WorldWideScience

Sample records for plan final environmental

  1. Proposed Owyhee Resource Management Plan and Final Environmental Impact Statement

    OpenAIRE

    U.S. Bureau of Land Management

    1999-01-01

    Five alternatives are described and analyzed i9n the final Environmental Impact Statement. Alternative A is a continuation of current management. Alternative B was developed through BLM staff interpretation and analysis of information submitted by the Owyhee Country Commissioners with the assistance of the Owyhee County Natural Resources Committee. Alternative C was developed by the BLM lower Snake River District interdisciplinary planning team. Alternative D was developed through BLM staff i...

  2. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2011-04-29

    ... National Park Service Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement... Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan, Biscayne National... Impact Statement for the Coral Reef Restoration Plan (Plan/FEIS) for Biscayne National Park, Florida. The...

  3. 2006 Long Range Development Plan Final Environmental ImpactReport

    Energy Technology Data Exchange (ETDEWEB)

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been

  4. 64 FR 34266 - Notice of Availability of Proposed Owyhee Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    1999-06-25

    ... Bureau of Land Management Notice of Availability of Proposed Owyhee Resource Management Plan and Final... Resource Management Plan (RMP) and associated final Environmental Impact Statement (EIS) for the Owyhee... the Owyhee Proposed Resource Management Plan, which is Alternative E in the final EIS. The...

  5. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  6. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Science.gov (United States)

    2010-04-16

    ... Bureau of Indian Affairs Final Environmental Impact Statement for Drought Management Planning at the Kerr... Management Planning at the Kerr Hydroelectric Project, Flathead Lake, Montana, is now available for public review and comment. DATES: The BIA will issue a final decision on drought management planning at the Kerr...

  7. 76 FR 77249 - Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone National...

    Science.gov (United States)

    2011-12-12

    ... National Park Service Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone..., Yellowstone National Park. SUMMARY: Pursuant to Sec. 102(2)(C) of the National Environmental Policy Act of... announces the availability of the Record of Decision for the Winter Use Plan for Yellowstone National...

  8. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2012-07-15

    what future CCC/USDA actions may be necessary, with the ultimate goal of achieving classification of the Sylvan Grove site at no further action status. The proposed activities are to be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory, a nonprofit, multidisciplinary research center operated by the UChicago Argonne, LLC, for the U.S. Department of Energy. Argonne provides technical assistance to the CCC/USDA concerning environmental site characterization and remediation at former grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. That document should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Sylvan Grove.

  9. 77 FR 12877 - Record of Decision for the General Management Plan/Abbreviated Final Environmental Impact...

    Science.gov (United States)

    2012-03-02

    ... National Park Service Record of Decision for the General Management Plan/Abbreviated Final Environmental... Management Plan for New River Gorge National River, West Virginia. The Record of Decision selects the... the Record of Decision selecting Alternative 5 as the approved General Management Plan for New River...

  10. Final Environmental Impact Statement Rocky Mountain Arsenal National Wildlife Refuge Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This final environmental impact statement identifies the purpose and need for a management plan; outlines the legal foundation for management of the Rocky Mountain...

  11. Final Comprehensive Conservation Plan and Environmental Impact Statement: San Luis Valley National Wildlife Refuge Complex

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This final Comprehensive Conservation Plan (CCP) and Environmental Impact Statement was written to guide management on Alamosa, Monte Vista, and Baca National...

  12. Alaska Peninsula National Wildlife Refuge: Final Comprehensive Conservation Plan, Environmental Impact Statement, and Wilderness Review

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document includes a final environmental impact statement (EIS) for the Alaska Peninsula Refuge Comprehensive Conservation Plan. It describes five alternative...

  13. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Science.gov (United States)

    2010-11-24

    ... Planning) and Director's Order Number 12 (Conservation Planning, Environmental Impact Analysis, and Decision- making), the NPS announces the availability of a Final Environmental Impact Statement for the GMP... experiences to be achieved in the Addition. DATES: The National Park Service will execute a Record of Decision...

  14. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2013-02-22

    ... Bureau of Land Management Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management... of 1969, as amended, and the Federal Land Policy and Management Act of 1976, as amended, the Bureau...

  15. 78 FR 38072 - General Management Plan, Final Environmental Impact Statement, Guadalupe Mountains National Park...

    Science.gov (United States)

    2013-06-25

    ... National Park Service General Management Plan, Final Environmental Impact Statement, Guadalupe Mountains... Plan, Guadalupe Mountains National Park, Texas. DATES: The NPS will execute a Record of Decision no... CONTACT: Dennis A. V squez, Superintendent, Guadalupe Mountains National Park, HC 60, Box 400, Salt...

  16. 77 FR 42761 - Final Environmental Impact Statement for the Oil and Gas Management Plan at Big South Fork...

    Science.gov (United States)

    2012-07-20

    ... National Park Service Final Environmental Impact Statement for the Oil and Gas Management Plan at Big South... the availability of a Final Environmental Impact Statement (FEIS) for the Oil and Gas Management Plan... could be implemented for current and future management of oil and gas at these park units. It provides...

  17. Proposed Owyhee resource management plan and final environmental impact statement, Volume 2

    OpenAIRE

    U.S. Bureau of Land Management

    1999-01-01

    Five alternatives are described and analyzed in the final Environmental Impact Statement. Alternative A is a continuation of current management. Alternative B was developed through BLM staff interpretation and analysis of information submitted by the Owyhee Country Commissioners with the assistance of the Owyhee County Natural Resources Committee. Alternative C was developed by the BLM lower Snake River District interdisciplinary planning team. Alternative D was developed through BLM staff in...

  18. Proposed Owyhee Resource Management Plan and Final Environmental Impact Statement, Vol. 3

    OpenAIRE

    U.S. Bureau of Land Management

    1999-01-01

    Five alternatives are described and analyzed in the final Environmental Impact Statement. Alternative A is a continuation of current management. Alternative B was developed through BLM staff interpretation and analysis of information submitted by the Owyhee Country Commissioners with the assistance of the Owyhee County Natural Resources Committee. Alternative C was developed by the BLM lower Snake River District interdisciplinary planning team. Alternative D was developed through BLM staff in...

  19. 78 FR 24232 - Record of Decision for the Denali Park Road Final Vehicle Management Plan and Environmental...

    Science.gov (United States)

    2013-04-24

    ... Decision (ROD) for the Vehicle Management Plan and Environmental Impact Statement for Denali National Park... of the park's General Management Plan (GMP). The NPS will propose a modification to the current park... National Park Service Record of Decision for the Denali Park Road Final Vehicle Management Plan and...

  20. 75 FR 19422 - Availability of a Final Environmental Impact Statement for the General Management Plan (FEIS/GMP...

    Science.gov (United States)

    2010-04-14

    ... National Park Service Availability of a Final Environmental Impact Statement for the General Management... of availability of a Final Environmental Impact Statement for the General Management Plan (FEIS/GMP... Alternative, which would continue current management practices and trends, with no major changes in direction...

  1. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  2. 77 FR 54922 - Record of Decision for the General Management Plan/Final Environmental Impact Statement, Hampton...

    Science.gov (United States)

    2012-09-06

    ... National Park Service Record of Decision for the General Management Plan/Final Environmental Impact... Region signed the Record of Decision selecting Alternative 3 as the approved General Management Plan (GMP... (NEPA), the National Park Service (NPS) announces the availability of the Record of Decision for the...

  3. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Science.gov (United States)

    2010-03-05

    ... Doc No: 2010-4414] DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final... Impact Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the... availability of the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On...

  4. Final Amendment to the Comprehensive Conservation Plan & Environmental Assessment: Flint Hills National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is an amendment, accompanied by an Environmental Assessment (EA), to the current 2000 Comprehensive Conservation Plan (CCP) for Flint Hills NWR. The purpose of...

  5. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2011-12-02

    ... use authorizations, mineral resources, recreation, renewable energy, special designations... resource uses with protections; Alternative B, which emphasizes resource conservation and protection; and... Bureau of Land Management Notice of Availability of the Proposed Resource Management Plan and Final...

  6. Bayou Savage NWR Final Environmental Impact Statement-Refuge Master Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Final EIS-Refuge Master Plan outlines 4 major alternatives for the management, policies, facilities, and administration of the Refuge and identifies the...

  7. 77 FR 39253 - Final Environmental Impact Statement on the Denali Park Road Vehicle Management Plan, Denali...

    Science.gov (United States)

    2012-07-02

    ... electronic format online at the NPS Planning, Environmental and Public Comment Web site at http... the impacts of the alternatives for managing vehicle use along the Denali Park Road. Since the mid... service was added for visitor transportation. The present approach for managing vehicles on the park road...

  8. 78 FR 8184 - DEEPWATER HORIZON Oil Spill; Final Phase II Early Restoration Plan and Environmental Review

    Science.gov (United States)

    2013-02-05

    ... Early Restoration Plan and Environmental Review (Phase II ERP/ER) describing the second set of... availability of the Phase II ERP/ER. ADDRESSES: Obtaining Documents: You may download the Phase II ERP/ER and... the Phase II ERP/ER at any of the public repositories listed at...

  9. 77 FR 23741 - DEEPWATER HORIZON Oil Spill; Final Phase I Early Restoration Plan and Environmental Assessment

    Science.gov (United States)

    2012-04-20

    ... Fish and Wildlife Service DEEPWATER HORIZON Oil Spill; Final Phase I Early Restoration Plan and... DEEPWATER HORIZON Oil Spill (Framework Agreement), notice is hereby given that ] the Federal and State... the DEEPWATER HORIZON oil spill, which occurred on or about April 20, 2010, in the Gulf of Mexico....

  10. Operations, Maintenance, and Replacement 10-Year Plan 1990-1999 : Environmental Strategy. Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-09-01

    In operating and maintaining its regional power transmission system, Bonneville Power Administration (BPA) must address environmental concerns. Pollution sources and pathways for pollution migration, including potential contamination from hazardous or toxic materials, are present. BPA must develop and follow precautionary measures, respond to emergencies, minimize wastes, redress past problems, alert and train employees to problems and safety needs, constantly evaluate this effort and update the program for improvements and changes in regulations and technology. Part of BPA's mission is to conduct its operation, maintenance, and replacement programs in an environmentally sound manner. BPA recognizes its responsibility to be good stewards of the environment. BPA will meet its environmental obligations as set forth in environmental laws and regulations. BPA intends to make consistent and measurable progress toward meeting these responsibilities. The target for the 10-Year Plan is to achieve environmental compliance and meet the following goals: (1) protect human health and the environment; (2) avoid or limit liability (3) set up an effective internal management structure to maintain compliance; and (4) achieve cost-effective compliance. 6 figs.

  11. Final Report: African Power/Energy and Environmental Development Plan, July 1, 1994 - August 21, 1999

    Energy Technology Data Exchange (ETDEWEB)

    Butler, John M.

    1999-08-21

    In 1994 AEF signed a Cooperative Agreement with DOE to address a program called the African Power /Energy and Environmental Development Plan. The Program initially addressed five area: (1) Historical Black Colleges and Universities Energy/Environmental Program; (2) The Department of Energy and United States Private Industry Africa Program; (3) The Annual United States Energy Study Tour; (4) South African Training Program, and (5) South African Environmental Program. The programs were implemented in conjunction with DOE, institutions, agencies and the private sector support in the USA and within African nations. AEF has worked with government and technical representatives from 13 African nations and expanded the program to address sponsorship of South African students in Historical Black Colleges and Universities, supporting DOE trade missions through participation and planning, and giving presentations in the U.S., and Africa regarding business opportunities in the African energy sector. The programs implemented have also opened doors for the US private sector to seek business opportunities in Africa and for African nations to gain exposure to US products and services.

  12. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  13. Planning for a program design for energy environmental analysis. Final report, draft

    Energy Technology Data Exchange (ETDEWEB)

    Denton, J; Saaty, T; Blair, P; Ma, F; Buneman, P

    1976-04-01

    The objective of the work reported here is to assist BER/ERDA in program planning with respect to a regional assessment study program for energy environmental analysis. The focus of the work was to examine the use of operational gaming fof regional assessment studies. Specific concerns were gaming applications (1) in regional assessment or management and direction of regional assessments; (2) for achieving a higher level of public understanding of environmental, health, and safety problems of energy; (3) with respect to the supply of adequately trained manpower for energy; (4) with respect to computational requirements; and (5) with respect to current state-of-the-art in computer simulation. In order to investigate these concerns and examine the feasibility of using operational gaming in a regional assessment study program, a Regional Energy Environment Game (REEG) was designed and implemented on an IBM 370/168 digital computer employing APL (A Programming Language). The applicability of interactive operational gaming has been demonstrated by the REEG as applied to a region consisting of Delaware, Maryland, New Jersey, Pennsylvania, and the District of Columbia.

  14. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  15. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  16. 76 FR 81962 - Final Environmental Impact Statement for General Management Plan, Ross Lake National Recreation...

    Science.gov (United States)

    2011-12-29

    ... planning process and soliciting feedback on issues to be addressed in park planning. The Notice of Intent..., public workshops and informal meetings, the NPS Planning, Environment, and Public Comment (PEPC) Web site... opportunity to learn about the general management planning project and to offer comments. During the scoping...

  17. Rocky Flats National Wildlife Refuge: Final Comprehensive Conservation Plan and Environmental Impact Statement

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Rocky Flats NWR for the next 15 years. This plan outlines the Refuge vision and purpose...

  18. Klamath Marsh National Wildlife Refuge: Final Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Klamath Marsh NWR for the next 15 years. This plan outlines the Refuge vision and...

  19. Sheldon National Wildlife Refuge: Final Comprehensive Conservation Plan and Environmental Impact Statement

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Sheldon NWR for the next 15 years. This plan outlines the Refuge vision and purpose and...

  20. Hanford Reach National Monument: Final Comprehensive Conservation Plan and Environmental Impact Statement

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Hanford Reach National Monument for the next 15 years. This plan outlines the Monument...

  1. Farallon National Wildlife Refuge: Final Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Farallon NWR for the next 15 years. This plan outlines the Refuge vision and purpose...

  2. Roanoke River National Wildlife Refuge: Comprehensive Conservation Plan & Final Environmental Impact Statement

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Roanoke River NWR for the next 15 years. This plan outlines the Refuge vision and...

  3. Modoc National Wildlife Refuge: Final Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Modoc NWR for the next 15 years. This plan outlines the Refuge vision and purpose and...

  4. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Harpers Ferry National...

    Science.gov (United States)

    2010-05-18

    ... Statement for the General Management Plan; Harpers Ferry National Historical Park AGENCY: National Park... Statement for the General Management Plan for Harpers Ferry National Historical Park. SUMMARY: Pursuant to... Harpers Ferry [[Page 27813

  5. Ellicott Slough National Wildlife Refuge: Final Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Ellicott Slough NWR for the next 15 years. This plan outlines the Refuge vision and...

  6. 77 FR 12076 - Final Programmatic Environmental Impact Statement and Integrated Water Resource Management Plan...

    Science.gov (United States)

    2012-02-28

    ... Management Plan, Yakima River Basin, Water Enhancement Project, Benton, Kittitas, Klickitat, and Yakima... analyzed the elements of the Integrated Water Resource Management Plan in the FPEIS. The FPEIS addresses... management plan includes three major components (Habitat, Systems Modification, and Water Supply) which...

  7. 78 FR 25762 - Notice of Availability of the Final Trail Management Plan/Final Environmental Impact Statement...

    Science.gov (United States)

    2013-05-02

    ... facilities from the other action alternatives that the NPS believes would best fit Cuyahoga Valley National... trails management that best meets the goals of the plan and minimizes impacts to the resources of... facilities, and maintenance and best management practices. The Guidelines will serve as the Standard...

  8. Texas Chenier Plain Refuge Complex: Final Environmental Impact Statement, Comprehensive Conservation Plan, and Land Protection Plan (Volumes 1 and 2)

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Texas Chenier Plains Refuge Complex for the next 15 years. This plan outlines the...

  9. 77 FR 74027 - Winter Use Plan, Final Environmental Impact Statement Amended Record of Decision, Yellowstone...

    Science.gov (United States)

    2012-12-12

    ..., Yellowstone National Park, Idaho, Montana, and Wyoming AGENCY: National Park Service, Interior. ACTION: Notice... Winter Use Plan, Yellowstone National Park. SUMMARY: Pursuant to Sec. 102(2)(C) of the National... availability of the Amended Record of Decision for the Winter Use Plan for Yellowstone National Park,...

  10. 78 FR 760 - Notice of Availability of the Final General Management Plan/Final Environmental Impact Statement...

    Science.gov (United States)

    2013-01-04

    ... opportunities to enjoy appropriate low-impact outdoor recreation. Ecological resources would largely be managed to reveal the glacial landscape. The most sensitive ecological areas would be carefully protected... alternative. The Final GMP/EIS assesses impacts to soil resources, water quality, soundscapes, vegetation...

  11. Final Environmental Impact Statement For The Great Dismal Swamp National Wildlife Refuge Master Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Great Dismal Swamp Refuge Master Plan guides the long-range development of the Refuge by identifying and integrating appropriate habitats, management strategies,...

  12. Final Restoration Plan for Rose Atoll National Wildlife Refuge, including Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Restoration Plan for Rose Atoll NWR consists of removing the metal debris remaining from the grounding of a Taiwanese fishing vessel in 1993, and monitoring the...

  13. 77 FR 35999 - Notice of Availability of the Proposed Resource Management Plan/Final Environmental Impact...

    Science.gov (United States)

    2012-06-15

    ..., Arizona 85222. Gila Bend Public Library, 202 North Euclid Avenue, Gila Bend, Arizona 85337. Salazar-Ajo Branch Library, 33 Plaza, Ajo, Arizona 85321. The LS-SDNM Planning Area includes approximately...

  14. Alaska Maritime National Wildlife Refuge: Final Comprehensive Conservation Plan, Wilderness Review, and Environmental Impact Statement

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) describes three alternatives for managing Alaska Maritime National Wildlife Refuge and identifies the possible...

  15. Environmental guidelines for development of Cultural Resource Management plans. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The purpose of this document is to provide guidelines to the DOE field managements with responsibility for the development of an individual Cultural Resource Management Plan for each DOE facility and program.

  16. San Francisco Bay National Wildlife Refuge Predator Management Plan and Final Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The U.S. Fish and Wildlife Service has prepared an environmental assessment to evaluate the effects associated with the implementation of a predator management...

  17. Final Environmental Assessment: For Joint Base Anacostia-Bolling Master Plan District of Columbia

    Science.gov (United States)

    2010-09-30

    Environmental Assessment pg. 62 Table 8: Travel Mode Splits 1853 1854 Travel Type Percentage Single-Occupant Vehicle 75% Carpool and Vanpool...place. Service provided on two routes. 4) Ridesharing ( Carpools and Vanpools) Agency subsidizes vanpools. Informal carpools encouraged. No

  18. 75 FR 61174 - Warner Valley Comprehensive Site Plan, Final Environmental Impact Statement, Lassen Volcanic...

    Science.gov (United States)

    2010-10-04

    ... ``environmentally preferred'' course of action is identified. Background: Warner Valley is located in the south... concession employee housing, storage, generator, and propane tanks out of the Historic District and into a.... Alternative 2 (agency preferred) components include: (a) Ecological restoration of Warner Valley fen through...

  19. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Science.gov (United States)

    2012-03-21

    .... Baltimore County Tourism Office and Towson Chamber of Commerce, 44 West Chesapeake Avenue, Towson, Maryland... review from October 11, 2010, through December 24, 2010. Printed copies of the Draft GMP/EIS were... responses are provided on page 135 of the Final GMP/EIS. After careful review of all comments...

  20. Final Environmental Assessment for the Integrated Cultural Resources Management Plan for Edwards Air Force Base, California

    Science.gov (United States)

    2005-07-01

    Ocean by the Coastal Range to the west and the San Gabriel Mountains to the south. The MDAB has an arid continental desert climate. The climate of...River Indian Tribes Beverly Folks Pauline Gallegos FINAL July 2005 70 ICRMP EA Ernie Garcia , Tejon Indian Tribe Christine Hernandez Lucille Hicks...Band of Mission Indians Deron Marquez , San Manuel Band of Mission Indians Kathy Morgan, Tejon Indian Tribe George Murillo, San Manuel Band of

  1. Record of Decision for the Final Comprehensive Conservation Plan and Environmental Impact for the Rocky Mountain Arsenal NWR

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This record of decision (ROD) for the final environmental impact statement (EIS) for the Rocky Mountain Arsenal National Wildlife Refuge, Colorado provides the basis...

  2. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  3. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  4. Assessment of BRAC 133 Final Environmental Assessment of July 2008 and Transportation Management Plan of July 2010

    Science.gov (United States)

    2011-04-20

    ESA) found “oil staining and arsenic and lead concentrations above Commonwealth of Virginia Voluntary Remediation Plan ( VRP ) Tier III Screening levels...Transportation VA Virginia VDEQ Virginia Department of Environmental Quality VDOT Virginia Department of Transportation VRE Virginia Railway Express VRP

  5. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  6. 77 FR 20843 - Record of Decision for the Nabesna Off-Road Vehicle Management Plan and Final Environmental...

    Science.gov (United States)

    2012-04-06

    ... National Park Service Record of Decision for the Nabesna Off-Road Vehicle Management Plan and Final... documents decisions regarding off-road vehicle management in the Nabesna District of Wrangell-St. Elias..., Interior. ACTION: Notice of availability of a record of decision for the Nabesna Off-Road Vehicle...

  7. Environmental monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  8. Environmental implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  9. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  10. Environmental Education Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    This document is designed to guide the Environmental Education and Development Branch (EM-522) of the EM Office of Technology (OTD) Development, Technology Integration and Environmental Education Division (EM-52) in planning and executing its program through EM staff, Operations Offices, National Laboratories, contractors, and others.

  11. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Althouse, P E; Bertoldo, N A; Bowen, B M; Brown, R A; Campbell, C G; Christofferson, E; Gallegos, G M; Grayson, A R; Jones, H E; Larson, J M; Laycak, D; Mathews, S; Peterson, S R; Revelli, M J; Rueppel, D; Williams, R A; Wilson, K; Woods, N

    2005-11-23

    The purpose of the environmental monitoring plan (EMP) is to promote the early identification of, and response to, potential adverse environmental impacts associated with DOE operations. Environmental monitoring supports the Integrated Safety Management System (ISMS) to detect, characterize, and respond to releases from DOE activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of the DOE activity. In addition, the EMP addresses the analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of radionuclide samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. Until recently, environmental monitoring at Lawrence Livermore National Laboratory (LLNL) was required by DOE Order 5400.1, which was canceled in January 2003. LLNL is in the process of adopting the ISO 14001 Environmental Management Systems standard, which contains requirements to perform and document environmental monitoring. The ISO 14001 standard is not as prescriptive as DOE Order 5400.1, which expressly required an EMP. LLNL will continue to prepare the EMP because it provides an organizational framework for ensuring that the work is conducted appropriately. The environmental monitoring addressed by the plan includes preoperational characterization and assessment, and effluent and surveillance monitoring. Additional environmental monitoring is conducted at LLNL as part of the compliance with the

  12. Environmental Management System Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most

  13. Final Comprehensive Conservation Plan and Environmental Impact Statement: Little Pend Oreille National Wildlife Refuge: Volumes 1 and 2

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Little Pend Oreille NWR for the next 15 years. This plan outlines the Refuge vision and...

  14. Arctic National Wildlife Refuge: Revised Comprehensive Conservation Plan, Final Environmental Impact Statement, Wilderness Review, and Wild and Scenic River Review

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Arctic NWR for the next 15 years. It is a revision of the 1988 plan, and it describes...

  15. Final Environmental Impact Statement for the Stillwater National Wildlife Refuge Complex Comprehensive Conservation Plan and Boundary Revision

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Stillwater NWR Complex for the next 15 years. This plan outlines the Complex vision and...

  16. Sacramento, Delevan, Colusa, and Sutter National Wildlife Refuges: Final Comprehensive Conservation Plan and Environmental Assessment: Volume 1

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Sacramento, Delevan, Colusa, and Sutter NWRs for the next 15 years. This plan outlines...

  17. Hopper Mountain, Bitter Creek, and Blue Ridge National Wildlife Refuges: Final Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) executive summary was written to guide management on Hopper Mountain National Wildlife Refuge Complex for the next 15...

  18. Final environmental assessment and land protection plan proposal to expand the boundary of the Edwin B. Forsythe National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This environmental assessment, completed in January 1994, outlines the United States Fish and Wildlife Service’s proposal to expand the Edwin B. Forsythe National...

  19. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Althouse, P E; Biermann, A; Brigdon, S L; Brown, R A; Campbell, C G; Christofferson, E; Clark, L M; Folks, K J; Gallegos, G M; Gouveia, F J; Grayson, A; Harrach, R J; Hoppes, W G; Jones, H; Mathews, S; Merrigan, J R; Peterson, S R; Revelli, M; Rueppel, D; Sanchez, L; Tate, P J; Vellinger, R J; Ward, B; Williams, R

    2006-01-10

    Environmental monitoring personnel from Lawrence Livermore National Laboratory (LLNL) prepared this ''Environmental Monitoring Plan'' (EMP) to meet the requirements in the U.S. Department of Energy (DOE) ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' (DOE 1991) and applicable portions of DOE Orders 5400.1 and 5400.5 (see WSS B93 and B94 in Appendix B). ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' is followed as a best management practice; under Work Smart Standards, LLNL complies with portions of DOE Orders 5400.1 and 5400.5 as shown in Appendix B. This document is a revision of the May 1999 EMP (Tate et al. 1999) and is current as of March 1, 2002. LLNL is one of the nation's premier applied-science national security laboratories. Its primary mission is to ensure that the nation's nuclear weapons remain safe, secure, and reliable, and to prevent the spread and use of nuclear weapons worldwide. LLNL's programs in advanced technologies, energy, environment, biosciences, and basic science apply LLNL's unique capabilities and enhance the competencies needed for this national security mission. LLNL's mission also involves working with industrial and academic partners to increase national competitiveness and improve science education. LLNL's mission is dynamic and has changed over the years to meet new national needs. In keeping with the Laboratory's mission, the environment, safety, and health (ES&H) have top priority. LLNL's policy is to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage. The environment, safety, and health are to be priority considerations in the planning and execution of all work activities at the Laboratory (LLNL 2001

  20. 78 FR 25973 - Final Environmental Impact Statement for the Real Property Master Plan at the Presidio of...

    Science.gov (United States)

    2013-05-03

    ... properties: the POM and the Ord Military Community (OMC), collectively referred to as the POM Installation... support facilities, such as the combined fire and police Emergency Services Center, are planned at the OMC...--POM and OMC. Under the POM and OMC Alternative, new construction is proposed at both locations. Some...

  1. 78 FR 15738 - Notice of Availability of Final General Management Plan/Environmental Impact Statement for Effigy...

    Science.gov (United States)

    2013-03-12

    ... available on the internet at the NPS Planning, Environment, and Public Comment Web site at http://www... (archeological, landscapes, ethnographic resources, and museum collections), to natural resources (soils, wild and scenic rivers, vegetation, fish and wildlife, special status species, and visual...

  2. Final Programmatic Environmental Assessment for Base-Wide Military Construction Planning at Kirtland Air Force Base, New Mexico

    Science.gov (United States)

    2013-11-01

    whiptail lizard (Aspidoscelis inornata), short- horned lizard (Phrynosoma douglassi), lesser earless lizard (Holbrookia maculata), bull snake (Pituophis...Peterson Field Guide to Western Birds. Houghton Mifflin Pub: Boston. pp. 432. Reid, F.A. 2006. Mammals of North America . Houghton Mifflin...ASSESSMENT FOR BASE-WIDE MILITARY CONSTRUCTION PLANNING AT KIRTLAND AIR FORCE BASE, NEW MEXICO Introduction : In accordance with the National

  3. 75 FR 17756 - Availability of the Final General Management Plan and Environmental Impact Statement (GMP/EIS...

    Science.gov (United States)

    2010-04-07

    ... the park and maximize the opportunity for visitors to experience solitude in natural settings that are... opportunities for relative quiet and solitude, and motorized boating and fishing would be appropriate throughout... opportunities for relative quiet and solitude. The potential environmental consequences are addressed for each...

  4. 78 FR 38359 - Notice of Availability of a Record of Decision on the Final General Management Plan/Environmental...

    Science.gov (United States)

    2013-06-26

    ... wildlife and natural values within the Monument, two of the three purposes for which the Monument was.../Environmental Impact Statement, Effigy Mounds National Monument, Iowa AGENCY: National Park Service, Interior... (GMP/EIS), Effigy Mounds National Monument (Monument), Iowa. ADDRESSES: Copies of the ROD are...

  5. Final Environmental Planning Technical Report

    Science.gov (United States)

    1984-01-01

    and Regional Hires, and Inmigration 1-8 For the Employment Demand Region of Influence 1.1-3 Estimated Material Requirements by Standard Industrial 1-10...Emissions Summary by Year D-14 D.4-1 Baseline - No Action Alternative Population Emissions D-16 D.4-2 Proposed Action Inmigrant Population Emissions... inmigrants , on an annual average basis. In general, locally available labor will fill all the road and construction jobs. 1-2 r .... . a.. ~ ...... . a

  6. Final Environmental Planning Technical Report

    Science.gov (United States)

    1984-01-01

    Southsider Cave 18. Sun River 19. Signal Butte 2-36 nz ANIS JUDITH MONTANA N. DAKOTA CRAZY Y& 4 r %k oil S. DAKOTA Titla"i AllTo. M 11TVIL1.11 Upu Rm $AMD...amounts of watered-down alcohol, basic to the Indian trade, tended to undermine tribal structures. Venereal disease was common, and smallpox eradicated

  7. Final Environmental Impact Statement Rocky Mountain Arsenal NWR

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This final environmental impact statement identifies the purpose and need for a management plan; outlines the legal foundation for management of the Rocky Mountain...

  8. Routine Radiological Environmental Monitoring Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  9. Final Draft Strategic Marketing Plan.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-02-01

    The Bonneville Power Administration (BPA) has developed a marketing plan to define how BPA can be viable and competitive in the future, a result important to BPA`s customers and constituents. The Marketing Plan represents the preferred customer outcomes, marketplace achievements, and competitive advantage required to accomplish the Vision and the Strategic Business Objectives of the agency. The Marketing Plan contributes to successful implementation of BPA`s Strategic Business Objectives (SBOs) by providing common guidance to organizations and activities throughout the agency responsible for (1) planning, constructing, operating, and maintaining the Federal Columbia River Power System; (2) conducting business with BPA`s customers; and (3) providing required internal support services.

  10. Technical planning activity: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  11. Interactive Environmental Planning

    DEFF Research Database (Denmark)

    Freudendal-Pedersen, Malene; Hartmann-Petersen, Katrine; Kjærulff, Aslak Aamot

    2017-01-01

    This article presents a research project on mobility management in Danish municipalities aimed at creating more sustainable mobilities. The project, called Formula M (2011–2014), worked within sciences, public and private sectors, and civil society. Often contemporary projects in both planning...... the planners involved in the project on their ‘why’ and ‘for what’. Based on a theoretical understanding of relational and collaborative planning the article contributes to an understanding of which approaches and methods can be used to facilitate the relationships and dialogues between many actors...

  12. Public Participation Applied to the Environmental Planning

    Institute of Scientific and Technical Information of China (English)

    Vognimary Marie Odette

    2005-01-01

    This paper focuses on the public participation in environmental planning.After the decade for inaccessible information related to the decision taken, actually, the program of public participation is the reference of all the decision making process.However, there are some factors that limit this process, such as poverty, illiteracy, ignorance and often the social inequality.Therefore, this study focuses first on the benefits of public participation in environmental planning, then the involvement of the local population, and finally the decision making access using a case study of Madagascar.

  13. CEBAF - environmental protection program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan.

  14. 2002 WIPP Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  15. Environmental Monitoring Plan, Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting

  16. INEL Geothermal Environmental Program. Final environmental report

    Energy Technology Data Exchange (ETDEWEB)

    Thurow, T.L.; Cahn, L.S.

    1982-09-01

    An overview of environmental monitoring programs and research during development of a moderate temperature geothermal resource in the Raft River Valley is presented. One of the major objectives was to develop programs for environmental assessment and protection that could serve as an example for similar types of development. The monitoring studies were designed to establish baseline conditions (predevelopment) of the physical, biological, and human environment. Potential changes were assessed and adverse environmental impacts minimized. No major environmental impacts resulted from development of the Raft River Geothermal Research Facility. The results of the physical, biological, and human environment monitoring programs are summarized.

  17. Gulf of Mexico Sales 147 and 150: Central and Western planning areas. Final environmental impact statement, Volume 1: Sections 1 through 4.C

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This Final Environmental Impact Statement (EIS) covers the proposed 1994 Gulf of Mexico OCS oil and gas lease sales [Central Gulf of Mexico Sale 147 (March 1994) and Western Gulf of Mexico Sale 150 (August 1994)]. This document includes the purpose and background of the proposed actions, the alternatives, the descriptions of the affected environment, and the potential environmental impacts of the proposed actions and alternatives. Proposed mitigating measures and their effects are analyzed, in addition to potential cumulative impacts resulting from proposed activities.

  18. Environmental Monitoring Plan, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for

  19. Environmental Prosperity Game. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Berman, M.; Boyack, K.; VanDevender, J.P.

    1995-12-01

    Prosperity Games are an outgrowth and adaptation of move/countermove and seminar War Games. Prosperity Games are simulations that explore complex issues in a variety of areas including economics, politics, sociology, environment, education and research. These issues can be examined from a variety of perspectives ranging from a global, macroeconomic and geopolitical viewpoint down to the details of customer/supplier/market interactions in specific industries. All Prosperity Games are unique in that both the game format and the player contributions vary from game to game. This report documents the Environmental Prosperity Game conducted under the sponsorship of the Silicon Valley Environmental Partnership. Players were drawn from all stakeholders involved in environmental technologies including small and large companies, government, national laboratories, universities, environmentalists, the legal profession, finance, and the media. The primary objectives of this game were to: investigate strategies for developing a multi-agency (national/state/regional), one-step regulatory approval process for certifying and implementing environmental technologies and evaluating the simulated results; identify the regulatory hurdles and requirements, and the best approaches for surmounting them; identify technical problems and potential resources (environmental consultants, labs, universities) for solving them. The deliberations and recommendations of these players provided valuable insights as to the views of this diverse group of decision makers concerning environmental issues, including the development, licensing, and commercialization of new technologies.

  20. 75 FR 26270 - Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning...

    Science.gov (United States)

    2010-05-11

    ... SECURITY Federal Emergency Management Agency Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning and Historic Preservation Mitigation Policy AGENCY: Federal... Emergency Management Agency (FEMA) is accepting comments on a draft Environmental Planning and Historic...

  1. Savannah River Site Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  2. 76 FR 62442 - Final Environmental Impact Report/Environmental Impact Statement for Upper Truckee River...

    Science.gov (United States)

    2011-10-07

    ... Bureau of Reclamation Final Environmental Impact Report/Environmental Impact Statement for Upper Truckee.... ACTION: Notice of availability. SUMMARY: The final Environmental Impact Report/Environmental Impact... publication of the final Environmental Impact Report/Environmental Impact Statement. ADDRESSES: The...

  3. Willamette Valley National Wildlife Refuges: Ankeny, Baskett Slough, and William L. Finley National Wildlife Refuges: Final Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Willamette Valley National Wildlife Refuge Complex for the next 15 years. This plan...

  4. Final Comprehensive Conservation Plan and Environmental Impact Statement: Charles M. Russell National Wildlife Refuge, UL Bend National Wildlife Refuge: Volumes 1 and 2

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Charles M. Russell NWR and UL Bend NWR for the next 15 years. This plan outlines the...

  5. Desert National Wildlife Refuge Complex: Ash Meadows, Desert, Moapa Valley, and Pahranagat National Wildlife Refuges: Final Comprehensive Conservation Plan and Environmental Impact Statement

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Desert NWR Complex for the next 15 years. This plan outlines the Complex vision and...

  6. Yukon Delta and Togiak National Wildlife Refuges Comprehensive Conservation Plan, Environmental Impact Statement, Wilderness Review, and Wild River Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is the Final Comprehensive Conservation Plan, Environmental Impact Statement, Wilderness Review, and Wild River Plan (CCP/EIS/WR/WRP) for the Yukon...

  7. Environmental Planning and Ecology Program Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  8. Environmental monitoring plan - environmental monitoring section. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Wilt, G.C. [ed.; Tate, P.J.; Brigdon, S.L. [and others

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

  9. Winter Use Plans Final Environmental Impact Statement Summary for the Yellowstone and Grand Teton National Parks and John D. Rockefeller, Jr., Memorial Parkway

    OpenAIRE

    United States, Department of the Interior, National Park Service

    2000-01-01

    This document presents and analyzes seven alternatives for winter use management in Yellowstone National Park (YNP), Grand Teton National Park (GTNP), and the John D. Rockefeller, Jr., Memorial Parkway (the Parkway). YNP, encompassing 2.22 million acres, and GTNP, comprising 310,000 acres, form the core of the Greater Yellowstone Ecosystem, described as the last large, nearly intact ecosystem in the northern temperate zone. The approved plan will serve as a management plan for the three na...

  10. ENVIRONMENTAL TECHNOLOGY VERIFICATION COATINGS AND COATING EQUIPMENT PROGRAM (ETV CCEP), FINAL TECHNOLOGY APPLICATIONS GROUP TAGNITE--TESTING AND QUALITY ASSURANCE PLAN (T/QAP)

    Science.gov (United States)

    The overall objective of the Environmental Testing and Verification Coatings and Coating Equipment Program is to verify pollution prevention and performance characteristics of coating technologies and make the results of the testing available to prospective coating technology use...

  11. Work plan : Comprehensive Conservation Plan : environmental assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this work plan is to ensure that the Arapaho NWR Refuge Manager and Region-6 staff agree on the direction for preparation of the CCP/EA for Arapaho...

  12. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2012-08-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  13. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2010-10-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  14. Idaho National Laboratory Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2008-04-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  15. 78 FR 11672 - Notice of Availability of the Final Environmental Impact Statement for the Alta East Wind Project...

    Science.gov (United States)

    2013-02-19

    ... (CDCA) Plan Amendment/Final Environmental Impact Statement (EIS) for the Alta East Wind Project (Project... Project's final EIS in the Federal Register. ADDRESSES: Copies of the Alta East proposed plan amendment... Bureau of Land Management Notice of Availability of the Final Environmental Impact Statement for the...

  16. Environmentally conscious manufacturing integrated demonstration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Gentry, D.E.

    1993-07-01

    The objective of the Environmentally Conscious Manufacturing Integrated Demonstration was to show that several of the individually developed materials and processes to reduce hazardous materials and waste could be successfully used on a single assembly. A methodology was developed that could be used on any product to plan the approach to eliminating hazardous materials. Sample units of an existing design electronic unit were fabricated applying this methodology and substituting nonhazardous materials and processes. The results of this project show that total waste can be drastically reduced by at least an order of magnitude and hazardous material and waste can be essentially eliminated in the manufacture of this type of electronic devices.

  17. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  18. Environmental Monitoring Plan - February 2016

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bertoldo, N. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Blake, R. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fish, C. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Grayson, A. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Griffin, D. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jones, H. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Patterson, L. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Revelli, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rosene, C. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wegrecki, T M; Williams, R A; Wilson, K R

    2016-02-08

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection oft/ic Pubile and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the hiota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements.

  19. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Jenifer Nordstrom

    2014-02-01

    This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Nonroutine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

  20. Waste Isolation Pilot Plant Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2004-02-19

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  1. Waste Isolation Pilot Plant Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2004-02-19

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  2. Environmental considerations in physical planning in Norway and Poland

    Energy Technology Data Exchange (ETDEWEB)

    Naess, P.; Saglie, I.L.; Glowacki, W.; Dunin-Woyseth, H.

    1997-12-31

    As a part of an agreement on environmental cooperation between Norway and Eastern Europe, a comparative case study was carried out of environmental considerations in physical planning since 1968 in the Norwegian municipality of Sandefjord and the Polish municipality of Myslenice. This report discusses the final results. Land use planning is surprisingly similar in the two countries. In both, the plans emphasize the protection of farmland and scarce biotopes as well as sewage management. In Myslenice, a major concern has been cultural heritage and cultural landscapes while in Sandefjord attention was paid more to natural areas for outdoor recreation. In both cases there has been little focus on energy conservation and the concept of sustainable development has hardly been discussed. The plans have been considerably influenced by national environmental policies. The type of political system, capitalism vs. state socialism, has indirectly influenced the amount of construction and hence the pace of conversion of undeveloped land, but does not appear to have had much impact on the environmental content of the plans. The emphasis laid on various environmental issues in part reflects the actual local challenges, but also cross-national cultural differences and the fact that during the period the environmental agenda has been widened in both municipalities, most clearly seen in the case of Sandefjord. The plans seem to have been considerably influenced by professional ideals, knowledge and methods common among planners across national boundaries. 52 refs., 1 figure, 2 tabs.

  3. Sustainable Local Development and Environmental Governance: A Strategic Planning Experience

    Directory of Open Access Journals (Sweden)

    Giuseppe Ioppolo

    2016-02-01

    Full Text Available The emphasis on learning and adaptation among different actors at various political administrative levels and on various geographic scales has become a precondition for the emergence of sustainable development. It is possible to find the essential form of collaborative management by using a Strategic Plan, designed to determine a local model of sustainable competitiveness in economic, social and environmental terms. The adoption of a Strategic Plan stimulates a process of shared knowledge, through which it is possible to generate a new environmental governance (EG that is truly representative of a local system. This paper presents, as a case study representative of the Italian context, the Strategic Plan of the Nebrodi area (SP, and assesses the structure of a new form of public and private environmental governance focused on sustainable concern. Finally, the SP could be considered a guideline for managing the local territorial and environmental system from a long-term perspective.

  4. 75 FR 52967 - Final Environmental Impact Statement and South Florida and Caribbean Parks Exotic Plant...

    Science.gov (United States)

    2010-08-30

    ... Palm Beach, Florida. A Notice of Intent to prepare an environmental impact statement (EIS) for South... National Park Service Final Environmental Impact Statement and South Florida and Caribbean Parks Exotic... environmental impact statement for the South Florida and Caribbean Parks Exotic Plant Management Plan....

  5. 10 CFR 51.93 - Distribution of final environmental impact statement and supplement to final environmental impact...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of final environmental impact statement and supplement to final environmental impact statement; news releases. 51.93 Section 51.93 Energy NUCLEAR... Environmental Impact Statements-General Requirements § 51.93 Distribution of final environmental impact...

  6. Israel : Gulf of Aqaba Environmental Action Plan

    OpenAIRE

    World Bank; European Union

    2000-01-01

    The Gulf of Aqaba Environmental Action Plan (GAEAP) represents for the Government of Israel a step towards achieving the national environmental objectives outlined in its legislation. The proposed actions, both curative and preventive, will protect the Gulf's land and water interface and ensure conservation of natural resources within a framework in which economic development can take plac...

  7. Issues in infrastructure and environmental planning

    NARCIS (Netherlands)

    Linden, Gerardus; Ike, Paul; Voogd, Henk; Linden, Gerard; Voogd, Henk

    2004-01-01

    This chapter focuses on issues of Environmental and Infrastructure planning (EIP). The object of EIP is illustrated with the help of the three layers of the Environmental Layer Concept (ELC) – the Ground Layer, the Infrastructure Layer and the Occupancy Layer. The Ground Layer represents the natural

  8. ENVIRONMENTAL CARRYING CAPACITY BASED ON SPATIAL PLANNING

    OpenAIRE

    Luthfi Muta'ali

    2013-01-01

    The aims of this research were to examine environmental carrying capacity analyzed based on aspects of spatial planning and eco-region. The result showed that Kulonprogo Regency has low value of environmental carrying capacity and can only support as much as 79.81% of its total population. Analysis of variance showed significant difference of environmental carrying capacity of protected and cultivated area. The main factor among 12 variables determining the degree of environmen...

  9. Final Environmental Planning Technical Report. Transportation

    Science.gov (United States)

    1984-01-01

    Manpower Requirements by Year 1-8 1.1-2 Total Jobs, Local and Regional Hires, and Inmigration 1-8 for the Region of Influence 1.1-3 Estimated Material... inmigrants , on an annual average basis. In general, locally available labor will fill all the road and construction jobs. 1-6 t ’ Ct)- 0n0 ý-I Cjk : 4...Estimates based on average quarterly employment. Table 1.1-2 TOTAL JOBS, LOCAL AND REGIONAL HIRES, AND INMIGRATION FOR THE EMPLOYMENT DEMAND REGION

  10. Final Environmental Planning Technical Report. Utilities

    Science.gov (United States)

    1984-01-01

    Manpower Requirements by Year 1-8 1.1-2 Total Jobs, Local and Regional Hires, and Inmigration 1-8 for the Employment Demand Region of Influence 1.1-3...weekly commuters and inmigrants , on an annual average basis. In general, locally available labor will fill all the road and construction jobs. 1-6 Lf...employment. Table 1.1-2 TOTAL JOBS, LOCAL AND REGIONAL HIRES, AND INMIGRATION FOR THE EMPLOYMENT DEMAND REGION OF INFLUENCE 1991 and 1984 1985 1986 1987

  11. 78 FR 76176 - Notice of Availability of the Record of Decision for the Final Trail Management Plan...

    Science.gov (United States)

    2013-12-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR National Park Service Notice of Availability of the Record of Decision for the Final Trail Management Plan... the Record of Decision (ROD) for the Final Trail Management Plan/ Environmental Impact Statement (Plan...

  12. 76 FR 71598 - Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Final Comprehensive Conservation Plan...

    Science.gov (United States)

    2011-11-18

    .... These small brackish/saltwater pools are found in the raised limestone coral reef, and are connected to... Comprehensive Conservation Plan and Finding of No Significant Impact for Environmental Assessment AGENCY: Fish... Wildlife Service (Service), announce the availability of the final comprehensive conservation plan...

  13. Waste Isolation Pilot Plant Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-03-12

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  14. 40 CFR 124.61 - Final environmental impact statement.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Final environmental impact statement... environmental impact statement. No final NPDES permit for a new source shall be issued until at least 30 days after the date of issuance of a final environmental impact statement if one is required under 40 CFR 6...

  15. 23 CFR 771.125 - Final environmental impact statements.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Final environmental impact statements. 771.125 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.125 Final environmental impact statements. (a)(1..., economic, or environmental impacts of the action may need to be more fully explored; (iii) the impacts of...

  16. 77 FR 45652 - Final Program Environmental Impact Statement/Environmental Impact Report for the San Joaquin...

    Science.gov (United States)

    2012-08-01

    ... Bureau of Reclamation Final Program Environmental Impact Statement/Environmental Impact Report for the... prepared a joint Final Program Environmental Impact Statement/Environmental Impact Report (Final PEIS/R...: Notice of availability. SUMMARY: Pursuant to the National Environmental Policy Act and the...

  17. Planning Support Systems (PSS-Based Spatial Plan Alternatives and Environmental Assessment

    Directory of Open Access Journals (Sweden)

    Hee-Sun Choi

    2016-03-01

    Full Text Available Spatial planning is at the core of national land and urban development. Many countries and cities seek sustainable development through various means such as coordinated environmental planning, environmental assessment, and internalization of environmental analysis and planning. A Planning Support System (PSS is a GIS (Geographic Information System-based, spatial decision-making support system that incorporates a variety of theories and pertinent models. This study adopted the “What if?” model to design an alternative spatial plan that includes generation of predictive scenarios and is relatively easy to use. In the cities studied, we identified a total of six scenarios based on the main drivers of development—namely, population and spatial policies. Subsequently, we assessed the alternatives for their environmental impact, preparing sensitivity maps for each major environmental issue in the target area (natural ecosystem, air and microclimate, natural disasters. One projected advantage of the “What if?” model is that its digital visualization of proposed plans may improve public awareness and involvement. Furthermore, the tool is expected to be highly useful in ensuring the objectivity of quantitative analyses. However, it is necessary to develop a PSS that is both standardized and tailored to the particular needs of each area. Finally, the development of an e-governance system will be beneficial in ensuring public access to the decision making process.

  18. 75 FR 77896 - Notice of Availability: Tamiami Trail Modifications: Next Steps Project, Final Environmental...

    Science.gov (United States)

    2010-12-14

    ... Director's Order Number 2 (Park Planning) and Director's Order Number 12 (Conservation Planning, Environmental Impact Analysis, and Decision- making), the NPS announces the availability of a Final....'' DATES: The NPS will execute a Record of Decision (ROD) no sooner than 30 days following publication by...

  19. FINAL MASTER PLAN FOR STELLA, MISSOURI

    Science.gov (United States)

    The application of sustainability to place is the outcome of responding to human needs and expectations within economic, social, and environmental constraints and desired performance of these systems. These constraints and performance requirements of these systems provides a way ...

  20. 16 CFR 1.85 - Final environmental impact statements.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Final environmental impact statements. 1.85... Final environmental impact statements. (a) After the close of the comment period, the Bureau responsible for the matter will consider the comments received on the draft environmental impact statement and...

  1. A Guide for Environmental Health Planning

    Science.gov (United States)

    Crawford, Gene M.

    1972-01-01

    Outlines objectives and resources to be assessed in a community environmental health plan. Considers: water; liquid waste disposal; housing maintenance; solid waste disposal; air pollution; food and food protection; rodent control; insect control; migrant labor camps; recreation sites; mobile homes - trailer parks; schools, institutions - public…

  2. A pragmatic phenomenological approach in environmental planning

    NARCIS (Netherlands)

    Pieters, W.

    2003-01-01

    This report describes a philosophical approach to issues of environmental planning. Although interventions in the landscape are often subject to extensive protests, a systematic critique of the presumptions involved in the design is missing. A thorough analysis of the issue requires a philosophical

  3. Central Okanagan smart transit plan : final report

    Energy Technology Data Exchange (ETDEWEB)

    McNally, R.A. [IBI Group, Vancouver, BC (Canada)

    2005-04-15

    This report outlines the steps and financial aspects of implementing the smart transit plan for the Central Okanagan region, one of British Columbia's fastest growing regions. The plan, which is designed to enhance transit services, is affordable by all stakeholders and is adjustable, based on levels of ridership and availability of resources. The region is expected to grow from 160,000 to 225,000 people by 2021. Transit ridership has grown from just over 1 million passengers per year 10 years ago to almost 3 million passengers in 2003. This strong growth provides an opportunity to pursue a transit plan and land use plan that supports efficient modes of transportation such as transit, walking and cycling. This Smart Transit project involved collaboration with stakeholders to develop a vision for sustainable transit for the region; guidelines for promoting transit-supportive land use development and a business plan to direct transit investments to achieve the transit vision. The existing conditions of the transit system were described with reference to ridership performance by route, current transit ridership, recommended priorities, bus stop inventory, and comparison to other transit systems. Currently, the transit system in the Okanagan region has higher than average ridership compared to similar Canadian systems. It is also as cost-effective as similar sized transit systems. Areas of improvement include better on-time transit service reliability; reduction in the level of graffiti and vandalism and the need to expand off-peak services. Historical and projected future transit system performance was also discussed with reference to system growth, productivity and cost. tabs., figs.

  4. Environmental offences: finally making the polluter pay?

    OpenAIRE

    Outhwaite, Opi

    2015-01-01

    This update focuses on developments in sentencing for environmental crimes. The imposition of appropriate penalties is crucial, not only to the use of judicial mechanisms for securing access to environmental justice, but also to respect for the polluter pays principle, a keystone of environmental law. There has been long-standing criticism in the UK of the failure of the courts to treat environmental crimes sufficiently seriously when imposing sentences. Fisher et al observed that insufficien...

  5. 78 FR 32269 - Notice of Availability of the Final Environmental Impact Statement/Environmental Impact Report...

    Science.gov (United States)

    2013-05-29

    ... Office of the Secretary Notice of Availability of the Final Environmental Impact Statement/Environmental Impact Report for Klamath Facilities Removal AGENCY: Office of Environmental Policy and Compliance... Department of Fish and Wildlife have prepared a final environmental impact statement and environmental...

  6. 77 FR 30320 - General Management Plan/Environmental Impact Statement, Ross Lake National Recreation Area, North...

    Science.gov (United States)

    2012-05-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR National Park Service General Management Plan/Environmental Impact Statement, Ross Lake National Recreation... the Final Environmental Impact Statement for the new General Management Plan (GMP) for Ross...

  7. 7 CFR 650.5 - Environmental evaluation in planning.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Environmental evaluation in planning. 650.5 Section...-Assisted Programs § 650.5 Environmental evaluation in planning. (a) General. Environmental evaluation (EE) integrates environmental concerns throughout the planning, installation, and operation of NRCS-assisted...

  8. UMTRA Project environmental, health, and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs.

  9. Master environmental plan for Fort Devens, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Biang, C.A.; Peters, R.W.; Pearl, R.H.; Tsai, S.Y. (Argonne National Lab., IL (United States). Energy Systems Div.)

    1991-11-01

    Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifies additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.

  10. 77 FR 24403 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Science.gov (United States)

    2012-04-24

    ... AGENCY 40 CFR Part 62 Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan...). ACTION: Direct final rule. SUMMARY: EPA is approving Illinois' revised State Plan to control air pollutants from ``Hazardous/Medical/Infectious Waste Incinerators'' (HMIWI). The Illinois Environmental...

  11. Reintroduction Plan for Bison at RMA-NWR [Final Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the final draft summary of a USFWS plan details the agency's intention to reintroduce bison into portions of the Rocky Mountain Arsenal National Wildlife...

  12. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  13. Waste Isolation Pilot Plant Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Westinghouse Electric Company Waste Isolation Division

    1999-09-29

    DOE Order 5400.1, General Environmental Protection Program Requirements (DOE, 1990a), requires each DOE facility to prepare an EMP. This document is prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment (DOE, 1990b); Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) 834, Radiation Protection of the Public and Environment (Draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1 (DOE, 1995), which is the driver for the Annual Site Environmental Report (ASER) and the guidance source for preparing many environmental program documents. The WIPP project is operated by Westinghouse Electric Company, Waste Isolation Division (WID), for the DOE. This plan defines the extent and scope of the WIPP's effluent and environmental monitoring programs during the facility's operational life and also discusses the WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE, 1991). This document references DOE orders and other federal and state regulations affecting environmental monitoring programs at the site. WIPP procedures

  14. Yukon Flats National Wildlife Refuge: Comprehensive Conservation Plan, Environmental Impact Statement, and Wilderness Review

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is the final Comprehensive Conservation Plan (CCP), Environmental Impact Statement (EIS), and Wilderness Review (WR) for the Yukon Flats National...

  15. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  16. Environmental planning and management in Greater Johannesburg.

    Science.gov (United States)

    Von Schirnding, Y E

    1996-03-01

    This article describes the actions among urban environmental, management, and development planners in Greater Johannesburg, South Africa. Initiatives, such as the Healthy Cities Project and Model Communities, are being integrated into an environmental management and development approach that attains the goals of Agenda 21. Greater Johannesburg has housing shortages and homelessness. Priority needs include the areas of housing, water, electricity, public transportation, and sanitation. Clean water and air are inequitably distributed. Other key environmental problems include illegal dumping, inadequate waste disposal, poor environmental hygiene in overcrowded inner city areas, lack of open spaces, flooding, and water scarcities. The newly formed metropolitan authority offers opportunities to improve coordination and integration of environmental problems. Stakeholders from government at all levels, politicians, nongovernmental organizations, and the business sector formed an intersectoral, interdepartmental environment management committee in 1995. Stakeholders will integrate Agenda 21 within broader urban development plans and processes. The executive committee and the full council approved a set of guiding principles on environmental policy and an administrative framework for management. Four workshops were held to ensure a participatory consultation process in 1995. The WHO Collaborating Center for Urban Health will be used to facilitate the work of the Greater Johannesburg Metropolitan Council. Changes are being made in the way local governments work.

  17. Integrated environmentally compatible soldering technologies. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Hosking, F.M.; Frear, D.R.; Iman, R.L.; Keicher, D.M.; Lopez, E.P.; Peebles, H.C.; Sorensen, N.R.; Vianco, P.T.

    1994-05-01

    Chemical fluxes are typically used during conventional electronic soldering to enhance solder wettability. Most fluxes contain very reactive, hazardous constituents that require special storage and handling. Corrosive flux residues that remain on soldered parts can severely degrade product reliability. The residues are removed with chlorofluorocarbon (CFC), hydrochlorofluorocarbon (HCFC), or other hazardous solvents that contribute to ozone depletion, release volatile organic compounds into the atmosphere, or add to the solvent waste stream. Alternative materials and processes that offer the potential for the reduction or elimination of cleaning are being developed to address these environmental issues. Timing of the effort is critical, since the targeted chemicals will soon be heavily taxed or banned. DOE`s Office of Environmental Restoration and Waste Management (DOE/EM) has supported Sandia National Laboratories` Environmentally Conscious Manufacturing Integrated Demonstration (ECMID). Part of the ECM program involves the integration of several environmentally compatible soldering technologies for assembling electronics devices. Fluxless or {open_quotes}low-residue/no clean{close_quotes} soldering technologies (conventional and ablative laser processing, controlled atmospheres, ultrasonic tinning, protective coatings, and environmentally compatible fluxes) have been demonstrated at Sandia (SNL/NM), the University of California at Berkeley, and Allied Signal Aerospace-Kansas City Division (AS-KCD). The university demonstrations were directed under the guidance of Sandia staff. Results of the FY93 Soldering ID are presented in this report.

  18. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  19. 76 FR 50247 - Willapa National Wildlife Refuge, Pacific County, WA; Final Comprehensive Conservation Plan and...

    Science.gov (United States)

    2011-08-12

    ... Fish and Wildlife Service Willapa National Wildlife Refuge, Pacific County, WA; Final Comprehensive Conservation Plan and Environmental Impact Statement AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce...

  20. 77 FR 76510 - Prime Hook National Wildlife Refuge, Sussex County, DE; Final Comprehensive Conservation Plan and...

    Science.gov (United States)

    2012-12-28

    ...-4311-K9-S3] Prime Hook National Wildlife Refuge, Sussex County, DE; Final Comprehensive Conservation... conservation plan (CCP) and environmental impact statement (EIS) for Prime Hook National Wildlife Refuge (NWR... should be consistent with sound principles of fish and wildlife management, conservation, legal...

  1. Klickitat Cogeneration Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  2. Final Addendum to the Necedah National Wildlife Refuge Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Addendum is to clarify actions that will be taken under the selected alternative for the Fire Management Plan Environmental Assessment that was...

  3. Final Environmental Assessment, Horse Creek Bridge Replacement

    Science.gov (United States)

    2010-10-01

    characterized and reviewed by 78 CEG/CEAN. Wastes contaminated with lead-based paint (LBP), asbestos-containing material (ACM), or other hazardous materials...these areas include poison ivy, lizard’s tail (Saururus cernuus), cardinal flower (Lobelia cardinalis), aquatic milkweed (Ascelpias perennis), Eastern...environmental site assessment reports, free product recovery reports, comprehensive site assessment and site characterization reports, closure reports

  4. Urban Environmental Education--Demonstration. Final Report.

    Science.gov (United States)

    Glasser, Roselyn; And Others

    This publication is composed of four parts. Part I, The Final Report, consists of the program foundations, description of the target group, description of resources, analysis of processes developed, creating the resource role, creation awareness, developing a problem solving orientation, curriculum integration, evolution of the group process,…

  5. 75 FR 26272 - Final Environmental Impact Statement; Environmental Education Center, Yosemite National Park...

    Science.gov (United States)

    2010-05-11

    ... National Park Service Final Environmental Impact Statement; Environmental Education Center, Yosemite... Environmental Impact Statement for development of a new environmental education center in Yosemite National Park... practical the NPS will begin to implement development of a new environmental education center at...

  6. Gulfport Harbor, Mississippi. Final Environmental Impact Statement

    Science.gov (United States)

    1989-06-01

    the finback whale (Balaenoptera physalus), humpback whale ( Megaptera novaeangliae ), sei whale (B. borealis), green sea turtle (Chelonia mydas...Environmental Policy Act, as amended, 42 USC 4321, et seq. Rivers and Harbors Act, 33 USC 401 et seq. Watershed Protection and Flood Prevention Act, 16...USC 1001, et seq. Wild and Scenic Rivers Act, as amended, 16 USC 1271, et seq. Uniform Relocation Assistance and Real Property Acquisition Policies Act

  7. Environmental training research project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    Santa Fe Community College serves an area including the city and county of Santa Fe. The population has a high percentage of Hispanics and a Native American population of about 3%. The student body at the college generally reflects that of the service district. The college strives to recruit students from all segments of the population so there is representation among all ethnic and economic groups. The college strives to serve students and the community by offering educational opportunities that meet the needs of both elements and which will lead to gainful employment. Instruction is also offered to meets needs for retraining, upgrades, and personal enlightenment. The college started a hazardous materials management program in the fall of 1991 which has since been renamed environmental management. The purpose of this program is to prepare students for environmental careers, to provide required training such as OSHA HAZWOPER and refresher courses, and to provide educational opportunities that would make the public more environmentally aware. The program content needs to be studied to ensure we`re meeting the needs of the students and the business community. There had not been a significant opportunity to conduct this research.

  8. LANL environmental restoration site ranking system: System description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Merkhofer, L.; Kann, A.; Voth, M. [Applied Decision Analysis, Inc., Menlo Park, CA (United States)

    1992-10-13

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides.

  9. Portsmouth Gaseous Diffusion Plant expansion: final environmental statement. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1977-09-01

    Volume 1 is comprised of chapters on: background and description; environmental impacts of add-on gaseous diffusion plant; unavoidable adverse environmental effects; alternatives; relationship between short-term uses and long-term productivity; relationship of program to land-use plans, policies, and controls; irreversible and irretrievable commitments of resources; cost-benefit analysis; and response to comment letters. (LK)

  10. Final Range Wide Environmental Impact Statement

    Science.gov (United States)

    2001-07-01

    Department of Fish and Game. The Rincon Indian Reservation also commented. Agencies expressed concern for biological, cultural, and water resources...Environmental Impact Statement 49 Figure 12. Vegetative Provinces of the Sonoran Desert. SO U RC E : Shreve & W igg ins, 1964 Needles Yum a San Luis ...County 76,205 106,895 119,650 Major Communities San Luis 1,946 4,212 7,910 Somerton 3,969 5,282 5,970 Wellton 911 1,066 1,075 Yuma 42,481 54,923 60,150

  11. Hawaii State Plan for Occupational Safety and Health. Final rule.

    Science.gov (United States)

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  12. Environmental-performance research priorities: Wood products. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-15

    This report describes a research plan to establish environmental, energy, and economic performance measures for renewable building materials, and to identify management and technology alternatives to improve environmental performance in a cost-effective manner. The research plan is designed to: (1) collect environmental and economic data on all life-cycle stages of the materials, (2) ensure that the data follows consistent definitions and collection procedures, and (3) develop analytical procedures for life-cycle analysis to address environmental performance questions. The research will be subdivided into a number of individual project modules. The five processing stages of wood used to organize the research plan are: (1) resource management and harvesting; (2) processing; (3) design and construction of structures; (4) use, maintenance, and disposal; and (5) waste recycling. Individual research module descriptions are provided in the report, as well as assessment techniques, research standards and protocol, and research management. 13 refs., 5 figs., 3 tabs.

  13. 77 FR 71446 - Notice of Availability of the Final Environmental Impact Statement for the West Chocolate...

    Science.gov (United States)

    2012-11-30

    ... Chocolate Mountains Renewable Energy Evaluation Area, Imperial County, CA, and the Proposed California... Environmental Impact Statement (EIS) for the West Chocolate Mountains Renewable Energy Evaluation Area (REEA... of the West Chocolate Mountains Renewable Energy Evaluation Area Final EIS/Proposed Plan Amendment...

  14. Final Environmental Assessment Ohio River Islands National Wildlife Refuge Proposal

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In this Final Environmental Assessment, the United States Fish and Wildlife Service describes various alternatives that could provide long-term protection to the...

  15. Yakima Fisheries Project : Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  16. Final environmental statement for the geothermal leasing program

    Energy Technology Data Exchange (ETDEWEB)

    1973-12-31

    This second of the four volumes of the Geothermal Leasing Program final impact statement contains the individual environmental statements for the leasing of federally owned geothermal resources for development in three specific areas: Clear Lake-Geysers; Mono Lake-Long Valley; and Imperial Valley, all in California. It also includes a summary of the written comments received and departmental responses relative to the Draft Environmental Impact Statement issued in 1971; comments and responses on the Draft Environmental Impact Statement; consultation and coordination in the development of the proposal and in the preparation of the Draft Environmental Statement; and coordination in the review of the Draft Environmental Statement.

  17. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 1, Environmental Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This is volume 1 of the final environmental impact statement of the Bonneville Power Administration Information is included on the following: Purpose of and need for action; alternatives including the proposed action; affected environment; and environmental consequences.

  18. Griffith Energy Project Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  19. Environmental assessment of advanced thin film manufacturing process. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Cunningham, D.W.; Mopas, E.; Skinner, D. [BP Solar, Inc., Fairfield, CA (United States); McGuire, L.; Strehlow, M. [Radian International, Walnut Creek, CA (United States)

    1998-09-01

    This report describes work performed by BP Solar, Inc., to provide an extensive preproduction analysis of waste-stream abatement at its plant in Fairfield, California. During the study, numerous technologies were thoroughly evaluated, which allowed BP Solar to select systems that outperformed the stringent federal and state regulations. The main issues were originally perceived to be controlling cadmium compound releases to both air and wastewater to acceptable levels and adopting technologies for air and water waste streams in an efficient, cost-effective manner. BP Solar proposed high-efficiency, reliable control equipment that would reduce air-contaminant emission levels below levels of concern. Cadmium telluride dust is successfully controlled with high-efficiency (>99.9%) bag-in/bag-out filters. For air abatement, carbon canisters provide efficient VOC reduction, and wastewater pretreatment is required per federal pretreatment standards. BP Solar installed a cadmium-scavenging ion exchange system and electrowinning system capable of removing cadmium to <10 ppb (local publicly-owned-treatment-works limits for cadmium is 30 ppb). BP Solar plans to maximize potential reuse of rinse waters by phasing in additional wastewater treatment technologies. Finally, the work to date has identified the areas that need to be revisited as production scales up to ensure that all health, safety, and environmental goals are met.

  20. Environmental Assessment : Crescent Lake National Wildlife Refuge Hunting Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Environmental Assessment (EA) is for the implementation of the Crescent Lake National Wildlife Refuge Hunting Plan that serves as a step down management plan to...

  1. Malheur National Wildlife Refuge Master Plan/Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the updated Malheur National Wildlife Refuge Master Plan and Environmental Assessment. It replaces the former Master Plan Technical Report that was prepared...

  2. Final work plan : groundwater monitoring at Morrill, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at Morrill, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Morrill being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Morrill.

  3. Final work plan : groundwater monitoring at Centralia, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2005-08-31

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at the site of a former grain storage facility at Centralia, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Centralia being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Centralia.

  4. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  5. Sport Fishing Plan : Meredosia National Wildlife Refuge : Environmental Action Memorandum

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Environmental Action Memorandum states that the Meredosia NWR Sport Fishing Plan is found not to have significant environmental effects.

  6. Quantification of environmental impacts of various energy technologies. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Selfors, A. [ed.

    1994-10-01

    This report discusses problems related to economic assessment of the environmental impacts and abatement measures in connection with energy projects. Attention is called to the necessity of assessing environmental impacts both in the form of reduced economic welfare and in the form of costs of abatement measures to reduce the impact. In recent years, several methods for valuing environmental impacts have been developed, but the project shows that few empirical studies have been carried out. The final report indicates that some important factors are very difficult to evaluate. In addition environmental impacts of energy development in Norway vary considerably from project to project. This makes it difficult to obtain a good basis for comparing environmental impacts caused by different technologies, for instance hydroelectric power versus gas power or wind versus hydroelectric power. It might be feasible however to carry out more detailed economic assessments of environmental impacts of specific projects. 33 refs., 1 fig., 4 tabs.

  7. 78 FR 68860 - Notice of Availability of a Final Environmental Impact Statement and Environmental Impact Report...

    Science.gov (United States)

    2013-11-15

    ... Bureau of Land Management Notice of Availability of a Final Environmental Impact Statement and Environmental Impact Report for the Proposed Stateline Solar Farm and Proposed California Desert Conservation... Impact Statement (EIS) and Draft Environmental Impact Report (EIR) for the Stateline Solar Farm...

  8. Omaha District Final Cultural Resource Site Monitoring Plan

    Science.gov (United States)

    2014-06-01

    Game , Fish, Parks and Recreation FINAL CULTURAL RESOURCES SITE MONITORING PLAN U.S. ARMY CORPS OF ENGINEERS, OMAHA DISTRICT JUNE 2014 Page | 2...to collect routine monitoring data, which is uploaded into CR-DMS. Pathfinder Office is utilized for pre and post processing of data. Detailed...collecting. The data dictionary is created in Pathfinder office and transferred to the unit. The data dictionary is utilized to collect information

  9. Spatial and environmental planning of sustainable regional development in Serbia

    OpenAIRE

    Maksin-Mićić Marija; Milijić Saša; Nenković-Riznić Marina

    2009-01-01

    The paper analyses the planning framework for sustainable territorial and regional development. The spatial and environmental planning should play the key role in coordination and integration of different planning grounds in achieving the sustainable regional development. The paper discusses the spatial planning capacity to offer the integral view of the sustainable territorial development. The brief review of tendencies in new spatial planning and regional policy has been given. The fo...

  10. Environmental impacts assessment for hydropower development planning in China

    Institute of Scientific and Technical Information of China (English)

    Gu Hongbin; Yu Weiqi; Cui Lei

    2009-01-01

    This article briefly introduced China's law framework and technical standards related to environmental im-pacts assessment(EIA) for hydropower development, and the EIA developing process for hydropower development plan-ning. Authors summarized the working experiences about hydropower development planning EIA done in the recent years in China, discussed the considerations and methods of hydropower development planning EIA, and put forward the index system for hydropower development planning EIA initially.

  11. Waste Feed Delivery Environmental Permits and Approvals Plan

    Energy Technology Data Exchange (ETDEWEB)

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  12. Final work plan for targeted sampling at Webber, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2006-05-01

    This Work Plan outlines the scope of work for targeted sampling at Webber, Kansas (Figure 1.1). This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). Data obtained in this sampling event will be used to (1) evaluate the current status of previously detected contamination at Webber and (2) determine whether the site requires further action. This work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan, approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document should be consulted for complete details of the technical activities proposed at the former CCC/USDA facility in Webber.

  13. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    Energy Technology Data Exchange (ETDEWEB)

    Naidu, J.R.; Paquette, D.; Lee, R. [and others

    1996-10-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

  14. Eastern Region Renewable Energy Planning Study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    For planning authorities to address renewable energy through development plan policies and in the development control process, it is important to have clear and reliable information on the resource potential within their area. A number of studies have been undertaken in England and Wales to assess the potential for the development and utilisation of renewable energy resources. The studies have addressed the practicalities of how and why a certain resource might be suitable for exploitation in a particular county or region, in conjunction with consideration of the specific planning and environmental issues which may arise. The Eastern Region Renewable Energy Planning Study (ERREPS) is one of the last of these studies to be commissioned and, together with a concurrent study of the Lancashire and Yorkshire area, will substantially complete study coverage of England and Wales. The study area comprises the counties of Bedfordshire, Buckinghamshire, Cambridgeshire, Essex, Hertfordshire, Norfolk and Suffolk. It generally coincides with the area covered by Eastern Electricity. The area covers the majority of the land north of the River Thames to The Wash. (author)

  15. FINAL CLOSURE PLAN SURFACE IMPOUNDMENTS CLOSURE, SITE 300

    Energy Technology Data Exchange (ETDEWEB)

    Lane, J E; Scott, J E; Mathews, S E

    2004-09-29

    Lawrence Livermore National Laboratory of the University of California (LLNL) operates two Class II surface impoundments that store wastewater that is discharged from a number of buildings located on the Site 300 Facility (Site 300). The wastewater is the by-product of explosives processing. Reduction in the volume of water discharged from these buildings over the past several years has significantly reduced the wastewater storage needs. In addition, the impoundments were constructed in 1984, and the high-density polyethylene (HDPE) geomembrane liners are nearing the end of their service life. The purpose of this project is to clean close the surface impoundments and provide new wastewater storage using portable, above ground storage tanks at six locations. The tanks will be installed prior to closure of the impoundments and will include heaters for allowing evaporation during relatively cool weather. Golder Associates (Golder) has prepared this Final Closure Plan (Closure Plan) on behalf of LLNL to address construction associated with the clean closure of the impoundments. This Closure Plan complies with State Water Resources Control Board (SWRCB) Section 21400 of the California Code of Regulations Title 27 (27 CCR {section}21400). As required by these regulations and guidance, this Plan provides the following information: (1) A site characterization, including the site location, history, current operations, and geology and hydrogeology; (2) The regulatory requirements relevant to clean closure of the impoundments; (3) The closure procedures; and, (4) The procedures for validation and documentation of clean closure.

  16. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

  17. Approaching plans and programmes under the strategic environmental assessment view

    Directory of Open Access Journals (Sweden)

    OROIAN I.

    2008-12-01

    Full Text Available Even strategic environmental assessment (SEA is a concept which must be implemented at national level,no official regulations concerning the implementation nor adequate knowledge of this problem exist. The briefpresentation of this concept is the aim of this study. By definition, SEA is a process aiming to supply the takinginto consideration of the impact upon the environment when developmental sugestions at policy, planprogramme or project levels are elaborated, before the final decision connected to their promotion. The processof SEA implementation and its seven stages (framing, domain definition, P/P evaluation, performing theEnvironmental Report, consultation with authories and public, taking decision and monitoring are presented inthis paper. The advantages of using this approach are also emphasized: acheiving sustainable management fromthe environmental point of view, improvement of the quality of the policy, plan or programme elaborationprocess, increase of the efficiency and efficacy of the decisonal process, stregthening of the leading system andinstitutional efficiency, strengthening of the EIA process for projects, facilitation of the transfrontaliercooperation.

  18. Foothills Parkway Section 8B Final Environmental Report, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Blasing, T.J.; Cada, G.F.; Carer, M.; Chin, S.M.; Dickerman, J.A.; Etnier, D.A.; Gibson, R.; Harvey, M.; Hatcher, B.; Lietzske, D.; Mann, L.K.; Mulholland, P.J.; Petrich, C.H.; Pounds, L.; Ranney, J.; Reed, R.M.; Ryan, P.F.; Schweitzer, M.; Smith, D.; Thomason, P.; Wade, M.C.

    1999-07-01

    In 1994, Oak Ridge National Laboratory (ORNL) was tasked by the National Park Service (NPS) to prepare an Environmental Report (ER) for Section 8B of the Foothills Parkway in the Great Smoky Mountains National Park (GSMNP). Section 8B represents 27.7 km (14.2 miles) of a total of 115 km (72 miles) of the planned Foothills Parkway and would connect the Cosby community on the east to the incorporated town of Pittman Center to the west.

  19. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  20. The State Environmental Protection Standards Planning During 11th Five-Year Plan (2006-2010)

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ This planning is stipulated to reinforce Decision by State Council on Reinforcing Environmental Protection with Views of Scientific Development, to give impetus to the environmental enforcement and supervision along legal, standardized and scientific lines, to strengthen well-structured laws and regulations for environmental protection, to improve the system of technical laws, regulations and standards for environmental protection, scientifically establish environmental standards and to dovetail environmental protection standards and targets.

  1. Climate change and uncertainty avoidance in spatial planning: Illuminated through environmental assessment of spatial plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    Uncertainty is an unavoidable part of spatial planning and related predictions, e.g. of environmental impacts of plan implementation. The uncertainty premise embedded in planning is highly relevant and critical for climate change. But how well is uncertainty handled in planning practice? This paper...... concerns the handling and non- handling of climate change uncertainties in spatial planning - by using the explicit consideration of uncertainty within the mandatory Strategic Environmental Assessment (SEA) of spatial plans as an indicator. This paper suggests that uncertainty it not handled very well...

  2. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  3. 75 FR 62133 - Notice of Availability of Final Environmental Assessment (FINAL EA) and a Finding of No...

    Science.gov (United States)

    2010-10-07

    ... Availability of Final Environmental Assessment (FINAL EA) and a Finding of No Significant Impact (FONSI) for... Environmental Assessment (FINAL EA) for Land Purchase, Access Road Construction and Access Tunnel Construction... HUMAN SERVICES Centers for Disease Control and Prevention Notice of Availability of Final...

  4. Energy Planning Policies With Environmental Considerations In Nigeria

    Directory of Open Access Journals (Sweden)

    C. U. Ike, and S. S. N. Okeke

    2013-05-01

    Full Text Available The last decade has witnessed a fundamental change in the planning process for development in Nigeria. It is now recognized that the dimension of environment protection is of vital importance for sustainable development. From the comparative survey of available energy planning models, it was found that the environmental considerations are limited only to estimating the pollution load, thus sending false price signals to the technology market and leading to environmentally distorted policy decisions. The main focus of this research is a methodology for integrated energy sector planning, policy impact assessment, and policy mix analysis, incorporating the impact of environmental externality cost of energy supply and use into the planning process. The model aims at determining the least cost energy planning policy path for Nigeria with the least environmental damage.

  5. [Environmental impact assessment based on planning support system].

    Science.gov (United States)

    Chen, Wen-Bo; Carsjens, Gerrit-Jan

    2011-02-01

    How to assess environmental impact is one of the keys in land use planning. This article described in detail the concepts of activities, impact zones, functions, and sensitivities, as well as the development of STEPP (strategic tool for integrating environmental aspects in planning procedures) based on Avenue, the secondary developing language of ArcView GIS. The system makes it convenient for planning practitioners exchanging information, and can spatially, visually and quantitatively describe environmental impact and its change. In this study, the urban-rural combination area located between EDE and Veenendaal of The Netherlands was taken as case, and the results indicated that the environment was incorporated well in the planning procedure based on the concepts, and could also demonstrate the effects of planning measures on environment spatially, explicitly, and in real-time, facilitating the participation of planning practitioners and decision-making. Some proposals of how to promote STEEP application in China were suggested.

  6. Big Oaks National Wildlife Refuge : Environmental Action Statement, Environmental Assessment, Interim Hunting and Fishing Plan : 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document contains the Environmental Action Statement, Environmental Assessment, and Interim Hunting and Fishing Plan for Big Oaks National Wildlife Refuge from...

  7. Geosciences for Urban Development and Environmental Planning

    Institute of Scientific and Technical Information of China (English)

    DrJonasSatkunas

    2004-01-01

    The aim of the International Workshop was to discuss and promote better applications of geoscientific information for urban planning and development, and encourage international geoenvironmental cooperation.

  8. Integration of Environmental Planning Into the Army Master Planning Process

    Science.gov (United States)

    1992-10-01

    1976; Willson, Tabas, and Henneman 1979, pp 139-149). Many researchers have pointed out that the suitability of the integration of the two processes...installation planner, who must elicit, translate , and synthesize the master plan objcctives of a number of disparate sources, including Major Commands, other...August 1988). Willson, John S., Philip Tabas, and Marian Henneman , Comprehensive Planning and the Environment, A Manual for Planners, (Abt Books

  9. 10 CFR 51.91 - Final environmental impact statement-contents.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-contents. 51.91... Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.91 Final environmental impact statement—contents. (a)(1) The final environmental impact statement will include responses...

  10. 10 CFR 51.94 - Requirement to consider final environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Requirement to consider final environmental impact...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.94 Requirement to consider final environmental impact statement. The final environmental impact statement...

  11. Final Environmental Assessment for the Military Family Housing Privatization Initiative

    Science.gov (United States)

    2006-09-01

    Year 2005 through 2009: VOCE = .016 * Trips NOxE = .015 * Trips PM10E = .0022 * Trips COE = .262 * Trips Appendix A Additional Materials Final...Environmental Assessment Page A-39 Military Family Housing Privatization Initiative Robins Air Force Base, Georgia Year 2010 and beyond: VOCE ...yr) = VOCE * DPYII/2000 NOx (tons/yr) = NOxE * DPYII/2000 PM10 (tons/yr) = PM10E * DPYII/2000 CO (tons/yr) = COE * DPYII/2000 Where: Area of

  12. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.

  13. 75 FR 50777 - Final Comprehensive Conservation Plan; John Hay National Wildlife Refuge, Merrimack County, NH

    Science.gov (United States)

    2010-08-17

    ... Fish and Wildlife Service Final Comprehensive Conservation Plan; John Hay National Wildlife Refuge... wildlife management, conservation, legal mandates, and our policies. In addition to outlining broad... Hampshire Wildlife Action Plan, Birds of Conservation Concern 2008, and other conservation plans at...

  14. Plan for advanced microelectronics processing technology application. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goland, A.N.

    1990-10-01

    The ultimate objective of the tasks described in the research agreement was to identify resources primarily, but not exclusively, within New York State that are available for the development of a Center for Advanced Microelectronics Processing (CAMP). Identification of those resources would enable Brookhaven National Laboratory to prepare a program plan for the CAMP. In order to achieve the stated goal, the principal investigators undertook to meet the key personnel in relevant NYS industrial and academic organizations to discuss the potential for economic development that could accompany such a Center and to gauge the extent of participation that could be expected from each interested party. Integrated of these discussions was to be achieved through a workshop convened in the summer of 1990. The culmination of this workshop was to be a report (the final report) outlining a plan for implementing a Center in the state. As events unfolded, it became possible to identify the elements of a major center for x-ray lithography on Lone Island at Brookhaven National Laboratory. The principal investigators were than advised to substitute a working document based upon that concept in place of a report based upon the more general CAMP workshop originally envisioned. Following that suggestion from the New York State Science and Technology Foundation, the principals established a working group consisting of representatives of the Grumman Corporation, Columbia University, the State University of New York at Stony Brook, and Brookhaven National Laboratory. Regular meetings and additional communications between these collaborators have produced a preproposal that constitutes the main body of the final report required by the contract. Other components of this final report include the interim report and a brief description of the activities which followed the establishment of the X-ray Lithography Center working group.

  15. Introduction to Participatory Environmental Planning (PEP) for sustainable urban development

    NARCIS (Netherlands)

    Duchhart, I.

    2000-01-01

    This training handbook is a result of the Environment and Urban Development Training Project. This project introduced participatory environmental planning for sustainable development of small and intermediate towns in Kenya. The human living environment was taken as the entry point.

  16. Features of strategic planning environmental marketing in agrosphere

    OpenAIRE

    I. Voronecka

    2012-01-01

    Grounded methodological basis for strategic planning of environmental marketing of agricultural enterprises, which allows to provide for a sustainable development of the agricultural sector economy in the uncertainty of the environment

  17. Introduction to Participatory Environmental Planning (PEP) for sustainable urban development

    NARCIS (Netherlands)

    Duchhart, I.

    2000-01-01

    This training handbook is a result of the Environment and Urban Development Training Project. This project introduced participatory environmental planning for sustainable development of small and intermediate towns in Kenya. The human living environment was taken as the entry point.

  18. Environmental Assessment : Bear River Migratory Bird Refuge Hunt Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Environmental Assessment (EA) is designed to evaluate possible actions for modifying the Bear River Migratory Bird Refuge (Refuge) public hunt plan. The hunt...

  19. 76 FR 27344 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Science.gov (United States)

    2011-05-11

    ... National Park Service Water Resources Management Plan/Environmental Impact Statement, Mojave National... Prepare a Water Resources Management Plan/ Environmental Impact Statement for Mojave National Preserve... to inform preparation of a Water Resources Management Plan/Environmental Impact Statement...

  20. Fire Management Plan and Environmental Assessment 2001

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fire Management Plan outlines and details all of the refuge objectives for prescribed burns for the 1991 calendar year. It includes new fire management...

  1. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle's contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  2. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle`s contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  3. Near-facility environmental monitoring quality assurance project plan

    Energy Technology Data Exchange (ETDEWEB)

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  4. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  5. Master plan study - District heating Kohtla-Jaerve and Johvi municipalities. Estonia. Final report. Appendices for chapter 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to chapter nine of the final report of the master plan study on district heating in the municipalities of Kohtla-Jarve and Johvi municipalities (Estonia) present extensive data relating to economic, financial and environmental calculations, fuel consumption, energy balance and prices. (ARW)

  6. Environmental regulations handbook for enhanced oil recovery. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, T.D.

    1980-08-01

    A guide to environmental laws and regulations which have special significance for enhanced oil recovery (EOR) is presented. The Clean Air Act, the Clean Water Act, the Safe Drinking Water Act, Resource Conservation and Recovery Act, federal regulations, and state regulations are discussed. This handbook has been designed as a planning tool and a convenient reference source. The 16 states included comprise the major oil-producing states in various regions of the state. The major topics covered are: general guidelines for complying with environmental laws and regulations; air pollution control; water pollution control; protecting drinking water: underground injection control; hazardous waste management; and federal laws affecting siting or operation of EOR facilities. (DMC)

  7. Savannah River Site Environmental Implentation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    This report describes the organizational responsibilities for the Savannah River Site Environmental program. Operations, Engineering and projects, Environment, safety, and health, Quality assurance, and the Savannah River Laboratory are described.

  8. Integrating spatio-temporal environmental models for planning ski runs

    NARCIS (Netherlands)

    Pfeffer, Karin

    2003-01-01

    The establishment of ski runs and ski lifts, the action of skiing and maintenance of ski runs may cause considerable environmental impact. Clearly, for improvements to be made in the planning of ski runs in alpine terrain a good understanding of the environmental system and the response of environme

  9. 10 CFR 51.118 - Final environmental impact statement-notice of availability.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a final environmental impact statement or any supplement to a final environmental impact statement, the appropriate NRC staff director...

  10. Openings and closures in the environmental planning horizon

    DEFF Research Database (Denmark)

    Vasström, Mikaela Lise

    , however, also affects socio-economic and cultural aspects, and creates contested claims between different types of nature values and interests. Current environmental planning has proved to generate conflict in relation to a wide variety of knowledge, steering, interest, and value facets between national......Sustainability is one of the most pressing concerns in our modern society. Nature protection or environmental planning can be understood as one societal answer to some of the ecological challenges of our “developed” society to secure particular nature values and areas. The regulation of nature...... boundary setting, risk assessment, and interest negotiation. Participatory nature protection planning is not only a question of procedural legitimacy, but also a matter of deliberating different nature-society rationalities in order to improve the substantial ground for environmental planning trajectories...

  11. Final environmental impact statement. Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described. (DMC)

  12. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  13. Puget Sound area electric reliability plan. Draft environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  14. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  15. Environmental Monitoring Plan: Environmental Monitoring Section. Appendix A, Procedures

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    This document presents information about the environmental monitoring program at Lawrence Livermore National Laboratory. Topics discussed include: air sampling; air tritium calibrations; storm water discharge; non-storm water discharge; sampling locations; ground water sampling; noise and blast forecasting; analytical laboratory auditing; document retention; procedure writing; quality assurance programs for sampling; soil and sediment sampling; sewage sampling; diversion facility tank sampling; vegetation and foodstuff sampling; and radiological dose assessments.

  16. 76 FR 19744 - Final Tropic to Hatch 138 kV Transmission Line Project Environmental Impact Statement and...

    Science.gov (United States)

    2011-04-08

    ... Forest Service Final Tropic to Hatch 138 kV Transmission Line Project Environmental Impact Statement and Proposed Grand Staircase-Escalante National Monument Management Plan Amendment AGENCY: Forest Service, USDA... Forest, USDA Forest Service, Tropic to Hatch 138kV Transmission Line Project EIS Project Leader, 1789...

  17. Final Work Plan: Phase I Investigation at Bladen, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division. Applied Geosciences and Environmental Management Section; Yan, Eugene [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division

    2014-07-01

    The village of Bladen is a town of population approximately 237 in the northwest part of Webster County, Nebraska, 30 mi southwest of Hastings and 140 mi southwest of Lincoln, Nebraska. In 2000, the fumigant-related compound carbon tetrachloride was detected in public water supply well PWS 68-1, at a trace level. Low-level contamination, below the maximum contamination level (MCL) of 5.0 μg/L, has been detected intermittently in well PWS 68-1 since 2000, including in the last sample taken in July 2013. In 2006, the village installed a new well, PWS 2006-1, that remains free of contamination. Because the carbon tetrachloride found in well PWS 68-1 might be linked to historical use of fumigants containing carbon tetrachloride at grain storage facilities, including its former facility in Bladen, the CCC/USDA is proposing an investigation to (1) delineate the source and extent of the carbon tetrachloride contamination potentially associated with its former facility, (2) characterize pathways and controlling factors for contaminant migration in the subsurface, and (3) establish a basis for estimating potential health and environmental risks. The work will be performed in accordance with the Intergovernmental Agreement established between the NDEQ and the Farm Service Agency of the USDA. The site investigation at Bladen will be implemented in phases, so that data collected and interpretations developed during each phase can be evaluated to determine if a subsequent phase of investigation is warranted and, if warranted, to provide effective guidance for the subsequent investigation activities. This Work Plan identifies the specific technical objectives and defines the scope of work proposed for the Phase I investigation by compiling and evaluating historical data. The proposed investigation activities will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research

  18. Environmental development plan for transportation programs: FY80 update

    Energy Technology Data Exchange (ETDEWEB)

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  19. 75 FR 37790 - Lauryl Sulfate Salts; Antimicrobial Registration Review Final Work Plan and Proposed Registration...

    Science.gov (United States)

    2010-06-30

    ... AGENCY Lauryl Sulfate Salts; Antimicrobial Registration Review Final Work Plan and Proposed Registration.... SUMMARY: This notice announces the availability of EPA's final work plan and proposed registration review... with the posting of a summary document, containing a preliminary work plan, for public comment....

  20. 77 FR 74688 - Final Recovery Plan, First Revision; Mexican Spotted Owl

    Science.gov (United States)

    2012-12-17

    ... Fish and Wildlife Service Final Recovery Plan, First Revision; Mexican Spotted Owl AGENCY: Fish and... Service, announce the availability of our final recovery plan, first revision, for the Mexican Spotted Owl... and threatened wildlife and plants. ADDRESSES: If you wish to view the recovery plan, you may obtain...

  1. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

  2. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  3. 75 FR 22829 - National Environmental Policy Act; Final Environmental Impact Statement on U.S. Coast Guard...

    Science.gov (United States)

    2010-04-30

    ... SECURITY Coast Guard National Environmental Policy Act; Final Environmental Impact Statement on U.S. Coast... Environmental Impact Statement (FEIS) to implement enhanced environmental protection measures, as necessary, for... potential environmental impacts of specific Coast Guard vessel and aircraft operations on MPS and MPAs...

  4. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report Exhibits.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d` Alene tribe.

  5. Environmental Release Prevention and Control Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mamatey, A.; Arnett, M.

    1997-10-01

    During the history of SRS, continual improvements in facilities, process, and operations, and changes in the site`s mission have reduced the amount of radioactive liquid releases. In the early years of SRS (1958 to 1965), the amount of tritium discharged to the Savannah River averaged approximately 61,000 curies a year. During the mid-1980`s (1983 to 1988), liquid releases of tritium averaged 27,000 curies a year. By 1996, liquid releases of tritium are projected to be just 3000 curies for the year. This large projected decrease is the result of the planned shut-down of all reactors and the anticipated significant decline in the amount of tritium migrating from the site seepage basins and the Solid Waste Disposal Facility.

  6. 78 FR 7450 - Final Environmental Impact Statement for Protecting and Restoring Native Ecosystems by Managing...

    Science.gov (United States)

    2013-02-01

    ... National Park Service Final Environmental Impact Statement for Protecting and Restoring Native Ecosystems... a Final Environmental Impact Statement for Protecting and Restoring Native Ecosystems by Managing... a manner that supports long-term ecosystem protection, supports natural ecosystem recovery and...

  7. San Joaquin River National Wildlife Refuge: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on San Joaquin River NWR for the next 15 years. This plan outlines the Refuge vision and...

  8. Final San Andres National Wildlife Refuge Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on San Andres NWR for the next 15 years. This plan outlines the Refuge vision and purpose...

  9. Kern and Pixley National Wildlife Refuges: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Kern and Pixley NWRs for the next 15 years. This plan outlines the refuges' vision and...

  10. Assabet River National Wildlife Refuge: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Assabet River NWR for the next 15 years. This plan outlines the Refuge vision and...

  11. San Pablo Bay National Wildlife Refuge: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on San Pablo Bay NWR for the next 15 years. This plan outlines the Refuge vision and...

  12. Oxbow National Wildlife Refuge: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Oxbow NWR for the next 15 years. This plan outlines the Refuge vision and purpose and...

  13. Seal Beach National Wildlife Refuge: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Seal Beach NWR for the next 15 years. This plan outlines the Refuge vision and purpose...

  14. Great Meadows National Wildlife Refuge: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Great Meadows NWR for the next 15 years. This plan outlines the Refuge vision and...

  15. Iowa Wetland Management District: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Iowa Wetland Management District for the next 15 years. This plan outlines the Refuge...

  16. DeSoto National Wildlife Refuge: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Desoto NWR for the next 15 years. This plan outlines the Refuge vision and purpose and...

  17. South Bay Salt Ponds Restoration Project : Final Data Acquisition Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document provides the Data Acquisition Plan for the South Bay Salt Pond Restoration Project. The purpose of the Data Acquisition Plan is to guide the collection...

  18. Maine Coastal Islands National Wildlife Refuge: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Maine Coastal Islands National Wildlife Refuge for the next 15 years. This plan...

  19. Nisqually National Wildlife Refuge: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Nisqually NWR for the next 15 years. This plan outlines the Refuge vision and purpose...

  20. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    GREAGER, T.M.

    1999-09-09

    The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP.

  1. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    GREAGER, T.M.

    1999-12-14

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP).

  2. Environmental Monitoring Plan for the Oak Ridge Reservation, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, Sharon D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-10-01

    The purpose of Oak Ridge Reservation (ORR) environmental surveillance is to characterize radiological and nonradiological conditions of the off-site environs and estimate public doses related to these conditions, confirm estimations of public dose based on effluent monitoring data, and, where appropriate, provide supplemental data to support compliance monitoring for applicable environmental regulations. This environmental monitoring plan (EMP) is intended to document the rationale, frequency, parameters, and analytical methods for the ORR environmental surveillance program and provides information on ORR site characteristics, environmental pathways, dose assessment methods, and quality management. ORR-wide environmental monitoring activities include a variety of media including air, surface water, vegetation, biota, and wildlife. In addition to these activities, site-specific effluent, groundwater, and best management monitoring programs are conducted at the Oak Ridge National Laboratory (ORNL), the Y-12 National Security Complex (Y-12), and the East Tennessee Technology Park (ETTP). This is revision 5.

  3. 78 FR 28873 - Availability of Final Environmental Assessment and Finding of No Significant Impact for the...

    Science.gov (United States)

    2013-05-16

    ... of availability. SUMMARY: This notice announces the availability of a Final Environmental Assessment (Final EA) which examines the reasonably foreseeable environmental impacts and socio-economic impacts of... SECURITY Coast Guard Availability of Final Environmental Assessment and Finding of No Significant...

  4. 75 FR 1359 - Notice of Availability of Final Environmental Impact Statement for the Proposed Construction of...

    Science.gov (United States)

    2010-01-11

    ... Department of the Army; Corps of Engineers Notice of Availability of Final Environmental Impact Statement for...: Notice; extension of comment period. SUMMARY: The comment period for the Final Environmental Impact... Web version of the Final Environmental Impact Statement had problems with the Web links. The...

  5. 10 CFR 51.90 - Final environmental impact statement-general.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-general. 51.90... Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.90 Final environmental impact statement—general. After receipt and consideration of comments requested pursuant to §§ 51...

  6. 10 CFR 51.92 - Supplement to the final environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Supplement to the final environmental impact statement. 51...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.92 Supplement to the final environmental impact statement. (a) If the proposed action has not been taken, the...

  7. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-Materials Licenses § 51.97 Final environmental impact statement—materials license. (a) Independent spent fuel storage installation (ISFSI...

  8. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning... known or suspected environmental contamination. (5) (6) Policy—planning—management—capacity building...

  9. Planning and Restoration of Environmental Values in Nigeria Dysfunctional Societies

    Directory of Open Access Journals (Sweden)

    J. O Basorun

    2013-04-01

    Full Text Available Urban centers in Nigeria are becoming dysfunctional – a situation that threatens ourenvironmental values. This study, examines the pattern, process and problems of thesesocieties which experience rapid urban development pressure on account of highpopulation growth and decentralization of governance in the form of states and localgovernment creations. The study adopts extensive review of literature and findings revealthat Nigeria records very high level of urbanization and pollution, lacks effective culturaland physical planning policies, mismanages its urban open spaces, without adequatepersonnel to plan and organize the urban environments. Recommendations were madeon ways of restoring these environmental values through effective planning of urbancenters in Nigeria.

  10. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  11. Blue Creek Winter Range : Wildlife Mitigation Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

  12. Final monitoring plan for site restoration at Murdock, Nebraska.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2006-02-28

    In early 2005, Argonne National Laboratory conducted an Engineering Evaluation/Cost Analysis (EE/CA; Argonne 2005b) to address carbon tetrachloride contamination identified in groundwater and surface water at Murdock, Nebraska, approximately 22 mi east-northeast of Lincoln (Figure 1.1). The EE/CA study was performed for the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA), as the technical basis for a proposed removal action for the Murdock site. The EE/CA was conducted in compliance with an Administrative Order on Consent issued for Murdock by the U.S. Environmental Protection Agency (EPA 1991). Three removal action alternatives were examined through the use of site-specific data and predictive simulations of groundwater flow and contaminant transport performed with calibrated numerical models. The alternatives were evaluated individually and compared against performance criteria established under the National Oil and Hazardous Substances Pollution Contingency Plan and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). On the basis of these evaluations, an alternative employing phytoremediation in conjunction with seasonal groundwater extraction and treatment by spray irrigation was recommended by the CCC/USDA to permanently reduce the carbon tetrachloride contaminant levels in groundwater and surface water at the site. The proposed alternative is being implemented in cooperation with the EPA. Under the direction of the CCC/USDA and the EPA, implementation of the chosen removal action occurred in phases, beginning in April 2005. Installation of all the required remediation systems was completed by the end of August 2005. Specific technical objectives of the removal action are as follows: (1) To eliminate pathways for potential human exposure to carbon tetrachloride concentrations above the regulatory limit of 44.2 {micro}g/L in surface water at the site. (2) To minimize or eliminate any detrimental

  13. Predicting People's Environmental Behaviour: Theory of Planned Behaviour and Model of Responsible Environmental Behaviour

    Science.gov (United States)

    Chao, Yu-Long

    2012-01-01

    Using different measures of self-reported and other-reported environmental behaviour (EB), two important theoretical models explaining EB--Hines, Hungerford and Tomera's model of responsible environmental behaviour (REB) and Ajzen's theory of planned behaviour (TPB)--were compared regarding the fit between model and data, predictive ability,…

  14. Predicting People's Environmental Behaviour: Theory of Planned Behaviour and Model of Responsible Environmental Behaviour

    Science.gov (United States)

    Chao, Yu-Long

    2012-01-01

    Using different measures of self-reported and other-reported environmental behaviour (EB), two important theoretical models explaining EB--Hines, Hungerford and Tomera's model of responsible environmental behaviour (REB) and Ajzen's theory of planned behaviour (TPB)--were compared regarding the fit between model and data, predictive ability,…

  15. Y-12 Site environmental protection program implementation plan (EPPIP)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

  16. Final Report for the Soboba Strategic Tribal Energy Planning Project

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Kim [EPA Specialist

    2013-09-17

    In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.

  17. 77 FR 14568 - Environmental Impact Statement for Proposed General Management Plan, Pinnacles National Monument...

    Science.gov (United States)

    2012-03-12

    ... analysis for this general management planning effort. SUPPLEMENTARY INFORMATION: This new GMP will update... planning process to date, the NPS planning team developed four preliminary alternatives for the management... National Park Service Environmental Impact Statement for Proposed General Management Plan,...

  18. Openings and closures in the environmental planning horizon

    DEFF Research Database (Denmark)

    Vasström, Mikaela Lise

    , however, also affects socio-economic and cultural aspects, and creates contested claims between different types of nature values and interests. Current environmental planning has proved to generate conflict in relation to a wide variety of knowledge, steering, interest, and value facets between national...... protection or sustainability in a broader scope than the establishment of wild reindeer habitat protection boundaries. The thesis argues that nature protection planning, as an answer to societal sustainability challenges, requires broad public participation to deliberate nature-society trajectories beyond......Sustainability is one of the most pressing concerns in our modern society. Nature protection or environmental planning can be understood as one societal answer to some of the ecological challenges of our “developed” society to secure particular nature values and areas. The regulation of nature...

  19. Strategic environmental assessment implementation of transport and mobility plans. The case of Italian regions and provinces

    Directory of Open Access Journals (Sweden)

    Andrea De Montis

    2016-06-01

    Full Text Available Transport and mobility plans imply strategies and actions that affect the environment. The European Union has introduced in 2001 the strategic environmental assessment (SEA to take into account and mitigate adverse environmental effects in planning and decision-making. SEA limited implementation has attracted the interest of many scholars that have sought methods able to assess the quality of SEA processes by identifying vices and virtues in practice. In this paper, we measure the quality of eight SEAs for transport and mobility plans of regional and provincial administrations of Italy. Results show that the overall quality level of SEA reports is only barely sufficient, Abruzzo is among the virtuous and Piedmont among the critical administrations. We also stress that the determination of impact significance has received the worse quality score. We finally compare our results to other Italian and British homologous cases finding interesting and generally confirmative evidences.

  20. Efficient energy utilization and environmental issues applied to power planning

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, Hector, E-mail: hcampbellr@gmail.com [Instituto de Ingenieria, Universidad Autonoma de Baja California, Blvd Benito Juarez y calle de la Normal, Col Insurgentes Este, CP 21280, Mexicali, B.C., Mexico, P.O. Box 3439, Calexico, CA 92232 (United States); Montero, Gisela; Perez, Carlos [Instituto de Ingenieria, Universidad Autonoma de Baja California, Blvd Benito Juarez y calle de la Normal, Col Insurgentes Este, CP 21280, Mexicali, B.C., Mexico, P.O. Box 3439, Calexico, CA 92232 (United States); Lambert, Alejandro [Facultad de Ingenieria, Universidad Autonoma de Baja California, Blvd Benito Juarez y calle de la Normal, Col Insurgentes Este, CP 21280, Mexicali, B.C. (Mexico)

    2011-06-15

    This document shows the importance of policies for electric energy savings and efficient energy utilization in power planning. The contributions of economic, social, and environmental items were evaluated according to their financial effects in the delay of investments, reduction of production costs and decrement of environmental emissions. The case study is Baja California, Mexico; this system has a unique primary source: geothermal energy. Whether analyzing the planning as usual or planning from the supply side, the forecast for 2005-2025 indicates that 4500 MW additional installed capacity will be required (3-times current capacity), representing an investment that will emit 12.7 Mton per year of CO{sub 2} to the atmosphere and will cost US$2.8 billion. Systemic planning that incorporates polices of energy savings and efficiency allows the reduction of investments and pollutant emissions. For example, a reduction of 20% in the growth trend of the electricity consumption in the industrial customers would save US$10.4 billion over the next 20 years, with a potential reduction of 1.6 Mton/year of CO{sub 2}. The increase in geothermal power generation is also attractive, and it can be combined with the reduction of use and energy losses of utilities, which would save US$13.5 billion and prevent the discharge of 8.5 Mton/year of CO{sub 2}. - Highlights: > We contrast power planning methods for supply electricity for economy development. > Importance of policies for electricity savings and efficient use in power planning. > Systemic planning facilitates decision-making process for electricity optimization. > Supply-side planning will cause climb in prices and loss of energy self-sufficiency. > Power planning should be immersed in an environment of appropriate energy policies.

  1. ORNL long-range environmental and waste management plan

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  2. Master Environmental Plan: Fort Wingate Depot Activity, Gallup, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Biang, C.A.; Yuen, C.R.; Biang, R.P.; Antonopoulos, A.A.; Ditmars, J.D.

    1990-12-01

    The master environmental plan is based on an environmental assessment of the areas requiring environmental evaluation (AREEs) at Fort Wingate Depot Activity near Gallup, New Mexico. The Fort Wingate Depot Activity is slated for closure under the Base Closure and Realignment Act, Public Law 100--526. The MEP assesses the current status, describes additional data requirements, recommends actions for the sites, and establishes a priority order for actions. The plan was developed so that actions comply with hazardous waste and water quality regulations of the State of New Mexico and applicable federal regulations. It contains a brief history of the site, relevant geological and hydrological information, and a description of the current status for each AREE along with a discussion of the available site-specific data that pertain to existing or potential contamination and the impact on the environment. 35 refs., 27 figs., 23 tabs.

  3. Climate Change: Implications for the Assumptions, Goals and Methods of Urban Environmental Planning

    Directory of Open Access Journals (Sweden)

    Kristina Hill

    2016-12-01

    -based quantitative models of regional system behavior that may soon be used to determine acceptable land uses. Finally, the philosophical assumptions that underlie urban environmental planning are changing to address new epistemological, ontological and ethical assumptions that support new methods and goals. The inability to use the past as a guide to the future, new prioritizations of values for adaptation, and renewed efforts to focus on intergenerational justice are provided as examples. In order to represent a genuine paradigm shift, this review argues that changes must begin to be evident across the underlying assumptions, conceptual frameworks, and methods of urban environmental planning, and be attributable to the same root cause. The examples presented here represent the early stages of a change in the overall paradigm of the discipline.

  4. Climate Change: Implications for the Assumptions, Goals and Methods of Urban Environmental Planning

    Directory of Open Access Journals (Sweden)

    Kristina Hill

    2016-12-01

    -based quantitative models of regional system behavior that may soon be used to determine acceptable land uses. Finally, the philosophical assumptions that underlie urban environmental planning are changing to address new epistemological, ontological and ethical assumptions that support new methods and goals. The inability to use the past as a guide to the future, new prioritizations of values for adaptation, and renewed efforts to focus on intergenerational justice are provided as examples. In order to represent a genuine paradigm shift, this review argues that changes must begin to be evident across the underlying assumptions, conceptual frameworks, and methods of urban environmental planning, and be attributable to the same root cause. The examples presented here represent the early stages of a change in the overall paradigm of the discipline.

  5. Final Environmental Assessment: For the Eglin Dormitory Master Plan

    Science.gov (United States)

    2006-03-01

    then applied to the following factors depending on the corresponding years. Year 2005 through 2009: VOCE = .016 * Trips NOxE = .015 * Trips Appendix...Year 2010 and beyond: VOCE = .012 * Trips NOxE = .013 * Trips PM10E = .0022 * Trips OE = .262 * Trips E = emissions To convert from pounds per...day to tons per year: VOC (tons/yr) = VOCE * DPYII/2000 Nox (tons/yr) = NOxE * DPYII/2000 PM10(tons/yr) = PM10E * DPYII/2000 CO (tons/yr) = COE

  6. Puget Sound Area Electric Reliability Plan : Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-04-01

    A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, and during certain conditions, there is more demand for power in the Puget Sound area than the transmission system and existing generation can reliably supply. This high demand, called peak demand occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both.

  7. Final Environmental Planning Technical Report. Public Services and Facilities

    Science.gov (United States)

    1984-06-01

    modifications or additions will be made to 11 existing buildings. Approximately 400,000 square feet of floor space will be built or modified. A new road...capacity and adequacy, to characterize the level of service delivery in the ROI. Library service parameters analyzed were facili- ties ( floor and shelf space...Occupations Diesel Mechanics Safety Education Early Childhood Secretary Development Waiter- Waitress Welding-Gas, Arc, Heliarc University Parallel Areas

  8. Peterson Air Force Base Transportation Plan Final Environmental Assessment

    Science.gov (United States)

    2013-03-01

    migratory transient Whooping Crane Grus Americana FE, SE No permanent habitat on Base but may migrate through area Western Burrowing owl Athene...burrowing owl (Athene cunicularia), and the ferruginous hawk (Buteo regalis). The mountain plover (Charadrius montanus) is found in nearby southern and...3.6.1 Noise Descriptors The decibel (dB) is the unit used to quantify the intensity of sound throughout all frequencies. However, the human ear

  9. Final Environmental Assessment for Planned Growth Hulrburd Field, Florida

    Science.gov (United States)

    2009-08-01

    microfossiliferous (foraminiferal) limestone and grayish, poorly consolidated, sandy, clayey, sediment with abundant shell material Bruce Creek Limestone 475... Banana Shrub Fragrant flowers. Nerium oleander Oleander Tough evergreen, blooms all summer. Osmanthus fragrans Tea Olive Very fragrant blooms in

  10. Environmental management requirements/defensible costs project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  11. How Do Primary Pre-Service Teachers in a Regional Australian University Plan for Teaching, Learning and Acting in Environmentally Responsible Ways?

    Science.gov (United States)

    Gooch, Margaret; Rigano, Donna; Hickey, Ruth; Fien, John

    2008-01-01

    Integrated unit plans with an environmental focus can provide opportunities for school students to develop critical thinking skills, and to act in responsible ways--that is, to develop "action competence". In this study, environmentally focused integrated unit plans, developed and implemented by final year pre-service teachers at an Australian…

  12. Least-cost utility planning consumer participation manual. [Final report

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, C.; Wellinghoff, J.; Goldberg, F.

    1989-12-31

    This manual is designed to provide guidance to state consumer advocates and other state consumer groups interested in either initiating and/or participating in an Least-Cost Utility Planning (LCUP) process in their state. Least cost utility planning examined primarily as a regulatory framework to be implemented by an appropriate state authority -- usually the public utility commission -- for the benefit of the state`s citizens and electric utility customers. LCUP is also a planning process to be used by investor owned and public utilities to select, support and justify future expenditures in resource additions. This manual is designed as a ``How-To`` manual for implementing and participating in a statewide LCUP process. Its goal is to guide the reader through the LCUP maze so that meaningful, forward-looking, and cost minimizing electric utility planning can be initiated and sustained in your state.

  13. Final Work Plan: Targeted Investigation at York, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.

  14. Ohio River Islands National Wildlife Refuge: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) has been prepared for Ohio River Islands National Wildlife Refuge. The CCP is a management tool to be used by the Refuge...

  15. Strategic plan for Hanford Site Environmental Restoration Information Management

    Energy Technology Data Exchange (ETDEWEB)

    Cowley, P.J.; Beck, J.E.; Gephart, R.E. [and others

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

  16. Standby Energy Conservation Plan No. 2: Building Temperature Restrictions Plan. Environmental report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-02-01

    This report analyzes the environmental impacts of the proposed Building Temperature Restrictions Plan. The Plan would result in fuel and energy savings which could be diverted to other areas. Environmental impacts, with emphasis on air quality, were analyzed and found to result in a very minor improvement in air quality. Public health impacts are also minimal, and although some individuals may experience discomfort, it can be minimized by adjustments in clothing. The change in temperature is insufficient to have any significant impact on persons suffering from most diseases.

  17. Wildlife Protection, Mitigation, and Enhancement Plan, Palisades Project: Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Meuleman, G. Allyn

    1986-11-01

    Under direction of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 and the subsequent Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, projects have been developed in Idaho and Wyoming to mitigate the losses of wildlife habitat and annual production due to the development and operation of the Palisades Project. A modified Habitat Evaluation Procedure (HEP) was used to assess the benefits of the preferred mitigation plan to wildlife. The interagency work group used the target species Habitat Units (HU's) lost with inundation of the reservoir area as a guideline during the mitigation planning process, while considering needs of wildlife in eastern Idaho and western Wyoming. A total of 37,068 HU's were estimated to be lost as a result of the inundation of the Palisades Reservoir area. Through a series of protection/enhancement projects, the preferred mitigation plan will provide benefits of an estimated 37,066 HU's. Target species to be benefited by this mitigation plan include bald eagle, mule deer, elk, mallard, Canada goose, mink, yellow warbler, black-capped chickadee, ruffed grouse, and peregrine falcon.

  18. BNL ENVIRONMENTAL MONITORING PLAN TRIENNIAL UPDATE, JANUARY 2003.

    Energy Technology Data Exchange (ETDEWEB)

    BROOKHAVEN NATIONAL LABORATORY

    2003-01-01

    Brookhaven National Laboratory (BNL) is a multi-program national laboratory operated by Brookhaven Science Associates for the U.S. Department of Energy (DOE) and is located on a 5,265-acre site in Suffolk County, Long Island, New York. BNL has a comprehensive Environmental Management System (EMS) in place, which meets the requirements of the International Organization for Standardization 14001 EMS Standard, as described in the BNL EMS Manual. BNL's extensive environmental monitoring program is one component of the EMS, and the BNL Environmental Monitoring Plan (EMP) describes this program in detail. The data derived from systematically monitoring the various environmental media on site enable BNL to make informed decisions concerning the protection of human health and the environment and to be responsive to community concerns.

  19. Environmental Development Plan for Transportation Energy Conservation. FY 79 update

    Energy Technology Data Exchange (ETDEWEB)

    Singh, M. K.; Bernard, III, M. J.

    1978-12-15

    This is the first annual update of the Environment Development Plan (EDP) for the DOE Division of Transportation Energy Conservation program. It identifies the ecosystem, resource, physical environment, health, safety, and socioeconomic concerns associated with the division's transportation programs. These programs include the research, development, demonstration and assessment (RDD and A) of seventeen transportation technologies and several strategy and policy development and implementation projects. The transportation technologies projects deal with highway transport including electric vehicles, marine transport and pipeline transport. This EDP presents a research and assessment plan for resolving any potentially adverse environmental concerns stemming from these programs.

  20. Strategic environmental assessment for local transport plans; Strategische Umweltpruefung in der kommunalen Verkehrsentwicklung

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, Vera

    2008-08-15

    The strategic environmental assessment (SEA) makes new demands for plans and programs also in the transport sector. Particularly on local level transport is one of the biggest causers of negative environmental effects. But there exists no SEA obligation for local transport plans, however many factors suggest to make such an examination in this sector. At the latest in the urban land use planning transport effects are a component for the SEA. Synergies can be exhausted and the individual planning steps are appropriately co-ordinated by the meaningful integration of transport and urban development planning. Additional synergies can gained in connection with further local and/or regional planning like e.g. the clean air planning or noise reduction planning. The aim of the doctoral thesis is to draft recommendations how to integrate the SEA into local transport planning process. For that purpose it is necessary to deduce the requirements demanded by the SEA and to demonstrate the current state of the local transport planning. The doctoral thesis is based on partial results of the research project FE 73.0237 ''Strategische Umweltpruefung in der kommunalen Verkehrsentwicklungsplanung'' in behalf of the German Ministry of Transport (Bundesministerium fuer Verkehr, Bauen und Stadtentwicklung) and mentored by the Federal Office of civil engineering (Bundesamt fuer Bauwesen und Raumordnung). The author of this thesis was instrumental in acquiring those results. The thesis contains a detailed literature research. The SEA's requirements are also described as well as the current state of the local transport planning. The state of the SEA on the different planning levels in the German transport sector is presented. Another part is a survey of 13 municipalities concerning their previous practice of the local transport and environmental planning as well as their experience with the SEA on local level and the analyse of local data. Furthermore three

  1. 77 FR 39503 - Notice of Availability of the Final Environmental Impact Statement, Proposed Rawlins Resource...

    Science.gov (United States)

    2012-07-03

    ... Madre (CCSM) Wind Energy Project (Volume II) Final Environmental Impact Statement (EIS), and by this... direct, indirect and cumulative environmental impacts of constructing and operating the CCSM wind... Bureau of Land Management Notice of Availability of the Final Environmental Impact Statement,...

  2. 75 FR 21343 - Notice of Availability of the Final Environmental Impact Statement for the Round Mountain...

    Science.gov (United States)

    2010-04-23

    ...: 14X5017] Notice of Availability of the Final Environmental Impact Statement for the Round Mountain... prepared a Final Environmental Impact Statement (EIS) for the Round Mountain Expansion Project and by this... the Federal Register. ADDRESSES: Copies of the Round Mountain Expansion Project Final EIS...

  3. 77 FR 74472 - Notice of Availability of the Final Tank Closure and Waste Management Environmental Impact...

    Science.gov (United States)

    2012-12-14

    ... of Availability of the Final Tank Closure and Waste Management Environmental Impact Statement for the... Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Final TC... and mixed low-level radioactive waste. The final EIS also includes a No Action Alternative to the...

  4. 78 FR 75913 - Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site...

    Science.gov (United States)

    2013-12-13

    ... Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland... addressed the Final Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact... in the following paragraphs. As stated in the Final TC&WM EIS, for the actions related to tank waste...

  5. Final Report - Development of a Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Maracas, Kate; Hooks, Todd

    2006-11-30

    The Agua Caliente Band of Cahuilla Indians was awarded a grant under the U.S. Department of Energy’s (“DOE”) Tribal Energy Program to develop a comprehensive Tribal energy plan. The grant, awarded under DOE’s First Steps program, supported the development of a strategic energy plan that integrates with the Tribe’s overall planning and economic development goals, and aligns with Tribal cultural, social, political, and spiritual values. The Tribe set out to incorporate its energy plan into (i) a broader economic development strategy developed by investigators at the University of California at Riverside, and (ii) the overarching goals for job-creation and wealth-creation that are held by both the Tribe and the surrounding Coachella Valley. With these wide-ranging objectives in mind, the Tribe and its consultant, Red Mountain Energy Partners, engaged in a phased approach to creating the strategic energy plan. As illustrated in Figure 1 below, the proposed approach involved both “serial” and “parallel” activities. The capacity-building component of this approach occurred throughout the duration of the project period.

  6. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a... cost of such activities under §§ 1003.201 through 1003.204. (b) Policy—planning—management—capacity...

  7. Cokeville Meadows National Wildlife Refuge Proposal : Final Environmental Impact Statement

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This environmental document assesses the potential environmental effects of establishment of a national wildlife refuge for the primary purpose of preserving and...

  8. Final Environmental Assessment for the CV-22 Interim Beddown

    Science.gov (United States)

    2016-04-01

    Experience : 16 Ann Slaughter, Environmental Analyst, HDR M.E.S. Environmental Policy and Science and Sustainable Development B.S. Chemistry Years...LPES, Inc. M.S., Civil and Environmental Engineering B.S., Mechanical Engineering Years of Experience : 25 Christopher McJetters, Technical Editor... Experience : 18 Steve Pyle, Esq. Senior NEPA Project Manager, HDR J.D. with Certification in Environmental Law B.S. Natural Resources Management Years of

  9. Urban and energy planning in Santiago de Compostela: Final Report

    OpenAIRE

    Fernandez Maldonado, A.M.

    2015-01-01

    The purpose of Deliverable 4.2 is to give an overview of urban energy planning in the six PLEEC partner cities. The six reports illustrate how cities deal with different challenges of the urban energy transformation from a structural perspective including issues of urban governance and spatial planning. They will provide input for the following cross-thematic report (D4.3). Target group The main addressee is the WP4-teams (universities and cities) who will work on the cross-thematic report (D...

  10. Participatory Challenges in Urban-Environmental Planning: The Anthropological Contribution

    Directory of Open Access Journals (Sweden)

    Ariel Gravano

    2007-07-01

    Full Text Available This essay offers reflections on the anthropological contribution to institutional processes of “community participation” in urban-environmental planning in a metropolitan setting. The case presented is of a participation imposed by law, its difficulties and opportunities, from the different and asymmetrical rationalities in the game. Faced with a concrete demand from the State, we analyze methodological possibilities for adopting a process of effective transformation, through the facilitation of organizational culture issues.

  11. 2009 review of the Deep Panuke Environmental Effects Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Oceans, Habitat and Species at Risk branch of the Department of Fisheries and Oceans Canada requested an update to the Environmental Management Plan for the construction of the Deep Panuke Project. Specifically, it requested expert advice on the 2009-2010 Drilling Environmental Protection Plan/Environmental Effects Monitoring Plan (EPP/EEMP), which outlines the measures that EnCana proposes take to avoid or minimize the effects of drilling in the marine environment. Although the proposed approach was deemed to be sufficient, the EPP/EEMP did not make reference to the potential effects of noise on marine species. The jack-up rig mobile offshore production unit that is proposed for well drilling and well re-entries was considered to produce lower noise levels than drillships and semi submersibles. It was concluded that jack up drilling at Deep Panuke would not likely require special noise mitigation measures, but more extensive measurement and documentation of acoustic noise levels around active rigs is recommended. The risk of well blowout or collapse was deemed low. Should such an event occur, the impact of the released hydrocarbon condensate would depend on the rate and duration of the release. Under typical conditions, the proponent's models reasonably show the blowout discharge drifting away from Sable Island. However, there is a very low risk that certain weather conditions would result in an oil spill reaching Sable Island. The EPP/EEMP does not address species at risk in any way, and mitigation measures are required and should be detailed in the monitoring plan. It was concluded that the proposed EPP/EEMP is sufficient in many areas, but since most mitigation measures are based on theoretical considerations alone, a plan for field monitoring at the drilling site is needed. 3 refs.

  12. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    GREAGER, T.M.

    2000-12-06

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility.

  13. Urban and energy planning in Santiago de Compostela: Final Report

    NARCIS (Netherlands)

    Fernandez Maldonado, A.M.

    2015-01-01

    The purpose of Deliverable 4.2 is to give an overview of urban energy planning in the six PLEEC partner cities. The six reports illustrate how cities deal with different challenges of the urban energy transformation from a structural perspective including issues of urban governance and spatial plann

  14. 76 FR 40394 - Final Plan for Fiscal Year 2011

    Science.gov (United States)

    2011-07-08

    ... that meet the evaluation criteria, their descriptions, and performance indicators; and develop... justice, social services, and law enforcement to tap into the wisdom and energies of many others... intended to address, and propose plans for remediation of performance that does not meet standards. OJJDP...

  15. Urban and energy planning in Santiago de Compostela: Final Report

    NARCIS (Netherlands)

    Fernandez Maldonado, A.M.

    2015-01-01

    The purpose of Deliverable 4.2 is to give an overview of urban energy planning in the six PLEEC partner cities. The six reports illustrate how cities deal with different challenges of the urban energy transformation from a structural perspective including issues of urban governance and spatial plann

  16. Environmental sensitive road planning and transportation techniques in forest engineering

    Directory of Open Access Journals (Sweden)

    H. Hulusi Acar

    2016-07-01

    Full Text Available Forestry management has activities dealing with technical, economic, social and environmental services. Forestry operations which are carried out on forest areas , an important part of the ecosistem are materialized in open space. This forestry activities on large areas and high sloping generally, include many different techniques. It is needed primarily to the forest road network in terms of forest management. Determining the approriate route in the natural environment, planning and road construction affairs for forest roads which are necessary accessing in forest areas, is also of great importance from an environmental viewpoint as well as technical and economic manner. Forest road planning which can not be changed later and left a permanent mark on the natural environment carries much more importance to the environment especially on sloping land. This is because, it is important choosing correct type of roaf structure, and doing periodic maintenance of the roads. Skidding activities, after wood production, is important in terms of its impact on forest soil and by means of effects on saplings and trees on the releated forest areas.The development of environmental sensitive techniques is difficult, limited or expensive for this wood extraction works which are made more difficult conditons in the sloping terrain. Therefore, especially in using some silvicultural methods wood extraction damages are even greater. In this study; some road planning, road construction and wood extraction techniques which performed by me have been made to examine the environmental aspects. Environment-friendly forest roads and primary transport techniques on the forest ecosystem are briefly explained and discussed in the frame of the environmental aspects.

  17. Environmental Action Memorandum : [Ottawa and Cedar Point National Wildlife Refuges Fishery Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Environmental Action memorandum for the Ottawa and Cedar Point NWRs Fishery Management Plan states that the Plan is found not to have significant environmental...

  18. Developments in economic valuation of environmental resources in centrally planned economies.

    NARCIS (Netherlands)

    Mol, A.P.J.; Opschoor, J.B.

    1989-01-01

    Environmental policy in centrally planned economies is nowadays based mainly on administrative measures, such as licences and standards. The realisation of environmental targets by physical planning, management, and regulation alone, however, is falling short of expectations. For that reason, econom

  19. 76 FR 23335 - Wilderness Stewardship Plan/Environmental Impact Statement, Sequoia and Kings Canyon National...

    Science.gov (United States)

    2011-04-26

    ... proper food storage; party size; camping and campsites; human waste management; stock use; meadow... National Park Service Wilderness Stewardship Plan/Environmental Impact Statement, Sequoia and Kings Canyon... Intent to Prepare Environmental Impact Statement for Wilderness Stewardship Plan, Sequoia and...

  20. Environmental Action Memorandum : [Ottawa National Wildlife Refuge White-tailed Deer Hunting Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Environmental Action Memorandum for the proposed Ottawa NWR White-tailed Deer Hunting Plan states that the plan is found not to have significant environmental...

  1. Environmental Action Memorandum : [Walnut Creek National Wildlife Refuge Interim Hunting Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Environmental Action Memorandum for the Neal Smith NWR Interim Hunting Plan states that the plan is found to have special environmental considerations as...

  2. Environmental Action Statement : [Whittlesey Creek National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Environmental Action Statement for the Whittlesey Creek NWR Habitat Management Plan states that the plan is found not to have significant environmental effects.

  3. Using environmental heterogeneity to plan for sea-level rise.

    Science.gov (United States)

    Hunter, Elizabeth A; Nibbelink, Nathan P

    2017-02-27

    Environmental heterogeneity is increasingly being used to select conservation areas that will provide for future biodiversity under a variety of climate scenarios. This approach, termed conserving nature's stage (CNS), assumes environmental features respond to climate change more slowly than biological communities, but will CNS be effective if the stage were to change as rapidly as the climate? We tested the effectiveness of using CNS to select sites in salt marshes for conservation in coastal Georgia (U.S.A.), where environmental features will change rapidly as sea level rises. We calculated species diversity based on distributions of 7 bird species with a variety of niches in Georgia salt marshes. Environmental heterogeneity was assessed across six landscape gradients (e.g., elevation, salinity, and patch area). We used 2 approaches to select sites with high environmental heterogeneity: site complementarity (environmental diversity [ED]) and local environmental heterogeneity (environmental richness [ER]). Sites selected based on ER predicted present-day species diversity better than randomly selected sites (up to an 8.1% improvement), were resilient to areal loss from SLR (1.0% average areal loss by 2050 compared with 0.9% loss of randomly selected sites), and provided habitat to a threatened species (0.63 average occupancy compared with 0.6 average occupancy of randomly selected sites). Sites selected based on ED predicted species diversity no better or worse than random and were not resilient to SLR (2.9% average areal loss by 2050). Despite the discrepancy between the 2 approaches, CNS is a viable strategy for conservation site selection in salt marshes because the ER approach was successful. It has potential for application in other coastal areas where SLR will affect environmental features, but its performance may depend on the magnitude of geological changes caused by SLR. Our results indicate that conservation planners that had heretofore excluded low

  4. A methodology for evaluating environmental planning systems: a case study of Canada.

    Science.gov (United States)

    Ellis, Meghan; Gunton, Thomas; Rutherford, Murray

    2010-06-01

    Sustainable environmental management is contingent on having an effective environmental planning system. A new methodology for designing and evaluating environmental planning systems is described and applied to a case study evaluation of the Canadian environmental planning process. The methodology is based on eight international best practice principles for environmental planning and 45 indicators. The research illustrates the benefits of the evaluation methodology in identifying how to improve environmental planning systems to achieve desired results. The methodology is applicable to a wide variety of jurisdictions. (c) 2010. Published by Elsevier Ltd.

  5. Methodology development to support NPR strategic planning. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report covers the work performed in support of the Office of New Production Reactors during the 9 month period from January through September 1990. Because of the rapid pace of program activities during this time period, the emphasis on work performed shifted from the strategic planning emphasis toward supporting initiatives requiring a more immediate consideration and response. Consequently, the work performed has concentrated on researching and helping identify and resolve those issues considered to be of most immediate concern. Even though they are strongly interrelated, they can be separated into two broad categories as follows: The first category encompasses program internal concerns. Included are issues associated with the current demand for accelerating staff growth, satisfying the immediate need for appropriate skill and experience levels, team building efforts necessary to assure the development of an effective operating organization, ability of people and organizations to satisfactorily understand and execute their assigned roles and responsibilities, and the general facilitation of inter/intra organization communications and working relationships. The second category encompasses program execution concerns. These include those efforts required in development of realistic execution plans and implementation of appropriate control mechanisms which provide for effective forecasting, planning, managing, and controlling of on-going (or soon to be) program substantive activities according to the master integrated schedule and budget.

  6. 75 FR 21650 - Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2010-04-26

    ... National Park Service Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement... Availability of the Draft Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan... Environmental Impact Statement (DEIS) for the Coral Reef Restoration Plan for Biscayne National Park, Florida...

  7. 76 FR 50494 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Science.gov (United States)

    2011-08-15

    ... National Park Service Water Resources Management Plan/Environmental Impact Statement, Mojave National... Scoping Period for Water Resources Management Plan/Environmental Impact Statement for Mojave National... National Park Service is preparing a Water Resources Management Plan/Environmental Impact Statement...

  8. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  9. RTSTEP regional transportation simulation tool for emergency planning - final report.

    Energy Technology Data Exchange (ETDEWEB)

    Ley, H.; Sokolov, V.; Hope, M.; Auld, J.; Zhang, K.; Park, Y.; Kang, X. (Energy Systems)

    2012-01-20

    Large-scale evacuations from major cities during no-notice events - such as chemical or radiological attacks, hazardous material spills, or earthquakes - have an obvious impact on large regions rather than on just the directly affected area. The scope of impact includes the accommodation of emergency evacuation traffic throughout a very large area; the planning of resources to respond appropriately to the needs of the affected population; the placement of medical supplies and decontamination equipment; and the assessment and determination of primary escape routes, as well as routes for incoming emergency responders. Compared to events with advance notice, such as evacuations based on hurricanes approaching an affected area, the response to no-notice events relies exclusively on pre-planning and general regional emergency preparedness. Another unique issue is the lack of a full and immediate understanding of the underlying threats to the population, making it even more essential to gain extensive knowledge of the available resources, the chain of command, and established procedures. Given the size of the area affected, an advanced understanding of the regional transportation systems is essential to help with the planning for such events. The objectives of the work described here (carried out by Argonne National Laboratory) is the development of a multi-modal regional transportation model that allows for the analysis of different evacuation scenarios and emergency response strategies to build a wealth of knowledge that can be used to develop appropriate regional emergency response plans. The focus of this work is on the effects of no-notice evacuations on the regional transportation network, as well as the response of the transportation network to the sudden and unusual demand. The effects are dynamic in nature, with scenarios changing potentially from minute to minute. The response to a radiological or chemical hazard will be based on the time-delayed dispersion of

  10. Kenai National Wildlife Refuge Skilak Wildlife Recreation Area Revised Final Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purposes of this final management plan are: 1. To describe wildlife viewing, interpretation, and photography opportunities within the Skilak WRA; 2. To identify...

  11. Master plan study - District heating Sillamaee municipality. Estonia. Final report. Appendices for chapter 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to the final report on the master plan study on district heating in the municipality in Estonia, chapter nine, gives data related to general economic assumptions for financial and economic calculations, fuel consumption, financing, prices, fuel consumption. (ARW)

  12. Community Relations Plan for Lawrence Berkeley Laboratory. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    The Lawrence Berkeley Laboratory (LBL) has applied to the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC), for renewal of its Hazardous Waste Handling Facility Permit. A permit is required under Resource Conservation and Recovery Act (RCRA) regulations. The permit will allow LBL to continue using its current hazardous waste handling facility, upgrade the existing facility, and construct a replacement facility. The new facility is scheduled for completion in 1995. The existing facility will be closed under RCRA guidelines by 1996. As part of the permitting process, LBL is required to investigate areas of soil and groundwater contamination at its main site in the Berkeley Hills. The investigations are being conducted by LBL`s Environmental Restoration Program and are overseen by a number of regulatory agencies. The regulatory agencies working with LBL include the California Environmental Protection Agency`s Department of Toxic Substances Control, the California Regional Water Quality Control Board, the Bay Area Air Quality Management District, the East Bay Municipal Utilities District, and the Berkeley Department of Environmental Health. RCRA requires that the public be informed of LBL`s investigations and site cleanup, and that opportunities be available for the public to participate in making decisions about how LBL will address contamination issues. LBL has prepared this Community Relations Plan (CRP) to describe activities that LBL will use to keep the community informed of environmental restoration progress and to provide for an open dialogue with the public on issues of importance. The CRP documents the community`s current concerns about LBL`s Environmental Restoration Program. Interviews conducted between February and April 1993 with elected officials, agency staff, environmental organizations, businesses, site neighbors, and LBL employees form the basis for the information contained in this document.

  13. Standard review plan for dry cask storage systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    The Standard Review Plan (SRP) For Dry Cask Storage Systems provides guidance to the Nuclear Regulatory Commission staff in the Spent Fuel Project Office for performing safety reviews of dry cask storage systems. The SRP is intended to ensure the quality and uniformity of the staff reviews, present a basis for the review scope, and clarification of the regulatory requirements. Part 72, Subpart B generally specifies the information needed in a license application for the independent storage of spent nuclear fuel and high level radioactive waste. Regulatory Guide 3.61 {open_quotes}Standard Format and Content for a Topical Safety Analysis Report for a Spent Fuel Dry Storage Cask{close_quotes} contains an outline of the specific information required by the staff. The SRP is divided into 14 sections which reflect the standard application format. Regulatory requirements, staff positions, industry codes and standards, acceptance criteria, and other information are discussed.

  14. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Science.gov (United States)

    2010-07-01

    ... policy, signed by the University's senior management, which must include commitments to regulatory...) Policies and procedures for managing environmental documents and records applicable to this Environmental... identified in the Environmental Management Plan must be informed of relevant policies, procedures or...

  15. Final Environmental Assessment : Marais des Cygnes National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Environmental Assessment for the acquisition of approximately 9,300 acres known as Marais des Cygnes National Wildlife Refuge for the purpose of protecting...

  16. Environmental impacts of proposed Monitored Retrievable Storage. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1985-12-17

    This report describes environmental impacts from a proposed monitored retrievable storage facility for spent fuels to be located in Tennessee. Areas investigated include: water supply, ground water, air quality, solid waste management, and health hazards. (CBS)

  17. 78 FR 24228 - Lake Andes National Wildlife Refuge Complex, Lake Andes, SD; Final Comprehensive Conservation Plan

    Science.gov (United States)

    2013-04-24

    ... Fish and Wildlife Service Lake Andes National Wildlife Refuge Complex, Lake Andes, SD; Final Comprehensive Conservation Plan AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability... conservation plan and finding of no significant impact (FONSI) for the Lake Andes National Wildlife...

  18. 76 FR 66286 - Notice of Final 2010 Effluent Guidelines Program Plan

    Science.gov (United States)

    2011-10-26

    ... well, called ``produced water,'' like most ground water found deep below the surface of the earth, has... water for anywhere from 5 to 15 years. Coalbed methane wells have a distinctive production history... Program Plan(``final 2010 Plan''), which, as required under the Clean Water Act (CWA), identifies any...

  19. Environmental implications of increased biomass energy use. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Miles, T.R. Sr.; Miles, T.R. Jr. [Miles (Thomas R.), Portland, OR (United States)

    1992-03-01

    This study reviews the environmental implications of continued and increased use of biomass for energy to determine what concerns have been and need to be addressed and to establish some guidelines for developing future resources and technologies. Although renewable biomass energy is perceived as environmentally desirable compared with fossil fuels, the environmental impact of increased biomass use needs to be identified and recognized. Industries and utilities evaluating the potential to convert biomass to heat, electricity, and transportation fuels must consider whether the resource is reliable and abundant, and whether biomass production and conversion is environmentally preferred. A broad range of studies and events in the United States were reviewed to assess the inventory of forest, agricultural, and urban biomass fuels; characterize biomass fuel types, their occurrence, and their suitability; describe regulatory and environmental effects on the availability and use of biomass for energy; and identify areas for further study. The following sections address resource, environmental, and policy needs. Several specific actions are recommended for utilities, nonutility power generators, and public agencies.

  20. 77 FR 61632 - Final Environmental Impact Statement for Cattle Point Road Relocation, San Juan Island National...

    Science.gov (United States)

    2012-10-10

    ... National Park Service Final Environmental Impact Statement for Cattle Point Road Relocation, San Juan.... ACTION: Notice of Availability of the Final Environmental Impact Statement for Cattle Point Road... bluff erosion that threatens a segment of the Cattle Point Road located in San Juan Island...

  1. 75 FR 72836 - Notice of Availability of Final Environmental Impact Statement for the Tonopah Solar Energy...

    Science.gov (United States)

    2010-11-26

    ...: 14X5017] Notice of Availability of Final Environmental Impact Statement for the Tonopah Solar Energy Crescent Dunes Solar Energy Project, Nye County, NV AGENCY: Bureau of Land Management, Interior. ACTION... (BLM) has prepared a Final Environmental Impact Statement (EIS) for the Crescent Dunes Solar...

  2. 78 FR 32441 - Grand Ditch Breach Restoration, Final Environmental Impact Statement, Rocky Mountain National...

    Science.gov (United States)

    2013-05-30

    ... National Park Service Grand Ditch Breach Restoration, Final Environmental Impact Statement, Rocky Mountain... Availability of the Final Environmental Impact Statement for the Grand Ditch Breach Restoration, Rocky Mountain... Grand Ditch Breach Restoration, Rocky Mountain National Park, Colorado. DATES: The National Park...

  3. 76 FR 74074 - Final Environmental Impact Statement for the Windy Gap Firming Project, Colorado

    Science.gov (United States)

    2011-11-30

    ... Bureau of Reclamation Final Environmental Impact Statement for the Windy Gap Firming Project, Colorado AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The Final Environmental... construction and address any project impacts to waters of the United States and jurisdictional wetlands....

  4. Environmental assessment and planning at Mound - environmental monitoring capabilities and personnel profiles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    Through its long experience with radioactive materials, Mound has developed a comprehensive, routine, offsite, environmental surveillance program to safeguard its employees, the physical plant, and the integrity of the surrounding environment from any potential adverse effects of its widely diverse operations. Effluent samples are analyzed for radiological and non-radiological parameters. The environment surrounding Mound Facility is continuously monitored - air, water, foodstuffs, vegetation, soil, and silt samples are analyzed to ensure that radioisotopic concentrations and other possible pollutants are well within the stringent standards adopted by the Department of Energy, the Environmental Protection Agencies (both federal and state), and various regional and local agencies. Moreover, this environmental surveillance program has been designed to ensure that the facility is designed, constructed, managed, operated, and maintained in a manner that continues to meet all federal, state, and local standards for environmental protection. Work in environmental science has been broadened to assess environmental factors associated with various aspects of the National Energy Plan. Both the management and staff at Mound have undertaken a firm commitment to make Mound`s environmental monitoring capabilities available to agencies that have the responsibility for the resolution of important environmental issues.

  5. Using Multicriteria Methods in Environmental Planning and Management

    Science.gov (United States)

    Lahdelma, Risto; Salminen, Pekka; Hokkanen, Joonas

    2000-12-01

    In environmental planning and decision processes several alternatives are analyzed in terms of multiple noncommensurate criteria, and many different stakeholders with conflicting preferences are involved. Based on our experience in real-life applications, we discuss how multicriteria decision aid (MCDA) methods can be used successfully in such processes. MCDA methods support these processes by providing a framework for collecting, storing, and processing all relevant information, thus making the decision process traceable and transparent. It is therefore possible to understand and explain why, under several conflicting preferences, a particular decision was made. The MCDA framework also makes the requirements for new information explicit, thus supporting the allocation of resources for the process.

  6. An Integrated Decentralized Energy Planning Model considering Demand-Side Management and Environmental Measures

    Directory of Open Access Journals (Sweden)

    Seyed Mahmood Kazemi

    2013-01-01

    Full Text Available Decentralized energy planning (DEP is looked upon as an indisputable opportunity for energy planning of villages, isolated islands, and far spots. Nonetheless, at this decentralized planning level, the value of demand-side resources is not fairly examined, despite enjoying great advantages. Therefore, the core task of this study is to integrate demand-side resources, as a competing solution against supply-side alternatives, with decentralized energy planning decisions and demonstrate the rewarding role it plays. Moreover, sustainability indicators (SIs are incorporated into DEP attempts in order to attain sustainable development. It is emphasized that unless these indicators are considered at lower energy planning levels, they will be ignored at higher planning levels as well. Hence, to the best knowledge of the authors, this study for the first time takes into account greenhouse gas (GHG emissions produced by utilization of renewable energies in DEP optimization models. To address the issues mentioned previously, multiobjective linear programming model along with a min-max goal programming approach is employed. Finally, using data taken from the literature, the model is solved, and the obtained results are discussed. The results show that DSM policies have remarkably contributed to significant improvements especially in terms of environmental indicators.

  7. Ecological research on offshore wind energy development in the North and Baltic sea. Part: Environmental planning instruments: Environmental Impacts Assessment (EIA), Habitats Assessment and Strategic Environmetnal Assessment (SEA). Volumes 1-4 and final report; Oekologische Begleitforschung zur Windenergienutzung im Offshore-Bereich der Nord- und Ostsee. Teilbereich 'Instrumente des Umwelt- und Naturschutzes: Strategische Umweltpruefung, Umweltvertraeglichkeitspruefung und Flora-Fauna-Habitat-Vertraeglichkeitspruefung'. Band 1-4 und Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Koeppel, J.; Langenheld, A.; Peters, W.; Wende, W.; Sommer, S.; Finger, A.; Koeller, J.; Kraetzschmer, D.; Kerber, N.; Mahlburg, S.; Mueller, C.

    2003-07-01

    Within the licensing procedure of offshore wind farms several environmental planning instruments have to be taken into account to assess the probable effects of turbines on the marine environment. So far only little experiences were available on how to fulfil legal and methodical demands with regard to these environmental planning instruments offshore. Hence it was the principle task of this project to analyse how instruments like the environmental impacts assessment (EIA), the habitats assessment and the strategic environmental assessment (SEA) can be adapted to the special conditions of the marine environment and the legal requirements of the licensing procedure in the German EEZ according to the offshore installations ordinance. Since according to the offshore installations ordinance the construction and operation of offshore wind farms can only be refused for environmental reasons when the marine environment is endangered, the project first investigated for different aspects of the marine environment (e.g. marine mammals, birds, benthos, visual landscape) which kind of conflicts can possibly be caused by the construction and operation of turbines and of which legal significance they are with regard to the licensing procedure. Referring to those environmental impacts which have been considered as relevant for the licensing procedure the state of knowledge has been investigated by means of expert interviews and literature research. Practicable starting points for the impact assessment were suggested. With regard to the required environmental assessment within the licensing procedure one result of the project is a structured documentation of the standard of knowledge (volume I). Further on the project developed proposals for the application of the planning instruments EIA, habitats assessment and SEA offshore based on legal regulations. The result is a catalogue of requirements regarding the content and proceedings of the instruments implementation in connection

  8. Final Environmental Assessment: Hurlburt Field Skeet & Trap Club

    Science.gov (United States)

    2008-07-01

    Asparagus fern ( Asparagus aethiopicus) ● Camphor-tree (Cinnamomum camphora) ● Wild taro (Colocasia esculenta) ● Air potato (Dioscorea bulbifera...resource production , including oil and gas, and/or the transportation of oil and gas. Addresses regulation, planning, and development of oil and gas

  9. Final work plan for targeted investigation at Hilton, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-08-28

    This Work Plan outlines the scope of a targeted investigation to update the status of carbon tetrachloride contamination in groundwater associated with grain storage operations at Hilton, Kansas. The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility in Hilton during the 1950s and 1960s. At the time of the CCC/USDA operation in Hilton, grain storage facilities (CCC/USDA and private) were located along the both sides of the former Union Pacific railroad tracks (Figure 1.1). The main grain storage structures were on or near the railroad right-of-way. The proposed targeted investigation, to be conducted by Argonne National Laboratory on the behalf of CCC/USDA, will supplement Argonne's Phase I and Phase II investigations in 1996-1997. The earlier investigations erroneously focused on an area east of the railroad property where the CCC/USDA did not operate, specifically on a private grain storage facility. In addition, the investigation was limited in scope, because access to railroad property was denied (Argonne 1997a,b). The hydrogeologic system at Hilton is potentially complex.

  10. 75 FR 9924 - Final Comprehensive Conservation Plan for the Red Rock Lakes National Wildlife Refuge, MT

    Science.gov (United States)

    2010-03-04

    ... Fish and Wildlife Service Final Comprehensive Conservation Plan for the Red Rock Lakes National Wildlife Refuge, MT AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce that our final Comprehensive...

  11. Discrepancies between selected Pareto optimal plans and final deliverable plans in radiotherapy multi-criteria optimization.

    Science.gov (United States)

    Kyroudi, Archonteia; Petersson, Kristoffer; Ghandour, Sarah; Pachoud, Marc; Matzinger, Oscar; Ozsahin, Mahmut; Bourhis, Jean; Bochud, François; Moeckli, Raphaël

    2016-08-01

    Multi-criteria optimization provides decision makers with a range of clinical choices through Pareto plans that can be explored during real time navigation and then converted into deliverable plans. Our study shows that dosimetric differences can arise between the two steps, which could compromise the clinical choices made during navigation.

  12. Guidebook in using Cost Benefit Analysis and strategic environmental assessment for environmental planning in China

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    Environmental planning in China may benefit from greater use of Cost Benefit Analysis (CBA) and Strategic Environmental Assessment (SEA) methodologies. We provide guidance on using these methodologies. Part I and II show the principles behind the methodologies as well as their theoretical structure. Part III demonstrates the methodologies in action in a range of different good practice examples. The case studies and theoretical expositions are intended to teach by way of example as well as by understanding the principles, and to help planners use the methodologies as correctly as possible.(auth)

  13. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides

  14. Final work plan for targeted investigation at Inman, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-11-05

    In 1997, low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5 {micro}g/L) were detected in groundwater at Inman, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1997 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Inman from 1954 to 1965. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Inman is located in southwest McPherson County, approximately 10 mi southwest of the city of McPherson (Figure 1.1). To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation at Inman, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA. For this work plan, Argonne compiled historical data related to the previous investigations and grain storage operations at Inman. Through a review of documents acquired from all available sources, other potential contaminant source areas (in addition to the former CCC/USDA facility) have been identified as (1) the commercial grain storage structures northwest of Inman, along the railroad right-of-way, and (2) small former private grain storage facilities west of Main Street and near the former CCC/USDA facility at the southern edge of Inman (Figure 1.2). Previous investigations and the potential source areas are discussed in Section 2.

  15. Wildlife Protection, Mitigation, and Enhancment Plan: Minidoka Dam: Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Meuleman, G. Allyn; Martin, Robert C.; Hansen, H. Jerome

    1991-04-01

    A wildlife protection, mitigation, and enhancement plan has been developed for the US Bureau of Reclamation's Minidoka Dam and Reservoir in south-central Idaho. Specific objectives of this study included the following: Develop protection, mitigation, and enhancement goals and objectives for target wildlife species; identify potential protection, mitigation, and enhancement opportunities to achieve the mitigation objectives; and coordinate project activities with agencies, tribes, and the public. The interagency work group previously assessed the impacts of Minidoka Dam on wildlife. There were estimated losses of 10,503 habitat units (HU's) for some target wildlife species and gains of 5,129 HU's for other target species. The work group agreed that mitigation efforts should be directed toward target species that were negatively impacted by Minidoka Dam. They developed the following prioritized mitigation goals: 1,531 river otter HU's in riparian/river habitat, 1,922 sage grouse HU's in shrub-steppe (sagebrush-grassland) habitat, 1,746 mule deer HU's in shrub-steppe habitat, and 175 yellow warbler HU's in deciduous scrub-shrub wetland habitat. The work group proposed the following preferred mitigation options, in priority order: Provide benefits of 1,706 river otter and yellow warbler HU's by protecting and enhancing riparian/river habitat in south central Idaho; and provide benefits of 3,668 sage grouse and mule deer HU's by protecting and enhancing shrub-steppe (sagebrush-grassland) habitat. 38 refs., 2 figs., 5 tabs.

  16. 58th SOW Low-Dust Helicopter Landing Zone Final Environmental Assessment

    Science.gov (United States)

    2012-11-01

    Gases HLZ Helicopter Landing Zone IICEP Interagency and Intergovernmental Coordination for Environmental Planning IFR Instrument Flight Rule IR...to Instrument Flight Rule ( IFR ) flights and to VFR flights in accordance with the airspace classification (FAA 2008). Controlled airspace is

  17. Environmental history: a piece in the puzzle for establishing plans for environmental management.

    Science.gov (United States)

    Renberg, Ingemar; Bigler, Christian; Richard Bindler; Matilda Norberg; Johan Rydberg; Ulf Segerström

    2009-06-01

    Establishment of plans for environmental planning and management requires that a number of natural and societal factors must be taken into consideration. Insights into the inherent dynamics of nature as well as the role that past human activities have played for establishing the current condition of the landscape and the natural environment in general are essential. Many natural and man-made changes occur over time scales of decades or centuries, and these are difficult to comprehend without a historical perspective. Such a perspective can be obtained using palaeoecological studies, i.e. by geochemical and biological analyses of lake sediment and peat deposits. To illustrate the long-term dynamics of nature and particularly the role of man, we present here five case studies from Sweden concerning pollution, lake acidification, lake eutrophication, biodiversity, and landscape dynamics and conservation--topics of broad interests--and discuss benefits of including a longer time perspective in environmental management.

  18. Final Environmental assessment for the Uranium Lease Management Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE`s ``best interest`` is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI).

  19. Final Environmental Assessment for Aircraft Maintenance Operations Center

    Science.gov (United States)

    2014-06-01

    Historic Preservation Act AIRFA American Indian Religious Freedom Act AMC Aircraft Maintenance Contractor AMOC Aircraft Maintenance Operations...this document. Table 1-1 Applicable Environmental Laws and Regulations Federal Statutes and Policies American Indian Religious Freedom Act (AIRFA...Larks (Eremophila alpestris), Common Grackle (Quiscula quiscala), American Crow (Corvus brachyrhynchos), Turkey Vulture (Cathartes aura), Black Vulture

  20. Ground Combat Training Squadron Complex Final Environmental Assessment

    Science.gov (United States)

    2011-08-01

    Activities Areas of natural terrain with a thick understory and layers of heavy forest floor litter are important training components. Supervised...headquarters, aid and litter team, prisoner team, surveillance team, enroute recorder, compass person, and pace person. Description of the Proposed...Chapter 259 The proposed action would not affect Authorizes acquisition of Land Arquisitionfbr tourism and/or outdoor recreation. environmentally

  1. Expansion of U. S. uranium enrichment capacity. Final environmental statement

    Energy Technology Data Exchange (ETDEWEB)

    1976-04-01

    Reasonably foreseeable environmental, social, economic, and technological costs and benefits of postulated expansion of U. S. enrichment capacity through the year 2000 and reasonably available alternatives to such expansion are described. Both the gas centrifuge and gaseous diffusion methods for the enrichment of uranium are considered in this impact assessment. (JGB)

  2. Final Nellis Air Force Base Capital Improvements Program Environmental Assessment

    Science.gov (United States)

    2013-08-01

    construction activities and types of land use. Affected Environment Water Resources The Sierra Nevada, stretching along Nevada’s western border...Commission 500 Grand Central Parkway Las Vegas, NV 89109 Mr. John Mendoza , S. Planner Clark County Department of Air Quality & Environmental

  3. Possible future environmental issues for fossil fuel technologies. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Attaway, L.D.

    1979-07-01

    The work reported here was carried out for the Department of Energy's Office of Fossil Energy to identify and assess 15 to 20 major environmental issues likely to affect the implementation of fossil energy technologies between 1985 and 2000. The energy technologies specifically addressed are: oil recovery and processing; gas recovery and processing; coal liquefaction; coal gasification (surface); in situ coal gasification; direct coal combustion; advanced power systems; magnetohydrodynamics; surface oil shale retorting; and true and modified in situ oil shale retorting. Environmental analysis of these technologies included, in addition to the main processing steps, the complete fuel cycle from resource extraction to end use. The 16 environmental issues identified as those most likely for future regulatory actions and the main features of, and the possible regulatory actions associated with, each are as follows: disposal of solid waste from coal conversion and combustion technologies; water consumption by coal and oil shale conversion technologies; siting of coal conversion facilities; the carbon dioxide greenhouse effect; emission of polycyclic organic matter (POM); impacts of outer continental shelf (OCS) oil development; emission of trace elements; groundwater contamination; liquefied natural gas (LNG), safety and environmental factors; underground coal mining - health and safety; fugitive emissions from coal gasification and liquefaction - health and safety; boomtown effects; emission of fine particulates from coal, oil and oil shale technologies; emission of radioactivity from the mining and conversion of coal; emission of nitrogn oxides; and land disturbance from surface mining. (LTN)

  4. Child Development Center Construction Project Final Environmental Assessment

    Science.gov (United States)

    2005-04-01

    3-9 3.5.1 Noise Sensitive Receptors...Project Page iii Environmental Assessment LIST OF ACRONYMS 96 ABW 96th Airbase Wing 96 ABW/SEU Range Safety 96 AMDS/ SGB Base Bioenvironmental...site is classified as landscaped/urban. Some longleaf pines would be removed as a result of the construction, but no sensitive species would be

  5. 77 FR 18879 - Department of Transportation Final Environmental Justice Strategy

    Science.gov (United States)

    2012-03-28

    ... Strategy AGENCY: Office of the Secretary of Transportation, DOT. ACTION: Notice. SUMMARY: The Department of Transportation is issuing a revised environmental justice strategy, which sets forth DOT's commitment to... agency policies and activities on minority and low-income populations. This strategy is published as...

  6. Final Monitoring Plan for Site Closure at Inman, Kansas

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-02-01

    Inman, Kansas, is a rural town located in southwest McPherson County, in sections 8, 9, 16, and 17, Township 21 South, Range 4 West (Figure 1.1). There are 1,377 people in 513 households, as of the census of 2010. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA), operated a grain storage facility at the southern edge of the city of Inman, Kansas, from 1954 to 1965. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In 1997, trace to low levels of carbon tetrachloride (below the maximum contamination level [MCL] of 5.0 μg/L) were detected in three private wells near the former grain storage facility at Inman, as part of a statewide USDA private well sampling program that was implemented by the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. No public water supply wells were identified within 1 mi of the town by the KDHE in 1998. Carbon tetrachloride is the contaminant of primary concern at sites associated with grain storage operations. To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the carbon tetrachloride contamination in groundwater, the CCC/USDA agreed to conduct a multi-phase investigation at Inman. The investigation was performed by the Environmental Science Division of Argonne National Laboratory in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA.

  7. EPA Finalizes Plan to Address Contaminated Groundwater at Curtis Specialty Papers Superfund Site in Milford Borough and Alexandria Township, N.J.

    Science.gov (United States)

    (New York, N.Y.) The U.S. Environmental Protection Agency has finalized a plan to clean up contaminated groundwater at the Curtis Specialty Papers Superfund site in Milford Borough and Alexandria Township, New Jersey. The site includes the former Milford P

  8. Environmental planning in mine waste management: The Huckleberry Mines experience

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, D. C. [Suncor Energy Inc., Fort McMurray, AB (Canada); Letient, H. F. [Compania Minera Antamina (Peru)

    2004-02-01

    A mine waste management plan, designed to prevent the onset of acid rock drainage and facilitate reclamation of the mine site is discussed. The waste management plan takes into account the requirement for permanently flooding the potentially acid-generating rock and tailings. To avoid long-term acid rock drainage, the plan calls for floating the pyrite out of the tailings towards the end of the life of the mine, thus generating a a non-acid generating tailings stream which will be used to cap the deposited mine waste. When the mine is closed, a permanent water cover will be maintained over the mine waste, leaving only the potentially non-acid generating tailings exposed. Retaining structures will be constructed so as to maximize the use of overburden and minimize the need for additional till and rockfill to be imported from outside the mine site. Dam slopes will be reclaimed with topsoil and overburden stripped during mine development and stockpiled until needed for reclamation. By disposing of the acid-generating mine waste and tailings by permanent flooding, acid generation from these wastes will be prevented, overall environmental liabilities will be minimized, and long-term water quality of the surrounding streams will be safeguarded. 9 figs.

  9. Military plans massive Arctic exercise to prepare for environmental disaster

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2004-12-01

    Planning by the Canadian military for a major exercise to prepare for a possible environmental disaster in the Mackenzie Delta is reported. There has been intense energy exploration over the least few years in the region and more is expected as the proposed pipeline to transport natural gas to southern markets is constructed. Additional drilling in the Beaufort Sea is also being rumored, which would represent further threat to the environment. The object of the exercise is for the military to be ready to respond to any industrial or shipping accident since the territorial government does not have the resources to do so. The Canadian Coast Guard and the RCMP also participated in the exercise last year; current plans call for bringing in Parks Canada, Environment Canada, the Department of Fisheries and Oceans, and some of the Alaska-based Americans to participate in the exercises this year. This year's exercises will address some of the recommendations contained in the 2000 Arctic Capability Report which was particularly critical of the lack of contingency planning, the reduced Arctic training received by the military, and the quality of equipment available to the military to respond to emergencies.

  10. Integration of landslide susceptibility products in the environmental plans

    Science.gov (United States)

    Fiorucci, Federica; Reichenbach, Paola; Rossi, Mauro; Cardinali, Mauro; Guzzetti, Fausto

    2015-04-01

    Landslides are one of the most destructive natural hazard that causes damages to urban area worldwide. The knowledge of where a landslide could occur is essential for the strategic management of the territory and for a good urban planning . In this contest landslide susceptibility zoning (LSZ) is crucial to provide information on the degree to which an area can be affected by future slope movements. Despite landslide susceptibility maps have been prepared extensively during the last decades, there are few examples of application is in the environmental plans (EP). In this work we present a proposal for the integration of the landslide inventory map with the following landslide susceptibility products: (i) landslide susceptibility zonation , (ii) the associated error map and (iii) the susceptibility uncertainty map. Moreover we proposed to incorporate detailed morphological studies for the evaluation of landslide risk associated to local parceling plan. The integration of all this information is crucial for the management of landslide risk in urban expansions forecasts. Municipality, province and regional administration are often not able to support the costs of landslide risk evaluation for extensive areas but should concentrate their financial resources to specific hazardous and unsafe situations defined by the result of the integration of landslide susceptibility products. Zonation and detail morphological analysis should be performed taking into account the existing laws and regulations, and could become a starting point to discuss new regulations for the landslide risk management.

  11. Planning Environmental Impact Assessment Orienting Sustainable Development:Opportunities and Challenges

    Institute of Scientific and Technical Information of China (English)

    Sun Yanjun; Chen Xingeng; Bao Yun; Peng Xiaochun; Gao Changbo

    2005-01-01

    Strategic Environmental Assessment is a frontier subject in the field of Environmental Impact Assessment. In the past two decades, especially in recent years, much more importance has been attached to Strategic Environmental Assessment. The Environmental Impact Assessment Law of the P.R.China which was promulgated provides a great opportunity for the development of Planning Environmental Impact Assessment and brings great challenges for the development of traditional Project Environmental Impact Assessment and Planning Environmental Impact Assessment at the same time.In order to promote the implementation of"The EIA Law", the inherent limitations of Project Environmental Impact Assessment must be identified sufficiendy and the theory research and practice of Planning Environmental Impact Assessment should be strengthened as well. Measures should be taken currendy to enforce the operation system. The authors wish to offer a few references to the progress and implementation of Planning Environmental Impact Assessment in China.

  12. Final draft: Comprehensive hatchery management plan: Spring Creek National Fish Hatchery: Planning report: Number 4

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The U.S. Fish and Wildlife Service (Service) has recognized the need for a comprehensivehatchery planning process to assist in meeting the challenge of changes to...

  13. Final environmental impact statement. Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    In accordance with the National Environmental Policy Act (NEPA) of 1969, the US Department of Energy (DOE) has prepared this document as environmental input to future decisions regarding the Waste Isolation Pilot Plant (WIPP), which would include the disposal of transuranic waste, as currently authorized. The alternatives covered in this document are the following: (1) Continue storing transuranic (TRU) waste at the Idaho National Engineering Laboratory (INEL) as it is now or with improved confinement. (2) Proceed with WIPP at the Los Medanos site in southeastern New Mexico, as currently authorized. (3) Dispose of TRU waste in the first available repository for high-level waste. The Los Medanos site would be investigated for its potential suitability as a candidate site. This is administration policy and is the alternative preferred by the DOE. (4) Delay the WIPP to allow other candidate sites to be evaluated for TRU-waste disposal. This environmental impact statement is arranged in the following manner: Chapter 1 is an overall summary of the analysis contained in the document. Chapters 2 and 4 set forth the objectives of the national waste-management program and analyze the full spectrum of reasonable alternatives for meeting these objectives, including the WIPP. Chapter 5 presents the interim waste-acceptance criteria and waste-form alternatives for the WIPP. Chapters 6 through 13 provide a detailed description and environmental analysis of the WIPP repository and its site. Chapter 14 describes the permits and approvals necessary for the WIPP and the interactions that have taken place with Federal, State, and local authorities, and with the general public in connection with the repository. Chapter 15 analyzes the many comments received on the DEIS and tells what has been done in this FEIS in response. The appendices contain data and discussions in support of the material in the text.

  14. Nevada Test Site, Nye County, Nevada. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-09-01

    This environmental statement for the Nevada Test Site (NTS) considers underground nuclear detonations with yields of one megaton or less, along with the preparations necessary for such detonations. The testing activities considered also include other continuing and intermittent activities, both nuclear and nonnuclear, which can best be conducted in the remote and controlled area of the Nevada Test Site. These activities are listed, with emphasis on weapons testing programs which do not remain static.

  15. Final report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of {open_quotes}cut/thrust and compact cuttings without adding large quantities of fluid{close_quotes} to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal.

  16. 78 FR 16286 - Neal Smith National Wildlife Refuge, Jasper County, IA; Final Comprehensive Conservation Plan and...

    Science.gov (United States)

    2013-03-14

    ... Fish and Wildlife Service Neal Smith National Wildlife Refuge, Jasper County, IA; Final Comprehensive... significant impact (FONSI) for the Environmental Assessment (EA) for Neal Smith National Wildlife Refuge... . Include ``Neal Smith Final CCP'' in the subject line of the message. U.S. Mail: Neal Smith...

  17. A window on urban sustainability. Integration of environmental interests in urban planning through 'decision windows'

    NARCIS (Netherlands)

    Stigt, R. van; Driessen, P.P.J.; Spit, T.J.M.

    2013-01-01

    Sustainable urban development requires the integration of environmental interests in urban planning. Although variousmethods of environmental assessment have been developed, plan outcomes are often disappointing due to the complex nature of decision-making in urban planning, which takes place in

  18. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Science.gov (United States)

    2011-04-25

    ... National Park Service Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National... comment period for Draft Environmental Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan...

  19. 76 FR 3652 - Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation Area, California

    Science.gov (United States)

    2011-01-20

    ... National Park Service Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation...) is releasing a Draft Environmental Impact Statement for the Dog Management Plan (Draft Plan/EIS), Golden Gate National Recreation Area (GGNRA), California. Current dog management in GGNRA is based on a...

  20. 76 FR 68503 - Ungulate Management Plan/Environmental Impact Statement, Great Sand Dunes National Park and...

    Science.gov (United States)

    2011-11-04

    ... National Park Service Ungulate Management Plan/Environmental Impact Statement, Great Sand Dunes National... Intent to prepare an Environmental Impact Statement for the Ungulate Management Plan, Great Sand Dunes... Ungulate Management Plan, Great Sand Dunes National Park and Preserve, Colorado. The purpose of this...

  1. Environmental Education in Graduate Professional Degrees: The Case of Urban Planning

    Science.gov (United States)

    White, Stacey Swearingen; Mayo, James M.

    2005-01-01

    Environmental education (EE) is a prominent aspect of graduate-level master's programs in urban and regional planning. This article draws on the results of a survey of 66 environmental planning educators in urban and regional planning programs to show what types of EE are most prevalent in these graduate professional programs and in planning…

  2. Environmental Education in Graduate Professional Degrees: The Case of Urban Planning

    Science.gov (United States)

    White, Stacey Swearingen; Mayo, James M.

    2005-01-01

    Environmental education (EE) is a prominent aspect of graduate-level master's programs in urban and regional planning. This article draws on the results of a survey of 66 environmental planning educators in urban and regional planning programs to show what types of EE are most prevalent in these graduate professional programs and in planning…

  3. 75 FR 4842 - Winter Use Plan, Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2010-01-29

    ... National Park Service Winter Use Plan, Environmental Impact Statement, Yellowstone National Park AGENCY... Impact Statement for a Winter Use Plan, Yellowstone National Park. SUMMARY: Pursuant to the National... Environmental Impact Statement (EIS) for a Winter Use Plan for Yellowstone ] National Park, located in...

  4. 77 FR 38824 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2012-06-29

    ... National Park Service Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone... Supplemental Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park. SUMMARY...) for a Winter Use Plan for Yellowstone National Park, located in Idaho, Montana and Wyoming. DATES:...

  5. Strategic environmental assessment (SEA) for wind energy planning: Lessons from the United Kingdom and Germany

    Energy Technology Data Exchange (ETDEWEB)

    Phylip-Jones, J., E-mail: jonesjp@liverpool.ac.uk; Fischer, T.B., E-mail: fischer@liv.ac.uk

    2015-01-15

    This paper reports on SEA applied in the wind energy sector in the UK and Germany. Based on a review of 18 SEAs, it is found that the quality of SEA documentation is variable, with over a third of them being deemed unsatisfactory. Furthermore, SEA processes are conducted to varying degrees of effectiveness, with scoping a strength but impact prediction and mitigation weaknesses. Generally speaking, the influence of SEA on German wind energy plan making was found to be low and the influence of SEA on UK plans deemed to be moderate. The German plans had a low influence mainly because of a perceived high environmental performance of the underlying plans in the first instance. Substantive outcomes of SEA are not always clear and the influence of SEA on decision making is said to be limited in many cases. Finally, a lack of effective tiering between SEA and project level EIA is also observed. In addition, our findings echo some of the weaknesses of SEA practice found in previous studies of SEA effectiveness, including poor impact prediction and significance sections and a lack of detailed monitoring programmes for post plan implementation.

  6. Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1998-12-31

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

  7. A Framework for Urban Environmental Planning in Brazil

    Directory of Open Access Journals (Sweden)

    Mônica Amaral Haddad

    2015-10-01

    Full Text Available Brazil faces numerous environmental challenges despite having many laws and policies in place. The implementation process of such laws and policies does not exist a majority of the time, affecting the quality of environmental governance in the country. Within the urban planning context, the City Statute law enacted in 2001 included the environmental dimension of urbanization; however, the wording of this inclusion was vague and broad. For instance, two environmental assessment planning tools of the law are not mandatory at the federal level and are without a defined scope. In this Exploration, a new framework focusing on the environmental dimension of urbanization is proposed. These two planning tools can be developed using the framework, which is based on the concept of carrying capacity and geographical information systems; it includes a combination of participatory mapping (i.e., increasing knowledge and tactical urbanism (i.e., increasing awareness to enhance public participation, targeting low-income populations. This combination was chosen because by increasing the knowledge and awareness of the poor who will participate in environmental-related projects, it will empower and allow them to exert their influence as citizens more fully. Resumen: Un marco para la planificación ambiental urbana en Brasil Resumen: Brasil afronta numerosos retos ambientales a pesar de contar con muchas leyes y políticas. El proceso de aplicación de dichas leyes y políticas no se lleva a cabo la mayoría de las veces, lo cual afecta a la calidad de la gobernanza ambiental en este país. Dentro del contexto de planificación urbana, la ley denominada Estatuto de la Ciudad y promulgada en 2001 incluyó la dimensión ambiental de la urbanización; sin embargo, la formulación de dicha inclusión era vaga y amplia. Por ejemplo, dos herramientas de la ley para la planificación ambiental no son obligatorias a nivel federal y no disponen de un campo de aplicaci

  8. Stability of volatile organics in environmental soil samples. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Maskarinec, M.P.; Bayne, C.K.; Jenkins, R.A.; Johnson, L.H.; Holladay, S.K.

    1992-11-01

    This report focuses on data generated for the purpose of establishing the stability of 19 volatile organic compounds in environmental soil samples. The study was carried out over a 56 day (for two soils) and a 111 day (for one reference soil) time frame and took into account as many variables as possible within the constraints of budget and time. The objectives of the study were: 1) to provide a data base which could be used to provide guidance on pre-analytical holding times for regulatory purposes; and 2) to provide a basis for the evaluation of data which is generated outside of the currently allowable holding times.

  9. Environmental impacts of thermochemical biomass conversion. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, D.C.; Hart, T.R.; Neuenschwander, G.G.; McKinney, M.D.; Norton, M.V.; Abrams, C.W. [Pacific Northwest Lab., Richland, WA (United States)

    1995-06-01

    Thermochemical conversion in this study is limited to fast pyrolysis, upgrading of fast pyrolysis oils, and gasification. Environmental impacts of all types were considered within the project, but primary emphasis was on discharges to the land, air, and water during and after the conversion processes. The project discussed here is divided into five task areas: (1) pyrolysis oil analysis; (2) hydrotreating of pyrolysis oil; (3) gas treatment systems for effluent minimization; (4) strategic analysis of regulatory requirements; and (5) support of the IEA Environmental Systems Activity. The pyrolysis oil task was aimed at understanding the oil contaminants and potential means for their removal. The hydrotreating task was undertaken to better define one potential means for both improving the quality of the oil but also removing contaminants from the oil. Within Task 3, analyses were done to evaluate the results of gasification product treatment systems. Task 4 was a review and collection of regulatory requirements which would be applicable to the subject processes. The IEA support task included input to and participation in the IEA Bioenergy activity which directly relates to the project subject. Each of these tasks is described along with the results. Conclusions and recommendations from the overall project are given.

  10. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  11. Computer-aided process planning: Development of an expert process planning system. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Brooks, S.L.; Hummel, K.E.; Wolf, M.L.

    1991-12-01

    The project utilizes artificial intelligence (AI) technology to develop an expert system that will be used to prepare production plans, to automatically make cutting tool selections, and to automatically define machinability parameters and NC tape requirements. The expert system, XCUT, can plan features on moderately complex prismatic machined parts and reduce 2 to 4 hours of manual process effort into 15 or 30 minutes. Areas of future work have been identified that will enable the XCUT system to be used for production. These areas where further development is required are geometric reasoning, representation of manufacturing features, dimensioning and tolerancing, feature extraction, distributed computing architecture, knowledge gathering, and user interfaces.

  12. Water environmental planning considering the influence of non-linear characteristics

    Institute of Scientific and Technical Information of China (English)

    ZENG Guang-ming; QIN Xiao-sheng; WANG Wei; HUANG Guo-he; LI Jian-bing; B. Statzner

    2003-01-01

    In practical water environmental planning, the influence of the non-linear characteristics on the benefit of environmental investment was seldom taken into consideration. This paper demonstrates that there exist a lot of non-linear behaviors in water environment by emphatically analyzing the influence of the non-linear characteristics of the economic scale, the meandering river and the model on water environmental planning, which will make a certain impact on the water environmental planning that sometimes cannot be neglected. This paper also preliminarily explores how to integrate the non-linear characteristics into water environmental planning. The results showed that compared with traditional methods, water environmental planning considering non-linear characteristics has its prevalence and it is necessary to develop the relevant planning theories and methods.

  13. 77 FR 74508 - Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental...

    Science.gov (United States)

    2012-12-14

    ... Bureau of Land Management Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental Impact Statement for the Ring of Fire Resource Management Plan--Haines Planning Area, Alaska... Management Area (ERMA) designation. The Ring of Fire RMP ROD also deferred to a subsequent planning effort...

  14. 76 FR 17471 - Air Tour Management Plan Environmental Assessment for Mount Rainier National Park, WA; Public...

    Science.gov (United States)

    2011-03-29

    ... Director's Order 12: Conservation Planning, Environmental Impact Analysis, and Decision-making, and NPS... Planning, Environment and Public Comment System at: http://parkplanning.nps.gov/MORA_ATMP or sent to the...://www.faa.gov/about/office_org/headquarters_offices/arc/programs/air_tour_management_plan/ NPS Planning...

  15. Graduate Curriculum Development for Social Planning Specialization in Urban and Regional Planning. Final Report.

    Science.gov (United States)

    McClure, Edward E.; Graetz, Robert E.

    A model curriculum in social planning at the graduate level has been developed and tested as an area of study at Florida State University (FSU). The project, which lasted from early 1967 through the summer of 1968, involved (1) a workshop to review the educational needs that should be met by the proposed curriculum, (2) a second workshop that…

  16. Environmental friendly high efficient light source plasma lamp - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Courret, G.; Calame, L. [Haute Ecole d' ingenierie et de gestion du canton de Vaud, Institut de micro et nano techniques, Yverdon-les-Bains (Switzerland); Meyer, A. [Solaronix SA, Aubonne (Switzerland)

    2007-07-01

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) takes a look at work done on the development of a sulphur-based plasma lamp. In 2007, the capability of a new modulator has been explored. The most important results are discussed. With the production of a 1.2 cm{sup 3} bulb, the way towards the production of a 100 W lamp has been opened. The authors comment that modulation by impulses increases the luminous efficiency in comparison to modulation using a continuous sinusoidal wave. The report deals with the history of the project, the development of the new modulator, the use of rotational effects and the optimisation of the amount of active substances - tellurium and selenium - in the bulb. The electromagnetic coupling system used is described and discussed.

  17. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    Energy Technology Data Exchange (ETDEWEB)

    Deffenbaugh, M.L.

    1998-05-28

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464.

  18. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    Energy Technology Data Exchange (ETDEWEB)

    Deffenbaugh, M.L.

    1998-05-28

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464.

  19. Revised Comprehensive Conservation Plan and Environmental Impact Statement: Volumes 1 and 2- Kenai National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Revised Comprehensive Conservation Plan (Plan) and Environmental Impact Statement (EIS) for the Kenai National Wildlife Refuge will guide management of the...

  20. Green city Banda Aceh: city planning approach and environmental aspects

    Science.gov (United States)

    Arif, A. A.

    2017-02-01

    Banda Aceh as the capital of Aceh Province is the region with the tsunami disaster that occurred on December 26, 2004 the most severe of which over 60% of the city area were destroyed mainly coastal region and settlements. One product plan for rehabilitation and reconstruction of Banda Aceh is made of Banda Aceh as Green City. To realize the Green City Banda Aceh, urban development process should be conducted in a planned and integrated way with attention to spatial and environmental aspects to ensure an efficient urban management and to create a healthy, beautiful and comfortable environment. There is a weakness of the process in urban planning and development that occurred at present where cities tend to minimize the development of green open space and land conversion into a commercial district, residential areas, industrial areas, transport networks and infrastructure and facilities for other cities. Another tendency that occurs is urban environment only developed economically but not ecologically, whereas ecological balance is as important as the development of the economic value of urban areas. Such conditions have caused unbalance of urban ecosystems including increased air temperature, air pollution, declining water table, flooding, salt water intrusion and increased content of heavy metals in the soil. From an ecological perspective, unfavorable microclimate, high-temperature increase due to the lack of trees as a sieve / filter against heavy rain, can cause flooding. These conditions result in inconvienient, arid and less beautiful urban areas. The author identifies the elements contained in the Green City Banda Aceh and how the efforts and approaches must be made toward Green City Banda Aceh.

  1. Department of the Interior : Final Environmental Statement : FES 75-76 : Proposed Desert Wilderness Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is a final analysis of the environmental impact wilderness designation would pose for the Desert Wilderness Area. Topics covered include where the...

  2. 75 FR 77897 - Long Walk National Historic Trail Feasibility Study, Abbreviated Final Environmental Impact...

    Science.gov (United States)

    2010-12-14

    ... trail would be designated, emphasizing the removal experiences common to both tribes. An auto tour route... National Park Service Long Walk National Historic Trail Feasibility Study, Abbreviated Final Environmental Impact Statement, National Trails Intermountain Region, NM AGENCY: National Park Service,...

  3. Final Environmental Assessment for the Proposed Wallkill River National Wildlife Refuge 1990

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Final Environmental Assessment for the proposed acquisition and establishment of Wallkill River National Wildlife Refuge in Sussex Country, New Jersey. The...

  4. 78 FR 52909 - Consumer Financial Protection Bureau Notice of Availability of Final Environmental Assessment...

    Science.gov (United States)

    2013-08-27

    ... From the Federal Register Online via the Government Publishing Office CONSUMER FINANCIAL PROTECTION BUREAU Consumer Financial Protection Bureau Notice of Availability of Final Environmental... Organization Headquarters Building, Washington, DC AGENCY: Bureau of Consumer Financial Protection....

  5. Final Environmental Assessment : Livestock Grazing Management Seven Blackfeet Habitat Unit : Charles M. Russell National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Final environmental assessment for the grazing management within the Seven Blackfeet Habitat Unit of the Charles M. Russell National Wildlife Refuge, in relation to...

  6. Department of the Interior : Final Environmental Statement : FES 73-46 : Proposed Anaho Island Wilderness Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is a final analysis of the environmental impact wilderness designation would pose for the Anaho Island Wilderness Area. Topics covered include where...

  7. Cherry Valley National Wildlife Refuge Final Feasibility Study and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In accordance with the National Environmental Policy Act (NEPA), as amended, the Service has developed a Final EA in response to the Cherry Valley National Wildlife...

  8. Department of the Interior : Final Environmental Statement : FES 75-4 : Proposed Cape Romain Wilderness Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is a final analysis of the environmental impact wilderness designation would pose for the Cape Romain Wilderness Area. Topics covered include where the...

  9. The role of immediate and final goals in action planning: an fMRI study.

    Science.gov (United States)

    Majdandzić, Jasminka; Grol, Meike J; van Schie, Hein T; Verhagen, Lennart; Toni, Ivan; Bekkering, Harold

    2007-08-15

    To interact effectively with our environment, we need to specify the intended outcomes (goals) of our actions. In this process, immediate goals and final goals can be regarded as different levels within a hierarchically organized system for action planning: immediate goals and movement details are selected to accomplish more remote goals. Behavioral studies support this notion of different levels of action planning, but the neurophysiological basis remains unclear. Using fMRI, we examined the neural correlates of preparing object manipulations based on either the desired end-state (the final goal) or the initial movement towards a target (the immediate goal). Subjects had to insert an object (consisting of a large and a small cube) into one of two corresponding large and small slots. The subjects were cued on either which slot to fill (Final Goal trials) or which object part to grasp (Immediate Goal trials). These actions required similar movements, but different planning. During Final Goal trials, there was differential preparatory activity along the superior frontal gyrus (bilaterally) and in left inferior parietal cortex. Immediate Goal trials evoked differential activity in occipito-parietal and occipito-temporal cortex. These findings support the notion that actions can be planned at different levels. We show that different fronto-parietal circuits plan the same action, by a relative emphasis on either selecting a sequence of movements to achieve a desired end-state, or selecting movements spatially compatible with given object properties.

  10. Savannah River Site Environmental Monitoring Plan. Volume 1, Section 1000 Addendum: Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Jannik, G.T.

    1994-10-01

    This document -- the Savannah River Site Environmental Monitoring Plan (SRS EM Plan) -- has been prepared according to guidance contained in the DOE 5400 Series orders, in 10 CFR 834, and in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and environmental Surveillance [DOE, 1991]. The SRS EM Plan`s purpose is to define the criteria, regulations, and guideline requirements with which SRS will comply. These criteria and requirements are applicable to environmental monitoring activities performed in support of the SRS Environmental Monitoring Program (SRS EM Program), WSRC-3Q1-2, Volume 1, Section 1100. They are not applicable to monitoring activities utilized exclusively for process monitoring/control. The environmental monitoring program requirements documented in the SRS EM Plan incorporate all applicable should requirements of DOE/EH-0173T and expand upon them to include nonradiological environmental monitoring program requirements.

  11. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  12. SNL/CA Environmental Planning and Ecology Program Annual Report 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2007-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  13. Statistical Classification of Terrestrial and Marine Ecosystems for Environmental Planning

    Directory of Open Access Journals (Sweden)

    W. Schröder

    2007-10-01

    Full Text Available E nvironmental planning is an instrument for the operationalisation of the precautionary principle in environmental law and, to this end, must rely on maps depicting the spatial patterns of ecological attributes of aquatic and terrestrial ecosystems and of environmental change effects, respectively. In this context, different mapping techniques are presented by example of three case studies covering terrestrial, coastal and marine environments. The first case study was selected to demonstrate how to compute an ecological land classification of Germany by means of CART. The resulting ecoregions were mapped by GIS. This CARTography enables to regionalise metal bioaccumulation data in terms of 21 ecological land categories and to prove the specifity of emission control measures as being part of environmental policies. The second investigation was chosen to applyfor the first time in Germany the regionalisation approach to the research of climate change effects in terms of past, recent and potential future incidences of Anopheles sp. and malaria in Lower Saxony. To investigate whether malaria might be transmitted due to increasing air temperatures, data sets on past and future air temperatures were used to spatially model malaria risk areas. The third example demonstrates the transfer of the CARTography approach presented in the first case study from terrestrial to marine environments. We analysed the statistical relations between data on benthic communities and physical properties of their marine environments by means of CART and applied these rules to geodata which only describe physical characteristics of the benthic habitats. By this, those parts of the sea ground could be predicted where certain benthic communities might occur.

  14. Planned Environmental Microbiology Aspects of Future Lunar and Mars Missions

    Science.gov (United States)

    Ott, C. Mark; Castro, Victoria A.; Pierson, Duane L.

    2006-01-01

    With the establishment of the Constellation Program, NASA has initiated efforts designed similar to the Apollo Program to return to the moon and subsequently travel to Mars. Early lunar sorties will take 4 crewmembers to the moon for 4 to 7 days. Later missions will increase in duration up to 6 months as a lunar habitat is constructed. These missions and vehicle designs are the forerunners of further missions destined for human exploration of Mars. Throughout the planning and design process, lessons learned from the International Space Station (ISS) and past programs will be implemented toward future exploration goals. The standards and requirements for these missions will vary depending on life support systems, mission duration, crew activities, and payloads. From a microbiological perspective, preventative measures will remain the primary techniques to mitigate microbial risk. Thus, most of the effort will focus on stringent preflight monitoring requirements and engineering controls designed into the vehicle, such as HEPA air filters. Due to volume constraints in the CEV, in-flight monitoring will be limited for short-duration missions to the measurement of biocide concentration for water potability. Once long-duration habitation begins on the lunar surface, a more extensive environmental monitoring plan will be initiated. However, limited in-flight volume constraints and the inability to return samples to Earth will increase the need for crew capabilities in determining the nature of contamination problems and method of remediation. In addition, limited shelf life of current monitoring hardware consumables and limited capabilities to dispose of biohazardous trash will drive flight hardware toward non-culture based methodologies, such as hardware that rapidly distinguishes biotic versus abiotic surface contamination. As missions progress to Mars, environmental systems will depend heavily on regeneration of air and water and biological waste remediation and

  15. Environmental Action Memorandum : [Patoka River National Wildlife Refuge Hunting and Fishing Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Environmental Action Memorandum states that the Patoka River NWR Hunting and Fishing Plan is found not to have significant environmental effects.

  16. 77 FR 44267 - Notice of Availability of the Final Programmatic Environmental Impact Statement for Solar Energy...

    Science.gov (United States)

    2012-07-27

    ... Environmental Impact Statement for Solar Energy Development in Six Southwestern States AGENCY: Bureau of Land... availability of the Final Programmatic Environmental Impact Statement for Solar Energy Development in Six... Programmatic EIS and Proposed RMP Amendments, references, and additional information regarding solar...

  17. 76 FR 63923 - Notice of Availability To Distribute a Final Environmental Impact Statement (FEIS) for the...

    Science.gov (United States)

    2011-10-14

    ... ADMINISTRATION Notice of Availability To Distribute a Final Environmental Impact Statement (FEIS) for the Construction of a New Land Port of Entry in International Falls, MN AGENCY: Public Buildings Service, General... distribute a FEIS under the National Environmental Policy Act (NEPA) of 1969 to assess the potential...

  18. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Science.gov (United States)

    2011-10-31

    ... Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells Hydrolectric Project In accordance with the National Environmental... reviewed the application for license for the Wells Hydroelectric Project (FERC No. 2149), located on...

  19. 76 FR 80924 - Boott Hydropower, Inc.; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2011-12-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Boott Hydropower, Inc.; Notice of Availability of Final Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and ] the Federal Energy...

  20. Integration of strategic environmental assessment in spatial planning

    DEFF Research Database (Denmark)

    Kørnøv, Lone

    The paper explores the similarities between the content of the EU directive, SEA practice and the existing spatial planning in Denmark, and how SEA can be integrated into plan making and plan implementation.......The paper explores the similarities between the content of the EU directive, SEA practice and the existing spatial planning in Denmark, and how SEA can be integrated into plan making and plan implementation....

  1. Integration of strategic environmental assessment in spatial planning

    DEFF Research Database (Denmark)

    Kørnøv, Lone

    The paper explores the similarities between the content of the EU directive, SEA practice and the existing spatial planning in Denmark, and how SEA can be integrated into plan making and plan implementation.......The paper explores the similarities between the content of the EU directive, SEA practice and the existing spatial planning in Denmark, and how SEA can be integrated into plan making and plan implementation....

  2. Policy recommendations for improvement and strengthening of future provincial environmental five years plans in China

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-11-15

    Since the Eleventh Five-Year Plan (2006-2010) started, the environmental protection plan has been playing a more and more important role in the implementation of Chinas national environmental protection strategy as well as promoting and carrying out the 'three historical transitions' in environmental protection, and enhancing the functions of environmental protection for macroscopic adjustment and control and optimizing economic growth.(auth)

  3. 77 FR 74865 - Notice of Availability of the Final Environmental Impact Statement for the Searchlight Wind...

    Science.gov (United States)

    2012-12-18

    ...) has prepared a Final Environmental Impact Statement (EIS) for the Searchlight Wind Energy Project and..., phone 702-515-5173, or email to: BLM_NV_SNDO_SearchlightWindEnergyEIS@blm.gov . Interested persons may.../searchlight_wind_energy.html . Copies of the Final EIS are available for public inspection at the BLM...

  4. Strategic environmental impact assessment in spatial planning an instrument for assessment of importance of plan solutions for environmental protection and sustainable development

    Directory of Open Access Journals (Sweden)

    Filipović Dejan

    2005-01-01

    Full Text Available Protection, improvement and rational utilization of the environment becomes more and more primary task in modern society's struggle for more ecological healthy and humane living and working conditions. In order to living conditions satisfy man's social, economic, health and other needs protection, improvement and utilization of the environment must be in accordance with principles of sustainable development. Fact that planned solutions have great influence on quality of some environmental elements imposes importance of spatial planning for providing healthy environment as one of basic human needs. As in many planning documents environmental aspect was not considering in the way that it was needed to be, there arose a need for Strategic Environmental Impact Assessment in aim to verify are the planning documents in coherence with environmental protection and sustainable development.

  5. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix R: Pacific Northwest Coordination agreement (PNCA).

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    Currently, the Federal government coordinates the planning and operation of the Federal Columbia River Power System (FCRPS) with projects owned and operated by the region`s non-Federal hydrogenerating utilities pursuant to the Pacific North-west Coordination Agreement (PNCA). The Bureau of Reclamation (Reclamation), the Corps of Engineers (Corps), and the Bonneville Power Administration (BPA) are parties to the PNCA on behalf of the government of the United States. The PNCA is a complex agreement that provides an opportunity for the region`s power producers to maximize the power system`s reliability and economy while meeting their multiple-use objectives. The PNCA does not dictate the operation of the resources it coordinates. It is essentially an accounting mechanism that exchanges the power produced among the parties in order to improve the reliability of the system and reduce regional power costs. Project owners retain complete autonomy to operate as needed to meet their multiple-use requirements. The PNCA was executed in 1964 as an important component of regional plans to maximize the Northwest`s hydro resource capability. Maximization also included the development of storage projects on the Columbia River in Canada pursuant to the terms of the 1964 Columbia River Treaty. Because of the link between power coordination and Treaty issues, the current parties to the PNCA, currently are contemplating entering into a replacement or renewed power coordination agreement. Because the power coordination agreement is a consensual arrangement, its ultimate provisions must be acceptable to all of its signatories. This Appendix R to the Final Environmental Impact Statement of the Columbia River System is a presentation of the Pacific North-west Coordination Agreement.

  6. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  7. Master plan study - District heating Sillamaee municipality. Estonia. Final report. Appendices for chapter 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The appendices to the final report on the master plan study on the cogenerating district heating system in the municipality of Sillamae (Estonia) gives technical and costs data on existing conditions and on possible new facilities. The data relates to energy output, the energy budget, heat load duration curves, and to suggestions for improvement. (ARW)

  8. The role of immediate and final goals in action planning: An fMRI study

    NARCIS (Netherlands)

    Majdandzic, J.; Grol, M.J.; Schie, H.T. van; Verhagen, L.; Toni, I.; Bekkering, H.

    2007-01-01

    To interact effectively with our environment, we need to specify the intended outcomes (goals) of our actions. In this process, immediate goals and final goals can be regarded as different levels within a hierarchically organized system for action planning: immediate goals and movement details are

  9. Environmental Contaminants Monitoring Plan for Stillwater National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This environmental contaminants monitoring program is designed to assess concentrations, distribution, and biological availability of environmental contaminants on...

  10. 75 FR 53980 - Notice of Availability of the Record of Decision; Elk Management Plan/Environmental Impact...

    Science.gov (United States)

    2010-09-02

    ... National Park Service Notice of Availability of the Record of Decision; Elk Management Plan/Environmental... Decision on the Elk Management Plan/Environmental Impact Statement for Theodore Roosevelt National Park... the Record of Decision (ROD) for the Elk Management Plan/Environmental Impact Statement (Plan/EIS) for...

  11. 36 CFR 223.40 - Cancellation for environmental protection or inconsistency with plans.

    Science.gov (United States)

    2010-07-01

    ... Renewable Resources Planning Act of 1974, as amended. Such provision shall provide for reasonable... environmental protection or inconsistency with plans. 223.40 Section 223.40 Parks, Forests, and Public Property... Contracts Contract Conditions and Provisions § 223.40 Cancellation for environmental protection or...

  12. 36 CFR 223.218 - Consistency with plans, environmental standards, and other management requirements.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Consistency with plans, environmental standards, and other management requirements. 223.218 Section 223.218 Parks, Forests, and Public... Special Forest Products § 223.218 Consistency with plans, environmental standards, and other...

  13. 76 FR 51395 - Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP), Canaveral...

    Science.gov (United States)

    2011-08-18

    ... National Park Service Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP... Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP), Canaveral National...-Action Alternative that continues current management policies and the NPS's preferred alternative. The...

  14. 77 FR 12323 - Draft Environmental Impact Statement for the General Management Plan, Buck Island Reef National...

    Science.gov (United States)

    2012-02-29

    ... National Park Service Draft Environmental Impact Statement for the General Management Plan, Buck Island... Availability of a Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP), Buck Island... alternatives for consideration, including a No-Action Alternative that continues current management policies...

  15. 78 FR 68469 - Draft General Management Plan/Wilderness Study/Environmental Impact Statement, Channel Islands...

    Science.gov (United States)

    2013-11-14

    ... National Park Service Draft General Management Plan/Wilderness Study/Environmental Impact Statement... availability of a Draft General Management Plan (GMP)/Wilderness Study/Environmental Impact Statement (EIS) for... action alternative) reflects current management direction and serves as a baseline for comparison with...

  16. The Capacity to Integrate and Deal with Environmental Issues in Local Transport Policy and Planning

    DEFF Research Database (Denmark)

    Hansen, Carsten Jahn

    2002-01-01

    The article identifies and discuss the capacity to integrate and deal with environmental issues in local transport policy-making and planning processes.......The article identifies and discuss the capacity to integrate and deal with environmental issues in local transport policy-making and planning processes....

  17. The Capacity to Integrate and Deal with Environmental Issues in Local Transport Policy and Planning

    DEFF Research Database (Denmark)

    Hansen, Carsten Jahn

    2002-01-01

    The article identifies and discuss the capacity to integrate and deal with environmental issues in local transport policy-making and planning processes.......The article identifies and discuss the capacity to integrate and deal with environmental issues in local transport policy-making and planning processes....

  18. 75 FR 1802 - Termination of the Environmental Impact Statement for the General Management Plan, Gila Cliff...

    Science.gov (United States)

    2010-01-13

    ... heritage by providing a more unified management approach to the two units of the monument. --Alternative 4... National Park Service Termination of the Environmental Impact Statement for the General Management Plan.... ACTION: Notice of termination of the Environmental Impact Statement for the General Management Plan,...

  19. 76 FR 27087 - Draft Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park

    Science.gov (United States)

    2011-05-10

    ... National Park Service Draft Environmental Impact Statement for the Winter Use Plan, Yellowstone National... Draft Environmental Impact Statement (DEIS) for a Winter Use Plan for Yellowstone National Park, located..., Yellowstone National Park, P.O. Box 168, Yellowstone National Park, Wyoming 82190. If you wish to comment...

  20. Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-02-02

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

  1. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  2. 77 FR 35946 - Notice of Availability for the Final Environmental Impact Statement/Environmental Impact Report...

    Science.gov (United States)

    2012-06-15

    ... Building Los Angeles City Library, San Pedro Branch Los Angeles City Library, Wilmington Branch Los Angeles Public Library, Central Branch Questions or requests concerning the Final EIS/EIR should be directed...

  3. Final Rules for Grandfathered Plans, Preexisting Condition Exclusions, Lifetime and Annual Limits, Rescissions, Dependent Coverage, Appeals, and Patient Protections Under the Affordable Care Act. Final rules.

    Science.gov (United States)

    2015-11-18

    This document contains final regulations regarding grandfathered health plans, preexisting condition exclusions, lifetime and annual dollar limits on benefits, rescissions, coverage of dependent children to age 26, internal claims and appeal and external review processes, and patient protections under the Affordable Care Act. It finalizes changes to the proposed and interim final rules based on comments and incorporates subregulatory guidance issued since publication of the proposed and interim final rules.

  4. 77 FR 53908 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2012-09-04

    ... National Park Service Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone... (Draft SEIS) for a Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and Wyoming... 2012 Supplemental Winter Use Plan EIS), and at Yellowstone National Park headquarters, Mammoth...

  5. Tennessee National Wildlife Refuge: Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Tennessee NWR for the next 15 years. This plan outlines the Refuge vision and purpose...

  6. Windom Wetland Management District: Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Windom Wetland Management District for the next 15 years. This plan outlines the...

  7. Wyandotte National Wildlife Refuge: Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Wyandotte NWR for the next 15 years. This plan outlines the Refuge vision and purpose...

  8. Necedah National Wildlife Refuge: Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Necedah NWR for the next 15 years. This plan outlines the Refuge vision and purpose and...

  9. Presentation of Coastal Environmental Management Plan by using ...

    African Journals Online (AJOL)

    MICHAEL HORSFALL

    ABSTRACT: The provision of environment management plan and formulating the ... determine the planning perspective and problems approach in order to determine bottlenecks respectively. .... Goibar, Sari, Neka, Behshhr and Galogah cities.

  10. Environmental Assessment Revised Hunting Plan Erie National Wildlife Refuge 1987

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In 1984 a serious review of the existing plans led to a decision to completely post the boundary and make the necessary revisions/addendums to the hunting plan that...

  11. Rydell National Wildlife Refuge: Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Rydell NWR for the next 15 years. This plan outlines the Refuge vision and purpose and...

  12. Columbia National Wildlife Refuge: Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Columbia NWR for the next 15 years. This plan outlines the Refuge vision and purpose...

  13. Shiawassee National Wildlife Refuge: Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Shiawassee NWR for the next 15 years. This plan outlines the Refuge vision and purpose...

  14. Geothermal environmental studies, Heber Region, Imperial Valley, California. Environmental baseline data acquisition. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1977-02-01

    The Electric Power Research Institute (EPRI) has been studying the feasibility of a Low Salinity Hydrothermal Demonstration Plant as part of its Geothermal Energy Program. The Heber area of the Imperial Valley was selected as one of the candidate geothermal reservoirs. Documentation of the environmental conditions presently existing in the Heber area is required for assessment of environmental impacts of future development. An environmental baseline data acquisition program to compile available data on the environment of the Heber area is reported. The program included a review of pertinent existing literature, interviews with academic, governmental and private entities, combined with field investigations and meteorological monitoring to collect primary data. Results of the data acquisition program are compiled in terms of three elements: the physical, the biological and socioeconomic settings.

  15. Assessing environmental assets for health promotion program planning: a practical framework for health promotion practitioners.

    Science.gov (United States)

    Springer, Andrew E; Evans, Alexandra E

    2016-01-01

    Conducting a health needs assessment is an important if not essential first step for health promotion planning. This paper explores how health needs assessments may be further strengthened for health promotion planning via an assessment of environmental assets rooted in the multiple environments (policy, information, social and physical environments) that shape health and behavior. Guided by a behavioral-ecological perspective- one that seeks to identify environmental assets that can influence health behavior, and an implementation science perspective- one that seeks to interweave health promotion strategies into existing environmental assets, we present a basic framework for assessing environmental assets and review examples from the literature to illustrate the incorporation of environmental assets into health program design. Health promotion practitioners and researchers implicitly identify and apply environmental assets in the design and implementation of health promotion interventions;this paper provides foundation for greater intentionality in assessing environmental assets for health promotion planning.

  16. 76 FR 38146 - Revision to the Final Principles of Integrated Resource Planning for Use in Resource Acquisition...

    Science.gov (United States)

    2011-06-29

    ... Transmission Planning Group, California Transmission Planning Group, Sierra Subregional Planning Group, and Mid... supplier. e. Environmental impact--the degree to which the resource has an impact on the human environment... transmission path(s) used to get to the contracted location. f. Indian Preference--Under section 2602(d) of...

  17. Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This document presents the Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG) 6 at the Oak Ridge National Laboratory (ORNL). Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and on subsequent discussions with regulators, a decision was made to defer implementing source control remedial measures at the WAG. The alternative selected to address the risks associated with WAG 6 involves maintenance of site access controls prevent public exposure to on-site contaminants, continued monitoring of contaminant releases determine if source control measures are required, and development of technologies that could support the final remediation of WAG 6. Although active source control measures are not being implemented at WAG 6, environmental monitoring is necessary to ensure that any potential changes in contaminant release from the WAG are identified early enough to take appropriate action. Two types of environmental monitoring will be conducted: baseline monitoring and annual routine monitoring. The baseline monitoring will be conducted to establish the baseline contaminant release conditions at the WAG, confirm the site-related chemicals of concern (COCs), and gather data to confirm the site hydrologic model. The baseline monitoring is expected to begin in 1994 and last for 12--18 months. The annual routine monitoring will consist of continued sampling and analyses of COCs to determine off-WAG contaminant flux and risk, identify mills in releases, and confirm the primary contributors to risk. The annual routine monitoring will continue for {approximately} 4 years after completion of the baseline monitoring.

  18. Leading trends in environmental regulation that affect energy development. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Steele, R V; Attaway, L D; Christerson, J A; Kikel, D A; Kuebler, J D; Lupatkin, B M; Liu, C S; Meyer, R; Peyton, T O; Sussin, M H

    1980-01-01

    Major environmental issues that are likely to affect the implementation of energy technologies between now and the year 2000 are identified and assessed. The energy technologies specifically addressed are: oil recovery and processing; gas recovery and processing; coal liquefaction; coal gasification (surface); in situ coal gasification; direct coal combustion; advanced power systems; magnetohydrodynamics; surface oil shale retorting; true and modified in situ oil shale retorting; geothermal energy; biomass energy conversion; and nuclear power (fission). Environmental analyses of these technologies included, in addition to the main processing steps, the complete fuel cycle from resource extraction to end use. A comprehensive survey of the environmental community (including environmental groups, researchers, and regulatory agencies) was carried out in parallel with an analysis of the technologies to identify important future environmental issues. Each of the final 20 issues selected by the project staff has the following common attributes: consensus of the environmental community that the issue is important; it is a likely candidate for future regulatory action; it deals with a major environmental aspect of energy development. The analyses of the 20 major issues address their environmental problem areas, current regulatory status, and the impact of future regulations. These analyses are followed by a quantitative assessment of the impact on energy costs and nationwide pollutant emissions of possible future regulations. This is accomplished by employing the Strategic Environmental Assessment System (SEAS) for a subset of the 20 major issues. The report concludes with a more general discussion of the impact of environmental regulatory action on energy development.

  19. 77 FR 24451 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Science.gov (United States)

    2012-04-24

    ... AGENCY 40 CFR Part 62 Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan...). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve, through direct final rulemaking, Illinois' revised State Plan to control air pollutants from Hazardous/ Medical/Infectious Waste Incinerators (HMIWI...

  20. 77 FR 24405 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Science.gov (United States)

    2012-04-24

    ... AGENCY 40 CFR Part 62 Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan...). ACTION: Direct final rule. SUMMARY: EPA is approving Indiana's revised State Plan to control air pollutants from ``Hazardous/Medical/Infectious Waste Incinerators'' (HMIWI). The Indiana Department of...

  1. Final Environmental Impact Statement C.J. Strike Project Idaho, FERC Project No. 2055

    OpenAIRE

    United States Department of Energy, Federal Energy Regulatory Commission

    2002-01-01

    Idaho Power Company (Idaho Power) filed an application for a new license for the existing C.J. Strike Project located on the Snake River and Bruneau River in Owyhee and Elmore Counties, Idaho, between the towns of Grandview and Bruneau. A major issue in this relicensing proceeding is how project-induced water-level fluctuations from load following operations affect aquatic and terrestrial resources. The final environmental impact statement (final EIS) presents the staff's evaluation of the ...

  2. 76 FR 49786 - Notice of Availability of the Final Environmental Impact Statement/Environmental Impact Report...

    Science.gov (United States)

    2011-08-11

    ... Reclamation (Reclamation), the lead Federal agency, and the California Department of Fish and Game (CDFG), the lead State agency, have prepared a joint Final EIS/EIR for the proposed Nimbus Fish Hatchery Weir... Impact Report (EIS/EIR) for the Nimbus Hatchery Fish Passage Project, Lower American River,...

  3. 78 FR 59659 - Correction to the Final Environmental Impact Statement/Overseas Environmental Impact Statement...

    Science.gov (United States)

    2013-09-27

    ... of the corrected HSTT Final EIS/OEIS are available for public review at the following libraries: 1. Lihue Public Library, 4344 Hardy Street, Lihue, Hawaii 96766. 2. Wailuku Public Library, 251 High Street, Wailuku, Hawaii 96793. 3. Hilo Public Library, 300 Waianuenue Avenue, Hilo, Hawaii 96720. 4....

  4. Final Environmental Impact Report/Environmental Impact Statement. Cullinan Ranch Specific Plan. Chapter 11. Appendix IV.

    Science.gov (United States)

    1984-05-01

    Communications Carper , H.D. June 24, 1983. Director. California Department of .m .Fish and Game. Letter to the City of Vallejo regarding Draft EIR/EIS...Santa Barbara Channel is currently the northern-most breeding site (Briggs et al. 1981). Until 1959, brown pelicans nested as far north as Bird Island

  5. Zachary-Fort Lauderdale pipeline construction and conversion project: final supplement to final environmental impact statement. Docket No. CP74-192

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-05-01

    This Final Supplement to the Final Environmental Impact Statement (Final Supplement) evaluates the economic, engineering, and environmental aspects of newly developed alternatives to an abandonment/conversion project proposed by Florida Gas Transmission Company (Florida Gas). It also updates the staff's previous FEIS and studies revisions to the original proposal. Wherever possible, the staff has adopted portions of its previous FEIS in lieu of reprinting portions of that analysis which require no change. 60 references, 8 figures, 35 tables.

  6. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Science.gov (United States)

    2010-11-17

    ... Group Health Plans and Health Insurance Coverage Relating to Status as a Grandfathered Health Plan Under... and Insurance Oversight, Department of Health and Human Services. ACTION: Amendment to interim final... regulations implementing the rules for group health plans and health insurance coverage in the group and...

  7. Environmental Impact Statement. March 2011. Interim storage, encapsulation and final disposal of spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    2011-07-01

    An Environmental Impact Statement (EIS) shall be prepared and submitted along with applications for permissibility and a licence under the Environmental Code and a licence under the Nuclear Activities Act for new nuclear facilities. This Environmental Impact Statement has been prepared by Svensk Kaernbraenslehantering AB (the Swedish Nuclear Fuel and Waste Management Co, SKB) to be included in the licence applications for continued operation of Clab (central interim storage facility for spent nuclear fuel) in Simpevarp in Oskarshamn Municipality and construction and operation of facilities for encapsulation (integrated with Clab) and final disposal of spent nuclear fuel in Forsmark in Oesthammar Municipality

  8. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    Energy Technology Data Exchange (ETDEWEB)

    D. Vandel

    2003-09-01

    This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

  9. Discerning and Addressing Environmental Failures in Policy Scenarios Using Planning Support System (PSS Technologies

    Directory of Open Access Journals (Sweden)

    Brian Deal

    2016-12-01

    Full Text Available The environmental consequences of planning decisions are often undervalued. This can result from a number of potential causes: (a there might be a lack of adequate information to correctly assess environmental consequences; (b stakeholders might discount the spatial and temporal impacts; (c a failure to understand the dynamic interactions between socio-ecological systems including secondary and tertiary response mechanisms; or (d the gravity of the status quo, i.e., blindly following a traditional discourse. In this paper, we argue that a Planning Support System (PSS that enhances an assessment of environmental impacts and is integral to a community or regional planning process can help reveal the true environmental implications of scenario planning decisions, and thus improve communal planning and decision-making. We demonstrate our ideas through our experiences developing and deploying one such PSS—the Land-use Evolution and impact Assessment Model (LEAM Planning Support System. University of Illinois researchers have worked directly with government planning officials and community stakeholders to analyze alternate future development scenarios and improve the planning process through a participatory, iterative process of visioning, model tuning, simulation, and discussion. The resulting information enables an evaluation of alternative policy or investment choices and their potential environmental implications that can change the way communities both generate and use plans.

  10. Proposals for the National Environmental Health Action Plan Propuestas para el Plan Nacional de Salud y Medio Ambiente

    Directory of Open Access Journals (Sweden)

    Estrella López Martín

    2008-12-01

    Full Text Available According to international strategies for environment and health, the spanish administration of Health and Environment launched in 2007 the necessary mechanisms for developing the National Plan for Health and Environment. The first step was an agreement with the Carlos III Health Institute for designing the basis on which to sus- tain the plan. The scientific committee established for that purpose has drafted a basis-report with the participation of a large group of experts. This work is an abstract of the proposals contained in that report. The proposals refer to the items considered as a priority in the European environment and health strategy, ie, cancer, endocrine disruption, neuro-developmental disorders and respiratory diseases and are organized around the major environmental risk factors for health: water, persistent toxic chemicals, electromagnetic fields, ionizing radiation, noise and climate change and extreme temperatures. To give consistency to the plan, the report identifies some essential measures to ensure its administrative, political, technical and financial feasibility. To give it coherence, the report point to some common priorities and methodological strategies. To give a shape to the plan, the report finally identifies programs to be implemented.De acuerdo con las estrategias internacionales en materia de salud y medio ambiente, los Ministerios de Sanidad y de Medio Ambiente pusieron en marcha en 2007 los mecanismos necesarios para la elaboración del Plan Nacional de Salud y Medio Ambiente. El primer paso ha sido la firma de un acuerdo de encomienda de gestión con el Instituto de Salud Carlos III para que éste diseñara las bases sobre las que sustentar el plan. El comité científico creado al efecto ha redactado un informe de bases para lo que ha contado con el concurso de un nutrido grupo de expertos. Las propuestas que se recogen en el informe constituyen el contenido del presente trabajo. Las propuestas hacen

  11. 76 FR 12103 - Notice of Availability of the Final Site-Wide Environmental Impact Statement for the Y-12...

    Science.gov (United States)

    2011-03-04

    ... Statement for the Y-12 National Security Complex AGENCY: National Nuclear Security Administration, U.S... the Final Site-Wide Environmental Impact Statement for the Y-12 National Security Complex (Final Y-12 SWEIS, DOE/EIS-0387). The Final Y-12 SWEIS analyzes the potential environmental impacts of ongoing...

  12. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 4, Comments and Responses.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This volume of the Initial Northwest Power Act Power Sales Contracts Final Environmental Impact Statement (Final EIS) contains public comments addressing the Initial Northwest Power Act Power Sales Contracts Draft EIS, August 1990 and Bonneville Power Administration`s (BPA) responses. The Introduction provides information about the process BPA follows in addressing these comments. Part I contains a listing of the Alternative Actions evaluated in the Final EIS; Part II is organized by Alternatives and includes summaries of the comments and BPA responses; Part III provides copies of the original comments letters, and, for ease of identification, are coded in the margins according to the alternative(s) addressed.

  13. Environmental planning, ecosystem science, and ecosystem approaches for integrating environment and development

    Science.gov (United States)

    Slocombe, D. Scott

    1993-05-01

    Currently popular concepts such as sustainable development and sustainability seek the integration of environment and development planning. However, there is little evidence that this integration is occurring in either mainstream development planning or environmental planning. This is a function of the history, philosophies, and evolved roles of both. A brief review of the experience and results of mainstream planning, environmental planning, and ecosystem science suggests there is much in past scientific and professional practice that is relevant to the goal of integrated planning for environment and development, but still such commonly recommended reforms as systems and multidisciplinary approaches, institutional integration, and participatory, goal-oriented processes are rarely achieved. “Ecosystem approaches,” as developed and applied in ecology, human ecology, environmental planning, anthropology, psychology, and other disciplines, may provide a more transdisciplinary route to successful integration of environment and development. Experience with ecosystem approaches is reviewed, their advantages and disadvantages are discussed, and they are compared to traditional urban and regional planning, environmental planning, and ecosystem science approaches. Ultimately a synthesis of desirable characteristics for a framework to integrate environment and development planning is presented as a guide for future work and a criterion for evaluating existing programs.

  14. 76 FR 21403 - Notice of Availability of the Final Environmental Impact Statement for the Genesis Project...

    Science.gov (United States)

    2011-04-15

    ...] Notice of Availability of the Final Environmental Impact Statement for the Genesis Project, Eureka County... available for public inspection at the BLM Elko District Office, 3900 E. Idaho Street, Elko, Nevada during...: Newmont Mining Corporation's Genesis- Bluestar mining operations area is located in northeastern Nevada...

  15. 75 FR 51479 - Notice of Availability of the Final Environmental Impact Statement for the Chevron Energy...

    Science.gov (United States)

    2010-08-20

    ... the Environmental Protection Agency's (EPA) Notice of Availability (NOA) of this Final EIS in the... Secretarial Orders 3283 Enhancing Renewable Energy Development on the Public Lands and 3285A1 Renewable Energy... the potential impacts of the project on air quality, biological resources, cultural resources, water...

  16. 75 FR 33273 - Final Environmental Impact Statement (FEIS) for Disposal and Reuse of Fort Monroe, VA

    Science.gov (United States)

    2010-06-11

    ... Department of the Army Final Environmental Impact Statement (FEIS) for Disposal and Reuse of Fort Monroe, VA... socioeconomic impacts associated with the disposal and reuse of Fort Monroe, Virginia. DATES: The waiting period... reuse of Fort Monroe. The 2005 BRAC Commission Report directed the closure of Fort Monroe and...

  17. 75 FR 52969 - Final Environmental Impact Statement; Prisoners Harbor Wetland Restoration, Santa Cruz Island...

    Science.gov (United States)

    2010-08-30

    ... National Park Service Final Environmental Impact Statement; Prisoners Harbor Wetland Restoration, Santa... coastal wetland on Santa Cruz Island, Channel Islands National Park. The requisite no-action ``wait period... restoration of palustrine wetlands and deepwater habitat at Prisoners Harbor, as well as remove a...

  18. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix J: Recreation.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts.

  19. 75 FR 63503 - Notice of Availability of Final Environmental Impact Statement for the Solar Millennium, Amargosa...

    Science.gov (United States)

    2010-10-15

    ... includes the solar fields, power blocks, buildings, parking area, laydown area, stormwater retention pond...] Notice of Availability of Final Environmental Impact Statement for the Solar Millennium, Amargosa Farm Road Solar Power Project, Nye County, NV AGENCY: Bureau of Land Management, Interior. ACTION: Notice...

  20. 76 FR 60815 - Final Legislative Environmental Impact Statement (LEIS) for the Limestone Hills Training Area...

    Science.gov (United States)

    2011-09-30

    ... Department of the Army Final Legislative Environmental Impact Statement (LEIS) for the Limestone Hills... land within the Limestone Hills Training Area (LHTA) from BLM administration. The LEIS proposes that..., mining, recreation, transportation, utility right-of-ways, and wildlife management. A limestone mine...

  1. 77 FR 5505 - Eagle Crest Energy Company; Notice of Availability of the Final Environmental Impact Statement...

    Science.gov (United States)

    2012-02-03

    ... Energy Regulatory Commission Eagle Crest Energy Company; Notice of Availability of the Final Environmental Impact Statement for the Eagle Mountain Pumped Storage Hydroelectric Project In accordance with... of Energy Projects has reviewed the application for license for the Eagle Mountain Pumped...

  2. 77 FR 22361 - Energy Northwest, Columbia Generating Station; Final Supplement 47 to the Generic Environmental...

    Science.gov (United States)

    2012-04-13

    ...) hydroelectric power; (12) ocean wave and current energy; (13) geothermal power; (14) municipal solid waste; (15... Impact Statement for License Renewal of Nuclear Plants AGENCY: Nuclear Regulatory Commission. ACTION: Final Supplement 47 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants...

  3. Relation of Environmental Impact Assessment (EIA and Strategic Environmental Assessment (SEA and the Importance of Strategic Environmental Assessment in Landscape Planning Process

    Directory of Open Access Journals (Sweden)

    Gizem CENGİZ GÖKÇE

    2015-07-01

    Full Text Available The main goal in the countries which have not completed their development progress is industrialization and development just as soon as possible. Therefore, negative effects of industrialization and development on envi ronment and/or nature cannot be mostly discussed adequately. One of the planning approach instruments that targets sustainability, Environmental Impact Assessment (EIA is used in many countries effectively. But in recent years, that has understood; EIA is an impact assessment instrument that contains defensive preventions only on the basis of projects and this situation has caused some concerns against EIA. In this direction, Strategical Environmental Assessment (SEA exists as the final point of the instruments which are formed to provide sustainable development . In this study; the importance and the requirement of effectively taking a role of landscape architectures that have ecological based job, in the SEA workings which isn’t have got a legal status in Turkey yet, are emphasized by reviewing the relations between EIA and SEA concepts.

  4. Health and safety plan for operations performed for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  5. Final work plan : investigation of potential contamination at the former USDA facility in Ramona, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work that will be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Ramona, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential source areas on the property, (2) determine the vertical and horizontal extent of potential contamination, and (3) provide recommendations for future actions, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the United States Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy. Under the Intergovernmental Agreement, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. The Master Work Plan was approved by the KDHE. It contains materials common to investigations at locations in Kansas and should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Ramona.

  6. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  7. Review and assessments of potential environmental, health and safety impacts of MHD technology. Final draft

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    The purpose of this document is to develop an environmental, health and safety (EH and S) assessment and begin a site - specific assessment of these and socio - economic impacts for the magnetohydrodynamics program of the United States Department of Energy. This assessment includes detailed scientific and technical information on the specific EH and S issues mentioned in the MHD Environmental Development Plan. A review of current literature on impact-related subjects is also included. This document addresses the coal-fired, open-cycle MHD technology and reviews and assesses potential EH and S impacts resulting from operation of commercially-installed technology.

  8. Community-Level Environmental Projects as Learning Tools for Planners: A Case Study of Graduate Planning Students

    Science.gov (United States)

    Portman, Michelle E.; Teff-Seker, Yael

    2017-01-01

    Despite the potential environmental impact of urban planning, there is little research on Environmental Education (EE) in the context of urban planning curricula. This study follows graduate planning students' learning experience during group projects assigned as part of a planning course at the Technion--Israel Institute of Technology. These…

  9. Community-Level Environmental Projects as Learning Tools for Planners: A Case Study of Graduate Planning Students

    Science.gov (United States)

    Portman, Michelle E.; Teff-Seker, Yael

    2017-01-01

    Despite the potential environmental impact of urban planning, there is little research on Environmental Education (EE) in the context of urban planning curricula. This study follows graduate planning students' learning experience during group projects assigned as part of a planning course at the Technion--Israel Institute of Technology. These…

  10. 2013 Nutrition Risk Research Plan Review Final Report. Research Plan Review for: The Risk Factor of Inadequate Nutrition

    Science.gov (United States)

    2014-01-01

    The 2013 Nutrition Risk Standing Review Panel (from here on referred to as the SRP) was impressed by the degree of progress the nutrition discipline has made with the research plan presented since the 2012 Nutrition Risk SRP WebEx/teleconference. The scientists and staff associated with the nutrition discipline have, in addition, continued their impressive publication track record. Specifically the SRP found that the novel and important progress in the ocular health research area (Gap N7.3) represents an important advance in understanding the etiology and potential countermeasures for this condition and thinks that the work will not only be valuable for vision, but may have implications for cardiovascular health, as well. The SRP also considered the bone countermeasure data presented a potentially valuable tool for investigating bone metabolism under the unique conditions of space travel, specifically the innovation of variable use of stable Ca isotopes for bone synthesis and equal contribution for bone to investigate bone metabolism, as well as, the impact of the advanced resistive exercise device (ARED) on body composition during spaceflight. Finally, the SRP considers the planned Integrated Nutrition task to be an important and necessary strategic part of the research plan. The SRP is concerned that the risks observed in previous research on Low Earth Orbit (LEO) may not capture all the risks of longer duration flight beyond LEO. In particular, the SRP believes that there may be a much greater likelihood of an intensified chronic inflammatory response compared to the very minimal evidence seen to date and that modest effects seen in LEO, such as the reduction in appetite, may not predict an absence in longer duration flight out of LEO. The added complications of longer duration flight, greater bio-behavioral stress, radiation exposure, poorer communication, and inability to respond to unforeseen exigencies may create different risks. Thus, preparation for

  11. Contemplating ‘Quality Street’ : integration of environmental quality in planning sustainable urban development

    NARCIS (Netherlands)

    van Stigt, M.

    2016-01-01

    The challenge of sustainable urban development entails integration of environmental interests in decision-making about urban plans. In practice, this is not always successful. This dissertation offers explanations and suggests some strategies for further improvement. Three different perspectives are

  12. 78 FR 23778 - Quivira National Wildlife Refuge, Stafford, KS; Comprehensive Conservation Plan and Environmental...

    Science.gov (United States)

    2013-04-22

    ... Fish and Wildlife Service Quivira National Wildlife Refuge, Stafford, KS; Comprehensive Conservation Plan and Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of... fish and wildlife management, conservation, legal mandates, and our policies. In addition to...

  13. Strategic Plan for Sustainable Energy Management and Environmental Stewardship for Los Angeles Unified School District

    Energy Technology Data Exchange (ETDEWEB)

    Walker, A.; Beattie, D.; Thomas, K.; Davis, K.; Sim, M.; Jhaveri, A.

    2007-11-01

    This Strategic Plan for Sustainable Energy Management and Environmental Stewardship states goals, measures progress toward goals and how actions are monitored to achieve continuous improvement for the Los Angeles Unified School District.

  14. Environmental Action Statement : [Northern Tallgrass Prairie National Wildlife Refuge Hunting Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Environmental Action Statement for the Northern Tallgrass Prairie NWR Hunting Plan states that the hunting program is not found to have significant...

  15. Standard Guide for Environmental Monitoring Plans for Decommissioning of Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide covers the development or assessment of environmental monitoring plans for decommissioning nuclear facilities. This guide addresses: (1) development of an environmental baseline prior to commencement of decommissioning activities; (2) determination of release paths from site activities and their associated exposure pathways in the environment; and (3) selection of appropriate sampling locations and media to ensure that all exposure pathways in the environment are monitored appropriately. This guide also addresses the interfaces between the environmental monitoring plan and other planning documents for site decommissioning, such as radiation protection, site characterization, and waste management plans, and federal, state, and local environmental protection laws and guidance. This guide is applicable up to the point of completing D&D activities and the reuse of the facility or area for other purposes.

  16. Elk and Deer Management Plan and Environmental Assessment : Fort Niobrara National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Elk and Deer Management Plan and Environmental Assessment (EDMP/EA) is to develop and evaluate alternative actions for management of elk and deer...

  17. Evaluation of black-billed magpies as monitors of environmental contamination : Work plan 1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Preliminary proposal and work plan for the project "Evaluation of Black-billed Magpies as Indicators of Environmental Contamination at the Rocky Mountain Arsenal"....

  18. Environmental Management Systems: A Framework for Planning Green Campuses.

    Science.gov (United States)

    Keniry, Julian

    2003-01-01

    Drawing on recent survey data from the National Wildlife Federation and other publications, explains what an environmental management system is and identifies its components; examines how environmental management systems have been applied in higher education settings; reports on trends in implementation; and illustrates how the environmental…

  19. The Effect of Considering Environmental Aspect to Distribution Planning: A Case in Logistics SME

    Science.gov (United States)

    Prambudia, Yudha; Andrian Nur, Andri

    2016-01-01

    Environmental aspect is often neglected in traditional distribution planning process of a product. Especially in small-medium enterprises (SME) of developing countries where cost efficiency is the predominant factor. Bearing in mind that there is a large number of SME's performing logistics activities, the consideration of environmental aspect in their distribution planning process would be beneficial to climate change mitigation efforts. The purpose of this paper is to show the impact of environmental aspect should it be considered as a contributing factor in distribution planning. In this research, an adoption of CO2-emission factor in an SME's distribution planning in Indonesia was simulated. The outputs of distribution planning with and without the factor consideration are then compared. The result shows that adoption of CO2-emission factor would change the priority of delivery route.

  20. Marine spatial planning and Good Environmental Status: a perspective on spatial and temporal dimensions

    Directory of Open Access Journals (Sweden)

    Alison J. Gilbert

    2015-03-01

    Full Text Available The European Union Marine Strategy Framework Directive requires the Good Environmental Status of marine environments in Europe's regional seas; yet, maritime activities, including sources of marine degradation, are diversifying and intensifying in an increasingly globalized world. Marine spatial planning is emerging as a tool for rationalizing competing uses of the marine environment while guarding its quality. A directive guiding the development of such plans by European Union member states is currently being formulated. There is an undeniable need for marine spatial planning. However, we argue that considerable care must be taken with marine spatial planning, as the spatial and temporal scales of maritime activities and of Good Environmental Status may be mismatched. We identify four principles for careful and explicit consideration to align the requirements of the two directives and enable marine spatial planning to support the achievement of Good Environmental Status in Europe's regional seas.