan provides a general description of the D ampersand D Program objectives, management criteria, and philosophy; discusses current activities; and documents the INEL D ampersand D Program cost and schedule estimate projections for the next 15 years. appendices are included that provide INEL D ampersand D project historical information and a comprehensive descriptive summary of each current surplus facility

  14. 40 CFR 60.2065 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... Management Plan § 60.2065 What should I include in my waste management plan? A waste management plan must... additional waste management measures and implement those measures the source considers practical and feasible, considering the effectiveness of waste management measures already in place, the costs of additional measures...

  15. INEL D&D long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Buckland, R.J.; Kenoyer, D.J.; LaBuy, S.A.

    1995-09-01

    This Long-Range Plan presents the Decontamination and Dismantlement (D&D) Program planning status for facilities at the Idaho National Engineering Laboratory (INEL). The plan provides a general description of the D&D Program objectives, management criteria, and policy; discusses current activities; and documents the INEL D&D Program cost and schedule estimate projections for the next 15 years. Appendices are included that provide INEL D&D project historical information, a comprehensive descriptive summary of each current D&D surplus facility, and a summary database of all INEL contaminated facilities awaiting or undergoing the facility transition process.

  16. 25 CFR 170.411 - What may a long-range transportation plan include?

    Science.gov (United States)

    2010-04-01

    ...) Social and economic development planning to identify transportation improvements or needs to accommodate... 25 Indians 1 2010-04-01 2010-04-01 false What may a long-range transportation plan include? 170.411 Section 170.411 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN...

  17. 12 CFR 516.20 - What information must I include in my draft business plan?

    Science.gov (United States)

    2010-01-01

    ... business plan? 516.20 Section 516.20 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE... What information must I include in my draft business plan? If you must submit a draft business plan... described in the savings association's draft business plan; and (d) Demonstrate how applicable requirements...

  18. Recommended Resources for Planning to Evaluate Program Improvement Efforts (Including the SSIP)

    Science.gov (United States)

    National Center for Systemic Improvement at WestEd, 2015

    2015-01-01

    This document provides a list of recommended existing resources for state Part C and Part B 619 staff and technical assistance (TA) providers to utilize to support evaluation planning for program improvement efforts (including the State Systemic Improvement Plan, SSIP). There are many resources available related to evaluation and evaluation…

  19. National Waste Terminal Storage Program: planning and control plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Objective of the NWTS program planning and control plan is to provide the information necessary for timely and effective OWI management decisions. Purpose is to describe the concepts and techniques that will be utilized by OWI to establish structured, completely planned and controlled technical, cost, and schedule NWTS baselines from which performance or progress can be accurately measured

  20. Hanford Waste Vitrification Plant Technology Plan

    International Nuclear Information System (INIS)

    Sexton, R.A.

    1988-06-01

    The reference Hanford plan for disposal of defense high-level waste is based on waste immobilization in glass by the vitrification process and temporary vitrified waste storage at the Hanford Site until final disposal in a geologic repository. A companion document to the Hanford Waste Management Plan (HWMP) is the Draft, Interim Hanford Waste Management Technology Plan (HWMTP), which provides a description of the technology that must be developed to meet the reference waste management plan. One of the issues in the HWMTP is DST-6, Immobilization (Glass). The HWMTP includes all expense funding needed to complete the Hanford Waste Vitrification Plant (HWVP) project. A preliminary HWVP Technology Plan was prepared in 1985 as a supporting document to the HWMTP to provide a more detailed description of the technology needed to construct and operate a vitrification facility. The plan was updated and issued in 1986, and revised in 1987. This document is an annual update of the plan. The HWVP Technology Plan is limited in scope to technology that requires development or confirmation testing. Other expense-funded activities are not included. The relationship between the HWVP Technology Plan and other waste management issues addressed in the HWMTP is described in section 1.6 of this plan. 6 refs., 4 figs., 34 tabs

  1. INEL D ampersand D long-range plan

    International Nuclear Information System (INIS)

    Buckland, R.J.; Kenoyer, D.J.; LaBuy, S.A.

    1995-09-01

    This Long-Range Plan presents the Decontamination and Dismantlement (D ampersand D) Program planning status for facilities at the Idaho National Engineering Laboratory (INEL). The plan provides a general description of the D ampersand D Program objectives, management criteria, and policy; discusses current activities; and documents the INEL D ampersand D Program cost and schedule estimate projections for the next 15 years. Appendices are included that provide INEL D ampersand D project historical information, a comprehensive descriptive summary of each current D ampersand D surplus facility, and a summary database of all INEL contaminated facilities awaiting or undergoing the facility transition process

  2. Management control system description

    Energy Technology Data Exchange (ETDEWEB)

    Bence, P. J.

    1990-10-01

    This Management Control System (MCS) description describes the processes used to manage the cost and schedule of work performed by Westinghouse Hanford Company (Westinghouse Hanford) for the US Department of Energy, Richland Operations Office (DOE-RL), Richland, Washington. Westinghouse Hanford will maintain and use formal cost and schedule management control systems, as presented in this document, in performing work for the DOE-RL. This MCS description is a controlled document and will be modified or updated as required. This document must be approved by the DOE-RL; thereafter, any significant change will require DOE-RL concurrence. Westinghouse Hanford is the DOE-RL operations and engineering contractor at the Hanford Site. Activities associated with this contract (DE-AC06-87RL10930) include operating existing plant facilities, managing defined projects and programs, and planning future enhancements. This document is designed to comply with Section I-13 of the contract by providing a description of Westinghouse Hanford's cost and schedule control systems used in managing the above activities. 5 refs., 22 figs., 1 tab.

  3. 45 CFR 286.75 - What must be included in the Tribal Family Assistance Plan?

    Science.gov (United States)

    2010-10-01

    ... description of the employment opportunities available, in both the public and private sector, within and near... eligibility criteria the Tribe has established, which includes a definition of “needy family,” including income and resource limits and the Tribe's definition of “Tribal member family” or “Indian family.” (2) A...

  4. Heat pump planning handbook

    CERN Document Server

    Bonin, Jürgen

    2015-01-01

    The Heat Pump Planning Handbook contains practical information and guidance on the design, planning and selection of heat pump systems, allowing engineers, designers, architects and construction specialists to compare a number of different systems and options. Including detailed descriptions of components and their functions and reflecting the current state of technology this guide contains sample tasks and solutions as well as new model calculations and planning evaluations. Also economic factors and alternative energy sources are covered, which are essential at a time of rising heat costs. T

  5. Hanford Site Waste Management Plan

    International Nuclear Information System (INIS)

    1988-12-01

    The Hanford Site Waste Management Plan (HWMP) was prepared in accordance with the outline and format described in the US Department of Energy Orders. The HWMP presents the actions, schedules, and projected costs associated with the management and disposal of Hanford defense wastes, both radioactive and hazardous. The HWMP addresses the Waste Management Program. It does not include the Environmental Restoration Program, itself divided into the Environmental Restoration Remedial Action Program and the Decontamination and Decommissioning Program. The executive summary provides the basis for the plans, schedules, and costs within the scope of the Waste Management Program at Hanford. It summarizes fiscal year (FY) 1988 including the principal issues and the degree to which planned activities were accomplished. It further provides a forecast of FY 1989 including significant milestones. Section 1 provides general information for the Hanford Site including the organization and administration associated with the Waste Management Program and a description of the Site focusing on waste management operations. Section 2 and Section 3 describe radioactive and mixed waste management operations and hazardous waste management, respectively. Each section includes descriptions of the waste management systems and facilities, the characteristics of the wastes managed, and a discussion of the future direction of operations

  6. 24 CFR 1006.101 - Housing plan requirements.

    Science.gov (United States)

    2010-04-01

    ... assistance provided by the United States, including loans, grants, and mortgage insurance; (iv) A description... State of Hawaii, including the availability of housing from other public sources and private market... period covered by the plan, including transitional housing; homeless housing; college housing; and...

  7. NRC program for the resolution of generic issues related to nuclear power plants. (Includes plans for the resolution of ''unresolved safety issues'' pursuant to Section 210 of the Energy Reorganization Act of 1974, as amended)

    International Nuclear Information System (INIS)

    1977-12-01

    This report provides a description of the Nuclear Regulatory Commission's Program for the Resolution of Generic Issues Related to Nuclear Power Plants. The NRC program is of considerably broader scope than the ''Unresolved Safety Issues Plan'' required by Section 210. The NRC program does include plans for the resolution of ''Unresolved Safety Issues''; however, in addition, it includes generic tasks for the resolution of environmental issues, for the development of improvements in the reactor licensing process and for consideration of less conservative design criteria or operating limitations in areas where over conservatisms may be unnecessarily restrictive or costly

  8. Model for safety reports including descriptive examples; Mall foer saekerhetsrapporter med beskrivande exempel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    Several safety reports will be produced in the process of planning and constructing the system for disposal of high-level radioactive waste in Sweden. The present report gives a model, with detailed examples, of how these reports should be organized and what steps they should include. In the near future safety reports will deal with the encapsulation plant and the repository. Later reports will treat operation of the handling systems and the repository.

  9. National Waste Terminal Storage Program: information management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan to provide for the systematic processing of large amounts of internally prepared and externally acquired documentation that will accrue to the Office of Waste Isolation (OWI) during the next decade is outlined. The Information Management Plan of the National Waste Terminal Storage (NWTS) Program is based on time proven procedures developed by government and industry for the requirements determination, acquisition, and the administration of documentation. The NWTS Information Management Plan is designed to establish the basis for the planning, development, implemenation, operation and maintenance of the NWTS Information Management System. This plan will help assure that documentation meets required quality standards and that each organization's needs are reflected when soliciting documentation from subcontractors. An example would be the Quality Assurance documentation requirement necessary to comply with eventual NRC licensing regulations. The provisions of the NWTS Information Management Plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to OWI organizations for documentation prepared periodically for external dissemination

  10. Experimental program plan for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

  11. Experimental program plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included

  12. 11 CFR 116.7 - Debt settlement plans filed by terminating committees; Commission review.

    Science.gov (United States)

    2010-01-01

    ... description of the terms under which the creditor has extended credit to nonpolitical debtors of similar risk... settlement plan after the creditors included in the debt settlement plan have agreed to the settlement or... payments to the creditors included in the debt settlement plan until completion of Commission review. The...

  13. Career Planning Modules for the Officer Career Information and Planning System.

    Science.gov (United States)

    Phillips, Susan D.; And Others

    This discussion of the modules in an experimental computer-aided system for officer career information and planning system (OCIPS) includes the reasons for its development, a description of the seven modules, and the findings of a preliminary test of four of the modules for feasibility and credibility. Initially developed in response to a need…

  14. 2002 WIPP Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  15. Radiological control FY 1995 site support program plan WBS 6.7.2.4

    International Nuclear Information System (INIS)

    1994-09-01

    The 1995 Site Support Program Plan (SSPP) brings year planning and execution year planning into a single document. The plan presented consists of the following four major sections: Overview and Introduction - Health physics has been renamed Radiological Control (RadCon) with the role of protecting workers, the public and the environment from the harmful effects of radiation resulting from the DOE Hanford Site Operations; Cost Baselines which contains cost, technical and schedule baselines; Execution Year work Plan - cost summaries and detailed descriptions of the work to be done; Appendix - including brief description of other project activities directly coupled to RadCon

  16. Radiological control FY 1995 site support program plan WBS 6.7.2.4

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The 1995 Site Support Program Plan (SSPP) brings year planning and execution year planning into a single document. The plan presented consists of the following four major sections: Overview and Introduction - Health physics has been renamed Radiological Control (RadCon) with the role of protecting workers, the public and the environment from the harmful effects of radiation resulting from the DOE Hanford Site Operations; Cost Baselines which contains cost, technical and schedule baselines; Execution Year work Plan - cost summaries and detailed descriptions of the work to be done; Appendix - including brief description of other project activities directly coupled to RadCon.

  17. Reactor safety research program. A description of current and planned reactor safety research sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research

    International Nuclear Information System (INIS)

    1975-06-01

    The reactor safety research program, sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, is described in terms of its program objectives, current status, and future plans. Elements of safety research work applicable to water reactors, fast reactors, and gas cooled reactors are presented together with brief descriptions of current and planned test facilities. (U.S.)

  18. 75 FR 39493 - United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015

    Science.gov (United States)

    2010-07-09

    ... plan includes the USPTO's mission statement, vision statement and a description of the strategic goals... achieve its vision. Full details on how the USPTO plans to implement the strategic plan, including funding...] United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015 AGENCY: United States...

  19. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  20. Descriptive Research

    DEFF Research Database (Denmark)

    Wigram, Anthony Lewis

    2003-01-01

    Descriptive research is described by Lathom-Radocy and Radocy (1995) to include Survey research, ex post facto research, case studies and developmental studies. Descriptive research also includes a review of the literature in order to provide both quantitative and qualitative evidence of the effect...... starts will allow effect size calculations to be made in order to evaluate effect over time. Given the difficulties in undertaking controlled experimental studies in the creative arts therapies, descriptive research methods offer a way of quantifying effect through descriptive statistical analysis...

  1. Specific application for Oak Ridge National Laboratory dismantlement of Building 3004. Appendix A - Quality assurance plan; Appendix B - Records management plan

    International Nuclear Information System (INIS)

    1997-03-01

    This quality assurance (QA) plan defines the QA requirements for the dismantlement and removal of Building 3004 at Oak Ridge National Laboratory (ORNL). The building is a four-story wooden trained structure with wooden siding, which resides approximately 150 ft west of the Bulk Shielding Reactor, and only several feet away from the visitors entrance to the Graphite Reactor museum. Complete descriptions and sketches are in the Performance Specification document for this project. This project is being conducted as a non-CERCLA maintenance action. This plan is an appendix to the QA plan for the ORNL Environmental Restoration (ER) Program. ORNL/ER-225, which is the source of the project QA requirements, tailors those QA requirements to the specific needs of this project as defined in ORNL/ER-225. Project-specific description and organization are also provided in this plan. Appendix B, Records Management Plan, is included

  2. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What management plan must be included in a Teacher... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... appropriate, a management plan that includes a proposed multiyear workplan. (b) At a minimum, this workplan...

  3. Demand planning ve společnosti Farm Frites

    OpenAIRE

    Rosíková, Eva

    2009-01-01

    Theoretic part of thesis included short introduction into logistics, define question of demand planning and his role in SCM. In practical part is outlined function of SCM in Farm Frites company. Description of logistics chain, which is necessary part for understanding of whole proces of demand planning in company. Main object of thesis is to determine problems connected with demand planning and proposal of resolution of that problems in Farm Frites.

  4. 29 CFR 1952.160 - Description of the plan as initially approved.

    Science.gov (United States)

    2010-07-01

    ... include both occupational safety and occupational health, the latter on a developmental basis. The plan defines the covered occupational safety and health issues as defined by the Secretary of Labor in 29 CFR... Section 1952.160 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH...

  5. MCO Monitoring activity description

    International Nuclear Information System (INIS)

    SEXTON, R.A.

    1998-01-01

    Spent Nuclear Fuel remaining from Hanford's N-Reactor operations in the 1970s has been stored under water in the K-Reactor Basins. This fuel will be repackaged, dried and stored in a new facility in the 200E Area. The safety basis for this process of retrieval, drying, and interim storage of the spent fuel has been established. The monitoring of MCOS in dry storage is a currently identified issue in the SNF Project. This plan outlines the key elements of the proposed monitoring activity. Other fuel stored in the K-Reactor Basins, including SPR fuel, will have other monitoring considerations and is not addressed by this activity description

  6. Operational environmental monitoring plan for the waste isolation pilot plant

    International Nuclear Information System (INIS)

    Mercer, D.D.; Baker, P.L.; Cockman, J.S.; Fischer, N.T.; Flynn, D.T.; Harvill, J.P.; Knudtsen, K.L.; Louderbough, E.T.

    1989-01-01

    This plan defines the scope and extent of the WIPP effluent and environmental monitoring programs during the facility's operational life. It also discusses the quality assurance/quality control programs which ensure that samples collected and the resulting analytical data are representative of actual conditions at the WIPP site. This plan provides a comprehensive description of environmental activities at WIPP, including: a summary of environmental program information, including an update of the status of environmental permits and compliance activities; a description of the WIPP project and its mission; a description of the local environment, including demographics; a summary of applicable standards and regulatory requirements and brief discussions of potential exposure pathways, routine and accidental releases, and their consequences; a summary of the preoperational environmental monitoring and assessment activities and responses to the requirements (Appendix A) and guidelines presented in the ''Radiological Effluent Monitoring and Environmental Surveillance for US DOE Operations.'' 166 refs., 28 figs., 27 tabs

  7. Marketing plan for company X

    OpenAIRE

    Trishkina, Olga

    2014-01-01

    The aim of this master´s thesis is to make a structured marketing plan for company X, which provide tourism services in Finland. The thesis is done with qualitative method, which is the most suitable for marketing research, because it is mostly analyzing and description rather than statistical or numerical reports. In the theoretical part is studied secondary data of the topic, including research about marketing, marketing plan, customer relationship management, customers´ satisfaction a...

  8. National plan for the accelerated commercialization of solar energy. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-09-01

    After a brief profile of the Mid-American region and characterization of the residential and commercial markets and the industry of the region, a short description is given of a regional planning meeting held for the purpose of preparing input for the Mid-American section of the National Program for the Accelerated Commercialization of Solar Energy (NPAC) Implementation plans. For each of thirty-eight programs, the objective, rationale, task statement/description, evaluation measures, and implementor are given. The programs are in these areas: public education/awareness; education/training; legislative/regulatory; performance/analysis; design/planning;demonstrations; state interface; technology; information dissemination; legal and regulatory; analysis and assessment; and regional coordination. Two policy statements are included - one on cratering a solar society and the other recommending the expansion of the commercialization to encompass and include the concepts of utilization and popularization in the plan for the advancement of solar energy. (LEW)

  9. Representation-free description of light-pulse atom interferometry including non-inertial effects

    Energy Technology Data Exchange (ETDEWEB)

    Kleinert, Stephan, E-mail: stephan.kleinert@uni-ulm.de [Institut für Quantenphysik and Center for Integrated Quantum Science and Technology (IQST), Universität Ulm, Albert-Einstein-Allee 11, D-89081 Ulm (Germany); Kajari, Endre; Roura, Albert [Institut für Quantenphysik and Center for Integrated Quantum Science and Technology (IQST), Universität Ulm, Albert-Einstein-Allee 11, D-89081 Ulm (Germany); Schleich, Wolfgang P. [Institut für Quantenphysik and Center for Integrated Quantum Science and Technology (IQST), Universität Ulm, Albert-Einstein-Allee 11, D-89081 Ulm (Germany); Texas A& M University Institute for Advanced Study (TIAS), Institute for Quantum Science and Engineering (IQSE) and Department of Physics and Astronomy, Texas A& M University College Station, TX 77843-4242 (United States)

    2015-12-30

    Light-pulse atom interferometers rely on the wave nature of matter and its manipulation with coherent laser pulses. They are used for precise gravimetry and inertial sensing as well as for accurate measurements of fundamental constants. Reaching higher precision requires longer interferometer times which are naturally encountered in microgravity environments such as drop-tower facilities, sounding rockets and dedicated satellite missions aiming at fundamental quantum physics in space. In all those cases, it is necessary to consider arbitrary trajectories and varying orientations of the interferometer set-up in non-inertial frames of reference. Here we provide a versatile representation-free description of atom interferometry entirely based on operator algebra to address this general situation. We show how to analytically determine the phase shift as well as the visibility of interferometers with an arbitrary number of pulses including the effects of local gravitational accelerations, gravity gradients, the rotation of the lasers and non-inertial frames of reference. Our method conveniently unifies previous results and facilitates the investigation of novel interferometer geometries.

  10. Symbol-stream Combiner: Description and Demonstration Plans

    Science.gov (United States)

    Hurd, W. J.; Reder, L. J.; Russell, M. D.

    1984-01-01

    A system is described and demonstration plans presented for antenna arraying by symbol stream combining. This system is used to enhance the signal-to-noise ratio of a spacecraft signals by combining the detected symbol streams from two or more receiving stations. Symbol stream combining has both cost and performance advantages over other arraying methods. Demonstrations are planned on Voyager 2 both prior to and during Uranus encounter. Operational use is possible for interagency arraying of non-Deep Space Network stations at Neptune encounter.

  11. Technical architecture of ONC-approved plans for statewide health information exchange.

    Science.gov (United States)

    Barrows, Randolph C; Ezzard, John

    2011-01-01

    ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor "hybrid-federated" architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches.

  12. Waste receiving and processing plant control system; system design description

    Energy Technology Data Exchange (ETDEWEB)

    LANE, M.P.

    1999-02-24

    The Plant Control System (PCS) is a heterogeneous computer system composed of numerous sub-systems. The PCS represents every major computer system that is used to support operation of the Waste Receiving and Processing (WRAP) facility. This document, the System Design Description (PCS SDD), includes several chapters and appendices. Each chapter is devoted to a separate PCS sub-system. Typically, each chapter includes an overview description of the system, a list of associated documents related to operation of that system, and a detailed description of relevant system features. Each appendice provides configuration information for selected PCS sub-systems. The appendices are designed as separate sections to assist in maintaining this document due to frequent changes in system configurations. This document is intended to serve as the primary reference for configuration of PCS computer systems. The use of this document is further described in the WRAP System Configuration Management Plan, WMH-350, Section 4.1.

  13. Waste receiving and processing plant control system; system design description

    International Nuclear Information System (INIS)

    LANE, M.P.

    1999-01-01

    The Plant Control System (PCS) is a heterogeneous computer system composed of numerous sub-systems. The PCS represents every major computer system that is used to support operation of the Waste Receiving and Processing (WRAP) facility. This document, the System Design Description (PCS SDD), includes several chapters and appendices. Each chapter is devoted to a separate PCS sub-system. Typically, each chapter includes an overview description of the system, a list of associated documents related to operation of that system, and a detailed description of relevant system features. Each appendice provides configuration information for selected PCS sub-systems. The appendices are designed as separate sections to assist in maintaining this document due to frequent changes in system configurations. This document is intended to serve as the primary reference for configuration of PCS computer systems. The use of this document is further described in the WRAP System Configuration Management Plan, WMH-350, Section 4.1

  14. Descriptive data analysis.

    Science.gov (United States)

    Thompson, Cheryl Bagley

    2009-01-01

    This 13th article of the Basics of Research series is first in a short series on statistical analysis. These articles will discuss creating your statistical analysis plan, levels of measurement, descriptive statistics, probability theory, inferential statistics, and general considerations for interpretation of the results of a statistical analysis.

  15. 1993 baseline solid waste management system description

    International Nuclear Information System (INIS)

    Armacost, L.L.; Fowler, R.A.; Konynenbelt, H.S.

    1994-02-01

    Pacific Northwest Laboratory has prepared this report under the direction of Westinghouse Hanford Company. The report provides an integrated description of the system planned for managing Hanford's solid low-level waste, low-level mixed waste, transuranic waste, and transuranic mixed waste. The primary purpose of this document is to illustrate a collective view of the key functions planned at the Hanford Site to handle existing waste inventories, as well as solid wastes that will be generated in the future. By viewing this system as a whole rather than as individual projects, key facility interactions and requirements are identified and a better understanding of the overall system may be gained. The system is described so as to form a basis for modeling the system at various levels of detail. Model results provide insight into issues such as facility capacity requirements, alternative system operating strategies, and impacts of system changes (ie., startup dates). This description of the planned Hanford solid waste processing system: defines a baseline system configuration; identifies the entering waste streams to be managed within the system; identifies basic system functions and waste flows; and highlights system constraints. This system description will evolve and be revised as issues are resolved, planning decisions are made, additional data are collected, and assumptions are tested and changed. Out of necessity, this document will also be revised and updated so that a documented system description, which reflects current system planning, is always available for use by engineers and managers. It does not provide any results generated from the many alternatives that will be modeled in the course of analyzing solid waste disposal options; such results will be provided in separate documents

  16. Planning for greater confinement disposal

    International Nuclear Information System (INIS)

    Gilbert, T.L.; Luner, C.; Meshkov, N.K.; Trevorrow, L.E.; Yu, C.

    1985-01-01

    A report that provides guidance for planning for greater-confinement disposal (GCD) of low-level radioactive waste is being prepared. The report addresses procedures for selecting a GCD technology and provides information for implementing these procedures. The focus is on GCD; planning aspects common to GCD and shallow-land burial are covered by reference. Planning procedure topics covered include regulatory requirements, waste characterization, benefit-cost-risk assessment and pathway analysis methodologies, determination of need, waste-acceptance criteria, performance objectives, and comparative assessment of attributes that support these objectives. The major technologies covered include augered shafts, deep trenches, engineered structures, hydrofracture, improved waste forms, and high-integrity containers. Descriptive information is provided, and attributes that are relevant for risk assessment and operational requirements are given. 10 refs., 3 figs., 2 tabs

  17. 29 CFR 1952.380 - Description of the plan.

    Science.gov (United States)

    2010-07-01

    ... OSHA standards exist. The plan provides that program personnel will be employed under a merit system... version of OSHA standards be made available within three years of plan approval. (c) The Puerto Rico Act... against employers for violations of standards and orders; and review of citations by a hearing examiner...

  18. 2002 Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2002-01-01

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance

  19. Business plan for a startup: Yen Viet Company

    OpenAIRE

    Truong, Hang

    2015-01-01

    The main objective of this thesis is to create a business plan for Yen Viet Company, to help the founder to discover whether the business idea is feasible or not. The business plan consists of these elements: executive summary, description of the company, business strategy and industry profile, description of the firm’s products and services, marketing strategy, description of the management team, financial plan, and financial plan. Exploratory analysis is chosen as the research method i...

  20. 30 CFR 780.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Existing structures. 780.12... PLAN § 780.12 Operation plan: Existing structures. (a) Each application shall contain a description of... and reclamation operation. The description shall include— (1) Location; (2) Plans of the structure...

  1. Subsurface conditions description for the S-SX waste management area

    International Nuclear Information System (INIS)

    WOOD, M.I.

    1999-01-01

    This document provides a discussion of the subsurface conditions relevant to the occurrence and migration of contaminants in the vadose zone and groundwater underlying the 241-5 and 241-SX tank farms This document provides a concise summary of existing information in support of characterization planning This document includes a description of the available environmental contamination data and a limited qualitative interpretation of these data

  2. Sanitary landfill groundwater quality assessment plan Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Wells, D.G.; Cook, J.W.

    1990-06-01

    This assessment monitoring plan has been prepared in accordance with the guidance provided by the SCDHEC in a letter dated December 7, 1989 from Pearson to Wright and a letter dated October 9, 1989 from Keisler to Lindler. The letters are included a Appendix A, for informational purposes. Included in the plan are all of the monitoring data from the landfill monitoring wells for 1989, and a description of the present monitoring well network. The plan proposes thirty-two new wells and an extensive coring project that includes eleven soil borings. Locations of the proposed wells attempt to follow the SCDHEC guidelines and are downgradient, sidegradient and in the heart of suspected contaminant plumes. Also included in the plan is the current Savannah River Site Sampling and Analysis Plan and the well construction records for all of the existing monitoring wells around the sanitary landfill.

  3. 12 CFR 570.3 - Filing of safety and soundness compliance plan.

    Science.gov (United States)

    2010-01-01

    ... compliance plan shall include a description of the steps the savings association will take to correct the deficiency and the time within which those steps will be taken. (c) Review of safety and soundness compliance... plan. (a) Schedule for filing compliance plan—(1) In general. A savings association shall file a...

  4. 42 CFR 417.155 - How the HMO option must be included in the health benefits plan.

    Science.gov (United States)

    2010-10-01

    ... printed materials that meet the requirements of § 417.124(b). (ii) Access may not be more restrictive or... benefits plan. 417.155 Section 417.155 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT... Organizations in Employee Health Benefits Plans § 417.155 How the HMO option must be included in the health...

  5. Prospective descriptive study of the toxicity of CAPOX plan in systemic treatment of colorectal cancer

    International Nuclear Information System (INIS)

    Aghazarian, M; Larranaga, J; Reyes, G; Heinzen, S; Ferrero, L; Lasalvia, E; Echague, P; Estevez, F; Citrin, E; Viola, A.

    2010-01-01

    increased the number of LDH. Two patients had hyperbilirubinaemia, one grade 2 and one grade 3 to predominance of bilirubin indirect. Five patients had to discontinue treatment due to toxicity of the plan: 2 gastrointestinal (diarrhea G3), 2 and liver function (elevated bilirubin level 2 and 3) 1 cardiovascular (CF II effort angina). Of these 5 cases, in 4 patients the dose was reduced in the first instance and then rotate to another chemotherapy regimen and only patient who presented effort angina permanently stopped treatment. Conclusions: This is the first prospective descriptive work in the INCA to describe the toxicity of treatment a prevalent disease such as CCR. The most frequent toxicities observed in our study similar to those described in the international literature. Most adverse events occurred were mild to moderate (grade 1 and 2) where the toxicities grade 3 and more frequent gastrointestinal and hepatic level 4. The number Low of patients included could be due to the recent introduction of new drugs in the treatment of Metastatic RCC not included in this study as well as the non-inclusion of capecitabine also mono drug often used in metastatic CRC in elderly patients

  6. Demystifying the Business Plan Process: An Introductory Guide.

    Science.gov (United States)

    Kuratko, Donald F.

    This article is designed as the starting point for writing a business plan. It first describes what a business plan is. These benefits are discussed: financing, increasing knowledge, preventing poor investment, and planning. A brief description follows of the 10 components of a business plan: executive summary; business description; marketing;…

  7. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  8. Site study plan for ecology, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary Draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Ecology Site Study Plan describes a field program consisting of studies which include surveys for endangered, threatened, and candidate species; vegetation characterization, including mapping and cover typing, plant succession, wetlands description, and preexisting stresses; and wildlife community characterization, including availability and quality of habitats and descriptions of mammal, bird, reptile, amphibian, and invertebrate populations. The plan for each study describes the need for the study, study design, data management and use, schedule and personnel requirements, and quality assurance. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document (SRP-RD). 83 refs., 3 tabs

  9. 41 CFR 102-37.150 - What must a State legislature include in the plan?

    Science.gov (United States)

    2010-07-01

    ... set forth in Appendix B of this part. It may also include in the plan other provisions not inconsistent with the purposes of title 40 of the United States Code and the requirements of this part. [67 FR...

  10. 1999 vadose zone monitoring plan and guidance for subsequent years

    International Nuclear Information System (INIS)

    Horton, D.G.; Reidel, S.P.; Last, G.V.

    1998-08-01

    The US Department of Energy's Hanford Site has the most diverse and largest amounts of radioactive waste in the US. The majority of the liquid waste was disposed to the soil column where much of it remains today. This document provides the rationale and general framework for vadose zone monitoring at cribs, ditches, trenches and other disposal facilities to detect new sources of contamination and track the movement of existing contamination in the vadose zone for the protection of groundwater. The document provides guidance for subsequent site-specific vadose zone monitoring plans and includes a brief description of past vadose monitoring activities (Chapter 3); the results of the Data Quality Objective process used for this plan (Chapter 4); a prioritization of liquid waste disposal sites for vadose monitoring (Chapter 5 and Appendix B); a general Monitoring and Analysis Plan (Chapter 6); a general Quality Assurance Project Plan (Appendix A), and a description of vadose monitoring activities planned for FY 1999 (Appendix C)

  11. 42 CFR 495.332 - State Medicaid health information technology (HIT) plan requirements.

    Science.gov (United States)

    2010-10-01

    ... and strategic plan for the next 5 years. (2) A description of how the State Medicaid HIT plan will be... processes that enable improved program administration for the Medicaid enterprise; (ii) Includes business... used certified EHR technology during the EHR reporting period, and that they have adopted, implemented...

  12. Microscopic description of production cross sections including deexcitation effects

    Science.gov (United States)

    Sekizawa, Kazuyuki

    2017-07-01

    Background: At the forefront of the nuclear science, production of new neutron-rich isotopes is continuously pursued at accelerator laboratories all over the world. To explore the currently unknown territories in the nuclear chart far away from the stability, reliable theoretical predictions are inevitable. Purpose: To provide a reliable prediction of production cross sections taking into account secondary deexcitation processes, both particle evaporation and fission, a new method called TDHF+GEMINI is proposed, which combines the microscopic time-dependent Hartree-Fock (TDHF) theory with a sophisticated statistical compound-nucleus deexcitation model, GEMINI++. Methods: Low-energy heavy ion reactions are described based on three-dimensional Skyrme-TDHF calculations. Using the particle-number projection method, production probabilities, total angular momenta, and excitation energies of primary reaction products are extracted from the TDHF wave function after collision. Production cross sections for secondary reaction products are evaluated employing GEMINI++. Results are compared with available experimental data and widely used grazing calculations. Results: The method is applied to describe cross sections for multinucleon transfer processes in 40Ca+124Sn (Ec .m .≃128.54 MeV ), 48Ca+124Sn (Ec .m .≃125.44 MeV ), 40Ca+208Pb (Ec .m .≃208.84 MeV ), 58Ni+208Pb (Ec .m .≃256.79 MeV ), 64Ni+238U (Ec .m .≃307.35 MeV ), and 136Xe+198Pt (Ec .m .≃644.98 MeV ) reactions at energies close to the Coulomb barrier. It is shown that the inclusion of secondary deexcitation processes, which are dominated by neutron evaporation in the present systems, substantially improves agreement with the experimental data. The magnitude of the evaporation effects is very similar to the one observed in grazing calculations. TDHF+GEMINI provides better description of the absolute value of the cross sections for channels involving transfer of more than one proton, compared to the grazing

  13. Technical planning activity: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  14. Technical planning activity: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements

  15. Language Planning and Planned Languages: How Can Planned Languages Inform Language Planning?

    Directory of Open Access Journals (Sweden)

    Humphrey Tonkin

    2015-04-01

    Full Text Available The field of language planning (LP has largely ignored planned languages. Of classic descriptions of LP processes, only Tauli (preceded by Wüster suggests that planned languages (what Wüster calls Plansprache might bear on LP theory and practice. If LP aims "to modify the linguistic behaviour of some community for some reason," as Kaplan and Baldauf put it, creating a language de novo is little different. Language policy and planning are increasingly seen as more local and less official, and occasionally more international and cosmopolitan. Zamenhof's work on Esperanto provides extensive material, little studied, documenting the formation of the language and linking it particularly to issues of supranational LP. Defining LP decision-making, Kaplan & Baldauf begin with context and target population. Zamenhof's Esperanto came shortly before Ben-Yehuda's revived Hebrew. His target community was (mostly the world's educated elite; Ben-Yehuda's was worldwide Jewry. Both planners were driven not by linguistic interest but by sociopolitical ideology rooted in reaction to anti-Semitism and imbued with the idea of progress. Their territories had no boundaries, but were not imaginary. Function mattered as much as form (Haugen's terms, status as much as corpus. For Zamenhof, status planning involved emphasis on Esperanto's ownership by its community - a collective planning process embracing all speakers (cf. Hebrew. Corpus planning included a standardized European semantics, lexical selectivity based not simply on standardization but on representation, and the development of written, and literary, style. Esperanto was successful as linguistic system and community language, less as generally accepted lingua franca. Its terminology development and language cultivation offers a model for language revival, but Zamenhof's somewhat limited analysis of language economy left him unprepared to deal with language as power.

  16. Commissioning plans for SSC linac

    International Nuclear Information System (INIS)

    Hurd, J.W.; Aprile, R.L.; Chang, C.R.; Crist, C.E.; Cutler, R.I.; Funk, L.W.; Guy, F.W.; Leifeste, G.T.; Raparia, D.; Saadatmand, K.; Sethi, R.C.; Swenson, D.A.; Tooker, J.; Yao, C.G.

    1992-01-01

    Presented are the general description of the SSC linac and the plans for commissioning. Sections of the linac are installed, tested, and beam commissioned in a serial approach. A specialized set of diagnostics is used to characterize the beam through each section. In addition to the standard diagnostic set, plans call for the use of a bunch shape monitor and x-ray spectrometer. Streak camera and digital imaging diagnostics will be developed. The commissioning plan is folded into the general linac project schedule to show the relation between delivery, staging, installation, conditioning, and actual commissioning with beam. These plans form the basis for coordination between the various organizations responsible for different elements of the linac including the technical components, infrastructure, and temporary staging and operation facilities. (Author) 2 figs., 17 refs

  17. Background Information for the Nevada National Security Site Integrated Sampling Plan, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene; Marutzky, Sam

    2014-12-01

    This document describes the process followed to develop the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan). It provides the Plan’s purpose and objectives, and briefly describes the Underground Test Area (UGTA) Activity, including the conceptual model and regulatory requirements as they pertain to groundwater sampling. Background information on other NNSS groundwater monitoring programs—the Routine Radiological Environmental Monitoring Plan (RREMP) and Community Environmental Monitoring Program (CEMP)—and their integration with the Plan are presented. Descriptions of the evaluations, comments, and responses of two Sampling Plan topical committees are also included.

  18. Health impact assessment in planning: Development of the design for health HIA tools

    International Nuclear Information System (INIS)

    Forsyth, Ann; Slotterback, Carissa Schively; Krizek, Kevin J.

    2010-01-01

    How can planners more systematically incorporate health concerns into practical planning processes? This paper describes a suite of health impact assessment tools (HIAs) developed specifically for planning practice. Taking an evidence-based approach the tools are designed to fit into existing planning activities. The tools include: a short audit tool, the Preliminary Checklist; a structured participatory workshop, the Rapid HIA; an intermediate health impact assessment, the Threshold Analysis; and a set of Plan Review Checklists. This description provides a basis for future work including assessing tool validity, refining specific tools, and creating alternatives.

  19. CITATION ANALYSIS OF URBAN PLANNING SCHOLARS IN THE U.S.

    Directory of Open Access Journals (Sweden)

    Sanchez Thomas W

    2015-03-01

    Full Text Available This article provides a complete citation analysis for the field of urban planning in the U.S. Urban planning is multi-disciplinary with a rich tradition of debate about the knowledge domain of both research and practice. Urban planning includes consideration of social, economic, technological, environmental, and political systems that are highly sophisticated, which therefore has an extensive body of scholarship. The article argues that Google Scholar is an appropriate source of citation data for urban planning and includes a brief example of one urban planning scholar to demonstrate GS citation patterns. This is followed by the results of a descriptive analysis showing general patterns of citation activity for urban planning schools. A greater depth of analysis is required to better understand the dynamics of these scholarly activities.

  20. Program Plan: field radionuclide migration studies in Climax granite

    International Nuclear Information System (INIS)

    Isherwood, D.; Raber, E.; Coles, D.; Stone, R.

    1980-01-01

    This Program Plan describes the field radionuclide migration studies we plan to conduct in the Climax granite at the Nevada Test Site. Laboratory support studies are included to help us understand the geochemical and hydrologic processes involved in the field. The Program Plan begins with background information (Section 1) on how this program fits into the National Waste Terminal Storage Program Plan and discusses the needs for field studies of this type. The objectives stated in Section 2 are in direct response to these needs, particularly the need to determine whether laboratory studies accurately reflect actual field conditions and the need for field testing to provide a data base for verification of hydrologic and mass transport models. The technical scope (Section 3) provides a work breakdown structure that integrates the various activities and establishes a base for the technical approach described in Section 4. Our approach combines an interactive system of field and laboratory migration experiments with the use of hydrologic models for pre-test predictions and data interpretation. Section 5 on program interfaces identifies how information will be transferred to other related DOE projects. A schedule of activities and major milestones (Section 6) and the budget necessary to meet the project objectives (Section 7) are included in the Program Plan. Sections 8 and 9 contain brief descriptions of how the technical and program controls will be established and maintained and an outline of our quality assurance program. This program plan is an initial planning document and provides a general description of activities. An Engineering Test Plan containing detailed experimental test plans, an instrumentation plan and equipment design drawings will be published as a separate document

  1. The content of nurse unit managers' work: a descriptive study using daily activity diaries.

    Science.gov (United States)

    Sveinsdóttir, Herdís; Blöndal, Katrín; Jónsdóttir, Heiður Hrund; Bragadóttir, Helga

    2017-09-07

    NUMs' job description in Icelandic hospitals has been revised and now also includes managerial and financial responsibilities. To describe the actual work activities of nurse unit managers (NUMs) in surgical and internal medicine services as self-documented and reflected in their job description. Prospective exploratory study. The study's setting was the largest hospital in Iceland. Data were collected over 7 days from NUMs working on surgical and medical units with an activity diary listing five domains and 41 activities: 'management and planning' (seven activities), 'staff responsibility (seven activities), 'direct clinical work' (five activities), 'service' (12 activities) and 'other' (nine activities). The managers' spent most of their time within the 'other' domain (32% of their time), then the next significant amount of time on 'management and planning' and 'clinical nursing' (19%), and the least amount of time on 'service' (14%). All reported working on two or more activities simultaneously. NUMs made erroneous estimations approximately half of the time about the domain they spent most of their time in and their satisfaction with their work each day varied greatly. The work of NUMs is highly diverse, including undefined miscellaneous tasks and clinical work beyond their job description. © 2017 Nordic College of Caring Science.

  2. A new kinetic description for turbulent collisions including mode-coupling

    International Nuclear Information System (INIS)

    Misguich, J.H.; Tchen, C.M.

    1982-07-01

    The usual introduction of higher-order mode-coupling terms in the description of turbulent collisions beyond usual Renormalized Quasi-Linear approximation (RQL) is briefly analyzed. Here new results are derived in the framework of the general kinetic theory, and the equivalence is proved with the long time limit of simple results deduced from the Vlasov equation. The correction to the RQL turbulent collision term is analyzed and a new approximation is proposed. Turbulent collisions are also described by perturbation around the Lagrangian autocorrelation of fluctuating fields. For an homogeneous turbulence, however, the asymptotic integral of this Lagrangian autocorrelation vanishes identically, similarly to what occurs in Brownian motion. For inhomogeneous turbulence this method can nevertheless be used, and higher-order mode-coupling terms can be interpreted as a shielding of elementary Lagrangian turbulent collisions

  3. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 9, Index

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules.

  4. 29 CFR 2520.104b-2 - Summary plan description.

    Science.gov (United States)

    2010-07-01

    ... welfare plan), required by section 104(b)(1) of the Act, the administrator of an employee benefit plan... to participants and beneficiaries have been completed; and (ii) In the case of an employee welfare... Labor Regulations Relating to Labor (Continued) EMPLOYEE BENEFITS SECURITY ADMINISTRATION, DEPARTMENT OF...

  5. Impacted material placement plans

    International Nuclear Information System (INIS)

    Hickey, M.J.

    1997-01-01

    Impacted material placement plans (IMPP) are documents identifying the essential elements in placing remediation wastes into disposal facilities. Remediation wastes or impacted material(s) are those components used in the construction of the disposal facility exclusive of the liners and caps. The components might include soils, concrete, rubble, debris, and other regulatory approved materials. The IMPP provides the details necessary for interested parties to understand the management and construction practices at the disposal facility. The IMPP should identify the regulatory requirements from applicable DOE Orders, the ROD(s) (where a part of a CERCLA remedy), closure plans, or any other relevant agreements or regulations. Also, how the impacted material will be tracked should be described. Finally, detailed descriptions of what will be placed and how it will be placed should be included. The placement of impacted material into approved on-site disposal facilities (OSDF) is an integral part of gaining regulatory approval. To obtain this approval, a detailed plan (Impacted Material Placement Plan [IMPP]) was developed for the Fernald OSDF. The IMPP provides detailed information for the DOE, site generators, the stakeholders, regulatory community, and the construction subcontractor placing various types of impacted material within the disposal facility

  6. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  7. 300-FF-1 remedial design report/remedial action work plan

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes.

  8. 300-FF-1 remedial design report/remedial action work plan

    International Nuclear Information System (INIS)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes

  9. Description and Rationale for the Planning, Monitoring, and Implementation (PMI) Model: Description.

    Science.gov (United States)

    Ford, Valeria A.

    The design of the Planning, Monitoring, and Implementation Model (PMI) and the aspects of the model that make it useful in public schools are the topics of this paper. After the objectives of a program or operation have been identified, the model specifies three additional pieces of information that are needed for an evaluation: inputs, processes,…

  10. Crosswalking EAD: Collaboration in Archival Description

    Directory of Open Access Journals (Sweden)

    Amy McCrory

    2005-09-01

    Full Text Available Different library departments must work together, both formally and informally, in implementing encoded archival description and in repackaging descriptive information about archival collections to other formats, particularly machine-readable cataloging. The authors, one a technical services librarian and the other a special collections archivist, describe their experiences collaborating in these processes at The Ohio State University. Although other institutions may differ in their organizational structure, the authors hope to provide technical guidance, as well as a model of collaboration between archivists and technical services personnel. Careful dialogue and planning are essential to transcend the traditional divide between archival and library descriptive practices and systems.

  11. Predicting Facebook users' online privacy protection: risk, trust, norm focus theory, and the theory of planned behavior.

    Science.gov (United States)

    Saeri, Alexander K; Ogilvie, Claudette; La Macchia, Stephen T; Smith, Joanne R; Louis, Winnifred R

    2014-01-01

    The present research adopts an extended theory of the planned behavior model that included descriptive norms, risk, and trust to investigate online privacy protection in Facebook users. Facebook users (N = 119) completed a questionnaire assessing their attitude, subjective injunctive norm, subjective descriptive norm, perceived behavioral control, implicit perceived risk, trust of other Facebook users, and intentions toward protecting their privacy online. Behavior was measured indirectly 2 weeks after the study. The data show partial support for the theory of planned behavior and strong support for the independence of subjective injunctive and descriptive norms. Risk also uniquely predicted intentions over and above the theory of planned behavior, but there were no unique effects of trust on intentions, nor of risk or trust on behavior. Implications are discussed.

  12. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    2000-01-01

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility

  13. Planning for School Transition: An Ecological-Developmental Approach.

    Science.gov (United States)

    Diamond, Karen E.; And Others

    1988-01-01

    The paper describes an ecological-developmental model for planning a child's transition from a preschool special education program to a public school classroom. The model stresses interactions between the various environments in which the child functions. A description of a preschool transition program based on the model is also included.…

  14. Research Plan of the Operations Research Center and Department of Systems Engineering for the Academic Year 2005

    National Research Council Canada - National Science Library

    Kwinn, Michael

    2004-01-01

    ...) for the Academic Year 04-05. The research plan includes a statement of purpose for research which supports DSE and the ORCEN, a description of the two organizations, a list of the key personnel responsible for executing the plan...

  15. Positive behavioral support planning in the inpatient treatment of severe disruptive behaviors: A description of service features.

    Science.gov (United States)

    Hamlett, Nakia M; Carr, Erika R; Hillbrand, Marc

    2016-05-01

    Positive behavior support (PBS) plans are increasingly used on inpatient units to assess and treat serious and dangerous behaviors displayed by patients with serious psychiatric impairment. A contemporary extension of traditional applied behavior analytic procedures, PBS plans integrate theories from several domains with perspectives on community psychology, positive psychology, and recovery-oriented care. Because there is little evidence to suggest that more invasive, punitive disciplinary strategies lead to long-term positive behavioral change (Parkes, 1996), PBS plans have emerged as an alternative to the use of seclusion and restraint or other forms of restrictive measures typically used on inpatient psychiatric units (Hammer et al., 2011). Moreover, PBS plans are a preferred method of intervention because more invasive interventions often cause more harm than good to all involved (Elliott et al., 2005). This article seeks to provide an integrated framework for the development of positive behavior support plans in inpatient psychiatric settings. In addition to explicating the philosophy and core elements of PBS plans, this work includes discussion of the didactic and pragmatic aspects of training clinical staff in inpatient mental health settings. A case vignette is included for illustration and to highlight the use of PBS plans as a mechanism for helping patients transition to less restrictive settings. This work will add to the scant literature examining the use of positive behavioral support plans in inpatient psychiatric settings. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  16. Planning for Student Assessment: Participant's Handbook. Bilingual Evaluation Technical Assistance, Workshop III.

    Science.gov (United States)

    California Univ., Los Angeles. Center for the Study of Evaluation.

    This participant's handbook is designed to be used in conjunction with a workshop for planning bilingual student assessment. The following materials are included: (1) simulation materials, including descriptions of simulated programs, tests, test manuals, and printouts; (2) checklists, diagrams, and charts illustrating important points of the…

  17. RISMC Toolkit and Methodology Research and Development Plan for External Hazards Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Justin Leigh [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-03-01

    This report includes the description and development plan for a Risk Informed Safety Margins Characterization (RISMC) toolkit and methodology that will evaluate multihazard risk in an integrated manner to support the operating nuclear fleet.

  18. RISMC Toolkit and Methodology Research and Development Plan for External Hazards Analysis

    International Nuclear Information System (INIS)

    Coleman, Justin Leigh

    2016-01-01

    This report includes the description and development plan for a Risk Informed Safety Margins Characterization (RISMC) toolkit and methodology that will evaluate multihazard risk in an integrated manner to support the operating nuclear fleet.

  19. Oak Ridge reservation land-use plan

    Energy Technology Data Exchange (ETDEWEB)

    Bibb, W. R.; Hardin, T. H.; Hawkins, C. C.; Johnson, W. A.; Peitzsch, F. C.; Scott, T. H.; Theisen, M. R.; Tuck, S. C.

    1980-03-01

    This study establishes a basis for long-range land-use planning to accommodate both present and projected DOE program requirements in Oak Ridge. In addition to technological requirements, this land-use plan incorporates in-depth ecological concepts that recognize multiple uses of land as a viable option. Neither environmental research nor technological operations need to be mutually exclusive in all instances. Unique biological areas, as well as rare and endangered species, need to be protected, and human and environmental health and safety must be maintained. The plan is based on the concept that the primary use of DOE land resources must be to implement the overall DOE mission in Oak Ridge. This document, along with the base map and overlay maps, provides a reasonably detailed description of the DOE Oak Ridge land resources and of the current and potential uses of the land. A description of the land characteristics, including geomorphology, agricultural productivity and soils, water courses, vegetation, and terrestrial and aquatic animal habitats, is presented to serve as a resource document. Essentially all DOE land in the Oak Ridge area is being fully used for ongoing DOE programs or has been set aside as protected areas.

  20. Financial Therapy and Planning for Families with Special Needs Children

    Directory of Open Access Journals (Sweden)

    Mitzi Lauderdale

    2012-06-01

    Full Text Available This study examines factors associated with the likelihood of having a plan that includes a special needs trust among families that have disabled minor children. Descriptive analyses indicate that the top two reasons families provide for not having a plan are the inability to save and no perceived need. Among families that do indicate having a plan, most do not include a special needs trust. Multivariate analyses reveal that professional involvement (financial, legal, and mental health professionals is a key factor to increasing the likelihood of having a plan with a special needs trust. Families that have met with a financial advisor are 23 times more likely, and families who are encouraged to create a plan by a mental health professional are almost three times more likely, to have a plan that includes a special needs trust. Results from this study suggest that financial therapists are uniquely positioned to educate and ensure that appropriate plans are in place to provide for the future of children with special needs.

  1. Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant

    International Nuclear Information System (INIS)

    COX, G.J.

    1999-01-01

    This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP. This plan presents the overall description, mission, work scope, and planning for the Plutonium Finishing Plant (PFP) Maintain Safe and Compliant Conditions Project at PFP. This project includes all tasks required to maintain the safety boundary for the PFP Complex, except for the 2736-2 Vault Complex and the 234-52 vaults and vault-type rooms. The intent of this plan is to describe how this project will be managed and integrated with the stabilization, and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines that will manage the execution of this project. It describes the organizational approach and roles/responsibilities implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action

  2. Buried Waste Integrated Demonstration Commercialization Action Plans second quarter, FY-94

    International Nuclear Information System (INIS)

    Kaupanger, R.M.

    1994-06-01

    The Federal Government is extremely good at creating knowledge and developing new technology. However, our declining market share in many industries points to a weakness in our ability to successfully commercialize new discoveries. BWID assembled a team of qualified experts with expertise in technology transfer and broad-based technology knowledge to assist with this effort. Five new technologies were chosen to develop commercialization action plans. They include Dig-Face Characterization, Imaging Infrared Interferometer for Waste Characterization, Tensor Magnetic Gradiometer, Very Early Time Electromagnetic System, and Virtual Environment Generation of Buried Waste. Each plan includes a short description of the technology, a market overview, a list of potential customers, a description of competitors and the technology's competitive advantage, the status of intellectual property, the status of technology transfer, a table of action items, commercialization contacts, and program contacts

  3. Social influence in the theory of planned behaviour: the role of descriptive, injunctive, and in-group norms.

    Science.gov (United States)

    White, Katherine M; Smith, Joanne R; Terry, Deborah J; Greenslade, Jaimi H; McKimmie, Blake M

    2009-03-01

    The present research investigated three approaches to the role of norms in the theory of planned behaviour (TPB). Two studies examined the proposed predictors of intentions to engage in household recycling (Studies 1 and 2) and reported recycling behaviour (Study 1). Study 1 tested the impact of descriptive and injunctive norms (personal and social) and the moderating role of self-monitoring on norm-intention relations. Study 2 examined the role of group norms and group identification and the moderating role of collective self on norm-intention relations. Both studies demonstrated support for the TPB and the inclusion of additional normative variables: attitudes; perceived behavioural control; descriptive; and personal injunctive norms (but not social injunctive norm) emerged as significant independent predictors of intentions. There was no evidence that the impact of norms on intentions varied as a function of the dispositional variables of self-monitoring (Study 1) or the collective self (Study 2). There was support, however, for the social identity approach to attitude-behaviour relations in that group norms predicted recycling intentions, particularly for individuals who identified strongly with the group. The results of these two studies highlight the critical role of social influence processes within the TPB and the attitude-behaviour context.

  4. South Korea: Language Policy and Planning in the Making

    Science.gov (United States)

    Song, Jae Jung

    2012-01-01

    This monograph discusses South Korea's language situation in a language policy and planning context. This monograph consists of four parts. Part 1 presents a genetic, typological and sociolinguistic description of South Korea's national language, and an overview of minority languages, including English as well as other languages, recently…

  5. Guidelines for Description

    NARCIS (Netherlands)

    Links, P.; Horsman, Peter; Kühnel, Karsten; Priddy, M.; Reijnhoudt, Linda; Merenmies, Mark

    2013-01-01

    The Guidelines follow the conceptual metadata model (deliverable 17.2). They include guidelines for description of collection-holding institutions, document collections, organisations, personalities, events, camps and ghettos. As much as possible the guidelines comply with the descriptive standards

  6. Automated Procurement System (APS) revised project management plan (DS-03)

    Science.gov (United States)

    Murphy, Diane R.

    1995-01-01

    The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  7. Statistical Analysis Plan

    DEFF Research Database (Denmark)

    Ris Hansen, Inge; Søgaard, Karen; Gram, Bibi

    2015-01-01

    This is the analysis plan for the multicentre randomised control study looking at the effect of training and exercises in chronic neck pain patients that is being conducted in Jutland and Funen, Denmark. This plan will be used as a work description for the analyses of the data collected....

  8. Teacher Attitudes on Including Students with Behavior Intervention Plans in a High-School Inclusive Classroom

    Science.gov (United States)

    Tucker, Thurman D.

    2017-01-01

    This research examined attitudes to determine factors influencing teachers' attitudes toward including students with behavior intervention plans in inclusive high-school classrooms. For Research Question 1 one-way ANOVAs analyzed quantitative data with no significant differences found and qualitative data discovered common patterns that BIPs are…

  9. Physics 3204. Course Description.

    Science.gov (United States)

    Newfoundland and Labrador Dept. of Education.

    A description of the physics 3204 course in Newfoundland and Labrador is provided. The description includes: (1) statement of purpose, including general objectives of science education; (2) a list of six course objectives; (3) course content for units on sound, light, optical instruments, electrostatics, current electricity, Michael Faraday and…

  10. Subsurface Conditions Description of the B and BX and BY Waste Management Area

    Energy Technology Data Exchange (ETDEWEB)

    WOOD, M.I.

    2000-03-13

    This document provides a discussion of the subsurface conditions relevant to the occurrence and migration of contaminants in the vadose zone and groundwater underlying the 241-B, -BX, and -BY tank farms. This document provides a concise summary of existing information in support of characterization planning. This document includes a description of the available environmental contamination data and a limited, qualitative interpretation of these data.

  11. Subsurface Conditions Description of the B and BX and BY Waste Management Area

    International Nuclear Information System (INIS)

    WOOD, M.I.

    2000-01-01

    This document provides a discussion of the subsurface conditions relevant to the occurrence and migration of contaminants in the vadose zone and groundwater underlying the 241-B, -BX, and -BY tank farms. This document provides a concise summary of existing information in support of characterization planning. This document includes a description of the available environmental contamination data and a limited, qualitative interpretation of these data

  12. The ground based plan

    International Nuclear Information System (INIS)

    1989-01-01

    The paper presents a report of ''The Ground Based Plan'' of the United Kingdom Science and Engineering Research Council. The ground based plan is a plan for research in astronomy and planetary science by ground based techniques. The contents of the report contains a description of:- the scientific objectives and technical requirements (the basis for the Plan), the present organisation and funding for the ground based programme, the Plan, the main scientific features and the further objectives of the Plan. (U.K.)

  13. A qualitative descriptive exploration of the educational and career plans of early career neonatal nurses and midwives: An Irish perspective.

    Science.gov (United States)

    Coughlan, Linda Martina; Patton, Declan

    2018-01-01

    The scarcity of appropriately qualified nurses and midwives is a major obstacle in achieving an effective health system. Neonatal nurses and midwives require a high level of skill and education to fulfil their role. It is also an area that sees high staff turnover rates. For this study a descriptive qualitative approach was used to ascertain early career neonatal nurses' and midwives' experiences of further education, their future career plans, and their perceived facilitators and barriers to further education and career progression. After receiving ethical approval, twelve nurses and midwives were recruited across three tertiary level neonatal units in Ireland. Semi structured interviews were carried out and interview transcripts were subsequently analysed using Attride-Stirling's (2001) Thematic Networks to deduce themes from the data. Support and involvement, mentoring, and career progression and retention were the three main themes identified upon analysis of the data. The majority of participants identified definitive career plans but some felt their goals were unachievable in their current workplace. Consequently a large number of participants have plans to leave their employment in neonates and pursue a career in other areas of nursing. Staff appraisals and succession planning programmes may assist early career nurses and midwives in focusing on their individual career goals, leading to a greater uptake of further specialised education and improved retention of neonatal nurses and midwives. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. 34 CFR 364.42 - What objectives and information must be included in the State plan?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What objectives and information must be included in the State plan? 364.42 Section 364.42 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION STATE...

  15. Tokamak Physics EXperiment (TPX): Toroidal field magnet design, development and manufacture. SDRL 15, System design description. Volume 1

    International Nuclear Information System (INIS)

    1995-01-01

    This System Design Description, prepared in accordance with the TPX Project Management Plan provides a summary or TF Magnet System design features at the conclusion of Phase I, Preliminary Design and Manufacturing Research. The document includes the analytical and experimental bases for the design, and plans for implementation in final design, manufacturing, test, and magnet integration into the tokamak. Requirements for operation and maintenance are outlined, and references to sources of additional information are provided

  16. Tokamak Physics EXperiment (TPX): Toroidal field magnet design, development and manufacture. SDRL 15, System design description. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-22

    This System Design Description, prepared in accordance with the TPX Project Management Plan provides a summary or TF Magnet System design features at the conclusion of Phase I, Preliminary Design and Manufacturing Research. The document includes the analytical and experimental bases for the design, and plans for implementation in final design, manufacturing, test, and magnet integration into the tokamak. Requirements for operation and maintenance are outlined, and references to sources of additional information are provided.

  17. Future land use plan

    International Nuclear Information System (INIS)

    1995-01-01

    The US Department of Energy's (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ''Future Land Use'' initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities' interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory's view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts

  18. Future land use plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-31

    The US Department of Energy`s (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ``Future Land Use`` initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities` interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory`s view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts.

  19. B Plant Complex pollution prevention plan. Revision 1

    International Nuclear Information System (INIS)

    Beam, T.G.

    1994-01-01

    The US Department of Energy (DOE) has directed Westinghouse Hanford Company (WHC) to develop an effective strategy to minimize the generation of hazardous, radioactive, and mixed wastes at Hanford in compliance with state and federal regulations. WHC has formalized a pollution prevention program composed of management policies, management requirements and procedures. This plan addresses pollution prevention for B Plant Complex. A pollution prevention team is in place and has been assigned responsibility for implementing the plan. This plan includes actions and goals for reducing volume and toxicity of waste generated, as well as a basis for evaluation of progress. Descriptions of waste streams, current specific goals, general pollution prevention methods, and specific accomplishments are in the appendices of this plan

  20. 49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.

    Science.gov (United States)

    2010-10-01

    ... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...

  1. PUREX facility preclosure work plan

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D)

  2. Including the public in pandemic planning: a deliberative approach

    Directory of Open Access Journals (Sweden)

    Braunack-Mayer Annette J

    2010-08-01

    Full Text Available Abstract Background Against a background of pandemic threat posed by SARS and avian H5N1 influenza, this study used deliberative forums to elucidate informed community perspectives on aspects of pandemic planning. Methods Two deliberative forums were carried out with members of the South Australian community. The forums were supported by a qualitative study with adults and youths, systematic reviews of the literature and the involvement of an extended group of academic experts and policy makers. The forum discussions were recorded with simultaneous transcription and analysed thematically. Results Participants allocated scarce resources of antiviral drugs and pandemic vaccine based on a desire to preserve society function in a time of crisis. Participants were divided on the acceptability of social distancing and quarantine measures. However, should such measures be adopted, they thought that reasonable financial, household and psychological support was essential. In addition, provided such support was present, the participants, in general, were willing to impose strict sanctions on those who violated quarantine and social distancing measures. Conclusions The recommendations from the forums suggest that the implementation of pandemic plans in a severe pandemic will be challenging, but not impossible. Implementation may be more successful if the public is engaged in pandemic planning before a pandemic, effective communication of key points is practiced before and during a pandemic and if judicious use is made of supportive measures to assist those in quarantine or affected by social isolation measures.

  3. National Waste Terminal Storage Program: configuration management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Purpose of the Configuration Management Plan is to provide the management discipline through which the integrity and continuity of program cost and schedule trade-off decisions which are made concerning the site selections and facilities performance, producibility, operability and supportability are recorded, communicated, and controlled by the Office of Waste Isolation

  4. Nexus: Planning Tomorrow, Today

    Science.gov (United States)

    Jaap, John; Meyer, Patrick

    2005-01-01

    To prepare for future human space flight programs, the Mission Operations Laboratory (MOL) at the Marshall Space Flight Center (MSFC) has been investigating new planning and scheduling paradigms. To support and prove this investigation, MOL technologists have developed a working prototype of a scheduling system to support the new paradigms. The new planning and scheduling system is called Nexus and has a web site at http://nexus.nasa.gov/. Nexus is based on a comprehensive modeling schema to capture all scheduling requirements typical to human space missions, an incremental scheduling engine tailored to the modeling schema, and remote access (including Personal Data Assistant (PDA) access) to the scheduling system. This paper describes the proposed paradigm shift and the enabling software. It also describes a typical Nexus demonstration which emphasizes how it works, how it enables the paradigm shift, and possible applications. Demonstrations include access to the full functionally of Nexus from a personal computer and access to limited functionally via a PDA. An appendix includes a description and screen shots of the demonstrations.

  5. New Brunswick Power Corporation: Business plan, 1994-1999

    International Nuclear Information System (INIS)

    1994-02-01

    The first publicly available business plan for the New Brunswick Power Corp. is presented. The five-year plan provides an overview of the Corporation's performance and directions, including possible future rate increases. A review of the corporate history of the utility is followed by a description of the strategic framework under which the Corporation conducts its business operations. The information presented includes customer requirements, power generation and transmission, system operations, personnel management, environmental protection, and external factors affecting operations. This overview demonstrates the complex issues facing the utility, the choices made in the past, and the matters that will have to be faced in the future. The business overview is followed by focused business plans in six key functional areas (facilities, operations, personnel, technology, environment, and finances) and comprehensive financial forecasts that outline a commitment to maintain competitive rates for customers. The reasoning behind the forecasts is explained and a glossary is included. 21 figs., 16 tabs

  6. The reference electricity expansion plan of Guatemala

    International Nuclear Information System (INIS)

    Santizo, Rodolfo

    2002-01-01

    This presentation prepared by the Deputy Minister of Energy and Mines overviews the following issues: description of electric power infrastructure, price markets, expansion plans, power and energy demand projections through 2010, including bussiness opportunities for private investment on geothermal and hidro electric power production and distribution market. This presentation is intended for private investors who could be interested in bussiness opportunities of energy generation market in Guatemala

  7. Description of surface systems. Preliminary site description. Forsmark area Version 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Lindborg, Tobias [ed.

    2005-06-01

    Swedish Nuclear Fuel and Waste Management Co (SKB) started site investigations for a deep repository for spent nuclear fuel in 2002 at two different sites in Sweden, Forsmark and Oskarshamn. The investigations should provide necessary information for a license application aimed at starting underground exploration. For this reason, ecosystem data need to be interpreted and assessed into site descriptive models, which in turn are used for safety assessment studies and for environmental impact assessment. Descriptions of the surface system are also needed for further planning of the site investigations. This report describes the surface ecosystems of the Forsmark site (e.g. hydrology, Quaternary deposits, chemistry, vegetation, animals and the human land use). The ecosystem description is an integration of the site and its regional setting, covering the current state of the biosphere as well as the ongoing natural processes affecting the longterm development. Improving the descriptions is important during both the initial and the complete site investigation phase. Before starting of the initial phase in Forsmark, version 0 of the site descriptive model was developed. The results of the initial site investigation phase is compiled into a preliminary site description of Forsmark (version 1.2) in June 2005. This report provides the major input and background to the biosphere description, in the 1.2 version of the Forsmark site description. The basis for this interim version is quality-assured field data from the Forsmark sub area and regional area, available in the SKB SICADA, and GIS data bases as of July 31th 2004 as well as version 1.1 of the Site Descriptive Model. To achieve an ecosystem site description there is a need to develop discipline-specific models by interpreting and analysing primary data. The different discipline-specific models are then integrated into a system describing interactions and flows and stocks of matter between and within functional units in

  8. Description of surface systems. Preliminary site description. Forsmark area Version 1.2

    International Nuclear Information System (INIS)

    Lindborg, Tobias

    2005-06-01

    Swedish Nuclear Fuel and Waste Management Co (SKB) started site investigations for a deep repository for spent nuclear fuel in 2002 at two different sites in Sweden, Forsmark and Oskarshamn. The investigations should provide necessary information for a license application aimed at starting underground exploration. For this reason, ecosystem data need to be interpreted and assessed into site descriptive models, which in turn are used for safety assessment studies and for environmental impact assessment. Descriptions of the surface system are also needed for further planning of the site investigations. This report describes the surface ecosystems of the Forsmark site (e.g. hydrology, Quaternary deposits, chemistry, vegetation, animals and the human land use). The ecosystem description is an integration of the site and its regional setting, covering the current state of the biosphere as well as the ongoing natural processes affecting the longterm development. Improving the descriptions is important during both the initial and the complete site investigation phase. Before starting of the initial phase in Forsmark, version 0 of the site descriptive model was developed. The results of the initial site investigation phase is compiled into a preliminary site description of Forsmark (version 1.2) in June 2005. This report provides the major input and background to the biosphere description, in the 1.2 version of the Forsmark site description. The basis for this interim version is quality-assured field data from the Forsmark sub area and regional area, available in the SKB SICADA, and GIS data bases as of July 31th 2004 as well as version 1.1 of the Site Descriptive Model. To achieve an ecosystem site description there is a need to develop discipline-specific models by interpreting and analysing primary data. The different discipline-specific models are then integrated into a system describing interactions and flows and stocks of matter between and within functional units in

  9. Hanford Site waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Place, B.G.

    1998-01-01

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site's pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office's (RL's) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program

  10. 49 CFR 172.202 - Description of hazardous material on shipping papers.

    Science.gov (United States)

    2010-10-01

    ... papers. 172.202 Section 172.202 Transportation Other Regulations Relating to Transportation PIPELINE AND... INFORMATION, TRAINING REQUIREMENTS, AND SECURITY PLANS Shipping Papers § 172.202 Description of hazardous material on shipping papers. (a) The shipping description of a hazardous material on the shipping paper...

  11. Requirements, guidance and logic in planning environmental investigations: Approval versus implementation

    International Nuclear Information System (INIS)

    Brice, D.A.; Meredith, D.V.; Harris, M.Q.

    1993-01-01

    In today's litigious society, it is important for both private parties and government to plan and conduct environmental investigations in a scientifically sound manner, documenting the purpose, methods, and results in a consistent fashion throughout the exercise. Planning documents are prepared during the initial phases of environmental investigations. Project objectives, including data quality requirements, specific work to be conducted to fulfill data needs, and operating procedures are specified. Regulatory agency approval of these documents is often required prior to plan implementation. These approvals are necessary and appropriate to fulfilling the agency's mandated role. Many guidance documents prepared by regulatory agencies suggest the content and format of various scoping documents. These guidances help standardize thought processes and considerations in planning, and provide a template to ensure that both the plan and the proposed work will fulfill regulatory requirements. This work describes the preparation and use of guidance documents for planning environmental studies. The goals and some of the pitfalls of such documents are discussed. Guidance should include the following elements: the purpose of the guidance and a description of where it applies; the type of items to be addressed in planning; identification of requirements are applicable to all projects for which the guidance is intended; identification of requirements only applicable in certain situations; a description of items to facilitate planning; a suggested format for fulfilling requirements; example applications of the guidance. Disagreements arise between planners and reviewers/approvers when elements of guidance are used as leverage to require work not directly related to project objectives. Guidance may be inappropriately used as a milestone by which site-specific plans are judged. Regulatory agency review and approval may be regarded as a primary objective of the plan

  12. Qualitative Descriptive Methods in Health Science Research.

    Science.gov (United States)

    Colorafi, Karen Jiggins; Evans, Bronwynne

    2016-07-01

    The purpose of this methodology paper is to describe an approach to qualitative design known as qualitative descriptive that is well suited to junior health sciences researchers because it can be used with a variety of theoretical approaches, sampling techniques, and data collection strategies. It is often difficult for junior qualitative researchers to pull together the tools and resources they need to embark on a high-quality qualitative research study and to manage the volumes of data they collect during qualitative studies. This paper seeks to pull together much needed resources and provide an overview of methods. A step-by-step guide to planning a qualitative descriptive study and analyzing the data is provided, utilizing exemplars from the authors' research. This paper presents steps to conducting a qualitative descriptive study under the following headings: describing the qualitative descriptive approach, designing a qualitative descriptive study, steps to data analysis, and ensuring rigor of findings. The qualitative descriptive approach results in a summary in everyday, factual language that facilitates understanding of a selected phenomenon across disciplines of health science researchers. © The Author(s) 2016.

  13. 'Only systems thinking can improve family planning program in Pakistan': A descriptive qualitative study.

    Science.gov (United States)

    Zafar, Saira; Shaikh, Babar Tasneem

    2014-12-01

    Family Planning (FP) program in Pakistan has been struggling to achieve the desired indicators. Despite a well-timed initiation of the program in late 50s, fertility decline has been sparingly slow. As a result, rapid population growth is impeding economic development in the country. A high population growth rate, the current fertility rate, a stagnant contraceptive prevalence rate and high unmet need remain challenging targets for population policies and FP programs. To accelerate the pace of FP programs and targets concerned, it is imperative to develop and adopt a holistic approach and strategy for plugging the gaps in various components of the health system: service delivery, information systems, drugs-supplies, technology and logistics, Human Resources (HRs), financing, and governance. Hence, World Health Organization (WHO) health systems building blocks present a practical framework for overall health system strengthening. This descriptive qualitative study, through 23 in-depth interviews, explored the factors related to the health system, and those responsible for a disappointing FP program in Pakistan. Provincial representatives from Population Welfare and Health departments, donor agencies and non-governmental organizations involved with FP programs were included in the study to document the perspective of all stakeholders. Content analysis was done manually to generate nodes, sub-nodes and themes. Performance of FP programs is not satisfactory as shown by the indicators, and these programs have not been able to deliver the desired outcomes. Interviewees agreed that inadequate prioritization given to the FP program by successive governments has led to this situation. There are issues with all health system areas, including governance, strategies, funding, financial management, service delivery systems, HRs, technology and logistic systems, and Management Information System (MIS); these have encumbered the pace of success of the program. All stakeholders

  14. NWTS waste package program plan. Volume I. Program strategy, description, and schedule

    International Nuclear Information System (INIS)

    1981-10-01

    This document describes the work planned for developing the technology to design, test and produce packages used for the long-term isolation of nuclear waste in deep geologic repositories. Waste forms considered include spent fuel and high-level waste. The testing and selection effort for barrier materials for radionuclide containment is described. The NWTS waste package program is a design-driven effort; waste package conceptual designs are used as input for preliminary designs, which are upgraded to a final design as materials and testing data become available. Performance assessment models are developed and validated. Milestones and a detailed schedule are given for the waste package development effort. Program logic networks defining work flow, interfaces among the NWTS Projects, and interrelationships of specific activities are presented. Detailed work elements are provided for the Waste Package Program Plan subtasks - design and development, waste form, barrier materials, and performance evaluation - for salt and basalt, host rocks for which the state of waste package knowledge and the corresponding data base are advanced

  15. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    International Nuclear Information System (INIS)

    Loll, C.M.

    1994-01-01

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures

  16. Surfaced-based investigations plan, Volume 4: Yucca Mountain Project

    International Nuclear Information System (INIS)

    1988-12-01

    This document represents a detailed summary of design plans for surface-based investigations to be conducted for site characterization of the Yucca Mountain site. These plans are current as of December 1988. The description of surface-based site characterization activities contained in this document is intended to give all interested parties an understanding of the current plans for site characterization of Yucca Mountain. The maps presented in Volume 4 are products of the Geographic Information System (GIS) being used by the Yucca Mountain Project. The ARC/INFO GIS software, developed by Environmental Systems Research Institute, was used to digitize and process these SBIP maps. The maps were prepared using existing US Geological Survey (USGS) maps as a planimetric base. Roads and other surface features were interpreted from a variety of sources and entered into the GIS. Sources include the USGS maps, 1976 USGS orthophotoquads and aerial photography, 1986 and 1987 aerial photography, surveyed coordinates of field sites, and a combination of various maps, figures, descriptions and approximate coordinates of proposed locations for future activities

  17. Summary description of the Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Cabell, C.P.

    1980-12-01

    This document has been compiled and issued to provide an illustrated engineering summary description of the FFTF. The document is limited to a description of the plant and its functions, and does not cover the extensive associated programs that have been carried out in the fields of design, design analysis, safety analysis, fuels development, equipment development and testing, quality assurance, equipment fabrication, plant construction, acceptance testing, operations planning and training, and the like

  18. Defining robustness protocols: a method to include and evaluate robustness in clinical plans

    International Nuclear Information System (INIS)

    McGowan, S E; Albertini, F; Lomax, A J; Thomas, S J

    2015-01-01

    We aim to define a site-specific robustness protocol to be used during the clinical plan evaluation process. Plan robustness of 16 skull base IMPT plans to systematic range and random set-up errors have been retrospectively and systematically analysed. This was determined by calculating the error-bar dose distribution (ebDD) for all the plans and by defining some metrics used to define protocols aiding the plan assessment. Additionally, an example of how to clinically use the defined robustness database is given whereby a plan with sub-optimal brainstem robustness was identified. The advantage of using different beam arrangements to improve the plan robustness was analysed. Using the ebDD it was found range errors had a smaller effect on dose distribution than the corresponding set-up error in a single fraction, and that organs at risk were most robust to the range errors, whereas the target was more robust to set-up errors. A database was created to aid planners in terms of plan robustness aims in these volumes. This resulted in the definition of site-specific robustness protocols. The use of robustness constraints allowed for the identification of a specific patient that may have benefited from a treatment of greater individuality. A new beam arrangement showed to be preferential when balancing conformality and robustness for this case. The ebDD and error-bar volume histogram proved effective in analysing plan robustness. The process of retrospective analysis could be used to establish site-specific robustness planning protocols in proton therapy. These protocols allow the planner to determine plans that, although delivering a dosimetrically adequate dose distribution, have resulted in sub-optimal robustness to these uncertainties. For these cases the use of different beam start conditions may improve the plan robustness to set-up and range uncertainties. (paper)

  19. Defining robustness protocols: a method to include and evaluate robustness in clinical plans

    Science.gov (United States)

    McGowan, S. E.; Albertini, F.; Thomas, S. J.; Lomax, A. J.

    2015-04-01

    We aim to define a site-specific robustness protocol to be used during the clinical plan evaluation process. Plan robustness of 16 skull base IMPT plans to systematic range and random set-up errors have been retrospectively and systematically analysed. This was determined by calculating the error-bar dose distribution (ebDD) for all the plans and by defining some metrics used to define protocols aiding the plan assessment. Additionally, an example of how to clinically use the defined robustness database is given whereby a plan with sub-optimal brainstem robustness was identified. The advantage of using different beam arrangements to improve the plan robustness was analysed. Using the ebDD it was found range errors had a smaller effect on dose distribution than the corresponding set-up error in a single fraction, and that organs at risk were most robust to the range errors, whereas the target was more robust to set-up errors. A database was created to aid planners in terms of plan robustness aims in these volumes. This resulted in the definition of site-specific robustness protocols. The use of robustness constraints allowed for the identification of a specific patient that may have benefited from a treatment of greater individuality. A new beam arrangement showed to be preferential when balancing conformality and robustness for this case. The ebDD and error-bar volume histogram proved effective in analysing plan robustness. The process of retrospective analysis could be used to establish site-specific robustness planning protocols in proton therapy. These protocols allow the planner to determine plans that, although delivering a dosimetrically adequate dose distribution, have resulted in sub-optimal robustness to these uncertainties. For these cases the use of different beam start conditions may improve the plan robustness to set-up and range uncertainties.

  20. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    International Nuclear Information System (INIS)

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan

  1. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  2. Waste Encapsulation and Storage Facility (WESF) Dangerous Waste Training Plan (DWTP)

    International Nuclear Information System (INIS)

    SIMMONS, F.M.

    2000-01-01

    This Waste Encapsulation Storage Facility (WESF) Dangerous Waste Training Plan (DWTP) applies to personnel who perform work at, or in support of WESF. The plan, along with the names of personnel, may be given to a regulatory agency inspector upon request. General workers, subcontractors, or visiting personnel who have not been trained in the management of dangerous wastes must be accompanied by an individual who meets the requirements of this training plan. Dangerous waste management includes handling, treatment, storage, and/or disposal of dangerous and/or mixed waste. Dangerous waste management units covered by this plan include: less-than-90-day accumulation area(s); pool cells 1-8 and 12 storage units; and process cells A-G storage units. This training plan describes general requirements, worker categories, and provides course descriptions for operation of the WESF permitted miscellaneous storage units and the Less-than-90-Day Accumulation Areas

  3. Hanford Site existing irradiated fuel storage facilities description

    Energy Technology Data Exchange (ETDEWEB)

    Willis, W.L.

    1995-01-11

    This document describes facilities at the Hanford Site which are currently storing spent nuclear fuels. The descriptions provide a basis for the no-action alternatives of ongoing and planned National Environmental Protection Act reviews.

  4. The NASA competitive placement plan for positions GS-15 and below (including trades and labor positions)

    Science.gov (United States)

    1993-01-01

    This plan provides the framework for selection based on merit from among the best qualified candidates available. Selections will be made without regard to political, religious, or labor organization affiliation or nonaffiliation, marital status, race, color, sex, national origin, nondisqualifying disability, or age. This plan does not guarantee promotion but rather ensures that all qualified available candidates receive fair and equitable consideration for positions filled under these competitive procedures. Announcing a vacancy under this plan is only one method of locating applicants for a position and can be used in conjunction with other methods. Subject to applicable law and regulation, selection of an individual to fill a position is the decision of management, as is the decision as to the method(s) to be used in identifying candidates. This plan is applicable to all NASA Installations. It covers all positions in the competitive service at (and below) the GS/GM-15 level (including all trades and labor positions), except positions in the Office of the Inspector General. The requirements herein are not intended to, nor should they be construed to limit in any way, the independent personnel authority of the Inspector General under the Inspector General Act, as Amended.

  5. Certification plan for safety and PRA codes

    International Nuclear Information System (INIS)

    Toffer, H.; Crowe, R.D.; Ades, M.J.

    1990-05-01

    A certification plan for computer codes used in Safety Analyses and Probabilistic Risk Assessment (PRA) for the operation of the Savannah River Site (SRS) reactors has been prepared. An action matrix, checklists, and a time schedule have been included in the plan. These items identify what is required to achieve certification of the codes. A list of Safety Analysis and Probabilistic Risk Assessment (SA ampersand PRA) computer codes covered by the certification plan has been assembled. A description of each of the codes was provided in Reference 4. The action matrix for the configuration control plan identifies code specific requirements that need to be met to achieve the certification plan's objectives. The checklist covers the specific procedures that are required to support the configuration control effort and supplement the software life cycle procedures based on QAP 20-1 (Reference 7). A qualification checklist for users establishes the minimum prerequisites and training for achieving levels of proficiency in using configuration controlled codes for critical parameter calculations

  6. Kilowatt isotope power system, Phase II Plan. Volume IV. Teledyne FSCD vs GDS

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-15

    This Volume contains Teledyne's input to the Kilowatt Isotope Power System Phase II Plan. Included is a description of the Flight System Heat Generation System, Flight System Radiator, Thermal Insulation Stability, GDS Heat Generation System and GDS Radiator.

  7. Long-term management plan INEL transuranic waste

    International Nuclear Information System (INIS)

    McKinney, J.D.

    1978-12-01

    The Idaho National Engineering Laboratory stores large quantities of transuranic-contaminated waste at its Radioactive Waste Management Complex. This report presents a 10-year plan for management of this transuranic waste and includes descriptions of projects involving nuclear waste storage, retrieval, processing, systems analysis, and environmental science. Detailed project schedules and work breakdown charts are provided to give the reader a clear view of transuranic waste management objectives

  8. Facility effluent monitoring plan for the 327 Facility

    International Nuclear Information System (INIS)

    1994-11-01

    The 327 Facility [Post-Irradiation Testing Laboratory] provides office and laboratory space for Pacific Northwest Laboratory (PNL) scientific and engineering staff conducting multidisciplinary research in the areas of post-irradiated fuels and structural materials. The facility is designed to accommodate the use of radioactive and hazardous materials in the conduct of these activities. This report summarizes the airborne emissions and liquid effluents and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements

  9. Planning at the University of Utrecht

    NARCIS (Netherlands)

    Noord, B.J.M van

    1980-01-01

    The Dutch Universities are at present confronted with a reduction of means and a still increasing number of students. In this situation the need for planning and planning instruments arises. This paper gives a brief description of the planning model now used within the University of Utrecht. This

  10. Research Planning Process

    Science.gov (United States)

    Lofton, Rodney

    2010-01-01

    This presentation describes the process used to collect, review, integrate, and assess research requirements desired to be a part of research and payload activities conducted on the ISS. The presentation provides a description of: where the requirements originate, to whom they are submitted, how they are integrated into a requirements plan, and how that integrated plan is formulated and approved. It is hoped that from completing the review of this presentation, one will get an understanding of the planning process that formulates payload requirements into an integrated plan used for specifying research activities to take place on the ISS.

  11. Treating Social Anxiety in Adolescents: Ten Group Therapy Lesson Plans

    Science.gov (United States)

    Mazur-Elmer, Alison; McBride, Dawn

    2009-01-01

    This project provides a comprehensive overview of the research literature on social anxiety disorder (SAD) in adolescents and concludes by offering a set of 10 group therapy lesson plans for SAD that therapists can use in their practice. The overview includes a description of social anxiety disorder and highlights various theories of anxiety. The…

  12. Annual plan, December 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This annual plan is being provided as required under Section 'D' of the Alberta Energy and Utilities Board Information Letter IL 90-8. The objective is to provide the Board, NOVA Gas Transmission (NGTL) customers and other interested parties with a comprehensive overview of NOVA Gas Transmission's pipeline system expansion plans for the gas year 2000/ 2001, and the winter season of the 2001/2002 gas year. The plan includes descriptions of NGTL's design assumptions and criteria, as well as long term outlook for field deliverability, productive capability, gas deliveries, proposed facility additions, capital expenditures, revenue requirements and firm service demand rates. Major factors affecting the facility requirements for the period under consideration are a decrease in the maximum day delivery volume at the Empress border point, an increase in intra-Alberta maximum day delivery volumes and associated decline in productive capability. Chapter One of the Plan describes the the Annual Plan process itself; Chapter Two is devoted to a discussion of facilities design methodology; Chapter Three deals with economic assumptions; Chapter Four describes design flow, while Chapters Five and Six outline the mainline , meter stations, laterals, and lateral loops facility requirements. Chapter Seven provides and overview of the capital and financial forecasts. tabs., figs.

  13. GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION.

    Energy Technology Data Exchange (ETDEWEB)

    PAQUETTE,D.E.; BENNETT,D.B.; DORSCH,W.R.; GOODE,G.A.; LEE,R.J.; KLAUS,K.; HOWE,R.F.; GEIGER,K.

    2002-05-31

    THE DEPARTMENT OF ENERGY ORDER 5400.1, GENERAL ENVIRONMENTAL PROTECTION PROGRAM, REQUIRES THE DEVELOPMENT AND IMPLEMENTATION OF A GROUNDWATER PROTECTION PROGRAM. THE BNL GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION PROVIDES AN OVERVIEW OF HOW THE LABORATORY ENSURES THAT PLANS FOR GROUNDWATER PROTECTION, MONITORING, AND RESTORATION ARE FULLY DEFINED, INTEGRATED, AND MANAGED IN A COST EFFECTIVE MANNER THAT IS CONSISTENT WITH FEDERAL, STATE, AND LOCAL REGULATIONS.

  14. New inverse planning technology for image-guided cervical cancer brachytherapy: Description and evaluation within a clinical frame

    International Nuclear Information System (INIS)

    Trnkova, Petra; Poetter, Richard; Baltas, Dimos; Karabis, Andreas; Fidarova, Elena; Dimopoulos, Johannes; Georg, Dietmar; Kirisits, Christian

    2009-01-01

    Purpose: To test the feasibility of a new inverse planning technology based on the Hybrid Inverse treatment Planning and Optimisation (HIPO) algorithm for image-guided cervical cancer brachytherapy in comparison to conventional manual optimisation as applied in recent clinical practice based on long-term intracavitary cervical cancer brachytherapy experience. Materials and methods: The clinically applied treatment plans of 10 tandem/ring (T/R) and 10 cases with additional needles (T/R + N) planned with PLATO v14.3 were included. Standard loading patterns were manually optimised to reach an optimal coverage with 7 Gy per fraction to the High Risk CTV and to fulfil dose constraints for organs at risk. For each of these patients an inverse plan was retrospectively created with Oncentra GYN v0.9.14. Anatomy based automatic source activation was based on the topography of target and organs. The HIPO algorithm included individual gradient and modification restrictions for the T/R and needle dwell times to preserve the spatial high-dose distribution as known from the long-term clinical experience in the standard cervical cancer brachytherapy and with manual planning. Results: HIPO could achieve a better target coverage (V100) for all T/R and 7 T/R + N patients. Changes in the shape of the overdose volume (V200/400) were limited. The D 2cc per fraction for bladder, rectum and sigmoid colon was on average lower by 0.2 Gy, 0.4 Gy, 0.2 Gy, respectively, for T/R patients and 0.6 Gy, 0.3 Gy, 0.3 Gy for T/R + N patients (a decrease from 4.5 to 4 Gy per fraction means a total dose reduction of 5 Gy EQD2 for a 4-fraction schedule). In general the dwell times in the additional needles were lower compared to manual planning. The sparing factors were always better for HIPO plans. Additionally, in 7 T/R and 7 T/R + N patients all three D 0.1cc , D 1cc and D 2cc for vagina wall were lower and a smaller area of vagina was covered by the reference dose in HIPO plans. Overall loading

  15. Planning for Planetary Science Mission Including Resource Prospecting, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Advances in computer-aided mission planning can enhance mission operations and science return for surface missions to Mars, the Moon, and beyond. While the...

  16. Experimental Test Plan DOE Tidal and River Reference Turbines

    Energy Technology Data Exchange (ETDEWEB)

    Neary, Vincent S [ORNL; Hill, Craig [St. Anthony Falls Laboratory, 2 Third Avenue SE, Minneapolis, MN 55414; Chamorro, Leonardo [St. Anthony Falls Laboratory, 2 Third Avenue SE, Minneapolis, MN 55414; Gunawan, Budi [ORNL

    2012-09-01

    Our aim is to provide details of the experimental test plan for scaled model studies in St. Anthony Falls Laboratory (SAFL) Main Channel at the University of Minnesota, including a review of study objectives, descriptions of the turbine models, the experimental set-up, instrumentation details, instrument measurement uncertainty, anticipated experimental test cases, post-processing methods, and data archiving for model developers.

  17. 48 CFR 1515.305-70 - Scoring plans.

    Science.gov (United States)

    2010-10-01

    ... METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 1515.305-70 Scoring plans. When... solicitation, e.g., other numeric, adjectival, color rating systems, etc. Scoring Plan Value Descriptive...

  18. Site Characterization Plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 3, Part A: Chapters 6 and 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 218 figs., 50 tabs.

  19. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 3, Part A: Chapters 6 and 7

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 218 figs., 50 tabs

  20. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 1, Part A: Chapters 1 and 2

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 750 refs., 123 figs., 42 tabs

  1. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 1, Part A: Chapters 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 750 refs., 123 figs., 42 tabs.

  2. HOW TO INCLUDE KEY COMPETENCES IN THE COURSE PLAN

    OpenAIRE

    Benito García Peinado

    2009-01-01

    In our school we have decided to develop the teaching approaches to key competences through an organizational model that could be called "the model of the educational basic training". When suggesting new planning, we think that we must offer some solutions which start from the classroom routines and help us to choose the best aspects of these methods to improve them.

  3. Operational radioactive waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1980-11-01

    The Operational Radioactive Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  4. A comparison of job descriptions for nurse practitioners working in out-of-hours primary care services: implications for workforce planning, patients and nursing.

    Science.gov (United States)

    Teare, Jean; Horne, Maria; Clements, Gill; Mohammed, Mohammed A

    2017-03-01

    To compare and contrast job descriptions for nursing roles in out-of-hours services to obtain a general understanding of what is required for a nurse working in this job. Out-of-hours services provide nursing services to patients either through telephone or face-to-face contact in care centres. Many of these services are newly created giving job opportunities to nurses working in this area. It is vital that nurses know what their role entails but also that patients and other professionals know how out-of-hours nurses function in terms of competence and clinical role. Content analysis of out-of-hours job descriptions. Content analysis of a convenience sample of 16 job descriptions of out-of-hours nurses from five out-of-hours care providers across England was undertaken. The findings were narratively synthesised, supported by tabulation. Key role descriptors were examined in terms of job titles, managerial skills, clinical skills, professional qualifications and previous experience. Content analysis of each out-of-hours job description revealed a lack of consensus in clinical competence and skills required related to job title although there were many similarities in skills across all the roles. This study highlights key differences and some similarities between roles and job titles in out-of-hours nursing but requires a larger study to inform workforce planning. Out-of-hours nursing is a developing area of practice which requires clarity to ensure patient safety and quality care. © 2016 John Wiley & Sons Ltd.

  5. Solid Waste Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  6. HOW TO INCLUDE KEY COMPETENCES IN THE COURSE PLAN

    Directory of Open Access Journals (Sweden)

    Benito García Peinado

    2009-04-01

    Full Text Available In our school we have decided to develop the teaching approaches to key competences through an organizational model that could be called "the model of the educational basic training". When suggesting new planning, we think that we must offer some solutions which start from the classroom routines and help us to choose the best aspects of these methods to improve them.

  7. Down the Road...Long Range Planning for Automation.

    Science.gov (United States)

    Texas State Library, Austin. Dept. of Library Development.

    The materials in this manual/workbook were prepared to assist participants in a workshop on long-range planning for library automation. Chapters cover the following topics: (1) "What Is Long-Range Planning?" (2) "Why Plan?" (3) "Who Needs to Participate?" (4) "Planning to Plan"; (5) "Determining Needs"; (6) "Description and Introduction"; (7)…

  8. ‘Only Systems Thinking Can Improve Family Planning Program in Pakistan’: A Descriptive Qualitative Study

    Directory of Open Access Journals (Sweden)

    Saira Zafar

    2014-12-01

    Full Text Available Background Family Planning (FP program in Pakistan has been struggling to achieve the desired indicators. Despite a well-timed initiation of the program in late 50s, fertility decline has been sparingly slow. As a result, rapid population growth is impeding economic development in the country. A high population growth rate, the current fertility rate, a stagnant contraceptive prevalence rate and high unmet need remain challenging targets for population policies and FP programs. To accelerate the pace of FP programs and targets concerned, it is imperative to develop and adopt a holistic approach and strategy for plugging the gaps in various components of the health system: service delivery, information systems, drugs-supplies, technology and logistics, Human Resources (HRs, financing, and governance. Hence, World Health Organization (WHO health systems building blocks present a practical framework for overall health system strengthening. Methods This descriptive qualitative study, through 23 in-depth interviews, explored the factors related to the health system, and those responsible for a disappointing FP program in Pakistan. Provincial representatives from Population Welfare and Health departments, donor agencies and non-governmental organizations involved with FP programs were included in the study to document the perspective of all stakeholders. Content analysis was done manually to generate nodes, sub-nodes and themes. Results Performance of FP programs is not satisfactory as shown by the indicators, and these programs have not been able to deliver the desired outcomes. Interviewees agreed that inadequate prioritization given to the FP program by successive governments has led to this situation. There are issues with all health system areas, including governance, strategies, funding, financial management, service delivery systems, HRs, technology and logistic systems, and Management Information System (MIS; these have encumbered the pace of

  9. Planning of cascade stations on the Maotiao He detailed

    Energy Technology Data Exchange (ETDEWEB)

    Guan, W

    1984-09-20

    Details of the hydroelectric power stations on the Maotiao He cascades and examples of how some problems were resolved begin with a description of the river basin survey for topographical features, hydrometeorological conditions, and geological conditions. The river characteristics survey was the basis for planning the cascade power stations and the selection of installed capacity at each station. The review also covers discharge and flood control planning based on rainfall data and the composition of flood areas. The overall development program emphasizes power generation, but also includes irrigation, industrial water supply, and tourism. 2 figures, 1 table.

  10. Savannah River Certification Plan for newly generated, contact-handled transuranic waste

    International Nuclear Information System (INIS)

    Wierzbicki, K.S.

    1986-01-01

    This Certification Plan document describes the necessary processes and methods for certifying unclassified, newly generated, contact-handled solid transuranic (TRU) waste at the Savannah River Plant and Laboratory (SRP, SRL) to comply with the Waste Isolation Pilot Plant Waste Acceptance Criteria (WIPP-WAC). Section 2 contains the organizational structure as related to waste certification including a summary of functional responsibilities, levels of authority, and lines of communication of the various organizations involved in certification activities. Section 3 describes general plant operations and TRU waste generation. Included is a description of the TRU Waste classification system. Section 4 contains the SR site TRU Waste Quality Assurance Program Plan. Section 5 describes waste container procurement, inspection, and certification prior to being loaded with TRU waste. Certification of waste packages, after package closure in the waste generating areas, is described in Section 6. The packaging and certification of individual waste forms is described in Attachments 1-5. Included in each attachment is a description of controls used to ensure that waste packages meet all applicable waste form compliance requirements for shipment to the WIPP. 3 figs., 3 tabs

  11. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 2, Part A: Chapters 3, 4, and 5

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1--5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 575 refs., 84 figs., 68 tabs

  12. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 2, Part A: Chapters 3, 4, and 5

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1--5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 575 refs., 84 figs., 68 tabs.

  13. Compact toroid development: activity plan for field reversed configurations

    International Nuclear Information System (INIS)

    1984-06-01

    This document contains the description, goals, status, plans, and approach for the investigation of the properties of a magnetic configuration for plasma confinement identified as the field reversed configuration (FRC). This component of the magnetic fusion development program has been characterized by its potential for physical compactness and a flexible range of output power. The included material represents the second phase of FRC program planning. The first was completed in February 1983, and was reported in DOE/ER-0160; Compact Toroid Development. This planning builds on that previous report and concentrates on the detailed plans for the next several years of the current DOE sponsored program. It has been deliberately restricted to the experimental and theoretical efforts possible within the present scale of effort. A third phase of this planning exercise will examine the subsequent effort and resources needed to achieve near term (1987 to 1990) FRC technical objectives

  14. 44 CFR 334.5 - GMR system description.

    Science.gov (United States)

    2010-10-01

    ... problems. (b) Stage 2, Crisis Management. During the crisis management stage, GMR plans are reviewed and... developed). For example, a Federal department or agency might divide “Crisis Management” into two, three, or... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false GMR system description. 334.5...

  15. AVLIS production plant waste management plan

    International Nuclear Information System (INIS)

    1984-01-01

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables

  16. Treatment planning optimization for linear accelerator radiosurgery

    International Nuclear Information System (INIS)

    Meeks, Sanford L.; Buatti, John M.; Bova, Francis J.; Friedman, William A.; Mendenhall, William M.

    1998-01-01

    Purpose: Linear accelerator radiosurgery uses multiple arcs delivered through circular collimators to produce a nominally spherical dose distribution. Production of dose distributions that conform to irregular lesions or conformally avoid critical neural structures requires a detailed understanding of the available treatment planning parameters. Methods and Materials: Treatment planning parameters that may be manipulated within a single isocenter to provide conformal avoidance and dose conformation to ellipsoidal lesions include differential arc weighting and gantry start/stop angles. More irregular lesions require the use of multiple isocenters. Iterative manipulation of treatment planning variables can be difficult and computationally expensive, especially if the effects of these manipulations are not well defined. Effects of treatment parameter manipulation are explained and illustrated. This is followed by description of the University of Florida Stereotactic Radiosurgery Treatment Planning Algorithm. This algorithm organizes the manipulations into a practical approach for radiosurgery treatment planning. Results: Iterative treatment planning parameters may be efficiently manipulated to achieve optimal treatment plans by following the University of Florida Treatment Planning Algorithm. The ability to produce conformal stereotactic treatment plans using the algorithm is demonstrated for a variety of clinical presentations. Conclusion: The standard dose distribution produced in linear accelerator radiosurgery is spherical, but manipulation of available treatment planning parameters may result in optimal dose conformation. The University of Florida Treatment Planning Algorithm organizes available treatment parameters to efficiently produce conformal radiosurgery treatment plans

  17. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  18. IMRT plan verification in radiotherapy

    International Nuclear Information System (INIS)

    Vlk, P.

    2006-01-01

    This article describes the procedure for verification of IMRT (Intensity modulated radiation therapy) plan, which is used in the Oncological Institute of St. Elisabeth in Bratislava. It contains basic description of IMRT technology and developing a deployment plan for IMRT planning system CORVUS 6.0, the device Mimic (Multilammelar intensity modulated collimator) and the overall process of verifying the schedule created. The aim of verification is particularly good control of the functions of MIMIC and evaluate the overall reliability of IMRT planning. (author)

  19. Optimality of profit-including prices under ideal planning.

    Science.gov (United States)

    Samuelson, P A

    1973-07-01

    Although prices calculated by a constant percentage markup on all costs (nonlabor as well as direct-labor) are usually admitted to be more realistic for a competitive capitalistic model, the view is often expressed that, for optimal planning purposes, the "values" model of Marx's Capital, Volume I, is to be preferred. It is shown here that an optimal-control model that maximizes discounted social utility of consumption per capita and that ultimately approaches a steady state must ultimately have optimal pricing that involves equal rates of steady-state profit in all industries; and such optimal pricing will necessarily deviate from Marx's model of equal rates of surplus value (markups on direct-labor only) in all industries.

  20. Descriptive statistics.

    Science.gov (United States)

    Nick, Todd G

    2007-01-01

    Statistics is defined by the Medical Subject Headings (MeSH) thesaurus as the science and art of collecting, summarizing, and analyzing data that are subject to random variation. The two broad categories of summarizing and analyzing data are referred to as descriptive and inferential statistics. This chapter considers the science and art of summarizing data where descriptive statistics and graphics are used to display data. In this chapter, we discuss the fundamentals of descriptive statistics, including describing qualitative and quantitative variables. For describing quantitative variables, measures of location and spread, for example the standard deviation, are presented along with graphical presentations. We also discuss distributions of statistics, for example the variance, as well as the use of transformations. The concepts in this chapter are useful for uncovering patterns within the data and for effectively presenting the results of a project.

  1. Strategic Planning for Institutions of Higher Education: A Content Analysis for the Universidad Tecnica del Estado Planning System.

    Science.gov (United States)

    Karadima, Oscar

    Ten-year development plans of each of the eight campuses of the Universidad de Santiago de Chile, formerly called Universidad Tecnica del Estado, are evaluated, using content analysis. In addition to narrative descriptions, diagrams illustrate the features of each plan, which covers the period 1983-1993. Topics covered by the plans were grouped…

  2. Studies in Family Planning, Number 38. Beyond Family Planning.

    Science.gov (United States)

    Berelson, Bernard

    This paper, published by The Population Council, reviews 29 proposals dealing with population controls beyond the current efforts of national programs of voluntary family planning. The proposals are subsumed under eight descriptive categories which are: (1) Extensions of voluntary fertility control; (2) Establishment of involuntary fertility…

  3. Operational radioactive defense waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1981-07-01

    The Operational Radioactive Defense Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  4. Development of Consistency between Marketing and Planning.

    Science.gov (United States)

    Williford, A. Michael

    1986-01-01

    Examined descriptive information about marketing, enrollment management, institutional planning and factors affecting them. A factor analysis of statistically appropriate variables identified factors associated with a state of symbiosis between marketing and institutional planning. (Author/BL)

  5. Including the Consumer and Environment in Occupational Therapy Treatment Planning.

    Science.gov (United States)

    Brown, Catana; Bowen, Robin E.

    1998-01-01

    Occupational therapists (n=29) completed treatment plans based on case study data. Analysis indicated they often identified goals not addressed by the consumer/client. They significantly selected more simulated than real activities and more activities designed to change the person rather than the environment. (SK)

  6. 29 CFR 778.214 - Benefit plans; including profit-sharing plans or trusts providing similar benefits.

    Science.gov (United States)

    2010-07-01

    ... fide plan for providing old age, retirement, life, accident, or health insurance or similar benefits... employee on account of severance of employment (or for any other reason) would not result in any increase... mechanics performing contract work subject to the Davis-Bacon Act and related statutes, the provisions of...

  7. DESCRIPTION OF THE TRITIUM-PRODUCING BURNABLE ABSORBER ROD FOR THE COMMERCIAL LIGHT WATER REACTOR TTQP-1-015 Rev 19

    Energy Technology Data Exchange (ETDEWEB)

    Burns, Kimberly A.; Love, Edward F.; Thornhill, Cheryl K.

    2012-02-01

    Tritium-producing burnable absorber rods (TPBARs) used in the U.S. Department of Energy’s Tritium Readiness Program are designed to produce tritium when placed in a Westinghouse or Framatome 17x17 fuel assembly and irradiated in a pressurized water reactor (PWR). This document provides an unclassified description of the current design baseline for the TPBARs. This design baseline is currently valid only for Watts Bar reactor production cores. A description of the Lead Use TPBARs will not be covered in the text of the document, but the applicable drawings, specifications and test plan will be included in the appropriate appendices.

  8. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  9. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  10. Control of hydrogen sulfide emission from geothermal power plants. Volume III. Final report: demonstration plant equipment descriptions, test plan, and operating instructions

    Energy Technology Data Exchange (ETDEWEB)

    Brown, F.C.; Harvey, W.W.; Warren, R.B.

    1977-01-01

    The elements of the final, detailed design of the demonstration plant for the copper sulfate process for the removal of hydrogen sulfide from geothermal steam are summarized. Descriptions are given of all items of equipment in sufficient detail that they can serve as purchase specifications. The process and mechanical design criteria which were used to develop the specifications, and the process descriptions and material and energy balance bases to which the design criteria were applied are included. (MHR)

  11. 30 CFR 784.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 784.11... PLAN § 784.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  12. 30 CFR 780.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 780.11... PLAN § 780.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  13. A case-based approach to understanding vacation planning

    Science.gov (United States)

    Susan I. Stewart; Christine A. Vogt

    1999-01-01

    Vacations provide an opportunity to make many choices, and even for travelers who want their vacations to be spontaneous, planning is often an important part of vacationing. Although descriptive studies of travel planning have sketched out the elements of the vacation plan, these elements have not been drawn together in a conceptual model of the consumer planning...

  14. Self-management interventions including action plans for exacerbations versus usual care in patients with chronic obstructive pulmonary disease.

    Science.gov (United States)

    Lenferink, Anke; Brusse-Keizer, Marjolein; van der Valk, Paul Dlpm; Frith, Peter A; Zwerink, Marlies; Monninkhof, Evelyn M; van der Palen, Job; Effing, Tanja W

    2017-08-04

    Chronic Obstructive Pulmonary Disease (COPD) self-management interventions should be structured but personalised and often multi-component, with goals of motivating, engaging and supporting the patients to positively adapt their behaviour(s) and develop skills to better manage disease. Exacerbation action plans are considered to be a key component of COPD self-management interventions. Studies assessing these interventions show contradictory results. In this Cochrane Review, we compared the effectiveness of COPD self-management interventions that include action plans for acute exacerbations of COPD (AECOPD) with usual care. To evaluate the efficacy of COPD-specific self-management interventions that include an action plan for exacerbations of COPD compared with usual care in terms of health-related quality of life, respiratory-related hospital admissions and other health outcomes. We searched the Cochrane Airways Group Specialised Register of trials, trials registries, and the reference lists of included studies to May 2016. We included randomised controlled trials evaluating a self-management intervention for people with COPD published since 1995. To be eligible for inclusion, the self-management intervention included a written action plan for AECOPD and an iterative process between participant and healthcare provider(s) in which feedback was provided. We excluded disease management programmes classified as pulmonary rehabilitation or exercise classes offered in a hospital, at a rehabilitation centre, or in a community-based setting to avoid overlap with pulmonary rehabilitation as much as possible. Two review authors independently assessed trial quality and extracted data. We resolved disagreements by reaching consensus or by involving a third review author. Study authors were contacted to obtain additional information and missing outcome data where possible. When appropriate, study results were pooled using a random-effects modelling meta-analysis. The primary

  15. System design description for sampling fuel in K basins

    International Nuclear Information System (INIS)

    Baker, R.B.

    1996-01-01

    This System Design Description provides: (1) statements of the Spent Nuclear Fuel Projects (SNFP) needs requiring sampling of fuel in the K East and K West Basins, (2) the sampling equipment functions and requirements, (3) a general work plan and the design logic being followed to develop the equipment, and (4) a summary description of the design for the sampling equipment. The report summarizes the integrated application of both the subject equipment and the canister sludge sampler in near-term characterization campaigns at K Basins

  16. FTA multi-year research program plan (FY 2009 - FY 2013).

    Science.gov (United States)

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  17. Georgetown University generic integrated community energy system GU-ICES demonstration project. Modified work management plan. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-04-01

    This Phase II Modified Work Management Plan reflects the change from a Coal Using ICES to a Generic ICES Program. As such, it retains the essential elements relating to coal while broadening the number and types of alternative energy subsystems to be evaluated for eventual implementation on the Georgetown University Campus. In addition to the plan in Book I, Book II deals with an energy audit conducted at the campus in the fall of 1978 to establish a gross baseline from which to measure and evaluate the contributions of selected alternative energy subsystems both from an energy and cost standpoint. Book I proceeds from a discussion of an ICES through an explanation of the scope of effort in each phase expanded into detailed task descriptions by phase together with schedules, PERT and GANTT charts, milestones and levels of effort by task for the Feasibility Analysis, and schedules for the overall program. A description of examples of alternative subsystems to be considered is also included. A detailed Management Plan for the conduct of the effort by General Electric completes the plan. Appendices related to cogeneration, life-cycle costing, GE energy subsystems, the GU Master Energy Plan, and typical regulatory processes to be encountered are included. Book II treats the Energy Audit under the three committed task areas of System Description, Analysis and Survey, and Criteria for Energy Usage. The five major energy systems utilized at Georgetown are considered: electrical, chilled water, steam, gas and fuel oil, and city water. A top level analysis yields significant results and recommendations for further action with respect to a detailed measurements program, particularly of steam and electric power usage, over a one year period.

  18. Integrated management plan for the North Sea and Skagerrak: Status description for the petroleum industry with emphasis on the Norwegian continental shelf; Helhetlig forvaltningsplan for Nordsjoeen og Skagerrak: Statusbeskrivelse for petroleumsvirksomheten med hovedvekt paa norsk sokkel

    Energy Technology Data Exchange (ETDEWEB)

    2010-06-15

    Status description of the petroleum industry covers mainly the Norwegian continental shelf, but it is also given a brief description of the activity in other offshore areas of the North Sea. It shows a list of producing fields, fields under development, developments in the future, findings that are in the planning phase, and completed fields. It also describes the pipelines and other petroleum-related activities at sea and on shore. (AG)

  19. Corporate plan 1989

    International Nuclear Information System (INIS)

    1988-12-01

    The paper presents the United Kingdom Science and Engineering Research Council's second Corporate Plan 1989. The Corporate Plan comprises statements of the current objectives of the Astronomy and Planetary Science Board, the Engineering Board, the Nuclear Physics Board, the Atmospheric Sciences and Computing Centre, along with a discussion of the mechanisms for their attainment. The Annex contains a description of some scientific highlights between 1985-1989, as well as a review of progress between 1984-5 to 1987-8. (U.K.)

  20. Olkiluoto site description 2006

    International Nuclear Information System (INIS)

    Andersson, J.; Ahokas, H.; Hudson, J.A.

    2007-03-01

    subjective criteria are used for identifying faults; Regarding the rock mechanics description, presented in Chapter 5, additional data have been assessed and the overall level of rock mechanics understanding has increased compared with previous model versions; A new hydrogeological model has been developed, which is presented in Chapter 6, which places more emphasis on the hydraulic data. Pressure anomalies are now stronger drivers for including hydraulic zones in the model and the number of explicit uncertain cases is greater; The hydrogeochemical description, presented in Chapter 7, is consistent with the previous model and there is an increased level of internal consistency in the hydrogeochemical understanding. Information on gases and understanding of their origin has increased significantly. Based on these descriptions, the report also makes a second set of predictions in Chapter 9 concerning the expected geology and rock mechanics properties to be found during the excavation of the ONKALO and also predicts the hydrogeological and hydrogeochemical impacts of these excavations. Two types of predictions are made: type A predictions, that use only the latest version of the overall Site Model; and type B predictions, that also use all the data from the tunnel, which are derived from activities, such as tunnel mapping and Pilot holes. The Site Descriptive Modelling involves uncertainties and it is necessary to assess the confidence in such modelling. This has been assessed through special protocols in a technical auditing exercise, which is presented in Chapter 10. These protocols investigate whether all data have been considered and understood; where the uncertainties lie and what the potential is for alternative interpretations; whether there is sufficient consistency between disciplines and consistency with the past evolution of the site; as well as comparisons with previous model versions. Chapter 11 concludes that, overall, the uncertainty and confidence assessment

  1. Quality assurance program description: Hanford Waste Vitrification Plant, Part 1

    International Nuclear Information System (INIS)

    1992-01-01

    This document describes the Department of Energy's Richland Field Office (DOE-RL) quality assurance (QA) program for the processing of high-level waste as well as the Vitrification Project Quality Assurance Program for the design and construction of the Hanford Waste Vitrification Plant (HWVP). It also identifies and describes the planned activities that constitute the required quality assurance program for the HWVP. This program applies to the broad scope of quality-affecting activities associated with the overall HWVP Facility. Quality-affecting activities include designing, purchasing, fabricating, handling, shipping, storing, cleaning, erecting, installing, inspecting, testing, maintaining, repairing, and modifying. Also included are the development, qualification, and production of waste forms which may be safely used to dispose of high-level radioactive waste resulting from national defense activities. The HWVP QA program is made up of many constituent programs that are being implemented by the participating organizations. This Quality Assurance program description is intended to outline and define the scope and application of the major programs that make up the HWVP QA program. It provides a means by which the overall program can be managed and directed to achieve its objectives. Subsequent parts of this description will identify the program's objectives, its scope, application, and structure

  2. 7 CFR 249.4 - State Plan.

    Science.gov (United States)

    2010-01-01

    ... State Plan or amendment within 30 days of receipt. Portions of the State Plan that do not change... organizations for services such as certification of eligible participants, issuance of SFMNP coupons or benefits... provided. (14) A detailed description of the State agency's system for managing its coupon, market, and CSA...

  3. [Materiality Analysis of Health Plans Based on Stakeholder Engagement and the Issues Included at ISO 26000:2010].

    Science.gov (United States)

    Moyano Santiago, Miguel Angel; Rivera Lirio, Juana María

    2017-01-18

    Health plans of the Spanish autonomous communities can incorporate sustainable development criteria in its development. There have been no analysis or proposals about development and indicators. The goal is to add a contribution to help build better health plans aimed at sustainable development and help to manage economic, social and environmental impacts of health systems criteria. We used a variation of the RAND/UCLA or modified Delphi technique method. The process consisted of a bibliographical and context matters and issues related to health and social responsibility analysis based on ISO 26000: 2010. A survey by deliberately to a selection of 70 expert members of the identified stakeholders was carried out and a discussion group was held to determine the consensus on the issues addressed in the survey sample. The research was conducted in 2015. From the literature review 33 health issues included in ISO 26000:2010 were obtained. 7 survey proved relevant high consensus, 8 relevance and average consensus and 18 with less relevance and high level of dissent. The expert group excluded 4 of the 18 subjects with less consensus. 29 issues included 33 at work, divided into 7 subjects contained in the guide ISO 26000 of social responsibility, were relevant stakeholders regarding possible inclusion in health plans. Considering the direct relationship published by ISO (International Organization for Standardization) among the issues ISO 26000 and the economic, social and environmental indicators in GRI (Global Reporting Initiative) in its G4 version, a panel with monitoring indicators related to relevant issues were elaborated.

  4. 29 CFR 2520.102-2 - Style and format of summary plan description.

    Science.gov (United States)

    2010-07-01

    ... than the style, captions, printing type, and prominence used to describe or summarize plan benefits. The advantages and disadvantages of the plan shall be presented without either exaggerating the... materials, but shall be given in the non-English language common to these participants and shall be...

  5. 'Not yet' and 'Just ask': barriers and facilitators to advance care planning--a qualitative descriptive study of the perspectives of seriously ill, older patients and their families.

    Science.gov (United States)

    Simon, Jessica; Porterfield, Pat; Bouchal, Shelley Raffin; Heyland, Daren

    2015-03-01

    To explore seriously ill, older hospitalised patients' and their family members' perspectives on the barriers and facilitators of advance care planning (ACP). We used qualitative descriptive study methodology to analyse data from an interviewer administered, questionnaire-based, Canadian multicentre, prospective study of this population. Three main categories described these barriers and facilitators: (1) person (beliefs, attitudes, experiences, health status), (2) access (to doctors and healthcare providers, information, tools and infrastructure to communicate ACP preferences) and (3) the interaction with the doctor (who and how initiated, location, timing, quality of communication, relationship with doctor). Based on the findings, we suggest strategies for both healthcare systems and individual healthcare providers to improve the quality and quantity of ACP with this population. These include assessing readiness for participation in ACP and personalising relevance of ACP to each individual, routinely offering scheduled family meetings for exploring a person's own goals and sharing information, ensuring systems and policies are in place to access previous ACP documentation and ensuring doctors' education includes ACP communication skills. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  6. THE SHEFFIELD ALCOHOL POLICY MODEL - A MATHEMATICAL DESCRIPTION.

    Science.gov (United States)

    Brennan, Alan; Meier, Petra; Purshouse, Robin; Rafia, Rachid; Meng, Yang; Hill-Macmanus, Daniel; Angus, Colin; Holmes, John

    2014-09-30

    This methodology paper sets out a mathematical description of the Sheffield Alcohol Policy Model version 2.0, a model to evaluate public health strategies for alcohol harm reduction in the UK. Policies that can be appraised include a minimum price per unit of alcohol, restrictions on price discounting, and broader public health measures. The model estimates the impact on consumers, health services, crime, employers, retailers and government tax revenues. The synthesis of public and commercial data sources to inform the model structure is described. A detailed algebraic description of the model is provided. This involves quantifying baseline levels of alcohol purchasing and consumption by age and gender subgroups, estimating the impact of policies on consumption, for example, using evidence on price elasticities of demand for alcohol, quantification of risk functions relating alcohol consumption to harms including 47 health conditions, crimes, absenteeism and unemployment, and finally monetary valuation of the consequences. The results framework, shown for a minimum price per unit of alcohol, has been used to provide policy appraisals for the UK government policy-makers. In discussion and online appendix, we explore issues around valuation and scope, limitations of evidence/data, how the framework can be adapted to other countries and decisions, and ongoing plans for further development. © 2014 The Authors. Health Economics published by John Wiley & Sons Ltd. © 2014 The Authors. Health Economics published by John Wiley & Sons Ltd.

  7. Precision IORT - Image guided intraoperative radiation therapy (igIORT) using online treatment planning including tissue heterogeneity correction.

    Science.gov (United States)

    Schneider, Frank; Bludau, Frederic; Clausen, Sven; Fleckenstein, Jens; Obertacke, Udo; Wenz, Frederik

    2017-05-01

    To the present date, IORT has been eye and hand guided without treatment planning and tissue heterogeneity correction. This limits the precision of the application and the precise documentation of the location and the deposited dose in the tissue. Here we present a set-up where we use image guidance by intraoperative cone beam computed tomography (CBCT) for precise online Monte Carlo treatment planning including tissue heterogeneity correction. An IORT was performed during balloon kyphoplasty using a dedicated Needle Applicator. An intraoperative CBCT was registered with a pre-op CT. Treatment planning was performed in Radiance using a hybrid Monte Carlo algorithm simulating dose in homogeneous (MCwater) and heterogeneous medium (MChet). Dose distributions on CBCT and pre-op CT were compared with each other. Spinal cord and the metastasis doses were evaluated. The MCwater calculations showed a spherical dose distribution as expected. The minimum target dose for the MChet simulations on pre-op CT was increased by 40% while the maximum spinal cord dose was decreased by 35%. Due to the artefacts on the CBCT the comparison between MChet simulations on CBCT and pre-op CT showed differences up to 50% in dose. igIORT and online treatment planning improves the accuracy of IORT. However, the current set-up is limited by CT artefacts. Fusing an intraoperative CBCT with a pre-op CT allows the combination of an accurate dose calculation with the knowledge of the correct source/applicator position. This method can be also used for pre-operative treatment planning followed by image guided surgery. Copyright © 2017 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  8. Office of Inspector General fiscal year 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  9. Coordinated CSN-UNESA research plan (PCI)

    International Nuclear Information System (INIS)

    Incinillas, J.

    2001-01-01

    This article contains a description of the essence and current status of the Coordinated Research Plan (PCI), beginning with details on the general specifications of the Framework Agreement signed by CSN and UNESA in September 1997, with an initial duration of four years and extendable on a yearly basis. The section on PCI Management describes the governing bodies, the mechanisms for including a project, tracking of projects underway, and the mechanisms for concluding projects. The Plan's generic goals are to acquire and increase technological skills and tools to guarantee operation of the nuclear park, take advantage of the synergies of the plants as a whole, and optimize the regulatory framework from the standpoint of safety and efficiency. In addition, strategic targets concerning efficiency, technological development and environment are defined. The current project status, overall budget and project completed to data are described. (Author)

  10. International Summit Consensus Statement: Intellectual Disability Inclusion in National Dementia Plans.

    Science.gov (United States)

    Watchman, Karen; Janicki, Matthew P; Splaine, Michael; Larsen, Frode K; Gomiero, Tiziano; Lucchino, Ronald

    2017-06-01

    The World Health Organization (WHO) has called for the development and adoption of national plans or strategies to guide public policy and set goals for services, supports, and research related to dementia. It called for distinct populations to be included within national plans, including adults with intellectual disability (ID). Inclusion of this group is important as having Down's syndrome is a significant risk factor for early-onset dementia. Adults with other ID may have specific needs for dementia-related care that, if unmet, can lead to diminished quality of old age. An International Summit on Intellectual Disability and Dementia, held in Scotland, reviewed the inclusion of ID in national plans and recommended that inclusion goes beyond just description and relevance of ID. Reviews of national plans and reports on dementia show minimal consideration of ID and the challenges that carers face. The Summit recommended that persons with ID, as well as family carers, should be included in consultation processes, and greater advocacy is required from national organizations on behalf of families, with need for an infrastructure in health and social care that supports quality care for dementia.

  11. Decommissioning planning and the assessment of alternatives for the Hanford production reactors

    International Nuclear Information System (INIS)

    Miller, C.E. Jr.; Potter, R.F.

    1985-01-01

    Several years ago, the US Department of Energy began assessing alternatives and planning the decommissioning of eight shut-down plutonium production reactors located on the DOE Hanford Site in Washington State. The first of these graphite-moderated, water-cooled, reactors was built and started up in 1944 as part of the World War II Manhattan Project. The last of them started up in 1955. The eight reactors each operated for 12 to 24 years, with all eight operating simultaneously for about 10 years. In the 1960's, production needs declined and the reactors were one-by-one permanently shut down, the last of them in 1971. (A ninth Hanford production reactor, N Reactor, was started up in 1963; it is still operating and is not within the scope of the decommissioning planning and alternatives assessment work reported in this paper). This paper provides an overview description of the decommissioning plan for the eight shut-down Hanford production reactors and their associated fuel storage basins. Included are descriptions of the decommissioning alternatives considered for the facilities, along with discussions of National Environmental Policy Act (NEPA) process activities applicable to the Hanford decommissioning work. The criteria used in assessing decommissioning alternatives and the assumptions used in the decommissioning planning are identified. 4 refs., 8 figs., 3 tabs

  12. Clean Coal Technology: Region 4 Market Description, South Atlantic

    International Nuclear Information System (INIS)

    1993-09-01

    The Region 4 Market Description Summary provides information that can be used in developing an understanding of the potential markets for clean coal technologies (CCTs) in the South Atlantic Region. This region (which geographically is Federal Region 4) consists of the following eight states: Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina, and Tennessee. In order to understand the potential market. A description is provided of the region's energy use, power generation capacity, and potential growth. Highlights of state government activities that could have a bearing on commercial deployment of CCTs are also presented. The potential markets characterized in this summary center on electric power generation by investor-owned, cooperative, and municipal electric utilities and involve planned new capacity additions and actions taken by utilities to comply with Phases I and II of the Clean Air Act Amendments (CAAA) of 1990. Regulations, policies, utility business strategies, and organizational changes that could impact the role of CCTs as a utility option are identified and discussed. The information used to develop the Region 4 Market Description is based mainly on an extensive review of plans and annual reports of 29 investor-owned, cooperative, and municipal coal-using electric utilities and public information on strategies and actions for complying with the CAAA of 1990

  13. Implementation of three dimensional treatment planning system for external radiotherapy

    International Nuclear Information System (INIS)

    Major, Tibor; Kurup, P.G.G.; Stumpf, Janos

    1997-01-01

    A three dimensional (3D) treatment planning system was installed at Apollo Cancer Hospital, Chennai, India in 1995. This paper gives a short description of the system including hardware components, calculation algorithm, measured data requirements and specific three dimensional features. The concept and the structure of the system are shortly described. The first impressions along with critical opinions and the experiences are gained during the data acquisition are mentioned. Some improvements in the user interface are suggested. It is emphasized that although a 3D system offers more detailed and accurate dose distributions compared to a 2D system, it also introduces a greatly increased workload for the planning staff. (author)

  14. An Integrated Extravehicular Activity Research Plan

    Science.gov (United States)

    Abercromby, Andrew F. J.; Ross, Amy J.; Cupples, J. Scott

    2016-01-01

    Multiple organizations within NASA and outside of NASA fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Research Plan will be conducted annually. External peer review of all HRP EVA research activities including compilation and review of published literature in the EVA Evidence Book is already performed annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the current Integrated EVA Research Plan are presented including description of ongoing and planned research activities in the areas of: Benchmarking; Anthropometry and Suit Fit; Sensors; Human

  15. 29 CFR 1956.50 - Description of the plan as certified.

    Science.gov (United States)

    2010-07-01

    ... means as a State poster and required posting of notices of violations. The plan also provides for... filing a petition with the Department of Labor, or later if good cause for late filing is shown. If the...

  16. Tool for Military Logistics Planning of Peace Support Operations: The OTAS Planning Tool

    NARCIS (Netherlands)

    Merrienboer, S.A. van

    1998-01-01

    Within the research group Operations Research Studies Army of the TNO Physics and Electronics Laboratory the OTAS planning tool is developed for the Royal Netherlands Armed Forces. This paper gives a general and brief description of the tool.

  17. Operation REDWING Commander Task Group 7.3, Operation Plan Number 1-56.

    Science.gov (United States)

    1956-01-24

    Radio Circuit Description SI. Tab B - Radio Frequency Plan 7:: Tab C - Aircraft Radio Frequency List Tab D - Radio Circuit Diagram Appendix 2 - Radio...Frequency Plan C Aircraft Radio Frequency List D Radio Circuit Diagrams 2 - Radio Call Signs and Code ’Words N. ROHI5BE2 E LCDR, U. S. Navy Flag...appendix. TABS: A Radio Circuit Description B Radio Frequency Plan C Aircraft Radio Frequency List D Radio Circuit Diagrams Joint Task Force SEVEN Task

  18. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 5, Part B: Chapter 8, Sections 8.3.1.5 through 8.3.1.17

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the SOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules.

  19. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 5, Part B: Chapter 8, Sections 8.3.1.5 through 8.3.1.17

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the SOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules

  20. 50 CFR 15.32 - Criteria for including species in the approved list for non-captive-bred species.

    Science.gov (United States)

    2010-10-01

    ... Management and Scientific Authorities transmitting the management plan of this species; (iii) A summary of... where the species forages (aerial feeder, tree canopy, tree trunk, midstory, understory, open water or..., disease carrier; a description of the damage the pest species causes to its ecosystem; and a description...

  1. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  2. Stakeholder perceptions of a total market approach to family planning in Nicaragua.

    Science.gov (United States)

    Drake, Jennifer Kidwell; Espinoza, Henry; Suraratdecha, Chutima; Lacayo, Yann; Keith, Bonnie M; Vail, Janet G

    2011-05-01

    To assess private-sector stakeholders' and donors' perceptions of a total market approach (TMA) to family planning in Nicaragua in the context of decreased funding; to build evidence for potential strategies and mechanisms for TMA implementation (including public-private partnerships (PPPs)); and to identify information gaps and future priorities for related research and advocacy. A descriptive exploratory study was conducted in various locations in Nicaragua from March to April 2010. A total of 24 key private-sector stakeholders and donors were interviewed and their responses analyzed using two questionnaires and a stakeholder analysis tool (PolicyMakerTM software). All survey participants supported a TMA, and public-private collaboration, in family planning in Nicaragua. Based on the survey responses, opportunities for further developing PPPs for family planning include building on and expanding existing governmental frameworks, such as Nicaragua's current coordination mechanism for contraceptive security. Obstacles include the lack of ongoing government engagement with the commercial (for-profit) sector and confusion about regulations for its involvement in family planning. Strategies for strengthening existing PPPs include establishing a coordination mechanism specifically for the commercial sector and collecting and disseminating evidence supporting public-private collaboration in family planning. There was no formal or absolute opposition to a TMA or PPPs in family planning in Nicaragua among a group of diverse nongovernmental stakeholders and donors. This type of study can help identify strategies to mobilize existing and potential advocates in achieving articulated policy goals, including diversification of funding sources for family planning to achieve contraceptive security.

  3. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 4, Part B: Chapter 8, Sections 8.0 through 8.3.1.4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 74 figs., 32 tabs.

  4. Gul'ko, descriptive, and Gruenhage compact spaces

    Czech Academy of Sciences Publication Activity Database

    Fabian, Marián; Montesinos, V.; Zizler, Václav

    2010-01-01

    Roč. 104, č. 2 (2010), s. 201-220 ISSN 1578-7303 R&D Projects: GA AV ČR IAA100190901; GA AV ČR(CZ) IAA100190610 Institutional research plan: CEZ:AV0Z10190503 Keywords : Gul'ko * descriptive * fragmentable compact spaces * network Subject RIV: BA - General Mathematics Impact factor: 0.400, year: 2010 http://link.springer.com/article/10.5052%2FRACSAM.2010.14

  5. Thin film description by wavelet coefficients statistics

    Czech Academy of Sciences Publication Activity Database

    Boldyš, Jiří; Hrach, R.

    2005-01-01

    Roč. 55, č. 1 (2005), s. 55-64 ISSN 0011-4626 Grant - others:GA UK(CZ) 173/2003 Institutional research plan: CEZ:AV0Z10750506 Keywords : thin films * wavelet transform * descriptors * histogram model Subject RIV: BD - Theory of Information Impact factor: 0.360, year: 2005 http://library.utia.cas.cz/separaty/2009/ZOI/boldys-thin film description by wavelet coefficients statistics .pdf

  6. Draft Strategic Laboratory Missions Plan. Volume II

    International Nuclear Information System (INIS)

    1996-03-01

    This volume described in detail the Department's research and technology development activities and their funding at the Department's laboratories. It includes 166 Mission Activity Profiles, organized by major mission area, with each representing a discrete budget function called a Budget and Reporting (B ampersand R) Code. The activities profiled here encompass the total research and technology development funding of the laboratories from the Department. Each profile includes a description of the activity and shows how the funding for that activity is distributed among the DOE laboratories as well as universities and industry. The profiles also indicate the principal laboratories for each activity, as well as which other laboratories are involved. The information in this volume is at the core of the Strategic Laboratory Mission Plan. It enables a reader to follow funds from the Department's appropriation to a specific activity description and to specific R ampersand D performing institutions. This information will enable the Department, along with the Laboratory Operations Board and Congress, to review the distribution of R ampersand D performers chosen to execute the Department's missions

  7. Draft Strategic Laboratory Missions Plan. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This volume described in detail the Department`s research and technology development activities and their funding at the Department`s laboratories. It includes 166 Mission Activity Profiles, organized by major mission area, with each representing a discrete budget function called a Budget and Reporting (B & R) Code. The activities profiled here encompass the total research and technology development funding of the laboratories from the Department. Each profile includes a description of the activity and shows how the funding for that activity is distributed among the DOE laboratories as well as universities and industry. The profiles also indicate the principal laboratories for each activity, as well as which other laboratories are involved. The information in this volume is at the core of the Strategic Laboratory Mission Plan. It enables a reader to follow funds from the Department`s appropriation to a specific activity description and to specific R & D performing institutions. This information will enable the Department, along with the Laboratory Operations Board and Congress, to review the distribution of R & D performers chosen to execute the Department`s missions.

  8. Prospective descriptive study of the toxicity of CAPOX plan in systemic treatment of colorectal cancer; Estudio descriptivo prospectivo de la toxicidad del plan CAPOX en el tratamiento sistemico del cancer colorrectal

    Energy Technology Data Exchange (ETDEWEB)

    Aghazarian, M; Larranaga, J; Reyes, G; Heinzen, S; Ferrero, L; Lasalvia, E; Echague, P; Estevez, F; Citrin, E; Viola, A. [Instituto Nacional del Cancer, Ministerio de Salud Publica. Montevideo (Uruguay)

    2010-11-15

    increased the number of LDH. Two patients had hyperbilirubinaemia, one grade 2 and one grade 3 to predominance of bilirubin indirect. Five patients had to discontinue treatment due to toxicity of the plan: 2 gastrointestinal (diarrhea G3), 2 and liver function (elevated bilirubin level 2 and 3) 1 cardiovascular (CF II effort angina). Of these 5 cases, in 4 patients the dose was reduced in the first instance and then rotate to another chemotherapy regimen and only patient who presented effort angina permanently stopped treatment. Conclusions: This is the first prospective descriptive work in the INCA to describe the toxicity of treatment a prevalent disease such as CCR. The most frequent toxicities observed in our study similar to those described in the international literature. Most adverse events occurred were mild to moderate (grade 1 and 2) where the toxicities grade 3 and more frequent gastrointestinal and hepatic level 4. The number Low of patients included could be due to the recent introduction of new drugs in the treatment of Metastatic RCC not included in this study as well as the non-inclusion of capecitabine also mono drug often used in metastatic CRC in elderly patients.

  9. Marketing Plan sebagai Upaya Pencapaian Strategi Pemasaran Perusahaan Jangka Panjang

    OpenAIRE

    Triastity, Rahayu

    2011-01-01

    Marketing plan is an important element in a company business plan. Marketing plan is conducted annually focused on implementation of decision dealing with marketing variable mix that is product, price, distribution, and promotion. Marketing plan must be monitored regularly especially in the beginning stage, as part of business plan. Marketing plan provides data for the company about neighborhood description, tactics and specific objectives that will be achieved. Marketing plan also describes ...

  10. Description of a materials/coolant laboratory for support of the Breeder Reactor Technology Shipping Program

    International Nuclear Information System (INIS)

    Rack, H.J.; Rohde, R.W.

    1979-04-01

    A description of a facility devoted to evaluating the environmental compatibility and mechanical response of materials suitable for a breeder reactor spent-fuel shipping cask is given. The facility presently consists of a closed-loop servo-controlled hydraulic, horizontal test system coupled to an environmental chamber, generalized mechanical test equipment and high-rate mechanical behavior apparatus. Future plans include the procurement of real-time computer control equipment which will be used to assess the effects of complex load-time histories on spent-fuel shipping cask materials

  11. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.3.5 through 8.3.5.20

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 68 figs., 102 tabs.

  12. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.4 through 8.7; Glossary and Acronyms

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Section 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 88 figs., 42 tabs

  13. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 6, Part B: Chapter 8, Sections 8.3.2 through 8.3.4.4

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 35 figs., 70 tabs

  14. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.3.5 through 8.3.5.20

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 68 figs., 102 tabs

  15. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.4 through 8.7; Glossary and Acronyms

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Section 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 88 figs., 42 tabs.

  16. Master plans for pedestrian and bicycle transportation: community characteristics.

    Science.gov (United States)

    Steinman, Lesley; Doescher, Mark; Levinger, David; Perry, Cynthia; Carter, Louise; Eyler, Amy; Aytur, Semra; Cradock, Angie L I; Evenson, Kelly R; Heinrich, Katie; Kerr, Jacqueline; Litt, Jill; Severcan, Yucel; Voorhees, Carolyn

    2010-03-01

    Recent research demonstrates the importance of targeting the built environment to support individual physical activity, particularly for people experiencing health disparities. Master plans to promote biking and/or pedestrians (BPMPs) are a potential method for environmental change. This descriptive study aims to provide a snapshot of plan attributes and better understand demographic, social and transportation characteristics of communities with BPMPs. We collected a census sample of BPMPs from 4 states. Population and commuting data were obtained from national statistics. 294 master plans were included, with most plans representing municipalities. 62% of plans targeted biking only, one-fifth targeted biking and walking, and 15% targeted walking only. The sampled locations have a similar demographic profile as the overall U.S. for median age and household income, people of color, high school education, and income inequality. The degree of racial diversity of sampled communities is slightly less than the U.S. average and the percentage of people who walk to work were slightly higher. Given that communities with master plans have a similar profile as the overall U.S., BPMPs could feasibly be spread to communities throughout the country. Further research is planned to describe BPMPs in detail toward informing future plan development.

  17. 324 Building REC and HLV Tank Closure Plan

    International Nuclear Information System (INIS)

    Becker-Khaleel, B.; Schlick, K.

    1995-12-01

    This closure plan describes the activities necessary to close the 324 Radiochemical Engineering Cells (REC) and High-Level Vault (HLV) in accordance with the Washington State Dangerous Waste regulations. To provide a complete description of the activities required, the closure plan relies on information contained in the 324 Building B-Cell Safety Cleanout Project (BCCP) plans, the 324 Building REC HLV Interim Waste Management Plan (IWMP), the Project Management Plan for Nuclear Facilities Management 300 Area Compliance Program, and the 324 High Level Vault Interim Removal Action Project (project management plan [PMP]). The IWMP addresses the management of mixed waste in accordance with state and federal hazardous waste regulations. It provides a strategy for managing high-activity mixed waste in compliance with Resource Conservation and Recovery Act (RCRA) requirements or provides for an alternative management approach for the waste. The BCCP outlines the past, present, and future activities necessary for removing from B-Cell the solid waste, including mixed waste generated as a result of historical research and development (R ampersand D) activities conducted in the cell. The BCCP also includes all records and project files associated with the B-Cell cleanout. This information is referenced throughout the closure plan. The PMP sets forth the plans, organization, and systems that Pacific Northwest National Laboratory (PNNL) will use to direct and control the 324 High-Level Vault Interim Removal Action Project. This project will develop and implement a treatment strategy that will remove and stabilize the inventory of liquid waste from the 324 HLV tanks. The PMP also provides for flushing and sampling the flush solution

  18. National Energy Audit Tool for Multifamily Buildings Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Malhotra, Mini [ORNL; MacDonald, Michael [Sentech, Inc.; Accawi, Gina K [ORNL; New, Joshua Ryan [ORNL; Im, Piljae [ORNL

    2012-03-01

    The U.S. Department of Energy's (DOE's) Weatherization Assistance Program (WAP) enables low-income families to reduce their energy costs by providing funds to make their homes more energy efficient. In addition, the program funds Weatherization Training and Technical Assistance (T and TA) activities to support a range of program operations. These activities include measuring and documenting performance, monitoring programs, promoting advanced techniques and collaborations to further improve program effectiveness, and training, including developing tools and information resources. The T and TA plan outlines the tasks, activities, and milestones to support the weatherization network with the program implementation ramp up efforts. Weatherization of multifamily buildings has been recognized as an effective way to ramp up weatherization efforts. To support this effort, the 2009 National Weatherization T and TA plan includes the task of expanding the functionality of the Weatherization Assistant, a DOE-sponsored family of energy audit computer programs, to perform audits for large and small multifamily buildings This report describes the planning effort for a new multifamily energy audit tool for DOE's WAP. The functionality of the Weatherization Assistant is being expanded to also perform energy audits of small multifamily and large multifamily buildings. The process covers an assessment of needs that includes input from national experts during two national Web conferences. The assessment of needs is then translated into capability and performance descriptions for the proposed new multifamily energy audit, with some description of what might or should be provided in the new tool. The assessment of needs is combined with our best judgment to lay out a strategy for development of the multifamily tool that proceeds in stages, with features of an initial tool (version 1) and a more capable version 2 handled with currently available resources. Additional

  19. System Description for Tank 241-AZ-101 Waste Retrieval Data Acquisition System

    International Nuclear Information System (INIS)

    ROMERO, S.G.

    2000-01-01

    The proposed activity provides the description of the Data Acquisition System for Tank 241-AZ-101. This description is documented in HNF-5572, Tank 241-AZ-101 Waste Retrieval Data Acquisition System (DAS). This activity supports the planned mixer pump tests for Tank 241-AZ-101. Tank 241-AZ-101 has been selected for the first full-scale demonstration of a mixer pump system. The tank currently holds over 960,000 gallons of neutralized current acid waste, including approximately 12.7 inches of settling solids (sludge) at the bottom of the tank. As described in Addendum 4 of the FSAR (LMHC 2000a), two 300 HP mixer pumps with associated measurement and monitoring equipment have been installed in Tank 241-AZ-101. The purpose of the Tank 241-AZ-101 retrieval system Data Acquisition System (DAS) is to provide monitoring and data acquisition of key parameters in order to confirm the effectiveness of the mixer pumps utilized for suspending solids in the tank. The suspension of solids in Tank 241-AZ-101 is necessary for pretreatment of the neutralized current acid waste and eventual disposal as glass via the Hanford Waste Vitrification Plant. HNF-5572 provides a basic description of the Tank 241-AZ-101 retrieval system DAS, including the field instrumentation and application software. The DAS is provided to fulfill requirements for data collection and monitoring. This document is not an operations procedure or is it intended to describe the mixing operation. This USQ screening provides evaluation of HNF-5572 (Revision 1) including the changes as documented on ECN 654001. The changes include (1) add information on historical trending and data backup, (2) modify DAS I/O list in Appendix E to reflect actual conditions in the field, and (3) delete IP address in Appendix F per Lockheed Martin Services, Inc. request

  20. Program plan for the resolution of tank vapor issues

    International Nuclear Information System (INIS)

    Osborne, J.W.

    1992-09-01

    The purpose of this document is to provide a detailed description of the priorities, logic, work breakdown structure (WBS), task descriptions, and program milestones required for the resolution of tank vapor issues associated with the single-shell tanks (SST) and double-shell tanks (DST). The primary objective of this plan is to determine whether a health (personnel exposure) and/or safety (flammability) hazard exists. This plan is focused upon one waste tank, 241-C-103, but contains all elements required to bring the vapor issues to resolution

  1. Navy Health Care Strategic Planning Process: A Draft Functional Description

    Science.gov (United States)

    1993-09-01

    are: 1. Conduct Health Care Planning 2. Manage Human Resoutrce 3. Manage Finances 4. Manag Education and Training 5. Provide Health Care Support to...and general officer medical records. This module is underdevelopment. 3. Manage Finances . This module is designed to be used by comptrollers. It assists

  2. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Science.gov (United States)

    2010-07-01

    ... compliance, waste minimization, risk reduction and continual improvement of the environmental management... its compliance with the Environmental Management Plan and applicable federal and state hazardous waste... laboratory environmental management plan? 262.105 Section 262.105 Protection of Environment ENVIRONMENTAL...

  3. Atmospheric chemistry: Description of the area of performance and a working plan

    Science.gov (United States)

    Kirchhoff, Volker W. J. H.

    1986-11-01

    INPE's program in Atmospheric Chemistry Research is described. Research in this area is concerned with atmospheric gases and their chemical reactions, production and loss rates, and their interactions with the biosphere. Atmospheric chemistry includes concepts in Physics, Chemistry, Meteorology, and Biology, which gives it a strong interdisciplinary character. The interaction of some of the atmospheric gases with the biosphere, such as ozone, is very strong and direct. Studying atmospheric chemistry is, therefore, of direct interest to man and the quality of life. Details are described to define the objectives of study, in particular those of our research program at INPE. A working plan is proposed in order to reach the defined goals. Owing to the large anthropogenic interference in the balance of the natural atmosphere it is anticipated that a better understanding of Atmospheric Chemistry will be the great scientific challenge of the next decade.

  4. Constraint-based Attribute and Interval Planning

    Science.gov (United States)

    Jonsson, Ari; Frank, Jeremy

    2013-01-01

    In this paper we describe Constraint-based Attribute and Interval Planning (CAIP), a paradigm for representing and reasoning about plans. The paradigm enables the description of planning domains with time, resources, concurrent activities, mutual exclusions among sets of activities, disjunctive preconditions and conditional effects. We provide a theoretical foundation for the paradigm, based on temporal intervals and attributes. We then show how the plans are naturally expressed by networks of constraints, and show that the process of planning maps directly to dynamic constraint reasoning. In addition, we de ne compatibilities, a compact mechanism for describing planning domains. We describe how this framework can incorporate the use of constraint reasoning technology to improve planning. Finally, we describe EUROPA, an implementation of the CAIP framework.

  5. Decenal plan of electric energy expansion - 2006-2015

    International Nuclear Information System (INIS)

    2005-01-01

    This report is divided into seven chapters and presents: 1) Introduction - a brief description of the institutional context of the study and the decenal planning role in this context; 2) electric power market - the evolution of market and economy conjuncture of electric power and the basic premises for the market projections, including the considered macroeconomic scenery description; 3) electric power generation - considered premises, methodology and criteria for the formulation and adjustment of generation expansion alternatives of electric power; 4) electric power transmission - main aspects which guided the evolution of the interlinked system reference configuration in the decenal period and a description of the main result of transmission system expansion analysis, consolidated by SIN geoelectric region and by each state of these regions; 5) socioenvironmental analysis - adopted methodology and the results of the socioenvironmental analysis for the foreseen business in the decenal horizon; 6) expansion indicators of the electric system - synthesizes the main indicators referring to the decenal period as far the market evolution, generation expansion and transmission is concerned; 7)bibliographic references

  6. Decenal plan of electric energy expansion - 2006-2015

    International Nuclear Information System (INIS)

    2006-01-01

    This report is divided into seven chapters and presents: 1) Introduction - a brief description of the institutional context of the study and the decenal planning role in this context; 2) electric power market - the evolution of market and economy conjuncture of electric power and the basic premises for the market projections, including the considered macroeconomic scenery description; 3) electric power generation - considered premises, methodology and criteria for the formulation and adjustment of generation expansion alternatives of electric power; 4) electric power transmission - main aspects which guided the evolution of the interlinked system reference configuration in the decenal period and a description of the main result of transmission system expansion analysis, consolidated by SIN geoelectric region and by each state of these regions; 5) socioenvironmental analysis - adopted methodology and the results of the socioenvironmental analysis for the foreseen business in the decenal horizon; 6) expansion indicators of the electric system - synthesizes the main indicators referring to the decenal period as far the market evolution, generation expansion and transmission is concerned; 7)bibliographic references

  7. Plans, preferences or going with the flow: An online exploration of women's views and experiences of birth plans.

    Science.gov (United States)

    Divall, Bernie; Spiby, Helen; Nolan, Mary; Slade, Pauline

    2017-11-01

    To explore women's views of birth plans, and experiences of their completion and use. A qualitative, descriptive study, using Internet-mediated research methods. The discussion boards of two well-known, UK-based, online parenting forums, where a series of questions relating to birth plans were posted. Members of the selected parenting forums who had written and used, or who had chosen not to write or use, a birth plan. Women responded with a range of views and experiences relating to the completion and use of birth plans. The benefits of birth plans were described in terms of communication with healthcare professionals, potentially enhancing awareness of available options, and maintaining a sense of control during labour and birth. However, many respondents believed the idea of 'planning' birth was problematic, and described a reluctance to write a formal plan. The support of healthcare professionals, particularly midwives, was considered essential to the success of both writing and using birth plans. Our findings show a continued debate among women on the benefits and challenges involved in writing and using birth plans, suggesting problems for a 'one size fits all' approach often seen in the use of birth plan templates. In the context of maternity policy supporting women's choice and personalised care, and as a way of acknowledging perceived problems of 'planning' for birth, a flexible approach to birth plans is required, including the consideration of employing alternative nomenclature. Birth plans remain a point of contention in care contexts around the world. Midwives and other healthcare providers play a central role in supporting women to discuss available options, whether or not they decide to complete a formal birth plan. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Readability, suitability, and characteristics of asthma action plans: examination of factors that may impair understanding.

    Science.gov (United States)

    Yin, H Shonna; Gupta, Ruchi S; Tomopoulos, Suzy; Wolf, Michael S; Mendelsohn, Alan L; Antler, Lauren; Sanchez, Dayana C; Lau, Claudia Hillam; Dreyer, Benard P

    2013-01-01

    Recognition of the complexity of asthma management has led to the development of asthma treatment guidelines that include the recommendation that all pediatric asthma patients receive a written asthma action plan. We assessed the readability, suitability, and characteristics of asthma action plans, elements that contribute to the effectiveness of action plan use, particularly for those with limited literacy. This was a descriptive study of 30 asthma action plans (27 state Department of Health (DOH)-endorsed, 3 national action plans endorsed by 6 states). (1) readability (as assessed by Flesch Reading Ease, Flesch-Kincaid, Gunning Fog, Simple Measure of Gobbledygook, Forcast), (2) suitability (Suitability Assessment of Materials [SAM], adequate: ≥ 0.4; unsuitable: typography (30.0%), learning stimulation/motivation (26.7%), and graphics (13.3%). There were no statistically significant differences between the average grade level or SAM score of state DOH developed action plans and those from or adapted from national organizations. Plans varied with respect to terms used, symptoms included, and recommended actions. Specific improvements in asthma action plans could maximize patient and parent understanding of appropriate asthma management and could particularly benefit individuals with limited literacy skills.

  9. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP`s disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II.

  10. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    International Nuclear Information System (INIS)

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP's disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II

  11. "Before the war we had it all": Family planning among couples in a post-conflict setting.

    Science.gov (United States)

    Warren, Nicole; Alvarez, Carmen; Makambo, Maphie Tosha; Johnson-Agbakwu, Crista; Glass, Nancy

    2017-08-01

    There is little evidence about family planning knowledge, attitudes, and use among couples in post-conflict Democratic Republic of the Congo. We used qualitative descriptions to analyze data from 75 participants. Intimate partner violence (IPV) was common among participants. They were aware of family planning methods; however, IPV and fears of side effects were barriers to use. Although participants were concerned about the cost of large families, had positive attitudes toward family planning, and intended to use it, actual use was uncommon. The need for family planning was acute because of war-related poverty. Couples negotiated, but men had strong influence over family planning decisions. Couples saw health workers as a valuable resource. Interventions in this setting should include a couple-based approach that addresses IPV as well as family planning content.

  12. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    Science.gov (United States)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  13. 303-K Radioactive Mixed-Waste Storage Facility closure plan

    International Nuclear Information System (INIS)

    1991-11-01

    The Hanford Site, located northwest of Richland, Washington, houses reactors chemical-separation systems, and related facilities used for the production o special nuclear materials. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 303-K Radioactive Mixed-Waste Storage Facility (303-K Facility) has been used since 1943 to store various radioactive,and dangerous process materials and wastes generated by the fuel manufacturing processes in the 300 Area. The mixed wastes are stored in US Department of Transportation (DOT)-specification containers (DOT 1988). The north end of the building was used for storage of containers of liquid waste and the outside storage areas were used for containers of solid waste. Because only the north end of the building was used, this plan does not include the southern end of the building. This closure plan presents a description of the facility, the history of materials and wastes managed, and a description of the procedures that will be followed to chose the 303-K Facility as a greater than 90-day storage facility. The strategy for closure of the 303-K Facility is presented in Chapter 6.0

  14. Facility effluent monitoring plan for the 324 Facility

    International Nuclear Information System (INIS)

    1994-11-01

    The 324 Facility [Waste Technology Engineering Laboratory] in the 300 Area primarily supports the research and development of radioactive and nonradioactive waste vitrification technologies, biological waste remediation technologies, spent nuclear fuel studies, waste mixing and transport studies, and tritium development programs. All of the above-mentioned programs deal with, and have the potential to, release hazardous and/or radioactive material. The potential for discharge would primarily result from (1) conducting research activities using the hazardous materials, (2) storing radionuclides and hazardous chemicals, and (3) waste accumulation and storage. This report summarizes the airborne and liquid effluents, and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterizing effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements

  15. Perceptions about family planning and contraceptive practice in a marital dyad.

    Science.gov (United States)

    Lee, Taewha; Lee, Hyeonkyeong; Ahn, Hyun Mi; Jang, Younkyoung; Shin, Hyejeong; Kim, Myeong Seon

    2014-04-01

    To examine couple interactions to predict wives' contraceptive use as well as that of their husbands in rural Ethiopia. Previous studies stated that men's power and their preferences regarding family planning have a significant role in the adoption of contraception, as well as women's general reproductive health. Spousal communication on reproductive matters helped couples to be aware of each other's perspectives and enhanced the usage of family planning through shared decision-making. A cross-sectional descriptive design was used to analyse the Actor and Partner effects within the marital dyad. The study sample included 389 married couples who were recruited from households in seven enumeration areas randomly selected from Hetosa Woreda in Ethiopia. We used a face-to-face interview survey. Data were collected between 22 October and 21 November 2010 and analysed using descriptive statistics, chi-squared test, t-test, Pearson's correlation and the Actor-Partner interdependence model. There were significant differences in perceptions about family planning, contraceptive knowledge and contraceptive use between wives and husbands. Wives' perceptions about family planning affected theirs as well as that of their husbands' knowledge and use of contraceptive methods. However, husbands' perceptions about family planning did not affect their knowledge and use of contraceptive methods, but did influence their wives'. The application of couple data enhanced our understanding of the complex interactions between wives and husbands, which may lead to novel dyadic-based interventions to improve family planning practice. Couples must be educated and informed not only about the adoption of contraception, but also about reproductive rights and responsibilities through changes in educational and motivational strategies. © 2013 John Wiley & Sons Ltd.

  16. Department of Energy Environmental Management Plan for Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1984-01-01

    The Environmental Program Management Plan for the Oak Ridge Complex was prepared in response to recommendations made at the Congressional hearing held in Oak Ridge on July 11, 1983, to discuss the extent and impact of mercury and other pollutants from DOE's Oak Ridge facilities. While this is a planning document and not a commitment of funds, this effort will help to focus DOE resources toward resolving environmental problems at Oak Ridge in a timely and cost-effective manner. The plan includes: (1) an environmental planning basis; (2) a brief description of the problems and proposed resolutions for each plant; (3) research and development requirements and funding schedules; (4) funding schedule summaries; and (5) continuing analyses and unresolved issues. The planning basis provides the foundation for identifying the environmental problems and their potential resolutions. While applicable environmental standards must be met, there is considerable latitude for interpretation of existing regulations and projection of future requirements. This latitude can have a significant impact on funding and scheduling. 11 figures, 8 tables

  17. Mathematical description for the measurement and verification of energy efficiency improvement

    International Nuclear Information System (INIS)

    Xia, Xiaohua; Zhang, Jiangfeng

    2013-01-01

    Highlights: • A mathematical model for the measurement and verification problem is established. • Criteria to choose the four measurement and verification options are given. • Optimal measurement and verification plan is defined. • Calculus of variations and optimal control can be further applied. - Abstract: Insufficient energy supply is a problem faced by many countries, and energy efficiency improvement is identified as the quickest and most effective solution to this problem. Many energy efficiency projects are therefore initiated to reach various energy saving targets. These energy saving targets need to be measured and verified, and in many countries such a measurement and verification (M and V) activity is guided by the International Performance Measurement and Verification Protocol (IPMVP). However, M and V is widely regarded as an inaccurate science: an engineering practice relying heavily on professional judgement. This paper presents a mathematical description of the energy efficiency M and V problem and thus casts into a scientific framework the basic M and V concepts, propositions, techniques and methodologies. For this purpose, a general description of energy system modeling is provided to facilitate the discussion, strict mathematical definitions for baseline and baseline adjustment are given, and the M and V plan development is formulated as an M and V modeling problem. An optimal M and V plan is therefore obtained through solving a calculus of variation, or equivalently, an optimal control problem. This approach provides a fruitful source of research problems by which optimal M and V plans under various practical constraints can be determined. With the aid of linear control system models, this mathematical description also provides sufficient conditions for M and V practitioners to determine which one of the four M and V options in IPMVP should be used in a practical M and V project

  18. Performance Confirmation Plan

    International Nuclear Information System (INIS)

    Lindner, E.N.

    2000-01-01

    As described, the purpose of the Performance Confirmation Plan is to specify monitoring, testing, and analysis activities for evaluating the accuracy and adequacy of the information used to determine that performance objectives for postclosure will be met. This plan defines a number of specific performance confirmation activities and associated test concepts in support of the MGR that will be implemented to fulfill this purpose. In doing so, the plan defines an approach to identify key factors and processes, predict performance, establish tolerances and test criteria, collect data (through monitoring, testing, and experiments), analyze these data, and recommend appropriate action. The process of defining which factors to address under performance confirmation incorporates input from several areas. In all cases, key performance confirmation factors are those factors which are: (1) important to safety, (2) measurable and predictable, and (3) relevant to the program (i.e., a factor that is affected by construction, emplacement, or is a time-dependent variable). For the present version of the plan, performance confirmation factors important to safety are identified using the principal factors from the RSS (CRWMS M and O 2000a) (which is derived from TSPA analyses) together with other available performance assessment analyses. With this basis, key performance confirmation factors have been identified, and test concepts and test descriptions have been developed in the plan. Other activities are also incorporated into the performance confirmation program outside of these key factors. Additional activities and tests have been incorporated when they are prescribed by requirements and regulations or are necessary to address data needs and model validation requirements relevant to postclosure safety. These other activities have been included with identified factors to construct the overall performance confirmation program

  19. Performance Confirmation Plan

    International Nuclear Information System (INIS)

    Lindner, E.N.

    2000-01-01

    As described, the purpose of the Performance Confirmation Plan is to specify monitoring, testing, and analysis activities for evaluating the accuracy and adequacy of the information used to determine that performance objectives for postclosure will be met. This plan defines a number of specific performance confirmation activities and associated test concepts in support of the MGR that will be implemented to fulfill this purpose. In doing so, the plan defines an approach to identify key factors and processes, predict performance, establish tolerances and test criteria, collect data (through monitoring, testing, and experiments), analyze these data, and recommend appropriate action. The process of defining which factors to address under performance confirmation incorporates input from several areas. In all cases, key performance confirmation factors are those factors which are: (1) important to safety, (2) measurable and predictable, and (3) relevant to the program (i.e., a factor that i s affected by construction, emplacement, or is a time-dependent variable). For the present version of the plan, performance confirmation factors important to safety are identified using the principal factors from the RSS (CRWMS M and O 2000a) (which is derived from TSPA analyses) together with other available performance assessment analyses. With this basis, key performance confirmation factors have been identified, and test concepts and test descriptions have been developed in the plan. Other activities are also incorporated into the performance confirmation program outside of these key factors. Additional activities and tests have been incorporated when they are prescribed by requirements and regulations or are necessary to address data needs and model validation requirements relevant to postclosure safety. These other activities have been included with identified factors to construct the overall performance confirmation program

  20. 40 CFR 233.11 - Program description.

    Science.gov (United States)

    2010-07-01

    ... organization and structure of the State agency (agencies) which will have responsibility for administering the... under § 233.10 shall include: (a) A description of the scope and structure of the State's program. The... will coordinate its enforcement strategy with that of the Corps and EPA; (h) A description of the...

  1. Token Economy: A Systematic Review of Procedural Descriptions.

    Science.gov (United States)

    Ivy, Jonathan W; Meindl, James N; Overley, Eric; Robson, Kristen M

    2017-09-01

    The token economy is a well-established and widely used behavioral intervention. A token economy is comprised of six procedural components: the target response(s), a token that functions as a conditioned reinforcer, backup reinforcers, and three interconnected schedules of reinforcement. Despite decades of applied research, the extent to which the procedures of a token economy are described in complete and replicable detail has not been evaluated. Given the inherent complexity of a token economy, an analysis of the procedural descriptions may benefit future token economy research and practice. Articles published between 2000 and 2015 that included implementation of a token economy within an applied setting were identified and reviewed with a focus on evaluating the thoroughness of procedural descriptions. The results show that token economy components are regularly omitted or described in vague terms. Of the articles included in this analysis, only 19% (18 of 96 articles reviewed) included replicable and complete descriptions of all primary components. Missing or vague component descriptions could negatively affect future research or applied practice. Recommendations are provided to improve component descriptions.

  2. Being safe: making the decision to have a planned home birth in the United States.

    Science.gov (United States)

    Lothian, Judith A

    2013-01-01

    Although there is evidence that supports the safety of planned home birth for healthy women, less than 1 percent of women in the United States choose to have their baby at home. An ethnographic study of the experience of planned home birth provided rich descriptions of women's experiences planning, preparing for, and having a home birth.This article describes findings related to how women make the decision to have a planned home birth. For these women, being safe emerged as central in making the decision. For them, being safe included four factors: avoiding technological birth interventions, knowing the midwife and the midwife knowing them, feeling comfortable and protected at home, and knowing that backup hospital medical care was accessible if needed.

  3. A comparative study in disaster planning in selected countries

    Directory of Open Access Journals (Sweden)

    Mahmode M

    2007-11-01

    Full Text Available Background: Assessment of different strategic in disaster planning in selected countries. According to the international report indicating that IRAN is among the seven countries most susceptible to disaster, experiencing 31 known disasters out of 40 in the world, occurrence of 1536 moderate to severe earthquake, during 1370-80 and 712 other disasters at the same period it seems necessary to design a disaster plan."nMethods: This research is a comparative-descriptive and case based study in which the researcher used random sampling process in selecting the statistical society from both developed and developing countries. In this goal oriented research the necessary information are extracted from valid global reports, articles and many questionnaires which were subjected to scientific analysis."nResults: Studying different countries (which includes: Canada, Japan, India, USA, Turkey, Pakistan and Iran shows that there is a direct relationship between the level of countries development and their success in disaster planning and management (including preventive measures and confrontation. In most of the studied countries, decentralized planning caused many professional planners participate in different levels of disaster management which ultimately led to development of efficient and realistic plans which in turn decreased the catastrophic effects of disasters dramatically. The results of the aforementioned countries showed that a balanced approach to disaster plan with investment in prophylactic area is very important."nConclusion: As our country uses a centralized strategy for disaster management which has proven its ineffectiveness, the researcher suggests that we should change our approach in disaster management and let our planners participate from all levels include: provincial, rural and etc. This will led to a reality based planning and using all potential capacities in disaster management. According to this study it will be possible to use

  4. CarSim: Automatic 3D Scene Generation of a Car Accident Description

    OpenAIRE

    Egges, A.; Nijholt, A.; Nugues, P.

    2001-01-01

    The problem of generating a 3D simulation of a car accident from a written description can be divided into two subtasks: the linguistic analysis and the virtual scene generation. As a means of communication between these two system parts, we designed a template formalism to represent a written accident report. The CarSim system processes formal descriptions of accidents and creates corresponding 3D simulations. A planning component models the trajectories and temporal values of every vehicle ...

  5. 3-D conformal radiation therapy - Part I: Treatment planning

    International Nuclear Information System (INIS)

    Burman, Chandra M.; Mageras, Gikas S.

    1997-01-01

    Objective: In this presentation we will look into the basic components of 3-dimensional conformal treatment planning, and will discuss planning for some selected sites. We will also review some current and future trends in 3-D treatment planning. External beam radiation therapy is one of the arms of cancer treatment. In the recent years 3-D conformal therapy had significant impact on the practice of external beam radiation therapy. Conformal radiation therapy shapes the high-dose volume so as to conform to the target volume while minimizing the dose to the surrounding normal tissues. The advances that have been achieved in conformal therapy are in part due to the development of 3-D treatment planning, which in turn has capitalized on 3-D imaging for tumor and normal tissue localization, as well as on available computational power for the calculation of 3-D dose distributions, visualization of anatomical and dose volumes, and numerical evaluation of treatment plans. In this course we will give an overview of how 3-D conformal treatments are designed and transferred to the patient. Topics will include: 1) description of the major components of a 3-D treatment planning system, 2) techniques for designing treatments, 3) evaluation of treatment plans using dose distribution displays, dose-volume histograms and normal tissue complication probabilities, 4) implementation of treatments using shaped blocks and multileaf collimators, 5) verification of treatment delivery using portal films and electronic portal imaging devices. We will also discuss some current and future trends in 3-D treatment planning, such as field shaping with multileaf collimation, computerized treatment plan optimization, including the use of nonuniform beam profiles (intensity modulation), and incorporating treatment uncertainties due to patient positioning errors and organ motion into treatment planning process

  6. Task Action Plans for generic activities: Category A

    International Nuclear Information System (INIS)

    1978-10-01

    The document contains listings of generic technical activities as identified and placed in priority categories by the Office of Nuclear Reactor Regulation (NRR). In addition, it contains definitions of Priority Categories A, B, C, and D and copies of forty approved Task Action Plans for Category A activites. Problem Descriptions for the Category B, C and D tasks are contained in NUREG--0471. This material was developed within the context of NRR's Program for the Resolution of Generic Issues Related to Nuclear Power Plants. As part of this program, the assignment of identified issues to priority categories and the approval of Task Action Plans were made by NRR's Technical Activities Steering Committee, chaired by the Deputy Director, NRR. The original document was published in November 1977. In December 1977 it was updated to add the Task Action Plan for Task No. A-17, Systems Interactions in Nuclear Power Plants. This update adds Task Action Plans for Tasks A-13, A-18, A-21, A-22, A-32, A-37, A-38 and A-40. Task A-41 has been included in Task A-40. In addition, as part of this update, the following changes were made to each Task Action Plan (with the exception of the Task Action Plan for Task A-9): (1) a title page was added that includes information such as Lead NRR Organization, Lead Supervisor, Task Manager, Applicability, and Projected Completion Date; (2) detailed schedule information was deleted; and (3) a new Section 3 entitled Basis for Continued Plant Operation and Licensing Pending Completion of Task was added. These changes represent general reformatting and the addition or deletion of certain general types of information. Some substantive revisions were made to several of the plans, however, a general revision of all of the plans was not undertaken at this time

  7. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    International Nuclear Information System (INIS)

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  8. Hanford Waste Vitrification Plant: Preliminary description of waste form and canister

    International Nuclear Information System (INIS)

    Mitchell, D.E.

    1986-01-01

    In July 1985, the US Department of Energy's Office of Civilian Radioactive Waste Management established the Waste Acceptance Process as the means by which defense high-level waste producers, such as the Hanford Waste Vitrification Plant, will develop waste acceptance requirements with the candidate geologic repositories. A complete description of the Waste Acceptance Process is contained in the Preliminary Hanford Waste Vitrification Plant Waste Form Qualification Plan. The Waste Acceptance Process defines three documents that high-level waste producers must prepare as a part of the process of assuming that a high-level waste product will be acceptable for disposal in a geologic repository. These documents are the Description of Waste Form and Canister, Waste Compliance Plan, and Waste Qualification Report. This document is the Hanford Waste Vitrification Plant Preliminary Description of Waste Form and Canister for disposal of Neutralized Current Acid Waste. The Waste Acceptance Specifications for the Hanford Waste Vitrification Plant have not yet been developed, therefore, this document has been structured to corresponds to the Waste Acceptance Preliminary Specifications for the Defense Waste Processing Facility High-Level Waste Form. Not all of the information required by these specifications is appropriate for inclusion in this Preliminary Description of Waste Form and Canister. Rather, this description is limited to information that describes the physical and chemical characteristics of the expected high-level waste form. The content of the document covers three major areas: waste form characteristics, canister characteristics, and canistered waste form characteristics. This information will be used by the candidate geologic repository projects as the basis for preliminary repository design activities and waste form testing. Periodic revisions are expected as the Waste Acceptance Process progresses

  9. Business plan: A preliminary approach to an unknown genre

    Directory of Open Access Journals (Sweden)

    Federico Navarro

    2015-11-01

    Full Text Available The business plan has been widely included in the curricula of economics degrees and is key to business practice worldwide, but has not been studied from a socio-discursive perspective yet due to restrictions in its social, spatial, and temporal circulation. Based on interviews and a qualitative analysis of a corpus of 38 texts written in Spanish, I aim to provide a preliminary description of the genre. Results indicate that a chain of four phases is associated to a continuum of social settings organized through entrepreneurial/corporate and expert/training variables; its rhetorical structure includes “describing present/potential situation of the company and market” and “describing future processes of strategic actions regarding the marketing, production, and financial plans”. This analysis offers methodological innovations to account for occluded genres, encourages the contrastive study of the business plan in different cultural and linguistic environments, and assists business teachers with a situated picture of the genre

  10. 11. Strategic planning.

    Science.gov (United States)

    2014-05-01

    There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.

  11. CRAC2 model description

    International Nuclear Information System (INIS)

    Ritchie, L.T.; Alpert, D.J.; Burke, R.P.; Johnson, J.D.; Ostmeyer, R.M.; Aldrich, D.C.; Blond, R.M.

    1984-03-01

    The CRAC2 computer code is a revised version of CRAC (Calculation of Reactor Accident Consequences) which was developed for the Reactor Safety Study. This document provides an overview of the CRAC2 code and a description of each of the models used. Significant improvements incorporated into CRAC2 include an improved weather sequence sampling technique, a new evacuation model, and new output capabilities. In addition, refinements have been made to the atmospheric transport and deposition model. Details of the modeling differences between CRAC2 and CRAC are emphasized in the model descriptions

  12. Generalizing: The descriptive struggle

    Directory of Open Access Journals (Sweden)

    Barney G. Glaser, Ph.D.; Hon Ph.D.

    2006-11-01

    Full Text Available The literature is not kind to the use of descriptive generalizations. Authors struggle and struggle to find and rationalize a way to use them and then fail in spite of trying a myriad of work-arounds. And then we have Lincoln and Guba’s famous statement: “The only generalization is: there is no generalization” in referring to qualitative research. (op cit, p. 110 They are referring to routine QDA yielding extensive descriptions, but which tacitly include conceptual generalizations without any real thought of knowledge about them. In this chapter I wish to explore this struggle for the purpose of explaining that the various contra arguments to using descriptive generalizations DO NOT apply to the ease of using conceptual generalizations yielded in SGT and especially FGT. I will not argue for the use of descriptive generalization. I agree with Lincoln and Guba with respect to QDA, “the only generalization is: there is no generalization.” It is up to the QDA methodologists, of whom there are many; to continue the struggle and I wish them well.

  13. 29 CFR 1956.60 - Description of the plan as initially approved.

    Science.gov (United States)

    2010-07-01

    ... a State poster, and required posting of notices of violations. The plan also provides for protection... compliance with an order has elapsed, and the employer has not contested and has not made a good faith effort...

  14. Atomic Energy Control Board 1991-92 estimates part III expenditure plan

    International Nuclear Information System (INIS)

    1991-01-01

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program's financial performance over the past year. 22 figs

  15. Atomic Energy Control Board 1991-92 estimates part III expenditure plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-12-31

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program`s financial performance over the past year. 22 figs.

  16. Atomic Energy Control Board 1992-93 estimates part III expenditure plan

    International Nuclear Information System (INIS)

    1992-01-01

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program's financial performance over the past year. 7 refs., 21 figs

  17. Atomic Energy Control Board 1992-93 estimates part III expenditure plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program`s financial performance over the past year. 7 refs., 21 figs.

  18. Emergency response plan for accidents in Saudi Arabia

    International Nuclear Information System (INIS)

    Al-Solaiman, K.M.; Al-Arfaj, A.M.; Farouk, M.A.

    2000-01-01

    This paper presents a brief description of the general emergency plan for accidents involving radioactive materials in the Kingdom of Saudi Arabia. Uses of radioactive materials and radiation sources and their associated potential accident are specified. Most general accident scenarios of various levels have been determined. Protective measures have been specified to reduce individual and collective doses arising during accident situations. Intervention levels for temporary exposure situations, as established in the IAEA's basic safety standards for protection against ionising radiation and for the safety of radiation sources, are adopted as national intervention levels. General procedures for implementation of the response plan, including notification and radiological monitoring instrumentation and equipment, are described and radiation monitoring teams are nominated. Training programs for the different parties which may be called upon to respond are studied and will be started. (author)

  19. ORCWM test and evaluaton master plan. Revision 00

    International Nuclear Information System (INIS)

    1995-08-01

    The Office of Civilian Radioactive Waste Management (OCRWM) Test and Evaluation Master Plan (TEMP) describes the program Test and Evaluation (T ampersand E) policy, objectives, requirements, general methodology (test flow and description of each T ampersand E phase), responsibilities, and scheduling of test phases for the Civilian Radioactive Waste Management System (CRWMS). This TEMP is a program-level management planning document for al CRWMS T ampersand E activities and will be used in conjunction with Section 11 of the Quality Assurance Requirements and Description (QARD), as appropriate, as a guide for the projects in developing their T ampersand E plans. In the OCRWM document hierarchy, that is described in the OCRWM Systems Engineering Management Plan (SEMP), the TEMP is subordinate to the program SEMP. To ensure CRWMS operates as an integrated system, the plans for verifying the performance and evaluating the operational suitability and effectiveness of the overall system are also described. Test and evaluation is an integral part of the systems engineering process. Key aspects of the systems engineering process, more fully described in the OCRWM SEMP, are discussed in this TEMP to illustrate how T ampersand E supports the overall systems engineering process

  20. Reliability and safety program plan outline for the operational phase of a waste isolation facility

    International Nuclear Information System (INIS)

    Ammer, H.G.; Wood, D.E.

    1977-01-01

    A Reliability and Safety Program plan outline has been prepared for the operational phase of a Waste Isolation Facility. The program includes major functions of risk assessment, technical support activities, quality assurance, operational safety, configuration monitoring, reliability analysis and support and coordination meetings. Detailed activity or task descriptions are included for each function. Activities are time-phased and presented in the PERT format for scheduling and interactions. Task descriptions include manloading, travel, and computer time estimates to provide data for future costing. The program outlined here will be used to provide guidance from a reliability and safety standpoint to design, procurement, construction, and operation of repositories for nuclear waste. These repositories are to be constructed under the National Waste Terminal Storage program under the direction of the Office of Waste Isolation, Union Carbide Corp. Nuclear Division

  1. AN ANALYSIS OF STUDENT‘S DESCRIPTIVE TEXT: SYSTEMIC FUNCTIONAL LINGUISTICS PERSPECTIVES

    Directory of Open Access Journals (Sweden)

    Rizka Maulina Wulandari

    2017-12-01

    Full Text Available In Indonesia where different languages co-exist, and where English is used as a foreign language, the learners‘ capabilities in writing toward English plays an important role in formulating effective learning method. This descriptive qualitative research aimed to investigate the student‘s errors in writing descriptive text in SFL perspectives. A secondary, yet important, objective of this research is also to design the appropriate pedagogical plans that can be used for junior high school students in Indonesian education based on the result of the research. The results indicated that the student has good control about the schematic structure of descriptive text although many of his idea still uses Indonesian context which make the reader can be confused in understanding his meaning. It can be concluded that there is intervention from L1, that is Indonesian language, while he wrote his descriptive text.. Hence, the study highlighted that cooperative learning could be an option as an appropriate learning method to solve the students problem on writing descriptive text.

  2. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  3. Remediation plan for contaminated areas by naturally occurring radioactivity materials in Syrian petroleum company oil fields

    International Nuclear Information System (INIS)

    Shwekani, R.; Al-Masri, M.S.; Awad, I.

    2005-08-01

    The present report contains a detailed plan for remediation of areas contaminated with naturally occurring radioactive materials in the Syrian petroleum company oil fields. This plan includes a description of the contaminated areas and the procedures that will be followed before and during the execution of the project in addition to the final radiation surveys according to the Syrian regulations. In addition, responsibilities of the main personnel who will carry out the work have been defined and the future monitoring program of the remediated areas was determined. (author)

  4. Remediation plan for contaminated areas by naturally occurring radioactivity materials in Syrian Petroleum Company oil fields

    International Nuclear Information System (INIS)

    Shweikani, R.; Al-Masri, M. S.; Awad, I.

    2006-01-01

    The present report contains a detailed plan for remediation of areas contaminated with naturally occurring radioactive materials in the syrian Petroleum Company Oil fields. This plan includes a description of the contaminated areas and the procedures that will be followed before and during the execution of the project in addition to the final radiation surveys according to the Syrian regulations. In addition, responsibilities of the main personnel who will carry out the work have been defined and the future monitoring program of the remediated areas was determined. (author)

  5. Gender Differences in College Leisure Time Physical Activity: Application of the Theory of Planned Behavior and Integrated Behavioral Model

    Science.gov (United States)

    Beville, Jill M.; Umstattd Meyer, M. Renée; Usdan, Stuart L.; Turner, Lori W.; Jackson, John C.; Lian, Brad E.

    2014-01-01

    Objective: National data consistently report that males participate in leisure time physical activity (LTPA) at higher rates than females. This study expanded previous research to examine gender differences in LTPA of college students using the theory of planned behavior (TPB) by including 2 additional constructs, descriptive norm and…

  6. 29 CFR 1952.350 - Description of the plan as initially approved.

    Science.gov (United States)

    2010-07-01

    ... Industrial Commission, Division of Occupational Safety and Health, as the State agency designated to administer the plan throughout the State. It adopts the definition of occupational safety and health issues... Section 1952.350 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH...

  7. Effluent monitoring Quality Assurance Project Plan for radioactive airborne emissions data. Revision 2

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1995-12-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports

  8. Preliminary site description. Simpevarp area - version 1.1

    Energy Technology Data Exchange (ETDEWEB)

    Winberg, Anders [ed.

    2004-08-01

    resolution. The lithology model includes four interpreted rock domains. The deformation zone model includes 14 zones of interpreted high confidence (of existence). A discrete fracture network model has also been developed where attempts are made to assess effects on fracturing imposed by interpreted deformation zones. Furthermore, the validity of extrapolating surface fracture statistics to larger depths was explored. The rock mechanics strength model is based on information from the Aespoe Hard Rock Laboratory and an empirical, mechanical classification of data from KSH01A and at outcrops. A first model of thermal properties of the rock has been developed largely based on data from Aespoe Hard Rock Laboratory, and projections based on density and mineral content. Overall the rock at Simpevarp is characterised by a low thermal conductivity. A consequence of the planned delay in parts of the geological model is that the hydrogeological description is based solely on the version 0 regional structural model. The regional flow pattern is found to be governed by the geometry of the interpreted deformation zones in relation to the acting hydraulic gradient. Hydrogeological simulations of the groundwater evolution since the last glaciation were compared with the developed hydrogeochemical conceptual model. The conceptual model of the development of post-glacial hydrogeochemistry was updated. Also, the salinity distribution, mixing processes and the major reactions altering the groundwater composition were described down to a depth of 300 m. A first model of the transport properties of the rock was presented, although still rather immature due to lack of site-specific data in support of the model. For the near-surface, the Simpevarp subarea is characterised by a large portion of outcrop rock. There is information regarding the distribution of Quaternary deposits, and some information about the stratigraphy of the till, the latter found to be of small thickness, generally 1-3 m

  9. Single-shell tank closure work plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  10. Single-shell tank closure work plan. Revision A

    International Nuclear Information System (INIS)

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs

  11. The transportation operations system: A description

    International Nuclear Information System (INIS)

    Best, R.E.; Danese, F.L.; Dixon, L.D.; Peterson, R.W.; Pope, R.B.

    1990-01-01

    This paper presents a description of the system for transporting radioactive waste that may be deployed to accomplish the assigned system mission, which includes accepting spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from waste generator sites and transporting them to the FWMS destination facilities. The system description presented here contains, in part, irradiated fuel and waste casks, ancillary equipments, truck, rail, and barge transporters, cask and vehicle traffic management organizations, maintenance facilities, and other operations elements. The description is for a fully implemented system, which is not expected to be achieved, however, until several years after initial operations. 6 figs

  12. Preliminary site description. Simpevarp area - version 1.1

    International Nuclear Information System (INIS)

    Winberg, Anders

    2004-08-01

    resolution. The lithology model includes four interpreted rock domains. The deformation zone model includes 14 zones of interpreted high confidence (of existence). A discrete fracture network model has also been developed where attempts are made to assess effects on fracturing imposed by interpreted deformation zones. Furthermore, the validity of extrapolating surface fracture statistics to larger depths was explored. The rock mechanics strength model is based on information from the Aespoe Hard Rock Laboratory and an empirical, mechanical classification of data from KSH01A and at outcrops. A first model of thermal properties of the rock has been developed largely based on data from Aespoe Hard Rock Laboratory, and projections based on density and mineral content. Overall the rock at Simpevarp is characterised by a low thermal conductivity. A consequence of the planned delay in parts of the geological model is that the hydrogeological description is based solely on the version 0 regional structural model. The regional flow pattern is found to be governed by the geometry of the interpreted deformation zones in relation to the acting hydraulic gradient. Hydrogeological simulations of the groundwater evolution since the last glaciation were compared with the developed hydrogeochemical conceptual model. The conceptual model of the development of post-glacial hydrogeochemistry was updated. Also, the salinity distribution, mixing processes and the major reactions altering the groundwater composition were described down to a depth of 300 m. A first model of the transport properties of the rock was presented, although still rather immature due to lack of site-specific data in support of the model. For the near-surface, the Simpevarp subarea is characterised by a large portion of outcrop rock. There is information regarding the distribution of Quaternary deposits, and some information about the stratigraphy of the till, the latter found to be of small thickness, generally 1-3 m

  13. Logical Characterisation of Ontology Construction using Fuzzy Description Logics

    DEFF Research Database (Denmark)

    Badie, Farshad; Götzsche, Hans

    had the extension of ontologies with Fuzzy Logic capabilities which plan to make proper backgrounds for ontology driven reasoning and argumentation on vague and imprecise domains. This presentation conceptualises learning from fuzzy classes using the Inductive Logic Programming framework. Then......, employs Description Logics in characterising and analysing fuzzy statements. And finally, provides a conceptual framework describing fuzzy concept learning in ontologies using the Inductive Logic Programming....

  14. Waste Management Systems Requirements and Descriptions (SRD)

    International Nuclear Information System (INIS)

    Conner, C.W.

    1986-01-01

    The Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a system for the management of high-level radioactive waste and spent fuel in accordance with the Nuclear Waste Policy Act of 1982. The Waste Management system requirements and description document is the program-level technical baseline document. The requirements include the functions that must be performed in order to achieve the system mission and performance criteria for those functions. This document covers only the functional requirements of the system; it does not cover programmatic or procedural requirements pertaining to the processes of designing, siting and licensing. The requirements are largely based on the Nuclear Waste Policy Act of 1982, Environmental Protection Agency standards, Nuclear Regulatory Commission regulations, and DOE orders and guidance. However, nothing in this document should be construed as to relieve the DOE or its contractors from their responsibilities to comply with applicable statutes, regulations, and standards. This document also provides a brief description of the system being developed to meet the requirements. In addition to the described ''authorized system,'' a system description is provided for an ''improved-performance system'' which would include a monitored retrievable storage (MRS) facility. In the event that an MRS facility is approved by Congress, the improved-performance system will become the reference system. Neither system description includes Federal Interim Storage (FIS) capabilities. Should the need for FIS be identified, it will be included as an additional system element. The descriptions are focused on the interfaces between the system elements, rather than on the detail of the system elements themselves

  15. A DESCRIPTION OF BUFO PARDALIS TADPOLES (ANURA ...

    African Journals Online (AJOL)

    Tadpoles of Bufo parda/is Hewitt from Kei Road, Cape Province, are described. INTRODUCTION. Although tadpoles of B. pardalis have been included in Van Dijk's (1971) key to the genus Bufa, no adequate description of this taxon has yet been published. Further studies on variability depend upon a complete description ...

  16. Radiological Protection Institute of Ireland Strategic Plan 2011 to 2013

    International Nuclear Information System (INIS)

    2011-06-01

    The RPII's remit is very broad. It includes three main pillars; regulating all uses of ionising radiation; assessing people's exposure to ionising radiation; advising Government and the public on the prevention of unnecessary exposure. This plan builds on the previous Strategic Plan for 2008 to 2012 and sets out clearly the developments we expect over the planning period, the strategic priorities we are commiting to, along with a clear description of how we will address these priorities. Four key strategic priorities and associated objectives have been developed for this period. The key themes underpinning all four strategic priorities are public value, transparency, communication and sustainability. The priorities are; to provide the expertise, technical capability and information essential to the protection of the Irish population and the environment; to regulate the safe and secure use of ionising radiation in Ireland in a sustainable and transparent manner; to work in partnership with others to implement national radiological protection initiatives; to deliver value to the public in everything we do

  17. System Design Description for the TMAD Code

    International Nuclear Information System (INIS)

    Finfrock, S.H.

    1995-01-01

    This document serves as the System Design Description (SDD) for the TMAD Code System, which includes the TMAD code and the LIBMAKR code. The SDD provides a detailed description of the theory behind the code, and the implementation of that theory. It is essential for anyone who is attempting to review or modify the code or who otherwise needs to understand the internal workings of the code. In addition, this document includes, in Appendix A, the System Requirements Specification for the TMAD System

  18. A vegetation description and floristic analyses of the springs on the Kammanassie Mountain, Western Cape

    Directory of Open Access Journals (Sweden)

    G. Cleaver

    2004-12-01

    Full Text Available The Kammanassie Mountain is a declared mountain catchment area and a Cape mountain zebra Equus zebra zebra population is preserved on the mountain. The high number of springs on the mountain not only provides water for the animal species but also contributes to overall ecosystem functioning. Long-term conservation of viable ecosystems requires a broader understanding of the ecological processes involved. It was therefore decided that a classification, description and mapping of the spring vegetation of the Kammanassie Mountain be undertaken. A TWINSPAN classification, refined by Braun-Blanquet procedures, revealed 11 major plant communities that could be related to geological origin. Habitat factors associated with differences in vegetation include topography, soil type and grazing. Descriptions of the plant communities include diagnostic species as well as prominent and less conspicuous species of the tree, shrub and herbaceous layers. The results also indicate a high species richness compared to similar regions and the difference between plant communities of wet and dry springs. This data is important for long-term monitoring of the spring ecosystems as well as for the compilation of management plans.

  19. Site description of the SFR area at Forsmark at completion of the site investigation phase. SDM-PSU Forsmark

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-05-15

    The site descriptive model (SDM) presented in this report is an integrated model for bedrock geology, rock mechanics, bedrock hydrogeology and bedrock hydrogeochemistry of the site investigated in the SFR extension project (PSU). A description of the surface system is also included in the report. However, the surface system is not integrated with the other disciplines as new data regarding the surface system will not be available until after the completion of SDM-PSU. It is noted that SDM-PSU does not include all disciplines handled in SDM-Site Forsmark (SKB 2008b), the focus is to produce a site description that meets the needs of the SFR extension project. The overall objective of the SFR extension project is to have the application for the extension ready by 2013. This report presents an integrated site model incorporating the historic data acquired from the investigations for and construction of the existing SFR facility (1980-1986), as well as from the recent investigations for the planned extension of SFR (2008-2009). It also provides a summary of the abundant underlying data and the discipline-specific models that support the integrated site model. The description relies heavily on background reports concerning detailed data analyses and modelling in the different disciplines. It is noteworthy that the investigations conducted during the SFR extension project were guided by the choice of site prior to the investigations, which was based on the experience gained during the construction of the existing SFR facility.

  20. Site description of the SFR area at Forsmark at completion of the site investigation phase. SDM-PSU Forsmark

    International Nuclear Information System (INIS)

    2013-05-01

    The site descriptive model (SDM) presented in this report is an integrated model for bedrock geology, rock mechanics, bedrock hydrogeology and bedrock hydrogeochemistry of the site investigated in the SFR extension project (PSU). A description of the surface system is also included in the report. However, the surface system is not integrated with the other disciplines as new data regarding the surface system will not be available until after the completion of SDM-PSU. It is noted that SDM-PSU does not include all disciplines handled in SDM-Site Forsmark (SKB 2008b), the focus is to produce a site description that meets the needs of the SFR extension project. The overall objective of the SFR extension project is to have the application for the extension ready by 2013. This report presents an integrated site model incorporating the historic data acquired from the investigations for and construction of the existing SFR facility (1980-1986), as well as from the recent investigations for the planned extension of SFR (2008-2009). It also provides a summary of the abundant underlying data and the discipline-specific models that support the integrated site model. The description relies heavily on background reports concerning detailed data analyses and modelling in the different disciplines. It is noteworthy that the investigations conducted during the SFR extension project were guided by the choice of site prior to the investigations, which was based on the experience gained during the construction of the existing SFR facility

  1. 29 CFR 1952.370 - Description of the plan as initially approved.

    Science.gov (United States)

    2010-07-01

    ... Section 1952.370 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH... designated as responsible for occupational health matters. The plan defines the covered occupational safety and health issues as defined by the Secretary of Labor in 29 CFR 1902.2(c)(1) and all safety and...

  2. 29 CFR 1952.320 - Description of the plan as initially approved.

    Science.gov (United States)

    2010-07-01

    ... of Labor. (2) The plan defines the covered occupational safety and health issues as defined by the... Section 1952.320 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH... existing enabling legislation and the Indiana Occupational Safety and Health Act (IC 1971, 22-8-1.1 et seq...

  3. Analyzing an Integrated Planning Approach Among Planning Scale and Sector A Case Study of Malang City’s Vision as The City of Education

    Directory of Open Access Journals (Sweden)

    Akhmad Amirudin

    2014-04-01

    Full Text Available Integrated planning is more needed by government today because of the complexity of problems and limited resources. Integrated planning can undertake the problems by giving comprehensive solution and provide how much resources are needed to reach the goal. Integrated planning approach is implied to provide better tools to guide actions towards the development of cities, improvement of human conditions, and ultimately a better urbanism. So the research focused on integrated planning in Malang City based on Malang City’s vision, strategic planning, operational planning, budgeting planning in Malang City to achieve Malang City’s vision as the city of Education. In this study, researcher used qualitative method with descriptive research, which is a research process aims to describe the exact nature / something happened and took place on the research conducted. The research purpose is to identify and describe and analyze the process of Malang City Planning Agency integrate other planning scale and sector in developing planning; and to identify, describe and analyze the process of Malang City Planning Agency integrated all stakeholders in Integrated Planning process. This research use descriptive research method. The reason to use descriptive research method in this study because the principle objectives of this study aimed to describe, illustrate in a systematic, factual and accurate statement of the facts and the relationship between phenomenon. Then qualitative method was directed at the individual's background and a holistic (whole. So in this case should not isolate the individual or organization into a variable or hypothesis, but should view it as part of wholeness. The result of this research in the case study of Malang City has shown thatThe case study of Malang City showed that various sectors recognized but did not pay much attention to Malang City’s vision as City of Education in their plans; however, Regional Mid-term Development

  4. 29 CFR 1952.90 - Description of the plan as initially approved.

    Science.gov (United States)

    2010-07-01

    ... definition of occupational safety and health issues expressed in § 1902.2(c)(1) of this chapter. The plan... Section 1952.90 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH... opinion that the amended act will meet the requirements of the Occupational Safety and Health Act of 1970...

  5. Hurricane Sandy science plan: impacts of storm surge, including disturbed estuarine and bay hydrology

    Science.gov (United States)

    Caskie, Sarah A.

    2013-01-01

    Hurricane Sandy devastated some of the most heavily populated eastern coastal areas of the Nation. With a storm surge peaking at more than 19 feet, the powerful landscape-altering destruction of Hurricane Sandy is a stark reminder of why the Nation must become more resilient to coastal hazards. In response to this natural disaster, the U.S. Geological Survey (USGS) received a total of $41.2 million in supplemental appropriations from the Department of the Interior (DOI) to support response, recovery, and rebuilding efforts. These funds support a science plan that will provide critical scientific information necessary to inform management decisions for recovery of coastal communities, and aid in preparation for future natural hazards. This science plan is designed to coordinate continuing USGS activities with stakeholders and other agencies to improve data collection and analysis that will guide recovery and restoration efforts. The science plan is split into five distinct themes: • Coastal topography and bathymetry • Impacts to coastal beaches and barriers

  6. Plan for addressing issues relating to oil shale plant siting

    Energy Technology Data Exchange (ETDEWEB)

    Noridin, J. S.; Donovan, R.; Trudell, L.; Dean, J.; Blevins, A.; Harrington, L. W.; James, R.; Berdan, G.

    1987-09-01

    The Western Research Institute plan for addressing oil shale plant siting methodology calls for identifying the available resources such as oil shale, water, topography and transportation, and human resources. Restrictions on development are addressed: land ownership, land use, water rights, environment, socioeconomics, culture, health and safety, and other institutional restrictions. Descriptions of the technologies for development of oil shale resources are included. The impacts of oil shale development on the environment, socioeconomic structure, water availability, and other conditions are discussed. Finally, the Western Research Institute plan proposes to integrate these topics to develop a flow chart for oil shale plant siting. Western Research Institute has (1) identified relative topics for shale oil plant siting, (2) surveyed both published and unpublished information, and (3) identified data gaps and research needs. 910 refs., 3 figs., 30 tabs.

  7. Emended description of Campylobacter sputorum and revision of its infrasubspecific (biovar) divisions, including C-sputorum biovar paraureolyticus, a urease-producing variant from cattle and humans

    DEFF Research Database (Denmark)

    On, S.L.W.; Atabay, H.I.; Corry, J.E.L.

    1998-01-01

    A polyphasic taxonomic study of 15 bovine and human strains assigned to the catalase-negative, urease-positive campylobacter (CNUPC) group identified these bacteria as a novel, ureolytic biovar of Campylobacter sputorum for which we propose the name C. sputorum bv. paraureolyticus: suitable...... should be revised to include by. sputorum for catalase-negative strains; by. fecalis for catalase-positive strains; and by. paraureolyticus for urease-positive strains. Strains classified previously as by. bubulus should be reclassified as by. sputorum. The species description of C. sputorum is revised...

  8. TD-S-HF single determinantal reaction theory and the description of many-body processes, including fission

    International Nuclear Information System (INIS)

    Griffin, J.J.; Lichtner, P.C.; Dworzecka, M.; Kan, K.K.

    1979-01-01

    The restrictions implied for the time dependent many-body reaction theory by the (TDHF) single determinantal assumption are explored by constructive analysis. A restructured TD-S-HF reaction theory is modelled, not after the initial-value form of the Schroedinger reaction theory, but after the (fully equivalent) S-matrix form, under the conditions that only self-consistent TDHF solutions occur in the theory, every wave function obeys the fundamental statistical interpretation of quantum mechanics, and the theory reduces to the exact Schroedinger theory for exact solutions which are single determinantal. All of these conditions can be accomodated provided that the theory is interpreted on a time-averaged basis, i.e., physical constants of the Schroedinger theory which are time-dependent in the TDHF theory, are interpreted in TD-S-HF in terms of their time averaged values. The resulting reaction theory, although formulated heuristically, prescribes a well defined and unambiguous calculational program which, although somewhat more demanding technically than the conventional initial-value TDHF method, is nevertheless more consonant with first principles, structurally and mechanistically. For its physical predictions do not depend upon the precise location of the distant measuring apparatus, and are in no way influenced by the spurious cross channel correlations which arise whenever the description of many reaction channels is imposed upon one single-determinantal solution. For nuclear structure physics, the TDHF-eigenfunctions provide the first plausible description of exact eigenstates in the time-dependent framework; moreover, they are unencumbered by any restriction to small amplitudes. 14 references

  9. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  10. Governance in regional development planning?

    DEFF Research Database (Denmark)

    Galland, Daniel

    2008-01-01

    The purpose of this paper is to lay part of the groundwork for a new project aimed at exploring governance aspects concerned with regional development planning (RDP) in Denmark. The fundamental objective is to help establish and clarify a number of research questions to delve into the conditions...... and opportunities for anchoring and implementing such RDP. The paper mainly adopts a descriptive approach to portray tentative pathways to explore and discuss regional governance structures, procedures and practices that are being developed in establishing new RDP processes, strategies and plans....

  11. Software test plan/description/report (STP/STD/STR) for the enhanced logistics intratheater support tool (ELIST) global data segment. Version 8.1.0.0, Database Instance Segment Version 8.1.0.0, ...[elided] and Reference Data Segment Version 8.1.0.0 for Solaris 7; TOPICAL

    International Nuclear Information System (INIS)

    Dritz, K.; Absil-Mills, M.; Jacobs, K.

    2002-01-01

    This document is the Software Test Plan/Description/Report (STP/STD/STR) for the DII COE Enhanced Logistics Intratheater Support Tool (ELIST) mission application. It combines in one document the information normally presented separately in a Software Test Plan, a Software Test Description, and a Software Test Report; it also presents this information in one place for all the segments of the ELIST mission application. The primary purpose of this document is to show that ELIST has been tested by the developer and found, by that testing, to install, deinstall, and work properly. The information presented here is detailed enough to allow the reader to repeat the testing independently. The remainder of this document is organized as follows. Section 1.1 identifies the ELIST mission application. Section 2 is the list of all documents referenced in this document. Section 3, the Software Test Plan, outlines the testing methodology and scope-the latter by way of a concise summary of the tests performed. Section 4 presents detailed descriptions of the tests, along with the expected and observed results; that section therefore combines the information normally found in a Software Test Description and a Software Test Report. The remaining small sections present supplementary information. Throughout this document, the phrase ELIST IP refers to the Installation Procedures (IP) for the Enhanced Logistics Intratheater Support Tool (ELIST) Global Data Segment, Database Instance Segment, Database Fill Segment, Database Segment, Database Utility Segment, Software Segment, and Reference Data Segment

  12. Plutonium finishing plant dangerous waste training plan

    International Nuclear Information System (INIS)

    ENTROP, G.E.

    1999-01-01

    This training plan describes general requirements, worker categories, and provides course descriptions for operation of the Plutonium Finish Plant (PFP) waste generation facilities, permitted treatment, storage and disposal (TSD) units, and the 90-Day Accumulation Areas

  13. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  14. Sandia National Laboratories Institutional Plan: FY 1999-2004

    Energy Technology Data Exchange (ETDEWEB)

    Garber, D.P.

    1999-01-06

    This Institutional Plan is the most comprehensive yearly "snapshot" available of Sandia National Laboratories' major programs, facilities, human resources, and budget. The document also includes overviews of our missions, organization, capabilities, planning functions, milestones, and accomplishments. The document's purpose is to provide the above information to the US Department of Energy, key congressional committees, Sandia management, and other present and potential customers. Chapter 2 presents information about Sandia's mission and summarizes our recent revision of Sandia's Strategic Plan. Chapter 3 presents an overview of Sandia's strategic objectives, chapter 4 lists laboratory goals and milestones for FY 1999, and chapter 5 presents our accomplishments during FY 1998. Chapters 3 through 5 are organized around our eight strategic objectives. The four primary objectives cover nuclear weapons responsibilities, nonproliferation and materials control, energy and critical infrastructures, and emerging national security threats. The major programmatic initiatives are presented in chapter 7. However, the programmatic descriptions in chapter 6 and the Associated funding tables in chapter 9 continue to be presented by DOE Budget and Reporting Code, as in previous Sandia institutional plans. As an aid to the reader, the four primary strategic objectives in chapter 3 are cross-referenced to the program information in chapter 6.

  15. High Luminosity LHC Project Description

    CERN Document Server

    Apollinari, Giorgio; Rossi, Lucio

    2014-01-01

    The High Luminosity LHC (HL-LHC) is a novel configuration of the Large Hadron Collider, aiming at increasing the luminosity by a factor five or more above the nominal LHC design, to allow increasing the integrated luminosity, in the high luminosity experiments ATLAS and CMS, from the 300 fb-1 of the LHC original design up to 3000 fb-1 or more. This paper contains a short description of the main machine parameters and of the main equipment that need to be developed and installed. The preliminary cost evaluation and the time plan are presented, too. Finally, the international collaboration that is supporting the project, the governance and the project structure are discussed, too.

  16. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  17. Computerized radiation treatment planning

    International Nuclear Information System (INIS)

    Laarse, R. van der.

    1981-01-01

    Following a general introduction, a chain consisting of three computer programs which has been developed for treatment planning of external beam radiotherapy without manual intervention is described. New score functions used for determination of optimal incidence directions are presented and the calculation of the position of the isocentre for each optimum combination of incidence directions is explained. A description of how a set of applicators, covering fields with dimensions of 4 to 20 cm, for the 6 to 20 MeV electron beams of a MEL SL75-20 linear accelerator was developed, is given. A computer program for three dimensional electron beam treatment planning is presented. A microprocessor based treatment planning system for the Selectron remote controlled afterloading system for intracavitary radiotherapy is described. The main differences in treatment planning procedures for external beam therapy with neutrons instead of photons is discussed. A microprocessor based densitometer for plotting isodensity lines in film dosimetry is described. A computer program for dose planning of brachytherapy is presented. Finally a general discussion about the different aspects of computerized treatment planning as presented in this thesis is given. (Auth.)

  18. Site scientific mission plan for the Southern Great Plains CART site: July--December 1997

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1997-07-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on July 1, 1997, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  19. Menumbuhkan Minat Kewirausahaan melalui Pembuatan Business Plan

    OpenAIRE

    Suhermini, Suhermini; Safitri, Teti Anggita

    2010-01-01

    The purposes of this research are to generate the interest in entrepreneurship, to improve the motivation to learn entrepreneurship, and to familiarize the students in creating a business plan as a student creativity in developing the character of entrepreneur. The research methods were descriptive analysis with the percentage was 74% and correlation analysis which was used to find out whether any relationship between students' interest in entrepreneurship and creating business plan for Manag...

  20. Test plan for FY-91 dust control studies

    International Nuclear Information System (INIS)

    Winberg, M.R.

    1991-03-01

    This test plan defines basic test procedures for testing commercially available vendor products as soil fixatives and dust suppression agents to determine their capability to control fugitive dust generation during transuranic waste retrieval and handling operations. A description of the test apparatus and methods are provided in this test plan. This test plan defines the sampling procedures, controls, and analytical methods for the samples collected. Data management is discussed, as well as quality assurance and safety requirements for the study. 6 refs., 5 figs

  1. 40 CFR 239.4 - Narrative description of state permit program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Narrative description of state permit program. 239.4 Section 239.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... Narrative description of state permit program. The description of a state's program must include: (a) An...

  2. Socioeconomic monitoring and mitigation plan for the Salt Repository Project Site, Deaf Smith County, Texas: Revision 5: Draft

    International Nuclear Information System (INIS)

    1988-03-01

    The purpose of the Socioeconomic Monitoring and Mitigation Plan (SMMP) is to identify, in consultation with the affected States and Indian Tribes, potentially significant adverse socioeconomic impacts that could result from site characterization activities, to describe approaches that will be used to monitor any such identified impacts, and to describe procedures for mitigating them. Chapter 3 of the SMMP provides a description of site characterization phase activities planned to assess the geologic condition of the site and construction the exploratory shafts and surface support facilities. The rationale for developing socioeconomic monitoring studies is presented in Chapter 4. Chapter 5 contains descriptions of the socioeconomic monitoring and mitigation procedures whenever they are applicable. Additionally, in Chapter 6, the SMMP includes a procedure for modifying the monitoring and mitigation program and an approach for reporting monitoring results to interested parties. 8 refs., 20 figs., 4 tabs

  3. Recertification Project Plan

    International Nuclear Information System (INIS)

    2001-01-01

    The Waste Isolation Pilot Plant's (WIPP) Recertification Project was established to meet the requirement placed in the WIPP Land Withdrawal Act (LWA) to demonstrate WIPP's continued compliance with the Environmental Protection Agency's (EPA) disposal regulations at five-year intervals. This plan delineates the end goal of the effort, sets out interim goals, and offers up guiding assumptions. In general, it sets the overall direction for a highly complex and interdependent set of tasks leading to recertification of the repository in the spring of 2004. In addition, this plan establishes the institutional roles and responsibilities of WIPP project participants in the recertification effort and lays out a high-level schedule for producing the Compliance Recertification Application (CRA). Detailed plans from each organization supporting this project have been included with this document as attachments. Each participant plan provides significantly more detail with descriptions of activities that are designed to ensure a successful outcome. Woven throughout this plan are the elements of guidance and direction gained from technical exchanges with EPA managers and staff. An important principle on which this plan is built is that the process of recertification will not involve modification to the certification baseline, nor will it involve rule making of any kind. Only changes previously approved by the EPA will be detailed in the CRA. EPA-approved changes to the WIPP certification will be accepted through modification or will be approved through the annual change reporting process. For any compliance areas that have not changed since the submission of the Compliance Certification Application(CCA), these will merely be incorporated in the CRA by reference. The CRA will cover all information since the October 1996 submittal of the CCA. A second major principle on which this plan is built stems from the EPA WIPP Recertification Guidance. That guidance makes it clear that, if

  4. Description, prescription and the choice of discount rates

    International Nuclear Information System (INIS)

    Baum, Seth D.

    2009-01-01

    The choice of discount rates is a key issue in the analysis of long-term societal issues, in particular environmental issues such as climate change. Approaches to choosing discount rates are generally placed into two categories: the descriptive approach and the prescriptive approach. The descriptive approach is often justified on grounds that it uses a description of how society discounts instead of having analysts impose their own discounting views on society. This paper analyzes the common forms of the descriptive and prescriptive approaches and finds that, in contrast with customary thinking, both forms are equally descriptive and prescriptive. The prescriptions concern who has standing (i.e. who is included) in society, how the views of these individuals are measured, and how the measurements are aggregated. Such prescriptions are necessary to choose from among the many possible descriptions of how society discounts. The descriptions are the measurements made given a choice of measurement technique. Thus, the labels 'descriptive approach' and 'prescriptive approach' are deeply misleading, as analysts cannot avoid imposing their own views on society. (author)

  5. Supply disruption cost for power network planning

    International Nuclear Information System (INIS)

    Kjoelle, G.H.

    1992-09-01

    A description is given of the method of approach to calculate the total annual socio-economic cost of power supply disruption and non-supplied energy, included the utilities' cost for planning. The total socio-economic supply disruption cost is the sum of the customers' disruption cost and the utilities' cost for failure and disruption. The mean weighted disruption cost for Norway for one hour disruption is NOK 19 per kWh. The customers' annual disruption cost is calculated with basis in the specific disruption cost referred to heavy load (January) and dimensioning maximum loads. The loads are reduced by factors taking into account the time variations of the failure frequency, duration, the loads and the disruption cost. 6 refs

  6. Facility effluent monitoring plan for the 325 Facility

    International Nuclear Information System (INIS)

    1998-01-01

    The Applied Chemistry Laboratory (325 Facility) houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and mixed hazardous waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials, and a waste treatment facility for processing hazardous, mixed, low-level, and transuranic wastes generated by Pacific Northwest Laboratory. Radioactive material storage and usage occur throughout the facility and include a large number of isotopes. This material is in several forms, including solid, liquid, particulate, and gas. Some of these materials are also heated during testing which can produce vapors. The research activities have been assigned to the following activity designations: High-Level Hot Cell, Hazardous Waste Treatment Unit, Waste Form Development, Special Testing Projects, Chemical Process Development, Analytical Hot Cell, and Analytical Chemistry. The following summarizes the airborne and liquid effluents and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements

  7. 42 CFR 423.128 - Dissemination of Part D plan information.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Dissemination of Part D plan information. 423.128... Protections § 423.128 Dissemination of Part D plan information. (a) Detailed description. A Part D sponsor must disclose the information specified in paragraph (b) of this section in the manner specified by CMS...

  8. Testing the methodology for site descriptive modelling. Application for the Laxemar area

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Johan [JA Streamflow AB, Aelvsjoe (Sweden); Berglund, Johan [SwedPower AB, Stockholm (Sweden); Follin, Sven [SF Geologic AB, Stockholm (Sweden); Hakami, Eva [Itasca Geomekanik AB, Stockholm (Sweden); Halvarson, Jan [Swedish Nuclear Fuel and Waste Management Co, Stockholm (Sweden); Hermanson, Jan [Golder Associates AB, Stockholm (Sweden); Laaksoharju, Marcus [Geopoint (Sweden); Rhen, Ingvar [Sweco VBB/VIAK, Stockholm (Sweden); Wahlgren, C.H. [Sveriges Geologiska Undersoekning, Uppsala (Sweden)

    2002-08-01

    A special project has been conducted where the currently available data from the Laxemar area, which is part of the Simpevarp site, have been evaluated and interpreted into a Site Descriptive Model covering: geology, hydrogeology, hydrogeochemistry and rock mechanics. Description of the surface ecosystem has been omitted, since it was re-characterised in another, parallel, project. Furthermore, there has been no evaluation of transport properties. The project is primarily a methodology test. The lessons learnt will be implemented in the Site Descriptive Modelling during the coming site investigation. The intent of the project has been to explore whether available methodology for Site Descriptive Modelling based on surface and borehole data is adequate and to identify potential needs for development and improvement in the methodology. The project has developed, with limitations in scope, a Site Descriptive Model in local scale, corresponding to the situation after completion of the Initial Site Investigations for the Laxemar area (i.e. 'version 1.2' using the vocabulary of the general execution program for the site investigations). The Site Descriptive Model should be reasonable, but should not be regarded as a 'real' model. There are limitations both in input data and in the scope of the analysis. The measured (primary) data constitute a wide range of different measurement results including data from two deep core drilled boreholes. These data both need to be checked for consistency and to be interpreted into a format more amenable for three-dimensional modelling. Examples of such evaluations are estimation of surface geology, lineament interpretation, geological single hole interpretation, hydrogeological single hole interpretation and assessment of hydrogeochemical data. Furthermore, while cross discipline interpretation is encouraged there is also a need for transparency. This means that the evaluations first are made within each discipline

  9. Fusion reactor materials program plan. Section III. Plasma material interaction

    International Nuclear Information System (INIS)

    1978-07-01

    A discussion of materials-related problems and an analysis of such problems is given for each major topical area. The strategy that will be used to solve the materials problems is described. As part of this program strategy, a series of major milestones is identified that extends over the next 20 years. Detailed task descriptions for the next five years leading to the achievement of the major milestones are given. Each task is described on a separate page (or task sheet) which includes the task number, task title, objective, scope, and the major milestones addressed by the task. Secondary milestones within a given task or subtask are defined, together with a priority assignment and an estimate of man-years to accomplish the work. Each Plan is organized along major topics which parallel the Subtask organization of the Task Group responsible for the Plan

  10. Task Analysis and Descriptions of Required Job Competencies for Robotics/Automated Systems Technicians. Final Report. Volume 2. Curriculum Planning Guide.

    Science.gov (United States)

    Hull, Daniel M.; Lovett, James E.

    This volume of the final report for the Robotics/Automated Systems Technician (RAST) curriculum project is a curriculum planning guide intended for school administrators, faculty, and student counselors/advisors. It includes step-by-step procedures to help institutions evaluate their community's needs and their capabilities to meet these needs in…

  11. EHV AC undergrounding electrical power performance and planning

    CERN Document Server

    Benato, Roberto

    2014-01-01

    Analytical methods of cable performance in EHV AC electrical power are discussed in this comprehensive reference. Descriptions of energization, power quality, cable safety constraints and more, guide readers in cable planning and power network operations.

  12. Computer image analysis of seed shape and seed color for flax cultivar description

    Czech Academy of Sciences Publication Activity Database

    Wiesnerová, Dana; Wiesner, Ivo

    2008-01-01

    Roč. 61, č. 2 (2008), s. 126-135 ISSN 0168-1699 R&D Projects: GA ČR GA521/03/0019 Institutional research plan: CEZ:AV0Z50510513 Keywords : image analysis * cultivar description * flax Subject RIV: EA - Cell Biology Impact factor: 1.273, year: 2008

  13. Reasons for using traditional methods and role of nurses in family planning.

    Science.gov (United States)

    Yurdakul, Mine; Vural, Gülsen

    2002-05-01

    The withdrawal method and other traditional methods of contraception are still used in Turkey. Ninety-eight percent of women in Turkey know about modern family planning methods and where to find contraceptives. In fact, only one in every three women uses an effective method. The aim of this descriptive and experimental study was to investigate reasons for using traditional methods and the role of nurses in family planning. The women included in the sample were visited in their homes by nurses and educated for family planning in four sessions. Overall, 53.3% of women were using an effective method. However, 54.3% of women living in the Sirintepe district and 41.6% of women living in the Yenikent district were still using the traditional methods they used before. After the education sessions, the most widely used method was found to be intrauterine device (22.8%) in Sirintepe and condom (25%) in Yenikent. There was a significant difference in family planning methods between these two districts (p < 0.001).

  14. Ten years of health workforce planning in the Netherlands: a tentative evaluation of GP planning as an example.

    NARCIS (Netherlands)

    Greuningen, M. van; Batenburg, R.S.; Velden, L.F.J. van der

    2012-01-01

    INTRODUCTION: In many countries, health-care labour markets are constantly being challenged by an alternation of shortage and oversupply. Avoiding these cyclic variations is a major challenge. In the Netherlands, a workforce planning model has been used in health care for ten years. Case description

  15. Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, Carl J. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

  16. The Radioactive Ion Beams in Brazil (RIBRAS) facility. Description, program, main results, future plans

    Science.gov (United States)

    Lépine-Szily, A.; Lichtenthäler, R.; Guimarães, V.

    2014-08-01

    RIBRAS (Radioactive Ion Beams in Brazil) is a facility installed at the Institute of Physics of the University of São Paulo (IFUSP), Brazil. The RIBRAS system consists of two superconducting solenoids and uses the "in-flight method" to produce radioactive ion beams using the primary beam provided by the 8UD Pelletron Tandem of IFUSP. The ion beams produced so far by RIBRAS are 6He, 8Li, 7Be, 10Be, 8B, 12B with intensities that can vary from 104 to 106 pps. Initially the experimental program covered the study of elastic and inelastic scattering with the objective to study the interaction potential and the reaction mechanisms between weakly bound (RIB) and halo (6He and 8B projectiles on light, medium and heavy mass targets. With highly purified beams, the study of resonant elastic scattering and resonant transfer reactions, using inverse kinematics and thick targets, has also been included in our experimental program. Also, transfer reactions of astrophysical interest and fusion reactions induced by halo nuclei are part of the near-future research program. Our recent results on elastic scattering, alpha-particle production and total reaction cross sections, as well as the resonant elastic and transfer reactions, are presented. Our plans for the near future are related to the installation of a new beam line and a cave for gamma-ray detection. We intend to place in operation a large area neutron detector available in our laboratory. The long-range plans could be the move of the RIBRAS system to the more energetic beam line of the LINAC post-accelerator (10MeV/nucleon primary beams) still in construction in our laboratory.

  17. Setting healthcare priorities: a description and evaluation of the budgeting and planning process in county hospitals in Kenya.

    Science.gov (United States)

    Barasa, Edwine W; Cleary, Susan; Molyneux, Sassy; English, Mike

    2017-04-01

    This paper describes and evaluates the budgeting and planning processes in public hospitals in Kenya. We used a qualitative case study approach to examine these processes in two hospitals in Kenya. We collected data by in-depth interviews of national level policy makers, hospital managers, and frontline practitioners in the case study hospitals (n = 72), a review of documents, and non-participant observations within the hospitals over a 7 month period. We applied an evaluative framework that considers both consequentialist and proceduralist conditions as important to the quality of priority-setting processes. The budgeting and planning process in the case study hospitals was characterized by lack of alignment, inadequate role clarity and the use of informal priority-setting criteria. With regard to consequentialist conditions, the hospitals incorporated economic criteria by considering the affordability of alternatives, but rarely considered the equity of allocative decisions. In the first hospital, stakeholders were aware of - and somewhat satisfied with - the budgeting and planning process, while in the second hospital they were not. Decision making in both hospitals did not result in reallocation of resources. With regard to proceduralist conditions, the budgeting and planning process in the first hospital was more inclusive and transparent, with the stakeholders more empowered compared to the second hospital. In both hospitals, decisions were not based on evidence, implementation of decisions was poor and the community was not included. There were no mechanisms for appeals or to ensure that the proceduralist conditions were met in both hospitals. Public hospitals in Kenya could improve their budgeting and planning processes by harmonizing these processes, improving role clarity, using explicit priority-setting criteria, and by incorporating both consequentialist (efficiency, equity, stakeholder satisfaction and understanding, shifted priorities

  18. SURF II: Characteristics, facilities, and plans

    International Nuclear Information System (INIS)

    Madden, R.P.; Canfield, R.; Furst, M.; Hamilton, A.; Hughey, L.

    1992-01-01

    This facility report describes the Synchrotron Ultraviolet Radiation Facility (SURF II) operated by the National Institute of Standards and Technology, Gaithersburg, Maryland. SURF II is a 300-MeV electron storage ring which provides well characterized continuum radiation from the far infrared to the soft x-ray region with the critical wavelength at 17.4 nm. Brief descriptions are given of the user facilities, the characteristics of the synchrotron radiation, the main storage ring, the injector system and each of the operating beam lines, and associated instruments. Further description is given of expansion plans for additional beam lines

  19. Hanford Patrol Academy Demolition Sites Closure Plan

    International Nuclear Information System (INIS)

    1992-11-01

    From 1975 to 1991 the Hanford Patrol Academy Demolition Sites (HPADS) were used for demolition events. These demolition events were a form of thermal treatment for spent or abandoned chemical waste. Because the HPADS will no longer be used for this thermal activity, the sites will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 and 40 CFR 270.1. Closure also will satisfy closure requirements of WAC 173-303-680 and for the thermal treatment closure requirements of 40 CFR 265.381. This closure plan presents a description of the HPADS, the history of the waste treated, and the approach that will be followed to close the HPADS. Because dangerous waste does not include the source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of WAC 173-303 or of this closure plan. The information on radionuclides is provided only for general knowledge where appropriate. Only dangerous constituents derived from HPADS operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i). The HPADS are actually two distinct soil closure areas within the Hanford Patrol Academy training area

  20. [School meals: planning, production, distribution, and adequacy].

    Science.gov (United States)

    Issa, Raquel Carvalho; Moraes, Letícia Freitas; Francisco, Raquel Rocha Jabour; dos Santos, Luana Caroline; dos Anjos, Adriana Fernandez Versiani; Pereira, Simone Cardoso Lisboa

    2014-02-01

    To evaluate the planning, production, distribution, and nutritional adequacy of meals served at city schools. This descriptive cross-sectional study was conducted between March 2011 and April 2012 and included a representative sample (n = 42 schools) of extended shift city schools from Belo Horizonte, Minas Gerais, Brazil. Five meals from each school were randomly selected and analyzed by direct weighing. Production indicators and nutritional adequacy were evaluated in contrast to the recommendations of the city food security bureau and the Brazilian National Program of School Meals (PNAE). Seventy-nine percent of the analyzed meals did not meet the recommendations of the city food security bureau. The rate of waste (food left on plates) was acceptable at 4,90%, but the rates of cooked and not served food (7,06%) and counter leftovers (5,30%) were high. Both the city planned meals and the meals served in the schools were nutritionally inadequate in terms of the PNAE, particularly for children aged 11-15 years. There was a relationship between consumption by school staff and the amount of food that was cooked (r = 0.353; P planning, production, and distribution of school meals and of food and nutrition education in order to improve the quality of food and to reduce waste in schools.

  1. Graphic Description: The Mystery of Ibn Khafaja\\'s Success in Description

    Directory of Open Access Journals (Sweden)

    جواد رنجبر

    2009-12-01

    Full Text Available Graphic Description:   The Mystery of Ibn Khafaja's Success in Description    Ali Bagher Taheriniya *  Javad Ranjbar **      Abstract Ibn Khafaja is one of the poets and men of letters in Spain. He is titled to Sanobari of Spain. He is one of the masters of description. Hence, the analysis of successful techniques he has used in the descriptive art could illuminate the way for others. Al-Taswir al-harfi (graphic description is a term which denotes the highest and most detailed poems. On this basis, the best descriptive poem is one which is closer to a painting. He has used some elements called conforming elements of description which contain: imagination, feeling, faculty, and dialogue as well as three other elements: to be inborn in description, enchanting nature and convenient life. This article is going to give an analysis of the reasons for Ibn Khafaja’s success in description and portrait making.   Key words: Ibn Khafaja, poetry, description, portrait   * Associate Professor, Bu Ali Sina University of Hamadan E-mail: bTaheriniya@yahoo.com  ** M.A. in Arabic Language and Literature

  2. Converting Taxonomic Descriptions to New Digital Formats

    Directory of Open Access Journals (Sweden)

    Hong Cui

    2008-01-01

    Full Text Available Abstract.--The majority of taxonomic descriptions is currently in print format. The majority of digital descriptions are in formats such as DOC, HTML, or PDF and for human readers. These formats do not convey rich semantics in taxonomic descriptions for computer-aided process. Newer digital formats such as XML and RDF accommodate semantic annotations that allow computers to process the rich semantics on human's behalf, thus open up opportunities for a wide range of innovative usages of taxonomic descriptions, such as searching in more precise and flexible ways, integrating with gnomic and geographic information, generating taxonomic keys automatically, and text data mining and information visualization etc. This paper discusses the challenges in automated conversion of multiple collections of descriptions to XML format and reports an automated system, MARTT. MARTT is a machine-learning system that makes use of training examples to tag new descriptions into XML format. A number of utilities are implemented as solutions to the challenges. The utilities are used to reduce the effort for training example preparation, to facilitate the creation of a comprehensive schema, and to predict system performance on a new collection of descriptions. The system has been tested with several plant and alga taxonomic publications including Flora of China and Flora of North America.

  3. Employing Picture Description to Assess the Students' Descriptive Paragraph Writing

    Directory of Open Access Journals (Sweden)

    Ida Ayu Mega Cahyani

    2018-03-01

    Full Text Available Writing is considered as an important skill in learning process which is needed to be mastered by the students. However, in teaching learning process at schools or universities, the assessment of writing skill is not becoming the focus of learning process and the assessment is administered inappropriately. In this present study, the researcher undertook the study which dealt with assessing descriptive paragraph writing ability of the students through picture description by employing an ex post facto as the research design. The present study was intended to answer the research problem dealing with the extent of the students’ achievement of descriptive paragraph writing ability which is assessed through picture description. The samples under the study were 40 students determined by means of random sampling technique with lottery system. The data were collected through administering picture description as the research instrument. The obtained data were analyzed by using norm-reference measure of five standard values. The results of the data analysis showed that there were 67.50% samples of the study were successful in writing descriptive paragraph, while there were 32.50% samples were unsuccessful in writing descriptive paragraph which was assessed by administering picture description test

  4. National Energy Board 1992-93 estimates part III expenditure plan

    International Nuclear Information System (INIS)

    1992-01-01

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program's financial performance over the past year. The format and organization of the document should be regarded as transitional. For the most part the document is organized to be consistent with the program structure approved for the National Energy Board. 16 figs

  5. National Energy Board 1992-93 estimates part III expenditure plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program`s financial performance over the past year. The format and organization of the document should be regarded as transitional. For the most part the document is organized to be consistent with the program structure approved for the National Energy Board. 16 figs.

  6. Testing the methodology for site descriptive modelling. Application for the Laxemar area

    International Nuclear Information System (INIS)

    Andersson, Johan; Berglund, Johan; Follin, Sven; Hakami, Eva; Halvarson, Jan; Hermanson, Jan; Laaksoharju, Marcus; Rhen, Ingvar; Wahlgren, C.H.

    2002-08-01

    A special project has been conducted where the currently available data from the Laxemar area, which is part of the Simpevarp site, have been evaluated and interpreted into a Site Descriptive Model covering: geology, hydrogeology, hydrogeochemistry and rock mechanics. Description of the surface ecosystem has been omitted, since it was re-characterised in another, parallel, project. Furthermore, there has been no evaluation of transport properties. The project is primarily a methodology test. The lessons learnt will be implemented in the Site Descriptive Modelling during the coming site investigation. The intent of the project has been to explore whether available methodology for Site Descriptive Modelling based on surface and borehole data is adequate and to identify potential needs for development and improvement in the methodology. The project has developed, with limitations in scope, a Site Descriptive Model in local scale, corresponding to the situation after completion of the Initial Site Investigations for the Laxemar area (i.e. 'version 1.2' using the vocabulary of the general execution program for the site investigations). The Site Descriptive Model should be reasonable, but should not be regarded as a 'real' model. There are limitations both in input data and in the scope of the analysis. The measured (primary) data constitute a wide range of different measurement results including data from two deep core drilled boreholes. These data both need to be checked for consistency and to be interpreted into a format more amenable for three-dimensional modelling. Examples of such evaluations are estimation of surface geology, lineament interpretation, geological single hole interpretation, hydrogeological single hole interpretation and assessment of hydrogeochemical data. Furthermore, while cross discipline interpretation is encouraged there is also a need for transparency. This means that the evaluations first are made within each discipline and after this

  7. Advanced Fuels Campaign Execution Plan

    Energy Technology Data Exchange (ETDEWEB)

    Kemal Pasamehmetoglu

    2010-10-01

    The purpose of the Advanced Fuels Campaign (AFC) Execution Plan is to communicate the structure and management of research, development, and demonstration (RD&D) activities within the Fuel Cycle Research and Development (FCRD) program. Included in this document is an overview of the FCRD program, a description of the difference between revolutionary and evolutionary approaches to nuclear fuel development, the meaning of science-based development of nuclear fuels, and the “Grand Challenge” for the AFC that would, if achieved, provide a transformational technology to the nuclear industry in the form of a high performance, high reliability nuclear fuel system. The activities that will be conducted by the AFC to achieve success towards this grand challenge are described and the goals and milestones over the next 20 to 40 year period of research and development are established.

  8. Advanced Fuels Campaign Execution Plan

    Energy Technology Data Exchange (ETDEWEB)

    Kemal Pasamehmetoglu

    2011-09-01

    The purpose of the Advanced Fuels Campaign (AFC) Execution Plan is to communicate the structure and management of research, development, and demonstration (RD&D) activities within the Fuel Cycle Research and Development (FCRD) program. Included in this document is an overview of the FCRD program, a description of the difference between revolutionary and evolutionary approaches to nuclear fuel development, the meaning of science-based development of nuclear fuels, and the 'Grand Challenge' for the AFC that would, if achieved, provide a transformational technology to the nuclear industry in the form of a high performance, high reliability nuclear fuel system. The activities that will be conducted by the AFC to achieve success towards this grand challenge are described and the goals and milestones over the next 20 to 40 year period of research and development are established.

  9. Genetic Algorithms for the Optimization of Chemical Processes Based on Problem Descriptions

    Czech Academy of Sciences Publication Activity Database

    Holeňa, Martin; Rodemerck, U.; Čukić, T.; Linke, D.; Dingerdissen, U.

    2007-01-01

    Roč. 6, č. 4 (2007), s. 615-621 ISSN 1109-2769 R&D Projects: GA ČR GA201/05/0325 Institutional research plan: CEZ:AV0Z10300504 Keywords : computer applications in chemistry * optimization methods * empirical objective function * genetic algorithms * problem-tailoring * formal description language * program generator Subject RIV: IN - Informatics, Computer Science

  10. A patient group based business planning model for a surgical specialty

    NARCIS (Netherlands)

    Adan, I.J.B.F.; Vissers, J.M.H.; van den Heuvel, M.N.; Wiersema, K.; Vissers, J.M.H.; Beech, R.

    2005-01-01

    In this contribution we present an approach for a business planning model for a surgical specialty, based on modelling of all patient processes as well as of the dynamics involved in planning and managing resources. An important basis of the model is the description of the processes of all patient

  11. Business plan basics for engineers

    DEFF Research Database (Denmark)

    Tanev, Stoyan; Rasmussen, Erik Stavnsager; Riber Hansen, Katrine

    2016-01-01

    This chapter focuses on the nature of business planning activities from an engineering entre-/intra-preneurial perspective. It is therefore not limited to technology start-ups or newly created engineering firms but equally relevant for established firms investing in projects that assemble......-driven business environments which are typical the business playground for engineering professionals, the chapter focuses on describing the two key components of the business planning process: the articulation and the development of a viable business model, and managing the scaling up and the growth...... of the business. The de-scription does not pretend to exhaust the topic and continuously refers to several excellent recent publications that could complement the learning process of young and advanced engi-neering professionals interested in knowing more about the business planning process....

  12. The Importance of Documenting and Including Traditional Wisdom in Community-Based Ecotourism Planning

    Directory of Open Access Journals (Sweden)

    Vesna Đukić

    2017-01-01

    Full Text Available This article accords to the theory of community-based tourism, which represents a concept that respects natural and cultural resources of a particular community and encourages participation of its members in the process of tourist product creation. The article operates in the planning phase and aims to give insights into the process of establishing the groundwork for community-based tourism. The key element is documenting and illustrating everything that could be a part of what is known as “traditional wisdom,” namely, the skills and knowledge of traditional life practices. The methods of case study, content analysis, and observation of the village of Omoljica, Serbia, were used. The positive aspect of this locality is reflected in the existing short-term initiatives of organizations and individuals engaging in preserving traditional practices, but without systematic, long-term planning and management of community-based tourism, these individual efforts to revalue traditional life practices would stay unrecognizable and invisible for visitors and stakeholders. Thus, the main goal of this article is to understand the relation between short-term bottom-up initiatives and long-term top-down strategic planning of specific ecotourism destinations, one that would embrace the traditional ways of rural community life. The contribution of this study, in addition to documenting and illustrating “traditional wisdom” of the specific rural community placed in the protected area which encompasses a particular local social system, will be reflected in the creation of a set of guidelines for sustainable, rural, community-based ecotourism as a soft-driver development of protected areas near big cities of the postsocialist countries.

  13. Emended description of Pasteuria nishizawae.

    Science.gov (United States)

    Noel, Gregory R; Atibalentja, N; Domier, Leslie L

    2005-07-01

    The description of the Gram-positive, obligately parasitic, mycelial and endospore-forming bacterium, Pasteuria nishizawae, is emended to include additional observations on the life cycle, host specificity and endospore morphology. The nucleotide sequence of the 16S rRNA gene is also provided.

  14. Business plan pour une application Smartphone : du concept au lancement

    OpenAIRE

    Vriamont, Gilles

    2015-01-01

    Création d'une application mobile pour Smartphone. Description théorique concernant la rédaction d'un business plan dans une première partie suivi d'une description théorique des caractéristiques des applications mobiles. Dans une seconde partie, analyse de l'industrie des Smartphones et des applications mobiles suivi de la partie pratique et du développement du produit, partant de la description du produit jusqu'à l'analyse des coûts. Master [120] en Ingénieur de gestion, Université catho...

  15. Family planning / sex education / teenage pregnancy.

    Science.gov (United States)

    1993-02-01

    The Alan Guttmacher Institute's State Reproductive Health Monitor provides legislative information on family planning, sex education, and teenage pregnancy. The listing contains information on pending bills; the state, the identifying legislation number, the sponsor, the committee, the date the bill was introduced, a description of the bill, and when available, the bill's status. From January through February, 1993, the bills cover a wide range of regulation and social policy including: appropriations for family planning services; Norplant implants for women receiving AFDC benefits; the requirement that health insurance policies provide coverage for contraception services; the repeal of the sterilization procedure review committee; since a need for such a committee has vanished; requiring hotels, motels, and innkeepers to offer condoms for sale to registered guests; allowing male and female public assistance recipients between ages 18-35 who submit to sterilization operations to be eligible to receive a $2,000 grant; a provision that no more children may be included in the size of the family, for the purpose of determining the amount of AFDC benefits that a family may receive, than at the time that eligibility was determined, and that before a family with 2 or more children can receive AFDC benefits, the woman must consent to and have surgically implanted Norplant or a similar reversible birth control device with a 5-year or longer effectiveness.

  16. Academic dishonesty among nursing students: a descriptive study.

    Science.gov (United States)

    Keçeci, Ayla; Bulduk, Serap; Oruç, Deniz; Çelik, Serpil

    2011-09-01

    This descriptive and cross-sectional study aims to evaluate academic dishonesty among university nursing students in Turkey. The study's sample included 196 students. Two instruments were used for gathering data. The first instrument, a questionnaire, which included some socio-demographic variables (age, class, gender, education, family structure, parents' attitude and educators' attitude) formed the first part. The second part included the Academic Dishonesty Tendency Scale developed by Eminoğlu and Nartgün. The data were analyzed using descriptive statistics and Kruskall Wallis, One-way Anova, t- test and Mann-Whitney U test. It was found that academic dishonesty was at medium-level (2.60-3.39) in nursing students.

  17. MENUMBUHKAN MINAT KEWIRAUSAHAAN MELALUI PEMBUATAN BUSINESS PLAN

    Directory of Open Access Journals (Sweden)

    Suhermini Suhermini

    2016-01-01

    Full Text Available The purposes of this research are to generate the interest in entrepreneurship, to improve the motivation to learn entrepreneurship, and to familiarize the students in creating a business plan as a student creativity in developing the character of entrepreneur. The research methods were descriptive analysis with the percentage was 74% and correlation analysis which was used to find out whether any relationship between students’ interest in entrepreneurship and creating business plan for Management Department Students of Semarang State University. The result showed  that there was a significant relationship between interest in entrepreneurship and creating a business plan with significant value was 0032.

  18. MENUMBUHKAN MINAT KEWIRAUSAHAAN MELALUI PEMBUATAN BUSINESS PLAN

    Directory of Open Access Journals (Sweden)

    Suhermini Suhermini

    2010-12-01

    Full Text Available The purposes of this research are to generate the interest in entrepreneurship, to improve the motivation to learn entrepreneurship, and to familiarize the students in creating a business plan as a student creativity in developing the character of entrepreneur. The research methods were descriptive analysis with the percentage was 74% and correlation analysis which was used to find out whether any relationship between students’ interest in entrepreneurship and creating business plan for Management Department Students of Semarang State University. The result showed  that there was a significant relationship between interest in entrepreneurship and creating a business plan with significant value was 0032.

  19. Distinctiveness and Influence of Subjective Norms, Personal Descriptive and Injunctive Norms, and Societal Descriptive and Injunctive Norms on Behavioral Intent: A Case of Two Behaviors Critical to Organ Donation

    Science.gov (United States)

    Park, Hee Sun; Smith, Sandi W.

    2007-01-01

    The effects of the attitudinal, normative, and perceived behavioral control (PBC) components of the theory of planned behavior and personal- and societal-level descriptive and injunctive norms were investigated with regard to their impact on the intent to enroll on a state organ-donor registry and the intent to engage in family discussion about…

  20. Transmutation Fuel Campaign Description and Status

    International Nuclear Information System (INIS)

    Jon Carmack; Kemal O. Pasamehmetoglu

    2008-01-01

    This report contains a technical summary package in response to a Level 2 milestone in the transmutation fuel campaign (TFC) management work-package calling for input to the Secretarial decision. At present, the form of the Secretarial decision package is not fully defined, and it is not clear exactly what will be required from the TFC as a final input. However, it is anticipated that a series of technical and programmatic documents will need to be provided in support of a wider encompassing document on GNEP technology development activities. The TFC technical leadership team provides this report as initial input to the secretarial decision package which is being developed by the Technical Integration Office (TIO) in support of Secretarial decision. This report contains a summary of the TFC execution plan with a work breakdown structure, high level schedule, major milestones, and summary description of critical activities in support of campaign objectives. Supporting documents referenced in this report but provided under separate cover include: (1) An updated review of the state-of-the art for transmutation fuel development activities considering national as well as international fuel research and development testing activities. (2) A definition of the Technology Readiness Level (TRL) used to systematically define and execute the transmutation fuel development activities

  1. Future plans for HEP computing in the US

    International Nuclear Information System (INIS)

    Ballam, J.

    1985-06-01

    The computing requirements of the US HEP Community are set forth. These will be dominated in the next five years by the pantip (TEV I) and e + e - (SLC and CESR) experiments. The ensuing period will be almost completely driven by the data generated by the superconducting super collider (SSC). Plans for near term computing are presented along with speculations for the SSC. Brief descriptions of accelerator and theoretical physics plans are also presented

  2. Description and Rationale for the Planning, Monitoring, and Implementation (PMI) Model: Rationale.

    Science.gov (United States)

    Cort, H. Russell

    The rationale for the Planning, Monitoring, and Implementation Model (PMI) is the subject of this paper. The Superintendent of the District of Columbia Public Schools requested a model for systematic evaluation of educational programs to determine their effectiveness. The school system's emphasis on objective-referenced instruction and testing,…

  3. Operational report, Formation of the XXVII reactor core, plan of fuel exchange

    International Nuclear Information System (INIS)

    Martinc, R.

    1977-01-01

    Plan for fuel exchange for formation of the reactor core No. XXVII is presented. This report includes: the quantity of 80% enriched fuel which is input in the core, description of the fuel 'transfer' through the core within this fuelling scheme. It covers the review of reactor safety operating with the core No. XXVII related to reactivity change, thermal load of the fuel channels and fuel burnup. These data result from the analysis based on the same correlated calculation method which was applied for planning the first regular fuel exchange with 80% enriched fuel (core No. XXVI configuration), which has been approved in february 1977. Based on the enclosed data and the fuel exchange according to the proposed procedure it is expected that the reactor operation with core No. XXVII configuration will be safe [sr

  4. Environmental monitoring and mitigation plan for site characterization: Revision 1

    International Nuclear Information System (INIS)

    1988-01-01

    The purpose of the EMMP is: to identify, in consultation with the affected states and Indian tribes, potentially significant adverse environmental impacts that could result from site characterization activities, to describe data collection methods that will be used to monitor any such identified impacts, and procedures for mitigating them. Chapter 2 of the EMMP provides an overview of the background and scope of the document. Chapter 3 of the EMMP provides a description of site characterization phase activities planned to assess the geologic condition of the site and construct the exploratory shafts and surface support facilities. The rationale for developing environmental monitoring studies is presented in Chapeter 4. Chapter 5 contains descriptions of the environmental monitoring and mitigation procedures whenever they are applicable. Additionally, in Chapter 6, the EMMP includes a procedure for modifying the monitoring and mitigation program and an approach for reporting monitoring results to interested parties. 21 figs., 10 tabs

  5. Site scientific mission plan for the southern Great Plains CART site, January--June 1998

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1998-01-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. The primary purpose of this site scientific mission plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team, Operations Team, and Instrument Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the Site operator, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  6. Description innovative practices for archives and special collections

    CERN Document Server

    Theimer, Kate

    2014-01-01

    Description: Innovative Practices for Archives and Special Collections explores how archives of different sizes and types can enhance the accessibility of their holdings. The book uses eleven case studies to demonstrate innovative ideas that could be transferred into many other settings. Readers can use these as models, sources of inspiration, or starting points for new discussions. The volume will be useful to those working in archives and special collections as well as other cultural heritage organizations, and provides ideas ranging from those that require long-term planning and coordinatio

  7. Balanced biomedical program plan. Volume X. Fusion analysis for and environmental research

    Energy Technology Data Exchange (ETDEWEB)

    1976-06-01

    In this draft planning document for health and environmental research needs relevant to the development of fusion technology, an attempt is made to integrate input from the participating laboratories on the basis of the King-Muir study categories. The general description covers only those concepts and features that are considered important to an understanding of possible and probable effects of thermonuclear reactors on health and the environment. Appendixes are included which reflect an understanding of three areas of special interest: materials requirements, effects from magnetic fields, and tritium effects.

  8. Balanced biomedical program plan. Volume X. Fusion analysis for and environmental research

    International Nuclear Information System (INIS)

    1976-06-01

    In this draft planning document for health and environmental research needs relevant to the development of fusion technology, an attempt is made to integrate input from the participating laboratories on the basis of the King-Muir study categories. The general description covers only those concepts and features that are considered important to an understanding of possible and probable effects of thermonuclear reactors on health and the environment. Appendixes are included which reflect an understanding of three areas of special interest: materials requirements, effects from magnetic fields, and tritium effects

  9. Idaho National Laboratory Ten-Year Site Plan Project Description Document

    Energy Technology Data Exchange (ETDEWEB)

    Not Listed

    2012-03-01

    This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

  10. Birth plan compliance and its relation to maternal and neonatal outcomes

    Directory of Open Access Journals (Sweden)

    Pedro Hidalgo-Lopezosa

    2017-12-01

    Full Text Available ABSTRACT Objective: to know the degree of fulfillment of the requests that women reflect in their birth plans and to determine their influence on the main obstetric and neonatal outcomes. Method: retrospective, descriptive and analytical study with 178 women with birth plans in third-level hospital. Inclusion criteria: low risk gestation, cephalic presentation, single childbirth, delivered at term. Scheduled and urgent cesareans without labor were excluded. A descriptive and inferential analysis of the variables was performed. Results: the birth plan was mostly fulfilled in only 37% of the women. The group of women whose compliance was low (less than or equal to 50% had a cesarean section rate of 18.8% and their children had worse outcomes in the Apgar test and umbilical cord pH; while in women with high compliance (75% or more, the percentage of cesareans fell to 6.1% and their children had better outcomes. Conclusion: birth plans have a low degree of compliance. The higher the compliance, the better is the maternal and neonatal outcomes. The birth plan can be an effective tool to achieve better outcomes for the mother and her child. Measures are needed to improve its compliance.

  11. First-of-A-Kind Control Room Modernization Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-02-01

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results and documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.

  12. 42 CFR 410.100 - Included services.

    Science.gov (United States)

    2010-10-01

    ... service; however, maintenance therapy itself is not covered as part of these services. (c) Occupational... increase respiratory function, such as graded activity services; these services include physiologic... rehabilitation plan of treatment, including physical therapy services, occupational therapy services, speech...

  13. The care-planning conference: Exploring aspects of person-centred interactions.

    Science.gov (United States)

    Jobe, Ingela; Lindberg, Birgitta; Nordmark, Sofi; Engström, Åsa

    2018-04-01

    The aim of this study was to describe the care-planning conference from the participants' and researchers' perspectives, focusing on exploring aspects of person-centred interactions. A single-instrumental, qualitative case study design was used describing a care-planning conference taking place in the home of an older woman and her daughter. Data collection consisted of observation and digital recording of the care-planning conference and individual interviews with all the participants before and after the conference. Data were analysed in several phases: first, a narrative description followed by a general description and, thereafter, qualitative content analysis. The findings revealed that the care-planning conference conducted had no clear purpose and did not fulfil all parts of the planning process. Three themes emerged related to aspects of person-centred interactions. The theme "expectations meet reality" showed different expectations, and participants could not really connect during the conference. The theme "navigate without a map" revealed health professionals' lack of knowledge about the care-planning process. The theme "lose the forest for the trees" described that the conference was conducted only as part of the health professionals' duties. Management and healthcare professionals cannot automatically assume that they are delivering person-centred care. Healthcare professionals need to be sensitive to the context, use the knowledge and tools available and continuously evaluate and reassess the work carried out.

  14. Distinguishing Features and Similarities Between Descriptive Phenomenological and Qualitative Description Research.

    Science.gov (United States)

    Willis, Danny G; Sullivan-Bolyai, Susan; Knafl, Kathleen; Cohen, Marlene Z

    2016-09-01

    Scholars who research phenomena of concern to the discipline of nursing are challenged with making wise choices about different qualitative research approaches. Ultimately, they want to choose an approach that is best suited to answer their research questions. Such choices are predicated on having made distinctions between qualitative methodology, methods, and analytic frames. In this article, we distinguish two qualitative research approaches widely used for descriptive studies: descriptive phenomenological and qualitative description. Providing a clear basis that highlights the distinguishing features and similarities between descriptive phenomenological and qualitative description research will help students and researchers make more informed choices in deciding upon the most appropriate methodology in qualitative research. We orient the reader to distinguishing features and similarities associated with each approach and the kinds of research questions descriptive phenomenological and qualitative description research address. © The Author(s) 2016.

  15. The Radioactive Ion Beams in Brazil (RIBRAS) facility. Description, program, main results, future plans

    Energy Technology Data Exchange (ETDEWEB)

    Lepine-Szily, A.; Lichtenthaeler, R.; Guimaraes, V. [Instituto de Fisica, Universidade de Sao Paulo (Brazil)

    2014-08-15

    RIBRAS (Radioactive Ion Beams in Brazil) is a facility installed at the Institute of Physics of the University of Sao Paulo (IFUSP), Brazil. The RIBRAS system consists of two superconducting solenoids and uses the ''in-flight method'' to produce radioactive ion beams using the primary beam provided by the 8UD Pelletron Tandem of IFUSP. The ion beams produced so far by RIBRAS are {sup 6}He, {sup 8}Li, {sup 7}Be, {sup 10}Be, {sup 8}B, {sup 12}B with intensities that can vary from 10{sup 4} to 10{sup 6} pps. Initially the experimental program covered the study of elastic and inelastic scattering with the objective to study the interaction potential and the reaction mechanisms between weakly bound (RIB) and halo ({sup 6}He and {sup 8}B) projectiles on light, medium and heavy mass targets. With highly purified beams, the study of resonant elastic scattering and resonant transfer reactions, using inverse kinematics and thick targets, has also been included in our experimental program. Also, transfer reactions of astrophysical interest and fusion reactions induced by halo nuclei are part of the near-future research program. Our recent results on elastic scattering, alpha-particle production and total reaction cross sections, as well as the resonant elastic and transfer reactions, are presented. Our plans for the near future are related to the installation of a new beam line and a cave for gamma-ray detection. We intend to place in operation a large area neutron detector available in our laboratory. The long-range plans could be the move of the RIBRAS system to the more energetic beam line of the LINAC post-accelerator (10MeV/nucleon primary beams) still in construction in our laboratory. (orig.)

  16. Ways of looking ahead: hierarchical planning in language production.

    Science.gov (United States)

    Lee, Eun-Kyung; Brown-Schmidt, Sarah; Watson, Duane G

    2013-12-01

    It is generally assumed that language production proceeds incrementally, with chunks of linguistic structure planned ahead of speech. Extensive research has examined the scope of language production and suggests that the size of planned chunks varies across contexts (Ferreira & Swets, 2002; Wagner & Jescheniak, 2010). By contrast, relatively little is known about the structure of advance planning, specifically whether planning proceeds incrementally according to the surface structure of the utterance, or whether speakers plan according to the hierarchical relationships between utterance elements. In two experiments, we examine the structure and scope of lexical planning in language production using a picture description task. Analyses of speech onset times and word durations show that speakers engage in hierarchical planning such that structurally dependent lexical items are planned together and that hierarchical planning occurs for both direct and indirect dependencies. Copyright © 2013 Elsevier B.V. All rights reserved.

  17. The Strategic Plan of the Nuclear Energy Agency, 1999

    International Nuclear Information System (INIS)

    1999-01-01

    The OECD has been engaged in the past few years in a process of reform to take account of the impact of globalization on its Members' economies, and to allow for proper refocusing of its work, notably on the subject of sustainable development. These developments are having an impact on the Nuclear Energy Agency (NEA). The group on the future role of the NEA delivered its report at the end of January 1998 and one key recommendation is the elaboration of a strategic plan for the Agency. The recommendations made in the report served to stimulate a review of NEA goals, priorities, methods of work and products. This review has taken account of the recommendations in the report. The review served as the basis for this Strategic Plan for the NEA, which has been developed to provide guidance to the Agency in planning its activities and implementing its programmes over a five-year period. The report contains detailed description of the following topics:Mission of NEA: Strategic arenas of work, including sectorial arenas, Data bank, Information and communication; Interactions; Relations with non-member countries; Role of the Steering Committee for Nuclear Energy; Working methods; Resources. (R.P.)

  18. Safety case plan 2008

    International Nuclear Information System (INIS)

    2008-07-01

    changes are introduced to the contents of the report 'portfolio'. The new portfolio includes the following reports: Description of the Disposal System, Process, Formulation of Scenarios (including repository evolution), Models and Data, Analyses of Scenarios, Complementary Considerations and Summary. A key novelty is the Models and Data Report, which links the safety case work to the site characterisation, and to the programme for the repository's technical design and development. The purpose of the report is to improve the data traceability and the transparency of the theoretical basis, and to describe and organise the quality management of data production in an efficient way. The first Models and Data Report will be published in 2009. (orig.)

  19. A Development Curriculum Plan To Achieve a Sequenced Curriculum between High School Courses in Automotive Mechanics and the Mattatuck Community College Automotive Technician Program. Final Report.

    Science.gov (United States)

    Mattatuck Community Coll., Waterbury, CT.

    This document contains a developmental curriculum plan for an articulated curriculum in automotive mechanics for Connecticut's Mattatuck Community College and area high schools. The curriculum guide includes a course description, criteria for evaluation, attendance policy, objectives, a curriculum outline, a three-part automotive technician test,…

  20. Task planning systems with natural language interface

    International Nuclear Information System (INIS)

    Kambayashi, Shaw; Uenaka, Junji

    1989-12-01

    In this report, a natural language analyzer and two different task planning systems are described. In 1988, we have introduced a Japanese language analyzer named CS-PARSER for the input interface of the task planning system in the Human Acts Simulation Program (HASP). For the purpose of a high speed analysis, we have modified a dictionary system of the CS-PARSER by using C language description. It is found that the new dictionary system is very useful for a high speed analysis and an efficient maintenance of the dictionary. For the study of the task planning problem, we have modified a story generating system named Micro TALE-SPIN to generate a story written in Japanese sentences. We have also constructed a planning system with natural language interface by using the CS-PARSER. Task planning processes and related knowledge bases of these systems are explained. A concept design for a new task planning system will be also discussed from evaluations of above mentioned systems. (author)

  1. Facility Effluent Monitoring Plan for the 3720 Building

    Energy Technology Data Exchange (ETDEWEB)

    Shields, K.D.; Ballinger, M.Y.

    1999-04-02

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the Environmental Science Laboratory (3720 Facility) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs'' This FEMP has been prepared for the 3720 Facility primarily because it has a major (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The 3720 Facility provides office and laboratory space for PNNL scientific and engineering staff conducting multidisciplinary research in the areas of materials characterization and testing and waste management. The facility is designed to accommodate the use of radioactive and hazardous materials to conduct these activities. Radioactive material storage and usage occur throughout the facility and include a large number of isotopes. This material is in several forms, including solid, liquid, and dispersible particulate. The facility is in the process of being vacated for shutdown, but is considered a Major Emission Point as of the date of this document approval.

  2. Application of the descriptive function on non-linear electromagnetic phenomena

    International Nuclear Information System (INIS)

    Silva, H.T.

    1982-01-01

    This paper presents the solution of the nonlinear plan wave equation in non-equilibrium dielectric medium. The descriptive function appears as a useful tool to describe the medium response when it is possible to consider intensive electromagnetic response. Despite it has been considered an ideal situation of a limitless nonlinear medium, the results constitute a solid basis to mold more complex processes, such as those which take place in the plasma physics

  3. High performance computing and communications: FY 1997 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A provides a detailed look at HPCC Program activities within each agency.

  4. Brief description of the Wackersdorf Reprocessing Facility

    International Nuclear Information System (INIS)

    1986-01-01

    The DWK is now planning the construction and operation of a facility for the reprocessing of spent fuel elements and the fabrication of mixed-oxide fuel elements which will initially have an average daily throughput of 2 tons (t) of nuclear fuel. The application required by the Atomic Law was submitted to the Bavarian State Ministry for State Development and Environmental Matters on October 28, 1982. According to Par. 3, Section 1, No. 1 of the Atomic Law Procedural Ordinance such an application for permission in accordance with par. 7 AtL must explicitly be accompanied by a safety report which shall make it possible for third parties to make a judgment whether the impacts associated with the facility and its operation could damage their rights. The safety report is intended to present and explain the concept of the facility, the safety-technological design bases, and the operation of the plant, including its operation and safety systems and the impacts and proposed preventive measures. In addition to the detailed presentations in the safety report, Par. 3 of the Atomic Law Procedural Ordinance also requires a brief description of the plant designed for general public understanding, suitable for the design, which will also explain the expected impacts on the general environment and the surrounding area. Hence the brief description presents and explains the following matters: the site; the technology and state of the art for reprocessing of spent nuclear fuel; the structure and function of the proposed facility; safety provisions of the proposed facility and the management of perturbations in operation; the impacts of the facility and its operation on the environment; measures to be taken for dealing with the radioactive wastes; and provisions for ultimate shut-down of the facility

  5. CIEMAT participation in the VI National Plan of Scientific Research, Development and Technological Innovation 2008-2012; Participacion del CIEMAT en el VI Plan Nacional de Investigacion Cientifica, Desarrollo e Innovacion Tecnologica 2008-2012

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez, M. T.; Puertas, M. I.

    2014-02-01

    The participation of CIEMAT in the VI National Plan for Scientific Research, Development and Technological Innovation 2008-2011, that was extended by decision of the Council of Ministers until December 2012, is presented. In the first part of the report presents a complete information about the structure of the Plan, the various Instrumental Lines of Action and subsequent calls for National Programs, that have taken place throughout the development of the Plan since its beginning in 2008 until its closure gives in December 2012. The second part of the report includes the description and analysis of the participation of CIEMAT in the calls of the various National Programs, and the contribution of each of the Departments in the number of projects awarded and the funding obtained. The Total number of funded projects was 292, which meant funding amounting to 101, 5 M Euros. (Author)

  6. An operational information systems architecture for assessing sustainable transportation planning: principles and design.

    Science.gov (United States)

    Borzacchiello, Maria Teresa; Torrieri, Vincenzo; Nijkamp, Peter

    2009-11-01

    This paper offers the description of an integrated information system framework for the assessment of transportation planning and management. After an introductory exposition, in the first part of the paper, a broad overview of international experiences regarding information systems on transportation is given, focusing in particular on the relationship between transportation system's performance monitoring and the decision-making process, and on the importance of this connection in the evaluation and planning process, in Italian and European cases. Next, the methodological design of an information system to support efficient and sustainable transportation planning and management aiming to integrate inputs from several different data sources is presented. The resulting framework deploys modular and integrated databases which include data stemming from different national or regional data banks and which integrate information belonging to different transportation fields. For this reason, it allows public administrations to account for many strategic elements that influence their decisions regarding transportation, both from a systemic and infrastructural point of view.

  7. Performance assessment plans and methods for the Salt Repository Project

    International Nuclear Information System (INIS)

    1984-08-01

    This document presents the preliminary plans and anticipated methods of the Salt Repository Project (SRP) for assessing the postclosure and radiological aspects of preclosure performance of a nuclear waste repository in salt. This plan is intended to be revised on an annual basis. The emphasis in this preliminary effort is on the method of conceptually dividing the system into three subsystems (the very near field, the near field, and the far field) and applying models to analyze the behavior of each subsystem and its individual components. The next revision will contain more detailed plans being developed as part of Site Characterization Plan (SCP) activities. After a brief system description, this plan presents the performance targets which have been established for nuclear waste repositories by regulatory agencies (Chapter 3). The SRP approach to modeling, including sensitivity and uncertainty techniques is then presented (Chapter 4). This is followed by a discussion of scenario analysis (Chapter 5), a presentation of preliminary data needs as anticipated by the SRP (Chapter 6), and a presentation of the SRP approach to postclosure assessment of the very near field, the near field, and the far field (Chapters 7, 8, and 9, respectively). Preclosure radiological assessment is discussed in Chapter 10. Chapter 11 presents the SRP approach to code verification and validation. Finally, the Appendix lists all computer codes anticipated for use in performance assessments. The list of codes will be updated as plans are revised

  8. Ten years of health workforce planning in the Netherlands: a tentative evaluation of GP planning as an example

    Directory of Open Access Journals (Sweden)

    Van Greuningen Malou

    2012-08-01

    Full Text Available Abstract Introduction In many countries, health-care labour markets are constantly being challenged by an alternation of shortage and oversupply. Avoiding these cyclic variations is a major challenge. In the Netherlands, a workforce planning model has been used in health care for ten years. Case description Since 1970, the Dutch government has explored different approaches to determine the inflow in medical schools. In 2000, a simulation model for health workforce planning was developed to estimate the required and available capacity of health professionals in the Netherlands. In this paper, this model is explained, using the Dutch general practitioners as an example. After the different steps in the model are clarified, it is shown how elements can be added to arrive at different versions of the model, or ‘scenarios’. A comparison is made of the results of different scenarios for different years. In addition, the subsequent stakeholder decision-making process is considered. Discussion and evaluation Discussion of this paper shows that workforce planning in the Netherlands is a complex modelling task, which is sensitive to different developments influencing the balance between supply and demand. It seems plausible that workforce planning has resulted in a balance between supply and demand of general practitioners. Still, it remains important that the modelling process is accepted by the different stakeholders. Besides calculating the balance between supply and demand, there needs to be an agreement between the stakeholders to implement the advised training inflow. The Dutch simulation model was evaluated using six criteria to be met by models suitable for policy objectives. This model meets these criteria, as it is a comprehensive and parsimonious model that can include all relevant factors. Conclusion Over the last decade, health workforce planning in the Netherlands has become an accepted instrument for calculating the required supply of

  9. Hanford Emergency Response Plan

    International Nuclear Information System (INIS)

    Wagoner, J.D.

    1994-04-01

    The Hanford Emergency Response Plan for the US Department of Energy (DOE), Richland Operations Office (RL), incorporates into one document an overview of the emergency management program for the Hanford Site. The program has been developed in accordance with DOE orders, and state and federal regulations to protect worker and public health and safety and the environment in the event of an emergency at or affecting the Hanford Site. This plan provides a description of how the Hanford Site will implement the provisions of DOE 5500 series and other applicable Orders in terms of overall policies and concept of operations. It should be used as the basis, along with DOE Orders, for the development of specific contractor and RL implementing procedures

  10. Hanford Emergency Response Plan

    Energy Technology Data Exchange (ETDEWEB)

    Wagoner, J.D.

    1994-04-01

    The Hanford Emergency Response Plan for the US Department of Energy (DOE), Richland Operations Office (RL), incorporates into one document an overview of the emergency management program for the Hanford Site. The program has been developed in accordance with DOE orders, and state and federal regulations to protect worker and public health and safety and the environment in the event of an emergency at or affecting the Hanford Site. This plan provides a description of how the Hanford Site will implement the provisions of DOE 5500 series and other applicable Orders in terms of overall policies and concept of operations. It should be used as the basis, along with DOE Orders, for the development of specific contractor and RL implementing procedures.

  11. Evaluating California local land use plan's environmental impact reports

    International Nuclear Information System (INIS)

    Tang Zhenghong; Bright, Elise; Brody, Samuel

    2009-01-01

    Local land use planning has profound impacts on environmental quality; however, few empirical studies have been conducted to systematically measure local land use plans' environmental assessment quality and to identify the factors influencing it. This paper analyzes the quality of 40 Environmental Impact Reports (EIRs) of local jurisdictions' land use plans in California. A plan evaluation protocol defined by five core components and sixty-three indicators is developed to measure the quality of local land use plans' EIRs. The descriptive results indicate that the local jurisdictions produce relatively good quality on its EIRs, but there is still much room for improvement. There are large variations in the quality of EIRs across local jurisdictions. The regression results further highlight three major factors that can significantly influence local land use plan's EIR quality: number of planners, plan updating ability, and development pressure

  12. Equipment acquisition plans for the SSCL magnet excitation power system

    International Nuclear Information System (INIS)

    Winje, R.

    1993-05-01

    This report gives a brief description of the major electrical technical equipment used in the Superconducting Super Collider accelerators systems and the present laboratory plans for the acquisition of the equipment

  13. SWiFT Software Quality Assurance Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Berg, Jonathan Charles [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-01-01

    This document describes the software development practice areas and processes which contribute to the ability of SWiFT software developers to provide quality software. These processes are designed to satisfy the requirements set forth by the Sandia Software Quality Assurance Program (SSQAP). APPROVALS SWiFT Software Quality Assurance Plan (SAND2016-0765) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Controls Engineer Jonathan Berg (6121) Date CHANGE HISTORY Issue Date Originator(s) Description A 2016/01/27 Jon Berg (06121) Initial release of the SWiFT Software Quality Assurance Plan

  14. Minerals Planning Policies and Supply Practices in Ireland.

    NARCIS (Netherlands)

    Ike, P.; van der Molen, S.D.A.

    Table of Contents: 1 Country background. 2 General description of the mineral industry. 3 National system legislation governing ownership resources. 4 National system governing securing supply of minerals. 5 Land use planning. 6 Evaluation of sustainability of mineral supply. 7 Identification of the

  15. Pension plan participation among married couples.

    Science.gov (United States)

    Dushi, Irena; Iams, Howard M

    2013-01-01

    We present descriptive statistics on pension participation and types of pensions among married couples, using data from the 1996/2008 Panels of the Survey of Income and Program Participation and Social Security administrative records. Previous research has focused on pension coverage by marital status, but has not examined couples as a unit. Because couples usually share income, viewing them as a unit provides a better picture of potential access to income from retirement plans. Our analysis compares 1998 and 2009 data because substantial changes occurred in the pension landscape over this decade that could have influenced the prevalence of different pension plans, although we observe modest changes in participation rates and types of plans over the period. We find that in 20 percent of couples, neither spouse participated in a pension plan; in 10 percent, the wife was the only participant; and in 37 percent, the husband was the only participant.

  16. A Developmental Curriculum Plan To Achieve a Sequenced Curriculum between High School Courses in Food Preparation and the Mattatuck Community College Hospitality/Food Services Program. Final Report.

    Science.gov (United States)

    Mattatuck Community Coll., Waterbury, CT.

    This document contains a developmental curriculum plan for an articulated curriculum in hospitality/food service for Connecticut's Mattatuck Community College and area high schools. The curriculum guide includes a course description, criteria for evaluation, attendance policy, objectives, a curriculum area outline, 17 content area objectives, a…

  17. Waste Isolation Pilot Plant, Land Management Plan

    International Nuclear Information System (INIS)

    1993-01-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives

  18. Waste Isolation Pilot Plant, Land Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  19. Great Ellipse Route Planning Based on Space Vector

    Directory of Open Access Journals (Sweden)

    LIU Wenchao

    2015-07-01

    Full Text Available Aiming at the problem of navigation error caused by unified earth model in great circle route planning using sphere model and modern navigation equipment using ellipsoid mode, a method of great ellipse route planning based on space vector is studied. By using space vector algebra method, the vertex of great ellipse is solved directly, and description of great ellipse based on major-axis vector and minor-axis vector is presented. Then calculation formulas of great ellipse azimuth and distance are deduced using two basic vectors. Finally, algorithms of great ellipse route planning are studied, especially equal distance route planning algorithm based on Newton-Raphson(N-R method. Comparative examples show that the difference of route planning between great circle and great ellipse is significant, using algorithms of great ellipse route planning can eliminate the navigation error caused by the great circle route planning, and effectively improve the accuracy of navigation calculation.

  20. Waste Encapsulation and Storage Facility (WESF) Dangerous Waste Training Plan (DWTP)

    International Nuclear Information System (INIS)

    SIMMONS, F.M.

    1999-01-01

    This training plan describes general requirements, worker categories, and provides course descriptions for operation of the WESF permitted miscellaneous storage units, and the < 90 day accumulation areas

  1. Parental intention to support video game play by children with autism spectrum disorder: an application of the theory of planned behavior.

    Science.gov (United States)

    Finke, Erinn H; Hickerson, Benjamin; McLaughlin, Eileen

    2015-04-01

    The purpose of this study was to determine parental attitudes regarding engagement with video games by their children with autism spectrum disorder (ASD) and whether attitudes vary based on ASD symptom severity. Online survey methodology was used to gather information from parents of children with ASD between the ages of 8 and 12 years. The finalized data set included 152 cases. Descriptive statistics and frequency analyses were used to examine participant demographics and video game play. Descriptive and inferential statistics were used to evaluate questions on the theory of planned behavior. Regression analyses determined the predictive ability of the theory of planned behavior constructs, and t tests provided additional descriptive information about between-group differences. Children with ASD play video games. There are no significant differences in the time, intensity, or types of games played based on severity of ASD symptoms (mild vs. moderate). Parents of children with ASD had positive attitudes about video game play. Parents of children with ASD appear to support video game play. On average, parents indicated video game play was positive for their children with ASD, particularly if they believed the games were having a positive impact on their child's development.

  2. Effects of action planning and coping planning within the theory of planned behaviour

    DEFF Research Database (Denmark)

    Pakpour, Amir H.; Zedi, Isa mohammadi; Chatzisarantis, Nikos

    2011-01-01

    Objective: Patients on dialysis have low physical activity levels. The aim of the study was to examine the validity of action planning and coping planning within the theory of planned behaviour framework, for predicting physical activity behaviour of patients on hemodialysis. Methods: One hundred...... and forty four patients who were undergoing emodialysis were selected from dialysis centers. The mean age of the patients was 56.61 (SD= 11.38) years. The patients completed a questionnaire including variables from the theory of planned behaviour, action planning and coping planning. Physical activity...... was prospectively assessed at 4-weeks with the validated International Physical Activity Questionnaire self-report measure. A hierarchical regression analysis was performed to examine the effects of action planning and coping planning on physical activity behaviour. Results: There was a main effect for coping...

  3. Program description for the qualification of CNEA - Argentina as a supplier of LEU silicide fuel and post-irradiation examinations plan for the first prototype irradiated in Argentina

    International Nuclear Information System (INIS)

    Rugirello, Gabriel; Adelfang, Pablo; Denis, Alicia; Zawerucha, Andres; Marco, Agustin di; Guillaume, Eduardo; Sbaffoni, Monica; Lacoste, Pablo

    1998-01-01

    In this report we present a description of the ongoing and future stages of the program for the qualification of CNEA, Argentina, as a supplier of low enriched uranium silicide fuel elements for research reactor. Particularly we will focus on the characteristics of the future irradiation experiment on a new detachable prototype, the post-irradiation examinations (PIE) plan for the already irradiated prototype PO4 and an overview of the recently implemented PIE facilities and equipment. The program is divided in several steps, some of which have been already completed. It concludes: development of the uranium silicide fissile material, irradiation and PIE of several full-scale prototypes. Important investments have been already carried out in the facilities for the FE production and PIE. (author)

  4. Applying the theory of planned behavior to self-report dental attendance in Norwegian adults through structural equation modelling approach.

    Science.gov (United States)

    Åstrøm, Anne N; Lie, Stein Atle; Gülcan, Ferda

    2018-05-31

    Understanding factors that affect dental attendance behavior helps in constructing effective oral health campaigns. A socio-cognitive model that adequately explains variance in regular dental attendance has yet to be validated among younger adults in Norway. Focusing a representative sample of younger Norwegian adults, this cross-sectional study provided an empirical test of the Theory of Planned Behavior (TPB) augmented with descriptive norm and action planning and estimated direct and indirect effects of attitudes, subjective norms, descriptive norms, perceived behavioral control and action planning on intended and self-reported regular dental attendance. Self-administered questionnaires provided by 2551, 25-35 year olds, randomly selected from the Norwegian national population registry were used to assess socio-demographic factors, dental attendance as well as the constructs of the augmented TPB model (attitudes, subjective norms, descriptive norms, intention, action planning). A two-stage process of structural equation modelling (SEM) was used to test the augmented TPB model. Confirmatory factor analysis, CFA, confirmed the proposed correlated 6-factor measurement model after re-specification. SEM revealed that attitudes, perceived behavioral control, subjective norms and descriptive norms explained intention. The corresponding standardized regression coefficients were respectively (β = 0.70), (β =0.18), (β = - 0.17) and (β =0.11) (p planning and action planning (β =0.19) predicted dental attendance behavior (p behavioral control on behavior through action planning and through intention and action planning, respectively. The final model explained 64 and 41% of the total variance in intention and dental attendance behavior. The findings support the utility of the TPB, the expanded normative component and action planning in predicting younger adults' intended- and self-reported dental attendance. Interventions targeting young adults' dental

  5. Advertising plan of Nordic World Championship in Liberec 2009

    OpenAIRE

    Šikolová, Lenka

    2009-01-01

    This diploma paper will deal with creating a proposal for advertising plan of Nordic World Championship in Liberec 2009 which will describe in detail efficient solution of advertising aimed at selected target group. The paper should provide insight how to proceed planning on advertising of such event. In the paper will be analyzed the aim of the project, target group - selected in advance, appeals of advertising project, medias, advertising mediums, harmonogram and budget. Method: Description...

  6. 300 Area waste acid treatment system closure plan. Revision 1

    International Nuclear Information System (INIS)

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan

  7. 300 Area waste acid treatment system closure plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.

  8. Methods for Cf-252 cervix cancer therapy and treatment planning for GYN malignancies in Lexington

    International Nuclear Information System (INIS)

    Coffey, C.W.; Yoneda, J.; Beach, J.L.; Maruyama, Y.

    1986-01-01

    This paper presents the clinical physics methods and treatment planning techniques used in both the external beam and brachytherapy treatment of GYN malignancies in the Radiotherapy Department of the University of Kentucky Medical Center. Specific description of the departmental implant suite and brachytherapy procedures are included. The optimization of brachytherapy applicator placement, source arrangement, and normal and tumor total dose and dose distributions are presented. Quality assurance protocols for teletherapy and brachytherapy and patient and staff safety procedures with Cf-252 are discussed

  9. Automated and Adaptive Mission Planning for Orbital Express

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel; Koblick, Darin

    2008-01-01

    , causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

  10. Standard Guide for Preparing Waste Management Plans for Decommissioning Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide addresses the development of waste management plans for potential waste streams resulting from decommissioning activities at nuclear facilities, including identifying, categorizing, and handling the waste from generation to final disposal. 1.2 This guide is applicable to potential waste streams anticipated from decommissioning activities of nuclear facilities whose operations were governed by the Nuclear Regulatory Commission (NRC) or Agreement State license, under Department of Energy (DOE) Orders, or Department of Defense (DoD) regulations. 1.3 This guide provides a description of the key elements of waste management plans that if followed will successfully allow for the characterization, packaging, transportation, and off-site treatment or disposal, or both, of conventional, hazardous, and radioactive waste streams. 1.4 This guide does not address the on-site treatment, long term storage, or on-site disposal of these potential waste streams. 1.5 This standard does not purport to address ...

  11. How consistent is teachers’ planning, implementation, and assessment in character education?

    Directory of Open Access Journals (Sweden)

    Luh Gd Rahayu Budiarta

    2018-01-01

    Full Text Available This descriptive case study aims at investigating how teachers planned, practiced, assessed students’ character development in the classroom. The study involved 29 students of Grade 5, a classroom, and an English teacher. The instruments include classroom observation, checklist, interview guide, field note, and video recording. The obtained data were analyzed by using analysis method by Miles and Huberman (1994. The result of the research shows that there were ten characters values detected in the lesson plans, however, only 55% consistently appeared in the teaching and learning process. Teachers were found to use performance rubrics and diary to keep record on students’ character development. The interview revealed that there was reluctance regarding role of teacher in term of assessing students’ characters. This fact implies that there should be intensive training and workshop for the teachers to improve the quality of the character education practices in elementary schools in Bali.

  12. Olfactory neuroblastoma: the long-term outcome and late toxicity of multimodal therapy including radiotherapy based on treatment planning using computed tomography

    International Nuclear Information System (INIS)

    Mori, Takashi; Onimaru, Rikiya; Onodera, Shunsuke; Tsuchiya, Kazuhiko; Yasuda, Koichi; Hatakeyama, Hiromitsu; Kobayashi, Hiroyuki; Terasaka, Shunsuke; Homma, Akihiro; Shirato, Hiroki

    2015-01-01

    Olfactory neuroblastoma (ONB) is a rare tumor originating from olfactory epithelium. Here we retrospectively analyzed the long-term treatment outcomes and toxicity of radiotherapy for ONB patients for whom computed tomography (CT) and three-dimensional treatment planning was conducted to reappraise the role of radiotherapy in the light of recent advanced technology and chemotherapy. Seventeen patients with ONB treated between July 1992 and June 2013 were included. Three patients were Kadish stage B and 14 were stage C. All patients were treated with radiotherapy with or without surgery or chemotherapy. The radiation dose was distributed from 50 Gy to 66 Gy except for one patient who received 40 Gy preoperatively. The median follow-up time was 95 months (range 8–173 months). The 5-year overall survival (OS) and relapse-free survival (RFS) rates were estimated at 88% and 74%, respectively. Five patients with stage C disease had recurrence with the median time to recurrence of 59 months (range 7–115 months). Late adverse events equal to or above Grade 2 in CTCAE v4.03 were observed in three patients. Multimodal therapy including radiotherapy with precise treatment planning based on CT simulation achieved an excellent local control rate with acceptable toxicity and reasonable overall survival for patients with ONB

  13. A Systematic Review to Uncover a Universal Protocol for Accuracy Assessment of 3-Dimensional Virtually Planned Orthognathic Surgery.

    Science.gov (United States)

    Gaber, Ramy M; Shaheen, Eman; Falter, Bart; Araya, Sebastian; Politis, Constantinus; Swennen, Gwen R J; Jacobs, Reinhilde

    2017-11-01

    The aim of this study was to systematically review methods used for assessing the accuracy of 3-dimensional virtually planned orthognathic surgery in an attempt to reach an objective assessment protocol that could be universally used. A systematic review of the currently available literature, published until September 12, 2016, was conducted using PubMed as the primary search engine. We performed secondary searches using the Cochrane Database, clinical trial registries, Google Scholar, and Embase, as well as a bibliography search. Included articles were required to have stated clearly that 3-dimensional virtual planning was used and accuracy assessment performed, along with validation of the planning and/or assessment method. Descriptive statistics and quality assessment of included articles were performed. The initial search yielded 1,461 studies. Only 7 studies were included in our review. An important variability was found regarding methods used for 1) accuracy assessment of virtually planned orthognathic surgery or 2) validation of the tools used. Included studies were of moderate quality; reviewers' agreement regarding quality was calculated to be 0.5 using the Cohen κ test. On the basis of the findings of this review, it is evident that the literature lacks consensus regarding accuracy assessment. Hence, a protocol is suggested for accuracy assessment of virtually planned orthognathic surgery with the lowest margin of error. Copyright © 2017 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  14. Awareness and use of and barriers to family planning services ...

    African Journals Online (AJOL)

    Methods. In a quantitative descriptive survey, 360 female undergraduate students ... Access to services was good. ... Levels of awareness and utilisation of family planning services are high among female students at the University of Lesotho.

  15. Web service composition: a semantic web and automated planning technique application

    Directory of Open Access Journals (Sweden)

    Jaime Alberto Guzmán Luna

    2008-09-01

    Full Text Available This article proposes applying semantic web and artificial intelligence planning techniques to a web services composition model dealing with problems of ambiguity in web service description and handling incomplete web information. The model uses an OWL-S services and implements a planning technique which handles open world semantics in its reasoning process to resolve these problems. This resulted in a web services composition system incorporating a module for interpreting OWL-S services and converting them into a planning problem in PDDL (a planning module handling incomplete information and an execution service module concurrently interacting with the planner for executing each composition plan service.

  16. Getting help quickly: older people and community worker perspectives of contingency planning for falls management.

    Science.gov (United States)

    Charlton, Kimberly; Murray, Carolyn M; Kumar, Saravana

    2018-01-01

    Older people living in the community need to plan for getting help quickly if they have a fall. In this paper planning for falls is referred to as contingency planning and is not a falls prevention strategy but rather a falls management strategy. This research explored the perspectives of older people and community workers (CWs) about contingency planning for a fall. Using a qualitative descriptive approach, participants were recruited through a community agency that supports older people. In-depth interviews were conducted with seven older people (67-89 years of age) and a focus group was held with seven workers of mixed disciplines from the same agency. Older people who hadn't fallen were included but were assumed to be at risk of falls because they were in receipt of services. Thematic analysis and concept mapping combined the data from the two participant groups. Four themes including preconceptions about planning ahead for falling, a fall changes perception, giving, and receiving advice about contingency plans and what to do about falling. Both CWs and older people agree contingency planning requires understanding of individual identity and circumstances. CWs have limited knowledge about contingency planning and may be directive, informative, or conservative. Implications for Rehabilitation Falls can result in serious consequences for older people. There is an evidence-practice gap as availability of and access to contingency planning does not necessarily mean older people will use it in a falls emergency. Older people prefer community workers to be directive or informative about contingency planning options but they do want choice and control. Increased community workers knowledge of, and collaborative decision-making about, contingency planning may promote patient-centered services and assist in closing the evidence-practice gap.

  17. Planning Framework for Mesolevel Optimization of Urban Runoff Control Schemes

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Qianqian; Blohm, Andrew; Liu, Bo

    2017-04-01

    A planning framework is developed to optimize runoff control schemes at scales relevant for regional planning at an early stage. The framework employs less sophisticated modeling approaches to allow a practical application in developing regions with limited data sources and computing capability. The methodology contains three interrelated modules: (1)the geographic information system (GIS)-based hydrological module, which aims at assessing local hydrological constraints and potential for runoff control according to regional land-use descriptions; (2)the grading module, which is built upon the method of fuzzy comprehensive evaluation. It is used to establish a priority ranking system to assist the allocation of runoff control targets at the subdivision level; and (3)the genetic algorithm-based optimization module, which is included to derive Pareto-based optimal solutions for mesolevel allocation with multiple competing objectives. The optimization approach describes the trade-off between different allocation plans and simultaneously ensures that all allocation schemes satisfy the minimum requirement on runoff control. Our results highlight the importance of considering the mesolevel allocation strategy in addition to measures at macrolevels and microlevels in urban runoff management. (C) 2016 American Society of Civil Engineers.

  18. Karyotype characterization of Mugil incilis Hancock, 1830 (Mugiliformes: Mugilidae, including a description of an unusual co-localization of major and minor ribosomal genes in the family

    Directory of Open Access Journals (Sweden)

    Anne Kathrin Hett

    Full Text Available This study reports the description of the karyotype of Mugil incilis from Venezuela. The chromosome complement is composed of 48 acrocentric chromosomes, which uniformly decrease in size. Therefore, the homologues can not be clearly identified, with the exception of one of the largest chromosome pairs, classified as number 1, whose homologues may show a subcentromeric secondary constriction, and of chromosome pair number 24, which is considerably smaller than the others. C-banding showed heterochromatic blocks at the centromeric/pericentromeric regions of all chromosomes, which were more conspicuous on chromosomes 1, given the C-positive signals include the secondary constrictions. AgNO3 and fluorescent in situ hybridization (FISH with 45S rDNA demonstrated that the nucleolus organizer regions are indeed located on the secondary constrictions of chromosome pair number 1. FISH with 5S rDNA revealed that the minor ribosomal genes are located on this same chromosome pair, near the NORs, though signals are closer to the centromeres and of smaller size, compared to those of the major ribosomal gene clusters. This is the first description of co-localization of major and minor ribosomal genes in the family. Data are discussed from a cytotaxonomic and phylogenetic perspective.

  19. Gen IV Materials Handbook Implementation Plan

    International Nuclear Information System (INIS)

    Rittenhouse, P.; Ren, W.

    2005-01-01

    A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product

  20. Advances in ultrasonic testing of austenitic stainless steel welds. Towards a 3D description of the material including attenuation and optimisation by inversion

    Science.gov (United States)

    Moysan, J.; Gueudré, C.; Ploix, M.-A.; Corneloup, G.; Guy, Ph.; Guerjouma, R. El; Chassignole, B.

    In the case of multi-pass welds, the material is very difficult to describe due to its anisotropic and heterogeneous properties. Anisotropy results from the metal solidification and is correlated with the grain orientation. A precise description of the material is one of the key points to obtain reliable results with wave propagation codes. A first advance is the model MINA which predicts the grain orientations in multi-pass 316-L steel welds. For flat position welding, good predictions of the grains orientations were obtained using 2D modelling. In case of welding in position the resulting grain structure may be 3D oriented. We indicate how the MINA model can be improved for 3D description. A second advance is a good quantification of the attenuation. Precise measurements are obtained using plane waves angular spectrum method together with the computation of the transmission coefficients for triclinic material. With these two first advances, the third one is now possible: developing an inverse method to obtain the material description through ultrasonic measurements at different positions.

  1. Progressive IRP Models for Power Resources Including EPP

    Directory of Open Access Journals (Sweden)

    Yiping Zhu

    2017-01-01

    Full Text Available In the view of optimizing regional power supply and demand, the paper makes effective planning scheduling of supply and demand side resources including energy efficiency power plant (EPP, to achieve the target of benefit, cost, and environmental constraints. In order to highlight the characteristics of different supply and demand resources in economic, environmental, and carbon constraints, three planning models with progressive constraints are constructed. Results of three models by the same example show that the best solutions to different models are different. The planning model including EPP has obvious advantages considering pollutant and carbon emission constraints, which confirms the advantages of low cost and emissions of EPP. The construction of progressive IRP models for power resources considering EPP has a certain reference value for guiding the planning and layout of EPP within other power resources and achieving cost and environmental objectives.

  2. System requirements and design description for the environmental requirements management interface (ERMI)

    International Nuclear Information System (INIS)

    Biebesheimer, E.

    1997-01-01

    This document describes system requirements and the design description for the Environmental Requirements Management Interface (ERMI). The ERMI database assists Tank Farm personnel with scheduling, planning, and documenting procedure compliance, performance verification, and selected corrective action tracking activities for Tank Farm S/RID requirements. The ERMI database was developed by Science Applications International Corporation (SAIC). This document was prepared by SAIC and edited by LMHC

  3. Project plan remove special nuclear material from PFP project plutonium finishing plant

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  4. The nursing human resource planning best practice toolkit: creating a best practice resource for nursing managers.

    Science.gov (United States)

    Vincent, Leslie; Beduz, Mary Agnes

    2010-05-01

    Evidence of acute nursing shortages in urban hospitals has been surfacing since 2000. Further, new graduate nurses account for more than 50% of total nurse turnover in some hospitals and between 35% and 60% of new graduates change workplace during the first year. Critical to organizational success, first line nurse managers must have the knowledge and skills to ensure the accurate projection of nursing resource requirements and to develop proactive recruitment and retention programs that are effective, promote positive nursing socialization, and provide early exposure to the clinical setting. The Nursing Human Resource Planning Best Practice Toolkit project supported the creation of a network of teaching and community hospitals to develop a best practice toolkit in nursing human resource planning targeted at first line nursing managers. The toolkit includes the development of a framework including the conceptual building blocks of planning tools, manager interventions, retention and recruitment and professional practice models. The development of the toolkit involved conducting a review of the literature for best practices in nursing human resource planning, using a mixed method approach to data collection including a survey and extensive interviews of managers and completing a comprehensive scan of human resource practices in the participating organizations. This paper will provide an overview of the process used to develop the toolkit, a description of the toolkit contents and a reflection on the outcomes of the project.

  5. 30 CFR 756.17 - Approval of the Hopi Tribe's abandoned mine land reclamation plan amendments.

    Science.gov (United States)

    2010-07-01

    ... 884.13(f)(2), concerning a description of aesthetic, cultural and recreational conditions of the Hopi... 7, 1995—Purchasing procedures. (c) Revisions to, additions of, or deletions of the following plan... Participation; Section VIII—Organization of the Hopi Tribe; Section XII—Description of Aesthetic, Cultural and...

  6. Strengthening the Role of Part-Time Faculty in Community Colleges. Example Job Description for Part-Time Faculty: Valencia College--Job Description and Essential Competencies

    Science.gov (United States)

    Center for Community College Student Engagement, 2013

    2013-01-01

    In an effort to support college conversations regarding strengthening the role of part-time faculty, this brief document presents the job description for a Valencia College part-time/adjunct professor (revised as of July 19, 2013). The description includes essential functions, qualifications, and knowledge, skills, and abilities. This is followed…

  7. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  8. Licensing systems and inspection of nuclear installations in NEA Member countries. Part 1, Description of licensing systems

    International Nuclear Information System (INIS)

    1977-01-01

    This study provides an assessment of the legislative and regulatory provisions applicable and of the practices followed in the countries concerned and is divided into two separate sections. This document is the first part only. It contains the description of national licensing and inspection systems for nuclear installations in the twenty OECD countries which have specific regulations in this field. Each analysis has been presented following a plan which is as standardised as possible so as to facilitate comparison between the national systems. Part II, which is not included in this document, contains the diagrams illustrating the steps in the licensing procedure and the duties of the bodies involved as well as certain additional documents. It also includes a table showing the sequence of the main steps in the licensing process in the countries covered by this Study

  9. On the perceived usefulness of risk descriptions for decision-making in disaster risk management

    International Nuclear Information System (INIS)

    Lin, Lexin; Nilsson, Anders; Sjölin, Johan; Abrahamsson, Marcus; Tehler, Henrik

    2015-01-01

    Managing risk using an “all-hazards” and “whole of society”-approach involves extensive communication of risk descriptions among many stakeholders. In the present study we investigate how professionals working with disaster risk management in such contexts perceive the usefulness of different descriptions of risk. Empirical data from the Swedish disaster risk management system were used in an attempt to investigate the aspects of a risk description that affect its usefulness (as perceived by professionals). Thirty-three local municipal risk and vulnerability assessments (RVA documents) produced in the region of Scania in 2012 were analyzed in terms of six variables. The documents were then ranked by professionals based on their perceived usefulness for decision-making. Statistical analysis was conducted to identify any possible correlations between the overall ranking of the usefulness of the municipal RVA:s and each of the variables. We conclude that the way the likelihood and consequences of scenarios are described influence the perceived usefulness of a risk description. Furthermore, whether descriptions of scenarios are included in a risk description or not, and whether background information concerning the likelihood of scenarios are included also influence perceived usefulness of risk descriptions. - Highlights: • Written communication of risk between professionals is investigated. • The way likelihood is described influences a risk description's usefulness. • The way consequences are described influence a risk description's usefulness. • Whether background information is included in a risk description influences its usefulness

  10. Minerals Planning Policies and Supply Practices in The Netherlands

    NARCIS (Netherlands)

    Ike, P.

    Table of Contents: 1 Country background. 2 General description of the mineral industry. 3 National system legislation governing ownership resources. 4 National system governing securing supply of minerals. 5 Land use planning. 6 Evaluation of sustainability of mineral supply. 7 Identification of the

  11. Minerals Planning Policies and Supply Practices in Great Britain

    NARCIS (Netherlands)

    Ike, P.; van der Molen, S.D.A.

    Table of Contents: 1 Country background. 2 General description of the mineral industry. 3 National system legislation governing ownership resources. 4 National system governing securing supply of minerals. 5 Land use planning. 6 Evaluation of sustainability of mineral supply. 7 Identification of the

  12. 10 CFR 60.17 - Contents of site characterization plan.

    Science.gov (United States)

    2010-01-01

    ....17 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN... radioactive waste; (iv) Plans to control any adverse impacts from such site characterization activities that...-level radioactive waste to be emplaced in such geologic repository, a description (to the extent...

  13. Ebola Preparedness Planning and Collaboration by Two Health Systems in Wisconsin, September to December 2014.

    Science.gov (United States)

    Leonhardt, Kathryn Kraft; Keuler, Megan; Safdar, Nasia; Hunter, Paul

    2016-08-01

    We describe the collaborative approach used by 2 health systems in Wisconsin to plan and prepare for the threat of Ebola virus disease. This was a descriptive study of the preparedness planning, infection prevention, and collaboration with public health agencies undertaken by 2 health systems in Wisconsin between September and December 2014. The preparedness approach used by the 2 health systems relied successfully on their robust infrastructure for planning and infection prevention. In the setting of rapidly evolving guidance and unprecedented fear regarding Ebola, the 2 health systems enhanced their response through collaboration and coordination with each other and government public health agencies. Key lessons learned included the importance of a rigorous planning process, robust infection prevention practices, and coalitions between public and private health sectors. The potential threat of Ebola virus disease stimulated emergency preparedness in which acute care facilities played a leading role in the public health response. Leveraging the existing expertise of health systems is essential when faced with emerging infectious diseases. (Disaster Med Public Health Preparedness. 2016;10:691-697).

  14. Description logic rules

    CERN Document Server

    Krötzsch, M

    2010-01-01

    Ontological modelling today is applied in many areas of science and technology,including the Semantic Web. The W3C standard OWL defines one of the most important ontology languages based on the semantics of description logics. An alternative is to use rule languages in knowledge modelling, as proposed in the W3C's RIF standard. So far, it has often been unclear how to combine both technologies without sacrificing essential computational properties. This book explains this problem and presents new solutions that have recently been proposed. Extensive introductory chapters provide the necessary

  15. Transportation Institutional Plan

    Energy Technology Data Exchange (ETDEWEB)

    1986-08-01

    This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.

  16. Oak Ridge National Laboratory Environmenal, Safety, and Health Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The 1990 Tiger Team Appraisal of Oak Ridge National Laboratory (ORNL) revealed that neither Martin Marietta Energy Systems, Inc. (Energy Systems) nor ORNL had a strategic plan for Environmental, Safety, and Health (ES ampersand H) activities. There were no detailed plans describing ORNL's mission, objectives, and strategies for ES ampersand H activities. A number of plans do exist that cover various aspects of ES ampersand H. Their scope ranges from multiyear program plans to annual audit schedules to compliance plans to action plans from specific audits. However, there is not a single document that identifies the plans and the objectives they are to address. This document describes the strategic plan for ORNL and provides the linkage among existing plans. It gives a brief description of the organization and management of ES ampersand H activities at ORNL. The plan identifies the general strategies to be taken by ORNL, using the overall guidance from Energy Systems in its corporate ES ampersand H Strategic Plan. It also identifies more detailed plans for implementation of these strategies, where appropriate

  17. Hydrogeochemical site descriptive model - a strategy for the model development during site investigations

    International Nuclear Information System (INIS)

    Smellie, John; Laaksoharju, Marcus; Tullborg, Eva-Lena

    2002-12-01

    In 2002, SKB commenced site characterisation investigations using deep boreholes at different sites. As an integral part of the planning work SKB has prepared a strategy to develop a Hydrogeochemical Site Descriptive Model; similar strategies have been developed for the other major geoscience disciplines. The main objectives of the Hydrogeochemical Site Descriptive Model are to describe the chemistry and distribution of the groundwater in the bedrock and overburden and the hydrogeochemical processes involved in its origin and evolution. This description is based primarily on measurements of the groundwater composition but incorporates the use of available geological and hydrogeological site descriptive models. The SKB hydrogeochemistry programme is planned to fulfil two basic requirements: 1) to provide representative and quality assured data for use as input parameter values in calculating long-term repository safety, and 2) to understand the present undisturbed hydrogeochemical conditions and how these conditions will change in the future. Parameter values for safety analysis include pH, Eh, S, SO 4 , HCO 3 , HPO 4 and TDS (mainly cations), together with colloids, fulvic and humic acids, other organics, bacteria and nitrogen. These values will be used to characterise the groundwater environment at, above and below repository depths. In the hydrogeochemical site investigation programme the number and location of the sampling points will be constrained by: a) geology (e.g. topography, overburden types, bedrock structures etc), b) hydrogeology (e.g. groundwater recharge/discharge areas, residence times), c) reliability (e.g. undisturbed vs disturbed groundwater chemical conditions), and d) resources (e.g. number and type of samples, and also available personnel, may be restricted by budgetary and schedule concerns). Naturally a balance is required between these constraints and the scientific aims of the programme. The constraints should never detrimentally affect

  18. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  19. In Second Year Of Marketplaces, New Entrants, ACA 'Co-Ops,' And Medicaid Plans Restrain Average Premium Growth Rates.

    Science.gov (United States)

    Gabel, Jon R; Whitmore, Heidi; Green, Matthew; Stromberg, Sam T; Weinstein, Daniel S; Oran, Rebecca

    2015-12-01

    Premiums for health insurance plans offered through the federally facilitated and state-based Marketplaces remained steady or increased only modestly from 2014 to 2015. We used data from the Marketplaces, state insurance departments, and insurer websites to examine patterns of premium pricing and the factors behind these patterns. Our data came from 2,964 unique plans offered in 2014 and 4,153 unique plans offered in 2015 in forty-nine states and the District of Columbia. Using descriptive and multivariate analysis, we found that the addition of a carrier in a rating area lowered average premiums for the two lowest-cost silver plans and the lowest-cost bronze plan by 2.2 percent. When all plans in a rating area were included, an additional carrier was associated with an average decline in premiums of 1.4 percent. Plans in the Consumer Operated and Oriented Plan Program and Medicaid managed care plans had lower premiums and average premium increases than national commercial and Blue Cross and Blue Shield plans. On average, premiums fell by an appreciably larger amount for catastrophic and bronze plans than for gold plans, and premiums for platinum plans increased. This trend of low premium increases overall is unlikely to continue, however, as insurers are faced with mounting medical claims. Project HOPE—The People-to-People Health Foundation, Inc.

  20. Characteristics of Consumers of Family Planning Services in Eastern Nepal

    OpenAIRE

    Sushma Dahal; Raj Kumar Subedi

    2013-01-01

    Family planning services in Nepal are provided by government and non-government health facilities. A descriptive cross sectional study was done by secondary data review of eight months from Institutional clinic, District Health Office (DHO) Ilam district. Use of different family planning methods through government health facility was studied in relation to different variables like age, sex, ethnicity, and, number of children. Around 53% of the female users of spacing method and around 47% of ...

  1. 40 CFR 35.3555 - Intended Use Plan (IUP).

    Science.gov (United States)

    2010-07-01

    ... description of the financial planning process undertaken for the Fund and the impact of funding decisions on the long-term financial health of the Fund. (4) Financial status. The IUP must describe the sources... project; the expected terms of financial assistance based on the best information available at the time...

  2. Language and status: On the limits of language planning

    African Journals Online (AJOL)

    Post-1994 language planning: the rise of a new policy discourse. 'Language .... was post-1945 'nation building' (Fishman 1968:54) and the emergence of new nationalist movements ..... professional scholars in Africa played in the production of "'inventory' descriptions of ... appropriate conceptualization of its subject matter.

  3. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  4. Integration of treatment innovation planning and implementation: strategic process models and organizational challenges.

    Science.gov (United States)

    Lehman, Wayne E K; Simpson, D Dwayne; Knight, Danica K; Flynn, Patrick M

    2011-06-01

    Sustained and effective use of evidence-based practices in substance abuse treatment services faces both clinical and contextual challenges. Implementation approaches are reviewed that rely on variations of plan-do-study-act (PDSA) cycles, but most emphasize conceptual identification of core components for system change strategies. A two-phase procedural approach is therefore presented based on the integration of Texas Christian University (TCU) models and related resources for improving treatment process and program change. Phase 1 focuses on the dynamics of clinical services, including stages of client recovery (cross-linked with targeted assessments and interventions), as the foundations for identifying and planning appropriate innovations to improve efficiency and effectiveness. Phase 2 shifts to the operational and organizational dynamics involved in implementing and sustaining innovations (including the stages of training, adoption, implementation, and practice). A comprehensive system of TCU assessments and interventions for client and program-level needs and functioning are summarized as well, with descriptions and guidelines for applications in practical settings. (PsycINFO Database Record (c) 2011 APA, all rights reserved).

  5. A taxonomic revision of the Cymindis (Pinacodera limbata species group (Coleoptera, Carabidae, Lebiini, including description of a new species from Florida, U.S.A.

    Directory of Open Access Journals (Sweden)

    Wesley Hunting

    2013-01-01

    Full Text Available The Cymindis (Pinacodera limbata species group (Coleoptera, Carabidae, Lebiini is a precinctive New World taxon with ranges extended from portions of temperate southeastern Canada and the U.S.A. through the montane regions of Mexico, south to the Isthmus of Tehuantepec. The group is distinguishable from all other members of the subgenus Pinacodera by males possessing a distinctive sclerite (endophallic plate at the apex of the endophallus. In the past, a lack of material and misunderstandings of range of variation within species have contributed to confusion about how many species there really are.This revision of the limbata species group includes a classification, a key to groups within the subgenus Pinacodera and species within the limbata group, descriptions of species, re-rankings and new synonymies. In total 10 taxa are treated, with 6 new synonyms proposed, 1 new combination introduced and 1 new species described: Cymindis (Pinacodera rufostigma (type locality: Archbold Biological Station, Highlands County, Florida, U.S.A.. Each taxon is characterized in terms of structural features of adults, habitat, geographical distribution, and chorological affinities. Available ecological information and treatments of variation are included.

  6. Community development planning

    International Nuclear Information System (INIS)

    Gray, S.I.

    1983-01-01

    The focus of this paper will be methods of local community involvement in the community development planning efforts which will be required at the recommended sites. Community development planning will include capital improvement plans, housing plans, zoning changes, business development plans and other community service and fiscal plans required to meet the projected needs of new residents as a result of the repository construction and operation. This paper will present, (1) the need for community planning, (2) methods of responding to community planning needs, (3) current community planning issues to be addressed. 2 references, 1 figure

  7. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references

  8. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.

  9. 29 CFR 1952.120 - Description of the plan.

    Science.gov (United States)

    2010-07-01

    ... to the mandatory civil penalty for posting violations under OSHA; (4) Letter from John E. Hillier... violations, including informal review; notification of employees of their protections and obligations... violations of standards and abatement requirements; effective sanctions against employers for violations of...

  10. Project plan remove special nuclear material from PFP project plutonium finishing plant; TOPICAL

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617,Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  11. Hydrogeochemical site descriptive model - a strategy for the model development during site investigations

    Energy Technology Data Exchange (ETDEWEB)

    Smellie, John [Conterra AB, Uppsala (Sweden); Laaksoharju, Marcus [GeoPoint AB, Sollentuna (Sweden); Tullborg, Eva-Lena [Terralogica AB, Graabo (Sweden)

    2002-12-01

    In 2002, SKB commenced site characterisation investigations using deep boreholes at different sites. As an integral part of the planning work SKB has prepared a strategy to develop a Hydrogeochemical Site Descriptive Model; similar strategies have been developed for the other major geoscience disciplines. The main objectives of the Hydrogeochemical Site Descriptive Model are to describe the chemistry and distribution of the groundwater in the bedrock and overburden and the hydrogeochemical processes involved in its origin and evolution. This description is based primarily on measurements of the groundwater composition but incorporates the use of available geological and hydrogeological site descriptive models. The SKB hydrogeochemistry programme is planned to fulfil two basic requirements: 1) to provide representative and quality assured data for use as input parameter values in calculating long-term repository safety, and 2) to understand the present undisturbed hydrogeochemical conditions and how these conditions will change in the future. Parameter values for safety analysis include pH, Eh, S, SO{sub 4}, HCO{sub 3}, HPO{sub 4} and TDS (mainly cations), together with colloids, fulvic and humic acids, other organics, bacteria and nitrogen. These values will be used to characterise the groundwater environment at, above and below repository depths. In the hydrogeochemical site investigation programme the number and location of the sampling points will be constrained by: a) geology (e.g. topography, overburden types, bedrock structures etc), b) hydrogeology (e.g. groundwater recharge/discharge areas, residence times), c) reliability (e.g. undisturbed vs disturbed groundwater chemical conditions), and d) resources (e.g. number and type of samples, and also available personnel, may be restricted by budgetary and schedule concerns). Naturally a balance is required between these constraints and the scientific aims of the programme. The constraints should never

  12. D7.1 Quality Plan

    DEFF Research Database (Denmark)

    Ryberg, Thomas; Lee, Deirdre; Maglavera, Stavroula

    2009-01-01

    This deliverable includes a detailed description of the quality assurance process for the EATrain2 project, the initial results of the risk assessment and self-evaluation processes as well as a description of the peer-review process for ensuring qualitative deliverables....

  13. Descriptive business intelligence analysis: utting edge strategic asset for SMEs, is it really worth it?

    Directory of Open Access Journals (Sweden)

    Sivave Mashingaidze

    2014-10-01

    Full Text Available The purpose of this article is to provide a framework for understanding and adoption of Business Intelligence by (SMEs within the Zimbabwean economy. The article explores every facet of Business Intelligence, including internal and external BI as cutting edge strategic asset. A descriptive research methodology has been adopted. The article revealed some BI critical success factors for better BI implementation. Findings revealed that organizations which have the greatest success with BI travel an evolutionary path, starting with basic data and analytical tools and transitioning to increasingly more sophisticated capabilities until BI becomes an intrinsic part of their business culture and ROI is realized. Findings are useful for managers, policy makers, business analysts, and IT specialists in dealing with planning and implementation of BI systems in SMEs.

  14. Quality assurance program plan for Building 324

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 324. This plan supersedes the PNNL Nuclear Facilities Quality Management System Description, PNL-NF-QMSD, Revision 2, dated March 1996. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements

  15. Measures to Combat Youth Unemployment Taken According to the Employment Plan. Second Edition.

    Science.gov (United States)

    Ministry of Education, Copenhagen (Denmark).

    This document is a report of the activities undertaken to help youths in Denmark find or train for employment under the provisions of the Employment Plan during the years 1978-1980. The report covers the history of the Employment Plan, a description of its Youth Programme, the various types of activities initiated by local and county authorities,…

  16. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  17. Cooperative organic mine avoidance path planning

    Science.gov (United States)

    McCubbin, Christopher B.; Piatko, Christine D.; Peterson, Adam V.; Donnald, Creighton R.; Cohen, David

    2005-06-01

    The JHU/APL Path Planning team has developed path planning techniques to look for paths that balance the utility and risk associated with different routes through a minefield. Extending on previous years' efforts, we investigated real-world Naval mine avoidance requirements and developed a tactical decision aid (TDA) that satisfies those requirements. APL has developed new mine path planning techniques using graph based and genetic algorithms which quickly produce near-minimum risk paths for complicated fitness functions incorporating risk, path length, ship kinematics, and naval doctrine. The TDA user interface, a Java Swing application that obtains data via Corba interfaces to path planning databases, allows the operator to explore a fusion of historic and in situ mine field data, control the path planner, and display the planning results. To provide a context for the minefield data, the user interface also renders data from the Digital Nautical Chart database, a database created by the National Geospatial-Intelligence Agency containing charts of the world's ports and coastal regions. This TDA has been developed in conjunction with the COMID (Cooperative Organic Mine Defense) system. This paper presents a description of the algorithms, architecture, and application produced.

  18. Theory of Planned Behavior including self-stigma and perceived barriers explain help-seeking behavior for sexual problems in Iranian women suffering from epilepsy.

    Science.gov (United States)

    Lin, Chung-Ying; Oveisi, Sonia; Burri, Andrea; Pakpour, Amir H

    2017-03-01

    To apply the Theory of Planned Behavior (TPB) and the two additional concepts self-stigma and perceived barriers to the help-seeking behavior for sexual problems in women with epilepsy. In this 18-month follow-up study, TPB elements, including attitude, subjective norm, perceived behavioral control, and behavioral intention along with self-stigma and perceived barriers in seeking help for sexual problems were assessed in n=818 women with epilepsy (94.0% aged ≤40years). The basic TPB model (model 1) and the TPB model additionally including self-stigma and perceived barriers (Model 2) were analyzed using structural equation modeling (SEM). Both SEM models showed satisfactory model fits. According to model, attitude, subjective norms, perceived behavioral control, and intention explained 63.1% of the variance in help-seeking behavior. Variance was slightly higher (64.5%) when including self-stigma and perceived barriers (model 2). In addition, the fit indices of the models were better highlighting the importance of self-stigma and perceived barriers in help-seeking behavior for sexual problems. Theory of Planned Behavior is useful in explaining help-seeking behavior for sexual problems in women with epilepsy. Self-stigma and perceived barriers are additional factors that should be considered in future interventions aiming to adopt TPB to improve help-seeking behavior for sexual problems. Copyright © 2017 Elsevier Inc. All rights reserved.

  19. Perception of Farm Succession Planning by Poultry Farmers in ...

    African Journals Online (AJOL)

    This study assessed poultry farm characteristics and poultry farmers' perception of farm succession planning in southwest Nigeria. A multistage sampling procedure was used in selecting poultry farmers in Oyo and Osun states. Data were analyzed using descriptive and inferential statistics. Results reveal that poultry farmers ...

  20. Customer-focused planning: Beyond integrated resource planning

    International Nuclear Information System (INIS)

    Hastings, P.C.

    1992-01-01

    Integrated resource planning (IRP) evolved from the growing recognition by utilities and regulators that efforts to influence the use of electricity by customers could be more cost-effective than simply expanding the generation system. Improvements in IRP methodology are taking many different forms. One major effort is to move planning closer to the customer. Customer-focused planning (CFP) starts with customer values and uses these to drive decision-making within the utility. CFP is process- rather than product- oriented and typically operates at the bulk power system level. Options available to meet customer needs include electricity, alternative fuels, capital substitution, and end-use management or control. The customer selects the option(s) based on a value set that typically includes safety, reliability, convenience, and cost. There are also four possible levels of decision-making: the end-use; customer/power meter; transmission/distribution interface; and the utility bulk power system. Challenges of implementing CFP include identifying customer wants, needs, and values; integration of utility planning efforts; and the dynamics of the CFP process, in which costs can change with each modification of the transmission and distribution system. Two examples of recent moves toward CFP at Central Maine Power are reviewed. 2 refs., 1 fig

  1. Standarized input for Hanford environmental impact statements. Part II: site description

    International Nuclear Information System (INIS)

    Jamison, J.D.

    1982-07-01

    Information is presented under the following section headings: summary description; location and physiography; geology; seismology; hydrology; meteorology; ecology; demography and land use; and radiological condition. Five appendixes are included on the 100N, 200 east, 200 west, 300, and 400 areas. This report is intended to provide a description of the Hanford Site against which the environmental impacts of new projects at Hanford can be assessed. It is expected that the summary description amplified with material from the appropriate appendix, will serve as the basic site description section of environmental impact statements prepared to address the requirements of the National Environmental Policy Act

  2. Integrating marker passing and problem solving a spreading activation approach to improved choice in planning

    CERN Document Server

    Hendler, James A

    2014-01-01

    A recent area of interest in the Artificial Intelligence community has been the application of massively parallel algorithms to enhance the choice mechanism in traditional AI problems. This volume provides a detailed description of how marker-passing -- a parallel, non-deductive, spreading activation algorithm -- is a powerful approach to refining the choice mechanisms in an AI problem-solving system. The author scrutinizes the design of both the algorithm and the system, and then reviews the current literature and research in planning and marker passing. Also included: a comparison of this

  3. System-Cost-Optimized Smart EVSE for Residential Application: Final Technical Report including Manufacturing Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Charles [Delta Products, Triangle Park, NC (United States)

    2015-05-15

    In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical

  4. Engineering Technical Review Planning Briefing

    Science.gov (United States)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  5. Implementation of Water Safety Plans (WSPs): A Case Study in the Coastal Area in Semarang City, Indonesia

    Science.gov (United States)

    Budiyono; Ginandjar, P.; Saraswati, L. D.; Pangestuti, D. R.; Martini; Jati, S. P.

    2018-02-01

    An area of 508.28 hectares in North Semarang is flooded by tidal inundation, including Bandarharjo village, which could affect water quality in the area. People in Bandarharjo use safe water from deep groundwater, without disinfection process. More than 90% of water samples in the Bandaharjo village had poor bacteriological quality. The aimed of the research was to describe the implementation of Water Safety Plans (WSPs) program in Bandarharjo village. This was a descriptive study with steps for implementations adopted the guidelines and tools of the World Health Organization. The steps consist of introducing WSPs program, team building, training the team, examination of water safety before risk assessment, risk assessment, minor repair I, examination of water safety risk, minor repair II (after monitoring). Data were analyzed using descriptive methods. WSPs program has been introduced and formed WSPs team, and the training of the team has been conducted. The team was able to conduct risks assessment, planned the activities, examined water quality, conduct minor repair and monitoring at the source, distribution, and households connection. The WSPs program could be implemented in the coastal area in Semarang, however regularly supervision and some adjustment are needed.

  6. ANALYTICAL AND SIMULATION PLANNING MODEL OF URBAN PASSENGER TRANSPORT

    Directory of Open Access Journals (Sweden)

    Andrey Borisovich Nikolaev

    2017-09-01

    Full Text Available The article described the structure of the analytical and simulation models to make informed decisions in the planning of urban passenger transport. Designed UML diagram that describes the relationship of classes of the proposed model. A description of the main agents of the model developed in the simulation AnyLogic. Designed user interface integration with GIS map. Also provides simulation results that allow concluding about her health and the possibility of its use in solving planning problems of urban passenger transport.

  7. Strategic planning: the first step in the planning process.

    Science.gov (United States)

    Gelinas, Marc A

    2003-01-01

    Strategic planning is a systematic process through which an organization builds commitment among key stakeholders to goals and priorities which are essential to its mission and vision, and responsive to the operating environment. Strategic planning is the first step in a comprehensive planning process that also includes business planning and implementation planning. If all three steps are carried out in sequence, strategic planning can be a very effective means of educating the stakeholders about where the cancer program is and where it is going, gaining support and commitment for the direction that the cancer program will take, and assuring that everyone's expectations can be managed effectively. Unfortunately, some organizations and cancer program leaders misunderstand the process. Too often, strategic planning is used as a stand-alone activity. This article will describe what strategic planning is, how it should smoothly lead into business planning and implementation planning, and how to avoid the pitfalls that sometimes arise during the strategic planning effort.

  8. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  9. A Test of Strategies for Enhanced Learning of AP Descriptive Chemistry

    Science.gov (United States)

    Kotcherlakota, Suhasini; Brooks, David W.

    2008-01-01

    The Advanced Placement (AP) Descriptive Chemistry Website allows users to practice chemistry problems. This study involved the redesign of the Website using worked examples to enhance learner performance. The population sample for the study includes users (students and teachers) interested in learning descriptive chemistry materials. The users…

  10. Hardware description languages

    Science.gov (United States)

    Tucker, Jerry H.

    1994-01-01

    Hardware description languages are special purpose programming languages. They are primarily used to specify the behavior of digital systems and are rapidly replacing traditional digital system design techniques. This is because they allow the designer to concentrate on how the system should operate rather than on implementation details. Hardware description languages allow a digital system to be described with a wide range of abstraction, and they support top down design techniques. A key feature of any hardware description language environment is its ability to simulate the modeled system. The two most important hardware description languages are Verilog and VHDL. Verilog has been the dominant language for the design of application specific integrated circuits (ASIC's). However, VHDL is rapidly gaining in popularity.

  11. Operations planning for Space Station Freedom - And beyond

    Science.gov (United States)

    Gibson, Stephen S.; Martin, Thomas E.; Durham, H. J.

    1992-01-01

    The potential of automated planning and electronic execution systems for enhancing operations on board Space Station Freedom (SSF) are discussed. To exploit this potential the Operations Planning and Scheduling Subsystem is being developed at the NASA Johnson Space Center. Such systems may also make valuable contributions to the operation of resource-constrained, long-duration space habitats of the future. Points that should be considered during the design of future long-duration manned space missions are discussed. Early development of a detailed operations concept as an end-to-end mission description offers a basis for iterative design evaluation, refinement, and option comparison, particularly when used with an advanced operations planning system capable of modeling the operations and resource constraints of the proposed designs.

  12. Salt Repository Project. FY-84 technical project plan

    International Nuclear Information System (INIS)

    1984-08-01

    The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask

  13. Savannah River Interim Waste Management Program Plan - FY 1986

    International Nuclear Information System (INIS)

    1985-09-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1986. In addition, the document projects activities for several years beyond 1986 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of May 1985

  14. Savannah River Interim Waste Management Program plan, FY-1987

    International Nuclear Information System (INIS)

    1986-09-01

    This document provides the program plan as requested by the Savannah River Operations office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1987. In addition, the document projects activities for several years beyond 1987 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1986

  15. ELECTRICAL SUPPORT SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    Roy, S.

    2004-01-01

    The purpose of this revision of the System Design Description (SDD) is to establish requirements that drive the design of the electrical support system and their bases to allow the design effort to proceed to License Application. This SDD is a living document that will be revised at strategic points as the design matures over time. This SDD identifies the requirements and describes the system design as they exist at this time, with emphasis on those attributes of the design provided to meet the requirements. This SDD has been developed to be an engineering tool for design control. Accordingly, the primary audience/users are design engineers. This type of SDD both ''leads'' and ''trails'' the design process. It leads the design process with regard to the flow down of upper tier requirements onto the system. Knowledge of these requirements is essential in performing the design process. The SDD trails the design with regard to the description of the system. The description provided in the SDD is a reflection of the results of the design process to date. Functional and operational requirements applicable to electrical support systems are obtained from the ''Project Functional and Operational Requirements'' (F andOR) (Siddoway 2003). Other requirements to support the design process have been taken from higher-level requirements documents such as the ''Project Design Criteria Document'' (PDC) (Doraswamy 2004), and fire hazards analyses. The above-mentioned low-level documents address ''Project Requirements Document'' (PRD) (Canon and Leitner 2003) requirements. This SDD contains several appendices that include supporting information. Appendix B lists key system charts, diagrams, drawings, and lists, and Appendix C includes a list of system procedures

  16. Bottom-up approach for decentralised energy planning. Case study of Tumkur district in India

    Energy Technology Data Exchange (ETDEWEB)

    Hiremath, Rahul B. [Walchand Institute of Technology, Solapur 413006 (India); Kumar, Bimlesh [Civil Engineering, Indian Institute of Technology, Guwahati 781039 (India); Balachandra, P. [Energy Technology Innovation Policy, Belfer Center for Science and International Affairs, Harvard Kennedy School, Harvard University, Cambridge, MA 02138 (United States); Ravindranath, N.H. [CST, IISc, Bangalore 560012 (India)

    2010-02-15

    Decentralized Energy Planning (DEP) is one of the options to meet the rural and small-scale energy needs in a reliable, affordable and environmentally sustainable way. The main aspect of the energy planning at decentralized level would be to prepare an area-based DEP to meet energy needs and development of alternate energy sources at least-cost to the economy and environment. Present work uses goal-programming method in order to analyze the DEP through bottom-up approach. This approach includes planning from the lowest scale of Tumkur district in India. The scale of analysis included village level - Ungra, panchayat level (local council) - Yedavani, block level - Kunigal and district level - Tumkur. The approach adopted was bottom-up (village to district) to allow a detailed description of energy services and the resulting demand for energy forms and supply technologies. Different scenarios are considered at four decentralized scales for the year 2005 and are developed and analyzed for the year 2020. Decentralized bioenergy system for producing biogas and electricity, using local biomass resources, are shown to promote development compared to other renewables. This is because, apart from meeting energy needs, multiple goals could be achieved such as self-reliance, local employment, and land reclamation apart from CO{sub 2} emissions reduction. (author)

  17. Bottom-up approach for decentralised energy planning: Case study of Tumkur district in India

    Energy Technology Data Exchange (ETDEWEB)

    Hiremath, Rahul B., E-mail: rahulhiremath@gmail.co [Walchand Institute of Technology Solapur 413006 (India); Kumar, Bimlesh, E-mail: bimk@iitg.ernet.i [Civil Engineering, Indian Institute of Technology, Guwahati 781039 (India); Balachandra, P., E-mail: balachandra_patil@hks.harvard.ed [Energy Technology Innovation Policy, Belfer Center for Science and International Affairs, Harvard Kennedy School, Harvard University, Cambridge, MA 02138 (United States); Ravindranath, N.H., E-mail: ravi@ces.iisc.ernet.i [CST, IISc, Bangalore 560012 (India)

    2010-02-15

    Decentralized Energy Planning (DEP) is one of the options to meet the rural and small-scale energy needs in a reliable, affordable and environmentally sustainable way. The main aspect of the energy planning at decentralized level would be to prepare an area-based DEP to meet energy needs and development of alternate energy sources at least-cost to the economy and environment. Present work uses goal-programming method in order to analyze the DEP through bottom-up approach. This approach includes planning from the lowest scale of Tumkur district in India. The scale of analysis included village level-Ungra, panchayat level (local council)-Yedavani, block level-Kunigal and district level-Tumkur. The approach adopted was bottom-up (village to district) to allow a detailed description of energy services and the resulting demand for energy forms and supply technologies. Different scenarios are considered at four decentralized scales for the year 2005 and are developed and analyzed for the year 2020. Decentralized bioenergy system for producing biogas and electricity, using local biomass resources, are shown to promote development compared to other renewables. This is because, apart from meeting energy needs, multiple goals could be achieved such as self-reliance, local employment, and land reclamation apart from CO{sub 2} emissions reduction.

  18. To Plan or Not to Plan, That Is the Question

    Science.gov (United States)

    Dolph, David A.

    2016-01-01

    Strategic planning is a process utilized by numerous organizations, including K-12 school boards, intent on improvement and reform. A thoughtful strategic planning process can help develop a board's desired future driven by goals and strategies aimed at progress. However, improvement processes such as strategic planning are challenging. In fact,…

  19. Planning and Macrostructural Elements for a Multilingual Culinary ...

    African Journals Online (AJOL)

    This paper is an account of an ongoing dictionary project. It aims to outline the main features of the planned dictionary. The project is a first of its kind in Gabonese lexicography. The current paper gives a description of the data collection and sources as well as the macrostructural issues of the forthcoming dictionary.

  20. Site scientific mission plan for the Southern Great Plains CART Site, January--June 1999

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Sisterson, D.L.; Lamb, P.

    1999-03-10

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site was designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This Site Scientific Mission Plan defines the scientific priorities for site activities during the six months beginning on January 1, 1999, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this document is to provide scientific guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, and Instrument Team [IT]) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the site program manager, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.