  1. Type tests performed on a personnel dosimetry system according to IEC 61066

    International Nuclear Information System (INIS)

    Castillo, Romel; Huamanlazo, Paula; Rojas, Enrique

    2015-01-01

    In this study, the verification of the Harshaw 6600 Plus TLD personal dosimetry system was made using the method of the IEC-61066 type tests and the recommendations of the ISO 4037 standards. For this purpose, five dosimeters were irradiated over a water phantom using an irradiator with a 137 Cs source; five dosimeters as control were also used. The evaluated parameters were homogeneity, detection limit, residual reading, linearity, reproducibility, droppings and temperature and humidity variations. The obtained results show that the Harshaw 6600 TLD dosimetric system fulfills the IEC 61066 criteria. (author)

  2. IEC-TC88WG8 testing of rotor blades

    Energy Technology Data Exchange (ETDEWEB)

    Delft, D R.V. van [Delft Univ. of Technology, STEVIN Lab., Delft (Netherlands)

    1996-09-01

    In 1994 the TC88 of IEC installed a working group (WG8) to draft a guideline on blade testing. This paper gives a description of the task of the working group. Furthermore it gives a report of the progress of the work and summarizes the possible contents of the working group document on blade testing. (au)

  3. [Approval of ISO/IEC 17025 and quality control of laboratory testing].

    Science.gov (United States)

    Yamamoto, Shigeki; Asakura, Hiroshi; Machii, Kenji; Igimi, Shizunobu

    2010-01-01

    First section of Division of Biomedical Food Research, National Institute of Health Sciences (NIHS) was approved by ISO/IEC 17025 as a laboratory having an appropriate laboratory testing technique. NIHS is the first national laboratory approved by ISO/IEC 17025. NIHS has also been accepted the appropriate technique and facility for the BSL3 level pathogens by ISO/IEC 17025. NIHS is necessary to take an external audit almost every year. This approval is renewed every 4 years.

  4. QA Programme of the TLD laboratory of the University of Costa Rica: IEC 61066 testing

    International Nuclear Information System (INIS)

    Mora, Patricia; Porras Chaverria, Mariela

    2008-01-01

    The Thermoluminescence Personal Dosimetry Laboratory of the University of Costa Rica provides dose measurements for around 90% of occupational radiation workers in the country. The assessment of doses to workers routinely exposed to external sources of radiation constitutes an integral part of any radiation protection programme and helps national authorities to ensure acceptably safe and satisfactory radiological conditions in workplaces. Harshaw Readers Model 4000 and 4500, dosimeter holders Type 8814 with TLD-100 in 0110 cards and loose TLD-100 chips are used to monitor personal dose equivalent, Hp(10) and Hp(0.07). In order to provide a reliable measurement of the operational quantities, a study was undertaken to verify the fulfillment of international requirements in our system (Model 4500 with cards) against the Thermoluminescence dosimetry systems for personal and environmental monitoring CEI IEC 61066 (1991 -2012). The type tests performed were nine in total: batch homogeneity, reproducibility, linearity, detection threshold, effect of climate conditions on reader, effect of light exposure on dosimeters, isotropy, transient voltage and dropping on dosimeters. A Cesium-137 source was used to irradiate the dosimeters and all procedures follow the indications given on the standard. Results showed that all IEC criteria were met by our Laboratory. Acceptable uncertainties were also studied under the ICRP recommendations; the analysis of the Trumpet Curve was done with satisfactory results (for doses above 0.5 mSv; quotient of measure to real dose less than 3%). For purposes of accreditation (ISO/IEC 17025:2005) and performance testing this work is very relevant since the University of Costa Rica wants to establish a solid individual monitoring programme for external radiation exposure that will provide users, registrants, licensees and regulatory bodies with information that can be used for the optimization of protection and dose limitation of Costa Rican workers

  5. Use of the TEM Cell for Compliance Testing of Emissions and Immunity, an IEC Perspective

    DEFF Research Database (Denmark)

    Bentz, Sigurd

    1996-01-01

    The current work of the IEC on preparing a standard for the use of TEM cells for compliance testing of emissions and immunity is reviewed. The requirements of TEM cells are related to the established procedures: “open area test site” and “shielded enclosure with area of uniform field”, respective...

  6. Wind power communication design and implementation of test environment for IEC61850/UCA2

    Energy Technology Data Exchange (ETDEWEB)

    Johnsson, A.; Svensson, J.

    2002-04-01

    Elforsk has sponsored a joint Swedish-Danish project aiming at finding and recommend a common solution for communication with wind power plants. The first stage of the work resulted in a requirement specification Functional Requirements on Communication System for Wind Turbine Applications. During the project a number of possible communication solutions were identified. The two most promising solutions have been tested in order to verify to what extent they fulfil the requirements in the specification. A version of the IEC 61850 standard based on the communication protocol MMS, has been tested at a wind power plant at Gotland, Sweden, and an OPC-interface has been tested in Denmark. This report includes a description of the design choices made for the test implementation of MMS, as well as a detailed description of the implementation of the IEC 61850/UCA2 software including information models and information exchange services. (BA)

  7. ISO/IEC 17025–2017 "New requirements to the competence of test and calibration laboratories"

    Directory of Open Access Journals (Sweden)

    Baranova P. O.

    2018-05-01

    Full Text Available due to the continuous improvement of the regulatory framework, there is a growing demand for laboratory centers that provide services in the field of testing. The relevance of the topic lies in the transition of laboratories to the new version of ISO/IEC 17025–2017 «General requirements for the competence of test and calibration laboratories». The article compares two versions of the standard, reveals differences and similarities. And changes in the gradation of changes are also highlighted.

  8. Characterization of a PET-NEMA/IEC body phantom for quality control tests of PET/CT equipment

    International Nuclear Information System (INIS)

    Oliveira, Cassio M.; Vieira, Igor F.; Lima, Fernando R.A.; Sa, Lidia V. de

    2011-01-01

    The Brazilian Sanitary Agency from Ministry of Health requires that all PET/CT equipment must undergo minimal quality control tests using manufacturer simulators. The PET-NEMA/IEC body phantom is recommended by the IEC and NEMA to perform acceptance testing and quality control in PET/CT equipment according to specific protocols. It is essential that all simulator components (spheres and body) are properly characterized in relation to their size and internal structure volumes, since they are used to calculate the overall activity concentration and the total weight. The objective of this work was characterize a PET-NEMA/IEC body phantom for the true reconstruction in computational modeling and correct analysis of experimental results. The simulator is basically composed of three structures: the body (simulating a portion of the chest), an inner cylinder (simulating the lung tissue) and a top cover in which are coupled spheres of different sizes simulating 'hot' (tumors) and cold lesions. The spheres were evaluated in terms of volume. The same evaluations were performed with the body of the simulator and the inner cylinder, beyond of analysis of their weights (filled with water) and wall thickness. The data showed that the total weight of the simulator with all its internal structures is 12.5 kg and the volume of the 'hot' and 'cold' spheres are approximately equal to those presented by the manufacturer. The inner cylinder volume showed a significant difference between the measured and the presented in the manual. The results were used for reconstruction of the simulator in computational modeling using the code GATE. (author)

  9. Concept for a high performance MHD airbreathing-IEC fusion rocket

    International Nuclear Information System (INIS)

    Froning, H.D. Jr.; Miley, G.H.; Nadler, J.; Shaban, Y.; Momota, H.; Burton, E.

    2001-01-01

    Previous studies have shown that Single-State-to-Orbit (SSTO) vehicle propellant can be reduced by Magnets-Hydro-Dynamic (MHD) processes that minimize airbreathing propulsion losses and propellant consumption during atmospheric flight, and additional reduction in SSTO propellant is enabled by Inertial Electrostatic Confinement (IEC) fusion, whose more energetic reactions reduce rocket propellant needs. MHD airbreathing propulsion during an SSTO vehicle's initial atmospheric flight phase and IEC fusion propulsion during its final exo-atmospheric flight phase is therefore being explored. Accomplished work is not yet sufficient for claiming such a vehicle's feasibility. But takeoff and propellant mass for an MHD airbreathing and IEC fusion vehicle could be as much as 25 and 40 percent less than one with ordinary airbreathing and IEC fusion; and as much as 50 and 70 percent less than SSTO takeoff and propellant mass with MHD airbreathing and chemical rocket propulsion

  10. Concept for a high performance MHD airbreathing-IEC fusion rocket

    Science.gov (United States)

    Froning, H. D.; Miley, G. H.; Nadler, J.; Shaban, Y.; Momota, H.; Burton, E.

    2001-02-01

    Previous studies have shown that Single-State-to-Orbit (SSTO) vehicle propellant can be reduced by Magnets-Hydro-Dynamic (MHD) processes that minimize airbreathing propulsion losses and propellant consumption during atmospheric flight, and additional reduction in SSTO propellant is enabled by Inertial Electrostatic Confinement (IEC) fusion, whose more energetic reactions reduce rocket propellant needs. MHD airbreathing propulsion during an SSTO vehicle's initial atmospheric flight phase and IEC fusion propulsion during its final exo-atmospheric flight phase is therefore being explored. Accomplished work is not yet sufficient for claiming such a vehicle's feasibility. But takeoff and propellant mass for an MHD airbreathing and IEC fusion vehicle could be as much as 25 and 40 percent less than one with ordinary airbreathing and IEC fusion; and as much as 50 and 70 percent less than SSTO takeoff and propellant mass with MHD airbreathing and chemical rocket propulsion. .

  11. Maintaining and assessing extended 9 test methods in accordance with ISO/IEC 17025: 2005 for Isotopes Hydrology Laboratory

    International Nuclear Information System (INIS)

    Nguyen Thi Hong Thinh; Ha Lan Anh; Vo Thi Anh; Tran Khanh Minh; Vu Hoai

    2016-01-01

    The ISO/IEC 17025:2005 ''General requirements for the competence of testing and calibration laboratories'' is basis for the accreditation body of the country in general and VILAS in particular recognizing the competence of laboratories. With the desire to prove that we have sufficient technique and management capacity , and the ability to provide the legally recognized and technically valuable test results, the Isotope Hydrology Laboratory have developed and maintain a quality management system in accordance with ISO/IEC 17025:2005. In 2013, Isotope Hydrology Laboratory received a certificate of accreditation issued by Bureau of Accreditation which recognized the laboratory in accordance with ISO/IEC 17025:2005 with VILAS 670 accredited code. Scope of recognition is analyzed 14 parameters: F"-, Cl"-, NO_2"-, NO_3"-, Br"-, PO_4"3"-, SO_4"2"-, Li"+, Na"+, NH_4"+, K"+, Mg"2"+, Ca"2"+ and "3H in water by ion chromatography and liquid scintillator counting method. The laboratory has successfully implemented the task of maintaining quality management systems conform to ISO/IEC 17025: 2005 and expanded the scope of accreditation by 9 parameters in water: pH, EC, TSS, TDS, DO, BOD5, pH, Fe and Mn in 2015. (author)

  12. Excerpt from: Testing of radiotherapy dosimeters in accordance with specifications given by IEC publication 731 (1982)

    International Nuclear Information System (INIS)

    Jaervinen, Hannu; Rantanen, Erkii; Jokela, Kari

    1986-01-01

    In their position as centres for expertise in radiation dosimetry and its applications, the Secondary Standard Dosimetry Laboratories (SSDLs) are expected to advise the radiation users, the radiotherapy centres in particular, in selection and use of the most suitable dosimetric equipment. Various dosimeters are commercially available, but objective information on their fundamental technical characteristics is lacking. Such information would be valuable and necessary for the SSDLs to be able to judge the accuracy and reliability of the many choices which exist for a given application. The results of systematic evaluations of dosimeters in a recognized SSDL (or SSDLs) could be helpful supplementary information to the other SSDLs and to the radiation users. In 1983 The Finnish Centre for Radiation and Nuclear Safety (STUK; old name: Institute of Radiation Protection) and the International Atomic Energy Agency (IAEA) made a research contract, the purpose of which was to test selected dosimeters for use in radiotherapy in accordance with the specifications by the International Electrotechnical Commission (IEC)

  13. IEC 61850 and IEC 62351 Cyber Security Acceleration Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Clements, Samuel L.; Edgar, Thomas W.; Manz, David O.

    2012-04-01

    The purpose of this workshop was to identify and discuss concerns with the use and adoption of IEC 62351 security standard for IEC 61850 compliant control system products. The industry participants discussed performance, interoperability, adoption, challenges, business cases, and future issues.

  14. Power Performance Test Report for the SWIFT Wind Turbine

    Energy Technology Data Exchange (ETDEWEB)

    Mendoza, I.; Hur, J.

    2012-12-01

    This report summarizes the results of a power performance test that NREL conducted on the SWIFT wind turbine. This test was conducted in accordance with the International Electrotechnical Commission's (IEC) standard, Wind Turbine Generator Systems Part 12: Power Performance Measurements of Electricity Producing Wind Turbines, IEC 61400-12-1 Ed.1.0, 2005-12. However, because the SWIFT is a small turbine as defined by IEC, NREL also followed Annex H that applies to small wind turbines. In these summary results, wind speed is normalized to sea-level air density.

  15. IEC Newsletter, No. 53/3 (2015)

    International Nuclear Information System (INIS)

    2015-12-01

    The IEC Newsletter is prepared by the Incident and Emergency Centre (IEC), Department of Nuclear Safety and Security of the IAEA. The Incident and Emergency Centre (IEC) is the global focal point for emergency preparedness and response for nuclear and radiological safety or security related incidents, emergencies, threats or events of media interest. The IEC is also the world’s centre for coordination of international assistance in emergency. The following topics are presented in this newsletter: Prepared to Respond International Conference on Global EPR; Launch of EPRIMS; First meeting of EPR Standards Committee; IEC and French experts test assessment and prognosis arrangements; IEC and Swiss counterparts conduct an assessment and prognosis drill; Consultancy on CANDUspecific EALs; Regional Workshops; Recently reported events; Member State preparedness; IEC welcomes young visitors on Bring Your Children to Work day

  16. From IEC 61131 to IEC 61499 for Distributed Systems: A Case Study

    Directory of Open Access Journals (Sweden)

    Christian Gerber

    2008-02-01

    Full Text Available A new concept for distributed control systems based on the new IEC 61499 standard is tested in this work in cooperation with LAE Engineering GmbH, a medium-sized company. Based on a catalogue of requirements, a customer-related testbed is developed. In the following this testbed is used as a reference to realise an IEC 61499 compliant-distributed control system based on PC technics. By doing this, rules are defined to convert user-owned IEC 61131 function blocks to IEC 61499 compliant function blocks. Concluding, some trends for IEC 61499-based distributed control systems will be summarised.

  17. Inertial Electrostatic Confinement (IEC) devices

    International Nuclear Information System (INIS)

    Nebel, R.A.; Turner, L.; Tiouririne, T.N.; Barnes, D.C.; Nystrom, W.D.; Bussard, R.W.; Miley, G.H.; Javedani, J.; Yamamoto, Y.

    1994-01-01

    Inertial Electrostatic Confinement (IEC) is one of the earliest plasma confinement concepts, having first been suggested by P. T. Farnsworth in the 1950s. The concept involves a simple apparatus of concentric spherical electrostatic grids or a combination of grids and magnetic fields. An electrostatic structure is formed from the confluence of electron or ion beams. Gridded IEC systems have demonstrated neutron yields as high as 2 * 10 10 neutrons/sec. These systems have considerable potential as small, inexpensive, portable neutron sources for assaying applications. Neutron tomography is also a potential application. Atomic physics effects strongly influence the performance of all of these systems. Important atomic effects include elastic scattering, ionization, excitation, and charge exchange. This paper discusses how an IEC system is influenced by these effects and how to design around them. Theoretical modeling and experimental results are presented

  18. A multi-function IEC 61850 packet generator based on FPGA

    International Nuclear Information System (INIS)

    Wei, Wei; Li, Hong-bin; Cheng, Han-miao

    2016-01-01

    An IEC 61850 packet generator is used to produce IEC 61850-9-2 packets by simulating the merging unit and testing the IEC 61850 digital device. While the existing IEC packet generator can produce ideal digital without any noise, it does not take into account the fact that the merging unit output signal packets will be inevitably superimposed with noise. Since the International Electrical Commission standard of the electronic current transformer specifies the minimum output signal-to-noise ratio of the merging unit to be 30 dB, and the signal superimposed with noise will influence the operation performance of the digital device, it is necessary to design a multi-function IEC 61850-9-2 packet generator for a digital device test. Therefore, in this paper, a multi-function IEC 61850 packet generator has been developed, which not only can output various IEC 61850-9-2 packets, but also can add white Gaussian noise to the signal for digital device testing. By testing three digital electricity meters from different manufacturers, we showed that the error of the digital electricity meter is significantly larger when the signal packet is superimposed with noise. Also when the signal-to-noise ration is 30 dB, the error of one of the meters exceeds the allowed range of the accuracy class. This indicates that the noise testing and the noise setting function of the system has an important role in the testing of a digital device. (paper)

  19. Cause analysis for unsatisfactory results in proficiency testing activities: a case study of Brazilian calibration laboratories accredited under ISO/IEC 17025:2005⋆

    Directory of Open Access Journals (Sweden)

    Silva M.A.F.

    2013-01-01

    Full Text Available This work presents the results of a survey carried out among Brazilian calibration laboratories accredited under ISO/IEC 17025:2005 with the objective to identify how these laboratories investigate the root causes of unsatisfactory results in proficiency testing. The survey was coordinated by the Brazilian accreditation body, the General Coordination for Accreditation (Cgcre, of the Institute of Metrology, Quality and Technology (Inmetro.

  20. Accreditation - ISO/IEC 17025

    Science.gov (United States)

    Kaus, Rüdiger

    This chapter gives the background on the accreditation of testing and calibration laboratories according to ISO/IEC 17025 and sets out the requirements of this international standard. ISO 15189 describes similar requirements especially tailored for medical laboratories. Because of these similarities ISO 15189 is not separately mentioned throughout this lecture.

  1. Changes in IEC standards related to diagnostic radiology

    International Nuclear Information System (INIS)

    Porubszky, T.; Barsai, J.

    2007-01-01

    Complete test of publication follows. Purposes. Technical Committee TC62 of International Electrotechnical Commission (IEC) deals with medical electrical equipment (i.e. medical devices using electricity). Standardization concerning diagnostic radiology equipment is task of its Sub-Committee SC62B. An outlook of its activities and present situation, and especially of radiation protection aspects, is given. Materials and methods. Third edition of basic safety standard for medical electrical equipment IEC 60601-1 was issued in 2005. Elaboration of new collateral and particular standards - applicable together with it - is in progress. These standards are generally at the same time also European - EN - and national standards. There is a great importance of radiation protection in diagnostic X-ray equipment. Collateral standard IEC 6060-1-3 about it was at first issued in 1994. Rapid development of imaging technology demands updating of requirements. SC62B in 2003 founded a maintenance team MT37 for preparation of the second edition of this standard. According to new safety philosophy of IEC all modality specific requirements are to be collected in 'safety and essential performance' particular standards. A new working group WG42 - founded in 2006 - elaborates a new particular standard IEC 60601-2-54 for radiographic and radioscopic equipment. Maintenance team MT32 deals with safety and performance standards for X-ray tube assemblies. The authors actively participate in these activities. Results and discussion. Present and future system of diagnostic radiology IEC standards and some interesting details are presented. Conclusions. International standards - although they are not 'obligatory' - are generally the basis of safety and performance certification of diagnostic radiology equipment and often also of their quality assurance.

  2. Wind Turbine Generator System Power Performance Test Report for the ARE442 Wind Turbine

    Energy Technology Data Exchange (ETDEWEB)

    van Dam, J.; Jager, D.

    2010-02-01

    This report summarizes the results of a power performance test that NREL conducted on the ARE 442 wind turbine. This test was conducted in accordance with the International Electrotechnical Commission's (IEC) standard, Wind Turbine Generator Systems Part 12: Power Performance Measurements of Electricity Producing Wind Turbines, IEC 61400-12-1 Ed.1.0, 2005-12. However, because the ARE 442 is a small turbine as defined by IEC, NREL also followed Annex H that applies to small wind turbines. In these summary results, wind speed is normalized to sea-level air density.

  3. Analysis of a provider of proficiency testing by interlaboratory comparisons for dosimetry in function of guides ISO/IEC 43 and ILAC G13

    International Nuclear Information System (INIS)

    Lohr, J.; Zaretzky, Alba; Stefanic, Amalia M.; Saravi, M.

    2009-01-01

    The Ionising Radiation Dosimetry Group (CNEA) has participated of the last intercomparison scheme organized by EUROMET. This intercomparison was held starting 2005 until 2008.The objective of this paper is to analyze this Association as a proficiency test provider according to the ISO/IEC Guide 43 (1997) 'Proficiency testing by interlaboratory comparisons' and ILAC G13 Guide (2007) 'Guidelines for the Requirements for the Competence of Providers of Proficiency Testing Schemes'. The analysis of EURAMET (so called since 2007) as the provider of this dosimetric comparison was made taking into account the following sections of the ILAC G13 Guide: Conduct of proficiency testing schemes; Statistical design, Communication with participants and Reports, taking them as essential parameters of the compliance of a proficiency test provider with the general requirements set by the Guides. This intercomparison had special characteristics coming from the participants and the primary objective of the scheme. It is remarkable the important degree of agreement of the organization with Guides ISO/IEC 43 and ILAC G13. (author)

  4. Critical issues for implementation of the standard NBR ISO/IEC 17025:2005 in Testing and Calibration Laboratory: case study at a public institution

    International Nuclear Information System (INIS)

    Castro, Denise Confar Carvalho de

    2013-01-01

    The public institution aims to promote excellence in public management to contribute to the quality of services provided to its customers and to increase competitiveness in the country, as well as its international projection. A technical barrier to trade that can lead to dissatisfaction and achieve the reputation of the institution is failing the test or calibration results and measurement data, thereby accreditation is regarded as the first essential step to facilitate the mutual acceptance of test results and calibration or measurement data. For recognition, laboratories need to demonstrate full compliance with both the sections of ISO/IEC 17025:2005, i.e. management and technical requirements. This research aims to discuss the critical aspects for implementation of ABNT NBR ISO / IEC 17025:2005 for calibration and testing of a Public Institution seeking accreditation of its laboratories with INMETRO, national accreditation body Laboratories. Besides getting preventive, corrective and improvement actions continues guidelines. Furthermore, the methodology used was to conduct a literature search and apply a questionnaire to identify the degree of agreement / disagreement of the foundations of the standard servers. Analysis of the results showed that the critical issues were: commitment, training, resources (infrastructure, human) and culture. (author)

  5. Developing IEC prototypes for adolescents. IEC workshop.

    Science.gov (United States)

    1997-01-01

    Participants of the IEC Workshop for the Production of OHP Material on Reproductive Health for Adolescents and Young Adults held November 25-30 in Japan developed innovative, visually appealing overhead projector (OHP) transparencies to serve as prototype information, education, and communication (IEC) materials for the Asian Region. The materials cover a wide range of topics from early marriage to unwanted pregnancy. This paper briefly describes the prototypes. One group focused upon early marriage, an issue of considerable importance to the health and welfare of young women in countries such as Bhutan, India, and Nepal. Participants from China, Laos, Malaysia, and Thailand focused upon the issue of gender equality, while a third group developed OHP material to teach a range of issues related to young people's sexual and reproductive health. Finally, the fourth group, drawn from Indonesia, the Philippines, and Vietnam, focused upon the topic of menstruation with a prototype targeted to boys and girls aged 9-14 years. Boys were included to foster their understanding of menstruation as a natural phenomenon.

  6. WhalePower tubercle blade power performance test report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-15

    Toronto-based WhalePower Corporation has developed turbine blades that are modeled after humpback whale flippers. The blades, which incorporate tubercles along the leading edge of the blade, have been fitted to a Wenvor 25 kW turbine installed in North Cape, Prince Edward Island at a test site for the Wind Energy Institute of Canada (WEICan). A test was conducted to characterize the power performance of the prototype wind turbine. This report described the wind turbine configuration with particular reference to turbine information, power rating, blade information, tower information, control systems and grid connections. The test site was also described along with test equipment and measurement procedures. Information regarding power output as a function of wind speed was included along with power curves, power coefficient and annual energy production. The results for the power curve and annual energy production contain a level of uncertainty. While measurements for this test were collected and analyzed in accordance with International Electrotechnical Commission (IEC) standards for performance measurements of electricity producing wind turbines (IEC 61400-12-1), the comparative performance data between the prototype WhalePower wind turbine blade and the Wenvor standard blade was not gathered to IEC data standards. Deviations from IEC-61400-12-1 procedures were listed. 6 tabs., 16 figs., 3 appendices.

  7. Assuring the Quality of Test Results in the Field of Nuclear Techniques and Ionizing Radiation. The Practical Implementation of Section 5.9 of the EN ISO/IEC 17025 Standard

    Science.gov (United States)

    Cucu, Daniela; Woods, Mike

    2008-08-01

    The paper aims to present a practical approach for testing laboratories to ensure the quality of their test results. It is based on the experience gained in assessing a large number of testing laboratories, discussing with management and staff, reviewing results obtained in national and international PTs and ILCs and exchanging information in the EA laboratory committee. According to EN ISO/IEC 17025, an accredited laboratory has to implement a programme to ensure the quality of its test results for each measurand. Pre-analytical, analytical and post-analytical measures shall be applied in a systematic manner. They shall include both quality control and quality assurance measures. When designing the quality assurance programme a laboratory should consider pre-analytical activities (like personnel training, selection and validation of test methods, qualifying equipment), analytical activities ranging from sampling, sample preparation, instrumental analysis and post-analytical activities (like decoding, calculation, use of statistical tests or packages, management of results). Designed on different levels (analyst, quality manager and technical manager), including a variety of measures, the programme shall ensure the validity and accuracy of test results, the adequacy of the management system, prove the laboratory's competence in performing tests under accreditation and last but not least show the comparability of test results. Laboratory management should establish performance targets and review periodically QC/QA results against them, implementing appropriate measures in case of non-compliance.

  8. Assuring the Quality of Test Results in the Field of Nuclear Techniques and Ionizing Radiation. The Practical Implementation of Section 5.9 of the EN ISO/IEC 17025 Standard

    International Nuclear Information System (INIS)

    Cucu, Daniela; Woods, Mike

    2008-01-01

    The paper aims to present a practical approach for testing laboratories to ensure the quality of their test results. It is based on the experience gained in assessing a large number of testing laboratories, discussing with management and staff, reviewing results obtained in national and international PTs and ILCs and exchanging information in the EA laboratory committee.According to EN ISO/IEC 17025, an accredited laboratory has to implement a programme to ensure the quality of its test results for each measurand. Pre-analytical, analytical and post-analytical measures shall be applied in a systematic manner. They shall include both quality control and quality assurance measures.When designing the quality assurance programme a laboratory should consider pre-analytical activities (like personnel training, selection and validation of test methods, qualifying equipment), analytical activities ranging from sampling, sample preparation, instrumental analysis and post-analytical activities (like decoding, calculation, use of statistical tests or packages, management of results).Designed on different levels (analyst, quality manager and technical manager), including a variety of measures, the programme shall ensure the validity and accuracy of test results, the adequacy of the management system, prove the laboratory's competence in performing tests under accreditation and last but not least show the comparability of test results.Laboratory management should establish performance targets and review periodically QC/QA results against them, implementing appropriate measures in case of non-compliance

  9. Improving the quality control program for patient dose calibrator according to IEC 60580

    International Nuclear Information System (INIS)

    Costa, Nathalia Almeida; Potiens, Maria da Penha Albuquerque

    2013-01-01

    The objective of this work was to improve the program quality control of this equipment based on the International Standard IEC 60580 - Medical electrical equipment - Dose area product meters . The initial program was established following the recommendations of IEC 61674 quoting dosimeters with ionization chambers and / or semiconductor detectors used in diagnostic X-ray image, however, the IEC 60580 is referred specifically to gauges and KAP (kerma-area product) presents additional tests. Tests included: intrinsic relative error, repeatability, scanning resolution, settling time, restarting, float values, response time and spatial uniformity of response. As a rule, all measurements are within the range characteristic of equipment performance. Thus, the PDC (Patient Dose Calibrator) again shows a device with excellent functionality and reliability in characterization tests carried out to quality control as( for the test in clinical PKA meters

  10. Adaptive Micro-Grid Operation Based on IEC 61850

    Directory of Open Access Journals (Sweden)

    Wei Deng

    2015-05-01

    Full Text Available Automatically identifying the new equipment after its integration and adjusting operation strategy to realize “plug and play” functionality are becoming essential for micro-grid operations. In order to improve and perfect the micro-grid “plug and play” function with the increased amount of equipment with different information protocols and more diverse system applications, this paper presents a solution for adaptive micro-grid operation based on IEC 61850, and proposes the design and specific implementation methods of micro-grid “plug and play” function and system operation mode conversion in detail, by using the established IEC 61850 information model of a micro-grid. Actual operation tests based on the developed IED and micro-grid test platform are performed to verify the feasibility and validity of the proposed solution. The tests results show that the solution can automatically identify the IEC 61850 information model of equipment after its integration, intelligently adjust the operation strategies to adapt to new system states and achieves a reliable system operation mode conversion.

  11. Standard IEC 61850 substation automation

    Energy Technology Data Exchange (ETDEWEB)

    Bricchi, A.; Mezzadri, D. [Selta, Tortoreto (Italy)

    2008-07-01

    The International Electrotechnical Commission (IEC) 61850 standard is the reference communication protocol for all electrical substations protection and control systems. It creates models of all the elements and functionalities of an electrical substation, including physical elements such as switches or circuit breakers, as well as protection, control and monitoring functionalities. Network managers need to renew power substation automation and control systems in order to improve the efficiency and quality of services offered by electric utilities. Selta has proposed a new integrated solution for the automation of power substations which is fully compliant with the IEC 61850 norms. The solution involves the integration of control, automation, protection, monitoring and maintenance functions and applies leading edge technology to its systems, particularly for the TERNA network. The system is based on the use of many electronic devices at a power plant, each one with a specialized function, and all interconnected via a Station LAN. This solution, was tested on the TERNA network in Italy, in VHV and HV stations. It was shown to offer many advantages, such as an architecture based on full interoperability between control, monitoring and protection equipment; centralized and distributed automation; a LAN station that allows full interoperability between different bay units and protection relays in order to integrate equipment from various suppliers; the integration of automation systems in existing bay units and protection relays equipped with standard communication buses or with proprietary interfaces; and time synchronization for the entire system through a station GPS reception system. 10 refs., 1 tab., 7 figs.

  12. Commercial IEC portable neutron source

    International Nuclear Information System (INIS)

    Sved, J.

    1997-01-01

    The inertial electrostatic confinement (IEC) fusion grade plasma devices are being developed as a commercial industrial product by Daimler-Benz Aerospace (DASA), Center Trauen, which has an exclusive license from the University of Illinois (UI) to manufacture the commercial implementation of the Miley et al. IEC inventions. DASA is funding the UI Fusion Studies Laboratory basic IEC research and the intellectual property protection process. The association of the DASA Space Infrastructure division with an apparently unrelated technology has arisen from the perception that IEC technology may benefit from certain aerospace technologies and eventually create a market for space infrastructure services. In addition, DASA Center Trauen has a number of environmental technology businesses

  13. Characterization of a test device for determination of the half value layer and of filtration with quality equity of materials in accordance with standard ABNT NBR IEC 60601-1-3

    International Nuclear Information System (INIS)

    Viana, Vlamir

    2012-01-01

    The motivation of this work was the development and validation of a device to perform the tests established by ABNT NBR IEC 60601-1-3 versions published in 2001 and 2011. The purpose of the tests is to determine the half-value layer – HVL and filtration with equivalent filtration quality in mmAl, materials that intercept the X-ray beam from their emission to the X-ray image receiving device. This filtration includes all the materials present in radiation source assembly, formed by the x-ray tube housing with x-ray tube inserted, the collimator (inherent filtration) and by materials present in the patients support, as Table and wall bucky, both incorporate image receiving device which is also evaluated. In the development was taken in consideration the routine of tests execution routine, in order to reduce the operator interaction with the system and in order to reduce the human factor in the execution, reflecting directly on the measurement uncertainty, in the runtime reduction of the runtime and radiation safety. The device was validated with respect to: a) Effect of positioning and distribution of the filters in the filter changer device; b) Influence of purity of the aluminum filter used in the device, and c) Comparison tests carried out with the testing device with respect to the tests carried out with a reference X-ray generator. (author)

  14. Quality assurance procedures in radiotherapy - IEC specifications for equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rassow, J; Klieber, E

    1986-08-01

    The International Electrotechnical Commission (IEC) worked out international standards for requirements and tests of electrical, mechanical and radiation safety as well as for definition and tests of functional performance characteristics of radiotherapy equipments (medical electron accelerators, gamma beam teletherapy and afterloading equipments, simulators and accessories) and for clinical dosimeters and terminology for medical radiology. A survey is given on the actual state of standardization projects. The problems of such standards are shown for the standard for functional performance characteristics of medical electron accelerators as example.

  15. Quality assurance procedures in radiotherapy - IEC specifications for equipment

    International Nuclear Information System (INIS)

    Rassow, J.; Klieber, E.

    1986-01-01

    The International Electrotechnical Commission (IEC) worked out international standards for requirements and tests of electrical, mechanical and radiation safety as well as for definition and tests of functional performance characteristics of radiotherapy equipments (medical electron accelerators, gamma beam teletherapy and afterloading equipments, simulators and accessories) and for clinical dosimeters and terminology for medical radiology. A survey is given on the actual state of standardization projects. The problems of such standards are shown for the standard for functional performance characteristics of medical electron accelerators as example. (orig.) [de

  16. Interpretation of MS ISO/ IEC 17020

    International Nuclear Information System (INIS)

    Mohamad Pauzi Ismail

    2012-01-01

    MS ISO/ IEC 17020 is an international standard which adopted by Malaysian Standard states the requirement criteria for inspection bodies. The author involved in the NDT technical assessment to several NDT companies in Malaysia. The experience in performing NDT assessment activity is explained and discussed. (author)

  17. Standardization of test conditions for gamma camera performance measurement

    International Nuclear Information System (INIS)

    Jordan, K.

    1982-02-01

    The way of measuring gamma camera performance is to use point sources or flood sources in air, often in combination with bar phantoms. This method has nothing in common with the use of a camera in clinical practice. Particularly in the case of low energy emitters, like Tc-99m, the influence of scattered radiation over the performance of cameras is very high. The IEC document 'Characteristics and test conditions of radionuclide imaging devices' is discussed

  18. Harmonization of IEEE323 and IEC60780 standards For Environmental Qualificaiton of Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Jong Seog

    2009-01-01

    IEEE323 standard has been widely used for the qualification of electric equipment in Asian pacific area while IEC6070 has been mostly used in European area. Since each plant use different standard for environmental qualification, manufacturer has to perform the qualification test twice in accordance with each standard. Problem also can be happened in the plant site when they are going to purchase equipment qualified by different qualification standard which are not used in his plant. The need of harmonization of each standard has been raised several years and it is known that some studies are in progress by IEEE committee. KEPRI has a plan of comparing EQ relative standards of IEEE, IEC and RCC in 2009. In this paper, brief comparing result between IEEE323 and IEC60780 and the proper harmonization method is introduced

  19. Implementation of the OECD principles of good laboratory practice in test facilities complying with a quality system accredited to the ISO/IEC 17025 standard.

    Science.gov (United States)

    Feller, Etty

    2008-01-01

    Laboratories with a quality system accredited to the ISO/IEC 17025 standard have a definite advantage, compared to non-accredited laboratories, when preparing their facilities for the implementation of the principles of good laboratory practice (GLP) of the Organisation for Economic Co-operation and Development (OECD). Accredited laboratories have an established quality system covering the administrative and technical issues specified in the standard. The similarities and differences between the ISO/IEC 17025 standard and the OECD principles of GLP are compared and discussed.

  20. Textiles Performance Testing Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — The Textiles Performance Testing Facilities has the capabilities to perform all physical wet and dry performance testing, and visual and instrumental color analysis...

  1. Critical issues for implementation of the standard NBR ISO/IEC 17025:2005 in Testing and Calibration Laboratory: case study at a public institution; Aspectos criticos para implantacao da norma NBR ISO/IEC 17025:2005 em laboratorio de ensaio e calibracao: estudo de caso em uma instituicao publica

    Energy Technology Data Exchange (ETDEWEB)

    Castro, Denise Confar Carvalho de

    2013-07-01

    The public institution aims to promote excellence in public management to contribute to the quality of services provided to its customers and to increase competitiveness in the country, as well as its international projection. A technical barrier to trade that can lead to dissatisfaction and achieve the reputation of the institution is failing the test or calibration results and measurement data, thereby accreditation is regarded as the first essential step to facilitate the mutual acceptance of test results and calibration or measurement data. For recognition, laboratories need to demonstrate full compliance with both the sections of ISO/IEC 17025:2005, i.e. management and technical requirements. This research aims to discuss the critical aspects for implementation of ABNT NBR ISO / IEC 17025:2005 for calibration and testing of a Public Institution seeking accreditation of its laboratories with INMETRO, national accreditation body Laboratories. Besides getting preventive, corrective and improvement actions continues guidelines. Furthermore, the methodology used was to conduct a literature search and apply a questionnaire to identify the degree of agreement / disagreement of the foundations of the standard servers. Analysis of the results showed that the critical issues were: commitment, training, resources (infrastructure, human) and culture. (author)

  2. Information security in accordance with ISO/IEC 27000

    OpenAIRE

    Košćak , Damjan

    2011-01-01

    The diploma assignment discusses Information Technology Security according to standards ISO/IEC 27001 and ISO/IEC 27002. Diploma consists of two parts. In the first part of the diploma a theoretical bases of information security are presented. The second part presents the introduction of ISO/IEC 27001 security standard in the company »X« in wich I performed a practical training. In the closure my diploma work is upgraded with results of my research work and their analysis as well as wit...

  3. Performance tests for instruments measuring radon activity concentration

    International Nuclear Information System (INIS)

    Beck, T.R.; Buchroeder, H.; Schmidt, V.

    2009-01-01

    Performance tests of electronic instruments measuring the activity concentration of 222 Rn have been carried out with respect to the standard IEC 61577-2. In total, 9 types of instrument operating with ionization chambers or electrostatic collection have been tested for the influence of different climatic and radiological factors on the measurement characteristics. It is concluded that all types of instrument, which are commercially available, are suitable for indoor radon measurements. Because of the dependence on climatic conditions, the outdoor use is partly limited.

  4. Effective IEC approaches for Asia. IEC evaluation workshop.

    Science.gov (United States)

    1996-02-01

    The UNFPA-supported project on development and distribution of information, education, and communication (IEC) materials in support of improving women's health and status was evaluated at a workshop held in Tokyo in December 13-15, 1995. The 1992-95 cycle of the project was analyzed by experts from Bangladesh, China, India, Indonesia, Malaysia, Nepal, the Philippines, and Vietnam plus three experts from the UNFPA/Country Support Team. The workshop also made it possible for the experts to identify needs as well as effective utilization of existing IEC materials. It was suggested that a nongovernmental organization be established for the distribution and effective use of these materials. The workshop mostly reviewed the print and audiovisual materials. Videos were also evaluated. The materials were found useful for the targeted region. Among other subregional issues it was noted that youth needs were inadequately addressed as they related to sexually transmitted diseases (STDs), unwanted pregnancy, risk of maternal mortality and morbidity, low birth weight, and premature birth. Although the women of the region comprise one-third of the world's population, 70% of the global annual maternal mortality of 500,000 occurs in the subregion. IEC materials should also target adolescents and their support groups. Other needs were also outlined: the expansion of educational opportunities for women, the promotion of employment, the involvement of men, and the training of personnel. The strategies used in the cycle helped strengthen self-reliance through information and experience sharing. The focus on women should be continued with more attention paid to adolescents and young adults, including males. Women's health issues should be expanded to include menopause, reproductive tract infections, STDs, HIV/AIDS prevention, and legal rights including abortion. The production of IEC materials should be identified through research and analysis of existing materials, focus group

  5. IEC Newsletter, No. 49, Third Quarter 2014

    International Nuclear Information System (INIS)

    2014-12-01

    The IEC Newsletter is prepared by the Incident and Emergency Centre (IEC), Department of Nuclear Safety and Security of the IAEA. The Incident and Emergency Centre (IEC) is the global focal point for emergency preparedness and response for nuclear and radiological safety or security related incidents, emergencies, threats or events of media interest. The IEC is also the world’s centre for coordination of international assistance in emergency. Table of contents: • Spolighting IEC Activities at the 58th IAEA General Conference; • TM on Lessons Learned from Past Emergency Preparedness Review (EPREV) Missions; • Third Full Response Exercise of 2014; • Israel joins RANET; • Launch of Emergency Preparedness Network (EPnet); • IEC Response to Recent Events; Member State Prepaedness; • New Publications Translation; • New USIE Training Video; • The IEC in Numbers

  6. IEC Newsletter, No. 49, Third Quarter 2014

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-12-15

    The IEC Newsletter is prepared by the Incident and Emergency Centre (IEC), Department of Nuclear Safety and Security of the IAEA. The Incident and Emergency Centre (IEC) is the global focal point for emergency preparedness and response for nuclear and radiological safety or security related incidents, emergencies, threats or events of media interest. The IEC is also the world’s centre for coordination of international assistance in emergency. Table of contents: • Spolighting IEC Activities at the 58th IAEA General Conference; • TM on Lessons Learned from Past Emergency Preparedness Review (EPREV) Missions; • Third Full Response Exercise of 2014; • Israel joins RANET; • Launch of Emergency Preparedness Network (EPnet); • IEC Response to Recent Events; Member State Prepaedness; • New Publications Translation; • New USIE Training Video; • The IEC in Numbers.

  7. Special Testing for Modules Deployed in Hot Use Environments - Are We Doing This in a Low-Cost Way?

    Energy Technology Data Exchange (ETDEWEB)

    Repins, Ingrid; Jordan, Dirk; Bosco, Nick; Flueckiger, Chris

    2016-09-12

    The proposed new IEC standard will address the test temperature requirements in IEC 61215 (module design), IEC 61730 (module safety), IEC 62790 (junction box safety) and IEC 62852 (connectors), and will provide guidelines to modify temperature limits in four existing standards to better describe module performance in hotter climates. This workshop includes four presentations: Special Testing for Modules Deployed in Hot Use Environments - Are We Doing This in a Low-Cost Way?, Experimental Evidence, Why the highest temperatures are the most stressful to PV modules during thermal cycling, and Safety Aspects for Modules Deployed in Hot Use Environments.

  8. The first IEC fusion industrial neutron generator and developments

    Science.gov (United States)

    Sved, John

    1999-06-01

    Inertial Electrostatic Confinement fusion grade plasma containment has been sporadically researched since the early 1960's. In the 1990's the work of G. H. Miley and his team at the University of Illinios, Fusion Studies Laboratory, Champaign-Urbana has stimulated a collaboration with industry. The development and test program for the first industrial IEC neutron generator has progressed to the point where an endurance test is under way to demonstrate at least 10,000 hours of operational life of the sealed chamber device without servicing. The market entry goals of steady 107 D-D n/s CW output with an air-cooled system have been achieved. DASA has invested in the development of the industrial product and the continuing basic research at the UI-FSL. The complete DASA FusionStar IEC-PS1 point source neutron generator set is described with emphasis on the interfaces to user NAA systems. The next product developments are pulsed neutron operations and higher fusion reaction rates of up to 1010 by means of affordable add-ons to the basic IEC-PS system. The production engineering experience gained will next be applied to a more challenging line source variant of the IEC. Beyond neutron and proton sources, several other IEC applications are being developed.

  9. Atomic processes in Inertial Electrostatic Confinement (IEC) devices

    International Nuclear Information System (INIS)

    Nebel, R.A.; Turner, L.; Tiouririne, T.N.; Barnes, D.C.; Nystrom, W.D.; Bussard, R.W.; Miley, G.H.; Javedani, J.; Yamamoto, Y.

    1993-01-01

    Inertial Electrostatic Confinement (IEC) is one of the earliest plasma confinement concepts, having first been suggested by P. T. Farnsworth in the 1950s. The concept involves a simple apparatus of concentric spherical electrostatic grids or a combination of grids and magnetic fields. An electrostatic structure is formed from the confluence of electron or ion beams. Gridded IEC systems have demonstrated neutron yields as high as 2*10 10 neutrons/sec. These systems have considerable potential as small, inexpensive, portable neutron sources for assaying applications. Neutron tomography is also a potential application. Atomic physics effects strongly influence the performance of all of these systems. Important atomic effects include elastic scattering, ionization, excitation, and charge exchange. This paper discusses how an IEC system is influenced by these effects and how to design around them. Theoretical modeling and experimental results are presented

  10. Test planning and performance

    International Nuclear Information System (INIS)

    Zola, Maurizio

    2001-01-01

    Testing plan should include Safety guide Q4 - Inspection and testing - A testing plan should be prepared including following information: General information (facility name, item or system reference, procurement document reference, document reference number and status, associated procedures and drawings); A sequential listing of all testing activities; Procedure, work instruction, specification or standard to be followed in respect of each operation and test; Acceptance criteria; Identification of who is performing tests; Identification of hold points; Type of records to be prepared for each test; Persons and organizations having authority for final acceptance. Proposed activities sequence is: visual, electrical and mechanical checks; environmental tests (thermal aging, vibrations aging, radioactive aging); performance evaluation in extreme conditions; dynamic tests with functional checks; final electrical and mechanical checks The planning of the tests should always be performed taking into account an interpretative model: a very tight cooperation is advisable between experimental people and numerical people dealing with the analysis of more or less complex models for the seismic assessment of structures and components. Preparatory phase should include the choice of the following items should be agreed upon with the final user of the tests: Excitation points, Excitation types, Excitation amplitude with respect to frequency, Measuring points. Data acquisition, recording and storage, should take into account the characteristics of the successive data processing: to much data can be cumbersome to be processed, but to few data can make unusable the experimental results. The parameters for time history acquisition should be chosen taking into account data processing: for Shock Response Spectrum calculation some special requirements should be met: frequency bounded signal, high frequency sampling, shock noise. For stationary random-like excitation, the sample length

  11. Basic Characteristics of IEC Flickermeter Processing

    Directory of Open Access Journals (Sweden)

    Jarosław Majchrzak

    2012-01-01

    . This paper presents the results of the numerical simulations that reconstruct the processing of flickermeter in frequency domain. With the use of standard test signals, the characteristics of flickermeter were determined for the case of amplitude modulation of input signal, frequency modulation of input signal, and for input signal with interharmonic component. For the needs of simulative research, elements of standard IEC flickermeter signal chain as well as test signal source and tools for acquisition, archiving, and presentation of the obtained results were modeled. The results were presented with a set of charts, and the specific fragments of the charts were pointed out and commented on. Some examples of the influence of input signal’s bandwidth limitation on the flickermeter measurement result were presented for the case of AM and FM modulation. In addition, the diagrams that enable the evaluation of flickermeter’s linearity were also presented.

  12. System Performance and Testing

    NARCIS (Netherlands)

    Frei, U.; Oversloot, H.

    2004-01-01

    This chapter compares and contrasts the system performance of two widely used solar thermal systems using testing and simulation programs. Solar thermal systems are used in many countries for heating domestically used water. In addition to the simple thermosiphon systems, better designed pumped

  13. Standardization of test conditions for gamma camera performance measurement

    International Nuclear Information System (INIS)

    Jordan, K.

    1980-01-01

    The actual way of measuring gamma camera performance is to use point sources or flood sources in air, often in combination with bar phantoms. This method mostly brings best performance parameters for cameras but it has nothing in common with the use of a camera in clinical practice. Particular in the case of low energy emitters, like Tc-99m, the influence of scattered radiation over the performance of cameras is very high. Therefore it is important to have test conditions of radionuclide imaging devices, that will approach as best as practicable the measuring conditions in clinical applications. It is therefore a good news that the International Electrochemical Commission IEC has prepared a draft 'Characteristics and test conditions of radionuclide imaging devices' which is now submitted to the national committees for formal approval under the Six Months' Rule. Some essential points of this document are discussed in the paper. (orig.) [de

  14. Impact Of IEC Intervention On Knowledge Regarding AIDS Amongst Senior Secondary School Children Of East Delhi

    Directory of Open Access Journals (Sweden)

    Bhasin S. K

    1999-01-01

    Full Text Available Research questions: 1. What is the level of awareness regarding HIV/AIDS amongst school children in East Delhi? 2. What is the impact of IEC intervention on the level of awareness regarding HIV/AIDS in these children? Objective: To find out the impact of IEC intervention on awareness regarding HIV/AIDS amongst senior secondary boys and girls in schools of East Delhi. Study design: Pre and post IEC interventional study. Settings: In four randomly selected senior secondary schools in East Delhi. Participants: 294 boys and 333 girls of class XI and XII in pre IEC group and 239 boys and 203 girls in post IEC group. Intervention: An IEC package of exhibition of posters, videotapes and intra group open discussion. Outcome variables: Proportion (prevalence of school children having correct knowledge of various aspects of HIV/AIDS after IEC intervention. Statistical analysis: Chi-square test. Results: IEC intervention significantly generated an enhancing effect on most aspects of their awareness towards HIV/AIDS among both boys and girls. Conclusions: There is an urgent need to impart health education for dispelling misconceptions regarding this disease.

  15. IEC Newsletter, No. 50, Fourth Quarter, 2014

    International Nuclear Information System (INIS)

    2014-12-01

    The IEC Newsletter is prepared by the Incident and Emergency Centre (IEC), Department of Nuclear Safety and Security of the IAEA. The Incident and Emergency Centre (… IEC) is the global focal point for emergency preparedness and response for nuclear and radiological safety or security related incidents, emergencies, threats or events of media interest. The IEC is also the world’s centre for coordination of international assistance in emergency. The following topics are presented in this newsletter: Three Workshops at the Fukushima RANET Capacity Building Centre; Belgium joins RANET; IEC Response to Recent Events; Recent Exercises; Israel conducts National Response Exercise at Soreq; IACRNE: 24th Regular Meeting; Safety Requirements on Emergency Preparedness and Response; NIRS 2014 Workshop on Radiation Emergency Medicine; Member State Preparedness; New Publications and Translations and Forthcoming Events

  16. IEC Newsletter, No. 51, First Quarter, 2015

    International Nuclear Information System (INIS)

    2015-06-01

    The IEC Newsletter is prepared by the Incident and Emergency Centre (IEC), Department of Nuclear Safety and Security of the IAEA. The Incident and Emergency Centre (IEC) is the global focal point for emergency preparedness and response for nuclear and radiological safety or security related incidents, emergencies, threats or events of media interest. The IEC is also the world’s centre for coordination of international assistance in emergency. The following topics are presented in this newsletter: IEM 8; Internal Full Response Exercise; Board of Governors establishes Safety Requirements in EPR as IAEA Safety Standard; ConvEx-2a; EURDEP Meeting; Train the Trainers Workshop on Medical Aspects of EPR; EPR-Medical 2005 Review Process; EPRIMS; Member State Preparedeness; EPREV Mission to Kenya; RENEB Meeting; Update by Finland of its RANET registration; Recent Events; Upgraded IEC videoconferencing infrastracture; EPREG Meeting and Forthcoming Event: EPR Conference

  17. The performance testing

    International Nuclear Information System (INIS)

    Mayr, A.

    1975-01-01

    Concerning the time-schedule of reactor performance tests they normally begin when suppliers or constructors have finished construction and made all necessary construction and coordinated tests. If the last-mentioned tests are conducted profoundly, they contribute substantially to a quick and simple carrying-out of the last performance tests and to the general quality of components and systems. At this stage all components of a system should be properly fixed, machinery, instruments and electrical components adjusted and calibrated, all set-points tested, electrical and other supply units in operation or ready to operate and all functions pretested. Just at this stage of the work most of the existing defects and failures of systems can be found. Remembering the fact that the difficulty of operation of complex systems results from detail problems, it is extremely useful to remove all things of this kind as soon as possible, at the latest at this time where it is done easily and normally quickly without influencing start-up-procedures of other systems or even of the total plant. (orig./TK) [de

  18. IEC Based D-3He Fusion for Space Propulsion

    International Nuclear Information System (INIS)

    Miley, George H.; Burton, R.; Richardson, N.; Shaban, Y.; Momota, Hiromu

    2002-01-01

    A preliminary system design is presented for a high performance 100-MWe manned space vehicle in the 500 metric ton class, based on Inertial Electrostatic Fusion (IEC), allowing trip times to the outer planets of several months. An IEC is chosen because it's simplified structure results in a very high power-to-weight ratio. D- 3 He fuel is used to give 14.7-MeV protons as a primary fusion reaction product. Direct conversion of proton energy to electricity is employed, providing a high efficiency. An IEC reactor with a proton energy gain (power in 14.7-MeV protons/input electric power) of 4 or better is assumed. Extrapolation of present laboratory scale IEC experiments to such conditions is possible theoretically, but faces several open issues that require further study such as stability under high-density conditions. The final thruster is based on an NSTAR-extrapolated krypton ion design with a specific impulse of 16,000 seconds and a total thrust of 1020 N. Round trip thrust time for mission set to Jupiter ΔV of 100 km/s is then ∼950 days. (authors)

  19. Understanding protocol performance: impact of test performance.

    Science.gov (United States)

    Turner, Robert G

    2013-01-01

    This is the second of two articles that examine the factors that determine protocol performance. The objective of these articles is to provide a general understanding of protocol performance that can be used to estimate performance, establish limits on performance, decide if a protocol is justified, and ultimately select a protocol. The first article was concerned with protocol criterion and test correlation. It demonstrated the advantages and disadvantages of different criterion when all tests had the same performance. It also examined the impact of increasing test correlation on protocol performance and the characteristics of the different criteria. To examine the impact on protocol performance when individual tests in a protocol have different performance. This is evaluated for different criteria and test correlations. The results of the two articles are combined and summarized. A mathematical model is used to calculate protocol performance for different protocol criteria and test correlations when there are small to large variations in the performance of individual tests in the protocol. The performance of the individual tests that make up a protocol has a significant impact on the performance of the protocol. As expected, the better the performance of the individual tests, the better the performance of the protocol. Many of the characteristics of the different criteria are relatively independent of the variation in the performance of the individual tests. However, increasing test variation degrades some criteria advantages and causes a new disadvantage to appear. This negative impact increases as test variation increases and as more tests are added to the protocol. Best protocol performance is obtained when individual tests are uncorrelated and have the same performance. In general, the greater the variation in the performance of tests in the protocol, the more detrimental this variation is to protocol performance. Since this negative impact is increased as

  20. An IEC standard on quality assurance for diagnostic X-ray systems

    International Nuclear Information System (INIS)

    Boer, J.A. den

    1985-01-01

    A presentation is given of some characteristics of the International Electrotechnical Commission (IEC). This is followed by a short discussion of general aspects of quality assurance in the diagnostic department. From this discussion it becomes apparent to which aspects of quality assurance IEC can contribute. Within that framework a working group of Sub-Committee 62 is at present active in developing a standard on quality assurance for diagnostic X-ray systems. The standard will contain a set of constancy tests that is claimed to allow a balanced quality assurance programme. The democratic procedure of IEC should guarantee that the proposed standard gains wide acceptance. (author)

  1. IEC Newsletter, No. 48, Second Quarter 2014

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-09-15

    The Incident and Emergency Centre (IEC) is the global focal point for emergency preparedness and response for nuclear and radiological safety or security related incidents, emergencies, threats or events of media interest. The IEC is also the world’s centre for coordination of international assistance in emergency. Table of contents: • Competent Authorities Meeting; • ConvEx-1b Exercise in May 2014; • ConvEx-2a Exercise in April 2014; • IAEA Participates in First ConvEx-2e Exercise; • Second Full Response Mode Exercise of 2014; • New Interactive Learning Tool on INES; • INES Technical Meeting; • Participation in the RAD 2014 Conference; • Member State Preparedness; • Pilot Workshop for the Optimization of National Radiation Emergency Plans; • IEC Response to Recent Events; • China and Switzerland Join RANET; Japan Registers in New Functional Area; • Workshop on Radiation Monitoring; • New Publication Translation; • New USIE Feature: USIE Connect; • Twitter Milestone; • IEC News; • IEC Launches New Website.

  2. IEC Newsletter, No. 48, Second Quarter 2014

    International Nuclear Information System (INIS)

    2014-09-01

    The Incident and Emergency Centre (IEC) is the global focal point for emergency preparedness and response for nuclear and radiological safety or security related incidents, emergencies, threats or events of media interest. The IEC is also the world’s centre for coordination of international assistance in emergency. Table of contents: • Competent Authorities Meeting; • ConvEx-1b Exercise in May 2014; • ConvEx-2a Exercise in April 2014; • IAEA Participates in First ConvEx-2e Exercise; • Second Full Response Mode Exercise of 2014; • New Interactive Learning Tool on INES; • INES Technical Meeting; • Participation in the RAD 2014 Conference; • Member State Preparedness; • Pilot Workshop for the Optimization of National Radiation Emergency Plans; • IEC Response to Recent Events; • China and Switzerland Join RANET; Japan Registers in New Functional Area; • Workshop on Radiation Monitoring; • New Publication Translation; • New USIE Feature: USIE Connect; • Twitter Milestone; • IEC News; • IEC Launches New Website

  3. Establishment of radiation qualities for radiodiagnostics in LCR/UERJ according to IEC 61267 and TRS 457

    International Nuclear Information System (INIS)

    Silva, D.B. da; Magalhaes, L.A.G.; Estrada, J.J.S.; Pires, E.J.; David, M.G.; Ferreira, N.M.P.D.

    2015-01-01

    The main goal of this work is to establish the radiation qualities of the Laboratório de Ciências Radiológicas (LCR) conventional X-ray equipment for calibrations in radiodiagnostics according to the recommendations of IEC 61267 and TRS 457. Tests were conducted to evaluate the homogeneity of the radiation field, high voltage applied to the X-ray tube, scattering, half-value layers (HVL) and homogeneity coefficients. The results obtained that characterize the radiation field, satisfy the conditions required by TRS 457. Invasive high voltage measures presented results compatible with the requirements of this standard. The HVL measures showed that for the first HVL the tolerance limits of IEC 61267, and the values for the homogeneity coefficients were within the limits established. The quality tests performed in this work were highly satisfactory in meeting the standard requirements. Thus, the main goal was achieved, and the methodology can be used by other similar X-ray systems. - Highlights: • Establishment the radiation qualities for X-ray calibrations in radiodiagnostics. • Comparison to kV between invasive and noninvasive method. • Determination of additional filtrations suggested by IEC 61267. • Determination of the radiation scattered by the experimental setup as TRS 457. • Determination of HVLs as TRS 457.

  4. Power system EMC and IEC publication 1000

    International Nuclear Information System (INIS)

    Teichmann, H.

    1997-01-01

    A classification of the principal phenomena causing electromagnetic disturbances has been prepared by the International Electrotechnical Commission (IEC). Electromagnetic compatibility was defined (by the IEC) as 'the ability of a device, equipment or system to function satisfactorily in its electromagnetic environment without introducing intolerable electromagnetic disturbances in that environment'. The classification includes the following phenomena relative to power systems: (1) low-frequency phenomena, (2) radiated low-frequency phenomena, (2) conducted high-frequency phenomena, (3) radiated high-frequency phenomena, and (4) electrostatic discharge phenomena. The structure of the IEC publication 1000 was explained. Parts 1, 2, 3 and 6 of the publication were highlighted. The issues covered in those parts were: (Part 1) general, (Part 2) environment, (Part 3) limits, and (Part 6) generic standards. 6 refs

  5. Developing IEC strategies for population programmes.

    Science.gov (United States)

    Cohen, S I

    1993-01-01

    The thrust of this article is to define terms of IEC, IEC strategies, the stepwise planning process for IEC, data requirements, the ideational change process, and the need for situational and institutional analysis. A chart provided an at-a-glance perspective on the 11 steps in IEC strategic planning for as many specific target groups as needed. The steps are to state the goals, select and prioritize the target audience, describe the target audience,, determine the IEC activities, outline appropriate messages, identify communication channels, identify managerial and organizational strategies, calculate the amount of resources required, identify a realistic time frame, and evaluate critical factors and obstacles. IEC goals are to contribute to solving a problem or supporting an issue, which involved attitudinal and/or behavioral changes. Many strategies are possible. The common weaknesses are the lack of priorities, the view of targets as a mass audience, a lack in support for population strategies, a lack of integration with family planning or specific population sectors, a lack of integration of up-to-data research findings on population programs, vague or difficult-to-measure objectives, reliance on printed media, and sporadic assessment of personnel needs. THe levels of strategy are identified as follows: 1) national and multisectoral, 2) national and sectoral specific, and 3) project specific. Traditional sociocultural research and KAP surveys are not sufficient to provide an understanding of the target audience. There must be an understanding of the stages of individual change: unaware, aware, concerned, information seeking, learning, motivated to change, initial behavior change, sustained behavior change, and adoption or refusal of behavior change. Beliefs must be distinguished from attitudes in measurement. Changes in beliefs may involve correction of misinformation; attitude change requires a motivational approach. Behavior may be determined by other

  6. China and IEC international standardization activities

    Institute of Scientific and Technical Information of China (English)

    Su Zhongmin; Guo Chenguang

    2006-01-01

    @@ International Electrotechnical Commission (IEC), one of the currently worlswide largest and most authoritative international standardization organizations,is specialized in developing and promulgating international standards for the electric and electronic fields, which are widespread adopted through out the world and play an important role in the international trade of electric and electronic products. Moreover, according to the 2005 statistics by the World Bank, the population of countries participating in the IEC activities accounts for 92% of the world total and their trade volume accounts for 95% of the global total.

  7. IEC 61850. Integrated supervision of auxiliary power equipment; IEC 61850. Prozess und Eigenbedarf wachsen zusammen

    Energy Technology Data Exchange (ETDEWEB)

    Ostertag, Robert; Jung, Matthias [Siemens AG, Erlangen (Germany)

    2009-07-01

    It is state of technology today: Having process control and auxiliary power control integrated in one DCS. The integration is based on the international standard IEC 61850 which allows standardization of electrical structures from the process interface up to the DCS level. Modern control systems are designed to realize a system structure according to IEC 61850. A wide range of systems is available from systems with interfaces to realize a standardized data exchange up to systems with a complete integration of the standard IEC 61850. (orig.)

  8. Development of interim test methods and procedures for determining the performance of small photovoltaic systems

    Energy Technology Data Exchange (ETDEWEB)

    McNutt, P.; Kroposki, B.; Hansen, R.; Algra, K.; DeBlasio, R. [National Renewable Energy Lab., Golden, CO (United States)

    1998-09-01

    The National Renewable Energy Laboratory (NREL) is developing tests and procedures that will determine if the configuration of a small photovoltaic (PV) system is suitable for its intended use, and if the system will perform as specified. An overview of these procedures is presented in this paper. Development of standard test procedures will allow designers, manufacturers, system integrators, users, and independent laboratories to assess the performance of PV systems under outdoor prevailing conditions. An NREL Technical Report detailing the procedures is under way, and the IEEE Standards Coordinating Committee 21 (SCC21) has established a project on this subject. The work will be submitted to the IEEE SCC21 and International Electrotechnical Commission Technical Committee 82 (IEC TC82) for consideration as a consensus standard. Certification bodies such as PowerMark and PV Global Approval Program (PVGAP) may adopt the IEC and IEEE documents when testing systems. Developing standardized test methods and procedures at NREL to evaluate the outdoor performance of PV systems will encourage product quality and promote PV standards development. Standardized tests will assure people that PV systems will perform as specified for their intended applications. As confidence in PV systems increases, the successful commercialization of PV will grow internationally.

  9. TU-G-213-01: IEC and US Committee Activities and Organizational Structure

    Energy Technology Data Exchange (ETDEWEB)

    Ibbott, G. [UT MD Anderson Cancer Center (United States)

    2015-06-15

    The International Electrotechnical Commission (IEC) writes standards that manufacturers of electrical equipment must comply with. Medical electrical equipment, such as medical imaging, radiation therapy, and radiation dosimetry devices, fall under Technical Committee 62. Of particular interest to medical physicists are the standards developed within Subcommittees (SC) 62B, which addresses diagnostic radiological imaging equipment, and 62C, which addresses equipment for radiation therapy, nuclear medicine and dosimetry. For example, a Working Group of SC 62B is responsible for safety and quality assurance standards for CT scanners and a Working Group of SC 62C is responsible for standards that set requirements for dosimetric safety and accuracy of linacs and proton accelerators. IEC standards thus have an impact on every aspect of a medical physicist’s job, including equipment testing, shielding design, room layout, and workflow. Consequently, it is imperative that US medical physicists know about existing standards, as well as have input on those under development or undergoing revision. The structure of the IEC and current standards development work will be described in detail. The presentation will explain how US medical physicists can learn about IEC standards and contribute to their development. Learning Objectives: Learn about the structure of the IEC and the influence that IEC standards have on the design of equipment for radiology and radiation therapy. Learn about the mechanisms by which the US participates in the development and revision of standards. Understand the specific requirements of several standards having direct relevance to diagnostic and radiation therapy physicists.

  10. IEC Newsletter, No. 52/2 (2015)

    International Nuclear Information System (INIS)

    2015-10-01

    The IEC Newsletter is prepared by the Incident and Emergency Centre (IEC), Department of Nuclear Safety and Security of the IAEA. The Incident and Emergency Centre (IEC) is the global focal point for emergency preparedness and response for nuclear and radiological safety or security related incidents, emergencies, threats or events of media interest. The IEC is also the world’s centre for coordination of international assistance in emergency. The following topics are presented in this newsletter: Peer Review of UAE’s Emergency Plans for Barakah NPP; IEM 9: Assessment and Prognosis in Response to a Nuclear or Radiological Emergency; Tabletop exercise simulating marime transport emergency; Establishment of EPR Standards Committee; Annual ConvEx-1c; Advisory Mission to Kuwait on medical aspects of EPR; EPR self-assessment for Arab Member States; Event at Cattenom NPP; Train the Trainers Workshop for first responders in Vienna; Member States Preparedness; Republic of Korea joins RANET — USA registers new capabilities; Workshop on Emergency Radiation Monitoring; #EPR15: International Conference on Global EPR; Recent Events

  11. Effectiveness of Information, Education and Communication (IEC) on ...

    African Journals Online (AJOL)

    IEC) on the public acceptability of unsafe abortion solution options of contraception, family life education including sex education and liberalization of abortion laws. Our aim was to use IEC to improve public acceptability of the recommended ...

  12. Uniform peanut performance test 2017

    Science.gov (United States)

    The Uniform Peanut Performance Tests (UPPT) are designed to evaluate the commercial potential of advanced breeding peanut lines not formally released. The tests are performed in ten locations across the peanut production belt. In this study, 2 controls and 14 entries were evaluated at 8 locations....

  13. Inspection system performance test procedure

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1995-01-01

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system

  14. IEC 61850: integrating substation automation into the power plant control system; IEC 61850: Integration der Schaltanlagenautomatisierung in die Kraftwerksleittechnik

    Energy Technology Data Exchange (ETDEWEB)

    Orth, J. [ABB AG, Mannheim (Germany)

    2008-07-01

    The new communication standard IEC 61850 has been developed in the substation automation domain and was released 2004 as a worldwide standard. Meanwhile IEC 61850 is already established in many substation automation markets. The paper discusses the implementation of IEC 61850 integrating process control and substation automation into one consistent system in a power plant. (orig.)

  15. Progress in IEC 61400-27

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Andresen, Björn; Bech, John

    2012-01-01

    turbines (part 1) and wind power plants (part 2), which are intended for short-term power system stability analyses. WG27 submitted the first CD of Part 1 in December 2012. The CD describes generic wind turbine models and a procedure for validation of wind turbine models. The generic model description......This paper presents the status of the ongoing work in IEC Technical Committee 88 Working Group 27 (TC88 WG27) developing a standard IEC 61400-27 for “Electrical simulation models for wind power generation”. The purpose of this standardization work is to define generic simulation models for wind...... consists of a general model structure intending to cover existing as well as future types of wind turbines, and specific fundamental frequency positive sequence models for the four wind turbine types which are widely used today. The validation procedure can be applied to the generic models specified...

  16. Aggregated wind power plant models consisting of IEC wind turbine models

    DEFF Research Database (Denmark)

    Altin, Müfit; Göksu, Ömer; Hansen, Anca Daniela

    2015-01-01

    The common practice regarding the modelling of large generation components has been to make use of models representing the performance of the individual components with a required level of accuracy and details. Owing to the rapid increase of wind power plants comprising large number of wind...... turbines, parameters and models to represent each individual wind turbine in detail makes it necessary to develop aggregated wind power plant models considering the simulation time for power system stability studies. In this paper, aggregated wind power plant models consisting of the IEC 61400-27 variable...... speed wind turbine models (type 3 and type 4) with a power plant controller is presented. The performance of the detailed benchmark wind power plant model and the aggregated model are compared by means of simulations for the specified test cases. Consequently, the results are summarized and discussed...

  17. Compressible Fluid Suspension Performance Testing

    National Research Council Canada - National Science Library

    Hoogterp, Francis

    2003-01-01

    ... compressible fluid suspension system that was designed and installed on the vehicle by DTI. The purpose of the tests was to evaluate the possible performance benefits of the compressible fluid suspension system...

  18. Where Lab Tests Are Performed

    Science.gov (United States)

    ... example, there may be sections that focus on microbiology, hematology, chemistry, and blood banking . Other units may perform highly specialized tests using electron microscopy and immunohistochemistry, and still others ...

  19. Analysis of ISO/IEC 17025 for establishment of KOLAS (Korea Laboratory Accreditation Scheme) quality assurance system

    International Nuclear Information System (INIS)

    Nam, Ji Hee

    2000-12-01

    Besides one existent accredited lab, radioactive material chemical analysis lab, five test laboratories and two calibration labs are under plan to acquire the accreditation from KOLAS. But the current Quality Manual was developed according to ISO Guide 25 that was superceded by ISO/IEC 17025. Since it is tailored to the radioactive material chemical analysis lab, a number of requirements of the Manual are not applicable to the labs other than radioactive material chemical analysis lab. Through the analysis of ISO/IEC 17025, a model of quality system was established which is not only consistent with ISO/IEC 17025 but reflective of the KAERI's situation

  20. Implementation of IEC Generic Models of Type 1 Wind Turbine Generator in DIgSILENT PowerFactory

    Institute of Scientific and Technical Information of China (English)

    Haoran ZHAO; Qiuwei WU; Ioannis MARGARIS; Poul S(O)RENSEN

    2013-01-01

    The implementation method for the International Electrotechnical Commission (IEC) generic models of Type 1 wind turbine generator (WTG) in DIgSILENT PowerFactory is presented.The following items are described,i.e.model structure,model blocks and how to implement these blocks in the PowerFactory environment.Case studies under both normal and fault conditions are done with the implemented IEC generic models of Type 1 WTG,and dynamic responses are captured and analyzed.The case study results show that the IEC generic models of Type 1 WTG can correctly represent the performances of Type 1 WTG under both normal and fault conditions.

  1. Performance testing With JMeter 29

    CERN Document Server

    Erinle, Bayo

    2013-01-01

    Performance Testing With JMeter 2.9 is a standard tutorial that will help you polish your fundamentals, guide you through various advanced topics, and along the process help you learn new tools and skills.This book is for developers, quality assurance engineers, testers, and test managers new to Apache JMeter, or those who are looking to get a good grounding in how to effectively use and become proficient with it. No prior testing experience is required.

  2. Qualification of a Human-System Interface to Meet IEC 61513

    International Nuclear Information System (INIS)

    Malcom, Scott; Kim, Sun Ho; Macdonald, Marienna

    2011-01-01

    challenging. The ACCIS team has relied on the services of an external certified functional safety expert to provide assistance on interpreting the IEC standards and assisting with the safety analyses that is required in support of compliance arguments. In particular, the expert provided leadership and guidance when performing the Failure Modes and Effects Analysis (FMEA), Failure Modes, Effects and Diagnostics Analysis (FMEDA), and software Hazards and Operability Analysis (HAZOP) and has helped to prepare arguments that demonstrate compliance to each IEC requirement. The external certified functional safety expert performed a preliminary assessment to determine the feasibility of qualifying ACCIS, followed later by a detailed assessment to identify the compliance gaps requiring remedial action. Both audits confirmed that achieving IEC compliance is well within the capabilities of the ACCIS product. Work to close identified gaps ensued. A full qualification cycle was completed and will support qualification activities at the application level

  3. Implementation and Practical Benefits of ISO/IEC 17025:2005 in a ...

    African Journals Online (AJOL)

    User

    support of top management. ... quality management system, based on ISO/IEC 17025:2005, is achievable if there ... services of an accredited laboratory knowing that their decisions will be .... reports containing test results of the methods included in the Accreditation ..... As XYZ Laboratory is a water and wastewater testing.

  4. Scaling of the Inertial Electrostatic Confinement (IEC) for near-term thrusters and future fusion propulsion

    International Nuclear Information System (INIS)

    Miley, G.; Bromley, B.; Jurczyk, B.; Stubbers, R.; DeMora, J.; Chacon, L.; Gu, Y.

    1998-01-01

    Inertial Electrostatic Confinement (IEC) is a unique approach to fusion and plasma energy systems that was conceptualized in the 1960s (Hirsch 1967) and has been the focus of recent development in the 1990s (Miley et al. 1995a). In the interests of space power and propulsion systems, conceptual rocket design studies (Bussard and Jameson 1994, Miley et al. 1995b) using the IEC have predicted excellent performance for a variety of space missions, since the power unit avoids the use of magnets and heavy drives resulting in a very high, specific impulse compared to other fusion systems. In their recent survey of prior conceptual design studies of fusion rockets, Williams and Borowski (1997) found that the Bussard IEC conceptual study (the open-quotes QEDclose quotes engine) offered a thrust-to-weight ratio of 10 milli-g close-quote s, a factor of five higher than conventional magnetic confinement concepts and even slightly above anti-proton micro fission/fusion designs. Thus there is considerable motivation to study IEC concepts for eventual space applications. However, the physics feasibility of the IEC still requires experimental demonstration, and an expanded data base is needed to insure that a power unit can in fact be built. copyright 1998 American Institute of Physics

  5. Scaling of the Inertial Electrostatic Confinement (IEC) for near-term thrusters and future fusion propulsion

    International Nuclear Information System (INIS)

    Miley, G.; Bromley, B.; Jurczyk, B.; Stubbers, R.; DeMora, J.; Chacon, L.; Gu, Y.

    1998-01-01

    Inertial Electrostatic Confinement (IEC) is a unique approach to fusion and plasma energy systems that was conceptualized in the 1960s (Hirsch 1967) and has been the focus of recent development in the 1990s (Miley et al. 1995a). In the interests of space power and propulsion systems, conceptual rocket design studies (Bussard and Jameson 1994, Miley et al. 1995b) using the IEC have predicted excellent performance for a variety of space missions, since the power unit avoids the use of magnets and heavy drives resulting in a very high, specific impulse compared to other fusion systems. In their recent survey of prior conceptual design studies of fusion rockets, Williams and Borowski (1997) found that the Bussard IEC conceptual study (the ''QED'' engine) offered a thrust-to-weight ratio of 10 milli-g's, a factor of five higher than conventional magnetic confinement concepts and even slightly above anti-proton micro fission/fusion designs. Thus there is considerable motivation to study IEC concepts for eventual space applications. However, the physics feasibility of the IEC still requires experimental demonstration, and an expanded data base is needed to insure that a power unit can in fact be built

  6. Approaches to the ISO/IEC 17025 accreditation for Pu and U accountancy analysis

    International Nuclear Information System (INIS)

    Okazaki, Hiro; Sumi, Mika; Abe, Katsuo; Sato, Mitsuhiro; Kageyama, Tomio

    2013-01-01

    The quality control section of Plutonium Fuel Development Center (PFDC) of Japan Atomic Energy Agency has been analyzing isotopic compositions by Mass Spectrometry as well as content by Isotope Dilution Mass Spectrometry (IDMS) of plutonium and uranium in nuclear materials. Along with establishing and managing the quality assurance system, ensuring the reliability of the analysis data is important. PFDC has been establishing the quality management system with ISO9001. ISO9001 consists of management requirements for quality system of organizations. While ISO/IEC 17025 consists of technical requirements for the competence of testing and calibration laboratories in addition to the management requirements. The quality control section addressed technical improvement to improve further reliability of analysis quality and we have accredited for ISO/IEC 17025 of isotopic compositions and content of plutonium and uranium in nuclear materials in March 2010. In this presentation, we report our approaches to the ISO/IEC 17025 accreditation and operation status. (author)

  7. Performance Testing of Cutting Fluids

    DEFF Research Database (Denmark)

    Belluco, Walter

    The importance of cutting fluid performance testing has increased with documentation requirements of new cutting fluid formulations based on more sustainable products, as well as cutting with minimum quantity of lubrication and dry cutting. Two sub-problems have to be solved: i) which machining...... tests feature repeatability, reproducibility and sensitivity to cutting fluids, and ii) to what extent results of one test ensure relevance to a wider set of machining situations. The present work is aimed at assessing the range of validity of the different testing methods, investigating correlation...... within the whole range of operations, materials, cutting fluids, operating conditions, etc. Cutting fluid performance was evaluated in turning, drilling, reaming and tapping, and with respect to tool life, cutting forces, chip formation and product quality (dimensional accuracy and surface integrity...

  8. LFK, FORTRAN Application Performance Test

    International Nuclear Information System (INIS)

    McMahon, F.H.

    1991-01-01

    1 - Description of program or function: LFK, the Livermore FORTRAN Kernels, is a computer performance test that measures a realistic floating-point performance range for FORTRAN applications. Informally known as the Livermore Loops test, the LFK test may be used as a computer performance test, as a test of compiler accuracy (via checksums) and efficiency, or as a hardware endurance test. The LFK test, which focuses on FORTRAN as used in computational physics, measures the joint performance of the computer CPU, the compiler, and the computational structures in units of Mega-flops/sec or Mflops. A C language version of subroutine KERNEL is also included which executes 24 samples of C numerical computation. The 24 kernels are a hydrodynamics code fragment, a fragment from an incomplete Cholesky conjugate gradient code, the standard inner product function of linear algebra, a fragment from a banded linear equations routine, a segment of a tridiagonal elimination routine, an example of a general linear recurrence equation, an equation of state fragment, part of an alternating direction implicit integration code, an integrate predictor code, a difference predictor code, a first sum, a first difference, a fragment from a two-dimensional particle-in-cell code, a part of a one-dimensional particle-in-cell code, an example of how casually FORTRAN can be written, a Monte Carlo search loop, an example of an implicit conditional computation, a fragment of a two-dimensional explicit hydrodynamics code, a general linear recurrence equation, part of a discrete ordinates transport program, a simple matrix calculation, a segment of a Planck distribution procedure, a two-dimensional implicit hydrodynamics fragment, and determination of the location of the first minimum in an array. 2 - Method of solution: CPU performance rates depend strongly on the maturity of FORTRAN compiler machine code optimization. The LFK test-bed executes the set of 24 kernels three times, resetting the DO

  9. Radioactive material packaging performance testing

    International Nuclear Information System (INIS)

    Romano, T.; Cruse, J.M.

    1991-02-01

    To provide uniform packaging of hazardous materials on an international level, the United Nations has developed packaging recommendations that have been implemented worldwide. The United Nations packaging recommendations are performance oriented, allowing for a wide variety of package materials and systems. As a result of this international standard, efforts in the United States are being directed toward use of performance-oriented packaging and elimination of specification (designed) packaging. This presentation will focus on trends, design evaluation, and performance testing of radioactive material packaging. The impacts of US Department of Transportation Dockets HM-181 and HM-169A on specification and low-specific activity radioactive material packaging requirements are briefly discussed. The US Department of Energy's program for evaluating radioactive material packings per US Department of Transportation Specification 7A Type A requirements, is used as the basis for discussing low-activity packaging performance test requirements. High-activity package testing requirements are presented with examples of testing performed at the Hanford Site that is operated by Westinghouse Hanford Company for the US Department of Energy. 5 refs., 2 tabs

  10. IEC ready for turnaround in nuclear industry

    International Nuclear Information System (INIS)

    Schomberg, R.; Corte, E.; Thompson, I.

    2005-01-01

    The activity of IEC Technical Committee (TC) 45 (Nuclear Instrumentation) in conditions of turnaround in nuclear industry is considered. TC 45's main task is to lay down a comprehensive strategy for itself and its two subcommittees as well as to improve the relevance of the nuclear safety standards. Subcommittee 45A develops standards that apply to the electronic and electrical functions and associated systems and equipment used in the instrumentation and control systems of nuclear energy generation facilities. Subcommittee 45B develops and issues standards covering all aspects of instrumentation associated with radiation protection including radiation detectors, radiation monitoring, dosimetry and radiology [ru

  11. GEM: Performance and aging tests

    International Nuclear Information System (INIS)

    Cho, H.S.; Kadyk, J.; Han, S.H.; Hong, W.S.; Perez-Mendez, V.; Wenzel, W.; Pitts, K.; Martin, M.D.; Hutchins, J.B.

    1999-01-01

    Performance and aging tests have been done to characterize Gas Electron Multipliers (GEMs), including further design improvements such as a thicker GEM and a closed GEM. Since the effective GEM gain is typically smaller than the absolute GEM gain, due to trapping of avalanche electrons at the bottom GEM electrode, the authors performed field simulations and measurements for better understanding, and discuss methods to eliminate this effect. Other performance parameters of the GEMs are also presented, including absolute GEM gain, short-term and long-term gain stabilities

  12. Test Driven Development: Performing Art

    Science.gov (United States)

    Bache, Emily

    The art of Test Driven Development (TDD) is a skill that needs to be learnt, and which needs time and practice to master. In this workshop a select number of conference participants with considerable skill and experience are invited to perform code katas [1]. The aim is for them to demonstrate excellence and the use of Test Driven Development, and result in some high quality code. This would be for the benefit of the many programmers attending the conference, who could come along and witness high quality code being written using TDD, and get a chance to ask questions and provide feedback.

  13. Performance standard for dose Calibrator

    CERN Document Server

    Darmawati, S

    2002-01-01

    Dose calibrator is an instrument used in hospitals to determine the activity of radionuclide for nuclear medicine purposes. International Electrotechnical Commission (IEC) has published IEC 1303:1994 standard that can be used as guidance to test the performance of the instrument. This paper briefly describes content of the document,as well as explains the assessment that had been carried out to test the instrument accuracy in Indonesia through intercomparison measurement.Its is suggested that hospitals acquire a medical physicist to perform the test for its dose calibrator. The need for performance standard in the form of Indonesia Standard is also touched.

  14. European wind turbine testing procedure developments. Task 1: Measurement method to verify wind turbine performance characteristics

    DEFF Research Database (Denmark)

    Hunter, R.; Friis Pedersen, Troels; Dunbabin, P.

    2001-01-01

    There is currently significant standardisation work ongoing in the context of wind farm energy yield warranty assessment and wind turbine power performance testing. A standards maintenance team is revising the current IEC (EN) 61400-12 Ed 1 standard forwind turbine power performance testing....... The standard is being divided into four documents. Two of them are drafted for evaluation and verification of complete wind farms and of individual wind turbines within wind farms. This document, and the project itdescribes, has been designed to help provide a solid technical foundation for this revised...... standard. The work was wide ranging and addressed 'grey' areas of knowledge, regarding existing methodologies or to carry out basic research in support offundamentally new procedures. The work has given rise to recommendations in all areas of the work, including site calibration procedures, nacelle...

  15. European wind turbine testing procedure developments. Task 1: Measurement method to verify wind turbine performance characteristics

    Energy Technology Data Exchange (ETDEWEB)

    Hunter, R.; Friis Pedersen, T.; Dunbabin, P.; Antoniou, I.; Frandsen, S.; Klug, H.; Albers, A.; Lee, W.K.

    2001-01-01

    There is currently significant standardisation work ongoing in the context of wind farm energy yield warranty assessment and wind turbine power performance testing. A standards maintenance team is revising the current IEC (EN) 61400-12 Ed 1 standard for wind turbine power performance testing. The standard is being divided into four documents. Two of them are drafted for evaluation and verification of complete wind farms and of individual wind turbines within wind farms. This document, and the project it describes, has been designed to help provide a solid technical foundation for this revised standard. The work was wide ranging and addressed 'grey' areas of knowledge, regarding existing methodologies or to carry out basic research in support of fundamentally new procedures. The work has given rise to recommendations in all areas of the work, including site calibration procedures, nacelle anemometry, multi-variate regression analysis and density normalisation. (au)

  16. TU-G-213-02: IEC Subcommittee 62B (Diagnostic Imaging Equipment): Recent and Active Projects

    International Nuclear Information System (INIS)

    Supanich, M.

    2015-01-01

    The International Electrotechnical Commission (IEC) writes standards that manufacturers of electrical equipment must comply with. Medical electrical equipment, such as medical imaging, radiation therapy, and radiation dosimetry devices, fall under Technical Committee 62. Of particular interest to medical physicists are the standards developed within Subcommittees (SC) 62B, which addresses diagnostic radiological imaging equipment, and 62C, which addresses equipment for radiation therapy, nuclear medicine and dosimetry. For example, a Working Group of SC 62B is responsible for safety and quality assurance standards for CT scanners and a Working Group of SC 62C is responsible for standards that set requirements for dosimetric safety and accuracy of linacs and proton accelerators. IEC standards thus have an impact on every aspect of a medical physicist’s job, including equipment testing, shielding design, room layout, and workflow. Consequently, it is imperative that US medical physicists know about existing standards, as well as have input on those under development or undergoing revision. The structure of the IEC and current standards development work will be described in detail. The presentation will explain how US medical physicists can learn about IEC standards and contribute to their development. Learning Objectives: Learn about the structure of the IEC and the influence that IEC standards have on the design of equipment for radiology and radiation therapy. Learn about the mechanisms by which the US participates in the development and revision of standards. Understand the specific requirements of several standards having direct relevance to diagnostic and radiation therapy physicists

  17. TU-G-213-02: IEC Subcommittee 62B (Diagnostic Imaging Equipment): Recent and Active Projects

    Energy Technology Data Exchange (ETDEWEB)

    Supanich, M. [Rush University Medical Center (United States)

    2015-06-15

    The International Electrotechnical Commission (IEC) writes standards that manufacturers of electrical equipment must comply with. Medical electrical equipment, such as medical imaging, radiation therapy, and radiation dosimetry devices, fall under Technical Committee 62. Of particular interest to medical physicists are the standards developed within Subcommittees (SC) 62B, which addresses diagnostic radiological imaging equipment, and 62C, which addresses equipment for radiation therapy, nuclear medicine and dosimetry. For example, a Working Group of SC 62B is responsible for safety and quality assurance standards for CT scanners and a Working Group of SC 62C is responsible for standards that set requirements for dosimetric safety and accuracy of linacs and proton accelerators. IEC standards thus have an impact on every aspect of a medical physicist’s job, including equipment testing, shielding design, room layout, and workflow. Consequently, it is imperative that US medical physicists know about existing standards, as well as have input on those under development or undergoing revision. The structure of the IEC and current standards development work will be described in detail. The presentation will explain how US medical physicists can learn about IEC standards and contribute to their development. Learning Objectives: Learn about the structure of the IEC and the influence that IEC standards have on the design of equipment for radiology and radiation therapy. Learn about the mechanisms by which the US participates in the development and revision of standards. Understand the specific requirements of several standards having direct relevance to diagnostic and radiation therapy physicists.

  18. TU-G-213-00: The International Electrotechnical Commission (IEC): What Is It and Why Should Medical Physicists Care?

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-06-15

    The International Electrotechnical Commission (IEC) writes standards that manufacturers of electrical equipment must comply with. Medical electrical equipment, such as medical imaging, radiation therapy, and radiation dosimetry devices, fall under Technical Committee 62. Of particular interest to medical physicists are the standards developed within Subcommittees (SC) 62B, which addresses diagnostic radiological imaging equipment, and 62C, which addresses equipment for radiation therapy, nuclear medicine and dosimetry. For example, a Working Group of SC 62B is responsible for safety and quality assurance standards for CT scanners and a Working Group of SC 62C is responsible for standards that set requirements for dosimetric safety and accuracy of linacs and proton accelerators. IEC standards thus have an impact on every aspect of a medical physicist’s job, including equipment testing, shielding design, room layout, and workflow. Consequently, it is imperative that US medical physicists know about existing standards, as well as have input on those under development or undergoing revision. The structure of the IEC and current standards development work will be described in detail. The presentation will explain how US medical physicists can learn about IEC standards and contribute to their development. Learning Objectives: Learn about the structure of the IEC and the influence that IEC standards have on the design of equipment for radiology and radiation therapy. Learn about the mechanisms by which the US participates in the development and revision of standards. Understand the specific requirements of several standards having direct relevance to diagnostic and radiation therapy physicists.

  19. Nuclear Knowledge Capture and IEC Standards

    International Nuclear Information System (INIS)

    Sheldon, J.

    2016-01-01

    Full text: An International Standard is a document, established by consensus and approved by a recognized body that provides, for common and repeated use, rules, guidelines or characteristics for activities or their results, aimed at the achievement of the optimum degree of order in a given context. As such, it is a mechanism for sharing knowledge in a particular field. The consensus process used to approve the content of standards ensures that the content is essentially peer-reviewed. This presentation will explain how International Standards are developed and used and their importance in the dissemination of scientific and engineering information. It will also explain the role of the IEC in ensuring that the process for developing standards meets the core principles of the Code of Good Practice of the WTO TBT agreement: transparency, openness, impartiality and consensus, effectiveness and relevance, coherence, and addressing the concerns of developing countries. (author

  20. Radioactive material packaging performance testing

    International Nuclear Information System (INIS)

    Romano, T.

    1992-06-01

    In an effort to provide uniform packaging of hazardous material on an international level, recommendations for the transport of dangerous goods have been developed by the United Nations. These recommendations are performance oriented and contrast with a large number of packaging specifications in the US Department of Transportation's hazard materials regulations. This dual system presents problems when international shipments enter the US Department of Transportation's system. Faced with the question of continuing a dual system or aligning with the international system, the Research and Special Programs Administration of the US Department of Transportation responded with Docket HM-181. This began the transition toward the international transportation system. Following close behind is Docket HM-169A, which addressed low specific activity radioactive material packaging. This paper will discuss the differences between performance-oriented and specification packaging, the transition toward performance-oriented packaging by the US Department of Transportation, and performance-oriented testing of radioactive material packaging by Westinghouse Hanford Company. Dockets HM-181 and HM-169A will be discussed along with Type A (low activity) and Type B (high activity) radioactive material packaging evaluations

  1. General criteria for validation of dosimetry methods in the context of a quality system ISO / IEC 17025; Criterios generales sobre validacion de metodos de dosimetria en el marco de un sistema de calidad ISO/IEC 17025

    Energy Technology Data Exchange (ETDEWEB)

    Martin Garcia, R.; Navarro Bravo, T.

    2011-07-01

    The accreditation of a testing laboratory in accordance with ISO / IEC 17025 recognizes the technical competence of a laboratory to perform certain tests. One of the requirements of that rule states that laboratories must demonstrate that the methods used are valid and appropriate for the intended use and customer needs. This demonstration is accomplished through the process of validation of methods, defined in the rule it self as {sup c}onfirmation by examination and provision of objective evidence that the requirements for a particular purpose{sup .} The process of validating a test method should be well planned and documented, including the requirements under the applicable rules and criteria established by the laboratory to comply with these requirements.

  2. Test Performance Related Dysfunctional Beliefs

    Directory of Open Access Journals (Sweden)

    Recep TÜTÜNCÜ

    2012-11-01

    Full Text Available Objective: Examinations by using tests are very frequently used in educational settings and successful studying before the examinations is a complex matter to deal with. In order to understand the determinants of success in exams better, we need to take into account not only emotional and motivational, but also cognitive aspects of the participants such as dysfunctional beliefs. Our aim is to present the relationship between candidates’ characteristics and distorted beliefs/schemata just before an examination. Method: The subjects of the study were 30 female and 30 male physicians who were about to take the medical specialization exam (MSE in Turkey. Dysfunctional Attitude Scale (DAS and Young Schema Questionnaire Short Form (YSQ-SF were applied to the subjects. The statistical analysis was done using the F test, Mann-Whitney, Kruskal-Wallis, chi-square test and spearman’s correlation test. Results: It was shown that some of the DAS and YSQ-SF scores were significantly higher in female gender, in the group who could not pass the exam, who had repetitive examinations, who had their first try taking an examination and who were unemployed at the time of the examination. Conclusion: Our findings indicate that candidates seeking help before MSE examination could be referred for cognitive therapy or counseling even they do not have any psychiatric diagnosis due to clinically significant cognitive distortion. Measurement and treatment of cognitive distortions that have negative impact on MSE performance may improve the cost-effectiveness and mental well being of the young doctors.

  3. Validation of powder X-ray diffraction following EN ISO/IEC 17025.

    Science.gov (United States)

    Eckardt, Regina; Krupicka, Erik; Hofmeister, Wolfgang

    2012-05-01

    Powder X-ray diffraction (PXRD) is used widely in forensic science laboratories with the main focus of qualitative phase identification. Little is found in literature referring to the topic of validation of PXRD in the field of forensic sciences. According to EN ISO/IEC 17025, the method has to be tested for several parameters. Trueness, specificity, and selectivity of PXRD were tested using certified reference materials or a combination thereof. All three tested parameters showed the secure performance of the method. Sample preparation errors were simulated to evaluate the robustness of the method. These errors were either easily detected by the operator or nonsignificant for phase identification. In case of the detection limit, a statistical evaluation of the signal-to-noise ratio showed that a peak criterion of three sigma is inadequate and recommendations for a more realistic peak criterion are given. Finally, the results of an international proficiency test showed the secure performance of PXRD. © 2012 American Academy of Forensic Sciences.

  4. General criteria for validation of dosimetry methods in the context of a quality system ISO / IEC 17025

    International Nuclear Information System (INIS)

    Martin Garcia, R.; Navarro Bravo, T.

    2011-01-01

    The accreditation of a testing laboratory in accordance with ISO / IEC 17025 recognizes the technical competence of a laboratory to perform certain tests. One of the requirements of that rule states that laboratories must demonstrate that the methods used are valid and appropriate for the intended use and customer needs. This demonstration is accomplished through the process of validation of methods, defined in the rule it self as c onfirmation by examination and provision of objective evidence that the requirements for a particular purpose . The process of validating a test method should be well planned and documented, including the requirements under the applicable rules and criteria established by the laboratory to comply with these requirements.

  5. 40 CFR 60.8 - Performance tests.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Performance tests. 60.8 Section 60.8... PERFORMANCE FOR NEW STATIONARY SOURCES General Provisions § 60.8 Performance tests. (a) Except as specified in... conduct performance test(s) and furnish the Administrator a written report of the results of such...

  6. Electron emitter pulsed-type cylindrical IEC

    International Nuclear Information System (INIS)

    Miley, G.H.; Gu, Y.; Stubbers, R.; Zich, R.; Anderl, R.; Hartwell, J.

    1997-01-01

    A cylindrical version of the single grid Inertial Electrostatic Confinement (IEC) device (termed the C-device) has been developed for use as a 2.5-MeV D-D fusion neutron source for neutron activation analysis. The C-device employs a hollow-tube type cathode with similar anodes backed up by ''reflector'' dishes. The resulting discharge differs from a conventional hollow cathode discharge, by creating an explicit ion beam which is ''pinched'' in the cathode region. Resulting fusion reactions generate ∼10 6 neutron/s. A pulsed version is under development for applications requiring higher fluxes. Several pulsing techniques are under study, including an electron emitter (e-emitter) assisted discharge in a thorated tungsten wire emitter located behind a slotted area in the reflector dishes. Pulsing is initiated after establishing a low power steady-state discharge by pulsing the e-emitter current using a capacitor switch type circuit. The resulting electron jet, coupled with the discharge by the biased slot array, creates a strong pulse in the pinched ion beam. The pulse length/repetition rate are controlled by the e-emitter pulse circuit. Typical parameters in present studies are ∼30micros, 10Hz and 1-amp ion current. Corresponding neutron measurements are an In-foil type activation counter for time averaged rates. Results for a wide variety of operating conditions are presented

  7. Evaluation of a LiF:Mg,Ti thermoluminescent ring dosimeter according to the IEC 62387:2012 standards

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Edyelle L.B.; Barros, Vinícius S.M. de; Asfora, Viviane K.; Khoury, Helen J., E-mail: vsmdbarros@gmail.com [Unversidade Federal de Pernambuco (UFPE), Recife, PE (Brazil). Departamento de Energia Nuclear

    2017-07-01

    This work shows results of type testing of a ring dosimeter system under new IEC 62387:2012. The personal dosimeter investigated in this work consists of a commercial one element plastic ring (RADOS) which contains an LiF:Mg,Ti. By applying requirements for statistical fluctuations and linearity, a minimum measurable dose in Hp(0.07) was established. Energy and angular dependence aided in determining energy correction factors and fading requirements were used to select the most appropriate preheat scheme. Type testing of passive radiation monitors performed in the Radiation Metrology Laboratory (LMRI-DEN/UFPE) of the Federal University of Pernambuco is a major step in Brazil for the independent evaluation of these dosimeters, currently not available in the country. (author)

  8. ITIL and ISO/IEC 20000 a practical handbook

    CERN Document Server

    Hernandez, Alex

    2012-01-01

    The purpose of this publication is to provide your organization with a pragmatic approach to effectively implementing service management, incorporating practices from the ITIL framework and the ISO/IEC 20000 standard.

  9. The performance test of anti-scattering x-ray grid with inclined shielding material by MCNP code simulation

    Energy Technology Data Exchange (ETDEWEB)

    Bae, Jun Woo; Kim, Hee Reyoung [Ulsan National Institute of Science and Technology, Ulsan (Korea, Republic of)

    2016-06-15

    The scattered photons cause reduction of the contrast of radiographic image and it results in the degradation of the quality of the image. In order to acquire better quality image, an anti-scattering x-ray gird should be equipped in radiography system. The X-ray anti-scattering grid of the inclined type based on the hybrid concept for that of parallel and focused type was tested by MCNP code. The MCNPX 2.7.0 was used for the simulation based test. The geometry for the test was based on the IEC 60627 which was an international standard for diagnostic X-ray imaging equipment-Characteristics of general purpose and mammographic anti-scatter grids. The performance of grids with four inclined shielding material types was compared with that of the parallel type. The grid with completely tapered type the best performance where there were little performance difference according to the degree of inclination.

  10. Stereotype Threat, Test Anxiety, and Mathematics Performance

    Science.gov (United States)

    Tempel, Tobias; Neumann, Roland

    2014-01-01

    We investigated the combined effects of stereotype threat and trait test anxiety on mathematics test performance. Stereotype threat and test anxiety interacted with each other in affecting performance. Trait test anxiety predicted performance only in a diagnostic condition that prevented stereotype threat by stereotype denial. A state measure of…

  11. IEC Newsletter, No. 47, First Quarter 2014

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-05-15

    The ConvEx-3 (2013) evaluation meeting - the Fifth Meeting of the Inter-Agency Committee on Radiological and Nuclear Emergencies Working Group on Coordinated International Exercises (IACRNE-WG-CIE) - took place at IAEA Headquarters in Vienna from 11-12 February 2014. Representatives from the Moroccan authorities, members of the IACRNE Working Group on Coordinated International Exercises, exercise chief evaluators, and the chairperson of the National Competent Authority Coordination Group (NCACG) were invited and participated in the meeting. The objectives of the meeting were to evaluate the ConvEx-3 (2013) exercise, to review the draft Exercise Report, and to discuss exercise findings and conclusions. On the first day of the meeting (11 February), the exercise was evaluated by the host country Morocco and by chief evaluators of some international organizations and Member States. National objectives, findings, conclusions and recommendations for emergency preparedness and response improvements were presented and discussed. On the second day (12 February), the Lead Exercise Evaluator and chair of the ICARNE WG-CIE, presented the draft Exercise Report, and proposals for common findings, conclusions and recommendations based on the Chief Evaluator's reports were consolidated. It was also agreed that the revised draft Exercise Report will be distributed for comment and feedback to all chief evaluators who have submitted evaluation reports to the IAEA. The ConvEx-3 exercise was conducted by the Incident and Emergency Centre (IEC) on 20-21 November 2013. Fifty-nine Member States (including Morocco) and ten international organizations (including the IAEA) participated in the exercise.

  12. IEC Newsletter, No. 47, First Quarter 2014

    International Nuclear Information System (INIS)

    2014-05-01

    The ConvEx-3 (2013) evaluation meeting - the Fifth Meeting of the Inter-Agency Committee on Radiological and Nuclear Emergencies Working Group on Coordinated International Exercises (IACRNE-WG-CIE) - took place at IAEA Headquarters in Vienna from 11-12 February 2014. Representatives from the Moroccan authorities, members of the IACRNE Working Group on Coordinated International Exercises, exercise chief evaluators, and the chairperson of the National Competent Authority Coordination Group (NCACG) were invited and participated in the meeting. The objectives of the meeting were to evaluate the ConvEx-3 (2013) exercise, to review the draft Exercise Report, and to discuss exercise findings and conclusions. On the first day of the meeting (11 February), the exercise was evaluated by the host country Morocco and by chief evaluators of some international organizations and Member States. National objectives, findings, conclusions and recommendations for emergency preparedness and response improvements were presented and discussed. On the second day (12 February), the Lead Exercise Evaluator and chair of the ICARNE WG-CIE, presented the draft Exercise Report, and proposals for common findings, conclusions and recommendations based on the Chief Evaluator's reports were consolidated. It was also agreed that the revised draft Exercise Report will be distributed for comment and feedback to all chief evaluators who have submitted evaluation reports to the IAEA. The ConvEx-3 exercise was conducted by the Incident and Emergency Centre (IEC) on 20-21 November 2013. Fifty-nine Member States (including Morocco) and ten international organizations (including the IAEA) participated in the exercise

  13. Information security for energy automation. IEC 62351 Challenges and possible solutions; Informationsicherheit fuer die Energieautomatisierung. IEC 62351 - Herausforderungen und Loesungsansaetze

    Energy Technology Data Exchange (ETDEWEB)

    Knorr, K.; Fries, S. [Sector Corporate Technology, Siemens AG, Muenchen (Germany); Seewald, M.G. [Sector Energy, Siemens AG, Nuernberg (Germany)

    2008-10-06

    Information security has gained tremendous importance for energy automation systems over the last years. New standards like IEC 62351 address this topic and specify technical requirements which have to be met by the vendors. Especially vendors that cover the entire energy automation chain with their product portfolio have to face several new demanding challenges. The authors describe suitable approaches and implementation issues that are derived from selected IEC 62351 requirements following the product lifecycle process. (orig.)

  14. Characterization and standardized radiation qualities deployment - NBR IEC 61225 - in a animal irradiator

    International Nuclear Information System (INIS)

    Carvalho, Samara; Magalhaes, Luis Alexandre Goncalves

    2015-01-01

    The present work consisted in the determination of additional aluminum filters, so that the Animal Irradiator of the Laboratory of Radiological Sciences-UERJ can operate in accordance with standard IEC 61267: 2005. In order to perform the measurements necessary for the determination of these filters, it was developed an additional filter positioning system coupled to the X-ray tube. The determination of these filters was performed to obtain the first half value layer (HVL) according to the window with the values given by the IEC 61267: 2005. It was used IPEN SRS-78 (Institute of Physics and Engineering in Medicine) software for the estimation of the total amount of the additional filtration through the measurements values of the first HVL. (author)

  15. IEC planning: eight state-of-the-art principles.

    Science.gov (United States)

    Middleton, J

    1983-12-01

    Considerable experience and research has been accumulated in the last 20 years on the ways in which information/education/communication (IEC) programs can be effectively designed, implemented, and evaluated. Possibly more effort has focused on population and family planning IEC than on any other sectoral program of development communication. Several principles have emerged which, taken together, define the state of the art in the field. These principles provide a framework of experience which can guide the development of comprehensive IEC programs. They include: policy and resource assessment; audience analysis; strategy design; message research and pretesting; participation and feedback; management; evaluation; and collaboration. The nature of the national policy base for population and family planning programs will determine the goals and approaches of the IEC program. Strong policies of limitation on popultion growth lead to equally strong and pervasive IEC efforts designed to directly affect contraceptive behavior. Assessment of existing policy is an essential aspect of the design of an effective IEC program. Policies establish the rationale and boundaries for action. Population and family planning programs are concerned with some of the most intimate human behavior. Consequently, structured and sensitive audience analysis has become an integral part of the design of IEC programs. The design of communication strategy requires clearly stated objectives. Principles of human learning are used to structure information appropriately. Message research and pretesting have become integral components of the strategy design process. Small scale research on specific objectives is necessary to establish the basis for message design. Audience participation and feedback in remaining phases of program development and implementation are important. The management of an IEC program requires a specific combination of planning, flexibility, and creativity. Evaluation of program

  16. Operator performance in non-destructive testing: A study of operator performance in a performance test

    Energy Technology Data Exchange (ETDEWEB)

    Enkvist, J.; Edland, A.; Svenson, Ola [Stockholm Univ. (Sweden). Dept. of Psychology

    2000-05-15

    In the process industries there is a need of inspecting the integrity of critical components without disrupting the process. Such in-service inspections are typically performed with non-destructive testing (NDT). In NDT the task of the operator is to (based on diagnostic information) decide if the component can remain in service or not. The present study looks at the performance in NDT. The aim is to improve performance, in the long run, by exploring the operators' decision strategies and other underlying factors and to this way find out what makes some operators more successful than others. Sixteen operators performed manual ultrasonic inspections of four test pieces with the aim to detect (implanted) cracks. In addition to these performance demonstration tests (PDT), the operators performed independent ability tests and filled out questionnaires. The results show that operators who trust their gut feeling more than the procedure (when the two come to different results) and that at the same time have a positive attitude towards the procedure have a higher PDT performance. These results indicate the need for operators to be motivated and confident when performing NDT. It was also found that the operators who performed better rated more decision criteria higher in the detection phase than the operators who performed worse. For characterizing it was the other way around. Also, the operators who performed better used more time, both detecting and characterizing, than the operators who performed worse.

  17. Operator performance in non-destructive testing: A study of operator performance in a performance test

    International Nuclear Information System (INIS)

    Enkvist, J.; Edland, A.; Svenson, Ola

    2000-05-01

    In the process industries there is a need of inspecting the integrity of critical components without disrupting the process. Such in-service inspections are typically performed with non-destructive testing (NDT). In NDT the task of the operator is to (based on diagnostic information) decide if the component can remain in service or not. The present study looks at the performance in NDT. The aim is to improve performance, in the long run, by exploring the operators' decision strategies and other underlying factors and to this way find out what makes some operators more successful than others. Sixteen operators performed manual ultrasonic inspections of four test pieces with the aim to detect (implanted) cracks. In addition to these performance demonstration tests (PDT), the operators performed independent ability tests and filled out questionnaires. The results show that operators who trust their gut feeling more than the procedure (when the two come to different results) and that at the same time have a positive attitude towards the procedure have a higher PDT performance. These results indicate the need for operators to be motivated and confident when performing NDT. It was also found that the operators who performed better rated more decision criteria higher in the detection phase than the operators who performed worse. For characterizing it was the other way around. Also, the operators who performed better used more time, both detecting and characterizing, than the operators who performed worse

  18. Ecotoxicological testing of performance fluids

    International Nuclear Information System (INIS)

    Kallqvist, T.

    1990-05-01

    The report deals with a project comprising the testing of drilling fluids concerning ecotoxicology, biological degradation, and toxicity. Two types of drilling fluids were tested for toxic effects on marine algae and biological degradability. A fluid based on mineral oil was readily degradable (98% DOC removal in 28 days) while an ether based oil degraded more slowly (56% DOC removal in 28 days). The toxicity of both fluids was tested after emulsification of the oils in water and separating the oil and water phase after equilibration. The EC 50 values obtained with this approach were 8.15 g/l for the oil based fluid and 116 g/l for the ether fluid. 9 figs., 8 tabs

  19. A fully automated system for ultrasonic power measurement and simulation accordingly to IEC 61161:2006

    International Nuclear Information System (INIS)

    Costa-Felix, Rodrigo P B; Alvarenga, Andre V; Hekkenberg, Rob

    2011-01-01

    The ultrasonic power measurement, worldwide accepted, standard is the IEC 61161, presently in its 2nd edition (2006), but under review. To fulfil its requirements, considering that a radiation force balance is to be used as ultrasonic power detector, a large amount of raw data (mass measurement) shall be collected as function of time to perform all necessary calculations and corrections. Uncertainty determination demands calculation effort of raw and processed data. Although it is possible to be undertaken in an old-fashion way, using spread sheets and manual data collection, automation software are often used in metrology to provide a virtually error free environment concerning data acquisition and repetitive calculations and corrections. Considering that, a fully automate ultrasonic power measurement system was developed and comprehensively tested. A 0,1 mg of precision balance model CP224S (Sartorius, Germany) was used as measuring device and a calibrated continuous wave ultrasound check source (Precision Acoustics, UK) was the device under test. A 150 ml container filled with degassed water and containing an absorbing target at the bottom was placed on the balance pan. Besides the feature of automation software, a routine of power measurement simulation was implemented. It was idealized as a teaching tool of how ultrasonic power emission behaviour is with a radiation force balance equipped with an absorbing target. Automation software was considered as an effective tool for speeding up ultrasonic power measurement, while allowing accurate calculation and attractive graphical partial and final results.

  20. Comparison and Analysis of IEEE 344 and IEC 60980 standards for harmonization of seismic qualification of safety-related equipment

    International Nuclear Information System (INIS)

    Lee, Young Ok; Kim, Jong Seog; Seo, Jeong Ho; Kim, Myung Jun

    2011-01-01

    The seismic qualification of safety related equipment in nuclear power plants should demonstrate an equipment's ability to perform its safety function during/or after the time it is subjected to the forces resulting from one SSE. In addition, the equipment must withstand the effects of a number of OBEs, preceding the SSE. IEEE 344 and IEC 60980 present the criteria for establishing procedures demonstrating that the Class 1E equipment can meet its performance requirement during seismic events. Currently, IEEE 344 is used for regulation of nuclear power plant in the United State whereas IEC 60980 is mainly used in Europe. In particular, NPPs of France and China apply with RCC-E and GB that are domestic standards, respectively. Equipment supplier and Utility have difficulties because of different applicable standards. Equipment supplier to export S/R components/equipment to other standard area performs additional seismic qualification. For example, equipment are qualifies according to IEC 60980, RCC-E, GB although they have been qualified in accordance with IEEE 344. Also, utility to attempt power up-rate, life extension of NPP constructed under rules of RCC-E such as Ulchin NPP 1 and 2 has similar difficulties. RCC-E endorses IEC 60980 and GB is almost same as IEC 60980 except minor difference of earthquake environment definition. Therefore this paper surveys the similarities and differences between IEEE 344 and IEC 60980. In addition, this paper considers how the two sets of standards may be used in a complementary fashion to be possible using one or the other standard area

  1. Strategies for Refining IEC 61400-2: Wind Turbine Generator Systems - Part 2: Safety of Small Wind Turbines: Preprint

    International Nuclear Information System (INIS)

    van Dam, J. J. D.; Forsyth, T. L.; Hansen, A. C.

    2001-01-01

    This paper provides a status of the changes currently being made by IEC Maintenance Team 02 (MT02) to the existing IEC 61400-2 ''Safety of small wind turbines.'' In relation to the work done by IEC MT02, work has been done by NREL and Windward Engineering under the DOE/NREL Small Wind Turbine (SWT) Project. Aeroelastic models were built and measurements taken on a Whisper H40 turbine and an AOC 15/50. Results from this study were used to verify the simple design equations. This verification will be used to evaluate how changes made in the design load estimation section of the standard work out for a broad range of turbine configurations. The work presented here builds on work performed by Van Hulle (1996)

  2. ISO/IEC 17025 Sysmex R-500 hematology reticulocyte analyzer validation.

    Science.gov (United States)

    Dimopoulou, H A; Theodoridis, T; Galea, V; Christopoulou-Cokkinou, V; Spyridaki, M-H E; Georgakopoulos, C G

    2007-01-01

    The Sysmex R-500 (R-500) Hematology Analyzer is a bench-top system appropriate for the analysis of limited batches of blood samples. The R-500 provides percentage proportional (RET%), absolute reticulocyte (RET#), and absolute red blood cell (RBC#) counts. The system was validated at the Doping Control Laboratory of Athens, according to the International Committee for Standardization in Hematology, International Standards Organization (ISO/IEC) 17025, and World Antidoping Agency (WADA) specifications. The instrument calibration was performed according to the manufacturer and validation parameters comprised linearity, precision, uncertainty (intermediate and long-term precision), comparability, effect of drift, carryover, stability, and accuracy. The linearity and the comparability studies for RET#, RET%, and RBC# were expressed in regression factors (R2) and coefficients of correlation [r(x, y)], respectively. For the precision studies, the coefficients of variation for RET#, RET%, and RBC# were 9.49%, 9.83%, and ISO/IEC 17025 and WADA specifications.

  3. Control and management of distribution system with integrated DERs via IEC 61850 based communication

    Directory of Open Access Journals (Sweden)

    Ikbal Ali

    2017-06-01

    Full Text Available Distributed Energy Resources (DERs are being increasingly integrated in the distribution systems and resulting in complex power flow scenarios. In such cases, effective control, management and protection of distribution systems becomes highly challenging. Standardized and interoperable communication in distribution systems has the potential to deal with such challenges to achieve higher energy efficiency and reliability. Ed. 2 of IEC 61850 standards, for utility automation, standardizing the exchange of data among different substations, DERs, control centers, PMUs and PDCs. This paper demonstrates the modelling of information and services needed for control, management and protection of distribution systems with integrated DERs. This paper has used IP tunnels and/or mapping over IP layer for transferring IEC 61850 messages, such as sample values (SVs and GOOSE (Generic Object Oriented Substation Event, over distribution system Wide Area Network (WAN. Finally performance of the proposed communication configurations for different applications is analyzed by calculating End-to-End (ETE delay, throughput and jitter.

  4. Standardization in SEK/IEC 2012; Standardisering inom SEK/IEC 2012

    Energy Technology Data Exchange (ETDEWEB)

    Olausson, Susanne

    2013-02-15

    This report describes the work of standardization in the electrotechnical area and collaboration in selected committees of SEK, IEC and CENELEC. Electrotechnical standardization is traditionally an area characterized of large international collaboration, cooperation between government agencies, manufacturers and users. Standardization work has previously been a natural part of power companies' activities related to the extensive expansion activities, own construction business and to generally maintain a good knowledge base of staff. Taking part in the establishment of standards have been a good way to ensure long-term approach made in investments and a guarantee of open competition between manufacturers. Maintenance efforts have also been reduced by using established standards. The acceleration of technological progress has, however, increased pressure on standardization organizations, committee work etc. to keep up with time before the de facto standards have been applied in excessive degree. Reregulation of the electricity market in Sweden has also led to a difference in the standardization process. An increasing number of experts who have worked with standards is currently located at power companies consultancy activities. What was once a natural part of the power companies' internal skills provision today are exposed to a commercial assessment. In 1994 Elforsk was appointed by the owners the task of coordinating the power companies' joint standardization work within specifically electrical engineering. After an initial assessment of the activities was decided that remunera would be paid to the members in SEK, IEC and CENELEC who either participated in selected projects with international character or was either secretary or chairman of the Swedish technical committees (SEK)

  5. The role of the IEC and ISO in radiological protection

    International Nuclear Information System (INIS)

    White, D.F.

    1976-01-01

    The history, objectives, structures and functions of the International Electrotechnical Commission (IEC) and the International Organisation for Standardisation (ISO) are summarized. The IEC is affiliated to the ISO as its electrical division, but has technical and financial autonomy. Member countries of the EEC may be committed to the adoption of their formal agreements ('Standards') if these become incorporated as Directives. The national standardisation organisations, such as BSI in the U.K., form national committees and are responsible for submitting to the IEC the co-ordinated national viewpoints on particular subjects. The overall links between the technical committees and sub-committees of the ISO, IEC and BSI in the field of radiological protection are tabulated, and the relevant International Standards produced, or in the course of preparation, by the appropriate committees of the ISO and the IEC are listed. The bulk of the effort of the BSI committees is now aimed at the production of acceptable international standards. Compatible national standards then follow. This policy is in contrast to the earlier initial emphasis on national standards, and the improved international collaboration has had two welcome effects. The selection of proposals for standards is more critical, and compatibility with the relevant ICRP and ICRU publications is almost a prerequisite for any international standard. (U.K.)

  6. Inertial electrostatic confinement I(IEC) neutron sources

    International Nuclear Information System (INIS)

    Nebel, R.A.; Barnes, D.C.; Caramana, E.J.; Janssen, R.D.; Nystrom, W.D.; Tiouririne, T.N.; Trent, B.C.; Miley, G.H.; Javedani, J.

    1995-01-01

    Inertial Electrostatic Confinement (IEC) is one of the earliest plasma confinement concepts, having first been suggested by P.T. Farnsworth in the 1950s. The concept involves a simple apparatus of concentric spherical electrostatic grids or a combination of grids and magnetic fields. An electrostatic structure is formed from the confluence of electron or ion beams. Gridded IEC systems have demonstrated neutron yields as high as 2*10 [10]. neutrons/sec in steady state. These systems have considerable potential as small, inexpensive, portable neutron sources for assaying applications. Neutron tomography is also a potential application. This paper discusses the IEC concept and how it can be adapted to a steady-state assaying source and an intense pulsed neutron source. Theoretical modeling and experimental results are presented

  7. IEC fusion: The future power and propulsion system for space

    International Nuclear Information System (INIS)

    Hammond, Walter E.; Coventry, Matt; Miley, George H.; Nadler, Jon; Hanson, John; Hrbud, Ivana

    2000-01-01

    Rapid access to any point in the solar system requires advanced propulsion concepts that will provide extremely high specific impulse, low specific power, and a high thrust-to-power ratio. Inertial Electrostatic Confinement (IEC) fusion is one of many exciting concepts emerging through propulsion and power research in laboratories across the nation which will determine the future direction of space exploration. This is part of a series of papers that discuss different applications of the Inertial Electrostatic Confinement (IEC) fusion concept for both in-space and terrestrial use. IEC will enable tremendous advances in faster travel times within the solar system. The technology is currently under investigation for proof of concept and transitioning into the first prototype units for commercial applications. In addition to use in propulsion for space applications, terrestrial applications include desalinization plants, high energy neutron sources for radioisotope generation, high flux sources for medical applications, proton sources for specialized medical applications, and tritium production

  8. Implementing IEC 61850-7-420 DER Logical Nodes in a single board

    Directory of Open Access Journals (Sweden)

    Anderson Salazar-Zuluaga

    2017-09-01

    Full Text Available This article discusses the implementation of a variety of logical nodes (LNs of power generation systems based on distributed energy resources (DER in a single board computer (SBC. The SBC allows for the acquisition and encapsulation of analog signals from a photovoltaic (PV array with batteries, based on the IEC 61850-7-420 standard. To achieve this, an SBC integrated with an analog-digital conversion card (ADC enables to read the system’s analog values. The SBC communicates with the ADC card to encapsulate the collected data in the IEC 61850 data object by using the corresponding logical node (LN. An open license library was used to create the IEC 61850 server inside the SBC and the driver of the ADC card manufacturer to communicate both cards. This work aims to develop LNs for DERs in such way that manufacturers of power generation technologies based on renewable sources (such as the sun and/or the wind implement Intelligent Electronic Devices (IED and controllers in accordance with the scope of the standard for these logical nodes (LNs. Finally, the communication testing of the implementation and the results obtained are presented.

  9. IEC-based neutron generator for security inspection system

    International Nuclear Information System (INIS)

    Miley, G.H.; Wu, L.; Kim, H.J.

    2005-01-01

    Use of a combined X-ray and neutron source for security inspections based on Inertial Electrostatic Confinement (IEC) fusion is discussed. Current inspection systems typically use X-ray techniques, but thermal neutron analysis (TNA) and fast neutron analysis (FNA), allow expanded detection of certain types of explosives. The integrated unit proposed here uses three separate IEC sources producing 14 and 2.45 MeV neutrons plus soft X-rays. This combination allows multiple detection methods with the composite signal analysis being done by a fuzzy logic system, significantly reducing false signals. (author)

  10. Integrated Performance Testing Workshop, Modules 6 - 11

    Energy Technology Data Exchange (ETDEWEB)

    Leach, Janice; Torres, Teresa M.

    2012-10-01

    These modules cover performance testing of: Interior Detection Systems; Access Controls; Exterior Detection Systems; Video Assessment Systems; SNM / Contraband Detection Systems; Access Delay Elements

  11. TU-G-213-03: IEC Subcommittee 62C (Equipment for Radiotherapy, Nuclear Medicine and Radiation Dosimetry): Recent and Active Projects

    Energy Technology Data Exchange (ETDEWEB)

    Culberson, W. [University of Wisconsin - Madison (United States)

    2015-06-15

    The International Electrotechnical Commission (IEC) writes standards that manufacturers of electrical equipment must comply with. Medical electrical equipment, such as medical imaging, radiation therapy, and radiation dosimetry devices, fall under Technical Committee 62. Of particular interest to medical physicists are the standards developed within Subcommittees (SC) 62B, which addresses diagnostic radiological imaging equipment, and 62C, which addresses equipment for radiation therapy, nuclear medicine and dosimetry. For example, a Working Group of SC 62B is responsible for safety and quality assurance standards for CT scanners and a Working Group of SC 62C is responsible for standards that set requirements for dosimetric safety and accuracy of linacs and proton accelerators. IEC standards thus have an impact on every aspect of a medical physicist’s job, including equipment testing, shielding design, room layout, and workflow. Consequently, it is imperative that US medical physicists know about existing standards, as well as have input on those under development or undergoing revision. The structure of the IEC and current standards development work will be described in detail. The presentation will explain how US medical physicists can learn about IEC standards and contribute to their development. Learning Objectives: Learn about the structure of the IEC and the influence that IEC standards have on the design of equipment for radiology and radiation therapy. Learn about the mechanisms by which the US participates in the development and revision of standards. Understand the specific requirements of several standards having direct relevance to diagnostic and radiation therapy physicists.

  12. Comparison of ANSI, IEC and CSA standards durability requirements on station-type metal oxide surge arresters for EHV power systems

    International Nuclear Information System (INIS)

    Hamel, A.; St-Jean, G.

    1992-01-01

    This paper presents an analysis of stresses applied to two actual types of station class surge arresters of the same voltage rating when tested for durability as prescribed by American (ANSI) International (IEC) and Canadian (CSA) standards for 315 kV and 734 kV power systems. The analysis which is made with an experimentally validated arrester model, reveals that the IEC duty cycle test is the most severe of all. In fact it can bring the varistors of an actual station-type arrester to a peak temperature of 129 degrees C, which leaves a margin of only 46 degrees C to its thermal stability limit at maximum continuous operating voltage (MCOV). Another actual arrester using lesser V-I-T varistor characteristics but larger varistor volume and better heat transfer from inside to outside the arrester, produces 103 degrees C which corresponds to a slightly better temperature margin of 49 degrees C. It is observed that even when using the lower performance V-I-T characteristics of the latter arrester, a thin-wall arrester housing design can improve heat transfer to a point where the margin improves to 101 degrees C on a hypothetical arrester

  13. Inertial electrostatic confinement (IEC) fusion fundamentals and applications

    CERN Document Server

    Miley, George H

    2014-01-01

    This book provides readers with an introductory understanding of Inertial Electrostatic Confinement (IEC), a type of fusion meant to retain plasma using an electrostatic field. IEC provides a unique approach for plasma confinement, as it offers a number of spin-off applications, such as a small neutron source for Neutron Activity Analysis (NAA), that all work towards creating fusion power. The IEC has been identified in recent times as an ideal fusion power unit because of its ability to burn aneutronic fuels like p-B11 as a result of its non-Maxwellian plasma dominated by beam-like ions. This type of fusion also takes place in a simple mechanical structure small in size, which also contributes to its viability as a source of power. This book posits that the ability to study the physics of IEC in very small volume plasmas makes it possible to rapidly investigate a design to create a power-producing device on a much larger scale. Along with this hypothesis the book also includes a conceptual experiment propose...

  14. ISO/IEC 38500 the IT governance standard

    CERN Document Server

    Calder, Alan

    2008-01-01

    The emergence of ISO/IEC 38500 - the international standard for the corporate governance of information and communication technology - puts boards around the world in a position from which they can take effective action to apply core governance principles to their information and communication technology.

  15. Can we use IEC 61850 for safety related functions?

    Directory of Open Access Journals (Sweden)

    Luca Rocca

    2016-08-01

    Full Text Available Safety is an essential issue for processes that present high risk for human beings and environment. An acceptable level of risk is obtained both with actions on the process itself (risk reduction and with the use of special safety systems that switch the process into safe mode when a fault or an abnormal operation mode happens. These safety systems are today based on digital devices that communicate through digital networks. The IEC 61508 series specifies the safety requirements of all the devices that are involved in a safety function, including the communication network. Also electrical generation and distribution systems are processes that may have a significant level of risk, so the criteria stated by the IEC 61508 applies. Starting from this consideration, the paper analyzes the safety requirement for the communication network and compare them with the services of the communication protocol IEC 61850 that represents the most used protocol for automation of electrical plants. The goal of this job is to demonstrate that, from the technical point of view, IEC 61850 can be used for implementing safety-related functions, even if a formal safety certification is still missing.

  16. Performance test for a solar water heater

    Science.gov (United States)

    1979-01-01

    Two reports describe procedures and results of performance tests on domestic solar powered hot water system. Performance tests determine amount of energy collected by system, amount of energy delivered to solar source, power required to operate system and maintain proper tank temperature, overall system efficiency, and temperature distribution in tank.

  17. Performance Testing of Download Services of COSMC

    Directory of Open Access Journals (Sweden)

    Jiří Horák

    2013-11-01

    Full Text Available The paper presents results of performance tests of download services of Czech Office of Surveying, Mapping and Cadastre according to INSPIRE  requirements. Methodology of testing is explained, including monitoring performance  of reference servers. 26 millions of random requests were generated for each monitored operation, layer and coordinate system. The temporal development of performance indicators are analyzed and discussed. Results of performance tests approve the compliance with INSPIRE qualitative requirements for download services. All monitored services satisfy requirements of latency, capacity and availability. The latency and availability requirements are fulfilled with an abundant reserve. No problems in structure and content of responses were detected.

  18. The tendency of medical electrical equipment - IEC 60601-2-54: Particular requirements for the basic safety and essential performance of x-ray equipment for radiography and radioscopy

    International Nuclear Information System (INIS)

    Roh, Young Hoon; Kim, Jung Min

    2015-01-01

    Medical electrical equipment - Part 1: General requirement for basic safety and essential performance of MFDS was revised as 3th edition and Medical electrical equipment Part 2-54: Particular requirements for the basic safety and essential performance of X-ray equipment will be expected to be announced as notification. Therefore this technical report was written to introduce provision of the particular requirements, replacement, addition, amendment. The purpose of this particular requirements is to secure requirements for basic safety and essential performance of X-ray equipment for radiography and radioscopy. X-ray high voltage generator, mechanical protective device, protection against radiation is included in this particular requirements. Medical electrical equipment - Part 1, Part 1-2, Part 1-3 is applied to this particular requirements. If the requirements is announced as notification, It is expected to widen understanding for basic safety and essential performance of X-ray equipment for radiography and radioscopy and play a part to internationalize of medical equipment

  19. IEC Information Bulletin, No. 39, First Quarter 2012

    International Nuclear Information System (INIS)

    2012-01-01

    On 28 March, the Incident and Emergency Centre (IEC) conducted its first Full Response Exercise of 2012. Over 30 staff members from the Department of Nuclear Safety and Security and the Division of Public Information participated. The IEC was activated into full response mode at approximately 9 a.m. This full response lasted most of the day and led up to a 'lessons learned' discussion at the end of the day. Florian Baciu, the IEC Response System Coordinator, noted: ''Although many of the participants were involved in the IAEA response to the accident at TEPCO's Fukushima Daiichi nuclear power plant, this exercise gave them the opportunity to practice procedures which they had not used since then. In addition, we had several staff members relatively new to the IAEA's Incident and Emergency System among the participants.'' Hilaire Mansoux, one of the Emergency Response Managers for the exercise, stated: ''The scenario was quite complex, requiring a good flow of information.'' The IEC staff had developed a scenario in which a meltdown and resulting release of radioactive materials to the environment from a nuclear power plant in a Member State was caused by a criminal act. All outside organizations were represented by the IEC staff in a simulation cell, which periodically contributed information using telephone calls, faxes, emails and messages through the IAEA's Unified System for Information Exchange in Incidents and Emergencies (USIE). The tasks of the IAEA in the area of emergency response were expanded through the mandate given by Member States following the events at Fukushima Daiichi last year. In the area of communication and information dissemination, the IAEA was also given, among other tasks, the mandate to assess emergency situations by providing 'analysis of available information and prognosis of possible scenarios'. Together with other matters, the assessment aspect was addressed in this full response exercise.

  20. Corrosion performance tests for reinforcing steel in concrete : test procedures.

    Science.gov (United States)

    2009-09-01

    The existing test method to assess the corrosion performance of reinforcing steel embedded in concrete, mainly : ASTM G109, is labor intensive, time consuming, slow to provide comparative results, and often expensive. : However, corrosion of reinforc...

  1. Vitrification Facility integrated system performance testing report

    International Nuclear Information System (INIS)

    Elliott, D.

    1997-01-01

    This report provides a summary of component and system performance testing associated with the Vitrification Facility (VF) following construction turnover. The VF at the West Valley Demonstration Project (WVDP) was designed to convert stored radioactive waste into a stable glass form for eventual disposal in a federal repository. Following an initial Functional and Checkout Testing of Systems (FACTS) Program and subsequent conversion of test stand equipment into the final VF, a testing program was executed to demonstrate successful performance of the components, subsystems, and systems that make up the vitrification process. Systems were started up and brought on line as construction was completed, until integrated system operation could be demonstrated to produce borosilicate glass using nonradioactive waste simulant. Integrated system testing and operation culminated with a successful Operational Readiness Review (ORR) and Department of Energy (DOE) approval to initiate vitrification of high-level waste (HLW) on June 19, 1996. Performance and integrated operational test runs conducted during the test program provided a means for critical examination, observation, and evaluation of the vitrification system. Test data taken for each Test Instruction Procedure (TIP) was used to evaluate component performance against system design and acceptance criteria, while test observations were used to correct, modify, or improve system operation. This process was critical in establishing operating conditions for the entire vitrification process

  2. The Effects of Humor on Test Anxiety and Test Performance

    Science.gov (United States)

    Tali, Glenda

    2017-01-01

    Testing in an academic setting provokes anxiety in all students in higher education, particularly nursing students. When students experience high levels of anxiety, the resulting decline in test performance often does not represent an accurate assessment of students' academic achievement. This quantitative, experimental study examined the effects…

  3. Verification testing of the compression performance of the HEVC screen content coding extensions

    Science.gov (United States)

    Sullivan, Gary J.; Baroncini, Vittorio A.; Yu, Haoping; Joshi, Rajan L.; Liu, Shan; Xiu, Xiaoyu; Xu, Jizheng

    2017-09-01

    This paper reports on verification testing of the coding performance of the screen content coding (SCC) extensions of the High Efficiency Video Coding (HEVC) standard (Rec. ITU-T H.265 | ISO/IEC 23008-2 MPEG-H Part 2). The coding performance of HEVC screen content model (SCM) reference software is compared with that of the HEVC test model (HM) without the SCC extensions, as well as with the Advanced Video Coding (AVC) joint model (JM) reference software, for both lossy and mathematically lossless compression using All-Intra (AI), Random Access (RA), and Lowdelay B (LB) encoding structures and using similar encoding techniques. Video test sequences in 1920×1080 RGB 4:4:4, YCbCr 4:4:4, and YCbCr 4:2:0 colour sampling formats with 8 bits per sample are tested in two categories: "text and graphics with motion" (TGM) and "mixed" content. For lossless coding, the encodings are evaluated in terms of relative bit-rate savings. For lossy compression, subjective testing was conducted at 4 quality levels for each coding case, and the test results are presented through mean opinion score (MOS) curves. The relative coding performance is also evaluated in terms of Bjøntegaard-delta (BD) bit-rate savings for equal PSNR quality. The perceptual tests and objective metric measurements show a very substantial benefit in coding efficiency for the SCC extensions, and provided consistent results with a high degree of confidence. For TGM video, the estimated bit-rate savings ranged from 60-90% relative to the JM and 40-80% relative to the HM, depending on the AI/RA/LB configuration category and colour sampling format.

  4. Integrated Performance Testing for Nonproliferation Support Project

    Energy Technology Data Exchange (ETDEWEB)

    Johns, Russell; Bultz, Garl Alan; Byers, Kenneth R.; Yaegle, William

    2013-08-20

    The objective of this workshop is to provide participants with training in testing techniques and methodologies for assessment of the performance of: Physical Protection system elements; Material Control and Accounting (MC&A) system elements.

  5. Summary of functional and performance test procedures

    DEFF Research Database (Denmark)

    Mitzel, Jens; Gülzow, Erich; Friedrich, K. Andreas

    Different Test Modules (TM) are defined for the functional and performance characterization of a PEMFC stack. The master document TM2.00 defines requirements and methodology for parameter variation, stability and data acquisition.......Different Test Modules (TM) are defined for the functional and performance characterization of a PEMFC stack. The master document TM2.00 defines requirements and methodology for parameter variation, stability and data acquisition....

  6. Cascade Distiller System Performance Testing Interim Results

    Science.gov (United States)

    Callahan, Michael R.; Pensinger, Stuart; Sargusingh, Miriam J.

    2014-01-01

    The Cascade Distillation System (CDS) is a rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. Based upon the results of the 2009 distillation comparison test (DCT) and recommendations of the expert panel, the Advanced Exploration Systems (AES) Water Recovery Project (WRP) project advanced the technology by increasing reliability of the system through redesign of bearing assemblies and improved rotor dynamics. In addition, the project improved the CDS power efficiency by optimizing the thermoelectric heat pump (TeHP) and heat exchanger design. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell d International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades as compared to previous system performance. The system was challenged with Solution 1 from the NASA Exploration Life Support (ELS) distillation comparison testing performed in 2009. Solution 1 consisted of a mixed stream containing human-generated urine and humidity condensate. A secondary objective of this testing is to evaluate the performance of the CDS as compared to the state of the art Distillation Assembly (DA) used in the ISS Urine Processor Assembly (UPA). This was done by challenging the system with ISS analog waste streams. This paper details the results of the AES WRP CDS performance testing.

  7. Severe fuel-damage scoping test performance

    International Nuclear Information System (INIS)

    Gruen, G.E.; Buescher, B.J.

    1983-01-01

    As a result of the Three Mile Island Unit-2 (TMI-2) accident, the Nuclear Regulatory Commission has initiated a severe fuel damage test program to evaluate fuel rod and core response during severe accidents similar to TMI-2. The first test of Phase I of this series has been successfully completed in the Power Burst Facility at the Idaho National Engineering Laboratory. Following the first test, calculations were performed using the TRAC-BD1 computer code with actual experimental boundary conditions. This paper discusses the test conduct and performance and presents the calculated and measured test bundle results. The test resulted in a slow heatup to 2000 K over about 4 h, with an accelerated reaction of the zirconium cladding at temperatures above 1600 K in the lower part or the bundle and 2000 K in the upper portion of the bundle

  8. Work zone performance measures pilot test.

    Science.gov (United States)

    2011-04-01

    Currently, a well-defined and validated set of metrics to use in monitoring work zone performance do not : exist. This pilot test was conducted to assist state DOTs in identifying what work zone performance : measures can and should be targeted, what...

  9. RHIC sextant test: Accelerator systems and performance

    Energy Technology Data Exchange (ETDEWEB)

    Pilat, F.; Trbojevic, D.; Ahrens, L. [and others

    1997-08-01

    One sextant of the RHIC Collider was commissioned in early 1997 with beam. We describe here the performance of the accelerator systems, instrumentation subsystems and application software. We also describe a ramping test without beam that took place after the commissioning with beam. Finally, we analyze the implications of accelerator systems performance and their impact on the planning for RHIC installation and commissioning.

  10. RHIC sextant test: Accelerator systems and performance

    International Nuclear Information System (INIS)

    Pilat, F.; Trbojevic, D.; Ahrens, L.

    1997-01-01

    One sextant of the RHIC Collider was commissioned in early 1997 with beam. We describe here the performance of the accelerator systems, instrumentation subsystems and application software. We also describe a ramping test without beam that took place after the commissioning with beam. Finally, we analyze the implications of accelerator systems performance and their impact on the planning for RHIC installation and commissioning

  11. Performance of smokeless gasoline fire test facility

    International Nuclear Information System (INIS)

    Griffin, J.F.; Watkins, R.A.

    1978-01-01

    Packaging for radioactive materials must perform satisfactorily when subjected to temperatures simulating an accident involving a fire. The new thermal test facility has proved to be a reliable method for satisfactorily performing the required test. The flame provides sufficient heat to assure that the test is valid, and the temperature can be controlled satisfactorily. Also, the air and water mist systems virtually eliminate any smoke and thereby exceed the local EPA requirements. The combination of the two systems provides an inexpensive, low maintenance technique for elimination of the smoke plume

  12. A collimator-converter system for IEC propulsion

    International Nuclear Information System (INIS)

    Momota, Hiromu; Miley, George H.

    2002-01-01

    The collimator-converter system extracts fusion power from D- 3 He fueled IEC devices and provides electricity needed to operate ionic thrusters and other-power components. The whole system is linear and consists of a series of collimator units at the center, magnetic expander units at both sides of the fusion units, followed by direct energy converters at both ends. This system is enclosed in a vacuum chamber with a magnetic channel provided by magnetic solenoids out of respective chambers. The fusion unit consists of an IEC fusion core, a pair of coils anti-parallel to the solenoid coils, and a stabilization coil that stabilizes the position of coil pair coils. The IEC fusion core is installed at the center of the pair coils. After the magnetic expander, velocities of fusion particles from D- 3 He fueled IEC units are directed to the magnetic channel, which guides energetic fusion particles as well as leaking unburned fuel components to a high-efficiency traveling wave direct energy converter (TWDEC). Leaking unburned fuel components are separated with a magnetic separator at the entrance of a direct energy converter and pumped out for further refueling. A TWDEC is made of an array of metallic meshed grids, each of which is connected to every terminal with an external transmission circuit. The transmission line couples to the direct energy converter. Substations for electricity, a cryogenic plant, and various power control systems are outside of the vacuum chamber. The length of the cylindrical system is essentially determined by the proton energy of 14.8 MeV and the radius should be large so as to reduce power flow density. The present system provides 250 MW f fusion power and converting it to 150 MW c electricity. Its size is 150 m(length)x6.6 m(diameter) in size and 185 tons in weight

  13. NNWSI waste form performance test development

    International Nuclear Information System (INIS)

    Bates, J.K.; Gerding, T.J.

    1984-01-01

    A test method has been developed to measure the release of radionuclides from the waste package under simulated NNWSI repository conditions, and to provide information concerning materials interactions that may occur in the repository. Data from 13 weeks of unsaturated testing are discussed and compared to that from a 13-week analog test. The data indicate that the waste form test is capable of producing consistent, reproducible results that will be useful in evaluating the role of the waste in the long-term performance of the repository. 6 references, 3 figures

  14. Preliminary test conditions for KNGR SBLOCA DVI ECCS performance test

    International Nuclear Information System (INIS)

    Bae, Kyoo Whan; Song, Jin Ho; Chung, Young Jong; Sim, Suk Ku; Park, Jong Kyun

    1999-03-01

    The Korean Next Generation Reactor (KNGR) adopts 4-train Direct Vessel Injection (DVI) configuration and injects the safety injection water directly into the downcomer through the 8.5'' DVI nozzle. Thus, the thermal hydraulic phenomena such as ECCS mixing and bypass are expected to be different from those observed in the cold leg injection. In order to investigate the realistic injection phenomena and modify the analysis code developed in the basis of cold leg injection, thermal hydraulic test with the performance evaluation is required. Preliminarily, the sequence of events and major thermal hydraulic phenomena during the small break LOCA for KNGR are identified from the analysis results calculated by the CEFLASH-4AS/REM. It is shown from the analysis results that the major transient behaviors including the core mixture level are largely affected by the downcomer modeling. Therefore, to investigate the proper thermal hydraulic phenomena occurring in the downcomer with limited budget and time, the separate effects test focusing on this region is considered to be effective and the conceptual test facility based on this recommended. For this test facility the test initial and boundary conditions are developed using the CEFLASH-4AS/REM analysis results that will be used as input for the preliminary test requirements. The final test requirements will be developed through the further discussions with the test performance group. (Author). 10 refs., 18 tabs., 4 figs

  15. Direct energy conversion for IEC fusion for space applications

    International Nuclear Information System (INIS)

    Momota, Hiromu; Nadler, Jon; Miley, George H.

    2000-08-01

    The paper describes a concept of extracting fusion power from D- 3 He fueled IEC (Inertia Electrostatic Configuration) devices. The fusion system consists of a series of fusion modules and direct energy converters at an end or at both ends. This system of multiple units is linear and is connected by a magnetic field. A pair of coils anti-parallel to the magnetic field yields a field-null domain at the center of each unit as required for IEC operation. A stabilizing coil installed between the coil pairs eliminates the strong attractive force between the anti-parallel coils. Accessible regions for charged particle trajectories are essentially isolated from the coil structure. Thus, charged particles are directed along magnetic field lines to the direct energy converter without appreciable losses. A direct energy converter unit designed to be compatible to this unique system is also described. It basically consists of a separator and a traveling wave converter. A separator separates low energy ions and electron from the 14.7 MeV fusion protons and then converts their energy into electricity. In the traveling wave direct energy converter, fusion protons are modulated to form bunches. It couples with a transmission line to couple AC power out. The overall conversion efficiency of this system, combined with E- 3 He IEC cores, is estimated as high as 60%. (author)

  16. Thirty years of international nuclear standards in ISO and IEC

    International Nuclear Information System (INIS)

    Becker, K.

    1991-01-01

    Of over 4700 nuclear and radiation protection standards, laws, regulations, recommendations, etc., which have been issued by 52 countries and several governmental international organizations such as IAEA, or non-government organizations such as ICRP, ICRU, ISO and IEC, more than 90% are national, and more than half of those of a non-regulatory nature. Both number and importance of international standards are, however, increasing. The two most important non-governmental international standards organizations are the International Organization for Standardization (ISO), which founded a Technical Committee (TC) 85 'Nuclear Energy' with several Sub-Committees in 1957, and the closely associated International Electrotechnical Commission (IEC) with its TC 45 'Nuclear Instrumentation' formed in 1960. There are over 20 member countries actively participating in the work in each of them, with additional observer countries and liaison to the relevant other international organizations. A brief review is given on some of the experience which has been gained by ISO/TC 85 and IEC/TC 45, and its work program and accomplishments, considering in particular recent developments. It covers nuclear safety and instrumentation, radiation protection, and the nuclear fuel cycle, as well as interface issues including definitions and terminology, interaction of the activities with the work of other national and international bodies, etc. Some problem areas are also briefly discussed. (orig.)

  17. IEC 61850 based refurbishment strategies for protection and automation systems

    Energy Technology Data Exchange (ETDEWEB)

    Tholomier, D. [Areva T and D Automation Canada Inc., Monteal, PQ (Canada); Hossenlopp, L. [Areva T and D Automation Inc., Paris (France); Apostolov, A. [Omicron Electronics, Houston, TX (United States)

    2008-07-01

    Electric utilities are currently facing the challenge of refurbishing aging transmission networks and power system infrastructure at a time of severe economic, environmental and competitive constraints. This paper addressed the issue of an appropriate approach to retrofit the hardware and software of substation secondary systems, and how IEC standards could be used to set up a long term strategy. The first part of the paper considered an asset management strategy for refurbishing substation secondary systems, while the second part of the paper addressed the strategies for refurbishing existing power plants. The final section of the paper analyzed refurbishment strategies designed to protect power distribution systems. The impact of IEC 61850 and how legacy devices can be integrated in substation automation systems were discussed. It was concluded that new SCADA systems are needed to handle new technology. Additional features like remote control, remote settings, remote disturbance records analysis and remote maintenance are also needed to properly operate the power system. The value of preventive maintenance using remote monitoring systems to determine the status of all the digital electronic devices installed in substation was also discussed. IEC 61850 offers several opportunities to improve grid operation and control. It supports interoperability between protective relays and control devices from different manufacturers in the substation, which is required in order to achieve substation level interlocking, protection and control functions and improve the efficiency of microprocessor based relays applications. This technology has now passed the initial stage of implementation and several projects are underway worldwide. 13 figs.

  18. Direct energy conversion for IEC fusion for space applications

    Energy Technology Data Exchange (ETDEWEB)

    Momota, Hiromu; Nadler, Jon [National Inst. for Fusion Science, Toki, Gifu (Japan); Miley, George H. [Fusion Studies Laboratory, Urbana, IL (United States)

    2000-08-01

    The paper describes a concept of extracting fusion power from D-{sup 3}He fueled IEC (Inertia Electrostatic Configuration) devices. The fusion system consists of a series of fusion modules and direct energy converters at an end or at both ends. This system of multiple units is linear and is connected by a magnetic field. A pair of coils anti-parallel to the magnetic field yields a field-null domain at the center of each unit as required for IEC operation. A stabilizing coil installed between the coil pairs eliminates the strong attractive force between the anti-parallel coils. Accessible regions for charged particle trajectories are essentially isolated from the coil structure. Thus, charged particles are directed along magnetic field lines to the direct energy converter without appreciable losses. A direct energy converter unit designed to be compatible to this unique system is also described. It basically consists of a separator and a traveling wave converter. A separator separates low energy ions and electron from the 14.7 MeV fusion protons and then converts their energy into electricity. In the traveling wave direct energy converter, fusion protons are modulated to form bunches. It couples with a transmission line to couple AC power out. The overall conversion efficiency of this system, combined with E-{sup 3}He IEC cores, is estimated as high as 60%. (author)

  19. NRC valve performance test program - check valve testing

    International Nuclear Information System (INIS)

    Jeanmougin, N.M.

    1987-01-01

    The Valve Performance Test Program addresses the current requirements for testing of pressure isolation valves (PIVs) in light water reactors. Leak rate monitoring is the current method used by operating commercial power plants to survey the condition of their PIVs. ETEC testing of three check valves (4-inch, 6-inch, and 12-inch nominal diameters) indicates that leak rate testing is not a reliable method for detecting impending valve failure. Acoustic emission monitoring of check valves shows promise as a method of detecting loosened internals damage. Future efforts will focus on evaluation of acoustic emission monitoring as a technique for determining check valve condition. Three gate valves also will be tested to evaluate whether the check valve results are applicable to gate type PIVs

  20. IEC Newsletter, No. 46, Fourth Quarter 2013

    International Nuclear Information System (INIS)

    2014-02-01

    ConvEx exercises (Convention Exercises) are prepared for Member States and relevant international organizations by the IAEA under the framework of the Convention on Early Notification of a Nuclear Accident and the Convention on Assistance in the Case of a Nuclear Accident or Radiological Emergency. These exercises are carried out at three levels of complexity with the third level (ConvEx-3) being a full scale exercise prepared every three to five years within the Inter-Agency Committee on Radiological and Nuclear Emergencies (IACRNE), which comprises 17 international intergovernmental organizations. ConvEx-3 (2013), code-named 'Bab Al Maghrib', was hosted by Morocco and designed to allow Member States and international organizations to evaluate their response in a severe radiological emergency triggered by a nuclear security event and to identify emergency preparedness and response (EPR) areas requiring improvements. The exercise was conducted on 20 and 21 November 2013 and lasted approximately 25 hours. Fifty-nine Member States (including Morocco) and ten international organizations (including the IAEA) participated in the exercise. Twenty-four of the participating Member States and six of the international organizations participated in the exercise at the highest level possible (Level B) to actively test their EPR arrangements and capabilities for responding to such an event, and to test the sharing and exchange of information internationally. During the exercise, several Member States actively offered their national assistance capabilities to the exercise Accident State (Morocco). It was the first time in the history of ConvEx-3 exercises that country specific injects were prepared in a way that required specific Member State responses. The active participation of relevant international organizations (including INTERPOL and EUROPOL), information sharing, response coordination and sharing public updates among press officers of these organizations contributed to a

  1. IEC Newsletter, No. 46, Fourth Quarter 2013

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-02-15

    ConvEx exercises (Convention Exercises) are prepared for Member States and relevant international organizations by the IAEA under the framework of the Convention on Early Notification of a Nuclear Accident and the Convention on Assistance in the Case of a Nuclear Accident or Radiological Emergency. These exercises are carried out at three levels of complexity with the third level (ConvEx-3) being a full scale exercise prepared every three to five years within the Inter-Agency Committee on Radiological and Nuclear Emergencies (IACRNE), which comprises 17 international intergovernmental organizations. ConvEx-3 (2013), code-named 'Bab Al Maghrib', was hosted by Morocco and designed to allow Member States and international organizations to evaluate their response in a severe radiological emergency triggered by a nuclear security event and to identify emergency preparedness and response (EPR) areas requiring improvements. The exercise was conducted on 20 and 21 November 2013 and lasted approximately 25 hours. Fifty-nine Member States (including Morocco) and ten international organizations (including the IAEA) participated in the exercise. Twenty-four of the participating Member States and six of the international organizations participated in the exercise at the highest level possible (Level B) to actively test their EPR arrangements and capabilities for responding to such an event, and to test the sharing and exchange of information internationally. During the exercise, several Member States actively offered their national assistance capabilities to the exercise Accident State (Morocco). It was the first time in the history of ConvEx-3 exercises that country specific injects were prepared in a way that required specific Member State responses. The active participation of relevant international organizations (including INTERPOL and EUROPOL), information sharing, response coordination and sharing public updates among press officers of these organizations contributed to a

  2. Performance testing of extremity dosimeters, Study 2

    International Nuclear Information System (INIS)

    Harty, R.; Reece, W.D.; Hooker, C.D.

    1990-04-01

    The Health Physics Society Standards Committee (HPSSC) Working Group on Performance Testing of Extremity Dosimeters has issued a draft of a proposed standard for extremity dosimeters. The draft standard proposes methods to be used for testing dosimetry systems that determine occupational radiation dose to the extremities and the performance criterion used to determine compliance with the standard. Pacific Northwest Laboratory (PNL) has conducted two separate evaluations of the performance of extremity dosimeter processors to determine the appropriateness of the draft standard, as well as to obtain information regarding the performance of extremity dosimeters. Based on the information obtained during the facility visits and the results obtained from the performance testing, it was recommended that changes be made to ensure that the draft standard is appropriate for extremity dosimeters. The changes include: subdividing the mixture category and the beta particle category; eliminating the neutron category until appropriate flux-to-dose equivalent conversion factors are derived; and changing the tolerance level for the performance criterion to provide consistency with the performance criterion for whole body dosimeters, and to avoid making the draft standard overly difficult for processors of extremity dosimeters to pass. 20 refs., 10 figs., 6 tabs

  3. Development of turbopump cavitation performance test facility and the test of inducer performance

    International Nuclear Information System (INIS)

    Sohn, Dong Kee; Kim, Chun Tak; Yoon, Min Soo; Cha, Bong Jun; Kim, Jin Han; Yang, Soo Seok

    2001-01-01

    A performance test facility for turbopump inducer cavitation was developed and the inducer cavitation performance tests were performed. Major components of the performance test facility are driving unit, test section, piping, water tank, and data acquisition and control system. The maximum of testing capability of this facility are as follows: flow rate - 30kg/s; pressure - 13 bar, rotational speed - 10,000rpm. This cavitation test facility is characterized by the booster pump installed at the outlet of the pump that extends the flow rate range, and by the pressure control system that makes the line pressure down to vapor pressure. The vacuum pump is used for removing the dissolved air in the water as well as the line pressure. Performance tests were carried out and preliminary data of test model inducer were obtained. The cavitation performance test and cavitation bubble flow visualization were also made. This facility is originally designed for turbopump inducer performance test and cavitation test. However it can be applied to the pump impeller performance test in the future with little modification

  4. Testing prospect theory in students’ performance

    OpenAIRE

    Pérez Galdón, Patricia; Nicolau, Juan Luis

    2013-01-01

    This paper tests the existence of ‘reference dependence’ and ‘loss aversion’ in students’ academic performance. Accordingly, achieving a worse than expected academic performance would have a much stronger effect on students’ (dis)satisfaction than obtaining a better than expected grade. Although loss aversion is a well-established finding, some authors have demonstrated that it can be moderated – diminished, to be precise–. Within this line of research, we also examine whether the students’ e...

  5. Load responsive multilayer insulation performance testing

    International Nuclear Information System (INIS)

    Dye, S.; Kopelove, A.; Mills, G. L.

    2014-01-01

    Cryogenic insulation designed to operate at various pressures from one atmosphere to vacuum, with high thermal performance and light weight, is needed for cryogenically fueled space launch vehicles and aircraft. Multilayer insulation (MLI) performs well in a high vacuum, but the required vacuum shell for use in the atmosphere is heavy. Spray-on foam insulation (SOFI) is often used in these systems because of its light weight, but can have a higher heat flux than desired. We report on the continued development of Load Responsive Multilayer Insulation (LRMLI), an advanced thermal insulation system that uses dynamic beam discrete spacers that provide high thermal performance both in atmosphere and vacuum. LRMLI consists of layers of thermal radiation barriers separated and supported by micromolded polymer spacers. The spacers have low thermal conductance, and self-support a thin, lightweight vacuum shell that provides internal high vacuum in the insulation. The dynamic load responsive spacers compress to support the external load of a vacuum shell in one atmosphere, and decompress under reduced atmospheric pressure for lower heat leak. Structural load testing was performed on the spacers with various configurations. LRMLI was installed on a 400 liter tank and boil off testing with liquid nitrogen performed at various chamber pressures from one atmosphere to high vacuum. Testing was also performed with an MLI blanket on the outside of the LRMLI

  6. Load responsive multilayer insulation performance testing

    Energy Technology Data Exchange (ETDEWEB)

    Dye, S.; Kopelove, A. [Quest Thermal Group, 6452 Fig Street Suite A, Arvada, CO 80004 (United States); Mills, G. L. [Ball Aerospace and Technologies Corp, 1600 Commerce Street, Boulder, CO 80301 (United States)

    2014-01-29

    Cryogenic insulation designed to operate at various pressures from one atmosphere to vacuum, with high thermal performance and light weight, is needed for cryogenically fueled space launch vehicles and aircraft. Multilayer insulation (MLI) performs well in a high vacuum, but the required vacuum shell for use in the atmosphere is heavy. Spray-on foam insulation (SOFI) is often used in these systems because of its light weight, but can have a higher heat flux than desired. We report on the continued development of Load Responsive Multilayer Insulation (LRMLI), an advanced thermal insulation system that uses dynamic beam discrete spacers that provide high thermal performance both in atmosphere and vacuum. LRMLI consists of layers of thermal radiation barriers separated and supported by micromolded polymer spacers. The spacers have low thermal conductance, and self-support a thin, lightweight vacuum shell that provides internal high vacuum in the insulation. The dynamic load responsive spacers compress to support the external load of a vacuum shell in one atmosphere, and decompress under reduced atmospheric pressure for lower heat leak. Structural load testing was performed on the spacers with various configurations. LRMLI was installed on a 400 liter tank and boil off testing with liquid nitrogen performed at various chamber pressures from one atmosphere to high vacuum. Testing was also performed with an MLI blanket on the outside of the LRMLI.

  7. NetBench. Automated Network Performance Testing

    CERN Document Server

    Cadeddu, Mattia

    2016-01-01

    In order to evaluate the operation of high performance routers, CERN has developed the NetBench software to run benchmarking tests by injecting various traffic patterns and observing the network devices behaviour in real-time. The tool features a modular design with a Python based console used to inject traffic and collect the results in a database, and a web user

  8. Testing for Distortions in Performance Measures

    DEFF Research Database (Denmark)

    Sloof, Randolph; Van Praag, Mirjam

    2015-01-01

    Distorted performance measures in compensation contracts elicit suboptimal behavioral responses that may even prove to be dysfunctional (gaming). This paper applies the empirical test developed by Courty and Marschke (Review of Economics and Statistics, 90, 428-441) to detect whether the widely...

  9. Testing for Distortions in Performance Measures

    DEFF Research Database (Denmark)

    Sloof, Randolph; Van Praag, Mirjam

    Distorted performance measures in compensation contracts elicit suboptimal behavioral responses that may even prove to be dysfunctional (gaming). This paper applies the empirical test developed by Courty and Marschke (2008) to detect whether the widely used class of Residual Income based performa...

  10. Drop Performance Test of CRDMs for JRTR

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Myoung-Hwan; Cho, Yeong-Garp; Chung, Jong-Ha [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Kim, Jung-Hyun [POSCO Plandtec Co. Ltd, Ulsan (Korea, Republic of); Lee, Kwan-Hee [RIST, Pohang (Korea, Republic of)

    2015-10-15

    The drop test results of CRDMs with AC-type electromagnet show that the initial delay times are not satisfied with the requirement, 0.15 seconds. After the replacement of the electromagnet from AC-type to DCtype, the drop times of CARs and accelerations due to the impact of moving parts are satisfied with all requirements. As a result, it is found that four CRDMs to be installed at site have a good drop performance, and meet all performance requirements. A control rod drive mechanism (CRDM) is a device to control the position of a control absorber rod (CAR) in the core by using a stepping motor which is commanded by the reactor regulating system (RRS) to control the reactivity during the normal operation of the reactor. The top-mounted CRDM driven by the stepping motor for Jordan Research and Training Reactor (JRTR) has been developed in KAERI. The CRDM for JRTR has been optimized by the design improvement based on that of the HANARO. It is necessary to verify the performances such as the stepping, drop, endurance, vibration, seismic and structural integrity for active components. Especially, the CAR drop curves are important data for the safety analysis. This paper describes the test results to demonstrate the drop performances of a prototype and 4 CRDMs to be installed at site. The tests are carried out at a test rig simulating the actual reactor's conditions.

  11. SIMS Prototype System 4: performance test report

    Energy Technology Data Exchange (ETDEWEB)

    1978-10-09

    The results obtained during testing of a self-contained, preassembled air type solar system, designed for installation remote from the dwelling, to provide space heating and hot water are presented. Data analysis is included which documents the system performance and verifies the suitability of SIMS Prototype System 4 for field installation.

  12. Performance tests for integral reactor nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Sohn, Dong-Seong; Yim, Jeong-Sik; Lee, Chong-Tak; Kim, Han-Soo; Koo, Yang-Hyun; Lee, Byung-Ho; Cheon, Jin-Sik; Oh, Je-Yong

    2006-02-15

    An integral type reactor SMART plans to utilize metallic Zr-U fuel which is Zr-based alloy with 34{approx}38 wt% U. In order to verify the technologies for the design and manufacturing of the fuel and get a license, performance tests were carried out. Experimental Fuel Assembly (EFA) manufactured in KAERI is being successfully irradiated in the MIR reactor of RIAR from September 4 2004, and it has achieved burnup of 0.21 g/cc as of January 25 2006. Thermal properties of irradiated Zr-U fuel were measured. Up to the phase transformation temperature, thermal diffusivity increased linearly in proportion to temperature. However its dependence on the burnup was not significant. RIA tests with 4 unirradiated Zr-U fuel rods were performed in Kurchatov Institute to establish a safety criterion. In the case of the un-irradiated Zr-U fuel, the energy deposition during the control rod ejection accident should be less than 172 cal/g to prevent the failure accompanying fuel fragmentation and dispersal. Finally the irradiation tests of fuel rods have been performed at HANARO. The HITE-2 test was successfully completed up to a burnup of 0.31 g/cc. The HITE-3 test began in February 2004 and will be continued up to a target burnup of 0.6 g/cc.

  13. Motivation and Test Anxiety in Test Performance across Three Testing Contexts: The CAEL, CET, and GEPT

    Science.gov (United States)

    Cheng, Liying; Klinger, Don; Fox, Janna; Doe, Christine; Jin, Yan; Wu, Jessica

    2014-01-01

    This study examined test-takers' motivation, test anxiety, and test performance across a range of social and educational contexts in three high-stakes language tests: the Canadian Academic English Language (CAEL) Assessment in Canada, the College English Test (CET) in the People's Republic of China, and the General English Proficiency Test (GEPT)…

  14. MFTF test coil construction and performance

    International Nuclear Information System (INIS)

    Cornish, D.N.; Zbasnik, J.P.; Leber, R.L.; Hirzel, D.G.; Johnston, J.E.; Rosdahl, A.R.

    1978-01-01

    A solenoid coil, 105 cm inside the 167 cm outside diameter, has been constructed and tested to study the performance of the stabilized Nb--Ti conductor to be used in the Mirror Fusion Test Facility (MFTF) being built at Lawrence Livermore Laboratory. The insulation system of the test coil is identical to that envisioned for MFTF. Cold-weld joints were made in the conductor at the start and finish of each layer; heaters were fitted to some of these joints and also to the conductor at various locations in the winding. This paper gives details of the construction of the coil and the results of the tests carried out to determine its propagation and recovery characteristics

  15. IEC 61267: Feasibility of type 1100 aluminium and a copper/aluminium combination for RQA beam qualities.

    Science.gov (United States)

    Leong, David L; Rainford, Louise; Zhao, Wei; Brennan, Patrick C

    2016-01-01

    In the course of performance acceptance testing, benchmarking or quality control of X-ray imaging systems, it is sometimes necessary to harden the X-ray beam spectrum. IEC 61267 specifies materials and methods to accomplish beam hardening and, unfortunately, requires the use of 99.9% pure aluminium (Alloy 1190) for the RQA beam quality, which is expensive and difficult to obtain. Less expensive and more readily available filters, such as Alloy 1100 (99.0% pure) aluminium and copper/aluminium combinations, have been used clinically to produce RQA series without rigorous scientific investigation to support their use. In this paper, simulation and experimental methods are developed to determine the differences in beam quality using Alloy 1190 and Alloy 1100. Additional simulation investigated copper/aluminium combinations to produce RQA5 and outputs from this simulation are verified with laboratory tests using different filter samples. The results of the study demonstrate that although Alloy 1100 produces a harder beam spectrum compared to Alloy 1190, it is a reasonable substitute. A combination filter of 0.5 mm copper and 2 mm aluminium produced a spectrum closer to that of Alloy 1190 than Alloy 1100 with the added benefits of lower exposures and lower batch variability. Copyright © 2015 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  16. Hybrid Multi-Agent Control in Microgrids: Framework, Models and Implementations Based on IEC 61850

    Directory of Open Access Journals (Sweden)

    Xiaobo Dou

    2014-12-01

    Full Text Available Operation control is a vital and complex issue for microgrids. The objective of this paper is to explore the practical means of applying decentralized control by using a multi agent system in actual microgrids and devices. This paper presents a hierarchical control framework (HCF consisting of local reaction control (LRC level, local decision control (LDC level, horizontal cooperation control (HCC level and vertical cooperation control (VCC level to meet different control requirements of a microgrid. Then, a hybrid multi-agent control model (HAM is proposed to implement HCF, and the properties, functionalities and operating rules of HAM are described. Furthermore, the paper elaborates on the implementation of HAM based on the IEC 61850 Standard, and proposes some new implementation methods, such as extended information models of IEC 61850 with agent communication language and bidirectional interaction mechanism of generic object oriented substation event (GOOSE communication. A hardware design and software system are proposed and the results of simulation and laboratory tests verify the effectiveness of the proposed strategies, models and implementations.

  17. Establishing the Isotope Hydrology Laboratory in accordance with ISO/IEC 17025:2005 standard

    International Nuclear Information System (INIS)

    Nguyen Thi Hong Thinh; Ha Lan Anh; Vo Thi Anh; Dinh Thi Bich Lieu; Vo Thi Tuong Hanh

    2013-01-01

    The ISO/IEC 17025:2005 General requirements for the competence calibration laboratories is basis for the accreditation body of the country in general and VILAS in particular recognizing the competence of laboratories. With the desire to prove that we have sufficient technical , management capacity , and the ability to provide the legally recognized and technically valuable test results, the Isotope Hydrology Laboratory have developed a quality management system in accordance with ISO / IEC 17025:2005, in which the laboratory quality manual has been developed. It describes the laboratory management system , scope of activities related to quality assurance of 13 major ions and tritium content measurement services in water samples. Under quality management system, there are management and technical procedures, analysis procedures, work instructions, technical documentation, file and form system. These documents define the roles, responsibilities, powers, detailed instructions for applying and maintaining effective quality management system. Isotope Hydrology Laboratory received a certificate of accreditation issued by Bureau of Accreditation which recognized the laboratory in accordance with ISO 17025:2005 with VILAS 670 accreditation code. Scope of recognition is analyzed 14 parameters: F - , Cl - , NO 2 - , NO 3 - , Br - , PO 4 3- , SO 4 2- , Li + , Na + , NH 4 + , K + , Mg 2+ , Ca 2+ and 3 H in water by ion chromatography and liquid scintillator counting method. (author)

  18. Performance Test of CCTV in a Test Field

    Energy Technology Data Exchange (ETDEWEB)

    Seo, Hyung Min [Korea Institute of Nuclear Nonproliferation and Control, Daejeon (Korea, Republic of)

    2011-10-15

    On April 12-13, 2010, US President Obama hosted a Nuclear Security Summit in Washington, DC, to enhance international cooperation to prevent nuclear terrorism, an issue which he has identified as the most immediate and extreme threat to global security. The Summit focused on the security of nuclear materials, nonproliferation, disarmament, and peaceful nuclear energy. At the summit, the Republic of Korea was chosen as the host of the next Summit in 2012. This series of events reflects the growing global interest on 'Nuclear Security' and as the host country of the next Nuclear Summit it is the time for Korea to strengthen the physical protection regime for nuclear facilities as a first step of securing its nuclear security capability. KINAC has been operating Test field as a mean of preparing solid backup data for reviewing and revising DBT (Design Basis Threat) and to test components of the conventional physical protection system. CCTV is a key component which is used worldwide for the assessment measure of alarms. In terms of performance test of CCTV, there are several elements such as image quality, coverage and mechanical features (speed of zoom-in-out, capture, angle shift etc.). Speaking of image quality acquired by the CCTV, the quality is subject to resolution, monitor specification, camera housing, camera mounting and lightening. Thus it is clear that performance tests on image quality should consider those factors and vary the factors respectively in order to verify the influence and the interaction among those. Nevertheless due to the restrictions of the current Test field, this paper focuses on the image quality through resolution test under the various lightening conditions

  19. Eurados trial performance test for photon dosimetry

    DEFF Research Database (Denmark)

    Stadtmann, H.; Bordy, J.M.; Ambrosi, P.

    2001-01-01

    Within the framework of the EURADOS Action entitled Harmonisation and Dosimetric Quality Assurance in Individual Monitoring for External Radiation, trial performance tests for whole-body and extremity personal dosemeters were carried out. Photon, beta and neutron dosemeters were considered....... This paper summarises the results of the whole-body photon dosemeter test. Twenty-six dosimetry services from all EU Member States and Switzerland participated. Twelve different radiation fields were used to simulate various workplace irradiation fields. Dose values from 0.4 mSv to 80 mSv were chosen. From...

  20. Cytoprotective effects of essential oil of Pinus halepensis L. against aspirin-induced toxicity in IEC-6 cells.

    Science.gov (United States)

    Bouzenna, Hafsia; Hfaiedh, Najla; Bouaziz, Mouhamed; Giroux-Metges, Marie-Agnès; Elfeki, Abdelfattah; Talarmin, Hélène

    2017-12-01

    Essential oils from Pinus species have been reported to have various therapeutic properties. This study was undertaken to identify the chemical composition and cytoprotective effects of the essential oil of Pinus halepensis L. against aspirin-induced damage in cells in vitro. The cytoprotection of the oil against toxicity of aspirin on the small intestine epithelial cells IEC-6 was tested. The obtained results have shown that 35 different compounds were identified. Aspirin induced a decrease in cell viability, and exhibited significant damage to their morphology and an increase in superoxide dismutase (SOD) and catalase (CAT) activities. However, the co-treatment of aspirin with the essential oil of Pinus induced a significant increase in cell viability and a decrease in SOD and CAT activities. Overall, these finding suggest that the essential oil of Pinus halepensis L. has potent cytoprotective effect against aspirin-induced toxicity in IEC-6 cells.

  1. Testing Solutions for Adult Film Performers.

    Science.gov (United States)

    Bergman, Zachary R

    2014-01-01

    The majority of the nation's adult films are produced in California, and within California, most production occurs in Los Angeles. In order to regulate that content, the County of Los Angeles passed the Safer Sex in the Adult Film Industry Act (Measure B) by way of referendum in November 2012. Measure B requires that adult film producers wishing to film in Los Angeles County obtain permits from the Los Angeles County Department of Public Health, and it also mandates that adult film performers use condoms while filming and "engaging in anal or vaginal sexual intercourse." Nevertheless, between August 2013 and January 2014, several adult film performers in California tested positive for HIV, and the threat of infection remains. Although Measure B is not the best way forward for Los Angeles County, elements of the ordinance should be incorporated into future legislative efforts. Given the economic ramifications of industry flight due to more localized regulations, this Note concludes that California should pass statewide comprehensive reform. Any such new legislation must treat "independent contractors," the classification generally used for adult film performs, as if they were regular employees. Legislation should also couple mandatory testing mechanisms with provisions granting performers the right to choose whether they use condoms. Finally, legislation must include mechanisms that ensure performers' preferences are not improperly tainted by outside forces and pressures. While there will always be risks associated with the production of adult content, if undertaken, these reforms could significantly mitigate those hazards.

  2. Cylindrical IEC neutron source design for driven research reactor operation

    International Nuclear Information System (INIS)

    Miley, G.H.; Ulmen, B.; Amadio, G.; Leon, H.; Hora, H.

    2009-01-01

    A resurgence in nuclear power use is now underway worldwide. However, due many university research reactors shutdown, they must rely on using subcritical assemblies which employs a cylindrical Inertial Electrostatic Confinement (IEC) device to provide a fusion neutron source. The source is inserted in a fuel element position, with its power input controlled externally at a control panel. This feature opens the way to use of the critical assembly for a number of transient experiments such as sub-critical pulsing and neutron wave propagation. That in turn adds important new insights and excitement for the student teaching laboratory. (author)

  3. Performance test of 100 W linear compressor

    Energy Technology Data Exchange (ETDEWEB)

    Ko, J; Ko, D. Y.; Park, S. J.; Kim, H. B.; Hong, Y. J.; Yeom, H. K. [Korea Institute of Machinery and Materials, Daejeon(Korea, Republic of)

    2013-09-15

    In this paper, we present test results of developed 100 W class linear compressor for Stirling-type pulse tube refrigerator. The fabricated linear compressor has dual-opposed configuration, free piston and moving magnet type linear motor. Power transfer, efficiency and required pressure waveform are predicted with designed and measured specifications. In experiments, room temperature test with flow impedance is conducted to evaluate performance of developed linear compressor. Flow impedance is loaded to compressor with metering valve for flow resistance, inertance tube for flow inertance and buffer volumes for flow compliance. Several operating parameters such as input voltage, current, piston displacement and pressure wave are measured for various operating frequency and fixed input current level. Behaviors of dynamics and performance of linear compressor as varying flow impedance are discussed with measured experimental results. The developed linear compressor shows 124 W of input power, 86 % of motor efficiency and 60 % of compressor efficiency at its resonant operating condition.

  4. Performance test of a TMS calorimeter

    International Nuclear Information System (INIS)

    Wild, B.

    1986-10-01

    Performance tests of a first calorimeter module using the room temperature liquid tetramethylsilane (TMS) as active element are described in detail. As absorber planed carbon steel slabs had been used. The charge yield is 70% of that in a very pure sample of the liquid. A long term stability of the signal with a lifetime of half a year has been realized. Experiences are described and the results explained in detail. (orig.) [de

  5. RHIC Sextant Test -- Physics and performance

    International Nuclear Information System (INIS)

    Wei, J.; Fischer, W.; Ahrens, L.

    1997-01-01

    This paper presents beam physics and machine performance results of the Relativistic Heavy Ion Collider (RHIC) Sextant and AGS-to-RHIC (AtR) transfer line during the Sextant Test in early 1997. Techniques used to measure both machine properties (difference orbits, dispersion, and beamline optics) and beam parameters (energy, intensity, transverse and longitudinal emittances) are described. Good agreement was achieved between measured and design lattice optics. The gold ion beam quality was shown to approach RHIC design requirements

  6. Performance tests on the NRPB thermoluminescent dosemeter

    CERN Document Server

    Shaw, K B

    1977-01-01

    Performance tests on the thermoluminescent dosemeter, designed at NRPB for use in the automated personal dosimetry system, are described. An ultra-thin lithium borate dosemeter has been developed for skin absorbed dose measurement. The X-ray, gamma-ray and beta-ray energy response of the dosemeter has been investigated and the angular response for the dosemeter has been examined. The annealing, read-out and stabilisation procedures for the dosemeter are described.

  7. US-Japan IEC Workshop on Small Plasma and Accelerator Neutron Sources. Final report

    International Nuclear Information System (INIS)

    Miley, George H.

    2008-01-01

    The history of IEC development will be briefly described, and some speculation about future directions will be offered. The origin of IEC is due to the brilliance of Phil Farnsworth, inventor of electronic TV in the US. Early experiments were pioneered in the late 1960s by Robert Hirsch who later became head of the DOE fusion program. At that time studies of IEC physics quickly followed at the University of Illinois and at Penn State University. However, despite many successes in this early work, IEC research died as DOE funding stopped in the mid 1980s. In the early 90's, R. W. Bussard of EMC revived work with a new major project based on a magnetic assisted IEC. While doing supportive studies for that project, G. Miley proposed a grided 'STAR mode' IEC as a neutron source for NAA. This concept was later used commercially by Daimler-Benz in Germany to analysis impurities in incoming ores. This represented a first practical application of the IEC. During this period other research groups at LANL, U of Wisconsin and Kyoto University entered IEC research with innovative new concepts and approaches to IEC physics and applications. Much of this work is documented in the present and in past US-Japan Workshops. At present we stand on the threshold of a new area of IEC applications as neutron source, for isotope production, and as a plasma source. These applications provide a way to continue IEC understanding and technology development with the ultimate goal being a fusion power plant. Indeed, a distinguishing feature of the IEC vs. other fusion confinement approaches is the unique opportunity for 'spin off' applications along the way to a power producing plant.

  8. Proficiency tests for evaluation of the 99Tcm measurements in the nuclear medicine

    International Nuclear Information System (INIS)

    Iwahara, Akira; Tauhata, Luiz; Oliveira, Antonio Eduardo de; Nicoli, Ieda Gomes; Alabarse, Frederico Gil; Xavier, Ana Maria

    2009-01-01

    This work performs the performance evaluation of 55 Brazilian nuclear medicine services in activity measurement of radiopharmaceutical containing 99 Tc m . Proficiency tests based on the acceptance criteria of the Regulation ISO/IEC Guide 43-1 and on the accuracy of the brazilian Regulation CNEN-NN-3.05 were applied in 63 results of activity measurements in radionuclide calibrators used by those services. The performance services has shown that the criteria of the ISO/IEC 43-1, nevertheless to be more restrictive, presents results very consistent with the accuracy criteria requested by the Brazilian regulation

  9. The suitability of the IEC 61400-2 wind model for small wind turbines operating in the built environment★

    Directory of Open Access Journals (Sweden)

    Evans Samuel P.

    2017-01-01

    Full Text Available This paper investigates the applicability of the assumed wind fields in International Electrotechnical Commission (IEC standard 61400 Part 2, the design standard for small wind turbines, for a turbine operating in the built environment, and the effects these wind fields have on the predicted performance of a 5 kW Aerogenesis turbine using detailed aeroelastic models developed in Fatigue Aerodynamics Structures and Turbulence (FAST. Detailed wind measurements were acquired at two built environment sites: from the rooftop of a Bunnings Ltd. warehouse at Port Kennedy (PK (Perth, Australia and from the small wind turbine site at the University of Newcastle at Callaghan (Newcastle, Australia. For both sites, IEC 61400-2 underestimates the turbulence intensity for the majority of the measured wind speeds. A detailed aeroelastic model was built in FAST using the assumed wind field from IEC 61400-2 and the measured wind fields from PK and Callaghan as an input to predict key turbine performance parameters. The results of this analysis show a modest increase in the predicted mean power for the higher turbulence regimes of PK and Callaghan as well as higher variation in output power. Predicted mean rotor thrust and blade flapwise loading showed a minor increase due to higher turbulence, with mean predicted torque almost identical but with increased variations due to higher turbulence. Damage equivalent loading for the blade flapwise moment was predicted to be 58% and 11% higher for a turbine operating at Callaghan and PK respectively, when compared with IEC 61400-2 wind field. Time series plots for blade flapwise moments and power spectral density plots in the frequency domain show consistently higher blade flapwise bending moments for the Callaghan site with both the sites showing a once-per-revolution response.

  10. Heating facility for blanket and performance test

    Energy Technology Data Exchange (ETDEWEB)

    Furuya, Kazuyuki; Kuroda, Toshimasa; Enoeda, Mikio; Sato, Satoshi; Hatano, Toshihisa; Takatsu, Hideyuki; Ohara, Yoshihiro [Japan Atomic Energy Research Inst., Naka, Ibaraki (Japan). Naka Fusion Research Establishment; Hara, Shigemitsu

    1999-03-01

    A design and a fabrication of heating test facility for a mock-up of the blanket module to be installed in International Thermonuclear Experimental Reactor (ITER) have been conducted to evaluate/demonstrate its heat removal performance and structural soundness under cyclic heat loads. To simulate surface heat flux to the blanket module, infrared heating method is adopted so as to heat large surface area uniformly. The infrared heater is used in vacuum environment (10{sup -4} Torr{approx}), and the lamps are cooled by air flowing through an annulus between the lamp and a cover tube made of quartz glass. Elastomer O rings (available to be used up to {approx}300degC) and used for vacuum seal at outer surface of the cover tube. To prevent excessive heating of the O ring, the end part of the cover tube is specially designed including the tube shape, flow path of air and gold coating on the surface of the cover tube to protect the O ring against thermal radiation from glowing tungsten filament. To examine the performance of the facility, steady state and cyclic operation of the infrared heater were conducted using a small-scaled shielding blanket mock-up as a test specimen. The important results are as follows: (1) Heat flux at the surface of the small-scaled mock-up measured by a calorimeter was {approx}0.2 MW/m{sup 2}. (2) A comparison of thermal analysis results and measured temperature responses showed that the small-scaled mock-up had good heat removal performance. (3) Steady state operation and cyclic operation with step response between the rated and zero powers of the infrared heater were successfully performed, and it was confirmed that this heating facility was well-prepared and available for the thermal cyclic test of a blanket module. (author)

  11. Performance Tests for Bubble Blockage Device

    International Nuclear Information System (INIS)

    Ha, Kwang Soon; Wi, Kyung Jin; Park, Rae Joon; Wan, Han Seong

    2014-01-01

    Postulated severe core damage accidents have a high threat risk for the safety of human health and jeopardize the environment. Versatile measures have been suggested and applied to mitigate severe accidents in nuclear power plants. To improve the thermal margin for the severe accident measures in high-power reactors, engineered corium cooling systems involving boiling-induced two-phase natural circulation have been proposed for decay heat removal. A boiling-induced natural circulation flow is generated in a coolant path between a hot vessel wall and cold coolant reservoir. In general, it is possible for some bubbles to be entrained in the natural circulation loop. If some bubbles entrain in the liquid phase flow passage, flow instability may occur, that is, the natural circulation mass flow rate may be oscillated. A new device to block the entraining bubbles is proposed and verified using air-water test loop. To avoid bubbles entrained in the natural circulation flow loop, a new device was proposed and verified using an air-water test loop. The air injection and liquid circulation loop was prepared, and the tests for the bubble blockage devices were performed by varying the geometry and shape of the devices. The performance of the bubble blockage device was more effective as the area ratio of the inlet to the down-comer increased, and the device height decreased. If the device has a rim to generate a vortex zone, the bubbles will be most effectively blocked

  12. Performance testing SPECT systems: Recent developments

    International Nuclear Information System (INIS)

    Todd-Pokropek, A.

    1985-01-01

    A protocol is used to test as many currently available systems as possible, including both rotating gamma camera systems from GE, Siemens, Toshiba, Technicare, Elscint, Philips, Picker, etc, and single/multi slice system such as the Medimatic. This paper indicates changes that have occurred with respect to preliminary results previously published. Reconstructions were performed in a standard manner, using a Ramp filter and without attenuation correction, in order to reduce the effect of differences in software. The Jaszczak phantom was used to assess overall image quality. Tests were performed using the different collimators available. Image quality improved with better spatial resolution, even at the expense of sensitivity. Non-circular orbits, where available, were tested, and resolution was comparing for various positions and directions. With double headed systems, the results obtained were compared to those using a single head alone. Some gain in image quality seems to have been achieved by better uniformity resulting from improved correction circuitry, by the use of non-circular orbits, and from scatter correction. Potential still exists to improve collimator design

  13. DPM PERFORMANCE TESTING USING RASPBERRY PIS

    CERN Document Server

    Regala, M

    2013-01-01

    This is the final report from attending CERN’s Summer Student Programme. The project goal was to do performance testing on the Disk Pool Manager (DPM), a lightweight, reliable, grid-aware storage software used to store and retrieve data produced by CERN’s LHC experiments using the small, low-end ARM powered devices named Raspberry Pis. The idea behind it was to reason if it’s possible to use a cluster of lower-end, under-capable devices to run DPM, and to conclude if it would be more energy efficient than running it on oversized machines, with the same or comparable performance. If this hypothesis was true, the power-hungry machines could be ditched in favour of these small devices, leading to an enormous saving in overall power consumption and hence, overall cost. In this report, I describe what was the initial project goal and intended outcomes, proceeding to explain the underlying technologies used. Afterwards, I’ll explain the setup used, the tests performed, and the conclusions reached. iii

  14. Quality control methodology and implementation of X-radiation standards beams, mammography level, following the standard IEC 61267

    International Nuclear Information System (INIS)

    Correa, Eduardo de Lima

    2010-01-01

    In this work it was developed and applied a quality control program of the X radiation system (160 kV, constant potential, target of tungsten) of the Calibration Laboratory of IPEN(LCI) in the energy range relative to mammography beams (from 25 kV to 35 kV). The X radiation standards beams, level mammography, using molybdenum and aluminum as additional filtration, were established after the application of this quality control program following national and international recommendations. The reference ionization chamber has traceability to PTB and was regularly submitted to quality control tests for evaluation and analysis of its performance. The radiation qualities emerging from the X-radiation assembly (RQR-M), based on a phantom made up of an aluminum added filter (RQA-M), narrow beam condition (RQN-M) and broad beam condition (RQB-M), following the recommendations of the international standard IEC 61267 (2005) and the IAEA code of practice, TRS 457 (2007) were established. For the implantation of RQN-M and RQB-M radiation qualities, two mammography phantoms were developed. The half-value layers found are those presented by the German primary laboratory PTB, and varied from 0.35 to 1.21 mm Al. The air kerma rates were obtained for all the 15 implanted qualities. (author)

  15. Performance testing of a hydrogen heat pipe

    International Nuclear Information System (INIS)

    Alario, J.; Kosson, R.

    1980-01-01

    Test results are presented for a reentrant groove heat pipe with hydrogen working fluid. The heat pipe became operational between 20 and 30 K after a cooldown from 77 K without any difficulty. Steady-state performance data taken over a 19 to 23 K temperature range indicated the following: (1) maximum heat transport capacity 5.4 W-m (2) static wicking height 1.42 cm and (3) overall heat pipe conductance 1.7 W/C. These data agreed remarkably well with extrapolations made from comparable ammonia test results. The maximum heat transport capacity is 9.5% larger than the extrapolated value, but the static wicking height is the same. The overall conductance is 29% of the ammonia value, which is close to the ratio of liquid thermal conductivities (24%). Also, recovery from a completely frozen condition was accomplished within 5 min by simply applying an evaporater heat load of 1.8 W

  16. Radon detection system, design, test and performance

    International Nuclear Information System (INIS)

    Balcazar, M.; Chavez, A.; Pina-Villalpando, G.; Navarrete, M.

    1999-01-01

    A portable radon detection system (α-Inin) has been designed and constructed for using it in adverse environmental conditions where humidity, temperature and chemical vaporous are present. The minimum integration time is in periods of 15 min during 41 days. A 12 V battery and a photovoltaic module allow the α-Inin autonomy in field measurements. Data is collected by means of a laptop computer where data processing and α-Inin programming are carried out. α-Inin performance was simultaneously tested in a controlled radon chamber, together with a commercial α-Meter

  17. Performance test of wet type decontamination device

    International Nuclear Information System (INIS)

    Lee, E. P.; Kim, E. G.; Min, D. K.; Jun, Y. B.; Lee, H. K.; Seu, H. S.; Kwon, H. M.; Hong, K.P.

    2003-01-01

    The intervention area located at rear hot cell can be contaminated by hot cell maintenance work. For effective decontamination of the intervention floor a wet type decontamination device was developed. The device was assembled with a brush rotating part, a washing liquid supplying part, an intake part for recovering contaminated liquid and a device moving cart part. The device was made of stainless steel for easy decontamination and corrosion resistance. The function test carried out at intervention area of the PIE facility showed good performance

  18. Performance testing of UK personal dosimetry laboratories

    CERN Document Server

    Marshall, T O

    1985-01-01

    The proposed Ionising Radiations Regulations will require all UK personal dosimetry laboratories that monitor classified personnel to be approved for personal dosimetry by the Health and Safety Executive. It is suggested that these approvals should be based on general and supplementary criteria published by the British Calibration Service (BCS) for laboratory approval for the provision of personal dosimetry services. These criteria specify certain qualitative requirements and also indicate the need for regular tests of performance to be carried out to ensure constancy of dosimetric standards. This report concerns the latter. The status of the BCS criteria is discussed and the need for additional documents to cover new techniques and some modifications to existing documents is indicated. A means is described by which the technical performance of laboratories, concerned with personal monitoring for external radiations, can be assessed, both initially and ongoing. The costs to establish the scheme and operate it...

  19. Performance testing of UK personal dosimetry laboratories

    International Nuclear Information System (INIS)

    Marshall, T.O.

    1985-01-01

    The proposed Ionising Radiations Regulations will require all UK personal dosimetry laboratories that monitor classified personnel to be approved for personal dosimetry by the Health and Safety Executive. It is suggested that these approvals should be based on general and supplementary criteria published by the British Calibration Service (BCS) for laboratory approval for the provision of personal dosimetry services. These criteria specify certain qualitative requirements and also indicate the need for regular tests of performance to be carried out to ensure constancy of dosimetric standards. This report concerns the latter. The status of the BCS criteria is discussed and the need for additional documents to cover new techniques and some modifications to existing documents is indicated. A means is described by which the technical performance of laboratories, concerned with personal monitoring for external radiations, can be assessed, both initially and ongoing. The costs to establish the scheme and operate it are also estimated. (author)

  20. Standard specification for agencies performing nondestructive testing

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This specification covers minimum requirements for agencies performing nondestructive testing (NDT). 1.2 When using this specification to assess the capability of, or to accredit NDT agencies, Guide E 1359 shall be used as a basis for the survey. It can be supplemented as necessary with more detail in order to meet the auditor's specific needs. 1.3 This specification can be used as a basis to evaluate testing or inspection agencies, or both, and is intended for use for the qualifying or accrediting, or both, of testing or inspection agencies, public or private. 1.4 The use of SI or inch-pound units, or combination thereof, will be the responsibility of the technical committee whose standards are referred to in this standard. 1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to...

  1. Migración de un SGSI basado en ISO/IEC 27001:2005 a la versión ISO/IEC 27001:2013

    OpenAIRE

    Espol; Rendón Freire, María José

    2015-01-01

    Este proyecto tiene como objetivo identificar los cambios en los requisitos de la norma ISO/IEC 27001:2013 respecto a la versión 2005, para lograr la actualización de un sistema de gestión de seguridad de la información basado en ISO/IEC 27001:2005 acorde a lo establecido en el nuevo estándar. Guayaquil Magíster en Seguridad Informática Aplicada

  2. Proficiency tests for evaluation of the {sup 99}Tc{sup m} measurements in the nuclear medicine; Aplicacao de teste de proficiencia para avaliacao da medicao de {sup 99}Tc{sup m} na medicina nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Iwahara, Akira; Tauhata, Luiz; Oliveira, Antonio Eduardo de, E-mail: iwahara@ird.gov.b, E-mail: tauhata@ird.gov.b, E-mail: aedu@ird.gov.b [Instituto de Radioprotecao e Dosimetria (IRD/CNEN-RJ), Rio de Janeiro, RJ (Brazil); Nicoli, Ieda Gomes, E-mail: ieda@ird.gov.b [Comissao Nacional de Energia Nuclear (CNEN/DF), Brasilia, DF (Brazil). Escritorio de Brasilia; Alabarse, Frederico Gil; Xavier, Ana Maria, E-mail: falabarse@ird.gov.b, E-mail: axavier@ird.gov.b [Comissao Nacional de Energia Nuclear (ESPOA/CNEN-RS), Porto Alegre, RS (Brazil). Escritorio de Porto Alegre

    2009-07-01

    This work performs the performance evaluation of 55 Brazilian nuclear medicine services in activity measurement of radiopharmaceutical containing {sup 99}Tc{sup m}. Proficiency tests based on the acceptance criteria of the Regulation ISO/IEC Guide 43-1 and on the accuracy of the brazilian Regulation CNEN-NN-3.05 were applied in 63 results of activity measurements in radionuclide calibrators used by those services. The performance services has shown that the criteria of the ISO/IEC 43-1, nevertheless to be more restrictive, presents results very consistent with the accuracy criteria requested by the Brazilian regulation

  3. A primer on the Petri Net Markup Language and ISO/IEC 15909-2

    DEFF Research Database (Denmark)

    Hillah, L. M.; Kindler, Ekkart; Kordon, F.

    2009-01-01

    Standard, defines a transfer format for high-level nets. The transfer format defined in Part 2 of ISO/IEC 15909 is (or is based on) the \\emph{Petri Net Markup Language} (PNML), which was originally introduced as an interchange format for different kinds of Petri nets. In ISO/IEC 15909-2, however...

  4. 76 FR 22030 - Third Party Testing for Certain Children's Products; Toddler Beds: Requirements for Accreditation...

    Science.gov (United States)

    2011-04-20

    ... and content of the ILAC-MRA approach and of the requirements of the ISO/IEC 17025:2005 laboratory... to ISO Standard ISO/IEC 17025:2005, ``General Requirements for the Competence of Testing and.... The product \\1\\ was tested by a third party conformity assessment body that was ISO/IEC 17025...

  5. 75 FR 35282 - Third Party Testing for Certain Children's Products; Infant Walkers: Requirements for...

    Science.gov (United States)

    2010-06-21

    ... requirements of the ISO/IEC 17025:2005 laboratory accreditation standard is provided in the CPSC staff briefing... to ISO Standard ISO/IEC 17025:2005, ``General Requirements for the Competence of Testing and... tested by a third party conformity assessment body that was ISO/IEC 17025 accredited by an ILAC-MRA...

  6. 76 FR 49286 - Third Party Testing for Certain Children's Products; Notice of Requirements for Accreditation of...

    Science.gov (United States)

    2011-08-10

    ... history and content of the ILAC-MRA approach and of the requirements of the ISO/IEC 17025:2005 laboratory... be to ISO Standard ISO/IEC 17025:2005, ``General Requirements for the Competence of Testing and..., the product was tested by a third party conformity assessment body that was ISO/IEC 17025 accredited...

  7. Implementation of IEC standard models for power system stability studies

    Energy Technology Data Exchange (ETDEWEB)

    Margaris, Ioannis D.; Hansen, Anca D.; Soerensen, Poul [Technical Univ. of Denmark, Roskilde (Denmark). Dept. of Wind Energy; Bech, John; Andresen, Bjoern [Siemens Wind Power A/S, Brande (Denmark)

    2012-07-01

    This paper presents the implementation of the generic wind turbine generator (WTG) electrical simulation models proposed in the IEC 61400-27 standard which is currently in preparation. A general overview of the different WTG types is given while the main focus is on Type 4B WTG standard model, namely a model for a variable speed wind turbine with full scale power converter WTG including a 2-mass mechanical model. The generic models for fixed and variable speed WTGs models are suitable for fundamental frequency positive sequence response simulations during short events in the power system such as voltage dips. The general configuration of the models is presented and discussed; model implementation in the simulation software platform DIgSILENT PowerFactory is presented in order to illustrate the range of applicability of the generic models under discussion. A typical voltage dip is simulated and results from the basic electrical variables of the WTG are presented and discussed. (orig.)

  8. CFC and HFC recycling equipments: Test performances

    International Nuclear Information System (INIS)

    Picini, P.; Caropreso, G.; Cicoli, G.; Posarelli, M.

    1996-12-01

    Actual regulatory conditions about ozone layer depleting chemicals set problems on their disposal and on the management of plants still using illegal CFCs. Anyway fluids that will replace CFCs (i.e. HFCs) will not be allowed to be spread into the atmosphere, due to their high costs and to the greenhouse effect. A viable solution would be the recovery, purification and recycle of contaminated fluids. ENEA (National Agency for New Technology, Energy and the Environment), in cooperation with ICF (Industria Componenti Frigoriferi) Company leader in the field of air refrigerating and conditioning, patented a device able to extract, to clean and to recycle CFC 12 and HFC 134a in the refrigerating systems. This paper presents experimental data from the qualification tests on a device performing the above mentioned operations regarding systems that use HFC 134a as process fluid

  9. Harnessing ISO/IEC 12207 to Examine the Extent of SPI Activity in an Organisation

    Science.gov (United States)

    Clarke, Paul; O'Connor, Rory

    The quality of the software development process directly affects the quality of the software product. To be successful, software development organisations must respond to changes in technology and business circumstances, and therefore software process improvement (SPI) is required. SPI activity relates to any modification that is performed to the software process in order to improve an aspect of the process. Although multiple process assessments could be employed to examine SPI activity, they present an inefficient tool for such an examination. This paper presents an overview of a new survey-based resource that utilises the process reference model in ISO/IEC 12207 in order to expressly and directly determine the level of SPI activity in a software development organisation. This survey instrument can be used by practitioners, auditors and researchers who are interested in determining the extent of SPI activity in an organisation.

  10. Automation of an energy-autarkic manufacturing plant following IEC 61499; Automatisierung einer energieautarken Fertigungsanlage nach IEC 61499

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, Christian; Hirsch, Martin; Hanisch, Hans-Michael [Halle-Wittenberg Univ., Halle (Saale) (Germany). Lehrstuhl Automatisierungstechnik

    2009-07-01

    The requirements for future manufacturing plants are, beyond others, seamless reconfiguration, autonomy as far as possible as well as easy employment and maintenance for the end user. Within the EnAS project (Energy-Autarkic Actuators and Sensors), the group of the Automation Technology Lab in Halle has challenged the fulfillment of those requirements. Therefore, IEC 61499 compliant distributed controllers have been developed for the demonstrator-plant under particular consideration of reconfigurability. These controllers have been integrated into the process sequences of the demonstrator and afterwards several reconfiguration scenarios have been designed. The building of a Human-Machine-Interface for visualization and reconfiguration of the plant was an essential issue as well. The result is a highly flexible, easily reconfigurable system, which can be regarded as a prototype for automated manufacturing plants of a new generation. (orig.)

  11. Boxing headguard performance in punch machine tests.

    Science.gov (United States)

    McIntosh, Andrew S; Patton, Declan A

    2015-09-01

    The paper presents a novel laboratory method for assessing boxing headguard impact performance. The method is applied to examine the effects of headguards on head impact dynamics and injury risk. A linear impactor was developed, and a range of impacts was delivered to an instrumented Hybrid III head and neck system both with and without an AIBA (Association Internationale de Boxe Amateur)-approved headguard. Impacts at selected speeds between 4.1 and 8.3 m/s were undertaken. The impactor mass was approximately 4 kg and an interface comprising a semirigid 'fist' with a glove was used. The peak contact forces were in the range 1.9-5.9 kN. Differences in head impact responses between the Top Ten AIBA-approved headguard and bare headform in the lateral and forehead tests were large and/or significant. In the 8.3 m/s fist-glove impacts, the mean peak resultant headform accelerations for bare headform tests was approximately 130 g compared with approximately 85 g in the forehead impacts. In the 6.85 m/s bare headform impacts, mean peak resultant angular head accelerations were in the range of 5200-5600 rad/s(2) and almost halved by the headguard. Linear and angular accelerations in 45° forehead and 60° jaw impacts were reduced by the headguard. The data support the opinion that current AIBA headguards can play an important role in reducing the risk of concussion and superficial injury in boxing competition and training. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  12. Harmonic pulse testing for well performance monitoring

    NARCIS (Netherlands)

    Fokker, Peter A.; Salina Borello, Eloisa; Verga, Francesca; Viberti, Dario

    2018-01-01

    Harmonic testing was developed as a form of well testing that can be applied during ongoing production or injection operations, as a pulsed signal is superimposed on the background pressure trend. Thus no interruption of well and reservoir production is needed before and during the test. If the

  13. 75 FR 31688 - Third Party Testing for Certain Children's Products; Infant Bath Seats: Requirements for...

    Science.gov (United States)

    2010-06-04

    ... requirements of the ISO/IEC 17025:2005 laboratory accreditation standard is provided in the CPSC staff briefing....html . The accreditation must be to ISO Standard ISO/IEC 17025:2005, ``General Requirements for the... tested by a third party conformity assessment body that was ISO/IEC 17025 accredited by an ILAC-MRA...

  14. 75 FR 42311 - Third Party Testing for Certain Children's Products; Vinyl Plastic Film: Requirements for...

    Science.gov (United States)

    2010-07-21

    ... ISO/IEC 17025:2005 laboratory accreditation standard is provided in the CPSC staff briefing memorandum....org/membersbycategory.html . The accreditation must be to ISO Standard ISO/IEC 17025:2005, ``General... conformity assessment body that was ISO/IEC 17025 accredited by an ILAC-MRA member at the time of the test...

  15. 75 FR 51016 - Third Party Testing for Certain Children's Products; Clothing Textiles: Requirements for...

    Science.gov (United States)

    2010-08-18

    ... (ISO)/International Electrotechnical Commission (IEC) Standard 17025:2005, ``General Requirements for... and of the requirements of the ISO/IEC 17025:2005 laboratory accreditation standard is provided in the... must be to ISO Standard ISO/IEC 17025:2005, ``General Requirements for the Competence of Testing and...

  16. 76 FR 18645 - Third Party Testing for Certain Children's Products; Notice of Requirements for Accreditation of...

    Science.gov (United States)

    2011-04-05

    ... to the International Standards Organization (ISO)/International Electrotechnical Commission (IEC) Standard ISO/IEC 17025:2005, ``General Requirements for the Competence of Testing and Calibration... paint ban and 16 CFR part 1303, it must be accredited to ISO/IEC 17025- 2005 by an accreditation body...

  17. Spent fuel metal storage cask performance testing and future spent fuel concrete module performance testing

    International Nuclear Information System (INIS)

    McKinnon, M.A.; Creer, J.M.

    1988-10-01

    REA-2023 Gesellshaft fur Nuklear Service (GNS) CASTOR-V/21, Transnuclear TN-24P, and Westinghouse MC-10 metal storage casks, have been performance tested under the guidance of the Pacific Northwest Laboratory to determine their thermal and shielding performance. The REA-2023 cask was tested under Department of Energy (DOE) sponsorship at General Electric's facilities in Morris, Illinois, using BWR spent fuel from the Cooper Reactor. The other three casks were tested under a cooperative agreement between Virginia Power Company and DOE at the Idaho National Engineering Laboratory (INEL) by EGandG Idaho, Inc., using intact spent PWR fuel from the Surry reactors. The Electric Power Research Institute (EPRI) made contributions to both programs. A summary of the various cask designs and the results of the performance tests is presented. The cask designs include: solid and liquid neutron shields; lead, steel, and nodular cast iron gamma shields; stainless steel, aluminum, and copper baskets; and borated materials for criticality control. 4 refs., 8 figs., 6 tabs

  18. Can non-regulators audit Independent Ethic Committees (IEC), and if so, how?

    Science.gov (United States)

    Dent, N J; Sweatman, W J

    A number of guidelines and directives have reinforced the need for a more formalised approach to Independent Ethic Committees (IECs) and support the need to audit IECs. The key elements of an audit of an IEC are reviewed within the context of the European Guidelines for Auditing Independent Ethics Committees published by the European Forum for Good Clinical Practice (EFGCP). Auditing requirements in these recent guidelines and the EU Clinical Trial Directive are discussed as well as the methodology and type of documentation and SOPs that should be present at an audit. It is argued that both inspectorates and independent auditors need to conduct such audits to improve the overall global standard.

  19. Establishment Of Physicochemical Laboratory Of CANTI In Conformity With The Requirements Of ISO/IEC 17025:2005

    International Nuclear Information System (INIS)

    Pham Thi Hoang Ha; Phan Thi Luan; Le Thi Thanh Tam; Huynh Thai Kim Ngan; Duong Thi Bich Chi; Vo Thi Ngoc Cam; Ho Tran The Huu; Vo Thi Cuong; Tram Thi Khanh Quynh; Tran Tri Hai; To Ba Cuong

    2013-01-01

    23 testing methods have been established, compiled and issued in standard forms throughout the Project implementation. Besides, the Laboratory QA/QC system have been set up and put into operation from 01/09/2011. The Laboratory was assessed on 12-13/9/2012 by Bureau of Accreditation, Ministry of Science and Technology and has been certified to conform with the requirements of ISO/IEC 17025:2005 with the accreditation number VILAS 609 in pursuant to the Decision No. 365.2012/QD-VPCNCL dated on 20/12/2012. (author)

  20. Gloss uniformity measurement update for ISO/IEC 19751

    Science.gov (United States)

    Ng, Yee S.; Cui, Chengwu; Kuo, Chunghui; Maggard, Eric; Mashtare, Dale; Morris, Peter

    2005-01-01

    To address the standardization issues of perceptually based image quality for printing systems, ISO/IEC JTC1/SC28, the standardization committee for office equipment chartered the W1.1 project with the responsibility of drafting a proposal for an international standard for the evaluation of printed image quality1. An ISO draft Standard2, ISO/WD 19751-1, Office Equipment - Appearance-based image quality standards for printers - Part 1: Overview, Procedure and Common Methods, 2004 describes the overview of this multi-part appearance-based image quality standard. One of the ISO 19751 multi-part Standard"s tasks is to address the appearance-based gloss and gloss uniformity issues (in ISO 19751-2). This paper summarizes the current status and technical progress since the last two updates3, 4. In particular, we will be discussion our attempt to include 75 degree gloss (G75) objective measurement5 in differential gloss and within-page gloss uniformity. The result for a round-robin experiment involving objective measurement of differential gloss using G60 and G75 gloss measurement geometry is described. The results for two perceptual-based round-robin experiments relating to haze effect on the perception of gloss, and gloss artifacts (gloss streaks/bands, gloss graininess/mottle) are discussed.

  1. Test plan for dig-face characterization performance testing

    International Nuclear Information System (INIS)

    Josten, N.E.

    1993-09-01

    The dig-face characterization concept has been under development at the Idaho National Engineering Laboratory (INEL) since FY 1992 through the support of the Buried Waste Integrated Demonstration Program. A Dig-face Characterization System conducts continuous subsurface characterization simultaneously with retrieval of hazardous and radioactive waste from buried waste sites. The system deploys multiple sensors at the retrieval operation dig-face and collects data that provide a basis for detecting, locating, and identifying hazardous conditions before they are disturbed by the retrieval equipment. This test plan describes initial efforts to test the dig-face characterization concept at the INEL Cold Test Pit using a simplified prototype apparatus and off-the-shelf sensors. The Cold Test Pit is a simulated waste site containing hazardous and radioactive waste surrogates at known locations. Testing will be directed toward three generic characterization problems: metal detection, plume detection, and radioactive source detection. The prototype apparatus will gather data using magnetometers, a ground conductivity meter, a trace gas analyzer, and a gamma ray sensor during simulated retrieval of the surrogate waste materials. The data acquired by a dig-face characterization system are unique because of the high precision, high data density, and multiple viewpoints attainable through the dig-face deployment approach. The test plan establishes procedures for collecting and validating a representative dig-face characterization data set. Analysis of these data will focus on developing criteria for predicting the depth, location, composition, and other characteristics of the surrogate waste materials. If successful, this proof-of-concept exercise will provide a foundation for future development of a fully-operational system that is capable of operating on an actual waste site

  2. Proof of Performance Test Report MANTIS

    National Research Council Canada - National Science Library

    2005-01-01

    ... (NVESD), Humanitarian Demining Branch (HD), the assessment was conducted by HD staff members and supported by engineers from the United Kingdom under the auspices of the International Evaluation Test Program for Humanitarian Demining (ITEP...

  3. The relationship between standardised test performance and ...

    African Journals Online (AJOL)

    The English language proficiency of South African learners is integral to ... in standardised reading/writing tests in English Second Language (ESL) and (2) the use of ... and their relationship with the ESL learner's language learning strategies.

  4. Accelerated Performance Testing on the 2006 NCAT Pavement Test Track

    Science.gov (United States)

    2009-12-01

    The original National Center for Asphalt Technology (NCAT) Pavement Test Track was built in 2000 in Opelika, Alabama where it has served as a state-of-the-art, full-scale, closed-loop accelerated loading facility. The construction, operation, and res...

  5. Auto-Mapping and Configuration Method of IEC 61850 Information Model Based on OPC UA

    Directory of Open Access Journals (Sweden)

    In-Jae Shin

    2016-11-01

    Full Text Available The open-platform communication (OPC unified architecture (UA (IEC62541 is introduced as a key technology for realizing a variety of smart grid (SG use cases enabling relevant automation and control tasks. The OPC UA can expand interoperability between power systems. The top-level SG management platform needs independent middleware to transparently manage the power information technology (IT systems, including the IEC 61850. To expand interoperability between the power system for a large number of stakeholders and various standards, this paper focuses on the IEC 61850 for the digital substation. In this paper, we propose the interconnection method to integrate communication with OPC UA and convert OPC UA AddressSpace using system configuration description language (SCL of IEC 61850. We implemented the mapping process for the verification of the interconnection method. The interconnection method in this paper can expand interoperability between power systems for OPC UA integration for various data structures in the smart grid.

  6. Review and Outlook of China Electronic and IT Industry Footprints in IEC International Standardization Activities

    Institute of Scientific and Technical Information of China (English)

    Hu Jingping

    2006-01-01

    @@ Year 2006 is the year marking the 100th anniversary of the founding of International Electrotechnical Commission (IEC). IEC is mainly engaged in the international standardization for electrical and electronic technology field aiming at promoting international trade and technology cooperation and exchange, improving product and service quality, upgrading productivity and protecting the environment as well as human health and safety. Most countries worldwide adopt standards developed and promulgated by IEC, providing a platform to international trade and technical exchange. China has being a member since 1957. Electronic and IT are the most developed and energetic filed in recent decades. Number of IEC TC/SC specialized in electronic and IT amounts up to 52.

  7. Nuclear material control and accountancy planning and performance testing

    International Nuclear Information System (INIS)

    Mike Enhinger; Dennis Wilkey; Rod Martin; Ken Byers; Brian Smith

    1999-01-01

    An overview of performance testing as used at U.S. Department of Energy facilities is provided. Performance tests are performed on specific aspects of the regulations or site policy. The key issues in establishing a performance testing program are: identifying what needs to be tested; determining how to test; establishing criteria to evaluate test results. The program elements of performance testing program consist of: planning; coordination; conduct; evaluation. A performance test may be conducted of personnel or equipment. The DOE orders for nuclear material control and accountancy are divided into three functional areas: program administration, material accounting, and material control. Examples performance tests may be conducted on program administration, accounting, measurement and measurement control, inventory, and containment [ru

  8. Plan de implementación de la ISO/IEC 27001:2013

    OpenAIRE

    Gorriti Aranguren, Iñaki

    2015-01-01

    En el desarrollo del proyecto se analizaron las directrices establecidas en la norma ISO/IEC 27001:2013, que especifica los requisitos necesarios para establecer, implantar, mantener y mejorar un SGSI mediante un proceso de mejora continua. In the development there were analyzed the directives established in the norm ISO/IEC27001:2013, which specifies the necessary requirements to establish, to implement, to support and to improve a SGSI by means of a process of constant improvement. En...

  9. Phase 1: ISOCELL demonstration test performance review

    International Nuclear Information System (INIS)

    Chatwin, T.D.

    1991-04-01

    This document consolidates and organizes information available concerning cryogenic retrieval of hazardous, radioactive, and mixed wastes and is mainly derived from a report on the ISOCELL Demonstration Project prepared by Concept RKK, Ltd. ISOCELL cryogenic technology is designed to immobilize hazardous, radioactive, and mixed waste by creating a block of frozen waste and soil that can be safely retrieved, stored, transported, and treated with a minimum of dust. A test of the ISOCELL process was conducted in Carnation, Washington by Concept RKK, Ltd. Test conditions were compared to possible testing conditions at Idaho National Engineering Laboratory. Results indicate ISOCELL technology successfully froze wet soil into a soil block capable of being lifted. 5 refs., 6 figs., 1 tab

  10. Comparison of performance test for protective aprons

    International Nuclear Information System (INIS)

    Fukutomi, Yukimi; Yoshimoto, Masahiro; Kawakami, Toshiaki

    1989-01-01

    Each one radioprotective apron (lead equivalent, 0.35 mmPb) was commercially available in November 1988 from 7 domestic and 3 foreign companies. According to the JIS standards 4803, these aprons were evaluated for the following items: 1) display of aprons, including packing and the structure; 2) non-breaking test, including appearance, size, lead equivalent, and uniformity; 3) breaking test, including lead equivalent, uniformity, stregth, and structure; 4) feeling of wearing an apron. An overall evaluation revealed that only two aprons were in accordance with the JIS standard. Careful wearing of the protective apron is stressed. (N.K.)

  11. 10 CFR 26.168 - Blind performance testing.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Blind performance testing. 26.168 Section 26.168 Energy... and Human Services § 26.168 Blind performance testing. (a) Each licensee and other entity shall submit blind performance test samples to the HHS-certified laboratory. (1) During the initial 90-day period of...

  12. IGF-IEc expression is increased in secondary compared to primary foci in neuroendocrine neoplasms.

    Science.gov (United States)

    Alexandraki, Krystallenia I; Philippou, Anastassios; Boutzios, Georgios; Theohari, Irini; Koutsilieris, Michael; Delladetsima, Ioanna Kassiani; Kaltsas, Gregory A

    2017-10-03

    Different Insulin-like growth factor-I (IGF-I) mRNA transcripts are produced by alternative splicing and particularly the IGF-IEc isoform has been implicated in the development and/or progression of various types of cancer. In the present study, we examined the potential role of IGF-IEc expression as a new immunohistochemical marker of aggressiveness in neuroendocrine neoplasms (NENs). We utilized immunohistochemical analysis in tissue specimens of 47 patients with NENs, to evaluate the expression of IGF-IEc (%) and Ki-67 proliferation index (%). Specimens from patients with tumors of different tissue origin, of either primary or metastatic lesions and of different grade were examined. Cytoplasmic IGF-IEc staining was found in 23 specimens of NENs or NECs: 10 pancreatic, 4 small bowel, 3 gastric, 1 lung, 1 uterine and 4 poorly differentiated of unknown primary origin. Ki-67 and IGF-IEc expression was positively correlated in all the samples studied (r=0.31, p=0.03). IGF-1Ec expression was more prevalent in specimens originating from metastatic foci with high Ki-67 compared to primary sites with low Ki-67 expression (p=0.036). These findings suggest a possible role of IGF-IEc in NEN tumorigenesis and progression to metastases that could be used as an additional new marker of a more aggressive behavior and a potential drugable target.

  13. GPS Device Testing Based on User Performance Metrics

    Science.gov (United States)

    2015-10-02

    1. Rationale for a Test Program Based on User Performance Metrics ; 2. Roberson and Associates Test Program ; 3. Status of, and Revisions to, the Roberson and Associates Test Program ; 4. Comparison of Roberson and DOT/Volpe Programs

  14. 75 FR 70911 - Third Party Testing for Certain Children's Products; Children's Sleepwear, Sizes 0 Through 6X and...

    Science.gov (United States)

    2010-11-19

    ... ISO/IEC 17025:2005, General Requirements for the Competence of Testing and Calibration Laboratories... requirements of the ISO[sol]IEC 17025:2005 laboratory accreditation standard is provided in the CPSC staff...]IEC 17025 accredited by an ILAC-MRA signatory and the scope of the accreditation included the...

  15. 75 FR 52616 - Third Party Testing for Certain Children's Products; Youth All-Terrain Vehicles: Requirements for...

    Science.gov (United States)

    2010-08-27

    ... content of the ILAC-MRA approach and of the requirements of the ISO/IEC 17025:2005 laboratory... must be to ISO Standard ISO/IEC 17025:2005, General Requirements for the Competence of Testing and... that at that time was ISO/IEC 17025 accredited by an ILAC-MRA signatory. For firewalled conformity...

  16. 75 FR 51020 - Third Party Testing for Certain Children's Products; Mattresses, Mattress Pads, and/or Mattress...

    Science.gov (United States)

    2010-08-18

    ... Standardization (ISO)/International Electrotechnical Commission (IEC) Standard 17025:2005, ``General Requirements... and of the requirements of the ISO/IEC 17025:2005 laboratory accreditation standard is provided in the... body that was ISO/IEC 17025 accredited by an ILAC-MRA member at the time of the test. For firewalled...

  17. Factors affecting the auction price of Veldram performance tested ...

    African Journals Online (AJOL)

    The popularity of these auctions for performance tested rams (89.4 % of rams sold) indicate that Veld tested rams were sought after by buyers. The sale price of 296 Veld tested Dorper rams sold between 1994 and 2001, covering seven different tests, were compared with their measured and observed performances.

  18. SIMS prototype system 4 - performance test report

    Science.gov (United States)

    1978-01-01

    A self-contained, preassembled air type solar system, designed for installation remote from the dwelling, to provide space heating and hot water was evaluated. Data analysis is included which documents the system performance and verifies its suitability for field installation.

  19. IEC Information Bulletin, No. 44, Second Quarter 2013

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-09-15

    The latest publication in the IAEA Emergency Preparedness and Response (EPR)-series, Actions to Protect the Public in an Emergency due to Severe Conditions at a Light Water Reactor (EPR-NPP PUBLIC PROTECTIVE ACTIONS, 2013), was issued in May 2013. It is intended for those responsible for making and for acting on decisions in the event of an emergency involving actual or projected severe damage to the fuel in the reactor core or in the spent fuel pool of a light water reactor, to provide an understanding of the actions necessary to protect the public. It provides a basis for developing the tools and criteria at the preparedness stage that would be needed to take appropriate protective actions and other actions in response to an emergency. It provides guidance on: - Taking actions to protect the public based on conditions at the nuclear power plant using an emergency classification system; - Assessing environmental monitoring measurements taken after a release of radioactive material to determine if protective actions are needed; and - How to place the radiological health hazard in perspective for the public and answer key questions, such as ''Am I safe?'' and ''What do I need to do to protect myself and family?'' The publication is currently only available in English, but will soon be available in Spanish and Russian. The associated training materials will be available from the IAEA's and the Incident and Emergency Centre's websites later this year, and are also planned to be translated into other official UN languages. In addition, the IEC offers workshops on this publication at the national, regional and inter regional levels when requested by a Member State.

  20. IEC Information Bulletin, No. 44, Second Quarter 2013

    International Nuclear Information System (INIS)

    2013-09-01

    The latest publication in the IAEA Emergency Preparedness and Response (EPR)-series, Actions to Protect the Public in an Emergency due to Severe Conditions at a Light Water Reactor (EPR-NPP PUBLIC PROTECTIVE ACTIONS, 2013), was issued in May 2013. It is intended for those responsible for making and for acting on decisions in the event of an emergency involving actual or projected severe damage to the fuel in the reactor core or in the spent fuel pool of a light water reactor, to provide an understanding of the actions necessary to protect the public. It provides a basis for developing the tools and criteria at the preparedness stage that would be needed to take appropriate protective actions and other actions in response to an emergency. It provides guidance on: - Taking actions to protect the public based on conditions at the nuclear power plant using an emergency classification system; - Assessing environmental monitoring measurements taken after a release of radioactive material to determine if protective actions are needed; and - How to place the radiological health hazard in perspective for the public and answer key questions, such as ''Am I safe?'' and ''What do I need to do to protect myself and family?'' The publication is currently only available in English, but will soon be available in Spanish and Russian. The associated training materials will be available from the IAEA's and the Incident and Emergency Centre's websites later this year, and are also planned to be translated into other official UN languages. In addition, the IEC offers workshops on this publication at the national, regional and inter regional levels when requested by a Member State

  1. IEC Information Bulletin, No. 45, Third Quarter 2013

    International Nuclear Information System (INIS)

    2013-12-01

    On Tuesday 17 September 2013, on the second day of the IAEA 57th General Conference, the Incident and Emergency Centre (IEC) organized a side event entitled Assessment and Prognosis during a Nuclear Power Plant Accident. This event provided an opportunity for the Secretariat to present to Member States the work that has been undertaken to achieve the requirements of the new IAEA expanded mandate during a nuclear emergency. The expanded mandate of the IAEA's role during a nuclear emergency is in line with a specific request from the IAEA Action Plan on Nuclear Safety, unanimously endorsed by IAEA Member States in 2011. The Action Plan requires the IAEA Secretariat to provide Member States, international organizations and the general public with timely, clear, factually correct, objective and easily understandable information during a nuclear emergency on its potential consequences, including analysis of available information and prognosis of possible scenarios based on evidence, scientific knowledge and the capabilities of Member States.' For the last two years, the IAEA Secretariat, in cooperation with Member States and International Organizations, has been developing a comprehensive process to provide assessment and prognosis during a nuclear emergency. Specific details on the actions that were taken in the last 24 months by the Secretariat was presented. The current direction and future path were also discussed, including the importance of having significant cooperation and collaboration with Member States to achieve and maintain a truly robust process for assessment and prognosis during any type of nuclear emergency. The presentation also included the description of challenges, such as the need for availability of technical information and clear communication of any uncertainties. Finally, the potential use of the IAEA Response and Assistance Network (RANET) in this process, as appropriate, was explained. The discussions demonstrated the importance of the

  2. IEC Information Bulletin, No. 45, Third Quarter 2013

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-12-15

    On Tuesday 17 September 2013, on the second day of the IAEA 57th General Conference, the Incident and Emergency Centre (IEC) organized a side event entitled Assessment and Prognosis during a Nuclear Power Plant Accident. This event provided an opportunity for the Secretariat to present to Member States the work that has been undertaken to achieve the requirements of the new IAEA expanded mandate during a nuclear emergency. The expanded mandate of the IAEA's role during a nuclear emergency is in line with a specific request from the IAEA Action Plan on Nuclear Safety, unanimously endorsed by IAEA Member States in 2011. The Action Plan requires the IAEA Secretariat to provide Member States, international organizations and the general public with timely, clear, factually correct, objective and easily understandable information during a nuclear emergency on its potential consequences, including analysis of available information and prognosis of possible scenarios based on evidence, scientific knowledge and the capabilities of Member States.' For the last two years, the IAEA Secretariat, in cooperation with Member States and International Organizations, has been developing a comprehensive process to provide assessment and prognosis during a nuclear emergency. Specific details on the actions that were taken in the last 24 months by the Secretariat was presented. The current direction and future path were also discussed, including the importance of having significant cooperation and collaboration with Member States to achieve and maintain a truly robust process for assessment and prognosis during any type of nuclear emergency. The presentation also included the description of challenges, such as the need for availability of technical information and clear communication of any uncertainties. Finally, the potential use of the IAEA Response and Assistance Network (RANET) in this process, as appropriate, was explained. The discussions demonstrated the importance of the

  3. On the Implementation of the IEC 61850 Standard: Will Different Manufacturer Devices Behave Similarly under Identical Conditions?

    Directory of Open Access Journals (Sweden)

    Mohamad El Hariri

    2016-12-01

    Full Text Available Standardization in smart grid communications is necessary to facilitate complex operations of modern power system functions. However, the strong coupling between the cyber and physical domains of the contemporary grid exposes the system to vulnerabilities and thus places more burden on standards’ developers. As such, standards need to be continuously assessed for reliability and are expected to be implemented properly on field devices. However, the actual implementation of common standards varies between vendors, which may lead to different behaviors of the devices even if present under similar conditions. The work in this paper tested the implementation of the International Electro-technical Commission’s Generic Object Oriented Substation Event GOOSE (IEC 61850 GOOSE messaging protocol on commercial Intelligent Electronic Devices (IEDs and the open source libiec61850 library—also used in commercial devices—which showed different behaviors in identical situations. Based on the test results and analysis of some features of the IEC 61850 GOOSE protocol itself, this paper proposes guidelines and recommendations for proper implementation of the standard functionalities.

  4. Drop performance test and evaluation for HANARO shutoff units

    International Nuclear Information System (INIS)

    Jung, Y. H.; Cho, Y. K.; Lee, J. H.; Choi, Y. S.; Woo, J. S.

    2004-01-01

    The function of the shutoff units of the HANARO is to rapidly insert the shutoff rod into the reactor core for safe shutdown of reactor. This paper describes drop performance test and evaluation for a shutoff unit for the technical verification of lifetime extension and localization of the HANARO shutoff units. We have performed preliminary drop performance tests for a shutoff unit at 1/2-core test loop and analyzed through the comparison with the test results performed during design verification test and the results of the periodic performance test in HANARO. It shows that the results of the local fabrication, installation and alignment for the shutoff unit meet the basic performance requirements, Furthermore, the performance evaluation method of the periodic drop test of the HANARO shutoff units is a conservative method comparing with the real drop time

  5. Consistent integrated automation. Optimized power plant control by means of IEC 61850; Durchgaengig automatisieren. Optimierte Kraftwerksleittechnik durch die Norm IEC 61850

    Energy Technology Data Exchange (ETDEWEB)

    Orth, J. [ABB AG, Mannheim (Germany). Geschaeftsbereich Power Generation

    2007-07-01

    Today's power plants are highly automated. All subsystems of large thermal power plants can be controlled from a central control room. The electrical systems are an important part. In future the new standard IEC 61850 will improve the integration of electrical systems into automation of power plants supporting the reduction of operation and maintenance cost. (orig.)

  6. Adopting ISO 9712:2005 and ISO/IEC 17024:2003 as Philippine national standard for NDT for global competitiveness

    International Nuclear Information System (INIS)

    Banaga, Renato T.; Mateo, Alejandro J.

    2005-01-01

    This paper describes and promotes the adoption of ISO 9712: 2005 edition and the ISO/IEC 17024: 2003 edition by the Philippines to be globally competitive. ISO 9712 is a standard for qualifications and certification of nondestructive testing (NDT) personnel while ISO/IEC 17024 is conformity assessment-general requirements for bodies operating certification of persons. ISO 9712 defies that the effectiveness of an application of nondestructive testing depends on the capabilities and qualifications of personnel performing the NDT test. The Philippines through the national certifying body (NCB) implements the certification of proficiency of NDT personnel in accordance with the Philippine National Standards (PNS-146: 1998) This standard (formerly PNS-146: 1987) was originally based from the draft ISO/TC-135/SC7N35.3 and was later revised to conform to the latest ISO FDIS 9712: 1997 and rename PNS-146: 1998. Now with the issuance of the latest ISO 9712:2005 edition and to keep abreast with the current trends of NDT technology, present time and conditions dictates for us to revise our NDT personnel certification to the latest edition of ISO 9712. The International Atomic Energy Agency (IAEA) supports the establishment of a common NDT standard. The IAEA is promoting af financially supporting the establishment in developing countries of only one NDT standard. The IAEA through the Regional Cooperative Agreement (RCA) has initiated the harmonization of the NDT qualification and certification of personnel in the RCA member states. In October 2001, the IAEA sponsored the Dhaka meeting where the International Committee for Nondestructive Testing (ICNDT), Asia-Pacific Committee (APCNDT) and RCA member states representatives drafted a Mutual Recognition Agreement (MRA) for the Asia-Pacific NDT (APCNDT) personnel certification schemes acording to ISO 9712. Last August 2005, IAEA/RCA sponsored the Colombo meeting for the harmonization of regional NDT applying ISO 9712 and ISO/IEC

  7. Performance-based containment leakage testing

    International Nuclear Information System (INIS)

    Cybulskis, P.

    1995-01-01

    The U.S. Nuclear Regulatory Commission (NRC) is reviewing regulatory requirements in an effort to revise those that are marginal to safety but impose significant burdens on licensees. Identification of requirements marginal to safety and development and evaluation of alternatives utilize the NRC safety goals and insights from probabilistic risk assessments (PRAs). Since earlier studies found design-basis containment leakage to be a minor contributor to reactor accident risk, containment leakage testing has been selected as a candidate for change in regulations. This paper summarizes the technical analyses supporting the NRC proposal to amend Appendix J of 10 CFR Part 50 as its first effort to decrease unnecessary regulatory burdens on licensees

  8. Experimental test of liquid droplet radiator performance

    Science.gov (United States)

    Mattick, A. T.; Simon, M. A.

    The liquid droplet radiator (LDR) is a heat rejection system for space power systems wherein an array of heated liquid droplets radiates energy directly to space. The use of submillimeter droplets provides large radiating area-to-mass ratio, resulting in radiator systems which are several times lighter than conventional solid surface radiators. An experiment is described in which the power radiated by an array of 2300 streams of silicone oil droplets is measured to test a previously developed theory of the LDR radiation process. This system would be capable of rejecting several kW of heat in space. Furthermore, it would be suitable as a modular unit of an LDR designed for 100-kW power levels. The experiment provided confirmation of the theoretical dependence of droplet array emissivity on optical depth. It also demonstrated the ability to create an array of more than 1000 droplet streams having a divergence less than 1 degree.

  9. Efficient IEC permanent-magnet motor (3 kW) - Final report; Effizienter IEC Permanent-Magnet-Motor (3 kW) - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Lindegger, M. [Circle Motor AG, Guemligen (Switzerland); Biner, H. P.; Evequoz, B. [Haute Ecole valaisanne, Sion (Switzerland); Salathe, D. [Hochschule Luzern, Technik und Architektur, Horw (Switzerland)

    2008-04-15

    Efficient permanent-magnet motors achieve in the area up to 100 kW a higher efficiency than induction machines (standard motors). A simple and fast energy saving option is the exchange of inefficient standard motors. The objective of this work is to install a 3 kW permanent-magnet motor in a standard IEC housing and the optimization of the design for high efficiency. Another objective is the development and the realization of an efficient variable speed control. The efficiency of the motor and the inverter with the control system must be demonstrated by tests. These tasks have been split between Circle Motor AG and the universities of applied sciences of Valais and Lucerne. Considering high-efficiency and low manufacturing cost, a brushless DC solution was adopted. This resulted in an optimum design of the motor and the control system realized with a three-phase rectifier, a buck converter with variable DC voltage, and a three-phase inverter feeding full positive and negative current to two of the legs simultaneously. The maximum measured efficiency is about 96.5% for the inverter and 92% for the motor. With the advantage of the variable speed operation, the efficiency of the realized 3 kW permanent magnet motor together with the control system is always higher than the efficiency of a measured class EFF1 induction motor, even with a direct connection to the grid. The permanent-magnet motor is also about 10 kg lighter. The cost calculation shows that the permanent-magnet motor can be competitive with the induction motor when speed control is desired. This is also the domain with the largest potential for energy savings from variable speed pumps, compressors, fans. (author)

  10. Stirling convertor performance mapping test results

    Science.gov (United States)

    Qiu, Songgang; Peterson, Allen A.; White, Maurice A.; Faultersack, Franklyn; Redinger, Darin L.; Petersen, Stephen L.

    2002-01-01

    The Department of Energy (DOE) has selected Free-Piston Stirling Convertors as a technology for future advanced radioisotope space power systems. In August 2000, DOE awarded competitive Phase I, Stirling Radioisotope Generator (SRG) power system integration contracts to three major aerospace contractors, resulting in SRG conceptual designs in February 2001. All three contractors based their designs on the Technology Demonstration Convertor (TDC) developed by Stirling Technology Company (STC) for DOE. The contract award to a single system integration contractor for Phases II and III of the SRG program is anticipated in late 2001. The first potential SRG mission is targeted for a Mars rover. Recent TDC performance data are provided in this paper, together with predictions from Stirling simulation models. .

  11. New test methods for BIPV. Results from IP performance

    International Nuclear Information System (INIS)

    Jol, J.C.; Van Kampen, B.J.M.; De Boer, B.J.; Reil, F.; Geyer, D.

    2009-11-01

    Within the Performance project new test procedures for PV building products and the building performance as a whole when PV is applied in buildings have been drafted. It has resulted in a first draft of new test procedures for PV building products and proposals for tests for novel BIPV technology like thin film. The test proposed are a module breakage test for BIPV products, a fire safety test for BIPV products and a dynamic load test for BIPV products. Furthermore first proposals of how flexible PV modules could be tested in an appropriate way to ensure long time quality and safety of these new products are presented.

  12. Experimental test of liquid droplet radiator performance

    International Nuclear Information System (INIS)

    Mattick, A.T.; Simon, M.A.

    1986-01-01

    This liquid droplet radiator (LDR) is evolving rapidly as a lightweight system for heat rejection in space power systems. By using recirculating free streams of submillimeter droplets to radiate waste energy directly to space, the LDR can potentially be an order of magnitude lighter than conventional radiator systems which radiate from solid surfaces. The LDR is also less vulnerable to micrometeoroid damage than are conventional radiators, and it has a low transport volume. Three major development issues of this new heat rejection system are the ability to direct the droplet streams with sufficient precision to avoid fluid loss, radiative performance of the array of droplet streams which comprise the radiating elements of the LDR, and the efficacy of the droplet stream collector, again with respect to fluid loss. This paper reports experimental results bearing on the first two issues - droplet aiming in a multikilowatt-sized system, and radiated power from a large droplet array. Parallel efforts on droplet collection and LDR system design are being pursued by several research groups

  13. Answering the request for emergency assistance worldwide. The Incident and Emergency Centre (IEC)

    International Nuclear Information System (INIS)

    2007-01-01

    In 2005, the IAEA announced the establishment of a fully integrated Incident and Emergency Centre (IEC). The functions of the IEC include coordinating prompt assistance to requesting States in the case of a nuclear security incident. As the global focal point for international preparedness, communication and response to nuclear and radiological incidents or emergencies irrespective of their cause, the IEC stands at the centre of coordinating effective and efficient activities worldwide. The IEC's work includes the evaluation of emergency plans and assistance in their development. The Centre also develops accident classifications based on plant conditions and supports effective communication between neighbouring countries. In addition, it develops various response procedures and facilitates national exercises on response to reactor emergencies. This includes training a broad range of IAEA staff to respond to emergencies as well as training of external experts. Response to incidents and emergencies can involve the exchange of information, provision of advice and/or the coordination of field response. In order to coordinate a global response, the IEC hosts a Response Assistance Network (RANET) under which Member States, Parties to the Emergency Conventions and relevant international organizations are able to register their response capabilities. This network aims to facilitate assistance in case of a nuclear or radiological incident or emergency in a timely and effective manner. An important component of the global emergency response system is the notification and reporting arrangements and systems operated by the IEC. The IEC operates systems that are reliable and secure. Member States, Non-Member States and international organizations have historically reported events and requests for assistance to the IAEA through the ENATOM arrangements using the ENAC web site, phone or fax. Under these arrangements, States have nominated Competent Authorities and National Warning

  14. Fenestration System Performance Research, Testing, and Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Jim Benney

    2009-11-30

    The US DOE was and is instrumental to NFRC's beginning and its continued success. The 2005 to 2009 funding enables NFRC to continue expanding and create new, improved ratings procedures. Research funded by the US DOE enables increased fenestration energy rating accuracy. International harmonization efforts supported by the US DOE allow the US to be the global leader in fenestration energy ratings. Many other governments are working with the NFRC to share its experience and knowledge toward development of their own national fenestration rating process similar to the NFRC's. The broad and diverse membership composition of NFRC allows anyone with a fenestration interest to come forward with an idea or improvement to the entire fenestration community for consideration. The NFRC looks forward to the next several years of growth while remaining the nation's resource for fair, accurate, and credible fenestration product energy ratings. NFRC continues to improve its rating system by considering new research, methodologies, and expanding to include new fenestration products. Currently, NFRC is working towards attachment energy ratings. Attachments are blinds, shades, awnings, and overhangs. Attachments may enable a building to achieve significant energy savings. An NFRC rating will enable fair competition, a basis for code references, and a new ENERGY STAR product category. NFRC also is developing rating methods to consider non specular glazing such as fritted glass. Commercial applications frequently use fritted glazing, but no rating method exists. NFRC is testing new software that may enable this new rating and contribute further to energy conservation. Around the world, many nations are seeking new energy conservation methods and NFRC is poised to harmonize its rating system assisting these nations to better manage and conserve energy in buildings by using NFRC rated and labeled fenestration products. As this report has shown, much more work needs to be

  15. Reliability performance testing of totally encapsulating chemical protective suits

    International Nuclear Information System (INIS)

    Johnson, J.S.; Swearengen, P.M.

    1991-01-01

    The need to assure a high degree of reliability for totally encapsulating chemical protective (TECP) suits has been recognized by Lawrence Livermore National Laboratory's (LLNL) Hazards Control Department for some time. The following four tests were proposed as necessary to provide complete evaluation of TECP suit performance: 1. Quantitative leak test (ASTM draft), 2. Worst-case chemical exposure test (conceptual), 3. Pressure leak-rate test (complete, ASTM F1057-87), and 4. Chemical leak-rate test (ASTM draft). This paper reports on these tests which should be applied to measuring TECP suit performance in two stages: design qualification tests and field use tests. Test 1, 2, and 3 are used as design qualification tests, and tests 3 and 4 are used as field use tests

  16. 75 FR 81789 - Third Party Testing for Certain Children's Products; Full-Size Baby Cribs and Non-Full-Size Baby...

    Science.gov (United States)

    2010-12-28

    ... Standardization (ISO)/International Electrotechnical Commission (IEC) Standard 17025:2005, ``General Requirements... and of the requirements of the ISO/IEC 17025:2005 laboratory accreditation standard is provided in the... accreditation must be to ISO Standard ISO/IEC 17025:2005, ``General Requirements for the Competence of Testing...

  17. Comparison of EMI/RFI requirements to qualify the equipment for nuclear power plant. (RG 1.180, EPRI TR 102323, IEC 62003 and GB/T 11684)

    Energy Technology Data Exchange (ETDEWEB)

    Jang, Tae Heon [Korea Testing Laboratory, Ansan (Korea, Republic of); Kim, Jong Seog [Research Institute of Korea Electric Power Corporation, Daejeon (Korea, Republic of); Seo, Jeong Ho; Cho, Kyoung Youn [Korea Electric Association, Seoul (Korea, Republic of)

    2011-05-15

    One issue that has been problematic for new plant equipment and especially for digital instrumentation and control (I and C) systems in recent years is electromagnetic compatibility (EMC). In some reports for nuclear power plant (NPP), electromagnetic interference (EMI), radio frequency interference (RFI), and power surges have been identified as environmental conditions that can affect the performance of safety-related electrical equipment. There are mainly two reference guides for applying to qualify EMI/RFI requirements of the equipment used in a NPP: US NRC RG 1.180 and EPRI TR 102323. Recently, IEC published the standard for the equipment in the NPP, IEC 62003. This paper has compared the requirements of these, including comparing of the requirement of the Chinese national standard, GB/T 11684

  18. Comparison of EMI/RFI requirements to qualify the equipment for nuclear power plant. (RG 1.180, EPRI TR 102323, IEC 62003 and GB/T 11684)

    International Nuclear Information System (INIS)

    Jang, Tae Heon; Kim, Jong Seog; Seo, Jeong Ho; Cho, Kyoung Youn

    2011-01-01

    One issue that has been problematic for new plant equipment and especially for digital instrumentation and control (I and C) systems in recent years is electromagnetic compatibility (EMC). In some reports for nuclear power plant (NPP), electromagnetic interference (EMI), radio frequency interference (RFI), and power surges have been identified as environmental conditions that can affect the performance of safety-related electrical equipment. There are mainly two reference guides for applying to qualify EMI/RFI requirements of the equipment used in a NPP: US NRC RG 1.180 and EPRI TR 102323. Recently, IEC published the standard for the equipment in the NPP, IEC 62003. This paper has compared the requirements of these, including comparing of the requirement of the Chinese national standard, GB/T 11684

  19. A quality assurance system for personal monitoring in Ireland: experience to date and transition from EN 45001 to ISO/IEC 17025

    International Nuclear Information System (INIS)

    Currivan, L.; Spain, D.; Rafferty, B.

    2002-01-01

    Up to 2000 the RPII was the competent authority for approval of dosimetry services operating within Ireland. However the transposition into Irish Law of Council Directive 96/29 Euratom in May 2000 means that dosimetry services operating in Ireland must now attain accreditation to the standard of EN-45001 or its equivalent. To comply with this new legislation the RPII sought accreditation for the Dosimetry Service from the Irish National Accreditation Board (NAB). In accordance with the EN-45000 series of European Standards and the relevant ISO guides NAB tests accuracy of results and accredits organisations as appropriate. In September 2000 accreditation was granted to the Dosimetry Service for individual monitoring of personnel who are occupationally exposed to ionising radiation. The scope of the accreditation covers the evaluation of personal doses, for photon and beta, using TLD. Frequent internal quality audits, together with periodic inter-laboratory test programmes, ensure that these quality standards are maintained. This accreditation fulfils the approval under legislation for dosimetry services. The new standard, ISO/IEC 17025, was introduced by ISO (the International Organization for Standardization) and IEC (the International Electrotechnical Commission) in 1999. This standard was introduced in Ireland by NAB and will be implemented for future assessments. The aim of this paper is to describe the quality system currently operated by the RPII's Dosimetry Service, our practical experience to date, and to outline the transition from EN-45001 to ISO/IEC 17025

  20. Freeze-thaw performance testing of whole concrete railroad ties.

    Science.gov (United States)

    2013-10-01

    Freezing and thawing durability tests of prestressed concrete ties are normally performed according to ASTM C666 specifications. Small specimens are cut from the shoulders of concrete ties and tested through 300 cycles of freezing and thawing. Saw-cu...

  1. Vertical Integration in factories using OPC-UA and IEC-61499

    Directory of Open Access Journals (Sweden)

    Marcelo V. García

    2017-02-01

    Full Text Available Nowadays, factory automation systems need to cope with very different challenges, such as big data, IIoT, etc. These challenges lead to a new generation of automation systems based on the so-called Cyber-Physical Production Systems (CPPS globally connected to form a flexible System of Cyber-Physical Production Systems (SoCPPS. CPPSs require acquisition of production system data and smart data processing to extract information to improve the overall system performance. To achieve that it is needed to bridge the gap between the control systems and higher layers. This paper discusses an approach to use the IEC 61499 function block concept to exchange data between plant floor and higher layers using an industrial standard like OPC UA. The OPC UA server offers subscription mechanisms, making possible the integration of several resources residing at plant floor. As it runs on embedded devices, the proposal makes possible to acquire plant information at low cost, enabling at the same time, a component-based design for enterprise plant floor control with independence of the hardware platform used

  2. Using the IEC standard to describe low-background detectors -- What can you expect?

    International Nuclear Information System (INIS)

    Keyser, R.M.; Wagner, S.

    1998-01-01

    Many measurements for environmental levels of the radioactive content require that the gamma-ray detector be low background, that is, free of any radioactive content. This is, of course, not possible, but the radioactivity in the detector must be reduced to as low a value as possible. The description or specification of the background spectrum necessary to achieve the desired results is needed. The new International Electrotechnical Commission (IEC) standard for describing the background makes the specification of the background in a high-purity germanium (HPGe) detector simple, unambiguous, and related to how the detector will be used. Users and manufacturers will finally be speaking the same language on this subject. Because this standard extends the specification of the performance of an HPGe detector, there is little history available for comparison and thus no means of determining a good value. To develop a history, the background spectrum for 500 low-background HPGe ORTEC detectors were all counted in similar low-background shields. These detectors were in a variety of mechanical cryostat and endcap configurations. The continuum background is a function of energy and detector size/configuration. The peak area for the peak energies listed in the standard is a function of detector size and configuration. The results thus give practical guidance for obtaining the most appropriate low-background detector for a specific measurement problem

  3. Using the IEC Standard to Describe Low-Background Detectors-What Can You Expect?

    International Nuclear Information System (INIS)

    Ronald M. Keyser; Sanford Wagner

    1998-01-01

    The new International Electrotechnical Commission (IEC) standard for describing the background makes the specification of the background in a high-purity germanium (HPGe) detector simple, unambiguous, and related to how the detector will be used. Users and manufacturers will finally be speaking the same language on this subject. Because this standard extends the specification of the performance of an HPGe detector, there is little history available for comparison and thus no means of determining a ''good'' value. To develop a history, the background spectrum for 500 low-background HPGe ORTEC detectors were all counted in similar low-background shields. These detectors were in a variety of mechanical cryostat and endcap configurations. The continuum background is a function of energy and detector size/configuration. The peak area for the peak energies listed in the standard is a function of detector size and configuration. The results thus give practical guidance for obtaining the most appropriate low-background detector for a specific measurement problem

  4. Qualification test on class 1E charger and inverter in nuclear power plant

    International Nuclear Information System (INIS)

    Li Mingcheng; Lin Jian; Fu Mingxing; Xu Benfu; Ma Peifeng

    2014-01-01

    The qualification approach for class lE electrical equipment was introduced, based on IEC, IEEE and RCC-E standards and technical documents. Combined with a lot of practical experience, the qualification scheme for class lE charger and inverter was developed. The component evaluation, performance and stress test, EMC test, seismic test and software qualification for the equipment were analyzed in detail. (authors)

  5. 40 CFR 63.2354 - What performance tests, design evaluations, and performance evaluations must I conduct?

    Science.gov (United States)

    2010-07-01

    ... evaluations, and performance evaluations must I conduct? 63.2354 Section 63.2354 Protection of Environment... tests, design evaluations, and performance evaluations must I conduct? (a)(1) For each performance test... procedures specified in subpart SS of this part. (3) For each performance evaluation of a continuous emission...

  6. Jefferson Lab IEC 61508/61511 Safety PLC Based Safety System

    International Nuclear Information System (INIS)

    Mahoney, Kelly; Robertson, Henry

    2009-01-01

    This paper describes the design of the new 12 GeV Upgrade Personnel Safety System (PSS) at the Thomas Jefferson National Accelerator Facility (TJNAF). The new PSS design is based on the implementation of systems designed to meet international standards IEC61508 and IEC 61511 for programmable safety systems. In order to meet the IEC standards, TJNAF engineers evaluated several SIL 3 Safety PLCs before deciding on an optimal architecture. In addition to hardware considerations, software quality standards and practices must also be considered. Finally, we will discuss R and D that may lead to both high safety reliability and high machine availability that may be applicable to future accelerators such as the ILC.

  7. Competence Requirements of ISO/IEC Standards for Information Security Professionals

    Directory of Open Access Journals (Sweden)

    Natalia G. Miloslavskaya

    2017-11-01

    Full Text Available The rapid progress in the filed of information security (IS puts one in a need of periodic revision of professional competencies (formulated in the federal state educational standards –FSESs and working functions (formulated in the professional standards – PSs. Under these conditions, a timely reaction to everything new that emerges or will appear in modern regulatory documents (primarily in standards is extremely important. We make a forecast for the content of the ISO/IEC 27021 and ISO/IEC 19896 standards drafted by the International Organization for Standardization (ISO, which should contain the requirements for the competencies of IS management system professionals and the competence of IS testers and evaluators. Our forecast takes into account the requirements of the ISO/IEC 27000 standard group and the recommendations of the European e-Competence Framework e-CF 3.0.

  8. 40 CFR 63.309 - Performance tests and procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Performance tests and procedures. 63.309 Section 63.309 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Standards for Coke Oven Batteries § 63.309 Performance tests and procedures. (a) Except as otherwise...

  9. Beam test performance of the SKIROC2 ASIC

    CERN Document Server

    Frisson, T; Anduze, M; Augustin, J.E; Bonis, J; Boudry, V; Bourgeois, C; Brient, J.C; Callier, S; Cerutti, M; Chen, S; Cornat, R; Cornebise, P; Cuisy, D; David, J; De la Taille, C; Dulucq, F; Frotin, M; Gastaldi, F; Ghislain, P; Giraud, J; Gonnin, A; Grondin, D; Guliyev, E; Hostachy, J.Y; Jeans, D; Kamiya, Y; Kawagoe, K; Kozakai, C; Lacour, D; Lavergne, L; Lee, S.H; Magniette, F; Ono, H; Poeschl, R; Rouëné, J; Seguin-Moreau, N; Song, H.S; Sudo, Y; Thiebault, A; Tran, H; Ueno, H; Van der Kolk, N; Yoshioka, T

    2015-01-01

    Beam tests of the first layers of CALICE silicon tungsten ECAL technological prototype were performed in April and July 2012 using 1–6 GeV electron beam at DESY. This paper presents an analysis of the SKIROC2 readout ASIC performance under test beam conditions.

  10. Towards Smart Buildings Performance Testing as a Service

    DEFF Research Database (Denmark)

    Markoska, Elena; Lazarova-Molnar, Sanja

    2018-01-01

    to buildings’ energy consumption. In this paper we propose a methodology for continuous performance testing of smart buildings as a service. We discuss the automatic discovery and instantiation of performance tests, as well as usage of results for discovery of potential faults and ways to improve buldings...

  11. Impact of Educational Level on Performance on Auditory Processing Tests.

    Science.gov (United States)

    Murphy, Cristina F B; Rabelo, Camila M; Silagi, Marcela L; Mansur, Letícia L; Schochat, Eliane

    2016-01-01

    Research has demonstrated that a higher level of education is associated with better performance on cognitive tests among middle-aged and elderly people. However, the effects of education on auditory processing skills have not yet been evaluated. Previous demonstrations of sensory-cognitive interactions in the aging process indicate the potential importance of this topic. Therefore, the primary purpose of this study was to investigate the performance of middle-aged and elderly people with different levels of formal education on auditory processing tests. A total of 177 adults with no evidence of cognitive, psychological or neurological conditions took part in the research. The participants completed a series of auditory assessments, including dichotic digit, frequency pattern and speech-in-noise tests. A working memory test was also performed to investigate the extent to which auditory processing and cognitive performance were associated. The results demonstrated positive but weak correlations between years of schooling and performance on all of the tests applied. The factor "years of schooling" was also one of the best predictors of frequency pattern and speech-in-noise test performance. Additionally, performance on the working memory, frequency pattern and dichotic digit tests was also correlated, suggesting that the influence of educational level on auditory processing performance might be associated with the cognitive demand of the auditory processing tests rather than auditory sensory aspects itself. Longitudinal research is required to investigate the causal relationship between educational level and auditory processing skills.

  12. Reliability Evaluation of Concentrator Photovoltaic Modules per IEC Qualification Specifications

    Energy Technology Data Exchange (ETDEWEB)

    Tamizhmani, Govindasamy

    2012-12-05

    This project is related to the qualification testing of new generation CPV (concentrator photovoltaics) modules at lower testing costs and lower turnaround time. In this project, the first testing program was completed for two CPV manufacturers, the second testing program was completed for two manufacturers at 65% of the actual testing cost and at less than 3 months of testing turnaround time and the third testing program was completed for two manufacturers at 65% of the actual testing cost and at less than 3 months of testing turnaround time. Due to their financial situation and restructuring, Amonix (one of the CPV manufacturers) intermittently terminated the test programs.

  13. DEVELOPING an ENGLISH PERFORMANCE TEST for INCOMING INDONESIAN COLLEGE STUDENTS

    Directory of Open Access Journals (Sweden)

    Bill Glenny Wullur

    2011-07-01

    Full Text Available Abstracts This study constructed, developed and validated an English Performance test as a complementary to an existing placement test in Universitas Klabat, Manado, Indonesia.  It is designed to provide a valid criterion-based measurement within the placement programs of the said university. The study aimed to answer the following questions: (1 What test tasks and items are needed in a performance test based on current language testing theory? (2 Is the performance test valid? (3 Is the scoring of the performance test reliable? (4 Is the performance test practical and predictive? And (5 What are the ratings of the resultant performance test? The steps in developing a performance test involved conducting needs analysis, establishing attributes of good performance test, and constructing test specification based on current language testing theory.  The speech event chosen which would generate language use was applying for financial assistance.  From this speech event, four activities were elicited: (1 writing a letter of inquiry, (2 completing an application form, (3 making an appointment for interview, (4 giving an oral presentation/interview.  These activities represent the four authentic tasks in which the desirable modes/channel of communication, language functions and skills, genre, and topic are integrated. The developed test is divided into four sections corresponding with the elicited tasks: (1 Formal letter, (2 Application form, (3 Making Appointment, and (4 Oral Presentation. The test was validated in several ways: (1 face validation compared the scores of Indonesian studying in the Philippines and in Indonesia, and found that the scores are highly correlated at Spearman ρ = .85.  (2 The content validation relied on the evaluation of expert informants.  The finding shows that the content coverage and relevance of the test is highly satisfactory. (3 The concurrent validation was conducted to the existing placement test and found

  14. The influence of shyness on children's test performance.

    Science.gov (United States)

    Crozier, W Ray; Hostettler, Kirsten

    2003-09-01

    Research has shown that shy children differ from their peers not only in their use of language in routine social encounters but also in formal assessments of their language development, including psychometric tests of vocabulary. There has been little examination of factors contributing to these individual differences. To investigate cognitive-competence and social anxiety interpretations of differences in children's performance on tests of vocabulary. To examine the performance of shy and less shy children under different conditions of test administration, individually with an examiner or among their peers within the familiar classroom setting. The sample consisted of 240 Year 5 pupils (122 male, 118 female) from 24 primary schools. Shy and less shy children, identified by teacher nomination and checklist ratings, completed vocabulary and mental arithmetic tests in one of three conditions, in a between-subjects design. The conditions varied individual and group administration, and oral and written responses. The conditions of test administration influenced the vocabulary test performance of shy children. They performed significantly more poorly than their peers in the two face-to-face conditions but not in the group test condition. A comparable trend for the arithmetic test was not statistically significant. Across the sample as a whole, shyness correlated significantly with test scores. Shyness does influence children's cognitive test performance and its impact is larger when children are tested face-to-face rather than in a more anonymous group setting. The results are of significance for theories of shyness and have implications for the assessment of schoolchildren.

  15. Photovoltaic Module Qualification Plus Testing

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Sarah [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wohlgemuth, John [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kempe, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bosco, Nick [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hacke, Peter [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jordan, Dirk [National Renewable Energy Lab. (NREL), Golden, CO (United States); Miller, David C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Silverman, Timothy J. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Phillips, Nancy [3M Company, Maplewood, MN (United States); Earnest, Thomas [DuPont, Wilmington, DE (United States); Romero, Ralph [Black & Veatch, Overland Park, KS (United States)

    2013-12-01

    This report summarizes a set of test methods that are in the midst of being incorporated into IEC 61215 for certification of a module design or other tests that go beyond certification to establish bankability.

  16. Performance testing framework for smart grid communication network

    International Nuclear Information System (INIS)

    Quang, D N; See, O H; Chee, L L; Xuen, C Y; Karuppiah, S

    2013-01-01

    Smart grid communication network is comprised of different communication mediums and technologies. Performance evaluation is one of the main concerns in smart grid communication system. In any smart grid communication implementation, to determine the performance factor of the network, a testing of an end-to-end process flow is required. Therefore, an effective and coordinated testing procedure plays a crucial role in evaluating the performance of smart grid communications. In this paper, a testing framework is proposed as a guideline to analyze and assess the performance of smart grid communication network.

  17. Modelling of plug and play interface for energy router based on IEC61850

    Science.gov (United States)

    Shi, Y. F.; Yang, F.; Gan, L.; He, H. L.

    2017-11-01

    Under the background of the “Internet Plus”, as the energy internet infrastructure equipment, energy router will be widely developed. The IEC61850 standard is the only universal standard in the field of power system automation which realizes the standardization of engineering operation of intelligent substation. To eliminate the lack of International unified standard for communication of energy router, this paper proposes to apply IEC61850 to plug and play interface and establishes the plug and play interface information model and information transfer services. This paper provides a research approach for the establishment of energy router communication standards, and promotes the development of energy router.

  18. Timed Online Tests: Do Students Perform Better with More Time?

    Science.gov (United States)

    Portolese, Laura; Krause, Jackie; Bonner, Julie

    2016-01-01

    This article focuses on timed tests and specifically on whether increased time enhances test performance. Three courses during the Winter 2015 term (quizzes n = 573) and three courses over the Spring 2015 term (quizzes n = 600) comprised this sample. Students were given the same tests, but the experimental group (Spring 2015) was given 50% more…

  19. Cognitive Fatigue Influences Students’ Performance on Standardized Tests

    DEFF Research Database (Denmark)

    Sievertsen, Hans Henrik; Gino, Francesca; Piovesan, Marco

    2016-01-01

    /10 and 2012/13, we find that, for every hour later in the day, test scores decrease by 0.9% of an SD. In addition, a 20- to 30-minute break improves average test scores. Time of day affects students’ test performance because, over the course of a regular day, students’ mental resources get taxed. Thus...

  20. Item Response Theory Models for Performance Decline during Testing

    Science.gov (United States)

    Jin, Kuan-Yu; Wang, Wen-Chung

    2014-01-01

    Sometimes, test-takers may not be able to attempt all items to the best of their ability (with full effort) due to personal factors (e.g., low motivation) or testing conditions (e.g., time limit), resulting in poor performances on certain items, especially those located toward the end of a test. Standard item response theory (IRT) models fail to…

  1. Perancangan SMKI Berdasarkan SNI ISO/IEC27001:2013 dan SNI ISO/IEC27005:2013 (Studi Kasus DPTSI-ITS

    Directory of Open Access Journals (Sweden)

    Furqon Mauladani

    2018-03-01

    Full Text Available Institut Teknologi Sepuluh Nopember (ITS adalah salah satu universitas di Surabaya. ITS telah menggunakan TIK untuk keperluan operasional bisnisnya (contohnya isi kartu program studi, proses absensi, pembaharuan informasi, dan lainnya. Penggunaan TIK tidak dapat dipisahkan dari ancaman yang dapat mengganggu operasional TIK. Ancaman terdiri dari ancaman yang berasal dari luar (penyebaran malware, aktifitas social engineering, orang dalam (sengaja, tidak sengaja, kegagalan teknis (kesalahan penggunaan, kegagalan perangkat keras/lunak ataupun bencana alam (kebakaran, gempa, banjir. Metode yang digunakan pada penelitian ini adalah melakukan manajemen resiko keamanan informasi berdasarkan SNI ISO/IEC 27005 dan perancangan dokumen SMKI berdasarkan SNI ISO/IEC 27001. Hasil penelitian ini adalah 60 resiko yang tidak diterima dari total 228 resiko yang telah teridentifikasi. Dari 60 resiko tersebut, terdapat 58 risk modification, 1 risk avoidance, dan 1 risk sharing. Tata kelola keamanan informasi yang dirancang berdasarkan SNI ISO/IEC 27001 adalah ruang lingkup SMKI, kebijakan SMKI, proses penilaian resiko, proses penanganan resiko, statement of applicability, dan sasaran keamanan informasi.

  2. High Performance Computing Modernization Program Kerberos Throughput Test Report

    Science.gov (United States)

    2017-10-26

    Naval Research Laboratory Washington, DC 20375-5320 NRL/MR/5524--17-9751 High Performance Computing Modernization Program Kerberos Throughput Test ...NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 2. REPORT TYPE1. REPORT DATE (DD-MM-YYYY) 4. TITLE AND SUBTITLE 6. AUTHOR(S) 8. PERFORMING...PAGE 18. NUMBER OF PAGES 17. LIMITATION OF ABSTRACT High Performance Computing Modernization Program Kerberos Throughput Test Report Daniel G. Gdula* and

  3. Irradiation test and performance evaluation of DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Song, K. C.; Moon, J. S.

    2002-05-01

    The objective of the project is to establish the performance evaluation system of DUPIC fuel during the Phase II R and D. In order to fulfil this objectives, irradiation test of DUPIC fuel was carried out in HANARO using the non-instrumented and SPND-instrumented rig. Also, the analysis on the in-reactor behavior analysis of DUPIC fuel, out-pile test using simulated DUPIC fuel as well as performance and integrity assessment in a commercial reactor were performed during this Phase. The R and D results of the Phase II are summarized as follows : - Performance evaluation of DUPIC fuel via irradiation test in HANARO - Post irradiation examination of irradiated fuel and performance analysis - Development of DUPIC fuel performance code (modified ELESTRES) considering material properties of DUPIC fuel - Irradiation behavior and integrity assessment under the design power envelope of DUPIC fuel - Foundamental technology development of thermal/mechanical performance evaluation using ANSYS (FEM package)

  4. Model tests on dynamic performance of RC shear walls

    International Nuclear Information System (INIS)

    Nagashima, Toshio; Shibata, Akenori; Inoue, Norio; Muroi, Kazuo.

    1991-01-01

    For the inelastic dynamic response analysis of a reactor building subjected to earthquakes, it is essentially important to properly evaluate its restoring force characteristics under dynamic loading condition and its damping performance. Reinforced concrete shear walls are the main structural members of a reactor building, and dominate its seismic behavior. In order to obtain the basic information on the dynamic restoring force characteristics and damping performance of shear walls, the dynamic test using a large shaking table, static displacement control test and the pseudo-dynamic test on the models of a shear wall were conducted. In the dynamic test, four specimens were tested on a large shaking table. In the static test, four specimens were tested, and in the pseudo-dynamic test, three specimens were tested. These tests are outlined. The results of these tests were compared, placing emphasis on the restoring force characteristics and damping performance of the RC wall models. The strength was higher in the dynamic test models than in the static test models mainly due to the effect of loading rate. (K.I.)

  5. The Performance test of Mechanical Sodium Pump with Water Environment

    International Nuclear Information System (INIS)

    Cho, Chungho; Kim, Jong-Man; Ko, Yung Joo; Jeong, Ji-Young; Kim, Jong-Bum; Ko, Bock Seong; Park, Sang Jun; Lee, Yoon Sang

    2015-01-01

    As contrasted with PWR(Pressurized light Water Reactor) using water as a coolant, sodium is used as a coolant in SFR because of its low melting temperature, high thermal conductivity, the high boiling temperature allowing the reactors to operate at ambient pressure, and low neutron absorption cross section which is required to achieve a high neutron flux. But, sodium is violently reactive with water or oxygen like the other alkali metal. So Very strict requirements are demanded to design and fabricate of sodium experimental facilities. Furthermore, performance testing in high temperature sodium environments is more expensive and time consuming and need an extra precautions because operating and maintaining of sodium experimental facilities are very difficult. The present paper describes performance test results of mechanical sodium pump with water which has been performed with some design changes using water test facility in SAM JIN Industrial Co. To compare the hydraulic characteristic of model pump with water and sodium, the performance test of model pump were performed using vender's experimental facility for mechanical sodium pump. To accommodate non-uniform thermal expansion and to secure the operability and the safety, the gap size of some parts of original model pump was modified. Performance tests of modified mechanical sodium pump with water were successfully performed. Water is therefore often selected as a surrogate test fluid because it is not only cheap, easily available and easy to handle but also its important hydraulic properties (density and kinematic viscosity) are very similar to that of the sodium. Normal practice to thoroughly test a design or component before applied or installed in reactor is important to ensure the safety and operability in the sodium-cooled fast reactor (SFR). So, in order to estimate the hydraulic behavior of the PHTS pump of DSFR (600 MWe Demonstraion SFR), the performance tests of the model pump such as performance

  6. The Empirical Testing of a Musical Performance Assessment Paradigm

    Science.gov (United States)

    Russell, Brian E.

    2010-01-01

    The purpose of this study was to test a hypothesized model of aurally perceived performer-controlled musical factors that influence assessments of performance quality. Previous research studies on musical performance constructs, musical achievement, musical expression, and scale construction were examined to identify the factors that influence…

  7. Mechanical/structural performance test method of a spacer grid

    International Nuclear Information System (INIS)

    Yoon, Kyung Ho

    2000-06-01

    The spacer grid is one of the main structural components in the fuel assembly, which supports the fuel rods, guides cooling water, and protects the system from an external impact load, such as earthquakes. In order to develop the spacer grid with the high mechanical performance, the mechanical and structural properties of the spacer grids must be extensively examined while designing it. In this report, the mechanical/structural test methods, i.e. the characteristic test of a spacer grid spring or dimple, static buckling test of a partial or full size spacer grid and dynamic impact test of them are described. The characteristic test of a spacer grid spring or dimple is accomplished with universal tensile test machine, a specimen is fixed with test fixture and then applied compressive load. The characteristic test data is saved at loading and unloading event. The static buckling test of a partial or full size spacer grid is executed with the same universal tensile testing machine, a specimen is fixed between cross-heads and then applied the compressive load. The buckling strength is decided the maximum strength at load vs. displacement curve. The dynamic impact test of a partial or full size spacer grid is performed with pendulum type impact machine and free fall shock test machine, a specimen is fixed with test fixture and then applied the impact load by impact hammer. Specially, the pendulum type impact test machine is also possible under the operating temperature because a furnace is separately attached with test machine

  8. Important Details in Performing and Interpreting the Scratch Collapse Test.

    Science.gov (United States)

    Kahn, Lorna C; Yee, Andrew; Mackinnon, Susan E

    2018-02-01

    The utility of the scratch collapse test has been demonstrated in examination of patients with carpal and cubital tunnel syndromes and long thoracic and peroneal nerve compressions. In the authors' clinic, this lesser known test plays a key role in peripheral nerve examination where localization of the nerve irritation or injury is not fully understood. Test utility and accuracy in patients with more challenging presentations likely correlate with tester understanding and experience. This article offers a clear outline of all stages of the test to improve interrater reliability. The nuances of test performance are described, including a description of situations where the scratch collapse test is deemed inappropriate. Four clinical scenarios where the scratch collapse test may be useful are included. Corresponding video content is provided to improve performance and interpretation of the scratch collapse test. Diagnostic, V.

  9. 40 CFR 63.344 - Performance test requirements and test methods.

    Science.gov (United States)

    2010-07-01

    ... electroplating tanks or chromium anodizing tanks. The sampling time and sample volume for each run of Methods 306... Chromium Anodizing Tanks § 63.344 Performance test requirements and test methods. (a) Performance test... Emissions From Decorative and Hard Chromium Electroplating and Anodizing Operations,” appendix A of this...

  10. Expectancy of an open-book test decreases performance on a delayed closed-book test.

    Science.gov (United States)

    Agarwal, Pooja K; Roediger, Henry L

    2011-11-01

    Two experiments examined the influence of practice with, and the expectancy of, open-book tests (students viewed studied material while taking the test) versus closed-book tests (students completed the test without viewing the studied material) on delayed retention and transfer. Using GRE materials specifically designed for open-book testing, participants studied passages and then took initial open- or closed-book tests. Open-book testing led to better initial performance than closed-book testing, but on a delayed criterial (closed-book) test both types of testing produced similar retention after a two-day delay in Experiment 1. In Experiment 2 participants were informed in advance about the type of delayed criterial test to expect (open- or closed-book). Expecting an open-book test (relative to a closed-book test) decreased participants' time spent studying and their delayed test performance on closed-book comprehension and transfer tests, demonstrating that test expectancy can influence long-term learning. Expectancy of open-book tests may impair long-term retention and transfer compared to closed-book tests, despite superior initial performance on open-book tests and students' preference for open-book tests.

  11. Nuclebras' installations for performance tests of nuclear power plants components

    International Nuclear Information System (INIS)

    Vasconcelos Paiva, I.P. de; Avelar Esteves, F. de; Horta, J.A.L.; Resende, M.F.R.; Pinheiro, R.B.

    1984-01-01

    The reasons for Nuclebras' Nuclear Technology Development Center to implement a laboratory for supporting Brazilian manufactures, giving to them the means for performing functional tests of industrial products, are presented. A brief description of facilities under construction: the components Test Loop and Facility for Testing N.P.P. components under Accident conditions, and other already in operation, as well as its objectives and main technical characteristics. Some test results had already obtained are also presented. (Author) [pt

  12. A Framework for Fully Automated Performance Testing for Smart Buildings

    DEFF Research Database (Denmark)

    Markoska, Elena; Johansen, Aslak; Lazarova-Molnar, Sanja

    2018-01-01

    , setup of performance tests has been manual and labor-intensive and has required intimate knowledge of buildings’ complexity and systems. The emergence of the concept of smart buildings has provided an opportunity to overcome this restriction. In this paper, we propose a framework for automated......A significant proportion of energy consumption by buildings worldwide, estimated to ca. 40%, has yielded a high importance to studying buildings’ performance. Performance testing is a mean by which buildings can be continuously commissioned to ensure that they operate as designed. Historically...... performance testing of smart buildings that utilizes metadata models. The approach features automatic detection of applicable performance tests using metadata queries and their corresponding instantiation, as well as continuous commissioning based on metadata. The presented approach has been implemented...

  13. Test anxiety, perfectionism, goal orientation, and academic performance.

    Science.gov (United States)

    Eum, KoUn; Rice, Kenneth G

    2011-03-01

    Dimensions of perfectionism and goal orientation have been reported to have differential relationships with test anxiety. However, the degree of inter-relationship between different dimensions of perfectionism, the 2 × 2 model of goal orientations proposed by Elliot and McGregor, cognitive test anxiety, and academic performance indicators is not known. Based on data from 134 university students, we conducted correlation and regression analyses to test associations between adaptive and maladaptive perfectionism, four types of goal orientations, cognitive test anxiety, and two indicators of academic performance: proximal cognitive performance on a word list recall test and distal academic performance in terms of grade point average. Cognitive test anxiety was inversely associated with both performance indicators, and positively associated with maladaptive perfectionism and avoidance goal orientations. Adaptive and maladaptive perfectionism accounted for significant variance in cognitive test anxiety after controlling for approach and avoidance goal orientations. Overall, nearly 50% of the variance in cognitive test anxiety could be attributed to gender, goal orientations, and perfectionism. Results suggested that students who are highly test anxious are likely to be women who endorse avoidance goal orientations and are maladaptively perfectionistic.

  14. Exploration of task performance tests in a physics laboratory

    Science.gov (United States)

    Liu, Dan; El Turkey, Houssein

    2017-11-01

    In this article, we investigate the implementation of task performance tests in an undergraduate physics laboratory. Two performance tests were carried out over two semesters using the task of building a DC circuit. The first implementation in Spring 2014 had certain concerns such as the privacy of students’ testing and their ‘trial and error’ attempts. These concerns were addressed in Fall 2015 through implementing a second performance test. The second implementation was administered differently but the content of the two tests was the same. We discuss the validity of both implementations and present the correlation (or lack of) between the time that students needed to complete the tests and their grades from a paper-based laboratory assessment method.

  15. Plan de implementación de un SGSI acorde a la norma ISO/IEC 27001:2005

    OpenAIRE

    Álvarez Verdugo, Joaquín

    2014-01-01

    Plan de implementación de un SGSI acorde a la norma ISO/IEC 27001:2005 en un organismo público municipal. Pla d'implementació d'un SGSI d'acord amb la norma ISO/IEC 27001:2005 en un organisme públic municipal. Master thesis for the ICT Security management program.

  16. Personal dosimetry performance testing in the United States

    International Nuclear Information System (INIS)

    Soares, Christopher G.

    2008-01-01

    The basis for personal dosimetry performance testing in the United States is ANSI/HPS N13.11. Now in it's fourth edition, this standard has been in place since 1983. Testing under this standard is administered by the National Voluntary Laboratory Accreditation Program (NVLAP), and accreditation of dosimetry processors under this program is required by U.S. Nuclear Regulatory Commission (NRC) regulations. The U.S. Department of Energy (DOE) also maintains a testing program for its laboratories and contractors, administered by the Department of Energy Laboratory Accreditation Program (DOELAP). One of the goals of this current revision was the modification of ANSI/HPS N13.11 to allow acceptance by both testing programs in order to bring harmonization to U.S. personal dosemeter performance testing. The testing philosophy of ANSI/HPS N13.11 has always combined elements of type testing and routine performance testing and is thus different from the testing philosophy used in the rest of the world. In this paper, the history of performance testing in the U.S. is briefly reviewed. Also described is the revision that produced the fourth edition of this standard, which has taken place over the last three years (2005-2008) by a working group representing national standards laboratories, government laboratories, the military, dosimetry vendors, universities and the nuclear power industry. (author)

  17. The study of the energetic performance in test cycles

    Science.gov (United States)

    Rentea, Cristian; Tuca, Alexandra; Oprean, Mircea; Marius, Bataus

    2017-10-01

    One of the most important subsystems of modern passenger cars is the transmission. This paper aims to investigate the global performances of a modern transmission in different test cycles including the newly introduced WLTC (Worldwide Harmonized Light Vehicles Test Cycle). The study is done using a complex model developed in a performant simulation environment. Transmission efficiency calculation is emphasized, the efficiency being considered variable depending on engine torque, engine speed and gear ratio. The main important parameters (vehicle speed fluctuation, overall transmission efficiency, fuel consumption ratio) needed to compare test cycles and the transmissions performance are determined.

  18. Interlaboratory comparison and accreditation in quality control testing of diagnostic X-ray equipment

    International Nuclear Information System (INIS)

    Kepler, K.; Vladimirov, A.; Servomaa, A.

    2005-01-01

    The Univ. of Tartu provides a quality control service to the majority of diagnostic X-ray departments in Estonia. Its methodology has been adopted from the IEC and other relevant standards. Recently the Testing Centre of the Univ. of Tartu was accredited on this methodology by ISO/IEC 17025. Besides the implementation of the quality management system, participation in interlaboratory comparison (ILC) was one of the prerequisites for the accreditation. Tests for estimating reproducibility of tube voltage and dose rate, accuracy of the voltage and accuracy of exposure time were carried out on a diagnostic X-ray unit in the Radiation and Nuclear Safety Authority in Helsinki. The measurement performance was judged by calculating deviation En normalised with respect to the stated uncertainties. En values for all tests were less than unity and by the common ILC criteria the testing performance could be considered as acceptable. (authors)

  19. Comparison test of electronic dosemeters

    International Nuclear Information System (INIS)

    Butterweck, G.; Zimmerli, H.P.; Wernli, C.

    2001-01-01

    To assist with a planned purchase of electronic dosemeters by the Swiss Federal Office for Civil Protection, the calibration laboratory of the Paul Scherrer Institute performed tests on 11 types of electronic dosemeters manufactured by 10 European and American companies. The technical specifications for the World Trade Organisation (WTO) tendering procedure were largely in accord with the specifications of the international standard IEC 61526. First tests were performed with samples from each type of dosemeter. The reproducibility of a dose of 0.1 mSv generated with 137 Cs radiation at a dose rate of 2.1 mSv.h -1 was found adequate for all tested dosemeter types. The response for environmental levels of radiation showed a large variation, indicating insufficient background correction of some dosemeters. A very high dose rate of 10 Sv.h -1 provoked faulty dose readings for more than half of the tested dosemeters. Dosemeter response for low-energy photon radiation was satisfactory for two of the tested dosemeter types. Four dosemeter types were selected for extended technical tests. Three samples of each of these dosemeter types were purchased. For drop and temperature tests the specifications of the WTO tendering procedure outranged the specification of the IEC standard. Whereas even at a temperature of -25 deg. C the tested dosemeters functioned normally, drops from a height of 2 m onto a wooden surface rendered the samples of two dosemeter types inoperative. (author)

  20. ISO/IEC 17025: custos de acreditação em uma universidade pública brasileira

    Directory of Open Access Journals (Sweden)

    Rodrigo S. Bender

    2017-01-01

    Full Text Available ISO/IEC 17025 is an international standard that specifies the general requirements for evaluating the competence of laboratories involved in testing and calibration. This standard brings several benefits to university laboratories, which, thus, seek to obtain the accreditation. However, although cost is one of the main obstacles in this process; this topic has not been sufficiently studied. Since the Universidade Federal de Santa Maria (UFSM supports its laboratories for the implementation of this standard, it was chosen for this article to identify and quantify the accreditation costs of its laboratories that have obtained it or are working toward the goal. An exploratory literature review was carried out, and the data gathered were analyzed qualitatively and quantitatively. This study observed that the costs related to hours worked are linked to staff qualification and that high expenses in equipment and infrastructure occur in laboratories that receive financial resources from external providers.

  1. Performance Testing Methodology for Safety-Critical Programmable Logic Controller

    International Nuclear Information System (INIS)

    Kim, Chang Ho; Oh, Do Young; Kim, Ji Hyeon; Kim, Sung Ho; Sohn, Se Do

    2009-01-01

    The Programmable Logic Controller (PLC) for use in Nuclear Power Plant safety-related applications is being developed and tested first time in Korea. This safety-related PLC is being developed with requirements of regulatory guideline and industry standards for safety system. To test that the quality of the developed PLC is sufficient to be used in safety critical system, document review and various product testings were performed over the development documents for S/W, H/W, and V/V. This paper provides the performance testing methodology and its effectiveness for PLC platform conducted by KOPEC

  2. Recommended procedures for performance testing of radiobioassay laboratories: Volume 3, In vivo test phantoms

    International Nuclear Information System (INIS)

    MacLellan, J.A.; Traub, R.J.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed for the US Department of Energy and the US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard describes the procedures necessary to establish a bioassay performance-testing laboratory and program. The bioassay performance-testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped develop testing procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria by testing the existing measurement capabilities of various bioassay laboratories. This report recommends guidelines for the preparation, handling, storage, distribution, shipping, and documentation of test phantoms used for calibration of measurement systems for direct bioassay. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented

  3. Cognitive Fatigue Influences Students’ Performance on Standardized Tests

    DEFF Research Database (Denmark)

    Sievertsen, Hans Henrik; Gino, Francesca; Piovesan, Marco

    2016-01-01

    We identify one potential source of bias that influences children’s performance on standardized tests and that is predictable based on psychological theory: the time at which students take the test. Using test data for all children attending Danish public schools between school years 2009....../10 and 2012/13, we find that, for every hour later in the day, test scores decrease by 0.9% of an SD. In addition, a 20- to 30-minute break improves average test scores. Time of day affects students’ test performance because, over the course of a regular day, students’ mental resources get taxed. Thus......, as the day wears on, students become increasingly fatigued and consequently more likely to underperform on a standardized test....

  4. Wind Turbine Generator System Acoustic Noise Test Report for the ARE 442 Wind Turbine

    Energy Technology Data Exchange (ETDEWEB)

    Huskey, A.; van Dam, J.

    2010-11-01

    This test was conducted on the ARE 442 as part of the U.S. Department of Energy's (DOE's) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. In total, five turbines are being tested at the National Wind Technology Center (NWTC) as a part of this project. Acoustic noise testing is one of up to five tests that may be performed on the turbines, including duration, safety and function, power performance, and power quality tests. The acoustic noise test was conducted to the IEC 61400-11 Edition 2.1.

  5. Upgrading the Medical Physics Calibration Laboratory Towards ISO/IEC 17025: Radiation Standards and Calibration in Diagnostic Radiology

    International Nuclear Information System (INIS)

    Asmaliza Hashim; Muhammad Jamal Md Isa; Abd Aziz Mhd Ramli; Wan Hazlinda Ismail; Norhayati Abdullah; Shahrul Azlan Azizan; Siti Sara Deraman; Nor Azlin Azraai; Md Khairusalih Md Zin

    2010-01-01

    Calibration of quality control (QC) test tools used in diagnostic radiology is legally required under the Ministry of Health (MOH) requirement. The Medical Physics Calibration Laboratory of the Malaysian Nuclear Agency is the national focal point for the calibration of quality control test tools used in diagnostic radiology. The Medical Physics Calibration Laboratory has measurement traceability to primary standard dosimetry laboratory (Physikalisch-Technische Bundesanstalt (PTB)), thus providing an interface between the primary standard dosimetry laboratory and Malaysian hospitals, clinics and license class H holder. The Medical Physics Calibration Laboratory facility is comprised of a constant potential x-ray system with a capability of 160 kV tube and a series of reference and working standard ion chambers. The stability of reference and working standard ion chambers was measured using strontium-90. Dosimetric instruments used in diagnostic radiology is calibrated in terms of air kerma to comply with an International Code of Practices of dosimetry for example IAEA's Technical Report Series number 457. The new series of standard radiation qualities was established based on ISO/IEC 61267. The measurement of beam homogeneity was measured using film and ion chamber to define the field size at certain distance and kV output was measured using the spectrometer and non-invasive kVp meter. The uncertainties measurement was determined with expended uncertainties to a level of confidence of approximately 95% (coverage factor k=2). This paper describes the available facility and the effort of the Medical Physics Calibration Laboratory to upgrade the laboratory towards ISO/IEC 17025. (author)

  6. Implementation of Electrical Simulation Model for IEC Standard Type-3A Generator

    DEFF Research Database (Denmark)

    Subramanian, Chandrasekaran; Casadei, Domenico; Tani, Angelo

    2013-01-01

    This paper describes the implementation of electrical simulation model for IEC 61400-27-1 standard Type-3A generator. A general overview of the different wind electric generators(WEG) types are given and the main focused on Type-3A WEG standard models, namely a model for a variable speed wind tur...

  7. Leveraging Software Architectures through the ISO/IEC 42010 standard: A Feasibility Study

    NARCIS (Netherlands)

    Tamburri, D.A.; Lago, P.; Muccini, H.; Proper, E.; Lankhorst, M.; Schoenherr, M.

    2011-01-01

    The state of the practice in enterprise and software architecture learnt that relevant architectural aspects should be illustrated in multiple views, targeting the various concerns of different stakeholders. This has been expressed a.o. in the ISO/IEC 42010 Standard on architecture descriptions. In

  8. Internal Audit Status For ISO 9001 And ISO/ IEC 17025 In Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Fazila Said; Nurul Huda Mudri; Nik Arlina Ali

    2012-01-01

    The development of MS ISO 9001 and MS ISO/ IEC 17025 in Malaysian Nuclear Agency is the basic step to enhance and improve the Quality Management System (QMS) for processes and laboratories that involve customers and suppliers in delivering products and services. The effectiveness of QMS is monitored by Research and Innovation Management Centre (RIMC) to ensure that all activities related to audit such as Internal Audit are well organized and implemented as documented in quality manual and procedure. This paper will discuss the status of internal audit for processes that implement MS ISO 9001 and laboratories that accredited with MS/ ISO IEC 17025 in year 2008, 2009 and 2010. The total of non-conformance (nc) and opportunity for improvement (ofi) for processes and laboratories and their numbers as per clause in MS ISO 9001 and MS ISO/ IEC 17025 are the indicators that reflects the effectiveness of QMS. Then, the total effectiveness of QMS for MS 9001 and MS ISO/ IEC 17025 is also determined via the number of conformance clause versus non-conformance clause for those three years. (author)

  9. Implementing service quality based on ISO/IEC 20000 a management guide

    CERN Document Server

    Kunas, Michael

    2012-01-01

    Potential customers will look for suppliers with ISO/IEC 20000 certification, seeking the reassurance it provides. This book will guide you through implementation and certification. Your streamlined management processes will enable you to offer first-class customer service at competitive prices. The impact on your profit margins is clear!

  10. Understanding IEC standard wind turbine models using SimPowerSystems

    DEFF Research Database (Denmark)

    Das, Kaushik; Hansen, Anca Daniela; Sørensen, Poul Ejnar

    2016-01-01

    This article describes and exemplifies the IEC 61400-27 generic wind turbine models through an interactive multimedia learning environment - Matlab SimPowerSystems. The article aims help engineers with different backgrounds to get a better understanding of wind turbine dynamics and control...

  11. A fully automated system for ultrasonic power measurement and simulation accordingly to IEC 61161:2006

    NARCIS (Netherlands)

    Costa-Felix, R.P.B.; Alvarenga, A.V.; Hekkenberg, R.

    2011-01-01

    The ultrasonic power measurement, worldwide accepted, standard is the IEC 61161, presently in its 2nd edition (2006), but under review. To fulfil its requirements, considering that a radiation force balance is to be used as ultrasonic power detector, a large amount of raw data (mass measurement)

  12. Reliability Prediction Approaches For Domestic Intelligent Electric Energy Meter Based on IEC62380

    Science.gov (United States)

    Li, Ning; Tong, Guanghua; Yang, Jincheng; Sun, Guodong; Han, Dongjun; Wang, Guixian

    2018-01-01

    The reliability of intelligent electric energy meter is a crucial issue considering its large calve application and safety of national intelligent grid. This paper developed a procedure of reliability prediction for domestic intelligent electric energy meter according to IEC62380, especially to identify the determination of model parameters combining domestic working conditions. A case study was provided to show the effectiveness and validation.

  13. Performance Test of Parabolic Trough Solar Cooker for Indoor ...

    African Journals Online (AJOL)

    Bheema

    mm diameter copper pipe is the optimum size for the absorber. Maximum temperatures of ... This paper deals with improving and testing performance of a concentrating cooker for indoor cooking with ... bean oil Soya bean oil. Coating material.

  14. Round robin performance testing of organic photovoltaic devices

    DEFF Research Database (Denmark)

    Gevorgyan, Suren; Zubillaga, Oihana; de Seoane, José María Vega

    2014-01-01

    This study addresses the issue of poor intercomparability of measurements of organic photovoltaic (OPV) devices among different laboratories. We present a round robin performance testing of novel OPV devices among 16 laboratories, organized within the framework of European Research Infrastructure...

  15. Corrosion performance tests for reinforcing steel in concrete : technical report.

    Science.gov (United States)

    2009-10-01

    The existing test method used to assess the corrosion performance of reinforcing steel embedded in : concrete, mainly ASTM G 109, is labor intensive, time consuming, slow to provide comparative results, : and can be expensive. However, with corrosion...

  16. RELATIONSHIPS BETWEEN FUNCTIONAL MOVEMENT TESTS AND PERFORMANCE TESTS IN YOUNG ELITE MALE BASKETBALL PLAYERS.

    Science.gov (United States)

    Gonzalo-Skok, Oliver; Serna, Jorge; Rhea, Matthew R; Marín, Pedro J

    2015-10-01

    Sprinting and jumping are two common and important components of high-level sport performance. The weight-bearing dorsiflexion test (WB-DF) and Star Excursion Balance Test (SEBT) are tools developed to identify athletes at risk for lower extremity injury and may be related to running and jumping performance among athletes. The purposes of the present study were: 1) to identify any relationships between functional movement tests (WB-DF and SEBT) and performance tests (jumping, sprinting and changing direction); 2) to examine any relationships between asymmetries in functional movements and performance tests. Descriptive cohort study. Fifteen elite male basketball players (age: 15.4 ± 0.9 years) were assessed during a three-week period to determine the reliability of functional screening tools and performance tests and to examine the relationships between these tests. Relative (intraclass correlation coefficient) and absolute (coefficient of variation) reliability were used to assess the reproducibility of the tests. Significant correlations were detected between certain functional movement tests and performance tests. Both left and right excursion composite scores related to slower performance times in sprint testing, demonstrating that greater dynamic reach relates to decreased quickness and acceleration among these elite basketball athletes. The various relationships between dynamic functional movement testing, speed, and jump performance provide guidance for the strength and conditioning professional when conducting and evaluating data in an effort to improve performance and reduce risk of injury. The results of the present study suggest that these functional and performance tests do not measure the same components of human movement, and could be paired as outcome measures for the clinical and sport assessment of lower extremity function. 2b.

  17. Compliance of the CERN electronics used by the LHC Cryogenic System with the Electromagnetic Compatibility (EMC) Norm IEC 61000 4-4

    CERN Document Server

    Casas, J

    2011-01-01

    Within the ITER-CERN collaboration agreement, task “PROCUREMENT OF CRYOGENIC THERMOMETERS TO MONITOR ITER MAGNETS AND FEEDER TEMPERATURES”, CERN is recommending the use by ITER of LHC like electronics for the temperature channels. ITER require that any electronic equipment shall be qualified according to the standard IEC 61000 4-4 that refers to the Electromagnetic compatibility (EMC), Part 4: Testing and measurement techniques, Section 4: Electrical fast transient/burst immunity test (EFT/B). This document describes the qualification procedure and the results for the LHC like temperature measurement chains according to the procedures described in the standard.

  18. Fracture testing and performance of beryllium copper alloy C 17510

    International Nuclear Information System (INIS)

    Murray, H.A.; Zatz, I.J.

    1992-01-01

    A series of test programs was undertaken on copper beryllium alloy C 17510 for several variations in material process and chemistry. These variations in C 17510 were primarily optimized for combinations of strength and conductivity. While originally intended for use as cyclically loaded high-field, high-strength conductors in fusion energy research, material testing of C 17510 has indicated that it is an attractive and economical alternative for a host of other structural, mechanical and electrical applications. ASTM tests performed on three variations of C 17510 alloys included both J-integral and plane strain fracture toughness testing (E813, E399) and fatigue crack growth rate tests (E647), as well as verifying tensile, hardness, Charpy, and other well defined mechanical properties. Fracture testing was performed at both room and liquid nitrogen temperatures, which bound the thermal environment anticipated for the fusion components being designed. Fatigue crack propagation stress ratios ranged from nominal zero to minus one at each temperature

  19. Human performance in nondestructive inspections and functional tests: Final report

    International Nuclear Information System (INIS)

    Harris, D.H.

    1988-10-01

    Human performance plays a vital role in the inspections and tests conducted to assure the physical integrity of nuclear power plants. Even when technically-sophisticated equipment is employed, the outcome is highly dependent on human control actions, calibrations, observations, analyses, and interpretations. The principal consequences of inadequate performance are missed or falsely-reported defects. However, the cost-avoidance that stems from addressing potential risks promptly, and the increasing costs likely with aging plants, emphasize that timeliness and efficiency are important inspection-performance considerations also. Human performance issues were studied in a sample of inspections and tests regularly conducted in nuclear power plants. These tasks, selected by an industry advisory panel, were: eddy-current inspection of steam-generator tubes; ultrasonic inspection of pipe welds; inservice testing of pumps and valves; and functional testing of shock suppressors. Information was obtained for the study from industry and plant procedural documents; training materials; research reports and related documents; interviews with training specialists, inspectors, supervisory personnel, and equipment designers; and first-hand observations of task performance. Eleven recommendations are developed for improving human performance on nondestructive inspections and functional tests. Two recommendations were for the more-effective application of existing knowledge; nine recommendations were for research projects that should be undertaken to assure continuing improvements in human performance on these tasks. 25 refs., 9 figs., 1 tab

  20. 42 CFR 84.103 - Man tests; performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Man tests; performance requirements. 84.103 Section 84.103 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Self-Contained Breathing Apparatus § 84.103 Man tests;...

  1. Current Status and Performance Tests of Korea Heat Load Test Facility KoHLT-EB

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sukkwon; Jin, Hyunggon; Shin, Kyuin; Choi, Boguen; Lee, Eohwak; Yoon, Jaesung; Lee, Dongwon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Kim, Duckhoi; Cho, Seungyon [National Fusion Research Institute, Daejeon (Korea, Republic of)

    2013-05-15

    A commissioning test has been scheduled to establish the installation and preliminary performance experiments of the copper hypervapotron mockups. And a qualification test will be performed to evaluate the CuCrZr duct liner in the ITER neutral beam injection facility and the ITER first wall small-scale mockups of the semi-prototype, at up to 1.5 and 5 MW/m{sup 2} high heat flux. Also, this system will be used to test other PFCs for ITER and materials for tokamak reactors. Korean high heat flux test facility(KoHLT-EB; Korea Heat Load Test facility - Electron Beam) by using an electron beam system has been constructed in KAERI to perform the qualification test for ITER blanket FW semi-prototype mockups, hypervapotron cooling devices in fusion devices, and other ITER plasma facing components. The commissioning and performance tests with the supplier of e-gun system have been performed on November 2012. The high heat flux test for hypervapotron cooling device and calorimetry were performed to measure the surface heat flux, the temperature profile and cooling performance. Korean high heat flux test facility for the plasma facing components of nuclear fusion machines will be constructed to evaluate the performance of each component. This facility for the plasma facing materials will be equipped with an electron beam system with a 60 kV acceleration gun.

  2. Evolution of IEC/TC 45 works and its sub-committees from 1960 to 1983

    International Nuclear Information System (INIS)

    Weill, J.

    1983-10-01

    The IEC, founded in 1906, is an independent international standards organization. Its standardization work deals with almost all branches of electrotechnology in the electrotechnical, electronical and data-processing field, covering all applications, as for example telecommunications and nuclear energy. The IEC Central Office is situated in Geneva (Switzerland). The Technical Committee No. 45 was set up in 1960 at the IEC general meeting in New Delhi, with the scope as given in the IEC Directory. Its revised scope is under consideration in the Committee of Action of the IEC and reads: ''To prepare international standards relating to electrical and electronic equipment and systems specific to nuclear applications''. The chart shows the organigram of the Technical Committee which comprises about 75 experts in the nuclear field from about 20 industrial countries. We can see here the standard diagram of a Technical Committee with its Sub-committees and Working Groups. The meetings are held in a member country at the request of its National Committee. One shows the places of the plenary meetings of TC 45 as well as the meetings of its Sub-committees and their Working Groups held till now. The Technical Committee 45 has in addition to its seven Working Groups also two Sub-committees having several further Working Groups of their own. The Sub-committee 45 A ''Reactor Instrumentation''. The Sub-committee 45 B ''Radiation protection instrumentation''. Till now TC 45 has published about 85 standards. Regarding work in preparation, one shows the present and future work within the Technical Committee and its Sub-committees. Impact of works and liaisons is briefly discussed [fr

  3. Performances on Symbol Digit Modalities Test, Color Trails Test, and modified Stroop test in a healthy, elderly Danish sample

    DEFF Research Database (Denmark)

    Vogel, Asmus; Stokholm, Jette; Jørgensen, Kasper

    2013-01-01

    This study presents Danish data for the Symbol Digit Modalities Test (SDMT), Color Trails Test (CTT), and a modified Stroop test from 100 subjects aged 60-87 years. Among the included demographic variables, age had the highest impact on test performances. Thus, the study presents separate data...

  4. Performance test of a bladeless turbine for geothermal applications

    Energy Technology Data Exchange (ETDEWEB)

    Steidel, R.; Weiss, H.

    1976-03-24

    The Possell bladeless turbine was tested at the LLL Geothermal Test Facility to evaluate its potential for application in the total flow process. Test description and performance data are given for 3000, 3500, 4000, and 4500 rpm. The maximum engine efficiency observed was less than 7 percent. It is concluded that the Possell turbine is not a viable candidate machine for the conversion of geothermal fluids by the total flow process. (LBS)

  5. Performance evaluation of activimeter for PET radiopharmaceutical measuring based on 18F

    International Nuclear Information System (INIS)

    Fragoso, Maria da Conceicao de Farias; Oliveira, Mercia Liane de; Lima, Fernando Roberto de Andrade

    2014-01-01

    Proficiency test is an essential tool to assess the reliability and accuracy of measurements. In this work, proficiency tests (Z-score, accuracy and relative deviation) were applied to evaluate the performance of the activimeter used at Radiopharmaceuticals Production Division of the Regional Center for Nuclear Sciences of the Northeast (CRCN-NE/CNEN). The results were evaluated in compliance with ISO/IEC Guide 43-1. Additionally, correction factors for different measurement geometries were determined experimentally for those devices. (author)

  6. Preliminary results of testing bioassay analytical performance standards

    International Nuclear Information System (INIS)

    Fisher, D.R.; Robinson, A.V.; Hadley, R.T.

    1983-08-01

    The analytical performance of both in vivo and in vitro bioassay laboratories is being studied to determine the capability of these laboratories to meet the minimum criteria for accuracy and precision specified in the draft ANSI Standard N13.30, Performance Criteria for Radiobioassay. This paper presents preliminary results of the first round of testing

  7. Effects of Vigorous Intensity Physical Activity on Mathematics Test Performance

    Science.gov (United States)

    Phillips, David S.; Hannon, James C.; Castelli, Darla M.

    2015-01-01

    The effect of an acute bout of physical activity on academic performance in school-based settings is under researched. The purpose of this study was to examine associations between a single, vigorous (70-85%) bout of physical activity completed during physical education on standardized mathematics test performance among 72, eighth grade students…

  8. Towards Smart Buildings Performance Testing as a Service

    DEFF Research Database (Denmark)

    Markoska, Elena; Lazarova-Molnar, Sanja

    2018-01-01

    Energy consumption in buildings accounts for ca. 40% of the world’s total energy consumption, yielding a call for attention to their performance and improvement of their behavior. The concept of performance testing has been developed as an approach to control, potentially lower, and bring awarene...

  9. Motivation and performance in physical education: an experimental test.

    Science.gov (United States)

    Moreno, Juan A; González-Cutre, David; Martín-Albo, José; Cervelló, Eduardo

    2010-01-01

    The purpose of this study was to analyse, experimentally, the relationships between motivation and performance in a lateral movement test in physical education. The study group consisted of 363 students (227 boys and 136 girls), aged between 12 and 16, who were randomly divided into three groups: an experimental group in which an incremental ability belief was induced, another experimental group in which an entity ability belief was induced, and a control group where there was no intervention. Measurements were made of situational intrinsic motivation, perceived competence in executing the task and performance. The results revealed that the incremental group reported higher scores on the situational intrinsic motivation scale. The entity group demonstrated better performance in the first test attempt than the incremental group but, in the second attempt, the performance was similar in the different groups. Perhaps the initial differences in performance disappeared because the incremental group counted on improving in the second attempt. These results are discussed in relation to the intensity with which the teacher conveys information relating to incremental ability belief of the pupil to increase intrinsic motivation and performance. Key pointsThe incremental group showed more situational intrinsic motivation.The entity group showed higher performance in the first test attempt, but significant differences disappeared in the second attempt.It seems that this incremental belief and greater intrinsic motivation made the students trust they would improve their performance in the second attempt at the lateral movement test.

  10. The diagnostic odds ratio: a single indicator of test performance

    NARCIS (Netherlands)

    Glas, Afina S.; Lijmer, Jeroen G.; Prins, Martin H.; Bonsel, Gouke J.; Bossuyt, Patrick M. M.

    2003-01-01

    Diagnostic testing can be used to discriminate subjects with a target disorder from subjects without it. Several indicators of diagnostic performance have been proposed, such as sensitivity and specificity. Using paired indicators can be a disadvantage in comparing the performance of competing

  11. Performance test of a dual-purpose disc agrochemical applicator ...

    African Journals Online (AJOL)

    The performance test of a dual-purpose disc agrochemical applicator for field crop was conducted with view to assess the distribution patterns/droplet sizes and uniformity of spreading and or spraying for the agrochemical application. The equipment performances for both granular and liquid chemical application were ...

  12. Incremental exercise test performance with and without a respiratory ...

    African Journals Online (AJOL)

    Incremental exercise test performance with and without a respiratory gas collection system. ... PROMOTING ACCESS TO AFRICAN RESEARCH ... Industrial- type mask wear is thought to impair exercise performance through increased respiratory dead space, flow ... EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  13. [Performance of normal young adults in two temporal resolution tests].

    Science.gov (United States)

    Zaidan, Elena; Garcia, Adriana Pontin; Tedesco, Maria Lucy Fraga; Baran, Jane A

    2008-01-01

    temporal auditory processing is defined as the perception of sound or of sound alteration within a restricted time interval and is considered a fundamental ability for the auditory perception of verbal and non verbal sounds, for the perception of music, rhythm, periodicity and in the discrimination of pitch, duration and of phonemes. to compare the performance of normal Brazilian adults in two temporal resolution tests: the Gaps-in-Noise Test (GIN) and the Random Gap Detection Test (RGDT), and to analyze potential differences of performance in these two tests. twenty-five college students with normal hearing (11 males and 14 females) and no history of educational, neurological and/or language problems, underwent the GIN and RGDT at 40dB SL. statistically significant gender effects for both tests were found, with female participants showing poorer performance on both temporal processing tests. In addition, a comparative analysis of the results obtained in the GIN and RGDT revealed significant differences in the threshold measures derived for these two tests. In general, significantly better gap detection thresholds were observed for both male and female participants on the GIN test when compared to the results obtained for the RGDT. male participants presented better performances on both RGDT and GIN, when compared to the females. There were no differences in performance between right and left ears on the GIN test. Participants of the present investigation, males and females, performed better on the GIN when compared to the RGDT. The GIN presented advantages over the RGDT, not only in terms of clinical validity and sensibility, but also in terms of application and scoring.

  14. Motivational deficits and cognitive test performance in schizophrenia.

    Science.gov (United States)

    Fervaha, Gagan; Zakzanis, Konstantine K; Foussias, George; Graff-Guerrero, Ariel; Agid, Ofer; Remington, Gary

    2014-09-01

    Motivational and cognitive deficits are core features of schizophrenia, both closely linked with functional outcomes. Although poor effort and decreased motivation are known to affect performance on cognitive tests, the extent of this relationship is unclear in patients with schizophrenia. To evaluate the association between intrinsic motivation and cognitive test performance in patients with schizophrenia. Cross-sectional and 6-month prospective follow-up study performed at 57 sites in the United States, including academic and community medical treatment centers, participating in the Clinical Antipsychotic Trials of Intervention Effectiveness study. The primary sample included 431 stable patients with a DSM-IV diagnosis of schizophrenia currently receiving a stable medication regimen. Cognitive performance and intrinsic motivation were evaluated using a comprehensive neuropsychological test battery and a derived measure from the Heinrichs-Carpenter Quality of Life Scale, respectively. Symptom severity and functional status were also assessed. The primary outcome variable was global neurocognition. Individual domains of cognition were also evaluated for their association with motivation. Level of intrinsic motivation was significantly and positively correlated with global cognitive test performance, a relationship that held for each domain of cognition evaluated (correlation range, 0.20-0.34; P motivation and cognitive performance also remained significant after controlling for antipsychotic dose (P motivation during the 6-month follow-up was also found to be significantly related to improvement in global cognitive performance (P motivation and cognitive performance and suggest that test performance is not purely a measure of ability. Future studies assessing cognition in patients with schizophrenia should consider potential moderating variables such as effort and motivation. Implications for the assessment and interpretation of cognitive impairment based on

  15. Report on long range alpha detector (LRAD) performance tests

    International Nuclear Information System (INIS)

    Kobayashi, Hirohide; Unno, Motoyoshi; Ishikawa, Hisashi; Yoshida, Tadayoshi

    2002-10-01

    At present, alpha contamination measurement on objects is conducted with ZnS scintillation survey meter (direct method) and smear test (indirect method). But it is difficult to measure large and complicated objects by direct method. Long Range Alpha Detector (LRAD) was produced as a solution for this problem. We carried out performance tests of this LRAD. As a result of the performance tests, we confirmed the linear relation between the measurement values of LRAD and alpha-radioactivity on the surface of objects. (author)

  16. Testing Game-Based Performance in Team-Handball.

    Science.gov (United States)

    Wagner, Herbert; Orwat, Matthias; Hinz, Matthias; Pfusterschmied, Jürgen; Bacharach, David W; von Duvillard, Serge P; Müller, Erich

    2016-10-01

    Wagner, H, Orwat, M, Hinz, M, Pfusterschmied, J, Bacharach, DW, von Duvillard, SP, and Müller, E. Testing game-based performance in team-handball. J Strength Cond Res 30(10): 2794-2801, 2016-Team-handball is a fast paced game of defensive and offensive action that includes specific movements of jumping, passing, throwing, checking, and screening. To date and to the best of our knowledge, a game-based performance test (GBPT) for team-handball does not exist. Therefore, the aim of this study was to develop and validate such a test. Seventeen experienced team-handball players performed 2 GBPTs separated by 7 days between each test, an incremental treadmill running test, and a team-handball test game (TG) (2 × 20 minutes). Peak oxygen uptake (V[Combining Dot Above]O2peak), blood lactate concentration (BLC), heart rate (HR), sprinting time, time of offensive and defensive actions as well as running intensities, ball velocity, and jump height were measured in the game-based test. Reliability of the tests was calculated using an intraclass correlation coefficient (ICC). Additionally, we measured V[Combining Dot Above]O2peak in the incremental treadmill running test and BLC, HR, and running intensities in the team-handball TG to determine the validity of the GBPT. For the test-retest reliability, we found an ICC >0.70 for the peak BLC and HR, mean offense and defense time, as well as ball velocity that yielded an ICC >0.90 for the V[Combining Dot Above]O2peak in the GBPT. Percent walking and standing constituted 73% of total time. Moderate (18%) and high (9%) intensity running in the GBPT was similar to the team-handball TG. Our results indicated that the GBPT is a valid and reliable test to analyze team-handball performance (physiological and biomechanical variables) under conditions similar to competition.

  17. Wind Plant Models in IEC 61400-27-2 and WECC - latest developments in international standards on wind turbine and wind plant modeling

    DEFF Research Database (Denmark)

    Fortmann, Jens; Miller, Nicholas; Kazachkov, Yuri

    2015-01-01

    This paper describes the latest developments in the standardization of wind plant and wind plant controller models. As a first step IEC TC88 WG 27 and WECC jointly developed generic wind turbine models which have been published by WECC in 2014 and IEC in 2015 as IEC 61400-27-1, which also include...

  18. Duration Test Report for the Entegrity EW50 Wind Turbine

    Energy Technology Data Exchange (ETDEWEB)

    Smith, J.; Huskey, A.; Jager, D.; Hur, J.

    2012-12-01

    This report summarizes the results of a duration test that NREL conducted on the Entegrity EW50 wind turbine. This test was conducted in accordance with the International Electrotechnical Commissions' (IEC) standard, Wind Turbine Generator System Part 2: Design requirements for small wind turbines, IEC 61400-2 Ed.2.0, 2006-03.

  19. High-precision performance testing of the LHC power converters

    CERN Document Server

    Bastos, M; Dreesen, P; Fernqvist, G; Fournier, O; Hudson, G

    2007-01-01

    The magnet power converters for LHC were procured in three parts, power part, current transducers and control electronics, to enable a maximum of industrial participation in the manufacturing and still guarantee the very high precision (a few parts in 10-6) required by LHC. One consequence of this approach was several stages of system tests: factory reception tests, CERN reception tests, integration tests , short-circuit tests and commissioning on the final load in the LHC tunnel. The majority of the power converters for LHC have now been delivered, integrated into complete converter and high-precision performance testing is well advanced. This paper presents the techniques used for high-precision testing and the results obtained.

  20. Pavement Subgrade Performance Study in the Danish Road Testing Machine

    DEFF Research Database (Denmark)

    Ullidtz, Per; Ertman Larsen, Hans Jørgen

    1997-01-01

    Most existing pavement subgrade criteria are based on the AASHO Road Test, where only one material was tested and for only one climatic condition. To study the validity of these criteria and to refine the criteria a co-operative research program entitled the "International Pavement Subgrade...... Performance Study" was sponsored by the FHWA with American, Finnish and Danish partners. This paper describes the first test series which was carried out in the Danish Road Testing Machine (RTM).The first step in this program is a full scale test on an instrumented pavement in the Danish Road Testing Machine....... Pressure gauges and strain cells were installed in the upper part of the subgrade, for measuring stresses and strains in all three directions. During and after construction FWD testing was carried out to evaluate the elastic parameters of the materials. These parameters were then used with the theory...

  1. Correlation Between Screening Mammography Interpretive Performance on a Test Set and Performance in Clinical Practice.

    Science.gov (United States)

    Miglioretti, Diana L; Ichikawa, Laura; Smith, Robert A; Buist, Diana S M; Carney, Patricia A; Geller, Berta; Monsees, Barbara; Onega, Tracy; Rosenberg, Robert; Sickles, Edward A; Yankaskas, Bonnie C; Kerlikowske, Karla

    2017-10-01

    Evidence is inconsistent about whether radiologists' interpretive performance on a screening mammography test set reflects their performance in clinical practice. This study aimed to estimate the correlation between test set and clinical performance and determine if the correlation is influenced by cancer prevalence or lesion difficulty in the test set. This institutional review board-approved study randomized 83 radiologists from six Breast Cancer Surveillance Consortium registries to assess one of four test sets of 109 screening mammograms each; 48 radiologists completed a fifth test set of 110 mammograms 2 years later. Test sets differed in number of cancer cases and difficulty of lesion detection. Test set sensitivity and specificity were estimated using woman-level and breast-level recall with cancer status and expert opinion as gold standards. Clinical performance was estimated using women-level recall with cancer status as the gold standard. Spearman rank correlations between test set and clinical performance with 95% confidence intervals (CI) were estimated. For test sets with fewer cancers (N = 15) that were more difficult to detect, correlations were weak to moderate for sensitivity (woman level = 0.46, 95% CI = 0.16, 0.69; breast level = 0.35, 95% CI = 0.03, 0.61) and weak for specificity (0.24, 95% CI = 0.01, 0.45) relative to expert recall. Correlations for test sets with more cancers (N = 30) were close to 0 and not statistically significant. Correlations between screening performance on a test set and performance in clinical practice are not strong. Test set performance more accurately reflects performance in clinical practice if cancer prevalence is low and lesions are challenging to detect. Copyright © 2017 The Association of University Radiologists. Published by Elsevier Inc. All rights reserved.

  2. Pharmacists performing quality spirometry testing: an evidence based review.

    Science.gov (United States)

    Cawley, Michael J; Warning, William J

    2015-10-01

    The scope of pharmacist services for patients with pulmonary disease has primarily focused on drug related outcomes; however pharmacists have the ability to broaden the scope of clinical services by performing diagnostic testing including quality spirometry testing. Studies have demonstrated that pharmacists can perform quality spirometry testing based upon international guidelines. The primary aim of this review was to assess the published evidence of pharmacists performing quality spirometry testing based upon American Thoracic Society/European Respiratory Society (ATS/ERS) guidelines. In order to accomplish this, the description of evidence and type of outcome from these services were reviewed. A literature search was conducted using five databases [PubMed (1946-January 2015), International Pharmaceutical Abstracts (1970 to January 2015), Cumulative Index of Nursing and Allied Health Literature, Cochrane Central Register of Controlled Trials and Cochrane Database of Systematic Reviews] with search terms including pharmacy, spirometry, pulmonary function, asthma or COPD was conducted. Searches were limited to publications in English and reported in humans. In addition, Uniform Resource Locators and Google Scholar searches were implemented to include any additional supplemental information. Eight studies (six prospective multi-center trials, two retrospective single center studies) were included. Pharmacists in all studies received specialized training in performing spirometry testing. Of the eight studies meeting inclusion and exclusion criteria, 8 (100%) demonstrated acceptable repeatability of spirometry testing based upon standards set by the ATS/ERS guidelines. Acceptable repeatability of seven studies ranged from 70 to 99% consistent with published data. Available evidence suggests that quality spirometry testing can be performed by pharmacists. More prospective studies are needed to add to the current evidence of quality spirometry testing performed by

  3. Performance demonstration experience for reactor pressure vessel shell ultrasonic testing

    International Nuclear Information System (INIS)

    Zado, V.

    1998-01-01

    The most ultrasonic testing techniques used by many vendors for pressurized water reactor (PWR) examinations were based on American Society of Mechanical Engineers 'Boiler and Pressurized Vessel Code' (ASME B and PV Code) Sections XI and V. The Addenda of ASME B and PV Code Section XI, Edition 1989 introduced Appendix VIII - 'Performance Demonstration for Ultrasonic Examination Systems'. In an effort to increase confidence in performance of ultrasonic testing of the operating nuclear power plants in United States, the ultrasonic testing performance demonstration examination of reactor vessel welds is performed in accordance with Performance Demonstration Initiative (PDI) program which is based on ASME Code Section XI, Appendix VIII requirements. This article provides information regarding extensive qualification preparation works performed prior EPRI guided performance demonstration exam of reactor vessel shell welds accomplished in January 1997 for the scope of Appendix VIII, Supplements IV and VI. Additionally, an overview of the procedures based on requirements of ASME Code Section XI and V in comparison to procedure prepared for Appendix VIII examination is given and discussed. The samples of ultrasonic signals obtained from artificial flaws implanted in vessel material are presented and results of ultrasonic testing are compared to actual flaw sizes. (author)

  4. Double-shell tank integrity assessments ultrasonic test equipment performance test

    Energy Technology Data Exchange (ETDEWEB)

    Pfluger, D.C.

    1996-09-26

    A double-shell tank (DST) inspection (DSTI) system was performance tested over three months until August 1995 at Pittsburgh, Pennsylvania, completing a contract initiated in February 1993 to design, fabricate, and test an ultrasonic inspection system intended to provide ultrasonic test (UT) and visual data to determine the integrity of 28 DSTs at Hanford. The DSTs are approximately one-million-gallon underground radioactive-waste storage tanks. The test was performed in accordance with a procedure (Jensen 1995) that included requirements described in the contract specification (Pfluger 1995). This report documents the results of tests conducted to evaluate the performance of the DSTI system against the requirements of the contract specification. The test of the DSTI system also reflects the performance of qualified personnel and operating procedures.

  5. RTG performance on Galileo and Ulysses and Cassini test results

    International Nuclear Information System (INIS)

    Kelly, C. Edward; Klee, Paul M.

    1997-01-01

    Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Similar comparisons are made for the RTG on the Ulysses spacecraft which completed its planned mission in 1995. Also presented are test results from small scale thermoelectric modules and full scale converters performed for the Cassini program. The Cassini mission to Saturn is scheduled for an October 1997 launch. Small scale module test results on thermoelectric couples from the qualification and flight production runs are shown. These tests have exceeded 19,000 hours are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. Test results are presented for full scale units both ETGs (E-6, E-7) and RTGs (F-2, F-5) along with mission power predictions. F-5, fueled in 1985, served as a spare for the Galileo and Ulysses missions and plays the same role in the Cassini program. It has successfully completed all acceptance testing. The ten years storage between thermal vacuum tests is the longest ever experienced by an RTG. The data from this test are unique in providing the effects of long term low temperature storage on power output. All ETG and RTG test results to date indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of at least five percent are predicted

  6. RTG performance on Galileo and Ulysses and Cassini test results

    International Nuclear Information System (INIS)

    Kelly, C.E.; Klee, P.M.

    1997-01-01

    Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Similar comparisons are made for the RTG on the Ulysses spacecraft which completed its planned mission in 1995. Also presented are test results from small scale thermoelectric modules and full scale converters performed for the Cassini program. The Cassini mission to Saturn is scheduled for an October 1997 launch. Small scale module test results on thermoelectric couples from the qualification and flight production runs are shown. These tests have exceeded 19,000 hours are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. Test results are presented for full scale units both ETGs (E-6, E-7) and RTGs (F-2, F-5) along with mission power predictions. F-5, fueled in 1985, served as a spare for the Galileo and Ulysses missions and plays the same role in the Cassini program. It has successfully completed all acceptance testing. The ten years storage between thermal vacuum tests is the longest ever experienced by an RTG. The data from this test are unique in providing the effects of long term low temperature storage on power output. All ETG and RTG test results to date indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of at least five percent are predicted. copyright 1997 American Institute of Physics

  7. Electrical performance characteristics of the SSC Accelerator System String Test

    International Nuclear Information System (INIS)

    Robinson, W.; Burgett, W.; Dombeck, T.; Gannon, J.; Kraushaar, P.; McInturff, A.; Savord, T.; Tool, G.

    1993-05-01

    The string test facility was constructed to provide a development test bed for the arc regions of the Superconducting Super Collider (SSC). Significant effort has been devoted to the development and testing of superconducting magnets, spools, and accelerator control systems required for the SSC. The string test facility provides the necessary environment required to evaluate the operational performance of these components as they are configured as an accelerator lens in the collider. This discussion will review the results of high current testing of the string conducted to evaluate magnet element uniformity and compatibility, the splice resistance used to connect the magnets, and system response to various quench conditions. Performance results of the spools, energy bypass systems, energy dump, and the power supply system are also discussed

  8. Electrical performance characteristics of the SSC Accelerator System String Test

    International Nuclear Information System (INIS)

    Robinson, W.; Burgett, W.; Dombeck, T.; Gannon, J.; Kraushaar, P.; McInturff, A.; Savord, T.; Tool, G.

    1993-01-01

    The string test facility was constructed to provide a development test bed for the arc regions of the Superconducting Super Collider (SSC). Significant effort has been devoted to the development and testing of superconducting magnets, spools, and accelerator control systems required for the SSC. The string test facility provides the necessary environment required to evaluate the operational performance of these components as they are configured as an accelerator lens in the collider. This discussion will review the results of high current testing of the string conducted to evaluate magnet element uniformity and compatibility, the splice resistance used to connect the magnets, and system response to various quench conditions. Performance results of the spools, energy bypass systems, energy dump, and the power supply system are also discussed

  9. Performance and durability testing of parabolic trough receivers

    Science.gov (United States)

    Lei, Dongqiang; Fu, Xuqiang; Zhao, Dongming; Yuan, Guofeng; Wang, Zhifeng; Guo, Minghuan

    2017-06-01

    The paper describes the key performance and durability testing facilities of the parabolic trough receiver developed by Institute of Electrical Engineering, Chinese Academy of Sciences. The indoor heat loss test can be applied at 4-7 different temperature levels within 200-550 on receivers. The optical efficiency test bench consists of 12 metal halide lamps as the solar simulator and a 5 m length half-elliptical cylinder reflector with flat end reflectors. 3 ultra-precision temperature sensors are used in receiver each end to get the temperature difference. The residual gas analysis test bench is applied to analyze and predict the vacuum lifetime of the receiver. It can test the variations of composition and partial pressure of residual gases with temperature and time in the receiver annulus space by a high sensitivity quadrupole mass spectrometer gas analyzer. A coating accelerated ageing test bench, which is also used to test the thermal cycle, has been developed. This test bench uses the absorber tube of the recevier as the resistance heater to heat up the whole receiver. The coating lifetime can be predicted by the Arrhenius parameters. For the cycling test, the compressed air is used to directly cool the inner surface of the absorber tube. The thermal cycling test is performed with temperature cycles from 150 °C to 450 °C for 160 cycles. The maximum thermal cycling frequency is 8 cycles per day. The mechanical fatigue test bench is used to test the bellows and the glass-to-metal seals durability at the same time. Both bellows are expanded and compressed to 6.5 mm in turn with 10,000 cycles. A new rotating test bench was also developed to test the thermal efficiency of the receiver.

  10. Dynamic Performance Characteristic Tests of Real Scale Lead Rubber Bearing for the Evaluation of Performance Criteria

    International Nuclear Information System (INIS)

    Kim, Min Kyu; Kim, Jung-Han; Choi, In-Kil

    2014-01-01

    Dynamic characteristic tests of full scale lead rubber bearing were performed for the evaluation of performance criteria of isolation system for nuclear power plants. For the dynamic test for a full scale rubber bearing, two 1500mm diameter lead rubber bearings were manufactured. The viewpoints of this dynamic test are determination of an ultimate shear strain level of lead rubber bearing, behavior of rubber bearing according to static and dynamic input motion, sinusoidal and random (earthquake) motion, and 1-dimentional and 2-dimensional input motion. In this study, seismic isolation device tests were performed for the evaluation of performance criteria of isolation system. Through this test, it can be recognized that in the case of considering a mechanical property test, dynamic and multi degree of loading conditions should be determined. But these differences should be examined how much affect to the global structural behavior

  11. Play for Performance: Using Computer Games to Improve Motivation and Test-Taking Performance

    Science.gov (United States)

    Dennis, Alan R.; Bhagwatwar, Akshay; Minas, Randall K.

    2013-01-01

    The importance of testing, especially certification and high-stakes testing, has increased substantially over the past decade. Building on the "serious gaming" literature and the psychology "priming" literature, we developed a computer game designed to improve test-taking performance using psychological priming. The game primed…

  12. Full-Scale Fatigue Testing of a Wind Turbine Blade in Flapwise Direction and Examining the Effect of Crack Propagation on the Blade Performance

    Directory of Open Access Journals (Sweden)

    Othman Al-Khudairi

    2017-10-01

    Full Text Available In this paper, the sensitivity of the structural integrity of wind turbine blades to debonding of the shear web from the spar cap was investigated. In this regard, modal analysis, static and fatigue testing were performed on a 45.7 m blade for three states of the blade: (i as received blade (ii when a crack of 200 mm was introduced between the web and the spar cap and (iii when the crack was extended to 1000 mm. Calibration pull-tests for all three states of the blade were performed to obtain the strain-bending moment relationship of the blade according to the estimated target bending moment (BM which the blade is expected to experience in its service life. The resultant data was used to apply appropriate load in the fatigue tests. The blade natural frequencies in flapwise and edgewise directions over a range of frequency domain were found by modal testing for all three states of the blade. The blade first natural frequency for each state was used for the flapwise fatigue tests. These were performed in accordance with technical specification IEC TS 61400-23. The fatigue results showed that, for a 200 mm crack between the web and spar cap at 9 m from the blade root, the crack did not propagate at 50% of the target BM up to 62,110 cycles. However, when the load was increased to 70% of target BM, some damages were detected on the pressure side of the blade. When the 200 mm crack was extended to 1000 mm, the crack began to propagate when the applied load exceeded 100% of target BM and the blade experienced delaminations, adhesive joint failure, compression failure and sandwich core failure.

  13. Full-Scale Fatigue Testing of a Wind Turbine Blade in Flapwise Direction and Examining the Effect of Crack Propagation on the Blade Performance.

    Science.gov (United States)

    Al-Khudairi, Othman; Hadavinia, Homayoun; Little, Christian; Gillmore, Gavin; Greaves, Peter; Dyer, Kirsten

    2017-10-03

    In this paper, the sensitivity of the structural integrity of wind turbine blades to debonding of the shear web from the spar cap was investigated. In this regard, modal analysis, static and fatigue testing were performed on a 45.7 m blade for three states of the blade: (i) as received blade (ii) when a crack of 200 mm was introduced between the web and the spar cap and (iii) when the crack was extended to 1000 mm. Calibration pull-tests for all three states of the blade were performed to obtain the strain-bending moment relationship of the blade according to the estimated target bending moment (BM) which the blade is expected to experience in its service life. The resultant data was used to apply appropriate load in the fatigue tests. The blade natural frequencies in flapwise and edgewise directions over a range of frequency domain were found by modal testing for all three states of the blade. The blade first natural frequency for each state was used for the flapwise fatigue tests. These were performed in accordance with technical specification IEC TS 61400-23. The fatigue results showed that, for a 200 mm crack between the web and spar cap at 9 m from the blade root, the crack did not propagate at 50% of the target BM up to 62,110 cycles. However, when the load was increased to 70% of target BM, some damages were detected on the pressure side of the blade. When the 200 mm crack was extended to 1000 mm, the crack began to propagate when the applied load exceeded 100% of target BM and the blade experienced delaminations, adhesive joint failure, compression failure and sandwich core failure.

  14. History of personal dosimetry performance testing in the United States

    International Nuclear Information System (INIS)

    Soares, C. G.

    2007-01-01

    The basis for personal dosimetry performance testing in the United States is ANSI/HPS N13.11 (2001). Now in its third edition, this standard has been in place since 1983. Testing under this standard is administered by the National Voluntary Accreditation Program (NVLAP), and accreditation of dosimetry processors under this program is required by US Nuclear Regulatory Commission (NRC) regulations. The US Dept. of Energy (DOE) also maintains a testing program for its laboratories and contractors, administered by the Dept. of Energy Laboratory Accreditation Program (DOELAP). A focus in recent years has been the modification of ANSI/HPS N13.11 to allow acceptance by both testing programs in order to bring harmonisation to US personal dosemeter processing testing. Since there is no type testing program in the US for personal dosemeters, the testing philosophy of ANSI N13.11 has always combined elements of type testing and routine performance testing. This philosophy is explored in detail in this presentation, along with trends in the development of the document to its present state. In addition, a look will be taken at what the future holds for the next revision of the document, scheduled to begin in 2005. (authors)

  15. Personal dosimetry performance testing in the United States

    International Nuclear Information System (INIS)

    Soares, C.G.

    2005-01-01

    Full text: The basis for personal dosimetry performance testing in the United States is ANSI/HPS N13.11 (2002). Now in its third edition, this standard has been in place since 1983. Testing under this standard is administered by the National Voluntary Accreditation Program (NVLAP), and accreditation of dosimetry processors under this program is required by US Nuclear Regulatory Commission (NRC) regulations. The US Department of Energy (DOE) also maintains a testing program for its laboratories and contractors, administered by the Department of Energy Laboratory Accreditation Program (DOELAP). A focus in recent years has been the modification of ANSI/HPS N13.11 to allow acceptance by both testing programs in order to bring harmonization to US personal dosimeter processing testing. The testing philosophy of ANSI N13.11 has always combined elements of type testing and routine performance testing and is thus different from the testing philosophy used in the rest of the world. This unique philosophy is explored in detail in this presentation, along with trends in the development of the document to its present state. In addition, a look will be taken at what the future holds for the next revision of the document, scheduled to begin in 2005. (author)

  16. Design, Fabrication, and Performance Test of a 100-W Helical-Blade Vertical-Axis Wind Turbine at Low Tip-Speed Ratio

    Directory of Open Access Journals (Sweden)

    Dowon Han

    2018-06-01

    Full Text Available A 100-W helical-blade vertical-axis wind turbine was designed, manufactured, and tested in a wind tunnel. A relatively low tip-speed ratio of 1.1 was targeted for usage in an urban environment at a rated wind speed of 9 m/s and a rotational speed of 170 rpm. The basic dimensions were determined through a momentum-based design method according to the IEC 61400-2 protocol. The power output was estimated by a mathematical model that takes into account the aerodynamic performance of the NACA0018 blade shape. The lift and drag of the blade with respect to the angle of attack during rotation were calculated using 2D computational fluid dynamics (CFD simulation to take into account stall region. The average power output calculated by the model was 108.34 W, which satisfies the target output of 100 W. The manufactured wind turbine was tested in a large closed-circuit wind tunnel, and the power outputs were measured for given wind speeds. At the design condition, the measured power output was 114.7 W, which is 5.9% higher than that of the mathematical model. This result validates the proposed design method and power estimation by the mathematical model.

  17. Intercomparison of performance characteristics of OSLDs and TLDs used for individual monitoring

    International Nuclear Information System (INIS)

    Meye, Phillipe Ondo

    2016-07-01

    This research work performed an intercomparison on some important performance characteristics of optically stimulated luminescence (OSL) and thermoluminescence (TL) dosimetry systems used by dosimetry services in Gabon and Ghana, respectively. The study verified the status of the selected performance indicators and propose ways to improve the performances of individual monitoring services of Ghana and Gabon if found necessary. The performance indicators assessed included the zero - dose, the minimum detectability and some important reader performance characteristics. These tests were performed using statistical and experimental methods. The overall uncertainty in measurement of the dosimetry systems of Ghana and Gabon for Hp(10) was determined using the IEC technical report TR 62461, and comparisons were carried out with IAEA 99, PTB 99, IEC 1066 and IEC1283 series performance standards. The IEC 62387 standard was used to assess the linearity dependence of the response and the coefficient of variation of the two dosimetry systems. For the Harshaw TLD 6600 system of the dosimetry service of Ghana, the Reference light QC test meets the requirement given in the user manual. For the OSL system microStar of the dosimetry system of Gabon, the three QC tests, DRK count, CAL count and LED count, meet the user manual requirements. However all these tests failed the statistical test that is part of counting statistics. This led to the conclusion that there may be some abnormalities in the counting system, and that the statistical abnormalities suspected have apparently no impact on the results of the reading. It was also concluded that since the DRK count and the CAL count failed the Chi - squared test by very small margin, a Gaussian distribution could still be considered as an approximation of the experimental data distributions of these two QC measurements. The zero dose for the Harshaw 6600 and the microStar system were found to be 0.026 mSv and 0.08 mSv respectively

  18. Fast Flux Test Facility core restraint system performance

    International Nuclear Information System (INIS)

    Hecht, S.L.; Trenchard, R.G.

    1990-02-01

    Characterizing Fast Flux Test Facility (FFTF) core restraint system performance has been ongoing since the first operating cycle. Characterization consists of prerun analysis for each core load, in-reactor and postirradiation measurements of subassembly withdrawal loads and deformations, and using measurement data to fine tune predictive models. Monitoring FFTF operations and performing trend analysis has made it possible to gain insight into core restraint system performance and head off refueling difficulties while maximizing component lifetimes. Additionally, valuable information for improved designs and operating methods has been obtained. Focus is on past operating experience, emphasizing performance improvements and avoidance of potential problems. 4 refs., 12 figs., 2 tabs

  19. Measurement properties of continuous text reading performance tests.

    Science.gov (United States)

    Brussee, Tamara; van Nispen, Ruth M A; van Rens, Ger H M B

    2014-11-01

    Measurement properties of tests to assess reading acuity or reading performance have not been extensively evaluated. This study aims to provide an overview of the literature on available continuous text reading tests and their measurement properties. A literature search was performed in PubMed, Embase and PsycInfo. Subsequently, information on design and content of reading tests, study design and measurement properties were extracted using consensus-based standards for selection of health measurement instruments. Quality of studies, reading tests and measurement properties were systematically assessed using pre-specified criteria. From 2334 identified articles, 20 relevant articles were found on measurement properties of three reading tests in various languages: IReST, MNread Reading Test and Radner Reading Charts. All three reading tests scored high on content validity. Reproducibility studies (repeated measurements between different testing sessions) of the IReST and MNread of commercially available reading tests in different languages were missing. The IReST scored best on inter-language comparison, the MNread scored well in repeatability studies (repeated measurements under the same conditions) and the Radner showed good reproducibility in studies. Although in daily practice there are other continuous text reading tests available meeting the criteria of this review, measurement properties were described in scientific studies for only three of them. Of the few available studies, the quality and content of study design and methodology used varied. For testing existing reading tests and the development of new ones, for example in other languages, we make several recommendations, including careful description of patient characteristics, use of objective and subjective lighting levels, good control of working distance, documentation of the number of raters and their training, careful documentation of scoring rules and the use of Bland-Altman analyses or similar for

  20. Fracture testing and performance of beryllium copper alloy C17510

    International Nuclear Information System (INIS)

    Murray, H.A.; Zatz, I.J.

    1994-05-01

    When a literature search and discussion with manufacturers revealed that there was virtually no existing data related to the fracture properties and behavior of copper beryllium alloy C17510, a series of test programs was undertaken to ascertain this information for several variations in material processing and chemistry. These variations in C17510 were primarily optimized for combinations of strength and conductivity. While originally intended for use as cyclically loaded high-field, high-strength conductors in fusion energy research, material testing of C17510 has indicated that it is an attractive and economical alternative for a host of other structural, mechanical and electrical applications. ASTM tests performed on three variations of C17510 alloys included both J-integral and plane strain fracture toughness testing and fatigue crack growth rate tests, as well as verifying tensile, hardness, Charpy, and other well defined mechanical properties. Fracture testing was performed at both room and liquid nitrogen temperatures, which bound the thermal environment anticipated for the fusion components being designed. Fatigue crack propagation stress ratios ranged from nominal zero to minus one at each temperature. In order to confirm the test results, duplicate and independent test programs were awarded to separate facilities with appropriate test experience, whenever possible. The primary goal of the test program, to determine and bound the fracture toughness and Paris constants for C17510,was accomplished. In addition, a wealth of information was accumulated pertaining to crack growth characteristics, effects of directionality and potential testing pitfalls. The paper discusses the test program and its findings in detail

  1. Gamma-ray shielding design and performance test of WASTEF

    International Nuclear Information System (INIS)

    Matsumoto, Seiichiro; Aoyama, Saburo; Tashiro, Shingo; Nagai, Shiro

    1984-06-01

    The Waste Safety Testing Facility (WASTEF) was planned in 1978 to test the safety performance of HLW vitrified forms under the simulated conditions of long term storage and disposal, and completed in August 1981. The designed feature of the facility is to treat the vitrified forms contain actual high-level wastes of 5 x 10 4 Ci in maximum with 5 units of concrete shilded hot cells (3 units : Bate-Gamma cells, 2 units : Alpha-Gamma cells) and one units of Alpha-Gamma lead shielded cell, and to store radioactivity of 10 6 Ci in maximum. The safety performance of this facility is fundamentally maintained with confinement of radioactivity and shielding of the radiation. This report describes the method of gamma-ray shielding design, evaluation of the shielding test performed by using sealded gamma-ray sources(Co-60). (author)

  2. Light water reactor pressure isolation valve performance testing

    International Nuclear Information System (INIS)

    Neely, H.H.; Jeanmougin, N.M.; Corugedo, J.J.

    1990-07-01

    The Light Water Reactor Valve Performance Testing Program was initiated by the NRC to evaluate leakage as an indication of valve condition, provide input to Section XI of the ASME Code, evaluate emission monitoring for condition and degradation and in-service inspection techniques. Six typical check and gate valves were purchased for testing at typical plant conditions (550F at 2250 psig) for an assumed number of cycles for a 40-year plant lifetime. Tests revealed that there were variances between the test results and the present statement of the Code; however, the testing was not conclusive. The life cycle tests showed that high tech acoustic emission can be utilized to trend small leaks, that specific motor signature measurement on gate valves can trend and indicate potential failure, and that in-service inspection techniques for check valves was shown to be both feasible and an excellent preventive maintenance indicator. Life cycle testing performed here did not cause large valve leakage typical of some plant operation. Other testing is required to fully understand the implication of these results and the required program to fully implement them. (author)

  3. Radioactive material package test standards and performance requirements - public perception

    International Nuclear Information System (INIS)

    Pope, R.B.; Shappert, L.B.; Rawl, R.R.

    1992-01-01

    This paper addresses issues related to the public perception of the regulatory test standards and performance requirements for packaging and transporting radioactive material. Specifically, it addresses the adequacy of the package performance standards and testing for Type B packages, which are those packages designed for transporting the most hazardous quantities and forms of radioactive material. Type B packages are designed to withstand accident conditions in transport. To improve public perception, the public needs to better understand: (a) the regulatory standards and requirements themselves, (b) the extensive history underlying their development, and (c) the soundness of the technical foundation. The public needs to be fully informed on studies, tests, and analyses that have been carried out worldwide and form the basis of the regulatory standards and requirements. This paper provides specific information aimed at improving the public perception of packages test standards

  4. Test anxiety and academic performance in chiropractic students.

    Science.gov (United States)

    Zhang, Niu; Henderson, Charles N R

    2014-01-01

    Objective : We assessed the level of students' test anxiety, and the relationship between test anxiety and academic performance. Methods : We recruited 166 third-quarter students. The Test Anxiety Inventory (TAI) was administered to all participants. Total scores from written examinations and objective structured clinical examinations (OSCEs) were used as response variables. Results : Multiple regression analysis shows that there was a modest, but statistically significant negative correlation between TAI scores and written exam scores, but not OSCE scores. Worry and emotionality were the best predictive models for written exam scores. Mean total anxiety and emotionality scores for females were significantly higher than those for males, but not worry scores. Conclusion : Moderate-to-high test anxiety was observed in 85% of the chiropractic students examined. However, total test anxiety, as measured by the TAI score, was a very weak predictive model for written exam performance. Multiple regression analysis demonstrated that replacing total anxiety (TAI) with worry and emotionality (TAI subscales) produces a much more effective predictive model of written exam performance. Sex, age, highest current academic degree, and ethnicity contributed little additional predictive power in either regression model. Moreover, TAI scores were not found to be statistically significant predictors of physical exam skill performance, as measured by OSCEs.

  5. Large scale and performance tests of the ATLAS online software

    International Nuclear Information System (INIS)

    Alexandrov; Kotov, V.; Mineev, M.; Roumiantsev, V.; Wolters, H.; Amorim, A.; Pedro, L.; Ribeiro, A.; Badescu, E.; Caprini, M.; Burckhart-Chromek, D.; Dobson, M.; Jones, R.; Kazarov, A.; Kolos, S.; Liko, D.; Lucio, L.; Mapelli, L.; Nassiakou, M.; Schweiger, D.; Soloviev, I.; Hart, R.; Ryabov, Y.; Moneta, L.

    2001-01-01

    One of the sub-systems of the Trigger/DAQ system of the future ATLAS experiment is the Online Software system. It encompasses the functionality needed to configure, control and monitor the DAQ. Its architecture is based on a component structure described in the ATLAS Trigger/DAQ technical proposal. Regular integration tests ensure its smooth operation in test beam setups during its evolutionary development towards the final ATLAS online system. Feedback is received and returned into the development process. Studies of the system behavior have been performed on a set of up to 111 PCs on a configuration which is getting closer to the final size. Large scale and performance test of the integrated system were performed on this setup with emphasis on investigating the aspects of the inter-dependence of the components and the performance of the communication software. Of particular interest were the run control state transitions in various configurations of the run control hierarchy. For the purpose of the tests, the software from other Trigger/DAQ sub-systems has been emulated. The author presents a brief overview of the online system structure, its components and the large scale integration tests and their results

  6. Relationships Between Anaerobic Performance, Field Tests and Game Performance of Sitting Volleyball Players

    Directory of Open Access Journals (Sweden)

    Marszalek Jolanta

    2015-12-01

    Full Text Available The aim of this study was to evaluate relationships between anaerobic performance, field tests, game performance and anthropometric variables of sitting volleyball players. Twenty elite Polish sitting volleyball players were tested using the 30 s Wingate Anaerobic Test for arm crank ergometer and participated in six physical field tests. Heights in position to block and to spike, as well as arm reach were measured. Players were observed during the game on the court in terms of effectiveness of the serve, block, attack, receive and defense. Pearson analysis and the Spearman's rank correlation coefficient were used. The strongest correlations were found between the chest pass test and mean power and peak power (r=.846; p=.001 and r=.708; p=.0005, respectively, and also between the T-test and peak power (r= −.718; p=.001. Mean power correlated with the 3 m test (r= −.540; p=.014, the 5 m test (r= −.592; p=.006, and the T-test (r= −.582; p=.007. Peak power correlated with the 3 m test (r= −.632; p=.003, the 5 m test (r= −.613; p=.004, speed & agility (r= −.552; p=.012 and speed & endurance (r=−.546; p=.013. Significant correlations were observed between anthropometric parameters and anaerobic performance variables (p≤.001, and also between anthropometric parameters and field tests (p≤.05. Game performance and physical fitness of sitting volleyball players depended on their anthropometric variables: reach of arms, the position to block and to spike. The chest pass test could be used as a non-laboratory field test of anaerobic performance of sitting volleyball players.

  7. Delay model and performance testing for FPGA carry chain TDC

    International Nuclear Information System (INIS)

    Kang Xiaowen; Liu Yaqiang; Cui Junjian Yang Zhangcan; Jin Yongjie

    2011-01-01

    Time-of-flight (TOF) information would improve the performance of PET (position emission tomography). TDC design is a key technique. It proposed Carry Chain TDC Delay model. Through changing the significant delay parameter of model, paper compared the difference of TDC performance, and finally realized Time-to-Digital Convertor (TDC) based on Carry Chain Method using FPGA EP2C20Q240C8N with 69 ps LSB, max error below 2 LSB. Such result could meet the TOF demand. It also proposed a Coaxial Cable Measuring method for TDC testing, without High-precision test equipment. (authors)

  8. Enhancement on Wingate Anaerobic Test Performance With Hyperventilation.

    Science.gov (United States)

    Leithäuser, Renate M; Böning, Dieter; Hütler, Matthias; Beneke, Ralph

    2016-07-01

    Relatively long-lasting metabolic alkalizing procedures such as bicarbonate ingestion have potential for improving performance in long-sprint to middle-distance events. Within a few minutes, hyperventilation can induce respiratory alkalosis. However, corresponding performance effects are missing or equivocal at best. To test a potential performance-enhancing effect of respiratory alkalosis in a 30-s Wingate Anaerobic Test (WAnT). 10 men (mean ± SD age 26.6 ± 4.9 y, height 184.4 ± 6.1 cm, body-mass test 1 80.7 ± 7.7 kg, body-mass test 2 80.4 ± 7.2 kg, peak oxygen uptake 3.95 ± 0.43 L/min) performed 2 WAnTs, 1 with and 1 without a standardized 15-min hyperventilation program pre-WAnT in randomized order separated by 1 wk. Compared with the control condition, hyperventilation reduced (all P respiratory alkalosis can enhance WAnT cycling sprint performance well in the magnitude of what is seen after successful bicarbonate ingestion.

  9. Indicators of Ceriodaphnia dubia chronic toxicity test performance and sensitivity

    Energy Technology Data Exchange (ETDEWEB)

    Rosebrock, M.M.; Bedwell, N.J.; Ausley, L.W. [North Carolina Division of Environmental Management, Raleigh, NC (United States)

    1994-12-31

    The North Carolina Division of Environmental Management has begun evaluation of the sensitivity of test results used for measuring chronic whole effluent toxicity in North Carolina wastewater discharges. Approximately 67% of 565 facilities required to monitor toxicity by an NPDES permit perform a Ceriodaphnia dubia chronic, single effluent concentration (pass/fail) analysis. Data from valid Ceriodaphnia dubia chronic pass/fail tests performed by approximately 20 certified biological laboratories and submitted by North Carolina NPDES permittees were recorded beginning January 1992. Control and treatment reproduction data from over 2,500 tests submitted since 1992 were analyzed to determine the minimum significant difference (MSD) at a 99% confidence level for each test and the percent reduction from the control mean that the MSD represents (%MSD) for each certified laboratory. Initial results for the 20 laboratories indicate that the average intralaboratory percent MSD ranges 12.72% (n = 367) to 34.91% (n = 7) with an average of 23.08%. Additionally, over 3,800 tests were analyzed to determine the coefficient of variation (CV) for control reproduction for each test and the average for each certified biological laboratory. Preliminary review indicates that average interlaboratory control reproduction CV values range from 10.59% (n = 367) to 31.08% (n = 572) with a mean of 20.35%. The statistics investigated are indicators of intra/interlaboratory performance and sensitivity of Ceriodaphnia chronic toxicity analyses.

  10. Verification Test of Hydraulic Performance for Reactor Coolant Pump

    Energy Technology Data Exchange (ETDEWEB)

    Park, Sang Jun; Kim, Jae Shin; Ryu, In Wan; Ko, Bok Seong; Song, Keun Myung [Samjin Ind. Co., Seoul (Korea, Republic of)

    2010-01-15

    According to this project, basic design for prototype pump and model pump of reactor coolant pump and test facilities has been completed. Basic design for prototype pump to establish structure, dimension and hydraulic performance has been completed and through primary flow analysis by computational fluid dynamics(CFD), flow characteristics and hydraulic performance have been established. This pump was designed with mixed flow pump having the following design requirements; specific velocity(Ns); 1080.9(rpm{center_dot}m{sup 3}/m{center_dot}m), capacity; 3115m{sup 3}/h, total head ; 26.3m, pump speed; 1710rpm, pump efficiency; 77.0%, Impeller out-diameter; 349mm, motor output; 360kw, design pressure; 17MPaG. The features of the pump are leakage free due to no mechanical seal on the pump shaft which insures reactor's safety and law noise level and low vibration due to no cooling fan on the motor which makes eco-friendly product. Model pump size was reduced to 44% of prototype pump for the verification test for hydraulic performance of reactor coolant pump and was designed with mixed flow pump and canned motor having the following design requirements; specific speed(NS); 1060.9(rpm{center_dot}m{sup 3}/m{center_dot}m), capacity; 539.4m{sup 3}/h, total head; 21.0m, pump speed; 3476rpm, pump efficiency; 72.9%, Impeller out-diameter; 154mm, motor output; 55kw, design pressure; 1.0MPaG. The test facilities were designed for verification test of hydraulic performance suitable for pump performance test, homologous test, NPSH test(cavitation), cost down test and pressure pulsation test of inlet and outlet ports. Test tank was designed with testing capacity enabling up to 2000m{sup 3}/h and design pressure 1.0MPaG. Auxiliary pump was designed with centrifugal pump having capacity; 1100m{sup 3}/h, total head; 42.0m, motor output; 190kw

  11. Predictive testing of performance of metals in HTR service environments

    International Nuclear Information System (INIS)

    Kondo, T.; Shindo, M.; Tamura, M.; Tsuji, H.; Kurata, Y.; Tsukada, T.

    1982-01-01

    Status of the material testing in simulated HTGR environment is reviewed with special attention focused on the methodology of the prediction of performance in long time. Importance of controlling effective chemical potentials relations in the material-environmental interface is stressed in regard of the complex inter-dependent kinetic relation between oxidation and carbon transport. Based on the recent experimental observations, proposals are made to establish some procedures for conservative prediction of the metal performance

  12. Stereotype threat? Effects of inquiring about test takers' gender on conceptual test performance in physics

    Science.gov (United States)

    Maries, Alexandru; Singh, Chandralekha

    2015-12-01

    It has been found that activation of a stereotype, for example by indicating one's gender before a test, typically alters performance in a way consistent with the stereotype, an effect called "stereotype threat." On a standardized conceptual physics assessment, we found that asking test takers to indicate their gender right before taking the test did not deteriorate performance compared to an equivalent group who did not provide gender information. Although a statistically significant gender gap was present on the standardized test whether or not students indicated their gender, no gender gap was observed on the multiple-choice final exam students took, which included both quantitative and conceptual questions on similar topics.

  13. Performance test of solar-assisted ejector cooling system

    KAUST Repository

    Huang, Bin-Juine

    2014-03-01

    A solar-assisted ejector cooling/heating system (SACH-2k) is built and test result is reported. The solar-driven ejector cooling system (ECS) is connected in series with an inverter-type air conditioner (IAC). Several advanced technologies are developed in SACH-k2, including generator liquid level control in ECS, the ECS evaporator temperature control, and optimal control of fan power in cooling tower of ECS. From the field test results, the generator liquid level control performs quite well and keeps stable performance of ejector. The ECS evaporator temperature control also performs satisfactorily to keep ejector performance normally under low or fluctuating solar radiation. The fan power control system cooling tower performs stably and reduces the power consumption dramatically without affecting the ECS performance. The test results show that the overall system COPo including power consumptions of peripheral increases from 2.94-3.3 (IAC alone) to 4.06-4.5 (SACH-k2), about 33-43%. The highest COPo is 4.5. © 2013 Elsevier Ltd and IIR. All rights reserved.

  14. Method Performance of Total Mercury (Hg) Testing in the Biological Samples by Using Cold Vapour Atomic Absorption Spectrophotometer (CV-AAS)

    International Nuclear Information System (INIS)

    Susanna TS; Samin

    2007-01-01

    Method performance (validation) of total mercury (Hg) testing in the biological samples by using cold vapour atomic absorption spectrophotometer (CV-AAS) has been done. The objective of this research is to know the method performance of CV-AAS as one of points for the accreditation testing of laboratory according IS0/IEC 17025-2005. The method performance covering limit of detection (LOD), accuracy, precision and bias. As a standard material used SRM Oyster Tissue 15660 from Winopal Forshung Germany, whereas the biological samples were human hair. In principle of mercury testing for solid samples using CV-AAS is dissolving this sample and standard with 10 mL HNO 3 supra pure into a closed quartz tube and heating at 150 °C for 4 hours. The concentration of mercury in each samples was determined at the condition of operation were stirring time (T 1 ) 70 seconds, delay time (T 2 ) 15 seconds, heating time (T 3 ) 13 seconds and cooling time (T 4 ) of 25 seconds. Mercury ion in samples are reduced with SnCl 2 10 % in H 2 SO 4 20 %, and then the vapour of mercury from reduction is passed in NaOH 20 % solution and aquatridest. The result of method performance were: limit of detection (LOD) = 0.085 ng, accuracy 99.70 %, precision (RSD) = 1.64 % and bias = 0.30 %. From the validation result showed that the content of mercury total was in the range of certified values. The total mercury content (Hg) in human hair were varied from 406.93 - 699.07 ppb. (author)

  15. Effort, symptom validity testing, performance validity testing and traumatic brain injury.

    Science.gov (United States)

    Bigler, Erin D

    2014-01-01

    To understand the neurocognitive effects of brain injury, valid neuropsychological test findings are paramount. This review examines the research on what has been referred to a symptom validity testing (SVT). Above a designated cut-score signifies a 'passing' SVT performance which is likely the best indicator of valid neuropsychological test findings. Likewise, substantially below cut-point performance that nears chance or is at chance signifies invalid test performance. Significantly below chance is the sine qua non neuropsychological indicator for malingering. However, the interpretative problems with SVT performance below the cut-point yet far above chance are substantial, as pointed out in this review. This intermediate, border-zone performance on SVT measures is where substantial interpretative challenges exist. Case studies are used to highlight the many areas where additional research is needed. Historical perspectives are reviewed along with the neurobiology of effort. Reasons why performance validity testing (PVT) may be better than the SVT term are reviewed. Advances in neuroimaging techniques may be key in better understanding the meaning of border zone SVT failure. The review demonstrates the problems with rigidity in interpretation with established cut-scores. A better understanding of how certain types of neurological, neuropsychiatric and/or even test conditions may affect SVT performance is needed.

  16. Performance Tests of a Mechanical Pump in Sodium Environment

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Chungho; Kim, Jong-Man; Ko, Yung Joo; Kim, Byeongyeon; Cho, Youngil; Jung, Min-Hwan; Gam, Da-Young; Lee, Yong Bum; Jeong, Ji-Young; Kim, Jong-Bum [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Water is often selected as a surrogate test fluid because it is not only cheap, easily available and easy to handle but also its important hydraulic properties (density and kinematic viscosity) are very similar to that of the sodium. Nevertheless, to ensure the performance, safety, and operability of major components before its installation in the SFR, a series of demonstration experiments of some components in sodium environment should be positively necessary. So, SFR NSSS System Design Division of Korea Atomic Energy Research Institute (KAERI) built various sodium experimental facilities, especially STELLA-1 in 2012. STELLA-1 (Sodium inTegral Effect test Loop for safety simuLation and Assessment) is a large-scale separated effect test facility for demonstrating the thermal-hydraulic performances of major components such as a Sodium-to-Sodium heat exchanger (DHX), Sodium-to-Air heat exchanger (AHX) of the decay heat removal system, and mechanical sodium pump of the primary heat transport system (PHTS). The mechanical pump in-sodium performance test was successfully performed with good reproducibility of the experiment and data to compare hydraulic characteristic of a mechanical pump in-water was collected. In effect of temperature variation on the pump pressure head, reduction of pump pressure head at 250℃ by 0.57% of that of 300℃ maybe the result of an increase in sodium viscosity by 13.6% according to operating temperature decrease by 50℃. Also, we confirmed that the more flywheel weight, the longer halving time and the more initial flow rate when the pump seized, the shorter halving time. The results of the mechanical pump performance test data in sodium environment will be used to compare with that of the in water environment after the evaluation of measurement uncertainty for tests.

  17. X radiation qualities characterization following the standard IEC 61267 recommendations at the calibration laboratory of IPEN

    International Nuclear Information System (INIS)

    Franciscatto, Priscila Cerutti

    2009-01-01

    This work presents a methodology for the X radiation qualities characterization following the new recommendations of the standard 61267 of the International Electrotechnical Commission (IEC) to establish a new procedure for calibration of dosimetric systems used in the field of diagnostic radiology. The reference qualities radiation of IEC 61267: RQR 2 to RQR 10, RQA 2 to RQA 10, RQB 2 to RQB 10 and RQN 2 to RQN 10 were implanted at the calibration laboratory of IPEN (LCI). Their characteristics were analyzed through measurements of beam parameters such as: Practical peak voltage (PPV), specific additional filtrations for each qualities (high purity aluminum of about 99.9%), 1st and 2nd Half Value Layers, homogeneity coefficient. The inherent filtration of the X ray tube was also determined. With the establishment of these radiation qualities, the LCI will be ready to calibrate the measuring instruments of radiation in the new qualities, allowing an improvement in radiological services offered by IPEN. (author)

  18. DD fusion neutron production at UW-Madison using IEC devices

    Science.gov (United States)

    Fancher, Aaron; Michalak, Matt; Kulcinski, Gerald; Santarius, John; Bonomo, Richard

    2017-10-01

    An inertial electrostatic confinement (IEC) device using spherical, gridded electrodes at high voltage accelerates deuterium ions, allowing for neutrons to be produced within the device from DD fusion reactions. The effects of the device cathode voltage (30-170 kV), current (30-100 mA), and pressure (0.15-1.25 mTorr) on the neutron production rate have been measured. New high voltage capabilities have resulted in the achievement of a steady state neutron production rate of 3.3x108 n/s at 175 kV, 100 mA, and 1.0 mTorr of deuterium. Applications of IEC devices include the production of DD neutrons to detect chemical explosives and special nuclear materials using active interrogation methods. Research supported by US Dept. of Homeland Security Grant 2015-DN-077-AR1095 and the Grainger Foundation.

  19. Calibration Laboratory for Medical Physics towards ISO/ IEC 17025 accreditation: Experience and challenges

    International Nuclear Information System (INIS)

    Asmaliza Hashim; Abdul Aziz Ramli; Muhammad Jamal Isa; Sharul Azlan Azizan

    2011-01-01

    Medical Physics Calibration Laboratory is laboratory where placed under Medical Physics Group, Radiation Healthy and Safety Division. This laboratory offers calibration services to their customers that covered doses calibration, tube voltan (kVp), exposure doses, sensitometer and densitometer. After 12 years of operation, it is the right time for this laboratory to upgrade their quality services based on ISO/ IEC 17025. Accreditation scope covered calibration for diagnostic doses only. Starting from 2009, serious effort was done to prepare the quality documents that covered quality manual, quality procedure and work orders. Meanwhile, several series of audit were done by Quality Management Center (QMC), now Innovation Management Center (IMC) with collaboration with Standard Department. This paper works revealed challenges and experience during the process toward ISO/ IEC 17025 accreditation. (author)

  20. Analysis of Norm IEC 61850 in the transmission of data via communications network of substations

    Energy Technology Data Exchange (ETDEWEB)

    Renda, T.; Botura Junior, G. [Universidade Estadual Paulista (UNESP), Sorocaba, SP (Brazil); Mesquita, L.; Rizol, P.M.S.R. [Universidade Estadual Paulista (UNESP), Guaratingueta, SP (Brazil)

    2009-07-01

    The tendency of using a protocol allows electrical substations to become 'intelligent', that is, capable of communicating in a much more efficient manner. This greatly reduces the number of connections, and as a consequence optimizes the speed between messages. The Norm IEC 61850-9-2 came to minimize the use of cables for the interconnections of various equipment involved in safety procedures of a substation. The present paper, has the objective of identifying a way of integrating the Norm IEC-61850 with the transmission of data via 'Generic Object Oriented Substation Event' (GOOSE) and of substituting the direct connection of binary I/O's of the Intelligent Electronic Devices also known as IED's. (author)

  1. Architectural constraints in IEC 61508: Do they have the intended effect?

    International Nuclear Information System (INIS)

    Lundteigen, Mary Ann; Rausand, Marvin

    2009-01-01

    The standards IEC 61508 and IEC 61511 employ architectural constraints to avoid that quantitative assessments alone are used to determine the hardware layout of safety instrumented systems (SIS). This article discusses the role of the architectural constraints, and particularly the safe failure fraction (SFF) as a design parameter to determine the hardware fault tolerance (HFT) and the redundancy level for SIS. The discussion is based on examples from the offshore oil and gas industry, but should be relevant for all applications of SIS. The article concludes that architectural constraints may be required to compensate for systematic failures, but the architectural constraints should not be determined based on the SFF. The SFF is considered to be an unnecessary concept

  2. Rational Calibration of Four IEC 61400-1 Extreme External Conditions

    DEFF Research Database (Denmark)

    Larsen, Gunner Chr.; Hansen, Kurt Schaldemose

    2008-01-01

    Based on a set of asymptotic statistical models on closed form this paper presents a rational and consistent calibration of four extreme external conditions defined in the International Electrotechnical Commission (IEC) 61400-1 standard: extreme operating gust, extreme wind shear, extreme coheren...... and proposed specifications of the magnitudes of the extreme external wind conditions are highlighted and discussed using an illustrative example based on two selected terrain types. Copyright © 2008 John Wiley & Sons, Ltd....... gust with direction change and extreme wind direction change. These four extreme external conditions are used in the definition of six of the IEC 61400-1 ultimate load cases. The statistical models are based on simple and easily accessible mean wind speed and turbulence characteristics...

  3. Fluid flow measurements of Test Series A and B for the Small Scale Seal Performance Tests

    International Nuclear Information System (INIS)

    Peterson, E.W.; Lagus, P.L.; Lie, K.

    1987-12-01

    The degree of waste isolation achieved by a repository seal system is dependent upon the fluid flow characteristics, or permeability, of the seals. In order to obtain meaningful, site-specific data on the performance of various possible seal system components, a series of in situ experiments called the Small Scale Seal Performance Tests (SSSPT) are being conducted at the Waste Isolation Pilot Plant (WIPP). This report contains the results of gas flow, tracer penetration, and brine flow tests conducted on concrete seals in vertical (Test Series A) and horizontal (Test Series B) configurations. The test objectives were to evaluate the seal performance and to determine if there existed scaling effects which could influence future SSSPT designs. 3 refs., 77 figs

  4. Eurados trial performance test for neutron personal dosimetry

    DEFF Research Database (Denmark)

    Bordy, J.M.; Stadtmann, H.; Ambrosi, P.

    2001-01-01

    This paper reports on the results of a neutron trial performance test sponsored by the European Commission and organised by EURADOS. As anticipated, neutron dosimetry results were very dependent on the dosemeter type and the dose calculation algorithm. Fast neutron fields were generally well...

  5. Effective Rating Scale Development for Speaking Tests: Performance Decision Trees

    Science.gov (United States)

    Fulcher, Glenn; Davidson, Fred; Kemp, Jenny

    2011-01-01

    Rating scale design and development for testing speaking is generally conducted using one of two approaches: the measurement-driven approach or the performance data-driven approach. The measurement-driven approach prioritizes the ordering of descriptors onto a single scale. Meaning is derived from the scaling methodology and the agreement of…

  6. Fuel performance analysis for the HAMP-1 mini plate test

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Byoung Jin; Tahka, Y. W.; Yim, J. S.; Lee, B. H. [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    U-7wt%Mo/Al- 5wt%Si dispersion fuel with 8gU/cm{sup 3} is chosen to achieve more efficiency and higher performance than the conventional U{sub 3}Si{sub 2} fuel. As part of the fuel qualification program for the KiJang research reactor (KJRR), three irradiation tests with mini-plates are on the way at the High-flux Advanced Neutron Application Reactor (HANARO). The first test among three HANARO Mini-Plate Irradiation tests (HAMP-1, 2, 3) has completed. PLATE code has been initially developed to analyze the thermal performance of high density U-Mo/Al dispersion fuel plates during irradiation [1]. We upgraded the PLATE code with the latest irradiation results which were implemented by corrosion, thermal conductivity and swelling model. Fuel performance analysis for HAMP-1 was conducted with updated PLATE. This paper presents results of performance evaluation of the HAMP-1. Maximum fuel temperature was obtained 136 .deg., which is far below the preset limit of 200 .deg. for the irradiation test. The meat swelling and corrosion thickness was also confirmed that the developed fuel would behave as anticipated.

  7. 40 CFR 60.58b - Compliance and performance testing.

    Science.gov (United States)

    2010-07-01

    ... accuracy requirement). (5) The quality assurance procedures of appendix F of this part except for section 5.1.1 (relative accuracy test audit) shall apply to the monitor. (6) If carbon dioxide is selected for... related activities for the purpose of improving facility performance or advancing the state-of-the-art for...

  8. Honeywell Cascade Distiller System Performance Testing Interim Results

    Science.gov (United States)

    Callahan, Michael R.; Sargusingh, Miriam

    2014-01-01

    The ability to recover and purify water through physiochemical processes is crucial for realizing long-term human space missions, including both planetary habitation and space travel. Because of their robust nature, distillation systems have been actively pursued as one of the technologies for water recovery. The Cascade Distillation System (CDS) is a vacuum rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. The CDS was previously under development through Honeywell and NASA. In 2009, an assessment was performed to collect data to support down-selection and development of a primary distillation technology for application in a lunar outpost water recovery system. Based on the results of this testing, an expert panel concluded that the CDS showed adequate development maturity, TRL-4, together with the best product water quality and competitive weight and power estimates to warrant further development. The Advanced Exploration Systems (AES) Water Recovery Project (WRP) worked to address weaknesses identified by The Panel; namely bearing design and heat pump power efficiency. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades. The CDS will also have been challenged with ISS analog waste streams and a subset of those being considered for Exploration architectures. This paper details interim results of the AES WRP CDS performance testing.

  9. Performance test of solar-assisted ejector cooling system

    KAUST Repository

    Huang, Bin-Juine; Ton, Wei-Zhe; Wu, Chen-Chun; Ko, Hua-Wei; Chang, Hsien-Shun; Hsu, Hang-Yuen; Liu, Jen-Hao; Wu, Jia-Hung; Yen, Rue-Her

    2014-01-01

    are developed in SACH-k2, including generator liquid level control in ECS, the ECS evaporator temperature control, and optimal control of fan power in cooling tower of ECS. From the field test results, the generator liquid level control performs quite well

  10. Modelling of LOCA Tests with the BISON Fuel Performance Code

    Energy Technology Data Exchange (ETDEWEB)

    Williamson, Richard L [Idaho National Laboratory; Pastore, Giovanni [Idaho National Laboratory; Novascone, Stephen Rhead [Idaho National Laboratory; Spencer, Benjamin Whiting [Idaho National Laboratory; Hales, Jason Dean [Idaho National Laboratory

    2016-05-01

    BISON is a modern finite-element based, multidimensional nuclear fuel performance code that is under development at Idaho National Laboratory (USA). Recent advances of BISON include the extension of the code to the analysis of LWR fuel rod behaviour during loss-of-coolant accidents (LOCAs). In this work, BISON models for the phenomena relevant to LWR cladding behaviour during LOCAs are described, followed by presentation of code results for the simulation of LOCA tests. Analysed experiments include separate effects tests of cladding ballooning and burst, as well as the Halden IFA-650.2 fuel rod test. Two-dimensional modelling of the experiments is performed, and calculations are compared to available experimental data. Comparisons include cladding burst pressure and temperature in separate effects tests, as well as the evolution of fuel rod inner pressure during ballooning and time to cladding burst. Furthermore, BISON three-dimensional simulations of separate effects tests are performed, which demonstrate the capability to reproduce the effect of azimuthal temperature variations in the cladding. The work has been carried out in the frame of the collaboration between Idaho National Laboratory and Halden Reactor Project, and the IAEA Coordinated Research Project FUMAC.

  11. Comparative study on implementation of management requires from ABNT NBR ISO/IEC 17025

    International Nuclear Information System (INIS)

    Suplino Filho, Carlos Alberto Lucas; Souza, Luciane de Rezende; Oliveira, Estela Maria de

    2014-01-01

    This work was developed in order to emphasize the importance of laboratory management system in the direction and control of the company or institute with regard to the quality of delivery of ionizing radiation service to society. It was developed a comparative study of managerial points of Deming with the managerial requirements of ISO / IEC 17025, which found that the difficulties of the laboratories indicated by nonconformities tracked during audits, are related to specific points cited by Deming. (author)

  12. ISO/IEC 17025 laboratory accreditation of NRC Acoustical Standards Program

    Science.gov (United States)

    Wong, George S. K.; Wu, Lixue; Hanes, Peter; Ohm, Won-Suk

    2004-05-01

    Experience gained during the external accreditation of the Acoustical Standards Program at the Institute for National Measurement Standards of the National Research Council is discussed. Some highlights include the preparation of documents for calibration procedures, control documents with attention to reducing future paper work and the need to maintain documentation or paper trails to satisfy the external assessors. General recommendations will be given for laboratories that are contemplating an external audit in accordance to the requirements of ISO/IEC 17025.

  13. Post-test analysis for the APR1400 LBLOCA DVI performance test using MARS

    International Nuclear Information System (INIS)

    Bae, Kyoo Hwan; Lee, Y. J.; Kim, H. C.; Bae, Y. Y.; Park, J. K.; Lee, W.

    2002-03-01

    Post-test analyses using a multi-dimensional best-estimate analysis code, MARS, are performed for the APR1400 LBLOCA DVI (Direct Vessel Injection) performance tests. This report describes the code evaluation results for the test data of various void height tests and direct bypass tests that have been performed at MIDAS test facility. MIDAS is a scaled test facility of APR1400 with the objective of identifying multi-dimensional thermal-hydraulic phenomena in the downcomer during the reflood conditions of a large break LOCA. A modified linear scale ratio was applied in its construction and test conditions. The major thermal-hydraulic parameters such as ECC bypass fraction, steam condensation fraction, and temperature distributions in downcomer are compared and evaluated. The evaluation results of MARS code for the various test cases show that: (a) MARS code has an advanced modeling capability of well predicting major multi-dimensional thermal-hydraulic phenomena occurring in the downcomer, (b) MARS code under-predicts the steam condensation rates, which in turn causes to over-predict the ECC bypass rates. However, the trend of decrease in steam condensation rate and increase in ECC bypass rate in accordance with the increase in steam flow rate, and the calculation results of the ECC bypass rates under the EM analysis conditions generally agree with the test data

  14. Upgrading IEC strategy: the happy family coupon campaign.

    Science.gov (United States)

    Alberto, C S

    1976-01-01

    The Information, Education and Communication Division of the Family Planning Organization of the Philippines launched a Happy Family Coupon Campaign, a project to test the feasibility and the potential of a scheme whereby materials were distributed in response to individuals' expressed needs and interest. The project aims were: 1) to reach specific target groups, represented by readers of commercially printed materials; 2) to explore the potential of the mail system as a medium for the distribution of family planning materials; 3) to test the effectiveness of commercial publications as a vehicle for creating demand for family planning information; and 4) to secure feedback regarding preferences for the various family planning materials. The campaign had 2 major components: 1) advertising as a means of informing readers about the availability of certain family planning information materils, and 2) mail service as a channel for delivering requested materials to the respondents. 12 types of informational materials were distributed, each written in English, Filipino, and the Ilocano, Cebuano, and Ilongo dialects. These pamphlets and leaflets are described. The campaign drew a total of 24,226 respondents from August 1974 to December 1975. 58.7% of the respondents had 1-4 children, 26.4% had 5 or more children, and the remaining 14.9% gave no information concerning the number of children. It appears that the project has already achieved a measure of success as indicated by: 1) specific target groups were reached, 2) the potential of the mail system as a channel for the distribution of family planning was not confined to the buyers of the publications, 3) the potential of commercial publications as vehicles for creating demand for family planning information was tested, and 4) feedback regarding preferences of various groups for different family planning materials was obtained.

  15. SP-100 Fuel Pin Performance: Results from Irradiation Testing

    Science.gov (United States)

    Makenas, Bruce J.; Paxton, Dean M.; Vaidyanathan, Swaminathan; Marietta, Martin; Hoth, Carl W.

    1994-07-01

    A total of 86 experimental fuel pins with various fuel, liner, and cladding candidate materials have been irradiated in the Experimental Breeder Reactor-II (EBR-II) and the Fast Flux Test Facility (FFTF) reactor as part of the SP-100 fuel pin irradiation testing program. Postirradiation examination results from these fuel pins are key in establishing performance correlations and demonstrating the lifetime and safety of the reactor fuel system. This paper provides a brief description of the in-reactor fuel pin tests and presents the most recent irradiation data on the performance of wrought rhenium (Re) liner material and high density UN fuel at goal burnup of 6 atom percent (at. %). It also provides an overview of the significant variety of other fuel/liner/cladding combinations which were irradiated as part of this program and which may be of interest to more advanced efforts.

  16. Walk test and school performance in mouth-breathing children.

    Science.gov (United States)

    Boas, Ana Paula Dias Vilas; Marson, Fernando Augusto de Lima; Ribeiro, Maria Angela Gonçalves de Oliveira; Sakano, Eulália; Conti, Patricia Blau Margosian; Toro, Adyléia Dalbo Contrera; Ribeiro, José Dirceu

    2013-01-01

    In recent decades, many studies on mouth breathing (MB) have been published; however, little is known about many aspects of this syndrome, including severity, impact on physical and academic performances. Compare the physical performance in a six minutes walk test (6MWT) and the academic performance of MB and nasal-breathing (NB) children and adolescents. This is a descriptive, cross-sectional, and prospective study with MB and NB children submitted to the 6MWT and scholar performance assessment. We included 156 children, 87 girls (60 NB and 27 MB) and 69 boys (44 NB and 25 MB). Variables were analyzed during the 6MWT: heart rate (HR), respiratory rate, oxygen saturation, distance walked in six minutes and modified Borg scale. All the variables studied were statistically different between groups NB and MB, with the exception of school performance and HR in 6MWT. MB affects physical performance and not the academic performance, we noticed a changed pattern in the 6MWT in the MB group. Since the MBs in our study were classified as non-severe, other studies comparing the academic performance variables and 6MWT are needed to better understand the process of physical and academic performances in MB children.

  17. Maturity index on reliability: covering non-technical aspects of IEC61508 reliability certification

    International Nuclear Information System (INIS)

    Brombacher, A.C.

    1999-01-01

    One of the more recent developments in the field of reliability and safety is the realisation that these aspects are not only a function of the product itself, but also of the organisation realising this product. A second development is a trend from an often predominantly qualitative analysis towards a quantitative analysis. In contrast to the (older) DIN 0801, the (more recent) IEC61508 requires, on product level, also a quantitative analysis and, on organisational level, an assessment of the lifecycle of a product by analysing the (maturity of the) relevant business processes (DIN V VDE 0801. Grundsaetze fuer Rechner in Systemen mit Sicherheitsaufgaben, 1990; DIN V 0801. Grundlegende Sicherheitsbetrachtungen fuer MSR-Schutzeinrichtungen, 1994; DIN V VDE 0801 A1. Grundsaetze fuer Rechner in Systemen mit Sicherheitsaufgaben, Aenderung A1, 1994; IEC 61508 Functional Safety of electrical/electronic/programmable electronic safety-related systems, draft 4.0, 1997). The IEC standard 61508 covers: (i) technical aspects, both on a quantitative and a qualitative level; (ii) organisational aspects, both on aspects of maturity of business processes (quantitative) and on aspects of the definition and application of procedures (qualitative). This paper shows the necessity for an analysis on all aspects in a safety certification process, and presents an overview of the available tools and techniques for the various quadrants. As methods and tools for especially quadrant C are currently unavailable, this paper will propose a method to assess and improve the maturity of an organisation on reliability management: the maturity index on reliability (MIR)

  18. Clock Face Drawing Test Performance in Children with ADHD

    Directory of Open Access Journals (Sweden)

    Ahmad Ghanizadeh

    2013-01-01

    Full Text Available  Introduction: The utility and discriminatory pattern of the clock face drawing test in ADHD is unclear. This study therefore compared Clock Face Drawing test performance in children with ADHD and controls.   Material & methods: 95 children with ADHD and 191 school children were matched for gender ratio and age. ADHD symptoms severities were assessed using DSM-IV ADHD checklist and their intellectual functioning was assessed. The participants completed three clock-drawing tasks, and the following four functions were assessed: Contour score, Numbers score, Hands setting score, and Center score    Results: All the subscales scores of the three clock drawing tests of the ADHD group were lower than that of the control group. In ADHD children, inattention and hyperactivity/impulsivity scores were not related with free drawn clock test scores. When pre-drawn contour test was performed, inattentiveness score was statistically associated with Number score. None of the other variables of age, gender, intellectual functioning, and hand use preference were associated with Numbers score. In pre-drawn clock, no association of ADHD symptoms with any CDT subscales was significant. In addition, more errors are observed with free drawn clock and Pre-drawn contour than pre-drawn clock.    Conclusion: Putting Numbers and Hands setting are more sensitive measures to screen ADHD than Contour and Center drawing. Test performance, except Hands setting, may have already reached a developmental plateau. It is probable that Hand setting deficit in children with ADHD may not decrease from age 8 to 14 years. Performance of children with ADHD is associated with the complexity of CDT.

  19. Clock face drawing test performance in children with ADHD.

    Science.gov (United States)

    Ghanizadeh, Ahmad; Safavi, Salar; Berk, Michael

    2013-01-01

    The utility and discriminatory pattern of the clock face drawing test in ADHD is unclear. This study therefore compared Clock Face Drawing test performance in children with ADHD and controls. 95 school children with ADHD and 191 other children were matched for gender ratio and age. ADHD symptoms severities were assessed using DSM-IV ADHD checklist and their intellectual functioning was assessed. The participants completed three clock-drawing tasks, and the following four functions were assessed: Contour score, Numbers score, Hands setting score, and Center score. All the subscales scores of the three clock drawing tests of the ADHD group were lower than that of the control group. In ADHD children, inattention and hyperactivity/ impulsivity scores were not related to free drawn clock test scores. When pre-drawn contour test was performed, inattentiveness score was statistically associated with Number score while none of the other variables of age, gender, intellectual functioning, and hand use preference were associated with that kind of score. In pre-drawn clock, no association of ADHD symptoms with any CDT subscales found significant. In addition, more errors are observed with free drawn clock and Pre-drawn contour than pre-drawn clock. Putting Numbers and Hands setting are more sensitive measures to screen ADHD than Contour and Center drawing. Test performance, except Hands setting, may have already reached a developmental plateau. It is probable that Hand setting deficit in children with ADHD may not decrease from age 8 to 14 years. Performance of children with ADHD is associated with complexity of CDT.

  20. Differences in gender performance on competitive physics selection tests

    Science.gov (United States)

    Wilson, Kate; Low, David; Verdon, Matthew; Verdon, Alix

    2016-12-01

    [This paper is part of the Focused Collection on Gender in Physics.] We have investigated gender differences in performance over the past eight years on the Australian Science Olympiad Exam (ASOE) for physics, which is taken by nearly 1000 high school students each year. The ASOE, run by Australian Science Innovations (ASI), is the initial stage of the process of selection of teams to represent Australia at the Asian and International Physics Olympiads. Students taking the exam are generally in their penultimate year of school and selected by teachers as being high performing in physics. Together with the overall differences in facility, we have investigated how the content and presentation of multiple-choice questions (MCQs) affects the particular answers selected by male and female students. Differences in the patterns of responses by male and female students indicate that males and females might be modeling situations in different ways. Some strong patterns were found in the gender gaps when the questions were categorized in five broad dimensions: content, process required, difficulty, presentation, and context. Almost all questions saw male students performing better, although gender differences were relatively small for questions with a more abstract context. Male students performed significantly better on most questions with a concrete context, although notable exceptions were found, including two such questions where female students performed better. Other categories that showed consistently large gaps favoring male students include questions with projectile motion and other two-dimensional motion or forces content, and processes involving interpreting diagrams. Our results have important implications, suggesting that we should be able to reduce the gender gaps in performance on MCQ tests by changing the way information is presented and setting questions in contexts that are less likely to favor males over females. This is important as MCQ tests are

  1. Differences in gender performance on competitive physics selection tests

    Directory of Open Access Journals (Sweden)

    Kate Wilson

    2016-08-01

    Full Text Available [This paper is part of the Focused Collection on Gender in Physics.] We have investigated gender differences in performance over the past eight years on the Australian Science Olympiad Exam (ASOE for physics, which is taken by nearly 1000 high school students each year. The ASOE, run by Australian Science Innovations (ASI, is the initial stage of the process of selection of teams to represent Australia at the Asian and International Physics Olympiads. Students taking the exam are generally in their penultimate year of school and selected by teachers as being high performing in physics. Together with the overall differences in facility, we have investigated how the content and presentation of multiple-choice questions (MCQs affects the particular answers selected by male and female students. Differences in the patterns of responses by male and female students indicate that males and females might be modeling situations in different ways. Some strong patterns were found in the gender gaps when the questions were categorized in five broad dimensions: content, process required, difficulty, presentation, and context. Almost all questions saw male students performing better, although gender differences were relatively small for questions with a more abstract context. Male students performed significantly better on most questions with a concrete context, although notable exceptions were found, including two such questions where female students performed better. Other categories that showed consistently large gaps favoring male students include questions with projectile motion and other two-dimensional motion or forces content, and processes involving interpreting diagrams. Our results have important implications, suggesting that we should be able to reduce the gender gaps in performance on MCQ tests by changing the way information is presented and setting questions in contexts that are less likely to favor males over females. This is important as MCQ

  2. The common information model CIM IEC 61968/61970 and 62325 : a practical introduction to the CIM

    CERN Document Server

    Uslar, Mathias; Rohjans, Sebastian; Trefke, Jörn; Vasquez Gonzalez, Jose Manuel

    2012-01-01

    Within the Smart Grid, the combination of automation equipment, communication technology and IT is crucial. Interoperability of devices and systems can be seen as the key enabler of smart grids. Therefore, international initiatives have been started in order to identify interoperability core standards for Smart Grids.   IEC 62357, the so called Seamless Integration Architecture, is one of these very core standards, which has been identified by recent Smart Grid initiatives and roadmaps to be essential for building and managing intelligent power systems. The Seamless Integration Architecture provides an overview of the interoperability and relations between further standards from IEC TC 57 like the IEC 61970/61968: Common Information Model - CIM.   CIM has proven to be a mature standard for interoperability and engineering; consequently, it is a cornerstone of the IEC Smart Grid Standardization Roadmap. This book provides an overview on how the CIM developed, in which international projects and roadmaps is h...

  3. Performance test for implantation of a primary standard of low energy X-ray beams

    International Nuclear Information System (INIS)

    Cardoso, Ricardo de Souza; Bossio, Francisco; Peixoto, Jose Guilherme P.

    2005-01-01

    The implementation of a standard laboratory of calibration chambers that will serve to radiotherapy activities, radiodiagnosis and radioprotection, depends on the knowledge of physical and dosimetric parameters that characterize the quality of the radiation beam. With the aim of verifying the reliability of the ionizing free-air chamber with variable volume manufactured by Victoreen Instruments, model 481, as a primary standard, a study of the performance of the chamber to x-rays qualities of low energy was developed in this work. These qualities are the ones recommended by 'Bureau International des Poids et Mesures' - BIPM, for daily routine of the calibration service performed by the 'Laboratorio Nacional de Metrologia das Radiacoes Ionizantes - LNMRI/IRD, for calibration of this secondary standard chambers that serve to the control in hospitals, clinics and industries. The results obtained at the present work show that the Victoreen chamber model 481 behaves as a primary standard, being easy to handle and having simple mechanical construction, and showing an expanded uncertainty equal to 0,26%, regarding the quality of the radiation beam of 30 kV. However, some of the equipment used at the present study need to be submitted to a strict routine calibration, in order for the laboratory to be in accordance with the recommendations of the standard ABNT -NBR ISO/IEC 17025 (2003). (author)

  4. MOTIVATION AND PERFORMANCE IN PHYSICAL EDUCATION: AN EXPERIMENTAL TEST

    Directory of Open Access Journals (Sweden)

    Juan A. Moreno

    2010-03-01

    Full Text Available The purpose of this study was to analyse, experimentally, the relationships between motivation and performance in a lateral movement test in physical education. The study group consisted of 363 students (227 boys and 136 girls, aged between 12 and 16, who were randomly divided into three groups: an experimental group in which an incremental ability belief was induced, another experimental group in which an entity ability belief was induced, and a control group where there was no intervention. Measurements were made of situational intrinsic motivation, perceived competence in executing the task and performance. The results revealed that the incremental group reported higher scores on the situational intrinsic motivation scale. The entity group demonstrated better performance in the first test attempt than the incremental group but, in the second attempt, the performance was similar in the different groups. Perhaps the initial differences in performance disappeared because the incremental group counted on improving in the second attempt. These results are discussed in relation to the intensity with which the teacher conveys information relating to incremental ability belief of the pupil to increase intrinsic motivation and performance

  5. Predicting neuropsychological test performance on the basis of temporal orientation.

    Science.gov (United States)

    Ryan, Joseph J; Glass, Laura A; Bartels, Jared M; Bergner, CariAnn M; Paolo, Anthony M

    2009-05-01

    Temporal orientation is often disrupted in the context of psychiatric or neurological disease; tests assessing this function are included in most mental status examinations. The present study examined the relationship between scores on the Temporal Orientation Scale (TOS) and performance on a battery of tests that assess memory, language, and cognitive functioning in a sample of patients with Alzheimer's disease (N = 55). Pearson-product moment correlations showed that, in all but two instances, the TOS was significantly correlated with each neuropsychological measure, p values < or = .05. Also, severely disoriented (i.e., TOS score < or = -8) patients were consistently 'impaired' on memory tests but not on tests of language and general cognitive functioning.

  6. Using ISO/IEC 12207 to analyze open source software development processes: an E-learning case study

    OpenAIRE

    Krishnamurthy, Aarthy; O'Connor, Rory

    2013-01-01

    peer-reviewed To date, there is no comprehensive study of open source software development process (OSSDP) carried out for open source (OS) e-learning systems. This paper presents the work which objectively analyzes the open source software development (OSSD) practices carried out by e-learning systems development communities and their results are represented using DEMO models. These results are compared using ISO/IEC 12207:2008. The comparison of DEMO models with ISO/IEC...

  7. Raven's Test Performance of Sub-Saharan Africans: Average Performance, Psychometric Properties, and the Flynn Effect

    Science.gov (United States)

    Wicherts, Jelte M.; Dolan, Conor V.; Carlson, Jerry S.; van der Maas, Han L. J.

    2010-01-01

    This paper presents a systematic review of published data on the performance of sub-Saharan Africans on Raven's Progressive Matrices. The specific goals were to estimate the average level of performance, to study the Flynn Effect in African samples, and to examine the psychometric meaning of Raven's test scores as measures of general intelligence.…

  8. Performance testing of supercapacitors: Important issues and uncertainties

    Science.gov (United States)

    Zhao, Jingyuan; Gao, Yinghan; Burke, Andrew F.

    2017-09-01

    Supercapacitors are a promising technology for high power energy storage, which have been used in some industrial and vehicles applications. Hence, it is important that information concerning the performance of supercapacitors be detailed and reliable so system designers can make rational decisions regarding the selection of the energy storage components. This paper is concerned with important issues and uncertainties regarding the performance testing of supercapacitors. The effect of different test procedures on the measured characteristics of both commercial and prototype supercapacitors including hybrid supercapacitors have been studied. It was found that the test procedure has a relatively minor effect on the capacitance of carbon/carbon devices and a more significant effect on the capacitance of hybrid supercapacitors. The device characteristic with the greatest uncertainty is the resistance and subsequently the claimed power capability of the device. The energy density should be measured by performing constant power discharges between appropriate voltage limits. This is particularly important in the case of hybrid supercapacitors for which the energy density is rate dependent and the simple relationship E = ½CV2 does not yield accurate estimates of the energy stored. In general, most of the important issues for testing carbon/carbon devices become more serious for hybrid supercapacitors.

  9. Performance test of a ceramic turbo-viscous pump

    International Nuclear Information System (INIS)

    Abe, Tetsuya; Hiroki, Seiji; Murakami, Yoshio; Shiraishi, Shigeyuki; Totoura, Sadayuki; Ohtaki, Takashi.

    1994-01-01

    In the special fields of nuclear fusion facilities and semiconductor production installation, the development of new vacuum pumps which can cope with strong magnetic fields, high temperature gas and corrosive gas is demanded. Mitsubishi Heavy Industries Ltd. has advanced the development of ceramic turbo-molecular pumps and ceramic turbo-viscous pumps, which use ceramic rotors and gas bearings since 1985. The evaluation test of the ceramic turbo-viscous vacuum pump CT-3000H which can evacuate from atmospheric pressure to high vacuum with one pump was carried out, and the experimental results on the performance and the reliability were obtained, therefore, those are reported in this paper. The structure, specification and features of the CT-3000H are shown. The exhaust performance test of the pump was carried out in conformity with the standard of the Vacuum Society of Japan, JVIS 005 'Method of performance test for turbo-molecular pumps'. The gases used were nitrogen and helium. The results are shown. The exhaust test from atmospheric pressure was carried out by two methods, and the results are shown. (K.I.)

  10. Multiphase pumping: indoor performance test and oilfield application

    Science.gov (United States)

    Kong, Xiangling; Zhu, Hongwu; Zhang, Shousen; Li, Jifeng

    2010-03-01

    Multiphase pumping is essentially a means of adding energy to the unprocessed effluent which enables the liquid and gas mixture to be transported over a long distances without prior separation. A reduction, consolidation, or elimination of the production infrastructure, such as separation equipments and offshore platforms can be developed more economically. Also it successfully lowed the backpressure of wells, revived dead wells and improved the production and efficiency of oilfield. This paper reviews the issues related to indoor performance test and an oilfield application of the helico-axial multiphase pump designed by China University of Petroleum (Beijing). Pump specification and its hydraulic design are given. Results of performance testing under different condition, such as operational speed and gas volume fraction (GVF) etc are presented. Experimental studies on combination of theoretical analysis showed the multiphase pump satisfies the similitude rule, which can be used in the development of new MPP design and performance prediction. Test results showed that rising the rotation speed and suction pressure could better its performance, pressure boost improved, high efficiency zone expanding and the flow rate related to the optimum working condition increased. The pump worked unstable as GVF increased to a certain extent and slip occurred between two phases in the pump, creating surging and gas lock at a high GVF. A case of application in Nanyang oilfield is also studied.

  11. Hydrogen Field Test Standard: Laboratory and Field Performance

    Science.gov (United States)

    Pope, Jodie G.; Wright, John D.

    2015-01-01

    The National Institute of Standards and Technology (NIST) developed a prototype field test standard (FTS) that incorporates three test methods that could be used by state weights and measures inspectors to periodically verify the accuracy of retail hydrogen dispensers, much as gasoline dispensers are tested today. The three field test methods are: 1) gravimetric, 2) Pressure, Volume, Temperature (PVT), and 3) master meter. The FTS was tested in NIST's Transient Flow Facility with helium gas and in the field at a hydrogen dispenser location. All three methods agree within 0.57 % and 1.53 % for all test drafts of helium gas in the laboratory setting and of hydrogen gas in the field, respectively. The time required to perform six test drafts is similar for all three methods, ranging from 6 h for the gravimetric and master meter methods to 8 h for the PVT method. The laboratory tests show that 1) it is critical to wait for thermal equilibrium to achieve density measurements in the FTS that meet the desired uncertainty requirements for the PVT and master meter methods; in general, we found a wait time of 20 minutes introduces errors methods, respectively and 2) buoyancy corrections are important for the lowest uncertainty gravimetric measurements. The field tests show that sensor drift can become a largest component of uncertainty that is not present in the laboratory setting. The scale was calibrated after it was set up at the field location. Checks of the calibration throughout testing showed drift of 0.031 %. Calibration of the master meter and the pressure sensors prior to travel to the field location and upon return showed significant drifts in their calibrations; 0.14 % and up to 1.7 %, respectively. This highlights the need for better sensor selection and/or more robust sensor testing prior to putting into field service. All three test methods are capable of being successfully performed in the field and give equivalent answers if proper sensors without drift are

  12. Wafer-level radiometric performance testing of uncooled microbolometer arrays

    Science.gov (United States)

    Dufour, Denis G.; Topart, Patrice; Tremblay, Bruno; Julien, Christian; Martin, Louis; Vachon, Carl

    2014-03-01

    A turn-key semi-automated test system was constructed to perform on-wafer testing of microbolometer arrays. The system allows for testing of several performance characteristics of ROIC-fabricated microbolometer arrays including NETD, SiTF, ROIC functionality, noise and matrix operability, both before and after microbolometer fabrication. The system accepts wafers up to 8 inches in diameter and performs automated wafer die mapping using a microscope camera. Once wafer mapping is completed, a custom-designed quick insertion 8-12 μm AR-coated Germanium viewport is placed and the chamber is pumped down to below 10-5 Torr, allowing for the evaluation of package-level focal plane array (FPA) performance. The probe card is electrically connected to an INO IRXCAM camera core, a versatile system that can be adapted to many types of ROICs using custom-built interface printed circuit boards (PCBs). We currently have the capability for testing 384x288, 35 μm pixel size and 160x120, 52 μm pixel size FPAs. For accurate NETD measurements, the system is designed to provide an F/1 view of two rail-mounted blackbodies seen through the Germanium window by the die under test. A master control computer automates the alignment of the probe card to the dies, the positioning of the blackbodies, FPA image frame acquisition using IRXCAM, as well as data analysis and storage. Radiometric measurement precision has been validated by packaging dies measured by the automated probing system and re-measuring the SiTF and Noise using INO's pre-existing benchtop system.

  13. Test objects for evaluating the performance of radiological imaging systems. Leeds radiological test objects

    International Nuclear Information System (INIS)

    Cowen, A.R.; Clarke, O.F.; Haywood, J.M.; Parker, R.P.

    1985-01-01

    A range of test objects has been developed to assess the imaging performance of conventional and digital radiological imaging systems. These test objects have arisen as a result of involvement in both the laboratory evaluation of radiological imaging systems and the routine maintenance of such equipment in a large diagnostic radiology department. The philosophy behind the design and application of the test objects is briefly described. Particular attention is paid to the advantages of using the threshold-contrast detail-detectability technique to assess overall imaging performance. The great importance of ensuring optimum imaging performance prior to clinical acceptance is stressed. A strategy for implementing the test objects in a clinical department is present. The diagnostic information content of the clinical images which result measures the success of the quality control procedure adopted. (author)

  14. Agility in Team Sports: Testing, Training and Factors Affecting Performance.

    Science.gov (United States)

    Paul, Darren J; Gabbett, Tim J; Nassis, George P

    2016-03-01

    Agility is an important characteristic of team sports athletes. There is a growing interest in the factors that influence agility performance as well as appropriate testing protocols and training strategies to assess and improve this quality. The objective of this systematic review was to (1) evaluate the reliability and validity of agility tests in team sports, (2) detail factors that may influence agility performance, and (3) identify the effects of different interventions on agility performance. The review was undertaken in accordance with the Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines. We conducted a search of PubMed, Google Scholar, Science Direct, and SPORTDiscus databases. We assessed the methodological quality of intervention studies using a customized checklist of assessment criteria. Intraclass correlation coefficient values were 0.80-0.91, 0.10-0.81, and 0.81-0.99 for test time using light, video, and human stimuli. A low-level reliability was reported for youth athletes using the video stimulus (0.10-0.30). Higher-level participants were shown to be, on average, 7.5% faster than their lower level counterparts. Reaction time and accuracy, foot placement, and in-line lunge movement have been shown to be related to agility performance. The contribution of strength remains unclear. Efficacy of interventions on agility performance ranged from 1% (vibration training) to 7.5% (small-sided games training). Agility tests generally offer good reliability, although this may be compromised in younger participants responding to various scenarios. A human and/or video stimulus seems the most appropriate method to discriminate between standard of playing ability. Decision-making and perceptual factors are often propositioned as discriminant factors; however, the underlying mechanisms are relatively unknown. Research has focused predominantly on the physical element of agility. Small-sided games and video training may offer effective

  15. 1997 Performance Testing of Multi-Metal Continuous Emissions Monitors

    International Nuclear Information System (INIS)

    1998-01-01

    Five prototype and two commercially available multi-metals continuous emissions monitors (CEMs) were tested in September 1997 at the Rotary Kiln Incinerator Simulator facility at the EPA National Risk Management Research Laboratory, Research Triangle Park, North Carolina. The seven CEMs were tested side by side in a long section of duct following the secondary combustion chamber of the RKIS. Two different concentrations of six toxic metals were introduced into the incinerator-approximately 15 and 75 g/dscm of arsenic, beryllium, cadmium, chromium, lead, and mercury (We also tested for antimony but we are not reporting on it here because EPA recently dropped antimony from the list of metals addressed by the draft MACT rule). These concentrations were chosen to be close to emission standards in the draft MACT rule and the estimated Method Detection Limit (MDL) required of a CEM for regulatory compliance purposes. Results from this test show that no CEMs currently meet the performance specifications in the EPA draft MACT rule for hazardous waste incinerators. Only one of the CEMs tested was able to measure all six metals at the concentrations tested. Even so, the relative accuracy of this CEM varied between 35% and 100%, not 20% or less as required in the EPA performance specification. As a result, we conclude that no CEM is ready for long-term performance validation for compliance monitoring applications. Because sampling and measuring Hg is a recurring problem for multi-metal CEMs as well as Hg CEMs, we recommended that developers participate in a 1998 DOE-sponsored workshop to solve these and other common CEM measurement issues

  16. Comparison of driving simulator performance and neuropsychological testing in narcolepsy.

    Science.gov (United States)

    Kotterba, Sylvia; Mueller, Nicole; Leidag, Markus; Widdig, Walter; Rasche, Kurt; Malin, Jean-Pierre; Schultze-Werninghaus, Gerhard; Orth, Maritta

    2004-09-01

    Daytime sleepiness and cataplexy can increase automobile accident rates in narcolepsy. Several countries have produced guidelines for issuing a driving license. The aim of the study was to compare driving simulator performance and neuropsychological test results in narcolepsy in order to evaluate their predictive value regarding driving ability. Thirteen patients with narcolepsy (age: 41.5+/-12.9 years) and 10 healthy control patients (age: 55.1+/-7.8 years) were investigated. By computer-assisted neuropsychological testing, vigilance, alertness and divided attention were assessed. In a driving simulator patients and controls had to drive on a highway for 60 min (mean speed of 100 km/h). Different weather and daytime conditions and obstacles were presented. Epworth Sleepiness Scale-Scores were significantly raised (narcolepsy patients: 16.7+/-5.1, controls: 6.6+/-3.6, P divided attention (56.9+/-25.4) and vigilance (58.7+/-26.8) were in a normal range. There was, however, a high inter-individual difference. There was no correlation between driving performance and neuropsychological test results or ESS Score. Neuropsychological test results did not significantly change in the follow-up. The difficulties encountered by the narcolepsy patient in remaining alert may account for sleep-related motor vehicle accidents. Driving simulator investigations are closely related to real traffic situations than isolated neuropsychological tests. At the present time the driving simulator seems to be a useful instrument judging driving ability especially in cases with ambiguous neuropsychological results.

  17. Rheological Method for Alpha Test Evaluation of Developing Superplasticizers’ Performance: Channel Flow Test

    Directory of Open Access Journals (Sweden)

    Jae Hong Kim

    2017-01-01

    Full Text Available Advance in high-range water-reducing admixture revolutionizes the workability and constructability of conventional vibrated concrete as well as self-consolidating concrete. Its need from construction fields has increased, and consequently a variety of new-type polycarboxylates, base polymers for the admixture, are being formulated in these days. Synthesizing new polymers needs a quick, but reliable, test to evaluate its performance on concrete. The test is also asked for selecting the best applicable brand of them before a test concrete will be mixed. This paper proposes a “channel flow test” and its usage for the purpose. The proposed procedure for the test includes the mix proportion of a test mortar, the test method, and rheological interpretation of the test results.

  18. A LABORATORY TEST FOR THE EXAMINATION OF ALACTIC RUNNING PERFORMANCE

    Directory of Open Access Journals (Sweden)

    Armin Kibele

    2005-12-01

    Full Text Available A new testing procedure is introduced to evaluate the alactic running performance in a 10s sprint task with near-maximal movement velocity. The test is performed on a motor-equipped treadmill with inverted polarity that increases mechanical resistance instead of driving the treadmill belt. As a result, a horizontal force has to be exerted against the treadmill surface in order to overcome the resistant force of the engine and to move the surface in a backward direction. For this task, subjects lean with their hands towards the front safety barrier of the treadmill railing with a slightly inclined body posture. The required skill resembles the pushing movement of bobsleigh pilots at the start of a race. Subjects are asked to overcome this mechanical resistance and to cover as much distance as possible within a time period of 10 seconds. Fifteen male students (age: 27.7 ± 4.1 years, body height: 1.82 ± 0.46 m, body mass: 78.3 ± 6.7 kg participated in a study. As the resistance force was set to 134 N, subjects ran 35.4 ± 2.6 m on the average corresponding to a mean running velocity of 3.52 ± 0.25 m·s-1. The validity of the new test was examined by statistical inference with various measures related to alactic performance including a metabolic equivalent to estimate alactic capacity (2892 ± 525 mL O2, an estimate for the oxygen debt (2662 ± 315 ml, the step test by Margaria to estimate alactic energy flow (1691 ± 171 W, and a test to measure the maximal strength in the leg extensor muscles (2304 ± 351 N. The statistical evaluation showed that the new test is in good agreement with the theoretical assumptions for alactic performance. Significant correlation coefficients were found between the test criteria and the measures for alactic capacity (r = 0.79, p < 0.01 as well as alactic power (r = 0.77, p < 0.01. The testing procedure is easy to administer and it is best suited to evaluate the alactic capacity for bobsleigh pilots as well as for

  19. Performance of CREAM Calorimeter Results of Beam Tests

    CERN Document Server

    Ahn, H S; Beatty, J J; Bigongiari, G; Castellina, A; Childers, J T; Conklin, N B; Coutu, S; Duvernois, M A; Ganel, O; Han, J H; Hyun, H J; Kang, T G; Kim, H J; Kim, K C; Kim, M Y; Kim, T; Kim, Y J; Lee, J K; Lee, M H; Lutz, L; Maestro, P; Malinine, A; Marrocchesi, P S; Mognet, S I; Nam, S W; Nutter, S; Park, N H; Park, H; Seo, E S; Sina, R; Syed, S; Song, C; Swordy, S; Wu, J; Yang, J; Zhang, H Q; Zei, R; Zinn, S Y

    2005-01-01

    The Cosmic Ray Energetics And Mass (CREAM), a balloon-borne experiment, is under preparation for a flight in Antarctica at the end of 2004. CREAM is planned to measure the energy spectrum and composition of cosmic rays directly at energies between 1 TeV and 1000 TeV. Incident particle energies will be measured by a transition radiation detector and a sampling calorimeter. The calorimeter was constructed at the University of Maryland and tested at CERN in 2003. Performance of the calorimeter during the beam tests is reported.

  20. Thermal performance test for steam turbine of nuclear power plants

    International Nuclear Information System (INIS)

    Bu Yubing; Xu Zongfu; Wang Shiyong

    2014-01-01

    Through study of steam turbine thermal performance test of CPR1000 nuclear power plant, we solve the enthalpy calculation problems of the steam turbine in wet steam zone using heat balance method which can help to figure out the real overall heat balance diagram for the first time, and we develop a useful software for thermal heat balance calculation. Ling'ao phase II as an example, this paper includes test instrument layout, system isolation, risk control, data acquisition, wetness measurement, heat balance calculation, etc. (authors)

  1. Reliability performance of standby equipment with periodic testing

    International Nuclear Information System (INIS)

    Sim, S.H.

    1985-11-01

    In this report, the reliability performance of standby equipment subjected to periodic testing is studied. analytical expressions have been derived for reliability measures, such as the man accumulated operating time to failure, the expected number of tests between two consecutive failures, the mean time to failure following an emergency start-up and the probability of failing to complete an emergency mission of a specified duration. These results are useful for the reliability assessment of standby equipment such as combustion turbine units of the emergency power supply system, and of the Class III power system at a nuclear generating station

  2. Results of tritium tests performed on Sandia Laboratories decontamination system

    International Nuclear Information System (INIS)

    Gildea, P.D.; Wall, W.R.; Gede, V.P.

    1978-05-01

    The Tritium Research Laboratory (TRL), a facility for performing experiments using gram amounts of tritium, became operational on October 1, 1977. As secondary containment, the TRL employs sealed glove boxes connected on demand to two central decontamination systems, the Gas Purification System and the Vacuum Effluent Recovery System. Performance tests on these systems show the tritium removal systems can achieve concentration reduction factors (ratio of inlet to exhaust concentrations) much in excess of 1000 per pass at inlet concentrations of 1 part per million or less for both tritium and tritiated methane

  3. Can trained lay providers perform HIV testing services? A review of national HIV testing policies.

    Science.gov (United States)

    Flynn, David E; Johnson, Cheryl; Sands, Anita; Wong, Vincent; Figueroa, Carmen; Baggaley, Rachel

    2017-01-04

    Only an estimated 54% of people living with HIV are aware of their status. Despite progress scaling up HIV testing services (HTS), a testing gap remains. Delivery of HTS by lay providers may help close this testing gap, while also increasing uptake and acceptability of HIV testing among key populations and other priority groups. 50 National HIV testing policies were collated from WHO country intelligence databases, contacts and testing program websites. Data regarding lay provider use for HTS was extracted and collated. Our search had no geographical or language restrictions. This data was then compared with reported data from the Global AIDS Response Progress Reporting (GARPR) from July 2015. Forty-two percent of countries permit lay providers to perform HIV testing and 56% permit lay providers to administer pre-and post-test counseling. Comparative analysis with GARPR found that less than half (46%) of reported data from countries were consistent with their corresponding national HIV testing policy. Given the low uptake of lay provider use globally and their proven use in increasing HIV testing, countries should consider revising policies to support lay provider testing using rapid diagnostic tests.

  4. Performance Testing of Tracer Gas and Tracer Aerosol Detectors for use in Radionuclide NESHAP Compliance Testing

    Energy Technology Data Exchange (ETDEWEB)

    Fuehne, David Patrick [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Lattin, Rebecca Renee [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-06-28

    The Rad-NESHAP program, part of the Air Quality Compliance team of LANL’s Compliance Programs group (EPC-CP), and the Radiation Instrumentation & Calibration team, part of the Radiation Protection Services group (RP-SVS), frequently partner on issues relating to characterizing air flow streams. This memo documents the most recent example of this partnership, involving performance testing of sulfur hexafluoride detectors for use in stack gas mixing tests. Additionally, members of the Rad-NESHAP program performed a functional trending test on a pair of optical particle counters, comparing results from a non-calibrated instrument to a calibrated instrument. Prior to commissioning a new stack sampling system, the ANSI Standard for stack sampling requires that the stack sample location must meet several criteria, including uniformity of tracer gas and aerosol mixing in the air stream. For these mix tests, tracer media (sulfur hexafluoride gas or liquid oil aerosol particles) are injected into the stack air stream and the resulting air concentrations are measured across the plane of the stack at the proposed sampling location. The coefficient of variation of these media concentrations must be under 20% when evaluated over the central 2/3 area of the stack or duct. The instruments which measure these air concentrations must be tested prior to the stack tests in order to ensure their linear response to varying air concentrations of either tracer gas or tracer aerosol. The instruments used in tracer gas and aerosol mix testing cannot be calibrated by the LANL Standards and Calibration Laboratory, so they would normally be sent off-site for factory calibration by the vendor. Operational requirements can prevent formal factory calibration of some instruments after they have been used in hazardous settings, e.g., within a radiological facility with potential airborne contamination. The performance tests described in this document are intended to demonstrate the reliable

  5. Performance testing of 3D point cloud software

    Science.gov (United States)

    Varela-González, M.; González-Jorge, H.; Riveiro, B.; Arias, P.

    2013-10-01

    LiDAR systems are being used widely in recent years for many applications in the engineering field: civil engineering, cultural heritage, mining, industry and environmental engineering. One of the most important limitations of this technology is the large computational requirements involved in data processing, especially for large mobile LiDAR datasets. Several software solutions for data managing are available in the market, including open source suites, however, users often unknown methodologies to verify their performance properly. In this work a methodology for LiDAR software performance testing is presented and four different suites are studied: QT Modeler, VR Mesh, AutoCAD 3D Civil and the Point Cloud Library running in software developed at the University of Vigo (SITEGI). The software based on the Point Cloud Library shows better results in the loading time of the point clouds and CPU usage. However, it is not as strong as commercial suites in working set and commit size tests.

  6. Investigation of Concrete Electrical Resistivity As a Performance Based Test

    OpenAIRE

    Malakooti, Amir

    2017-01-01

    The purpose of this research project was to identify the extent that concrete resistivity measurements (bulk and/or surface) can be used as a performance based lab test to improve the quality of concrete in Utah bridge decks. By allowing UDOT to specify a required resistivity, concrete bridge deck quality will increase and future maintenance costs will decrease. This research consisted of two phases: the field phase and the lab phase. In the field phase, concrete samples were gathered from...

  7. Performance test of the CMS link alignment system

    CERN Document Server

    Arce, P; Calvo, E; Fernández, M G; Ferrando, A; Figueroa, C F; García, N; Josa-Mutuberria, I; Molinero, A; Oller, J C; Rodrigo, T; Vila, I; Virto, A L

    2002-01-01

    A first global test of the CMS Alignment System was performed at the I4 hall of the CERN ISR tunnel. Positions of the network, reproducing a set of points in the CMS detector monitored by the Link System, were reconstructed and compared to survey measurements. Spatial and angular reconstruction precisions reached in the present experimental set-up are already close to the CMS requirements.

  8. Development of Testing Methodologies to Evaluate Postflight Locomotor Performance

    Science.gov (United States)

    Mulavara, A. P.; Peters, B. T.; Cohen, H. S.; Richards, J. T.; Miller, C. A.; Brady, R.; Warren, L. E.; Bloomberg, J. J.

    2006-01-01

    Crewmembers experience locomotor and postural instabilities during ambulation on Earth following their return from space flight. Gait training programs designed to facilitate recovery of locomotor function following a transition to a gravitational environment need to be accompanied by relevant assessment methodologies to evaluate their efficacy. The goal of this paper is to demonstrate the operational validity of two tests of locomotor function that were used to evaluate performance after long duration space flight missions on the International Space Station (ISS).

  9. Testing the performance of a blind burst statistic

    Energy Technology Data Exchange (ETDEWEB)

    Vicere, A [Istituto di Fisica, Universita di Urbino (Italy); Calamai, G [Istituto Nazionale di Fisica Nucleare, Sez. Firenze/Urbino (Italy); Campagna, E [Istituto Nazionale di Fisica Nucleare, Sez. Firenze/Urbino (Italy); Conforto, G [Istituto di Fisica, Universita di Urbino (Italy); Cuoco, E [Istituto Nazionale di Fisica Nucleare, Sez. Firenze/Urbino (Italy); Dominici, P [Istituto di Fisica, Universita di Urbino (Italy); Fiori, I [Istituto di Fisica, Universita di Urbino (Italy); Guidi, G M [Istituto di Fisica, Universita di Urbino (Italy); Losurdo, G [Istituto Nazionale di Fisica Nucleare, Sez. Firenze/Urbino (Italy); Martelli, F [Istituto di Fisica, Universita di Urbino (Italy); Mazzoni, M [Istituto Nazionale di Fisica Nucleare, Sez. Firenze/Urbino (Italy); Perniola, B [Istituto di Fisica, Universita di Urbino (Italy); Stanga, R [Istituto Nazionale di Fisica Nucleare, Sez. Firenze/Urbino (Italy); Vetrano, F [Istituto di Fisica, Universita di Urbino (Italy)

    2003-09-07

    In this work, we estimate the performance of a method for the detection of burst events in the data produced by interferometric gravitational wave detectors. We compute the receiver operating characteristics in the specific case of a simulated noise having the spectral density expected for Virgo, using test signals taken from a library of possible waveforms emitted during the collapse of the core of type II supernovae.

  10. Performance of a 2-megawatt high voltage test load

    International Nuclear Information System (INIS)

    Horan, D.; Kustom, R.; Ferguson, M.

    1995-01-01

    A high-power, water-cooled resistive load which simulates the electrical load characteristics of a high-power klystron, capable of 2 megawatts dissipation at 95 kV DC, was built and installed at the Advanced Photon Source for use in load-testing high voltage power supplies. During this testing, the test load has logged approximately 35 hours of operation at power levels in excess of one mezawatt. Slight variations in the resistance of the load during operation indicate that leakage currents in the cooling water may be a significant factor affecting the performance of the load. Sufficient performance data have been collected to indicate that leakage current through the deionized (DI) water coolant shunts roughly 15 percent of the full-load current around the load resistor elements. The leakage current could cause deterioration of internal components of the load. The load pressure vessel was disassembled and inspected internally for any signs of significant wear and distress. Results of this inspection and possible modifications for improved performance will be discussed

  11. Achievement test performance in children conceived by IVF.

    Science.gov (United States)

    Mains, L; Zimmerman, M; Blaine, J; Stegmann, B; Sparks, A; Ansley, T; Van Voorhis, B

    2010-10-01

    Long-term follow-up studies of children conceived by IVF are limited. We examine academic performance on standardized tests [Iowa Tests of Basic Skills/Educational Development (ITBS/ITED)] of children conceived by IVF. Parents of children 8-17 years of age at the onset of the study (March 2008) who were conceived by IVF at the University of Iowa Hospitals and Clinics and living in the state of Iowa were contacted by mail. Parents completed questionnaires on their child's health and education and parental education. ITBS/ITED scores from school grades 3-12 were obtained on IVF children and a group of anonymous children matched by grade, year, gender and school district. Scores were analyzed using linear mixed models. Four hundred and ninety-seven couples were contacted. Two hundred and ninety-five couples (463 children) agreed to participate (59.4% of parents), with ITBS/ITED scores available on 423 children (91.4% of participants). IVF children scored higher than the national mean (P divorce and child's BMI. Cryopreservation, length of embryo culture and method of insemination did not affect scores. IVF children scored higher on standardized tests than their matched peers, suggesting that IVF does not have a negative effect on cognitive development. However, long-term follow-up of IVF children is still limited. Further research should be performed on the effect of multiple gestation on academic performance.

  12. Results of performance tests on polymer zirconium compound (PZC)

    International Nuclear Information System (INIS)

    Sombrito, Elvira Z.; Bulos, Adelina DM.

    2006-01-01

    Three batches of polyzirconium compound (PZC) consisting of nine samples were tested for its application as column material for adsorbing reactor-produced molybdenum-99 ( 99 Mo). Using low specific activity molybdenum solution (∼500 μCi/267 mg Mo), the adsorption capacity, elution yield, elution volume and molybdenum breakthrough were measured. The average adsorption capacity of the nine samples is 239 ± 17 mg Mo/g PZC. The elution yield values obtained are lower than previously obtained and averaged at 47% with 30% variability. Molybdenum breakthrough also exceeded the limits for 99m Tc eluates. Considering the better performance of 2002 PZC samples, the samples may have undergone some changes during storage (tests were performed in December 2003) and/or the adsorption process did not conform to the recommended procedure. If this were the case, it demonstrated the importance of strictly following the recommended protocol. Relative values showed that the last two batches (PZC 030718 and PC 030726) performed better than the first batch in terms of elution yield and elution profile. These two batches exhibited amorphous structure as seen by x-ray diffraction analysis of the PZC test samples. (author)

  13. Test Program for the Performance Analysis of DNS64 Servers

    Directory of Open Access Journals (Sweden)

    Gábor Lencse

    2015-09-01

    Full Text Available In our earlier research papers, bash shell scripts using the host Linux command were applied for testing the performance and stability of different DNS64 server imple­mentations. Because of their inefficiency, a small multi-threaded C/C++ program (named dns64perf was written which can directly send DNS AAAA record queries. After the introduction to the essential theoretical background about the structure of DNS messages and TCP/IP socket interface programming, the design decisions and implementation details of our DNS64 performance test program are disclosed. The efficiency of dns64perf is compared to that of the old method using bash shell scripts. The result is convincing: dns64perf can send at least 95 times more DNS AAAA record queries per second. The source code of dns64perf is published under the GNU GPLv3 license to support the work of other researchers in the field of testing the performance of DNS64 servers.

  14. Fuel leak testing performance at NPP Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Slugen, V.; Krnac, S.; Smiesko, I.

    1995-01-01

    The NPP Bohunice VVER-440 fuel leak testing experience are relatively extensive in comparison with other VVER-440 users. As the first Europe NPP was adapted Siemens (KWU) in core-sipping equipment to VVER-440 units and since this time were have done these tests also for NPP Paks (Hungary) and NPP Dukovany (Czech Republic). The occurrence of leaking fuel assemblies in NPP is in the last 5 years relatively stabilised and low. A significant difference can be observed between type V-230 (31 leaks) and type V-213 (1 leak). None of of the indicated leaking fuel assemblies has been investigated in the hot cell. Therefore cannot be confirm the effective causes of leak occurrence. Nevertheless, the fuel failure rate and the performance of leak testing in NPP Bohunice are comparable to the world standard at PWR's. 1 tab., 2 figs., 3 refs

  15. Fuel leak testing performance at NPP Jaslovske Bohunice

    Energy Technology Data Exchange (ETDEWEB)

    Slugen, V; Krnac, S [Slovak Technical Univ., Bratislava (Slovakia); Smiesko, I [Nuclear Powr Plant EBO, Jaslovske Bohuce (Slovakia)

    1996-12-31

    The NPP Bohunice VVER-440 fuel leak testing experience are relatively extensive in comparison with other VVER-440 users. As the first Europe NPP was adapted Siemens (KWU) in core-sipping equipment to VVER-440 units and since this time were have done these tests also for NPP Paks (Hungary) and NPP Dukovany (Czech Republic). The occurrence of leaking fuel assemblies in NPP is in the last 5 years relatively stabilised and low. A significant difference can be observed between type V-230 (31 leaks) and type V-213 (1 leak). None of of the indicated leaking fuel assemblies has been investigated in the hot cell. Therefore cannot be confirm the effective causes of leak occurrence. Nevertheless, the fuel failure rate and the performance of leak testing in NPP Bohunice are comparable to the world standard at PWR`s. 1 tab., 2 figs., 3 refs.

  16. Can the Immune System Perform a t-Test?

    Science.gov (United States)

    Faria, Bruno Filipe; Mostardinha, Patricia

    2017-01-01

    The self-nonself discrimination hypothesis remains a landmark concept in immunology. It proposes that tolerance breaks down in the presence of nonself antigens. In strike contrast, in statistics, occurrence of nonself elements in a sample (i.e., outliers) is not obligatory to violate the null hypothesis. Very often, what is crucial is the combination of (self) elements in a sample. The two views on how to detect a change seem challengingly different and it could seem difficult to conceive how immunological cellular interactions could trigger responses with a precision comparable to some statistical tests. Here it is shown that frustrated cellular interactions reconcile the two views within a plausible immunological setting. It is proposed that the adaptive immune system can be promptly activated either when nonself ligands are detected or self-ligands occur in abnormal combinations. In particular we show that cellular populations behaving in this way could perform location statistical tests, with performances comparable to t or KS tests, or even more general data mining tests such as support vector machines or random forests. In more general terms, this work claims that plausible immunological models should provide accurate detection mechanisms for host protection and, furthermore, that investigation on mechanisms leading to improved detection in “in silico” models can help unveil how the real immune system works. PMID:28046042

  17. Evaluation of the central libraries information security management at governmental universities located in Tehran, according to the international standard ISO/IEC 27002

    Directory of Open Access Journals (Sweden)

    Milad Malekolkalami

    2014-02-01

    Full Text Available This study assessed the evaluation of information security management status in central Libraries of governmental universities located in Tehran, according to ISO / I.E.C. 27002. Research method applied for the study is descriptive Survey and a questionnaire was used for collecting information. The questionnaire was distributed between the 74 central library managers of governmental universities in Tehran according to the recent list on the website of Ministry of Science, Research and Technology, that includes 39 components based on 11 indicators of the standard ISO/ I.E.C. 27002. Analysis of data has been done by using both descriptive and inferential statistics by Microsoft Excel 2007and SPSS statistical softwares. The results of research showed that the mean for libraries in 11 indexes are as follows: The mean for the first index, Security policy, is 3.91 , in the second index, organization of information security, is 4.23, in the third index, asset security management, is 4.38, in the fourth index, Human Resources Security management, is 4, in the fifth index, physical and environment Security management, is 4.07, in the sixth index, operations management and communications, is 4.15, in the Seventh index, access controls management, is 4.38, in the eighth index, information system acquisition, development and maintenance, is 3.92, in the ninth index, information security incident management, is 3.84, in the tenth index, business continuity management, is 3.46, in the eleventh index, compliance, is 3.69 that match with the standard ISO / IEC. 27002. The results of Research shown that totally mean for standard ISO/I.E.C. 27002 in the field of information security management in the central libraries, is 4 being in a good condition and there is no significant differences between the performance of the Central libraries of the governmental Universities in Tehran, since It is not observed significant difference between them in the field of

  18. Small-scale tunnel test for blast performance

    International Nuclear Information System (INIS)

    Felts, J E; Lee, R J

    2014-01-01

    The data reported here provide a validation of a small-scale tunnel test as a tool to guide the optimization of new explosives for blast performance in tunnels. The small-scale arrangement consisted of a 2-g booster and 10-g sample mounted at the closed end of a 127 mm diameter by 4.6-m long steel tube with pressure transducers along its length. The three performance characteristics considered were peak pressure, initial energy release, and impulse. The relative performance from five explosives was compared to that from a 1.16-m diameter by 30-m long tunnel that used 2.27-kg samples. The peak pressure values didn't correlate between the tunnels. Partial impulse for the explosives did rank similarly. The initial energy release was determined from a one-dimensional point-source analysis, which nearly tracked with impulse suggesting additional energy released further down the tunnel for some explosives. This test is a viable tool for optimizing compositional variations for blast performance in target scenarios of similar geometry.

  19. Performance measurements at the fast flux test facility

    International Nuclear Information System (INIS)

    Baumhardt, R.J.; Newland, D.J.; Praetorius, P.R.

    1987-01-01

    In 1984, Fast Flux Test Facility (FFTF) management recognized the need to develop a measurement system that would quantify the operational performance of the FFTF and the human resources needed to operate it. Driven by declining budgets and the need to safely manage a manpower rampdown at FFTF, an early warning system was developed. Although the initiating event for the early warning system was the need to safely manage a manpower rampdown, many related uses have evolved. The initial desired objective for the FFTF performance measurements was to ensure safety and control of key performance trends. However, the early warning system has provided a more quantitative, supportable basis upon which to make decisions. From this initial narrow focus, efforts in the FFTF plant and supporting organizations are leading to measurement of and, subsequently, improvements in productivity. Pilot projects utilizing statistical process control have started with longer range productivity improvement

  20. Pilot test of ANSI draft standard N13.29 environmental dosimetry -- Performance criteria for testing

    International Nuclear Information System (INIS)

    Klemic, G.; Shebell, P.; Monetti, M.; Raccah, F.; Sengupta, S.

    1998-09-01

    American National Standards Institute Draft N13.29 describes performance tests for environmental radiation dosimetry providers. If approved it would be the first step toward applying the types of performance testing now required in personnel dosimetry to environmental radiation monitoring. The objective of this study was to pilot test the draft standard, before it undergoes final balloting, on a small group of dosimetry providers that were selected to provide a mix of facility types, thermoluminescent dosimeter designs and monitoring program applications. The first phase of the pilot test involved exposing dosimeters to laboratory photon, beta, and x-ray sources at routine and accident dose levels. In the second phase, dosimeters were subjected to ninety days of simulated environmental conditions in an environmental chamber that cycled through extremes of temperature and humidity. Two out of seven participants passed all categories of the laboratory testing phase, and all seven passed the environmental test phase. While some relatively minor deficiencies were uncovered in the course of the pilot test, the results show that draft N13.29 describes useful tests that could be appropriate for environmental dosimetry providers. An appendix to this report contains recommendations that should be addressed by the N13.29 working group before draft N13.29 is submitted for balloting

  1. Addendum to ''Test Plan: Small-Scale Seal Performance Tests (SSSPT)''

    International Nuclear Information System (INIS)

    Finley, R.E.

    1992-01-01

    This document describes activities that are intended to update the data base of fluid flow measurements made on expansive salt concrete (ESC) seals as part of the Small-Scale Seal Performance Tests (SSSPT). The original plans for the SSSPT experiments are described by Stormont (1985a and 1985b). These seals have previously been tested with brine and gas during the early stages (less than 450 days) after emplacement. The purpose of this Test Plan Addendum is to detail the activities necessary to, update the gas and brine measurements previously performed on the SSSPT Series A and Series B seals and to identify the key personnel responsible for implementing these activities. This addendum describes a limited undertaking and does NOT change the scope of the original test plan

  2. Carbohydrate ingestion improves performance of a new reliable test of soccer performance.

    Science.gov (United States)

    Currell, Kevin; Conway, Steve; Jeukendrup, Asker E

    2009-02-01

    The aim of the study was to investigate the reliability of a new test of soccer performance and evaluate the effect of carbohydrate (CHO) on soccer performance. Eleven university footballers were recruited and underwent 3 trials in a randomized order. Two of the trials involved ingesting a placebo beverage, and the other, a 7.5% maltodextrin solution. The protocol comprised a series of ten 6-min exercise blocks on an outdoor Astroturf pitch, separated by the performance of 2 of the 4 soccer-specific tests, making the protocol 90 min in duration. The intensity of the exercise was designed to be similar to the typical activity pattern during soccer match play. Participants performed skill tests of dribbling, agility, heading, and shooting throughout the protocol. The coefficients of variation for dribbling, agility, heading, and shooting were 2.2%, 1.2%, 7.0%, and 2.8%, respectively. The mean combined placebo scores were 42.4 +/- 2.7 s, 43.1 +/- 3.7 s, 210 +/- 34 cm, and 212 +/- 17 points for agility, dribbling, heading, and kicking, respectively. CHO ingestion led to a combined agility time of 41.5 +/- 0.8 s, for dribbling 41.7 +/- 3.5 s, 213 +/- 11 cm for heading, and 220 +/- 5 points for kicking accuracy. There was a significant improvement in performance for dribbling, agility, and shooting (p soccer performance, and ingesting CHO leads to an improvement in soccer performance.

  3. Testing of tactical performance in youth elite soccer.

    Science.gov (United States)

    Memmert, Daniel

    2010-01-01

    This is a twofold study with the goals of evaluating tactical oriented game test situations for 12-13-year old highly-talented soccer players and to analyze dynamic, intra-individual developments of the players. A cross-sectional design was carried in study 1, using game test situations to measure specific tactics and creative performance for 195 expert players. The results from five evaluation criteria show that both diagnostic instruments can be used for recording football-specific creativity and game intelligence in talented young players. They produced tactical indicators that can be described as objective and valid, exhibit a sufficient degree of differentiation and are easy to record. Study 2 uses a longitudinal design to present a dynamic performance diagnostic tool for analyzing intra-individual improvements of German Soccer Foundation talents according to football-specific creativity and game intelligence. The results with respect to divergent tactical thinking clearly show that very different change processes were observed in the German Soccer Foundation players. Finally, the practical implications for the training process are discussed on the basis of both studies. Key pointsWith game test situations it is possible to assess tactical performance as game intelligence and creativity objective, valid, with a sufficient degree of differentiation, and economically.The results with respect to game intelligence and creativity show that very different change processes were observed in the German Soccer Foundation players dependend on the bases (trainers).Current literature on tactics for school sports as well as for children's, youth and high performance soccer at the club level should place much more emphasis on individual and group-tactical requirements in soccer.

  4. HACIA LA EXTENSION DEL MÉTODO GRAY WATCH BASADO EN EL ESTÁNDAR DE CALIDAD ISO/IEC 25010 // TOWARDS THE EXTENSION OF THE GRAY WATCH METHOD BASED ON THE QUALITY STANDARD ISO/IEC 25010

    Directory of Open Access Journals (Sweden)

    Jorge Luis Pérez-Medina

    2012-06-01

    Full Text Available Talk about software quality implies the need to rely on parameters that should allow to establish the minimal levels that a product of this type must reach in order to be considered of quality. This paper aims to propose an extension of the method GRAY WATCH, specifically in the technical processes of Analysis and Design connecting the products obtained to the process of Implementation. The orientation of our proposal consists of using the standard of product quality ISO/IEC 25010, which establishes criteria for the specification of quality requirements of software products, their metrics and evaluation, and includes a quality model composed by characteristics and subcharacteristics. The result of this proposal, adds significant value to the extended method, Allowing to system analysts and Computer professionals to specify the precise activities to be performed to obtain quality requirements. To make this work we have supported our efforts in the Domain Engineering process based in Software Quality named InDoCaS as methodology for the definition of activities and products in the processes of Analysis, Design and Implementation of the Application.// RESUMEN: Hablar de calidad de software implica la necesidad de contar con parámetros que permitan establecer los niveles mínimos que un producto de este tipo debe alcanzar para que se considere de calidad. El presente articulo tiene como finalidad proponer una extension del método GRAY WATCH, especificamente en los procesos técnicos de análisis y diseño acoplando los productos obtenidos al proceso de implementación. La orientación de nuestra propuesta consiste en utilizar el estándar de calidad del producto ISO/IEC 25010, que establece criterios para la especificacion de requisitos de calidad de productos de software, sus métricas y su evaluación, e incluye un modelo de calidad compuesto por características y subcaracteristicas. El resultado de esta propuesta, agrega un valor importante al

  5. Wind Turbine Generator System Safety and Function Test Report for the Entegrity EW50 Wind Turbine

    Energy Technology Data Exchange (ETDEWEB)

    Smith, J.; Huskey, A.; Jager, D.; Hur, J.

    2012-11-01

    This report summarizes the results of a safety and function test that NREL conducted on the Entegrity EW50 wind turbine. This test was conducted in accordance with the International Electrotechnical Commissions' (IEC) standard, Wind Turbine Generator System Part 2: Design requirements for small wind turbines, IEC 61400-2 Ed.2.0, 2006-03.

  6. Test Methodologies for Hydrogen Sensor Performance Assessment: Chamber vs. Flow Through Test Apparatus: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Buttner, William J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hartmann, Kevin S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Schmidt, Kara [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cebolla, Rafeal O [Joint Research Centre, Petten, the Netherlands; Weidner, Eveline [Joint Research Centre, Petten, the Netherlands; Bonato, Christian [Joint Research Centre, Petten, the Netherlands

    2017-11-06

    Certification of hydrogen sensors to standards often prescribes using large-volume test chambers [1, 2]. However, feedback from stakeholders such as sensor manufacturers and end-users indicate that chamber test methods are often viewed as too slow and expensive for routine assessment. Flow through test methods potentially are an efficient, cost-effective alternative for sensor performance assessment. A large number of sensors can be simultaneously tested, in series or in parallel, with an appropriate flow through test fixture. The recent development of sensors with response times of less than 1s mandates improvements in equipment and methodology to properly capture the performance of this new generation of fast sensors; flow methods are a viable approach for accurate response and recovery time determinations, but there are potential drawbacks. According to ISO 26142 [1], flow through test methods may not properly simulate ambient applications. In chamber test methods, gas transport to the sensor can be dominated by diffusion which is viewed by some users as mimicking deployment in rooms and other confined spaces. Alternatively, in flow through methods, forced flow transports the gas to the sensing element. The advective flow dynamics may induce changes in the sensor behaviour relative to the quasi-quiescent condition that may prevail in chamber test methods. One goal of the current activity in the JRC and NREL sensor laboratories [3, 4] is to develop a validated flow through apparatus and methods for hydrogen sensor performance testing. In addition to minimizing the impact on sensor behaviour induced by differences in flow dynamics, challenges associated with flow through methods include the ability to control environmental parameters (humidity, pressure and temperature) during the test and changes in the test gas composition induced by chemical reactions with upstream sensors. Guidelines on flow through test apparatus design and protocols for the evaluation of

  7. Performance test for prototype game for children with adhd

    Science.gov (United States)

    Bahana, R.; Gaol, F. L.; Wiguna, T.; Hendric, S. W. H. L.; Soewito, B.; Nugroho, E.; Dirgantoro, B. P.; Abdurachman, E.

    2018-03-01

    The gaming industry has become one of the fastest growing industries in the world. In recent years there have been several studies that have used games, especially computer-based ones to improve the executive function of children with Attention Deficit Hyperactivity Disorder (ADHD) especially in working memory improvements. There are still several obstacles in using computer-based games that have been circulating today in Indonesia. The aim of this research is to develop and create a prototype game that can be used to improve working memory of children with ADHD using Bahasa Indonesia. The prototype game application is a race game with matching colors and memory work tasks; developed using Construct2. Players will play as a driver, delivering certain fruits to specific homes with different colors. The game also included visuospatial tasks such as remembering the objects. For performance test, CPU utilization, average FPS and image memory usage has been tested in several browsers. In conclusion, the performance tests results show that the first type of the prototype game is good enough to be played in desktop or laptop.

  8. Calibration and performance testing of electronic personal dosimeters (EPD)

    International Nuclear Information System (INIS)

    Banaga, H.A.

    2008-04-01

    In modern radiation protection practices, active personal dosimeters are becoming absolutely necessary operational tools for satisfying the ALARA principle. The aim of this work was to carry out calibration and performance testing of ten electronic personal dosimeters (EPD) used for the individual monitoring. The EPDs were calibrated in terms of operation radiation protection quantity, personal dose equivalent, Hp (10). Calibrations were carried out at three of x-ray beam qualities described in ISO 4037 namely 60, 100 and 150 kV in addition to Cs-137 gamma ray quality. The calibrations were performed using polymethylmethacrylate (PMMA) phantom with dimensions 20*20*15 cm 3 . Conversion coefficient Hp (10)/K air for the phantom was also calculated. The response and linearity of the dosimeter at the specified energies were also tested. The EPDs tested showed that the calibration coefficient ranged from 0.60 to 1.31 and an equivalent response for the specified energies that ranged from 0.76 to 1.67. The study demonstrated the possibility of using non standard phantom for calibrating dosimeters used for individual monitoring. The dosimeters under study showed a good response in all energies except the response in quality 100 kV. The linearity of the dosimeters was within ±15%, with the exception of the quality 100 kV where this limit was exceeded.(Author)

  9. Performance verification tests of JT-60SA CS model coil

    Energy Technology Data Exchange (ETDEWEB)

    Obana, Tetsuhiro, E-mail: obana.tetsuhiro@LHD.nifs.ac.jp [National Institute for Fusion Science, 322-6 Oroshi, Toki, Gifu 509-5292 (Japan); Murakami, Haruyuki [Japan Atomic Energy Agency, 801-1 Mukoyama, Naka, Ibaraki 311-0193 (Japan); Takahata, Kazuya; Hamaguchi, Shinji; Chikaraishi, Hirotaka; Mito, Toshiyuki; Imagawa, Shinsaku [National Institute for Fusion Science, 322-6 Oroshi, Toki, Gifu 509-5292 (Japan); Kizu, Kaname; Natsume, Kyohei; Yoshida, Kiyoshi [Japan Atomic Energy Agency, 801-1 Mukoyama, Naka, Ibaraki 311-0193 (Japan)

    2015-11-15

    Highlights: • The performance of the JT-60SA CS model coil was verified. • The CS model coil comprised a quad-pancake wound with a Nb{sub 3}Sn CIC conductor. • The CS model coil met the design requirements. - Abstract: As a final check of the coil manufacturing method of the JT-60 Super Advanced (JT-60SA) central solenoid (CS), we verified the performance of a CS model coil. The model coil comprised a quad-pancake wound with a Nb{sub 3}Sn cable-in-conduit conductor. Measurements of the critical current, joint resistance, pressure drop, and magnetic field were conducted in the verification tests. In the critical-current measurement, the critical current of the model coil coincided with the estimation derived from a strain of −0.62% for the Nb{sub 3}Sn strands. As a result, critical-current degradation caused by the coil manufacturing process was not observed. The results of the performance verification tests indicate that the model coil met the design requirements. Consequently, the manufacturing process of the JT-60SA CS was established.

  10. Exercise testing and hemodynamic performance in healthy elderly persons

    International Nuclear Information System (INIS)

    Hitzhusen, J.C.; Hickler, R.B.; Alpert, J.S.; Doherty, P.W.

    1984-01-01

    To determine the effect of age on cardiovascular performance, 39 healthy elderly men and women, 70 to 83 years old, underwent treadmill thallium-201 exercise perfusion imaging and radionuclide equilibrium angiography at rest and during supine bicycle exercise. Five volunteers who had a positive exercise thallium test response were excluded from the study. Radionuclide left ventricular ejection fraction, regional wall abnormalities, relative cardiac output, stroke volume, end-diastolic volume and end-systolic volume were measured. Seventy-four percent of the subjects maintained or increased their ejection fraction with exercise. With peak exercise, mean end-diastolic volume did not change, end-systolic volume decreased and cardiac output and stroke volume increased. Moreover, in 35% of the subjects, minor regional wall motion abnormalities developed during exercise. There was no significant difference in the response of men and women with regard to these variables. However, more women than men had difficulty performing bicycle ergometry because they had never bicycled before. Subjects who walked daily performed the exercise tests with less anxiety and with a smaller increase in heart rate and systolic blood pressure

  11. Performance norms for a rhesus monkey neuropsychological testing battery: acquisition and long-term performance.

    Science.gov (United States)

    Weed, M R; Taffe, M A; Polis, I; Roberts, A C; Robbins, T W; Koob, G F; Bloom, F E; Gold, L H

    1999-10-25

    A computerized behavioral battery based upon human neuropsychological tests (CANTAB, CeNeS, Cambridge, UK) has been developed to assess cognitive behaviors of rhesus monkeys. Monkeys reliably performed multiple tasks, providing long-term assessment of changes in a number of behaviors for a given animal. The overall goal of the test battery is to characterize changes in cognitive behaviors following central nervous system (CNS) manipulations. The battery addresses memory (delayed non-matching to sample, DNMS; spatial working memory, using a self-ordered spatial search task, SOSS), attention (intra-/extra-dimensional shift, ID/ED), motivation (progressive-ratio, PR), reaction time (RT) and motor coordination (bimanual task). As with human neuropsychological batteries, different tasks are thought to involve different neural substrates, and therefore performance profiles should assess function in particular brain regions. Monkeys were tested in transport cages, and responding on a touch sensitive computer monitor was maintained by food reinforcement. Parametric manipulations of several tasks demonstrated the sensitivity of performance to increases in task difficulty. Furthermore, the factors influencing difficulty for rhesus monkeys were the same as those shown to affect human performance. Data from this study represent performance of a population of healthy normal monkeys that will be used for comparison in subsequent studies of performance following CNS manipulations such as infection with simian immunodeficiency virus (NeuroAIDS) or drug administration.

  12. Performance testing of waste forms in a tuff environment

    International Nuclear Information System (INIS)

    Oversby, V.M.

    1983-11-01

    This paper describes experimental work conducted to establish the chemical composition of water which will have reacted with Topopah Spring Member tuff prior to contact with waste packages. The experimental program to determine the behavior of spent fuel and borosilicate glass in the presence of this water is then described. Preliminary results of experiments using spent fuel segments with defects in the Zircaloy cladding are presented. Some results from parametric testing of a borosilicate glass with tuff and 304L stainless steel are also discussed. Experiments conducted using Topopah Spring tuff and J-13 well water have been conducted to provide an estimate of the post-emplacement environment for waste packages in a repository at Yucca Mountain. The results show that emplacement of waste packages should cause only small changes in the water chemistry and rock mineralogy. The changes in environment should not have any detrimental effects on the performance of metal barriers or waste forms. The NNWSI waste form testing program has provided preliminary results related to the release rate of radionuclides from the waste package. Those results indicate that release rates from both spent fuel and borosilicate glass should be below 1 part in 10 5 per year. Future testing will be directed toward making release rate testing more closely relevant to site specific conditions. 17 references, 7 figures

  13. Gamma thermometer longevity test: Laguna Verde 2 instruments recent performance

    International Nuclear Information System (INIS)

    Cuevas V, G.; Avila N, A.; Calleros M, G.

    2013-10-01

    This paper is informative of the General Electric Hitachi and Global Nuclear Fuel - Americas are collaboration with Comision Federal de Electricidad in a longevity test of thermocouples as power monitoring devices. The test conclusions will serve for final engineering design in detailing the Automated Fixed In-core Probes for calibration of the Local Power Range Monitors (LPRMs) of the Economic Simplified Boiling Water Reactor. This paper introduces the collaboration description and some recent performance evaluation of the thermocouples that are sensitive to gamma radiation and are known generically as Gamma Thermometers (G T). The G Ts in Laguna Verde 2 are radially located inside six instrumentation tubes in the core and consist of seven thermocouples, four are aligned with the LPRM heights and three are axially located between LPRM heights. The Laguna Verde 2 G T test has become the longest test of thermocouples as power monitoring devices in a BWR industry history and confirms their reliability in terms of time-dependent small noise under steady state reactor conditions and good agreement against Traversing In-core Probes power measurements. (Author)

  14. Gamma thermometer longevity test: Laguna Verde 2 instruments recent performance

    Energy Technology Data Exchange (ETDEWEB)

    Cuevas V, G. [Global Nuclear Fuel, Americas, 3901 Castle Hayne Road, Wilmington, North Carolina (United States); Avila N, A.; Calleros M, G., E-mail: Gabriel.Cuevas-Vivas@gnf.com [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verda, Carretera Veracruz-Nautla Km 42.5, Alto Lucero, Veracruz (Mexico)

    2013-10-15

    This paper is informative of the General Electric Hitachi and Global Nuclear Fuel - Americas are collaboration with Comision Federal de Electricidad in a longevity test of thermocouples as power monitoring devices. The test conclusions will serve for final engineering design in detailing the Automated Fixed In-core Probes for calibration of the Local Power Range Monitors (LPRMs) of the Economic Simplified Boiling Water Reactor. This paper introduces the collaboration description and some recent performance evaluation of the thermocouples that are sensitive to gamma radiation and are known generically as Gamma Thermometers (G T). The G Ts in Laguna Verde 2 are radially located inside six instrumentation tubes in the core and consist of seven thermocouples, four are aligned with the LPRM heights and three are axially located between LPRM heights. The Laguna Verde 2 G T test has become the longest test of thermocouples as power monitoring devices in a BWR industry history and confirms their reliability in terms of time-dependent small noise under steady state reactor conditions and good agreement against Traversing In-core Probes power measurements. (Author)

  15. Test results of the SMES model coil. Pulse performance

    International Nuclear Information System (INIS)

    Hamajima, Takataro; Shimada, Mamoru; Ono, Michitaka

    1998-01-01

    A model coil for superconducting magnetic energy storage (SMES model coil) has been developed to establish the component technologies needed for a small-scale 100 kWh SMES device. The SMES model coil was fabricated, and then performance tests were carried out in 1996. The coil was successfully charged up to around 30 kA and down to zero at the same ramp rate of magnetic field experienced in a 100 kWh SMES device. AC loss in the coil was measured by an enthalpy method as parameters of ramp rate and flat top current. The results were evaluated by an analysis and compared with short-sample test results. The measured hysteresis loss is in good agreement with that estimated from the short-sample results. It was found that the coupling loss of the coil consists of two major coupling time constants. One is a short time constant of about 200 ms, which is in agreement with the test results of a short real conductor. The other is a long time constant of about 30 s, which could not be expected from the short sample test results. (author)

  16. Electrical performance characteristics of the SSC Accelerator System String Test

    International Nuclear Information System (INIS)

    Robinson, W.; Burgett, W.; Gannon, J.; Kraushaar, P.; Mcinturff, A.; Nehring, R.; Saladin, V.; Savord, T.; Sorrensen, G.; Smellie, R.; Tool, G.; Voy, D.

    1993-05-01

    The intent of the Accelerator System String Test (ASST) is to obtain data for model verification and information on the magnitudes of pressures and voltages encountered in an accelerator environment. The ASST milestone run was achieved during July and August, 1992 and consisted of demonstrating the accelerator components could be configured together as a system operating at full current. Following the milestone run, the string was warmed to counteract some design flaws that impeded the operational range. The string was again cooled to cryogenic temperatures in October, and a comprehensive power testing program was conducted through the end of January, 1993. This paper describes how the collider arc components operate in an accelerator environment during quenches induced by firing both strip heaters and spot heaters. Evaluation of the data illustrates how variations in the design parameters on magnets used in a string environment can impact system performance

  17. Performance Tests of CMSSW on the CernVM

    CERN Document Server

    Petek, Marko

    2012-01-01

    goal of allowing the execution of the experiment's software on different operating systems in an easy way for the users. To achieve this it makes use of Virtual Machine images consisting of a JEOS (Just Enough Operational System) Linux image, bundled with CVMFS, a distributed file system for software. This image can this be run with a proper virtualizer on most of the platforms available. It also aggressively caches data on the local user's machine so that it can operate disconnected from the network. CMS wanted to compare the performance of the CMS Software running in the virtualized environment with the same software running on a native Linux box. To answer this need a series of tests were made on a controlled environment during 2010-2011. This work presents the results of those tests.

  18. Design and Performance Test of Locking Curved-Nut

    Energy Technology Data Exchange (ETDEWEB)

    Cha, Min Cheol; Kang, Ho Sung; Kim, Do Yeop; Lee, Suk Yong; Lee, Eung Suk [Chungbuk Nat’l Univ., Cheongju (Korea, Republic of); Jeong, Hui Jong [Viblock Company, Cheongwon (Korea, Republic of)

    2017-03-15

    Many types of locking nut are commercializing in the various industries where has heavy vibration. Because Nut's loosing causes a serious accident. But the most locking nuts are too expensive as the complicate manufacturing process. In this study, we design the new type of locking nut, 'Curved-Nut' that is relatively simple making process. We study a relation between the elastic energy and the nut loosing mechanism. So it is analysed, the elastic energy of Curved-Nut comparing with the locking test. The Curved-Nut was manufactured on the commercial nut using a milling tool with horizontal cutting, one or two time under the nut. As the result, the more elastic energy the more prevent the loosing of the nut. We verified the performance of the loosing nut using the vibration testing equipment (NAS3350).

  19. Evaluation of the signal-to-noise ratio (SNR) in a CR system and establishment of RQR-M and RQA-M IEC reference radiations in mammography

    International Nuclear Information System (INIS)

    Rosado, Paulo H.G.; Nogueira, Maria S.; Dantas, Marcelino V.A.; Santana, Priscila do C.

    2009-01-01

    In this work, the radiation condition RQR-M e RQA-M of IEC were established in the Siemens Mammomat 3000 mammography equipment. The standard radiation condition are described in terms of: emitting target of molybdenum, percentage ripple not more that 4%, total filtration of 0,032 ± 0,002 mm of molybdenum and specific values of first half-value layer. The results show that the values of parameters were in the range that the IEC recommends. Only the RQAM-3 the value of CSR was not in agreement of the value recommend, and was necessary a additions of 0,1 mm Al in the x-ray tube. After this, the signal noise ratio (SNR) of de Computer radiography (CR) system was evaluated in the reference qualities of RQR-M e RQA-M. For SNR the RQR-M mode of exposure was done with both the 20 mAs and automatic one. To RQA-M the exposure was done with 100 mAs. The variations of the values of SNR were approximated 4%. The tests were done with CR model CR850 made from Kodak and 40 mm of PMMA. (author)

  20. A Modified T-Test for Football Referees to Test Agility, Quickness and Sprint Performances

    Science.gov (United States)

    Muniroglu, S.; Subak, E.

    2018-01-01

    The football referees perform many actions as jogging, running, sprinting, side steps and backward steps during a football match. Further, the football referees change match activities every 5-6 seconds. Many tests are being conducted to determine the physical levels and competences of football referees like 50 m running, 200 m running, 12 minutes…

  1. AULA virtual reality test as an attention measure: convergent validity with Conners' Continuous Performance Test.

    Science.gov (United States)

    Díaz-Orueta, Unai; Garcia-López, Cristina; Crespo-Eguílaz, Nerea; Sánchez-Carpintero, Rocío; Climent, Gema; Narbona, Juan

    2014-01-01

    The majority of neuropsychological tests used to evaluate attention processes in children lack ecological validity. The AULA Nesplora (AULA) is a continuous performance test, developed in a virtual setting, very similar to a school classroom. The aim of the present study is to analyze the convergent validity between the AULA and the Continuous Performance Test (CPT) of Conners. The AULA and CPT were administered correlatively to 57 children, aged 6-16 years (26.3% female) with average cognitive ability (IQ mean = 100.56, SD = 10.38) who had a diagnosis of attention deficit/hyperactivity disorder (ADHD) according to DSM-IV-TR criteria. Spearman correlations analyses were conducted among the different variables. Significant correlations were observed between both tests in all the analyzed variables (omissions, commissions, reaction time, and variability of reaction time), including for those measures of the AULA based on different sensorial modalities, presentation of distractors, and task paradigms. Hence, convergent validity between both tests was confirmed. Moreover, the AULA showed differences by gender and correlation to Perceptual Reasoning and Working Memory indexes of the WISC-IV, supporting the relevance of IQ measures in the understanding of cognitive performance in ADHD. In addition, the AULA (but not Conners' CPT) was able to differentiate between ADHD children with and without pharmacological treatment for a wide range of measures related to inattention, impulsivity, processing speed, motor activity, and quality of attention focus. Additional measures and advantages of the AULA versus Conners' CPT are discussed.

  2. Performance testing of a small vertical-axis wind turbine

    Energy Technology Data Exchange (ETDEWEB)

    Bravo, R.; Tullis, S.; Ziada, S. [McMaster Univ., Hamilton, ON (Canada). Dept. of Mechanical Engineering

    2007-07-01

    Full-scale wind tunnel testing of a prototype 3.5 kW vertical-axis wind turbine (VAWT) was conducted in a low speed wind tunnel in Ottawa. The tests were conducted to determine nominal power curves as well as the system's structural integrity, safety and operational characteristics. Dimensionless power curves were used to assess the relation between the wind turbine's rotary speed and the produced power for various wind speeds. Tests began at the lowest wind speed and revolutions per minute (RPM) and were gradually increased. A proximity sensor was used to determine the passing frequency of spaced bolts. The aerodynamic performance of the turbine was evaluated using a servo-controlled mechanical variable load with a disc brake calliper and electro-hydraulic servo-actuator. A load cell was used to measure torque produced by the turbine. An active closed loop speed control system was used to regulate the rotary speed of the turbine. The system used a high gain proportional control law to guarantee stability. Calculated power was based on the average rotary speed measurement. Results of the study suggested that the dimensional power performance of the turbine could be predicted from the curve for all rotary speeds and for wind speeds between 8 and 16 m/s. The maximum power coefficient of 0.3 occurred at a tip speed ratio of 1.6. Test results demonstrated that the turbine reached its rated power at 14 m/s. However, the range of tip speed ratios for power production were lower than the range for most other small VAWT. 2 refs., 3 figs.

  3. The VUV instrument SPICE for Solar Orbiter: performance ground testing

    Science.gov (United States)

    Caldwell, Martin E.; Morris, Nigel; Griffin, Douglas K.; Eccleston, Paul; Anderson, Mark; Pastor Santos, Carmen; Bruzzi, Davide; Tustain, Samuel; Howe, Chris; Davenne, Jenny; Grundy, Timothy; Speight, Roisin; Sidher, Sunil D.; Giunta, Alessandra; Fludra, Andrzej; Philippon, Anne; Auchere, Frederic; Hassler, Don; Davila, Joseph M.; Thompson, William T.; Schuehle, Udo H.; Meining, Stefan; Walls, Buddy; Phelan, P.; Dunn, Greg; Klein, Roman M.; Reichel, Thomas; Gyo, Manfred; Munro, Grant J.; Holmes, William; Doyle, Peter

    2017-08-01

    SPICE is an imaging spectrometer operating at vacuum ultraviolet (VUV) wavelengths, 70.4 - 79.0 nm and 97.3 - 104.9 nm. It is a facility instrument on the Solar Orbiter mission, which carries 10 science instruments in all, to make observations of the Sun's atmosphere and heliosphere, at close proximity to the Sun, i.e to 0.28 A.U. at perihelion. SPICE's role is to make VUV measurements of plasma in the solar atmosphere. SPICE is designed to achieve spectral imaging at spectral resolution >1500, spatial resolution of several arcsec, and two-dimensional FOV of 11 x16arcmins. The many strong constraints on the instrument design imposed by the mission requirements prevent the imaging performance from exceeding those of previous instruments, but by being closer to the sun there is a gain in spatial resolution. The price which is paid is the harsher environment, particularly thermal. This leads to some novel features in the design, which needed to be proven by ground test programs. These include a dichroic solar-transmitting primary mirror to dump the solar heat, a high in-flight temperature (60deg.C) and gradients in the optics box, and a bespoke variable-line-spacing grating to minimise the number of reflective components used. The tests culminate in the systemlevel test of VUV imaging performance and pointing stability. We will describe how our dedicated facility with heritage from previous solar instruments, is used to make these tests, and show the results, firstly on the Engineering Model of the optics unit, and more recently on the Flight Model. For the keywords, select up to 8 key terms for a search on your manuscript's subject.

  4. Alternate performance standard project: Interpreting the post-construction test

    International Nuclear Information System (INIS)

    Williamson, A.D.; McDonough, S.E.

    1993-01-01

    The paper describes the results of a project commissioned by the State of Florida, in cooperation with the US Environmental Protection Agency, as one portion of the Florida Radon Research Program (FRRP). The purpose of the FRRP is to provide technical support for a statewide Building Standard for Radon-Resistant Construction currently in the rulemaking process. In this case the information provides technical background for a post-construction radon test specified as a performance element of the code which accompanies the prescriptive alternative that does not incorporate active radon reduction systems

  5. Performance evaluation of the Solar Building Test Facility

    Science.gov (United States)

    Jensen, R. N.

    1981-01-01

    The general performance of the NASA Solar Building Test Facility (SBTF) and its subsystems and components over a four year operational period is discussed, and data are provided for a typical one year period. The facility consists of a 4645 sq office building modified to accept solar heated water for operation of an absorption air conditioner and a baseboard heating system. An adjoining 1176 sq solar flat plate collector field with a 114 cu tank provides the solar heated water. The solar system provided 57 percent of the energy required for heating and cooling on an annual basis. The average efficiency of the solar collectors was 26 percent over a one year period.

  6. Performance testing of thermal analysis codes for nuclear fuel casks

    International Nuclear Information System (INIS)

    Sanchez, L.C.

    1987-01-01

    In 1982 Sandia National Laboratories held the First Industry/Government Joint Thermal and Structural Codes Information Exchange and presented the initial stages of an investigation of thermal analysis computer codes for use in the design of nuclear fuel shipping casks. The objective of the investigation was to (1) document publicly available computer codes, (2) assess code capabilities as determined from their user's manuals, and (3) assess code performance on cask-like model problems. Computer codes are required to handle the thermal phenomena of conduction, convection and radiation. Several of the available thermal computer codes were tested on a set of model problems to assess performance on cask-like problems. Solutions obtained with the computer codes for steady-state thermal analysis were in good agreement and the solutions for transient thermal analysis differed slightly among the computer codes due to modeling differences

  7. WIPP [Waste Isolation Pilot Plant] test phase plan: Performance assessment

    International Nuclear Information System (INIS)

    1990-04-01

    The U.S. Department of Energy (DOE) is responsible for managing the disposition of transuranic (TRU) wastes resulting from nuclear weapons production activities of the United States. These wastes are currently stored nationwide at several of the DOE's waste generating/storage sites. The goal is to eliminate interim waste storage and achieve environmentally and institutionally acceptable permanent disposal of these TRU wastes. The Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico is being considered as a disposal facility for these TRU wastes. This document describes the first of the following two major programs planned for the Test Phase of WIPP: Performance Assessment -- determination of the long-term performance of the WIPP disposal system in accordance with the requirements of the EPA Standard; and Operations Demonstration -- evaluation of the safety and effectiveness of the DOE TRU waste management system's ability to emplace design throughput quantities of TRU waste in the WIPP underground facility. 120 refs., 19 figs., 8 tabs

  8. Testing of camera performance standards at steady and local overloading

    International Nuclear Information System (INIS)

    Keszthelyine Landori, S.; Adorjanne Farkas, M.; Csirik, J.

    1983-01-01

    Camera performance standards are usually given for low count rates and uniform irradiation. A conventional analog gamma camera system (Gamma MB 9100 manufactured under the know-how of Picker DC 4/12 in Hungary) was studied on the basis of the Picker test procedure and the NEMA standard system. Uniformity, linearity, spatial and energy resolution were measured at high count rates and uniform irradiation (steady overloading). Linearity was studied at local overloading. Linearity, spatial and energy resolution were measured by a 1024-channel analyzer-computer system of KFKI, Hungary. The data were evaluated on the basis of NEMA standards, while uniformity was measured by the Gamma data processing system and evaluated by special SEGAMS programs. Performance variations were studied between 7500 cps and 75.000 cps pulse rates. Spatial and energy resolution were influenced strongly, uniformity slightly by pulse rates, while linearity did not change at all. Linearity was not influenced even by local overloading. (author)

  9. Individual differences in infant fearfulness and cognitive performance: a testing, performance, or competence effect?

    Science.gov (United States)

    Rieser-Danner, Loretta A

    2003-02-01

    The author conducted 2 studies to examine the relations between infant fear and cognitive testing performance in 12-month-old infants. In Study 1, fear was assessed by using 2 standard temperament questionnaires and a laboratory-based, standardized stranger approach. Individual differences in cognitive development were assessed using the Object Permanence Scale of the Infant Psychological Development Scales (I. C. Uzgiris & J. M. Hunt, 1975). All 3 assessments of fear significantly predicted object permanence performance, with correlations ranging from -.32 to -.35. In Study 2, fear was assessed via a maternal report questionnaire, and habituation performance was assessed via a basic-level categorization task. Familiarity with the examiner and with the testing environment was manipulated to test for a familiarity influence on performance. Testing revealed individual differences in both fear and habituation. Results suggest that highly fearful infants required more trials to habituate and were less likely to meet the habituation criterion than infants who were less fearful. Methodological and conceptual implications of these results are discussed.

  10. The development and performance testing of a biodegradable scale inhibitor

    Energy Technology Data Exchange (ETDEWEB)

    Hardy, Julie; Fidoe, Steve; Jones, Chris

    2006-03-15

    The oil industry is currently facing severe restrictions concerning the discharge of oil field chemicals into the environment. Many commonly used materials in both topside and downhole applications are phased for substitution for use in the North Sea, and more will be identified. The development of biodegradable and low toxicity chemicals, which afford equal or improved efficacy, compared to conventional technology, available at a competitive price, is a current industry challenge. A range of biodegradable materials are increasingly available, however their limited performance can result in a restricted range of applications. This paper discusses the development and commercialization of a readily biodegradable scale inhibitor, ideal for use in topside applications. This material offers a broad spectrum of activity, notably efficiency against barium sulphate, calcium sulphate and calcium carbonate scales, in a range of water chemistries. A range of performance testing, compatibility, stability and OCNS dataset will be presented. Comparisons with commonly used chemicals have been made to identify the superior performance of this phosphate ester. This paper will discuss a scale inhibitor suitable for use in a variety of conditions which offers enhanced performance combined with a favourable biodegradation profile. This material is of great benefit to the industry, particularly in North Sea applications. (author) (tk)

  11. Analisis Sistem Manajemen Keamanan Informasi Menggunakan ISO/IEC 27001 : 2013 Serta Rekomendasi Model Sistem Menggunakan Data Flow Diagram pada Direktorat Sistem Informasi Perguruan Tinggi

    Directory of Open Access Journals (Sweden)

    Yuni Cintia Yuze

    2016-11-01

    Full Text Available The importance of information and the possible risk of disruption, therefore the universities need to designed and implemented of the information security.  One of the standards that can be used to analyze the level of information security in the organization is ISO/IEC 27001 : 2013 and this standard has been prepared to provide requirements for establishing, implementing, maintaining and continually improving an information security management system. The objective of this research is to measure the level of information security based on standard ISO/IEC 27001: 2013 and modeling systems for information security management. This research uses descriptive qualitative approach, data collection and validation techniques with tringulasi (interview, observation and documentation. Data was analyzed using gap analysis and to measure the level of maturity this research uses SSE-CMM (Systems Security Engineering Capability Maturity Model. Based on the research results, Maturity level clause Information Security Policy reaches level 1 (Performed-Informally, clause Asset Management reaches level 3 (Well-Defined, clause Access Control reaches level 3 (Well-Defined, clause Physical and Environmental Security reaches level 3 (Well-Defined, clause Operational Security reaches level 3 (Well-Defined, Communication Security clause reaches the level 2 (Planned and Tracked. Based on the results of maturity level discovery of some weakness in asset management in implementing the policy. Therefore, the modeling system using the flow map and CD / DFD focused on Asset Management System.

  12. Study on Public Flood Risk Cognition and Behavioral Response Based on IEC Strategy

    Science.gov (United States)

    Shen, Xin; Xu, Xiaofeng; Zhou, Guilin; Pan, Shaolin; Mi, Tengfei

    2017-11-01

    In order to disseminate knowledge and information on flood risks in flood-prone areas, raise public awareness of flood risks and reduce possible damage to the public, a questionnaire survey was coducted among 260 residents of nine selected communities in Jiaozhou City to learn the public awareness and behavioral response to flood risks at different early warning levels. IEC key information of flood risk awareness was modified and formulated through group discussions, in-depth individual interviews and on-site observation. The awareness of residents in the project area was enhanced through the public participation, environmental management and flood management training, which plays a very important role in reducing flood losses.

  13. Software validation applied to spreadsheets used in laboratories working under ISO/IEC 17025

    Science.gov (United States)

    Banegas, J. M.; Orué, M. W.

    2016-07-01

    Several documents deal with software validation. Nevertheless, more are too complex to be applied to validate spreadsheets - surely the most used software in laboratories working under ISO/IEC 17025. The method proposed in this work is intended to be directly applied to validate spreadsheets. It includes a systematic way to document requirements, operational aspects regarding to validation, and a simple method to keep records of validation results and modifications history. This method is actually being used in an accredited calibration laboratory, showing to be practical and efficient.

  14. NC ISO/IEC1725:00 Accreditation process of CPHR main laboratories

    International Nuclear Information System (INIS)

    Marrero Garcia, Mariela; Molina perez, Daniel; Fernandez Gomez, Maria; Walwyn Salas, Gonzalo

    2003-01-01

    With the objective of offering technically qualified and competitive services one works in our laboratories under the requirements of a System of the Quality from 1993. In 1999 that was already with a draft of the new model ISO/IEC 17025:00 the steps they were given for the change of the Guide 25. At the moment with 3 laboratories accredited by the Cuban organ (ONARC), we are pioneer in these changes because alone a very reduced group of laboratories in the country has achieved it. The present work enunciates the antecedents of the change, the main non conformities during the evaluations for the accreditation and the obtained results

  15. Integrating RAMS engineering and management with the safety life cycle of IEC 61508

    International Nuclear Information System (INIS)

    Lundteigen, Mary Ann; Rausand, Marvin; Utne, Ingrid Bouwer

    2009-01-01

    This article outlines a new approach to reliability, availability, maintainability, and safety (RAMS) engineering and management. The new approach covers all phases of the new product development process and is aimed at producers of complex products like safety instrumented systems (SIS). The article discusses main RAMS requirements to a SIS and presents these requirements in a holistic perspective. The approach is based on a new life cycle model for product development and integrates this model into the safety life cycle of IEC 61508. A high integrity pressure protection system (HIPPS) for an offshore oil and gas application is used to illustrate the approach.

  16. Performance test results of mock-up test facility of HTTR hydrogen production system

    International Nuclear Information System (INIS)

    Ohashi, Hirofumi; Inaba, Yoshitomo; Nishihara, Tetsuo

    2004-01-01

    For the purpose to demonstrate effectiveness of high-temperature nuclear heat utilization, Japan Atomic Energy Research Institute has been developing a hydrogen production system and has planned to connect the hydrogen production system to High Temperature Engineering Test Reactor (HTTR). Prior to construction of a HTTR hydrogen production system, a mock-up test facility was constructed to investigate transient behavior of the hydrogen production system and to establish system controllability. The Mock-up test facility with a full-scale reaction tube is an approximately 1/30-scale model of the HTTR hydrogen production system and an electric heater is used as a heat source instead of a reactor. After its construction, a performance test of the test facility was carried out in the same pressure and temperature conditions as those of the HTTR hydrogen production system to investigate its performance such as hydrogen production ability, controllability and so on. It was confirmed that hydrogen was stably produced with a hot helium gas about 120m 3 /h, which satisfy the design value, and thermal disturbance of helium gas during the start-up could be mitigated within the design value by using a steam generator. The mock-up test of the HTTR hydrogen production system using this facility will continue until 2004. (author)

  17. Tests Performed on Hydraulic Turbines at Commissioning or after Capital Repairs. Part II. Tests Performed on a 6.5 MW Kaplan Turbine

    Directory of Open Access Journals (Sweden)

    Adrian Cuzmoş

    2015-07-01

    Full Text Available The paper presents the tests performed on a hydraulic turbine on commissioning, the devices, test methods and the results obtained from the respective tests, as well as the conclusions and recommendations resulted from these tests. This kind of tests can be performed for the verification of guarantees.

  18. Performance analysis in Japanese field test program; Field test data kara no chiiki hatsuden kaiseki hoho

    Energy Technology Data Exchange (ETDEWEB)

    Sugiyama, H.; Kurokawa, K.; Uchida, D. [Tokyo University of Agriculture and Technology, Tokyo (Japan); Otani, K.; Sakuta, K.; Tsuda, I. [Electrotechnical Laboratory, Tsukuba (Japan); Oshiro, T.; Sakamoto, K. [Japan Quality Assurance Organization, Tokyo (Japan)

    1997-11-25

    Power generation characteristics are investigated using data collected in photovoltaic power generation field tests being undertaken by NEDO (New Energy and Industrial Technology Development Organization). The photovoltaic power generation system performance is evaluated by examining loss factors leading to degradation in system performance, with weather conditions such as variation in insolation and air temperature, inverter performance, and shadows cast by surrounding buildings taken into consideration. As the result, it is found that the important loss factors are degradation in module performance due to elevated temperature, drift in the maximum output control, degraded inverter performance due to input power variation, effect of shadows, etc. It is learned that system is greatly affected by degradation in module performance due to increased temperature in summer and by shadows in winter, the two being responsible for the output coefficient dropping to approximately 75% throughout the year. The output coefficient frequency distribution charts for the 75 test sites confirm that the rate is as low as 70-80% at many sites. As for the system operating time, it tends to be longer in West Japan where the annual insolation rate is higher. 3 refs., 10 figs.

  19. Performance tests of the reactor containment structures of HTTR

    International Nuclear Information System (INIS)

    Sakaba, Nariaki; Iigaki, Kazuhiko; Kawaji, Satoshi; Iyoku, Tatsuo

    1998-03-01

    The containment structures of the HTTR consist of the reactor containment vessel (CV), service area (SA) and emergency air purification system, which minimize the release of FPs in the postulated accidents with FP release from the reactor facilities. The CV is designed to withstand the temperature and pressure transients and to be leak-tight within the specified leakage limit even in the case of a rupture of the primary concentric hot gas duct. The pressure of inside of the SA should be maintained slightly lower than that of atmosphere by the emergency air purification system. The radioactive materials are released from the stack to environment via the emergency air purification system under the accident condition. Then the emergency air purification system should remove airborne radio-activities and should maintain proper pressure in the SA. We established the method to measure leak rate of the CV with closed reactor coolant pressure boundary although it is normally measured under opened reactor coolant pressure boundary as employed in LWRs. The CV leak rate test was carried out by the newly developed method and the expected performance was obtained. The SA and emergency air purification system were also confirmed by the performance test. We concluded that the reactor containment structures were fabricated to minimize the release of FPs in the postulated accidents with FP release from the reactor facilities. (author)

  20. Performance Test of BF3 Neutron Detection System

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Yu Sun; Shin, Ho Cheol [KHNP-CRI, Daejeon (Korea, Republic of); Cho, Jin Bok; Oh, Sae Hyun; Ryou, Seok Jean [USERS, Daejeon (Korea, Republic of)

    2015-10-15

    The neutron detecting system of First-of-a-kind plant such an APR1400 at Shin Kori should have been verified in the condition of low operating temperature and pressure of the primary coolant system before receiving the operation license. Auxiliary Ex-core Neutron Flux Monitoring System (AENFMS) is supposed to be installed using BF3 neutron detector in Shin Kori plant. The performance test of AENFMS was conducted to measure neutron sensitivity, moderation ratio and count rate in the same condition with Ex-core Neutron Flux Monitoring System (ENFMS) of APR1400 to verify its detection characteristics in compliance with the functional requirement. Performance test has been conducted for AENFMS of APR1400 to verify BF3 neutron sensitivity, moderation ration of PE, expecting neutron signal count rate from AENFMS, possible extending cable length from detector to pre-amplifier. As a result of measurement, the neutron sensitivity of 34.246±0.168(95%CI)cps/nv, moderation ratio of 11.343±0.039(95%CI) and AENFMS expecting count rate related to ENFMS of 17.8 times are acceptable in compliance with functional requirement, respectively.

  1. Performance testing of 3D point cloud software

    Directory of Open Access Journals (Sweden)

    M. Varela-González

    2013-10-01

    Full Text Available LiDAR systems are being used widely in recent years for many applications in the engineering field: civil engineering, cultural heritage, mining, industry and environmental engineering. One of the most important limitations of this technology is the large computational requirements involved in data processing, especially for large mobile LiDAR datasets. Several software solutions for data managing are available in the market, including open source suites, however, users often unknown methodologies to verify their performance properly. In this work a methodology for LiDAR software performance testing is presented and four different suites are studied: QT Modeler, VR Mesh, AutoCAD 3D Civil and the Point Cloud Library running in software developed at the University of Vigo (SITEGI. The software based on the Point Cloud Library shows better results in the loading time of the point clouds and CPU usage. However, it is not as strong as commercial suites in working set and commit size tests.

  2. Validation of Generic Models for Variable Speed Operation Wind Turbines Following the Recent Guidelines Issued by IEC 61400-27

    Directory of Open Access Journals (Sweden)

    Andrés Honrubia-Escribano

    2016-12-01

    Full Text Available Considerable efforts are currently being made by several international working groups focused on the development of generic, also known as simplified or standard, wind turbine models for power system stability studies. In this sense, the first edition of International Electrotechnical Commission (IEC 61400-27-1, which defines generic dynamic simulation models for wind turbines, was published in February 2015. Nevertheless, the correlations of the IEC generic models with respect to specific wind turbine manufacturer models are required by the wind power industry to validate the accuracy and corresponding usability of these standard models. The present work conducts the validation of the two topologies of variable speed wind turbines that present not only the largest market share, but also the most technological advances. Specifically, the doubly-fed induction machine and the full-scale converter (FSC topology are modeled based on the IEC 61400-27-1 guidelines. The models are simulated for a wide range of voltage dips with different characteristics and wind turbine operating conditions. The simulated response of the IEC generic model is compared to the corresponding simplified model of a wind turbine manufacturer, showing a good correlation in most cases. Validation error sources are analyzed in detail, as well. In addition, this paper reviews in detail the previous work done in this field. Results suggest that wind turbine manufacturers are able to adjust the IEC generic models to represent the behavior of their specific wind turbines for power system stability analysis.

  3. A Universal Motor Performance Test System Based on Virtual Instrument

    Directory of Open Access Journals (Sweden)

    Wei Li

    2014-09-01

    Full Text Available With the development of technology universal motors play a more and more important role in daily life and production, they have been used in increasingly wide field and the requirements increase gradually. How to control the speed and monitor the real-time temperature of motors are key issues. The cost of motor testing system based on traditional technology platform is very high in many reasons. In the paper a universal motor performance test system which based on virtual instrument is provided. The system achieves the precise control of the current motor speed and completes the measurement of real-time temperature of motor bearing support in order to realize the testing of general-purpose motor property. Experimental result shows that the system can work stability in controlling the speed and monitoring the real-time temperature. It has advantages that traditional using of SCM cannot match in speed, stability, cost and accuracy aspects. Besides it is easy to expand and reconfigure.

  4. Comparison of test performance profile for blood tests of liver fibrosis in chronic hepatitis C.

    Science.gov (United States)

    Halfon, Philippe; Bacq, Yannick; De Muret, Anne; Penaranda, Guillaume; Bourliere, Marc; Ouzan, Denis; Tran, Albert; Botta, Danielle; Renou, Christophe; Bréchot, Marie-Claude; Degott, Claude; Paradis, Valérie

    2007-03-01

    We evaluated the test performance profile (TPP) of blood tests of liver fibrosis. Three hundred and fifty-six patients with C chronic hepatitis were included in two centers. Metavir staging of liver specimens by two independent pathologists and the following tests were evaluated: Fibrotest (FT), APRI, FibroMeter (FM), and Hepascore (HS). Metavir stages were: F0: 4%, F1: 55%, F2: 26%, F3: 11%, and F4: 4%. The AUROCs were not significantly different, respectively, FT, FM, APRI, HS: >or=F2: 0.79, 0.78, 0.76, >or=0.76; F3: 0.81, 0.85, 0.81, 0.81; and F4: 0.86, 0.94, 0.92, 0.89. The TPP relies on the paired comparison of blood-test misclassification based on liver specimen, e.g. FT vs FM, respectively: F0+1: 18 vs 28% (p=0.0003), >or=F2: 43 vs 31% (p=0.004). There was no center effect. In those populations, the four blood tests had a similar performance for significant fibrosis (F>or=2), lying in the lower range of published results which is attributable to a low >or=F2 prevalence, and for >or=F3 and F4. However, FM and FT had performance profiles significantly different as a function of fibrosis stages or diagnostic target (fibrosis cut-off). This has to be considered during the interpretation process. Moreover, the performance should be reported with different diagnostic targets.

  5. New way of demonstrating the competence of a laboratory measuring radionuclides - The international draft standard ISO/IEC DIS 17025

    International Nuclear Information System (INIS)

    Palsson, S.E.

    1999-01-01

    In recent years there has been increased interest, and even need, amongst laboratories performing measurements of radionuclides to obtain accreditation. It has been discussed how this could be achieved with maximum flexibility for the laboratories and with minimum effort. The issuing of a new draft international standard, the ISO/IEC DIS 17025, created speculations whether it could offer a new and better way for laboratories to obtain accreditation. It was decided within the NKS/BOK-1.1 project to explore possible options for obtaining accreditation and what possibilities the new standard could offer. The benefits of computerised document control systems were also explored. The results were reported at the 12th Annual Meeting of the Nordic Society for Radiation Protection, 23-27 August 1999. Since then the final version of the standard has been published. The voting will continue until November 16th 1999 and is not clear at present whether the standard will be accepted or not. The original version of this paper was updated to reflect these recent developments. (au)

  6. Combining ISO/IEC 17025:2005 and European Commission Decision 2002/657 audit requirements: a practical way forward.

    Science.gov (United States)

    Kay, Jack F

    2012-08-01

    Laboratories involved in the analyses of veterinary drug residues are under increasing pressure to demonstrate that they produce meaningful and reliable data. Quality assurance and quality control systems are implemented in laboratories to provide evidence of this and these are subject to external assessment to ensure that they are effective. Audits to ISO/IEC 17025:2005, an internationally accepted standard, and subsequent accreditation provide laboratories and their customers with a degree of assurance that the laboratories are operating in control and the data they report can be relied on. However, national or regional authorities may place additional requirements on laboratories to ensure quality data are reported. For example, in the European Union, all official control laboratories involved in veterinary drug residue analyses must also meet the requirements of European Commission Decision 2002/657/EC which sets performance criteria for analytical methods used in this area and these are subject to additional audits by national or regional authorities. All audits place considerable time and resource demands on laboratories and this paper discusses the burden audits place on laboratories and describes a UK initiative to combine these audits to the benefit of both the regulatory authority and the laboratory. © 2012 John Wiley & Sons, Ltd.

  7. Shear punch tests performed using a new low compliance test fixture

    International Nuclear Information System (INIS)

    Toloczko, M.B.; Kurtz, R.J.; Hasegawa, A.; Abe, K.

    2002-01-01

    Based on a recent finite element analysis (FEA) study performed on the shear punch test technique, it was suggested that compliance in a test frame and fixturing which is quite acceptable for uniaxial tensile tests, is much too large for shear punch tests. The FEA study suggested that this relatively large compliance was masking both the true yield point and the shape of the load versus displacement trace obtained in shear punch tests. The knowledge gained from the FEA study was used to design a new shear punch test fixture which more directly measures punch tip displacement. The design of this fixture, the traces obtained from this fixture, and the correlation between uniaxial yield stress and shear yield stress obtained using this fixture are presented here. In general, traces obtained from the new fixture contain much less compliance resulting in a trace shape which is more similar in appearance to a corresponding uniaxial tensile trace. Due to the more direct measurement of displacement, it was possible to measure yield stress at an offset shear strain in a manner analogous to yield stress measurement in a uniaxial tensile test. The correlation between shear yield and uniaxial yield was altered by this new yield measurement technique, but the new correlation was not as greatly improved as was suggested would occur from the FEA study

  8. Performance testing of LiDAR exploitation software

    Science.gov (United States)

    Varela-González, M.; González-Jorge, H.; Riveiro, B.; Arias, P.

    2013-04-01

    Mobile LiDAR systems are being used widely in recent years for many applications in the field of geoscience. One of most important limitations of this technology is the large computational requirements involved in data processing. Several software solutions for data processing are available in the market, but users are often unknown about the methodologies to verify their performance accurately. In this work a methodology for LiDAR software performance testing is presented and six different suites are studied: QT Modeler, AutoCAD Civil 3D, Mars 7, Fledermaus, Carlson and TopoDOT (all of them in x64). Results depict as QTModeler, TopoDOT and AutoCAD Civil 3D allow the loading of large datasets, while Fledermaus, Mars7 and Carlson do not achieve these powerful performance. AutoCAD Civil 3D needs large loading time in comparison with the most powerful softwares such as QTModeler and TopoDOT. Carlson suite depicts the poorest results among all the softwares under study, where point clouds larger than 5 million points cannot be loaded and loading time is very large in comparison with the other suites even for the smaller datasets. AutoCAD Civil 3D, Carlson and TopoDOT show more threads than other softwares like QTModeler, Mars7 and Fledermaus.

  9. AIChe equipment testing procedure centrifugal compressors : a guide to performance evaluation and site testing

    CERN Document Server

    AIChE

    2013-01-01

    With its engineer-tested procedures and thorough explanations, Centrifugal Compressors is an essential text for anyone engaged in implementing new technology in equipment design, identifying process problems, and optimizing equipment performance.  This condensed book presents a step by step approach to preparing for, planning, executing, and analyzing tests of centrifugal compressors, with an emphasis on methods that can be conducted on-site and with an acknowledgement of the strengths and limitations of these methods. The book opens with an extensive and detailed section offering definitions

  10. Protective Effect of Wheat Peptides against Indomethacin-Induced Oxidative Stress in IEC-6 Cells

    Directory of Open Access Journals (Sweden)

    Hong Yin

    2014-01-01

    Full Text Available Recent studies have demonstrated that wheat peptides protected rats against non-steroidal anti-inflammatory drugs-induced small intestinal epithelial cells damage, but the mechanism of action is unclear. In the present study, an indomethacin-induced oxidative stress model was used to investigate the effect of wheat peptides on the nuclear factor-κB(NF-κB-inducible nitric oxide synthase-nitric oxide signal pathway in intestinal epithelial cells-6 cells. IEC-6 cells were treated with wheat peptides (0, 125, 500 and 2000 mg/L for 24 h, followed by 90 mg/L indomethacin for 12 h. Wheat peptides significantly attenuated the indomethacin-induced decrease in superoxide dismutase and glutathione peroxidase activity. Wheat peptides at 2000 mg/L markedly decreased the expression of the NF-κB in response to indomethacin-induced oxidative stress. This study demonstrated that the addition of wheat peptides to a culture medium significantly inhibited the indomethacin-induced release of malondialdehyde and nitrogen monoxide, and increased antioxidant enzyme activity in IEC-6 cells, thereby providing a possible explanation for the protective effect proposed for wheat peptides in the prevention of indomethacin-induced oxidative stress in small intestinal epithelial cells.

  11. The Load Level of Modern Wind Turbines according to IEC 61400-1

    International Nuclear Information System (INIS)

    Freudenreich, K; Argyriadis, K

    2007-01-01

    The paper describes some effects on the load level of state-of-the art multi megawatt wind turbines introduced by the new edition of the standard IEC 61400-1:2005 W ind Turbines - Part 1: Design requirements . Compared to the previous edition, especially the extreme load determination has been modified by applying stochastic and statistical analyses. Within this paper the effect on the overall load level of wind turbines is demonstrated and occurring problems are discussed. Load simulations have been carried out for four state-of-the-art multi-megawatt wind turbines of different design concepts and from different manufacturers. The blade root bending moments and tip deflection have been determined by applying different extrapolation methods. Advantages and disadvantages of these methods and tail fittings for different load components and wind turbine technologies are discussed and interpreted. Further on, the application of the extreme turbulence model is demonstrated. The dependence of the load level on the turbulence intensity and control system, as well as the interaction with extrapolated loads is discussed and limitations outlined. The obtained load level is compared to the overall load level of the turbines according to the previous edition of the standard, IEC 61400-1:1999

  12. Perencanaan dan Implementasi Information Security Management System Menggunakan Framework ISO/IEC 20071

    Directory of Open Access Journals (Sweden)

    Anggi Anugraha Putra

    2016-01-01

    Full Text Available Penerapan tata kelola Teknologi Informasi saat ini sudah menjadi kebutuhan dan tuntutan di setiap instansi penyelenggara pelayanan publik mengingat peran TI yang semakin penting bagi upaya peningkatan kualitas layanan sebagai salah satu realisasi dari tata kelola pemerintahan yang baik (Good Corporate Governance. Dalam penyelenggaraan tata kelola TI, faktor keamanan informasi merupakan aspek yang sangat penting diperhatikan mengingat kinerja tata kelola TI akan terganggu jika informasi sebagai salah satu objek utama tata kelola TI mengalami masalah keamanan informasi yang menyangkut kerahasiaan (confidentiality, keutuhan (integrity dan ketersediaan (availability. Information Security Management System (ISMS adalah seperangkat kebijakan berkaitan dengan manajemen keamanan informasi atau terkait dengan risiko TI. Prinsip yang mengatur di balik ISMS adalah bahwa organisasi harus merancang, menerapkan dan memelihara seperangkat kebijakan, proses dan sistem untuk mengelola risiko aset informasi mereka, sehingga memastikan tingkat risiko keamanan informasi yang dapat diterima. Dari perencanaan dan implementasi sistem manajemen keamanan informasi ini, dihasilkan daftar nilai risiko akhir aset- aset kritikal dan dokumen-dokumen tata kelola penunjang ISMS. Metode penelitian yang digunakan adalah studi kasus yang didalam hal ini, merupakan penelitian kualitatif. Adapun proses yang digunakan untuk mengukur tingkat kematangan dari tata kelola keamanan sistem informasi ini berdasarkan kerangka kerja ISO/IEC 27001. Dari kerangka tersebut kemudian dilakukan evaluasi terhadap objek kontrol yang dimiliki ISO/IEC 27001. Hasil yang didapat adalah peningkatan terhadap tata kelola keamanan sistem informasi. Kesimpulan dari penelitian ini adalah dibutuhkannya tata kelola keamanan sistem informasi agar IT dapat diandalkan untuk mencapai tujuan bisnis.

  13. Theoretical and testing performance of an innovative indirect evaporative chiller

    Energy Technology Data Exchange (ETDEWEB)

    Jiang, Yi; Xie, Xiaoyun [Department of Building Science and Technology, Tsinghua University, Beijing (China)

    2010-12-15

    An indirect evaporative chiller is a device used to produce chilled water at a temperature between the wet bulb temperature and dew point of the outdoor air, which can be used in building HVAC systems. This article presents a theoretical analysis and practical performance of an innovative indirect evaporative chiller. First, the process of the indirect evaporative chiller is introduced; then, the matching characteristics of the process are presented and analyzed. It can be shown that the process that produces cold water by using dry air is a nearly-reversible process, so the ideal produced chilled water temperature of the indirect evaporative chiller can be set close to the dew point temperature of the chiller's inlet air. After the indirect evaporative chiller was designed, simulations were done to analyze the output water temperature, the cooling efficiency relative to the inlet dew point temperature, and the COP that the chiller can performance. The first installation of the indirect evaporative chiller of this kind has been run for 5 years in a building in the city of Shihezi. The tested output water temperature of the chiller is around 14-20 C, which is just in between of the outdoor wet bulb temperature and dew point. The tested COP{sub r,s} of the developed indirect evaporative chiller reaches 9.1. Compared with ordinary air conditioning systems, the indirect evaporative chiller can save more than 40% in energy consumption due to the fact that the only energy consumed is from pumps and fans. An added bonus is that the indirect evaporative chiller uses no CFCs that pollute to the aerosphere. The tested internal parameters, such as the water-air flow rate ratio and heat transfer area for each heat transfer process inside the chiller, were analyzed and compared with designed values. The tested indoor air conditions, with a room temperature of 23-27 C and relative humidity of 50-70%, proved that the developed practical indirect evaporative chiller

  14. Forward lunge as a functional performance test in ACL deficient subjects: test-retest reliability

    DEFF Research Database (Denmark)

    Alkjaer, Tine; Henriksen, Marius; Dyhre-Poulsen, Poul

    2009-01-01

    The forward lunge movement may be used as a functional performance test of anterior cruciate ligament (ACL) deficient and reconstructed subjects. The purposes were 1) to determine the test-retest reliability of a forward lunge in healthy subjects and 2) to determine the required numbers...... of repetitions necessary to yield satisfactory reliability. Nineteen healthy subjects performed four trials of a forward lunge on two different days. The movement time, impulses of the ground reaction forces (IFz, IFy), knee joint kinematics and dynamics during the forward lunge were calculated. The relative...... reliability was determined by calculation of Intraclass Correlation Coefficients (ICC). The IFz, IFy and the positive work of the knee extensors showed excellent reliability (ICC >0.75). All other variables demonstrated acceptable reliability (0.4>ICCreliability increased when more than...

  15. Sealing performance test for main flange of pressure vessel of T2 test section in HENDEL

    International Nuclear Information System (INIS)

    Ioka, Ikuo; Inagaki, Yoshiyuki; Matsumoto, Kiminori; Kondou, Yasuo; Suzuki, Kunihiko; Miyamoto, Yoshiaki; Asami, Masanobu.

    1990-12-01

    A pressure vessel of T 2 test section in helium engineering demonstration loop (HENDEL) was fabricated to the same scale of the reactor pressure vessel made of 2(1/4)Cr-1Mo steel in high temperature engineering test reactor (HTTR). Also, the sealing structure of a main flange of pressure vessel in T 2 test section was composed of the double metal O-rings and Ω-seal which would be used in the sealing structure of HTTR. The sealing performance test for the main flange of the pressure vessel in T 2 test section was carried out to confirm the integrity of sealing structure of a main flange in HTTR. T 2 test section has been operated about 7700 hours in previous 18 cycles. The leakage of helium gas from inner metal O-ring was measured by the static pressurized process under the operating condition of HTTR (helium gas: 400degC, 40kg/cm 2 G, 4gk/s). The calculated leakage of helium gas was less than 9.6x10 -7 atm·cm 3 /sec. From the result, it is expected that the sealing structure of main flange in HTTR would maintain the leak tightness in the life. (author)

  16. Smell test predicts performance on delayed recall memory test in elderly with depression.

    Science.gov (United States)

    Scalco, Monica Z; Streiner, David L; Rewilak, Dmytro; Castel, Saulo; Van Reekum, Robert

    2009-04-01

    Elderly with depression are at increased risk for cognitive dysfunction and dementia. Smell tests are correlated with performance on cognitive tests in the elderly and therefore might serve as a screening test for cognitive impairment in depressed elderly. To assess the validity of the CC-SIT (Cross-Cultural Smell Identification Test) as a screening test for cognitive impairment in elderly with depression. Forty-one patients, aged 60 and over, were assessed with the CC-SIT and CVLT (California Verbal Learning Test) after 3 months treatment of a Major Depressive Episode (DSM-IV) at the Day Hospital for Depression, Baycrest. Patients already diagnosed with dementia, or other psychiatric and neurological disorders, were excluded. Receiver Operating Characteristics (ROC) analysis was applied to assess the CC-SIT's accuracy in identifying individuals with impairment (2 SD below the mean for age and education or less) on CVLT delayed recall trials. Forty-one patients (33 women and eight men) were assessed. Mean age was 76.8 (SD: 6.5), mean HRSD scores before treatment was 22.0 (SD: 5.1). Nine patients had impairment on CVLT delayed recall measures. The area under the ROC curve was 0.776 (95% CI = 0.617-0.936). Our results support the use of the CC-SIT as a screening tool for cognitive impairment among elderly with depression as an indicator for the need of a comprehensive neuropsychological evaluation. Replication with larger samples is necessary. (c) 2008 John Wiley & Sons, Ltd.

  17. Biodiesel production through hydrodynamic cavitation and performance testing

    Energy Technology Data Exchange (ETDEWEB)

    Pal, Amit; Verma, Ashish; Kachhwaha, S.S.; Maji, S. [Department of Mechanical Engineering, Delhi College of Engineering, Bawana Road, Delhi 110042 (India)

    2010-03-15

    This paper presents the details of development of a biodiesel production test rig based on hydrodynamic cavitation followed by results of experimental investigation carried out on a four cylinder, direct injection water cooled diesel engine operating on diesel and biodiesel blend of Citrullus colocyntis (Thumba) oil. The experiment covers a wide range of engine rpm. Results show that biodiesel of Thumba oil produced through hydrodynamic cavitation technique can be used as an alternative fuel with better performance and lower emissions compared to diesel. The most significant conclusions are that (1) Biodiesel production through hydrodynamic cavitation technique seems to be a simple, efficient, time saving, eco-friendly and industrially viable process. (2) 30% biodiesel blend of Thumba oil shows relatively higher brake power, brake thermal efficiency, reduced bsfc and smoke opacity with favourable p-{theta} diagram as compared to diesel. (author)

  18. Performance Test of Alpha Spectrometry for Environmental Radioactivity Analysis

    International Nuclear Information System (INIS)

    Choi, Jung Youn; Yoon, Jong-Ho; Han, Ki-Tek; Ahn, Gil Hoon

    2015-01-01

    Environmental samples are analyzed by various methods such as, ICP-MS (inductively coupled plasma mass spectrometry), AMS (accelerator mass spectrometry) TIMS (thermal ionization mass spectrometry), HRGS (high resolution gamma spectrometry) and alpha /beta particle analysis. In this study, we will described the result of performance test using alpha spectrometry for analyzing environmental samples. Measurement data of the U activity using SRM based on extraction chromatography with UTEVA resin. It should be effective way to separate of uranium isotope for the measurement of alpha spectrometry. But, the result of this measurement data is higher than another recovery data. Also concentration of U data is lack of consistency. We leave out of consideration many effect of factors about influence in the experiment process. In the future work, we will try to reduce the step of experiment process and reflect the uncertainty factors

  19. Confirmation test on confinement performance of improved glove box

    International Nuclear Information System (INIS)

    Miura, S.; Kanazawa, J.; Nakajima, M.; Sakuno, K.; Miyata, H.

    1995-01-01

    Glove boxes are used at nuclear facilities to confine radioactive materials by ensuring a high level of airtightness and negative internal pressure. The allowable rate of air leakage is 0.1% vol/hr or less at the pre-service inspection. The negative pressure value is normally maintained at about -30 mm H 2 O. Structural strength and confinement reliability of glove boxes during earthquake are major concerns, and most important glove boxes are designed to withstand seismic class A events is Japan. This paper describes vibration tests done to confirm that improve large-sized glove boxes maintain their confinement performance and structural strength even during earthquake and that the design analysis methods used are appropriate. (author). 1 ref., 6 figs., 3 tabs

  20. Development and performance test of a solar tracker

    Energy Technology Data Exchange (ETDEWEB)

    Mahdi, T.H.; Hasib, Z.M. [Bangladesh Univ. of Engineering and Technology, Dhaka (Bangladesh). Dept. of Mechanical Engineering

    2010-07-01

    This paper discussed the development of a low-cost solar tracker device designed for use in developing countries. Expert control sensors and input-output interfaces were integrated with a tracking mechanism to increase the energy generation efficiency of the solar panel. Light sensing devices were used to automatically track the sun's rays. The controller sensors were integrated with the tracking mechanism. The control system was implemented on a microcontroller-based embedded system. A graphical user interface (GUI) was incorporated with a commercial software program in order to make the system more user-friendly. Performance tests demonstrated that the tracking system increases the amount of power that the solar panels could obtain. The efficiency of the panels increased by between 18 and 23 percent. Operators were able to control the movement of individual solar panels from a control room. The system also alerted operators of environmental damage to the panels. 12 refs., 2 tabs., 13 figs.