WorldWideScience

Sample records for period procurement testing

  1. United Kingdom's defence procurement: a period of smart enlightenment or halting culture

    OpenAIRE

    O Callaghan, D. M.

    2001-01-01

    The aim of this thesis is to map predominant cultures and examine their compatibility with the Smart Procurement Initiative. An initiative that was identified in the Strategic Defence Review to address the limitations of UK's defence procurement process that had previously failed to deliver defence equipment to cost, time and specification. The introduction reviews those factors, which influenced procurement since World War 11. The background to UK's current procurement process...

  2. Quality assurance aspects of the major procurements for the Large Coil Test Facility

    International Nuclear Information System (INIS)

    Taylor, D.J.; Thompson, P.B.; Ryan, T.L.; Queen, C.C.; Halstead, E.L.; Murphy, J.L.; Wood, R.J.

    1983-01-01

    The Large Coil Test Facility (LCTF) project is comprised of the test stand, supporting cryogenic systems, instrumentation, data acquisition, and utilities necessary for testing the large superconducting coils of the Large Coil Program (LCP). A significant portion of the facility hardware has been obtained through procurement actions with industrial suppliers. This paper addresses the project's experience in formulation and execution of quality assurance (QA) actions relative to several of the major items procured. Project quality assurance planning and specific features related to procurement activities for several of the more specialized test facility components are described. These component procurements include: (1) the coil test stand's major structural item (the bucking post) purchased from foreign industry; (2) fabrication and testing of high-current power supplies; (3) industrial fabrication of specialized instrumentation (voltage-tap signal conditioning modules); and (4) fabrication, installation, and testing of the liquid helium piping system

  3. An improved test for periodicity

    International Nuclear Information System (INIS)

    Davies, S.R.

    1990-01-01

    I discuss two widely used methods of testing for periodicity, phase dispersion minimization and epoch-folding. Using an analysis of variance approach, I demonstrate the close relationship between these two methods. I also show that the significance test sometimes used in phase dispersion minimization is statistically inaccurate, and that the test used in epoch-folding is an approximation valid only for large sample sizes. I propose a new test statistic, applicable to either epoch-folding or PDM, which is statistically sound for all sample sizes, and which is also more sensitive to periodicity than the test statistics previously used with these two methods. (author)

  4. Periodic testing in operative action

    International Nuclear Information System (INIS)

    Larm, T.

    2005-01-01

    Periodic testing forms a remarkable part of the regular work tasks of the shift crew. Testing is generally carried out beside the daily monitoring and control work. Even remarkable plant related differences may occur in the procedures and routines used in periodic testing. The goal is still always the same, to regularly ensure that the systems and equipment are in working order according to their design. This presentation studies with examples the execution and scope of periodic testing as well as the routines and procedures used in the testing in Loviisa power plant. The presentation is based on the testing procedures of Loviisa power plant and the aim is not to compare them to the procedures of other plants. The scope of periodic testing has increased and the routines and procedures have been developed as the operation experience has increased. The assessment of the need of periodic testing and the consideration of the practical execution possibilities should be a part of the plant's planning phase as a part of the planning process. (orig.)

  5. Availability of periodically tested systems

    International Nuclear Information System (INIS)

    Signoret, J.P.

    1979-01-01

    There is at the present time a need in accurate models to asess the availability of periodically tested stand-by systems. This paper shows how to improve the well known 'saw-tooth curve' model in order to take into account various reliability parameters. A model is developed to assess the pointwise and the mean availabilities of periodically tested stand-by systems. Exact and approxination formulae are given. In addition, the model developed herein leads to optimize the test interval in order to minimize the mean unavailability. A safety diesel in a nuclear power plant is given as an example

  6. Optimal Sizing of Energy Storage Systems for the Energy Procurement Problem in Multi-Period Markets under Uncertainties

    Directory of Open Access Journals (Sweden)

    Ryusuke Konishi

    2018-01-01

    Full Text Available In deregulated electricity markets, minimizing the procurement costs of electricity is a critical problem for procurement agencies (PAs. However, uncertainty is inevitable for PAs and includes multiple factors such as market prices, photovoltaic system (PV output and demand. This study focuses on settlements in multi-period markets (a day-ahead market and a real-time market and the installation of energy storage systems (ESSs. ESSs can be utilized for time arbitrage in the day-ahead market and to reduce the purchasing/selling of electricity in the real-time market. However, the high costs of an ESS mean the size of the system needs to be minimized. In addition, when determining the size of an ESS, it is important to identify the size appropriate for each role. Therefore, we employ the concept of a “slow” and a “fast” ESS to quantify the size of a system’s role, based on the values associated with the various uncertainties. Because the problem includes nonlinearity and non-convexity, we solve it within a realistic computational burden by reformulating the problem using reasonable assumptions. Therefore, this study identifies the optimal sizes of ESSs and procurement, taking into account the uncertainties of prices in multi-period markets, PV output and demand.

  7. Testing periodically integrated autoregressive models

    NARCIS (Netherlands)

    Ph.H.B.F. Franses (Philip Hans); M.J. McAleer (Michael)

    1997-01-01

    textabstractPeriodically integrated time series require a periodic differencing filter to remove the stochastic trend. A non-periodic integrated time series needs the first-difference filter for similar reasons. When the changing seasonal fluctuations for the non-periodic integrated series can be

  8. Procurement specification high vacuum test chamber and pumping system

    International Nuclear Information System (INIS)

    1976-01-01

    The specification establishes requirements for a high-vacuum test chamber, associated vacuum pumps, valves, controls, and instrumentation that shall be designed and fabricated for use as a test chamber for testing a closed loop Brayton Isotope Power System (BIPS) Ground Demonstration System (GDS). The vacuum system shall include all instrumentation required for pressure measurement and control of the vacuum pumping system. A general outline of the BIPS-GDS in the vacuum chamber and the preliminary piping and instrumentation interface to the vacuum chamber are shown

  9. Hybrid Design, Procurement and Testing for the LHCb Silicon Tracker

    CERN Document Server

    Bay, A; Frei, R; Jiménez-Otero, S; Perrin, A; Tran, MT; Van Hunen, J J; Vervink, K; Vollhardt, A; Agari, M; Bauer, C; Blouw, J; Hofmann, W; Knöpfle, K T; Löchner, S; Schmelling, M; Schwingenheuer, B; Smale, N J; Adeva, B; Esperante-Pereira, D; Lois, C; Vázquez, P; Lehner, F; Bernhard, R P; Bernet, R; Gassner, J; Köstner, S; Needham, M; Steinkamp, O; Straumann, U; Volyanskyy, D; Voss, H; Wenger, A

    2005-01-01

    The Silicon Tracker of the LHCb experiment consists of four silicon detector stations positioned along the beam line of the experiment. The detector modules of each station are constructed from wide pitch silicon microstrip sensors. Located at the module's end, a polyimide hybrid is housing the front-end electronics. The assembly of the more than 600 hybrids has been outsourced to industry. We will report on the design and production status of the hybrids for the LHCb Silicon Tracker and describe the quality assurance tests. Particular emphasis is laid on the vendor qualifying and its impact on our hybrid design that we experienced during the prototyping phase.

  10. THWARTING THE "MERCHANTS OF DEATH" ACCUSATION: THE POLITICAL ECONOMY OF MILITARY PROCUREMENT IN INDUSTRIAL DEMOCRACIES DURING THE INTERWAR PERIOD

    Directory of Open Access Journals (Sweden)

    Jari Eloranta

    2010-01-01

    Full Text Available This article charts the interwar military procurement practices of several democratic states, concentrating on the United States, the United Kingdom, Sweden, and Finland. In addition to comparing some of the foundations of the Allies' successful industrial mobilization in World War II, this article concludes that interwar procurement practices in some of the most liberal democracies were surprisingly resistant to capture by business interests. This finding suggests that in describing this era, we should be cautious about ascribing causal power to trans-historical economic behaviors such as rent-seeking and collusion, without taking into account the institutional setting in which such activities took place. The record of the interwar period suggests that democracies can use bureaucratic administration and public enterprise to establish robust barriers to rent-seeking and corruption in the military economy. During the interwar period, these administrative barriers were erected in conjunction with intense public concern about military profiteering. Whether they would be less effective in different ideological environments deserves further investigation.

  11. Qualification test results for DOE solar photovoltaic flat panel procurement - PRDA 38

    Science.gov (United States)

    Griffith, J. S.

    1980-01-01

    Twelve types of prototypes modules for the DOE Photovoltaic Flat Panel Procurement (PRDA 38) were subjected to qualification tests at the Jet Propulsion Laboratory according to a new specification. Environmental exposures were carried out separately and included temperature cycling, humidity, wind simulation, and hail. The most serious problems discovered were reduced insulation resistance to ground and ground continuity of the metal frames, electrical degradation, erratic power readings, and delamination. The electrical and physical characteristics of the newly received modules are also given.

  12. 49 CFR 236.588 - Periodic test.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Periodic test. 236.588 Section 236.588..., Train Control and Cab Signal Systems Inspection and Tests; Locomotive § 236.588 Periodic test. Except as provided in § 236.586, periodic test of the automatic train stop, train control, or cab signal apparatus...

  13. Periodical test program in depth revision

    International Nuclear Information System (INIS)

    Feltin, C.; Zermizoglou, R.

    1987-11-01

    Inspection visits made to different sites during 1980 and 1981 evidenced the need to extend and define more precisely the periodical tests performed on safety related systems; thus Electricite de France was requested by the Safety Authorities to re-examine the periodical test program for all safety related systems. This paper presents the methodology adopted by Electricite de France in order to perform an exhaustive analysis of the periodical test program for the 900 and 1300 MWe plants, and the organization set up at the IPSN at one hand and Electricite de France on the other hand for the purpose of elaborating a periodical test program which would be ratified by the Safety Authorities

  14. Global survey of malaria rapid diagnostic test (RDT) sales, procurement and lot verification practices: assessing the use of the WHO-FIND Malaria RDT Evaluation Programme (2011-2014).

    Science.gov (United States)

    Incardona, Sandra; Serra-Casas, Elisa; Champouillon, Nora; Nsanzabana, Christian; Cunningham, Jane; González, Iveth J

    2017-05-15

    Malaria rapid diagnostic tests (RDTs) play a critical role in malaria case management, and assurance of quality is a key factor to promote good adherence to test results. Since 2007, the World Health Organization (WHO) and the Foundation for Innovative New Diagnostics (FIND) have coordinated a Malaria RDT Evaluation Programme, comprising a pre-purchase performance evaluation (product testing, PT) and a pre-distribution quality control of lots (lot testing, LT), the former being the basis of WHO recommendations for RDT procurement. Comprehensive information on malaria RDTs sold worldwide based on manufacturers' data and linked to independent performance data is currently not available, and detailed knowledge of procurement practices remains limited. The use of the PT/LT Programme results as well as procurement and lot verification practices were assessed through a large-scale survey, gathering product-specific RDT sales and procurement data (2011-14 period) from a total of 32 manufacturers, 12 procurers and 68 National Malaria Control Programmes (NMCPs). Manufacturers' reports showed that RDT sales had more than doubled over the four years, and confirmed a trend towards increased compliance with the WHO procurement criteria (from 83% in 2011 to 93% in 2014). Country-level reports indicated that 74% of NMCPs procured only 'WHO-compliant' RDT products, although procurers' transactions datasets revealed a surprisingly frequent overlap of different products and even product types (e.g., Plasmodium falciparum-only and Plasmodium-pan) in the same year and country (60 and 46% of countries, respectively). Importantly, the proportion of 'non-complying' (i.e., PT low scored or not evaluated) products was found to be higher in the private health care sector than in the public sector (32% vs 5%), and increasing over time (from 22% of private sector sales in 2011 to 39% in 2014). An estimated 70% of the RDT market was covered by the LT programme. The opinion about the PT

  15. ITER blanket module connectors. Design, analysis and testing for procurement arrangement

    International Nuclear Information System (INIS)

    Khomiakov, S.; Poddubnyi, I.; Kolganov, V.; Zhmakin, A.; Parshutin, E.; Danilov, I.; Strebkov, Yu.; Skladnov, K.; Vlasov, D.; Cheburova, A.; Romannikov, A.; Raffray, R.; Egorov, K.; Chappuis, Ph.; Sadakov, S.; Calcagno, B.; Roccella, R.

    2016-01-01

    Highlights: • Procurement Arrangement on Blanket Module Connections (BMC) was signed by ITER Organization and Russian Federation Domestic Agency in late 2014. • “N.A. Dollezhal Research and Development Institute of Power Engineering” (NIKIET) was selected as a general supplier of BMC. • NIKIET plays a key role in design development, analytical and experimental justification and manufacturing of BMC. • NIKIET shall fabricate, test and deliver to ITER 2109 flexible supports, 2561 pads, 1053 electrical straps and 1053 pedestals. - Abstract: A standard ITER Blanket module (BM) is attached to the Vacuum Vessel (VV) with a special system of Blanket Module Connections (BMCs) comprising flexible supports, insulating key pads and electrical straps. BMCs fix the modules relative to the VV and manage the current flow. They accommodate transient, cyclic, thermal and electro-magnetic (EM) loads in a vacuum environment and under neutron radiation. Dynamic, thermal-structural and strength analyses have been performed in support of the BMC design and the results have been experimentally confirmed. The components with uncertain behavior including partially and non-preloaded threads, insulation coating, and electrical contacts were designed by experiments. The effort to develop a reliable and robust design of the BMCs in time for the signature of the Procurement Arrangement on BMCs between ITER Organization and Russian Federation in late 2014 spanned several years. It includes design and analysis as well as experimental activities by the ITER Organization and by JSC “NIKIET” (Russia), which, as an affirmed subcontractor will manufacture and supply BMCs to the ITER site. This paper summarizes the overall effort focusing in particular on the more recent PA supporting activities.

  16. ITER blanket module connectors. Design, analysis and testing for procurement arrangement

    Energy Technology Data Exchange (ETDEWEB)

    Khomiakov, S., E-mail: khomias58@mail.ru [Joint-Stock Company “N.A. Dollezhal Research and Development Institute of Power Engineering”, 107140, Malaya Krasnoselskaya Str. 2/8, Moscow (Russian Federation); Poddubnyi, I.; Kolganov, V.; Zhmakin, A.; Parshutin, E.; Danilov, I.; Strebkov, Yu.; Skladnov, K.; Vlasov, D.; Cheburova, A. [Joint-Stock Company “N.A. Dollezhal Research and Development Institute of Power Engineering”, 107140, Malaya Krasnoselskaya Str. 2/8, Moscow (Russian Federation); Romannikov, A. [Institution “Project Center ITER”, 123098, Academic Kurchatov' s Sq.,1, Moscow (Russian Federation); Raffray, R.; Egorov, K.; Chappuis, Ph.; Sadakov, S.; Calcagno, B.; Roccella, R. [ITER Organization, Route de Vinon sur Verdon, 13067 St. Paul-Lez-Durance (France)

    2016-11-01

    Highlights: • Procurement Arrangement on Blanket Module Connections (BMC) was signed by ITER Organization and Russian Federation Domestic Agency in late 2014. • “N.A. Dollezhal Research and Development Institute of Power Engineering” (NIKIET) was selected as a general supplier of BMC. • NIKIET plays a key role in design development, analytical and experimental justification and manufacturing of BMC. • NIKIET shall fabricate, test and deliver to ITER 2109 flexible supports, 2561 pads, 1053 electrical straps and 1053 pedestals. - Abstract: A standard ITER Blanket module (BM) is attached to the Vacuum Vessel (VV) with a special system of Blanket Module Connections (BMCs) comprising flexible supports, insulating key pads and electrical straps. BMCs fix the modules relative to the VV and manage the current flow. They accommodate transient, cyclic, thermal and electro-magnetic (EM) loads in a vacuum environment and under neutron radiation. Dynamic, thermal-structural and strength analyses have been performed in support of the BMC design and the results have been experimentally confirmed. The components with uncertain behavior including partially and non-preloaded threads, insulation coating, and electrical contacts were designed by experiments. The effort to develop a reliable and robust design of the BMCs in time for the signature of the Procurement Arrangement on BMCs between ITER Organization and Russian Federation in late 2014 spanned several years. It includes design and analysis as well as experimental activities by the ITER Organization and by JSC “NIKIET” (Russia), which, as an affirmed subcontractor will manufacture and supply BMCs to the ITER site. This paper summarizes the overall effort focusing in particular on the more recent PA supporting activities.

  17. GSA On-Line Procurement Programs Lack Documentation and Reliability Testing

    National Research Council Canada - National Science Library

    Perry, Stephen

    2001-01-01

    .... For example, as part of an effort to improve the functioning of the government and achieve efficiencies of operations, the President has requested agencies to expand their use of on-line procurement in fiscal year 2OO2...

  18. Testing the EFQM model as a framework to measure a company’s procurement performance

    OpenAIRE

    Belvedere, Valeria; Grando, Alberto; Legenvre, Hervé

    2018-01-01

    This paper aims at checking whether the European Foundation for Quality Management (EFQM) Business Excellence Model (BEM) can be used as a reference framework for designing a multi-objective performance measurement system (PMS) for the procurement function. The procurement function is becoming increasingly relevant in the achievement of strategic and economic objectives. Thus, understanding the level of maturity of the practices implemented and identifying improvement opportunities are crucia...

  19. Point-of-care testing in an organ procurement organization donor management setting.

    Science.gov (United States)

    Baier, K A; Markham, L E; Flaigle, S P; Nelson, P W; Shield, C F; Muruve, N A; Aeder, M I; Murillo, D; Bryan, C F

    2003-01-01

    Our organ procurement organization (OPO) evaluated the clinical and financial efficacy of point-of-care testing (POCT) in management of our deceased organ donors. Before we implemented point-of care testing with the i-STAT into routine clinical donor management, we compared the i-STAT result with the result from the respective donor hospital lab (DHL) for certain analytes on 15 consecutive donors in our OPO from 26 March to 14 May 2001. The financial impact was studied by reviewing 77 donors from July 2001 to March 2002. There was a strong correlation for each analyte between the POC and DHL test results with r-values as follows: pH 0.86; PCO2 = 0.96; PO2 = 0.98; sodium = 0.98; potassium = 0.95; chloride = 0.94; BUN = 0.98; glucose = 0.92; haematocrit = 0.87 and creatinine = 0.95. Since our OPO coordinators began using i-STAT in their routine clinical management of organ donors, they can now more quickly maximize oxygenation and fluid management of the donor and make extra-renal placement calls sooner. Finally, since we are no longer being billed for the testing performed on the i-STAT, average financial savings to our OPO are US dollars 733 per case. Point-of-care testing in management of our OPO donors provides a result that is equivalent to that of the donor hospital lab, has quicker turn-around time than the donor hospital laboratory, allowing more immediate clinical management decisions to be made so that extra-renal offers may begin sooner.

  20. Organ Procurement and Transplantation Network; final rule revision of comment period and effective dates--HRSA. Extension of comment period and delay of effective date for the Organ Procurement and Transplantation Network.

    Science.gov (United States)

    1998-07-01

    This document sets forth the revisions required by the Fiscal Year 1998 Supplemental Appropriations Act, Public Law 105-174, signed into law by the President on May 1, 1998. Section 4002 of that Act states that public comments on the Organ Procurement and Transplantation Network (OPTN) Final Rule are permitted until August 31, 1998, and that the OPTN rule will not become effective before October 1, 1998. This document is provided to notify the public about these provisions and to make corresponding changes to the regulation.

  1. Application of quality assurance to the design, procurement and construction of the fast flux test facility

    International Nuclear Information System (INIS)

    Garland, D.L.; Glasscock, R.B.

    1978-01-01

    Experience has clearly demonstrated the need for effective quality assurance programmes throughout the design, procurement and construction phases of the Fast Flux Test Facility (FFTF). Formal quality assurance programmes for FFTF have contributed significantly to the achievement of project objectives thus far in a safe, reliable and predictable manner. Quality assurance programmes empolyed by major FFTF Project participants are based on the requirements of RDT Standard F 2-2, one of the first and most comprehensive standards of its kind. RDT F 2-2 is similar in its basic requirements to ANSI N45.2 and other quality assurance programme standards but differs in its degree of specificity, particularly in its coverage of development activities. RDT F 2-2 is widely applied to a variety of large and small nuclear energy development projects and technology programmes. Full implementation of RDT F 2-2 across the FFTF Project has had its problems and rewards. Problems have been encountered involving misinterpretation or overapplication of requirements. In some instances the problems pointed to the need for more specific requirements, and so the standard was amended to rectify the shortcomings. One valuable lesson learned is that feedback of use experience is essential to the development of a living, viable standard which can be beneficially applied to other projects. Benefits and cost savings have accrued from the preventive aspects of RDT F 2-2. Some examples of experiences and resulting amendments to RDT F 2-2, and their favourable impact on facility costs and schedule, are discussed in this paper. (author)

  2. Transfer of Air Force technical procurement bid set data to small businesses, using CALS and EDI: Test report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-08-15

    This report documents a test transfer of three Air Force technical procurement bid sets to one large and twelve small businesses, using the Department of Defense (DoD) Continuous Acquisition and Life-cycle Support (CALS) and ANSI ASC X12 Electronic Data Interchange (EDI) standards. The main goal of the test was to evaluate the effectiveness of using CALS technical data within the context of the DoD`s EDI-based standard approach to electronic commerce in procurement, with particular emphasis on receipt and use of the data by small contractors. Air Force procurement data was provided by the Sacramento Air Logistics Center at McClellan Air Force Base; the manufacturing participants were selected from among McClellan`s ``Blue Ribbon`` contractors, located throughout the US. The test was sponsored by the Air Force CALS Test Network, headquartered at Wright-Patterson Air Force Base. The test successfully demonstrated the technical feasibility of including CALS MIL-R-28002 (Raster) engineering data in an EDI Specification/Technical Information transaction set (ANSI ASC X12 841) when issuing electronic requests for quotation to small businesses. In many cases, the data was complete enough for the contractor participant to feel comfortable generating a quote. Lessons learned from the test are being fed back to the CALS and EDI standards organizations, and to future implementors of CALS-EDI based acquisition or contracting systems, which require the transfer of technical information, such as engineering data, manufacturing process data, quality test data, and other product or process data, in the form of a CALS or other digital datafile.

  3. A highly specific test for periodicity

    Energy Technology Data Exchange (ETDEWEB)

    Ansmann, Gerrit, E-mail: gansmann@uni-bonn.de [Department of Epileptology, University of Bonn, Sigmund-Freud-Straße 25, 53105 Bonn (Germany); Helmholtz Institute for Radiation and Nuclear Physics, University of Bonn, Nussallee 14–16, 53115 Bonn (Germany); Interdisciplinary Center for Complex Systems, University of Bonn, Brühler Straße 7, 53175 Bonn (Germany)

    2015-11-15

    We present a method that allows to distinguish between nearly periodic and strictly periodic time series. To this purpose, we employ a conservative criterion for periodicity, namely, that the time series can be interpolated by a periodic function whose local extrema are also present in the time series. Our method is intended for the analysis of time series generated by deterministic time-continuous dynamical systems, where it can help telling periodic dynamics from chaotic or transient ones. We empirically investigate our method's performance and compare it to an approach based on marker events (or Poincaré sections). We demonstrate that our method is capable of detecting small deviations from periodicity and outperforms the marker-event-based approach in typical situations. Our method requires no adjustment of parameters to the individual time series, yields the period length with a precision that exceeds the sampling rate, and its runtime grows asymptotically linear with the length of the time series.

  4. A highly specific test for periodicity

    International Nuclear Information System (INIS)

    Ansmann, Gerrit

    2015-01-01

    We present a method that allows to distinguish between nearly periodic and strictly periodic time series. To this purpose, we employ a conservative criterion for periodicity, namely, that the time series can be interpolated by a periodic function whose local extrema are also present in the time series. Our method is intended for the analysis of time series generated by deterministic time-continuous dynamical systems, where it can help telling periodic dynamics from chaotic or transient ones. We empirically investigate our method's performance and compare it to an approach based on marker events (or Poincaré sections). We demonstrate that our method is capable of detecting small deviations from periodicity and outperforms the marker-event-based approach in typical situations. Our method requires no adjustment of parameters to the individual time series, yields the period length with a precision that exceeds the sampling rate, and its runtime grows asymptotically linear with the length of the time series

  5. Building Procurement

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2007-01-01

    evolves from a simple establishment of a contractual relationship to a central and strategic part of construction. The authors relate to cultural, ethical and social and behavioural sciences as the fundamental basis for analysis and understanding of the complexity and dynamics of the procurement system......‘The procurement of construction work is complex, and a successful outcome frequently elusive’. With this opening phrase of the book, the authors take on the challenging job of explaining the complexity of building procurement. Even though building procurement systems are, and will remain, complex...... despite this excellent book, the knowledge, expertise, well-articulated argument and collection of recent research efforts that are provided by the three authors will help to make project success less elusive. The book constitutes a thorough and comprehensive investigation of building procurement, which...

  6. 46 CFR 61.40-6 - Periodic safety tests.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Periodic safety tests. 61.40-6 Section 61.40-6 Shipping... INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-6 Periodic safety tests. (a) Periodic Safety tests must demonstrate the proper operation of the primary and alternate...

  7. Testing for entanglement with periodic coarse graining

    Science.gov (United States)

    Tasca, D. S.; Rudnicki, Łukasz; Aspden, R. S.; Padgett, M. J.; Souto Ribeiro, P. H.; Walborn, S. P.

    2018-04-01

    Continuous-variable systems find valuable applications in quantum information processing. To deal with an infinite-dimensional Hilbert space, one in general has to handle large numbers of discretized measurements in tasks such as entanglement detection. Here we employ the continuous transverse spatial variables of photon pairs to experimentally demonstrate entanglement criteria based on a periodic structure of coarse-grained measurements. The periodization of the measurements allows an efficient evaluation of entanglement using spatial masks acting as mode analyzers over the entire transverse field distribution of the photons and without the need to reconstruct the probability densities of the conjugate continuous variables. Our experimental results demonstrate the utility of the derived criteria with a success rate in entanglement detection of ˜60 % relative to 7344 studied cases.

  8. HIV testing during the neonatal period

    African Journals Online (AJOL)

    2015-04-24

    Apr 24, 2015 ... transmission interventions on 6-week HIV polymerase ... and daily dose nevirapine (NVP) infant prophylaxis (Option B or B+) ... out other antiretrovirals, 32% of intrapartum-infected infants tested HIV DNA PCR negative.

  9. Interim Results of a National Test of the Rapid Assessment of Hospital Procurement Barriers in Donation (RAPiD)

    Science.gov (United States)

    Traino, H. M.; Alolod, G. P.; Shafer, T.; Siminoff, L. A.

    2012-01-01

    Organ donation remains a major public health challenge with over 114 000 people on the waitlist in the United States. Among other factors, extant research highlights the need to improve the identification and timely referral of potential donors by hospital health-care providers (HCPs) to organ procurement organizations (OPOs). We implemented a national test of the Rapid Assessment of hospital Procurement barriers in Donation (RAPiD) to identify assets and barriers to the organ donation and patient referral processes; assess hospital–OPO relationships and offer tailored recommendations for improving these processes. Having partnered with seven OPOs, data were collected at 70 hospitals with high donor potential in the form of direct observations and interviews with 2358 HCPs. We found that donation attitudes and knowledge among HCPs were high, but use of standard referral criteria was lacking. Significant differences were found in the donation-related attitudes, knowledge and behaviors of physicians and emergency department staff as compared to other staff in intensive care units with high organ donor potential. Also, while OPO staff were generally viewed positively, they were often perceived as outsiders rather than members of healthcare teams. Recommendations for improving the referral and donation processes are discussed. PMID:22900761

  10. In-service inspection and periodic testing

    International Nuclear Information System (INIS)

    Eisele, H.; Meyer, F.A.; Zipser, R.R.

    1981-01-01

    In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. Below, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor/PWR/ or on a boiling-water reactor/BWR/) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  11. In-service inspection and periodic testing

    International Nuclear Information System (INIS)

    Eisele, H.; Meyer, F.A.; Zipser, R.R.

    1980-01-01

    In-service inspections are performed to verify the operational safety, and maintenance work is performed to guarantee the availability. In the present paper, the typical in-service inspections of a light-water reactor NPP (operated on a pressurized-water reactor/PWR/ or on a boiling-water reactor/BWR/) are described with details and examples of typical inspections, especially of recurrent performance tests of the systems. (orig./RW)

  12. Public Procurement of Innovation in Sweden

    DEFF Research Database (Denmark)

    Rolfstam, Max; Ågren, Robert

    2014-01-01

    Sweden is often thought of as a country with a strong tradition for using public procurement as a means to stimulate innovation. Early on, Sweden recognized and developed procedures for using public procurement as a technologydevelopment tool. After a period where emphasis was put on this aspect ...... government authorities to engage in public procurement for innovation, and by issuing guidance on the topic.......Sweden is often thought of as a country with a strong tradition for using public procurement as a means to stimulate innovation. Early on, Sweden recognized and developed procedures for using public procurement as a technologydevelopment tool. After a period where emphasis was put on this aspect...... of public procurement Sweden dropped many policy initiatives within this field. This was in part due to neo-liberal movements during the 1980s which in interaction with a distributed institutional setup led to the removal of incentives for a procuring authority to engage in public procurement of innovation...

  13. Sustainable Procurement

    DEFF Research Database (Denmark)

    Telles, Pedro; Ølykke, Grith Skovgaard

    2017-01-01

    and within it how sustainable requirements have increased the level of compliance required, particularly regulatory compliance. Compliance was already present in previous EU public procurement frameworks, but its extent on Directive 2014/24/EU leads the authors to consider the current legal framework...

  14. Reliability analysis of structures under periodic proof tests in service

    Science.gov (United States)

    Yang, J.-N.

    1976-01-01

    A reliability analysis of structures subjected to random service loads and periodic proof tests treats gust loads and maneuver loads as random processes. Crack initiation, crack propagation, and strength degradation are treated as the fatigue process. The time to fatigue crack initiation and ultimate strength are random variables. Residual strength decreases during crack propagation, so that failure rate increases with time. When a structure fails under periodic proof testing, a new structure is built and proof-tested. The probability of structural failure in service is derived from treatment of all the random variables, strength degradations, service loads, proof tests, and the renewal of failed structures. Some numerical examples are worked out.

  15. Systematization of Angra-1 operation attendance - Maintenance and periodic testings

    International Nuclear Information System (INIS)

    Furieri, E.B.; Carvalho Bruno, N. de; Salaverry, N.A.

    1988-01-01

    A maintenance analysis, their types and their functions for the safety of nuclear power plants is done. Programs and present trends in the reactor maintenance, as well as the maintenance program and periodic tests of Angra I, are analysed. The necessities of safety analysis and a systematization for maintenance attendance are discussed and the periodic testing as well as the attendance of international experience. (M.C.K.) [pt

  16. ANOVA Analysis of Student Daily Test Scores in Multi-Day Test Periods

    Science.gov (United States)

    Mouritsen, Matthew L.; Davis, Jefferson T.; Jones, Steven C.

    2016-01-01

    Instructors are often concerned when giving multiple-day tests because students taking the test later in the exam period may have an advantage over students taking the test early in the exam period due to information leakage. However, exam scores seemed to decline as students took the same test later in a multi-day exam period (Mouritsen and…

  17. Periodic Hydraulic Testing for Discerning Fracture Network Connections

    Science.gov (United States)

    Becker, M.; Le Borgne, T.; Bour, O.; Guihéneuf, N.; Cole, M.

    2015-12-01

    Discrete fracture network (DFN) models often predict highly variable hydraulic connections between injection and pumping wells used for enhanced oil recovery, geothermal energy extraction, and groundwater remediation. Such connections can be difficult to verify in fractured rock systems because standard pumping or pulse interference tests interrogate too large a volume to pinpoint specific connections. Three field examples are presented in which periodic hydraulic tests were used to obtain information about hydraulic connectivity in fractured bedrock. The first site, a sandstone in New York State, involves only a single fracture at a scale of about 10 m. The second site, a granite in Brittany, France, involves a fracture network at about the same scale. The third site, a granite/schist in the U.S. State of New Hampshire, involves a complex network at scale of 30-60 m. In each case periodic testing provided an enhanced view of hydraulic connectivity over previous constant rate tests. Periodic testing is particularly adept at measuring hydraulic diffusivity, which is a more effective parameter than permeability for identify the complexity of flow pathways between measurement locations. Periodic tests were also conducted at multiple frequencies which provides a range in the radius of hydraulic penetration away from the oscillating well. By varying the radius of penetration, we attempt to interrogate the structure of the fracture network. Periodic tests, therefore, may be uniquely suited for verifying and/or calibrating DFN models.

  18. Estimation of common cause failure parameters with periodic tests

    Energy Technology Data Exchange (ETDEWEB)

    Barros, Anne [Institut Charles Delaunay - Universite de technologie de Troyes - FRE CNRS 2848, 12, rue Marie Curie - BP 2060 -10010 Troyes cedex (France)], E-mail: anne.barros@utt.fr; Grall, Antoine [Institut Charles Delaunay - Universite de technologie de Troyes - FRE CNRS 2848, 12, rue Marie Curie - BP 2060 -10010 Troyes cedex (France); Vasseur, Dominique [Electricite de France, EDF R and D - Industrial Risk Management Department 1, av. du General de Gaulle- 92141 Clamart (France)

    2009-04-15

    In the specific case of safety systems, CCF parameters estimators for standby components depend on the periodic test schemes. Classically, the testing schemes are either staggered (alternation of tests on redundant components) or non-staggered (all components are tested at the same time). In reality, periodic tests schemes performed on safety components are more complex and combine staggered tests, when the plant is in operation, to non-staggered tests during maintenance and refueling outage periods of the installation. Moreover, the CCF parameters estimators described in the US literature are derived in a consistent way with US Technical Specifications constraints that do not apply on the French Nuclear Power Plants for staggered tests on standby components. Given these issues, the evaluation of CCF parameters from the operating feedback data available within EDF implies the development of methodologies that integrate the testing schemes specificities. This paper aims to formally propose a solution for the estimation of CCF parameters given two distinct difficulties respectively related to a mixed testing scheme and to the consistency with EDF's specific practices inducing systematic non-simultaneity of the observed failures in a staggered testing scheme.

  19. Procurement engineering - the productivity factor

    Energy Technology Data Exchange (ETDEWEB)

    Bargerstock, S.B. (TENERA, L.P., Chattanooga, TN (United States))

    1993-01-01

    The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment. Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station.

  20. Procurement engineering - the productivity factor

    International Nuclear Information System (INIS)

    Bargerstock, S.B.

    1993-01-01

    The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O ampersand M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment. Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O ampersand M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station

  1. Periodic tests: a human factors analysis of documentary aspects

    International Nuclear Information System (INIS)

    Perinet, Romuald; Rousseau, Jean-Marie

    2007-01-01

    Periodic tests are technical inspections aimed at verifying the availability of the safety-related systems during operation. The French licensee, Electricite de France (EDF), manages periodic tests according to procedures, methods of examination and a frequency, which were defined when the systems were designed. These requirements are defined by national authorities of EDF in a reference document composed of rules of testing and tables containing the reference values to be respected. This reference document is analyzed and transformed by each 'Centre Nucleaire de Production d'Electricite' (CNPE) into station-specific operating ranges of periodic tests. In 2003, the IRSN noted that significant events for safety (ESS) involving periodic tests represented more than 20% of ESS between 2000 and 2002. Thus, 340 ESS were related to non-compliance with the conditions of the test and errors in the implementation of the procedures. A first analysis showed that almost 26% of all ESSs from 2000 to 2002 were related to periodic tests. For many of them, the national reference document and the operating ranges of tests were involved. In this context, the 'Direction Generale de la Surete Nucleaire' (DGSNR), requested the 'Institut de Radioprotection et de Surete Nucleaire' (IRSN) to examine the process of definition and implementation of the periodic tests. The IRSN analyzed about thirty French Licensee event reports occurring during the considered period (2000-2002). The IRSN also interviewed the main persons responsible for the processes and observed the performance of 3 periodic tests. The results of this analysis were presented to a group of experts ('Groupe Permanent') charged with delivering advice to the DGSNR about the origin of the problems identified and the improvements to be implemented. The main conclusions of the IRSN addressed the quality of the prescriptive documents. In this context, EDF decided to carry out a thorough analysis of the whole process. The first

  2. Reliability performance of standby equipment with periodic testing

    International Nuclear Information System (INIS)

    Sim, S.H.

    1985-11-01

    In this report, the reliability performance of standby equipment subjected to periodic testing is studied. analytical expressions have been derived for reliability measures, such as the man accumulated operating time to failure, the expected number of tests between two consecutive failures, the mean time to failure following an emergency start-up and the probability of failing to complete an emergency mission of a specified duration. These results are useful for the reliability assessment of standby equipment such as combustion turbine units of the emergency power supply system, and of the Class III power system at a nuclear generating station

  3. Significance of acceleration period in a dynamic strength testing study.

    Science.gov (United States)

    Chen, W L; Su, F C; Chou, Y L

    1994-06-01

    The acceleration period that occurs during isokinetic tests may provide valuable information regarding neuromuscular readiness to produce maximal contraction. The purpose of this study was to collect the normative data of acceleration time during isokinetic knee testing, to calculate the acceleration work (Wacc), and to determine the errors (ERexp, ERwork, ERpower) due to ignoring Wacc during explosiveness, total work, and average power measurements. Seven male and 13 female subjects attended the test by using the Cybex 325 system and electronic stroboscope machine for 10 testing speeds (30-300 degrees/sec). A three-way ANOVA was used to assess gender, direction, and speed factors on acceleration time, Wacc, and errors. The results indicated that acceleration time was significantly affected by speed and direction; Wacc and ERexp by speed, direction, and gender; and ERwork and ERpower by speed and gender. The errors appeared to increase when testing the female subjects, during the knee flexion test, or when speed increased. To increase validity in clinical testing, it is important to consider the acceleration phase effect, especially in higher velocity isokinetic testing or for weaker muscle groups.

  4. Procurement Tracking System (PTS)

    Data.gov (United States)

    Office of Personnel Management — The Procurement Tracking System (PTS) is used solely by the procurement staff of the Office of the Inspector General (OIG) at the U.S. Office of Personnel Management...

  5. Discriminatory public procurement policies

    NARCIS (Netherlands)

    Ssennoga, Francis

    2010-01-01

    To achieve social economic objectives, governments usually institute discriminatory practices in their country’s public procurement framework. Discriminatory procurement is the practice by governments to favour their own domestic suppliers over foreign firms for advertised contracts. Favouring

  6. Public procurement process

    African Journals Online (AJOL)

    NESG Policy Brief: April 2017. Public ... transparency in public procurement; and greater concerns about efficiency, fairness, and equity. ... government enacted the Public Procurement Act (2007) [1] which provides legislative framework for.

  7. Procurement Career Management Handbook.

    Science.gov (United States)

    Department of the Treasury, Washington, DC.

    This handbook is the result of the Treasury Department's efforts to increase professionalism among its procurement employees nationwide through its Procurement Career Management Program. First, the scope and objectives of the Procurement Career Management Program are discussed. The remaining sections of the handbook deal with the following program…

  8. Indonesia - Procurement Modernization

    Data.gov (United States)

    Millennium Challenge Corporation — The evaluation seeks to establish evidence on the possible effects of an intervention designed to modernize public procurement: effects on cost savings, performance...

  9. Public Procurement and Innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    be understood as a special case of innovation, where social processes – and consequently the institutions governing these social processes – need to be considered. This book contributes to our understanding with a detailed institutional analysis of the public procurement of innovation.......Max Rolfstam examines the increasing emphasis on public procurement as a means to stimulate innovation and the theoretical implications of this policy development. While ‘regular’ public procurement may be regarded as the outcome of anonymous market processes, public procurement of innovation must...

  10. Organ procurement: Spanish transplant procurement management.

    Science.gov (United States)

    Manyalich, Martí; Mestres, Carlos A; Ballesté, Chloë; Páez, Gloria; Valero, Ricard; Gómez, María Paula

    2011-06-01

    Transplantation is an accepted therapeutic option to save or improve the quality of life when organ failure occurs or tissue replacements are needed. However, the lack of organs is the major limitation. The deceased organ procurement organization and professionals provide the solution to this international problem. In this review, we identify the elements involved in the organ procurement management process to analyze the possibility of implementation of deceased organ procurement for a transplantation program. While the donation rates are subject to several negative factors including religious, economic, cultural, and legal issues, the existence of well-trained professionals may considerably increase them. Professional training in organ donation along with the establishment of a solid organizational system has been identified as the crucial factor in developing efficient organ donation and transplantation programs.

  11. Procurement with Specialized Firms

    NARCIS (Netherlands)

    Boone, J.; Schottmuller, C.

    2011-01-01

    This paper analyzes optimal procurement mechanisms in a setting where the procurement agency has incomplete information concerning the firms’ cost functions and cares about quality as well as price. Low type firms are cheaper than high type firms in providing low quality but more expensive when

  12. Procurement with specialized firms

    NARCIS (Netherlands)

    Boone, Jan; Schottmuller, C.

    2016-01-01

    We analyze optimal procurement mechanisms when firms are specialized. The procurement agency has incomplete information concerning the firms' cost functions and values high quality as well as low price. Lower type firms are cheaper (more expensive) than higher type firms when providing low (high)

  13. Evolving Procurement Organizations

    DEFF Research Database (Denmark)

    Bals, Lydia; Laiho, Aki; Laine, Jari

    Procurement has to find further levers and advance its contribution to corporate goals continuously. This places pressure on its organization in order to facilitate its performance. Therefore, Procurement organizations constantly have to evolve in order to match these demands. A conceptual model...... is presented and results of a first case study discussed. The findings highlight the importance of taking a contingency perspective on Procurement organization, understanding the internal and internal contingency factors. From a theoretical perspective, it opens up insights that can be furthermore leveraged...... in future studies in the fields of hybrid procurement organizations, global sourcing organizations as well as international procurement offices (IPOs). From a practical standpoint, an assessment of external and internal contingencies provides the opportunity to consciously match organization to its...

  14. Safety enhancement of composites via periodic proof testing

    OpenAIRE

    Woodward, Joseph H.

    1993-01-01

    Approved for public release; distribution is unlimited. The development of new composite materials, which lack the historical field data base, has led to the need for an accelerated life testing method applicable to composites. Accelerated life testing by increasing the sustained stress levels requires the modeling and validation of a strength-life relation. Proof testing of composite fibers by over-loading is one step in the understanding of the relationship. It is also important in the r...

  15. A Bayesian test for periodic signals in red noise

    Science.gov (United States)

    Vaughan, S.

    2010-02-01

    Many astrophysical sources, especially compact accreting sources, show strong, random brightness fluctuations with broad power spectra in addition to periodic or quasi-periodic oscillations (QPOs) that have narrower spectra. The random nature of the dominant source of variance greatly complicates the process of searching for possible weak periodic signals. We have addressed this problem using the tools of Bayesian statistics; in particular, using Markov Chain Monte Carlo techniques to approximate the posterior distribution of model parameters, and posterior predictive model checking to assess model fits and search for periodogram outliers that may represent periodic signals. The methods developed are applied to two example data sets, both long XMM-Newton observations of highly variable Seyfert 1 galaxies: RE J1034 + 396 and Mrk 766. In both cases, a bend (or break) in the power spectrum is evident. In the case of RE J1034 + 396, the previously reported QPO is found but with somewhat weaker statistical significance than reported in previous analyses. The difference is due partly to the improved continuum modelling, better treatment of nuisance parameters and partly to different data selection methods.

  16. Conflicts in Public Procurement

    Directory of Open Access Journals (Sweden)

    Helena Lindskog

    2013-01-01

    Full Text Available During the last couple of years, there has been a tendency to include more and more political goals into public procurements, such as environmental and societal considerations. This can result in higher prices paid by the public sector compared with similar procurements in the private sector. The decision makers at local level are elected and should represent the interest of their communities and voters, which includes promoting regional/local companies and economic development. This task can sometimes get into conflict with public procurement law or the political goals of a central government. (original abstract

  17. Brexit and government procurement

    OpenAIRE

    Dawar, Kamala

    2017-01-01

    This briefing paper looks at some of the legal issues that will affect the UK’s public procurement laws and policies following Brexit. For, once the UK revokes the European Communities Act 1972, it will no longer be obligated to follow the EU Procurement Directives, nor will it be subject to the commitments the EU has signed up to on behalf of the UK in the WTO Government Procurement Agreement (GPA) and in Preferential Trade Agreements (PTAs). Additionally, under the Devolution Settlement of ...

  18. Towards the procurement of the ITER divertor

    International Nuclear Information System (INIS)

    Merola, M.; Tivey, R.; Martin, A.; Pick, M.

    2006-01-01

    The procurement of the ITER divertor is planned to start in 2009. On the basis of the present common understanding of the sharing of the ITER components, the Japanese Participating Team (JAPT) will supply the outer vertical target, the Russian Federation (RF) PT the dome liner and will perform the high heat flux testing, the EU PT will supply the inner vertical targets and the cassette bodies, including final assembly of the divertor plasma-facing components (PFCs). The manufacturing of the PFCs of the ITER divertor represents a challenging endeavor due to the high technologies which are involved, and due to the unprecedented series production. To mitigate the associated risks, special arrangements need to be put in place prior to and during procurement to ensure quality and to keep to the time schedule. Before procurement can start, an ITER review of the qualification and production capability of each candidate PT is planned. Well in advance of the assumed start of the procurement, each PT which would like to contribute to the divertor PFC procurement, should first demonstrate its technical qualification to carry out the procurement with the required quality, and in an efficient and timely manner. Appropriate precautions, like subdivision of the procurement into stages, are also to be adopted during the procurement phase to mitigate the consequences of possible unexpected manufacturing problems. In preparation for writing the procurement specification for the vertical targets, the topic of setting acceptance criteria is also being addressed. This activity has the objective of defining workable acceptance criteria for the PFC armour joints. A complete set of analyses is also in progress to assess the latest design modifications against the design requirements. This task includes neutronic, shielding, thermo-mechanical and electromagnetic analyses. More than half of the ITER plasma parameters that must be measured and the related diagnostics are located in the

  19. 49 CFR 229.25 - Tests: Every periodic inspection.

    Science.gov (United States)

    2010-10-01

    ... mechanical gauges used by the engineer to aid in the control or braking of the train or locomotive, except... follows: (1) All automatic controls, alarms and protective devices shall be inspected and tested. (2...

  20. 77 FR 67239 - National Organic Program; Periodic Residue Testing

    Science.gov (United States)

    2012-11-09

    ... genetically modified organisms (GMOs). AMS does not intend for the testing conducted under section 205.670 to..., but not limited to, pesticides, hormones, antibiotics, and GMOs. AMS notes that, under section 205.671...

  1. Ukraine : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2001-01-01

    The main objectives of the country procurement assessment are to diagnose the public procurement system in Ukraine, assess compatibility of the country's laws, policies and procedures with international best practices, review compliance with the procurement laws and regulations and identify areas for improvement of the procurement system in Ukraine. With due recognition of the considerable...

  2. Croatia : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2005-01-01

    Based on the CPAR's analysis of the legislative framework, procurement practices, institutional capacity and the opportunity for corruption, the assessment found that the environment for conducting public procurement in Croatia is average. This report makes a series of recommendations designed to strengthen the public procurement environment of Croatia, including legislative reform, improving procurement procedures and practices, institutional reform, capacity building, and the development of...

  3. Fighting corruption in tactical procurement

    NARCIS (Netherlands)

    Obanda Wanyama, Peter

    2010-01-01

    Vast amount of public resources are spent on procurement. Effective public procurement yields additional budget space, hence it ought to be conducted with due diligence. However, public procurement most especially tactical procurement in local governments in Uganda is vulnerable to corruption. In

  4. Evolving Procurement Organizations

    DEFF Research Database (Denmark)

    Bals, Lydia; Laine, Jari; Mugurusi, Godfrey

    Procurement has to find further levers and advance its contribution to corporate goals continuously. This places pressure on its organization in order to facilitate its performance. Therefore, procurement organizations constantly have to evolve in order to match these demands. A conceptual model...... and external contingency factors and having a more detailed look at the structural dimensions chosen, beyond the well-known characteristics of centralization, formalization, participation, specialization, standardization and size. From a theoretical perspective, it opens up insights that can be leveraged...

  5. Sustainable Bridge Infrastructure Procurement

    DEFF Research Database (Denmark)

    Safi, Mohammed; Du, Guangli; Simonsson, Peter

    2016-01-01

    The lack of a flexible but systematic approach for integrating lifecycle aspects into bridge investment decisions is a major obstacle hindering the procurement of sustainable bridge infrastructures. This paper addresses this obstacle by introducing a holistic approach that agencies could use...... to procure the most “sustainable” (lifecycle-efficient) bridge through a fair design-build (D-B) tendering process, considering all the main aspects: life-cycle cost (LCC), service life-span, aesthetic demands and environmental impacts (LCA)....

  6. Drug procurement and management.

    Science.gov (United States)

    Salhotra, V S

    2003-03-01

    A strong drug procurement and management system under the RNTCP is critical to programme success. Significant improvements in manufacturing, inspection, supply, storage and quality control practices and procedures have been achieved due to an intensive RNTCP network. Drugs used in RNTCP are rifampicin, isoniazid, ethambutol, pyrazinamide and streptomycin. Patients of TB are categorised into I, II and III and each category has a different standarised treatment. Procurement, distribution system and quality assurance of drugs are narrated in brief in this article.

  7. Small Business Procurement Event

    Science.gov (United States)

    2014-08-13

    Small Business Procurement Event 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Department of the Navy,Office of Small Business Programs,720 Kennon...distribution unlimited 13. SUPPLEMENTARY NOTES NDIA 27th Navy Gold Coast Small Business Procurement Event, 12-13 Aug 2014, San Diego, CA. 14. ABSTRACT

  8. 76 FR 23914 - National Organic Program; Periodic Residue Testing

    Science.gov (United States)

    2011-04-29

    ... NOP. Residue testing plays an important role in organic certification by providing a means for... OFPA (7 U.S.C. 6503 through 6507) from creating certification programs to certify organic farms or... State organic certification program may contain additional requirements for the production and handling...

  9. Fighting corruption in tactical procurement

    OpenAIRE

    Obanda Wanyama, Peter

    2010-01-01

    Vast amount of public resources are spent on procurement. Effective public procurement yields additional budget space, hence it ought to be conducted with due diligence. However, public procurement most especially tactical procurement in local governments in Uganda is vulnerable to corruption. In this thesis we analyze how tactical procurement can be managed to fight corruption and promote integrity in the decentralized context in local governments in Uganda. Specifically, we identify the mos...

  10. Biodosimetric test in routine practice of periodic views

    International Nuclear Information System (INIS)

    Rakic, B.; Jovcic, D.; Pavlovic, M.; Milacic, S.; Kovacevic, R.; Rakic, B.)

    2007-01-01

    Biodosimetry is the most sensitive method for measuring the ionizing radiation exposition level. This method enables determination of absolute dose of radiation to which the person has been exposed by defining the frequency of appearance of unstable chromosome aberrations in lymphocytes of the peripheral blood. The aim of this work was to detect the chromosome aberrations in persons which have been occupationally exposed to low doses of ionizing radiation, as well as to compare their frequencies among sexes. Among 86 patients tested by biodosimetric test, 43 women and 43 men, the presence of 74 unstable chromosome aberrations of dicentric type (12.2%), ring chromosome (2.7%) and acentric fragments (85.1%) were detected. This result indicates that there was no overexposing of any of those patients to the radiation, i.e. that there was no elevated dose absorption. Furthermore, Pearson Chi-square test showed that there is no difference in frequencies of unstable aberrations between males and females (for all detected aberrations the statistical confidence was P>0.05). The extreme contribution to further investigations would be the introduction of molecular genetics methods, such as PCR and FISH, with aim to detect the more 'subtle' damages of DNA of patients occupationally exposed to ionizing radiation [sr

  11. The procurement and testing of the stainless steel in-vessel panels of the Wendelstein 7-X Stellarator

    Energy Technology Data Exchange (ETDEWEB)

    Peacock, A., E-mail: alan.peacock@ipp.mpg.de [European Commission c/o Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, 85748 Garching (Germany); Girlinger, A. [MAN Diesel and Turbo SE D-94469 Deggendorf (Germany); Vorkoeper, A. [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, 17491 Greifswald (Germany); Boscary, J.; Greuner, H. [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, 85748 Garching (Germany); Hurd, F. [European Commission c/o Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, 85748 Garching (Germany); Mendelevitch, B.; Pirsch, H.; Stadler, R.; Zangl, G. [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, 85748 Garching (Germany)

    2011-10-15

    320 In-vessel water cooled stainless steel panels, poloidal closure plates and pumping gap panels, covering an area of approximately 100 m{sup 2}, are used in Wendelstein7-X to protect the plasma vessel. The panels are manufactured at Deggendorf, Germany by MAN Diesel and Turbo SE. The panels consist of a laser welded sandwich of stainless steel plates together with a labyrinth of cooling channels and have a complicated geometry to fit the plasma vessel of Wendelstein 7-X. The hydraulic and mechanical stability requirements whilst maintaining the tight tolerances for the shape of the components are very demanding. The panels are designed to operate at up to an average heat load of 100 kW/m{sup 2} and a maximum heat load of 200 kW/m{sup 2} with a water velocity of approximately 2 m s{sup -1}. High heat flux testing of an un-cooled panel at a time averaged load of 200 kW/m{sup 2} for 10 s were successfully performed to support the start up phase of Wendelstein 7-X operation. Extensive testing both during manufacture and after delivery to IPP-Garching demonstrates the suitability of the delivered panels for their purpose.

  12. The procurement and testing of the stainless steel in-vessel panels of the Wendelstein 7-X Stellarator

    International Nuclear Information System (INIS)

    Peacock, A.; Girlinger, A.; Vorkoeper, A.; Boscary, J.; Greuner, H.; Hurd, F.; Mendelevitch, B.; Pirsch, H.; Stadler, R.; Zangl, G.

    2011-01-01

    320 In-vessel water cooled stainless steel panels, poloidal closure plates and pumping gap panels, covering an area of approximately 100 m 2 , are used in Wendelstein7-X to protect the plasma vessel. The panels are manufactured at Deggendorf, Germany by MAN Diesel and Turbo SE. The panels consist of a laser welded sandwich of stainless steel plates together with a labyrinth of cooling channels and have a complicated geometry to fit the plasma vessel of Wendelstein 7-X. The hydraulic and mechanical stability requirements whilst maintaining the tight tolerances for the shape of the components are very demanding. The panels are designed to operate at up to an average heat load of 100 kW/m 2 and a maximum heat load of 200 kW/m 2 with a water velocity of approximately 2 m s -1 . High heat flux testing of an un-cooled panel at a time averaged load of 200 kW/m 2 for 10 s were successfully performed to support the start up phase of Wendelstein 7-X operation. Extensive testing both during manufacture and after delivery to IPP-Garching demonstrates the suitability of the delivered panels for their purpose.

  13. Critical factors for sustainable food procurement in zoological collections.

    Science.gov (United States)

    Hanson, Jonathan H

    2015-01-01

    Food procurement can play an important role in sustainable food supply chain management by zoos, linking organizational operations to the biodiversity conservation and sustainability mission of zoological collections. This study therefore examines the critical factors that shape sustainable food procurement in zoo and aquariums. Using a web-based survey data was collected from 41 members of the British and Irish Association of Zoos and Aquariums (BIAZA). This included information on the sustainable food procurement practices of these institutions for both their human and animal food supply chains, as well as profile information and data on the factors contributing to and inhibiting sustainable procurement practices. Zoological collections operated by charities, and those with a certified sustainability standard, were found to have significantly higher levels of sustainable food procurement. Zoos and aquariums whose human food operations were not contracted to an external party were also found to have significantly higher levels of sustainable food procurement in their human food supply chain. The most important drivers of sustainable food procurement were cost savings, adequate financial support and improved product quality. The highest ranking barriers were higher costs, other issues taking priority and a lack of alternative suppliers. The results suggest that a number of critical factors shape sustainable food procurement in zoological collections in the British Isles. Financial factors, such as cost savings, were important considerations. The significance of mission-related factors, such as charity status, indicated that core values held by zoos and aquariums can also influence their food procurement practices. © 2015 Wiley Periodicals, Inc.

  14. Revision of nuclear power plants safety systems' routine testing assigned periodicity during the design extension period

    International Nuclear Information System (INIS)

    Skalozubov, V.I.; Kozlov, Yi.L.; Chulkyin, O.O.

    2017-01-01

    When nuclear power plants safety systems thermal equipment operation extending, a necessary requirement shall rely on revising the scheduled equipment tests frequency to optimize those tests schedule taking into account the equipment remained lifespan. On the one hand, there exists a need for tests frequency increase to detect ''hidden'' failures, and on the another, frequent tests cause a premature wear of the equipment. Proposed is an original method for optimizing the frequency of NPPs safety systems thermal engineering equipment testing. Essential in the proposed method is the optimization criterion chosen: index of security system failure probability non-exceedance during the beyond-design operating period as referred to the failure probability expected considering the equipment residual resource during the design operating period. The developed method implementation when applied to NPPs safety systems operated beyond the design service life at nuclear power plants with WWER-1000 series reactors, allowed to establish that the optimal tests frequency makes half the designed one when the equipment service life is extended by five years and three times less that the designed frequency when subject lifespan extended by 10 years.

  15. Data feature: Fuel procurement

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This document is a review of the effect of fuel costs on the procurement strategies of a utility and a conjecture that the same strategies may have an effect on the price of fuel. Factors affecting fuel costs are reviewed, and a number of procurement strategies taken to trim fuel costs are reviewed. The major trend is away from long-term enrichment contracts and into such strategies as: (1) Spot market purchases, (2) Inventory reduction, (3) Purchase of CIS material, and (4) Market-related contracts instead of base-escalated contracts

  16. Indonesia - Country Procurement Assessment Report : Reforming the Public Procurement System

    OpenAIRE

    World Bank

    2001-01-01

    The main objectives of the Country Procurement Assessment Review (CPAR) are to diagnose the public procurement system in Indonesia, assess actual compliance with the country's procurement laws and regulations on the ground, and identify reforms to improve the existing system in line with internationally accepted principles. Section 1 gives an overview. Section 2 describes Indonesia's exist...

  17. CORRELATES OF PROCUREMENT PERFORMANCE OF ...

    African Journals Online (AJOL)

    Osondu

    2013-02-22

    Feb 22, 2013 ... Purpose of this study is to investigate if procurement challenges, contractual procedures, designer's experience ... Design and Build, Project Management, Direct. Labour and ..... Government Procurement Performance in.

  18. Slovakia : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2001-01-01

    This update of the 1995 CPAR is based on the September 1999 PPA and the findings of the Bank CPAR mission to Slovakia in November 1999. The 1999 Public Procurement Act (PPA) is an improvement upon the previous PPAs in some respects, including the creation of an OPP, more detailed and clear procurement procedures, accreditation of procurement professionals, introduction of the Public Procu...

  19. Tanzania : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2003-01-01

    This Country Procurement Assessment Report (CPAR)intends to determine the compatibility of national procurement law, and practices, with the principles of economy, and with international procurement practices. This CPAR, the second of its kind in Tanzania, looks at the legislative framework, the performance of regulatory functions, the enforcement regime, and the capacity of public sector ...

  20. OAS :: Accountability :: Procurement

    Science.gov (United States)

    OAS, including its organizational structure, each organizational unit's staffing, vacant posts, and a list of procurement notices for formal bids, links to the performance contract and travel control Performance Contract reports from January 2013 to June 2017 may be found.) Travel Information and Control

  1. Procurement Sustainable Building Practice

    NARCIS (Netherlands)

    Schmid, P.

    1998-01-01

    Two aspects will be stressed in the frame of this topic: The Procurement Aspects and the Aspects of Conflict and Dispute Resolution. The Right for Environment - to introduce the following aspects - is not only the consequence of care-taking for Nature as an admirable phenomenon, but also as a source

  2. Public Procurement of Innovation Policy

    DEFF Research Database (Denmark)

    Rolfstam, Max; Petersen, Ole Helby

    2014-01-01

    Until recently, Danish policy interest in public procurement has mainly been driven by efficiency and cost-effectiveness concerns. Public-procurement policies have in general focused on the utilisation of economies of scale as a Means of achieving lower prices on goods and services. Attempts...... to develop mandatory procurement systems have also been gradually developing, while the focus on innovation has been relatively modest in Danish procurement policies until recently. This picture is currently changing, as several initiatives emphasising public procurement as a means of stimulating innovation...... have been launched. Whether this gradual change of focus in Danish procurement policies will make a deep and lasting impact on the role of public procurement as a driver for innovationis, however, yet an open question....

  3. PROCUREMENT AND CONTRACT MANAGEMENT

    CERN Multimedia

    Training & Development Group; Linda Orr-Easo; Tel. 72460; Nathalie Dumeaux; Tel. 78144

    2001-01-01

    We are pleased to announce the launch of a new training on: Procurement and Contract Management (This seminar will be run by CERN experts in French or in English) Level 1 The aim is to raise awareness of the key issues involved. Date : 8 June 2001 This level is open to everyone. Participants should register via our Web page as soon as possible. Level 2 To develop the skills needed to effectively manage contracts, from the Technical, Commercial and Legal aspects. Dates : Three days, Autumn 2001 This Level is open to those who are/will be more directly responsible for procurement and contract management. Participants should have followed Level 1. For a description of the seminar, please consult:   Level 1: http://training.web.cern.ch/Training/MANCO/P9798/9-cm_e.htm Level 2: http://training.web.cern.ch/Training/MANCO/P9798/9-cm2_e.htm

  4. Price competition in procurement

    International Nuclear Information System (INIS)

    Keisler, J.M.; Buehring, W.A.

    1996-07-01

    When creating a private market to provide a public good, government agencies can influence the market's competitive characteristics. Markets have predictable, but often counterintuitive, behaviors. To succeed in applying available controls, and thereby reduce future costs, agencies must understand the behavior of the market. A model has been constructed to examine some issues in establishing competition for a structure in which there are economies of scale and government is obligated to purchase a fixed total quantity of a good. This model is used to demonstrate a way to estimate the cost savings from several alternative plans for a buyer exploring competitive procurement. The results are not and cannot be accurate for budgeting purposes; rather, they indicate the approximate magnitude of changes in cost that would be associated with changes in the market structure within which procurement occurs

  5. Defense Primer: Procurement

    Science.gov (United States)

    2017-02-10

    Usually, incremental funding is used to mitigate peaks and valleys in annual budgets caused by the cost of one item significantly changing the...base defense budget . DOD uses these funds to buy several different types of materiel, including  new items easily recognizable as military...pursues a policy of full funding for procurement, meaning that the total estimated cost of each unit must be funded in the year it is budgeted . In a

  6. Designing flexible procurement systems

    OpenAIRE

    Hughes, Will

    1990-01-01

    The systems used for the procurement of buildings are organizational systems. They involve people in a series of strategic decisions, and a pattern of roles, responsibilities and relationships that combine to form the organizational structure of the project. To ensure effectiveness of the building team, this organizational structure needs to be contingent upon the environment within which the construction project takes place. In addition, a changing environment means that the organizational s...

  7. Procurement and participation opportunities

    International Nuclear Information System (INIS)

    Lovatt, D.

    1998-01-01

    The elements which drive the Sable Offshore Energy Project and its procurement processes were described. The project is privately financed, hence business practices must adhere to strict principles to be able to compete with alternative energy sources and to ensure success for all stakeholders including owners, contractors, suppliers and the business community. One of the objectives of the project is to adhere to the requirements of applicable legislation and not to compromise health, safety and environmental standards. To ensure this compliance by all concerned, the regulatory requirements are embedded in the contracting and procurement procedures. Details of the procurement cycle are described. A list of some of the successes that Nova Scotian companies have had in getting work on the project was provided as an illustration of the ingenuity and foresight of these companies to develop appropriate quality assurance and health, safety and environmental procedures, and to bring in the needed capacity and technology through the formation of joint ventures and alliances. The list of contracts represents more than 100 million dollars worth of work to date. 3 figs

  8. Prophylactic procurement of university students in Southern Ethiopia: stigma and the value of condom machines on campus.

    Science.gov (United States)

    Wells, Christopher J; Alano, Abraham

    2013-01-01

    Risky sexual behavior among Ethiopian university students, especially females, is a major contributor to young adult morbidity and mortality. Ambaw et al. found that female university students in Ethiopia may fear the humiliation associated with procuring condoms. A study in Thailand suggests condom machines may provide comfortable condom procurement, but the relevance to a high-risk African context is unknown. The objective of this study was to examine if the installation of condom machines in Ethiopia predicts changes in student condom uptake and use, as well as changes in procurement related stigma. Students at a large urban university in Southern Ethiopia completed self reported surveys in 2010 (N  = 2,155 surveys) and again in 2011 (N =  2,000), six months after the installation of condom machines. Mann-Whitney and Chi-square tests were conducted to evaluate significant changes in student sexual behavior, as well as condom procurement and associated stigma over the subsequent one year period. After installing condom machines, the average number of trips made to procure condoms on-campus significantly increased 101% for sexually active females and significantly decreased 36% for sexually active males. Additionally, reports of condom use during last sexual intercourse showed a non-significant 4.3% increase for females and a significant 9.0% increase for males. During this time, comfort procuring condoms and ability to convince sexual partners to use condoms were significantly higher for sexually active male students. There was no evidence that the condom machines led to an increase in promiscuity. The results suggest that condom machines may be associated with more condom procurement among vulnerable female students in Ethiopia and could be an important component of a comprehensive university health policy.

  9. Multicriteria analysis in public procurement

    Directory of Open Access Journals (Sweden)

    Dejan T. Tošev

    2012-07-01

    Full Text Available The public procurement is one of the most important processes in modern company daily business. The quality of that process and its realization affect the overall company success and reputation. For that purpose, the management is obliged to prepare and carry out the procurement process carefully. The process is based on multicriteria tendering and the purpose of this paper is to present the analytical and hierarchical procurement methods in order to minimize failing in the selection and decision making process.

  10. A powerful test for weak periodic signals with unknown light curve shape in sparse data

    International Nuclear Information System (INIS)

    Jager De, O.C.; Raubenheimer, B.C.; Swanepoel, J.W.H.

    1989-01-01

    A problem with most tests for periodicity is that they are powerful enough to detect only certain kinds of periodic shapes in the case of weak signals. This causes a selection effect with the identification of weak periodic signals. A new test for uniformity called the H-test is derived for which the probability distribution is an exponential function. This test is shown to have a very good power against most light curve shapes encountered in X- and γ-ray Astronomy and therefore makes the detection of sources with a larger variety of shapes possible. The use of the H-test is suggested if no a priori information about the light curve shape is available. It is also shown how the probability distribution of the test statistics changes when a periodicity search is conducted using very small steps in the period or frequency range. The flux sensitivity for various light curve shapes is also derived for a few tests and this flux is on average a minimum for the H-test

  11. How is service procurement different from goods procurement? Exploring ex ante costs and ex post problems in IT procurement

    NARCIS (Netherlands)

    Wynstra, Finn; Rooks, Gerrit; Snijders, Chris

    2018-01-01

    Several studies suggest that, in practice, service procurement is more challenging than goods procurement. The underlying but largely implicit argument is that the procurement process for services involves higher buyer uncertainty and therefore requires extra efforts to mitigate this uncertainty.

  12. Corruption in emergency procurement.

    Science.gov (United States)

    Schultz, Jessica; Søreide, Tina

    2008-12-01

    Corruption in emergency procurement reduces the resources available for life-saving operations, lowers the quality of products and services provided, and diverts aid from those who need it most.(1) It also negatively influences public support for humanitarian relief, both in the affected country and abroad. This paper aims to unpack and analyse the following question in order to mitigate risk: how and where does corruption typically occur, and what can be done? Suggested strategies reflect a multi-layered approach that stresses internal agency control mechanisms, conflict-sensitive management, and the need for common systems among operators.

  13. Procurement Sustainability Tensions

    DEFF Research Database (Denmark)

    Fayezi, Sajad; Zomorrodi, Maryam; Bals, Lydia

    2018-01-01

    as stakeholder and institutional theory. Design/methodology/approach: The authors use a multiple case study approach. Data are collected through multiple interviews and archival data from eight case companies in Australia. Findings: The authors identify supply chain and company procurement sustainability...... of institutional distance, can characterize the manifestation of PSTs. Practical implications: The findings are instrumental for managers to make informed decisions when dealing with PSTs, and they pave the way for paradoxical leadership given the increasing importance of simultaneous development and balancing...

  14. Industry activities to resolve utility procurement issues

    International Nuclear Information System (INIS)

    Rosch, F.

    1993-01-01

    There are several industry organizations which are active in assisting the utilities in their equipment procurement enhancement. They include the Nuclear Management Resources Council (NUMARC), the Electric Power Research Institute (EPRI), and the Nuclear Procurement Issues Committee (NUPIC). The products include the NUMARC Procurement Initiatives, EPRI procurement related guidelines and databases, and NUPIC joint audits and commercial grade surveys. The industry procurement activities and products are reviewed, and their use by utilities to enhance their procurement process is related. 1 fig

  15. Uzbekistan : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2003-01-01

    Uzbekistan inherited the Soviet system for the procurement of goods, works and services for State needs. This system was suitable for a command economy but lacks the essential elements of competitiveness, transparency and accountability, which are the hallmarks of a market-based approach to government contracting. This Country Procurement Assessment Report (CPAR) comes at a time when a num...

  16. Exploratory use of periodic pumping tests for hydraulic characterization of faults

    Science.gov (United States)

    Cheng, Yan; Renner, Joerg

    2018-01-01

    Periodic pumping tests were conducted using a double-packer probe placed at four different depth levels in borehole GDP-1 at Grimselpass, Central Swiss Alps, penetrating a hydrothermally active fault. The tests had the general objective to explore the potential of periodic testing for hydraulic characterization of faults, representing inherently complex heterogeneous hydraulic features that pose problems for conventional approaches. Site selection reflects the specific question regarding the value of this test type for quality control of hydraulic stimulations of potential geothermal reservoirs. The performed evaluation of amplitude ratio and phase shift between pressure and flow rate in the pumping interval employed analytical solutions for various flow regimes. In addition to the previously presented 1-D and radial-flow models, we extended the one for radial flow in a system of concentric shells with varying hydraulic properties and newly developed one for bilinear flow. In addition to these injectivity analyses, we pursued a vertical-interference analysis resting on observed amplitude ratio and phase shift between the periodic pressure signals above or below packers and in the interval by numerical modeling of the non-radial-flow situation. When relying on the same model the order of magnitude of transmissivity values derived from the analyses of periodic tests agrees with that gained from conventional hydraulic tests. The field campaign confirmed several advantages of the periodic testing, for example, reduced constraints on testing time relative to conventional tests since a periodic signal can easily be separated from changing background pressure by detrending and Fourier transformation. The discrepancies between aspects of the results from the periodic tests and the predictions of the considered simplified models indicate a hydraulically complex subsurface at the drill site that exhibits also hydromechanical features in accord with structural information

  17. Reliability of fitness tests using methods and time periods common in sport and occupational management.

    Science.gov (United States)

    Burnstein, Bryan D; Steele, Russell J; Shrier, Ian

    2011-01-01

    Fitness testing is used frequently in many areas of physical activity, but the reliability of these measurements under real-world, practical conditions is unknown. To evaluate the reliability of specific fitness tests using the methods and time periods used in the context of real-world sport and occupational management. Cohort study. Eighteen different Cirque du Soleil shows. Cirque du Soleil physical performers who completed 4 consecutive tests (6-month intervals) and were free of injury or illness at each session (n = 238 of 701 physical performers). Performers completed 6 fitness tests on each assessment date: dynamic balance, Harvard step test, handgrip, vertical jump, pull-ups, and 60-second jump test. We calculated the intraclass coefficient (ICC) and limits of agreement between baseline and each time point and the ICC over all 4 time points combined. Reliability was acceptable (ICC > 0.6) over an 18-month time period for all pairwise comparisons and all time points together for the handgrip, vertical jump, and pull-up assessments. The Harvard step test and 60-second jump test had poor reliability (ICC < 0.6) between baseline and other time points. When we excluded the baseline data and calculated the ICC for 6-month, 12-month, and 18-month time points, both the Harvard step test and 60-second jump test demonstrated acceptable reliability. Dynamic balance was unreliable in all contexts. Limit-of-agreement analysis demonstrated considerable intraindividual variability for some tests and a learning effect by administrators on others. Five of the 6 tests in this battery had acceptable reliability over an 18-month time frame, but the values for certain individuals may vary considerably from time to time for some tests. Specific tests may require a learning period for administrators.

  18. [Posthumous sperm procurement and use--ethical and legal dilemmas].

    Science.gov (United States)

    Crha, I; Dostál, J; Ventruba, P; Kudela, M; Záková, J

    2004-07-01

    To present a review of bioethical discussion and recommendations concerning posthumous sperm procurement and postmortem parenthood. Review article. Department of Obstetrics and Gynecology, Masaryk University, Brno, Department of Obstetrics and Gynecology, Palacky University, Olomouc. Literature search in Database of Abstracts of Reviews of the Evidence (DARE) and MEDLINEplus. Posthumous sperm procurement and cryopreservation must be performed within 36 hours after death. To established appropriate medical practice, it is important to consider all stakeholders in the decision-making process: the deceased, the requesting party, the child, the physician and the society. There are only few legislative measures concerning postmortem parenthood and posthumous sperm procurement. The essential elements for postmortem reproduction are: judicial order, ethics committee approval, bereavement period of at least 6 month before use. Posthumous sperm procurement is fraught with ethical and legal implications. All stakeholder should be considered. Society for reproductive medicine should prepare acceptable standard protocol.

  19. An investigation into the effectiveness of public entities’ procurement practices

    Directory of Open Access Journals (Sweden)

    Moitswadi Mofokeng

    2014-11-01

    Full Text Available The delivery of services through the procurement of goods and services requires proper strategic leadership and management processes. Inappropriate planning, under-spending of budgets and ineffective procurement form part of the root causes of poor service delivery, as this restricts the movement of resources to the right places. This study identified the leading procurement practices as: procurement strategy and leadership, the procurement process, human resource management, procurement information systems, supplier management and procurement performance management. These practices were then tested in public entities, mainly in Gauteng Province, South Africa, to determine the extent to which they are applied. The study found that there is a major divide between the perception of the level of application of the leading practices and actual implementation. Processes, skills, performance management, information technology (IT systems and supplier management are applied inadequately or inappropriately. Most entities thus show a poor understanding of customer needs and there seems to be a general lack of customer focus. The study highlighted the best practice areas in which public entities are able to focus their efforts to better achieve excellent customer service and thus service delivery.

  20. Experience of manual periodic testing and development of automatic test devices

    International Nuclear Information System (INIS)

    Lorenzen, J.; Bergdahl, B.G.; Oguma, R.; Pazsit, I.; Akerhielm, F.

    1989-01-01

    During more than two decades experience has been gained in the field of process control and instrumentation using signal noise analysis applied to measurements at Swedish nuclear power plants. The methods developed and employed cover areas like: - Sensor and component status test in safety systems during operation, - Monitoring of BWR-stability during start-up, - Thermal time constant analysis on irradiated fuel, - Monitoring of instrument tube vibrations during operation, Self-diagnosing neutron detectors. Together with stationary surveillance systems like SOLNAS for Early Warning based on spectral analysis and Pattern Recognition we use a mobile mini-computer twin station and PC/AT sets. Further theory development goes hand in hand with experimental results obtained through measurement campaigns. In the following some of the work under progress, demonstrated or already applied is described and the results are reported correspondingly

  1. Interactivity of marketing and procurement

    Directory of Open Access Journals (Sweden)

    Lazarević Dragan

    2007-01-01

    Full Text Available General conclusions regarding the close links between marketing and procurement side of the marketing process would be expressed as follows: Interactive link between marketing and procurement is just proportionate to a level of company's market orientation. Establishment of an interactive link between marketing and procurement fields would reflect on pricing. Besides price competition, establishment of an integral approach through comprehensive understanding of market relations, will set up conditions for company to meet customers' needs in the most optimal way. Therefore the total result will be advanced and a company with this kind of orientation can become a market leader.

  2. 40 CFR 35.6565 - Procurement methods.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  3. Photovoltaic procurement strategies: an assessment of supply issues

    Energy Technology Data Exchange (ETDEWEB)

    Posner, D.; Costello, D.

    1980-02-01

    This review report presents the results of an analysis of alternative approaches to the design of a federal photovoltaics procurement program. Advantages and disadvantages of large purchases at fixed prices and smaller purchases for testing and demonstrating the technology are presented. The objectives and possible impacts of these purchase programs on the photovoltaic industry are described. The reactions of the industry to alternative purchase programs were assessed using personal interviews with selected companies currently active in photovoltaics. The report begins with a review of the impacts of federal procurements on other innovations, including the electronics industry, and suggests the relation of these procurements to photovoltaics. The methodology for conducting the interviews is presented next. The results of the interviews are summarized into possible scenarios of future developments in the industry and into discussions of key issues in the design of a procurement program. An appendix on the current structure of the photovoltaic industry is provided.

  4. Sequential improvements in organ procurement increase the organ donation rate.

    Science.gov (United States)

    Billeter, Adrian T; Sklare, Seth; Franklin, Glen A; Wright, Jerry; Morgan, Gary; O'Flynn, Paul E; Polk, Hiram C

    2012-11-01

    Organ demand exceeds availability of transplantable organs. Organ procurement continues to suffer from failures to identify potential donors, inability to obtain consent for donation, as well as failures to retrieve certain organs as donor demographics change. The purpose of this article is to propose how sequentially introduced measures can increase organ donation rates as well as improve organ procurement. We analysed the effect of stepwise improvements in the organ procurement process patients in a university-based surgical intensive care unit over a 20-year period. We related newly introduced measures in the organ retrieval process with changes in donation rates. We specifically targeted these three main steps in the donation process: donor identification, conversion of potential donors to actual donors, and organ protection during the procurement process. Finally, we assessed the effect of the same measures on organ procurement after introduction in other hospitals of the same organ procurement region. Introduction of quality improvement steps increased all of the observed parameters. The number of organ donors was stabilised due to a better identification of potential donors, a major increase in conversion from potential to actual donors, and an increase in extended criteria donor. Improvements in organ protection led to higher rates of organs transplanted per donor and increased recovery of lungs and hearts despite increasing donor age. The same measures were introduced successfully in other hospitals in our organ procurement region. Sequential improvements in organ procurement can increase the yield of retrieved organs. The same measures can be applied to other hospitals and lead to comparable improvements in organ donation. Published by Elsevier Ltd.

  5. PROMIS (Procurement Management Information System)

    Science.gov (United States)

    1987-01-01

    The PROcurement Management Information System (PROMIS) provides both detailed and summary level information on all procurement actions performed within NASA's procurement offices at Marshall Space Flight Center (MSFC). It provides not only on-line access, but also schedules procurement actions, monitors their progress, and updates Forecast Award Dates. Except for a few computational routines coded in FORTRAN, the majority of the systems is coded in a high level language called NATURAL. A relational Data Base Management System called ADABAS is utilized. Certain fields, called descriptors, are set up on each file to allow the selection of records based on a specified value or range of values. The use of like descriptors on different files serves as the link between the falls, thus producing a relational data base. Twenty related files are currently being maintained on PROMIS.

  6. Procurement Policy for Armored Vehicles

    National Research Council Canada - National Science Library

    Jolliffe, Richard B; Burton, Bruce A; Carros, Deborah L; Schaefer, Beth K; Truong, Linh; Palmer, Kevin A; Chun, Judy M; Smith, Jessica M; Abraham, Amanda M; Peters, Anthony R

    2007-01-01

    Congresswoman Louise M. Slaughter requested that the Inspector General (IG), DoD review the DoD procurement history for body armor and armored vehicles and determine whether officials properly followed contracting policies...

  7. Computer aided periodical and regulated service tests on radiation measuring systems

    International Nuclear Information System (INIS)

    Sandner, W.; Lin, R.; Rothhaupt, W.

    1994-01-01

    Measuring systems for radioactive radiation, which must be registered by official order, have to be tested periodically according to laid down rules (WKP). A strategy for a test-device was drawn up for a flexible adaption of the procedure to individual requests, but also for a standardization of the logical interface to the measuring system. Especially the interaction of testing and normal measuring procedures is clearly defined and transparent; the original functional parts of the measuring run are used during the test as far as possible. Adapation to individual requirements is controlled by ASCII-Files, so that the program code remains unchanged. The functional possibilities are extensive also for the inspections by customers and authorities. Due to the nearly automatical run of the procedure, including printout of the results, the tests are always comparable. The standard was checked by some actual projects, basede on SYSTEM 7000 (Thermo Instrument Systems GmbH) and PC runing under DOS. (orig.) [de

  8. The organization of organ procurement.

    Science.gov (United States)

    Prottas, J M

    1989-01-01

    The American organ procurement system has improved and matured in the last five years. At the same time, the basic challenges facing it have remained substantially the same because the moral and legal framework of the system has not changed. Success at organ procurement continues to depend on the voluntary cooperation of medical professionals and the families of potential organ donors. The generosity of the American public is so great that the primary challenge facing organ procurement agencies is obtaining cooperation from hospitals and medical professionals. This calls for a "marketing" orientation aimed at those hospitals and professionals who are most likely to treat potential donors. The last five years have seen a more general acceptance of this appreciation of the central task of organ procurement. As a result, the overall effectiveness of the system has improved, as measured by the number of organs procured on a per capita basis and by the number of multiorgan donors obtained. Much of this improvement can be attributed to the diffusion of organizational techniques and approaches, and this diffusion has been encouraged by the involvement of national organizations and public bodies in the organ procurement community. The system remains uneven in its effectiveness and further improvement is possible. It is also possible that the next general round of improvement will result from the application of businesslike information management and marketing techniques.

  9. Sustainable Procurement in Practice: Explaining the Degree of Sustainable Procurement from an Organisational Perspective

    NARCIS (Netherlands)

    J. Grandia (Jolien); S.M. Groeneveld (Sandra); B.S. Kuipers (Ben); A.J. Steijn (Bram)

    2013-01-01

    textabstractSustainable procurement is often used to reduce negative environmental impacts related to production and consumption. Several studies in the sustainable procurement literature have identified potential drivers of and barriers to sustainable procurement, which are often organisational in

  10. New harvesting technology in forest fuel procurement

    Energy Technology Data Exchange (ETDEWEB)

    Raitila, J. (VTT Technical Research Centre of Finland, Jyvaeskylae (Finland)), Email: jyrki.raitila@vtt.fi; Kaerhae, K. (Metsaeteho Oy, Helsinki (Finland)), Email: kalle.karha@metsateho.fi; Jylhae, P. (Finnish Forest Research Inst., Kannus (Finland)), Email: paula.jylha@metla.fi; Laitila, J. (Finnish Forest Research Inst., Joensuu (Finland)), Email: juha.laitila@metla.fi

    2009-07-01

    In order to increase the use of forest fuels, a regional development project was launched in the fall of 2008. The co-ordinator of the project is Metsaekeskus Keski-Suomi (Forestry Centre of Central Finland), while VTT (Technical Research Centre of Finland) is in charge of research and technical development. The aim of this project is to enhance energy wood procurement from early thinnings, to develop the supply chains of pine stump extraction, and to reduce storage losses of energy wood at roadside landings and at terminals. The results of a pre-feasibility study on the first-generation feller-bundler (Fixteri) by Metsaeteho Oy and the Finnish Forest Research Institute indicates that whole-tree bundling might enable undercutting of the current costs of separate procurement of pulp-wood and energy wood from first-thinning stands. The greatest cost-saving potential lies in small-diameter (d{sub 1.3} = 7-10 cm) first-thinning stands, which are currently relatively unprofitable sites for conventional pulpwood procurement based on single-tree harvesting. Preliminary tests of seasoning of whole-tree bundles have been very encouraging. In some cases the moisture content of energy wood bundles has decreased from 55 % to 25 % after about year of seasoning at the roadside (two summers). One of the most promising devices for pine stump harvesting was developed by Karelian Puu ja Metalli Oy. (orig.)

  11. Lung Focused Resuscitation at a Specialized Donor Care Facility Improves Lung Procurement Rates.

    Science.gov (United States)

    Chang, Stephanie H; Kreisel, Daniel; Marklin, Gary F; Cook, Lindsey; Hachem, Ramsey; Kozower, Benjamin D; Balsara, Keki R; Bell, Jennifer M; Frederiksen, Christine; Meyers, Bryan F; Patterson, G Alexander; Puri, Varun

    2018-05-01

    Lung procurement for transplantation occurs in approximately 20% of brain dead donors and is a major impediment to wider application of lung transplantation. We investigated the effect of lung protective management at a specialized donor care facility on lung procurement rates from brain dead donors. Our local organ procurement organization instituted a protocol of lung protective management at a freestanding specialized donor care facility in 2008. Brain dead donors from 2001 to 2007 (early period) were compared with those from 2009 to 2016 (current period) for lung procurement rates and other solid-organ procurement rates using a prospectively maintained database. An overall increase occurred in the number of brain dead donors during the study period (early group, 791; late group, 1,333; p procurement rate (lung donors/all brain dead donors) improved markedly after the introduction of lung protective management (early group, 157 of 791 [19.8%]; current group, 452 of 1,333 [33.9%]; p procurement rate (total number of organs procured/donor) also increased during the study period (early group, 3.5 organs/donor; current group, 3.8 organs/donor; p = 0.006). Lung protective management in brain dead donors at a specialized donor care facility is associated with higher lung utilization rates compared with conventional management. This strategy does not adversely affect the utilization of other organs in a multiorgan donor. Copyright © 2018 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  12. Technology transfer and technological learning through CERN's procurement activity

    CERN Document Server

    Autio, Erkko; Hameri, Ari-Pekka; CERN. Geneva

    2003-01-01

    This report analyses the technological learning and innovation benefits derived from CERN's procurement activity during the period 1997-2001. The base population of our study, the technology-intensive suppliers to CERN, consisted of 629 companies out of 6806 companies during the same period, representing 1197 MCHF in procurement. The main findings from the study can be summarized as follows: the various learning and innovation benefits (e.g., technological learning, organizational capability development, market learning) tend to occur together. Learning and innovation benefits appear to be regulated by the quality of the supplier's relationship with CERN: the greater the amount of social capital built into the relationship, the greater the learning and innovation benefits. Regardless of relationship quality, virtually all suppliers derived significant marketing reference benefits from CERN. Many corollary benefits are associated with procurement activity. As an example, as many as 38% of the respondents devel...

  13. Electrical conductivity testing of corn seeds as influenced by temperature and period of storage

    OpenAIRE

    Fessel,Simone Aparecida; Vieira,Roberval Daiton; Cruz,Mara Cristina Pessoa da; Paula,Rinaldo Cesar de; Panobianco,Maristela

    2006-01-01

    The objective of this work was to evaluate the effects of temperature (10, 20, 30, 20/10 and 30/10ºC) and period of storage on electrical conductivity (EC) in four seed lots of corn (Zea mays L.), as well as the mineral composition of the soaking solution. EC test determines indirectly the integrity of seed membrane systems, and is used for the assessment of seed vigor, because this test detects the seed deterioration process since its early phase. The research comprised determinations o...

  14. The importance of microbiological tests of vaginal secretion during reproductive period

    Directory of Open Access Journals (Sweden)

    Arsić-Arsenijević Valentina S.

    2004-01-01

    Full Text Available Vaginal infections, during reproductive period are frequent and although not life treating, they can affect their normal functions. They can also affect wommen's fertility as well as the course of pregnancy. The outcome of pregnancy can be endangered due to the possibility of infection of newborn while passing trough birth canal of the infected mother. As statistically shown, bacterial vaginosis is considerably more often found with the patients having precancerous changes on cervix, or diagnosed cancer of cervix, comparing with women with healthy cervix. It can also cause the apperance of postoperative pelvic cellulitis after hysterectomy. On the other side, the presence of S. agalactiae in vaginal secretion may cause very serious and lethal infections of the newborn such as meningitis, pneumonia and sepsis. As for protozoa T. vaginalis it has been shown that it could cause reduced fertility ability and that during pregnancy it could demage fetal membranes and bring to its premature rupture and premature birth. There is also increased risk of cervix cancer. During reproductive period of women especially if risk factors are existing such as hormone therapy, diabetes mellitus type 1 and applications of wide range antibiotics, vaginal fungal infections caused by Candida can frequently appear. These infection apart from the discomfort like itch and affluent secretion they can also mean diagnostic and therapeutical problem. Regular microbiological test of women are highly recommended during reproductive period as standard for bacterial vaginosis, fungal and trichomonas infections. If those results appear negative, further microbiological tests are necessary. Such tests which are more elaborate, more timely and more expensive are referring to tests on chlamidia, micoplasma and some viruses that can also be the cause of vaginal secretion disbalance in women during reproductive period.

  15. Effects of procurement on project performance:a survey of Swedish construction clients

    OpenAIRE

    Eriksson, Per-Erik; Vennström, Anders

    2009-01-01

    In order to increase the efficiency of the construction industry development and improvement of procurement procedures is vital. The purpose of this investigation is to increase the understanding of how procurement procedures affect project performance. A procurement model including eight hypotheses is first developed on the basis of a literature review and then tested through multivariate statistical techniques based on empirical data collected through a survey investigation of 106 Swedish c...

  16. Extinction of Chained Instrumental Behaviors: Effects of Procurement Extinction on Consumption Responding

    Science.gov (United States)

    Thrailkill, Eric A.; Bouton, Mark E.

    2015-01-01

    Instrumental behavior often consists of sequences or chains of responses that minimally include procurement behaviors that enable subsequent consumption behaviors. In such chains, behavioral units are linked by access to one another and eventually to a primary reinforcer, such as food or a drug. The present experiments examined the effects of extinguishing procurement responding on consumption responding after training of a discriminated heterogeneous instrumental chain. Rats learned to make a procurement response (e.g., pressing a lever) in the presence of a distinctive discriminative stimulus; making that response led to the presentation of a second discriminative stimulus that set the occasion for a consumption response (e.g., pulling a chain), which then produced a food-pellet reinforcer. Experiment 1 showed that extinction of either the full procurement-consumption chain or procurement alone weakened the consumption response tested in isolation. Experiment 2 replicated the procurement extinction effect and further demonstrated that the opportunity to make the procurement response, as opposed to simple exposure to the procurement stimulus alone, was required. In Experiment 3, rats learned 2 distinct discriminated heterogeneous chains; extinction of 1 procurement response specifically weakened the consumption response that had been associated with it. The results suggest that learning to inhibit the procurement response may produce extinction of consumption responding through mediated extinction. The experiments suggest the importance of an associative analysis of instrumental behavior chains. PMID:25915751

  17. Persepsi Pengguna Layanan Pengadaan Barang dan Jasa pada Pemerintah Kota Yogyakarta terhadap Implementasi Sistem E Procurement

    Directory of Open Access Journals (Sweden)

    Ita Akyuna Nightisabha

    2011-03-01

    Full Text Available This study aims to evaluate the implementation of electronic procurement of goods and services by the Government City of Yogyakarta, as an effort to create good governance especially in terms of procurement. This study compares the perceptions of user that consist of procurement committee and the providers of goods and services. Research location is in Layanan Pengadaan Secara Elektronik (LPSE of Government City of Yogyakarta as a system developer with the sample of the procurement committee and partner of goods and services that are spread in Yogyakarta and surrounding areas. This research uses t-test by using a reference measurement system on the success of end-user computing satisfaction developed by Torzadeh and Doll (1991. The results show a difference of perception between the committee and the procurement of goods and services providers to the implementation of e-proc system. There is difference in perception between users of e-procurement supplier of goods / services and the procurement committee. Implementation of e-procurement system is being run by the Government City of Yogyakarta is currently has not been relatively applied, because the technology gap that has led to the differences in perception between the committee and the procurement of goods and services providers.Keywords: good governance, e-procurement, perception

  18. Opto-mechanical assembly procurement for the National Ignition Facility

    International Nuclear Information System (INIS)

    House, W.; Simon, T.

    1999-01-01

    A large number of the small optics procurements for the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) will be in the form of completely assembled, tested, and cleaned subsystems. These subsystems will be integrated into the NIF at LLNL. To accomplish this task, the procurement packages will include, optical and mechanical drawings, acceptance test and cleanliness requirements. In January 1999, the first such integrated opto-mechanical assembly was received and evaluated at LLNL. With the successful completion of this important trial procurement, we were able to establish the viability of purchasing clean, ready to install, opto-mechanical assemblies from vendors within the optics industry. 32 vendors were chosen from our supplier database for quote, then five were chosen to purchase from. These five vendors represented a cross section of the optics industry. From a ''value'' catalog supplier (that did the whole job internally) to a partnership between three specialty companies, these vendors demonstrated they have the ingenuity and capability to deliver cost competitive, NIF-ready, opto- mechanical assemblies. This paper describes the vendor selection for this procurement, technical requirements including packaging, fabrication, coating, and cleanliness specifications, then testing and verification. It also gives real test results gathered from inspections performed at LLNL that show how our vendors scored on the various requirements. Keywords: Opto-Mechanical, assembly, NIF, packaging, shipping, specifications, procurement, MIL-STD-1246C, surface cleanliness

  19. PROCUREMENT INSOURCING VS. PROCUREMENT OUTSOURCING: EVIDENCE FROM SERBIA

    Directory of Open Access Journals (Sweden)

    Slobodan Acimovic

    2016-11-01

    Full Text Available One of the most important strategic decisions of a company is to choose whether to insource or outsource a particular group of activities or a business function. The trend of outsourcing those activities which do not form a part of the company core competences is becoming more and more present in business practice. The aim of the analysis within this paper is to review the mentioned trend from the position of organizing the company procurement activities. The analysis shows that there is no unique trend concerning outsourcing all logistics activities, which do not form a part of the company core competences. Unlike the majority of other logistics activities, which as non-basic, tend to be outsourced, procurement dominantly stays insourced. Finally, based on the empirical evidence obtained from a survey carried out among 52 companies in Serbia, it is concluded that even if procurement is outsourced, this trend is more present among service than production companies.

  20. Overview of JSC “NIKIET” activity on ITER Procurement Arrangements

    Energy Technology Data Exchange (ETDEWEB)

    Leshukov, A.Yu., E-mail: leshu@nikiet.ru [Joint-Stock Company “N.A. Dollezhall Research and Development Institute of Power Engineering”, (JSC “NIKIET”), 107140, Malaya Krasnoselskaya 2/8, Moscow (Russian Federation); Dragunov, Yu. G.; Strebkov, Yu. S.; Kirillov, S.Yu.; Makarov, S.V.; Trofimovich, P.D.; Dubinin, G.V.; Maksimov, V.A.; Sviridenko, M.N.; Razmerov, A.V.; Parshutin, E.V.; Khomyakov, S.E.; Kolganov, V.Yu.; Zhmakin, A.V. [Joint-Stock Company “N.A. Dollezhall Research and Development Institute of Power Engineering”, (JSC “NIKIET”), 107140, Malaya Krasnoselskaya 2/8, Moscow (Russian Federation); Belyakov, V.A.; Mazul, I.V.; Gervash, A.A. [JSC “NIIEFA” (D.V. Efremov Institute), 189631, Doroga na Metallostroy, 3, S. Peterburg (Russian Federation); Safronov, V.M.; Romannikov, A.N. [Institution “Project Center ITER”,123182, Square of Academic Kurchatov 1, Moscow (Russian Federation); Eaton, R. [ITER Organization, Route de Vinon sur Verdon CS 90 046 − 13067 Saint Paul lez Durance (France); and others

    2016-11-01

    The two following ITER blanket-relevant Procurement Arrangements (PA) were signed by Russian Federation and ITER Organization in 2014: 1)1.6.P1ARF.01 “Blanket First Wall” (signed on 14-th of February, 2014); 2)1.6.P3.RF.01 “Blanket Module Connections” (signed on 19-th of December, 2014). The first PA is devoted to the development, manufacturing, testing and procuring to ITER site of 179 Enhanced Heat Flux (EHF) First Wall (FW) Panels. These FW panels are intended to withstand the heat flux from plasma up to 4.7 MW/m{sup 2}, and there are two institutions in Russian Federation responsible for the manufacturing, testing and delivering of these panels on the ITER site: JSC “NIIEFA” (Efremov Institute) and JSC “NIKIET”. JSC “NIIEFA” (Efremov Institute) will manufacture the plasma-facing components (PFC) of EHF FW Panels and perform the final assembling of the panels while JSC “NIKIET” will manufacture the FW beam structures, load-bearing structures of PFC and the all the elements of panel attachment system. As for the second PA (“Blanket Module Connectors”) the JSC “NIKIET” is the alone official Supplier and will manufacture and procure blanket flexible supports, electrical insulating key pads and shield block/vacuum vessel electrical connectors. This article briefly describes the joint activity of JSC “NIKIET” and Efremov Institute in the framework of 1.6.P1ARF.01 “Blanket First Wall” Procurement Arrangement and the material on the activity on the second PA. The main achievements on both PAs (during the period of 2014–2015) are presented and also critical issues and plans are underlined.

  1. On the optimal scheduling of periodic tests and maintenance for reliable redundant components

    International Nuclear Information System (INIS)

    Courtois, Pierre-Jacques; Delsarte, Philippe

    2006-01-01

    Periodically, some m of the n redundant components of a dependable system may have to be taken out of service for inspection, testing or preventive maintenance. The system is then constrained to operate with lower (n-m) redundancy and thus with less reliability during these periods. However, more frequent periodic inspections decrease the probability that a component fail undetected in the time interval between successive inspections. An optimal time schedule of periodic preventive operations arises from these two conflicting factors, balancing the loss of redundancy during inspections against the reliability benefits of more frequent inspections. Considering no other factor than this decreased redundancy at inspection time, this paper demonstrates the existence of an optimal interval between inspections, which maximizes the mean time between system failures. By suitable transformations and variable identifications, an analytic closed form expression of the optimum is obtained for the general (m, n) case. The optimum is shown to be unique within the ranges of parameter values valid in practice; its expression is easy to evaluate and shown to be useful to analyze and understand the influence of these parameters. Inspections are assumed to be perfect, i.e. they cause no component failure by themselves and leave no failure undetected. In this sense, the optimum determines a lowest bound for the system failure rate that can be achieved by a system of n-redundant components, m of which require for inspection or maintenance recurrent periods of unavailability of length t. The model and its general closed form solution are believed to be new . Previous work had computed optimal values for an estimation of a time average of system unavailability, but by numerical procedures only and with different numerical approximations, other objectives and model assumptions (one component only inspected at a time), and taking into account failures caused by testing itself, repair and

  2. Characteristic Length Scales in Fracture Networks: Hydraulic Connectivity through Periodic Hydraulic Tests

    Science.gov (United States)

    Becker, M.; Bour, O.; Le Borgne, T.; Longuevergne, L.; Lavenant, N.; Cole, M. C.; Guiheneuf, N.

    2017-12-01

    Determining hydraulic and transport connectivity in fractured bedrock has long been an important objective in contaminant hydrogeology, petroleum engineering, and geothermal operations. A persistent obstacle to making this determination is that the characteristic length scale is nearly impossible to determine in sparsely fractured networks. Both flow and transport occur through an unknown structure of interconnected fracture and/or fracture zones making the actual length that water or solutes travel undetermined. This poses difficulties for flow and transport models. For, example, hydraulic equations require a separation distance between pumping and observation well to determine hydraulic parameters. When wells pairs are close, the structure of the network can influence the interpretation of well separation and the flow dimension of the tested system. This issue is explored using hydraulic tests conducted in a shallow fractured crystalline rock. Periodic (oscillatory) slug tests were performed at the Ploemeur fractured rock test site located in Brittany, France. Hydraulic connectivity was examined between three zones in one well and four zones in another, located 6 m apart in map view. The wells are sufficiently close, however, that the tangential distance between the tested zones ranges between 6 and 30 m. Using standard periodic formulations of radial flow, estimates of storativity scale inversely with the square of the separation distance and hydraulic diffusivity directly with the square of the separation distance. Uncertainty in the connection paths between the two wells leads to an order of magnitude uncertainty in estimates of storativity and hydraulic diffusivity, although estimates of transmissivity are unaffected. The assumed flow dimension results in alternative estimates of hydraulic parameters. In general, one is faced with the prospect of assuming the hydraulic parameter and inverting the separation distance, or vice versa. Similar uncertainties exist

  3. THE BARRIERS OF IMPLEMENTING E-PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Corina Pop Sitar

    2011-01-01

    Full Text Available The concept of e-procurement has many different meanings ranging from shopping on theinternet (through reverse auction to collaborative initiatives taking place in virtualmeetings. There are many forms of e-procurement that can be found in the literature. In thispaper we define the most important forms of e-procurement. Next, we present the mainbarriers of implementing an e-procurement found in the literature. Furthermore, we presenta matrix with the main barriers of e-procurement classified in four main categories. Finally,we elaborated for managers some guidelines in order to overcome the barriers ofimplementing e-procurement.

  4. Strategic contracting practices to improve procurement of health commodities.

    Science.gov (United States)

    Arney, Leslie; Yadav, Prashant; Miller, Roger; Wilkerson, Taylor

    2014-08-01

    Public-sector entities responsible for procurement of essential medicines and health commodities in developing countries often lack the technical capacity to efficiently ensure supply security. Under strict public scrutiny and pressures to be transparent, many agencies continue to use archaic procurement methods and to depend on inflexible forecasts and cumbersome tendering processes. On the basis of semi-structured literature reviews and interviews, we identified framework agreements as a strategic procurement practice used by the U.S. federal government that may also be suitable for global health supply chains. Framework agreements are long-term contracts that provide the terms and conditions under which smaller repeat purchasing orders may be issued for a defined period of time. Such agreements are common in U.S. and United Nations procurement systems and in other developed countries and multilateral organizations. In contrast, framework agreements appear to be seldom used in procurement of health commodities in countries of sub-Saharan Africa. The current practice of floating tenders multiple times a year contributes to long lead times and stock-outs, and it hampers the manufacturer's or supplier's ability to plan and respond to the government's needs. To date, government's use of strategic contracting practices in public procurement of health commodities has not received much attention in most developing countries. It may present an opportunity for substantial improvements in procurement efficiency and commodity availability. Enabling legislation and strengthened technical capacity to develop and manage long-term contracts could facilitate the use of framework contracts in sub-Saharan Africa, with improved supply security and cost savings likely to result.

  5. NASA Procurement Career Development Program

    Science.gov (United States)

    1987-01-01

    The NASA Procurement Career Development Program establishes an agency-wide framework for the management of career development activity in the procurement field. Within this framework, installations are encouraged to modify the various components to meet installation-specific mission and organization requirements. This program provides a systematic process for the assessment of and planning for the development, training, and education required to increase the employees' competence in the procurement work functions. It includes the agency-wide basic knowledge and skills by career field and level upon which individual and organizational development plans are developed. Also, it provides a system that is compatible with other human resource management and development systems, processes, and activities. The compatibility and linkage are important in fostering the dual responsibility of the individual and the organization in the career development process.

  6. URGENSI STUDI TENTANG PROCUREMENT CONTRACT

    Directory of Open Access Journals (Sweden)

    Yohanes Sogar Simamora

    2006-01-01

    Full Text Available Contractualization is kind of goverment activity in acquiring goods, services and infrastructure as well. Procurement contract has several important function especially in enhancing economic development in a state. In Indonesia, this kind of contract also has function in empowering micro economic scale. Since the aim of procurement study is to provide equal protection between public fund interest in one hand and privat sector in the other hand, general principle of contract law must be taken into consideration together with transparency as the most important principle in government contract.

  7. Cornea procurement, preservation and transplantation

    International Nuclear Information System (INIS)

    Hudson Silva

    1999-01-01

    Our experience on this subject is 40 years and we have seen the developments everywhere during this total period. Cornea procurement has been an unsurmountable problem in a large number of countries, mostly due to social and cultural reasons. The requirements for a simple eye bank to manage the supply for a local hospital are minimal. What is the most important is the donor base. In Sri Lanka nurtured in the traditions of Theravada Buddhism the donor base was easy to prepare. We had no difficulties with Christians and Hindus. For Muslims there are Fatwas in favour of donating eyes. But we always found them to be a reluctant group. But in predominantly Muslim countries, it is imperative that social workers should take up this issue, so those thousands may be helped. In all areas where attempts are made to procure comeas, it is important to have a day-and-night service available at short notice to collect any eyes offered. A trained technician with sterilised instruments to obtain eyes and blood sample must be available at a convenient location preferably in a large hospital. Even in places where the supply is infrequent, it is essential to have the readily-sterilised instruments to proceed to a donor site at short notice. To get eyes, general publicity in mass media alone is not sufficient. Such publicity makes people aware of the need for donor eyes and where a technician/doctor is available. What is more important is to canvass personally after a person has died For this purpose trained social workers may be employed, or the technician can do the motivation, as we do in Sri Lanka. Once eyes are removed, it is essential to pay careful attention to the appearance of the cadaver. It should not (and need not) cause any deformity as such event has a profound negative effect on the campaign. Many different preservation methods have been used over the years. Mc Carey-Kaufmann (MK) medium has been the standard for many years, and gives a life span of 4-5 days. The formula

  8. Test of the periodic-orbit approximation in n-disk systems

    International Nuclear Information System (INIS)

    Wirzba, A.

    1993-01-01

    The scattering of a point particle in two dimensions from two (or three) equally-sized (and spaced) circular hard disks is one of the simplest classically hyperbolic scattering problems. Because of this simplicity such systems are well suited for the study of the semiclassical periodic-orbit approximation in the cycle expansion of the dynamical zeta function applied to a quantum-mechanical scattering problem. Especially the predictions of the semiclassical cycle expansion for the quantum-mechanical resonances can be tested in these n-disk systems. Whereas for high wave numbers the cycle expansion gives quite accurate results, there are systematic deviations for low wave numbers from the exact quantum-mechanical values. The low-lying quantum-mechanical resonance poles of the 2- and 3-disk problem are constructed and compared to the cycle-expansion results. The characteristic determinant of the scattering matrix is expanded in terms of simple traces which in turn are related to the classical periodic orbits and possible creeping contributions. It will be shown that for large separations of the disks the correct resonance-pole positions can be extracted just from the knowledge of the lowest traces whose semiclassical limit are the fundamental periodic orbits. Creeping-orbit corrections are shown to be small. (orig.)

  9. TESTING CONVECTIVE-CORE OVERSHOOTING USING PERIOD SPACINGS OF DIPOLE MODES IN RED GIANTS

    Energy Technology Data Exchange (ETDEWEB)

    Montalban, J.; Noels, A.; Dupret, M.-A.; Scuflaire, R. [Institut d' Astrophysique et Geophysique de l' Universite de Liege, Allee du six Aout, 17 B-4000 Liege (Belgium); Miglio, A. [School of Physics and Astronomy, University of Birmingham, Edgbaston, Birmingham B15 2TT (United Kingdom); Ventura, P. [Osservatorio Astronomico di Roma-INAF, via Frascati 33, I-00040 Monteporzio Catone, Rome (Italy)

    2013-04-01

    Uncertainties on central mixing in main-sequence (MS) and core He-burning (He-B) phases affect key predictions of stellar evolution such as late evolutionary phases, chemical enrichment, ages, etc. We propose a test of the extension of extra-mixing in two relevant evolutionary phases based on period spacing ({Delta}P) of solar-like oscillating giants. From stellar models and their corresponding adiabatic frequencies (respectively, computed with ATON and LOSC codes), we provide the first predictions of the observable {Delta}P for stars in the red giant branch and in the red clump (RC). We find (1) a clear correlation between {Delta}P and the mass of the helium core (M{sub He}); the latter in intermediate-mass stars depends on the MS overshooting, and hence it can be used to set constraints on extra-mixing during MS when coupled with chemical composition; and (2) a linear dependence of the average value of the asymptotic period spacing (({Delta}P){sub a}) on the size of the convective core during the He-B phase. A first comparison with the inferred asymptotic period spacing for Kepler RC stars also suggests the need for extra-mixing during this phase, as evinced from other observational facts.

  10. Integrated Procurement Management System, Version II

    Science.gov (United States)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  11. Procurement strategic analysis of nuclear safety equipment

    International Nuclear Information System (INIS)

    Wu Caixia; Yang Haifeng; Li Xiaoyang; Li Shixin

    2013-01-01

    The nuclear power development plan in China puts forward a challenge on procurement of nuclear safety equipment. Based on the characteristics of the procurement of nuclear safety equipment, requirements are raised for procurement process, including further clarification of equipment technical specification, establishment and improvement of the expert database of the nuclear power industry, adoption of more reasonable evaluation method and establishment of a unified platform for nuclear power plants to procure nuclear safety equipment. This paper makes recommendation of procurement strategy for nuclear power production enterprises from following aspects, making a plan of procurement progress, dividing procurement packages rationally, establishing supplier database through qualification review and implementing classified management, promoting localization process of key equipment continually and further improving the system and mechanism of procurement of nuclear safety equipment. (authors)

  12. PVUSA procurement, acceptance, and rating practices for photovoltaic power plants

    Energy Technology Data Exchange (ETDEWEB)

    Dows, R.N.; Gough, E.J.

    1995-09-01

    This report is one in a series of PVUSA reports on PVUSA experiences and lessons learned at the demonstration sites in Davis and Kerman, California, and from participating utility host sites. During the course of approximately 7 years (1988--1994), 10 PV systems have been installed ranging from 20 kW to 500 kW. Six 20-kW emerging module technology arrays, five on universal project-provided structures and one turnkey concentrator, and four turnkey utility-scale systems (200 to 500 kW) were installed. PVUSA took a very proactive approach in the procurement of these systems. In the absence of established procurement documents, the project team developed a comprehensive set of technical and commercial documents. These have been updated with each successive procurement. Working closely with vendors after the award in a two-way exchange provided designs better suited for utility applications. This report discusses the PVUSA procurement process through testing and acceptance, and rating of PV turnkey systems. Special emphasis is placed on the acceptance testing and rating methodology which completes the procurement process by verifying that PV systems meet contract requirements. Lessons learned and recommendations are provided based on PVUSA experience.

  13. public procurement, governance and economic growth

    African Journals Online (AJOL)

    GRACE

    Development (OECD) sees public procurement ―as a strategic policy lever to advance ... financial markets and provision of advisory services to businesses and government. ... Procurement established by the Section 3 of the Act. The BPP is the ... present annual reports to the Minister on the public procurement processes;.

  14. 78 FR 37525 - Procurement List; Deletions

    Science.gov (United States)

    2013-06-21

    .... Contracting Activity: Dept of the Air Force, FA7014 AFDW A7KI, Andrews AFB, MD. Service Type/Location: Laundry... Procurement List. SUMMARY: This action deletes products and services from the Procurement List that were... products and services listed below are no longer suitable for procurement by the Federal Government under...

  15. 22 CFR 226.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement records. 226.46 Section 226.46 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.46 Procurement records...

  16. 10 CFR 436.43 - Procurement planning.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Procurement planning. 436.43 Section 436.43 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Agency Procurement of Energy Efficient Products § 436.43 Procurement planning. (a) Agencies should consider the...

  17. 10 CFR 21.31 - Procurement documents.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Procurement documents. 21.31 Section 21.31 Energy NUCLEAR REGULATORY COMMISSION REPORTING OF DEFECTS AND NONCOMPLIANCE Procurement Documents § 21.31 Procurement documents. Each individual, corporation, partnership, dedicating entity, or other entity subject to the...

  18. 7 CFR 225.17 - Procurement standards.

    Science.gov (United States)

    2010-01-01

    ...) Procurements by public sponsors comply with applicable State or local laws and the standards set forth in 7 CFR part 3016; and (2) Procurements by private nonprofit sponsors comply with standards set forth in 7 CFR... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement standards. 225.17 Section 225.17...

  19. 10 CFR 603.1300 - Procurement contract.

    Science.gov (United States)

    2010-01-01

    ... Used in this Part § 603.1300 Procurement contract. A Federal Government procurement contract. It is a... 10 Energy 4 2010-01-01 2010-01-01 false Procurement contract. 603.1300 Section 603.1300 Energy... Government and a State, a local government, or other non-government entity when the principal purpose of the...

  20. 32 CFR 37.1330 - Procurement contract.

    Science.gov (United States)

    2010-07-01

    ... REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms Used in This Part § 37.1330 Procurement contract. A Federal Government procurement contract. It is a legal instrument which, consistent with 31 U.S... 32 National Defense 1 2010-07-01 2010-07-01 false Procurement contract. 37.1330 Section 37.1330...

  1. Tanzania : Country Procurement Assessment Report, Executive Summary

    OpenAIRE

    World Bank

    2004-01-01

    This Country Procurement Assessment Report (CPAR)intends to determine the compatibility of national procurement law, and practices, with the principles of economy, and with international procurement practices. This CPAR, the second of its kind in Tanzania, looks at the legislative framework, the performance of regulatory functions, the enforcement regime, and the capacity of public sector ...

  2. 76 FR 43988 - Procurement List; Additions

    Science.gov (United States)

    2011-07-22

    ... this work, based on applicable experience. Finally, the purpose of the JWOD Act and the responsibility... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be...

  3. 7 CFR 1780.72 - Procurement methods.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  4. 76 FR 26279 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-05-06

    ...-service area; clean and sanitize food service equipment, utensil cleaning, and dishwashing; clean pots... additions to the Procurement List. SUMMARY: The Committee is proposing to add services to the Procurement... in this notice will be required to procure the services listed below from nonprofit agencies...

  5. Competitive Procurement and Asset Specificity

    NARCIS (Netherlands)

    Sorana, V.

    2003-01-01

    This paper studies the effects of asset specificity on the performance of procurement auctions with subcontracting and asset sales.The analysis highlights the role of several asset features like transfer costs, type of alternative uses and maintenance requirements.It is argued that, if bargaining

  6. Organ procurement: let's presume consent

    OpenAIRE

    Moustarah, F

    1998-01-01

    IN WINNING FIRST PRIZE in the Logie Medical Ethics Essay Contest in 1997, Dr. Fady Moustarah made a strong and compelling argument in favour of presumed consent in the procurement of donor organs. He stressed that a major education campaign will be needed when such a policy is adopted lest some people begin to regard physicians as "organ vultures."

  7. Pakistan : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2000-01-01

    This report analyzes Pakistan's procurement system, and presents an extensive set of recommendations for strengthening same. It reviews the legal, and regulatory framework, as well as the mandatory registration and/or pre-qualification of suppliers, and contractors, and negotiation practices, and, analyzes bidding document issues for recommendation. Human resources development, auditing pr...

  8. Procurement Engineering Process for Commercial Grade Item Dedication

    International Nuclear Information System (INIS)

    Park, Jong-Hyuck; Park, Jong-Eun; Kwak, Tack-Hun; Yoo, Keun-Bae; Lee, Sang-Guk; Hong, Sung-Yull

    2006-01-01

    Procurement Engineering Process for commercial grade item dedication plays an increasingly important role in operation management of Korea Nuclear Power Plants. The purpose of the Procurement Engineering Process is the provision and assurance of a high quality and quantity of spare, replacement, retrofit and new parts and equipment while maximizing plant availability, minimizing downtime due to parts unavailability and providing reasonable overall program and inventory cost. In this paper, we will review the overview requirements, responsibilities and the process for demonstrating with reasonable assurance that a procured item for potential nuclear safety related services or other essential plant service is adequate with reasonable assurance for its application. This paper does not cover the details of technical evaluation, selecting critical characteristics, selecting acceptance methods, performing failure modes and effects analysis, performing source surveillance, performing quality surveys, performing special tests and inspections, and the other aspects of effective Procurement Engineering and Commercial Grade Item Dedication. The main contribution of this paper is to provide the provision of an overview of Procurement Engineering Process for commercial grade item

  9. 75 FR 76069 - Random Drug and Alcohol Testing Percentage Rates of Covered Aviation Employees for the Period of...

    Science.gov (United States)

    2010-12-07

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Random Drug and Alcohol Testing... minimum random drug and alcohol testing percentage rates for the period January 1, 2011, through December... Regulations Title 14, section 120.109(b) (for drug testing), and 120.217(c) (for alcohol testing). Issued in...

  10. 77 FR 71669 - Random Drug and Alcohol Testing Percentage Rates of Covered Aviation Employees for the Period of...

    Science.gov (United States)

    2012-12-03

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Random Drug and Alcohol Testing... the minimum random drug and alcohol testing percentage rates for the period January 1, 2013, through... Regulations Title 14, Sec. Sec. 120.109(b) (for drug testing), and 120.217(c) (for alcohol testing). Issued in...

  11. 76 FR 74843 - Random Drug and Alcohol Testing Percentage Rates of Covered Aviation Employees for the Period of...

    Science.gov (United States)

    2011-12-01

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Random Drug and Alcohol Testing... the minimum random drug and alcohol testing percentage rates for the period January 1, 2012, through... Regulations Title 14, Sec. 120.109(b) (for drug testing), and 120.217(c) (for alcohol testing). Issued in...

  12. 78 FR 77196 - Random Drug and Alcohol Testing Percentage Rates of Covered Aviation Employees for the Period of...

    Science.gov (United States)

    2013-12-20

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Random Drug and Alcohol Testing... the minimum random drug and alcohol testing percentage rates for the period January 1, 2014, through... Federal Regulations Title 14, section 120.109(b) (for drug testing), and 120.217(c) (for alcohol testing...

  13. Water chemistry experiences in a Japanese BWR during preoperational test period

    International Nuclear Information System (INIS)

    Nagasawa, K.; Maeda, K.; Nakamura, M.

    1994-01-01

    The interest in organic impurities intrusion into the BWR's coolant has been increased in recent years. Organic impurities can be measured as total organic carbons (TOC) by using commercial TOC measuring instruments. The corrosive impurities such as sulfates and chlorides, produced by decomposition of the TOC, will enhance the crack growth rate of stress corrosion cracking (SCC) in the reactor cooling system. During the preoperational test period, the reactor water quality changed remarkably by TOC intrusion. The TOC intrusion was monitored by measuring main steam conductivity. It is appeared that the main steam conductivity measurement is one of the effective and reliable techniques to detect the TOC intrusion into the reactor. (authors). 4 figs., 5 refs

  14. Combining periodic hydraulic tests and surface tilt measurements to explore in situ fracture hydromechanics

    Science.gov (United States)

    Schuite, Jonathan; Longuevergne, Laurent; Bour, Olivier; Guihéneuf, Nicolas; Becker, Matthew W.; Cole, Matthew; Burbey, Thomas J.; Lavenant, Nicolas; Boudin, Frédéric

    2017-08-01

    Fractured bedrock reservoirs are of socio-economical importance, as they may be used for storage or retrieval of fluids and energy. In particular, the hydromechanical behavior of fractures needs to be understood as it has implications on flow and governs stability issues (e.g., microseismicity). Laboratory, numerical, or field experiments have brought considerable insights to this topic. Nevertheless, in situ hydromechanical experiments are relatively uncommon, mainly because of technical and instrumental limitations. Here we present the early stage development and validation of a novel approach aiming at capturing the integrated hydromechanical behavior of natural fractures. It combines the use of surface tiltmeters to monitor the deformation associated with the periodic pressurization of fractures at depth in crystalline rocks. Periodic injection and withdrawal advantageously avoids mobilizing or extracting significant amounts of fluid, and it hinders any risk of reservoir failure. The oscillatory perturbation is intended to (1) facilitate the recognition of its signature in tilt measurements and (2) vary the hydraulic penetration depth in order to sample different volumes of the fractured bedrock around the inlet and thereby assess scale effects typical of fractured systems. By stacking tilt signals, we managed to recover small tilt amplitudes associated with pressure-derived fracture deformation. Therewith, we distinguish differences in mechanical properties between the three tested fractures, but we show that tilt amplitudes are weakly dependent on pressure penetration depth. Using an elastic model, we obtain fracture stiffness estimates that are consistent with published data. Our results should encourage further improvement of the method.

  15. Regulations in the German countries in the field of green public procurement

    Energy Technology Data Exchange (ETDEWEB)

    Hermann, Andreas; Acker, Hendrik [Oeko-Institut e.V. - Institut fuer Angewandte Oekologie e.V., Freiburg im Breisgau (Germany)

    2011-12-15

    The task of the Oeko-Institut e.V. (Freiburg, Federal Republic of Germany) consisted in creating an overview of the regulations currently in force at country level concerning the promotion of green public procurement. The investigation focused on legally binding targets contributing to the green public procurement of goods and services. Of particular interest to the investigation was the question of whether the countries have in the intervening period heeded the call of the Federal government on the procurement of energy-intensive products and services or the joint instruction on the procurement of wood products. The aim of the investigation under consideration was to use the overview to make a contribution to the description of the status quo in green public procurement in Germany and, where applicate, to identify examples of best practice.

  16. Procurement planning in oil refining industries considering blending operations

    DEFF Research Database (Denmark)

    Oddsdottir, Thordis Anna; Grunow, Martin; Akkerman, Renzo

    2013-01-01

    This paper addresses procurement planning in oil refining, which has until now only had limited attention in the literature. We introduce a mixed integer nonlinear programming (MINLP) model and develop a novel two-stage solution approach, which aims at computational efficiency while addressing...... parameters than in previous literature. The developed approach is tested using historical data from Statoil A/S as well as through a comprehensive numerical analysis. The approach generates a feasible procurement plan within acceptable computation time, is able to quickly adjust an existing plan to take...

  17. Testing a new application for TOPSIS: monitoring drought and wet periods in Iran

    Science.gov (United States)

    Roshan, Gholamreza; Ghanghermeh, AbdolAzim; Grab, Stefan W.

    2018-01-01

    Globally, droughts are a recurring major natural disaster owing to below normal precipitation, and are occasionally associated with high temperatures, which together negatively impact upon human health and social, economic, and cultural activities. Drought early warning and monitoring is thus essential for reducing such potential impacts on society. To this end, several experimental methods have previously been proposed for calculating drought, yet these are based almost entirely on precipitation alone. Here, for the first time, and in contrast to previous studies, we use seven climate parameters to establish drought/wet periods; these include: T min, T max, sunshine hours, relative humidity, average rainfall, number of rain days greater than 1 mm, and the ratio of total precipitation to number of days with precipitation, using the technique for order of preference by similarity to ideal solution (TOPSIS) algorithm. To test the TOPSIS method for different climate zones, six sample stations representing a variety of different climate conditions were used by assigning weight changes to climate parameters, which are then applied to the model, together with multivariate regression analysis. For the six stations tested, model results indicate the lowest errors for Zabol station and maximum errors for Kermanshah. The validation techniques strongly support our proposed new method for calculating and rating drought/wet events using TOPSIS.

  18. Level of satisfaction and issues with procurement systems used in the Malaysian public sector

    Directory of Open Access Journals (Sweden)

    Mastura Jaafar

    2013-03-01

    Full Text Available Since the declaration of Malaysian independence, the public sector has significantly contributed to the country’s development. In the 1990s, a new procurement system was developed due to CIBD various changes in the construction industry. Since that period, the poor quality of public sector projects has started to attract public attention. This paper describes a study that was conducted to identify the dominant public procurement systems in place, the problems associated with these systems, and the satisfaction level of the industry players in the Malaysian construction industry. The results were drawn from 84 survey responses and interviews with industry players. The public sector is using a traditional system inherited from the British, with an intention to adopt new procurement systems. Aside from the disputes that are present in most systems, the public sector seems to encounter particular problems in relation to capabilities, time, and cost of the major procurement systems used. Traditional work culture and the industry environment influence public sector practice, which accounts for the modifications of each procurement system used. Thus, the full advantages of using an alternative procurement system may not be realised in public sector organizations. This produces an average level of satisfaction gained from the procurement system adopted. As a developing country, Malaysia needs to exert significant efforts to improve the public procurement system. 

  19. Level of satisfaction and issues with procurement systems used in the Malaysian public sector

    Directory of Open Access Journals (Sweden)

    Mastura Jaafar

    2013-03-01

    Full Text Available Since the declaration of Malaysian independence, the public sector has significantly contributed to the country’s development. In the 1990s, a new procurement system was developed due to CIBD various changes in the construction industry. Since that period, the poor quality of public sector projects has started to attract public attention. This paper describes a study that was conducted to identify the dominant public procurement systems in place, the problems associated with these systems, and the satisfaction level of the industry players in the Malaysian construction industry. The results were drawn from 84 survey responses and interviews with industry players. The public sector is using a traditional system inherited from the British, with an intention to adopt new procurement systems. Aside from the disputes that are present in most systems, the public sector seems to encounter particular problems in relation to capabilities, time, and cost of the major procurement systems used. Traditional work culture and the industry environment influence public sector practice, which accounts for the modifications of each procurement system used. Thus, the full advantages of using an alternative procurement system may not be realised in public sector organizations. This produces an average level of satisfaction gained from the procurement system adopted. As a developing country, Malaysia needs to exert significant efforts to improve the public procurement system.

  20. Controlling fuel costs: Procurement strategies and regulatory standards

    International Nuclear Information System (INIS)

    Einhorn, H.A.; Levi, B.I.

    1992-01-01

    Since the oil price shocks and inflation of the 1970s, regulatory authorities and utilities have devoted considerable attention to controlling energy costs while maintaining reliable service. Although much of this concern has been directed towards capital cost containment, increasing scrutiny has been applied to a broad range of variable costs, especially to fuel procurement expenditures. With some 40% to 65% of the electric utility industry's annual operation and maintenance expenses paid to secure fuel supplies, even a small difference in fuel costs could have a substantial impact on costs to ratepayers. This increased attention to fuel cost containment can be expected to intensify as implementation of the 1990 amendments to the Clean Air Act affects fuel purchase decisions. To assure that fuel is purchased in a responsible and cost-effective manner, some state jurisdictions have initiated periodic reviews (audits) of the procurement practices that electric utilities follow when purchasing fuel. While a utility must demonstrate how it purchases fuel, there is wide variation in interest and scope of audits among jurisdictions. In this paper, the authors review: (1) the regulatory environment within which fuel procurement and audits occur, and (2) some particularly controversial issues that will receive increasing attention as the practice of conducting fuel procurement audits spreads

  1. Temperature buffer test. Sensors data report (Period 030326-100301) Report No: 13

    International Nuclear Information System (INIS)

    Goudarzi, Reza; Aakesson, Mattias; Nilsson, Ulf

    2010-12-01

    displacement was measured in three points. The water inflow and water pressure in the outer sand filter was also measured. A general conclusion is that the measuring systems and transducers have worked well and almost all sensors have delivered reliable values. An exception is the Relative Humidity sensors in the high temperature area around the lower heater, where some sensors have failed. The dense arrays of thermocouples at the mid-height of the two heaters appear to be useful for examining the dehydration/hydration process qualitatively. In the lower section there were clear signs of early dehydration in a 0.15 m annular zone around the heater. The resaturation of this part has been followed during the test period. Most humidity sensors measurements in the bentonite buffer have been insignificant during the second half of the test period, indicating that the material was close to saturation. However in the upper section (Ring 9), the fact that the pore pressure started to equilibrate with the water pressure in the sand filter indicated that fill water saturation was reached in this part. This sand slot between the bentonite column and the surrounding rock has been used for artificial wetting. More than the water theoretically needed to fill up the sand slot and to saturate the bentonite has been injected, which proves that the system was not hydraulically closed but leaked towards the rock (EDZ). The high sand slot injection pressure required to maintain the inflow shows the weakness of the injection system (clogging of the filter tips). An unclogging action was therefore performed by injecting demineralised water instead of ground water, as it was done since the beginning of the experiment. This action proved successful, and after this modification it was possible to maintain a hydraulic pressure in the filter around 4 bar absolute. The decrease in total pressure and increase in suction that was recorded around the upper heater from day 225 to day 370 has been caused by

  2. Temperature buffer test. Sensors data report (Period 030326-100301) Report No: 13

    Energy Technology Data Exchange (ETDEWEB)

    Goudarzi, Reza; Aakesson, Mattias; Nilsson, Ulf [Clay Technology AB, Lund (Sweden)

    2010-12-15

    displacement was measured in three points. The water inflow and water pressure in the outer sand filter was also measured. A general conclusion is that the measuring systems and transducers have worked well and almost all sensors have delivered reliable values. An exception is the Relative Humidity sensors in the high temperature area around the lower heater, where some sensors have failed. The dense arrays of thermocouples at the mid-height of the two heaters appear to be useful for examining the dehydration/hydration process qualitatively. In the lower section there were clear signs of early dehydration in a 0.15 m annular zone around the heater. The resaturation of this part has been followed during the test period. Most humidity sensors measurements in the bentonite buffer have been insignificant during the second half of the test period, indicating that the material was close to saturation. However in the upper section (Ring 9), the fact that the pore pressure started to equilibrate with the water pressure in the sand filter indicated that fill water saturation was reached in this part. This sand slot between the bentonite column and the surrounding rock has been used for artificial wetting. More than the water theoretically needed to fill up the sand slot and to saturate the bentonite has been injected, which proves that the system was not hydraulically closed but leaked towards the rock (EDZ). The high sand slot injection pressure required to maintain the inflow shows the weakness of the injection system (clogging of the filter tips). An unclogging action was therefore performed by injecting demineralised water instead of ground water, as it was done since the beginning of the experiment. This action proved successful, and after this modification it was possible to maintain a hydraulic pressure in the filter around 4 bar absolute. The decrease in total pressure and increase in suction that was recorded around the upper heater from day 225 to day 370 has been caused by

  3. Survey of U.S. Organ Procurement Organizations Regarding Pediatric Organ Donor Management.

    Science.gov (United States)

    Ream, Robert S; Armbrecht, Eric S

    2016-10-01

    To describe the current practice of pediatric organ donor management in the United States for donors declared dead based upon neurologic criteria. The study directs particular attention to how pediatric donors are defined, the use of donor management guidelines, the use of donor management goals, and the involvement of pediatric critical care or transplantation expertise. Cross-sectional observational study using a web-based survey and follow-up telephone interview with respondents from U.S. organ procurement organizations. The study also incorporated organ procurement organization-specific data on organ yield for the 4-year period (2010-2013) preceding the study. The 58 U.S. organ procurement organizations. Respondents chosen by each organ procurement organization. None. All 58 U.S. organ procurement organizations participated in the study. Fifty-two respondents (90%) indicated that their organ procurement organization distinguished pediatric from adult donors resulting in 28 unique pediatric definitions. Thirty-nine organ procurement organizations utilized some form of written pediatric management guidelines, and 27 (47%) maintained pediatric donor management goals; compliance was infrequently monitored for both guidelines (28%) and goals (33%). A pediatric intensivist was always or usually involved in pediatric donor management at 47 organ procurement organizations (81%); transplant/organ recovery surgeons were always or usually involved at 12 organ procurement organizations (21%). There was an increase in the number of organs transplanted per donor among donors 11-17 years old for organ procurement organizations that used donor management goals for the duration of the period studied (p procurement organizations that always or usually consulted a transplant/organ recovery surgeon (p = 0.02) although this did not reach our threshold for statistical significance.. There is little consensus among organ procurement organizations regarding the definition of

  4. THE IMPACT OF CENTRALIZATION, CORRUPTION AND INSTITUTIONAL QUALITY ON PROCUREMENT PRICES: AN APPLICATION TO PHARMACEUTICAL PURCHASING IN ITALY

    OpenAIRE

    Simona, Baldi; Davide, Vannoni

    2014-01-01

    This paper deals with the open issue about the choice between a centralized versus a decentralized public procurement strategy. Using a unique dataset on tender prices of selected drugs for hospital usage awarded by a sample of 52 Italian local health service providers (ASLs) between 2009 and 2012, we test which procurement system (centralized, decentralized or hybrid) performs better. Controlling for several covariates, we always find that centralized and hybrid procurers pay lower prices as...

  5. Procurement Options for New Renewable Electricity Supply

    Energy Technology Data Exchange (ETDEWEB)

    Kreycik, C. E.; Couture, T. D.; Cory, K. S.

    2011-12-01

    State renewable portfolio standard (RPS) policies require utilities and load-serving entities (LSEs) to procure renewable energy generation. Utility procurement options may be a function of state policy and regulatory preferences, and in some cases, may be dictated by legislative authority. Utilities and LSEs commonly use competitive solicitations or bilateral contracting to procure renewable energy supply to meet RPS mandates. However, policymakers and regulators in several states are beginning to explore the use of alternatives, namely feed-in tariffs (FITs) and auctions to procure renewable energy supply. This report evaluates four procurement strategies (competitive solicitations, bilateral contracting, FITs, and auctions) against four main criteria: (1) pricing; (2) complexity and efficiency of the procurement process; (3) impacts on developers access to markets; and (4) ability to complement utility decision-making processes. These criteria were chosen because they take into account the perspective of each group of stakeholders: ratepayers, regulators, utilities, investors, and developers.

  6. Ethics and regulation in organ procurement research.

    Science.gov (United States)

    Ackerman, Terrence F; Winsett, Rebecca P

    2002-12-01

    This article explores the role of ethics and regulation in human research conducted by organ procurement agencies; basic ethical principles for human research are outlined. Organ procurement agencies are not required to observe federal regulations; however, voluntary adherence will ensure that procurement research is conducted according to current standards of ethical practice. Although most organ procurement research will qualify for exempt status, this determination should be made by an institutional review board. Even if studies qualify for exempt status, there is a moral presumption that informed consent should be sought, unless certain narrow conditions for waiver of consent are satisfied. Finally, when future research utilizing organ procurement records is anticipated, procurement coordinators should provide sufficiently detailed information to families about such plans to permit their advance informed consent to research activities.

  7. Evolution in public procurement and the impact of e-procurement platforms: A case study

    OpenAIRE

    Leal, Pedro Manuel Mariano

    2010-01-01

    A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics The aim of this project is to understand the evolution that occurred in the public procurement due to the new Public Contracts Code that changed the procurement procedures and forced public entities to use electronic procurement platforms. This work is a contribution to the understanding of the main procurement changes with this ...

  8. Services procurement under the WTO’s agreement on government procurement: whither market access?

    OpenAIRE

    Shingal, Anirudh

    2010-01-01

    This paper studies the government procurement of services from foreign suppliers by conducting a statistical analysis of data submitted by Japan and Switzerland to the WTO's Committee on Government Procurement. Using several metrics, the paper examines if the WTO’s Agreement on Government Procurement (GPA) has led to greater market access for foreign suppliers in services procurement. Our results indicate that despite the GPA, the proportions of services contracts awarded to foreigners have d...

  9. Infrastructure procurement skills gap amongst procurement personnel in Nigeria’s public sector

    OpenAIRE

    Mahamadu, A.-M. ed; Manu, P.; Booth, C.; Olomolaiye, P.; Coker, A.; Ibrahim, A. ed; Lamond, J.

    2018-01-01

    Purpose - Procurement of public infrastructure that is fit for purpose partly depends on the competencies of procurement personnel. In many developing countries in Sub-Saharan Africa, including Nigeria, there is a deficit in the quantity and quality of infrastructure and their procurement is further riddled with deficiencies in the capacity of public procuring entities. It is, however, unclear from the extant literature, what are the critical skills development needs of public personnel invol...

  10. Information Technology Procurement Authorization (ITPA) Tracking System

    Data.gov (United States)

    Office of Personnel Management — Information Technology Procurement Authorization (ITPA) Tracking System is used for gathering consistent data from U.S. Office of Personnel Management (OPM) program...

  11. Contracting Out Government Procurement Functions: An Analysis

    National Research Council Canada - National Science Library

    Lamm, David; Yoder, Cory

    2008-01-01

    ...)), asked the Naval Postgraduate School (NPS) to analyze the contracting out of procurement functions currently being accomplished by Navy, Marine Corps, and other Department of Defense (DOD) Activities...

  12. The International Experience in Public Procurement

    Directory of Open Access Journals (Sweden)

    Pysmenna Mariia S.

    2017-11-01

    Full Text Available The article is aimed at generalizing the foreign experience of implementing public procurement, analyzing peculiarities of organizational, normative and procedural provision of public procurement in the Member States of the European Union. The relevance of the research topic is due to the need to harmonize the procurement policy of the Government of Ukraine with the international legal framework and with broad political objectives within the European integration strategy. The organizational framework and principles of implementing public procurement in the EU Member States were analyzed. Special attention was paid to normative provision of public procurement by the EU Member States; peculiarities of the use of national or harmonized rules of public procurement in accordance with the amount of the procurement contract; restrictions and conditions for public authorities in the selection of applicants for bidding. Five types of public procurement procedures used in the EU have been characterized, namely: open procedure, limited procedure, negotiation procedure, competitive dialog, electronic auctions. The need to address the social and legal aspects of public procurement in international practice has been substantiated and the possibilities for resolving these problems have been presented.

  13. Risk Management in Public Procurement Process

    Directory of Open Access Journals (Sweden)

    Ioana Manea

    2010-12-01

    Full Text Available Public procurement represents an important part of the current economy reality. Throughout the procurement process, due to the effect of the interaction among the components of the public procurement system, certain actions with significant negative effects on its optimal operation may occur. Risks may turn into certainty either because of a simple error in the development and administration of the procurement process, or because of a deliberate deviation from the existing legal provisions. Therefore, there is an imperative for the implementation of certain risk-avoiding measures, as well as of measures aiming to reduce their negative effects in case of their occurrence.

  14. Advances and Challenges in Islet Transplantation: Islet Procurement Rates and Lessons Learned from Suboptimal Islet Transplantation

    OpenAIRE

    Annette Plesner; C. Bruce Verchere

    2011-01-01

    The initial step in successful islet transplantation is procurement of healthy donor islets. Given the limited number of donor pancreata selected for islet isolation and that islets from multiple donors are typically required to obtain insulin independence, it is critical to improve pancreas procurement rates and yield of islets for transplantation. Islets are delicate microorgans that are susceptible to apoptosis, hypoxia, and ischemia during isolation, culture, and the peritransplant period...

  15. Factors affecting the government procurement fraud: The independent auditor’s point of view. Evidence from Indonesia

    Directory of Open Access Journals (Sweden)

    Zulaikha

    2016-11-01

    Full Text Available The objective of this study was examining the factors affecting the government procurement fraud. Based on the fraud triangle and the theory of planned behavior, this study proposed seven hypothesis, those are tested by regression analysis. This study used primary data gathered by surveys to members of The Boards of the Republic Indonesia- Financial Auditors, who act as external auditors for the Government. They were asked to assess factors influencing the government procurement of goods and services fraud. There were 297 auditors of the Boards that participated in this survey. The result showed that the procurement frauds were influenced by the lack of procurement committee quality, the weakness of procurement control, and the intentions to engage fraud. The intentions to engage fraud were significantly influenced by the attitude toward fraud, subjective norms, and the perceived behavioral control. Furthermore, other elements of fraud triangle, the financial pressure, did not influence to the procurement fraud.

  16. PUBLIC PROCUREMENT SYSTEM IN RUSSIA

    Directory of Open Access Journals (Sweden)

    Alla V. Trofimovskaya

    2013-01-01

    Full Text Available This article contains information on the theoretical-methodological research of the Institute of public procurement. The focus is on the consideration of the implementation of the priority tasks for the state contract system and the role in their solving that regional level of management can play. Opportunities in the sphere of state regulation, that Moscow, as the subject of the Federation, has, are educed in the article. The problem of transformation the existing contractual mechanisms for the formation of the model of public contract system, is studied.

  17. International overview of hospital procurement.

    Science.gov (United States)

    Ferrier, Maud; Lariviere, David; Laurent, Claire; Roque, Eric

    2011-01-01

    This article was written by four French hospital director students at the Ecole des Hautes Etudes en Santé Publique (EHESP-School of Public Health) from a study conducted jointly with students at the Grenoble School of Management to present an international overview of hospital procurement methods in ten countries. An analysis of these methods showed that there was a general trend towards group purchasing, with some common aims in terms of costs and performance and some differences in legislation (competition), size of the public sector and centralization or decentralization.

  18. Procurement of replacement pressure vessels for MURR

    International Nuclear Information System (INIS)

    Meyer, W.A. Jr.; Edwards, C.B. Jr.; McKibben, J.C.; Schoone, A.R.

    1989-01-01

    The University of Missouri Research Reactor Facility (MURR) located in Columbia, Missouri, is the highest powered, highest steady-state flux university research reactor in the United States. The reactor is a 10-MW pressurized loop, in-pool-type, light-water-moderated, beryllium-reflected, flux trap reactor. MURR has a compact core (0.033 m 3 ) composed of eight fuel elements of the materials test reactor type arranged as an annular right circular cylinder between the inner and outer aluminum pressure vessels. Conservative engineering judgment resulted in the decision in 1988 to purchase new inner and outer pressure vessels. This paper details the difficulties encountered in procuring replacements for aluminum pressure vessels built to standards that are no longer applicable in attempting to meet nuclear standards that are not applicable to nonferrous material

  19. Emergency Diesel Generation System Surveillance Test Policy Optimization Through Genetic Algorithms Using Non-Periodic Intervention Frequencies and Seasonal Constraints

    International Nuclear Information System (INIS)

    Lapa, Celso M.F.; Pereira, Claudio M.N.A.; Frutuoso e Melo, P.F.

    2002-01-01

    Nuclear standby safety systems must frequently, be submitted to periodic surveillance tests. The main reason is to detect, as soon as possible, the occurrence of unrevealed failure states. Such interventions may, however, affect the overall system availability due to component outages. Besides, as the components are demanded, deterioration by aging may occur, penalizing again the system performance. By these reasons, planning a good surveillance test policy implies in a trade-off between gains and overheads due to the surveillance test interventions. In order maximize the systems average availability during a given period of time, it has recently been developed a non-periodic surveillance test optimization methodology based on genetic algorithms (GA). The fact of allowing non-periodic tests turns the solution space much more flexible and schedules can be better adjusted, providing gains in the overall system average availability, when compared to those obtained by an optimized periodic tests scheme. The optimization problem becomes, however, more complex. Hence, the use of a powerful optimization technique, such as GAs, is required. Some particular features of certain systems can turn it advisable to introduce other specific constraints in the optimization problem. The Emergency Diesel Generation System (EDGS) of a Nuclear Power Plant (N-PP) is a good example for demonstrating the introduction of seasonal constraints in the optimization problem. This system is responsible for power supply during an external blackout. Therefore, it is desirable during periods of high blackout probability to maintain the system availability as high as possible. Previous applications have demonstrated the robustness and effectiveness of the methodology. However, no seasonal constraints have ever been imposed. This work aims at investigating the application of such methodology in the Angra-II Brazilian NPP EDGS surveillance test policy optimization, considering the blackout probability

  20. Bias magnetic field and test period dependences of direct and converse magnetoelectric hysteresis of tri-layered magnetoelectric composite

    Science.gov (United States)

    Zhou, Yun; Li, Xiao-Hong; Wang, Jian-Feng; Zhou, Hao-Miao; Cao, Dan; Jiao, Zhi-Wei; Xu, Long; Li, Qi-Hao

    2018-04-01

    The direct and converse magnetoelectric hysteresis behavior for a tri-layered composite has been comparatively investigated and significant similarities have been observed. The results show that both the direct and converse magnetoelectric hysteresis is deeply affected by the bias magnetic field and test period. The test time hysteresis caused by a fast varying bias magnetic field can be reduced by prolonging the test period. The observed coercive field, remanence, and ratio of remanence of the direct and converse magnetoelectric effects with the test period obey an exponential decay law. A hysteretic nonlinear magnetoelectric theoretical model for the symmetrical tri-layered structure has been proposed based on a nonlinear constitutive model and pinning effect. The numerical calculation shows that the theoretical results are in good agreement with the experimental results. These findings not only provide insight into the examination and practical applications of magnetoelectric materials, but also propose a theoretical frame for studying the hysteretic characteristics of the magnetoelectric effect.

  1. Monitoring of test gullies development from the Moldavian Tableland in 1986 - 2008 period

    Directory of Open Access Journals (Sweden)

    Maria RADOANE

    2009-01-01

    Full Text Available  In a study area in Romania covering about 25,000 km 2 over 9000 gullies were mapped. The areal distribution of the gullies indicated some areas where a higher density occurs. These areas are dominated by hillslope orientation towards the northwest and, respectively, the southeast, slope inclination between 20 to 30 m/100 m, slope length between 300 and 500 m and by a dominantly sandy lithology. Detailed field surveys were made of 17 gullies. Each gully was marked with a network of stakes to show the location of cross sections. The distances between cross sections were around 3-4 times the gully width.Topographical maps at scales of 1:200 to 1:500 were made for gully geomorphological surveys. In 2007-2008 we were interested in the evolution of the test gullies and if the evolution pattern we had proposed in 1999 was verified by the new measurements. In thiswork we will focus on the monitoring methods of the test gullies from our work database. Finally, we intend to present the calibrated pattern of the gully evolution. The distribution of gullies indicates that the highest gully density reflects hillslope orientation, inclination and length, and a sandy lithology. In Moldavia the average number ofgullies per kms is between 2 to 4, with a maximum of 20 gullies per kms; average density is between 0.1 to 1 km per kms, with a maximum length value of over 3 km per km. Gully number and density per surface unit are considered as classification criteria of gully erosion. The areas with the highest susceptibility of gully initiation in Moldavia are at the intersection of following factors: hillslope orientation towards NW and SE, respectively (hillslopes of consequent valleys, slope inclination between 20 to 30%, slope length between 300 and 500 m and a dominantly sandy lithology. These areas have a high density of points. Detailed investigations on 17 gullies sampled from the different areas of Moldaviabetween the Siret and Prut rivers in the

  2. University Procurement Officers’ Use of Technology When Seeking Information

    Directory of Open Access Journals (Sweden)

    Yahel Giat

    2016-05-01

    Full Text Available The transition from printed to electronic sources of information has resulted in a profound change to the way procurement officers seek information. Furthermore, in the past decade there have been additional technological revolutions that are expected to further affect the procurement process. In this paper, we conduct a survey among forty nine university procurement officers in Israel to examine to what extent procurement officers have adapted to smartphones and tablets by testing how frequently officers use notebooks, smartphones, and tablets for work-related and leisure purposes. We find that while officers prefer electronic sources of information over printed sources of information, officers have not yet adapted to the later technological advances (i.e., smartphones and tablets. Notebooks are more frequently used than either smartphones or tablets for work-related and leisure purposes. One explanation behind this result is that officers are not skilled in using smartphone and tablets applications. This implies that training officers in the use of these devices may improve their performance.

  3. 48 CFR 752.225-71 - Local procurement.

    Science.gov (United States)

    2010-10-01

    ... 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods... currency of the cooperating country. (b) All locally-financed procurements must be covered by source/origin...

  4. public procurement, governance and economic growth

    African Journals Online (AJOL)

    GRACE

    (2003: 2), ―strong procurement management in the public sector is a tool for achieving political, economic and social goals‖. Thus .... professionalism in the public sector procurement system (Section 4, PPA, 2007). The functions and powers of the ..... K., Bose, N. and Haque, M.E. (2004). Public Expenditures, Bureaucratic.

  5. 75 FR 47550 - Procurement List; Additions

    Science.gov (United States)

    2010-08-06

    ...--Macintosh Apple NSN: MR 473--Fresh Linen NPA: Industries for the Blind, Inc., West Allis, WI Contracting... Service, 5777 S. Aviation Blvd., N. Charleston, SC NPA: Goodwill Industries of Lower South Carolina, Inc... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be...

  6. 75 FR 22745 - Procurement List Additions

    Science.gov (United States)

    2010-04-30

    ... General Services Administration. Services Service Type/Location: Laundry Services, Alaska VA Healthcare... Procurement List. SUMMARY: This action adds to the Procurement List products and services to be furnished by... concerning capability of qualified nonprofit agencies to provide the products and services and impact of the...

  7. 76 FR 80345 - Procurement List; Additions

    Science.gov (United States)

    2011-12-23

    ... ARMY, W6QL ECC MIAMI DIV, MIAMI, FL. Service Type/Location: Industrial Laundry Service, Bureau of... Procurement List. SUMMARY: This action adds services to the Procurement List that will be provided by... concerning capability of qualified nonprofit agencies to provide the services and impact of the additions on...

  8. 78 FR 48656 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-08-09

    ... Oceanic and Atmospheric Administration, Boulder, CO. Service Type/Location: Laundry Service, US Coast... Additions to the Procurement List. SUMMARY: The Committee is proposing to add products and services to the... required to procure the products and services listed below from nonprofit agencies employing persons who...

  9. 77 FR 27736 - Procurement List Additions

    Science.gov (United States)

    2012-05-11

    ... Research Laboratory, Washington, DC. Service Type/Location: Laundry, Refurbishment, and Warehouse Services... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be... products and services and impact of the additions on the current or most recent contractors, the Committee...

  10. 77 FR 29596 - Procurement List Proposed Additions

    Science.gov (United States)

    2012-05-18

    .../Location: Laundry Service, Veterans Administration Medical Center (VAMC), (offsite: 1809 W 2nd Avenue... Additions to the Procurement List. SUMMARY: The Committee is proposing to add products and services to the... identified in this notice will be required to procure the products and services listed below from nonprofit...

  11. 75 FR 14576 - Procurement List Additions

    Science.gov (United States)

    2010-03-26

    ... Inspection Service, Minneapolis, MN. M.R. Laundry Products NSN: MR 1103--Heavy Duty Laundry Bag. NSN: MR 1104... procurement list. SUMMARY: This action adds to the Procurement List products and services to be furnished by... products and services and impact of the additions on the current or most recent contractors, the Committee...

  12. 22 CFR 226.44 - Procurement procedures.

    Science.gov (United States)

    2010-04-01

    ... Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.44 Procurement procedures. (a... and assistance, as appropriate, of such organizations as the Small Business Administration and the...

  13. Measuring the effect of Sustainable Public Procurement

    NARCIS (Netherlands)

    Zijp MC; Kok L; Valk E de; DMG; M&V; M&V

    2018-01-01

    Many purchasing services of the Dutch local and central governments, aim to include the effects of products and services on human health and the environment in the procurement process. Sustainable procurement (SP) encompasses more than just price and quality considerations. SP can result, for

  14. 42 CFR 457.940 - Procurement standards.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Procurement standards. 457.940 Section 457.940... Integrity § 457.940 Procurement standards. (a) A State must submit to CMS a written assurance that title XXI... public or private payment rates for comparable services for comparable populations, consistent with...

  15. International Research Study of Public Procurement

    NARCIS (Netherlands)

    Telgen, Jan; Harland, C.; Callender, G.; Harland, C.; Nassimbeni, G.; Schneller, E.

    2012-01-01

    In this chapter we examine the specific issue of public procurement, its importance to local, regional, national, and international economies as evidenced in a unique international comparative research study – the International Research Study of Public Procurement (IRSPP). First the public

  16. 7 CFR 210.21 - Procurement.

    Science.gov (United States)

    2010-01-01

    ... Responsibilities § 210.21 Procurement. (a) General. State agencies and school food authorities shall comply with... violation of law are to be referred to the local, State, or Federal authority that has proper jurisdiction... title are followed. A school food authority may use its own procurement procedures which reflect...

  17. 7 CFR 220.16 - Procurement standards.

    Science.gov (United States)

    2010-01-01

    ... nature. Matters concerning violation of law are to be referred to the local, State or Federal authority... § 3016.60(b) and (c) of this title are followed. The school food authority may use its own procurement procedures which reflect applicable State and local laws and regulations, provided that procurements made...

  18. 78 FR 45183 - Procurement List Additions

    Science.gov (United States)

    2013-07-26

    ... Requirement as aggregated by the General Services Administration. NSN: 7920-00-NIB-0564--Towel, Cleaning, Non... Procurement List. SUMMARY: This action adds a products and services to the Procurement List that will be... presented to it concerning capability of qualified nonprofit agencies to provide the products and services...

  19. How does procurement capability maturity affect e-Procurement adoption and leverage purchasing in supply chain

    Directory of Open Access Journals (Sweden)

    Pongpanga Pongsuwan

    2016-11-01

    Full Text Available This study refers to the research model of Batenburg (2008 which defined procurement functions to six maturity dimensions; strategy, processes, control, organization, information, e-Technology as the starting point and indicates twenty two items to support capability maturity measurement which is called “Procurement Competitive Capability Maturity”(PCCM. This model is used for a company to assess current practices of procurement function and perceives the level of its capabilities. The data collection is from a survey of fifty-two selected procurement organizations in Southeast Asia (SEA countries; from Thailand, Vietnam, Philippines, Indonesia, Malaysia and Singapore. The objective of this study is to demonstrate the significant value of industry type, size of spending and centralized/decentralized procurement that affect procurement capability maturity. The results show that the industry has no relation to the capability maturity; the size of procurement spend has a positive relation to the capability maturity; and the centralized procurement has higher capability maturity than the decentralized. Moreover, this study extends the knowledge of e-Procurement and digital context to leverage procurement processes and visible procurement integration in an organization and across the supply chain.

  20. Using An Adapter To Perform The Chalfant-Style Containment Vessel Periodic Maintenance Leak Rate Test

    International Nuclear Information System (INIS)

    Loftin, B.; Abramczyk, G.; Trapp, D.

    2011-01-01

    Recently the Packaging Technology and Pressurized Systems (PT and PS) organization at the Savannah River National Laboratory was asked to develop an adapter for performing the leak-rate test of a Chalfant-style containment vessel. The PT and PS organization collaborated with designers at the Department of Energy's Pantex Plant to develop the adapter currently in use for performing the leak-rate testing on the containment vessels. This paper will give the history of leak-rate testing of the Chalfant-style containment vessels, discuss the design concept for the adapter, give an overview of the design, and will present results of the testing done using the adapter.

  1. Measuring effects of public procurement of innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Underway for quite some time now has been the discussion on using public procurement as a means to stimulate innovation. However - with some exceptions this has been mainly a conceptual discussion vastly surpassed a corresponding development of appropriate monitoring tools. Also, even if both...... qualitative and quantitative studies have been made, they tend to lack connection to the underlying mechanisms envisaged in the conceptual and/or case based literature. A challenge in this endeavour prevails in the nature of how public procurement of innovation works. Some of the effects rendered may...... about the usefulness of public procurement of innovation are at all realistic and feasible in practice. After reviewing different currently available means to measure both public procurement of innovation measures, as well as public procurement of innovation, the paper outlines a case-based approach...

  2. Public Procurement of Innovation as Endogenous

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Public procurement used as an innovation policy instrument has attracted attention the last decade. It has been argued that public procurement can be used to stimulate innovation from the demand-side. This paper problematizes ‘demand’ understood as a problem defined by a public procurer given...... to potential suppliers to solve. By drawing on a cross-case analysis of two similar projects the paper attempts to explicate an understanding of the role of public procurement of innovation not primarily as a ‘demand-side innovation instrument’, as such thinking might run the risk of ignoring important...... underlying mechanisms critical for success. Instead the paper views public procurement of innovation as an instrument of endogenous- exogenous knowledge conversion....

  3. ONLINE PROCUREMENT IN SME`s

    Directory of Open Access Journals (Sweden)

    Daniela ICHIM

    2017-12-01

    Full Text Available E-Marketplaces are new business places for buying, selling products and services in many industries to support customers. The emergence of business-to-business (B2B in the online environment has opened up opportunities for effective online transactions between businesses. Research in this area is not enough to offer only fragmented perspectives in this area. Therefore, the targeted research problem was designed to investigate how business performance of online B2B purchases can be analyzed. The proposed study focuses on the online procurement in. Specifically, they try to answer questions such as: Does site, product, and vendor characteristics affect the online procurement in? Does online buying experience influence online procurement by? Participants are that use the Internet to procure products or services. Study respondents were SME managers who believe that online procurement will save time, money and effort, reducing costs.

  4. Decentralized Procurement in Light of Strategic Inventories

    DEFF Research Database (Denmark)

    Frimor, Hans; Arya, Anil; Mittendorf, Brian

    2015-01-01

    The centralization versus decentralization choice is perhaps the quintessential organizational structure decision. In the operations realm, this choice is particularly critical when it comes to the procurement function. Why firms may opt to decentralize procurement has been often studied and conf......The centralization versus decentralization choice is perhaps the quintessential organizational structure decision. In the operations realm, this choice is particularly critical when it comes to the procurement function. Why firms may opt to decentralize procurement has been often studied...... and confirmed to be a multifaceted choice. This paper complements existing studies by detailing the trade-offs in the centralization versus decentralization decision in light of firm's decision to cede procurement choices to its individual devisions can help moderate inventory levels and provide a natural salve...

  5. Time dependent unavailability analysis of nuclear safety systems considering periodically tested components

    International Nuclear Information System (INIS)

    Goes, Alexandre Gromann de Araujo

    1988-01-01

    It is of utmost importance to have a computer code in order to analyze how different parameters (like test duration time) affect the unavailability of safety systems of nuclear. In this context, a study was performed in order to evaluate the model employed by the FRANTIC computer code, which performs detailed calculations on the contribution to the system unavailability originated by hardware failures, component tests and repairs, aiming at considering the influence of different test schemes on the system unavailability. It was shown, by means of the results attained that the numerical model used by the FRANTIC code and the analytical model proposed by APOSTOLAKIS and CHU (4) give unavailability values much similar when the component tests are supposed to be perfect. When a test is supposed to be imperfect (that is, when it may induce a test is supposed to be imperfect (that is, when it may induce a failure on the component being tested), the analytical model presents more conservative results. (author)

  6. Human error considerations and annunciator effects in determining optimal test intervals for periodically inspected standby systems

    International Nuclear Information System (INIS)

    McWilliams, T.P.; Martz, H.F.

    1981-01-01

    This paper incorporates the effects of four types of human error in a model for determining the optimal time between periodic inspections which maximizes the steady state availability for standby safety systems. Such safety systems are characteristic of nuclear power plant operations. The system is modeled by means of an infinite state-space Markov chain. Purpose of the paper is to demonstrate techniques for computing steady-state availability A and the optimal periodic inspection interval tau* for the system. The model can be used to investigate the effects of human error probabilities on optimal availability, study the benefits of annunciating the standby-system, and to determine optimal inspection intervals. Several examples which are representative of nuclear power plant applications are presented

  7. Amphetamines and cannabinoids testing in hair: Evaluation of results from a two-year period.

    Science.gov (United States)

    Burgueño, María José; Alonso, Amaya; Sánchez, Sergio

    2016-08-01

    This paper presents an overview of a set of amphetamines and cannabinoids tests performed on head hair samples from the Medico-Legal sector at the Madrid Department of the Spanish National Institute of Toxicology and Forensic Sciences during the years 2013 and 2014. The hair samples were tested for five stimulant phenylalkylamine derivatives -amphetamine (AP), methamphetamine (MA), 3,4-methylenedioxymethamphetamine (MDMA), 3,4-methylenedioxy-amphetamine (MDA), and 3,4-methylenedioxy-N-ethylamphetamine (MDEA)- and/or two cannabinoids-Δ(9)-tetrahydrocannabinol (THC) and cannabinol (CBN)- by gas chromatography equipped with mass spectrometry detection in selected-ion monitoring mode, applying a method accredited to ISO/IEC 17025 standards. The test results were interpreted according to the confirmation cut-offs proposed by the Society of Hair Testing (SoHT) to identify chronic drug use. The ratios of positive results were studied in relation to gender, age, hair colour, dyeing and length of the tested samples to assess the independence from these variables or the association with them. Low, medium and high ranges of concentration were also estimated for each drug. 21.94% of the 2954 hair samples tested for phenylalkylamine derivatives were positive for one or more substances. 16.38% of the samples were positive for AP, 12.09% for MDMA and only 0.44% for MA. 6.60% of the tested samples were positive for AP/MDMA combination. A total of 3178 samples were tested for cannabinoids, resulting in 53.40% positive for THC and CBN. Simultaneous tests for phenylalkylamine derivatives and cannabinoids were performed in 2931 of the samples; 14.94% of them were positive for THC, CBN, and one or more amphetamines. According to the results from the statistical analysis, the use of THC and MDMA vary with age and gender among the Medico-Legal sector in an extended area of Spain, while the use of AP appears to be independent of these variables. On the other hand, the results of THC in

  8. Parents are interested in newborn genomic testing during the early postpartum period.

    Science.gov (United States)

    Waisbren, Susan E; Bäck, Danielle K; Liu, Christina; Kalia, Sarah S; Ringer, Steven A; Holm, Ingrid A; Green, Robert C

    2015-06-01

    We surveyed parents to ascertain interest in newborn genomic testing and determine whether these queries would provoke refusal of conventional state-mandated newborn screening. After a brief genetics orientation, parents rated their interest in receiving genomic testing for their healthy newborn on a 5-point Likert scale and answered questions about demographics and health history. We used logistic regression to explore factors associated with interest in genomic testing and tracked any subsequent rejection of newborn screening. We queried 514 parents within 48 hours after birth while still in hospital (mean age (SD) 32.7 (6.4) years, 65.2% female, 61.2% white, 79.3% married). Parents reported being not at all (6.4%), a little (10.9%), somewhat (36.6%), very (28.0%), or extremely (18.1%) interested in genomic testing for their newborns. None refused state-mandated newborn screening. Married participants and those with health concerns about their infant were less interested in newborn genomic testing (P = 0.012 and P = 0.030, respectively). Degree of interest for mothers and fathers was discordant (at least two categories different) for 24.4% of couples. Interest in newborn genomic testing was high among parents of healthy newborns, and the majority of couples had similar levels of interest. Surveying parents about genomic sequencing did not prompt rejection of newborn screening.Genet Med 17 6, 501-504.

  9. Optimized periodic verification testing blended risk and performance-based MOV inservice test program an application of ASME code case OMN-1

    Energy Technology Data Exchange (ETDEWEB)

    Sellers, C.; Fleming, K.; Bidwell, D.; Forbes, P. [and others

    1996-12-01

    This paper presents an application of ASME Code Case OMN-1 to the GL 89-10 Program at the South Texas Project Electric Generating Station (STPEGS). Code Case OMN-1 provides guidance for a performance-based MOV inservice test program that can be used for periodic verification testing and allows consideration of risk insights. Blended probabilistic and deterministic evaluation techniques were used to establish inservice test strategies including both test methods and test frequency. Described in the paper are the methods and criteria for establishing MOV safety significance based on the STPEGS probabilistic safety assessment, deterministic considerations of MOV performance characteristics and performance margins, the expert panel evaluation process, and the development of inservice test strategies. Test strategies include a mix of dynamic and static testing as well as MOV exercising.

  10. Optimized periodic verification testing blended risk and performance-based MOV inservice test program an application of ASME code case OMN-1

    International Nuclear Information System (INIS)

    Sellers, C.; Fleming, K.; Bidwell, D.; Forbes, P.

    1996-01-01

    This paper presents an application of ASME Code Case OMN-1 to the GL 89-10 Program at the South Texas Project Electric Generating Station (STPEGS). Code Case OMN-1 provides guidance for a performance-based MOV inservice test program that can be used for periodic verification testing and allows consideration of risk insights. Blended probabilistic and deterministic evaluation techniques were used to establish inservice test strategies including both test methods and test frequency. Described in the paper are the methods and criteria for establishing MOV safety significance based on the STPEGS probabilistic safety assessment, deterministic considerations of MOV performance characteristics and performance margins, the expert panel evaluation process, and the development of inservice test strategies. Test strategies include a mix of dynamic and static testing as well as MOV exercising

  11. Framework for Structuring Procurement Contracts

    Directory of Open Access Journals (Sweden)

    Lena Borg

    2014-12-01

    Full Text Available The aim of this paper is to propose a new framework for structuring contract types and payment methods. Concerning procurement contracts, the first important new feature of this framework is a stepwise structure with three main steps in the contract design: (1 what will be procured—should the contract only include construction, or should it include both construction and operation/maintenance (2 who will do the detailed design of the premise and (3 how many contractors will the client use? The second important new feature of this framework is that both step 2 and step 3 include a continuum of alternatives. Concerning payment methods, the new framework is primarily based on how the specific risks of the project are shared. These frameworks can be useful for policy formulation in that they can help to avoid some problematic ways of formulating policies.

  12. Traditional Procurement is too Slow

    Directory of Open Access Journals (Sweden)

    Ann Kong

    2012-11-01

    Full Text Available This paper reports on an exploratory interview survey of construction project participants aimed at identifying the reasons for the decrease in use of the traditional, lump-sum, procurement system in Malaysia. The results show that most people believe it is too slow. This appears to be in part due to the contiguous nature of the various phase and stages of the process and especially the separation of the design and construction phases. The delays caused by disputes between the various parties are also seen as a contributory factor - the most prominent cause being the frequency of variations, with design and scope changes being a particular source of discontent. It is concluded that an up scaling of the whole of the time related reward/penalty system may be the most appropriate measure for the practice in future.

  13. Nuclear electronic equipment for control and monitoring boards. Specifications and test methods of direct current period meters

    International Nuclear Information System (INIS)

    Roquefort, Henri; Chapelot; Ramard; Tardif; Tournier; Vaux

    1973-11-01

    After a few words of introduction, mention of the main notations used and the definition of certain terms, the field of application of the document is outlined and a list of references given. The main specifications of electronic 'direct current period meter' subassemblies for the monitoring, control and safety of nuclear reactors are then defined and the corresponding test methods described. The apparatus measures on a logarithmic scale the neutron fluence rate of a reactor by means of an ionisation chamber and supplies 'period' data relative to the fluence rate variation in time. The specifications and test methods are given for the different components: logarithmic amplifier, time derivative unit, threshold releases, high tension supply for ionisation chamber, auxiliary circuits and finally the complete period meter. (author) [fr

  14. 78 FR 5430 - Extension of Approval Period for Certain Tests Used in the National Reporting System for Adult...

    Science.gov (United States)

    2013-01-25

    ... DEPARTMENT OF EDUCATION Extension of Approval Period for Certain Tests Used in the National Reporting System for Adult Education AGENCY: Office of Vocational and Adult Education, Department of... National Reporting System for Adult Education (NRS regulations) (73 FR 2306). The NRS regulations...

  15. Test procedures to detect a loss of material in a sequence of balance periods

    International Nuclear Information System (INIS)

    Avenhaus, R.; Beedgen, R.; Sellinschegg, D.

    1985-06-01

    A workshop on Near-Real-Time Accountancy (NRTA) was held in KfK which came to a preliminary end in December 1982. In the framework of this workshop a number of sequential statistical test procedures were proposed which can be used in the case of a NRTA based safeguards regime. In the report the most promising test procedures are investigated. The analysis is based on the chemical separation process of a large model reprocessing facility with a throughput or 1000 tonnes per year. (orig.) [de

  16. 49 CFR 180.605 - Requirements for periodic testing, inspection and repair of portable tanks.

    Science.gov (United States)

    2010-10-01

    ... surface of all joints under pressure must be coated with or immersed in a solution of soap and water... test markings. (1) Each IM or UN portable tank must be durably and legibly marked, in English, with the...) Each Specification DOT 51, 56, 57 or 60 portable tank must be durably and legibly marked, in English...

  17. Mechanical properties test data for structural materials. Quarterly progress report for period ending October 31, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Hill, M R [comp.

    1976-12-01

    Test data on heat resisting reactor materials are presented. These data were obtained in research at EG and G Idaho, Argonne National Laboratory, Oak Ridge National Laboratory, Naval Research Laboratory, Hanford Engineering Development Laboratory, Westinghouse Advanced Reactors Division, General Electric Company, University of Cincinnati, and University of California at Los Angeles. (JRD)

  18. Dynamic pressure probe response tests for robust measurements in periodic flows close to probe resonating frequency

    Science.gov (United States)

    Ceyhun Şahin, Fatma; Schiffmann, Jürg

    2018-02-01

    A single-hole probe was designed to measure steady and periodic flows with high fluctuation amplitudes and with minimal flow intrusion. Because of its high aspect ratio, estimations showed that the probe resonates at a frequency two orders of magnitude lower than the fast response sensor cut-off frequencies. The high fluctuation amplitudes cause a non-linear behavior of the probe and available models are neither adequate for a quantitative estimation of the resonating frequencies nor for predicting the system damping. Instead, a non-linear data correction procedure based on individual transfer functions defined for each harmonic contribution is introduced for pneumatic probes that allows to extend their operating range beyond the resonating frequencies and linear dynamics. This data correction procedure was assessed on a miniature single-hole probe of 0.35 mm inner diameter which was designed to measure flow speed and direction. For the reliable use of such a probe in periodic flows, its frequency response was reproduced with a siren disk, which allows exciting the probe up to 10 kHz with peak-to-peak amplitudes ranging between 20%-170% of the absolute mean pressure. The effect of the probe interior design on the phase lag and amplitude distortion in periodic flow measurements was investigated on probes with similar inner diameters and different lengths or similar aspect ratios (L/D) and different total interior volumes. The results suggest that while the tube length consistently sets the resonance frequency, the internal total volume affects the non-linear dynamic response in terms of varying gain functions. A detailed analysis of the introduced calibration methodology shows that the goodness of the reconstructed data compared to the reference data is above 75% for fundamental frequencies up to twice the probe resonance frequency. The results clearly suggest that the introduced procedure is adequate to capture non-linear pneumatic probe dynamics and to

  19. Phase I Project: Fiber Optic Distributed Acoustic Sensing for Periodic Hydraulic Tests

    Energy Technology Data Exchange (ETDEWEB)

    Becker, Matthew

    2017-12-31

    The extraction of heat from hot rock requires circulation of fluid through fracture networks. Because the geometry and connectivity of these fractures determines the efficiency of fluid circulation, many tools are used to characterize fractures before and after development of the reservoir. Under this project, a new tool was developed that allows hydraulic connectivity between geothermal boreholes to be identified. Nanostrain in rock fractures is measured using fiber optic distributed acoustic sensing (DAS). This strain is measured in one borehole in response to periodic pressure pulses induced in another borehole. The strain in the fractures represents hydraulic connectivity between wells. DAS is typically used at frequencies of Hz to kHz, but strain at mHz frequencies were measured for this project. The tool was demonstrated in the laboratory and in the field. In the laboratory, strain in fiber optic cables was measured in response to compression due to oscillating fluid pressure. DAS recorded strains as small as 10 picometer/m in response to 1 cm of water level change. At a fractured crystalline rock field site, strain was measured in boreholes. Fiber-optic cable was mechanically coupled borehole walls using pressured flexible liners. In one borehole 30 m from the oscillating pumping source, pressure and strain were measured simultaneously. The DAS system measured fracture displacement at frequencies of less than 1 mHz (18 min periods) and amplitudes of less than 1 nm, in response to fluid pressure changes of less 20 Pa (2 mm of water). The attenuation and phase shift of the monitored strain signal is indicative of the permeability and storage (compliance) of the fracture network that connects the two wells. The strain response as a function of oscillation frequency is characteristic of the hydraulic structure of the formation. This is the first application of DAS to the measurement of low frequency strain in boreholes. It has enormous potential for monitoring

  20. Frequency response testing at Experimental Breeder Reactor II using discrete-level periodic signals

    International Nuclear Information System (INIS)

    Rhodes, W.D.; Larson, H.A.

    1990-01-01

    The Experimental Breeder Reactor 2 (EBR-2) reactivity-to-power frequency-response function was measured with pseudo-random, discrete-level, periodic signals. The reactor power deviation was small with insignificant perturbation of normal operation and in-place irradiation experiments. Comparison of results with measured rod oscillator data and with theoretical predictions show good agreement. Moreover, measures of input signal quality (autocorrelation function and energy spectra) confirm the ability to enable this type of frequency response determination at EBR-2. Measurements were made with the pseudo-random binary sequence, quadratic residue binary sequence, pseudo-random ternary sequence, and the multifrequency binary sequence. 10 refs., 7 figs., 3 tabs

  1. Attachment and parental divorce: a test of the diffusion and sensitive period hypotheses.

    Science.gov (United States)

    Fraley, R Chris; Heffernan, Marie E

    2013-09-01

    One of the assumptions of attachment theory is that disruptions in parental relationships are prospectively related to insecure attachment patterns in adulthood. The majority of research that has evaluated this hypothesis, however, has been based on retrospective reports of the quality of relationships with parents-research that is subject to retrospective biases. In the present research, the authors examined the impact of parental divorce-an event that can be assessed relatively objectively-on attachment patterns in adulthood across two samples. The data indicate that parental divorce has selective rather than diffuse implications for insecure attachment. Namely, parental divorce was more strongly related to insecure relationships with parents in adulthood than insecure relationships with romantic partners or friends. In addition, parental insecurity was most pronounced when parental divorce took place in early childhood. This finding is consistent with hypotheses about sensitive periods in attachment development.

  2. A cross-sectional survey of the models in Bihar and Tamil Nadu, India for pooled procurement of medicines.

    Science.gov (United States)

    Chokshi, Maulik; Farooqui, Habib Hasan; Selvaraj, Sakthivel; Kumar, Preeti

    2015-01-01

    In India, access to medicine in the public sector is significantly affected by the efficiency of the drug procurement system and allied processes and policies. This study was conducted in two socioeconomically different states: Bihar and Tamil Nadu. Both have a pooled procurement system for drugs but follow different models. In Bihar, the volumes of medicines required are pooled at the state level and rate contracted (an open tender process invites bidders to quote for the lowest rate for the list of medicines), while actual invoicing and payment are done at district level. In Tamil Nadu, medicine quantities are also pooled at state level but payments are also processed at state level upon receipt of laboratory quality-assurance reports on the medicines. In this cross-sectional survey, a range of financial and non-financial data related to procurement and distribution of medicine, such as budget documents, annual reports, tender documents, details of orders issued, passbook details and policy and guidelines for procurement were analysed. In addition, a so-called ABC analysis of the procurement data was done to to identify high-value medicines. It was observed that Tamil Nadu had suppliers for 100% of the drugs on their procurement list at the end of the procurement processes in 2006, 2007 and 2008, whereas Bihar's procurement agency was only able to get suppliers for 56%, 59% and 38% of drugs during the same period. Further, it was observed that Bihar's system was fuelling irrational procurement; for example, fluconazole (antifungal) alone was consuming 23.4% of the state's drug budget and was being procured by around 34% of the districts during 2008-2009. Also, the ratios of procurement prices for Bihar compared with Tamil Nadu were in the range of 1.01 to 22.50. For 50% of the analysed drugs, the price ratio was more than 2, that is, Bihar's procurement system was procuring the same medicines at more than twice the prices paid by Tamil Nadu. Centralized

  3. Assessment of nuclear tests consequences for biota and population health for period after the test site shutting down

    International Nuclear Information System (INIS)

    Bigaliev, A.B.

    2001-01-01

    In 1993 by the 'Nevada-Semej' International Anti-Nuclear Movement the Scientific Committee 'Radiation, Ecology, Heath' was created by the initiative of thr movement Leader - O.O.Sulejnenov. The committee jointed the energies of scientists - biologists, radio-biologists, physicians, radiologists, physicists and other specialists. In the Scientific Committee the Expert Councils for conducting the independent assessment of radiation influence on the natural environment and population health have been organized. The scientists and specialists have been took part in data systematization on radiation situation, dose loads on the Semipalatinsk test site population on the base of archival materials analysis, published papers and own data of studies. One may note, that currently the ecological map of site territory radiation contamination was developed,But these data are evaluative only and its demand clarification

  4. Studies of effects of closed microbial ecology. Report of 180-day test period

    Science.gov (United States)

    Kenyon, A. J.

    1972-01-01

    Experiments were performed to determine the influence closed microbial ecologies have on modification or simplification of natural intestinal flora of ferrets in a closed environmental system. On the basis of previous tests in which certain species (Salmonella and Bacteroides) were decreased at 90 days of enclosure, a second trial was constructed for 180-day tests. In this trial there was little difference in the 8 major classes of intestinal flora between animals in the Open and Closed environmental groups except for the level of Lactobacillus. It is of extreme importance to note that when both Open and Closed groups contracted hemorrhagic gastritis, the interrelationship of this agent with other intestinal flora produced a more profound effect on animals from the Closed Group, particularly with reference to Lactobacillus levels.

  5. Mexico - The Federal Procurement System : Challenges and Opportunities

    OpenAIRE

    World Bank

    2007-01-01

    The World Bank carried out the first country procurement assessment review (CPAR) jointly with the Government in 2001, focusing on the features and performance of the federal procurement system. Based on the action plan included in the 2001 CPAR, the government reformed federal procurement laws and regulations in 2005 and furthered the development of Government Procurement Electronic Syste...

  6. 75 FR 49481 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2010-08-13

    ... added to the Procurement List: Services Service Type/Locations: Laundry Service, Atlanta VA Medical...: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities and deletes a service from the Procurement List previously furnished by such agency. DATES...

  7. 78 FR 21916 - Procurement List; Addition And Deletions

    Science.gov (United States)

    2013-04-12

    ..., the following service is added to the Procurement List: Service Service Type/Location: Laundry Service...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...

  8. 22 CFR 201.23 - Procurement under private sector procedures.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement under private sector procedures... § 201.23 Procurement under private sector procedures. (a) General requirements. Procurements under private sector procedures will normally be carried out by importers using negotiated procurement...

  9. Evaluation of football players’ power during a maturation period by use the RAST test

    Directory of Open Access Journals (Sweden)

    Adrian Sieroń

    2017-07-01

    Full Text Available Abstract          Introduction: Properly planned and implemented training cycle should influence the development      of motor skills, responsible for anaerobic work. The ability to quickly achieve and maintain high power is crucial to the final success of football (Stankiewicz               i Cieślicka, 2013. Performing     a specific test several Times, during preparation for the league games, gives the coaches and instructors of the sport the ability to dispense appropriate training loads, before the start and during the game. Moreover, they can freely watching the progress of the pupil. An athlete who, under intense effort, will reach high speeds with a low power loss, will achieve a high level of tolerance to fatigue. The ability to rapidly speed up and to multiple repetition of this activity, is now the basic requirement of most sports, such as football, basketball, handball, athletics, tennis and more.          The aim of the study is to assess the power of football players of different ages with the RAST test. In addition, relative power will be tested with reference to the body weight of the subjects.         Conclusion: By analyzing the study population, it can be concluded that body mass is significantly dominant in the group of high school students, which undoubtedly influences their ability to gain more power. Furthermore, taking into account the results of the relativized power, it has to be stated, that after weight loss relative power is also significantly dominant in high school students, which is evidence for their more advanced biological development and the impact of football training on the obtained results.

  10. Critical test of isotropic periodic sum techniques with group-based cut-off schemes.

    Science.gov (United States)

    Nozawa, Takuma; Yasuoka, Kenji; Takahashi, Kazuaki Z

    2018-03-08

    Truncation is still chosen for many long-range intermolecular interaction calculations to efficiently compute free-boundary systems, macromolecular systems and net-charge molecular systems, for example. Advanced truncation methods have been developed for long-range intermolecular interactions. Every truncation method can be implemented as one of two basic cut-off schemes, namely either an atom-based or a group-based cut-off scheme. The former computes interactions of "atoms" inside the cut-off radius, whereas the latter computes interactions of "molecules" inside the cut-off radius. In this work, the effect of group-based cut-off is investigated for isotropic periodic sum (IPS) techniques, which are promising cut-off treatments to attain advanced accuracy for many types of molecular system. The effect of group-based cut-off is clearly different from that of atom-based cut-off, and severe artefacts are observed in some cases. However, no severe discrepancy from the Ewald sum is observed with the extended IPS techniques.

  11. Donor conversion and procurement failure: the fate of our potential organ donors.

    Science.gov (United States)

    Branco, Bernardino C; Inaba, Kenji; Lam, Lydia; Salim, Ali; Barmparas, Galinos; Teixeira, Pedro G R; Talving, Peep; Demetriades, Demetrios

    2011-02-01

    Donor availability remains the primary limiting factor for organ transplantation today. The purpose of this study was to examine the causes of procurement failure amongst potential organ donors. After Institutional Review Board approval, all surgical intensive care unit (SICU) patients admitted to the LAC+USC Medical Center from 01/2006 to 12/2008 who became potential organ donors were identified. Demographics, clinical data, and procurement data were abstracted. In non-donors, the causes of procurement failure were documented. During the 3-year study period, a total of 254 patients were evaluated for organ donation. Mean age was 44.8±18.7 years; 191 (75.2%) were male, 136 (53.5%) were Hispanic, and 148 (58.3%) were trauma patients. Of the 254 patients, 116 (45.7%) were not eligible for donation: 34 had multi-system organ failure, 24 did not progress to brain death and had support withdrawn, 18 had uncontrolled sepsis, 15 had malignancy, 6 had human immunodeficiency virus or hepatitis B or C, and 19 patients had other contraindications to organ donation. Of the remaining 138 eligible patients, 83 (60.2%) did not donate: 56 because the family denied consent, 9 by their own choice. In six, next of kin could not be located, five died because of hemodynamic instability before organ procurement was possible, four had organs that could not be placed, and three had their organs declined by the organ procurement organization. The overall consent rate was 57.5% (n=67). From the 55 donors, 255 organs were procured (yield 4.6 organs/donor). Of all patients screened for organ donation, only a fifth actually donated. Denial of consent was the major potentially preventable cause of procurement failure, whereas hemodynamic instability accounted for only a small percentage of donor losses. With such low conversion rates, the preventable causes of procurement failure warrant further study.

  12. Exploring the relationship between planning and procurement in Western U.S. electric utilities

    Energy Technology Data Exchange (ETDEWEB)

    Carvallo Bodelon, Juan Pablo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Division; Sanstad, Alan H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Division; Larsen, Peter H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Division

    2017-06-01

    Integrated resource planning (IRP) is an important regulatory process used in many U.S. states to formulate and evaluate least-cost and risk-assessed portfolios to meet future load requirements for electric utilities. In principle, effective implementation of IRP seeks to assure regulators and the public that utility investment decisions, given uncertainty, are as cost-effective as possible. However, to date, there is no empirical assessment on the effectiveness of IRP implementation. In this analysis, we compare planning, procurement processes and actual decisions for a sample of twelve load serving entities (LSEs) across the Western U. S. from 2003-2014. The 2008/2009 recession provides a unique “stress test” to the planning process and offers an excellent opportunity to trace how procurement decisions responded to this largely unforeseen event. In aggregate, there is a general alignment between planned and procured supply-side capacity. However, there are significant differences in the choice of supply-side resources and type of ownership for individual LSEs. We develop case studies for three LSEs and find that subsequent plans differ significantly due to changes in the planning environment and that procurement decisions in some cases are impacted by factors that are not accounted for in the planning process. Our results reveal that a limited amount of information produced during the long-term planning process (e.g., forecasts, methods, and least cost/risk portfolios) are ultimately used during the procurement process, and that the latter process relies extensively on the most recent information available for decision making. These findings suggest that states' IRP rules and regulations mandating long-term planning horizons with the same analytical complexity throughout the planning period may not create useful information for the procurement process. The social value of a long-term planning process that departs from procurement and the balance between

  13. 40 CFR 30.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... competition when competitive bids or offers are not obtained; and basis for award cost or price. ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 30.46...

  14. 14 CFR 1260.146 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ... Higher Education, Hospitals, and Other Non-Profit Organizations Procurement Standards § 1260.146... of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...

  15. 32 CFR 32.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 32.46... for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...

  16. 36 CFR 1210.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards...) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...

  17. 22 CFR 145.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145... for lack of competition when competitive bids or offers are not obtained, and (c) basis for award cost or price. ...

  18. 2 CFR 215.46 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ... NON-PROFIT ORGANIZATIONS (OMB CIRCULAR A-110) Post Award Requirements Procurement Standards § 215.46... of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...

  19. 24 CFR 84.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84... for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...

  20. 7 CFR 3019.46 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ...) Justification for lack of competition bids or offers are not obtained, and (c) Basis for award cost or price. ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement...

  1. 78 FR 38953 - Procurement List Additions

    Science.gov (United States)

    2013-06-28

    ... Blind or Severely Disabled published notices of proposed additions to the Procurement List. After... Punch, Paper, Desktop, 3-Hole, Adjustable, 11 sheet capacity, Metallic Base, Black Grip. Coverage: A...

  2. 78 FR 12295 - Procurement List; Additions

    Science.gov (United States)

    2013-02-22

    ... published notices of proposed additions to the Procurement List. After consideration of the material..., 508 Compliant, 12 Digit, Portable, Desktop, Battery Operated NPA: MidWest Enterprises for the Blind...

  3. Standard Procurement System Use and User Satisfaction

    National Research Council Canada - National Science Library

    2001-01-01

    The audit was performed in response to concerns expressed by the Chairman, House of Representatives Committee on Budget that DoD was not effectively spending Federal funds to acquire the Standard Procurement System (SPS...

  4. Federal Procurement Data System - FPDS API

    Data.gov (United States)

    General Services Administration — The Federal Procurement Data System (FPDS) Next Generation has been re-engineered as a real-time federal enterprise information system. Web services based on SOAP...

  5. Assessment of procurement methods used for executing ...

    African Journals Online (AJOL)

    Assessment of procurement methods used for executing maintenance works in Lagos state. ... Ethiopian Journal of Environmental Studies and Management ... Others are risk allocation, price competition and flexibility of contract. Finally, better ...

  6. 78 FR 40727 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-07-08

    ... for addition to the Procurement List for production by the nonprofit agencies listed: Products Towel.... 12/BX Cleaner, Brake Parts NSN: 6850-01-167-0678--17 oz. NPA: The Lighthouse for the Blind, St. Louis...

  7. 78 FR 35874 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-06-14

    ... proposed for addition to the Procurement List for production by the nonprofit agencies listed: Products... Cleaner NPA: Winston-Salem Industries for the Blind, Inc., Winston-Salem, NC Contracting Activity: Defense...

  8. Industry Analysis for Body Armor Procurement

    National Research Council Canada - National Science Library

    Foust, Coleen; Jenson, Christopher

    2006-01-01

    .... In addition, the Office of Management and Budget has required that each agency create strategic sourcing initiatives, monitor the cost savings and report the results to the Office of Federal Procurement Policy...

  9. Turning the Kaleidoscope: Five Perspectives on Procurement

    DEFF Research Database (Denmark)

    Munkgaard Møller, Morten; Vammen, Søren

    Purpose of this paper The purpose of the paper is to provide a conceptual foundation to enhance the body of knowledge related to procurement and sourcing through a framework consisting of five perspectives. The perspectives are: (1) Strategic, (2) Organizational, (3) Capability, (4) Supplier......, and a (5) Customer Perspectives. The aim is to develop a holistic perspective of procurement by applying these five essential, but very different perspectives in order to achieve a holistic picture of the function. Design/methodology/approach The foundation is derived from various well-established theories...... within the five perspectives. Specifically, procurement was viewed from the perspective of organizational theory, network theory, resource/knowledge based views of the firm, transaction cost theory and various theories within the strategic field of research Findings By viewing procurement through...

  10. ASSESSMENT OF PROCUREMENT METHODS USED FOR ...

    African Journals Online (AJOL)

    Osondu

    2012-10-08

    Oct 8, 2012 ... client/or representatives so as to arrive at a tender figure and other ... client have a great influence on maintenance procurement. ... satisfaction and project success and the ... Construction Industries, and Hotels) top the list.

  11. Government Procurement Agreements and Telecommunications Business

    Directory of Open Access Journals (Sweden)

    Shin-Won Kang

    2001-12-01

    Full Text Available The opening of the telecommunications market is acceleration due to the world trends of deregulation and privatization under the WTO basic telecommunications agreements. Diversification of services and fast and efficient equipment procurement are becoming necessary conditions for the survival of telecommunications operators. However, the issue here is that telecommunications operators are still bound by the GPA (Government Procurement Agreement based on conditions of monopoly even though the procurement market in Korean is open substantially since 1997. Under such conditions, the continued application of the GPA on telecommunications operator who is highly competitive may result in a negative impact on the telecommunications business and quality of telecommunications service by undermining the autonomy of operator and decreasing operator’s procurement competitiveness. Therefore, this study examines the GPA and the issues raised by the agreement, and also attempts to suggest revisions or means of abrogating the unfair GPA with regards to the development and deregulation of the telecommunications business.

  12. The World Bank Group and Public Procurement--An Independent Evaluation : Volume 1. Building Procurement Capacity and Systems

    OpenAIRE

    Independent Evaluation Group

    2014-01-01

    Good public procurement practices are a major determinant of the effectiveness of public expenditure. On behalf of their citizens, governments typically spend as much as 5-20 percent of their gross domestic product on procurement of goods and services, and effective procurement policies enable better use of government budgets. Good national procurement practices are therefore an essential ...

  13. Utility procurement policies in the USA

    International Nuclear Information System (INIS)

    Lurf, G.; Nikazmerad, N.M.

    1983-01-01

    The subject is discussed under the headings: introduction; market history (historical uranium demand and production in the USA); recent long-term contract activity (expected US reactor demand and uranium production; expected US reactor demand and contracted uranium supplies); utility procurement attitudes; impact of inventories on procurement; current regulatory environment (spot-market price vs average long-term contract price); embargo and imports; conclusion. (U.K.)

  14. Factors influencing global antiretroviral procurement prices.

    Science.gov (United States)

    Wirtz, Veronika J; Forsythe, Steven; Valencia-Mendoza, Atanacio; Bautista-Arredondo, Sergio

    2009-11-18

    Antiretroviral medicines (ARVs) are one of the most costly parts of HIV/AIDS treatment. Many countries are struggling to provide universal access to ARVs for all people living with HIV and AIDS. Although substantial price reductions of ARVs have occurred, especially between 2002 and 2008, achieving sustainable access for the next several decades remains a major challenge for most low- and middle-income countries. The objectives of the present study were twofold: first, to analyze global ARV prices between 2005 and 2008 and associated factors, particularly procurement methods and key donor policies on ARV procurement efficiency; second, to discuss the options of procurement processes and policies that should be considered when implementing or reforming access to ARV programs. An ARV-medicines price-analysis was carried out using the Global Price Reporting Mechanism from the World Health Organization. For a selection of 12 ARVs, global median prices and price variation were calculated. Linear regression models for each ARV were used to identify factors that were associated with lower procurement prices. Logistic regression models were used to identify the characteristics of those countries which procure below the highest and lowest direct manufactured costs. Three key factors appear to have an influence on a country's ARV prices: (a) whether the product is generic or not; (b) the socioeconomic status of the country; (c) whether the country is a member of the Clinton HIV/AIDS Initiative. Factors which did not influence procurement below the highest direct manufactured costs were HIV prevalence, procurement volume, whether the country belongs to the least developed countries or a focus country of the United States President's Emergency Plan For AIDS Relief. One of the principal mechanisms that can help to lower prices for ARV over the next several decades is increasing procurement efficiency. Benchmarking prices could be one useful tool to achieve this.

  15. Best Value Procurement - The Practical Approach

    OpenAIRE

    Storteboom, Arnoud

    2017-01-01

    Traditional procurement methods leave much room for improving risk management and value creation. However, Best Value Procurement (BVP) is designed to increase project value by mitigating risks and increasing the transparency by underscoring the pre-award phase. This shift in paradigm is reached by following a sequence of elements with the principles of transparency, performance information measuring and contractor clarification. The BVP philosophy is developed in the USA. Following is ...

  16. Empirical Analysis of Competition in Procurement Auctions

    OpenAIRE

    Tukiainen, Janne

    2008-01-01

    A vast amount of public services and goods are contracted through procurement auctions. Therefore it is very important to design these auctions in an optimal way. Typically, we are interested in two different objectives. The first objective is efficiency. Efficiency means that the contract is awarded to the bidder that values it the most, which in the procurement setting means the bidder that has the lowest cost of providing a service with a given quality. The second objective is to maximize ...

  17. Multidimensional procurement auctions with unknown weights

    DEFF Research Database (Denmark)

    Greve, Thomas

    This paper studies the consequences of holding a procurement auction when the principal chooses not to show its preferences. My paper extends the procurement auction model of Che (1993) to a situation where both the principal and the agents have private information. Thus, unknown parameters of bo...... gives rise to an analysis of a principal that can not fully commit to the outcome induced by the scoring rule. Therefore, my result apply to contract theory and it’s problems with imperfect commitment....

  18. International public procurement: From scant facts to hard data

    OpenAIRE

    Cernat, Lucian; Kutlina-Dimitrova, Zornitsa

    2015-01-01

    Public procurement is a negotiating area gaining in importance at multilateral and bilateral level, as evidenced by a brief review of procurement provisions in existing trade agreements. The size of procurement spending stands in most developed economies at double-digit percentage points of GDP. However, despite the size and importance of these markets, the factual information available to trade negotiators remains scarce. Although public procurement patterns (e.g. size of procurement markets...

  19. What Is the Status of Indonesian E-Procurement?

    OpenAIRE

    Achmad Nurmandi

    2013-01-01

    E-procurement is an important intrument to prevent corruption in goods and services procurement budget. Indonesia has been implementing the e-procurement project since 2008 based on Presidential Decree. President has stipulating annual order (presidential instruction) has to be obey by all ministries and local governments to procure their budget through r-procurement mechanism. However, untill 2012 fiscal year, this research found that only around 10.26% of central government institution proc...

  20. The Malaysian Public Procurement's Prevalent System and its Weaknesses

    OpenAIRE

    Rohana Othman; Husein Zakaria; Norlaili Nordin; Zamzam Shahidan; Kamaruzaman Jusoff

    2010-01-01

    Problem statement: This study examined the public procurement system as prevalent in the Malaysian government system of administration. Various aspects of public procurement are outlined including types and the processes that entail public procurement. This study also highlighted the weaknesses in the manual public procurement processes that are opened to potential abuse and mismanagement resulting in corruption. This study places the Malaysian Government public procurement system under the s...

  1. Procurement management in scientific research and production project

    International Nuclear Information System (INIS)

    Wan Yi

    2008-01-01

    To meet the requirement of development trend of scientific research and production, it is necessary to incorporate the modern procurement management theory in the whole procurement process for the items used in scientific research and production.This paper provided some suggestions to improve the procurement management by introducing the experiences in the application of the modern procurement management methods in the procurement of parts production. (author)

  2. An evaluation of transit procurement training.

    Science.gov (United States)

    Noland, Robert B; Weiner, Marc D; Klein, Nicholas J; Puniello, Orin D

    2017-04-01

    We evaluated a training course called "Orientation to Transit Procurement", designed and conducted by the National Transit Institute. This course is designed to provide Federal Transit Administration (FTA) grantees an overview of regulations and best practices related to the procurement process. Our objective in conducting the evaluation was to understand how transit agency staff made changes in procurement practices in response to the course training. The evaluation was mixed mode: an Internet survey followed by in-depth interviews with a small group of respondents. Survey respondents were also provided with an open-ended question providing us with additional context for our evaluation. Results show that the training is substantially successful at meeting the goal of improving procurement practices at transit agencies; indeed, most respondents report making changes at their agencies as the proximate result of the training. This was at odds with our exploration of knowledge of procurement topics, as most respondents gave inaccurate answers on multiple-choice "knowledge questions". This may have been due to question structure or, more likely, the nature of online surveys. Suitable training on the procurement of information technology was also a main concern. The lack of training in this area is indicative of the broader challenge facing public transit agencies in how to incorporate new forms of technology into their existing practices and bureaucratic structures. Copyright © 2016 Elsevier Ltd. All rights reserved.

  3. Cytogenetic examination in remote period after the stay in the Semipalatinsk nuclear test site area

    Directory of Open Access Journals (Sweden)

    Nugis V.Yu.

    2015-12-01

    Full Text Available Aim: retrospective cytogenetic indication of doses probably received by individuals during the residence in the region of the Semipalatinsk nuclear test site, at work or service in the Armed Forces on it. Material and methods: the analysis of chromosomal aberrations in peripheral blood lymphocyte cultures of 16 people с using FISH-method. Re-sults. The frequencies of FISH-registered translocations were not significantly different from control values in 7 out of 16 cases; the dose evaluations ranged from 0.20 to 0.75 Sv for the remaining 9 persons. Conclusion. FISH-technique of chromosome aberration analysis allows to make retrospective dose assessment; however it is desirable simultaneously to produce classical analysis also for a more correct interpretation of the results; Detection of single multiaber-rant cells in peripheral blood lymphocyte cultures is characteristic of persons who were in the areas of alpha-emitting radionuclide pollution, what is allowed to talk about radiation damage, but does not allow to make dose assessment.

  4. Donor selection criteria and procurement

    International Nuclear Information System (INIS)

    Agcaoili, N.R.

    1999-01-01

    Donor selection is one of the most important aspects of tissue banking practice. Without a good donor selection criteria, the results of any effort of trying to preserve tissues will have disastrous outcome for the recipient of these tissues. While with a very good and strict donor selection the Tissue Bank can guarantee safe and effective tissue allografts. There are significant aspects in the history and physical examination of the donor that must be emphasized. A donor exclusion criteria has also been formulated together with a list of all the needed laboratory examinations to eliminate possible diseases that may be transferred from the donor. The methods of procurement of tissue allografts from living and cadaver donors will be described. The limitations and advantages of each will be taken.There are also special restrictions that are important in the practice of removing the tissues from the donors. All the necessary equipment should be ready and the potential risk on the personnel should be known to all doing Tissue Banking

  5. PROCUREMENT IN THE SUPPLY CHAIN: AN ELEMENT OF HOTEL PRODUCT COMPETITIVENESS

    Directory of Open Access Journals (Sweden)

    Edna Mrnjavac

    2016-12-01

    organization is essential for the application of the supply-chain principles, but it can also have the opposite effect. The principles of supply chain organization and management are present in all investigated hotels, but to varying degrees. While obtaining the lowest price is singled out as the primary goal of procurement, the need to take into account other elements, such as the quality of procurement, products and services, is also emphasized because this makes it possible to create a hotel product that guests will be satisfied with. Conclusion: The presence of supply-chain elements in hotel procurement correlates with the size of the hotel enterprise, but not with the type of hotel or its location (type of tourist destination. The organizational basis of stand-alone hotels is better suited for the development of supply chains. Their less-formal business organization and decentralized procurement provide a suitable environment for focusing on and effectively managing the business process to enhance product quality. In contrast, centralized procurement embedded in the more rigid organization of hotel enterprises contains a number of barriers that go against the supply chain concept. Partly for this reason, the primary goal of hotel enterprises is price, while quality is only a secondary goal. Networked supply-chain structures are present in both cases, and high on the list of procurement goals is the importance of building sound relationships with prominent suppliers. Also important is that procurement organized in this way focuses on the long term; the supplier market and procurement terms are analyzed periodically and, if necessary, changes are made regarding suppliers and supplier relationships.

  6. EU contribution to the procurement of the ITER blanket first wall

    International Nuclear Information System (INIS)

    Lorenzetto, Patrick; Banetta, Stefano; Bellin, Boris; Boireau, Bruno; Bucci, Philippe; Cicero, Tindaro; Conchon, Denis; Dellopoulos, Georges; Hardaker, Stephen; Marshall, Paul; Nogué, Patrice; Pérez, Marcos; Gutierrez, Leticia Ruiz; Samaniego, Fernando; Sherlock, Paul; Zacchia, Francesco

    2016-01-01

    Highlights: • Presentation of the blanket first wall design concept to be procured by Europe. • Presentation of the main outcome of the R&D programme with the resulting FW fabrication route. • Presentation of the ITER first wall pre-qualification programme with the results achieved so far. • Presentation of the on-going irradiation experiments. • Presentation of the EU procurement strategy. - Abstract: Fusion for Energy (F4E), the European Union’s Domestic Agency for ITER, is responsible for the procurement of about 50% of the ITER blanket first wall (FW), called normal heat flux FW. A procurement strategy has been implemented by the In-Vessel Project Team at F4E aimed at mitigating technical and commercial risks for the procurement of ITER blanket FW panels, promoting as far as possible competition among industrial partners. This procurement strategy has been supported by an extensive Research and Development (R&D) programme, implemented over more than 15 years in Europe, to develop various fabrication technologies. It includes in particular the manufacture and testing of small-scale, medium-scale mock-ups and full-scale prototypes of blanket FW panels. In this R&D programme, significant efforts have been devoted to the development of a reliable materials joining technique. Hot Isostatic Pressing was selected for the manufacture of the FW panels made from beryllium, copper–chromium–zirconium alloy and 316L(N)-IG austenitic stainless steel. This paper presents the main outcome of the on-going R&D programme, the latest results of the FW qualification programme together with the procurement strategy implemented by F4E for the supply of the European contribution to the procurement of the ITER blanket FW.

  7. EU contribution to the procurement of the ITER blanket first wall

    Energy Technology Data Exchange (ETDEWEB)

    Lorenzetto, Patrick, E-mail: Patrick.Lorenzetto@f4e.europa.eu [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Banetta, Stefano; Bellin, Boris [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Boireau, Bruno [AREVA NP, Centre Technique, 71200 Le Creusot (France); Bucci, Philippe [Atmostat, rue René Hamon 31, 94815 Villejuif Cedex (France); Cicero, Tindaro [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Conchon, Denis [Atmostat, rue René Hamon 31, 94815 Villejuif Cedex (France); Dellopoulos, Georges [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Hardaker, Stephen [Amec Foster Wheeler plc, Booths Park, Chelford Road, Knutsford WA16 8QZ (United Kingdom); Marshall, Paul [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Nogué, Patrice [AREVA NP, Centre Technique, 71200 Le Creusot (France); Pérez, Marcos [Leading Enterprises SL, Pasaje de La Agüera, 39409 San Felices de Buelna (Spain); Gutierrez, Leticia Ruiz [Iberdrola Ingeniería y Construcción S.A.U., Avenida Manoteras 20, 28050 Madrid (Spain); Samaniego, Fernando [Leading Enterprises SL, Pasaje de La Agüera, 39409 San Felices de Buelna (Spain); Sherlock, Paul [Amec Foster Wheeler plc, Booths Park, Chelford Road, Knutsford WA16 8QZ (United Kingdom); Zacchia, Francesco [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain)

    2016-11-01

    Highlights: • Presentation of the blanket first wall design concept to be procured by Europe. • Presentation of the main outcome of the R&D programme with the resulting FW fabrication route. • Presentation of the ITER first wall pre-qualification programme with the results achieved so far. • Presentation of the on-going irradiation experiments. • Presentation of the EU procurement strategy. - Abstract: Fusion for Energy (F4E), the European Union’s Domestic Agency for ITER, is responsible for the procurement of about 50% of the ITER blanket first wall (FW), called normal heat flux FW. A procurement strategy has been implemented by the In-Vessel Project Team at F4E aimed at mitigating technical and commercial risks for the procurement of ITER blanket FW panels, promoting as far as possible competition among industrial partners. This procurement strategy has been supported by an extensive Research and Development (R&D) programme, implemented over more than 15 years in Europe, to develop various fabrication technologies. It includes in particular the manufacture and testing of small-scale, medium-scale mock-ups and full-scale prototypes of blanket FW panels. In this R&D programme, significant efforts have been devoted to the development of a reliable materials joining technique. Hot Isostatic Pressing was selected for the manufacture of the FW panels made from beryllium, copper–chromium–zirconium alloy and 316L(N)-IG austenitic stainless steel. This paper presents the main outcome of the on-going R&D programme, the latest results of the FW qualification programme together with the procurement strategy implemented by F4E for the supply of the European contribution to the procurement of the ITER blanket FW.

  8. FAKTOR-FAKTOR YANG MEMENGARUHI PROCUREMENT FRAUD: SEBUAH KAJIAN DARI PERSPEKTIF PERSEPSIAN AUDITOR EKSTERNAL

    Directory of Open Access Journals (Sweden)

    Zulaikha Zulaikha

    2016-12-01

    Full Text Available This study examines factors affecting fraud in the procurement of government’s goods and services from the independent auditor’s point of view. Based on fraud triangles and theory of planned behavior, this study proposes seven hypotheses which were tested using structural equation model (SEM-partial least square. This study used primary data gathered by survey to auditors of Audit Board of the Republic of Indonesia in its head office and several selected representative offices. Respondents were asked to provide their answer/perception for questions in questionnaire regarding factors influencing the procurement fraud of government’s goods and services. The results show that the procurement frauds are significantly influenced by weaknesses in procurement system, lack of procurement committee's quality, and the intention to engage fraud. Furthermore, the intention to engage fraud are influenced by attitude, subjective norms, and the perceived behavioral control. These findings suggest that procurement frauds are associated with individual factors as rationalization and opportunities. These factors could be considered when designing internal control structure to restrain fraud behavior.

  9. E-Procurement Service Quality in Malaysia

    Directory of Open Access Journals (Sweden)

    Sharifah Latifah binti Syed A. Kadir

    2016-12-01

    Full Text Available The electronic government in Malaysia has fully adopted and developed the applications and practices of ICTs, in order to provide better online services in enhancing the credibility of government. In order to understand service quality issues within this new delivery channel, this paper investigates E-procurement portal/websites’ through the use of E-Service-Quality (E-S-QUAL and E-Recovery Service-Quality (E- RecS-QUAL scales by using a questionnaire survey distributed to 400 respondents. The collected data was analysed using Smart PLS 3.0 to test the relationship between efficiency, system availability and privacy, responsiveness and contact. The results show that both E-S-QUAL and E-RecS-QUAL strongly influence perceived service quality and behavioural intentions. In addition, the evidence of perceived ser- vice quality on its role as a mediator of was significant. The findings constitute an empirical contribution to the extension of literature in the application of the electronic service quality.

  10. Transformation of fraud activities in procurement system in Indonesia

    Science.gov (United States)

    Setiani, N.; Huda, S. N.; Pulungan, R.; Winarko, E.

    2017-03-01

    E-procurement has been applied in Indonesia since 2008 through the adoption of Electronic Procurement System (SPSE). The purpose of the use of SPSE in the procurement process is to improve the efficiency of goods or services procurement. In the bidding process, intensive communication and data exchange between providers and organizers are urgently needed. Through SPSE, the frequency of face to face meetings between providers and the committee can be reduced. This is expected to minimize potential fraud behaviors in the goods or services procurement conducted through the tender process. There exists a transformation of activities in the procurement through SPSE from the tender process that was previously done manually. In this paper, we analyze this transformation between manual procurement process and SPSE-based procurement process. The result of the analysis is exploited for investigating the possibility of fraud behavior transformations in every phase of e-procurement activities.

  11. Networking for knowledge capacity building of procurement professionals in Ghana

    Directory of Open Access Journals (Sweden)

    Kissi Ernest

    2016-12-01

    Full Text Available The role of public procurement professionals in achieving value for money in public procurement activities is widely acknowledged around the globe. This has inspired the organisation of training programmes and workshops for procurement professionals, particularly those in developing countries in order to hone their knowledge and skills for proper management of government projects. This paper sought to explore the opportunities in networking for knowledge capacity building of procurement professionals in Ghana. The study adopted quantitative research methods for both data collection and analysis. The paper revealed that professional networking can offer procurement professionals the opportunity to acquire new knowledge from external professionals, know global trends about procurement practice, and obtain new information from other institutions about procurement. It is recommended that a platform that can support a network of procurement professionals in Ghana should be developed in order to ensure effective interaction and communication among procurement professionals for their capacity building.

  12. PUBLIC PROCUREMENT IN GHANA: THE IMPLEMENTATION CHALLENGES TO THE PUBLIC PROCUREMENT LAW 2003 (ACT 663

    Directory of Open Access Journals (Sweden)

    Ameyaw, Collins

    2012-08-01

    Full Text Available The purpose of this study was to identify various implementation bottlenecks to the Ghana Public Procurement Law 2003 (Act 663. The study adopted multiple research approaches, including; review of relevant literature, interviews and questionnaire survey of 49 District Assemblies and Metropolitan and Municipal Assemblies in the Ashanti and Brong Ahafo Regions of Ghana. The study identified low capacity of procurement professionals, low interaction between procurement entities and Public Procurement Authority (PPA, deliberate controlling of competition, non-compliance with provisions of the law, splitting of contracts into smaller lots, lack of funds and non-cooperativeness of suppliers, as the major challenges militating against the implementation of the Public Procurement Law.

  13. A proposed structural, risk-informed approach to the periodicity of CANDU-6 nuclear containment integrated leak rate testing

    Energy Technology Data Exchange (ETDEWEB)

    Saliba, N. [McGill Univ., Dept. of Civil Engineering and Applied Mechanics, Montreal, Quebec (Canada); Komljenovic, D. [Hydro-Quebec, Gentilly-2 Nuclear Power Plant, Becancour, Quebec (Canada); Chouinard, L. [McGill Univ., Dept. of Civil Engineering and Applied Mechanics, Montreal, Quebec (Canada); Vaillancourt, R.; Chretien, G. [Hydro-Quebec, Gentilly-2 Nuclear Power Plant, Becancour, Quebec (Canada); Gocevski, V. [Hydro-Quebec Equipements, Montreal, Quebec (Canada)

    2010-07-01

    As ultimate lines of defense against leakage of large amounts of radioactive material to the environment in case of major reactor accidents, containments have been monitored through well designed periodic tests to ensure their proper performance. Regulatory organizations have imposed types and frequencies of containment tests based on highly-conservative deterministic approaches, and judgments of knowledgeable experts. Recent developments in the perception and methods of risk evaluation have been applied to rationalize the leakage-rate testing frequencies while maintaining risks within acceptable levels, preserving the integrity of containments, and respecting the defense-in-depth philosophy. The objective of this paper is to introduce a proposed risk-informed decision making framework on the periodicity of nuclear containment ILRTs for CANDU-6 nuclear power plants based on five main decision criteria, namely: 1) the containment structural integrity; 2) inputs from PSA Level-2; 3) the requirements of deterministic safety analyses and defense-in-depth concepts; 4- the obligations under regulatory and standard requirements; and 5) the return of experience from nuclear containments historic performance. The concepts of dormant reliability and structural fragility will guide the assessment of the containment structural integrity, within the general context of a global containment life cycle management program. This study is oriented towards the requirements of CANDU-6 reactors, in general, and Hydro-Quebec's Gentilly-2 nuclear power plant, in particular. The present article is the first part in a series of papers that will comprehensively detail the proposed research. (author)

  14. A proposed structural, risk-informed approach to the periodicity of CANDU-6 nuclear containment integrated leak rate testing

    International Nuclear Information System (INIS)

    Saliba, N.; Komljenovic, D.; Chouinard, L.; Vaillancourt, R.; Chretien, G.; Gocevski, V.

    2010-01-01

    As ultimate lines of defense against leakage of large amounts of radioactive material to the environment in case of major reactor accidents, containments have been monitored through well designed periodic tests to ensure their proper performance. Regulatory organizations have imposed types and frequencies of containment tests based on highly-conservative deterministic approaches, and judgments of knowledgeable experts. Recent developments in the perception and methods of risk evaluation have been applied to rationalize the leakage-rate testing frequencies while maintaining risks within acceptable levels, preserving the integrity of containments, and respecting the defense-in-depth philosophy. The objective of this paper is to introduce a proposed risk-informed decision making framework on the periodicity of nuclear containment ILRTs for CANDU-6 nuclear power plants based on five main decision criteria, namely: 1) the containment structural integrity; 2) inputs from PSA Level-2; 3) the requirements of deterministic safety analyses and defense-in-depth concepts; 4- the obligations under regulatory and standard requirements; and 5) the return of experience from nuclear containments historic performance. The concepts of dormant reliability and structural fragility will guide the assessment of the containment structural integrity, within the general context of a global containment life cycle management program. This study is oriented towards the requirements of CANDU-6 reactors, in general, and Hydro-Quebec's Gentilly-2 nuclear power plant, in particular. The present article is the first part in a series of papers that will comprehensively detail the proposed research. (author)

  15. Psychological effects of amniocentesis on women and their spouses: importance of the testing period and genetic counseling.

    Science.gov (United States)

    Kukulu, Kamile; Buldukoglu, Kadriye; Keser, Ibrahim; Keser, Ilkay; Simşek, Mehmet; Mendilcioğlu, Inanç; Lüleci, Güven

    2006-03-01

    To evaluate both women's and their spouses' reasons for undergoing amniocentesis, their concerns relating to the procedure as well as their psychological reactions and coping mechanisms during the testing period. Eighty-five women undergoing amniocentesis and their spouses took part in the study. The couples completed a questionnaire that provided demographic data and insights into their experiences of amniocentesis. Age was the main reason for undergoing amniocentesis. When they first learned that they were going to undergo amniocentesis, women were more concerned about the potential danger to their fetus than their spouses. Most of participants believed that their pregnancy would continue after amniocentesis. However, they also stated that they were prepared for an abortion. Uncertainty and tension were two significant emotions experienced by couples while waiting for the test results. For the majority of women (80%) and men (42.3%) the strongest support was provided by their spouses during this period. In summary, we can conclude that the test did have a major psychological impact on both women and their spouses, but did not have a negative impact on their coping mechanisms. The psychological impact of amniocentesis on women and their spouses does not constitute a major obstacle to their ability to cope. However, a certain number of couples reported feelings of uncertainty, tension and anxiety about fetal injury. We strongly suggest that counseling should be given to high-risk families and that prenatal/antenatal care units must be established.

  16. Healthcare professionals' and parents' experiences of the confirmatory testing period: a qualitative study of the UK expanded newborn screening pilot.

    Science.gov (United States)

    Moody, Louise; Atkinson, Lou; Kehal, Isher; Bonham, James R

    2017-05-08

    With further expansion of the number of conditions for which newborn screening can be undertaken, it is timely to consider the impact of positive screening results and the confirmatory testing period on the families involved. This study was undertaken as part of a larger programme of work to evaluate the Expanded Newborn Screening (ENBS) programme in the United Kingdom (UK). It was aimed to determine the views and experiences of healthcare professionals (HCPs) and parents on communication and interaction during the period of confirmatory testing following a positive screening result. Semi-structured interviews were undertaken with parents of children who had received a positive ENBS result and HCPs who had been involved with the diagnosis and support of parents. Ten parents and 11 healthcare professionals took part in the in-depth interviews. Questions considered the journey from the positive screening result through confirmatory testing to a confirmed diagnosis and the communication and interaction between the parents and HCPs that they had been experienced. Key themes were identified through thematic analysis. The results point to a number of elements within the path through confirmatory testing that are difficult for parents and could be further developed to improve the experience. These include the way in which the results are communicated to parents, rapid turnaround of results, offering a consistent approach, exploring interventions to support family relationships and reviewing the workload and scheduling implications for healthcare professionals. As technology enables newborn screening of a larger number of conditions, there is an increasing need to consider and mediate the potentially negative effects on families. The findings from this study point to a number of elements within the path through confirmatory testing that are difficult for parents and could be further developed to benefit the family experience.

  17. IEA Task 24 Solar procurement 2000

    Energy Technology Data Exchange (ETDEWEB)

    Ellehauge, K.; Oestergaard, I. [Teknologisk Institut, Taastrup. SolEnergiCentret (Denmark); Gramkow, L. [Esbensen, Copenhagen (Denmark)

    2002-04-01

    The objective of the project is to develop and improve large procurements of solar heating systems in order to be able to place large orders with manufacturers and suppliers. The project work will be carried out as an international co-operation under IEA Task 24 with the title 'Solar Procurement'. By co-ordinating the effort between the 4-6 participating countries, the objective is to purchase at least 10,000 solar heating systems, of this amount 1,000-2,000 in Denmark. Such large orders make it possible for manufacturers and suppliers to deliver systems considerably cheaper, and it will be possible to develop systems for given specifications on output and efficiency. These co-ordinated large orders are expected to improve the price/efficiency conditions by up to 50%. The so called 'procurement process' (co-ordinated international procurement based on goal-oriented system development in co-operation between customers and suppliers/manufacturers) will in the project be followed up by information/marketing, education, financing schemes, service schemes, quality assurance and technical support. The project is divided into two main areas (IEA subtasks). 1: 'Procurement and Marketing' and 2: 'Creation of Tools'. Denmark has been requested to be the project manager of subtask 2, 'Creation of Tools'. (EHS)

  18. IEA Task 24 Solar procurement 2000

    International Nuclear Information System (INIS)

    Ellehauge, K.; Oestergaard, I.; Gramkow, L.

    2002-04-01

    The objective of the project is to develop and improve large procurements of solar heating systems in order to be able to place large orders with manufacturers and suppliers. The project work will be carried out as an international co-operation under IEA Task 24 with the title 'Solar Procurement'. By co-ordinating the effort between the 4-6 participating countries, the objective is to purchase at least 10,000 solar heating systems, of this amount 1,000-2,000 in Denmark. Such large orders make it possible for manufacturers and suppliers to deliver systems considerably cheaper, and it will be possible to develop systems for given specifications on output and efficiency. These co-ordinated large orders are expected to improve the price/efficiency conditions by up to 50%. The so called 'procurement process' (co-ordinated international procurement based on goal-oriented system development in co-operation between customers and suppliers/manufacturers) will in the project be followed up by information/marketing, education, financing schemes, service schemes, quality assurance and technical support. The project is divided into two main areas (IEA subtasks). 1: 'Procurement and Marketing' and 2: 'Creation of Tools'. Denmark has been requested to be the project manager of subtask 2, 'Creation of Tools'. (EHS)

  19. Monitoring what governments "give for" and "spend on" vaccine procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline.

    Directory of Open Access Journals (Sweden)

    E A S Nelson

    Full Text Available BACKGROUND: The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA and Vaccine Procurement Baseline (VPB are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP that governments spend on their own vaccine procurement. OBJECTIVE: To determine realistic targets for VPA and VPB. METHODS: Organization for Economic Co-Operation and Development (OECD and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC countries disbursed (as % of GDP in current US$ for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. FINDINGS: In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013% and United Kingdom (0.0085% disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024% and Canada (0.008% made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. CONCLUSIONS: Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a vaccine procurement; and b immunization programs.

  20. Monitoring what governments "give for" and "spend on" vaccine procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline.

    Science.gov (United States)

    Nelson, E A S; Bloom, David E; Mahoney, Richard T

    2014-01-01

    The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. To determine realistic targets for VPA and VPB. Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs.

  1. Diagnostics of Procurement Activity of Industrial Enterprise

    OpenAIRE

    Veretennikova Anna B.

    2012-01-01

    The importance of procurement activity of industrial enterprise is substantiated in the article. The results of the critical analysis of the existing approaches to procurement effectiveness evaluating are presented. The main directions of diagnostics of procurement activity of industrial enterprise such as the quality of the organization and the resources, the effectiveness and efficiency, security of logistics operations.В статье обоснована актуальность диагностирования закупочной деятельнос...

  2. Identification of the period of stability in a balance test after stepping up using a simplified cumulative sum.

    Science.gov (United States)

    Safieddine, Doha; Chkeir, Aly; Herlem, Cyrille; Bera, Delphine; Collart, Michèle; Novella, Jean-Luc; Dramé, Moustapha; Hewson, David J; Duchêne, Jacques

    2017-11-01

    Falls are a major cause of death in older people. One method used to predict falls is analysis of Centre of Pressure (CoP) displacement, which provides a measure of balance quality. The Balance Quality Tester (BQT) is a device based on a commercial bathroom scale that calculates instantaneous values of vertical ground reaction force (Fz) as well as the CoP in both anteroposterior (AP) and mediolateral (ML) directions. The entire testing process needs to take no longer than 12 s to ensure subject compliance, making it vital that calculations related to balance are only calculated for the period when the subject is static. In the present study, a method is presented to detect the stabilization period after a subject has stepped onto the BQT. Four different phases of the test are identified (stepping-on, stabilization, balancing, stepping-off), ensuring that subjects are static when parameters from the balancing phase are calculated. The method, based on a simplified cumulative sum (CUSUM) algorithm, could detect the change between unstable and stable stance. The time taken to stabilize significantly affected the static balance variables of surface area and trajectory velocity, and was also related to Timed-up-and-Go performance. Such a finding suggests that the time to stabilize could be a worthwhile parameter to explore as a potential indicator of balance problems and fall risk in older people. Copyright © 2017 IPEM. Published by Elsevier Ltd. All rights reserved.

  3. Organ procurement after euthanasia: Belgian experience.

    Science.gov (United States)

    Ysebaert, D; Van Beeumen, G; De Greef, K; Squifflet, J P; Detry, O; De Roover, A; Delbouille, M-H; Van Donink, W; Roeyen, G; Chapelle, T; Bosmans, J-L; Van Raemdonck, D; Faymonville, M E; Laureys, S; Lamy, M; Cras, P

    2009-03-01

    Euthanasia was legalized in Belgium in 2002 for adults under strict conditions. The patient must be in a medically futile condition and of constant and unbearable physical or mental suffering that cannot be alleviated, resulting from a serious and incurable disorder caused by illness or accident. Between 2005 and 2007, 4 patients (3 in Antwerp and 1 in Liège) expressed their will for organ donation after their request for euthanasia was granted. Patients were aged 43 to 50 years and had a debilitating neurologic disease, either after severe cerebrovascular accident or primary progressive multiple sclerosis. Ethical boards requested complete written scenario with informed consent of donor and relatives, clear separation between euthanasia and organ procurement procedure, and all procedures to be performed by senior staff members and nursing staff on a voluntary basis. The euthanasia procedure was performed by three independent physicians in the operating room. After clinical diagnosis of cardiac death, organ procurement was performed by femoral vessel cannulation or quick laparotomy. In 2 patients, the liver, both kidneys, and pancreatic islets (one case) were procured and transplanted; in the other 2 patients, there was additional lung procurement and transplantation. Transplant centers were informed of the nature of the case and the elements of organ procurement. There was primary function of all organs. The involved physicians and transplant teams had the well-discussed opinion that this strong request for organ donation after euthanasia could not be waived. A clear separation between the euthanasia request, the euthanasia procedure, and the organ procurement procedure is necessary.

  4. Innovative Procurement and Partnerships in Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2010-01-01

    strong requirements on the management style and company culture. Limitations of the research: The research is only based on two case studies, which obviously limits the possibility to generalize the results. Practical applications: The research presents two specific examples of innovative procurement......Aim: The aim of the paper is to present, analyse and identify learning from two case studies of innovative procurement in Facilities Management (FM) concerning the establishments of partnerships between clients and providers. Approach and methodology: A major study of FM best practice covering 36...

  5. Greening Non-Product-Related Procurement

    DEFF Research Database (Denmark)

    Mosgaard, Mette; Riisgaard, Henrik; Huulgaard, Rikke Dorothea

    2013-01-01

    link to the strategy for greening private consumption, as similarities exist and the purchasers lean on their private experiences when purchasing non-product related items; and finally, 3) Intensify the efforts in product categories in which strict normative legislation makes management more motivated....... environmental benefits of millions of procurement decisions do add up to large environmental improvement potentials. Thus, non-product-related procurement focuses on the similarities in the purchases made across different sectors. Explorative interviews with purchasers in Danish companies form the basis...

  6. Spare parts classification and procurement program

    International Nuclear Information System (INIS)

    Adlon, K.L.; Hassaballa, M.M.

    1986-01-01

    The cost benefits have been demonstrated for an integrated program, which is currently being implemented for two PWR stations with two 1100-MW units each. The component classification efforts reduced the number of safety-related components in several systems. Furthermore, the knowledge of the component specific function has contributed to the reduction of many safety-related parts per component, in addition to ensuring the procurement of parts to the correct safety level. The use of qualified commercial grade parts and components with their lower cost and reasonable procurement lead time compared to their 10 CFR 21 counterparts has a pronounced economic effect on the utility balance sheets

  7. Vascularized Composite Allografts: Procurement, Allocation, and Implementation.

    Science.gov (United States)

    Rahmel, Axel

    Vascularized composite allotransplantation is a continuously evolving area of modern transplant medicine. Recently, vascularized composite allografts (VCAs) have been formally classified as 'organs'. In this review, key aspects of VCA procurement are discussed, with a special focus on interaction with the procurement of classical solid organs. In addition, options for a matching and allocation system that ensures VCA donor organs are allocated to the best-suited recipients are looked at. Finally, the different steps needed to promote VCA transplantation in society in general and in the medical community in particular are highlighted.

  8. Sustainable Procurement in the United Nations

    DEFF Research Database (Denmark)

    Lund-Thomsen, Peter; Costa, Nives

    2011-01-01

    are highly contested among UN procurement officers and member states. However, so far the debate has mostly been based on assumptions about how the implementation of SP might affect developing country stakeholders. In fact, very few academic studies have been made of the economic, social and environmental......This paper deals with the integration of economic, social and environmental criteria into the purchasing practices of the United Nations (UN) system--also known as the UN engagement in sustainable procurement (SP). We argue that the debates about the pros and cons of the UN engaging in SP...

  9. Controlled procurement for nuclear power plants

    International Nuclear Information System (INIS)

    MacFarlane, I.S.

    1985-01-01

    A method is presented for establishing a controlled materials management system that facilitates materials procurement at nuclear power plants. This method is based on the determination of informational data requirements, appropriate input and approvals, and extent of administrative controls. Implementation of the techniques described herein will ensure that the accuracy of important procurement information is not compromised by unauthorized initial input or changes and/or failure to maintain the information. Needed material can thus be ordered through the materials management system with a high degree of confidence that the correct items are ordered, with minimal internal lead time and minimum delays during the receiving process

  10. Cross-national research on contractor evaluation procedures in public works procurement

    Science.gov (United States)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  11. E-Procurement, from Project to Practice: Empirical Evidence from the French Public Sector

    Science.gov (United States)

    Beauvallet, Godefroy; Boughzala, Younès; Assar, Saïd

    Public procurement constitutes a significant portion of national PIB in all countries and electronic platforms for supporting public transactions are an important application of e-government. In France, new regulations since 2005 are pushing public and private actors to adopt electronic means for handling all steps of the purchase process in public organisations. Based on quantitative and qualitative surveys made between 2005 and 2008, this chapter presents the general topic of e-procurement and specifically discusses the problem of e-procurement adoption in public institutions in France. The conclusions of these investigations spanning a three years period, are that public e-procurement is constantly progressing, although difficulties related to insufficient technical skills and the complexity of the juridical context hinder seriously its full adoption. They also show that a digital and an organisational divide is appearing between big administrations which have the adequate resources and skills to fully adopt e-procurement, and small administration (i.e. local authorities) which are still reluctant or unable to conduct a purchase in a digital manner.

  12. The Committed Changes Within Public Procurement Law in Turkey (2003-2014

    Directory of Open Access Journals (Sweden)

    Mehmet Nar

    2015-02-01

    Full Text Available It is aimed to reach international standards at procurement of goods or services and works by the state with the law no. 4734 constituted for preventing mismanagement, waste and corruption in public procurements. However, activities and payments which are carried out within this extent are open fields for corruption. Thus, this situation enables law provisions and also the power of Public Procurement Authority (PPA to be rearranged for the purposes of interest groups when necessary. So, our study is trying to question the content of arrangements which were prepared with great expectations at first during the period of current government, but since 2003, when they were put into practice, they have been changed and criticized significantly. Besides, the impressions in public opinions about the idea that the Law forms a basis for the waste of resources have become the research subject.

  13. Management of Contracts for F110 Engine Procurements

    National Research Council Canada - National Science Library

    Granetto, Paul

    2001-01-01

    This audit was performed in response to an allegation to the Defense Hotline that the Wright-Patterson Air Force Base Procurement Contracting Office made poor procurement decisions on F110 aircraft engine contracts...

  14. GPP Webinar: Solar Procurement Templates and Tools for Higher Education

    Science.gov (United States)

    Green Power Partnership webinar on solar procurement for Higher Education which features various tools and templates that schools can use to shape and manage the solar procurement process to a successful outcome.

  15. Design of reactive power procurement in deregulated electricity market

    African Journals Online (AJOL)

    user

    novel reactive power procurement model is proposed, which ensure secure and ..... The simulation is performed in the Matlab. .... focus of this paper is a reactive procurement market model, which is a basically two-step optimization process.

  16. 76 FR 37069 - Procurement List; Proposed Additions and Deletion

    Science.gov (United States)

    2011-06-24

    ... Certification The following products and service are proposed for addition to Procurement List for production by... following product is proposed for deletion from the Procurement List: Product Detergent, Laundry NSN: 7930...

  17. European technology activities to prepare for ITER component procurement

    International Nuclear Information System (INIS)

    Gasparotto, M.

    2006-01-01

    Over the past few years the technology activities of the European fusion programme have principally been devoted to: a) the completion of design and R (and) D studies in preparation for the procurement of ITER systems and components in close collaboration with the ITER team and according to the ITER design and schedule; b) provision of support to European industry and associations in key areas of fusion R (and) D to ensure a competitive and timely approach to the planned procurement. The EU contribution to ITER design and R (and) D activities has been maintained at a significant level with the objectives of: · continuing, and in some areas expanding, the effort in areas where design and R (and)D are still required: in particular in Machine Assembly, Remote Handling, ITER Test Blanket Modules, Diagnostics, Heating and Current Drive Systems. · continuing and completing manufacturing R (and)D to determine the most technically and cost affective manufacturing methods for ITER components to be built in Europe. · preparing new test facilities needed during ITER construction (DIPOLE, HELOKA, DTP-2, ECRH Test Facility, Fatigue Testing Facility). · supporting the European site preparation process and the preparation of safety and licensing documentation for ITER in Cadarache. · maintaining support to EU industries in R (and) D activities of relevance to fusion. To support the ITER Design activities and to prepare for the provision of timely answers to key issues, which may be raised during the ITER design review, support from specialized companies has been set-up in the fields of Civil and General Plant Engineering, Mechanical Engineering / Components, Mechanical Engineering / Systems (and) Plants, Remote Handling (and) Assembly, Electrical Engineering, Nuclear Safety Engineering. In recent years major efforts have been directed towards the technology development of the ITER components for which procurement can be launched during the first years of the construction

  18. Regional trade agreements & procurement rules : facilitators or hindrances?

    OpenAIRE

    ANDERSON, Robert D.; MÜLLER, Anna Caroline; PELLETIER, Philippe

    2015-01-01

    This Working Paper considers the significance of government procurement chapters in regional trade agreements (RTAs), both in their own right and vis-à-vis the WTO Agreement on Government Procurement (GPA). The paper finds, inter alia, that: (i) a strong complementarity exists between government procurement trade commitments and general goods and services trade commitments, making integration of procurement commitments in a more general system such as the WTO Agreements desirable; (ii) govern...

  19. Innovation public procurement in Russia: problems of institutional arrangements

    Directory of Open Access Journals (Sweden)

    Korytcev Maxim, A.

    2015-12-01

    Full Text Available The paper explores the problems of public procurement in innovation sphere in Russia, its institutional organization. In international practice, some strategies of innovation stimulation (by public procurement are developing. There is necessity to use more elements of these strategies in Russian National Procurement System. The active National Public Procurement System has no enough effective methods and instruments for stimulating innovation development now.

  20. Effects of Procurement Related Factors on Construction Project ...

    African Journals Online (AJOL)

    Several Literatures in construction management support the view that procurements have impacts on project performance. Aim of this study is to investigate the effects of procurement related factors of procurement selection criteria, tendering methods and variation orders on project performance. Purpose of the study is to ...

  1. 7 CFR 235.9 - Procurement and property management standards.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management standards. 235.9... Procurement and property management standards. (a) Requirements. State agencies shall comply with the requirements of 7 CFR part 3016 concerning the procurement of supplies, equipment and other services with State...

  2. 41 CFR 101-26.507-2 - Procurement time schedule.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedule. 101-26.507-2 Section 101-26.507-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...

  3. 7 CFR 248.21 - Procurement and property management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management. 248.21 Section... Provisions § 248.21 Procurement and property management. (a) Requirements. State agencies shall comply with the requirements of 7 CFR part 3016 for procurement of supplies, equipment and other services with...

  4. 41 CFR 101-26.501-5 - Procurement time schedules.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedules. 101-26.501-5 Section 101-26.501-5 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...

  5. 76 FR 78248 - Procurement List; Addition and Deletions

    Science.gov (United States)

    2011-12-16

    .... Service Type/Location: Laundry Service, Stratton Medical Center, 113 Holland Ave, Albany, NY. [[Page 78249...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...

  6. Greening Operations Management: An Online Sustainable Procurement Course for Practitioners

    Science.gov (United States)

    Walker, Helen L.; Gough, Stephen; Bakker, Elmer F.; Knight, Louise A.; McBain, Darian

    2009-01-01

    In the Operations Management field, sustainable procurement has emerged as a way to green the purchasing and supply process. This paper explores issues in sustainable procurement training. The authors formed an interdisciplinary team to design, deliver and evaluate a training programme to promote and develop sustainable procurement in the United…

  7. Nepal : Electronic Government Procurement Readiness Assessment and Roadmap

    OpenAIRE

    World Bank

    2007-01-01

    The assessment focused on the degree of readiness of Government of Nepal's (GoN's) current public procurement environment for making a transition from a traditional paper-based, manual procurement transaction processing and communication to electronic government procurement (e-GP). Some 20 public and private sector organizations, involved in a wide range of functions that relate to public...

  8. Maldives : Electronic Government Procurement Readiness Assessment and Roadmap

    OpenAIRE

    World Bank

    2007-01-01

    The assessment focuses on the degree of readiness of Government of The Maldives's (GoTM's) current public procurement environment for making a transition from traditional paper-based, manual methods of procurement transaction processing and communication to electronic government procurement (e-GP). The e-GP Assessment was discussed individually with informed respondents in the public and p...

  9. Study on Comparative Efficiencies in Vaccine Procurement Mechanisms

    OpenAIRE

    Bumpas, Janet

    2008-01-01

    Vaccinations are amongst the most cost-effective public health interventions. Vaccine procurement is a complex issue that interweaves the domains of public health, commodity security, ethics, and procurement. Its cross-disciplinary nature means that neither a straightforward analysis stemming from just one discipline nor a cookie-cutter application of World Bank procurement principles of e...

  10. 32 CFR 22.205 - Distinguishing assistance from procurement.

    Science.gov (United States)

    2010-07-01

    ... procurement contract, is the appropriate instrument, based on the following: (a) Purpose. (1) The grants... purpose is acquisition, then the grants officer shall judge that a procurement contract is the appropriate... 32 National Defense 1 2010-07-01 2010-07-01 false Distinguishing assistance from procurement. 22...

  11. Procurement maturity, alignment and performance: a Dutch hospital case comparison.

    NARCIS (Netherlands)

    Plomp, M.; Batenburg, R.

    2009-01-01

    Procurement is an important supporting business function, with which competitive advantage can potentially be achieved. In this paper, the relation between maturity and alignment in procurement on the one hand, and procurement performance on the other, is investigated in the case study setting of

  12. Procurement Maturity, Alignment and Performance: a Dutch Hospital Case Comparison

    NARCIS (Netherlands)

    Plomp, M.G.A.; Batenburg, R.S.

    2009-01-01

    Procurement is an important supporting business function, with which competitive advantage can potentially be achieved. In this paper, the relation between maturity and alignment in procurement on the one hand, and procurement performance on the other, is investigated in the case study setting of

  13. 41 CFR 101-26.602-4 - Procurement of coal.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  14. 20 CFR 627.420 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... sources, unless it is demonstrated that the JTPA-funded alternative services or facilities would be more...) Each State and subrecipient shall conduct procurements in a manner which provides full and open... pricing practices between firms or organizations or between affiliated companies or organizations; (iv...

  15. 38 CFR 49.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 49.46... of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. (Authority: Pub. L. 104-156; 110 Stat. 1396) ...

  16. 45 CFR 2541.360 - Procurement.

    Science.gov (United States)

    2010-10-01

    ... foster greater economy and efficiency, grantees and subgrantees are encouraged to enter into State and... procured, and when necessary, shall set forth those minimum essential characteristics and standards to... grantee or subgrantee desires to have the review accomplished after a solicitation has been developed, the...

  17. 20 CFR 437.36 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... greater economy and efficiency, grantees and subgrantees are encouraged to enter into State and local... procured, and when necessary, must set forth those minimum essential characteristics and standards to which... desires to have the review accomplished after a solicitation has been developed, SSA may still review the...

  18. Online Reverse Auctions for Procurement of Services

    NARCIS (Netherlands)

    U.L. Radkevitch (Uladzimir)

    2008-01-01

    textabstractOnline reverse auctions, in which a buyer seeks to select a supplier and suppliers compete for contracts by bidding online, revolutionized corporate procurement early this century. Shortly after they had been pioneered by General Electric, many companies rushed to adopt reverse auctions

  19. 21 CFR 1403.36 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... be a selection criteria provided its application leaves an appropriate number of qualified firms... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Procurement. 1403.36 Section 1403.36 Food and.... No employee, officer or agent of the grantee or subgrantee shall participate in selection, or in the...

  20. Procurement of medical equipment in Sweden

    Directory of Open Access Journals (Sweden)

    Heikki Terio

    2010-02-01

    Full Text Available In many hospitals in Sweden the importance of technology management is already accepted and accepted since the hospital managements have recognised that technology is an integral part of all major policy and planning decisions. Today’s medical devices are technically complex and sometimes a system of interacting devices is required to achieve the desired clinical function. If the hospitals want to use the latest, modern technology, then they need to make substantial investments in both equipment and competence. Complex technology, large investments and need of highly qualii ed personnel to handle the medical devices are factors that indicate a need of well-dei ned procurement process as an essential part of the total health technology management system that should be used in a hospital. In such a procurement process, carefully prepared planning of technology investments can reduce the running costs and costs for maintenance substantially. In addition, a well-dei ned procurement process contributes to increase the patient safety. In Karolinska University Hospital goods and services are purchased for more than 20% of the hospital’s €1.2 billion turnover. It is therefore very important that the procurement is carried out ef ectively.

  1. 78 FR 59658 - Procurement List; Additions

    Science.gov (United States)

    2013-09-27

    ... Accordingly, the following products and services are added to the Procurement List: Products Laundry Net... ADMINISTRATION, BOULDER, CO. Service Type/Location: Laundry Service, US Coast Guard Base, Portsmouth, VA. NPA... GUARD, BASE PORTSMOUTH, PORTSMOUTH, VA Service Type/Location: Laundry Service, Federal Bureau of Prisons...

  2. Pre-commercial procurement : regulatory effectiveness?

    NARCIS (Netherlands)

    Apostol, Anca Ramona

    2014-01-01

    Is public procurement of research and development (‘R&D’) services the key to European Union (‘EU’)’s sustainable welfare? Is it being regulated in accordance with economic prescripts for effectiveness? Is the regulatory and policy setting clear and comprehensive in order to stimulate a widespread

  3. 78 FR 34351 - Procurement List; Additions

    Science.gov (United States)

    2013-06-07

    .... ADDRESSES: Committee for Purchase from People Who are Blind or Severely Disabled, 1401 S. Clark Street... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions AGENCY: Committee for Purchase from People Who are Blind or Severely Disabled. ACTION: Additions to the...

  4. 78 FR 53734 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-08-30

    ...: Committee for Purchase From People Who Are Blind or Severely Disabled, 1401 S Clark Street, Suite 10800... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  5. 78 FR 77105 - Procurement List; Proposed Addition

    Science.gov (United States)

    2013-12-20

    ... People Who Are Blind or Severely Disabled, 1401 S. Clark Street, Suite 10800, Arlington, Virginia, 22202... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Addition AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  6. 78 FR 50040 - Procurement List, Proposed Additions

    Science.gov (United States)

    2013-08-16

    ... People Who Are Blind or Severely Disabled, 1401 S Clark Street, Suite 10800, Arlington, Virginia, 22202... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List, Proposed Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  7. 78 FR 19248 - Procurement List; Proposed Addition

    Science.gov (United States)

    2013-03-29

    ... Purchase From People Who Are Blind or Severely Disabled, 1401 S. Clark Street, Suite 10800, Arlington... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Addition AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  8. Organ procurement from executed prisoners in China.

    Science.gov (United States)

    Sharif, A; Singh, M Fiatarone; Trey, T; Lavee, J

    2014-10-01

    Organ procurement from executed prisoners in China is internationally condemned, yet this practice continues unabated in 2014. This is despite repeated announcements from Chinese authorities that constructive measures have been undertaken to conform to accepted ethical standards. While there is unanimous agreement on the unethical nature of using organs from executed prisoners, due to its limitations on voluntary and informed consent, there is insufficient coverage of forced organ procurement from prisoners of conscience without consent. Strategies to influence positive change in China over the last few decades have failed to bring this practice to an end. While organ donation and transplantation services in China have undergone considerable structural changes in the last few years, fundamental attempts to shift practice to ethically sourced organs have floundered. In this article, we discuss the organ trade in China, reflect upon organ procurement from executed prisoners (including both capital prisoners and prisoners of conscience) and provide an overview of contradictory Chinese efforts to halt forced organ procurement from executed prisoners. Finally, we highlight current actions being taken to address this issue and offer comprehensive recommendations to bring this ethically indefensible practice to an immediate end. © Copyright 2014 The American Society of Transplantation and the American Society of Transplant Surgeons.

  9. Issues in organ procurement, allocation, and transplantation.

    Science.gov (United States)

    Nierste, Deborah

    2013-01-01

    Organ transplantation extends lives and improves health but presents complex ethical dilemmas for nurses caring for donors, recipients, and their families. This article overviews organ procurement and allocation, discusses ethical dilemmas in transplantation, and offers strategies from professional and biblical perspectives for coping with moral distress and maintaining compassionate care.

  10. 77 FR 70738 - Procurement List Additions

    Science.gov (United States)

    2012-11-27

    ... Fire Fighters, Metal NSN: CBFF0053--Nameplate, Navy Fire Fighters, 2 Line, Metal NSN: CBFF0054--Collar, Brass, Navy Fire Fighters, Metal NSN: CBFF0055--Shorts, Navy Fire Fighters, Physical Training, Small... following products are added to the Procurement List: PRODUCTS: NSN: CBFF0001--Shirt, Navy Fire Fighters...

  11. SMEs cooperate to meet social procurement conditions

    NARCIS (Netherlands)

    Oden, Petra

    2015-01-01

    A growing amount of (semi) public organizations in the Netherlands write tenders with mandatory social conditions. It is important for SMEs to focus on social procurement in their business strategy. SMEs should be proactive and try to affect the conditions (semi) public organizations write in their

  12. 76 FR 57719 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-09-16

    ... proposed for addition to the Procurement List for production by the nonprofit agencies listed: Products NSN: 7930-00-NIB-0583--Refills, Bathroom Cleaner and Deodorizer, Cartridge Concentrate. NSN: 7930-00-NIB-0584--Starter Kit, Bathroom Cleaner and Deodorizer, Cartridge Concentrate. NSN: 7930-00-NIB-0585...

  13. 78 FR 12296 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-02-22

    ... services are proposed for addition to the Procurement List for production by the nonprofit agencies listed... and Trailer Wash, 55 GL NSN: 7930-00-NIB-0649--Cleaner/Degreaser, Heavy Duty, Biodegradable, Car and Trucks, 5 GL NSN: 7930-00-NIB-0650--Cleaner/Degreaser, Heavy Duty, Biodegradable, Car and Trucks, 55 GL...

  14. 36 CFR 1207.36 - Procurement.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Procurement. 1207.36 Section 1207.36 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... resonableness can be established on the basis of a catalog or market price of a commercial product sold in...

  15. Antiretroviral procurement and supply chain management.

    Science.gov (United States)

    Ripin, David J; Jamieson, David; Meyers, Amy; Warty, Umesh; Dain, Mary; Khamsi, Cyril

    2014-01-01

    Procurement, the country-level process of ordering antiretrovirals (ARVs), and supply chain management, the mechanism by which they are delivered to health-care facilities, are critical processes required to move ARVs from manufacturers to patients. To provide a glimpse into the ARV procurement and supply chain, the following pages provide an overview of the primary stakeholders, principal operating models, and policies and regulations involved in ARV procurement. Also presented are key challenges that need to be addressed to ensure that the supply chain is not a barrier to the goal of universal coverage. This article will cover the steps necessary to order and distribute ARVs, including different models of delivery, key stakeholders involved, strategic considerations that vary depending on context and policies affecting them. The single drug examples given illustrate the complications inherent in fragmented supply and demand-driven models of procurement and supply chain management, and suggest tools for navigating these hurdles that will ultimately result in more secure and reliable ARV provision. Understanding the dynamics of ARV supply chain is important for the global health community, both to ensure full and efficient treatment of persons living with HIV as well as to inform the supply chain decisions for other public health products.

  16. Procurement Officer | IDRC - International Development Research ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... efficient, and ethical and provide the best possible value to the IDRC; supporting the ... procurement processes are perceived by suppliers as fair, open and ethical; ... while ensuring to protect confidential information;; analyses, negotiates and ... and knowledge, and interpret, assess and communicate current IDRC policy, ...

  17. 78 FR 73504 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-12-06

    ... Logistics Support Detachment, Undisclosed Location*, Ft. Belvoir, VA. NPA: MVLE, Inc., Springfield, VA. Contracting Activity: Directorate of Contracting Procurement Logistics Support Detachment, Fort Belvoir, VA.... Lineback, Director, Business Operations. [FR Doc. 2013-29139 Filed 12-5-13; 8:45 am] BILLING CODE 6353-01-P ...

  18. 77 FR 60969 - Procurement List; Additions

    Science.gov (United States)

    2012-10-05

    ... Are Blind or Severely Disabled published a notice for additions to the Procurement List with the... Committee for Purchase From People Who Are Blind or Severely Disabled published notices of proposed..., Phoenix, AZ. Service Type/Location: Custodial and Grounds Maintenance Services, Austin Courthouse, 501...

  19. Driving sustainable supply chain management in the public sector:The importance of public procurement in the EU

    OpenAIRE

    Amann, Markus; Roehrich, Jens; Essig, Michael; Harland, Christine

    2014-01-01

    Purpose– The purpose of this paper is to provide evidence of connections between sustainability policy goals included in public procurement tenders and offers and their achievement through contract award. Design/methodology/approach– Two hypotheses based on extant literature and the inducement–contribution theory were tested by means of a survey of 281 procurement files from 2007 to 2009 relating to eight product categories and four European Union (EU) member states. Data were analyzed using ...

  20. Does Pharmaceutical Pricing Transparency Matter? Examining Brazil's Public Procurement System.

    Science.gov (United States)

    Kohler, Jillian Clare; Mitsakakis, Nicholas; Saadat, Faridah; Byng, Danalyn; Martinez, Martha Gabriela

    2015-08-04

    We review procurement and pricing transparency practices for pharmaceutical products. We specifically focus on Brazil and examine its approach to increasing pricing transparency, with the aim of determining the level of effectiveness in lower prices using a tool (Banco de Preços em Saúde, BPS) that only reveals purchase prices as compared to other tools (in other countries) that establish a greater degree of price transparency. A general report of Preços em Saúde (BPS) and Sistema Integrado de Administração de Serviços Gerais (SIASG) pricing data was created for 25 drugs that met specific criteria. To explore the linear time trend of each of the drugs, separate regression models were fitted for each drug, resulting in a total of 19 models. Each model controlled for the state variable and the interaction between state and time, in order to accommodate expected heterogeneity in the data. Additionally, the models controlled for procurement quantities and the effect they have on the unit price. Secondary analysis using mixed effects models was also carried out to account for the impact that institutions and suppliers may have upon the unit price. Adjusting for these predictor variables (procurement quantities, supplier, purchasing institution) was important to determine the sole effect that time has had on unit prices. A total of 2 x 19 = 38 models were estimated to explore the overall effect of time on changes in unit price. All statistical analyses were performed using the R statistical software, while the linear mixed effects models were fitted using the lme4 R package. The findings from our analysis suggest that there is no pattern of consistent price decreases within the two Brazilian states during the five-year period for which the prices were analyzed. While the BPS does allow for an increase in transparency and information on drug purchase prices in Brazil, it has not shown to lead to consistent reductions in drug purchase prices for some of the most

  1. Forward Commitment Procurement : A practical methodology that helps to manage risk in procuring innovative goods and services

    NARCIS (Netherlands)

    Whyles, G.; Meerveld, H. van; Nauta, N.J.

    2015-01-01

    The Forward Commitment Procurement (FCP) is a Public Procurement of Innovation (PPI) methodology. It was specifically designed to both provide a practical methodology for procurers to follow and to manage the perceived risk of the customer and supplier in innovation investments. The paper describes

  2. Procurement and control of spare and replacement parts - a regulatory perspective

    International Nuclear Information System (INIS)

    Baker, E.T.; Grimes, B.K.; Merschoff, E.W.

    1987-01-01

    As the nuclear industry shifts from a construction to an operations orientation, a number of fundamental changes have occurred in the type of safety-related procurements and the manner in which the utilities accomplish these procurements. Specifically, procurements have shifted from the purchase of large systems and components by architect-engineers, and nuclear steam supply system (NSSS) suppliers to the procurement by utilities of subassemblies, individual pieces of equipment (e.g., breakers, relays), and small parts for repairing individual pieces of equipment. To ensure that equipment will continue to perform its intended function and to satisfy regulatory requirements utilities must consider several things: (1) does the equipment perform a safety function; (2) does the replacement part affect the safety function; and (3) does the replacement part affect the seismic or environmental qualification. If the answer to any of these questions is yes, the purchaser has two alternatives. He may procure the item as safety-related and require the supplier or manufacturer to comply with all the applicable technical and quality requirements or he may purchase the item commercial grade and perform the necessary inspections and tests to ensure the item meets the requirements, i.e., dedicate the item

  3. VENDOR SELECTION AND DETERMINING PROCUREMENT QUOTAS IN CONDITIONS WHEN DISCOUNTS ARE OFFERED ON THE TOTAL VALUE OF THE CONTRACTED PROCUREMENT OF MANY DIFFERENT PRODUCTS

    Directory of Open Access Journals (Sweden)

    Zoran Babic

    2012-04-01

    Full Text Available Vendor selection is a very significant business problem for ensuring the competitiveness on the market. That is why companies pay great attention to this problem. To solve the vendor selection problems can be applied to a number of quantitative methods. Depending on the goals of the company the vendor selection can be a mono-criterion or multi-criterion programming problem. This paper deals with the problem of vendor selection and determining procurement quotas from selected vendors under conditions where vendors offer discounts to the total order value within a specified period where the buyer buys more products from the vendors. The total value of procurement costs in a given period is taken as an optimization criterion. In this paper the specific flour purchase problem is solved for a company that manufactures bakery products

  4. VENDOR SELECTION AND DETERMINING PROCUREMENT QUOTAS IN CONDITIONS WHEN DISCOUNTS ARE OFFERED ON THE TOTAL VALUE OF THE CONTRACTED PROCUREMENT OF MANY DIFFERENT PRODUCTS

    Directory of Open Access Journals (Sweden)

    Zoran Babić

    2012-04-01

    Full Text Available Vendor selection is a very significant business problem for ensuring the competitiveness on the market. That is why companies pay great attention to this problem. To solve the vendor selection problems can be applied to a number of quantitative methods. Depending on the goals of the company the vendor selection can be a mono-criterion or multi-criterion programming problem. This paper deals with the problem of vendor selection and determining procurement quotas from selected vendors under conditions where vendors offer discounts to the total order value within a specified period where the buyer buys more products from the vendors. The total value of procurement costs in a given period is taken as an optimization criterion. In this paper the specific flour purchase problem is solved for a company that manufactures bakery products.

  5. The problems of accountable and analytical procuring of enterprise management

    Directory of Open Access Journals (Sweden)

    Kovalova Tatiana Volodymyrivna

    2016-02-01

    Full Text Available This article investigated main aspects of accountable and analytical procuring of enterprise management. It was found essence of accountable and analytical procuring of enterprise management, purpose, functions and tasks. It was determined main elements and essence of accountable and analytical information taking into consideration needs of modern management. In the article are exposed structural elements of accountable and analytical procuring. It was formed conceptual approaches of building accountable and analytical procuring of enterprise management. It was analyzed main problems of improving accountable and analytical informational procuring of taking managerial decisions with the aim of solving economic problems due to current situation of national economy.

  6. Potential fraudulent behaviors in e-procurement implementation in Indonesia

    Science.gov (United States)

    Huda, S. N.; Setiani, N.; Pulungan, R.; Winarko, E.

    2017-03-01

    Corruptions in public procurement have occurred in various parts of the world, especially in developing countries. Implementation of SPSE (electronic procurement system) as the e-procurement system in Indonesia is based on the government’s intentions towards clean and good governance by fighting corruption, collusion, and nepotism. Procurement in Indonesia is carried out through SPSE, which is developed by LKPP (Government Policy on Procurement of Goods/Services). Although this system has brought many positive effects, there are still found many practices of fraud occurring in the implementation of the system. In this paper, we try to identify these practices and then to systematically categorize and analyze them.

  7. Public perspectives on biospecimen procurement: what biorepositories should consider.

    Science.gov (United States)

    L'Heureux, Jamie; Murray, Jeffrey C; Newbury, Elizabeth; Shinkunas, Laura; Simon, Christian M

    2013-06-01

    Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus "direct" procurement strategies such as the drawing of blood. Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens.

  8. EIA and green procurement: Opportunities for strengthening their coordination

    International Nuclear Information System (INIS)

    Uttam, Kedar; Faith-Ell, Charlotta; Balfors, Berit

    2012-01-01

    EIA plays an important role in enhancing the environmental performance of the construction sector. In recent years, the construction sector has been developing green procurement practices. Green procurement is a process that involves the incorporation of environmental requirements during the procurement of services and products. However, discussion on green procurement is rarely seen during the EIA phase. This paper addresses possible opportunities for improving the coordination between EIA and green procurement within the construction sector. The linking of EIA and green procurement has been postulated in the paper as an aid to strengthen the coordination between project planning and implementation. The paper is based on a literature review and is an outcome of an on-going research project concerning EIA and green procurement. This study indicated that it would be appropriate to introduce green procurement during the pre-decision phase of an EIA. In the present study, the opportunities for integrating green procurement at the stage of EIA are associated with the integration of project planning and EIA. Future research should investigate the mechanism through which the link can be established. - Highlights: ► This paper identifies opportunities to link EIA and green procurement. ► Pre-decision phase of EIA could be appropriate for planning green procurement. ► Future research should investigate the mechanism for establishing the link.

  9. EIA and green procurement: Opportunities for strengthening their coordination

    Energy Technology Data Exchange (ETDEWEB)

    Uttam, Kedar, E-mail: kedar@kth.se [Department of Land and Water Resources Engineering, Royal Institute of Technology, Stockholm (Sweden); Faith-Ell, Charlotta, E-mail: charlotta.faith-ell@WSPGroup.se [WSP Sweden (Sweden); Balfors, Berit, E-mail: balfors@kth.se [Department of Land and Water Resources Engineering, Royal Institute of Technology, Stockholm (Sweden)

    2012-02-15

    EIA plays an important role in enhancing the environmental performance of the construction sector. In recent years, the construction sector has been developing green procurement practices. Green procurement is a process that involves the incorporation of environmental requirements during the procurement of services and products. However, discussion on green procurement is rarely seen during the EIA phase. This paper addresses possible opportunities for improving the coordination between EIA and green procurement within the construction sector. The linking of EIA and green procurement has been postulated in the paper as an aid to strengthen the coordination between project planning and implementation. The paper is based on a literature review and is an outcome of an on-going research project concerning EIA and green procurement. This study indicated that it would be appropriate to introduce green procurement during the pre-decision phase of an EIA. In the present study, the opportunities for integrating green procurement at the stage of EIA are associated with the integration of project planning and EIA. Future research should investigate the mechanism through which the link can be established. - Highlights: Black-Right-Pointing-Pointer This paper identifies opportunities to link EIA and green procurement. Black-Right-Pointing-Pointer Pre-decision phase of EIA could be appropriate for planning green procurement. Black-Right-Pointing-Pointer Future research should investigate the mechanism for establishing the link.

  10. Monitoring What Governments “Give for” and “Spend on” Vaccine Procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline

    OpenAIRE

    Nelson, E. A. S.; Bloom, David E.; Mahoney, Richard T.

    2014-01-01

    BACKGROUND: The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of...

  11. Procurement management for modification of supports and hangers in Tianwan nuclear power station phase I

    International Nuclear Information System (INIS)

    Jin Jiadong

    2015-01-01

    After completing construction of TNPS Phase I, some of supports and hangers supplied by Russia including many nuclear safety class supports and hangers were unexpectedly found quality problem. It is necessary to purchase the domestic product as replacement. The works on modification of supports and hangers became one of the key paths of TNPS construction. Under condition of that there isn't any reference in this aspect in nuclear power construction, Jiangsu Nuclear Power Corporation has always adhered to the principle of 'Safety first and quality first', overcome many difficulties of procurement, carried out the procurement work scientifically and reasonably under the condition of urgent need for the engineering construction, and ensured the quality control and schedule control. A large amount of procurement works for the modified supports and hangers were finished within short period. This firmly assured the construction period of TNPS. At the same time, a method of procurement management under the condition of urgent need for the engineering construction has been explored. (author)

  12. Assessment of work-related muscle strain by using surface EMG during test contractions interposed between work periods of simulateted mushroom picking

    DEFF Research Database (Denmark)

    Ohashi, Jun-Ya; Blangsted, Anne Katrine; Nielsen, Pernille Kofoed

    2010-01-01

    Surface electromyograms(EMG) during test contractions (TCs) were studied to assess the muscle strain in simulated mushroom picking. Additionally, the duration of the TC for the effective assessment was investigated. Nine female subjects performed standardized shoulder abduction and a stooped...... posture for one minute as TCs. Each experiment consisted of a 60-min rest, three work periods (W1-W3), a 30-min rest, and two work periods (W4 and W5) separated by a 30-min rest period. The duration of each work period was about 20 min. A total of 18 TCs was performed between the work periods and every 10...

  13. 40 CFR Appendix I to Subpart S of... - Vehicle Procurement Methodology

    Science.gov (United States)

    2010-07-01

    ... I to Subpart S of Part 86—Vehicle Procurement Methodology I. Test Sampling: The master owner list... randomized master owner list. The manufacturer or their representative shall perform the following steps: (a... order of their appearance on a randomized master owner list until the required number of vehicles are...

  14. The effect of a period of intensive exercise on the isoform test to detect growth hormone doping in sports.

    Science.gov (United States)

    Voss, S C; Giraud, S; Alsayrafi, M; Bourdon, P C; Schumacher, Y O; Saugy, M; Robinson, N

    2013-08-01

    The major objective of this study was to investigate the effects of several days of intense exercise on growth hormone (hGH) testing using the World Anti-Doping Agencies hGH isoform differential immunoassays. Additionally the effects of circadian variation and exercise type on the isoform ratios were also investigated. 15 male athletes performed a simulated nine day cycling stage race. Blood samples were collected twice daily over a period of 15 days (stage race+three days before and after). hGH isoforms were analysed by the official WADA immunoassays (CMZ Assay GmbH). All measured isoform ratios were far below the WADA decision limits for an adverse analytical finding. Changes in the isoform ratios could not be clearly connected to circadian variation, exercise duration or intensity. The present study demonstrates that the hGH isoform ratios are not significantly affected by exercise or circadian variation. We demonstrated that heavy, long term exercise does not interfere with the decision limits for an adverse analytical finding. Copyright © 2013 Elsevier Ltd. All rights reserved.

  15. Collaborative procurement for developing a sustainable campus

    Science.gov (United States)

    Nifa, Faizatul Akmar Abdul; Rahim, Syukran Abdul; Rani, Wan Nurul Mardiah Wan Mohd; Ismail, Mohd. Noorizhar

    2016-08-01

    It is particularly challenging to achieve sustainability in campus universities, where a high volume of users and activities has made it more imperative to promote green buildings that reduce energy and water consumption while having a minimal carbon footprint. At present, the frameworks for sustainable campus have seldom focused on the project procurement method which would improve construction team integration in developing the physical aspect of campus development. Therefore, in response to that challenge, this paper investigates how the delivery team, responsible for the design and construction of a project, can be integrated to work together more efficiently and more using the collaborative procurement method known as partnering. This paper reports part of a previous research and sets the base for ongoing research on the critical factors in partnering for sustainable campus development. The outcome or result of this study will meet and support the requirement for construction, maintenance, and operation process for universities towards sustainable building/campus in the future.

  16. Green related practices for construction procurement

    Science.gov (United States)

    Bidin, Z. A.; Bohari, A. A. M.; Rais, S. L. A.; Saferi, M. M.

    2018-04-01

    Environment degradation issue has been a worldwide problem and various efforts have been done to minimise the problem. Construction sectors are pointed as one of the major contributors to its construction activities. Green-oriented procurement [GP] is considered as an environmental strategy to integrate the environmental practices into the construction delivery. Thus, this paper reviews the concept of GP and the practices related to it. The outcome of this research findings provides a basis for understanding the concept of GP and the further development of GP. The listed GP practices identified from this paper can serve as guidelines for industry practitioners to design, implement, and benchmarking the green practices in their procurement delivery.

  17. Innovative Procurement and Partnerships in Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2011-01-01

    A major study of facilities management best practice covering 36 cases from the Nordic countries in Europe shows, that the most outstanding examples of innovation in FM are initiated from the demand side and involves new forms of procurement with long term contracts. This paper considers in depth......-called operational partnerships with private providers concerning all municipal buildings and sports facilities in parts of a city. Each of the case studies has involved both the client and the provider side of the collaboration. The cases show that an essential element in a successful procurement and partnership...... is that the client allows the providers freedom to plan their activities. Thereby the providers can optimize the use of their productive capacity and utilize their competences with incentives to profit from such improvements. A major challenge is to balance the risks between the client and provider and to create...

  18. Public Procurement: A performance management perspective

    OpenAIRE

    Klevensparr, Johan

    2016-01-01

    Purpose - The purpose of this thesis is to explore what performance indicators that exist within public procurement in defence sector context and how such performance indicators can be categorized.   Methodology - For the purpose of this thesis, an abductive approach was applied. This thesis is characterized as an exploratory multimethod qualitative research, which emphasize a single case study and a comprehensive research literature review. The empirical data was collected using semi-structu...

  19. Socially Responsible Award of the Procurement Contracts

    OpenAIRE

    Hristina Blagoycehva

    2013-01-01

    With the Europe 2020 strategy the EU has set itself, under conditions of a changing world, the goal of becoming an intelligent, sustainable and inclusive economy. Under the current conditions of budget constraints and economic difficulties the conventional mechanisms for promoting social justice and social cohesion are insufficient. Through the inclusion of social criteria in the awarding of public procurement there can be guaranteed the compliance with social insurance legislation, furthered...

  20. Innovation, Procurement and Construction Industry Development

    Directory of Open Access Journals (Sweden)

    Geard de Valence

    2010-12-01

    Full Text Available The implications for analysis of innovation in construction of theoretical developments in industrial organisation are considered in this research, as an attempt to outline a new approach to construction innovation incorporating the ideas found in knowledge based, technology centred models. The paper firstly summarises characteristics of the construction industry, focusing on their effects on innovation, before surveying some of the ideas about the sources of innovation and the expansion and application of knowledge. Construction can be seen as an industry with limited scope for knowledge externalities, where the procurement methods used by the industry’s clients do not pay for innovation. The following discussion uses recent developments in the research on the economics of innovation and industrial organization theory, such as research intensity and the endogenous sunk costs in competitive, fragmented, low research intensity industries. The effects on R&D of procurement methods and on industry structure are discussed, with a focus on the appropriability of innovations and the role of the client on the Heathrow Terminal 5 project. The paper concludes that the procurement methods used for building and construction projects appears to be a determining factor in the level of innovation in the construction industry

  1. Paid organ procurement: pragmatic and ethical viewpoints.

    Science.gov (United States)

    Daar, A S

    2004-09-01

    None of the familiar arguments against paid organ procurement really works. Most arguments spring from revulsion that arises from the abuses of the practice rather than the act itself. This has not stopped official condemnation. However, the evidence we have at present is that such condemnation, aimed at correcting a perceived moral wrong rather than at abuses of a practice (the correction of which might actually bring some moral good), has utterly failed, and many more countries including the United States now harbor paid organ procurement. We can try to develop and articulate a truly compelling moral argument against paid organ procurement or we can try to minimize the harm that comes out of this practice. Since it is unlikely that all countries will agree on a standardized approach in such a muddled field, the best way may be to let every country decide on what is best for itself. Some may want to ban the practice using legislation. Others may want to try regulating the practice, knowing full well that they cannot stop it and that turning a blind eye to the practice, or simply condemning it, does no good whatsoever and actually increases the harm because everything is done underground, with middlemen and mafia-like organizations making a lot of money out of a lot of misery. Some countries may choose to find other, more innovative solutions. We call attention to an important resolution dealing with this subject at the December 2002 ethics and transplantation congress in Munich.

  2. Healthy Food Procurement Policies and Their Impact

    Science.gov (United States)

    Niebylski, Mark L.; Lu, Tammy; Campbell, Norm R. C.; Arcand, Joanne; Schermel, Alyssa; Hua, Diane; Yeates, Karen E.; Tobe, Sheldon W.; Twohig, Patrick A.; L’Abbé, Mary R.; Liu, Peter P.

    2014-01-01

    Unhealthy eating is the leading risk for death and disability globally. As a result, the World Health Organization (WHO) has called for population health interventions. One of the proposed interventions is to ensure healthy foods are available by implementing healthy food procurement policies. The objective of this systematic review was to evaluate the evidence base assessing the impact of such policies. A comprehensive review was conducted by searching PubMed and Medline for policies that had been implemented and evaluated the impact of food purchases, food consumption, and behaviors towards healthy foods. Thirty-four studies were identified and found to be effective at increasing the availability and purchases of healthy food and decreasing purchases of unhealthy food. Most policies also had other components such as education, price reductions, and health interventions. The multiple gaps in research identified by this review suggest that additional research and ongoing evaluation of food procurement programs is required. Implementation of healthy food procurement policies in schools, worksites, hospitals, care homes, correctional facilities, government institutions, and remote communities increase markers of healthy eating. Prior or simultaneous implementation of ancillary education about healthy eating, and rationale for the policy may be critical success factors and additional research is needed. PMID:24595213

  3. Woodfuel procurement strategies of district heating plants

    International Nuclear Information System (INIS)

    Roos, A.; Bohlin, F.; Hektor, B.; Hillring, B.

    2003-01-01

    Woodfuel use in the Swedish district heating sector increased significantly from 1985 to 1999. This study analysed strategies and considerations concerning woodfuel procurement in district heating plants. Priorities and concerns in the industry involved an increased woodfuel share, ambitions to create an environmental image, cost minimisation, awareness about the role of energy policies for fuel choice, improvement of woodfuel quality and the ambition to maintain a competitive woodfuel market with several suppliers. Factor analysis yielded five dimensions in the woodfuel procurement strategies among the district heating companies: (1) increased woodfuel use; (2) import; (3) spot market woodfuel purchases; (4) focus on refined woodfuels; and (5) using price only when deciding whether to use woodfuels or other fuels. Five clusters were defined along the three strategy dimensions (1)-(3). The clusters differed concerning size, experiences from the introduction of woodfuels, perceptions about woodfuels and strategies employed to date. This paper describes different strategies that the district heating companies apply on the woodfuel market. The conclusion is that policies should consider this diversity in procurement strategies, mitigate their negative side-effects and assist to make them cost-effective. (author)

  4. ASME N511-19XX, Standard for periodic in-service testing of nuclear air treatment, heating, ventilating and air conditioning systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    A draft version of the Standard is presented in this document. The Standard covers the requirements for periodic in-service testing of nuclear safety-related air treatment, heating, ventilating, and air conditioning systems in nuclear facilities. The Standard provides a basis for the development of test programs and does not include acceptance criteria, except in cases where the results of one test influence the performance of other tests. The Standard covers general inspection and test requirements, reference values, inspection and test requirements, generic tests, acceptance criteria, in-service test requirements, testing following an abnormal incident, corrective action requirements, and quality assurance. Mandatory appendices provide a visual inspection checklist and four test procedures. Non-mandatory appendices provide additional information and guidance on mounting frame pressure leak test procedure, corrective action, challenge gas substitute selection criteria, and test program development. 8 refs., 10 tabs.

  5. ASME N511-19XX, Standard for periodic in-service testing of nuclear air treatment, heating, ventilating and air conditioning systems

    International Nuclear Information System (INIS)

    1997-01-01

    A draft version of the Standard is presented in this document. The Standard covers the requirements for periodic in-service testing of nuclear safety-related air treatment, heating, ventilating, and air conditioning systems in nuclear facilities. The Standard provides a basis for the development of test programs and does not include acceptance criteria, except in cases where the results of one test influence the performance of other tests. The Standard covers general inspection and test requirements, reference values, inspection and test requirements, generic tests, acceptance criteria, in-service test requirements, testing following an abnormal incident, corrective action requirements, and quality assurance. Mandatory appendices provide a visual inspection checklist and four test procedures. Non-mandatory appendices provide additional information and guidance on mounting frame pressure leak test procedure, corrective action, challenge gas substitute selection criteria, and test program development. 8 refs., 10 tabs

  6. The Informing Needs of Procurement Officers in Israel

    Directory of Open Access Journals (Sweden)

    Yahel Giat

    2017-06-01

    Full Text Available Aim/Purpose: To develop and introduce a questionnaire that investigates the informing needs, information-seeking behavior, and supplier selection of procurement officers in Israel. The questionnaire’s internal consistency reliability is given. Additionally, we describe the demographic description of the procurement officers in Israel. Background: Procurement science is an important field that affects firms’ profits in the private sector and is significant to growth, innovation, sustainability, and welfare in the public sector. There is little research about the informing needs of procurement officers in general and particularly in Israel. Methodology: A quantitative questionnaire that is sent to all the procurement officers in Israel’s procuring association. Contribution: The questionnaire that is developed in this paper may be used by other researchers and practitioners to evaluate the information needs of procurement officers. Findings: The typical procurement officer is male, with a bachelor degree and is digitally proficient. Recommendations for Practitioners: The procuring side can use the questionnaire to develop better tools for obtaining information efficiently. The supplying side can use this knowledge to improve its exposure to potential customers and address its customer’s needs better. Recommendation for Researchers: The questionnaire can address theoretical questions such as how digital literacy affects the procuring process and provide empirical findings about active research areas such as supplier selection and information-seeking behavior. Future Research: Future research will examine the relationship between the various variables and demographic features to understand why specific information needs and information-seeking behaviors arise.

  7. Concerning equipment procurement for NPPs

    International Nuclear Information System (INIS)

    Pana, N.

    2002-01-01

    After a stagnation in investments for nuclear power which extended over a period of 10-15 years, assessments done by energy forecast institutes, as well as, evaluations by UE institutions, OECD, and DOE (USA) point to the conclusion solid and argued that the electric energy of nuclear origin will record a new boost beginning probably with the year 2005. Particular efforts were concentrated upon improving the performances of existing plants and, on the other hand, towards new, evolutionary concepts in nuclear engineering. Advanced equipment for nuclear reactors and plants resulted and were already implemented. In Europe construction of both advanced PWR and BWR type reactors are underway. The paper consider the issues of Romanian nuclear power and presents the prospects for advanced CANDU reactors in connection with the Romania's infrastructure and necessities. The problem of modernizing the equipment and components for NPP is discussed in the context of financing and investment conditions. In conclusion, the share of nuclear power in Romania is expected to rise in order to compensate the decline in fossil fuel thermal power and to better solve the environmental issues

  8. The impact of HTA and procurement practices on the selection and prices of medical devices.

    Science.gov (United States)

    Callea, Giuditta; Armeni, Patrizio; Marsilio, Marta; Jommi, Claudio; Tarricone, Rosanna

    2017-02-01

    Technological innovation in healthcare yields better health outcomes but also drives healthcare expenditure, and governments are struggling to maintain an appropriate balance between patient access to modern care and the economic sustainability of healthcare systems. Health Technology Assessment (HTA) and centralized procurement are increasingly used to govern the introduction and diffusion of new technologies in an effort to make access to innovation financially sustainable. However, little empirical evidence is available to determine how they affect the selection of new technologies and unit prices. This paper focuses on medical devices (MDs) and investigates the combined effect of various HTA governance models and procurement practices on the two steps of the MD purchasing process (i.e., selecting the product and setting the unit price). Our analyses are based on primary data collected through a national survey of Italian public hospitals. The Italian National Health Service is an ideal case study because it is highly decentralized and because regions have adopted different HTA governance models (i.e., regional, hospital-based, double-level or no HTA), often in combination with centralized regional procurement programs. Hence, the Italian case allows us to test the impact of different combinations of HTA models and procurement programs in the various regions. The results show that regional HTA increases the probability of purchasing the costliest devices, whereas hospital-based HTA functions more like a cost-containment unit. Centralized regional procurement does not significantly affect MD selection and is associated with a reduction in the MD unit price: on average, hospitals located in regions with centralized procurement pay 10.1% less for the same product. Hospitals located in regions with active regional HTA programs pay higher prices for the same device (+23.2% for inexpensive products), whereas hospitals that have developed internal HTA programs pay 8

  9. 2016 Status Report on Major Equipment Procurement

    Directory of Open Access Journals (Sweden)

    David Perry

    2017-09-01

    Full Text Available The Department of National Defence made some progress in procurement in 2016 despite obstacles that included a continued drop in spending, the advent of a new federal Liberal government and uncertainty over the outcome of the Defence Policy Review. Four trends affected defence acquisitions in 2016. These include an ongoing slippage in recapitalizing the Canadian Armed Forces, some encouraging moves made on the shipbuilding and fighter jet files, mixed progress on implementing the 2014 Defence Procurement Strategy, and uncertainty over the Defence Policy Review. It is also too early to tell how the Trudeau government’s Policy on Results, known as the “deliverology” approach, will play out for defence procurement. However, Budget 2016’s major focus was not on defence, and it shifted some funding for capital equipment to a new endpoint of 2045. This suggests that delay in the overall defence procurement program continues. While the Liberals kept their pledge to make investment in the Royal Canadian Navy a priority, they also made good last year on a negative promise – not to purchase the F-35 stealth fighter bomber. However, further slowing things is the Liberals’ refusal to launch a competition to replace it until the Defence Policy Review is published. The government has made this situation more fraught with its intention to buy 18 Boeing Super Hornet fighter jets as interim aircraft, since Liberal policy requires the Royal Canadian Air Force to be capable of meeting both NORAD’s and NATO’s operational needs simultaneously. Prior to the release of the new defence policy, both the interim and permanent fighter aircraft projects lacked adequate funding. They were among several large projects that have been approved, but have not yet moved to the contract stage, and whose budgets were inadequate to move forward. Adding to this mix is the fact that a government-wide effort initiated in 2014 to streamline the defence procurement

  10. Review Over a 3-Year Period of European Union Proficiency Tests for Detection of Staphylococcal Enterotoxins in Food Matrices.

    Science.gov (United States)

    Nia, Yacine; Mutel, Isabelle; Assere, Adrien; Lombard, Bertrand; Auvray, Frederic; Hennekinne, Jacques-Antoine

    2016-04-13

    Staphylococcal food poisoning outbreaks are a major cause of foodborne illnesses in Europe and their notifications have been mandatory since 2005. Even though the European regulation on microbiological criteria for food defines a criterion on staphylococcal enterotoxin (SE) only in cheese and dairy products, European Food Safety Authority (EFSA) data reported that various types of food matrices are involved in staphylococcal food poisoning outbreaks. The European Screening Method (ESM) of European Union Reference Laboratory for Coagulase Positive Staphylococci (EURL CPS) was validated in 2011 for SE detection in food matrices and is currently the official method used for screening purposes in Europe. In this context, EURLCPS is annually organizing Inter-Laboratory Proficiency Testing Trials (ILPT) to evaluate the competency of the European countries' National Reference Laboratories (NRLs) to analyse SE content in food matrices. A total of 31 NRLs representing 93% of European countries participated in these ILPTs. Eight food matrices were used for ILPT over the period 2013-2015, including cheese, freeze-dried cheese, tuna, mackerel, roasted chicken, ready-to-eat food, milk, and pastry. Food samples were spiked with four SE types (i.e., SEA, SEC, SED, and SEE) at various concentrations. Homogeneity and stability studies showed that ILPT samples were both homogeneous and stable. The analysis of results obtained by participants for a total of 155 blank and 620 contaminated samples allowed for evaluation of trueness (>98%) and specificity (100%) of ESM. Further to the validation study of ESM carried out in 2011, these three ILPTs allowed for the assessment of the proficiency of the NRL network and the performance of ESM on a large variety of food matrices and samples. The ILPT design presented here will be helpful for the organization of ILPT on SE detection by NRLs or other expert laboratories.

  11. Review Over a 3-Year Period of European Union Proficiency Tests for Detection of Staphylococcal Enterotoxins in Food Matrices

    Directory of Open Access Journals (Sweden)

    Yacine Nia

    2016-04-01

    Full Text Available Staphylococcal food poisoning outbreaks are a major cause of foodborne illnesses in Europe and their notifications have been mandatory since 2005. Even though the European regulation on microbiological criteria for food defines a criterion on staphylococcal enterotoxin (SE only in cheese and dairy products, European Food Safety Authority (EFSA data reported that various types of food matrices are involved in staphylococcal food poisoning outbreaks. The European Screening Method (ESM of European Union Reference Laboratory for Coagulase Positive Staphylococci (EURL CPS was validated in 2011 for SE detection in food matrices and is currently the official method used for screening purposes in Europe. In this context, EURLCPS is annually organizing Inter-Laboratory Proficiency Testing Trials (ILPT to evaluate the competency of the European countries’ National Reference Laboratories (NRLs to analyse SE content in food matrices. A total of 31 NRLs representing 93% of European countries participated in these ILPTs. Eight food matrices were used for ILPT over the period 2013–2015, including cheese, freeze-dried cheese, tuna, mackerel, roasted chicken, ready-to-eat food, milk, and pastry. Food samples were spiked with four SE types (i.e., SEA, SEC, SED, and SEE at various concentrations. Homogeneity and stability studies showed that ILPT samples were both homogeneous and stable. The analysis of results obtained by participants for a total of 155 blank and 620 contaminated samples allowed for evaluation of trueness (>98% and specificity (100% of ESM. Further to the validation study of ESM carried out in 2011, these three ILPTs allowed for the assessment of the proficiency of the NRL network and the performance of ESM on a large variety of food matrices and samples. The ILPT design presented here will be helpful for the organization of ILPT on SE detection by NRLs or other expert laboratories.

  12. ANALYSIS OF THE FOREIGN GOVERNMENT AND CORPORATE PROCUREMENT MANAGEMENT EXPERIENCE

    Directory of Open Access Journals (Sweden)

    Vladimir Vladimirovich Savchenko

    2016-01-01

    Full Text Available This article presents a synthesis of the experience of foreign government and corporate procurement management. Set out key aspects of the organization of procurement for government and corporate needs, disclosed issues of centralization and decentralization of procurement, as well as given clarifi cation of the concept of "procurement management system" and structured the main elements that make up this system. The purpose / goal. The purpose of the work is to study the nature and characteristics of the functioning of government and corporate experience in procurement management, identifying problems and prospects of its development. Methodology. To perform this work were used legal, comparative and statistical analysis methods. Results. As part of the presentation of the present article the author has examined the nature, objectives and stages of public and corporate procurement management.

  13. Advanced accelerator test facility-Final report for the period 9/1/2010 - 8/31/2013

    Energy Technology Data Exchange (ETDEWEB)

    Hirshfield, Jay [Yale Univ., New Haven, CT (United States)

    2014-10-27

    This final report summarizes results achieved in the Beam Physics Laboratory at Yale University during the period 9/1/2010 – 8/31//2013, under DoE grant DE-FG02-07 ER 41504. During the period covered by this report, notable progress in technical consolidation of facilities in the Yale Beam Physics Laboratory has occurred; and theory, design, and fabrication for future experiments have been carried out. In the period covered by this grant, 29 scientific publications based on this work and related topics have appeared in the archival literature. Titles, authors, and citations are listed in Section V of this report.

  14. Public Procurement and the Development of the Swedish Telecommunications Market

    OpenAIRE

    Lindskog, Helena

    2008-01-01

    This thesis describes and analyses public procurement and its processes in general against the framework of industrial marketing and purchasing. In particular, it focuses on the public procurement of telecommunications (“telecom”) and its effects on the de-monopolization and development of the Swedish telecom market based on empirical material from three case studies, interviews and publicly available written sources. Public procurement is a significant part of any country’s economy. There is...

  15. Routines and Communities of Practice in Public Environmental Procurement Processes

    OpenAIRE

    Larsen, Katarina; Svane, Örjan

    2005-01-01

    Environmental procurement has received increasing attention as a policy tool promoting change towards sustainable consumption and production. The successful implementation of public environmental procurement policy requires the establishment of new routines for user-producer-supplier relationships that enable the integration of environmental aspects. The aim of the study is to analyse the roles of different communities of practice and learning patterns in environmental procurement processes. ...

  16. Improving the effectiveness of public entities procurement practices

    OpenAIRE

    2013-01-01

    M. Com. (Business Management) The media and the Auditor General have extensively reported on the ineffective and unethical conduct of public sector employees regarding the procurement of goods and services. The Auditor General’s report demonstrates that there is evidence that public sector procurement processes are less than adequate to achieve constitutional procurement goals, which are to conduct processes that are fair, equitable, transparent, competitive and cost-effective The delivery...

  17. Considerations regarding procurement activities in institutions of local authority

    OpenAIRE

    Mãdãlina ALBU

    2013-01-01

    Objectives which they propose a public authority requires, among others, providing the necessary resources, including the material occupy a large proportion. This is done through the public procurement system. The procurement is part of the legal and economic reality of the Romanian society and covers all rules and actions on public spending and the application launched by public bodies meets the proposed offer of an operator. This paper presents an analysis of the public procurement system i...

  18. Sustainable Public Procurement : a new policy paradigm in France ?

    OpenAIRE

    Le Velly, Ronan

    2010-01-01

    The purpose of this paper is to explore the “new paradigm” of sustainable public procurement in France, that is, its cognitive and normative frameworks. Firstly, the author shows that the newness of this paradigm has to do with the identification of sustainable procurement as a stake in its own right. Next, he shows that the good practices associated with sustainable procurement are also new (close relationships with suppliers, systematic thought about what is needed, innovative methods of co...

  19. Opportunities for public procurement procedures efficiency and optimization improvement

    OpenAIRE

    Junevičius, Algis; Ereminaitė, Simona

    2010-01-01

    Public procurement is one of the most actual problems of economics and a potential instrument of successful public policy, which can control money flows and manipulate the appearance of corruption opportunities. Procurement practices are relatively new in the public sector, but everyone knows the complicated regulation and coordination of this process. Despite the fact that society often discus about public procurement problems, the regulation of this process requires an in-depth evaluation b...

  20. Economic risks of the system of state and municipal procurement

    Directory of Open Access Journals (Sweden)

    Belokrylova Olga, S.

    2015-12-01

    Full Text Available In the paper the audit of economic risks at all stages of procurement for state and municipal needs from both customers and bidders is carried out on the basis of the implementation of the integrated approach . Stages in the procurement under a single contract system, which is characterized by the high economic risks are planning, supplier selection, conclusion and execution of the contract. A number of the measures according to the localization of economic risks are offered, in particular the implementation of compliance programs, which institutionalize the compliance by the organization, anti-corruption legislation; increasing qualification of specialists in public procurement and increased control through centralization of procurement.

  1. Challenges of public procurement in EU funded projects

    Directory of Open Access Journals (Sweden)

    Marko Šostar

    2017-01-01

    Full Text Available Membership in the European Union implies adjustment of EU projects to the rules of Structural Funds, but also adoption of legal regulations, thus influencing the process of implementation of the public procurement in EU funded projects. Each successful applicant who expressed the need for procurement of goods, services and works of a certain value, must respect the principles of public procurement. Irregularities in the procurement process can lead to the failure of returning the EU funds even several years after the end of the project. Therefore, the knowledge and proper implementation of public procurement is the main precondition for the correct implementation of each project. In order to obtain information about the current absorption capacity of the public procurement liable parties, and to identify key obstacles that stakeholders face in procurement procedures, the research was conducted by surveying 30 entities that are subject of public procurement in Croatia. Research results imply the poor quality of public procurement in the implemented projects, which often results in financial corrections, disapproving project reports, etc.

  2. THE EFFECTIVENESS OF BUDGET ALLOCATION IN PUBLIC PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Irina Yu. Fedorova

    2015-01-01

    Full Text Available This article deals with the problem of budget allocation in the state order inRussia. Assesses the effectiveness of the financial mechanism of the public procurement business entities, purchasing activities are regulated by Federal Law №44-FZ and №223-FZ. The dynamics of financing the procurement process and reveal its features by using the most common methods of procurement through competitive bidding and without bidding. Identifies the causes of inefficient spending budget as a result of the non-competitive procurement methods by certain categories of business entities. 

  3. Playing the game of public procurement of innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Given the emergence and diffusion of policies aiming at promoting the utilisation of public procurement as an innovation policy instrument, it is remarkable that very little scholarly attention has been given to the teaching of public procurement of innovation. This paper sets out to contribute...... towards mending this gap, by discussing some considerations made in the context of the development and set up of a university course in public procurement of innovation. A major challenge for such an endeavour is how to bring the complexities of real-life public procurement into a university class...

  4. E-Procurement and the U.S. Military

    National Research Council Canada - National Science Library

    Doe, David

    2002-01-01

    .... Meanwhile, companies worldwide are undergoing transformation as they harness the power of Internet-enabled tools, One significant aspect of industry's transformation is electronic or e-procurement...

  5. 75 FR 1355 - Procurement List Additions and Deletions

    Science.gov (United States)

    2010-01-11

    .../Location: Janitorial Services, Jamestown Service Center, 8430 Country Club Street, Jamestown, ND. NPA..., the following products and services are deleted from the Procurement List: Products Business Cards NSN...

  6. Friction testing for abnormal wet weather accident locations : all Louisiana districts for the period 1995 : technical assistance report.

    Science.gov (United States)

    2000-06-01

    This report contains the results of friction testing conducted by the pavement/systems group of the Louisiana Transportation Research Center (LTRC) based on accidents occurring in 1995. This testing is conducted on all Louisiana locations which have ...

  7. A Procurement Performance Model for Construction Frameworks

    Directory of Open Access Journals (Sweden)

    Terence Y M Lam

    2015-07-01

    Full Text Available Collaborative construction frameworks have been developed in the United Kingdom (UK to create longer term relationships between clients and suppliers in order to improve project outcomes. Research undertaken into highways maintenance set within a major county council has confirmed that such collaborative procurement methods can improve time, cost and quality of construction projects. Building upon this and examining the same single case, this research aims to develop a performance model through identification of performance drivers in the whole project delivery process including pre and post contract phases. A priori performance model based on operational and sociological constructs was proposed and then checked by a pilot study. Factor analysis and central tendency statistics from the questionnaires as well as content analysis from the interview transcripts were conducted. It was confirmed that long term relationships, financial and non-financial incentives and stronger communication are the sociological behaviour factors driving performance. The interviews also established that key performance indicators (KPIs can be used as an operational measure to improve performance. With the posteriori performance model, client project managers can effectively collaboratively manage contractor performance through procurement measures including use of longer term and KPIs for the contract so that the expected project outcomes can be achieved. The findings also make significant contribution to construction framework procurement theory by identifying the interrelated sociological and operational performance drivers. This study is set predominantly in the field of highways civil engineering. It is suggested that building based projects or other projects that share characteristics are grouped together and used for further research of the phenomena discovered.

  8. Postmortem sperm procurement: a legal perspective.

    Science.gov (United States)

    Kahan, S E; Seftel, A D; Resnick, M I

    1999-06-01

    Postmortem sperm procurement with subsequent artificial insemination has become a technically feasible method for posthumous conception. A variety of legal questions exist involving the rights and relationships of the deceased, his family and his issue. We addressed these questions and designed a workable protocol for postmortem sperm procurement. MEDLINE, WESTLAW and LEXIS medical literature, and case law searches were conducted. United States and international case law, United States (federal and state) statutes, Uniform Law Commissions Acts, and law review commentaries and articles were reviewed. While postmortem sperm procurement is being requested throughout the United States, no standard protocol or procedural guidelines have been established by federal or state statute. Furthermore, the courts have not yet addressed this specific scenario in reported case law. Statutes and case law do address related factual scenarios and issues, including property rights in human bodies, rules governing transplantation of human organs/body parts, rights of parties in in vivo sperm bank donations and responsibilities of parents to the conceptus of artificial insemination. A workable protocol can be established by analyzing case law and statutes addressing factually similar scenarios. Urologists must focus on the express intent of the decedent and limit any postmortem sperm retrieval to the specific requests made by the decedent. Decedent requests should be documented in writing. The decedent must be competent and of majority age. In the absence of decedent expressed affirmative directive calling for sperm retrieval, no other relative or guardian may authorize this retrieval. Issues regarding the legitimacy and inheritance rights of the conceptus will most consistently be addressed when explicitly provided for in the will of the decedent.

  9. Applying Petroleum the Pressure Buildup Well Test Procedure on Thermal Response Test—A Novel Method for Analyzing Temperature Recovery Period

    Directory of Open Access Journals (Sweden)

    Tomislav Kurevija

    2018-02-01

    Full Text Available The theory of Thermal Response Testing (TRT is a well-known part of the sizing process of the geothermal exchange system. Multiple parameters influence the accuracy of effective ground thermal conductivity measurement; like testing time, variable power, climate interferences, groundwater effect, etc. To improve the accuracy of the TRT, we introduced a procedure to additionally analyze falloff temperature decline after the power test. The method is based on a premise of analogy between TRT and petroleum well testing, since the origin of both procedures lies in the diffusivity equation with solutions for heat conduction or pressure analysis during radial flow. Applying pressure build-up test interpretation techniques to borehole heat exchanger testing, greater accuracy could be achieved since ground conductivity could be obtained from this period. Analysis was conducted on a coaxial exchanger with five different power steps, and with both direct and reverse flow regimes. Each test was set with 96 h of classical TRT, followed by 96 h of temperature decline, making for almost 2000 h of cumulative borehole testing. Results showed that the ground conductivity value could vary by as much as 25%, depending on test time, seasonal period and power fluctuations, while the thermal conductivity obtained from the falloff period provided more stable values, with only a 10% value variation.

  10. EXAMINATION OF ETHICAL PROCUREMENT THROUGH ENTERPRISE EXAMPLES

    Directory of Open Access Journals (Sweden)

    Beáta Sz. G. Pató

    2016-06-01

    Full Text Available Today’s business world is affected by the 21st century’s processes, like globalization, fluent online attendance, digitalization and their direct consequence depersonalisation. The authors are motivated by these facts and want to vivify the „old fashioned” correct business models and find the indispensable parameter of the well-functioning economy, in one word today’s equivalent of „honorable gentlemen”. The assumed key to success could be useful for the for-profit sector because not only profit can be the impelling in the professional life of a corporation. The human value added is one of the most important keystones of thrift. The aim to establish a balance between economic and ethical behaviour of corporations has been enounced serving the interest of all participants, consumers, corporations and society. The before natural thought values seem nowadays to turn into something different or to be neglected. As a consequence the question has been raised, if society has the force to establish and improve Ethics, will it be able to destroy it as well?! The main focus of the research is therefore the mapping of criteria and marks which belong to on the competitive market successful enterprises whose procurement decisions are ethical as well. These marks can be formal or informal. The results of the research show well that there are parameters of a company, for example, a code of conduct within guidelines concerning the procurement or procedure manuals in which also ethical issues appear in a formal way. From another point of view there are informal signs like customs arising from the corporate culture, daily routine or just human behaviour and convincement of the management and procurement employees that also support the ethical performance of the company. The results of the research can serve as best practice for the other enterprises too in their daily appearance on the market. Particularly in that area the company’s most important

  11. The New EU Public Procurement Directives

    DEFF Research Database (Denmark)

    , transparency requirements, competitive dialogue, framework agreements, use of social and environmental criteria, Partnering and Public Private Partnerships and concessions. This book contains contributions based on presentations given by a number of the international and Danish speakers at the conference.......31 March 2004 the EU adopted two new public procurement directives: one for the public sector (2004/18/EC) and one for utilities (2004/17/EC). The new directives aim at simplification and modernisation of the previously existing directives including adaptation to electronic purchasing techniques...

  12. Debating Organ Procurement Policy Without Illusions.

    Science.gov (United States)

    Hippen, Benjamin

    2015-10-01

    In this perspective, I review and critique claims that the transplant waiting list overstates the demand for kidneys and correct a few mischaracterizations of some structural barriers to increasing rates of transplantation. The solutions to the shortage of organs proffered by opponents of financial incentives fail to account for a panoply of clinical, regulatory, and financial realities of transplantation centers in the United States in ways that undermine the thesis that a trial of financial incentives for organ procurement is not warranted at this time. I conclude with some personal pessimistic reflections on the progress of this debate. Copyright © 2015 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  13. Stopping Illicit Procurement: Lessons from Global Finance

    Energy Technology Data Exchange (ETDEWEB)

    Hund, Gretchen; Kurzrok, Andrew J.

    2014-06-19

    Government regulators and the financial sector cooperate to combat money laundering and terrorist financing. This information-sharing relationship is built upon a strong legislative foundation and effective operational procedures. As with money-laundering and terrorist financing, halting the illicit procurement of dual-use commodities requires close coordination between government and industry. However, many of the legal and operational features present in financial threat cooperation do not exist in the export control realm. This article analyzes the applicability of financial industry cooperative measures to nonproliferation.

  14. 48 CFR 9904.406 - Cost accounting standard-cost accounting period.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard-cost accounting period. 9904.406 Section 9904.406 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT...

  15. Can voluntary pooled procurement reduce the price of antiretroviral drugs? a case study of Efavirenz.

    Science.gov (United States)

    Kim, Sung Wook; Skordis-Worrall, Jolene

    2017-05-01

    : A number of strategies have aimed to assist countries in procuring antiretroviral therapy (ARV) at lower prices. In 2009, as the Global Fund to Fight AIDS, Tuberculosis and Malaria (GFATM) commenced a voluntary pooled procurement scheme, however, the impact of the scheme on ARV prices remains uncertain. This study aims to estimate the effect of VPP on drug prices using Efavirenz as a case study. This analysis uses WHO Global price report mechanism (GPRM) data from 2004 to 2013. Due to the highly skewed distribution of drug Prices, a generalized linear model (GLM) was used to conduct a difference-in-difference estimation of drug price changes over time. These analyses found that voluntary pooled procurement reduced both the ex-works price of generic Efavirenz and the incoterms price by 16.2 and 19.1%, respectively ( P <  0.001) in both cases). The year dummies were also statistically significant from 2006 to 2013 ( P <  0.001), indicating a strong decreasing trend in the price of Efavirenz over that period. Voluntary pooled procurement significantly reduced the price of 600 mg generic Efavirenz between 2009 and 2013. Voluntary pooled procurement therefore offers a potentially effective strategy for the reduction in HIV drug prices and the improvement of technical efficiency in HIV programming. Further work is required to establish if these findings hold also for other drugs. © The Author 2017. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com

  16. Did a local distribution company procure prudently during the California electricity crisis?

    International Nuclear Information System (INIS)

    Woo, C.-K.; Lloyd, Debra; Clayton, William

    2006-01-01

    To manage cost risk, prudent procurement of electric power requires that some portion of a buyer's energy demand be met through long-term contracting. Under cost-of-service regulation or performance-based regulation, a local distribution company (LDC) should be allowed to fully recover all prudently incurred power procurement costs. However, the regulatory test of prudence is an ex post review with the threat of disallowance. This paper presents an economic analysis of procurement prudence involving a small LDC, Bear Valley Electric Service (BVES), which serves a resort area in Southern California. The key findings are: (a) high and volatile prices and rolling blackouts characterized the market environment faced by the owner of BVES, Southern California Water Company (SCWC), at its signing of a 5-year fixed price contract; (b) SCWC was a price-taker with no incentive to act imprudently; (c) the contract was obtained via a competitive bidding process; (d) the contract price was comparable to the benchmark price of contemporaneous contracts; (e) the fixed price contract was economic when compared to available alternatives; and (f) despite (a)-(e), a negotiated settlement with the state regulator and a large user resulted in substantial disallowance. The policy implication is that a regulator should approve a prudent procurement plan proposed by an LDC to remove the unreasonable risk of an ex post review. If the LDC strictly adheres to the plan, the resulting electricity purchases are per se prudent and should entitle the LDC to full cost recovery

  17. Use of other industry standards to facilitate the procurement and dedication of commercial-grade items

    International Nuclear Information System (INIS)

    Beard, R.L.; Rosch, F.C.; Sanwarwalla, M.H.; Tjernlund, R.M.

    1994-01-01

    Nuclear utilities are embarking on innovative approaches for reducing costs in all aspects of engineering, operation, maintenance, and procurement to produce power cheaply and efficiently and remain competitive with other power producers. In the area of procurement, utilities are increasingly obtaining commercial-grade items for use in safety-related applications. This trend is occurring because of lack of suppliers capable or willing to meet 10 CFR 21 and 10 CFR 50 App. B requirements and because of the absence of original equipment suppliers or the spiraling cost associated with procuring items' basic components safety-related from original suppliers. Utilities have been looking at ways to reduce procurement costs. One promising means to reduce costs is to utilize information provided in other nonnuclear industry standards regarding the specification, control, manufacture, and acceptance of the critical characteristics required of the item to perform its design function. A task force was instituted under the sponsorship of the Electric Power Research Institute to investigate the feasibility of using items manufactured to other industry standards in nuclear safety-related applications. This investigation looked at a broad spectrum of available industry standards pertaining to the design, function, manufacture, and testing of items and determined that some standards are more useful than others. This paper discusses the results of this investigation and how credit from the controls exercised for items manufactured to certain existing industry standards can be taken to minimize dedication costs

  18. The World Bank Group and Public Procurement--An Independent Evaluation : Volume 2: Achieving Development Effectiveness through Procurement in Bank Financial Assistance

    OpenAIRE

    Independent Evaluation Group

    2014-01-01

    Good public procurement practices are a major determinant of the effectiveness of public expenditure. On behalf of their citizens, governments typically spend as much as 5-20 percent of their gross domestic product on procurement of goods and services, and effective procurement policies enable better use of government budgets. Good national procurement practices are therefore an essential ...

  19. Fracture evaluation tests

    International Nuclear Information System (INIS)

    Robinson, G.C.

    1991-01-01

    In this report period, efforts have concentrated on defining the requirements for shallow-flaw beam testing. Analyses have been made to envelope the significant parameters for both deep- and shallow-flaw beams for three-point loading; that is, load to initiation of a frangible flaw, load to plastic collapse, LLD, and CMOD. An assessment was made of facilities capable of performing the tests identified by the parametric analyses discussed above. Two testing machines were identified for performing the scoped test series, the first a 550-kip Instron machine assigned to the Pressure Vessel Technology Section located in Building 9204-1 at the Y-12 Plant and the second a 220-kip MTS machine assigned to a mechanical testing group located at the K-25 Site. An existing bend test fixture previously used in the HSST clad plate test series is being modified for use in testing beams under other sponsorship but will be available for shared usage with the HSST shallow-flaw beam testing activities. To prevent the shared usage from having an adverse impact on the logistics of the HSST Program, the decision was made to procure a bend test fixture tailored specifically to serve the shallow flaw beam test series. A specification was prepared and procurement initiated. A survey is in progress for determining sources and costs of displacement-measuring instrumentation from both foreign and domestic sources. It appears that existing direct current displacement transducers available to the HSST Program may be adequate for the LLD measurements. These devices will be employed in the shakedown tests that are planned. A safety and environmental survey assessment for the beam testing conforming to the revised DOE rules has been prepared and approved

  20. NS OTTO HAHN - test report no. 27 for the period from 5-8-1976 to 25-8-1977

    International Nuclear Information System (INIS)

    1977-01-01

    Several voyages to Rio de Janeiro, Montevideo, and Durban are reported on as well as stays in the shipyard. In these reports, the programme of operation is explained, and the technical incidents are described. For the period between August 25th, 1976, and June 17th, 1977, the development of thermal power is given in the form of power histograms. (UA) [de

  1. US utility uranium procurement: goals and tactics

    International Nuclear Information System (INIS)

    Warner, Jim

    1991-01-01

    This paper summarizes and attempts to explain the results of a survey sent to 37 US utilities asking them two questions: What are the goals of your uranium procurement strategy? and what are the tactics you use in achieving those goals? The results are presented in a summary fashion to protect individual company proprietary information. This paper is directed particularly to non-US uranium market participants as an aid to gain further insight into ''the US market'' and to understand how the potential cumulative market responses of US utilities may influence their procurement plans. Out of 37 utilities surveyed, 25 responded. Some utilities were interviewed over the telephone. Some responses were as short as one paragraph, while others were 1 to 5 pages in length. The format was chosen to encourage original responses. The range of responses could be used in the future as a basis for a multiple-choice type survey to form a more statistically representative sample. The responses are summarized for each of the two questions. (author)

  2. The role of procurement in liabilities management

    International Nuclear Information System (INIS)

    Nicol, R.D.

    1998-01-01

    The new United Kingdom Atomic Energy Authority (UKAEA) has as its primary purpose the management of the liabilities left from the nuclear R and D programme. When it was set up in its present form in 1994 (as UKAEA Government Division) it had as its core functions programme management and procurement. It aimed to be involved in project implementation and operations only in so far as it needed to be for purposes of control as nuclear site licensee, or where otherwise this represented best value for money for the taxpayer. This paper describes how the clear definition and split of client and contractor roles has enabled UKAEA to promote the development of a competitive market in decommissioning, to the benefit of the taxpayer and industry. The importance of procurement at the various stages of planning and implementation are explained, along with some of the initiatives UKAEA has taken to improve client-contractor relationships. It is argued that UKAEA's approach has helped to define the boundaries of what is permissible in contractorization within the terms of a nuclear site licence. (author)

  3. The diagnosis of symptomatic acute antiretroviral syndrome during the window period with antigen/antibody testing and HIV viral load

    Directory of Open Access Journals (Sweden)

    Daniel O. Griffin

    Full Text Available Despite much focus on moving toward a cure to end the epidemic human immunodeficiency virus (HIV epidemic there are still thousands of new infections occurring every year in the United States. Although there is ongoing transmission of HIV in the United States and a growing population of people living with HIV, the acute presentation of HIV infection can be challenging to diagnose and is often not considered when patients present to healthcare providers. Although in certain states there are HIV testing laws that require that all persons between the ages of 13 and 64 be offered HIV testing in an opt-out approach, many patient presenting with an acute illness, that would warrant diagnostic testing for HIV, leave without having an HIV test performed for either diagnostic or screening purposes.We describe the case of a woman who presented to medical attention with symptoms later confirmed to be due to acute HIV infection. She was initially discharged from the hospital and only underwent HIV testing with confirmation of her diagnosis after readmission. We describe the algorithm where fourth generation testing combined with HIV viral load testing allowed for the diagnosis of acute HIV prior to the development of a specific immunoglobulin response. Consideration of this diagnosis, improved HIV screening, and understanding of the use of antigen/antibody screening tests, combined with Multispot and HIV viral RNA detection, when appropriate, can allow for early diagnosis of HIV before progression of disease and before undiagnosed patient spread the infection to new contacts.

  4. 78 FR 75912 - Procurement List; Addition and Deletion

    Science.gov (United States)

    2013-12-13

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Addition to and deletion from the Procurement List. SUMMARY: This action adds a service to the Procurement...: General Services Administration, Fort Worth, TX Deletion On 11/1/2013 (78 FR 65618), the Committee for...

  5. 78 FR 27369 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2013-05-10

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to and Deletion from the Procurement List. SUMMARY: This action adds products to the Procurement..., Philadelphia, PA. Deletion On 4/5/2013 (78 FR 20622-20623), the Committee for Purchase From People Who Are...

  6. 76 FR 5142 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2011-01-28

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement.... Contracting Activity: Department of Transportation, Federal Aviation Administration, Jamaica, NY. Deletion On...

  7. 78 FR 21348 - Procurement List; Additions and Deletions; Recissions

    Science.gov (United States)

    2013-04-10

    ... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions and Deletions; Recissions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Rescission of Previous Procurement List Decision. SUMMARY: The Committee for Purchase...

  8. Develop risk-based procurement management tools for SMEs

    NARCIS (Netherlands)

    Staal, Anne; Hagelaar, Geoffrey; Walhof, Gert; Holman, Richard

    2016-01-01

    This paper provides guidance for developing risk-based management tools to improve the procurement (purchasing) performance of SMEs. Extant academic literature only offers little support on developing such tools and does not consider the wide variety of SMEs. The paper defines a procurement tool for

  9. 20 CFR 638.806 - Property management and procurement.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Property management and procurement. 638.806 Section 638.806 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS... management and procurement. The Job Corps Director shall develop procedures to establish and maintain a...

  10. 75 FR 36363 - Procurement List: Proposed Additions and Deletions

    Science.gov (United States)

    2010-06-25

    ... Homeland Security, U.S. Coast Guard, Washington, DC Service Type/Location: Laundry Service, USDA National... proposing to add products and services to the Procurement List that will be furnished by nonprofit agencies... Government identified in this notice will be required to procure the products and services listed below from...

  11. 76 FR 14942 - Procurement List; Additions and Deletions

    Science.gov (United States)

    2011-03-18

    ... DFAC. Service Type/Location: Laundry & Dry Cleaning Service, F.E. Warren, AFB, WY. NPA: Goodwill... Service Type/Location: Laundry Service, Atlanta VA Medical Center, Decatur, GA. NPA: GINFL Services, Inc...: Additions to and deletions from the Procurement List. SUMMARY: This action adds services to the Procurement...

  12. 75 FR 41449 - Procurement List Additions and Deletion

    Science.gov (United States)

    2010-07-16

    ... Customs and Border Protection, Office of Procurement, Washington, DC Service Type/Locations: Laundry.../Locations: Laundry Service, Naval Hospital System, 2800 Child Street, Jacksonville, FL NPA: GINFL Services...: Additions to and deletion from the Procurement List. SUMMARY: This action adds products and services to the...

  13. 76 FR 66913 - Procurement List Proposed Additions and Deletions

    Science.gov (United States)

    2011-10-28

    ...&M, Philadelphia, PA. Service Service Type/Location: Industrial Laundry Service, Bureau of Engraving... proposing to add products and service to the Procurement List that will be furnished by nonprofit agencies... identified in this notice will be required to procure the products and service listed below from nonprofit...

  14. 78 FR 53733 - Procurement List Additions and Deletions

    Science.gov (United States)

    2013-08-30

    .../Location: Industrial Laundry Service, Bureau of Engraving and Printing, 9000 Blue Mound Road, Fort Worth...: Additions to and Deletions from the Procurement List. SUMMARY: This action adds products and services to the... severe disabilities, and deletes services from the Procurement List previously provided by such agencies...

  15. 22 CFR 226.40 - Purpose of procurement standards.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Purpose of procurement standards. 226.40 Section 226.40 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.40 Purpose...

  16. 48 CFR 1323.404-70 - DOC affirmative procurement program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false DOC affirmative procurement program. 1323.404-70 Section 1323.404-70 Federal Acquisition Regulations System DEPARTMENT OF..., OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Use of Recovered Materials 1323.404-70 DOC affirmative procurement...

  17. The impact of preferential procurement in South African construction ...

    African Journals Online (AJOL)

    The impact of preferential procurement in South African construction industry. ... The outcome of this study shows that there are problems in the implementation of PPPFA during tendering and procurement processes and procedures for achieving success in government projects. Key words: HDIs, PPPFA, Policies, ...

  18. Malawi : Country Procurement Assessment Report, Volume 3. Executive Summary

    OpenAIRE

    World Bank

    2004-01-01

    The Malawi Country Procurement Assessment Report is a joint undertaking between the Malawi Government and the World Bank to analyze the country procurement system and recommend appropriate actions to improve the efficiency, economy and transparency of the system. This report is divided into (a) an Executive Summary, (b) Main Report on Findings and Recommendations, and (c) Annexes. Since th...

  19. Malawi : Country Procurement Assessment Report, Volume 2. Details and Annexes

    OpenAIRE

    World Bank

    2004-01-01

    The Malawi Country Procurement Assessment Report is a joint undertaking between the Malawi Government and the World Bank to analyze the country procurement system and recommend appropriate actions to improve the efficiency, economy and transparency of the system. This report is divided into (a) an Executive Summary, (b) Main Report on Findings and Recommendations, and (c) Annexes. Since th...

  20. Ghana : Country Procurement Assessment Report, Volume 2. Main Report

    OpenAIRE

    World Bank

    2003-01-01

    This report highlights a broad array of poor procedures and practices throughout the tendering and contract management process, which have been the cause of many of Ghana's public procurement problems, and where most of the leakages in public procurement funding occur and substantial savings could be realized. Most of the procedural anomalies are now being corrected by the Public Procureme...

  1. Ghana : Country Procurement Assessment Report, Volume 5. Annex 9

    OpenAIRE

    World Bank

    2003-01-01

    This report highlights a broad array of poor procedures and practices throughout the tendering and contract management process, which have been the cause of many of Ghana's public procurement problems, and where most of the leakages in public procurement funding occur and substantial savings could be realized. Most of the procedural anomalies are now being corrected by the Public Procureme...

  2. Ghana : Country Procurement Assessment Report, Volume 1. Executive Summary

    OpenAIRE

    World Bank

    2003-01-01

    This report highlights a broad array of poor procedures and practices throughout the tendering and contract management process, which have been the cause of many of Ghana's public procurement problems, and where most of the leakages in public procurement funding occur and substantial savings could be realized. Most of the procedural anomalies are now being corrected by the Public Procureme...

  3. Ghana : Country Procurement Assessment Report, Volume 4. Annex 8

    OpenAIRE

    World Bank

    2003-01-01

    This report highlights a broad array of poor procedures and practices throughout the tendering and contract management process, which have been the cause of many of Ghana's public procurement problems, and where most of the leakages in public procurement funding occur and substantial savings could be realized. Most of the procedural anomalies are now being corrected by the Public Procureme...

  4. Strengthening Procurement Systems in Latin America and the ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... and the development of MSMEs and electronic commerce. Information and Communication Technologies (ICTs) are key to modernizing public administration systems in general and public procurement in particular. In 2002, national government procurement bodies established the Inter-American Network for Government ...

  5. Implementing Sustainable Public Procurement : an organisational change perspective

    NARCIS (Netherlands)

    J. Grandia (Jolien)

    2015-01-01

    markdownabstractFor the execution of policies, as well as for its own operations, governments procure goods and services, ranging from paper and pencils to fighter planes, cleaning services and public road works. In the European Union public procurement represents 16% of the gross domestic product.

  6. Corruption in Public Procurement: Finding the Right Indicators

    NARCIS (Netherlands)

    Ferwerda, J.; Deleanu, I.S.; Unger, B.

    2017-01-01

    Red flags are widely used to minimize the risk of various forms of economic misconduct, among which corruption in public procurement. Drawing on criminal investigations, the literature has developed several indicators of corruption in public procurements and has put them forward as viable risk

  7. Corruption in Public Procurement : Finding the Right Indicators

    NARCIS (Netherlands)

    Ferwerda, Joras; Deleanu, Ioana; Unger, Brigitte

    2017-01-01

    Red flags are widely used to minimize the risk of various forms of economic misconduct, among which corruption in public procurement. Drawing on criminal investigations, the literature has developed several indicators of corruption in public procurements and has put them forward as viable risk

  8. The EU Public Procurement regime - Does It Work?

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Ulff-Møller; Hansen, Lars Gottlieb

    2001-01-01

    Has the Single Market for public procurement had the expected effects after six years in progress? The following article attempts to answer this question by first presenting alternative theoretical approaches to analysing the EU liberalisation of the public procurement market and then confronting...

  9. 7 CFR 246.24 - Procurement and property management.

    Science.gov (United States)

    2010-01-01

    ... concerning violation of law are to be referred to such local, State or Federal authority as may have proper jurisdiction. (c) State regulations. The State or local agency may use its own procurement regulations which reflect applicable State and local regulations, provided that procurements made with Program funds adhere...

  10. 7 CFR 215.14a - Procurement standards.

    Science.gov (United States)

    2010-01-01

    ... to the local, State or Federal authority that has proper jurisdiction. (c) Procedures. The State... food authority or child care institution may use its own procurement procedures which reflect applicable State or local laws and regulations, provided that procurements made with nonprofit school food...

  11. 7 CFR 249.21 - Procurement and property management.

    Science.gov (United States)

    2010-01-01

    ... to such local, State or Federal authority as may have proper jurisdiction. (c) State regulations. The... applicable State and local regulations; and (2) Any procurements made with SFMNP funds adhere to the... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management. 249.21 Section...

  12. Procurement strategy formation : (re-)designing rail infrastructure project alliances

    NARCIS (Netherlands)

    Plantinga, Henrico; Dorée, André

    2016-01-01

    Purpose – The purpose of this paper is to provide insights into the reasoning behind the development of new procurement approaches by public sector clients. Design/methodology/approach – A case study approach focuses on a procurement development process by a public sector client. It investigates the

  13. 19 CFR 162.11 - Authority to procure warrants.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 2 2010-04-01 2010-04-01 false Authority to procure warrants. 162.11 Section 162.11 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) INSPECTION, SEARCH, AND SEIZURE Search Warrants § 162.11 Authority to procure...

  14. Public procurement of innovation in construction : A design science approach

    NARCIS (Netherlands)

    Lenderink, B.; Halman, J. I.M.; Voordijk, J.T.

    2016-01-01

    The inclusion of innovation as a policy objective in public procurement has increased significantly at public organizations over the last years. However, public organizations often struggle with how they should stimulate innovation through public procurement as there are many different ways possible

  15. 48 CFR 2901.603-72 - Administrative procurement management reviews.

    Science.gov (United States)

    2010-10-01

    ... Authority, and Responsibilities 2901.603-72 Administrative procurement management reviews. (a) The Senior... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Administrative procurement management reviews. 2901.603-72 Section 2901.603-72 Federal Acquisition Regulations System DEPARTMENT OF...

  16. SUITABILITY OF CORNEAL TISSUE FOR TRANSPLANTATION PROCURED FROM HANGING CASES

    Directory of Open Access Journals (Sweden)

    Rekha Gyanchand

    2017-06-01

    Full Text Available BACKGROUND Requirement of donor cornea is essential to target the corneal blind. The best method to procure such corneas is from any major hospitals, which has a mortuary facility. The eye donation with hanging as the cause of death is very common in a mortuary setup. Some factors that are concerning regarding corneas procured from death due to hanging is the prolonged exposure of the cornea at the time of death, the exact time of death is not known, most of the cadavers are refrigerated for investigations as these arrive at the mortuary usually at night. Due to these reasons, the corneal surgeons are hesitant to use corneas procured from death due to hanging for corneal transplantation. Analysing these corneas would contribute to a great extent to the donor cornea pool in providing sight to the corneal blind, especially as majority are young individuals who commit suicide by hanging. In this study, the donor corneas were analysed with regards to corneal epithelial defect, endothelial cell morphology and utilisation of these corneas for transplantation. The aim of the HCRP study is to analyse the effect of death due to hanging on donor cornea. 1. Corneal epithelial status. 2. Corneal endothelial cell morphology. 3. Utilisation of corneas for transplantation. MATERIALS AND METHODS Donor corneas from 22 donors who died due to hanging were procured from hospital mortuary. All the 44 corneas were transplanted. Various parameters like demography, death to enucleation time, cadaver preservation in cold storage, endothelial cell density and utilisation of cornea for transplantation were noted. Design- Retrospective study. Statistical Analysis- Descriptive statistics, Pearson and Spearman correlation and Chi-square test were used to test the hypotheses. RESULTS Out of the 44 corneas analysed, 75% of the donors were refrigerated as a part of medicolegal investigations protocol. The average DTP time was 12 hours in refrigerated group and 5 hours in non

  17. Procurement Practices for the Composite Armored Vehicle and Composite Affordability Initiative Programs

    National Research Council Canada - National Science Library

    Granetto, Paul

    1999-01-01

    The audit objective was to determine whether violations of procurement regulations occurred regarding procurement of selected components of the Army Crusader vehicle and the Joint Strike Fighter aircraft...

  18. Navy Acquisition Executive's Management Oversight and Procurement Authority Category I and II Programs

    National Research Council Canada - National Science Library

    2007-01-01

    .... This report discusses the management oversight and procurement authority within the Navy. Two other reports discussed the management oversight and procurement authority within the Army and Air Force...

  19. International Government-Procurement Obligations of the United States: An Overview

    National Research Council Canada - National Science Library

    Tatelman, Todd B

    2005-01-01

    .... The most notable agreements are contained in the World Trade Organization (WTO) Agreement on Government Procurement and the procurement chapter of the North American Free Trade Agreement (NAFTA...

  20. The role and duties of client in public procurement management

    Directory of Open Access Journals (Sweden)

    Joković Radomir V.

    2015-01-01

    Full Text Available Public procurement is given great importance in all developed countries. The subject of this paper is to present the application of basic concepts of project management from the standpoint of public procurement in the higher education institution. Previous research, by examining the literature of domestic and foreign authors, and analysis of project performance management model is defined by the public procurement in the higher education institution whose application can improve overall process performance lrojekta and contribute to economic and efficient implementation of planned activities and time for reaching the goals. One of the objectives of model application of project management procurement at a higher education institution is to identify and determine the type and quantity of goods, uspuga, works, studies of conditions that influence their purchase, as well as finding ways of ensuring that goods, services, papers are available on the project in due time. This paper presents a model of project management public procurement in the higher education institution.

  1. Reliability and Validity Study for the Coloured Progressive Matrices Test between the Ages of 3-9 for Determining Gifted Children in the Pre-School Period

    Science.gov (United States)

    Bildiren, Ahmet

    2017-01-01

    The objective of the study was to test the Coloured Progressive Matrices Test with regard to reliability and validity for the 3-9 age sample group because of the lack of diagnostic tools for the pre-school period. The sample group of the study was comprised of a total of 925 children with 433 girls (46.8%) and 492 boys (53.2%). Coloured…

  2. Risk Factors Influencing Construction Procurement Performance in Nigeria

    Directory of Open Access Journals (Sweden)

    Alhassan Dahiru

    2015-08-01

    Full Text Available One of the challenges facing construction procurement performance is the failure to determine the risk related factors limiting its success. These risk factors can cause a significant increase in the procurement cost leading to an increase in the overall project cost. The purpose of this study is to identify and evaluate the risk factors influencing construction procurement performance with a view to achieve the overall project performance. The objectives are to establish a relative significance index score for the most important risk factors limiting the procurement performance of the projects. A self administered questionnaire was employed to the construction industry professionals for responses. A total of 78 questionnaires were distributed to these professionals (architects, quantity surveyors, engineers, and contractors but 62 were returned and analyzed using influential index and later ranked in order of importance. Results of the analysis indicate a disparity in terms of ranking of the factors influencing construction procurement performance. Corruption related risk, conflict of interest, ineffective project technical feasibility, and lack of commitment to transparency were found to be the most significant factors limiting construction procurement performance. Communication barriers and unconfidential tender evaluation process were found to be the low weighted risk factors. The findings can serve as a supportive mechanism for risks management in public construction procurement management. Therefore, construction procurement personnel at all levels of government may find this study relevant, while improving construction procurement performance in the country. It is recommended that construction procurement system should be focused on risks related to corruption, conflict of interest, and effective technical feasibility for improving the overall project performance.

  3. An Identification of Problems Relating to Federal Procurement of Library Materials Prepared for Commission on Government Procurement.

    Science.gov (United States)

    Federal Library Committee, Washington, DC.

    The Federal Library Committee through the Task Force on Procurement Procedures in Federal Libraries is examining all problems and is recommending policies, procedures, and practices which will maximize the efficient procurement of library materials. It is suggested that the vehicle for this investigation be the appropriate Commission on Government…

  4. Optimal selling price and energy procurement strategies for a retailer in an electricity market

    International Nuclear Information System (INIS)

    Hatami, A.R.; Seifi, H.; Sheikh-El-Eslami, M.K.

    2009-01-01

    In an electricity market, the retailer sets up contracts with the wholesale side for purchasing electricity and with the customers for its selling. This paper proposes a mathematical method based on mixed-integer stochastic programming to determine the optimal sale price of electricity to customers and the electricity procurement policy of a retailer for a specified period. The retailer has multiple choices for electricity procurement, such as spot market, forward contracts, call options and self-production. Risk is considered and modeled by conditional value-at-risk methodology. Also, the competition between retailers is modeled using a market share function. A case study is illustrated to demonstrate the capability of the proposed method. (author)

  5. Flow tests of the Willis Hulin Well. Volume III. Final report for the period October 1985--October 1990

    Energy Technology Data Exchange (ETDEWEB)

    Randolph, P.L.; Hayden, C.G.; Rogers, L.A.

    1992-02-01

    The initial flow test of the Hulin well was done to obtain brine and gas samples and to get a first measure of the reservoir properties. The 20,602 to 20,690-foot interval was perforated and tested in two short-term draw-down and buildup tests. This zone had an initial pressure of 17,308 psia and temperature of 339 F. The total dissolved solids of 207,000 mg/L (mostly sodium chloride) is higher than for previously tested Gulf Coast geopressured-geothermal wells. The gas content in the brine of 31 to 32 SCF/STB indicates that the brine is at or near saturation with natural gas. The permeability, as deduced from the draw-down and buildup tests, is 13 md for the lower 80-foot-thick sand member. The duration of the tests was too short to determine the lateral extent of the reservoir; but declining measured values for static bottomhole pressure prior to each flow test suggests a relatively small reservoir. When the uppermost interval in the zone of interest (20,220 to 20,260 feet) was perforated such that flow from this zone would commingle with flow from the lower zone, little to no free gas was observed. It had been speculated before the test that there might be free gas in this upper zone. These speculations were generally deduced from logs after assuming the formation contained brine that had a salinity between 70,000 and 100,000 mg/L. The actual salinity was more than twice that number. it is now apparent that the amount of free gas, if any, is too small to make a significant contribution to production in a short-term test. This does not preclude the possibility of mobilization of gas by higher drawdown or coning down from an offsetting gas cap in one or more of the sand members. However, there was no evidence that this was occurring in this test. No measurements of the reservoir parameters, such as permeability, were made for the shallowest interval tested. But substantially lower drawdown for the commingled zones suggests either higher permeability or lower skin

  6. AN EDUCATIONAL GAME IN CONSTRUCTION PROCUREMENT NEGOTIATION

    Directory of Open Access Journals (Sweden)

    Ren-Jye Dzeng

    2013-06-01

    Full Text Available Project managers are frequently required to negotiate during the procurement of construction materials and drawing up of contractual agreements. Training in negotiation training requires hands-on experience and interaction with multiple parties. However, in the conventional curriculum on construction management, negotiation is taught merely through lectures and case studies. This study addressed that shortcoming by developing a portfolio negotiation game in which students play different roles and actively make decisions while proceeding through a simulated negotiation process in a competitive context. The proposed game would be the first negotiation game within the domain of the construction industry. During the pilot study, 46 students (with or without industrial working experience played the game; the results showed an increase in learning interest, satisfaction, and effectiveness.

  7. Quality assurance in the procurement, design and manufacture of nuclear fuel assemblies

    International Nuclear Information System (INIS)

    1983-01-01

    This Safety Guide provides requirements and recommendations for quality assurance programmes that are relevant for the unique features of the procurement, design, manufacture, inspection, testing, packaging, shipping, storage, and receiving inspection of fuel assemblies for nuclear power plants. The generic quality assurance requirements of the Code and related Safety Guides are referred to where applicable, and are duplicated in this document where increased emphasis is desirable

  8. Implementation of basic quality control tests for malaria medicines in Amazon Basin countries: results for the 2005-2010 period.

    Science.gov (United States)

    Pribluda, Victor S; Barojas, Adrian; Añez, Arletta; López, Cecilia G; Figueroa, Ruth; Herrera, Roxana; Nakao, Gladys; Nogueira, Fernando Ha; Pianetti, Gerson A; Povoa, Marinete M; Viana, Giselle Mr; Gomes, Margarete S Mendonça; Escobar, Jose P; Sierra, Olga L Muñoz; Norena, Susana P Rendon; Veloz, Raúl; Bravo, Marcy Silva; Aldás, Martha R; Hindssemple, Alison; Collins, Marilyn; Ceron, Nicolas; Krishnalall, Karanchand; Adhin, Malti; Bretas, Gustavo; Hernandez, Nelly; Mendoza, Marjorie; Smine, Abdelkrim; Chibwe, Kennedy; Lukulay, Patrick; Evans, Lawrence

    2012-06-15

    Ensuring the quality of malaria medicines is crucial in working toward malaria control and eventual elimination. Unlike other validated tests that can assess all critical quality attributes, which is the standard for determining the quality of medicines, basic tests are significantly less expensive, faster, and require less skilled labour; yet, these tests provide reproducible data and information on several critical quality attributes, such as identity, purity, content, and disintegration. Visual and physical inspection also provides valuable information about the manufacturing and the labelling of medicines, and in many cases this inspection is sufficient to detect counterfeit medicines. The Promoting the Quality of Medicines (PQM) programme has provided technical assistance to Amazon Malaria Initiative (AMI) countries to implement the use of basic tests as a key screening mechanism to assess the quality of malaria medicines available to patients in decentralized regions. Trained personnel from the National Malaria Control Programmes (NMCPs), often in collaboration with country's Official Medicine Control Laboratory (OMCL), developed country- specific protocols that encompassed sampling methods, sample analysis, and data reporting. Sampling sites were selected based on malaria burden, accessibility, and geographical location. Convenience sampling was performed and countries were recommended to store the sampled medicines under conditions that did not compromise their quality. Basic analytical tests, such as disintegration and thin layer chromatography (TLC), were performed utilizing a portable mini-laboratory. Results were originally presented at regional meetings in a non-standardized format that lacked relevant medicines information. However, since 2008 information has been submitted utilizing a template specifically developed by PQM for that purpose. From 2005 to 2010, the quality of 1,663 malaria medicines from seven AMI countries was evaluated, mostly

  9. Implementation of basic quality control tests for malaria medicines in Amazon Basin countries: results for the 2005–2010 period

    Directory of Open Access Journals (Sweden)

    Pribluda Victor S

    2012-06-01

    Full Text Available Abstract Background Ensuring the quality of malaria medicines is crucial in working toward malaria control and eventual elimination. Unlike other validated tests that can assess all critical quality attributes, which is the standard for determining the quality of medicines, basic tests are significantly less expensive, faster, and require less skilled labour; yet, these tests provide reproducible data and information on several critical quality attributes, such as identity, purity, content, and disintegration. Visual and physical inspection also provides valuable information about the manufacturing and the labelling of medicines, and in many cases this inspection is sufficient to detect counterfeit medicines. The Promoting the Quality of Medicines (PQM programme has provided technical assistance to Amazon Malaria Initiative (AMI countries to implement the use of basic tests as a key screening mechanism to assess the quality of malaria medicines available to patients in decentralized regions. Methods Trained personnel from the National Malaria Control Programmes (NMCPs, often in collaboration with country’s Official Medicine Control Laboratory (OMCL, developed country- specific protocols that encompassed sampling methods, sample analysis, and data reporting. Sampling sites were selected based on malaria burden, accessibility, and geographical location. Convenience sampling was performed and countries were recommended to store the sampled medicines under conditions that did not compromise their quality. Basic analytical tests, such as disintegration and thin layer chromatography (TLC, were performed utilizing a portable mini-laboratory. Results Results were originally presented at regional meetings in a non-standardized format that lacked relevant medicines information. However, since 2008 information has been submitted utilizing a template specifically developed by PQM for that purpose. From 2005 to 2010, the quality of 1,663 malaria medicines

  10. Improving a Complement-fixation Test for Equine Herpesvirus Type-1 by Pretreating Sera with Potassium Periodate to Reduce Non-specific Hemolysis

    Science.gov (United States)

    BANNAI, Hiroshi; NEMOTO, Manabu; TSUJIMURA, Koji; YAMANAKA, Takashi; KONDO, Takashi; MATSUMURA, Tomio

    2013-01-01

    Non-specific hemolysis has often been observed during complement-fixation (CF) tests for equine herpesvirus type-1 (EHV-1), even when the sera have virus-specific CF antibodies. This phenomenon has also been reported in CF tests for various infectious diseases of swine. We found that the sera from 22 of 85 field horses (25.9%) showed non-specific hemolysis during conventional CF testing for EHV-1. Because pretreatment of swine sera with potassium periodate (KIO4) improves the CF test for swine influenza, we applied this method to horse sera. As we expected, horse sera treated with KIO4 did not show non-specific hemolysis in the EHV-1 CF test, and precise determination of titers was achieved. PMID:24834005

  11. Diagnostic development and support of MHD test facilities: Technical progress report for the period January, February, March 1985

    International Nuclear Information System (INIS)

    Shepard, W.S.; Cook, R.L.

    1985-04-01

    Mississippi State University is developing diagnostic instruments for MHD power train data acquisition and for support of MHD component development test facilities. Microprocessor-controlled optical instruments, initially developed for HRSR support, are being refined, and new systems to measure temperatures and gas-seed-slag stream characteristics are being developed. To further data acquisition and analysis capabilities, the diagnostic systems are being interfaced with MHD Energy Center computers. Additionally, technical support of the diagnostic needs of the national MHD research effort is being provided

  12. Sustainable promotion nuclear power enterprise procurement bidding risk management

    International Nuclear Information System (INIS)

    Wu Yimin

    2014-01-01

    Nuclear power enterprise procurement bidding work faced with certain risk in recent years, the domestic nuclear power enterprises in the bidding work never stop research and explore the effective ways to guard against legal risks, and has made considerable progress, the eighteenth big country advocates the safety and efficiency of nuclear power development policy, in the face of the subsequent nuclear power construction projects have started, nuclear power enterprise bidding risk management work shoulder heavy responsibilities article through nuclear power enterprise procurement bidding risk management present situation, proposed the sustainable promotion nuclear power enterprise procurement bidding risk management countermeasures. (author)

  13. A Framework for Usability Evaluation in EHR Procurement.

    Science.gov (United States)

    Tyllinen, Mari; Kaipio, Johanna; Lääveri, Tinja

    2018-01-01

    Usability should be considered already by the procuring organizations when selecting future systems. In this paper, we present a framework for usability evaluation during electronic health record (EHR) system procurement. We describe the objectives of the evaluation, the procedure, selected usability attributes and the evaluation methods to measure them. We also present the emphasis usability had in the selection process. We do not elaborate on the details of the results, the application of methods or gathering of data. Instead we focus on the components of the framework to inform and give an example to other similar procurement projects.

  14. Corporate Social Responsibility and Sustainability in Danish Public Procurement

    DEFF Research Database (Denmark)

    Andrecka, Marta

    2017-01-01

    understand the continuously developing concepts of SPP, as well as to identify the drivers and barriers that promote or hinder its further implementation. This article firstly deals with the relationship between the concepts of sustainability, Corporate Social Responsibility (CSR) and public procurement....... Secondly, as Denmark has been known as a pioneer in sustainable development, including implementation of it in public purchasing this article focuses on recent developments in the areas of CSR and sustainable public procurement in Denmark, and analyses relevant Danish Public Procurement Complaints Board...

  15. E-PROCUREMENT: IMPORTANCIA Y APLICACIÓN

    Directory of Open Access Journals (Sweden)

    Isabel Fernández Quesada

    2003-04-01

    Full Text Available En el trabajo se aborda uno de los aspectos externos del e-business: el e-procurement. Se valora la importancia de la utilización de la red en general y en la función logística y de compras, en particular. Partiendo de las actividades tradicionales de compras, se explicitan las ventajas que supone respecto a ellas el e-procurement y la importancia estratégica de su aplicación. Asimismo, se profundiza en el propio concepto de e-procurement y en su arquitectura desde el punto de vista de su implantación empresarial.

  16. Procuring load curtailment from local customers under uncertainty.

    Science.gov (United States)

    Mijatović, Aleksandar; Moriarty, John; Vogrinc, Jure

    2017-08-13

    Demand side response (DSR) provides a flexible approach to managing constrained power network assets. This is valuable if future asset utilization is uncertain. However there may be uncertainty over the process of procurement of DSR from customers. In this context we combine probabilistic modelling, simulation and optimization to identify economically optimal procurement policies from heterogeneous customers local to the asset, under chance constraints on the adequacy of the procured DSR. Mathematically this gives rise to a search over permutations, and we provide an illustrative example implementation and case study.This article is part of the themed issue 'Energy management: flexibility, risk and optimization'. © 2017 The Author(s).

  17. Use of commercial grade item dedication to reduce procurement costs

    International Nuclear Information System (INIS)

    Rosch, F.

    1995-01-01

    In the mid-1980s, the Nuclear Regulatory Industry (NRC) began inspecting utility practices of procuring and dedicating commercial grade items intended for plant safety-related applications. As a result of the industry efforts to address NRC concerns, nuclear utilities have enhanced existing programs and procedures for dedication of commercial grade items. Though these programs were originally enhanced to meet NRC concerns, utilities have discovered that the dedication of commercial grade items can also reduce overall procurement costs. This paper will discuss the enhancement of utility dedication programs and demonstrates how utilities have utilized them to reduce procurement costs

  18. QA in the procurement of items and services

    International Nuclear Information System (INIS)

    Wilhelm, H.

    1980-01-01

    Procurement of items and services is one of the important elements during the design and construction of Nuclear Power Plants. The purchaser has to establish and implement controls over the procurement process to ensure that the quality criteria, quality level and other quality requirements specified for the particuliar item or service are taken into account. The effect on safety of an error in service or the malfunction of an item is the most important factor to be considered in determining the extent of quality assurance efforts. A typical example of a procurement process will be demonstrated for safety related mechanical components. (orig./RW)

  19. Future Capacity Procurements Under Unknown Demand and Increasing Costs

    OpenAIRE

    Apostolos Burnetas; Stephen Gilbert

    2001-01-01

    In this paper we study a situation in which a broker must manage the procurement of a short-life-cycle product. As the broker observes demand for the item, she learns about the demand process. However, as is often the case in practice, it becomes either more difficult or more expensive to procure the item as the selling season advances. Thus, the broker must trade off higher procurement costs against the benefit of making ordering decisions with better information about demand. Problems of th...

  20. Notes on testing equality and interval estimation in Poisson frequency data under a three-treatment three-period crossover trial.

    Science.gov (United States)

    Lui, Kung-Jong; Chang, Kuang-Chao

    2016-10-01

    When the frequency of event occurrences follows a Poisson distribution, we develop procedures for testing equality of treatments and interval estimators for the ratio of mean frequencies between treatments under a three-treatment three-period crossover design. Using Monte Carlo simulations, we evaluate the performance of these test procedures and interval estimators in various situations. We note that all test procedures developed here can perform well with respect to Type I error even when the number of patients per group is moderate. We further note that the two weighted-least-squares (WLS) test procedures derived here are generally preferable to the other two commonly used test procedures in the contingency table analysis. We also demonstrate that both interval estimators based on the WLS method and interval estimators based on Mantel-Haenszel (MH) approach can perform well, and are essentially of equal precision with respect to the average length. We use a double-blind randomized three-treatment three-period crossover trial comparing salbutamol and salmeterol with a placebo with respect to the number of exacerbations of asthma to illustrate the use of these test procedures and estimators. © The Author(s) 2014.

  1. Essays in the Economics of Procurement,

    Science.gov (United States)

    1993-01-01

    Their support, encouragement, and critical reviews of draft articles were invaluable. Other notable contributions over the course of the project were...the period-by-period capital asset pricing model ( CAPM ). The period-by-period CAPM is common in applied work but the assumptions that underlie it are...may in turn mean that the data are inconsistent with application of the period-by-period CAPM ; see Fama (1977). For discussion of other problems in

  2. 41 CFR 101-26.602-1 - Procurement of lubricating oils, greases, and gear lubricants.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of... Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.6-Procurement Sources Other Than GSA § 101...

  3. 76 FR 53113 - Guidelines for Designating Biobased Products for Federal Procurement

    Science.gov (United States)

    2011-08-25

    ... Designating Biobased Products for Federal Procurement AGENCY: Office of Procurement and Property Management... that the Department of Agriculture, Office of Procurement and Property Management, is hereby requesting... comments to: Ron Buckhalt, USDA, Office of Procurement and Property Management, Room 361, Reporters...

  4. Public procurement as a tool to drive innovation in South Africa ...

    African Journals Online (AJOL)

    This article is an analysis of the use of public procurement as a tool to drive innovation. It explores the meaning of innovative procurement or public procurement of innovation, as well as the rationale for using public procurement to drive innovation. It then focuses on South Africa and evaluates whether there is scope within ...

  5. Entering the United States Federal Procurement Market: success factors and barriers for foreign firms.

    NARCIS (Netherlands)

    Vehof, Tim; Telgen, Jan; Ruel, Hubertus Johannes Maria; Ruel, H.J.M.

    2012-01-01

    The US federal procurement market is the largest procurement market in the world. Therefore, it is an attractive market for foreign companies to enter. Existing literature indicates the success factors and barriers for public procurement market entry in general, however not for the US procurement

  6. 13 CFR 121.407 - What are the size procedures for multiple item procurements?

    Science.gov (United States)

    2010-01-01

    ... Requirements for Government Procurement § 121.407 What are the size procedures for multiple item procurements? If a procurement calls for two or more specific end items or types of services with different size... multiple item procurements? 121.407 Section 121.407 Business Credit and Assistance SMALL BUSINESS...

  7. The World Bank Group and Public Procurement--An Independent Evaluation : Appendixes to Volume 1

    OpenAIRE

    Independent Evaluation Group

    2014-01-01

    Good public procurement practices are a major determinant of the effectiveness of public expenditure. On behalf of their citizens, governments typically spend as much as 5-20 percent of their gross domestic product on procurement of goods and services, and effective procurement policies enable better use of government budgets. Good national procurement practices are therefore an essential ...

  8. 76 FR 76808 - Procurement Thresholds for Implementation of the Trade Agreements Act of 1979

    Science.gov (United States)

    2011-12-08

    ... Organization (WTO) Agreement on Government Procurement, Chapter 15 of the United States-Australia Free Trade... out U.S. trade agreement obligations under the WTO Agreement on Government Procurement, Chapter 15 of... Agreement on Government Procurement A. Central Government Entities Listed in U.S. Annex 1 (1) Procurement of...

  9. Optimized Energy Procurement for Cellular Networks with Uncertain Renewable Energy Generation

    KAUST Repository

    Rached, Nadhir B.

    2017-02-07

    Renewable energy (RE) is an emerging solution for reducing carbon dioxide (CO2) emissions from cellular networks. One of the challenges of using RE sources is to handle its inherent uncertainty. In this paper, a RE powered cellular network is investigated. For a one-day operation cycle, the cellular network aims to reduce energy procurement costs from the smart grid by optimizing the amounts of energy procured from their locally deployed RE sources as well as from the smart grid. In addition to that, it aims to determine the extra amount of energy to be sold to the electrical grid at each time period. Chance constrained optimization is first proposed to deal with the randomness in the RE generation. Then, to make the optimization problem tractable, two well- know convex approximation methods, namely; Chernoff and Chebyshev based-approaches, are analyzed in details. Numerical results investigate the optimized energy procurement for various daily scenarios and compare between the performances of the employed convex approximation approaches.

  10. SKALA, a log-periodic array antenna for the SKA-low instrument: design, simulations, tests and system considerations

    Science.gov (United States)

    de Lera Acedo, E.; Razavi-Ghods, N.; Troop, N.; Drought, N.; Faulkner, A. J.

    2015-10-01

    The very demanding requirements of the SKA-low instrument call for a challenging antenna design capable of delivering excellent performance in radiation patterns, impedance matching, polarization purity, cost, longevity, etc. This paper is devoted to the development (design and test of the first prototypes) of an active ultra-wideband antenna element for the low-frequency instrument of the SKA radio telescope. The antenna element and differential low noise amplifier described here were originally designed to cover the former SKA-low band (70-450 MHz) but it is now aimed to cover the re-defined SKA-low band (50-350 MHz) and furthermore the antenna is capable of performing up to 650 MHz with the current design. The design is focused on maximum sensitivity in a wide field of view (+/- 45° from zenith) and low cross-polarization ratios. Furthermore, the size and cost of the element has to be kept to a minimum as millions of these antennas will need to be deployed for the full SKA in very compact configurations. The primary focus of this paper is therefore to discuss various design implications for the SKA-low telescope.

  11. The influence of periodic increases of human activity on crepuscular and nocturnal mammals: Testing the weekend effect.

    Science.gov (United States)

    Nix, Joshua H; Howell, Ryan G; Hall, Lucas K; McMillan, Brock R

    2018-01-01

    Human recreation can negatively affect wildlife, particularly on weekends when human activity is highest (i.e., the weekend effect). Much of what we understand about the weekend effect is based on research conducted on diurnal species, which have greater temporal overlap with humans. Because nocturnal species generally avoid times when humans are active, they are likely less affected by anthropogenic activity on weekends. Our objective was to test the weekend effect in relation to the degree of nocturnality of mammals in a recreational area. We predicted that as nocturnality increased, the effect of human activity would decrease. To address our objective, we placed 50 remote cameras along the Diamond Fork River in Utah from January to June 2015. We found that three out of the four focal species supported our predictions. Mule deer (crepuscular) reduced activity throughout our entire study area during weekends and avoided campgrounds. Beavers and mountain lions (both nocturnal) did not negatively respond to increased human activity. Raccoons (nocturnal) reduced activity during weekends, but only within campground areas. Our findings indicate that as the temporal overlap increases between wildlife and humans, so does the influence that humans have on wildlife. Copyright © 2017 Elsevier B.V. All rights reserved.

  12. Testing equality and interval estimation in binary responses when high dose cannot be used first under a three-period crossover design.

    Science.gov (United States)

    Lui, Kung-Jong; Chang, Kuang-Chao

    2015-01-01

    When comparing two doses of a new drug with a placebo, we may consider using a crossover design subject to the condition that the high dose cannot be administered before the low dose. Under a random-effects logistic regression model, we focus our attention on dichotomous responses when the high dose cannot be used first under a three-period crossover trial. We derive asymptotic test procedures for testing equality between treatments. We further derive interval estimators to assess the magnitude of the relative treatment effects. We employ Monte Carlo simulation to evaluate the performance of these test procedures and interval estimators in a variety of situations. We use the data taken as a part of trial comparing two different doses of an analgesic with a placebo for the relief of primary dysmenorrhea to illustrate the use of the proposed test procedures and estimators.

  13. The impact of "Ramadan fasting period" on total and differential white blood cells, haematological indices, inflammatory biomarker, respiratory symptoms and pulmonary function tests of healthy and asthmatic patients.

    Science.gov (United States)

    Askari, V R; Alavinezhad, A; Boskabady, M H

    2016-01-01

    There is no conclusive evidence regarding the effect of fasting on different features in asthmatic patients. In the present study, the effect of Ramadan fasting in asthmatic patients and healthy control was studied. Haematological indices, inflammatory mediators, pulmonary function tests (PFT) and respiratory symptoms were evaluated in 15 asthmatic patients compared to 14 healthy matched control group before and after the one-month fasting period in Ramadan. The change in each parameter from the beginning to the end of Ramadan was calculated and referred to as "variation during Ramadan". The values of MCH, MCHC in both groups and monocyte counts in asthmatic patients, were significantly increased but platelet count was reduced in asthmatic and controls respectively compared to pre-Ramadan fasting period (Pfasting month (Pfasting month in both groups were non-significantly higher compared to pre-fasting values except FVC. Respiratory symptoms in asthmatic patients were non-significantly but wheeze-o was significantly reduced after Ramadan fasting period in asthma group (Pfasting period between two groups, although reduction of hs-CRP in asthmatic group was non-significantly higher than control group. These results show that Ramadan fasting period has no negative impact on asthma and may have some positive effect on asthma severity with regard to reduction of hs-CRP concentration and chest wheeze. Copyright © 2016 SEICAP. Published by Elsevier España, S.L.U. All rights reserved.

  14. Aespoe Hard Rock Laboratory. Temperature Buffer Test. Sensors data report (Period 030326-080701) Report No:12

    International Nuclear Information System (INIS)

    Goudarzi, Reza; Aakesson, Mattias; Hoekmark, Harald

    2008-01-01

    TBT (Temperature Buffer Test) is a joint project between SKB/ANDRA and supported by ENRESA (modeling) and DBE (instrumentation), which aims at understanding and modeling the thermo-hydro-mechanical behavior of buffers made of swelling clay submitted to high temperatures (over 100 deg C) during the water saturation process. The test is carried out in Aespoe HRL in a 8 meters deep and 1.75 m diameter deposition hole, with two heaters (3 m long, 0.6 m diameter), surrounded by a MX 80 bentonite buffer and a confining plug on top anchored with 9 rods. It was installed during spring 2003. Two buffer arrangements are being investigated: - The lower heater is surrounded by bentonite in the usual way, allowing the temperature of the bentonite to exceed 100 deg C locally. - The higher heater is surrounded by a ring of sand acting as thermal protection for the bentonite, the temperature of which is kept below 100 deg C. The canisters were heated with 1500 W power from day 15 to day 1171, when the power was raised to 1600 W. Around day 1700, the power was by steps raised in the lower heater to 2000 W and reduced in the upper heater to 1000 W. This report presents data from the measurements in the Temperature Buffer Test from 030326 to 080701 (26 March 2003 to 01 July 2008). The following measurements are made in the bentonite: Temperature is measured in 92 points, total pressure in 29 points, pore water pressure in 8 points and relative humidity in 35 points. Temperature is also measured by all gauges as an auxiliary measurement used for compensation. The following additional measurements are done: temperature is measured in 40 points in the rock, in 11 points on the surface of each canister and in 6 points inside each canister. The force on the confining plug is measured in 3 of the 9 rods and its vertical displacement is measured in three points. The water inflow and water pressure in the outer sand filter is also measured. Temperature and total pressure measurements

  15. Aespoe Hard Rock Laboratory. Temperature Buffer Test. Sensors data report (Period 030326-080701) Report No:12

    Energy Technology Data Exchange (ETDEWEB)

    Goudarzi, Reza; Aakesson, Mattias; Hoekmark, Harald (Clay Technology AB, Lund (Sweden))

    2008-07-01

    TBT (Temperature Buffer Test) is a joint project between SKB/ANDRA and supported by ENRESA (modeling) and DBE (instrumentation), which aims at understanding and modeling the thermo-hydro-mechanical behavior of buffers made of swelling clay submitted to high temperatures (over 100 deg C) during the water saturation process. The test is carried out in Aespoe HRL in a 8 meters deep and 1.75 m diameter deposition hole, with two heaters (3 m long, 0.6 m diameter), surrounded by a MX 80 bentonite buffer and a confining plug on top anchored with 9 rods. It was installed during spring 2003. Two buffer arrangements are being investigated: - The lower heater is surrounded by bentonite in the usual way, allowing the temperature of the bentonite to exceed 100 deg C locally. - The higher heater is surrounded by a ring of sand acting as thermal protection for the bentonite, the temperature of which is kept below 100 deg C. The canisters were heated with 1500 W power from day 15 to day 1171, when the power was raised to 1600 W. Around day 1700, the power was by steps raised in the lower heater to 2000 W and reduced in the upper heater to 1000 W. This report presents data from the measurements in the Temperature Buffer Test from 030326 to 080701 (26 March 2003 to 01 July 2008). The following measurements are made in the bentonite: Temperature is measured in 92 points, total pressure in 29 points, pore water pressure in 8 points and relative humidity in 35 points. Temperature is also measured by all gauges as an auxiliary measurement used for compensation. The following additional measurements are done: temperature is measured in 40 points in the rock, in 11 points on the surface of each canister and in 6 points inside each canister. The force on the confining plug is measured in 3 of the 9 rods and its vertical displacement is measured in three points. The water inflow and water pressure in the outer sand filter is also measured. Temperature and total pressure measurements

  16. 41 CFR 105-72.506 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.50-Post-Award Requirements/Procurement Standards...) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...

  17. Procurement and Contracting, Transportation & Public Facilities, State of

    Science.gov (United States)

    Visiting Alaska State Employees Alaska Department of Transportation & Public Facilities header image Alaska Department of Transportation & Public Facilities / Procurement and Contracting Search DOT& pages Department of Transportation & Public Facilities PO Box 112500 3132 Channel Drive Juneau

  18. Sustainable Public Procurement: A Tool for Greening the Economy ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... power to influence market trends, and production conditions and requirements. ... -create a practical handbook and policy papers for policymakers on how ... and value of the Green Procurement Handbook and to demonstrate the multiplier ...

  19. Quality of Spousal Relationship on Procurement of Abortion in Peri ...

    African Journals Online (AJOL)

    Quality of Spousal Relationship on Procurement of Abortion in Peri-Urban Nigeria. ... Communication was the only dimension of relationship quality that showed significant association with history of induced ... AJOL African Journals Online.

  20. Inefficient procurement processes undermine access to medicines in ...

    African Journals Online (AJOL)

    Inefficient procurement processes undermine access to medicines in the Western ... chronic infectious and non-communicable diseases in the public sector. ... (ii) absence of contracts for certain medicines appearing on provincial code lists; ...

  1. REPUTATIONAL CAPITAL OF POLITICAL ACTORS AS PUBLIC PROCUREMENT

    Directory of Open Access Journals (Sweden)

    A. E. Rudakova

    2015-01-01

    Full Text Available The author examines the reputational characteristics of the formation of political actors at the expense of the state budget, the specificity of the mechanism of implementation of government procurement and modern Russian practice.

  2. Lives and choices, give and take: Altruism and organ procurement.

    Science.gov (United States)

    Thornton, Vicky

    2017-01-01

    In 2015, Wales introduced a deemed consent: soft opt-out system for organ procurement in order to address the chronic shortage of organs for transplant. Early statistical evidence suggests that this has had a positive impact on cadaveric organ donation. Such a system for procurement has previously been dismissed by the Organ Donation Taskforce, who suggested that opting out could potentially undermine the concept of donated organs as gifts and this could then negatively impact the number of organs offered for transplant. Considerable weight was placed upon the need to retain the altruistic gift element associated with an opt-in system. This article will consider the role of altruism in an organ procurement policy. A broad utilitarian approach will be taken when putting forward the arguments in favour of adopting a weak altruism position in a soft opt-out system for procurement with a combined registry.

  3. Innovation and Public Procurement: Terminology, Concepts, and Applications

    DEFF Research Database (Denmark)

    Obwegeser, Nikolaus; Müller, Sune Dueholm

    2018-01-01

    as well as research gaps and opportunities for future research are identified. Based on analysis of existing research, the proposed framework provides an overview of state- of-the-art knowledge, a unified terminology, and a holistic understanding of innovation in public procurement. The framework is both...... review of the literature on innovation in public procurement. From categorizing publications based on innovation drivers, concepts, and research approaches, the emerging structure of the field is described and synthesized into a framework of innovation in public procurement. The proposed framework......The growing awareness of public procurement as an innovation policy tool has recently sparked the interest of both policy makers and researchers. While an increasing number of studies is being published every year, an overview of the field is missing. Researchers, practitioners, and policy makers...

  4. 77 FR 38775 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2012-06-29

    ... addition to Procurement List for production by the nonprofit agencies listed: Products NSN: 8415-MD-001..., Blend, Santa Fe, 6/16 oz Containers. NSN: 8950-01-E62-2187--Spice, Onion, Granulated, 6/18 oz Containers...

  5. 48 CFR 970.5223-2 - Affirmative procurement program.

    Science.gov (United States)

    2010-10-01

    ... for Management and Operating Contracts 970.5223-2 Affirmative procurement program. Link to an amendment published at 75 FR 57695, Sept. 22, 2010. As prescribed in 48 CFR (DEAR) 970.2304-2, insert the...

  6. 77 FR 62219 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2012-10-12

    ... addition to the Procurement List for production by the nonprofit agencies listed: Services Service Type... Maritime, Columbus, OH. SKILCRAFT-Spartan Chemical Cleaners NSN: 7930-00-NIB-0597--Tb-Cide Quat RTU...

  7. Nuclear power equipment procurement management under EPC mode

    International Nuclear Information System (INIS)

    Shuai Yuezhi

    2014-01-01

    Nuclear power equipment procurement is one of the major constraints and management difficulties in the process of domestic nuclear power project construction for a long time. The construction of Hainan Changjiang Project can not meet the milestones due to the major equipment supply delay. Through the introduction to the organization and features of Changjiang project equipment procurement under EPC mode, and the main problems in the procurement process and its reason analysis, the purpose of this paper is to put forward ideas and suggestions of these items, i.e. selection of equipment suppliers, equipment localization, mass material design and procurement, complete system equipment supply, spare parts delivery and storage, owner process management, providing reference for follow-up projects. (author)

  8. Public procurement, governance and economic growth: some policy ...

    African Journals Online (AJOL)

    Public procurement, governance and economic growth: some policy ... Employing the Keynesian income-expenditure approach to measuring the Gross Domestic ... reduce wastage, enhance the effectiveness of government spending, ensure ...

  9. The role of specification in public procurement of innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    A taken for granted assertion in the literature discussing how public procurement can be used as a way of stimulating innovation is that functional specification should be applied. Unlike technical specification, where the exact details of the item to be procured is defined, it is assumed that......, by specifying only the function or envisaged performance of the item to be procured, this would allow the submission of bids involving innovative technology and solutions previously unknown to the procurer. The starting point for the article is the perception that these views are commonly held assertions which...... have received limited systematic scholarly attention. The article therefore analyzes specification in relation to buying situations, as knowledge conversion, in terms of resource requirements in relation to different specification levels. The generic conclusion the paper arrives...

  10. Federal Procurement Standards Applied to School Food Services.

    Science.gov (United States)

    VanEgmond-Pannell, Dorothy

    1984-01-01

    Explains standards laid out in Federal Circular A-120 to ensure accountability, uniformity of standards, legal compliance, and efficiency in school food service procurement. Includes bidding and contract award procedures, contract compliance considerations, and cost-cutting methods. (MCG)

  11. A rational procedure for the selection of appropriate procurement ...

    African Journals Online (AJOL)

    Construction work is procured via a number of systems, such as being Open and ... routes for construction projects as a means to enhance the quality of management ... systems to decision-making procedures in the construction industry.

  12. Information sharing model in supporting implementation of e-procurement service: Case of Bandung city

    Science.gov (United States)

    Ramantoko, Gadang; Irawan, Herry

    2017-10-01

    This research examines the factors influencing the Information Sharing Model in Supporting Implementation of e-Procurement Services: Case of Bandung City in its early maturity stage. The early maturity of information sharing stage was determined using e-Government Maturity Stage Conceptual Framework from Estevez. Bandung City e-Procurement Information Sharing system was categorized at stage 1 in Estevez' model where the concern was mainly on assessing the benefit and risk of implementing the system. The Authors were using DeLone & McLean (D&M) Information System Success model to study benefit and risk of implementing the system in Bandung city. The model was then empirically tested by employing survey data that was collected from the available 40 listed supplier firms. D&M's model adjusted by Klischewski's description was introducing Information Quality, System Quality, and Service Quality as independent variable; Usability and User Satisfaction as intermediate dependent variable; and Perceived Net Benefit as final dependent variable. The findings suggested that, all of the predictors in D&M's model significantly influenced the net perceived benefit of implementing the e-Procurement system in the early maturity stage. The theoretical contribution of this research suggested that D&M's model might find useful in modeling complex information technology successfulness such as the one used in e-Procurement service. This research could also have implications for policy makers (LPSE) and system providers (LKPP) following the introduction of the service. However, the small number of respondent might be considered limitation of the study. The model needs to be further tested using larger number of respondents by involving the population of the firms in extended boundary/municipality area around Bandung.

  13. Procurement in the Nuclear Industry, Quality, Safety and Decision Making

    International Nuclear Information System (INIS)

    Jakobsson, Marianne; Svenson, Ola; Salo, Ilkka

    2010-03-01

    The major purpose of the present study is partly to map and partly to make an analysis of the decision processes in the procurement routines in the nuclear industry in order to provide a basis for: 1. further development of safety inspections about procurements for Swedish Radiation Safety Authority 2. improvements of safety management in connection with procurement within a nuclear-power plant, 3 improvements of procurement routines in general in a nuclear power plant. The procurement processes at a nuclear power plant were analyzed from a decision theoretic perspective. Key staff at the plant was interviewed and written instructions as well as digitalized processes were used in the analysis. The results illustrate the most important moments during the procurement process with descriptions from interviews and documents. The staff at the nuclear power plant used a multi-attribute utility decision theory MAUT-inspired model in evaluation of alternatives and both compensatory (in which negative aspects can be compensated by positive aspects) and non-compensatory (in which certain 'pass' levels of attributes have to be exceeded for a choice) decision rules were used in the procurement process. Not surprising, nuclear safety was evaluated in a non-compensatory manner following regulatory criteria while costs were evaluated in trade-off compensatory rules, which means that a weakness in one consideration might be compensated by strength in another consideration. Thus, nuclear safety above the regulator's and law requirements are not integrated in a compensatory manner when procurement alternatives are evaluated. The nuclear plant assessed an organization's safety culture at an early stage of the purchasing process. A successful and a less successful procurement case were reported with the lessons learned from them. We find that the existing written instructions for purchase were well elaborated and adequate. There is a lack of personal resources when procurement teams

  14. Insecticide susceptibility tests conducted in Kamhororo, Masakadza and Chilonga villages in Zimbabwe during the 2011 malaria period

    Directory of Open Access Journals (Sweden)

    N. Lukwa

    2012-12-01

    Full Text Available Insecticide susceptibility tests using World Health Organization papers treated with 4% dichloro-diphenyl-trichloro-ethane (DDT, 0.05% deltamethrin, 0.05% lambda-cyhalothrin, 0.5% etofenprox, 0.15% cyfluthrin and 0.75% permethrin were conducted in Kamhororo, Masakadza and Chilonga villages, Zimbabwe. Three to 5-day old female Anopheles gambiae sensu lato adult mosquitoes were used. Deltamethrin knocked down 100% of the mosquitoes from Kamhororo, Masakadza and Chilonga at 35 min exposure. DDT did not knock down 100% of the mosquitoes from Kamhororo and Masakadza but did so in Chilonga. One hundred percent knockdown was achieved for cyfluthrin when exposed to mosquitoes from Kamhororo (60 min, Masakadza (25 min and Chilonga (25 min. Etofenprox knocked down 100% of the mosquitoes collected from Kamhororo (30 min, Masakadza (30 min and Chilonga (55 min. Knockdown of mosquitoes due to deltamethrin, DDT, cyfluthrin, permethrin; lambda-cyhalothrin and etofenprox were different at different observation times. One hundred percent mortality due to deltamethrin, DDT, etofenprox, lambdacyhalothrin and cyfluthrin was recorded for mosquitoes collected from all the 3 sites. One hundred percent mortality due to pemethrin was recorded for mosquitoes collected from Kamhororo and Chilonga but mortality was 98.5% for those collected from Masakadza. No knockdown or mortality occurred in the controls from each locality. The kd50 (knockdown of 50% of the mosquitoes values were 24.4-73.7 min (DDT, 8-13 min (pemethrin, 9.4-16.3 min (cyfluthrin, 9.4-14.4 min (etofenprox, 8.7-13 min (lambda-cyhalothrin and 12.1-15.9 min (deltamethrin. The kd90 (knockdown of 90% of the mosquitoes values were 45.6-199.5 min (DDT, 14.7-26.5 min (pemethrin, 16.5-34.9 min (cyfluthrin, 21.8-24.4 min (etofenprox, 16.3-31.6 min (lambdacyhalothrin and 21-25.3 min (deltamethrin. No insecticide resistance was recorded from the 3 sites.

  15. Procurement Under The UNCITRAL Model Law: A Southern Africa Perspective

    OpenAIRE

    Stephen De La Harpe

    2015-01-01

    In Africa, economic integration, realised through regional integration, is seen as one of the driving factors that will improve the lives of its people. To enable regionalisation, economic growth and to unlock the potential of Africa its infrastructure will have to be improved. Infrastructure will on the whole be realised through public procurement. The stages for opening up procurement markets, referred to by Yukins and Schooner, is discussed and it is concluded that the states in SADC i...

  16. Procurement Under The UNCITRAL Model Law: A Southern Africa Perspective

    Directory of Open Access Journals (Sweden)

    Stephen De La Harpe

    2015-12-01

    Full Text Available In Africa, economic integration, realised through regional integration, is seen as one of the driving factors that will improve the lives of its people. To enable regionalisation, economic growth and to unlock the potential of Africa its infrastructure will have to be improved. Infrastructure will on the whole be realised through public procurement. The stages for opening up procurement markets, referred to by Yukins and Schooner, is discussed and it is concluded that the states in SADC is still in the initial stages of opening its public procurement markets for regional competition. Although COMESA is not yet in full compliance with all four the stages great strides have been made and have elements of all stages been addressed. Because of the influence the Model Law has already played in COMESA, and the rest of Africa, it would be contra productive should SADC not take the same route as COMESA. If regard is had to the four categories of procurement rules that serves as barriers to national procurement markets, as set out by Arrowsmith it is clear that all of these are present in most SADC member states. Also in the case of COMESA these barriers still exist albeit to a lesser extent. What is necessary is a phased approach to address all of these barriers. This will be possible under the UNCITRAL Model Law as the 2011 Model Law does provide for the possibility of complying with international obligations and for states to allow for socio economic objectives in their procurement regimes. There can be little doubt that the 1994 Model Law has already had a marked influence on public procurement regulation in Africa and that the 2011 Model Law will in future continue to do so. Public procurement is essential for economic development and is the integration and harmonisation thereof on a regional basis the first step In this regard SADC, and especially South Africa, has an important role to play.

  17. Corruption and innovation in the Albanian public procurement system

    OpenAIRE

    Reida Kashta

    2014-01-01

    This paper examines the measures and means used to fight against corruption in public procurement in Albania. Because public procurement is one of the key areas where the public sector and the private sector interact financially and this interaction is based on public money, it is a prime candidate for corrupt activity, cronyism and favoritism as well as outright bribery. The question marks that this paper raises are: what are the means used in the war against corruption in the public ...

  18. The government procurement agreement: Implications of economic theory

    OpenAIRE

    Mattoo, Aaditya

    1996-01-01

    This paper analyzes the provisions of the new Agreement on Government Procurement (GPA), drawing insights from trade theory and recent developments in the economics of information and law. A central conclusion is that in a world where imperfectly informed procurers purchase from imperfectly competitive firms on behalf of imperfectly informed tax-payers, it is not easy to devise rules which would be optimal in all situations. Nevertheless, the non-discriminatory provisions of the GPA seem to a...

  19. Environmental criteria in the Spanish Public Works Procurement Process

    OpenAIRE

    Fuentes Bargues, José Luis; González-Cruz, María-Carmen; González-Gaya, Cristina

    2017-01-01

    [EN] Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain g...

  20. Environmental Criteria in the Spanish Public Works Procurement Process

    OpenAIRE

    José Luis Fuentes-Bargues; Mª Carmen González-Cruz; Cristina González-Gaya

    2017-01-01

    Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group ...