WorldWideScience

Sample records for plan fy 2004-2008

  1. Pacific Northwest National Laboratory Institutional Plan FY 2004-2008

    Energy Technology Data Exchange (ETDEWEB)

    Quadrel, Marilyn J.

    2004-04-15

    This Institutional Plan for FY 2004-2008 is the principal annual planning document submitted to the Department of Energy's Office of Science by Pacific Northwest National Laboratory in Richland, Washington. This plan describes the Laboratory's mission, roles, and technical capabilities in support of Department of Energy priorities, missions, and plans. It also describes the Laboratory strategic plan, key planning assumptions, major research initiatives, and program strategy for fundamental science, energy resources, environmental quality, and national security.

  2. Pacific Northwest National Laboratory Institutional Plan FY 2000-2004

    Energy Technology Data Exchange (ETDEWEB)

    Pearson, Erik W.

    2000-03-01

    The Pacific Northwest National Laboratory Institutional Plan for FY 2000-2004 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; management practices and standards; and communications and trust.

  3. FY 2004 Supplement to the President`s Budget

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — ...This Supplement to the Presidents Budget for Fiscal Year (FY) 2004 summarizes the NITRD agencies coordinated research activities and FY 2004 plans, as required by...

  4. Hangman Restoration Project Year-End Report FY2008.

    Energy Technology Data Exchange (ETDEWEB)

    Coeur d' Alene Tribe Department of Natural Resources.

    2008-11-12

    This report covers the main goals of FY2008 from which the Work Elements were derived. The goals and products are listed by heading and the associated work elements are referenced in the text. A list of the FY2008 Work Elements is included as Appendix A. FY2008 witnessed the completion of the hntkwipn Management Plan and the first substantive efforts to restore the important habitats encompassed by the mitigation properties in the Upper Hangman Watershed. Native grasses were planted and germination was evaluated. Also, drain tiles that greatly altered the hydrologic function of the Sheep and Hangman Creek Flood Plains were removed and/or disrupted. Preparation for future restoration efforts were also made in FY2008. Designs were produced for the realignment of Sheep Creek and the decommissioning of seven drainage ditches within hntkwipn. A prioritization plan was drafted that greatly expands the area of focus for restoring native fish population in Hangman Creek.

  5. Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004

    Energy Technology Data Exchange (ETDEWEB)

    Chartock, Mike (ed.); Hansen, Todd (ed.)

    1999-08-01

    The FY 2000-2004 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.

  6. Institutional plan FY 2004 - FY 2008

    International Nuclear Information System (INIS)

    Beggs, S. D.

    2004-01-01

    Argonne's mission is to serve DOE and national security by advancing the frontiers of knowledge, by creating and operating forefront scientific user facilities, and by providing innovative and effective approaches and solutions to energy, environmental, and security challenges to national and global well-being, in the near and long term, as a contributing member of the DOE laboratory system. We contribute significantly to DOE's mission in science, energy resources, environmental stewardship, and national security, with lead roles in the areas of science, operation of scientific facilities, and energy. In accomplishing our mission, we partner with DOE, other federal laboratories and agencies, the academic community, and the private sector. Argonne is pursuing ten visionary strategic goals to deliver extraordinary science and technology with significant value to the nation: (1) Develop the technologies and infrastructure needed to produce, store, and distribute hydrogen fuel. (2) Close the nuclear fuel cycle, reducing the cost of nuclear waste disposal by billions of dollars and disposing of weapons-grade plutonium and actinides. (3) Develop advanced nuclear power technologies that are safe, economical, proliferation-resistant, and environmentally sustainable. (4) Plan, design, construct, and operate the Rare Isotope Accelerator (RIA) and make fundamental discoveries in nuclear physics and astrophysics. (5) Construct and operate the Center for Nanoscale Materials and create innovative materials with valuable commercial properties. (6) Lead the Genomes to Life team that focuses on protein production and related proteomics; implement computational biology to build fundamental understanding of living systems. (7) Realize the full potential of scientific simulation to solve mission-related problems, through leading-edge research on systems architecture and software, parallel programming and numerical tools, distributed computing, and computational science applications

  7. 77 FR 15142 - Updated Nuclear Regulatory Commission Fiscal Years 2008-2013 Strategic Plan

    Science.gov (United States)

    2012-03-14

    ... 2008-2013 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Strategic plan. SUMMARY: The U...-1614, Volume 5, ``U.S. Nuclear Regulatory Commission, Fiscal Years [FY] 2008-2013 Strategic Plan,'' dated February 2012. The updated FY 2008-2013 strategic plan describes the agency's mission and...

  8. Sandia National Laboratories Institutional Plan: FY 1999-2004

    Energy Technology Data Exchange (ETDEWEB)

    Garber, D.P.

    1999-01-06

    This Institutional Plan is the most comprehensive yearly "snapshot" available of Sandia National Laboratories' major programs, facilities, human resources, and budget. The document also includes overviews of our missions, organization, capabilities, planning functions, milestones, and accomplishments. The document's purpose is to provide the above information to the US Department of Energy, key congressional committees, Sandia management, and other present and potential customers. Chapter 2 presents information about Sandia's mission and summarizes our recent revision of Sandia's Strategic Plan. Chapter 3 presents an overview of Sandia's strategic objectives, chapter 4 lists laboratory goals and milestones for FY 1999, and chapter 5 presents our accomplishments during FY 1998. Chapters 3 through 5 are organized around our eight strategic objectives. The four primary objectives cover nuclear weapons responsibilities, nonproliferation and materials control, energy and critical infrastructures, and emerging national security threats. The major programmatic initiatives are presented in chapter 7. However, the programmatic descriptions in chapter 6 and the Associated funding tables in chapter 9 continue to be presented by DOE Budget and Reporting Code, as in previous Sandia institutional plans. As an aid to the reader, the four primary strategic objectives in chapter 3 are cross-referenced to the program information in chapter 6.

  9. FY 2008 Public Libraries Survey

    Data.gov (United States)

    Institute of Museum and Library Services — Dig into FY 2008 data on public library systems (referred to as administrative entities in the Public Libraries Survey) and main libraries, branches, and bookmobiles...

  10. NATURAL BARRIERS TARGETED THRUST FY 2004 PROJECTS

    International Nuclear Information System (INIS)

    NA

    2005-01-01

    This booklet contains project descriptions of work performed by the Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM), Office of Science and Technology and International's (OSTandI) Natural Barriers Targeted Thrust during Fiscal Year (FY) 2004. The Natural Barriers Targeted Thrust is part of OSTandI's Science and Technology Program which supports the OCRWM mission to manage and dispose of high-level radioactive waste and spent nuclear fuel in a manner that protects health, safety, and the environment; enhances national and energy security; and merits public confidence. In general, the projects described will continue beyond FY 2004 assuming that the technical work remains relevant to the proposed Yucca Mountain Repository and sufficient funding is made available to the Science and Technology Program

  11. NATURAL BARRIERS TARGETED THRUST FY 2004 PROJECTS

    Energy Technology Data Exchange (ETDEWEB)

    NA

    2005-07-27

    This booklet contains project descriptions of work performed by the Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM), Office of Science and Technology and International's (OST&I) Natural Barriers Targeted Thrust during Fiscal Year (FY) 2004. The Natural Barriers Targeted Thrust is part of OST&I's Science and Technology Program which supports the OCRWM mission to manage and dispose of high-level radioactive waste and spent nuclear fuel in a manner that protects health, safety, and the environment; enhances national and energy security; and merits public confidence. In general, the projects described will continue beyond FY 2004 assuming that the technical work remains relevant to the proposed Yucca Mountain Repository and sufficient funding is made available to the Science and Technology Program.

  12. Annual report of the Neutron Irradiation and Testing Reactor Center. FY 2008. April 1, 2008 - March 31, 2009

    International Nuclear Information System (INIS)

    2009-12-01

    The JMTR, one of the most high flux test reactors in the world, has been used for the irradiation experiments of fuels and materials related to LWRs, fundamental research and radioisotope productions. The JMTR was stopped at the beginning of August 2006 to conduct refurbishment works, and the reoperation will be planned from FY 2011. After reoperation, the JMTR will contribute to many fields, such as the lifetime extension of LWRs, expansion of industrial use, progress of science and technology. This report summarizes the activities on refurbishment works, development of new irradiation techniques, enhancement of reactor availability, etc. in FY 2008. (author)

  13. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  14. Review of research on simulation engineering in FY2008

    International Nuclear Information System (INIS)

    2010-02-01

    Research on simulation engineering for nuclear applications, based on 'the plan for meeting the mid-term goal of the Japan Atomic Energy Agency', has been performed at Center for Computational Science and e-Systems, Japan Atomic Energy Agency (CCSE/JAEA). CCSE established the committee consisting outside experts and authorities which does research evaluation and advices for the assistance of the research and development. This report summarizes the result of the evaluation by the committee on the research on simulation engineering performed at CCSE/JAEA in FY2008. (author)

  15. The NITRD Program: FY2004 Interagency Coordination Report

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — This Interagency Coordination Report ICR provides a comprehensive description of the FY 2004 activities of the multi-agency $2 billion Federal Networking and...

  16. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  17. DOE Solar Energy Technologies Program: FY 2004 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    2005-10-01

    The DOE Solar Energy Technologies Program FY 2004 Annual Report chronicles the R&D results of the U.S. Department of Energy Solar Energy Technologies Program for Fiscal Year 2004. In particular, the report describes R&D performed by the Program's national laboratories (National Renewable Energy Laboratory, Sandia National Laboratories, Oak Ridge National Laboratory, and Brookhaven National Laboratory) and university and industry partners.

  18. Sustainable NREL - Site Sustainability Plan FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-01-01

    NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

  19. Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs - FY 2008 Budget Request

    Energy Technology Data Exchange (ETDEWEB)

    2007-03-01

    This document summarizes the results of the benefits analysis of EERE's programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and for each of its nine Research, Development, Demonstration, and Deployment (RD3) programs. Benefits for the FY 2008 budget request are estimated for the midterm (2008-2030) and long term (2030-2050).

  20. FY 2008 Supplement to the President`s Budget

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — This Supplement to the President`s Fiscal Year FY 2008 Budget provides a technical summary of the budget request for the Networking and Information Technology...

  1. FY 2005 Supplement to the President`s Budget

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — The Supplement to the President`s FY 2005 Budget reports on the FY 2004 research and development R and D activities and FY 2005 plans of the multiagency Networking...

  2. Tanks focus area multiyear program plan - FY96-FY98

    International Nuclear Information System (INIS)

    1995-07-01

    The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary

  3. ORNLs Laboratory Directed Research and Development Program FY 2008 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-03-01

    The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2008. The associated FY 2008 ORNL LDRD Self-Assessment (ORNL/PPA-2008/2) provides financial data and an internal evaluation of the program’s management process.

  4. Decreasing Prevalence of Obesity Among Young Children in Massachusetts From 2004 to 2008

    Science.gov (United States)

    Gillman, Matthew W.; Rifas-Shiman, Sheryl L.; Sherry, Bettylou; Kleinman, Ken; Taveras, Elsie M.

    2012-01-01

    OBJECTIVE: To examine whether the obesity prevalence is increasing, level, or decreasing among young US children (aged children) at a multisite pediatric practice in eastern Massachusetts during 1999–2008. By using the Centers for Disease Control and Prevention 2000 gender-specific growth charts, we defined obesity as weight-for-length ≥95th percentile for children aged children aged 24 to obesity trends in 2 separate periods, 1999–2003 and 20042008, adjusting for age group, race/ethnicity, health insurance, and practice site. RESULTS: From 1999 to 2003, the obesity prevalence was fairly stable among both boys and girls. From 2004 to 2008, the obesity prevalence substantially decreased among both boys and girls. The decline in obesity prevalence during 20042008 was more pronounced among children insured by non-Medicaid health plans than among those insured by Medicaid. CONCLUSIONS: Among children aged obesity prevalence decreased during 20042008, which is in line with national data showing no increase in prevalence during this time period. The smaller decrease among Medicaid-insured children may portend widening of socioeconomic disparities in childhood obesity. PMID:22529276

  5. Pinellas Plant FY1990 site specific implementation plan

    International Nuclear Information System (INIS)

    Klein, R.D.

    1990-02-01

    This Site Specific Implementation Plan describes the Corrective Action, Environmental Restoration, and Waste Management activities to be performed at the Pinellas Plant in FY1990 (October 1, 1989 to September 30, 1989). These FY1990 activities are described in the Pinellas Plant FY1991--95 Five-Year Plan. The information used to prepare this plan reflects the best estimate of the project scope, schedules, regulatory, and funding requirements at the time of plan preparation. The Environmental Restoration/Waste Management Five-Year Plan is a dynamic document and will be modified each year; the Site Specific Implementation Plan will, in turn, be modified each year to reflect new findings, information, and knowledge of the various projects. 4 figs., 11 tabs

  6. Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Marmorek, David R.; Porter, Marc; Pickard, Darcy; Wieckowski, Katherine

    2008-11-19

    The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These

  7. A plan for administrative computing at ANL FY1991 through FY1993

    Energy Technology Data Exchange (ETDEWEB)

    Caruthers, L.E. (ed.); O' Brien, D.E.; Bretscher, M.E.; Hischier, R.C.; Moore, N.J.; Slade, R.G.

    1990-10-01

    In July of 1988, Argonne National Laboratory management approved the restructuring of Computing Services into the Computing and Telecommunications Division, part of the Physical Research area of the Laboratory. One major area of the Computing and Telecommunications Division is Management Information Systems (MIS). A significant aspect of Management Information Systems' work is the development of proposals for new and enhanced administrative computing systems based on an analysis of informational needs. This document represent the outcome of the planning process for FY1991 through FY1993. The introduction of the FY1991 through FY1993 Long-Range Plan assesses the state of administrative computing at ANL and the implications of FY1991 funding recommendations. It includes a history of MIS planning for administrative data processing. This document discusses the strategy and goals which are an important part of administrative data processing plans for the Laboratory. It also describes the management guidelines established by the Administrative Data Processing Oversight Committee for the proposal and implementation of administrative computing systems. Summaries of the proposals for new or enhanced administrative computing systems presented by individual divisions or departments with assistance of Management Information Systems, to the Administrative Data Processing Oversight Committee are given. The detailed tables in this paper give information on how much the resources to develop and implement a given systems will cost its users. The tables include development costs, computing/operations costs, software and hardware costs, and efforts costs. They include both systems funded by Laboratory General Expense and systems funded by the users themselves.

  8. Appendix C: Biomass Program inputs for FY 2008 benefits estimates

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.

  9. Idaho National Laboratory Cultural Resource Monitoring Report for FY 2008

    Energy Technology Data Exchange (ETDEWEB)

    Brenda R. Pace

    2009-01-01

    This report describes the cultural resource monitoring activities of the Idaho National Laboratory’s (INL) Cultural Resource Management (CRM) Office during fiscal year 2008 (FY 2008). Throughout the year, 45 cultural resource localities were revisited including: two locations of heightened Shoshone-Bannock tribal sensitivity, four caves, one butte, twenty-eight prehistoric archaeological sites, three historic homesteads, two historic stage stations, one historic canal construction camp, three historic trails, and Experimental Breeder Reactor-I, which is a designated National Historic Landmark. Several INL project areas were also monitored in FY 2008 to assess project compliance with cultural resource recommendations, confirm the locations of previously recorded cultural resources in relation to project activities, to assess the damage caused by fire-fighting efforts, and to watch for cultural materials during ground disturbing activities. Although impacts were documented at a few locations, no significant adverse effects that would threaten the National Register eligibility of any resource were observed. Monitoring also demonstrated that INL projects generally remain in compliance with recommendations to protect cultural resources

  10. National Ignition Facility (NIF) FY2015 Facility Use Plan

    Energy Technology Data Exchange (ETDEWEB)

    Folta, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wisoff, Jeff [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-12-18

    Major features of the FY2015 NIF Use Plan include: • Performing a record number of layered DT experiments with 28 planned compared with 15 in FY2014. Executing the first plutonium experiments on the NIF in support of the Science Campaigns. • Over 300 targets shots, a 57% increase compared to FY14. This is a stretch goal defined in the 120-Day Study document, and relies upon the success of many shot-rate improvement actions, as well as on the distribution of shot type selected by the users. While the Plan is consistent with this goal, the increased proportion of layered DT experiments described above reduces the margin against this goal. • Commissioning of initial ARC capability, which will support both SSP-HED and SSPICF programs. • Increase in days allocated to Discovery Science to a level that supports an ongoing program for academic use of NIF and an annual solicitation for new proposals. • Six Facility Maintenance and Reconfiguration (FM&R) periods totaling 30 days dedicated to major facility maintenance and modifications. • Utilization of the NIF Facility Advisory Schedule Committee (FASC) to provide stakeholder review and feedback on the NIF schedule. The Use Plan assumes a total FY2015 LLNL NIF Operations funding in MTE 10.7 of $229.465M and in MTE 10.3 of 47.0M. This Use Plan will be revised in the event of significant changes to the FY2015 funding or if NNSA provides FY2016 budget guidance significantly reduced compared to FY2015.

  11. DOE Hydropower Program Annual Report for FY 2004

    Energy Technology Data Exchange (ETDEWEB)

    Sommers, Garold L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hunt, Richard T. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Cada, Glenn F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sale, Michael J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Dauble, Dennis D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carlson, Thomas [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ahlgrimm, James [U.S. Dept. of Energy, Washington, D.C. (United States); Acker, Tomas L. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2005-02-01

    This report describes the progress of the R&D conducted in FY 2004 the under four program areas at the time: (1) Advanced Hydropower Technology (Large Turbine Field Testing, Water Use Optimization, and Improved Mitigation Practices); (2) Supporting Research and Testing (Environmental Performance Testing Methods, Computational and Physical Modeling, Instrumentation and Controls, and Environmental Analysis); (3) Systems Integration and Technology Acceptance (Hydro/Wind Integration, National Hydropower Collaborative, and Integration and Communications); and (4) Supporting Engineering and Analysis (Valuation Methods and Assessments and Characterization of Innovative Technology).

  12. FY 1999 annual work plan for infrastructure program WBS 6

    Energy Technology Data Exchange (ETDEWEB)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  13. 78 FR 56271 - FY 2014-2020 Draft VA Strategic Plan

    Science.gov (United States)

    2013-09-12

    ... DEPARTMENT OF VETERANS AFFAIRS FY 2014-2020 Draft VA Strategic Plan AGENCY: Department of Veterans... Affairs (VA) is announcing the availability of the FY 2014-2020 Draft VA Strategic Plan (Strategic Plan... Act of 2010 (GPRAMA) (Pub. L. 111-352). The Strategic Plan provides the Department's long-term...

  14. Spent fuel sabotage aerosol ratio program : FY 2004 test and data summary.

    Energy Technology Data Exchange (ETDEWEB)

    Brucher, Wenzel (Gesellschaft fur Anlagen- und Reaktorsicherheit, Germany); Koch, Wolfgang (Fraunhofer Institut fur Toxikologie und Experimentelle Medizin, Germany); Pretzsch, Gunter Guido (Gesellschaft fur Anlagen- und Reaktorsicherheit, Germany); Loiseau, Olivier (Institut de Radioprotection et de Surete Nucleaire, France); Mo, Tin (U.S. Nuclear Regulatory Commission, Washington, DC); Billone, Michael C. (Argonne National Laboratory, Argonne, IL); Autrusson, Bruno A. (Institut de Radioprotection et de Surete Nucleaire, France); Young, F. I. (U.S. Nuclear Regulatory Commission, Washington, DC); Coats, Richard Lee; Burtseva, Tatiana (Argonne National Laboratory, Argonne, IL); Luna, Robert Earl; Dickey, Roy R.; Sorenson, Ken Bryce; Nolte, Oliver (Fraunhofer Institut fur Toxikologie und Experimentelle Medizin, Germany); Thompson, Nancy Slater (U.S. Department of Energy, Washington, DC); Hibbs, Russell S. (U.S. Department of Energy, Washington, DC); Gregson, Michael Warren; Lange, Florentin (Gesellschaft fur Anlagen- und Reaktorsicherheit, Germany); Molecke, Martin Alan; Tsai, Han-Chung (Argonne National Laboratory, Argonne, IL)

    2005-07-01

    This multinational, multi-phase spent fuel sabotage test program is quantifying the aerosol particles produced when the products of a high energy density device (HEDD) interact with and explosively particulate test rodlets that contain pellets of either surrogate materials or actual spent fuel. This program has been underway for several years. This program provides data that are relevant to some sabotage scenarios in relation to spent fuel transport and storage casks, and associated risk assessments. The program also provides significant technical and political benefits in international cooperation. We are quantifying the Spent Fuel Ratio (SFR), the ratio of the aerosol particles released from HEDD-impacted actual spent fuel to the aerosol particles produced from surrogate materials, measured under closely matched test conditions, in a contained test chamber. In addition, we are measuring the amounts, nuclide content, size distribution of the released aerosol materials, and enhanced sorption of volatile fission product nuclides onto specific aerosol particle size fractions. These data are the input for follow-on modeling studies to quantify respirable hazards, associated radiological risk assessments, vulnerability assessments, and potential cask physical protection design modifications. This document includes an updated description of the test program and test components for all work and plans made, or revised, during FY 2004. It also serves as a program status report as of the end of FY 2004. All available test results, observations, and aerosol analyses plus interpretations--primarily for surrogate material Phase 2 tests, series 2/5A through 2/9B, using cerium oxide sintered ceramic pellets are included. Advanced plans and progress are described for upcoming tests with unirradiated, depleted uranium oxide and actual spent fuel test rodlets. This spent fuel sabotage--aerosol test program is coordinated with the international Working Group for Sabotage Concerns of

  15. Spent fuel sabotage aerosol ratio program : FY 2004 test and data summary

    International Nuclear Information System (INIS)

    Brucher, Wenzel; Koch, Wolfgang; Pretzsch, Gunter Guido; Loiseau, Olivier; Mo, Tin; Billone, Michael C.; Autrusson, Bruno A.; Young, F. I.; Coats, Richard Lee; Burtseva, Tatiana; Luna, Robert Earl; Dickey, Roy R.; Sorenson, Ken Bryce; Nolte, Oliver; Thompson, Nancy Slater; Hibbs, Russell S.; Gregson, Michael Warren; Lange, Florentin; Molecke, Martin Alan; Tsai, Han-Chung

    2005-01-01

    This multinational, multi-phase spent fuel sabotage test program is quantifying the aerosol particles produced when the products of a high energy density device (HEDD) interact with and explosively particulate test rodlets that contain pellets of either surrogate materials or actual spent fuel. This program has been underway for several years. This program provides data that are relevant to some sabotage scenarios in relation to spent fuel transport and storage casks, and associated risk assessments. The program also provides significant technical and political benefits in international cooperation. We are quantifying the Spent Fuel Ratio (SFR), the ratio of the aerosol particles released from HEDD-impacted actual spent fuel to the aerosol particles produced from surrogate materials, measured under closely matched test conditions, in a contained test chamber. In addition, we are measuring the amounts, nuclide content, size distribution of the released aerosol materials, and enhanced sorption of volatile fission product nuclides onto specific aerosol particle size fractions. These data are the input for follow-on modeling studies to quantify respirable hazards, associated radiological risk assessments, vulnerability assessments, and potential cask physical protection design modifications. This document includes an updated description of the test program and test components for all work and plans made, or revised, during FY 2004. It also serves as a program status report as of the end of FY 2004. All available test results, observations, and aerosol analyses plus interpretations--primarily for surrogate material Phase 2 tests, series 2/5A through 2/9B, using cerium oxide sintered ceramic pellets are included. Advanced plans and progress are described for upcoming tests with unirradiated, depleted uranium oxide and actual spent fuel test rodlets. This spent fuel sabotage--aerosol test program is coordinated with the international Working Group for Sabotage Concerns of

  16. Mixed Waste Management Facility, revised FY94 Plan

    International Nuclear Information System (INIS)

    Streit, R.

    1994-01-01

    This revision of the FY94 Plan incorporates changes to work during FY94 in response to the DOE request in the DOE KD-1 decision letter of June 28,1994. This letter provided guidance of both scope and budget profile in response to the Conceptual Design Report (CDR) issued by the MWMF Project in April, 1994. This work plan only addresses work for the remainder of FY94. A revised plan for the complete project is in development and will be issued separately. Since February, 1994, the MWMF Project has been operating on DOE guidance directing that work on the CDR be completed, that only other essential work be continued to maintain the project, and that costs be maintained at approximately the January, 1994 spending levels until a KD-1 decision was made. This has formed the basis for monthly reports through June, 1994. The baseline contained in this report will become the basis for reports during the remainder of FY94

  17. Audit and Evaluation Plan FY 2002

    National Research Council Canada - National Science Library

    2002-01-01

    .... These projects also have been coordinated in the joint audit and inspection planning groups that address coverage in each major functional area. The plan also includes audit policy and oversight projects planned to start in FY 2002; however, intelligence coverage will be addressed separately.

  18. State, Foreign Operations, and Related Programs: FY2008 Appropriations

    Science.gov (United States)

    2007-12-14

    and social reforms. The President initially pledged $5 billion annually by FY2006, although funds requested and appropriated have never reached this...to Cuba. The BBG is planning to eliminate several VOA services including Uzbek, Greek, and Cantonese as well as the RFE/RL Macedonia service. BBG also...increased to $230.0 million. The increase of $195 million is entirely for social services to Iraqi refugees. FY2007 Supplemental Request. On April 25

  19. Laboratory Directed Research and Development Program FY 2008 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    editor, Todd C Hansen

    2009-02-23

    The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab or LBNL) is a multi-program national research facility operated by the University of California for the Department of Energy (DOE). As an integral element of DOE's National Laboratory System, Berkeley Lab supports DOE's missions in fundamental science, energy resources, and environmental quality. Berkeley Lab programs advance four distinct goals for DOE and the nation: (1) To perform leading multidisciplinary research in the computing sciences, physical sciences, energy sciences, biosciences, and general sciences in a manner that ensures employee and public safety and protection of the environment. (2) To develop and operate unique national experimental facilities for qualified investigators. (3) To educate and train future generations of scientists and engineers to promote national science and education goals. (4) To transfer knowledge and technological innovations and to foster productive relationships among Berkeley Lab's research programs, universities, and industry in order to promote national economic competitiveness. Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2008 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). The LDRD program supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under

  20. Laboratory Directed Research and Development Program FY 2008 Annual Report

    International Nuclear Information System (INIS)

    Hansen, Todd C.

    2009-01-01

    The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab or LBNL) is a multi-program national research facility operated by the University of California for the Department of Energy (DOE). As an integral element of DOE's National Laboratory System, Berkeley Lab supports DOE's missions in fundamental science, energy resources, and environmental quality. Berkeley Lab programs advance four distinct goals for DOE and the nation: (1) To perform leading multidisciplinary research in the computing sciences, physical sciences, energy sciences, biosciences, and general sciences in a manner that ensures employee and public safety and protection of the environment. (2) To develop and operate unique national experimental facilities for qualified investigators. (3) To educate and train future generations of scientists and engineers to promote national science and education goals. (4) To transfer knowledge and technological innovations and to foster productive relationships among Berkeley Lab's research programs, universities, and industry in order to promote national economic competitiveness. Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2008 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). The LDRD program supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the

  1. Oak Ridge National Laboratory Institutional Plan FY 1984-FY 1989

    International Nuclear Information System (INIS)

    1983-11-01

    In this plan, Oak Ridge National Laboratory (ORNL) continues to be committed to scientific and technological research that is based on technical excellence and innovation and that provides a foundation for and a stimulus to broader and more sustained economic growth. DOE is being asked to assist in establishing a new program for Laboratory cooperation with industry, beginning with an initial focus on materials science. The current Institutional Plan thus projects growth in the materials science area as well as in other basic physical science areas and suggests a new initiative designed to extend the various technology transfer activities and to make them more effective by using ORNL as the trial Laboratory for some of these different approaches. This Institutional Plan projects a stable future for ORNL, with only modest amounts of growth in selected areas of research for the FY 1984-FY 1989 planning cycle. Summaries of the overall picture of the proposed budget and personnel levels for the current planning cycle are included. Scientific programs, laboratory resource development, and private sector interactions are discussed

  2. Appendix E: Wind Technologies Program inputs for FY 2008 benefits estimates

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.

  3. Appendix G: Building Technologies Program inputs for FY 2008 benefits estimates

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.

  4. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    International Nuclear Information System (INIS)

    1980-01-01

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  5. Present status of refining and conversion facility dismantling. Progress in latter half of 2008FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Takahashi, Nobuo; Tokuyasu, Takashi

    2010-01-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2008FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room/each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  6. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  7. FY16-20 Strategic Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Harwell, Amber Suzanne [Sandia National Lab. (SNL-CA), Livermore, CA (United States)

    2015-07-01

    Welcome to our FY16–FY20 Strategic Plan, which both refects our continued dedication to the work we do and reinforces the importance of the integrated Laboratories’ strategic framework to our future. This document is the result of the leadership team’s journey over the past few years in response to the needs of our nation. In an external environment that continues to change, sometimes in unexpected ways, it is critical that our mission areas and our foundation become increasingly synergistic, forming a whole whose parts are interdependent.

  8. LDRD FY 2014 Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  9. FY1983 HTGR summary level program plan

    International Nuclear Information System (INIS)

    1983-01-01

    The major focus and priority of the FY1983 HTGR Program is the development of the HTGR-SC/C Lead Project through one of the candidate lead utilities. Accordingly, high priority will be given to work described in WBS 04 for site and user specific studies toward the development of the Lead Project. Asessment of advanced HTGR systems will continue during FY1983 in accordance with the High Temperature Process Heat (HTPH) Concept Evaluation Plan. Within the context of that plan, the assessment of the monolithic HTPH concepts has been essentially completed in FY1982 and FY1983 activities and will be limited to documentation only. the major advanced HTGR systems efforts in FY1983 will be focused on the further definition of the Modular Reactor Systems concepts in both the reforming (MRS-R) and Steam Cycle/Cogeneration 9MRS-SC/C) configurations in WBS 41. The effort will concentrate upon key technical issues and trade studies oriented to reduction in expected cost and schedule duration. With regard to the latter, the most significant will be trade study addressing the degree of modularization of reactor plant structures. particular attention will be given to the confinement building which currently defines the critical path for construction

  10. Summaries of research and development activities by using JAERI computer system in FY2004 (April 1, 2004 - March 31, 2005)

    International Nuclear Information System (INIS)

    2005-08-01

    Center for Promotion of Computational Science and Engineering (CCSE) of Japan Atomic Energy Research Institute (JAERI) installed large computer systems including super-computers in order to support research and development activities in JAERI. CCSE operates and manages the computer system and network system. This report presents usage records of the JAERI computer system and the big users' research and development activities by using the computer system in FY2004 (April 1, 2004 - March 31, 2005). (author)

  11. Laboratory Directed Research and Development Program FY2004

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Todd C.

    2005-03-22

    The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab or LBNL) is a multi-program national research facility operated by the University of California for the Department of Energy (DOE). As an integral element of DOE's National Laboratory System, Berkeley Lab supports DOE's missions in fundamental science, energy resources, and environmental quality. Berkeley Lab programs advance four distinct goals for DOE and the nation: (1) To perform leading multidisciplinary research in the computing sciences, physical sciences, energy sciences, biosciences, and general sciences in a manner that ensures employee and public safety and protection of the environment. (2) To develop and operate unique national experimental facilities for qualified investigators. (3) To educate and train future generations of scientists and engineers to promote national science and education goals. (4) To transfer knowledge and technological innovations and to foster productive relationships among Berkeley Lab's research programs, universities, and industry in order to promote national economic competitiveness. Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Goals that are codified in DOE's September 2003 Strategic Plan, with a primary focus on Advancing Scientific Understanding. For that goal, the Fiscal Year (FY) 2004 LDRD projects support every one of the eight strategies described in the plan. In addition, LDRD efforts support the goals of Investing in America's Energy Future (six of the fourteen strategies), Resolving the Environmental Legacy (four of the eight strategies), and Meeting National Security Challenges (unclassified fundamental research that supports stockpile safety and nonproliferation programs). The LDRD supports Office of Science strategic plans, including the 20 year Scientific Facilities Plan and the draft Office of Science Strategic Plan. The research also

  12. FY 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  13. Report of interim evaluation of Horonobe Underground Research Project Plan in FY2004

    International Nuclear Information System (INIS)

    2005-09-01

    The research results on the ground in the first step, until 2004 FY, and the research program of drift work in the second step are evaluated. On the first step, development of the geological environment research technologies, the monitoring technologies and the basic engineering technologies in the deep underground, long period stability of geological environment, and improvement of the geological disposal technologies, and the stability evaluation methods are investigated and these research results were high in estimation. The research program in the second step contains to obtain the geological environment data at sinking shaft, the effects of sinking on the geological environment, validity of the geological environment model in the first step and around the shaft are estimated. Validity of monitoring technologies of geological environment on the ground, engineering technologies of work, maintenance and management of shaft are evaluated. The fault, upheaval, submergence, change of sea level and climate are determined by earthquakes measurements, GPS and time-stratigraphic classification. The geological disposal technologies are improved by storage of data, better model and verification of engineering element techniques. Test program of materials transition in the geological disposal system is work out. (S.Y.)

  14. 75 FR 15686 - NOAA'S Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015

    Science.gov (United States)

    2010-03-30

    ...-01] NOAA'S Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015 AGENCY... and Atmospheric Administration (NOAA), Commerce. ACTION: Notice of availability and request for public comment. [[Page 15687

  15. FY 2004 Scientific and Technical Reports, Articles, Papers, and Presentations

    Science.gov (United States)

    Fowler, B. A. (Compiler)

    2006-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel FY 2004. It also includes papers of MSFC contractors. After being announced in STAR, all NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this TM maybe of value to the scientific and engineering community in determining what information has been published and what is available.

  16. FY 1993 task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1991-10-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to individuals and populations. The primary objective of work to be performed in FY 1993 is to complete the source term estimates and dose estimates for key radionuclides for the air and river pathways. At the end of FY 1993, the capability will be in place to estimate doses for individuals in the extended (32-county) study area, 1944--1991. Native American research will continue to provide input for tribal dose estimates. In FY 1993, the Technical Steering Panel (TSP) will decide whether demographic and river pathways data collection should be extended beyond FY 1993 levels. The FY 1993 work scopes and milestones in this document are based on the work plan discussed at the TSP Budget/Fiscal Subcommittee meeting on August 19--20, 1991. Table 1 shows the FY 1993 milestones; Table 2 shows estimated costs. The subsequent work scope descriptions are based on the milestones. This document and the FY 1992 task plans will form the basis for a contract with Battelle and the Centers for Disease Control (CDC). The 2-year dose reconstruction contract is expected to begin in February 1992. This contract will replace the current arrangement, whereby the US Department of Energy directly funds the Pacific Northwest Laboratory to conduct dose reconstruction work. In late FY 1992, the FY 1993 task plans will be more fully developed with detailed technical approaches, data quality objectives, and budgeted labor hours. The task plans will be updated again in July 1993 to reflect any scope, milestone, or cost changes directed during the year by the TSP. 2 tabs

  17. FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-03-01

    This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements and challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of

  18. I-NERI 2004 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2004-01-01

    The International Nuclear Energy Research Initiative (I-NERI) supports the National Energy Policy by conducting research to advance the state of nuclear science and technology in the United States (U.S.). I-NERI sponsors innovative scientific and engineering research and development (R&D) in cooperation with participating countries. The R&D research performed under the I-NERI umbrella addresses the key issues affecting the future of nuclear energy and its global deployment. I-NERI research is directed towards improving cost performance, increasing proliferation resistance, enhancing safety, and improving the waste management of future nuclear energy systems. This I-NERI 2004 Annual Report serves to inform interested parties on the program's organization, progress of the collaborative research projects, and future planning for the program. The report covers the four years of I-NERI activity since the program's inception in fiscal year (FY) 2001. The motivation and series of events that led to the creation of the I-NERI program are discussed in Section 2. The participating countries in current I-NERI collaborative agreements are also presented. Section 3 presents an overview of the I-NERI goals and objectives, a work scope summary for the collaborative projects, and a summary of research project awards through the end of FY 2004. It also includes FY 2005 accomplishments and planned FY 2005 activities. A summary of programmatic accomplishments is presented in Section 4. Also included is a summary of new and existing projects, an overview of the I-NERI program funding, and the new collaborations anticipated in FY 2005. The R&D work scope for current I-NERI collaborative projects with Canada, France, Japan, the Organization for Economic Cooperation and Development/Nuclear Energy Agency (OECD/NEA), and the Republic of Korea are presented in Sections 5 through 9, respectively. For each participating country, an index of projects and a summary of FY 2004

  19. Nuclear medical inpatient treatment in Germany. Analysis of the structured quality reports 2004 to 2008; Stationaere nuklearmedizinische Therapie in Deutschland. Analyse der strukturierten Qualitaetsberichte 2004 bis 2008

    Energy Technology Data Exchange (ETDEWEB)

    Lorenz, R.; Reiners, C. [Universitaetsklinikum Wuerzburg (Germany). Klinik und Poliklinik fuer Nuklearmedizin; Dietlein, M. [Koeln Univ. (Germany). Klinik und Poliklinik fuer Nuklearmedizin

    2010-07-01

    All public licensed hospitals of Germany are obligated since 2004 to establish and to publish a structured biennial quality report. The aim of this study was to analyse the quality reports from 2008 of clinics with nuclear-medicine therapy ward and to investigate developments for the inpatient nuclear-medicine therapy by comparing the results with the quality reports of the years 2004 and 2006. Methods: All available structured quality reports of clinics with a nuclear-medicine therapy ward of the years 2004, 2006 and 2008 were evaluated. Results: The total number of inpatient treatment cases in 2008 amounted to 54 190 (2006: 54 884; 2004: 57 366). This corresponds to a decrease of 5.5% in comparison to 2004. The number of the therapy wards decreased at the same time to currently 117 (2006: 120; 2004: 124). Remarkable changes were found in the spectrum of the main diagnosis. Thus, the most frequent diagnosis with the ICD-code E05 (hyperthyroidism) decreased continuously from 37 747 treatments in 2004 and 34 764 in 2006 to 31 756 in the year 2008. In contrast, the ICD-diagnoses for thyroid cancer (C73, Z08) with 14 761 cases in 2008 increased with time (2006: 13 426; 2004: 12 581). Conclusions: In analogy to the observations from Europe after introduction of an iodine prophylaxis the improved iodine supply in Germany has led to a decline of the radioiodine therapy due to hyperthyroidism.

  20. High performance computing and communications: FY 1997 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A provides a detailed look at HPCC Program activities within each agency.

  1. Appendix J: Weatherization and Intergovernmental Program (WIP) inputs for FY 2008 benefits estimates

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.

  2. Edirne merkez ilçede prematür ölümler, 2004 ve 2008/Premature mortality in provincial center of Edirne, 2004 and 2008

    Directory of Open Access Journals (Sweden)

    Muzaffer Eskiocak

    2014-04-01

    Full Text Available ÖzetAmaç: Bu çalışmada; Edirne Merkez ilçe ve bağlı köylerde 2004 ve 2008 yıllarında olan prematür ölüm nedenlerini ve bu ölümlere bağlı oluşan potansiyel yaşam yılı kayıplarını belirlemek amaçlanmıştır. Yöntem: Çalışma kesitsel bir araştırmadır. Edirne Merkez ilçe ve bağlı köylerde 2004 ve 2008 yılında meydana gelen ölümler mezarlık, hastane, belediye ve adli tabiplik kayıtlarından derlenmiştir. Ölümler zaman, yer, cinsiyet ve nedenlerine yönelik olarak incelenmiştir. Prematür ölümlere bağlı oluşan Potansiyel Yaşam Yılı Kayıpları (PYYK, Years Potential Life Lost hesaplanmıştır. Bulgular: Edirne Merkez ilçede kaba ölüm hızı 2004 ve 2008 yıllarında sırasıyla binde 5.17 ve binde 5.48 olarak bulunmuştur. 65 yaş altında gerçekleşen ölümler prematür ölüm olarak değerlendirilmiştir. Prematür ölüm oranları 2004 yılında %34.9, 2008 yılında %35.5 olarak tespit edilmiştir. Prematür ölümlerin 2004 yılında %69.9’u, 2008 yılında %65.8’i erkek ölümleridir ve 2004 yılında %14.3’ü, 2008 yılında %8.1’i kırsalda gerçekleşmiştir. Prematür ölümlere bağlı PYYK 2004 yılında 4809 yıl, 2008 yılında 4929 yıldır. Her iki yılda prematür ölüme neden olan ilk beş ölüm nedeni; dolaşım sistemi hastalıkları, kanserler, iyi tanımlayan durumlar, kazalar, solunum sistemi hastalıklarıdır. Sonuç: Edirne Merkez ilçede prematür ölümler tüm ölümlerin yaklaşık üçte birini oluşturmaktadır ve en sık görülen prematür ölüm nedenleri dolaşım sistemi hastalıkları ve kanserlerdir.Anahtar Kelimeler: Prematür mortalite, potansiyel yaşam yılı kaybıAbstractObjective: This study determined the causes of premature mortalities, the potential years of life lost (PYLL and the economic losses due to premature mortality in the provincial centre of Edirne. Methods:This is a cross-sectional study. Mortality data in Edirne for the

  3. ANL site response for the DOE FY1994 information resources management long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  4. ANL site response for the DOE FY1994 information resources management long-range plan

    Energy Technology Data Exchange (ETDEWEB)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material. It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.

  5. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  6. United States home births increase 20 percent from 2004 to 2008.

    Science.gov (United States)

    MacDorman, Marian F; Declercq, Eugene; Mathews, T J

    2011-09-01

    After a gradual decline from 1990 to 2004, the percentage of births occurring at home increased from 2004 to 2008 in the United States. The objective of this report was to examine the recent increase in home births and the factors associated with this increase from 2004 to 2008. United States birth certificate data on home births were analyzed by maternal demographic and medical characteristics. In 2008, there were 28,357 home births in the United States. From 2004 to 2008, the percentage of births occurring at home increased by 20 percent from 0.56 percent to 0.67 percent of United States births. This rise was largely driven by a 28 percent increase in the percentage of home births for non-Hispanic white women, for whom more than 1 percent of births occur at home. At the same time, the risk profile for home births has been lowered, with substantial drops in the percentage of home births of infants who are born preterm or at low birthweight, and declines in the percentage of home births that occur to teen and unmarried mothers. Twenty-seven states had statistically significant increases in the percentage of home births from 2004 to 2008; only four states had declines. The 20 percent increase in United States home births from 2004 to 2008 is a notable development that will be of interest to practitioners and policymakers. (BIRTH 38:3 September 2011). © 2011, Copyright the Authors. Journal compilation © 2011, Wiley Periodicals, Inc.

  7. Human Factors Regulatory Research Program Plan, FY 1989--FY 1992

    International Nuclear Information System (INIS)

    Coffman, F.; Persensky, J.; Ryan, T.; Ramey-Smith, A.; Goodman, C.; Serig, D.; Trager, E; Nuclear Regulatory Commission, Washington, DC; Nuclear Regulatory Commission, Washington, DC; Nuclear Regulatory Commission, Washington, DC

    1989-10-01

    This report describes the currently ongoing (FY 1989) and planned (FY 1989-1992) Human Factors Regulatory Research Program in the NRC Office of Nuclear Regulatory Research (RES). Examples of the influence of human factors on nuclear safety are presented, and the role of personnel is discussed. Current regulatory issues associated with human factors in the nuclear system and the purpose of the research plan are provided. The report describes the research process applied to the human factors research issues and the program activities: Personnel Performance Measurement, Personnel Subsystem, Human-System Interface. Organization and Management, and Reliability Assessment. The research being conducted within each activity is summarized along with the objectives, background information, and expected regulatory products. Budget and personnel forecasts are provided along with a summary of contractors performing some of the ongoing research. Appendices contain a chronology of human factors research at NRC, a description of the research approach, an update on human factors programs and initiatives in RES and other NRC offices, and the integration among these programs. 46 refs., 5 tabs

  8. Integration of Nevada Test Site (NTS) Work Control Programs and Incorporating Integrated Safety Management (ISM) into Activity Level Work Planning and Control

    International Nuclear Information System (INIS)

    Kinney, Mike; Breen, Kevin

    2008-01-01

    This session will examine a method developed by Federal and Contractor personnel at the Nevada Site Office (NSO) to improve the planning and execution of work activities utilizing an Activity Level Work Control process in response to Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations. The process was initially developed during Fiscal Year (FY) 2007, and implementation is commencing during the fourth quarter of FY 2008. This process will significantly enhance the flexibility and the appropriate rigor in the performance of work activities

  9. Appendix F: FreedomCAR and Vehicle Technologies Program inputs for FY 2008 benefits estimates

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.

  10. W-519 Sagebrush Mitigation Project FY-2004 Final Review and Status

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2004-09-30

    This report summarizes activities conducted as mitigation for loss of sagebrush-steppe habitats due to Project W-519, the construction of the infrastructure for the Tank Waste Remediation System Vitrification Plant. The focus of this report is to provide a review and final status of mitigation actions performed through FY2004. Data collected since FY1999 have been included where appropriate. The Mitigation Action Plan (MAP) for Project W-519 prescribed three general actions to be performed as mitigation for the disturbance of approximately 40 ha (100 acres) of mature sagebrush-steppe habitat. These actions included: (1) transplanting approximately 130,000 sagebrush seedlings on the Fitzner-Eberhardt Arid Lands Ecology Reserve (ALE); (2) rectification of the new transmission line corridor via seeding with native grasses and sagebrush; and (3) research on native plant species with a goal of increasing species diversity in future mitigation or restoration actions. Nearly 130,000 Wyoming big sagebrush seedlings where planted on ALE during FY2000 and FY2001. About 39,000 of those seedlings were burned during the 24-Command Fire of June 2000. The surviving and subsequent replanting has resulted in about 91,000 seedlings that were planted across four general areas on ALE. A 50% survival rate at any monitoring period was defined as the performance standard in the MAP for this project. Data collected in 2004 indicate that of the over 5000 monitored plants, 51.1% are still alive, and of those the majority are thriving and blooming. These results support the potential for natural recruitment and the ultimate goal of wildlife habitat replacement. Thus, the basic performance standard for sagebrush survival within the habitat compensation planting has been met. Monitoring activities conducted in 2004 indicate considerable variation in seedling survival depending on the type of plant material, site conditions, and to a lesser extent, treatments performed at the time of planting

  11. W-519 Sagebrush Mitigation Project FY-2004 Final Review and Status

    International Nuclear Information System (INIS)

    Durham, Robin E.; Sackschewsky, Michael R.

    2004-01-01

    This report/SUMmarizes activities conducted as mitigation for loss of sagebrush-steppe habitats due to Project W-519, the construction of the infrastructure for the Tank Waste Remediation System Vitrification Plant. The focus of this report is to provide a review and final status of mitigation actions performed through FY2004. Data collected since FY1999 have been included where appropriate. The Mitigation Action Plan (MAP) for Project W-519 prescribed three general actions to be performed as mitigation for the disturbance of approximately 40 ha (100 acres) of mature sagebrush-steppe habitat. These actions included: (1) transplanting approximately 130,000 sagebrush seedlings on the Fitzner-Eberhardt Arid Lands Ecology Reserve (ALE); (2) rectification of the new transmission line corridor via seeding with native grasses and sagebrush; and (3) research on native plant species with a goal of increasing species diversity in future mitigation or restoration actions. Nearly 130,000 Wyoming big sagebrush seedlings where planted on ALE during FY2000 and FY2001. About 39,000 of those seedlings were burned during the 24-Command Fire of June 2000. The surviving and subsequent replanting has resulted in about 91,000 seedlings that were planted across four general areas on ALE. A 50% survival rate at any monitoring period was defined as the performance standard in the MAP for this project. Data collected in 2004 indicate that of the over 5000 monitored plants, 51.1% are still alive, and of those the majority are thriving and blooming. These results support the potential for natural recruitment and the ultimate goal of wildlife habitat replacement. Thus, the basic performance standard for sagebrush survival within the habitat compensation planting has been met. Monitoring activities conducted in 2004 indicate considerable variation in seedling survival depending on the type of plant material, site conditions, and to a lesser extent, treatments performed at the time of planting

  12. Voluntary research results for five years along the master plan on nuclear safety research. FY 2001 - 2005

    International Nuclear Information System (INIS)

    Sato, Yoshinori

    2006-05-01

    Safety Research has been conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005) in Japan Atomic Energy Agency which took over former Japan Nuclear Cycle Development Institute. This report shows the voluntary research results for five years conducted from FY 2001 to FY 2005 according to the Master Plan on Nuclear Safety Research (FY 2001-2005). (author)

  13. Westinghouse Hanford Company FY 1995 Materials Management Plan (MMP)

    International Nuclear Information System (INIS)

    Higginson, M.C.

    1994-10-01

    The safe and sound operation of facilities and storage of nuclear material are top priorities within Hanford's environmental management, site restoration mission. The projected materials estimates, based on the Materials Management Plan (MMP) assumptions outlined below, were prepared for Department of Energy (DOE) use in long-range planning. The Hanford MMP covers the period FY 1995 through FY 2005, as directed by DOE. All DOE Richland Operations (RL) Office facilities are essentially funded by the Office of Transition and Facilities Management, Environmental Restoration and Waste Management (EM). These facilities include PUREX, the UO 3 plant, N-Reactor, T-Plant, K-Basins, FFTF, PFP and the 300 Area Fuel Fabrication facilities. Currently DP provides partial funding for the latter two facilities. Beginning in FY 1996 (in accordance with DOE-HQ MMP assumptions), EM will fund expenses related to the storage, monitoring, and safeguarding of all Special Nuclear Material (SNM) in the PFP. Ownership and costs related to movement and/or stabilization of that material will belong to EM programs (excluding NE material). It is also assumed that IAEA will take over inventory validation and surveillance of EM owned SNM at this time (FY 1996)

  14. Institutional plan. FY 1997-2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The FY 1997-2002 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. Of particular significance this year is the role of computing sciences in supporting a broad range of research activities, at Berkeley Lab in particular and throughout the entire Department of Energy system in general. The Institutional Plan is a management report for integration with the Department of Energy`s mission and programs and is an element of Department of Energy`s strategic management planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives.

  15. High performance computing and communications: FY 1996 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  16. Appendix B: Hydrogen, Fuel Cells, and Infrastructure Technologies Program inputs for FY 2008 benefits estimates

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.

  17. FY95 software project management plan: TMACS, CASS computer systems

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The FY95 Work Plan for TMACS and CASS Software Projects describes the activities planned for the current fiscal year. This plan replaces WHC-SD-WM-SDP-008. The TMACS project schedule is included in the TWRS Integrated Schedule

  18. INEEL Institutional Plan - FY 2000-2004

    International Nuclear Information System (INIS)

    Enge, Ray Stevenson

    1999-01-01

    In this first Institutional Plan prepared by Bechtel BWXT Idaho, LLC, for the Idaho National Engineering and Environmental Laboratory, the INEEL will focus it's efforts on three strategic thrusts; (1) Environmental Management stewardship for DOE-EM, (2) Nuclear reactor technology for DOE-Nuclear Energy (NE), and (3) Energy R and D, demonstration, and deployment (initial focus on biofuels and chemical from biomass). The first strategic thrust focuses on meeting DOE-EM's environmental cleanup and long-term stewardship needs in a manner that is safe, cost-effective, science-based, and approved by key stakeholders. The science base at the INEEL will be further used to address a grand challenge for the INEEL and the DOE complex--the development of a fundamental scientific understanding of the migration of subsurface contaminants. The second strategic thrust is directed at DOE-NE's needs for safe, economical, waste-minimized, and proliferation-resistant nuclear technologies. As NE lead laboratories, the INEEL and ANL will pursue specific priorities. The third strategic thrust focuses on DOE's needs for clean, efficient, and renewable energy technology. As an initial effort, the INEEL will enhance its capability in biofuels, bioprocessing, and biochemicals. The content of this Institutional Plan is designed to meet basic DOE requirements for content and structure and reflect the key INEEL strategic thrusts. Updates to this Institutional Plan will offer additional content and resource refinements

  19. INEEL Institutional Plan - FY 2000-2004

    Energy Technology Data Exchange (ETDEWEB)

    Enge, Ray Stevenson

    1999-11-01

    In this first Institutional Plan prepared by Bechtel BWXT Idaho, LLC, for the Idaho National Engineering and Environmental Laboratory, the INEEL will focus it's efforts on three strategic thrusts; (1) Environmental Management stewardship for DOE-EM, (2) Nuclear reactor technology for DOE-Nuclear Energy (NE), and (3) Energy R&D, demonstration, and deployment (initial focus on biofuels and chemical from biomass). The first strategic thrust focuses on meeting DOE-EM's environmental cleanup and long-term stewardship needs in a manner that is safe, cost-effective, science-based, and approved by key stakeholders. The science base at the INEEL will be further used to address a grand challenge for the INEEL and the DOE complex - the development of a fundamental scientific understanding of the migration of subsurface contaminants. The second strategic thrust is directed at DOE-NE's needs for safe, economical, waste-minimized, and proliferation-resistant nuclear technologies. As NE lead laboratories, the INEEL and ANL will pursue specific priorities. The third strategic thrust focuses on DOE's needs for clean, efficient, and renewable energy technology. As an initial effort, the INEEL will enhance its capability in biofuels, bioprocessing, and biochemicals. The content of this Institutional Plan is designed to meet basic DOE requirements for content and structure and reflect the key INEEL strategic thrusts. Updates to this Institutional Plan will offer additional content and resource refinements.

  20. Institutional Plan FY 2001-2005

    Energy Technology Data Exchange (ETDEWEB)

    Chartock, Michael; Hansen, Todd, editors

    2000-07-01

    The FY 2001-2005 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.

  1. Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Will [comp.

    2006-09-01

    The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did an exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.

  2. High performance computing and communications: FY 1995 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  3. Laboratory Directed Research and Development Program FY 2004 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Sjoreen, Terrence P [ORNL

    2005-04-01

    The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2A, 'Laboratory Directed Research and Development' (January 8, 2001), which establishes DOE's requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report describes all ORNL LDRD research activities supported during FY 2004 and includes final reports for completed projects and shorter progress reports for projects that were active, but not completed, during this period. The FY 2004 ORNL LDRD Self-Assessment (ORNL/PPA-2005/2) provides financial data about the FY 2004 projects and an internal evaluation of the program's management process. ORNL is a DOE multiprogram science, technology, and energy laboratory with distinctive capabilities in materials science and engineering, neutron science and technology, energy production and end-use technologies, biological and environmental science, and scientific computing. With these capabilities ORNL conducts basic and applied research and development (R&D) to support DOE's overarching national security mission, which encompasses science, energy resources, environmental quality, and national nuclear security. As a national resource, the Laboratory also applies its capabilities and skills to the specific needs of other federal agencies and customers through the DOE Work For Others (WFO) program. Information about the Laboratory and its programs is available on the Internet at . LDRD is a relatively small but vital DOE program that allows ORNL, as well as other multiprogram DOE laboratories, to select a limited number of R&D projects for the purpose of: (1) maintaining the scientific and technical vitality of the

  4. 78 FR 15960 - Request for Information on the FY 2013-2018 Strategic Plan for the Office of Disease Prevention

    Science.gov (United States)

    2013-03-13

    ... Office has embarked on an extensive planning process to develop a strategic plan for FY 2013-2018... the FY 2013-2018 Strategic Plan for the Office of Disease Prevention SUMMARY: The purpose of this Request for Information (RFI) is to seek broad public input on the Fiscal Year (FY) 2013-2018 Strategic...

  5. 76 FR 13353 - Department of Commerce FY 2011-2016 Strategic Plan

    Science.gov (United States)

    2011-03-11

    ... performance measures (i.e., GPRA measures) for tracking attainment. The Department's Strategic Plan is...-2016 Strategic Plan AGENCY: Department of Commerce. ACTION: Request for comment. SUMMARY: The Department of Commerce (Department) is updating its current FY 2007-2012 Strategic Plan. As part of this...

  6. Analysis of traffic crash data in Kentucky : 2004-2008.

    Science.gov (United States)

    2009-09-01

    The report documents an analysis of traffic crash data in Kentucky for the years of 2004 through 2008. A primary objective of this study was to determine average crash statistics for Kentucky highways. Average and critical numbers and rates of crashe...

  7. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    International Nuclear Information System (INIS)

    1998-03-01

    Consistent with the Environmental Management's (EM's) plan titled, ''Accelerating Cleanup: Paths to Closure'', and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided

  8. Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Consistent with the Environmental Management`s (EM`s) plan titled, ``Accelerating Cleanup: Paths to Closure``, and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided.

  9. FMCSA safety program effectiveness measurement : compliance review effectiveness model results for carriers with compliance reviews in FY 2008

    Science.gov (United States)

    2012-09-30

    In FY 2008, Federal and State enforcement personnel conducted 14,906 compliance reviews (CRs) on individual motor carriers. It is intended that through education, heightened safety regulation awareness, and the enforcement effects of the CR, carriers...

  10. Biofuels Program Plan, FY 1992--FY 1996. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    This five-year program plan describes the goals and philosophy of the US Department of Energy`s (DOE) Biofuels Systems Division (BSD) program and the BSD`s major research and development (R&D) activities for fiscal years (FY) 1992 through 1996. The plan represents a consensus among government and university researchers, fuel and automotive manufacturers, and current and potential users of alternative fuels and fuel additives produced from biomass. It defines the activities that are necessary to produce versatile, domestic, economical, renewable liquid fuels from biomass feedstocks. The BSD program focuses on the production of alternative liquid fuels for transportation-fuels such as ethanol, methanol, biodiesel, and fuel additives for reformulated gasoline. These fuels can be produced from many plant materials and from a significant portion of the wastes generated by municipalities and industry. Together these raw materials and wastes, or feedstocks, are called biomass.

  11. Hood River and Pelton Ladder Evaluation Studies, 2008 Annual Report : October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Reagan, Robert E.; Olsen, Erik A. [Oregon Department of Fish and Wildlife

    2009-09-28

    This report summarizes the life history and production data collected in the Hood River subbasin during FY 2008. Included is a summary of jack and adult life history data collected at the Powerdale Dam trap on seventeen complete run years of winter steelhead, spring and fall chinook salmon, and coho salmon, and on fifteen complete run years of summer steelhead. Also included are summaries of (1) the hatchery winter steelhead broodstock collection program; (2) hatchery production releases in the Hood River subbasin; (3) subbasin wild summer and winter steelhead smolt production, (4) numbers of hatchery summer and winter steelhead smolts leaving the subbasin; (5) smolt migration timing past Bonneville Dam, (6) wild and hatchery steelhead smolt-to-adult survival rates; (7) wild summer and winter steelhead egg to smolt survival rates; and (8) streamflow at selected locations in the Hood River subbasin. Data will be used in part to (1) evaluate the HRPP relative to its impact on indigenous populations of resident and anadromous salmonids (see Ardren Draft), (2) evaluate the HRPP's progress towards achieving the biological fish objectives defined in the Hood River Subbasin Plan (Coccoli 2004) and the Revised Master Plan for the Hood River Production Program (HDR|FishPro, ODFW, and CTWSRO 2008), (3) refine spawner escapement objectives to more accurately reflect subbasin carrying capacity, and (4) refine estimates of subbasin smolt production capacity to more accurately reflect current and potential subbasin carrying capacity.

  12. FY 1992 task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    1991-10-01

    Phase 1 of the HEDR Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations from limited radionuclides, in a limited geographical area and time period. Phase 1 ended in FY 1990. In February 1991, the TSP decided to shift the project planning approach away from phases--which were centered around completion of major portions of technical activities--to individual fiscal years (FYs), which span October of one year through September of the next. Therefore, activities that were previously designated to occur in phases are now designated in an integrated schedule to occur in one or more of the next fiscal years into FY 1995. Task plans are updated every 6 months. In FY 1992, scientists will continue to improve Phase 1 data and models to calculate more accurate and precise dose estimates. The plan for FY 1992 has been prepared based on activities and budgets approved by the Technical Steering Panel (TSP) at its meeting on August 19--20, 1991. The activities can be divided into four categories: (1) model and data evaluation activities, (2) additional dose estimates, (3) model and data development activities, and (4) technical and communication support. 3 figs., 2 tabs

  13. Utilisation of podiatry services in Australia under the Medicare Enhanced Primary Care program, 2004-2008.

    Science.gov (United States)

    Menz, Hylton B

    2009-10-30

    In 2004, as an extension of the Enhanced Primary Care (EPC) program, the Australian Government introduced a policy of providing Medicare rebates for allied health services provided to patients with chronic or complex health conditions. The objective of this study was to evaluate the utilisation of podiatry services provided under this scheme between 2004 and 2008. Data pertaining to the Medicare item 10962 for the calendar years 2004-2008 were extracted from the Australian Medicare Benefits Schedule (MBS) database and cross-tabulated by sex and age. Descriptive analyses were undertaken to assess sex and age differences in the number of consultations provided and to assess for temporal trends over the five-year assessment period. The total cost to Medicare over this period was also determined. During the 2004-2008 period, a total of 1,338,044 EPC consultations were provided by podiatrists in Australia. Females exhibited higher utilisation than males (63 versus 37%), and those aged over 65 years accounted for 75% of consultations. There was a marked increase in the number of consultations provided from 2004 to 2008, and the total cost of providing EPC podiatry services during this period was $62.9 M. Podiatry services have been extensively utilised under the EPC program by primary care patients, particularly older women, and the number of services provided has increased dramatically between 2004 and 2008. Further research is required to determine whether the EPC program enhances clinical outcomes compared to standard practice.

  14. Utilisation of podiatry services in Australia under the Medicare Enhanced Primary Care program, 2004-2008

    Directory of Open Access Journals (Sweden)

    Menz Hylton B

    2009-10-01

    Full Text Available Abstract Background In 2004, as an extension of the Enhanced Primary Care (EPC program, the Australian Government introduced a policy of providing Medicare rebates for allied health services provided to patients with chronic or complex health conditions. The objective of this study was to evaluate the utilisation of podiatry services provided under this scheme between 2004 and 2008. Methods Data pertaining to the Medicare item 10962 for the calendar years 2004-2008 were extracted from the Australian Medicare Benefits Schedule (MBS database and cross-tabulated by sex and age. Descriptive analyses were undertaken to assess sex and age differences in the number of consultations provided and to assess for temporal trends over the five-year assessment period. The total cost to Medicare over this period was also determined. Results During the 2004-2008 period, a total of 1,338,044 EPC consultations were provided by podiatrists in Australia. Females exhibited higher utilisation than males (63 versus 37%, and those aged over 65 years accounted for 75% of consultations. There was a marked increase in the number of consultations provided from 2004 to 2008, and the total cost of providing EPC podiatry services during this period was $62.9 M. Conclusion Podiatry services have been extensively utilised under the EPC program by primary care patients, particularly older women, and the number of services provided has increased dramatically between 2004 and 2008. Further research is required to determine whether the EPC program enhances clinical outcomes compared to standard practice.

  15. Savannah River Site FY 1998 Spent Nuclear Fuel Interim Management Plan

    International Nuclear Information System (INIS)

    Dupont, M.E.

    1998-01-01

    This document has been prepared to present in one place the near and long-term plans for safe management of Savannah River Site (SRS) spent nuclear fuel inventories until final disposition has been identified and implemented. The activities described are consistent with FY 1998 Annual Operational Plan guidance and with the December 1997 SRS Accelerated Cleanup Plan update. Summarized are highlights, key decision dates, and baseline assumptions of this plan

  16. Pacific Northwest National Laboratory Institutional Plan FY 2001-2005

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, Darrell R.; Pearson, Erik W.

    2000-12-29

    The Pacific Northwest National Laboratory Institutional Plan for FY 2001-2005 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; managaement procatices and standards; and communications and trust.

  17. Buried Waste Integrated Demonstration FY-95 Deployment Plan

    Energy Technology Data Exchange (ETDEWEB)

    Stacey, D.E.

    1995-03-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The FY-95 effort will fund 24 technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. Ten of these technologies will take part in the integrated field demonstration that will take place at the Idaho National Engineering Laboratory (INEL) facilities in the summer of 1995. This document is the basic operational planning document for deployment of all BWID projects funded in FY-95. Discussed in this document are the BWID preparations for the INEL integrated field demonstration, INEL research and development (R&D) demonstrations, non-INEL R&D demonstrations, and office research and technical review meetings. Each project will have a test plan detailing the specific procedures, objectives, and tasks of the test. Therefore, information that is specific to testing each technology is intentionally limited in this document.

  18. Buried Waste Integrated Demonstration FY-95 Deployment Plan

    International Nuclear Information System (INIS)

    Stacey, D.E.

    1995-03-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The FY-95 effort will fund 24 technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. Ten of these technologies will take part in the integrated field demonstration that will take place at the Idaho National Engineering Laboratory (INEL) facilities in the summer of 1995. This document is the basic operational planning document for deployment of all BWID projects funded in FY-95. Discussed in this document are the BWID preparations for the INEL integrated field demonstration, INEL research and development (R ampersand D) demonstrations, non-INEL R ampersand D demonstrations, and office research and technical review meetings. Each project will have a test plan detailing the specific procedures, objectives, and tasks of the test. Therefore, information that is specific to testing each technology is intentionally limited in this document

  19. Argonne National Laboratory institutional plan FY 2002 - FY 2007

    International Nuclear Information System (INIS)

    Beggs, S. D.

    2001-01-01

    The national laboratory system provides a unique resource for addressing the national needs inherent in the mission of the Department of Energy. Argonne, which grew out of Enrico Fermi's pioneering work on the development of nuclear power, was the first national laboratory and, in many ways, has set the standard for those that followed. As the Laboratory's new director, I am pleased to present the Argonne National Laboratory Institutional Plan for FY 2002 through FY 2007 on behalf of the extraordinary group of scientists, engineers, technicians, administrators, and others who re responsible for the Laboratory's distinguished record of achievement. Like our sister DOE laboratories, Argonne uses a multifaceted approach to advance U.S. R and D priorities. First, we assemble interdisciplinary teams of scientists and engineers to address complex problems. For example, our initiative in Functional Genomics will bring together biologists, computer scientists, environmental scientists, and staff of the Advanced Photon Source to develop complete maps of cellular function. Second, we cultivate specific core competencies in science and technology; this Institutional Plan discusses the many ways in which our core competencies support DOE's four mission areas. Third, we serve the scientific community by designing, building, and operating world-class user facilities, such as the Advanced Photon Source, the Intense Pulsed Neutron Source, and the Argonne Tandem-Linac Accelerator System. This Plan summarizes the visions, missions, and strategic plans for the Laboratory's existing major user facilities, and it explains our approach to the planned Rare Isotope Accelerator. Fourth, we help develop the next generation of scientists and engineers through educational programs, many of which involve bright young people in research. This Plan summarizes our vision, objectives, and strategies in the education area, and it gives statistics on student and faculty participation. Finally, we

  20. NERI 2004 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2004-01-01

    The United States Department of Energy (DOE) created the Nuclear Energy Research Initiative (NERI) in Fiscal Year (FY) 1999 in response to recommendations provided by the President's Committee of Advisors on Science and Technology. The purpose of NERI is to sponsor research and development (R&D) in the nuclear energy sciences to address the principal barriers to the future use of nuclear energy in the United States. NERI is helping to preserve the nuclear science and engineering infrastructure within the Nation's universities, laboratories, and industry, and is advancing the development of nuclear energy technology, enabling the United States to maintain a competitive position in nuclear science and technology. Research under this initiative also addresses issues associated with the maintenance of existing U.S. nuclear plants. The NERI program is managed and funded by DOE's Office of Nuclear Energy, Science and Technology. ''The Nuclear Energy Research Initiative 2004 Annual Report'' serves to inform interested parties of progress made in NERI on a programmatic level as well as research progress made on individual NERI projects. Section 2 of this report provides background on the creation and implementation of NERI and on the focus areas for NERI research. Section 3 provides a discussion on NERI's mission, goals and objectives, and work scope. Section 4 highlights the major accomplishments of the NERI projects and provides brief summaries of the NERI research efforts that were completed in 2004. Section 5 provides a discussion on the impact NERI has had on U.S. university nuclear programs. Sections 6 through 8 provide project status reports by research area for each of the fiscal year (FY) 2001 and 2002 projects that were active in FY 2004. Research objectives, progress made over the last year, and activities planned for the next year are described for each project. Sections 9 through 11 present each of the newly awarded 2005

  1. Institutional Plan, FY 1993--1998, Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    1993-01-01

    This document presents the plans and goals of the Idaho National Engineering Laboratory for FY 1993--1998. Areas discussed in this document include: INEL strategic view; initiatives; scientific and technical programs; environmental, safety, and health management, technology transfer, science and math education, and community affairs; human resources; site and facilities; and resource projections

  2. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    International Nuclear Information System (INIS)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission's (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency's strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended

  3. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  4. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  5. Test plan for FY-94 digface characterization field experiments

    International Nuclear Information System (INIS)

    Josten, N.E.; Roybal, L.G.

    1994-08-01

    The digface characterization concept has been under development at the Idaho National Engineering Laboratory (INEL) since fiscal year (FY) 1992 through the support of the Buried Waste Integrated Demonstration Program. A digface characterization system conducts continuous subsurface characterization simultaneously with retrieval of hazardous and radioactive waste from buried waste sites. The system deploys multiple sensors at the retrieval operation digface and collects data that provide a basis for detecting, locating, and classifying buried materials and hazardous conditions before they are disturbed by the retrieval equipment. This test plan describes ongoing efforts to test the digface characterization concept at the INEL's Cold Test Pit using a simplified prototype deployment apparatus and off-the-shelf sensors. FY-94 field experiments will explore problems in object detection and classification. Detection and classification of objects are fundamental to three of the four primary functions of digface characterization during overburden removal. This test plan establishes procedures for collecting and validating the digface characterization data sets. Analysis of these data will focus on testing and further developing analysis methods for object detection and classification during overburden removal

  6. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  7. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  8. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.

  9. Smoke-free-home rules among women with infants, 2004-2008.

    Science.gov (United States)

    Gibbs, Falicia A; Tong, Van T; Farr, Sherry L; Dietz, Patricia M; Babb, Stephen

    2012-01-01

    Exposure to secondhand smoke increases risk for infant illness and death. The objective of this study was to estimate the prevalence of complete smoke-free-home rules (smoking not allowed anywhere in the home) among women with infants in the United States. We analyzed 2004-2008 data from the Pregnancy Risk Assessment Monitoring System on 41,535 women who had recent live births in 5 states (Arkansas, Maine, New Jersey, Oregon, and Washington). We calculated the prevalence of complete smoke-free-home rules and partial or no rules by maternal smoking status, demographic characteristics, delivery year, and state of residence. We used adjusted prevalence ratios (APRs) to estimate associations between complete rules and partial or no rules and variables. During 2004-2008, the overall prevalence of complete rules was 94.6% (95% confidence interval [CI], 94.4-94.9), ranging from 85.4% (Arkansas) to 98.1% (Oregon). The prevalence of complete rules increased significantly in 3 states from 2004 to 2008. It was lowest among women who smoked during pregnancy and postpartum, women younger than 20 years, non-Hispanic black women, women with fewer than 12 years of education, women who had an annual household income of less than $10,000, unmarried women, and women enrolled in Medicaid during pregnancy. The prevalence of complete smoke-free-home rules among women with infants was high overall and increased in 3 of 5 states, signifying a public health success. Sustained and targeted efforts among groups of women who are least likely to have complete smoke-free-home rules are needed to protect infants from exposure to secondhand smoke.

  10. 2004/2008 labour market information comparative analysis report

    International Nuclear Information System (INIS)

    2009-01-01

    The electricity sector has entered into a phase of both challenges and opportunities. Challenges include workforce retirement, labour shortages, and increased competition from other employers to attract and retain the skilled people required to deliver on the increasing demand for electricity in Canada. The electricity sector in Canada is also moving into a new phase, whereby much of the existing infrastructure is either due for significant upgrades, or complete replacement. The increasing demand for electricity means that increased investment and capital expenditure will need to be put toward building new infrastructure altogether. The opportunities for the electricity industry will lie in its ability to effectively and efficiently react to these challenges. The purpose of this report was to provide employers and stakeholders in the sector with relevant and current trend data to help them make appropriate policy and human resource decisions. The report presented a comparative analysis of a 2004 Canadian Electricity Association employer survey with a 2008 Electricity Sector Council employer survey. The comparative analysis highlighted trends and changes that emerged between the 2004 and 2008 studies. Specific topics that were addressed included overall employment trends; employment diversity in the sector; age of non-support staff; recruitment; and retirements and pension eligibility. Recommendations were also offered. It was concluded that the electricity sector could benefit greatly from implementing on-going recruitment campaigns. refs., tabs., figs

  11. Salt Repository Project. FY-84 technical project plan

    International Nuclear Information System (INIS)

    1984-08-01

    The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask

  12. Savannah River Site FY 2001 Spent Nuclear Fuel Integrated Management Plan

    International Nuclear Information System (INIS)

    Dunsmuir, M.D.

    2000-01-01

    This document presents the SRS integrated near and long-term plans (FY 2001 through 2035) for the safe life cycle management of SNF inventories and other SFSD legacy material programs/projects that impact this mission until final disposition has been implemented

  13. Temporal changes in stress preceding the 2004-2008 eruption of Mount St. Helens, Washington

    Science.gov (United States)

    Lehto, H.L.; Roman, D.C.; Moran, S.C.

    2010-01-01

    The 2004-2008 eruption of Mount St. Helens (MSH), Washington, was preceded by a swarm of shallow volcano-tectonic earthquakes (VTs) that began on September 23, 2004. We calculated locations and fault-plane solutions (FPS) for shallow VTs recorded during a background period (January 1999 to July 2004) and during the early vent-clearing phase (September 23 to 29, 2004) of the 2004-2008 eruption. FPS show normal and strike-slip faulting during the background period and on September 23; strike-slip and reverse faulting on September 24; and a mixture of strike-slip, reverse, and normal faulting on September 25-29. The orientation of ??1 beneath MSH, as estimated from stress tensor inversions, was found to be sub-horizontal for all periods and oriented NE-SW during the background period, NW-SE on September 24, and NE-SW on September 25-29. We suggest that the ephemeral ~90?? change in ??1 orientation was due to intrusion and inflation of a NE-SW-oriented dike in the shallow crust prior to the eruption onset. ?? 2010 Elsevier B.V.

  14. Nevada nuclear waste storage investigations: FY 1980 Project Plan and FY 1981 forecast

    International Nuclear Information System (INIS)

    1980-02-01

    The DOE is responsible for developing or improving the technology for safely and permanently isolating radioactive wastes from the biosphere. The National Waste Terminal Storage Program, which is a part of the US Nuclear Waste Management Program, is concerned with disposing of the high-level wastes associated with DOE and commercial nuclear reactor fuel cycles. The DOE/NV has been delegated the responsibility to evaluate the geohydrologic setting and underground rock masses of the Nevada Test Site (NTS) area to determine whether a suitable site exists for constructing a repository for isolating highly radioactive solid wastes. Accordingly, the Nevada Nuclear Waste Storage Investigations (NNWSI) were established by NV to conduct these evaluations. The NNWSI are managed by the DOE/NV, but the field and laboratory investigations are being performed by scientific investigators from several organizations. The four primary organizations involved are: Los Alamos Scientific Laboratory (LASL), Lawrence Livermore Laboratory (LLL), Sandia Laboratories (SL), and the US Geological Survey (USGS). DOE/NV is responsible for coordinating these investigations. This document presents the Project Plan for the NNWSI for FY 1980 and forecasts activities for FY 1981. Each task is divided into subtasks and described. This Plan is subject ot periodic review and revision by the DOE/NV. Changes will be addressed as they occur in NNWSI Quarterly Reports. This document also presents information on the Project's technical approach as well as its history, organization, and management

  15. FY85 Program plan for the Defense Transuranic Waste Program (DTWP)

    International Nuclear Information System (INIS)

    1984-11-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY85 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Research and Development (R and D), the organizational interfaces and communication channels for R and D and the establishment of procedures for planning, reporting, and budgeting of all R and D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. The Program Plan is revised as needed. The work breakdown structure is reflected graphically immediately following the Administration section and is described in the subsequent narrative. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY85; outyear budget projections are presented for future years

  16. Health insurance premium increases for the 5 largest school districts in the United States, 2004-2008.

    Science.gov (United States)

    Cantillo, John R

    2010-03-01

    Local school districts are often one of the largest, if not the largest, employers in their respective communities. Like many large employers, school districts offer health insurance to their employees. There is a lack of information about the rate of health insurance premiums in US school districts relative to other employers. To assess the change in the costs of healthcare insurance in the 5 largest public school districts in the United States, between 2004 and 2008, as representative of large public employers in the country. Data for this study were drawn exclusively from a survey sent to the 5 largest public school districts in the United States. The survey requested responses on 3 data elements for each benefit plan offered from 2004 through 2008; these included enrollment, employee costs, and employer costs. The premium growth for the 5 largest school districts has slowed down and is consistent with other purchasers-Kaiser/Health Research & Educational Trust and the Federal Employee Health Benefit Program. The average increase in health insurance premium for the schools was 5.9% in 2008, and the average annual growth rate over the study period was 7.5%. For family coverage, these schools provide the most generous employer contribution (80.8%) compared with the employer contribution reported by other employers (73.5%) for 2008. Often the largest employers in their communities, school districts demonstrate a commitment to provide choice of benefits and affordability for employees and their families. Despite constraints typical of public employers, the 5 largest school districts in the United States have decelerated in premium growth consistent with other purchasers, albeit at a slower pace.

  17. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    International Nuclear Information System (INIS)

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections

  18. Laboratory Directed Research and Development FY2008 Annual Report

    International Nuclear Information System (INIS)

    Kammeraad, J.E.; Jackson, K.J.; Sketchley, J.A.; Kotta, P.R.

    2009-01-01

    , industry, and other scientific and research institutions. By keeping the Laboratory at the forefront of science and technology, the LDRD Program enables us to meet our mission challenges, especially those of our ever-evolving national security mission. The Laboratory Directed Research and Development (LDRD) annual report for fiscal year 2008 (FY08) provides a summary of LDRD-funded projects for the fiscal year and consists of two parts: A broad description of the LDRD Program, the LDRD portfolio-management process, program statistics for the year, and highlights of accomplishments for the year. A summary of each project, submitted by the principal investigator. Project summaries include the scope, motivation, goals, relevance to Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and Lawrence Livermore National Laboratory (LLNL) mission areas, the technical progress achieved in FY08, and a list of publications that resulted from the research in FY08. Summaries are organized in sections by research category (in alphabetical order). Within each research category, the projects are listed in order of their LDRD project category: Strategic Initiative (SI), Exploratory Research (ER), Laboratory-Wide Competition (LW), and Feasibility Study (FS). Within each project category, the individual project summaries appear in order of their project tracking code, a unique identifier that consists of three elements. The first is the fiscal year the project began, the second represents the project category, and the third identifies the serial number of the proposal for that fiscal year

  19. The FY2011 Federal Budget

    Science.gov (United States)

    2010-08-04

    long been the largest source of federal revenues, followed by social insurance (payroll) taxes. Federal individual and corporate income tax revenues...915 billion (6.4% of GDP). Corporate income tax revenues fell from $304 billion in FY2008 to $138 billion in FY2009. Federal revenues from other

  20. Health Insurance Premium Increases for the 5 Largest School Districts in the United States, 20042008

    Science.gov (United States)

    Cantillo, John R.

    2010-01-01

    Background Local school districts are often one of the largest, if not the largest, employers in their respective communities. Like many large employers, school districts offer health insurance to their employees. There is a lack of information about the rate of health insurance premiums in US school districts relative to other employers. Objective To assess the change in the costs of healthcare insurance in the 5 largest public school districts in the United States, between 2004 and 2008, as representative of large public employers in the country. Methods Data for this study were drawn exclusively from a survey sent to the 5 largest public school districts in the United States. The survey requested responses on 3 data elements for each benefit plan offered from 2004 through 2008; these included enrollment, employee costs, and employer costs. Results The premium growth for the 5 largest school districts has slowed down and is consistent with other purchasers—Kaiser/Health Research & Educational Trust and the Federal Employee Health Benefit Program. The average increase in health insurance premium for the schools was 5.9% in 2008, and the average annual growth rate over the study period was 7.5%. For family coverage, these schools provide the most generous employer contribution (80.8%) compared with the employer contribution reported by other employers (73.5%) for 2008. Conclusions Often the largest employers in their communities, school districts demonstrate a commitment to provide choice of benefits and affordability for employees and their families. Despite constraints typical of public employers, the 5 largest school districts in the United States have decelerated in premium growth consistent with other purchasers, albeit at a slower pace. PMID:25126311

  1. LDRD FY2004 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Kotta, P. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kline, K. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2005-02-28

    The Laboratory Directed Research and Development (LDRD) Program is our primary means for pursuing innovative, long-term, high-risk, and potentially high-payoff research that supports the missions of the Laboratory, the Department of Energy, and the National Nuclear Security Administration in national security, homeland security, energy security, environmental management, bioscience and healthcare technology, and breakthroughs in fundamental science and technology. The LDRD Program was authorized by Congress in 1991 and is administered by the Laboratory Science and Technology Office. The accomplishments described in this Annual Report demonstrate how the LDRD portfolio is strongly aligned with these missions and contributes to the Laboratory’s success in meeting its goals. The LDRD budget of $69.8 million for FY2004 sponsored 220 projects. These projects were selected through an extensive peer-review process to ensure the highest scientific and technical quality and mission relevance. Each year, the number of meritorious proposals far exceeds the funding available, making the selection a challenging one indeed. Our ongoing investments in LDRD have reaped long-term rewards for the Laboratory and the Nation. Many Laboratory programs trace their roots to research thrusts that began several years ago under LDRD sponsorship. In addition, many LDRD projects contribute to more than one mission area, leveraging the Laboratory’s multidisciplinary team approach to science and technology. Safeguarding the Nation from terrorist activity and the proliferation of weapons of mass destruction will be an enduring mission of this Laboratory, for which LDRD will continue to play a vital role. The LDRD Program is a success story. Our projects continue to win national recognition for excellence through prestigious awards, papers published in peer-reviewed journals, and patents granted. With its reputation for sponsoring innovative projects, the LDRD Program is also a major vehicle

  2. 2001-2008 BBG Funding Overview

    Data.gov (United States)

    Broadcasting Board of Governors — This dataset presents BBG funding by Agency component for the period between FY 2001 and FY 2008. The data covers funding for each BBG broadcasting entity and for...

  3. LBNL Institutional Plan, FY 1996--2001. Draft

    International Nuclear Information System (INIS)

    1995-06-01

    The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy's strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory's scientific and support divisions

  4. LBNL Institutional Plan, FY 1996--2001. Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  5. 75 FR 39493 - United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015

    Science.gov (United States)

    2010-07-09

    ... plan includes the USPTO's mission statement, vision statement and a description of the strategic goals... achieve its vision. Full details on how the USPTO plans to implement the strategic plan, including funding...] United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015 AGENCY: United States...

  6. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  7. Laboratory Directed Research and Development FY2008 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Kammeraad, J E; Jackson, K J; Sketchley, J A; Kotta, P R

    2009-03-24

    universities, industry, and other scientific and research institutions. By keeping the Laboratory at the forefront of science and technology, the LDRD Program enables us to meet our mission challenges, especially those of our ever-evolving national security mission. The Laboratory Directed Research and Development (LDRD) annual report for fiscal year 2008 (FY08) provides a summary of LDRD-funded projects for the fiscal year and consists of two parts: A broad description of the LDRD Program, the LDRD portfolio-management process, program statistics for the year, and highlights of accomplishments for the year. A summary of each project, submitted by the principal investigator. Project summaries include the scope, motivation, goals, relevance to Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and Lawrence Livermore National Laboratory (LLNL) mission areas, the technical progress achieved in FY08, and a list of publications that resulted from the research in FY08. Summaries are organized in sections by research category (in alphabetical order). Within each research category, the projects are listed in order of their LDRD project category: Strategic Initiative (SI), Exploratory Research (ER), Laboratory-Wide Competition (LW), and Feasibility Study (FS). Within each project category, the individual project summaries appear in order of their project tracking code, a unique identifier that consists of three elements. The first is the fiscal year the project began, the second represents the project category, and the third identifies the serial number of the proposal for that fiscal year.

  8. Twenty-Five Year Site Plan FY2013 - FY2037

    Energy Technology Data Exchange (ETDEWEB)

    Jones, William H. [Los Alamos National Laboratory

    2012-07-12

    Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual

  9. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  10. 2008 Federal Energy Management Program (FEMP) Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Tremper, C.

    2009-07-01

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  11. FY 1991 Task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    1991-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The objectives of work in Fiscal Year (FY) 1991 are to analyze data and models used in Phase 1 and restructure the models to increase accuracy and reduce uncertainty in dose estimation capability. Databases will be expanded and efforts will begin to determine the appropriate scope (space, time, radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Project scope and accuracy requirements, once defined, can be translated into additional model and data requirements later in the project. Task plans for FY 1991 have been prepared based on activities approved by the Technical Steering Panel (TSP) in October 1990 and mid-year revisions discussed at the TSP planning/budget workshop in February 1991. The activities can be divided into two broad categories: (1) model and data development and evaluation, (2) project, technical and communication support. 3 figs., 1 tab

  12. Summaries of research and development activities by using JAERI computer system in FY2003. April 1, 2003 - March 31, 2004

    International Nuclear Information System (INIS)

    2005-03-01

    Center for Promotion of Computational Science and Engineering (CCSE) of Japan Atomic Energy Research Institute (JAERI) installed large computer system included super-computers in order to support research and development activities in JAERI. CCSE operates and manages the computer system and network system. This report presents usage records of the JAERI computer system and big user's research and development activities by using the computer system in FY2003 (April 1, 2003 - March 31, 2004). (author)

  13. Institutional plan FY 1999--FY 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    Los Alamos has a well-defined and nationally important mission: to reduce the global nuclear danger. This central national security mission consists of four main elements: stockpile stewardship, nuclear materials management, nonproliferation and arms control, and cleanup of the environmental legacy of nuclear weapons activities. The Laboratory provides support for and ensures confidence in the nation`s nuclear stockpile without nuclear testing. This challenge requires the Laboratory to continually hone its scientific acumen and technological capabilities to perform this task reliably using an interdisciplinary approach and advanced experimental and modeling techniques. In the last two National Defense Authorization Acts, Congress identified the need to protect the nation from the proliferation of weapons of mass destruction, which includes nuclear, chemical, and biological weapons, and their potential use by terrorists. Los Alamos is applying multidisciplinary science and engineering skills to address these problems. In addition, the Laboratory`s critical programmatic roles in stockpile stewardship and threat reduction are complemented by its waste management operations and environmental restoration work. Information on specific programs is available in Section 2 of this document.

  14. Los Alamos Waste Management FY96 and FY97 Tactical Plan, March 1, 1996

    International Nuclear Information System (INIS)

    1996-01-01

    The Los Alamos National Laboratory (LANL) Waste Management Program (WMP) began a transition to become a open-quotes best of classclose quotes waste management program during fiscal year 1995 (FY95). A best of class waste management program means that LANL will provide cost-effective and compliant management of the minimum amount of waste. In FY94, the WMP could be characterized as a level of effort program requiring several new facilities and new LANL-developed technologies to carry out its waste management responsibilities. By the end of FY95, significant progress had been made in the transition to best of class. The FY96 WMP is realigned and reorganized. Its budget and scope of work are built upon discrete work packages. It is committed to achieving improved cost-effectiveness, providing significant tangible technical results, and to having its performance measured. During FY95, over $11,000,000 in facility and operational costs were avoided. The need for three new major facilities was reexamined and lower cost solutions, not requiring the development of new facilities, were agreed to. Technology development activities were terminated and replaced with the use of commercial facilities to achieve aggressive reductions in the Low-Level Mixed Waste legacy inventory. In addition, over $14,000,000 in improved cost-effectiveness has been included in the FY96 Baseline. An overall WMP vision, specific milestones, performance measures, and commitments are in place for FY96 to ensure that LANL continues the transition to a best of class waste management program. The following table identifies the overall vision and success indicators for FY96

  15. Annual report of the Neutron Irradiation and Testing Reactor Center. FY 2008. April 1, 2008 - March 31, 2009

    International Nuclear Information System (INIS)

    2009-09-01

    The JMTR, one of the most high flux test reactors in the world, has been used for the irradiation experiments of fuels and materials related to LWRs, fundamental research and radioisotope productions. The JMTR was stopped at the beginning of August 2006 to conduct refurbishment works, and the reoperation will be planned from FY 2011. After reoperation, the JMTR will contribute to many fields, such as the lifetime extension of LWRs, expansion of industrial use, progress of science and technology. This report summarizes the activities on refurbishment works, development of new irradiation techniques, enhancement of reactor availability, etc. (author)

  16. Institutional Plan FY 2003 - 2007

    Energy Technology Data Exchange (ETDEWEB)

    Chartock, Michael; Hansen, Todd

    2003-01-27

    The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the

  17. FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    Butcher, T.; Swingle, R.; Crapse, K.; Millings, M.; Sink, D.

    2011-01-01

    and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.

  18. Environmental performance data in environmental report 2008

    International Nuclear Information System (INIS)

    Sato, Yoshinori; Noritake, Kazumitsu; Kawasaki, Takanori; Nemoto, Asako

    2009-02-01

    Japan Atomic Energy Agency published the Environmental Report 2008 concerning the activities of FY 2007 in August, 2008 under 'Law Concerning the Promotion of Business Activities with Environmental Consideration by Specified Corporations, etc, by Facilitating Access to Environmental Information, and Other Measures'. This report has been edited to show detailed environmental performance data in FY 2007 as the base of the Environmental Report 2008. This report would not only ensure traceability of the data in order to enhance the reliability of the environmental report, but also make useful measures for promoting activities of environmental considerations in JAEA. The environmental objectives in FY 2007 were to reduce the amounts of electric power consumption, fossil fuel usage, carbon dioxide emissions, and water usage by more than one percent in comparison with those in the previous fiscal year. The detailed environmental performance data in this report has shown that the numerical targets of the environmental objectives in FY 2007 were achieved. (author)

  19. Epidemiology and trend of common cancers in Iran (2004-2008).

    Science.gov (United States)

    Amori, N; Aghajani, M; Asgarian, F S; Jazayeri, M

    2017-09-01

    Cancer is one of the most important causes of mortality worldwide. It includes approximately 13% of death cases. This study aimed to investigate the incidence trend of common cancers in Iran during 2004-2008 to improve reporting distribution the disease. This was a retrospective study. The study population was all cases of cancer diagnosed in Iran during 2004-2008. The crude incidence rate of cancers was calculated per 100 000 people by age groups and sex. Age-standardised incidence rates (ASRs) were calculated using direct standardisation and the world standard population. Data were analysed using SPSS (version 17) and Microsoft Office Excel 2007. In this study, a total of 301 055 cases of cancer were diagnosed. ASRs were 60.51 and 84.51 in women and men respectively. Most common cancers in men were skin (ASR = 18.85), stomach (15.02), bladder (ASR = 11.25), prostate (ASR = 8.93) and colorectal (ASR = 8.29). Most common cancers in women were breast (ASR = 18.24), skin (ASR = 12.01), colorectal (ASR = 7.75), stomach (ASR = 7.05) and haematocyte (ASR = 4.01). A significant increase was observed in the incidence of cancers in the country. Therefore, it is necessary to perform screening, early diagnosis and treatment in early stages of cancers. © 2016 John Wiley & Sons Ltd.

  20. 2004 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada

    International Nuclear Information System (INIS)

    Vefa Yucel

    2005-01-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (Bechtel Nevada, 2000) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs) for each of the facilities, and reports the results in an annual summary report to the U.S. Department of Energy Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (U.S. Department of Energy [DOE]). The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office performed annual reviews in fiscal year (FY) 2004 by evaluating operational factors and research results that impact the continuing validity of the PA and CA results. This annual summary report presents data and conclusions from the FY 2004 review, and determines the adequacy of the PAs and CAs. Operational factors, such as the waste form and containers, facility design, waste receipts, closure plans, as well as monitoring results and research and development (R and D) activities were reviewed in FY 2004 for the determination of the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R and D activities were reviewed for the determination of the adequacy of the CAs

  1. Compendium of Data for the Hanford Site (Fiscal Years 2004 to 2008) Applicable to Estimation of Recharge Rates

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, William E.; Rockhold, Mark L.; Downs, Janelle L.

    2008-09-24

    This report is a compendium of recharge data collected in Fiscal Years 2004 through 2008 at various soil and surface covers found and planned in the 200 West and 200 East Areas of the U.S. Department of Energy’s Hanford Site in southeast Washington State. The addition of these new data to previously published recharge data will support improved estimates of recharge with respect to location and soil cover helpful to evaluations and risk assessments of radioactive and chemical wastes at this site. Also presented are evaluations of the associated uncertainties, limitations, and data gaps in the existing knowledge base for recharge at the Hanford Site.

  2. Summaries of research and development activities by using JAEA computer system in FY2007. April 1, 2007 - March 31, 2008

    International Nuclear Information System (INIS)

    2008-11-01

    Center for Computational Science and e-Systems (CCSE) of Japan Atomic Energy Agency (JAEA) installed large computer systems including super-computers in order to support research and development activities in JAEA. This report presents usage records of the JAEA computer system and the big users' research and development activities by using the computer system in FY2007 (April 1, 2007 - March 31, 2008). (author)

  3. Energy materials coordinating committee (EMaCC). Annual technical report, fiscal year 2004

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2005-08-31

    The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/workshops on selected topics involving both DOE and major contractors. In addition, EMaCC assists in obtaining materials-related inputs for both intra- and interagency compilations. Topical subcommittees of the EMaCC are responsible for conducting seminars and otherwise facilitating information flow between DOE organizational units in materials areas of particular importance to the Department. The EMaCC Terms of Reference were recently modified and developed into a Charter that was approved on June 5, 2003. As a result of this reorganization, the existing subcommittees were disbanded and new subcommittees are being formed. The FY 2004 budget summary for DOE Materials Activities is presented on page 8. The distribution of these funds between DOE laboratories, private industry, academia and other organizations is presented in tabular form on page 10. Following the budget summary is a set of detailed program descriptions for the FY 2004 DOE Materials activities. These descriptions are presented according to the organizational structure of the Department. A mission statement, a budget summary listing the project titles and FY 2004 funding, and detailed project summaries are presented for each Assistant Secretary office, the Office of Science, and the National Nuclear Security Administration. The project summaries also provide DOE, laboratory, academic and industrial contacts for each project, as appropriate.

  4. Buried waste integrated demonstration FY 94 deployment plan

    International Nuclear Information System (INIS)

    Hyde, R.A.; Walker, S.; Garcia, M.M.

    1994-05-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The fiscal year (FY) 1994 effort will fund thirty-eight technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. This document is the basic operational planning document for deployment of all BWID projects. Discussed in this document are the BWID preparations for INEL field demonstrations, INEL laboratory demonstrations, non-INEL demonstrations, and paper studies. Each technology performing tests will prepare a test plan to detail the specific procedures, objectives, and tasks of each test. Therefore, information specific to testing each technology is intentionally omitted from this document

  5. Office of Crystalline Repository Development FY 83 technical project plan

    International Nuclear Information System (INIS)

    1983-03-01

    The technical plan for FY 83 activities of the Office of Crystalline Repository Development is presented in detail. Crystalline Rock Project objectives are discussed in relation to the National Waste Terminal storage (NWTS) program. The plan is in full compliance with requirements mandated by the Nuclear Waste Policy Act of 1982. Implementation will comply with the requirements and criteria set forth in the Nuclear Regulatory Commission regulations (10 CFR 60) and the Environmental Protection Agency standard (40 CFR 191). Technical approaches and the related milestones and schedules are presented for each of the Level 3 NWTS work Breakdown Structure Tasks. These are: Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities and Excavations, Land Acquisition, and Program Management

  6. Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.

  7. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.

  8. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    Energy Technology Data Exchange (ETDEWEB)

    Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.; Olson, Karl R.; Grether, Donald F.; Clary, Mary M.; Smith, Brian M.; Stevens, David F.; Ross, Loren; Alper, Mark D.; Dairiki, Janis M.; Fong, Pauline L.; Bartholomew, James C.

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.

  9. Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

  10. Environmental Restoration and Waste Management Site-Specific Plan (SSP) for fiscal year 1992 (FY92)

    International Nuclear Information System (INIS)

    1991-09-01

    The FY-92 Site-Specific Plan (FY-92 SSP) for environmental restoration and waste management at the Idaho National Engineering Laboratory (INEL) is designed to provide the reader with easy access to the status of environmental restoration and waste management activities at INEL. The first chapter provides background on INIEL's physical environment, site history and mission, and general information about the site and its facilities. In addition, this chapter discusses the inter-relationships between the Site Specific Plan, the Environmental Restoration and Waste Management Five-Year Plan, the environmental restoration and waste management prioritization systems, and the Activity Data Sheets (ADSs) for environmental restoration and waste management. This discussion should help readers understand what the SSP is and how it fits into the environmental restoration and waste management process at INEL. This understanding should provide the reader with a better context for understanding the discussions in the SSP as well as a better feel for how and what to comment on during the public comment period that will be held from the first of September through the end of October 1991

  11. Ecological Characterization Data for the 2004 Composite Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Downs, Janelle L.; Simmons, Mary A.; Stegen, Jennifer A.; Bunn, Amoret L.; Tiller, Brett L.; Thorsten, Susan L.; Zufelt, Rhett K.

    2004-11-01

    A composite analysis is required by U.S. Department of Energy (DOE) Order 435.1 to ensure public safety through the management of active and planned low-level radioactive waste disposal facilities associated with the Hanford Site. The original Hanford Site Composite Analysis of 1998 must be revised and submitted to DOE Headquarters (DOE-HQ) in 2004 because of revisions to waste site information in the 100, 200, and 300 Areas, updated performance assessments and environmental impact statements (EIS), changes in inventory estimates for key sites and constituents, and a change in the definition of offsite receptors. Beginning in fiscal year (FY) 2003, the DOE Richland Operations Office (DOE-RL) initiated activities, including the development of data packages, to support the 2004 Composite Analysis. This report describes the data compiled in FY 2003 to support ecological site assessment modeling for the 2004 Composite Analysis. This work was conducted as part of the Characterization of Systems Task of the Groundwater Remediation Project (formerly the Groundwater Protection Program) managed by Fluor Hanford, Inc., Richland, Washington. The purpose of this report is to provide summaries of the characterization information and available spatial data on the biological resources and ecological receptors found in the upland, riparian, aquatic, and island habitats on the Hanford Site. These data constitute the reference information used to establish parameters for the ecological risk assessment module of the System Assessment Capability and other assessment activities requiring information on the presence and distribution of biota on the Hanford Site.

  12. Ecological Characterization Data for the 2004 Composite Analysis

    International Nuclear Information System (INIS)

    Downs, Janelle L.; Simmons, Mary A.; Stegen, Amanda A.; Bunn, Amoret L.; Tiller, Brett L.; Thorsten, Susan L.; Zufelt, Rhett K.

    2004-01-01

    A composite analysis is required by U.S. Department of Energy (DOE) Order 435.1 to ensure public safety through the management of active and planned low-level radioactive waste disposal facilities associated with the Hanford Site. The original Hanford Site Composite Analysis of 1998 must be revised and submitted to DOE Headquarters (DOE-HQ) in 2004 because of revisions to waste site information in the 100, 200, and 300 Areas, updated performance assessments and environmental impact statements (EIS), changes in inventory estimates for key sites and constituents, and a change in the definition of offsite receptors. Beginning in fiscal year (FY) 2003, the DOE Richland Operations Office (DOE-RL) initiated activities, including the development of data packages, to support the 2004 Composite Analysis. This report describes the data compiled in FY 2003 to support ecological site assessment modeling for the 2004 Composite Analysis. This work was conducted as part of the Characterization of Systems Task of the Groundwater Remediation Project (formerly the Groundwater Protection Program) managed by Fluor Hanford, Inc., Richland, Washington. The purpose of this report is to provide/SUMmaries of the characterization information and available spatial data on the biological resources and ecological receptors found in the upland, riparian, aquatic, and island habitats on the Hanford Site. These data constitute the reference information used to establish parameters for the ecological risk assessment module of the System Assessment Capability and other assessment activities requiring information on the presence and distribution of biota on the Hanford Site

  13. Report: FISMA - Fiscal Year 2004 Status of EPA’s Computer Security Program

    Science.gov (United States)

    Report #2004-S-00007, September 30, 2004. This report synopsizes the results of information technology security work the U.S. Environmental Protection Agency’s Office of Inspector General (OIG) performed during Fiscal Year (FY) 2004.

  14. Synergy for a Strong Future FY 2008

    International Nuclear Information System (INIS)

    Devore, L.; Chrzanowski, P.

    2008-01-01

    Lawrence Livermore National Security, LLC is committed to delivering the best combination of scientific research, technology development, business management, and safe, secure operations in support of Lawrence Livermore National Laboratory's critical national security mission. LLNS was formed specifically to manage LLNL for the Department of Energy's National Nuclear Security Administration. LLNS consists of a team of five organizations renowned for their expertise and accomplishments throughout the U.S. nuclear weapons complex and beyond - Bechtel National, University of California, Babcock and Wilcox, Washington Division of URS Corporation, and Battelle. Bechtel is the nation's largest engineering and construction firm and a leader in project management. The University of California is the world's largest public research institution. Babcock and Wilcox and the Washington Division of URS Corporation are top nuclear facilities contractors and between them manage four of DOE's five safest sites. Battelle is a global leader in science and technology development and commercialization. The LLNS Board of Governors provides oversight for the management of the Laboratory and holds the Director and LLNS President responsible for the Laboratory's performance. The Board has seven standing committees that assist in assessing Laboratory performance and monitoring risks and internal controls. Through the Board of Governors, the Laboratory can reach back to LLNS partner organizations to help ensure that it fulfills its national security mission with excellence in scientific research, technology development, business management, and safe, secure operations. LLNS assumed management of LLNL on October 1, 2007. This report highlights LLNS accomplishments in FY2008, its first year as the Laboratory's managing contractor. It is clear that LLNS and the Laboratory have exploited numerous synergies inherent in their relationship - for example, science and engineering, mission and

  15. Annual report of Fusion Research and Development Directorate of JAEA for FY2008 and FY2009

    International Nuclear Information System (INIS)

    Isei, Nobuaki

    2011-03-01

    This annual report provides an overview of major results and progress on research and development (R and D) activities at Fusion Research and Development Directorate of Japan Atomic Energy Agency (JAEA) for FY2008 (from April 1, 2008 to March 31, 2009) and FY2009 (from April 1, 2009 to March 31, 2010), including those performed in collaboration with other research establishments of JAEA, research institutes, and universities. Concerning the ITER project, JAEA was nominated as the domestic agency by the Japanese government after the ITER Agreement took effect, and has fulfilled the obligations. In the development of superconducting conductors, JAEA constructed a technical platform for the fabrication of superconducting conductors for toroidal field (TF) coils ahead of other countries. JAEA immediately started and completed the construction of a plant to fabricate superconducting conductors, and started their fabrication ahead of other countries. In the development of gyrotron high-frequency heating equipment, since only the JAEA satisfies the ITER's procurement specifications among supplier countries, the ITER Organization requested JAEA to conduct confidence tests, and achieved results such as data acquisition that could contribute to the development of the ITER's operational scenario. For the development of neutral beam injectors, advantages of the multi-stage acceleration system developed by JAEA was recognized as a result of comparative experiments with single-stage acceleration systems developed in Europe for the particle acceleration system, and was adopted in the ITER's technical specifications. For the Broader Approach (BA) activities, JAEA was designated as the implementing agency by the Japanese government after the BA Agreement took effect, and has fulfilled the obligations and promoted three projects in the BA activities steadily through domestic cooperation and coordination with Europe. Concerning activities related to the International Fusion Energy

  16. 78 FR 54835 - Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead...

    Science.gov (United States)

    2013-09-06

    ... 4] Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead... Troy 2008 Lead nonattainment area (hereafter referred to as the ``Troy Area'' or ``Area''). The Troy... submittal regarding the attainment plan based on Alabama's attainment demonstration for the Troy Area. The...

  17. Oak Ridge National Laboratory institutional plan, FY 1992--FY 1997

    Energy Technology Data Exchange (ETDEWEB)

    1991-11-01

    In operation for fifty years, the Oak Ridge National Laboratory (ORNL) is managed by Martin Marietta Energy Systems, Inc., for the US Department of Energy (DOE). ORNL is one of DOE's major multiprogram national laboratories. Activities at the Laboratory are focused on basic and applied research, on technology development, and on other technological challenges that are important to DOE and to the nation. The Laboratory also performs research and development (R D) for non-DOE sponsors when such activities complement DOE missions and address important national or international issues. The Laboratory is committed to the pursuit of excellence in all its activities, including the commitment to carry out its missions in compliance with environmental, safety, and health laws and regulations. The principal elements of the Laboratory's missions in support of DOE include activities in each of the following areas: (1) Energy production and conservation technologies; (2) physical and life sciences; (3) scientific and technical user facilities; (4) environmental protection and waste management; (5) science technology transfer; and, (6) education. This institutional plan for ORNL activities is for the next five years: FY 1992--1997.

  18. Human Resources Staffing Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    BOSLEY, J.W.

    2000-01-01

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline

  19. Nevada Nuclear Waste Storage Investigations. FY 1979 project plan

    International Nuclear Information System (INIS)

    1979-03-01

    This document presents the management and cost for the Nevada Nuclear Waste Storage Investigations (disposal of high-level wastes at Nevada Test Site) and provides a complete description of the overall project, management structure, technical approach, and work breakdown structure. The document is organized into five major sections. Section I summarizes the history of the project and indicates a potential future course of action. FY 1979 project work is briefly described in Section II. Section III outlines the delegated responsibilities of all project management functions. A list of critical questions that guide the technical approach of the project are presented in Section IV. Section V contains subtask work plans which outline the work in detail for this fiscal year

  20. Stabilization of overweight prevalence and improvement of dietary habits in French children between 2004 and 2008.

    Science.gov (United States)

    Carriere, Caroline; Langevin, Coralie; Déti, Eduoard Kossi; Barberger-Gateau, Pascale; Maurice, Sylvie; Thibault, Hélène

    2015-07-01

    The objective of the present study was to describe changes in overweight and obesity prevalence and eating habits among 7.5-10.5-year-old children in Aquitaine (France) between 2004 and 2008, and to assess how the programme 'Nutrition, Prevention and Health of children and teenagers in Aquitaine' implemented in 2004 may have impacted these changes. Two cross-sectional studies were conducted in two samples of children: the 'before programme' sample during the school year 2004/2005 and the 'after programme' sample during the school year 2008/2009. Settings Data were collected on gender, age, weight, height, area of residence (rural/urban) and socio-economic status of the school (non-low socio-economic/low socio-economic). Multivariate analyses were used to assess the effect of the regional programme intervention on the evolution of overweight and obesity prevalence and eating habits independently. The 'before programme' sample included 1836 children from 163 schools during the school year 2004/2005 and the 'after programme' sample included 3483 children from 210 schools during the school year 2008/2009. After adjustment of the model for age, residential area and socio-economic status of the area of residence, the prevalence of overweight including obesity (OR = 1.05; 95% CI 0.89, 1.23, P = 0.56) and of obesity (OR = 0.99; 95% CI 0.71, 1.39, P = 0.96) was found to have stabilized and eating habits had improved: intake of light afternoon meals had increased (OR = 1.38; 95% CI 1.13, 1.69, P = 0.002) while snacking in the morning (OR = 0.50; 95 % CI 0.45, 0.57, P eating habits in order to stabilize or decrease the prevalence of overweight.

  1. SOLID WASTE INTEGRATED FORECAST TECHNICAL (SWIFT) REPORT FY2005 THRU FY2035 2005.0 VOLUME 2

    Energy Technology Data Exchange (ETDEWEB)

    BARCOT, R.A.

    2005-08-17

    This report provides up-to-date life cycle information about the radioactive solid waste expected to be managed by Hanford's Waste Management (WM) Project from onsite and offsite generators. It includes: (1) an overview of Hanford-wide solid waste to be managed by the WM Project; (2) multi-level and waste class-specific estimates; (3) background information on waste sources; and (4) comparisons to previous forecasts and other national data sources. The focus of this report is low-level waste (LLW), mixed low-level waste (MLLW), and transuranic waste, both non-mixed and mixed (TRU(M)). Some details on hazardous waste are also provided, however, this information is not considered comprehensive. This report includes data requested in December, 2004 with updates through March 31,2005. The data represent a life cycle forecast covering all reported activities from FY2005 through the end of each program's life cycle and are an update of the previous FY2004.1 data version.

  2. Rocky Mountain Research Station 2008-2012 National Fire Plan Investments

    Science.gov (United States)

    Erika Gallegos

    2013-01-01

    This report highlights selected accomplishments by the USDA Forest Service Rocky Mountain Research Station's Wildland Fire and Fuels Research & Development projects in support of the National Fire Plan from 2008 through 2012. These projects are examples of the broad range of knowledge and tools developed by National Fire Plan funding beginning in 2008.

  3. KURRI progress report 2004. April 2004 - March 2005

    International Nuclear Information System (INIS)

    2005-01-01

    The fiscal year 2004 was the 40-th anniversary of Kyoto University research Reactor (KUR) and also the 30-th anniversary of Kyoto University Critical Assembly (KUCA). The KUR and KUCA have been operated for 1,316 and 732 hours, respectively. Kyoto University Research Reactor Institute (KURRI) accepted 5,186 man-day researchers including students in total for their experiments in accordance with the joint use programs among Japanese universities and public research organizations, and for scientific meetings held at KURRI. Note here that, since the application of boron neutron capture therapy (BNCT) was expanded to the head and neck cancers in addition to the brain tumors and skin cancers, the number of patients treated with the BNCT was greatly increasing year by year. Number of clinical irradiations were 11 in FY2002, 36 in FY2003, and 54 in FY2004. The results of these activities are reported in this progress report. The total 153 research issues are categorized to the 10 topics as follows; (1) Slow Neutron Physics and Neutron Scattering includes the 8 issues as general researches. (2) Nuclear Physics and Nuclear Data includes the 15 issues for the project research and the 2 issues as general researches. (3) Reactor Physics and Reactor Engineering includes the 6 issues as general researches. (4) Material Science and Radiation Effects includes the 21 issues for the project research and the 21 issues as general researches. (5) Geochemistry and Environmental Science includes the 16 issues as general researches. (6) Life Science and Medical Science includes the 5 issues for the project research and the 14 issues as general researches. (7) Neutron Capture Therapy includes the 19 issues as general researches. (8) Neutron Radiography and Radiation Application includes the 9 issues for the project research and the 3 issues as general researches. (9) TRU and Nuclear Chemistry includes the 11 issues for the project research. (10) Health Physics and Waste Management includes

  4. Idaho National Engineering and Environmental Laboratory institutional plan -- FY 2000--2004

    Energy Technology Data Exchange (ETDEWEB)

    Enge, R.S.

    1999-12-01

    In this first institutional plan prepared by Bechtel BWXT Idaho, LLC, for the Idaho National Engineering and Environmental Laboratory, the INEEL will focus its efforts on three strategic thrusts: (1) Environmental Management stewardship for DOE-EM, (2) Nuclear reactor technology for DOE-Nuclear Energy (NE), and (3) Energy R and D, demonstration, and deployment (initial focus on biofuels and chemicals from biomass). The first strategic thrust focuses on meeting DOE-EMs environmental cleanup and long-term stewardship needs in a manner that is safe, cost-effective, science-based, and approved by key stakeholders. The science base at the INEEL will be further used to address a grand challenge for the INEEL and the DOE complex--the development of a fundamental scientific understanding of the migration of subsurface contaminants. The second strategic thrust is directed at DOE-NEs needs for safe, economical, waste-minimized, and proliferation-resistant nuclear technologies. As NE lead laboratories, the INEEL and ANL will pursue specific priorities. The third strategic thrust focuses on DOE's needs for clean, efficient, and renewable energy technology. As an initial effort, the INEEL will enhance its capability in biofuels, bioprocessing, and biochemicals. The content of this institutional plan is designed to meet basic DOE requirements for content and structure and reflect the key INEEL strategic thrusts. Updates to this institutional plan will offer additional content and resource refinements.

  5. Portsmouth Gaseous Diffusion Plant Decontamination and Decommissioning Program surveillance and maintenance plan, FY 1993--2002

    International Nuclear Information System (INIS)

    Schloesslin, W.

    1992-11-01

    The Decontamination and Decommissioning (D ampersand D) Program at the Portsmouth Gaseous Diffusion Plant (PORTS) is part of the Environmental Restoration (ER) and Waste Management (WM) Programs (ERWM). The objective of the ER Program is to provide PORTS the capability to meet applicable environmental regulations through facility development activities and site remedial actions. The WM Program supports the ER Program. The D ampersand D Program provides collective management of the sites within the plant which require decontamination and decommissioning, prioritizes those areas in terms of health, safety and environmental concerns, and implements the appropriate level of remedial action. The D ampersand D Program provides support to facilities which formerly served one or more of the many Plant functions. Program activities include (1) surveillance and maintenance of facilities awaiting decommissioning; (2) planning safe and orderly facility decommissioning; and (3) implementing a program to accomplish facility disposition in a safe, cost effective, and timely manner. In order to achieve the first objective, a formal plan which documents the surveillance and maintenance needs for each inactive facility has been prepared. This report provides this documentation for the PORTS facilities currently included in the D ampersand D Program and includes projected resource requirements for the planning period of FY 1993 through FY 2002

  6. Department of Defense Strategic Sustainability Performance Plan FY 2012

    Science.gov (United States)

    2012-01-01

    interoperability of equipment; and the management and oversight of contingency basing. Improved contingency base sustainability will also enhance mission...with communicating classified information from alternate work locations. In FY 2011, NGA developed and began implementing a telecommuting policy...operating procedures. DLA Disposition Services strengthened its oversight of the electronics demanufacturing process in FY 2011 by tightening

  7. DOE Hydrogen Program 2004 Annual Merit Review and Peer Evaluation Report

    Energy Technology Data Exchange (ETDEWEB)

    2004-10-01

    This document summarizes the project evaluations and comments from the DOE Hydrogen Program 2004 Annual Program Review. Hydrogen production, delivery and storage; fuel cells; technology validation; safety, codes and standards; and education R&D projects funded by DOE in FY2004 are reviewed.

  8. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  9. Electronics Engineering Research. Final report, FY 1979

    International Nuclear Information System (INIS)

    Weissenberger, S.

    1980-01-01

    Accomplishments in Electronics Engineering Research (EER) during FY79 spanned a broad range of technologies, from high-speed microelectronics to digital image enhancement; from underground probing with electromagnetic waves to detecting neutrons with a small solid-state device; and from computer systems to aid engineers, to software tools to aid programmers. This report describes the overall EER program and its objectives, summarizes progress made in FY79, and outlines plans for FY80

  10. Advanced Education and Technology Business Plan, 2008-11

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2008

    2008-01-01

    The Ministry of Advanced Education and Technology's 2008-11 business plan identifies how it plans to work over the next three years to enhance advanced learning opportunities and innovation for all Albertans. Alberta's advanced learning system is composed of public board-governed institutions, the apprenticeship and industry training system,…

  11. Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

  12. Trailing (L5) Neptune Trojans: 2004 KV18 and 2008 LC18

    International Nuclear Information System (INIS)

    Guan Pu; Zhou Liyong; Li Jian

    2012-01-01

    The population of Neptune Trojans is believed to be bigger than that of Jupiter Trojans and that of asteroids in the main belt, although only eight members of this distant asteroid swarm have been observed up to now. Six leading Neptune Trojans around the Lagrange point L 4 discovered earlier have been studied in detail, but two trailing ones found recently around the L 5 point, 2004 KV18 and 2008 LC18, have not yet been investigated. We report our investigations on the dynamical behaviors of these two new Neptune Trojans. Our calculations show that the asteroid 2004 KV18 is a temporary Neptune Trojan. Most probably, it was captured into the trailing Trojan cloud no earlier than 2.03 × 10 5 yr ago, and it will not maintain this position later than 1.65 × 10 5 yr in the future. Based on the statistics from our orbital simulations, we argue that this object is more like a scattered Kuiper belt object. By contrast, the orbit of 2008 LC18 is much more stable. Among the clone orbits spreading within the orbital uncertainties, a considerable portion of clones may survive on the L 5 tadpole orbits for 4 Gyr. The strong dependence of the stability on the semimajor axis and resonant angle suggests that further observations are badly required to constrain the orbit in the stable region. We also discuss the implications of the existence and dynamics of these two trailing Trojans over the history of the solar system.

  13. CHARACTERIZATION OF SUICIDE IN ARMENIA, COLOMBIA, 20042008

    Directory of Open Access Journals (Sweden)

    Oscar Medina Pérez

    2010-04-01

    Full Text Available This paper describes trends in mortality from suicide and its main features in the city of Armenia, Colombia, in the period 2004-2008. The suicide figures have been provided by the National Institute of Legal Medicine and Forensic Sciences and population projections are taken from the National Bureau of Statistics (DANE. The results indicate a municipal rate of 8.2 for the five years, falling 64% higher than the rest of the country. A total of 116 suicides were reported during the study period, in the distribution by sex and age groups, the highest rates were found in men aged 70-79 years, with 31.5 cases/100.000 hab.; In female population figure corresponded to the range of 10-19 years, with a rate of 8.6. In general, rates are high compared with other  parts of Colombia. It further identifies the urgency of this public health problem locally, closely related to social factors.

  14. Coronary Heart Disease Mortality in Czech Men, 1980-2004

    Czech Academy of Sciences Publication Activity Database

    Reissigová, Jindra; Tomečková, Marie

    2008-01-01

    Roč. 4, č. 1 (2008), s. 12-16 ISSN 1801-5603 R&D Projects: GA MŠk(CZ) 1M06014 Institutional research plan: CEZ:AV0Z10300504 Keywords : coronary heart disease * cardiovascular * mortality * 1980-2004 Subject RIV: IN - Informatics, Computer Science http://www.ejbi.org/articles/200812/33/1.html

  15. FY16 Strategic Themes White Paper.

    Energy Technology Data Exchange (ETDEWEB)

    Leland, Robert W. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    The Science and Technology (S&T) Division 1000 Strategic Plan includes the Themes, Goals, and Actions for FY16. S&T will continue to support the Labs Strategic plan, Mission Areas and Program Management Units by focusing on four strategic themes that align with the targeted needs of the Labs. The themes presented in this plan are Mission Engagement, Bold Outcomes, Collaborative Environment, and the Safety Imperative. Collectively they emphasize diverse, collaborative teams and a self-reliant culture of safety that will deliver on our promise of exceptional service in the national interest like never before. Mission Engagement focuses on increasing collaboration at all levels but with emphasis at the strategic level with mission efforts across the labs. Bold Outcomes seeks to increase the ability to take thoughtful risks with the goal of achieving transformative breakthroughs more frequently. Collaborative environment strives for a self-aware, collaborative working environment that bridges the many cultures of Sandia. Finally, Safety Imperative aims to minimize the risk of serious injury and to continuously strengthen the safety culture. Each of these themes is accompanied by a brief vision statement, several goals, and planned actions to support those goals throughout FY16 and leading into FY17.

  16. Evolução das principais linhas de crédito ao exportador brasileiro entre 2004 e 2008

    Directory of Open Access Journals (Sweden)

    Julio Cesar de Oliveira

    2010-01-01

    Full Text Available Este trabalho analisa a evolução das duas principais linhas de crédito aos exportadores brasileiros no período entre 2004 e 2008. Inicialmente descrevem-se as linhas de financiamento estudadas, apresentando suas características, restrições e trâmites para obtenção. Os resultados demonstram que, nos últimos cinco anos, as duas principais linhas de crédito não acompanharam o percentual de aumento das exportações brasileiras.Abstract This work analyzes the evolution of the two main credit lines to Brazilian exporters between 2004 and 2008. Initially, it describes the credit lines that were studied, showing its features, restrictions and the necessary procedures for a trader in order to obtain it. The results show that, in the last five years, these credit lines have not accompanied the Brazilian export growth.

  17. Design Study for a Low-Enriched Uranium Core for the High Flux Isotope Reactor, Annual Report for FY 2008

    Energy Technology Data Exchange (ETDEWEB)

    Primm, Trent [ORNL; Chandler, David [ORNL; Ilas, Germina [ORNL; Miller, James Henry [ORNL; Sease, John D [ORNL; Jolly, Brian C [ORNL

    2009-03-01

    This report documents progress made during FY 2008 in studies of converting the High Flux Isotope Reactor (HFIR) from highly enriched uranium (HEU) fuel to low-enriched uranium (LEU) fuel. Conversion from HEU to LEU will require a change in fuel form from uranium oxide to a uranium-molybdenum alloy. With axial and radial grading of the fuel foil and an increase in reactor power to 100 MW, calculations indicate that the HFIR can be operated with LEU fuel with no degradation in reactor performance from the current level. Results of selected benchmark studies imply that calculations of LEU performance are accurate. Scoping experiments with various manufacturing methods for forming the LEU alloy profile are presented.

  18. Fiscal Year 2008 Agency Financial Report

    National Research Council Canada - National Science Library

    2008-01-01

    The Department of Defense (DoD) Fiscal Year (FY) 2008 Agency Financial Report (AFR) provides the President, Congress, other federal departments and agencies, and the American public an overview of the Department's financial condition...

  19. NEAMS Software Licensing, Release, and Distribution: Implications for FY2013 Work Package Planning

    International Nuclear Information System (INIS)

    Bernholdt, David E.

    2012-01-01

    The vision of the NEAMS program is to bring truly predictive modeling and simulation (M and S) capabilities to the nuclear engineering community in order to enable a new approach to the analysis of nuclear systems. NEAMS anticipates issuing in FY 2018 a full release of its computational 'Fermi Toolkit' aimed at advanced reactor and fuel cycles. The NEAMS toolkit involves extensive software development activities, some of which have already been underway for several years, however, the Advanced Modeling and Simulation Office (AMSO), which sponsors the NEAMS program, has not yet issued any official guidance regarding software licensing, release, and distribution policies. This motivated an FY12 task in the Capability Transfer work package to develop and recommend an appropriate set of policies. The current preliminary report is intended to provide awareness of issues with implications for work package planning for FY13. We anticipate a small amount of effort associated with putting into place formal licenses and contributor agreements for NEAMS software which doesn't already have them. We do not anticipate any additional effort or costs associated with software release procedures or schedules beyond those dictated by the quality expectations for the software. The largest potential costs we anticipate would be associated with the setup and maintenance of shared code repositories for development and early access to NEAMS software products. We also anticipate an opportunity, with modest associated costs, to work with the Radiation Safety Information Computational Center (RSICC) to clarify export control assessment policies for software under development.

  20. FY 2009 Supplement to the President`s Budget

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — Published: February 2008 Pages: 37 This Supplement to the President`s Fiscal Year FY 2009 Budget provides a technical summary of the budget request for the...

  1. General Counsel`s office FY 1995 site support program plan WBS 6.10.5

    Energy Technology Data Exchange (ETDEWEB)

    Moreno, S.R.

    1994-09-01

    The General Counsel`s office provides legal counsel to all levels of WHC management; administers the intellectual property program; coordinates all WHC investigative activity and supports WHC activities to ensure compliance with all applicable federal, state, and local laws, DOE directives, contractual provisions, and other requirements. In so doing, the Office of General Counsel supports the Hanford site mission of transforming the Hanford site into an environmentally attractive and economically sustainable community. This document briefs the FY95 site support plan.

  2. Fusion Reactor Safety Research program. Annual report, FY-80

    International Nuclear Information System (INIS)

    Crocker, J.G.; Cohen, S.

    1981-06-01

    The report is in three sections. Outside contracts includes a report of newly-started study at the General Atomic Company to consider safety implications of low-activation materials, portions of two papers from ongoing work at PNL and ANL, reports of the lithium spill work at HEDL, the LITFIRE code development at MIT, and risk assessment at MIT, all of which are an expansion of FY-79 outside contracts. EG and G Activities includes adaptations of four papers of ongoing work in transient code development, tritium system risk assessment, heat transfer and fluid flow analysis, and fusion safety data base. Program Plan Development includes the Executive Summary of the Plan, which was completed in FY-80, and is accompanied by a list of publications and a brief outline of proposed FY-81 activities to be based on the Program Plan

  3. FY 1996 Congressional budget request: Budget highlights

    Energy Technology Data Exchange (ETDEWEB)

    1995-02-01

    The FY 1996 budget presentation is organized by the Department`s major business lines. An accompanying chart displays the request for new budget authority. The report compares the budget request for FY 1996 with the appropriated FY 1995 funding levels displayed on a comparable basis. The FY 1996 budget represents the first year of a five year plan in which the Department will reduce its spending by $15.8 billion in budget authority and by $14.1 billion in outlays. FY 1996 is a transition year as the Department embarks on its multiyear effort to do more with less. The Budget Highlights are presented by business line; however, the fifth business line, Economic Productivity, which is described in the Policy Overview section, cuts across multiple organizational missions, funding levels and activities and is therefore included in the discussion of the other four business lines.

  4. Climate plan 2004; Plan climat 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    The Climate Plan is an action plan drawn up by the French Government to respond to the climate change challenge, first by 2010 (complying with the Kyoto Protocol target), and, secondly, beyond this date. Projections for France show that national emissions could be 10% higher than the Kyoto target in 2010 if no measures are taken. This is particularly due to increasing emissions in the sectors affecting daily life (residential-tertiary sectors, transport, etc.). For this reason, the Climate Plan contains measures affecting all sectors of the economy and the daily life of all French citizens with a view to economizing the equivalent of 54 million tonnes of CO{sub 2} each year by the year 2010, which will help to reverse the trend significantly. Beyond 2010, the Climate Plan sets out a strategy for technological research which will enable France to meet a target of reducing greenhouse gas emissions four or fivefold by 2050. (author)

  5. Conceptual design study of fusion experimental reactor (FY86 FER)

    International Nuclear Information System (INIS)

    Saito, Ryusei; Kashihara, Shin-ichiro; Itoh, Shin-ichi

    1987-08-01

    This report describes the results of conceptual design study on plant systems for the Fusion Experimental Reactor (FY86 FER). Design studies for FER plant systems have been continued from FY85, especially for design modifications made in accordance with revisions of plasma scaling parameters and system improvements. This report describes 1) system construction, 2) site and reactor building plan, 3) repaire and maintenance system, 4) tritium circulation system, 5) heating, ventilation and air conditioning system, 6) tritium clean-up system, 7) cooling and baking system, 8) waste treatment and storage system, 9) control system, 10) electric power system, 11) site factory plan, all of which are a part of FY86 design work. The plant systems described in this report generally have been based on the FY86 FER (ACS Reactor) which is an one of the six candidates for FER. (author)

  6. Oak Ridge National Laboratory DOE Site Sustainability Plan (SSP) with FY 2013 Performance Data

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, Teresa A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Lapsa, Melissa Voss [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2013-12-01

    Oak Ridge National Laboratory (ORNL) is both the largest science and energy laboratory of the US Department of Energy (DOE) and one of the oldest national laboratories still operating at its original site. These characteristics provide the Sustainable Campus Initiative (SCI) both a unique opportunity and a unique challenge to integrate sustainability into facilities and activities. As outlined in this report, SCI is leveraging the outcomes of ORNL’s DOE-sponsored research and development programs to maximize the efficient use of energy and natural resources across ORNL. Wherever possible, ORNL is integrating technical innovations into new and existing facilities, systems, and processes with a widespread approach to achieving Executive Order 13514. ORNL continues to pursue and deploy innovative solutions and initiatives to advance regional, national, and worldwide sustainability and continues to transform its culture and engage employees in supporting sustainability at work, at home, and in the community. Table 1 summarizes ORNL's FY 2013 performance and planned actions to attain future goals. ORNL has achieved numerous successes during FY 2013, which are described in detail throughout this document.

  7. Research and development project plans for FY 1995; 1995 nendo kenkyu kaihatsu jigyo keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The present research and development project plans for FY 1995 administrated by NEDO consist of research and development of new energy, and research and development of industrial technology. Are illustrated further enhancement of new energy introduction promotion measures, new stage of international projects, promotion of new energy and new energy technology development, further enhancement of industrial and scientific technology research and development, integrated measures against global and urban environment problems, and budget of NEDO projects in FY 1995. The research and development of new energy includes coal conversion technology, solar energy technology, geothermal energy technology, energy conversion and storage technology, hydrogen, alcohol and biomass energy technology, geothermal energy resources, coal resources development, new energy promotion department activities, NEDO information center activities, and so on. On the other hand, the research and development of industrial technology includes research and development of industrial technology, and global environment technology. The research and development of industrial technology consists of superconductivity, new materials, biotechnology, electronics, information and communications, machinery and aerospace, natural resources, humanity, life and society, and various leading researches.

  8. USDA Section 9006 Program: Status and Energy Benefits of Grant Awards in FY 2003-2005

    Energy Technology Data Exchange (ETDEWEB)

    Walters, T.; Savage, S.; Brown, J.

    2006-08-01

    At the request of the U. S. Department of Agriculture (USDA) Rural Development, the National Renewable Energy Laboratory reviewed projects awarded in the Section 9006 Program: Renewable Energy Systems and Energy Efficiency Improvements Program. This report quantifies federal and private investment, outlines project status based on recent field updates, and calculates the effects on energy and emissions of energy efficiency and renewable energy projects awarded grants in FY 2003, FY 2004, and FY 2005. An overview of the program challenges and modifications in the first three years of operation is also included.

  9. Building America's Low-e Storm Window Adoption Program Plan (FY2014)

    Energy Technology Data Exchange (ETDEWEB)

    Cort, Katherine A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-12-23

    Low emissivity (low-e) storm windows/panels appear to hold promise for effectively reducing existing home heating, ventilation, and air-conditioning (HVAC) consumption. Due to the affordability of low-e storm windows and the large numbers of existing homes that have low-performing single-pane or double-pane clear windows, a tremendous opportunity exists to provide energy savings by transforming the low-e storm window market and increasing market adoption. This report outlines U.S. Department of Energy (DOE) Building America’s planned market transformation activities in support of low-e storm window adoption during fiscal year (FY) 2014.

  10. Ohio Department of Transportation : 2008-2009 Business Plan

    Science.gov (United States)

    2007-11-01

    On behalf of the new Administration of Governor Ted Strickland and the more than 6,000 hard working men and women of the Ohio Department of Transportation, I am pleased to submit the Ohio Department of Transportation 2008-2009 Business Plan. : This b...

  11. Research production among students from the Facultad Nacional de Salud Publica, Universidad de Antioquia, during the period 2004-2008

    Directory of Open Access Journals (Sweden)

    Camilo Noreña H

    2011-05-01

    Full Text Available Objective: to describe the research production of undergraduate students from the National Faculty of Public Health (Facultad Nacional de Salud Pública, FNSP, Universidad deAntioquia, during the period 2004-2008. Methods: descriptive study document review. The Study population was limited to graduation projects according to their different modalities (research projects, development project and monographs of the three undergraduate programs at the FNSP and research papers published in the Revista Facultad Nacional de SaludPública during the period 2004-2008. The analysis unit was restricted to graduation projects that could be located at the FNSP library and research papers including undergraduatestudents as authors. Descriptive statistics were used for the analysis of the data collected. Results: a total amount of 279 graduation projects were reviewed, from wich 119 (42.7% were research projects. In the undergraduate program of Management of Health Information Systems, research projects were the most frequent type of graduation project (79.1%. This proportion was smaller in the health administration programs both in its emphasis in health services (36.2% and in its emphasis on environment and sanitation (19.7%. A total amount of 126 research papers were reviewd finding 22 (17.5% with undergraduate students of the FNSP as coauthors. The proportion of research projects published in the Revista FNSP was 11.8%. Conclusions: during the period2004-2008, two out of five graduation projects in the FNSPwere research projects. During the period studied important differences according to the undergraduate programs were observed. The proportion of research projects published in the Revista FNSP is still very small.

  12. Financial Management: DoD Civilian Payroll Withholding Data For FY 2004

    National Research Council Canada - National Science Library

    Granetto, Paul J; Neville, Douglas P; Winter, Thomas J; Powell, Joseph; Rabben, Jonathan; Bilock, Joseph; Trahan, Demetria; Carlquist, Daniel

    2005-01-01

    ..., and Retirement for the payroll periods ended October 4, 2003; December 27, 2003; February 21, 2004; and March 6, 2004; and Semiannual Headcount Reports as of February 21, 2004, and March 6, 2004...

  13. Identification of land cover changes in the coastal area of Dakshina Kannada district, South India during the year 20042008

    Directory of Open Access Journals (Sweden)

    J. Jayanth

    2016-06-01

    Full Text Available This study investigates land cover (LC changes in the coastal area of Dakshina Kannada district in the state of Karnataka, South India, during the years 20042008 as a case study. IRS P-6, Linear Imaging Self Scanning sensor (LISS-IV satellite images were used in the present work. Classification was carried out using artificial bee colony algorithm and support vector machine (SVM which gave a better result compared to other traditional classification techniques. The best overall classification accuracy for the study area was achieved with an ABC classifier with an OCA of 80.35% for 2004 year data and OCA of 80.40% for 2008 year data, whereas the OCA in SVM, for the same training set is 71.42% for 2004 data and 71.38% for 2008 data on study area 1 and the results were optimised with respect to multispectral data. In study area 2, ABC algorithm achieved an OCA of 78.17% and MLC of 62.63% which was used to check the universality of the classifier. The classification results with post-classification technique for study area 1 indicate that urbanisation in the study area has almost increased twice. During the same time there is an increase in the forest plantation, agricultural plantation and a decrease in crop land and land without scrubs, indicates rapid changes in the coastal environment.

  14. Updated FY12 Ceramic Fuels Irradiation Test Plan

    International Nuclear Information System (INIS)

    Nelson, Andrew T.

    2012-01-01

    The Fuel Cycle Research and Development program is currently devoting resources to study of numerous fuel types with the aim of furthering understanding applicable to a range of reactors and fuel cycles. In FY11, effort within the ceramic fuels campaign focused on planning and preparation for a series of rabbit irradiations to be conducted at the High Flux Isotope Reactor located at Oak Ridge National Laboratory. The emphasis of these planned tests was to study the evolution of thermal conductivity in uranium dioxide and derivative compositions as a function of damage induced by neutron damage. Current fiscal realities have resulted in a scenario where completion of the planned rabbit irradiations is unlikely. Possibilities for execution of irradiation testing within the ceramic fuels campaign in the next several years will thus likely be restricted to avenues where strong synergies exist both within and outside the Fuel Cycle Research and Development program. Opportunities to augment the interests and needs of modeling, advanced characterization, and other campaigns present the most likely avenues for further work. These possibilities will be pursued with the hope of securing future funding. Utilization of synthetic microstructures prepared to better understand the most relevant actors encountered during irradiation of ceramic fuels thus represents the ceramic fuel campaign's most efficient means to enhance understanding of fuel response to burnup. This approach offers many of the favorable attributes embraced by the Separate Effects Testing paradigm, namely production of samples suitable to study specific, isolated phenomena. The recent success of xenon-imbedded thick films is representative of this approach. In the coming years, this strategy will be expanded to address a wider range of problems in conjunction with use of national user facilities novel characterization techniques to best utilize programmatic resources to support a science-based research program.

  15. Southeastern Power Administration 2008 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-12-29

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2008 Annual Report for your review. The information included in this document reflects our agency’s programs, accomplishments, operational and financial activities for the 12-month period beginning October 1, 2007 and ending September 30, 2008. Southeastern marketed more than 4.5 billion kilowatt-hours of energy to 491 wholesale customers in ten southeastern states this past year. Revenues from the sale of this power totaled approximately $263 million. Drought conditions persisted in the southeastern region of the United States during FY 2008 placing strains on our natural and financial resources. Power purchases for FY 2008 totaled $91 million. Approximately $44 million of this amount was for replacement power which is paid only during adverse water conditions in order to meet our customers’ contract requirements. With the continued financial assistance and support of our Federal power customers, funding for capitalized equipment purchases and replacements at U.S. Army Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for these aging facilities. Southeastern’s cyber and physical security programs continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation (NERC) standards and requirements. In the coming year, Southeastern will continue open communication and cooperation with DOE, the Federal power customers, and the Corps to maximize the benefits of our region’s water resources. Although competing uses of water and the prolonged drought conditions will present another challenging year for our agency, Southeastern’s employees will meet these challenges and continue to provide reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E.Legg Administrator

  16. National Fire Plan Research and Development 2004-2005 accomplishment report

    Science.gov (United States)

    Michael W. Hilbruner; Paul Keller

    2007-01-01

    This report highlights accomplishments achieved by USDA Forest Service National Fire Plan Research and Development projects from 2004 through 2005 in four key areas: firefighting, rehabilitation and restoration, hazardous fuels reduction, and community assistance. These highlights illustrate the broad range of knowledge and tools introduced and generated by the...

  17. Environmental Measurements Laboratory 2002 Unit Performance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-10-01

    This EML Unit Performance Plan provides the key goals and performance measures for FY 2002 and continuing to FY 2003. The purpose of the Plan is to inform EML's stakeholders and customers of the Laboratory's products and services, and its accomplishments and future challenges. Also incorporated in the Unit Performance Plan is EML's Communication Plan for FY 2002.

  18. Waste statistics 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-04-07

    The 2004 reporting to the ISAG comprises 394 plants owned by 256 enterprises. In 2003, reports covered 403 plants owned by 273 enterprises. Waste generation in 2004 is compared to targets for 2008 in the government's Waste Strategy 2005-2008. The following summarises waste generation in 2004: 1) In 2004, total reported waste arisings amounted to 13,359,000 tonnes, which is 745,000 tonnes, or 6 per cent, more than in 2003. 2) If amounts of residues from coal-fired power plants are excluded from statistics, waste arisings in 2004 were 12,179,000 tonnes, which is a 9 per cent increase from 2003. 3) If amounts of residues from coal-fired power plants and waste from the building and construction sector are excluded from statistics, total waste generation in 2004 amounted to 7,684,000 tonnes, which is 328,000 tonnes, or 4 per cent, more than in 2002. In other words, there has been an increase in total waste arisings, if residues and waste from building and construction are excluded. Waste from the building and construction sector is more sensitive to economic change than most other waste. 4) The total rate of recycling was 65 per cent. The 2008 target for recycling is 65 per cent. The rate of recycling in 2003 was also 65 per cent. 5) The total amount of waste led to incineration amounted to 26 per cent, plus an additional 1 per cent left in temporary storage to be incinerated at a later time. The 2008 target for incineration is 26 per cent. These are the same percentage figures as applied to incineration and storage in 2003. 6) The total amount of waste led to landfills amounted to 8 per cent, which is one percentage point better than the overall landfill target of a maximum of 9 per cent landfilling in 2008. Also in 2003, 8 per cent of the waste was landfilled. 7) The targets for treatment of waste from individual sectors are still not being met: too little waste from households and the service sector is being recycled, and too much waste from industry is being

  19. FY 1992 revised task plans for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1992-04-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objectives of work to be performed in FY 1992 is to determine the appropriate scope (space, time, and radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Another objective is to use a refined computer model to estimate Native American tribal doses and individual doses for the Hanford Thyroid Disease Study (HTDS). Project scope and accuracy requirements defined in FY 1992 can translated into model and data requirements that must be satisfied during FY 1993

  20. FY 1987 program summary document: Office of Defense Waste and Transportation Management

    International Nuclear Information System (INIS)

    1987-04-01

    This document describes the Office of Defense Waste and Transportation Management (DWTM) Program as supported by the President's Fiscal Year (FY) 1987 Budget Request to Congress. It specifically addresses the program's organization, objectives, strategies, and plans for FY 1987

  1. State, Foreign Operations, and Related Programs: FY2009 Appropriations

    Science.gov (United States)

    2009-04-03

    resources in a few low- and low- middle income countries that have demonstrated a strong commitment to political, economic, and social reforms. The...several other areas.11 In FY2008, BBG proposed to reduce or eliminate radio broadcasting in a number of services, including Cantonese , Ukrainian

  2. Emergency medical consequence planning and management for national special security events after September 11: Boston 2004.

    Science.gov (United States)

    Kade, Kristy A; Brinsfield, Kathryn H; Serino, Richard A; Savoia, Elena; Koh, Howard K

    2008-10-01

    The post-September 11 era has prompted unprecedented attention to medical preparations for national special security events (NSSE), requiring extraordinary planning and coordination among federal, state, and local agencies. For an NSSE, the US Secret Service (USSS) serves as the lead agency for all security operations and coordinates with relevant partners to provide for the safety and welfare of participants. For the 2004 Democratic National Convention (DNC), designated an NSSE, the USSS tasked the Boston Emergency Medical Services (BEMS) of the Boston Public Health Commission with the design and implementation of health services related to the Convention. In this article, we describe the planning and development of BEMS' robust 2004 DNC Medical Consequence Management Plan, addressing the following activities: public health surveillance, on-site medical care, surge capacity in the event of a mass casualty incident, and management of federal response assets. Lessons learned from enhanced medical planning for the 2004 DNC may serve as an effective model for future mass gathering events.

  3. Agrarian foreign trade of the Czech Republic in the period of 20042008, competitiveness of commodities

    Directory of Open Access Journals (Sweden)

    Jaroslava Burianová

    2011-01-01

    Full Text Available The paper deals with agrarian foreign trade (AFT of the Czech Republic during the period of 20042008. Distinct changes in the trade volume, but also changes in the net export structure were observed. The export is being assisted with a much larger trading area without customs restrictions but it is also exposed to a much tougher competition. A methodology that makes it possible to evaluate the competitiveness of individual commodities is described in the first part. A sequence of individual items from a total list of basic food goods was analyzed using chosen indicators – Balass indicator RCA (Revealed Comparative Advantage as well as the Michaely index MI that shows a specific degree of specialization for export. In the Results section, attention is firstly focused on the year 2004. The values of export and import for 24 items of basic food commodities are summarised, and the most important items in respect of the share in total export are selected. Analogical output was acquired for the year 2008. The values of RCA and MI indicators are then itemised, and a sequence is determined for the highest values for the commodities able to compete that shows the specific degree of specialization for export.

  4. Quarterly report on program cost and schedule: Fourth quarter FY 1988

    International Nuclear Information System (INIS)

    1988-01-01

    Major program milestones completed in the fourth quarter of FY 1988 include completed preliminary draft NWPAA Section 175 Impacts Report, completed Title I ESF design, completed site reclamation in Texas, distributed review draft of the Dry Cask Storage Study, completed draft and final FY 1990 OMB budget, issued FY 1987 Annual Report to Congress, issued four draft Environmental Field Activity Plans, issued draft Environmental Program Overview, and made grant payments to local governments under Section 116 of NWPA, as amended. Major accomplishments during the fourth quarter of FY 1988 are listed. The Water Appropriation Permit Application was filed with the Nevada State Engineer on July 21, 1988. Installation and checkout of the Prototype Engineered Barrier Test equipment in G-tunnel is continuing with an expected early September test initiation data. The Configuration Management Plan was sent to DOE/HQ for approval. The prototype facility for testing the horizontal waste package emplacement configuration was completed in the G-tunnel

  5. Quality of groundwater at and near an aquifer storage and recovery site, Bexar, Atascosa, and Wilson Counties, Texas, June 2004-August 2008

    Science.gov (United States)

    Otero, Cassi L.; Petri, Brian L.

    2010-01-01

    recovery wells likely indicate some degree of mixing of the two waters occurred rather than continued decay of radium-226 in the injected water. Geochemical and isotope data measured in samples collected in May 2005 from two Carrizo aquifer monitoring wells and in July 2008 from the three ASR production-only wells in the northern section of the ASR site indicate that injected Edwards aquifer water had not migrated to these five sites. Geochemical and isotope data measured in samples collected from Carrizo aquifer wells in 2004, 2005, and 2008 were graphically analyzed to determine if changes in chemistry could be detected. Major-ion, trace element, and isotope chemistry varied spatially in the samples collected from the Carrizo aquifer. With the exception of a few samples, major-ion concentrations measured in samples collected in Carrizo aquifer wells in 2004, 2005, and 2008 were similar. A slightly larger sulfate con-centration and a slightly smaller bicarbonate concentration were measured in samples collected in 2005 and 2008 from well NC1 compared to samples collected at well NC1 in 2004. Larger sodium concentrations and smaller calcium, magnesium, bicarbonate, and sulfate concentrations were measured in samples collected in 2008 from well WC1 than in samples collected at this well in 2004 and 2005. Larger calcium and magnesium concentrations and a smaller sodium concentration were measured in the samples collected in 2008 at well EC2 compared to samples collected at this well in 2004 and 2005. While in some cases the computed percent differences (compared to concentrations from June 2004) in dissolved iron and dissolved manganese concentrations in 11 wells sampled in the Carrizo aquifer in 2005 and 2008 were quite large, no trends that might have been caused by migration of injected Edwards aquifer water were observed. Because of the natural variation in geochemical data in the Carrizo aquifer and the small data set collected for this study, differences in major

  6. Delivering Innovation: The Joint Concept Development and Experimentation Campaign Plan FY2004-2011

    Science.gov (United States)

    2004-01-26

    Janushkowsky (STRATCOM), Maj Gen Stenner (SOUTHCOM), LTC Butts (TRANSCOM) Campaign Plan; J9 UpdateFace to Face Conference12 Feb 2003 COL (P) Verbeck (EUCOM... Stenner (SOUTHCOM), Ms. Young (TRANSCOM), MG Higgins (USFK), Dr. Hanley (OSD-OFT), RADM Gallagher (ACT) Combatant Commander Attendees IWS IWS VTC

  7. LANL FY11 activities(u)

    Energy Technology Data Exchange (ETDEWEB)

    Aragon, Ezekiel D [Los Alamos National Laboratory

    2011-01-06

    Briefings presenting W78 programmatic activities for FY11 and the status and plan for associated Hydro 3617, is included wherewith in support of the NNSA W78 Program Review Meetings scheduled for January 11 thru 13, 2011, at the Savannah River Plant, SC.

  8. 2002-2004 Business Plan of the IMO

    International Nuclear Information System (INIS)

    2001-10-01

    The province of Ontario plans to launch its restructured, competitive wholesale electricity market in the spring of 2002. This Business Plan of the IMO presents a detailed blueprint for its operation following the opening of that market. The report has 8 chapters including a summary and appendices. The chapters deal with many issues including: (1) the 2004 Business Plan in the context of 2002, (2) the IMO business service, (3) performance management, (4) IMO resource requirements and staffing, (5) revenue resources and associated regulatory approvals, and (6) financial policies and Pro Forma statements. The report reflects the evolution of the IMO from a project-based organization to a customer-focused company whose goal is to improve collaboration among market participants. The IMO is seeking approval from the Ontario Energy Board (OEB) for its proposed revenue requirement of $153.9 million and proposed capital expenditure of $66.3 million. The IMO is also seeking approval for a usage fee of $0.959 per MWh that wholesale customers and market participants will have to pay for all energy withdrawn for use or sale under open competition. The IMOs operating costs are comparable to other market operators in the Northeastern United States. tabs., figs

  9. Southwestern Power Administration Annual Report 2004-2006

    Energy Technology Data Exchange (ETDEWEB)

    None

    2006-01-01

    Confidence Commitment Cooperation These are words that spring to mind regarding Southwestern Power Administration’s performance during fiscal years (FY) 2004-2006 By offering innovative, customer-oriented service, working to improve system reliability and efficiency, and partnering with customers and other Federal power stakeholders, Southwestern has certainly exhibited all three of these qualities during these challenging yet productive years In fact, our cooperative working relationships were critical to our success during the severe and widespread drought conditions which prevailed throughout Southwestern’s marketing area for much of 2005-2006 When we proposed a temporary energy deferral program, our customers came on board by voluntarily taking less Federal hydropower than they were entitled to, enabling us to preserve system storage and fulfill our contract obligations during the crucial summer months of 2006 The U S Army Corps of Engineers (Corps) also helped improve our drought situation by allowing Southwestern more operational flexibility on a regional level Despite the challenges this critical drought period presented, Southwestern remained committed to fulfilling our mission and strategic goals From FY 2004 through FY 2006, we marketed and delivered all available Federal hydropower while meeting and even exceeding the reliability standards of the North American Electric Reliability Corporation (NERC) Our Power Operations Training Center in Springfield, Missouri, was cited as an “Example of Excellence” during a NERC readiness audit in October 2006; and as we have every year since NERC began measuring, Southwestern far exceeded the accepted NERC compliance ratings for power system operations reliability Our commitment to excellence and accountability has kept our repayment goals on target as well Revenues were sufficient to repay all annual expenses and the required principal investment in the Federal hydropower facilities Furthermore, the original

  10. 2008 Enterprise Transition Plan (ETP)

    Science.gov (United States)

    2008-09-30

    environment, EMALL will need to mature to a business to business ( B2B ) model. The B2C model presents a web-based front-end for purchasers, whereas the... B2B model would use the ERP as the front-end for the purchaser. This would allow a high level of inter-operability between the ERP and the B2B ...Q4 FY08 The successful implementation of JCCS into Iraq and Afghanistan resulted in the rapid increase in companies registered in the system during

  11. Training report of the FBR cycle training facility in 2004FY

    International Nuclear Information System (INIS)

    Watanabe, Toshio; Sasaki, Kazuichi; Sawada, Makoto; Ohtsuka, Jirou

    2004-07-01

    The FBR cycle training facility consists of sodium handling training facility and maintenance training facility, and is being contributed to train for the operators and maintenance workers of the prototype fast breeder reactor 'Monju'. So far, some training courses have been added to the both training courses of sodium handling technologies maintenance technologies in every year in order to carry out be significant training for preparation of Monju restarting. As encouragement of the sodium handling technology training in 2003FY, the sodium heat transfer basic course was equipped as the 9th sodium handling training course with the aims of learning basic principal technology regarding sodium heat transfer. While, for the maintenance training course, a named 'Monju Systems Learning Training Course', which aims to learn necessary knowledge as the engineers related Monju development, was provided newly in this year as an improvement concerned the maintenance course. In 2003FY, nine sodium handling technology training courses were carried out total 33 times and 235 trainees took part in those training courses. Also, nine training courses concerning the maintenance technology held 15 times and total 113 trainees participated. On the other hand, the 4th special lecture related sodium technology by France sodium school instructor was held on Mar. 15-17 and 34 trainees participated. Consequently, a cumulative trainees since October in 2000 opened the FBR cycle training facility reached to 1,236 so far. (author)

  12. Emergency response planning in hospitals, United States: 2003-2004.

    Science.gov (United States)

    Niska, Richard W; Burt, Catharine W

    2007-08-20

    This study presents baseline data to determine which hospital characteristics are associated with preparedness for terrorism and natural disaster in the areas of emergency response planning and availability of equipment and specialized care units. Information from the Bioterrorism and Mass Casualty Preparedness Supplements to the 2003 and 2004 National Hospital Ambulatory Medical Care Surveys was used to provide national estimates of variations in hospital emergency response plans and resources by residency and medical school affiliation, hospital size, ownership, metropolitan statistical area status, and Joint Commission accreditation. Of 874 sampled hospitals with emergency or outpatient departments, 739 responded for an 84.6 percent response rate. Estimates are presented with 95 percent confidence intervals. About 92 percent of hospitals had revised their emergency response plans since September 11, 2001, but only about 63 percent had addressed natural disasters and biological, chemical, radiological, and explosive terrorism in those plans. Only about 9 percent of hospitals had provided for all 10 of the response plan components studied. Hospitals had a mean of about 14 personal protective suits, 21 critical care beds, 12 mechanical ventilators, 7 negative pressure isolation rooms, and 2 decontamination showers each. Hospital bed capacity was the factor most consistently associated with emergency response planning and availability of resources.

  13. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  14. Oak Ridge TNS Program: summary of FY 1978 activities

    International Nuclear Information System (INIS)

    Steiner, D.; Becraft, W.R.; Brown, T.G.

    1979-07-01

    The Next Step (TNS) represents the stage of fusion energy development in which the major emphasis is on engineering testing and demonstration. In this document, the activities of the Oak Ridge TNS Program for FY 1978 are described and summarized. The Reference Design that has evolved from these activities is described, its operating characteristics are examined, and project planning issues are considered. Major conclusions from the FY 1978 effort are stated

  15. Laboratory Directed Research and Development Program FY2011

    Energy Technology Data Exchange (ETDEWEB)

    none, none

    2012-04-27

    Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2011 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). Going forward in FY 2012, the LDRD program also supports the Goals codified in the new DOE Strategic Plan of May, 2011. The LDRD program also supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Brief summares of projects and accomplishments for the period for each division are included.

  16. Command, Control, Communication, Computers and Information Technology (C4&IT). Strategic Plan, FY2008 - 2012

    National Research Council Canada - National Science Library

    2008-01-01

    ...&IT)/CG-6, Chief Information Officer (CIO), for the Coast Guard publishes this C4&IT Strategic Plan. The purpose of this plan is to provide a unifying strategy to better integrate and synchronize Coast Guard C4...

  17. Optimal imaging for treaty verification FY2014 annual report

    International Nuclear Information System (INIS)

    Hilton, Nathan R.; Johnson, William C.; Brubaker, Erik M.; Kupinski, Matthew Alan; MacGahan, Christopher Jonathan

    2014-01-01

    FY2014 technical report of our project funded by DNN R&D that leverages advanced inference methods developed for medical and adaptive imaging to address arms control applications. We seek a method to acquire and analyze imaging data of declared treaty-accountable items without creating an image of those objects or otherwise storing or revealing any classified information. Such a method would avoid the use of classified-information barriers. We present our progress on FY2014 tasks defined in our life-cycle plan. We also describe some future work that is part of the continuation of this project in FY2015 and beyond as part of a venture that joins ours with a related PNNL project.

  18. Optimal imaging for treaty verification FY2014 annual report

    Energy Technology Data Exchange (ETDEWEB)

    Hilton, Nathan R. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Johnson, William C. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Brubaker, Erik M. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Kupinski, Matthew Alan [Univ. of Arizona, Tucson, AZ (United States); MacGahan, Christopher Jonathan [Univ. of Arizona, Tucson, AZ (United States)

    2014-10-01

    FY2014 technical report of our project funded by DNN R&D that leverages advanced inference methods developed for medical and adaptive imaging to address arms control applications. We seek a method to acquire and analyze imaging data of declared treaty-accountable items without creating an image of those objects or otherwise storing or revealing any classified information. Such a method would avoid the use of classified-information barriers. We present our progress on FY2014 tasks defined in our life-cycle plan. We also describe some future work that is part of the continuation of this project in FY2015 and beyond as part of a venture that joins ours with a related PNNL project.

  19. GAMBARAN DISTRIBUSI RABIES DI KABUPATEN SIKKA PROVINSI NUSA TENGGARA TIMUR 2004-2008

    Directory of Open Access Journals (Sweden)

    Fridolina Mau

    2013-09-01

    Full Text Available AbstractRabies has long been known as one of the major public healht problems in Sikka district, East Nusa Tenggara Province,Indonesia. Flores is an isolated preveiously rabies- free. It started with the importation of three dogs from rabies endemicSulawesi in September 1997. The rabies virus is present in the saliva of infected animals; all warm-blooded animals aresusceptible to rabies, and some may serve as natural reservoirs of the virus. Rabies is still a problem for world healthincluding Indonesia. Data of deathcase of rabies (lyssa in Indonesia register 125 cases each year. Rabies in Indonesia is aserious health problem because almost fatal after clinical symptom of the disease with death rate of 100%. Since 2004 toDecember 2009 rabies spread to 24 provinces in East Nusa Tenggara Province. Number of cases due to bite of a mad dogwas 16.000 cases. The aim of this study is to know distribution of rabies casse and the main control measures isimmunizing dogs. Tipe of this study is cross sectional. The result of this study showed the improvement in the last five years(2004 until August 2008 of the occurences of dog bite in cases and human deaths highest in 128 cases (32,48% incommunity health centers Waipare and population dog highest in Kewapante subdistrict 7213 (26,27% although thecoverage of immunization was very low that was 2523 (10,77% out of 6210 population. In average the dog bite casesoccurred in April.Key Word; Description, Distribution, Rabies

  20. Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project: FY 1994--FY 2001

    International Nuclear Information System (INIS)

    1993-12-01

    This Waste Generation Forecast for DOE-ORO's Environmental Restoration OR-1 Project. FY 1994--FY 2001 is the third in a series of documents that report current estimates of the waste volumes expected to be generated as a result of Environmental Restoration activities at Department of Energy, Oak Ridge Operations Office (DOE-ORO), sites. Considered in the scope of this document are volumes of waste expected to be generated as a result of remedial action and decontamination and decommissioning activities taking place at these sites. Sites contributing to the total estimates make up the DOE-ORO Environmental Restoration OR-1 Project: the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Y-12 Plant, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and the off-site contaminated areas adjacent to the Oak Ridge facilities (collectively referred to as the Oak Ridge Reservation Off-Site area). Estimates are available for the entire fife of all waste generating activities. This document summarizes waste estimates forecasted for the 8-year period of FY 1994-FY 2001. Updates with varying degrees of change are expected throughout the refinement of restoration strategies currently in progress at each of the sites. Waste forecast data are relatively fluid, and this document represents remediation plans only as reported through September 1993

  1. Institutional plan FY 1998--FY 2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The Institutional Plan has been rearranged this year as a reflection of new Department of Energy (DOE) guidelines and to better illustrate the Laboratory`s mission-oriented focus. In Section 1 of this plan, the authors set forth their vision, mission, core competencies, strategic view, and related material. This section illustrates integration with the vision, mission, priorities, and core businesses of DOE. They define strategies, tactics, and guidelines and describe how they measure progress. In Section 2, they have elaborated on how they plan to address the Laboratory`s mission, describing programs and activities in the context of their role in this mission. Section 3 contains information on their approach to managing their business and operations. First they address the most critical issue safety. In this section, they confirm that Los Alamos is addressing the DOE critical success factors and describe the initiatives and plans that make their mission successful and leads them toward their vision. Section 4 contains details of their resources. 44 figs., 56 tabs.

  2. Defense Infrastructure: Opportunity to Improve the Timeliness of Future Overseas Planning Reports and Factors Affecting the Master Planning Effort for the Military Buildup on Guam

    National Research Council Canada - National Science Library

    Lepore, Brian J; Little, Mark; Alcoser, Nelsie; Jones, Mae; Lenane, Kate; Matta, Julia; Moon, Jamilah

    2008-01-01

    ... after the February 2008 budget submission, even though both the Senate and conference reports accompanying the fiscal year 2004 military construction bill require DOD to issue the plans with the military construction budget submission...

  3. The 20042008 dome-building eruption at Mount St. Helens, Washington: Epilogue

    Science.gov (United States)

    Dzurisin, Daniel; Moran, Seth C.; Lisowski, Michael; Schilling, Steve P.; Anderson, Kyle R.; Werner, Cynthia A.

    2015-01-01

    The 20042008 dome-building eruption at Mount St. Helens ended during winter 2007–2008 at a time when field observations were hampered by persistent bad weather. As a result, recognizing the end of the eruption was challenging—but important for scientists trying to understand how and why long-lived eruptions end and for public officials and land managers responsible for hazards mitigation and access restrictions. In hindsight, the end of the eruption was presaged by a slight increase in seismicity in December 2007 that culminated on January 12–13, 2008, with a burst of more than 500 events, most of which occurred in association with several tremor-like signals and a spasmodic burst of long-period earthquakes. At about the same time, a series of regular, localized, small-amplitude tilt events—thousands of which had been recorded during earlier phases of the eruption—came to an end. Thereafter, seismicity declined to 10–20 events per day until January 27–28, when a spasmodic burst of about 50 volcano-tectonic earthquakes occurred over a span of 3 h. This was followed by a brief return of repetitive “drumbeat” earthquakes that characterized much of the eruption. By January 31, however, seismicity had declined to 1–2 earthquakes per day, a rate similar to pre-eruption levels. We attribute the tilt and seismic observations to convulsive stagnation of a semisolid magma plug in the upper part of the conduit. The upward movement of the plug ceased when the excess driving pressure, which had gradually decreased throughout the eruption as a result of reservoir deflation and increasing overburden from the growing dome, was overcome by increasing friction as a result of cooling and crystallization of the plug.

  4. British Columbia Utilities Commission service plan 2004/2005 - 2006/2007

    International Nuclear Information System (INIS)

    2004-01-01

    The mandate of the British Columbia Utilities Commission (BCUC) is to ensure that customers receive safe, reliable and non-discriminatory energy services at fair rates from the utilities. It must also ensure that the shareholders of the utilities have a reasonable opportunity to earn a fair return on the invested capital. This report describes the following six key areas that underlie the Commission's strategic planning for the next 3 years: (1) regulation of automobile insurance, (2) energy policy implementation, (3) natural gas commodity costs, (4) commercial unbundling and customer choice, (5) energy trade, and (6) benchmarking. The report also describes strategic issues with reference to priorities, shifts and risk management. Alignment with the government's strategic plan was also reviewed. The financial outlook for 2003/04 and 2006/07 shows that the Commission intends to fully recover costs from the utilities it regulates. The budget for 2003/04 has increased somewhat from the forecasted amount for the same period reported in the previous year's service plan. This is due to an expanded mandate. Forecast values for the 2004/05 and 2005/06 planning periods have decreased slightly compared to the previous year's plan. tabs., figs

  5. Energy Technology Division research summary 2004

    International Nuclear Information System (INIS)

    Poeppel, R. B.; Shack, W. J.

    2004-01-01

    The Energy Technology (ET) Division provides materials and engineering technology support to a wide range of programs important to the US Department of Energy (DOE). The Division's capabilities are generally applied to technical issues associated with energy systems, biomedical engineering, transportation, and homeland security. Research related to the operational safety of commercial light water nuclear reactors (LWRs) for the US Nuclear Regulatory Commission (NRC) remains another significant area of interest for the Division. The pie chart below summarizes the ET sources of funding for FY 2004

  6. Canada-USA Salmon Shelf Survival Study, 2007-2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Trudel, Marc; Tucker, Strahan; Morris, John

    2009-03-09

    Historically, salmon stocks from the Columbia River and Snake River formed one of the most valuable fisheries on the west coast of North America. However, salmon and steelhead returns sharply declined during the 1980s and 1990s to reach nearly 1 million fish. Although several factors may be responsible for the decline of Columbia River salmon and steelhead, there is increasing evidence that these drastic declines were primarily attributable to persistently unfavorable ocean conditions. Hence, an understanding of the effects of ocean conditions on salmon production is required to forecast the return of salmon to the Columbia River basin and to assess the efficacy of mitigation measures such as flow regulation on salmon resources in this system. The Canadian Program on High Seas Salmon has been collecting juvenile salmon and oceanographic data off the west coast of British Columbia and Southeast Alaska since 1998 to assess the effects of ocean conditions on the distribution, migration, growth, and survival of Pacific salmon. Here, we present a summary of the work conducted as part of the Canada-USA Salmon Shelf Survival Study during the 2008 fiscal year and compare these results with those obtained from previous years. The working hypothesis of this research is that fast growth enhances the marine survival of salmon, either because fast growing fish quickly reach a size that is sufficient to successfully avoid predators, or because they accumulate enough energy reserves to better survive their first winter at sea, a period generally considered critical in the life cycle of salmon. Sea surface temperature decreased from FY05 to FY08, whereas, the summer biomass of phytoplankton increased steadily off the west coast of Vancouver Island from FY05 to FY08. As in FY07, zooplankton biomass was generally above average off the west coast of Vancouver Island in FY08. Interestingly, phytoplankton and zooplankton biomass were higher in FY08 than was expected from the observed

  7. U.S. Department of Education FY 2010 Summary of Performance and Financial Information

    Science.gov (United States)

    US Department of Education, 2011

    2011-01-01

    This paper presents the U.S. Department of Education's Fiscal Year (FY) "2010 Summary of Performance and Financial Information." FY 2010 was a transition year for the Department as it moves to a new strategic plan. The Department is still firmly committed to its mission of promoting achievement and preparation for global competitiveness…

  8. State Library Agency Survey: Fiscal Year 2008

    Science.gov (United States)

    Henderson, Everett; Miller, Kim; Farrell, Michele; Brock, Faye; Dorinski, Suzanne; Freeman, Michael; Frid, Lisa; Hardesty, Laura; Music, Christopher; O'Shea, Patricia; Sheckells, Cindy

    2009-01-01

    This report marks the third release of library statistics data from the Institute of Museum and Library Services (IMLS). It contains data on state library agencies in the 50 states and the District of Columbia for state fiscal year (FY) 2008. The data were collected through the State Library Agencies (StLA) Survey, the product of a cooperative…

  9. 2008 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2009-03-30

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site requires an annual review to assess the adequacy of the Performance Assessments (PAs) and Composite Analyses (CAs) for each of the facilities, with the results submitted annually to U.S. Department of Energy (DOE) Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan. The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) performed an annual review in fiscal year (FY) 2008 by evaluating operational factors and research results that impact the continuing validity of the PAs and CAs. This annual summary report presents data and conclusions from the FY 2008 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs.

  10. 2008 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    International Nuclear Information System (INIS)

    2009-01-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site requires an annual review to assess the adequacy of the Performance Assessments (PAs) and Composite Analyses (CAs) for each of the facilities, with the results submitted annually to U.S. Department of Energy (DOE) Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan. The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) performed an annual review in fiscal year (FY) 2008 by evaluating operational factors and research results that impact the continuing validity of the PAs and CAs. This annual summary report presents data and conclusions from the FY 2008 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R and D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R and D activities were reviewed to determine the adequacy of the CAs.

  11. FY08 VPP Program Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Dossett, Sharon D.

    2008-01-01

    The Voluntary Protection Program (VPP) is a recognized third-party certification of worker safety and health program excellence, based on industry best practices that focus on management leadership and employee involvement, as well as other safety and health program elements. This Pacific Northwest National Laboratory (PNNL) VPP Program Evaluation is the FY-2008 report of the PNNL VPP Steering Committee regarding the status of VPP at PNNL. It is an update of the previous annual report dated January, 2007 and was completed in January 2008. An annual evaluation of the status of VPP is required of all sites that participate in the DOE-VPP. This report provides a detailed summary of the PNNL VPP Steering Committee’s evaluation of program performance and documents both strengths and improvement opportunities related to the various aspects of the VPP model.

  12. O desafio da convivência: assessoria de diversidade e apoio aos cotistas (2004-2008 El desafío de la convivencia: asesoría de diversidad y apoyo a los cotizantes (2004-2008 The challenge of conviviality: advisory For diversity and support to quota holders (2004-2008

    Directory of Open Access Journals (Sweden)

    Jaqueline Gomes de Jesus

    2013-01-01

    Full Text Available Em 2003, a Universidade de Brasília adotou uma política de ações afirmativas para pessoas negras, o Sistema de Cotas para Negros. Em 2004, foi criada a Assessoria de Diversidade e Apoio aos Cotistas - ADAC. Ante à demanda do movimento social por uma sala de apoio aos estudantes, desenvolveu-se o Centro de Convivência Negra - CCN, espaço aberto a toda a comunidade acadêmica. O presente artigo apresenta a experiência da ADAC até 2008 e analisa os desafios da convivência entre estudantes cotistas e o espaço acadêmico a partir de pesquisa qualitativa sobre percepções, sentimentos e expectativas acerca do CCN, na forma de questionários com uma pergunta de evocação ao CCN, aplicados a 35 estudantes universitários oriundos do Sistema de Cotas para Negros frequentadores do CCN. Os dados de evocação foram analisados utilizando-se o software Evoc. Os resultados indicam que o CCN, no período analisado, era reconhecido por seus usuários como um espaço de acolhimento ante a uma organização acadêmica heterogênea, marcada por preconceitos. São discutidas as limitações e as possibilidades de intervenção a partir do uso do CCN, e uma agenda propositiva para a ADAC, com foco na gestão da diversidade.En 2003, la Universidad de Brasilia adoptó una política de acciones afirmativas para personas negras, el Sistema de Cotas para Negros. En 2004, fue creada la Asesoría de Diversidad y Apoyo a los Cotizantes - ADAC. Ante la demanda del movimiento social por una sala de apoyo a los estudiantes, se desarrolló el Centro de Convivencia Negra - CCN, espacio abierto a toda la comunidad académica. El presente artículo presenta la experiencia de la ADAC hasta 2008 y analiza los desafíos de la convivencia entre estudiantes cotizantes y el espacio académico a partir de una investigación cualitativa sobre percepciones, sentimientos y expectativas acerca del CCN, en la forma de cuestionarios con una pregunta de evocación al CCN, aplicados

  13. Using Organizational Philosophy to Create a Self-Sustaining Compensation Plan Without Harming Academic Missions.

    Science.gov (United States)

    Leverence, Robert; Nuttall, Richard; Palmer, Rachel; Segal, Mark; Wood, Alicia; Yancey, Fay; Shuster, Jonathon; Brantly, Mark; Hromas, Robert

    2017-08-01

    Academic physician reimbursement has moved to productivity-based compensation plans. To be sustainable, such plans must be self-funding. Additionally, unless research and education are appropriately valued, faculty involved in these efforts will become disillusioned, yet revenue generation in these activities is less robust than for clinical care activities. Faculty at the Department of Medicine, University of Florida Health, elected a committee of junior and senior faculty and division chiefs to restructure the compensation plan in fiscal year (FY) 2011. This committee was charged with designing a new compensation plan based on seven principles of organizational philosophy: equity, compensation coupled to productivity, authority aligned with responsibility, respect for all academic missions, transparency, professionalism, and self-funding in each academic mission. The new compensation plan was implemented in FY2013. A survey administered at the end of FY2015 showed that 61% (76/125) of faculty were more satisfied with this plan than the previous plan. Since the year before implementation, clinical relative value units per faculty increased 7% (from 3,458 in FY2012 to 3,704 in FY2015, P < .002), incentives paid per faculty increased 250% (from $3,191 in FY2012 to $11,153 in FY2015, P ≤ .001), and publications per faculty increased 15% (from 2.6 in FY2012 to 3.0 in FY2015, P < .001). Grant submissions, external funding, and teaching hours also increased per faculty but did not reach statistical significance. An important next step will be to incorporate quality metrics into the compensation plan, without affecting costs or throughput.

  14. Defense Finance and Accounting Service Work on the Navy Defense Business Operations Fund FY 1995 Financial Statements

    National Research Council Canada - National Science Library

    lane, F

    1996-01-01

    ... Financial Statements of the Navy Defense Business Operations Fund. We also planned to determine whether FY 1995 ending balances reported by DFAS Cleveland Center are usable as beginning balances for FY 1996 financial statements...

  15. FY16 Strategic Themes.

    Energy Technology Data Exchange (ETDEWEB)

    Leland, Robert W. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    I am pleased to present this summary of the Division 1000 Science and Technology Strategic Plan. This plan was created with considerable participation from all levels of management in Division 1000, and is intended to chart our course as we strive to contribute our very best in service of the greater Laboratory strategy. The plan is characterized by four strategic themes: Mission Engagement, Bold Outcomes, Collaborative Environment, and the Safety Imperative. Each theme is accompanied by a brief vision statement, several goals, and planned actions to support those goals throughout FY16. I want to be clear that this is not a strategy to be pursued in tension with the Laboratory strategic plan. Rather, it is intended to describe “how” we intend to show up for the “what” described in Sandia’s Strategic Plan. I welcome your feedback and look forward to our dialogue about these strategic themes. Please join me as we move forward to implement the plan in the coming year.

  16. Review of research on advanced computational science in FY2016

    International Nuclear Information System (INIS)

    2017-12-01

    Research on advanced computational science for nuclear applications, based on “Plan to Achieve Medium- to Long-term Objectives of the Japan Atomic Energy Agency (Medium- to Long-term Plan)”, has been performed at Center for Computational Science and e-Systems (CCSE), Japan Atomic Energy Agency. CCSE established the committee consisting of outside experts and authorities which does research evaluation and advices for the assistance of the research and development. This report summarizes the followings. (1) Results of the R and D performed at CCSE in FY 2016 (April 1st, 2016 - March 31st, 2017), (2) Results of the evaluation on the R and D by the committee in FY 2016. (author)

  17. Present status of refining and conversion facility dismantling. Progress in first half of 2010FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2011-06-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  18. Present status of refining and conversion facility dismantling. Progress in first half of 2009FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2010-03-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2009FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  19. FY-1981 project status for the Transuranic Waste Treatment Facility

    International Nuclear Information System (INIS)

    Benedetti, R.L.; Tait, T.D.

    1981-11-01

    The primary objective of the Transuranic Waste Treatment Facility (TWTF) Project is to provide a facility to process low-level transuranic waste stored at the Idaho National Engineering Laboratory (INEL) into a form acceptable for disposal at the Waste Isolation Pilot Plant. This report provides brief summary descriptions of the project objectives and background, project status through FY-1981, planned activities for FY-1982, and the EG and G TWTF Project office position on processing INEL transuranic waste

  20. Atmospheric 3H impact assessment (2004-2008) around Narora Atomic Power Station

    International Nuclear Information System (INIS)

    Kumar, A.; Gautam, Y.P.; Sharma, A.K.; Sharma, S.; Rao, K.S.; Kumar, J.; Kumar, V.; Singh, B.; Hedge, A.G.

    2010-01-01

    Atmospheric tritium activity is measured regularly around Narora Atomic Power Station (NAPS) since gaseous waste, which contains tritium, is being released through a 145 m high stack at NAPS site. Atmospheric data collected during 2004-2008 shows a large variation of 3 H concentration in air, fluctuating in the range of ≤0.2-91.6 Bq.m -3 . Significantly, higher tritium levels were measured in samples near the site boundary (1.6 km) of NAPS compared to off-site locations. The atmospheric dilution factor was found to be in the range of 1.1x10 -7 -7.3x10 -7 s.m -3 . The scavenging of NAPS site was found to be varying from 0.2x10 4 to 14.1x10 4 (Bq.m -3 rain water per Bqm -3 air). The inhalation dose to a member of general public at different distances (1.6-30 km) from NAPS site was found to be in the range of 0.21 μSv.y -1 . (author)

  1. Air quality analysis for the Western Area Power Administration's 2004 Power Marketing Plan Environmental Impact Statement

    International Nuclear Information System (INIS)

    Glantz, C.S.; Dagle, J.E.; Bilyard, G.R.

    1997-01-01

    The Western Area Power Administration (Western) markets and transmits electric power throughout 15 western states. Western's Sierra Nevada Customer Service Region (Sierra Nevada Region) markets approximately 1,480 megawatts (MW) of firm power (plus 100 MW of seasonal peaking capacity) from the Central Valley Project (CVP) and other resources. Western's mission is to sell and deliver electricity generated from these resources. Western's capacity and energy sales must be in conformance with the laws that govern its sale of electrical power. Further, Western's hydropower operations at each facility must comply with minimum and maximum flows and other constraints set by other regulatory agencies. The Sierra Nevada Region proposes to develop a marketing plan that defines the products and services it would offer beyond the year 2004 and the eligibility and allocation criteria for its electric power resources. Because determining levels of long-term firm power resources to be marketed and subsequently entering into contracts for the delivery of related products and services could be a major Federal action with potentially significant impacts to the human environment, the 2004 Power Marketing Plan Environmental Impact Statement (2004 EIS) is being prepared. Decisions made by the Sierra Nevada Region on how and when to supply power to its customers would influence the operation of power plants within the Western Systems Coordinating Council (WSCC). If the resources affected are thermal resources, this could in turn affect the amount, timing, and location of pollutant emissions to the air at locations throughout the western United States. This report has been produced in conjunction with the 2004 EIS to provide a more detailed discussion of the air quality implications of the 2004 power marketing plan

  2. Ectopic pregnancy morbidity and mortality in low-income women, 2004-2008.

    Science.gov (United States)

    Stulberg, D B; Cain, L; Dahlquist, I H; Lauderdale, D S

    2016-03-01

    Does the risk of adverse outcomes at the time of ectopic pregnancy vary by race/ethnicity among women receiving Medicaid, the public health insurance program for low-income people in the USA? Among Medicaid beneficiaries with ectopic pregnancy, 11% experienced at least one complication, and women from all racial/ethnic minority groups were significantly more likely than whites to experience complications. In this population of Medicaid recipients, African American women are significantly more likely than whites to experience ectopic pregnancy, but the risk of adverse outcomes has not previously been assessed. We conducted a cross-sectional observational study of all women (n = 19 135 106) ages 15-44 enrolled in Medicaid for any amount of time during 2004-2008 who lived in one of the following 14 US states: Arizona; California; Colorado; Florida; Illinois; Indiana; Iowa; Louisiana; Massachusetts; Michigan; Minnesota; Mississippi; New York; and Texas. We analyzed Medicaid claims records for inpatient and outpatient encounters and identified ectopic pregnancies with a principal diagnosis code for ectopic pregnancy from 2004-2008. We calculated the ectopic pregnancy complication rate as the number of ectopic pregnancies with at least one complication (blood transfusion, hysterectomy, any sterilization, or length-of-stay (LOS) > 2 days) divided by the total number of ectopic pregnancies. We used Poisson regression to assess the risk of ectopic pregnancy complication by race/ethnicity. Secondary outcomes were each individual complication, and ectopic pregnancy-related death. We calculated the ectopic pregnancy mortality ratio as the number of deaths divided by live births. Ectopic pregnancy-associated complications occurred in 11% of cases. Controlling for age and state, the risk of any complication was significantly higher among women who were black (incidence risk ratio [IRR] 1.47, 95% CI 1.43-1.53, P American Indian/Alaskan Native (IRR 1.34 95% CI 1.16-1.55, P white

  3. Repository Technology Program activities, FY 1988

    International Nuclear Information System (INIS)

    Yow, J.L. Jr.; Wijesinghe, A.M.; Thorpe, R.K.; Knapp, R.B.

    1989-07-01

    Our technical activities in FY 1988 included instrument selection and evaluation, calculational work, and simulator development. Near the end of the fiscal year, we began preparing several topical reports to document our results. This fiscal year, we continued developing three-dimensional numerical simulators to model coupled hydrologic-and mechanical-rock mass responses and, thus, to provide representative numerical tools for understanding and calculating these in situ processes. We also began scoping calculations in the second half of FY 1988 to evaluate ERE design criteria, but this work was redirected late in the year when the DOE/AECL Subsidiary Agreement was set aside. Our work in developing and evaluating experimental techniques focused on total pressure measurements, moisture content measurement, and tracer detection instrumentation for sealing experiments and for rock-mass-response field tests. At the end of the fiscal year, we completed a review of measurement technology for instrumenting migration/sorption tests to help define the technological requirements in these areas. By the end of FY 1988, we had completed a review of the existing codes for simulating reactive transport; we are using the results of this review to help formulate plans for future activities in this area. The following sections describe the major RTP tasks and activities at LLNL in more detail, and they include our FY 1988 accomplishments in these areas. 8 refs., 22 figs

  4. Environmental policy memorandum of the Dutch Ministry of Defence 2004; Defensie Milieubeleidsnota 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-01-01

    Starting point of the title memorandum is environmental sound operational management of the Ministry of Defence. In the memorandum 26 policy targets are formulated for the period 2004-2008 in the fields of climate and energy, noise, hazardous materials, environmental care, and biological diversity and nature. One of the projects concerns the participation in a wind turbine farm in the Dutch province Drenthe. [Dutch] Uitgangspunt van de nota is een milieuverantwoorde bedrijfsvoering. Na een grondige evaluatie van de Defensie Milieubeleidsnota (DMB) 2000 zijn in de DMB 2004 zo'n 26 doelstellingen geformuleerd tot en met het jaar 2008. De belangrijkste doelstellingen liggen op het gebied van klimaat en energie, geluid, gevaarlijke stoffen, afval, milieuzorg, en biodiversiteit en natuur. Een van de opvallendste projecten uit DMB 2004 is een windturbinepark in Drenthe. Defensie gaat daarbij deelnemen aan een provinciaal project op en naast het magazijnencomplex te Coevorden. Van acht a negen te plaatsen turbines, die elk 2 MegaWatt elektriciteit gaan opwekken, zal het ministerie van Defensie er zes voor zijn rekening nemen. Dat betekent een investering van ruim 19 miljoen euro. Deze investering wordt echter binnen tien jaar geheel terugverdiend. Het turbinepark past in de doelstelling dat bij Defensie, conform het Rijksbeleid, eind 2008 zo'n 75% van het elektriciteitsverbruik duurzaam wordt opgewekt.

  5. The investigation of identifying method on grass fire by FY-3 VIRR images

    Science.gov (United States)

    Jiang, Youyan; Han, Tao; Wang, Dawei

    2018-03-01

    Grassland fire has the characteristics of fierce fire and rapid spreading, and many fires occur in sparsely populated places. Satellite remote sensing has the characteristics of fast imaging period and wide coverage, and plays an important role in the rapid monitoring and evaluation of grassland fire. FY-3 satellite has been widely used since its launch in September 2008, and this paper uses the fire information of Gansu grassland from 2011 to 2016, based on the more mature MODIS and NOAA-AVHRR fire identification method. The results show that the accuracy of FY-3/VIRR satellite data fire detection are higher than that of NOAA-AVHRR satellite, and the accuracy of FY-3/VIRR satellite data is described. There is a greater improvement, the ability to identify slightly worse than the MODIS satellite, the region is relatively large fire detection accuracy is higher.

  6. Impacto de los subsidios a la investigación en la productividad científica : Argentina 2004-2008

    OpenAIRE

    Vázquez, Claudia

    2015-01-01

    El objetivo de este trabajo consiste en evaluar el impacto de un programa de subsidios a la investigación. En particular, se evalúan las convocatorias 2004 a 2008 de los Proyectos de Investigación Científica y Tecnológica (PICT), el principal instrumento de apoyo a la investigación científica dentro de la ANPCyT de Argentina. Siguiendo a la literatura, las variables de resultado se basan en indicadores bibliométricos construidos a partir de la base de datos SCOPUS. Se encuentra que el program...

  7. The Seismic Category I Structures Program results for FY 1987

    International Nuclear Information System (INIS)

    Farrar, C.R.; Bennett, J.G.; Dunwoody, W.E.; Baker, W.E.

    1990-10-01

    The accomplishments of the Seismic Category I Structures Program for FY 1987 are summarized. These accomplishments include the quasi-static load cycle testing of large shear wall elements, an extensive analysis of previous data to determine if equivalent linear analytical models can predict the response of damaged shear wall structures, and code committee activities. In addition, previous testing and results that led to the FY 1987 program plan are discussed and all previous data relating to shear wall stiffness are summarized. Because separate reports have already summarized the experimental and analytical work in FY 1987, this report will briefly highlight this work and the appropriate reports will be references for a more detailed discussion. 12 refs., 23 figs., 18 tabs

  8. Review of research on advanced computational science in FY2015

    International Nuclear Information System (INIS)

    2017-01-01

    Research on advanced computational science for nuclear applications, based on 'Plan to Achieve Medium- to Long-term Objectives of the Japan Atomic Energy Agency (Medium- to Long-term Plan)', has been performed at Center for Computational Science and e-Systems (CCSE), Japan Atomic Energy Agency. CCSE established the committee consisting of outside experts and authorities which does research evaluation and advices for the assistance of the research and development. This report summarizes the followings. (1) Results of the R and D performed at CCSE in FY 2015 (April 1st, 2015 - March 31st, 2016), (2) Results of the evaluation on the R and D by the committee in FY 2015 (April 1st, 2015 - March 31st, 2016). (author)

  9. [Scientific articles in the Icelandic Medical Journal 2004-2008: an overview].

    Science.gov (United States)

    Gudbjartsson, Tómas; Sigurdsson, Engilbert

    2009-10-01

    In the past 5 years the Icelandic Medical Journal has undergone many changes during a period of flourishing research in Iceland. The process of reviewing and editing scientific articles has been revised since the Journal joined the Medline database in 2005 and the proportion of rejected articles has risen. New columns have been launched covering medical history, professionalism, ethics and hobbies of the medical profession. We categorized all scientific articles from the period 2004-2008, that is research articles, review articles, case reports and clinical guidelines, according to types of articles and to which medical speciality or subspeciality the publication should belong. The number of scientific articles rose during the period but the number of research articles remained around 20 most years during the period. The relative proportion of research articles therefore fell whereas the number and proportion of review articles and case reports increased. Clinical guidelines ceased to appear in the Journal. The contribution of individual specialities to the Journal varied widely. Researchers amongst doctors and related professions need be encouraged to submit scientific articles to the Journal. The publication of scientific articles in English in the web-based form of the Journal may prove to be stimulating in this regard for Icelandic doctors abroad as well as for some researchers in Iceland.

  10. RESULTS OF TRITIUM TRACKING AND GROUNDWATER MONITORING AT THE HANFORD SITE 200 AREA STATE APPROVED LAND DISPOSAL SITE. FISCAL YEAR 2008

    International Nuclear Information System (INIS)

    Erb, D.B.

    2008-01-01

    The Hanford Site's 200 Area Effluent Treatment Facility (ETF) processes contaminated aqueous wastes derived from Hanford Site facilities. The treated wastewater occasionally contains tritium, which cannot be removed by the ETF prior to the wastewater being discharged to the 200 Area State-Approved Land Disposal Site (SALDS). During the first 11 months of fiscal year 2008 (FY08) (September 1, 2007, to July 31, 2008), approximately 75.15 million L (19.85 million gal) of water were discharged to the SALDS. Groundwater monitoring for tritium and other constituents, as well as water-level measurements, is required for the SALDS by State Waste Discharge Permit Number ST-4500 (Ecology 2000). The current monitoring network consists of three proximal (compliance) monitoring wells and nine tritium-tracking wells. Quarterly sampling of the proximal wells occurred in October 2007 and in January/February 2008, April 2008, and August 2008. The nine tritium-tracking wells, including groundwater monitoring wells located upgradient and downgradient of the SALDS, were sampled in January through April 2008. Water-level measurements taken in the three proximal SALDS wells indicate that a small groundwater mound is present beneath the facility, which is a result of operational discharges. The mound increased in FY08 due to increased ETF discharges from treating groundwater from extraction wells at the 200-UP-l Operable Unit and the 241-T Tank Farm. Maximum tritium activities increased by an order of magnitude at well 699-48-77A (to 820,000 pCi/L in April 2008) but remained unchanged in the other two proximal wells. The increase was due to higher quantities of tritium in wastewaters that were treated and discharged in FY07 beginning to appear at the proximal wells. The FY08 tritium activities for the other two proximal wells were 68,000 pCi/L at well 699-48-77C (October 2007) and 120,000 pCi/L at well 699-48-77D (October 2007). To date, no indications of a tritium incursion from the

  11. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  12. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    International Nuclear Information System (INIS)

    1992-01-01

    This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixth sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail

  13. Fiscal Year 2015 Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Monica Rene [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-16

    Los Alamos National Laboratory is taking action to operate as a living laboratory for sustainable solutions in buildings, climate, energy, purchasing, transportation, waste, and water. LANL prepared the fiscal year (FY) 2015 Site Sustainability Plan (SSP) to describe progress towards the goals established in the SSPP. In addition, per the requirements of DOE Order 436.1, Departmental Sustainability, Los Alamos National Laboratory (LANL) uses its International Organization for Standardization (ISO) 14001:2004 certified Environmental Management System (EMS) to establish objectives to improve compliance, reduce environmental impacts, increase operational capacity, and meet long-term sustainability goals. The goals of the 2015 SSP are fully integrated into LANL’s institutional environmental objectives under the EMS and its Long-Term Strategy for Environmental Stewardship & Sustainability (LTSESS).

  14. FY17 Strategic Themes.

    Energy Technology Data Exchange (ETDEWEB)

    Leland, Robert W. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    I am pleased to present this summary of the FY17 Division 1000 Science and Technology Strategic Plan. As this plan represents a continuation of the work we started last year, the four strategic themes (Mission Engagement, Bold Outcomes, Collaborative Environment, and Safety Imperative) remain the same, along with many of the goals. You will see most of the changes in the actions listed for each goal: We completed some actions, modified others, and added a few new ones. As I’ve stated previously, this is not a strategy to be pursued in tension with the Laboratory strategic plan. The Division 1000 strategic plan is intended to chart our course as we strive to contribute our very best in service of the greater Laboratory strategy. I welcome your feedback and look forward to our dialogue about these strategic themes. Please join me as we move forward to implement the plan in the coming months.

  15. Department of the Army - The Fiscal Year 2008 Military Personnel, Army Appropriation and the Antideficiency Act

    Science.gov (United States)

    2010-06-22

    of the Army, U.S. Army Audit Agency, Budgeting for the Military Personnel, Army Appropriation, Report No. A-2010-0028- FFM (Jan. 6, 2010); Department...of the Army, U.S. Army Audit Agency, Military Personnel, Army FY 05 Subsistence Charges, Report No. A-2008-0037- FFM (Feb. 12, 2008); Department of

  16. LBNL Laboratory Directed Research and Development Program FY2016

    Energy Technology Data Exchange (ETDEWEB)

    Ho, D.

    2017-03-01

    The Berkeley Lab Laboratory Directed Research and Development Program FY2016 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the LDRD program planning and documentation process that includes an annual planning cycle, project selection, implementation and review.

  17. Concentrations and loads of nutrients in the tributaries of the Lake Okeechobee watershed, south-central Florida, water years 2004-2008

    Science.gov (United States)

    Byrne, Michael J.; Wood, Molly S.

    2011-01-01

    Lake Okeechobee in south-central Florida is the second largest freshwater lake in the contiguous United States. Excessive phosphorus loading, harmful high and low water levels, and rapid expansion of non-native vegetation have threatened the health of the lake in recent decades. A study was conducted to monitor discharge and nutrient concentrations from selected tributaries into Lake Okeechobee and to evaluate nutrient loads. The data analysis was performed at 16 monitoring stations from December 2003 to September 2008. Annual and seasonal discharge measured at monitoring stations is affected by rainfall. Hurricanes affected three wet years (2004, 2005, and the latter part of 2008) and resulted in substantially greater discharge than the drought years of 2006, 2007, and the early part of 2008. Rainfall supplies about 50 percent of the water to Lake Okeechobee, discharge from the Kissimmee River supplies about 25 percent, and discharge from tributaries and groundwater seepage along the lake perimeter collectively provide the remaining 25 percent. Annually, tributary discharge from basins located on the west side of the Kissimmee River is about 5 to 6 times greater than that from basins located on the east side. For the purposes of this study, the basins on the east side of the Kissimmee River are called "priority basins" because of elevated phosphorus concentrations, while those on the west side are called "nonpriority" basins. Total annual discharge in the non-priority basins ranged from 245,000 acre-feet (acre-ft) in 2007 to 1,322,000 acre-ft in 2005, while annual discharge from the priority basins ranged from 41,000 acre-ft in 2007 to 219,000 acre-ft in 2005. Mean total phosphorus concentrations ranged from 0.10 to 0.54 milligrams per liter (mg/L) at the 16 tributaries during 20042008. Mean concentrations were significantly higher at priority basin sites than at non-priority basin sites, particularly at Arbuckle Creek and C 41A Canal. Concentrations of organic

  18. Legislative Branch: FY2014 Appropriations

    Science.gov (United States)

    2013-11-25

    for the renovation of the Cannon House Office Building and the condition of the Rayburn building, the effect of the sequester on overtime work, plans...provided by the Joint Committee on Taxation for all revenue legislation (Balanced Budget and Emergency Deficit Control Act of 1985, P.L. 99-177...Committee, the Joint Committee on Taxation , the Office of the Attending Physician, and the Office of Congressional Accessibility Services. The FY2012

  19. The extended teamwork 2004/2005 exploratory study. Study plan

    International Nuclear Information System (INIS)

    Skjerve, Ann Britt; Strand, Stine; Skraaning, Gyrd Jr.; Nihlwing, Christer; Helgar, Stein; Olsen, Asle; Kvilesjoe, Hans Oeyvind; Meyer, Geir; Droeivoldsmo, Asgeir; Svengren, Haakan

    2005-09-01

    The report documents the study plan for the Extended Teamwork 2004/2005 exploratory study, which is performed within the Extended Teamwork HRP research program. The purpose of the research program is to generate ideas on how teamwork in nuclear power plants may be affected by the introduction of new operational concepts. The Extended Teamwork 2004/2005 exploratory study contributes with empirical knowledge on the effect of a new operational concept, implying increased automation levels, changed operator roles, redefined competence requirements to the operators, and new technologies to support co-operation, on teamwork. The Extended Teamwork 2004/2005 exploratory study covered occurrences during the early transition phase, i.e., from the time the operators are introduced to the possible future operational environment, to the time they have completed the twelve scenarios comprised by the study. The study assessed how familiarity with operation in the possible future operational environment may affect the extent and quality of co-operation. The report accounts for the motivation for performing the exploratory study, and explains the research question. It describes the theoretical approach, which is based on Co-operation Theory, the human-centered automation approach, and theories on co-operation across distances, and introduces the concept extended teamwork. It also describes the method applied: it provides a detailed description of the possible future operational environment, including requirements with respect to autonomy and authority - both for humans and for automatic agents, and describes the technology applied to support co-operation in the control-room team. In addition, all measurement techniques applied in the study are accounted for (system logs, questionnaires, interviews, etc.). (Author)

  20. NREL Photovoltaic Program FY 1996 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    1997-08-01

    This report summarizes the in-house and subcontract research and development (R&D) activities under the National Renewable Energy Laboratory (NREL) Photovoltaics (PV) Program from October 1, 1995 through September 30, 1996 (fiscal year [FY] 1996). The NREL PV Program is part of the U.S. Department of Energy's (DOE) National Photovoltaics Program, as described in the DOE Photovoltaics Program Plan, FY 1991 - FY 1995. The mission of the DOE National Photovoltaics Program is to: "Work in partnership with U.S. industry to develop and deploy photovoltaic technology for generating economically competitive electric power, making photovoltaics an important contributor to the nation's and the world's energy use and environmental improvement. The two primary goals of the national program are to (1) maintain the U.S. PV industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NREL PV Program provides leadership and support to the national program toward achieving its mission and goals.

  1. Hanford Site Environment Safety and Health (ES and H) FY 1999 and FY 2000 Execution Commitment Summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    1999-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the S&H resources that support these activities. The fiscal year (FY) 1999 and 2000 information (Sieracki 1999) and data contained in the ''Hanford Site Environment, Safety and Health Fiscal Year 2001 Budget-Risk Management Summary'' (RL 1999) were the basis for preparing this report. Fiscal year 2000 finding of Office of Environmental Management (EM) and Office of Nuclear Energy, Science and Technology (NE) activities is based on the President's budget of $1,065.1 million and $28.0 million, plus $2.7 million carryover finding, respectively, as of October 31, 1999. Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2002 ES&H Budget-Risk Management Summary to be issued in May 2000. This report provides the end-of-year status of FY 1999 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2000 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H ''Guidance for FY200l Budget Formulations and Execution'' (DOE 1999).

  2. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  3. Nevada Nuclear Waste Storage Investigations. FY 1979 peer review summaries and related documentation

    International Nuclear Information System (INIS)

    1980-06-01

    The NNWSI FY 1979 Project Plan (NVO-196-9) describes the accomplishment plan and objectives of the FY 1979 investigations. Three critical tasks and one critical subtask were selected by Project management for in-depth external peer review at meetings held at the DOE/NV in Las Vegas. The four technical peer review meetings held during FY 1979 were conducted to obtain an external assessment of the sufficiency and quality of the four selected critical investigative segments of the NNWSI. Peer reviewers representing appropriate fields of expertise were invited to attend each meeting. Within about two weeks of each meeting, the invited reviewers summarized their impressions of the technical activities presented to them and transmitted their summaries and recommendations to DOE/NV by letter. This document is a compilation, according to the individual meetings, of all correspondence between reviewers and Project personnel that is relevant to the technical activities of the NNWSI. The section for each meeting briefly summarizes the major activities of the NNWSI being reviewed and the effects of the reviewers comments and recommendations on Project planning. Each section also includes a list of the invited peer reviewers, a meeting agenda, and a copy of all technical correspondence relating to the review meeting. General impressions of the overall peer review process and improvements to be incorporated into future peer review activities are discussed in the next section as an introduction to the four subsequent sections which are devoted to the individual FY 1979 peer reviews

  4. Nevada Test Site-Directed Research and Development, FY 2007 Report

    International Nuclear Information System (INIS)

    Wil Lewis, editor

    2008-01-01

    The Nevada Test Site-Directed Research and Development (SDRD) program completed a very successful year of research and development activities in FY 2007. Twenty-nine new projects were selected for funding this year, and eight projects started in FY 2006 were brought to conclusion. The total funds expended by the SDRD program were $5.67 million, for an average per-project cost of $153 thousand. An external audit conducted in September 2007 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: programmatic adoption of 8 SDRD-developed technologies; the filing of 9 invention disclosures for innovation evolving from SDRD projects; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD Symposium that was broadly attended by Nevada Test Site (NTS), National Nuclear Security Administration (NNSA), LDRD, U.S. Department of Homeland Security (DHS), and U.S. Department of Defense (DoD) representatives; peer reviews of all FY 2007 projects; and the successful completion of 37 R and D projects, as presented in this report. In response to a company-wide call, authors throughout the NTS complex submitted 182 proposals for FY 2007 SDRD projects. The SDRD program has seen a dramatic increase in the yearly total of submitted proposals--from 69 in FY 2002 to 182 this year--while the number of projects funded has actually decreased from a program high of 57 in FY 2004. The overall effect of this trend has helped ensure an increasingly competitive program that benefited from a broader set of innovative ideas, making project selection both challenging and rewarding. Proposals were evaluated for technical merit, including such factors as innovation, probability of success, potential benefit, and mission applicability. Authors and reviewers benefited from the use of a shortfalls list entitled the 'NTS Technology Needs Assessment' that was compiled from NTS, National Weapons Laboratory (NWL

  5. Nevada Test Site-Directed Research and Development, FY 2007 Report

    Energy Technology Data Exchange (ETDEWEB)

    Wil Lewis, editor

    2008-02-20

    The Nevada Test Site-Directed Research and Development (SDRD) program completed a very successful year of research and development activities in FY 2007. Twenty-nine new projects were selected for funding this year, and eight projects started in FY 2006 were brought to conclusion. The total funds expended by the SDRD program were $5.67 million, for an average per-project cost of $153 thousand. An external audit conducted in September 2007 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: programmatic adoption of 8 SDRD-developed technologies; the filing of 9 invention disclosures for innovation evolving from SDRD projects; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD Symposium that was broadly attended by Nevada Test Site (NTS), National Nuclear Security Administration (NNSA), LDRD, U.S. Department of Homeland Security (DHS), and U.S. Department of Defense (DoD) representatives; peer reviews of all FY 2007 projects; and the successful completion of 37 R&D projects, as presented in this report. In response to a company-wide call, authors throughout the NTS complex submitted 182 proposals for FY 2007 SDRD projects. The SDRD program has seen a dramatic increase in the yearly total of submitted proposals--from 69 in FY 2002 to 182 this year--while the number of projects funded has actually decreased from a program high of 57 in FY 2004. The overall effect of this trend has helped ensure an increasingly competitive program that benefited from a broader set of innovative ideas, making project selection both challenging and rewarding. Proposals were evaluated for technical merit, including such factors as innovation, probability of success, potential benefit, and mission applicability. Authors and reviewers benefited from the use of a shortfalls list entitled the 'NTS Technology Needs Assessment' that was compiled from NTS, National Weapons Laboratory

  6. Krsko Nuclear Power Plant's Environmental Management System in Compliance with ISO 14001:2004

    International Nuclear Information System (INIS)

    Kusar, A.; Kavsek, D.

    2010-01-01

    Krsko Nuclear Power Plant (NPP) pays special attention to environmental protection and practices environmental safety in all plant processes and management. In 2008, Krsko NPP introduced the Environmental Management System in compliance with ISO 14001:2004 standard. The plant management announced the Environmental policy which is a part of the business strategy of Krsko NPP which is an eco-friendly company. The Policy is a commitment of the plant management and all staff to act in compliance with requirements of ISO 14001:2004. The standard served as a basis for developing some new documentation such as Environmental Management System Quality Manual, Environmental planning procedures identifying legal and other requirements, Register of environmental aspects, Register of legal and other requirements etc. When establishing the Register of environmental aspects, all possible environmental impacts of the plant were carefully reviewed and estimated. Following the introduction and certification audit in October and December 2008 of Bureau Veritas Certification, Krsko NPP was awarded certificate ISO 14001:2004 attesting conformity of its Environmental Management System with this standard. The Environmental Certificate means that Krsko NPP will promote a positive environmental culture and maintain a safe, healthy and environmentally-sound workplace for all its employees, contractors and visitors.(author).

  7. Geothermal-subsidence research program plan and review

    Energy Technology Data Exchange (ETDEWEB)

    Goldstein, N.E.; Noble, J.E.; Simkin, T.L.

    1980-09-01

    The revised Geothermal Subsidence Research Plan (GSRP) presented here is the result of two years of research based on the recommendations of a technical advisory committee and on the DOE/DGE's wish to include specific components applicable to the geopressure resources on the Gulf Coast. This revised plan describes events leading up to FY 1979 and 1980 and the resulting research activities completed for that period. At the time of this writing most of the projects are completed; this document summarizes the accomplishments of the GSRP during FY 1979 and 1980 and includes recommendations for the FY 1981 and 1982 programs.

  8. Hearth monitoring project annual report for FY-1981

    International Nuclear Information System (INIS)

    Nieschmidt, E.B.; Lawrence, R.S.

    1981-08-01

    Progress during FY 1981 in the Hearth Monitoring project for the Idaho National Engineering Laboratory Transuranic Waste Treatment Facility is reported. Results of calculational, experimental and instrumental phases of the program are presented. Recommendations and plans for continuation of the program are displayed. Schedules for future efforts are included

  9. Exposição ocupacional por material biológico no Hospital Santa Casa de Pelotas - 2004 a 2008 La exposición ocupacional a material biológico en el Hospital Santa Casa de Pelotas - 2004 a 2008 Occupational exposure to biological material at the Hospital Santa Casa de Pelotas - 2004 to 2008

    Directory of Open Access Journals (Sweden)

    Lílian Moura de Lima

    2011-03-01

    Full Text Available A pesquisa trata de exposições ocupacionais por material biológico a que foram submetidos os profissionais de saúde, no Hospital Santa Casa de Misericórdia de Pelotas, no período de janeiro de 2004 a junho de 2008. Trata-se de um estudo transversal, descritivo, com abordagem quantitativa. Utilizou-se como instrumento de pesquisa um questionário elaborado com base na ficha de notificação de acidente de trabalho da referida instituição. Os dados foram digitados e analisados no programa Epi-info 6.04. Como principal resultado encontrou-se a maior ocorrência de acidentes de trabalho com material biológico entre os profissionais técnicos em enfermagem do sexo feminino (38,6%, com idade de 21 a 30 anos (53,9%. A maioria dos acidentes aconteceu através de lesões com perfurocortantes (82,2%, sendo 24,1% no Centro Cirúrgico e 84,5% envolvendo sangue. Conclui-se que o estudo é de extrema relevância, pois, com base no reconhecimento do tipo de acidentes mais frequentes, pode-se conhecer os riscos existentes e intervir na sua redução, por meio de ações preventivas que beneficiem o trabalhador e a instituição.El estudio aborda la exposición ocupacional a material biológico a que fueron sometidos los profesionales de salud en el Hospital Santa Casa de Misericordia de Pelotas, de enero de 2004 a junio de 2008. Este es un corte transversal, descriptivo y cuantitativo. Se utiliza como herramienta de investigación un cuestionario basado en el formulario de informe de accidente de trabajo de esa institución. Los datos fueron introducidos y analizados con Epi-Info 6.04. Como principal resultado se encontró una mayor incidencia de accidentes con material biológico entre los profesionales técnicos de enfermería del sexo femenino (38,6%, de 21 años a 30 años (53,9%. La mayoría de los accidentes ocurrió a través de lesiones con objetos punzantes (82,2%, siendo que 24,1% ocurrió en el Centro Quirúrgico, y 84,5% con sangre. Se

  10. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixth sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.

  11. Climate plan 2004

    International Nuclear Information System (INIS)

    2004-01-01

    The Climate Plan is an action plan drawn up by the French Government to respond to the climate change challenge, first by 2010 (complying with the Kyoto Protocol target), and, secondly, beyond this date. Projections for France show that national emissions could be 10% higher than the Kyoto target in 2010 if no measures are taken. This is particularly due to increasing emissions in the sectors affecting daily life (residential-tertiary sectors, transport, etc.). For this reason, the Climate Plan contains measures affecting all sectors of the economy and the daily life of all French citizens with a view to economizing the equivalent of 54 million tonnes of CO 2 each year by the year 2010, which will help to reverse the trend significantly. Beyond 2010, the Climate Plan sets out a strategy for technological research which will enable France to meet a target of reducing greenhouse gas emissions four or fivefold by 2050. (author)

  12. Disability Compensation and Patient Expenditures: FY2000 to FY2013

    Data.gov (United States)

    Department of Veterans Affairs — This report contains FY2000 through FY2013 data on disability compensation expenditures and recipients and on VA healthcare system patients and patient expenditures.

  13. Long-Range Research Plan, FY 1985-FY 1989

    International Nuclear Information System (INIS)

    1984-09-01

    The Long-Range Research Plan (LRRP) was prepared by the Office of Nuclear Regulatory Research (RES) to assist the NRC in coordinating its long-range research planning with the short-range budget cycles. The LRRP lays out programmatic approaches for research to help resolve regulatory issues. The plan will be updated annually. This document is divided into the following sections: operating reactor inspection, maintenance, and repair; equipment qualification; seismic research; reactor operations and risk; thermal-hydraulic transients; severe accidents; advanced concepts; radiation protection and health effects; and waste management. The following are also listed as appendices: unresolved safety issues and TMI action plan items, priorities for research program, research program outline, and research utilization report. A glossary of acronyms is included

  14. The socioeconomic impacts of the 2004-2008 drought in the Ebro river basin (Spain): A comprehensive and critical assessment

    Science.gov (United States)

    Hernández-Mora, N.; Garrido, A.; Gil, M.

    2012-04-01

    Water scarcity and drought are particularly relevant phenomena in Spain, a country with a Mediterranean climate and intense pressure on existing water resources. Spain's drought management policies have evolved significantly over time, and today Spain is at the forefront of drought management and mitigation planning in Europe. However, drought management policies are not informed by comprehensive or accurate estimations of the socioeconomic impacts of drought, nor by the efficiency or efficacy of drought management and mitigation measures. Previous studies attempting to estimate on the impacts of drought are based on direct economic users of water, primarily irrigated agriculture and hydropower. Existing analyses do not take into consideration the impacts on other economic sectors, such as recreational uses, which have a growing importance from a socioeconomic perspective. Additionally, the intangible or non-market impacts (on social welfare and wellbeing and on the environment) are not considered or measured, although they can be significant. This paper presents the mid-point results of the PREEMPT project (Policy relevant assessment of the socioeconomic effects of droughts and floods, ECHO - grant agreement # 070401/2010/579119/SUB/C4), an effort to provide a comprehensive assessment of the socioeconomic impacts of the 2004-2008 drought in the Ebro river basin. The study gathers existing information on direct and indirect economic impacts of drought on different sectors, completing existing gaps and comparing the results of studies that use different methodologies. It also estimates the welfare losses resulting from domestic water use restrictions and environmental degradation as a result of the drought using a value transfer approach from results derived from value choice experiments developed for other Spanish and international river basins. Results indicate that there is a clear need to improve our knowledge of the direct and indirect impacts of drought and to

  15. CIEMAT participation in the VI National Plan of Scientific Research, Development and Technological Innovation 2008-2012; Participacion del CIEMAT en el VI Plan Nacional de Investigacion Cientifica, Desarrollo e Innovacion Tecnologica 2008-2012

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez, M. T.; Puertas, M. I.

    2014-02-01

    The participation of CIEMAT in the VI National Plan for Scientific Research, Development and Technological Innovation 2008-2011, that was extended by decision of the Council of Ministers until December 2012, is presented. In the first part of the report presents a complete information about the structure of the Plan, the various Instrumental Lines of Action and subsequent calls for National Programs, that have taken place throughout the development of the Plan since its beginning in 2008 until its closure gives in December 2012. The second part of the report includes the description and analysis of the participation of CIEMAT in the calls of the various National Programs, and the contribution of each of the Departments in the number of projects awarded and the funding obtained. The Total number of funded projects was 292, which meant funding amounting to 101, 5 M Euros. (Author)

  16. Public affairs plan

    International Nuclear Information System (INIS)

    1995-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies

  17. Terrorism and emergency preparedness in state and territorial public health departments--United States, 2004.

    Science.gov (United States)

    2005-05-13

    After the events of September 11, 2001, federal funding for state public health preparedness programs increased from $67 million in fiscal year (FY) 2001 to approximately $1 billion in FY 2002. These funds were intended to support preparedness for and response to terrorism, infectious disease outbreaks, and other public health threats and emergencies. The Council of State and Territorial Epidemiologists (CSTE) assessed the impact of funding on epidemiologic capacity, including terrorism preparedness and response, in state health departments in November 2001 and again in May 2004, after distribution of an additional $1 billion in FY 2003. This report describes the results of those assessments, which indicated that increased funding for terrorism preparedness and emergency response has rapidly increased the number of epidemiologists and increased capacity for preparedness at the state level. However, despite the increase in epidemiologists, state public health officials estimate that 192 additional epidemiologists, an increase of 45.3%, are needed nationwide to fully staff terrorism preparedness programs.

  18. Active Sites Environmental Monitoring Program. FY 1993: Annual report

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Ashwood, T.L.; Hicks, D.S.; Marsh, J.D.

    1994-08-01

    This report continues a series of annual and semiannual reports that present the results of the Active Sites Environmental Monitoring Program (ASEMP) monitoring activities. The report details monitoring data for fiscal year (FY) 1993 and is divided into three major areas: SWSA 6 [including tumulus pads, Interim Waste Management Facility (IWMF), and other sites], the low-level Liquid-Waste Solidification Project (LWSP), and TRU-waste storage facilities in SWSA 5 N. The detailed monitoring methodology is described in the second revision of the ASEMP program plan. This report also presents a summary of the methodology used to gather data for each major area along with the results obtained during FY 1993

  19. Summary of BISON Development Activities: NEAMS FY14 Report

    Energy Technology Data Exchange (ETDEWEB)

    Williamson, R. L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Novascone, S. R. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hales, J. D. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Spencer, B. W. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Liu, W. [Anatech, Inc.; Pastore, G. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Perez, D. M. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gardner, R. J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Stafford, D. S. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gamble, K. A. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-10-01

    This summary report contains an overview of work performed under the work package entitled “FY2014 NEAMS INL-Engineering Scale Fuel Performance & Interface with RPL Tools.” A first chapter identifies the specific FY-14 milestones, providing a basic description of the associated work and references to related detailed documentation. Where applicable, a representative technical result is provided. A second chapter summarizes substantial additional work including 1) efforts to improve numerical convergence and contact in BISON, 2) development of capability to simulate hydrogen behavior in Zircaloy cladding and 3) efforts to enhance collaborative work with the Halden Research Program. A final chapter briefly outlines planned future work.

  20. Institutional Plan, FY1989--FY1994

    International Nuclear Information System (INIS)

    1988-12-01

    This report discusses future plans of the Stanford Linear Accelerator Center. Topics covered are: Laboratory Mission; Special Issues; Laboratory Strategic View; Scientific Program at SLAC; Initiatives; Education and Technology Transfer Programs; Site and Facilities; and Resource Projections. 9 tabs

  1. NITRD Program Supplement to the President`s Budget - FY 2017

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — This document is a supplement to the President`s 2017 Budget Request to Congress. It describes the activities planned for FY2017 by the Federal agencies...

  2. NITRD Program Supplement to the President`s Budget - FY 2018

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — This document is a supplement to the President`s 2018 Budget Request to Congress. It describes the activities planned for FY2018 by the Federal agencies...

  3. Learning from research on the information behaviour of healthcare professionals: a review of the literature 2004-2008 with a focus on emotion.

    Science.gov (United States)

    Fourie, Ina

    2009-09-01

    A review, focusing on emotion, was conducted of reported studies on the information behaviour of healthcare professionals (2004-2008). Findings were intended to offer guidelines on information services and information literacy training, to note gaps in research and to raise research interest. Databases were searched for literature published from January 2004 to December 2008 and indexed on eric, Library and Information Science Abstracts, medline, PsycINFO, Social Services Abstracts, Sociological Abstracts, Health Source: Nursing/Academic Edition; Library, Information Science & Technology Abstracts; Psychology and Behavioral Sciences Collection; Social Work Abstracts; SocINDEX with Full Text; SPORTDiscus; cinhal; and the ISI Web of Knowledge databases. Key journals were manually scanned and citations followed. Literature was included if reporting on issues concerning emotion. Emotion in information behaviour in healthcare contexts is scantily addressed. This review, however, offers some insight into the difficulty in identifying and expressing information needs; sense making and the need to fill knowledge gaps; uncertainty; personality and coping skills; motivation to seeking information; emotional experiences during information seeking; self-confidence and attitude; emotional factors in the selection of information channels; and seeking information for psychological or emotional reasons. Suggestions following findings, address information literacy programs, information services and research gaps.

  4. Argonne National Laboratory institutional plan FY 2001--FY 2006.

    Energy Technology Data Exchange (ETDEWEB)

    Beggs, S.D.

    2000-12-07

    This Institutional Plan describes what Argonne management regards as the optimal future development of Laboratory activities. The document outlines the development of both research programs and support operations in the context of the nation's R and D priorities, the missions of the Department of Energy (DOE) and Argonne, and expected resource constraints. The Draft Institutional Plan is the product of many discussions between DOE and Argonne program managers, and it also reflects programmatic priorities developed during Argonne's summer strategic planning process. That process serves additionally to identify new areas of strategic value to DOE and Argonne, to which Laboratory Directed Research and Development funds may be applied. The Draft Plan is provided to the Department before Argonne's On-Site Review. Issuance of the final Institutional Plan in the fall, after further comment and discussion, marks the culmination of the Laboratory's annual planning cycle. Chapter II of this Institutional Plan describes Argonne's missions and roles within the DOE laboratory system, its underlying core competencies in science and technology, and six broad planning objectives whose achievement is considered critical to the future of the Laboratory. Chapter III presents the Laboratory's ''Science and Technology Strategic Plan,'' which summarizes key features of the external environment, presents Argonne's vision, and describes how Argonne's strategic goals and objectives support DOE's four business lines. The balance of Chapter III comprises strategic plans for 23 areas of science and technology at Argonne, grouped according to the four DOE business lines. The Laboratory's 14 major initiatives, presented in Chapter IV, propose important advances in key areas of fundamental science and technology development. The ''Operations and Infrastructure Strategic Plan'' in Chapter V includes

  5. Present status of refining and conversion facility dismantling. Progress in latter half of 2010FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2011-09-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) will be dismantled by the 2011 fiscal year, and ventilating equipment and liquid waste treatment equipment will be dismantled by the 2014 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  6. 76 FR 61402 - Draft Nuclear Regulatory Commission Fiscal Year 2012-2016 Strategic Plan

    Science.gov (United States)

    2011-10-04

    ...-2016 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; request for comment... comment on draft NUREG-1614, Volume 5. ``U.S. Nuclear Regulatory Commission, FY 2012-2016 Strategic Plan,'' dated September 2011. The NRC's draft FY 2012-2016 strategic plan describes the agency's mission and...

  7. Hospitalizations for varicella in children and adolescents in a referral hospital in Hong Kong, 2004 to 2008: A time series study

    Directory of Open Access Journals (Sweden)

    Chan WM

    2011-05-01

    Full Text Available Abstract Background Varicella accounts for significant morbidities and remains a public health issue worldwide. Climatic factors have been shown to associate with the incidence and transmission of various infectious diseases. We describe the epidemiology of varicella in paediatric patients hospitalized at a tertiary referral hospital in Hong Kong from 2004 to 2008, and to explore the possible association between the occurrence of varicella infection and various climatic factors. Methods The hospital discharge database of Princess Margaret Hospital was retrospectively analyzed for admissions associated with varicella from 2004 to 2008. Meteorological data were obtained from the monthly meteorological reports from the Hong Kong Observatory website. Time series analysis was performed with Poisson regression using a Generalized Estimating Equation (GEE approach. Results During the study period, 598 children were hospitalized for varicella. The mean age on admission was 57.6 months, and the mean duration of hospitalization was 3.7 days. The overall complication rate was 47%. The mean monthly relative humidity, especially in cool seasons, was inversely correlated with the monthly varicella cases of the same month. Conclusions Varicella can lead to serious complications and prolonged hospitalization, even in previously healthy children. Lower relative humidity in cool seasons is associated with higher number of paediatric varicella hospital admissions. These findings are useful for a better understanding of the pattern of paediatric varicella hospitalization in Hong Kong.

  8. 77 FR 8219 - Notice of Indirect Cost Rates for the Office of National Marine Sanctuaries for Fiscal Years 2008...

    Science.gov (United States)

    2012-02-14

    ... requirements. C&C also determined that the most appropriate indirect allocation method was the Direct Labor... most appropriate indirect allocation method for the development of the FY 2008 and 2009 indirect cost... October 1, 2008 and present, using the Direct Labor Cost base allocation methodology. For cases that have...

  9. NREL photovoltaic program FY 1997 annual report

    Energy Technology Data Exchange (ETDEWEB)

    McConnell, R.D.; Hansen, A.; Smoller, S.

    1998-06-01

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) going to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.

  10. 401(k) plan asset allocation, account balances, and loan activity in 2008.

    Science.gov (United States)

    VanDerhei, Jack; Holden, Sarah; Alonso, Luis

    2009-10-01

    Because 401(k) balances can fluctuate with market returns from year to year, meaningful analysis of 401(k) plans must examine how participants' accounts have performed over the long term. Looking at consistent participants in the EBRI/ICI 401(k) database over the five-year period from 2003 to 2008 (which included one of the worst bear markets for stocks since the Great Depression), the study found: After rising in 2003 and for the next four consecutive years, the average 401(k) retirement account fell 24.3 percent in 2008. The average 401(k) account balance moved up and down with stock market performance, but over the entire five-year time period increased at an average annual growth rate of 7.2 percent, attaining $86,513 at year-end 2008. The median (mid-point) 401(k) account balance increased at an average annual growth rate of 11.4 percent over the 2003-2008 period to $43,700 at year-end 2008. THE BULK OF 401(K) ASSETS CONTINUED TO BE INVESTED IN STOCKS. On average, at year-end 2008, 56 percent of 401(k) participants' assets were invested in equity securities through equity funds, the equity portion of balanced funds, and company stock. Forty-one percent was in fixed-income securities such as stable-value investments and bond and money market funds. THREE-QUARTERS OF 401(K) PLANS INCLUDED LIFECYCLE FUNDS IN THEIR INVESTMENT LINEUP AT YEAR-END 2008. At year-end 2008, nearly 7 percent of the assets in the EBRI/ICI 401(k) database were invested in lifecycle funds and 31 percent of 401(k) participants held lifecycle funds. Also known as "target-date" funds, they are designed to simplify investing and automate account rebalancing. NEW EMPLOYEES CONTINUED TO USE BALANCED FUNDS, INCLUDING LIFECYCLE FUNDS. Across all age groups, more new or recent hires invested their 401(k) assets in balanced funds, including lifecycle funds. At year-end 2008, 36 percent of the account balances of recently hired participants in their 20s were invested in balanced funds, compared with

  11. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  12. Gefinex 400S (Sampo) EM-soundings at Olkiluoto 2008

    International Nuclear Information System (INIS)

    Jokinen, T.; Lehtimaeki, J.

    2008-09-01

    In the beginning of June 2008 Geological Survey of Finland (GTK) carried out electromagnetic frequency soundings with Gefinex 400S equipment (Sampo) in the vicinity of ONKALO at the Olkiluoto site investigation area. The same soundings sites were first time measured and marked in 2004 and has been repeated after it yearly in the same season. The aim of the measurements is to monitor the changes of groundwater conditions by the changes of the electric conductivity of the earth at ONKALO and repository area. The measurements form two 1400 m long broadside profiles, which have 200 m mutual distance and 200 m station separation. The profiles have been measured using 200, 500, and 800 m coil separations. Because of the strong electromagnetic noise all planned sites (48) could not be measured. In 2008 the measurements were performed at the sites that were successful in 2007 (43 soundings). The numerous power lines and cables in the area generate local disturbances on the sounding curves, but the signal/noise also with long coil separations and the repeatability of the results is reasonably good. However, most suitable for monitoring purposes are the sites without strong surficial 3D effects. Comparison of the results of 2004 to 2008 surveys shows differences on some ARD (Apparent resistivity-depth) curves. Those are mainly results of the modified man-made structures. The effects of changes in groundwater conditions are obviously slight. (orig.)

  13. The Sandia MEMS passive shock sensor : FY08 design summary.

    Energy Technology Data Exchange (ETDEWEB)

    Walraven, Jeremy Allen; Baker, Michael Sean; Clemens, Rebecca C.; Mitchell, John Anthony; Brake, Matthew Robert; Epp, David S.; Wittwer, Jonathan W.

    2008-11-01

    This report summarizes design and modeling activities for the MEMS passive shock sensor. It provides a description of past design revisions, including the purposes and major differences between design revisions but with a focus on Revisions 4 through 7 and the work performed in fiscal year 2008 (FY08). This report is a reference for comparing different designs; it summarizes design parameters and analysis results, and identifies test structures. It also highlights some of the changes and or additions to models previously documented [Mitchell et al. 2006, Mitchell et al. 2008] such as the way uncertainty thresholds are analyzed and reported. It also includes dynamic simulation results used to investigate how positioning of hard stops may reduce vibration sensitivity.

  14. Richland Operations (DOE-RL) Environmental Safety Health (ES and H) FY 2000 and FY 2001 Execution Commitment Summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    2000-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the Safety and Health (S&H) resources that support these activities. The fiscal year (FY) 2000 and 2001 information and data contained in the Richland Operations Environment, Safefy and Health Fiscal Year 2002 Budget-Risk Management Summary (RL 2000a) were the basis for preparing this report. Fiscal year 2001 activities are based on the President's Amended Congressional Budget Request of $689.6 million for funding Ofice of Environmental Management (EM) $44.0 million for Fast Flux Test Facility standby less $7.0 million in anticipated DOE, Headquarters holdbacks for Office of Nuclear Energy, Science and Technology (NE); and $55.3 million for Safeguards and Security (SAS). Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2003 ES&H Budget-Risk Management Summary to be issued in May 2001. This report provides the end-of-year status of FY 2000 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2001 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H guidance contained in the FY 2002 Field Budget Call (DOE 2000).

  15. 2009 DOE Vehicle Technologies Program Annual Merit Review

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2009-10-01

    Annual Merit Review and Peer Evaluation Meeting to review the FY2008 accomplishments and FY2009 plans for the Vehicle Technologies Program, and provide an opportunity for industry, government, and academic to give inputs to DOE on the Program with a structured and formal methodology.

  16. National Nanotechnology Initiative. Research and Development Supporting the Next Industrial Revolution. Supplement to the President’s 2004 Budget

    Science.gov (United States)

    2004-01-01

    and Development Supporting the Next Industrial Revolution Supplement to the President’s FY 2004 Budget National Science and Technology Council...potential to profoundly change our economy, to improve our standard of living, and to bring about the next industrial revolution . Nanotechnology: From

  17. Alternative Electrochemical Salt Waste Forms, Summary of FY11-FY12 Results

    Energy Technology Data Exchange (ETDEWEB)

    Riley, Brian J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mccloy, John S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Crum, Jarrod V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lepry, William C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rodriguez, Carmen P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Windisch, Charles F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Matyas, Josef [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Westman, Matthew P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rieck, Bennett T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lang, Jesse B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Olszta, Matthew J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pierce, David A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-01-17

    The Fuel Cycle Research and Development Program, sponsored by the U.S. Department of Energy Office of Nuclear Energy, is currently investigating alternative waste forms for wastes generated from nuclear fuel processing. One such waste results from an electrochemical separations process, called the “Echem” process. The Echem process utilizes a molten KCl-LiCl salt to dissolve the fuel. This process results in a spent salt containing alkali, alkaline earth, lanthanide halides and small quantities of actinide halides, where the primary halide is chloride with a minor iodide fraction. Pacific Northwest National Laboratory (PNNL) is concurrently investigating two candidate waste forms for the Echem spent-salt: high-halide minerals (i.e., sodalite and cancrinite) and tellurite (TeO2)-based glasses. Both of these candidates showed promise in fiscal year (FY) 2009 and FY2010 with a simplified nonradioactive simulant of the Echem waste. Further testing was performed on these waste forms in FY2011 and FY2012 to assess the possibility of their use in a sustainable fuel cycle. This report summarizes the combined results from FY2011 and FY2012 efforts.

  18. US Nuclear Regulatory Commission Human Factors Program Plan. Revision 1

    International Nuclear Information System (INIS)

    1984-09-01

    The purpose of the NRC Human Factors Program Plan (NUREG-0985) is to ensure that proper consideration is given to human factors in the design, operation, and maintenance of nuclear facilities. This revised plan addresses nuclear power plants (NPPs) and describes (1) the technical assistance and research activities planned to provide the technical bases for the resolution of the remaining human factors related tasks described in NUREG-0660, THE NRC Action Plan developed as a result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the additional human factors efforts identified during implementation of the Action Plan that should receive NRC attention; (3) conduct of developmental activities specified in NUREG-0985 during FY-83; and (4) the impact of Section 306 of the Nuclear Waste Policy Act of 1982, PL 97-425. The plan represents a systematic and comprehensive approach for addressing human factors concerns important to NPP safety in the FY-84 through FY-86 time frame

  19. Decontamination and decommissioning activities photobriefing book FY 1998

    International Nuclear Information System (INIS)

    1999-01-01

    Fiscal Year (FY) 1998 was very successful in terms of Decontamination and Decommissioning (D and D) project completions. This photobriefing book highlights these projects and activities in one ongoing project. Brief descriptions of projects planned for the future are also provided. Two D and D projects funded by the US DOE Office of Environmental Management (EM-40) were completed safely and on schedule in FY 1998: (1) Argonne Thermal Source Reactor (ATSR) was a low-power research reactor that operated from 1950 to 1989; and (2) The Building 594 (a.k.a. 579) Waste Ion-Exchange Facility was an obsolete facility constructed in the 1950s to process waste fluids from a collecting lagoon. Field work at one project was ongoing during FY 1998: (1) Chicago Pile 5 (CP-5) was a 5-megawatt, heavy water-moderated, enriched uranium-fueled reactor used to produce neutrons for scientific research from 1954-79. The reactor was shut down and defueled in 1979. D and D is scheduled to be completed in FY 2000. Project experience has lent itself to developing unique staff capabilities. The D and D group was chosen as lead organization for a project supported with operating funds provided by Argonne's Plant Facilities and Services (PFS) Division. This project was also completed safely and on schedule in FY 1998: (1) The Building 200/205 Pneumatic Transfer Tube was constructed in the late 1960s between Hot Cell M-4 in Building 200 and a glove box in Room F-131, Building 205, and used to transfer irradiated fuel specimens and other samples between the two buildings

  20. Tanks Focus Area Site Needs Assessment - FY 2001

    Energy Technology Data Exchange (ETDEWEB)

    Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.; Nickola, Cheryl L.

    2001-04-30

    The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, from collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.

  1. Supporting Data Amended FY 1992/FY 1993 Biennial Budget Estimate Submitted to Congress - January 1992. Descriptive Summaries of the Research, Development, Test and Evaluation, Army Appropriation

    Science.gov (United States)

    1992-01-01

    dessert and snack items to increase acceptability and 31$,) UNCLASSIFIED UNCLASSIFIED AMENDED FY 1992/1993 BIENNIAL RDTE DESCRIPTIVE SUMMARY Program...Planned Program: " (U) Finalize development of non-organic and non-polluting processing bids for extruded and molded energetic materials * (U

  2. Areva group. Result, first half 2004; Resultats du 1. semestre 2004. Groupe Areva

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-09-01

    Areva, a world nuclear industry leader, provides by this document information and key data on the performance and detailed financial data of the first half 2004. The transmission and distribution integration plan 2004-2006 is also detailed. (A.L.B.)

  3. 75 FR 44265 - Office of the Assistant Secretary for Planning and Evaluation; Request for Comments on the...

    Science.gov (United States)

    2010-07-28

    ... planning process is an opportunity for the Department to further refine and strengthen the strategic goal... for Planning and Evaluation; Request for Comments on the Departmental FY 2010-2015 Strategic Plan... and Human Services Draft FY 2010-2015 Strategic Plan is provided as part of the strategic planning...

  4. EMSL Quarterly Highlights Report: FY 2008, 3rd Quarter

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann

    2008-09-16

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

  5. The eastern Baltic cod fishery: a fleet-based management strategy evaluation framework to assess the cod recovery plan of 2008

    DEFF Research Database (Denmark)

    Bastardie, Francois; Nielsen, J. Rasmus; Kraus, Gerd

    2010-01-01

    The eastern Baltic cod fishery: a fleet-based management strategy evaluation framework to assess the cod recovery plan of 2008. - ICES Journal of Marine Science, 67: 71-86.......The eastern Baltic cod fishery: a fleet-based management strategy evaluation framework to assess the cod recovery plan of 2008. - ICES Journal of Marine Science, 67: 71-86....

  6. Assessing Challenges and Opportunities for Education and Communication Activities for International Polar Year 2007-2008

    Science.gov (United States)

    McCaffrey, M. S.

    2005-05-01

    Considerable planning has gone into identifying ways to maximize International Polar Year 2007-2008 (IPY) as a global event that will facilitate the integration of research and education inherent in IPY, and draw the interest and involvement of people around the world. Documents developed through the IPY planning process, including NRC Reports (2004), and drafts reports on education and outreach from the ICSU IPY Planning Group in the Fall of 2004, and the Bridging the Poles workshop of June, 2004, articulate the tremendous potential for IPY beyond the formal research agenda and goals. With less that two years before the start of IPY and fewer than fours years before the activities are completed, these and emerging opportunities face a number of challenges. In addition to the limited time frame remaining to prepare for these activities, participants involved with IPY education and outreach will also need to consider factors such as: uncertain funding for such activities; the lack of established international networks for geoscience education; the need for high level coordination of IPY education and communication; and the creative and intellectual challenge of making the polar regions relevant to people around the world. The planning process has identified six constituencies as key audiences of IPY communication efforts: i) the scientific/research community, ii) young and potentially new polar researchers, iii) the pre-university education community, iv) arctic communities, iv) the general public, and v) decision-makers. Understanding and meeting these audiences' expectations through on-going evaluation and engagement will be key to successful IPY education and outreach efforts. A number of distinct education and outreach projects have been proposed to the ICSU-WMO IPY planning process, such as courses and workshops on specific aspects of IPY, including efforts to address the social and cultural dimension of Arctic peoples. To help meet the challenges, achieve the

  7. Hanford environmental management program multi-year work plan FY1998

    International Nuclear Information System (INIS)

    Giese, K.A.

    1997-01-01

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year's work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ''Work Authorization'' identifies the impacted scope and requires the Contracting Officer's or Assistant Manager-Contracting Officer's Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ''Project Summary Section'' and Section Two is titled the ''Additional Sections at the Project Baseline Summaries Level''. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS number-sign RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  8. 75 FR 74517 - Approval and Promulgation of Implementation Plans; State of California; 2008 San Joaquin Valley...

    Science.gov (United States)

    2010-11-30

    ... formed in the atmosphere as a result of various chemical reactions from precursor emissions of nitrogen... air quality modeling, the reasonable further progress (RFP) demonstration, the contingency measures... Modeling in the SJV 2008 PM 2.5 Plan 3. PM 2.5 Attainment Plan Precursors 4. Extension of the Attainment...

  9. Operation databook of the fuel treatment system of the Static Experiment Critical Facility (STACY) and the Transient Experiment Critical Facility (TRACY). JFY 2004 to JFY 2008

    International Nuclear Information System (INIS)

    Kokusen, Junya; Sumiya, Masato; Seki, Masakazu; Kobayashi, Fuyumi; Ishii, Junichi; Umeda, Miki

    2013-02-01

    Uranyl nitrate solution fuel used in the Static Experiment Critical Facility (STACY) and the Transient Experiment Critical Facility (TRACY) is adjusted in the Fuel Treatment System, in which such parameters are varied as concentration of uranium, free nitric acid, soluble neutron poison, and so on. Operations for concentration and denitration of the solution fuel were carried out with an evaporator from JFY 2004 to JFY 2008 in order to adjust the fuel to the experimental condition of the STACY and the TRACY. In parallel, the solution fuel in which some kinds of soluble neutron poison were doped was also adjusted in JFY 2005 and JFY 2006 for the purpose of the STACY experiments to determine neutron absorption effects brought by fission products, etc. After these experiments in the STACY, a part of the solution fuel including the soluble neutron poison was purified by the solvent extraction method with mixer-settlers in JFY 2006 and JFY 2007. This report summarizes operation data of the Fuel Treatment System from JFY 2004 to JFY 2008. (author)

  10. Exploratory Research and Development Fund, FY 1990

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicine and radiation biophysics.

  11. Deficiencies in FY 1998 DOD Financial Statements and Progress Toward Improved Financial Reporting

    National Research Council Canada - National Science Library

    Lane, F

    1999-01-01

    The audit objectives were to identify and summarize the major deficiencies that prevented favorable audit opinions on the FY 1998 DoD financial statements and to identify the actions taken or planned...

  12. Bibliography of Unclassified Reports: FY 1983.

    Science.gov (United States)

    1983-11-01

    selected automobile and motorcyclemagazines with a high proportion of readership in this age group. The strategy was evaluated by comparing the number of...climate of the human resource management ( HRM ) survey in compliance with the FY82 Navy Affirmative Action Plan. The most recent 1-year data base (I July...1980 to 30 June 1981) of HRM survey responses was used, yielding a sample of 35,690 personnel. The responses of whites and blacks, whites and

  13. Test plan for engineering scale electrostatic enclosure demonstration

    International Nuclear Information System (INIS)

    Meyer, L.C.

    1993-02-01

    This test plan describes experimental details of an engineering-scale electrostatic enclosure demonstration to be performed at the Idaho National Engineering Laboratory in fiscal year (FY)-93. This demonstration will investigate, in the engineering scale, the feasibility of using electrostatic enclosures and devices to control the spread of contaminants during transuranic waste handling operations. Test objectives, detailed experimental procedures, and data quality objectives necessary to perform the FY-93 experiments are included in this plan

  14. FTA multi-year research program plan (FY 2009 - FY 2013).

    Science.gov (United States)

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  15. Integrated Task Plans for the Hanford Environmental Dose Reconstruction Project, FY 1992 through May 1994

    International Nuclear Information System (INIS)

    Shipler, D.B.

    1992-09-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The primary objective of work to be performed through May 1994 is to (1) determine the project's appropriate scope (space, time, radionuclides, pathways and individuals/population groups), (2) determine the project's appropriate level of accuracy (level of uncertainty in dose estimates) for the project, (3) complete model and data development, and (4) estimate doses for the Hanford Thyroid Disease Study (HTDS), representative individuals, and special populations as described herein. The plan for FY 1992 through May 1994 has been prepared based on activities and budgets approved by the Technical Steering Panel (TSP) at its meetings on August 19--20, 1991, and April 23--25, 1992. The activities can be divided into four broad categories: (1) model and data evaluation activities, (2)additional dose estimates, (3) model and data development activities, and (4)technical and communication support

  16. Multi-Year Program Plan 2011-2015

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-12-01

    The Vehicle Technologies Multi-Year Program Plan, FY 2011 – 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration's goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  17. 2008 AESON JOURNAL

    African Journals Online (AJOL)

    OLUWOLE AKINNAGBE

    However, research reports and official documents show that poor people in. Nigeria tend to be concentrated in communities that lack the benefits of modern development. Rural areas and urban fringes have a slightly higher concentration of poor people (Ayanwale and Alimi 2004). Generally, available estimates (CIA 2008, ...

  18. Institutional plan. FY 1998--2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This Institutional Plan for Argonne National Laboratory contains central elements of Argonne`s strategic plan. Chapter II of this document discusses the Laboratory`s mission and core competencies. Chapter III presents the Science and Technology Strategic Plan, which summarizes key features of the external environment, presents Argonne`s vision, and describes how the Laboratory`s strategic goals and objectives map onto and support DOE`s four business lines. The balance of the chapter comprises the science and technology area plans, organized by the four DOE business lines. Chapter IV describes the Laboratory`s ten major initiatives, which cover a broad spectrum of science and technology. Our proposal for an Exotic Beam Facility aims at, among other things, increased understanding of the processes of nuclear synthesis during and shortly after the Big Bang. Our Advanced Transportation Technology initiative involves working with US industry to develop cost-effective technologies to improve the fuel efficiency and reduce the emissions of transportation systems. The Laboratory`s plans for the future depend significantly on the success of its major initiatives. Chapter V presents our Operations and Infrastructure Strategic Plan. The main body of the chapter comprises strategic plans for human resources; environmental protection, safety, and health; site and facilities; and information management. The chapter concludes with a discussion of the business and management practices that Argonne is adopting to improve the quality and cost-effectiveness of its operations. The structure and content of this document depart from those of the Institutional Plan in previous years. Emphasis here is on directions for the future; coverage of ongoing activities is less detailed. We hope that this streamlined plan is more direct and accessible.

  19. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoverson, Eric D.; Amonette, Alexandra

    2009-02-09

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of

  20. Laboratory Directed Research and Development Program Activities for FY 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Looney,J.P.; Fox, K.

    2009-04-01

    Brookhaven National Laboratory (BNL) is a multidisciplinary laboratory that maintains a primary mission focus the physical sciences, energy sciences, and life sciences, with additional expertise in environmental sciences, energy technologies, and national security. It is managed by Brookhaven Science Associates, LLC, (BSA) under contract with the U. S. Department of Energy (DOE). BNL's Fiscal year 2008 budget was $531.6 million. There are about 2,800 employees, and another 4,300 guest scientists and students who come each year to use the Laboratory's facilities and work with the staff. The BNL Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) annually in March, as required by DOE Order 413.2B, 'Laboratory Directed Research and Development,' April 19, 2006, and the Roles, Responsibilities, and Guidelines for Laboratory Directed Research and Developlnent at the Department of Energy/National Nuclear Security Administration Laboratories dated June 13, 2006. Accordingly, this is our Annual Report in which we describe the Purpose, Approach, Technical Progress and Results, and Specific Accomplishments of all LDRD projects that received funding during Fiscal Year 2008. BNL expended $12 million during Fiscal Year 2008 in support of 69 projects. The program has two categories, the annual Open Call LDRDs and Strategic LDRDs, which combine to meet the overall objectives of the LDRD Program. Proposals are solicited annually for review and approval concurrent with the next fiscal year, October 1. For the open call for proposals, an LDRD Selection Committee, comprised of the Associate Laboratory Directors (ALDs) for the Scientific Directorates, an equal number of scientists recommended by the Brookhaven Council, plus the Assistant Laboratory Director for Policy and Strategic Planning, review the proposals submitted in response to the solicitation. The Open Can LDRD category emphasizes innovative research concepts

  1. FY 1991--FY 1995 Information Technology Resources Long-Range Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The Department of Energy has consolidated its plans for Information Systems, Computing Resources, and Telecommunications into a single document, the Information Technology Resources Long-Range Plan. The consolidation was done as a joint effort by the Office of ADP Management and the Office of Computer Services and Telecommunications Management under the Deputy Assistant Secretary for Administration, Information, and Facilities Management. This Plan is the product of a long-range planning process used to project both future information technology requirements and the resources necessary to meet those requirements. It encompasses the plans of the various organizational components within the Department and its management and operating contractors over the next 5 fiscal years, 1991 through 1995.

  2. Meteorological factors and pollen season dynamics of selected herbaceous plants in Szczecin, 2004-2008

    Directory of Open Access Journals (Sweden)

    Małgorzata Puc

    2012-12-01

    Full Text Available The pollen of mugwort, plantain, sorrel, nettle and pigweed is an important airborne allergen source worldwide. The occurrence of pollen grains in the air is a seasonal phenomenon and estimation of seasonal variability in the pollen count permits evaluation of the threat posed by allergens over a given area. The aim of the study was to analyse the dynamics of Artemisia, Plantago, Rumex, Urticaceae and Chenopodiaceae pollen season in Szczecin (western Poland in 2004-2008 and to establish a relationship between the meteorological parameters versus the pollen count of the taxa studied. Measurements were performed by the Hirst volumetric trap (model Lanzoni VPPS 2000. Consecutive phases during the pollen season were defined for each taxon (1, 5, 25, 50, 75, 95, 99% of annual total and duration of the season was determined using the 98% method. On the basis of this analysis, temporary differences in the dynamics of the seasons were most evident for Artemisia. Correlation analysis with weather parameters demonstrated that the maximum wind speed, mean and maximum air temperature, relative humidity and dew point are the main factors influencing the average daily pollen concentrations in the atmosphere.

  3. Scanning Mechanism of the FY-3 Microwave Humidity Sounder

    Science.gov (United States)

    Schmid, Manfred; Jing, Li; Hehr, Christian

    2010-01-01

    Astrium GmbH Germany, developed the scanning equipment for the instrument package of the MicroWave Humidity Sounder (MWHS) flying on the FY-3 meteorological satellite (FY means Feng Yun, Wind and Cloud) in a sun-synchronized orbit of 850-km altitude and at an inclination of 98.8 . The scanning mechanism rotates at variable velocity comprising several acceleration / deceleration phases during each revolution. The Scanning Mechanism contains two output shafts, each rotating a parabolic offset Antenna Reflector. The mechanism is operated in closed loop by means of redundant control electronics. MWHS is a sounding radiometer for measurement of global atmospheric water vapour profiles. An Engineering Qualification Model was developed and qualified and a first Flight Model was launched early 2008. The system is now working for more than two years successful in orbit. A second Flight Model of the Antenna Scanning Mechanism and of its associated control electronics was built and delivered to the customer for application on the follow-on spacecraft that will be launched by the end of 2010.

  4. Years of life lost because of premature death due to intentional and unintentional accidents in Ghazvin province from 2004 till 2008

    Directory of Open Access Journals (Sweden)

    Nahid Jafari

    2015-01-01

    Full Text Available Background: Accidents are the second cause of death in Iran and one of the significant challenges in public health. They can affect people in all ages. In this study, we try to calculate years of life lost due to intentional and unintentional injuries, which is considered as one of the main indicators for prioritizing public health problems.  Methods: This study is a practical cross sectional survey research HSR (health system research that uses secondary analysis on the death data of Ghazvin province. The calculations also take into account the WHO standards in age group, sex and years of life lost (YLL due to death.  Results: This study showed that the unintentional accidents were the leading cause of death based on YLL from 2004 until 2008 in Ghazvin province. The number of deaths due to intentional and unintentional accidents was 3796 deaths as of which 2954 (77.8% was male and 842 (22.2% female. In general three quarter of the YLL due to early death relates to accidents for males and less than a quarter relates to accidents for females. Between 2004 until 2008, the maximum number of years of life lost (YLL in both sexes is for the age group of 15 to 49.  Conclusion: Considering the high level of years of life lost (YLL due to accident in this province, especially in men, more appropriate interventions for the more risk prone age groups and male in general need to be taken into account.

  5. US Nuclear Regulatory Commission human-factors program plan

    International Nuclear Information System (INIS)

    1983-08-01

    The purpose of the NRC Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design, operation, and maintenance of nuclear facilities. This initial plan addresses nuclear power plants (NPP) and describes (1) the technical assistance and research activities planned to provide the technical bases for the resolution of the remaining human factors related tasks described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements, and (2) the additional human factors efforts identified during implementation of the Action Plan that should receive NRC attention. The plan represents a systematic and comprehensive approach for addressing human factors concerns important to NPP safety in the FY-83 through FY-85 time frame

  6. BC Hydro's integrated resource planning : the 2004 IEP and beyond

    International Nuclear Information System (INIS)

    Soulsby, R.

    2004-01-01

    An outline of BC Hydro Integrated Electricity Plan (IEP) was presented in this paper, along with details of its environmental, social and business performance and statistics of its net income and revenue for 2003-2004. The IEP was created to match long term load to supply in the most cost-effective way and is also the basis for resource acquisition plans. In addition, the IEP models performance of portfolios of resources on a system-wide basis, considers uncertainties through sensitivity analysis and measures and evaluates multiple attributes from various portfolios. A flow chart of processes informed by the IEP was presented. Guiding principles behind the creation of the plan include low electricity rates and public ownership; secure, reliable supply; private sector development; environmental responsibility, with no nuclear power sources; ensuring energy self-sufficiency; and maintaining a balanced portfolio of resources. A pie chart of BC Hydro's current portfolio mix was presented as well as a supply and demand outlook and details of plans and new capacity resources required before 2013. Various resource options were presented. Key outcomes of First Nations and stakeholder engagement include the acceptance of BC Hydro as a sustainable energy company; a desire for higher priority on reliability and low cost; an agreement over the Power Smart 10 year plan; a general agreement that the current, balanced approach to resource acquisition was appropriate; and a desire for more rate options. There was an assurance that BC Hydro would continue to engage First Nations and stakeholders in integrated electricity planning. Other outcomes included requests for more information about outage and outage planning and process improvements; support to maintain low rates; a preference for maximizing use of existing facilities; support for wood waste cogeneration. A broad range of options were reviewed, but no superior portfolio was identified within the parameters of this paper

  7. Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

  8. Savannah River Site's Site Specific Plan

    International Nuclear Information System (INIS)

    1991-01-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering

  9. Exploratory Research and Development Fund, FY 1990

    International Nuclear Information System (INIS)

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R ampersand D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R ampersand D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicine and radiation biophysics

  10. River Protection Project FY 2000 Multi Year Work Plan Summary

    International Nuclear Information System (INIS)

    LENSEIGNE, D.L.

    1999-01-01

    The River Protection Project (RPP), formerly the Tank Waste Remediation System (TWRS), is a major part of the U.S. Department of Energy's (DOE) Office of River Protection (ORP). The ORP was established as directed by Congress in Section 3139 of the Strom Thurmond National Defense Authorization Act for Fiscal Year (FY) 1999. The ORP was established to elevate the reporting and accountability for the RPP to the DOE-Headquarters level. This was done to gain Congressional visibility and obtain support for a major $10 billion high-level liquid waste vitrification effort

  11. Waste Minimization and Pollution Prevention Awareness Plan

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of this plan is to document Lawrence Livermore National Laboratory (LLNL) projections for present and future waste minimization and pollution prevention. The plan specifies those activities and methods that are or will be used to reduce the quantity and toxicity of wastes generated at the site. It is intended to satisfy Department of Energy (DOE) requirements. This Plan provides an overview of projected activities from FY 1994 through FY 1999. The plans are broken into site-wide and problem-specific activities. All directorates at LLNL have had an opportunity to contribute input, to estimate budget, and to review the plan. In addition to the above, this plan records LLNL's goals for pollution prevention, regulatory drivers for those activities, assumptions on which the cost estimates are based, analyses of the strengths of the projects, and the barriers to increasing pollution prevention activities

  12. Disability Insurance Applications Filed via the Internet - FY 2008-2011

    Data.gov (United States)

    Social Security Administration — This dataset provides monthly data at the national level from federal fiscal year 2008 - 2011 for initial Social Security Disability Insurance (SSDI) applications...

  13. FY 1996 solid waste integrated life-cycle forecast characteristics summary. Volumes 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Templeton, K.J.

    1996-05-23

    For the past six years, a waste volume forecast has been collected annually from onsite and offsite generators that currently ship or are planning to ship solid waste to the Westinghouse Hanford Company`s Central Waste Complex (CWC). This document provides a description of the physical waste forms, hazardous waste constituents, and radionuclides of the waste expected to be shipped to the CWC from 1996 through the remaining life cycle of the Hanford Site (assumed to extend to 2070). In previous years, forecast data has been reported for a 30-year time period; however, the life-cycle approach was adopted this year to maintain consistency with FY 1996 Multi-Year Program Plans. This document is a companion report to two previous reports: the more detailed report on waste volumes, WHC-EP-0900, FY1996 Solid Waste Integrated Life-Cycle Forecast Volume Summary and the report on expected containers, WHC-EP-0903, FY1996 Solid Waste Integrated Life-Cycle Forecast Container Summary. All three documents are based on data gathered during the FY 1995 data call and verified as of January, 1996. These documents are intended to be used in conjunction with other solid waste planning documents as references for short and long-term planning of the WHC Solid Waste Disposal Division`s treatment, storage, and disposal activities over the next several decades. This document focuses on two main characteristics: the physical waste forms and hazardous waste constituents of low-level mixed waste (LLMW) and transuranic waste (both non-mixed and mixed) (TRU(M)). The major generators for each waste category and waste characteristic are also discussed. The characteristics of low-level waste (LLW) are described in Appendix A. In addition, information on radionuclides present in the waste is provided in Appendix B. The FY 1996 forecast data indicate that about 100,900 cubic meters of LLMW and TRU(M) waste is expected to be received at the CWC over the remaining life cycle of the site. Based on

  14. FY 1996 solid waste integrated life-cycle forecast characteristics summary. Volumes 1 and 2

    International Nuclear Information System (INIS)

    Templeton, K.J.

    1996-01-01

    For the past six years, a waste volume forecast has been collected annually from onsite and offsite generators that currently ship or are planning to ship solid waste to the Westinghouse Hanford Company's Central Waste Complex (CWC). This document provides a description of the physical waste forms, hazardous waste constituents, and radionuclides of the waste expected to be shipped to the CWC from 1996 through the remaining life cycle of the Hanford Site (assumed to extend to 2070). In previous years, forecast data has been reported for a 30-year time period; however, the life-cycle approach was adopted this year to maintain consistency with FY 1996 Multi-Year Program Plans. This document is a companion report to two previous reports: the more detailed report on waste volumes, WHC-EP-0900, FY1996 Solid Waste Integrated Life-Cycle Forecast Volume Summary and the report on expected containers, WHC-EP-0903, FY1996 Solid Waste Integrated Life-Cycle Forecast Container Summary. All three documents are based on data gathered during the FY 1995 data call and verified as of January, 1996. These documents are intended to be used in conjunction with other solid waste planning documents as references for short and long-term planning of the WHC Solid Waste Disposal Division's treatment, storage, and disposal activities over the next several decades. This document focuses on two main characteristics: the physical waste forms and hazardous waste constituents of low-level mixed waste (LLMW) and transuranic waste (both non-mixed and mixed) (TRU(M)). The major generators for each waste category and waste characteristic are also discussed. The characteristics of low-level waste (LLW) are described in Appendix A. In addition, information on radionuclides present in the waste is provided in Appendix B. The FY 1996 forecast data indicate that about 100,900 cubic meters of LLMW and TRU(M) waste is expected to be received at the CWC over the remaining life cycle of the site. Based on

  15. Gestión y financiamiento de las investigaciones por el Instituto Nacional de Salud, Perú 2004-2008 Management and funding of the research by the peruvian National Institute of Health, 2004-2008

    Directory of Open Access Journals (Sweden)

    Gladys Garro

    2010-09-01

    Full Text Available Se analizó los resultados de los proyectos de investigación que han sido aprobados y financiados por el Instituto Nacional de Salud durante el periodo 2004-2008. De 182 investigaciones aprobadas y presupuestadas, se ejecutaron 150 (82%; 86% (129/150 culminaron en informe final y solo 14% (18/129 se publicaron en revistas indizadas, el promedio de tiempo de publicación de un artículo fue de 2,7 años. De las investigaciones presentadas, 68 (45%, fueron a través del fondo concursable, 60 (40% institucionales, 14 (9% de direcciones regionales de salud y 8 (5% colaborativas. El presupuesto ejecutado fue de $5 032 906,62. En promedio, se asignó a cada investigación $ 33 552,71 y el costo por cada publicación fue de $ 279 605,92; la distribución del presupuesto según objeto o tema de estudio fue 61% para enfermedades transmisibles, 12% para no transmisibles y 27% para desarrollo tecnológico. La promoción, desarrollo y financiamiento de la investigación en el Instituto Nacional de Salud durante este periodo, ha tenido una tendencia descendente, influenciada por la política institucional. Para revertir esta situación no solo a nivel institucional sino nacional, es necesario que el Estado defina su política nacional de investigación, respetando las prioridades nacionales y regionales de investigación en salud.The results of the research projects that have been approved and funded by the Instituto Nacional de Salud (Peru during the period 2004-2008 were analyzed. Out of 182 approved and funded research projects, 150 (82% were actually performed, 86% (129/150 ended in the final report and only 14% (18/129 were published in indexed journals, the mean time for publication of an article was of 2,7 years. Out of the presented research projects, 68 (45% were through a competitive fund, 60 (40% were institutional, 14 (9% coming from regional (provincial health directions and 8 (5% collaborative. The executed budget was of $ 5’032,906.62. The

  16. Oak Ridge National Laboratory institutional plan, FY 1996--FY 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years. Included in the report are: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory strategic plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; resource projections; appendix which contains data for site and facilities, user facility, science and mathematic education and human resources; and laboratory organization chart.

  17. LABORATORY DIRECTED RESEARCH AND DEVELOPMENT ANNUAL REPORT TO THE DEPARTMENT OF ENERGY - DECEMBER 2004

    Energy Technology Data Exchange (ETDEWEB)

    FOX,K.J.

    2004-12-31

    ideas, which becomes a major factor in achieving and maintaining staff excellence and a means to address national needs within the overall mission of the DOE and BNL. The LDRD Annual Report contains summaries of all research activities funded during Fiscal Year 2004. The Project Summaries with their accomplishments described in this report reflect the above. Aside from leading to new fundable or promising programs and producing especially noteworthy research, the LDRD activities have resulted in numerous publications in various professional and scientific journals and presentations at meetings and forums. All FY 2004 projects are listed and tabulated in the Project Funding Table. Also included in this Annual Report in Appendix A is a summary of the proposed projects for FY 2005. The BNL LDRD budget authority by DOE in FY 2004 was $9.5 million. The actual allocation totaled $8.5 million. The following sections in this report contain the management processes, peer review, and the portfolio's relatedness to BNL's mission, initiatives and strategic plans. Also included is a metric of success indicators and Self Assessment.

  18. Pilot chargeback system program plan

    International Nuclear Information System (INIS)

    Smith, P.

    1997-03-01

    This planning document outlines the steps necessary to develop, test, evaluate, and potentially implement a pilot chargeback system at the Idaho National Engineering and Environmental Laboratory for the treatment, storage, and disposal of current waste. This pilot program will demonstrate one system that can be used to charge onsite generators for the treatment and disposal of low-level radioactive waste. In FY 1997, mock billings will begin by July 15, 1997. Assuming approvals are received to do so, FY 1998 activities will include modifying the associated automated systems, testing and evaluating system performance, and estimating the amount generators will spend for waste storage, treatment, and disposal in FY 1999. If the program is fully implemented in FY 1999, generators will pay actual, automated bills for waste management services from funds transferred to their budgets from Environmental Management

  19. Results of monitoring at Olkiluoto in 2008. Foreign Materials

    International Nuclear Information System (INIS)

    Juhola, P.

    2009-08-01

    This report focuses on foreign materials introduced to ONKALO. These foreign materials are not part of the multi-barrier system or the natural environment. All the allowed materials introduced to ONKALO are included in the material handbook. All materials used in ONKALO 2008 are listed in this report. During 2008 the ONKALO access tunnel was excavated from chainage 2581 to chainage 3307 and the total excavated volume in 2008 was 38812 m 3 . During 2004 to 2008 the total excavated volume was 161060 m 3 . This report also summaries the total amount of foreign materials used in ONKALO since 2004. All waters used during the excavation of ONKALO are pumped up to the surface into a sedimentation pool. In 2008 water samples were taken from sedimentation pool and from the outlet ditch. The chemistry of these waters can predict us how the use of foreign materials has affected to the baseline groundwater chemistry. (orig.)

  20. Tuberculosis pediátrica en un hospital de referencia durante el período 2004-2008 Pediatric tuberculosis at a reference hospital during the 2004-2008 period

    Directory of Open Access Journals (Sweden)

    Mónica G. Rodríguez

    2011-03-01

    Full Text Available Se realizó un estudio retrospectivo y descriptivo de las muestras de pacientes pediátricos remitidas al laboratorio del Hospital Piñero durante el período 2004-2008 para el cultivo de micobacterias por sospecha de tuberculosis. Durante dicho período ingresaron un total de 8409 muestras, de las cuales 1542 (18% fueron pediátricas; de ellas 1407 (91% pulmonares y 135 extrapulmonares (9%. El procesamiento de las muestras incluyó baciloscopía, cultivo, identificación y prueba de sensibilidad. La nacionalidad de los pacientes pediátricos se distribuyó del siguiente modo: argentinos, 1218 (79%; extranjeros, 247 (16%, representados estos últimos por paraguayos, peruanos y sobre todo bolivianos. Para un 5% de los pacientes no fue informada la nacionalidad. La distribución por sexo fue: femenino, 787 pacientes (51%; masculino, 755 pacientes (49%. De acuerdo con la edad de los pacientes se obtuvo la siguiente distribución: 0 a 4 años, 674 niños (grupo A, 45%, 5 a 9 años, 354 niños (grupo B, 24%; y 10 a 15 años, 464 pacientes (grupo C, 31%. Las principales asociaciones mórbidas fueron desnutrición e infección por el virus de la inmunodeficiencia humana. La baciloscopía fue positiva en 41 muestras (2,6%, en tanto que la recuperación mediante cultivo alcanzó las 84 muestras (5,4%, 78 de ellas pulmonares y 6 extrapulmonares. Todas las cepas fueron identificadas como complejo Mycobacterium tuberculosis. Los aislamientos fueron sensibles a estreptomicina, isoniazida, rifampicina y etambutol, excepto una cepa resistente a etambutol y estreptomicina y otra resistente a isoniazida. La confirmación bacteriológica de la tuberculosis pediátrica es difícil de alcanzar debido a la presentación paucibacilar de las muestras, pero juega un papel fundamental en el diagnóstico de certeza, ya que permite la identificación y la realización de las pruebas de sensibilidad del aislamiento.Samples of pediatric patients suspected of tuberculosis

  1. Municipal Development Plan, Acerra (Naples

    Directory of Open Access Journals (Sweden)

    Luigi Benevolo

    2014-02-01

    Full Text Available The Municipal Development Plan (Piano Urbanistico Comunale - PUC of Acerra has been drafted by a group of young professionals and researchers, led by Leonardo Benevolo, in accordance with the guidelines laid out by Regional Law no. 16 of 2004. Its complex drafting process was compressed into a brief, nine-month period in 2008 and 2009, at the end of which its initial adoption (or “predisposizione” – “preparation” or “predisposition” – in Italian legal terms was ratified by the municipal council. This article reconstructs the key moments, illustrating the main elements of the plan and how the debate about it took shape both inside and outside the municipal administration.

  2. FY 1999 Annual Self-Evaluation Report of the Pacific Northwest National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Randy R. LaBarge

    1999-11-05

    This is a report of the Pacific Northwest National Laboratory's (Pacific Northwest's) FY1999 Annual Self-Evaluation Report. This report summarizes our progress toward accomplishment of the critical outcomes, objectives, and performance indicators as delineated in the FY1999 Performance Evaluation & Fee Agreement. It also summarizes our analysis of the results of Pacific Northwest's Division and Directorate annual self-assessments, and the implementation of our key operational improvement initiatives. Together, these provide an indication of how well we have used our Integrated Assessment processes to identify and plan improvements for FY2000. As you review the report you will find areas of significantly positive progress; you will also note areas where I believe the Laboratory could make improvements. Overall, however, I believe you will be quite pleased to note that we have maintained, or exceeded, the high standards of performance we have set for the Laboratory.

  3. Diseño e implantación de un sistema integrado de calidad y medio ambiente (ISO 9001: 2008 e ISO14001:2004) en una empresa de obra civil

    OpenAIRE

    Campano Calleja, Juan Manuel

    2012-01-01

    El Proyecto Fin de Carrera tiene como objetivos el diseño, desarrollo e implantación de un Sistema de Gestión Integrado de Calidad y de Medio Ambiente según las normas ISO 9001:2008 e ISO 14001:2004 para una empresa ficticia llamada MID EXCAVACIONES S.L.

  4. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  5. FY 1990/FY 1991 Biennial Budget Descriptive Summaries for the Strategic Defense Initiative Organization

    Science.gov (United States)

    1989-01-01

    reduction in cryccooler size. o (U) Develop the first diamond ME_2 with monocrystalline , semiconductor quality thin-film diamcnd. o (U) Develop Atomic Layer...stiffness and dynamic response. A lightweight thermal radiator panel will also be fabricated and tested. Fabrication of tubes and sheets in gauges...FY 91 o Precision Gimbal Test IQ FY 91 C Cx:mlete Deveic..ent of Integrated Structures Model 2Q FY 91 c Light’weight Ccmpcsitas Radiator Panel Demo 2Q

  6. Technology Integration Division FY 1992 Public Participation Program Management and Implementation Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The mission of the Office of Technology Development (OTD), to develop and apply existing and innovative environmental restoration and waste management technologies to the cleanup to Department of Energy (DOE) sites and facilities in accordance with applicable regulations, is to be carried out through the central mechanisms of the Integrated Demonstration (ID) and Integrated Program (IP). Regulations include provisions for public participation in DOE decision making regarding IDs. Beyond these requirements, DOE seeks to foster a more open culture in which public participation, based on two-way communication between DOE and the public, is not only welcomed, but actively encouraged. The public to which the Program is addressed actually consists of several distinct ''publics:'' state and local government officials; Indian tribes; citizen groups and individuals concerned about specific issues; citizen groups or individuals who are opinion leaders in their communities; other federal agencies; private industry; and academia involved in IDs. Participation of these publics in decision making means that their concerns, needs, objectives, and other input are identified by two-way communication between them and DOE, and that these factors are considered when decisions made about OTD activities. This plan outlines the TIPs Public Participation Program goals, objectives, and steps to be taken during Fiscal Year (FY) 1992 to move toward those goals and objectives, based on the challenges and opportunities currently recognized or assumed

  7. Long-range research plan. FY 1987-FY 1991. Volume 3

    International Nuclear Information System (INIS)

    1986-08-01

    The Long-Range Research Plan (LRRP) was prepared by the Office of Nuclear Regulatory Research (RES) to assist the NRC in coordinating its long-range research planning with the short-range budget cycles. The LRRP lays out programmatic approaches for research to help resolve regulatory issues. The plan will be updated annually. It covers: operating reactor inspection, maintenance, and repair; equipment qualification; seismic research; reactor operations and risk; thermal-hydraulic transients; severe accidents; radiation protection and health effects; and waste management

  8. Long-Range Research Plan, FY 1986-FY 1990. Volume 2

    International Nuclear Information System (INIS)

    1985-08-01

    The Long-Range Research Plan (LRRP) was prepared by the Office of Nuclear Regulatory Research (RES) to assist the NRC in coordinating its long-range research planning with the short-range budget cycles. The LRRP lays out programmatic approaches for research to help resolve regulatory issues. The plan will be updated annually. It covers: operating reactor inspection, maintenance, and repair; equipment qualification; seismic research; reactor operations and risk; thermal-hydraulic transients; severe accidents; radiation protection and health effects; and waste management

  9. Advanced Planning Briefing for Industry Proceedings, 15-16 September 1987.

    Science.gov (United States)

    1987-09-01

    effort, 3 demos planned for FY88, and concept studies continuing on the under armor mortar concepts. We need your participation in pursuing innovative...our under armor mortar concepts, and continued emphasis on automation and crew reduction in future self- propelled artillery systems. Thank you for...activity relating to some as-of-yet unknown composite technology. The under armor mortar may also be a full fledged program in the FY89 to FY93

  10. Musculoskeletal pain: prescription of NSAID and weak opioid by primary health care physicians in Sweden 20042008 – a retrospective patient record review

    Directory of Open Access Journals (Sweden)

    Metha Brattwall

    2010-08-01

    Full Text Available Metha Brattwall1, Ibrahim Turan2, Jan Jakobsson31Department of Anaesthesia, Institute for Clinical Sciences at Sahlgrenska Academy, Mölndal Hospital, Gothenburg, Sweden; 2Foot and Ankle Surgical Centre, Stockholm, Sweden; 3Karolinska Institutet, Institution for Physiology and Pharmacology, Department of Anaesthesia, Stockholm, SwedenPurpose: To study the prescription of oral analgesics for musculoskeletal pain by primary care physicians over a 5-year period in Sweden.Design: A retrospective automatic database review of patient records at four primary health care centers. All prescriptions of NSAIDs, weak opioids, and coprescriptions of gastroprotecting medications to patients with musculoskeletal were retrieved for the period January 1, 2004 to November 11, 2008.Results: A total of 27,067 prescriptions prescribed to 23,457 patients with musculoskeletal pain were analyzed. Of all prescriptions, NSAIDs were the most commonly prescribed analgesic comprising 79%, tramadol was the second most commonly prescribed analgesic comprising 9%, codeine the third most (7%, and dextropropoxyphene the fourth (5%. The proportion of NSAIDs and weak opioids and the proportion of the different weak opioids prescribed showed no change over time. The proportion of nonselective and selective NSAIDs prescribed changed; Coxib prescriptions decreased from 9% to 4% of all analgesics prescribed in 2004–2007 with no change in 2008.Conclusion: NSAIDs were found to be the dominant class of analgesic prescribed by primary care physicians to patients diagnosed as musculoskeletal pain. No change was observed in the proportion of NSAID and weak opioid prescription over the period studied. Prescription of selective Coxibs decreased and was less than 4% in 2008. The impact on gastrointestinal and cardiovascular adverse effects associated with the extensive prescription of NSAIDS for musculoskeletal pain warrants further analysis.Keywords: nonsteroidal anti-inflammatory drugs

  11. Trends in U.S. Global AIDS Spending: FY2000-FY2008

    Science.gov (United States)

    2008-07-16

    Young Women from HIV/AIDS: The Case Against Child and Adolescent Marriage.” International Family Planning Perspectives, Volume 32, Number 2, June...are more likely to contract HIV than their single counterparts.63 For example, 30% of married adolescents ’ spouses were HIV-positive in Kenya, while...includes language similar CRS-26 69 Ensuring Access to Contraceptives Act of 2007, H.R. 2367. 70 According to the UNAIDS website, “[an] in-depth

  12. 77 FR 4337 - Notice of the FY 2011 Substantial Amendment Process and Other Related Information for Recipients...

    Science.gov (United States)

    2012-01-27

    ... Program Funds AGENCY: Office of Assistant Secretary for Community Planning and Development, HUD. ACTION... ESG, please submit them to the HUD Homelessness Resource Exchange Virtual Help Desk at http://www.... Mercedes M. M[aacute]rquez, Assistant Secretary for Community Planning and Development. Appendix A: FY 2011...

  13. Institutional Plan, FY 1995--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-10-01

    Sandia recently completed an updated strategic plan, the essence of which is presented in chapter 4. Sandia`s Strategic Plan 1994 takes its direction from DOE`s Fueling a Competitive Economy: Strategic Plan and provides tangible guidance for Sandia`s programs and operations. Although it is impossible to foresee precisely what activities Sandia will pursue many years from now, the strategic plan makes one point clear: the application of our scientific and engineering skills to the stewardship of the nation`s nuclear deterrent will be central to our service to the nation. We will provide the necessary institutional memory and continuity, experience base, and technical expertise to ensure the continued safety, security, and reliability of the nuclear weapons stockpile. As a multiprogram laboratory, Sandia will also continue to focus maximum effort on a broad spectrum of other topics consistent with DOE`s enduring core mission responsibilities: Defense (related to nuclear weapons), Energy, Environment (related to waste management and environmental remediation), and Basic Science.

  14. Annual Performance Report - FY 2011

    Science.gov (United States)

    This report summarizes OIG activity, performance, results, and challenges, and provides a financial accounting of resources for fiscal year (FY) 2011 compared to our FY 2011 annual performance targets.

  15. Areva group. Result, first half 2004

    International Nuclear Information System (INIS)

    2004-09-01

    Areva, a world nuclear industry leader, provides by this document information and key data on the performance and detailed financial data of the first half 2004. The transmission and distribution integration plan 2004-2006 is also detailed. (A.L.B.)

  16. Long-range research plan: FY 1984-FY 1988

    International Nuclear Information System (INIS)

    1982-08-01

    Information is presented concerning planned research activities related to LOCA and transients; LOFT; accident evaluation and mitigation; LMFBR and HTGR type reactors; facility operations and safeguards; waste management; siting and environment; and system and reliability analysis

  17. FY 1999 Report on overseas geological structure surveys. Joint Japan-China Yu Xian exploitation project (Attachments); 1999 nendo kaigai chishitsu kozo nado chosa futai shiryo. Nippon Chugoku sekitan kyodo tansa Yu Xian project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This reports provides the attachments for the report JN0041264. The contents include (1) minutes of the fourth steering committee, (2) technical reports presented to the fourth steering committee (I: report on FY 1998 joint exploitation works, and II: report on FY 1999 joint exploitation works), (3) minutes of the fifth steering committee, and (4) technical reports presented to the fifth steering committee (I: report on FY 1999 joint exploitation works, and II: report on planned FY 2000 joint exploitation works). The item (1) includes approval of the reports on FY 1998 and 1999 joint exploitation works. The item (2)-I report includes seismic exploitation test works, observation work results and quality evaluation thereof; drilling exploitation work results, quality evaluation thereof, exploitation results and evaluation thereof; exploitation results and evaluation thereof; and proposals. The item (2)-II report includes seismic exploitation, drilling exploitation, and man-hours of the workers from the both countries. The item (3) includes approval of the reports on FY 1999 joint exploitation works and planned FY 2000 joint exploitation works. The (4)-I report includes seismic exploitation work results and evaluation thereof, seismic exploitation test works, drilling exploitation work results, quality evaluation thereof, exploitation results and evaluation thereof, and proposals for the future works. The (4)-II report includes seismic and drilling exploitation plans, and numbers and periods of the workers from the both countries. (NEDO)

  18. National plan of allocation of CO2 emission quotas

    International Nuclear Information System (INIS)

    2006-01-01

    The directive 2003/87/CE of the European parliament and council from October 13, 2003 establishes a trading system of CO 2 emission quotas for some companies of the energy generation industry, of the manufacturing industry and of services. These quotas are tradable and negotiable and an initial amount of quotas is allocated to these companies according to their facilities in concern. The national plan of quotas allocation must precise the total amount of tradable emissions and its share among the different sectors of activity and facilities. The first project of allocation plan was transmitted to the European Commission on July 6, 2004 after its public consultation between June 8 and June 29 2004. Modifications have been added to meet the requests of the Commission and the French plan was finally approved on December 17, 2004 for an annual amount of 156.51 Mt of CO 2 quotas during the 2005-2007 period. This paper precises the modifications requested by the commission, the modifications of the French juridical system necessary to complete the implementation of the French part of the European quotas trading system, the elaboration of the next allocation plan for the 2008-2012 period, and the link between the European emissions trading system and the 'joint implementation' and 'clean development ' mechanisms implemented by the Kyoto protocol. (J.S.)

  19. Nevada Test Site-Directed Research, Development, and Demonstration

    International Nuclear Information System (INIS)

    Will Lewis, Compiler

    2006-01-01

    The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did an exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R and D projects, as presented in this report

  20. UMTRA water sampling and analysis plan, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1993-09-01

    The purpose of this document is to provide background, guidance, and justification for fiscal year (FY) 1994 water sampling activities for the uranium mil tailings site at Tuba City, Arizona. This sampling and analysis plan will form the basis for groundwater sampling and analysis work orders to be implemented in FY94

  1. Strategy for Meeting the Secretary of Energy and Hanford Site FY 2001 Pollution Prevention Goals

    International Nuclear Information System (INIS)

    CLARK, D.E.

    2000-01-01

    The purpose of this strategy is to identify the Fiscal Year (FY) 2001 Hanford Site waste reduction, sanitary recycling and affirmative procurement goals and identify the action required to ensure that the Secretary of Energy's FY 2005 pollution prevention and the FY 2001 Hanford Site goals are met. The strategy and plan to ensure that the Secretary of Energy's routine waste reduction, recycling, cleanup/stabilization waste and affirmative procurement goals are met consists of four phases. The first phase is to ensure that the infrastructure is in place to support planning and organization. This phase involves ensuring that roles and responsibilities are identified; requirement documents are current; goals and successes are communicated; and accurate and current waste information is available. Roles and responsibilities are identified and the RL requirement documents (i.e., the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan and Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation) will specify the Secretary of Energy's goals. Goals will be communicated formally and informally via the Hanford Reach, training sessions, meetings and correspondence. Sharing of pollution prevention successes and goal progress are encouraged at the Pollution Prevention/Waste Minimization (PZ/WMin) quarterly meetings. Existing site waste generation databases will be utilized to provide current waste generation data. The second phase of the strategy and plan is to establish and allocate goals by prime contractor (i.e. Fluor Hanford, Inc. (FH), Pacific Northwest National Laboratory (PNNL), Bechtel Hanford Inc. (BHI), and CH2MHill Hanford Group (CHG)). This requires determining current status toward meeting the Secretary of Energy's goals; establishing the Hanford Site FY goals, and allocating waste reduction goals by prime contractor. The third phase of the strategy and plan is goal implementation. This

  2. Savannah River Site's Site Specific Plan

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  3. LSTA Allotments (FY 2003-2016)

    Data.gov (United States)

    Institute of Museum and Library Services — Review Library Services and Technology Act (LSTA) allotments by state from FY 2003 to FY 2016. The Grants to States program is the largest source of federal funding...

  4. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  5. Site specific plan

    International Nuclear Information System (INIS)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs

  6. NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2013 and FY2014

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Julianne J. [Desert Research Inst. (DRI), Las Vegas, NV (United States); Nikolich, George [Desert Research Inst. (DRI), Las Vegas, NV (United States); Mizell, Steve [Desert Research Inst. (DRI), Las Vegas, NV (United States); McCurdy, Greg [Desert Research Inst. (DRI), Las Vegas, NV (United States); Campbell, Scott [Desert Research Inst. (DRI), Las Vegas, NV (United States)

    2016-09-01

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of Nevada Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. Emphasis is given to collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans that are being developed, which will facilitate appropriate closure design and postclosure monitoring. Desert Research Institute installed two meteorological monitoring stations south (station number 1) and north (station number 2) of the Plutonium Valley CA and a runoff sediment sampling station within the CA in 2011. Temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and airborne particulate concentration are collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters is recorded for each 10-minute interval. The sediment sampling station includes an automatically activated ISCO sampling pump with collection bottles for suspended sediment, which is activated when sufficient flow is present in the channel, and passive traps for bedload material that is transported down the channel during runoff events. This report presents data collected from these stations during FY2013 and FY2014.

  7. NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2013 and FY2014

    International Nuclear Information System (INIS)

    Miller, Julianne J.; Nikolich, George; Mizell, Steve; McCurdy, Greg; Campbell, Scott

    2016-01-01

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of Nevada Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. Emphasis is given to collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans that are being developed, which will facilitate appropriate closure design and postclosure monitoring. Desert Research Institute installed two meteorological monitoring stations south (station number 1) and north (station number 2) of the Plutonium Valley CA and a runoff sediment sampling station within the CA in 2011. Temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and airborne particulate concentration are collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters is recorded for each 10-minute interval. The sediment sampling station includes an automatically activated ISCO sampling pump with collection bottles for suspended sediment, which is activated when sufficient flow is present in the channel, and passive traps for bedload material that is transported down the channel during runoff events. This report presents data collected from these stations during FY2013 and FY2014.

  8. FY 10 Multifamily Initial Endorsements

    Data.gov (United States)

    Department of Housing and Urban Development — In FY 2010, HUD's Multifamily's 18 Hubs initially endorsed 1011 loans totaling $11.3 billion and providing 170,672 units/ beds. FY 10's $11.3 billion is the highest...

  9. Iowa's Forests 2008

    Science.gov (United States)

    Mark D. Nelson; Matt Brewer; Christopher W. Woodall; Charles H. Perry; Grant M. Domke; Ronald J. Piva; Cassandra M. Kurtz; W. Keith Moser; Tonya W. Lister; Brett J. Butler; Dacia M. Meneguzzo; Patrick D. Miles; Charles J. Barnett; Dale Gormanson

    2011-01-01

    The second full annual inventory of Iowa's forests (2004-2008) reports more than 3 million acres of forest land, almost all of which is timberland (98 percent), with an average volume of more than 1,000 cubic feet of growing stock per acre. American elm and eastern hophornbeam are the most numerous tree species, but silver maple and bur oak predominate in terms of...

  10. High-Level Waste Systems Plan. Revision 7 (U)

    International Nuclear Information System (INIS)

    Brooke, J.N.; Gregory, M.V.; Paul, P.; Taylor, G.; Wise, F.E.; Davis, N.R.; Wells, M.N.

    1996-10-01

    This revision of the High-Level Waste (HLW) System Plan aligns SRS HLW program planning with the DOE Savannah River (DOE-SR) Ten Year Plan (QC-96-0005, Draft 8/6), which was issued in July 1996. The objective of the Ten Year Plan is to complete cleanup at most nuclear sites within the next ten years. The two key principles of the Ten Year Plan are to accelerate the reduction of the most urgent risks to human health and the environment and to reduce mortgage costs. Accordingly, this System Plan describes the HLW program that will remove HLW from all 24 old-style tanks, and close 20 of those tanks, by 2006 with vitrification of all HLW by 2018. To achieve these goals, the DWPF canister production rate is projected to climb to 300 canisters per year starting in FY06, and remain at that rate through the end of the program in FY18, (Compare that to past System Plans, in which DWPF production peaked at 200 canisters per year, and the program did not complete until 2026.) An additional $247M (FY98 dollars) must be made available as requested over the ten year planning period, including a one-time $10M to enhance Late Wash attainment. If appropriate resources are made available, facility attainment issues are resolved and regulatory support is sufficient, then completion of the HLW program in 2018 would achieve a $3.3 billion cost savings to DOE, versus the cost of completing the program in 2026. Facility status information is current as of October 31, 1996

  11. Field study plan for alternate barriers

    International Nuclear Information System (INIS)

    Freeman, H.D.; Gee, G.W.; Relyea, J.F.

    1989-05-01

    Pacific Northwest Laboratory (PNL) is providing technical assistance in selecting, designing, evaluating, and demonstrating protective barriers. As part of this technical assistance effort, asphalt, clay, and chemical grout will be evaluated for use as alternate barriers. The purpose of the subsurface layer is to reduce the likelihood that extreme events (i.e., 100-year maximum storms, etc.) will cause significant drainage through the barrier. The tests on alternate barriers will include laboratory and field analysis of the subsurface layer performance. This field test plan outlines the activities required to test and design subsurface moisture barriers. The test plan covers activities completed in FY 1988 and planned through FY 1992 and includes a field-scale test of one or more of the alternate barriers to demonstrate full-scale application techniques and to provide performance data on a larger scale. Tests on asphalt, clay, and chemical grout were initiated in FY 1988 in small (30.5 cm diameter) tube-layer lysimeters. The parameters used for testing the materials were different for each one. The tests had to take into account the differences in material characteristics and response to change in conditions, as well as information provided by previous studies. 33 refs., 8 figs., 1 tab

  12. 2008 Enterprise Transition Plan (ETP)

    National Research Council Canada - National Science Library

    England, Gordon

    2008-01-01

    The Enterprise Transition Plan (ETP) is the Department of Defense's integrated business transformation plan, which incorporates the transition plans of the Military Services, Components and the DoD Enterprise...

  13. Annual Transportation Report for Radioactive Waste Shipments to and from the Nevada Test Site

    International Nuclear Information System (INIS)

    2009-01-01

    In February 1997, the U.S. Department of Energy (DOE), Nevada Operations Office (now known as the Nevada Site Office) issued the Mitigation Action Plan which addressed potential impacts described in the 'Final Environmental Impact Statement for the Nevada Test Site and Off-Site Locations in the State of Nevada' (DOE/EIS 0243). The U.S. Department of Energy, Nevada Operations Office committed to several actions, including the preparation of an annual report, which summarizes waste shipments to and from the Nevada Test Site (NTS) Radioactive Waste Management Site (RWMS) at Area 5 and Area 3. No shipments were disposed of at Area 3 in fiscal year (FY) 2008. This document satisfies requirements regarding low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) transported to or from the NTS during FY 2008. No transuranic (TRU) waste shipments were made from or to the NTS during FY 2008

  14. Southwestern Power Administration Annual Report 2008

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-12-01

    Dear Secretary Chu, I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2008. In FY 2008, Southwestern delivered over 7.3 billion kilowatt-hours of energy to its wholesale customers – nearly 31% more than average due to numerous record rainfall amounts in the southwest region. These record amounts produced revenues which exceeded the average annual revenue requirement by nearly $20 million and resulted in over $200 million in economic benefits to the region. Yet even as Southwestern exceeded its goals of marketing and delivering Federal hydroelectric power to our customers, we stayed focused on safety, security, and reliability. For example, we maintained our nearly 1,400 miles of high-voltage transmission lines, substations, and communications sites while achieving a Recordable Accident Frequency Rate of 0.0, a record that reflects Southwestern’s safety achievement of no recordable injuries for every 200,000 hours worked. We kept our rights-of-way secure from vegetation and other obstacles, work that not only supports our mission but also promotes reliability of the regional and National grid. We exceeded all North American Electric Reliability Corporation (NERC) Control Performance Standards (CPS- 1 and CPS-2), and maintained regulation and reserve obligations and reactive reserve margins to ensure the reliability of the bulk electric system, even during extended periods of restricted hydro operations due to unusually high project inflows. Finally, we continued our partnerships with the Department of Energy, the U.S. Army Corps of Engineers, our customers, and other Federal power stakeholders, partnerships that are vital to our continued success in marketing and delivering carbon-free, renewable, and domestically produced energy to our customers and to the Nation. Sincerely, Jon Worthington Administrator

  15. Plan national stratégique de lutte contre les IST/VIH/Sida, 2008-2012

    OpenAIRE

    Ouahdi, Mohamed

    2009-01-01

    Présente le Plan national stratégique 2008 – 2012 qui orientera la lutte contre les IST/VIH/Sida durant les cinq prochaines années. L'objectif du plan est de prévenir de nouvelles infections, d'élargir l'accès aux soins de santé et d'atténuer l'impact de l'épidémie au vu d'atteindre les objectifs de développement pour le Millénaire notamment celui consistant à stopper et commencer à inverser l'épidémie du VIH/sida d'ici à 2015.

  16. Waste minimization and pollution prevention awareness plan. Revision 1

    International Nuclear Information System (INIS)

    1994-07-01

    The purpose of this plan is to document Lawrence Livermore National Laboratory (LLNL) projections for present and future waste minimization and pollution prevention. The plan specifies those activities and methods that are or will be used to reduce the quantity and toxicity of wastes generated at the site. It is intended to satisfy Department of Energy (DOE) requirements. This Waste Minimization and Pollution Prevention Awareness Plan provides an overview of projected activities from FY 1994 through FY 1999. The plans are broken into site-wide and problem-specific activities. All directorates at LLNL have had an opportunity to contribute input, estimate budgets, and review the plan. In addition to the above, this plan records LLNL's goals for pollution prevention, regulatory drivers for those activities, assumptions on which the cost estimates are based, analyses of the strengths of the projects, and the barriers to increasing pollution prevention activities

  17. Assessment of environmental measures in the Dutch Tax Plan 2008

    International Nuclear Information System (INIS)

    2007-09-01

    The environmental measures that were included in the Dutch Tax plan 2008 have been evaluated for their CO2 effects. In addition, the effects on NOx and PM10 emissions have been quantified. They are the following measures: (1) Environmental differentiation of cars Clean and efficient; (2) Adjustment of addition for private use of company cars; (3) Additional financial burden environment unfriendly fuels/energy; (4) Introduction of air passenger tax (350 million euro) (5) Shift from BPM1 to MRB2; (6) Balancing energy tax for sustainably generated electricity for small consumers; (7) Introduction of packaging tax; (8) Adjustment of the tariff of waste for shredder. The effects of measures 2,7 and 8 have not been assessed by MNP (Netherlands Environmental Assessment Agency). [mk] [nl

  18. Technical Issues Map for the NHI System Interface and Support Systems Area: 3rd Quarter FY 07

    International Nuclear Information System (INIS)

    Steven R. Sherman

    2007-01-01

    This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway. The technical issues are ranked according to priority and by assumed resolution dates. Due to funding limitations, not all high-priority technical issues are under study at the present time, and more resources will need to be dedicated to tackling such issues in the future. This technical issues map is useful for understanding the relative importance of various technical challenges and will be used as a planning tool by the NHI technical leadership for future work package planning. The technical map in its present form will be discontinued in FY08 and will be folded into a larger NHI System Interface and Support Systems project management plan and scope baseline statement in FY08

  19. Research and development strategic plan : FY2013-FY2017.

    Science.gov (United States)

    2013-05-01

    This plan describes the strategy through which the Federal Railroad Administrations (FRAs) research and development (R&D) program will support the Department of Transportations (DOTs) mission and goals. Safety is the DOTs primary strat...

  20. Assessment Report Sandia National Laboratories Fuel Cycle Technologies Quality Assurance Evaluation of FY15 SNL FCT M2 Milestone Deliverables

    International Nuclear Information System (INIS)

    Appel, Gordon John

    2016-01-01

    Sandia National Laboratories (SNL) Fuel Cycle Technologies (FCT) program activities are conducted in accordance with FCT Quality Assurance Program Document (FCT-QAPD) requirements. The FCT-QAPD interfaces with SNL approved Quality Assurance Program Description (SNL-QAPD) as explained in the Sandia National Laboratories QA Program Interface Document for FCT Activities (Interface Document). This plan describes SNL's FY16 assessment of SNL's FY15 FCT M2 milestone deliverable's compliance with program QA requirements, including SNL R&A requirements. The assessment is intended to confirm that SNL's FY15 milestone deliverables contain the appropriate authenticated review documentation and that there is a copy marked with SNL R&A numbers.

  1. Assessment Report Sandia National Laboratories Fuel Cycle Technologies Quality Assurance Evaluation of FY15 SNL FCT M2 Milestone Deliverables

    Energy Technology Data Exchange (ETDEWEB)

    Appel, Gordon John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-05-01

    Sandia National Laboratories (SNL) Fuel Cycle Technologies (FCT) program activities are conducted in accordance with FCT Quality Assurance Program Document (FCT-QAPD) requirements. The FCT-QAPD interfaces with SNL approved Quality Assurance Program Description (SNL-QAPD) as explained in the Sandia National Laboratories QA Program Interface Document for FCT Activities (Interface Document). This plan describes SNL's FY16 assessment of SNL's FY15 FCT M2 milestone deliverable's compliance with program QA requirements, including SNL R&A requirements. The assessment is intended to confirm that SNL's FY15 milestone deliverables contain the appropriate authenticated review documentation and that there is a copy marked with SNL R&A numbers.

  2. Fiscal year 1987 program plan

    International Nuclear Information System (INIS)

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research ampersand Development (R ampersand D), the organizational interfaces and communication channels for R ampersand D and the establishment of procedures for planning, reporting, and budgeting of Operations and R ampersand D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years

  3. Idaho National Laboratory Integrated Safety Management System FY 2013 Effectiveness Review and Declaration Report

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, Farren [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for Fiscal Year (FY) 2014. Results of the FY 2013 annual effectiveness review demonstrate that the INL’s ISMS program is “Effective” and continually improving and shows signs of being significantly strengthened. Although there have been unacceptable serious events in the past, there has also been significant attention, dedication, and resources focused on improvement, lessons learned and future prevention. BEA’s strategy of focusing on these improvements includes extensive action and improvement plans that include PLN 4030, “INL Sustained Operational Improvement Plan, PLN 4058, “MFC Strategic Excellence Plan,” PLN 4141, “ATR Sustained Excellence Plan,” and PLN 4145, “Radiological Control Road to Excellence,” and the development of LWP 20000, “Conduct of Research.” As a result of these action plans, coupled with other assurance activities and metrics, significant improvement in operational performance, organizational competence, management oversight and a reduction in the number of operational events is being realized. In short, the realization of the fifth core function of ISMS (feedback and continuous improvement) and the associated benefits are apparent.

  4. Outcome of planned home births compared to hospital births in Sweden between 1992 and 2004. A population-based register study.

    Science.gov (United States)

    Lindgren, Helena E; Rådestad, Ingela J; Christensson, Kyllike; Hildingsson, Ingegerd M

    2008-01-01

    The aim of this population-based study was to measure the risk of adverse outcome for mother and child in planned home births in a Swedish population irrespective of where the birth actually occurred, at home or in hospital after transfer. A population-based study using data from the Swedish Medical Birth Register. Sweden 1992-2004. A total of 897 planned home births were compared with a randomly selected group of 11,341 planned hospital births. Prevalence of mortality and morbidity among mothers and children, emergency conditions, instrumental and operative delivery and perineal lacerations were compared. During this period in Sweden the neonatal mortality rate was 2.2 per thousand in the home birth group and 0.7 in the hospital group (RR 3.6, 95% CI 0.2-14.7). No cases of emergency complications were found in the home birth group. The risk of having a sphincter rupture was lower in the planned home birth group (RR 0.2, 95% CI 0.0-0.7). The risk of having a cesarean section (RR 0.4, 95% CI 0.2-0.7) or instrumental delivery (RR 0.3, 95% CI 0.2-0.5) was significantly lower in the planned home birth group. In Sweden, between 1992 and 2004, the intrapartum and neonatal mortality in planned home births was 2.2 per thousand. The proportion is higher compared to hospital births but no statistically significant difference was found. Women in the home birth group more often experienced a spontaneous birth without medical intervention and were less likely to sustain pelvic floor injuries.

  5. Dietary Changes over 25 Years in Tianjin Residents: Findings from the 1986–1988, 2000–2004, and 2008–2011 Nutrition Surveys

    Directory of Open Access Journals (Sweden)

    Xuan Wang

    2016-01-01

    Full Text Available In China, the rates of chronic diseases characteristic of countries in nutritional transition have been increasing. However, few studies have examined diet changes in recent decades. We analyzed dietary changes in Tianjin, China. The data in this descriptive, population-based study in ≥18-year-old adults were collected from three surveys from 1986 to 2011. Food consumption and nutrient intake were compared among the three surveys separately for urban and rural areas. Differences in food consumption between urban and rural areas in different periods were also shown. The consumption of cereals, vegetables, and oils decreased, and that of fruits and beans increased in both urban and rural areas. Moreover, the total consumption of animal foods, especially milk, increased (0.01% in 1986–1988; 1.72% in 2008–2011 in rural areas. Although milk consumption also increased in urban areas, consumption of other animal foods decreased (19.33% in 1986–1988; 13.74% in 2008–2011. Meanwhile, cereals consumption rebounded from 22.63% in 2000–2004 to 29.75% in 2008–2011. Moreover, the lack of dairy products and some nutrients, e.g., retinol, calcium, and dietary fiber (<80% of recommended nutrient intake, in the diet persisted in both urban and rural areas. In conclusion, differences in diet between urban and rural areas decreased over time.

  6. Report of the review committee on evaluation of the research subjects in the field of advanced science research (FY2000)

    International Nuclear Information System (INIS)

    2000-10-01

    On the basis of the JAERI's Basic Guidelines for the Research Evaluation Methods and the Practices Manuals of the Institution Evaluation Committee, the Ad Hoc Review Committee composed of eight experts was set up under the Research Evaluation Committee of the JAERI in order to review the research themes completed in FY1999, those to be ended through FY2000, and those planned for five years starting in FY2001 in the Advanced Science Research Center. The Ad Hoc Review Committee meeting was held on July 17, 2000. According to the review methods including review items, points of review and review criteria, determined by the Research Evaluation Committee, the review was conducted based on the research result/plan documents submitted in advance and presentations by the Research Group Leaders. The review report was submitted to the Research Evaluation Committee for further review and discussions in its meeting held on August 31, 2000. The Research Evaluation Committee recognized the review results as appropriate. This report describes the review results. (author)

  7. ISV technology development plan for buried waste

    International Nuclear Information System (INIS)

    Nickelson, D.F.; Callow, R.A.; Luey, J.K.

    1992-07-01

    This report identifies the main technical issues facing the in situ vitrification (ISV) application to buried waste, and presents a plan showing the top-level schedule and projected resources needed to develop and demonstrate the technology for meeting Environmental Restoration Department (ERD) needs. The plan also proposes a model strategy for the technology transfer from the Department of Energy's Office of Technology Development (DOE-OTD) to the Office of Environmental Restoration (DOE-ER) as the technology proceeds from issues resolution (development) to demonstration and remedial readiness. Implementation of the plan would require $34,91 1K in total funding to be spread in the years FY-93 through FY-98. Of this amount, $10,183K is planned to be funded by DOE-OTD through the ISV Integrated Program. The remaining amount, $24,728K, is recommended to be split between the Department of Energy (DOE) Office of Technology Development ($6,670K) and DOE Office of Environmental Restoration ($18,058K)

  8. Prediction of External Corrosion for Steel Cylinders--2004 Report

    International Nuclear Information System (INIS)

    Schmoyer, RLS

    2004-01-01

    Depleted uranium hexafluoride (UF 6 ) is stored in over 60,000 steel cylinders at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee, at the Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky, and at the Portsmouth Gaseous Diffusion Plant (PORTS) in Portsmouth, Ohio. The cylinders range in age from 4 to 53 years. Although when new the cylinders had wall thicknesses specified to within manufacturing tolerances, over the years corrosion has reduced their actual wall thicknesses. The UF 6 Cylinder Project is managed by the United States Department of Energy (DOE) to safely maintain the UF 6 and the cylinders containing it. This report documents activities that address UF 6 Cylinder Project requirements and actions involving forecasting cylinder wall thicknesses. These requirements are delineated in the System Requirements Document (LMES 1997a), and the actions needed to fulfill them are specified in the System Engineering Management Plan (LMES 1997b). The report documents cylinder wall thickness projections based on models fit to ultrasonic thickness (UT) measurement data. UT data is collected at various locations on randomly sampled cylinders. For each cylinder sampled, the minimum UT measurement approximates the actual minimum thickness of the cylinder. Projections of numbers of cylinders expected to fail various thickness criteria are computed from corrosion models relating minimum wall thickness to cylinder age, initial thickness estimates, and cylinder subpopulations defined in terms of plant site, yard, top or bottom storage positions, nominal thickness, etc. In this report, UT data collected during FY03 is combined with UT data collected in earlier years (FY94-FY02), and all of the data is inventoried chronologically and by various subpopulations. The UT data is used to fit models of maximum pit depth and minimum thickness, and the fitted models are used to extrapolate minimum thickness estimates into the future and in turn to compute

  9. FY2000 Annual Self-Evaluation Report for the Pacific Northwest National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    RR Labarge

    2000-11-15

    This self-evaluation report offers a summary of results from FY2000 actions to achieve Pacific Northwest National Laboratory's strategy and provides an analysis of the state of their self-assessment process. The result of their integrated planning and assessment process identifies Laboratory strengths and opportunities for improvement. Critical elements of that process are included in this report; namely, a high-level summary of external oversight activities, progress against Operations Improvement Initiatives, and a summary of Laboratory strengths and areas for improvement developed by management from across the laboratory. Some key areas targeted for improvement in FY2001 are: systems approach to resource management; information protection; integrated safety management flow-down to the benchtop; cost management; integrated assessment; Price Anderson Amendments Act (PAAA) Program; and travel risk mitigation.

  10. VERA-CS Verification & Validation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Downar, Thomas [Univ. of Michigan, Ann Arbor, MI (United States)

    2017-02-01

    This report summarizes the current status of VERA-CS Verification and Validation for PWR Core Follow operation and proposes a multi-phase plan for continuing VERA-CS V&V in FY17 and FY18. The proposed plan recognizes the hierarchical nature of a multi-physics code system such as VERA-CS and the importance of first achieving an acceptable level of V&V on each of the single physics codes before focusing on the V&V of the coupled physics solution. The report summarizes the V&V of each of the single physics codes systems currently used for core follow analysis (ie MPACT, CTF, Multigroup Cross Section Generation, and BISON / Fuel Temperature Tables) and proposes specific actions to achieve a uniformly acceptable level of V&V in FY17. The report also recognizes the ongoing development of other codes important for PWR Core Follow (e.g. TIAMAT, MAMBA3D) and proposes Phase II (FY18) VERA-CS V&V activities in which those codes will also reach an acceptable level of V&V. The report then summarizes the current status of VERA-CS multi-physics V&V for PWR Core Follow and the ongoing PWR Core Follow V&V activities for FY17. An automated procedure and output data format is proposed for standardizing the output for core follow calculations and automatically generating tables and figures for the VERA-CS Latex file. A set of acceptance metrics is also proposed for the evaluation and assessment of core follow results that would be used within the script to automatically flag any results which require further analysis or more detailed explanation prior to being added to the VERA-CS validation base. After the Automation Scripts have been completed and tested using BEAVRS, the VERA-CS plan proposes the Watts Bar cycle depletion cases should be performed with the new cross section library and be included in the first draft of the new VERA-CS manual for release at the end of PoR15. Also, within the constraints imposed by the proprietary nature of plant data, as many as possible of the FY17

  11. Monitoring lava-dome growth during the 2004-2008 Mount St. Helens, Washington, eruption using oblique terrestrial photography

    Science.gov (United States)

    Major, J.J.; Dzurisin, D.; Schilling, S.P.; Poland, Michael P.

    2009-01-01

    We present an analysis of lava dome growth during the 20042008 eruption of Mount St. Helens using oblique terrestrial images from a network of remotely placed cameras. This underutilized monitoring tool augmented more traditional monitoring techniques, and was used to provide a robust assessment of the nature, pace, and state of the eruption and to quantify the kinematics of dome growth. Eruption monitoring using terrestrial photography began with a single camera deployed at the mouth of the volcano's crater during the first year of activity. Analysis of those images indicates that the average lineal extrusion rate decayed approximately logarithmically from about 8 m/d to about 2 m/d (± 2 m/d) from November 2004 through December 2005, and suggests that the extrusion rate fluctuated on time scales of days to weeks. From May 2006 through September 2007, imagery from multiple cameras deployed around the volcano allowed determination of 3-dimensional motion across the dome complex. Analysis of the multi-camera imagery shows spatially differential, but remarkably steady to gradually slowing, motion, from about 1–2 m/d from May through October 2006, to about 0.2–1.0 m/d from May through September 2007. In contrast to the fluctuations in lineal extrusion rate documented during the first year of eruption, dome motion from May 2006 through September 2007 was monotonic (± 0.10 m/d) to gradually slowing on time scales of weeks to months. The ability to measure spatial and temporal rates of motion of the effusing lava dome from oblique terrestrial photographs provided a significant, and sometimes the sole, means of identifying and quantifying dome growth during the eruption, and it demonstrates the utility of using frequent, long-term terrestrial photography to monitor and study volcanic eruptions.

  12. Test Plan for Long-Term Operation of a Ten-Cell High Temperature Electrolysis Stack

    International Nuclear Information System (INIS)

    James E. O'Brien; Carl M. Stoots; J. Stephen Herring

    2008-01-01

    This document defines a test plan for a long-term (2500 Hour) test of a ten-cell high-temperature electrolysis stack to be performed at INL during FY09 under the Nuclear Hydrogen Initiative. This test was originally planned for FY08, but was removed from our work scope as a result of the severe budget cuts in the FY08 NHI Program. The purpose of this test is to evaluate stack performance degradation over a relatively long time period and to attempt to identify some of the degradation mechanisms via post-test examination. This test will be performed using a planar ten-cell Ceramatec stack, with each cell having dimensions of 10 cm x 10 cm. The specific makeup of the stack will be based on the results of a series of shorter duration ten-cell stack tests being performed during FY08, funded by NGNP. This series of tests was aimed at evaluating stack performance with different interconnect materials and coatings and with or without brazed edge rails. The best performing stack from the FY08 series, in which five different interconnect/coating/edge rail combinations were tested, will be selected for the FY09 long-term test described herein

  13. Review of research on simulation engineering in FY2009

    International Nuclear Information System (INIS)

    2011-03-01

    Research on simulation engineering for nuclear applications, based on 'the plan for meeting the mid-term goal of the Japan Atomic Energy Agency', has been performed at Center for Computational Science and e-Systems, Japan Atomic Energy Agency (CCSE/JAEA). CCSE established the committee consisting outside experts and authorities which does research evaluation and advices for the assistance of the research and development. This report summarizes results of the evaluation by the committee on the followings. (1) Research and development on simulation engineering performed at CCSE/JAEA in FY2009. (2) Research and development on simulation engineering performed at CCSE/JAEA in the period of the midterm plan (October 1st, 2005 - March 31st, 2010). (author)

  14. 75 FR 51853 - Notice of Proposed Information Collection Requests: Public Libraries Survey, FY 2011-2013

    Science.gov (United States)

    2010-08-23

    ..., Office of Policy, Planning, Research, and Communication, Institute of Museum and Library Services, 1800 M..., Research, and Communication, Institute of Museum and Library Services, 1800 M Street, NW., 9th Floor... Requests: Public Libraries Survey, FY 2011-2013 AGENCY: Institute of Museum and Library Services, National...

  15. FY 1997 cost savings report

    International Nuclear Information System (INIS)

    Sellards, J.B.

    1998-01-01

    With the end of the cold war, funding for the Environmental Management program increased rapidly as nuclear weapons production facilities were shut down, cleanup responsibilities increased, and facilities were transferred to the cleanup program. As funding for the Environmental Management (EM) program began to level off in response to Administration and Congressional efforts to balance the Federal budget, the program redoubled its efforts to increase efficiency and get more productivity out of every dollar. Cost savings and enhanced performance are an integral pair of Hanford Site operations. FY1997 was the third year of a cost savings program that was initially defined in FY 1995. The definitions and process remained virtually the same as those used in FY 1996

  16. The Beijing HYFORUM 2004 - a lasting success!

    International Nuclear Information System (INIS)

    Winter, C.-J.

    2004-01-01

    'Full text:' HYFORUM 2004 - The International Hydrogen Energy Forum 2004, Clean Energies for the 21st Century was well run. After HYFORUM 2000 in Munich, Germany, it was the second Forum of its kind. Some 600 attendees from all over the world discussed hydrogen and fuel cell matters. The newest R and D results went 'out of the labs, and onto the markets'. The first day, the Chinese Government invited the Forum into the Great Hall of the People and left no doubt on its clear hydrogen and fuel cell commitment for a future cleaner China and an indigenously secured energy supply for the nation via hydrogen and its technologies. 'Olympic Hydrogen', the singular world event in 2008 in Beijing with its outreach to billions of television viewers worldwide, is being planned for serving as an excellent vehicle for the early application of hydrogen supported clean transport, efficient combined heat and power supply via stationary fuel cells, and fuel cells aboard portable electronics such as laptops or television cameras of journalists. The Olympic Games 2008 are going to become a showcase for environmentally and climatically clean national or foreign investments. The HYFORUM 2004 was predominantly devoted to clean fuels in transport. Major European or US automakers served as sponsors and presented their papers. A whole bunch of dissimilar fuel options are still in the R and D pipelines, from pure high pressure or liquefied hydrogen to hydrogen rich compounds made from biomass. The agreement among the automotive industry on THE necessarily one future fuel is not in reach yet. Again, it was emphasized that clean production of hydrogen needs to get much more to the forefront of the agendas of coming HYFORUMs. Clean production either from CO2 sequestered fossil fuels, particularly non-'OPECizable' coal, or from renewable sources. Truly, the hydrogen energy conversion chains back end, utilization of hydrogen, is in good hands. The front end, however, production, storage, and

  17. JUST Vol. 28 No. 2 Aug 2008

    African Journals Online (AJOL)

    ben

    2008-08-02

    Aug 2, 2008 ... operating in fading environments (Hueda and Rod- rigruez, 2004), and ... networks supporting mobile computing (Lee et al.,. 1999). ... The transition diagram of the system analyzed in this report is given in Fig. 1, having N+1 ...

  18. Study on engineering technologies in the Mizunami Underground Research Laboratory (FY 2015). Development of design and construction planning and countermeasure technologies (Contract research)

    International Nuclear Information System (INIS)

    Toguri, Satohito; Kobayashi, Shinji; Tsuji, Masakuni; Yahagi, Ryoji; Yamada, Toshiko; Matsui, Hiroya; Mikake, Shinichiro; Aoyagi, Yoshiaki; Sato, Toshinori

    2017-03-01

    The study on engineering technology in the Mizunami Underground Research Laboratory (MIU) project roughly consists of (1)development of design and construction planning technologies, (2)development of construction technology, (3)development of countermeasure technology, (4)development of technology for security, and (5) development of technologies regarding restoration and mitigating of the excavation effect. So far, the verification of the initial design based on the data obtained during excavation was mainly conducted as a research in the Construction Phase, also the countermeasure technologies to control groundwater inflow were examined as a research in the Operation Phase. In FY2015, as a part of the important issues on the research program, “Development of countermeasure technologies for reducing groundwater inflow” in the Japan Atomic Energy Agency 3rd Midterm Plan, water-tight grouting method has been developed. Grouting methods utilized in the MIU were evaluated and the post-excavation grouting at the -500m Access/Research Gallery-South was planned based on these evaluation results. Also, technology development from the viewpoint of geological disposal was summarized, and information on the alternative method to the grouting method was collected and organized. (author)

  19. South Fork Salmon River Watershed Restoration, 2008-2009 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Reaney, Mark D. [Nez Perce Tribe Department of Fisheries Resource Management

    2009-04-15

    The watershed restoration work elements within the project area, the South Fork Salmon River Watershed, follow the watershed restoration approach adopted by the Nez Perce Tribe Department of Fisheries Resource Management (DFRM) - Watershed Division. The vision of the Nez Perce Tribe DFRM-Watershed Division focuses on protecting, restoring, and enhancing watersheds and treaty resources within the ceded territory of the Nez Perce Tribe under the Treaty of 1855 with the United States Federal Government. The program uses a holistic approach, which encompasses entire watersheds, ridge top to ridge top, emphasizing all cultural aspects and strategies that rely on natural fish production and healthy river ecosystems. The Nez Perce Tribe DFRM-Watershed Division strives towards maximizing historic ecosystem productivity and health for the restoration of anadromous and resident fish populations and the habitat on which all depend on for future generations Originally, this project was funded to create a step/pool stream channel that was appropriate to restore fish passage where the 'Glory Hole Cascade' is currently located at the Stibnite Mine. Due to unforeseen circumstances at the time, the project is unable to move forward as planned and a request for a change in scope of the project and an expansion of the geographic area in which to complete project work was submitted. No additional funds were being requested. The ultimate goal of this project is to work with the holistic, ridge top to ridge top approach to protect and restore the ecological and biological functions of the South Fork Salmon River Watershed to assist in the recovery of threatened and endangered anadromous and resident fish species. FY 2008 Work Elements included two aquatic organism passage (AOP) projects to restore habitat connectivity to two fish-bearing tributaries to the East Fork South Fork Salmon River, Salt and Profile Creeks. The Work Elements also included road survey and assessment

  20. 75 FR 69134 - Submission for OMB Review, Comment Request, Proposed Collection: Public Libraries Survey, FY 2011...

    Science.gov (United States)

    2010-11-10

    ..., Office of Policy, Planning, Research, and Communication, Institute of Museum and Library Services, 1800 M..., Proposed Collection: Public Libraries Survey, FY 2011-2013 AGENCY: Institute of Museum and Library Services.... SUMMARY: The Institute of Museum and Library Services announces the following information collection has...

  1. Photovoltaic Subcontract Program, FY 1990

    Energy Technology Data Exchange (ETDEWEB)

    Summers, K.A. (ed.)

    1991-03-01

    This report summarizes the progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaics Program at the Solar Energy Research Institute (SERI). The SERI subcontracted PV research and development represents most of the subcontracted R D that is funded by the US Department of Energy (DOE) National Photovoltaics Program. This report covers fiscal year (FY) 1990: October 1, 1989 through September 30, 1990. During FY 1990, the SERI PV program started to implement a new DOE subcontract initiative, entitled the Photovoltaic Manufacturing Technology (PVMaT) Project.'' Excluding (PVMaT) because it was in a start-up phase, in FY 1990 there were 54 subcontracts with a total annualized funding of approximately $11.9 million. Approximately two-thirds of those subcontracts were with universities, at a total funding of over $3.3 million. Cost sharing by industry added another $4.3 million to that $11.9 million of SERI PV subcontracted R D. The six technical sections of this report cover the previously ongoing areas of the subcontracted program: the Amorphous Silicon Research Project, Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, and the University Participation Program. Technical summaries of each of the subcontracted programs discuss approaches, major accomplishments in FY 1990, and future research directions. Another section introduces the PVMaT project and reports the progress since its inception in FY 1990. Highlights of technology transfer activities are also reported.

  2. Perceived discrimination, psychological distress, and current smoking status: results from the Behavioral Risk Factor Surveillance System Reactions to Race module, 2004-2008.

    Science.gov (United States)

    Purnell, Jason Q; Peppone, Luke J; Alcaraz, Kassandra; McQueen, Amy; Guido, Joseph J; Carroll, Jennifer K; Shacham, Enbal; Morrow, Gary R

    2012-05-01

    We examined the association between perceived discrimination and smoking status and whether psychological distress mediated this relationship in a large, multiethnic sample. We used 2004 through 2008 data from the Behavioral Risk Factor Surveillance System Reactions to Race module to conduct multivariate logistic regression analyses and tests of mediation examining associations between perceived discrimination in health care and workplace settings, psychological distress, and current smoking status. Regardless of race/ethnicity, perceived discrimination was associated with increased odds of current smoking. Psychological distress was also a significant mediator of the discrimination-smoking association. Our results indicate that individuals who report discriminatory treatment in multiple domains may be more likely to smoke, in part, because of the psychological distress associated with such treatment.

  3. Annual report 2008: ELETROBRAS; Relatorio anual 2008: ELETROBRAS

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This document reports the actives of the ELETROBRAS during the year 2008 related to: electricity market, international activities, strategic planning, financial indicators, business analysis, relationship with investors, energy marketing, operational research, technological development, financial statements, social responsibility and environment

  4. Annual report on the effluent control of low level liquid water in Tokai Works. FY2004

    International Nuclear Information System (INIS)

    Takeishi, Minoru; Miyagawa, Naoto; Watanabe, Hitoshi

    2005-08-01

    This report was written about the effluent control of low level liquid waste in JNC Tokai Works Fiscal Year 2004, from 1st April 2004 to 31th March 2005. In this period, the quantities and concentrations of radioactivity in liquid waste from Tokai Works were under the discharge limits of 'Safety Regulations for the Tokai Reprocessing Plant' and regulations of government. (author)

  5. Testing EGM2008 on Leveling Data from Scandinavia, Adjacent Baltic Areas, and Greenland

    DEFF Research Database (Denmark)

    Strykowski, Gabriel; Forsberg, René

    2010-01-01

    We tested EGM2008 on GPS/leveling data from Scandinavia and adjacent areas. EGM2008 performs at the same level as the best regional geoid model, NKG2004. However, the direct evaluation of EGM2008 is difficult in Greenland because no leveling data are available. Nevertheless, we show on 78 GPS-MSS...

  6. Tanks Focus Area (TFA) FY1999 Midyear Review Report

    International Nuclear Information System (INIS)

    Schlahta, Stephan N.

    1999-01-01

    The purpose of the Tanks Focus Area (TFA) Midyear Review was to improve the quality and responsiveness of TFA technical solutions to identified user needs. This review goal was achieved through executing a multi-phased review approach. The first phase of the midyear review focused on the subset of FY99 work identified by Department of energy users as having continuing benefit in FY00-01. The TFA FY00-02 Technical Responses identified FY99 work that had continued applicability based on the most current set of site user needs. Each TFA FY00-02 Technical Response which included FY work scope was reviewed by the TFA Technical Advisory Group (TAG), in a meeting held in February 1999. Made up of technical experts from across the country, the TAG provides high-quality, short-turnaround, independent technical reviews for the TFA

  7. Impacto de las certificaciones ISO 9001 y BASC en los despachos de exportación definitiva de las agencias de aduanas peruanas: 2004-2008

    OpenAIRE

    Osorio Asencio, Estrella

    2010-01-01

    Objetivo: Realización del análisis del impacto de las certificaciones ISO 9001 y BASC en las agencias de aduanas peruanas, durante el periodo 2004 al 2008. Método: Se analizó la evolución del valor FOB de exportación y se determinó el factor que influye en la decisión para la obtención de la certificación ISO 9001 y BASC. La investigación tuvo un diseño descriptivo correlacional. La población fue de 252 agencias de aduanas, de las cuales se tomó una muestra por estratos con selección intencio...

  8. Used Fuel Disposition in Crystalline Rocks: FY16 Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Y. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hadgu, Teklu [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Kalinina, Elena Arkadievna [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jerden, James L. [Argonne National Lab. (ANL), Argonne, IL (United States); Copple, Jacqueline M. [Argonne National Lab. (ANL), Argonne, IL (United States); Cruse, T. [Argonne National Lab. (ANL), Argonne, IL (United States); Ebert, W. [Argonne National Lab. (ANL), Argonne, IL (United States); Buck, E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Eittman, R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tinnacher, R. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Tournassat, Christophe [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Davis, J. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Viswanathan, H. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Chu, S. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dittrich, T. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Hyman, F. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Karra, S. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Makedonska, N. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Reimus, P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Zavarin, Mavrik [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Joseph, C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-09-21

    The objective of the Crystalline Disposal R&D Work Package is to advance our understanding of long-term disposal of used fuel in crystalline rocks and to develop necessary experimental and computational capabilities to evaluate various disposal concepts in such media. FY16 continued to be a successful year in both experimental and modeling arenas in evaluation of used fuel disposal in crystalline rocks. The work covers a wide range of research topics identified in the R&D plan.

  9. Za Hanou Hynkovou (1921-2004)

    Czech Academy of Sciences Publication Activity Database

    Suchomelová, Marcela

    2004-01-01

    Roč. 91, č. 4 (2004), s. 415-417 ISSN 0009-0794 Institutional research plan: CEZ:AV0Z9058907 Keywords : the personal documentary fund * curriculum vitae Subject RIV: AC - Archeology, Anthropology, Ethnology

  10. Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs. FY 2005 - FY 2050

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2004-05-01

    This report describes a benefits analysis undertaken by EERE to better understand the extent to which the technologies and market improvements funded by its FY 2005 budget request will make energy more affordable, cleaner, and more reliable. It summarizes the results of the analysis, which focused on economic, environmental, and security benefits related to energy. The report identifies specific measures or indicators of estimated benefits for FY 2005.

  11. Safety case plan 2008

    International Nuclear Information System (INIS)

    2008-07-01

    Following the guidelines set forth by the Ministry of Trade and Industry (now Ministry of Employment and Economy) Posiva is preparing to submit the construction license application for a spent fuel repository by the end of the year 2012. The long-term safety section supporting the license application is based on a safety case, which, according to the internationally adopted definition, is a compilation of the evidence, analyses and arguments that quantify and substantiate the safety and the level of expert confidence in the safety of the planned repository. In 2005, Posiva presented a plan to prepare such a safety case. The present report provides a revised plan of the safety case contents mentioned above. The update of the safety case plan takes into account the recommendations made by the Radiation and Nuclear Safety Authority (STUK) about improving the focus and further developing the plan. Accordingly, particular attention is given to the quality management of the safety case work, the management of uncertainties and the scenario methodology. The quality management is based on the ISO 9001:2000 standard process thinking enhanced with special features arising from STUK's YVL Guides. The safety case production process is divided into four main sub-processes. The conceptualisation and methodology sub-process defines the framework for the assessment. The critical data handling and modelling sub-process links Posiva's main technical and scientific activities to the production of the safety case. The assessment sub-process analyses the consequences of the evolution of the disposal system in various scenarios, classified either as part of the expected evolution or as disruptive scenarios. The compliance and confidence sub-process is responsible for final evaluation of compliance of the assessment results with the regulatory criteria and the overall confidence in the safety case. As in the previous safety case plan, the safety case will be based on several reports, but

  12. Results of single borehole hydraulic tests in the Mizunami Underground Research Laboratory project. FY 2012 - FY 2015

    International Nuclear Information System (INIS)

    Onoe, Hironori; Takeuchi, Ryuji

    2016-11-01

    This report summarize the results of the single borehole hydraulic tests of 151 sections carried out at the -300 m Stage and the -500 m Stage of the Mizunami Underground Research Laboratory from FY 2012 to FY 2015. The details of each test (test interval depth, geology, etc.) as well as the interpreted hydraulic parameters and analytical methods used are presented in this report. Furthermore, the previous results of the single borehole hydraulic tests carried out in the Regional Hydrogeological Study Project and the Mizunami Underground Research Laboratory Project before FY 2012 are also summarized in this report. (author)

  13. PEMETAAN KARYA TULIS ILMIAH LPNK: STUDI KASUS LIPI DAN BPPT (2004-2008

    Directory of Open Access Journals (Sweden)

    Yupi Royani

    2013-06-01

    Full Text Available This research aims to determine: the rank of authors of LIPI and BPPT whose articles are mostly cited by other authors, the type of publications, the level of collaboration, the productivity level of authors, the coverage areas, and the topics contained in the scientific work through the subject analysis. The data were obtained from Google Scholar from 2004 to 2008. The collected data were then analyzed by using ‘co-word’ analysis. The ‘co-word’ structure was known after the mapping using bibliometric method. A total of 593 analyzed scientific papers consist of 472 from LIPI and 121 from BPPT. The results show that the highest citation number (100 citations comes from LIPI scientific papers, while BPPT scientific papers are 36 citations. Most types of publication produced by LIPI and BPPT are from journal articles and papers, each of 235 documents (49.79% and 101 documents (21.40% by LIPI and 71 documents (58.68% and 42 documents (34.71% by BPPT. LIPI researcher collaboration level was 0.82 and BPPT was 0.89. The most productive LIPI researcher in writing paper is Danny Hilman Natawidjaya (Geotechnology Research Center with 31 scientific papers, while BPPT is Yusuf Surachman Djajadihardja with 34 scientific papers. The most dominant topic written by LIPI researcher is basic science or pure science i.e. 63.56%, with details: biology 131 documents (27.75% followed by geology 121 documents (25.64%, chemistry 47 documents (9.96% and mathematics 1 document (0.21%. The topic most widely written by BPPT researchers is the field of applied research i.e. 56.19% with the details: environment 33 (27.27%, engineering 27 (22.31%, biotechnology 5 (4.13%, food technology 2 (1.65% and fisheries 1 document (0.83%. The relationship among the topics is shown in the line among the descriptors on each field. More relation lines among descriptors, the closer the relationships among documents.

  14. NREL Energy Storage Projects: FY2013 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Pesaran, A.; Ban, C.; Brooker, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Long, D.; Neubauer, J.; Santhanagopalan, S.; Smith, K.; Tenent, R.; Wood, E.; Han, T.; Hartridge, S.; Shaffer, C. E.

    2014-07-01

    In FY13, DOE funded NREL to make technical contributions to various R&D activities. This report summarizes NREL's R&D projects in FY13 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY13 projects under NREL's Energy Storage R&D program are discussed in depth in this report.

  15. Trends in the Mental Health Act Review Tribunals: a Welsh experience 2004-2008.

    Science.gov (United States)

    Aziz, V M

    2009-10-01

    This study aims at identifying any local trend in the appeal process and to determine if we are complying with the MHA 1983 and the Code of Practice by reviewing all the appeals to Mental Health Review Tribunals in a psychiatric hospital in South Wales for the period from 2004 to 2008. The total numbers of sections and appeals remain steady over the years. Men are slightly more detained than women mainly under Sections 2 and 3 of the MH Act 1983. The main diagnoses for detention were: bipolar affective disorder, schizophrenia and psychosis. 95% of cases had appeals and 5% referrals. A hearing was held in 52% of cases (n=60), the RMO discharged 38% of patients and the patient withdrew appeal in 10% of cases. 95% of cases were British White ethnicity. Single men tended to appeal more than women 68% vs. 32%. There was no observed trend in the result of the appeals and the proportions of appeal discharged by the hearing remained unchanged. The results of the appeals were not associated with gender, ethnicity, marital status, age or the type of section involved. The patients who were previously detained tend to appeal more, i.e. the more number of detentions, the more number of appeals. In only 12% of cases who had the hearings, the appeal was successful and the patients were discharged from their sections. The study shows steady volume of sections and appeals and the appeals are no more likely to result in discharge. The amendments of the Act 2007 also attract an increase in the appeal process especially in relation to the Community Treatment Orders and the Deprivation of Liberty. The use of both the Act and the Mental Capacity Act 2005 will increase workload for all involved practitioners. 2009 Elsevier Ltd and Faculty of Forensic and Legal Medicine.

  16. FY2000 Hanford Technology Deployment Accomplishments Fact Sheets

    International Nuclear Information System (INIS)

    WIBLE, R.A.

    2001-01-01

    Cleaning up the Hanford Site is one of the top priorities for the U. S. Department of Energy. The department is continually looking for ways to expedite cleanup and reduce costs. During Fiscal Year (FY) 2000. Hanford Site staff deployed 24 new technologies, which produced an estimated lifecycle cost savings of 479 million dollars. This is a clear indicator of the impacts new technology has had and will have on the cleanup efforts. The Hanford Site cleanup is focused on the following: Restoring the Columbia River Corridor; Building and operating the tank waste treatment complex to complete the cleanup of highly radioactive tank waste at Hanford; and Transitioning the Central Plateau. Applying innovative science and technology from national laboratories, universities, and private industry is critical to our complex cleanup mission. The 24 new technologies deployed in FY 2000 are significantly higher than our goal of 14 technological deployments. Eleven of these technologies supported restoring the Columbia River Corridor, and seven were involved with the remediation of radioactive tank waste. These deployments produced valuable information to determine the effectiveness of the new technologies in the field and the efficiencies gained over existing cleanup methods. In several cases, the technology deployed presented a solution to a problem where a clear path of remediation had not yet been determined. New and innovative technologies will play a significant role in the cleanup of the Hanford Site and enable remediation to be done more efficiently. Technology is being developed at a staggering pace. This requires excellent communication throughout the scientific and industry arenas. To effect this communication, we have implemented a technology needs process in conjunction with the multi-year work planning process. Through the combination of these two processes, technology developments and deployments address the near-term technology needs and enable us to plan for the

  17. Neutral-beam development plan, FY 1982-1987

    International Nuclear Information System (INIS)

    1981-09-01

    The following chapters are included: (1) status of BNL negative ion source development, (2) source development program plan, (3) status of beam transport and acceleration, (4) accelerator development program plan, (5) neutralizer concepts, (6) neutralization program plan, (7) neutral beam systems, (8) test facilities, (9) program milestones and time schedules, (10) organization and Grumman participation, and (11) funding tables

  18. Exploratory Research and Development Fund, FY 1990. Report on Lawrence Berkeley Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R&D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R&D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicine and radiation biophysics.

  19. Brookhaven National Laboratory Institutional Plan FY2001--FY2005

    Energy Technology Data Exchange (ETDEWEB)

    Davis, S.

    2000-10-01

    Brookhaven National Laboratory is a multidisciplinary laboratory in the Department of Energy National Laboratory system and plays a lead role in the DOE Science and Technology mission. The Laboratory also contributes to the DOE missions in Energy Resources, Environmental Quality, and National Security. Brookhaven strives for excellence in its science research and in facility operations and manages its activities with particular sensitivity to environmental and community issues. The Laboratory's programs are aligned continuously with the goals and objectives of the DOE through an Integrated Planning Process. This Institutional Plan summarizes the portfolio of research and capabilities that will assure success in the Laboratory's mission in the future. It also sets forth BNL strategies for our programs and for management of the Laboratory. The Department of Energy national laboratory system provides extensive capabilities in both world class research expertise and unique facilities that cannot exist without federal support. Through these national resources, which are available to researchers from industry, universities, other government agencies and other nations, the Department advances the energy, environmental, economic and national security well being of the US, provides for the international advancement of science, and educates future scientists and engineers.

  20. [Shippingport Station Decommissioning Project]: FY 1987 annual progress report, October 1, 1986-September 30, 1987

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1987. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedule considerations. 3 refs., 9 figs., 4 tabs

  1. Shippingport Station Decommissioning Project: FY 1988 annual progress report, October 1, 1987--September 30, 1988

    International Nuclear Information System (INIS)

    1989-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1988. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedular considerations. 4 refs., 17 figs., 2 tabs

  2. Summary of NREL's FY13-FY15 Photovoltaic Subprogram

    Energy Technology Data Exchange (ETDEWEB)

    2017-03-31

    In this report, you will find summaries of the completed FY13-FY15 Photovoltaic projects that were funded within NREL. The summaries describe the initial motivation for the project; significant achievements, including publications, intellectual property, and collaborations; and remaining challenges. Among the NREL projects, you will find research of almost every major PV technology - from the next generation of silicon PV to relatively new organic PVs - as well as projects advancing PV module durability and characterization. Each of these projects was designed to support SunShot's goals, putting the United States one step closer to widespread use of low-cost, clean electricity.

  3. 1997 U.S. Department of Energy Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1997-09-01

    With the end of the Cold War and the election of President Clinton, the Department of Energy (DOE) set a new course which began with the publication of its first departmental strategic plan in April 1994. Entitled ``Fueling a Competitive Economy, it provided the framework and shared vision for meeting responsibilities in energy, national security, environmental quality, and science and technology. The strategic plan was the guidepost for the formulation of the Department`s FY 1996, FY 1997, and FY 1998 budgets and was critical to the development of the Department`s Strategic Alignment Initiative, designed to save $1.7 billion over five years. This current plan, which has been significantly improved through a very close consultation process with Congress and customers stakeholders, takes DOE to the next important performance level by being more directly linked to actions and results. It defines a strategic goal for each of the Department`s four business lines and, in the spirit of the Government Performance and Results Act and the National Performance Review, identifies a fifth goal addressing corporate management. Reengineering the business practices, managing for results, being open with neighbors and stakeholders, and ensuring the safety and health of DOE workers and the public are, and will continue to be, among the highest of priorities. Over the coming years, DOE plans to achieve their strategic goals through specific identifiable strategies. Each business line has clear objectives and straightforward ways of defining whether DOE has succeeded in meeting those objectives.

  4. Containment integrity research program plan

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents a plan for research on the question of containment performance in postulated severe accident scenarios. It focuses on the research being performed by the Structural and Seismic Engineering Branch, Division of Engineering, Office of Nuclear Regulatory Research. Summaries of the plans for this work have previously been published in the ''Nuclear Power Plant Severe Accident Research Plan'' (NUREG-0900). This report provides an update to reflect current status. This plan provides a summary of results to date as well as an outline of planned activities and milestones to the contemplated completion of the program in FY 1989

  5. Decontamination and decommissioning activities photobriefing book FY 1999

    International Nuclear Information System (INIS)

    2000-01-01

    The Chicago Pile 5 (CP-5) Reactor, the first reactor built on the Argonne National Laboratory-East site, followed a rich history that had begun in 1942 with Enrico Fermi's original pile built under the west stands at the Stagg Field Stadium of The University of Chicago. CP-5 was a 5-megawatt, heavy water-moderated, enriched uranium-fueled reactor used to produce neutrons for scientific research from 1954--79. The reactor was shut down and defueled in 1979, and placed into a lay-up condition pending funding for decontamination and decommissioning (D and D). In 1990, work was initiated on the D and D of the facility in order to alleviate safety and environmental concerns associated with the site due to the deterioration of the building and its associated support systems. A decision was made in early Fiscal Year (FY) 1999 to direct focus and resources to the completion of the CP-5 Reactor D and D Project. An award of contract was made in December 1998 to Duke Engineering and Services (Marlborough, MA), and a D and D crew was on site in March 1999 to begin work, The project is scheduled to be completed in July 2000. The Laboratory has determined that the building housing the CP-5 facility is surplus to the Laboratory's needs and will be a candidate for demolition. In addition to a photographic chronology of FY 1999 activities at the CP-5 Reactor D and D Project, brief descriptions of other FY 1999 activities and of projects planned for the future are provided in this photobriefing book

  6. Summaries of FY 1988 research in nuclear physics

    International Nuclear Information System (INIS)

    1989-02-01

    This report summarizes the research projects supported by the Division of Nuclear Physics in the Office of High Energy and Nuclear Physics, during FY 1986. This Division is a component of the Office of Energy Research, the basic research branch of the US Department of Energy, and provides about 80% of the funding for nuclear physics research in the United States. The objective of the Nuclear Physics program is to understand the interactions, properties, and structures of nuclei and nuclear matter and to understand the fundamental forces of nature as manifested in atomic nuclei. These summaries are intended to provide a convenient guide for those interested in the research supported by the Division of Nuclear Physics. The nuclear physics research summaries in this document were initially prepared by the investigators, then reviewed and edited by DOE staff. They describe the general character and goals of the research programs, current research efforts, especially significant recent results, and plans for the near future. The research summaries are organized into two groups: research programs at national laboratories and those at universities, with the material arranged alphabetically by institution. The names of all Ph.D.-level personnel who are primarily associated with the work are included. The FY 1988 funding levels are also provided. Included for the first time are activities of the nuclear data program, which was incorporated within nuclear physics in FY 1987. We remind the readers that this compilation is just an overview of the Nuclear Physics program. Primary publications should be used for reference to the work and for a more complete and accurate understanding

  7. DOE Hazardous Waste Remedial Actions Program: Annual report, FY 1986

    International Nuclear Information System (INIS)

    Eyman, L.D.

    1987-05-01

    The activities of HAZWRAP for the past fiscal year were organized into seven principal areas: technical analysis and technology transfer; regulatory analysis; strategic planning;information systems; program administration; technology adaptation; and technology demonstration. The scope, major FY 1986 accomplishments, and future directions for each of these areas are described in the following sections of this report. Listings of reports produced through the SCO are given in Appendixes A and B for the current year and since the program started, respectively

  8. EST Table: FY036659 [KAIKOcDNA[Archive

    Lifescience Database Archive (English)

    Full Text Available FY036659 rbmte13c09 11/12/09 GO hit GO:0047800(cysteamine dioxygenase activity)|GO:...f|XP_974899.1| PREDICTED: similar to 2-aminoethanethiol (cysteamine) dioxygenase [Tribolium castaneum] FY036659 bmte ...

  9. 78 FR 5481 - Quagga Mussel Strategic Planning Meeting

    Science.gov (United States)

    2013-01-25

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-HQ-FHC-2013-N008; 94140-1341-0000-N5] Quagga Mussel Strategic Planning Meeting AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: This notice announces a meeting to gather information for planning an FY13 strategy to...

  10. WLPGA: the World LP Gas Association in Berlin; the WLPGA 2004 Action Plan; change of direction; WLPGA: la WLPGA a Berlin; le Plan d'Actions 2004 de la WLPGA; reorientation

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2004-07-15

    After Bangkok in 2002 and Santiago de Chile in 2003, the World Forum of the World LP Gas Association (WLPGA) is returning to Europe for two and a half days of exhibition and two days of conferences from 29 September to 1 October at the Hotel lnterContinental in Berlin. As a Europe of 25 is now a reality, the Forum will obviously focus on this situation and the prospects for LP Gas in the new group without, however, neglecting the global issues which are why it exists. The WLPGA has a new Managing Director, James Rockall, since 2 August. He previously held the post of Director of Market Development for the Association from july 2003. The 2004 action plan of the World LP Gas Association forms part of the strategic decisions taken at the end of 2001 for the period 2002-2006. Its structure remains identical to that of the previous plan but with the continuous rise in 'the good industrial practices', there is one programme more than in 2003. There is particular emphasis on the programme for developing LP Gas markets in rural areas, at the core of which is the LP Gas Rural Energy Challenge launched 2 years ago in the framework of a partnership with the UNPD. Moreover, the WLPGA contribution to the preparation of the World Energy Outlook of the LEA is testimony to the reinforcement of relations with this agency, and the Association also took part in the World Energy Congress in Sydney. The other programmes are also progressing: GAIN, GLOTEC, without forgetting the preparation of the annual forum and the services provided directly to WLPGA members. Having decided on a change of direction in his career, Emmanuel Chantelot left the WLPGA and the LP Gas industry on 31 July 2004. He should be attending the Members' Dinner at the Berlin Forum. Emmanuel Chantelot has led the World Association for just over 7 years as Managing Director. (authors)

  11. Review of research on simulation engineering in FY2007

    International Nuclear Information System (INIS)

    2009-02-01

    Research on simulation engineering for nuclear applications, based on the plan for meeting the mid-term goal of the Japan Atomic Energy Agency', has been performed at Center for Computational Science and e-Systems, Japan Atomic Energy Agency (CCSE/JAEA). CCSE established the committee consisting outside experts and authorities which does research evaluation and advices for the assistance of the research and development. This report summarizes the result of the evaluation by the committee on the research on simulation engineering performed at CCSE/JAEA in FY2007. (author)

  12. FY2017 Defense Spending Under an Interim Continuing Resolution (CR): In Brief

    Science.gov (United States)

    2016-11-07

    generally applicable rate in Section 101: “Notwithstanding section 101, amounts are provided for ‘Defense Nuclear Facilities Safety Board— Salaries...acquisition community must consider late enactment to be the norm [emphasis in original] rather than the exception and, therefore, plan their...would be capped at 12, instead of the requested 15. If held to the lower FY2016 production rates through January 2017, the Air Force could face a

  13. Prediction of External Corrosion for Steel Cylinders--2004 Report

    Energy Technology Data Exchange (ETDEWEB)

    Schmoyer, RLS

    2004-07-07

    Depleted uranium hexafluoride (UF{sub 6}) is stored in over 60,000 steel cylinders at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee, at the Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky, and at the Portsmouth Gaseous Diffusion Plant (PORTS) in Portsmouth, Ohio. The cylinders range in age from 4 to 53 years. Although when new the cylinders had wall thicknesses specified to within manufacturing tolerances, over the years corrosion has reduced their actual wall thicknesses. The UF{sub 6} Cylinder Project is managed by the United States Department of Energy (DOE) to safely maintain the UF{sub 6} and the cylinders containing it. This report documents activities that address UF{sub 6} Cylinder Project requirements and actions involving forecasting cylinder wall thicknesses. These requirements are delineated in the System Requirements Document (LMES 1997a), and the actions needed to fulfill them are specified in the System Engineering Management Plan (LMES 1997b). The report documents cylinder wall thickness projections based on models fit to ultrasonic thickness (UT) measurement data. UT data is collected at various locations on randomly sampled cylinders. For each cylinder sampled, the minimum UT measurement approximates the actual minimum thickness of the cylinder. Projections of numbers of cylinders expected to fail various thickness criteria are computed from corrosion models relating minimum wall thickness to cylinder age, initial thickness estimates, and cylinder subpopulations defined in terms of plant site, yard, top or bottom storage positions, nominal thickness, etc. In this report, UT data collected during FY03 is combined with UT data collected in earlier years (FY94-FY02), and all of the data is inventoried chronologically and by various subpopulations. The UT data is used to fit models of maximum pit depth and minimum thickness, and the fitted models are used to extrapolate minimum thickness estimates into the future and in

  14. Perceived Discrimination, Psychological Distress, and Current Smoking Status: Results From the Behavioral Risk Factor Surveillance System Reactions to Race Module, 20042008

    Science.gov (United States)

    Peppone, Luke J.; Alcaraz, Kassandra; McQueen, Amy; Guido, Joseph J.; Carroll, Jennifer K.; Shacham, Enbal; Morrow, Gary R.

    2012-01-01

    Objectives. We examined the association between perceived discrimination and smoking status and whether psychological distress mediated this relationship in a large, multiethnic sample. Methods. We used 2004 through 2008 data from the Behavioral Risk Factor Surveillance System Reactions to Race module to conduct multivariate logistic regression analyses and tests of mediation examining associations between perceived discrimination in health care and workplace settings, psychological distress, and current smoking status. Results. Regardless of race/ethnicity, perceived discrimination was associated with increased odds of current smoking. Psychological distress was also a significant mediator of the discrimination–smoking association. Conclusions. Our results indicate that individuals who report discriminatory treatment in multiple domains may be more likely to smoke, in part, because of the psychological distress associated with such treatment. PMID:22420821

  15. Annual report of nuclear technology and education center. April 1, 2003 - March 31, 2004

    International Nuclear Information System (INIS)

    2004-10-01

    This report summarizes the activities of Nuclear Technology and Education Center (NuTEC) is Japan Atomic Energy Research Institute in FY 2003. It includes the domestic educational activities and the international training activities mainly for Asia-Pacific region as well as the activities of the research and the development for training courses and administrative aspects. The courses yet carried out in Tokyo Education Center were begun to operate in the facilities of the Tokai Research Establishment. Aiming at carrying out training activities more effectively and efficiently, the training division system related to the training fields have started together with that. Most of the scheduled training courses for the FY2003 have been carried out as planned and the total number of the trainees completing the courses was 1,311. The building of the Tokyo Education Center was demolished and removed after the decontamination, decommissioning procedures. The land was returned to the land owner by the end of FY 2003. In addition to these activities, research and development for the improvement of education and training were carried out. (author)

  16. The NASA Electronic Parts and Packaging (NEPP) Program: Roadmap for FY15 and Beyond and Recent Radiation Highlights

    Science.gov (United States)

    LaBel, Kenneth A.; Sampson, Michael J.

    2015-01-01

    This presentation is a NASA Electronic Parts and Packaging (NEPP) Program: Roadmap for FY15 and Beyond. This roadmap provides a snapshot for current plans and collaborations on testing and evaluation of electronics as well as a discussion of the technology selection approach.

  17. Environmental management compliance reengineering project, FY 1997 report

    International Nuclear Information System (INIS)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL''s environment, safety, and health requirements and milestone commitments. Compliance reengineer''s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL

  18. Environmental management compliance reengineering project, FY 1997 report

    Energy Technology Data Exchange (ETDEWEB)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

  19. Nuclear Regulatory Commission Human Factors Program Plan. Revision 2

    International Nuclear Information System (INIS)

    1986-04-01

    This document is the Second Annual Revision to the NRC Human Factors Program Plan. The first edition was published in August 1983. Revision 1 was published in July of 1984. Purpose of the NRC Human Factors Program is to ensure that proper consideration is given to human factors in the design and operation of nuclear power plants. This document describes the plans of the Office of Nuclear Reactor Regulation to address high priority human factors concerns of importance to reactor safety in FY 1986 and FY 1987. Revision 2 of the plan incorporates recent Commission decisions and policies bearing on the human factors aspects of reactor safety regulation. With a few exceptions, the principal changes from prior editions reflect a shift from developing new requirements to staff evaluation of industry progress in resolving human factors issues. The plan addresses seven major program elements: (1) Training, (2) Licensing Examinations, (3) Procedures, (4) Man-Machine Interface, (5) Staffing and Qualifications, (6) Management and Organization, and (7) Human Performance

  20. The SPEAR3 Vacuum System - An Analysis of the First Two Years of Operation (2004 and 2005)

    International Nuclear Information System (INIS)

    Armenta, R.

    2005-01-01

    SPEAR 3, a synchrotron radiation source at the Stanford Linear Accelerator Center, has been in operation for the past two years. SPEAR 3 was designed to achieve high beam lifetimes while operating at a higher current level than previously achieved with SPEAR 2. Maintaining high electron beam lifetimes within the ring allows users to perform their experiments with a consistent supply of high current synchrotron radiation. The purpose of this analysis is to evaluate the SPEAR 3 vacuum system's performance during the 2004 and 2005 runs while considering methods to optimize and improve vacuum system conditioning, especially within the pumping system, so that a recommended plan of action can be created for the FY 2006 run. Monitoring the dynamics of the electron beam within the ring can be a difficult task. Pressure data obtained from the gages attached to pumps, temperature data obtained from thermocouples located at various locations around the ring, and beam lifetime projections help to provide some indication of the health of the electron beam, but the true conditions within the beam chamber can only be extrapolated. Data collected from sensors (gauges, thermocouples, etc.) located around the ring can be viewed and extracted from a program created at the Stanford Synchrotron Radiation Laboratory (SSRL) called Historyplot. Manipulation and analysis of data was performed with the commercially available programs Matlab and Excel. The data showed that the beam lifetimes in 2005 were much greater than they were in 2004, but it did not provide a clear indication as to why this occurred. One variable of major importance between the 2004 and 2005 runs is the Titanium Sublimation Pump (TSP) flash frequency (flashing is the process in which Titanium from filaments within the pump is sublimated onto the wall surfaces of the pump, where it removes gas molecules from the system by chemisorption). The data indicated that pressures in 2005 could have been lower, based on a

  1. Enhanced surveillance program FY97 accomplishments. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    Mauzy, A. [ed.; Laake, B. [comp.

    1997-10-01

    This annual report is one volume of the Enhanced Surveillance Program (ESP) FY97 Accomplishments. The complete accomplishments report consists of 11 volumes. Volume 1 includes an ESP overview and a summary of selected unclassified FY97 program highlights. Volume 1 specifically targets a general audience, reflecting about half of the tasks conducted in FY97 and emphasizing key program accomplishments and contributions. The remaining volumes of the accomplishments report are classified, organized by program focus area, and present in technical detail the progress achieved in each of the 104 FY97 program tasks. Focus areas are as follows: pits; high explosives; organics; dynamics; diagnostics; systems; secondaries; nonnuclear materials; nonnuclear components; and Surveillance Test Program upgrades.

  2. FY 2015 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  3. FY 2016 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  4. Federal Research and Development Funding: FY2014

    Science.gov (United States)

    2014-02-19

    1.12 billion for FY2014. The FY2014 request proposed $155 million to replace the agency’s Southeast Poultry Disease Research Laboratory in Athens...formula funding, and special grants. 94 U.S. Department of Agriculture, “Statement by Thomas J

  5. FY 1992 report on the Coal Liquefaction Committee; 1992 nendo sekitan ekika iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    The paper reported activities of the Coal Liquefaction Committee in FY 1992. In the 1st committee meeting, report/discussion were made of the summary of the FY 1992 R and D plan on the bituminous coal liquefaction, brown coal liquefaction and the common/basic technology. Further, the following were reported as topics: results of the operation by bituminous coal liquefaction PSU and small equipment, state of arrangement of the results of the brown coal liquefaction project, making of the basic policy for development of the common/basic technology, construction of package of coal liquefaction technology. In the 2nd committee meeting, the summary of the results of the FY 1992 R and D was reported/discussed. As to the development of bituminous coal liquefaction technology, study using pilot plant and support study were reported. Concerning the development of brown coal liquefaction technology, study using a 50t/d pilot plant and complementary study of operation. Relating to the development of the common/basic technology, trial manufacture/development of plant equipment/materials, survey of selection of coal kind, etc. The paper also reported a scheme on the evaluation of efficiency of the brown coal liquefaction process. (NEDO)

  6. FY97 ICCS prototype specification

    International Nuclear Information System (INIS)

    Woodruff, J.

    1997-01-01

    The ICCS software team will implement and test two iterations of their software product during FY97. This document specifies the products to be delivered in that first prototype and projects the direction that the second prototype will take. Detailed specification of the later iteration will be written when the results of the first iteration are complete. The selection of frameworks to be implemented early is made on a basis of risk analysis from the point of view of future development in the ICCS project. The prototype will address risks in integration of object- oriented components, in refining our development process, and in emulation testing for FEP devices. This document is a specification that identifies products and processes to undertake for resolving these risks. The goals of this activity are to exercise our development process at a modest scale and to probe our architecture plan for fundamental limits and failure modes. The product of the iterations will be the framework software which will be useful in future ICCS code. Thus the FY97 products are intended for internal usage by the ICCS team and for demonstration to the FEP software developers of the strategy for integrating supervisory software with FEP computers. This will be the first of several expected iterations of the software development process and the performance measurements that ICCS will demonstrate, intended to support confidence in our ability to meet project RAM goals. The design of the application software is being carried out in a separate WBS 1.5.2 activity. The design activity has as its FY97 product a series of Software Design Documents that will specify the functionality of the controls software of ICCS. During the testing of this year''s prototypes, the application functionality needed for test will be provided by sample maintenance controls. These are early precursors of controls that can be used for low level device control. Since the devices under test will be represented by

  7. FY 2001 Hanford Waste Management Strategic Plan

    International Nuclear Information System (INIS)

    COLLINS, M.S.

    2001-01-01

    We are pleased to present the 2001 Hanford Waste Management Program Strategic Plan. This plan supports the newly developed U. S. Department of Energy Site outcomes strategy. The 2001 Plan reflects current and projected needs for Waste Management Program services in support of Hanford Site cleanup, and updates the objectives and actions using new waste stream oriented logic for the strategic goals: (1) waste treatment/processing, storage, and disposal; (2) interfaces; and (3) program excellence. Overall direction for the Program is provided by the Waste Management Division, Office of the Assistant Manager for Environmental Restoration and Waste Management, U. S. Department of Energy, Richland Operations Office. Fluor Hanford, Inc. is the operating contractor for the program. This Plan documents proactive strategies for planning and budgeting, with a major focus on helping meet regulatory commitments in a timely and efficient manner and concurrently assisting us in completing programs cheaper, better and quicker. Newly developed waste stream oriented logic was incorporated to clarify Site outcomes. External drivers, technology inputs, treatment/processing, storage and disposal strategies, and stream specific strategies are included for the six major waste types addressed in this Plan (low-level waste, mixed low-level waste, contact-handled transuranic waste, remote-handled transuranic waste, liquid waste, and cesium/strontium capsules). The key elements of the strategy are identification and quantification of the needs for waste management services, assessment of capabilities, and development of cost-effective actions to meet the needs and to continuously improve performance. Accomplishment of specific actions as set forth in the Plan depends on continued availability of the required resources and funding. The primary objectives of Plan are: (1) enhance the Waste Management Program to improve flexibility, become more holistic especially by implementing new

  8. Office of Inspector General fiscal year 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  9. Accelerator/Experiment operations - FY 2006

    Energy Technology Data Exchange (ETDEWEB)

    Brice, S.; Conrad, J.; Denisov, D.; Ginther, G.; Holmes, S.; James, C.; Lee, W.; Louis, W.; Moore, C.; Plunkett, R.; Raja, R.; /Fermilab

    2006-10-01

    This Technical Memorandum (TM) summarizes the Fermilab accelerator and experiment operations for FY 2006. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2006 Run II at the Tevatron Collider, the MiniBooNE experiments running in the Booster Neutrino Beam in neutrino and antineutrino modes, MINOS using the Main Injector Neutrino Beam (NuMI), and SY 120 activities.

  10. Annual report of JMTR, FY2006. April 1, 2006 - March 31, 2007

    International Nuclear Information System (INIS)

    2008-03-01

    During the FY2006 (April 2006 to March 2007), the Japan Materials Testing Reactor (JMTR) was operated for three operation cycles from 162nd cycle to 165th cycle. Various irradiation tests and post-irradiation examinations (PIEs) were performed for studies on Irradiation Assisted Stress Corrosion Cracking (IASCC) of light-water-reactor internals, development of the fusion blanket, basic materials researches, radioisotope production, and so on. The operation was stopped by 165th cycle according to schedule. And maintenance work and preservation work of the facilities has been started for the refurbishment of the JMTR. Renewal of equipments and aging management of equipments and reactor facilities were carried out according to long-term maintenance plan which was based on periodical evaluation related to maintenance and safety management of reactor facilities. Regarding development on irradiation techniques, the in-situ irradiation tests using load control unit which was developed for in-pile SCC tests of IASCC studies were finished. At the hot laboratory, PIEs for the Radiation Induced Surface Activation (RISA) capsule were performed with the X-ray diffract meter which was moved from the Nuclear Science Research Institute. Under the Arrangement for the Implementation of Cooperative Research Program between the JAEA and the Korea Atomic Energy Research Institute (KAERI), mutual exchange was conducted for information exchange of irradiation and PIE techniques. As for the refurbishment and restart of JMTR, contents of the midterm targets were changed according to unofficial notification of budget in FY2007 by the Ministry of Finance. And it was officially decided to start refurbishment work at FY2007 for restart of the JMTR in FY2011. (author)

  11. Progress of work in the FY1993 on the subject-2. Study on the validation of assessment models used in an environmental consequence assessment methodology for nuclear accidents

    International Nuclear Information System (INIS)

    1994-01-01

    Concerning the above subject, in this report, the progress of work in FY 1993 and the working plan for the remaining period are described. The summaries of the progress are given in the Appendix. This is the copy of the report presented at the second steering conference. The progress of work carried out by JAERI in FY 1993 were the analysis of data handed over from CHECIR, and the development of data bases. In the remaining period of FY1993, Dr. Ponomarev of CHECIR will visit JAERI for 15 days in March, 1994. The various kinds of data which must be prepared for the implementation of the above subject, and the data that have been handed over so far from CHECIR are shown. The analysis of the site-specific input data for OSCAAR such as source terms, meteorological data and topographical data, and the data for being compared with the model prediction such as the spectrometry analysis of soil samples in each layer, γ ray dose rate and others are described. The data which were installed into the data base management system are shown. The working plan for FY 1994 on the above subject is added. (K.I.)

  12. Proceedings of the FNCA 2004 workshop on application of electron accelerator. EB treatment of flue gases

    International Nuclear Information System (INIS)

    Yoshii, Fumio; Kume, Tamikazu

    2005-06-01

    'Forum for Nuclear Cooperation in Asia (FNCA) Workshop on Application of Electron Accelerator' was sponsored by the Ministry of Education, Culture, Sports, Science and Technology (MEXT). The 2004 workshop was jointly organized by China Atomic Energy Authority (CAEA), Institute of Modern Physics/Chinese Academy of Sciences(IMP-CAS) and Japan Atomic Energy Research Institute (JAERI). It was held at Prime Hotel, Beijing, China from 6 to 10 September 2004. The Workshop was attended by 28 experts on application of electron accelerator from each of the participating countries, i.e., China, Indonesia, Korea, Malaysia, The Philippines, Thailand and Vietnam, and 10 participants from Japan. On the first day, a National Executive Management Seminar on Application of Electron Accelerator was held and attended by 67 participants. Total of 20 papers including Seminar lectures, invited papers on flue gas treatment by electron beam, and country reports on EB irradiation system were presented. The major areas of interest of FNCA member states for cooperation were identified for application of low energy electron accelerator as liquid (natural polymer, wastewater), solid (hydrogel, thin film) and gases (flue gas). Based on the proposal from the participating countries, discussions were carried out to re-formulate the work plan of the project for three years until FY 2005. It was agreed the FNCA 2005 workshop on EB treatment of wastewater will be held in Korea. All manuscripts submitted by every speaker were included in the proceedings. The 20 of the presented papers are indexed individually. (J.P.N.)

  13. Cementitious Barriers Partnership FY2013 End-Year Report

    Energy Technology Data Exchange (ETDEWEB)

    Flach, G. P. [Savannah River Site (SRS), Aiken, SC (United States); Langton, C. A. [Savannah River Site (SRS), Aiken, SC (United States); Burns, H. H. [Savannah River Site (SRS), Aiken, SC (United States); Smith, F. G. [Savannah River Site (SRS), Aiken, SC (United States); Kosson, D. S. [Vanderbilt University, School of Engineering, Nashville, TN (United States); Brown, K. G. [Vanderbilt University, School of Engineering, Nashville, TN (United States); Samson, E. [SIMCO Technologies, Inc., Quebec (Canada); Meeussen, J. C.L. [Nuclear Research and Consultancy Group (NRG), Petten (The Netherlands); van der Sloot, H. A. [Hans van der Sloot Consultancy, Langedijk (The Netherlands); Garboczi, E. J. [Materials & Construction Research Division, National Institute of Standards and Technology, Gaithersburg, MD (United States)

    2013-11-01

    In FY2013, the Cementitious Barriers Partnership (CBP) demonstrated continued tangible progress toward fulfilling the objective of developing a set of software tools to improve understanding and prediction of the long-term structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. In November 2012, the CBP released “Version 1.0” of the CBP Software Toolbox, a suite of software for simulating reactive transport in cementitious materials and important degradation phenomena. In addition, the CBP completed development of new software for the “Version 2.0” Toolbox to be released in early FY2014 and demonstrated use of the Version 1.0 Toolbox on DOE applications. The current primary software components in both Versions 1.0 and 2.0 are LeachXS/ORCHESTRA, STADIUM, and a GoldSim interface for probabilistic analysis of selected degradation scenarios. The CBP Software Toolbox Version 1.0 supports analysis of external sulfate attack (including damage mechanics), carbonation, and primary constituent leaching. Version 2.0 includes the additional analysis of chloride attack and dual regime flow and contaminant migration in fractured and non-fractured cementitious material. The LeachXS component embodies an extensive material property measurements database along with chemical speciation and reactive mass transport simulation cases with emphasis on leaching of major, trace and radionuclide constituents from cementitious materials used in DOE facilities, such as Saltstone (Savannah River) and Cast Stone (Hanford), tank closure grouts, and barrier concretes. STADIUM focuses on the physical and structural service life of materials and components based on chemical speciation and reactive mass transport of major cement constituents and aggressive species (e.g., chloride, sulfate, etc.). THAMES is a planned future CBP Toolbox component focused on simulation of the microstructure of cementitious materials and calculation of resultant

  14. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  15. SOLID WASTE INTEGRATED FORECAST TECHNICAL (SWIFT) REPORT FY2003 THRU FY2046 VERSION 2003.1 VOLUME 2 [SEC 1 & 2

    Energy Technology Data Exchange (ETDEWEB)

    BARCOT, R.A.

    2003-12-01

    This report includes data requested on September 10, 2002 and includes radioactive solid waste forecasting updates through December 31, 2002. The FY2003.0 request is the primary forecast for fiscal year FY 2003.

  16. Study of the Spanish R and D and I Plan 2004-2007 in energy

    International Nuclear Information System (INIS)

    Guerrero-Lemus, Ricardo; Diaz-Herrera, Bruno; Martinez-Duart, Jose Manuel

    2009-01-01

    This paper aims to analyze the public funds transferred to energy projects granted by the Department of Research in the frame of the Spanish Scientific Research, Development and Technological Innovation (R and D and I) Plan 2004-2007. The subjects of the projects granted for R and D activities in incipient technologies and the thematic priorities in energy research covered by the annual calls for proposals are analyzed. In addition, the amount of funds transferred to R and D in energy compared to the rest of research activities promoted by the Spanish Government, the territorial distribution of the research centres granted, the distribution of funds in relation to the technologies granted and the Spanish research centres more active in the diverse energy research areas are presented.

  17. 75 FR 33323 - Notice of Availability: Notice of HUD's Fiscal Year (FY) 2010 Notice of Funding Availability...

    Science.gov (United States)

    2010-06-11

    ... Fair Housing; (4) Capacity Building and Knowledge Sharing; (5) Using Housing as a Platform for Improving Other Outcomes; and (6) Expanding Cross-Cutting Policy Knowledge. Detailed information on HUD's Strategic Plan for FY2010-2015 is available at: http://portal.hud.gov/portal/page/portal/HUD/program_offices...

  18. Shippingport Station Decommissioning Project: FY 1986 annual progress report, October 1, 1985 through September 30, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1986. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedule considerations. 9 refs., 4 figs., 3 tabs

  19. A study to analyze IAEA planning of 2004-2005 programme and to establish cooperation directions with the IAEA

    International Nuclear Information System (INIS)

    Oh, K. B.; Lee, K. S.; Lee, B. W.; Ko, H. S.; Ryu, J. S.; Lee, T. J.; Kim, M. R.

    2003-07-01

    The objective of this study is to utilize the IAEA effectively through reflecting Korea's opinion fully for the planning of the Agency's 2004∼2005 Programme. This study first analyzed the current status of the IAEA Programme and Budget and reviewed the issues relevant to Korea. Second, this study assessed the IAEA 2004∼2005 Programme and drew up Korea's opinion for it. The official document including the opinions was submitted to the Secretariat. In reviewing the Programme, this study considered the strengths of Korea related to the Programme. Also some projects and CRPs, which can be lead by Korea, were proposed. The IAEA 2004∼2005 Programme reflected well the technical and social changes and its structure seems to be proper. The budget was proposed to be increased over 10%, violating the zero-real growth principle. This seems to be inevitable considering the increase of safeguards activities. However, there should be prepared some measures to avoid rapid increase of the burdens of the Member States. In the process of the planning of the IAEA 2004∼2005 Programme, the following points should be emphasized. First, SMR activities should be given a high priority considering the high interests of developing countries and be set up as a separate project as in the 2002∼2003 Programme. Second, more budget should be allocated for Project A.4.04(Support for demonstration of nuclear seawater desalination), considering the highest priority of the project in Program A. Third, it's better to change the title of Subprogram C.3 to 'Nuclear knowledge Preservation' to stick to the original rationale of the subprogram. There is a need for further activities such as establishing and implementing the concept of international nuclear school based on the result of the feasibility study done in 2002∼2003. Fourth, further activities needs to be added to the Project D.2.03 for the efficient conversion to high density, low enriched uranium in Member States; for instance, review

  20. Oak Ridge National Laboratory Institutional Plan, FY 1997--FY 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    Three major initiatives are described, which are proposed to strengthen ORNL`s ability to support the missions of the Department: neutron science, functional genomics, and distributed computing at teraflop speeds. The laboratory missions, strategic plan, scientific and technical programs, enterprise activities, laboratory operations, and resource projections are also described.

  1. Annual Progress Report FY-82. Volume I.

    Science.gov (United States)

    1982-01-01

    Comparison of Binaural Versus 316 Monaural Amplification. (FY-81PI) 2535 Development of Method for Generating 318 Individualized Aural Rehabilitation...Oncology Group. 428 (FY-74 I ) 4116 The Evaluation of Petal Systolic Time Intervals 429 and Beat interval Variation in Fetal heart Rate as Early

  2. Strategic planning applied to quality in asthma management for children.

    Science.gov (United States)

    Goonan, K J; Healy, J M; Jordan, H S; Zazzali, J L; Horowitz, M

    1993-01-01

    This strategic plan translates the HCHP vision statement into a working plan for one major clinical condition--asthma in children. It is a working plan for clinicians and managers across specialties and levels. The results of the projects will improve in a measurable way significant clinical practice and outcomes, in keeping with the FY 1993 strategic goals.

  3. FY 1991 report on the Coal Gasification Committee; 1991 nendo sekitan gasuka iinkai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    The paper reported activities of the Coal Gasification Committee, gasification power generation section and gasification technology section in FY 1991. The 1st Coal Gasification Committee Meeting was held on July 16,1991, and report/discussion were made about an outline of the FY 1991 research plan on the development of coal gasification technology. The 2nd Meeting was held on March 12, 1992, and report/discussion were made about activities of each section meeting and the progress of the development of coal gasification technology. In the section meeting of coal gasification power generation, report/discussion were made about the progress and study object of the development of entrained bed coal gasification power plant and support study for the development of the plant. In the 1st section meeting of coal gasification technology, as to the developmental plan on coal utilization hydrogen production technology, report/discussion were made about design/construction/operational study of pilot plant and support study for pilot plant (study using small equipment, study of trial manufacture of plant use equipment/materials). In the 2nd section meeting, report/discussion were made about the results of the development of coal utilization hydrogen production technology. (NEDO)

  4. NCPV FY 1998 Annual Report

    International Nuclear Information System (INIS)

    McConnell, R. D.; Hansen, A.

    1999-01-01

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the National Center for Photovoltaics (NCPV) from October 1, 1997 through September 30, 1998 (FY 1998). The NCPV is part of the U.S. Department of Energy's (DOE's) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996-2000. The mission of the DOE National Photovoltaics Program is to make PV a significant part of the domestic economy--as an industry and as an energy resource. The two primary goals of the national program are to (1) maintain the U.S. industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NCPV provides leadership and support to the national program toward achieving its mission and goals

  5. Optimizing Federal Fleet Vehicle Acquisitions: An Eleven-Agency FY 2012 Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Singer, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Daley, R. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-02-01

    This report focuses on the National Renewable Energy Laboratory's (NREL) fiscal year (FY) 2012 effort that used the NREL Optimal Vehicle Acquisition (NOVA) analysis to identify optimal vehicle acquisition recommendations for eleven diverse federal agencies. Results of the study show that by following a vehicle acquisition plan that maximizes the reduction in greenhouse gas (GHG) emissions, significant progress is also made toward the mandated complementary goals of acquiring alternative fuel vehicles, petroleum use reduction, and alternative fuel use increase.

  6. Finansowanie leczenia lekami biologicznymi chorych na reumatoidalne i młodzieńcze idiopatyczne zapalenia stawów w ramach programów zdrowotnych NFZ w latach 20042008

    Directory of Open Access Journals (Sweden)

    Andrzej Śliwczyński

    2010-02-01

    Full Text Available Celem pracy była ocena realizacji obowiązujących w Polscew latach 20042008 programów leczenia lekami biologicznymichorych na reumatoidalne i młodzieńcze idiopatyczne zapaleniastawów. Leczenie jest prowadzone przez 81 ośrodków rozmieszczonychrównomiernie w całym kraju. W tym okresie leczonołącznie 8160 chorych. W 2008 r. leczonych było 2282 chorych, costanowi około 2% wszystkich chorych na reumatoidalne zapaleniestawów; 72% z nich stanowiły kobiety, najczęściej w wieku45–55 lat. Lekiem najczęściej stosowanym był etanercept, rzadziejinfliksymab, bardzo rzadko adalimumab i rituksymab. Pieniądzeprzeznaczane przez NFZ na ten rodzaj leczenia nie sąwykorzystywane w pełni, w 2008 r. nie wykorzystano 13,5%.W podsumowaniu podkreślono, że należy zwiększyć liczbę leczonychchorych poprzez poprawienie wykorzystania przeznaczanychnakładów, a następnie ich zwiększenie.

  7. Technical plan for nondestructive examination technology development

    International Nuclear Information System (INIS)

    Anderson, B.C.

    1982-12-01

    This report provides a description of the development of the nondestructive examination (NDE) equipment to be used in the Stored Waste Examination Pilot Plant (SWEPP) for certifying transuranic (TRU) waste for shipment to the Waste Isolation Pilot Plant (WIPP). NDE equipment is being developed for waste identification and container integrity. Real-time x-ray radiography is the basic method being used for waste identification. Acoustic (ultrasonic) testing is being used to obtain measurements to verify container integrity. This report describes the decisions made to date, the decisions to be made, and the activities planned for FY 1983 through FY 1985

  8. Comet P/2004 F3 (NEAT)

    Czech Academy of Sciences Publication Activity Database

    Tichá, J.; Tichý, M.; Kušnirák, Peter

    -, č. 8313 (2004), s. 1 ISSN 0081-0304 R&D Projects: GA AV ČR IAA3003204 Institutional research plan: CEZ:AV0Z1003909 Keywords : comet * astrometry Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  9. Využití vyšší nadmořské výšky v OH cyklu 2004-2008 (na příkladu veslování)

    OpenAIRE

    Knapková, Miroslava

    2010-01-01

    Title: The use of altitude training in Olympic cycle 2004-2008 (in the example of rowing) Aim: The operational objective of this work is to provide a summary of selected published information on the issue of altitude training, and its use in rowing. The main aim of this work will be the practical verification of the theory of recovery training at higher altitude, focusing on the example of rowing through the evaluation of biochemical analysis. Another aim will be to determine whether training...

  10. Summary of FY 17 Assessments Sandia National Laboratories: Evaluation of FY16 SNL FCT M2 Milestone Deliverables

    Energy Technology Data Exchange (ETDEWEB)

    Appel, Gordon John

    2017-03-01

    This report is the milestone deliverable M4FT-17SN111102091 “Summary of Assessments Performed FY17 by SNL QA POC” for work package FT-17SN11110209 titled “Quality Assurance – SNL”. This report summarizes the FY17 assessment performed on Fuel Cycle Technologies / Spent Fuel and Waste Disposition efforts.

  11. Results of dose control and measurement plans applied for SPEAR3 commissioning year (FY04)

    Energy Technology Data Exchange (ETDEWEB)

    Khater, Hesham [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States)]. E-mail: khater1@llnl.gov; Liu, James [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States); Prinz, Alyssa [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States); Allan, Jim [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States); Rokni, Sayed [Radiation Protection Department, Stanford Linear Accelerator Center (SLAC), 2575 Sand Hill Road, Menlo Park, CA 94025 (United States)

    2006-12-15

    Dose control and measurement plans for the SPEAR3 Booster and storage ring have taken place during the SPEAR3 commissioning. The initial commissioning period (SPEAR3 start-up) covered the time period from the beginning of November 2003 to the early part of March 2004. The period from the beginning of March to the beginning of August 2004 has been mostly dedicated to the scientific program. The initial commissioning period was characterized with frequent injection and significantly higher losses. In comparison, the scientific program period was characterized with more stable beam operation with limited number of injections per day and lower beam losses. Three types of dose measurements, passive, active and special measurements, were implemented around the SPEAR3 Booster and storage ring. Based on the expected radiation hazards, several dose control measures were adopted at several stages of the commissioning. In the early stages of commissioning, areas within 4.5 m from the walls of the Booster and storage ring were designated as radiation areas (RA). Areas outside RA were classified as radiologically controlled area (RCA). Access to these areas required less training than the RA. A monthly review of the accelerator operation conditions and radiation measurement results were used to determine the changes needed for the RA classification status and associated dose control measures.

  12. A Year of Exceptional Achievements FY 2008

    International Nuclear Information System (INIS)

    Devore, L.; Chrzanowski, P.

    2008-01-01

    2008 highlights: (1) Stockpile Stewardship and Complex Transformation - LLNL achieved scientific breakthroughs that explain some of the key 'unknowns' in nuclear weapons performance and are critical to developing the predictive science needed to ensure the safety, reliability, and security of the U.S. nuclear deterrent without nuclear testing. In addition, the National Ignition Facility (NIF) passed 99 percent completion, an LLNL supercomputer simulation won the 2007 Gordon Bell Prize, and a significant fraction of our inventory of special nuclear material was shipped to other sites in support of complex transformation. (2) National and Global Security - Laboratory researchers delivered insights, technologies, and operational capabilities that are helping to ensure national security and global stability. Of particular note, they developed advanced detection instruments that provide increased speed, accuracy, specificity, and resolution for identifying and characterizing biological, chemical, nuclear, and high-explosive threats. (3) Exceptional Science and Technology - The Laboratory continued its tradition of scientific excellence and technical innovation. LLNL scientists made significant contributions to Nobel Prize-winning work on climate change. LLNL also received three R and D 100 awards and six Nanotech 50 awards, and dozens of Laboratory scientists and engineers were recognized with professional awards. These honors provide valuable confirmation that peers and outside experts recognize the quality of our staff and our work. (4) Enhanced Business and Operations - A major thrust under LLNS is to make the Laboratory more efficient and cost competitive. We achieved roughly $75 million in cost savings for support activities through organizational changes, consolidation of services, improved governance structures and work processes, technology upgrades, and systems shared with Los Alamos National Laboratory. We realized nonlabor cost savings of $23 million. Severe

  13. A Year of Exceptional Achievements FY 2008

    Energy Technology Data Exchange (ETDEWEB)

    devore, L; Chrzanowski, P

    2008-11-06

    2008 highlights: (1) Stockpile Stewardship and Complex Transformation - LLNL achieved scientific breakthroughs that explain some of the key 'unknowns' in nuclear weapons performance and are critical to developing the predictive science needed to ensure the safety, reliability, and security of the U.S. nuclear deterrent without nuclear testing. In addition, the National Ignition Facility (NIF) passed 99 percent completion, an LLNL supercomputer simulation won the 2007 Gordon Bell Prize, and a significant fraction of our inventory of special nuclear material was shipped to other sites in support of complex transformation. (2) National and Global Security - Laboratory researchers delivered insights, technologies, and operational capabilities that are helping to ensure national security and global stability. Of particular note, they developed advanced detection instruments that provide increased speed, accuracy, specificity, and resolution for identifying and characterizing biological, chemical, nuclear, and high-explosive threats. (3) Exceptional Science and Technology - The Laboratory continued its tradition of scientific excellence and technical innovation. LLNL scientists made significant contributions to Nobel Prize-winning work on climate change. LLNL also received three R&D 100 awards and six Nanotech 50 awards, and dozens of Laboratory scientists and engineers were recognized with professional awards. These honors provide valuable confirmation that peers and outside experts recognize the quality of our staff and our work. (4) Enhanced Business and Operations - A major thrust under LLNS is to make the Laboratory more efficient and cost competitive. We achieved roughly $75 million in cost savings for support activities through organizational changes, consolidation of services, improved governance structures and work processes, technology upgrades, and systems shared with Los Alamos National Laboratory. We realized nonlabor cost savings of $23 million

  14. Results of monitoring at Olkiluoto in 2008. Environment

    International Nuclear Information System (INIS)

    Haapanen, A.

    2009-09-01

    This Working Report presents the main results of Posiva Oy's environmental monitoring programme on Olkiluoto Island in 2008. These summary reports have been published since 2005 (target year 2004). The environmental monitoring system supervised by Posiva Oy produces input for biosphere modelling for long-term safety purposes as well as for monitoring the state of the environment during the construction (and later operation) of ONKALO underground characterization facility. Although some of the nuclear power production related monitoring studies by TVO (the power company) have been going on from the 1970s, the repository-related environmental monitoring of Olkiluoto Island has only recently been comprehensive. However, the monitoring programme evolves according to experiences from modelling work and increasing knowledge of most important site data. For example, in addition to the originally planned activities, in 2008 several studies on fauna were carried out, some soil and vegetation transects running from land to sea were established, a separate survey of water quality with automatic detectors was carried out and zooplankton and organic carbon studies were started in context of sea monitoring. In the monitoring data, the ongoing construction work (OL3, ONKALO and related infrastructure) is seen for instance in raised levels of noise and some deposited elements. The land-use continues to change, but where there is natural environment is affected by the cooling water from the nuclear power plant. (orig.)

  15. Comet C/2004 P1 (NEAT)

    Czech Academy of Sciences Publication Activity Database

    Tichá, J.; Tichý, M.; Kušnirák, Peter

    -, č. 8383 (2004), s. 1 ISSN 0081-0304 R&D Projects: GA AV ČR IAA3003204 Institutional research plan: CEZ:AV0Z1003909 Keywords : new comet * astrometry Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  16. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  17. Oak Ridge National Laboratory Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  18. Revenues and Expenditures for Public Elementary and Secondary School Districts: School Year 2008-09 (Fiscal Year 2009). First Look. NCES 2012-313

    Science.gov (United States)

    Cornman, Stephen Q.; Noel, Amber M.

    2011-01-01

    This report presents data from the School District Finance Survey (F-33) of the Common Core of Data (CCD) survey system for school year (SY) 2008-09 (fiscal year [FY] 2009). The F-33 is a district-level financial survey that consists of data submitted annually to the National Center for Education Statistics (NCES) and the Governments Division of…

  19. Seismicity in the Vicinity of Yucca Mountain, Nevada, for the Period October 1, 2004 to September 30, 2006

    International Nuclear Information System (INIS)

    Smith, Ken

    2007-01-01

    This report describes earthquake activity within approximately 65 km of Yucca Mountain site during the October 1, 2004 to September 30, 2006 time period (FY05-06). The FY05-06 earthquake activity will be compared with the historical and more recent period of seismic activity in the Yucca Mountain region. The relationship between the distribution of seismicity and active faults, historical patterns of activity, and rates of earthquakes (number of events and their magnitudes) are important components in the assessment of the seismic hazard for the Yucca Mountain site. Since October 1992 the University of Nevada has compiled a catalog of earthquakes in the Yucca Mountain area. Seismicity reports have identified notable earthquake activity, provided interpretations of the seismotectonics of the region, and documented changes in the character of earthquake activity based on nearly 30 years of site-characterization monitoring. Data from stations in the seismic network in the vicinity of Yucca Mountain is collected and managed at the Nevada Seismological Laboratory (NSL) at the University of Nevada Reno (UNR). Earthquake events are systematically identified and cataloged under Implementing Procedures developed in compliance with the Nevada System of Higher Education (NSHE) Quality Assurance Program. The earthquake catalog for FY05-06 in the Yucca Mountain region submitted to the Yucca Mountain Technical Data Management System (TDMS) forms the basis of this report

  20. PDX experimental results in FY82

    International Nuclear Information System (INIS)

    Kaye, S.M.; Bell, M.; Bol, K.

    1983-08-01

    This report presents a detailed summary of the major experimental results of PDX in FY82 and represents the efforts of the entire PDX group. Topics covered include β-scaling and fishbone studies, fluctuations, disruptions, impurities and impurity transport, power handling, limiter conditioning, edge studies, plasma fueling, counter-injection, and diagnostic development. A less detailed version will appear as the FY82 PDX contribution to the PPPL Annual Report

  1. FY 1991 report on the bituminous coal liquefaction section; 1991 nendo rekiseitan ekikabukai hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    The paper reported activities of the bituminous coal liquefaction section in FY 1991. In the 1st bituminous coal liquefaction section meeting, report/discussion were made on the outline of the plan on the FY 1991 research using pilot plant and the support study of pilot plant. In the 2nd section meeting, report was made on 'How the development of coal liquefaction technology should be in the 21st century,' a report made by the joint section of bituminous coal/brown coal liquefaction. In the 3rd section meeting, report/discussion were made on the state of progress of the FY 1991 R and D and results. In the study using the bituminous coal liquefaction pilot plant, report was made on the outline of construction of a 150t/d pilot plant, study on the acquisition of material balance, analytical study of the data on liquefaction tower, testing survey on properties of coal slurry, and testing survey on slurry preheating furnace. In the support study of pilot plant, report was made on the study using 1t/d PUS, study on the development of the optimum coal refining technology and improvement in the distillate distribution, study of conditions for coal liquefaction and study of solvent hydrogenation catalyst. (NEDO)

  2. Review of Department of Energy HEPA filter test activities, FY 1990--FY 1992

    International Nuclear Information System (INIS)

    McIntyre, J.A.

    1992-01-01

    Filter Test Facilities (FTFs) and the FTF Technical Support Group (TSG) continue to provide services to the Department of Energy (DOE). Additional tasks relating to the HEPA filter cycle have been added to the TSG. The tasks include the quality assessment review for the in-place testing of HEPA filters at DOE sites and the formation of an in-place testing standards writing group. Summary of ongoing FTFs and TSG activities for FY 1990-FY 1992 including the technical input for implementation of the High Flow Alternative Test System (HFATS), update of the DOE Standards, the status of the quality assessment review and in-place testing standards writing group are discussed

  3. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  4. Accelerator/Experiment Operations - FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    Czarapata, P. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); et al.

    2015-10-01

    This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2015. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2015 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment and Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120).

  5. FY97 Geothermal R&D Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-09-01

    This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

  6. Individual account retirement plans: an analysis of the 2007 survey of consumer finances, with market adjustments to June 2009.

    Science.gov (United States)

    Copeland, Craig

    2009-08-01

    LATEST SCF DATA: This Issue Brief assesses the current status of Americans' savings for retirement by examining the incidence of individual account plans among families, as well as the average amount of assets accumulated in these accounts. The 2007 Survey of Consumer Finances (SCF), the Federal Reserve Board's triennial survey of wealth, is the basis for this study, as it is a leading source of data on Americans' wealth, provides detailed information on retirement plan incidence and account balances among families, and is the latest available. ACCOUNTING FOR THE ECONOMIC DOWNTURN: While 2007 SCF is the most comprehensive and current survey of Americans' finances, its timing was unfortunate due to the significant downturn in the economy in 2008 just after the survey was released. To account for that change, this analysis provides estimates of the changes in asset values from the end of 2007 to mid-June 2009 for individual account plan balances. The account balances of the defined contribution plans and IRAs are adjusted based on the asset allocation reported within the plans by using equity market returns and bond market returns from January 1, 2008, to June 19, 2009. MEDIAN ASSET LEVELS FOR DEFINED CONTRIBUTION PLANS: Among all families with a defined contribution plan in 2007, the median (mid-point) plan balance was $31,800, up 16 percent from 2004. According to EBRI estimates, this dropped 16.4 percent (to $26,578) from year-end 2007 to mid-June 2009. Losses were higher for families with more than $100,000 a year in income (down 22 percent) or having a net worth in the top 10 percent (down 28 percent). MEDIAN ASSET LEVELS FOR IRA/KEOGH PLANS: Among all families with an IRA/Keogh plan, the median value of their plan was $34,000 in 2007, up 3 percent from 2004. EBRI estimates this median value dropped 15 percent (to $28,955) from year-end 2007 to mid-June 2009. LESS THAN HALF OF ALL FAMILIES HAVE A RETIREMENT PLAN THROUGH A CURRENT JOB: In 2007, 40.6 percent of

  7. Trends in Alcohol Consumption among Undergraduate Students at a Northeastern Public University, 2002-2008

    Science.gov (United States)

    Bulmer, Sandra Minor; Irfan, Syed; Mugno, Raymond; Barton, Barbara; Ackerman, Louise

    2010-01-01

    Objective: This study examined alcohol consumption patterns and trends at a public university in the Northeast from 2002 to 2008. Participants: Stratified random sampling was used to select undergraduate students enrolled in courses during spring semesters in 2002, 2004, 2006, and 2008. Methods: Data were collected during regularly scheduled…

  8. Solid Waste Integrated Forecast Technical (SWIFT) Report FY 2001 to FY 2046 Volume 1

    International Nuclear Information System (INIS)

    BARCOT, R.A.

    2001-01-01

    In an effort to maintain an up-to-date Solid Waste Forecast, Fluor Hanford, Inc. requested a midyear update to the FY2001 Solid Waste Forecast collected in June 2000. Below is a list of generators reporting significant changes from the baseline FY2001 forecast, as well as approved generators previously not reporting wastes. The updated data was collected in February 2001. The cumulative effect of the changes in the near term was minor. Included in this update are waste generation maps for onsite facilities. The maps are updated annually and use the baseline forecast as a data reference

  9. NCPV FY 1998 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    McConnell, R. D.; Hansen, A.

    1999-07-19

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the National Center for Photovoltaics (NCPV) from October 1, 1997 through September 30, 1998 (FY 1998). The NCPV is part of the U.S. Department of Energy's (DOE's) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996-2000. The mission of the DOE National Photovoltaics Program is to make PV a significant part of the domestic economy--as an industry and as an energy resource. The two primary goals of the national program are to (1) maintain the U.S. industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NCPV provides leadership and support to the national program toward achieving its mission and goals.

  10. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The K Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.

  11. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    International Nuclear Information System (INIS)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ''Draft'' Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ''Draft'' MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The K Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million

  12. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1993-01-01

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94

  13. Electoral Mobilization for European Parliament Elections – A Portuguese Quasi-Experimental Plan for The 2004/2009 Elections

    Directory of Open Access Journals (Sweden)

    Jorge De Sá

    2014-02-01

    Full Text Available The European Parliament (EP elections have registered high rates of abstention and Portugal is no different from all the other EU countries. From a relational marketing paradigm, we have tried to define the concept of local proximity-based political communication, the grounds for a research program based on a quasi-experimental plan aimed at verifying a set of assumptions on the effects of local proximity-based political communication on the mobilization of Portuguese voters for the EP elections of 2004 and 2009. The results are clear: the proximity-based political communication generated significant electoral mobilization in those two elections.

  14. A study to analyze IAEA planning of 2004-2005 programme and to establish cooperation directions with the IAEA

    Energy Technology Data Exchange (ETDEWEB)

    Oh, K. B.; Lee, K. S.; Lee, B. W.; Ko, H. S.; Ryu, J. S.; Lee, T. J.; Kim, M. R

    2003-07-01

    The objective of this study is to utilize the IAEA effectively through reflecting Korea's opinion fully for the planning of the Agency's 2004{approx}2005 Programme. This study first analyzed the current status of the IAEA Programme and Budget and reviewed the issues relevant to Korea. Second, this study assessed the IAEA 2004{approx}2005 Programme and drew up Korea's opinion for it. The official document including the opinions was submitted to the Secretariat. In reviewing the Programme, this study considered the strengths of Korea related to the Programme. Also some projects and CRPs, which can be lead by Korea, were proposed. The IAEA 2004{approx}2005 Programme reflected well the technical and social changes and its structure seems to be proper. The budget was proposed to be increased over 10%, violating the zero-real growth principle. This seems to be inevitable considering the increase of safeguards activities. However, there should be prepared some measures to avoid rapid increase of the burdens of the Member States. In the process of the planning of the IAEA 2004{approx}2005 Programme, the following points should be emphasized. First, SMR activities should be given a high priority considering the high interests of developing countries and be set up as a separate project as in the 2002{approx}2003 Programme. Second, more budget should be allocated for Project A.4.04(Support for demonstration of nuclear seawater desalination), considering the highest priority of the project in Program A. Third, it's better to change the title of Subprogram C.3 to 'Nuclear knowledge Preservation' to stick to the original rationale of the subprogram. There is a need for further activities such as establishing and implementing the concept of international nuclear school based on the result of the feasibility study done in 2002{approx}2003. Fourth, further activities needs to be added to the Project D.2.03 for the efficient conversion to high density

  15. 76 FR 9399 - Department of State FY10 Service Contract Inventory

    Science.gov (United States)

    2011-02-17

    ... DEPARTMENT OF STATE [Public Notice 7321] Department of State FY10 Service Contract Inventory... Contract Inventory. SUMMARY: The Department of State has publically released its Service Contract Inventory for FY10. Section 743 of Division C of the FY 2010 Consolidated Appropriations Act, Public Law 111-117...

  16. Airspace Systems Program: Next Generation Air Transportation System Concepts and Technology Development FY2010 Project Plan Version 3.0

    Science.gov (United States)

    Kopardekar, Parimal H.

    2010-01-01

    This document describes the FY2010 plan for the management and execution of the Next Generation Air Transportation System (NextGen) Concepts and Technology Development (CTD) Project. The document was developed in response to guidance from the Airspace Systems Program (ASP), as approved by the Associate Administrator of the Aeronautics Research Mission Directorate (ARMD), and from guidelines in the Airspace Systems Program Plan. Congress established the multi-agency Joint Planning and Development Office (JPDO) in 2003 to develop a vision for the 2025 Next Generation Air Transportation System (NextGen) and to define the research required to enable it. NASA is one of seven agency partners contributing to the effort. Accordingly, NASA's ARMD realigned the Airspace Systems Program in 2007 to "directly address the fundamental research needs of the Next Generation Air Transportation System...in partnership with the member agencies of the JPDO." The Program subsequently established two new projects to meet this objective: the NextGen-Airspace Project and the NextGen-Airportal Project. Together, the projects will also focus NASA s technical expertise and world-class facilities to address the question of where, when, how and the extent to which automation can be applied to moving aircraft safely and efficiently through the NAS and technologies that address optimal allocation of ground and air technologies necessary for NextGen. Additionally, the roles and responsibilities of humans and automation influence in the NAS will be addressed by both projects. Foundational concept and technology research and development begun under the NextGen-Airspace and NextGen-Airportal projects will continue. There will be no change in NASA Research Announcement (NRA) strategy, nor will there be any change to NASA interfaces with the JPDO, Federal Aviation Administration (FAA), Research Transition Teams (RTTs), or other stakeholders

  17. Annual report of Naka Fusion Research Establishment from April 1, 2004 to March 31, 2005

    International Nuclear Information System (INIS)

    Yamamoto, Takumi; Sato, Masayasu; Kudo, Yusuke; Shu, Wataru; Yoshida, Hidetoshi

    2005-09-01

    Facing Components, a screw tube has been developed as a possible option for the ITER divertor. For the design of ITER Test Blanket Module (TBM), two candidates, namely Water Cooled Solid Breeder TBM and Helium Cooled Solid Breeder TBM have been proposed. An outline design of an electrochemical hydrogen pump has been carried out as a candidate of the advanced Blanket Tritium Recovery system. Using DT neutrons, neutronics integral experiments have been performed with a blanket mockup at FNS facility to predict the tritium breeding ratio with an error less than 5%. As one of the most promising structural materials for the ITER TBM and DEMO blankets, F82H has been investigated. In the IFMIF program, transitional activities have been continued. In the ITER Program, along the work plan approved on June 2004 under the framework of the ITER Transitional Arrangements, the Design and R and D Tasks have been carried out by the Participant Teams. In FY 2004 JAERI has been in charge of fifty-five Design Tasks that make the implementation of preparing the procurement documents for facilities and equipments that are scheduled to be ordered at an early stage of ITER construction. The site issues have been continuously discussed among the delegations of six parties/area and through the bilateral negotiation between Japan and the EU based on a viewpoint of 'a broader approach' concept. Finally, in the fusion reactor design studies, the conceptual design of the fusion DEMO plant which is placed beyond ITER has progressed. Three options with different capabilities of center solenoid (CS) coil are studied. Researches on the physics related to the ramp up CS-less reactor, and waste management have progressed. (J.P.N.)

  18. Engineered Barrier Testing at the INEEL Engineered Barriers Test Facility: FY-1997 and FY-1998

    International Nuclear Information System (INIS)

    Keck, K. N.; Porro, I.

    1998-01-01

    techniques are described. The wetting tests were designed to stress the test plots to the maximum by forcing drainage to occur. Drainage generally occurred two to three days following the start of the wetting test. Drainage from the capillary/biobarrier test plots stopped sooner than drainage from the thick soil test plots. Similar results were observed in drainage data collected in FY-98 following the spring thaw. Drainage from the capillary/biobarrier test plots following the winter of 1998 represents about one-third of the precipitation occurring during that period compared to two-thirds of the precipitation from the thick soil test plots. By limiting drainage, the capillary/biobarriers increased water storage in the upper portions of the test plots compared to the thick soil barriers. The data evaluated in this report come from an ongoing project. The aftereffects of the wetting tests continue to be monitored. Long-term monitoring under ambient conditions, the application of additional treatments to the test plots, and numerical modeling are planned for the future

  19. Hanford Site Waste Management Plan

    International Nuclear Information System (INIS)

    1988-12-01

    The Hanford Site Waste Management Plan (HWMP) was prepared in accordance with the outline and format described in the US Department of Energy Orders. The HWMP presents the actions, schedules, and projected costs associated with the management and disposal of Hanford defense wastes, both radioactive and hazardous. The HWMP addresses the Waste Management Program. It does not include the Environmental Restoration Program, itself divided into the Environmental Restoration Remedial Action Program and the Decontamination and Decommissioning Program. The executive summary provides the basis for the plans, schedules, and costs within the scope of the Waste Management Program at Hanford. It summarizes fiscal year (FY) 1988 including the principal issues and the degree to which planned activities were accomplished. It further provides a forecast of FY 1989 including significant milestones. Section 1 provides general information for the Hanford Site including the organization and administration associated with the Waste Management Program and a description of the Site focusing on waste management operations. Section 2 and Section 3 describe radioactive and mixed waste management operations and hazardous waste management, respectively. Each section includes descriptions of the waste management systems and facilities, the characteristics of the wastes managed, and a discussion of the future direction of operations

  20. FY2012 CoC Competition Grants (New and Renewal)

    Data.gov (United States)

    Department of Housing and Urban Development — This report displays the FY2012 renewal and new homeless assistance projects awarded by HUD for the FY2012 Continuum of Care (CoC) Program competition. Approximately...