WorldWideScience

Sample records for operating cost estimate

  1. A Cost Simulation Tool for Estimating the Cost of Operating Government Owned and Operated Ships

    Science.gov (United States)

    1994-09-01

    Horngren , C.T., Foster, G., Datar, S.M., Cost Accounting : A Management Emphasis, Prentice-Hall, Englewood Cliffs, NJ, 1994 IBM Corporation, A Graphical...4. TITLE AND SUBTITLE A COST SIMULATION TOOL FOR 5. FUNDING NUMBERS ESTIMATING THE COST OF OPERATING GOVERNMENT OWNED AND OPERATED SHIPS 6. AUTHOR( S ...normally does not present a problem to the accounting department. The final category, the cost of operating the government owned and operated ships is

  2. Radium removal processes capital and operating cost estimates

    International Nuclear Information System (INIS)

    Kelly, F.J.

    1979-09-01

    An estimate of the fixed capital and operating costs for two alternative processes for the removal of dissolved Ra-226 from uranium mill effluent in Elliot Lake, Ontario is presented. Process 1 consists of barium-radium coprecipitation followed by coagulation, flocculation and sedimentation. Process 2 consists of barium-radium coprecipitation followed by gravity media filtration, sand filter backwashing and sedimentation. Cost estimates were prepared for 18 different plant configurations designed to treat 1000 and 4000 imperial gallons per minute (ig/m) of effluent, 24 hrs per day, 7 days per week and 365 days per year with several equipment options. The estimated fixed capital costs for plants equipped with gravity filters were less than those equipped with circular clarifiers. The capital costs ranged from $552,000 with a flow rate of 1000 ig/m to $2,578,000 with a flow rate of 4000 ig/m. Estimated annual operating costs, based on a plant life of 10 years, ranged from $298,000 with a flow rate of 1000 ig/m to $1,061,000 with a flow rate of 4000 ig/m

  3. 16 CFR 305.5 - Determinations of estimated annual energy consumption, estimated annual operating cost, and...

    Science.gov (United States)

    2010-01-01

    ... consumption, estimated annual operating cost, and energy efficiency rating, and of water use rate. 305.5... RULE CONCERNING DISCLOSURES REGARDING ENERGY CONSUMPTION AND WATER USE OF CERTAIN HOME APPLIANCES AND... § 305.5 Determinations of estimated annual energy consumption, estimated annual operating cost, and...

  4. Cost estimates for Operation Desert Shield/Desert Storm: a budgetary analysis

    OpenAIRE

    Johnson, J. Andrew.

    1991-01-01

    Operation Desert Shield/Desert Storm (DS/DS) presented unique challenges for estimating the cost of that conflict. This analysis reviews the cost estimates and methodologies developed for that purpose by DoD, CBO and GAO. It considers the budget climate and the role of foreign cash and in-kind contributions. Finally, it reviews the budgeting innovations used to provide and monitor DS/DS defense spending. At the outset of the crisis, costs were estimated to determine the defense funding requir...

  5. Capital and operating cost estimates for high temperature superconducting magnetic energy storage

    International Nuclear Information System (INIS)

    Schoenung, S.M.; Meier, W.R.; Fagaly, R.L.; Heiberger, M.; Stephens, R.B.; Leuer, J.A.; Guzman, R.A.

    1992-01-01

    Capital and operating costs have been estimated for mid-scale (2 to 200 Mwh) superconducting magnetic energy storage (SMES) designed to use high temperature superconductors (HTS). Capital costs are dominated by the cost of superconducting materials. Operating costs, primarily for regeneration, are significantly reduced for HTS-SMES in comparison to low temperature, conventional systems. This cost component is small compared to other O and M and capital components, when levelized annual costs are projected. In this paper, the developments required for HTS-SMES feasibility are discussed

  6. Model improves oil field operating cost estimates

    International Nuclear Information System (INIS)

    Glaeser, J.L.

    1996-01-01

    A detailed operating cost model that forecasts operating cost profiles toward the end of a field's life should be constructed for testing depletion strategies and plans for major oil fields. Developing a good understanding of future operating cost trends is important. Incorrectly forecasting the trend can result in bad decision making regarding investments and reservoir operating strategies. Recent projects show that significant operating expense reductions can be made in the latter stages o field depletion without significantly reducing the expected ultimate recoverable reserves. Predicting future operating cost trends is especially important for operators who are currently producing a field and must forecast the economic limit of the property. For reasons presented in this article, it is usually not correct to either assume that operating expense stays fixed in dollar terms throughout the lifetime of a field, nor is it correct to assume that operating costs stay fixed on a dollar per barrel basis

  7. Estimated Costs of Continuing Operations in Iraq and Other Operations of the Global War on Terrorism

    National Research Council Canada - National Science Library

    Holtz-Eakin, Douglas

    2004-01-01

    At the request of Senator Conrad, the Congressional Budget Office (CBO) has estimated the costs of military operations in Iraq and Afghanistan and other operations associated with the global war on terrorism (GWOT...

  8. Procedure for estimating nonfuel operation and maintenance costs for large steam-electric power plants

    International Nuclear Information System (INIS)

    Myers, M.L.; Fuller, L.C.

    1979-01-01

    Revised guidelines are presented for estimating annual nonfuel operation and maintenance costs for large steam-electric power plants, specifically light-water-reactor plants and coal-fired plants. Previous guidelines were published in October 1975 in ERDA 76-37, a Procedure for Estimating Nonfuel Operating and Maintenance Costs for Large Steam-Electric Power Plants. Estimates for coal-fired plants include the option of limestone slurry scrubbing for flue gas desulfurization. A computer program, OMCOST, is also presented which covers all plant options

  9. An innovative multivariate tool for fuel consumption and costs estimation of agricultural operations

    Directory of Open Access Journals (Sweden)

    Mirko Guerrieri

    2016-12-01

    Full Text Available The estimation of operating costs of agricultural and forestry machineries is a key factor in both planning agricultural policies and farm management. Few works have tried to estimate operating costs and the produced models are normally based on deterministic approaches. Conversely, in the statistical model randomness is present and variable states are not described by unique values, but rather by probability distributions. In this study, for the first time, a multivariate statistical model based on Partial Least Squares (PLS was adopted to predict the fuel consumption and costs of six agricultural operations such as: ploughing, harrowing, fertilization, sowing, weed control and shredding. The prediction was conducted on two steps: first of all few initial selected parameters (time per surface-area unit, maximum engine power, purchase price of the tractor and purchase price of the operating machinery were used to estimate the fuel consumption; then the predicted fuel consumption together with the initial parameters were used to estimate the operational costs. Since the obtained models were based on an input dataset very heterogeneous, these resulted to be extremely efficient and so generalizable and robust. In details the results show prediction values in the test with r always ≥ 0.91. Thus, the approach may results extremely useful for both farmers (in terms of economic advantages and at institutional level (representing an innovative and efficient tool for planning future Rural Development Programmes and the Common Agricultural Policy. In light of these advantages the proposed approach may as well be implemented on a web platform and made available to all the stakeholders.

  10. An innovative multivariate tool for fuel consumption and costs estimation of agricultural operations

    Energy Technology Data Exchange (ETDEWEB)

    Guerrieri, M.; Fedrizzi, M.; Antonucci, F.; Pallottino, F.; Sperandio, G.; Pagano, M.; Figorilli, S.; Menesatti, P.; Costa, C.

    2016-07-01

    The estimation of operating costs of agricultural and forestry machineries is a key factor in both planning agricultural policies and farm management. Few works have tried to estimate operating costs and the produced models are normally based on deterministic approaches. Conversely, in the statistical model randomness is present and variable states are not described by unique values, but rather by probability distributions. In this study, for the first time, a multivariate statistical model based on Partial Least Squares (PLS) was adopted to predict the fuel consumption and costs of six agricultural operations such as: ploughing, harrowing, fertilization, sowing, weed control and shredding. The prediction was conducted on two steps: first of all few initial selected parameters (time per surface-area unit, maximum engine power, purchase price of the tractor and purchase price of the operating machinery) were used to estimate the fuel consumption; then the predicted fuel consumption together with the initial parameters were used to estimate the operational costs. Since the obtained models were based on an input dataset very heterogeneous, these resulted to be extremely efficient and so generalizable and robust. In details the results show prediction values in the test with r always ≥ 0.91. Thus, the approach may results extremely useful for both farmers (in terms of economic advantages) and at institutional level (representing an innovative and efficient tool for planning future Rural Development Programmes and the Common Agricultural Policy). In light of these advantages the proposed approach may as well be implemented on a web platform and made available to all the stakeholders.

  11. An innovative multivariate tool for fuel consumption and costs estimation of agricultural operations

    International Nuclear Information System (INIS)

    Guerrieri, M.; Fedrizzi, M.; Antonucci, F.; Pallottino, F.; Sperandio, G.; Pagano, M.; Figorilli, S.; Menesatti, P.; Costa, C.

    2016-01-01

    The estimation of operating costs of agricultural and forestry machineries is a key factor in both planning agricultural policies and farm management. Few works have tried to estimate operating costs and the produced models are normally based on deterministic approaches. Conversely, in the statistical model randomness is present and variable states are not described by unique values, but rather by probability distributions. In this study, for the first time, a multivariate statistical model based on Partial Least Squares (PLS) was adopted to predict the fuel consumption and costs of six agricultural operations such as: ploughing, harrowing, fertilization, sowing, weed control and shredding. The prediction was conducted on two steps: first of all few initial selected parameters (time per surface-area unit, maximum engine power, purchase price of the tractor and purchase price of the operating machinery) were used to estimate the fuel consumption; then the predicted fuel consumption together with the initial parameters were used to estimate the operational costs. Since the obtained models were based on an input dataset very heterogeneous, these resulted to be extremely efficient and so generalizable and robust. In details the results show prediction values in the test with r always ≥ 0.91. Thus, the approach may results extremely useful for both farmers (in terms of economic advantages) and at institutional level (representing an innovative and efficient tool for planning future Rural Development Programmes and the Common Agricultural Policy). In light of these advantages the proposed approach may as well be implemented on a web platform and made available to all the stakeholders.

  12. Laser cost experience and estimation

    International Nuclear Information System (INIS)

    Shofner, F.M.; Hoglund, R.L.

    1977-01-01

    This report addresses the question of estimating the capital and operating costs for LIS (Laser Isotope Separation) lasers, which have performance requirements well beyond the state of mature art. This question is seen with different perspectives by political leaders, ERDA administrators, scientists, and engineers concerned with reducing LIS to economically successful commercial practice, on a timely basis. Accordingly, this report attempts to provide ''ballpark'' estimators for capital and operating costs and useful design and operating information for lasers based on mature technology, and their LIS analogs. It is written very basically and is intended to respond about equally to the perspectives of administrators, scientists, and engineers. Its major contributions are establishing the current, mature, industrialized laser track record (including capital and operating cost estimators, reliability, types of application, etc.) and, especially, evolution of generalized estimating procedures for capital and operating cost estimators for new laser design

  13. A parametric cost model for estimating operating and support costs of US Navy (non-nuclear) surface ships

    OpenAIRE

    Brandt, James M.

    1999-01-01

    Approved for public release; distribution is unlimited With few effective decision-making tools to assess the affordability of major weapon systems, management of total ownership costs is continually misunderstood. Cost analysis provides a quick and reliable assessment of affordability. Because there is no standardized method for calculating reliable estimates of operating and support (O&S) costs (the principal component of total ownership cost), this thesis formulates a parametric cost mo...

  14. Estimation of the laser cutting operating cost by support vector regression methodology

    Science.gov (United States)

    Jović, Srđan; Radović, Aleksandar; Šarkoćević, Živče; Petković, Dalibor; Alizamir, Meysam

    2016-09-01

    Laser cutting is a popular manufacturing process utilized to cut various types of materials economically. The operating cost is affected by laser power, cutting speed, assist gas pressure, nozzle diameter and focus point position as well as the workpiece material. In this article, the process factors investigated were: laser power, cutting speed, air pressure and focal point position. The aim of this work is to relate the operating cost to the process parameters mentioned above. CO2 laser cutting of stainless steel of medical grade AISI316L has been investigated. The main goal was to analyze the operating cost through the laser power, cutting speed, air pressure, focal point position and material thickness. Since the laser operating cost is a complex, non-linear task, soft computing optimization algorithms can be used. Intelligent soft computing scheme support vector regression (SVR) was implemented. The performance of the proposed estimator was confirmed with the simulation results. The SVR results are then compared with artificial neural network and genetic programing. According to the results, a greater improvement in estimation accuracy can be achieved through the SVR compared to other soft computing methodologies. The new optimization methods benefit from the soft computing capabilities of global optimization and multiobjective optimization rather than choosing a starting point by trial and error and combining multiple criteria into a single criterion.

  15. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  16. Estimating truck operating costs for domestic trips – case studies from Greece

    Directory of Open Access Journals (Sweden)

    Sdoukopoulos Eleftherios

    2015-11-01

    Full Text Available The transport sector represents a vital component of national economies and has significant impacts on productivity and social welfare. In 2012, the transport sector in Europe was estimated to account for 3.7% of the European Gross Domestic Product (GDP and 5.1% for employment. Road transport proves to be the predominant mode for moving goods within Europe holding a share of approximately 45.8% in 2012 (in ton-kms. In Greece, the share of road freight transport is significantly higher (98% indicating the importance of this sector for the Greek economy. To this end and considering the existing needs of road freight transport operators in Greece, the objective of this research is to establish an analytical and documented basis for estimating the operating cost of a truck on specific urban or national freight transport routes. To achieve this goal, an extended literature review has been conducted resulting in the identification of the main components comprising the total truck operating cost, which were then updated and validated through a series of personal interviews with selected road freight transport professionals. An excel-based application tool was also developed in order to facilitate operating cost estimates for different cases, through selection of the proper values of the relevant parameters. The resulting tool was used to analyse four test cases, which demonstrate the tool’s usability and applicability. Results from this analysis have been also validated by industry experts and they reflect real-world transport scenarios.

  17. Statistical methods of estimating mining costs

    Science.gov (United States)

    Long, K.R.

    2011-01-01

    Until it was defunded in 1995, the U.S. Bureau of Mines maintained a Cost Estimating System (CES) for prefeasibility-type economic evaluations of mineral deposits and estimating costs at producing and non-producing mines. This system had a significant role in mineral resource assessments to estimate costs of developing and operating known mineral deposits and predicted undiscovered deposits. For legal reasons, the U.S. Geological Survey cannot update and maintain CES. Instead, statistical tools are under development to estimate mining costs from basic properties of mineral deposits such as tonnage, grade, mineralogy, depth, strip ratio, distance from infrastructure, rock strength, and work index. The first step was to reestimate "Taylor's Rule" which relates operating rate to available ore tonnage. The second step was to estimate statistical models of capital and operating costs for open pit porphyry copper mines with flotation concentrators. For a sample of 27 proposed porphyry copper projects, capital costs can be estimated from three variables: mineral processing rate, strip ratio, and distance from nearest railroad before mine construction began. Of all the variables tested, operating costs were found to be significantly correlated only with strip ratio.

  18. Space Station Freedom operations costs

    Science.gov (United States)

    Accola, Anne L.; Williams, Gregory J.

    1988-01-01

    Measures to reduce the operation costs of the Space Station which can be implemented in the design and development stages are discussed. Operational functions are described in the context of an overall operations concept. The provisions for operations cost responsibilities among the partners in the Space Station program are presented. Cost estimating methodologies and the way in which operations costs affect the design and development process are examined.

  19. The Effect of Infrastructure Sharing in Estimating Operations Cost of Future Space Transportation Systems

    Science.gov (United States)

    Sundaram, Meenakshi

    2005-01-01

    NASA and the aerospace industry are extremely serious about reducing the cost and improving the performance of launch vehicles both manned or unmanned. In the aerospace industry, sharing infrastructure for manufacturing more than one type spacecraft is becoming a trend to achieve economy of scale. An example is the Boeing Decatur facility where both Delta II and Delta IV launch vehicles are made. The author is not sure how Boeing estimates the costs of each spacecraft made in the same facility. Regardless of how a contractor estimates the cost, NASA in its popular cost estimating tool, NASA Air force Cost Modeling (NAFCOM) has to have a method built in to account for the effect of infrastructure sharing. Since there is no provision in the most recent version of NAFCOM2002 to take care of this, it has been found by the Engineering Cost Community at MSFC that the tool overestimates the manufacturing cost by as much as 30%. Therefore, the objective of this study is to develop a methodology to assess the impact of infrastructure sharing so that better operations cost estimates may be made.

  20. Trajectory-Based Operations (TBO) Cost Estimation, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The Innovation Laboratory, Inc., proposes to build a tool to estimate airline costs under TBO. This tool includes a cost model that explicitly reasons about traffic...

  1. The Launch Systems Operations Cost Model

    Science.gov (United States)

    Prince, Frank A.; Hamaker, Joseph W. (Technical Monitor)

    2001-01-01

    One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to

  2. Approaches to estimating decommissioning costs

    International Nuclear Information System (INIS)

    Smith, R.I.

    1990-07-01

    The chronological development of methodology for estimating the cost of nuclear reactor power station decommissioning is traced from the mid-1970s through 1990. Three techniques for developing decommissioning cost estimates are described. The two viable techniques are compared by examining estimates developed for the same nuclear power station using both methods. The comparison shows that the differences between the estimates are due largely to differing assumptions regarding the size of the utility and operating contractor overhead staffs. It is concluded that the two methods provide bounding estimates on a range of manageable costs, and provide reasonable bases for the utility rate adjustments necessary to pay for future decommissioning costs. 6 refs

  3. TOPEX: An expert system for estimating and analyzing the operating costs of oil and gas production facilities

    International Nuclear Information System (INIS)

    Greffioz, J.; Olver, A.J.; Schirmer, P.

    1993-01-01

    TOPEX is a new approach to operating costs estimation of oil and gas installations. It does not rely on knowledge of the capital cost of the installation and uses a computerized expert system (or knowledge base). Estimates are generated from specific details of the equipment and systems and general databases of prices and man hours. A novel methodology has been developed for quantifying the operational complexity of an installation which is then correlated with operations manpower. The use of a computerized application allows rapid calculation of estimates so that what-if and sensitivity studies can be readily done. The knowledge base provides a powerful tool to handle the large amounts of data involved and acts as a repository for the expertise used in its development

  4. Marginal costs for road maintenance and operation - a cost function approach

    OpenAIRE

    Haraldsson, Mattias

    2007-01-01

    Using observational data covering the whole Swedish national road network for the period 1998-2002, this paper estimates a set of maintenance and operation cost functions. It is found that costs for all operation and maintenance measures increase with traffic intensity, with two exceptions; total operation and winter operation measures are fixed cost activities. All other operation and maintenance measures have short run elasticities in the range 0.25-0.60. The impact of an additional vehicle...

  5. Modeling Operations Costs for Human Exploration Architectures

    Science.gov (United States)

    Shishko, Robert

    2013-01-01

    Operations and support (O&S) costs for human spaceflight have not received the same attention in the cost estimating community as have development costs. This is unfortunate as O&S costs typically comprise a majority of life-cycle costs (LCC) in such programs as the International Space Station (ISS) and the now-cancelled Constellation Program. Recognizing this, the Constellation Program and NASA HQs supported the development of an O&S cost model specifically for human spaceflight. This model, known as the Exploration Architectures Operations Cost Model (ExAOCM), provided the operations cost estimates for a variety of alternative human missions to the moon, Mars, and Near-Earth Objects (NEOs) in architectural studies. ExAOCM is philosophically based on the DoD Architecture Framework (DoDAF) concepts of operational nodes, systems, operational functions, and milestones. This paper presents some of the historical background surrounding the development of the model, and discusses the underlying structure, its unusual user interface, and lastly, previous examples of its use in the aforementioned architectural studies.

  6. Cost estimating for large nuclear projects

    International Nuclear Information System (INIS)

    Duggal, A.; Hunt, M.

    2004-01-01

    In today's market, the generation of electricity is a very competitive business, which is constantly under the watchful eye of the media and public. Nuclear power faces a lot of competition from other sources such as hydro, coal and gas. Controlling costs, monitoring costs, feedback, industry knowledge and up to date cost estimating tools are essential for a nuclear company to compete on a long term basis. This paper reviews the terminology and estimating principles used for the construction of new nuclear plants, lifetime operating costs, and the costs associated with refurbishment work. (author)

  7. AX Tank Farm waste retrieval alternatives cost estimates

    International Nuclear Information System (INIS)

    Krieg, S.A.

    1998-01-01

    This report presents the estimated costs associated with retrieval of the wastes from the four tanks in AX Tank Farm. The engineering cost estimates developed for this report are based on previous cost data prepared for Project W-320 and the HTI 241-C-106 Heel Retrieval System. The costs presented in this report address only the retrieval of the wastes from the four AX Farm tanks. This includes costs for equipment procurement, fabrication, installation, and operation to retrieve the wastes. The costs to modify the existing plant equipment and systems to support the retrieval equipment are also included. The estimates do not include operational costs associated with pumping the waste out of the waste receiver tank (241-AY-102) between AX Farm retrieval campaigns or transportation, processing, and disposal of the retrieved waste

  8. Food irradiation : estimates of cost of processing

    International Nuclear Information System (INIS)

    Krishnamurthy, K.; Bongirwar, D.R.

    1987-01-01

    For estimating the cost of food irradiation, three factors have to be taken into consideration. These are : (1) capital cost incurred on irradiation device and its installation, (2) recurring or running cost which includes maintenance cost and operational expenditure, and (3) product specific cost dependent on the factors specific to the food item to be processed, its storage, handling and distribution. A simple method is proposed to provide estimates of capital costs and running costs and it is applied to prepare a detailed estimate of costs for irradiation processing of onions and fish in India. The cost of processing onions worked out to be between Rs. 40 to 120 per 1000 Kg and for fish Rs 354 per 1000 Kg. These estimates do not take into account transparation costs and fluctuations in marketing procedures. (M.G.B.). 7 tables

  9. Planning and Estimation of Operations Support Requirements

    Science.gov (United States)

    Newhouse, Marilyn E.; Barley, Bryan; Bacskay, Allen; Clardy, Dennon

    2010-01-01

    Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D

  10. Unmanned Aerial Vehicles unique cost estimating requirements

    Science.gov (United States)

    Malone, P.; Apgar, H.; Stukes, S.; Sterk, S.

    Unmanned Aerial Vehicles (UAVs), also referred to as drones, are aerial platforms that fly without a human pilot onboard. UAVs are controlled autonomously by a computer in the vehicle or under the remote control of a pilot stationed at a fixed ground location. There are a wide variety of drone shapes, sizes, configurations, complexities, and characteristics. Use of these devices by the Department of Defense (DoD), NASA, civil and commercial organizations continues to grow. UAVs are commonly used for intelligence, surveillance, reconnaissance (ISR). They are also use for combat operations, and civil applications, such as firefighting, non-military security work, surveillance of infrastructure (e.g. pipelines, power lines and country borders). UAVs are often preferred for missions that require sustained persistence (over 4 hours in duration), or are “ too dangerous, dull or dirty” for manned aircraft. Moreover, they can offer significant acquisition and operations cost savings over traditional manned aircraft. Because of these unique characteristics and missions, UAV estimates require some unique estimating methods. This paper describes a framework for estimating UAV systems total ownership cost including hardware components, software design, and operations. The challenge of collecting data, testing the sensitivities of cost drivers, and creating cost estimating relationships (CERs) for each key work breakdown structure (WBS) element is discussed. The autonomous operation of UAVs is especially challenging from a software perspective.

  11. Estimating the Costs of Military Operations in Iraq

    National Research Council Canada - National Science Library

    Gilmore, J. M

    2007-01-01

    This testimony, given by J. Michael Gilmore, Assistant Director for National Security, before the Committee on the Budget, United States Senate, discusses the costs of operations in the Iraq theater and issues associated...

  12. Stochastic cost estimating in repository life-cycle cost analysis

    International Nuclear Information System (INIS)

    Tzemos, S.; Dippold, D.

    1986-01-01

    The conceptual development, the design, and the final construction and operation of a nuclear repository span many decades. Given this lengthy time frame, it is quite challenging to obtain a good approximation of the repository life-cycle cost. One can deal with this challenge by using an analytic method, the method of moments, to explicitly assess the uncertainty of the estimate. A series expansion is used to approximate the uncertainty distribution of the cost estimate. In this paper, the moment methodology is derived and is illustrated through a numerical example. The range of validity of the approximation is discussed. The method of moments is compared to the traditional stochastic cost estimating methods and found to provide more and better information on cost uncertainty. The tow methods converge to identical results as the number of convolved variables increases and approaches the range where the central limit theorem is valid

  13. Cost estimating for CERCLA remedial alternatives a unit cost methodology

    International Nuclear Information System (INIS)

    Brettin, R.W.; Carr, D.J.; Janke, R.J.

    1995-06-01

    The United States Environmental Protection Agency (EPA) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA, Interim Final, dated October 1988 (EPA 1988) requires a detailed analysis be conducted of the most promising remedial alternatives against several evaluation criteria, including cost. To complete the detailed analysis, order-of-magnitude cost estimates (having an accuracy of +50 percent to -30 percent) must be developed for each remedial alternative. This paper presents a methodology for developing cost estimates of remedial alternatives comprised of various technology and process options with a wide range of estimated contaminated media quantities. In addition, the cost estimating methodology provides flexibility for incorporating revisions to remedial alternatives and achieves the desired range of accuracy. It is important to note that the cost estimating methodology presented here was developed as a concurrent path to the development of contaminated media quantity estimates. This methodology can be initiated before contaminated media quantities are estimated. As a result, this methodology is useful in developing cost estimates for use in screening and evaluating remedial technologies and process options. However, remedial alternative cost estimates cannot be prepared without the contaminated media quantity estimates. In the conduct of the feasibility study for Operable Unit 5 at the Fernald Environmental Management Project (FEMP), fourteen remedial alternatives were retained for detailed analysis. Each remedial alternative was composed of combinations of remedial technologies and processes which were earlier determined to be best suited for addressing the media-specific contaminants found at the FEMP site, and achieving desired remedial action objectives

  14. Unit costs of waste management operations

    International Nuclear Information System (INIS)

    Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

    1994-04-01

    This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ''cradle to grave'') cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics

  15. OpCost: an open-source system for estimating costs of stand-level forest operations

    Science.gov (United States)

    Conor K. Bell; Robert F. Keefe; Jeremy S. Fried

    2017-01-01

    This report describes and documents the OpCost forest operations cost model, a key component of the BioSum analysis framework. OpCost is available in two editions: as a callable module for use with BioSum, and in a stand-alone edition that can be run directly from R. OpCost model logic and assumptions for this open-source tool are explained, references to the...

  16. Handbook for quick cost estimates. A method for developing quick approximate estimates of costs for generic actions for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Ball, J.R.

    1986-04-01

    This document is a supplement to a ''Handbook for Cost Estimating'' (NUREG/CR-3971) and provides specific guidance for developing ''quick'' approximate estimates of the cost of implementing generic regulatory requirements for nuclear power plants. A method is presented for relating the known construction costs for new nuclear power plants (as contained in the Energy Economic Data Base) to the cost of performing similar work, on a back-fit basis, at existing plants. Cost factors are presented to account for variations in such important cost areas as construction labor productivity, engineering and quality assurance, replacement energy, reworking of existing features, and regional variations in the cost of materials and labor. Other cost categories addressed in this handbook include those for changes in plant operating personnel and plant documents, licensee costs, NRC costs, and costs for other government agencies. Data sheets, worksheets, and appropriate cost algorithms are included to guide the user through preparation of rough estimates. A sample estimate is prepared using the method and the estimating tools provided.

  17. Handbook for quick cost estimates. A method for developing quick approximate estimates of costs for generic actions for nuclear power plants

    International Nuclear Information System (INIS)

    Ball, J.R.

    1986-04-01

    This document is a supplement to a ''Handbook for Cost Estimating'' (NUREG/CR-3971) and provides specific guidance for developing ''quick'' approximate estimates of the cost of implementing generic regulatory requirements for nuclear power plants. A method is presented for relating the known construction costs for new nuclear power plants (as contained in the Energy Economic Data Base) to the cost of performing similar work, on a back-fit basis, at existing plants. Cost factors are presented to account for variations in such important cost areas as construction labor productivity, engineering and quality assurance, replacement energy, reworking of existing features, and regional variations in the cost of materials and labor. Other cost categories addressed in this handbook include those for changes in plant operating personnel and plant documents, licensee costs, NRC costs, and costs for other government agencies. Data sheets, worksheets, and appropriate cost algorithms are included to guide the user through preparation of rough estimates. A sample estimate is prepared using the method and the estimating tools provided

  18. Preliminary ITER cost and schedule estimates

    International Nuclear Information System (INIS)

    1990-01-01

    The cost, manpower requirements, and schedule estimates for the realization of the ITER tokamak have been studied during the Conceptual Design Activities, as a result of work by the ITER Management Committee. This work was completed during the January-March, 1990 joint work session, and is presented in this report. A possible schedule shows completion of the engineering design phase in 1995, with 180 professionals, at a cost of about $250M. The construction would be completed in 2004 with a rise in professional staff to 300, and a total cost of $4900M. The machine would be operable over an 18-year period, at an annual operating cost averaging $290M. 2 figs

  19. 40 CFR 261.142 - Cost estimate.

    Science.gov (United States)

    2010-07-01

    ... hazardous waste, and the potential cost of closing the facility as a treatment, storage, and disposal... facility. (3) The cost estimate may not incorporate any salvage value that may be realized with the sale of... no later than 30 days after a change in a facility's operating plan or design that would increase the...

  20. Los Alamos Waste Management Cost Estimation Model

    International Nuclear Information System (INIS)

    Matysiak, L.M.; Burns, M.L.

    1994-03-01

    This final report completes the Los Alamos Waste Management Cost Estimation Project, and includes the documentation of the waste management processes at Los Alamos National Laboratory (LANL) for hazardous, mixed, low-level radioactive solid and transuranic waste, development of the cost estimation model and a user reference manual. The ultimate goal of this effort was to develop an estimate of the life cycle costs for the aforementioned waste types. The Cost Estimation Model is a tool that can be used to calculate the costs of waste management at LANL for the aforementioned waste types, under several different scenarios. Each waste category at LANL is managed in a separate fashion, according to Department of Energy requirements and state and federal regulations. The cost of the waste management process for each waste category has not previously been well documented. In particular, the costs associated with the handling, treatment and storage of the waste have not been well understood. It is anticipated that greater knowledge of these costs will encourage waste generators at the Laboratory to apply waste minimization techniques to current operations. Expected benefits of waste minimization are a reduction in waste volume, decrease in liability and lower waste management costs

  1. Lessons Learned for Planning and Estimating Operations Support Requirements

    Science.gov (United States)

    Newhouse, Marilyn

    2011-01-01

    Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

  2. Cost estimating relationships for nuclear power plant operationa and maintenance

    International Nuclear Information System (INIS)

    Bowers, H.I.; Fuller, L.C.; Myers, M.L.

    1987-11-01

    Revised cost estimating relationships for 1987 are presented for estimating annual nonfuel operation and maintenance (O and M) costs for light-water reactor (LWR) nuclear power plants, which update guidelines published previously in 1982. The purpose of these cost estimating relationships is for use in long range planning and evaluations of the economics of nuclear energy for electric power generation. A listing of a computer program, LWROM, implementing the cost estimating relationships and written in advanced BASIC for IBM personal computers, is included

  3. [Fuel Rod Consolidation Project]: The estimated total life cycle cost for the 30-year operation of prototypical consolidation demonstration equipment: Volume 4, Phase 2

    International Nuclear Information System (INIS)

    1987-01-01

    The Total Life Cycle Costs have been developed for the construction, operation and decommissioning of a single line of hot-cell-enclosed production consolidation equipment operating on spent fuel at the rate of 750 MTU/year for 30 years. The cost estimate is for a single production line that is part of an overall facility at either a Monitored Retrievable Storage or a Repository facility. This overall facility would include other capabilities and possibly other consolidation lines. However, no costs were included in the cost estimate for other portions of the plant, except that staff costs include an overhead charge that reflects the overhead support services in an overall facility

  4. Estimation of costs for fabrication of pressurized-water reactor fuel

    International Nuclear Information System (INIS)

    Judkins, R.R.; Olsen, A.R.

    1979-01-01

    To provide a reference case on which to base cost estimates of the several fuel cycles to be considered, the facility, equipment, and operating requirements for the fabrication of fuel for current-design pressurized-water reactors were examined. From an analysis of these requirements, the capital and operating costs of a plant with a capacity of two metric tons of heavy metal per day (MTHM/day) were estimated. In a cash flow analysis, the lifetime of the plant was assumed to be 20 y, and the income from the sale of nuclear fuel assemblies over this period was equated to the total capital and operating expenses of the plant, including a specified 15% return on investment. In this way a levelized unit price for the fuel was obtained. The effects of inflation were not considered since the purpose of these estimates and the determination of unit price was to permit comparison of different types of fuels. The capital costs of the fuel fabrication plant were estimated at $32 million for the facility--land, site preparation, building--and $34 million for equipment. Annual operating costs including labor, management, materials, and utilities were estimated to be $36.5 million. From these estimates, the unit price for fabricating the fuel for the reference pressurized-water reactor was determined to be $138/kg of heavy metal or $63,600 per fuel assembly

  5. Cost estimation tools in Germany and the UK. Comparison of cost estimates and actual costs

    International Nuclear Information System (INIS)

    Pfeifer, W.; Gordelier, S.; Drake, V.

    2005-01-01

    Full text: Accurate cost estimation for future decommissioning projects is a matter of considerable importance, especially for ensuring that sufficient funds will be available at the time of project implementation. This paper looks at the experience of cost estimation and real implementation outcomes from two countries, Germany and the UK, and draws lessons for the future. In Germany, cost estimates for the decommissioning of power reactors are updated every two years. For this purpose, the STILLKO program of the NIS Company is used. So far, Forschungszentrum Karlsruhe has successfully decommissioned two prototype reactor facilities. Re-cultivation of the premises has already been completed. At the moment, the activated components of the multi-purpose research reactor (MZFR), the first pressurized water reactor in Germany that was moderated and cooled with heavy water, and of the prototype fast breeder reactor (KNK) are being dismantled remotely. Consequently, vast experience exists in particular for the updating of total costs on the basis of actually incurred expenses. The further the dismantling work proceeds, the more reliable is the total cost estimate. Here, the development of the estimated MZFR decommissioning costs shall be presented and compared with the estimates obtained for a German reference PWR-type power reactor of 1200 MW. In this way: - common features of the prototype reactor and power reactor shall be emphasized, - several parameters leading to an increase in the estimated costs shall be highlighted, - cost risks shall be outlined with the remote dismantling of the reactor pressure vessel serving as an example, - calculation parameters shall be presented, and - recommendations shall be made for a consistent estimation of costs. The United Kingdom Atomic Energy Authority (UKAEA) has a major programme for the environmental remediation of its former research and development sites at Dounreay, Windscale, Harwell and Winfrith together with the need to

  6. Process-based Cost Estimation for Ramjet/Scramjet Engines

    Science.gov (United States)

    Singh, Brijendra; Torres, Felix; Nesman, Miles; Reynolds, John

    2003-01-01

    Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

  7. Cost Analysis In A Multi-Mission Operations Environment

    Science.gov (United States)

    Newhouse, M.; Felton, L.; Bornas, N.; Botts, D.; Roth, K.; Ijames, G.; Montgomery, P.

    2014-01-01

    Spacecraft control centers have evolved from dedicated, single-mission or single missiontype support to multi-mission, service-oriented support for operating a variety of mission types. At the same time, available money for projects is shrinking and competition for new missions is increasing. These factors drive the need for an accurate and flexible model to support estimating service costs for new or extended missions; the cost model in turn drives the need for an accurate and efficient approach to service cost analysis. The National Aeronautics and Space Administration (NASA) Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center (MSFC) provides operations services to a variety of customers around the world. HOSC customers range from launch vehicle test flights; to International Space Station (ISS) payloads; to small, short duration missions; and has included long duration flagship missions. The HOSC recently completed a detailed analysis of service costs as part of the development of a complete service cost model. The cost analysis process required the team to address a number of issues. One of the primary issues involves the difficulty of reverse engineering individual mission costs in a highly efficient multimission environment, along with a related issue of the value of detailed metrics or data to the cost model versus the cost of obtaining accurate data. Another concern is the difficulty of balancing costs between missions of different types and size and extrapolating costs to different mission types. The cost analysis also had to address issues relating to providing shared, cloud-like services in a government environment, and then assigning an uncertainty or risk factor to cost estimates that are based on current technology, but will be executed using future technology. Finally the cost analysis needed to consider how to validate the resulting cost models taking into account the non-homogeneous nature of the available cost data and the

  8. Simulation-Based Approach to Operating Costs Analysis of Freight Trucking

    Directory of Open Access Journals (Sweden)

    Ozernova Natalja

    2015-12-01

    Full Text Available The article is devoted to the problem of costs uncertainty in road freight transportation services. The article introduces the statistical approach, based on Monte Carlo simulation on spreadsheets, to the analysis of operating costs. The developed model gives an opportunity to estimate operating freight trucking costs under different configuration of cost factors. Important conclusions can be made after running simulations regarding sensitivity to different factors, optimal decisions and variability of operating costs.

  9. Cost of Capital Estimation for Highway Concessionaires in Chile

    Directory of Open Access Journals (Sweden)

    Cristian Vergara-Novoa

    2018-01-01

    Full Text Available In this paper, we present the cost of capital estimation for highway concessionaires in Chile. We estimated the cost of equity and the cost of debt and determined the capital structure for each one of twenty-four concessionaires that operate highways. We based our estimations on the developments of Sharpe (1964, Modigliani and Miller (1958, and Maquieira (2009, which were also compared with the Brusov et al. (2015 developments. We collected stock prices for different highway concessionaires around the world from Google Finance and Reuters’ websites in order to determine the Beta of equity using a representative company. After that, we estimated the cost of equity considering Hamada (1969 and a Capital Asset Pricing Model. Then, we estimated the cost of capital using the cost of debt and the capital structure of Chile’s highway concessionaires. With all above, we were able to determine the Weighted Average Cost of Capital (WACC for highway concessions which ranges from 5.49 to 6.62%.

  10. Cost Estimation for Research Reactor Decommissioning

    International Nuclear Information System (INIS)

    2013-01-01

    One of the IAEA's statutory objectives is to 'seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world'. One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Article III.A.6 of the IAEA Statute, the safety standards establish 'standards of safety for protection of health and minimization of danger to life and property.' The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on, and application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. The purpose of this publication is to develop a costing methodology and a software tool in order to support cost estimation for research reactor decommissioning. The costing methodology is intended for the preliminary cost estimation stages for research reactor decommissioning with limited inventory data and other input data available. Existing experience in decommissioning costing is considered. As the basis for the cost calculation structure, the costing model uses the International Structure for Decommissioning Costing (ISDC) that is recommended by the IAEA, the Organisation for

  11. Development of regional stump-to-mill logging cost estimators

    Science.gov (United States)

    Chris B. LeDoux; John E. Baumgras

    1989-01-01

    Planning logging operations requires estimating the logging costs for the sale or tract being harvested. Decisions need to be made on equipment selection and its application to terrain. In this paper a methodology is described that has been developed and implemented to solve the problem of accurately estimating logging costs by region. The methodology blends field time...

  12. Failing to Estimate the Costs of Offshoring

    DEFF Research Database (Denmark)

    Møller Larsen, Marcus

    2016-01-01

    This article investigates cost estimation errors in the context of offshoring. It is argued that an imprecise estimation of the costs related to implementing a firm activity in a foreign location has a negative impact on the process performance of that activity. Performance is deterred...... as operations are likely to be disrupted by managerial distraction and resource misallocation. It is also argued that this relationship is mitigated by the extent to which firms use modularity to coordinate the activity but worsened by the extent to which ongoing communication is used. The results, based...

  13. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Penev, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-09-01

    This report compares hydrogen station cost estimates conveyed by expert stakeholders through the Hydrogen Station Cost Calculation (HSCC) to a select number of other cost estimates. These other cost estimates include projections based upon cost models and costs associated with recently funded stations.

  14. Cost estimating issues in the Russian integrated system planning context

    International Nuclear Information System (INIS)

    Allentuck, J.

    1996-01-01

    An important factor in the credibility of an optimal capacity expansion plan is the accuracy of cost estimates given the uncertainty of future economic conditions. This paper examines the problems associated with estimating investment and operating costs in the Russian nuclear power context over the period 1994 to 2010

  15. Nuclear generating station and heavy water plant cost estimates for strategy studies

    International Nuclear Information System (INIS)

    Archinoff, G.H.

    1979-07-01

    Nuclear generating station capital, operating and maintenance costs are basic input data for strategy analyses of alternate nuclear fuel cycles. This report presents estimates of these costs for natural uranium CANDU stations, CANDU stations operating on advanced fuel cycles, and liquid metal fast breeder reactors. Cost estimates for heavy water plants are also presented. The results show that station capital costs for advanced fuel cycles are not expected to be significantly greater than those for natural uranium stations. LMFBR capital costs are expected to be 25-30 percent greater than for CANDU's. (auth)

  16. Cost function estimation

    DEFF Research Database (Denmark)

    Andersen, C K; Andersen, K; Kragh-Sørensen, P

    2000-01-01

    on these criteria, a two-part model was chosen. In this model, the probability of incurring any costs was estimated using a logistic regression, while the level of the costs was estimated in the second part of the model. The choice of model had a substantial impact on the predicted health care costs, e...

  17. Operating cost guidelines for benchmarking DOE thermal treatment systems for low-level mixed waste

    International Nuclear Information System (INIS)

    Salmon, R.; Loghry, S.L.; Hermes, W.H.

    1994-11-01

    This report presents guidelines for estimating operating costs for use in benchmarking US Department of Energy (DOE) low-level mixed waste thermal treatment systems. The guidelines are based on operating cost experience at the DOE Toxic Substances Control Act (TSCA) mixed waste incinerator at the K-25 Site at Oak Ridge. In presenting these guidelines, it should be made clear at the outset that it is not the intention of this report to present operating cost estimates for new technologies, but only guidelines for estimating such costs

  18. Venture Guidance Appraisal cost estimates for groundwater protection Environmental Impact Statement

    International Nuclear Information System (INIS)

    Moyer, R.A.

    1987-01-01

    Cost estimates were prepared for closure options at criteria waste sites and alternatives for new disposal facilities for hazardous wastes, mixed wastes, low level radioactive wastes and slurry from liquid waste treatment facilities. Because these cost estimates will be used in the Groundwater Protection EIS, the goal was to develop ''enveloping'' costs, i.e., the alternative or option chosen for execution at a later date should cost no more than the estimate. This report summarizes scenarios for making detailed cost estimates. Also included are unit costs for disposition of potential excavations, for operational activities, and for groundwater monitoring and site maintenance after closure of the site. The cost numbers presented are intended for study purposes only and not for budgetary activities

  19. Operations and support cost modeling using Markov chains

    Science.gov (United States)

    Unal, Resit

    1989-01-01

    Systems for future missions will be selected with life cycle costs (LCC) as a primary evaluation criterion. This reflects the current realization that only systems which are considered affordable will be built in the future due to the national budget constaints. Such an environment calls for innovative cost modeling techniques which address all of the phases a space system goes through during its life cycle, namely: design and development, fabrication, operations and support; and retirement. A significant portion of the LCC for reusable systems are generated during the operations and support phase (OS). Typically, OS costs can account for 60 to 80 percent of the total LCC. Clearly, OS costs are wholly determined or at least strongly influenced by decisions made during the design and development phases of the project. As a result OS costs need to be considered and estimated early in the conceptual phase. To be effective, an OS cost estimating model needs to account for actual instead of ideal processes by associating cost elements with probabilities. One approach that may be suitable for OS cost modeling is the use of the Markov Chain Process. Markov chains are an important method of probabilistic analysis for operations research analysts but they are rarely used for life cycle cost analysis. This research effort evaluates the use of Markov Chains in LCC analysis by developing OS cost model for a hypothetical reusable space transportation vehicle (HSTV) and suggests further uses of the Markov Chain process as a design-aid tool.

  20. Naval Aircraft Operating and Support Cost-Estimating Model - FY77 Revision

    Science.gov (United States)

    1979-02-01

    cont’d.) SAMPLE DPERflTING AND SUPPDRT COST ESTIMATE CTHQUSAMtiS DP FY77S:> iso AVERAGE AHNUAL TDTflL COST COST PER UE 10 AC TDTflL 939...0 01 1 1 0 0 J 9 ? 9 p 14 0 0J 15 0 0, 9 1 P 1700J 18ij 0 P 1900 P 9p £1 0 0 P £8 00 P 9» £400 P 9J 9P 27001 £8 0 0 P 9p 3 000 £ P 31 01 j P 9 ? 3

  1. Cost estimate of Olkiluoto disposal facility for spent nuclear fuel

    International Nuclear Information System (INIS)

    Kukkola, T.; Saanio, T.

    2005-03-01

    The cost estimate covers the underground rock characterisation facility ONKALO, the investment and the operating costs of the above and underground facilities, the decommissioning of the encapsulation plant and the closure costs of the repository. The above ground facility is a once-investment; a re-investment takes place after 37 years operation. The repository is extended stepwise thus also the investment take place in stages. Annual operating costs are calculated with different operating efficiencies. The total investment costs of the disposal facility are estimated to be 503 M euro (Million Euros), the total operating costs are 1,923 M euro and the decommissioning and the closure costs are 116 M euro totaling 2,542 M euro. The investment costs of the above ground facility are 142 M euro, the operating costs are 1,678 M euro. The repository investment costs are 360 M euro and the operating costs are 245 M euro. The decommissioning costs are 7 M euro and the closure costs are 109 M euro. The costs are calculated by using the price level of December 2003. The cost estimate is based on a plan, where the spent fuel is encapsulated and the disposal canisters are disposed into the bedrock at a depth of about 420 meters in one storey. In the encapsulation process, the fuel assemblies are closed into composite canisters, in which the inner part of the canister is made of nodular cast iron and the outer wall of copper having a thickness of 50 mm. The inner canister is closed gas-tight by a bolted steel lid, and the electron beam welding method is used to close the outer copper lid. The encapsulation plant is independent and located above the deep repository spaces. The disposal canisters are transported to the repository by the lift. The disposal tunnels are constructed and closed in stages according the disposal canisters disposal. The operating time of the Loviisa nuclear power plant units is assumed to be 50 years and the operating time of the Olkiluoto nuclear power

  2. IDC reengineering Phase 2 & 3 US industry standard cost estimate summary

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Huelskamp, Robert M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-01-01

    Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, using a commercial software cost estimation tool calibrated to US industry performance parameters. This is not a cost estimate for Sandia to perform the project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

  3. A level playing field: Obtaining consistent cost estimates for advanced reactor designs

    International Nuclear Information System (INIS)

    Hudson, C.R. II; Rohm, H.H.; Humphreys, J.R. Jr.

    1987-01-01

    Rules and guidelines for developing cost estimates are given which provide a means for presenting cost estimates for advanced concepts on a consistent and equitable basis. For advanced reactor designs, the scope of a cost estimate includes the plant capital cost, the operating and maintenance cost, the fuel cycle cost, and the cost of decommissioning. Each element is subdivided as is necessary to provide a common reporting format for all power plant concepts. The total generation cost is taken to be a suitable choice for a summary figure of merit. To test the application of the rules and guidelines as well as developing reference costs for current technologies, several different sized coal and pressurized water reactor plant cost estimates have been prepared

  4. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R. II.

    1993-05-01

    Several advanced power plant concepts are currently under development. These include the Modular High Temperature Gas Cooled Reactors, the Advanced Liquid Metal Reactor and the Advanced Light Water Reactors. One measure of the attractiveness of a new concept is its cost. Invariably, the cost of a new type of power plant will be compared with other alternative forms of electrical generation. This report provides a common starting point, whereby the cost estimates for the various power plants to be considered are developed with common assumptions and ground rules. Comparisons can then be made on a consistent basis. This is the second update of these cost estimate guidelines. Changes have been made to make the guidelines more current (January 1, 1992) and in response to suggestions made as a result of the use of the previous report. The principal changes are that the reference site has been changed from a generic Northeast (Middletown) site to a more central site (EPRI's East/West Central site) and that reference bulk commodity prices and labor productivity rates have been added. This report is designed to provide a framework for the preparation and reporting of costs. The cost estimates will consist of the overnight construction cost, the total plant capital cost, the operation and maintenance costs, the fuel costs, decommissioning costs and the power production or busbar generation cost

  5. The great environmental restoration cost estimating shootout: A blind test of three DOE cost estimating groups

    International Nuclear Information System (INIS)

    Klemen, Paul

    1992-01-01

    The cost of the Department of Energy's (DOE) Environmental Restoration (ER) Program has increased steadily over the last three years and, in the process, has drawn increasing scrutiny from Congress, the public, and government agencies such as the Office of Management and Budget and the General Accounting Office. Programmatic costs have been reviewed by many groups from within the DOE as well as from outside agencies. While cost may appear to be a universally applicable barometer of project conditions, it is actually a single dimensional manifestation of a complex set of conditions. As such, variations in cost estimates can be caused by a variety of underlying factors such as changes in scope, schedule, performing organization, economic conditions, or regulatory environment. This paper will examine the subject of cost estimates by evaluating three different cost estimates prepared for a single project including two estimates prepared by project proponents and another estimate prepared by a review team. The paper identifies the reasons for cost growth as measured by the different estimates and evaluates the ability of review estimates to measure the validity of costs. The comparative technique used to test the three cost estimates will identify the reasons for changes in the estimated cost, over time, and evaluate the ability of an independent review to correctly identify the reasons for cost growth and evaluate the reasonableness of the cost proposed by the project proponents. Recommendations are made for improved cost estimates and improved cost estimate reviews. Conclusions are reached regarding the differences in estimate results that can be attributed to differences in estimating techniques, the implications of these differences for decision makers, and circumstances that are unique to environmental cost estimating. (author)

  6. Understanding cost growth during operations of planetary missions: An explanation of changes

    Science.gov (United States)

    McNeill, J. F.; Chapman, E. L.; Sklar, M. E.

    In the development of project cost estimates for interplanetary missions, considerable focus is generally given to the development of cost estimates for the development of ground, flight, and launch systems, i.e., Phases B, C, and D. Depending on the project team, efforts expended to develop cost estimates for operations (Phase E) may be relatively less rigorous than that devoted to estimates for ground and flight systems development. Furthermore, the project team may be challenged to develop a solid estimate of operations cost in the early stages of mission development, e.g., Concept Study Report or Systems Requirement Review (CSR/SRR), Preliminary Design Review (PDR), as mission specific peculiarities that impact cost may not be well understood. In addition, a methodology generally used to develop Phase E cost is engineering build-up, also known as “ grass roots” . Phase E can include cost and schedule risks that are not anticipated at the time of the major milestone reviews prior to launch. If not incorporated into the engineering build-up cost method for Phase E, this may translate into an estimation of the complexity of operations and overall cost estimates that are not mature and at worse, insufficient. As a result, projects may find themselves with thin reserves during cruise and on-orbit operations or project overruns prior to the end of mission. This paper examines a set of interplanetary missions in an effort to better understand the reasons for cost and staffing growth in Phase E. The method used in the study is discussed as well as the major findings summarized as the Phase E Explanation of Change (EoC). Research for the study entailed the review of project materials, including Estimates at Completion (EAC) for Phase E and staffing profiles, major project milestone reviews, e.g., CSR, PDR, Critical Design Review (CDR), the interviewing of select project and mission management, and review of Phase E replan materials. From this work, a detai- ed

  7. The Application of Architecture Frameworks to Modelling Exploration Operations Costs

    Science.gov (United States)

    Shishko, Robert

    2006-01-01

    Developments in architectural frameworks and system-of-systems thinking have provided useful constructs for systems engineering. DoDAF concepts, language, and formalisms, in particular, provide a natural way of conceptualizing an operations cost model applicable to NASA's space exploration vision. Not all DoDAF products have meaning or apply to a DoDAF inspired operations cost model, but this paper describes how such DoDAF concepts as nodes, systems, and operational activities relate to the development of a model to estimate exploration operations costs. The paper discusses the specific implementation to the Mission Operations Directorate (MOD) operational functions/activities currently being developed and presents an overview of how this powerful representation can apply to robotic space missions as well.

  8. Site restoration: Estimation of attributable costs from plutonium-dispersal accidents

    International Nuclear Information System (INIS)

    Chanin, D.I.; Murfin, W.B.

    1996-05-01

    A nuclear weapons accident is an extremely unlikely event due to the extensive care taken in operations. However, under some hypothetical accident conditions, plutonium might be dispersed to the environment. This would result in costs being incurred by the government to remediate the site and compensate for losses. This study is a multi-disciplinary evaluation of the potential scope of the post-accident response that includes technical factors, current and proposed legal requirements and constraints, as well as social/political factors that could influence decision making. The study provides parameters that can be used to assess economic costs for accidents postulated to occur in urban areas, Midwest farmland, Western rangeland, and forest. Per-area remediation costs have been estimated, using industry-standard methods, for both expedited and extended remediation. Expedited remediation costs have been evaluated for highways, airports, and urban areas. Extended remediation costs have been evaluated for all land uses except highways and airports. The inclusion of cost estimates in risk assessments, together with the conventional estimation of doses and health effects, allows a fuller understanding of the post-accident environment. The insights obtained can be used to minimize economic risks by evaluation of operational and design alternatives, and through development of improved capabilities for accident response

  9. Site restoration: Estimation of attributable costs from plutonium-dispersal accidents

    Energy Technology Data Exchange (ETDEWEB)

    Chanin, D.I.; Murfin, W.B. [Technadyne Engineering Consultants, Inc., Albuquerque, NM (United States)

    1996-05-01

    A nuclear weapons accident is an extremely unlikely event due to the extensive care taken in operations. However, under some hypothetical accident conditions, plutonium might be dispersed to the environment. This would result in costs being incurred by the government to remediate the site and compensate for losses. This study is a multi-disciplinary evaluation of the potential scope of the post-accident response that includes technical factors, current and proposed legal requirements and constraints, as well as social/political factors that could influence decision making. The study provides parameters that can be used to assess economic costs for accidents postulated to occur in urban areas, Midwest farmland, Western rangeland, and forest. Per-area remediation costs have been estimated, using industry-standard methods, for both expedited and extended remediation. Expedited remediation costs have been evaluated for highways, airports, and urban areas. Extended remediation costs have been evaluated for all land uses except highways and airports. The inclusion of cost estimates in risk assessments, together with the conventional estimation of doses and health effects, allows a fuller understanding of the post-accident environment. The insights obtained can be used to minimize economic risks by evaluation of operational and design alternatives, and through development of improved capabilities for accident response.

  10. A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

    Science.gov (United States)

    Foreman, Veronica L.; Le Moigne, Jacqueline; de Weck, Oliver

    2016-01-01

    Satellite constellations present unique capabilities and opportunities to Earth orbiting and near-Earth scientific and communications missions, but also present new challenges to cost estimators. An effective and adaptive cost model is essential to successful mission design and implementation, and as Distributed Spacecraft Missions (DSM) become more common, cost estimating tools must become more representative of these types of designs. Existing cost models often focus on a single spacecraft and require extensive design knowledge to produce high fidelity estimates. Previous research has examined the limitations of existing cost practices as they pertain to the early stages of mission formulation, for both individual satellites and small satellite constellations. Recommendations have been made for how to improve the cost models for individual satellites one-at-a-time, but much of the complexity in constellation and DSM cost modeling arises from constellation systems level considerations that have not yet been examined. This paper constitutes a survey of the current state-of-theart in cost estimating techniques with recommendations for improvements to increase the fidelity of future constellation cost estimates. To enable our investigation, we have developed a cost estimating tool for constellation missions. The development of this tool has revealed three high-priority shortcomings within existing parametric cost estimating capabilities as they pertain to DSM architectures: design iteration, integration and test, and mission operations. Within this paper we offer illustrative examples of these discrepancies and make preliminary recommendations for addressing them. DSM and satellite constellation missions are shifting the paradigm of space-based remote sensing, showing promise in the realms of Earth science, planetary observation, and various heliophysical applications. To fully reap the benefits of DSM technology, accurate and relevant cost estimating capabilities

  11. Construction and operation costs of constructed wetlands treating wastewater.

    Science.gov (United States)

    Gkika, Dimitra; Gikas, Georgios D; Tsihrintzis, Vassilios A

    2014-01-01

    Design data from nine constructed wetlands (CW) facilities of various capacities (population equivalent (PE)) are used to estimate construction and operation costs, and then to derive empirical equations relating the required facility land area and the construction cost to PE. In addition, comparisons between the costs of CW facilities based on various alternative construction materials, i.e., reinforced concrete and earth structures (covered with either high density polyethylene or clay), are presented in relation to the required area. The results show that earth structures are economically advantageous. The derived equations can be used for providing a preliminary cost estimate of CW facilities for domestic wastewater treatment.

  12. ETE-EVAL: a methodology for D and D cost estimation

    International Nuclear Information System (INIS)

    Decobert, G.; Robic, S.; Vanel, V.

    2008-01-01

    In compliance with Article 20 of the sustainable radioactive materials and waste management act dated 28 June 2006, the CEA and AREVA are required every three years to revise the cost of decommissioning their facilities and to provide the necessary assets by constituting a dedicated fund. For the 2007 revision the CEA used ETE-EVAL V5. Similarly, AREVA reevaluated the cost of decontaminating and dismantling its facilities at La Hague, as the previous estimate in 2004 did not take into account the complete cleanup of all the structural work. ETE-EVAL V5 is a computer application designed to estimate the cost of decontamination and dismantling of basic nuclear installations (INB). It has been qualified by Bureau Veritas and audited. ETE-EVAL V5 has become the official software for cost assessment of CEA civilian and AREVA decommissioning projects. It has been used by the DPAD (Decontamination and Dismantling Projects Department) cost assessment group to estimate the cost of decommissioning some thirty facilities (cost update on completion for the dedicated fund for dismantling civilian CEA facilities) and by AREVA to estimate the cost of decommissioning its fuel cycle back-end facilities. Some necessary modifications are now being implemented to allow for the specific aspects of fuel cycle front-end facilities. The computational method is based on physical, radiological and waste inventories following a particular methodology, and on interviews with operating personnel to compile ratios and financial data (operating cost, etc.) and enter them in a database called GREEN (from the French acronym for Management Ratios for Assessment of Nuclear Facilities). ETE-EVAL V5 comprises the cost assessment module and GREEN database. It has been enriched with the lessons learned from experience, and can be adapted as necessary to meet installation-specific requirements. The cost assessment module allows the user to estimate decommissioning costs once the inventory has been

  13. The Psychology of Cost Estimating

    Science.gov (United States)

    Price, Andy

    2016-01-01

    Cost estimation for large (and even not so large) government programs is a challenge. The number and magnitude of cost overruns associated with large Department of Defense (DoD) and National Aeronautics and Space Administration (NASA) programs highlight the difficulties in developing and promulgating accurate cost estimates. These overruns can be the result of inadequate technology readiness or requirements definition, the whims of politicians or government bureaucrats, or even as failures of the cost estimating profession itself. However, there may be another reason for cost overruns that is right in front of us, but only recently have we begun to grasp it: the fact that cost estimators and their customers are human. The last 70+ years of research into human psychology and behavioral economics have yielded amazing findings into how we humans process and use information to make judgments and decisions. What these scientists have uncovered is surprising: humans are often irrational and illogical beings, making decisions based on factors such as emotion and perception, rather than facts and data. These built-in biases to our thinking directly affect how we develop our cost estimates and how those cost estimates are used. We cost estimators can use this knowledge of biases to improve our cost estimates and also to improve how we communicate and work with our customers. By understanding how our customers think, and more importantly, why they think the way they do, we can have more productive relationships and greater influence. By using psychology to our advantage, we can more effectively help the decision maker and our organizations make fact-based decisions.

  14. A cost and operational effectiveness analysis of alternative anti-surface warfare platforms

    OpenAIRE

    Skinner, Walter Mark.

    1993-01-01

    Approved for public release; distribution is unlimited. A Cost and Operational Effectiveness Analysis (COEA) is performed for three alternative anti-surface warfare (ASUW) platforms that will conduct operations in multi-service regional scenarios. Estimated program costs, historical cost variances, and measures of operational effectiveness are determined for each COEA alternative, and service life extension effects are examined. The data is merged in a mixed-integer optimization model, MPA...

  15. Cost estimate of electricity produced by TPV

    Science.gov (United States)

    Palfinger, Günther; Bitnar, Bernd; Durisch, Wilhelm; Mayor, Jean-Claude; Grützmacher, Detlev; Gobrecht, Jens

    2003-05-01

    A crucial parameter for the market penetration of TPV is its electricity production cost. In this work a detailed cost estimate is performed for a Si photocell based TPV system, which was developed for electrically self-powered operation of a domestic heating system. The results are compared to a rough estimate of cost of electricity for a projected GaSb based system. For the calculation of the price of electricity, a lifetime of 20 years, an interest rate of 4.25% per year and maintenance costs of 1% of the investment are presumed. To determine the production cost of TPV systems with a power of 12-20 kW, the costs of the TPV components and 100 EUR kW-1el,peak for assembly and miscellaneous were estimated. Alternatively, the system cost for the GaSb system was derived from the cost of the photocells and from the assumption that they account for 35% of the total system cost. The calculation was done for four different TPV scenarios which include a Si based prototype system with existing technology (etasys = 1.0%), leading to 3000 EUR kW-1el,peak, an optimized Si based system using conventional, available technology (etasys = 1.5%), leading to 900 EUR kW-1el,peak, a further improved system with future technology (etasys = 5%), leading to 340 EUR kW-1el,peak and a GaSb based system (etasys = 12.3% with recuperator), leading to 1900 EUR kW-1el,peak. Thus, prices of electricity from 6 to 25 EURcents kWh-1el (including gas of about 3.5 EURcents kWh-1) were calculated and compared with those of fuel cells (31 EURcents kWh-1) and gas engines (23 EURcents kWh-1).

  16. Guideline to Estimate Decommissioning Costs

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Taesik; Kim, Younggook; Oh, Jaeyoung [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    The primary objective of this work is to provide guidelines to estimate the decommissioning cost as well as the stakeholders with plausible information to understand the decommissioning activities in a reasonable manner, which eventually contribute to acquiring the public acceptance for the nuclear power industry. Although several cases of the decommissioning cost estimate have been made for a few commercial nuclear power plants, the different technical, site-specific and economic assumptions used make it difficult to interpret those cost estimates and compare them with that of a relevant plant. Trustworthy cost estimates are crucial to plan a safe and economic decommissioning project. The typical approach is to break down the decommissioning project into a series of discrete and measurable work activities. Although plant specific differences derived from the economic and technical assumptions make a licensee difficult to estimate reliable decommissioning costs, estimating decommissioning costs is the most crucial processes since it encompasses all the spectrum of activities from the planning to the final evaluation on whether a decommissioning project has successfully been preceded from the perspective of safety and economic points. Hence, it is clear that tenacious efforts should be needed to successfully perform the decommissioning project.

  17. Contractor-style tunnel cost estimating

    International Nuclear Information System (INIS)

    Scapuzzi, D.

    1990-06-01

    Keeping pace with recent advances in construction technology is a challenge for the cost estimating engineer. Using an estimating style that simulates the actual construction process and is similar in style to the contractor's estimate will give a realistic view of underground construction costs. For a contractor-style estimate, a mining method is chosen; labor crews, plant and equipment are selected, and advance rates are calculated for the various phases of work which are used to determine the length of time necessary to complete each phase of work. The durations are multiplied by the cost or labor and equipment per unit of time and, along with the costs for materials and supplies, combine to complete the estimate. Variations in advance rates, ground support, labor crew size, or other areas are more easily analyzed for their overall effect on the cost and schedule of a project. 14 figs

  18. Cost management in a nuclear operating environment

    International Nuclear Information System (INIS)

    Steckel, J.K.; Gruber, C.O.

    1985-01-01

    This paper presents an integrated philosophy and program for managing costs in a nuclear operating environment. The ideas presented here are being used by Pennsyvania Power and Light Company (PPandL) at the Susquehanna Steam Electric Station. Three basic ideas necessary to successful cost management are listed and include: recognize the framework that is needed to ''manage'': treat cost as part of an integrated plan; and apply different techniques to different types of work activities. It is the author's opinion that the technical framework of a successful cost management system must include all work activities but recognize types. Project activities should be managed to a defined scope and authorized cost using a well communicated estimating program, aggressive trending and forecasting, and a change identification process

  19. Cost Estimating Handbook for Environmental Restoration

    International Nuclear Information System (INIS)

    1993-01-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals

  20. LIFE Cost of Electricity, Capital and Operating Costs

    International Nuclear Information System (INIS)

    Anklam, T.

    2011-01-01

    Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

  1. Effect of Resident Involvement on Operative Time and Operating Room Staffing Costs.

    Science.gov (United States)

    Allen, Robert William; Pruitt, Mark; Taaffe, Kevin M

    The operating room (OR) is a major driver of hospital costs; therefore, operative time is an expensive resource. The training of surgical residents must include time spent in the OR, but that experience comes with a cost to the surgeon and hospital. The objective of this article is to determine the effect of surgical resident involvement in the OR on operative time and subsequent hospital labor costs. The Kruskal-Wallis statistical test is used to determine whether or not there is a difference in operative times between 2 groups of cases (with residents and without residents). This difference leads to an increased cost in associated hospital labor costs for the group with the longer operative time. Cases were performed at Greenville Memorial Hospital. Greenville Memorial Hospital is part of the larger healthcare system, Greenville Health System, located in Greenville, SC and is a level 1 trauma center with up to 33 staffed ORs. A total of 84,997 cases were performed at the partnering hospital between January 1st, 2011 and July 31st, 2015. Cases were only chosen for analysis if there was only one CPT code associated with the case and there were more than 5 observations for each group being studied. This article presents a comprehensive retrospective analysis of 29,134 cases covering 246 procedures. The analysis shows that 45 procedures took significantly longer with a resident present in the room. The average increase in operative time was 4.8 minutes and the cost per minute of extra operative time was determined to be $9.57 per minute. OR labor costs at the partnering hospital was found to be $2,257,433, or $492,889 per year. Knowing the affect on operative time and OR costs allows managers to make smart decisions when considering alternative educational and training techniques. In addition, knowing the connection between residents in the room and surgical duration could help provide better estimates of surgical time in the future and increase the predictability of

  2. Launch vehicle operations cost reduction through artificial intelligence techniques

    Science.gov (United States)

    Davis, Tom C., Jr.

    1988-01-01

    NASA's Kennedy Space Center has attempted to develop AI methods in order to reduce the cost of launch vehicle ground operations as well as to improve the reliability and safety of such operations. Attention is presently given to cost savings estimates for systems involving launch vehicle firing-room software and hardware real-time diagnostics, as well as the nature of configuration control and the real-time autonomous diagnostics of launch-processing systems by these means. Intelligent launch decisions and intelligent weather forecasting are additional applications of AI being considered.

  3. Analysis of capital and operating costs associated with high level waste solidification processes

    International Nuclear Information System (INIS)

    Heckman, R.A.; Kniazewycz, B.G.

    1978-03-01

    An analysis was performed to evaluate the sensitivity of annual operating costs and capital costs of waste solidification processes to various parameters defined by the requirements of a proposed Federal waste repository. Five process methods and waste forms examined were: salt cake, spray calcine, fluidized bed calcine, borosilicate glass, and supercalcine multibarrier. Differential cost estimates of the annual operating and maintenance costs and the capital costs for the five HLW solidification alternates were developed

  4. Estimated cost of overactive bladder in Thailand.

    Science.gov (United States)

    Prasopsanti, Kriangsak; Santi-Ngamkun, Apirak; Pornprasit, Kanokwan

    2007-11-01

    To estimate the annual direct and indirect costs of overactive bladder (OAB) in indigenous Thai people aged 18 years and over in the year 2005. Economically based models using diagnostic and treatment algorithms from clinical practice guidelines and current disease prevalence data were used to estimate direct and indirect costs of OAB. Prevalence and event probability estimates were obtained from the literature, national data sets, and expert opinion. Costs were estimated from a small survey using a cost questionnaire and from unit costs of King Chulalongkorn Memorial Hospital. The annual cost of OAB in Thailand is estimated as 1.9 billion USD. It is estimated to consume 1.14% of national GDP The cost includes 0.33 billion USD for direct medical costs, 1.3 billion USD for direct, nonmedical costs and 0.29 billion USD for indirect costs of lost productivity. The largest costs category was direct treatment costs of comorbidities associated with OAB. Costs of OAB medication accountedfor 14% of the total costs ofOAB.

  5. Estimating the Costs of Preventive Interventions

    Science.gov (United States)

    Foster, E. Michael; Porter, Michele M.; Ayers, Tim S.; Kaplan, Debra L.; Sandler, Irwin

    2007-01-01

    The goal of this article is to improve the practice and reporting of cost estimates of prevention programs. It reviews the steps in estimating the costs of an intervention and the principles that should guide estimation. The authors then review prior efforts to estimate intervention costs using a sample of well-known but diverse studies. Finally,…

  6. Cost analysis of operating an all-digital radiology department

    International Nuclear Information System (INIS)

    Arenson, R.L.; Soshadri, S.B.; DeSimone, D.; Hiss, S.S.

    1988-01-01

    Using the current film system as a baseline, this study analyzes the cost of digital acquisition, transmission, archiving, and display of all images generated in our department. Two approaches are considered: (1) conventional x-ray films are digitized with a laser scanning film digitizer; (2) images are captured with a direct digital receptor and no film is created. In both approaches, images from digital modalities are acquired directly from the scanners. The cost of equipment and its maintenance, film, supplies, storage space, operations, personnel, and so forth are analyzed for all approaches. The annual cost of operating the film system is $2.5 million. The estimated annual cost is $2.3 million for the first digital approach, $1.8 million for the second. This analysis demonstrates that these digital approaches can be cost-effective, viable alternatives to film-bases systems

  7. A new approach for product cost estimation using data envelopment analysis

    Directory of Open Access Journals (Sweden)

    Adil Salam

    2012-10-01

    Full Text Available Cost estimation of new products has always been difficult as only few design, manufacturing and operational features will be known. In these situations, parametric or non-parametric methods are commonly used to estimate the cost of a product given the corresponding cost drivers. The parametric models use priori determined cost function where the parameters of the function are evaluated from historical data. Non-parametric methods, on the other hand, attempt to fit curves to the historic data without predetermined function. In both methods, it is assumed that the historic data used in the analysis is a true representation of the relation between the cost drivers and the corresponding costs. However, because of efficiency variations of the manufacturers and suppliers, changes in supplier selections, market fluctuations, and several other reasons, certain costs in the historic data may be too high whereas other costs may represent better deals for their corresponding cost drivers. Thus, it may be important to rank the historic data and identify benchmarks and estimate the target costs of the product based on these benchmarks. In this paper, a novel adaptation of cost drivers and cost data is introduced in order to use data envelopment analysis for the purpose of ranking cost data and identify benchmarks, and then estimate the target costs of a new product based on these benchmarks. An illustrative case study has been presented for the cost estimation of landing gears of an aircraft manufactured by an aerospace company located in Montreal, CANADA.

  8. Operational Waste Stream Assumption for TSLCC Estimates

    International Nuclear Information System (INIS)

    Gillespie, S.

    2000-01-01

    This document provides the background and basis for the operational waste stream used in the 2000 Total System Life Cycle Cost (TSLCC) estimate for the Civilian Radioactive Waste Management System (CRWMS). This document has been developed in accordance with its Development Plan (CRWMS MandO 2000a), and AP-3.11Q, ''Technical Reports''

  9. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  10. Estimating pressurized water reactor decommissioning costs: A user's manual for the PWR Cost Estimating Computer Program (CECP) software

    International Nuclear Information System (INIS)

    Bierschbach, M.C.; Mencinsky, G.J.

    1993-10-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the US Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user's manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personnel computer, provides estimates for the cost of decommissioning PWR plant stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning

  11. Cost-estimating relationships for space programs

    Science.gov (United States)

    Mandell, Humboldt C., Jr.

    1992-01-01

    Cost-estimating relationships (CERs) are defined and discussed as they relate to the estimation of theoretical costs for space programs. The paper primarily addresses CERs based on analogous relationships between physical and performance parameters to estimate future costs. Analytical estimation principles are reviewed examining the sources of errors in cost models, and the use of CERs is shown to be affected by organizational culture. Two paradigms for cost estimation are set forth: (1) the Rand paradigm for single-culture single-system methods; and (2) the Price paradigms that incorporate a set of cultural variables. For space programs that are potentially subject to even small cultural changes, the Price paradigms are argued to be more effective. The derivation and use of accurate CERs is important for developing effective cost models to analyze the potential of a given space program.

  12. Cost-estimating for commercial digital printing

    Science.gov (United States)

    Keif, Malcolm G.

    2007-01-01

    The purpose of this study is to document current cost-estimating practices used in commercial digital printing. A research study was conducted to determine the use of cost-estimating in commercial digital printing companies. This study answers the questions: 1) What methods are currently being used to estimate digital printing? 2) What is the relationship between estimating and pricing digital printing? 3) To what extent, if at all, do digital printers use full-absorption, all-inclusive hourly rates for estimating? Three different digital printing models were identified: 1) Traditional print providers, who supplement their offset presswork with digital printing for short-run color and versioned commercial print; 2) "Low-touch" print providers, who leverage the power of the Internet to streamline business transactions with digital storefronts; 3) Marketing solutions providers, who see printing less as a discrete manufacturing process and more as a component of a complete marketing campaign. Each model approaches estimating differently. Understanding and predicting costs can be extremely beneficial. Establishing a reliable system to estimate those costs can be somewhat challenging though. Unquestionably, cost-estimating digital printing will increase in relevance in the years ahead, as margins tighten and cost knowledge becomes increasingly more critical.

  13. Estimation of 18FDG doses's cost

    International Nuclear Information System (INIS)

    Hamza, Fatma; Amouri, W.; Jardak, I.; Kallel, F.; Charfeddine, S.; Guermazi, F.

    2013-01-01

    The cyclotron facility, essentially for medical use, is far from being a simple establishment of a dedicated device to accelerate particles producing a beta plus emitter radioelement. The cyclotron site encompasses more over all necessary equipments for the production and the quality control of considered radiotracer that 18 FDG is just one example. This facility is subject to strict standards in terms of radiopharmaceutical production, radiation level, pressure level and airflow resulting in the production of a drug submitted to the MA (Marketing Authorization). These multiple factors directly influence the final cost of the dose that remains to be reachable by the patient. The aim of this work is to estimate the cost of a dose of 18 FDG to ensure financial viability of the project while accessible to the patient. The cost of the facility will entail the following: buildings and utilities, equipment and operational cost. This calculation is possible only if we define in advance the type of cyclotron, which is bound to the market needs in particular the number of PET facilities, the number of scans per day and the radioactive decay of radioelement. Our study represents a simulation that considers some hypothesis. We assumed that the cyclotron is installed in Sousse and that the PET facilities number (positon emission tomography) is 6 in which 4 are located 2 hours away. For a PET scan, the average dose per patient is about 350 MBq (5 MBq/kg) and the exam duration is about 45 minutes. Each center performs 10 tests per day. In terms of fees, we considered device and building's cost, facility amortization, consumables (target, marking accessories), maintenance, remuneration expense and the annual electricity consumption. All our calculations have been reported to the number of working days per year. The estimates were made outside the customs duties and technical assistance that may last up to 2 years. Requirements and needs were estimated at 5.4 curies per day. For

  14. A HEDONIC APPROACH TO ESTIMATING OPERATION AND MAINTENANCE COSTS FOR NEW YORK MUNICIPAL WATER SYSTEMS

    OpenAIRE

    Schmit, Todd M.; Boisvert, Richard N.

    1997-01-01

    A hedonic cost function is used to isolate the operation and maintenance costs for water treatments. For small systems, costs are substantial for some technologies, but not for others. When regional differences in input costs are accounted for, small systems located in rural areas may have a cost advantage over similar systems closer to urban centers; however, costs of water treatment to meet Safe Drinking Water Act amendments may still be substantial.

  15. Importance of funding in decommissioning cost estimates

    International Nuclear Information System (INIS)

    Mingst, B.C.

    1987-01-01

    Decommissioning cost estimates have been made by several study groups for the decommissioning of pressurized-water and boiling-water nuclear power stations. The results of these studies are comparable when corrected for inflation and the differences in contingency factors applied by the study groups. The estimated dismantling costs differ far less than a factor of 2 in all cases, despite the design differences found in the plants that were studied. An analysis of the different methods available for funding the dismantling of these facilities shows the much stronger effect that the choice of funding methods has on the net cost of decommissioning. The total cost of dismantling may vary more than a factor of 4 from one funding method to another, assuming current or recent historical inflation rates. The funding methods evaluated include sinking funds, deposits, negative-salvage value depreciation, and insurance. These funding methods are taken from the NRC's Notice of Proposed Rulemaking description of acceptable funding methods. The funding analysis for this study was performed using the DECOST-86 computer code. The evaluation of funding options for a nuclear facility, and the appropriate choice of the funding method best for that facility, are found to be more important than detailed engineering studies in determining the net cost of decommissioning during the early portions of the plant's operating lifetime

  16. Software cost estimation

    NARCIS (Netherlands)

    Heemstra, F.J.

    1992-01-01

    The paper gives an overview of the state of the art of software cost estimation (SCE). The main questions to be answered in the paper are: (1) What are the reasons for overruns of budgets and planned durations? (2) What are the prerequisites for estimating? (3) How can software development effort be

  17. Software cost estimation

    NARCIS (Netherlands)

    Heemstra, F.J.; Heemstra, F.J.

    1993-01-01

    The paper gives an overview of the state of the art of software cost estimation (SCE). The main questions to be answered in the paper are: (1) What are the reasons for overruns of budgets and planned durations? (2) What are the prerequisites for estimating? (3) How can software development effort be

  18. Computerized cost estimation spreadsheet and cost data base for fusion devices

    International Nuclear Information System (INIS)

    Hamilton, W.R.; Rothe, K.E.

    1985-01-01

    An automated approach to performing and cataloging cost estimates has been developed at the Fusion Engineering Design Center (FEDC), wherein the cost estimate record is stored in the LOTUS 1-2-3 spreadsheet on an IBM personal computer. The cost estimation spreadsheet is based on the cost coefficient/cost algorithm approach and incorporates a detailed generic code of cost accounts for both tokamak and tandem mirror devices. Component design parameters (weight, surface area, etc.) and cost factors are input, and direct and indirect costs are calculated. The cost data base file derived from actual cost experience within the fusion community and refined to be compatible with the spreadsheet costing approach is a catalog of cost coefficients, algorithms, and component costs arranged into data modules corresponding to specific components and/or subsystems. Each data module contains engineering, equipment, and installation labor cost data for different configurations and types of the specific component or subsystem. This paper describes the assumptions, definitions, methodology, and architecture incorporated in the development of the cost estimation spreadsheet and cost data base, along with the type of input required and the output format

  19. Well-founded cost estimation validated by experience

    International Nuclear Information System (INIS)

    LaGuardia, T.S.

    2005-01-01

    Full text: Reliable cost estimating is one of the most important elements of decommissioning planning. Alternative technologies may be evaluated and compared based on their efficiency and effectiveness, and measured against a baseline cost as to the feasibility and benefits derived from the technology. When the plan is complete, those cost considerations ensure that it is economically sound and practical for funding. Estimates of decommissioning costs have been performed and published by many organizations for many different applications. The results often vary because of differences in the work scope. Labor force cost, monetary considerations, oversight costs, the specific contaminated materials involved, the waste stream and peripheral costs associated with that type of waste, or applicable environmental compliance requirements. Many of these differences are unavoidable since a reasonable degree of reliability and accuracy can only be achieved by developing decommissioning cost estimates on a case-by-case site-specific basis. This paper describes the estimating methodology and process applied to develop decommissioning cost estimates. A major effort has been made to standardize these methodologies, and to understand the assumptions and bases that drive the costs. However, estimates are only as accurate as the information available from which to derive the costs. This information includes the assumptions of scope of the work, labour cost inputs, inflationary effects, and financial analyses that project these costs to year of expenditure. Attempts at comparison of estimates for two facilities of similar design and size must clearly identify the assumptions used in developing the estimate, and comparison of actual costs versus estimated costs must reflect these same assumptions. For the nuclear industry to grow, decommissioning estimating tools must improve to keep pace with changing technology, regulations and stakeholder issues. The decommissioning industry needs

  20. Fundamental Drivers of the Cost and Price of Operating Reserves

    Energy Technology Data Exchange (ETDEWEB)

    Hummon, Marissa [National Renewable Energy Lab. (NREL), Golden, CO (United States); Denholm, Paul [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jorgenson, Jennie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Palchak, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kirby, Brendan [Kirby Consultant; Ma, Ookie [U.S. Department of Energy, Washington, DC (United States)

    2013-07-01

    Operating reserves impose a cost on the electric power system by forcing system operators to keep partially loaded spinning generators available for responding to system contingencies variable demand. In many regions of the United States, thermal power plants provide a large fraction of the operating reserve requirement. Alternative sources of operating reserves, such as demand response and energy storage, may provide more efficient sources of these reserves. However, to estimate the potential value of these services, the cost of reserve services under various grid conditions must first be established. This analysis used a commercial grid simulation tool to evaluate the cost and price of several operating reserve services, including spinning contingency reserves and upward regulation reserves. These reserve products were evaluated in a utility system in the western United States, considering different system flexibilities, renewable energy penetration, and other sensitivities. The analysis demonstrates that the price of operating reserves depend highly on many assumptions regarding the operational flexibility of the generation fleet, including ramp rates and the fraction of fleet available to provide reserves.

  1. The cost of obesity for nonbariatric inpatient operative procedures in the United States: national cost estimates obese versus nonobese patients.

    Science.gov (United States)

    Mason, Rodney J; Moroney, Jolene R; Berne, Thomas V

    2013-10-01

    To evaluate the economic impact of obesity on hospital costs associated with the commonest nonbariatric, nonobstetrical surgical procedures. Health care costs and obesity are both rising. Nonsurgical costs associated with obesity are well documented but surgical costs are not. National cost estimates were calculated from the Healthcare Cost and Utilization Project (HCUP) Nationwide Inpatient Sample (NIS) database, 2005-2009, for the highest volume nonbariatric nonobstetric procedures. Obesity was identified from the HCUP-NIS severity data file comorbidity index. Costs for obese patients were compared with those for nonobese patients. To control for medical complexity, each obese patient was matched one-to-one with a nonobese patient using age, sex, race, and 28 comorbid defined elements. Of 2,309,699 procedures, 439,8129 (19%) were successfully matched into 2 medically equal groups (obese vs nonobese). Adjusted total hospital costs incurred by obese patients were 3.7% higher with a significantly (P cost of $648 (95% confidence interval [CI]: $556-$736) compared with nonobese patients. Of the 2 major components of hospital costs, length of stay was significantly increased in obese patients (mean difference = 0.0253 days, 95% CI: 0.0225-0.0282) and resource utilization determined by costs per day were greater in obese patients due to an increased number of diagnostic and therapeutic procedures needed postoperatively (odds ratio [OR] = 0.94, 95% CI: 0.93-0.96). Postoperative complications were equivalent in both groups (OR = 0.97, 95% CI: 0.93-1.02). Annual national hospital expenditures for the largest volume surgical procedures is an estimated $160 million higher in obese than in a comparative group of nonobese patients.

  2. Estimating Texas motor vehicle operating costs.

    Science.gov (United States)

    2009-10-01

    A specific Vcost model was developed for Texas conditions based on a sophisticated fuel model for light : duty vehicles, several excellent sources of secondary vehicle cost data, and the ability to measure heavy truck fuel : consumption through both ...

  3. NASA Software Cost Estimation Model: An Analogy Based Estimation Model

    Science.gov (United States)

    Hihn, Jairus; Juster, Leora; Menzies, Tim; Mathew, George; Johnson, James

    2015-01-01

    The cost estimation of software development activities is increasingly critical for large scale integrated projects such as those at DOD and NASA especially as the software systems become larger and more complex. As an example MSL (Mars Scientific Laboratory) developed at the Jet Propulsion Laboratory launched with over 2 million lines of code making it the largest robotic spacecraft ever flown (Based on the size of the software). Software development activities are also notorious for their cost growth, with NASA flight software averaging over 50% cost growth. All across the agency, estimators and analysts are increasingly being tasked to develop reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods there is very little focus on the use of models based on analogy and clustering algorithms. In this paper we summarize our findings on effort/cost model estimation and model development based on ten years of software effort estimation research using data mining and machine learning methods to develop estimation models based on analogy and clustering. The NASA Software Cost Model performance is evaluated by comparing it to COCOMO II, linear regression, and K-­ nearest neighbor prediction model performance on the same data set.

  4. Operating and support costs and affordability of a 324 ship Naval battle force

    OpenAIRE

    Antonucci, Kevin C.

    2011-01-01

    The purpose of this research was to determine both the added operating and support (OandS) costs and affordability of operating and maintaining a future naval battle force of 324 ships as proposed in the Navy's 30-year shipbuilding plan. Cost estimation including regression, 3-year moving averages, point, expert and analogous modeling was used to capture both historical and future OandS costs from FY1991 to FY2024. With an emphasis on the three main cost drivers, (manpower, fuel and maintena...

  5. Parametric cost estimation for space science missions

    Science.gov (United States)

    Lillie, Charles F.; Thompson, Bruce E.

    2008-07-01

    Cost estimation for space science missions is critically important in budgeting for successful missions. The process requires consideration of a number of parameters, where many of the values are only known to a limited accuracy. The results of cost estimation are not perfect, but must be calculated and compared with the estimates that the government uses for budgeting purposes. Uncertainties in the input parameters result from evolving requirements for missions that are typically the "first of a kind" with "state-of-the-art" instruments and new spacecraft and payload technologies that make it difficult to base estimates on the cost histories of previous missions. Even the cost of heritage avionics is uncertain due to parts obsolescence and the resulting redesign work. Through experience and use of industry best practices developed in participation with the Aerospace Industries Association (AIA), Northrop Grumman has developed a parametric modeling approach that can provide a reasonably accurate cost range and most probable cost for future space missions. During the initial mission phases, the approach uses mass- and powerbased cost estimating relationships (CER)'s developed with historical data from previous missions. In later mission phases, when the mission requirements are better defined, these estimates are updated with vendor's bids and "bottoms- up", "grass-roots" material and labor cost estimates based on detailed schedules and assigned tasks. In this paper we describe how we develop our CER's for parametric cost estimation and how they can be applied to estimate the costs for future space science missions like those presented to the Astronomy & Astrophysics Decadal Survey Study Committees.

  6. Aircraft ground damage and the use of predictive models to estimate costs

    Science.gov (United States)

    Kromphardt, Benjamin D.

    Aircraft are frequently involved in ground damage incidents, and repair costs are often accepted as part of doing business. The Flight Safety Foundation (FSF) estimates ground damage to cost operators $5-10 billion annually. Incident reports, documents from manufacturers or regulatory agencies, and other resources were examined to better understand the problem of ground damage in aviation. Major contributing factors were explained, and two versions of a computer-based model were developed to project costs and show what is possible. One objective was to determine if the models could match the FSF's estimate. Another objective was to better understand cost savings that could be realized by efforts to further mitigate the occurrence of ground incidents. Model effectiveness was limited by access to official data, and assumptions were used if data was not available. However, the models were determined to sufficiently estimate the costs of ground incidents.

  7. ICPP tank farm closure study. Volume III: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This volume contains information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the six options described in Volume 1, Section 2: Option 1 -- Total removal clean closure; No subsequent use; Option 2 -- Risk-based clean closure; LLW fill; Option 3 -- Risk-based clean closure; CERCLA fill; Option 4 -- Close to RCRA landfill standards; LLW fill; Option 5 -- Close to RCRA landfill standards; CERCLA fill; and Option 6 -- Close to RCRA landfill standards; Clean fill. This volume is divided into two portions. The first portion contains the cost and planning schedule estimates while the second portion contains life-cycle costs and yearly cash flow information for each option

  8. Cost Estimation and Control for Flight Systems

    Science.gov (United States)

    Hammond, Walter E.; Vanhook, Michael E. (Technical Monitor)

    2002-01-01

    Good program management practices, cost analysis, cost estimation, and cost control for aerospace flight systems are interrelated and depend upon each other. The best cost control process cannot overcome poor design or poor systems trades that lead to the wrong approach. The project needs robust Technical, Schedule, Cost, Risk, and Cost Risk practices before it can incorporate adequate Cost Control. Cost analysis both precedes and follows cost estimation -- the two are closely coupled with each other and with Risk analysis. Parametric cost estimating relationships and computerized models are most often used. NASA has learned some valuable lessons in controlling cost problems, and recommends use of a summary Project Manager's checklist as shown here.

  9. Estimating the cost of a smoking employee.

    Science.gov (United States)

    Berman, Micah; Crane, Rob; Seiber, Eric; Munur, Mehmet

    2014-09-01

    We attempted to estimate the excess annual costs that a US private employer may attribute to employing an individual who smokes tobacco as compared to a non-smoking employee. Reviewing and synthesising previous literature estimating certain discrete costs associated with smoking employees, we developed a cost estimation approach that approximates the total of such costs for U.S. employers. We examined absenteeism, presenteesim, smoking breaks, healthcare costs and pension benefits for smokers. Our best estimate of the annual excess cost to employ a smoker is $5816. This estimate should be taken as a general indicator of the extent of excess costs, not as a predictive point value. Employees who smoke impose significant excess costs on private employers. The results of this study may help inform employer decisions about tobacco-related policies. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  10. Operations Assessment of Launch Vehicle Architectures using Activity Based Cost Models

    Science.gov (United States)

    Ruiz-Torres, Alex J.; McCleskey, Carey

    2000-01-01

    The growing emphasis on affordability for space transportation systems requires the assessment of new space vehicles for all life cycle activities, from design and development, through manufacturing and operations. This paper addresses the operational assessment of launch vehicles, focusing on modeling the ground support requirements of a vehicle architecture, and estimating the resulting costs and flight rate. This paper proposes the use of Activity Based Costing (ABC) modeling for this assessment. The model uses expert knowledge to determine the activities, the activity times and the activity costs based on vehicle design characteristics. The approach provides several advantages to current approaches to vehicle architecture assessment including easier validation and allowing vehicle designers to understand the cost and cycle time drivers.

  11. Outer planet probe cost estimates: First impressions

    Science.gov (United States)

    Niehoff, J.

    1974-01-01

    An examination was made of early estimates of outer planetary atmospheric probe cost by comparing the estimates with past planetary projects. Of particular interest is identification of project elements which are likely cost drivers for future probe missions. Data are divided into two parts: first, the description of a cost model developed by SAI for the Planetary Programs Office of NASA, and second, use of this model and its data base to evaluate estimates of probe costs. Several observations are offered in conclusion regarding the credibility of current estimates and specific areas of the outer planet probe concept most vulnerable to cost escalation.

  12. Development of Cost Estimation Methodology of Decommissioning for PWR

    International Nuclear Information System (INIS)

    Lee, Sang Il; Yoo, Yeon Jae; Lim, Yong Kyu; Chang, Hyeon Sik; Song, Geun Ho

    2013-01-01

    The permanent closure of nuclear power plant should be conducted with the strict laws and the profound planning including the cost and schedule estimation because the plant is very contaminated with the radioactivity. In Korea, there are two types of the nuclear power plant. One is the pressurized light water reactor (PWR) and the other is the pressurized heavy water reactor (PHWR) called as CANDU reactor. Also, the 50% of the operating nuclear power plant in Korea is the PWRs which were originally designed by CE (Combustion Engineering). There have been experiences about the decommissioning of Westinghouse type PWR, but are few experiences on that of CE type PWR. Therefore, the purpose of this paper is to develop the cost estimation methodology and evaluate technical level of decommissioning for the application to CE type PWR based on the system engineering technology. The aim of present study is to develop the cost estimation methodology of decommissioning for application to PWR. Through the study, the following conclusions are obtained: · Based on the system engineering, the decommissioning work can be classified as Set, Subset, Task, Subtask and Work cost units. · The Set and Task structure are grouped as 29 Sets and 15 Task s, respectively. · The final result shows the cost and project schedule for the project control and risk management. · The present results are preliminary and should be refined and improved based on the modeling and cost data reflecting available technology and current costs like labor and waste data

  13. The operating cost of electrocoagulation

    Energy Technology Data Exchange (ETDEWEB)

    Donini, J.C.; Kan, J.; Szynkarczuk, J.; Hassan, T.A.; Kar, K.L. (Canadian Centre for Mineral and Energy Technology, Devon, AB (Canada))

    1994-12-01

    The electrocoagulation of kaolinite and bentonite suspensions was studied in a pilot-scale electrocoagulation system to assess the operating cost and efficiency of the process. Factors affecting the operating cost such as formation of passivation layers on electrode plates, flow velocity, and concentration of NaCl in the suspension were examined. The operating costs investigated were the power cost of the electrocoagulation cell and the material cost due to the consumption of the aluminum electrode. Comparison was based on the settling properties of the treated product: turbidity, settling rate, and cake height. Higher NaCl concentration resulted in greater amounts of Al dissolved chemically and electrochemically into the suspension and thus a better clarity of the supernatant of the treated product. Increased flow velocity could reduce significantly the operating cost while improving both clarity of the supernatant and compactness of the sludge volume. The passivation layers developed quickly with time during the electrocoagulation process and more energy became wasted on the layers. 10 refs., 12 figs.

  14. Decommissioning Cost Estimating -The ''Price'' Approach

    International Nuclear Information System (INIS)

    Manning, R.; Gilmour, J.

    2002-01-01

    Over the past 9 years UKAEA has developed a formalized approach to decommissioning cost estimating. The estimating methodology and computer-based application are known collectively as the PRICE system. At the heart of the system is a database (the knowledge base) which holds resource demand data on a comprehensive range of decommissioning activities. This data is used in conjunction with project specific information (the quantities of specific components) to produce decommissioning cost estimates. PRICE is a dynamic cost-estimating tool, which can satisfy both strategic planning and project management needs. With a relatively limited analysis a basic PRICE estimate can be produced and used for the purposes of strategic planning. This same estimate can be enhanced and improved, primarily by the improvement of detail, to support sanction expenditure proposals, and also as a tender assessment and project management tool. The paper will: describe the principles of the PRICE estimating system; report on the experiences of applying the system to a wide range of projects from contaminated car parks to nuclear reactors; provide information on the performance of the system in relation to historic estimates, tender bids, and outturn costs

  15. Estimating the unit costs of public hospitals and primary healthcare centers.

    Science.gov (United States)

    Younis, Mustafa Z; Jaber, Samer; Mawson, Anthony R; Hartmann, Michael

    2013-01-01

    Many factors have affected the rise of health expenditures, such as high-cost medical technologies, changes in disease patterns and increasing demand for health services. All countries allocate a significant portion of resources to the health sector. In 2008, the gross domestic product of Palestine was estimated to be at $6.108bn (current price) or about $1697 per capita. Health expenditures are estimated at 15.6% of the gross domestic product, almost as much as those of Germany, Japan and other developed countries. The numbers of hospitals, hospital beds and primary healthcare centers in the country have all increased. The Ministry of Health (MOH) currently operates 27 of 76 hospitals, with a total of 3074 beds, which represent 61% of total beds of all hospitals in the Palestinian Authorities area. Also, the MOH is operating 453 of 706 Primary Health Care facilities. By 2007, about 40 000 people were employed in different sectors of the health system, with 33% employed by the MOH. This purpose of this study was to develop a financing strategy to help cover some or all of the costs involved in operating such institutions and to estimate the unit cost of primary and secondary programs and departments. A retrospective study was carried out on data from government hospitals and primary healthcare centers to identify and analyze the costs and output (patient-related services) and to estimate the unit cost of health services provided by hospitals and PHCs during the year 2008. All operating costs are assigned and allocated to the departments at MOH hospitals and primary health care centers (PPHCs) and are identified as overhead departments, intermediate-service and final-service departments. Intermediate-service departments provide procedures and services to patients in the final-service departments. The costs of the overhead departments are distributed to the intermediate-service and final-service departments through a step-down method, according to allocation

  16. Towards Greater Harmonisation of Decommissioning Cost Estimates

    International Nuclear Information System (INIS)

    O'Sullivan, Patrick; ); Laraia, Michele; ); LaGuardia, Thomas S.

    2010-01-01

    The NEA Decommissioning Cost Estimation Group (DCEG), in collaboration with the IAEA Waste Technology Section and the EC Directorate-General for Energy and Transport, has recently studied cost estimation practices in 12 countries - Belgium, Canada, France, Germany, Italy, Japan, the Netherlands, Slovakia, Spain, Sweden, the United Kingdom and the United States. Its findings are to be published in an OECD/NEA report entitled Cost Estimation for Decommissioning: An International Overview of Cost Elements, Estimation Practices and Reporting Requirements. This booklet highlights the findings contained in the full report. (authors)

  17. Estimating the Cost of Neurosurgical Procedures in a Low-Income Setting: An Observational Economic Analysis.

    Science.gov (United States)

    Abdelgadir, Jihad; Tran, Tu; Muhindo, Alex; Obiga, Doomwin; Mukasa, John; Ssenyonjo, Hussein; Muhumza, Michael; Kiryabwire, Joel; Haglund, Michael M; Sloan, Frank A

    2017-05-01

    There are no data on cost of neurosurgery in low-income and middle-income countries. The objective of this study was to estimate the cost of neurosurgical procedures in a low-resource setting to better inform resource allocation and health sector planning. In this observational economic analysis, microcosting was used to estimate the direct and indirect costs of neurosurgical procedures at Mulago National Referral Hospital (Kampala, Uganda). During the study period, October 2014 to September 2015, 1440 charts were reviewed. Of these patients, 434 had surgery, whereas the other 1006 were treated nonsurgically. Thirteen types of procedures were performed at the hospital. The estimated mean cost of a neurosurgical procedure was $542.14 (standard deviation [SD], $253.62). The mean cost of different procedures ranged from $291 (SD, $101) for burr hole evacuations to $1,221 (SD, $473) for excision of brain tumors. For most surgeries, overhead costs represented the largest proportion of the total cost (29%-41%). This is the first study using primary data to determine the cost of neurosurgery in a low-resource setting. Operating theater capacity is likely the binding constraint on operative volume, and thus, investing in operating theaters should achieve a higher level of efficiency. Findings from this study could be used by stakeholders and policy makers for resource allocation and to perform economic analyses to establish the value of neurosurgery in achieving global health goals. Copyright © 2017 Elsevier Inc. All rights reserved.

  18. Preliminary cost estimating for the nuclear industry

    International Nuclear Information System (INIS)

    Klumpar, I.V.; Soltz, K.M.

    1985-01-01

    The nuclear industry has higher costs for personnel, equipment, construction, and engineering than conventional industry, which means that cost estimation procedures may need adjustment. The authors account for the special technical and labor requirements of the nuclear industry in making adjustments to equipment and installation cost estimations. Using illustrative examples, they show that conventional methods of preliminary cost estimation are flexible enough for application to emerging industries if their cost structure is similar to that of the process industries. If not, modifications can provide enough engineering and cost data for a statistical analysis. 9 references, 14 figures, 4 tables

  19. Software Cost-Estimation Model

    Science.gov (United States)

    Tausworthe, R. C.

    1985-01-01

    Software Cost Estimation Model SOFTCOST provides automated resource and schedule model for software development. Combines several cost models found in open literature into one comprehensive set of algorithms. Compensates for nearly fifty implementation factors relative to size of task, inherited baseline, organizational and system environment and difficulty of task.

  20. Life cycle cost estimation and systems analysis of Waste Management Facilities

    International Nuclear Information System (INIS)

    Shropshire, D.; Feizollahi, F.

    1995-01-01

    This paper presents general conclusions from application of a system cost analysis method developed by the United States Department of Energy (DOE), Waste Management Division (WM), Waste Management Facilities Costs Information (WMFCI) program. The WMFCI method has been used to assess the DOE complex-wide management of radioactive, hazardous, and mixed wastes. The Idaho Engineering Laboratory, along with its subcontractor Morrison Knudsen Corporation, has been responsible for developing and applying the WMFCI cost analysis method. The cost analyses are based on system planning level life-cycle costs. The costs for life-cycle waste management activities estimated by WMFCI range from bench-scale testing and developmental work needed to design and construct a facility, facility permitting and startup, operation and maintenance, to the final decontamination, decommissioning, and closure of the facility. For DOE complex-wide assessments, cost estimates have been developed at the treatment, storage, and disposal module level and rolled up for each DOE installation. Discussions include conclusions reached by studies covering complex-wide consolidation of treatment, storage, and disposal facilities, system cost modeling, system costs sensitivity, system cost optimization, and the integration of WM waste with the environmental restoration and decontamination and decommissioning secondary wastes

  1. Procedure for estimating permanent total enclosure costs

    Energy Technology Data Exchange (ETDEWEB)

    Lukey, M.E.; Prasad, C.; Toothman, D.A.; Kaplan, N.

    1999-07-01

    Industries that use add-on control devices must adequately capture emissions before delivering them to the control device. One way to capture emissions is to use permanent total enclosures (PTEs). By definition, an enclosure which meets the US Environmental Protection Agency's five-point criteria is a PTE and has a capture efficiency of 100%. Since costs play an important role in regulatory development, in selection of control equipment, and in control technology evaluations for permitting purposes, EPA has developed a Control Cost Manual for estimating costs of various items of control equipment. EPA's Manual does not contain any methodology for estimating PTE costs. In order to assist environmental regulators and potential users of PTEs, a methodology for estimating PTE costs was developed under contract with EPA, by Pacific Environmental Services, Inc. (PES) and is the subject of this paper. The methodology for estimating PTE costs follows the approach used for other control devices in the Manual. It includes procedures for sizing various components of a PTE and for estimating capital as well as annual costs. It contains verification procedures for demonstrating compliance with EPA's five-point criteria. In addition, procedures are included to determine compliance with Occupational Safety and Health Administration (OSHA) standards. Meeting these standards is an important factor in properly designing PTEs. The methodology is encoded in Microsoft Exel spreadsheets to facilitate cost estimation and PTE verification. Examples are given throughout the methodology development and in the spreadsheets to illustrate the PTE design, verification, and cost estimation procedures.

  2. Procedure for estimating permanent total enclosure costs

    Energy Technology Data Exchange (ETDEWEB)

    Lukey, M E; Prasad, C; Toothman, D A; Kaplan, N

    1999-07-01

    Industries that use add-on control devices must adequately capture emissions before delivering them to the control device. One way to capture emissions is to use permanent total enclosures (PTEs). By definition, an enclosure which meets the US Environmental Protection Agency's five-point criteria is a PTE and has a capture efficiency of 100%. Since costs play an important role in regulatory development, in selection of control equipment, and in control technology evaluations for permitting purposes, EPA has developed a Control Cost Manual for estimating costs of various items of control equipment. EPA's Manual does not contain any methodology for estimating PTE costs. In order to assist environmental regulators and potential users of PTEs, a methodology for estimating PTE costs was developed under contract with EPA, by Pacific Environmental Services, Inc. (PES) and is the subject of this paper. The methodology for estimating PTE costs follows the approach used for other control devices in the Manual. It includes procedures for sizing various components of a PTE and for estimating capital as well as annual costs. It contains verification procedures for demonstrating compliance with EPA's five-point criteria. In addition, procedures are included to determine compliance with Occupational Safety and Health Administration (OSHA) standards. Meeting these standards is an important factor in properly designing PTEs. The methodology is encoded in Microsoft Exel spreadsheets to facilitate cost estimation and PTE verification. Examples are given throughout the methodology development and in the spreadsheets to illustrate the PTE design, verification, and cost estimation procedures.

  3. 28 CFR 100.16 - Cost estimate submission.

    Science.gov (United States)

    2010-07-01

    ..., quantity, and cost. (ii) Direct labor. Provide a time-phased (e.g., monthly, quarterly) breakdown of labor... estimates. (iii) Allocable direct costs. Indicate how allocable costs are computed and applied, including... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Cost estimate submission. 100.16 Section...

  4. IDC Reengineering Phase 2 & 3 Rough Order of Magnitude (ROM) Cost Estimate Summary (Leveraged NDC Case).

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M.; Prescott, Ryan; Dawson, Jericah M.; Huelskamp, Robert M.

    2014-11-01

    Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, based on leveraging a fully funded, Sandia executed NDC Modernization project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

  5. COST ESTIMATING RELATIONSHIPS IN ONSHORE DRILLING PROJECTS

    Directory of Open Access Journals (Sweden)

    Ricardo de Melo e Silva Accioly

    2017-03-01

    Full Text Available Cost estimating relationships (CERs are very important tools in the planning phases of an upstream project. CERs are, in general, multiple regression models developed to estimate the cost of a particular item or scope of a project. They are based in historical data that should pass through a normalization process before fitting a model. In the early phases they are the primary tool for cost estimating. In later phases they are usually used as an estimation validation tool and sometimes for benchmarking purposes. As in any other modeling methodology there are number of important steps to build a model. In this paper the process of building a CER to estimate drilling cost of onshore wells will be addressed.

  6. Estimating the cost of improving quality in electricity distribution: A parametric distance function approach

    International Nuclear Information System (INIS)

    Coelli, Tim J.; Gautier, Axel; Perelman, Sergio; Saplacan-Pop, Roxana

    2013-01-01

    The quality of electricity distribution is being more and more scrutinized by regulatory authorities, with explicit reward and penalty schemes based on quality targets having been introduced in many countries. It is then of prime importance to know the cost of improving the quality for a distribution system operator. In this paper, we focus on one dimension of quality, the continuity of supply, and we estimated the cost of preventing power outages. For that, we make use of the parametric distance function approach, assuming that outages enter in the firm production set as an input, an imperfect substitute for maintenance activities and capital investment. This allows us to identify the sources of technical inefficiency and the underlying trade-off faced by operators between quality and other inputs and costs. For this purpose, we use panel data on 92 electricity distribution units operated by ERDF (Electricité de France - Réseau Distribution) in the 2003–2005 financial years. Assuming a multi-output multi-input translog technology, we estimate that the cost of preventing one interruption is equal to 10.7€ for an average DSO. Furthermore, as one would expect, marginal quality improvements tend to be more expensive as quality itself improves. - Highlights: ► We estimate the implicit cost of outages for the main distribution company in France. ► For this purpose, we make use of a parametric distance function approach. ► Marginal quality improvements tend to be more expensive as quality itself improves. ► The cost of preventing one interruption varies from 1.8 € to 69.2 € (2005 prices). ► We estimate that, in average, it lays 33% above the regulated price of quality.

  7. Cost estimates for near-term depolyment of advanced traffic management systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Stevens, S.S.; Chin, S.M.

    1993-02-15

    The objective of this study is to provide cost est engineering, design, installation, operation and maintenance of Advanced Traffic Management Systems (ATMS) in the largest 75 metropolitan areas in the United States. This report gives estimates for deployment costs for ATMS in the next five years, subject to the qualifications and caveats set out in following paragraphs. The report considers infrastructure components required to realize fully a functional ATMS over each of two highway networks (as discussed in the Section describing our general assumptions) under each of the four architectures identified in the MITRE Intelligent Vehicle Highway Systems (IVHS) Architecture studies. The architectures are summarized in this report in Table 2. Estimates are given for eight combinations of highway networks and architectures. We estimate that it will cost between $8.5 Billion (minimal network) and $26 Billion (augmented network) to proceed immediately with deployment of ATMS in the largest 75 metropolitan areas. Costs are given in 1992 dollars, and are not adjusted for future inflation. Our estimates are based partially on completed project costs, which have been adjusted to 1992 dollars. We assume that a particular architecture will be chosen; projected costs are broken by architecture.

  8. Cost of Equity Estimation in Fuel and Energy Sector Companies Based on CAPM

    Science.gov (United States)

    Kozieł, Diana; Pawłowski, Stanisław; Kustra, Arkadiusz

    2018-03-01

    The article presents cost of equity estimation of capital groups from the fuel and energy sector, listed at the Warsaw Stock Exchange, based on the Capital Asset Pricing Model (CAPM). The objective of the article was to perform a valuation of equity with the application of CAPM, based on actual financial data and stock exchange data and to carry out a sensitivity analysis of such cost, depending on the financing structure of the entity. The objective of the article formulated in this manner has determined its' structure. It focuses on presentation of substantive analyses related to the core of equity and methods of estimating its' costs, with special attention given to the CAPM. In the practical section, estimation of cost was performed according to the CAPM methodology, based on the example of leading fuel and energy companies, such as Tauron GE and PGE. Simultaneously, sensitivity analysis of such cost was performed depending on the structure of financing the company's operation.

  9. Cost of Equity Estimation in Fuel and Energy Sector Companies Based on CAPM

    Directory of Open Access Journals (Sweden)

    Kozieł Diana

    2018-01-01

    Full Text Available The article presents cost of equity estimation of capital groups from the fuel and energy sector, listed at the Warsaw Stock Exchange, based on the Capital Asset Pricing Model (CAPM. The objective of the article was to perform a valuation of equity with the application of CAPM, based on actual financial data and stock exchange data and to carry out a sensitivity analysis of such cost, depending on the financing structure of the entity. The objective of the article formulated in this manner has determined its’ structure. It focuses on presentation of substantive analyses related to the core of equity and methods of estimating its’ costs, with special attention given to the CAPM. In the practical section, estimation of cost was performed according to the CAPM methodology, based on the example of leading fuel and energy companies, such as Tauron GE and PGE. Simultaneously, sensitivity analysis of such cost was performed depending on the structure of financing the company’s operation.

  10. Assuring Software Cost Estimates: Is it an Oxymoron?

    Science.gov (United States)

    Hihn, Jarius; Tregre, Grant

    2013-01-01

    The software industry repeatedly observes cost growth of well over 100% even after decades of cost estimation research and well-known best practices, so "What's the problem?" In this paper we will provide an overview of the current state oj software cost estimation best practice. We then explore whether applying some of the methods used in software assurance might improve the quality of software cost estimates. This paper especially focuses on issues associated with model calibration, estimate review, and the development and documentation of estimates as part alan integrated plan.

  11. Estimation of cost function in the natural gas industry

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Duk [Korea Energy Economics Institute, Euiwang (Korea)

    1999-02-01

    The natural gas industry in Korea has characteristics of a dual industrial structure with wholesale and retail and a regional monopoly of city gas company. Recently there have been discussions on the restructuring of gas industry and the problems arising from such industrial organization. At this point, the labor and capital cost of KOGAS were analyzed to find out efficiency of KOGAS, the wholesaler and the cost function focusing on distribution was estimated to find out effect of scale of city gas company, the retailer. As a result, in the case of KOGAS, it is prove that enhancing competitive power is needed by improving labor productivity through stabilization of labor structure and by maximizing value-added through stability of capital combination. From the estimation of cost function of city gas companies, the existing regional monopoly of city gas company have effects on its scale only when the area of operation and end users used the same amount per end user are increased. (author). 31 refs., 10 figs., 43 tabs.

  12. Estimated generic prices of cancer medicines deemed cost-ineffective in England: a cost estimation analysis.

    Science.gov (United States)

    Hill, Andrew; Redd, Christopher; Gotham, Dzintars; Erbacher, Isabelle; Meldrum, Jonathan; Harada, Ryo

    2017-01-20

    The aim of this study was to estimate lowest possible treatment costs for four novel cancer drugs, hypothesising that generic manufacturing could significantly reduce treatment costs. This research was carried out in a non-clinical research setting using secondary data. There were no human participants in the study. Four drugs were selected for the study: bortezomib, dasatinib, everolimus and gefitinib. These medications were selected according to their clinical importance, novel pharmaceutical actions and the availability of generic price data. Target costs for treatment were to be generated for each indication for each treatment. The primary outcome measure was the target cost according to a production cost calculation algorithm. The secondary outcome measure was the target cost as the lowest available generic price; this was necessary where export data were not available to generate an estimate from our cost calculation algorithm. Other outcomes included patent expiry dates and total eligible treatment populations. Target prices were £411 per cycle for bortezomib, £9 per month for dasatinib, £852 per month for everolimus and £10 per month for gefitinib. Compared with current list prices in England, these target prices would represent reductions of 74-99.6%. Patent expiry dates were bortezomib 2014-22, dasatinib 2020-26, everolimus 2019-25 and gefitinib 2017. The total global eligible treatment population in 1 year is 769 736. Our findings demonstrate that affordable drug treatment costs are possible for novel cancer drugs, suggesting that new therapeutic options can be made available to patients and doctors worldwide. Assessing treatment cost estimations alongside cost-effectiveness evaluations is an important area of future research. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  13. Development of LLW and VLLW disposal business cost estimation system

    International Nuclear Information System (INIS)

    Koibuchi, Hiroko; Ishiguro, Hideharu; Matsuda, Kenji

    2004-01-01

    In order to undertake the LLW and VLLW disposal business, various examinations are carried out in RANDEC. Since it is important in undertaking this business to secure funds, a disposal cost must be calculated by way of trial. However, at present, there are many unknown factors such as the amount of wastes, a disposal schedule, the location of a disposal site, and so on, and the cost cannot be determined. Meanwhile, the cost depends on complicated relations among these factors. Then, a 'LLW and VLLW disposal business cost estimation system' has been developed to calculate the disposal cost easily. This system can calculate an annual balance of payments by using a construction and operation cost of disposal facilities, considering economic parameters of tax, inflation rate, interest rate and so on. And the system can calculate internal reserves to assign to next-stage upkeep of the disposal facilities after the disposal operation. A model of disposal site was designed based on assumption of some preconditions and a study was carried out to make a trial calculation by using the system. Moreover, it will be required to reduce construction cost by rationalizing the facility and to make flat an annual business spending by examining the business schedule. (author)

  14. Developing a Cost Model and Methodology to Estimate Capital Costs for Thermal Energy Storage

    Energy Technology Data Exchange (ETDEWEB)

    Glatzmaier, G.

    2011-12-01

    This report provides an update on the previous cost model for thermal energy storage (TES) systems. The update allows NREL to estimate the costs of such systems that are compatible with the higher operating temperatures associated with advanced power cycles. The goal of the Department of Energy (DOE) Solar Energy Technology Program is to develop solar technologies that can make a significant contribution to the United States domestic energy supply. The recent DOE SunShot Initiative sets a very aggressive cost goal to reach a Levelized Cost of Energy (LCOE) of 6 cents/kWh by 2020 with no incentives or credits for all solar-to-electricity technologies.1 As this goal is reached, the share of utility power generation that is provided by renewable energy sources is expected to increase dramatically. Because Concentrating Solar Power (CSP) is currently the only renewable technology that is capable of integrating cost-effective energy storage, it is positioned to play a key role in providing renewable, dispatchable power to utilities as the share of power generation from renewable sources increases. Because of this role, future CSP plants will likely have as much as 15 hours of Thermal Energy Storage (TES) included in their design and operation. As such, the cost and performance of the TES system is critical to meeting the SunShot goal for solar technologies. The cost of electricity from a CSP plant depends strongly on its overall efficiency, which is a product of two components - the collection and conversion efficiencies. The collection efficiency determines the portion of incident solar energy that is captured as high-temperature thermal energy. The conversion efficiency determines the portion of thermal energy that is converted to electricity. The operating temperature at which the overall efficiency reaches its maximum depends on many factors, including material properties of the CSP plant components. Increasing the operating temperature of the power generation

  15. Collider Scaling and Cost Estimation

    International Nuclear Information System (INIS)

    Palmer, R.B.

    1986-01-01

    This paper deals with collider cost and scaling. The main points of the discussion are the following ones: 1) scaling laws and cost estimation: accelerating gradient requirements, total stored RF energy considerations, peak power consideration, average power consumption; 2) cost optimization; 3) Bremsstrahlung considerations; 4) Focusing optics: conventional, laser focusing or super disruption. 13 refs

  16. Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities

    International Nuclear Information System (INIS)

    Benjamin, Serge; Descures, Sylvain; Du Pasquier, Louis; Francois, Patrice; Buonarotti, Stefano; Mariotti, Giovanni; Tarakonov, Jurij; Daniska, Vladimir; Bergh, Niklas; Carroll, Simon; AaSTRoeM, Annika; Cato, Anna; De La Gardie, Fredrik; Haenggi, Hannes; Rodriguez, Jose; Laird, Alastair; Ridpath, Andy; La Guardia, Thomas; O'Sullivan, Patrick; ); Weber, Inge; )

    2017-01-01

    The cost estimation process of decommissioning nuclear facilities has continued to evolve in recent years, with a general trend towards demonstrating greater levels of detail in the estimate and more explicit consideration of uncertainties, the latter of which may have an impact on decommissioning project costs. The 2012 report on the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, a joint recommendation by the Nuclear Energy Agency (NEA), the International Atomic Energy Agency (IAEA) and the European Commission, proposes a standardised structure of cost items for decommissioning projects that can be used either directly for the production of cost estimates or for mapping of cost items for benchmarking purposes. The ISDC, however, provides only limited guidance on the treatment of uncertainty when preparing cost estimates. Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities, prepared jointly by the NEA and IAEA, is intended to complement the ISDC, assisting cost estimators and reviewers in systematically addressing uncertainties in decommissioning cost estimates. Based on experiences gained in participating countries and projects, the report describes how uncertainty and risks can be analysed and incorporated in decommissioning cost estimates, while presenting the outcomes in a transparent manner

  17. Costs of regulatory compliance: categories and estimating techniques

    International Nuclear Information System (INIS)

    Schulte, S.C.; McDonald, C.L.; Wood, M.T.; Cole, R.M.; Hauschulz, K.

    1978-10-01

    Use of the categorization scheme and cost estimating approaches presented in this report can make cost estimates of regulation required compliance activities of value to policy makers. The report describes a uniform assessment framework that when used would assure that cost studies are generated on an equivalent basis. Such normalization would make comparisons of different compliance activity cost estimates more meaningful, thus enabling the relative merits of different regulatory options to be more effectively judged. The framework establishes uniform cost reporting accounts and cost estimating approaches for use in assessing the costs of complying with regulatory actions. The framework was specifically developed for use in a current study at Pacific Northwest Laboratory. However, use of the procedures for other applications is also appropriate

  18. An Analytical Cost Estimation Procedure

    National Research Council Canada - National Science Library

    Jayachandran, Toke

    1999-01-01

    Analytical procedures that can be used to do a sensitivity analysis of a cost estimate, and to perform tradeoffs to identify input values that can reduce the total cost of a project, are described in the report...

  19. Estimating boiling water reactor decommissioning costs. A user's manual for the BWR Cost Estimating Computer Program (CECP) software: Draft report for comment

    International Nuclear Information System (INIS)

    Bierschbach, M.C.

    1994-12-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the U.S. Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user's manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personal computer, provides estimates for the cost of decommissioning BWR power stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning

  20. Advanced fuel cycle cost estimation model and its cost estimation results for three nuclear fuel cycles using a dynamic model in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sungki, E-mail: sgkim1@kaeri.re.kr [Korea Atomic Energy Research Institute, 1045 Daedeokdaero, Yuseong-gu, Daejeon 305-353 (Korea, Republic of); Ko, Wonil [Korea Atomic Energy Research Institute, 1045 Daedeokdaero, Yuseong-gu, Daejeon 305-353 (Korea, Republic of); Youn, Saerom; Gao, Ruxing [University of Science and Technology, 217 Gajungro, Yuseong-gu, Daejeon 305-350 (Korea, Republic of); Bang, Sungsig, E-mail: ssbang@kaist.ac.kr [Korea Advanced Institute of Science and Technology, Department of Business and Technology Management, 291 Deahak-ro, Yuseong-gu, Daejeon 305-701 (Korea, Republic of)

    2015-11-15

    Highlights: • The nuclear fuel cycle cost using a new cost estimation model was analyzed. • The material flows of three nuclear fuel cycle options were calculated. • The generation cost of once-through was estimated to be 66.88 mills/kW h. • The generation cost of pyro-SFR recycling was estimated to be 78.06 mills/kW h. • The reactor cost was identified as the main cost driver of pyro-SFR recycling. - Abstract: The present study analyzes advanced nuclear fuel cycle cost estimation models such as the different discount rate model and its cost estimation results. To do so, an analysis of the nuclear fuel cycle cost of three options (direct disposal (once through), PWR–MOX (Mixed OXide fuel), and Pyro-SFR (Sodium-cooled Fast Reactor)) from the viewpoint of economic sense, focusing on the cost estimation model, was conducted using a dynamic model. From an analysis of the fuel cycle cost estimation results, it was found that some cost gap exists between the traditional same discount rate model and the advanced different discount rate model. However, this gap does not change the priority of the nuclear fuel cycle option from the viewpoint of economics. In addition, the fuel cycle costs of OT (Once-Through) and Pyro-SFR recycling based on the most likely value using a probabilistic cost estimation except for reactor costs were calculated to be 8.75 mills/kW h and 8.30 mills/kW h, respectively. Namely, the Pyro-SFR recycling option was more economical than the direct disposal option. However, if the reactor cost is considered, the economic sense in the generation cost between the two options (direct disposal vs. Pyro-SFR recycling) can be changed because of the high reactor cost of an SFR.

  1. Parametric Cost Estimates for an International Competitive Edge

    International Nuclear Information System (INIS)

    Murphy, L.T.; Hickey, M.

    2006-01-01

    This paper summarizes the progress to date by CH2M HILL and the UKAEA in development of a parametric modelling capability for estimating the costs of large nuclear decommissioning projects in the United Kingdom (UK) and Europe. The ability to successfully apply parametric cost estimating techniques will be a key factor to commercial success in the UK and European multi-billion dollar waste management, decommissioning and environmental restoration markets. The most useful parametric models will be those that incorporate individual components representing major elements of work: reactor decommissioning, fuel cycle facility decommissioning, waste management facility decommissioning and environmental restoration. Models must be sufficiently robust to estimate indirect costs and overheads, permit pricing analysis and adjustment, and accommodate the intricacies of international monetary exchange, currency fluctuations and contingency. The development of a parametric cost estimating capability is also a key component in building a forward estimating strategy. The forward estimating strategy will enable the preparation of accurate and cost-effective out-year estimates, even when work scope is poorly defined or as yet indeterminate. Preparation of cost estimates for work outside the organizations current sites, for which detailed measurement is not possible and historical cost data does not exist, will also be facilitated. (authors)

  2. [Operating cost analysis of anaesthesia: activity based costing (ABC analysis)].

    Science.gov (United States)

    Majstorović, Branislava M; Kastratović, Dragana A; Vučović, Dragan S; Milaković, Branko D; Miličić, Biljana R

    2011-01-01

    Cost of anaesthesiology represent defined measures to determine a precise profile of expenditure estimation of surgical treatment, which is important regarding planning of healthcare activities, prices and budget. In order to determine the actual value of anaestesiological services, we started with the analysis of activity based costing (ABC) analysis. Retrospectively, in 2005 and 2006, we estimated the direct costs of anestesiological services (salaries, drugs, supplying materials and other: analyses and equipment.) of the Institute of Anaesthesia and Resuscitation of the Clinical Centre of Serbia. The group included all anesthetized patients of both sexes and all ages. We compared direct costs with direct expenditure, "each cost object (service or unit)" of the Republican Healthcare Insurance. The Summary data of the Departments of Anaesthesia documented in the database of the Clinical Centre of Serbia. Numerical data were utilized and the numerical data were estimated and analyzed by computer programs Microsoft Office Excel 2003 and SPSS for Windows. We compared using the linear model of direct costs and unit costs of anaesthesiological services from the Costs List of the Republican Healthcare Insurance. Direct costs showed 40% of costs were spent on salaries, (32% on drugs and supplies, and 28% on other costs, such as analyses and equipment. The correlation of the direct costs of anaestesiological services showed a linear correlation with the unit costs of the Republican Healthcare Insurance. During surgery, costs of anaesthesia would increase by 10% the surgical treatment cost of patients. Regarding the actual costs of drugs and supplies, we do not see any possibility of costs reduction. Fixed elements of direct costs provide the possibility of rationalization of resources in anaesthesia.

  3. Estimation of optimal educational cost per medical student.

    Science.gov (United States)

    Yang, Eunbae B; Lee, Seunghee

    2009-09-01

    This study aims to estimate the optimal educational cost per medical student. A private medical college in Seoul was targeted by the study, and its 2006 learning environment and data from the 2003~2006 budget and settlement were carefully analyzed. Through interviews with 3 medical professors and 2 experts in the economics of education, the study attempted to establish the educational cost estimation model, which yields an empirically computed estimate of the optimal cost per student in medical college. The estimation model was based primarily upon the educational cost which consisted of direct educational costs (47.25%), support costs (36.44%), fixed asset purchases (11.18%) and costs for student affairs (5.14%). These results indicate that the optimal cost per student is approximately 20,367,000 won each semester; thus, training a doctor costs 162,936,000 won over 4 years. Consequently, we inferred that the tuition levels of a local medical college or professional medical graduate school cover one quarter or one-half of the per- student cost. The findings of this study do not necessarily imply an increase in medical college tuition; the estimation of the per-student cost for training to be a doctor is one matter, and the issue of who should bear this burden is another. For further study, we should consider the college type and its location for general application of the estimation method, in addition to living expenses and opportunity costs.

  4. Methodology to estimate the cost of the severe accidents risk / maximum benefit

    International Nuclear Information System (INIS)

    Mendoza, G.; Flores, R. M.; Vega, E.

    2016-09-01

    For programs and activities to manage aging effects, any changes to plant operations, inspections, maintenance activities, systems and administrative control procedures during the renewal period should be characterized, designed to manage the effects of aging as required by 10 Cfr Part 54 that could impact the environment. Environmental impacts significantly different from those described in the final environmental statement for the current operating license should be described in detail. When complying with the requirements of a license renewal application, the Severe Accident Mitigation Alternatives (SAMA) analysis is contained in a supplement to the environmental report of the plant that meets the requirements of 10 Cfr Part 51. In this paper, the methodology for estimating the cost of severe accidents risk is established and discussed, which is then used to identify and select the alternatives for severe accident mitigation, which are analyzed to estimate the maximum benefit that an alternative could achieve if this eliminate all risk. Using the regulatory analysis techniques of the US Nuclear Regulatory Commission (NRC) estimates the cost of severe accidents risk. The ultimate goal of implementing the methodology is to identify candidates for SAMA that have the potential to reduce the severe accidents risk and determine if the implementation of each candidate is cost-effective. (Author)

  5. The blind man in a dark room with an elephant : estimating O and M costs post warranty

    Energy Technology Data Exchange (ETDEWEB)

    Chant, A. [Ortech International, Mississauga, ON (Canada)

    2010-07-01

    Operating and maintenance (O and M) costs are the direct costs affecting turbine operations, and are a measure of the operating efficiency of a wind power facility. A combined shortfall in production and an unplanned increase in O and M costs can produce a negative rate of return. Studies have shown that many wind power facilities overestimate their revenue by approximately 10 percent due to inaccuracies in energy output forecasts, grid curtailment issues, and mechanical failures. In order to accurately forecast O and M costs, operators must consider routine and planned maintenance, preventative maintenance, and unplanned and access maintenance activities. Reductions in scheduled maintenance can lead to higher unplanned and reactive maintenance costs. This PowerPoint presentation outlined the potential savings and expenses involved in the maintenance of a wind power plant. The high cost of reactive maintenance costs were compared with the costs associated with scheduled and planned maintenance. Gross savings for a typical wind power plant were estimated at $212,711 per year. Net lifetime savings over a 20-year period were estimated at $25,807,000. The current status of the O and M servicing market was reviewed, and the potential effects of larger and unproven new wind turbines were discussed. tabs., figs.

  6. Residential outage cost estimation: Hong Kong

    International Nuclear Information System (INIS)

    Woo, C.K.; Ho, T.; Shiu, A.; Cheng, Y.S.; Horowitz, I.; Wang, J.

    2014-01-01

    Hong Kong has almost perfect electricity reliability, the result of substantial investments ultimately financed by electricity consumers who may be willing to accept lower reliability in exchange for lower bills. But consumers with high outage costs are likely to reject the reliability reduction. Our ordered-logit regression analysis of the responses by 1876 households to a telephone survey conducted in June 2013 indicates that Hong Kong residents exhibit a statistically-significant preference for their existing service reliability and rate. Moreover, the average residential cost estimate for a 1-h outage is US$45 (HK$350), topping the estimates reported in 10 of the 11 studies published in the last 10 years. The policy implication is that absent additional compelling evidence, Hong Kong should not reduce its service reliability. - Highlights: • Use a contingent valuation survey to obtain residential preferences for reliability. • Use an ordered logit analysis to estimate Hong Kong's residential outage costs. • Find high outage cost estimates that imply high reliability requirements. • Conclude that sans new evidence, Hong Kong should not reduce its reliability

  7. Advanced Composite Air Frame Life Cycle Cost Estimating

    Science.gov (United States)

    2014-06-19

    the ACCA based on the cost . This cost analysis takes into account the increased performance parameters of the new airframe structure. This research...20 Advanced Composite Cargo Aircraft ( ACCA ) ..........................................................23 viii Cost Estimation...establishing the procurement strategies and life cycle cost (LCC) model cost estimations. The current LCC models do not take into account the potential cost

  8. Consumer-Operated Service Programs: monetary and donated costs and cost-effectiveness.

    Science.gov (United States)

    Yates, Brian T; Mannix, Danyelle; Freed, Michael C; Campbell, Jean; Johnsen, Matthew; Jones, Kristine; Blyler, Crystal R

    2011-01-01

    Examine cost differences between Consumer Operated Service Programs (COSPs) as possibly determined by a) size of program, b) use of volunteers and other donated resources, c) cost-of-living differences between program locales, d) COSP model applied, and e) delivery system used to implement the COSP model. As part of a larger evaluation of COSP, data on operating costs, enrollments, and mobilization of donated resources were collected for eight programs representing three COSP models (drop-in centers, mutual support, and education/advocacy training). Because the 8 programs were operated in geographically diverse areas of the US, costs were examined with and without adjustment for differences in local cost of living. Because some COSPs use volunteers and other donated resources, costs were measured with and without these resources being monetized. Scale of operation also was considered as a mediating variable for differences in program costs. Cost per visit, cost per consumer per quarter, and total program cost were calculated separately for funds spent and for resources donated for each COSP. Differences between COSPs in cost per consumer and cost per visit seem better explained by economies of scale and delivery system used than by cost-of-living differences between program locations or COSP model. Given others' findings that different COSP models produce little variation in service effectiveness, minimize service costs by maximizing scale of operation while using a delivery system that allows staff and facilities resources to be increased or decreased quickly to match number of consumers seeking services.

  9. An integrated model for estimating energy cost of a tidal current turbine farm

    International Nuclear Information System (INIS)

    Li, Ye; Lence, Barbara J.; Calisal, Sander M.

    2011-01-01

    A tidal current turbine is a device for harnessing energy from tidal currents and functions in a manner similar to a wind turbine. A tidal current turbine farm consists of a group of tidal current turbines distributed in a site where high-speed current is available. The accurate prediction of energy cost of a tidal current turbine farm is important to the justification of planning and constructing such a farm. However, the existing approaches used to predict energy cost of tidal current turbine farms oversimplify the hydrodynamic interactions between turbines in energy prediction and oversimplify the operation and maintenance strategies involved in cost estimation as well as related fees. In this paper, we develop a model, which integrates a marine hydrodynamic model with high accuracy for predicting energy output and a comprehensive cost-effective operation and maintenance model for estimating the cost that may be incurred in producing the energy, to predict energy cost from a tidal current turbine farm. This model is expected to be able to simulate more complicated cases and generate more accurate results than existing models. As there is no real tidal current turbine farm, we validate this model with offshore wind studies. Finally, case studies about Vancouver are conducted with a scenario-based analysis. We minimize the energy cost by minimizing the total cost and maximizing the total power output under constraints related to the local conditions (e.g., geological and labor information) and the turbine specifications. The results suggest that tidal current energy is about ready to penetrate the electricity market in some major cities in North America if learning curve for the operational and maintenance is minimum. (author)

  10. Establishing a cost model when estimating product cost in early design phases

    OpenAIRE

    Jeppsson, Johanna; Sjöberg, Jessica

    2017-01-01

    About 75% of the total product cost is determined in the early design phase, which means that the possibilities to affect costs are relatively small when the design phase is completed. For companies, it is therefore vital to conduct reliable cost estimates in the early design phase, when selecting between different design choices. When conducting a cost estimate there are many uncertainties. The aim with this study is therefore to explore how uncertainties regarding product cost can be consid...

  11. Estimating the costs of tsetse control options: an example for Uganda.

    Science.gov (United States)

    Shaw, A P M; Torr, S J; Waiswa, C; Cecchi, G; Wint, G R W; Mattioli, R C; Robinson, T P

    2013-07-01

    Decision-making and financial planning for tsetse control is complex, with a particularly wide range of choices to be made on location, timing, strategy and methods. This paper presents full cost estimates for eliminating or continuously controlling tsetse in a hypothetical area of 10,000km(2) located in south-eastern Uganda. Four tsetse control techniques were analysed: (i) artificial baits (insecticide-treated traps/targets), (ii) insecticide-treated cattle (ITC), (iii) aerial spraying using the sequential aerosol technique (SAT) and (iv) the addition of the sterile insect technique (SIT) to the insecticide-based methods (i-iii). For the creation of fly-free zones and using a 10% discount rate, the field costs per km(2) came to US$283 for traps (4 traps per km(2)), US$30 for ITC (5 treated cattle per km(2) using restricted application), US$380 for SAT and US$758 for adding SIT. The inclusion of entomological and other preliminary studies plus administrative overheads adds substantially to the overall cost, so that the total costs become US$482 for traps, US$220 for ITC, US$552 for SAT and US$993 - 1365 if SIT is added following suppression using another method. These basic costs would apply to trouble-free operations dealing with isolated tsetse populations. Estimates were also made for non-isolated populations, allowing for a barrier covering 10% of the intervention area, maintained for 3 years. Where traps were used as a barrier, the total cost of elimination increased by between 29% and 57% and for ITC barriers the increase was between 12% and 30%. In the case of continuous tsetse control operations, costs were estimated over a 20-year period and discounted at 10%. Total costs per km(2) came to US$368 for ITC, US$2114 for traps, all deployed continuously, and US$2442 for SAT applied at 3-year intervals. The lower costs compared favourably with the regular treatment of cattle with prophylactic trypanocides (US$3862 per km(2) assuming four doses per annum at 45

  12. Operating cost model for local service airlines

    Science.gov (United States)

    Anderson, J. L.; Andrastek, D. A.

    1976-01-01

    Several mathematical models now exist which determine the operating economics for a United States trunk airline. These models are valuable in assessing the impact of new aircraft into an airline's fleet. The use of a trunk airline cost model for the local service airline does not result in representative operating costs. A new model is presented which is representative of the operating conditions and resultant costs for the local service airline. The calculated annual direct and indirect operating costs for two multiequipment airlines are compared with their actual operating experience.

  13. Optimizing power plant cycling operations while reducing generating plant damage and costs

    Energy Technology Data Exchange (ETDEWEB)

    Lefton, S A; Besuner, P H; Grimsrud, P [Aptech Engineering Services, Inc., Sunnyvale, CA (United States); Bissel, A [Electric Supply Board, Dublin (Ireland)

    1999-12-31

    This presentation describes a method for analyzing, quantifying, and minimizing the total cost of fossil, combined cycle, and pumped hydro power plant cycling operation. The method has been developed, refined, and applied during engineering studies at some 160 units in the United States and 8 units at the Irish Electric Supply Board (ESB) generating system. The basic premise of these studies was that utilities are underestimating the cost of cycling operation. The studies showed that the cost of cycling conventional boiler/turbine fossil power plants can range from between $2,500 and $500,000 per start-stop cycle. It was found that utilities typically estimate these costs by factors of 3 to 30 below actual costs and, thus, often significantly underestimate their true cycling costs. Knowledge of the actual, or total, cost of cycling will reduce power production costs by enabling utilities to more accurately dispatch their units to manage unit life expectancies, maintenance strategies and reliability. Utility management responses to these costs are presented and utility cost savings have been demonstrated. (orig.) 7 refs.

  14. Optimizing power plant cycling operations while reducing generating plant damage and costs

    Energy Technology Data Exchange (ETDEWEB)

    Lefton, S.A.; Besuner, P.H.; Grimsrud, P. [Aptech Engineering Services, Inc., Sunnyvale, CA (United States); Bissel, A. [Electric Supply Board, Dublin (Ireland)

    1998-12-31

    This presentation describes a method for analyzing, quantifying, and minimizing the total cost of fossil, combined cycle, and pumped hydro power plant cycling operation. The method has been developed, refined, and applied during engineering studies at some 160 units in the United States and 8 units at the Irish Electric Supply Board (ESB) generating system. The basic premise of these studies was that utilities are underestimating the cost of cycling operation. The studies showed that the cost of cycling conventional boiler/turbine fossil power plants can range from between $2,500 and $500,000 per start-stop cycle. It was found that utilities typically estimate these costs by factors of 3 to 30 below actual costs and, thus, often significantly underestimate their true cycling costs. Knowledge of the actual, or total, cost of cycling will reduce power production costs by enabling utilities to more accurately dispatch their units to manage unit life expectancies, maintenance strategies and reliability. Utility management responses to these costs are presented and utility cost savings have been demonstrated. (orig.) 7 refs.

  15. Guidelines for estimating nuclear power plant decommissioning costs

    International Nuclear Information System (INIS)

    LaGuardia, T.S.; Williams, D.H.

    1989-01-01

    The objectives of the study were: (1) To develop guidelines to facilitate estimating the cost of nuclear power plant decommissioning alternatives on a plant-specific basis and to facilitate comparing estimates made by others. The guidelines are expressed in a form that could be readily adapted by technical specialists from individual utilities or by other uses. (2) To enhance the industry's credibility with decision-makes at the state and federal levels during rate/regulatory processes involving decommissioning costs. This is accomplished by providing a detailed, systematic breakdown of how decommissioning cost estimates are prepared. (3) To increase the validity, realism, and accuracy of site-specific decommissioning cost estimates. This is accomplished by pulling together the experiences and practices of several nuclear utilities and consultants in conducting past decommissioning cost estimates

  16. An analysis of nuclear power plant operating costs

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents the results of a statistical analysis of nonfuel operating costs for nuclear power plants. Most studies of the economic costs of nuclear power have focused on the rapid escalation in the cost of constructing a nuclear power plant. The present analysis found that there has also been substantial escalation in real (inflation-adjusted) nonfuel operating costs. It is important to determine the factors contributing to the escalation in operating costs, not only to understand what has occurred but also to gain insights about future trends in operating costs. There are two types of nonfuel operating costs. The first is routine operating and maintenance expenditures (O and M costs), and the second is large postoperational capital expenditures, or what is typically called ''capital additions.'' O and M costs consist mainly of expenditures on labor, and according to one recently completed study, the majoriy of employees at a nuclear power plant perform maintenance activities. It is generally thought that capital additions costs consist of large maintenance expenditures needed to keep the plants operational, and to make plant modifications (backfits) required by the Nuclear Regulatory Commission (NRC). Many discussions of nuclear power plant operating costs have not considered these capital additions costs, and a major finding of the present study is that these costs are substantial. The objective of this study was to determine why nonfuel operating costs have increased over the past decade. The statistical analysis examined a number of factors that have influenced the escalation in real nonfuel operating costs and these are discussed in this report. 4 figs, 19 tabs

  17. Cost analysis and estimating tools and techniques

    CERN Document Server

    Nussbaum, Daniel

    1990-01-01

    Changes in production processes reflect the technological advances permeat­ ing our products and services. U. S. industry is modernizing and automating. In parallel, direct labor is fading as the primary cost driver while engineering and technology related cost elements loom ever larger. Traditional, labor-based ap­ proaches to estimating costs are losing their relevance. Old methods require aug­ mentation with new estimating tools and techniques that capture the emerging environment. This volume represents one of many responses to this challenge by the cost analysis profession. The Institute of Cost Analysis (lCA) is dedicated to improving the effective­ ness of cost and price analysis and enhancing the professional competence of its members. We encourage and promote exchange of research findings and appli­ cations between the academic community and cost professionals in industry and government. The 1990 National Meeting in Los Angeles, jointly spo~sored by ICA and the National Estimating Society (NES),...

  18. The cost of Alzheimer's disease in China and re-estimation of costs worldwide.

    Science.gov (United States)

    Jia, Jianping; Wei, Cuibai; Chen, Shuoqi; Li, Fangyu; Tang, Yi; Qin, Wei; Zhao, Lina; Jin, Hongmei; Xu, Hui; Wang, Fen; Zhou, Aihong; Zuo, Xiumei; Wu, Liyong; Han, Ying; Han, Yue; Huang, Liyuan; Wang, Qi; Li, Dan; Chu, Changbiao; Shi, Lu; Gong, Min; Du, Yifeng; Zhang, Jiewen; Zhang, Junjian; Zhou, Chunkui; Lv, Jihui; Lv, Yang; Xie, Haiqun; Ji, Yong; Li, Fang; Yu, Enyan; Luo, Benyan; Wang, Yanjiang; Yang, Shanshan; Qu, Qiumin; Guo, Qihao; Liang, Furu; Zhang, Jintao; Tan, Lan; Shen, Lu; Zhang, Kunnan; Zhang, Jinbiao; Peng, Dantao; Tang, Muni; Lv, Peiyuan; Fang, Boyan; Chu, Lan; Jia, Longfei; Gauthier, Serge

    2018-04-01

    The socioeconomic costs of Alzheimer's disease (AD) in China and its impact on global economic burden remain uncertain. We collected data from 3098 patients with AD in 81 representative centers across China and estimated AD costs for individual patient and total patients in China in 2015. Based on this data, we re-estimated the worldwide costs of AD. The annual socioeconomic cost per patient was US $19,144.36, and total costs were US $167.74 billion in 2015. The annual total costs are predicted to reach US $507.49 billion in 2030 and US $1.89 trillion in 2050. Based on our results, the global estimates of costs for dementia were US $957.56 billion in 2015, and will be US $2.54 trillion in 2030, and US $9.12 trillion in 2050, much more than the predictions by the World Alzheimer Report 2015. China bears a heavy burden of AD costs, which greatly change the estimates of AD cost worldwide. Copyright © 2017 the Alzheimer's Association. Published by Elsevier Inc. All rights reserved.

  19. Estimating the costs of human space exploration

    Science.gov (United States)

    Mandell, Humboldt C., Jr.

    1994-01-01

    The plan for NASA's new exploration initiative has the following strategic themes: (1) incremental, logical evolutionary development; (2) economic viability; and (3) excellence in management. The cost estimation process is involved with all of these themes and they are completely dependent upon the engineering cost estimator for success. The purpose is to articulate the issues associated with beginning this major new government initiative, to show how NASA intends to resolve them, and finally to demonstrate the vital importance of a leadership role by the cost estimation community.

  20. Lead coolant test facility systems design, thermal hydraulic analysis and cost estimate

    Energy Technology Data Exchange (ETDEWEB)

    Khericha, Soli, E-mail: slk2@inel.gov [Battelle Energy Alliance, LLC, Idaho National Laboratory, Idaho Falls, ID 83415 (United States); Harvego, Edwin; Svoboda, John; Evans, Robert [Battelle Energy Alliance, LLC, Idaho National Laboratory, Idaho Falls, ID 83415 (United States); Dalling, Ryan [ExxonMobil Gas and Power Marketing, Houston, TX 77069 (United States)

    2012-01-15

    The Idaho National Laboratory prepared a preliminary technical and functional requirements (T and FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic coolant. Based on review of current world lead or lead-bismuth test facilities and research needs listed in the Generation IV Roadmap, five broad areas of requirements were identified as listed below: Bullet Develop and demonstrate feasibility of submerged heat exchanger. Bullet Develop and demonstrate open-lattice flow in electrically heated core. Bullet Develop and demonstrate chemistry control. Bullet Demonstrate safe operation. Bullet Provision for future testing. This paper discusses the preliminary design of systems, thermal hydraulic analysis, and simplified cost estimated. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 4200 Degree-Sign C. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M (in 2006 $). It is also estimated that the facility will require two years to be constructed and ready for operation.

  1. Handbook for cost estimating. A method for developing estimates of costs for generic actions for nuclear power plants

    International Nuclear Information System (INIS)

    Ball, J.R.; Cohen, S.; Ziegler, E.Z.

    1984-10-01

    This document provides overall guidance to assist the NRC in preparing the types of cost estimates required by the Regulatory Analysis Guidelines and to assist in the assignment of priorities in resolving generic safety issues. The Handbook presents an overall cost model that allows the cost analyst to develop a chronological series of activities needed to implement a specific regulatory requirement throughout all applicable commercial LWR power plants and to identify the significant cost elements for each activity. References to available cost data are provided along with rules of thumb and cost factors to assist in evaluating each cost element. A suitable code-of-accounts data base is presented to assist in organizing and aggregating costs. Rudimentary cost analysis methods are described to allow the analyst to produce a constant-dollar, lifetime cost for the requirement. A step-by-step example cost estimate is included to demonstrate the overall use of the Handbook

  2. Nuclear shipping and waste disposal cost estimates

    International Nuclear Information System (INIS)

    Hudson, C.R. II.

    1977-11-01

    Cost estimates for the shipping of spent fuel from the reactor, shipping of waste from the reprocessing plant, and disposal of reprocessing plant wastes have been made for five reactor types. The reactors considered are the light-water reactor (LWR), the mixed-oxide-fueled light-water reactor (MOX), the Canadian deuterium-uranium reactor (CANDU), the fast breeder reactor (FBR), and the high-temperature gas-cooled reactor (HTGR). In addition to the cost estimates, this report provides details on the bases and assumptions used to develop the cost estimates

  3. Increased accuracy of cost-estimation using product configuration systems

    DEFF Research Database (Denmark)

    Rasmussen, Jeppe Bredahl; Hvam, Lars; Mortensen, Niels Henrik

    This article describes an approach for utilizing Product Configuration Systems (PCS) for quantifying project costs in project-based companies. It presents a case study demonstrating a method of quantifying costs in a way that makes it possible to configure cost- and time estimates. Piecework costs......, material costs and sub-supplier costs are used as principle cost elements and linked to structural and process elements to facilitate configuration. The cost data are used by the PCS to generate fast and accurate cost-estimates, quotations, time estimates and cost summaries. The described cost...... quantification principles have been used in a Scandinavian SME (Small and Medium-sized Enterprise) since the 90’s, but have since 2011 been adopted to be used in a configuration system. A longitudinal case study was conducted to compare cost and time-estimation accuracy before and after implementation. We...

  4. Selection of relevant items for decommissioning costing estimation of a PWR using fuzzy logic

    International Nuclear Information System (INIS)

    Monteiro, Deiglys Borges; Busse, Alexander Lucas; Moreira, Joao M.L.; Maiorino, Jose Rubens

    2015-01-01

    The decommissioning is an important part of a nuclear power plant life cycle which may occur by technical, economical or safety reasons. Decommissioning requires carrying out a large number of tasks that should be planned in advance, involves cost evaluations, preparation of plans of activity and actual operational actions. Despite the large number of tasks, only part of them is relevant for cost estimation purpose. The technical literature and international regulatory agencies suggest a variety of methods for decommissioning cost estimation. Most of them require a very detailed knowledge of the plant and data available suitable for plants that are starting their decommissioning but not for those in the planning stage. The present work aims to apply fuzzy logic to sort out relevant items to cost estimation in order to reduce the work effort involved. The scheme uses parametric equations for specific cost items, and is applied to specific parts of the process of nuclear power plant decommissioning. (author)

  5. Selection of relevant items for decommissioning costing estimation of a PWR using fuzzy logic

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Deiglys Borges; Busse, Alexander Lucas; Moreira, Joao M.L.; Maiorino, Jose Rubens, E-mail: deiglys.monteiro@ufabc.edu.br, E-mail: alexlucasb@gmail.com, E-mail: joao.moreira@ufabc.edu.br, E-mail: joserubens.maiorino@ufabc.edu.br [Universidade Federal do ABC (CECS/UFABC), Santo Andre, SP (Brazil). Centro de Engenharia, Modelagem e Ciencias Aplicadas. Programa de Pos-Graduacao em Energia e Engenharia da Energia

    2015-07-01

    The decommissioning is an important part of a nuclear power plant life cycle which may occur by technical, economical or safety reasons. Decommissioning requires carrying out a large number of tasks that should be planned in advance, involves cost evaluations, preparation of plans of activity and actual operational actions. Despite the large number of tasks, only part of them is relevant for cost estimation purpose. The technical literature and international regulatory agencies suggest a variety of methods for decommissioning cost estimation. Most of them require a very detailed knowledge of the plant and data available suitable for plants that are starting their decommissioning but not for those in the planning stage. The present work aims to apply fuzzy logic to sort out relevant items to cost estimation in order to reduce the work effort involved. The scheme uses parametric equations for specific cost items, and is applied to specific parts of the process of nuclear power plant decommissioning. (author)

  6. The cost of trauma operating theatre inefficiency.

    Science.gov (United States)

    Ang, W W; Sabharwal, S; Johannsson, H; Bhattacharya, R; Gupte, C M

    2016-05-01

    The National Health Service (NHS) is currently facing a financial crisis with a projected deficit of £2billion by the end of financial year 2015/16. As operating rooms (OR) are one of the costliest components in secondary care, improving theatre efficiency should be at the forefront of efforts to improve health service efficiency. The objectives of this study were to characterize the causes of trauma OR delays and to estimate the cost of this inefficiency. A 1-month prospective single-centre study in St. Mary's Hospital. Turnaround time (TT) was used as the surrogate parameter to measure theatre efficiency. Factors including patient age, ASA score and presence of surgical and anaesthetic consultant were evaluated to identify positive or negative associations with theatre delays. Inefficiency cost was calculated by multiplying the time wasted with staff capacity costs and opportunity costs, found to be £24.77/minute. The commonest causes for increased TT were delays in sending for patients (50%) and problems with patient transport to the OR (31%). 461 min of delay was observed in 12 days, equivalent to loss of £951.58/theatre/day. Non-statistically significant trends were seen between length of delays and advancing patient age, ASA score and absence of either a senior clinician or an anaesthetic consultant. Interestingly, the trend was not as strong for absence of an anaesthetic consultant. This study found delays in operating TT to represent a sizable cost, with potential efficiency savings based on TT of £347,327/theatre/year. Further study of a larger sample is warranted to better evaluate the identified trends.

  7. Econometric estimation of country-specific hospital costs

    Directory of Open Access Journals (Sweden)

    Murray Christopher JL

    2003-02-01

    Full Text Available Abstract Information on the unit cost of inpatient and outpatient care is an essential element for costing, budgeting and economic-evaluation exercises. Many countries lack reliable estimates, however. WHO has recently undertaken an extensive effort to collect and collate data on the unit cost of hospitals and health centres from as many countries as possible; so far, data have been assembled from 49 countries, for various years during the period 1973–2000. The database covers a total of 2173 country-years of observations. Large gaps remain, however, particularly for developing countries. Although the long-term solution is that all countries perform their own costing studies, the question arises whether it is possible to predict unit costs for different countries in a standardized way for short-term use. The purpose of the work described in this paper, a modelling exercise, was to use the data collected across countries to predict unit costs in countries for which data are not yet available, with the appropriate uncertainty intervals. The model presented here forms part of a series of models used to estimate unit costs for the WHO-CHOICE project. The methods and the results of the model, however, may be used to predict a number of different types of country-specific unit costs, depending on the purpose of the exercise. They may be used, for instance, to estimate the costs per bed-day at different capacity levels; the "hotel" component of cost per bed-day; or unit costs net of particular components such as drugs. In addition to reporting estimates for selected countries, the paper shows that unit costs of hospitals vary within countries, sometimes by an order of magnitude. Basing cost-effectiveness studies or budgeting exercises on the results of a study of a single facility, or even a small group of facilities, is likely to be misleading.

  8. Revised cost savings estimate with uncertainty for enhanced sludge washing of underground storage tank waste

    International Nuclear Information System (INIS)

    DeMuth, S.

    1998-01-01

    Enhanced Sludge Washing (ESW) has been selected to reduce the amount of sludge-based underground storage tank (UST) high-level waste at the Hanford site. During the past several years, studies have been conducted to determine the cost savings derived from the implementation of ESW. The tank waste inventory and ESW performance continues to be revised as characterization and development efforts advance. This study provides a new cost savings estimate based upon the most recent inventory and ESW performance revisions, and includes an estimate of the associated cost uncertainty. Whereas the author's previous cost savings estimates for ESW were compared against no sludge washing, this study assumes the baseline to be simple water washing which more accurately reflects the retrieval activity along. The revised ESW cost savings estimate for all UST waste at Hanford is $6.1 B ± $1.3 B within 95% confidence. This is based upon capital and operating cost savings, but does not include development costs. The development costs are assumed negligible since they should be at least an order of magnitude less than the savings. The overall cost savings uncertainty was derived from process performance uncertainties and baseline remediation cost uncertainties, as determined by the author's engineering judgment

  9. Cost Engineering Techniques and Their Applicability for Cost Estimation of Organic Rankine Cycle Systems

    Directory of Open Access Journals (Sweden)

    Sanne Lemmens

    2016-06-01

    Full Text Available The potential of organic Rankine cycle (ORC systems is acknowledged by both considerable research and development efforts and an increasing number of applications. Most research aims at improving ORC systems through technical performance optimization of various cycle architectures and working fluids. The assessment and optimization of technical feasibility is at the core of ORC development. Nonetheless, economic feasibility is often decisive when it comes down to considering practical instalments, and therefore an increasing number of publications include an estimate of the costs of the designed ORC system. Various methods are used to estimate ORC costs but the resulting values are rarely discussed with respect to accuracy and validity. The aim of this paper is to provide insight into the methods used to estimate these costs and open the discussion about the interpretation of these results. A review of cost engineering practices shows there has been a long tradition of industrial cost estimation. Several techniques have been developed, but the expected accuracy range of the best techniques used in research varies between 10% and 30%. The quality of the estimates could be improved by establishing up-to-date correlations for the ORC industry in particular. Secondly, the rapidly growing ORC cost literature is briefly reviewed. A graph summarizing the estimated ORC investment costs displays a pattern of decreasing costs for increasing power output. Knowledge on the actual costs of real ORC modules and projects remains scarce. Finally, the investment costs of a known heat recovery ORC system are discussed and the methodologies and accuracies of several approaches are demonstrated using this case as benchmark. The best results are obtained with factorial estimation techniques such as the module costing technique, but the accuracies may diverge by up to +30%. Development of correlations and multiplication factors for ORC technology in particular is

  10. Development of computer program for estimating decommissioning cost - 59037

    International Nuclear Information System (INIS)

    Kim, Hak-Soo; Park, Jong-Kil

    2012-01-01

    The programs for estimating the decommissioning cost have been developed for many different purposes and applications. The estimation of decommissioning cost is required a large amount of data such as unit cost factors, plant area and its inventory, waste treatment, etc. These make it difficult to use manual calculation or typical spreadsheet software such as Microsoft Excel. The cost estimation for eventual decommissioning of nuclear power plants is a prerequisite for safe, timely and cost-effective decommissioning. To estimate the decommissioning cost more accurately and systematically, KHNP, Korea Hydro and Nuclear Power Co. Ltd, developed a decommissioning cost estimating computer program called 'DeCAT-Pro', which is Decommission-ing Cost Assessment Tool - Professional. (Hereinafter called 'DeCAT') This program allows users to easily assess the decommissioning cost with various decommissioning options. Also, this program provides detailed reporting for decommissioning funding requirements as well as providing detail project schedules, cash-flow, staffing plan and levels, and waste volumes by waste classifications and types. KHNP is planning to implement functions for estimating the plant inventory using 3-D technology and for classifying the conditions of radwaste disposal and transportation automatically. (authors)

  11. Streamlining: Reducing costs and increasing STS operations effectiveness

    Science.gov (United States)

    Petersburg, R. K.

    1985-01-01

    The development of streamlining as a concept, its inclusion in the space transportation system engineering and operations support (STSEOS) contract, and how it serves as an incentive to management and technical support personnel is discussed. The mechanics of encouraging and processing streamlining suggestions, reviews, feedback to submitters, recognition, and how individual employee performance evaluations are used to motivation are discussed. Several items that were implemented are mentioned. Information reported and the methodology of determining estimated dollar savings are outlined. The overall effect of this activity on the ability of the McDonnell Douglas flight preparation and mission operations team to support a rapidly increasing flight rate without a proportional increase in cost is illustrated.

  12. COSTMODL - AN AUTOMATED SOFTWARE DEVELOPMENT COST ESTIMATION TOOL

    Science.gov (United States)

    Roush, G. B.

    1994-01-01

    The cost of developing computer software consumes an increasing portion of many organizations' budgets. As this trend continues, the capability to estimate the effort and schedule required to develop a candidate software product becomes increasingly important. COSTMODL is an automated software development estimation tool which fulfills this need. Assimilating COSTMODL to any organization's particular environment can yield significant reduction in the risk of cost overruns and failed projects. This user-customization capability is unmatched by any other available estimation tool. COSTMODL accepts a description of a software product to be developed and computes estimates of the effort required to produce it, the calendar schedule required, and the distribution of effort and staffing as a function of the defined set of development life-cycle phases. This is accomplished by the five cost estimation algorithms incorporated into COSTMODL: the NASA-developed KISS model; the Basic, Intermediate, and Ada COCOMO models; and the Incremental Development model. This choice affords the user the ability to handle project complexities ranging from small, relatively simple projects to very large projects. Unique to COSTMODL is the ability to redefine the life-cycle phases of development and the capability to display a graphic representation of the optimum organizational structure required to develop the subject project, along with required staffing levels and skills. The program is menu-driven and mouse sensitive with an extensive context-sensitive help system that makes it possible for a new user to easily install and operate the program and to learn the fundamentals of cost estimation without having prior training or separate documentation. The implementation of these functions, along with the customization feature, into one program makes COSTMODL unique within the industry. COSTMODL was written for IBM PC compatibles, and it requires Turbo Pascal 5.0 or later and Turbo

  13. Preliminary estimates of cost savings for defense high level waste vitrification options

    International Nuclear Information System (INIS)

    Merrill, R.A.; Chapman, C.C.

    1993-09-01

    The potential for realizing cost savings in the disposal of defense high-level waste through process and design modificatins has been considered. Proposed modifications range from simple changes in the canister design to development of an advanced melter capable of processing glass with a higher waste loading. Preliminary calculations estimate the total disposal cost (not including capital or operating costs) for defense high-level waste to be about $7.9 billion dollars for the reference conditions described in this paper, while projected savings resulting from the proposed process and design changes could reduce the disposal cost of defense high-level waste by up to $5.2 billion

  14. Estimation of costs for applications of remediation technologies for the Department of Energy's Programmatic Environmental Impact Statement

    International Nuclear Information System (INIS)

    Villegas, A.J.; Hansen, R.I.; Humphreys, K.K.; Paananen, J.M.; Gildea, L.F.

    1994-01-01

    The Programmatic Environmental impact Statement (PEIS) being developed by the US Department of Energy (DOE) for environmental restoration (ER) and waste management (WM) activities expected to be carried out across the DOE's nationwide complex of facilities is assessing the impacts of removing, transporting, treating, storing, and disposing of waste from these ER and WM activities. Factors being considered include health and safety impacts to the public and to workers, impacts on the environment, costs and socio-economic impacts, and near-term and residual risk during those ER and WM operations. The purpose of this paper is to discuss the methodology developed specifically for the PEIS to estimate costs associated with the deployment and application of individual remediation technologies. These individual costs are used in developing order-of-magnitude cost estimates for the total remediation activities. Costs are developed on a per-unit-of-material-to-be-treated basis (i.e., $/m 3 ) to accommodate remediation projects of varying sizes. The primary focus of this cost-estimating effort was the development of capital and operating unit cost factors based on the amount of primary media to be removed, handled, and treated. The unit costs for individual treatment technologies were developed using information from a variety of sources, mainly from periodicals, EPA documentation, handbooks, vendor contacts, and cost models. The unit cost factors for individual technologies were adjusted to 1991 dollars

  15. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  16. Cost Estimating Cases: Educational Tools for Cost Analysts

    Science.gov (United States)

    1993-09-01

    only appropriate documentation should be provided. In other words, students should not submit all of the documentation possible using ACEIT , only that...case was their lack of understanding of the ACEIT software used to conduct the estimate. Specifically, many students misinterpreted the cost...estimating relationships (CERs) embedded in the 49 software. Additionally, few of the students were able to properly organize the ACEIT documentation output

  17. State-Level Estimates of Cancer-Related Absenteeism Costs

    Science.gov (United States)

    Tangka, Florence K.; Trogdon, Justin G.; Nwaise, Isaac; Ekwueme, Donatus U.; Guy, Gery P.; Orenstein, Diane

    2016-01-01

    Background Cancer is one of the top five most costly diseases in the United States and leads to substantial work loss. Nevertheless, limited state-level estimates of cancer absenteeism costs have been published. Methods In analyses of data from the 2004–2008 Medical Expenditure Panel Survey, the 2004 National Nursing Home Survey, the U.S. Census Bureau for 2008, and the 2009 Current Population Survey, we used regression modeling to estimate annual state-level absenteeism costs attributable to cancer from 2004 to 2008. Results We estimated that the state-level median number of days of absenteeism per year among employed cancer patients was 6.1 days and that annual state-level cancer absenteeism costs ranged from $14.9 million to $915.9 million (median = $115.9 million) across states in 2010 dollars. Absenteeism costs are approximately 6.5% of the costs of premature cancer mortality. Conclusions The results from this study suggest that lost productivity attributable to cancer is a substantial cost to employees and employers and contributes to estimates of the overall impact of cancer in a state population. PMID:23969498

  18. Nuclear operating costs are rising exponentially - official

    International Nuclear Information System (INIS)

    Thomas, S.

    1988-01-01

    The Energy Information Agency of the United States Department of Energy has collected data on the operations of nuclear power plants in the United States. A statistical regression analysis was made of this data base. This shows that the escalation in annual, real non-fuel operating costs is such that the operating cost savings made by closing down an old nuclear plant would be sufficient to pay the capital and operating costs of replacing it with a brand new coal-fired plant. The main reason for the increasing operating and maintenance costs is the cost of replacement power i.e. the higher the economic penalty of plant breakdown the more the utility has to spend on maintenance. Another reason is time -not the age of the plant - but the year the data was collected. The economic case for nuclear power is seriously challenged. (U.K.)

  19. 48 CFR 1852.216-74 - Estimated cost and fixed fee.

    Science.gov (United States)

    2010-10-01

    ... and Clauses 1852.216-74 Estimated cost and fixed fee. As prescribed in 1816.307-70(b), insert the following clause: Estimated Cost and Fixed Fee (DEC 1991) The estimated cost of this contract is ______ exclusive of the fixed fee of ______. The total estimated cost and fixed fee is ______. (End of clause) [62...

  20. Cost-estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R.

    1993-01-01

    Various advanced power plant concepts are currently under development. These include several advanced light water reactors as well as the modular high-temperature gas-cooled reactor and the advanced liquid-metal reactor. One measure-of the attractiveness of a new concept is cost. Invariably, the cost of a new type of power plant will be compared with other alternative forms of electric generation. In order to make reasonable comparative assessments of competing technologies, consistent ground rules and assumptions must be applied when developing cost estimates. This paper describes the cost-estimate guidelines developed by Oak Ridge National Laboratory for the U.S. Department of Energy (DOE) to be used in developing cost estimates for the advanced nuclear reactors and how these guidelines relate to the DOE cost verification process

  1. Power plant cost estimates put to the test

    International Nuclear Information System (INIS)

    Crowley, J.H.

    1978-01-01

    The growth in standards for nuclear applications and the impact of these codes and standards on the cost of nuclear power plants is described. The preparation of cost estimates and reasons for apparent discrepancies are discussed. Consistent estimates of nuclear power plant costs have been prepared in the USA for over a decade. They show that the difference in capital costs between nuclear and coal fired plants is narrowing and that when total generating costs are calculated nuclear power is substantially cheaper. (UK)

  2. National waste terminal storage repository in a bedded salt formation for spent unreprocessed fuel. Special study No. 1. Twenty-five-year retrievability, decommissioning cost estimate

    International Nuclear Information System (INIS)

    1978-11-01

    This estimate covers decommissioning costs of facilities for the receipt, handling, and storage in bedded salt of canistered spent fuel assemblies from both BWR and PWR commercial power plants. The estimate includes all decommissioning costs for a repository, based on 25-year retrievability, constructed in accordance with the design shown in Conceptual Design Report (CDR), as modified by Special Study No. 1 (KE Report No. 78-60-RE) and decommissioned in accordance with the program outlined in the Conceptual Design Description Report, KE Report No. 78-58-R. Costs for Operating Contractor personnel on the site at this time are included in this report and not in the Operating Cost Estimate (KE Report 78-63-RE). The operating cost estimates end with the completion of storage room backfilling. The three major elements of decommissioning are: demolition of surface facilities, backfilling of main entries and airways, and shaft liner removal and shaft plugging. EDIT, ECON, and DELOX computer programs and a chart of accounts were furnished by UCC-ND under direction of the Government and the line item-capital-cost estimate was prepared according to the prescribed format. The decommissioning cost estimate referenced herein is in the same format as its companion line item-capital-cost estimate KE Report 78-62-RE

  3. Aircraft bi-level life cycle cost estimation

    NARCIS (Netherlands)

    Zhao, X.; Verhagen, W.J.C.; Curan, R.

    2015-01-01

    n an integrated aircraft design and analysis practice, Life Cycle Cost (LCC) is essential for decision making. The LCC of an aircraft is ordinarily partially estimated by emphasizing a specific cost type. However, an overview of the LCC including design and development cost, production cost,

  4. Estimating costs in the economic evaluation of medical technologies.

    Science.gov (United States)

    Luce, B R; Elixhauser, A

    1990-01-01

    The complexities and nuances of evaluating the costs associated with providing medical technologies are often underestimated by analysts engaged in economic evaluations. This article describes the theoretical underpinnings of cost estimation, emphasizing the importance of accounting for opportunity costs and marginal costs. The various types of costs that should be considered in an analysis are described; a listing of specific cost elements may provide a helpful guide to analysis. The process of identifying and estimating costs is detailed, and practical recommendations for handling the challenges of cost estimation are provided. The roles of sensitivity analysis and discounting are characterized, as are determinants of the types of costs to include in an analysis. Finally, common problems facing the analyst are enumerated with suggestions for managing these problems.

  5. Cost estimates for nuclear power in the UK

    International Nuclear Information System (INIS)

    Harris, Grant; Heptonstall, Phil; Gross, Robert; Handley, David

    2013-01-01

    Current UK Government support for nuclear power has in part been informed by cost estimates that suggest that electricity from new nuclear power stations will be competitive with alternative low carbon generation options. The evidence and analysis presented in this paper suggests that the capital cost estimates for nuclear power that are being used to inform these projections rely on costs escalating over the pre-construction and construction phase of the new build programme at a level significantly below those that have been experienced by past US and European programmes. This paper applies observed construction time and cost escalation rates to the published estimates of capital costs for new nuclear plant in the UK and calculates the potential impact on levelised cost per unit of electricity produced. The results suggest that levelised cost may turn out to be significantly higher than expected which in turn has important implications for policy, both in general terms of the potential costs to consumers and more specifically for negotiations around the level of policy support and contractual arrangements offered to individual projects through the proposed contract for difference strike price. -- Highlights: •Nuclear power projects costs can rise substantially during the construction period. •Pre-construction and construction time can be much longer than anticipated. •Adjusting estimates for observed experience increases levelised costs significantly. •Higher costs suggest that more policy support than envisaged may be required

  6. Fuel Cell System for Transportation -- 2005 Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Wheeler, D.

    2006-10-01

    Independent review report of the methodology used by TIAX to estimate the cost of producing PEM fuel cells using 2005 cell stack technology. The U.S. Department of Energy (DOE) Hydrogen, Fuel Cells and Infrastructure Technologies Program Manager asked the National Renewable Energy Laboratory (NREL) to commission an independent review of the 2005 TIAX cost analysis for fuel cell production. The NREL Systems Integrator is responsible for conducting independent reviews of progress toward meeting the DOE Hydrogen Program (the Program) technical targets. An important technical target of the Program is the proton exchange membrane (PEM) fuel cell cost in terms of dollars per kilowatt ($/kW). The Program's Multi-Year Program Research, Development, and Demonstration Plan established $125/kW as the 2005 technical target. Over the last several years, the Program has contracted with TIAX, LLC (TIAX) to produce estimates of the high volume cost of PEM fuel cell production for transportation use. Since no manufacturer is yet producing PEM fuel cells in the quantities needed for an initial hydrogen-based transportation economy, these estimates are necessary for DOE to gauge progress toward meeting its targets. For a PEM fuel cell system configuration developed by Argonne National Laboratory, TIAX estimated the total cost to be $108/kW, based on assumptions of 500,000 units per year produced with 2005 cell stack technology, vertical integration of cell stack manufacturing, and balance-of-plant (BOP) components purchased from a supplier network. Furthermore, TIAX conducted a Monte Carlo analysis by varying ten key parameters over a wide range of values and estimated with 98% certainty that the mean PEM fuel cell system cost would be below DOE's 2005 target of $125/kW. NREL commissioned DJW TECHNOLOGY, LLC to form an Independent Review Team (the Team) of industry fuel cell experts and to evaluate the cost estimation process and the results reported by TIAX. The results of

  7. 24 CFR 583.125 - Grants for operating costs.

    Science.gov (United States)

    2010-04-01

    .... Operating costs are those associated with the day-to-day operation of the supportive housing. They also... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Grants for operating costs. 583.125... for operating costs. (a) General. HUD will provide grants to pay a portion (as described in § 583.130...

  8. Development of a simple estimation tool for LMFBR construction cost

    International Nuclear Information System (INIS)

    Yoshida, Kazuo; Kinoshita, Izumi

    1999-01-01

    A simple tool for estimating the construction costs of liquid-metal-cooled fast breeder reactors (LMFBRs), 'Simple Cost' was developed in this study. Simple Cost is based on a new estimation formula that can reduce the amount of design data required to estimate construction costs. Consequently, Simple cost can be used to estimate the construction costs of innovative LMFBR concepts for which detailed design has not been carried out. The results of test calculation show that Simple Cost provides cost estimations equivalent to those obtained with conventional methods within the range of plant power from 325 to 1500 MWe. Sensitivity analyses for typical design parameters were conducted using Simple Cost. The effects of four major parameters - reactor vessel diameter, core outlet temperature, sodium handling area and number of secondary loops - on the construction costs of LMFBRs were evaluated quantitatively. The results show that the reduction of sodium handling area is particularly effective in reducing construction costs. (author)

  9. Calculating the Unit Cost Factors for Decommissioning Cost Estimation of the Nuclear Research Reactor

    International Nuclear Information System (INIS)

    Jeong, Kwan Seong; Lee, Dong Gyu; Jung, Chong Hun; Lee, Kune Woo

    2006-01-01

    The estimated decommissioning cost of nuclear research reactor is calculated by applying a unit cost factor-based engineering cost calculation method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning cost of nuclear research reactor is composed of labor cost, equipment and materials cost. Labor cost of decommissioning costs in decommissioning works are calculated on the basis of working time consumed in decommissioning objects. In this paper, the unit cost factors and work difficulty factors which are needed to calculate the labor cost in estimating decommissioning cost of nuclear research reactor are derived and figured out.

  10. Estimating and understanding DOE waste management costs'

    International Nuclear Information System (INIS)

    Kang, J.S.; Sherick, M.J.

    1995-01-01

    This paper examines costs associated with cleaning up the US Department of Energy's (DOE's) nuclear facilities, with particular emphasis on the waste management program. Life-cycle waste management costs have been compiled and reported in the DOE Baseline Environmental Management Report (BEMR). Waste management costs are a critical issue for DOE because of the current budget constraints. The DOE sites are struggling to accomplish their environmental management objectives given funding scenarios that are well below anticipated waste management costs. Through the BEMR process, DOE has compiled complex-wide cleanup cost estimates and has begun analysis of these costs with respect to alternative waste management scenarios and policy strategies. From this analysis, DOE is attempting to identify the major cost drivers and prioritize environmental management activities to achieve maximum utilization of existing funding. This paper provides an overview of the methodology DOE has used to estimate and analyze some waste management costs, including the key data requirements and uncertainties

  11. An Overview Of Tool For Response Action Cost Estimating (TRACE)

    International Nuclear Information System (INIS)

    Ferries, S.R.; Klink, K.L.; Ostapkowicz, B.

    2012-01-01

    Tools and techniques that provide improved performance and reduced costs are important to government programs, particularly in current times. An opportunity for improvement was identified for preparation of cost estimates used to support the evaluation of response action alternatives. As a result, CH2M HILL Plateau Remediation Company has developed Tool for Response Action Cost Estimating (TRACE). TRACE is a multi-page Microsoft Excel(reg s ign) workbook developed to introduce efficiencies into the timely and consistent production of cost estimates for response action alternatives. This tool combines costs derived from extensive site-specific runs of commercially available remediation cost models with site-specific and estimator-researched and derived costs, providing the best estimating sources available. TRACE also provides for common quantity and key parameter links across multiple alternatives, maximizing ease of updating estimates and performing sensitivity analyses, and ensuring consistency.

  12. 78 FR 61227 - Public Assistance Cost Estimating Format for Large Projects

    Science.gov (United States)

    2013-10-03

    ... equipment. The base cost (construction costs) plus nonconstruction costs equal the total eligible cost... included the estimated base cost plus the estimated nonconstruction costs. Under the traditional method... total cost of completing the project. This ``forward- pricing'' methodology provides an estimate of the...

  13. Injection of radioactive waste by hydraulic fracturing at West Valley, New York. Volume 4. Supplement 1: Cost estimate

    International Nuclear Information System (INIS)

    Burgess, A.S.; Thompson, S.N.

    1978-05-01

    The costs for injecting 3 million gallons of waste/grout mix in 200,000-gallon batches over 2 years are estimated to be 9.75 million dollars (including direct, indirect, operational, and decommissioning costs)

  14. Cost-price estimation of clinical laboratory services based on activity-based costing: A case study from a developing country.

    Science.gov (United States)

    Mouseli, Ali; Barouni, Mohsen; Amiresmaili, Mohammadreza; Samiee, Siamak Mirab; Vali, Leila

    2017-04-01

    It is believed that laboratory tariffs in Iran don't reflect the real costs. This might expose private laboratories at financial hardship. Activity Based Costing is widely used as a cost measurement instrument to more closely approximate the true cost of operations. This study aimed to determine the real price of different clinical tests of a selected private clinical laboratory. This study was a cross sectional study carried out in 2015. The study setting was the private laboratories in the city of Kerman, Iran. Of 629 tests in the tariff book of the laboratory (relative value), 188 tests were conducted in the laboratory that used Activity Based Costing (ABC) methodology to estimate cost-price. Analyzing and cost-price estimating of laboratory services were performed by MY ABCM software Version 5.0. In 2015, the total costs were $641,645. Direct and indirect costs were 78.3% and 21.7% respectively. Laboratory consumable costs by 37% and personnel costs by 36.3% had the largest share of the costing. Also, group of hormone tests cost the most $147,741 (23.03%), and other tests group cost the least $3,611 (0.56%). Also after calculating the cost of laboratory services, a comparison was made between the calculated price and the private sector's tariffs in 2015. This study showed that there was a difference between costs and tariffs in the private laboratory. One way to overcome this problem is to increase the number of laboratory tests with regard to capacity of the laboratories.

  15. Support to LANL: Cost estimation. Final report

    International Nuclear Information System (INIS)

    1993-01-01

    This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOE planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors

  16. U-AVLIS feed conversion using continuous metallothermic reduction of UF4: System description and cost estimate

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of this document is to present a system description and develop baseline capital and operating cost estimates for commercial facilities which produced U-Fe feedstock for AVLIS enrichment plants using the continuous fluoride reduction (CFR) process. These costs can then be used together with appropriate economic assumptions to calculate estimated unit costs to the AVLIS plant owner (or utility customer) for such conversion services. Six cases are being examined. All cases assume that the conversion services are performed by a private company at a commercial site which has an existing NRC license to possess source material and which has existing uranium processing operations. The cases differ in terms of annual production capacity and whether the new process system is installed in a new building or in an existing building on the site. The six cases are summarized here

  17. The Practice of Cost Estimation for Decommissioning of Nuclear Facilities

    International Nuclear Information System (INIS)

    Davidova, Ivana; Desecures, Sylvain; Lexow, Thomas; Buonarroti, Stefano; Marini, Giuseppe; Pescatore, Claudio; Rehak, Ivan; Weber, Inge; ); Daniska, Vladimir; Linan, Jorge Borque; Caroll, Simon; Hedberg, Bjoern; De La Gardie, Fredrik; Haenggi, Hannes; Laguardia, Thomas S.; Ridpath, Andy

    2015-01-01

    Decommissioning of both commercial and R and D nuclear facilities is expected to increase significantly in the coming years, and the largest of such industrial decommissioning projects could command considerable budgets. Several approaches are currently being used for decommissioning cost estimations, with an international culture developing in the field. The present cost estimation practice guide was prepared in order to offer international actors specific guidance in preparing quality cost and schedule estimates to support detailed budgeting for the preparation of decommissioning plans, for the securing of funds and for decommissioning implementation. This guide is based on current practices and standards in a number of NEA member countries and aims to help consolidate the practice and process of decommissioning cost estimation so as to make it more widely understood. It offers a useful reference for the practitioner and for training programmes. The remainder of report is divided into the following chapters: - Chapter 2 covers the purpose and nature of decommissioning cost estimates, approaches to cost estimation and the major elements of a cost estimate. - Chapter 3 examines the development of the integrated schedule of the activity-dependent work scope and the determination of the project critical path. - Chapter 4 describes the attributes of a quality assurance programme applicable to cost estimation and the use and cautions of benchmarking the estimate from other estimates or actual costs. - Chapter 5 describes the pyramidal structure of the report, and the scope and content that should be included in the cost study report to ensure consistency and transparency in the estimate underpinnings. - Chapter 6 provides some observations, conclusions and recommendations on the use of this guide

  18. A life cycle cost economics model for projects with uniformly varying operating costs. [management planning

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

  19. Costs and indices for domestic oil and gas field equipment and production operations 1990 through 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-08

    This report presents estimated costs and indice for domestic oil and gas field equipment and production operations for 1990, 1991, 1992, and 1993. The costs of all equipment and serives were those in effect during June of each year. The sums (aggregates) of the costs for representative leases by region, depth, and production rate were averaged and indexed. This provides a general measure of the increased or decreased costs from year to year for lease equipment and operations. These general measures do not capture changes in industry-wide costs exactly because of annual variations in the ratio of oil wells to gas wells. The body of the report contains summary tables, and the appendices contain detailed tables. Price changes for oil and gas, changes in taxes on oil and gas revenues, and environmental factors (costs and lease availability) have significant impact on the number and cost of oil and gas wells drilled. These changes also impact the cost of oil and gas production equipment and operations.

  20. Costs and indices for domestic oil and gas field equipment and production operations 1990 through 1993

    International Nuclear Information System (INIS)

    1994-01-01

    This report presents estimated costs and indice for domestic oil and gas field equipment and production operations for 1990, 1991, 1992, and 1993. The costs of all equipment and serives were those in effect during June of each year. The sums (aggregates) of the costs for representative leases by region, depth, and production rate were averaged and indexed. This provides a general measure of the increased or decreased costs from year to year for lease equipment and operations. These general measures do not capture changes in industry-wide costs exactly because of annual variations in the ratio of oil wells to gas wells. The body of the report contains summary tables, and the appendices contain detailed tables. Price changes for oil and gas, changes in taxes on oil and gas revenues, and environmental factors (costs and lease availability) have significant impact on the number and cost of oil and gas wells drilled. These changes also impact the cost of oil and gas production equipment and operations

  1. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    Keywords: Cost estimation, estimation methods, emerging contractors, tender. Dr Solly Matshonisa .... historical cost data (data from cost accounting records and/ ..... emerging contractors in tendering. Table 13: Use of project risk management versus responsibility: expected. Internal document analysis. Checklist analysis.

  2. 48 CFR 1852.216-85 - Estimated cost and award fee.

    Science.gov (United States)

    2010-10-01

    ... and Clauses 1852.216-85 Estimated cost and award fee. As prescribed in 1816.406-70(e), insert the following clause: Estimated Cost and Award Fee (SEP 1993) The estimated cost of this contract is $___. The... cost, base fee, and maximum award fee are $___. (End of clause) Alternate I (SEP 1993). As prescribed...

  3. Major weapon system environmental life-cycle cost estimating for Conservation, Cleanup, Compliance and Pollution Prevention (C3P2)

    Science.gov (United States)

    Hammond, Wesley; Thurston, Marland; Hood, Christopher

    1995-01-01

    The Titan 4 Space Launch Vehicle Program is one of many major weapon system programs that have modified acquisition plans and operational procedures to meet new, stringent environmental rules and regulations. The Environmental Protection Agency (EPA) and the Department of Defense (DOD) mandate to reduce the use of ozone depleting chemicals (ODC's) is just one of the regulatory changes that has affected the program. In the last few years, public environmental awareness, coupled with stricter environmental regulations, has created the need for DOD to produce environmental life-cycle cost estimates (ELCCE) for every major weapon system acquisition program. The environmental impact of the weapon system must be assessed and budgeted, considering all costs, from cradle to grave. The Office of the Secretary of Defense (OSD) has proposed that organizations consider Conservation, Cleanup, Compliance and Pollution Prevention (C(sup 3)P(sup 2)) issues associated with each acquisition program to assess life-cycle impacts and costs. The Air Force selected the Titan 4 system as the pilot program for estimating life-cycle environmental costs. The estimating task required participants to develop an ELCCE methodology, collect data to test the methodology and produce a credible cost estimate within the DOD C(sup 3)P(sup 2) definition. The estimating methodology included using the Program Office weapon system description and work breakdown structure together with operational site and manufacturing plant visits to identify environmental cost drivers. The results of the Titan IV ELCCE process are discussed and expanded to demonstrate how they can be applied to satisfy any life-cycle environmental cost estimating requirement.

  4. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Hudson, C.R. II.

    1986-07-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies

  5. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Hudson, C.R. II.

    1987-07-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies

  6. MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT

    International Nuclear Information System (INIS)

    R.E. Sweeney

    2001-01-01

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost (LCC) estimate and schedule update incorporating information from the Viability Assessment (VA) , License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance

  7. Monitored Geologic Repository Life Cycle Cost Estimate Assumptions Document

    International Nuclear Information System (INIS)

    Sweeney, R.

    2000-01-01

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost estimate and schedule update incorporating information from the Viability Assessment (VA), License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance

  8. 42 CFR 417.930 - Initial costs of operation.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Initial costs of operation. 417.930 Section 417.930... PREPAYMENT PLANS Administration of Outstanding Loans and Loan Guarantees § 417.930 Initial costs of operation. Under section 1305 of the PHS, loans and loan guarantees were awarded for initial costs of operation of...

  9. Experiments, conceptual design, preliminary cost estimates and schedules for an underground research facility

    International Nuclear Information System (INIS)

    Korbin, G.; Wollenberg, H.; Wilson, C.; Strisower, B.; Chan, T.; Wedge, D.

    1981-09-01

    Plans for an underground research facility are presented, incorporating techniques to assess the hydrological and thermomechanical response of a rock mass to the introduction and long-term isolation of radioactive waste, and to assess the effects of excavation on the hydrologic integrity of a repository and its subsequent backfill, plugging, and sealing. The project is designed to utilize existing mine or civil works for access to experimental areas and is estimated to last 8 years at a total cost for contruction and operation of $39.0 million (1981 dollars). Performing the same experiments in an existing underground research facility would reduce the duration to 7-1/2 years and cost $27.7 million as a lower-bound estimate. These preliminary plans and estimates should be revised after specific sites are identified which would accommodate the facility

  10. Operating cost estimate low-level radioactive waste volume reduction and packaging options

    International Nuclear Information System (INIS)

    Williams, P.C.; Collins, E.G.

    1983-01-01

    The projected operating cost data examine the differences in compaction and incineration for DAW. Two commonly achieved densities for compaction are presented, while a third case approaching the theoretical density of the cloth and paper materials shows the interesting possibilities of improved compaction. Incineration at two benchmarks for the chlorinated plastic component of typical DAW illustrates the impact waste stream make-up has on economics. Evaporator concentrates are considered as a liquid at four concentrations (6%, 12%, 25% and 50%) and after all water has been removed for the cement and polymer cases. Five separate processing schemes are presented for bead resins. These range from dewatering and packaging in high integrity containers to incineration with solidification

  11. Computerized cost estimation spreadsheet and cost data base for fusion devices

    International Nuclear Information System (INIS)

    Hamilton, W.R.; Rothe, K.E.

    1985-01-01

    Component design parameters (weight, surface area, etc.) and cost factors are input and direct and indirect costs are calculated. The cost data base file derived from actual cost experience within the fusion community and refined to be compatible with the spreadsheet costing approach is a catalog of cost coefficients, algorithms, and component costs arranged into data modules corresponding to specific components and/or subsystems. Each data module contains engineering, equipment, and installation labor cost data for different configurations and types of the specific component or subsystem. This paper describes the assumptions, definitions, methodology, and architecture incorporated in the development of the cost estimation spreadsheet and cost data base, along with the type of input required and the output format

  12. MRS/IS facility co-located with a repository: preconceptual design and life-cycle cost estimates

    International Nuclear Information System (INIS)

    Smith, R.I.; Nesbitt, J.F.

    1982-11-01

    A program is described to examine the various alternatives for monitored retrievable storage (MRS) and interim storage (IS) of spent nuclear fuel, solidified high-level waste (HLW), and transuranic (TRU) waste until appropriate geologic repository/repositories are available. The objectives of this study are: (1) to develop a preconceptual design for an MRS/IS facility that would become the principal surface facility for a deep geologic repository when the repository is opened, (2) to examine various issues such as transportation of wastes, licensing of the facility, and environmental concerns associated with operation of such a facility, and (3) to estimate the life cycle costs of the facility when operated in response to a set of scenarios which define the quantities and types of waste requiring storage in specific time periods, which generally span the years from 1990 until 2016. The life cycle costs estimated in this study include: the capital expenditures for structures, casks and/or drywells, storage areas and pads, and transfer equipment; the cost of staff labor, supplies, and services; and the incremental cost of transporting the waste materials from the site of origin to the MRS/IS facility. Three scenarios are examined to develop estimates of life cycle costs of the MRS/IS facility. In the first scenario, HLW canisters are stored, starting in 1990, until the co-located repository is opened in the year 1998. Additional reprocessing plants and repositories are placed in service at various intervals. In the second scenario, spent fuel is stored, starting in 1990, because the reprocessing plants are delayed in starting operations by 10 years, but no HLW is stored because the repositories open on schedule. In the third scenario, HLW is stored, starting in 1990, because the repositories are delayed 10 years, but the reprocessing plants open on schedule

  13. Contingency Cost estimation for Research reactor Decommissioning

    International Nuclear Information System (INIS)

    Jin, Hyung Gon; Hong, Yun Jeong

    2016-01-01

    There are many types of cost items in decommissioning cost estimation, however, contingencies are for unforeseen elements of cost within the defined project scope. Regulatory body wants to reasonable quantification for this issue. Many countries have adopted the breakdown of activity dependent and period-dependent costs to structure their estimates. Period-dependent costs could be broken down into defined time frames to reduce overall uncertainties. Several countries apply this notion by having different contingency factors for different phases of the project. This study is a compilation of contingency cost of research reactor and for each country. Simulation techniques using TRIM, MATLAB, and PSpice can be useful tools for designing detector channels. Thus far TRIM, MATLAB and PSpice have been used to calculate the detector current output pulse for SiC semiconductor detectors and to model the pulses that propagate through potential detector channels. This model is useful for optimizing the detector and the resolution for application to neutron monitoring in the Generation IV power reactors

  14. Contingency Cost estimation for Research reactor Decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Hyung Gon; Hong, Yun Jeong [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    There are many types of cost items in decommissioning cost estimation, however, contingencies are for unforeseen elements of cost within the defined project scope. Regulatory body wants to reasonable quantification for this issue. Many countries have adopted the breakdown of activity dependent and period-dependent costs to structure their estimates. Period-dependent costs could be broken down into defined time frames to reduce overall uncertainties. Several countries apply this notion by having different contingency factors for different phases of the project. This study is a compilation of contingency cost of research reactor and for each country. Simulation techniques using TRIM, MATLAB, and PSpice can be useful tools for designing detector channels. Thus far TRIM, MATLAB and PSpice have been used to calculate the detector current output pulse for SiC semiconductor detectors and to model the pulses that propagate through potential detector channels. This model is useful for optimizing the detector and the resolution for application to neutron monitoring in the Generation IV power reactors.

  15. Cost estimation for decommissioning: a review of current practice

    International Nuclear Information System (INIS)

    O'Sullivan, P.; Pescatore, C.

    2009-01-01

    It is now common practice for decommissioning plans and associated cost estimates to be prepared for all nuclear installations. Specific requirements are generally set out in regulations that have their basis in national legislation. These estimates are important for ensuring that the necessary funds are being collected to cover the actual costs of decommissioning the facility. The long time horizon for both amassing and disbursing these funds is a particular concern for national authorities. It is thus important to maintain a realistic estimate of the liabilities involved and to confirm the adequacy of the provisions to discharge them over time. Estimates of decommissioning costs have been performed and published by many organisations for many different purposes and applications. The results often vary because of differences in basic assumptions such as the choice of the decommissioning strategy (immediate vs. deferred), the availability of waste management pathways, the assumed end states of installations, the detailed definition of cost items, technical uncertainties, unforeseen events, the evolution of regulation and requirements. Many of these differences may be unavoidable since a reasonable degree of reliability and accuracy can only be achieved by developing decommissioning cost estimates on a case-by-case, site-specific basis. Moreover, even if considerable efforts are made to obtain reliable estimates, unforeseen events may cause estimates to go wrong. The issue of how to deal with uncertainties is therefore an important one, leading in turn to the need for risk management in terms of making adequate funding provisions. In March 2008, a questionnaire was circulated among the organisations participating in the NEA Decommissioning and Cost Estimation Group (DCEG). Information was collected on legal requirements and the responsibilities of the main parties concerned with the preparation and oversight of cost estimates, the main cost elements and associated

  16. Valuing productivity costs in a changing macroeconomic environment: the estimation of colorectal cancer productivity costs using the friction cost approach.

    Science.gov (United States)

    Hanly, Paul; Koopmanschap, Marc; Sharp, Linda

    2016-06-01

    The friction cost approach (FCA) has been proposed as an alternative to the human capital approach for productivity cost valuation. However, FCA estimates are context dependent and influenced by extant macroeconomic conditions. We applied the FCA to estimate colorectal cancer labor productivity costs and assessed the impact of a changing macroeconomic environment on these estimates. Data from colorectal cancer survivors (n = 159) derived from a postal survey undertaken in Ireland March 2010 to January 2011 were combined with national wage data, population-level survival data, and occupation-specific friction periods to calculate temporary and permanent disability, and premature mortality costs using the FCA. The effects of changing labor market conditions between 2006 and 2013 on the friction period were modeled in scenario analyses. Costs were valued in 2008 euros. In the base-case, the total FCA per-person productivity cost for incident colorectal cancer patients of working age at diagnosis was €8543. In scenario 1 (a 2.2 % increase in unemployment), the fall in the friction period caused total productivity costs to decrease by up to 18 % compared to base-case estimates. In scenario 2 (a 9.2 % increase in unemployment), the largest decrease in productivity cost was up to 65 %. Adjusting for the vacancy rate reduced the effect of unemployment on the cost results. The friction period used in calculating labor productivity costs greatly affects the derived estimates; this friction period requires reassessment following changes in labor market conditions. The influence of changes in macroeconomic conditions on FCA-derived cost estimates may be substantial.

  17. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill

  18. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill.

  19. Estimated Annual Maintenance Costs for Educational Facilities in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    Global estimated annual costs for undertaking basic maintenance of all educational facilities in Eritrea.......Global estimated annual costs for undertaking basic maintenance of all educational facilities in Eritrea....

  20. Productivity and cost estimators for conventional ground-based skidding on steep terrain using preplanned skid roads

    Science.gov (United States)

    Michael D. Erickson; Curt C. Hassler; Chris B. LeDoux

    1991-01-01

    Continuous time and motion study techniques were used to develop productivity and cost estimators for the skidding component of ground-based logging systems, operating on steep terrain using preplanned skid roads. Comparisons of productivity and costs were analyzed for an overland random access skidding method, verses a skidding method utilizing a network of preplanned...

  1. Estimating the opportunity costs of bed-days.

    Science.gov (United States)

    Sandmann, Frank G; Robotham, Julie V; Deeny, Sarah R; Edmunds, W John; Jit, Mark

    2018-03-01

    Opportunity costs of bed-days are fundamental to understanding the value of healthcare systems. They greatly influence burden of disease estimations and economic evaluations involving stays in healthcare facilities. However, different estimation techniques employ assumptions that differ crucially in whether to consider the value of the second-best alternative use forgone, of any available alternative use, or the value of the actually chosen alternative. Informed by economic theory, this paper provides a taxonomic framework of methodologies for estimating the opportunity costs of resources. This taxonomy is then applied to bed-days by classifying existing approaches accordingly. We highlight differences in valuation between approaches and the perspective adopted, and we use our framework to appraise the assumptions and biases underlying the standard approaches that have been widely adopted mostly unquestioned in the past, such as the conventional use of reference costs and administrative accounting data. Drawing on these findings, we present a novel approach for estimating the opportunity costs of bed-days in terms of health forgone for the second-best patient, but expressed monetarily. This alternative approach effectively re-connects to the concept of choice and explicitly considers net benefits. It is broadly applicable across settings and for other resources besides bed-days. © 2017 The Authors Health Economics published by John Wiley & Sons Ltd.

  2. Costs and indices for domestic oil and gas field equipment and production operations, 1992--1995

    International Nuclear Information System (INIS)

    1996-08-01

    This report presents estimated costs and cost indices for domestic oil and natural gas field equipment and production operations for 1992, 1993, 1994, and 1995. The costs of all equipment and services are those in effect during June of each year. The sum (aggregates) of the costs for representative leases by region, depth, and production rate were averaged and indexed. This provides a general measure of the increased or decreased costs from year to year for lease equipment and operations. These general measured do not capture changes in industry-wide costs exactly because of annual variations in the ratio of the total number of oil wells to the total number of gas wells. The detail provided in this report is unavailable elsewhere. The body of this report contains summary tables, and the appendices contain detailed tables

  3. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R. II.

    1990-03-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies. 10 refs., 8 figs., 32 tabs

  4. Estimating the cost to U.S. health departments to conduct HIV surveillance.

    Science.gov (United States)

    Shrestha, Ram K; Sansom, Stephanie L; Laffoon, Benjamin T; Farnham, Paul G; Shouse, R Luke; MacMaster, Karen; Hall, H Irene

    2014-01-01

    HIV case surveillance is a primary source of information for monitoring HIV burden in the United States and guiding the allocation of prevention and treatment funds. While the number of people living with HIV and the need for surveillance data have increased, little is known about the cost of surveillance. We estimated the economic cost to health departments of conducting high-quality HIV case surveillance. We collected primary data on the unit cost and quantity of resources used to operate the HIV case surveillance program in Michigan, where HIV burden (i.e., the number of HIV cases) is moderate to high (n=14,864 cases). Based on Michigan's data, we projected the expected annual HIV surveillance cost for U.S., state, local, and territorial health departments. We based our cost projection on the variation in the number of new and established cases, area-specific wages, and potential economies of scale. We estimated the annual total HIV surveillance cost to the Michigan health department to be $1,286,524 ($87/case), the annual total cost of new cases to be $108,657 ($133/case), and the annual total cost of established cases to be $1,177,867 ($84/case). Our projected median annual HIV surveillance cost per health department ranged from $210,600 in low-HIV burden sites to $1,835,000 in high-HIV burden sites. Our analysis shows that a systematic approach to costing HIV surveillance at the health department level is feasible. For HIV surveillance, a substantial portion of total surveillance costs is attributable to maintaining established cases.

  5. Cost estimations for deep disposal of spent nuclear fuels; Kostnadsberaekning av djupfoervaring av det anvanda kaernbraenslet

    Energy Technology Data Exchange (ETDEWEB)

    Palmqvist, K.; Wallroth, T. [BERGAB - Berggeologiska Undersoekningar AB, Goeteborg (Sweden); Green, L.; Joensson, Lars [Peab Berg AB, Goeteborg (Sweden)

    1999-10-01

    According to the Act on the Financing of Future Expenses for Spent Nuclear Fuel etc. (Financing Act), the Swedish Nuclear Fuel and Waste Management Co. (SKB) must submit, every year, to the Swedish Nuclear Power Inspectorate (SKI), a cost estimate for the management of spent nuclear fuel and for the decommissioning and dismantling of the nuclear power plants. After SKI has examined and evaluated the cost estimates, SKI must submit a proposal to the Government concerning the fee which should be paid by the nuclear power companies per kWh of generated electricity. According to the Financing Act, the reactor owners must pledge collateral in the event that the accumulated fees should be found to be insufficient as a result of early closure of reactors or as a result of underestimating the future expenses of managing the spent nuclear fuel and of decommissioning and dismantling the reactors. The future total expenses resulting from the Financing Act are estimated at about SEK 48 billion at the January 1998 price level. Of this amount, the cost of the final disposal of spent nuclear fuel in SKB's programme is expected to amount to about SEK 12 billion. SKB's estimate comprises the cost of siting, construction and operation of a deep repository for spent nuclear fuel, based on the KBS-3 concept, and a rock cavern for other long-lived waste which SKB plans to locate next to the spent fuel repository. The cost estimate also includes the dismantling and closure of the facility once all of the fuel and the long-lived waste are deposited. The calculations are based on all of the fuel, which will be generated through the operation of the 12 Swedish reactors during a period of 25 years and for every additional year of operation. At the beginning of 1998, SKI commissioned BERGAB to evaluate the cost estimate for the deep disposal of the spent nuclear fuel. The task was divided into two stages, namely a study which was submitted in June 1998 concerning the technical

  6. U-AVLIS feed conversion using continuous metallothermic reduction of UF{sub 4}: System description and cost estimate

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The purpose of this document is to present a system description and develop baseline capital and operating cost estimates for commercial facilities which produced U-Fe feedstock for AVLIS enrichment plants using the continuous fluoride reduction (CFR) process. These costs can then be used together with appropriate economic assumptions to calculate estimated unit costs to the AVLIS plant owner (or utility customer) for such conversion services. Six cases are being examined. All cases assume that the conversion services are performed by a private company at a commercial site which has an existing NRC license to possess source material and which has existing uranium processing operations. The cases differ in terms of annual production capacity and whether the new process system is installed in a new building or in an existing building on the site. The six cases are summarized here.

  7. A Study of Ship Acquisition Cost Estimating in the Naval Sea Systems Command. Appendices

    Science.gov (United States)

    1977-10-01

    acquisition pro- cess, the recommendations are linked to form a structure that is applicable for acquisition progress of all agencies...and impact on cost. CAIG considers GFM estimates to be the weakest link in the estimating process and suggests making it mandatory that the PARMs...tor- pedo and missile orders; and for providing display data to fire control systems and tactical data system operators. The AN/UYK-7 is installed

  8. Cost of Operating Central Cancer Registries and Factors That Affect Cost: Findings From an Economic Evaluation of Centers for Disease Control and Prevention National Program of Cancer Registries.

    Science.gov (United States)

    Tangka, Florence K L; Subramanian, Sujha; Beebe, Maggie Cole; Weir, Hannah K; Trebino, Diana; Babcock, Frances; Ewing, Jean

    2016-01-01

    The Centers for Disease Control and Prevention (CDC) evaluated the economics of the National Program of Cancer Registries to provide the CDC, the registries, and policy makers with the economics evidence-base to make optimal decisions about resource allocation. Cancer registry budgets are under increasing threat, and, therefore, systematic assessment of the cost will identify approaches to improve the efficiencies of this vital data collection operation and also justify the funding required to sustain registry operations. To estimate the cost of cancer registry operations and to assess the factors affecting the cost per case reported by National Program of Cancer Registries-funded central cancer registries. We developed a Web-based cost assessment tool to collect 3 years of data (2009-2011) from each National Program of Cancer Registries-funded registry for all actual expenditures for registry activities (including those funded by other sources) and factors affecting registry operations. We used a random-effects regression model to estimate the impact of various factors on cost per cancer case reported. The cost of reporting a cancer case varied across the registries. Central cancer registries that receive high-quality data from reporting sources (as measured by the percentage of records passing automatic edits) and electronic data submissions, and those that collect and report on a large volume of cases had significantly lower cost per case. The volume of cases reported had a large effect, with low-volume registries experiencing much higher cost per case than medium- or high-volume registries. Our results suggest that registries operate with substantial fixed or semivariable costs. Therefore, sharing fixed costs among low-volume contiguous state registries, whenever possible, and centralization of certain processes can result in economies of scale. Approaches to improve quality of data submitted and increasing electronic reporting can also reduce cost.

  9. Estimating Maintenance Cost for Web Applications

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the issue of determining a method for estimating maintenance costs for web applications. The current state of research in the field of web application maintenance is summarized and leading theories and results are highlighted. The cost of web maintenance is determined by the number of man-hours invested in maintenance tasks. Web maintenance tasks are categorized into content maintenance and technical maintenance. Research is centered on analyzing technical maintenance tasks. The research hypothesis is formulated on the assumption that the number of man-hours invested in maintenance tasks can be assessed based on the web application’s user interaction level, complexity and content update effort. Data regarding the costs of maintenance tasks is collected from 24 maintenance projects implemented by a web development company that tackles a wide area of web applications. Homogeneity and diversity of collected data is submitted for debate by presenting a sample of the data and depicting the overall size and comprehensive nature of the entire dataset. A set of metrics dedicated to estimating maintenance costs in web applications is defined based on conclusions formulated by analyzing the collected data and the theories and practices dominating the current state of research. Metrics are validated with regards to the initial research hypothesis. Research hypothesis are validated and conclusions are formulated on the topic of estimating the maintenance cost of web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  10. Cross Service Fixed-Wing Cost Estimation

    Science.gov (United States)

    2016-05-17

    costing aircraft , such as cost per system or cost per Air Force unit. There are differing opinions on how costs should be determined for aircraft . A 2010...large confidence interval , but this is most likely because of the addition of the B-2 Bomber, 15 Figure 8. CPFH Trends of Various Aircraft a very... Maintenance O&S Operating and Support OSD Office of the Secretary of Defense PAI Primary Aircraft Inventory POL Petroleum, Lubricants, and Oil SME

  11. MONITOR: A computer model for estimating the costs of an integral monitored retrievable storage facility

    International Nuclear Information System (INIS)

    Reimus, P.W.; Sevigny, N.L.; Schutz, M.E.; Heller, R.A.

    1986-12-01

    The MONITOR model is a FORTRAN 77 based computer code that provides parametric life-cycle cost estimates for a monitored retrievable storage (MRS) facility. MONITOR is very flexible in that it can estimate the costs of an MRS facility operating under almost any conceivable nuclear waste logistics scenario. The model can also accommodate input data of varying degrees of complexity and detail (ranging from very simple to more complex) which makes it ideal for use in the MRS program, where new designs and new cost data are frequently offered for consideration. MONITOR can be run as an independent program, or it can be interfaced with the Waste System Transportation and Economic Simulation (WASTES) model, a program that simulates the movement of waste through a complete nuclear waste disposal system. The WASTES model drives the MONITOR model by providing it with the annual quantities of waste that are received, stored, and shipped at the MRS facility. Three runs of MONITOR are documented in this report. Two of the runs are for Version 1 of the MONITOR code. A simulation which uses the costs developed by the Ralph M. Parsons Company in the 2A (backup) version of the MRS cost estimate. In one of these runs MONITOR was run as an independent model, and in the other run MONITOR was run using an input file generated by the WASTES model. The two runs correspond to identical cases, and the fact that they gave identical results verified that the code performed the same calculations in both modes of operation. The third run was made for Version 2 of the MONITOR code. A simulation which uses the costs developed by the Ralph M. Parsons Company in the 2B (integral) version of the MRS cost estimate. This run was made with MONITOR being run as an independent model. The results of several cases have been verified by hand calculations

  12. Estimating the economic cost of disability in Ireland

    OpenAIRE

    Cullinan, John; Gannon, Brenda; Lyons, Seán

    2008-01-01

    Addressing the extra economic costs of disability seems a logical step towards alleviating elements of social exclusion for people with disabilities. This paper estimates the economic cost of disability in Ireland in terms of the additional spending needs that arise due to disability. It defines and estimates models of the private costs borne by families with individuals who have a disability in Ireland when compared to the wider population, both in general and by severity of illness. Our mod...

  13. A Probabilistic Cost Estimation Model for Unexploded Ordnance Removal

    National Research Council Canada - National Science Library

    Poppe, Peter

    1999-01-01

    ...) contaminated sites that the services must decontaminate. Existing models for estimating the cost of UXO removal often require a high level of expertise and provide only a point estimate for the costs...

  14. Reusable single-port access device shortens operative time and reduces operative costs.

    Science.gov (United States)

    Shussman, Noam; Kedar, Asaf; Elazary, Ram; Abu Gazala, Mahmoud; Rivkind, Avraham I; Mintz, Yoav

    2014-06-01

    In recent years, single-port laparoscopy (SPL) has become an attractive approach for performing surgical procedures. The pitfalls of this approach are technical and financial. Financial concerns are due to the increased cost of dedicated devices and prolonged operating room time. Our aim was to calculate the cost of SPL using a reusable port and instruments in order to evaluate the cost difference between this approach to SPL using the available disposable ports and standard laparoscopy. We performed 22 laparoscopic procedures via the SPL approach using a reusable single-port access system and reusable laparoscopic instruments. These included 17 cholecystectomies and five other procedures. Operative time, postoperative length of stay (LOS) and complications were prospectively recorded and were compared with similar data from our SPL database. Student's t test was used for statistical analysis. SPL was successfully performed in all cases. Mean operative time for cholecystectomy was 72 min (range 40-116). Postoperative LOS was not changed from our standard protocols and was 1.1 days for cholecystectomy. The postoperative course was within normal limits for all patients and perioperative morbidity was recorded. Both operative time and length of hospital stay were shorter for the 17 patients who underwent cholecystectomy using a reusable port than for the matched previous 17 SPL cholecystectomies we performed (p cost difference. Operating with a reusable port ended up with an average cost savings of US$388 compared with using disposable ports, and US$240 compared with standard laparoscopy. Single-port laparoscopic surgery is a technically challenging and expensive surgical approach. Financial concerns among others have been advocated against this approach; however, we demonstrate herein that using a reusable port and instruments reduces operative time and overall operative costs, even beyond the cost of standard laparoscopy.

  15. Development of hybrid lifecycle cost estimating tool (HLCET) for manufacturing influenced design tradeoff

    Science.gov (United States)

    Sirirojvisuth, Apinut

    concept, the additional manufacturing knowledge can be used to identify a more accurate lifecycle cost and facilitate higher fidelity tradeoffs during conceptual and preliminary design. Advanced Composite Cost Estimating Model (ACCEM) is employed as a process-based cost component to replace the original TCM result of the composite part production cost. The reason for the replacement is that TCM estimates production costs from part weights as a result of subtractive manufacturing of metallic origin such as casting, forging, and machining processes. A complexity factor can sometimes be adjusted to reflect different types of metal and machine settings. The TCM assumption, however, gives erroneous results when applied to additive processes like those of composite manufacturing. Another innovative aspect of this research is the introduction of a work measurement technique called Maynard Operation Sequence Technique (MOST) to be used, similarly to Activity-Based Costing (ABC) approach, to estimate manufacturing time of a part by virtue of breaking down the operations occurred during its production. ABC allows a realistic determination of cost incurred in each activity, as opposed to using a traditional method of time estimation by analogy or using response surface equations from historical process data. The MOST concept provides a tailored study of an individual process typically required for a new, innovative design. Nevertheless, the MOST idea has some challenges, one of which is its requirement to build a new process from ground up. The process development requires a Subject Matter Expertise (SME) in manufacturing method of the particular design. The SME must have also a comprehensive understanding of the MOST system so that the correct parameters are chosen. In practice, these knowledge requirements may demand people from outside of the design discipline and a priori training of MOST. To relieve the constraint, this study includes an entirely new sub-system architecture

  16. Project Cost Estimation for Planning

    Science.gov (United States)

    2010-02-26

    For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...

  17. Estimating productivity costs using the friction cost approach in practice: a systematic review.

    Science.gov (United States)

    Kigozi, Jesse; Jowett, Sue; Lewis, Martyn; Barton, Pelham; Coast, Joanna

    2016-01-01

    The choice of the most appropriate approach to valuing productivity loss has received much debate in the literature. The friction cost approach has been proposed as a more appropriate alternative to the human capital approach when valuing productivity loss, although its application remains limited. This study reviews application of the friction cost approach in health economic studies and examines how its use varies in practice across different country settings. A systematic review was performed to identify economic evaluation studies that have estimated productivity costs using the friction cost approach and published in English from 1996 to 2013. A standard template was developed and used to extract information from studies meeting the inclusion criteria. The search yielded 46 studies from 12 countries. Of these, 28 were from the Netherlands. Thirty-five studies reported the length of friction period used, with only 16 stating explicitly the source of the friction period. Nine studies reported the elasticity correction factor used. The reported friction cost approach methods used to derive productivity costs varied in quality across studies from different countries. Few health economic studies have estimated productivity costs using the friction cost approach. The estimation and reporting of productivity costs using this method appears to differ in quality by country. The review reveals gaps and lack of clarity in reporting of methods for friction cost evaluation. Generating reporting guidelines and country-specific parameters for the friction cost approach is recommended if increased application and accuracy of the method is to be realized.

  18. Estimating the costs of AECB regulation

    International Nuclear Information System (INIS)

    1981-04-01

    A comprehensive analysis of the costs to the Canadian nuclear industry of the present Atomic Energy Control Board regulatory activities was carried out to provide a framework for a socio-economic impact analysis of AECB regulations. Regulaory costs in uranium mining and milling, fuel fabrication, power generation, the nuclear fuel cycle as a whole, and radioisotope use are studied. The cost of safety measures which industry would still undertake in the absence of government regulations ('prudent operator' costs) are not included. (L.L.)

  19. Method for developing cost estimates for generic regulatory requirements

    International Nuclear Information System (INIS)

    1985-01-01

    The NRC has established a practice of performing regulatory analyses, reflecting costs as well as benefits, of proposed new or revised generic requirements. A method had been developed to assist the NRC in preparing the types of cost estimates required for this purpose and for assigning priorities in the resolution of generic safety issues. The cost of a generic requirement is defined as the net present value of total lifetime cost incurred by the public, industry, and government in implementing the requirement for all affected plants. The method described here is for commercial light-water-reactor power plants. Estimating the cost for a generic requirement involves several steps: (1) identifying the activities that must be carried out to fully implement the requirement, (2) defining the work packages associated with the major activities, (3) identifying the individual elements of cost for each work package, (4) estimating the magnitude of each cost element, (5) aggregating individual plant costs over the plant lifetime, and (6) aggregating all plant costs and generic costs to produce a total, national, present value of lifetime cost for the requirement. The method developed addresses all six steps. In this paper, we discuss on the first three

  20. Innovation in the pharmaceutical industry: New estimates of R&D costs.

    Science.gov (United States)

    DiMasi, Joseph A; Grabowski, Henry G; Hansen, Ronald W

    2016-05-01

    The research and development costs of 106 randomly selected new drugs were obtained from a survey of 10 pharmaceutical firms. These data were used to estimate the average pre-tax cost of new drug and biologics development. The costs of compounds abandoned during testing were linked to the costs of compounds that obtained marketing approval. The estimated average out-of-pocket cost per approved new compound is $1395 million (2013 dollars). Capitalizing out-of-pocket costs to the point of marketing approval at a real discount rate of 10.5% yields a total pre-approval cost estimate of $2558 million (2013 dollars). When compared to the results of the previous study in this series, total capitalized costs were shown to have increased at an annual rate of 8.5% above general price inflation. Adding an estimate of post-approval R&D costs increases the cost estimate to $2870 million (2013 dollars). Copyright © 2016 Elsevier B.V. All rights reserved.

  1. Estimating pharmacy level prescription drug acquisition costs for third-party reimbursement.

    Science.gov (United States)

    Kreling, D H; Kirk, K W

    1986-07-01

    Accurate payment for the acquisition costs of drug products dispensed is an important consideration in a third-party prescription drug program. Two alternative methods of estimating these costs among pharmacies were derived and compared. First, pharmacists were surveyed to determine the purchase discounts offered to them by wholesalers. A 10.00% modal and 11.35% mean discount resulted for 73 responding pharmacists. Second, cost-plus percents derived from gross profit margins of wholesalers were calculated and applied to wholesaler product costs to estimate pharmacy level acquisition costs. Cost-plus percents derived from National Median and Southwestern Region wholesaler figures were 9.27% and 10.10%, respectively. A comparison showed the two methods of estimating acquisition costs would result in similar acquisition cost estimates. Adopting a cost-plus estimating approach is recommended because it avoids potential pricing manipulations by wholesalers and manufacturers that would negate improvements in drug product reimbursement accuracy.

  2. Estimating the cost of disposal for Canada's nuclear fuel waste

    International Nuclear Information System (INIS)

    Ates, Y.

    1996-07-01

    Atomic Energy of Canada Ltd (AECL) prepared an Environmental Impact Statement and nine supporting Primary Reference Documents on the concept for disposal of Canada's nuclear fuel waste. This report summarizes the basis of the cost estimate which is provided in the primary reference document on engineering for a disposal facility. The scope of the cost estimate is explained by describing the key features of the disposal facility design, by noting the major assumptions made in preparing the estimates, and by listing the included and excluded cost components. An activity-based project planning and control method is explained whereby the project schedule, costs, and personnel requirements are interlinked; forming an integrated perspective on the total project life cycle. The summary and distribution of costs in each project stage by major facility or activity are presented. The results of studies which reviewed the overall cost estimate are also described. These studies indicate that, within the scope, the estimate is reasonable and compares well with similar international studies. (author)

  3. Oil and gas pipeline construction cost analysis and developing regression models for cost estimation

    Science.gov (United States)

    Thaduri, Ravi Kiran

    In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.

  4. Social opportunity cost of capital: empirical estimates

    Energy Technology Data Exchange (ETDEWEB)

    Townsend, S.

    1978-02-01

    This report develops estimates of the social-opportunity cost of public capital. The private and social costs of capital are found to diverge primarily because of the effects of corporate and personal income taxes. Following Harberger, the social-opportunity cost of capital is approximated by a weighted average of the returns to different classes of savers and investors where the weights are the flows of savings or investments in each class multiplied by the relevant elasticity. Estimates of these parameters are obtained and the social-opportunity cost of capital is determined to be in the range of 6.2 to 10.8%, depending upon the parameter values used. Uncertainty is found to affect the social-opportunity cost of capital in two ways. First, some allowance must be made for the chance of failure or at least of not realizing claims of a project's proponents. Second, a particular government project will change the expected variability of the returns to the government's entire portfolio of projects. In the absence of specific information about each project, the use of the economy-wide average default and risk adjustments is suggested. These are included in the empirical estimates reported. International capital markets make available private capital, the price of which is not distorted by the U.S. tax system. The inclusion of foreign sources slightly reduces the social-opportunity cost of capital. 21 references.

  5. Estimating the mental health costs of racial discrimination

    Directory of Open Access Journals (Sweden)

    Amanuel Elias

    2016-11-01

    Full Text Available Abstract Background Racial discrimination is a pervasive social problem in several advanced countries such as the U.S., U.K., and Australia. Public health research also indicates a range of associations between exposure to racial discrimination and negative health, particularly, mental health including depression, anxiety, and post-traumatic stress disorder (PTSD. However, the direct negative health impact of racial discrimination has not been costed so far although economists have previously estimated indirect non-health related productivity costs. In this study, we estimate the burden of disease due to exposure to racial discrimination and measure the cost of this exposure. Methods Using prevalence surveys and data on the association of racial discrimination with health outcomes from a global meta-analysis, we apply a cost of illness method to measure the impact of racial discrimination. This estimate indicates the direct health cost attributable to racial discrimination and we convert the estimates to monetary values based on conventional parameters. Results Racial discrimination costs the Australian economy 235,452 in disability adjusted life years lost, equivalent to $37.9 billion per annum, roughly 3.02% of annual gross domestic product (GDP over 2001–11, indicating a sizeable loss for the economy. Conclusion Substantial cost is incurred due to increased prevalence of racial discrimination as a result of its association with negative health outcomes (e.g. depression, anxiety and PTSD. This implies that potentially significant cost savings can be made through measures that target racial discrimination. Our research contributes to the debate on the social impact of racial discrimination, with implications for policies and efforts addressing it.

  6. Cost estimating Brayton and Stirling engines

    Science.gov (United States)

    Fortgang, H. R.

    1980-01-01

    Brayton and Stirling engines were analyzed for cost and selling price for production quantities ranging from 1000 to 400,000 units per year. Parts and components were subjected to indepth scrutiny to determine optimum manufacturing processes coupled with make or buy decisions on materials and small parts. Tooling and capital equipment costs were estimated for each detail and/or assembly. For low annual production volumes, the Brayton engine appears to have a lower cost and selling price than the Stirling Engine. As annual production quantities increase, the Stirling becomes a lower cost engine than the Brayton. Both engines could benefit cost wise if changes were made in materials, design and manufacturing process as annual production quantities increase.

  7. EVALUATION OF FORWARDER WOOD EXTRACTION COST OF OPERATION

    Directory of Open Access Journals (Sweden)

    Larissa Nunes dos Santos

    2016-03-01

    Full Text Available The objective of this study was to determine the costs of the activity of timber extraction done by forwarders until approximately 30,000 work hours. We used 7 John Deere forwarders, model 1710D with 160 kW engine power. A database provided by a forestry company located in the state of Minas Gerais was used, containing all the information necessary for calculating the operating cost of the machines and for the subsequent sensitivity analysis. The operating cost was obtained by the sum of the fixed and variable costs. For the sensitivity analysis a variation ± 20% of the most representative elements of the total cost of the machine was performed. The result obtained for the average operating cost of the forwarder was US$ 147.80 h-1. Costs for repairs and maintenance, labor, fuel, and depreciation represented approximately 90% of the total cost of the machine. A 10% reduction in their values resulted in a savings of approximately 9% in all years evaluated.

  8. Cost estimation and management over the life cycle of metallurgical ...

    African Journals Online (AJOL)

    This study investigates whether all expected costs over the life cycle of metallurgical research projects are included in initial, normal and fi nal cost estimates, and whether these costs are managed throughout a project's life cycle since there is not enough emphasis on the accurate estimation of costs and their management ...

  9. Cost Estimates and Investment Decisions

    International Nuclear Information System (INIS)

    Emhjellen, Kjetil; Emhjellen Magne; Osmundsen, Petter

    2001-08-01

    When evaluating new investment projects, oil companies traditionally use the discounted cashflow method. This method requires expected cashflows in the numerator and a risk adjusted required rate of return in the denominator in order to calculate net present value. The capital expenditure (CAPEX) of a project is one of the major cashflows used to calculate net present value. Usually the CAPEX is given by a single cost figure, with some indication of its probability distribution. In the oil industry and many other industries, it is common practice to report a CAPEX that is the estimated 50/50 (median) CAPEX instead of the estimated expected (expected value) CAPEX. In this article we demonstrate how the practice of using a 50/50 (median) CAPEX, when the cost distributions are asymmetric, causes project valuation errors and therefore may lead to wrong investment decisions with acceptance of projects that have negative net present values. (author)

  10. Preliminary estimate of the costs involved in the implantation of a low and medium level radioactive waste repository in Brazil

    International Nuclear Information System (INIS)

    Branco, Otavio E.A.; Carvalho Filho, Carlos A.; Ferreira, Vinicius V.M.; Alves, Paulo R.R.

    2009-01-01

    One relevant subject in the decision making process linked to the implantation of a low and intermediate level waste (LILW) repository in Brazil is regarding to the project expected costs. It is important to estimate in a solid way the total and partial costs expected, considering each one of the enterprise implantation phases. This work shows an initial estimative of these costs, based on reports and papers that evaluate the implantation, operation, closure and post closure costs of radioactive LILW waste repositories. In the development of this research only the costs regarding to near surface repositories, or similar ones, were considered. The total cost was estimated as approximately 115 million dollars, considering the whole project lifetime as 300 years. Considering the repository start-up costs (site selection, licensing, project and construction), the total value is estimated as 48 million dollars (1600 dollars/m 3 ). It is important to emphasize that some cares should be taken when costs obtained from the acquired experience by another countries in the repositories development are analyzed. As example, the costs for disposal 1 m 3 of low and medium level radioactive waste vary significantly from one country to another, even when repositories with similar projects are compared. Also the total costs of construction and licensing are significantly higher when compared those ones from 'conventional' facilities with similar technological characteristics. Finally, although about a dozen low and medium level radioactive waste repository are operating in Europe, new projects should be faced, as the international practice demonstrate, as original developments. (author)

  11. Costs and indices for domestic oil and gas field equipment and production operations 1994 through 1997

    International Nuclear Information System (INIS)

    1998-03-01

    This report presents estimated costs and cost indices for domestic oil and natural gas field equipment and production operations for 1994, 1995, 1996, and 1997. The costs of all equipment and services are those in effect during June of each year. The sums (aggregates) of the costs for representative leases by region, depth, and production rate were averaged and indexed. This provides a general measure of the increased or decreased costs from year to year for lease equipment and operations. These general measures do not capture changes in industry-wide costs exactly because of annual variations in the ratio of the total number of oil wells to the total number of gas wells. The detail provided in this report is unavailable elsewhere. The body of this report contains summary tables, and the appendices contain detailed tables. Price changes for oil and gas, changes in taxes on oil and gas revenues, and environmental factors (compliance costs and lease availability) have a significant impact on the number and cost of oil and gas wells drilled. These changes also impact the cost of oil and gas equipment and production operations

  12. 48 CFR 1852.216-84 - Estimated cost and incentive fee.

    Science.gov (United States)

    2010-10-01

    ... Provisions and Clauses 1852.216-84 Estimated cost and incentive fee. As prescribed in 1816.406-70(d), insert the following clause: Estimated Cost and Incentive Fee (OCT 1996) The target cost of this contract is $___. The target fee of this contract is $___. The total target cost and target fee as contemplated by the...

  13. Estimating the Cost of Providing Foundational Public Health Services.

    Science.gov (United States)

    Mamaril, Cezar Brian C; Mays, Glen P; Branham, Douglas Keith; Bekemeier, Betty; Marlowe, Justin; Timsina, Lava

    2017-12-28

    To estimate the cost of resources required to implement a set of Foundational Public Health Services (FPHS) as recommended by the Institute of Medicine. A stochastic simulation model was used to generate probability distributions of input and output costs across 11 FPHS domains. We used an implementation attainment scale to estimate costs of fully implementing FPHS. We use data collected from a diverse cohort of 19 public health agencies located in three states that implemented the FPHS cost estimation methodology in their agencies during 2014-2015. The average agency incurred costs of $48 per capita implementing FPHS at their current attainment levels with a coefficient of variation (CV) of 16 percent. Achieving full FPHS implementation would require $82 per capita (CV=19 percent), indicating an estimated resource gap of $34 per capita. Substantial variation in costs exists across communities in resources currently devoted to implementing FPHS, with even larger variation in resources needed for full attainment. Reducing geographic inequities in FPHS may require novel financing mechanisms and delivery models that allow health agencies to have robust roles within the health system and realize a minimum package of public health services for the nation. © Health Research and Educational Trust.

  14. Comparing Methods for Estimating Direct Costs of Adverse Drug Events.

    Science.gov (United States)

    Gyllensten, Hanna; Jönsson, Anna K; Hakkarainen, Katja M; Svensson, Staffan; Hägg, Staffan; Rehnberg, Clas

    2017-12-01

    To estimate how direct health care costs resulting from adverse drug events (ADEs) and cost distribution are affected by methodological decisions regarding identification of ADEs, assigning relevant resource use to ADEs, and estimating costs for the assigned resources. ADEs were identified from medical records and diagnostic codes for a random sample of 4970 Swedish adults during a 3-month study period in 2008 and were assessed for causality. Results were compared for five cost evaluation methods, including different methods for identifying ADEs, assigning resource use to ADEs, and for estimating costs for the assigned resources (resource use method, proportion of registered cost method, unit cost method, diagnostic code method, and main diagnosis method). Different levels of causality for ADEs and ADEs' contribution to health care resource use were considered. Using the five methods, the maximum estimated overall direct health care costs resulting from ADEs ranged from Sk10,000 (Sk = Swedish krona; ~€1,500 in 2016 values) using the diagnostic code method to more than Sk3,000,000 (~€414,000) using the unit cost method in our study population. The most conservative definitions for ADEs' contribution to health care resource use and the causality of ADEs resulted in average costs per patient ranging from Sk0 using the diagnostic code method to Sk4066 (~€500) using the unit cost method. The estimated costs resulting from ADEs varied considerably depending on the methodological choices. The results indicate that costs for ADEs need to be identified through medical record review and by using detailed unit cost data. Copyright © 2017 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  15. Cost estimate of the Yucca Mountain repository based on the site characterization plan conceptual design: Nevada Nuclear Waste Storage Investigations Project

    International Nuclear Information System (INIS)

    Gruer, E.R.; Fowler, M.E.; Rocha, G.A.

    1987-06-01

    This report of the life-cycle costs of a mined repository in tuff is based on the site characterization conceptual design and contains estimates of two methods of waste emplacement - vertical and horizontal. The life cycle of the repository progresses from design and construction to emplacement operations that last 25 years. When emplacement has ended, a caretaker period begins and continues until 50 years from emplacement of the first waste. The life of the repository concludes with closure and decommissioning, which includes backfilling and sealing the repository, decontaminating and razing the surface facilities, restoring the land to as near its original condition as possible, and marking the site. The estimates, developed for each phase of the life cycle of the repository, are based on January 1986 constant (unescalated) dollars and include an allowance for contingency. This report mainly comprises explanations of design and operating assumptions, estimating methods, exclusions, definition of cost accounts, calculating procedures, data sources, staffing and other qualifying remarks. Cost estimates are approximations of value and should not be construed as exact. The cost and staffing detail provided in this estimate is commensurate with the detail in the conceptual design

  16. Estimating remediation costs for the Montclair radium superfund sites

    International Nuclear Information System (INIS)

    Turner, M.J.

    1995-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essex County, NJ, are contaminated to varying degrees with radioactive materials. The waste originated from radium processing facilities prevalent in the area during the early 1900s. The design for remediation of these sites is managed by Bechtel National, Inc. on behalf of the United States Army Corps of Engineers, Kansas City District, which administers the project through an interagency agreement with the US Environmental Protection Agency (EPA). Design efforts for the project began in 1990. A portion of the scope, which is the topic of this article, was preparing the remediation costs estimates. These estimates were to be prepared from the detailed design packages; the Corps of Engineers required that the estimates were prepared using the Micro Computer-Aided Cost Estimating System (MCACES). This article discusses the design methods used, provides an overview of MCACES, and discusses the structure and preparation of the cost estimate and its uses. However, the main focus of the article is the methods used to generate the required project-specific cost estimate format for this project. 6 figs

  17. Production Functions for Water Delivery Systems: Analysis and Estimation Using Dual Cost Function and Implicit Price Specifications

    Science.gov (United States)

    Teeples, Ronald; Glyer, David

    1987-05-01

    Both policy and technical analysis of water delivery systems have been based on cost functions that are inconsistent with or are incomplete representations of the neoclassical production functions of economics. We present a full-featured production function model of water delivery which can be estimated from a multiproduct, dual cost function. The model features implicit prices for own-water inputs and is implemented as a jointly estimated system of input share equations and a translog cost function. Likelihood ratio tests are performed showing that a minimally constrained, full-featured production function is a necessary specification of the water delivery operations in our sample. This, plus the model's highly efficient and economically correct parameter estimates, confirms the usefulness of a production function approach to modeling the economic activities of water delivery systems.

  18. Cost estimate of bovine tuberculosis to Ethiopia.

    Science.gov (United States)

    Tschopp, Rea; Hattendorf, Jan; Roth, Felix; Choudhury, Adnan Ali Khan; Choudhoury, Adnan; Shaw, Alexandra; Aseffa, Abraham; Zinsstag, Jakob

    2013-01-01

    While bovine tuberculosis (BTB) has been eliminated in some industrialized countries, it prevails worldwide, particularly in Africa. In Ethiopia, BTB is prevalent as numerous studies have shown its occurrence in livestock and in abattoirs but it has not been demonstrated in wildlife and only very few cases have been found in humans. The objective of this study is to estimate the cost of BTB to Ethiopia with the aim of informing Ethiopian policy on options for BTB control. BTB in livestock affects both animal productivity and herd demographic composition. The Livestock Development Planning System (LDPS2, FAO) was modified to allow for stochastic simulation of parameters. We performed an incremental cost of disease analysis, comparing livestock production with and without BTB. For the rural scenario we considered an endemically stable 4 % comparative intradermal test (CIDT) prevalence and for the urban scenario an endemically stable 32 % CIDT prevalence among cattle. The net present value of rural Ethiopian livestock products in 2005 is estimated at 65.7 billion (thousand million) Ethiopian Birr (95 % Confidence Interval (CI) 53.8-77.7 billion Birr), which is the equivalent of 7.5 billion US$ (95 %CI 6.1-8.9 billion US$) at a rate of 8.7 Birr per US$ in 2005. The cost of BTB ranges from 646 million Birr (75.2 million US$) in 2005 to 3.1 Billion Birr in 2011 (358 million US$) but is within the range of uncertainty of our estimate and can thus not be distinguished from zero. The cost of disease in the urban livestock production ranges from 5 to 42 million Birr (500,000-4.9 million US$) between 2005 and 2011 but is also within the range of uncertainty of our estimate. Our study shows no measurable loss in asset value or cost of disease due to BTB in rural and urban production systems in Ethiopia. This does not mean that there is not a real cost of disease, but the variability of the productivity parameters and prices are high and would require more precise estimates

  19. An improved COCOMO software cost estimation model | Duke ...

    African Journals Online (AJOL)

    In this paper, we discuss the methodologies adopted previously in software cost estimation using the COnstructive COst MOdels (COCOMOs). From our analysis, COCOMOs produce very high software development efforts, which eventually produce high software development costs. Consequently, we propose its extension, ...

  20. US nuclear power plant operating cost and experience summaries

    International Nuclear Information System (INIS)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov)

  1. US nuclear power plant operating cost and experience summaries

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

  2. Reducing Inventory System Costs by Using Robust Demand Estimators

    OpenAIRE

    Raymond A. Jacobs; Harvey M. Wagner

    1989-01-01

    Applications of inventory theory typically use historical data to estimate demand distribution parameters. Imprecise knowledge of the demand distribution adds to the usual replenishment costs associated with stochastic demands. Only limited research has been directed at the problem of choosing cost effective statistical procedures for estimating these parameters. Available theoretical findings on estimating the demand parameters for (s, S) inventory replenishment policies are limited by their...

  3. The unit cost factors and calculation methods for decommissioning - Cost estimation of nuclear research facilities

    International Nuclear Information System (INIS)

    Kwan-Seong Jeong; Dong-Gyu Lee; Chong-Hun Jung; Kune-Woo Lee

    2007-01-01

    Available in abstract form only. Full text of publication follows: The uncertainties of decommissioning costs increase high due to several conditions. Decommissioning cost estimation depends on the complexity of nuclear installations, its site-specific physical and radiological inventories. Therefore, the decommissioning costs of nuclear research facilities must be estimated in accordance with the detailed sub-tasks and resources by the tasks of decommissioning activities. By selecting the classified activities and resources, costs are calculated by the items and then the total costs of all decommissioning activities are reshuffled to match with its usage and objectives. And the decommissioning cost of nuclear research facilities is calculated by applying a unit cost factor method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning costs of nuclear research facilities are composed of labor cost, equipment and materials cost. Of these three categorical costs, the calculation of labor costs are very important because decommissioning activities mainly depend on labor force. Labor costs in decommissioning activities are calculated on the basis of working time consumed in decommissioning objects and works. The working times are figured out of unit cost factors and work difficulty factors. Finally, labor costs are figured out by using these factors as parameters of calculation. The accuracy of decommissioning cost estimation results is much higher compared to the real decommissioning works. (authors)

  4. [Methodologies for estimating the indirect costs of traffic accidents].

    Science.gov (United States)

    Carozzi, Soledad; Elorza, María Eugenia; Moscoso, Nebel Silvana; Ripari, Nadia Vanina

    2017-01-01

    Traffic accidents generate multiple costs to society, including those associated with the loss of productivity. However, there is no consensus about the most appropriate methodology for estimating those costs. The aim of this study was to review methods for estimating indirect costs applied in crash cost studies. A thematic review of the literature was carried out between 1995 and 2012 in PubMed with the terms cost of illness, indirect cost, road traffic injuries, productivity loss. For the assessment of costs we used the the human capital method, on the basis of the wage-income lost during the time of treatment and recovery of patients and caregivers. In the case of premature death or total disability, the discount rate was applied to obtain the present value of lost future earnings. The computed years arose by subtracting to life expectancy at birth the average age of those affected who are not incorporated into the economically active life. The interest in minimizing the problem is reflected in the evolution of the implemented methodologies. We expect that this review is useful to estimate efficiently the real indirect costs of traffic accidents.

  5. Contrast in low-cost operational concepts for orbiting satellites

    Science.gov (United States)

    Walyus, Keith D.; Reis, James; Bradley, Arthur J.

    2002-12-01

    Older spacecraft missions, especially those in low Earth orbit with telemetry intensive requirements, required round-the-clock control center staffing. The state of technology relied on control center personnel to continually examine data, make decisions, resolve anomalies, and file reports. Hubble Space Telescope (HST) is a prime example of this description. Technological advancements in hardware and software over the last decade have yielded increases in productivity and operational efficiency, which result in lower cost. The re-engineering effort of HST, which has recently concluded, utilized emerging technology to reduce cost and increase productivity. New missions, of which NASA's Transition Region and Coronal Explorer Satellite (TRACE) is an example, have benefited from recent technological advancements and are more cost-effective than when HST was first launched. During its launch (1998) and early orbit phase, the TRACE Flight Operations Team (FOT) employed continually staffed operations. Yet once the mission entered its nominal phase, the FOT reduced their staffing to standard weekday business hours. Operations were still conducted at night and during the weekends, but these operations occurred autonomously without compromising their high standards for data collections. For the HST, which launched in 1990, reduced cost operations will employ a different operational concept, when the spacecraft enters its low-cost phase after its final servicing mission in 2004. Primarily due to the spacecraft"s design, the HST Project has determined that single-shift operations will introduce unacceptable risks for the amount of dollars saved. More importantly, significant cost-savings can still be achieved by changing the operational concept for the FOT, while still maintaining round-the-clock staffing. It"s important to note that the low-cost solutions obtained for one satellite may not be applicable for other satellites. This paper will contrast the differences between

  6. Integrated approach to optimize operation and maintenance costs for operating nuclear power plants

    International Nuclear Information System (INIS)

    2006-06-01

    In the context of increasingly open electricity markets and the 'unbundling' of generating companies from former utility monopolies, an area of major concern is the economic performance of the existing fleet of nuclear power plants. Nuclear power, inevitably, must compete directly with other electricity generation sources. Coping with this competitive pressure is a challenge that the nuclear industry should meet if the nuclear option is to remain a viable one. This competitive environment has significant implications for nuclear plant operations, including, among others, the need for the more cost effective management of plant activities, and the greater use of analytical tools to balance the costs and benefits of proposed activities, in order to optimize operation and maintenance costs, and thus insure the economic competitiveness of existing nuclear power plants. In the framework of the activities on Nuclear Economic Performance Information System (NEPIS), the IAEA embarked in developing guidance on optimization of operation and maintenance costs for nuclear power plants. The report was prepared building on the fundamental that optimization of operation and maintenance costs of a nuclear power plant is a key component of a broader integrated business strategic planning process, having as overall result achievement of organization's business objectives. It provides advice on optimization of O and M costs in the framework of strategic business planning, with additional details on operational planning and controlling. This TECDOC was elaborated in 2004-2005 in the framework of the IAEA's programme on Nuclear Power Plant Operating Performance and Life Cycle Management, with the support of two consultants meetings and one technical meeting and based on contributions provided by participants. It can serve as a useful reference for the management and operation staff within utilities, nuclear power plant operators and regulators and other organizations involved in

  7. AES, Automated Construction Cost Estimation System

    International Nuclear Information System (INIS)

    Holder, D.A.

    1995-01-01

    A - Description of program or function: AES (Automated Estimating System) enters and updates the detailed cost, schedule, contingency, and escalation information contained in a typical construction or other project cost estimates. It combines this information to calculate both un-escalated and escalated and cash flow values for the project. These costs can be reported at varying levels of detail. AES differs from previous versions in at least the following ways: The schedule is entered at the WBS-Participant, Activity level - multiple activities can be assigned to each WBS-Participant combination; the spending curve is defined at the schedule activity level and a weighing factor is defined which determines percentage of cost for the WBS-Participant applied to the schedule activity; Schedule by days instead of Fiscal Year/Quarter; Sales Tax is applied at the Line Item Level- a sales tax codes is selected to indicate Material, Large Single Item, or Professional Services; a 'data filter' has been added to allow user to define data the report is to be generated for. B - Method of solution: Average Escalation Rate: The average escalation for a Bill of is calculated in three steps. 1. A table of quarterly escalation factors is calculated based on the base fiscal year and quarter of the project entered in the estimate record and the annual escalation rates entered in the Standard Value File. 2. The percentage distribution of costs by quarter for the Bill of Material is calculated based on the schedule entered and the curve type. 3. The percent in each fiscal year and quarter in the distribution is multiplied by the escalation factor for the fiscal year and quarter. The sum of these results is the average escalation rate for that Bill of Material. Schedule by curve: The allocation of costs to specific time periods is dependent on three inputs, starting schedule date, ending schedule date, and the percentage of costs allocated to each quarter. Contingency Analysis: The

  8. Structural Estimation of Stock Market Participation Costs

    DEFF Research Database (Denmark)

    Khorunzhina, Natalia

    2013-01-01

    education programs can affect consumers' investment decisions. Using household data from the Panel Study of Income Dynamics, I estimate the magnitude of the participation cost, allowing for individual heterogeneity in it. The results show the average stock market participation cost is about 4–6% of labor...

  9. An analysis of nuclear plant operating costs: A 1991 update

    International Nuclear Information System (INIS)

    1991-05-01

    This report updates a 1988 Energy Information Administration (EIA) report which examined trends in nonfuel operating costs at the Nation's nuclear power plants. Nonfuel operating costs are comprised of operating and maintenance (O ampersand M) costs and capital expenditures incurred after a plant begins operating. Capital expenditures are typically called ''capital additions'' because the costs are added to the utility's rate base and recovered as a depreciation expense over several years, the number of years being regulated by State Public Utility Commissions. These costs consist of large maintenance expenditures needed to keep a plant operational as well as those needed to make plant modifications mandated by the Nuclear Regulatory Commission (NRC) or implemented at the utility's discretion. The 1988 report found that from 1974 through 1984, the last year for which data were available, nuclear power plant nonfuel operating costs escalated by 14 percent annually in real terms. The objective of the present study was to determine whether trends in nonfuel operating costs have changed since 1984, if there was any change in the underlying factors influencing these costs, and if so, how these changes affect the basic conclusions of the 1988 report. The general trends are encouraging: Total nonfuel operating costs peaked in 1984 and have been lower since that time; O ampersand M costs have been rising, but at a much lower rate than seen from 1974 through 1984; capital additions costs have actually been declining. 9 figs., 12 tabs

  10. Cost estimation: An expert-opinion approach. [cost analysis of research projects using the Delphi method (forecasting)

    Science.gov (United States)

    Buffalano, C.; Fogleman, S.; Gielecki, M.

    1976-01-01

    A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

  11. Cost of enlarged operating zone for an existing Francis runner

    Science.gov (United States)

    Monette, Christine; Marmont, Hugues; Chamberland-Lauzon, Joël; Skagerstrand, Anders; Coutu, André; Carlevi, Jens

    2016-11-01

    Traditionally, hydro power plants have been operated close to best efficiency point, the more stable operating condition for which they have been designed. However, because of changes in the electricity market, many hydro power plants operators wish to operate their machines differently to fulfil those new market needs. New operating conditions can include whole range operation, many start/stops, extensive low load operation, synchronous condenser mode and power/frequency regulation. Many of these new operating conditions may impose more severe fatigue damage than the traditional base load operation close to best efficiency point. Under these conditions, the fatigue life of the runner may be significantly reduced and reparation or replacement cost might occur sooner than expected. In order to design reliable Francis runners for those new challenging operating scenarios, Andritz Hydro has developed various proprietary tools and design rules. These are used within Andritz Hydro to design mechanically robust Francis runners for the operating scenarios fulfilling customer's specifications. To estimate residual life under different operating scenarios of an existing runner designed years ago for best efficiency base load operation, Andritz Hydro's design rules and tools would necessarily lead to conservative results. While the geometry of a new runner can be modified to fulfil all conservative mechanical design rules, the predicted fatigue life of an existing runner under off-design operating conditions may appear rather short because of the conservative safety factor included in the calculations. The most precise and reliable way to calculate residual life of an existing runner under different operating scenarios is to perform a strain gauge measurement campaign on the runner. This paper presents the runner strain gage measurement campaign of a mid-head Francis turbine over all the operating conditions available during the test, the analysis of the measurement signals

  12. Methods of projecting operations and maintenance costs for nuclear power plants

    International Nuclear Information System (INIS)

    1995-01-01

    Operations and maintenance cost (OMC) had increased its relative importance to the total generation cost for future nuclear power stations, according to the latest update of the OECD Nuclear Energy Agency (NEA) study on Projected Costs of Generating Electricity (EGC studies). OMC is some 20 to 30% of total generation cost for future nuclear power stations in most NEA member countries. However, nuclear OMC that countries projected in the latest EGC study are spread over a wide range, from 5 to 16 US mills/kWh. In order to understand better the reasons for this wide diversity in nuclear OMC projections, the NEA set up an Expert Group. The focus of this study was on projected OMC that were reported in the past EGC studies, but the Group studied actual OMC experienced from existing units, because knowledge or experience concerning actual OMC certainly influences the choice of assumptions or calculation procedure for estimating OMC for future plants. Cost informations from 14 NEA countries have been analysed on the basis of a standardized framework of detailed components of OMC costs. The rationale for different OMC cost projections reported in previous NEA studies on generation cost is discussed and suggestions are made for future studies on both generation cost and OMC cost. Despite the methodological approach and the reduced extent of differences when excluding exceptional figures, it was not possible fully to clarify the origins and to understand the remaining differences in OMC figures. Several countries which have a long and a good experience of operating nuclear units did not provide sufficient detailed data or did not provide any quantitative data at all. (J.S.). 14 refs., 5 figs., 19 tabs., 4 annexes

  13. Cost related sensitivity analysis for optimal operation of a grid-parallel PEM fuel cell power plant

    Science.gov (United States)

    El-Sharkh, M. Y.; Tanrioven, M.; Rahman, A.; Alam, M. S.

    Fuel cell power plants (FCPP) as a combined source of heat, power and hydrogen (CHP&H) can be considered as a potential option to supply both thermal and electrical loads. Hydrogen produced from the FCPP can be stored for future use of the FCPP or can be sold for profit. In such a system, tariff rates for purchasing or selling electricity, the fuel cost for the FCPP/thermal load, and hydrogen selling price are the main factors that affect the operational strategy. This paper presents a hybrid evolutionary programming and Hill-Climbing based approach to evaluate the impact of change of the above mentioned cost parameters on the optimal operational strategy of the FCPP. The optimal operational strategy of the FCPP for different tariffs is achieved through the estimation of the following: hourly generated power, the amount of thermal power recovered, power trade with the local grid, and the quantity of hydrogen that can be produced. Results show the importance of optimizing system cost parameters in order to minimize overall operating cost.

  14. Computerized operating cost model for industrial steam generation

    Energy Technology Data Exchange (ETDEWEB)

    Powers, T.D.

    1983-02-01

    Pending EPA regulations, establishing revised emission levels for industrial boilers are perceived to have an effect on the relative costs of steam production technologies. To aid in the comparison of competitive boiler technologies, the Steam Cost Code was developed which provides levelized steam costs reflecting the effects of a number of key steam cost parameters. The Steam Cost Code is a user interactive FORTRAN program designed to operate on a VAX computer system. The program requires the user to input a number of variables describing the design characteristics, capital costs, and operating conditions for a specific boiler system. Part of the input to the Steam Cost Code is the capital cost of the steam production system. The capital cost is obtained from a program called INDCEPT, developed by Oak Ridge National Laboratory under Department of Energy, Morgantown Energy Technology Center sponsorship.

  15. Estimated costs of treatment of benign prostate hyperplasia in Brazil

    Directory of Open Access Journals (Sweden)

    Haylton J. Suaid

    2003-06-01

    that the treatment of BPH in a not-so-far future can become a public health problem for Brazilian society, since the current estimate would be, approximately, costs around 2.26 - 3.83 billion dollars, added by the yearly increase in the risk population (24.99% for the group under medical treatment and over the non-operated amount of the surgical group.

  16. Time-driven activity-based costing to estimate cost of care at multidisciplinary aerodigestive centers.

    Science.gov (United States)

    Garcia, Jordan A; Mistry, Bipin; Hardy, Stephen; Fracchia, Mary Shannon; Hersh, Cheryl; Wentland, Carissa; Vadakekalam, Joseph; Kaplan, Robert; Hartnick, Christopher J

    2017-09-01

    Providing high-value healthcare to patients is increasingly becoming an objective for providers including those at multidisciplinary aerodigestive centers. Measuring value has two components: 1) identify relevant health outcomes and 2) determine relevant treatment costs. Via their inherent structure, multidisciplinary care units consolidate care for complex patients. However, their potential impact on decreasing healthcare costs is less clear. The goal of this study was to estimate the potential cost savings of treating patients with laryngeal clefts at multidisciplinary aerodigestive centers. Retrospective chart review. Time-driven activity-based costing was used to estimate the cost of care for patients with laryngeal cleft seen between 2008 and 2013 at the Massachusetts Eye and Ear Infirmary Pediatric Aerodigestive Center. Retrospective chart review was performed to identify clinic utilization by patients as well as patient diet outcomes after treatment. Patients were stratified into neurologically complex and neurologically noncomplex groups. The cost of care for patients requiring surgical intervention was five and three times as expensive of the cost of care for patients not requiring surgery for neurologically noncomplex and complex patients, respectively. Following treatment, 50% and 55% of complex and noncomplex patients returned to normal diet, whereas 83% and 87% of patients experienced improved diets, respectively. Additionally, multidisciplinary team-based care for children with laryngeal clefts potentially achieves 20% to 40% cost savings. These findings demonstrate how time-driven activity-based costing can be used to estimate and compare patient costs in multidisciplinary aerodigestive centers. 2c. Laryngoscope, 127:2152-2158, 2017. © 2017 The American Laryngological, Rhinological and Otological Society, Inc.

  17. Cost analysis of small hydroelectric power plants components and preliminary estimation of global cost

    International Nuclear Information System (INIS)

    Basta, C.; Olive, W.J.; Antunes, J.S.

    1990-01-01

    An analysis of cost for each components of Small Hydroelectric Power Plant, taking into account the real costs of these projects is shown. It also presents a global equation which allows a preliminary estimation of cost for each construction. (author)

  18. Robust motion estimation using connected operators

    OpenAIRE

    Salembier Clairon, Philippe Jean; Sanson, H

    1997-01-01

    This paper discusses the use of connected operators for robust motion estimation The proposed strategy involves a motion estimation step extracting the dominant motion and a ltering step relying on connected operators that remove objects that do not fol low the dominant motion. These two steps are iterated in order to obtain an accurate motion estimation and a precise de nition of the objects fol lowing this motion This strategy can be applied on the entire frame or on individual connected c...

  19. Taking the Evolutionary Road to Developing an In-House Cost Estimate

    Science.gov (United States)

    Jacintho, David; Esker, Lind; Herman, Frank; Lavaque, Rodolfo; Regardie, Myma

    2011-01-01

    This slide presentation reviews the process and some of the problems and challenges of developing an In-House Cost Estimate (IHCE). Using as an example the Space Network Ground Segment Sustainment (SGSS) project, the presentation reviews the phases for developing a Cost estimate within the project to estimate government and contractor project costs to support a budget request.

  20. AP1000 construction and operating costs

    International Nuclear Information System (INIS)

    Winters, J.W.; Corletti, M.M.; Thompson, M.

    2001-01-01

    Market analysis of the U.S. electricity generating market indicates that the generating cost of competitive new generating capacity must be less than $0.03/kw-hr. When such factors as an attractive return on investment and payback period are considered for a new nuclear electric generating facility, this results in the requirement to have an overnight capital cost of approximately $1000/kw. Industry executives indicate that any new nuclear plant must be able to compete in the de-regulated generation wholesale marketplace and provide a return to the shareholders. Against this standard, the costs of advanced nuclear power plants currently available are still too high. In the United States, the Utility Requirements Document for advanced light water reactor plants included a cost goal that was based on the cost of coal generated electricity at the time the document was written. Since that time, the cost of new generating capacity and the overall operating cost of generating electricity has gone down. This is a result of low natural gas prices, more efficient plants in general and the current record breaking reductions in outage times and operating costs for nuclear plants. The plant designs resulting from the United States advanced light water reactor plant programs received Design Certification from the United States Nuclear Regulatory Commission. Some are being deployed, with variations, in countries other than the United States. But they can not compete today with other sources of central station generation in the United States. (author)

  1. AP1000 construction and operating costs

    Energy Technology Data Exchange (ETDEWEB)

    Winters, J.W.; Corletti, M.M. [Westinghouse Electric Corp., Pittsburgh, PA (United States); Thompson, M

    2001-07-01

    Market analysis of the U.S. electricity generating market indicates that the generating cost of competitive new generating capacity must be less than $0.03/kw-hr. When such factors as an attractive return on investment and payback period are considered for a new nuclear electric generating facility, this results in the requirement to have an overnight capital cost of approximately $1000/kw. Industry executives indicate that any new nuclear plant must be able to compete in the de-regulated generation wholesale marketplace and provide a return to the shareholders. Against this standard, the costs of advanced nuclear power plants currently available are still too high. In the United States, the Utility Requirements Document for advanced light water reactor plants included a cost goal that was based on the cost of coal generated electricity at the time the document was written. Since that time, the cost of new generating capacity and the overall operating cost of generating electricity has gone down. This is a result of low natural gas prices, more efficient plants in general and the current record breaking reductions in outage times and operating costs for nuclear plants. The plant designs resulting from the United States advanced light water reactor plant programs received Design Certification from the United States Nuclear Regulatory Commission. Some are being deployed, with variations, in countries other than the United States. But they can not compete today with other sources of central station generation in the United States. (author)

  2. Operations and maintenance costs - Selected observations

    International Nuclear Information System (INIS)

    Kirk, M.W.

    1991-01-01

    The operations and maintenance (O and M) costs associated with nuclear power plants have been rising continuously over the past decade. The Nuclear Management and Resources Council (NUMARC) has undertaken an examination of this issue to determine what components of O and M costs are driven by regulatory activity. Observers from various perspectives within the nuclear industry have cited staffing, outages, training, and management structure among others as large contributors to O and M costs. NUMARC is currently analyzing utility cost data to isolate the regulatory components for further action

  3. Operations and support cost modeling of conceptual space vehicles

    Science.gov (United States)

    Ebeling, Charles

    1994-01-01

    The University of Dayton is pleased to submit this annual report to the National Aeronautics and Space Administration (NASA) Langley Research Center which documents the development of an operations and support (O&S) cost model as part of a larger life cycle cost (LCC) structure. It is intended for use during the conceptual design of new launch vehicles and spacecraft. This research is being conducted under NASA Research Grant NAG-1-1327. This research effort changes the focus from that of the first two years in which a reliability and maintainability model was developed to the initial development of an operations and support life cycle cost model. Cost categories were initially patterned after NASA's three axis work breakdown structure consisting of a configuration axis (vehicle), a function axis, and a cost axis. A revised cost element structure (CES), which is currently under study by NASA, was used to established the basic cost elements used in the model. While the focus of the effort was on operations and maintenance costs and other recurring costs, the computerized model allowed for other cost categories such as RDT&E and production costs to be addressed. Secondary tasks performed concurrent with the development of the costing model included support and upgrades to the reliability and maintainability (R&M) model. The primary result of the current research has been a methodology and a computer implementation of the methodology to provide for timely operations and support cost analysis during the conceptual design activities.

  4. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  5. The Acquisition Cost-Estimating Workforce. Census and Characteristics

    Science.gov (United States)

    2009-01-01

    Abbreviations AAC Air Armament Center ACAT acquisition category ACEIT Automated Cost Estimating Integrated Tools AF Air Force AFB Air Force Base AFCAA Air...3 3 4 Automated Cost Estimating Integrated Tools ( ACEIT ) 0 1 12 6 Tecolotea training 0 0 10 5 Other 3 13 24 18 No training 18 4 29 18 Total 100 100...other sources, including AFIT, ACEIT ,9 or the contracting agency that employed them. The remain- ing 29 percent reported having received no training

  6. 48 CFR 2452.216-70 - Estimated cost, base fee and award fee.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Estimated cost, base fee... Provisions and Clauses 2452.216-70 Estimated cost, base fee and award fee. As prescribed in 2416.406(e)(1), insert the following clause in all cost-plus-award-fee contracts: Estimated Cost, Base Fee and Award Fee...

  7. Counting the cost: estimating the economic benefit of pedophile treatment programs.

    Science.gov (United States)

    Shanahan, M; Donato, R

    2001-04-01

    The principal objective of this paper is to identify the economic costs and benefits of pedophile treatment programs incorporating both the tangible and intangible cost of sexual abuse to victims. Cost estimates of cognitive behavioral therapy programs in Australian prisons are compared against the tangible and intangible costs to victims of being sexually abused. Estimates are prepared that take into account a number of problematic issues. These include the range of possible recidivism rates for treatment programs; the uncertainty surrounding the number of child sexual molestation offences committed by recidivists; and the methodological problems associated with estimating the intangible costs of sexual abuse on victims. Despite the variation in parameter estimates that impact on the cost-benefit analysis of pedophile treatment programs, it is found that potential range of economic costs from child sexual abuse are substantial and the economic benefits to be derived from appropriate and effective treatment programs are high. Based on a reasonable set of parameter estimates, in-prison, cognitive therapy treatment programs for pedophiles are likely to be of net benefit to society. Despite this, a critical area of future research must include further methodological developments in estimating the quantitative impact of child sexual abuse in the community.

  8. A generic tool for cost estimating in aircraft design

    NARCIS (Netherlands)

    Castagne, S.; Curran, R.; Rothwell, A.; Price, M.; Benard, E.; Raghunathan, S.

    2008-01-01

    A methodology to estimate the cost implications of design decisions by integrating cost as a design parameter at an early design stage is presented. The model is developed on a hierarchical basis, the manufacturing cost of aircraft fuselage panels being analysed in this paper. The manufacturing cost

  9. Fusion reactor design studies: standard unit costs and cost scaling rules

    International Nuclear Information System (INIS)

    Schulte, S.C.; Bickford, W.E.; Willingham, C.E.; Ghose, S.K.; Walker, M.G.

    1979-09-01

    This report establishes standard unit costs and scaling rules for estimating costs of material, equipment, land, and labor components used in magnetic confinement fusion reactor plant construction and operation. Use of the standard unit costs and scaling rules will add uniformity to cost estimates, and thus allow valid comparison of the economic characteristics of various reactor concepts

  10. BIM – New rules of measurement ontology for construction cost estimation

    Directory of Open Access Journals (Sweden)

    F.H. Abanda

    2017-04-01

    Full Text Available For generations, the process of cost estimation has been manual, time-consuming and error-prone. Emerging Building Information Modelling (BIM can exploit standard measurement methods to automate cost estimation process and improve inaccuracies. Structuring standard measurement methods in an ontologically and machine readable format for a BIM software can greatly facilitate the process of improving inaccuracies in cost estimation. This study explores the development of an ontology based on New Rules of Measurement (NRM for cost estimation during the tendering stages. The methodology adopted is methontology, one of the most widely used ontology engineering methodologies. To ensure the ontology is fit for purpose, cost estimation experts are employed to check the semantics, descriptive logic-based reasoners are used to syntactically check the ontology and a leading 4D BIM modelling software is used on a case study building to test/validate the proposed ontology.

  11. Thermal and nuclear power generation cost estimates using corporate financial statements

    International Nuclear Information System (INIS)

    Matsuo, Yuhji; Nagatomi, Yu; Murakami, Tomoko

    2012-01-01

    There are two generally accepted methods for estimating power generation costs: so-called 'model plant' method and the method using corporate financial statements. The method using corporate financial statements, though under some constraints, can provide useful information for comparing thermal and nuclear power generation costs. This study used this method for estimating thermal and nuclear power generation costs in Japan for the past five years, finding that the nuclear power generation cost remained stable at around 7 yen per kilowatt-hour (kWh) while the thermal power generation cost moved within a wide range of 9 to 12 yen/kWh in line with wild fluctuations in primary energy prices. The cost of nuclear power generation is expected to increase due to the enhancement of safety measures and accident damage compensation in the future, while there are reactor decommissioning, backend and many other costs that the financial statement-using approach cannot accurately estimate. In the future, efforts should be continued to comprehensively and accurately estimate total costs. (author)

  12. Preliminary Cost Estimates for Nuclear Hydrogen Production: HTSE System

    International Nuclear Information System (INIS)

    Yang, K. J.; Lee, K. Y.; Lee, T. H.

    2008-01-01

    KAERI is now focusing on the research and development of the key technologies required for the design and realization of a nuclear hydrogen production system. As a preliminary study of cost estimates for nuclear hydrogen systems, the hydrogen production costs of the nuclear energy sources benchmarking GTMHR and PBMR are estimated in the necessary input data on a Korean specific basis. G4-ECONS was appropriately modified to calculate the cost for hydrogen production of HTSE (High Temperature Steam Electrolysis) process with VHTR (Very High Temperature nuclear Reactor) as a thermal energy source. The estimated costs presented in this paper show that hydrogen production by the VHTR could be competitive with current techniques of hydrogen production from fossil fuels if CO 2 capture and sequestration is required. Nuclear production of hydrogen would allow large-scale production of hydrogen at economic prices while avoiding the release of CO 2 . Nuclear production of hydrogen could thus become the enabling technology for the hydrogen economy. The major factors that would affect the cost of hydrogen were also discussed

  13. Operations and Maintenance Cost for Stratified Buildings: A Critical Review

    Directory of Open Access Journals (Sweden)

    Che-Ghani Nor Zaimah

    2016-01-01

    Full Text Available Building maintenance is essential in preserving buildings’ appearance and performance. It needs to upkeep the building performance to prolong its value and building life cycle. Malaysia is still lacking in managing cost for building operation and maintenance. It has been found that the cost for housing maintenance is high due to poor maintenance practices. In order to get better understanding on how to manage the cost, this study reviews the contributing factors that affecting operation and maintenance cost of stratified buildings in Malaysia. The research first identified the factors through extensive literature review and scrutinize on factors that affecting and can minimize operation and maintenance cost. This literature review offers insight into building maintenance scenario in Malaysia focusing on the issues and challenges. The study also finds that operation and maintenance cost for housing in Malaysia is still in poor state. Interestingly, this paper revealed that operation and maintenance cost is also influenced by three significant factors like expectation of tenants, building characteristics and building defects. Measures to reduce the housing operation and maintenance cost are also highlighted so that this study can be a stepping stone towards proposing efficient and effective facilities management strategies for affordable housing in future.

  14. The QUELCE Method: Using Change Drivers to Estimate Program Costs

    Science.gov (United States)

    2016-08-01

    Analysis 4 2.4 Assign Conditional Probabilities 5 2.5 Apply Uncertainty to Cost Formula Inputs for Scenarios 5 2.6 Perform Monte Carlo Simulation to...Distribution Statement A: Approved for Public Release; Distribution is Unlimited 1 Introduction: The Cost Estimation Challenge Because large-scale programs... challenged [Bliss 2012]. Improvements in cost estimation that would make these assumptions more precise and reduce early lifecycle uncertainty can

  15. Cost Estimates for the Decontamination and Decommissioning of Eight ORNL Buildings

    International Nuclear Information System (INIS)

    Hogan, M.

    2006-01-01

    The U.S. Department of Energy's Oak Ridge National Laboratory (ORNL) contains a number of buildings that are antiquated and no longer used. These buildings historically were used for the production of atomic weapons and often remain contaminated with radioactive materials. Certain costs and risks are associated with the long-term stewardship of the buildings. One way to reduce these liabilities is to eliminate the buildings that are no longer in use and are not expected to be used in the future. Some of these buildings at ORNL are located in an area known as 'Isotope Circle'. From this area, eight buildings that are expected to be decontaminated and decommissioned (D and D) in the next five to ten years were chosen to have cost estimates completed. The specific facilities are Buildings 3030, 3031, 3118, 3032, 3033, 3033 Annex, 3034, and 3093. There are many challenges for estimating the costs to D and D buildings potentially contaminated with radionuclides. Each building is unique, has various types and levels of contamination, and (as in this case) often lacks up-to-date information. Because of these limitations, order-of- magnitude cost estimates for each of the eight ORNL buildings were completed using parametric cost modeling software known as RACER TM (Remedial Action Cost Engineering and Requirements System). This type of cost estimate is useful for screening technical concepts and is used for budgetary planning. For the eight buildings evaluated in this study, the total cost to D and D was estimated to be nearly $6 M. This value includes the direct cost of approximately $3.5 M to complete D and D and $2.5 M in cost markups. Also, assuming the actual project does not begin until the year 2010, this total cost is escalated to almost $6.7 M, which accounts for expected inflation. Although the cost estimates in this study were expected to have a wide range in accuracy, there are various factors that could impact these estimates in a negative or positive fashion

  16. 19 CFR 10.814 - Direct costs of processing operations.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Direct costs of processing operations. 10.814... Free Trade Agreement Rules of Origin § 10.814 Direct costs of processing operations. (a) Items included. For purposes of § 10.810(b) of this subpart, the words “direct costs of processing operations”, with...

  17. 19 CFR 10.774 - Direct costs of processing operations.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Direct costs of processing operations. 10.774... Free Trade Agreement Rules of Origin § 10.774 Direct costs of processing operations. (a) Items included. For purposes of § 10.770(b) of this subpart, the words “direct costs of processing operations”, with...

  18. Estimating two indirect logging costs caused by accelerated erosion.

    Science.gov (United States)

    Glen O. Klock

    1976-01-01

    In forest areas where high soil erosion potential exists, a comparative yarding cost estimate, including the indirect costs determined by methods proposed here, shows that the total cost of using "advanced" logging methods may be less than that of "traditional" systems.

  19. U.S. Nuclear Power Plant Operating Cost and Experience Summaries

    International Nuclear Information System (INIS)

    Reid, RL

    2003-01-01

    The ''U.S. Nuclear Power Plant Operating Cost and Experience Summaries'' (NUREG/CR-6577, Supp. 2) report has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants during 2000-2001. Costs incurred after initial construction are characterized as annual production costs, which represent fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications, which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operations summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from operating reports submitted by the licensees, the Nuclear Regulatory Commission (NRC) database for enforcement actions, and outage reports

  20. A non-stationary cost-benefit based bivariate extreme flood estimation approach

    Science.gov (United States)

    Qi, Wei; Liu, Junguo

    2018-02-01

    Cost-benefit analysis and flood frequency analysis have been integrated into a comprehensive framework to estimate cost effective design values. However, previous cost-benefit based extreme flood estimation is based on stationary assumptions and analyze dependent flood variables separately. A Non-Stationary Cost-Benefit based bivariate design flood estimation (NSCOBE) approach is developed in this study to investigate influence of non-stationarities in both the dependence of flood variables and the marginal distributions on extreme flood estimation. The dependence is modeled utilizing copula functions. Previous design flood selection criteria are not suitable for NSCOBE since they ignore time changing dependence of flood variables. Therefore, a risk calculation approach is proposed based on non-stationarities in both marginal probability distributions and copula functions. A case study with 54-year observed data is utilized to illustrate the application of NSCOBE. Results show NSCOBE can effectively integrate non-stationarities in both copula functions and marginal distributions into cost-benefit based design flood estimation. It is also found that there is a trade-off between maximum probability of exceedance calculated from copula functions and marginal distributions. This study for the first time provides a new approach towards a better understanding of influence of non-stationarities in both copula functions and marginal distributions on extreme flood estimation, and could be beneficial to cost-benefit based non-stationary bivariate design flood estimation across the world.

  1. Estimation of cost-effectiveness of the Finnish electricity distribution utilities

    International Nuclear Information System (INIS)

    Kopsakangas-Savolainen, Maria; Svento, Rauli

    2008-01-01

    This paper examines the cost-effectiveness of Finnish electricity distribution utilities. We estimate several panel data stochastic frontier specifications using both Cobb-Douglas and Translog model specifications. The conventional models are extended in order to model observed heterogeneity explicitly in the cost frontier models. The true fixed effects model has been used as a representative of the models which account for unobserved heterogeneity and extended conventional random effect models have been used in analysing the impact of observed heterogeneity. A comparison between the conventional random effects model and models where heterogeneity component is entered either into the mean or into the variance of the inefficiency term shows that relative efficiency scores diminish when heterogeneity is added to the analysis. The true fixed effects model on the other hand gives clearly smaller inefficiency scores than random effects models. In the paper we also show that the relative inefficiency scores and rankings are not sensitive to the cost function specification. Our analysis points out the importance of the efficient use of the existing distribution network. The economies of scale results suggest that firms could reduce their operating costs by using networks more efficiently. According to our results average size firms which have high load factors are the most efficient ones. All firms have unused capacities so that they can improve cost-effectiveness rather by increasing the average distributed volumes than by mergers

  2. Estimation of cost-effectiveness of the Finnish electricity distribution utilities

    Energy Technology Data Exchange (ETDEWEB)

    Kopsakangas-Savolainen, Maria; Svento, Rauli [Department of Economics, University of Oulu (Finland)

    2008-03-15

    This paper examines the cost-effectiveness of Finnish electricity distribution utilities. We estimate several panel data stochastic frontier specifications using both Cobb-Douglas and Translog model specifications. The conventional models are extended in order to model observed heterogeneity explicitly in the cost frontier models. The true fixed effects model has been used as a representative of the models which account for unobserved heterogeneity and extended conventional random effect models have been used in analysing the impact of observed heterogeneity. A comparison between the conventional random effects model and models where heterogeneity component is entered either into the mean or into the variance of the inefficiency term shows that relative efficiency scores diminish when heterogeneity is added to the analysis. The true fixed effects model on the other hand gives clearly smaller inefficiency scores than random effects models. In the paper we also show that the relative inefficiency scores and rankings are not sensitive to the cost function specification. Our analysis points out the importance of the efficient use of the existing distribution network. The economies of scale results suggest that firms could reduce their operating costs by using networks more efficiently. According to our results average size firms which have high load factors are the most efficient ones. All firms have unused capacities so that they can improve cost-effectiveness rather by increasing the average distributed volumes than by mergers. (author)

  3. Methodology used in IRSN nuclear accident cost estimates in France

    International Nuclear Information System (INIS)

    2015-01-01

    This report describes the methodology used by IRSN to estimate the cost of potential nuclear accidents in France. It concerns possible accidents involving pressurized water reactors leading to radioactive releases in the environment. These accidents have been grouped in two accident families called: severe accidents and major accidents. Two model scenarios have been selected to represent each of these families. The report discusses the general methodology of nuclear accident cost estimation. The crucial point is that all cost should be considered: if not, the cost is underestimated which can lead to negative consequences for the value attributed to safety and for crisis preparation. As a result, the overall cost comprises many components: the most well-known is offsite radiological costs, but there are many others. The proposed estimates have thus required using a diversity of methods which are described in this report. Figures are presented at the end of this report. Among other things, they show that purely radiological costs only represent a non-dominant part of foreseeable economic consequences. (authors)

  4. Wind turbine noise reduction. An indicative cost estimation; Sanering windturbinegeluid. Een indicatieve raming van kosten

    Energy Technology Data Exchange (ETDEWEB)

    Verheijen, E.N.G.; Jabben, J.

    2011-11-15

    Since the 1st of January 2011 new rules apply for wind turbine noise. The rules include a different calculation method and different noise limits, intended for new wind turbines. In order to tackle noise annoyance from existing wind turbines the government is considering to set up a abatement operation, for which a cost estimate is given in this study. At an abatement limit of 47 decibel L{sub den} (Level day-evening-night) approximately 450 dwellings would be eligible for noise remediation. The costs of this operation are estimated at 4.9 million euro. However, in many of these cases the wind turbine is probably owned by the respective residents. It is possible that public funds for noise remediation will not be allocated to the owners of dwellings that directly profit from the turbines. If these cases are excluded, the abatement operation would cover 165 to 275 dwellings with estimated costs for remediation of 1.6 to 2.6 million euro. A tentative cost-benefit analysis suggests that noise remediation will be cost effective in most situations. This means that the benefits of reduced annoyance or sleep disturbance are in balance with the cost of remediation. Only for the small group of wind turbines that are in use for over fifteen years, remediation will not be cost effective. These wind turbines are nearing the end of their lifespan and are therefore ignored in the above estimates. [Dutch] Sinds 1 januari 2011 zijn nieuwe regels rond windturbinegeluid van kracht. Bij de nieuwe regelgeving hoort een andere berekeningsmethode en normstelling, bedoeld voor nieuw te plaatsen windturbines. Voor de aanpak van de geluidhinder door bestaande windturbines overweegt de overheid een saneringsoperatie op te zetten, waarvoor in dit onderzoek een kostenraming wordt gegeven. Bij een saneringsgrenswaarde van 47 decibel zouden ongeveer 450 woningen voor sanering in aanmerking komen. De kosten voor sanering daarvan worden geschat op 4,9 miljoen euro. Bij een groot deel van deze

  5. Rough order of magnitude cost estimate for immobilization of 50 MT of plutonium using existing facilities at Hanford: alternative 11B

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons (nominal) of plutonium as a ceramic in an existing facility at Hanford, the Fuels and Materials Examination Facility (FMEF)

  6. Characteristic features of determining the labor input and estimated cost of the development and manufacture of equipment

    Science.gov (United States)

    Kurmanaliyev, T. I.; Breslavets, A. V.

    1974-01-01

    The difficulties in obtaining exact calculation data for the labor input and estimated cost are noted. The method of calculating the labor cost of the design work using the provisional normative indexes with respect to individual forms of operations is proposed. Values of certain coefficients recommended for use in the practical calculations of the labor input for the development of new scientific equipment for space research are presented.

  7. Estimating Drilling Cost and Duration Using Copulas Dependencies Models

    Directory of Open Access Journals (Sweden)

    M. Al Kindi

    2017-03-01

    Full Text Available Estimation of drilling budget and duration is a high-level challenge for oil and gas industry. This is due to the many uncertain activities in the drilling procedure such as material prices, overhead cost, inflation, oil prices, well type, and depth of drilling. Therefore, it is essential to consider all these uncertain variables and the nature of relationships between them. This eventually leads into the minimization of the level of uncertainty and yet makes a "good" estimation points for budget and duration given the well type. In this paper, the copula probability theory is used in order to model the dependencies between cost/duration and MRI (mechanical risk index. The MRI is a mathematical computation, which relates various drilling factors such as: water depth, measured depth, true vertical depth in addition to mud weight and horizontal displacement. In general, the value of MRI is utilized as an input for the drilling cost and duration estimations. Therefore, modeling the uncertain dependencies between MRI and both cost and duration using copulas is important. The cost and duration estimates for each well were extracted from the copula dependency model where research study simulate over 10,000 scenarios. These new estimates were later compared to the actual data in order to validate the performance of the procedure. Most of the wells show moderate - weak relationship of MRI dependence, which means that the variation in these wells can be related to MRI but to the extent that it is not the primary source.

  8. Supplemental report on cost estimates'

    International Nuclear Information System (INIS)

    1992-01-01

    The Office of Management and Budget (OMB) and the U.S. Army Corps of Engineers have completed an analysis of the Department of Energy's (DOE) Fiscal Year (FY) 1993 budget request for its Environmental Restoration and Waste Management (ERWM) program. The results were presented to an interagency review group (IAG) of senior-Administration officials for their consideration in the budget process. This analysis included evaluations of the underlying legal requirements and cost estimates on which the ERWM budget request was based. The major conclusions are contained in a separate report entitled, ''Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program.'' This Corps supplemental report provides greater detail on the cost analysis

  9. Trends in nuclear power plant capital-investment cost estimates - 1976 to 1982

    International Nuclear Information System (INIS)

    Bowers, H.I.; Fuller, L.C.; Myers, M.L.

    1983-09-01

    This report describes trends in power plant capital investment cost estimates over the time period from 1976 to 1982. A review of economic parameters, inflation and escalation rates and cost of money, and a review of cost-size scaling relationships are included. Reference cost estimates are provided for light-water reactor and coal-fired electric power plants based on safety and environmental regulations in effect in January 1982. The sensitivity of the reference cost estimates to numerous economic parameters is analyzed

  10. Estimating the cost of epilepsy in Europe: a review with economic modeling.

    Science.gov (United States)

    Pugliatti, Maura; Beghi, Ettore; Forsgren, Lars; Ekman, Mattias; Sobocki, Patrik

    2007-12-01

    Based on available epidemiologic, health economic, and international population statistics literature, the cost of epilepsy in Europe was estimated. Europe was defined as the 25 European Union member countries, Iceland, Norway, and Switzerland. Guidelines for epidemiological studies on epilepsy were used for a case definition. A bottom-up prevalence-based cost-of-illness approach, the societal perspective for including the cost items, and the human capital approach as valuation principle for indirect costs were used. The cost estimates were based on selected studies with common methodology and valuation principles. The estimated prevalence of epilepsy in Europe in 2004 was 4.3-7.8 per 1,000. The estimated total cost of the disease in Europe was euro15.5 billion in 2004, indirect cost being the single most dominant cost category (euro8.6 billion). Direct health care costs were euro2.8 billion, outpatient care comprising the largest part (euro1.3 billion). Direct nonmedical cost was euro4.2 billion. That of antiepileptic drugs was euro400 million. The total cost per case was euro2,000-11,500 and the estimated cost per European inhabitant was euro33. Epilepsy is a relevant socioeconomic burden at individual, family, health services, and societal level in Europe. The greater proportion of such burden is outside the formal health care sector, antiepileptic drugs representing a smaller proportion. Lack of economic data from several European countries and other methodological limitations make this report an initial estimate of the cost of epilepsy in Europe. Prospective incidence cost-of-illness studies from well-defined populations and common methodology are encouraged.

  11. Methods for developing useful estimates of the costs associated with birth defects.

    Science.gov (United States)

    Case, Amy P; Canfield, Mark A

    2009-11-01

    Cost estimates for birth defects are useful to policy makers in deciding the best use of resources to prevent these conditions. Much of the effort in this area has focused on spina bifida, in part because cost savings can be estimated from folic acid-preventable cases. However, comprehensive cost-of-illness estimates for this condition may be too outdated, too general, or not applicable to individual states' environments. Using the live birth prevalence for spina bifida in Texas, we applied recent spina bifida cost estimates to approximate total lifetime medical and other costs for an average live birth cohort of spina bifida cases in Texas. In addition, we queried various government programs that provide services for persons with spina bifida to provide program-specific annual costs for this condition. Applying a recently published average lifetime medical cost of $635,000 per case of spina bifida to the average annual birth cohort of 120 Texas cases, an estimated $76 million in direct and indirect medical and other costs will be incurred in Texas over the life span of that cohort. Examples of estimated medical costs for one year are $5 million for infants using actual employer-paid insurance claims data and $6 million combined for children in two public sector programs. Stakeholders and state policy makers may look to state birth defects registries for useful cost data. Although comprehensive state-specific figures are not available, applying prevalence data to existing estimates and obtaining actual claims and program expenditures may help close this information gap.

  12. Pointwise estimates of pseudo-differential operators

    DEFF Research Database (Denmark)

    Johnsen, Jon

    As a new technique it is shown how general pseudo-differential operators can be estimated at arbitrary points in Euclidean space when acting on functions u with compact spectra.The estimate is a factorisation inequality, in which one factor is the Peetre–Fefferman–Stein maximal function of u......, whilst the other is a symbol factor carrying the whole information on the symbol. The symbol factor is estimated in terms of the spectral radius of u, so that the framework is well suited for Littlewood–Paley analysis. It is also shown how it gives easy access to results on polynomial bounds...... and estimates in Lp , including a new result for type 1,1-operators that they are always bounded on Lp -functions with compact spectra....

  13. Pointwise estimates of pseudo-differential operators

    DEFF Research Database (Denmark)

    Johnsen, Jon

    2011-01-01

    As a new technique it is shown how general pseudo-differential operators can be estimated at arbitrary points in Euclidean space when acting on functions u with compact spectra. The estimate is a factorisation inequality, in which one factor is the Peetre–Fefferman–Stein maximal function of u......, whilst the other is a symbol factor carrying the whole information on the symbol. The symbol factor is estimated in terms of the spectral radius of u, so that the framework is well suited for Littlewood–Paley analysis. It is also shown how it gives easy access to results on polynomial bounds...... and estimates in Lp, including a new result for type 1, 1-operators that they are always bounded on Lp-functions with compact spectra....

  14. Case Study to Apply Work Difficulty Factors to Decommissioning Cost Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Taesik; Jung, Hyejin; Oh, Jaeyoung; Kim, Younggook [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    This article is prepared as a guideline regarding how to apply the work difficult factor (WDF) when it comes to the estimates of the decommissioning costs. Although several cases of the decommissioning cost estimates have been made for a few commercial nuclear power plants, the different technical, site-specific economic assumptions used make it difficult to interpret those cost estimates and compare them with that of Kori-1. In addition, it is clear that we are supposed to experience difficulties being created in the process of the Kori-1 and the virtual inaccessibility to the limited areas at the pre-decommissioning stage. Estimating decommissioning costs is one of the most crucial processes since it encompasses all the spectrum of decommissioning activities from the planning to the last evaluation on whether the decommissioning has successfully been proceeded from the safety and economic perspectives. Here I suggested the activity dependent costs is only related to WDFs of the incumbent plant planning or undergone to be decommissioned since as a matter of fact, estimating WDFs is the core process to articulately scrutinize the practical costs to apply to Kori-1 project.

  15. Operating Costs Reducing in MDF Manufacturing Industries

    Directory of Open Access Journals (Sweden)

    José Augusto Coeve Florino

    2014-05-01

    Full Text Available The sustained efforts by electric motors when subjected to cutting, trimming or finishing are directly related to the material being machined and the angle of attack of the tool. Choosing the right tool for this operation depends on an expected result. So the engines behave differently to each operation. The optimization between strength, speed, power, material and type of operation, can be found to reduce operational costs of production, besides determining the exact time to make the set-up of worn tool. The reduction in operating costs is an item of sustainability that outlines the strategic positioning on companies to become competitive in the global marketplace. With the great technological development present today, this issue goes away with the very latest products on the market for professionals who productivity will be dealt with in these modern maintenance equipment such as power quality analyzer, Imager, profile projector and microscope for research. The result of this work is the optimization of the cutting operation and energy consumption thereby demonstrating an optimum point of operation in a case study presented in this work.

  16. Fuzzy/Neural Software Estimates Costs of Rocket-Engine Tests

    Science.gov (United States)

    Douglas, Freddie; Bourgeois, Edit Kaminsky

    2005-01-01

    The Highly Accurate Cost Estimating Model (HACEM) is a software system for estimating the costs of testing rocket engines and components at Stennis Space Center. HACEM is built on a foundation of adaptive-network-based fuzzy inference systems (ANFIS) a hybrid software concept that combines the adaptive capabilities of neural networks with the ease of development and additional benefits of fuzzy-logic-based systems. In ANFIS, fuzzy inference systems are trained by use of neural networks. HACEM includes selectable subsystems that utilize various numbers and types of inputs, various numbers of fuzzy membership functions, and various input-preprocessing techniques. The inputs to HACEM are parameters of specific tests or series of tests. These parameters include test type (component or engine test), number and duration of tests, and thrust level(s) (in the case of engine tests). The ANFIS in HACEM are trained by use of sets of these parameters, along with costs of past tests. Thereafter, the user feeds HACEM a simple input text file that contains the parameters of a planned test or series of tests, the user selects the desired HACEM subsystem, and the subsystem processes the parameters into an estimate of cost(s).

  17. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    Energy Technology Data Exchange (ETDEWEB)

    Ruth, M.

    2011-10-01

    This independent review is the conclusion arrived at from data collection, document reviews, interviews and deliberation from December 2010 through April 2011 and the technical potential of Hydrogen Production Cost Estimate Using Biomass Gasification. The Panel reviewed the current H2A case (Version 2.12, Case 01D) for hydrogen production via biomass gasification and identified four principal components of hydrogen levelized cost: CapEx; feedstock costs; project financing structure; efficiency/hydrogen yield. The panel reexamined the assumptions around these components and arrived at new estimates and approaches that better reflect the current technology and business environments.

  18. On Cost Estimate for Decommissioning of one Isotope Central

    International Nuclear Information System (INIS)

    Marek Vasko et al

    2010-08-01

    The main scope of this study has been to calculate the future cost for decommission and dismantling the Isotope central at the Studsvik site using the OMEGA CODE. Detailed empirical information is used in the study for 'bench-marking' purposes, in such cases when there is a need to supplement and correct field data from the industry. In the present study, data has been retrieved and organized such that the estimated costs for decommissioning of the Isotope Central become transparent and reliable. This approach gives a preliminary qualitative indication about the accuracy of the cost estimate delivered by the industry

  19. On Cost Estimate for Decommissioning of one Isotope Central

    Energy Technology Data Exchange (ETDEWEB)

    Marek Vasko et al

    2010-08-15

    The main scope of this study has been to calculate the future cost for decommission and dismantling the Isotope central at the Studsvik site using the OMEGA CODE. Detailed empirical information is used in the study for 'bench-marking' purposes, in such cases when there is a need to supplement and correct field data from the industry. In the present study, data has been retrieved and organized such that the estimated costs for decommissioning of the Isotope Central become transparent and reliable. This approach gives a preliminary qualitative indication about the accuracy of the cost estimate delivered by the industry

  20. Comparing NASA and ESA Cost Estimating Methods for Human Missions to Mars

    Science.gov (United States)

    Hunt, Charles D.; vanPelt, Michel O.

    2004-01-01

    To compare working methodologies between the cost engineering functions in NASA Marshall Space Flight Center (MSFC) and ESA European Space Research and Technology Centre (ESTEC), as well as to set-up cost engineering capabilities for future manned Mars projects and other studies which involve similar subsystem technologies in MSFC and ESTEC, a demonstration cost estimate exercise was organized. This exercise was a direct way of enhancing not only cooperation between agencies but also both agencies commitment to credible cost analyses. Cost engineers in MSFC and ESTEC independently prepared life-cycle cost estimates for a reference human Mars project and subsequently compared the results and estimate methods in detail. As a non-sensitive, public domain reference case for human Mars projects, the Mars Direct concept was chosen. In this paper the results of the exercise are shown; the differences and similarities in estimate methodologies, philosophies, and databases between MSFC and ESTEC, as well as the estimate results for the Mars Direct concept. The most significant differences are explained and possible estimate improvements identified. In addition, the Mars Direct plan and the extensive cost breakdown structure jointly set-up by MSFC and ESTEC for this concept are presented. It was found that NASA applied estimate models mainly based on historic Apollo and Space Shuttle cost data, taking into account the changes in technology since then. ESA used models mostly based on European satellite and launcher cost data, taking into account the higher equipment and testing standards for human space flight. Most of NASA's and ESA s estimates for the Mars Direct case are comparable, but there are some important, consistent differences in the estimates for: 1) Large Structures and Thermal Control subsystems; 2) System Level Management, Engineering, Product Assurance and Assembly, Integration and Test/Verification activities; 3) Mission Control; 4) Space Agency Program Level

  1. An Adjusted Discount Rate Model for Fuel Cycle Cost Estimation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. K.; Kang, G. B.; Ko, W. I. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    Owing to the diverse nuclear fuel cycle options available, including direct disposal, it is necessary to select the optimum nuclear fuel cycles in consideration of the political and social environments as well as the technical stability and economic efficiency of each country. Economic efficiency is therefore one of the significant evaluation standards. In particular, because nuclear fuel cycle cost may vary in each country, and the estimated cost usually prevails over the real cost, when evaluating the economic efficiency, any existing uncertainty needs to be removed when possible to produce reliable cost information. Many countries still do not have reprocessing facilities, and no globally commercialized HLW (High-level waste) repository is available. A nuclear fuel cycle cost estimation model is therefore inevitably subject to uncertainty. This paper analyzes the uncertainty arising out of a nuclear fuel cycle cost evaluation from the viewpoint of a cost estimation model. Compared to the same discount rate model, the nuclear fuel cycle cost of a different discount rate model is reduced because the generation quantity as denominator in Equation has been discounted. Namely, if the discount rate reduces in the back-end process of the nuclear fuel cycle, the nuclear fuel cycle cost is also reduced. Further, it was found that the cost of the same discount rate model is overestimated compared with the different discount rate model as a whole.

  2. An Adjusted Discount Rate Model for Fuel Cycle Cost Estimation

    International Nuclear Information System (INIS)

    Kim, S. K.; Kang, G. B.; Ko, W. I.

    2013-01-01

    Owing to the diverse nuclear fuel cycle options available, including direct disposal, it is necessary to select the optimum nuclear fuel cycles in consideration of the political and social environments as well as the technical stability and economic efficiency of each country. Economic efficiency is therefore one of the significant evaluation standards. In particular, because nuclear fuel cycle cost may vary in each country, and the estimated cost usually prevails over the real cost, when evaluating the economic efficiency, any existing uncertainty needs to be removed when possible to produce reliable cost information. Many countries still do not have reprocessing facilities, and no globally commercialized HLW (High-level waste) repository is available. A nuclear fuel cycle cost estimation model is therefore inevitably subject to uncertainty. This paper analyzes the uncertainty arising out of a nuclear fuel cycle cost evaluation from the viewpoint of a cost estimation model. Compared to the same discount rate model, the nuclear fuel cycle cost of a different discount rate model is reduced because the generation quantity as denominator in Equation has been discounted. Namely, if the discount rate reduces in the back-end process of the nuclear fuel cycle, the nuclear fuel cycle cost is also reduced. Further, it was found that the cost of the same discount rate model is overestimated compared with the different discount rate model as a whole

  3. Wood fuelled boiler operating costs

    International Nuclear Information System (INIS)

    Sandars, D.L.

    1995-01-01

    This report is a management study into the operating costs of wood-fired boilers. Data obtained from existing wood-fired plant has been analysed and interpreted using the principles of machinery management and the science that underlies the key differences between this fuel and any other. A set of budgeting principles has been developed for the key areas of labour requirement, insurance, maintenance and repair and electricity consumption. Other lesser cost centres such as the provision of shelter and the effects of neglect and accidents have also been considered, and a model constructed. (author)

  4. Methodology for estimating reprocessing costs for nuclear fuels

    International Nuclear Information System (INIS)

    Carter, W.L.; Rainey, R.H.

    1980-02-01

    A technological and economic evaluation of reprocessing requirements for alternate fuel cycles requires a common assessment method and a common basis to which various cycles can be related. A methodology is described for the assessment of alternate fuel cycles utilizing a side-by-side comparison of functional flow diagrams of major areas of the reprocessing plant with corresponding diagrams of the well-developed Purex process as installed in the Barnwell Nuclear Fuel Plant (BNFP). The BNFP treats 1500 metric tons of uranium per year (MTU/yr). Complexity and capacity factors are determined for adjusting the estimated facility and equipment costs of BNFP to determine the corresponding costs for the alternate fuel cycle. Costs of capacities other than the reference 1500 MT of heavy metal per year are estimated by the use of scaling factors. Unit costs of reprocessed fuel are calculated using a discounted cash flow analysis for three economic bases to show the effect of low-risk, typical, and high-risk financing methods

  5. Estimating the cost of production stoppage

    Science.gov (United States)

    Delionback, L. M.

    1979-01-01

    Estimation model considers learning curve quantities, and time of break to forecast losses due to break in production schedule. Major parameters capable of predicting costs are number of units made prior to production sequence, length of production break, and slope of learning curve produced prior to break.

  6. Is There a Limit to Growth? Comparing the Environmental Cost of an Airport’s Operations with Its Economic Benefit

    Directory of Open Access Journals (Sweden)

    Cherie Lu

    2017-11-01

    Full Text Available With the growing global awareness of the requirement for sustainable development, economic development is no longer the sole objective of business activities. The need to find a balance between environmental impacts and economic benefits is especially the case for airport operations in or around cities. This study measured the environmental costs and economic benefits and of an airport for a period of 10 years, using Taipei Songshan Airport for the empirical analysis, to examine whether the environmental costs could outweigh the economic benefits. Of all the environmental negative side effects, aircraft engine emissions and noise nuisance are considered the main sources of environmental impacts. The dose-response method and the hedonic price method, respectively, were used for estimating the social costs of these. Income generation from both direct and secondary employment is measured as economic benefits by applying the Garin-Lowry model, originally developed in 1966, for estimation of the employment multiplier. The results show that, in general, the operation of Taipei Songshan Airport brought more economic benefits than environmental costs. The sensitivity analysis of emissions and noise social cost parameters shows that the environmental costs might have exceeded the economic benefits in 2008 and 2009 in certain high emissions and noise social cost cases.

  7. A level playing field-obtaining consistent cost estimates for advanced reactor designs

    International Nuclear Information System (INIS)

    Hudson, C.R.; Rohm, H.H.; Humphreys, J.R.

    1987-01-01

    A level playing field in sports is necessary to avoid a situation in which a team has an unfair advantage over its competition. Similarly, rules and guidelines for developing cost estimates can be established which, in effect, provide a level playing field whereby cost estimates for advanced power plant concepts can be presented on a consistent and equitable basis. As an example, consider the capital costs shown in Table 1. Both sets of cost are for the exact same power plant; Estimate 1 is expressed in constant dollars while Estimate 2 is presented in nominal or as-spent dollars. As shown, the costs in Table 1 are not directly comparable. Similar problems can be introduced as a result of differing assumptions in any number of parameters including the scope of the cost estimate, inflation/escalation and interest rates, contingency costs, and site location. Of course, the motivation for having consistent cost estimates is to permit comparison among various concepts. As the U.S. Department of Energy sponsors research and development work on several advanced reactor concepts in which expected cost is a key evaluation parameter, the emphasis in this particular endeavor has been in promoting the comparability of advanced reactor cost estimates among themselves and to existing power plant types. To continue with the analogy, the idea is to lay out the playing field and the rules of the contest such that each team participates in the match on an equal basis with the final score being solely determined by the inherent strengths and abilities of the teams. A description of the playing field and some of the more important rules will now be provided

  8. An Evaluation of the Automated Cost Estimating Integrated Tools (ACEIT) System

    Science.gov (United States)

    1989-09-01

    C~4p DTIC S ELECTE fl JAN12 19 .1R ~OF S%. B -U AN EVALUATION OF THE AUTOMATED COST ESTIMATING INTEGRATED TOOLS ( ACEIT ) SYSTEM THESIS Caroline L...Ohio go 91 022 AFIT/GCA/LSQ/89S-5 AN EVALUATION OF THE AUTOMATED COST ESTIMATING INTEGRATED TOOLS ( ACEIT ) SYSTEM THESIS Caroline L. Hanson Major, USAF...Department of Defense. AFIT/GCA/LSQ/89S-5 AN EVALUATION OF THE AUTOMATED COST ESTIMATING INTEGRATED TOOLS ( ACEIT ) SYSTEM THESIS Presented to the

  9. Risk-adjusted econometric model to estimate postoperative costs: an additional instrument for monitoring performance after major lung resection.

    Science.gov (United States)

    Brunelli, Alessandro; Salati, Michele; Refai, Majed; Xiumé, Francesco; Rocco, Gaetano; Sabbatini, Armando

    2007-09-01

    The objectives of this study were to develop a risk-adjusted model to estimate individual postoperative costs after major lung resection and to use it for internal economic audit. Variable and fixed hospital costs were collected for 679 consecutive patients who underwent major lung resection from January 2000 through October 2006 at our unit. Several preoperative variables were used to develop a risk-adjusted econometric model from all patients operated on during the period 2000 through 2003 by a stepwise multiple regression analysis (validated by bootstrap). The model was then used to estimate the postoperative costs in the patients operated on during the 3 subsequent periods (years 2004, 2005, and 2006). Observed and predicted costs were then compared within each period by the Wilcoxon signed rank test. Multiple regression and bootstrap analysis yielded the following model predicting postoperative cost: 11,078 + 1340.3X (age > 70 years) + 1927.8X cardiac comorbidity - 95X ppoFEV1%. No differences between predicted and observed costs were noted in the first 2 periods analyzed (year 2004, $6188.40 vs $6241.40, P = .3; year 2005, $6308.60 vs $6483.60, P = .4), whereas in the most recent period (2006) observed costs were significantly lower than the predicted ones ($3457.30 vs $6162.70, P model may be used as a methodologic template for economic audit in our specialty and complement more traditional outcome measures in the assessment of performance.

  10. Waste management facilities cost information: System cost model product description. Revision 2

    International Nuclear Information System (INIS)

    Lundeen, A.S.; Hsu, K.M.; Shropshire, D.E.

    1996-02-01

    In May of 1994, Lockheed Idaho Technologies Company (LITCO) in Idaho Falls, Idaho and subcontractors developed the System Cost Model (SCM) application. The SCM estimates life-cycle costs of the entire US Department of Energy (DOE) complex for designing; constructing; operating; and decommissioning treatment, storage, and disposal (TSD) facilities for mixed low-level, low-level, transuranic, and mixed transuranic waste. The SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing facilities at DOE installations. In addition, SCM can model new facilities based on capacity needs over the program life cycle. The SCM also provides transportation costs for DOE wastes. Transportation costs are provided for truck and rail and include transport of contact-handled, remote-handled, and alpha (transuranic) wastes. The user can provide input data (default data is included in the SCM) including the volume and nature of waste to be managed, the time period over which the waste is to be managed, and the configuration of the waste management complex (i.e., where each installation's generated waste will be treated, stored, and disposed). Then the SCM uses parametric cost equations to estimate the costs of pre-operations (designing), construction costs, operation management, and decommissioning these waste management facilities

  11. Cost estimate for electrostatically plugged cusp reactor

    International Nuclear Information System (INIS)

    Dolan, T.J.

    1977-01-01

    A preliminary design of an electrostatically plugged cusp reactor was presented in (UCRL-52142(1976)). The capital costs of the various components of this reactor are estimated and totaled for two different blanket configurations: one having an energy multiplication factor M = 1.2, and the other having M = 1.68. The unoptimized direct capital costs for these cases are found to be about 1400 and 950 $/kWe, respectively

  12. Estimation of the cost of large-scale school deworming programmes with benzimidazoles

    Science.gov (United States)

    Montresor, A.; Gabrielli, A.F.; Engels, D.

    2017-01-01

    Summary This study estimates the cost of distributing benzimidazole tablets in the context of school deworming programmes: we analysed studies reporting the cost of school deworming from seven countries in four WHO regions. The estimated cost for drug procurement to cover one million children (including customs clearance and international transport) is approximately US$20 000. The estimated financial costs (including the cost of training of personnel, drug transport, social mobilization and monitoring) is, on average, equivalent to US$33 000 per million school-age children with minimal variation in different countries and continents. The estimated economic costs of distribution (including the time spent by teachers, and health personnel at central, provincial and district level) to cover one million children approximately corresponds to US$19 000. This study shows the minimal cost of school deworming activities, but also shows the significant contribution (corresponding to a quarter of the entire cost of the programme) provided by health and education systems in endemic countries even in the case of drug donations and donor support of distribution costs. PMID:19926104

  13. EOS Operations Systems: EDOS Implemented Changes to Reduce Operations Costs

    Science.gov (United States)

    Cordier, Guy R.; Gomez-Rosa, Carlos; McLemore, Bruce D.

    2007-01-01

    The authors describe in this paper the progress achieved to-date with the reengineering of the Earth Observing System (EOS) Data and Operations System (EDOS), the experience gained in the process and the ensuing reduction of ground systems operations costs. The reengineering effort included a major methodology change, applying to an existing schedule driven system, a data-driven system approach.

  14. Cost estimation for decommissioning of research reactors

    International Nuclear Information System (INIS)

    Grossi, Pablo Andrade; Tello, Cledola Cassia Oliveira de; Segabinaze, Roberto de Oliveira; Daniska, Vladimir

    2013-01-01

    In the case of research reactors, the limited data that is available tends to provide only overall decommissioning costs, without any breakdown of the main cost elements. In order to address this subject, it is important to collect and analyse all available data of decommissioning costs for the research reactors. The IAEA has started the DACCORD Project focused on data analysis and costing of research reactors decommissioning. Data collection is organized in accordance with the International Structure for Decommissioning Costing (ISDC), developed jointly by the IAEA, the OECD Nuclear Energy Agency and the European Commission. The specific aims of the project include the development of representative and comparative data and datasets for preliminary costing for decommissioning. This paper will focus on presenting a technique to consider several representative input data in accordance with the ISDC structure and using the CERREX (Cost Estimation for Research Reactors in Excel) software developed by IAEA. (author)

  15. The Software Cost Estimation Method Based on Fuzzy Ontology

    Directory of Open Access Journals (Sweden)

    Plecka Przemysław

    2014-12-01

    Full Text Available In the course of sales process of Enterprise Resource Planning (ERP Systems, it turns out that the standard system must be extended or changed (modified according to specific customer’s requirements. Therefore, suppliers face the problem of determining the cost of additional works. Most methods of cost estimation bring satisfactory results only at the stage of pre-implementation analysis. However, suppliers need to know the estimated cost as early as at the stage of trade talks. During contract negotiations, they expect not only the information about the costs of works, but also about the risk of exceeding these costs or about the margin of safety. One method that gives more accurate results at the stage of trade talks is the method based on the ontology of implementation costs. This paper proposes modification of the method involving the use of fuzzy attributes, classes, instances and relations in the ontology. The result provides not only the information about the value of work, but also about the minimum and maximum expected cost, and the most likely range of costs. This solution allows suppliers to effectively negotiate the contract and increase the chances of successful completion of the project.

  16. State-Level Estimates of Obesity-Attributable Costs of Absenteeism

    Science.gov (United States)

    Andreyeva, Tatiana; Luedicke, Joerg; Wang, Y. Claire

    2014-01-01

    Objective To provide state-level estimates of obesity-attributable costs of absenteeism among working adults in the U.S. Methods Nationally-representative data from the National Health and Nutrition Examination Survey (NHANES) for 1998–2008 and from the Behavioral Risk Factor Surveillance System (BRFSS) for 2012 are examined. The outcome is obesity-attributable workdays missed in the previous year due to health, and their costs to states. Results Obesity, but not overweight, is associated with a significant increase in workdays absent, from 1.1 to 1.7 extra days missed annually compared to normal weight employees. Obesity-attributable absenteeism among American workers costs the nation an estimated $8.65 billion per year. Conclusion Obesity imposes a considerable financial burden on states, accounting for 6.5%–12.6% of total absenteeism costs in the workplace. State legislature and employers should seek effective ways to reduce these costs. PMID:25376405

  17. A comparison of two methods for estimating the technical costs of external beam radiation therapy

    International Nuclear Information System (INIS)

    Hayman, James A.; Lash, Kathy A.; Tao, May L.; Halman, Marc A.

    2000-01-01

    Purpose: To accurately assess the cost-effectiveness of treatment with external beam radiation, it is necessary to have accurate estimates of its cost. One of the most common methods for estimating technical costs has been to convert Medicare charges into costs using Medicare Cost-to-Charge Ratios (CCR). More recently, health care organizations have begun to invest in sophisticated cost-accounting systems (CAS) that are capable of providing procedure-specific cost estimates. The purpose of this study was to examine whether these competing approaches result in similar cost estimates for four typical courses of external beam radiation therapy (EBRT). Methods and Materials: Technical costs were estimated for the following treatment courses: 1) a palliative 'simple' course of 10 fractions using a single field without blocks; 2) a palliative 'complex' course of 10 fractions using two opposed fields with custom blocks; 3) a curative course of 30 fractions for breast cancer using tangent fields followed by an electron beam boost; and 4) a curative course of 35 fractions for prostate cancer using CT-planning and a 4-field technique. Costs were estimated using the CCR approach by multiplying the number of units of each procedure billed by its Medicare charge and CCR and then summing these costs. Procedure-specific cost estimates were obtained from a cost-accounting system, and overall costs were then estimated for the CAS approach by multiplying the number of units billed by the appropriate unit cost estimate and then summing these costs. All costs were estimated using data from 1997. The analysis was also repeated using data from another academic institution to estimate their costs using the CCR and CAS methods, as well as the appropriate relative value units (RVUs) and conversion factor from the 1997 Medicare Fee Schedule to estimate Medicare reimbursement for the four treatment courses. Results: The estimated technical costs for the CCR vs. CAS approaches for the four

  18. Analysis operating and maintenance cost of Danish wind turbines in 1993

    International Nuclear Information System (INIS)

    Godtfredsen, F.

    1994-10-01

    A study of operation and maintenance (O and M) cost of Danish wind turbines has been carried out. The study is based on a questionnaire survey by the wind turbine owners association. The study shows a significant decline in the O and M cost from 55 kW machines installed in 1980-87 to modern machines. In 1993, the average total O and M cost for 55 kW and 150 kW turbines was approximately 0.22 DKK/kWh and 0.07 DKK/kWh, respectively. For 150 kW turbines, insurance and administration costs amounted to 0.04 DKK/kWh while repair and maintenance costs came to 0.03 DKK/kWh. In 1993, repair and maintenance cost were significantly higher for older vintages of 55 kW and 150 kW turbines, but it is not possible based on this study to conclude whether increasing O and M costs generally comes with increasing age. The statistical basis of this study is not large enough to conclude whether there are positive scale effects for ST's from 105 kW. Similarly, because of relatively few large WT are older than 10 years, it is not possible based on this study to predict the size of major future repair costs/reinvestments. To estimate the O and M costs more exactly, a larger empirical basis is needed. (au) (8 tabs., 17 ills., 11 refs.)

  19. Smooth time-dependent receiver operating characteristic curve estimators.

    Science.gov (United States)

    Martínez-Camblor, Pablo; Pardo-Fernández, Juan Carlos

    2018-03-01

    The receiver operating characteristic curve is a popular graphical method often used to study the diagnostic capacity of continuous (bio)markers. When the considered outcome is a time-dependent variable, two main extensions have been proposed: the cumulative/dynamic receiver operating characteristic curve and the incident/dynamic receiver operating characteristic curve. In both cases, the main problem for developing appropriate estimators is the estimation of the joint distribution of the variables time-to-event and marker. As usual, different approximations lead to different estimators. In this article, the authors explore the use of a bivariate kernel density estimator which accounts for censored observations in the sample and produces smooth estimators of the time-dependent receiver operating characteristic curves. The performance of the resulting cumulative/dynamic and incident/dynamic receiver operating characteristic curves is studied by means of Monte Carlo simulations. Additionally, the influence of the choice of the required smoothing parameters is explored. Finally, two real-applications are considered. An R package is also provided as a complement to this article.

  20. A Mathematical model to predict the US Airlines operation costs and airports charges per route per passenger

    NARCIS (Netherlands)

    Carmona Benitez, R.B.; Lodewijiks, G.

    2010-01-01

    A mathematical model to estimate the average airlines operational costs and airports charges per route is important for airlines companies trying to open new routes and for data generation for other purpose such as transport modeling, simulation modeling, investment analyses for airlines and

  1. Modeling Optimal Scheduling for Pumping System to Minimize Operation Cost and Enhance Operation Reliability

    Directory of Open Access Journals (Sweden)

    Yin Luo

    2012-01-01

    Full Text Available Traditional pump scheduling models neglect the operation reliability which directly relates with the unscheduled maintenance cost and the wear cost during the operation. Just for this, based on the assumption that the vibration directly relates with the operation reliability and the degree of wear, it could express the operation reliability as the normalization of the vibration level. The characteristic of the vibration with the operation point was studied, it could be concluded that idealized flow versus vibration plot should be a distinct bathtub shape. There is a narrow sweet spot (80 to 100 percent BEP to obtain low vibration levels in this shape, and the vibration also follows similar law with the square of the rotation speed without resonance phenomena. Then, the operation reliability could be modeled as the function of the capacity and rotation speed of the pump and add this function to the traditional model to form the new. And contrast with the tradition method, the result shown that the new model could fix the result produced by the traditional, make the pump operate in low vibration, then the operation reliability could increase and the maintenance cost could decrease.

  2. Top-down and bottom-up approaches for cost estimating new reactor designs

    International Nuclear Information System (INIS)

    Berbey, P.; Gautier, G.M.; Duflo, D.; Rouyer, J.L.

    2007-01-01

    For several years, Generation-4 designs will be 'pre-conceptual' for the less mature concepts and 'preliminary' for the more mature concepts. In this situation, appropriate data for some of the plant systems may be lacking to develop a bottom-up cost estimate. Therefore, a more global approach, the Top-Down Approach (TDA), is needed to help the designers and decision makers in comparing design options. It utilizes more or less simple models for cost estimating the different parts of a design. TDA cost estimating effort applies to a whole functional element whose cost is approached by similar estimations coming from existing data, ratios and models, for a given range of variation of parameters. Modeling is used when direct analogy is not possible. There are two types of models, global and specific ones. Global models are applied to cost modules related to Code Of Account. Exponential formulae such as Ci = Ai + (Bi x Pi n ) are used when there are cost data for comparable modules in nuclear or other industries. Specific cost models are developed for major specific components of the plant: - process equipment such as reactor vessel, steam generators or large heat exchangers. - buildings, with formulae estimating the construction cost from base cost of m3 of building volume. - systems, when unit costs, cost ratios and models are used, depending on the level of detail of the design. Bottom Up Approach (BUA), which is based on unit prices coming from similar equipment or from manufacturer consulting, is very valuable and gives better cost estimations than TDA when it can be applied, that is at a rather late stage of the design. Both approaches are complementary when some parts of the design are detailed enough to be estimated by BUA, and when BUA results are used to check TDA results and to improve TDA models. This methodology is applied to the HTR (High Temperature Reactor) concept and to an advanced PWR design

  3. Final report on cost estimate of forward superconducting air core toroid

    International Nuclear Information System (INIS)

    Fields, T.

    1992-12-01

    An independent cost-estimate for key components of the forward superconducting air core toroid (ACT) was obtained in May 1992 from an experienced manufacturer of large cryogenic vessels. This new cost estimate is summarized in this report. It implies that a suitably designed ACT may have a cost which is approximately equal to that of the presently designed SDC forward iron core toroid

  4. Fusion reactor design studies: standard accounts for cost estimates

    International Nuclear Information System (INIS)

    Schulte, S.C.; Willke, T.L.; Young, J.R.

    1978-05-01

    The fusion reactor design studies--standard accounts for cost estimates provides a common format from which to assess the economic character of magnetically confined fusion reactor design concepts. The format will aid designers in the preparation of design concept costs estimates and also provide policymakers with a tool to assist in appraising which design concept may be economically promising. The format sets forth a categorization and accounting procedure to be used when estimating fusion reactor busbar energy cost that can be easily and consistently applied. Reasons for developing the procedure, explanations of the procedure, justifications for assumptions made in the procedure, and the applicability of the procedure are described in this document. Adherence to the format when evaluating prospective fusion reactor design concepts will result in the identification of the more promising design concepts thus enabling the fusion power alternatives with better economic potential to be quickly and efficiently developed

  5. Design and cost estimate for the SRL integrated hot off gas facility using selective adsorption

    International Nuclear Information System (INIS)

    Pence, D.T.; Kirstein, B.E.

    1981-07-01

    Based on the results of an engineering-scale demonstration program, a design and cost estimate were performed for a 25-m 3 /h (15-ft 3 /min) capacity pilot plant demonstration system using selective adsorption technology for installation at the Integrated Hot Off Gas Facility at the Savannah River Plant. The design includes provisions for the destruction of NO/sub x/ and the concentration and removal of radioisotopes of ruthenium, iodine-129, tritiated water vapor, carbon-14 contaminated carbon dioxide, and krypton-85. The nobel gases are separated by the use of selective adsorption on mordenite-type zeolites. The theory of noble gas adsorption on zeolites is essentially the same as that for the adsorption of noble gases on activated charcoals. Considerable detail is provided regarding the application of the theory to adsorbent bed designs and operation. The design is based on a comprehensive material balance and appropriate heat transfer calculations. Details are provided on techniques and procedures used for heating, cooling, and desorbing the adsorbent columns. Analyses are also given regarding component and arrangement selection and includes discussions on alternative arrangements. The estimated equipment costs for the described treatment system is about $1,400,000. The cost estimate includes a detailed equipment list of all the major component items in the design. Related technical issues and estimated system performance are also discussed

  6. Design and cost estimate for the SRL integrated hot off gas facility using selective adsorption

    Energy Technology Data Exchange (ETDEWEB)

    Pence, D T; Kirstein, B E

    1981-07-01

    Based on the results of an engineering-scale demonstration program, a design and cost estimate were performed for a 25-m/sup 3//h (15-ft/sup 3//min) capacity pilot plant demonstration system using selective adsorption technology for installation at the Integrated Hot Off Gas Facility at the Savannah River Plant. The design includes provisions for the destruction of NO/sub x/ and the concentration and removal of radioisotopes of ruthenium, iodine-129, tritiated water vapor, carbon-14 contaminated carbon dioxide, and krypton-85. The nobel gases are separated by the use of selective adsorption on mordenite-type zeolites. The theory of noble gas adsorption on zeolites is essentially the same as that for the adsorption of noble gases on activated charcoals. Considerable detail is provided regarding the application of the theory to adsorbent bed designs and operation. The design is based on a comprehensive material balance and appropriate heat transfer calculations. Details are provided on techniques and procedures used for heating, cooling, and desorbing the adsorbent columns. Analyses are also given regarding component and arrangement selection and includes discussions on alternative arrangements. The estimated equipment costs for the described treatment system is about $1,400,000. The cost estimate includes a detailed equipment list of all the major component items in the design. Related technical issues and estimated system performance are also discussed.

  7. Estimated Impact of the Regional Operational Programme 2007-2013 in Romania

    Directory of Open Access Journals (Sweden)

    Daniela Antonescu

    2013-08-01

    Full Text Available The evaluation process is a basic element of modern public sector management practice. If this process is well conducted, it can contribute to improved public interventions, increased transparency, accountability and cost-effectiveness. In the European Union, old Member States have a relatively long record of conducting evaluations and acting on their results, especially regarding Structural Funds. For Romania and other new Member States, this process is being introduced increasingly, in particular, after integration. The study analyses the estimated impact of Regional Operational Programme 2007-2013 in Romania.

  8. Estimation of the cost of large-scale school deworming programmes with benzimidazoles.

    Science.gov (United States)

    Montresor, A; Gabrielli, A F; Diarra, A; Engels, D

    2010-02-01

    This study estimates the cost of distributing benzimidazole tablets in the context of school deworming programmes: we analysed studies reporting the cost of school deworming from seven countries in four WHO regions. The estimated cost for drug procurement to cover one million children (including customs clearance and international transport) is approximately US$20000. The estimated financial costs (including the cost of training of personnel, drug transport, social mobilization and monitoring) is, on average, equivalent to US$33000 per million school-age children with minimal variation in different countries and continents. The estimated economic costs of distribution (including the time spent by teachers, and health personnel at central, provincial and district level) to cover one million children approximately corresponds to US$19000. This study shows the minimal cost of school deworming activities, but also shows the significant contribution (corresponding to a quarter of the entire cost of the programme) provided by health and education systems in endemic countries even in the case of drug donations and donor support of distribution costs. Copyright 2009 Royal Society of Tropical Medicine and Hygiene. Published by Elsevier Ltd. All rights reserved.

  9. A practical approach for calculating reliable cost estimates from observational data: application to cost analyses in maternal and child health.

    Science.gov (United States)

    Salemi, Jason L; Comins, Meg M; Chandler, Kristen; Mogos, Mulubrhan F; Salihu, Hamisu M

    2013-08-01

    Comparative effectiveness research (CER) and cost-effectiveness analysis are valuable tools for informing health policy and clinical care decisions. Despite the increased availability of rich observational databases with economic measures, few researchers have the skills needed to conduct valid and reliable cost analyses for CER. The objectives of this paper are to (i) describe a practical approach for calculating cost estimates from hospital charges in discharge data using publicly available hospital cost reports, and (ii) assess the impact of using different methods for cost estimation in maternal and child health (MCH) studies by conducting economic analyses on gestational diabetes (GDM) and pre-pregnancy overweight/obesity. In Florida, we have constructed a clinically enhanced, longitudinal, encounter-level MCH database covering over 2.3 million infants (and their mothers) born alive from 1998 to 2009. Using this as a template, we describe a detailed methodology to use publicly available data to calculate hospital-wide and department-specific cost-to-charge ratios (CCRs), link them to the master database, and convert reported hospital charges to refined cost estimates. We then conduct an economic analysis as a case study on women by GDM and pre-pregnancy body mass index (BMI) status to compare the impact of using different methods on cost estimation. Over 60 % of inpatient charges for birth hospitalizations came from the nursery/labor/delivery units, which have very different cost-to-charge markups (CCR = 0.70) than the commonly substituted hospital average (CCR = 0.29). Using estimated mean, per-person maternal hospitalization costs for women with GDM as an example, unadjusted charges ($US14,696) grossly overestimated actual cost, compared with hospital-wide ($US3,498) and department-level ($US4,986) CCR adjustments. However, the refined cost estimation method, although more accurate, did not alter our conclusions that infant/maternal hospitalization costs

  10. Estimating the cost of cervical cancer screening in five developing countries

    Directory of Open Access Journals (Sweden)

    Goldie Sue J

    2006-08-01

    Full Text Available Abstract Background Cost-effectiveness analyses (CEAs can provide useful information to policymakers concerned with the broad allocation of resources as well as to local decision makers choosing between different options for reducing the burden from a single disease. For the latter, it is important to use country-specific data when possible and to represent cost differences between countries that might make one strategy more or less attractive than another strategy locally. As part of a CEA of cervical cancer screening in five developing countries, we supplemented limited primary cost data by developing other estimation techniques for direct medical and non-medical costs associated with alternative screening approaches using one of three initial screening tests: simple visual screening, HPV DNA testing, and cervical cytology. Here, we report estimation methods and results for three cost areas in which data were lacking. Methods To supplement direct medical costs, including staff, supplies, and equipment depreciation using country-specific data, we used alternative techniques to quantify cervical cytology and HPV DNA laboratory sample processing costs. We used a detailed quantity and price approach whose face validity was compared to an adaptation of a US laboratory estimation methodology. This methodology was also used to project annual sample processing capacities for each laboratory type. The cost of sample transport from the clinic to the laboratory was estimated using spatial models. A plausible range of the cost of patient time spent seeking and receiving screening was estimated using only formal sector employment and wages as well as using both formal and informal sector participation and country-specific minimum wages. Data sources included primary data from country-specific studies, international databases, international prices, and expert opinion. Costs were standardized to year 2000 international dollars using inflation adjustment and

  11. Spreadsheet tool for estimating noise reduction costs

    International Nuclear Information System (INIS)

    Frank, L.; Senden, V.; Leszczynski, Y.

    2009-01-01

    The Northeast Capital Industrial Association (NCIA) represents industry in Alberta's industrial heartland. The organization is in the process of developing a regional noise management plan (RNMP) for their member companies. The RNMP includes the development of a noise reduction cost spreadsheet tool to conduct reviews of practical noise control treatments available for individual plant equipment, inclusive of ranges of noise attenuation achievable, which produces a budgetary prediction of the installed cost of practical noise control treatments. This paper discussed the noise reduction cost spreadsheet tool, with particular reference to noise control best practices approaches and spreadsheet tool development such as prerequisite, assembling data required, approach, and unit pricing database. Use and optimization of the noise reduction cost spreadsheet tool was also discussed. It was concluded that the noise reduction cost spreadsheet tool is an easy interactive tool to estimate implementation costs related to different strategies and options of noise control mitigating measures and was very helpful in gaining insight for noise control planning purposes. 2 tabs.

  12. Operational costs induced by fluctuating wind power production in Germany and Scandinavia

    DEFF Research Database (Denmark)

    Meibom, Peter; Weber, C.; Barth, R.

    2009-01-01

    Adding wind power generation in a power system changes the operational patterns of the existing units due to the variability and partial predictability of wind power production. For large amounts of wind power production, the expectation is that the specific operational costs (fuel costs, start......-up costs, variable operation and maintenance costs, costs of consuming CO2 emission permits) of the other power plants will increase due to more operation time in part-load and more start-ups. The change in operational costs induced by the wind power production can only be calculated by comparing...... the operational costs in two power system configurations: with wind power production and with alternative wind production having properties such as conventional production, that is, being predictable and less variable. The choice of the characteristics of the alternative production is not straightforward...

  13. A non-stationary cost-benefit analysis approach for extreme flood estimation to explore the nexus of 'Risk, Cost and Non-stationarity'

    Science.gov (United States)

    Qi, Wei

    2017-11-01

    Cost-benefit analysis is commonly used for engineering planning and design problems in practice. However, previous cost-benefit based design flood estimation is based on stationary assumption. This study develops a non-stationary cost-benefit based design flood estimation approach. This approach integrates a non-stationary probability distribution function into cost-benefit analysis, and influence of non-stationarity on expected total cost (including flood damage and construction costs) and design flood estimation can be quantified. To facilitate design flood selections, a 'Risk-Cost' analysis approach is developed, which reveals the nexus of extreme flood risk, expected total cost and design life periods. Two basins, with 54-year and 104-year flood data respectively, are utilized to illustrate the application. It is found that the developed approach can effectively reveal changes of expected total cost and extreme floods in different design life periods. In addition, trade-offs are found between extreme flood risk and expected total cost, which reflect increases in cost to mitigate risk. Comparing with stationary approaches which generate only one expected total cost curve and therefore only one design flood estimation, the proposed new approach generate design flood estimation intervals and the 'Risk-Cost' approach selects a design flood value from the intervals based on the trade-offs between extreme flood risk and expected total cost. This study provides a new approach towards a better understanding of the influence of non-stationarity on expected total cost and design floods, and could be beneficial to cost-benefit based non-stationary design flood estimation across the world.

  14. Preliminary design and estimate of capital and operating costs for a production scale application of laser decontamination technology

    International Nuclear Information System (INIS)

    Pang, Ho-ming; Edelson, M.C.

    1994-01-01

    The application of laser ablation technology to the decontamination of radioactive metals, particularly the surfaces of equipment, is discussed. Included is information related to the design, capital and operating costs, and effectiveness of laser ablation technology, based on commercial excimer and Nd:YAG lasers, for the decontamination of production scale equipment

  15. Space Infrared Telescope Facility (SIRTF) - Operations concept. [decreasing development and operations cost

    Science.gov (United States)

    Miller, Richard B.

    1992-01-01

    The development and operations costs of the Space IR Telescope Facility (SIRTF) are discussed in the light of minimizing total outlays and optimizing efficiency. The development phase cannot extend into the post-launch segment which is planned to only support system verification and calibration followed by operations with a 70-percent efficiency goal. The importance of reducing the ground-support staff is demonstrated, and the value of the highly sensitive observations to the general astronomical community is described. The Failure Protection Algorithm for the SIRTF is designed for the 5-yr lifetime and the continuous venting of cryogen, and a science driven ground/operations system is described. Attention is given to balancing cost and performance, prototyping during the development phase, incremental development, the utilization of standards, and the integration of ground system/operations with flight system integration and test.

  16. Rough order of magnitude cost estimate for immobilization of 50MT of plutonium using new facilities at the Savannah River site: alternative 12A

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons of plutonium using ceramic in a new facility at Savannah River Site (SRS)

  17. Risk-Cost Estimation of On-Site Wastewater Treatment System Failures Using Extreme Value Analysis.

    Science.gov (United States)

    Kohler, Laura E; Silverstein, JoAnn; Rajagopalan, Balaji

    2017-05-01

      Owner resistance to increasing regulation of on-site wastewater treatment systems (OWTS), including obligatory inspections and upgrades, moratoriums and cease-and-desist orders in communities around the U.S. demonstrate the challenges associated with managing risks of inadequate performance of owner-operated wastewater treatment systems. As a result, determining appropriate and enforceable performance measures in an industry with little history of these requirements is challenging. To better support such measures, we develop a statistical method to predict lifetime failure risks, expressed as costs, in order to identify operational factors associated with costly repairs and replacement. A binomial logistic regression is used to fit data from public records of reported OWTS failures, in Boulder County, Colorado, which has 14 300 OWTS to determine the probability that an OWTS will be in a low- or high-risk category for lifetime repair and replacement costs. High-performing or low risk OWTS with repairs and replacements below the threshold of $9000 over a 40-year life are associated with more frequent inspections and upgrades following home additions. OWTS with a high risk of exceeding the repair cost threshold of $18 000 are further analyzed in a variation of extreme value analysis (EVA), Points Over Threshold (POT) where the distribution of risk-cost exceedance values are represented by a generalized Pareto distribution. The resulting threshold cost exceedance estimates for OWTS in the high-risk category over a 40-year expected life ranged from $18 000 to $44 000.

  18. Methodology applied by IRSN for nuclear accident cost estimations in France

    International Nuclear Information System (INIS)

    2013-01-01

    This report describes the methodology used by IRSN to estimate the cost of potential nuclear accidents in France. It concerns possible accidents involving pressurized water reactors leading to radioactive releases in the environment. These accidents have been grouped in two accident families called: severe accidents and major accidents. Two model scenarios have been selected to represent each of these families. The report discusses the general methodology of nuclear accident cost estimation. The crucial point is that all cost should be considered: if not, the cost is underestimated which can lead to negative consequences for the value attributed to safety and for crisis preparation. As a result, the overall cost comprises many components: the most well-known is offsite radiological costs, but there are many others. The proposed estimates have thus required using a diversity of methods which are described in this report. Figures are presented at the end of this report. Among other things, they show that purely radiological costs only represent a non-dominant part of foreseeable economic consequences

  19. Estimating the costs of the vaccine supply chain and service delivery for selected districts in Kenya and Tanzania.

    Science.gov (United States)

    Mvundura, Mercy; Lorenson, Kristina; Chweya, Amos; Kigadye, Rosemary; Bartholomew, Kathryn; Makame, Mohammed; Lennon, T Patrick; Mwangi, Steven; Kirika, Lydia; Kamau, Peter; Otieno, Abner; Murunga, Peninah; Omurwa, Tom; Dafrossa, Lyimo; Kristensen, Debra

    2015-05-28

    Having data on the costs of the immunization system can provide decision-makers with information to benchmark the costs when evaluating the impact of new technologies or programmatic innovations. This paper estimated the supply chain and immunization service delivery costs and cost per dose in selected districts in Kenya and Tanzania. We also present operational data describing the supply chain and service delivery points (SDPs). To estimate the supply chain costs, we collected resource-use data for the cold chain, distribution system, and health worker time and per diems paid. We also estimated the service delivery costs, which included the time cost of health workers to provide immunization services, and per diems and transport costs for outreach sessions. Data on the annual quantities of vaccines distributed to each facility, and the occurrence and duration of stockouts were collected from stock registers. These data were collected from the national store, 2 regional and 4 district stores, and 12 SDPs in each country for 2012. Cost per dose for the supply chain and immunization service delivery were estimated. The average annual costs per dose at the SDPs were $0.34 (standard deviation (s.d.) $0.18) for Kenya when including only the vaccine supply chain costs, and $1.33 (s.d. $0.82) when including immunization service delivery costs. In Tanzania, these costs were $0.67 (s.d. $0.35) and $2.82 (s.d. $1.64), respectively. Both countries experienced vaccine stockouts in 2012, bacillus Calmette-Guérin vaccine being more likely to be stocked out in Kenya, and oral poliovirus vaccine in Tanzania. When stockouts happened, they usually lasted for at least one month. Tanzania made investments in 2011 in preparation for planned vaccine introductions, and their supply chain cost per dose is expected to decline with the new vaccine introductions. Immunization service delivery costs are a significant portion of the total costs at the SDPs. Copyright © 2015 Elsevier Ltd. All

  20. OPERATIONAL COSTS OF CANAL COMPANIES AND IRRIGATION DISTRICTS IN THE INTERMOUNTAIN REGION

    OpenAIRE

    Wilkins-Wells, John; Lagae, Hubert J.; Anderson, Raymond L.; Anwer, Muhammad Sarfraz

    1999-01-01

    This study reports on the trends of operational costs of farmer owned and operated irrigation enterprises (irrigation districts and canal companies) in five intermountain states. Administrative costs have risen faster then operation and maintenance costs. While salaries of employees have not risen significantly over time, legal costs have greatly escalated.

  1. Estimated incremental costs for NRC licensees to implement the US/IAEA safeguards agreement

    International Nuclear Information System (INIS)

    Clark, R.G.; Brouns, R.J.; Chockie, A.D.; Davenport, L.C.; Merrill, J.A.

    1979-01-01

    A study was recently completed for the US Nuclear Regulatory Commision (NRC) by the Pacific Northwest Laboratory (PNL) to identify the incremental cost of implementing the US/IAEA safeguards treaty agreement to eligible NRC licensees. Sources for the study were cost estimates from several licensees who will be affected by the agreement and cost analyses by PNL staff. The initial cost to all eligible licensees to implement the agreement is estimated by PNL to range from $1.9 to $7.2 million. The annual cost to these same licensees for the required accounting and reporting activities is estimated at $0.5 to $1.5 million. Annual inspection costs to the industry for the limited IAEA inspection being assumed is estimated at $80,000 to $160,000

  2. Applying cost accounting to operating room staffing in otolaryngology: time-driven activity-based costing and outpatient adenotonsillectomy.

    Science.gov (United States)

    Balakrishnan, Karthik; Goico, Brian; Arjmand, Ellis M

    2015-04-01

    (1) To describe the application of a detailed cost-accounting method (time-driven activity-cased costing) to operating room personnel costs, avoiding the proxy use of hospital and provider charges. (2) To model potential cost efficiencies using different staffing models with the case study of outpatient adenotonsillectomy. Prospective cost analysis case study. Tertiary pediatric hospital. All otolaryngology providers and otolaryngology operating room staff at our institution. Time-driven activity-based costing demonstrated precise per-case and per-minute calculation of personnel costs. We identified several areas of unused personnel capacity in a basic staffing model. Per-case personnel costs decreased by 23.2% by allowing a surgeon to run 2 operating rooms, despite doubling all other staff. Further cost reductions up to a total of 26.4% were predicted with additional staffing rearrangements. Time-driven activity-based costing allows detailed understanding of not only personnel costs but also how personnel time is used. This in turn allows testing of alternative staffing models to decrease unused personnel capacity and increase efficiency. © American Academy of Otolaryngology—Head and Neck Surgery Foundation 2015.

  3. Economic implications of nuclear operating and maintenance costs

    International Nuclear Information System (INIS)

    Braun, C.

    1994-01-01

    Nuclear operating and maintenance (O and M) costs for U.S. plants have been increasing during the decade of the 1980's. Costs have stabilized over the last five years but have not yet significantly declined. Annual capacity factors have considerably improved during the last eight years and unit O and M costs expressed in Mills Kwh have thus declined. Two other important trends evident over the last five years have been the decline in fossil fuel prices and the transition to deregulated electric utilities market, accelerated with the passage of the 1992 Energy Policy Act. Within the next five years it may be possible for large scale industrial customers to directly contract with electricity generators, by they utilities or independent power producers (IPP's) for supplying their power requirements. The ability of such customers to directly contract with potential supplies based on low cost performance bypassing their local utility, may have significant implications for the structure of the utility industry in the near term and for plant operations. A greater pressure will likely be exerted on all plants, including nuclear to reduce operating costs so as to remain competitive with other power suppliers in their markets. Nuclear O and M costs are likely to be heavily scrutinized for possible savings and reductions. The electric utilities mergers waves and the nuclear industry's initiative on O and M cost control both aim at improving plant economics so as to better compete in the more deregulated environment. In this climate the issues of why nuclear O and M costs have increased, what can be done to reduce costs and what are the implications for advanced reactors design and economics are discussed. 14 figs

  4. Estimated annual cost of arterial hypertension treatment in Brazil.

    Science.gov (United States)

    Dib, Murilo W; Riera, Rachel; Ferraz, Marcos B

    2010-02-01

    To estimate the direct annual cost of systemic arterial hypertension (SAH) treatment in Brazil's public and private health care systems, assess its economic impact on the total health care budget, and determine its proportion of the 2005 gross domestic product (GDP). A decision tree model was used to determine direct costs based on estimated use of various resources in SAH diagnosis and care, including treatment (medication and non-medication), complementary exams, doctor visits, nutritional assessments, and emergency room visits. Estimated direct annual cost of SAH treatment was approximately US$ 398.9 million for the public health care system and US$ 272.7 million for the private system, representing 0.08% of the 2005 GDP (ranging from 0.05% to 0.16%). With total health care expenses comprising about 7.6% of Brazil's GDP, this cost represented 1.11% of overall health care costs (0.62% to 2.06%)-1.43% of total expenses for the Unified Healthcare System (Sistema Unico de Saúde, SUS) (0.79% to 2.75%) and 0.83% of expenses for the private health care system (0.47% to 1.48%). Conclusion. To guarantee public or private health care based on the principles of universality and equality, with limited available resources, efforts must be focused on educating the population on prevention and treatment compliance in diseases such as SAH that require significant health resources.

  5. The cost of universal health care in India: a model based estimate.

    Science.gov (United States)

    Prinja, Shankar; Bahuguna, Pankaj; Pinto, Andrew D; Sharma, Atul; Bharaj, Gursimer; Kumar, Vishal; Tripathy, Jaya Prasad; Kaur, Manmeet; Kumar, Rajesh

    2012-01-01

    As high out-of-pocket healthcare expenses pose heavy financial burden on the families, Government of India is considering a variety of financing and delivery options to universalize health care services. Hence, an estimate of the cost of delivering universal health care services is needed. We developed a model to estimate recurrent and annual costs for providing health services through a mix of public and private providers in Chandigarh located in northern India. Necessary health services required to deliver good quality care were defined by the Indian Public Health Standards. National Sample Survey data was utilized to estimate disease burden. In addition, morbidity and treatment data was collected from two secondary and two tertiary care hospitals. The unit cost of treatment was estimated from the published literature. For diseases where data on treatment cost was not available, we collected data on standard treatment protocols and cost of care from local health providers. We estimate that the cost of universal health care delivery through the existing mix of public and private health institutions would be INR 1713 (USD 38, 95%CI USD 18-73) per person per annum in India. This cost would be 24% higher, if branded drugs are used. Extrapolation of these costs to entire country indicates that Indian government needs to spend 3.8% (2.1%-6.8%) of the GDP for universalizing health care services. The cost of universal health care delivered through a combination of public and private providers is estimated to be INR 1713 per capita per year in India. Important issues such as delivery strategy for ensuring quality, reducing inequities in access, and managing the growth of health care demand need be explored.

  6. Wind turbine reliability :understanding and minimizing wind turbine operation and maintenance costs.

    Energy Technology Data Exchange (ETDEWEB)

    Walford, Christopher A. (Global Energy Concepts. Kirkland, WA)

    2006-03-01

    Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce cost of energy.

  7. U.S. Refinery compliance costs - the elements of and estimate

    International Nuclear Information System (INIS)

    Musgrove, J.G.; Swain, E.J.

    1993-01-01

    A recent National Petroleum Council study identified the environmental costs facing the refining industry from 1995 through 2010. Four broad areas were identified: air pollution control, wastewater treatment, solid and hazardous waste treatment, and occupational health and safety. This paper will present the technical issues and engineering information required to produce an estimate of cost impact. For each of the four areas of impact, the kinds of information required of the refinery manager in order to build an estimate will be tabulated and discussed. For air pollution control, issues will include size and type of unit, product mix of output, and the impact of facility location relative to non-attainment issues. For wastewater, issues will include stormwater segregation, benzene NESHAP, and other treatment system requirements. For hazardous waste treatment, issues will include groundwater protection and leak detection and contaminated soil segregation. For occupational health and safety, issues will include process changes required and worker training required. For all issues, the major dollar factors will be identified as a function of the technical data available. The refinery costs in each areas were estimated for seven groups of refinery sizes. The presentation will conclude with tabulation of cost estimates for each area of investigation and each refinery group. The total costs for each refinery group over the fifteen-year period will also be presented

  8. Cost estimation of thermal and nuclear power using annual securities report

    International Nuclear Information System (INIS)

    Matsuo, Yuji; Nagatomi, Yu; Murakami, Tomoko

    2011-01-01

    Cost estimation of generation cost derived from various power sources was widely conducted using model plant or annual securities report of electric utilities. Although annual securities report method was subjected to some limitation in methodology itself, useful information was obtained for cost comparison of thermal and nuclear power. Studies on generation cost evaluation of thermal and nuclear power based on this method during past five years showed that nuclear power cost was almost stable 7 Yen/kWh and thermal power cost was varying 9 - 12 Yen/kWh dependent on violent fluctuations of primary energy cost. Nuclear power was expected cost increase due to enhanced safety requirements or damage compensation of accidents as well as decommissioning and back-end cost, which were difficult to evaluate accurately with annual securities report. Further comprehensive and accurate cost estimation should be encouraged including these items. (T. Tanaka)

  9. Estimated Incident Cost Savings in Shipping Due to Inspections

    NARCIS (Netherlands)

    S. Knapp (Sabine); G.E. Bijwaard (Govert); C. Heij (Christiaan)

    2010-01-01

    textabstractThe effectiveness of safety inspections has been analysed from various angles, but until now, relatively little attention has been given to translate risk reduction into incident cost savings. This paper quantifies estimated cost savings based on port state control inspections and

  10. ANN Based Approach for Estimation of Construction Costs of Sports Fields

    Directory of Open Access Journals (Sweden)

    Michał Juszczyk

    2018-01-01

    Full Text Available Cost estimates are essential for the success of construction projects. Neural networks, as the tools of artificial intelligence, offer a significant potential in this field. Applying neural networks, however, requires respective studies due to the specifics of different kinds of facilities. This paper presents the proposal of an approach to the estimation of construction costs of sports fields which is based on neural networks. The general applicability of artificial neural networks in the formulated problem with cost estimation is investigated. An applicability of multilayer perceptron networks is confirmed by the results of the initial training of a set of various artificial neural networks. Moreover, one network was tailored for mapping a relationship between the total cost of construction works and the selected cost predictors which are characteristic of sports fields. Its prediction quality and accuracy were assessed positively. The research results legitimatize the proposed approach.

  11. Operational costs induced by fluctuating wind power production in Germany and Scandinavia

    Energy Technology Data Exchange (ETDEWEB)

    Meibom, P. [Risoe National Lab., DTU, System Analysis Dept., Roskilde (Denmark); Weber, C. [Univ. Duisburg-Essen, Chai og Energy Management (Germany); Barth, R.; Brand, H. [Univ. of Stuttgart, Inst. of Energy Economics and the Rational Use of Energy (Germany)

    2007-05-15

    Adding wind power generation in a power system changes the operational patterns of the existing units due to the variability and unpredictability of wind power production. For large amounts of wind power production the expectation is that the operational costs of the other power plants will increase due to more operation time in part-load and more start-ups. The change in operational costs induced by the wind power production can only be calculated by comparing the operational costs in two power system configurations: with wind power production and with alternative production having properties like conventional production, i.e. being predictable and less variable. The choice of the characteristics of the alternative production is not straight forward and will therefore influence the operational costs induced by wind power production. This paper presents a method for calculating the change in operational costs due to wind power production using a stochastic optimization model covering the power systems in Germany and the Nordic countries. Two cases of alternative production are used to calculate the change in operational costs namely perfectly predictable wind power production enabling calculation of the costs connected to unpredictability, and constant wind power production enabling calculation of the operational costs connected to variability of wind power production. A 2010 case with three different wind power production penetration levels is analysed in the paper. (au)

  12. Critical operations capabilities in a high cost environment: a multiple case study

    Science.gov (United States)

    Sansone, C.; Hilletofth, P.; Eriksson, D.

    2018-04-01

    Operations capabilities have been a popular research area for many years and several frameworks have been proposed in the literature. The current frameworks do not take specific contexts into consideration, for instance a high cost environment. This research gap is of particular interest since a manufacturing relocation process has been ongoing the last decades, leading to a huge amount of manufacturing being moved from high to low cost environments. The purpose of this study is to identify critical operations capabilities in a high cost environment. The two research questions were: What are the critical operations capabilities dimensions in a high cost environment? What are the critical operations capabilities in a high cost environment? A multiple case study was conducted and three Swedish manufacturing firms were selected. The study was based on the investigation of an existing framework of operations capabilities. The main dimensions of operations capabilities included in the framework were: cost, quality, delivery, flexibility, service, innovation and environment. Each of the dimensions included two or more operations capabilities. The findings confirmed the validity of the framework and its usefulness in a high cost environment and a new operations capability was revealed (employee flexibility).

  13. Maintenance and operations cost model for DSN subsystems

    Science.gov (United States)

    Burt, R. W.; Lesh, J. R.

    1977-01-01

    A procedure is described which partitions the recurring costs of the Deep Space Network (DSN) over the individual DSN subsystems. The procedure results in a table showing the maintenance, operations, sustaining engineering and supportive costs for each subsystems.

  14. Hospital financing: calculating inpatient capital costs in Germany with a comparative view on operating costs and the English costing scheme.

    Science.gov (United States)

    Vogl, Matthias

    2014-04-01

    The paper analyzes the German inpatient capital costing scheme by assessing its cost module calculation. The costing scheme represents the first separated national calculation of performance-oriented capital cost lump sums per DRG. The three steps in the costing scheme are reviewed and assessed: (1) accrual of capital costs; (2) cost-center and cost category accounting; (3) data processing for capital cost modules. The assessment of each step is based on its level of transparency and efficiency. A comparative view on operating costing and the English costing scheme is given. Advantages of the scheme are low participation hurdles, low calculation effort for G-DRG calculation participants, highly differentiated cost-center/cost category separation, and advanced patient-based resource allocation. The exclusion of relevant capital costs, nontransparent resource allocation, and unclear capital cost modules, limit the managerial relevance and transparency of the capital costing scheme. The scheme generates the technical premises for a change from dual financing by insurances (operating costs) and state (capital costs) to a single financing source. The new capital costing scheme will intensify the discussion on how to solve the current investment backlog in Germany and can assist regulators in other countries with the introduction of accurate capital costing. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  15. Integrating cost management and work management concepts for operations

    International Nuclear Information System (INIS)

    Vanditmars, C.

    1995-01-01

    Development of B C Gas Utility Limited's integrated work and cost management system was described, with emphasis on cost management without reliance on the financial systems, and standard costing and operational side benefits. The objectives of the system were identified as dynamic monitoring and control, and local empowerment. The concept underlying the two systems was explained in detail. In the case of the work management system the ability to manage all work in operations areas was stressed, along with its universal availability. Other benefits expected included improved resource utilization, improved productivity, better control of cost, improved revenue generation, superior customer service, a simplified financial system, and improved employee motivation through empowerment

  16. Rough order of magnitude cost estimate for immobilization of 50 MT of plutonium using existing facilities at the Savannah River site: alternative 12B

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons of plutonium using ceramic in an existing facility (221-F) at an Savannah River Site (SRS)

  17. Effect of facility on the operative costs of distal radius fractures.

    Science.gov (United States)

    Mather, Richard C; Wysocki, Robert W; Mack Aldridge, J; Pietrobon, Ricardo; Nunley, James A

    2011-07-01

    The purpose of this study was to investigate whether ambulatory surgery centers can deliver lower-cost care and to identify sources of those cost savings. We performed a cost identification analysis of outpatient volar plating for closed distal radius fractures at a single academic medical center. Multiple costs and time measures were taken from an internal database of 130 consecutive patients and were compared by venue of treatment, either an inpatient facility or an ambulatory, stand-alone surgery facility. The relationships between total cost and operative time and multiple variables, including fracture severity, patient age, gender, comorbidities, use of bone graft, concurrent carpal tunnel release, and surgeon experience, were examined, using multivariate analysis and regression modeling to identify other cost drivers or explanatory variables. The mean operative cost was considerably greater at the inpatient facility ($7,640) than at the outpatient facility ($5,220). Cost drivers of this difference were anesthesia services, post-anesthesia care unit, and operating room costs. Total surgical time, nursing time, set-up, and operative times were 33%, 109%, 105%, and 35% longer, respectively, at the inpatient facility. There was no significant difference between facilities for the additional variables, and none of those variables independently affected cost or operative time. The only predictor of cost and time was facility type. This study supports the use of ambulatory stand-alone surgical facilities to achieve efficient resource utilization in the operative treatment of distal radius fractures. We also identified several specific costs and time measurements that differed between facilities, which can serve as potential targets for tertiary facilities to improve utilization. Economic and Decisional Analysis III. Copyright © 2011 American Society for Surgery of the Hand. Published by Elsevier Inc. All rights reserved.

  18. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  19. Costs of Clostridium difficile infection in pediatric operations: A propensity score-matching analysis.

    Science.gov (United States)

    Kulaylat, Afif N; Rocourt, Dorothy V; Podany, Abigail B; Engbrecht, Brett W; Twilley, Marianne; Santos, Mary C; Cilley, Robert E; Hollenbeak, Christopher S; Dillon, Peter W

    2017-05-01

    The purpose of this analysis was to assess the burden of Clostridium difficile infection in the hospitalized pediatric surgical population and to characterize its influence on the costs of care. There were 313,664 patients age 1-18 years who underwent a general thoracic or abdominal procedure in the Kids' Inpatient Database during 2003, 2006, 2009, and 2012. Logistic regression was used to model factors associated with the development of C difficile infection. A propensity score-matching analysis was performed to evaluate the influence of C difficile infection on mortality, duration of stay, and costs in similar patient cohorts. Population weights were used to estimate the national excess burden of C difficile infection on these outcomes. The overall prevalence of C difficile infection in the sampled cohort was 0.30%, with an increasing trend of C difficile infection over time in non-children's hospitals (P difficile infection was associated with younger age, nonelective procedures, increasing comorbidities, and urban teaching hospital status (P difficile infection after operation. After propensity score matching, the mean excess duration of stay and costs attributable to C difficile infection were 5.8 days and $12,801 (P difficile infection is a relatively uncommon but costly complication after pediatric operative procedures. Given the increasing trend of C difficile infection among hospitalized surgical patients, there is substantial opportunity for reduction of inpatient burden and associated costs in this potentially preventable nosocomial infection. Copyright © 2016 Elsevier Inc. All rights reserved.

  20. Estimates and implications of the costs of compliance with biosafety regulations in developing countries.

    Science.gov (United States)

    Falck-Zepeda, Jose; Yorobe, Jose; Husin, Bahagiawati Amir; Manalo, Abraham; Lokollo, Erna; Ramon, Godfrey; Zambrano, Patricia; Sutrisno

    2012-01-01

    Estimating the cost of compliance with biosafety regulations is important as it helps developers focus their investments in producer development. We provide estimates for the cost of compliance for a set of technologies in Indonesia, the Philippines and other countries. These costs vary from US $100,000 to 1.7 million. These are estimates of regulatory costs and do not include product development or deployment costs. Cost estimates need to be compared with potential gains when the technology is introduced in these countries and the gains in knowledge accumulate during the biosafety assessment process. Although the cost of compliance is important, time delays and uncertainty are even more important and may have an adverse impact on innovations reaching farmers.

  1. The cost of universal health care in India: a model based estimate.

    Directory of Open Access Journals (Sweden)

    Shankar Prinja

    Full Text Available INTRODUCTION: As high out-of-pocket healthcare expenses pose heavy financial burden on the families, Government of India is considering a variety of financing and delivery options to universalize health care services. Hence, an estimate of the cost of delivering universal health care services is needed. METHODS: We developed a model to estimate recurrent and annual costs for providing health services through a mix of public and private providers in Chandigarh located in northern India. Necessary health services required to deliver good quality care were defined by the Indian Public Health Standards. National Sample Survey data was utilized to estimate disease burden. In addition, morbidity and treatment data was collected from two secondary and two tertiary care hospitals. The unit cost of treatment was estimated from the published literature. For diseases where data on treatment cost was not available, we collected data on standard treatment protocols and cost of care from local health providers. RESULTS: We estimate that the cost of universal health care delivery through the existing mix of public and private health institutions would be INR 1713 (USD 38, 95%CI USD 18-73 per person per annum in India. This cost would be 24% higher, if branded drugs are used. Extrapolation of these costs to entire country indicates that Indian government needs to spend 3.8% (2.1%-6.8% of the GDP for universalizing health care services. CONCLUSION: The cost of universal health care delivered through a combination of public and private providers is estimated to be INR 1713 per capita per year in India. Important issues such as delivery strategy for ensuring quality, reducing inequities in access, and managing the growth of health care demand need be explored.

  2. The Hospitalization Costs of Diabetes and Hypertension Complications in Zimbabwe: Estimations and Correlations

    Directory of Open Access Journals (Sweden)

    Mutsa P. Mutowo

    2016-01-01

    Full Text Available Objective. Treating complications associated with diabetes and hypertension imposes significant costs on health care systems. This study estimated the hospitalization costs for inpatients in a public hospital in Zimbabwe. Methods. The study was retrospective and utilized secondary data from medical records. Total hospitalization costs were estimated using generalized linear models. Results. The median cost and interquartile range (IQR for patients with diabetes, $994 (385–1553 mean $1319 (95% CI: 981–1657, was higher than patients with hypertension, $759 (494–1147 mean $914 (95% CI: 825–1003. Female patients aged below 65 years with diabetes had the highest estimated mean costs ($1467 (95% CI: 1177–1828. Wound care had the highest estimated mean cost of all procedures, $2884 (95% CI: 2004–4149 for patients with diabetes and $2239 (95% CI: 1589–3156 for patients with hypertension. Age below 65 years, medical procedures (amputation, wound care, dialysis, and physiotherapy, the presence of two or more comorbidities, and being prescribed two or more drugs were associated with significantly higher hospitalization costs. Conclusion. Our estimated costs could be used to evaluate and improve current inpatient treatment and management of patients with diabetes and hypertension and determine the most cost-effective interventions to prevent complications and comorbidities.

  3. Estimating the costs of intensity-modulated and 3-dimensional conformal radiotherapy in Ontario.

    Science.gov (United States)

    Yong, J H E; McGowan, T; Redmond-Misner, R; Beca, J; Warde, P; Gutierrez, E; Hoch, J S

    2016-06-01

    Radiotherapy is a common treatment for many cancers, but up-to-date estimates of the costs of radiotherapy are lacking. In the present study, we estimated the unit costs of intensity-modulated radiotherapy (imrt) and 3-dimensional conformal radiotherapy (3D-crt) in Ontario. An activity-based costing model was developed to estimate the costs of imrt and 3D-crt in prostate cancer. It included the costs of equipment, staff, and supporting infrastructure. The framework was subsequently adapted to estimate the costs of radiotherapy in breast cancer and head-and-neck cancer. We also tested various scenarios by varying the program maturity and the use of volumetric modulated arc therapy (vmat) alongside imrt. From the perspective of the health care system, treating prostate cancer with imrt and 3D-crt respectively cost $12,834 and $12,453 per patient. The cost of radiotherapy ranged from $5,270 to $14,155 and was sensitive to analytic perspective, radiation technique, and disease site. Cases of head-and-neck cancer were the most costly, being driven by treatment complexity and fractions per treatment. Although imrt was more costly than 3D-crt, its cost will likely decline over time as programs mature and vmat is incorporated. Our costing model can be modified to estimate the costs of 3D-crt and imrt for various disease sites and settings. The results demonstrate the important role of capital costs in studies of radiotherapy cost from a health system perspective, which our model can accommodate. In addition, our study established the need for future analyses of imrt cost to consider how vmat affects time consumption.

  4. Survey of State-Level Cost and Benefit Estimates of Renewable Portfolio Standards

    Energy Technology Data Exchange (ETDEWEB)

    Heeter, J.; Barbose, G.; Bird, L.; Weaver, S.; Flores-Espino, F.; Kuskova-Burns, K.; Wiser, R.

    2014-05-01

    Most renewable portfolio standards (RPS) have five or more years of implementation experience, enabling an assessment of their costs and benefits. Understanding RPS costs and benefits is essential for policymakers evaluating existing RPS policies, assessing the need for modifications, and considering new policies. This study provides an overview of methods used to estimate RPS compliance costs and benefits, based on available data and estimates issued by utilities and regulators. Over the 2010-2012 period, average incremental RPS compliance costs in the United States were equivalent to 0.8% of retail electricity rates, although substantial variation exists around this average, both from year-to-year and across states. The methods used by utilities and regulators to estimate incremental compliance costs vary considerably from state to state and a number of states are currently engaged in processes to refine and standardize their approaches to RPS cost calculation. The report finds that state assessments of RPS benefits have most commonly attempted to quantitatively assess avoided emissions and human health benefits, economic development impacts, and wholesale electricity price savings. Compared to the summary of RPS costs, the summary of RPS benefits is more limited, as relatively few states have undertaken detailed benefits estimates, and then only for a few types of potential policy impacts. In some cases, the same impacts may be captured in the assessment of incremental costs. For these reasons, and because methodologies and level of rigor vary widely, direct comparisons between the estimates of benefits and costs are challenging.

  5. Life Cycle Costs in Education: Operations & Maintenance Considered.

    Science.gov (United States)

    Moussatche, Helena; Languell-Urquhart, Jennifer; Woodson, Carol

    2000-01-01

    Discusses life cycle cost analysis when deciding on flooring finishes and examines operations and maintenance cost effectiveness relative to hard, resilient, and soft flooring. A chart of evaluated flooring materials' characteristics, appropriate maintenance procedures, and recommended frequency is included. (GR)

  6. Estimation of cellular manufacturing cost components using simulation and activity-based costing

    OpenAIRE

    Paul Savory; Robert Williams

    2010-01-01

    It can be difficult estimating all of the cost components that are attributed to a machined part.  This problem is more pronounced when a factory uses group technology manufacturing cells as opposed to a functional or process layout of a job shop.  This paper describes how activity-based costing (ABC) concepts can be integrated into a discrete-event simulation model of a U-shaped manufacturing cell producing a part family with four members.  The simulation model generates detai...

  7. Estimation of cellular manufacturing cost components using simulation and activity-based costing

    OpenAIRE

    Savory, Paul

    2010-01-01

    It can be difficult estimating all of the cost components that are attributed to a machined part. This problem is more pronounced when a factory uses group technology manufacturing cells as opposed to a functional or process layout of a job shop. This paper describes how activity-based costing (ABC) concepts can be integrated into a discrete-event simulation model of a U-shaped manufacturing cell producing a part family with four members. The simulation model generates detailed Bills of Ac...

  8. Cost estimation of the future harvest as agricultural loan collateral

    Directory of Open Access Journals (Sweden)

    Vnukova, N. N.

    2013-07-01

    Full Text Available The aim of this work is to attempt developing recommendations which may improve the overall banking technique of future cropping cost estimating. Objectives that have been set to achieve this aim are: to analyze alternative techniques of future cropping cost estimating; to perform calculation according to the selected techniques for 10 agricultural companies from different regions of Ukraine; to compare the techniques by means of hierarchy analysis method.

  9. Computer software to estimate timber harvesting system production, cost, and revenue

    Science.gov (United States)

    Dr. John E. Baumgras; Dr. Chris B. LeDoux

    1992-01-01

    Large variations in timber harvesting cost and revenue can result from the differences between harvesting systems, the variable attributes of harvesting sites and timber stands, or changing product markets. Consequently, system and site specific estimates of production rates and costs are required to improve estimates of harvesting revenue. This paper describes...

  10. Uranium milling costs

    International Nuclear Information System (INIS)

    Coleman, R.B.

    1980-01-01

    Basic process flowsheets are reviewed for conventional milling of US ores. Capital costs are presented for various mill capacities for one of the basic processes. Operating costs are shown for various mill capacities for all of the basic process flowsheets. The number of mills using, or planning to use, a particular process is reviewed. A summary of the estimated average milling costs for all operating US mills is shown

  11. A probabilistic model estimating oil spill clean-up costs – A case study for the Gulf of Finland

    International Nuclear Information System (INIS)

    Montewka, Jakub; Weckström, Mia; Kujala, Pentti

    2013-01-01

    Highlights: • A model evaluating oil spill cleanup-costs for the Gulf of Finland is presented. • Bayesian Belief Networks are used to develop the model in a probabilistic fashion. • The results are compared with existing models and good agreement is found. • The model can be applicable for cost-benefit analysis in risk framework. -- Abstract: Existing models estimating oil spill costs at sea are based on data from the past, and they usually lack a systematic approach. This make them passive, and limits their ability to forecast the effect of the changes in the oil combating fleet or location of a spill on the oil spill costs. In this paper we make an attempt towards the development of a probabilistic and systematic model estimating the costs of clean-up operations for the Gulf of Finland. For this purpose we utilize expert knowledge along with the available data and information from literature. Then, the obtained information is combined into a framework with the use of a Bayesian Belief Networks. Due to lack of data, we validate the model by comparing its results with existing models, with which we found good agreement. We anticipate that the presented model can contribute to the cost-effective oil-combating fleet optimization for the Gulf of Finland. It can also facilitate the accident consequences estimation in the framework of formal safety assessment (FSA)

  12. Organizing for low cost space operations - Status and plans

    Science.gov (United States)

    Lee, C.

    1976-01-01

    Design features of the Space Transportation System (vehicle reuse, low cost expendable components, simple payload interfaces, standard support systems) must be matched by economical operational methods to achieve low operating and payload costs. Users will be responsible for their own payloads and will be charged according to the services they require. Efficient use of manpower, simple documentation, simplified test, checkout, and flight planning are firm goals, together with flexibility for quick response to varying user needs. Status of the Shuttle hardware, plans for establishing low cost procedures, and the policy for user charges are discussed.

  13. Cost and radiation exposure optimization of demineralizer operation

    International Nuclear Information System (INIS)

    Bernal, F.E.; Burn, R.R.; Cook, G.M.; Simonetti, L.; Simpson, P.A.

    1985-01-01

    A pool water demineralizer is utilized at a research reactor to minimize impurities that become radioactive; to minimize impurities that react chemically with reactor components; to maintain optical clarity of the pool water; and to minimize aluminum fuel cladding corrosion by maintaining a slightly acidic pH. Balanced against these advantages are the dollar costs of equipment, resins, recharging chemicals, and maintenance; the man-rem costs of radiation exposure during maintenance, demineralizer recharges, and resin replacement; and hazardous chemical exposure. At the Ford Nuclear Reactor (FNR), maintenance of the demineralizer system is the second largest source of radiation exposure to operators. Theoretical and practical aspects of demineralizer operation are discussed. The most obvious way to reduce radiation exposure due to demineralizer system operation is to perform recharges after the reactor has been shut down for the maximum possible time. Setting a higher depletion limit and operating with the optimum system lineup reduce the frequency between recharges, saving both exposure and cost. Recharge frequency and resin lifetime seem to be relatively independent of the quality of the chemicals used and the personnel performing recharges, provided consistent procedures are followed

  14. Estimation of Damage Costs Associated with Flood Events

    Science.gov (United States)

    Andrews, T. A.; Wauthier, C.; Zipp, K.

    2017-12-01

    This study investigates the possibility of creating a mathematical function that enables the estimation of flood-damage costs. We begin by examining the costs associated with past flood events in the United States. The data on these tropical storms and hurricanes are provided by the National Oceanic and Atmospheric Administration. With the location, extent of flooding, and damage reparation costs identified, we analyze variables such as: number of inches rained, land elevation, type of landscape, region development in regards to building density and infrastructure, and population concentration. We seek to identify the leading drivers of high flood-damage costs and understand which variables play a large role in the costliness of these weather events. Upon completion of our mathematical analysis, we turn out attention to the 2017 natural disaster of Texas. We divide the region, as we did above, by land elevation, type of landscape, region development in regards to building density and infrastructure, and population concentration. Then, we overlay the number of inches rained in those regions onto the divided landscape and apply our function. We hope to use these findings to estimate the potential flood-damage costs of Hurricane Harvey. This information is then transformed into a hazard map that could provide citizens and businesses of flood-stricken zones additional resources for their insurance selection process.

  15. Optimising costs in WLCG operations

    CERN Document Server

    Pradillo, Mar; Flix, Josep; Forti, Alessandra; Sciabà, Andrea

    2015-01-01

    The Worldwide LHC Computing Grid project (WLCG) provides the computing and storage resources required by the LHC collaborations to store, process and analyse the 50 Petabytes of data annually generated by the LHC. The WLCG operations are coordinated by a distributed team of managers and experts and performed by people at all participating sites and from all the experiments. Several improvements in the WLCG infrastructure have been implemented during the first long LHC shutdown to prepare for the increasing needs of the experiments during Run2 and beyond. However, constraints in funding will affect not only the computing resources but also the available effort for operations. This paper presents the results of a detailed investigation on the allocation of the effort in the different areas of WLCG operations, identifies the most important sources of inefficiency and proposes viable strategies for optimising the operational cost, taking into account the current trends in the evolution of the computing infrastruc...

  16. Cost estimation for solid waste management in industrialising regions – Precedents, problems and prospects

    International Nuclear Information System (INIS)

    Parthan, Shantha R.; Milke, Mark W.; Wilson, David C.; Cocks, John H.

    2012-01-01

    Highlights: ► We review cost estimation approaches for solid waste management. ► Unit cost method and benchmarking techniques used in industrialising regions (IR). ► Variety in scope, quality and stakeholders makes cost estimation challenging in IR. ► Integrate waste flow and cost models using cost functions to improve cost planning. - Abstract: The importance of cost planning for solid waste management (SWM) in industrialising regions (IR) is not well recognised. The approaches used to estimate costs of SWM can broadly be classified into three categories – the unit cost method, benchmarking techniques and developing cost models using sub-approaches such as cost and production function analysis. These methods have been developed into computer programmes with varying functionality and utility. IR mostly use the unit cost and benchmarking approach to estimate their SWM costs. The models for cost estimation, on the other hand, are used at times in industrialised countries, but not in IR. Taken together, these approaches could be viewed as precedents that can be modified appropriately to suit waste management systems in IR. The main challenges (or problems) one might face while attempting to do so are a lack of cost data, and a lack of quality for what data do exist. There are practical benefits to planners in IR where solid waste problems are critical and budgets are limited.

  17. Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium using existing facilities at Hanford: alternatives 4A/8/10

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium as a ceramic in an existing facility, the Fuels and Materials Examination Facility (FMEF), at Hanford

  18. Predicting Software Projects Cost Estimation Based on Mining Historical Data

    OpenAIRE

    Najadat, Hassan; Alsmadi, Izzat; Shboul, Yazan

    2012-01-01

    In this research, a hybrid cost estimation model is proposed to produce a realistic prediction model that takes into consideration software project, product, process, and environmental elements. A cost estimation dataset is built from a large number of open source projects. Those projects are divided into three domains: communication, finance, and game projects. Several data mining techniques are used to classify software projects in terms of their development complexity. Data mining techniqu...

  19. Applying Insights from Transaction Cost Economics (TCE) to Improve DoD Cost Estimation

    National Research Council Canada - National Science Library

    Angelis, Diana I; Dillard, John; Franck, Raymond; Melese, Francois

    2007-01-01

    The purpose of this report is to explore the possibility of improving DoD cost estimation methods by including explanatory variables that capture the coordination and motivation problems associated with the program...

  20. Cost estimation and economical evaluation of three configurations of activated sludge process for a wastewater treatment plant (WWTP) using simulation

    Science.gov (United States)

    Jafarinejad, Shahryar

    2017-09-01

    The activated sludge (AS) process is a type of suspended growth biological wastewater treatment that is used for treating both municipal sewage and a variety of industrial wastewaters. Economical modeling and cost estimation of activated sludge processes are crucial for designing, construction, and forecasting future economical requirements of wastewater treatment plants (WWTPs). In this study, three configurations containing conventional activated sludge (CAS), extended aeration activated sludge (EAAS), and sequencing batch reactor (SBR) processes for a wastewater treatment plant in Tehran city were proposed and the total project construction, operation labor, maintenance, material, chemical, energy and amortization costs of these WWTPs were calculated and compared. Besides, effect of mixed liquor suspended solid (MLSS) amounts on costs of WWTPs was investigated. Results demonstrated that increase of MLSS decreases the total project construction, material and amortization costs of WWTPs containing EAAS and CAS. In addition, increase of this value increases the total operation, maintenance and energy costs, but does not affect chemical cost of WWTPs containing EAAS and CAS.

  1. Accounting for the relationship between per diem cost and LOS when estimating hospitalization costs.

    Science.gov (United States)

    Ishak, K Jack; Stolar, Marilyn; Hu, Ming-yi; Alvarez, Piedad; Wang, Yamei; Getsios, Denis; Williams, Gregory C

    2012-12-01

    Hospitalization costs in clinical trials are typically derived by multiplying the length of stay (LOS) by an average per-diem (PD) cost from external sources. This assumes that PD costs are independent of LOS. Resource utilization in early days of the stay is usually more intense, however, and thus, the PD cost for a short hospitalization may be higher than for longer stays. The shape of this relationship is unlikely to be linear, as PD costs would be expected to gradually plateau. This paper describes how to model the relationship between PD cost and LOS using flexible statistical modelling techniques. An example based on a clinical study of clevidipine for the treatment of peri-operative hypertension during hospitalizations for cardiac surgery is used to illustrate how inferences about cost-savings associated with good blood pressure (BP) control during the stay can be affected by the approach used to derive hospitalization costs.Data on the cost and LOS of hospitalizations for coronary artery bypass grafting (CABG) from the Massachusetts Acute Hospital Case Mix Database (the MA Case Mix Database) were analyzed to link LOS to PD cost, factoring in complications that may have occurred during the hospitalization or post-discharge. The shape of the relationship between LOS and PD costs in the MA Case Mix was explored graphically in a regression framework. A series of statistical models including those based on simple logarithmic transformation of LOS to more flexible models using LOcally wEighted Scatterplot Smoothing (LOESS) techniques were considered. A final model was selected, using simplicity and parsimony as guiding principles in addition traditional fit statistics (like Akaike's Information Criterion, or AIC). This mapping was applied in ECLIPSE to predict an LOS-specific PD cost, and then a total cost of hospitalization. These were then compared for patients who had good vs. poor peri-operative blood-pressure control. The MA Case Mix dataset included data

  2. Accounting for the relationship between per diem cost and LOS when estimating hospitalization costs

    Directory of Open Access Journals (Sweden)

    Ishak K

    2012-12-01

    Full Text Available Abstract Background Hospitalization costs in clinical trials are typically derived by multiplying the length of stay (LOS by an average per-diem (PD cost from external sources. This assumes that PD costs are independent of LOS. Resource utilization in early days of the stay is usually more intense, however, and thus, the PD cost for a short hospitalization may be higher than for longer stays. The shape of this relationship is unlikely to be linear, as PD costs would be expected to gradually plateau. This paper describes how to model the relationship between PD cost and LOS using flexible statistical modelling techniques. Methods An example based on a clinical study of clevidipine for the treatment of peri-operative hypertension during hospitalizations for cardiac surgery is used to illustrate how inferences about cost-savings associated with good blood pressure (BP control during the stay can be affected by the approach used to derive hospitalization costs. Data on the cost and LOS of hospitalizations for coronary artery bypass grafting (CABG from the Massachusetts Acute Hospital Case Mix Database (the MA Case Mix Database were analyzed to link LOS to PD cost, factoring in complications that may have occurred during the hospitalization or post-discharge. The shape of the relationship between LOS and PD costs in the MA Case Mix was explored graphically in a regression framework. A series of statistical models including those based on simple logarithmic transformation of LOS to more flexible models using LOcally wEighted Scatterplot Smoothing (LOESS techniques were considered. A final model was selected, using simplicity and parsimony as guiding principles in addition traditional fit statistics (like Akaike’s Information Criterion, or AIC. This mapping was applied in ECLIPSE to predict an LOS-specific PD cost, and then a total cost of hospitalization. These were then compared for patients who had good vs. poor peri-operative blood

  3. Fast Reactor Fuel Cycle Cost Estimates for Advanced Fuel Cycle Studies

    International Nuclear Information System (INIS)

    Harrison, Thomas

    2013-01-01

    Presentation Outline: • Why Do I Need a Cost Basis?; • History of the Advanced Fuel Cycle Cost Basis; • Description of the Cost Basis; • Current Work; • Fast Reactor Fuel Cycle Applications; • Sample Fuel Cycle Cost Estimate Analysis; • Future Work

  4. Performance and operational economics estimates for a coal gasification combined-cycle cogeneration powerplant

    Science.gov (United States)

    Nainiger, J. J.; Burns, R. K.; Easley, A. J.

    1982-01-01

    A performance and operational economics analysis is presented for an integrated-gasifier, combined-cycle (IGCC) system to meet the steam and baseload electrical requirements. The effect of time variations in steam and electrial requirements is included. The amount and timing of electricity purchases from sales to the electric utility are determined. The resulting expenses for purchased electricity and revenues from electricity sales are estimated by using an assumed utility rate structure model. Cogeneration results for a range of potential IGCC cogeneration system sizes are compared with the fuel consumption and costs of natural gas and electricity to meet requirements without cogeneration. The results indicate that an IGCC cogeneration system could save about 10 percent of the total fuel energy presently required to supply steam and electrical requirements without cogeneration. Also for the assumed future fuel and electricity prices, an annual operating cost savings of 21 percent to 26 percent could be achieved with such a cogeneration system. An analysis of the effects of electricity price, fuel price, and system availability indicates that the IGCC cogeneration system has a good potential for economical operation over a wide range in these assumptions.

  5. On the evaluation of feed requirements and costs analysis of preirradiated fuel cycle operations for uranium fuelled light water reactors

    International Nuclear Information System (INIS)

    El Osery, I.A.; Yasso, K.A.; Abdel Salam, A.S.

    1982-01-01

    This work is a part of an integrated scheme for nuclear power cost evaluation. The paper gives a brief description of the different operations included to get enriched UO 2 in its final form. A Material Balance Sheet is developed to estimate quantitatively the input material reguirements to each fuel operation. An improved approach for fuel cost analysis is developed. The paper includes a complete FORTRAN listing for the computer program carried out for this purpose together with description of the program input data requirements and output facilities. Illustrative numerical results are provided

  6. Estimated Costs of U.S. Operations in Iraq and Afghanistan and of Other Activities Related to the War on Terrorism

    National Research Council Canada - National Science Library

    Orszag, Peter

    2007-01-01

    .... In addition to totaling the funding provided to date, CBO has projected the total cost over the next 10 years of funding operations in support of the war on terrorism under two scenarios specified by the Chairman...

  7. The application of cost behaviour and estimation in organisational ...

    African Journals Online (AJOL)

    Based on these findings, the paper recommends among others the need for the regular training of the management accountant in the modern methods of cost estimation, the need for accurate keeping of records of transactions and for long term forecasting of cost, management should rely on quantitative factors and ...

  8. PV-BUK: Operating and maintenance costs of photovoltaic installations; PV-BUK - Betriebs- und Unterhaltskosten von PV-Anlagen - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Stettler, S.; Toggweiler, P. [Enecolo AG, Moenchaltorf (Switzerland); Ruoss, D.; Schudel, P. [Envision, Lucerne (Switzerland); Kottmann, A.; Steinle, F. [BE Netz AG, Lucerne (Switzerland)

    2008-03-15

    This final report elaborated for the Swiss Federal Office of Energy (SFOE) takes a look at the results of a project carried out to determine the costs for facility management, to estimate future cost development and to propose activities for the further reduction of the operation and maintenance costs of photovoltaic systems. Information on the cost situation was collected by literature study, as well as in interviews and surveys with photovoltaic (PV) experts and the owners of PV installations. The discussion of the results at a workshop with about 20 Swiss PV experts is noted. The results are presented and discussed. These show that operating costs per kWh decrease with the size of the PV system. Figures are quoted. The major part of the costs are quoted as being those for spare parts, especially for the inverter. The authors are of the opinion that, in future, costs for facility management will further decrease, as they are partly linked to capital and insurance costs. Potential for optimisation is said to exist in several areas of facility management such as, for example, in system monitoring and fast reaction in the case of malfunctions.

  9. Cost of installing and operating an electronic clinical decision support system for maternal health care: case of Tanzania rural primary health centres.

    Science.gov (United States)

    Saronga, Happiness Pius; Dalaba, Maxwell Ayindenaba; Dong, Hengjin; Leshabari, Melkizedeck; Sauerborn, Rainer; Sukums, Felix; Blank, Antje; Kaltschmidt, Jens; Loukanova, Svetla

    2015-04-02

    Poor quality of care is among the causes of high maternal and newborn disease burden in Tanzania. Potential reason for poor quality of care is the existence of a "know-do gap" where by health workers do not perform to the best of their knowledge. An electronic clinical decision support system (CDSS) for maternal health care was piloted in six rural primary health centers of Tanzania to improve performance of health workers by facilitating adherence to World Health Organization (WHO) guidelines and ultimately improve quality of maternal health care. This study aimed at assessing the cost of installing and operating the system in the health centers. This retrospective study was conducted in Lindi, Tanzania. Costs incurred by the project were analyzed using Ingredients approach. These costs broadly included vehicle, computers, furniture, facility, CDSS software, transport, personnel, training, supplies and communication. These were grouped into installation and operation cost; recurrent and capital cost; and fixed and variable cost. We assessed the CDSS in terms of its financial and economic cost implications. We also conducted a sensitivity analysis on the estimations. Total financial cost of CDSS intervention amounted to 185,927.78 USD. 77% of these costs were incurred in the installation phase and included all the activities in preparation for the actual operation of the system for client care. Generally, training made the largest share of costs (33% of total cost and more than half of the recurrent cost) followed by CDSS software- 32% of total cost. There was a difference of 31.4% between the economic and financial costs. 92.5% of economic costs were fixed costs consisting of inputs whose costs do not vary with the volume of activity within a given range. Economic cost per CDSS contact was 52.7 USD but sensitive to discount rate, asset useful life and input cost variations. Our study presents financial and economic cost estimates of installing and operating an

  10. Estimating Power Outage Cost based on a Survey for Industrial Customers

    Science.gov (United States)

    Yoshida, Yoshikuni; Matsuhashi, Ryuji

    A survey was conducted on power outage cost for industrial customers. 5139 factories, which are designated energy management factories in Japan, answered their power consumption and the loss of production value due to the power outage in an hour in summer weekday. The median of unit cost of power outage of whole sectors is estimated as 672 yen/kWh. The sector of services for amusement and hobbies and the sector of manufacture of information and communication electronics equipment relatively have higher unit cost of power outage. Direct damage cost from power outage in whole sectors reaches 77 billion yen. Then utilizing input-output analysis, we estimated indirect damage cost that is caused by the repercussion of production halt. Indirect damage cost in whole sectors reaches 91 billion yen. The sector of wholesale and retail trade has the largest direct damage cost. The sector of manufacture of transportation equipment has the largest indirect damage cost.

  11. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  12. Multiagent-based Distributed Control for Operation Cost Minimization of Droop Controlled DC Microgrid Using Incremental Cost Consensus

    DEFF Research Database (Denmark)

    Li, Chendan; Quintero, Juan Carlos Vasquez; Guerrero, Josep M.

    2015-01-01

    In this paper, a multiagent based distributed control is proposed for DC microgrid to minimize the operation cost. The power of each distributed generator (DG) is dispatched in a distributed manner in a multiagent system by means of voltage scheduling. Every DG unit is taken as an agent......, and they share the load corresponding to the operation cost of all the units in the system with only communication with direct neighbors through incremental cost consensus. The power regulation according to the power reference generated by consensus is implemented through voltage scheduling in local primary...... controllers. Simulation verification shows that total operation cost of the DC microgrid is successfully reduced though the proposed method....

  13. Multiagent based Distributed Control for Operation Cost Minimization of Droop Controlled AC Microgrid Using Incremental Cost Consensus

    DEFF Research Database (Denmark)

    Li, Chendan; Firoozabadi, Mehdi Savaghebi; Quintero, Juan Carlos Vasquez

    2015-01-01

    sharing based on the power rating. With various types of distributed generator (DG) units in the system, factors that closely related to the operation cost, such as fuel cost and efficiencies of the generator should be taken into account in order to improve the efficiency of the whole system....... In this paper, a multiagent based distributed method is proposed to minimize operation cost of the AC microgrid. Each DG is acting as an agent which regulates the power individually using proposed frequency scheduling method. Optimal power command is obtained through carefully designed consensus algorithm...... with only light communication between neighboring agents. Case studies verified that the proposed control strategy can effectively reduce the operation cost....

  14. Cost Estimating in DoD: Current Status, Trends, and What the Future Holds

    National Research Council Canada - National Science Library

    Nussbaum, Daniel A

    2005-01-01

    (1) Current Status: Baseline analysis of current cost estimating community, including which organizations are responsible for developing and reviewing cost estimates, how many personnel there are, what...

  15. Development and application of a model for the analysis of trades between space launch system operations and acquisition costs

    Science.gov (United States)

    Nix, Michael B.

    2005-12-01

    trade-off analyses desired. The minimum turnaround time/maximum labor allocation for specific hardware configurations and characteristics and corresponding asset requirements can be estimated. Either turnaround time or resources can be varied and the resulting operations and acquisition costs can be compared. Asset reliability, wearout and depot maintenance intervals and durations can be varied as well to analyze the effects on costs. Likewise, the effects on operations and acquisitions costs of the introduction of alternative technologies that affect reliability, maintainability and supportability in various hardware configurations can be evaluated.

  16. ESTIMATING THE COST OF AGRICULTURAL MORBIDITY IN MAINE AND NEW HAMPSHIRE.

    Science.gov (United States)

    Jones, Nathan M; Scott, Erika E; Krupa, Nicole; Jenkins, Paul L

    2018-01-29

    This article provides an estimate for the economic costs of agricultural injuries sustained in the states of Maine and New Hampshire between the years 2008 and 2010. The authors used a novel dataset of 562 agriculturally related occupational injuries, and cost estimates were generated using the CDC's Web-based Injury Statistics Query and Reporting System (WISQARS). Individual cases from the dataset that did not match the query options for WISQARS were excluded. Of the 562 agricultural injuries identified in the dataset, 361 met the WISQARS criteria. The remaining 201 cases were judged to be incompatible with the WISQARS query criteria. Significant differences (p 0.0001) were found between the median costs of eight types of injury. Amputations (median = $70,077) and fractures (median = $13,365) were found to be the most expensive types of injury. The total cost of the 361 injuries for which estimates were available was $6,342,270. Injuries that reportedly involved machinery were found to be more expensive than injuries caused by animals. This article highlights the difference in the total cost of injury between types of injuries and demonstrates that agricultural injuries were a significant economic burden for Maine and New Hampshire for the years 2008-2010. These data can be used to direct future preventive efforts. Finally, this article suggests that WISQARS is a powerful tool for estimating injury costs without requiring access to treatment or billing records. Copyright© by the American Society of Agricultural Engineers.

  17. Cost estimation of the decommissioning of nuclear fuel cycle plants

    International Nuclear Information System (INIS)

    Barbe, A.; Pech, R.

    1991-01-01

    Most studies conducted to date on the cost of decommissioning nuclear facilities pertain to reactors. Few such studies have been performed on the cost of decommissioning nuclear fuel cycle plants, particularly spent fuel reprocessing plants. Present operators of these plants nevertheless need to assess such costs, at least in order to include the related expenses in their short-, medium- or long-term projections. They also need to determine now, for example, suitable production costs that the plant owners will have to propose to their customers. Unlike nuclear reactors for which a series effect is involved (PWRs, BWRs, etc.) and where radioactivity is relatively concentrated, industrial-scale reprocessing plants are large, complex installations for which decommissioning is a long and costly operation that requires a special approach. Faced with this problem, Cogema, the owner and operator of the La Hague and Marcoule reprocessing plants in France, called on SGN to assess the total decommissioning costs for its plants. This assessment led SGN to development by SGN engineers of a novel methodology and a computerized calculation model described below. The resulting methodology and model are applicable to other complex nuclear facilities besides reprocessing plants, such as laboratories and nuclear auxiliaries of reactor cores. (author)

  18. Cost of Maple Sap Production for Various Size Tubing Operations

    Science.gov (United States)

    Niel K. Huyler

    2000-01-01

    Reports sap production costs for small (500 to 1,000 taps), medium (1,000 to 5,000), and large (5,000 to 15,000) maple syrup operations that use plastic tubing with vacuum pumping. The average annual operating cost per tap ranged from $4.64 for a 500-tap sugarbush operation to $1.84 for a sugarbush with 10,000 taps. The weighted average was $2.87 per tap or $11.48 per...

  19. Energy efficiency estimation of a steam powered LNG tanker using normal operating data

    Directory of Open Access Journals (Sweden)

    Sinha Rajendra Prasad

    2016-01-01

    Full Text Available A ship’s energy efficiency performance is generally estimated by conducting special sea trials of few hours under very controlled environmental conditions of calm sea, standard draft and optimum trim. This indicator is then used as the benchmark for future reference of the ship’s Energy Efficiency Performance (EEP. In practice, however, for greater part of operating life the ship operates in conditions which are far removed from original sea trial conditions and therefore comparing energy performance with benchmark performance indicator is not truly valid. In such situations a higher fuel consumption reading from the ship fuel meter may not be a true indicator of poor machinery performance or dirty underwater hull. Most likely, the reasons for higher fuel consumption may lie in factors other than the condition of hull and machinery, such as head wind, current, low load operations or incorrect trim [1]. Thus a better and more accurate approach to determine energy efficiency of the ship attributable only to main machinery and underwater hull condition will be to filter out the influence of all spurious and non-standard operating conditions from the ship’s fuel consumption [2]. The author in this paper identifies parameters of a suitable filter to be used on the daily report data of a typical LNG tanker of 33000 kW shaft power to remove effects of spurious and non-standard ship operations on its fuel consumption. The filtered daily report data has been then used to estimate actual fuel efficiency of the ship and compared with the sea trials benchmark performance. Results obtained using data filter show closer agreement with the benchmark EEP than obtained from the monthly mini trials . The data filtering method proposed in this paper has the advantage of using the actual operational data of the ship and thus saving cost of conducting special sea trials to estimate ship EEP. The agreement between estimated results and special sea trials EEP is

  20. Operating Dedicated Data Centers - Is It Cost-Effective?

    Science.gov (United States)

    Ernst, M.; Hogue, R.; Hollowell, C.; Strecker-Kellog, W.; Wong, A.; Zaytsev, A.

    2014-06-01

    The advent of cloud computing centres such as Amazon's EC2 and Google's Computing Engine has elicited comparisons with dedicated computing clusters. Discussions on appropriate usage of cloud resources (both academic and commercial) and costs have ensued. This presentation discusses a detailed analysis of the costs of operating and maintaining the RACF (RHIC and ATLAS Computing Facility) compute cluster at Brookhaven National Lab and compares them with the cost of cloud computing resources under various usage scenarios. An extrapolation of likely future cost effectiveness of dedicated computing resources is also presented.

  1. Treatment Cost Analysis Tool (TCAT) for estimating costs of outpatient treatment services.

    Science.gov (United States)

    Flynn, Patrick M; Broome, Kirk M; Beaston-Blaakman, Aaron; Knight, Danica K; Horgan, Constance M; Shepard, Donald S

    2009-02-01

    A Microsoft Excel-based workbook designed for research analysts to use in a national study was retooled for treatment program directors and financial officers to allocate, analyze, and estimate outpatient treatment costs in the U.S. This instrument can also be used as a planning and management tool to optimize resources and forecast the impact of future changes in staffing, client flow, program design, and other resources. The Treatment Cost Analysis Tool (TCAT) automatically provides feedback and generates summaries and charts using comparative data from a national sample of non-methadone outpatient providers. TCAT is being used by program staff to capture and allocate both economic and accounting costs, and outpatient service costs are reported for a sample of 70 programs. Costs for an episode of treatment in regular, intensive, and mixed types of outpatient treatment were $882, $1310, and $1381 respectively (based on 20% trimmed means and 2006 dollars). An hour of counseling cost $64 in regular, $85 intensive, and $86 mixed. Group counseling hourly costs per client were $8, $11, and $10 respectively for regular, intensive, and mixed. Future directions include use of a web-based interview version, much like some of the commercially available tax preparation software tools, and extensions for use in other modalities of treatment.

  2. State estimation and control for low-cost unmanned aerial vehicles

    CERN Document Server

    Hajiyev, Chingiz; Yenal Vural, Sıtkı

    2015-01-01

    This book discusses state estimation and control procedures for a low-cost unmanned aerial vehicle (UAV). The authors consider the use of robust adaptive Kalman filter algorithms and demonstrate their advantages over the optimal Kalman filter in the context of the difficult and varied environments in which UAVs may be employed. Fault detection and isolation (FDI) and data fusion for UAV air-data systems are also investigated, and control algorithms, including the classical, optimal, and fuzzy controllers, are given for the UAV. The performance of different control methods is investigated and the results compared. State Estimation and Control of Low-Cost Unmanned Aerial Vehicles covers all the important issues for designing a guidance, navigation and control (GNC) system of a low-cost UAV. It proposes significant new approaches that can be exploited by GNC system designers in the future and also reviews the current literature. The state estimation, control and FDI methods are illustrated by examples and MATLAB...

  3. The Indirect Costs of Financial Distress in Indonesia

    Directory of Open Access Journals (Sweden)

    Wijantini Wijantini

    2007-06-01

    Full Text Available This paper presents quantitative estimates of the indirect cost of financial distress and its determinants. In order to measure the cost, this study estimates the annualized changes in industry-adjusted operation profit and sales from a year before the onset of distress to the resolution year. Using those approaches, the median of indirect financial distress cost is estimated between three and 11 percent annually. To the extent that the direct cost of financial distress reduces reported operating income, the estimated costs are overstated. The simple regressions analysis suggest that the indirect cost of financial distress significantly increases with size, leverage, number of creditors, and poor industry performance, but is not related to degree of bank loan reliance. The findings provide a weak support for the financial distress theory which suggests that conflicts of interest render the costs of financial distress.

  4. Study on the Development of Methodology for Cost Calculations and Financial Planning of Decommissioning Operations

    International Nuclear Information System (INIS)

    2001-12-01

    The following study deals with the development of methodology for cost calculations and financial planning of decommissioning operations. It has been carried out by EDF / FRAMATOME / VUJE / SCK-CEN in the frame of the contract B7-032/2000/291058/MAR/C2 awarded by the European Commission. This study consists of 4 parts. The first task objective is to develop a reliable and transparent methodology for cost assessment and financial planning sufficient precise but without long and in depth investigations and studies. This methodology mainly contains: Calculation methods and algorithms for the elaboration of costs items making up the whole decommissioning cost. Estimated or standard values for the parameters and for the cost factors to be used in the above-mentioned algorithms Financial mechanism to be applied as to establish a financial planning. The second part task is the provision of standard values for the different parameters and costs factors described in the above-mentioned algorithms. This provision of data is based on the own various experience acquired by the members of the working team and on existing international references (databases, publications and reports). As decommissioning operations are spreading over several dozens of years, the scope of this task the description of the financial mechanisms to be applied to the different cost items as to establish a complete financial cost. It takes into account the financial schedule issued in task 1. The scope of this task consists in bringing together in a guideline all the information collected before: algorithms, data and financial mechanisms. (A.L.B.)

  5. Estimation of pump operational state with model-based methods

    International Nuclear Information System (INIS)

    Ahonen, Tero; Tamminen, Jussi; Ahola, Jero; Viholainen, Juha; Aranto, Niina; Kestilae, Juha

    2010-01-01

    Pumps are widely used in industry, and they account for 20% of the industrial electricity consumption. Since the speed variation is often the most energy-efficient method to control the head and flow rate of a centrifugal pump, frequency converters are used with induction motor-driven pumps. Although a frequency converter can estimate the operational state of an induction motor without external measurements, the state of a centrifugal pump or other load machine is not typically considered. The pump is, however, usually controlled on the basis of the required flow rate or output pressure. As the pump operational state can be estimated with a general model having adjustable parameters, external flow rate or pressure measurements are not necessary to determine the pump flow rate or output pressure. Hence, external measurements could be replaced with an adjustable model for the pump that uses estimates of the motor operational state. Besides control purposes, modelling the pump operation can provide useful information for energy auditing and optimization purposes. In this paper, two model-based methods for pump operation estimation are presented. Factors affecting the accuracy of the estimation methods are analyzed. The applicability of the methods is verified by laboratory measurements and tests in two pilot installations. Test results indicate that the estimation methods can be applied to the analysis and control of pump operation. The accuracy of the methods is sufficient for auditing purposes, and the methods can inform the user if the pump is driven inefficiently.

  6. Process-Costing, Job-Order-Costing, Operation Costing (også kaldet Batch Costing og Functional Costing - Når Systemtankegangen ligger til grund for økonomistyringen og dens beslutninger)

    DEFF Research Database (Denmark)

    Nielsen, Steen

    2005-01-01

    De tre begreber process-costing, job-order-costing, operation-costing samt functional-based costing er faktisk historiske begreber som stammer langt tilbage i økonomistyringslitteraturen, faktisk tilbage til Scientific Management bevægelsen fra 20'erne og 30'erne. Man kan derfor ikke sige, at disse...... ordreregnskabet, f.eks. som dette er analyseret hos Palle Hansen og Vagn Madsen. Begrebet operational costing anvendes også, men dette dækker i realiteten over, hvordan og hvilke elementer der indgår i hele virksomhedens regnskabs-information-system. Dvs. at dette mere er et spørgsmål om, hvordan systemerne er...... Aktivitets-Baseret Cost Management systemerne. Det er derfor vigtigt dels at kende sin historie på området, dels at gøre sig klart, om de under visse antagelser stadig har deres berettigelse. De samme begreber har også deres pendant til de danske begreber, afdelings- eller funktionsregnskabet samt...

  7. A REVIEW OF ESTIMATION OF SOFTWARE PRODUCTS DEVELOPMENT COSTS

    Directory of Open Access Journals (Sweden)

    Edin Osmanbegović

    2017-01-01

    Full Text Available In the modern business and management of business processes, the standardization of procedures allows the creation of added value, increasing competitiveness and success in the business of an organization. Evaluation of the budget for software development is crucial to the success of an IT project, because the inability to make a realistic assessment leads to inadequate project plans, customer dissatisfaction, poor quality of software products, and reduced profits. In order to minimize such situations, making accurate and reliable software cost estimation should be carried out at all stages of the project life cycle. Although hundreds of research articles focusing on the application of different methods of budget estimates of the software product have been published so far, there is no comprehensive review of the current situation or review of research trends in the budget estimates of the software product. This paper aims to create a framework for estimation of costs of development of software products by providing an overview of the most influential researchers, the most influential articles published in the WoS database, the most used keywords for searching the articles, as well as a review of the estimation techniques used in budget estimates of the software product.

  8. Estimating the costs of induced abortion in Uganda: A model-based analysis

    Science.gov (United States)

    2011-01-01

    Background The demand for induced abortions in Uganda is high despite legal and moral proscriptions. Abortion seekers usually go to illegal, hidden clinics where procedures are performed in unhygienic environments by under-trained practitioners. These abortions, which are usually unsafe, lead to a high rate of severe complications and use of substantial, scarce healthcare resources. This study was performed to estimate the costs associated with induced abortions in Uganda. Methods A decision tree was developed to represent the consequences of induced abortion and estimate the costs of an average case. Data were obtained from a primary chart abstraction study, an on-going prospective study, and the published literature. Societal costs, direct medical costs, direct non-medical costs, indirect (productivity) costs, costs to patients, and costs to the government were estimated. Monte Carlo simulation was used to account for uncertainty. Results The average societal cost per induced abortion (95% credibility range) was $177 ($140-$223). This is equivalent to $64 million in annual national costs. Of this, the average direct medical cost was $65 ($49-86) and the average direct non-medical cost was $19 ($16-$23). The average indirect cost was $92 ($57-$139). Patients incurred $62 ($46-$83) on average while government incurred $14 ($10-$20) on average. Conclusion Induced abortions are associated with substantial costs in Uganda and patients incur the bulk of the healthcare costs. This reinforces the case made by other researchers--that efforts by the government to reduce unsafe abortions by increasing contraceptive coverage or providing safe, legal abortions are critical. PMID:22145859

  9. Estimating healthcare costs of acute gastroenteritis and human campylobacteriosis in Switzerland.

    Science.gov (United States)

    Schmutz, C; Mäusezahl, D; Bless, P J; Hatz, C; Schwenkglenks, M; Urbinello, D

    2017-03-01

    Rising numbers of campylobacteriosis case notifications in Switzerland resulted in an increased attention to acute gastroenteritis (AG) in general. Patients with a laboratory-confirmed Campylobacter infection perceive their disease as severe and around 15% of these patients are hospitalized. This study aimed at estimating healthcare costs due to AG and campylobacteriosis in Switzerland. We used official health statistics, data from different studies and expert opinion for estimating individual treatment costs for patients with different illness severity and for extrapolating overall costs due to AG and campylobacteriosis. We estimated that total Swiss healthcare costs resulting from these diseases amount to €29-45 million annually. Data suggest that patients with AG consulting a physician without a stool diagnostic test account for €9·0-24·2 million, patients with a negative stool test result for Campylobacter spp. for €12·3 million, patients testing positive for Campylobacter spp. for €1·8 million and hospitalized campylobacteriosis patients for €6·5 million/year. Healthcare costs of campylobacteriosis are high and most likely increasing in Switzerland considering that campylobacteriosis case notifications steadily increased in the past decade. Costs and potential cost savings for the healthcare system should be considered when designing sectorial and cross-sectorial interventions to reduce the burden of human campylobacteriosis in Switzerland.

  10. Patient-physician discussions about costs: definitions and impact on cost conversation incidence estimates.

    Science.gov (United States)

    Hunter, Wynn G; Hesson, Ashley; Davis, J Kelly; Kirby, Christine; Williamson, Lillie D; Barnett, Jamison A; Ubel, Peter A

    2016-03-31

    Nearly one in three Americans are financially burdened by their medical expenses. To mitigate financial distress, experts recommend routine physician-patient cost conversations. However, the content and incidence of these conversations are unclear, and rigorous definitions are lacking. We sought to develop a novel set of cost conversation definitions, and determine the impact of definitional variation on cost conversation incidence in three clinical settings. Retrospective, mixed-methods analysis of transcribed dialogue from 1,755 outpatient encounters for routine clinical management of breast cancer, rheumatoid arthritis, and depression, occurring between 2010-2014. We developed cost conversation definitions using summative content analysis. Transcripts were evaluated independently by at least two members of our multi-disciplinary team to determine cost conversation incidence using each definition. Incidence estimates were compared using Pearson's Chi-Square Tests. Three cost conversation definitions emerged from our analysis: (a) Out-of-Pocket (OoP) Cost--discussion of the patient's OoP costs for a healthcare service; (b) Cost/Coverage--discussion of the patient's OoP costs or insurance coverage; (c) Cost of Illness- discussion of financial costs or insurance coverage related to health or healthcare. These definitions were hierarchical; OoP Cost was a subset of Cost/Coverage, which was a subset of Cost of Illness. In each clinical setting, we observed significant variation in the incidence of cost conversations when using different definitions; breast oncology: 16, 22, 24% of clinic visits contained cost conversation (OOP Cost, Cost/Coverage, Cost of Illness, respectively; P cost conversation varied significantly depending on the definition used. Our findings and proposed definitions may assist in retrospective interpretation and prospective design of investigations on this topic.

  11. A Descriptive Evaluation of Automated Software Cost-Estimation Models,

    Science.gov (United States)

    1986-10-01

    Version 1.03D) * PCOC (Version 7.01) - PRICE S • SLIM (Version 1.1) • SoftCost (Version 5. 1) * SPQR /20 (Version 1. 1) - WICOMO (Version 1.3) These...produce detailed GANTT and PERT charts. SPQR /20 is based on a cost model developed at ITT. In addition to cost, schedule, and staffing estimates, it...cases and test runs required, and the effectiveness of pre-test and test activities. SPQR /20 also predicts enhancement and maintenance activities. C

  12. Estimating the Cost of Youth Disengagement in New Zealand

    OpenAIRE

    Gail Pacheco; Jessica Dye

    2013-01-01

    Youth exclusion, disengagement, and overall underutilisation in the labour market has short term costs to the economy, as well as long term impacts on society. In this research we project the loss to productivity, measured in foregone wages, and the expected cost to public finances for NZ and Auckland youth aged 15-24 not in employment, education, or training (collectively known as NEET). We estimate the expected per capita cost of each NEET youth in NZ is approximately $26,847 over the next ...

  13. Operations and Modeling Analysis

    Science.gov (United States)

    Ebeling, Charles

    2005-01-01

    The Reliability and Maintainability Analysis Tool (RMAT) provides NASA the capability to estimate reliability and maintainability (R&M) parameters and operational support requirements for proposed space vehicles based upon relationships established from both aircraft and Shuttle R&M data. RMAT has matured both in its underlying database and in its level of sophistication in extrapolating this historical data to satisfy proposed mission requirements, maintenance concepts and policies, and type of vehicle (i.e. ranging from aircraft like to shuttle like). However, a companion analyses tool, the Logistics Cost Model (LCM) has not reached the same level of maturity as RMAT due, in large part, to nonexistent or outdated cost estimating relationships and underlying cost databases, and it's almost exclusive dependence on Shuttle operations and logistics cost input parameters. As a result, the full capability of the RMAT/LCM suite of analysis tools to take a conceptual vehicle and derive its operations and support requirements along with the resulting operating and support costs has not been realized.

  14. Cost-effectiveness of Crohn’s disease post-operative care

    Science.gov (United States)

    Wright, Emily K; Kamm, Michael A; Dr Cruz, Peter; Hamilton, Amy L; Ritchie, Kathryn J; Bell, Sally J; Brown, Steven J; Connell, William R; Desmond, Paul V; Liew, Danny

    2016-01-01

    AIM: To define the cost-effectiveness of strategies, including endoscopy and immunosuppression, to prevent endoscopic recurrence of Crohn’s disease following intestinal resection. METHODS: In the “POCER” study patients undergoing intestinal resection were treated with post-operative drug therapy. Two thirds were randomized to active care (6 mo colonoscopy and drug intensification for endoscopic recurrence) and one third to drug therapy without early endoscopy. Colonoscopy at 18 mo and faecal calprotectin (FC) measurement were used to assess disease recurrence. Administrative data, chart review and patient questionnaires were collected prospectively over 18 mo. RESULTS: Sixty patients (active care n = 43, standard care n = 17) were included from one health service. Median total health care cost was $6440 per patient. Active care cost $4824 more than standard care over 18 mo. Medication accounted for 78% of total cost, of which 90% was for adalimumab. Median health care cost was higher for those with endoscopic recurrence compared to those in remission [$26347 (IQR 25045-27485) vs $2729 (IQR 1182-5215), P cost by $1010 per patient over 18 mo. Active care was associated with 18% decreased endoscopic recurrence, costing $861 for each recurrence prevented. CONCLUSION: Post-operative management strategies are associated with high cost, primarily medication related. Calprotectin use reduces costs. The long term cost-benefit of these strategies remains to be evaluated. PMID:27076772

  15. Selected Tether Applications Cost Model

    Science.gov (United States)

    Keeley, Michael G.

    1988-01-01

    Diverse cost-estimating techniques and data combined into single program. Selected Tether Applications Cost Model (STACOM 1.0) is interactive accounting software tool providing means for combining several independent cost-estimating programs into fully-integrated mathematical model capable of assessing costs, analyzing benefits, providing file-handling utilities, and putting out information in text and graphical forms to screen, printer, or plotter. Program based on Lotus 1-2-3, version 2.0. Developed to provide clear, concise traceability and visibility into methodology and rationale for estimating costs and benefits of operations of Space Station tether deployer system.

  16. Methods for cost estimation in software project management

    Science.gov (United States)

    Briciu, C. V.; Filip, I.; Indries, I. I.

    2016-02-01

    The speed in which the processes used in software development field have changed makes it very difficult the task of forecasting the overall costs for a software project. By many researchers, this task has been considered unachievable, but there is a group of scientist for which this task can be solved using the already known mathematical methods (e.g. multiple linear regressions) and the new techniques as genetic programming and neural networks. The paper presents a solution for building a model for the cost estimation models in the software project management using genetic algorithms starting from the PROMISE datasets related COCOMO 81 model. In the first part of the paper, a summary of the major achievements in the research area of finding a model for estimating the overall project costs is presented together with the description of the existing software development process models. In the last part, a basic proposal of a mathematical model of a genetic programming is proposed including here the description of the chosen fitness function and chromosome representation. The perspective of model described it linked with the current reality of the software development considering as basis the software product life cycle and the current challenges and innovations in the software development area. Based on the author's experiences and the analysis of the existing models and product lifecycle it was concluded that estimation models should be adapted with the new technologies and emerging systems and they depend largely by the chosen software development method.

  17. Real time estimation of photovoltaic modules characteristics and its application to maximum power point operation

    Energy Technology Data Exchange (ETDEWEB)

    Garrigos, Ausias; Blanes, Jose M.; Carrasco, Jose A. [Area de Tecnologia Electronica, Universidad Miguel Hernandez de Elche, Avda. de la Universidad s/n, 03202 Elche, Alicante (Spain); Ejea, Juan B. [Departamento de Ingenieria Electronica, Universidad de Valencia, Avda. Dr Moliner 50, 46100 Valencia, Valencia (Spain)

    2007-05-15

    In this paper, an approximate curve fitting method for photovoltaic modules is presented. The operation is based on solving a simple solar cell electrical model by a microcontroller in real time. Only four voltage and current coordinates are needed to obtain the solar module parameters and set its operation at maximum power in any conditions of illumination and temperature. Despite its simplicity, this method is suitable for low cost real time applications, as control loop reference generator in photovoltaic maximum power point circuits. The theory that supports the estimator together with simulations and experimental results are presented. (author)

  18. Distribution costs -- the cost of local delivery

    International Nuclear Information System (INIS)

    Winger, N.; Zarnett, P.; Carr, J.

    2000-01-01

    Most of the power transmission system in the province of Ontario is owned and operated as a regulated monopoly by Ontario Hydro Services Company (OHSC). Local distribution systems deliver to end-users from bulk supply points within a service territory. OHSC distributes to approximately one million, mostly rural customers, while the approximately 250 municipal utilities together serve about two million, mostly urban customers. Under the Energy Competition Act of 1998 local distribution companies will face some new challenges, including unbundled billing systems, a broader range of distribution costs, increased costs, made up of corporate taxes or payments in lieu of taxes and added costs for regulatory affairs. The consultants provide a detailed discussion of the components of distribution costs, the three components of the typical budget process (capital expenditures, (CAPEX), operating and maintenance (O and M) and administration and corporate (GA and C), a summary of some typical distribution costs in Ontario, and the estimated impacts of the Energy Competition Act (ECA) compliance on charges and rates. Various mitigation strategies are also reviewed. Among these are joint ventures by local distribution companies to reduce ECA compliance costs, re-examination of controllable costs, temporary reduction of the allowable return on equity (ROE) by 50 per cent, and/or reducing the competitive transition charge (CTC). It is estimated that either one of these two reductions could eliminate the full amount of the five to seven per cent uplift in delivered energy service costs. The conclusion of the consultants is that local distribution delivery charges will make up a greater proportion of end-user cost in the future than it has in the past. An increase to customers of about five per cent is expected when the competitive electricity market opens and unbundled billing begins. The cost increase could be mitigated by a combination of actions that would be needed for about

  19. Understanding Costs of Care in the Operating Room.

    Science.gov (United States)

    Childers, Christopher P; Maggard-Gibbons, Melinda

    2018-04-18

    Increasing value requires improving quality or decreasing costs. In surgery, estimates for the cost of 1 minute of operating room (OR) time vary widely. No benchmark exists for the cost of OR time, nor has there been a comprehensive assessment of what contributes to OR cost. To calculate the cost of 1 minute of OR time, assess cost by setting and facility characteristics, and ascertain the proportion of costs that are direct and indirect. This cross-sectional and longitudinal analysis examined annual financial disclosure documents from all comparable short-term general and specialty care hospitals in California from fiscal year (FY) 2005 to FY2014 (N = 3044; FY2014, n = 302). The analysis focused on 2 revenue centers: (1) surgery and recovery and (2) ambulatory surgery. Mean cost of 1 minute of OR time, stratified by setting (inpatient vs ambulatory), teaching status, and hospital ownership. The proportion of cost attributable to indirect and direct expenses was identified; direct expenses were further divided into salary, benefits, supplies, and other direct expenses. In FY2014, a total of 175 of 302 facilities (57.9%) were not for profit, 78 (25.8%) were for profit, and 49 (16.2%) were government owned. Thirty facilities (9.9%) were teaching hospitals. The mean (SD) cost for 1 minute of OR time across California hospitals was $37.45 ($16.04) in the inpatient setting and $36.14 ($19.53) in the ambulatory setting (P = .65). There were no differences in mean expenditures when stratifying by ownership or teaching status except that teaching hospitals had lower mean (SD) expenditures than nonteaching hospitals in the inpatient setting ($29.88 [$9.06] vs $38.29 [$16.43]; P = .006). Direct expenses accounted for 54.6% of total expenses ($20.40 of $37.37) in the inpatient setting and 59.1% of total expenses ($20.90 of $35.39) in the ambulatory setting. Wages and benefits accounted for approximately two-thirds of direct expenses (inpatient, $14.00 of $20

  20. Ventilation cost and air cleaning

    Science.gov (United States)

    Goodfellow, H. D.

    The components associated with the costs of the purchase of pollution control equipment are discussed. These include the capital cost to purchase the equipment and installation, and the costs incurred to operate the control device on an annual basis. Although the capital costs can represent a significant outlay of money, typically these costs are spread out over the life of the equipment. In general, this amortized cost is combined with the operating cost and is referred to as an 'annualized cost'. The annualized cost is a commonly used indicator to demonstrate the actual year to year cost that the equipment and operation will represent. Values and methods used to estimate costs, typical cost indicators, and sources of computerized costing models are presented. A comparison of the capital cost expenditure required for a model case (a cement kiln operation), using three control device alternatives is made.

  1. Validation of generic cost estimates for construction-related activities at nuclear power plants: Final report

    International Nuclear Information System (INIS)

    Simion, G.; Sciacca, F.; Claiborne, E.; Watlington, B.; Riordan, B.; McLaughlin, M.

    1988-05-01

    This report represents a validation study of the cost methodologies and quantitative factors derived in Labor Productivity Adjustment Factors and Generic Methodology for Estimating the Labor Cost Associated with the Removal of Hardware, Materials, and Structures From Nuclear Power Plants. This cost methodology was developed to support NRC analysts in determining generic estimates of removal, installation, and total labor costs for construction-related activities at nuclear generating stations. In addition to the validation discussion, this report reviews the generic cost analysis methodology employed. It also discusses each of the individual cost factors used in estimating the costs of physical modifications at nuclear power plants. The generic estimating approach presented uses the /open quotes/greenfield/close quotes/ or new plant construction installation costs compiled in the Energy Economic Data Base (EEDB) as a baseline. These baseline costs are then adjusted to account for labor productivity, radiation fields, learning curve effects, and impacts on ancillary systems or components. For comparisons of estimated vs actual labor costs, approximately four dozen actual cost data points (as reported by 14 nuclear utilities) were obtained. Detailed background information was collected on each individual data point to give the best understanding possible so that the labor productivity factors, removal factors, etc., could judiciously be chosen. This study concludes that cost estimates that are typically within 40% of the actual values can be generated by prudently using the methodologies and cost factors investigated herein

  2. Estimating cost per lane mile for routine highway operations and maintenance

    Science.gov (United States)

    2011-01-01

    The disparity between maintenance budgets and maintenance requirements causes agencies to make difficult choices : about maintenance priorities. There is a growing need to effectively link maintenance costs and condition to provide clear : evidence o...

  3. Droop Scheme With Consideration of Operating Costs

    DEFF Research Database (Denmark)

    Nutkani, I. U.; Loh, Poh Chiang; Blaabjerg, Frede

    2014-01-01

    considered even though they are different for different types of DGs. This letter thus proposes an alternative droop scheme, which can better distinguish the different operating characteristics and objectives of the DGs grouped together in a weighted droop expression. The power sharing arrived in the steady...... state will meet the intended objectives, as demonstrated in the experiment with a defined objective of minimizing the total microgrid operating cost....

  4. Cost-effectiveness estimates for antenatal HIV testing in the Netherlands

    NARCIS (Netherlands)

    Rozenbaum, M. H.; Verweel, G.; Folkerts, D. K. F.; Dronkers, F.; van den Hoek, J. A. R.; Hartwig, N. G.; de Groot, R.; Postma, M. J.

    2008-01-01

    This paper provides an estimation of the lifetime health-care cost of HIV-infected children and an update of the cost-effectiveness of universal HIV-screening of pregnant women in Amsterdam (The Netherlands). During 2003-2005, we collected data concerning the prevalence of newly diagnosed

  5. [Cost estimation of an epidemiological surveillance network for animal diseases in Central Africa: a case study of the Chad network].

    Science.gov (United States)

    Ouagal, M; Berkvens, D; Hendrikx, P; Fecher-Bourgeois, F; Saegerman, C

    2012-12-01

    In sub-Saharan Africa, most epidemiological surveillance networks for animal diseases were temporarily funded by foreign aid. It should be possible for national public funds to ensure the sustainability of such decision support tools. Taking the epidemiological surveillance network for animal diseases in Chad (REPIMAT) as an example, this study aims to estimate the network's cost by identifying the various costs and expenditures for each level of intervention. The network cost was estimated on the basis of an analysis of the operational organisation of REPIMAT, additional data collected in surveys and interviews with network field workers and a market price listing for Chad. These costs were then compared with those of other epidemiological surveillance networks in West Africa. The study results indicate that REPIMAT costs account for 3% of the State budget allocated to the Ministry of Livestock. In Chad in general, as in other West African countries, fixed costs outweigh variable costs at every level of intervention. The cost of surveillance principally depends on what is needed for surveillance at the local level (monitoring stations) and at the intermediate level (official livestock sectors and regional livestock delegations) and on the cost of the necessary equipment. In African countries, the cost of surveillance per square kilometre depends on livestock density.

  6. Life cycle cost and risk estimation of environmental management options

    International Nuclear Information System (INIS)

    Shropshire, D.; Sherick, M.

    1996-01-01

    The evaluation process is demonstrated in this paper through comparative analysis of two alternative scenarios identified for the management of the alpha-contaminated fixed low-level waste currently stored at INEL. These two scenarios, the Base Case and the Delay Case, are realistic and based on actual data, but are not intended to exactly match actual plans currently being developed at INEL. Life cycle cost estimates were developed for both scenarios using the System Cost Model; resulting costs are presented and compared. Life cycle costs are shown as a function of time and also aggregated by pretreatment, treatment, storage, and disposal activities. Although there are some short-term cost savings for the Delay Case, cumulative life cycle costs eventually become much higher than costs for the Base Case over the same period of time, due mainly to the storage and repackaging necessary to accommodate the longer Delay Case schedule. Life cycle risk estimates were prepared using a new risk analysis method adapted to the System Cost Model architecture for automated, systematic cost/risk applications. Relative risk summaries are presented for both scenarios as a function of time and also aggregated by pretreatment, treatment, storage, and disposal activities. Relative risk of the Delay Case is shown to be higher than that of the Base Case. Finally, risk and cost results are combined to show how the collective information can be used to help identify opportunities for risk or cost reduction and highlight areas where risk reduction can be achieved most economically

  7. Operational strategy and marginal costs in simple trigeneration systems

    International Nuclear Information System (INIS)

    Lozano, M.A.; Carvalho, M.; Serra, L.M.

    2009-01-01

    As a direct result of economic pressures to cut expenses, as well as the legal obligation to reduce emissions, companies and businesses are seeking ways to use energy more efficiently. Trigeneration systems (CHCP: Combined Heating, Cooling and Power generation) allow greater operational flexibility at sites with a variable demand for energy in the form of heating and cooling. This is particularly relevant in buildings where the need for heating is restricted to a few winter months. In summer, the absorption chillers make use of the cogenerated heat to produce chilled water, avoiding waste heat discharge. The operation of a simple trigeneration system is analyzed in this paper. The system is interconnected to the electric utility grid, both to receive electricity and to deliver surplus electricity. For any given demand required by the users, a great number of operating conditions are possible. A linear programming model provides the operational mode with the lowest variable cost. A thermoeconomic analysis, based on marginal production costs, is used to obtain unit costs for internal energy flows and final products as well as to explain the best operational strategy as a function of the demand for energy services and the prices of the resources consumed. (author)

  8. Cost comparison of transcatheter and operative closures of ostium secundum atrial septal defects

    Science.gov (United States)

    O’Byrne, Michael L.; Gillespie, Matthew J.; Shinohara, Russell T.; Dori, Yoav; Rome, Jonathan J.; Glatz, Andrew C.

    2015-01-01

    Background Clinical outcomes for transcatheter and operative closures of atrial septal defects (ASDs) are similar. Economic cost for each method has not been well described. Methods A single-center retrospective cohort study of children and adults cost of operative and transcatheter closures of ASD. A propensity score weight-adjusted multivariate regression model was used in an intention-to-treat analysis. Costs for reintervention and crossover admissions were included in primary analysis. Results A total of 244 subjects were included in the study (64% transcatheter and 36% operative), of which 2% (n = 5) were ≥18 years. Crossover rate from transcatheter to operative group was 3%. Risk of reintervention (P = .66) and 30-day mortality (P = .37) were not significantly different. In a multivariate model, adjusted cost of operative closure was 2012 US $60,992 versus 2012 US $55,841 for transcatheter closure (P cost favoring transcatheter closure were length of stay, medications, and follow-up radiologic and laboratory testing, overcoming higher costs of procedure and echocardiography. Professional costs did not differ. The rate of 30-day readmission was greater in the operative cohort, further increasing the cost advantage of transcatheter closure. Sensitivity analyses demonstrated that costs of follow-up visits influenced relative cost but that device closure remained favorable over a broad range of crossover and reintervention rates. Conclusion For single secundum ASD, cost comparison analysis favors transcatheter closure over the short term. The cost of follow-up regimens influences the cost advantage of transcatheter closure. PMID:25965721

  9. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  10. IVF cycle cost estimation using Activity Based Costing and Monte Carlo simulation.

    Science.gov (United States)

    Cassettari, Lucia; Mosca, Marco; Mosca, Roberto; Rolando, Fabio; Costa, Mauro; Pisaturo, Valerio

    2016-03-01

    The Authors present a new methodological approach in stochastic regime to determine the actual costs of an healthcare process. The paper specifically shows the application of the methodology for the determination of the cost of an Assisted reproductive technology (ART) treatment in Italy. The reason of this research comes from the fact that deterministic regime is inadequate to implement an accurate estimate of the cost of this particular treatment. In fact the durations of the different activities involved are unfixed and described by means of frequency distributions. Hence the need to determine in addition to the mean value of the cost, the interval within which it is intended to vary with a known confidence level. Consequently the cost obtained for each type of cycle investigated (in vitro fertilization and embryo transfer with or without intracytoplasmic sperm injection), shows tolerance intervals around the mean value sufficiently restricted as to make the data obtained statistically robust and therefore usable also as reference for any benchmark with other Countries. It should be noted that under a methodological point of view the approach was rigorous. In fact it was used both the technique of Activity Based Costing for determining the cost of individual activities of the process both the Monte Carlo simulation, with control of experimental error, for the construction of the tolerance intervals on the final result.

  11. Cost analysis guidelines

    International Nuclear Information System (INIS)

    Strait, R.S.

    1996-01-01

    The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy's (DOE's) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies

  12. Good Manufacturing Practices (GMP) manufacturing of advanced therapy medicinal products: a novel tailored model for optimizing performance and estimating costs.

    Science.gov (United States)

    Abou-El-Enein, Mohamed; Römhild, Andy; Kaiser, Daniel; Beier, Carola; Bauer, Gerhard; Volk, Hans-Dieter; Reinke, Petra

    2013-03-01

    Advanced therapy medicinal products (ATMP) have gained considerable attention in academia due to their therapeutic potential. Good Manufacturing Practice (GMP) principles ensure the quality and sterility of manufacturing these products. We developed a model for estimating the manufacturing costs of cell therapy products and optimizing the performance of academic GMP-facilities. The "Clean-Room Technology Assessment Technique" (CTAT) was tested prospectively in the GMP facility of BCRT, Berlin, Germany, then retrospectively in the GMP facility of the University of California-Davis, California, USA. CTAT is a two-level model: level one identifies operational (core) processes and measures their fixed costs; level two identifies production (supporting) processes and measures their variable costs. The model comprises several tools to measure and optimize performance of these processes. Manufacturing costs were itemized using adjusted micro-costing system. CTAT identified GMP activities with strong correlation to the manufacturing process of cell-based products. Building best practice standards allowed for performance improvement and elimination of human errors. The model also demonstrated the unidirectional dependencies that may exist among the core GMP activities. When compared to traditional business models, the CTAT assessment resulted in a more accurate allocation of annual expenses. The estimated expenses were used to set a fee structure for both GMP facilities. A mathematical equation was also developed to provide the final product cost. CTAT can be a useful tool in estimating accurate costs for the ATMPs manufactured in an optimized GMP process. These estimates are useful when analyzing the cost-effectiveness of these novel interventions. Copyright © 2013 International Society for Cellular Therapy. Published by Elsevier Inc. All rights reserved.

  13. The relationship between cost estimates reliability and BIM adoption: SEM analysis

    Science.gov (United States)

    Ismail, N. A. A.; Idris, N. H.; Ramli, H.; Rooshdi, R. R. Raja Muhammad; Sahamir, S. R.

    2018-02-01

    This paper presents the usage of Structural Equation Modelling (SEM) approach in analysing the effects of Building Information Modelling (BIM) technology adoption in improving the reliability of cost estimates. Based on the questionnaire survey results, SEM analysis using SPSS-AMOS application examined the relationships between BIM-improved information and cost estimates reliability factors, leading to BIM technology adoption. Six hypotheses were established prior to SEM analysis employing two types of SEM models, namely the Confirmatory Factor Analysis (CFA) model and full structural model. The SEM models were then validated through the assessment on their uni-dimensionality, validity, reliability, and fitness index, in line with the hypotheses tested. The final SEM model fit measures are: P-value=0.000, RMSEA=0.0790.90, TLI=0.956>0.90, NFI=0.935>0.90 and ChiSq/df=2.259; indicating that the overall index values achieved the required level of model fitness. The model supports all the hypotheses evaluated, confirming that all relationship exists amongst the constructs are positive and significant. Ultimately, the analysis verified that most of the respondents foresee better understanding of project input information through BIM visualization, its reliable database and coordinated data, in developing more reliable cost estimates. They also perceive to accelerate their cost estimating task through BIM adoption.

  14. First estimates of the potential cost and cost saving of protecting childhood hearing from damage caused by congenital CMV infection.

    Science.gov (United States)

    Williams, Eleri J; Gray, Joanne; Luck, Suzanne; Atkinson, Claire; Embleton, Nicholas D; Kadambari, Seilesh; Davis, Adrian; Griffiths, Paul; Sharland, Mike; Berrington, Janet E; Clark, Julia E

    2015-11-01

    Congenital cytomegalovirus (cCMV) is an important cause of childhood deafness, which is modifiable if diagnosed within the first month of life. Targeted screening of infants who do not pass their newborn hearing screening tests in England is a feasible approach to identify and treat cases to improve hearing outcome. To conduct a cost analysis of targeted screening and subsequent treatment for cCMV-related sensorineural hearing loss (SNHL) in an, otherwise, asymptomatic infant, from the perspective of the UK National Health Service (NHS). Using data from the newborn hearing screening programme (NHSP) in England and a recent study of targeted screening for cCMV using salivary swabs within the NHSP, we estimate the cost (in UK pounds (£)) to the NHS. The cost of screening (time, swabs and PCR), assessing, treating and following up cases is calculated. The cost per case of preventing hearing deterioration secondary to cCMV with targeted screening is calculated. The cost of identifying, assessing and treating a case of cCMV-related SNHL through targeted cCMV screening is estimated to be £6683. The cost of improving hearing outcome for an infant with cCMV-related SNHL through targeted screening and treatment is estimated at £14 202. The costs of targeted screening for cCMV using salivary swabs integrated within NHSP resulted in an estimate of cost per case that compares favourably with other screening programmes. This could be used in future studies to estimate the full economic value in terms of incremental costs and incremental health benefits. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  15. Production of solidified high level wastes: a cost comparison of solidification processes

    International Nuclear Information System (INIS)

    1977-06-01

    Differential cost estimates of the annual operating and maintenance costs and the capital costs for five HLW Waste Solidification Alternates were developed. The annual operating and maintenance cost estimates included the cost of labor, consumables, utilities, shipping casks, shipping and disposal at a federal repository. The capital cost included the cost of the component, installation and building. The differential cost estimates do not include equipment and facilities which are either shared with the reprocessing facility or are common between all of the alternates. Total annual cost differential between the five waste form alternates is summarized in tabular form. The Borosilicate Glass Alternate has the lowest total annual cost. The other alternates have higher costs which range from $6.6 M to $7.4 M per year higher than the Glass alternate with the Supercalcine being the highest cost at $7.4 M per year differential. The major items in the cost estimates are then disposal costs in the operating cost estimates and the HLW Storage Tanks in the capital cost estimates. The Supercalcine Multibarrier Alternate ships 180 canisters per year more than the other alternates and consequently has a significantly higher operating cost. However, off-setting this the Supercalcine Multibarrier Alternate does not require HLW Storage Tanks for decay because of the high heat conductivity of this product and correspondingly the capital cost for this alternate is significantly lower than the other alternates. The radiological risk values are correlated with the cost evaluation normalized to cost ($)/MWe-yr

  16. The economic costs of radiation-induced health effects: Estimation and simulation

    International Nuclear Information System (INIS)

    Nieves, L.A.; Tawil, J.J.

    1988-08-01

    This effort improves the quantitative information available for use in evaluating actions that alter health risks due to population exposure to ionizing radiation. To project the potential future costs of changes in health effects risks, Pacific Northwest Laboratory (PNL) constructed a probabilistic computer model, Health Effects Costs Model (HECOM), which utilizes the health effect incidence estimates from accident consequences models to calculate the discounted sum of the economic costs associated with population exposure to ionizing radiation. Application of HECOM to value-impact and environmental impact analyses should greatly increase the quality of the information available for regulatory decision making. Three major types of health effects present risks for any population sustaining a significant radiation exposure: acute radiation injuries (and fatalities), latent cancers, and impairments due to genetic effects. The literature pertaining to both incidence and treatment of these health effects was reviewed by PNL and provided the basis for developing economic cost estimates. The economic costs of health effects estimated by HECOM represent both the value of resources consumed in diagnosing, treating, and caring for the patient and the value of goods not produced because of illness or premature death due to the health effect. Additional costs to society, such as pain and suffering, are not included in the PNL economic cost measures since they do not divert resources from other uses, are difficult to quantify, and do not have a value observable in the marketplace. 83 refs., 3 figs., 19 tabs

  17. The economic costs of radiation-induced health effects: Estimation and simulation

    Energy Technology Data Exchange (ETDEWEB)

    Nieves, L.A.; Tawil, J.J.

    1988-08-01

    This effort improves the quantitative information available for use in evaluating actions that alter health risks due to population exposure to ionizing radiation. To project the potential future costs of changes in health effects risks, Pacific Northwest Laboratory (PNL) constructed a probabilistic computer model, Health Effects Costs Model (HECOM), which utilizes the health effect incidence estimates from accident consequences models to calculate the discounted sum of the economic costs associated with population exposure to ionizing radiation. Application of HECOM to value-impact and environmental impact analyses should greatly increase the quality of the information available for regulatory decision making. Three major types of health effects present risks for any population sustaining a significant radiation exposure: acute radiation injuries (and fatalities), latent cancers, and impairments due to genetic effects. The literature pertaining to both incidence and treatment of these health effects was reviewed by PNL and provided the basis for developing economic cost estimates. The economic costs of health effects estimated by HECOM represent both the value of resources consumed in diagnosing, treating, and caring for the patient and the value of goods not produced because of illness or premature death due to the health effect. Additional costs to society, such as pain and suffering, are not included in the PNL economic cost measures since they do not divert resources from other uses, are difficult to quantify, and do not have a value observable in the marketplace. 83 refs., 3 figs., 19 tabs.

  18. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  19. A Deterministic and Probabilistic Cost Estimate for Nuclear Power Plants

    International Nuclear Information System (INIS)

    Ha, Gag Kyeon; Kwon, Jong Jooh

    2005-01-01

    There are many cost estimate methodologies for some future projects. Revenue Requirement Method (RRM), Cost/Benefit Ratio method, Return on Investment, Pay Back Period Method. etc. This paper uses the RRM method which is the amount of revenue that must be collected from customers to compensate a utility for all expenditures associated with implementing an alternative decision involving money. This RRM can be combined with a random sampling statistical simulation computer program to calculated the Probability Distribution Functions(PDF) of the cost elements for generating cost. EPRI developed this combined statistical techniques into RRM, named Statistical Revenue Requirement Method(SRRM). The statistical technique is a random sampling statistical simulation. The simulation tool is usually Monte Carlo sampling, Latin Latin Hypercube sampling, etc. SRRM is used to estimating for future power plants, apartments, hospital, marketing, etc. In this paper, RRM calculation and SRRM simulation have been practiced for PWR1400MWe nuclear power plants

  20. Implementation of the ANNs ensembles in macro-BIM cost estimates of buildings' floor structural frames

    Science.gov (United States)

    Juszczyk, Michał

    2018-04-01

    This paper reports some results of the studies on the use of artificial intelligence tools for the purposes of cost estimation based on building information models. A problem of the cost estimates based on the building information models on a macro level supported by the ensembles of artificial neural networks is concisely discussed. In the course of the research a regression model has been built for the purposes of cost estimation of buildings' floor structural frames, as higher level elements. Building information models are supposed to serve as a repository of data used for the purposes of cost estimation. The core of the model is the ensemble of neural networks. The developed model allows the prediction of cost estimates with satisfactory accuracy.

  1. Estimated cost of asthma in outpatient treatment: a real-world study

    Science.gov (United States)

    Costa, Eduardo; Caetano, Rosangela; Werneck, Guilherme Loureiro; Bregman, Maurício; Araújo, Denizar Vianna; Rufino, Rogério

    2018-01-01

    ABSTRACT OBJECTIVE To estimate the cost of diagnosis and treatment of asthma. METHODS We used the perspective of society. We sequentially included for 12 months, in 2011-2012, 117 individuals over five years of age who were treated for asthma in the Pneumology and Allergy-Immunology Services of the Piquet Carneiro Polyclinic, Universidade do Estado do Rio de Janeiro. All of them were interviewed twice with a six-month interval for data collection, covering 12 months. The cost units were identified and valued according to defined methods. We carried out a sensitivity analysis and applied statistical methods with a significance level of 5% for cost comparisons between subgroups. RESULTS The study consisted of 108 patients, and 73.8% of them were women. Median age was 49.5 years. Rhinitis was present in 83.3% of the individuals, and more than half were overweight or obese. Mean family income was U$915.90/month (SD = 879.12). Most workers and students had absenteeism related to asthma. Total annual mean cost was U$1,291.20/patient (SD = 1,298.57). The cost related to isolated asthma was U$1,155.43/patient-year (SD = 1,305.58). Obese, severe, and uncontrolled asthmatic patients had higher costs than non-obese, non-severe, and controlled asthmatics, respectively. Severity and control level were independently associated with higher cost (p = 0.001 and 0.000, respectively). The direct cost accounted for 82.3% of the estimated total cost. The cost of medications for asthma accounted for 62.2% of the direct costs of asthma. CONCLUSIONS Asthma medications, environmental control measures, and long-term health leaves had the greatest potential impact on total cost variation. The results are an estimate of the cost of treating asthma at a secondary level in the Brazilian Unified Health System, assuming that the treatment used represents the ideal approach to the disease. PMID:29641652

  2. French Reed Bed as a Solution to Minimize the Operational and Maintenance Costs of Wastewater Treatment from a Small Settlement: An Italian Example

    Directory of Open Access Journals (Sweden)

    Anacleto Rizzo

    2018-02-01

    Full Text Available French Reed Bed (FRB is a particular constructed wetland (CW solution which receives raw wastewater. Data from the full-scale FRB wastewater treatment plant of Castelluccio di Norcia (center of Italy were collected to show the FRB capability to minimize the operational and management (O&M costs. The system was designed to treat wastewater variable from 200 person equivalent (PE in off-season up to 1000 PE. Data from 2014 up to 2016 showed high removal efficiency in line with French experiences with FRBs. An interview was conducted with the Water Utility to estimate the operational and maintenance (O&M costs faced by the WWTP, which allowed us to detail the O&M costs for energy consumption, water quality samples, and personnel for inspection. Other O&M expenditure items were estimated on the basis of parametric costs from the executive design. The FRB O&M costs in euro for 500–1000 PE (6–11 € PE−1 year−1 resulted from 5 to 13 lower in comparison to those reported for classical activated sludge systems in an Italian context (45–90 € year−1. The low O&M costs are mainly due to the limited energy consumed and to the minimized costs of sludge management.

  3. Controlling Campylobacter in the chicken meat chain; Estimation of intervention costs

    OpenAIRE

    Mangen, M.J.J.; Havelaar, A.H.; Poppe, K.J.

    2005-01-01

    Campylobacter infections are a serious public health problem in the Netherlands. As a part of the CARMA project, this study focus on the estimation of the potential direct costs related to the implementation of various intervention measures to control campylobacters in the chicken meat chain. Costs were estimated using a second-order stochastic simulation model. Treating only positively tested flocks is far cheaper than treating all flocks. The implementation of equipment to reduce faecal lea...

  4. A Semantics-Based Approach to Construction Cost Estimating

    Science.gov (United States)

    Niknam, Mehrdad

    2015-01-01

    A construction project requires collaboration of different organizations such as owner, designer, contractor, and resource suppliers. These organizations need to exchange information to improve their teamwork. Understanding the information created in other organizations requires specialized human resources. Construction cost estimating is one of…

  5. Estimating Resource Costs of Levy Campaigns in Five Ohio School Districts

    Science.gov (United States)

    Ingle, W. Kyle; Petroff, Ruth Ann; Johnson, Paul A.

    2011-01-01

    Using Levin and McEwan's (2001) "ingredients method," this study identified the major activities and associated costs of school levy campaigns in five districts. The ingredients were divided into one of five cost categories--human resources, facilities, fees, marketing, and supplies. As to overall costs of the campaigns, estimates ranged…

  6. Reducing Operating Costs by Optimizing Space in Facilities

    Science.gov (United States)

    2012-03-01

    Design: Mapping the High Performance Workscape. Jossey-Bass. San Francisco. Berkman, Elliot. (2012). A Conceptual Guide to Statistics using SPSS. Sage ...Cleaning: Includes labor costs for in-house and contract service, payroll , taxes and fringe benefits, plus salaried supervisors and managers, as well as...Labor costs include payroll , taxes and fringe benefits for employees and contracted workers. Personnel include operating engineers, general

  7. 25 CFR 39.101 - Does ISEF assess the actual cost of school operations?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Does ISEF assess the actual cost of school operations? 39... SCHOOL EQUALIZATION PROGRAM Indian School Equalization Formula § 39.101 Does ISEF assess the actual cost of school operations? No. ISEF does not attempt to assess the actual cost of school operations either...

  8. Development of a Cost Estimation Process for Human Systems Integration Practitioners During the Analysis of Alternatives

    Science.gov (United States)

    2010-12-01

    processes. Novice estimators must often use of these complicated cost estimation tools (e.g., ACEIT , SEER-H, SEER-S, PRICE-H, PRICE-S, etc.) until...However, the thesis will leverage the processes embedded in cost estimation tools such as the Automated Cost Estimating Integration Tool ( ACEIT ) and the

  9. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  10. 25 CFR 39.201 - Does ISEF reflect the actual cost of school operations?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Does ISEF reflect the actual cost of school operations... Does ISEF reflect the actual cost of school operations? ISEF does not attempt to assess the actual cost of school operations either at the local school level or in the aggregate nationally. ISEF is a...

  11. PFP total operating efficiency calculation and basis of estimate

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The purpose of the Plutonium Finishing Plant (PFP) Total Operating Efficiency Calculation and Basis of Estimate document is to provide the calculated value and basis of estimate for the Total Operating Efficiency (TOE) for the material stabilization operations to be conducted in 234-52 Building. This information will be used to support both the planning and execution of the Plutonium Finishing Plant (PFP) Stabilization and Deactivation Project's (hereafter called the Project) resource-loaded, integrated schedule

  12. Cost Analysis of Operation Theatre Services at an Apex Tertiary Care Trauma Centre of India.

    Science.gov (United States)

    Siddharth, Vijaydeep; Kumar, Subodh; Vij, Aarti; Gupta, Shakti Kumar

    2015-12-01

    Operating room services are one of the major cost and revenue-generating centres of a hospital. The cost associated with the provisioning of operating department services depends on the resources consumed and the unit costs of those resources. The objective of this study was to calculate the cost of operation theatre services at Jai Prakash Narayan Apex Trauma Centre, AIIMS, New Delhi. The study was carried out at the operation theatre department of Jai Prakash Narayan Apex Trauma Centre (JPNATC), AIIMS from April 2010 to March 2011 after obtaining approval from concerned authorities. This study was observational and descriptive in nature. Traditional (average or gross) costing methodology was used to arrive at the cost for the provisioning of operation theatre (OT) services. Cost was calculated under two heads; as capital and operating cost. Annualised cost of capital assets was calculated according to the methodology prescribed by the World Health Organization and operating costs were taken on actual basis; thereafter, per day cost of OT services was obtained. The average number of surgeries performed in the trauma centre per day is 13. The annual cost of providing operating room services at JPNATC, New Delhi was calculated to be 197,298,704 Indian rupees (INR) (US$ 3,653,679), while the per hour cost was calculated to be INR 22,626.92 (US$ 419). Majority of the expenditures were for human resource (33.63 %) followed by OT capital cost (31.90 %), consumables (29.97 %), engineering maintenance cost (2.55 %), support services operating cost (1.22 %) and support services capital cost (0.73 %). Of the total cost towards the provisioning of OT services, 32.63 % was capital cost while 67.37 % is operating cost. The results of this costing study will help in the future planning of resource allocation within the financial constraints (US$ 1 = INR 54).

  13. Federal Regulations: Efforts to Estimate Total Costs and Benefits of Rules

    Science.gov (United States)

    2004-04-07

    the Chamber of Commerce , academicians, the media, and others, and is sometimes cited with a high degree of certainty ." For example, some articles...House of Representatives, Feb . 25,2004; and testimony of William P . Kovacs, Vice President, U .S. Chamber of Commerce , before the Subcommittee on Energy...estimated the annual cost to employers of the Family and Medical Leave Act at $825 million, but that the Chamber of Commerce estimated the cost at between $3

  14. Estimate of the cost of multiple sclerosis in Spain by literature review.

    Science.gov (United States)

    Fernández, Oscar; Calleja-Hernández, Miguel Angel; Meca-Lallana, José; Oreja-Guevara, Celia; Polanco, Ana; Pérez-Alcántara, Ferran

    2017-08-01

    Multiple Sclerosis (MS) is a progressive disease leading to increasing disability and costs. A literature review was carried out to identify MS costs and to estimate its economic burden in Spain. Areas Covered: The public electronic databases PubMed, ScienceDirect and IBECS were consulted and a manual review of communications presented at related congresses was carried out. A total of 225 references were obtained, of which 43 were finally included in the study. Expert Commentary: Three major cost groups were identified: direct healthcare costs, direct non-healthcare costs and indirect costs. There is a direct relationship between disease progression and increased costs, mainly direct non-healthcare costs (greater need for informal care) and indirect costs (greater loss of productivity). The total cost associated with MS in Spain is €1,395 million per year, and that the mean annual cost per patient is €30,050. Beyond costs, a large impact on the quality of life of patients, with an annual loss of up to 13,000 quality-adjusted life years was also estimated. MS has a large economic impact on Spanish society and a significant impact on the quality of life of patients.

  15. A study on the estimation method of nuclear accident risk cost

    International Nuclear Information System (INIS)

    Matsuo, Yuji

    2016-01-01

    The methodology of estimating nuclear accident risk cost, as a part of nuclear power generation cost, has hardly been established due mainly to the extremely wide range of the estimation of the accident frequency. This study estimates the expected nuclear accident frequency for Japan, making use of the method of Bayesian statistics, which exploits both the information obtained by Probabilistic Risk Assessment (PRA) and the observed historical accident frequencies. Using the PRA estimation of the Containment Failure Frequency (CFF) for Tomari nuclear power plant unit 3 of Hokkaido Electric Power Company (average: 2.1 x 10 -4 , 95th percentile: 7.7 x 10 -4 ) and the actual large-scale accident frequency (once in 1,460 reactor-years), the posterior CFF was estimated at 3.8 x 10 -4 . This study also took into account the 'external' factor causing unexpected nuclear accidents, concluding that such factor could result in higher CFF estimations, especially with larger observed accident numbers. (author)

  16. Estimated Cost to a Restaurant of a Foodborne Illness Outbreak.

    Science.gov (United States)

    Bartsch, Sarah M; Asti, Lindsey; Nyathi, Sindiso; Spiker, Marie L; Lee, Bruce Y

    Although outbreaks of restaurant-associated foodborne illness occur periodically and make the news, a restaurant may not be aware of the cost of an outbreak. We estimated this cost under varying circumstances. We developed a computational simulation model; scenarios varied outbreak size (5 to 250 people affected), pathogen (n = 15), type of dining establishment (fast food, fast casual, casual dining, and fine dining), lost revenue (ie, meals lost per illness), cost of lawsuits and legal fees, fines, and insurance premium increases. We estimated that the cost of a single foodborne illness outbreak ranged from $3968 to $1.9 million for a fast-food restaurant, $6330 to $2.1 million for a fast-casual restaurant, $8030 to $2.2 million for a casual-dining restaurant, and $8273 to $2.6 million for a fine-dining restaurant, varying from a 5-person outbreak, with no lost revenue, lawsuits, legal fees, or fines, to a 250-person outbreak, with high lost revenue (100 meals lost per illness), and a high amount of lawsuits and legal fees ($1 656 569) and fines ($100 000). This cost amounts to 10% to 5790% of a restaurant's annual marketing costs and 0.3% to 101% of annual profits and revenue. The biggest cost drivers were lawsuits and legal fees, outbreak size, and lost revenue. Pathogen type affected the cost by a maximum of $337 000, the difference between a Bacillus cereus outbreak (least costly) and a listeria outbreak (most costly). The cost of a single foodborne illness outbreak to a restaurant can be substantial and outweigh the typical costs of prevention and control measures. Our study can help decision makers determine investment and motivate research for infection-control measures in restaurant settings.

  17. Total cost estimates for large-scale wind scenarios in UK

    International Nuclear Information System (INIS)

    Dale, Lewis; Milborrow, David; Slark, Richard; Strbac, Goran

    2004-01-01

    The recent UK Energy White Paper suggested that the Government should aim to secure 20% of electricity from renewable sources by 2020. A number of estimates of the extra cost of such a commitment have been made, but these have not necessarily included all the relevant cost components. This analysis sets out to identify these and to calculate the extra cost to the electricity consumer, assuming all the renewable electricity is sourced from wind energy. This enables one of the more controversial issues--the implications of wind intermittency--to be addressed. The basis of the assumptions associated with generating costs, extra balancing costs and distribution and transmission system reinforcement costs are all clearly identified and the total costs of a '20% wind' scenario are compared with a scenario where a similar amount of energy is generated by gas-fired plant. This enables the extra costs of the renewables scenario to be determined. The central estimate of the extra costs to electricity consumers is just over 0.3 p/kW h in current prices (around 5% extra on average domestic unit prices). Sensitivity analyses examine the implications of differing assumptions. The extra cost would rise if the capital costs of wind generation fall slower than anticipated, but would fall if gas prices rise more rapidly than has been assumed, or if wind plant are more productive. Even if it is assumed that wind has no capacity displacement value, the added cost to the electricity consumer rises by less than 0.1 p/kW h. It is concluded that there does not appear to be any technical reason why a substantial proportion of the country's electricity requirements could not be delivered by wind

  18. (Reportıng of Operation Results In Basis Of Actual Variable Cost)

    OpenAIRE

    Çıkrıkçı, Mustafa; Dabbağoğlu, Kadir

    2007-01-01

    Calculation of production cost is primarily, essential to calculate cost of sales. Production cost is in the field of cost accounting and there are different approaches on calculation of production cost in cost accounting theory. These approaches designate the cost system. A cost system is a combination of cost principle, cost method and cost procedure. Principals consist of full cost and partial cost. Methods consist of actual cost and estimated cost. Procedures consist of order cost and sta...

  19. The costs and quality of operative training for residents in tympanoplasty type I.

    Science.gov (United States)

    Wang, Mao-Che; Yu, Eric Chen-Hua; Shiao, An-Suey; Liao, Wen-Huei; Liu, Chia-Yu

    2009-05-01

    A teaching hospital would incur more operation room costs on training surgical residents. To evaluate the increased operation time and the increased operation room costs of operations performed by surgical residents. As a model we used a very common surgical otology procedure -- tympanoplasty type I. From January 1, 2004 to December 31, 2004, we included in this study 100 patients who received tympanoplasty type I in Taipei Veterans General Hospital. Fifty-six procedures were performed by a single board-certified surgeon and 44 procedures were performed by residents. We analyzed the operation time and surgical outcomes in these two groups of patients. The operation room cost per minute was obtained by dividing the total operation room expenses by total operation time in the year 2004. The average operation time of residents was 116.47 min, which was significantly longer (pcost USD $40.36 more for each operation performed by residents in terms of operation room costs. The surgical success rate of residents was 81.82%, which was significantly lower (p=0.016) than that of the board-certified surgeon (96.43%).

  20. The cost of crime to society: new crime-specific estimates for policy and program evaluation.

    Science.gov (United States)

    McCollister, Kathryn E; French, Michael T; Fang, Hai

    2010-04-01

    Estimating the cost to society of individual crimes is essential to the economic evaluation of many social programs, such as substance abuse treatment and community policing. A review of the crime-costing literature reveals multiple sources, including published articles and government reports, which collectively represent the alternative approaches for estimating the economic losses associated with criminal activity. Many of these sources are based upon data that are more than 10 years old, indicating a need for updated figures. This study presents a comprehensive methodology for calculating the cost to society of various criminal acts. Tangible and intangible losses are estimated using the most current data available. The selected approach, which incorporates both the cost-of-illness and the jury compensation methods, yields cost estimates for more than a dozen major crime categories, including several categories not found in previous studies. Updated crime cost estimates can help government agencies and other organizations execute more prudent policy evaluations, particularly benefit-cost analyses of substance abuse treatment or other interventions that reduce crime. Copyright 2010 Elsevier Ireland Ltd. All rights reserved.

  1. Hospital costs estimation and prediction as a function of patient and admission characteristics.

    Science.gov (United States)

    Ramiarina, Robert; Almeida, Renan Mvr; Pereira, Wagner Ca

    2008-01-01

    The present work analyzed the association between hospital costs and patient admission characteristics in a general public hospital in the city of Rio de Janeiro, Brazil. The unit costs method was used to estimate inpatient day costs associated to specific hospital clinics. With this aim, three "cost centers" were defined in order to group direct and indirect expenses pertaining to the clinics. After the costs were estimated, a standard linear regression model was developed for correlating cost units and their putative predictors (the patients gender and age, the admission type (urgency/elective), ICU admission (yes/no), blood transfusion (yes/no), the admission outcome (death/no death), the complexity of the medical procedures performed, and a risk-adjustment index). Data were collected for 3100 patients, January 2001-January 2003. Average inpatient costs across clinics ranged from (US$) 1135 [Orthopedics] to 3101 [Cardiology]. Costs increased according to increases in the risk-adjustment index in all clinics, and the index was statistically significant in all clinics except Urology, General surgery, and Clinical medicine. The occupation rate was inversely correlated to costs, and age had no association with costs. The (adjusted) per cent of explained variance varied between 36.3% [Clinical medicine] and 55.1% [Thoracic surgery clinic]. The estimates are an important step towards the standardization of hospital costs calculation, especially for countries that lack formal hospital accounting systems.

  2. Estimating the costs of school closure for mitigating an influenza pandemic

    Directory of Open Access Journals (Sweden)

    Adams Elisabeth J

    2008-04-01

    Full Text Available Abstract Background School closure is a key component of many countries' plans to mitigate the effect of an influenza pandemic. Although a number of studies have suggested that such a policy might reduce the incidence, there are no published studies of the cost of such policies. This study attempts to fill this knowledge gap Methods School closure is expected to lead to significant work absenteeism of working parents who are likely to be the main care givers to their dependent children at home. The cost of absenteeism due to school closure is calculated as the paid productivity loss of parental absenteeism during the period of school closure. The cost is estimated from societal perspective using a nationally representative survey. Results The results show that overall about 16% of the workforce is likely to be the main caregiver for dependent children and therefore likely to take absenteeism. This rises to 30% in the health and social care sector, as a large proportion of the workforce are women. The estimated costs of school closure are significant, at £0.2 bn – £1.2 bn per week. School closure is likely to significantly exacerbate the pressures on the health system through staff absenteeism. Conclusion The estimates of school closure associated absenteeism and the projected cost would be useful for pandemic planning for business continuity, and for cost effectiveness evaluation of different pandemic influenza mitigation strategies.

  3. Cost estimation model for advanced planetary programs, fourth edition

    Science.gov (United States)

    Spadoni, D. J.

    1983-01-01

    The development of the planetary program cost model is discussed. The Model was updated to incorporate cost data from the most recent US planetary flight projects and extensively revised to more accurately capture the information in the historical cost data base. This data base is comprised of the historical cost data for 13 unmanned lunar and planetary flight programs. The revision was made with a two fold objective: to increase the flexibility of the model in its ability to deal with the broad scope of scenarios under consideration for future missions, and to maintain and possibly improve upon the confidence in the model's capabilities with an expected accuracy of 20%. The Model development included a labor/cost proxy analysis, selection of the functional forms of the estimating relationships, and test statistics. An analysis of the Model is discussed and two sample applications of the cost model are presented.

  4. Estimated incident cost savings in shipping due to inspections.

    Science.gov (United States)

    Knapp, Sabine; Bijwaard, Govert; Heij, Christiaan

    2011-07-01

    The effectiveness of safety inspections of ships has been analysed from various angles, but until now, relatively little attention has been given to translate risk reduction into incident cost savings. This paper provides a monetary quantification of the cost savings that can be attributed to port state control inspections and industry vetting inspections. The dataset consists of more than half a million ship arrivals between 2002 and 2007 and contains inspections of port state authorities in the USA and Australia and of three industry vetting regimes. The effect of inspections in reducing the risk of total loss accidents is estimated by means of duration models, in terms of the gained probability of survival. The monetary benefit of port state control inspections is estimated to range, on average, from about 70 to 190 thousand dollars, with median values ranging from about 20 to 45 thousand dollars. Industry inspections have even higher benefits, especially for tankers. The savings are in general higher for older and larger vessels, and also for vessels with undefined flag and unknown classification society. As inspection costs are relatively low in comparison to potential cost savings, the results underline the importance of determining ships with relatively high risk of total loss. Copyright © 2011 Elsevier Ltd. All rights reserved.

  5. Comparison of methods for estimating the cost of human immunodeficiency virus-testing interventions.

    Science.gov (United States)

    Shrestha, Ram K; Sansom, Stephanie L; Farnham, Paul G

    2012-01-01

    The Centers for Disease Control and Prevention (CDC), Division of HIV/AIDS Prevention, spends approximately 50% of its $325 million annual human immunodeficiency virus (HIV) prevention funds for HIV-testing services. An accurate estimate of the costs of HIV testing in various settings is essential for efficient allocation of HIV prevention resources. To assess the costs of HIV-testing interventions using different costing methods. We used the microcosting-direct measurement method to assess the costs of HIV-testing interventions in nonclinical settings, and we compared these results with those from 3 other costing methods: microcosting-staff allocation, where the labor cost was derived from the proportion of each staff person's time allocated to HIV testing interventions; gross costing, where the New York State Medicaid payment for HIV testing was used to estimate program costs, and program budget, where the program cost was assumed to be the total funding provided by Centers for Disease Control and Prevention. Total program cost, cost per person tested, and cost per person notified of new HIV diagnosis. The median costs per person notified of a new HIV diagnosis were $12 475, $15 018, $2697, and $20 144 based on microcosting-direct measurement, microcosting-staff allocation, gross costing, and program budget methods, respectively. Compared with the microcosting-direct measurement method, the cost was 78% lower with gross costing, and 20% and 61% higher using the microcosting-staff allocation and program budget methods, respectively. Our analysis showed that HIV-testing program cost estimates vary widely by costing methods. However, the choice of a particular costing method may depend on the research question being addressed. Although program budget and gross-costing methods may be attractive because of their simplicity, only the microcosting-direct measurement method can identify important determinants of the program costs and provide guidance to improve

  6. Cost estimates to guide manufacturing of composite waved beam

    International Nuclear Information System (INIS)

    Ye Jinrui; Zhang Boming; Qi Haiming

    2009-01-01

    A cost estimation model on the basis of manufacturing process has been presented. In the model, the effects of the material, labor, tool and equipment were discussed, and the corresponding formulas were provided. A method of selecting estimation variables has been provided based on a case study of composite waved beam using autoclave cure. The model parameters related to the process time estimation of the lay-up procedure were analyzed and modified for different part configurations. The result shows that there is little error while comparing the estimated process time with the practical one. The model is verified to be applicable to guide the design and manufacturing of the composite material

  7. Qualitative and quantitative cost estimation : a methodology analysis

    NARCIS (Netherlands)

    Aram, S.; Eastman, C.; Beetz, J.; Issa, R.; Flood, I.

    2014-01-01

    This paper reports on the first part of ongoing research with the goal of designing a framework and a knowledge-based system for 3D parametric model-based quantity take-off and cost estimation in the Architecture, Engineering and Construction (AEC) industry. The authors have studied and analyzed

  8. A life cycle cost economics model for automation projects with uniformly varying operating costs. [applied to Deep Space Network and Air Force Systems Command

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    The described mathematical model calculates life-cycle costs for projects with operating costs increasing or decreasing linearly with time. The cost factors involved in the life-cycle cost are considered, and the errors resulting from the assumption of constant rather than uniformly varying operating costs are examined. Parameters in the study range from 2 to 30 years, for project life; 0 to 15% per year, for interest rate; and 5 to 90% of the initial operating cost, for the operating cost gradient. A numerical example is presented.

  9. Cost Implications of Uncertainty in CO{sub 2} Storage Resource Estimates: A Review

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Steven T., E-mail: sanderson@usgs.gov [National Center, U.S. Geological Survey (United States)

    2017-04-15

    Carbon capture from stationary sources and geologic storage of carbon dioxide (CO{sub 2}) is an important option to include in strategies to mitigate greenhouse gas emissions. However, the potential costs of commercial-scale CO{sub 2} storage are not well constrained, stemming from the inherent uncertainty in storage resource estimates coupled with a lack of detailed estimates of the infrastructure needed to access those resources. Storage resource estimates are highly dependent on storage efficiency values or storage coefficients, which are calculated based on ranges of uncertain geological and physical reservoir parameters. If dynamic factors (such as variability in storage efficiencies, pressure interference, and acceptable injection rates over time), reservoir pressure limitations, boundaries on migration of CO{sub 2}, consideration of closed or semi-closed saline reservoir systems, and other possible constraints on the technically accessible CO{sub 2} storage resource (TASR) are accounted for, it is likely that only a fraction of the TASR could be available without incurring significant additional costs. Although storage resource estimates typically assume that any issues with pressure buildup due to CO{sub 2} injection will be mitigated by reservoir pressure management, estimates of the costs of CO{sub 2} storage generally do not include the costs of active pressure management. Production of saline waters (brines) could be essential to increasing the dynamic storage capacity of most reservoirs, but including the costs of this critical method of reservoir pressure management could increase current estimates of the costs of CO{sub 2} storage by two times, or more. Even without considering the implications for reservoir pressure management, geologic uncertainty can significantly impact CO{sub 2} storage capacities and costs, and contribute to uncertainty in carbon capture and storage (CCS) systems. Given the current state of available information and the

  10. Regional Cost Estimates for Reclamation Practices on Arid and Semiarid Lands; TOPICAL

    International Nuclear Information System (INIS)

    W. K. Ostler

    2002-01-01

    The U.S. Army uses the Integrated Training Area Management program for managing training land. One of the major objectives of the Integrated Training Area Management program has been to develop a method for estimating training land carrying capacity in a sustainable manner. The Army Training and Testing Area Carrying Capacity methodology measures training load in terms of Maneuver Impact Miles. One Maneuver Impact Mile is the equivalent impact of an M1A2 tank traveling one mile while participating in an armor battalion field training exercise. The Army Training and Testing Area Carrying Capacity methodology is also designed to predict land maintenance costs in terms of dollars per Maneuver Impact Mile. The overall cost factor is calculated using the historical cost of land maintenance practices and the effectiveness of controlling erosion. Because land maintenance costs and effectiveness are influenced by the characteristics of the land, Army Training and Testing Area Carrying Capacity cost factors must be developed for each ecological region of the country. Costs for land maintenance activities are presented here for the semiarid and arid regions of the United States. Five ecoregions are recognized, and average values for reclamation activities are presented. Because there are many variables that can influence costs, ranges for reclamation activities are also presented. Costs are broken down into six major categories: seedbed preparation, fertilization, seeding, planting, mulching, and supplemental erosion control. Costs for most land reclamation practices and materials varied widely within and between ecological provinces. Although regional cost patterns were evident for some practices, the patterns were not consistent between practices. For the purpose of estimating land reclamation costs for the Army Training and Testing Area Carrying Capacity methodology, it may be desirable to use the ''Combined Average'' of all provinces found in the last row of each table

  11. Estimating the Cost of Care for Emergency Department Syncope Patients: Comparison of Three Models

    Directory of Open Access Journals (Sweden)

    Marc A. Probst

    2017-02-01

    Full Text Available Introduction: We sought to compare three hospital cost-estimation models for patients undergoing evaluation for unexplained syncope using hospital cost data. Developing such a model would allow researchers to assess the value of novel clinical algorithms for syncope management. Methods: We collected complete health services data, including disposition, testing, and length of stay (LOS, on 67 adult patients (age 60 years and older who presented to the emergency department (ED with syncope at a single hospital. Patients were excluded if a serious medical condition was identified. We created three hospital cost-estimation models to estimate facility costs: V1, unadjusted Medicare payments for observation and/or hospital admission; V2: modified Medicare payment, prorated by LOS in calendar days; and V3: modified Medicare payment, prorated by LOS in hours. Total hospital costs included unadjusted Medicare payments for diagnostic testing and estimated facility costs. We plotted these estimates against actual cost data from the hospital finance department, and performed correlation and regression analyses. Results: Of the three models, V3 consistently outperformed the others with regard to correlation and goodness of fit. The Pearson correlation coefficient for V3 was 0.88 (95% confidence interval [CI] 0.81, 0.92 with an R-square value of 0.77 and a linear regression coefficient of 0.87 (95% CI 0.76, 0.99. Conclusion: Using basic health services data, it is possible to accurately estimate hospital costs for older adults undergoing a hospital-based evaluation for unexplained syncope. This methodology could help assess the potential economic impact of implementing novel clinical algorithms for ED syncope. [West J Emerg Med. 2017;18(2253-257.

  12. An Optimal Operating Strategy for Battery Life Cycle Costs in Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Yinghua Han

    2014-01-01

    Full Text Available Impact on petroleum based vehicles on the environment, cost, and availability of fuel has led to an increased interest in electric vehicle as a means of transportation. Battery is a major component in an electric vehicle. Economic viability of these vehicles depends on the availability of cost-effective batteries. This paper presents a generalized formulation for determining the optimal operating strategy and cost optimization for battery. Assume that the deterioration of the battery is stochastic. Under the assumptions, the proposed operating strategy for battery is formulated as a nonlinear optimization problem considering reliability and failure number. And an explicit expression of the average cost rate is derived for battery lifetime. Results show that the proposed operating strategy enhances the availability and reliability at a low cost.

  13. Operating dedicated data centers – is it cost-effective?

    International Nuclear Information System (INIS)

    Ernst, M; Hogue, R; Hollowell, C; Strecker-Kellog, W; Wong, A; Zaytsev, A

    2014-01-01

    The advent of cloud computing centres such as Amazon's EC2 and Google's Computing Engine has elicited comparisons with dedicated computing clusters. Discussions on appropriate usage of cloud resources (both academic and commercial) and costs have ensued. This presentation discusses a detailed analysis of the costs of operating and maintaining the RACF (RHIC and ATLAS Computing Facility) compute cluster at Brookhaven National Lab and compares them with the cost of cloud computing resources under various usage scenarios. An extrapolation of likely future cost effectiveness of dedicated computing resources is also presented.

  14. Early cost estimating for road construction projects using multiple regression techniques

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  15. Labor productivity adjustment factors. A method for estimating labor construction costs associated with physical modifications to nuclear power plants

    International Nuclear Information System (INIS)

    Riordan, B.J.

    1986-03-01

    This report develops quantitative labor productivity adjustment factors for the performance of regulatory impact analyses (RIAs). These factors will allow analysts to modify ''new construction'' labor costs to account for changes in labor productivity due to differing work environments at operating reactors and at reactors with construction in progress. The technique developed in this paper relies on the Energy Economic Data Base (EEDB) for baseline estimates of the direct labor hours and/or labor costs required to perform specific tasks in a new construction environment. The labor productivity cost factors adjust for constraining conditions such as working in a radiation environment, poor access, congestion and interference, etc., which typically occur on construction tasks at operating reactors and can occur under certain circumstances at reactors under construction. While the results do not portray all aspects of labor productivity, they encompass the major work place conditions generally discernible by the NRC analysts and assign values that appear to be reasonable within the context of industry experience. 18 refs

  16. Early‐Stage Capital Cost Estimation of Biorefinery Processes: A Comparative Study of Heuristic Techniques

    Science.gov (United States)

    Couturier, Jean‐Luc; Kokossis, Antonis; Dubois, Jean‐Luc

    2016-01-01

    Abstract Biorefineries offer a promising alternative to fossil‐based processing industries and have undergone rapid development in recent years. Limited financial resources and stringent company budgets necessitate quick capital estimation of pioneering biorefinery projects at the early stages of their conception to screen process alternatives, decide on project viability, and allocate resources to the most promising cases. Biorefineries are capital‐intensive projects that involve state‐of‐the‐art technologies for which there is no prior experience or sufficient historical data. This work reviews existing rapid cost estimation practices, which can be used by researchers with no previous cost estimating experience. It also comprises a comparative study of six cost methods on three well‐documented biorefinery processes to evaluate their accuracy and precision. The results illustrate discrepancies among the methods because their extrapolation on biorefinery data often violates inherent assumptions. This study recommends the most appropriate rapid cost methods and urges the development of an improved early‐stage capital cost estimation tool suitable for biorefinery processes. PMID:27484398

  17. Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

    Science.gov (United States)

    Comstock, Douglas A.; Van Wychen, Kristin; Zimmerman, Mary Beth

    2015-01-01

    Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

  18. Avoided operating costs in thermal generating systems

    International Nuclear Information System (INIS)

    Chowdhury, N.; Billinton, R.; Gupta, R.

    1995-01-01

    A simple and straightforward technique was developed to assess avoided system operating costs associated with non-utility generation (NUG). The technique was based on optimum loading configurations of the committed units both before and after the inclusion of NUG energy. The salient features of the technique were presented in this paper. Assessment of avoided operating cost with deterministic and probabilistic criteria were explained. A time differentiated price system was adopted in the algorithms to reflect the different value placed on purchased price by a utility at different times of the day. The algorithms show the utility effects of dispatchable and non-dispatchable NUG energies. The IEEE Reliability Test System (RTS) was utilized for numerical analysis. Results were illustrated. It was found that sensitivity studies similar to those performed on the IEEE-RTS could be utilized to determine the amount of energy and the time period during which utilities and NUGs can maximize their economic benefits. 7 refs., 5 figs., 1 tab

  19. Cost and price estimate of Brayton and Stirling engines in selected production volumes

    Science.gov (United States)

    Fortgang, H. R.; Mayers, H. F.

    1980-01-01

    The methods used to determine the production costs and required selling price of Brayton and Stirling engines modified for use in solar power conversion units are presented. Each engine part, component and assembly was examined and evaluated to determine the costs of its material and the method of manufacture based on specific annual production volumes. Cost estimates are presented for both the Stirling and Brayton engines in annual production volumes of 1,000, 25,000, 100,000 and 400,000. At annual production volumes above 50,000 units, the costs of both engines are similar, although the Stirling engine costs are somewhat lower. It is concluded that modifications to both the Brayton and Stirling engine designs could reduce the estimated costs.

  20. The System Cost Model: A tool for life cycle cost and risk analysis

    International Nuclear Information System (INIS)

    Hsu, K.; Lundeen, A.; Shropshire, D.; Sherick, M.

    1996-01-01

    In May of 1994, Lockheed Idaho Technologies Company (LITCO) in Idaho Falls, Idaho and subcontractors began development of the System Cost Model (SCM) application. The SCM estimates life cycle costs of the entire US Department of Energy (DOE) complex for designing; constructing; operating; and decommissioning treatment, storage, and disposal (TSD) facilities for mixed low-level, low-level, and transuranic waste. The SCM uses parametric cost functions to estimate life cycle costs for various treatment, storage, and disposal modules which reflect planned and existing waste management facilities at DOE installations. In addition, SCM can model new TSD facilities based on capacity needs over the program life cycle. The user can provide input data (default data is included in the SCM) including the volume and nature of waste to be managed, the time period over which the waste is to be managed, and the configuration of the waste management complex (i.e., where each installation's generated waste will be treated, stored, and disposed). Then the SCM uses parametric cost equations to estimate the costs of pre-operations (designing), construction, operations and maintenance, and decommissioning these waste management facilities. The SCM also provides transportation costs for DOE wastes. Transportation costs are provided for truck and rail and include transport of contact-handled, remote-handled, and alpha (transuranic) wastes. A complement to the SCM is the System Cost Model-Risk (SCM-R) model, which provides relative Environmental, Safety, and Health (ES and H) risk information. A relative ES and H risk basis has been developed and applied by LITCO at the INEL. The risk basis is now being automated in the SCM-R to facilitate rapid risk analysis of system alternatives. The added risk functionality will allow combined cost and risk evaluation of EM alternatives