WorldWideScience

Sample records for palo verde nuclear

  1. Palo Verde nuclear dynamic analysis (PANDA)

    International Nuclear Information System (INIS)

    Girjashankar, P.V.; Secker, P.A. Jr.; LeClair, S.J.; Mendoza, J.; Webb, J.R.

    1988-01-01

    Arizona Nuclear Power Project (ANPP) has initiated the development of a large scale dynamic analysis computer program for the Palo Verde Nuclear Generating Station (PVNGS). This paper presents the decision processes and preliminary development activities that have been pursued related to the code development. The PANDA (Palo Verde Nuclear Dynamic Analysis) code will be used for a variety of applications as described in this paper

  2. 75 FR 52045 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Unit 3; Environmental...

    Science.gov (United States)

    2010-08-24

    ... Company, Palo Verde Nuclear Generating Station, Unit 3; Environmental Assessment and Finding of No.... NPF-74, issued to Arizona Public Service Company (APS, the licensee), for operation of Palo Verde... Statement for the Palo Verde Nuclear Generating Station, NUREG-0841, dated February 1982. Agencies and...

  3. 76 FR 1197 - Arizona Public Service Company, Palo Verde Nuclear Generating Station; Notice of Availability of...

    Science.gov (United States)

    2011-01-07

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-528, 50-529, 50-530; NRC-2009-0012] Arizona Public Service Company, Palo Verde Nuclear Generating Station; Notice of Availability of the Final Supplement 43... of operation for the Palo Verde Nuclear Generating Station (PVNGS). Possible alternatives to the...

  4. 76 FR 24064 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Notice...

    Science.gov (United States)

    2011-04-29

    ... Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Notice of Issuance of Renewed... Company (licensee), the operator of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (PVNGS... Plants: Supplement 43, Regarding Palo Verde Nuclear Generating Station,'' issued January 2011, discusses...

  5. Search for neutrino oscillations at the palo verde nuclear reactors

    Science.gov (United States)

    Boehm; Busenitz; Cook; Gratta; Henrikson; Kornis; Lawrence; Lee; McKinny; Miller; Novikov; Piepke; Ritchie; Tracy; Vogel; Wang; Wolf

    2000-04-24

    We report on the initial results from a measurement of the antineutrino flux and spectrum at a distance of about 800 m from the three reactors of the Palo Verde Nuclear Generating Station using a segmented gadolinium-loaded scintillation detector. We find that the antineutrino flux agrees with that predicted in the absence of oscillations excluding at 90% C.L. nu;(e)-nu;(x) oscillations with Deltam(2)>1.12x10(-3) eV(2) for maximal mixing and sin (2)2straight theta>0.21 for large Deltam(2). Our results support the conclusion that the atmospheric neutrino oscillations observed by Super-Kamiokande do not involve nu(e).

  6. Palo Verde nuclear generating station EASEplus SIMULATE model

    International Nuclear Information System (INIS)

    McDonald, W.F.; Reed, M.L.; Fauste, J.L.

    1992-01-01

    The Palo Verde on-site reactor engineers have an extremely powerful and accurate tool for quickly predicting the effects of reactor power maneuvers on core axial shape index (ASI) and xenon worth. They can analyze postulated future power maneuvers quickly and supply the reactor operators with valuable predictions without having to consult with the off-site nuclear analysis group. The tool developed by the nuclear analysis group was an advanced nodal code with a graphic user interface (GUI) driver for ease of use. The advanced nodal code used was the Studsvik of America SIMULATE-3 Version 2.20-DSI. This SIMULATE version was compiled for use on a personal computer (PC) with a Definicon Systems' 50-MHz coprocessor board. The GUI face used was Expert-EASE Systems' EASE+SIM3 Version 3.0 pre-/postprocessor. The system was installed on Compaq Deskpro 386/20e PCs located in the control room of each of the three units, in the reactor engineering office, in the nuclear analysis office, and in the control room of the training simulator

  7. Chemistry technician performance evaluation program Palo Verde Nuclear Generating Station

    International Nuclear Information System (INIS)

    Shawver, J.M.

    1992-01-01

    The Arizona Nuclear Power Project (ANPP), a three-reactor site located 50 miles west of Phoenix, Arizona, has developed and implemented a program for evaluating individual chemistry technician analytical performance on a routine basis. About 45 chemistry technicians are employed at the site, 15 at each operating unit. The technicians routinely perform trace level analyses for impurities of concern to PWRs. Each month a set of blind samples is provided by an outside vendor. The blind samples contain 16 parameters which are matrixed to approximate the PWR's primary and secondary cycles. Nine technicians receive the samples, three from each operating unit, and perform the required analyses. Acceptance criteria for successful performance on the blind parameters is based on the values found in the Institute of Nuclear Power Operations (INPO) Document 83-016, Revision 2, August 1989, Chemistry Quality Control Program. The goal of the program is to have each technician demonstrate acceptable performance on each of 16 analytical parameters. On completion of each monthly set, a summary report of all of the analytical results for the sample set is prepared. From the summary report, analytical bias can be detected, technician performance is documented, and overall laboratory performance can be evaluated. The program has been very successful at satisfying the INPO requirement that the analytical performance of each individual technician should be checked on at least a six-month frequency for all important parameters measured. This paper describes the program as implemented at the Palo Verde Nuclear Generating Station and provides a summary report and trend and bias graphs for illustrative purposes

  8. 75 FR 13606 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-03-22

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. STN 50-528, STN 50-529, and STN 50-530; NRC-2010-0114] Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Environmental...-74, issued to Arizona Public Service Company (APS, the licensee), for operation of the Palo Verde...

  9. 75 FR 8149 - Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-02-23

    ...] Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3... NPF-74, issued to the Arizona Public Service Company (APS, or the licensee), for operation of the Palo Verde Nuclear Generating Station (PVNGS, the facility), Units 1, 2, and 3, respectively, located in...

  10. Palo Verde Nuclear Generating Station: an example of the state role in regional nuclear projects

    International Nuclear Information System (INIS)

    Pasternak, A.

    1980-10-01

    A nuclear power plant siting policy which confines new construction to existing sites will lead to the formation of large regional power centers, each involving many utilities from several states. The Palo Verde Nuclear Project in Arizona has been examined in terms of the role state regulation plays in large regional nuclear projects. State regulatory processes do not reflect the regional nature of large power centers. Decisions and actions by individual state regulatory commissions create risk and uncertainty for all the utility participants in regional projects. A climate and mechanism to encourage and facilitate interstate cooperation are needed to enhance the viability of the confined siting policy and the regional power center concept

  11. The Palo Verde story: a foundation for future multi-station nuclear power plants

    International Nuclear Information System (INIS)

    Brunt, Jr.E.E.Van; Ferguson, C.

    1987-01-01

    In 1973, the design and planning for the Palo Verde Nuclear Generating Station Was started featuring three 3800 MWt Combustion Engineering Standard System 80 Nuclear Steam Supply Systems. Arizona Public Service Company (APS) was the Project Manager and Operating Agent and Bechtel Power Corporation the architect/engineer and constructor. The Palo Verde units are located in a desert environment some 50 miles west of Phoenix, Arizona. It is a 'dry site' in that there are no liquid discharges from the site. The cooling tower makeup water sewage is waste effluent from the City of Phoenix treated at an on site reclamation facility. The effluent has had primary and secondary treatment at the Phoenix plant prior to delivery to PVNGS. The units are physically separate from each other but are of identical design. There are no shared safety systems between the units. Unit 1 and Unit 2 are both in commercial operation (January, 1986 and September, 1986 respectively). Unit 3 is scheduled to load fuel late in the first quarter of 1987. This paper presents some of the engineering and management practices used during design, construction, and startup and operational experiences and other unique features of this multi-unit nuclear station. The site arrangement is shown in Figure 1

  12. 75 FR 53985 - Arizona Public Service Company, et al., Palo Verde Nuclear Generating Station, Unit 3; Temporary...

    Science.gov (United States)

    2010-09-02

    ... NUCLEAR REGULATORY COMMISSION [Docket No. STN 50-530; NRC-2010-0281] Arizona Public Service Company, et al., Palo Verde Nuclear Generating Station, Unit 3; Temporary Exemption 1.0 Background Arizona Public Service Company (APS, the licensee) is the holder of Facility Operating License No. NPF-74, which...

  13. Auxiliary feedwater system risk-based inspection guide for the Palo Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Bumgardner, J.D.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.; Sloan, J.A.

    1993-02-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Palo Verde was selected as one of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Palo Verde plants

  14. 75 FR 15745 - Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-03-30

    ...] Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Exemption 1.0 Background The Arizona Public Service Company (APS, the licensee) is the holder of Facility... Generating Station (PVNGS), Units 1, 2, and 3, respectively. The licenses provide, among other things, that...

  15. Decontamination and disposal of Sb-124 at Palo Verde Nuclear Generating Station

    International Nuclear Information System (INIS)

    Miller, A.D.; Hillmer, T.P.; Kester, J.W.; Hensch, J.R.

    1988-01-01

    Palo Verde Nuclear Generating Station (PVNGS) is a three unit Combustion Engineering pressurized water reactor site. Each unit consists of an identical, self contained 1270 MWe reactor. This standardized design allows sharing of design improvements and equipment leading to optimum operation of the individual units. One design improvement, identified early into the operation of Unit 1, involved the elemental antimony content of the seals and bearings within the reactor coolant pumps. Normal wear of these components releases small amounts of elemental antimony. This antimony in turn deposits on in-core surfaces and activates to produce the isotopes Sb-122 and Sb-124. These isotopes emit highly energetic gamma rays which contribute significantly to the exposure and radwaste disposal charges at PVNGS. For these reasons, the Antimony Removal Program was undertaken to remove the radioactive and elemental antimony from the nuclear steam supply system at all three units. The work presented here describes the antimony decontamination and disposal

  16. A novel feedwater system for the RETRAN model of the Palo Verde nuclear generating station

    International Nuclear Information System (INIS)

    Secker, P.A.; Webb, J.R.

    1988-01-01

    This paper presents a feedwater system model which supplies realistic boundary conditions to the RETRAN model of a Palo Verde Nuclear Generating Station reactor plant. The RETRAN thermal hydraulic code is used to analyze nuclear reactor system transients through a generalized thermal hydraulic volume/junction network. The feedwater system model is implemented using the control block modeling option available in the RETRAN code. The output of the control block model is coupled to the thermal hydraulic network by a fill junction. A forward Euler integration scheme is used by RETRAN for control block variables. The feedwater system model is formulated to allow implicit integration within the existing code framework. The potential need for small integration time steps is, therefore, alleviated. The model results are compared with test data

  17. Experience with reactor power cutback system at Palo Verde nuclear generating station

    International Nuclear Information System (INIS)

    Chari, D.R.; Rec, J.R.; Simoni, L.P.; Eimar, R.L.; Sowers, G.W.

    1987-01-01

    Palo Verde Nuclear Generating Station (PVNGS) is a three unit site which illustrates System 80 nuclear steam supply system (NSSS) design. The System 80 NSSS is the Combustion Engineering (C-E) standard design rated at 3817 Mwth. PVNGS Units 1 and 2 achieved commercial operation on February 13, 1986 and September 22, 1986, respectively, while Unit 3 has a forecast date for commercial operation in the third quarter of 1987. The System 80 design incorporates a reactor power cutback system (RPCS) feature which reduces plant trips caused by two common initiating events: loss of load/turbine trip (LOL) and loss of one main feedwater pump (LOMFWP). The key design objective of the RPCS is to improve overall plant availability and performance, while minimizing challenges to the plant safety system

  18. Palo Verde College Facts, 2001.

    Science.gov (United States)

    Palo Verde Coll., Blythe, CA.

    This is a 2001 report on Palo Verde College (PVC) (California) student demographics, enrollment status, citizenship, educational goals, and academic persistence. Student data were collected and analyzed to meet accrediting standards, improve institutional effectiveness, and fulfill the local district's mission. The report discusses enrollment…

  19. Achieving engineering excellence at Palo Verde

    International Nuclear Information System (INIS)

    Prawlocki, F.C.

    1989-01-01

    Early in 1988, the management of the newly formed Palo Verde Nuclear Generating Station (PVNGS) Engineering and Construction Division was faced with a dilemma: how to build a competent, confident, efficient engineering organization in the face of increasing requirements and tightened fiscal controls. This paper discusses steps taken by Palo Verde to address actions taken to effect a smooth transition from construction to operations and the development of the Engineering Excellence Program. The Engineering Excellence Program will continue to evolve over time as the number of the NED's [Nuclear Engineering Department] personnel grown and processes are changed over the course of the next few years. As tasks from the Engineering Excellence Program action plan are completed, the results achieved are expected to be integrated into the routine business of the NED

  20. Palo Verde receives new control room simulator

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    A new control room simulator was delivered to Arizona Public Service Company's Palo Verde nuclear generating station in late August. The system, the second simulator on site, will be used for training beginning in January 1994, said David C. Brown, manager of the simulator upgrade project. Having two simulators will ease the current tight training schedule, and allow expansion of instruction to personnel other than licensed operators

  1. Risk-based inservice testing program modifications at Palo Verde nuclear generating station

    Energy Technology Data Exchange (ETDEWEB)

    Knauf, S.; Lindenlaub, B.; Linthicum, R.

    1996-12-01

    Arizona Public Service Company (APS) is investigating changes to the Palo Verde Inservice Testing (IST) Program that are intended to result in the reduction of the required test frequency for various valves in the American Society of Mechanical Engineers (ASME) Section XI IST program. The analytical techniques employed to select candidate valves and to demonstrate that these frequency reductions are acceptable are risk based. The results of the Palo Verde probabilistic risk assessment (PRA), updated in June 1994, and the risk significant determination performed as part of the implementation efforts for 10 CFR 50.65 (the maintenance rule) were used to select candidate valves for extended test intervals. Additional component level evaluations were conducted by an `expert panel.` The decision to pursue these changes was facilitated by the ASME Risk-Based Inservice Testing Research Task Force for which Palo Verde is participating as a pilot plant. The NRC`s increasing acceptance of cost beneficial licensing actions and risk-based submittals also provided incentive to seek these changes. Arizona Public Service is pursuing the risk-based IST program modification in order to reduce the unnecessary regulatory burden of the IST program through qualitative and quantitative analysis consistent with maintaining a high level of plant safety. The objectives of this project at Palo Verde are as follows: (1) Apply risk-based technologies to IST components to determine their risk significance (i.e., high or low). (2) Apply a combination of deterministic and risk-based methods to determine appropriate testing requirements for IST components including improvement of testing methods and frequency intervals for high-risk significant components. (3) Apply risk-based technologies to high-risk significant components identified by the {open_quotes}expert panel{close_quotes} and outside of the IST program to determine whether additional testing requirements are appropriate.

  2. Risk-based inservice testing program modifications at Palo Verde nuclear generating station

    International Nuclear Information System (INIS)

    Knauf, S.; Lindenlaub, B.; Linthicum, R.

    1996-01-01

    Arizona Public Service Company (APS) is investigating changes to the Palo Verde Inservice Testing (IST) Program that are intended to result in the reduction of the required test frequency for various valves in the American Society of Mechanical Engineers (ASME) Section XI IST program. The analytical techniques employed to select candidate valves and to demonstrate that these frequency reductions are acceptable are risk based. The results of the Palo Verde probabilistic risk assessment (PRA), updated in June 1994, and the risk significant determination performed as part of the implementation efforts for 10 CFR 50.65 (the maintenance rule) were used to select candidate valves for extended test intervals. Additional component level evaluations were conducted by an 'expert panel.' The decision to pursue these changes was facilitated by the ASME Risk-Based Inservice Testing Research Task Force for which Palo Verde is participating as a pilot plant. The NRC's increasing acceptance of cost beneficial licensing actions and risk-based submittals also provided incentive to seek these changes. Arizona Public Service is pursuing the risk-based IST program modification in order to reduce the unnecessary regulatory burden of the IST program through qualitative and quantitative analysis consistent with maintaining a high level of plant safety. The objectives of this project at Palo Verde are as follows: (1) Apply risk-based technologies to IST components to determine their risk significance (i.e., high or low). (2) Apply a combination of deterministic and risk-based methods to determine appropriate testing requirements for IST components including improvement of testing methods and frequency intervals for high-risk significant components. (3) Apply risk-based technologies to high-risk significant components identified by the open-quotes expert panelclose quotes and outside of the IST program to determine whether additional testing requirements are appropriate

  3. Burrowing Owl - Palo Verde Valley [ds197

    Data.gov (United States)

    California Natural Resource Agency — These burrowing owl observations were collected during the spring and early summer of 1976 in the Palo Verde Valley, eastern Riverside County, California. This is an...

  4. Human factors engineering control-room-design review/audit report: Palo Verde Nuclear Generating Station, Arizona Public Service Company

    International Nuclear Information System (INIS)

    Savage, J.W.; Lappa, D.A.

    1981-01-01

    A human factors engineering design review of the Palo Verde control room simulator was performed at the site on September 15 through September 17, 1981. Observed human factors design discrepancies were given priority ratings. This report summarizes the team's observations of the control room design and layout and of the control room operators' interface with the control room environment. A list of the human factors strengths observed in the Palo Verde control room simulator is given

  5. Escuela Superior de Palos Verdes

    Directory of Open Access Journals (Sweden)

    Neutra, Richard J.

    1965-02-01

    Full Text Available Before initiating the building operations for the «Palos Verdes» School, the site was divided into two large horizontal surfaces, at different levels. The lower one served to accommodate the playing fields, a car park, the physical training building, and shop and ancillary buildings. On the higher of these two surfaces, and to the West of the access road, there is a car park and also the building and plot of ground devoted to agricultural technology, as well as the literary studies and general purpose buildings. As a complement to these, there is a series of blocks, arranged in parallel rows, which house the administrative offices, the art school, the craft's school, the general classrooms, and those devoted to higher education. The fascinating aspect of this school is the outstanding penetration of the architect's mind into the essential function of the project. Its most evident merit is the sense of comradeship and harmony that permeates the whole architectural manifold.Antes de construir el complejo escolar «Palos Verdes» se comenzó por crear, en el terreno, dos grandes mesetas a niveles diferentes. Sobre el inferior se organizaron: los campos de juegos, de deportes, un aparcamiento, el edificio para educación física y los destinados a tiendas y servicios. Sobre la meseta superior, al oeste de la vía de acceso, se dispuso un aparcamiento y el edificio y campo para adiestramiento agrícola; al este, otro aparcamiento, el edificio dedicado a materias literarias, y el destinado a usos múltiples. Completan las instalaciones de la escuela una serie de bloques paralelos: la administración, la escuela de arte, las clases de trabajos manuales, las aulas de enseñanzas generales, y las de los cursos superiores. Lo fascinante de este complejo escolar es la perfecta y magistral compenetración del arquitecto con el tema proyectado, y su mayor mérito, la sensación de cordialidad y armonía con el ambiente.

  6. Capturing the design bases on Palo Verde

    International Nuclear Information System (INIS)

    Rogers, A.C.; Prawlocki, F.C.

    1989-01-01

    Over the past several years, the nuclear power industry has been directing considerable attention to plant configuration control. Utilities have been put in difficult situations due to changes made in plants without full original design basis knowledge. Once a plant is constructed, there is often insufficient information from the reactor designer or the architect/engineer to properly support operations, especially changes to the plant. In many cases utilities do not know the design bases for their units. As a result of these concerns, many utilities have been searching for ways to define the appropriate design bases for their plant. This paper discusses steps taken by Palo Verde to produce a design bases document and how it is being used to support the operation of the three nuclear units

  7. How Palo Verde saved millions of dollars

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    In autumn 1992, Arizona Public Service adopted new project control procedures for outages at its three-unit Palo Verde PWR site, including: the switch to a PC-based environment; a new scheduling system; and the generation of improved graphics for decision making. Major cost savings were made and three further outages have now benefitted from the new systems. (author)

  8. Aerial radiological survey of the Palo Verde Nuclear Generating Station and surrounding area, Wintersburg, Arizona. Date of survey: November 1982

    International Nuclear Information System (INIS)

    Semmler, R.A.

    1984-01-01

    An aerial survey of terrestrial gamma radiation was performed during the period 4 November through 15 November 1982 over a 16-kilometer by 16-kilometer (10-mile by 10-mile) area approximately centered on the Palo Verde Nuclear Generating Station near Wintersburg, Arizona. Gamma radiation spectral data were collected while flying a helicopter over a regular pattern of parallel lines spaced 150 meters (500 feet) apart at an altitude of 90 meters (300 feet). All radiation measurements taken at the nominal flight altitude were corrected for altitude variations, cosmic radiation, and helicopter background to generate exposure rates from terrestrial sources extrapolated to 1 meter above ground level. The data are presented as isoradiation contour maps. The average terrestrial radiation levels fall between 8 and 14 microrentgens per hour (μR/h). All gamma radiation detected within the survey area was associated with naturally occurring radionuclides. Direct ground-based measurements at 1 meter height were also taken at four scattered sites within the survey area. These values agree with the contour intervals determined from the aerial measurements and differ from the mean value of adjacent contours by no more than 10%. 6 references, 5 figures, 2 tables

  9. Palo Verde Unit 3 BMI nozzle modification

    International Nuclear Information System (INIS)

    Waskey, D.

    2015-01-01

    The 61 BMI (Bottom Mount Instrumentation) nozzles of the unit 3 of the Palo Verde plant have been examined through ASME Code Case N722. The nozzle 3 was the only one with leakage noted. The ultrasound testing results are characteristic of PWSCC (Primary Water Stress Corrosion Cracking). The initiation likely occurred at a weld defect which was exposed to the primary water environment resulting in PWSCC. All other nozzles (60) showed no unacceptable indications. Concerning nozzle 3 one crack in J-groove weld connected large defect to primary water. An environmental model has been used to simulate and optimize the repair. The AREVA crew was on site 18 days after contract award and the job was completed in 12 days, 30 hours ahead of baseline schedule. This series of slides describes the examination of the BMI nozzles, the repair steps, and alternative design concepts

  10. Response to IPE and IPEEE results at Palo Verde NGS

    International Nuclear Information System (INIS)

    Lindquist, R.C.

    1992-01-01

    Insights gained from the internal events probabilistic risk assessment (PRA) and from the pilot plant demonstration of the fire-induced vulnerability evaluation (FIVE) have been used to initiate corrective actions in the form of administrative controls, compensatory measures, and plant modifications to reduce the risks associated with significant core-damage sequences. Palo Verde was a pilot demonstration plant for the FIVE methodology developed by the Electrical Power Research Institute and sponsored by the Nuclear Utility Management and Resources Council. Several findings emerged from the application of FIVE and have been acted upon to reduce the impact of fire in several compartments of the plant

  11. Update-processing steam generator cleaning solvent at Palo Verde

    International Nuclear Information System (INIS)

    Peters, G.

    1996-01-01

    Framatome Technologies Inc.(FTI) recently completed the steam generator chemical cleanings at the Palo Verde Nuclear Generating Station Units 1, 2 and 3. Over 500,000 gallons of low-level radioactive solvents were generated during these cleanings and were processed on-site. Chemical cleaning solutions containing high concentrations of organic chelating wastes are difficult to reduce in volume using standard technologies. The process that was ultimately used at Palo Verde involved three distinct processing steps: The evaporation step was conducted using FTI's submerged combustion evaporator (SCE) that has also been successfully used at Arkansas Nuclear One - Unit 1, Three Mile Island - Unit 1, and Oconee on similar waste. The polishing step of the distillate used ultrafiltration (UF) and reverse osmosis (RO) technology that was also used extensively by Ontario Hydro to assist in their processing of chemical cleaning solvent. This technology, equipment, and operations personnel were provided by Zenon Environmental, Inc. The concentrate from the evaporator was absorbed with a special open-quotes peat mossclose quotes based media that allowed it to be shipped and buried at the Environcare of Utah facility. This is the first time that this absorption media or burial site has been used for chemical cleaning solvent

  12. Technical specifications, Palo Verde Nuclear Generating Station, Unit No. 2 (Docket No. 50-529). Appendix A to License No. NPF-51

    International Nuclear Information System (INIS)

    1986-04-01

    Information is presented concerning the technical specifications for the Palo Verde-2 Reactor. Areas of interest discussed in this report include: safety limits and limiting safety system settings; limiting conditions for operation and surveillance requirements; design features; and administrative controls. 19 figs., 62 tabs

  13. Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529 and STN 50-530): Final environmental statement

    International Nuclear Information System (INIS)

    1975-09-01

    The proposed action is the issuance of construction permits to the Arizona public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will be prominently devoted to station facilities. An additional 1200- to 1300-acre evaporation pond will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation in local ephemeral water courses. Stringent measures will be taken to minimize these effects. The total radiation dose to construction workers is estimated to be 15 man-rem. This dose is a small fraction of the approximately 470 man-rem which will be received by the construction force over the same period from natural background radiation. Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do result form the proposed action

  14. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1984-10-01

    Supplement No. 6 to the Safety Evaluation Report for the application filed by Arizona Public Service Company, et al., for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of (1) additional information submitted by the applicant since Supplement No. 5 was issued and (2) matters that the staff had under review when Supplement No. 5 was issued

  15. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530). Supplement No. 7

    International Nuclear Information System (INIS)

    1984-12-01

    Supplement No. 7 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of: (1) additional information submitted by the applicant since Supplement No. 6 was issued; and (2) matters that the staff had under review when Supplement No. 6 was issued

  16. Les enjeux écologiques de Palo Verde (Costa Rica

    Directory of Open Access Journals (Sweden)

    Bertrand LÉVY

    1992-09-01

    Full Text Available Près de Palo Verde a été créé un parc naturel. Un projet d’irrigation risque de perturber l’écologie de la région. Une carte de son écosystème a été établie par télédétection, pour évaluer l’impact d’un tel projet.

  17. Living With Parasites in Palo Verde National Park

    Directory of Open Access Journals (Sweden)

    Eben Kirksey

    2012-11-01

    Full Text Available Bruno Latour has tried to bring a parliamentary democracy to the domain of nature. Wading through the swamps of Palo Verde, a national park in the Guanacaste Province of Costa Rica, and wandering onto neighbouring agricultural lands, I failed to find a central place where people were speaking for nature. Departing from a failed attempt to speak for another species (the fringe-toed foam frog, this paper considers how diverging values and obligations shape relationships in multi-species worlds. As spokespersons articulated competing visions of nature on the borderlands of Palo Verde, multiple social and ecological worlds went to war. The haunting specter of capital joined the fray—animating the movements of cattle, grasses with animal rhizomes, rice seeds, and flighty ducks across national borders and through fragmented landscapes. Amidst this warfare, the fringe-toed foam frog was just one tenacious parasite, a noisy agent eating at the table of another, which began to flourish in worlds designed with the well-being of others in mind. Cattails, charismatic birds, and a multitude of insects began interrupting human dreams and schemes. Final solutions to the problem of living with parasites failed in Palo Verde. Humans and parasites, who became para-selves of one another, maintained an abiding presence in the landscape.

  18. Palo Verde Nuclear Generating Station Units 1, 2, and 3: Draft environmental statement (Docket Nos. STN 50-528, 529, and 530)

    International Nuclear Information System (INIS)

    1975-04-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Corporation for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2 and 3. Preparation of the 3880-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will be permanently devoted to station facilities. An additional 1200- to 1300-acre evaporation pond will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use (Sec. 4. 1). Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation in local ephemeral water courses. Stringent measures will be taken to minimize these effects (Sec. 4.5). Station, transmission line, and water pipeline construction will kill, remove displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects (Sec. 4.3 and 4.5). Approximately 60 acres of agricultural land will be temporarily affected by construction in transmission corridors. The great majority can be returned to that use upon completion of construction, thus the impact is considered minor. Similarly, most grazing lands affected along these corridors, as well as along the water pipeline corridor, can eventually be returned to that use. New archaeological resources could be discovered along the path of final transmission corridor alignments. The applicant will take measures to locate and protect such resources if they exist. 75 refs., 24 figs., 65 tabs

  19. Evaluation of a main steam line break with induced, multiple tube ruptures: A comparison of NUREG 1477 (Draft) and transient methodologies Palo Verde Nuclear Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, K.R.

    1995-09-01

    This paper presents the approach taken to analyze the radiological consequences of a postulated main steam line break event, with one or more tube ruptures, for the Palo Verde Nuclear Generating Station. The analysis was required to support the restart of PVNGS Unit 2 following the steam generator tube rupture event on March 14, 1993 and to justify continued operation of Units 1 and 3. During the post-event evaluation, the NRC expressed concern that Unit 2 could have been operating with degraded tubes and that similar conditions could exist in Units 1 and 3. The NRC therefore directed that a safety assessment be performed to evaluate a worst case scenario in which a non-isolable main steam line break occurs inducing one or more tube failures in the faulted steam generator. This assessment was to use the generic approach described in NUREG 1477, Voltage-Based Interim Plugging Criteria for Steam Generator Tubes - Task Group Report. An analysis based on the NUREG approach was performed but produced unacceptable results for off-site and control room thyroid doses. The NUREG methodology, however, does not account for plant thermal-hydraulic transient effects, system performance, or operator actions which could be credited to mitigate dose consequences. To deal with these issues, a more detailed analysis methodology was developed using a modified version of the Combustion Engineering Plant Analysis Code, which examines the dose consequences for a main steam line break transient with induced tube failures for a spectrum equivalent to 1 to 4 double ended guillotine U-tube breaks. By incorporating transient plant system responses and operator actions, the analysis demonstrates that the off-site and control room does consequences for a MSLBGTR can be reduced to acceptable limits. This analysis, in combination with other corrective and recovery actions, provided sufficient justification for continued operation of PVNGS Units 1 and 3, and for the subsequent restart of Unit 2.

  20. Evaluation of a main steam line break with induced, multiple tube ruptures: A comparison of NUREG 1477 (Draft) and transient methodologies Palo Verde Nuclear Generating Station

    International Nuclear Information System (INIS)

    Parrish, K.R.

    1995-01-01

    This paper presents the approach taken to analyze the radiological consequences of a postulated main steam line break event, with one or more tube ruptures, for the Palo Verde Nuclear Generating Station. The analysis was required to support the restart of PVNGS Unit 2 following the steam generator tube rupture event on March 14, 1993 and to justify continued operation of Units 1 and 3. During the post-event evaluation, the NRC expressed concern that Unit 2 could have been operating with degraded tubes and that similar conditions could exist in Units 1 and 3. The NRC therefore directed that a safety assessment be performed to evaluate a worst case scenario in which a non-isolable main steam line break occurs inducing one or more tube failures in the faulted steam generator. This assessment was to use the generic approach described in NUREG 1477, Voltage-Based Interim Plugging Criteria for Steam Generator Tubes - Task Group Report. An analysis based on the NUREG approach was performed but produced unacceptable results for off-site and control room thyroid doses. The NUREG methodology, however, does not account for plant thermal-hydraulic transient effects, system performance, or operator actions which could be credited to mitigate dose consequences. To deal with these issues, a more detailed analysis methodology was developed using a modified version of the Combustion Engineering Plant Analysis Code, which examines the dose consequences for a main steam line break transient with induced tube failures for a spectrum equivalent to 1 to 4 double ended guillotine U-tube breaks. By incorporating transient plant system responses and operator actions, the analysis demonstrates that the off-site and control room does consequences for a MSLBGTR can be reduced to acceptable limits. This analysis, in combination with other corrective and recovery actions, provided sufficient justification for continued operation of PVNGS Units 1 and 3, and for the subsequent restart of Unit 2

  1. Deposition and Accumulation of Emerging Contaminants in the Sediments of the Palos Verde Shelf, California

    Science.gov (United States)

    Deposition and Accumulation of Emerging Contaminants in the Sediments of the Palos Verde Shelf, California Mark G. Cantwell, David R. Katz, Julia Sullivan, Robert P. Eganhouse, Monique M. Perron, Robert M. Burgess The Palos Verdes shelf is located off the Southern California coa...

  2. 75 FR 48323 - Agency Information Collection Activities; Proposed Collection; Comment Request; Palos Verdes...

    Science.gov (United States)

    2010-08-10

    ..., quantity, and/or cooking method of fish species, (3) gather quantitative data that can be used to... anglers who fish in the Palos Verdes Shelf vicinity. Title: Palos Verdes Shelf Seafood Consumption Survey... deep for direct human contact; however, fish in the PV Shelf area bioaccumulate the contaminants...

  3. A convergence/divergence schema to identify impacts: The case of the Palo Verde nuclear generating station

    International Nuclear Information System (INIS)

    Pasqualetti, M.J.

    1984-01-01

    Until fairly recently, geographers have contributed only slightly to research on nuclear power plants. Most studies have dealt with ''site selection,'' though lately topics including socioeconomics, waste disposal, and emergency preparedness, have been addressed. Currently NRC-mandated investigations into many of the impacts of nuclear power plants tend to focus on local effects, but these often are not detailed and are only during the early planning stages. Little attention continues to be paid to questions of socioeconomic impacts and land use changes during or after construction. This limited approach is neither necessary nor imaginative, cohesive nor wise, because it fails to encompass or probe an appropriately wide geographical range of possible contributions. This traditionally small and parochial sphere of inquiry can be expanded by using the conceptual framework of convergence and divergence. Suggested examples include land use changes in value or function in association with various nuclear facilities, transportation and socioeconomic factors associated with the complexities of the nuclear fuel cycle, and the exportation of fuel and the nuclear fuel cycle, and the exportation of fuel and technology. The application of such a geographical perspective in the study of PVNGS illustrates the influence (often distant and unrecognized) which can follow a local decision to build a nuclear power plant

  4. 75 FR 9623 - Arizona Public Service Company, et al.; Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-03-03

    ... pressurized-water reactors located in Maricopa County, Arizona. 2.0 Request/Action Title 10 of the Code of... pressure boundary during normal operating and hydrostatic or leak rate testing conditions. Specifically, 10... NRC's March 16, 2001, SE, the staff noted, ``[t]he CE NSSS [nuclear steam supply system] methodology...

  5. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Dockets Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1987-03-01

    Supplement No. 11 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizone, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of (1) additional information submitted by the applicant since Supplement No. 10 was issued and (2) other matters requiring staff review since Supplenent No. 10 was issued, specifically those issues that required resolution before Unit 3 low-power licensing

  6. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530). Supplement No. 9

    International Nuclear Information System (INIS)

    1985-12-01

    Supplement No. 9 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of: (1) additional information submitted by the applicant since Supplement No. 8 was issued; and (2) matters that the staff had under review when Supplement No. 8 was issued, specifically those issues which required resolution prior to Unit 2 fuel loading and testing up to 5% of full power

  7. Safety evaluation report related to the operation of Palo Verde nuclear generating station, Units 1, 2, and 3. Docket Nos. STN 50-528, STN 50-529, and STN 50-530, Arizona Public Service Company

    International Nuclear Information System (INIS)

    1982-05-01

    On November 13, 1981, the Nuclear Regulatory Commission (NRC) staff issued its Safety Evaluation Report (SER) relating to the application for licenses to operate the Palo Verde Nuclear Generating Station, Unit Nos. 1, 2 and 3 (PVNGS 1-3); Supplement No. 1 to the SER was issued on February 4, 1982. In the SER and Supplement No. 1, the staff identified certain issues where either further information was required of the applicant or additional staff effort was necessary to complete the review of the application. The purpose of this supplement is to update the SER by providing (1) the evaluation of additional information submitted by the applicant since Supplement No. 1 to the SER was issued, and (2) the evaluation of the matters that the staff had under review and Supplement No. 1 was issued

  8. Options for In Situ Capping of Palos Verdes Shelf Contaminated Sediments

    National Research Council Canada - National Science Library

    Palermo, Michael; Schroeder, Paul; Rivera, Yilda; Ruiz, Carlos; Clarke, Doug; Gailani, Joe; Clausner, James; Hynes, Mary; Fredette, Thomas; Tardy, Barbara

    1999-01-01

    The U.S. Army Engineer Waterways Experiment Station (WES) has performed an evaluation of in situ capping options for sediment restoration of DDT and PCB contaminated sediments on the Palos Verdes (PV...

  9. Palo Verde Generating Station, Units 4 and 5. License application, general information

    International Nuclear Information System (INIS)

    1978-01-01

    A license application for two more Palo Verde reactors, Units 4 and 5, is presented. The two PWR reactors have a nominal net generating power each of 1,270 MW(e). Containments are steel-lined prestressed cylindrical structures with hemispherical domes. The reactors are replicas of Palo Verde 1, 2 and 3 (see DOCKETS 50528, 50529 and 50530) using the standard Combustion Engineering System 80 (see DOCKET-STN-50470)

  10. Use of probabilistic risk assessment in maintenance activities at Palo Verde

    International Nuclear Information System (INIS)

    Lindquist, R.C.; Pobst, D.S.

    1993-01-01

    Probabilistic risk assessment (PRA) is an important tool in addressing various maintenance activities. At the Palo Verde nuclear generating station (PVNGS), the PRA has been used in a variety of ways to support a wide and diverse selection of maintenance-related activities. For on-line or at-power maintenance, the PRA was used to evaluate combinations of maintenance activities possible with the 12-week or floating maintenance schedule. The maintenance schedule was evaluated to identify any higher risk, undesirable combinations of equipment outages, such as the sole steam-driven auxiliary feedwater pump and the same train emergency diesel generator. Table I is a sampling of the results from the maintenance schedule evaluation in terms of increase in conditional core damage frequency (CDF) above the base- line value due to maintenance on some important key safety systems and combinations thereof. The baseline CDF is 7.4 x 10 -7 per 72 h

  11. Final supplement to the final environmental statement related to construction of Palo Verde Nuclear Generating Station Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1976-02-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation local ephemeral water courses. Stringent measures will be taken to minimize these effects (Sec. 4.5). Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do results from the proposed action. 26 refs., 1 fig., 20 tabs

  12. Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529 and STN 50-530): Draft supplement to the Final environmental satement

    International Nuclear Information System (INIS)

    1975-11-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will be permanently devoted to station facilities. An additional 1200- to 1300-acre evaporation pond will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation in local ephemeral water courses. Stringent measures will be taken to minimize these effects. Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do result from the proposed action. The pumping of groundwater will cause a local drawdown of about 1 ft/yr, less than that currently occurring; hence, the impact is considered acceptable. 1 fig., 20 tabs

  13. Sediment transport on the Palos Verdes shelf, California

    Science.gov (United States)

    Ferre, B.; Sherwood, C.R.; Wiberg, P.L.

    2010-01-01

    Sediment transport and the potential for erosion or deposition have been investigated on the Palos Verdes (PV) and San Pedro shelves in southern California to help assess the fate of an effluent-affected deposit contaminated with DDT and PCBs. Bottom boundary layer measurements at two 60-m sites in spring 2004 were used to set model parameters and evaluate a one-dimensional (vertical) model of local, steady-state resuspension, and suspended-sediment transport. The model demonstrated skill (Brier scores up to 0.75) reproducing the magnitudes of bottom shear stress, current speeds, and suspended-sediment concentrations measured during an April transport event, but the model tended to underpredict observed rotation in the bottom-boundary layer, possibly because the model did not account for the effects of temperature-salinity stratification. The model was run with wave input estimated from a nearby buoy and current input from four to six years of measurements at thirteen sites on the 35- and 65-m isobaths on the PV and San Pedro shelves. Sediment characteristics and erodibility were based on gentle wet-sieve analysis and erosion-chamber measurements. Modeled flow and sediment transport were mostly alongshelf toward the northwest on the PV shelf with a significant offshore component. The 95th percentile of bottom shear stresses ranged from 0.09 to 0.16 Pa at the 65-m sites, and the lowest values were in the middle of the PV shelf, near the Whites Point sewage outfalls where the effluent-affected layer is thickest. Long-term mean transport rates varied from 0.9 to 4.8 metric tons m-1 yr-1 along the 65-m isobaths on the PV shelf, and were much higher at the 35-m sites. Gradients in modeled alongshore transport rates suggest that, in the absence of a supply of sediment from the outfalls or PV coast, erosion at rates of ???0.2 mm yr-1 might occur in the region southeast of the outfalls. These rates are small compared to some estimates of background natural sedimentation

  14. Tube structural integrity evaluation of Palo Verde Unit 1 steam generators for axial upper-bundle cracking

    International Nuclear Information System (INIS)

    Woodman, B.W.; Begley, J.A.; Brown, S.D.; Sweeney, K.; Radspinner, M.; Melton, M.

    1995-01-01

    The analysis of the issue of upper bundle axial ODSCC as it apples to steam generator tube structural integrity in Unit 1 at the Palo Verde Nuclear generating Station is presented in this study. Based on past inspection results for Units 2 and 3 at Palo Verde, the detection of secondary side stress corrosion cracks in the upper bundle region of Unit 1 may occur at some future date. The following discussion provides a description and analysis of the probability of axial ODSCC in Unit 1 leading to the exceedance of Regulatory Guide 1.121 structural limits. The probabilities of structural limit exceedance are estimated as function of run time using a conservative approach. The chosen approach models the historical development of cracks, crack growth, detection of cracks and subsequent removal from service and the initiation and growth of new cracks during a given cycle of operation. Past performance of all Palo Verde Units as well as the historical performance of other steam generators was considered in the development of cracking statistics for application to Unit 1. Data in the literature and Unit 2 pulled tube examination results were used to construct probability of detection curves for the detection of axial IGSCC/IGA using an MRPC (multi-frequency rotating panake coil) eddy current probe. Crack growth rates were estimated from Unit 2 eddy current inspection data combined with pulled tube examination results and data in the literature. A Monte-Carlo probabilistic model is developed to provide an overall assessment of the risk of Regulatory Guide exceedance during plant operation

  15. Assessment of vibration anomalies of main steam lines at Palo Verde-3

    International Nuclear Information System (INIS)

    Amr, A.; Landstrom, C.; Maxwell, H.; Miller, J.S.; Lynch, J.J.

    1996-01-01

    Historically, flow induced vibration in piping systems that transport liquid has presented problems for plant designers. When evaluating a vibration problem, it is always important to determine the forcing frequencies from different phenomena and the natural frequencies of the system as an integral part of establishing the root cause of the problem. Since in most cases of large vibration and noise levels, the natural frequency of the system and the frequency of the flow induced vibration are very close, determining the natural frequency of the system is important. Palo Verde Unit-3 exhibited a vibration problem where identification of the root cause was difficult. A Palo Verde team was created which consisted of engineers from different on-site departments and support from consultants. The process used to determine the root cause for the vibration/noise problem on Main Steam Supply System (MSSS) steam line 2 at Palo Verde Unit 3 is discussed in this paper. Since the root cause was not readily apparent, a finite element model was constructed to determine the natural frequency of the piping system. The finite element model consisted of a portion of the main steam lines, including a sample line which traverses the main steam line

  16. Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530): Final environmental statement

    International Nuclear Information System (INIS)

    1982-02-01

    The proposed action is the issuance of operating licenses to the Arizona Public Service Company (APS, applicant) for the startup and operation of PVNGS, Units 1, 2, and 3, located in Maricopa County, about 24 km (15 mi) west of Buckeye, Arizona. The information in this statement represents the second assessment of the environmental impact associated with PVNGS Units 1, 2, and 3 pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations (10 CFR) Part 51 of the Commissions's Regulations. After receiving an application in July 1974 to construct this station, the staff carried out a review of impacts that would occur during its construction and operation. That evaluation was issued as a Final Environmental Statement/emdash/Construction Phase (FES-CP). After this environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and public hearings in Phoenix, Arizona, the US Nuclear Regulatory Commission issued Construction Permits Nos. CPPR-141, CPPR-142, and CPPR-143 for the construction of PVNGS Units 1, 2, and 3. As of September 1981, the construction of Unit 1 was about 92 percent complete, Unit 2 was 68 percent complete, and Unit 3 was 26 percent complete. 11 figs., 21 tabs

  17. Palos Verdes Shelf oceanographic study; data report for observations December 2007–April 2008

    Science.gov (United States)

    Rosenberger, Kurt J.; Noble, Marlene A.; Sherwood, Christopher R.; Martini, Marinna M.; Ferreira, Joanne T.; Montgomery, Ellyn T.

    2011-01-01

    Beginning in 1997, the Environmental Protection Agency (EPA) defined a contaminated section of the Palos Verdes Shelf region in southern California as a Superfund Site, initiating a continuing investigation of this area. The investigation involved the EPA, the U.S. Geological Survey (USGS), Science Applications International Corporation (SAIC), Los Angeles County Sanitation Districts (LACSD) data, and other allied agencies. In mid-2007, the Palos Verdes Shelf project team identified the need for additional data on the sediment properties and oceanographic conditions at the Palos Verdes Superfund Site and deployed seven bottom platforms, three subsurface moorings, and three surface moorings on the shelf. This additional data was needed to support ongoing modeling and feasibility studies and to improve our ability to model the fate of the effluent-affected deposit over time. It provided more detail on the spatial variability and magnitude of resuspension of the deposit during multiple storms that are expected to transit the region during a winter season. The operation began in early December 2007 and ended in early April 2008. The goal was to measure the sediment response (threshold of resuspension, suspended-sediment concentrations, and suspended-sediment transport rates) to bed stresses associated with waves and currents. Other objectives included determining the structure of the bottom boundary layer (BBL) relating nearbed currents with those measured at 10 m above bottom (mab) and comparing those with the long-term data from the LACSD Acoustic Doppler Current Profiler (ADCP) deployments for nearbed current speed and direction. Low-profile tripods with high-frequency ADCPs co-located with two of the large tripods were selected for this goal. This report describes the data obtained during the field program, the instruments and data-processing procedures used, and the archive that contains the data sets that have passed our quality-assurance procedures.

  18. Macroinvertebrados bentónicos del humedal de Palo Verde, Costa Rica

    Directory of Open Access Journals (Sweden)

    F.A Trama

    2009-11-01

    Full Text Available El humedal de Palo Verde es uno de los más importantes de Centro America para aves acuáticas. Durante el período 2002 y 2005, se llevaron a cabo actividades de manejo para controlar la invasión de Typha domingensis. Con el fin de establecer una línea base para monitoreos futuros, en el 2003 se realizó una evaluación de macroinvertebrados acuáticos. Se efectuó un muestreo mensual durante un año, usando el método de sustratos artificiales. Se identificaron 116 táxones pertenecientes a 47 familias y a 18 órdenes. La mayor abundancia se encontró en la clase Conchostraca y la familia Chironomidae que juntas representaron casi la mitad de todos los individuos colectados. En contraste, el 97% de los táxones tuvieron, cada uno, menos del 1% del total de la abundancia. La diversidad de táxones, así como la abundancia de individuos y el número de especies, fueron mayores en la época seca que en la lluviosa. La curva acumulada de especies indicó que se hubiera registrado una mayor cantidad de táxones si los muestreos se hubieran extendido por más tiempo. Con este trabajo damos a conocer la primera lista de macroinvertebrados para el humedal de Palo Verde.Benthic macroinvertebrates of the Palo Verde wetland, Costa Rica. Palo Verde, Costa Rica, is one of the most important wetlands in the region now recovering from some invasive plants, especially Typha domingensis, and monitoring programs were started, including studies on the aquatic macoinvertebrate fauna. We sampled benthic macroinvertebrates monthly for more than a year with artificial substrates, and identified 116 taxa from 57 families and 18 orders, with 90 morfospecies of insects. The highest abundances were in the class Conchostraca (typical in seasonal wetlands and in the family Chironomidae (Diptera, Insecta, which together represent almost half of all individuals collected. In contrast, 97 taxa were less than 1% of total abundance each. Number of individuals and number of

  19. Remote handling and robotic inspections of Palo Verde reactor vessel internals

    International Nuclear Information System (INIS)

    Ryder, W.

    1998-01-01

    Remote visual examinations and handling evolutions in high radiation field environments have required the use of radiation tolerant video systems. These systems involve significant expense and potentially require large envelope deployment structures. Recent events at Palo Verde including Upper Guide Structure damage and Reactor Vessel In-Service Inspections have provided opportunities for research, design and utilization of alternative approaches. Most significant of these, utilization of CCD modules with high magnification capabilities, have produced higher quality viewing, reduced maintenance expenditures, and rapid deployment intervals. (orig.) [de

  20. Macroinvertebrados bentónicos del humedal de Palo Verde, Costa Rica

    Directory of Open Access Journals (Sweden)

    F.A Trama

    2009-11-01

    Full Text Available El humedal de Palo Verde es uno de los más importantes de Centro America para aves acuáticas. Durante el período 2002 y 2005, se llevaron a cabo actividades de manejo para controlar la invasión de Typha domingensis. Con el fin de establecer una línea base para monitoreos futuros, en el 2003 se realizó una evaluación de macroinvertebrados acuáticos. Se efectuó un muestreo mensual durante un año, usando el método de sustratos artificiales. Se identificaron 116 táxones pertenecientes a 47 familias y a 18 órdenes. La mayor abundancia se encontró en la clase Conchostraca y la familia Chironomidae que juntas representaron casi la mitad de todos los individuos colectados. En contraste, el 97% de los táxones tuvieron, cada uno, menos del 1% del total de la abundancia. La diversidad de táxones, así como la abundancia de individuos y el número de especies, fueron mayores en la época seca que en la lluviosa. La curva acumulada de especies indicó que se hubiera registrado una mayor cantidad de táxones si los muestreos se hubieran extendido por más tiempo. Con este trabajo damos a conocer la primera lista de macroinvertebrados para el humedal de Palo Verde.

  1. DDE in sediments of the Palos Verdes shelf, California: In situ transformation rates and geochemical fate

    Science.gov (United States)

    Eganhouse, R.P.; Pontolillo, J.

    2008-01-01

    From 1947 to 1971 the world's largest manufacturer of DDT discharged process wastes into the sewers of Los Angeles County. Roughly 870-1450 t of DDT were released to the ocean off Palos Verdes, CA, a portion of which (???100 t) resides in sediments on the continental shelf and slope. The most abundant DDT compound in the sediments, p,p???-DDE, is degrading by reductive dechlorination, butthe rate of transformation and factors controlling it are not well understood. In order to estimate in situ transformation rates and predict the long-term fate of p,p???-DDE, box cores were collected in 1992 and 2003 from a single location on the Palos Verdes Shelf and analyzed for 8 DDT compounds and 84 polychlorinated biphenyl (PCB) congeners. The PCBs show no evidence of dechlorination, and inventories did not change between 1992 and 2003. By contrast, the inventory of p,p???-DDE decreased by 43%, whereas that of p,p???-DDMU, the putative reductive dechlorination product increased by 34%. The first-order transformation rate for p,p???-DDE at the study site is 0.051 ?? 0.006 yr-1. A multistep reaction model suggests that inventories of p,p???-DDE and p,p???-DDMU will continue to decline, whereas that of p,p???-DDNU will reach a maximum around 2014.

  2. Depositional history of organic contaminants on the Palos Verdes Shelf, California

    Science.gov (United States)

    Eganhouse, R.P.; Pontolillo, J.

    2000-01-01

    During more than 60 years, sedimentation on the Palos Verdes Shelf has been dominated by time-varying inputs of municipal wastewater from the Los Angeles County Sanitation Districts (LACSD) and debris from the Portuguese Bend Landslide (PBL). The present study examines the depositional history of wastewater-derived organic contaminants at a site approximately 6-8 km downcurrent from the outfall system. Sediments at this location are impacted by contributions from both sources, but the relative influence of the sources has changed over time. Two classes of hydrophobic organic contaminants (chlorinated hydrocarbons, long-chain alkylbenzenes) were determined in sediment cores collected in 1981 and 1992. Using molecular stratigraphy, we determined average sedimentation rates (cm/year) and mass accumulation rates (g cm-2 year-1) for the following periods: 1955-1965, 1965-1971, 1971-1981 and 1981-1992. The results show that sedimentation and mass accumulation rates increased from 1955 to 1971 and decreased from 1971 to 1981. These trends are consistent with historical information on the emission of suspended solids from the outfall system, indicating that the discharge of wastes dominated sedimentation at the site during this period. In the 1980s and early 1990s, however, mass accumulation rates increased in spite of continually decreasing emissions of wastewater solids. Several lines of evidence indicate that this increase was due to mobilization of debris from the PBL during and after unusually strong winter storms in the 1980s. As a result, heavily contaminated sediments deposited during the years of greatest waste emissions (i.e. 1950-1970) have been buried to greater sub-bottom depths, thereby reducing their availability for mobilization to the overlying water column. These results highlight the dynamic nature of sedimentation in contaminated coastal ecosystems and its importance to the long-term fate and effects of toxic substances.

  3. Currents, temperature, conductivity, attenuation, and sigma-theta data from moorings deployed off the coast of Palos Verdes, CA from platforms VICKERS and ROBERT GORDON SPROUL from May 21, 1992 and March 30, 1993 (NODC Accession 0067573)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The sediments on the shelf off Palos Verdes CA are contaminated with large amounts of DDT. Moorings were deployed on the shelf in the winter of 1993 in part to...

  4. Spatial distribution of Guaiacum sanctum (Zygophyllaceae seedlings and saplings relative to canopy cover in Palo Verde National Park, Costa Rica

    Directory of Open Access Journals (Sweden)

    Eric J. Fuchs

    2013-09-01

    Full Text Available The spatial distribution of individuals is a fundamental property of most species and constitutes essential information for the development of restoration and conservation strategies, especially for endangered plant species. In this paper we describe the spatial distribution of different size classes of the endangered tropical tree Guaiacum sanctum and the effect of canopy cover on spatial aggregation. Adult G. sanctum were located and mapped in a 50ha plot in Palo Verde National Park, Costa Rica. Seedlings, saplings and juveniles were mapped to the nearest centimetre and permanently marked in three 50x50m subplots. Within each subplot spatial aggregation was assessed using Ripley’s K statistic and canopy opening readings were performed every 5m using a densitometer. Kriging spatial interpolation and Monte Carlo simulations were used to determine if average canopy cover differed among size classes. Individuals of G. sanctum were spatially aggregated at all size classes with seedlings being the most frequent size class in all subplots. Seedlings were found predominantly in areas with significantly higher canopy cover. In contrast, juveniles were more likely found in areas with higher light availability. The high number of seedlings, saplings, and juveniles relative to adults suggests that populations of G. sanctum in PVNP are expanding. Light availability and canopy structure are important factors shaping the spatial distribution of this species. The contemporary demographic structure of G. sanctum is dependent on forest gap dynamics and changes in human disturbance during the past 25 years.

  5. Core Follow Calculation for Palo Verde Unit 1 in Cycles 1 through 4 using DeCART2D/MASTER4.0 Code System

    International Nuclear Information System (INIS)

    Jeong, Hee Jeong; Choi, Yonghee; Kim, Sungmin; Lee, Kyunghoon

    2017-01-01

    To verify and validate the DeCART2D/MASTER4.0 design system, core follow calculations of Palo Verde Unit 1(PV-1) in cycles 1 through 4 are performed. The calculation results are compared with the measured data and will be used in the generation of bias and uncertainty factors in the DeCART2D/MASTER4.0 design system. The DeCART2D/MASTER codes system has been developed in KAERI for the PWR (Pressurized water reactors) core design including SMRs (Small Modular Reactors). Core follow calculations of Pale Verde Unit 1 in Cycles 1 through 4 have been performed. Reactivities, assembly powers and startup parameters such as EPC, RW, ITC and IBW are compared with the measured data. This work will be used in the generation of bias and uncertainty factors in DeCART2D/MASTER4.0 design system.

  6. Laguna Verde: the nuclear debate in Mexico

    International Nuclear Information System (INIS)

    Weinberg, Bill.

    1987-01-01

    Mexico in planning to start up its first nuclear power station at Laguna Verde in the state of Veracruz (1988). The history of the plant is traced; it should have been finished by 1974. Both the fuel and the technology have been imported from the United States for Laguna Verde. The design, a Mark II Boiling Water Reactor, is controversial and there are doubts as to its safety. Opposition to the plant on safety and environmental grounds has grown. In April 1987 a 'Chernobyl anniversary' demonstration had 10,000 protesters and opponents of the plant are becoming more militant. The main opposition is from environmental and 'Green' groups but also includes intellectuals. However, politically, Mexico would find it embarrassing to cancel the plant and also it wants to be seen as a 'First World' rather than a 'Third World' country. (U.K.)

  7. CARACTERIZACIÓN ESTRUCTURAL DEL MANGLAR EN EL ESTERO PALO VERDE, LAGUNA DE CUYUTLÁN, COLIMA

    Directory of Open Access Journals (Sweden)

    Citlalli P. Téllez-García

    2012-01-01

    Full Text Available En el Estero Palo Verde, ubicado en el vaso IV de la Laguna de Cuyutlán, estado de Colima, se establecieron 48 unidades de muestreo (UM en tres rodales de mangle: 10 UM en rodal monoespecífico de Laguncularia racemosa, 25 UM en rodal monoespecífico de Rhizophora mangle y 13 UM en rodal mixto de L. racemosa-R. mangle. Se registró altura del dosel, diámetro del tronco, densidad de adultos y de repoblación, también se calculó área basal y volumen de madera. Los resultados indicaron que la densidad, área basal y volumen, para la categoría diamétrica (CD de 5 cm fueron significativamente diferentes (P < 0.05 entre los rodales monoespecíficos de R. mangle (2,500 árboles•ha-1, 4.2 m2•ha-1 y 22 m3•ha-1, respectivamente y L. racemosa (700 árboles•ha-1, 1.9 m2•ha-1 y 10 m3•ha-1, respectivamente. En las CD de 20 a 30 cm, el área basal fue significativamente mayor (P < 0.05 en el rodal monoespecífico de L. racemosa (1.6 - 3.8 m2•ha-1 que en el mixto de L. racemosa-R. mangle (0.5 - 2.5 m2•ha-1. La repoblación natural fue más abundante en el rodal de R. mangle (138 a 270 individuos•ha-1 que en el de L. racemosa (70 a 80 individuos•ha-1. Los valores estructurales mayores se alcanzaron para altura del dosel (10 m en el rodal de L. racemosa; para diámetro (40 cm y área basal (14.1 m2•ha-1 en el rodal de L. racemosa-R. mangle; y para repoblación natural (624 individuos•ha-1 en el rodal de R. mangle.

  8. Currents, wind speed, wind direction, temperature, attenuation, conductivity, and sigma-theta data from moorings deployed off the coast of Palos Verdes, CA from platforms ROBERT GORDON SPROUL, SEAWATCH, and YELLOWFIN from February 15, 2004 to July 8, 2004 (NODC Accession 0067574)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Palos Verdes shelf near Los Angeles is contaminated with DDT and PCBs discharged through the White Point ocean outfalls, mostly prior to 1971. The U. S....

  9. Currents, temperature, conductivity, attenuation, sigma-theta, and wave statistics data from moorings deployed off the coast of Palos Verdes, CA from platforms ROBERT GORDON SPROUL, YELLOWFIN, and SEA WATCH from December 3, 2007 to April 29, 2008 (NODC Accession 0067575)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Palos Verdes shelf near Los Angeles is contaminated with DDT and PCBs discharged through the White Point ocean outfalls, mostly prior to 1971. The U. S....

  10. Records of continental slope sediment flow morphodynamic responses to gradient and active faulting from integrated AUV and ROV data, offshore Palos Verdes, southern California Borderland

    Science.gov (United States)

    Maier, Katherine L.; Brothers, Daniel; Paull, Charles K.; McGann, Mary; Caress, David W.; Conrad, James E.

    2016-01-01

    Variations in seabed gradient are widely acknowledged to influence deep-water deposition, but are often difficult to measure in sufficient detail from both modern and ancient examples. On the continental slope offshore Los Angeles, California, autonomous underwater vehicle, remotely operated vehicle, and shipboard methods were used to collect a dense grid of high-resolution multibeam bathymetry, chirp sub-bottom profiles, and targeted sediment core samples that demonstrate the influence of seafloor gradient on sediment accumulation, depositional environment, grain size of deposits, and seafloor morphology. In this setting, restraining and releasing bends along the active right-lateral Palos Verdes Fault create and maintain variations in seafloor gradient. Holocene down-slope flows appear to have been generated by slope failure, primarily on the uppermost slope (~ 100–200 m water depth). Turbidity currents created a low relief (water depositional systems. These results help to bridge gaps in scale between existing deep-sea and experimental datasets and may provide constraints for future numerical modeling studies.

  11. Transient analysis for Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Ramos Pablos, J.C. et.al.

    1991-01-01

    Relationship between transients analysis and safety of Laguna Verde nuclear power plant is described a general panorama of safety thermal limits of a nuclear station, as well as transients classification and events simulation codes are exposed. Activities of a group of transients analysis of electrical research institute are also mentioned (Author)

  12. Assessment of 1-chloro-4-[2,2-dichloro-1-(4-chlorophenyl)ethenyl]benzene (DDE) Transformation Rates on the Palos Verdes Shelf, CA

    Science.gov (United States)

    Eganhouse, Robert P.; Pontolillo, James

    2008-01-01

    In 1953, the world's largest producer of DDT, Montrose Chemical Corporation, began to discharge process wastes into sewers of the Los Angeles County Sanitation Districts (LACSD), California. By 1971, when the sewer connection was terminated, approximately 1,500-2,000 metric tons of DDT had been introduced to the LACSD treatment plant in Carson, CA. After treatment, effluent from this plant was released to the ocean through a submarine outfall system on the Palos Verdes Shelf (PVS) near Los Angeles, resulting in the accumulation of highly contaminated marine sediments. Numerous investigations of the PVS have been undertaken since the late 1960s, but few have focused on the biogeochemical fate of DDT and its transformation products. In the early 1990s, it was shown that DDE, the major DDT compound in the sediments, was being reductively dechlorinated by microorganisms resident in sediments on the PVS. The U.S. Geological Survey undertook a study in cooperation with the U.S. Environmental Protection Agency to provide a better understanding of the range of reductive dechlorination rates on the PVS and the environmental factors that control them. Existing data show that rates of reductive dechlorination are variable spatially. A comparison of data from two cores collected approximately 7 kilometers downcurrent from the outfall systems in 1992 and 2003 yielded an average first-order transformation rate of approximately 0.05 yr-1. A multistep reaction model suggests that inventories of DDE in PVS sediments at the study site will continue to decline, whereas the inventory of the metabolite DDNU will reach a maximum around 2014.

  13. The Palos Verdes Fault offshore southern California: late Pleistocene to present tectonic geomorphology, seascape evolution and slip rate estimate based on AUV and ROV surveys

    Science.gov (United States)

    Brothers, Daniel S.; Conrad, James E.; Maier, Katherine L.; Paull, Charles K.; McGann, Mary L.; Caress, David W.

    2015-01-01

    The Palos Verdes Fault (PVF) is one of few active faults in Southern California that crosses the shoreline and can be studied using both terrestrial and subaqueous methodologies. To characterize the near-seafloor fault morphology, tectonic influences on continental slope sedimentary processes and late Pleistocene to present slip rate, a grid of high-resolution multibeam bathymetric data, and chirp subbottom profiles were acquired with an autonomous underwater vehicle (AUV) along the main trace of PVF in water depths between 250 and 600 m. Radiocarbon dates were obtained from vibracores collected using a remotely operated vehicle (ROV) and ship-based gravity cores. The PVF is expressed as a well-defined seafloor lineation marked by subtle along-strike bends. Right-stepping transtensional bends exert first-order control on sediment flow dynamics and the spatial distribution of Holocene depocenters; deformed strata within a small pull-apart basin record punctuated growth faulting associated with at least three Holocene surface ruptures. An upper (shallower) landslide scarp, a buried sedimentary mound, and a deeper scarp have been right-laterally offset across the PVF by 55 ± 5, 52 ± 4 , and 39 ± 8 m, respectively. The ages of the upper scarp and buried mound are approximately 31 ka; the age of the deeper scarp is bracketed to 17–24 ka. These three piercing points bracket the late Pleistocene to present slip rate to 1.3–2.8 mm/yr and provide a best estimate of 1.6–1.9 mm/yr. The deformation observed along the PVF is characteristic of strike-slip faulting and accounts for 20–30% of the total right-lateral slip budget accommodated offshore Southern California.

  14. Safety evaluation of the Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Delgado G, J.L.

    1991-01-01

    The present work describe the licensing process for the first nuclear power plant built in Mexico, it presents the difficulties found during the several years of construction and tests until the phrase a level of safety equivalent to that of the country of origin of the nuclear steam supply system could be applicable to Laguna Verde, at least from the point of view of the mexican regulatory body, and also that this statement could be signed for the inspectors of international organizations. (author)

  15. Prototype fuel fabrication for nuclear reactors of Laguna Verde

    International Nuclear Information System (INIS)

    Nocetti, C.; Torres, J.; Medrano, A.

    1996-01-01

    Four prototype fuel bundles for the Laguna Verde Nuclear Power Plant have been fabricated. the type of nuclear fuel produced is described and the process used is commented. As an example of the fabrication criteria adopted, the production model to determine the density of the U O 2 pellets for the different batches of ceramic powder is described. the results are evaluated using the statistical indexes C p and C pk . (author)

  16. Potential depletion of surface water in the Colorado River and agricultural drains by groundwater pumping in the Parker-Palo Verde-Cibola area, Arizona and California

    Science.gov (United States)

    Leake, Stanley A.; Owen-Joyce, Sandra J.; Heilman, Julian A.

    2013-01-01

    Water use along the lower Colorado River is allocated as “consumptive use,” which is defined to be the amount of water diverted from the river minus the amount that returns to the river. Diversions of water from the river include surface water in canals and water removed from the river by pumping wells in the aquifer connected to the river. A complication in accounting for water pumped by wells occurs if the pumping depletes water in drains and reduces measured return flow in those drains. In that case, consumptive use of water pumped by the wells is accounted for in the reduction of measured return flow. A method is needed to understand where groundwater pumping will deplete water in the river and where it will deplete water in drains. To provide a basis for future accounting for pumped groundwater in the Parker-Palo Verde-Cibola area, a superposition model was constructed. The model consists of three layers of finite-difference cells that cover most of the aquifer in the study area. The model was run repeatedly with each run having a pumping well in a different model cell. The source of pumped water that is depletion of the river, expressed as a fraction of the pumping rate, was computed for all active cells in model layer 1, and maps were constructed to understand where groundwater pumping depletes the river and where it depletes drains. The model results indicate that if one or more drains exist between a pumping well location and the river, nearly all of the depletion will be from drains, and little or no depletion will come from the Colorado River. Results also show that if a well pumps on a side of the river with no drains in the immediate area, depletion will come from the Colorado River. Finally, if a well pumps between the river and drains that parallel the river, a fraction of the pumping will come from the river and the rest will come from the drains. Model results presented in this report may be considered in development or refinement of strategies

  17. Severe Accident Simulation of the Laguna Verde Nuclear Power Plant

    Directory of Open Access Journals (Sweden)

    Gilberto Espinosa-Paredes

    2012-01-01

    Full Text Available The loss-of-coolant accident (LOCA simulation in the boiling water reactor (BWR of Laguna Verde Nuclear Power Plant (LVNPP at 105% of rated power is analyzed in this work. The LVNPP model was developed using RELAP/SCDAPSIM code. The lack of cooling water after the LOCA gets to the LVNPP to melting of the core that exceeds the design basis of the nuclear power plant (NPP sufficiently to cause failure of structures, materials, and systems that are needed to ensure proper cooling of the reactor core by normal means. Faced with a severe accident, the first response is to maintain the reactor core cooling by any means available, but in order to carry out such an attempt is necessary to understand fully the progression of core damage, since such action has effects that may be decisive in accident progression. The simulation considers a LOCA in the recirculation loop of the reactor with and without cooling water injection. During the progression of core damage, we analyze the cooling water injection at different times and the results show that there are significant differences in the level of core damage and hydrogen production, among other variables analyzed such as maximum surface temperature, fission products released, and debris bed height.

  18. Modernization of the turbo in the Laguna Verde Nuclear Power Plant; Modernizacion del turbogrupo en la Central Nuclear de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Liebana, B.; Merino, A.; Cobos, A.; Gonzalez, J. J.

    2010-07-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This paper describes the first phase of the project.

  19. New aspects in the radiological emergency plan outside the Nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Alva L, S.

    1991-01-01

    The Mexican government through the National Commission of Nuclear Safety and Safeguards has imposed to the Federal Commission of Electricity to fulfill the requirement of having a functional Emergency Plan and under the limits that the regulator organisms in the world have proposed. The PERE (Plan of External Radiological Emergency) it has been created for the Nuclear Power station of Laguna Verde, Mexico

  20. Proposal for implementation of alternative source term in the nuclear power plant of Laguna Verde; Propuesta de implementacion del termino fuente alternativo en la central nuclear Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Bazan L, A.; Lopez L, M.; Vargas A, A.; Cardenas J, J. B. [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Km. 7.5 Carretera Veracruz-Medellin, Dos Bocas, Veracruz (Mexico)], e-mail: ariadna.bazan@cfe.gob.mx

    2009-10-15

    In 2010 the nuclear power plant of Laguna Verde will implement the extended power upbeat in both units of the plant. Agree with methodology of NEDC-33004P-A, (constant pressure power up rate), and the source term of core, for accidents evaluations, were increased in proportion to the ratio of power level. This means that for the case of a design basis accident of loss of coolant an increase of power of 15% originated an increase of 15% in dose to main control room. Using the method of NEDC-33004P-A to extended power upbeat conditions was determined that the dose value to main control room is very near to regulatory limit established by SRP 6.4. By the above and in order to recover the margin, the nuclear power plant of Laguna Verde will calculate an alternative source term following the criteria established in RG 1.183 (alternative radiological source term for evaluating DBA at nuclear power reactor). This approach also have a more realistic dose value using the criterion of 10-CFR-50.67, in addition is predicted to get the benefit of additional operational flexibilities. This paper present the proposal of implementing the alternative source term in Laguna Verde. (Author)

  1. Design optimization for fuel reloading in Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Cortes Campos, C.C.; Montes Tadeo, J.L.

    1991-01-01

    Procedure followed to perform the design optimation in fuel reloading is described in general words and also is shown an example in which such procedure was uses for analysis of BWR type reactor in unit 1 of Laguna Verde nuclear power plant (Author)

  2. Modernization of the turbo in the Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Liebana, B.; Merino, A.; Cobos, A.; Gonzalez, J. J.

    2010-01-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This paper describes the first phase of the project.

  3. Validation of SIMULATE-3K for stability analysis of Laguna Verde nuclear plant

    Energy Technology Data Exchange (ETDEWEB)

    Castillo, Rogelio, E-mail: rogelio.castillo@inin.gob.mx [Instituto Nacional de Investigaciones Nucleares, Carretera México-Toluca s/n, La Marquesa, Ocoyoacac, Estado de México 52750 (Mexico); Alonso, Gustavo, E-mail: gustavo.alonso@inin.gob.mx [Instituto Nacional de Investigaciones Nucleares, Carretera México-Toluca s/n, La Marquesa, Ocoyoacac, Estado de México 52750 (Mexico); Instituto Politecnico Nacional, Unidad Profesional Adolfo Lopez Mateos, Ed. 9, Lindavista, D.F. 07300 (Mexico); Ramírez, J. Ramón, E-mail: ramon.ramirez@inin.gob.mx [Instituto Nacional de Investigaciones Nucleares, Carretera México-Toluca s/n, La Marquesa, Ocoyoacac, Estado de México 52750 (Mexico)

    2013-12-15

    Highlights: • Neutronic/thermal hydraulic event in Laguna Verde is modeled. • A good agreement is obtained between SIMULATE-3K results and data plant for frequency and DR. • Other noise analysis techniques are used for the same purpose with good agreement. • Validation of SIMULATE-3K for stability analysis of Laguna Verde is confirmed - Abstract: Boiling Water Reactors are two phase flow systems which are susceptible to different types of flow instabilities. Among these are the coupled neutronic/thermal-hydraulic instabilities, these may compromise established fuel safety limits. These instabilities are characterized by periodic core-power and hydraulic oscillations. SIMULATE-3K code has been tested for stability analysis for several benchmarks, however to qualify the SIMULATE-3K code for a particular power plant a specific reactor plant analysis must be done. In this paper, the plant model of Laguna Verde Nuclear Power Plant is built and SIMULATE-3K is tested against the 1995 coupled neutronic/thermal-hydraulic instability event of Laguna Verde. Results obtained show the adequacy of this code to specific Laguna Verde power plant stability analysis.

  4. Laguna Verde nuclear power plant: an experience to consider in advanced BWR design

    International Nuclear Information System (INIS)

    Fuentes Marquez, L.

    2001-01-01

    Laguna Verde is a BWR 5 containment Mark II. Designed by GE, two external re-circulation loops, each of them having two speed re-circulation pump and a flow control valve to define the drive flow and consequently the total core flow an power control by total core flow. Laguna Verde Design and operational experience has shown some insights to be considering in design for advanced BRW reactors in order to improve the potential of nuclear power plants. NSSS and Balance of plant design, codes used to perform nuclear core design, margins derived from engineering judgment, at the time Laguna Verde designed and constructed had conducted to have a plant with an operational license, generating with a very good performance and availability. Nevertheless, some design characteristics and operational experience have shown that potential improvements or areas of opportunity shall be focused in the advanced BWR design. Computer codes used to design the nuclear core have been evolved relatively fast. The computers are faster and powerful than those used during the design process, also instrumentation and control are becoming part of this amazing technical evolution in the industry. The Laguna Verde experience is the subject to share in this paper. (author)

  5. Internal event analysis of Laguna Verde Unit 1 Nuclear Power Plant. System Analysis

    International Nuclear Information System (INIS)

    Huerta B, A.; Aguilar T, O.; Nunez C, A.; Lopez M, R.

    1993-01-01

    The Level 1 results of Laguna Verde Nuclear Power Plant PRA are presented in the I nternal Event Analysis of Laguna Verde Unit 1 Nuclear Power Plant , CNSNS-TR-004, in five volumes. The reports are organized as follows: CNSNS-TR-004 Volume 1: Introduction and Methodology. CNSNS-TR-004 Volume 2: Initiating Event and Accident Sequences. CNSNS-TR-004 Volume 3: System Analysis. CNSNS-TR-004 Volume 4: Accident Sequence Quantification and Results. CNSNS-TR-004 Volume 5: Appendices A, B and C. This volume presents the results of the system analysis for the Laguna Verde Unit 1 Nuclear Power Plant. The system analysis involved the development of logical models for all the systems included in the accident sequence event tree headings, and for all the support systems required to operate the front line systems. For the Internal Event analysis for Laguna Verde, 16 front line systems and 5 support systems were included. Detailed fault trees were developed for most of the important systems. Simplified fault trees focusing on major faults were constructed for those systems that can be adequately represent,ed using this kind of modeling. For those systems where fault tree models were not constructed, actual data were used to represent the dominant failures of the systems. The main failures included in the fault trees are hardware failures, test and maintenance unavailabilities, common cause failures, and human errors. The SETS and TEMAC codes were used to perform the qualitative and quantitative fault tree analyses. (Author)

  6. Design optimization of the Laguna Verde nuclear power station fuel recharge; Optimacion del diseno de recargas de combustible para la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Cortes Campos, Carlos Cristobal [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Montes Tadeo, Jose Luis [Instituto Nacional de Investigaciones Nucleares (ININ), Salazar (Mexico)

    1991-12-31

    It is described, in general terms, the procedure that is followed to accomplish the optimization of the recharge design, and an example is shown where this procedure was applied for the analysis of the type BWR reactor of Unit No. 1 of the Laguna Verde Nuclear Power Station. [Espanol] Se describe en terminos generales el procedimiento que se sigue para realizar la optimacion del diseno de recargas, y se muestra un ejemplo en el que se utilizo dicho procedimiento para el analisis del reactor tipo BWR de la unidad 1, de la Central Laguna Verde (CLV).

  7. Design optimization of the Laguna Verde nuclear power station fuel recharge; Optimacion del diseno de recargas de combustible para la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Cortes Campos, Carlos Cristobal [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Montes Tadeo, Jose Luis [Instituto Nacional de Investigaciones Nucleares (ININ), Salazar (Mexico)

    1992-12-31

    It is described, in general terms, the procedure that is followed to accomplish the optimization of the recharge design, and an example is shown where this procedure was applied for the analysis of the type BWR reactor of Unit No. 1 of the Laguna Verde Nuclear Power Station. [Espanol] Se describe en terminos generales el procedimiento que se sigue para realizar la optimacion del diseno de recargas, y se muestra un ejemplo en el que se utilizo dicho procedimiento para el analisis del reactor tipo BWR de la unidad 1, de la Central Laguna Verde (CLV).

  8. Radioactive waste isolation in salt: peer review of the Office of Nuclear Waste Isolation's report on the Organic Geochemistry of Deep Groundwaters from the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Fenster, D.F.; Brookins, D.G.; Harrison, W.; Seitz, M.G.; Lerman, A.; Stamoudis, V.C.

    1984-08-01

    This report summarizes Argonne's review of the Office of Nuclear Waste Isolation's (ONWI's) final report entitled The Organic Geochemistry of Deep Ground Waters from the Palo Duro Basin, Texas, dated September 1983. Recommendations are made for improving the ONWI report. The main recommendation is to make the text consistent with the title and with the objective of the project as stated in the introduction. Three alternatives are suggested to accomplish this

  9. Start up and commercial operation of Laguna Verde nuclear power plant. Unit 1

    International Nuclear Information System (INIS)

    Torres Ramirez, J.F.

    1991-01-01

    Prior to start up of Laguna Verde nuclear power plant preoperational tests and start tests were performed and they are described in its more eminent aspects. In relation to commercial operation of nuclear station a series of indicator were set to which allow the measurement of performance in unit 1, in areas of plant efficiency and personal safety. Antecedents. Laguna Verde station is located in Alto Lucero municipality in Veracruz state, 70 kilometers north-northeast from port of Veracruz and a 290 kilometers east-northeast from Mexico city. The station consist of two units manufactured by General Electric, with a nuclear system of vapor supply also called boiling water (BWR/5), and with a system turbine-generator manufactured by Mitsubishi. Each unit has a nominal power of 1931 MWt and a level design power of 675 Mwe and a net power of 654 Electric Megawatts

  10. Modernization of electric power systems of the Laguna Verde Nuclear Power Plant; Modernizacion de los sistemas electricos de potencia de la Central Nuclear de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Gabaldon, M. A.; Gonzalez, J. J.; Prieto, I.

    2011-07-01

    The Power Increase Project of Laguna Verde Nuclear Plant has entailed the replacement, in one unique outage, of the main power electrical systems of the Plant (Isolated Phase Bars, Generator Circuit Breaker and Main Transformer) as well as the replacement of the Turbo-group. The simultaneous substitution of these entire system has never been done by any other Plant in the world, representing an engineering challenge that embraced the design of the new equipment up to the planning, coordination and management of the construction and commissioning works, which were successfully carried out by Iberdrola within the established outage period /47 days) for both units. (Author)

  11. Analysis of internal events for the Unit 1 of the Laguna Verde Nuclear Power Station. Appendixes

    International Nuclear Information System (INIS)

    Huerta B, A.; Lopez M, R.

    1995-01-01

    This volume contains the appendices for the accident sequences analysis for those internally initiated events for Laguna Verde Unit 1, Nuclear Power Plant. The appendix A presents the comments raised by the Sandia National Laboratories technical staff as a result of the review of the Internal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant. This review was performed during a joint Sandia/CNSNS multi-day meeting by the end 1992. Also included is a brief evaluation on the applicability of these comments to the present study. The appendix B presents the fault tree models printed for each of the systems included and.analyzed in the Internal Event Analysis for LVNPP. The appendice C presents the outputs of the TEMAC code, used for the cuantification of the dominant accident sequences as well as for the final core damage evaluation. (Author)

  12. Analysis of internal events for the Unit 1 of the Laguna Verde Nuclear Power Station. Appendixes

    International Nuclear Information System (INIS)

    Huerta B, A.; Lopez M, R.

    1995-01-01

    This volume contains the appendices for the accident sequences analysis for those internally initiated events for Laguna Verde Unit 1, Nuclear Power Plant. The appendix A presents the comments raised by the Sandia National Laboratories technical staff as a result of the review of the Internal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant. This review was performed during a joint Sandia/CNSNS multi-day meeting by the end 1992. Also included is a brief evaluation on the applicability of these comments to the present study. The appendix B presents the fault tree models printed for each of the systems included and analyzed in the Internal Event Analysis for LVNPP. The appendice C presents the outputs of the TEMAC code, used for the cuantification of the dominant accident sequences as well as for the final core damage evaluation. (Author)

  13. Current situation of spent fuel management in the Laguna Verde Nuclear Power Plant, Veracruz, Mexico

    International Nuclear Information System (INIS)

    Moreno, C.V.

    1994-01-01

    The Comision Federal de Electricidad (CFE), owner and operator of the Laguna Verde nuclear power plant (2 x 654 MWe BWR), has twice decided to increase the storage capacity of the spent fuel pools of the reactors. The Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS), the national nuclear regulatory authority, approved the increase by a factor of 2.66 in the storage capacity proposal by CFE in 1989. Each reactor spent fuel pool can now hold 614 t HM. The reracking was done at a cost of about US $13 per kg U, which will add only 0.042 mills per kWh to the fuel cycle cost. (author)

  14. Proposal for implementation of alternative source term in the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Bazan L, A.; Lopez L, M.; Vargas A, A.; Cardenas J, J. B.

    2009-10-01

    In 2010 the nuclear power plant of Laguna Verde will implement the extended power upbeat in both units of the plant. Agree with methodology of NEDC-33004P-A, (constant pressure power up rate), and the source term of core, for accidents evaluations, were increased in proportion to the ratio of power level. This means that for the case of a design basis accident of loss of coolant an increase of power of 15% originated an increase of 15% in dose to main control room. Using the method of NEDC-33004P-A to extended power upbeat conditions was determined that the dose value to main control room is very near to regulatory limit established by SRP 6.4. By the above and in order to recover the margin, the nuclear power plant of Laguna Verde will calculate an alternative source term following the criteria established in RG 1.183 (alternative radiological source term for evaluating DBA at nuclear power reactor). This approach also have a more realistic dose value using the criterion of 10-CFR-50.67, in addition is predicted to get the benefit of additional operational flexibilities. This paper present the proposal of implementing the alternative source term in Laguna Verde. (Author)

  15. Advanced Placement Program at Palo Verde College.

    Science.gov (United States)

    Twitchell, Theodore G.

    This study reports the outcome of an initial implementation of a California law permitting mentally gifted high school students to attend a junior college part time. The program procedure is described in terms of (1) selection and enrollment, (2) discipline, (3) books, (4) matters relating to high school graduation, (5) information for parents,…

  16. Technical Specifications: Palo Verde Nuclear Generating Station, Unit No. 2 (Docket No. 50-529). Appendix A

    International Nuclear Information System (INIS)

    1985-12-01

    This report includes definitions, safety limits and limiting safety system settings, bases, limiting conditions for operation and surveillance requirements, design features, and administrative controls

  17. Quality assurance evolution at Laguna Verde Nuclear Power Plant Unit 1 and 2, regulatory aspects

    International Nuclear Information System (INIS)

    Leon Martinez, Cenobia

    1996-01-01

    Quality Assurance (QA) in Mexico started with the construction of the Laguna Verde Nuclear Power Plant. The Nuclear Regulatory Body, based in the adopted regulation, required the use of Quality Assurance in the design, construction and operation of the Plant. This paper describes the evolution of QA from its beginnings, through its developing phase up to this time, and shows the role of the Regulatory Body, which has participated actively in the implantation of QA in a properly manner, enforcing the utility in avoiding deviations and non-compliancies with the established regulation. (author)

  18. Participation of the research institutes in the safety aspects of the Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Sanchez G, J.

    1991-01-01

    The main activities undertaken by two research institutes of Mexico, the Instituto de Investigaciones Electricas and the Instituto Nacional de Investigaciones Nucleares, related to the safety of the Laguna Verde Nuclear Power Plant, are described. Among these activities, the development of a system for data acquisition and analysis during pre-operational tests, the design and construction of a full-scope simulator, the in-core fuel management and the establishment of an equipment qualification laboratory, stand out. It is considered that there exists a large potential for further participation. (author)

  19. Radioactive waste isolation in salt: peer review of the Office of Nuclear Waste Isolation's reports on preferred repository sites within the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Fenster, D.; Edgar, D.; Gonzales, S.; Domenico, P.; Harrison, W.; Engelder, T.; Tisue, M.

    1984-04-01

    Documents are being submitted to the Salt Repository Project Office (SRPO) of the US Department of Energy (DOE) by Battelle Memorial Institute's Office of Nuclear Waste Isolation (ONWI) to satisfy milestones of the Salt Repository Project of the Civilian Radioactive Waste Management Program. Some of these documents are being reviewed by multidisciplinary groups of peers to ensure DOE of their adequacy and credibility. Adequacy of documents refers to their ability to meet the standards of the US Nuclear Regulatory Commission, as enunciated in 10 CFR 60, and the requirements of the National Environmental Policy Act and the Nuclear Waste Policy Act of 1982. Credibility of documents refers to the validity of the assumptions, methods, and conclusions, as well as to the completeness of coverage. This report summarizes Argonne's review of ONWI's two-volume draft report entitled Identification of Preferred Sites within the Palo Duro Basin: Vol. 1 - Palo Duro Location A, and Vol. 2 - Palo Duro Location B, dated January 1984. Argonne was requested by DOE to review these documents on January 17 and 24, 1984 (see App. A). The review procedure involved obtaining written comments on the reports from three members of Argonne's core peer review staff and three extramural experts in related research areas. The peer review panel met at Argonne on February 6, 1984, and reviewer comments were integrated into this report by the review session chairman, with the assistance of Argonne's core peer review staff. All of the peer review panelists concurred in the way in which their comments were represented in this report (see App. B). A letter report and a draft of this report were sent to SRPO on February 10, 1984, and April 17, 1984, respectively. 5 references

  20. The continuous improvement system of nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Rivera C, A.

    2009-10-01

    This paper describes the continuous improvement system of nuclear power plant of Laguna Verde and the achievements in implementing the same and additionally two study cases are presents. In February 2009 is noteworthy because the World Association of Nuclear Operators we identified as a learning organization, qualification which shows that the continuous improvement system has matured, and this system will expose as I get to learn to capitalize on our own experiences and external experiences diffused by the nuclear industry. In 2007 the management of nuclear power plants integrates its improvement systems and calls it continuous improvement system and is presented in the same extensive report that won the National Quality Award. This system is made up of 5 subsystems operating individually and are also related 1) human performance; 2) referential comparison or benchmarking; 3) self-assessment; 4) corrective action and 5) external operating experience. Five subsystems that plan, generate, capture, manage, communicate and protect the knowledge generated during the processes execution of nuclear power plant of Laguna Verde, as well as from external sources. The target set in 2007 was to increase the intellectual capital to always give response to meeting the security requirements, but creating a higher value to quality, customer, environment protection and society. In brief each of them, highlighting the objective, expectations management, implementation and some benefits. At the end they will describe two study cases selected to illustrate these cases as the organization learns by their continuous improvement system. (Author)

  1. A radiation monitoring system model for the Laguna Verde nuclear power training simulator

    International Nuclear Information System (INIS)

    Ocampo, M.H.; DeAlbornoz, B.A.

    1988-01-01

    A model for the Radiation Monitoring System of the Laguna Verde Boiling Water Reactor training simulator is presented. This model comprises enough definitions to assure interactions with the processes related, directly or indirectly, with the transport of radioisotopes. It is capable of following a dynamic behavior of the plant so an operator could be trained to become aware of nuclear radiation hazards. The model is composed of three parts: the electronics for the Process and Area Radiation Monitoring System; a lumped parameter transport model for the most representative radioisotopes; and the interactions with the modeled processes as well as with process not being simulated. The first part represents the radiation monitor controls in the vertical board panels of the nuclear station. The second part allows the carrying of nuclear isotopes between processes. The third part defines the way that the process interacts with the electronics at the point of release to environment or the point of detection. Each part of the model has been tested individually, and the transport model has been incorporated as a part of each process required to simulate nuclear radiation. The model parameters has been calculated using typical BWR nuclear radiation data, and Laguna Verde heat balance data at 100% design power. However, tunning will be necessary once the Simulator is integrated and tested. The tunning allows each detecting channel to behave as expected

  2. Electrical Systems at Laguna Verde Nuclear Power Plant (LVNPP) after the Fukushima accident

    International Nuclear Information System (INIS)

    Lopez Jimenez, Jose Francisco

    2015-01-01

    During the accident occurred in Fukushima Daiichi Nuclear Power Station in Japan, the onsite and offsite electrical systems were affected and lost for a long time with irreversible consequences, therefore, the Mexican Regulatory Body known as the National Commission for Nuclear Safety and Safeguards (CNSNS: for its acronym in Spanish) has taken several actions to review the current capacity of the electrical systems installed at Laguna Verde NPP to cope with an event beyond of the design basis. The first action was to require to Laguna Verde NPP the compliance with Information Notice 2011-05 'Tohoku-Taiheiyou-Oki earthquake effects on Japanese Nuclear Power Plants' and with 10 CFR 50.54 'Conditions of licenses' section 'hh', both documents were issued by the United States Nuclear Regulatory Commission (USNRC). Additionally, CNSNS has taken into account the response actions emitted by other countries after the Fukushima accident. This involved the review of documents generated by Germany, Canada, United Arab Emirates, Finland, France, the United Kingdom and the Western European Nuclear Regulator's Association (WENRA). CNSNS made special inspections to verify the current capacity of the electrical systems of AC and DC. As a result of these inspections, CNSNS issued requirements that must be addressed by Laguna Verde NPP to demonstrate that it has the capacity to cope with events beyond the design basis. Parallel to the above, Mexico has participated in the Ibero-american Forum to address matters related to the 'Resistance Tests', the evaluations of the Forum have reached similar conclusions to those required by European Nuclear Safety Regulators Group (ENSREG), under the format proposed by WENRA. The actions carried out here are closely linked to the requirements established by the USNRC. It is also important to mention that: 1) the Extended Power Up-rate project was implemented in both Units of the Laguna Verde NPP before

  3. Internal event analysis for Laguna Verde Unit 1 Nuclear Power Plant. Accident sequence quantification and results

    International Nuclear Information System (INIS)

    Huerta B, A.; Aguilar T, O.; Nunez C, A.; Lopez M, R.

    1994-01-01

    The Level 1 results of Laguna Verde Nuclear Power Plant PRA are presented in the I nternal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant, CNSNS-TR 004, in five volumes. The reports are organized as follows: CNSNS-TR 004 Volume 1: Introduction and Methodology. CNSNS-TR4 Volume 2: Initiating Event and Accident Sequences. CNSNS-TR 004 Volume 3: System Analysis. CNSNS-TR 004 Volume 4: Accident Sequence Quantification and Results. CNSNS-TR 005 Volume 5: Appendices A, B and C. This volume presents the development of the dependent failure analysis, the treatment of the support system dependencies, the identification of the shared-components dependencies, and the treatment of the common cause failure. It is also presented the identification of the main human actions considered along with the possible recovery actions included. The development of the data base and the assumptions and limitations in the data base are also described in this volume. The accident sequences quantification process and the resolution of the core vulnerable sequences are presented. In this volume, the source and treatment of uncertainties associated with failure rates, component unavailabilities, initiating event frequencies, and human error probabilities are also presented. Finally, the main results and conclusions for the Internal Event Analysis for Laguna Verde Nuclear Power Plant are presented. The total core damage frequency calculated is 9.03x 10-5 per year for internal events. The most dominant accident sequences found are the transients involving the loss of offsite power, the station blackout accidents, and the anticipated transients without SCRAM (ATWS). (Author)

  4. Actinides inventory of the nuclear power plant of Laguna Verde Unit 1; Inventario de actinidos de la Central Nuclear Laguna Verde Unidad 1

    Energy Technology Data Exchange (ETDEWEB)

    Martinez C, E.; Ramirez S, J. R. [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico); Alonso V, G., E-mail: eduardo.martinez@inin.gob.mx [IPN, Escuela Superior de Fisica y Matematicas, Av. Instituto Politecnico Nacional s/n, U. P. Adolfo Lopez Mateos, Col. San Pedro Zacatenco, 07738 Mexico D. F. (Mexico)

    2013-10-15

    At the present time 435 nuclear power reactors exist for the electricity generation operating in the world and 63 in construction. Mexico has two reactors type BWR in the nuclear power plant of Laguna Verde. The nuclear fuel that is used in the nuclear reactors is retired of the reactor core when the energy that this contained has been extracted. This used fuel is known as spent nuclear fuel, the problem with this fuel is that was irradiated inside the reactor and continuous emitting a high radiation, as well as a significant heat quantity when being extracted, for what is necessary to maintain it in cooling and with some shielding to be protected of the radiation that emits. This objective is achieved confining the fuel in the spent nuclear fuel pool, where it is cooled and the same pool provides the necessary shielding to maintain the surroundings in safety radiation levels for the personnel that work in the power plant. An inconvenience of the pools is its limited storage capacity and that after certain time is necessary to remove the fuel, according to the established regulation to continue operating. To correct this inconvenience, two alternatives of spent fuel disposition exist, 1) the final disposition in deep geologic repositories and 2) the reprocessing and recycled of spent fuel. Each alternative presents its particularities and specific problems; however taking many years to be able to implement anyone of them. To carry out the second option, is indispensable to estimate the total mass of actinides generated in the spent nuclear fuel, that which represents to develop a methodology for it, this action is the main purpose of the present work. Inside our calculation method was necessary to appeal to diverse computation tools as the codes Origin-S and Keno V.a. Later on the obtained were compared with a problem type Benchmark, being obtained a smaller absolute error to 1.0%. (Author)

  5. Modernization of electric power systems of the Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Gabaldon, M. A.; Gonzalez, J. J.; Prieto, I.

    2011-01-01

    The Power Increase Project of Laguna Verde Nuclear Plant has entailed the replacement, in one unique outage, of the main power electrical systems of the Plant (Isolated Phase Bars, Generator Circuit Breaker and Main Transformer) as well as the replacement of the Turbo-group. The simultaneous substitution of these entire system has never been done by any other Plant in the world, representing an engineering challenge that embraced the design of the new equipment up to the planning, coordination and management of the construction and commissioning works, which were successfully carried out by Iberdrola within the established outage period /47 days) for both units. (Author)

  6. The continuous improvement system of nuclear power plant of Laguna Verde; El sistema de mejora continua de la central nucleoelectrica Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Rivera C, A. [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Km. 42.5 Cardel-Nautla, Veracruz (Mexico)], e-mail: arr99999@cfe.gob.mx

    2009-10-15

    This paper describes the continuous improvement system of nuclear power plant of Laguna Verde and the achievements in implementing the same and additionally two study cases are presents. In February 2009 is noteworthy because the World Association of Nuclear Operators we identified as a learning organization, qualification which shows that the continuous improvement system has matured, and this system will expose as I get to learn to capitalize on our own experiences and external experiences diffused by the nuclear industry. In 2007 the management of nuclear power plants integrates its improvement systems and calls it continuous improvement system and is presented in the same extensive report that won the National Quality Award. This system is made up of 5 subsystems operating individually and are also related 1) human performance; 2) referential comparison or benchmarking; 3) self-assessment; 4) corrective action and 5) external operating experience. Five subsystems that plan, generate, capture, manage, communicate and protect the knowledge generated during the processes execution of nuclear power plant of Laguna Verde, as well as from external sources. The target set in 2007 was to increase the intellectual capital to always give response to meeting the security requirements, but creating a higher value to quality, customer, environment protection and society. In brief each of them, highlighting the objective, expectations management, implementation and some benefits. At the end they will describe two study cases selected to illustrate these cases as the organization learns by their continuous improvement system. (Author)

  7. Stress corrosion evaluation on stainless steel 304 pipes in Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Arganis J, C.R.

    1996-01-01

    Inside the frame of the project IAEA/MEX-41044 'Stress corrosion as a starting event of accidents in nuclear plants', and of the institutional project IA-252 under the same name, it was required from the Laguna Verde Nuclear Plant, material equivalent to the one employed in the piping of the primary recycling system. Laguna Verde Nuclear Plant granted two tracks of tubes, that could be used to substitute the ones that are in operation, as is the tube SA-358TP304 CL-QC with transversal welding, designated as ER-316-LQA. According to the report entitles 'Revision of the operational experience related to corrosion in the nuclear plants' it was found that the stress corrosion is the principal mechanism of corrosion present in the nuclear plants. Previous records indicate that sensitized stainless steels are resistant to stress corrosion in testings of constant loading in sea water (3.5% of chlorides approximately) to 80 Centigrade and to 80% of the limit of conveyance and that a solution of 22% of NaCl to 90 Centigrade, produces cracking due to stress corrosion in highly sensitized steels, in tests of speed of slow extension (SSRT), to a speed of 1x10 -6 s -1 . Daniels reports that there is a direct relation between the speed limit of detection of the SSRT test and the concentration of chlorides, for stainless steels tested to 100 Centigrade. The minimum detection speed of susceptibility to stress corrosion for solution to 20% of NaCl, is of 1x10 -7 s -1 . Taking into account these considerations, the employment of a solution with 22% of NaCl to 90 Centigrade to a speed of 1x10 -6 s -1 seems a good choice for the evaluation of stainless steel. (Author)

  8. Calculating of radiation doses in rutinary unloads of liquid wastes from Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Molina, G.

    1985-01-01

    Utilization of nuclear energy to produce or generate electricity is a growing practice in the world, since it represent an economic and safe option to replace fossil fuels. During operation of nuclear power plants, radioactive materials are produced. A small fraction of these material are released to environment in the form of liquid or gaseous effluents. Estimation of radiation doses causing by effluents release has three purposes. During design phase of a nuclear station it is useful to adapt the wastes treatment systems to acceptable limits. During licensing phase, the regulator organism verifies the design of nuclear station effectuating estimation of doses. Finally, during operation of a nuclear station, before every unload of radioactive effluents, radiation doses should be evaluate in order to fulfill technical specifications, which limit the release of radioactive materials to environment. 1. To perform calculations of individual doses due to liquid radioactive effluents unload in units 1 and 2 of Laguna Verde nuclear power plant (In licensing phase). 2. To perform a parametric study of the effect of unload recirculation over individual dose, since recirculation has two principal effects: thermodynamical effects in nuclear station and radioactivity concentration, the last can affect the fullfilment of dose limits. 3. To perform the calculation of collective doses causes by unloads of liquid effluents within a radius of 80 Kms. of nuclear station caused by unload of liquid radioactive effluents during normal operation of nuclear power plant and does not include doses caused during accident conditions. In Mexico the organism in charge of regulation of peaceful uses of nuclear energy is Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) and for Laguna Verde licensing, the regulations of country who manufactured the reactor was adopted, it is to say United States of America. In Appendix 'C' units used along this work are explained. Unless another

  9. Estimating of seismic return periods in Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Flores R, J.H.

    1993-01-01

    The study of seismic risk in the site of Laguna Verde Nuclear Power Plant and surroundings was made considering the different periods of seismic return and the probability of occurrence in distinct time intervals (50, 75, 100, 125, 150 years) starting with the distribution of first type of extreme values of Gumbel (G1), the value used for the assessment of lifetime of lump was 50 years, and the rest of the periods are used to evaluate temporary nuclear cemeteries, it is to say for reducing the radioactivity of burned fuel assemblies. The seismic data belongs to the seismicity catalog (1920-1982) elaborated around the site, which average magnitude was 5 in the Richter Scale and are considered as shallow and are located in the Continental crust of North American shelf, and are induced by the pressure of the cocos shelf, being 36 % of the seismic movements of intermediate value and two seismic movements of deep value. (Author)

  10. Modernization of the Electric Power Systems (transformers, rods and switches) in the Laguna Verde Nuclear Power Plant (Mexico)

    International Nuclear Information System (INIS)

    Gonzalez Solarzano, J. J.; Gabaldon Martin, M. A.; Pallisa Nunez, J.; Florez Ordeonez, A.; Fernandez Corbeira, A.; Prieto Diez, I.

    2010-01-01

    Description of the changes made in the Electric Power Systems as a part of the power increase project in the Laguna Verde Nuclear Power Plant (Mexico). The main electrical changes to make, besides the turbo group, are the main generation transformers, the isolated rods and the generation switch.

  11. The Bridges SOI Model School Program at Palo Verde School, Palo Verde, Arizona.

    Science.gov (United States)

    Stock, William A.; DiSalvo, Pamela M.

    The Bridges SOI Model School Program is an educational service based upon the SOI (Structure of Intellect) Model School curriculum. For the middle seven months of the academic year, all students in the program complete brief daily exercises that develop specific cognitive skills delineated in the SOI model. Additionally, intensive individual…

  12. Simulation of the electric systems of the Laguna Verde nuclear power station; Simulacion de los sistemas electricos de la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez Lozano, Saul; Ruiz Ponce, Gerardo E [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1992-03-01

    In this article, the electric system models of the Laguna Verde Nuclear Power Station (CNLV) simulator, are presented. These models permit the functioning simulation, in the different operation modes of the main generator (Ruiz and Rodriguez 1991a), of the auxiliaries system and of the substation (Ruiz and Rodriguez 1991b), and of the emergency diesel generators system (Ruiz and Rodriguez 1991c). The general characteristics of such systems, considered as the basis to obtain the representative models, which were developed as modules in an independent way to be integrated in the simulator, are also described. [Espanol] En este articulo, se presenta los modelos de los sistemas electricos del simulador de la Central Laguna Verde (CLV). Estos modelos permiten simular el funcionamiento, en los diferentes modos de operacion del generador principal (Ruiz y Rodriguez, 1991a), del sistema de auxiliares y de la subestacion (Ruiz y Rodriguez, 1991b) y del sistema de generadores diesel de emergencia (Ruiz y Rodriguez, 1991c). Asimismo, se describen las caracteristicas generales de tales sistemas, consideradas como la base para obtener los modelos representativos, los cuales fueron desarrollados como modulos en forma independiente para integrarse al simulador.

  13. Actinides inventory of the nuclear power plant of Laguna Verde Unit 1

    International Nuclear Information System (INIS)

    Martinez C, E.; Ramirez S, J. R.; Alonso V, G.

    2013-10-01

    At the present time 435 nuclear power reactors exist for the electricity generation operating in the world and 63 in construction. Mexico has two reactors type BWR in the nuclear power plant of Laguna Verde. The nuclear fuel that is used in the nuclear reactors is retired of the reactor core when the energy that this contained has been extracted. This used fuel is known as spent nuclear fuel, the problem with this fuel is that was irradiated inside the reactor and continuous emitting a high radiation, as well as a significant heat quantity when being extracted, for what is necessary to maintain it in cooling and with some shielding to be protected of the radiation that emits. This objective is achieved confining the fuel in the spent nuclear fuel pool, where it is cooled and the same pool provides the necessary shielding to maintain the surroundings in safety radiation levels for the personnel that work in the power plant. An inconvenience of the pools is its limited storage capacity and that after certain time is necessary to remove the fuel, according to the established regulation to continue operating. To correct this inconvenience, two alternatives of spent fuel disposition exist, 1) the final disposition in deep geologic repositories and 2) the reprocessing and recycled of spent fuel. Each alternative presents its particularities and specific problems; however taking many years to be able to implement anyone of them. To carry out the second option, is indispensable to estimate the total mass of actinides generated in the spent nuclear fuel, that which represents to develop a methodology for it, this action is the main purpose of the present work. Inside our calculation method was necessary to appeal to diverse computation tools as the codes Origin-S and Keno V.a. Later on the obtained were compared with a problem type Benchmark, being obtained a smaller absolute error to 1.0%. (Author)

  14. Negative sequence relay applied to generator 1 of the Laguna Verde nuclear power plant; Aplicacion de un relevador de secuencia negativa en el generador 1 de la central de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Diaz de la Serna P, Enrique [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1988-12-31

    The rotor of a synchronous generator can be dangerously heated in a short time by stator current unbalance, therefore it must be protected with a specific relay. This article discusses the protection and the adjustments selected for Unit 1 of the Comision Federal de Electricidad Laguna Verde Nuclear Nuclear Power Station. [Espanol] El rotor de un generador sincrono puede calentarse peligrosamente en un tiempo corto debido a desbalance de corrientes en el estator, por lo que debe protegerse con un relevador especifico. En este articulo se describen la proteccion y los ajustes seleccionados para la unidad 1, de la central nucleoelectrica Laguna Verde de la Comision Federal de Electricidad.

  15. Analysis of internal events for the Unit 1 of the Laguna Verde nuclear power station

    International Nuclear Information System (INIS)

    Huerta B, A.; Aguilar T, O.; Nunez C, A.; Lopez M, R.

    1993-01-01

    This volume presents the results of the starter event analysis and the event tree analysis for the Unit 1 of the Laguna Verde nuclear power station. The starter event analysis includes the identification of all those internal events which cause a disturbance to the normal operation of the power station and require mitigation. Those called external events stay beyond the reach of this study. For the analysis of the Laguna Verde power station eight transient categories were identified, three categories of loss of coolant accidents (LOCA) inside the container, a LOCA out of the primary container, as well as the vessel break. The event trees analysis involves the development of the possible accident sequences for each category of starter events. Events trees by systems for the different types of LOCA and for all the transients were constructed. It was constructed the event tree for the total loss of alternating current, which represents an extension of the event tree for the loss of external power transient. Also the event tree by systems for the anticipated transients without scram was developed (ATWS). The events trees for the accident sequences includes the sequences evaluation with vulnerable nucleus, that is to say those sequences in which it is had an adequate cooling of nucleus but the remoting systems of residual heat had failed. In order to model adequately the previous, headings were added to the event tree for developing the sequences until the point where be solved the nucleus state. This process includes: the determination of the failure pressure of the primary container, the evaluation of the environment generated in the reactor building as result of the container failure or cracked of itself, the determination of the localization of the components in the reactor building and the construction of boolean expressions to estimate the failure of the subordinated components to an severe environment. (Author)

  16. Implementation of the project of equipment reliability in the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Rios O, J. E.; Martinez L, A. G.

    2008-01-01

    A equipment is reliable if it fulfills the function for which was designed and when it is required. To implement a project of reliability in a nuclear power plant this associate to a process of continuous analysis of the operation, of the conditions and faults of the equipment. The analysis of the operation of a system, of the equipment of the same faults and the parts that integrate to equipment take to identify the potential causes of faults. The predictive analysis on components and equipment allow to rectify and to establish guides to optimize the maintenance and to guarantee the reliability and function of the same ones. The reliability in the equipment is without place to doubts a wide project that embraces from the more small component of the equipment going by the proof of the parts of reserve, the operation conditions until the operative techniques of analysis. Without place of doubt for a nuclear power plant the taking of decisions based on the reliability of their systems and equipment will be the appropriate for to assure the operation and reliability of the same one. In this work would appear the project of reliability its processes, criteria, indicators action of improvement and the interaction of the different disciplines from the Nuclear Power Plant of Laguna Verde like a fundamental point for it put in operation. (Author)

  17. 30 years in the Veracruz state coast landscape: Laguna Verde nuclear power station. 1. ed.; 30 anos de paisaje costero veracruzano: Central Nucleoelectrica Laguan Verde

    Energy Technology Data Exchange (ETDEWEB)

    Guevara, S; Moreno Casasola, P; Castillo Campos, G; Dorantes, C; Gonzalez Garcia, F; Halffter, G; Isunza, E; Lot H, A; Mendoza, R; Paradowska, K; Priego, A; Sanchez Vigil, C; Vazquez, G [Comision Federal de Electricidad and Instituto Nacional de Ecologia A.C. (Mexico)

    2008-07-01

    36 years ago one of the most important power projects of Mexico was born; the design and construction of the Nuclear power station Laguna Verde. This project became reality thanks to the commitment of a group of Mexican professionals that gave the best of them for its accomplishment. At that time, there was not in Mexico a legislation that contemplated the environmental protection; nevertheless, the Mexican Constitution anticipates that when in the country there is not legislation for the development of a project, this must adopt the legislation of the country that is selling it. In the specific case of Laguna Verde, the legislation of the United States of America was adopted and in the environmental part it had to issue the first Manifest of Environmental impact, that was called Informe Ambiental para la Contruccion de Laguna Verde en el Estado de Veracruz. This study was performed by several national as well as foreign institutions. Among the most outstanding are the Universidad Nacional Autonoma de Mexico, the Intituto Politecnico Nacional, the Universidad Veracruzana, the Intituto National para la Investigacion de Recursos Biologicos, the Instituto de Ecologia, A.C. With this report, the engineers undertook the task of designing and constructing, the biologists and ecologists to realize the studies to mitigate the effects caused to the environment during the construction and later, during the operation of the Nuclear power station. After 18 years of commercial operation of the power station the present book is completed, in which the results obtained in 1972, when the studies of the environmental report began are compared against the ones obtained throughout this period. It is important to see in the results of the different studies and indicators presented/displayed in this book, that the important changes on the environment are due, to the change of the ground use and the over-exploitation of the natural resources as it happens in almost all the country. The

  18. Electrical systems at the nuclear power plant of Laguna Verde after the event in Fukushima

    International Nuclear Information System (INIS)

    Lopez J, J. F.

    2016-09-01

    During the event at the nuclear power plant of Fukushima Daichii (Japan), the electrical systems were affected both Onsite and Offsite, which were lost for a long time with irreversible consequences. Therefore, the Mexican Regulatory Body known as the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) has taken various actions to review the current capacity of the electrical systems at the nuclear power plant of Laguna Verde (NPP-LV) before an event beyond the design bases. The CNSNS made special inspections to the NPP-LV to verify the current capacity of the electrical systems of Ac and Dc; as a result of the inspections, requirements were generated that must be met to demonstrate that has the capacity to deal with events beyond the design bases. In addition, CNSNS has participated in the Ibero-American Forum to deal with resistance testing. Is important to note that prior to the event at the nuclear power plant of Fukushima, the NPP-LV had implemented 1) the project Extended Power Increase in both Units of the NPP-LV, and 2) the Generic Charter 2006-02, both issues are considered contributions in the robustness of electrical systems. But it is also important to mention that the US Nuclear Regulatory Commission will soon issue mitigation strategies for a Station Blackout event, which could involve new actions at nuclear power plants. Based on the aforementioned, the CNSNS concludes that all the actions being taken contribute to the strengthening of the NPP-LV electrical systems, in order to increase their reliability, safety and operation when these are required to deal with events beyond the design bases as the event occurred in Fukushima Daichii and avoid as far as possible, damage in the reactor cores of the NPP-LV. (Author)

  19. Results of Cable Aging Management Tests for Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Garcia Hernandez, E.E.; Vazquez Cervantes, R.M.; Bonifacio M, J.; Garcia Garcia, J.

    2012-01-01

    Laguna Verde Nuclear Power Plant (LVNPP) located in Veracruz, Mexico is a BWR plant, two Units with 810 MWe each one, Unit 1 (1989) and Unit 2 (1990). The Equipment Qualification (EQ) Group at the Nuclear Research National Institute (ININ) has been working with the plant on tasks to develop the LVNPP cables Aging Management Program (AMP), as part of the technical basis to extend the operational life of the plant through license renewal up to 60 years. LVNPP cables are qualified for 40 years plus a LOCA DBA in accordance with 10.CFR 50.49 and the IEEE Std-323 and IEEE St. 383. The first studies for cables AMP have been performed with samples of safety related I and C cables taken from the LVNPP warehouse, similar brands and models as installed at the plant. ININ applied the condition monitoring techniques to these samples to identify predictive degradation and to establish the methodology for cables AMP, focused to the LVNPP license renewal. Cable tests program has been running at the EQ Lab in ININ, performing accelerated aging by steps up to 60 years and to 40 years plus a LOCA test. Determination for Activation Energy (Ea) and Oxidation Induction Time (OIT) methods were developed applying a DSC/TGA calorimeter. (author)

  20. Questions to the reactors power upgrade of the Nuclear Power Plant of Laguna Verde

    International Nuclear Information System (INIS)

    Salas M, B.

    2014-08-01

    The two reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) were subjected to power upgrade labors with the purpose of achieving 20% upgrade on the original power; these labors concluded in August 24, 2010 for the Reactor 1 and in January 16, 2011 for the Reactor 2, however in January of 2014, the NNP-L V has not received by part of the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) the new Operation License to be able to work with the new power, because it does not fulfill all the necessary requirements of safety. In this work is presented and analyzed the information obtained in this respect, with data provided by the Instituto Federal de Acceso a la Informacion Publica y Proteccion de Datos (IFAI) and the Comision Federal de Electricidad (CFE) in Mexico, as well as the opinion of some workers of the NPP-L V. The Governing Board of the CFE announcement that will give special continuation to the behavior on the operation and reliability of the NPP-L V, because the frequency of not announced interruptions was increased 7 times more in the last three years. (Author)

  1. Implementation of the project of equipment reliability in the nuclear power plant of Laguna Verde; Implementacion del proyecto de confiabilidad de equipo en la Central Nucleoelectrica Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Rios O, J. E.; Martinez L, A. G. [CFE, Central Laguna Verde, Subgerencia General de Operacion, Veracruz (Mexico)]. e-mail: jrios@cfe.gob.mx

    2008-07-01

    A equipment is reliable if it fulfills the function for which was designed and when it is required. To implement a project of reliability in a nuclear power plant this associate to a process of continuous analysis of the operation, of the conditions and faults of the equipment. The analysis of the operation of a system, of the equipment of the same faults and the parts that integrate to equipment take to identify the potential causes of faults. The predictive analysis on components and equipment allow to rectify and to establish guides to optimize the maintenance and to guarantee the reliability and function of the same ones. The reliability in the equipment is without place to doubts a wide project that embraces from the more small component of the equipment going by the proof of the parts of reserve, the operation conditions until the operative techniques of analysis. Without place of doubt for a nuclear power plant the taking of decisions based on the reliability of their systems and equipment will be the appropriate for to assure the operation and reliability of the same one. In this work would appear the project of reliability its processes, criteria, indicators action of improvement and the interaction of the different disciplines from the Nuclear Power Plant of Laguna Verde like a fundamental point for it put in operation. (Author)

  2. Electrical systems at the nuclear power plant of Laguna Verde after the event in Fukushima; Sistemas electricos en la central nucleoelectrica Laguna Verde despues del evento de Fukushima

    Energy Technology Data Exchange (ETDEWEB)

    Lopez J, J. F., E-mail: jflopez@cnsns.gob.mx [Comision Nacional de Seguridad Nuclear y Salvaguardias, Dr. Jose M. Barragan 779, Col. Narvarte, 03020 Ciudad de Mexico (Mexico)

    2016-09-15

    During the event at the nuclear power plant of Fukushima Daichii (Japan), the electrical systems were affected both Onsite and Offsite, which were lost for a long time with irreversible consequences. Therefore, the Mexican Regulatory Body known as the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) has taken various actions to review the current capacity of the electrical systems at the nuclear power plant of Laguna Verde (NPP-LV) before an event beyond the design bases. The CNSNS made special inspections to the NPP-LV to verify the current capacity of the electrical systems of Ac and Dc; as a result of the inspections, requirements were generated that must be met to demonstrate that has the capacity to deal with events beyond the design bases. In addition, CNSNS has participated in the Ibero-American Forum to deal with resistance testing. Is important to note that prior to the event at the nuclear power plant of Fukushima, the NPP-LV had implemented 1) the project Extended Power Increase in both Units of the NPP-LV, and 2) the Generic Charter 2006-02, both issues are considered contributions in the robustness of electrical systems. But it is also important to mention that the US Nuclear Regulatory Commission will soon issue mitigation strategies for a Station Blackout event, which could involve new actions at nuclear power plants. Based on the aforementioned, the CNSNS concludes that all the actions being taken contribute to the strengthening of the NPP-LV electrical systems, in order to increase their reliability, safety and operation when these are required to deal with events beyond the design bases as the event occurred in Fukushima Daichii and avoid as far as possible, damage in the reactor cores of the NPP-LV. (Author)

  3. Dynamic analysis of the condensate and of the feed water in the Laguna Verde nuclear power station; Analisis dinamico del sistema de condensado y agua de alimentacion de la nucleoelectrica de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Macedo Muth, Javier; Sandoval Pena, Ramon [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1988-12-31

    This article shows a non-lineal mathematical model for the condensate, and feed water systems and for feed water heater drains at the Laguna Verde Nuclear Power Station for its simulation in real time. The model allows the calculation of flows and pressures in all the piping system and equipment that integrate the systems. It was obtained by using the force unbalance in the fluid concept and is capable of reproducing its dynamic behavior through variations induced by the different operation modes and more common failures. The final model objective is to form part of the Laguna Verde simulator that will be used for operator training of this Nuclear Power Plant. [Espanol] En este articulo se muestra un modelo matematico no lineal de los sistemas de condensado, agua de alimentacion y drenes de calentadores de la central nuclear de Laguna Verde para su simulacion en tiempo real. El modelo permite calcular los flujos y las presiones en toda la red de tuberias y equipos que integran los sistemas. Se obtuvo utilizando el concepto de desbalance de fuerzas en el fluido, y es capaz de reproducir su comportamiento dinamico ante variaciones inducidas por los diversos modos de operacion y fallas mas comunes. El objetivo final del modelo es formar parte del simulador de Laguna Verde que se empleara para el adiestramiento de los operadores de dicha central nuclear.

  4. Super compacting of drums with dry solid radioactive waste in the nuclear power plant of Laguna Verde;Super compactacion de bidones con desecho radiactivo solido seco en la central nucleo electrica Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez G, R.; Lara H, M. A.; Cabrera Ll, M.; Verdalet de la Torre, O., E-mail: marco.lara@cfe.gob.m [Comision Federal de Electricidad, Central Nucleoelectrica de Laguna Verde, Carretera Nautla-Cardel Km. 42.5, Alto Lucero, Veracruz (Mexico)

    2009-10-15

    The nuclear power plant of Laguna Verde located in the Gulf of Mexico, completes in this 2009, nineteen years to produce by nuclear means 4.78% of the electric power that Mexico requires daily. During this time, the Unit 1 has generated more of 88.85 million mega watt-hour and the Unit 2 more of 69.48 million mega watt-hour with an availability average of 83.55%. Derived of their operation cycles, the nuclear power plant has generated (as any other installation of its type) radioactive wastes of low activity that at the moment are temporarily stored in the site. Due to the life cycle of the nuclear power plant, actually has become necessary to begin a project series focused to continue guaranteeing the storage of these wastes, guarantee that is a license requirement for the operation of this nuclear installation before the National Commission of Nuclear Security and Safeguards. The Federal Commission of Electricity beginning a project that allows continue guaranteeing space of sufficient storage for the wastes that the nuclear power plant of Laguna Verde could generate for the rest of its useful life, this project consisted on a process of physical volume reduction of dry solid radioactive wastes denominated super compacting, it has made possible to reduce the volume that these wastes occupy in the temporary storage noted Dry Solid Radioactive Wastes Deposit located inside the site that occupies the nuclear power plant of Laguna Verde. This work presents the super compacting results, as well as a description of the realization of this task until concluding with the super compacting of 5,854 drums with dry solid radioactive waste of low activity. We will enunciate which were the radiological controls that the Department of Radiological Protection of the nuclear power plant of Laguna Verde applied to this work that was realized for first time in Mexico and the nuclear power plant. (Author)

  5. Preliminary evaluation of the profitability indexes of the Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Villanueva M, C.

    2010-10-01

    The Laguna Verde nuclear power plant of the Federal Commission of Electricity has an installed capacity of 1,350 MW and unit 1 started commercial operation in 1990 and unit 2 in 1995. This paper is a synthesis of the results of a preliminary evaluation of the expected profitability indexes of the power plant during an economic lifetime of 40 years. The following data was used as input to the evaluation model prescribed by the Finance and Public Credit Secretary for public investment projects. Unit investment cost: 3,500 US D/k W; Fixed operation and maintenance cost: 54. 45 US D/year-k W; Variable operation and maintenance cost: 0. 38 US D/M Wh; Nuclear fuel cycle cost: 10. 28 US D/M Wh; Lifetime capacity factor: 85%; Discount rate: 12.0% per year; Sale price of electricity to the interconnected electric system: 80. 75 US D/M Wh. The output of the evaluation model is the following: Cost of electricity generated: 60. 2 1 US D/M Wh; fixed cost 49. 55 US D/M Wh; variable cost 10. 66 US D/M Wh; Internal rate of return (Irr): 18.0%; Benefit to cost quotient (B/C): 1.341. A very systematic sensitivity analysis was done, that shows that the cost is very sensitive to the capacity factor and to the investment cost, but is very insensitive to the fixed operation and maintenance cost and to the nuclear fuel cost. Finally, a comparison was made to the evaluation of the profitability indexes of a natural gas fired combined cycle power plant. (Author)

  6. Preliminary analysis of an hydrogen generator system based on nuclear energy in the Laguna Verde site

    International Nuclear Information System (INIS)

    Flores y Flores, A.; Francois L, J.L.

    2003-01-01

    The shortage of fossil fuels in the next future, as well as the growing one demand of energetics and the high cost of the production of alternating fuels, it forces us to take advantage of to the maximum the fossil fuel with the one which we count and to look for the form of producing alternating fuels at a low cost and better even if these supply sources are reliable and non pollutants. It is intended a solution to the shortage of fuel; to use the thermal energy liberated of some appropriate nuclear reactor to be able to obtain a fuel but clean and relatively cheap as it is the hydrogen. In the first place the methods were looked for to produce hydrogen using thermal energy, later it was analyzed the temperature liberated by the existent nuclear reactors as well as the advanced designs, according to this liberated temperature settled down that the methods but feasible to produce hydrogen its were the one of reformed with water stream of the natural gas (methane) and the other one of the S-I thermochemical cycle, and the nuclear reactors that give the thermal energy for this production they are those of gas of high temperature. Once established the processes and the appropriate reactors, it was analyzed the site of Laguna Verde, with relationship to the free space to be able to place the reactor and the plant producer of hydrogen, as well as the direction in which blow the dominant winds and the near towns to the place, it was carried out an analysis of some explosion of tanks that could store hydrogen and the damage that its could to cause depending from the distance to which its were of the fire. Finally it was carried out an evaluation of capital and of operation costs for those two methods of hydrogen production. (Author)

  7. Estimation of seismic return periods in the Laguna Verde nuclear plant

    International Nuclear Information System (INIS)

    Flores R, J.H.

    1992-01-01

    The study of seismic risk in the area of the Laguna Verde Nucleo electric plant (PNLV) and its surroundings, one carries out estimating the different return periods and the occurrence probability in different intervals of time (5, 75, 100, 125, 150 years starting from the distribution of first type of Gumbel (G1) of extreme values (Burton, 1986), the value that was used to evaluate the useful life of the PNLV was of 50 years, the other periods will be occupy to evaluate 'temporal' nuclear cemeteries, that is to say for diminish the radioactive activity of the fuel assemblies already burned in the reactor pool or in a near place to the place. The seismic data that were used for the analysis were of the seismic catalog that it was elaborated from (1920-1982), around the place whose seismic half magnitude was of 5 grades Richter and a depth 65 km, these earthquakes are classified as shallow earthquakes, which are located in the continental plaque of North-America, these they are induced by the efforts of push of the plaque of Cocos, existing 36% of intermediate and 2 of deep earthquakes. (Author)

  8. Analysis of the Power oscillations event in Laguna Verde Nuclear Power Plant. Preliminary Report

    International Nuclear Information System (INIS)

    Gonzalez M, V.M.; Amador G, R.; Castillo, R.; Hernandez, J.L.

    1995-01-01

    The event occurred at Unit 1 of Laguna Verde Nuclear Power Plant in January 24, 1995, is analyzed using the Ramona 3 B code. During this event, Unit 1 suffered power oscillation when operating previous to the transfer at high speed recirculating pumps. This phenomenon was timely detected by reactor operator who put the reactor in shut-down doing a manual Scram. Oscillations reached a maximum extent of 10.5% of nominal power from peak to peak with a frequency of 0.5 Hz. Preliminary evaluations show that the event did not endangered the fuel integrity. The results of simulating the reactor core with Ramona 3 B code show that this code is capable to moderate reactor oscillations. Nevertheless it will be necessary to perform a more detailed simulation of the event in order to prove that the code can predict the beginning of oscillations. It will be need an additional analysis which permit the identification of factors that influence the reactor stability in order to express recommendations and in this way avoid the recurrence of this kind of events. (Author)

  9. Geological-Geophysical integration in the Laguna Verde Nuclear Power Plant site and its surroundings

    International Nuclear Information System (INIS)

    Flores Ruiz, J.H.

    1990-01-01

    As part of comprehensive, nationwide evaluation of the Seismic risk at the Nuclear Power Plant site of the Laguna Verde (LVNP) the first of the acceleration ground motion maps, covering for a circular distance value 200 Km around, has been prepared. The maps were created the acceleration grounds motion expected over intervals 1, 25, 50, 100 and 200 years by using Gumbel's (I, III) theory of extreme value statistics of the seismic data. It's reaching operating basis earthquake (OBE) value 0.1 g. in 100 years forecasting and 200 years this value is 0.114 G is more than OBE, but minor than safety shutdown earthquake (SSE). The acceleration ground motion risk maps are compared to regional geology, seismicity (1920-1982) and gravity data. Good correlations are found between the accelerations ground motion risk and seismicity. A spatial correlation observed between gravity and structure with acceleration ground motion rise is considered a secondary the structural effect. Locations of the currently operating NPP correspond to low seismicity risk area. Based on these comparations, it is concluded that the method provides geologically reasonable results which are usable in a nationwide NPP assessment program (Author)

  10. Report on the Fourth Reactor Refueling. Laguna Verde Nuclear Central. Unit 1. April-May 1995

    International Nuclear Information System (INIS)

    Mendoza L, A.; Flores C, E.; Lopez G, C.P.F.

    1995-01-01

    The fourth refueling of the Unit 1 of Laguna Verde Nuclear Central was executed in the period of April 17 to May 31 of 1995 with the participation of a task group of 358 persons, included technicians and radiation protection officials and auxiliaries.The radiation monitoring and radiological surveillance to the workers was present length ways the refueling process and always attached to the ALARA criteria. The check points for radiation levels were set at: primary container or dry well, reloading floor, decontamination room (level 10.5), turbine building and radioactive waste building. To take advantage of the refueling process, rooms 203 and 213 of the turbine buildings were subject to inspection and maintenance work in valves, heaters and drains of heaters. Management aspects as personnel selection and training, costs, and countable are also presented in this report. Owing to the high cost of man-hour of the members of the ININ staff, its participation in the refueling process was in smaller number than years before. (Author)

  11. Economic analysis of extended cycles in the Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Hernandez N, H.; Hernandez M, J.L.; Francois L, J.L.

    2004-01-01

    The present work presents a preliminary analysis of economic type of extended cycles of operation of the Unit One in the Laguna Verde nuclear power plant. It is analysed an equilibrium cycle of 18 months firstly, with base to the Plan of Use of Energy of the Federal Commission of Electricity, being evaluated the cost of the energy until the end of the useful life of the plant. Later on an alternative recharge scenario is presented with base to an equilibrium cycle of 24 months, implemented to the beginning of the cycle 11, without considering transition cycles. It is added in both cycles the cost of the substitution energy, considering the unitary cost of the fuel of a dual thermoelectric power station of 350 M We and evaluating in each operation cycle, in both scenarios, the value of the substitution energy. The results show that a reduction of the days of recharge in the cycle of 24 months could make this option but favorable economically. The duration of the period of recharge rebounds in considerable grade in the cost of energy generation for concept of fuel. (Author)

  12. Analysis of the documents about the core envelopment of nuclear reactor at the Laguna Verde U-1 power plant

    International Nuclear Information System (INIS)

    Zamora R, L.; Medina F, A.

    1999-01-01

    The degradation of internal components at BWR type reactors is an important subject to consider in the performance availability of the power plant. The Wuergassen nuclear reactor license was confiscated due to the presence of cracking in the core envelopment. In consequence it is necessary carrying out a detailed study with the purpose to avoid these problems in the future. This report presents a review and analysis of documents and technical information referring to the core envelopment of a BWR/5/6 and the Laguna Verde Unit 1 nuclear reactor in Mexico. In this document are presented design data, documents about fabrication processes, and manufacturing of core envelopment. (Author)

  13. Temporary storage in dry of the spent nuclear fuel in the Nuclear Power Plant of Laguna Verde; Almacenamiento temporal en seco del combustible nuclear gastado en la Central Nuclear Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez M, N.; Vargas A, A., E-mail: natividad.hernandez@cfe.gob.mx [Comision Federal de Electricidad, Gerencia de Centrales Nucleoelectricas, Carretera Veracruz-Medellin Km. 7.5, 94270 Dos Bocas, Veracruz (Mexico)

    2013-10-15

    To guarantee the continuity in the operation of the two nuclear reactors of the nuclear power plant of Laguna Verde (NPP-L V) is an activity of high priority of the Comision Federal de Electricidad (CFE) in Mexico. At the present time, the CFE is working in the storage project in dry of the spent fuel with the purpose of to liberate space of the pools and to have the enlarged capacity of storage of the spent fuel that is discharged of the reactors. This work presents the storage option in dry of the spent fuel, considering that the original capacity of the spent fuel pools of the NPP-L V was of 1242 spaces each one and that in 1991, through a modification of the original design, the storage capacity was increased to 3177 spaces by pool. At present, the cells occupied by unit are of 2165 (68%) for the Unit-I and 1839 (58%) for the Unit-2, however, in 2017 and 2022 the capacity to discharge the complete core will be limited by what is required of a retirement option of spent fuel assemblies to liberate spaces. (author)

  14. Introduction of fuel GE14 in the nuclear power plant of Laguna Verde for the extended increase of power; Introduccion del combustible GE14 en la central nuclear Laguna Verde para el aumento de potencia extendido

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez M, N.; Vargas A, A. F.; Cardenas J, J. B.; Contreras C, P. [CFE, Central Nuclear Laguna Verde, Subgerencia de Ingenieria, Carretera Veracruz-Medellin Km. 7.5 (Mexico)]. e-mail: natividad.hernandez@cfe.gob.mx

    2008-07-01

    The project of extended increase of power responds to a necessity of electrical energy in the country, increasing the thermal exit of the reactors of the nuclear power plant of Laguna Verde of 2027 MWt to 2317 MWt. In order to support this transition, changes will make in the configuration of the reactor core and in the operation strategies of the cycle, also they will take initiatives to optimize the economy in fuel cycle. At present in both reactors of the nuclear plant of Laguna Verde fuel GE12 is used. The fuel GE14 presents displays with respect to the GE12, some improvements in the mechanical design and consequently in its performance generally. Between these improvements we can mention: 1. Spacers of high performance. 2. Shielding with barrier. 3. Filter for sweepings {sup d}ebris{sup a}nd 4. Fuel rods of minor partial length. The management of nuclear power plants has decided to introduce the use of fuel GE14 in Laguna Verde in the reload 14 for Unit 1 and of the reload 10 for Unit 2. The process of new introduction fuel GE14 consists of two stages, first consists on subjecting the one new design of fuel to the regulator organism in the USA: Nuclear Regulatory Commission, in Mexico the design must be analyzed and authorized by the National Commission of Nuclear Safety and Safeguards, for its approval of generic form, by means of the demonstration of the fulfillment with the amendment 22 of GESTAR II, the second stage includes the specific analyses of plant to justify the use of the new fuel design in a reload core. The nuclear plant of Laguna Verde would use some of the results of the security analyses that have been realized for the project of extended increase of power with fuel GE14, to document the specific analyses of plant with the new fuel design. The result of the analyses indicates that the reload lots are increased of 116-120 assemblies in present conditions (2027 MWt) to 140-148 assemblies in conditions of extended increase of power (2317 MWt

  15. Introduction of fuel GE14 in the nuclear power plant of Laguna Verde for the extended increase of power

    International Nuclear Information System (INIS)

    Hernandez M, N.; Vargas A, A. F.; Cardenas J, J. B.; Contreras C, P.

    2008-01-01

    The project of extended increase of power responds to a necessity of electrical energy in the country, increasing the thermal exit of the reactors of the nuclear power plant of Laguna Verde of 2027 MWt to 2317 MWt. In order to support this transition, changes will make in the configuration of the reactor core and in the operation strategies of the cycle, also they will take initiatives to optimize the economy in fuel cycle. At present in both reactors of the nuclear plant of Laguna Verde fuel GE12 is used. The fuel GE14 presents displays with respect to the GE12, some improvements in the mechanical design and consequently in its performance generally. Between these improvements we can mention: 1. Spacers of high performance. 2. Shielding with barrier. 3. Filter for sweepings d ebris a nd 4. Fuel rods of minor partial length. The management of nuclear power plants has decided to introduce the use of fuel GE14 in Laguna Verde in the reload 14 for Unit 1 and of the reload 10 for Unit 2. The process of new introduction fuel GE14 consists of two stages, first consists on subjecting the one new design of fuel to the regulator organism in the USA: Nuclear Regulatory Commission, in Mexico the design must be analyzed and authorized by the National Commission of Nuclear Safety and Safeguards, for its approval of generic form, by means of the demonstration of the fulfillment with the amendment 22 of GESTAR II, the second stage includes the specific analyses of plant to justify the use of the new fuel design in a reload core. The nuclear plant of Laguna Verde would use some of the results of the security analyses that have been realized for the project of extended increase of power with fuel GE14, to document the specific analyses of plant with the new fuel design. The result of the analyses indicates that the reload lots are increased of 116-120 assemblies in present conditions (2027 MWt) to 140-148 assemblies in conditions of extended increase of power (2317 MWt). (Author)

  16. Economic analysis of extended cycles in the Laguna Verde nuclear power plant; Analisis economico de ciclos de extendidos en la Central Nucleoelectrica Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez N, H.; Hernandez M, J.L.; Francois L, J.L. [Facultad de Ingenieria, UNAM, 04510 Mexico D.F. (Mexico)]. E-mail: hermilo@correo.unam.mx

    2004-07-01

    The present work presents a preliminary analysis of economic type of extended cycles of operation of the Unit One in the Laguna Verde nuclear power plant. It is analysed an equilibrium cycle of 18 months firstly, with base to the Plan of Use of Energy of the Federal Commission of Electricity, being evaluated the cost of the energy until the end of the useful life of the plant. Later on an alternative recharge scenario is presented with base to an equilibrium cycle of 24 months, implemented to the beginning of the cycle 11, without considering transition cycles. It is added in both cycles the cost of the substitution energy, considering the unitary cost of the fuel of a dual thermoelectric power station of 350 M We and evaluating in each operation cycle, in both scenarios, the value of the substitution energy. The results show that a reduction of the days of recharge in the cycle of 24 months could make this option but favorable economically. The duration of the period of recharge rebounds in considerable grade in the cost of energy generation for concept of fuel. (Author)

  17. Study of environmental noise in a BWR plant like the Nuclear Power Plant Laguna Verde

    International Nuclear Information System (INIS)

    Tijerina S, F.; Cruz G, M.; Amador C, C.

    2013-10-01

    In all industry type the health costs generated by the noise are high, because the noise can cause nuisance and to harm the capacity to work when causing tension and to perturb the concentration, and in more severe cases to reach to lose the sense of the hearing in the long term. The noise levels in the industry have been designated for the different types of use like residential, commercial, and industrial and silence areas. The noise can cause accidents when obstructing the communications and alarm signs. For this reason the noise should be controlled and mitigated, at a low level as reasonably is possible, taking into account that the noise is an acoustic contamination. The present study determines a bases line of the environmental noise levels in a nuclear power plant BWR-5 as Laguna Verde, (like reference) to be able to determine and to give pursuit to the possible solutions to eliminate or to limit the noise level in the different job areas. The noise levels were registered with a meter of integrative noise level (sonometer) and areas of noise exposure levels mapping the general areas in the buildings were established, being the registered maximum level of 96.94 dba in the building of the Reactor-elevation 0.65 m under the operation conditions of Extended Power Up rate (EPU) of 120% PTN. Knowing that the exposition to noises and the noise dose in the job place can influence in the health and in the safety of the workers, are extensive topics that they should be analyzed for separate as they are: to) the effects in the health of the exposure to the noise, b) how measuring the noise, c) the methods and technologies to combat and to control the noise in the industry by part of engineering area and d) the function of the industrial safety bodies as delegates of the health and safety in the task against the noise in the job. (author)

  18. Nuclear fuel management and transients analysis in Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    De Loera De Haro, M.A.; Alvarez Gasca, J.

    1991-01-01

    Nuclear fuel management transient analysis are the set of activities which determine the load and reload of nuclear fuel inside the reactor, with the aim of getting the maximum performance in fuel burn up and heat remotion, without have an effect in the station safety. Nuclear fuel management and transient analysis has its basis on high precision quantitative analysis methodologies by means of simulation of nuclear and physical phenomena occurring both in normal and abnormal operation of nuclear power plants. On account of complexity of simulations and the required precision, those are carry out using codes type 'best estimate'. For the use of this tools it is necessary a deep knowledge of simulated nuclear and physical phenomena, as well as the used mathematical models and the numerical methods used. If different, the simulation results will be notably different actual processes owing to the use of models out of validity range, or incorrect calculations in the input parameters. On account of complexity of simulations and the required precision, those are carry out using codes type 'best estimate'. For the use of this tools it is necessary a deep knowledge of simulated nuclear and physical phenomena, as well as the used mathematical models and the numerical methods used. If different, the simulation results will be notably different actual processes owing to the use of models out of validity range, or incorrect calculations in the input parameters

  19. Components production and assemble of the irradiation capsule of the Surveillance Program of Materials of the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Medrano, A.

    2009-01-01

    To predict the effects of the neutrons radiation and the thermal environment about the mechanical properties of the reactor vessel materials of the nuclear power plant of Laguna Verde, a surveillance program is implemented according to the outlines settled by Astm E185-02 -Standard practice for design of surveillance programs for light-water moderated nuclear power reactor vessels-. This program includes the installation of three irradiation capsules of similar materials to those of the reactor vessels, these samples are test tubes for mechanical practices of impact and tension. In the National Institute of Nuclear Research and due to the infrastructure as well as of the actual human resources of the Pilot Plant of Nuclear Fuel Assembles Production it was possible to realize the materials rebuilding extracted in 2005 of Unit 2 of nuclear power plant of Laguna Verde as well as the production, assemble and reassignment of the irradiation capsule made in 2006. At the present time the surveillance materials extracted in 2008 of Unit 1 of the nuclear power plant of Laguna Verde are reconstituting and the components are manufactured for the assembles of the irradiation capsule that will be reinstalled in the reactor vessel in 2010. The purpose of the present work is to describe the necessary components as well as its disposition during the assembles of the irradiation capsule for the surveillance program of the reactors vessel of the nuclear power plant of Laguna Verde. (Author)

  20. Geology and geohydrology of the Palo Duro Basin, Texas Panhandle. Report on the progress of nuclear waste isolation feasibility studies, 1979

    International Nuclear Information System (INIS)

    Gustavson, T.C.; Presley, M.W.; Handford, C.R.; Finley, R.J.; Dutton, S.P.; Baumgardner, R.W. Jr.; McGillis, K.A.; Simpkins, W.W.

    1980-01-01

    Since early 1977, the Bureau of Economic Geology has been evaluating several salt-bearing basins within the State of Texas as part of the national nuclear repository program. The Bureau, a research unit of The University of Texas at Austin and the State of Texas, is carrying out a long-term program to gather and interpret all geologic and hydrologic information necessary for description, delineation, and evaluation of salt-bearing strata in the Palo Duro and Dalhart Basins of the Texas Panhandle. The program in FY 79 has been subdivided into four broad research tasks, which are addressed by a basin analysis group, a surface studies group, a geohydrology group, and a host-rock analysis group. The basin analysis group has delineated the structural and stratigraphic framework of the basins, initiated natural resource assessment, and integrated data from 8000 ft (2400 m) of core material into salt-stratigraphy models. Salt depth and thickness have been delineated for seven salt-bearing stratigraphic units. Concurrently, the surface studies group has collected ground and remotely sensed data to describe surficial processes, including salt solution, slope retreat/erosion mechanisms, geomorphic evolution, and fracture system development. The basin geohydrology group has begun evaluating both shallow and deep fluid circulation within the basins. The newly formed host-rock analysis group has initiated study of cores from two drilling sites for analysis of salt and the various lithologies overlying and interbedded with salt units. This paper, a summary report of progress in FY 79, presents principal conclusions and reviews methods used and types of data and maps generated

  1. Analysis of internal events for the Unit 1 of the Laguna Verde Nuclear Power Station. Appendixes; Analisis de eventos internos para la Unidad 1 de la Central Nucleoelectrica de Laguna Verde. Apendices

    Energy Technology Data Exchange (ETDEWEB)

    Huerta B, A; Lopez M, R [Comision Nacional de Seguridad Nuclear y Salvaguardias, 03000 Mexico D.F. (Mexico)

    1995-07-01

    This volume contains the appendices for the accident sequences analysis for those internally initiated events for Laguna Verde Unit 1, Nuclear Power Plant. The appendix A presents the comments raised by the Sandia National Laboratories technical staff as a result of the review of the Internal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant. This review was performed during a joint Sandia/CNSNS multi-day meeting by the end 1992. Also included is a brief evaluation on the applicability of these comments to the present study. The appendix B presents the fault tree models printed for each of the systems included and.analyzed in the Internal Event Analysis for LVNPP. The appendice C presents the outputs of the TEMAC code, used for the cuantification of the dominant accident sequences as well as for the final core damage evaluation. (Author)

  2. Technical and economic proposal for the extension of the Laguna Verde Nuclear Power plant with an additional nuclear reactor

    International Nuclear Information System (INIS)

    Leal C, C.D.; Francois L, J.L.

    2006-01-01

    The increment of the human activities in the industrial environments and of generation of electric power, through it burns it of fossil fuels, has brought as consequence an increase in the atmospheric concentrations of the calls greenhouse effect gases and, these in turn, serious repercussions about the environment and the quality of the alive beings life. The recent concern for the environment has provoked that industrialized countries and not industrialized carry out international agreements to mitigate the emission from these gases to the atmosphere. Our country, like part of the international community, not is exempt of this problem for what is necessary that programs begin guided toward the preservation of the environment. As for the electric power generation, it is indispensable to diversify the sources of primary energy; first, to knock down the dependence of the hydrocarbons and, second, to reduce the emission of polluting gases to the atmosphere. In this item, the nucleo electric energy not only has proven to be safe and competitive technical and economically, able to generate big quantities of electric power with a high plant factor and a considerable cost, but rather also, it is one of the energy sources that less pollutants it emits to the atmosphere. The main object of this work is to carry out a technical and economic proposal of the extension of the Laguna Verde Nuclear power plant (CNLV) with a new nuclear reactor of type A BWR (Advanced Boiling Water Reactor), evolutionary design of the BWR technology to which belong the two reactors installed at the moment in the plant, with the purpose of increasing the installed capacity of generation of the CNLV and of the Federal Commission of Electricity (CFE) with foundation in the sustainable development and guaranteeing the protection of the environment by means of the exploitation of a clean and sure technology that counts at the moment with around 12,000 year-reactor of operational experience in more of

  3. Internal event analysis of Laguna Verde Unit 1 Nuclear Power Plant. System Analysis; Analisis de Eventos Internos para la Unidad 1 de la Central Nucleoelectrica de Laguna Verde. Analisis de sistemas

    Energy Technology Data Exchange (ETDEWEB)

    Huerta B, A; Aguilar T, O; Nunez C, A; Lopez M, R [Comision Nacional de Seguridad Nuclear y Salvaguardias, 03000 Mexico D.F. (Mexico)

    1993-07-01

    The Level 1 results of Laguna Verde Nuclear Power Plant PRA are presented in the {sup I}nternal Event Analysis of Laguna Verde Unit 1 Nuclear Power Plant{sup ,} CNSNS-TR-004, in five volumes. The reports are organized as follows: CNSNS-TR-004 Volume 1: Introduction and Methodology. CNSNS-TR-004 Volume 2: Initiating Event and Accident Sequences. CNSNS-TR-004 Volume 3: System Analysis. CNSNS-TR-004 Volume 4: Accident Sequence Quantification and Results. CNSNS-TR-004 Volume 5: Appendices A, B and C. This volume presents the results of the system analysis for the Laguna Verde Unit 1 Nuclear Power Plant. The system analysis involved the development of logical models for all the systems included in the accident sequence event tree headings, and for all the support systems required to operate the front line systems. For the Internal Event analysis for Laguna Verde, 16 front line systems and 5 support systems were included. Detailed fault trees were developed for most of the important systems. Simplified fault trees focusing on major faults were constructed for those systems that can be adequately represent,ed using this kind of modeling. For those systems where fault tree models were not constructed, actual data were used to represent the dominant failures of the systems. The main failures included in the fault trees are hardware failures, test and maintenance unavailabilities, common cause failures, and human errors. The SETS and TEMAC codes were used to perform the qualitative and quantitative fault tree analyses. (Author)

  4. Technological evaluation for the extension of the operation license to the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Arganis J, C. R.; Medina A, A. L.

    2010-01-01

    At the present time one of the tendencies in the nuclear industry is the renovation of operation licenses of the nuclear power plants, with the purpose of prolonging their operation 20 years more than the time settled down in their original license, which is of 30 years for the case of the nuclear power plant of Laguna Verde. This allows the electric power generation for a major period of time and to a relatively low price, giving this way a bigger competitiveness to the power stations of nuclear power. However, to request the license extension of the nuclear power plant requires to get ready the documentation and necessary studies for: to maintain a high level of security, to optimize the operation, maintenance and service life of the structures, systems and components, to maintain an acceptable level of performance, to maximize the recovery of the investment about the service of the nuclear power plant and to preserve the sure conditions for a major operation period at the license time. This paper describes the studies conducted by the Materials Technology Department of the Instituto Nacional de Investigaciones Nucleares (ININ) to substantiate the required documentation for obtaining the extension of operating license of the nuclear power plant. These studies are focused mainly in the reactor pressure vessels of both units, as well as in the deposit of noble metals and the influence of the sludges (crud s) in this deposit. (Author)

  5. Technical specifications, Palo Verde Nuclear Generating Station, Unit No. 1 (Docket No. 50-528). Appendix A to License No. NPF-34

    International Nuclear Information System (INIS)

    1984-12-01

    Technical specifications are presented concerning operating safety limits for reactivity control systems, power distribution, instrumentation, coolant system, emergency core cooling system, containment systems, plant systems, electrical power systems, refueling operations, radioactive effluents, and radiological environmental monitoring; design features of the reactor site, containment, reactor core, coolant system, and fuel storage; and administrative controls

  6. Technical Specifications: Palo Verde Nuclear Generating Station, Unit No. 1 (Docket No. 50-528). Appendix ''A'' to License No. NPF-41

    International Nuclear Information System (INIS)

    1985-05-01

    Information on the limiting conditions for operation is presented concerning reactivity control systems, power distribution limits, instrumentation, reactor coolant system, emergency core cooling system, containment systems, plant systems, electrical power systems, refueling operations, special test exceptions, radioactive effluents, and radiological environmental monitoring

  7. Estimation of requirements of eolic energy equivalent to the electric generation of the Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Garcia V, M.A.; Hernandez M, I.A.; Martin del Campo M, C.

    2004-01-01

    The advantages are presented that have the nuclear and eolic energy as for their low environmental impact and to the human health. An exercise is presented in the one that is supposed that the electric power generated by the Laguna Verde Nuclear Power plant (CNLV), with capacity of 1365 M W, it should be produced by eolic energy when in the years 2020 and 2025 the units 1 and 2 of the CNLV reach its useful life and be moved away. It is calculated the number of aero generators that would produce the electric power average yearly of the CNLV, that which is equal to install eolic parks with capacity of 2758 M W, without considering that it will also be invested in systems of back generation to produce electricity when the aero generators stops for lack of wind. (Author)

  8. Rehabilitation and modernization project of units 1 and 2 of Laguna Verde Nuclear Power Plant. A strengthening project to 120%. (2nd phase)

    International Nuclear Information System (INIS)

    Liebana, B.; Merino, A.; Garcia, J. L.; Gomez, M.; Martinez, I.; Ruiz, L.

    2010-01-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This article presents the work of the second phase.

  9. Feasibility analysis in the expansion proposal of the nuclear power plant Laguna Verde: application of real options, binomial model

    International Nuclear Information System (INIS)

    Hernandez I, S.; Ortiz C, E.; Chavez M, C.

    2011-11-01

    At the present time, is an unquestionable fact that the nuclear electrical energy is a topic of vital importance, no more because eliminates the dependence of the hydrocarbons and is friendly with the environment, but because is also a sure and reliable energy source, and represents a viable alternative before the claims in the growing demand of electricity in Mexico. Before this panorama, was intended several scenarios to elevate the capacity of electric generation of nuclear origin with a variable participation. One of the contemplated scenarios is represented by the expansion project of the nuclear power plant Laguna Verde through the addition of a third reactor that serves as detonator of an integral program that proposes the installation of more nuclear reactors in the country. Before this possible scenario, the Federal Commission of Electricity like responsible organism of supplying energy to the population should have tools that offer it the flexibility to be adapted to the possible changes that will be presented along the project and also gives a value to the risk to future. The methodology denominated Real Options, Binomial model was proposed as an evaluation tool that allows to quantify the value of the expansion proposal, demonstrating the feasibility of the project through a periodic visualization of their evolution, all with the objective of supplying a financial analysis that serves as base and justification before the evident apogee of the nuclear energy that will be presented in future years. (Author)

  10. Options for the ultimate storage of low and medium level radioactive wastes produced at Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Emeterio, Miguel

    1991-01-01

    The devoted time and still to be expend in prepare, execute and teach permanent and safe solutions to the problem of the evaluation of radioactive wastes reflects the political, economic and environmental importance with respect to public health and safety invested in this task, as well as, its technological challenges. In the case of Laguna Verde nuclear power plant, its low and medium level radioactive wastes are stored in the beginning in a temporal store with a capacity of 2000 m 3 sufficient to four years of normal operation; according to what it is necessary to select one of different ways of waste storage. Different technologies has been evaluated and the preliminary conclusion is that for Mexico the more feasible way to store radioactive wastes is in tumulus (Author)

  11. Evaluation of radwaste minimization program of dry and wet active waste in the Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Luna-Garza, Hector

    2001-01-01

    A growing rate of radwaste volume production combined with an increase of both, costs and associated dose involved in its treatment and disposition processes have created a serious problem to the Laguna Verde Nuclear Power Plant (BWR, two Units, 682 Mwe each) in Mexico. Due the lack of a Final Repository in the country, the solution in the short or long terms relies on the success of a continuous and aggressive minimization program mainly based on modifications and upgrades applied to these processes. Technical and administrative strategies adopted by LVNPP for the reduction of Liquid Effluents and Dry and Wet Active Waste in the next three years are described. Based on the results of the LVNPP current radwaste process systems, an estimated accumulation of 11,502 m 3 by the year 2035 will exceed the actual on-site storage capacity. If the strategies succeed, this production would fall to an expected manageable volume of 4067 m 3 . (author)

  12. New recommendations of the ICRP and the ALARA program of the Nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Padilla C, I.

    1991-01-01

    In view of the events happened in it finishes it decade, in the nuclear environment, it is necessary that any he/she practices that it involves exhibition to the radiation, real or potential, be detailed and systematically analyzed by the light of the current knowledge, capitalizing the generated experience. They think about three fundamental aspects in the campaign of radiological cultivation: 1. New methods of evaluation of equivalent dose. 2. Limit of individual dose, base of the change and control implications, and 3. Analysis philosophies and the application of the system of dose limitation. The program ALARA of the Laguna Verde Central from its installation in 1987 observes and it implements actions trending to optimize it practice of situation of potential and planned exhibition with the purpose of fulfilling the commitment settled down in the declaration of political of this program

  13. Development of an interactive model of the Laguna Verde nuclear power plant based on the RELAP/SCDAP code

    International Nuclear Information System (INIS)

    Salazar C, J.H.; Ramos P, J.C.; Salazar S, E.; Chavez M, C.

    2003-01-01

    The present work describes the development of an interactive model of the Nuclear power plant of Laguna Verde (CNLV) based on the RELAP/SCDAP nuclear code, and it incorporation to a classroom simulator. The functional prototype it allows to make evaluations for operational transients and postulates accidents, with capacitation purposes, training, analysis and design. It emphasizes on the methodology used to establish the inter activity. Such methodology, is based on a modular structure in the one that multiple processes can be executed in an independent way and where the generated information is stored in segments of shared memory (characteristic that allows the UNIX operating system) and sent to the different processes by means of communication routines developed in C programming language. The utility of the system is demonstrated by means of the use of interactive display graphics (mimic diagrams, pictorials and tendency graphics) for the simultaneous dynamic visualization of the variables more significant that involve to the pattern of a transitory event type (for example failure of the controller of feeding water in a BWR reactor). Near with the interactive module, it was developed a model of the reactor of the CNLV for the code of better estimation RELAP/SCDAP. Finally the evaluation of the model is described, where it is interpreted in general form the behavior of those main variables that describe the stationary state, corroborating that follow the same tendency that those reported in the FSAR (Final Safety Analysis Report) of the Laguna Verde plant. The obtained results allow to conclude that the made development was satisfactory and that it presents enormous advantages regarding the capacity and time of analysis when using tools of visualization in real time of execution. (Author)

  14. Internal event analysis for Laguna Verde Unit 1 Nuclear Power Plant. Accident sequence quantification and results; Analisis de eventos internos para la Unidad 1 de la Central Nucleoelectrica de Laguna Verde. Cuantificacion de secuencias de accidente y resultados

    Energy Technology Data Exchange (ETDEWEB)

    Huerta B, A; Aguilar T, O; Nunez C, A; Lopez M, R [Comision Nacional de Seguridad Nuclear y Salvaguardias, 03000 Mexico D.F. (Mexico)

    1994-07-01

    The Level 1 results of Laguna Verde Nuclear Power Plant PRA are presented in the {sup I}nternal Event Analysis for Laguna Verde Unit 1 Nuclear Power Plant, CNSNS-TR 004, in five volumes. The reports are organized as follows: CNSNS-TR 004 Volume 1: Introduction and Methodology. CNSNS-TR4 Volume 2: Initiating Event and Accident Sequences. CNSNS-TR 004 Volume 3: System Analysis. CNSNS-TR 004 Volume 4: Accident Sequence Quantification and Results. CNSNS-TR 005 Volume 5: Appendices A, B and C. This volume presents the development of the dependent failure analysis, the treatment of the support system dependencies, the identification of the shared-components dependencies, and the treatment of the common cause failure. It is also presented the identification of the main human actions considered along with the possible recovery actions included. The development of the data base and the assumptions and limitations in the data base are also described in this volume. The accident sequences quantification process and the resolution of the core vulnerable sequences are presented. In this volume, the source and treatment of uncertainties associated with failure rates, component unavailabilities, initiating event frequencies, and human error probabilities are also presented. Finally, the main results and conclusions for the Internal Event Analysis for Laguna Verde Nuclear Power Plant are presented. The total core damage frequency calculated is 9.03x 10-5 per year for internal events. The most dominant accident sequences found are the transients involving the loss of offsite power, the station blackout accidents, and the anticipated transients without SCRAM (ATWS). (Author)

  15. Analysis of a natural draught tower in the circulation seawater system of nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Tijerina S, F.; Vargas A, A.

    2009-10-01

    The analysis of a natural draught tower in open circuit for the cooling system of seawater circulation on the nuclear power plant of Laguna Verde, it is based on conditions of 2027 MWt and 2317 MWt, where the flows of circulation water system hardly vary and whose purpose will be, to cool the seawater circulation. The circulation water system is used as heat drain in main condenser of turbo generator to condense the nuclear vapor. The annual average temperature in the seawater at present is of 26 C to the entrance to circulation water system and it is vary in accordance with the time of year. The mean temperature of leaving of circulation water system to the sea is of 41 C. Having a cooling tower to reduce the entrance temperature to the circulation water system, it improves the efficiency of thermal transfer in condenser, it improves the vacuum in condenser giving more operative margin to avoid condenser losses by air entrances and nuclear power plant shutdowns, as well as for to improve the efficiency of operative balance of nuclear power plant, also it prevents the impact in thermal transfer efficiency in condenser by the climatic change. (Author)

  16. Calculating of radiation doses in rutinary unloads of liquid wastes from Laguna Verde nuclear power plant.; Calculo de las dosis de radiacion debidas a las descargas rutinarias de desechos liquidos de la central nucleoelectrica de Laguna Verde.

    Energy Technology Data Exchange (ETDEWEB)

    Molina, G

    1986-12-31

    Utilization of nuclear energy to generate electricity is increasingly being used to replace fossil fuels. During operation of nuclear power plants, radioactive materials are produced, a small fraction of which are released to environment as liquid or gaseous effluents. Estimation of radiation doses caused by effluents release has three purposes. During design phase of a nuclear station it is useful to adapt the wastes treatment systems to acceptable limits. During licensing phase, the regulator organism verifies the design of nuclear station effectuating estimation of doses. Finally, during operation, before every unload of radioactive effluents, radiation doses should be evaluated in order to fulfill technical specifications limiting the release of radioactive materials to environment. 1. To perform calculations of individual doses due to liquid radioactive effluents unload in units 1 and 2 of Laguna Verde nuclear power plant (In licensing phase). 2. To perform a parametric study of the effect of unload recirculation over individual dose, since recirculation has two principal effects: thermodynamical effects in nuclear station and radioactivity concentration; the last can affect the fullfilment of dose limits. 3. To perform the calculation of collective doses causes by unloads of liquid effluents within a radius of 80 km of the plant caused by unload of liquid radioactive effluents during normal operation and does not include doses during accident conditions. In Mexico the organism in charge of regulation of peaceful uses of nuclear energy is Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) and for Laguna Verde licensing, the regulations of the country who manufactured the reactor (USA). In Appendix C, units are explained.

  17. Upgrade the intervention levels derived for water and foods, to be include in the PERE 607 procedure the external radiological emergency plan in the Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Llado Castillo, R.; Aguilar Pacheco, R.

    1998-01-01

    The work shows the results obtained in the upgrade the intervention levels derived for water and foods, to be include in the PERE 607 procedure the external radiological emergency plan in the Laguna Verde nuclear power plant

  18. Experiences in the implementation of the Coaching project in the nuclear power plant of Laguna Verde (NPP-L V)

    International Nuclear Information System (INIS)

    Mendez M, H. I.

    2012-10-01

    This document has the purpose of to share acquired experiences during the implementation of the Coaching project focused the training of supervisors and directive personnel of the nuclear power plant of Laguna Verde (NPP-L V). Derived of the improvement areas identified by the supervisor organization of the nuclear power stations WANO (World Association Nuclear of Operators) and of the auto-evaluations realized by the expert personnel of the same power station that based on external experiences carried out through the Benchmarking (comparison with other power stations) they have reflected the necessity to activate a training process in Coaching with a practical focus toward the directive and supervisor personnel in the power station. By means of the observation of the personnel's acting so much in the control rooms like in different areas, three focus areas have been identified for the training in Coaching, these are the personnel's motivation, the organizational communication so much in vertical form as horizontal and the perception of confidence lack among directive, supervisors, operators and technicians. The plan focused in the abilities training of Coaching with practical sense was development, supported with an evaluation of 360 grades as tool of competitions development through a computer application e-Coaching. The use of application and Coaching following techniques facilitated the conformation of the practical focus, same that are of continuous use starting from the training of the supervisor and directive personnel. (Author)

  19. Analysis of the preliminary trajectory of emergency venting of the nuclear power plant of Laguna Verde using RELAP5

    International Nuclear Information System (INIS)

    Cecenas F, M.; Jimenez S, R.; Ovando C, R.; Tijerina S, F.; Tapia M, R. N.

    2016-09-01

    For a commercial nuclear plant, the availability of a vent line to the atmosphere is an improvement to achieve the prevention and mitigation of the consequences of a severe accident. The importance of this system received greater attention after the Fukushima accident in 2011. Subsequently, in 2012 and 2013, the United States Nuclear Regulatory Commission issued documents stating that the venting must be able to dislodge 1% of the rated thermal power of the core without over pressurizing the primary container. To analyze the venting of the nuclear power plant of Laguna Verde, the line and the primary container are modeled using the thermo-hydraulic code RELAP5, simulating a release of 1% of the nominal licensed power to the container in the form of saturated steam. The vent has no problem to evacuate the energy and manages to keep the container without exceeding its design limit, and the highest percentage of thermal power that can channel the vent to the outside is approximately 3%. A sensitivity analysis increasing the diameter of the line to 14 inches allows increasing in 10% the percentage of power that can be vented to the outside without problem for the containment. (Author)

  20. Application of new control technology during the maintenance of equipment in the Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Ojeda R, M. A.

    2008-01-01

    In the nuclear power plant of Laguna Verde, in normal operation and recharges are carried out activities of preventive maintenance and corrective to different equipment, due to the one displacement of radioactive materials from the vessel of the reactor until the one system of vapor, different radiation levels are generated (from low until very high) in the circuits of vapor and water, the particles can be incrusted on those interior surfaces of the pipes and equipment, creating this way a potential risk of contamination and exhibition during the maintenance of equipment. To help to optimize the dose to the personnel the use of new technology the has been implemented which besides contributing an absolute control of the work, it offers bigger comfort to the one worker during the development of their work, also contributing a supervision more effective of the same one. Using the captured and processed information of the work developed you can use for the personnel's capacitation and feedback of the work for the continuous improvement of the same one. During a reduction of programmed power and normal operation are carried out maintenance correctives and specific works to preserve the readiness and ability of the equipment and with this to maintain the security of the nuclear power plant. The development of the theme it is showing the advances and commitments of personnel to take to excellence to the nuclear power plant of Laguna Verde showing to the obtained results of the dose and benefits of 2 works carried out in the nuclear power plant where tools ALARA were applied as well as the use of the new technology (Video Equipment of Tele dosimetry and Audio 'VETA') in works carried out in the building of purification level 10.15, change and cuts of filter of the prefilters of system G16, as well as,the retirement and transfer for its decay of High Integrity Container (HIC) of the building of purification level -0.55 to the Temporary Warehouse in Site. Works of high

  1. Questions to the reactors power upgrade of the Nuclear Power Plant of Laguna Verde; Cuestionamientos al aumento de potencia de los reactores de la Central Nuclear de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Salas M, B., E-mail: salasmarb@yahoo.com.mx [UNAM, Facultad de Ciencias, Departamento de Fisica, Circuito exterior s/n, Ciudad Universitaria, 04510 Mexico D. F. (Mexico)

    2014-08-15

    The two reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) were subjected to power upgrade labors with the purpose of achieving 20% upgrade on the original power; these labors concluded in August 24, 2010 for the Reactor 1 and in January 16, 2011 for the Reactor 2, however in January of 2014, the NNP-L V has not received by part of the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) the new Operation License to be able to work with the new power, because it does not fulfill all the necessary requirements of safety. In this work is presented and analyzed the information obtained in this respect, with data provided by the Instituto Federal de Acceso a la Informacion Publica y Proteccion de Datos (IFAI) and the Comision Federal de Electricidad (CFE) in Mexico, as well as the opinion of some workers of the NPP-L V. The Governing Board of the CFE announcement that will give special continuation to the behavior on the operation and reliability of the NPP-L V, because the frequency of not announced interruptions was increased 7 times more in the last three years. (Author)

  2. Modernization of the Electric Power Systems (transformers, rods and switches) in the Laguna Verde Nuclear Power Plant (Mexico); Modernizacion de los Sistemas Electricos de Potencia (Transformadores de Principales, Interruptor de Generacion, Barras de Fase Aislada) de la Central Nuclear de Laguna Verde (Mexico)

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez Solarzano, J. J.; Gabaldon Martin, M. A.; Pallisa Nunez, J.; Florez Ordeonez, A.; Fernandez Corbeira, A.; Prieto Diez, I.

    2010-07-01

    Description of the changes made in the Electric Power Systems as a part of the power increase project in the Laguna Verde Nuclear Power Plant (Mexico). The main electrical changes to make, besides the turbo group, are the main generation transformers, the isolated rods and the generation switch.

  3. Estimation of requirements of eolic energy equivalent to the electric generation of the Laguna Verde nuclear power plant; Estimacion de requerimientos de energia eolica equivalente a la generacion electrica de la Central Nucleoelectrica de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Garcia V, M.A.; Hernandez M, I.A. [Facultad de Ingenieria, Division de Ingenieria Electrica, UNAM, 04510 Mexico D.F. (Mexico)]. E-mail: maiki27@yahoo.com; Martin del Campo M, C. [Facultad de Ingenieria, Laboratorio de Analisis en Ingenieria de Reactores Nucleares, UNAM, Paseo Cuauhnahuac 8532, 62550 Jiutepec, Morelos (Mexico)

    2004-07-01

    The advantages are presented that have the nuclear and eolic energy as for their low environmental impact and to the human health. An exercise is presented in the one that is supposed that the electric power generated by the Laguna Verde Nuclear Power plant (CNLV), with capacity of 1365 M W, it should be produced by eolic energy when in the years 2020 and 2025 the units 1 and 2 of the CNLV reach its useful life and be moved away. It is calculated the number of aero generators that would produce the electric power average yearly of the CNLV, that which is equal to install eolic parks with capacity of 2758 M W, without considering that it will also be invested in systems of back generation to produce electricity when the aero generators stops for lack of wind. (Author)

  4. Recent nuclear technology advances of GE-H and GNF in partnership with CFE's Laguna Verde 2

    International Nuclear Information System (INIS)

    Cuevas V, G.; Iwamoto, T.; Banfield, J.; Calleros M, G.

    2015-09-01

    This paper is presented based on work stemming from the long-standing technical partnership between Comision Federal de Electricidad (CFE) and Global Nuclear Fuel - Americas LLC (GNF), and this paper's purpose is to provide valuable information for the nuclear industry. First, a one-to-one comparison of measurements from Gamma Thermometers (G Ts) installed in Laguna Verde 2 (LV-2) core against axially corresponding Traverse In-core Probe (Tip) measurements is remarkably close. This longest running G T plant validation for the Economic Simplified Boiling Water Reactor (ESBWR) power monitoring devices is also proving that the devices have the potential to simplify power measurements in Boiling Water Reactors (BWRs). Second, code validation results show remarkable reduction of radial power uncertainty with respect to current technology when new GNF codes for three-dimensional core simulations are compared to Tip power measurements. The LV-2 core is of paramount importance for BWR data analysis since the core has been loaded from the start of operation with different GNF fuel bundle types, fuel management has been designed with GNF codes and on-line core monitoring has been performed with GNF's 3-Dimensional Monicore system. This validation is also reliable since gamma Tips are used for local power measurements rather than thermal neutron Tips, which are more sensitive to local turbulence and positional changes. A nuclear/thermal-hydraulic core simulation of GNF fuel is undertaken from the beginning of operation of LV-2 (cycle 1) through the range of different power scenarios including low power, original licensed thermal power, power up rate and extended power up rate. Results confirm the conclusions from previous validations in different BWRs and support GNF efforts for licensing the new generation of nuclear engineering codes. (Author)

  5. Recent nuclear technology advances of GE-H and GNF in partnership with CFE's Laguna Verde 2

    Energy Technology Data Exchange (ETDEWEB)

    Cuevas V, G.; Iwamoto, T.; Banfield, J. [GE-Hitachi Nuclear Energy Americas LLC, Global Nuclear Fuel - Americas LLC, 3901 Castle Hayne Road, Wilmington, 28401 North Carolina (United States); Calleros M, G., E-mail: Gabriel.Cuevas-Vivas@age.com [Comision Federal de Electricidad, Central Nucleoelectrica de Laguna Verde, Carretera Veracruz-Nautla Km 42.5, Alto Lucero, Veracruz (Mexico)

    2015-09-15

    This paper is presented based on work stemming from the long-standing technical partnership between Comision Federal de Electricidad (CFE) and Global Nuclear Fuel - Americas LLC (GNF), and this paper's purpose is to provide valuable information for the nuclear industry. First, a one-to-one comparison of measurements from Gamma Thermometers (G Ts) installed in Laguna Verde 2 (LV-2) core against axially corresponding Traverse In-core Probe (Tip) measurements is remarkably close. This longest running G T plant validation for the Economic Simplified Boiling Water Reactor (ESBWR) power monitoring devices is also proving that the devices have the potential to simplify power measurements in Boiling Water Reactors (BWRs). Second, code validation results show remarkable reduction of radial power uncertainty with respect to current technology when new GNF codes for three-dimensional core simulations are compared to Tip power measurements. The LV-2 core is of paramount importance for BWR data analysis since the core has been loaded from the start of operation with different GNF fuel bundle types, fuel management has been designed with GNF codes and on-line core monitoring has been performed with GNF's 3-Dimensional Monicore system. This validation is also reliable since gamma Tips are used for local power measurements rather than thermal neutron Tips, which are more sensitive to local turbulence and positional changes. A nuclear/thermal-hydraulic core simulation of GNF fuel is undertaken from the beginning of operation of LV-2 (cycle 1) through the range of different power scenarios including low power, original licensed thermal power, power up rate and extended power up rate. Results confirm the conclusions from previous validations in different BWRs and support GNF efforts for licensing the new generation of nuclear engineering codes. (Author)

  6. Preliminary analysis of an hydrogen generator system based on nuclear energy in the Laguna Verde site; Analisis preliminar de un sistema generador de hidrogeno basado en energia nuclear en el sitio de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Flores y Flores, A [FI-UNAM, 04500 Mexico D.F. (Mexico); Francois L, J L [FI-UNAM, Jiutepec, Morelos (Mexico)

    2003-07-01

    The shortage of fossil fuels in the next future, as well as the growing one demand of energetics and the high cost of the production of alternating fuels, it forces us to take advantage of to the maximum the fossil fuel with the one which we count and to look for the form of producing alternating fuels at a low cost and better even if these supply sources are reliable and non pollutants. It is intended a solution to the shortage of fuel; to use the thermal energy liberated of some appropriate nuclear reactor to be able to obtain a fuel but clean and relatively cheap as it is the hydrogen. In the first place the methods were looked for to produce hydrogen using thermal energy, later it was analyzed the temperature liberated by the existent nuclear reactors as well as the advanced designs, according to this liberated temperature settled down that the methods but feasible to produce hydrogen its were the one of reformed with water stream of the natural gas (methane) and the other one of the S-I thermochemical cycle, and the nuclear reactors that give the thermal energy for this production they are those of gas of high temperature. Once established the processes and the appropriate reactors, it was analyzed the site of Laguna Verde, with relationship to the free space to be able to place the reactor and the plant producer of hydrogen, as well as the direction in which blow the dominant winds and the near towns to the place, it was carried out an analysis of some explosion of tanks that could store hydrogen and the damage that its could to cause depending from the distance to which its were of the fire. Finally it was carried out an evaluation of capital and of operation costs for those two methods of hydrogen production. (Author)

  7. Estimation of seismic return periods in the Laguna Verde nuclear plant; Estimacion de periodos de retorno sismico en la PNLV

    Energy Technology Data Exchange (ETDEWEB)

    Flores R, J.H

    1992-01-15

    The study of seismic risk in the area of the Laguna Verde Nucleo electric plant (PNLV) and its surroundings, one carries out estimating the different return periods and the occurrence probability in different intervals of time (5, 75, 100, 125, 150 years starting from the distribution of first type of Gumbel (G1) of extreme values (Burton, 1986), the value that was used to evaluate the useful life of the PNLV was of 50 years, the other periods will be occupy to evaluate 'temporal' nuclear cemeteries, that is to say for diminish the radioactive activity of the fuel assemblies already burned in the reactor pool or in a near place to the place. The seismic data that were used for the analysis were of the seismic catalog that it was elaborated from (1920-1982), around the place whose seismic half magnitude was of 5 grades Richter and a depth 65 km, these earthquakes are classified as shallow earthquakes, which are located in the continental plaque of North-America, these they are induced by the efforts of push of the plaque of Cocos, existing 36% of intermediate and 2 of deep earthquakes. (Author)

  8. Estimation of seismic return periods in the Laguna Verde nuclear plant; Estimacion de periodos de retorno sismico en la PNLV

    Energy Technology Data Exchange (ETDEWEB)

    Flores R, J H

    1992-01-15

    The study of seismic risk in the area of the Laguna Verde Nucleo electric plant (PNLV) and its surroundings, one carries out estimating the different return periods and the occurrence probability in different intervals of time (5, 75, 100, 125, 150 years starting from the distribution of first type of Gumbel (G1) of extreme values (Burton, 1986), the value that was used to evaluate the useful life of the PNLV was of 50 years, the other periods will be occupy to evaluate 'temporal' nuclear cemeteries, that is to say for diminish the radioactive activity of the fuel assemblies already burned in the reactor pool or in a near place to the place. The seismic data that were used for the analysis were of the seismic catalog that it was elaborated from (1920-1982), around the place whose seismic half magnitude was of 5 grades Richter and a depth 65 km, these earthquakes are classified as shallow earthquakes, which are located in the continental plaque of North-America, these they are induced by the efforts of push of the plaque of Cocos, existing 36% of intermediate and 2 of deep earthquakes. (Author)

  9. Application of the source term code package to obtain a specific source term for the Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Souto, F.J.

    1991-06-01

    The main objective of the project was to use the Source Term Code Package (STCP) to obtain a specific source term for those accident sequences deemed dominant as a result of probabilistic safety analyses (PSA) for the Laguna Verde Nuclear Power Plant (CNLV). The following programme has been carried out to meet this objective: (a) implementation of the STCP, (b) acquisition of specific data for CNLV to execute the STCP, and (c) calculations of specific source terms for accident sequences at CNLV. The STCP has been implemented and validated on CDC 170/815 and CDC 180/860 main frames as well as on a Micro VAX 3800 system. In order to get a plant-specific source term, data on the CNLV including initial core inventory, burn-up, primary containment structures, and materials used for the calculations have been obtained. Because STCP does not explicitly model containment failure, dry well failure in the form of a catastrophic rupture has been assumed. One of the most significant sequences from the point of view of possible off-site risk is the loss of off-site power with failure of the diesel generators and simultaneous loss of high pressure core spray and reactor core isolation cooling systems. The probability for that event is approximately 4.5 x 10 -6 . This sequence has been analysed in detail and the release fractions of radioisotope groups are given in the full report. 18 refs, 4 figs, 3 tabs

  10. Feasibility analysis in the expansion proposal of the nuclear power plant Laguna Verde: application of real options, binomial model; Analisis de viabilidad en la propuesta de expansion de la central nucleoelectrica Laguna Verde: aplicacion de opciones reales, modelo binomial

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez I, S.; Ortiz C, E.; Chavez M, C., E-mail: lunitza@gmail.com [UNAM, Facultad de Ingenieria, Circuito Interior, Ciudad Universitaria, 04510 Mexico D. F. (Mexico)

    2011-11-15

    At the present time, is an unquestionable fact that the nuclear electrical energy is a topic of vital importance, no more because eliminates the dependence of the hydrocarbons and is friendly with the environment, but because is also a sure and reliable energy source, and represents a viable alternative before the claims in the growing demand of electricity in Mexico. Before this panorama, was intended several scenarios to elevate the capacity of electric generation of nuclear origin with a variable participation. One of the contemplated scenarios is represented by the expansion project of the nuclear power plant Laguna Verde through the addition of a third reactor that serves as detonator of an integral program that proposes the installation of more nuclear reactors in the country. Before this possible scenario, the Federal Commission of Electricity like responsible organism of supplying energy to the population should have tools that offer it the flexibility to be adapted to the possible changes that will be presented along the project and also gives a value to the risk to future. The methodology denominated Real Options, Binomial model was proposed as an evaluation tool that allows to quantify the value of the expansion proposal, demonstrating the feasibility of the project through a periodic visualization of their evolution, all with the objective of supplying a financial analysis that serves as base and justification before the evident apogee of the nuclear energy that will be presented in future years. (Author)

  11. New recommendations of the ICRP and the ALARA program of the Nuclear power plant of Laguna Verde; Nuevas recomendaciones del ICRP y el programa ALARA de la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Padilla C, I [Comision Federal de Electricidad, Central Laguna Verde (Mexico)

    1991-07-01

    In view of the events happened in it finishes it decade, in the nuclear environment, it is necessary that any he/she practices that it involves exhibition to the radiation, real or potential, be detailed and systematically analyzed by the light of the current knowledge, capitalizing the generated experience. They think about three fundamental aspects in the campaign of radiological cultivation: 1. New methods of evaluation of equivalent dose. 2. Limit of individual dose, base of the change and control implications, and 3. Analysis philosophies and the application of the system of dose limitation. The program ALARA of the Laguna Verde Central from its installation in 1987 observes and it implements actions trending to optimize it practice of situation of potential and planned exhibition with the purpose of fulfilling the commitment settled down in the declaration of political of this program.

  12. Effects evaluation of artificial aging by temperature and gamma radiation on cables for Laguna Verde nuclear power plant (LVNPP)

    Energy Technology Data Exchange (ETDEWEB)

    Vazquez C, R. M.; Bonifacio M, J.; Garcia H, E. E.; Loperena Z, J. A. [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico); Garcia M, C., E-mail: raulmario.vazquez@inin.gob.m [CFE, Central Nuclear Laguna Verde, Km. 42.5 Carretera Cardel-Nautla, Veracruz (Mexico)

    2010-10-15

    A set of tests has been carried out at the Equipment Qualification Laboratory at National Institute of Nuclear Research to perform accelerated aging up to 60 years under temperature and gamma radiation environment for electrical cables. The results obtained from such tests are the base line data for comparison to with the current cable conditions at the plant. This work is intended for establishing the cable aging management program for the Laguna Verde nuclear power plant (LVNPP). For such purpose, the Institute has prepared methodologies and procedures to apply condition monitoring techniques in accelerated aging tests on samples of new cables drawn from the LVNPP warehouse. The condition indicators of the material selected for condition monitoring and the aging management process of cables were: Elongation at Break (EAB) and Oxidation Induction Time (OIT). A cable aging management program includes activities for cable selection, determination of condition indicators of the cable materials (EAB, OIT, Ind enter), accelerated aging of cable samples at the laboratory, analysis of maintenance history, operational experience of the plant and analysis of the environmental and service conditions (temperature and gamma radiation), as well as the establishment of a condition monitoring plan for cables in the plant. Two cable model samples were thermally aged and gamma irradiated with doses corresponding to differential operational periods. EAB and OIT values of cable insulating material (ethylene propylene and cross linked polyethylene) were obtained. It was found that the EAB and OIT data correlation is very closed, and it could be applied to infer values that are not possible to measure directly at the plant and be used for cable aging evaluation and remaining life time determination. (Author)

  13. Development of an interactive model of the Laguna Verde nuclear power plant based on the RELAP/SCDAP code; Desarrollo del modelo interactivo de la central nucleoelectrica de Laguna Verde basado en el codigo RELAP/SCDAP

    Energy Technology Data Exchange (ETDEWEB)

    Salazar C, J.H.; Ramos P, J.C.; Salazar S, E.; Chavez M, C. [LAIRN, FI-UNAM, DEPFI Campus Morelos, Jiutepec, Morelos (Mexico)]. e-mail: cchavez2@cableonline.com.mx

    2003-07-01

    The present work describes the development of an interactive model of the Nuclear power plant of Laguna Verde (CNLV) based on the RELAP/SCDAP nuclear code, and it incorporation to a classroom simulator. The functional prototype it allows to make evaluations for operational transients and postulates accidents, with capacitation purposes, training, analysis and design. It emphasizes on the methodology used to establish the inter activity. Such methodology, is based on a modular structure in the one that multiple processes can be executed in an independent way and where the generated information is stored in segments of shared memory (characteristic that allows the UNIX operating system) and sent to the different processes by means of communication routines developed in C programming language. The utility of the system is demonstrated by means of the use of interactive display graphics (mimic diagrams, pictorials and tendency graphics) for the simultaneous dynamic visualization of the variables more significant that involve to the pattern of a transitory event type (for example failure of the controller of feeding water in a BWR reactor). Near with the interactive module, it was developed a model of the reactor of the CNLV for the code of better estimation RELAP/SCDAP. Finally the evaluation of the model is described, where it is interpreted in general form the behavior of those main variables that describe the stationary state, corroborating that follow the same tendency that those reported in the FSAR (Final Safety Analysis Report) of the Laguna Verde plant. The obtained results allow to conclude that the made development was satisfactory and that it presents enormous advantages regarding the capacity and time of analysis when using tools of visualization in real time of execution. (Author)

  14. Study of environmental noise in a BWR plant like the Nuclear Power Plant Laguna Verde; Estudio de ruido ambiental en una planta BWR como la Central Nuclear Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Tijerina S, F.; Cruz G, M.; Amador C, C., E-mail: francisco.tijerina@cfe.gob.mx [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Subgerencia de Ingenieria, Carretera Cardel-Nautla Km. 42.5, Alto Lucero, Veracruz (Mexico)

    2013-10-15

    In all industry type the health costs generated by the noise are high, because the noise can cause nuisance and to harm the capacity to work when causing tension and to perturb the concentration, and in more severe cases to reach to lose the sense of the hearing in the long term. The noise levels in the industry have been designated for the different types of use like residential, commercial, and industrial and silence areas. The noise can cause accidents when obstructing the communications and alarm signs. For this reason the noise should be controlled and mitigated, at a low level as reasonably is possible, taking into account that the noise is an acoustic contamination. The present study determines a bases line of the environmental noise levels in a nuclear power plant BWR-5 as Laguna Verde, (like reference) to be able to determine and to give pursuit to the possible solutions to eliminate or to limit the noise level in the different job areas. The noise levels were registered with a meter of integrative noise level (sonometer) and areas of noise exposure levels mapping the general areas in the buildings were established, being the registered maximum level of 96.94 dba in the building of the Reactor-elevation 0.65 m under the operation conditions of Extended Power Up rate (EPU) of 120% PTN. Knowing that the exposition to noises and the noise dose in the job place can influence in the health and in the safety of the workers, are extensive topics that they should be analyzed for separate as they are: to) the effects in the health of the exposure to the noise, b) how measuring the noise, c) the methods and technologies to combat and to control the noise in the industry by part of engineering area and d) the function of the industrial safety bodies as delegates of the health and safety in the task against the noise in the job. (author)

  15. Leak rates and structural integrity tests for Laguna Verde Nuclear Power Plant primary containment. Regulatory experience

    International Nuclear Information System (INIS)

    Mamani Alegria, Yuri Raul; Salgado Gonzalez, Julio Ricardo

    1996-01-01

    In the Appendix A General Design Criteria for Nuclear Power Plants of the US Code of Federal Regulations title 10 part 50 (10CFR50) is established the Criterion 1 Quality standards and records which requires that structures, systems and components important to safety should be tested to quality standards according with the importance of the safety function to be performed. This regulation has been adopted by the Mexican Regulatory Body (CNSNS) for their nuclear power plants. (author)

  16. Analysis of a natural draught tower in the circulation seawater system of nuclear power plant of Laguna Verde; Analisis de una torre de tiro natural en el sistema de agua de circulacion de mar de la central nucleoelectrica Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Tijerina S, F.; Vargas A, A. [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Subgerencia de Ingenieria, Carretera Veracruz-Medellin Km. 7.5, Veracruz (Mexico)], e-mail: francisco.tijerina@cfe.gob.mx

    2009-10-15

    The analysis of a natural draught tower in open circuit for the cooling system of seawater circulation on the nuclear power plant of Laguna Verde, it is based on conditions of 2027 MWt and 2317 MWt, where the flows of circulation water system hardly vary and whose purpose will be, to cool the seawater circulation. The circulation water system is used as heat drain in main condenser of turbo generator to condense the nuclear vapor. The annual average temperature in the seawater at present is of 26 C to the entrance to circulation water system and it is vary in accordance with the time of year. The mean temperature of leaving of circulation water system to the sea is of 41 C. Having a cooling tower to reduce the entrance temperature to the circulation water system, it improves the efficiency of thermal transfer in condenser, it improves the vacuum in condenser giving more operative margin to avoid condenser losses by air entrances and nuclear power plant shutdowns, as well as for to improve the efficiency of operative balance of nuclear power plant, also it prevents the impact in thermal transfer efficiency in condenser by the climatic change. (Author)

  17. Seismic reflection surveys in central Palo Duro basin

    International Nuclear Information System (INIS)

    Acharya, H.; Buller, M.L.; Lewkowicz, J.; Murphy, P.

    1983-01-01

    Seismic reflection surveys have been conducted in the central Palo Duro basin to provide a basis for identifying localities suitable for the emplacement of an underground high level nuclear waste repository. The objectives of this effort were to determine the structure and stratigraphy in the central Palo Duro basin and evaluate the potential for hydrocarbon resources. Of primary interest is the Upper Permian salt section to a depth of about 3000 ft (914 m). Various tests were carried out along a 3 mi (5 km) segment to determine the most appropriate combination of vibrating source and recording parameters. Approximately 130 mi (209 km) of 24-fold CDP stacked data were acquired. The survey lines were tied to test wells in which velocity surveys were conducted. These data were supplemented by about 400 mi (644 km) of available proprietary CDP stacked data. Analysis of these data strongly suggests that central Palo Duro basin has been tectonically stable since Early Permian time. The maximum offset of the basement is about 600 ft (183 m). These basement faults do not appear to affect any strata above. The San Andres Formation and underlying formations can be traced continuously throughout the area surveyed. Available velocity data from various wells in the central Palo Duro basin show few anomalies, confirming the continuity of the reflecting horizons and the tectonic stability of the area. Hydrocarbon potential of the area is presently being evaluated. The preliminary results of this study are in agreement with the stratigraphic correlations among well logs in the Palo Duro basin

  18. Cape Verde

    Science.gov (United States)

    2007-01-01

    This Mars Exploration Rover Opportunity Pancam 'super resolution' mosaic of the approximately 6 m (20 foot) high cliff face of the Cape Verde promontory was taken by the rover from inside Victoria Crater, during the rover's descent into Duck Bay. Super-resolution is an imaging technique which utilizes information from multiple pictures of the same target in order to generate an image with a higher resolution than any of the individual images. Cape Verde is a geologically rich outcrop and is teaching scientists about how rocks at Victoria crater were modified since they were deposited long ago. This image complements super resolution mosaics obtained at Cape St. Mary and Cape St. Vincent and is consistent with the hypothesis that Victoria crater is located in the middle of what used to be an ancient sand dune field. Many rover team scientists are hoping to be able to eventually drive the rover closer to these layered rocks in the hopes of measuring their chemistry and mineralogy. This is a Mars Exploration Rover Opportunity Panoramic Camera image mosaic acquired on sols 1342 and 1356 (November 2 and 17, 2007), and was constructed from a mathematical combination of 64 different blue filter (480 nm) images.

  19. Analysis of internal events for the Unit 1 of the Laguna Verde nuclear power station; Analisis de eventos internos para la Unidad 1 de la Central Nucleolelectrica de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Huerta B, A.; Aguilar T, O.; Nunez C, A.; Lopez M, R. [Comision Nacional de Seguridad Nuclear y Salvaguardias, 03000 Mexico D.F. (Mexico)

    1993-07-01

    This volume presents the results of the starter event analysis and the event tree analysis for the Unit 1 of the Laguna Verde nuclear power station. The starter event analysis includes the identification of all those internal events which cause a disturbance to the normal operation of the power station and require mitigation. Those called external events stay beyond the reach of this study. For the analysis of the Laguna Verde power station eight transient categories were identified, three categories of loss of coolant accidents (LOCA) inside the container, a LOCA out of the primary container, as well as the vessel break. The event trees analysis involves the development of the possible accident sequences for each category of starter events. Events trees by systems for the different types of LOCA and for all the transients were constructed. It was constructed the event tree for the total loss of alternating current, which represents an extension of the event tree for the loss of external power transient. Also the event tree by systems for the anticipated transients without scram was developed (ATWS). The events trees for the accident sequences includes the sequences evaluation with vulnerable nucleus, that is to say those sequences in which it is had an adequate cooling of nucleus but the remoting systems of residual heat had failed. In order to model adequately the previous, headings were added to the event tree for developing the sequences until the point where be solved the nucleus state. This process includes: the determination of the failure pressure of the primary container, the evaluation of the environment generated in the reactor building as result of the container failure or cracked of itself, the determination of the localization of the components in the reactor building and the construction of boolean expressions to estimate the failure of the subordinated components to an severe environment. (Author)

  20. Analysis of the preliminary trajectory of emergency venting of the nuclear power plant of Laguna Verde using RELAP5; Analisis de la trayectoria preliminar del venteo de emergencia de la Central Laguna Verde mediante RELAP5

    Energy Technology Data Exchange (ETDEWEB)

    Cecenas F, M.; Jimenez S, R.; Ovando C, R. [Instituto Nacional de Electricidad y Energias Limpias, Reforma No. 113, Col. Palmira, 42490 Cuernavaca, Morelos (Mexico); Tijerina S, F.; Tapia M, R. N., E-mail: mcf@iie.org.mx [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Subgerencia de Ingenieria, Carretera Veracruz-Medellin Km. 7.5, 94271 Veracruz (Mexico)

    2016-09-15

    For a commercial nuclear plant, the availability of a vent line to the atmosphere is an improvement to achieve the prevention and mitigation of the consequences of a severe accident. The importance of this system received greater attention after the Fukushima accident in 2011. Subsequently, in 2012 and 2013, the United States Nuclear Regulatory Commission issued documents stating that the venting must be able to dislodge 1% of the rated thermal power of the core without over pressurizing the primary container. To analyze the venting of the nuclear power plant of Laguna Verde, the line and the primary container are modeled using the thermo-hydraulic code RELAP5, simulating a release of 1% of the nominal licensed power to the container in the form of saturated steam. The vent has no problem to evacuate the energy and manages to keep the container without exceeding its design limit, and the highest percentage of thermal power that can channel the vent to the outside is approximately 3%. A sensitivity analysis increasing the diameter of the line to 14 inches allows increasing in 10% the percentage of power that can be vented to the outside without problem for the containment. (Author)

  1. Experiences in the implementation of the Coaching project in the nuclear power plant of Laguna Verde (NPP-L V); Experiencias en la implementacion del proyecto Coaching en la Central Nucleoelectrica Laguna Verde (CNLV)

    Energy Technology Data Exchange (ETDEWEB)

    Mendez M, H. I., E-mail: hugo.mendez01@cfe.gob.mx [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Departamento del Centro de Entrenamiento, Carretera Cardel-Nautla Km 42.5, Alto Lucero, Veracruz (Mexico)

    2012-10-15

    This document has the purpose of to share acquired experiences during the implementation of the Coaching project focused the training of supervisors and directive personnel of the nuclear power plant of Laguna Verde (NPP-L V). Derived of the improvement areas identified by the supervisor organization of the nuclear power stations WANO (World Association Nuclear of Operators) and of the auto-evaluations realized by the expert personnel of the same power station that based on external experiences carried out through the Benchmarking (comparison with other power stations) they have reflected the necessity to activate a training process in Coaching with a practical focus toward the directive and supervisor personnel in the power station. By means of the observation of the personnel's acting so much in the control rooms like in different areas, three focus areas have been identified for the training in Coaching, these are the personnel's motivation, the organizational communication so much in vertical form as horizontal and the perception of confidence lack among directive, supervisors, operators and technicians. The plan focused in the abilities training of Coaching with practical sense was development, supported with an evaluation of 360 grades as tool of competitions development through a computer application e-Coaching. The use of application and Coaching following techniques facilitated the conformation of the practical focus, same that are of continuous use starting from the training of the supervisor and directive personnel. (Author)

  2. Revision of documents guide to obtain the renovation of licence of the nuclear power plant of Laguna Verde, Units I and II

    International Nuclear Information System (INIS)

    Jarvio C, G.; Fernandez S, G.

    2008-01-01

    Unquestionably the renovation of license of the nuclear power plants , it this converting in a promising option to be able to gather in sure, reliable form and economic those requests about future energy in the countries with facilities of this type. This work it analyzes four documents guide and their application for the determination of the renovation of it licenses in nuclear plants that will serve of base for their aplication in the Nuclear Power Plant of Laguna Verde Units I and 2. The four documents in question are: the one Inform Generic of Learned Lessons on the Aging (NUREG - 1801), the Standard Revision Plan for the Renovation of License (NUREG - 1800), the Regulatory Guide for Renovation of License (GR-1.188), and the NEI 95-10, developed by the Institute of Nuclear Energy that is an Industrial Guide to Implement the Requirements of the 1OCFR Part 54-the Rule of Renovation of It licenses. (Author)

  3. Validation of a new version of software for monitoring the core of nuclear power plant of Laguna Verde Unit 2, at the end of Cycle 10

    International Nuclear Information System (INIS)

    Hernandez, G.; Calleros, G.; Mata, F.

    2009-10-01

    This work shows the differences observed in thermal limits established in the technical specifications of operation, among the new software, installed at the end of Cycle 10 of Unit 2 of nuclear power plant of Laguna Verde, and the old software that was installed from the beginning of the cycle. The methodology allowed to validate the new software during the coast down stage, before finishing the cycle, for what could be used as tool during the shutdown of Unit 2 at the end of Cycle 10. (Author)

  4. Methodology of aging management in structures, systems and components of a nuclear power plant and its application to a pilot program in Laguna Verde

    International Nuclear Information System (INIS)

    Jarvio C, G.; Fernandez S, G.

    2009-10-01

    From its origin the nuclear power plants confront the effects of time and of environment, giving as result the aging of its structures, systems and components. In this document the general process is described for the establishment of Aging Management Program developed by IAEA. Following the program methodology is guaranteed that a nuclear power plant manages the aging effects appropriately and to make decisions for its solution, assuring the characteristic functions of structures, systems and components of same nuclear power plant. On the other hand, the implantation of an aging management program constitutes the base for development of a licence renovation program, like it can be the specific case of the Central Laguna Verde Units 1 and 2. (Author)

  5. Advanced light water reactor program at ABB-Combustion Engineering Nuclear Power

    International Nuclear Information System (INIS)

    Cahn, H.

    1990-01-01

    To meet the needs of Electric Utilities ordering nuclear power plants in the 1990s, ABB-Combustion Engineering is developing two designs which will meet EPRI consensus requirements and new licensing issues. The System 80 Plus design is an evolutionary pressurized water reactor plant modelled after the successful System 80 design in operation in Palo Verde and under construction in Korea. System Plus is currently under review by the US Nuclear Regulatory Commission with final design approval expected in 1991 and design certification in 1992. The Safe Integral Reactor (SIR) plant is a smaller facility with passive safety features and modular construction intended for design certification in the late 1990s. (author)

  6. Study and characterization of noble metal deposits on similar rusty surfaces to those of the reactor U-1 type BWR of nuclear power station of Laguna Verde

    International Nuclear Information System (INIS)

    Flores S, V. H.

    2011-01-01

    In the present investigation work, were determined the parameters to simulate the conditions of internal oxidation reactor circulation pipes of the nuclear power plant of Laguna Verde in Veracruz. We used 304l stainless steel cylinders with two faces prepared with abrasive paper of No. 600, with the finality to obtain similar surface to the internal circulation piping nuclear reactor. Oxides was formed within an autoclave (Autoclave MEX-02 unit B), which is a device that simulates the working conditions of the nuclear reactor, but without radiation generated by the fission reaction within the reactor. The oxidation conditions were a temperature of 280 C and pressure of 8 MPa, similar conditions to the reactor operating in nuclear power plant of Laguna Verde in Veracruz, Mexico (BWR conditions), with an average conductivity of 4.58 ms / cm and 2352 ppb oxygen to simulate normal water chemistry NWC. Were obtained deposits of noble metal oxides formed on 304l stainless steel samples, in a 250 ml autoclave at a temperature range of 180 to 200 C. The elements that were used to deposit platinum-rhodium (Pt-Rh) with aqueous Na 2 Pt (OH) 6 and Na 3 Rh (NO 2 ) 6 , Silver (Ag) with an aqueous solution of AgNO 3 , zirconium (Zr) with aqueous Zr O (NO 3 ) and ZrO 2 , and zinc (Zn) in aqueous solution of Zn (NO 3 ) 2 under conditions of normal water chemistry. Also there was the oxidation of 304l stainless steel specimens in normal water chemistry with a solution of Zinc (Zn) (NWC + Zn). Oxidation of the specimens in water chemistry with a solution of zinc (Zn + NWC) was prepared in two ways: within the MEX-02 autoclave unit A in a solution of zinc and a flask at constant temperature in zinc solution. The oxides formed and deposits were characterized by scanning electron microscopy, energy dispersive X-ray analysis, elemental field analysis and X-ray diffraction. By other hand was evaluated the electrochemical behavior of the oxides formed on the surface of 304l stainless steel

  7. Identification of sites within the Palo Duro Basin. Volume 1. Palo Duro Location A

    International Nuclear Information System (INIS)

    1984-11-01

    This three-volume document narrows to two sites for continued investigations for potential nuclear waste repository sites in the Palo Duro Basin of the Texas Panhandle. Volume 1 narrows a site previously identified in Deaf Smith County, Texas; Volume 2 narrows a site previously identified in Swisher County, Texas; and Volume 3 contains responses to comments received regarding the drafts of Volumes 1 and 2 (BMI/ONWI-531). These volumes discuss the methodology and logic used as well as the results that narrowed these sites. Each of the 10 site performance criteria was divided into descriptors related to site performance characteristics. Each descriptor was evaluated by a systematic logic to determine if it could be used as a discriminator. Then more- and less-preferred areas for groups of discriminators were defined and composite maps were prepared and evaluated to identify the sites

  8. Identification of sites within the Palo Duro Basin. Volume 2. Palo Duro Location B

    International Nuclear Information System (INIS)

    1984-11-01

    This three-volume document narrows to two sites for continued investigations for potential nuclear waste repository sites in the Palo Duro Basin of the Texas Panhandle. Volume 1 narrows a site previously identified in Deaf Smith County, Texas; Volume 2 narrows a site previously identified in Swisher County, Texas; and Volume 3 contains responses to comments received regarding the drafts of Volumes 1 and 2 (BMI/ONWI-531). These volumes discuss the methodology and logic used as well as the results that narrowed these sites. Each of the 10 site performance criteria was divided into descriptors related to site performance characteristics. Each descriptor was evaluated by a systematic logic to determine if it could be used as a discriminator. Then more- and less-preferred areas for groups of discriminators were defined and composite maps were prepared and evaluated to identify the sites

  9. Report on the Fourth Reactor Refueling. Laguna Verde Nuclear Central. Unit 1. April-May 1995; Informe de la Cuarta Recarga de Combustible. Central Laguna Verde. Unidad 1. Abril-Mayo 1995

    Energy Technology Data Exchange (ETDEWEB)

    Mendoza L, A; Flores C, E; Lopez G, C P.F.

    1996-12-31

    The fourth refueling of the Unit 1 of Laguna Verde Nuclear Central was executed in the period of April 17 to May 31 of 1995 with the participation of a task group of 358 persons, included technicians and radiation protection officials and auxiliaries.The radiation monitoring and radiological surveillance to the workers was present length ways the refueling process and always attached to the ALARA criteria. The check points for radiation levels were set at: primary container or dry well, reloading floor, decontamination room (level 10.5), turbine building and radioactive waste building. To take advantage of the refueling process, rooms 203 and 213 of the turbine buildings were subject to inspection and maintenance work in valves, heaters and drains of heaters. Management aspects as personnel selection and training, costs, and countable are also presented in this report. Owing to the high cost of man-hour of the members of the ININ staff, its participation in the refueling process was in smaller number than years before. (Author).

  10. Simulation of the steady state of the Laguna Verde Nuclear power station at full power (1931 MWt and 2027 Mwt) with the SCDAPSIM code

    International Nuclear Information System (INIS)

    Amador G, R.; Nunez C, A.; Mateos, E. del A.

    2001-01-01

    This document describes two models developed for the Laguna Verde Nuclear Power Station (LVNPP) using SCDAPSIM computer code. These models represent the LVNPP in normal operation with a nominal power of 1931 MWt and power uprate conditions of 2027 MWt. The steady states obtained by means of these models comply with the criteria established by the ANSI/ANS-3.5-1985 for nuclear power plant simulators. This criteria has been applied to the models of the LVNPP developed by CNSNS in want of some international accepted criteria for ''Best Estimation'' computer codes. These models will be the bases to carry out studies of validation of the own models as well as the analysis of diverse scenarios that evolve to a severe accident. (Author)

  11. Evaluation of the integrity and duration of the Laguna Verde nuclear power plant life- Plant Life Management program (PLIM). TC MEX 04/53 Technical Cooperation Project

    International Nuclear Information System (INIS)

    Arganis J, C.R.; Diaz S, A.; Aguilar T, J.A.

    2006-01-01

    As part of the IAEA TC MEX 04/53 Project 'Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant Handling Program of plant' whose objective is the one of beginning the actions to apply the methodology of Handling of plant life in the Unit 1 of the Laguna Verde Nucleo electric Central for to obtain the Renovation of License in 2020 the ININ, through the Department of Synthesis and Characterization of materials has carried out more of 20 analysis of susceptibility to the intergranular cracking for corrosion under effort in interns so much of the reactor of the unit 1 like of the unit 2 documenting the current state of components based on the type or types of materials that conform them, to it thermomechanical history, operational and of production, as well as of the particularities associated to its use and operation. For the application of the methodology of life handling of plant 5 structure systems or pilot components were selected, to carry out the programs of handling of the aging and handling of plant life: The encircling of the reactor core (Core Shroud), the reactor pressure vessel (Reactor Pressure Vessel), the primary container (Primary Containment), the recirculation system of feeding water (Reactor Feed Water) and cables. (Author)

  12. Analysis of the documents about the core envelopment of nuclear reactor at the Laguna Verde U-1 power plant; Analisis de documentos de los materiales de la envolvente del nucleo del reactor nuclear de la CLV U-1

    Energy Technology Data Exchange (ETDEWEB)

    Zamora R, L.; Medina F, A. [Instituto Nacional de Investigaciones Nucleares, A.P. 18-1027, 11801 Mexico D.F. (Mexico)

    1999-07-01

    The degradation of internal components at BWR type reactors is an important subject to consider in the performance availability of the power plant. The Wuergassen nuclear reactor license was confiscated due to the presence of cracking in the core envelopment. In consequence it is necessary carrying out a detailed study with the purpose to avoid these problems in the future. This report presents a review and analysis of documents and technical information referring to the core envelopment of a BWR/5/6 and the Laguna Verde Unit 1 nuclear reactor in Mexico. In this document are presented design data, documents about fabrication processes, and manufacturing of core envelopment. (Author)

  13. Toimitila-, palo- ja pelastusturvallisuus majoitusyrityksessä

    OpenAIRE

    Pajunen, Touko

    2010-01-01

    Opinnäytetyö tehtiin erään Etelä-Savossa sijaitsevan hotellin hotellipäällikön toimeksiannosta. Työn tavoitteena oli kerätä tietoperusta toimitila-, palo- ja pelastusturvallisuudesta, ja laatia sen pohjalta turvallisuuskatsaus kyseisessä hotellissa. Turvallisuuskatsauksen tavoitteena oli nostaa esiin mahdollisia toimitila-, palo- ja pelastusturvallisuuteen liittyviä epäkohtia ja ehdottaa niihin ratkaisuja. Turvallisuuskatsaus koostui kahdesta tutkimuksesta. Ensimmäisessä arvioitiin toimit...

  14. Geology and geohydrology of the Palo Duro Basin, Texas Panhandle. A report on the progress of nuclear isolation feasibility studies, 1980. Annual report, October 1, 1979-September 30, 1980

    International Nuclear Information System (INIS)

    Gustavson, T.C.; Bassett, R.L.; Finley, R.J.

    1981-01-01

    Since early 1977, the Bureau of Economic Geology has been evaluating several salt-bearing basins within the State of Texas as part of the national nuclear repository program. The Bureau, a research unit of the University of Texas and the State of Texas, is conducting a long-term program to gather and interpret all geologic and hydrologic information necessary for description, delineation, and evaluation of salt-bearing and related strata in the Palo Duro and Dalhart Basins of the Texas Panhandle. The program in FY 1980 was divided into five broad research tasks, which were addressed by a surficial analysis and shallow stratigraphy group, a hydrology and geochemistry group, a basin analysis group, a host-rock analysis group, and a seismicity and tectonic environment group. The surficial analysis and shallow stratigraphy group has collected remotely sensed, surface and subsurface data to describe land resources, surface processes, and rates and styles of geomorphic development. The hydrology and geochemistry group has continued analysis of shallow and deep fluid circulation within the basins and has initiated studies of rock and fluid geochemistry within the salt-bearing units. The basin analysis group has characterized the major salt-bearing stratigraphic units within the basins and has assessed the potential for generating and trapping hydrocarbons within the basins. Concurrently, the host-rock analysis group has continued a study of cores from two drilling sites for analysis of salt and other lithologic units within the cores. The newly formed seismicity and tectonic environment group has initiated studies of deep-basement structure and tetonic development of the basin and has made an analysis of surface fracture systems. This paper, a summary of progress during FY 1980, presents principal conclusions and reviews methods used and types of data and maps generated

  15. Revision of documents guide to obtain the renovation of licence of the nuclear power plant of Laguna Verde, Units I and II; Revision de documentos guia para obtener la renovacion de licencia de la Central Nuclear Laguna Verde Unidades 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Jarvio C, G. [ININ 52750 La Marquesa, Estado de Mexico (Mexico); Fernandez S, G. [CFE, Gerencia de Centrales Nucleoelectricas, Subgerencia de Ingenieria, Carretera Veracruz-Medellin s/n (Km. 7.5), Dos Bocas, 54270 Veracruz (Mexico)]. e-mail: giarvio@yahoo.com.mx

    2008-07-01

    Unquestionably the renovation of license of the nuclear power plants , it this converting in a promising option to be able to gather in sure, reliable form and economic those requests about future energy in the countries with facilities of this type. This work it analyzes four documents guide and their application for the determination of the renovation of it licenses in nuclear plants that will serve of base for their aplication in the Nuclear Power Plant of Laguna Verde Units I and 2. The four documents in question are: the one Inform Generic of Learned Lessons on the Aging (NUREG - 1801), the Standard Revision Plan for the Renovation of License (NUREG - 1800), the Regulatory Guide for Renovation of License (GR-1.188), and the NEI 95-10, developed by the Institute of Nuclear Energy that is an Industrial Guide to Implement the Requirements of the 1OCFR Part 54-the Rule of Renovation of It licenses. (Author)

  16. Analysis of the micro-structural damages by neutronic irradiation of the steel of reactor vessels of the nuclear power plant of Laguna Verde. Characterization of the design steel; Analisis de los danos micro-estructurales por irradiacion neutronica del acero de la vasija de los reactores de la Central Nuclear de Laguna Verde. Caracterizacion del acero de diseno

    Energy Technology Data Exchange (ETDEWEB)

    Moranchel y Rodriguez, M.; Garcia B, A. [IPN, Escuela Superior de Fisica y Matematicas, Departamento de Fisica, Av. Luis Enrique Erro s/n, Unidad Profesional Adolfo Lopez Mateos, Col. Lindavista, 07738 Mexico D. F. (Mexico); Longoria G, L. C., E-mail: mmoranchel@ipn.m [ININ, Direccion de Investigacion Cientifica, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2010-09-15

    The vessel of a nuclear reactor is one of the safety barriers more important in the design, construction and operation of the reactor. If the vessel results affected to the grade of to have fracture and/or cracks it is very probable the conclusion of their useful life in order to guarantee the nuclear safety and the radiological protection of the exposure occupational personnel, of the public and the environment avoiding the exposition to radioactive sources. The materials of the vessel of a nuclear reactor are exposed continually to the neutronic irradiation that generates the same nuclear reactor. The neutrons that impact to the vessel have the sufficient energy to penetrate certain depth in function of the energy of the incident neutron until reaching the repose or to be absorbed by some nucleus. In the course of their penetration, the neutrons interact with the nuclei, atoms, molecules and with the same crystalline nets of the vessel material producing vacuums, interstitial, precipitate and segregations among other defects that can modify the mechanical properties of the steel. The steel A533-B is the material with which is manufactured the vessel of the nuclear reactors of nuclear power plant of Laguna Verde, is an alloy that, among other components, it contains atoms of Ni that if they are segregated by the neutrons impact this would favor to the cracking of the same vessel. This work is part of an investigation to analyze the micro-structural damages of the reactor vessels of the nuclear power plant of Laguna Verde due to the neutronic irradiation which is exposed in a continuous way. We will show the characterization of the design steel of the vessel, what offers a comprehension about their chemical composition, the superficial topography and the crystalline nets of the steel A533-B. It will also allow analyze the existence of precipitates, segregates, the type of crystalline net and the distances inter-plains of the design steel of the vessel. (Author)

  17. The technology transfer and the Laguna Verde power plants

    International Nuclear Information System (INIS)

    Garza, R.F. de La

    1991-01-01

    The process of technology transfer to the construction of Laguna Verde Nuclear Power Plants, Mexico, is described. The options and the efforts for absorbing the technology of Nuclear Power Plant design and construction by the mexican engineers are emphasized. (author)

  18. Identification of sites within the Palo Duro Basin. Volume 3. Responses to comments

    International Nuclear Information System (INIS)

    1984-11-01

    This document responds to comments received by the US Department of Energy (DOE) on the draft report entitled Identification of Sites Within the Palo Duro Basin: Volume I - Palo Duro Location A (in Deaf Smith County) and Volume II - Palo Duro Location B (in Swisher County), BMI/ONWI-531, February 1984. The purpose of the report was to review existing geologic, environmental, and socioeconomic data for previously identified potentially acceptable sites consisting of approximately 200 square miles in Swisher County and 400 square miles in Deaf Smith County in the Texas Panhandle and to narrow them to preferred smaller sites for possible further study for a nuclear waste repository. The smaller sites thus identified within the two counties would then be more comparable in size to those in salt deposits in Louisiana, Mississippi, and Utah

  19. Geology and geohydrology of the Palo Duro Basin, Texas Panhandle. Report on the progress of nuclear waste isolation feasibility studies, 1978

    International Nuclear Information System (INIS)

    Dutton, S.P.; Finley, R.J.; Galloway, W.E.; Gustavson, T.C.; Handford, C.R.; Presley, M.W.

    1979-01-01

    Early in 1977 the Bureau of Economic Geology was invited to assemble and evaluate geologic data on several salt-bearing basins within the State of Texas as a contribution to the national nuclear repository program. In response to this request, the Bureau, acting as a technical research unit of the University of Texas at Austin and the State of Texas, initiated a long-term program to assemble and interpret all geologic and hydrologic information necessary for delineation, description, and evaluation of salt-bearing strata in the Panhandle area. The technical program can be subdivided into three broad research tasks, which are addressed by a basin analysis group, a surface studies group, and a basin geohydrology group. The basin analysis group has assembled the regional stratigraphic and structural framework of the total basin fill, initiated evaluation of natural resources, and selected stratigraphic core sites for sampling the salt and associated beds. Two drilling sites have provided nearly 8000 feet (2400 m) of core material for analysis and testing of the various lithologies overlying and interbedded with salt units. Concurrently, the surface studies group has collected ground and remotely-sensed data to describe surficial processes, including carbonate and evaporate solution, geomorphic evolution, and fracture system development. The newly formed basin geohydrology group will evaluate both shallow and deep circulation of fluids within the basins. This paper, a summary report of progress, reviews principal conclusions and illustrates the methodologies used and the types of data and displays generated

  20. Simulation of the turbine trip of Unit 1 of the Laguna Verde nuclear power plant using the code Simulate-3K

    International Nuclear Information System (INIS)

    Alegria A, A.; Filio L, C.; Ortiz V, J.

    2017-09-01

    In order to compare the results obtained from the model developed in the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) with the code Simulate-3K (S3K) with respect to those reported by the process computer of the Central (SIIP), the simulation of the turbine trip transient was carried out, caused by the firing of the main generator, the low differential pressure of oil of its seals and the automatic Scram of Unit 1 of the Laguna Verde nuclear power plant, at 87% of power nominal during the operation cycle 16. Since the reactor was brought to a safe stop due to Scram, was enough to simulate 20 seconds to observe the maximum increase in pressure with S3K. In this work, the following parameters are shown and compared: the neutron flux, the thermal power, the pressure in the dome, the flow at the entrance to the core, the steam flow that leaves the vessel and the minimal critical power ratio (MCPR). The neutron flux of the average power range monitors of the nuclear power plant was compared with the S3K detectors model. Finally, the MCPR was calculated with a different correlation to that of the fuel supplier and its deviation from its safety limit was determined. In conclusion, the results obtained show the current state of the model for the simulation of reactivity transients and the opportunity areas to consolidate this tool in support of the process of licensing refueling in the CNSNS. (Author)

  1. The National Institute of Nuclear Research (ININ) and its participation in the External Radiological Emergency Plans at Laguna Verde Power plant; El ININ y su participacion en el Plan de Emergencia Radiologica Externo de la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Suarez, G. [Instituto Nacional de Investigaciones Nucleares, Departamento de Proteccion Radiologica, A.P. 18-1027, 11801 Mexico D.F. (Mexico)

    1998-07-01

    In this article it is described the form in which the ININ participates in the External Radiological Emergency Plan at Laguna Verde Power plant. It is set the objective, mission and organization of this plan. The responsibilities and activities that plan has assigned are mentioned also the organization to fulfil them and the obtained results during 9 years of participation. (Author)

  2. Evaluation of the integrity and duration of the Laguna Verde nuclear power plant life- Plant Life Management program (PLIM). TC MEX 04/53 Technical Cooperation Project; Evaluacion de la integridad y extension de vida de la planta de potencia nuclear Laguna Verde- Programa de manejo de vida de planta (PLIM). Proyecto de cooperacion tecnica TC MEX 04/53

    Energy Technology Data Exchange (ETDEWEB)

    Arganis J, C.R.; Diaz S, A.; Aguilar T, J.A. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    2006-07-01

    As part of the IAEA TC MEX 04/53 Project 'Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant Handling Program of plant' whose objective is the one of beginning the actions to apply the methodology of Handling of plant life in the Unit 1 of the Laguna Verde Nucleo electric Central for to obtain the Renovation of License in 2020 the ININ, through the Department of Synthesis and Characterization of materials has carried out more of 20 analysis of susceptibility to the intergranular cracking for corrosion under effort in interns so much of the reactor of the unit 1 like of the unit 2 documenting the current state of components based on the type or types of materials that conform them, to it thermomechanical history, operational and of production, as well as of the particularities associated to its use and operation. For the application of the methodology of life handling of plant 5 structure systems or pilot components were selected, to carry out the programs of handling of the aging and handling of plant life: The encircling of the reactor core (Core Shroud), the reactor pressure vessel (Reactor Pressure Vessel), the primary container (Primary Containment), the recirculation system of feeding water (Reactor Feed Water) and cables. (Author)

  3. Impact on the bar value in hot by the introduction of advanced control bars in the Unit 1 of the Laguna Verde Nuclear power plant

    International Nuclear Information System (INIS)

    Montes, J.L.; Perusquia, R.; Ortiz, J.J.; Hernandez, J.L.; Ramirez, J.R.

    2004-01-01

    In recent dates the Laguna Verde Nuclear Power station (CNLV) has acquired new designs of control bars, this new type of bars presents modifications important in their design. For what is important to analyze their performance inside those reactors of this nuclear power station. Presently work is shown the behavior of the nucleus of the reactor in hot condition (HFP) when three different types of control bar are used. The first of them corresponds the one that initially has been used in this power station and that we will call original. The second type of control bars, it corresponds to an advanced type and it is the first design different from the original and it corresponds to a bar design that it includes Hafnium (Hf) like one of their neutronic absorption characteristics. The third, denoted as 2AV, include besides the material of the second type new design characteristics, and it is the last finish bar type that it has been introduced in the operation of the reactors of the CNLV. With base in the studied cases is found that the bars 2AV have a total power value, 7.6 % bigger respect the bars 1AV; and in turn the bars 1AV, 6.1 % bigger with respect the ORG control bars. (Author)

  4. Scenarios simulation of severe accident type small loss of coolant (Loca), with the code MELCOR version 2.1 for the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Cardenas V, J.; Mugica R, C. A.; Godinez S, V.

    2013-10-01

    In this work was carried out the analysis of two scenarios of the accident type with loss of coolant in a recirculation loop for a break with smaller ares to 0.1 ft 2 (4.6 cm 2 ), which is classified according to their size like small Loca. The first simulated scenario was a small Loca without action of the emergency coolant injection systems, and the second was a small Loca with only the available system LPCS. This design base accident was taken into account for its relevance with regard to the damage to the core and the hydrogen generation. Was also observed and analyzed the response of the action of the ECCS that depend of the loss of coolant reason and this in turn depends of the size and type of the pipe break. The specified scenarios were simulated by means of the use of MELCOR model for the nuclear power plant of Laguna Verde that has the Comision Nacional de Seguridad Nuclear y Salvaguardias. (Author)

  5. Safety evaluation report related to the operation of Palo Verde Nuclear Generating Station, Units, 1, 2, and 3: Docket Nos. STN 50-528, STN 50-529, and STN 50-530

    International Nuclear Information System (INIS)

    1983-03-01

    Information is presented concerning site characteristics; mechanical systems and components; reactor coolant system; engineered safety systems; reactor instrumentation; reactor operations; and quality assurance

  6. Safety evaluation report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3: Docket Nos. STN 50-528, STN 50-529, and STN 50-530

    International Nuclear Information System (INIS)

    1982-09-01

    Additional information is presented concerning site characteristics; inservice testing of pumps and valves; reactor coolant system; engineered safety systems; electric power systems; auxiliary systems; and quality assurance

  7. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530). Supplement No. 8

    International Nuclear Information System (INIS)

    1985-05-01

    Purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of additional information submitted by the applicant since Supplement No. 7 was issued and matters that the staff had under review when Supplement No. 7 was issued, specifically those issues which required resolution prior to plant operation of Unit 1 above 5% full power

  8. Quality studies of the energy in the electric net of the gathering warehouse of reusable parts and contaminate oils of the nuclear power plant Laguna Verde

    International Nuclear Information System (INIS)

    Tijerina S, F.; Vargas A, A.; Cardenas J, J.

    2012-10-01

    In the industry exist the high costs by faults of electronic and electric equipment s, due to during the design process, installation, tests and operation of these equipment s, is not had appropriate detection equipment to carry out quality studies of the energy. These studies give an important support to know that occurs in an electric net, the cause of the anomalous behavior of the equipment s and this way to avoid the expensive faults carrying out necessary engineering adaptations in an electric net. The elements of the electricity that are determined are the tension, current and frequency that are inside acceptable operational parameters that facilitate the operation and constant operation of the equipment s, free of interruptions and failures. The application of the quality studies of the energy is growing little by little in Mexico for the problems solution in the equipment s. This field is also developing new techniques and technologies integrated in the equipment s for its monitoring detection and protection. The present work offers the results of the first Quality Study of the Energy in the nuclear power plant of Laguna Verde to solve the problem in the gathering warehouse of reusable parts and contaminate oils, in which the failure of the two radiation monitors of the gassy effluent of ventilation HVAC of the warehouse took place. (Author)

  9. Validation of a new version of software for monitoring the core of nuclear power plant of Laguna Verde Unit 2, at the end of Cycle 10; Validacion de una nueva version del software para monitoreo del nucleo de la Central Laguna Verde Unidad 2, al final del Ciclo 10

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez, G.; Calleros, G.; Mata, F. [Comision Federal de Electricidad, Central Nucleoelectrica de Laguna Verde, Carretera Cardel-Nautla Km 42.5, Veracruz (Mexico)], e-mail: gabriel.hernandez05@cfe.gob.mx

    2009-10-15

    This work shows the differences observed in thermal limits established in the technical specifications of operation, among the new software, installed at the end of Cycle 10 of Unit 2 of nuclear power plant of Laguna Verde, and the old software that was installed from the beginning of the cycle. The methodology allowed to validate the new software during the coast down stage, before finishing the cycle, for what could be used as tool during the shutdown of Unit 2 at the end of Cycle 10. (Author)

  10. Laguna Verde - A photo story

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-04-15

    Safety is one of the main factors in the construction and operation of a modern nuclear power plant. There are many barriers between the fission products produced in the fuel elements of the core, and the environment: the cladding of the fuel pins which are enclosed in the reactor core, the pressure vessel containing the core and which in turn is enclosed in the reactor containment, all this being located in a low-pressure secondary containment or reactor building. Despite these precautions, nuclear safety is still a widely-discussed issue. The important fact remains, however, that there has not been a single radiation-induced fatality or serious injury at any civilian nuclear power plant during 20 years of nuclear power generation. This includes the accident that occurred in March 1979 at the Three Mile Island nuclear plant in the USA. A substantial component contributing to safety in a nuclear power plant is the containment. The following photos of Laguna Verde, Mexico's first nuclear power station being constructed at Alta Lucero in Vera Cruz, give an impression of how strong this concrete and steel containment actually is. Laguna Verde consists of two 600 MWe units and the plant is scheduled for commercial operation in 1982. Construction began in 1974. Both units are boiling-water reactors. The photos show, in general, the construction of the primary containment for the reactors (the dry wells). The dry well contains the reactor itself and has two layers: the leak-tight steel liner and the heavy concrete building. The purpose of the primary containment is to retain steam and gases that might escape in an emergency and to direct these through relief tubes to a water pond for cooling. Surrounding this primary containment will be a reactor building which serves as a secondary low-pressure containment, able to operate at pressures up to 0.2 atmospheres.

  11. Simulation of the turbine trip of Unit 1 of the Laguna Verde nuclear power plant using the code Simulate-3K; Simulacion del disparo de turbina de la Unidad 1 de la central nuclear Laguna Verde empleando el codigo Simulate-3K

    Energy Technology Data Exchange (ETDEWEB)

    Alegria A, A. [Comision Nacional de Seguridad Nuclear y Salvaguardias, Dr. Barragan 779, Col. Narvarte, 03020 Ciudad de Mexico (Mexico); Filio L, C. [IPN, Escuela Superior de Fisica y Matematicas, Av. IPN s/n, 07738 Ciudad de Mexico (Mexico); Ortiz V, J., E-mail: aalegria@cnsns.gob.mx [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2017-09-15

    In order to compare the results obtained from the model developed in the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) with the code Simulate-3K (S3K) with respect to those reported by the process computer of the Central (SIIP), the simulation of the turbine trip transient was carried out, caused by the firing of the main generator, the low differential pressure of oil of its seals and the automatic Scram of Unit 1 of the Laguna Verde nuclear power plant, at 87% of power nominal during the operation cycle 16. Since the reactor was brought to a safe stop due to Scram, was enough to simulate 20 seconds to observe the maximum increase in pressure with S3K. In this work, the following parameters are shown and compared: the neutron flux, the thermal power, the pressure in the dome, the flow at the entrance to the core, the steam flow that leaves the vessel and the minimal critical power ratio (MCPR). The neutron flux of the average power range monitors of the nuclear power plant was compared with the S3K detectors model. Finally, the MCPR was calculated with a different correlation to that of the fuel supplier and its deviation from its safety limit was determined. In conclusion, the results obtained show the current state of the model for the simulation of reactivity transients and the opportunity areas to consolidate this tool in support of the process of licensing refueling in the CNSNS. (Author)

  12. Study and characterization of noble metal deposits on similar rusty surfaces to those of the reactor U-1 type BWR of nuclear power station of Laguna Verde; Estudio y caracterizacion de depositos de metales nobles sobre superficies oxidadas similares a las del reactor de la Central de Laguna Verde (CNLV) U1 del tipo BWR

    Energy Technology Data Exchange (ETDEWEB)

    Flores S, V. H.

    2011-07-01

    In the present investigation work, were determined the parameters to simulate the conditions of internal oxidation reactor circulation pipes of the nuclear power plant of Laguna Verde in Veracruz. We used 304l stainless steel cylinders with two faces prepared with abrasive paper of No. 600, with the finality to obtain similar surface to the internal circulation piping nuclear reactor. Oxides was formed within an autoclave (Autoclave MEX-02 unit B), which is a device that simulates the working conditions of the nuclear reactor, but without radiation generated by the fission reaction within the reactor. The oxidation conditions were a temperature of 280 C and pressure of 8 MPa, similar conditions to the reactor operating in nuclear power plant of Laguna Verde in Veracruz, Mexico (BWR conditions), with an average conductivity of 4.58 ms / cm and 2352 ppb oxygen to simulate normal water chemistry NWC. Were obtained deposits of noble metal oxides formed on 304l stainless steel samples, in a 250 ml autoclave at a temperature range of 180 to 200 C. The elements that were used to deposit platinum-rhodium (Pt-Rh) with aqueous Na{sub 2}Pt (OH){sub 6} and Na{sub 3}Rh (NO{sub 2}){sub 6}, Silver (Ag) with an aqueous solution of AgNO{sub 3}, zirconium (Zr) with aqueous Zr O (NO{sub 3}) and ZrO{sub 2}, and zinc (Zn) in aqueous solution of Zn (NO{sub 3}){sub 2} under conditions of normal water chemistry. Also there was the oxidation of 304l stainless steel specimens in normal water chemistry with a solution of Zinc (Zn) (NWC + Zn). Oxidation of the specimens in water chemistry with a solution of zinc (Zn + NWC) was prepared in two ways: within the MEX-02 autoclave unit A in a solution of zinc and a flask at constant temperature in zinc solution. The oxides formed and deposits were characterized by scanning electron microscopy, energy dispersive X-ray analysis, elemental field analysis and X-ray diffraction. By other hand was evaluated the electrochemical behavior of the oxides

  13. First fuel reload in Laguna Verde

    International Nuclear Information System (INIS)

    Bahena B, D.

    1992-01-01

    A report containing the activities carried out during the first reload of nuclear fuel and major maintenance in the Laguna Verde nuclear reactor is presented. The previous and the specific activities are included. These last are related without including the technical considerations, data or the operation details, because these data were documented inside the registrations of the CFE, the ININ and in personal way. (Author)

  14. Cabo Verde - Private Sector Development

    Data.gov (United States)

    Millennium Challenge Corporation — The objective of the Private Sector Development Project activities of the 2005-2010 Cabo Verde Compact was to support Cabo Verde's long-term economic transformation...

  15. Ultrasonic meters in the feedwater flow to recover thermal power in the reactor of nuclear power plant of Laguna Verde U1 and U2

    International Nuclear Information System (INIS)

    Tijerina S, F.

    2008-01-01

    The engineers in nuclear power plants BWRs and PWRs based on the development of the ultrasonic technology for the measurement of the mass, volumetric flow, density and temperature in fluids, have applied this technology in two primary targets approved by the NRC: the use for the recovery of thermal power in the reactor and/or to be able to realize an increase of thermal power licensed in a 2% (MUR) by 1OCFR50 Appendix K. The present article mentions the current problem in the measurement of the feedwater flow with Venturi meters, which affects that the thermal balance of reactor BWRs or PWRs this underestimated. One in broad strokes describes the application of the ultrasonic technology for the ultrasonic measurement in the flow of the feedwater system of the reactor and power to recover thermal power of the reactor. One is to the methodology developed in CFE for a calibration of the temperature transmitters of RTD's and the methodology for a calibration of the venturi flow transmitters using ultrasonic measurement. Are show the measurements in the feedwater of reactor of the temperature with RTD's and ultrasonic measurement, as well as the flow with the venturi and the ultrasonic measurement operating the reactor to the 100% of nominal thermal power, before and after the calibration of the temperature transmitters and flow. Finally, is a plan to be able to realize a recovery of thermal power of the reactor, showing as carrying out their estimations. As a result of the application of ultrasonic technology in the feedwater of reactor BWR-5 in Laguna Verde, in the Unit 1 cycle 13 it was recover an equivalent energy to a thermal power of 25 MWt in the reactor and an exit electrical power of 6 M We in the turbogenerator. Also in the Unit 2 cycle 10 it was recover an equivalent energy to a thermal power of 40 MWt in the reactor and an exit electrical power of 16 M We in the turbogenerator. (Author)

  16. Closure simulation of the MSIV of Unit 1 of the Laguna Verde nuclear power plant using the Simulate 3K code

    International Nuclear Information System (INIS)

    Alegria A, A.

    2015-09-01

    In this paper the simulation of closure transient of all main steam isolation valves (MSIV) was performed with the Simulate-3K (S-3K) code for the Unit 1 of the Laguna Verde nuclear power plant (NPP-LV), which operates to thermal power of 2317 MWt, corresponding to the cycle 15 of operation. The set points for the performance of systems correspond to those set out in transient analysis: 3 seconds for the closure of all MSIV; the start of Scram when 121% of the neutron flux is reached, respect from baseline before the transient; the opening by peer of safety relief valves (SRV) in relief mode when the set point of the pressure is reached, the shoot of the feedwater flow seconds after the start of closing of the MSIV and the shoot of the recirculation water pumps when the pressure is reached in the dome of 1048 psig. The simulation time was of 57 seconds, with the top 50 to reach the steady state, from which the closure of all MSIV starts. In this paper the behavior of the pressure in the dome are analyzed, thermal power, neutron flux, the collapsed water level, the flow at the entrance of core, the steam flow coming out of vessel and the flow through of the SRV; the fuel temperature, the minimal critical power ratio, the readings in the instrumentation systems and reactivities. Instrumentation systems were implemented to analyze the neutron flux, these consist of 96 local power range monitors (LPRM) located in different radial and axial positions of the core and 4 channels of average power range monitors, which grouped at 24 LPRM each one. LPRM response to the change of neutron flux in the center of the core, at different axial positions is also shown. Finally, the results show that the safety limit MCPR is not exceeded. (Author)

  17. Proposal of the visual inspection of the integrity of the storage cells of spent fuel from the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Gonzalez M, J. L.; Rivero G, T.; Merino C, F. J.; Santander C, L. E.

    2015-09-01

    As part of the evaluation of the structural integrity of the components of nuclear plants, particularly those applying for life extension is necessary to carry out inspections and nondestructive testing to determine the state meet. In many cases these activities are carried out in areas with high levels of radiation and contamination difficult to access, so that are required to use equipment or robotic systems operated remotely. Among others, the frames and cells of the storage pools for spent fuel are structures subject to a program of tests and inspections, and become relevant because the nuclear power plant of Laguna Verde (NPP-LV) is processing the license to extend the operational life of its reactors. Of non-destructive testing can be used to verify the physical condition of the frames and storage cells, is the remote visual inspection which is a test that allows determine the physical integrity of the components by one or more video cameras designed to applications in underwater environments with radiation, and are used to identify and locate adverse conditions such as ampoules, protuberances, pitting, cracks, stains or buckling, which could affect the three main functions for which the store components are designed: to maintain the physical integrity of spent fuels, store them properly guaranteeing their free insertion and removal, and ensure that the store as a whole meets the criticality criteria that k eff is less than 0.95 throughout the life of the plant. This paper describes a proposal to carry out the visual inspection of the storage cells of spent fuel from the NPP-LV using a probe including one or more video cameras along with your recorder, and its corresponding control program. It is noted that due to the obtained results, the nuclear power plant personnel can make decisions regarding remedial actions or applying complementary methods to verify that the cells and frames have not lost their physical integrity, or in particular that the cover

  18. Simulation of the steady state of the Laguna Verde Nuclear power station at full power (1931 MWt and 2027 Mwt) with the SCDAPSIM code; Simulacion del estado estacionario de la Central Nucleoelectrica de Laguna Verde a plena potencia (1931 MWt y 2027 MWt) con el codigo SCDAPSIM

    Energy Technology Data Exchange (ETDEWEB)

    Amador G, R.; Nunez C, A.; Mateos, E. del A. [Comision Nacional de Seguridad Nuclear y Salvaguardias, Mexico D.F. (Mexico)

    2001-07-01

    This document describes two models developed for the Laguna Verde Nuclear Power Station (LVNPP) using SCDAPSIM computer code. These models represent the LVNPP in normal operation with a nominal power of 1931 MWt and power uprate conditions of 2027 MWt. The steady states obtained by means of these models comply with the criteria established by the ANSI/ANS-3.5-1985 for nuclear power plant simulators. This criteria has been applied to the models of the LVNPP developed by CNSNS in want of some international accepted criteria for ''Best Estimation'' computer codes. These models will be the bases to carry out studies of validation of the own models as well as the analysis of diverse scenarios that evolve to a severe accident. (Author)

  19. Analysis of the micro-structural damages by neutronic irradiation of the steel of reactor vessels of the nuclear power plant of Laguna Verde. Characterization of the design steel

    International Nuclear Information System (INIS)

    Moranchel y Rodriguez, M.; Garcia B, A.; Longoria G, L. C.

    2010-09-01

    The vessel of a nuclear reactor is one of the safety barriers more important in the design, construction and operation of the reactor. If the vessel results affected to the grade of to have fracture and/or cracks it is very probable the conclusion of their useful life in order to guarantee the nuclear safety and the radiological protection of the exposure occupational personnel, of the public and the environment avoiding the exposition to radioactive sources. The materials of the vessel of a nuclear reactor are exposed continually to the neutronic irradiation that generates the same nuclear reactor. The neutrons that impact to the vessel have the sufficient energy to penetrate certain depth in function of the energy of the incident neutron until reaching the repose or to be absorbed by some nucleus. In the course of their penetration, the neutrons interact with the nuclei, atoms, molecules and with the same crystalline nets of the vessel material producing vacuums, interstitial, precipitate and segregations among other defects that can modify the mechanical properties of the steel. The steel A533-B is the material with which is manufactured the vessel of the nuclear reactors of nuclear power plant of Laguna Verde, is an alloy that, among other components, it contains atoms of Ni that if they are segregated by the neutrons impact this would favor to the cracking of the same vessel. This work is part of an investigation to analyze the micro-structural damages of the reactor vessels of the nuclear power plant of Laguna Verde due to the neutronic irradiation which is exposed in a continuous way. We will show the characterization of the design steel of the vessel, what offers a comprehension about their chemical composition, the superficial topography and the crystalline nets of the steel A533-B. It will also allow analyze the existence of precipitates, segregates, the type of crystalline net and the distances inter-plains of the design steel of the vessel. (Author)

  20. Analysis of the noise of the jet pumps of the Unit 2 of the Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Castillo D, R.; Ortiz V, J.; Ruiz E, J.A.; Calleros M, G.

    2004-01-01

    The use of the analysis of noise for the detection of badly functioning of the components of a BWR it is a powerful tool in the determination of abnormal conditions of operation, during the life of a nuclear plant of power. From the eighties, some nuclear reactors have presented problems related with the jet pumps and the knots of the recirculation. The Regulatory Commission of the United States, in the I E bulletin 80-07, recommended to carry out a periodic supervision of the pressure drop of the jet pumps, to prevent structural failures. In this work, methods of analysis of noise are used for the detection of abnormal conditions of operation of the jet pumps of a BWR. Signals are analysed to low and high frequency of pressure drop with the NOISE software that is in development. The obtained results show the behavior of the jet pumps of jet 6 and 11 before and after a partial blockade in their throats where the pump 6 return to their condition of previous operation and the pump 11 present a new fall of pressure, inside the limit them permissible of operation. The methodology of the analysis of noise demonstrated to be an useful tool for the badly functioning detection, and you could apply to create a database to supervise the dynamic behavior of the jet pumps of an BWR. (Author)

  1. The National Institute of Nuclear Research (ININ) and its participation in the External Radiological Emergency Plans at Laguna Verde Power plant

    International Nuclear Information System (INIS)

    Suarez, G.

    1998-01-01

    In this article it is described the form in which the ININ participates in the External Radiological Emergency Plan at Laguna Verde Power plant. It is set the objective, mission and organization of this plan. The responsibilities and activities that plan has assigned are mentioned also the organization to fulfil them and the obtained results during 9 years of participation. (Author)

  2. Geotechnical materials considerations for conceptual repository design in the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Versluis, W.S.; Balderman, M.A.

    1984-01-01

    The Palo Duro Basin is only one of numerous potential repository locations for placement of a nuclear waste repository. Conceptual designs in the Palo Duro Basin involve considerations of the character and properties of the geologic materials found on several sites throughout the Basin. The first consideration presented includes current basin exploration results and interpretations of engineering properties for the basin geologic sequences. The next consideration presented includes identification of the characteristics of rock taken from the geologic sequence of interest through laboratory and field testing. Values for materials properties of representative samples are obtained for input into modeling of the material response to repository placement. Conceptual designs which respond to these geotechnical considerations are discussed. 4 references, 4 figures, 4 tables

  3. Area geological characterization report for the Palo Duro and Dalhart Basins, Texas

    International Nuclear Information System (INIS)

    1983-07-01

    The present state of knowledge of the geology, hydrogeology, and seismology of the Palo Duro and Dalhart basins is summarized as a basis for future siting studies for a high-level nuclear waste repository. Large portions of the Texas Panhandle, and especially the Palo Duro basin, have stable geologic conditions and a favorable evaporite stratigraphy that warrant further study. Five salt-bearing formations containing thick salt units are present within the basin. Salt beds appear to be persistent over wide areas, relatively flat lying and structurally undisturbed. Available hydrogeologic data suggest that favorable conditions for waste isolation are widespread. The level and rate of seismic activity are low throughout the Texas Panhandle. 335 references, 83 figures, 17 tables

  4. Experience with the use of programmable logic controllers in nuclear safety applications. Final report

    International Nuclear Information System (INIS)

    Brown, E.M.; Stofko, M.J.

    1995-03-01

    This report describes the implementation and experience with Programmable Logic Controllers (PLC) for nuclear safety applications. Two applications are described. The first is an Anticipated Transient Without Scram (ATWS) mitigation system provided as a Diverse Auxiliary Feedwater Actuation System (DAFAS). It was implemented at Arizona Public Service's Palo Verde Nuclear Generating Station and has been in commercial operation since early 1992. The second system described is an Emergency Diesel Generator Bus Load Sequencer installed at Florida Power and Light's Turkey Point Nuclear Power Plant. This system was installed as part of an upgrade to the emergency power system in 1988. The experience gained in the design, development, implementation and qualification of these systems will be beneficial to utilities that are considering the utilization of PLCs for their plant applications

  5. Quality studies of the energy in the electric net of the gathering warehouse of reusable parts and contaminate oils of the nuclear power plant Laguna Verde; Estudios de calidad de la energia en la red electrica del almacen de acopio de partes reusables y aceites contaminados (CCAC) de la Central Nuclear Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Tijerina S, F.; Vargas A, A.; Cardenas J, J., E-mail: francisco.tijerina@cfe.gob.mx [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Subgerencia de Ingenieria, Carretera Cardel-Nautla Km 42.5, Veracruz (Mexico)

    2012-10-15

    In the industry exist the high costs by faults of electronic and electric equipment s, due to during the design process, installation, tests and operation of these equipment s, is not had appropriate detection equipment to carry out quality studies of the energy. These studies give an important support to know that occurs in an electric net, the cause of the anomalous behavior of the equipment s and this way to avoid the expensive faults carrying out necessary engineering adaptations in an electric net. The elements of the electricity that are determined are the tension, current and frequency that are inside acceptable operational parameters that facilitate the operation and constant operation of the equipment s, free of interruptions and failures. The application of the quality studies of the energy is growing little by little in Mexico for the problems solution in the equipment s. This field is also developing new techniques and technologies integrated in the equipment s for its monitoring detection and protection. The present work offers the results of the first Quality Study of the Energy in the nuclear power plant of Laguna Verde to solve the problem in the gathering warehouse of reusable parts and contaminate oils, in which the failure of the two radiation monitors of the gassy effluent of ventilation HVAC of the warehouse took place. (Author)

  6. SIMPRO, a practical tool for training the staff of Laguna Verde nuclear power plant; El SIMPRO, una herramienta practica para la capacitacion y entrenamiento del personal de la CNLV

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez Valdez, Guillermo Omar; Gomez Camargo, Octavio; Castelo Cuevas, Luis; Vazquez Bustos, Jesus [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2012-06-22

    Laguna Verde Nuclear Power Plant (LVNPP) has implemented a real physical model, which represents several parts of a simplified version of its process. This development has proved to be very useful to improve the compliance with training programs and staff training maintenance in the different disciplines of engineering. Such programs are required by regulations and standards applicable for Nuclear Power Plants (NPP), so that the personnel working in these facilities can be able to respond on time to any contingency that might arise. This paper outlines the creation of the real physical model, how it is integrated and some of the practices that can be performed on this model. [Spanish] La Central Nucleoelectrica de Laguna Verde ha implementado un modelo fisico real que representa varias partes de una version simplificada de su proceso. Este desarrollo ha demostrado ser muy util para mejorar el cumplimiento de programas de adiestramiento, incluidos los del personal de mantenimiento, en diferentes disciplinas de ingenieria. Dichos programas son requeridos por las regulaciones y normas aplicables a las centrales nucleoelectricas, de manera que el personal que trabaja en estas instalaciones pueda ser capaz de responder oportunamente a cualquier contingencia que pudiera surgir. Este articulo describe la creacion del modelo fisico real, como se integra y algunas de las practicas que pueden llevarse a cabo con el.

  7. First fuel reload in Laguna Verde; Primera recarga de combustible en Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Bahena B, D

    1992-01-15

    A report containing the activities carried out during the first reload of nuclear fuel and major maintenance in the Laguna Verde nuclear reactor is presented. The previous and the specific activities are included. These last are related without including the technical considerations, data or the operation details, because these data were documented inside the registrations of the CFE, the ININ and in personal way. (Author)

  8. Toetame lasteaedu ja lasteaia õpetajaid / Urve Palo

    Index Scriptorium Estoniae

    Palo, Urve, 1972-

    2007-01-01

    Ilmunud ka: Põhjarannik, 7. sept. 2007, lk. 2; Severnoje Poberezhje, 7. sept. 2007, lk. 2; Meie Maa, 7. sept. 2007, lk. 2; Kuulutaja, 7. sept. 2007, lk. 4; Koit, 8. sept. 2007, lk. 5; Võrumaa Teataja, 8. sept. 2007, lk. 2; Vooremaa, 8. sept. 2007, lk. 2; Sakala, 11. sept. 2007, lk. 2; Nädaline, 11. sept. 2007, lk. 2; Pärnu Postimees, 12. sept. 2007, lk. 15; Valgamaalane, 13. sept. 2007, lk. 2; Hiiu Leht, 18. sept. 2007, lk. 2; Sõnumitooja, 19. sept. 2007, lk. 2; Maaleht, 20. sept. 2007, lk. 8; Nädalaleht, 7. sept. 2007, lk. 2. Rahvastikuminister Urve Palo kinnitusel eraldab uus valitsus rohkem kui kunagi varem raha uute lasteaedade ehituseks ja vanade renoveerimiseks, oluliseks sammuks on lasteaiaõpetajate palga tõstmine, tähelepanu all on piirkondlike erinevuste vähendamine palgatasemetes ning lasteaiaõpetajate palga viimine põhikooliõpetajate alampalga tasemele

  9. Start-up and operation of Laguna Verde-2

    International Nuclear Information System (INIS)

    Torres Ramirez, J.F.

    1996-01-01

    The 665 MWe Laguna Verde-2 nuclear generating unit was accepted into commercial operation on April 10, 1995. The boiling water reactor plant by General Electric (GE) was first synchronized with the grid on November 11, 1994. Laguna Verde-2 is identical with Laguna Verde-1 on the same site. That unit had gone critical for the first time in November 1988 and had first been synchronized with the power grid on April 13, 1989. Commercial operation of Laguna Verde-1 had been started on July 29, 1990. Mexico's only nuclear power plant had been built 70 km north of Veracruz on the east coast and had been scheduled to start operation in 1976. As the Mexican nuclear power program was reduced, the scheduled commissioning dates suffered more and more delays. In the full of 1987, the investigation by the Operational Safety Review Team (Osart) of the International Atomic Energy Agency (IAEA) had indicated that the safety requirements of installations and equpiment were met, and that the whole plant was well prepared for fueling. In mid-1988, the Mexican Government had issued the permit to fuel the Laguna Verde-1 reactor. The contract to build the two units had been awarded in 1972/73. No other nuclear power plants are currently under construction or in the planning phase in Mexico. (orig.) [de

  10. Rehabilitation and modernization project of units 1 and 2 of Laguna Verde Nuclear Power Plant. A strengthening project to 120%. (2nd phase); Proyecto de rehabilitacion y modernizacion de las Unidades 1and 2 de la CNLV. Un proyecto de reponteciacion al 120% (2ª Fase)

    Energy Technology Data Exchange (ETDEWEB)

    Liebana, B.; Merino, A.; Garcia, J. L.; Gomez, M.; Martinez, I.; Ruiz, L.

    2010-07-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This article presents the work of the second phase.

  11. Experiences with the technical cooperation project TC MEX 04/53. Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant. Management program of the plant life (PLIM)

    International Nuclear Information System (INIS)

    Arganis J, C.R.; Aguilar T, J.A.; Guevara M, A.; Garcia M, C.; Martinez G, R.R.; Griz C, M.M.; Sanchez M, M.A.; Diaz O, R.C.

    2006-01-01

    In the biennium 2005-2006 the project of technical cooperation with the International Atomic Energy Agency OIEA TC MEX 04/53 'Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant Plant life handling program (PLIM)' was approved, which has as objective the one to begin the actions to apply the methodology of Handling of life of Plant (PLIM) in the Unit I (Ul) of the Laguna Verde Nucleo electric Central (CNLV), in order to obtain the Renovation of License (LR), in a long term (2020). To apply this methodology 5 systems they were selected, structures or components (SEC) to carry out the handling programs of the one aging (AMP), and PLIM which are: The encircling of the reactor core (Core Shroud), the pressure vessel of the reactor (Reactor Pressure Vessel), the one primary container (Primary Containment), the system of feeding water (Reactor Feed Water) and cables, which were not in this work to be of another nature. The report presents the more important aspects considered in these systems for their programs of AMP and PLIM, as like a revision of those selection processes and evaluation (screening and scoping) for the application of PLIM in the systems of the Ul of the CNLV. (Author)

  12. U russkoi molodjozhi jest shans / Urve Palo ; interv. Ilja Gromov

    Index Scriptorium Estoniae

    Palo, Urve, 1972-

    2008-01-01

    Rahvastikuminister Urve Palo selgitab Avatud Ühiskonna Instituudi vene keelt kõnelevate noorte seas läbi viidud uuringu tulemusi. Lisa: Küsitlus: Kas vene keelt kõnelevatel noortel on Eestis hea elada

  13. Closure simulation of the MSIV of Unit 1 of the Laguna Verde nuclear power plant using the Simulate 3K code; Simulacion del cierre de las MSIV de la Unidad 1 de la central nuclear Laguna Verde empleando el codigo Simulate-3K

    Energy Technology Data Exchange (ETDEWEB)

    Alegria A, A., E-mail: aalegria@cnsns.gob.mx [Comision Nacional de Seguridad Nuclear y Salvaguardias, Dr. Barragan 779, Col. Narvarte, 03020 Ciudad de Mexico (Mexico)

    2015-09-15

    In this paper the simulation of closure transient of all main steam isolation valves (MSIV) was performed with the Simulate-3K (S-3K) code for the Unit 1 of the Laguna Verde nuclear power plant (NPP-LV), which operates to thermal power of 2317 MWt, corresponding to the cycle 15 of operation. The set points for the performance of systems correspond to those set out in transient analysis: 3 seconds for the closure of all MSIV; the start of Scram when 121% of the neutron flux is reached, respect from baseline before the transient; the opening by peer of safety relief valves (SRV) in relief mode when the set point of the pressure is reached, the shoot of the feedwater flow seconds after the start of closing of the MSIV and the shoot of the recirculation water pumps when the pressure is reached in the dome of 1048 psig. The simulation time was of 57 seconds, with the top 50 to reach the steady state, from which the closure of all MSIV starts. In this paper the behavior of the pressure in the dome are analyzed, thermal power, neutron flux, the collapsed water level, the flow at the entrance of core, the steam flow coming out of vessel and the flow through of the SRV; the fuel temperature, the minimal critical power ratio, the readings in the instrumentation systems and reactivities. Instrumentation systems were implemented to analyze the neutron flux, these consist of 96 local power range monitors (LPRM) located in different radial and axial positions of the core and 4 channels of average power range monitors, which grouped at 24 LPRM each one. LPRM response to the change of neutron flux in the center of the core, at different axial positions is also shown. Finally, the results show that the safety limit MCPR is not exceeded. (Author)

  14. Experiences with the technical cooperation project TC MEX 04/53. Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant. Management program of the plant life (PLIM); Experiencias con el proyecto de cooperacion tecnica TC MEX 04/53. Evaluacion de la integridad y extension de vida de la planta de potencia nuclear Laguna Verde. Programa de Manejo de vida de planta (PLIM)

    Energy Technology Data Exchange (ETDEWEB)

    Arganis J, C.R.; Aguilar T, J.A. [ININ, 52750 Ocoyoacac, Estado de Mexico (Mexico); Guevara M, A.; Garcia M, C.; Martinez G, R.R.; Griz C, M.M.; Sanchez M, M.A.; Diaz O, R.C. [CFE, Subgerencia de Ingenieria, Carretera Veracruz-Medellin, Km. 7.5 Veracruz (Mexico)]. e-mail: craj@nuclear.inin.mx

    2006-07-01

    In the biennium 2005-2006 the project of technical cooperation with the International Atomic Energy Agency OIEA TC MEX 04/53 'Evaluation of the integrity and extension of life of the Laguna Verde nuclear power plant Plant life handling program (PLIM)' was approved, which has as objective the one to begin the actions to apply the methodology of Handling of life of Plant (PLIM) in the Unit I (Ul) of the Laguna Verde Nucleo electric Central (CNLV), in order to obtain the Renovation of License (LR), in a long term (2020). To apply this methodology 5 systems they were selected, structures or components (SEC) to carry out the handling programs of the one aging (AMP), and PLIM which are: The encircling of the reactor core (Core Shroud), the pressure vessel of the reactor (Reactor Pressure Vessel), the one primary container (Primary Containment), the system of feeding water (Reactor Feed Water) and cables, which were not in this work to be of another nature. The report presents the more important aspects considered in these systems for their programs of AMP and PLIM, as like a revision of those selection processes and evaluation (screening and scoping) for the application of PLIM in the systems of the Ul of the CNLV. (Author)

  15. Scenarios simulation of severe accident type small loss of coolant (Loca), with the code MELCOR version 2.1 for the nuclear power plant of Laguna Verde; Simulacion de escenarios de accidente severo tipo perdida de refrigerante (Loca) pequeno, con el codigo MELCOR version 2.1 para la central nucleo-electrica de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Cardenas V, J.; Mugica R, C. A.; Godinez S, V., E-mail: Jaime.cardenas@cnsns.gob.mx [Comision Nacional de Seguridad Nuclear y Salvaguardias, Dr. Jose Ma. Barragan No. 779, Col. Narvarte, 03020 Mexico D. F. (Mexico)

    2013-10-15

    In this work was carried out the analysis of two scenarios of the accident type with loss of coolant in a recirculation loop for a break with smaller ares to 0.1 ft{sup 2} (4.6 cm{sup 2}), which is classified according to their size like small Loca. The first simulated scenario was a small Loca without action of the emergency coolant injection systems, and the second was a small Loca with only the available system LPCS. This design base accident was taken into account for its relevance with regard to the damage to the core and the hydrogen generation. Was also observed and analyzed the response of the action of the ECCS that depend of the loss of coolant reason and this in turn depends of the size and type of the pipe break. The specified scenarios were simulated by means of the use of MELCOR model for the nuclear power plant of Laguna Verde that has the Comision Nacional de Seguridad Nuclear y Salvaguardias. (Author)

  16. Development of the stationary state and simulation of an accident severe stage type station blackout with the MELCOR code version 1.8.6 for the nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Mugica R, C. A.; Godinez S, V.

    2011-11-01

    Considering the events happened since the 11 March of 2011, in Japan, where an earthquake of 9.1 grades Ritcher of intensity and a later tsunami impacted in an important way the operation of a nuclear power plant located in the Fukushima, Japan; damaging and disabling their cooling systems and injection of emergency water due to the total loss of electric power (commonly denominated Station Blackout), is eminent the analysis of this stage type that took to the nuclear power plant to conditions of damage to the core and explosions generation by hydrogen concentrations in the reactor building. In this work an analysis of a stage type station blackout is presented, using the model of the nuclear power plant of Laguna Verde starting of the stationary state. The analysis is carried out using the MELCOR code (Methods for Estimation of Leakages and Consequences of Releases) version 1.8.6 whose purpose is to model the accidents progression for light water reactors. The obtained results are qualitatively similar to the events observed in the Fukushima nuclear power plant even though limitations exist to achieve a precise simulation of the events happened in Japan, such as the information flow of the chronology of the operator actions, as well as of the characteristic design of the power plant, volumes in cavities and rooms, water/cooling inventories, interconnected systems and their own emergency procedures or guides for the administration of severe accidents among others. (Author)

  17. Ultrasonic meters in the feedwater flow to recover thermal power in the reactor of nuclear power plant of Laguna Verde U1 and U2; Medidores ultrasonicos en el flujo de agua de alimentacion para recuperar potencia termica en el reactor de la Central Nuclear Laguna Verde U1 and U2

    Energy Technology Data Exchange (ETDEWEB)

    Tijerina S, F. [CFE, Central Laguna Verde, Km. 42.5 Carretera Cardel-Nautla, Veracruz (Mexico)]. e-mail: francisco.tijerina@cfe.gob.mx

    2008-07-01

    The engineers in nuclear power plants BWRs and PWRs based on the development of the ultrasonic technology for the measurement of the mass, volumetric flow, density and temperature in fluids, have applied this technology in two primary targets approved by the NRC: the use for the recovery of thermal power in the reactor and/or to be able to realize an increase of thermal power licensed in a 2% (MUR) by 1OCFR50 Appendix K. The present article mentions the current problem in the measurement of the feedwater flow with Venturi meters, which affects that the thermal balance of reactor BWRs or PWRs this underestimated. One in broad strokes describes the application of the ultrasonic technology for the ultrasonic measurement in the flow of the feedwater system of the reactor and power to recover thermal power of the reactor. One is to the methodology developed in CFE for a calibration of the temperature transmitters of RTD's and the methodology for a calibration of the venturi flow transmitters using ultrasonic measurement. Are show the measurements in the feedwater of reactor of the temperature with RTD's and ultrasonic measurement, as well as the flow with the venturi and the ultrasonic measurement operating the reactor to the 100% of nominal thermal power, before and after the calibration of the temperature transmitters and flow. Finally, is a plan to be able to realize a recovery of thermal power of the reactor, showing as carrying out their estimations. As a result of the application of ultrasonic technology in the feedwater of reactor BWR-5 in Laguna Verde, in the Unit 1 cycle 13 it was recover an equivalent energy to a thermal power of 25 MWt in the reactor and an exit electrical power of 6 M We in the turbogenerator. Also in the Unit 2 cycle 10 it was recover an equivalent energy to a thermal power of 40 MWt in the reactor and an exit electrical power of 16 M We in the turbogenerator. (Author)

  18. Analysis of the noise of the jet pumps of the Unit 2 of the Laguna Verde nuclear power plant; Analisis de ruido de las bombas de chorro de la Unidad 2 de la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Castillo D, R.; Ortiz V, J.; Ruiz E, J.A. [ININ, A.P. 18-1027, 11801 Mexico D.F. (Mexico); Calleros M, G. [CFE, Central Nucleoelectrica de Laguna Verde, Alto Lucero, Veracruz (Mexico)]. E-mail: rcd@nuclear.inin-mx

    2004-07-01

    The use of the analysis of noise for the detection of badly functioning of the components of a BWR it is a powerful tool in the determination of abnormal conditions of operation, during the life of a nuclear plant of power. From the eighties, some nuclear reactors have presented problems related with the jet pumps and the knots of the recirculation. The Regulatory Commission of the United States, in the I E bulletin 80-07, recommended to carry out a periodic supervision of the pressure drop of the jet pumps, to prevent structural failures. In this work, methods of analysis of noise are used for the detection of abnormal conditions of operation of the jet pumps of a BWR. Signals are analysed to low and high frequency of pressure drop with the NOISE software that is in development. The obtained results show the behavior of the jet pumps of jet 6 and 11 before and after a partial blockade in their throats where the pump 6 return to their condition of previous operation and the pump 11 present a new fall of pressure, inside the limit them permissible of operation. The methodology of the analysis of noise demonstrated to be an useful tool for the badly functioning detection, and you could apply to create a database to supervise the dynamic behavior of the jet pumps of an BWR. (Author)

  19. Licensing process of the digital application: Nuclear measurement analysis and control power range neutron monitor (NUMAC-PRNM) system for their implementation in the Laguna Verde NPP unit 2

    International Nuclear Information System (INIS)

    Ledesma-Carrion, R.; Hernandez-Cortes, A.

    1998-01-01

    This paper describe the licensing process performed by the Mexican Regulatory Commission (CNSNS) for the NUclear Measurement Analysis and Control-Power Range Neutron Monitor (NUMAC-PRNM) system, which sends trip signals to the Reactor Protection System (RPS), and has been implemented in the Laguna Verde Nuclear Power Plant Unit (LVNPP-U2) before its first fuel loading. The review and approval process was performed with the advise role of the United States of America Nuclear Regulatory Commission (USNRC): the regulatory frame applied includes the Code of Federal Regulation, some Regulatory Guides and some Industrial Standards. The evaluation covered topics related with the software, hardware and firmware specifications, design, tests, training, maintenance and operational experience. After the revision of these topics, the NUMAC-PRNM was approved through the CNSNS Safety Evaluation Report (SER) and then installed in the LVNPP-U2. This paper include a description of the regulatory requirements to this digital application, the safety concerns involved, the compliance to these requirements by the utility and the results of the CNSNS evaluation, mentioning the experience acquired during the process and the method used to perform the evaluation. Additionally, the interface between the designer-vendor, the utility and the regulatory body during the licensing process is commented. Finally, the conclusion is presented, taking into account the operational experience of the NUMAC applications implemented in the LVNPP. It also gives the future regulatory tasks related to the assessment of digital performance equipment and upgrades. (author)

  20. Application of new control technology during the maintenance of equipment in the Laguna Verde nuclear power plant; Aplicacion de nueva tecnologia de control durante el mantenimiento de equipos en la CLV

    Energy Technology Data Exchange (ETDEWEB)

    Ojeda R, M. A. [CFE, Central Laguna Verde, Subgerencia General de Operacion, Veracruz (Mexico)]. e-mail: mario.ojeda@cfe.gob.mx

    2008-07-01

    In the nuclear power plant of Laguna Verde, in normal operation and recharges are carried out activities of preventive maintenance and corrective to different equipment, due to the one displacement of radioactive materials from the vessel of the reactor until the one system of vapor, different radiation levels are generated (from low until very high) in the circuits of vapor and water, the particles can be incrusted on those interior surfaces of the pipes and equipment, creating this way a potential risk of contamination and exhibition during the maintenance of equipment. To help to optimize the dose to the personnel the use of new technology the has been implemented which besides contributing an absolute control of the work, it offers bigger comfort to the one worker during the development of their work, also contributing a supervision more effective of the same one. Using the captured and processed information of the work developed you can use for the personnel's capacitation and feedback of the work for the continuous improvement of the same one. During a reduction of programmed power and normal operation are carried out maintenance correctives and specific works to preserve the readiness and ability of the equipment and with this to maintain the security of the nuclear power plant. The development of the theme it is showing the advances and commitments of personnel to take to excellence to the nuclear power plant of Laguna Verde showing to the obtained results of the dose and benefits of 2 works carried out in the nuclear power plant where tools ALARA were applied as well as the use of the new technology (Video Equipment of Tele dosimetry and Audio 'VETA') in works carried out in the building of purification level 10.15, change and cuts of filter of the prefilters of system G16, as well as,the retirement and transfer for its decay of High Integrity Container (HIC) of the building of purification level -0.55 to the Temporary Warehouse in Site

  1. Timo Palo jäine väljakutse

    Index Scriptorium Estoniae

    2014-01-01

    Fotonäitusest "Jäine väljakutse". Näitus koosneb kahest osast: National Geographicu fotograafi Paul Nickleni fotodest "Polar Obsession" ja Eesti polaarränduri Timo Palo retke põhjapooluselt Teravmägede saarestikku kirjeldavast väljapanekust

  2. Petroleum geology of the Palo Duro Basin, Texas Panhandle

    International Nuclear Information System (INIS)

    Rose, P.R.

    1986-03-01

    The Palo Duro Basin, Permian Basin, Texas is an asymmetric, relatively shallow, intracratonic basin in the southern Texas Panhandle filled mostly by Mississippian, Pennsylvanian, and Permian sedimentary rocks. Although deeper and prolific prolific petroleum-producing basins adjoin it on the north (Anadarko Basin), south (Midland Basin), and east (Hardeman Basin), the Palo Duro Basin has produced remarkably small amounts of oil and gas to date. This is all the more noteworthy because the sedimentary sequence and rock types of the basin are similar to those of the adjacent basins. Analyses of the stratigraphic succession and structural configuration of the Palo Duro Basin suggest that adequate reservoir rocks, top-seals, and geologic structures are present. Most of the structures formed early enough to have trapped hydrocarbons if they were migrating in the rock column. Although additional work is under way to properly address the question of the petroleum source rocks, generation, and migration, the general absence of production in the basin may relate to an overall deficiency in hydrocarbon generation within the basin. Geologic information in this report will form part of the basis for further analysis and conclusions on hydrocarbon potential in the Palo Duro Basin

  3. Proposal of the visual inspection of the integrity of the storage cells of spent fuel from the nuclear power plant of Laguna Verde; Propuesta para la inspeccion visual de la integridad de las celdas de almacenamiento de combustible gastado de la Central Laguna Verde (CLV)

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez M, J. L.; Rivero G, T.; Merino C, F. J. [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico); Santander C, L. E., E-mail: francisco.merino@inin.gob.mx [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Carretera Veracruz-Medellin Km 7.5, Col. Dos Bocas, 94271 Medellin, Veracruz (Mexico)

    2015-09-15

    As part of the evaluation of the structural integrity of the components of nuclear plants, particularly those applying for life extension is necessary to carry out inspections and nondestructive testing to determine the state meet. In many cases these activities are carried out in areas with high levels of radiation and contamination difficult to access, so that are required to use equipment or robotic systems operated remotely. Among others, the frames and cells of the storage pools for spent fuel are structures subject to a program of tests and inspections, and become relevant because the nuclear power plant of Laguna Verde (NPP-LV) is processing the license to extend the operational life of its reactors. Of non-destructive testing can be used to verify the physical condition of the frames and storage cells, is the remote visual inspection which is a test that allows determine the physical integrity of the components by one or more video cameras designed to applications in underwater environments with radiation, and are used to identify and locate adverse conditions such as ampoules, protuberances, pitting, cracks, stains or buckling, which could affect the three main functions for which the store components are designed: to maintain the physical integrity of spent fuels, store them properly guaranteeing their free insertion and removal, and ensure that the store as a whole meets the criticality criteria that k{sub eff} is less than 0.95 throughout the life of the plant. This paper describes a proposal to carry out the visual inspection of the storage cells of spent fuel from the NPP-LV using a probe including one or more video cameras along with your recorder, and its corresponding control program. It is noted that due to the obtained results, the nuclear power plant personnel can make decisions regarding remedial actions or applying complementary methods to verify that the cells and frames have not lost their physical integrity, or in particular that the cover

  4. Fuel management inside the reactor. Report of generation of the nuclear bank for the fuel of the initial load of the Laguna Verde U-1 reactor with the FMS codes; Administracion de combustible dentro del reactor. Reporte de generacion del banco nuclear para el combustible de la carga inicial del reactor de Laguna Verde U-1 con los codigos del FMS

    Energy Technology Data Exchange (ETDEWEB)

    Alonso V, G. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico); Torres A, C. [CFE, Veracruz (Mexico)

    1991-06-15

    In this work in a general way the form in that it was generated the database of the initial fuel load of the Laguna Verde Unit 1 reactor is described. The initial load is formed with fuel of the GE6 type. The obtained results during the formation of the database in as much as to the behavior of the different cell parameters regarding the one burnt of the fuel and the variation of vacuums in the coolant channel its are compared very favorably with those reported by the General Electric fuel supplier and reported in the design documents of the same one. (Author)

  5. Santeria and Palo Mayombe: skulls, mercury, and artifacts.

    Science.gov (United States)

    Gill, James R; Rainwater, Christopher W; Adams, Bradley J

    2009-11-01

    Santeria and Palo Mayombe are syncretic religions created in the New World based upon African religious beliefs combined with Christianity. The main worship of Palo Mayombe involves religious receptacles that may contain earth, sticks, varied artifacts, and animal and human remains. Due to the use of human and nonhuman remains, discovery of these items often leads to involvement by the police due to a concern of homicide. We review in detail the medical examiner records of two of these ritualistic cases including the autopsy, anthropology, police, and investigators' reports. For the human remains, careful consideration of the context in which the remains were recovered, their state of preservation, and the associated artifacts (e.g., beads and mercury) are important in determining the appropriate level of forensic significance. Anthropological examination with particular attention to taphonomic characteristics also may help determine the origin and forensic significance.

  6. Pumping test and fluid sampling report - Sawyer No. 1 well, Palo Duro Basin, Texas: unanalyzed data

    International Nuclear Information System (INIS)

    1984-05-01

    This report describes pumping test and fluid sampling activities performed at the Sawyer No. 1 well, Donley County, Texas. Sawyer No. 1 well is located along the eastern margin of the Palo Duro Basin in an area of active dissolution within the Permian salt section. These data were collected by Stone and Webster Engineering Corporation working in conjunction with the Texas Bureau of Economic Geology as part of a nationwide program to identify potential locations for a nuclear waste repository. These data support studies to determine the hydrologic characteristics of deep water-bearing formations. Formation fluid studies samples were analyzed in order to evaluate fluid migration and age relationships in the Permian Basin. These data were collected from June until October, 1981. Zone isolation for pump testing was accomplished in November, 1981. These data are preliminary. They have been neither analyzed nor evaluated

  7. Flooding studies of proposed repository locations in the Palo Duro Basin of the Texas Panhandle

    International Nuclear Information System (INIS)

    1985-04-01

    This report contains the results of flooding studies of those stream channels that drain the proposed locations of a high-level nuclear-waste repository in Deaf Smith and Swisher Counties, Texas. Included are computations of the flood hydrographs and water surface profiles of the 100-year, 500-year, and probable maximum floods for Palo Duro Creek, Tule Creek, and Pleasant Draw. The hydrographs were produced according to the method of the Soil Conservation Service for ungaged watersheds, and the computations were made with computer programs developed by the US Army Corps of Engineers. The flood hydrographs were computed with the HEC-1 Flood Hydrograph Package and the water surface elevations with the HEC-2 Water Surface Profiles program. 76 refs., 19 figs., 16 tabs

  8. DCVD Measurements at the Laguna Verde NPP

    Energy Technology Data Exchange (ETDEWEB)

    Chen, J.D.; Gerwing, A.F. [Channel Systems Inc., Pinawa MA (Canada); Kosierb, R. [Canadian Nuclear Safety Commission, Ottawa, ON (Canada); Vones, J.; Broodryck, A. [International Atomic Energy Agency, Vienna (Austria)

    2006-12-30

    A new digital Cerenkov viewing device (DCVD) with high ultraviolet light sensitivity has been developed. Field measurements on BWR spent fuel at Laguna Verde Nuclear Power Plant Unit 2 resulted in new Cerenkov information on GE9 and GE12 spent fuel assemblies. Off-alignment measurements show: quantitative differences in the degree of light collimation from between the fuel rods; lack of light collimation from water rods; and decreased light collimation from partial length rod positions. Hidden rods could also be detected in off-angle views. The results indicate that it may be possible to detect missing partial-length fuel rods in GE12 fuel assemblies. The new DCVD was able to verify low burnup, long-cooled, natural uranium GE6 fuel assemblies.

  9. DCVD Measurements at the Laguna Verde NPP

    International Nuclear Information System (INIS)

    Chen, J.D.; Gerwing, A.F.; Kosierb, R.; Vones, J.; Broodryck, A.

    2006-01-01

    A new digital Cerenkov viewing device (DCVD) with high ultraviolet light sensitivity has been developed. Field measurements on BWR spent fuel at Laguna Verde Nuclear Power Plant Unit 2 resulted in new Cerenkov information on GE9 and GE12 spent fuel assemblies. Off-alignment measurements show: quantitative differences in the degree of light collimation from between the fuel rods; lack of light collimation from water rods; and decreased light collimation from partial length rod positions. Hidden rods could also be detected in off-angle views. The results indicate that it may be possible to detect missing partial-length fuel rods in GE12 fuel assemblies. The new DCVD was able to verify low burnup, long-cooled, natural uranium GE6 fuel assemblies

  10. Laguna Verde after the extended power increase

    International Nuclear Information System (INIS)

    Herrera C, M. N.; Castaneda G, M. A.; Cardenas J, J. B.; Garcia de la C, F. M.

    2012-10-01

    The project of extended power increase that was implemented in both units of the nuclear power plant of Laguna Verde beginning with the stage feasibility evaluation in nuclear side of the facilities, that is to say the affectation of the power increase in the equipment s, systems and components of the nuclear power plant; besides the feasibility evaluation a study cost-benefit for the rehabilitated and modernization of the equipment s, systems and components of Plant Balance was realized. Once considered technical and economically feasible the project began the engineering evaluations required to carry out the licensing of the new operation conditions, as well as beginning to the elaboration of the technical specifications purchase of the equipment s, systems and components of the Plant Balance. While on one hand was carried out the administration of the licensing of the extended power increase for other was carried out the necessary engineering to make the physical changes in the conventional side of the nuclear power plant. Once concluded the constructive stage beginning the final stage of the project, the starting-up tests, operation and performance of the Units under the new operation conditions. This work describes this last stage that contains the technical base, the realized tests and the obtained results. (Author)

  11. Spray pond design for nuclear power plants

    International Nuclear Information System (INIS)

    Codell, R.B.; Asce, A.M.

    1986-01-01

    This paper presents a complex methodology for assessing the performance of spray ponds in ultimate heat sink service at nuclear power plants. A spray pond performance model, developed in the companion paper, is used in conjunction with on-site and off-site meteorological data to predict the highest temperature and greatest 30 day water loss which can reasonable be expected to occur during the lifetime of the plant. The performance model for heat and mass transfer is used to develop an efficient phenomenological model used to scan the long-term meteorological records. Refined estimates of temperature or water loss may then be based on more complicated models if necessary. Short-term onsite data are correlated to the long-term off-site data to formulate correction factors for the difference in location. Cumulative distribution functions for temperature and water loss are determined from the long-term meteorological records to predict the occurrence of these quantities which are less severe that the peak. The methodology is demonstrated using data and parameters from the Palo Verde nuclear plant as an example

  12. Composition of fluid inclusions in Permian salt beds, Palo Duro Basin, Texas, U.S.A.

    Science.gov (United States)

    Roedder, E.; d'Angelo, W. M.; Dorrzapf, A.F.; Aruscavage, P. J.

    1987-01-01

    Several methods have been developed and used to extract and chemically analyze the two major types of fluid inclusions in bedded salt from the Palo Duro Basin, Texas. Data on the ratio K: Ca: Mg were obtained on a few of the clouds of tiny inclusions in "chevron" salt, representing the brines from which the salt originally crystallized. Much more complete quantitative data (Na, K, Ca, Mg, Sr, Cl, SO4 and Br) were obtained on ??? 120 individual "large" (mostly ???500 ??m on an edge, i.e., ??? ??? 1.6 ?? 10-4 g) inclusions in recrystallized salt. These latter fluids have a wide range of compositions, even in a given piece of core, indicating that fluids of grossly different composition were present in these salt beds during the several (?) stages of recrystallization. The analytical results indicating very large inter-and intra-sample chemical variation verify the conclusion reached earlier, from petrography and microthermometry, that the inclusion fluids in salt and their solutes are generally polygenetic. The diversity in composition stems from the combination of a variety of sources for the fluids (Permian sea, meteoric, and groundwater, as well as later migrating ground-, formation, or meteoric waters of unknown age), and a variety of subsequent geochemical processes of dissolution, precipitation and rock-water interaction. The compositional data are frequently ambiguous but do provide constraints and may eventually yield a coherent history of the events that produced these beds. Such an understanding of the past history of the evaporite sequence of the Palo Duro Basin should help in predicting the future role of the fluids in the salt if a nuclear waste repository is sited there. ?? 1987.

  13. Inspection activities of the Mexican regulatory body during the construction stage of the first unit of Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Salgado Gonzalez, Julio Ricardo

    1996-01-01

    The paper addresses the regulatory framework established for the design, construction and operation of the NPP. The regulatory bases of the inspection program are mentioned.A summary of the inspection and reviewing activities carried out by the former Nuclear Safety Management Construction area during the construction stage, taking the year 1977 as the beginning of regular inspection activities for this construction stage, and up to the year 1987, when this one is considered as practically completed, and a stage of pre-operational tests has been started. Finally, the main inspection areas are described, and a summary is given of the classification of deficiencies detected during the inspections

  14. Kodanikupäev, kas ainult kalendri jaoks? / Urve Palo

    Index Scriptorium Estoniae

    Palo, Urve, 1972-

    2007-01-01

    Ilmunud ka: Põhjarannik, 13. nov. 2007, lk. 4; Severnoje Poberezhje, 13. nov. 2007, lk. 4; Meie Maa, 13. nov. 2007, lk. 2; Valgamaalane, 13. nov. 2007, lk. 2; Nädalaleht, 9. nov. 2007, lk. 8; Lääne Elu, 15. nov. 2007, lk. 2; Koit, 15. nov. 2007, lk. 6; Virumaa Teataja, 22. nov. 2007, lk. 2; Pärnu Postimees, 24. nov. 2007, lk. 19. Rahvastikuminister Urve Palo sõnul on riigi ülesanne kindlustada turvaline Eesti riik - keskkond elamiseks, õppimiseks, töötamiseks, laste kasvatamiseks ning ühiskondlikuks tegevuseks

  15. Considerations for increasing unit 1 spent fuel pool capacity at the Laguna Verde station

    International Nuclear Information System (INIS)

    Vera, A.

    1992-01-01

    To increase the spent fuel storage capacity at the Laguna Verde Station in a safe and economical manner and assure a continuous operation of the first Mexican Nuclear Plant, Comision Federal de Electricidad (CFE), the Nation's Utility, seeked alternatives considering the overall world situation, the safety and licensing aspects, as well as the economics and the extent of the nuclear program of Mexico. This paper describes the alternatives considered, their evaluation and how the decision taken by CFE in this field, provides the Laguna Verde Station with a maximum of 37 years storage capacity plus full core reserve

  16. Reductive dechlorination rate data for 4,4'-DDE in sediments of the Palos Verdes Shelf, CA (1981-2010)

    Data.gov (United States)

    Department of the Interior — Wastes from the world’s largest manufacturer of DDT were released into the Los Angeles County municipal sewer system from 1947 to 1971. Following primary treatment,...

  17. Archaeological Test Excavations at CA-LAn-105, -291, and -1269, Palos Verdes Peninsula, Los Angeles County, California.

    Science.gov (United States)

    1986-08-01

    averages 51 percent. The average yearly temperature in the hills is approximately 67 degrees (Woodring et al. k 1946:8-9). In general, the native...as early as 1835, and, because of the soil and climatic conditions, may not have been present in any quantity in the hills even during late prehistoric...and upper parts, labeled the Valmonte Diatomite and the Malaga Mudstone members, respectively, consist of organic siliceous shale, silty shale, chert

  18. The PALOS project and its significance for industrial application

    Energy Technology Data Exchange (ETDEWEB)

    Guzzella, L. [Swiss Federal Institute of Technology Zuerich (ETHZ), Institute for Measurement and Control Laboratory (IMRT), Zuerich (Switzerland); Spring, P. [Swiss Federal Institut of Technology Zuerich (ETHZ), Institut fuer Mess- und Regeltechnik, Zuerich (Switzerland)

    2001-07-01

    This report compiled by the Swiss Federal Institute of Technology ETH introduces the PALOS (PArt Load Optimised System) concept for a downsized supercharged engine. The authors note that a mid-class passenger car needs an average power at the wheel of only 4.5 kW for typical driving cycles. For acceleration from 0 to 100 km/h within 10 seconds, however, the same vehicle requires a wheel power of approximately 120 kW. Thus, the engine efficiency is low under part load driving conditions. The objectives of the PALOS project are discussed as are methods to increase engine systems efficiency. Close collaboration with industrial partners during the whole project that lead to a high level of know-how transfer from university to industry and vice versa is noted. Four PhD theses on the subject are summarised: Part-load optimised engine systems, engine thermo-management for fuel consumption reduction, optimal operation of CVT-based powertrains and mean value modelling of a pressure wave supercharger (PWS), including exhaust gas recirculation, is looked at.

  19. Area environmental characterization report of the Dalhart and Palo Duro basins in the Texas Panhandle. Volume II. Palo Duro basin

    International Nuclear Information System (INIS)

    1982-09-01

    This area report describes the environmental characteristics of the Dalhart and Palo Duro basins of the Texas Panhandle portion of the Permian basin. Both basins are rather sparsely populated, and the overall population is decreasing. The economic base is centered on agribusiness and manufacturing. Most of the potentially conflicting land uses in both basins (i.e., parks, historic sites) occupy small land areas, with the exception of a national grassland in the Dalhart and military air training routes in both basins. Ground transportation in the Dalhart basin is adequate, and it is well developed in the Palo Duro basin. In both basins irrigation constitutes the principal water use, and groundwater is the principal source. However, the dominant aquifer, the Ogallala, is being depleted. Both basins consist primarily of grasslands, rangelands, and agricultural areas. No critical terrestrial or aquatic habitats have been identified in the basins, though several endangered, threatened, or rare terrestrial species occur in or near the basins. Aquatic resources in both basins are limited because of the intermittent availability of water and the high salt content of some water bodies. Playa lakes are common, though usually seasonal or rain dependent. The climate of the area is semiarid, with low humidity, relatively high wind speeds, and high variable precipitation. Restrictive dispersion conditions are infrequent. National ambient secondary air quality standards for particulates are being exceeded in the area, largely because of fugitive dust, although there are some particulate point sources

  20. Application of a new methodology on the multicycle analysis for the Laguna Verde NPP en Mexico

    International Nuclear Information System (INIS)

    Cortes C, Carlos C.

    1997-01-01

    This paper describes the improvements done in the physical and economic methodologies on the multicycle analysis for the Boiling Water Reactors of the Laguna Verde NPP in Mexico, based on commercial codes and in-house developed computational tools. With these changes in our methodology, three feasible scenarios are generated for the operation of Laguna Verde Nuclear Power Plant Unit 2 at 12, 18 and 24 months. The physical economic results obtained are showed. Further, the effect of the replacement power is included in the economic evaluation. (author). 11 refs., 3 figs., 7 tabs

  1. Repository site data and information in bedded salt: Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Tien, P.; Nimick, F.B.; Muller, A.B.; Davis, P.A.; Guzowski, R.V.; Duda, L.E.; Hunter, R.L.

    1983-11-01

    This report is a compilation of data from the literature on the Palo Duro Basin. The Palo Duro Basin is a structural basin, about 150 miles long and 80 miles wide, that is a part of the much larger Permian Basin. The US Department of Energy is investigating the Palo Duro Basin as a potentially suitable area for the site of a repository for the disposal of high-level radioactive waste. Sediments overlying the Precambrian basement range from about 5000 to about 11,000 ft in thickness and from Cambrian to Holocene in age. The strata in the Palo Duro Basin that are of primary interest to the Department of Energy are the bedded salts of the Permian San Andres Formation. The total thickness of the bedded salts is about 2000 ft. The geology of the Palo Duro Basin is well understood. A great deal of information exists on the properties of salt, although much of the available information was not collected in the Palo Duro Basin. Mineral resources are not currently being exploited from the center of the Palo Duro Basin at depth, although the possibility of exploration for and development of such resources can not be ruled out. The continued existence of salts of Permian age indicates a lack of any large amount of circulating ground water. The hydrology of the pre-Tertiary rocks, however, is currently too poorly understood to carry out detailed, site-specific hydrologic modeling with a high degree of confidence. In general, ground water flows from west to east in the Basin. There is little or no hydraulic connection between aquifers above and below the salt sequences. Potable water is pumped from the Ogallala aquifer. Most of the other aquifers yield only nonpotable water. More extensive hydrological data are needed for detailed future modeling in support of risk assessment for a possible repository for high-level waste in the Palo Duro Basin. 464 references

  2. Testing and sampling of deep brine aquifers in the Palo Duro Basin, West Texas

    International Nuclear Information System (INIS)

    Deyling, M.A.

    1984-01-01

    The US Department of Energy is investigating the Palo Duro Basin of West Texas along with locations in Nevada, Washington, Utah, Mississippi and Louisiana as potential sites for storage of high-level nuclear waste. Ten wells have been drilled to depths between 3000 and 8300 feet. Testing and sampling of deep test zones requires advance planning and analysis of what must be obtained from the well. Various alternatives are available depending on data needs. In this particular instance, both hydrologic and geochemical data were required. The methods chosen were field proven methods used in the oil field industry for many years. Short term testing has included conventional oil-field-type drill stem tests and drill stem equipment with surface pressure readout. Long term testing has consisted of a series of production and recovery tests. Fluid sampling was performed in two stages. The first was at the well head under an imposed pressure of several hundred psi. The second fluid samples were collected downhole at the production zone under pressures close to ambient pressure. The geochemical data and hydrologic data can be used as independent checks on each other in many cases. Test results from the well along with examination of recovered core provided maximum data for each well. 5 references, 8 figures

  3. Amount and nature of occluded water in bedded salt, Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Fisher, R.S.

    1987-01-01

    The quantity and types of fluids within bedded salt cores from the Permian San Andres Formation, Palo Duro, Texas, were evaluated at the Texas Bureau of Economic Geology. Bedded halite from the San Andres Formation and other salt-bearing units were selected to represent the variety of salt types present, and were then analyzed. The mean water content of ''pure'' samples (more than 90% halite) is 0.4 weight percent, with none observed greater than 1.0 weight percent. Samples that contain more than 10 weight percent clay or mudstone display a trend of increasing water content with increasing clastic material. Chaotic mudstone-halite samples have as much as 5 weight percent water; halite-cemented mudstone interlayers, common throughout the bedded salts, may have water content values as high as 10 to 15 weight percent based on extrapolation of existing data that range from 0 to about 6%. No significant difference exists between the mean water content values of ''pure salt'' from the upper San Andres, lower San Andres Cycle 5, and lower San Andres Cycle 4 salt units. The fraction of total water present as mobile intergranular water is highly variable and not readily predicted from observed properties of the salt sample. The amount of water that would be affected by a high-level nuclear waste repository can be estimated if the volume of halite, the volume of clastic interlayers, and the amount and type of impurity in halite are known. Appendix contains seven vugraphs

  4. Fuel management inside the reactor. Report of generation of the nuclear bank for the fuel of the initial load of the Laguna Verde U-1 reactor with the FMS codes

    International Nuclear Information System (INIS)

    Alonso V, G.; Torres A, C.

    1991-06-01

    In this work in a general way the form in that it was generated the database of the initial fuel load of the Laguna Verde Unit 1 reactor is described. The initial load is formed with fuel of the GE6 type. The obtained results during the formation of the database in as much as to the behavior of the different cell parameters regarding the one burnt of the fuel and the variation of vacuums in the coolant channel its are compared very favorably with those reported by the General Electric fuel supplier and reported in the design documents of the same one. (Author)

  5. Geophysical evidence for an extensive Pie de Palo Complex mafic-ultramafic belt, San Juan, Argentina

    Science.gov (United States)

    Chernicoff, Carlos J.; Vujovich, Graciela I.; van Staal, Cees R.

    2009-12-01

    The recent completion of a high-resolution aeromagnetic survey over the Pie de Palo uplift of the western Sierras Pampeanas has revealed an area of large magnetic anomalies associated with the Pie de Palo Complex. The Las Pirquitas thrust, which has transported and uplifted the Pie de Palo Complex, is recognized for at least 30 km in a roughly NE direction along the western boundary of the Pie de Palo Complex, beyond its limited outcrop. The type of sediments of the Caucete Group in the footwall of the Las Pirquitas thrust, which are regarded as the leading edge of the Precordillera terrane, are associated with much less pronounced magnetic anomalies. In addition, a conspicuous, NNE trending, broad magnetic high stands out in the survey, several kilometers to the east of the main outcrops of the Pie de Palo Complex; this broad magnetic anomaly bisects the Pie de Palo basement block, and continues further south at least as far as 32°S, the southern boundary of the latest aeromagnetic survey. This magnetic anomaly is interpreted to represent a structure corresponding to the Grenvillian Precordillera-Pie de Palo tectonic boundary zone, and would comprise the buried largest part of the mafic-ultramafic belt. The geophysical model of the magnetic data indicates that the boundary zone dips to the east, possibly suggesting the existence of a set of synthetic east dipping, west-verging thrusts, of which only one major structure (Las Pirquitas thrust) is exposed; the possibility of other slivers of upthrust boundary zone material cannot be excluded. It is considered that the Pie de Palo Complex represents a small sliver upthrust from the unexposed boundary zone material (containing highly magnetic mafic-ultramafic rocks). The east-dipping, west verging structures associated with the Pie de Palo Complex are suggested to represent an Ordovician reactivation of a Grenvillian suture zone developed when the Precordillera basement and Pie de Palo terrane docked; this

  6. Fluid inclusion brine compositions from Palo Duro Basin salt sites

    International Nuclear Information System (INIS)

    Moody, J.B.

    1987-01-01

    The fluid inclusion analyses were done on salt samples from Lower San Andres Cycle 4 and 5. The stable isotope composition of the fluid inclusion brines was measured on duplicate samples taken from the same fluid inclusion brine for correlation of geochemical content with the stable isotopic content. The analyzed Palo Duro Basin salt fluid inclusions are predominantly one phase, i.e., the presence of a fluid only. However, many of the larger fluid inclusions do have a small vapor bubble. This liquid/vapor ratio is so high in these vapor-containing fluid inclusions that their behavior in a thermal gradient would be almost identical to that of all liquid inclusions. Closely associated with the fluid inclusions are cryptomelane where some fibers penetrate into halite host crystal. The fluid inclusions have a wide variability in content for those components that were analyzed, even within the same salt type. The fluid inclusion brines are also acidic, ranging from 3 to 6 as measured with pH test papers

  7. An underwater robot controls water tanks in nuclear power plants

    International Nuclear Information System (INIS)

    Lardiere, C.

    2015-01-01

    The enterprises Newton Research Labs and IHI Southwest Technologies have developed a robot equipped with sensors to inspect the inside walls (partially) and bottom of water tanks without being obliged to empty them. The robot called 'Inspector' is made up of 4 main components: a chassis with 4 independent steering wheels, a camera video system able to provide a 360 degree view, various non-destructive testing devices such as underwater laser scanners, automated ultra-sound or Foucault current probes and an operation system for both driving the robot and controlling the testing. The Inspector robot has been used to inspect the inside bottom of an operating condensate tank at the Palo Verde nuclear station. The robot was able to check all the welds joining the bottom plates and the welds between the walls and the bottom. The robot is also able to come back to the exact place where a defect was detected during a previous inspection. (A.C.)

  8. Talento verde y cadenas de suministro verdes: ¿existe una relación significativa?

    Directory of Open Access Journals (Sweden)

    María del Carmen Torres-Salazar

    2016-01-01

    Full Text Available Introducción: En este texto se presentan resultados estadísticos de la relación entre directivos con características de talento verde y la implementación de prácticas de cadena de suministro verde. Debido a que existen investigaciones sobre la importancia de la visión de la alta dirección para la adopción de prácticas verdes; y sin embargo ninguna da cuenta de las características personales del directivo, ni tampoco de la relación significativa entre estas características y la puesta en marcha de prácticas de cadena de suministro verde, esta es la aportación de la presente investigación. El trabajo se desarrolló en empresas manufactureras con más de diez trabajadores de la zona oriente del estado de Morelos México. La caracterización del término talento verde se reportó en el artículo, Talento verde: caracterización y búsqueda, publicado en el número 14 de esta revista. Método: El método utilizado consistió en la construcción de una encuesta dividida en tres categorías que posteriormente se convirtieron en variables: prácticas de cadena de suministro verde, presiones institucionales y talento verde. Las dos primeras se adaptaron de la encuesta de Zhu y Sarkis (2007 y la tercera surgió de la representación social de talento verde, producto de una fase de esta investigación. La encuesta se validó con un grupo de empresarios miembros de la Cámara Nacional de la Industria de la Transformación (CANACINTRA capítulo Morelos. El instrumento validado se aplicó a 26 directivos de empresas manufactureras con más de diez trabajadores de la zona oriente de Morelos, con el fin de probar la relación entre directivos con características de talento verde y la puesta en marcha de prácticas de cadena de suministro verde. Para ello se utilizaron como herramientas estadísticas la correlación de Pearson y la regresión lineal múltiple. Resultados: Las prácticas de cadena de suministro verde de las empresas

  9. 36 CFR 7.39 - Mesa Verde National Park.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Mesa Verde National Park. 7... SPECIAL REGULATIONS, AREAS OF THE NATIONAL PARK SYSTEM § 7.39 Mesa Verde National Park. (a) Visiting of... the admission of commercial automobiles and buses to Mesa Verde National Park, contained in § 5.4 of...

  10. Radiological protection in Laguna Verde, the challenge of being better

    International Nuclear Information System (INIS)

    Serrano R, H.

    2008-01-01

    The operation of the nuclear power plants in the last decade is based on the application of standard directed towards the excellence. The nuclear power plant of Laguna Verde (CNLV), is not the exception and in the 18 years of commercial operation, the safety culture has matured in the personnel. Standard and political implemented like in the control of dosimeter alarms, equipment condition, meetings pre-work, the practice of protection to the systems and the fuel, as well as the order and the cleaning have distinguished to the CNLV with other power stations. The sense of property of the personnel towards its work is fundamental for the achievement of results. It is reason for the present work to show since it has been gotten to obtain results directed to the excellence in the activities or of normal operation and recharge, where the security is the principle priority. (Author)

  11. Developing and modeling of the 'Laguna Verde' BWR CRDA benchmark

    International Nuclear Information System (INIS)

    Solis-Rodarte, J.; Fu, H.; Ivanov, K.N.; Matsui, Y.; Hotta, A.

    2002-01-01

    Reactivity initiated accidents (RIA) and design basis transients are one of the most important aspects related to nuclear power reactor safety. These events are re-evaluated whenever core alterations (modifications) are made as part of the nuclear safety analysis performed to a new design. These modifications usually include, but are not limited to, power upgrades, longer cycles, new fuel assembly and control rod designs, etc. The results obtained are compared with pre-established bounding analysis values to see if the new core design fulfills the requirements of safety constraints imposed on the design. The control rod drop accident (CRDA) is the design basis transient for the reactivity events of BWR technology. The CRDA is a very localized event depending on the control rod insertion position and the fuel assemblies surrounding the control rod falling from the core. A numerical benchmark was developed based on the CRDA RIA design basis accident to further asses the performance of coupled 3D neutron kinetics/thermal-hydraulics codes. The CRDA in a BWR is a mostly neutronic driven event. This benchmark is based on a real operating nuclear power plant - unit 1 of the Laguna Verde (LV1) nuclear power plant (NPP). The definition of the benchmark is presented briefly together with the benchmark specifications. Some of the cross-sections were modified in order to make the maximum control rod worth greater than one dollar. The transient is initiated at steady-state by dropping the control rod with maximum worth at full speed. The 'Laguna Verde' (LV1) BWR CRDA transient benchmark is calculated using two coupled codes: TRAC-BF1/NEM and TRAC-BF1/ENTREE. Neutron kinetics and thermal hydraulics models were developed for both codes. Comparison of the obtained results is presented along with some discussion of the sensitivity of results to some modeling assumptions

  12. Hospitales reformando al mundo verde

    Directory of Open Access Journals (Sweden)

    Sandra Milene Rojas-Criollo

    2016-12-01

    Full Text Available Introducción: factores ambientales como el cambio climático, el calentamiento global, el mal uso del suelo y del agua, la mala administración de los recursos naturales, la contaminación del aire en espacios abiertos y cerrados, el crecimiento urbano y la industrialización han ocasionado cambios en los procesos naturales del planeta; para la Organización Mundial de la Salud constituyen una barrera significativa que impide alcanzar los objetivos del milenio y del desarrollo sostenible, haciendo cada vez más grave su aplicación y generando un ambiente hostil para la vida de las personas. Metodología: investigación documental, descriptiva, con enfoque cualitativo. Se realizó búsqueda en las bases de datos Ebsco, Proquest, Scielo, Elsevier, etc., con descriptores en inglés y español. Se clasificó los artículos por similitudes, autores y definiciones; se agruparon 60 artículos en una matriz y, posteriormente, se analizaron y se integraron los conceptos para luego categorizarlos. Conclusiones: es de gran relevancia el conocimiento sobre hospitales verdes, ya que son empresas que promueven la salud pública y la reducción del impacto ambiental, además de la disminución de los índices de morbilidad y mortalidad. El personal de salud tiene un papel importante para desarrollar e implementar estas actividades en beneficio del ambiente y las personas

  13. Gamma thermometer longevity test: Laguna Verde 2 instruments recent performance

    International Nuclear Information System (INIS)

    Cuevas V, G.; Avila N, A.; Calleros M, G.

    2013-10-01

    This paper is informative of the General Electric Hitachi and Global Nuclear Fuel - Americas are collaboration with Comision Federal de Electricidad in a longevity test of thermocouples as power monitoring devices. The test conclusions will serve for final engineering design in detailing the Automated Fixed In-core Probes for calibration of the Local Power Range Monitors (LPRMs) of the Economic Simplified Boiling Water Reactor. This paper introduces the collaboration description and some recent performance evaluation of the thermocouples that are sensitive to gamma radiation and are known generically as Gamma Thermometers (G T). The G Ts in Laguna Verde 2 are radially located inside six instrumentation tubes in the core and consist of seven thermocouples, four are aligned with the LPRM heights and three are axially located between LPRM heights. The Laguna Verde 2 G T test has become the longest test of thermocouples as power monitoring devices in a BWR industry history and confirms their reliability in terms of time-dependent small noise under steady state reactor conditions and good agreement against Traversing In-core Probes power measurements. (Author)

  14. Gamma thermometer longevity test: Laguna Verde 2 instruments recent performance

    Energy Technology Data Exchange (ETDEWEB)

    Cuevas V, G. [Global Nuclear Fuel, Americas, 3901 Castle Hayne Road, Wilmington, North Carolina (United States); Avila N, A.; Calleros M, G., E-mail: Gabriel.Cuevas-Vivas@gnf.com [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verda, Carretera Veracruz-Nautla Km 42.5, Alto Lucero, Veracruz (Mexico)

    2013-10-15

    This paper is informative of the General Electric Hitachi and Global Nuclear Fuel - Americas are collaboration with Comision Federal de Electricidad in a longevity test of thermocouples as power monitoring devices. The test conclusions will serve for final engineering design in detailing the Automated Fixed In-core Probes for calibration of the Local Power Range Monitors (LPRMs) of the Economic Simplified Boiling Water Reactor. This paper introduces the collaboration description and some recent performance evaluation of the thermocouples that are sensitive to gamma radiation and are known generically as Gamma Thermometers (G T). The G Ts in Laguna Verde 2 are radially located inside six instrumentation tubes in the core and consist of seven thermocouples, four are aligned with the LPRM heights and three are axially located between LPRM heights. The Laguna Verde 2 G T test has become the longest test of thermocouples as power monitoring devices in a BWR industry history and confirms their reliability in terms of time-dependent small noise under steady state reactor conditions and good agreement against Traversing In-core Probes power measurements. (Author)

  15. Complejo de restauración del atún rojo en Cabo de Palos : CRARCP

    OpenAIRE

    Denchev Torlakov, Ivaylo

    2016-01-01

    El proyecto pretende por una parte poner en valor el producto del atún rojo promocionando los nuevos valores de la cocina (I+D+I) y convertirlo en símbolo de identidad para el municipio de Cabo de Palos y la Región de Murcia. Por otra parte se busca la reactivación y definición de un borde urbano en Cabo de Palos. Para ello se definen los siguientes objetivos: - Analizar el entorno urbano existente, evaluarlo y proponer soluciones que permitan mejorar las condiciones del mismo, impulsando la ...

  16. Verde pentru biciclete (Green for Bycicles

    Directory of Open Access Journals (Sweden)

    Romina Faur

    2011-06-01

    Full Text Available The campaign “Verde pentru biciclete” (Engl. “Green for bicycles” is the first official initiative from Timişoara that encourages adopting cycling as an ecological and economical alternative to urban transportation; this addresses the citizens of Timişoara and not only, regardless of age. “Verde pentru biciclete” is a pedalling movement supported by the Bega Foundation, in collaboration with the Gratzu Sportive Club, KissFM, Ziua de Vest, Agenda and agenda.ro. The debut of the campaign took place of October 25th 2008, with the first “Verde pentru biciclete” event – “The bicycles Counting”. All the events that followed were held to draw attention on the importance of cycling, together with obtaining of certain facilities, necessary for the cyclists’ safe movement in traffic. Moreover, a number of communication platforms have been created between the fans of cycling; thus, the website www.pedaleaza.ro has been created, through which those interested can inform themselves or communicate on the forum and discussions group verde_pentru_biciclete@yahoogroups.com o through the social network Facebook (facebook.com/ verdepentrubiciclete. This paper presents the activities held within the campaign since its beginning until today, as well as our future plans.

  17. Seismic qualification tests of fans of the NPP of Laguna Verde U-1 and U-2

    International Nuclear Information System (INIS)

    Jarvio C, G.; Garcia H, E. E.; Arguelles F, R.; Vela H, A.; Naranjo U, J. L.

    2013-10-01

    This work presents the results of the seismic qualification tests applied to the fans that will be installed in the control panels of the three divisions of the diesel generators of the nuclear power plant (NPP) of Laguna Verde, Unit-1 and Unit-2. This seismic qualification process of the fans was carried out using two specimens that were tested in the seismic table (vibrating) of the Engineering Institute of Universidad Nacional Autonoma de Mexico (UNAM), in accordance with the requirements of the standard IEEE 344-1975, to satisfy the established requirements of seismic qualification in the technical specifications and normative documents required by the nuclear standards, in order to demonstrate its application in the diesel generators Divisions I, II and III of the NPP. The seismic qualification tests were developed on specimens that were retired of the NPP of Laguna Verde recently with a service life of 7.75 years. (Author)

  18. Technical assistance in relationship with the reloading analysis of the Laguna Verde Unit 2 reactor. Executive abstract

    International Nuclear Information System (INIS)

    Alonso V, G.; Castro B, M.; Gallegos E, R.; Hernandez L, H.; Montes T, J.L.; Ortiz S, J. J.; Perusquia C, R.

    1993-11-01

    The objective of the report was to carry out a comparative analysis of costs of energy generation among the designs GE9B of General Electric, 9X9-IX of SIEMENS and SVEA-96 of ABB ATOM, proposed to be used as recharge fuel in the Unit 2 of the Laguna Verde Nuclear Power station. (Author)

  19. Impact on the bar value in hot by the introduction of advanced control bars in the Unit 1 of the Laguna Verde Nuclear power plant; Impacto sobre el valor de barra en caliente por la introduccion de barras de control avanzadas en la U1 de la CNLV

    Energy Technology Data Exchange (ETDEWEB)

    Montes, J.L.; Perusquia, R.; Ortiz, J.J.; Hernandez, J.L.; Ramirez, J.R. [ININ, Carretera Mexico-Toluca Km. 36.5, 52045 Estado de Mexico (Mexico)]. e-mail: jlmt@nuclear.inin.mx

    2004-07-01

    In recent dates the Laguna Verde Nuclear Power station (CNLV) has acquired new designs of control bars, this new type of bars presents modifications important in their design. For what is important to analyze their performance inside those reactors of this nuclear power station. Presently work is shown the behavior of the nucleus of the reactor in hot condition (HFP) when three different types of control bar are used. The first of them corresponds the one that initially has been used in this power station and that we will call original. The second type of control bars, it corresponds to an advanced type and it is the first design different from the original and it corresponds to a bar design that it includes Hafnium (Hf) like one of their neutronic absorption characteristics. The third, denoted as 2AV, include besides the material of the second type new design characteristics, and it is the last finish bar type that it has been introduced in the operation of the reactors of the CNLV. With base in the studied cases is found that the bars 2AV have a total power value, 7.6 % bigger respect the bars 1AV; and in turn the bars 1AV, 6.1 % bigger with respect the ORG control bars. (Author)

  20. Fuel failure at the Laguna Verde unit 1- during Cycle 4

    International Nuclear Information System (INIS)

    Espinosa Vega, Juan Manuel

    1996-01-01

    The present work describes the event occurred at the Laguna Verde nuclear power plants Unit 1 during its fourth cycle ensembles; the first failure, by means of a test of power suppression, and the second one, during the sipping accomplished in the four refuelling of the unit. Also it describes the re-evaluation of the event accomplished by the licenser, the manufacturer and the Mexican agency

  1. Engineering evaluation of a formerly utilized MED/AEC site. Site A and Plot M, Palos Forest Preserve, Palos Park, Illinois

    International Nuclear Information System (INIS)

    1979-09-01

    This engineering evaluation report (EER) addresses one of these MED/AEC sites known as Site A/Plot M, located in Palos Park, Illinois. The EER describes in technical detail a number of options for remedial action that could be taken with respect to the contamination at Site A/Plot M and presents estimates of the costs associated with these options. A companion document, Environmental Analysis Report on a Formerly Utilized MED/AEC Site, Site A and Plot M, Palos Forest Preserve, Palos Park, Illinois (ANL/ES-79), has also been prepared. It describes in detail the existing site environment and evaluates the environmental impacts of the various remedial options discussed in this report. This EER contributes to a better understanding of the mitigation or resolution of environmental problems posed by the subject MED/AEC site and serves as a basis for determining whether or not remedial actions are warranted. The knowledge derived from the evaluation of a number of remedial options should be helpful in the final disposition of other MED/AEC sites located elsewhere

  2. Modeling of the vapor cycle of Laguna Verde with the PEPSE code to conditions of thermal power licensed at present (2027 MWt)

    International Nuclear Information System (INIS)

    Castaneda G, M. A.; Maya G, F.; Medel C, J. E.; Cardenas J, J. B.; Cruz B, H. J.; Mercado V, J. J.

    2011-11-01

    By means of the use of the performance evaluation of power system efficiencies (PEPSE) code was modeled the vapor cycle of the nuclear power station of Laguna Verde to reproduce the nuclear plant behavior to conditions of thermal power, licensed at present (2027 MWt); with the purpose of having a base line before the implementation of the project of extended power increase. The model of the gauged vapor cycle to reproduce the nuclear plant conditions makes use of the PEPSE model, design case of the vapor cycle of nuclear power station of Laguna Verde, which has as main components of the model the great equipment of the vapor cycle of Laguna Verde. The design case model makes use of information about the design requirements of each equipment for theoretically calculating the electric power of exit, besides thermodynamic conditions of the vapor cycle in different points. Starting from the design model and making use of data of the vapor cycle measured in the nuclear plant; the adjustment factors were calculated for the different equipment s of the vapor cycle, to reproduce with the PEPSE model the real vapor cycle of Laguna Verde. Once characterized the model of the vapor cycle of Laguna Verde, we can realize different sensibility studies to determine the effects macros to the vapor cycle by the variation of certain key parameters. (Author)

  3. QUÍMICA VERDE: UN NUEVO RETO

    Directory of Open Access Journals (Sweden)

    Nerlis Paola Pájaro Castro

    2011-01-01

    Full Text Available En la actualidad, existe un enorme deterioro del medio ambiente que ha generado la necesidad de buscar alternativas que conduzcan a la sostenibilidad ambiental. Una de estas herramientas es la ¿química verde¿, concepto que contempla el diseño de productos y procesos que reduzcan la generación de sustancias peligrosas y maximicen la eficiencia en la utilización de recursos materiales y energéticos. El empleo de tecnologías menos contaminantes, permitirá a las empresas químicas mitigar los efectos ambientales asociados a su actividad, reduciendo el consumo de materiales e incrementando la participación de recursos renovables. Para alcanzar estas metas, se han propuesto 12 principios básicos de química verde, aplicables en diferentes campos, tales como la medicina, la agricultura, la industria química y farmacéutica. Esta revisión detalla los principios y usos principales de la química verde, y su aplicación como una filosofía de trabajo para avanzar hacia un verdadero desarrollo sostenible.

  4. Modeling of the vapor cycle of Laguna Verde with the PEPSE code to conditions of thermal power licensed at present (2027 MWt); Modelado del ciclo de vapor de Laguna Verde con el codigo PEPSE a condiciones de potencia termica actualmente licenciada (2027 MWt)

    Energy Technology Data Exchange (ETDEWEB)

    Castaneda G, M. A.; Maya G, F.; Medel C, J. E.; Cardenas J, J. B.; Cruz B, H. J.; Mercado V, J. J., E-mail: miguel.castaneda01@cfe.gob.mx [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Carretera Cardel-Nautla Km 42.5, Veracruz (Mexico)

    2011-11-15

    By means of the use of the performance evaluation of power system efficiencies (PEPSE) code was modeled the vapor cycle of the nuclear power station of Laguna Verde to reproduce the nuclear plant behavior to conditions of thermal power, licensed at present (2027 MWt); with the purpose of having a base line before the implementation of the project of extended power increase. The model of the gauged vapor cycle to reproduce the nuclear plant conditions makes use of the PEPSE model, design case of the vapor cycle of nuclear power station of Laguna Verde, which has as main components of the model the great equipment of the vapor cycle of Laguna Verde. The design case model makes use of information about the design requirements of each equipment for theoretically calculating the electric power of exit, besides thermodynamic conditions of the vapor cycle in different points. Starting from the design model and making use of data of the vapor cycle measured in the nuclear plant; the adjustment factors were calculated for the different equipment s of the vapor cycle, to reproduce with the PEPSE model the real vapor cycle of Laguna Verde. Once characterized the model of the vapor cycle of Laguna Verde, we can realize different sensibility studies to determine the effects macros to the vapor cycle by the variation of certain key parameters. (Author)

  5. Intraplate seismicity across the Cape Verde swell

    Science.gov (United States)

    Vales, Dina; Matias, Luís.; Haberland, Christian; Silveira, Graça.; Weber, Michael; Carrilho, Fernando; Dias, Nuno

    2010-05-01

    The Cape Verde Archipelago ((15-17°N, 23-26°W) is located within the African plate, about 500km west of Senegal, in the African coast. The islands are located astride the Cape Verde mid-plate topographic swell, one of the largest features of its type in the world's ocean basins. The origin of this Cape Verde swell is still in debate. Previous determinations of the elastic thickness (Te) reveal a normal Te and a modest heat flow anomaly which suggest that the swell cannot be fully explained by uplift due to thermal reheating of the lithosphere by an underlying ‘‘hot spot'' and that other, deep-seated, mantle processes must be involved. The CV-PLUME (An investigation on the geometry and deep signature of the Cape Verde mantle plume) project intends to shape the geometry and deep origin of the Cape Verde mantle plume, via a combined study of seismic, magnetic, gravimetric and geochemical observations. Through this study we intend to characterize the structure beneath the archipelago from the surface down to the deep mantle. The core of this 3-year project was a temporary deployment of 39 Very Broad Band seismometers, across all the inhabited islands, to recorder local and teleseismic earthquakes. These instruments were operational from November 2007 to September 2008. In this work we report on the preliminary results obtained from the CV-PLUME network on the characterization of the local and regional seismicity. To detect the small magnitude seismic events the continuous data stream was screened using spectrograms. This proved to be a very robust technique in the face of the high short-period noise recorded by many of the stations, particularly during day time. The 10 month observation time showed that the background seismic activity in the Archipelago and surrounding area is low, with only a very few events recorded by the complete network. However, two clusters of earthquakes were detected close to the Brava Island, one to the NW and a second one, more active

  6. Participation of the ININ in the external radiological emergency plan of the Laguna Verde power plant

    International Nuclear Information System (INIS)

    Martinez S, R.; Cervini L, A.

    1991-01-01

    The planning of performances in radiological emergencies, with the object of reducing the consequences as much as possible on the population to accidental liberations of radioactive material coming from Nuclear power plant, it has been of main interest in the nuclear community in the world. In Mexico it has not been the exception, since with the setting in march of the Laguna Verde nuclear power plant exists an executive program of planning for emergencies that it outlines the activities to follow trending to mitigate the consequences that are derived of this emergency. As integral part of this program this the External Plan of Radiological Emergency (PERE) that covers the emergencies that could leave the frontiers of the Laguna Verde power plant. In the PERE it settles down the planning, address and control of the preparation activities, response and recovery in emergencies, as well as the organization and coordination of the institutions that participate. The National Institute of Nuclear Research (ININ), like integral part of these institutions in the PERE, has an infrastructure that it allows to participate in the plan in a direct way in the activities of 'Control of the radiological exhibition the response personnel and control of water and foods' and of support way and consultant ship in the activities of 'Monitoring, Classification and decontamination of having evaluated' and 'Specialized medical radiological attention'. At the moment the ININ has a radiological mobile unit and this conditioning a second mobile unit to carry out part of the activities before mentioned; also accounts with 48 properly qualified people that directly intervene in the plan. In order to guarantee an adequate response in the PERE an organization it has been structured like that of the annex as for the personnel, transport, team, procedures and communication system, with the objective always of guaranteeing the security and the population's health in emergency situations in the

  7. Camp Verde Adult Reading Program. Final Performance Report.

    Science.gov (United States)

    Maynard, David A.

    This document begins with a four-page performance report describing how the Camp Verde Adult Reading Program site was relocated to the Community Center Complex, and the Town Council contracted directly with the Friends of the Camp Verde Library to provide for the requirements of the program. The U.S. Department of Education grant allowed the…

  8. Major salt beds of the Palo Duro and Dalhart Basins, Texas

    International Nuclear Information System (INIS)

    1983-12-01

    Major salt beds are defined as salt intervals at least 75 feet thick that contain no interbeds greater than 10 feet thick and include no more than 15 percent non-salt interbeds. Maps based on the interpretation of geophysical logs from hundreds of oil and gas exploration wells reveal seven major salt beds in the Palo Duro Basin and one major salt bed in the Dalhart Basin. The most extensive major salt beds are in the central and northern Palo Duro Basin, in the Upper San Andres Formation and the Lower San Andres Formation Units 4 and 5. Of these, the major salt bed within the Lower San Andres Formation Unit 4 is the most widespread and generally the thickest. 7 references, 15 figures, 2 tables

  9. Perekond on kõige tähtsam / Urve Palo

    Index Scriptorium Estoniae

    Palo, Urve, 1972-

    2007-01-01

    Ilmunud ka: Hiiu Leht, 21. dets. 2007, lk. 2; Pärnu Postimees, 21. dets. 2007, lk. 15; Severnoje Poberezhje, 21. dets. 2007, lk. 2; Nädalaleht, 21. dets. 2007, lk. 2; Koit, 22. dets. 2007, lk. 6; Meie Maa, 22. dets. 2007, lk. 2; Molodjozh Estonii, 29. dets. 2007, lk. 4; Võrumaa Teataja, 5. jaan. 2008, lk. 3; Järva Teataja, 5. jaan. 2008, lk. 2. Rahvastikuminister Urve Palo jõulu- ja aastalõputervitus

  10. The Interactive Dimension of Communication: The Pragmatics of the Palo Alto Group

    OpenAIRE

    Codruţa Porcar; Cristian Hainic

    2011-01-01

    Our paper proposes to analyze from a semiotic perspective the process of communication as conceived within the Palo Alto Group. We will firstly show that, as a result of the Group's critiques and revisions of the linear or mechanistic theories of communication, new perspectives are brought about for the essential axes of transformation within communication: we do not communicate as from a distinct atom to another, through an isolated channel, but through parts which are equal to the whole, th...

  11. DOE Zero Energy Ready Home Case Study: Palo Duro Homes, Albuquerque, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2013-09-01

    Palo Duro uses advanced framing techniques like 2x6 24-inch on-center framing, open headers above windows on non-load-bearing walls, 2-stud corners, ladder blocking where walls intersect, and single top and bottom plates. These techniques reduce the amount of lumber in the wall, allowing more room for insulation and reducing costs and installation time. The builder garnered a 2013 Housing Innovation Award in the production builder category.

  12. Patterns of genetic diversity in three plant lineages endemic to the Cape Verde Islands.

    Science.gov (United States)

    Romeiras, Maria M; Monteiro, Filipa; Duarte, M Cristina; Schaefer, Hanno; Carine, Mark

    2015-05-15

    Conservation of plant diversity on islands relies on a good knowledge of the taxonomy, distribution and genetic diversity of species. In recent decades, a combination of morphology- and DNA-based approaches has become the standard for investigating island plant lineages and this has led, in some cases, to the discovery of previously overlooked diversity, including 'cryptic species'. The flora of the Cape Verde archipelago in the North Atlantic is currently thought to comprise ∼740 vascular plant species, 92 of them endemics. Despite the fact that it is considered relatively well known, there has been a 12 % increase in the number of endemics in the last two decades. Relatively few of the Cape Verde plant lineages have been included in genetic studies so far and little is known about the patterns of diversification in the archipelago. Here we present an updated list for the endemic Cape Verde flora and analyse diversity patterns for three endemic plant lineages (Cynanchum, Globularia and Umbilicus) based on one nuclear (ITS) and four plastid DNA regions. In all three lineages, we find genetic variation. In Cynanchum, we find two distinct haplotypes with no clear geographical pattern, possibly reflecting different ploidy levels. In Globularia and Umbilicus, differentiation is evident between populations from northern and southern islands. Isolation and drift resulting from the small and fragmented distributions, coupled with the significant distances separating the northern and southern islands, could explain this pattern. Overall, our study suggests that the diversity in the endemic vascular flora of Cape Verde is higher than previously thought and further work is necessary to characterize the flora. Published by Oxford University Press on behalf of the Annals of Botany Company.

  13. Active basement uplift as seen with cosmogenic lenses: the Sierra Pie de Palo case (Western Argentina)

    Science.gov (United States)

    Siame, L. L.; Sébrier, M.; Costa, C. H.; Ahumada, E. A.; Bellier, O.

    2013-12-01

    The Andean foreland of western Argentina (28°S-33°S) corresponds to retroarc deformations associated with the ongoing flat subduction of the Nazca plate beneath the South American lithosphere, and associated with high levels of seismic activity and crustal active faulting. To improve earthquake source identification and characterization in the San Juan region, data from seismology, structural geology and quantitative geomorphology can be integrated and combined to provide a seismotectonic model. In this model, the Andean back-arc of western Argentina has to be regarded as an obliquely converging foreland where Plio-Quaternary deformations are partitioned between strike-slip and thrust motions that are localized on the E-verging, thin-skinned Argentine Precordillera, and the W-verging thick-skinned Sierras Pampeanas, respectively. In this domain, the Sierra Pie de Palo is a key structure playing a major role in the partitioning of the Plio-Quaternary deformations. Located in the westernmost Sierras Pampeanas, the Sierra Pie de Palo forms a NNE striking, 80 km-long and 35-40 km-wide, ellipsoid range that reaches elevation as high as 3162 m. This mountain range is an actively growing basement fold associated with a high level of seismic activity (e.g., the November 23, 1977, Caucete, Mw 7.4 earthquake). To evaluate the degree of tectonic activity around the Sierra Pie de Palo, we combined a detailed morphometric analysis of the topography together with in situ-produced cosmogenic 10Be concentrations measured in (1) bedrock outcrops corresponding to the exhumed erosional regional surface, (2) surface boulders abandoned on alluvial fans deformed by active faults, and (3) in fluvial sediments sampled at the outlets of selected watersheds that drains out from the Sierra Pie de Palo. All together, our results allows: (1) assessing quantitative constraints on the rate of tectonic and denudation processes that are responsible for the active growth and erosion of the Sierra

  14. Seismic qualification tests of fans of the NPP of Laguna Verde U-1 and U-2; Pruebas de calificacion sismica de ventiladores de la Central Laguna Verde U1 and U2

    Energy Technology Data Exchange (ETDEWEB)

    Jarvio C, G.; Garcia H, E. E.; Arguelles F, R.; Vela H, A. [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico); Naranjo U, J. L., E-mail: gilberto.jarvio@inin.gob.mx [Comision Federal de Electricidad, Gerencia de Centrales Nucleoelectricas, Subgerencia de Ingenieria, Carretera Veracruz-Medellin Km 7.5, Dos Bocas, Veracruz (Mexico)

    2013-10-15

    This work presents the results of the seismic qualification tests applied to the fans that will be installed in the control panels of the three divisions of the diesel generators of the nuclear power plant (NPP) of Laguna Verde, Unit-1 and Unit-2. This seismic qualification process of the fans was carried out using two specimens that were tested in the seismic table (vibrating) of the Engineering Institute of Universidad Nacional Autonoma de Mexico (UNAM), in accordance with the requirements of the standard IEEE 344-1975, to satisfy the established requirements of seismic qualification in the technical specifications and normative documents required by the nuclear standards, in order to demonstrate its application in the diesel generators Divisions I, II and III of the NPP. The seismic qualification tests were developed on specimens that were retired of the NPP of Laguna Verde recently with a service life of 7.75 years. (Author)

  15. Using NJOY99 and MCNP4B2 to Estimate the Radiation Damage Displacements per Atom per Second in Steel Within the Boiling Water Reactor Core Shroud and Vessel Wall from Reactor-Grade Mixed-Oxide/Uranium Oxide Fuel for the Nuclear Power Plant at Laguna Verde, Veracruz, Mexico

    International Nuclear Information System (INIS)

    Vickers, Lisa

    2003-01-01

    The government of Mexico has expressed interest in utilizing the Laguna Verde boiling water reactor (BWR) nuclear power plant for the disposition of reprocessed spent uranium oxide (UOX) fuel in the form of reactor-grade mixed-oxide (MOX) fuel. MOX fuel would replace spent UOX fuel as a fraction in the core from 18 to 30% depending on the fuel loading cycle. MOX fuel is expected to increase the neutron fluence, flux, fuel centerline temperature, reactor core pressure, and yield higher energy neutrons.There is concern that a core with a fraction of MOX fuel (i.e., increased 239 Pu wt%) would increase the radiation damage displacements per atom per second (dpa-s -1 ) in steel within the core shroud and vessel wall as compared to only conventional, enriched UOX fuel in the core. The evaluation of radiation damage within the core shroud and vessel wall is a concern because of the potentially adverse affect to personnel and public safety, environment, and operating life of the reactor.The primary uniqueness of this paper is the computation of radiation damage (dpa-s -1 ) using NJOY99-processed cross sections for steel within the core shroud and vessel wall. Specifically, the unique radiation damage results are several orders of magnitude greater than results of previous works. In addition, the conclusion of this paper was that the addition of the maximum fraction of one-third MOX fuel to the LV1 BWR core did significantly increase the radiation damage in steel within the core shroud and vessel wall such that without mitigation of radiation damage by periodic thermal annealing or reduction in operating parameters such as neutron fluence, core temperature, and pressure, it posed a potentially adverse affect to the personnel and public safety, environment, and operating life of the reactor

  16. Early alert system for oscillations detection applied to the Central of Laguna Verde

    International Nuclear Information System (INIS)

    Calleros M, G.; Zapata Y, M.; Avila N, A.; Herrera H, S. F.

    2011-11-01

    The code Early Alert System developed by Engineering of the Reactor of the nuclear power plant of Laguna Verde is presented, showing its reliability like preventive and corrective instrument to external interferences to the reactor core, due to equipment malfunction associated to the typical systems of a nuclear power plant, as those that control the reactor pressure, those that feed water to the reactor, those that control the valves of the main turbine. With this purpose, real cases of application of the System are shown where the results are compared with the independent evaluations carried out by the supplier, observing compatibility in both results. The benefits of the logarithm are discussed in the nuclear industry as soon as in non nuclear ambits. (Author)

  17. Multi-disciplinary organization for the completion and start-up of the Laguna Verde-2 power reactor

    International Nuclear Information System (INIS)

    1995-01-01

    The optimization of the human and material resources for the pre-operational tests in the Laguna Verde-2 nuclear plant is described. About three thousand specialist of different groups were involved and each one had its own routines and functions with a complicated communication system among them. The optimization aimed at integrating and coordinating the organizational resources and defining the goals to be reached

  18. Training in fundamentals of radiological coverage in Laguna Verde NPP

    International Nuclear Information System (INIS)

    Lara H, M. A.

    2014-10-01

    In 2010, the Institute of Nuclear Power Operations (INPO) celebrates the Knowledge Transfer and Retention Workshop, an event where nuclear regulators and operators presented the strategies that various NPP to worldwide were implemented to mitigate the consequences of this generational change and take advantage of it, the trend in the presented works was the same: the generational change occurs in a faster way that the transfer of knowledge, the future was already here and many NPP had not been adequately prepared to train its nuclear technicians and engineers in the tasks demanded by the industry of them, so in addition to preparing these workers to forced marches was necessary to establish strategies to retain at more experienced staff in the industry. The Laguna Verde NPP has not been exempt to this process; the preparation of personnel squares to replace those that reaching retirement age in the Comision Federal de Electricidad (CFE) has become extensive in the last five years, sometimes leading to have personnel covering functions without an alternate to the next lower position, the cause? Not enough staff. In the specific case of radiation protection (Rp) the time required for obtaining the status of Rp technician according to the ANSI/ANS 3.1 standard is 2 years, one of the tasks that most occupies part of these two years is training in radiological coverage, this training requires a mix of knowledge and experience, recently one of the concepts used for training in Rp is the evaluation and management of the radiological risk, topic that is considered in this technical work. (Author)

  19. GRIP BARBADOS/CAPE VERDE RADIOSONDE V1

    Data.gov (United States)

    National Aeronautics and Space Administration — The GRIP Barbados/Cape Verde radiosonde data set consists of generally two soundings per day (06Z and 12Z) launched from Barbados, and one sounding per day (12Z)...

  20. New species of mayflies (Ephemeroptera) from Cape Verde

    Czech Academy of Sciences Publication Activity Database

    Soldán, Tomáš; Bojková, J.

    2015-01-01

    Roč. 3926, č. 4 (2015), s. 561-575 ISSN 1175-5326 Institutional support: RVO:60077344 Keywords : Cape Verde * Macaronesia * West Africa Subject RIV: EH - Ecology, Behaviour Impact factor: 0.994, year: 2015

  1. Impuestos verdes: una meta de equidad

    Directory of Open Access Journals (Sweden)

    Lilliana Arrieta Quesada

    2011-09-01

    Full Text Available Al considerar necesario incorporar a los grupos económicos en el gran proyecto de alcanzar metas de desarrollo sostenible, que surge como un nuevo paradigma al tomarse en consciencia por parte de los organismos internacionales, entre ellos las Naciones Unidas, de la necesidad de hacer un planteamiento de desarrollo económico diferente al convencional que considera aspectos ambientales y de equidad social, se admite por primera vez que la explotación de los recursos naturales y su transformación en materia prima y fuente energética, tiene límites, los cuales deben ser considerados en cualquier planteamiento serio de desarrollo económico.Es así como surge la tesis de los impuestos verdes como una opción que permita a los gobiernos incidir tanto en el mercado como en el sector industrial y en los hábitos de los consumidores.

  2. Verdes Mares: The Ideology of the Siren

    Directory of Open Access Journals (Sweden)

    Bruno Marinoni Marinoni

    2009-02-01

    Full Text Available The television channel number 10 of Fortaleza (current TV Verdes Mares, during the 1960 decade, passed through the ideological filter of the Military Dictatorship, when the channel was taken from its owner and given to the businessman Edson Queiroz. The filter had consequences in the next decade with the channel affiliation to the biggest network broadcasting of the country, the Rede Globo, which was also protected by the Military Regime. Based on those two facts, it is intended to discuss some aspects of the exploration models of communication that occurs in the country since the specified period, emphasizing the ideology transmitted by the TV channel which has the biggest audience ratings in Ceará.

  3. Leptospira interrogans in Rodents from Cape Verde.

    Science.gov (United States)

    Plata-Luis, Josué; Foronda, Pilar; Martín-Alonso, Aaron; Feliu, Carlos; Alves, Joana; Gil, Horacio; Valladares, Basilio

    2016-11-01

    Leptospirosis is an important worldwide zoonotic disease that can infect both animals and humans. In most cases, leptospirosis is a nonspecific self-limiting illness, but some patients can develop a severe form with a high mortality. This study was carried out in Santiago Island, Cape Verde, in 2012-2013. A total of 62 wild rodents (Rattus rattus and Mus domesticus) were analyzed. The lipL32 gene, present only in pathogenic Leptospira spp., was amplified by PCR, and 16 samples were positive (25.8%). In both rodent species, Leptospira interrogans was identified. The results show the presence of pathogenic Leptospira in the three localities analyzed in Santiago. The presence of L. interrogans demonstrates a serious health risk for the population, since this species has been associated with the most severe form of leptospirosis, the Weil's disease in humans, a severe infection with jaundice, renal failure, and hemorrhage.

  4. Mercadeo verde de una empresa dorada

    Directory of Open Access Journals (Sweden)

    Carlos Mario Uribe-Saldarriaga

    2014-01-01

    Full Text Available El caso presenta la campaña de mercadeo realizada por Ecopetrol entre 2009 y 2012 para la introducción en Colombia del diésel ultra bajo de azufre denominado diésel limpio. Se examina la campaña desde 2 puntos de vista: el primero, el posicionamiento de Ecopetrol como una de las empresas más admiradas de Colombia, tanto por sus resultados financieros como por sus actividades en la responsabilidad social empresarial; el segundo, desde las exigencias que se hacen al mercadeo ambiental en los países desarrollados, especialmente con respecto al lavado verde, teniendo en cuenta a la vez que Ecopetrol opera en un país en vía de desarrollo donde existe un menor avance en las exigencias ambientales hechas por los grupos de interés.

  5. Mercadeo verde de una empresa dorada

    Directory of Open Access Journals (Sweden)

    Carlos Mario Uribe-Saldarriaga

    2014-01-01

    Full Text Available El caso presenta la campa ̃ na de mercadeo realizada por Ecopetrol entre 2009 y 2012 para la introducción en Colombia del diésel ultra bajo de azufre denominado diésel limpio. Se examina la campa ̃ na desde 2 puntos de vista: el primero, el posicionamiento de Ecopetrol como una de las empresas más admiradas de Colombia, tanto por sus resultados financieros como por sus actividades en la responsabilidad social empresarial; el segundo, desde las exigencias que se hacen al mercadeo ambiental en los países desarro- llados, especialmente con respecto al lavado verde, teniendo en cuenta a la vez que Ecopetrol opera en un país en vía de desarrollo donde existe un menor avance en las exigencias ambientales hechas por los grupos de interés.

  6. First status report on regional groundwater flow modeling for the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Andrews, R.W.

    1984-12-01

    Regional groundwater flow within the principal hydrogeological units of the Palo Duro Basin is evaluated by developing a conceptual model of the flow regime in the shallow aquifers and the deep-basin brine aquifers and testing these models using a three-dimensional, finite-difference flow code. Semiquantitative sensitivity analysis (a limited parametric study) is conducted to define the system response to changes in hydrologic properties or boundary conditions. Adjoint sensitivity analysis is applied to the conceptualized flow regime in the Wolfcamp carbonate aquifer. All steps leading to the final results and conclusions are incorporated in this report. The available data utilized in this study are summarized. The specific conceptual models, defining the areal and vertical averaging of lithologic units, aquifer properties, fluid properties, and hydrologic boundary conditions, are described in detail. The results are delineated by the simulated potentiometric surfaces and tables summarizing areal and vertical boundary fluxes, Darcy velocities at specific points, and groundwater travel paths. Results from the adjoint sensitivity analysis included importance functions and sensitivity coefficients, using heads or the average Darcy velocities as the performance measures. The reported work is the first stage of an ongoing evaluation of two areas within the Palo Duro Basin as potantial repositories for high-level radioactive wastes. The results and conclusions should thus be considered preliminary and subject to modification with the collection of additional data. However, this report does provide a useful basis for describing the sensitivity and, to a lesser extent, the uncertainty of the present conceptualization of groundwater flow within the Palo Duro Basin

  7. Agrochemical characterization of vermicomposts produced from residues of Palo Santo (Bursera graveolens) essential oil extraction.

    Science.gov (United States)

    Carrión-Paladines, Vinicio; Fries, Andreas; Gómez-Muñoz, Beatriz; García-Ruiz, Roberto

    2016-12-01

    Fruits of Palo Santo (Bursera graveolens) are used for essential oil extraction. The extraction process is very efficient, because up to 3% of the fresh fruits can be transformed into essential oil; however, a considerable amount of waste is concurrently produced (>97% of the fresh biomass). Recent developments in Ecuadorian policies to foster environmentally friendly agroforestry and industrial practices have led to widespread interest in reusing the waste. This study evaluated the application of four vermicomposts (VMs), which are produced from the waste of the Palo Santo fruit distillation in combination with other raw materials (kitchen leftovers, pig manure, goat manure, and King Grass), for agrochemical use and for carbon (C) and nitrogen (N) decomposition in two soils with different textures. The results showed that the vermicompost mixtures (VMM) were valuable for agricultural utilisation, because total N (min. 2.63%) was relatively high and the C/N ratio (max. 13.3), as well as the lignin (max. 3.8%) and polyphenol (max. 1.6%) contents were low. In addition, N availability increased for both soil types after the application of the VMM. In contrast, N became immobile during decomposition if the VM of the pure waste was added. This likely occurred because of the relatively low total N (1.16%) content and high C/N ratio (35.0). However, the comparatively low C decomposition of this VM type makes its application highly recommendable as a strategy to increase the levels of organic matter and C, as well as for soil reclamation. Overall, these results suggest that the residues of the Palo Santo essential oil extraction are a potential source for vermicompost production and sustainable agriculture. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. AMIDO RESISTENTE EM FARINHAS DE BANANA VERDE

    Directory of Open Access Journals (Sweden)

    Dayana Portes RAMOS

    2010-03-01

    Full Text Available

    Este trabalho teve por objetivo avaliar o teor de amido resistente (AR em farinhas de banana verde produzidas a partir de treze genótipos de bananeira. Para a produção da farinha foram separadas a 1ª, 3ª e 5ª pencas de cada genótipo, na qual cada penca correspondeu a uma repetição. Os frutos de cada penca no estádio 1 (casca completamente verde de maturação foram descascados manualmente, cortados em fatias circulares de 0,5 cm e desidratados em estufa com circulação de ar a 40ºC por 48 horas, sendo em seguida moídos. A análise de AR consistiu em um processo enzimático, calculando-se o conteúdo final pela concentração de glicose liberada. Os resultados foram submetidos à análise estatística e mostraram diferenças significativas para o teor de AR nas farinhas obtidas dos genótipos de bananeira, sendo que a farinha com maior teor de AR foi a produzida a partir do cultivar ‘Nam’ (40,25% e a menor pelo híbrido ‘Fhia 01’ (10,01%. Pode-se concluir que o conteúdo de AR varia em relação ao genótipo utilizado para a confecção da farinha e que a banana pode ser uma boa opção de estudo de alimento funcional.

  9. Verde Macael: A Serpentinite Wrongly Referred to as a Marble

    OpenAIRE

    Navarro, Rafael; Pereira, Dolores; Gimeno, Ana; Barrio, Santiago

    2013-01-01

    Serpentinites are used in both exterior and interior locations, but not all serpentinites are equal: they vary in physical-mechanical behavior and are not all suitable for similar uses. The serpentinites most commonly used worldwide come from India, Pakistan or Egypt. Spain has traditionally quarried two ultramafic massifs, one in Galicia (Verde Pirineos) and one in Andalucía (Verde Macael). Some of these quarries were small family-run businesses. In both cases, these rocks are commercially a...

  10. Geostatistical analysis of potentiometric data in Wolfcamp aquifer of the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Harper, W.V.; Furr, J.M.

    1986-04-01

    This report details a geostatistical analysis of potentiometric data from the Wolfcamp aquifer in the Palo Duro Basin, Texas. Such an analysis is a part of an overall uncertainty analysis for a high-level waste repository in salt. Both an expected potentiometric surface and the associated standard error surface are produced. The Wolfcamp data are found to be well explained by a linear trend with a superimposed spherical semivariogram. A cross-validation of the analysis confirms this. In addition, the cross-validation provides a point-by-point check to test for possible anomalous data

  11. Perspectives of the central Laguna Verde after Fukushima for the period 2012 at the 2015 in operation and maintenance; Perspectivas de la central Laguna Verde despues de Fukushima para el periodo 2012 al 2015 en operacion y mantenimiento

    Energy Technology Data Exchange (ETDEWEB)

    Rivera C, A., E-mail: arr99999@cfe.gob.mx [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Carretera Cardel-Nautla Km 42.5, Veracruz (Mexico)

    2012-10-15

    The Nuclear Power Plants Management of the Federal Commission of Electricity in Mexico by means an internal analysis confronts the threat to the nuclear industry of the event of Fukushima that affected the public opinion, and the emission of new regulations. This situation demands to improve the results of the operation and maintenance of the nuclear power plant of Laguna Verde, to contribute value with their excellence in the acting to the nuclear option in Mexico. The internal analysis defined with clarity the perspectives based on weaknesses and strengths of the operation (monitoring and control of on-line parameters), and in the maintenance (sustained by the planning), enriched with the external experiences emitted by the institutes INPO and WANO for the nuclear industry, with all this strategic objectives 2012 to 2015 were presented and the initiatives as the extension of the useful life to 20 years more, as well as the focused actions to diminish the threat that the event of Fukushima influenced negatively in the public opinion, by means the diffusion of the good results that can be obtained in the nuclear power plant of Laguna Verde between 2012 and 2015, taking advantage of its modernized power of 810 MW-hour for each generating unit, doing visible that the Project of Extended Power Increase is a generation reality of 120% of the original value, to be able to enter at the excellence levels of the nuclear world. (Author)

  12. Radiological survey of the low-level radioactive waste burial site at the Palos Forest Preserve, Illinois

    International Nuclear Information System (INIS)

    Hayes, K.A.

    1982-01-01

    Two landfill sites containing low-level radioactive waste material, Site A and Plot M, are located 14 miles southwest of Chicago, Illinois in the Palos Forest Preserve. Site A is the former location of the Argonne National Laboratory. Buried at Site A in 1956 were the dismantled reactor shells, building walls, and cooling towers from three of the world's first nuclear reactors. Plot M was used from 1943 to 1949 for burial of low-level radioactive wastes derived from Site A operations and from the University of Chicago Metallurgical Laboratory. Tritiated water was detected in 1973 in some of the Forest Preserve picnic wells located 500 to 1000 yards north of Plot M. An extensive surveillance program was initiated in 1976 to: (1) study the elevated tritium content of some picnic wells and its observed seasonal fluctuations, (2) establish if other radionuclides buried in Plot M or remaining at Site A have migrated, (3) establish the rate of groundwater movement in the glacial till and underlying dolomite aquifer, (4) determine the tritium content of the till and aquifer, and (5) predict future tritium levels in the well water. Several test wells were installed in the soil and dolomite bedrock to monitor radioactivity in groundwater, measure water levels, and provide other geohydrological information. Tritium has migrated from the Plot M burial trenches into the surrounding drift. The tritium plume, the contaminated zone in the drift in which tritium concentrations exceed 10 nanocuries per liter of water (nCi/L), has migrated at least 165 feet horizontally northward and 130 feet vertically downward to the bedrock surface. Small amounts of other radionuclides - uranium, plutonium, and strontium-90 - have been found in boreholes beneath the concrete cap covering Plot M, but not in the subsoil outside of the Plot. The radionuclide concentrations found to date are too low to result in any measureable radiation exposure to the public

  13. Perspectives of the central Laguna Verde after Fukushima for the period 2012 at the 2015 in operation and maintenance

    International Nuclear Information System (INIS)

    Rivera C, A.

    2012-10-01

    The Nuclear Power Plants Management of the Federal Commission of Electricity in Mexico by means an internal analysis confronts the threat to the nuclear industry of the event of Fukushima that affected the public opinion, and the emission of new regulations. This situation demands to improve the results of the operation and maintenance of the nuclear power plant of Laguna Verde, to contribute value with their excellence in the acting to the nuclear option in Mexico. The internal analysis defined with clarity the perspectives based on weaknesses and strengths of the operation (monitoring and control of on-line parameters), and in the maintenance (sustained by the planning), enriched with the external experiences emitted by the institutes INPO and WANO for the nuclear industry, with all this strategic objectives 2012 to 2015 were presented and the initiatives as the extension of the useful life to 20 years more, as well as the focused actions to diminish the threat that the event of Fukushima influenced negatively in the public opinion, by means the diffusion of the good results that can be obtained in the nuclear power plant of Laguna Verde between 2012 and 2015, taking advantage of its modernized power of 810 MW-hour for each generating unit, doing visible that the Project of Extended Power Increase is a generation reality of 120% of the original value, to be able to enter at the excellence levels of the nuclear world. (Author)

  14. Turbine model for the Laguna Verde nucleo electric central based in the RELAP code

    International Nuclear Information System (INIS)

    Cortes M, F.S.; Ramos P, J.C.; Salazar S, E.; Chavez M, C.

    2003-01-01

    The Nuclear Power stations as Laguna Verde occupy at the present time a place every time but important as non pollutant alternative, economic and trusty to generate electricity. It is for it that the Group of Nuclear Engineering of the Engineering Faculty (GrlNFI) of the National Autonomous University of Mexico (UNAM) it develops investigation projects applied to Nuclear Centrals. One of the projects in process is the development of a Classroom simulator, which it can configures to consent to diverse models of nuclear systems with training purposes in normal operation, or, to consent to specialized nuclear codes for the analysis of transitory events and have a severe accident. This work describes the development, implementation and it proves of a simplified model of the Main turbine to be integrated to the group of models of the Classroom simulator. It is part of the current effort of GrlNFI guided to obtain a representation of all the dynamic models necessary to simulate the Plant Balance of the Laguna Verde Central. It is included the development of the unfolding graphic which represent the modeling of the Main turbine, and of the control interface that allows the user to manipulate in simple way, direct and interactive this device during the training or the analysis. With this work it is wanted to contribute to the training of new technicians and to support the operation personnel of the Centrals. Also, the developed infrastructure is guided to contribute in the design and analysis of new Nuclear Power stations with the contribution of new computational tools for the visualization, simulation and process control. (Author)

  15. Ouro Verde MG 2: nova cultivar de mungo-verde para Minas Gerais Ouro Verde MG 2: new mungbean cultivar for Minas Gerais State, Brazil

    Directory of Open Access Journals (Sweden)

    Rogério F. Vieira

    2002-03-01

    Full Text Available Dentre várias linhagens introduzidas do "Asian Vegetable Research and Development Center" (AVRDC, sobressaiu a linhagem VC 3984-B-2-B-4-1-B, que recebeu o nome de Ouro Verde MG 2. Suas sementes são verde-brilhantes e o peso de 1000 unidades varia de 43 a 51 g. O início da floração ocorre em torno de 33 dias após a emergência e a primeira vagem madura surge entre 23 e 33 dias. Por se tratar de espécie de maturação desuniforme, podem ser necessárias duas a quatro colheitas. As plantas podem atingir 95 cm de altura. As vagens são marrom-escuras e concentram-se na parte superior da planta. É suscetível a duas doenças que geralmente aparecem no final do ciclo de vida do mungo-verde: míldio-pulverulento (Erysiphe polygoni e mancha-foliar-de-cercospora (Cercospora canescens. A 'Ouro Verde MG 2' é resistente ao acamamento, e o seu rendimento, em três ensaios instalados em dezembro, janeiro e fevereiro, variou de 1,5 a 2,0 t/ha. Esses rendimentos foram, em média, 12% superior ao da cultivar Ouro Verde.Among many accessions introduced from Asian Vegetable Research and Development Center (AVRDC, the VC 3984-B-2-B-4-1-B stood out and was named 'Ouro Verde MG 2'. The seeds are bright green and 1000-seed weight ranges from 43 to 51 g. Flowering starts approximately 33 days after emergence and the first pod ripens between 23 and 33 days later. As mungbean is a non-uniform maturation species, two to four harvests could be necessary. The plant can reach 95 cm high. The pods are dark brown and concentrated in the upper canopy. This cv. is susceptible to two diseases which generally appear late in the crop: powdery mildew (Erysiphe polygoni and cercospora leaf spot (Cercospora canescens. 'Ouro Verde MG 2' is resistant to lodging. The yield measured in three experiments carried out in December, January, and February, ranged from 1.5 to 2.0 t/ha. In average, these yields were 12% superior than the achieved by the cultivar 'Ouro Verde'.

  16. Multispectral image analysis of the Palo Duro Basin, Texas: Final report

    International Nuclear Information System (INIS)

    Andre, C.G.

    1986-09-01

    The objectives of this remote sensing study of the Palo Duro Basin are to: (1) detect the surface expression of regional subsurface structure; (2) locate previously unrecognized fractures; (3) interpret the data in terms of the geologic history of the Palo Duro Basin. Linear and circular surface features were mapped from Landsat 4 Thematic Mapper and NOAA-7 Advanced Very High Resolution Radiometer digital images of visible, near-infrared and thermal infrared bands. The density and orientation of features mapped are shown to be related to geological features, such as faults, structural arches, paleoerosion topography and salt dissolution zones. The approximate area covered by the three 185 km /times/ 170 km Thematic Mapper images studied extends southward from the Canadian River Breaks to the Sand Hills and eastward from the western Mountains in Oklahoma. The day and night thermal infrared images from the NOAA-7 satellite encompass an area that includes the northern half of Texas and most of the surrounding states to the east, west and north. 4 refs

  17. Second status report on regional ground-water flow modeling for the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    1986-07-01

    Regional ground-water flow within the principal geohydrologic units of the Palo Duro Basin is evaluated by developing a conceptual model of the flow regime and testing the model using a three-dimensional, finite-difference flow code. Sensitivity analyses (a limited parametric study) are conducted to define the system responses to changes in the conceptual model. Of particular interest are the impacts of salt permeability and potential climatic changes on the system response. The conceptual model is described in terms of its areal and vertical discretization, aquifer properties, fluid properties and hydrologic boundary conditions. The simulated ground-water flow fields are described with potentiometric surfaces, tables summarizing the areal and vertical volumetric flows through the principal units, and Darcy velocities within specified finite-difference blocks. The reported work is the second stage of an ongoing evaluation of the Palo Duro Basin as a potential repository for high-level radioactive wastes. The results and conclusions should thus be considered preliminary and subject to modification with the collection of additional data. However, the report does provide a useful basis for describing the sensitivity of the present conceptualization of ground-water flow to particular parameters and, to a lesser extent, the uncertainties in the present conceptualization. 28 refs., 44 figs., 13 tabs

  18. Surface hydrologic characteristics of proposed repository locations in the Palo Duro Basin of the Texas Panhandle

    International Nuclear Information System (INIS)

    1985-04-01

    This report provides a description of the surface hydrology in the two proposed locations of a high-level waste repository within the Palo Duro Basin of the Texas Panhandle. Included for consideration are the topography; the major drainage systems - Palo Duro, Tierra Blanca, and Tule Creeks, and Prairie Dog Town Fork of the Red River; and the most prominent impoundments, the playa lakes. The magnitude and frequency of precipitation throughout the region are discussed, and rainfall depth-duration-area data for the 100-year, 500-year, and probable maximum storms are presented. Soil properties are also described, with specific reference to the infiltration and runoff processes and the contribution of these processes to Ogallala aquifer recharge. A summary discussion of the local streams includes information on historical streamflow, a brief description of flooding, and results of a study of floodplains for the 100-year, 500-year, and probable maximum storms. The report concludes with a characterization of the water quality of these streams and an explanation of the local geologic influences on stream-water chemistry. 25 figures, 20 tables

  19. Validation of the thermal balance of Laguna Verde turbine under conditions of extended power increase

    International Nuclear Information System (INIS)

    Castaneda G, M. A.; Cruz B, H. J.; Mercado V, J. J.; Cardenas J, J. B.; Garcia de la C, F. M.

    2012-10-01

    The present work is a continuation of the task: Modeling of the vapor cycle of Laguna Verde with the PEPSE code to conditions of thermal power licensed at present (2027 MWt) in which the modeling of the vapor cycle of the nuclear power plant of Laguna Verde was realized with PEPSE code (Performance Evaluation of Power System Efficiencies). Once reached the conditions of nominal operation of extended power increase, operating both units to 2371 MWt; after the tests phase of starting-up and operation is necessary to carry out a verification of the proposed design of the vapor cycle for the new operation conditions. All this, having in consideration that the vapor cycle designer only knows the detail of the prospective performance of the main turbine, for all the other components (for example pumps, heat inter changers, valves, reactor, humidity separators and re-heaters, condensers, etc.) makes generic suppositions based on engineering judgment. This way carries out the calculations of thermal balance to determine the guaranteed gross power. The purpose of the present work is to comment the detail of the validation carried out of the specific thermal balance (thermal kit) of the nuclear power plant, making use of the design characteristics of the different components that conform the vapor cycle. (Author)

  20. NPDES Permit for Mesa Verde National Park Wastewater Treatment Facility in Colorado

    Science.gov (United States)

    Under NPDES permit number CO-0034398, the United States Department of the Interior, National Park Service, Mesa Verde National Park is authorized to discharge from the Mesa Verde National Park wastewater treatment plant, in Montezuma County, Colo.

  1. Agrochemical characterization of vermicomposts produced from residues of Palo Santo (Bursera graveolens) essential oil extraction

    DEFF Research Database (Denmark)

    Carrión-Paladines, Vinicio; Fries, Andreas; Gomez Muñoz, Beatriz

    2016-01-01

    Fruits of Palo Santo (Bursera graveolens) are used for essential oil extraction. The extraction process is very efficient, because up to 3% of the fresh fruits can be transformed into essential oil; however, a considerable amount of waste is concurrently produced (>97% of the fresh biomass). Rece...

  2. Summer sound-level characterization of the Deaf Smith County and Swisher County locations in the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    1984-03-01

    A description of sound levels and sound sources in the Deaf Smith County and Swisher County locations in the Palo Duro Basin during a period representative of the summer season is presented. Included are data collected during the period August 4 through 8, 1982, for both locations. 3 references, 2 figures, 3 tables

  3. Winter sound-level characterization of the Deaf Smith County location in the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    1984-03-01

    A description of sound levels and sound sources in the Deaf Smith County location in the Palo Duro Basin during a period representative of the winter season is presented. Data were collected during the period February 26 through March 1, 1983. 4 references, 1 figure, 3 tables

  4. Participation of the ININ in the external radiological emergency plan of the Laguna Verde power plant; Participacion del ININ en el plan de emergencia radiologica externo de la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Martinez S, R; Cervini L, A [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    1991-07-01

    The planning of performances in radiological emergencies, with the object of reducing the consequences as much as possible on the population to accidental liberations of radioactive material coming from Nuclear power plant, it has been of main interest in the nuclear community in the world. In Mexico it has not been the exception, since with the setting in march of the Laguna Verde nuclear power plant exists an executive program of planning for emergencies that it outlines the activities to follow trending to mitigate the consequences that are derived of this emergency. As integral part of this program this the External Plan of Radiological Emergency (PERE) that covers the emergencies that could leave the frontiers of the Laguna Verde power plant. In the PERE it settles down the planning, address and control of the preparation activities, response and recovery in emergencies, as well as the organization and coordination of the institutions that participate. The National Institute of Nuclear Research (ININ), like integral part of these institutions in the PERE, has an infrastructure that it allows to participate in the plan in a direct way in the activities of 'Control of the radiological exhibition the response personnel and control of water and foods' and of support way and consultant ship in the activities of 'Monitoring, Classification and decontamination of having evaluated' and 'Specialized medical radiological attention'. At the moment the ININ has a radiological mobile unit and this conditioning a second mobile unit to carry out part of the activities before mentioned; also accounts with 48 properly qualified people that directly intervene in the plan. In order to guarantee an adequate response in the PERE an organization it has been structured like that of the annex as for the personnel, transport, team, procedures and communication system, with the objective always of guaranteeing the security and the population's health in emergency situations in the

  5. Strategic planning 2007-2011, an opportunity for quality, competitiveness and excellence of the Laguna Verde Central; Planeacion estrategica 2007-2011, una oportunidad para la calidad, competitividad y excelencia de la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Rivera C, A. [CFE, Central Laguna Verde, Kilometro 42.5 Cardel Nautla, Veracruz (Mexico)]. e-mail: arr99999@cfe.gob.mx

    2007-07-01

    The reason is to give to know to the nuclear community in Mexico the good results that it located in the 2006 to the Laguna Verde Nucleo electric Central in the classification of the World Association of Nuclear Operators (WANO) like one of the best in the worldwide scale, and their Strategic Plan 2007-2011 like an opportunity to continue improving the Quality, the Competitiveness and the Excellency in their Generating Units. It stands out that the fuel reloads are carried out in systemic form in less than 30 days, and also other achievements like it is the certificate granted by PROFEPA of Clean Industry, the renovation of the Certifications of the ISO-9001 and the ISO-14001, as well as the accredit of the Laboratories, and they will give data of the project of the increment of power that their power rose in 15%. For those results in the Strategic Planning 2007-2011 are pointed out that the Laguna Verde Central is a highly viable option in Mexico, when continuing with reloads that will allow a capacity factor up of 90%, and the other concepts that will give the obtaining of the qualification level 1 of WANO in this strategic period. Finally I will conclude with the good news for the Nuclear Industry in Mexico that published the Reforma newspaper at November 01, 2006: 'To the president of Mexico, Felipe Calderon, interests him to impel during his command the alternating energy sources to the hydrocarbons, known it is that the hydrocarbons (petroleum, coal or natural gas) they are finite, while the appetite of the world for the energy is infinite. As you they know, Mexico possesses a nuclear plant that generates energy starting from enriched uranium: the famous Laguna Verde Thermonuclear Central. He declared that Mexico can and it should advance for the one on the way to the energy generation for the nuclear road.' (Author)0.

  6. El anillo verde de Vitoria-Gasteiz

    Directory of Open Access Journals (Sweden)

    Marañón, Blanca

    2001-10-01

    de la periferia de la ciudad, donde coexistían zonas de alto valor ecológico sometidas a agresiones de todo tipo, con otros espacios degradados y marginales, fruto de la expansión urbana e industrial. La restauración ecológico-paisajística de estos espacios y su acondicionamiento para el uso público han permitido configurar un "anillo verde multifunción" en torno a la ciudad que está proporcionando importantes beneficios ambientales, sociales y económicos. El anillo verde ha jugado un papel importante en la integración naturaleza-ciudad, equilibrando la oferta de zonas verdes entre todos los barrios y favoreciendo la conexión entre los espacios verdes urbanos y los espacios naturales del entorno agrícola. Ha propiciado, asimismo, el desarrollo de nuevas actividades relacionadas con el ocio y el esparcimiento y con la formación, educación y sensibilización ambiental; actividades que, por un lado, están suponiendo un revulsivo para el sector empresarial ambiental y la integración socio-laboral de determinados colectivos sociales y, por otro, contribuyen a la conservación de estos espacios, al convertirse los usuarios en sus mayores defensores y guardianes. La utilización de algunos de estos espacios como superficies de laminación de agua en épocas de avenidas para solventar problemas de inundación en las zonas industriales es otro ejemplo del valor añadido obtenido al plantear soluciones integrales. Los excelentes resultados obtenidos tras nueve años de trabajo demuestran la viabilidad técnica y económica y la rentabilidad social de este proyecto, que representa una prueba evidente de la decidida voluntad municipal de avanzar hacia un modelo de ciudad sostenible en armonía con el medio natural que la rodea.

  7. El deslizamiento de Palo Alto, Turrialba, Costa Rica : apuntes para su estudio

    Directory of Open Access Journals (Sweden)

    Peraldo Huertas, Giovanni

    2015-12-01

    Full Text Available En este trabajo se busca caracterizar, desde un punto de vista geomorfológico y geológico, el deslizamiento de Palo Alto, en el contexto de los megaprocesos de inestabilidad de laderas presentes en las laderas del río Reventazón. El corredor del río Reventazón, entre Turrialba y Siquirres, muestra una serie de procesos complejos de remoción en masa, que generan morfologías típicas de procesos de deslizamiento, tan continuas que dan una apariencia morfológica caótica, donde es difícil definir patrones de movimiento del terreno. El área de inestabilidad de Palo Alto se reconoce fácilmente incluso en el mapa topográfico correspondiente a escala 1:50 000, pues muestra una típica forma en herradura. Los límites del deslizamiento están bien marcados mediante escarpes bien definidos en campo, pero los extremos de las coronas laterales hacia el oeste se desdibujan debido, entre otras cosas, a que en esos sectores queda indefinido el límite al norte con el área de inestabilidad compleja de Bonilla y al sur con el área similar de Guayabo - Lajas. Se efectuó una fotointerpretación del área de estudio, mediante la revisión de fotos aéreas de la línea de vuelo Orosi-Pejibaye, escala 1:20 000 del año 1988, así como fotografías aéreas del proyecto Terra 1998, con el fin de observar posibles cambios en los procesos erosivos, así como en la forma del deslizamiento. Posteriormente, se realizó trabajo de campo para revisar la morfología fotointerpretada, analizar la conformación geológica a nivel de litología y estructura y así afinar la interpretación final de la geomorfología del área inestable de Palo Alto. Desde un punto de vista geológico, el área de estudio está compuesta por rocas sedimentarias del Neógeno, tales como la Fm. Uscari (Mioceno y las formaciones Suretka y Fm. Doán (Plioceno; además de aglomerados que posiblemente se relacionan al volcanismo holoceno de la cordillera volcánica Central. Mediante an

  8. 75 FR 47808 - Verde Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13819-000] Verde Hydro, LLC... Intervene, and Competing Applications August 2, 2010. On July 21, 2010, Verde Hydro, LLC filed an... the feasibility of the Verde Hydroelectric Project, located in Maricopa County, in the State of...

  9. 77 FR 9974 - Notice of Entering Into a Compact With the Republic of Cape Verde

    Science.gov (United States)

    2012-02-21

    ... Republic of Cape Verde AGENCY: Millennium Challenge Corporation. ACTION: Notice. SUMMARY: In accordance..., and the Republic of Cape Verde. Representatives of the United States Government and the Republic of Cape Verde executed the Compact documents on February 10, 2012. Dated: February 14, 2012. Melvin F...

  10. Strategic planning 2007-2011, an opportunity for quality, competitiveness and excellence of the Laguna Verde Central

    International Nuclear Information System (INIS)

    Rivera C, A.

    2007-01-01

    The reason is to give to know to the nuclear community in Mexico the good results that it located in the 2006 to the Laguna Verde Nucleo electric Central in the classification of the World Association of Nuclear Operators (WANO) like one of the best in the worldwide scale, and their Strategic Plan 2007-2011 like an opportunity to continue improving the Quality, the Competitiveness and the Excellency in their Generating Units. It stands out that the fuel reloads are carried out in systemic form in less than 30 days, and also other achievements like it is the certificate granted by PROFEPA of Clean Industry, the renovation of the Certifications of the ISO-9001 and the ISO-14001, as well as the accredit of the Laboratories, and they will give data of the project of the increment of power that their power rose in 15%. For those results in the Strategic Planning 2007-2011 are pointed out that the Laguna Verde Central is a highly viable option in Mexico, when continuing with reloads that will allow a capacity factor up of 90%, and the other concepts that will give the obtaining of the qualification level 1 of WANO in this strategic period. Finally I will conclude with the good news for the Nuclear Industry in Mexico that published the Reforma newspaper at November 01, 2006: 'To the president of Mexico, Felipe Calderon, interests him to impel during his command the alternating energy sources to the hydrocarbons, known it is that the hydrocarbons (petroleum, coal or natural gas) they are finite, while the appetite of the world for the energy is infinite. As you they know, Mexico possesses a nuclear plant that generates energy starting from enriched uranium: the famous Laguna Verde Thermonuclear Central. He declared that Mexico can and it should advance for the one on the way to the energy generation for the nuclear road.' (Author)

  11. Influence of geological factors on the mechanical properties of rock in the Palo Duro Basin

    International Nuclear Information System (INIS)

    Cregger, D.M.; Corkum, D.H.; Gokce, A.O.; Peck, J.H.

    1985-01-01

    Sedimentary formations in the Palo Duro Basin of the Texas Panhandle exhibit a variety of petrofabrics which contribute to different mechanical behavior. Similarly classified rock core specimens, upon closer inspection, are comprised of different textures and slight compositional variations. The resultant rock mass characteristics interpreted from laboratory tests and deep borehole geophysical logs are seen to be a direct result of the depositional environment and geologic history. Depositional environments include chemical precipitation in shallow brine pools, basin filling with terrigenous or eolian supply of clastics, restricted circulation, and transgression of normal marine waters. Geochemical transformations of the deposits, (diagenesis), can or may result in profound changes to the mechanical properties of the rock. Structural deformation of the bedded salts is slight and may be far less important in its effect on mechanical properties than diagenetic changes

  12. Interpretation of seismic reflection data, Central Palo Duro Basin: Technical report

    International Nuclear Information System (INIS)

    1986-11-01

    Seismic reflection data from the Central Palo Duro Basin, Texas, were studied to identify and characterize geologic structure, potential hydrocarbon traps, and anomalies suggesting adverse features such as salt dissolution or diapirism. The data included seismic reflection data, geologic and geophysical data controlled by Stone and Webster Engineering Corporation, and data from the literature. These data comprised approximately 590 line-mi of seismic profiles over approximately 4000 mi 2 , plus well logs from 308 wells. The study addressed the section from shallow reflectors down to basement. Structural contour maps were prepared for the Upper San Andres, Near Top of Glorieta, Wolfcamp, and Precambrian horizons. Isopach maps were prepared for intervals between the Upper and Lower San Andres and between the Upper San Andres and the Wolfcamp. Interpretation indicates southeasterly dips in the northwest part of the mapped area and southwesterly dips in the southwest part. Geologic structures show a generally northwest alignment. Faults at the Precambrian level and geologic structures show a generally northwest alignment. Faulting in the area is largely limited to the Precambrian, but interpretation is uncertain. Evidence of post-Wolfcampian faulting is not recognized. Seismic data delineating the San Andres section indicate a stable section throughout the area. Anomalous reflection events possibly associated with subsurface salt dissolution were seen at the 800- to 1200-ft level in Swisher County. Other anomalies include an overthickened zone northwest of Westway and carbonate buildup in the Wolfcamp and Pennsylvanian in Randall County. Mississippian to Middle Pennsylvanian diastrophism resulting in the Amarillo Uplift and Matador Arch is not manifested structurally in the central Palo Duro Basin. Subsidence or gentle uplift contributed to some structural deformation

  13. Una nueva ultraestructura de ópalo CT en silcretas. Posible indicador de influencia bacteriana

    Directory of Open Access Journals (Sweden)

    Bustillo, Mª A.

    1995-04-01

    Full Text Available Electron microscope observations of opaline silcretes found in the playa of a Miocene shallow lake reveal new opal CT microstructures. These microstructures are made up of fibres, filaments or rods, which are formed, in tum by coalesced microspheres or microhemispheres (0,1-0,2 µ diameter. They are up to 10 µ in length although larger ones could exist. They are straight, bent, wavy or even hairpin shaped. These microstructures comprise part of the opaline mass of the silcretes and are very similar to both neogenic opaline structures which are formed by bacterial intluence and to silicified biofilms. Therefore microbial mediation could exist in the genesis of this opal CT, although a possible inorganic origin by silicification of sepiolite is also considered.Un estudio mediante MEB de silcretas miocenas opalinas formadas por silicificación de playas en un ambiente de «playa-lake» pone de manifiesto la existencia de una nueva microestructura de ópalo CT. Esta microestructura denominada en general fibrosa, se manifiesta por la presencia de multitud de fibras, filamentos o varillas formadas por la alineación de microesferas o microhemisferas que presentan un diámetro entre 0,1 y 0,2 µ. Las fibras, filamentos o varillas tienen formas variables: rectas, curvadas, onduladas y «en horquilla», y presentan longitudes de hasta 10 µ, aunque podrían existir longitudes mayores. La disposición organizada de las microesferas en filamentos o fibras, constituyendo la masa general del ópalo, y su parecido con microestructuras opalinas que han sido formadas por influencia bacteriana, hacen considerar esta hipótesis, aunque no se puede descartar totalmente un origen inorgánico por silicificación de sepiolita.

  14. Simulation of overpressure events with a Laguna Verde model for the RELAP code to conditions of extended power up rate

    International Nuclear Information System (INIS)

    Rodriguez H, A.; Araiza M, E.; Fuentes M, L.; Ortiz V, J.

    2012-10-01

    In this work the main results of the simulation of overpressure events are presented using a model of the nuclear power plant of Laguna Verde developed for the RELAP/SCDAPSIM code. As starting point we have the conformation of a Laguna Verde model that represents a stationary state to similar conditions to the operation of the power station with Extended Power Up rate (EPU). The transitory of simulated pressure are compared with those documented in the Final Safety Analysis Report of Laguna Verde (FSAR). The results of the turbine shot transitory with and without by-pass of the main turbine are showed, and the event of closes of all the valves of main vapor isolation. A preliminary simulation was made and with base in the results some adjustments were made for the operation with EPU, taking into account the Operation Technical Specifications of the power station. The results of the final simulations were compared and analyzed with the content in the FSAR. The response of the power station to the transitory, reflected in the model for RELAP, was satisfactory. Finally, comments about the improvement of the model are included, for example, the response time of the protection and mitigation systems of the power station. (Author)

  15. Clima, cultura y disponibilidad de espacios verdes urbanos

    OpenAIRE

    Sierra, Eduardo Mario; Pérez, Silvia Patricia; Nizzero, Gustavo Raúl

    2002-01-01

    p.165-171 El rápido crecimiento urbano mundial hace que la calidad de vida dependa cada vez más de la disponibilidad de espacios verdes. Este trabajo trata de relacionar la disponibilidad de espacios verdes urbanos públicos con los factores climáticos y culturales. Las ciudades del Hemisferio Norte en países de cultura europea, donde se llevan a cabo programas de sustentabilidad muestran mayores disponibilidades lo cual refleja el impacto de los factores culturales. Desde el punto de vista...

  16. Strategic Analysis for the MER Cape Verde Approach

    Science.gov (United States)

    Gaines, Daniel; Belluta, Paolo; Herman, Jennifer; Hwang, Pauline; Mukai, Ryan; Porter, Dan; Jones, Byron; Wood, Eric; Grotzinger, John; Edgar, Lauren; hide

    2009-01-01

    The Mars Exploration Rover Opportunity has recently completed a two year campaign studying Victoria Crater. The campaign culminated in a close approach of Cape Verde in order to acquire high resolution imagery of the exposed stratigraphy in the cliff face. The close approach to Cape Verde provided significant challenges for every subsystem of the rover as the rover needed to traverse difficult, uncharacterised terrain and approach a cliff face with the potential of blocking out solar energy and communications with Earth. In this paper we describe the strategic analyses performed by the science and engineering teams so that we could successfully achieve the science objectives while keeping the rover safe.

  17. Estimation of fast neutron fluence in steel specimens type Laguna Verde in TRIGA Mark III reactor

    International Nuclear Information System (INIS)

    Galicia A, J.; Francois L, J. L.; Aguilar H, F.

    2015-09-01

    The main purpose of this work is to obtain the fluence of fast neutrons recorded within four specimens of carbon steel, similar to the material having the vessels of the BWR reactors of the nuclear power plant of Laguna Verde when subjected to neutron flux in a experimental facility of the TRIGA Mark III reactor, calculating an irradiation time to age the material so accelerated. For the calculation of the neutron flux in the specimens was used the Monte Carlo code MCNP5. In an initial stage, three sheets of natural molybdenum and molybdenum trioxide (MoO 3 ) were incorporated into a model developed of the TRIGA reactor operating at 1 M Wth, to calculate the resulting activity by setting a certain time of irradiation. The results obtained were compared with experimentally measured activities in these same materials to validate the calculated neutron flux in the model used. Subsequently, the fast neutron flux received by the steel specimens to incorporate them in the experimental facility E-16 of the reactor core model operating at nominal maximum power in steady-state was calculated, already from these calculations the irradiation time required was obtained for values of the neutron flux in the range of 10 18 n/cm 2 , which is estimated for the case of Laguna Verde after 32 years of effective operation at maximum power. (Author)

  18. Modernization and power increase nuclear power plant Laguna Verde (Mexico)

    International Nuclear Information System (INIS)

    Garcia-Serrano, J. L.; Merino, A.; Ruiz Gutierrez, L.

    2011-01-01

    The objective of this project is to perform the modifications on the thermal cycle of the plant required by an Extended Power Uprate, to achieve a safe and reliable operation of the plant at 120% of its original thermal power. The scope includes the design, engineering training, supply of equipment, dismantling, installation, testing and commissioning. The duration of the project is 4 years (82007-2010), and all the modifications have been implemented in four outages, two per unit. The main modification carried out are the change of the condenser, moisture separator and main steam reheaters, the feedwater haters, the turbogenerator and its auxiliaries, transformers, isolated phase bus and main circuit breaker, etc. (Author)

  19. Thermal limits validation of gamma thermometer power adaption in CFE Laguna Verde 2 reactor core

    Energy Technology Data Exchange (ETDEWEB)

    Cuevas V, G.; Banfield, J. [GE-Hitachi Nuclear Energy Americas LLC, Global Nuclear Fuel, Americas LLC, 3901 Castle Hayne Road, Wilmingtonm, North Carolina (United States); Avila N, A., E-mail: Gabriel.Cuevas-Vivas@ge.com [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Carretera Cardel-Nautla Km 42.5, Alto Lucero, Veracruz (Mexico)

    2016-09-15

    This paper presents the status of GEH work on Gamma Thermometer (GT) validation using the signals of the instruments installed in the Laguna Verde Unit 2 reactor core. The long-standing technical collaboration between Comision Federal de Electricidad (CFE), Global Nuclear Fuel - Americas LLC (GNF) and GE-Hitachi Nuclear Energy Americas LLC (GEH) is moving forward with solid steps to a final implementation of GTs in a nuclear reactor core. Each GT is integrated into a slightly modified Local Power Range Monitor (LPRM) assembly. Six instrumentation strings are equipped with two gamma field detectors for a total of twenty-four bundles whose calculated powers are adapted to the instrumentation readings in addition to their use as calibration instruments for LPRMs. Since November 2007, the six GT instrumentation strings have been operable with almost no degradation by the strong neutron and gamma fluxes in the Laguna Verde Unit 2 reactor core. In this paper, the thermal limits, Critical Power Ratio (CPR) and maximum Linear Heat Generation Rate (LHGR), of bundles directly monitored by either Traverse In-core Probes (TIPs) or GTs are used to establish validation results that confirm the viability of TIP system replacement with automatic fixed in-core probes (AFIPs, GTs, in a Boiling Water Reactor. The new GNF steady-state reactor core simulator AETNA02 is used to obtain power and exposure distribution. Using this code with an updated methodology for GT power adaption, a reduced value of the GT interpolation uncertainty is obtained that is fed into the LHGR calculation. This new method achieves margin recovery for the adapted thermal limits for use in the Economic Simplified Boiling Water Reactor (ESBWR) or any other BWR in the future that employs a GT based AFIP system for local power measurements. (Author)

  20. Thermal limits validation of gamma thermometer power adaption in CFE Laguna Verde 2 reactor core

    International Nuclear Information System (INIS)

    Cuevas V, G.; Banfield, J.; Avila N, A.

    2016-09-01

    This paper presents the status of GEH work on Gamma Thermometer (GT) validation using the signals of the instruments installed in the Laguna Verde Unit 2 reactor core. The long-standing technical collaboration between Comision Federal de Electricidad (CFE), Global Nuclear Fuel - Americas LLC (GNF) and GE-Hitachi Nuclear Energy Americas LLC (GEH) is moving forward with solid steps to a final implementation of GTs in a nuclear reactor core. Each GT is integrated into a slightly modified Local Power Range Monitor (LPRM) assembly. Six instrumentation strings are equipped with two gamma field detectors for a total of twenty-four bundles whose calculated powers are adapted to the instrumentation readings in addition to their use as calibration instruments for LPRMs. Since November 2007, the six GT instrumentation strings have been operable with almost no degradation by the strong neutron and gamma fluxes in the Laguna Verde Unit 2 reactor core. In this paper, the thermal limits, Critical Power Ratio (CPR) and maximum Linear Heat Generation Rate (LHGR), of bundles directly monitored by either Traverse In-core Probes (TIPs) or GTs are used to establish validation results that confirm the viability of TIP system replacement with automatic fixed in-core probes (AFIPs, GTs, in a Boiling Water Reactor. The new GNF steady-state reactor core simulator AETNA02 is used to obtain power and exposure distribution. Using this code with an updated methodology for GT power adaption, a reduced value of the GT interpolation uncertainty is obtained that is fed into the LHGR calculation. This new method achieves margin recovery for the adapted thermal limits for use in the Economic Simplified Boiling Water Reactor (ESBWR) or any other BWR in the future that employs a GT based AFIP system for local power measurements. (Author)

  1. Verde Valley Community Needs Assessment Project, Spring 1979.

    Science.gov (United States)

    Gose, Frank J.

    A study of the educational needs to be met by the Verde Campus of Yavapai College (YC) involved surveying seven populations. Responses were returned by 88 non-retired community residents, 96 retired members of the community, 191 members of the business sector, 240 current students, 208 former students, 19 faculty members, and 261 high school…

  2. Prefabricated solution to modular construction in Cape Verde

    Science.gov (United States)

    Vieira, Nuno; Amado, Miguel; Pinho, Fernando

    2017-02-01

    Nowadays, the lack of adequate housing in Cape Verde is a growing problem. The migration of the population living in the countryside to the major cities generates an increase of the diameter of the cities. With the lack of economic power, the migrating families tend to occupy the land with houses which don't present proper conditions to living. Praia is the capital of Cape Verde and so on the biggest city of the country. This fact leads Praia to being the city with major economic power and job offer in all country. Consequently, Praia has developed the biggest slum of the Cape Verde and it is urgent to approach this problem in order to create solutions that reveal capacity to start solving it. Cape Verde's unique dry subtropical climate turns indispensable a careful resolution of the housing, in order to ensure the comfort of the occupants. The modular construction is a solution with potential to approach this problem with a fast and economic response. In order to answer the situation, this article introduces a modular solution in order to reach the needing of thermal comfort to the specific case of Praia.

  3. Paso del Aguilo : Jarre de type Rio Verde Poli

    OpenAIRE

    Michelet , Dominique

    1981-01-01

    Zone IV, site n°2. Las Colaciones, Paso del Aguila, municipio Armadillo, San Luis Potosi.Jarre à deux petites anses latérales sous le col, du type Rio Verde Poli. Engobe brun-beige poli. Hauteur totale 13 centimètres. Collection particulière Paso del Aguila.

  4. Reproduction of the flow-power map of the Laguna Verde power plant; Reproduccion del mapa flujo-potencia de la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Amador G, R; Gonzalez M, V M [Comision Nacional de Seguridad Nuclear y Salvaguardias, 03000 Mexico D.F. (Mexico)

    1993-07-01

    The National Commission of Nuclear Safety and Safeguards (CNSNS) requires to have calculation tools which allows it to make analysis independent of the behavior of the reactor core of Laguna Verde nuclear power plant (CNLV) with the purpose to support the evaluation and discharge activities of the fuel recharges licensing. The software package Fms (Fuel Management System) allows to carry out an analysis of the core of the BWR type reactors along the operation cycle to detect possible anomalies and/or helping in the fuel management. In this work it is reproduced the flow-power for the CNLV using the Presto code of the Fms software package. The comparison of results with the map used by the operators of CNLV shows good agreement between them. Another exercise carried out was the changes study that the axial and radial power outlines undergo as well as the thermohydraulic parameters (LHGR, APLHGR, CPR) when moving a control rod. The obtained results show that is had the experience to effect analysis of the reactor behavior using the Presto-Fms code therefore the study of the rest of the software package for the obtention of nuclear parameters used in this code is recommended. (Author)

  5. An evaluation on the design optimization of large capacity tanks in the chemical and volume control system for YGN 3 and 4

    International Nuclear Information System (INIS)

    Park, Byung Ho; Kim, Eun Ki; Ko, Deuk Yoon; Ko, Yong Sang; Kim, Seok Bum

    1996-06-01

    The design of Yonggwang nuclear power plant units 3 and 4 (YGN 3 and 4) is referenced to that of Palo Verde nuclear power plant (Palo Verde NPP) in Arizona, USA. The reactor vessel and steam generator of YGN 3 and 4 are smaller than that of Palo Verde NPP because Palo Verde NPP produces 1,300 Mw electricity, on the other hand, YGN 3 and 4 produces 1,000 Mw electricity. However, other components and systems of YGN 3 and 4 are the same as those of Palo verde NPP. The oversized system components may be considered to ensure the safety and operability by providing sufficient design margin, but it requires unnecessary cost burden to the owner of the plant. This report focuses on the optimization of the volume of the large tanks (i.e., above 400,000 gallons) in CVCS. These tanks are refueling water tank (RWT), reactor makeup water tank (RMWT) and holdup tank (HT). It has been performed that the calculation on the required tank volume based on design requirements, comparison on the calculation results with as-built design, and estimation on the instrumentation setpoint. 19 tabs., 12 figs., 13 refs. (Author)

  6. Investigation of the suspected presence of solid hydrocarbon in bedded salt samples from the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    1985-10-01

    This report contains laboratory test results for two bedded salt samples from the Grabbe No. 1 (PD-2) Well of the Palo Duro Basin, Texas. This study was commissioned to determine whether or not solid hydrocarbons exist in bedded salt samples in the Palo Duro Basin. Laboratory investigations include electron microprobe examinations on polished thin sections and optical examinations and chemical tests on insoluble residues of the salt samples. No direct evidence was found that identifiable solid hydrocarbons are present in either sample of the bedded salt core. The total carbon content of the two salt samples was measured yielding 0.016 and 0.022 weight percent carbon. Detailed microscopic analyses showed that the carbon in the samples was associated with calcite, clays, and the epoxy resin used in sample preparation

  7. Technical assistance in relationship with the reloading analysis of the Laguna Verde Unit 2 reactor. Executive abstract; Asistencia tecnica en relacion con el analisis de recargas de la CNLV U-2

    Energy Technology Data Exchange (ETDEWEB)

    Alonso V, G.; Castro B, M.; Gallegos E, R.; Hernandez L, H.; Montes T, J.L.; Ortiz S, J. J.; Perusquia C, R. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    1993-11-15

    The objective of the report was to carry out a comparative analysis of costs of energy generation among the designs GE9B of General Electric, 9X9-IX of SIEMENS and SVEA-96 of ABB ATOM, proposed to be used as recharge fuel in the Unit 2 of the Laguna Verde Nuclear Power station. (Author)

  8. Exponential-time constitutive law for Palo Duro Unit 4 Salt from the J. Friemel No. 1 Well

    International Nuclear Information System (INIS)

    Senseny, P.E.; Pfeifle, T.W.; Mellegard, K.D.

    1986-07-01

    Values for the nine parameters in the exponential-time constitutive law are presented for Palo Duro Unit 4 salt. The values given for the thermal expansion and two elastic parameters are taken from previous laboratory studies. The six remaining constitutive parameters are evaluated by analyzing data from 12 triaxial compression creep tests. The specimens tested in this study are from the J. Friemel No. 1 well in Deaf County, Texas. 15 refs., 15 figs., 4 tabs

  9. National autonomous university of Mexico RELAP/SCDAPSIM-based plant simulation and training applications to the Laguna Verde NPP

    International Nuclear Information System (INIS)

    Chavez-Mercado, C.; Hohorst, J.K.; Allison, C.M.

    2004-01-01

    The RELAP/SCDAPSIM code, designed to predict the behavior of reactor systems during normal and accident conditions, is being developed by Innovative Systems Software as part of the International SCDAP Development and Training Program (SDTP). This code is being used as the simulator engine for the National Autonomous University of Mexico's Simulation and Training Facility located at the Campus Morelos in Jiutepec, Mexico. This paper describes the RELAP/SCDAPSIM code, the Simulation and Training facility at the National Autonomous University of Mexico, and the application of the training system to the Laguna Verde Nuclear Power Plant located in the Mexican state of Veracruz. (author)

  10. Participation of the ININ in the activities of radioactive waste management of the Laguna Verde Central

    International Nuclear Information System (INIS)

    Medrano L, M.; Rodriguez C, C.; Linares R, D.; Ramirez G, R.; Zarate M, N.

    2006-01-01

    From the beginning of the operation of the Laguna Verde Central (CLV) the National Institute of Nuclear Research (ININ) has come supporting the CLV in the activities of administration of the humid and dry radioactive waste generated by the operation of the two units of the CLV, from the elaboration of procedures to the temporary storage in site, the implementation of a program of minimization and segregation of dry solid wastes, until the classification of the lots of humid waste and bulk dry wastes. In this work the description of the management activities of radioactive wastes carried out by the ININ in the facilities of the CLV to the date is presented, as well as some actions that they are had drifted in the future near, among those that it stands out the determination of the total alpha activity in humid samples by means of scintillation analysis. (Author)

  11. Ageing Management Review of the reactor pressure vessels in Laguna Verde NPP

    International Nuclear Information System (INIS)

    Gris Cruz, Magdalena; Arganis, Carlos R.J.; Medina Almazan, A. Liliana

    2012-01-01

    In the present paper, for both units of Laguna Verde Nuclear Power Plant (LVNPP), the Ageing Management Review of the reactor pressure Vessel was carried out, including the identification of the intended functions, the materials and the environments. The evaluation of the ageing effect/mechanism and the Aging management programs currently implemented were prepared. The most important aging effects/ mechanisms are: loss of fracture toughness due to neutron irradiation embrittlement, fatigue, stress corrosion cracking (SCC), general corrosion and erosion-corrosion. The neutron irradiation embrittlement is managed by the reactor vessel materials surveillance program. The fatigue is a Time Limited Aging Analysis (TLAA), for which is necessary to calculate some fatigue usage factors. SCC is managed by, the In service inspections (ISI) program, but also by the Water Chemistry program, including, currently, On Line Noble Chem. The water chemistry program also manages General Corrosion and erosion-corrosion. The results were compared with the GALL report. (author)

  12. Dissolution of the Upper Seven Rivers and Salado salt in the interior Palo Duro Basin, Texas: Revision: Topical report

    International Nuclear Information System (INIS)

    DeConto, R.T.; Murphy, P.J.

    1987-09-01

    The Upper Seven Rivers and Salado Formations contain the uppermost salts within the interior Palo Duro Basin, Stratigraphic and structural evidence based on geophysical well logs indicate that both dissolution and facies change have influenced the thickness of these uppermost salts. The magnitude of vertical salt loss due to dissolution is interminable at this time because original salt thickness is unknown. Gradual thinning of the Upper Seven Rivers Formation is recognized from south to north across the Palo Duro Basin. Anhydrites within the formation pinch out toward the basin margins, indicating that section loss is in part depositionally controlled. Additionally, informal subdivision of the Upper Seven Rivers Formation suggests that salt dissolution has occurred in the uppermost salt. A northeast-trending zone of thin Upper Seven Rivers Formation in portions of Deaf Smith, Randall, Castro, and Parmer Counties is possibly related to Tertiary dissolution. In New Mexico, local thinning of the Upper Seven Rivers Formation may be associated with faulting. Triassic erosion on uplifted fault blocks has affected the Upper Permian section. The Salado salt margin is located within the interior Palo Duro Basin. Geophysical well logs and core evidence indicate that the salt margin has migrated basinward as a result of dissolution. Permian dissolution probably contributed to some salt loss. 106 refs., 31 figs., 2 tabs

  13. Technical basis for high-level waste repository land control requirements for Palo Duro Basin, Paradox Basin, and Richton Dome

    International Nuclear Information System (INIS)

    Chen, C.P.; Raines, G.E.

    1987-02-01

    Three sites, the Palo Duro Basin in Texas, the Paradox Basin in Utah, and the Richton Dome in Mississippi, are being investigated by the US Department of Energy for high-level radioactive-waste disposal in mined, deep geologic repositories in salt. This report delineates the use of regulatory, engineering, and performance assessment information to establish the technical basis for controlled area requirements. Based on the size of the controlled area determined, plus that of the geologic repository operations area, recommendations of possible land control or ownership area requirements for each locale are provided. On a technical basis, the following minimum land control or ownership requirements are recommended, assuming repository operations area of 2240 ac (907 ha), or 3.5 mi 2 (9.1 km 2 ): Palo Duro Basin - 4060 ac (1643 ha), or 6.3 mi 2 (16.4 km 2 ); Paradox Basin - 4060 ac (1643 ha), or 6.3 mi 2 (16.4 km 2 ); and Richton Dome - 5000 ac (2024 ha), or 7.8 mi 2 (20.2 km 2 ). Of the factors used to determine the technically based recommendations, one was found to dominate each locale. For the Palo Duro and Paradox Basins, the dominant factor was the need to limit potential radionuclide release by ground-water flow to the accessible environment. For the Richton Dome, the dominant factor was the need to limit the potential effects of solution mining on dome and repository integrity

  14. Seafloor mapping of the southeast Iberian margin (from Cabo de Palos to Cabo de Gata)

    Science.gov (United States)

    Lastras, Galderic; Leon, César; Elvira, Elena; Pascual, Laura; Muñoz, Araceli; de Cárdenas, Enrique; Acosta, Juan; Canals, Miquel

    2014-05-01

    We present the multibeam bathymetry and derived maps of the southeast Iberian margin from Cabo de Palos to Cabo de Gata, 37º35'N to 35º45'N and 2º10'W to 0º20'E, from the coastline down to the Algero-Balearic abyssal plain at depths exceeding 2600 m. The edition of of the maps is carried out within the Complementary Action VALORPLAT ("Scientific valorisation of multibeam bathymetry data from the Spanish continental shelf and slope"), funded by the Spanish Ministry of Economy and Competitivity. The multibeam bathymetry data of the slope and abyssal plain were obtained during different surveys in 2004, 2006 and 2007 on board R/V Vizconde de Eza with a Simrad EM300 multibeam echo-sounder as part of the CAPESME Project, a collaboration between the Spanish Institute of Oceanography (IEO) and General Secretariat of Fisheries (SGP), primarily aiming at creating maps of the fishing grounds of the Mediterranean continental margins of Spain. Multibeam bathymetry data from the continental shelf were obtained within the ESPACE project, also in a cooperative frame between IEO and SGP. The map series is constituted by a general map at 1:400,000 scale and 14 detailed maps at 1:75,000 scale, which include inset maps on slope gradients and seafloor nature (rock or sediment type), the later obtained with rock dredges and Shipeck sediment dredges. Both the detailed maps and the general map are available in paper print, and the whole collection is also distributed in an edited USB. The geological features displayed in the different maps include the continental shelf, with abundant geomorphic features indicative of past sea-level changes, the continental slope carved by the Palos, Tiñoso, Cartagena Este, Cartagena Oeste, Águilas, Almanzora, Alias, Garrucha and Gata submarine canyons, the Mazarrón, Palomares and Al-Mansour escarpments, the Abubácer, Maimonides and Yusuf ridges, the Águilas and Al-Mansour seamounts, and the Algero-Balearic abyssal plain where prominent

  15. Cape Verde: Marketing Good Governance Kap Verde: Die Vermarktung von Good Governance

    Directory of Open Access Journals (Sweden)

    Bruce Baker

    2009-01-01

    Full Text Available Faced with a lack of natural resources Cape Verde has made good governance one of its most marketable products. Running parallel to the institutionalisation of democratic politics there has been an overhaul and growing sophistication in public administration, though certain weaknesses persist. This report argues that it is reform and improvement in this area in particular that has enabled this small island state to punch above its weight and achieve remarkable social, economic and political results. But will the successful formula of the past decade prove sufficient for the future? Poverty and unemployment have by no means been conquered. Much of the economic growth has been based in the tourist sector and the government is well aware of the dangers of over-reliance on a single industry. Cape Verde’s midway location between South America and Europe and its increasing international transport connections will continue to offer advantages to drug traffickers. The next few years of the world financial crisis will show whether marketing good governance is enough and whether this is the model for small resource developing states. Der Inselstaat Kap Verde hat seine Anstrengungen zu guter Regierungsführung (Good Governance erfolgreich demonstriert. Parallel zur Institutionalisierung demokratischer Regierungsstrukturen wurde die Verwaltung reformiert und modernisiert, wenn auch immer noch Problembereiche erkennbar sind. Der Autor sieht insbesondere in den politischen und administrativen Reformen den Hintergrund für die erfolgreiche soziale, wirtschaftliche und politische Entwicklung dieser kleinen Inselrepublik. Aber wird dieses Rezept, das im vergangenen Jahrzehnt seine Wirksamkeit beweisen konnte, auch in Zukunft ausreichend sein? Armut und Unterbeschäftigung sind keineswegs besiegt. Ein Großteil des Wirtschaftswachstums basiert auf dem Tourismussektor; die Regierung ist sich der Gefahr wohl bewusst, die in zu großer Abhängigkeit von einem

  16. Background radiation in two locations in Deaf Smith and Swisher Counties within the Palo Duro Basin

    International Nuclear Information System (INIS)

    1984-10-01

    Data on external background radiation doses resulting from cosmic, terrestrial, and fallout sources and on concentrations of radioactivity in environmental media are presented and discussed. Doses to individuals located at the approximate centers of two locations in Texas, one in Deaf Smith County and the other in Swisher County, are given, as are the population doses to people residing within 50 miles of each of the approximate centers. No adjustments have been made for the effects of buildings on radiation doses - that is, the shielding from external radiation afforded by the buildings and radiation from building materials are not accounted for. Concentrations of radioactivity in air, water, and milk in the region are also given. Because of the lack of specific information on background radiation at the locations, the external-dose rates to people and the radioactivity levels in environmental media for the region have been taken from the literature. A background radiation survey will be conducted in the Palo Duro Basin to obtain additional data. 26 references, 3 figures, 15 tables

  17. Site surveillance and maintenance program for Palos Park: Report for 1987

    International Nuclear Information System (INIS)

    Golchert, N.W.

    1988-04-01

    The results of the environmental monitoring program conducted at Site A/Plot M in the Palos Park Forest Preserve area for CY 1987 are presented. The monitoring program is the ongoing remedial action that resulted from the original radiological characterization of the site. This study had determined that hydrogen-3 (as tritiated water) migrated from the burial ground and was present in two nearby hand-pumped picnic wells. The current program consists of sample collection and analysis of air, surface and subsurface water, and bottom sediment. The results of the analyses are used to (1) determine the migration pathway of water from the burial ground (Plot M) to hand-pumped picnic wells, (2) establish if buried radionuclides other than hydrogen-3 have migrated, and (3) generally characterize the radiological environment of the area. The program was designed to study the migration of non-radiological hazardous waste constituents that may have been buried with the radioactive waste. This was done by analyzing borehole water samples for selected heavy metals and organic compounds and analyzing quarterly water samples from the Red Gate Woods picnic well for inorganic constituents. Hydrogen-3 in the Red Gate Woods picnic well continued to show the same pattern of elevated levels in the winter and low concentrations in the summer, but the magnitude of the current winter peak was significantly less than in earlier years. 16 refs., 6 figs., 15 tabs

  18. Turbine model for the Laguna Verde nucleo electric central based in the RELAP code; Modelo de turbina para la Central nucleoelectrica de Laguna Verde basado en el codigo RELAP

    Energy Technology Data Exchange (ETDEWEB)

    Cortes M, F.S.; Ramos P, J.C.; Salazar S, E.; Chavez M, C. [Facultad de Ingenieria, Division de Estudios de Posgrado, Grupo de Ingenieria Nuclear, UNAM (Mexico)]. e-mail: cchavez2@cableonline.com.mx

    2003-07-01

    The Nuclear Power stations as Laguna Verde occupy at the present time a place every time but important as non pollutant alternative, economic and trusty to generate electricity. It is for it that the Group of Nuclear Engineering of the Engineering Faculty (GrlNFI) of the National Autonomous University of Mexico (UNAM) it develops investigation projects applied to Nuclear Centrals. One of the projects in process is the development of a Classroom simulator, which it can configures to consent to diverse models of nuclear systems with training purposes in normal operation, or, to consent to specialized nuclear codes for the analysis of transitory events and have a severe accident. This work describes the development, implementation and it proves of a simplified model of the Main turbine to be integrated to the group of models of the Classroom simulator. It is part of the current effort of GrlNFI guided to obtain a representation of all the dynamic models necessary to simulate the Plant Balance of the Laguna Verde Central. It is included the development of the unfolding graphic which represent the modeling of the Main turbine, and of the control interface that allows the user to manipulate in simple way, direct and interactive this device during the training or the analysis. With this work it is wanted to contribute to the training of new technicians and to support the operation personnel of the Centrals. Also, the developed infrastructure is guided to contribute in the design and analysis of new Nuclear Power stations with the contribution of new computational tools for the visualization, simulation and process control. (Author)

  19. Out of operation in simultaneous way of the two reactors of nucleoelectric central of Laguna Verde(Mexico)

    International Nuclear Information System (INIS)

    Mar, Bernardo Salas

    2013-01-01

    The two nuclear reactors that Mexico has in the Laguna Verde Nuclear Power Plant, were out of operation simultaneously in September 2012. First it was reported that one of the reactors had problems with the diesel generator, while the other had problems with the nuclear fuel reloading. The day after it was reported a problem related to sediment in the Obra de Toma, place the plant feeds seawater to cool the condenser the depth to which it must operate is 6 meters, with the current level of 1.5 meters, causing a lack of cooling water. Finally it was reported the cause of the suspension of operations, the cracks in jet pumps in both reactors. It is described a brief analysis of these opinions. The reactors are of cooling water of General Electric (BWR-5) and generate 1640 MWe each one

  20. Talento verde: caracterización y búsqueda

    Directory of Open Access Journals (Sweden)

    María del Carmen Torres-Salazar

    2015-01-01

    Full Text Available Introducción: Los impactos del calentamiento global y el cambio climático son una preocupación en prácticamente todos los sectores de la sociedad, debido a las consecuencias que ya se perciben y que afectarán cada día más tanto a los sistemas naturales como a los creados por el hombre, generalmente de forma negativa. Para revertir estos efectos negativos y no continuar deteriorando el medio ambiente, es necesario un tipo especial de personas que sean capaces de tomar las decisiones adecuadas en los ámbitos en los que se desenvuelven. En esta investigación, estos seres humanos se denominan: “personas con talento verde”. El término talento verde no ha sido caracterizado y su uso es aun restringido. Esta investigación hace una caracterización del talento verde y propone una encuesta para detectar a las personas que cuentan con estas características. En este artículo, se reporta solo la validación de la encuesta. Es importante hacer notar que este trabajo forma parte de una investigación más amplia que busca conocer la relación entre directivos con talento verde y prácticas de cadena de suministro sustentable. Método: La caracterización del talento verde se realizó a través de la metodología de representaciones sociales, de la cual surgieron una serie de preguntas que buscan las características de talento verde en directivos de empresas y que forman parte de una encuesta de mayor cobertura que fue piloteada para su validación. La confiabilidad se midió a través del Alfa de Crombach y la validez por un Análisis Factorial. Resultados: Se encontraron nueve aspectos que caracterizan a las personas con talento verde, con las cuales se construyeron también nueve preguntas. Estas preguntas se hicieron a 25 directivos de empresas que participan en la Cámara de la Industria de la Transformación (CANACINTRA con el objetivo de validar el instrumento. El alfa de Crombrach obtenido fue del 0.948 y el análisis factorial indica

  1. Validation of the thermal balance of Laguna Verde turbine under conditions of extended power increase; Validacion del balance termico de turbina de Laguna Verde en condiciones de aumento de potencia extendido

    Energy Technology Data Exchange (ETDEWEB)

    Castaneda G, M. A.; Cruz B, H. J.; Mercado V, J. J.; Cardenas J, J. B.; Garcia de la C, F. M., E-mail: miguel.castaneda01@cfe.gob.mx [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Carretera Cardel-Nautla Km 42.5, Alto Lucero, Veracruz (Mexico)

    2012-10-15

    The present work is a continuation of the task: Modeling of the vapor cycle of Laguna Verde with the PEPSE code to conditions of thermal power licensed at present (2027 MWt) in which the modeling of the vapor cycle of the nuclear power plant of Laguna Verde was realized with PEPSE code (Performance Evaluation of Power System Efficiencies). Once reached the conditions of nominal operation of extended power increase, operating both units to 2371 MWt; after the tests phase of starting-up and operation is necessary to carry out a verification of the proposed design of the vapor cycle for the new operation conditions. All this, having in consideration that the vapor cycle designer only knows the detail of the prospective performance of the main turbine, for all the other components (for example pumps, heat inter changers, valves, reactor, humidity separators and re-heaters, condensers, etc.) makes generic suppositions based on engineering judgment. This way carries out the calculations of thermal balance to determine the guaranteed gross power. The purpose of the present work is to comment the detail of the validation carried out of the specific thermal balance (thermal kit) of the nuclear power plant, making use of the design characteristics of the different components that conform the vapor cycle. (Author)

  2. 15 years of production of electric energy of the Laguna Verde power plant, its plans and future; 15 anos de produccion de energia electrica de la Central Laguna Verde, sus planes y futuro

    Energy Technology Data Exchange (ETDEWEB)

    Rivera C, A [CFE, Central Laguna Verde, Km. 42.5 Carretera Cardel-Nautla, Veracruz (Mexico)

    2005-07-01

    In the year 2005 Laguna Verde power plant reaches 15 years of producing electric power in Mexico arriving to but of 100 million Megawatts-hour from their beginning of commercial activities. The Unit 1 that entered at July 29, 1990 and the Unit 2 at April 10, 1995, obtaining the Disposability Factors from their origin is: 84.63% in Unit 1 and 83.67% in Unit 2. The march of the X XI century gives big challenges of competition to the Laguna Verde Central, with the possible opening of the electric market to private investment, for their Goals and Objectives of a world class company, taking the evaluation system and qualification of the World Association of Nuclear Operators (WANO) that promotes the Excellence in the operation of the nuclear power stations in all their partners. This Association supports the development of programs that allow the monitoring of the behavior in Safety Culture, Human fulfilment, Equipment reliability, Industrial Safety, Planning, Programming and Control, Personalized Systematic Training, and the use of the Operational experience in the daily tasks. The present work tries to explain the system of evaluation/qualification of WANO, the definition of Goals and Objectives to reach the excellence and of the programs, it will present the Program of the Reliability of Equipment with its main actions the productivity. (Author)

  3. Cabo Verde telemedicine program: initial results of nationwide implementation.

    Science.gov (United States)

    Latifi, Rifat; Dasho, Erion; Merrell, Ronald C; Lopes, Miguel; Azevedo, Vanda; Bekteshi, Flamur; Osmani, Kalterina L; Qesteri, Orland; Kucani, Julian; Lecaj, Ismet

    2014-11-01

    Telemedicine and e-health have been suggested as one solution for closing the health disparity gap between the developed world and the developing world. Yet evidence is lacking from current successful programs in the developing world and, in particular, from sub-Saharan Africa. The primary objective of our study was to present the preliminary results of our efforts in building the Integrated Telemedicine and e-Health Program for Cabo Verde (ITeHP-CV), with an emphasis on initial utilization and results. This is a prospective study of data collected while we worked to establish a fully functional, integrated national telemedicine network and virtual education network in Cabo Verde. We used the International Virtual e-Hospital Foundation strategic approach known as "initiate-build-operate-transfer" over a 26-month period (November 2011-December 2013). We describe herein the five main pillars of this process that have been implemented: (1) capacity building; (2) network development and deployment of equipment; (3) implementation of clinical telemedicine; (4) implementation of activities related to continuing medical education, delivered from within the country and from abroad; and (5) establishment and use of the electronic virtual library. Based on comprehensive technical and medical assessment of the country's needs, 10 fully functional telemedicine centers in all nine inhabited islands of the Republic of Cabo Verde have been established. RESULTS are presented under the five main pillars of capacity building, network deployment, implementation of clinical telemedicine, implementation of continuing medical education activities, and establishment of the electronic virtual library. The ITeHP-CV has been successfully launched, and the initial results are encouraging. The continuity of the program and sustainability are primary goals once the program is transferred fully to the Ministry of Health of Cabo Verde. A long-term follow-up study is required in order to ensure

  4. Community-based tourism in Cape Verde - a case study

    OpenAIRE

    Tomas Lopez-Guzman; Osvaldo Borges; Ana Maria Castillo-Canalejo

    2011-01-01

    Community-based tourism is taking its place in the world as an alternative to traditional tourist destinations, especially in developing countries. This form of tourism allows for greater contact with the local community and for the tourist to experience new sensations while enabling the economic and social development of the geographic area. In this paper, the results of fieldwork carried out in the island of Fogo (Cape Verde) are presented, assessing the opinion and perception tourists visi...

  5. Mexico's nuclear paradox

    International Nuclear Information System (INIS)

    Redclift, M.

    1989-01-01

    Opposition to Mexico's nuclear reactors at Laguna Verde has grown during the last two years. The nuclear programme is blamed for being expensive and wasteful, and the decision to rely on the USA contradicts Mexico's espoused policy of greater independence from the USA. The way in which petroleum revenues were used to precipitate the nuclear option is compared with the lack of urgency given to renewable energy and greater energy efficiency. From a social and environmental perspective, as well as an economic one, Mexico's nuclear programme is judged expensive and irrelevant. (author)

  6. Verde Macael: A Serpentinite Wrongly Referred to as a Marble

    Directory of Open Access Journals (Sweden)

    Santiago del Barrio

    2013-02-01

    Full Text Available Serpentinites are used in both exterior and interior locations, but not all serpentinites are equal: they vary in physical-mechanical behavior and are not all suitable for similar uses. The serpentinites most commonly used worldwide come from India, Pakistan or Egypt. Spain has traditionally quarried two ultramafic massifs, one in Galicia (Verde Pirineos and one in Andalucía (Verde Macael. Some of these quarries were small family-run businesses. In both cases, these rocks are commercially available as “green marble.” These serpentinites commonly have a high degree of carbonation, but the process does not always take place with the same intensity. Carbonate can act as a cementing agent of the other phases, increasing the mechanical strength parameters. As a result, an improvement in the strength conditions is achieved, but a misinterpretation of the suitability of the rock may occur because a perception among users that “green marble” is similar to geologically defined marble. This may lead to inappropriate applications as an ornamental stone. At a time of economic crisis in Europe, the natural stone sector is encouraged to invest in research to identify the best quality products that can compete profitably with those currently being imported from other countries. This paper provides a comparison of properties of the Verde Macael serpentinite with a true marble in the hope of contributing to improving the natural stone industrial sector.

  7. Renewable energy projects to electrify rural communities in Cape Verde

    International Nuclear Information System (INIS)

    Ranaboldo, Matteo; Lega, Bruno Domenech; Ferrenbach, David Vilar; Ferrer-Martí, Laia; Moreno, Rafael Pastor; García-Villoria, Alberto

    2014-01-01

    Highlights: • The design of 2 off-grid electrification projects in Cape Verde is developed. • Configurations with hybrid renewable energy systems and micro-grids are considered. • A detailed micro-scale wind resource assessment is carried out. • An optimization model is used in order to support the design. • The proposed system is economically beneficial in comparison with diesel generation. - Abstract: Even though Cape Verde has high wind and solar energy resources, the conventional strategy for increasing access to electricity in isolated rural areas is by centralized microgrids with diesel generators. In this study, the design of 2 off-grid electrification projects based on hybrid wind–photovoltaic systems in Cape Verde is developed and analyzed. The design considers some significant novelty features in comparison with previous studies. First a detailed wind resource assessment is carried out combining meso-scale wind climate data and a specialized micro-scale wind flow model. Then a mathematical model is used for the design of off-grid projects considering a combination of individual systems and microgrids. In this study, locations far from the demand points are also considered as possible generation points. Various design configurations are analyzed and compared. The proposed configurations exploit the highest wind potential areas and are economically beneficial in comparison with diesel generator systems

  8. 15 years of production of electric energy of the Laguna Verde power plant, its plans and future

    International Nuclear Information System (INIS)

    Rivera C, A.

    2005-01-01

    In the year 2005 Laguna Verde power plant reaches 15 years of producing electric power in Mexico arriving to but of 100 million Megawatts-hour from their beginning of commercial activities. The Unit 1 that entered at July 29, 1990 and the Unit 2 at April 10, 1995, obtaining the Disposability Factors from their origin is: 84.63% in Unit 1 and 83.67% in Unit 2. The march of the X XI century gives big challenges of competition to the Laguna Verde Central, with the possible opening of the electric market to private investment, for their Goals and Objectives of a world class company, taking the evaluation system and qualification of the World Association of Nuclear Operators (WANO) that promotes the Excellence in the operation of the nuclear power stations in all their partners. This Association supports the development of programs that allow the monitoring of the behavior in Safety Culture, Human fulfilment, Equipment reliability, Industrial Safety, Planning, Programming and Control, Personalized Systematic Training, and the use of the Operational experience in the daily tasks. The present work tries to explain the system of evaluation/qualification of WANO, the definition of Goals and Objectives to reach the excellence and of the programs, it will present the Program of the Reliability of Equipment with its main actions the productivity. (Author)

  9. Population size, breeding biology and on-land threats of Cape Verde petrel (Pterodroma feae) in Fogo Island, Cape Verde.

    Science.gov (United States)

    Militão, Teresa; Dinis, Herculano Andrade; Zango, Laura; Calabuig, Pascual; Stefan, Laura M; González-Solís, Jacob

    2017-01-01

    Cape Verde petrel (Pterodroma feae) is currently considered near threatened, but little is known about its population size, breeding biology and on land threats, jeopardizing its management and conservation. To improve this situation, we captured, marked and recaptured (CMR) birds using mist-nets over 10 years; measured and sexed them; monitored up to 14 burrows, deployed GPS devices on breeders and analyzed activity data of geolocators retrieved from breeders in Fogo (Cape Verde). We set cat traps over the colony and investigated their domestic/feral origin by marking domestic cats from a nearby village with transponders, by deploying GPS devices on domestic cats and by performing stable isotope analyses of fur of the trapped and domestic cats. The population of Fogo was estimated to be 293 birds, including immatures (95% CI: 233-254, CMR modelling). Based on geolocator activity data and nest monitoring we determined the breeding phenology of this species and we found biometric differences between sexes. While monitoring breeding performance, we verified a still ongoing cat predation and human harvesting. Overall, data gathered from trapped cats without transponder, cats GPS trips and the distinct isotopic values between domestic and trapped cats suggest cats visiting the colony are of feral origin. GPS tracks from breeders showed birds left and returned to the colony using the sector NE of the islands, where high level of public lights should be avoided specially during the fledging period. Main threats for the Cape Verde petrel in the remaining breeding islands are currently unknown but likely to be similar to Fogo, calling for an urgent assessment of population trends and the control of main threats in all Cape Verde Islands and uplisting its conservation status.

  10. Population size, breeding biology and on-land threats of Cape Verde petrel (Pterodroma feae in Fogo Island, Cape Verde.

    Directory of Open Access Journals (Sweden)

    Teresa Militão

    Full Text Available Cape Verde petrel (Pterodroma feae is currently considered near threatened, but little is known about its population size, breeding biology and on land threats, jeopardizing its management and conservation. To improve this situation, we captured, marked and recaptured (CMR birds using mist-nets over 10 years; measured and sexed them; monitored up to 14 burrows, deployed GPS devices on breeders and analyzed activity data of geolocators retrieved from breeders in Fogo (Cape Verde. We set cat traps over the colony and investigated their domestic/feral origin by marking domestic cats from a nearby village with transponders, by deploying GPS devices on domestic cats and by performing stable isotope analyses of fur of the trapped and domestic cats. The population of Fogo was estimated to be 293 birds, including immatures (95% CI: 233-254, CMR modelling. Based on geolocator activity data and nest monitoring we determined the breeding phenology of this species and we found biometric differences between sexes. While monitoring breeding performance, we verified a still ongoing cat predation and human harvesting. Overall, data gathered from trapped cats without transponder, cats GPS trips and the distinct isotopic values between domestic and trapped cats suggest cats visiting the colony are of feral origin. GPS tracks from breeders showed birds left and returned to the colony using the sector NE of the islands, where high level of public lights should be avoided specially during the fledging period. Main threats for the Cape Verde petrel in the remaining breeding islands are currently unknown but likely to be similar to Fogo, calling for an urgent assessment of population trends and the control of main threats in all Cape Verde Islands and uplisting its conservation status.

  11. Reproduction of the flow-power map of the Laguna Verde power plant

    International Nuclear Information System (INIS)

    Amador G, R.; Gonzalez M, V.M.

    1993-01-01

    The National Commission of Nuclear Safety and Safeguards (CNSNS) requires to have calculation tools which allows it to make analysis independent of the behavior of the reactor core of Laguna Verde nuclear power plant (CNLV) with the purpose to support the evaluation and discharge activities of the fuel recharges licensing. The software package Fms (Fuel Management System) allows to carry out an analysis of the core of the BWR type reactors along the operation cycle to detect possible anomalies and/or helping in the fuel management. In this work it is reproduced the flow-power for the CNLV using the Presto code of the Fms software package. The comparison of results with the map used by the operators of CNLV shows good agreement between them. Another exercise carried out was the changes study that the axial and radial power outlines undergo as well as the thermohydraulic parameters (LHGR, APLHGR, CPR) when moving a control rod. The obtained results show that is had the experience to effect analysis of the reactor behavior using the Presto-Fms code therefore the study of the rest of the software package for the obtention of nuclear parameters used in this code is recommended. (Author)

  12. Fibers and cylinders of cryptomelane-hollandite in Permian bedded salt, Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Belkin, H.E.; Libelo, E.L.

    1987-01-01

    Fibers and thin-walled, hollow cylinders of cryptomelane-hollandite have been found in both the chevron and the clear salt from various drill cores in Permian bedded salt from the Palo Duro Basin, Texas. The authors have found fibers or cylinders from only the lower San Andres Formation units 4 and 5, the upper San Andres Formation, and the Salado-Transill salt. The fibers are inorganic, light to dark reddish brown, pleochroic, highly birefringent, filamentary single crystals, < 1 to ∼ 5 μm in diameter, with length-to-diameter ratios of at least 20:1. The fibers can be straight and/or curved, can bifurcate, can form loops, waves or spirals, and can be isolated or in parallel groups. Detailed petrographic analyses show no evidence for recrystallization or deformation of the enclosing salt after fiber formation. Although the authors observations do not provide a definitive explanation for fiber origin, they suggest that the fibers grew in situ by a solid-state diffusional process at low temperatures. The cylinders are pleochroic, highly birefringent, light to dark reddish brown, hollow, thin-walled, open-ended right cylinders, having a 1- to 2-μm wall thickness and variable lengths and diameters. There also appear to be single crystals of cryptomelane-hollandite, but these are found almost entirely in fluid inclusions in the chevron and clear salt. Their presence in the primary halite suggests that they were formed contemporaneously with the chevron structure and were accidentally trapped in the fluid inclusions. The observation of cylinders partially or completely enclosed by salt stratigraphically above large fluid inclusions suggests that natural downward fluid-inclusion migration has occurred, in response to the geothermal gradient

  13. Juegos de Palo en Lara. Elementos para la historia social de un arte marcial venezolano

    Directory of Open Access Journals (Sweden)

    Röhrig Assunção, Matthias

    1999-04-01

    Full Text Available This article situates Venezuelan stick fighting among the wider field of European and Afro-American martial arts. The author analyses the different forms used since the early 19th century by men in the rural areas of the state of Lara, where it is still practised today. Whereas the Juego de Garrote serves recreational and sportive purposes, the Juego de Batalla is part of a broader devotion to Saint Anthony. The criminal records show how the use of the fighting stick in the period 1880-1930 allowed the construction of a male identity (the «guapo» through the frequent fights between men.

    Este trabajo intenta situar a los juegos de palo venezolanos dentro de una perspectiva más amplia de las artes marciales europeas y afro-americanas. Analiza las diferentes modalidades practicadas desde el siglo XIX por los hombres del campo en Lara, Estado donde se conservó su práctica hasta hoy en día. Mientras el Juego de Garrote servía y sirve para fines recreativos y deportivos, el Juego de Batalla era y es parte de la devoción a San Antonio. Los procesos criminales muestran cómo el uso del garrote permitió la construcción de una identidad masculina («el guapo» a través de las frecuentes riñas entre hombres en el período 1880-1930.

  14. Estudio de viabilidad de una instalación fotovoltaica para una vivienda unifamiliar situada en Cabo de Palos

    OpenAIRE

    Sánchez Ros, Adrián Antonio

    2015-01-01

    El presente proyecto tiene por objetivo el análisis técnico y económico de una instalación fotovoltaica en una vivienda unifamiliar ubicada en Cabo de Palos (Cartagena), planteando distintas alternativas de conexión o no a la red: - Instalación fotovoltaica conectada a red, dedicadas a la inyección a la red y venta de la energía eléctrica. - Instalación fotovoltaica aislada, dedicadas al autoconsumo de la electricidad generada. - Instalación fotovoltaica de autoconsumo in...

  15. Palinofloras de las formaciones El Morterito y Palo Pintado [Mioceno Superior-Plioceno Inferior], noroeste de Argentina

    OpenAIRE

    Horn, Maricel Yanina

    2014-01-01

    En esta Tesis Doctoral se presenta el estudio palinológico de dos unidades litológicas del Mioceno Tardío/Plioceno de Argentina: la Formación El Morterito (Aloformación Playa del Zorro) aflorante en el valle del Cajón, provincia de Catamarca y Formación Palo Pintado en el Valle Calchaquí, provincia de Salta. La sucesión Neógena del valle del Cajón fue primeramente descripta como Formación El Morterito, posteriormente se reconocieron tres Aloformaciones. Considerando las áreas de distribución ...

  16. Financially troubled El Paso discontinues more nonutility operations

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    As part of a plan to phase out its nonutility businesses, El Paso Electric Company will discontinue its remaining PascoTex Corporation operations, consisting of the manufacture of specialty steel products, and company management released revised estimates of losses to be incurred during the disposal period. Recently El Paso announced it would also bow out of most of its nonutility real estate operations. Increased operating expenses, principally at El Paso's Palo Verde station nuclear facility, have also impacted the bottom line. All three units at Palo Verde were out of service at the time of this writing. The good news was that energy sales have increased

  17. 77 FR 14058 - Santa Teresa Southern Railroad, LLC-Operation Exemption-Rail Line of Verde Logistics Railroad...

    Science.gov (United States)

    2012-03-08

    ... Southern Railroad, LLC--Operation Exemption--Rail Line of Verde Logistics Railroad, LLC at Santa Teresa... notice of exemption under 49 CFR 1150.31 to operate approximately 12,000 feet of rail line owned by Verde Logistics Railroad, LLC (Verde). The rail line extends between a point of connection with Union Pacific...

  18. The Cape Verde Islands are home to a small and genetically distinct humpback whale breeding population

    NARCIS (Netherlands)

    Bérubé, Martine; Ryan, Conor; Berrow, Simon D.; Suarez, Pedro Lopez; Monteiro, Vanda; Wenzel, Frederick; Robbins, Jooke; Mattila, David; Vikingsson, G.A.; Øien, Nils; Palsboll, Per

    2013-01-01

    The Cape Verde Islands appear to be winter breeding ground of the smallest humpback whale population yet known. However, it is unclear whether the humpback whales at the Cape Verde Islands interbreed with those in the West Indies. Here we present the results of the genetic analysis of 50 humpback

  19. Cape Verde. A Country Guide Series Report from the AACRAO-AID Project.

    Science.gov (United States)

    Sevigny, Joseph A.

    This report provides information on the education system of Cape Verde, and is designed to assist college admissions officers and registrars in the United States with the admission and placement of students from that country. The report contains general information on the geography, history, and people of Cape Verde, as well as more specific…

  20. Mesa Verde--A Year-Round High School. A Descriptive Report of 1980-81.

    Science.gov (United States)

    Housden, Terry; Holmes, Lynda

    Mesa Verde High School was constructed in 1974 and is the last high school built in the San Juan (California) Unified District. It serves students in grades 9 through 12 and has an open enrollment policy. Mesa Verde operates on a year-round schedule with students divided into three tracks. Basically, each track is in session for 9 weeks and then…

  1. Estimation of fast neutron fluence in steel specimens type Laguna Verde in TRIGA Mark III reactor; Estimacion de la fluencia de neutrones rapidos en probetas de acero tipo Laguna Verde en el reactor Triga Mark III

    Energy Technology Data Exchange (ETDEWEB)

    Galicia A, J.; Francois L, J. L. [UNAM, Facultad de Ingenieria, Departamento de Sistemas Energeticos, Ciudad Universitaria, 04510 Ciudad de Mexico (Mexico); Aguilar H, F., E-mail: blink19871@hotmail.com [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2015-09-15

    The main purpose of this work is to obtain the fluence of fast neutrons recorded within four specimens of carbon steel, similar to the material having the vessels of the BWR reactors of the nuclear power plant of Laguna Verde when subjected to neutron flux in a experimental facility of the TRIGA Mark III reactor, calculating an irradiation time to age the material so accelerated. For the calculation of the neutron flux in the specimens was used the Monte Carlo code MCNP5. In an initial stage, three sheets of natural molybdenum and molybdenum trioxide (MoO{sub 3}) were incorporated into a model developed of the TRIGA reactor operating at 1 M Wth, to calculate the resulting activity by setting a certain time of irradiation. The results obtained were compared with experimentally measured activities in these same materials to validate the calculated neutron flux in the model used. Subsequently, the fast neutron flux received by the steel specimens to incorporate them in the experimental facility E-16 of the reactor core model operating at nominal maximum power in steady-state was calculated, already from these calculations the irradiation time required was obtained for values of the neutron flux in the range of 10{sup 18} n/cm{sup 2}, which is estimated for the case of Laguna Verde after 32 years of effective operation at maximum power. (Author)

  2. Preliminary simulation model to determine ground-water flow and ages within the Palo Duro Basin hydrogeologic province

    International Nuclear Information System (INIS)

    Atwood, H.; Picking, L.

    1986-01-01

    Ground-water flow through the Palo Duro and Tucumcari Basins is simulated by developing a hydrogeolgic profile and applying a cross-sectional, finite-element, numerical model to the profile. The profile is 350 miles long and 2 miles deep and extends from east-central New Mexico to the Texas-Oklahoma border. It is comprised of hydrogeologic units that are identified from geophysical well logs, sample logs, and core descriptions. A hydrogeologic unit as used in this profile is a physically continuous rock sequence with hydrologic properties that are relatively consistent throughout and distinct from surrounding units. The resulting hydrogeologic profile, with the exception of the Ogallala Formation and the Dockum Group, is discretized into a 6000-element mesh and a 22,000-element mesh. Permeability values assigned to hydrogeologic units were, in part, calculated from drill stem tests conducted throughout the Palo Duro Basin. Ground-water age and travel paths are determined by applying Darcy's equation to selected flow lines. The 170 million-year age determined from ground-water at points within the Wolfcamp Series compares favorably with the geochemical data for this region. An age of 188 million years is determined for the Pennsylvanian granite wash

  3. Area environmental characterization report of the Dalhart and Palo Duro basins in the Texas Panhandle. Volume I. Dalhart Basin

    International Nuclear Information System (INIS)

    1982-09-01

    This area report describes the environmental characteristics of the Dalhart and Palo Duro basins of the Texas Panhandle portion of the Permian basin. Both basins are rather sparsely populated, and the overall population is decreasing. The economic base is centered on agribusiness and manufacturing. Most of the potentially conflicting land uses in both basins (i.e., parks, historic sites) occupy small land areas, with the exception of a national grassland in the Dalhart and military air training routes in both basins. Ground transportation in the Dalhart basin is adequate, and it is well developed in the Palo Duro basin. In both basins irrigation constitutes the principal water use, and groundwater is the principal source. However, the dominant aquifer, the Ogallala, is being depleted. Both basins consist primarily of grasslands, rangelands, and agricultural areas. No critical terrestrial or aquatic habitats have been identified in the basins, though several endangered, threatened, or rare terrestrial species occur in or near the basins. Aquatic resources in both basins are limited because of the intermittent availability of water and the high salt content of some water bodies. Playa lakes are common, though usually seasonal or rain dependent. The climate of the area is semiarid, with low humidity, relatively high wind speeds, and highly variable prcipitation. Restrictive dispersion conditions are infrequent. National ambient secondary air quality standards for particulates are being exceeded in the area, largely because of fugitive dust, although there are some particulate point sources

  4. Laguna Verde annulus pressurization loads evaluation

    International Nuclear Information System (INIS)

    Castaneda, M. A.; Cruz, M. A.; Cardenas, J. B.; Vargas, A.; Cruz, H. J.; Mercado, J. J.

    2010-10-01

    Annulus pressurization, jet impingement, pipe whip restraint and jet thrust are phenomena related to postulated pipe ruptures. A postulated pipe rupture at the weld between recirculation, or feedwater piping and a reactor nozzle safe end, will lead to a high flow rate of flashing water/steam mixture into the annulus between the reactor pressure vessel and the biological shield wall. The total effect of the vessel and pipe inventory blowdown from the break being postulated must be accounted for in the evaluation. A recirculation line break will give rise to an angular dependent short term pressure differential around the vessel, followed by a longer term pressure buildup in the annulus. A recirculation line postulated rupture may not produce worst case conditions and reference to time intervals for only the recirculation break should be treated superficially. A postulated rupture of the feedwater piping may produce the extreme case for determining: 1) the shield wall and reactor vessel to pedestal interactions, 2) loading on the reactor vessel internals, or 3) responses for the balance of piping attached to the vessel. Recently it was identified a potential issue regarding the criteria used to determine which cases were evaluated for Annulus Pressurization (A P) loads for new loads plants. The original A P loads methodology in the late 1970 and early 1980 years separated the mass/energy release calculation from the structural response calculation based on the implicit assumption that the maximum overall mass/energy release will result in maximizing the structural response and corresponding stresses on the reactor pressure vessel, internals, and containment structures. This process did not consider the dynamic response in the primary and secondary safety related structures, components and equipment. Consequently, the A P loads used as input for design adequacy evaluations of Nuclear Steam Supply System safety related components for new loads plants might have

  5. Optimization of reloading Laguna Verde Central U1/U2, Federal Electricity Commission; Optimizacion de recargas Central Laguna Verde U1/U2, Comision Federal de Electricidad

    Energy Technology Data Exchange (ETDEWEB)

    Espinosa G, J.M. [Central Nucleoelectrica Laguna Verde, Carretera Cardel-Nautla Km. 45.5, Municipio de Alto Lucero, Veracruz (Mexico)

    2006-07-01

    The Laguna Verde Central from the beginning of the commercial operation settled down as maximum priority 'the total safety in its operation' taking in consideration the so much experience of the good operation and of multiple recharges made in a sure and reliable way, and without separate us of the safety mystic of the CLV, but looking for to be better every day a new challenge it settled down 'to compare us with the best plants in the world' and certainly to work to classify us like one of them. For this we established a 4.0 year old plan (2003/2006) for the effectiveness all the processes in the power station that allowed us to measure our acting with the same parameters that settle down at international level (nuclear safety, industrial safety, radiological safety, capacity factor, readiness factor, cleaning of the power station, attachment to procedures, attention to the detail and certainly to be competitive in the economic aspect, summing up means to be good in all the aspects). All the above mentioned would allow us to qualify us as level 1 of WANO (world proprietors association of nuclear centrals) at the end of the year 2006 and to pass to be part of this select group. After analyzing the acting record of the power station, evaluating our technical and economic capacity, the location of the installation besides revising the international experiences was defined that one of the concepts that impact considerably so much to the capacity factors and availability besides the dose and production cost is the duration of the recharge periods, for this reason the present work is elaborated. (Author)

  6. Planning of activities in the Laguna Verde Central planning at 12 weeks; Planeacion de Actividades en la Central Laguna Verde planeacion a doce semanas

    Energy Technology Data Exchange (ETDEWEB)

    Chimalpopoca, C. [Comision Federal de Electricidad, Central Laguna Verde, Subgerencia General de Operacion y Planeacion, Veracruz (Mexico)]. e-mail: carlos.chimalpopoca@cfe.gob.mx

    2007-07-01

    The universe of works that are carried out in a nuclear facility to maintain effective the structures, systems and components require of a continuous analysis, in the order of the maintenance frequencies that can be of the preventive, predictive or corrective type. Each component is associated to reserve parts, readiness of systems, in fulfillment to the operation technical specifications, to the environment of the one work; each component requires of a planning level, where it is distinguished with clarity when they are executed, in the operation stage, stop or recharge. This work has as end to show like the activities are planned during the operation, using planning methods to twelve weeks, where the reach of the task is conceptualized, operative requirements, of reserve parts, of the work environment analysis, of those radiological conditions, of the authorizations for their execution, the same execution and the evaluation post work like a technique to maintain in continuous improvement the tasks of the maintenance of the Units of the Power station. A motor valve to be worked in its internals requires access to the work point, it requires bill of the system, electric disconnection, maneuvers to disassemble actuators and retirement of thermal isolation if it applies, reserve parts of the caps joints, control mechanisms, personal, tools, radiological control. The success of the continuous operation of a power station is in the planning quality, the attention of each one of the details to assure that the components, structures and components stay effective to make their function when they are demanded. The planning task requires of experience and knowledge of each some of the components, the task of planning of activities and its execution is multidisciplinary This work has that purpose, to show the planning tools in the Laguna Verde Nuclear Power station, under the concept of twelve weeks. (Author)

  7. Groundwater arsenic in the Verde Valley in central Arizona, USA

    International Nuclear Information System (INIS)

    Foust, R.D.; Mohapatra, P.; Compton-O'Brien, A.-M.; Reifel, J.

    2004-01-01

    Forty-one water samples were collected and analyzed from throughout the Verde Valley watershed to identify the source of As in well water used for domestic and agricultural purposes. Each water sample was analyzed for anions, cations and trace chemical constituents by atomic absorption spectroscopy, anion chromatography and traditional wet chemical procedures. Arsenic concentrations ranged from 10 to 210 μg/l, with the highest values observed for water pooled on tailings from an abandoned Cu mine. Geostatistical analysis of the data revealed the primary source of As to be groundwater in contact with the Supai and Verde formations, as opposed to runoff from the abandoned mine tailings. Montezuma Well, a collapsed travertine spring, contained the highest levels of naturally occurring As (> 100 μg/l). Arsenic in Montezuma Well water was shown to be 100% arsenate. X-ray absorbance near edge spectra (XANES) of Potomogeton illinoiensis, an endemic plant species of Montezuma Well, demonstrate that As is absorbed as arsenate, reduced to arsenite in the plant and retained as an organic glutathione complex. XANES spectra of Montezuma Well sediments show 4 forms of As present: arsenate (∼54%), As(III)-glutathione complex (∼32%) and an As-organic complex (∼14%) containing dimethylarsinic acid and arsenobetaine. This is the first report of As(III)-glutathione in sediments

  8. Geotourism, Medical Geology and local development: Cape Verde case study

    Science.gov (United States)

    Rocha, F.; Ferreira da Silva, E.

    2014-11-01

    Geotourism and Geoparks in particular are real opportunities to rural developments promoting the rate decline of unemployment and emigration through engaging the local communities in geopark activities and tourism marketing in the form of adventure tourism, ecotourism, rural tourism and health geotourism. Geotourism is closely linked with Medical Geology. The intake of minerals and chemical elements for food, water, soil (through geophagy) or dust can be accomplished by ingestion, inhalation or dermal absorption. Pelotherapy or “Mudtherapy” is the use of mud/clay for therapeutic applications, internal or external. Cape Verde archipelago is located in Atlantic ocean, 400 km westwards of Senegal coast. Geotourism is being developed, mainly focused on the development of a geopark in Fogo island huge caldera, but also trying to take advantage of their potentialities for Geomedecine. A cooperative program established between Cape Verde University (UCV) and Aveiro University (UA, Portugal) is under way, aiming, on a first stage, to identify Geotouristic potentialities and, on a second stage, to develop products. Geotourism is being developed, mainly focused on the development of a geopark in Fogo isl. huge caldera, but also trying to take advantage of their potentialities for Geomedecine.

  9. Groundwater arsenic in the Verde Valley in central Arizona, USA

    Energy Technology Data Exchange (ETDEWEB)

    Foust, R.D.; Mohapatra, P.; Compton-O' Brien, A.-M.; Reifel, J

    2004-02-01

    Forty-one water samples were collected and analyzed from throughout the Verde Valley watershed to identify the source of As in well water used for domestic and agricultural purposes. Each water sample was analyzed for anions, cations and trace chemical constituents by atomic absorption spectroscopy, anion chromatography and traditional wet chemical procedures. Arsenic concentrations ranged from 10 to 210 {mu}g/l, with the highest values observed for water pooled on tailings from an abandoned Cu mine. Geostatistical analysis of the data revealed the primary source of As to be groundwater in contact with the Supai and Verde formations, as opposed to runoff from the abandoned mine tailings. Montezuma Well, a collapsed travertine spring, contained the highest levels of naturally occurring As (> 100 {mu}g/l). Arsenic in Montezuma Well water was shown to be 100% arsenate. X-ray absorbance near edge spectra (XANES) of Potomogeton illinoiensis, an endemic plant species of Montezuma Well, demonstrate that As is absorbed as arsenate, reduced to arsenite in the plant and retained as an organic glutathione complex. XANES spectra of Montezuma Well sediments show 4 forms of As present: arsenate ({approx}54%), As(III)-glutathione complex ({approx}32%) and an As-organic complex ({approx}14%) containing dimethylarsinic acid and arsenobetaine. This is the first report of As(III)-glutathione in sediments.

  10. ¿Qué tan verde es tu mercado?

    Directory of Open Access Journals (Sweden)

    Wilmar R. Olaya-González

    2011-01-01

    Full Text Available El mercado de lo verde y lo ecológico es una tendencia indiscutible en nuestro mundo globalizado, que busca de alguna manera resarcir el daño infringido sobre el medio ambiente. Más allá de simple altruismo, la ecología se ha convertido en una moda, de la cual unos y otros toman ventaja a su mejor acomodo, haciendo del mercado de productos y servicios su tribuna; eco-diseño, planes de responsabilidad social y ambiental, campañas por el reciclaje y consumo de productos "más amigables" con el medio ambiente hacen parte del panorama que se intenta describir en esta reseña. Por medio de un estudio de caso, se hará énfasis en cómo la comunicación asume un papel crucial en la verdadera apropiación del concepto de "consumidor verde" y "consumidor responsable", de manera que la propuesta transversal de las tic se convierta en una herramienta no solo tecnológica, sino también de empoderamiento del papel que la sociedad puede representar en el cuidado de los recursos naturales.

  11. 76 FR 5218 - Advisory Committee on Reactor Safeguards

    Science.gov (United States)

    2011-01-28

    ..., October 21, 2010 (74 FR 65038-65039). Thursday, February 10, 2011, Conference Room T2-B1, 11545 Rockville... Evaluation Report Associated with the License Renewal Application for the Palo Verde Nuclear Generating... NRC staff and Arizona Public Service Company regarding the final Safety Evaluation Report associated...

  12. Abundancia, diversidad y categoría ecológica de los peces en estero damas y estero palo seco, Costa Rica

    Directory of Open Access Journals (Sweden)

    Hubert Araya

    2016-03-01

    Full Text Available Se trabajó de junio de 1986 a febrero de 1987 en una estación de muestreo en el estero Palo Seco y en dos en el estero Damas (Damas y San Bosco, Pacífico Central, Costa Rica. La temperatura del agua no presentó diferencias significativas entre las estaciones Damas y San Bosco, pero sí entre Damas-Palo Seco y San Bosco-Palo Seco. La salinidad varió significativamente entre las tres estaciones y el pH no mostró diferencias significativas. Se recolectaron representantes de 25 familias, 39 géneros y 54 especies. De las especies, 18 comparten los tres sitios de muestreo, siete se hallaron únicamente en Palo Seco, cinco en Damas y seis en San Bosco. De las especies recolectadas, el 7,41% es compartido entre Palo Seco y Damas; el 3,70% entre Palo Seco y San Bosco y el 22,22% entre Damas y San Bosco. El análisis de similitud determinó que las estaciones Damas y San Bosco comparten un 41,40% de las especies; mientras que Palo Seco solamente presento un 9,9% de especies comunes con el grupo Damas-San Bosco. La mayoría de las especies encontradas fueron de origen marino que utilizan estos dos esteros como área de crianza (42,59% y alimentación (40,74%; mientras que las de agua dulce, estuarinas y visitantes ocasionales están poco representadas. La mayor diversidad se encontró en San Bosco y se detectaron diferencias estadísticamente significativas en los valores de H' entre las estaciones. La mayor similitud de especies se presentó entre las estaciones Damas y San Bosco, lo que sugiere que estas áreas están bajo una mayor influencia de aguas continentales; lo que propicia que los peces estén más ampliamente distribuidos. Se deduce que la ictiofauna de los esteros estudiados es transitoria en los sitios de muestreo y que la misma se distribuye heterogéneamente.

  13. Seasonal patterns in metazoan parasite community of the "Fat Sleeper" Dormitator latifrons (Pisces: Eleotridae from Tres Palos Lagoon, Guerrero, Mexico

    Directory of Open Access Journals (Sweden)

    Juan Violante-González

    2008-09-01

    Full Text Available Dormitator is among the most important fish genera in the Mexican Pacific coastal lagoon systems. In Tres Palos Lagoon, the Fat Sleeper Dormitator latifrons is one of the most significant species based on catch volume, although it is only consumed locally. Very little information exists on this species’ parasitofauna. Composition and temporal variation in the metazoan parasite community structure of Dormitator latifrons from Tres Palos Lagoon (99º47’ W, 16º48’ N, Guerrero, Mexico, were determined using seasonal samples taken between April 2000 and June 2002. Ten parasite species (55 817 individuals were recovered from 219 examined hosts. These species included eight helminths (Ascocotyle (Phagicola longa, Echinochasmus leopoldinae, Clinostomum complanatum, Pseudoacanthostomum panamense, Saccocoelioides lamothei, Parvitaenia cochlearii, Contracaecum sp. and Neoechinorhynchus golvani and two crustaceans (Argulus sp. and Ergasilus sp.. Five of the helminth species exhibited seasonal variation in their infection dynamics associated with environmental changes during the dry and rainy seasons. The variations in the infection dynamics generated changes in the community structure over time. Rev. Biol. Trop. 56 (3: 1419-1427. Epub 2008 September 30.Entre abril del 2000 y junio del 2002 se efectuó un estudio para determinar la composición y la variación temporal en la estructura de la comunidad de parásitos metazoarios del popoyote Dormitator latifrons en la laguna de Tres Palos, Guerrero, México, a partir de muestras temporales. Se recuperaron diez especies de parásitos (55 817 individuos de 219 hospederos examinados. Estas especies incluyeron ocho helmintos (Ascocotyle (Phagicola longa, Echinochasmus leopoldinae, Clinostomum complanatum, Pseudoacanthostomum panamense, Saccocoelioides lamothei, Parvitaenia cochlearii, Contracaecum sp. y Neoechinorhynchus golvani y dos crustáceos (Argulus sp. y Ergasilus sp.. Cinco de las especies de

  14. Improvements to the RELAP/SCDAPSIM of Laguna Verde model for the analysis of transients and accidents; Mejoras al modelo de Laguna Verde de RELAP/SCDAPSIM para el analisis de transitorios y accidentes

    Energy Technology Data Exchange (ETDEWEB)

    Amador G, R.; Castillo D, R.; Ortiz V, J.; Araiza M, E.; Martinez C, E., E-mail: rogelio.castillo@inin.gob.mx [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2016-09-15

    This work presents the improvements to the integral model of the nuclear power plant of Laguna Verde for the RELAP/SCDAPSIM code, for the simulation of transients and severe accidents. The model includes a new detailed geometry of the steam lines, as well as improvements in the performance of the emergency systems. A primary containment model has also been created, which will be used to analyze the effect of safety valve and relief valve discharges to the wet well suppression pool and the effect of the rupture of a recirculation loop on the dry well. The simulations performed with the new model show that the changes made improve the prediction of the phenomenology involved during transients and accidents. (Author)

  15. Participation of the ININ in the activities of radioactive waste management of the Laguna Verde Central; Participacion del ININ en las actividades de gestion de desechos radiactivos de la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Medrano L, M.; Rodriguez C, C.; Linares R, D. [ININ, Gerencia Subsede Sureste (Mexico); Ramirez G, R.; Zarate M, N. [Central Laguna Verde, CFE (Mexico)]. e-mail: maam@nuclear.inin.mx

    2006-07-01

    From the beginning of the operation of the Laguna Verde Central (CLV) the National Institute of Nuclear Research (ININ) has come supporting the CLV in the activities of administration of the humid and dry radioactive waste generated by the operation of the two units of the CLV, from the elaboration of procedures to the temporary storage in site, the implementation of a program of minimization and segregation of dry solid wastes, until the classification of the lots of humid waste and bulk dry wastes. In this work the description of the management activities of radioactive wastes carried out by the ININ in the facilities of the CLV to the date is presented, as well as some actions that they are had drifted in the future near, among those that it stands out the determination of the total alpha activity in humid samples by means of scintillation analysis. (Author)

  16. Nature of the interfacial region between cementitious mixtures and rocks from the Palo Duro Basin and other seal components

    International Nuclear Information System (INIS)

    Wakeley, L.D.; Roy, D.M.

    1986-03-01

    Using the interface zone as an indicator of compatibility, preliminary tests were run using cement-based formulations designed to be used for shaft sealing in conjunction with evaporite and clastic rocks of the Palo Duro Basin, one of several potential sites for a high-level radioactive waste repository. Emphasis focused on two formulations, both designed to be slightly expansive. Mixture 83-05 was tested in combination with anhydrite and siltstone. A comparable mixture (83-03) containing salt was used with the halite. Cement, rocks, and their respective interfaces were examined using x-ray diffraction, optical microscopy, and scanning electron microscopy. Bond strengths between rock and cement as well as between selected steels and grout were determined as a function of curing conditions and pretest surface treatment. Permeabilities of cement/rock and cement/steel composites were also determined. Bond strength and permeability were found to vary with curing conditions as well as surface treatment

  17. Nuclear

    International Nuclear Information System (INIS)

    2014-01-01

    This document proposes a presentation and discussion of the main notions, issues, principles, or characteristics related to nuclear energy: radioactivity (presence in the environment, explanation, measurement, periods and activities, low doses, applications), fuel cycle (front end, mining and ore concentration, refining and conversion, fuel fabrication, in the reactor, back end with reprocessing and recycling, transport), the future of the thorium-based fuel cycle (motivations, benefits and drawbacks), nuclear reactors (principles of fission reactors, reactor types, PWR reactors, BWR, heavy-water reactor, high temperature reactor of HTR, future reactors), nuclear wastes (classification, packaging and storage, legal aspects, vitrification, choice of a deep storage option, quantities and costs, foreign practices), radioactive releases of nuclear installations (main released radio-elements, radioactive releases by nuclear reactors and by La Hague plant, gaseous and liquid effluents, impact of releases, regulation), the OSPAR Convention, management and safety of nuclear activities (from control to quality insurance, to quality management and to sustainable development), national safety bodies (mission, means, organisation and activities of ASN, IRSN, HCTISN), international bodies, nuclear and medicine (applications of radioactivity, medical imagery, radiotherapy, doses in nuclear medicine, implementation, the accident in Epinal), nuclear and R and D (past R and D programmes and expenses, main actors in France and present funding, main R and D axis, international cooperation)

  18. Simulation of overpressure events with a Laguna Verde model for the RELAP code to conditions of extended power up rate; Simulacion de eventos de sobrepresion con un modelo de Laguna Verde para el codigo RELAP a condiciones de aumento de potencia extendido

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez H, A.; Araiza M, E.; Fuentes M, L.; Ortiz V, J., E-mail: andres.rodriguez@inin.gob.mx [ININ, Departamento de Sistemas Nucleares, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2012-10-15

    In this work the main results of the simulation of overpressure events are presented using a model of the nuclear power plant of Laguna Verde developed for the RELAP/SCDAPSIM code. As starting point we have the conformation of a Laguna Verde model that represents a stationary state to similar conditions to the operation of the power station with Extended Power Up rate (EPU). The transitory of simulated pressure are compared with those documented in the Final Safety Analysis Report of Laguna Verde (FSAR). The results of the turbine shot transitory with and without by-pass of the main turbine are showed, and the event of closes of all the valves of main vapor isolation. A preliminary simulation was made and with base in the results some adjustments were made for the operation with EPU, taking into account the Operation Technical Specifications of the power station. The results of the final simulations were compared and analyzed with the content in the FSAR. The response of the power station to the transitory, reflected in the model for RELAP, was satisfactory. Finally, comments about the improvement of the model are included, for example, the response time of the protection and mitigation systems of the power station. (Author)

  19. The Laguna Verde Central by it results in maintenance and operation consolidates it position of world class enterprise; La central Laguna Verde por sus resultados en mantenimiento y operacion consolida su posicion de empresa de clase mundial

    Energy Technology Data Exchange (ETDEWEB)

    Rivera C, A. [CFE, Central Laguna Verde, Km. 42.5 Carretera Cardel- Nautla, Veracruz (Mexico)

    2008-07-01

    This work has the objective of showing the results of the Laguna VerdeCentral in the maintenance and the operation that in the short term the generation of electricity in Mexico by nuclear means is a viable option, in virtue of their positioning like Company of World Class, when winning March 25, 2008 the National Prize of Quality with the more high qualification in the history of this prize, same that allows us to be very optimistic in increasing the possibility to that the Nuclear Industry in Mexico grows. The focus of the comparative graphs, with official data of the Comision Federal de Electricidad (CFE), it is so that it is observed that the Laguna Verde Central is above those the other types of generation like they are the Coal power stations, Thermoelectric, Hydroelectric, likewise they can see that we are for up of the Independent Producers of Energy. The information of the electric power generation is presented by reactors nuclear at world level that is growing, in having 31 Generating Units in the construction process that favors the decisions making in the Government federal, likewise contributed data of the increment projected for 2016 in the country of 380,102 GWh that equivalent to 63% of growth, where it exists without place to doubts a good opportunity for the nucleoelectricity. The Investment Works Program of Public Sector (POISE), it shows the information that 6,178 Mwe will be installed settled of a Non-defined Technology in Mexico, information that specifies the opportunity to be a viable option, because the one Plant Factor, the Production of Electric power, and the Variable Cost of Production, the energy generation by nuclear means is the more competitiveness. Finally this work stood out the effort that communitary works are developed to benefit to the society and the environment to be one Viable option not only for their high performance, or competitive for those more low costs, but also to improve the public opinion with the sustainable

  20. Nuclear power plant status diagnostics using a neural network with dynamic node architecture

    International Nuclear Information System (INIS)

    Basu, A.

    1992-01-01

    This thesis is part of an ongoing project at Iowa State University to develop ANN based fault diagnostic systems to detect and classify operational transients at nuclear power plants. The project envisages the deployment of such an advisor at Iowa Electric Light and Power Company's Duane Arnold Energy Center nuclear power plant located at Palo, IA. This advisor is expected to make status diagnosis in real time, thus providing the operators with more time for corrective measures

  1. Start-up and commercial operation of the Laguna Verde power plants, unit 1

    International Nuclear Information System (INIS)

    Torres R, J.F.

    1991-01-01

    The main features of the unit 1 of the Laguna Verde Power Plant is presented as well as the phases of the start-up process. The process includes various steps and tests up to start the commercial operation. (author)

  2. NPDES Permit for Mesa Verde National Park Water Treatment Plant in Colorado

    Science.gov (United States)

    Under NPDES permit number CO-0034462, the United States Department of the Interior, National Park Service is authorized to discharge from the Mesa Verde National Park water treatment plant, in Montezuma County, Colo.

  3. Effects of past and future groundwater development on the hydrologic system of Verde Valley, Arizona

    Science.gov (United States)

    Garner, Bradley D.; Pool, D.R.

    2013-01-01

    Communities in central Arizona’s Verde Valley must manage limited water supplies in the face of rapidly growing populations. Developing groundwater resources to meet human needs has raised questions about the effects of groundwater withdrawals by pumping on the area’s rivers and streams, particularly the Verde River. U.S. Geological Survey hydrologists used a regional groundwater flow model to simulate the effects of groundwater pumping on streamflow in the Verde River. The study found that streamflow in the Verde River between 1910 and 2005 had been reduced as the result of streamflow depletion by groundwater pumping, also known as capture. Additionally, using three hypothetical scenarios for a period from 2005 to 2110, the study’s findings suggest that streamflow reductions will continue and may increase in the future.

  4. The role of eclogite in the mantle heterogeneity at Cape Verde

    DEFF Research Database (Denmark)

    Barker, Abigail Katrine; Holm, Paul Martin; Troll, Valentin R.

    2014-01-01

    The Cape Verde hotspot, like many other Ocean Island Basalt provinces, demonstrates isotopic heterogeneity on a 100–200 km scale. The heterogeneity is represented by the appearance of an EM1-like component at several of the southern islands and with a HIMU-like component present throughout...... have been limited. We apply the minor elements in olivine approach (Sobolev et al. in Nature 434:590–597, 2005; Science, doi:10.1126/science.1138113, 2007), to determine and quantify the contributions of peridotite, pyroxenite and eclogite melts to the mantle heterogeneity observed at Cape Verde. Cores...... of olivine phenocrysts of the Cape Verde volcanics have low Mn/FeO and low Ni*FeO/MgO that deviate from the negative trend of the global array. The global array is defined by mixing between peridotite and pyroxenite, whereas the Cape Verde volcanics indicate contribution of an additional eclogite source...

  5. New species of Rissoidae from the Cape Verde Islands (Mollusca: Gastropoda) Part 1

    OpenAIRE

    Moolenbeek, R.G.; Rolán, E.

    1988-01-01

    Sediment samples collected at the Cape Verde Islands contained many interesting micromolluscs. Amongst them, four new species of the family Rissoidae ( Alvania peli, A. nicolauensis, A. stocki and A. planciusi).

  6. Laguna Verde simulator: A new TRAC-RT based application

    International Nuclear Information System (INIS)

    Munoz Cases, J.J.; Tanarro Onrubia, A.

    2006-01-01

    In a partnership with GSE Systems, TECNATOM is developing a full scope training simulator for Laguna Verde Unit 2 (LV2). The simulator design is based upon the current 'state-of-the art technology' regarding the simulation platform, instructor station, visualization tools, advanced thermalhydraulics and neutronics models, I/O systems and automated model building technology. When completed, LV2 simulator will achieve a remarkable level of modeling fidelity by using TECNATOM's TRAC-RT advanced thermalhydraulic code for the reactor coolant and main steam systems, and NEMO neutronic model for the reactor core calculations. These models have been utilized up to date for the development or upgrading of nine NPP simulators in Spain and abroad, with more than 8000 hours of training sessions, and have developed an excellent reputation for its robustness and high fidelity. (author)

  7. Techos verdes: una alternativa ecológica

    Directory of Open Access Journals (Sweden)

    Maureen Trebilcock Kelly

    2001-06-01

    Full Text Available Es un hecho que estamos pavimentando nuestro Planeta. Durante el siglo XX, hemos construido aceleradamente ciudades y carreteras, cubriendo y destruyendo, en este proceso, nuestra tierra. Este hecho es más evidente en las áreas urbanas, que aparecen sobrepavimentadas, donde la vegetación cubre apenas un tercio de la superficie, comparado con un 75 a 95% de las áreas rurales. En Chile, las áreas urbanas crecen sin límite aparente, especialmente nuestra capital, con escasez de áreas verdes y con un alarmante aumento en los niveles de contaminación atmosférica y acústica.

  8. O golfe e os rumos do Cabo Verde independente = Golfing and the independent Cape Verde directions = El golf y los caminos del Cabo Verde independiente

    Directory of Open Access Journals (Sweden)

    Melo, Victor Andrade de

    2016-01-01

    Full Text Available Em função de uma série de peculiaridades, o golfe tem desempenhado um importante papel na história de Cabo Verde. A prática, que tem uma longa trajetória no arquipélago, em diversas ocasiões foi mobilizada a fim de materializar a ideia de que o cabo-verdiano era portador de um alto padrão civilizacional. No período colonial, essa foi uma das estratégias pelos nativos usada para lidar com o jugo da metrópole, argumento utilizado para requisitar maior respeito às especificidades e atenção às necessidades locais. O que terá mudado nas considerações sobre esse esporte quando chegou a independência (1975? Que diferenças podem ser sentidas nas décadas seguintes? Neste artigo, argumentamos que os discursos sobre a modalidade nos ajudam a lançar um olhar sobre os debates acerca dos rumos do país insular nos últimos 40 anos

  9. The Laguna Verde Central by it results in maintenance and operation consolidates it position of world class enterprise

    International Nuclear Information System (INIS)

    Rivera C, A.

    2008-01-01

    This work has the objective of showing the results of the Laguna VerdeCentral in the maintenance and the operation that in the short term the generation of electricity in Mexico by nuclear means is a viable option, in virtue of their positioning like Company of World Class, when winning March 25, 2008 the National Prize of Quality with the more high qualification in the history of this prize, same that allows us to be very optimistic in increasing the possibility to that the Nuclear Industry in Mexico grows. The focus of the comparative graphs, with official data of the Comision Federal de Electricidad (CFE), it is so that it is observed that the Laguna Verde Central is above those the other types of generation like they are the Coal power stations, Thermoelectric, Hydroelectric, likewise they can see that we are for up of the Independent Producers of Energy. The information of the electric power generation is presented by reactors nuclear at world level that is growing, in having 31 Generating Units in the construction process that favors the decisions making in the Government federal, likewise contributed data of the increment projected for 2016 in the country of 380,102 GWh that equivalent to 63% of growth, where it exists without place to doubts a good opportunity for the nucleoelectricity. The Investment Works Program of Public Sector (POISE), it shows the information that 6,178 Mwe will be installed settled of a Non-defined Technology in Mexico, information that specifies the opportunity to be a viable option, because the one Plant Factor, the Production of Electric power, and the Variable Cost of Production, the energy generation by nuclear means is the more competitiveness. Finally this work stood out the effort that communitary works are developed to benefit to the society and the environment to be one Viable option not only for their high performance, or competitive for those more low costs, but also to improve the public opinion with the sustainable

  10. Estrategias de mercadeo verde utilizadas por empresas a nivel mundial

    Directory of Open Access Journals (Sweden)

    Castellano, Susie

    2015-09-01

    Full Text Available La preocupación por el medio ambiente se ha convertido en una temática que inquieta a toda la colectividad actual, desde los más pequeños hasta los más grandes, desde la pequeña empresa hasta la gran industria. Sumado a esto, el auge de normativas ambientales que establecen regulaciones al empresario, los obliga a tener una mayor conciencia de los daños que pueden causar sus acciones al medio ambiente. Es por esto, que paulatinamente ha comenzado, por parte de las empresas, la adopción de estrategias en el área de mercadeo verde que les permita comercializar sus productos y servicios de forma que los mismos sean ambientalmente compatibles. En el presente trabajo, se abordaron las diferentes estrategias que han venido asumiendo empresas de diferente índole para hacer frente a tan importante filosofía en el ámbito mundial. Para tal fin, se hizo la revisión y contrastación de artículos escritos en el marco del mercadeo verde por Rivera y Molero (2006, Chamorro (2001, Samper y Echeverri (2008 principalmente, encontrándose que cada vez son más las empresas que se suman a esta forma de mercadear sus procesos y productos y más los consumidores que anteponen criterios ecológicos ante variables de otra índole, modificando sus hábitos de consumo.

  11. Zoanthids of the Cape Verde Islands and their symbionts: previously unexamined diversity in the Northeastern Atlantic

    OpenAIRE

    Reimer, J.D.; Hirose, M.; Wirtz, P.

    2010-01-01

    The marine invertebrate fauna of the Cape Verde Islands contains many endemic species due to their isolated location in the eastern Atlantic, yet research has not been conducted on most taxa here. One such group are the zoanthids or mat anemones, an order of benthic cnidarians (Hexacorallia: Zoantharia) common in many marine environments. In this study, the diversity of zoanthids in the Cape Verde Islands is specifically examined for the first time. Field images and sampling are combined with...

  12. Optimization of reloading Laguna Verde Central U1/U2, Federal Electricity Commission

    International Nuclear Information System (INIS)

    Espinosa G, J.M.

    2006-01-01

    The Laguna Verde Central from the beginning of the commercial operation settled down as maximum priority 'the total safety in its operation' taking in consideration the so much experience of the good operation and of multiple recharges made in a sure and reliable way, and without separate us of the safety mystic of the CLV, but looking for to be better every day a new challenge it settled down 'to compare us with the best plants in the world' and certainly to work to classify us like one of them. For this we established a 4.0 year old plan (2003/2006) for the effectiveness all the processes in the power station that allowed us to measure our acting with the same parameters that settle down at international level (nuclear safety, industrial safety, radiological safety, capacity factor, readiness factor, cleaning of the power station, attachment to procedures, attention to the detail and certainly to be competitive in the economic aspect, summing up means to be good in all the aspects). All the above mentioned would allow us to qualify us as level 1 of WANO (world proprietors association of nuclear centrals) at the end of the year 2006 and to pass to be part of this select group. After analyzing the acting record of the power station, evaluating our technical and economic capacity, the location of the installation besides revising the international experiences was defined that one of the concepts that impact considerably so much to the capacity factors and availability besides the dose and production cost is the duration of the recharge periods, for this reason the present work is elaborated. (Author)

  13. Planning of activities in the Laguna Verde Central planning at 12 weeks

    International Nuclear Information System (INIS)

    Chimalpopoca, C.

    2007-01-01

    The universe of works that are carried out in a nuclear facility to maintain effective the structures, systems and components require of a continuous analysis, in the order of the maintenance frequencies that can be of the preventive, predictive or corrective type. Each component is associated to reserve parts, readiness of systems, in fulfillment to the operation technical specifications, to the environment of the one work; each component requires of a planning level, where it is distinguished with clarity when they are executed, in the operation stage, stop or recharge. This work has as end to show like the activities are planned during the operation, using planning methods to twelve weeks, where the reach of the task is conceptualized, operative requirements, of reserve parts, of the work environment analysis, of those radiological conditions, of the authorizations for their execution, the same execution and the evaluation post work like a technique to maintain in continuous improvement the tasks of the maintenance of the Units of the Power station. A motor valve to be worked in its internals requires access to the work point, it requires bill of the system, electric disconnection, maneuvers to disassemble actuators and retirement of thermal isolation if it applies, reserve parts of the caps joints, control mechanisms, personal, tools, radiological control. The success of the continuous operation of a power station is in the planning quality, the attention of each one of the details to assure that the components, structures and components stay effective to make their function when they are demanded. The planning task requires of experience and knowledge of each some of the components, the task of planning of activities and its execution is multidisciplinary This work has that purpose, to show the planning tools in the Laguna Verde Nuclear Power station, under the concept of twelve weeks. (Author)

  14. Three stops of fuel reloading with length of less 30 days in the Laguna Verde Central

    International Nuclear Information System (INIS)

    Lozano L, A.

    2007-01-01

    The Laguna Verde Central having established as mission 'With maximum priority in the safety, to generate electricity by nuclear means with quality and cost competitive, sustained in our personnel's continuous overcoming and deep respect to the environment' and respecting our values (safety, responsibility by results, professional integrity, continuous improving, team working, excellence in the acting, quality of service, protection to the environment) they thought about our strategic objectives of the power station being born this way one of them that it is the program of improvement 'Reduction of reload times' looking for to be improves every day comparing us with the best plants in the world efficient all the processes in the power station that allowed us to measure our acting with the same parameters that settle down at international level like they are nuclear safety, industrial safety, radiological safety, capacity factor, readiness factor, cleaning of the power station attachment to procedures, attention to the detail and certainly to be competitive in the economic aspect. After analyzing the acting record of the power station, evaluating our technical capacity, economic, the location of the installation besides revising the international experiences it was defined that one of the concepts that impact considerably so much to the capacity and readiness factors besides the dose and production cost is the duration of the reload periods, for this reason they were elaborated work strategies to be able to reach our goal of reload days considered in being able to carry out them in less than 30 days, here the actions carried out that they made us complete the three last reloads in less than 30 days are captured. (Author)

  15. La sostenibilidad y el debate nuclear

    Directory of Open Access Journals (Sweden)

    Amparo Vilches

    2008-01-01

    Full Text Available Las centrales nucleares están siendo presentadas como “solución verde” al problema energético, debido a que no conllevan emisiones de CO2. En este artículo se pretende poner de manifiesto que, sin embargo, esta indudable ventaja va acompañada de muy serios inconvenientes que obligan a rechazar la opción nuclear.

  16. Is a changing climate affecting the tropical cyclone behavior of Cape Verde?

    Science.gov (United States)

    Emmenegger, T. W.; Mann, M. E.; Evans, J. L.

    2016-12-01

    An existing dataset of synthetic tropical cyclone (TC) tracks derived from climate change simulations were used to explore TC variability within a 250 km radius of the Cape Verde Islands (16.5388N, 23.0418W). The synthetic sets were examined according to genesis point location, track projection, intensity, frequency, and seasonality within the observational era (1851 AD to present). These factors of TC variability have been shown to be strongly related to climate oscillations, thus the historical era was grouped by the increasing and decreasing regimes of sea surface temperature (SST) in the main development region (MDR) of the Atlantic Ocean. Numerous studies have examined Atlantic Basin activity throughout this era; the goal of this study is to investigate possible variations in TC behavior around Cape Verde, ultimately determining whether Cape Verde experiences similar fluctuations in activity as observed basin-wide. We find that several facets of TC variability such as intensity, seasonality, and genesis point location around Cape Verde are not significantly different to that of the entire basin, thus forecasts of the entire basin in these respects may also apply to our site. A long-term trend of increasing TC frequency can be identified basin-wide within the observed set, yet activity around Cape Verde does not display this same behavior observably or in any synthetic set. A relationship between the location of genesis points and the regimes of SST fluctuation is shown to be existent. We find both more observed and synthetic genesis points within the vicinity of Cape Verde during cool periods, and an eastward and equatorward shift in cyclogenesis is evident during warm regimes. This southeastern shift in genesis points attributes to the increased intensities of TCs seen during periods of warmer SST. Years of increased SST are additionally linked to an earlier seasonality in Cape Verde.

  17. HLA polymorphisms in Cabo Verde and Guiné-Bissau inferred from sequence-based typing.

    Science.gov (United States)

    Spínola, Hélder; Bruges-Armas, Jácome; Middleton, Derek; Brehm, António

    2005-10-01

    Human leukocyte antigen (HLA)-A, -B, and -DRB1 polymorphisms were examined in the Cabo Verde and Guiné-Bissau populations. The data were obtained at high-resolution level, using sequence-based typing. The most frequent alleles in each locus was: A*020101 (16.7% in Guiné-Bissau and 13.5% in Cabo Verde), B*350101 (14.4% in Guiné-Bissau and 13.2% in Cabo Verde), DRB1*1304 (19.6% in Guiné-Bissau), and DRB1*1101 (10.1% in Cabo Verde). The predominant three loci haplotype in Guiné-Bissau was A*2301-B*1503-DRB1*1101 (4.6%) and in Cabo Verde was A*3002-B*350101-DRB1*1001 (2.8%), exclusive to northwestern islands (5.6%) and absent in Guiné-Bissau. The present study corroborates historic sources and other genetic studies that say Cabo Verde were populated not only by Africans but also by Europeans. Haplotypes and dendrogram analysis shows a Caucasian genetic influence in today's gene pool of Cabo Verdeans. Haplotypes and allele frequencies present a differential distribution between southeastern and northwestern Cabo Verde islands, which could be the result of different genetic influences, founder effect, or bottlenecks. Dendrograms and principal coordinates analysis show that Guineans are more similar to North Africans than other HLA-studied sub-Saharans, probably from ancient and recent genetic contacts with other peoples, namely East Africans.

  18. O verde produtivo na AMP no horizonte 2020

    Directory of Open Access Journals (Sweden)

    Hélder Marques

    2015-06-01

    Full Text Available Pensar a forma como se estruturará o verde produtivo na Área Metropolitana do Porto, num corte temporal que se fecha no horizonte 2020, implica não só um diagnóstico do que ele é, mas também, e sobretudo, a capacidade de compreender as principais alterações em curso, procurando distinguir as que são, ou parecem ser, meramente conjunturais, daquelas que, uma vez instaladas, têm capacidade suficiente para serem determinantes no curto e médio prazo. Depois é necessário estabelecer, em conformidade, os principais objetivos a atingir a partir dos desígnios das políticas públicas consensualizadas, ou seja, quais são os valores de largo espectro a atingir, neste caso a sustentabilidade dos sistemas produtivos, a adequação ambiental e paisagística, a que acresce a criação de valor. São também observadas as condicionantes, até porque o complexo agroflorestal é talvez aquele que, no domínio dos sistemas produtivos de criação de valor, está mais condicionado por decisões que são estranhas à nossa soberania, quer se trate da administração central ou local, quanto mais não fosse porque as políticas de incentivos e preços são essencialmente determinadas pela PAC. Passa-se, depois, a uma caracterização de síntese, recorrendo a um conjunto de indicadores, os quais, uma vez agregados em diferentes variáveis, permitem um maior poder heurístico. Fecha-se com um esboço e tipificação do modelo territorial expectável no curto prazo, assim como dos principais sistemas produtivos que lhe estão associados. Nesse sentido, foram definidos quatro macro territórios, a saber: i -Territórios de “interdição”; ii - Territórios de “renaturalização”; iii - Novos territórios de amenidade e dominância do verde produtivo; iv - Territórios de dominância das fileiras produtivas intensivas.

  19. Chuva de sementes em remanescentes florestais de Campo Verde, MT

    Directory of Open Access Journals (Sweden)

    William Pietro-Souza

    2014-08-01

    Full Text Available O objetivo deste trabalho consistiu em avaliar sazonalmente a produção de sementes provenientes de fragmentos florestais presentes na zona rural de Campo Verde, MT. Essa caracterização ocorreu em termos de produção de sementes e riqueza de espécies vegetais. Foram selecionados três fragmentos florestais caracterizados como Floresta Estacional Semidecidual. Em cada fragmento, cinco coletores foram instalados e confeccionados com canos de PVC (1 m²; malha de náilon de 0,001 m e 0,15 m de profundidade do bojo. O material foi coletado mensalmente, cujas sementes foram quantificadas e separadas conforme a síndrome de dispersão, etapa sucessional e forma de vida. Houve a determinação da densidade, frequência absoluta, índice de diversidade e equitabilidade. Ao todo, foram obtidas 3.622 sementes, pertencentes a 74 táxons. Maiores densidades de sementes foram observadas durante os meses de setembro, outubro e novembro. As lianas Gouania sp., Fridericia speciosa, Heteropterys sp. e Distictella sp. responderam com 55,95% do total de sementes aportadas. Das espécies que compuseram a chuva de sementes, 74% não são dispersas pelo vento. Todavia, quando se verificou a quantidade de diásporos coletados, formas dispersas pelo vento foram predominantes, representando 76% do total. Citam-se como táxons arbóreos importantes para a recomposição florestal na região de Campo Verde, situada no Sudeste de Mato Grosso: Tachigali rubiginosa, Siparuna guianensis, Nectandra sp., Cordia alliodora, Alibertia sp., Terminalia brasiliensis e Myrcia sp. Essas espécies devem ser alvo de estudos mais específicos relacionados ao seu potencial para recuperação de ambientes degradados, considerando-se as Áreas de Preservação Permanente e Reservas Legais.

  20. Well completion report - Harman No. 1 (PD-8) well, Palo Duro Basin, Texas: unanalyzed data

    International Nuclear Information System (INIS)

    1984-05-01

    This report describes the drilling and testing of Harman No. 1 well, located in north-central Swisher county, about 7 miles north of Tulia, Texas. Drilling and testing were performed by Stone and Webster Engineering Corporation as a part of a nationwide program to identify potential locations for a nuclear waste repository. Stone and Webster worked under a contract with the US Department of Energy's Program Manager: Battelle Project Management Division, Office of Nuclear Waste Isolation. This report describes the drilling and testing activities actually performed (compared to the Field Test Plan), describes the problems encountered, and provides recommendations for future work. Data gathered during drilling and testing of the well are included as appendices to this report. Drilling of the well began July 29, 1982, and was completed September 7, 1982, when a cement plug was set between the depths of 1220 and 1400 feet. These data are preliminary. They have been neither analyzed nor evaluated. 5 figures, 4 tables

  1. The geology of Pedra Verde region, Ceara, Brazil

    International Nuclear Information System (INIS)

    Korpershoek, H.R.; Mendonca, J.A.C. de; Torquato, J.R.

    1979-01-01

    The upper Proterozoic Mambira Formation (≥ 1.1000 m.y.) consists of > 1000 m of micaschists with subordinate quartzites and limestones, its upper part, the ''Pedra Verde Phyllite'', is composed of phyelitic slump breccias, with abundance of pyrite. The Mambira formation crops out in the west flank of the tope Anticline, formed by ∼ 600 m of quartzites with sillimanite and/or andalusite (Sao Joaquim Formation), underlain by granitoid gneisses, representing the amphibolite facies. The contact between the Sao Joaquim and Mabira Formations appears to be tectonic. The folding and the metamorphism of the latter date from the Brazilian Cycle, which also affected the gneisses, causing homogeneization of the whole-rock K/Ar ages around 500 m.y. After erosion of some 10.000 m of sedimentary re-activation of the faults, which may already have formed during the deposition of the Mambira Formation resulted in the development of the Ubari Graben. The above formations are unconformably overlain by 300-350 m of subhorizontal Shallow-Marine sandstones belonging to the Serra Grande Formation, of upper silurian to lower devonian ages [pt

  2. Analysis of the stability of events occurred in Laguna Verde

    International Nuclear Information System (INIS)

    Castillo D, R.; Ortiz V, J.; Calleros M, G.

    2005-01-01

    The new fuel designs for operation cycles more long have regions of uncertainty bigger that those of the old fuels, and therefore, they can have oscillations of power when an event is presented that causes that the reactor operates to high power and low flow of coolant. During the start up of the reactor there are continued procedures that avoid that oscillations are presented with that which makes sure the stable behavior of the reactor. However, when the reactor is operating to nominal conditions and they are shot or they are transferred to low speed the recirculation pumps, it cannot make sure that the reactor doesn't present oscillations of power when entering to the restricted operation regions. The methods of stability analysis commonly use signs of neutronic noise that require to be stationary, but after a transitory one where they commonly get lost the recirculation pumps the signs they don't have the required characteristics, for what they are used with certain level of uncertainty by the limited validity of the models. In this work the Prony method is used to determine the reactor stability, starting from signs of transitory and it is compared with autoregressive models. Four events are analyzed happened in the Laguna Verde power plant where the reactor was in the area of high power and low flow of coolant, giving satisfactory results. (Author)

  3. Dating the magmatism of Maio, Cape Verde Islands

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, J G [Newcastle upon Tyne Univ. (UK). School of Physics; Le Bas, M J [Leicester Univ. (UK). Dept. of Geology; Furnes, H [Bergen Univ. (Norway). Geologisk Inst.

    1983-07-01

    Conventional K-Ar and /sup 40/Ar//sup 39/Ar studies of Mesozoic ocean floor basalts and Tertiary plutonic and volcanic rocks from Maio, Cape Verde Islands, have been determined to elucidate the magmatic evolution of this ocean island. Pillow lavas of the Basement Complex yield a minimum age of 113 +- 8 Ma though thermal overprinting of their formation age by the younger Central Intrusive Complex (CIC) and subsequent sheet intrusions is in some cases almost total. Activity in the CIC began before 20 Ma and plutons continued to develop until about 8 Ma, the youngest ages possibly indicating a cooling history of more than 2 Ma for these bodies relative to their volcanic counterparts. Sheet intrusion occurred throughout the period 20 to 9 Ma though the peak of this activity probably occurred 11 Ma ago. Field relations allow the time of thrusting(s) on the Monte Branco Thrust to be bracketed between 9 and 7 Ma. Volcanic activity began in the Tertiary, probably before 12 Ma, and culminated in the development of a stratovolcano at 7 Ma.

  4. “Aunque verde, todo cinturón Aprieta”

    Directory of Open Access Journals (Sweden)

    Eulalia Borja Bedoya

    2016-05-01

    Full Text Available Medellín, en su afán de venderse al mundo como una ciudad de servicios se ha vuelto hipócrita con sus ciudadanos y ha venido construyendo desde los centros de poder trasnacionales unos modelos de ciudad excluyentes, que cada vez intentan acabar con esos que no han tenido mucho, pero que luchan con lo poco, que se han tomado a Medellín y han construido otras maneras de vivirse la ladera, siempre en una lucha constante, reivindicando su derecho a la ciudad; Las laderas de Medellín si bien se han ido conformando en gran parte como cinturones de miseria, al mismo tiempo también lo han hecho como territorios de vida y resistencia. Allá se siembra y se aprende a vivir con dignidad aunque sin mucho dinero, saben qué es lo verde porque vienen del campo y saben cultivar la tierra, son conscientes de que habitan un territorio con agua, árboles, suelos para cuidar y respetar y es por eso que durante todos estos años han sabido hacerse una misma con la montaña que los acogió cuando la ciudad entera les dio la espalda.

  5. Disposal alternatives and recommendations for waste salt management for repository excavation in the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    1987-01-01

    This report documents an evaluation of five alternatives for the disposal of waste salt that would be generated by the construction of a repository for radioactive waste in underground salt deposits at either of two sites in the Palo Duro Basin, Texas. The alternatives include commercial disposal, offsite deep-well injection, disposal in abandoned mines, ocean disposal, and land surface disposal on or off the site. For each alternative a reference case was rated - positive, neutral, or negative - in terms of environmental and dependability factors developed specifically for Texas sites. The factors constituting the environmental checklist relate to water quality impact, water- and land-use conflicts, ecological compatibility, conformity with air quality standards, and aesthetic impact. Factors on the dependability check-list relate to public acceptance, the adequacy of site characterization, permit and licensing requirements, technological requirements, and operational availability. A comparison of the ratings yielded the following viable alternatives, in order of preference: (1) land surface disposal, specifically disposal on tailings piles associated with abandoned potash mines; (2) disposal in abandoned mines, specifically potash mines; and (3) commercial disposal. Approaches to the further study of these three salt management techniques are recommended

  6. Nuclear

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The first text deals with a new circular concerning the collect of the medicine radioactive wastes, containing radium. This campaign wants to incite people to let go their radioactive wastes (needles, tubes) in order to suppress any danger. The second text presents a decree of the 31 december 1999, relative to the limitations of noise and external risks resulting from the nuclear facilities exploitation: noise, atmospheric pollution, water pollution, wastes management and fire prevention. (A.L.B.)

  7. Genetic structure of populations of Drosophila melanogaster natives from Laguna Verde, Veracruz; Estructura genetica de poblaciones de Drosophila melanogaster originarias de Laguna Verde, Veracruz

    Energy Technology Data Exchange (ETDEWEB)

    Salceda, V M [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    2005-07-01

    The genetic variability hidden present in natural populations of Drosophila melanogaster, it has been broadly analyzed, and it is a tool that allows to detect differences among the different populations of this species, so much of natural nature as experimental. In this occasion we use it to see if differences exist in two neighboring populations inside the Laguna Verde nuclear power plant, Veracruz, and this way to suggest, of having differences in the mount of the relative frequencies of lethal genes, semi lethals and normal, be due to the radioactive emanations product of the reactors operation of the plant. Its were took samples of flies in both towns during three successive seasons and they were transported to the laboratory of the ININ where they were carried out the tests to determine the frequency of the different types of genes. This was made by means of the denominated technique C y L / Pm that allows by means of a cross series with a stump marker to obtain, in the third generation, in isolated form the different types of genes and this way to calculate their relative frequencies. The study understands the analysis of 299 chromosomes extracted from the populations, of those that 95 correspond at the control population and 204 to the experimental one. As a result of the analysis we find that 30.52 percent of the genes of the population witness contains detrimental genes (sum of the lethal plus the semi lethal genes) as long as in the experimental population this value corresponds to 23.03 percent. In accordance with this information was not significant difference among the studied populations. A similar analysis, but now comparing the seasons, (summer against winter), it showed significant difference to 5% with regard to the lethal genes frequency only in the population witness. These results indicate the absence of damage, however it is necessary to consider that this can be due to that indeed there is not him or that the investigation protocol is not

  8. 78 FR 34373 - Campo Verde Solar, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2013-06-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13-1541-000] Campo Verde Solar, LLC; Supplemental Notice That Initial Market- Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Campo Verde...

  9. O arquipélago “literopintado”: escritura literária de autoria feminina em Cabo Verde

    Directory of Open Access Journals (Sweden)

    Simone Caputo Gomes

    2010-12-01

    Full Text Available Este artigo tem por objetivo estudar a representação de Cabo Verde pela literatura de autoria feminina, que retrata – lê, pinta, desenha, esculpe, escreve, imagina – suas belas paisagens, seu cotidiano popular, seus perfis de mulher, sua riqueza cultural.Palavras-chave: Literatura feminina; Cabo Verde; Representação cultural.

  10. 77 FR 38280 - Verde Energy USA New York, LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Science.gov (United States)

    2012-06-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-2071-000] Verde Energy USA New York, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Verde Energy USA New York, LLC's application for market-based rate authority, with an accompanying rate...

  11. 78 FR 32240 - Notice of Inent (NOI) To Prepare an Environmental Impact Statement (EIS) for the Oro Verde Solar...

    Science.gov (United States)

    2013-05-29

    ... DEPARTMENT OF DEFENSE Notice of Inent (NOI) To Prepare an Environmental Impact Statement (EIS) for the Oro Verde Solar Project at Edwards Air Force Base and County of Kern, CA AGENCY: Department of the... with the development of the Oro Verde Solar Project (OVSP) on Edwards AFB. The OVSP is a solar...

  12. 76 FR 43684 - Verde Energy USA Trading, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Science.gov (United States)

    2011-07-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11-4041-000] Verde Energy USA Trading, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Verde Energy USA Trading, LLC's application for market-based rate authority, with an accompanying rate...

  13. Analysis of the stability of events occurred in Laguna Verde; Analisis de estabilidad de eventos ocurridos en Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Castillo D, R.; Ortiz V, J. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico); Calleros M, G. [CFE, Central Nucleoelectrica Laguna Verde, Carretera Cardel-Nautla Km. 42.5, Alto Lucero, Veracruz (Mexico)

    2005-07-01

    The new fuel designs for operation cycles more long have regions of uncertainty bigger that those of the old fuels, and therefore, they can have oscillations of power when an event is presented that causes that the reactor operates to high power and low flow of coolant. During the start up of the reactor there are continued procedures that avoid that oscillations are presented with that which makes sure the stable behavior of the reactor. However, when the reactor is operating to nominal conditions and they are shot or they are transferred to low speed the recirculation pumps, it cannot make sure that the reactor doesn't present oscillations of power when entering to the restricted operation regions. The methods of stability analysis commonly use signs of neutronic noise that require to be stationary, but after a transitory one where they commonly get lost the recirculation pumps the signs they don't have the required characteristics, for what they are used with certain level of uncertainty by the limited validity of the models. In this work the Prony method is used to determine the reactor stability, starting from signs of transitory and it is compared with autoregressive models. Four events are analyzed happened in the Laguna Verde power plant where the reactor was in the area of high power and low flow of coolant, giving satisfactory results. (Author)

  14. Relative frequencies of deletereo genes in populations of droshopila Melanogaster from Laguna Verde, Veracruz; Frecuencias relativas de genes deletereos en poblaciones de Drosophila melanogaster originarias de Laguna Verde, Veracruz

    Energy Technology Data Exchange (ETDEWEB)

    Salceda, V. M. [ININ, 52750 La Marquesa, Estado de Mexico (Mexico)]. e-mail: vmss@nuclear.inin.mx

    2008-07-01

    In order to obtain data about the possible changes and/or damages that could cause the operation of the reactors of the nuclear power plant of Laguna Verde to the populations of drosophila Melanogaster that lives in the zone, one carried out one series of biannual collections (summer and winter) during the years 1991-1992 and 1996-1998 to obtain individuals of this species and to subject them to a battery of tests. The flies of this species that it was possible to capture were transported to the Biology Laboratory of the National Institute of Nuclear Research, where they were put under in individual form a series of you cross they allowed that us in the third generation to detect the presence of deletereo genes that following their viability were catalogued like normal, lethal or less lethal according to the methodology of Wallace. This way a total of 933 second chromosomes was analyzed to leave of them the relative frequencies were calculated of each one of the categories, for each sample station. The result of the applied statistical test indicates us that not significant difference exists among the populations and that the differences of having them must only to the environment changes something that usually happen in all the population. For what we can point out that the presence of the reactors does not seem to influence negatively in the behavior of the population that lives in the zone. (Author)

  15. Development of a methodology for the economical analysis of fuel cycles, application to the Laguna Verde central; Desarrollo de una metodologia para el analisis economico de ciclos de combustible, aplicacion a la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Malfavon, S.M.; Trejo, M.G.; Hernandez, H. [FI-UNAM, 04500 Mexico D.F. (Mexico); Francois, J.L.; Ortega, R.F. [FI-UNAM, Paseo Cuauhnahuac 8532, Jiutepec, Morelos (Mexico)

    2003-07-01

    In this work a methodology developed to carry out the economical analysis of the fuel cycle of a nuclear reactor is presented. The methodology was applied to the Laguna Verde Nuclear Power Station (CNLV). The design of the reload scenarios of the CNLV are made with the Core Master Presto code (CM-Presto), three-dimensional simulator of the reactor core, the launched data by this, as well as the information of the Energy use plan (PUE), it allowed us to obtain reliable results through the fitness of an algorithm of economic calculation that considers all the components of the fuel cycle to present worth. With the application of the methodology it was obtained the generated energy, as well as their respective cost of each sub lot type of assemblies by operation cycle, from the start-up of the CNLV until September 13, 2002. Using the present worth method its were moved all the values at November 5, 1988, date of operation beginning. To the final of the analysis an even cost of 6.188 mills/kWh was obtained for those first 9 cycles of the Unit 1 of the CNLV, being observed that the costs of those first 3 operation cycles are the more elevated. Considering only the values starting from the cycle 4, the levelled cost turns out to be of 5.96 mills/kWh. It was also obtained the cost by fuel lot to evaluate the performance of assemble with the same physical composition. (Author)

  16. NucleoRed - Computerized system for increasing the effectiveness of the technical administrative conduct of the Laguna Verde Central; NucleoRed - Sistema computarizado para incrementar la efectividad de la gestion tecnico-administrativa de la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Luna D, J. [Central Nucleoelectrica Laguna Verde, Carretera cardel-Nautla Km. 42.5 Veracruz (Mexico)]. e-mail: jluna@cfe.gob.mx

    2003-07-01

    The on-line systems for the management of the Laguna Verde Central (CLV) have had the challenge to evolve from the PC's of first generation until emigrate to the new Internet technologies, so that they allow to the diverse work groups to have the computer tool that allows them to gather the necessary data and to carry out efficiently the analysis of their results. To confront the previous challenge, in the CLV it has been developed and implemented the Nucleo Red that is an on-line system with the objective of providing in it lines strategic information for the Technician-administrative management of the plant in the nuclear context. The Nucleo Red is the computational tool that reflects the technical administrative processes implemented by personnel of the different Operative departments, it seeks to cooperate to the reliable and efficient operation of the first nucleo electric central of Mexico, with technology and Mexican personnel the one which already it had received international recognitions. The perspective of this computer system is to continue inside the process of continuous improvement and that although it was designed for a nucleo electric plant it can also be taken to the conventional plants of generation of electric power, so that this technology can be taken advantage of in other non nuclear facilities. The objective of the present work, is to show the new modules that have been developed in the Nucleo Red, its operation in general, and the benefits that it presents its use. (Author)

  17. Groundwater resources of Mosteiros basin, island of Fogo, Cape Verde, West Africa

    Science.gov (United States)

    Heilweil, Victor M.; Gingerich, Stephen B.; Plummer, Niel; Verstraeten, Ingrid M.

    2010-01-01

    Groundwater resources in Cape Verde provide water for agriculture, industry, and human consumption. These resources are limited and susceptible to contamination. Additional groundwater resources are needed for continued agricultural development, particularly during times of drought, but increased use and (or) climatic change may have adverse effects on the quantity and quality of freshwater available. In volcanic island aquifers such as those of Cape Verde, a lens of fresh groundwater typically ?floats? upon a layer of brackish water at the freshwater/saltwater boundary, and increased pumping may cause salt water intrusion or other contamination. A recent U.S. Geological Survey study assessed baseline groundwater conditions in watersheds on three islands of Cape Verde to provide the scientific basis for sustainably developing water resources and minimizing future groundwater depletion and contamination.

  18. Low concentrations of persistent organic pollutants (POPs) in air at Cape Verde.

    Science.gov (United States)

    Nøst, Therese Haugdahl; Halse, Anne Karine; Schlabach, Martin; Bäcklund, Are; Eckhardt, Sabine; Breivik, Knut

    2018-01-15

    Ambient air is a core medium for monitoring of persistent organic pollutants (POPs) under the Stockholm Convention and is used in studies of global transports of POPs and their atmospheric sources and source regions. Still, data based on active air sampling remain scarce in many regions. The primary objectives of this study were to (i) monitor concentrations of selected POPs in air outside West Africa, and (ii) to evaluate potential atmospheric processes and source regions affecting measured concentrations. For this purpose, an active high-volume air sampler was installed on the Cape Verde Atmospheric Observatory at Cape Verde outside the coast of West Africa. Sampling commenced in May 2012 and 43 samples (24h sampling) were collected until June 2013. The samples were analyzed for selected polychlorinated biphenyls (PCBs), polybrominated diphenyl ethers (PBDEs), hexachlorobenzene (HCB) and chlordanes. The concentrations of these POPs at Cape Verde were generally low and comparable to remote sites in the Arctic for several compounds. Seasonal trends varied between compounds and concentrations exhibited strong temperature dependence for chlordanes. Our results indicate net volatilization from the Atlantic Ocean north of Cape Verde as sources of these POPs. Air mass back trajectories demonstrated that air masses measured at Cape Verde were generally transported from the Atlantic Ocean or the North African continent. Overall, the low concentrations in air at Cape Verde were likely explained by absence of major emissions in areas from which the air masses originated combined with depletion during long-range atmospheric transport due to enhanced degradation under tropical conditions (high temperatures and concentrations of hydroxyl radicals). Copyright © 2017 The Author(s). Published by Elsevier B.V. All rights reserved.

  19. Bats of Mesa Verde National Park, Colorado: composition, reproduction, and roosting habits.

    Science.gov (United States)

    O'Shea, Thomas J.; Cryan, Paul M.; Snider, E. Apple; Valdez, Ernest W.; Ellison, Laura E.; Neubaum, Daniel J.

    2011-01-01

    We determined the bat fauna at Mesa Verde National Park (Mesa Verde) in 2006 and 2007, characterized bat elevational distribution and reproduction, and investigated roosting habits of selected species. We captured 1996 bats of 15 species in mist nets set over water during 120 nights of sampling and recorded echolocation calls of an additional species. The bat fauna at Mesa Verde included every species of bat known west of the Great Plains in Colorado, except the little brown bat (Myotis lucifugus). Some species showed skewed sex ratios, primarily due to a preponderance of males. Thirteen species of bats reproduced at Mesa Verde. Major differences in spring precipitation between the 2 years of our study were associated with differences in reproductive rates and, in some species, with numbers of juveniles captured. Reduced reproductive effort during spring drought will have a greater impact on bat populations with the forecasted increase in aridity in much of western North America by models of global climate change. We radiotracked 46 bats of 5 species to roosts and describe the first-known maternity colonies of spotted bats (Euderma maculatum) in Colorado. All 5 species that we tracked to diurnal roosts relied almost exclusively on rock crevices rather than trees or snags, despite the presence of mature forests at Mesa Verde and the use of trees for roosts in similar forests elsewhere by some of these species. Comparisons with past bat surveys at Mesa Verde and in surrounding areas suggest no dramatic evidence for effects of recent stand-replacing fires on the composition of the bat community.

  20. The cone snails of Cape Verde: Marine endemism at a terrestrial scale

    Directory of Open Access Journals (Sweden)

    Howard Peters

    2016-07-01

    Full Text Available Cape Verde in the Eastern Atlantic is typical of many island groups in supporting a wealth of endemic species both terrestrial and marine. Marine gastropod molluscs of the genus Conus, commonly known as cone snails, occur in coastal tropical waters throughout the globe, but in Cape Verde their endemism reaches its apogee with 53 out of 56 species occurring nowhere else, the majority of which are restricted to single islands and frequently to single bays. However, Cape Verde is rapidly moving to a tourism-based economy with a projected boom in infrastructure development often coincidental with the shallow-water habitat of many range-restricted Conus. The conservation assessment of Conus to standards of the International Union for the Conservation of Nature (IUCN Red List of Endangered Species, found that 45.3% of 53 species assessed from Cape Verde are threatened or near-threatened with extinction compared to 7.4% of 579 species in the rest of the world. The only three Conus species globally assessed as Critically Endangered and on the cusp of extinction are all endemic to Cape Verde. Our analysis of Conus species distribution, together with spatial data of coastal protected areas and tourism development zones, identify important areas for future research and new marine protection. Our findings show that endemism with its associated risks for Conus in Cape Verde has worldwide parallels with many non-marine taxa, while our proposed strategy for Conus conservation extends beyond the confines of the country and this taxonomic group.

  1. Well completion report - Holtzclaw No. 1 (PD-10) well, Palo Duro Basin, Texas: unanalyzed data

    International Nuclear Information System (INIS)

    1984-05-01

    This report describes the drilling and testing of the Holtzclaw No. 1 well, located in south-central Randall County, approximately 2 miles north of Happy, Texas. Drilling and testing were performed by Stone and Webster Engineering Corporation as part of a nationwide program to identify potential locations for a nuclear waste repository. This report describes the drilling and testing activities actually performed (compared to the Field Test Plan), describes the problems encountered, and provides recommendations for future work. Data gathered during drilling and testing of the well are included as appendices to this report. Drilling of the well began March 1, 1983. The well was drilled to a total depth of 2884.4 feet and was capped on April 1, 1983. These data are preliminary. They have been neither analyzed nor evaluated

  2. Well completion report - Zeeck No. 1 (PD-7) well, Palo Duro Basin, Texas: unanalyzed data

    International Nuclear Information System (INIS)

    1984-05-01

    The drilling and testing of Zeeck No. 1 well, located in central Swisher County, about 4 miles east of Tulia, Texas, are described. Drilling and testing were performed by Stone and Webster Engineering Corporation as a part of a nationwide program to identify potential locations for a nuclear waste repository. This report describes the drilling and testing activities actually performed (compared to the Field Test Plan), describes the problems encountered, and provides recommendations for future work. Data gathered during drilling and testing of the well are included as appendices to this report. Drilling and testing of the well were completed in 125 days from the spud date on April 9, 1982, to demobilization on August 12, 1982. These data are preliminary. They have been neither analyzed nor evaluated

  3. Well completion report - G. Friemel No. 1 (PD-5) well, Palo Duro Basin, Texas: unanalyzed data

    International Nuclear Information System (INIS)

    1984-05-01

    This report provides a brief description and history of the drilling and testing program conducted at the G. Friemel No. 1 well, located in eastern Deaf Smith County about 4 miles north of Dawn, Texas. Drilling and testing were performed by Stone and Webster Engineering Corporation as a part of a nationwide program to identify potential locations for a nuclear waste repository. Figures showing site layout and final well design are provided. Testing programs are described, and stratigraphic data derived from the well are summarized. Data derived from geophysical well logs, drill-stem tests, and other testing programs are presented in the appendixes. Drilling of the well started on February 23, 1982, and was completed on March 31, 1982, at a total depth of 2710 feet. These data are preliminary. They have been neither analyzed nor evaluated

  4. Well completion report - Detten No. 1 (PD-6) well, Palo Duro Basin, Texas: unanalyzed data

    International Nuclear Information System (INIS)

    1984-05-01

    The drilling and testing of Detten No. 1 well, located in Deaf Smith County, about 8 miles north of Hereford, Texas, are described. Drilling and testing were performed by Stone and Webster Engineering Corporation as a part of a nationwide program to identify potential locations for a nuclear waste repository. This report describes the drilling and testing activities actually performed (compared to the Field Test Plan), describes the problems encountered, and provides recommendations for future work. Data gathered during drilling and testing of the well are included as appendices to this report. Drilling of the well began February 26, 1982. The drilling and testing activities terminated at a total depth of 2839 feet and were completed on May 5, 1982. These data are preliminary. They have been neither analyzed nor evaluated

  5. Well completion report - J. Friemel No. 1 (PD-9) well, Palo Duro Basin, Texas: unanalyzed data

    International Nuclear Information System (INIS)

    1984-05-01

    This report describes the drilling and testing of J. Friemel No. 1 well, located in north-central Deaf Smith County, approximately 17 miles north of Hereford, Texas. Drilling and testing were performed by Stone and Webster Engineering Corporation as a part of a nationwide program to identify potential locations for a nuclear waste repository. This report describes the drilling and testing activities actually performed (compared to the Field Test Plan), describes the problems encountered, and provides recommendations for future work. Data gathered during drilling and testing of the well are included as appendices to this report. Rigging up and drilling of the rat and mouse holes began on October 15, 1982. The rig was demobilized on March 18, 1983. These data are preliminary. They have been neither analyzed nor evaluated

  6. NucleoRed - Computerized system for increasing the effectiveness of the technical administrative conduct of the Laguna Verde Central

    International Nuclear Information System (INIS)

    Luna D, J.

    2003-01-01

    The on-line systems for the management of the Laguna Verde Central (CLV) have had the challenge to evolve from the PC's of first generation until emigrate to the new Internet technologies, so that they allow to the diverse work groups to have the computer tool that allows them to gather the necessary data and to carry out efficiently the analysis of their results. To confront the previous challenge, in the CLV it has been developed and implemented the Nucleo Red that is an on-line system with the objective of providing in it lines strategic information for the Technician-administrative management of the plant in the nuclear context. The Nucleo Red is the computational tool that reflects the technical administrative processes implemented by personnel of the different Operative departments, it seeks to cooperate to the reliable and efficient operation of the first nucleo electric central of Mexico, with technology and Mexican personnel the one which already it had received international recognitions. The perspective of this computer system is to continue inside the process of continuous improvement and that although it was designed for a nucleo electric plant it can also be taken to the conventional plants of generation of electric power, so that this technology can be taken advantage of in other non nuclear facilities. The objective of the present work, is to show the new modules that have been developed in the Nucleo Red, its operation in general, and the benefits that it presents its use. (Author)

  7. Development of a methodology for the economical analysis of fuel cycles, application to the Laguna Verde central

    International Nuclear Information System (INIS)

    Malfavon, S.M.; Trejo, M.G.; Hernandez, H.; Francois, J.L.; Ortega, R.F.

    2003-01-01

    In this work a methodology developed to carry out the economical analysis of the fuel cycle of a nuclear reactor is presented. The methodology was applied to the Laguna Verde Nuclear Power Station (CNLV). The design of the reload scenarios of the CNLV are made with the Core Master Presto code (CM-Presto), three-dimensional simulator of the reactor core, the launched data by this, as well as the information of the Energy use plan (PUE), it allowed us to obtain reliable results through the fitness of an algorithm of economic calculation that considers all the components of the fuel cycle to present worth. With the application of the methodology it was obtained the generated energy, as well as their respective cost of each sub lot type of assemblies by operation cycle, from the start-up of the CNLV until September 13, 2002. Using the present worth method its were moved all the values at November 5, 1988, date of operation beginning. To the final of the analysis an even cost of 6.188 mills/kWh was obtained for those first 9 cycles of the Unit 1 of the CNLV, being observed that the costs of those first 3 operation cycles are the more elevated. Considering only the values starting from the cycle 4, the levelled cost turns out to be of 5.96 mills/kWh. It was also obtained the cost by fuel lot to evaluate the performance of assemble with the same physical composition. (Author)

  8. FOGO-2014: Monitoring the Fogo 2014 Eruption, Cape Verde

    Science.gov (United States)

    Fernandes, Rui; Faria, Bruno

    2015-04-01

    Fogo volcano, located in the Cape Verde Archipelago offshore Western Africa, is a complete stratovolcano system that was created by the Cape Verde hotspot, forming the island of Fogo. The top (Pico do Fogo) reaches ~2830m above sea level, and raises ~1100m above Chã das Caldeiras, an almost flat circular area with approximately 10 kilometres in the north-south direction and 7 kilometres in the east-west direction. Chã das Caldeiras, surrounded towards the West by the ~1000m high Bordeira rampart, has been inhabited since the early 20th Century, because it is one of the most productive agricultural areas in this semi-arid country. Fogo volcano erupted on November 23, 2014 (~10:00UTC) on a subsidiary vent of the main cone, after 19 years of inactivity. C4G (Collaboratory for Geosciences), a distributed research infrastructure created in 2014 in the framework of the Portuguese Roadmap for Strategic Research Infrastructures, immediately offered support to the Cape Verdean authorities, with the goal of complementing the permanent geophysical monitoring network operated in Fogo island by INMG, the Cape Verdean Meteorological and Geophysical Institute. This permanent network is composed of seven seismographic stations and three tiltmeter stations, and the data is transmitted in real time to the INMG geophysical laboratory in São Vicente Island, where it is analysed on a routine basis. Pre-eruptive activity started to be detected by the permanent monitoring network on October 2014, with earthquakes occurring at depths larger than 15 km. These events led to a first volcanic warning to the Cape Verdean Civil Protection Agency. On November 22 several volcano-tectonic earthquakes were recorded at shallow depths, indicating shallow fracturing. On the basis of this activity, INMG issued a formal alert of an impending eruption to the Civil Protection Agency, ~24 hours before the onset of the eruption. Volcanic tremor and clear tiltmeter signals were recorded about one hour

  9. Revestimentos biodegradaveis para conservação do coco 'anão verde'

    OpenAIRE

    Josane Maria Resende

    2007-01-01

    Resumo: A água de coco verde é extremamente perecível após a colheita dos frutos e sua qualidade está diretamente relacionada às condições do ambiente de armazenagem. Portanto, são necessárias tecnologias que permitam a conservação do coco verde por um período superior a trinta dias para que o fruto possa ser exportado e comercializado mantendo a água em condições apropriadas para o consumo ao natural. O presente trabalho teve o objetivo de desenvolver revestimentos biodegradáveis para prolon...

  10. Red continua de espacios públicos verdes a escala municipal: el caso de Madrid

    OpenAIRE

    Casado Postigo, Pablo

    2015-01-01

    La ubicación marginal y el aislamiento de los Parques Urbanos implican infrautilización y deterioro de los mismos. Su interconexión mediante una red verde peatonal con limitaciones al tráfico rodado, supone una puesta en valor de todo el sistema de espacios libres y zonas verdes de la ciudad y un importante incentivo para desviar determinados flujos rodados a otras vías cercanas, rescatando así, espacios urbanos a favor del peatón. Esta conexión ayuda a minimizar la fragmentación del espacio ...

  11. Oral receptivity of Aedes aegypti from Cape Verde for yellow fever, dengue, and chikungunya viruses.

    Science.gov (United States)

    Vazeille, Marie; Yébakima, André; Lourenço-de-Oliveira, Ricardo; Andriamahefazafy, Barrysson; Correira, Artur; Rodrigues, Julio Monteiro; Veiga, Antonio; Moreira, Antonio; Leparc-Goffart, Isabelle; Grandadam, Marc; Failloux, Anna-Bella

    2013-01-01

    At the end of 2009, 21,313 cases of dengue-3 virus (DENV-3) were reported in the islands of Cape Verde, an archipelago located in the Atlantic Ocean 570 km from the coast of western Africa. It was the first dengue outbreak ever reported in Cape Verde. Mosquitoes collected in July 2010 in the city of Praia, on the island of Santiago, were identified morphologically as Aedes aegypti formosus. Using experimental oral infections, we found that this vector showed a moderate ability to transmit the epidemic dengue-3 virus, but was highly susceptible to chikungunya and yellow fever viruses.

  12. The apid cuckoo bees of the Cape Verde Islands (Hymenoptera, Apidae).

    Science.gov (United States)

    Straka, Jakub; Engel, Michael S

    2012-01-01

    The apid cuckoo bees of the Cape Verde Islands (Republic of Cape Verde) are reviewed and five species recognized, representing two genera. The ammobatine genus Chiasmognathus Engel (Nomadinae: Ammobatini), a specialized lineage of cleptoparasites of nomioidine bees is recorded for the first time. Chiasmognathus batelkaisp. n. is distinguished from mainland African and Asian species. The genus Thyreus Panzer (Apinae: Melectini) is represented by four species - Thyreus denoliisp. n., Thyreus batelkaisp. n., Thyreus schwarzisp. n., and Thyreus aistleitnerisp. n. Previous records of Thyreus scutellaris (Fabricius) from the islands were based on misidentifications.

  13. Confort térmico en espacios verdes urbanos de ambientes áridos.

    OpenAIRE

    Alejandra Kurbán; Mario Cúnsulo

    2017-01-01

    En la planificación bioclimática de las ciudades y particularmente las ubicadas en  ambientes áridos, los espacios verdes representan un potencial  higrotérmico desaprovechado como mitigadores del clima urbano. El trabajo cuantifica el confort térmico de espacios verdes urbanos (EVU) de una ciudad del centro-oeste de Argentina localizada en la Diagonal Árida Sudamericana, a partir del Índice UTCI.  Este índice se calcula a partir de mediciones climáticas en 19 EVU, realizadas en el verano del...

  14. A new species of Spauligodon (Nematoda: Oxyurida: Pharyngodonidae) in geckos from São Nicolau Island (Cape Verde) and its phylogenetic assessment.

    Science.gov (United States)

    Jorge, Fátima; Carretero, Miguel A; Perera, Ana; Harris, D James; Roca, Vicente

    2012-02-01

    A new nematode species, Spauligodon nicolauensis n. sp., is described from geckos Tarentola bocagei and Tarentola nicolauensis on the island of São Nicolau, Cape Verde. The new nematode was found in the pellets obtained directly from the geckos in a non-invasive fashion, and its identity was assessed both at morphologic and genetic levels. The new species has morphological similarities with Spauligodon tarentolae Spaul, 1926, also parasitizing geckos from the Canary Islands. However, the male cloacal region in the new species is distinct, presenting a different shape of the caudal papillae. The overall resemblance probably resulted from colonization via descent from an ancestor of S. tarentolae carried by the ancestor of Cape Verde Tarentola. The analysis of nuclear DNA sequences confirms that the new species is phylogenetically distinct from all other Spauligodon species already analyzed, forming a group clearly separated from species parasitizing lacertid lizards. The COI genetic distance suggests that the S. nicolauensis n. sp. found in the 2 species of geckos in São Nicolau Island may have resulted from a host-switching event, when they came into contact after the unification of the island.

  15. PREFACE: XXXIV Symposium on Nuclear Physics

    Science.gov (United States)

    Barrón-Palos, Libertad; Bijker, Roelof

    2011-10-01

    In the present volume of the Journal of Physics: Conference Series we publish the proceedings of the 'XXXIV Symposium on Nuclear Physics', which was held from 4-7 January 2011 at the Hacienda Cocoyoc, Morelos, Mexico. The proceedings consist of 19 contributions that were presented as invited talks at the meeting. The abstracts of all contributions, plenary talks and posters were published in the Conference Handbook. The Symposium on Nuclear Physics has a long and distinguished history. From the beginning it was intended to be a relatively small meeting designed to bring together some of the leading nuclear scientists in the field. Its most distinctive feature is to provide a forum for specialists in different areas of nuclear physics, both theorists and experimentalists, students, postdocs and senior scientists, in a relaxed and informal environment providing them with a unique opportunity to exchange ideas. From the first meeting in Oaxtepec in 1978, the Symposium has been organized every year without interruption, which makes the present Symposium the 34th in a row. The scientific program consisted of 27 invited talks and 17 posters on a wide variety of hot topics in contemporary nuclear physics, ranging from the traditional fields of nuclear structure (Draayer, Pittel, Van Isacker, Fraser, Lerma, Cejnar, Hirsch, Stránský and Rath) and nuclear reactions (Aguilera, Gómez-Camacho, Scheid, Navrátil and Yennello) to radioactive beams (Padilla-Rodal and Galindo-Uribarri), nuclear astrophysics (Aprahamian, Civitarese and Escher), hadronic physics (Bijker, Valcarce and Hess), fundamental symmetries (Liu, Barrón-Palos and Baessler) and LHC physics (Menchaca-Rocha and Paic). The high quality of the talks, the prestige of the speakers and the broad spectrum of subjects covered in the meeting, shows that nuclear physics is a very active area at the frontier of scientific research which establishes bridges between many different disciplines. Libertad Barrón-Palos

  16. Modernization and power uprate of the Laguna Verde Nuclear Power Plant (Mexico); Modernizacion y aumento de potencia de la Central Nuclear Laguna Verde (Mexico)

    Energy Technology Data Exchange (ETDEWEB)

    Ruiz, L.; Merino, A.; Garcia-Serrano, J. L.

    2012-11-01

    The objective of this project is to perform the modifications on the thermal cycle of the plant required by an Extended Power Update, to achieve a safe and reliable operation of the plant at 120% of its original thermal power. The scope includes the design, engineering, training, supply of equipment, dismantling, installation, testing and commissioning. The duration of the project is 4,5 years (2007-2011), and all the modifications have been implemented in four outages, two per unit. The main modification carried out are the change of the condenser, moisture separator and main steam reheaters, the feedwater haters, the turbogenerator and its auxiliaries, transformers, isolated phase bus and main circuit breaker, etc. In this paper, the results obtained after all the modifications will be introduced. In addition, the most representative experience will be presented, as well as the lessons learned during the Project execution. (Author)

  17. Modernization and power increase nuclear power plant Laguna Verde (Mexico); Modernizacion y aumento de potencia de la central nuclear Laguna Verde (Mexico)

    Energy Technology Data Exchange (ETDEWEB)

    Garcia-Serrano, J. L.; Merino, A.; Ruiz Gutierrez, L.

    2011-07-01

    The objective of this project is to perform the modifications on the thermal cycle of the plant required by an Extended Power Uprate, to achieve a safe and reliable operation of the plant at 120% of its original thermal power. The scope includes the design, engineering training, supply of equipment, dismantling, installation, testing and commissioning. The duration of the project is 4 years (82007-2010), and all the modifications have been implemented in four outages, two per unit. The main modification carried out are the change of the condenser, moisture separator and main steam reheaters, the feedwater haters, the turbogenerator and its auxiliaries, transformers, isolated phase bus and main circuit breaker, etc. (Author)

  18. Disequilibrium study of natural radionuclides of uranium and thorium series in cores and briny groundwaters from Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Laul, J.C.; Smith, M.R.

    1988-05-01

    The concentrations of natural radionuclides of the 238 U and /232/Th series are reported in several cores and in ten deep and five shallow briny groundwaters from various formations in the Palo Duro Basin. The formations include Granite Wash, Pennsylvanian Granite Wash, Wolfcamp Carbonate, Pennsylvanian Carbonate, Seven River, Queen Grayburg, San Andres, Yates and Salado. The natural radionuclide data in cores suggest that the radionuclides have not migrated or been leached for at least a period of about 1 million years. Relative to the U and Th concentrations in cores, the brines are depleted by a factor of 10 4 to 10 5 , indicating extremely low solubility of U and Th in brines. The natural radionuclide data in brines suggest that radium is not sorbed significantly and thus not retarded in nine deep brines. Radium is somewhat sorbed in one deep brine of Wolfcamp Carbonate and significantly sorbed in shallow brines. Relative to radium, the U, Th, Pb, Bi, and Po radionuclides are highly retarded by sorption. The retardation factors for 228 Th range from 10 2 to 10 3 , whereas those for 230 Th and 234 U range from 10 3 to 10 5 , depending on the formation. The 234 U/ 238 U ratios in these brines are constant at about 1.5. The magnitude of the 234 U/ 230 Th ratio appears to reflect the degree of redox state of the aquifer's environment. The 234 U/ 230 Th ratio in nine deep brines is about unity, suggesting that U, like Th +4 , is in the +4 state, which in turn suggests a reduced environment. 49 refs., 23 figs., 18 tabs

  19. Martin Chalfie y la proteína verde fluorescente Martin Chalfie y la proteína verde fluorescente

    Directory of Open Access Journals (Sweden)

    Zacarías Pereira Vega

    2012-12-01

    Full Text Available The history of the green fluorescent protein (GFP starts with Osamu Shimomura at the beginning of the 1960s, with his discovery from the extracts of the Aequorea victoria jellyfish. However, it is not until the beginning of the 1990s, that the neurobiologist Martin Chalfie, applying genetic engineering tech- niques, achieved for the first time the heterology expression of the GFP in prokaryotes (E. coli and eukaryotes (Caernohabditis elegans, from a clone of the jellyfish’s gen that codifies the GFP prepared by Douglas Prasher. Besides fluorescing in green, the results from this work also demonstrated that it does not require any other cofactor or enzyme of the jellyfish for its expression or for the own forming of a fluorophore. At the same time, Chalfie proposed that the GFP could be used for the marking of cells on living ani- mals or the tag of proteins. Based upon these results, many scientists started working on research related to the GFP; actually this protein is used on different fields such as biotechnol- ogy, development biology, environmental chemistry and medicine. In the case of the latter, it has helped to elucidate the cellular mechanisms from which diseases are made of. Science owes Roger Tsien, amongst other contributions, the creation of differ- ent mutations of the GFP.La historia de la proteína verde fluorescente (GFP se inicia con Osamu Shimomura a principios de la década de 1960, con su descubrimiento de esta proteína a partir de extractos de la medusa Aequorea victoria. Sin embargo, es a principios de la década de 1990 que el neurobiólogo Martin Chalfie, aplicando técnicas de ingeniería genética, logra por primera vez la expresión heteróloga de la GFP en procariotas (Escherichia coli y eucariotas (Caernohabditis elegans, a partir de un clon del gen de la medusa que codifica a la GFP, preparado por Douglas Prasher. Además de fluorescer en verde, los resultados de este trabajo también demostraron que no se

  20. Organic geochemistry of deep ground waters from the Palo Duro Basin, Texas: implications for radionuclide complexation, ground-water origin, and petroleum exploration

    International Nuclear Information System (INIS)

    Means, J.L.; Hubbard, N.J.

    1985-05-01

    This report describes the organic geochemistry of 11 ground-water samples from the Palo Duro Basin, Texas and discusses the implications of their organic geochemical compositions in terms of radionuclide complexation, ground-water origin, and the petroleum potential of two candidate repository sites in Deaf Smith and Swisher Counties. Short-chain aliphatic acid anions are the principal organic constituents present. Stability constant data and simple chemical equilibria calculations suggest that short-chain aliphatic acids are relatively weak complexing agents. The extent of complexation of a typical actinide by selected inorganic ligands present in these brines is expected to far outweigh actinide complexation by the aliphatic acid anions. Various lines of evidence suggest that some portion of the bromide concentrations in the brines is derived from the same source as the short-chain aliphatic acid anions. When the postulated organic components are subtracted from total bromide concentrations, the origins of the Palo Duro brines, based on chloride versus bromide relationships, appear largely consistent with origins based on isotopic evidence. The short-chain aliphatic acid anion content of the Palo Duro brines is postulated to have been much greater in the geologic past. Aliphatic acid anions are but one of numerous petroleum proximity indicators, which consistently suggest a greater petroleum exploration potential for the area surrounding the Swisher County site than the region encompassing the candidate site in Deaf Smith County. Short-chain aliphatic acid anions appear to provide a useful petroleum exploration tool as long as the complex reactions that may dimish their concentrations in ground water are recognized. 71 refs., 10 figs., 10 tabs

  1. Soil and Water Conservation Strategies in Cape Verde (Cabo Verde in Portuguese and Their Impacts on Livelihoods: An Overview from the Ribeira Seca Watershed

    Directory of Open Access Journals (Sweden)

    Isaurinda Baptista

    2015-01-01

    Full Text Available Severe land degradation has strongly affected both people’s livelihood and the environment in Cape Verde (Cabo Verde in Portuguese, a natural resource poor country. Despite the enormous investment in soil and water conservation measures (SWC or SLM, which are visible throughout the landscape, and the recognition of their benefits, their biophysical and socioeconomic impacts have been poorly assessed and scientifically documented. This paper contributes to filling this gap, by bringing together insights from literature and policy review, field survey and participatory assessment in the Ribeira Seca Watershed through a concerted approach devised by the DESIRE project (the “Desire approach”. Specifically, we analyze government strategies towards building resilience against the harsh conditions, analyze the state of land degradation and its drivers, survey and map the existing SWC measures, and assess their effectiveness against land degradation, on crop yield and people’s livelihood. We infer that the relative success of Cape Verde in tackling desertification and rural poverty owes to an integrated governance strategy that comprises raising awareness, institutional framework development, financial resource allocation, capacity building, and active participation of rural communities. We recommend that specific, scientific-based monitoring and assessment studies be carried out on the biophysical and socioeconomic impact of SLM and that the “Desire approach” be scaled-up to other watersheds in the country.

  2. The nuclear power electricity an opportunity for Mexico. Final report

    International Nuclear Information System (INIS)

    Fernandez de la Garza, R.; Garcia, C. F.; Trejo R, S.; Zazueta R, T.; Castaneda G, M. A.; Cruz B, H. J.; Mercado V, J. J.

    2009-01-01

    Inside this document the outstanding information is presented included in the report that develops the technical, financial, environmental and social aspects to consider for the incorporation from a new power plant to the national interconnected system, which was elaborated and presented to the nuclear power plant of Laguna Verde in August of 2009. The treated topics are: the nuclear power electricity, the experience of Laguna Verde, advanced reactors to consider for a new nuclear power plant, environmental aspects, costs of a new nuclear power plant, financing, socioeconomic impact. This work was prepared to evaluate the feasibility of building a new unit of nuclear power plant in Mexico before the evident resurgence at world level of use of nuclear energy to generate electricity. It is important that Mexico maintains inside its development programs and construction, to the nuclear power electricity like a viable and sure alternative of generating electricity, being able to take advantage of experience won with the operation of Laguna Verde, allowing that the country has diverse technologies for electricity generation and have technical capacity to manage the tip technology. (Author)

  3. EFEITO DA ADUBAÇÃO VERDE NA CULTURA DO MILHO (Zea mays L.

    Directory of Open Access Journals (Sweden)

    Maxwel Rodrigues Nascimento

    2017-03-01

    Full Text Available A adubação verde consiste no cultivo de diferentes espécies vegetais em uma mesma área, em sucessão ou simultaneamente com a finalidade principal de melhorar a fertilidade do solo. Prefere-se assim, aquelas que produzam maior volume de matéria seca, estejam menos sujeitas a pragas e doenças e que possuam sementes relativamente uniformes e fáceis de semear. As plantas da família Fabaceae são as mais utilizadas na adubação verde por apresentarem elevado potencial em fixar o nitrogênio atmosférico.  Objetivou-se com a realização deste trabalho elaborar uma revisão de literatura sobre o rendimento da cultura do milho em consórcio e sucessão às espécies vegetais utilizadas para adubação verde. Com base nos resultados obtidos é possível inferir que a prática da adubação verde na cultura do milho é viável, além de melhorar a fertilidade e as características físicas do solo diminui a dependência por adubos minerais.

  4. Optimizing soil and water management in dryland farming systems in Cabo Verde

    NARCIS (Netherlands)

    Santos Baptista Costa, Dos I.

    2016-01-01

    “Optimizing Soil and Water Management in Dryland Farming Systems in Cabo Verde”

    Isaurinda Baptista

    Summary

    Soil and land degradation poses a great challenge for sustainable development worldwide and, in Cabo Verde, has strongly affected both

  5. Verde urbano e processi ambientali: per una progettazione di paesaggio multifunzionale

    Directory of Open Access Journals (Sweden)

    Raffaele Pelorosso

    2013-04-01

    Full Text Available L’impermeabilizzazione delle superfici determina un’alterazione del sistema idrologico, con un incremento dei volumi e dei picchi dei deflussi delle acque meteoriche. Il fenomeno è destinato a progredire, sia per il contributo che vi deriva dalla costante crescita delle superfici urbanizzate (urban sprawl, sia per i cambiamenti climatici in atto, che accentuano la frequenza delle piogge critiche. Una serie di misure e tecniche (Best Management Practices, BMPs sono state sviluppate per la gestione sostenibile delle acque meteoriche urbane. Alcune  BMPs (es: verde pensile, bacini di detenzione/ritenzione, zone umide possono svolgere inoltre una funzione ecologica (divenendo habitat per specie animali e vegetali, di termoregolazione, estetica e di promozione del capitale sociale. È quindi necessario sperimentare metodologie di progettazione e gestione del verde urbano e periurbano, la cui multifunzionalità consente di perseguire la strada della sostenibilità ambientale. Su tale traccia, questo lavoro presenta un percorso metodologico orientato a valutare alcune strategie integrate di controllo dei deflussi urbani, attraverso l’aumento della permeabilità di alcune parti sensibili di città. Il verde, quindi, non è visto come semplice infrastruttura necessaria a soddisfare generici standard urbanistici, ma ne sono analizzate le funzionalità, in questa prima fase di carattere idrologico, ma che, in prospettiva, con la stessa armatura verde, esso può assumere un ruolo ecologico, sociale, di mitigazione del clima e di emissione di gas clima-alteranti.

  6. Cape Verde Report on the Observance of Standards and Codes : Accounting and Auditing

    OpenAIRE

    World Bank

    2012-01-01

    This Report on the Observance of Standards and Codes (ROSC) provides an assessment of the strengths and weaknesses of the existing financial reporting infrastructure that underpins financial accounting and auditing practices in Cape Verde. The assessment focuses on six pillars of financial reporting infrastructure: statutory framework, professional education and training, accountancy profe...

  7. Geochemical stratigraphy of submarine lavas (3-5 Ma) from the Flamengos Valley, Santiago, Cape Verde

    DEFF Research Database (Denmark)

    Barker, Abigail K; Holm, Paul Martin; Peate, David W.

    2009-01-01

    New high-precision Pb-Sr-Nd isotope, major and trace element and mineral chemistry data are presented for the submarine stage of ocean island volcanism on Santiago, one of the southern islands of the Cape Verde archipelago. Pillow basalts and hyaloclastites in the Flamengos Valley are divided...

  8. Mesa Verde: A Study of Man in an Agricultural Setting. Student Manual.

    Science.gov (United States)

    Community Health Service (DHEW/PHS), Bethesda, MD.

    This student manual contains information and guides to assist the secondary student in functioning as an archeologist. Included are fables, pictures for analysis, a time line and description of the pre-history of Mesa Verde, Colorado. The manual concludes with artifact identification word sheets. A related document is ED 001 722. (AWW)

  9. Immigration and Resiliency: Unpacking the Experiences of High School Students from Cape Verde and Ethiopia

    Science.gov (United States)

    Hersi, Afra Ahmed

    2011-01-01

    This article explores the complex factors, both individual and social, that contribute to the resiliency and academic achievement of six adolescent African immigrant students from Cape Verde and Ethiopia who were enrolled in a small high school in the United States. The school was designed specifically for recent adolescent immigrant students.…

  10. Synthesis of Upper Verde River research and monitoring 1993-2008

    Science.gov (United States)

    Daniel G. Neary; Alvin L. Medina; John N. Rinne

    2012-01-01

    This volume is a state-of-knowledge synthesis of monitoring and research conducted on the Upper Verde River (UVR) of Arizona. It contains information on the history, hydrology, soils, geomorphology, vegetation, and fish fauna of the area that can help land managers and other scientists in successfully conducting ecosystem management and future monitoring and research...

  11. Promoting Distance Education in Higher Education in Cape Verde and Mozambique

    Science.gov (United States)

    Ramos, Fernando; Taju, Gulamo; Canuto, Louisette

    2011-01-01

    Over the past six years, the authors have been project leaders for three distance education initiatives in Cape Verde and Mozambique: (1) a blended learning master's degree in multimedia in education for faculty in Cape Verdean public higher education institutions (2005-2008); (2) a teacher training programme for 1375 elementary teachers provided…

  12. Verde plant bug is associated with cottong boll rot in South Texas cotton

    Science.gov (United States)

    Verde plant bug was the dominant boll-feeding sucking bug species (>98% of insects collected using a beat bucket) from peak to late bloom in cotton fields near the coast along the Coastal Bend of South Texas, from Port Lavaca to the Lower Rio qrande Valley in 2010 and 2011. It was common in fields w...

  13. Environmental Education Evaluation at the School: An Example in Sao Nicolau Island, Cape Verde

    Science.gov (United States)

    Graziani, Pietro; Cabral, Daniel; Santana, Nelson

    2013-01-01

    Monte Gordo Natural Park (MGNP) is part of the Cape Verde (CV) Protected Areas National Network. In order to create an effective Environmental Education (EE) curriculum, it is crucial to first identify the level of environmental knowledge of both teachers and students. In 2007 we implemented a set of four surveys to students and educators and…

  14. Impacts of the Conservation Education Program in Serra Malagueta Natural Park, Cape Verde

    Science.gov (United States)

    Burnett, Edmund; Sills, Erin; Peterson, M. Nils; DePerno, Christopher

    2016-01-01

    Environmental and conservation education programs are commonly offered in the rapidly expanding network of protected areas in developing countries. There have been few evaluations of these programs and their impacts on participants. At Serra Malagueta Natural Park in Cape Verde, we assessed changes in environmental knowledge, opinions, and…

  15. Lotus alianus, a new species from Cabo Verde and nomeenclatural notes on Lotus section Pedrosia (Fabaceae)

    Science.gov (United States)

    Lotus alianus J.H. Kirkbr., sp. nov., is described and illustrated. It is a rare endemic species from the Republic of Cape Verde, and is found in dry habitats on just two islands, Ilhas de Santo Antao and Sao Vicente. In addition, two species names are synonymized with L. creticus L., and a lectotyp...

  16. The volcanic and geochemical development of São Nicolau, Cape Verde Islands

    DEFF Research Database (Denmark)

    Duprat, Helene Inga; Holm, Paul Martin; Sherson, Jacob Friis

    2007-01-01

    We present 34 new age results from 40 Ar/39 Ar incremental heating analyses of groundmass separates from volcanic rocks from São Nicolau, Cape Verde. Combining the age results with field observations, we show that the volcanic activity that formed the island occurred in four separate stages: 1: >6...

  17. A volcanological and geochemical investigation of Boa Vistta, Cape Verde Islands

    DEFF Research Database (Denmark)

    Dyhr, Charlotte Thorup; Holm, Paul Martin

    2009-01-01

    Boa Vista, the easternmost island in the Cape Verde archipelago, consists of volcanic products, minor intrusions and a thin partial sedimentary cover. The first 15 age results from 40Ar/39Ar incremental heating analysis of groundmass separates from volcanic and plutonic rocks from Boa Vista are p...

  18. Mesa Verde: A Study of Man in an Agricultural Setting. Library Packet.

    Science.gov (United States)

    Community Health Service (DHEW/PHS), Bethesda, MD.

    This collection of secondary readings contains general information about the ecology of living space, and specific information about the prehistory ecology of Mesa Verde, Colorado. There is also a section on how anthropologists use trees to date artifacts. A related document is indexed as ED 001 721. (AWW)

  19. Zoanthids of the Cape Verde Islands and their symbionts: previously unexamined diversity in the Northeastern Atlantic

    NARCIS (Netherlands)

    Reimer, J.D.; Hirose, M.; Wirtz, P.

    2010-01-01

    The marine invertebrate fauna of the Cape Verde Islands contains many endemic species due to their isolated location in the eastern Atlantic, yet research has not been conducted on most taxa here. One such group are the zoanthids or mat anemones, an order of benthic cnidarians (Hexacorallia:

  20. Ancient mortars from Cape Verde: mineralogical and physical characterization

    Science.gov (United States)

    Rocha, Fernando; Costa, Cristiana; Velosa, Ana; Quintela, Ana; Terroso, Denise; Marques, Vera

    2014-05-01

    Times and locations of different building constructions means different knowledge, habits, different construction methods and materials. The study and safeguarding of the architectural heritage takes nowadays a progressive importance as a vehicle for transmission of cultures and history of nations. The coatings are of great importance in the durability of a building due to the protective role of the masonry. The compatibility between the materials with which they are executed (masonry, mortar and grout settlement) promotes the proper functioning of the wall and a consequent increase in durability. Therefore, it becomes important to study and characterize the mortar coating of buildings to know its characteristics and to use compatible materials in the rehabilitation and maintenance of buildings. This study aims to characterize the chemical, physical, mechanical and mineralogical mortar samples collected in buildings in three islands of Cape Verde, for the conservation, rehabilitation and preservation of them. The collected samples belong to buildings constructed in the end of XIX century and in the beginning of XX century. In order to characterize the mortar samples some tests was made, such as X-Ray Diffraction, X- Ray Fluorescence, acid attack and mechanical strength. The samples were divided into three groups depending on origin; so we have a first group collected on the island of Santiago, the second on the island of Saint Vincent and the third on the island of Santo Antao. The samples are all carbonated, but Santiago samples have a lower carbonates content. In terms of insoluble residue (from the acid attack) it was concluded that the samples have similar value ranging from 9 to 26%. The compressive strength of the mortars have a range between 1.36 and 4.55 MPa, which is related to the presence of more binder in samples with higher resistance. The chemical and mineralogical analyzes showed that these consist of lime mortars (binder), natural pozzolan and

  1. From introduced American weed to Cape Verde Islands endemic: the case of Solanum rigidum Lam. (Solanaceae, Solanum subgenus Leptostemonum).

    Science.gov (United States)

    Knapp, Sandra; Vorontsova, Maria S

    2013-01-01

    A Solanum species long considered an American introduction to the Cape Verde Islands off the west coast of Africa is identified as Solanum rigidum, a member of the Eggplant clade of Old World spiny solanums (Solanum subgenus Leptostemonum) and is probably endemic to the Cape Verde Islands. Collections of this species from the Caribbean are likely to have been introduced from the Cape Verde Islands on slave ships. We discuss the complex nomenclatural history of this plant and provide a detailed description, illustration and distribution map. The preliminary conservation status of Solanum rigidum is Least Concern, but needs to be reassessed in light of its endemic rather than introduced status.

  2. Comunidad de parásitos metazoarios de la charra Cichlasoma trimaculatum en la laguna de Tres Palos, Guerrero, México Metazoan parasite community in the three-spot cichlid Cichlasoma trimaculatum from Tres Palos Lagoon, Guerrero, Mexico

    Directory of Open Access Journals (Sweden)

    Juan Violante-González

    2008-12-01

    Full Text Available Entre abril de 2000 y noviembre de 2002 se examinó la composición de la comunidad de parásitos metazoarios de la charra, Cichlasoma trimaculatum a partir de muestras temporales. Fueron recuperadas 12 especies de parásitos (40 969 individuos de 231 hospederos examinados; 10 helmintos: Ascocotyle (Phagicola longa, Austrodiplostomum compactum, Cladocystis trifolium, Clinostomum complanatum, Crassicutis cichlasomae, Posthodiplostomum minimum, Pseudoacanthostomum panamense, Neoechinorhynchus golvani, Southwellina hispida y Contracaecum sp., y 2 crustáceos: Argulus sp. y Ergasilus sp. La comunidad se caracterizó por un número mayor de parásitos generalistas y pocos especialistas de cíclidos, además por ser pobre en especies. De las 5 especies comunes dentro de la comunidad, 4 presentaron variación temporal en su dinámica de infección a lo largo del tiempo, la cual fue asociada con cambios ambientales generados durante las temporadas de secas y lluvias. La variación en la dinámica de infección de las especies comunes fue capaz de generar cambios en la estructura, tanto en el nivel de componente como en el de infracomunidad; sin embargo, no se observó un patrón claro, lo que indica que la comunidad puede ser poco predecible, como se sugiere para otras comunidades de parásitos de peces dulceacuícolas.We analyzed metazoan parasite community composition in the three-spot cichlid Cichlasoma trimaculatum using seasonal samples taken between April 2000 and November 2002 from the Tres Palos Lagoon, Guerrero, Mexico. A total of 231 hosts were examined. Of the 12 parasite species recovered (40,969 individuals, 10 were helminths: Ascocotyle (Phagicola longa, Austrodiplostomum compactum, Cladocystis trifolium, Clinostomum complanatum, Crassicutis cichlasomae, Posthodiplostomum minimum, Pseudoacanthostomum panamense, Neoechinorhynchus golvani, Southwellina hispida, and Contracaecum sp. The remaining 2 were the crustaceans Argulus sp. and

  3. Near-field receiving water monitoring of trace metals and a benthic community near the Palo Alto Regional Water Quality Control Plant in south San Francisco Bay, California: 2014

    Science.gov (United States)

    Cain, Daniel J.; Thompson, Janet K.; Crauder, Jeff; Parcheso, Francis; Stewart, Robin; Kleckner, Amy E.; Dyke, Jessica; Hornberger, Michelle I.; Luoma, Samuel N.

    2015-01-01

    Trace-metal concentrations in sediment and in the clam Macoma petalum (formerly reported as Macoma balthica), clam reproductive activity, and benthic macroinvertebrate community structure were investigated in a mudflat 1 kilometer (km) south of the discharge of the Palo Alto Regional Water Quality Control Plant (PARWQCP) in South San Francisco Bay, Calif. This report includes the data collected by U.S. Geological Survey (USGS) scientists for the period January 2014 to December 2014. These append to long-term datasets extending back to 1974, and serve as the basis for the City of Palo Alto’s Near-Field Receiving Water Monitoring Program, initiated in 1994. 

  4. Larvicidal activity against Aedes aegypti of Foeniculum vulgare essential oils from Portugal and Cape Verde.

    Science.gov (United States)

    Rocha, Diara Kady; Matosc, Olivia; Novoa, Maria Teresa; Figueiredo, Ana Cristina; Delgado, Manuel; Moiteiro, Cristina

    2015-04-01

    Dengue is a potentially fatal mosquito-borne infection with 50 million cases per year and 2.5 billion people vulnerable to the disease. This major public health problem has recurrent epidemics in Latin America and occurred recently in Cape Verde and Madeira Island. The lack of anti-viral treatment or vaccine makes the control of mosquito vectors a high option to prevent virus transmission. Essential oil (EO) constituents can affect insect's behaviour, being potentially effective in pest control. The present study evaluated the potential use of Foenicultm vulgare (fennel) EO in the control of the dengue vector Aedes aegypti. EOs isolated from fennel aerial parts collected in Cape Verde and from a commercial fennel EO of Portugal were analysed by NMR, GC and GC-MS. trans-Anethole (32 and 30%, respectively), limonene (28 and 18%, respectively) and fenchone (10% in both cases) were the main compounds identified in the EOs isolated from fennel from Cape Verde and Portugal, respectively. The larvicidal activity of the EOs and its major constituents were evaluated, using WHO procedures, against third instar larvae ofAe. aegypti for 24 h. Pure compounds, such as limonene isomers, were also assayed. The lethal concentrations LC50, C90 and LC99 were determined by probit analysis using mortality rates of bioassays. A 99% mortality of Ae. aegypti larvae was estimated at 37.1 and 52.4 µL L-1 of fennel EOs from Cape Verde and Portugal, respectively. Bioassays showed that fennel EOs from both countries displayed strong larvicidal effect against Ae. aegypti, the Cape Verde EO being as active as one of its major constituents, (-)-limonene.

  5. Training in fundamentals of radiological coverage in Laguna Verde NPP; Entrenamiento de fundamentos de coberturas radiologicas en la CLV

    Energy Technology Data Exchange (ETDEWEB)

    Lara H, M. A., E-mail: marcolarah@gmail.com [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Carretera Cardel-Nautla Km. 42.5, Alto Lucero, Veracruz (Mexico)

    2014-10-15

    In 2010, the Institute of Nuclear Power Operations (INPO) celebrates the Knowledge Transfer and Retention Workshop, an event where nuclear regulators and operators presented the strategies that various NPP to worldwide were implemented to mitigate the consequences of this generational change and take advantage of it, the trend in the presented works was the same: the generational change occurs in a faster way that the transfer of knowledge, the future was already here and many NPP had not been adequately prepared to train its nuclear technicians and engineers in the tasks demanded by the industry of them, so in addition to preparing these workers to forced marches was necessary to establish strategies to retain at more experienced staff in the industry. The Laguna Verde NPP has not been exempt to this process; the preparation of personnel squares to replace those that reaching retirement age in the Comision Federal de Electricidad (CFE) has become extensive in the last five years, sometimes leading to have personnel covering functions without an alternate to the next lower position, the cause? Not enough staff. In the specific case of radiation protection (Rp) the time required for obtaining the status of Rp technician according to the ANSI/ANS 3.1 standard is 2 years, one of the tasks that most occupies part of these two years is training in radiological coverage, this training requires a mix of knowledge and experience, recently one of the concepts used for training in Rp is the evaluation and management of the radiological risk, topic that is considered in this technical work. (Author)

  6. Present status and prospects of nuclear power in Mexico

    International Nuclear Information System (INIS)

    Eibenschutz, J.

    1987-01-01

    Mexico decided to build its first nuclear power plant at the end of 1972. Actual construction in Laguna Verde started in early 1977 and after several changes in the structure of the project, CFE has taken full responsibility for engineering and construction since 1981 of the first- and for the time being the only-nuclear power project.The first unit is in the process of commissioning and operation is planned for 1987. (author)

  7. A mathematical model; Un modelo matematico para el comportamiento de la radiosensibilidad medida con la viabilidad huevo-adulto de Drosophila melanogaster y D. simulans de Laguna Verde, Veracruz

    Energy Technology Data Exchange (ETDEWEB)

    Castillo M, J.A.; Pimentel P, A.E. [Instituto Nacional de Investigaciones Nucleares, A.P. 18-1027, 11801 Mexico D.F. (Mexico)

    2000-07-01

    This work presents the results to define the adult egg viability behavior (VHA) of two species, Drosophila melanogaster and D. simulans obtained with the mathematical model proposed, as well as the respective curves. The data are the VHA result of both species coming from the vicinity of the Laguna Verde Nuclear Power plant (CNLV) comprise a 10 years collect period starting from 1987 until 1997. Each collect includes four series of data which are the VHA result obtained after treatment with 0, 4, 6 and 8 Gy of gamma rays. (Author)

  8. Genetic structure of populations of Drosophila melanogaster natives from Laguna Verde, Veracruz

    International Nuclear Information System (INIS)

    Salceda, V.M.

    2005-01-01

    The genetic variability hidden present in natural populations of Drosophila melanogaster, it has been broadly analyzed, and it is a tool that allows to detect differences among the different populations of this species, so much of natural nature as experimental. In this occasion we use it to see if differences exist in two neighboring populations inside the Laguna Verde nuclear power plant, Veracruz, and this way to suggest, of having differences in the mount of the relative frequencies of lethal genes, semi lethals and normal, be due to the radioactive emanations product of the reactors operation of the plant. Its were took samples of flies in both towns during three successive seasons and they were transported to the laboratory of the ININ where they were carried out the tests to determine the frequency of the different types of genes. This was made by means of the denominated technique C y L / Pm that allows by means of a cross series with a stump marker to obtain, in the third generation, in isolated form the different types of genes and this way to calculate their relative frequencies. The study understands the analysis of 299 chromosomes extracted from the populations, of those that 95 correspond at the control population and 204 to the experimental one. As a result of the analysis we find that 30.52 percent of the genes of the population witness contains detrimental genes (sum of the lethal plus the semi lethal genes) as long as in the experimental population this value corresponds to 23.03 percent. In accordance with this information was not significant difference among the studied populations. A similar analysis, but now comparing the seasons, (summer against winter), it showed significant difference to 5% with regard to the lethal genes frequency only in the population witness. These results indicate the absence of damage, however it is necessary to consider that this can be due to that indeed there is not him or that the investigation protocol is not

  9. Impact of flow induced vibration acoustic loads on the design of the Laguna Verde Unit 2 steam dryer

    International Nuclear Information System (INIS)

    Forsyth, D. R.; Wellstein, L. F.; Theuret, R. C.; Han, Y.; Rajakumar, C.; Amador C, C.; Sosa F, W.

    2015-09-01

    Industry experience with Boiling Water Reactors (BWRs) has shown that increasing the steam flow through the main steam lines (MSLs) to implement an extended power up rate (EPU) may lead to amplified acoustic loads on the steam dryer, which may negatively affect the structural integrity of the component. The source of these acoustic loads has been found to be acoustic resonance of the side branches on the MSLs, specifically, coupling of the vortex shedding frequency and natural acoustic frequency of safety relief valves (SRVs). The resonance that results from this coupling can contribute significant acoustic energy into the MSL system, which may propagate upstream into the reactor pressure vessel steam dome and drive structural vibration of steam dryer components. This can lead to high-cycle fatigue issues. Lock-in between the vortex shedding frequency and SRV natural frequency, as well as the ability for acoustic energy to propagate into the MSL system, are a function of many things, including the plant operating conditions, geometry of the MSL/SRV junction, and placement of SRVs with respect to each other on the MSLs. Comision Federal de Electricidad and Westinghouse designed, fabricated, and installed acoustic side branches (ASBs) on the MSLs which effectively act in the system as an energy absorber, where the acoustic standing wave generated in the side-branch is absorbed and dissipated inside the ASB. These ASBs have been very successful in reducing the amount of acoustic energy which propagates into the steam dome. In addition, modifications to the Laguna Verde Nuclear Power Plant Unit 2 steam dryer have been completed to reduce the stress levels in critical locations in the dryer. The objective of this paper is to describe the acoustic side branch concept and the design iterative processes that were undertaken at Laguna Verde Unit 2 to achieve a steam dryer design that meets the guidelines of the American Society of Mechanical Engineers, Boiler and Pressure

  10. Impact of flow induced vibration acoustic loads on the design of the Laguna Verde Unit 2 steam dryer

    Energy Technology Data Exchange (ETDEWEB)

    Forsyth, D. R.; Wellstein, L. F.; Theuret, R. C.; Han, Y.; Rajakumar, C. [Westinghouse Electric Company LLC, Cranberry Township, PA 16066 (United States); Amador C, C.; Sosa F, W., E-mail: forsytdr@westinghouse.com [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Km 42.5 Carretera Cardel-Nautla, 91680 Alto Lucero, Veracruz (Mexico)

    2015-09-15

    Industry experience with Boiling Water Reactors (BWRs) has shown that increasing the steam flow through the main steam lines (MSLs) to implement an extended power up rate (EPU) may lead to amplified acoustic loads on the steam dryer, which may negatively affect the structural integrity of the component. The source of these acoustic loads has been found to be acoustic resonance of the side branches on the MSLs, specifically, coupling of the vortex shedding frequency and natural acoustic frequency of safety relief valves (SRVs). The resonance that results from this coupling can contribute significant acoustic energy into the MSL system, which may propagate upstream into the reactor pressure vessel steam dome and drive structural vibration of steam dryer components. This can lead to high-cycle fatigue issues. Lock-in between the vortex shedding frequency and SRV natural frequency, as well as the ability for acoustic energy to propagate into the MSL system, are a function of many things, including the plant operating conditions, geometry of the MSL/SRV junction, and placement of SRVs with respect to each other on the MSLs. Comision Federal de Electricidad and Westinghouse designed, fabricated, and installed acoustic side branches (ASBs) on the MSLs which effectively act in the system as an energy absorber, where the acoustic standing wave generated in the side-branch is absorbed and dissipated inside the ASB. These ASBs have been very successful in reducing the amount of acoustic energy which propagates into the steam dome. In addition, modifications to the Laguna Verde Nuclear Power Plant Unit 2 steam dryer have been completed to reduce the stress levels in critical locations in the dryer. The objective of this paper is to describe the acoustic side branch concept and the design iterative processes that were undertaken at Laguna Verde Unit 2 to achieve a steam dryer design that meets the guidelines of the American Society of Mechanical Engineers, Boiler and Pressure

  11. Atividade das glicosidases na presença de chá verde e de chá preto

    OpenAIRE

    Pereira,L.L.S.; Souza,S.P.; Silva,M.C; Carvalho,G.A.; Santos,C.D.; Corrêa,A.D.; Abreu,C.M.P.

    2010-01-01

    Várias plantas têm sido consideradas produtos terapêuticos, dentre elas destacam-se os chás verde e preto, popularmente utilizados para controle da hiperglicemia e obesidade. Objetivou-se neste trabalho avaliar o potencial inibitório sobre as enzimas α-amilase, α e β-glicosidases e o teor de compostos fenólicos do chá verde e do chá preto. O teor de compostos fenólicos encontrados foram de 80,8 ± 0,43 mg g-1 no chá preto e 32,0 ± 0,12 mg g-1 no chá verde. O chá verde e o chá pr...

  12. Chemometric characterization of alembic and industrial sugar cane spirits from cape verde and ceará, Brazil.

    Science.gov (United States)

    Pereira, Regina F R; Vidal, Carla B; de Lima, Ari C A; Melo, Diego Q; Dantas, Allan N S; Lopes, Gisele S; do Nascimento, Ronaldo F; Gomes, Clerton L; da Silva, Maria Nataniela

    2012-01-01

    Sugar cane spirits are some of the most popular alcoholic beverages consumed in Cape Verde. The sugar cane spirit industry in Cape Verde is based mainly on archaic practices that operate without supervision and without efficient control of the production process. The objective of this work was to evaluate samples of industrial and alembic sugar cane spirits from Cape Verde and Ceará, Brazil using principal component analysis. Thirty-two samples of spirits were analyzed, twenty from regions of the islands of Cape Verde and twelve from Ceará, Brazil. Of the samples obtained from Ceará, Brazil seven are alembic and five are industrial spirits. The components analyzed in these studies included the following: volatile organic compounds (n-propanol, isobutanol, isoamylic, higher alcohols, alcoholic grade, acetaldehyde, acetic acid, acetate); copper; and sulfates.

  13. Impact of Diagenesis on Biosignature Preservation Potential in Playa Lake Evaporites of the Verde Formation, Arizona: Implications for Mars Exploration

    Science.gov (United States)

    Shkolyar, S.; Farmer, J. D.

    2016-05-01

    We studied evaporite subfacies in the Verde Fmn., AZ. We identified diagenetic pathways and assessed how diagenesis affected biosignature preservation potential (BPP) in each. Results revealed eight pathways, each with diverse impacts on BPP.

  14. Chemometric Characterization of Alembic and Industrial Sugar Cane Spirits from Cape Verde and Ceará, Brazil

    Directory of Open Access Journals (Sweden)

    Regina F. R. Pereira

    2012-01-01

    Full Text Available Sugar cane spirits are some of the most popular alcoholic beverages consumed in Cape Verde. The sugar cane spirit industry in Cape Verde is based mainly on archaic practices that operate without supervision and without efficient control of the production process. The objective of this work was to evaluate samples of industrial and alembic sugar cane spirits from Cape Verde and Ceará, Brazil using principal component analysis. Thirty-two samples of spirits were analyzed, twenty from regions of the islands of Cape Verde and twelve from Ceará, Brazil. Of the samples obtained from Ceará, Brazil seven are alembic and five are industrial spirits. The components analyzed in these studies included the following: volatile organic compounds (n-propanol, isobutanol, isoamylic, higher alcohols, alcoholic grade, acetaldehyde, acetic acid, acetate; copper; and sulfates.

  15. O sistema de animação Web da Rota dos Vinhos Verdes(Norte de Portugal

    Directory of Open Access Journals (Sweden)

    José Luís Reis

    2016-01-01

    Full Text Available The Web animation system of the Vinhos Verdes Route, assists, through a Web based technology platform, individuals to organize visits to places of tourist interest in the Vinhos Verdes Region. The animation system managed the content associated with the route members, the locations that contain services/ activities, the routes, the news and events that constitute a repository of all relevant information inherent to the heritage associated with wine tourism in the Vinhos Verdes Region. The animation system, which includes a Database Management System, interacts with a map‑based Framework of the Google Maps system, and is integrated in the Vinhos Verdes Region Web portal, establishing itself as one of the technical tools used by marketing, particularly to disseminate content, to understand the visitor’s origin and how they navigate in the Web animation system.

  16. Vegetation classification and distribution mapping report Mesa Verde National Park

    Science.gov (United States)

    Thomas, Kathryn A.; McTeague, Monica L.; Ogden, Lindsay; Floyd, M. Lisa; Schulz, Keith; Friesen, Beverly A.; Fancher, Tammy; Waltermire, Robert G.; Cully, Anne

    2009-01-01

    The classification and distribution mapping of the vegetation of Mesa Verde National Park (MEVE) and surrounding environment was achieved through a multi-agency effort between 2004 and 2007. The National Park Service’s Southern Colorado Plateau Network facilitated the team that conducted the work, which comprised the U.S. Geological Survey’s Southwest Biological Science Center, Fort Collins Research Center, and Rocky Mountain Geographic Science Center; Northern Arizona University; Prescott College; and NatureServe. The project team described 47 plant communities for MEVE, 34 of which were described from quantitative classification based on f eld-relevé data collected in 1993 and 2004. The team derived 13 additional plant communities from field observations during the photointerpretation phase of the project. The National Vegetation Classification Standard served as a framework for classifying these plant communities to the alliance and association level. Eleven of the 47 plant communities were classified as “park specials;” that is, plant communities with insufficient data to describe them as new alliances or associations. The project team also developed a spatial vegetation map database representing MEVE, with three different map-class schemas: base, group, and management map classes. The base map classes represent the fi nest level of spatial detail. Initial polygons were developed using Definiens Professional (at the time of our use, this software was called eCognition), assisted by interpretation of 1:12,000 true-color digital orthophoto quarter quadrangles (DOQQs). These polygons (base map classes) were labeled using manual photo interpretation of the DOQQs and 1:12,000 true-color aerial photography. Field visits verified interpretation concepts. The vegetation map database includes 46 base map classes, which consist of associations, alliances, and park specials classified with quantitative analysis, additional associations and park specials noted

  17. Transactions of the Second Annual Congress of the Sociedad Nuclear Mexicana A.C.; Memorias del Segundo Congreso Anual de la Sociedad Nuclear Mexicana A.C.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-11-01

    With no doubt, 1991 has been a good year for Nuclear Energy in Mexico. The record imposed by Laguna Verde Nuclear Power Plant, the first in his type in the world, operating without interruption in its first operating cycle, represents a splendid incentive for we all the nuclear workers. This fact is reflected in the percentage of papers presented in this congress, dealing with several aspects of Laguna Verde Central. This achievement should serve as an impulse for the development of other areas of application of nuclear energy in the country and at the same time be a reflection of the participation of the members of our society with good quality papers. In this Second Congress of Sociedad Nuclear Mexicana A.C., around thirty papers were presented in the technical sessions, in areas as: fuel management, radiation protection, reactor physics, transients analysis, nuclear materials and others. A special section is dedicated to present the experiences of the first fuel reload of Unit 1 in Laguna Verde Nuclear Power Plant,as well as different plenary meetings dedicated to subjects of general interest as advanced reactors, waste disposal and others. It is the wish of all the members of Sociedad Nuclear Mexicana A.C., that this annual meetings will be enriched with the enthusiastic participation of the scholars of nuclear field and that they represent the forum that we all need for the exchange of knowledge and experiences. (Author).

  18. Four stops of fuel reloading with duration of less of 30 days in the Laguna Verde Central; Cuatro paradas de recarga de combustible con duracion de menos de 30 dias en la central laguna verde

    Energy Technology Data Exchange (ETDEWEB)

    Lozano L, A. [CFE, Central Laguna Verde, Planeacion, Veracruz (Mexico)]. e-mail: agustin.lozano@cfe.gob.mx

    2008-07-01

    The Laguna Verde Central having established as mission 'With maximum priority in the safety, to generate electricity by nuclear means with competitive quality and cost, sustained in our personnel's continuous overcoming and deep respect to the environment' and respecting our values (safety, responsibility by results, professional integrity, continuous improvement, team work, excellence in the performance, quality of service, protection to the environment its thought about our strategic objectives of the power station being born by this way one of them that it is the improvement program 'reduction of reloading times' looking for to be improves every day comparing us with the best plants of the world effectiveness all the processes in the power station that allowed us to measure our performance with the same parameters that settle down at international level as its are nuclear safety, industrial safety, radiological safety, capacity factor, readiness factor, cleaning of the power station attachment to procedures, attention to the detail and certainly to be competitive in the economic aspect. After analyzing the performance record of the power station, evaluating our technical, economic capacity, the location of the installation besides revising the international experiences was defined that one of the concepts that impact considerably so much to the capacity factors and readiness besides the dose and production cost is the duration of the reloading periods, for this reason work strategies were elaborated to be able to reach our goals of reloading days in less than 30 days, here are formed the carried out actions that they made us complete the four last reloading in less than 30 days. (Author)

  19. Three stops of fuel reloading with length of less 30 days in the Laguna Verde Central; Tres paradas de recarga de combustible con duracion de menos de 30 dias en la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Lozano L, A. [Comision Federal de Electricidad, Central Laguna Verde, Subgerencia General de Operacion Planeacion, Veracruz (Mexico)]. e-mail: agustin.lozano@cfe.gob.mx

    2007-07-01

    The Laguna Verde Central having established as mission 'With maximum priority in the safety, to generate electricity by nuclear means with quality and cost competitive, sustained in our personnel's continuous overcoming and deep respect to the environment' and respecting our values (safety, responsibility by results, professional integrity, continuous improving, team working, excellence in the acting, quality of service, protection to the environment) they thought about our strategic objectives of the power station being born this way one of them that it is the program of improvement 'Reduction of reload times' looking for to be improves every day comparing us with the best plants in the world efficient all the processes in the power station that allowed us to measure our acting with the same parameters that settle down at international level like they are nuclear safety, industrial safety, radiological safety, capacity factor, readiness factor, cleaning of the power station attachment to procedures, attention to the detail and certainly to be competitive in the economic aspect. After analyzing the acting record of the power station, evaluating our technical capacity, economic, the location of the installation besides revising the international experiences it was defined that one of the concepts that impact considerably so much to the capacity and readiness factors besides the dose and production cost is the duration of the reload periods, for this reason they were elaborated work strategies to be able to reach our goal of reload days considered in being able to carry out them in less than 30 days, here the actions carried out that they made us complete the three last reloads in less than 30 days are captured. (Author)

  20. Plan verde: un instrumento para la gestión y fomento de áreas verdes en el gran Santiago

    Directory of Open Access Journals (Sweden)

    Claudio Nilo Orellana

    2003-09-01

    Full Text Available La ciudad de Santiago, cuenta con una importante falencia de espacios verdes. La Organización Mundial de la Salud (OMS recomienda que las ciudades tengan 9 metros cuadrados por habitante. Por su parte, el Plan de Prevención y Descontaminación para la Región Metropolitana (PPDA se ha propuesto como meta lograr que el área Metropolitana logre un promedio de 6 metros cuadrados por habitante.