  1. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  2. Field Sampling Plan for the Operable Units 6-05 and 10-04 Remedial Action, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. Wells

    2006-11-14

    This Field Sampling Plan outlines the collection and analysis of samples in support of Phase IV of the Waste Area Group 10, Operable Units 6-05 and 10-04 remedial action. Phase IV addresses the remedial actions to areas with the potential for unexploded ordnance at the Idaho National Laboratory Site. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. The remedial action consists of removal and disposal of ordnance by high-order detonation, followed by sampling to determine the extent, if any, of soil that might have been contaminated by the detonation activities associated with the disposal of ordnance during the Phase IV activities and explosives during the Phase II activities.

  3. Commercial operation and outage experience of ABWR at Kashiwazaki-Kariwa units Nos. 6 and 7

    International Nuclear Information System (INIS)

    Anahara, N.; Yamada, M.; Kataoka, H.

    2000-01-01

    Kashiwazaki-Kariwa Nuclear Power Station Units Nos. 6 and 7, the world's first ABWRs (Advanced Boiling Water Reactor), started commercial operation on November 7, 1996 and July 2, 1997, respectively, and continued their commercial operation with a high capacity factor, low occupational radiation exposure and radioactive waste. Units 6 and 7 were in their 3rd cycle operation until 25th April 1999 and 1st November 1999, respectively. Thermal efficiency was 35.4-35.8% (design thermal efficiency: 34.5%) during these period, demonstrating better performance than that of BWR-5 (design thermal efficiency: 33.4%). Nos. 6 and 7 have experienced 2 annual outages. The first outage of unit No. 6 started on November 20, 1997 and was completed within 61 days (including 6 New Year holidays), and the second outage started on March 13, 1999 and was completed within 44 days. The first annual outage of unit No. 7 started on May 27, 1998, earlier than it would normally have been, to avoid an annual outage during the summer, and was completed within 55 days, and the second outage started on September 18th, 1999 and was completed within 45 days, All annual outages were carried out within a very short time period without any severe malfunctions, including newly designed ABWR systems and equipment. As the first outage in Japan, 55 days is a very short period, despite the fact that the Nos. 6 and 7 are the first ABWRs in the world and the largest capacity units in Japan. The total occupational radiation exposure of No. 6 was 300 man-mSv (1st outage) and 331 man-mSv (2nd outage). That of Unit 7 was 153 man-mSv (1st outage) Those of unit No. 6 were at the same level as those of unit No. 3, which is the latest design 1100MW(e) BWR-5. That of unit No. 7 was the lowest ever at Kashiwazaki-Kariwa nuclear power station. The drums of radioactive waste discharged during the annual outage numbered 54 (1st outage) for No. 6 and 62 (1st outage) for No. 7, which was less than the design target of 100

  4. Operational benchmark for VVER-1000, unit 6, Kozloduy NPP

    International Nuclear Information System (INIS)

    Apostolov, T.; Petrov, B.

    1999-01-01

    Benchmark calculations have been carried out using the 3D nodal code TRAPEZ. Global neutron-physics characteristics of the VVER-1000 core, Kozloduy NPP Unit 6, have been determined taking into account the real loading patterns and operational history of the first three cycles. The code TRLOAD has been used to perform the fuel reloading between any two cycles. The reactor and components descriptions as well as material compositions are given. The results presented include the critical boric acid concentration, the radial power distribution, the axial power distribution for the maximum overload assembly, and the burnup distribution at three different moments during each cycle. Calculated values have been compared with measured data. It is shown that the results obtained by the TRAPEZ code are in good agreement with the experimental data. The information presented could serve as a test case for validation of code packages designed for analyzing the steady-state operation of VVERs. (author)

  5. Remedial Action Report for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2007-08-15

    This Phase III remedial action report addresses the remediation of lead-contaminated soils found at the Security Training Facility STF-02 Gun Range at the Idaho National Laboratory Site. Phase I, consisting of developing and implementing institutional controls at Operble Unit 10-04 sites and developing and implementing Idaho National Laboratory Site-wide plans for both institutional controls and ecological monitoring, was addressed in a previous report. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase IV will remediate hazards from unexploded ordnance.

  6. Probabilistic determination of operating rules for 6.6 kV power supplies to 900 MW(e) pressurized-water units

    International Nuclear Information System (INIS)

    Blin, A.; Carnino, A.; Boursier, M.; Greppo, J.F.

    1975-01-01

    The 6.6 kV power supplies to the safety systems of the 900 MW PWR units being built by Electricite de France (EDF) are ensured by four redundant sources within or outside the site. Because of this redundancy, non-availability of one or more of the sources does not jeopardize the electricity supply - it merely means that the unit must be shut down deliberately for safety reasons at some time. The proposed method is a probabilistic approach which makes it possible to determine how long the unit can reasonably continue on power in such circumstances. The study described in the paper is based on operating results recorded by EDF for equipment similar to that envisaged for future nuclear power stations and in service in existing ones. The amount of information gathered and the method employed for gathering it permit a realistic assessment of the reliability parameters of the equipment (failure and repair rates). To allow for the fact that the equipment can be repaired, the method proper involves use of the Markov model, with which one can find, for each configuration of the system, the change over time of the probability P 0 of a simultaneous failure of all power sources. Use of this method requires prior conversion of the actual concept to an equivalent concept. The sensitivity of P 0 to the parameters is studied for each case, a reasonable uncertainty range being obtained for P 0 . Common mode failures for external or internal sources are introduced in parametric form so that the parameter value beyond which they can be neglected is determined. On the basis of the results of the study, the authors propose the adoption of a comparative criterion whereby any mode of operation in degraded conditions (one or more sources not available) is permitted provided that the corresponding value of P 0 is always lower than the maximum value attained by it in the reference situation (all sources available). Applying this criterion, one can determine with the help of graphs the

  7. Hot rolling effect on the characters of Zr-0.6Nb-0.5Fe-0.5Cr alloy

    International Nuclear Information System (INIS)

    Sungkono; Siti Aidah

    2015-01-01

    Characters of Zr-0.6Nb-0.5Fe-0.5Cr alloy after hot rolling have been studied. The objective of this research was to obtain of hot rolling effect on the characteristics of microstructures, hardness and phases formed in Zr-0.6Nb-0.5Fe-0.5Cr alloy. The hot rolling process of alloy carried out at temperature of 800 °C with retention time of 1.5 and 2 hours and a thickness reduction between 5 to 25 %. The results of this experiment showed that the Zr-0.6Nb-0.5Fe-0.5Cr alloy has Widmanstaetten structure with microstructure evolving into deformed columnar grains and deformed elongated grains with increasing thickness reduction. Besides, the longer the retention time at temperature of 800 °C is the larger are the grain structures and formation of α-Zr and Zr_3Fe phase. The hardness of Zr-0.6Nb-0.5Fe-0.5Cr alloy has same trends i.e the larger thickness reduction gives higher hardness. The Zr-0.6Nb-0.5Fe-0.5Cr alloy can under go hot rolling deformation at a thickness reduction of 25 % and the formation of α-Zr and Zr_3Fe can increased of hardness and strength of Zr-0.6 Nb-0.5 Fe-0.5 Cr alloy. (author)

  8. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on a site in Montgomery and Chester Counties, Pennsylvania. A license for the operation of Limerick Unit 1 was issued on October 26, 1984. The license, which was restricted to a five percent power level, contained conditions which required resolution prior to proceeding beyond the five percent power level. Supplement 4, issued in May 1985, addressed some of these issues. Supplement 4 also contained the comments made by the Advisory Committee on Reactor Safeguards in its report dated November 6, 1984, regarding full power operation of Limerick Unit 1. Supplement 5, issued in July 1985, and this Supplement 6 address further issues, principally the status of offsite emergency planning, that require resolution prior to proceeding beyond the five percent power level

  9. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-11-14

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

  10. Safety Evaluation Report related to the operation of Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414). Supplement No. 6

    International Nuclear Information System (INIS)

    1986-05-01

    This report supplements the Safety Evaluation Report (NUREG-0954) issued in February 1983 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, Saluda River Electric Cooperative, Inc., and Piedmont Municipal Power Agency, as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 miles) north of Rock Hill and adjacent to Lake Wylie. This supplement provides additional information supporting the license for operation above 5% power and power ascension to full-power operation for Unit 2

  11. Safety evaluation report related to the operation of Shoreham Nuclear Power Station, Unit No. 1 (Docket No. 50-322). Supplement No. 6

    International Nuclear Information System (INIS)

    1984-07-01

    Supplement 6 (SSER 6) to the Safety Evaluation Report on Long Island Lighting Company's application for a license to operate the Shoreham Nuclear Power Station, Unit 1, located in Suffolk County, New York, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement addresses several items that have been reviewed by the staff since the previous supplement was issued

  12. 200-UP-2 operable unit radiological surveys

    International Nuclear Information System (INIS)

    Wendling, M.A.

    1994-01-01

    This report summarizes and documents the results of the radiological surveys conducted from August 17 through December 16, 1993 over a partial area of the 200-UP-2 Operable Unit, 200-W Area, Hanford Site, Richland, Washington. In addition, this report explains the survey methodology of the Mobile Surface Contamination Monitor 11 (MSCM-II) and the Ultra Sonic Ranging And Data System (USRADS). The radiological survey of the 200-UP-2 Operable Unit was conducted by the Site Investigative Surveys/Environmental Restoration Health Physics Organization of the Westinghouse Hanford Company. The survey methodology for the majority of area was based on utilization of the MSCM-II or the USRADS for automated recording of the gross beta/gamma radiation levels at or near six (6) inches from the surface soil

  13. Safety Evaluation Report related to the operation of Grand Gulf Nuclear Station, Units 1 and 2 (Docket Nos. 50-416 and 50-417). Supplement 6

    International Nuclear Information System (INIS)

    1984-08-01

    Supplement 6 to the Safety Evaluation Report for Mississippi Power and Light Company et al. joint application for licenses to operate the Grand Gulf Nuclear Station, Units 1 and 2, located on the east bank of the Mississippi River near Port Gibson in Claiborne County, Mississippi, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the NRC staff's evaluation of open items from previous supplements and Technical Specification changes required before authorizing operation of Unit 1 above 5% of rated power

  14. Organization of Control Units with Operational Addressing

    OpenAIRE

    Alexander A. Barkalov; Roman M. Babakov; Larysa A. Titarenko

    2012-01-01

    The using of operational addressing unit as the block of control unit is proposed. The new structure model of Moore finite-state machine with reduced hardware amount is developed. The generalized structure of operational addressing unit is suggested. An example of synthesis process for Moore finite-state machine with operational addressing unit is given. The analytical researches of proposed structure of control unit are executed.

  15. Unique dielectric features of a ceramic-semiconductor nanocomposite MgNb2O6 + 0.25Zn0.5Cd0.5S

    Science.gov (United States)

    Pukazhselvan, D.; Selvaraj, Nivas Babu; Bdikin, Igor; Saravanan, R. Sakthi Sudar; Jakka, Suresh Kumar; Soares, M. J.; Fagg, Duncan Paul

    2017-12-01

    The present communication deals with the optical/dielectric characteristics of MgNb2O6 + 0.25Zn0.5Cd0.5S nanocomposite (10-30 nm) mixture. Zn0.5Cd0.5S (size ∼10 nm) was synthesized by microwave assisted solvo-thermal method. Monophase magnesium niobate (MN) nanoparticles (10-20 nm) were synthesized in a single step by mechanochemical treatment of MgO + Nb2O5 under dry N2 atmosphere. The nanocomposite, MgNb2O6 + 0.25Zn0.5Cd0.5S, was prepared by mechanical admixing of MgNb2O6 and Zn0.5Cd0.5S taken in 4:1 molar ratio. The photoluminescence study shows violet, yellow and orange-red emissions by the MgNb2O6 + 0.25Zn0.5Cd0.5S composite. The observed dielectric constant value (ε) for MgNb2O6 + 0.25Zn0.5Cd0.5S is only 4.7, which is ∼5 times smaller than the ε value of MgNb2O6 while a dielectric loss for the composite being closer to zero ensures promising commercial applications.

  16. Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Waste Management Plan

    International Nuclear Information System (INIS)

    G. L. Schwendiman

    2006-01-01

    This Waste Management Plan describes waste management and waste minimization activities for Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory. The waste management activities described in this plan support the selected response action presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. This plan identifies the waste streams that will be generated during implementation of the remedial action and presents plans for waste minimization, waste management strategies, and waste disposition

  17. Analysis of Fukushima unit 2 accident considering the operating conditions of RCIC system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Il, E-mail: sikim@kaeri.re.kr; Park, Jong Hwa; Ha, Kwang Soon; Cho, Song-Won; Song, JinHo

    2016-03-15

    Highlights: • Fukushima unit 2 accident was analyzed using MELCOR 1.8.6. • RCIC operating conditions were assumed and best case was selected. • Effect of RCIC operating condition on accident scenario was found. - Abstract: A severe accident in Fukushima occurred on March 11, 2011 and units 1, 2 and 3 were damaged severely. A tsunami following an earthquake made the supply of electricity power stop, and the safety systems, which use AC or DC power in plants could not operate properly. It is supposed that the degree of core degradation of unit 2 is less serious than in the other plants, and it was estimated that the operation of reactor core isolation cooling (RCIC) system at the initial stage of the accident minimized the core damage through decay heat removal. Although the operating conditions of the RCIC system are not known clearly, it can be important to analyze the accident scenario of unit 2. In this study, best case of the Fukushima unit 2 accident was presented considering the operating conditions of the RCIC system. The effects of operating condition on core degradation and fission product release rate to environment were also examined. In addition, importance of torus room flooding level in the accident analysis was discussed. MELCOR 1.8.6 was used in this research, and the geometries of plant and operating conditions of safety system were obtained from TEPCO through OECD/NEA BSAF Project.

  18. Operable Unit Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of operable unit data from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times and...

  19. Effect of cerium addition on the microstructure, electrical and relaxor behavior of Sr{sub 0.5}Ba{sub 0.5}Nb{sub 2}O{sub 6} ceramics

    Energy Technology Data Exchange (ETDEWEB)

    Velayutham, T.S., E-mail: t_selvi@um.edu.my; Salim, N.I.F.; Gan, W.C.; Abd Majid, W.H.

    2016-05-05

    Sr{sub 0.5}Ba{sub 0.5}Nb{sub 2}O{sub 6} (SBN50) ceramic doped with different concentrations of Cerium (Ce) according to the stoichiometry formulation of Sr{sub 0.5-3y/2}Ba{sub 0.5}Ce{sub y}Nb{sub 2}O{sub 6} (Ce-SBN) with y = 0, 0.01, 0.02, 0.03, 0.04 and 0.05 was prepared using the conventional solid state reaction method. The morphology, structure, and electrical properties of the samples were studied using field emission scanning electron microscope (FESEM), X-ray diffraction (XRD), ferroelectric and dielectric spectroscopy, respectively. The FESEM images reveal a strong influence of cerium on the SBN microstructure. The X-ray diffraction patterns show that all compositions of SBN ceramic exhibit tetragonal tungsten bronze structure. As the dopant concentration, y increased, both unit cell volume and axial ratio c/a decreased gradually. In addition, dopant incorporation lowers the phase transition temperature, T{sub m}. As a result, all practical parameters are sufficiently increased, i.e. the dielectric constant and remnant polarization. SBN50 doped with a 3% Ce sample is most attractive for practical applications due to its high remnant polarization, P{sub r} = 58.6 μC/cm{sup 2} and dielectric constant, ε’ ≈ 8000 (10 kHz) at room temperature, respectively. - Highlights: • Sr{sub 0.5-3y/2}Ba{sub 0.5}Ce{sub y}Nb{sub 2}O{sub 6} synthesized using solid-state reaction method. • Cerium dopant improved the overall properties of SBN. • Dopant incorporation lowers the phase transition temperature, T{sub m}. • 3% Ce dopant exhibits best functional properties among the rest of the composition. • The P{sub r} of 3%Ce-doped SBN is 58.6 μC/cm{sup 2} and ε’ ≈ 8000 (10 kHz) at room temperature.

  20. Multipurpose units: combining of technological operations of a soil cultivating and seeding

    Directory of Open Access Journals (Sweden)

    D. A. Petukhov

    2015-01-01

    Full Text Available The modern domestic market of technique for grain crops seeding differs variety of machines brands and types. The intensive type technologies combining technological operations of a soil cultivating and grain crops seeding in one pass are more widely used. The authors have established that one-operational units in new machine park have to be replaced multipurpose, universal and combined machines. Such approach will reduce number of machines in grain production from 20-30 to 5-6 name titles. Possibilities of multipurpose sowing units for simultaneous fertilizers application, soil cultivating and weeds destruction were analyzed. It was specified that nowadays there are several technologies types with two, four or six operations overlapping. Operational performance, technological and economical efficiency of the best multipurpose and also efficiency of technological operations overlapping at grain crops cultivating in the conditions of their real operation and at a trial establishment in the Kuban research institute of information and technical and economic studies of agro-industrial complex engineering and technical services were studied. Tit was defined that use of multipurpose sowing units and also studied efficiency of decreases operational costs by 48-71 percent, fuel consumption - by 41-76 percent and reduces labor input by 72-80 percent. Thus grain crops seeding is possible in optimal agrotime because of 4-6 technological operations overlapping in one pass.

  1. A new silver metaniobate semiconductor of Ag0.5La0.5Nb2O6 with defect-perovskite structure

    Science.gov (United States)

    Mi, Longqing; Feng, Yongyi; Cao, Lei; Xue, Mingqiang; Huang, Yanlin; Qin, Lin; Seo, Hyo Jin

    2018-03-01

    Silver-containing lanthanum metaniobate Ag0.5La0.5Nb2O6 nanoparticles were synthesized by sol-gel polymerized complex method. A typical defect-perovskite structure was confirmed by XRD Rietveld refinements. The surface characteristics of the sample were tested by SEM, TEM and EDS measurements. SEM and TEM show that the sample presents ball-like particles with the diameters of 100 nm to 400 nm. The sample shows both self-activated luminescence and photocatalytic activities. Ag0.5La0.5Nb2O6 has a direct transition with band energy of 2.85 eV. The Ag4d-O2p hybridization in the valence band contributes to the narrowed band gap. The luminescence properties of Ag0.5La0.5Nb2O6 have been investigated for the first time. The luminescence is characterized by two emission centers with maximum wavelength near 460 and 530 nm. The emission and excitation spectra, decay curves and the thermal quenching mechanism were discussed. Ag0.5La0.5Nb2O6 shows the efficient photocatalytic activities and the photodegradation rate for methylene blue dye (MB) can reach about 95% under visible light (> 420 nm) irradiation in 5 h. The trapped experiments for the active species were tested and discussed, which verified that rad OH radicals could be the major active species in photocatalysis.

  2. Closure Report for Corrective Action Unit 330: Areas 6, 22, and 23 Tanks and Spill Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    A. T. Urbon

    2003-07-01

    This Closure Report (CR) documents the activities performed to close Corrective Action Unit (CAU) 330: Areas 6, 22, and 23 Tanks and Spill Sites, in accordance with the Federal Facility Agreement and Consent Order (FFACO of 1996), and the Nevada Division of Environmental Protection (NDEP)-approved Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 330: Areas 6, 22, and 23 Tanks and Spill Sites, Nevada Test Site (NTS), Nevada (U.S. Department of Energy, National Nuclear Security Administration Nevada Operation Office [NNSA/NV], 2001). CAU 330 consists of the following four Corrective Action Sites (CASs): 06-02-04, 22-99-06, 23-01-02, and 23-25-05 (Figure 1).

  3. 200-BP-5 operable unit treatability test report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites.

  4. 200-BP-5 operable unit treatability test report

    International Nuclear Information System (INIS)

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites

  5. Integrated Ground Operations Demonstration Units

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the AES Integrated Ground Operations Demonstration Units (IGODU) project is to demonstrate cost efficient cryogenic operations on a relevant...

  6. Physical protection of nuclear operational units

    International Nuclear Information System (INIS)

    1981-07-01

    The general principles of and basic requirements for the physical protection of operational units in the nuclear field are established. They concern the operational units whose activities are related with production, utilization, processing, reprocessing, handling, transport or storage of materials of interest for the Brazilian Nuclear Program. (I.C.R.) [pt

  7. An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management

    Science.gov (United States)

    2010-12-01

    An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management ______________________________________ By...Report 4. TITLE AND SUBTITLE: An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management 6...Level Training; United States Marine Corps; Operations Management ; Supply Chain Management; Process Analysis 16. PRICE CODE 17. SECURITY

  8. 46 CFR 97.05-5 - Charts and nautical publications.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Charts and nautical publications. 97.05-5 Section 97.05... OPERATIONS Notice to Mariners and Aids to Navigation § 97.05-5 Charts and nautical publications. As... tables; (g) Current tables; and (h) All other nautical publications necessary. 1 1 For United States...

  9. 39 CFR 3.6 - Information furnished to Board-financial and operating reports.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Information furnished to Board-financial and operating reports. 3.6 Section 3.6 Postal Service UNITED STATES POSTAL SERVICE THE BOARD OF GOVERNORS OF THE U.S. POSTAL SERVICE BOARD OF GOVERNORS (ARTICLE III) § 3.6 Information furnished to Board—financial...

  10. Approach and plan for cleanup actions in the 100-IU-2 and 100-IU-6 Operable Units of the Hanford Site

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of this document is to summarize waste site information gathered to date relating to the 100-IU-2 and 100-IU-6 Operable Units (located at the Hanford Site in Richland, Washington), and to plan the extent of evaluation necessary to make cleanup decisions for identified waste sites under the Comprehensive Environmental Response, Compensation, and Liability Act of 1981. This is a streamlined approach to the decision-making process, reducing the time and costs for document preparation and review

  11. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    International Nuclear Information System (INIS)

    Kim, Man Cheol

    2014-01-01

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated

  12. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Man Cheol [Chungang University, Seoul (Korea, Republic of)

    2014-08-15

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated.

  13. Nuclear units operating improvement by using operating experience

    International Nuclear Information System (INIS)

    Rotaru, I.; Bilegan, I.C.

    1997-01-01

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  14. Pilgrim Nuclear Power Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    Net electrical power generated was 2,415,511 MWH with the generator on line 5,333.6 hrs. Information is presented concerning operations, procedure changes, tests, experiments, maintenance, unit shutdowns and power reductions, and radiation doses to personnel

  15. Quad-Cities Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 2,024,125 net electrical MWH and the generator was on line 3162.6 hours. Unit 2 generated 746,184 net electrical MWH and was on line 1475.3 hrs. Data is included concerning operations, power generation, shutdowns, maintenance, changes, and tests. (FS)

  16. Safety measure S 05 'Sump clogging risk'

    International Nuclear Information System (INIS)

    Murani, J.

    1997-01-01

    This paper dealt with the safety measure S 05 'Sump clogging risk'. Problem specification contains: (1) to determine the effective strainer surface needed to be available in order to assure sufficient coolant volumes for a reliable operation of emergency systems; (2) to determine quantity and structure of insulation material which can be dislodged and can induce strained clogging; (3) to verify properties of insulation material with regard to its thermal degradation as a result of a long-term reactor unit operation; (4) to design and erect strainers so to assure sufficient congestion of emergency pump intake lines in post-accident regimes; (5) to design seismically resistant strainers with a capability to resist dynamic impacts from adjacent piping; (6) to assure monitoring of the strainer condition in real time with signals sent to the main control room

  17. Operation and Maintenance Plan for the 300-FF-5 Operable Unit

    International Nuclear Information System (INIS)

    Singleton, K.M.

    1996-09-01

    This document is the operation and maintenance plan for the 300-FF-5 groundwater operable unit. The purpose of this plan is to identify tasks necessary to verify the effectiveness of the selected alternative. This plan also describes the monitoring program and administrative tasks that will be used as the preferred alternative for the remediation of groundwater in the 300-FF-5 Operable Unit. The preferred alternative selected for remediation of groundwater consists of institutional controls

  18. Safety evaluation report related to the operation of Waterford Steam Electric Station, Unit No. 3 (Docket No. 50-382). Suppl.6

    International Nuclear Information System (INIS)

    1984-06-01

    Supplement 6 to the Safety Evaluation Report for the application filed by Louisiana Power and Light Company for a license to operate the Waterford Steam Electric Station, Unit 3 (Docket No. 50-382), located in St. Charles Parish, Louisiana, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing the staff's evaluation of information submitted by the applicant since the Safety Evaluation Report and its five previous supplements were issued

  19. Safety Evaluation Report related to the operation of Clinton Power Station, Unit No. 1 (Docket No. 50-461). Supplement No. 6

    International Nuclear Information System (INIS)

    1986-07-01

    Supplement No. 6 to the Safety Evaluation Report on the application filed by Illinois Power Company, Soyland Power Cooperative, Inc., and Western Illinois Power Cooperative, Inc., as applicants and owners, for a license to operate the Clinton Power Station, Unit No. 1, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Harp Township, DeWitt County, Illinois. This supplement reports the status of items that have been resolved by the staff since Supplement No. 5 was issued

  20. Junior Leader Training Development in Operational Units

    Science.gov (United States)

    2012-04-01

    UNITS Successful operational units do not arise without tough, realistic, and challenging training. Field Manual (FM) 7-0, Training Units and D...operations. The manual provides junior leaders with guidance on how to conduct training and training management. Of particular importance is the definition...1 Relation htp between ADDIE and the Anny Training Management Model. The Army Training Management Model and ADDIE process appear in TRADOC PAM 350

  1. Analysis of Serbian Military Riverine Units Capability for Participation in the United Nations Peacekeeping Operations

    Directory of Open Access Journals (Sweden)

    Slobodan Radojevic

    2017-06-01

    Full Text Available This paper analyses required personnel, training capacities and equipment for participation in the United Nations peacekeeping operations with the riverine elements. In order to meet necessary capabilities for engagement in United Nations peacekeeping operations, Serbian military riverine units have to be compatible with the issued UN requirements. Serbian Armed Forces have the potential to reach such requirements with the River Flotilla as a pivot for the participation in UN missions. Serbian Military Academy adopted and developed educational and training program in accordance with the provisions and recommendations of the IMO conventions and IMO model courses. Serbian Military Academy has opportunities for education and training military riverine units for participation in the United Nations peacekeeping operations. Moreover, Serbia has Multinational Operations Training Center and Peacekeeping Operations Center certified to provide selection, training, equipping and preparations of individuals and units to the United Nations multinational operations.

  2. Point Beach Nuclear Plant, Units 1 and 2. Semiannual operating report No. 10, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 operated at an average capacity factor of 65.2 percent with a net efficiency of 31.41 percent. Unit 2 operted at an average capacity factor of 88.6 lpercent with a net efficiency of 32.28 percent. Unit 1 was essentially base loaded while Unit 2 operated on load follow. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  3. Performance assessment for continuing and future operations at Solid Waste Storage Area 6

    International Nuclear Information System (INIS)

    1994-02-01

    This radiological performance assessment for the continued disposal operations at Solid Waste Storage Area 6 (SWSA 6) on the Oak Ridge Reservation (ORR) has been prepared to demonstrate compliance with the requirements of the US DOE. The analysis of SWSA 6 required the use of assumptions to supplement the available site data when the available data were incomplete for the purpose of analysis. Results indicate that SWSA 6 does not presently meet the performance objectives of DOE Order 5820.2A. Changes in operations and continued work on the performance assessment are expected to demonstrate compliance with the performance objectives for continuing operations at the Interim Waste Management Facility (IWMF). All other disposal operations in SWSA 6 are to be discontinued as of January 1, 1994. The disposal units at which disposal operations are discontinued will be subject to CERCLA remediation, which will result in acceptable protection of the public health and safety

  4. Performance assessment for continuing and future operations at Solid Waste Storage Area 6

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This radiological performance assessment for the continued disposal operations at Solid Waste Storage Area 6 (SWSA 6) on the Oak Ridge Reservation (ORR) has been prepared to demonstrate compliance with the requirements of the US DOE. The analysis of SWSA 6 required the use of assumptions to supplement the available site data when the available data were incomplete for the purpose of analysis. Results indicate that SWSA 6 does not presently meet the performance objectives of DOE Order 5820.2A. Changes in operations and continued work on the performance assessment are expected to demonstrate compliance with the performance objectives for continuing operations at the Interim Waste Management Facility (IWMF). All other disposal operations in SWSA 6 are to be discontinued as of January 1, 1994. The disposal units at which disposal operations are discontinued will be subject to CERCLA remediation, which will result in acceptable protection of the public health and safety.

  5. 7 CFR 275.6 - Management units.

    Science.gov (United States)

    2010-01-01

    ... FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Management Evaluation (ME... management unit; (iii) Food Stamp Program participation, including the number of persons and number of... 7 Agriculture 4 2010-01-01 2010-01-01 false Management units. 275.6 Section 275.6 Agriculture...

  6. POST-CLOSURE INSPECTION REPORT FOR CORRECTIVE ACTION UNIT 92: AREA 6 DECON PAD FACILITY, NEVADA. TEST SITE NEVADA, FOR THE PERIOD JANUARY 2004 - DECEMBER 2004

    International Nuclear Information System (INIS)

    BECHTEL NEVADA

    2005-01-01

    This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility, Nevada Test Site, Nevada. CAU 92 was closed in accordance with the Resource Conservation and Recovery Act (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection, 1995) and the Federal Facility Agreement and Consent Order of 1996 on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs): CAS 06-04-01, Decon Pad oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02, Decontamination Pond (RCRA), requires post-closure inspections. CAS 06-04-01, Decon Pad Oil/Water Separator, is located inside the fence at the Building 6-605 compound. This report covers the annual period January 2004 through December 2004

  7. File list: Oth.Emb.05.AllAg.1-6h_embryos [Chip-atlas[Archive

    Lifescience Database Archive (English)

    Full Text Available Oth.Emb.05.AllAg.1-6h_embryos dm3 TFs and others Embryo 1-6h embryos SRX033315,SRX0...26864 http://dbarchive.biosciencedbc.jp/kyushu-u/dm3/assembled/Oth.Emb.05.AllAg.1-6h_embryos.bed ...

  8. 200-UP-2 Operable Unit technical baseline report

    International Nuclear Information System (INIS)

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The ''U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO 3 ) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO 3 Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab

  9. Analysis of operating reliability of WWER-1000 unit

    International Nuclear Information System (INIS)

    Bortlik, J.

    1985-01-01

    The nuclear power unit was divided into 33 technological units. Input data for reliability analysis were surveys of operating results obtained from the IAEA information system and certain indexes of the reliability of technological equipment determined using the Bayes formula. The missing reliability data for technological equipment were used from the basic variant. The fault tree of the WWER-1000 unit was determined for the peak event defined as the impossibility of reaching 100%, 75% and 50% of rated power. The period was observed of the nuclear power plant operation with reduced output owing to defect and the respective time needed for a repair of the equipment. The calculation of the availability of the WWER-1000 unit was made for different variant situations. Certain indexes of the operating reliability of the WWER-1000 unit which are the result of a detailed reliability analysis are tabulated for selected variants. (E.S.)

  10. Licensed operating reactors. Operating units status report, data as of 2-28-79

    International Nuclear Information System (INIS)

    1979-03-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices and IE Headquarters; and the third section is an appendix containing comparative statistics of U.S. nuclear/fossil capacity, identification of nuclear power plants within regional Electric Reliability Councils, the relative status of U.S. nuclear electric production to all U.S. electric production by state, and selected Edison Electric Institute operating statistics. Throughout the report, statistical factors for periods greater than a report month, or for more than one unit, are computed as the arithmetic average of each unit's individual operating statistics. The statistical factors for each unit for the report month are computed from actual power production for the month. The factors for the life-span of each unit (the ''Cumulative'' column) are reported by the utility and are not entirely re-computed by NRC. Utility power production data is checked for consistency with previously submitted statistics

  11. Effect of RCIC Operating Conditions on the Accident Scenario in Fukushima Unit 2

    International Nuclear Information System (INIS)

    Kim, Sung Il; Park, Jong Hwa; Ha, Kwang Soon

    2015-01-01

    This study was conducted by using MELCOR 1.8.6. Fukushima unit 2 accident was analyzed using MELCOR in this study, and best estimate scenario with considering RCIC operating conditions was presented. Researches on the boiling water reactor (BWR) plant with reactor core isolation cooling (RCIC) system have been conducted. Research on the RCIC operation in Fukushima unit 2 was also conducted by Sandia National Laboratory. MELCOR analysis of the Fukushima unit 2 accident was conducted in the report and energy balance in wetwell was described by considering RCIC operation. However, the effect of RCIC operation condition on the accident scenario has not been studied. The operating conditions of RCIC system affect the pressures in wetwell and drywell, and the high pressure can make leakage path of fission product from PCV to reactor building. Thus it can be directly related with the amount of fission product which released to environment. In this study, severe accident on Fukushima unit 2 was analyzed considering the operating condition of RCIC system, and best estimated scenario was presented. In addition, the effect of RCIC turbine efficiency on the accident progression was examined. Energy balance in suppression chamber was also considered with discussion on the effect of torus room flooding level. It was found that the operating condition of RCIC turbine not only affects the variation of drywell pressure but also the amount of released fission products to environment. It was also confirmed that the RCIC turbine efficiency in the accident would be less than normal operating condition

  12. Proximity effect of Pb on CeCu6 and La0.05Ce0.95Cu6

    International Nuclear Information System (INIS)

    Chen, T.P.; Tipparachi, U.; Yang, H.D.; Wang, J.T.; Chen, B.; Chen, J.C.J.

    1999-01-01

    Heavy fermion materials have attracted a great deal of attention since 1979. These materials which contain a rare earth (U, or Ce, etc.) element exhibit unusual behavior at low temperature. The effective mass m* of the Landau quasiparticles is found to be orders of magnitude higher than that of a bare electron. Some of the Heavy Fermion materials become superconductors at low temperature. The pairing of electrons in these superconductors may not be of s symmetry like those in BCS type superconductors. The mismatch in electronic mass and the difference in pairing state between the light conventional superconducting electrons and the heavy fermion electrons have brought the coupling between light electrons (BCS type) and the heavy fermion electrons into question. Proximity effect of Pb on CeCu 6 , Pb on La 0.05 Ce 0.95 Cu 6 , and Pb on Cu was used to investigate the coupling between the conventional superconducting electrons of Pb and the heavy electrons in CeCu 6 or La 0.05 Ce 0.95 Cu 6 . In this experiment proximity effect was found between Pb and CeCu 6 , as well as between Pb and La 0.05 Ce 0.95 Cu 6 . However, the proximity effect is small when compared with that between Pb and Cu. This indicates a much shorter extrapolation length in the heavy fermion materials than in Cu. Such a phenomenon can be explained by the mismatch in effective mass between the superconducting Pb electrons and the heavy fermion electrons

  13. Initial startup and operations of Yonggwang Units 3 and 4

    International Nuclear Information System (INIS)

    Collier, T.J.; Chari, D.R.; Kiraly, F.

    1996-01-01

    A significant milestone in the nuclear power industry was achieved in 1995, when Yonggwang (YGN) Units 3 and 4 were accepted into in commercial operation by Korea Electric Power Corporation (KEPCO). YGN Unit 3 was accepted into commercial operation on March 31, 1995, the original date established during project initiation. YGN Unit 4 was accepted into operation on January 1, 1996, 3 months ahead of schedule. Each YGN unit produces approximately 1,050 Mwe and supplies approximately ten percent of the total electric power demand in the Republic of Korea (ROK). The overall plant efficiency is approximately 37% which is at least 1% higher than most nuclear units. Since achieving commercial operation, YGN Unit 3 has operated at essentially full power which has resulted in an annual performance rate in excess of 85%. YGN Unit 3 is the first of six pressurized water reactors which are currently under design and construction in the ROK and serves as the reference design for the Korean Standard Nuclear Power Plant program. Both YGN Units 3 and 4 include a System 800 Nuclear Steam Supply System (NSSS). The NSSS is rated at 2,815 Mwth and is the ABB-CE standard design. The design includes numerous advanced design features which enhance plant safety, performance and operability. A well executed startup test program was successfully completed on both units prior to commercial operation. A summary of the YGN NSSS design features, the startup test program and selected test results demonstrating the performance of those features are presented in this paper

  14. Operating performance of LWR nuclear generating units

    International Nuclear Information System (INIS)

    Pia, S.

    1984-01-01

    This work aims at reviewing, on the basis of historical data, the operational problem areas which explain the degree of availability and productivity achieved up to now by nuclear power plants in commercial operation in the world. The operating performance data of nuclear power plants area analysed with respect to plant type, size and other significant reference parameters and they are evaluated also by comparison with fossil generating unit data. Major performance indices data are presented for both nuclear and fossil units type and distribution of outage causes. Unplanned full outages caused by nuclear power plant equipment and components failure are particulary emphasized. The trend for unplanned full outages due to the failure of components shows decreasing numerical values in 1981 with respect to the previous years. But this result should be weighed with the increasing plant unavailability hours needed for maintenance and repair action (chiefly preventive maintenance on critical components). This means that the number and downtime of forced outage must be drastically reduced for economic reasons (production losses and problems associated with the unavailable unit unplanned replacement) as well as for plant safe and reliable operation (sudden unavailability of key components and frequency of transients associated with plant shutdown and routine startup operation)

  15. Peach Bottom Atomic Power Station, Units 2 and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 2 experienced 11 forced outages, 5 power reductions, and one major refueling outage which lasted about 3 months during which time the feedwater spargers were replaced. Net electrical power generated was 5,569,633 MWH with the generator on line 5,998 hrs. Unit 3 experienced 17 forced outages, 11 power reductions and 2 major outages. The first refueling outage began 12/24/77. Net electrical power generated was 6,049,644 MWH with the unit on line 6,829 hrs. Information is presented concerning operations, personnel exposures, radioactive releases, maintenance, and irradiated fuel examination

  16. The single crystal structure determination of Ln{sub 6}MnSb{sub 15} (Ln=La, Ce), Ln{sub 6}Mn{sub 1-x}Zn{sub x}Sb{sub 15} (x∝0.5), and Ln{sub 6}ZnSb{sub 15} (Ln=La-Pr)

    Energy Technology Data Exchange (ETDEWEB)

    Benavides, Katherine A.; McCandless, Gregory T.; Chan, Julia Y. [Texas Univ., Dallas, Richardson, TX (United States). Dept. of Chemistry and Biochemistry

    2017-09-01

    Single crystals of Ln{sub 6}MnSb{sub 15} (Ln=La, Ce), Ln{sub 6}Mn{sub 1-x}Zn{sub x}Sb{sub 15} (x∝0.5), and Ln{sub 6}ZnSb{sub 15} (Ln=La-Pr) have been successfully grown and the compounds adopt the orthorhombic Ln{sub 6}MnSb{sub 15} structure type (space group Immm), with a∝4.3 Aa, b∝15 Aa, and c∝19 Aa. This structure is comprised of antimony nets and antimony ribbons which exhibit positional disorder at connecting points between antimony substructures, in addition to two partially occupied transition metal sites. The unit cell volumes of the La analogs displayed a systematic decrease upon Zn substitution. However, for the Ce{sub 6}Mn{sub 1-x}Zn{sub x}Sb{sub 15} and Pr{sub 6}Mn{sub 1-x}Zn{sub x}Sb{sub 15} (x∝0.5), the volumes deviate from linearity as observed in the parent compounds.

  17. Dresden Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January thru December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 953,015.5 MWH with the generator on line 7,399.37 hrs. Unit 2 generated 4,371,553.689 MWH with the generator on line 6,664.58 hrs while Unit 3 generated 4,034,251 MWH with the generator on line 7,234.86 hrs. Information is presented concerning operations, maintenance, and shutdowns

  18. 36 CFR 6.4 - Solid waste disposal sites not in operation on September 1, 1984.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Solid waste disposal sites... PARK SERVICE, DEPARTMENT OF THE INTERIOR SOLID WASTE DISPOSAL SITES IN UNITS OF THE NATIONAL PARK SYSTEM § 6.4 Solid waste disposal sites not in operation on September 1, 1984. (a) No person may operate...

  19. Analysis on Biomechanical Characteristics of Post-operational Vertebral C5-C6 Segments

    Directory of Open Access Journals (Sweden)

    Heqiang Tian

    2016-03-01

    Full Text Available Both anterior cervical decompression and fusion (ACDF and artificial cervical disc replacement (ACDR have obvious advantages in the treatment of cervical spondylosis. To analyze the operation results, it is absolutely necessary to study the biomechanics of the movement range of post-operational vertebral C5-C6 segments, especially the biomechanical characteristics in cervical tissues in actual movements. In this study, using the human vertebral 3D graph gained by imaging diagnosis (CT, a vertebral solid model is established by the 3D reconstruction algorithm and reverse engineering technology. After that, with cervical soft tissue structure added to the solid model and set with a joint contact mechanism, a finite element model with a complete, accurate cervical C5-C6 kinematic unit is constructed, based on relevant physiological anatomical knowledge. This model includes vertebral segments, an intervertebral disc, ligament and zygopophysis in the cervical C5-C6 kinematic unit. In the created vertebral finite element model, the model is amended, referring to ACDF and ACDR, and the load and constraint are applied to a normal group, a fusion group and a displacement group, so as to analyze the biomechanical characteristics of the cervical vertebra after ACDF and ACDR. By comparing the finite element simulation results of different surgeries, this paper is intended to evaluate the functions and biomechanical behaviors of the post-operational vertebra, and explore the influence of the operation on the biomechanical stability of the cervical vertebra. This will provide theoretical guidance for implementation and optimization of ACDF and ACDR.

  20. Area 6 Decontamination Pond Corrective Action Unit 92 Post-Closure Inspection Annual Report for the Period January 2000-December 2000

    International Nuclear Information System (INIS)

    Traynor, J. L.

    2001-01-01

    The Area 6 Decontamination Pond, Corrective Action Unit 92, was closed in accordance with the Resource Conservation and Recovery Act (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection [NDEP, 1995]) and the Federal Facility Agreement and Consent Order (NDEP, 1996) on May 11, 1999. Historically the Decontamination Pond was used for the disposal of partially treated liquid effluent discharged from the Decontamination Facility (Building 6-05) and the Industrial Laundry (Building 6-07) (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1996). The Decontamination Pond was constructed and became operational in 1979. Releases of RCRA-regulated hazardous waste or hazardous waste constituents have not been discharged to the Decontamination Pond since 1988 (DOE/NV, 1996). The pipe connecting the Decontamination Pond and Decontamination Facility and Industrial Laundry were cut and sealed at the Decontamination Pad Oil/Water Separator in 1992. The Decontamination Pond was closed in place by installing a RCRA cover. Fencing was installed around the periphery to prevent accidental damage to the cover. Post-closure monitoring at the site consists of quarterly inspections of the RCRA cover and fencing, and a subsidence survey. Additional inspections are conducted if: Precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in]) in a 24-hour period, or An earthquake occurs with a magnitude exceeding 4.5 on the Richter scale within 100 kilometers (km) (62 miles [mi]) of the closure

  1. Area 6 Decontamination Pond Corrective Action Unit 92 Post-Closure Inspection Annual Report for the Period January 2000-December 2000

    Energy Technology Data Exchange (ETDEWEB)

    J. L. Traynor

    2001-03-01

    The Area 6 Decontamination Pond, Corrective Action Unit 92, was closed in accordance with the Resource Conservation and Recovery Act (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection [NDEP, 1995]) and the Federal Facility Agreement and Consent Order (NDEP, 1996) on May 11, 1999. Historically the Decontamination Pond was used for the disposal of partially treated liquid effluent discharged from the Decontamination Facility (Building 6-05) and the Industrial Laundry (Building 6-07) (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1996). The Decontamination Pond was constructed and became operational in 1979. Releases of RCRA-regulated hazardous waste or hazardous waste constituents have not been discharged to the Decontamination Pond since 1988 (DOE/NV, 1996). The pipe connecting the Decontamination Pond and Decontamination Facility and Industrial Laundry were cut and sealed at the Decontamination Pad Oil/Water Separator in 1992. The Decontamination Pond was closed in place by installing a RCRA cover. Fencing was installed around the periphery to prevent accidental damage to the cover. Post-closure monitoring at the site consists of quarterly inspections of the RCRA cover and fencing, and a subsidence survey. Additional inspections are conducted if: Precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in]) in a 24-hour period, or An earthquake occurs with a magnitude exceeding 4.5 on the Richter scale within 100 kilometers (km) (62 miles [mi]) of the closure.

  2. POST-CLOSURE INSPECTION REPORT FOR CORRECTIVE ACTION UNIT 92: AREA 6 DECON POND FACILITY, NEVADA TEST SITE, NEVADA FOR CALENDAR YEAR 2005

    International Nuclear Information System (INIS)

    2006-01-01

    This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility, Nevada Test Site, Nevada. CAU 92 was closed in accordance with the Resource Conservation and Recovery Act (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection (NDEP), 1995) and the Federal Facility Agreement and Consent Order of 1996. Closure activities were completed on February 16, 1999, and the Closure Report (U.S. Department of Energy, Nevada Operations Office, 1999) was approved and a Notice of Completion issued by the NDEP on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs): CAS 06-04-01, Decon Pad Oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02 requires post-closure inspections. Visual inspections of the cover and fencing at CAS 06-05-02 are performed quarterly. Additional inspections are conducted if precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in]) in a 24-hour period. This report covers calendar year 2005. Quarterly site inspections were performed in March, June, September, and December of 2005. All observations indicated the continued integrity of the unit. No issues or concerns were noted, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A. Five additional inspections were performed after precipitation events that exceeded 1.28 cm (0.50 in) within a 24-hour period during 2005. No significant changes in site conditions were noted during these inspections, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A. Precipitation records for 2005 are included in Appendix C

  3. Features of Computerized Procedure System of Shin-Kori unit 5 and 6

    International Nuclear Information System (INIS)

    Seong, Nokyu; Jung, Yeonsub; Sung, Chanho

    2016-01-01

    The Computerized Procedure System (CPS) is one of the Man Machine Interface (MMI) resources of Main Control Room (MCR) of the Advanced Power Reactor 1400 (APR1400). The CPS has been continuously improved since it was installed in Shin-Kori unit 3 and 4. The Korea Hydro Nuclear Power Central Research Institute (KHNP CRI) has found the points of improvement of CPS through CPS centered Human Factors Engineering Verification and Validation (HFE V and V) and Operating Experience Review (OER) of reference power plant. This paper shows the main features of CPS of Shin-Kori 5 and 6 unit. This paper shows the main features of CPS of Shin-Kori 5 and 6. These are some of improvements of CPS. This prototype of CPS currently is implementing in CRI. The respective function can be more detailed after testing the prototype. These features will be applied to Shin-Kori 5 and 6 CPS after HFE V and V

  4. Features of Computerized Procedure System of Shin-Kori unit 5 and 6

    Energy Technology Data Exchange (ETDEWEB)

    Seong, Nokyu; Jung, Yeonsub; Sung, Chanho [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    The Computerized Procedure System (CPS) is one of the Man Machine Interface (MMI) resources of Main Control Room (MCR) of the Advanced Power Reactor 1400 (APR1400). The CPS has been continuously improved since it was installed in Shin-Kori unit 3 and 4. The Korea Hydro Nuclear Power Central Research Institute (KHNP CRI) has found the points of improvement of CPS through CPS centered Human Factors Engineering Verification and Validation (HFE V and V) and Operating Experience Review (OER) of reference power plant. This paper shows the main features of CPS of Shin-Kori 5 and 6 unit. This paper shows the main features of CPS of Shin-Kori 5 and 6. These are some of improvements of CPS. This prototype of CPS currently is implementing in CRI. The respective function can be more detailed after testing the prototype. These features will be applied to Shin-Kori 5 and 6 CPS after HFE V and V.

  5. Biota of the 300-FF-1 operable unit. [Westinghouse Hanford Company

    Energy Technology Data Exchange (ETDEWEB)

    Rickard, W.H. Jr.; Fitzner, R.E.; Brandt, C.A.

    1990-10-01

    This report summarizes Task 5a-2 of the Phase I Remedial Investigation -- Operable Unit Characterization of the 300-FF-1 Operable Unit on the Hanford Site, near Richland, Washington. The ultimate goal of Phase I is to determine the nature and extent of the threat to public health and the environment from releases of hazardous substances from the operable unit. The purpose of Task 5a-2 was to determine what species inhabit the 300-FF-1 Operable Unit and how they use the unit. The focus is on those species listed as endangered or threatened, those that are economically important, or those that constitute significant components of the human food chain. 39 refs., 5 figs., 5 tabs.

  6. Implementation dimension-6 operators into WHIZARD

    Energy Technology Data Exchange (ETDEWEB)

    Shim, So Young; Reuter, Juergen [DESY, Hamburg (Germany)

    2016-07-01

    To test physics beyond the Standard Model (SM) at the LHC in a model-independent way, we studied an Effective Field Theory (EFT) consisting of the SM with additional dimension-6 operators. Using a special basis for the operators, the GIMR basis, we implemented the complete set of dim-6 operators into the Monte Carlo Event Generator WHIZARD. Focusing on electroweak boson observables, we show preliminary results for LHC Run II at 13 TeV.

  7. Feasibility study report for the 200-BP-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9{times}10{sup {minus}5}.

  8. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9x10 -5

  9. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1994-01-01

    This feasibility study (FS) examines a range of alternatives and provides recommendations for selecting a preferred altemative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965-1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-:levels of contamination with cesium-137, radium-226, strontium-90, thorium-228 and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9 x 10 5

  10. Superfund Record of Decision (EPA Region 6): United Nuclear Corporation, Mckinley County, New Mexico, ground-water operable unit (first remedial action) September 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The United Nuclear Corporation (UNC) site is located approximately 17 miles northeast of Gallup, New Mexico in McKinley County. The site operated as a State-licensed uranium mill facility from June 1977 to May 1982. It includes an ore-processing mill (about 25 acres) and an unlined tailings pond area (about 100 acres). In July 1979, approximately 23 million gallons of tailings and pond water were released to a nearby river as a result of a dam breach in the tailings pond area. The site damage was repaired; however, attention was focused on ground-water contamination resulting from tailings seepage. Nevertheless, the offsite migration of radionuclides and chemical constituents from uranium milling byproduct materials into the ground water, as well as to surface water and air, are still principal threats at the site. The remedial action will address onsite ground water contamination. Source control and onsite surface reclamation will be implemented under the direction of the Nuclear Regulatory Commission and integrated with this ground water operable unit. The primary contaminants of concern affecting the ground water are metals including arsenic, and radioactive substances including radium-226/228 and gross alpha. The selected remedial action for the site is included

  11. Magnetic and magnetocaloric properties of the alloys Mn2-xFexP0.5As0.5 (0⩽x⩽0.5)

    Science.gov (United States)

    Gribanov, I. F.; Golovchan, A. V.; Varyukhin, D. V.; Val'kov, V. I.; Kamenev, V. I.; Sivachenko, A. P.; Sidorov, S. L.; Mityuk, V. I.

    2009-10-01

    The results of investigations of the magnetic and magnetocaloric properties of alloys from the system Mn2-xFexP0.5As0.5 (0⩽x⩽0.5) are presented. The magnetization measurements are performed in the temperature interval 4.2-700K in magnetic fields up to 8T. The entropy changes ΔS with the magnetic field changing from 0 to 2, 4, 5, and 8T are determined from the magnetization isotherms obtained near temperatures of the spontaneous appearance of the ferromagnetic state (TC,TAF -FM1), and the curves ΔS(T0) are constructed. It is found that TC and TAF-FM1 decrease monotonically with increasing manganese concentration and that the ferromagnetic phase is completely suppressed in Mn1.5Fe0.5P0.5As0.5. It is found that the concentration dependences of the maximum entropy jump (and the corresponding cold-storage capacity) and the magnitudes of the ferromagnetic moment of the unit cell with maxima for x =0.9 and 0.8 show extremal behavior. The data obtained are compared with the ferromagnetic moments calculated from first principles by the Korringa-Kohn-Rostoker method using the coherent-potential approximation (KKR-CPA)—the discrepancy for 0.5⩽x⩽0.7 is attributed to the appearance of an antiferromagnetic component of the magnetic structure. It is concluded that the alloys Mn2-xFexP0.5As0.5 have promise for use in magnetic refrigerators operating at room temperature.

  12. Surry Power Station, Units 1 and 2. Semiannual operating report, July--December 1974

    International Nuclear Information System (INIS)

    1974-01-01

    Net electric power generated by Surry Unit 1 was 6,930,353 MWH with the generator on line for 10,417.7 hours. Net electric power generated by Unit 2 was 5,699,299 MWH with the generator on line for 8,384.2 hours. Information is presented concerning operation, radioactive effluent releases, solid radioactive wastes, fuel shipments, occurrences in which temperature limitations on the condenser cooling water discharge were exceeded, changes in station organization, occupational personnel radiation exposure, nonradiological monitoring including thermal, physical, and biological programs, and the radiological environmental monitoring program. (U.S.)

  13. Small break LOCA analysis for YGN 5 and 6 RCP trip strategy in power mode operation

    International Nuclear Information System (INIS)

    Kim, Tech Mo; Choi, Han Rim

    2001-01-01

    A continued operation of Reactor Coolant Pumps(RCPs) during a Small Break Loss of Coolant Accident(SBLOCA) in all operation mode may increase unnecessary inventory loss from the Reactor Coolant System(RCS) causing a severe core uncovery which might lead to fuel failure. After Three Mile Island Unit 2(TMI-2) accident, the Combustion Engineering Owner Group(CEOG) developed RCP trip strategy called 'Trip-Two/Leave-Two' (T2/L2). The T2/L2 RCP trip strategy consists of tripping the first two RCPs on low RCS pressure and then tripping the remaining two RCPs if a LOCA has occurred. This analysis demonstrates the inherent safety of RCP trip strategy during an SBLOCA for Youggwang Nuclear Power Plant Unit 5 and 6(YGN 5 and 6). The trip setpoint of the first two RCPs for YGN 5 and 6 is calculated to be 1721 psia in pressurizer pressure based on the limiting SBLOCA with 0.15 ft 2 break size in the hot leg. The analysis results show that YGN 5 and 6 can maintain the core coolability even if the operator fails to trip the second two RCPs or trips at the worst time of minimum liquid inventory

  14. 200-BP-5 operable unit Technical Baseline report

    International Nuclear Information System (INIS)

    Jacques, I.D.; Kent, S.K.

    1991-10-01

    This report supports development of a remedial investigation/feasibility study work plan for the 200-BP-5 operable unit. The report summarizes baseline information for waste sites and unplanned release sites located in the 200-BP-5 operable unit. The sites were investigated by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The investigation consisted of review and evaluation of current and historical Hanford Site reports, drawings, and photographs, and was supplemented with recent inspections of the Hanford Site and employee interviews. No field investigations or sampling were conducted

  15. Unpacking Referent Units in Fraction Operations

    Science.gov (United States)

    Philipp, Randolph A.; Hawthorne, Casey

    2015-01-01

    Although fraction operations are procedurally straightforward, they are complex, because they require learners to conceptualize different units and view quantities in multiple ways. Prospective secondary school teachers sometimes provide an algebraic explanation for inverting and multiplying when dividing fractions. That authors of this article…

  16. Centrifugal microfluidic platforms: advanced unit operations and applications.

    Science.gov (United States)

    Strohmeier, O; Keller, M; Schwemmer, F; Zehnle, S; Mark, D; von Stetten, F; Zengerle, R; Paust, N

    2015-10-07

    Centrifugal microfluidics has evolved into a mature technology. Several major diagnostic companies either have products on the market or are currently evaluating centrifugal microfluidics for product development. The fields of application are widespread and include clinical chemistry, immunodiagnostics and protein analysis, cell handling, molecular diagnostics, as well as food, water, and soil analysis. Nevertheless, new fluidic functions and applications that expand the possibilities of centrifugal microfluidics are being introduced at a high pace. In this review, we first present an up-to-date comprehensive overview of centrifugal microfluidic unit operations. Then, we introduce the term "process chain" to review how these unit operations can be combined for the automation of laboratory workflows. Such aggregation of basic functionalities enables efficient fluidic design at a higher level of integration. Furthermore, we analyze how novel, ground-breaking unit operations may foster the integration of more complex applications. Among these are the storage of pneumatic energy to realize complex switching sequences or to pump liquids radially inward, as well as the complete pre-storage and release of reagents. In this context, centrifugal microfluidics provides major advantages over other microfluidic actuation principles: the pulse-free inertial liquid propulsion provided by centrifugal microfluidics allows for closed fluidic systems that are free of any interfaces to external pumps. Processed volumes are easily scalable from nanoliters to milliliters. Volume forces can be adjusted by rotation and thus, even for very small volumes, surface forces may easily be overcome in the centrifugal gravity field which enables the efficient separation of nanoliter volumes from channels, chambers or sensor matrixes as well as the removal of any disturbing bubbles. In summary, centrifugal microfluidics takes advantage of a comprehensive set of fluidic unit operations such as

  17. 7 CFR 1465.6 - AMA plan of operations.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false AMA plan of operations. 1465.6 Section 1465.6... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS AGRICULTURAL MANAGEMENT ASSISTANCE General Provisions § 1465.6 AMA plan of operations. (a) All conservation practices in the APO must be approved by...

  18. Twenty years of operation of WWER 440/230 units in Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Tomek, J.

    1998-01-01

    It is twenty years this year since the first unit WWER 440 of Slovak Nuclear Power Plant Jaslovske Bohunice was commissioned. There are four units WWER 440 in operation Jaslovske Bohunice site. First two units of older soviet PWR design V-230 (also known as V-1) and other two units of newer V-213 type (also known as V-2). The goal of this presentation is to summarize and evaluate the operation of Unit 1 and 2 for this period of time and mainly to describe what has been done and what is planned to be done to increase the nuclear safety and operational reliability of both units. The operating organization and regulatory authority assume that an internationally acceptable level of safety will be reached by accomplishing of the upgrading program.(author)

  19. Eielson Air Force Base Operable Unit 2 baseline risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, R.E.; Jarvis, T.T.; Jarvis, M.R.; Whelan, G.

    1994-10-01

    Operable Unit 2 at Eielson Air Force Base (AFB) near Fairbanks, is one of several operable units characterized by petroleum, oil, and lubricant contamination, and by the presence of organic products floating at the water table, as a result of Air Force operations since the 1940s. The base is approximately 19,270 acres in size, and comprises the areas for military operations and a residential neighborhood for military dependents. Within Operable Unit 2, there are seven source areas. These source areas were grouped together primarily because of the contaminants released and hence are not necessarily in geographical proximity. Source area ST10 includes a surface water body (Hardfill Lake) next to a fuel spill area. The primary constituents of concern for human health include benzene, toluene, ethylbenzene, and xylenes (BTEX). Monitored data showed these volatile constituents to be present in groundwater wells. The data also showed an elevated level of trace metals in groundwater.

  20. Operational safety experience reporting in the United States

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1978-01-01

    Licensees of nuclear power plants in the United States have many reporting requirements included in their technical specifications and the code of federal regulations, title 10. The Nuclear Regulatory Commisson receives these reports and utilizes them in its regulatory program. Part of this usage includes collecting and publishing this operating experience data in various reports and storing information in various data systems. This paper will discuss the data systems and reports on operating experience published and used by the NRC. In addition, some observations on operating experience will be made. Subjects included will be the Licensee Event Report (LER) Data File, the Operating Unit Status Report (Gray Book), Radiation Exposure Reports, Effluents Reports, the Nuclear Plant Reliability Data System, Current Events, Bulletin Wrapups and Annual Summaries. Some of the uses of the reports and systems will be discussed. The Abnormal Occurence Report to the US Congress will also be described and discussed. (author)

  1. Design and accomplishment for the monitoring unit of the sup 6 sup 0 Co train freight inspection system

    CERN Document Server

    Cong Peng

    2002-01-01

    The sup 6 sup 0 Co railway cargo inspection system has super automaticity. And the monitoring unit is an important part of the automatic control system. The author introduces the idea of designing the monitoring unit in detail and accomplishes a new-style unit which is different from the traditional one. The monitoring unit which is highly integrated, easy to be mounted and debugged and convenient to be operated and maintained has play an excellent role in the work of the whole inspection system

  2. Post-Closure Inspection Report for Corrective Action Unit 92: Area 6 Decon Pond Facility, Nevada Test Site, Nevada, for Calendar Year 2006

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility. CAU 92 was closed according to the ''Resource Conservation and Recovery Act'' (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection [NDEP], 1995) and the ''Federal Facility Agreement and Consent Order'' (FFACO) of 1996 (FFACO, 1996). Closure activities were completed on February 16, 1999, and the Closure Report (U.S. Department of Energy, Nevada Operations Office, 1999) was approved and a Notice of Completion issued by NDEP on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs), CAS 06-04-01, Decon Pad Oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02 requires post-closure inspections. Visual inspections of the cover and fencing at CAS 06-05-02 are performed quarterly. Additional inspections are conducted if precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in.]) in a 24-hour period. This report covers calendar year 2006. Quarterly site inspections were performed in March, June, September, and December of 2006. All observations indicated the continued integrity of the unit. No issues or concerns were noted, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A of this report, and photographs taken during the site inspections are included in Appendix B of this report. One additional inspection was performed after a precipitation event that exceeded 1.28 cm (0.50 in.) within a 24-hour period during 2006. No significant changes in site conditions were noted during this inspection, and no corrective actions were necessary. A copy of the inspection checklist and field notes completed during this additional inspection is included in Appendix A of this report. Precipitation records for 2006

  3. 21 CFR 120.6 - Sanitation standard operating procedures.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Sanitation standard operating procedures. 120.6... Provisions § 120.6 Sanitation standard operating procedures. (a) Sanitation controls. Each processor shall have and implement a sanitation standard operating procedure (SSOP) that addresses sanitation...

  4. Increasing the flexibility of base-load generating units in operation on fossil fuel

    Energy Technology Data Exchange (ETDEWEB)

    Girshfel' d, V Ya; Khanaev, V A; Volkova, E D; Gorelov, V A; Gershenkroi, M L

    1979-01-01

    Increasing the flexibility of base-load generating units operating on fossil fuel by modifying them is a necessary measure. The highest economic effect is attained with modification of gas- and oil-fired generating units in the Western United Power Systems of the European part of the SPSS. On the basis of available experience, 150- and 200-MW units can be extensively used to regulate the power in the European part of the SPSS through putting them into reserve for the hours of the load dip at night. The change under favorable conditions of 150- and 200-MW units operating on coal to a district-heating operating mode does not reduce the possibilities for flexible operation of these units because it is possible greatly to unload the turbines while the minimum load level of the pulverized fuel fired boiler is retained through transferring a part of the heat load to the desuperheater. It is necessary to accumulate and analyze experience with operation of generating units (especially of supercritical units) with regular shutdowns and starts of groups of units and to solve the problems of modification of generating units, with differentiation with respect to types of fuel and to the united power supply system.

  5. ER Operations Installation of Three FLUTe Soil-Vapor Monitoring Wells (MWL-SV03 MWL-SV04 and MWL-SV05) at the Mixed Waste Landfill.

    Energy Technology Data Exchange (ETDEWEB)

    Copland, John Robin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-09-01

    This installation report describes the May through July 2014 drilling activities performed for the installation of three multi-port soil-vapor monitoring wells (MWL-SV03, MWL-SV04, and MWL-SV05) at the Mixed Waste Landfill (MWL), which is located at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy (DOE)/National Nuclear Security Administration. The MWL is designated as Solid Waste Management Unit (SWMU) 76 and is located in Technical Area (TA) III (Figure 1-1). The locations of the three soil-vapor monitoring wells (MWL-SV03, MWL-SV04, and MWL-SV05) are shown in Figure 1-2

  6. 100-KR-1 Operable Unit focused feasibility study report

    International Nuclear Information System (INIS)

    1994-11-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Feasibility Study (FS) includes development and screening of alternatives and the detailed analysis of alternatives. This focused feasibility study (FFS) was conducted for the 100-KR-1 Operable Unit at the Hanford Site in southeastern Washington. The objective of this operable unit-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for the five sites (116-K-1 crib, 116-K-2 trench, 116-KE-4 and 116-KW-3 retention basins, and process effluent pipelines) associated with the 100-KR-1 Operable Unit. The IRM candidate waste sites are determined in the limited field investigation. Site profiles are developed for each of these waste site. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  7. 100 Area source operable unit focused feasibility study report. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    In accordance with the Hanford Past-Practice Strategy (HPPS), a focused feasibility study (FFS) is performed for those waste sites which have been identified as candidates for interim remedial measures (IRM) based on information contained in applicable work plans and limited field investigations (LFI). The FFS process for the 100 Area source operable units will be conducted in two stages. This report, hereafter referred to as the Process Document, documents the first stage of the process. In this stage, IRM alternatives are developed and analyzed on the basis of waste site groups associated with the 100 Area source operable units. The second stage, site-specific evaluation of the IRM alternatives presented in this Process Document, is documented in a series of operable unit-specific reports. The objective of the FFS (this Process Document and subsequent operable unit-specific reports) is to provide decision makers with sufficient information to allow appropriate and timely selection of IRM for sites associated with the 100 Area source operable units. Accordingly, the following information is presented: a presentation of remedial action objectives; a description of 100 Area waste site groups and associated group profiles; a description of IRM alternatives; and detailed and comparative analyses of the IRM alternatives

  8. Symptoms of Psychological Distress and Post-Traumatic Stress Disorder in United States Air Force Drone Operators

    Science.gov (United States)

    2014-08-01

    Disorder in United States Air Force “ Drone ” Operators 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S...referred to as “ drones .” Participants were assessed for self-reported sources of occupational stress, levels of clinical distress using the Outcome...providers are discussed. 15. SUBJECT TERMS Stress, drone operator, PTSD, USAF 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT

  9. 2014 Highlights of Ferry Operations in the United States

    Science.gov (United States)

    2016-05-01

    Based on information provided by operators who responded to the 2014 National Census of Ferry Operators (NCFO), the Bureau of Transportation Statistics (BTS) conservatively estimates that ferries in the United States carried just over 115 million pas...

  10. HDS unit revamp and operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Reinhardt, J. [Veba Oel Verarbeitungs-GmbH, Gelsenkirchen (Germany); Balfanz, U. [Aral Forschung, Gelsenkirchen (Germany); Dimmig, T. [TU Bergakademie Freiberg, Freiberg (Germany)

    2002-12-01

    Ruhr Oel GmbH, a joint venture between BP and PDVSA, operates a HDS unit at its Gelsenkirchen-Scholven site. The unit produces a major blend component for diesel fuel. Driven by ambitious German environmental policy and by an agreement between the German car and oil industries on the one hand and the government on the other, more stringent low sulphur fuel specifications will be enforced in Germany much earlier than in the rest of the European Union. In view of this situation a project was developed to fulfill the new product specifications with minimum investment. In a joint effort involving the refinery, the company research facilities and the catalyst supplier (AKZO NOBEL), pilot plant tests were performed to develop the best catalyst system and the new process conditions. Based on these results, an existing HDS unit was accordingly revamped. After the revamp, the unit produced diesel fuel with 50 ppm sulphur content and furthermore test runs at 10 ppm were carried out successfully. These results are displayed in this article. (orig.)

  11. Corrective action investigation plan for Corrective Action Unit Number 427: Area 3 septic waste system numbers 2 and 6, Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and the criteria for conducting site investigation activities at the Area 3 Compound, specifically Corrective Action Unit (CAU) Number 427, which is located at the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (140 miles) northwest of Las Vegas, Nevada. The Corrective Action Unit Work Plan, Tonopah Test Range, Nevada divides investigative activities at TTR into Source Groups. The Septic Tanks and Lagoons Group consists of seven CAUs. Corrective Action Unit Number 427 is one of three septic waste system CAUs in TTR Area 3. Corrective Action Unit Numbers 405 and 428 will be investigated at a future data. Corrective Action Unit Number 427 is comprised of Septic Waste Systems Number 2 and 6 with respective CAS Numbers 03-05-002-SW02 and 03-05-002-SW06

  12. Structural study of the semimagnetic semiconductor Zn{sub 0.5}Mn{sub 0.5}In{sub 2}Te{sub 4}

    Energy Technology Data Exchange (ETDEWEB)

    Delgado, G.E. [Laboratorio de Cristalografia, Departamento de Quimica, Facultad de Ciencias, Universidad de Los Andes, Merida (Venezuela); Sagredo, V. [Laboratorio de Magnetismo en Solidos, Departamento de Quimica, Facultad de Ciencias, Universidad de Los Andes, Merida (Venezuela)

    2009-02-15

    The semimagnetic semiconductor alloy Zn{sub 0.5}Mn{sub 0.5}In{sub 2}Te{sub 4} was refined from an X-ray powder diffraction pattern using the Rietveld method. This compound crystallizes in the space group I anti 42m (N {sup circle} 121), Z=2, with unit cell parameters a=6.1738(1)A, c=12.3572(4)A, V=471.00(2)A3, c/a=2.00. This material crystallizes in a stannite-type structure. (copyright 2009 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim) (orig.)

  13. Nuclear design report for Ulchin nuclear power plant unit 1, cycle 6

    Energy Technology Data Exchange (ETDEWEB)

    Zee, Sung Kyun; Kim, Yong Rae; Park, Yong Soo; Cho, Byeong Ho; Lee, Sang Keun; Ahn, Dawk Hwan [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    This report presents nuclear design calculations for cycle 6 of Ulchin unit 1. Information is given on fuel loading, power density distributions, reactivity coefficients, control rod worths and operational limits. In addition, the report contains all necessary data for the startup tests including predicted values for the comparison with the measured data. The reload consists of 64 KOFA`s enriched by nominally 3.70 w/o U{sub 235}. Among the KOFA`s, 32 fuel assemblies contain gadolinia rods. The fuel assemblies in the core are arranged in a low leakage loading pattern. The cycle length of cycle 6 amounts to 369 EFPD corresponding to a cycle burnup of 14850 MWD/MTU. (Author) 8 refs., 55 figs., 17 tabs.

  14. Nuclear design report for Ulchin nuclear power plant unit 2, cycle 6

    Energy Technology Data Exchange (ETDEWEB)

    Park, Chan Oh; Park, Jin Ha; Kim, Yong Rae; Park, Sang Yoon; Lee, Jong Chul; Baik, Joo Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-08-01

    This report presents nuclear design calculations for cycle 6 of Ulchin unit 2. Information is given on fuel loading, power density distributions, reactivity coefficients, control rod worths and operational limits. In addition, the report contains all necessary data for the startup tests including predicted values for the comparison with the measured data. The reload consists of 64 KOFA`s enriched by nominally 3.80 w/o U{sub 235}. Among the KOFA`s, 36 fuel assemblies contain gadolinia rods. The fuel assemblies in the core are arranged in a low leakage loading pattern. The cycle length of cycle 6 amounts to 388 EFPD corresponding to a cycle burnup of 15610 MWD/MTU. (Author) 8 refs., 55 figs., 17 tabs.

  15. Synthesis and study of NH4[HSiUO60.5H2O

    International Nuclear Information System (INIS)

    Chernorukov, N.G.; Kortikov, V.E.

    2000-01-01

    Previously unknown ammonium uranosilicate of NH 4 [HSiUO 60.5H 2 O composition is synthesised by precipitation from aqueous solution containing ammonium chloride, uranyl nitrate and quartz glass with the size of granules ≤ 2. On evidence of X-ray diffraction ammonium uranosilicate is a full crystallographic analog of proper lithium and potassium derivatives with approaching parameters of crystal lattices: a= 7.01(2), b=7.03(8), c=6.65(9) A, β=105.6(0) Deg. Functional composition and peculiarity of ammonium uranosilicate structure are detected by IR spectroscopic study. Scheme of thermal decomposition of ammonium uranosilicate is demonstrated based on thermal gravimetric and X-ray diffraction measurements. NH 4 [HSiUO 60.5H 2 O is among of morphotropic raw of A 1/k k HSiUO 6 ·nH 2 O [ru

  16. Evaluation of potential severe accidents during low power and shutdown operations at Surry: Unit 1, Volume 1

    International Nuclear Information System (INIS)

    Chu, T.L.; Pratt, W.T.

    1995-10-01

    This document contains a summarization of the results and insights from the Level 1 accident sequence analyses of internally initiated events, internally initiated fire and flood events, seismically initiated events, and the Level 2/3 risk analysis of internally initiated events (excluding fire and flood) for Surry, Unit 1. The analysis was confined to mid-loop operation, which can occur during three plant operational states (identified as POSs R6 and R10 during a refueling outage, and POS D6 during drained maintenance). The report summarizes the Level 1 information contained in Volumes 2--5 and the Level 2/3 information contained in Volume 6 of NUREG/CR-6144

  17. Evaluation of potential severe accidents during low power and shutdown operations at Surry: Unit 1, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Pratt, W.T. [eds.; Musicki, Z. [Brookhaven National Lab., Upton, NY (United States)

    1995-10-01

    This document contains a summarization of the results and insights from the Level 1 accident sequence analyses of internally initiated events, internally initiated fire and flood events, seismically initiated events, and the Level 2/3 risk analysis of internally initiated events (excluding fire and flood) for Surry, Unit 1. The analysis was confined to mid-loop operation, which can occur during three plant operational states (identified as POSs R6 and R10 during a refueling outage, and POS D6 during drained maintenance). The report summarizes the Level 1 information contained in Volumes 2--5 and the Level 2/3 information contained in Volume 6 of NUREG/CR-6144.

  18. Licensed operating reactors: status summary report, data as of 6-30-81

    International Nuclear Information System (INIS)

    1981-07-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Management and Program Analysis from the Headquarters staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, IE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the U.S. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the U.S. energy situation as a whole

  19. Scale-up of a mixer-settler extractor using a unit operations approach

    International Nuclear Information System (INIS)

    Lindholm, D.C.; Bautista, R.G.

    1976-01-01

    The results of scale-up studies on a continuous, multistage horizontal mixer-settler extractor are presented. The chemical and mechanical system involves the separation of lanthanum from a mixture of rare earth chlorides using di(2-ethylhexyl) phosphoric acid as the solvent and dilute HCl as a scrub solution in a bench scale extractor. Each stage has a hold-up of 2.6 l. A single stage unit is utilized for scale-up studies. Results are obtained on four sizes of geometrically similar units, the largest being six times the volume of the original bench size. A unit operations technique is chosen so that mixing and settling can be examined independently. Variables examined include type of continuous phase, flow rate of inlet streams, and power input to the mixer. Inlet flow-rate ratios are kept constant for all tests. Two potential methods of unbaffled pump-mixer scale-up are explored; the maintenance of constant impeller tip speed and constant power input. For the settler, the previously successful method of basing design on constant flow-rate per unit cross-sectional area is used

  20. High-pressure synthesis and magnetic behavior of A-site columnar-ordered double perovskites, LnMn(Ga{sub 0.5}Ti{sub 0.5}){sub 2}O{sub 6} (Ln = Sm, Gd)

    Energy Technology Data Exchange (ETDEWEB)

    Shimura, Gen; Niwa, Ken; Shirako, Yuichi; Hasegawa, Masashi [Department of Crystalline Materials Science, Nagoya University, 464-8601, Nagoya (Japan)

    2017-01-26

    A-site columnar-ordered double perovskites, LnMn(Ga{sub 0.5}Ti{sub 0.5}){sub 2}O{sub 6} (Ln = Sm, Gd), were successfully synthesized under high pressure and high temperature (6 GPa, 1375 K). From the synchrotron powder X-ray diffraction patterns, all of the diffraction peaks can be indexed by the P4{sub 2}/nmc space group with lattice parameters a, c ∼ 2a{sub p} (a{sub p}: primitive cubic perovskite lattice) and no ordering of the B-site cations. Rietveld analysis of the synchrotron powder X-ray diffraction patterns and Curie-Weiss fitting of their magnetizations reveal that the ionic formulae of these perovskites are Ln{sup 3+}Mn{sup 2+}(Ga{sup 3+}{sub 0.5}Ti{sup 4+}{sub 0.5}){sub 2}O{sup 2-}{sub 6}. SmMn(Ga{sub 0.5}Ti{sub 0.5}){sub 2}O{sub 6} shows canted-antiferromagnetic behavior, whereas GdMn(Ga{sub 0.5}Ti{sub 0.5}){sub 2}O{sub 6} exhibits two different magnetic states at low temperature depending on the applied magnetic field and shows an unusual magnetization curve. These magnetic behaviors originate by decreasing the antiferromagnetic interaction by substituting Ga{sup 3+}(d{sup 10}) for Ti{sup 4+}(d{sup 0}) and by decreasing the ferromagnetic interaction between columnar-ordered Ln{sup 3+} and Mn{sup 2+}. (copyright 2017 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  1. Phase 1 remedial investigation report for 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit

  2. Phase formation, structure and dielectric properties of ceramics (Na0.5Bi0.5TiO3–(K0.5Na0.5NbO3–BiFeO3

    Directory of Open Access Journals (Sweden)

    G. M. Kaleva

    2016-03-01

    Full Text Available Influence of BiFeO3 (BF on phase formation, unit cell parameters, microstructure, dielectric and ferroelectric properties of solid solutions close to the morphotropic phase boundary in the (Na0.5Bi0.5TiO3–(K0.5Na0.5NbO3 system additionally modified by the low-melting KCl additives has been studied. The formation of pure perovskite structure samples decrease in the unit cell parameters and increase in the TC value stimulated by the BF addition have been revealed. It was proved that modification of compositions by small amounts of the BF and KCl additives leads to improvement of dielectric parameters.

  3. Safety evaluation report related to the operation of Susquehanna Steam Electric Station, Units 1 and 2 (Docket Nos. 50-387 and 50-388). Suppl.6

    International Nuclear Information System (INIS)

    1984-03-01

    In April 1981, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0776) regarding the application of the Pennsylvania Power and Light Company (the applicant and/or licensee) and the Allegheny Electric Cooperative, Inc. (co-applicant) for licenses to operate the Susquehanna Steam Electric Station, Units 1 and 2, located on a site in Luzerne County, Pennsylvania. This supplement to NUREG-0776 addresses the remaining issues that required resolution before licensing operation of Unit 2 and closes them out

  4. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353)

    International Nuclear Information System (INIS)

    1989-06-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 to NUREG-0991 was issued in December 1983. Supplements 2 and 3 were issued in October 1984. License NPF-27 for the low-power operation of Limerick Unit 1 was issued on October 26, 1984. Supplement 4 was issued in May, 1985, Supplement 5 was issued in July 1985, and Supplement 6 was issued in August 1985. These supplements addressed further issues that required resolution before Unit 1 proceeded beyond the 5-percent power level. The full-power operating license for Limerick Unit 1 (NPF-39) was issued August 8, 1985, and the unit has completed two cycles of operation. Supplement 7 was issued April 1989 to address some of the few significant design differences between Units 1 and 2, the resolution of issues that remained open when the Unit 1 full-power license was issued and an assessment of some of the issues that required resolution before issuance of an operating license for Unit 2. This supplement addresses the remaining issues that required resolution before issuance of and operating license for Unit 2

  5. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  6. Application of an automated patrol-type monitoring system in the reinforced concrete containment vessel at Kashiwazaki-Kariwa Nuclear Power Plant Units 6 and 7

    International Nuclear Information System (INIS)

    Kimoto, T.; Senoh, M.; Hirakawa, H.; Tanaka, K.; Takahashi, M.

    1996-01-01

    An automated patrol-type monitoring system was applied to the first Advanced Boiling Water Reactor (ABWR) plants in the world, Kashiwazaki-Kariwa Nuclear Power Plant Units 6 and 7. The system consists of two robots traveling along monorail and several ITV systems. This monitoring system is used to watch the operating incident of key components of ABWR, such as water leakage from packing in Fine Motion Control Rod Drive (FM-CRD), Reactor Internal Pump (RIP) etc. which are located in the reinforced concrete containment and usually could not be accessible under operation. The traveling robots are equipped with the three kinds of sensors, an infrared camera, a color TV camera and a microphone, and have a capability to inspect the pre-determined inspection points guided by the monorail. This monitoring system is automatically turned on to start inspection at a scheduled time. For Units 6 and 7, this monitoring system, two robots and several ITV systems, can be controlled from one common control desk and one handy-type remote control panel. Since this monitoring system was installed at Kashiwazaki-Kariwa Nuclear Power Plant Units 6 and 7, this system has been operating successfully. (The installation and testing of the system for Unit 6 was finished completely and the testing the system for Unit 7 has been carrying out.) (author)

  7. Synthesis, structure and electrochemical properties of LiNaCo{sub 0.5}Fe{sub 0.5}PO{sub 4}F fluoride-phosphate

    Energy Technology Data Exchange (ETDEWEB)

    Fedotov, Stanislav S. [Department of Chemistry, Lomonosov Moscow State University, 119991 Moscow (Russian Federation); Skoltech Center for Electrochemical Energy Storage, Skolkovo Institute of Science and Technology, 143026 Moscow (Russian Federation); Kuzovchikov, Sergey M.; Khasanova, Nellie R.; Drozhzhin, Oleg A.; Filimonov, Dmitriy S. [Department of Chemistry, Lomonosov Moscow State University, 119991 Moscow (Russian Federation); Karakulina, Olesia M.; Hadermann, Joke [EMAT, University of Antwerp, Groenenborgerlaan 171, B-2020 Antwerp (Belgium); Abakumov, Artem M. [Department of Chemistry, Lomonosov Moscow State University, 119991 Moscow (Russian Federation); Skoltech Center for Electrochemical Energy Storage, Skolkovo Institute of Science and Technology, 143026 Moscow (Russian Federation); EMAT, University of Antwerp, Groenenborgerlaan 171, B-2020 Antwerp (Belgium); Antipov, Evgeny V. [Department of Chemistry, Lomonosov Moscow State University, 119991 Moscow (Russian Federation)

    2016-10-15

    LiNaCo{sub 0.5}Fe{sub 0.5}PO{sub 4}F fluoride-phosphate was synthesized via conventional solid-state and novel freeze-drying routes. The crystal structure was refined based on neutron powder diffraction (NPD) data and validated by electron diffraction (ED) and high-resolution transmission electron microscopy (HRTEM). The alkali ions are ordered in LiNaCo{sub 0.5}Fe{sub 0.5}PO{sub 4}F and the transition metals jointly occupy the same crystallographic sites. The oxidation state and oxygen coordination environment of the Fe atoms were verified by {sup 57}Fe Mössbauer spectroscopy. Electrochemical tests of the LiNaCo{sub 0.5}Fe{sub 0.5}PO{sub 4}F cathode material demonstrated a reversible activity of the Fe{sup 3+}/Fe{sup 2+} redox couple at the electrode potential near 3.4 V and minor activity of the Co{sup 3+}/Co{sup 2+} redox couple over 5 V vs Li/Li{sup +}. The material exhibited the discharge capacity of more than 82% (theo.) regarding Fe{sup 3+}/Fe{sup 2+} in the 2.4÷4.6 V vs Li/Li{sup +} potential range. - Graphical abstract: The ball-polyhedral representation of the LiNaCo{sub 0.5}Fe{sub 0.5}PO{sub 4}F crystal structure. The MO{sub 4}F{sub 2} units are depicted as blue octahedra, PO{sub 4} units as orange tetrahedra, sodium atoms are designated as yellow (Na1), lithium – red and brown (Li2, Li3 resp.), fluorine – green, oxygen – violet spheres. - Highlights: • Freeze-drying method was successfully applied to the synthesis of LiNaCo{sub 0.5}Fe{sub 0.5}PO{sub 4}F. • The crystal structure of LiNaCo{sub 0.5}Fe{sub 0.5}PO{sub 4}F was refined based on NPD and validated by ED and HRTEM. • LiNaCo{sub 0.5}Fe{sub 0.5}PO{sub 4}F demonstrated a reversible Li de/intercalation in the 2.5÷4.6 V vs Li/Li{sup +} range.

  8. Technical and economic feasibility for the application of micronized coal as a replacement for No. 2 oil for start-up and low-load operation at Illinois Power Havana No. 6 Cycling Unit

    International Nuclear Information System (INIS)

    Rosenberger, F.; Guilfoyle, C.J.; Parker, W.O. Jr.

    1991-01-01

    Uncertainty regarding oil availability and long-term price stability make it difficult for a utility to predict annual ignition costs for a cycling unit. Illinois Power Company, Sargent and Lundy Engineering and Micro-fuel Corporation have produced a detailed feasibility study on the application of micronized coal as a replacement fuel for start-up and low-load operation for Havana No. 6. This unit is a B and W opposed-fired boiler which is rated at 410 MWe (summer net). This paper presents technical and economic analysis, including the uncertainties of the application of this technology

  9. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy`s (DOE`s) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.

  10. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    International Nuclear Information System (INIS)

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy's (DOE's) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement

  11. Oxygen permeation and stability of La 0.4Ca 0.6Fe 1-xCo xO 3-δ ( x = 0, 0.25, 0.5) membranes

    Science.gov (United States)

    Diethelm, S.; Van herle, J.; Middleton, P. H.; Favrat, D.

    Three perovskite-type compounds of composition La 0.4Ca 0.6Fe 1- xCo xO 3- δ ( x=0, 0.25 and 0.5) were investigated for use as oxygen separation membranes for the partial oxidation (POX) of methane to syngas. Special attention was given to the question of their stability in real operating conditions. A permeation set-up was specially designed to measure oxygen fluxes through these materials when placed in a strong pO 2 gradient. It also facilitated testing the long-term stability of the specimen. Permeation measurements performed in an air/argon gradient between 800 and 1000 °C showed that the highest fluxes were obtained with the highest content of cobalt (La 0.4Ca 0.6Fe 0.5Co 0.5O 3- δ ≅ La 0.4Ca 0.6Fe 0.75Co 0.25O 3- δ > La 0.4Ca 0.6FeO 3- δ). In addition, comparison between the fluxes of samples of different thickness gave clear evidence of surface limitations in the oxygen transport. The long-term stability test showed opposite trends: only the two lowest Co containing compounds ( x=0 and 0.25) sustained an air/(Ar+H 2) gradient over more than 600 h. The other ( x=0.5) broke shortly after the introduction of H 2. In the presence of H 2, the oxygen flux was increased by a factor 10 compared to Ar and reached 0.83 μmol/cm 2 s for La 0.4Ca 0.6Fe 0.75Co 0.25O 3- δ at 900 °C. Post-operation SEM examination of the cross-section and both surfaces revealed that the surface exposed to H 2 had started to decompose resulting in the formation of a thin porous layer but the bulk of the material remained unchanged.

  12. Synthesis and characterization of the novel rare earth orthophosphates Y0.5Er0.5PO4 and Y0.5Yb0.5PO4

    International Nuclear Information System (INIS)

    Schildhammer, Daniel; Petschnig, Lucas L.; Fuhrmann, Gerda; Heymann, Gunter; Schottenberger, Herwig; Huppertz, Hubert; Tribus, Martina

    2016-01-01

    The new mixed rare earth (RE) orthophosphates Y 0.5 Er 0.5 PO 4 and Y 0.5 Yb 0.5 PO 4 were synthesized by a classical solid state reaction in an electrical furnace at 1200 C. As starting materials, the corresponding rare earth oxides and diammonium hydrogen phosphate were used. The powder diffraction analyses revealed that the new compounds Y 0.5 Er 0.5 PO 4 and Y 0.5 Yb 0.5 PO 4 crystallize in a zircon-type structure being isostructural with the rare earth orthophosphate YPO 4 . Y 0.5 Er 0.5 PO 4 and Y 0.5 Yb 0.5 PO 4 crystallize in the tetragonal space group I4 1 /amd (no. 141) with four formula units in the unit cell. The structural parameters based on Rietveld refinements are a = 687.27(2), c = 601.50(2) pm, V = 0.28412(1) nm 3 , R p = 0.0143, and R wp = 0.0186 (all data) for Y 0.5 Er 0.5 PO 4 and a = 684.61(2), c = 599.31(2) pm, V = 0.28089(2) nm 3 , R p = 0.0242, and R wp = 0.0313 (all data) for Y 0.5 Yb 0.5 PO 4 . Furthermore, the structure of Y 0.5 Er 0.5 PO 4 was refined from single-crystal X-ray diffraction data: a = 687.78(5), c = 601.85(4) pm, V = 0.28470(5) nm 3 , R 1 = 0.0165, and wR 2 = 0.0385 (all data). In both compounds, the rare earth metal ions are eightfold coordinated by oxygen atoms, forming two unique interlocking tetrahedra with two individual RE-O distances. The tetrahedral phosphate groups [PO 4 ] 3- are slightly distorted in both compounds. The individual rare earth ions share a common position (Wyckoff site 4a). The presence of two rare earth ions in the structures of the new orthophosphates Y 0.5 Er 0.5 PO 4 and Y 0.5 Yb 0.5 PO 4 was additionally confirmed by single-crystal EDX spectroscopy revealing a ratio of 1:1.

  13. Preparation status for continuous operation of Kori unit 1 NPP in Korea

    International Nuclear Information System (INIS)

    Choi, C.H. . E-mail : chechee@khnp.co.kr

    2005-01-01

    Kori unit 1 Nuclear Power Plant is the first commercial operation plant in Korea. In Korea, the life extension of NPP beyond design lifetime reached practically application stage. Preparations status for continuous operation of Kori unit 1, Many researches have demonstrated that life extension beyond design lifetime is possible in terms of technology. This paper is to introduce and to share the continuous operation preparations status and schedule for Kori unit 1 License Renewal Process an additional every 10 years beyond the design life 30 years term. (author)

  14. Application of Digital Technology for the Plant Protection System in Ulchin Nuclear Power Plant Units 5 and 6

    International Nuclear Information System (INIS)

    Deucksoo, Lee; Insik, Kim

    2006-01-01

    Since the completion of construction of Ulchin Nuclear Power Plant Units 3 and 4 (UCN 3 and 4), the first units of the OPR (Optimized Power Reactor) series, various advanced design features have been incorporated to the following OPRs. The Ulchin Nuclear Power Plant Units 5 and 6(UCN 5 and 6) which started commercial operation in Korea from 2004 and 2005 respectively, are designed to provide improvements in safety, reliability and costs by applying both advanced proven technology and experiences gained from the construction and operation of the previous OPRs. Among those improvements, the digital plant protection system (DPPS) and the digital engineered safety feature actuation system (DESFAS) are the key elements to the UCN 5 and 6 designs. The DPPS and DESFAS utilizing the digital computer technology offer a solution to the obsolescence problem of analog system. These features also provide the potential for additional benefits such as ease of maintenance, increased performance, reduction of internal and external cross channel wiring, improvement of the surveillance testability and flexibility of control logic programming change. During the initial design stage, the Korean regulatory body had evaluated these design concepts intensively and concluded it to be acceptable for the safety point of view. Also, in-depth review on the detailed design and the special evaluation/audit for the software design process has been performed to secure the quality of the software. As a result, every issue raised during licensing review has been clarified and the operating licenses for the UCN 5 and 6 were issued in October, 2003 and October, 2004 respectively, by the government. In this paper, design characteristics of the UCN 5 and 6 are introduced, and advanced design features and implementation process are presented focused on the DPPS/DESFAS with some benefit analysis results. (authors)

  15. Biblis 1,300 MW unit B in operation for thirty years

    International Nuclear Information System (INIS)

    Lauer, H.

    2006-01-01

    Over the past thirty years, unit B of the Biblis nuclear power station has contributed towards safe, reliable and non-polluting electricity generation. Unit B was the first 1,300 MW unit in the world confirming the good experience accumulated in the construction and operation of plants this size. It laid the foundation for the advanced development of nuclear power plants up to the convoy line. The good availability this plant has achieved in its operating cycles proves the mature state of technology and the high level of qualification and motivation of the power plant staff and the personnel of external firms contracted to work for Biblis. Biblis B has served as a reference plant in German nuclear safety research, demonstrating that units this size can be operated safely. Unit B is also living proof of the possibility to raise nuclear power plants built in the seventies to the current state of the art by implementing the appropriate backfitting and modernization measures. Today, Biblis B is operated at a safety level clearly higher than that to be achieved for new plants internationally. This is also evident from comparison with the guiding values for the safety of new facilities as published by the International Atomic Energy Agency (IAEA). (orig.)

  16. Expert system for operational personnel support during power unit operation control in regulation range

    International Nuclear Information System (INIS)

    Yanitskij, V.A.

    1992-01-01

    The problems met when developing the systems for NPP operator support in the process of power unit operation are considered. The expert system for NPP personnel intelligent support combining the properties belonging to the artificial intelligence systems including selection of the analysis method taking into account the concrete technological situation and capability of application of algothmic calculations of the equipment characteristics using the information accumulated during the system development, erection and operation is described

  17. Visualization of the Diffusion Pathway of Protons in (NH4)2Si0.5Ti0.5P4O13 as an Electrolyte for Intermediate-Temperature Fuel Cells.

    Science.gov (United States)

    Sun, Chunwen; Chen, Lanli; Shi, Siqi; Reeb, Berthold; López, Carlos Alberto; Alonso, José Antonio; Stimming, Ulrich

    2018-01-16

    We demonstrate that (NH 4 ) 2 Si 0.5 Ti 0.5 P 4 O 13 is an excellent proton conductor. The crystallographic information concerning the hydrogen positions is unraveled from neutron-powder-diffraction (NPD) data for the first time. This study shows that all the hydrogen atoms are connected though H bonds, establishing a two-dimensional path between the [(Si 0.5 Ti 0.5 )P 4 O 13 2- ] n layers for proton diffusion across the crystal structure by breaking and reconstructing intermediate H-O═P bonds. This transient species probably reduces the potential energy of the H jump from an ammonium unit to the next neighboring NH 4 + unit. Both theoretical and experimental results support an interstitial-proton-conduction mechanism. The proton conductivities of (NH 4 ) 2 Si 0.5 Ti 0.5 P 4 O 13 reach 0.0061 and 0.024 S cm -1 in humid air at 125 and 250 °C, respectively. This finding demonstrates that (NH 4 ) 2 Si 0.5 Ti 0.5 P 4 O 13 is a promising electrolyte material operating at 150-250 °C. This work opens up a new avenue for designing and fabricating high-performance inorganic electrolytes.

  18. Global and local structural variations near the antiferroelectric regime in Na{sub 0.5}Bi{sub 0.5}TiO{sub 3}

    Energy Technology Data Exchange (ETDEWEB)

    Thangavelu, Karthik [Advanced Functional Materials Laboratory, Department of Physics, Indian Institute of Technology Hyderabad, ODF-Campus-502205 (India); Department of Materials Science and Metallurgical Engineering, Indian Institute of Technology Hyderabad, ODF-Campus-502205 (India); Rayaprol, S. [UGC-DAE CSR Mumbai Centre, BARC Campus, Mumbai - 400085 (India); Siruguri, V. [Solid State Physics Division, Bhabha Atomic Research Centre, Mumbai - 400085 (India); Sastry, P. U.; Asthana, Saket, E-mail: asthanas@iith.ac.in

    2015-06-24

    Rietveld refinement of neutron and x-ray diffraction data of Na{sub 0.5}Bi{sub 0.5}TiO{sub 3} shows R3c phase stabilization at room temperature. The intermediate antiferroelectric region between 180°C to 280°C exhibits phase coexistence i.e R3c + Pnma, along with decrease in octahedral tilt angle and increase in unit cell volume. The local structural changes observed from Raman scattering in the A-O, Ti-O and TiO{sub 6} phonon modes favor the global structural variation. A possible antiparallel cation displacement due to Pnma phase formation leads to the origin of antiferroelectric ordering in Na{sub 0.5}Bi{sub 0.5}TiO{sub 3}.

  19. Hanford Site waste management units report

    International Nuclear Information System (INIS)

    1993-04-01

    The Hanford Site Waste Management Units Report was originated to provide information responsive to Section 3004(u) of the Hazardous and Solid Waste Amendments of the 1984. This report provides a comprehensive inventory of all types of waste management units at the Hanford Site, including a description of the units and the waste they contain. Waste management units in the report include: (1) Resource Conservation and Recovery Act of 1976 (RCRA) disposal units, (2) Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) disposal units, (3) unplanned releases, (4) inactive contaminated structures, (5) RCRA treatment, storage, and disposal (TSD) units, and (6) other storage areas. Because of the comprehensive nature of the units report, the list of units is more extensive than required by Section 3004(u) of Hazardous and Solid Waste Amendments of the 1984. In Sections 3.0 through 6.0 of this report, the four aggregate areas are subdivided into their operable units. The operable units are further divided into two parts: (1) those waste management units assigned to the operable unit that will be remediated as part of the Environmental Restoration Remedial Actions (ERRA) Program, and (2) those waste management units located within the operable unit boundaries but not assigned to the ERRA program. Only some operable unit sections contain the second part.Volume two contains Sections 4.0 through 6.0 and the following appendices: Appendix A -- acronyms and definition of terms; Appendix B -- unplanned releases that are not considered to be units; and Appendix C -- operable unit maps

  20. Stability Analysis for Operation of DG Units in Smart Grids

    DEFF Research Database (Denmark)

    Pouresmaeil, Edris; Shaker, Hamid Reza; Mehrasa, Majid

    2015-01-01

    This paper presents a multifunction control strategy for the stable operation of Distributed Generation (DG) units during grid integration. The proposed control model is based on Direct Lyapunov Control (DLC) theory and provides a stable region for the appropriate operation of DG units during grid....... Application of this concept can guarantee to reduce the stress on the grid during the energy demand peak. Simulation results are presented to demonstrate the proficiency and performance of the proposed DLC technique in DG technology....

  1. Implementation of Active Learning Method in Unit Operations II Subject

    OpenAIRE

    Ma'mun, Sholeh

    2018-01-01

    ABSTRACT: Active Learning Method which requires students to take an active role in the process of learning in the classroom has been applied in Department of Chemical Engineering, Faculty of Industrial Technology, Islamic University of Indonesia for Unit Operations II subject in the Even Semester of Academic Year 2015/2016. The purpose of implementation of the learning method is to assist students in achieving competencies associated with the Unit Operations II subject and to help in creating...

  2. Decommissioning strategy of the operating WWER type units in the Ukraine

    International Nuclear Information System (INIS)

    Litvinsky, L.L.; Lobach, Yu.N.; Skripov, A.E.

    2002-01-01

    At present in Ukraine, 13 WWER type units are in operation and two other ones are in the final stage of construction. Decommissioning of these units is expected after the year 2010. General planning of their decommissioning is developed in the framework of the decommissioning strategy of operating WWER type units. The strategy contains the objectives, principles and main tasks of the decommissioning as well as the activities at each phase of decommissioning. It is considered a broad range of factors important for the planning and implementation of decommissioning. (author)

  3. Effect of Al2O3 on the sintering of garnet-type Li6.5La3Zr1.5Ta0.5O12

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Yuxing; Yan, Pengfei; Xiao, Jie; Lu, Xiaochuan; Zhang, Ji-Guang; Sprenkle, Vincent L.

    2016-10-01

    It is widely recognized that Al plays a dual role in the fabrication of garnet-type solid electrolytes, i.e., as a dopant that stabilizes the cubic structure and a sintering aid that facilitates the densification. However, the sintering effect of Al2O3 has not been well understood so far because Al is typically “unintentionally” introduced into the sample from the crucible during the fabrication process. In this study, we have investigated the sintering effect of Al on the phase composition, microstructure, and ionic conductivity of Li6.5La3Zr1.5Ta0.5O12 by using an Al-free crucible and intentionally adding various amounts of γ-Al2O3. It was found that the densification of Li6.5La3Zr1.5Ta0.5O12 occurred via liquid-phase sintering, with evidence of morphology change among different compositions. Among all of the compositions, samples with 0.05 mol of Al per unit formula of garnet oxide (i.e., 0.3 wt% Al2O3) exhibited the optimal microstructure and the highest total ionic conductivity of 5 10-4 S cm-1 at room temperature.

  4. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  5. Preparing nuclear power plant units for operation

    International Nuclear Information System (INIS)

    Hudcovic, R.; Telgarsky, K.; Kmosena, J.

    1984-01-01

    The factors are listed which have to be taken into consideration for planning the unit operation, i.e., the implementation of planned repairs, checks of equipment and refuellings. All basic input data were evaluated as the basic for drawing up the schedule of routine repairs and overhauls for the coming period. (E.S.)

  6. Nurse managers' decision-making in daily unit operation in peri-operative settings: a cross-sectional descriptive study.

    Science.gov (United States)

    Siirala, Eriikka; Peltonen, Laura-Maria; Lundgrén-Laine, Heljä; Salanterä, Sanna; Junttila, Kristiina

    2016-09-01

    To describe the tactical and the operational decisions made by nurse managers when managing the daily unit operation in peri-operative settings. Management is challenging as situations change rapidly and decisions are constantly made. Understanding decision-making in this complex environment helps to develop decision support systems to support nurse managers' operative and tactical decision-making. Descriptive cross-sectional design. Data were collected from 20 nurse managers with the think-aloud method during the busiest working hours and analysed using thematic content analysis. Nurse managers made over 700 decisions; either ad hoc (n = 289), near future (n = 268) or long-term (n = 187) by nature. Decisions were often made simultaneously with many interruptions. Ad hoc decisions covered staff allocation, ensuring adequate staff, rescheduling surgical procedures, confirmation tangible resources and following-up the daily unit operation. Decisions in the near future were: planning of surgical procedures and tangible resources, and planning staff allocation. Long-term decisions were: human recourses, nursing development, supplies and equipment, and finances in the unit. Decision-making was vulnerable to interruptions, which sometimes complicated the managing tasks. The results can be used when planning decision support systems and when defining the nurse managers' tasks in peri-operative settings. © 2016 John Wiley & Sons Ltd.

  7. Proposed plan for the 100-IU-1, 100-IU-3, 100-IU-4, AND 100-IU-5 Operable Units

    International Nuclear Information System (INIS)

    1995-06-01

    This proposed plan identifies the preferred alternative for the Riverland Rad Yard, the Wahluke Slope, the Sodium Dichromate Baffel Landfill, and the, White Bluffs Pickling Acid Cribs, located at the Hanford Site. These areas are known respectively as the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. Between 1992 and 1994, each of the four operable units was the subject of an expedited response action that addressed removal of site contaminants in soil. Waste sites in the 100-IU-2 (White Bluffs Townsite) and 100-IU-6 (Hanford Townsite) Operable Units will be addressed in future proposed plans. A proposed plan is intended to be a fact sheet for public review that summarizes the information relied upon to recommend the preferred alternative. As presented in this proposed plan, no further action is the preferred alternative for the final resolution of the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. The preferred alternative is recommended because all suspect hazardous substances above cleanup levels have been removed from the waste sites, and the sites are unlikely to pose any significant risk to human health or the environment

  8. Prospects and requirements for an operational modelling unit in flood crisis situations

    Directory of Open Access Journals (Sweden)

    Anders Katharina

    2016-01-01

    Full Text Available Dike failure events pose severe flood crisis situations on areas in the hinterland of dikes. In recent decades the importance of being prepared for dike breaches has been increasingly recognized. However, the pre-assessment of inundation resulting from dike breaches is possible only based on scenarios, which might not reflect the situation of a real event. This paper presents a setup and workflow that allows to model dike breachinduced inundation operationally, i.e. when an event is imminent or occurring. A comprehensive system setup of an operational modelling unit has been developed and implemented in the frame of a federal project in Saxony-Anhalt, Germany. The modelling unit setup comprises a powerful methodology of flood modelling and elaborated operational guidelines for crisis situations. Nevertheless, it is of fundamental importance that the modelling unit is instated prior to flood events as a permanent system. Moreover the unit needs to be fully integrated in flood crisis management. If these crucial requirements are met, a modelling unit is capable of fundamentally supporting flood management with operational prognoses of adequate quality even in the limited timeframe of crisis situations.

  9. 77 FR 62247 - Dynamic Positioning Operations Guidance for Vessels Other Than Mobile Offshore Drilling Units...

    Science.gov (United States)

    2012-10-12

    ... Operations Guidance for Vessels Other Than Mobile Offshore Drilling Units Operating on the U.S. Outer... ``Mobile Offshore Drilling Unit Dynamic Positioning Guidance''. The notice recommended owners and operators of Mobile Offshore Drilling Units (MODUs) follow Marine Technology Society (MTS) Dynamic Positioning...

  10. Thunderstorm Algorithm for Determining Unit Commitment in Power System Operation

    Directory of Open Access Journals (Sweden)

    Arif Nur Afandi

    2016-12-01

    Full Text Available Solving the unit commitment problem is an important task in power system operation for deciding a balanced power production between various types of generating units under technical constraints and environmental limitations. This paper presents a new intelligent computation method, called the Thunderstorm Algorithm (TA, for searching the optimal solution of the integrated economic and emission dispatch (IEED problem as the operational assessment for determining unit commitment. A simulation using the IEEE-62 bus system showed that TA has smooth convergence and is applicable for solving the IEED problem. The IEED’s solution is associated with the total fuel consumption and pollutant emission. The proposed TA method seems to be a viable new approach for finding the optimal solution of the IEED problem.

  11. Optimal operation of cogeneration units. State of art and perspective

    International Nuclear Information System (INIS)

    Polimeni, S.

    2001-01-01

    Optimal operation of cogeneration plants and of power plant fueling waste products is a complex challenge as they have to fulfill, beyond the contractual obligation of electric power supply, the constraints of supplying the required thermal energy to the user (for cogeneration units) or to burn completely the by-products of the industrial complex where they are integrated. Electrical power market evolution is pushing such units to a more and more volatile operation caused by uncertain selling price levels. This work intends to pinpoint the state of art in the optimization of these units outlining the important differences among the different size and cycles. The effect of the market liberalization on the automation systems and the optimization algorithms will be discussed [it

  12. Start up physics tests of units 5 and 6 (WWER 1000) at Kozloduy NPP by comparison with the calculated neutron physics characteristics

    International Nuclear Information System (INIS)

    Antov, A.; Stoyanova, I.

    2008-01-01

    In conjunction with each refuelling shutdown of the reactor core, nuclear design calculations are performed to ensure that the reactor physics characteristics of the new core will be consistent with the safety limits. Prior to return to normal operation, a physics test program is required to determine if the operating characteristics of the core are consistent with the design predictions and to ensure that the core can be operated as designed. Successful completion of the physics test program is demonstrated when the test results agree with the predicted results within predetermined test criteria. Successful completion of the physics test program and successful completion of other tests, which are performed after each refuelling provides assurance that the plant can be operated as designed. The calculated neutron-physics characteristics values of Kozloduy NPP Unit 5 and Unit 6 (WWER 1000) obtained by the computer code package KASKAD are compared with the obtained results during the start up physics tests. The core fuel loading consists of 163 fuel assemblies (FAs). The calculated values are given according to actual experimental conditions of the reactor core during start up physics tests. The report includes comparisons between calculation results by code package KASKAD (BIPR7A) and experimental data values of main neutron-physics characteristics during start up physics tests in selected recent cycles of Kozloduy NPP Unit 5 and Unit 6. (authors)

  13. Start up physics tests of Units 5 and 6 (WWER-1000) at Kozloduy NPP by comparison with the calculated neutron physics characteristics

    International Nuclear Information System (INIS)

    Stoyanova, I.; Antov, A.

    2007-01-01

    In conjunction with each refuelling shutdown of the reactor core, nuclear design calculations are performed to ensure that the reactor physics characteristics of the new core will be consistent with the safety limits. Prior to return to normal operation, a physics test program is required to determine if the operating characteristics of the core are consistent with the design predictions and to ensure that the core can be operated as designed. Successful completion of the physics test program is demonstrated when the test results agree with the predicted results within predetermined test criteria. Successful completion of the physics test program and successful completion of other tests which are performed after each refuelling provides assurance that the plant can be operated as designed. The calculated neutron-physics characteristics values of Kozloduy NPP Unit 5 and Unit 6 (WWER 1000) obtained by the computer code package KASKAD are compared with the obtained results during the start up physics tests. The core fuel loading consists of 163 fuel assemblies. The calculated values are given according to actual experimental conditions of the reactor core during start up physics tests. The report includes comparisons between calculation results by code package KASKAD (BIPR7A) and experimental data values of main neutron-physics characteristics during start up physics tests in selected recent cycles of Kozloduy NPP Unit 5 and Unit 6 (Authors)

  14. Structural characterization and condition for measurement statistics preservation of a unital quantum operation

    International Nuclear Information System (INIS)

    Lee, Kai-Yan; Fung, Chi-Hang Fred; Chau, H F

    2013-01-01

    We investigate the necessary and sufficient condition for a convex cone of positive semidefinite operators to be fixed by a unital quantum operation ϕ acting on finite-dimensional quantum states. By reducing this problem to the problem of simultaneous diagonalization of the Kraus operators associated with ϕ, we can completely characterize the kinds of quantum states that are fixed by ϕ. Our work has several applications. It gives a simple proof of the structural characterization of a unital quantum operation that acts on finite-dimensional quantum states—a result not explicitly mentioned in earlier studies. It also provides a necessary and sufficient condition for determining what kind of measurement statistics is preserved by a unital quantum operation. Finally, our result clarifies and extends the work of Størmer by giving a proof of a reduction theorem on the unassisted and entanglement-assisted classical capacities, coherent information, and minimal output Renyi entropy of a unital channel acting on a finite-dimensional quantum state. (paper)

  15. Limited field investigation report for the 100-KR-4 Operable Unit

    International Nuclear Information System (INIS)

    1994-07-01

    This limited field investigation (LFI) was conducted to optimize the use of interim remedial measures (IRM) for expediting clean up while maintaining a technically sound and cost-effective program. The 100-KR-4 Operable Unit is one of four operable units associated with the 100 K Area. Operable units KR-1, KR-2 and KR-3 address contaminant sources while 100-KR-4 addresses contamination present in the underlying groundwater. The IRM decision process for groundwater operable units is based on three aspects: (1) Is the concentration greater than Hanford background? (2) Does the concentration present a medium or high human-health risk? (3) Does the concentration exceed an ecologically based applicable, relevant and appropriate requirements (ARAR) or present an environmental hazard quotient > I? The primary methods of investigation used during this LFI were the installation of monitoring wells and sampling of groundwater. The samples collected from the groundwater and soils were submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the location and degree of contamination. All soil samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all first round and a minimum of 10% of subsequent round data were validated

  16. Limited field investigation report for the 100-DR-1 Operable Unit

    International Nuclear Information System (INIS)

    1994-06-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-DR-1 Source Operable Unite LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. The 100-DR-1 Operable Unit is one of four operable units associated with the 100 D/DR Area at the Hanford Site. The 100-DR-1 Operable Unit encompasses approximately 1.5 km 2 (0.59 mi 2 ) and is located immediately adjacent to the Columbia River shoreline. In general, it contains waste facilities associated with the original plant facilities constructed to support D Reactor facilities, as well as cooling water retention basin systems for both D and DR Reactors. The 100-DR-1 LFI began the investigative phase of the remedial investigation for a select number of high-priority sites. The LFI was performed to provide additional data needed to support selection, design and implementation of IRM, if needed. The LFI included data compilation, nonintrusive investigations, intrusive investigations, summarization of 100 Area aggregate studies, and data evaluation

  17. Performance of the Digital Science Partnership Remotely-Operated 0.5-Meter Corrected Dall-Kirkham Telescopes

    Science.gov (United States)

    Kielkopf, John F.; Carter, B.; Brown, C.; Hart, R.; Hay, J.; Waite, I.

    2007-12-01

    The Digital Science Partnership, a collaboration of the University of Louisville and the University of Southern Queensland, operates a pair of 0.5-meter telescopes for teaching, research, and informal education. The instruments were installed at sites near Toowoomba, Australia, and Louisville, Kentucky in 2006. The Planewave Instruments optical systems employ a unique Dall-Kirkham design incorporating a two-element corrector that demagnifies the image, flattens the focal plane, and reduces coma. These instruments have a moderately fast f/6.8 focal ratio and maintain image quality with little vignetting over a field 42 mm in diameter (0.7 degree). With a 9-micron pixel CCD such as the KAF-6303E, the image scale of 0.55 seconds of arc per pixel typically yields seeing-limited image quality at our sites. The telescopes and their enclosure are operated in a live remote observing mode through Linux-based software, including a dome-control system that uses RFID tags for absolute rotation encoding. After several months of testing and development we have examples of images and photometry from both sites that illustrate the performance of the system. We will discuss image quality, as well as practical matters such as pointing accuracy and field acquisition, auto-guiding, communication latency in large file transfer, and our experience with remote observing assisted by teleconferencing. Time-delay-integration (TDI) imaging, in which the telescope is stationary while the CCD is clocked to track in right ascension, is under study. The technique offers wide fields of view with very high signal-to-noise ratio, and can be implemented in robotically operated instruments used in monitoring, rapid-response, and educational programs. Results for conventional and TDI imaging from the dark site in Australia compared to the brighter suburban site in Kentucky show the benefits of access to dark sites through international partnerships that remote operation technology offers.

  18. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2, Docket nos. 50-352 and 50-353

    International Nuclear Information System (INIS)

    1989-08-01

    In August 1983 the staff of the Nuclear Regulatory commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for the licenses to operate the Limerick Generating Station, Units 1 and 2, located on a site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 was issued in December 1983. Supplement 2 was issued in October 1984. Supplement 3 was issued in October 1984. Supplement 4 was issued in May 1985. Supplement 5 was issued in July 1985. Supplement 6 was issued in August 1985 and Supplement 7 was issued in April 1989. Supplement 7 addresses the major design differences between Units 1 and 2, the resolution of all issues that remained open when the Unit 1 full-power license was issued, the staff's assessment regarding the application by the licensee to operate Unit 2 and issues that require resolution before issuance of an operating license for Unit 2. Supplements 8 and 9 address further issues that require resolution prior to issuance of an operating license. 1 tab

  19. Integrated Ground Operations Demonstration Units Testing Plans and Status

    Science.gov (United States)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  20. Freestanding midwifery unit versus obstetric unit

    DEFF Research Database (Denmark)

    Overgaard, Charlotte; Møller, Anna Margrethe; Fenger-Grøn, Morten

    2011-01-01

    low-risk women intending FMU birth and a matched control group of 839 low-risk women intending OU birth were included at the start of care in labour. OU women were individually chosen to match selected obstetric/socio-economic characteristics of FMU women. Analysis was by intention to treat. Main......Objective To compare perinatal and maternal morbidity and birth interventions in low-risk women giving birth in two freestanding midwifery units (FMUs) and two obstetric units (OUs). Design A cohort study with a matched control group. Setting The region of North Jutland, Denmark. Participants 839...... women were significantly less likely to experience an abnormal fetal heart rate (RR: 0.3, 95% CI 0.2 to 0.5), fetal–pelvic complications (0.2, 0.05 to 0.6), shoulder dystocia (0.3, 0.1 to 0.9), occipital–posterior presentation (0.5, 0.3 to 0.9) and postpartum haemorrhage >500 ml (0.4, 0.3 to 0...

  1. Main factors determining the KNP units 5 and 6 safety level according to the PSA level 1 result

    International Nuclear Information System (INIS)

    Manchev, B.; Marinova, B.; Nenkova, B.

    2004-01-01

    The Probabilistic Safety Analysis (PSA) is a powerful tool for ascertainment of the safety level reached at nuclear power plants operation. The results of PSA determine very clearly the functions, systems, equipment or operator actions that have to be improved in order to increase the plant safety level as a whole. The present report presents the main results of the last upgraded revision of PSA level 1 of units 5 and 6 of KNPP. The objective of the report is to lay emphasis on the factors determining the result obtained, i.e. to demonstrate the scopes whose improvement leads to an increase of the safety level reached at the units power operation. In the frame of the study presented the following categories of initiating events are included: Internal initiating events; Initiating events result of internal fires; Initiating events result of seismic action; Floods. Only the reactor core is considered as a source of radioactive contamination. Only initiating events related to the reactor work on power are analyzed. Unit 5 of KNPP is accepted as a basic unit for the study. All modifications and design changes implemented up to year 2000 are taken into account. The results of PSA level 1 for units 5 and 6 of KNPP covering the risk of internal initiators are presented. The assessment of the core damage due to internal initiators is based on the analysis of 18 groups of initiating events. 932 consequences and two groups of initial events are identified, leading to core damage. As a result of the quantitative calculation, over 15000 minimal cuts for the core damage are obtained. The first 80 cuts bear over 75% of the frequency obtained, and the first 700 cuts bear over 90%. Distribution of the core damage frequency by different groups of initiators is presented in tables and diagrams. A comparison of the result obtained for the reactor core damage of KNPP units 5 and 6 with assessment obtained for similar power plants is presented. The data for different NPPs are taken

  2. X-ray photoelectron spectroscopic study of direct reforming catalysts Ln{sub 0.5}Sr{sub 0.5}Ti{sub 0.5}Mn{sub 0.5}O{sub 3±d} (Ln = La, Nd, and Sm) for high temperature-operating solid oxide fuel cell

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Keunsoo [Department of Engine Research, Korea Institute of Machinery and Materials, 156 Gajeongbuk-Ro, Daejeon 305-343 (Korea, Republic of); Jeong, Jihoon [Department of Mechanical Engineering, The University of Texas at Austin, Austin, TX 78712 (United States); Azad, Abul K. [Faculty of Integrated Technologies, University Brunei Darussalam, Jalan Tunku Link, Gadong BE1410 (Brunei Darussalam); Jin, Sang Beom [Department of Advanced Materials Science and Engineering, Hanbat National University, 125, Dongseo-Daero, Yusung-Gu, Daejeon 305-719 (Korea, Republic of); Kim, Jung Hyun, E-mail: jhkim2011@hanbat.ac.kr [Department of Advanced Materials Science and Engineering, Hanbat National University, 125, Dongseo-Daero, Yusung-Gu, Daejeon 305-719 (Korea, Republic of)

    2016-03-01

    Graphical abstract: Measured Ti 2p peaks and deconvolution peaks of Nd{sub 0.5}Sr{sub 0.5}Ti{sub 0.5}Mn{sub 0.5}O{sub 3±d} under oxidizing condition (left) and NSTM under reducing condition (right). - Highlights: • Chemical states of Ln{sub 0.5}Sr{sub 0.5}Ti{sub 0.5}Mn{sub 0.5}O{sub 3±d} (Ln: La, Nd and Sm) were analyzed. • Charge compensation occurred with the reduction of Mn and Ti. • The Nd substitution effect allowed some Ti to convert into a metallic behavioral component. • NSTM and SSTM had a large amount of lattice oxygen; however, LSTM retained a large quantity of adsorbed oxygen. - Abstract: Chemical states of lanthanide doped perovskite for direct reforming anode catalysts, Ln{sub 0.5}Sr{sub 0.5}Ti{sub 0.5}Mn{sub 0.5}O{sub 3±d} (Ln = La, Nd, and Sm) have been studied by X-ray Photoelectron Spectroscopy (XPS) in order to determine the effects of various lanthanide substitution in complex perovskites for high temperature-operating solid oxide fuel cells (HT-SOFC). The charge state of lanthanide ions remained at 3+ and the binding energies of the lanthanide ions in Ln{sub 0.5}Sr{sub 0.5}Ti{sub 0.5}Mn{sub 0.5}O{sub 3±d} were located in a relatively lower range compared to those of conventional lanthanide oxides. Mn and Ti were regarded as charge compensation components in Ln{sub 0.5}Sr{sub 0.5}Ti{sub 0.5}Mn{sub 0.5}O{sub 3±d}; Mn was more influential than Ti. In the cases of substituting Nd and Sm into Ln{sub 0.5}Sr{sub 0.5}Ti{sub 0.5}Mn{sub 0.5}O{sub 3±d}, some portion of Ti showed metallic behavior; the specific Mn satellite peak indicating an electro-catalytic effect had occurred. Three types of oxygen species comprised of lattice oxygen, carbonate species, and adsorbed oxygen species were observed in Ln{sub 0.5}Sr{sub 0.5}Ti{sub 0.5}Mn{sub 0.5}O{sub 3±d} from the O 1s spectra; a high portion of lattice oxygen was observed in both Nd{sub 0.5}Sr{sub 0.5}Ti{sub 0.5}Mn{sub 0.5}O{sub 3±d} (NSTM) and Sm{sub 0.5}Sr{sub 0.5}Ti{sub 0.5}Mn{sub 0.5}O

  3. Latin-American Co-operation in Biotechnology Programme: Industrial penicillin amidase for 6 amino penicillanic acid production

    Directory of Open Access Journals (Sweden)

    Dolly Montoya C.

    2001-07-01

    Full Text Available This work evaluates technological and economic transference related to the Production of Penicillin Amidase for use in 6 Amine Penicillanic acid (6-APA Production Project, wich is a part of the United Nations1 Regional Biotechnology Programme for Latin America and the Caribbean. This paper analyses the evolution of international cooperation by looking at the project's development. The methodology used includes analysis of: the project's development; participant and budgetary goals; results; copyright; project conditions; and sale of biocatalyst and 6-APA. All technical objectives were achieved; international co-operation, as well as co-operation between Industry and University were successful. Technological transference to the pilot plant was effective; many students involved in the project were simultaneously taking M.Sc. and Ph.D's courses. Nevertheless, neither the technology necessary for the biocatalyst's manufacture nor the biocatalyst itself were used. Analysis of the project has provided some orientation concerning those internal and external problems which arose during the development and sale of biotechnology in our countries and has tried to propose some alternatives for taking advantage of international co-operation.

  4. Operating experience with unit for sulfuric acid alkylation of isobutane by butylenes

    Energy Technology Data Exchange (ETDEWEB)

    Tagavov, I.T.; Sumanov, V.T.; Khadzhiev, S.N.

    1988-09-01

    The operation of units for the sulfuric acid alkylation of isobutanes by butylenes have been performed. The reaction was carried out in a KSG-3 horizontal sulfuric acid contractor. A butane-butylene fraction from catalytic cracking and an isobutane fraction from the central gas fractionating unit were used as a feedstock. The studies have shown that the unit will give a high-quality product under various conditions of operation. The specific consumption of sulfuric acid in processing different types of feed remains within acceptable limits.

  5. Maintaining reduced noise levels in a resource-constrained neonatal intensive care unit by operant conditioning.

    Science.gov (United States)

    Ramesh, A; Denzil, S B; Linda, R; Josephine, P K; Nagapoornima, M; Suman Rao, P N; Swarna Rekha, A

    2013-03-01

    To evaluate the efficacy of operant conditioning in sustaining reduced noise levels in the neonatal intensive care unit (NICU). Quasi-experimental study on quality of care. Level III NICU of a teaching hospital in south India. 26 staff employed in the NICU. (7 Doctors, 13 Nursing staff and 6 Nursing assistants). Operant conditioning of staff activity for 6 months. This method involves positive and negative reinforcement to condition the staff to modify noise generating activities. Comparing noise levels in decibel: A weighted [dB (A)] before conditioning with levels at 18 and 24 months after conditioning. Decibel: A weighted accounts for noise that is audible to human ears. Operant conditioning for 6 months sustains the reduced noise levels to within 62 dB in ventilator room 95% CI: 60.4 - 62.2 and isolation room (95% CI: 55.8 - 61.5). In the preterm room, noise can be maintained within 52 dB (95% CI: 50.8 - 52.6). This effect is statistically significant in all the rooms at 18 months (P = 0.001). At 24 months post conditioning there is a significant rebound of noise levels by 8.6, 6.7 and 9.9 dB in the ventilator, isolation and preterm room, respectively (P =0.001). Operant conditioning for 6 months was effective in sustaining reduced noise levels. At 18 months post conditioning, the noise levels were maintained within 62 dB (A), 60 dB (A) and 52 dB (A) in the ventilator, isolation and pre-term room, respectively. Conditioning needs to be repeated at 12 months in the ventilator room and at 18 months in the other rooms.

  6. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. Shanklin

    2006-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003

  7. Limited field investigation report for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-09-01

    This limited field investigation (LFI) was conducted to assess the applicability of interim remedial measures (IRM) for reducing human health and environmental risks within the 100-HR-3 Groundwater Operable Unit. The 100-HR-3 Operable Unit is comprised of three subareas; the 100 D Area, the 100 H Area and those portions of the 600 Area between the two reactor areas. The operable unit is one of seven operable units associated with the 100 D and H Areas. Operable units 100-DR-1, 100-DR-2, 100-DR-3, 100-HR-1, 100-HR-2 and 100-IU-4 address contaminant sources while 100-HR-3 addresses contamination present in the underlying groundwater. The primary method of field investigation used during this LFI was the installation and sampling of monitoring wells. Samples were collected from the groundwater and soils, and submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the locations and levels of contaminants. All samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all round one, two and three and a minimum of 10% of round four data associated with the LFI were validated. A screening method was used to identify contaminants of potential concern (COPC). This screening method eliminated from further consideration, constituents that were below background. Constituents which are considered non-toxic to humans were eliminated from the human health evaluation. Data consistency and blank contamination were also evaluated in the screening process. These COPC were then evaluated further in the qualitative risk assessment (QRA). A human health QRA was performed using conservative (maximum equilibrated contaminant levels from the LFI) analyses

  8. Limited field investigation report for the 100-HR-2 Operable Unit

    International Nuclear Information System (INIS)

    1994-09-01

    This report summarizes the data collection and analysis activities conducted during the 100-HR-2 Operable Unit investigative phase and the associated qualitative risk assessment (QRA). The 100-HR-2 Operable Unit contains solid waste burial grounds, an ash pit, bum pits, electrical facilities, septic systems, and support facilities. All known and suspected areas of contamination were classified as solid waste burial grounds or low-priority waste sites based on the collective knowledge of the operable unit managers (representatives from the US Department of Energy [DOE], the US Environmental Protection Agency [EPA], and Washington Department of Ecology [Ecology]) during the preparation of the 100-HR-2 Operable Unit work plan (DOE/RL 1993f). Solid waste burial grounds were judged to pose sufficient risk(s), through one or more pathways, to require evaluation for an interim remedial measure (IRM) as per the Hanford Past-Practice Strategy (HPPS) (DOE/RL 1991) and negotiations with DOE, EPA, and Ecology. An IRM is intended to achieve remedies that are likely to lead to a final record of decision. Low-priority sites are those judged not to pose significant risk to require the streamlined evaluation. There were six low-priority waste sites and seven solid waste burial grounds identified. The investigative phase was conducted in accordance with the RCRA Facility Investigation/Corrective Measures Study Work Plan for the 100-HR-2 Operable Unit (DOE/RL 1993f). The QRA was performed in accordance with the Hanford Site Baseline Risk Assessment Methodology (DOE/RL 1993b) and the recommendations incorporate the strategies of the HPPS. The purpose of this report is to: (1) provide a summary of site investigative activities; (2) refine the conceptual exposure model (as needed); (3) identify chemical- and location-specific corrective action requirements; and (4) provide a human health and ecological QRA associated with solid waste burial grounds

  9. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Supporting MELCOR calculations, Volume 6, Part 2

    International Nuclear Information System (INIS)

    Kmetyk, L.N.; Brown, T.D.

    1995-03-01

    To gain a better understanding of the risk significance of low power and shutdown modes of operation, the Office of Nuclear Regulatory Research at the NRC established programs to investigate the likelihood and severity of postulated accidents that could occur during low power and shutdown (LP ampersand S) modes of operation at commercial nuclear power plants. To investigate the likelihood of severe core damage accidents during off power conditions, probabilistic risk assessments (PRAs) were performed for two nuclear plants: Unit 1 of the Grand Gulf Nuclear Station, which is a BWR-6 Mark III boiling water reactor (BWR), and Unit 1 of the Surry Power Station, which is a three-loop, subatmospheric, pressurized water reactor (PWR). The analysis of the BWR was conducted at Sandia National Laboratories while the analysis of the PWR was performed at Brookhaven National Laboratory. This multi-volume report presents and discusses the results of the BWR analysis. The subject of this part presents the deterministic code calculations, performed with the MELCOR code, that were used to support the development and quantification of the PRA models. The background for the work documented in this report is summarized, including how deterministic codes are used in PRAS, why the MELCOR code is used, what the capabilities and features of MELCOR are, and how the code has been used by others in the past. Brief descriptions of the Grand Gulf plant and its configuration during LP ampersand S operation and of the MELCOR input model developed for the Grand Gulf plant in its LP ampersand S configuration are given

  10. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Supporting MELCOR calculations, Volume 6, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    Kmetyk, L.N.; Brown, T.D. [Sandia National Labs., Albuquerque, NM (United States)

    1995-03-01

    To gain a better understanding of the risk significance of low power and shutdown modes of operation, the Office of Nuclear Regulatory Research at the NRC established programs to investigate the likelihood and severity of postulated accidents that could occur during low power and shutdown (LP&S) modes of operation at commercial nuclear power plants. To investigate the likelihood of severe core damage accidents during off power conditions, probabilistic risk assessments (PRAs) were performed for two nuclear plants: Unit 1 of the Grand Gulf Nuclear Station, which is a BWR-6 Mark III boiling water reactor (BWR), and Unit 1 of the Surry Power Station, which is a three-loop, subatmospheric, pressurized water reactor (PWR). The analysis of the BWR was conducted at Sandia National Laboratories while the analysis of the PWR was performed at Brookhaven National Laboratory. This multi-volume report presents and discusses the results of the BWR analysis. The subject of this part presents the deterministic code calculations, performed with the MELCOR code, that were used to support the development and quantification of the PRA models. The background for the work documented in this report is summarized, including how deterministic codes are used in PRAS, why the MELCOR code is used, what the capabilities and features of MELCOR are, and how the code has been used by others in the past. Brief descriptions of the Grand Gulf plant and its configuration during LP&S operation and of the MELCOR input model developed for the Grand Gulf plant in its LP&S configuration are given.

  11. Radioactive acid digestion test unit nonradioactive startup operations

    International Nuclear Information System (INIS)

    Allen, C.R.; Cowan, R.G.; Crippen, M.D.; Divine, J.R.

    1978-05-01

    The Radioactive Acid Digestion Test Unit (RADTU) will process 5 kg/hour of combustible solid waste and is designed to handle almost all solid combustible waste found in plutonium processing with plutonium contamination levels up to scrap. The RADTU is designed with special safety features to safely contain high masses of fissile materials and to safely handle unusual materials and reactive chemicals which may find their way into the waste. Nonradioactive operating experience to date has been very satisfactory. RADTU has been operated for extended runs on both a 24-hour per day basis as well as on a one shift per day basis. Some minor operating problems have been encountered as expected in a shakedown operation. In general, solutions to these have been readily found. 12 figures

  12. Analysis of long-time operation of micro-cogeneration unit with fuel cell

    Directory of Open Access Journals (Sweden)

    Patsch Marek

    2015-01-01

    Full Text Available Micro-cogeneration is cogeneration with small performance, with maximal electric power up to 50 kWe. On the present, there are available small micro-cogeneration units with small electric performance, about 1 kWe, which are usable also in single family houses or flats. These micro-cogeneration units operate on principle of conventional combustion engine, Stirling engine, steam engine or fuel cell. Micro-cogeneration units with fuel cells are new progressive developing type of units for single family houses. Fuel cell is electrochemical device which by oxidation-reduction reaction turn directly chemical energy of fuel to electric power, secondary products are pure water and thermal energy. The aim of paper is measuring and evaluation of operation parameters of micro-cogeneration unit with fuel cell which uses natural gas as a fuel.

  13. Configuration Management Program Application at KNPP Units 5 and 6 Modernization Program

    International Nuclear Information System (INIS)

    Manchev, B.; Yordanova, V.; Nenkova, B.

    2006-01-01

    The need for Configuration Management Program development, became very clear after the initiation of the Modernization Program for Units 5and6, because KNPP personnel needed a good and safe way to control the huge amount of data which were transferred into two directions - input data (design and operational documents from KNPP to Contractors) and the design, vendor, procurement, etc. documents (from Contractors to KNPP). Moreover, most of the measures are in fact design changes and it appeared to be extremely important to track these design changes and their reflection into design and operational documents. It is even more important to obtain a successful transfer of all this information to the operating organization (EP-2) after the completion. The proposal for development of Configuration Management (CM) Program for KNPP Units 5and6 Modernization program was divided into three phases: 1. Information Control (Document Control and Records Management) 2.Technical Decision System (Change Control) 3. Master Equipment List (MEL), (as part of the Design requirements element) Information Control Element was chosen to be developed first. Implementation of Information Control element comprised of: Review and assessment of existing situation (procedures for document control and records Management), Development of new/revision of existing procedure for Document Control and Records Management, Development of SmartDoc software application in support of document control and records management and for measure documentation tracking (with its specifics), Data entry for MP5and6 measures, Implementation at EP-2 (with successful data migration from the existing databases). The SmartDoc development was completed at the end of 2002 and after a testing period it was implemented at Modernization and Investment Department first. Then the data for documents were transferred from the existing databases at EP-2 and the system was implemented at EP-2 and other KNPP facilities. Development

  14. Hanford Site waste management units report

    International Nuclear Information System (INIS)

    1993-04-01

    The Hanford Site Waste Management Units Report was originated to provide information responsive to Section 3004(u) of the Hazardous and Solid Waste Amendments of the 1984. This report provides a comprehensive inventory of all types of waste management units at the Hanford Site, including a description of the units and the waste they contain. Waste management units in the report include: (1) Resource Conservation and Recovery Act of 1976 (RCRA) disposal units, (2) Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) disposal units, (3) unplanned releases, (4) inactive contaminated structures, (5) RCRA treatment, storage, and disposal (TSD) units, and (6) other storage areas. Because of the comprehensive nature of the units report, the list of units is more extensive than required by Section 3004(u) of Hazardous and Solid Waste Amendments of the 1984. In Sections 3.0 through 6.0 of this report, the four aggregate areas are subdivided into their operable units. The operable units are further divided into two parts: (1) those waste management units assigned to the operable unit that will be remediated as part of the Environmental Restoration Remedial Actions (ERRA) Program, and (2) those waste management units located within the operable unit boundaries but not assigned to the ERRA program. Only some operable unit sections contain the second part

  15. Oxygen vacancy as fatigue evidence of La0.5Sr0.5CoO3/PbZr0.4Ti0.6O3/La0.5Sr0.5CoO3 capacitors

    Science.gov (United States)

    Liu, B. T.; Chen, J. E.; Sun, J.; Wei, D. Y.; Chen, J. H.; Li, X. H.; Bian, F.; Zhou, Y.; Guo, J. X.; Zhao, Q. X.; Guan, L.; Wang, Y. L.; Guo, Q. L.; Ma, L. X.

    2010-09-01

    La0.5Sr0.5CoO3 (LSCO) films grown on SrTiO3 substrates, cooled at reduced oxygen pressures, ranging from 8×104 to 1×10-4 Pa, from the depostion temperature, are used as the bottom electrodes of PbZr0.4Ti0.6O3 (PZT) capacitors to study the impact of oxygen stoichiometry of the LSCO bottom electrodes on the structural and physical properties of LSCO/PZT/LSCO capacitors. It is found that the tetragonality, polarization and fatigue-resistance of PZT films decrease with the decrease of the cooling oxygen pressure. Almost 60% polarization degradation occurs for the PZT capacitor with the LSCO bottom electrode cooled in 1×10-4 Pa oxygen up to 1010 switching cycles, indicating that the oxygen vacancy of the bottom electrode can result in fatigue of the LSCO/PZT/LSCO capacitor.

  16. Ergonomic relationship during work in nursing staff of intensive care unit with operating room

    Directory of Open Access Journals (Sweden)

    Yousef Mahmoudifar

    2017-01-01

    Full Text Available Background and Objectives: High prevalence of work-related musculoskeletal disorders, especially in jobs such as nursing which covers tasks like patients' repositioning, has attracted great attentions from occupational healthcare experts to necessitate the knowledge of ergonomic science. Therefore, this study was performed aiming at ergonomic relationship during work in nursing staff of Intensive Care Unit (ICU with operating room. Materials and Methods: In this descriptive-analytical study (cohort, fifty personnel of ICU staff and fifty of operating room staff were selected through a census method and were assessed using tools such as Nordic questionnaire and Rapid Entire Body Assessment (REBA standards in terms of body posture ergonomics. The obtained data were analyzed by SPSS software and Chi-Square test after collection. Results: The most complaints were from the operating room group (68% and ICU staff (60% for the lumbar musculoskeletal system. There was a significant relationship between the total REBA scores of body, legs, neck, arm, force status, load fitting with hands and static or dynamic activities in the operating room and ICU staff groups (P < 0.05. In operating room and ICU groups, most subjects obtained score 11–15 and very high-risk level. Conclusion: Nurses working at operating room and ICU ward are subjected to high-risk levels and occupational injuries which is dramatically resulted from inappropriate body posture or particular conditions of their works. As a result, taking corrective actions along with planning and identifying ways will help prohibiting the prevalence of disorders in the future.

  17. Synthesis of nano-Ce{sub 0.5}Zr{sub 0.5}O{sub 2} by absorption of ammonia into water-in-oil microemulsion in a rotor–stator reactor

    Energy Technology Data Exchange (ETDEWEB)

    Li, Yingwen; Wang, Hongrun; Arowo, Moses; Sun, Baochang, E-mail: sunbc@mail.buct.edu.cn; Chen, Jianfeng; Shao, Lei, E-mail: shaol@mail.buct.edu.cn [Beijing University of Chemical Technology, State Key Laboratory of Organic–Inorganic Composites (China)

    2015-01-15

    A gas-microemulsion reaction precipitation method was employed to prepare nano-Ce{sub 0.5}Zr{sub 0.5}O{sub 2} by absorption of NH{sub 3} into water-in-oil (W/O) microemulsion in a rotor–stator reactor . The effects of different operating conditions including final pH of the microemulsion, reaction temperature, initial Ce{sup 3+} and Zr{sup 4+} concentration, rotation speed, and gas–liquid volumetric ratio were investigated. Nano-Ce{sub 0.5}Zr{sub 0.5}O{sub 2} with an average diameter of about 5.5 nm, a specific surface area of 215.6 m{sup 2}/g and a size distribution of 4–8 nm was obtained under the optimum operating conditions. The as-prepared nano-Ce{sub 0.5}Zr{sub 0.5}O{sub 2} was loaded with Au to prepare nano-Au/Ce{sub 0.5}Zr{sub 0.5}O{sub 2} catalyst which was subsequently used for CO oxidation test. CO conversion rate reached 100 % at room temperature, indicating high catalytic activity of the nano-Au/Ce{sub 0.5}Zr{sub 0.5}O{sub 2} catalyst.

  18. Enhanced CANDU 6 Reactor

    International Nuclear Information System (INIS)

    Azeez, S.; Alizadeh, A.; Girouard, P.

    2005-01-01

    Full text: The CANDU 6 power reactor is visionary in its approach, remarkable for its on-power refuelling capability and proven over years of safe, economical and reliable power production. Developed by Atomic Energy of Canada Ltd, the CANDU 6 design offers excellent performance utilizing state-of-the-art technology. The first CANDU 6 plants went into service in the early 1980's as leading edge technology and the design has been continuously advanced to maintain superior performance with an outstanding safety record. The first CANDU 6 plants- Gentilly 2 and Point Lepreau in Canada, Embalse in Argentina and Wolsong- Unit 1 in Korea have been in service for more than 21 years and are still producing electricity at peak performance and to the end of 2004, their average lifetime Capacity Factor was 83.2%. The newer CANDU 6 units in Romania (Cernavoda 1), Korea (Wolsong-Units 2, 3 and 4) and Qinshan (Phase III- Units 1 and 2) have also been performing at outstanding levels. The average lifetime Capacity Factor of the 10 CANDU 6 operating units around the world has been 87% to the end of 2004. Building on these successes, AECL is committed to the further development of this highly successful design, now focussing on meeting customer's needs for reduced costs, further improvements to plant operation and performance, enhanced safety and incorporating up-to-date technology as warranted. This has resulted in AECL embarking on improving the CANDU 6 design through an upgraded product termed as the 'Enhanced CANDU 6' (EC6)- which incorporates several attractive but proven features that will make the CANDU 6 reactor even more economical, safer and easier to operate. Some of the key features that will be incorporated in the EC6 include increasing the plant's power output, shortening the overall project schedule, decreasing the capital cost, dealing with obsolescence issues, optimizing maintenance outages and incorporating lessons learnt through feedback obtained from the

  19. NZG 201 portable spectrometric unit

    International Nuclear Information System (INIS)

    Jursa, P.; Novakova, O.; Slezak, V.

    The NZG 201 spectrometric unit is a portable single-channel processing unit supplied from the mains or a battery which allows the qualitative and quantitative measurement of different types of ionizing radiation when connected to a suitable detection unit. The circuit layout and the choice of control elements makes the spectrometric unit suitable for use with scintillation detector units. The spectrometric unit consists of a pulse amplifier, an amplitude pulse analyzer, a pulse counter, a pulse rate counter with an output for a recorder, a high voltage source and a low voltage source. The block diagram is given. All circuits are modular and are mounted on PCB's. The apparatus is built in a steel cabinet with a raised edge which protects the control elements. The linear pulse amplifier has a maximum gain of 1024, the pulse counter has a maximum capacity of 10 6 -1 imp and time resolution better than 0.5 μs. The temperature interval at which the apparatus is operational is 0 to 45 degC, its weight is 12.5 kg and dimensions 36x280x310 mm, energy range O.025 to 2.5 MeV, for 137 Cs the energy resolution is 8 to 10%. The spectrometric unit NZG 2O1 may, with regard to its parameters, number and range of control elements, be used as a universal measuring unit. (J.P.)

  20. Electronic structures and abnormal phonon behaviors of cobalt-modified Na0.5Bi0.5TiO3-6%BaTiO3 single crystals

    Science.gov (United States)

    Huang, T.; Zhang, P.; Xu, L. P.; Chen, C.; Zhang, J. Z.; Hu, Z. G.; Luo, H. S.; Chu, J. H.

    2016-10-01

    Optical properties, electronic structures, and structural variations of x wt% cobalt (Co) doped Na0.5Bi0.5TiO3-6%BaTiO3 (x=0%, 0.5%, 0.8%) single crystals have been studied by temperature-dependent optical ellipsometry and Raman spectra from 250 to 650 K. Based on the temperature evolution of electronic transitions (Ecp1 and Ecp2) and the phonon modes involving Ti-O vibrations, two critical temperature points exhibit an increasing trend with Co dopants, which are related to structural variations for ferroelectric to anti-ferroelectric, and anti-ferroelectric to paraelectric transition, respectively. Additionally, distinguishing abnormal phonon behaviors can be observed from Raman spectra for the crystal of x=0.5% and 0.8%, which show reverse frequency shift of the modes involving Ti-O vibration. It can be ascribed to different relative concentration of Co2+ and Co3+ in the crystals, which has been confirmed by X-ray Photoelectron Spectroscopy data.

  1. Electronic structures and abnormal phonon behaviors of cobalt-modified Na0.5Bi0.5TiO3-6%BaTiO3 single crystals

    Directory of Open Access Journals (Sweden)

    T. Huang

    2016-10-01

    Full Text Available Optical properties, electronic structures, and structural variations of x wt% cobalt (Co doped Na0.5Bi0.5TiO3-6%BaTiO3 (x=0%, 0.5%, 0.8% single crystals have been studied by temperature-dependent optical ellipsometry and Raman spectra from 250 to 650 K. Based on the temperature evolution of electronic transitions (Ecp1 and Ecp2 and the phonon modes involving Ti-O vibrations, two critical temperature points exhibit an increasing trend with Co dopants, which are related to structural variations for ferroelectric to anti-ferroelectric, and anti-ferroelectric to paraelectric transition, respectively. Additionally, distinguishing abnormal phonon behaviors can be observed from Raman spectra for the crystal of x=0.5% and 0.8%, which show reverse frequency shift of the modes involving Ti-O vibration. It can be ascribed to different relative concentration of Co2+ and Co3+ in the crystals, which has been confirmed by X-ray Photoelectron Spectroscopy data.

  2. ZnO nanorods/ZnS.(1,6-hexanediamine)0.5 hybrid nanoplates hierarchical heteroarchitecture with improved electrochemical catalytic properties for hydrazine

    Science.gov (United States)

    Wu, Zhengcui; Wu, Yaqin; Pei, Tonghui; Wang, Huan; Geng, Baoyou

    2014-02-01

    Novel hierarchical heteronanostructures of ZnO nanorods/ZnS.(HDA)0.5 (HDA = 1,6-hexanediamine) hybrid nanoplates on a zinc substrate are successfully synthesized on a large scale by combining hydrothermal growth (for ZnO nanorods) and liquid chemical conversion (for ZnS.(HDA)0.5 nanoplates) techniques. The formation of ZnS.(HDA)0.5 hybrid nanoplates branches takes advantage of the preferential binding of 1,6-hexanediamine on specific facets of ZnS, which makes the thickening rate much lower than the lateral growth rate. The ZnS.(HDA)0.5 hybrid nanoplates have a layered structure with 1,6-hexanediamine inserted into interlayers of wurtzite ZnS through the bonding of nitrogen. The number density and thickness of the secondary ZnS.(HDA)0.5 nanoplates can be conveniently engineered by variation of the sulfur source and straightforward adjustment of reactant concentrations such as 1,6-hexanediamine and the sulfur source. The fabricated ZnO/ZnS.(HDA)0.5 heteronanostructures show improved electrochemical catalytic properties for hydrazine compared with the primary ZnO nanorods. Due to its simplicity and efficiency, this approach could be similarly used to fabricate varieties of hybrid heterostructures made of materials with an intrinsic large lattice mismatch.Novel hierarchical heteronanostructures of ZnO nanorods/ZnS.(HDA)0.5 (HDA = 1,6-hexanediamine) hybrid nanoplates on a zinc substrate are successfully synthesized on a large scale by combining hydrothermal growth (for ZnO nanorods) and liquid chemical conversion (for ZnS.(HDA)0.5 nanoplates) techniques. The formation of ZnS.(HDA)0.5 hybrid nanoplates branches takes advantage of the preferential binding of 1,6-hexanediamine on specific facets of ZnS, which makes the thickening rate much lower than the lateral growth rate. The ZnS.(HDA)0.5 hybrid nanoplates have a layered structure with 1,6-hexanediamine inserted into interlayers of wurtzite ZnS through the bonding of nitrogen. The number density and thickness of the

  3. Phase 1 remedial investigation report for 200-BP-1 operable unit. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit.

  4. Pressure Swing Adsorption in the Unit Operations Laboratory

    Science.gov (United States)

    Ganley, Jason

    2018-01-01

    This paper describes a student laboratory in the Unit Operations Laboratory at the Colorado School of Mines: air separation by pressure swing adsorption. The flexibility of the system enables students to study the production of enriched nitrogen or oxygen streams. Automatic data acquisition permits the study of cycle steps and performance.…

  5. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  6. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  7. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  8. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. E. Shanklin

    2007-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772)

  9. Test Operations Procedure (TOP) 05-2-543 Enhanced Flight Termination Receiver (EFTR) Range Certification Testing

    Science.gov (United States)

    2011-07-25

    35 5.10 Signal Strength Telemetry Output ( SSTO ) (Test Number 10) ............ 38 5.11 Operational...All command outputs and monitor outputs shall respond properly. TOP 05-2-543 25 July 2011 38 5.10 Signal Strength Telemetry Output ( SSTO ...Test Number 10). a. Purpose. This test verifies that the signal strength telemetry output ( SSTO ) voltage is monotonic and directly related to the

  10. Brunswick Steam Electric Plant, Units 1 and 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 30,399 MWH with the generator on line 334.5 hrs. Unit 2 generated 2,481,014 MWH with the generator on line 4,915.53 hrs. Information is presented concerning operations, shutdowns and power reductions, maintenance, power generation, modifications, changes to operational procedures, radiation exposures, and leak rate testing

  11. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a)

  12. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a)

  13. Final record of decision for remedial actions at Operable Unit 4

    International Nuclear Information System (INIS)

    1994-12-01

    This decision document presents the selected remedial action for Operable Unit 4 of the Fernald Site in Fernald, Ohio. This remedial action was selected in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and to the extent practicable 40 Code of Federal Regulations (CFR) Part 300, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). For Operable Unit 4 at the FEMP, DOE has chosen to complete an integrated CERCLA/NEPA process. This decision was based on the longstanding interest on the part of local stakeholders to prepare an Environmental Impact Statement (EIS) on the restoration activities at the FEMP and on the recognition that the draft document was issued and public comments received. Therefore, this single document is intended to serve as DOE's Record of Decision (ROD) for Operable Unit 4 under both CERCLA and NEPA; however, it is not the intent of the DOE to make a statement on the legal applicability of NEPA to CERCLA actions

  14. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Vukelich, S.E. [Golder Associates, Inc., Richland, WA (United States)

    1994-09-22

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River.

  15. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    International Nuclear Information System (INIS)

    Vukelich, S.E.

    1994-01-01

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River

  16. 14 CFR 375.41 - Agricultural and industrial operations within the United States.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Agricultural and industrial operations... Agricultural and industrial operations within the United States. Foreign civil aircraft shall not be used for such commercial air operations as crop dusting, pest control, pipeline patrol, mapping, surveying...

  17. Limited field investigation report for the 100-HR-2 Operable Unit

    International Nuclear Information System (INIS)

    1995-07-01

    This report summarizes the data collection and analysis activities conducted during the 100-HR-2 Operable Unit investigative phase and the associated qualitative risk assessment. The 100-HR-2 Operable Unit contains solid waste burial grounds, an ash pit, burn pits, electrical facilities, septic systems, and support facilities. All known and suspected areas of contamination were classified as solid waste burial grounds or low-priority waste sites based on the collective knowledge of the operable unit managers (representatives from the US Department of Energy, the US Environmental Protection Agency, and Washington State Department of Ecology during the preparation of the 100-HR-2 Operable Unit Work Plan (DOE-RL 1993f). Solid waste burial grounds were judged to pose sufficient risk(s), through one or more pathways, to require evaluation for an interim remedial measure as per the Hanford Past-Practice Strategy (DOE-RL 1991) and negotiations with the Department of Energy, US Environmental Protection Agency, and Washington State Department of Ecology. An interim remedial measure is intended to achieve remedies that are likely to lead to a final record of decision. Low-priority sites are those judged not to pose significant risk to require the streamlined evaluation. There were six low-priority waste sites and seven solid waste burial grounds identified. The purpose of this report is to: (1) provide a summary of site investigative activities; (2) refine the conceptual exposure model (as needed); (3) identify chemical- and location-specific corrective action requirements; and 4) provide a human health and ecological QRA associated with solid waste burial grounds

  18. Feasibility study report for Operable Unit 4: Volume 1

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP

  19. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Biggerstaff, R.L.

    1994-06-30

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy`s (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment.

  20. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    International Nuclear Information System (INIS)

    Biggerstaff, R.L.

    1994-01-01

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy's (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment

  1. Remedial investigation/feasibility study work plan for the 100-BC-5 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-04-01

    Four areas of the Hanford Site (the 100, 200, 300 and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plant and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  2. Training operators of VVER-1000 units in Eastern Europe

    International Nuclear Information System (INIS)

    Normand, X.; Nabet, E.; Hauesberger, P.

    1996-01-01

    The VVER 1000 is the most recent nuclear reactor designed in the former Soviet Union. Its design and operation principles are close to Western four-loop reactors in the 1000- to 1500-MW class; therefore, the Western simulation technology is usually directly applicable to the simulation of these units. Moreover, the current number of state-of-the-art training simulators in operation is very limited. A total of 19 units are in operation, while only 2 modern simulators are available (full-scope type) in Balakovo and Zaporozhe. Access to these simulators is practically limited to the respective plants' trainees, which means that the other units have to be satisfied with hands-on training. Facing this situation and taking into account the predicted lifetime of these plants (15 to 25 yr to go, maybe more), a lot of effort has been made in recent years to provide the plants with modern simulators. The major hurdles to this action were obviously financial and technical (availability of codes, computers, software tools). Today, one full-scope project (Kalinin) is almost complete, and three have been announced (Novovoronezh, Khmelnitsky, Kozloduy). Full-scope simulators are clearly the ultimate target of a concerned power plants. However, all users do realize the advantages of the complementary approach with compact simulators: 1. They can be available quickly for starting the training process. 2. They cover a training field that is not (or partly) addressed by full-scope simulators, i.e., the demonstration of physical phenomena in normal and accidental situations

  3. Operative training in otolaryngology in the United Kingdom: a specialist registrar survey

    NARCIS (Netherlands)

    Georgalas, Christos; Hadjihannas, Edward; Ghufoor, Khalid; Pracy, Paul; Papesch, Michael

    2005-01-01

    OBJECTIVE: To assess the current status of operative training for otolaryngology specialist registrars in the United Kingdom. DESIGN: Web-based questionnaire survey. PARTICIPANTS: All otolaryngology specialist registrars in the United Kingdom. MAIN OUTCOME MEASURES: The overall satisfaction with

  4. Safety Evaluation Report related to the operation of Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441). Supplement No. 6

    International Nuclear Information System (INIS)

    1985-04-01

    Supplement No. 6 to the Safety Evaluation Report (NUREG-0887) on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-540 and 50-441), has been prepared by the Office of the Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio, approximately 35 miles northeast of Cleveland, Ohio. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1 through 5 to that report

  5. Level 1 shutdown and low power operation of Mochovce NPP, Unit 1, Slovakia

    International Nuclear Information System (INIS)

    Halada, P.; Cillik, I.; Stojka, T.; Kuzma, M.; Prochaska, J.; Vrtik, L.

    2004-01-01

    The paper presents general approach, used methods and form of documentation of the results that have been applied within the shutdown and low power PSA (SPSA) study for Mochovce NPP, Unit 1, Slovakia. The SPSA project was realized by VUJE Trnava Inc., Slovakia in 2001-2002 years. The Level 1 SPSA study for Mochovce NPP Unit 1 covers internal events as well as internal (fires, floods and heavy load drop) and external (aircraft crash, extreme meteorological conditions, seismic event and influence of surrounding industry) hazards. Mochovce NPP consists of two operating units equipped with VVER 440/V213 reactors safety upgraded before construction finishing and operation start. 87 safety measures based on VVER 440 operational experience and international mission insights were implemented to enhance its operational and nuclear safety. The SPSA relates to full power PSA (FPSA) as a continuation of the effort to create a harmonized level 1 PSA model for all operational modes of the plant with the goal to use it for further purposes as follows: Real Time Risk Monitor, Maintenance Optimization, Technical Specifications Optimization, Living PSA. (author)

  6. ZnO nanorods/ZnS·(1,6-hexanediamine)(0.5) hybrid nanoplates hierarchical heteroarchitecture with improved electrochemical catalytic properties for hydrazine.

    Science.gov (United States)

    Wu, Zhengcui; Wu, Yaqin; Pei, Tonghui; Wang, Huan; Geng, Baoyou

    2014-03-07

    Novel hierarchical heteronanostructures of ZnO nanorods/ZnS·(HDA)0.5 (HDA = 1,6-hexanediamine) hybrid nanoplates on a zinc substrate are successfully synthesized on a large scale by combining hydrothermal growth (for ZnO nanorods) and liquid chemical conversion (for ZnS·(HDA)0.5 nanoplates) techniques. The formation of ZnS·(HDA)0.5 hybrid nanoplates branches takes advantage of the preferential binding of 1,6-hexanediamine on specific facets of ZnS, which makes the thickening rate much lower than the lateral growth rate. The ZnS·(HDA)0.5 hybrid nanoplates have a layered structure with 1,6-hexanediamine inserted into interlayers of wurtzite ZnS through the bonding of nitrogen. The number density and thickness of the secondary ZnS·(HDA)0.5 nanoplates can be conveniently engineered by variation of the sulfur source and straightforward adjustment of reactant concentrations such as 1,6-hexanediamine and the sulfur source. The fabricated ZnO/ZnS·(HDA)0.5 heteronanostructures show improved electrochemical catalytic properties for hydrazine compared with the primary ZnO nanorods. Due to its simplicity and efficiency, this approach could be similarly used to fabricate varieties of hybrid heterostructures made of materials with an intrinsic large lattice mismatch.

  7. Magnetic behaviour of hydrogenated La_0_._5Ca_0_._5MnO_3

    International Nuclear Information System (INIS)

    Lal, Ganesh; Punia, Khushboo; Kumar, Sudhish; Jyoti; Dolia, S.N.

    2016-01-01

    The half doped manganite La_0_._5Ca_0_._5MnO_3 have attracted considerable attention owing to its complex electrical and magnetic properties. This work is focused on the effects of hydrogenation on the magnetic behaviour of La_0_._5Ca_0_._5MnO_3. For hydrogenation the La_0_._5Ca_0_._5MnO_3 sample was annealed in a hydrogen atmosphere at 600°C for 6 hours in a reduction furnace and for reducing hydrogen the sample was heated in air at 600°C for 6 hours in a chamber furnace. Room temperature X-ray diffraction studies confirmed that the hydrogenation and annealing of the sample in air does not affect the single phase orthorhombic structure of La_0_._5Ca_0_._5MnO_3. These observations indicate that magnetic behaviour of La_0_._5Ca_0_._5MnO_3. can be tailored by hydrogenation

  8. Edwin I. Hatch Nuclear Plant, Unit 1. Semiannual operating report, September 12--December 31, 1974

    International Nuclear Information System (INIS)

    1974-01-01

    Hatch-1 achieved initial criticality on September 12, 1974, and initial synchronization on November 11, 1974. The unit is a BWR of 813 MW(e) and has generated 50,775.6 MWH since September 12 with the generator on line 865.62 hours. Net plant efficiency was 20.88 percent with plant availability of 28.32 percent. Information is presented concerning operations, changes, tests, safety related maintenance, primary coolant chemistry, occupational personnel radiation doses, and radioactive effluent releases. (U.S.)

  9. Synthesis and characterization of the novel rare earth orthophosphates Y{sub 0.5}Er{sub 0.5}PO{sub 4} and Y{sub 0.5}Yb{sub 0.5}PO{sub 4}

    Energy Technology Data Exchange (ETDEWEB)

    Schildhammer, Daniel; Petschnig, Lucas L.; Fuhrmann, Gerda; Heymann, Gunter; Schottenberger, Herwig; Huppertz, Hubert [Innsbruck Univ. (Austria). Inst. fuer Allgemeine, Anorganische und Theoretische Chemie; Tribus, Martina [Innsbruck Univ. (Austria). Inst. fuer Mineralogie und Petrographie

    2016-02-01

    The new mixed rare earth (RE) orthophosphates Y{sub 0.5}Er{sub 0.5}PO{sub 4} and Y{sub 0.5}Yb{sub 0.5}PO{sub 4} were synthesized by a classical solid state reaction in an electrical furnace at 1200 C. As starting materials, the corresponding rare earth oxides and diammonium hydrogen phosphate were used. The powder diffraction analyses revealed that the new compounds Y{sub 0.5}Er{sub 0.5}PO{sub 4} and Y{sub 0.5}Yb{sub 0.5}PO{sub 4} crystallize in a zircon-type structure being isostructural with the rare earth orthophosphate YPO{sub 4}. Y{sub 0.5}Er{sub 0.5}PO{sub 4} and Y{sub 0.5}Yb{sub 0.5}PO{sub 4} crystallize in the tetragonal space group I4{sub 1}/amd (no. 141) with four formula units in the unit cell. The structural parameters based on Rietveld refinements are a = 687.27(2), c = 601.50(2) pm, V = 0.28412(1) nm{sup 3}, R{sub p} = 0.0143, and R{sub wp} = 0.0186 (all data) for Y{sub 0.5}Er{sub 0.5}PO{sub 4} and a = 684.61(2), c = 599.31(2) pm, V = 0.28089(2) nm{sup 3}, R{sub p} = 0.0242, and R{sub wp} = 0.0313 (all data) for Y{sub 0.5}Yb{sub 0.5}PO{sub 4}. Furthermore, the structure of Y{sub 0.5}Er{sub 0.5}PO{sub 4} was refined from single-crystal X-ray diffraction data: a = 687.78(5), c = 601.85(4) pm, V = 0.28470(5) nm{sup 3}, R{sub 1} = 0.0165, and wR{sub 2} = 0.0385 (all data). In both compounds, the rare earth metal ions are eightfold coordinated by oxygen atoms, forming two unique interlocking tetrahedra with two individual RE-O distances. The tetrahedral phosphate groups [PO{sub 4}]{sup 3-} are slightly distorted in both compounds. The individual rare earth ions share a common position (Wyckoff site 4a). The presence of two rare earth ions in the structures of the new orthophosphates Y{sub 0.5}Er{sub 0.5}PO{sub 4} and Y{sub 0.5}Yb{sub 0.5}PO{sub 4} was additionally confirmed by single-crystal EDX spectroscopy revealing a ratio of 1:1.

  10. Remedial investigation/feasibility study work plan for the 100-BC-5 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Tri-Party Agreement requires that the cleanup programs at the Hanford Site integrate the requirements of CERCLA, RCRA, and Washington State's dangerous waste (the state's RCRA-equivalent) program. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  11. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Hanford Missions Programs; Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Process Technology Programs; Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development; Edwards, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development

    2016-07-14

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the

  12. 40 CFR 60.105a - Monitoring of emissions and operations for fluid catalytic cracking units (FCCU) and fluid coking...

    Science.gov (United States)

    2010-07-01

    ..., Catalytic Reforming Units, and Sulfur Recovery Units. (iii) The owner or operator shall install, operate... for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). 60.105a Section 60.105a... and operations for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). (a) FCCU and...

  13. 33 CFR 17.05-1 - Gifts.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Gifts. 17.05-1 Section 17.05-1 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY GENERAL UNITED STATES COAST GUARD GENERAL GIFT FUND Administration § 17.05-1 Gifts. The gifts or bequests may be in money or...

  14. Study 2.6 operations analysis mission characterization

    Science.gov (United States)

    Wolfe, R. R.

    1973-01-01

    An analysis of the current operations concepts of NASA and DoD is presented to determine if alternatives exist which may improve the utilization of resources. The final product is intended to show how sensitive these ground rules and design approaches are relative to the total cost of doing business. The results are comparative in nature, and assess one concept against another as opposed to establishing an absolute cost value for program requirements. An assessment of the mission characteristics is explained to clarify the intent, scope, and direction of this effort to improve the understanding of what is to be accomplished. The characterization of missions is oriented toward grouping missions which may offer potential economic benefits by reducing overall program costs. Program costs include design, development, testing, and engineering, recurring unit costs for logistic vehicles, payload costs. and direct operating costs.

  15. Enhanced candu 6 reactor: status

    International Nuclear Information System (INIS)

    Azeez, S.; Girouard, P.

    2006-01-01

    The CANDU 6 power reactor is visionary in its approach, renowned for its on-power refuelling capability and proven over years of safe, economical and reliable power production. Developed by Atomic Energy of Canada Limited (AECL), the CANDU 6 design offers excellent performance utilizing state-of-the-art technology. The first CANDU 6 plants went into service in the early 1980s as leading edge technology and the design has been continuously advanced to maintain superior performance with an outstanding safety record. The first set of CANDU 6 plants - Gentilly 2 and Point Lepreau in Canada, Embalse in Argentina and Wolsong- Unit 1 in Korea - have been in service for more than 22 years and are still producing electricity at peak performance; to the end of 2004, their average Lifetime Capacity Factor was 83.2%. The newer CANDU 6 units in Romania (Cernavoda 1), Korea (Wolsong-Units 2, 3 and 4) and Qinshan (Phase III- Units 1 and 2) have also been performing at outstanding levels. The average lifetime Capacity Factor of the 10 CANDU 6 operating units around the world has been 87% to the end of 2004. Building on these successes, AECL is committed to the further development of this highly successful design, now focussing on meeting customers' needs for reduced costs, further improvements to plant operation and performance, enhanced safety and incorporating up-to-date technology, as warranted. This has resulted in AECL embarking on improving the CANDU 6 design through an upgraded product termed the ''Enhanced CANDU 6'' (EC6), which incorporates several attractive but proven features that make the CANDU 6 reactor even more economical, safer and easier to operate. Some of the key features that are being incorporated into the EC6 include increasing the plant's power output, shortening the overall project schedule, decreasing the capital cost, dealing with obsolescence issues, optimizing maintenance outages and incorporating lessons learnt through feedback obtained from the

  16. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency's (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter

  17. Adaptation of Professional Skills in the Unit Operations Laboratory

    Science.gov (United States)

    Rende, Deniz; Rende, Sevinc; Baysal, Nihat

    2012-01-01

    We introduce the design of three consecutive unit operations laboratory (UOL) courses that retain the academic rigor of the course while incorporating skills essential for professional careers, such as ability to propose ideas, develop practical solutions, participate in teamwork, meet deadlines, establish communication between technical support…

  18. Development of severe accident management guidance for Younggwang units 5 and 6

    International Nuclear Information System (INIS)

    Lee, K. W.; Beon, C. S.; Kim, M. K.; Hong, S. Y.; Park, K. S.

    2001-01-01

    Severe Accident Management Guidance (SAMG) has been developed for Younggwang Units 5 and 6. It is consisted of Severe Accident Control Room Guideline, Diagnostic Flow Chart, Severe Accident Guideline, Severe Challenge Guideline, TSC Long Term Monitoring, SAMG Termination. Severe Accident Control Room Guideline, which deals with severe accident after finishing Emergency Operation Procedure, consists of acitions before and after TSC actuation. Seven servere accident management strategies are developed. Diagnostic Flow Chart, Severe Accident Guideline, and Severe Challenge Guideline are developed for each strategy, which enables the users to the implementation of strategy easily and systematically. TSC Long Term Monitoring is also developed to monitor long term activities after a particular strategy. Total of 45 set points are developed for decision making during the implementation of the SAMG

  19. 46 CFR 78.05-5 - Charts and nautical publications.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Charts and nautical publications. 78.05-5 Section 78.05... Notice to Mariners and Aids to Navigation § 78.05-5 Charts and nautical publications. As appropriate for... publications necessary. 1 1 For United States vessels in or on the navigable waters of the United States, see...

  20. Initial closed operation of the CELSS Test Facility Engineering Development Unit

    Science.gov (United States)

    Kliss, M.; Blackwell, C.; Zografos, A.; Drews, M.; MacElroy, R.; McKenna, R.; Heyenga, A. G.

    2003-01-01

    As part of the NASA Advanced Life Support Flight Program, a Controlled Ecological Life Support System (CELSS) Test Facility Engineering Development Unit has been constructed and is undergoing initial operational testing at NASA Ames Research Center. The Engineering Development Unit (EDU) is a tightly closed, stringently controlled, ground-based testbed which provides a broad range of environmental conditions under which a variety of CELSS higher plant crops can be grown. Although the EDU was developed primarily to provide near-term engineering data and a realistic determination of the subsystem and system requirements necessary for the fabrication of a comparable flight unit, the EDU has also provided a means to evaluate plant crop productivity and physiology under controlled conditions. This paper describes the initial closed operational testing of the EDU, with emphasis on the hardware performance capabilities. Measured performance data during a 28-day closed operation period are compared with the specified functional requirements, and an example of inferring crop growth parameters from the test data is presented. Plans for future science and technology testing are also discussed. Published by Elsevier Science Ltd on behalf of COSPAR.

  1. 100-HR-1 Operable Unit focused feasibility study report. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Feasibility Study (FS) includes development and screening of alternatives (phases 1 and 2) and the detailed analysis of alternatives (phase 3). This focused feasibility study (FFS) constitutes the phase 3 portion of the FS process. The FFS process is conducted in two stages, a Process Document (DOE-RL 1994a) and an operable unit-specific FFS document, such as this one. The FFS process is performed by implementing a ''plug-in'' style approach as defined in great detail in the Process Document. The objective of this operable unit-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for sites associated with the 100-HR-1 Operable Unit. The IRM candidate waste sites are determined in the limited field investigation. Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  2. Operational behaviour of WWER nuclear power units after Chernobyl accident

    International Nuclear Information System (INIS)

    Milivojevic, S.; Spasojevic, D.

    2000-01-01

    The indicators of effectiveness of WWER operation, in 1987-1998 were analyzed. For three groups of nuclear units (WWER, NPP Kozloduy, NPP Paks), the trends of Indicators flow were established. The comparative analysis of forced outage rate, and load factor of WWERs and nuclear units all in the world was carried out; it gives the general picture of accident influence on the states and the relations of these indicators in considered period (author)

  3. Crystal and magnetic study of the disordered perovskites Ca(Mn0.5Sb0.5)O3 and Ca(Fe0.5Sb0.5)O3

    International Nuclear Information System (INIS)

    Retuerto, M.; Martinez-Lope, M.J.; Garcia-Hernandez, M.; Munoz, A.; Fernandez-Diaz, M.T.; Alonso, J.A.

    2010-01-01

    We have investigated the double perovskites Ca 2 MSbO 6 (M = Mn, Fe) that have been prepared by solid-state reaction (M = Fe) and wet chemistry procedures (M = Mn). The crystal and magnetic structures have been studied from X-ray (XRD) and neutron powder diffraction (NPD) data. Rietveld refinements show that the crystal structures are orthorhombic (space group Pbnm) with complete disorder of M and Sb cations, so the formula should be rewritten as Ca(M 0.5 Sb 0.5 )O 3 . Due to this disorder no evidences of Jahn-Teller distortion can be observed in the MnO 6 octahedra of Ca(Mn 0.5 Sb 0.5 )O 3 , in contrast with the ordered double perovskite Sr 2 MnSbO 6 . Ca(Fe 0.5 Sb 0.5 )O 3 behaves as an antiferromagnet with an ordered magnetic moment for Fe 3+ of 1.53(4)μ B and a propagation vector k = 0, as investigated by low-temperature NPD. The antiferromagnetic ordering is a result of the high degree of Fe/Sb anti-site disorder of the sample, which originates the spontaneous formation of Fe-rich islands, characterized by the presence of strong Fe-O-Fe antiferromagnetic couplings with enough long-range coherence to produce a magnetic contribution perceptible by NPD. By contrast, the magnetic structure of Ca(Mn 0.5 Sb 0.5 )O 3 cannot be observed by low-temperature NPD because the magnitude of the ordered magnetic moments is below the detection threshold for neutrons.

  4. H. B. Robinson Plant, Unit 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit achieved a good performance record through the year, experiencing only short duration shutdowns or power reductions. Information is presented concerning operations, maintenance, shutdowns, and occupational radiation exposures. In November there was a scheduled refueling lasting 40 days. After a start-up physics test program, the unit achieved 100 percent power on December 22, 1976

  5. 40 CFR 62.15145 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 62.15145 Section 62.15145 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operating Requirements § 62.15145 What are the operating practice requirements for my municipal waste combustion unit? (a) You...

  6. Licensed operating reactors: status summary report, data as of May 31, 1983. Volume 7, No. 6

    International Nuclear Information System (INIS)

    1983-06-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  7. Feasibility study report for Operable Unit 4: Volume 2

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP. This volume contains appendices A--E

  8. Safety Evaluation Report related to the operation of Wolf Creek Generating Station, Unit No. 1 (Docket No. STN 50-482). Supplement No. 6

    International Nuclear Information System (INIS)

    1985-06-01

    This report supplements the Safety Evaluation Report (SER) for the application filed by the Kansas Gas and Electric Company, as applicant and agent for the owners, for a license to operate the Wolf Creek Generating Station, Unit 1 (Docket No. STN 50-482). The facility is located in Coffey County, Kansas. This supplement provides recent information regarding resolution of the license conditions identified in the SER. Because of the favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the licensee at power levels greater than 5% without endangering the health and safety of the public

  9. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    International Nuclear Information System (INIS)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  10. An Appraisal Of The Operation And Management Of Unit Trust ...

    African Journals Online (AJOL)

    An Appraisal Of The Operation And Management Of Unit Trust Schemes In Nigeria. ... Open Access DOWNLOAD FULL TEXT ... instead of being invested in shares or in money market instruments as a result of widespread financial illiteracy.

  11. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are 99 Tc and 60 Co for underwater affected by past discharges to the 216-BY Cribs, and 90 Sr, 239/240 Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes

  12. Control technique for enhancing the stable operation of distributed generation units within a microgrid

    International Nuclear Information System (INIS)

    Mehrasa, Majid; Pouresmaeil, Edris; Mehrjerdi, Hasan; Jørgensen, Bo Nørregaard; Catalão, João P.S.

    2015-01-01

    Highlights: • A control technique for enhancing the stable operation of distributed generation units is proposed. • Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors. • The compensation of instantaneous variations in the reference current components is considered. • Simulation results confirm the performance of the control scheme within the microgrid. - Abstract: This paper describes a control technique for enhancing the stable operation of distributed generation (DG) units based on renewable energy sources, during islanding and grid-connected modes. The Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors of DG units during integration and power sharing with loads and/or power grid, which is an appropriate tool to analyze and define a stable operating condition for DG units in microgrid technology. The compensation of instantaneous variations in the reference current components of DG units in ac-side, and dc-link voltage variations in dc-side of interfaced converters, are considered properly in the control loop of DG units, which is the main contribution and novelty of this control technique over other control strategies. By using the proposed control technique, DG units can provide the continuous injection of active power from DG sources to the local loads and/or utility grid. Moreover, by setting appropriate reference current components in the control loop of DG units, reactive power and harmonic current components of loads can be supplied during the islanding and grid-connected modes with a fast dynamic response. Simulation results confirm the performance of the control scheme within the microgrid during dynamic and steady-state operating conditions

  13. 6 CFR 13.45 - Deposit in Treasury of United States.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Deposit in Treasury of United States. 13.45 Section 13.45 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY PROGRAM FRAUD CIVIL REMEDIES § 13.45 Deposit in Treasury of United States. All amounts collected pursuant to this part...

  14. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  15. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  16. RCRA facility investigation/corrective measures study work plan for the 100-HR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-1 source operable unit. Source operable units include facilities and unplanned release sites that are potential sources of contamination. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Separate work plans have been initiated for the 100-HR-3 groundwater operable unit (DOE-RL 1992a) and the 100-DR-1 (DOE-RL 1992b) source operable units

  17. Intraoperative appearance of the resection area in brain-tumor operations in an open 0,5 MRT; Intraoperatives Erscheinungsbild des Resektionsbereichs bei Hirntumoroperationen in einem offenen 0,5-T-MRT

    Energy Technology Data Exchange (ETDEWEB)

    Dietrich, J. [Universitaetsklinik fuer Diagnostische Radiologie, Leipzig (Germany). Arbeitsbereich Neuroradiologie; Schneider, J.P.; Schulz, T. [Universitaetsklinik fuer Diagnostische Radiologie, Leipzig (Germany); Seifert, V.; Trantakis, C. [Universitaetsklinik fuer Neurochirurgie, Leipzig (Germany); Kellermann, S. [Leipzig Univ. (Germany). Abt. fuer Neuropathologie

    1998-11-01

    During MRI-controlled resection of brain tumors using an open MRI system, operation-induced alterations may occur, especially enhancement of the resection cavity wall. This may simulate tumor areas, resulting in false assessment of the resection or resection of non-tumorous areas. Based on 42 MRI- and biopsy-controlled brain tumor resections in an 0.5 T open MRI (Signa SP, GE), the appearance and origin of operation-induced reactions are analyzed. In our opinion, there is a superposition of preformed peritumoral reactions by operation-induced microcontusions. The beginning of the cavity wall enhancement needs at least 10-15 min. MRI-controlled analysis of the intraoperative steps by the neurosurgeon and neuroradiologist allows discrimination of operation-induced reactions from tumor areas and leads to safe operation. (orig.) [Deutsch] Bei der intraoperativen Kontrolle von Hirntumorresektionen in offenen MRT-Geraeten kann es zu operativ induzierten Veraenderungen, insbesondere Rand-enhancement-Zonen, kommen. Diese koennen Tumorreste vortaeuschen, so dass die Radikalitaet des Eingriffs unterschaetzt wird oder nicht tumortragende Hirnareale entfernt werden. Ergebnisse und Diskussion: Anhand von 42 in einem offenen 0,5-T-MRT (Signa SP, GE) vorgenommenen, biopsiekontrollierten Hirntumoroperationen werden Erscheinungsbild und Entstehungsweise der Randveraenderungen analysiert. Bei den haeufig vorzufindenden Rand-enhancement-Zonen handelt es sich um eine Ueberlagerung von praeformierten Tumorrandreaktionen mit Mikrokontusionen. Die Ausbildung dieser Veraenderungen braucht eine Mindestzeit von 10-15 min. Die staendige Analyse der die Tumorresektion begleitenden MRT-Kontrollen durch den Operateur und einen mit der Problematik vertrauten Radiologen gestattet in der Regel die Differenzierung der operativ induzierten Veraenderungen und erhoeht damit die Sicherheit des Eingriffs. (orig.)

  18. 12 CFR 932.6 - Operations risk capital requirement.

    Science.gov (United States)

    2010-01-01

    ... operations risk capital requirement shall at all times equal 30 percent of the sum of the Bank's credit risk... percent but no less than 10 percent of the sum of the Bank's credit risk capital requirement and market... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Operations risk capital requirement. 932.6...

  19. Turkey Point Plant, Units 3 and 4. Semiannual operating report No. 6, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Net electrical power generated by Unit 3 was 2,676,523 MWH(e) with the plant on line 4,148.8 hrs. Unit 4 generated 1,429,108 MWH(e) and was on line 2,232.0 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental radiation monitoring. (FS)

  20. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    Science.gov (United States)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  1. 19 CFR 212.05 - Standards for awards.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Standards for awards. 212.05 Section 212.05 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE IMPLEMENTATION OF THE EQUAL ACCESS TO JUSTICE ACT General Provisions § 212.05 Standards for awards...

  2. On Point: The United States Army in Operation Iraqi Freedom

    Science.gov (United States)

    2004-01-01

    to retain operational context. Moreover, times noted in the text have been adjusted from Greenwich Mean Time (“ Zulu ”) to local Kuwait time (+ 3...TF 1-64 AR unit history is composed of short narratives for each subordinate unit. Most cite times in zulu . 34. Ibid. 35. Ibid. Numbers of enemy...places in the world. Inside the city cemetery is the Tomb of Ali, son-in-law and cousin to Mohammed and founder of the Shiite sect. Coalition leaders

  3. Experimental determinations of the turbine condenser operation at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Romascu, Gabriel; Dragusin, Dumitru; Rogociu, Ioan; Macodean, Luminita; Marciulescu, George

    1999-01-01

    The condenser system represents one of the most important BOP (balance of plant) systems of the CANDU 700 MW Unit at Cernavoda NPP. The paper presents theoretical calculation elements, mathematical model for simulation of condenser operation and the results obtained by model implementation as compared to operation data. The model could be adapted to other turbine and operation regime types. (authors)

  4. Comparison of evening and morning dosing of travoprost 0.004%/timolol 0.5% fixed combination in 6 month period.

    Science.gov (United States)

    Suić, Smiljka Popović; Laus, Katia Novak; Dosen, Vukosava Maricic; Ekert, Miroslav; Mandić, Zdravko; Bojić, Lovro

    2010-09-01

    An open label, multi-center, 6 months observational study of new fixed combination (travoprost 0.004%/timolol 0.5%), in order to evaluate both efficacy (intraocular pressure lowering) and tolerability (patient and investigator satisfaction) of two dosing regimens--evening (PM) and morning (AM). After screening for enrollment, to 40 patients (79 eyes with primary open angle glaucoma or ocular hypertension), new fixed combination travoprost 0.004%/timolol 0.5% was prescribed once a day in the evening (PM). Patients were enrolled according to each investigator decision on indication for travoprost 0.004%/timolol 0.5% fixed combination once a day, without washout period after previous medication. Intraocular pressure was measured at 9 AM at all time control points: at baseline, after 1 month, after 3 months and after 6 month. After 1 month, screening for nonresponders (criteria: 20% intraocular pressure lowering) and subjects with major side effects was performed. At second control visit, after 3 months PM dosing, intraocular pressure was measured and patients were instructed to continue once a day the same medication, but in the morning (AM) for consequent 3 months. After 1 month, reduction in mean intraocular pressure value was 21.66%. At the visit after 3 month, the mean intraocular pressure was 15.67 +/- 2.17 mm Hg (reduction 21.14%). 3 month after dosing regimen changed to AM (6 month after beginning of travoprost 0.004%/timolol 0.5% combination therapy), reduction in intraocular pressure value was 19.86%. The differences (mean +/- standard deviation) in intraocular pressure values after 1, 3 and 6 month were all highly statistically significant compared to baseline values. The tolerability was evaluated in five steps (Likert scale) ranging from unsatisfactory to excellent by both patient and investigator--taken at 3 and 6 month control visit. 95% of patients and 100% of investigators were satisfied with the possibility of choosing dosing regimen for travoprost 0

  5. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Unit 2 (Docket No. 50-446)

    International Nuclear Information System (INIS)

    1992-09-01

    This document supplement 25 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Unit 2 (NUREG-0797), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved when the Safety Evaluation Report and Supplements 1, 2, 3, 4, 6, 12, 21, 22, 23, and 24 to that report were published. This supplement deals primarily with Unit 2 issues; however, it also references evaluations for several Unit 1 licensing items resolved since Supplement 24 was issued

  6. Survey method for radiological surveys of 300 FF-1 Operable Unit soil and materials

    International Nuclear Information System (INIS)

    Greif, A.A.

    1997-06-01

    This technical basis document is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by the Radiological Control Technician to determine if excavated areas require continued remediation in accordance with the Record of Decision for the operable unit

  7. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1. Volume 5: Analysis of core damage frequency from seismic events during mid-loop operations

    International Nuclear Information System (INIS)

    Budnitz, R.J.; Davis, P.R.; Ravindra, M.K.; Tong, W.H.

    1994-08-01

    In 1989 the US Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1) and the other at Sandia National Laboratories studying a boiling water reactor (Grand Gulf). Both the Brookhaven and Sandia projects have examined only accidents initiated by internal plant faults--so-called ''internal initiators.'' This project, which has explored the likelihood of seismic-initiated core damage accidents during refueling shutdown conditions, is complementary to the internal-initiator analyses at Brookhaven and Sandia. This report covers the seismic analysis at Surry Unit 1. All of the many systems modeling assumptions, component non-seismic failure rates, and human error rates that were used in the internal-initiator study at Surry have been adopted here, so that the results of the two studies can be as comparable as possible. Both the Brookhaven study and this study examine only two shutdown plant operating states (POSs) during refueling outages at Surry, called POS 6 and POS 10, which represent mid-loop operation before and after refueling, respectively. This analysis has been limited to work analogous to a level-1 seismic PRA, in which estimates have been developed for the core-damage frequency from seismic events during POSs 6 and 10. The results of the analysis are that the core-damage frequency of earthquake-initiated accidents during refueling outages in POS 6 and POS 10 is found to be low in absolute terms, less than 10 -6 /year

  8. The role of heat pipes in intensified unit operations

    International Nuclear Information System (INIS)

    Reay, David; Harvey, Adam

    2013-01-01

    Heat pipes are heat transfer devices that rely, most commonly, on the evaporation and condensation of a working fluid contained within them, with passive pumping of the condensate back to the evaporator. They are sometimes referred to as ‘thermal superconductors’ because of their exceptionally high effective thermal conductivity (substantially higher than any metal). This, together with several other characteristics make them attractive to a range of intensified unit operations, particularly reactors. The majority of modern computers deploy heat pipes for cooling of the CPU. The application areas of heat pipes come within a number of broad groups, each of which describes a property of the heat pipe. The ones particularly relevant to chemical reactors are: i. Separation of heat source and sink. ii. Temperature flattening, or isothermalisation. iii. Temperature control. Chemical reactors, as a heat pipe application area, highlight the benefits of the heat pipe based on isothermalisation/temperature flattening device and on being a highly effective heat transfer unit. Temperature control, done passively, is also of relevance. Heat pipe technology offers a number of potential benefits to reactor performance and operation. The aim of increased yield of high purity, high added value chemicals means less waste and higher profitability. Other intensified unit operations, such as those employing sorption processes, can also profit from heat pipe technology. This paper describes several variants of heat pipe and the opportunities for their use in intensified plant, and will give some current examples. -- Highlights: ► Heat pipes – thermal superconductors – can lead to improved chemical reactor performance. ► Isothermalisation within a reactor vessel is an ideal application. ► The variable conductance heat pipe can control reaction temperatures within close limits. ► Heat pipes can be beneficial in intensified reactors

  9. Integrating UF6 Cylinder RF Tracking With Continuous Load Cell Monitoring for Verifying Declared UF6 Feed and Withdrawal Operations Verifying Declared UF6 Feed and Withdrawal Operations

    International Nuclear Information System (INIS)

    Krichinsky, Alan M.; Miller, Paul; Pickett, Chris A.; Richardson, Dave; Rowe, Nathan C.; Whitaker, J. Michael; Younkin, James R.

    2009-01-01

    Oak Ridge National Laboratory is demonstrating the integration of UF6 cylinder tracking, using RF technology, with continuous load cell monitoring (CLCM) at mock UF6 feed and withdrawal (F and W) stations. CLCM and cylinder tracking are two of several continuous-monitoring technologies that show promise in providing integrated safeguards of F and W operations at enrichment plants. Integrating different monitoring technologies allows advanced, automated event processing to screen innocuous events thereby minimizing false alerts to independent inspectors. Traditionally, international inspectors rely on batch verification of material inputs and outputs derived from operator declarations and periodic on-site inspections at uranium enrichment plants or other nuclear processing facilities. Continuously monitoring F and W activities between inspections while providing filtered alerts of significant operational events will substantially increase the amount of valuable information available to inspectors thereby promising to enhance the effectiveness of safeguards and to improve efficiency in conducting on-site inspections especially at large plants for ensuring that all operations are declared.

  10. Remedial investigation/feasibility study work plan for the 100-KR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-1 operable unit. The 100-KR-1 source operable unit is one of three source operable units in the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination

  11. PREMATH: a Precious-Material Holdup Estimator for unit operations and chemical processes

    International Nuclear Information System (INIS)

    Krichinsky, A.M.; Bruns, D.D.

    1982-01-01

    A computer program, PREMATH (Precious Material Holdup Estimator), has been developed to permit inventory estimation in vessels involved in unit operations and chemical processes. This program has been implemented in an operating nuclear fuel processing plant. PREMATH's purpose is to provide steady-state composition estimates for material residing in process vessels until representative samples can be obtained and chemical analyses can be performed. Since these compositions are used for inventory estimation, the results are determined for and cataloged in container-oriented files. The estimated compositions represent material collected in applicable vessels - including consideration for material previously acknowledged in these vessels. The program utilizes process measurements and simple material balance models to estimate material holdups and distribution within unit operations. During simulated run testing, PREMATH-estimated inventories typically produced material balances within 7% of the associated measured material balances for uranium and within 16% of the associated, measured material balances for thorium (a less valuable material than uranium) during steady-state process operation

  12. NUMATH: a nuclear-material-holdup estimator for unit operations and chemical processes

    International Nuclear Information System (INIS)

    Krichinsky, A.M.

    1981-01-01

    A computer program, NUMATH (Nuclear Material Holdup Estimator), has been developed to permit inventory estimation in vessels involved in unit operations and chemical processes. This program has been implemented in an operating nuclear fuel processing plant. NUMATH's purpose is to provide steady-state composition estimates for material residing in process vessels until representative samples can be obtained and chemical analyses can be performed. Since these compositions are used for inventory estimation, the results are determined for and cataloged in container-oriented files. The estimated compositions represent material collected in applicable vessels-including consideration for material previously acknowledged in these vessels. The program utilizes process measurements and simple material balance models to estimate material holdups and distribution within unit operations. During simulated run testing, NUMATH-estimated inventories typically produced material balances within 7% of the associated measured material balances for uranium and within 16% of the associated, measured material balance for thorium during steady-state process operation

  13. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  14. Incidence of surgical site infection with pre-operative skin preparation using 10% polyvidone-iodine and 0.5% chlorhexidine-alcohol.

    Science.gov (United States)

    Rodrigues, Ana Luzia; Simões, Maria de Lourdes Pessole Biondo

    2013-01-01

    To analyze the incidence of surgical site infection when the preoperative skin preparation was performed with 10% povidone-iodine and 0.5% chlorhexidine-alcohol. We conducted a randomized, longitudinal study based on variables obtained from patients undergoing clean and potentially contaminated operations. Those involved were divided into two groups. In group 1 (G1) we included 102 patients with skin prepared with povidone-iodine, and in group 2 (G2), 103, whose skin was prepared with chlorhexidine. In the third, seventh and 30th postoperative days we evaluated the surgical site, searching for signs of infection. Data related to clinical profile, such as diabetes mellitus, smoking, alcoholism, haematological data (Hb, VG and leukocytes), age and gender, and the related variables, such as number of days of preoperative hospitalization, shaving, topography of incision, antibiotic prophylaxis and resident participation in the operation were not predisposing factors for surgical site infection. Two patients in G1 and eight in G2 undergoing clean operations had some type of infection (p = 0.1789), five in G1 and three in G2 undergoing potentially contaminated operations had some type of infection (p = 0.7205). The incidence of surgical site infection in operations classified as clean and as potentially contaminated for which skin preparation was done with 10% povidone-iodine and 0.5% chlorhexidine-alcohol was similar.

  15. Safety Evaluation Report related to the operation of Cartawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414). Supplement No. 5

    International Nuclear Information System (INIS)

    1986-02-01

    This report supplements the Safety Evaluation Report (NUREG-0954) issued in February 1983 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, Saluda River Electric Cooperative, Inc., and Piedmont Municipal Power Agency, as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. This supplement provides additional information supporting the license for initial criticality and power ascension to full-power operation for Unit 2

  16. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  17. Parallel charge sheets of electron liquid and gas in La0.5Sr0.5TiO3/SrTiO3 heterostructures

    Science.gov (United States)

    Renshaw Wang, X.; Sun, L.; Huang, Z.; Lü, W. M.; Motapothula, M.; Annadi, A.; Liu, Z. Q.; Zeng, S. W.; Venkatesan, T.; Ariando

    2015-12-01

    We show here a new phenomenon in La0.5Sr0.5TiO3/SrTiO3 (LSTO/STO) heterostructures; that is a coexistence of three-dimensional electron liquid (3DEL) and 2D electron gas (2DEG), separated by an intervening insulating LSTO layer. The two types of carriers were revealed through multi-channel analysis of the evolution of nonlinear Hall effect as a function of film thickness, temperature and back gate voltage. We demonstrate that the 3D electron originates from La doping in LSTO film and the 2D electron at the surface of STO is due to the polar field in the intervening insulating layer. As the film thickness is reduced below a critical thickness of 6 unit cells (uc), an abrupt metal-to-insulator transition (MIT) occurs without an intermediate semiconducting state. The properties of the LSTO layer grown on different substrates suggest that the insulating phase of the intervening layer is a result of interface strain induced by the lattice mismatch between the film and substrate. Further, by fitting the magnetoresistance (MR) curves, the 6 unit cell thick LSTO is shown to exhibit spin-orbital coupling. These observations point to new functionalities, in addition to magnetism and superconductivity in STO-based systems, which could be exploited in a multifunctional context.

  18. Smart house-based optimal operation of thermal unit commitment for a smart grid considering transmission constraints

    Science.gov (United States)

    Howlader, Harun Or Rashid; Matayoshi, Hidehito; Noorzad, Ahmad Samim; Muarapaz, Cirio Celestino; Senjyu, Tomonobu

    2018-05-01

    This paper presents a smart house-based power system for thermal unit commitment programme. The proposed power system consists of smart houses, renewable energy plants and conventional thermal units. The transmission constraints are considered for the proposed system. The generated power of the large capacity renewable energy plant leads to the violated transmission constraints in the thermal unit commitment programme, therefore, the transmission constraint should be considered. This paper focuses on the optimal operation of the thermal units incorporated with controllable loads such as Electrical Vehicle and Heat Pump water heater of the smart houses. The proposed method is compared with the power flow in thermal units operation without controllable loads and the optimal operation without the transmission constraints. Simulation results show the validation of the proposed method.

  19. Heat recovery unit operation of HVAC system in IMEF

    International Nuclear Information System (INIS)

    Paek, S. R.; Oh, Y. W.; Song, E. S.; Park, D. K.; Joo, Y. S.; Hong, K. P.

    2003-01-01

    HVAC system including a supply and exhaust air system in IMEF(Irradiated Materials Examination Facility) is an essential facility for preventing a leakage of radioactive materials and for a preservation of a working environment. It costs a lot to operate the HVAC system in IMEF because our ventilation type is once-through system, and an air flow is maintained from low level contamination area to high level and maintained high turns of ventilation air under certain conditions. As HRU(Heat Recovery Unit) at HVAC system based on PIEF(Post Irradiation Examination Facility) operation experiences is designed and adopted, it prevents from a heating coil freezing destruction in winter and makes much energy saving etc.. Heat pipe type HRU is adopted in IMEF, and a construction and operation result of HRU is examined

  20. Denver Radium Site -- Operable Unit I closeout report for the US Environmental Protection Agency

    International Nuclear Information System (INIS)

    1992-08-01

    The Denver Radium Site consists of properties in the Denver, Colorado, area having radioactive contamination left from radium processing in the early 1900s. The properties are divided into 11 gaps or operable units to facilitate remedial action of the Site. Operable Unit I is an 8-acre block bounded by Quivas Street to the east, Shoshone Street to the west, West 12th Avenue to the south, and West 13th Avenue to the north. The primary focus of interest concerning investigations of radiological contamination was a radium, vanadium, and uranium processing facility at 1201 Quivas Street owned by the Pittsburgh Radium Company (PRC) from 1925 until 1926. The Radium Ores Company, which was associated with PRC, operated the facility until 1927. A Remedial investigation (RI) of Operable Unit I was prepared by Jacobs Engineering Group and CH 2 M Hill on behalf of EPA in April 1986. The draft Feasibility Study (FS), prepared by Jacobs Engineering Group and CH 2 M Hill, was issued in July 1987 (the final FS is the Community Relations Responsiveness Summary with an errata to the draft, issued September 1987). The RI focused on radium uranium processing residues discarded in the early 1900s. These residues contained uranium, radium, and thorium. EPA s Community Relations Plan involved the community in the decision-making process relating to the remedy to be implemented at Operable Unit X, and promoted communications among interested parties throughout the course of the project. The remedial action alternative preferred by EPA for Operable Unit I was Off-Site Permanent Disposal. Because a permanent disposal facility was not available at the time the Record of Decision was issued in September 1987, EPA selected the On-Site Temporary Containment (capping) with the Off-Site Permanent Disposal alternative

  1. 40 CFR 60.2989 - Does this subpart directly affect incineration unit owners and operators in my State?

    Science.gov (United States)

    2010-07-01

    ... incineration unit owners and operators in my State? 60.2989 Section 60.2989 Protection of Environment... SOURCES Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units That Commenced... incineration unit owners and operators in my State? (a) No, this subpart does not directly affect incineration...

  2. 78 FR 14361 - U.S. Steel Tubular Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United...

    Science.gov (United States)

    2013-03-05

    ... Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United States Steel Corporation, Mckeesport, PA; Notice of Initiation of Investigation To Terminate Certification of Eligibility Pursuant to... Tubular Products, McKeesport Tubular Operations Division, Subsidiary of United States Steel Corporation...

  3. Operation experience of the advanced fuel assemblies at Unit 1 of Volgodonsk NPP within four fuel cycles

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kobelev, S.; Kushmanov, S.

    2006-01-01

    The first commissioning of Volgodonsk NPP Unit 1 with standard reactor WWER-1000 (project V-320) was in 2001. The reactor core, starting from the first fuel charge, was arranged completely with Advanced Fuel Assemblies (AFAs). In this way, it is possible to obtain the experience in startup and operation of the core, completely arranged with AFAs, and also to get a possibility of performing the comprehensive check for justification of newly commissioned units and justification of design solutions accepted in the design of reactor core for Taiwan NPP, Bushehr NPP and Kudankulam NPP. The first fuel charge of the Volgodonsk NPP Unit 1 is a reference and unified for Tiawan NPP (V-428), Bushehr NPP (V-446), Kudankulam NPP(V-412) with small differences caused by design features of RP V-320. The first core charge of Unit 1 of Volgodonsk NPP was arranged of 163 AFAs, comprising 61 CPS ARs and 42 BAR bundles. The subsequent fuel charges were arranged of AFAs with gadolinium oxide integrated into fuel instead of BAR. By 2005 the results of operation of the core at Unit 1 of Volgodonsk NPP during four fuel cycles showed that AFA is sufficiently reliable and serviceable. The activity of the primary coolant of the Volgodonsk NPP is at stable low level. During the whole time of the core operation of the Volgodonsk NPP Unit 1 no leaky AFAs were revealed. The modifications of the internals, made during pre-operational work, are reasonable and effective to provide for fuel mechanical stability in the course of operation. The modifications, made in AFA structure during operation of the Volgodonsk NPP Unit 1, are aimed at improving the service and operational reliability of its components. Correctness of the solutions taken is confirmed by AFAs operation experience both at the Volgodonsk NPP, and at other operating Russian NPPs

  4. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1

    International Nuclear Information System (INIS)

    Brown, T.D.; Kmetyk, L.N.; Whitehead, D.; Miller, L.; Forester, J.; Johnson, J.

    1995-03-01

    Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively

  5. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Brown, T.D.; Kmetyk, L.N.; Whitehead, D.; Miller, L. [Sandia National Labs., Albuquerque, NM (United States); Forester, J. [Science Applications International Corp., Albuquerque, NM (United States); Johnson, J. [GRAM, Inc., Albuquerque, NM (United States)

    1995-03-01

    Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively.

  6. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    International Nuclear Information System (INIS)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-01-01

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed

  7. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    Energy Technology Data Exchange (ETDEWEB)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-05-22

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed.

  8. On the novel double perovskites A2Fe(Mn0.5W0.5)O6 (A= Ca, Sr, Ba). Structural evolution and magnetism from neutron diffraction data

    Science.gov (United States)

    García-Ramos, Crisanto A.; Larrégola, Sebastián; Retuerto, María; Fernández-Díaz, María Teresa; Krezhov, Kiril; Alonso, José Antonio

    2018-06-01

    New A2Fe(Mn0.5W0.5)O6 (A = Ca, Sr, Ba) double perovskite oxides have been prepared by ceramic techniques. X-ray diffraction (XRD) complemented with neutron powder diffraction (NPD) indicate a structural evolution from monoclinic (space group P21/n) for A = Ca to cubic (Fm-3m) for A = Sr and finally to hexagonal (P63/mmc) for A = Ba as the perovskite tolerance factor increases with the A2+ ionic size. The three oxides present different tilting schemes of the FeO6 and (Mn,W)O6 octahedra. NPD data also show evidence in all cases of a considerable anti-site disordering, involving the partial occupancy of Fe positions by Mn atoms, and vice-versa. Magnetic susceptibility data show magnetic transitions below 50 K characterized by a strong irreversibility between ZFC and FC susceptibility curves. The A = Ca perovskite shows a G-type magnetic structure, with weak ordered magnetic moments due to the mentioned antisite disordering. Interesting magnetostrictive effects are observed for the Sr perovskite below 10 K.

  9. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Unit 2 (Docket No. 50-446)

    International Nuclear Information System (INIS)

    1993-02-01

    Supplement 26 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Unit 2, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved when the Safety Evaluation Report and Supplements 1, 2, 3, 4, 6, 12, 21, 22, 23, 24, and 25 to that report were published. This supplement deals primarily with Unit 2 issues; however, it also references evaluations for several licensing issues that relate to Unit 1, which have been resolved since Supplement 25 was issued

  10. 40 CFR 60.1200 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 60.1200 Section 60.1200 Protection of Environment... SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is... Good Combustion Practices: Operating Requirements § 60.1200 What are the operating practice...

  11. Reservoir release patterns for hydropower operations at the Aspinall Unit on the Gunnison River, Colorado

    International Nuclear Information System (INIS)

    Yin, S.C.L.; Sedlacek, J.

    1995-05-01

    This report presents the development of reservoir release patterns for the Aspinall Unit, which includes Blue Mesa, Morrow Point, and Crystal Reservoirs on the Gunnison River in Colorado. Release patterns were assessed for two hydropower operational scenarios--seasonally adjusted steady flows and seasonally adjusted high fluctuating flows--and three representative hydrologic years--moderate (1987), dry (1989), and wet (1983). The release patterns for the operational scenarios were developed with the aid of monthly, daily, and hourly reservoir operational models, which simulate the linked operation of the three Aspinall Unit reservoirs. Also presented are reservoir fluctuations and downstream water surface elevations corresponding to the reservoir release patterns. Both of the hydropower operational scenarios evaluated are based on the ecological research flows proposed by the US Fish and Wildlife Service for the Aspinall Unit. The first operational scenario allows only seasonally adjusted steady flows (no hourly fluctuations at any dam within one day), whereas the second scenario permits high fluctuating flows from Blue Mesa and Morrow Point Reservoirs during certain times of the year. Crystal Reservoir would release a steady flow within each day under both operational scenarios

  12. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.J.

    1980-07-01

    The NRC plan defines the functional role of the NRC in cleanup operations at Three Mile Island Unit 2 to assure that agency regulatory responsibilities and objectives will be fulfilled. The plan outlines NRC functions in TMI-2 cleanup operations in the following areas: (1) the functional relationship of NRC to other government agencies, the public, and the licensee to coordinate activities, (2) the functional roles of these organizations in cleanup operations, (3) the NRC review and decision-making procedure for the licensee's proposed cleanup operation, (4) the NRC/licensee estimated schedule of major actions, and (5) NRC's functional role in overseeing implementation of approved licensee activities

  13. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  14. Development of Regulatory Audit Programs for Wolsong Unit 1 Continued Operation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hong Key; Nho, Seung Hwan; Song, Myung Ho [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2012-05-15

    Wolsong Unit 1 (PHWR type) design life expires on November 20, 2010. In relation to it, KHNP submitted its application to get approval of the MEST on December 30, 2009 and KINS is under review to confirm the appropriateness of continued operation. For the comprehensive review of Wolsong Unit 1 continued operation, KINS has developed the review guidelines for PHWR type reactor including a total of 39 aging management program (AMP) items and 7 time limited aging analysis (TLAA) items. Evaluations or calculations to verify the integrity of nuclear components are required for plant specific AMP and TLAA items as well as the ones specified in the guidelines. In this paper, audit calculation programs developed for KINS staff use in reviewing applicant's submitted evaluation results are presented

  15. Indian Point Station, Units 1, 2, and 3. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 remained in a shutdown condition pending a decision by the Company on the installation of an ECCS as required by NRC. Net electrical power generated by Unit 2 was 2,267,654 MWH with the unit on line 3,056.45 hrs. Unit 3 generated 1,872,947 MWH and was on line 2,286.01 hrs. Information is presented concerning operations, reportable events, corrective maintenance, fuel performance, radioactivity releases, shutdowns, primary coolant chemistry, and occupational radiation exposures

  16. Application effects of dexmedetomidine combined with sevoflurane for anesthesia in short operations in children with burn injury

    Directory of Open Access Journals (Sweden)

    Jin-xin WANG

    2016-04-01

    Full Text Available Objective  To evaluate the effectiveness and safety of dexmedetomidine combined with sevoflurane for anesthesia in short operations in pediatric burn patients. Methods  Forty hospitalized children undergoing short operation for burn injury were allocated to sevoflurane group (S group or sevoflurane combined dexmedetomidine group (group D(20 patients each. Children in group D inhaled 8% sevoflurane in the beginning until loss of eyelash reflex, and then the density of sevoflurane was reduced to 3% for maintenance, 5μg/(kg.h of dexmedetomidine was pumped for 10 mins, then the density was reduced to 0.5μg/(kg.h. Then operation was started herewith till to the end. Children in group S received sevoflurane anethesia alone, and dexmedetomidine was replaced by the same volume of physiological saline. Additional 3mg/kg propofol was injected when anesthesia was inadequate. During the procedure, HR, MAP, SpO2 and Ramsay scale were recorded at baseline (T1, loss of eyelash reflex (T2, 5min after the start of operation (T4, 10min (T5 and the end of operation (T6. The operation time, anethesia time, propofol consumption, case of respiratory depression and pediatric anesthesia emergence delirium scale (PAED in pediatric anesthesia care unit (PACU were recorded. Results  There was no significant difference in operation time between the two groups. Intraoperative SpO2 was higher in group D than in group S (P<0.05, respiratory inhibition occurred in 4 cases of group D and 10 cases of group S (P<0.05. Propofol consumption was less and the operation time was longer in group D than in group S (P<0.05. At T3-T6, the MAP and HR were lower, but the Ramsay scale was higher in group D than in group S (P<0.05. In PACU, PAED scale was lower in group D than in group S (P<0.05. Conclusions  Dexmedetomidine combined with sevoflurane for anesthesia for short burn surgery in children not only stabilize hemodynamic parameters but also reduce the impact to respiration

  17. Modernization program of NPP Kozloduy, units 5 and 6

    International Nuclear Information System (INIS)

    Protze, M.

    2000-01-01

    A rather brief overview is given of the programme for upgrading units 5 and 6 of the Bulgarian Kozloduy plant, as it was established in 1994/95. A brief characterization is given of individual steps, either already taken or being planned. (A.K.)

  18. 28 CFR 0.5 - Attorney General.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Attorney General. 0.5 Section 0.5... Attorney General § 0.5 Attorney General. The Attorney General shall: (a) Supervise and direct the administration and operation of the Department of Justice, including the offices of U.S. Attorneys and U.S...

  19. Advanced Transport Operating System (ATOPS) control display unit software description

    Science.gov (United States)

    Slominski, Christopher J.; Parks, Mark A.; Debure, Kelly R.; Heaphy, William J.

    1992-01-01

    The software created for the Control Display Units (CDUs), used for the Advanced Transport Operating Systems (ATOPS) project, on the Transport Systems Research Vehicle (TSRV) is described. Module descriptions are presented in a standardized format which contains module purpose, calling sequence, a detailed description, and global references. The global reference section includes subroutines, functions, and common variables referenced by a particular module. The CDUs, one for the pilot and one for the copilot, are used for flight management purposes. Operations performed with the CDU affects the aircraft's guidance, navigation, and display software.

  20. Proposed plan for remedial action at the quarry residuals operable unit of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1998-03-01

    This proposed plan addresses the management of contamination present in various components of the quarry residuals operable unit (QROU) of the Weldon Spring site, which is located in St. Charles County, Missouri. The QROU consists of (1) residual waste at the quarry proper; (2) the Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek; and (3) quarry groundwater located primarily north of the slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of the evaluations for this operable unit. Remedial activities for the QROU will be conducted by the US Department of Energy (DOE) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of the remedial investigation/feasibility study (RI/FS) process required for the QROU under CERCLA, three major evaluation documents have been prepared to support cleanup decisions for this operable unit. decisions for this operable unit

  1. How Can the United States Army Improve Human Intelligence in Peace Operations?

    National Research Council Canada - National Science Library

    Wright, David

    2003-01-01

    .... These secondary collectors, such as the Military Police, Psychological Operations, Civil Affairs and Line Units conduct liaison with international and local police forces, host-government official...

  2. Steam generator tube integrity requirements and operating experience in the United States

    International Nuclear Information System (INIS)

    Karwoski, K.J.

    2009-01-01

    Steam generator tube integrity is important to the safe operation of pressurized-water reactors. For ensuring tube integrity, the U.S. Nuclear Regulatory Commission uses a regulatory framework that is largely performance based. This performance-based framework is supplemented with some prescriptive requirements. The framework recognizes that there are three combinations of tube materials and heat treatments currently used in the United States and that the operating experience depends, in part, on the type of material used. This paper summarizes the regulatory framework for ensuring steam generator tube integrity, it highlights the current status of steam generators, and it highlights some of the steam generator issues and challenges that exist in the United States. (author)

  3. Mastering vRealize operations manager analyze and optimize your it environment by gaining a practical understanding of vRealize operations 6.6

    CERN Document Server

    Kaloferov, Spas; Carnie, Alasdair; Norris, Scott

    2018-01-01

    Nowadays you can find companies that have virtualized 75%, or even more than 95% of their environment. Having a good forensic tool with comprehensive predictive analysis functionality, to monitor your virtual environment and software, is crucial. vRealize Operations 6.6 offers this and much more to help your business run uninterrupted.

  4. An operating nuclear utility's experience with the ALARA design of a new nuclear unit

    International Nuclear Information System (INIS)

    Rodgers, R.C.

    1985-01-01

    This talk presents a review of how operating experience at Northeast Utilities has been factored into the design of a new nuclear unit and the development and management of the radiation protection program. Their operational experience has indicated that there are two facets to keeping radiation exposures ALARA. The first is the proper ALARA design of the unit. The other facet is the design of a comprehensive radiation protection program. The author discusses these facets in some detail

  5. Operator support system for power unit control in abnormal modes of operation

    International Nuclear Information System (INIS)

    Kurka, J.

    1993-01-01

    I and C system technology, partly Soviet and partly Czechoslovakian, used on the NPP Dukovany units represents the control technology standard of late 70-ties and it becomes the weak part of the whole system. The modernization of the system, therefore, is necessary and it is already in preparation. The specification of both the scope and the depth of upgrading/replacement is being carried out within the framework of the PHARE program. The second phase of the program aimed at the final specifications of requirements on new I and C system is in progress. The output will serve as detailed specification for bid invitation for control system supplier. Parallely, the preparation of specification for WWER-440 full-scope plant simulator for operator training is in progress as well. In the case of two units with WWER-1000 MW reactors, the completion of construction of which was even threaten for a certain period of time, essential changes have taken place in the design of both the I and C systems and the reactor core. 7 figs

  6. Application of total care time and payment per unit time model for physician reimbursement for common general surgery operations.

    Science.gov (United States)

    Chatterjee, Abhishek; Holubar, Stefan D; Figy, Sean; Chen, Lilian; Montagne, Shirley A; Rosen, Joseph M; Desimone, Joseph P

    2012-06-01

    The relative value unit system relies on subjective measures of physician input in the care of patients. A payment per unit time model incorporates surgeon reimbursement to the total care time spent in the operating room, postoperative in-house, and clinic time to define payment per unit time. We aimed to compare common general surgery operations by using the total care time and payment per unit time method in order to demonstrate a more objective measurement for physician reimbursement. Average total physician payment per case was obtained for 5 outpatient operations and 4 inpatient operations in general surgery. Total care time was defined as the sum of operative time, 30 minutes per hospital day, and 30 minutes per office visit for each operation. Payment per unit time was calculated by dividing the physician reimbursement per case by the total care time. Total care time, physician payment per case, and payment per unit time for each type of operation demonstrated that an average payment per time spent for inpatient operations was $455.73 and slightly more at $467.51 for outpatient operations. Partial colectomy with primary anastomosis had the longest total care time (8.98 hours) and the least payment per unit time ($188.52). Laparoscopic gastric bypass had the highest payment per time ($707.30). The total care time and payment per unit time method can be used as an adjunct to compare reimbursement among different operations on an institutional level as well as on a national level. Although many operations have similar payment trends based on time spent by the surgeon, payment differences using this methodology are seen and may be in need of further review. Copyright © 2012 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  7. Explicit isospectral flows for the AKNS operator on the unit interval

    International Nuclear Information System (INIS)

    Amour, L

    2009-01-01

    We consider the AKNS operator on the unit interval. The boundary conditions are self-adjoint separated boundary conditions. For fixed boundary conditions, we make the formulae for flows induced by general tangent vector fields on isospectral sets explicit

  8. Salem Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Initial reactor criticality was achieved 12/11/76 and power generation began 12/25/76. Information is presented concerning operation, maintenance, procedure and specification changes, power generation, unit shutdowns and forced power reductions, testing, and personnel radiation exposures

  9. Operational aerial snow surveying in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Peck, E L; Carroll, T R; Vandemark, S C

    1980-03-01

    An airborne gamma radiation detector and data acquisition system has been designed for rapid measurement of the snow cover water equivalent over large open areas. Research and field tests conducted prior to the implementation of an operational snow measurement system in the United States are reviewed. Extensive research test flights were conducted over large river basins of the north-central plains and in the high mountain valleys of the inter-mountain West. Problems encountered during development include: (1) error in the gross gamma flux produced by atmospheric radon gas daughters; (2) spatial and temporal variability in soil moisture; and (3) errors in gamma radiation count rate introduced by aircraft and cosmic background radiation. Network design of operational flight line and ground observation data used in a river forecasting system are discussed. 22 references, 4 figures, 2 tables.

  10. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    International Nuclear Information System (INIS)

    Mellor, S.P.; Matthee, F.W.

    2002-01-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  11. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    Energy Technology Data Exchange (ETDEWEB)

    Mellor, S.P.; Matthee, F.W. [ESKOM, Koeberg Nuclear Power Station (South Africa)

    2002-07-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  12. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  13. RCRA facility investigation report for the 200-PO-1 operable unit. Revision 1

    International Nuclear Information System (INIS)

    1997-05-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) report is prepared in support of the RFI/corrective measures study process for the 200-PO-1 Groundwater Operable Unit in the 200 East Area of the Hanford Site. This report summarizes existing information on this operable unit presented in the 200 East and PUREX Aggregate Area Management Study Reports, contaminant specific studies, available modeling data, and groundwater monitoring data summary reports. Existing contaminant data are screened against current regulatory limits to determine contaminants of potential concern (COPC). Each identified COPC is evaluated using well-specific and plume trend analyses

  14. Mathematics for water and wastewater operations -- 6th ed. Sixth edition

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    An operator of a water or wastewater treatment plant should routinely evaluate the efficiency of the individual process units and of the plant. This manual is intended to help the operator to determine process efficiency through the use of mathematical calculations rather than trial-and-error methods. The bulk of the manual consists of sample problems of typical in-plant situations, step-by-step descriptions of what the operator might consider in solving these problems, and worksheets for use in conjunction with other manuals used in courses on water treatment and sludge technology. Sections of the manual cover calculations for basic water treatment operations, the activated sludge process, the anaerobic digestion process, filtration, and chemical feed rates. Appendices contain conversion factors, formulas, and answers to problems.

  15. Effect of Natural Aging and Cold Working on Microstructures and Mechanical Properties of Al-4.6Cu-0.5Mg-0.5Ag alloy

    Science.gov (United States)

    Chen, Yu-Te; Lee, Sheng-Long; Bor, Hui-Yun; Lin, Jing-Chie

    2013-06-01

    This research investigates the effects of natural aging and cold working prior to artificial aging on microstructures and mechanical properties of Al-4.6Cu-0.5Mg-0.5Ag alloy. Mechanical properties relative to microstructure variations were elucidated by the observations of the optical microscope (OM), differential scanning calorimeter (DSC), electrical conductivity meter (pct IACS), and transmission electron microscopy (TEM). The results showed that natural aging treatment has little noticeable benefit on the quantity of precipitation strengthening phases and mechanical properties, but it increases the precipitation strengthening rate at the initial stage of artificial aging. Cold working brings more lattice defects which suppress Al-Cu (GP zone) and Mg-Ag clustering, and therefore the precipitation of Ω phase decreases. Furthermore, more dislocations are formed, leading to precipitate the more heterogeneous nucleation of θ' phase. The above-mentioned precipitation phenomena and strain hardening effect are more obvious with higher degrees of cold working.

  16. Community Solutions for Solid Waste Pollution, Level 6. Teacher Guide. Operation Waste Watch.

    Science.gov (United States)

    Virginia State Dept. of Waste Management, Richmond. Div. of Litter & Recycling.

    Operation Waste Watch is a series of seven sequential learning units which addresses the subject of litter control and solid waste management. Each unit may be used in a variety of ways, depending on the needs and schedules of individual schools, and may be incorporated into various social studies, science, language arts, health, mathematics, and…

  17. Safety evaluation report related to the operation of Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414)

    International Nuclear Information System (INIS)

    1984-07-01

    The report supplements the Safety Evaluation Report (NUREG-0954) issued in February 1983 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, and Saluda River Electric Cooperative, Inc. as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. This supplement provides additional information supporting the license for fuel loading and precriticality testing for Unit 1

  18. Data collection on the unit control room simulator as a method of operator reliability analysis

    International Nuclear Information System (INIS)

    Holy, J.

    1998-01-01

    The report consists of the following chapters: (1) Probabilistic assessment of nuclear power plant operation safety and human factor reliability analysis; (2) Simulators and simulations as human reliability analysis tools; (3) DOE project for using the collection and analysis of data from the unit control room simulator in human factor reliability analysis at the Paks nuclear power plant; (4) General requirements for the organization of the simulator data collection project; (5) Full-scale simulator at the Nuclear Power Plants Research Institute in Trnava, Slovakia, used as a training means for operators of the Dukovany NPP; (6) Assessment of the feasibility of quantification of important human actions modelled within a PSA study by employing simulator data analysis; (7) Assessment of the feasibility of using the various exercise topics for the quantification of the PSA model; (8) Assessment of the feasibility of employing the simulator in the analysis of the individual factors affecting the operator's activity; and (9) Examples of application of statistical methods in the analysis of the human reliability factor. (P.A.)

  19. 100-BC-1 Operable Unit focused feasibility study

    International Nuclear Information System (INIS)

    Day, R.E.

    1994-01-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act feasibility study includes development and screening of alternatives (Phases 1 and 2) and the detailed analysis of alternatives (Phase 3). This focused feasibility study constitutes the Phase 3 portion of the feasibility study process for the remedial alternatives initially developed and screened in the 100 Area Feasibility Study Phases 1 and 2 (DOE-RL 1993a). The focused feasibility study process is conducted in two stages, a Process Document (DOE-RL 1994a) and an operable unit-specific focused feasibility study document, such as this one. The focused feasibility study process is performed by implementing a ''plug-in'' style approach; as defined in greater detail in the Process Document, which is a companion to this document. The objective of this focused feasibility study is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures for candidate waste sites associated with the 100-BC-1 Operable Unit which is located in the north-central part of the Hanford Site. The interim remedial measure candidate waste sites are determined in the Limited Field Investigation (DOE-RL 1993b). Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  20. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented

  1. Flux distribution measurements in the Bruce B Unit 6 reactor using a transportable traveling flux detector system

    International Nuclear Information System (INIS)

    Leung, T.C.; Drewell, N.H.; Hall, D.S.; Lopez, A.M.

    1987-01-01

    A transportable traveling flux detector (TFD) system for use in power reactors has been developed and tested at Chalk River Nuclear Labs. in Canada. It consists of a miniature fission chamber, a motor drive mechanism, a computerized control unit, and a data acquisition subsystem. The TFD system was initially designed for the in situ calibration of fixed self-powered detectors in operating power reactors and for flux measurements to verify reactor physics calculations. However, this system can also be used as a general diagnostic tool for the investigation of apparent detector failures and flux anomalies and to determine the movement of reactor internal components. This paper describes the first successful use of the computerized TFD system in an operating Canada deuterium uranium (CANDU) power reactor and the results obtained from the flux distribution measurements. An attempt is made to correlate minima in the flux profile with the locations of fuel channels so that future measurements can be used to determine the sag of the channels. Twenty-seven in-core flux detector assemblies in the 855-MW (electric) Unit 6 reactor of the Ontario Hydro Bruce B Generating Station were scanned

  2. Operational experience in the United Kingdom

    International Nuclear Information System (INIS)

    Gronow, W.S.

    1977-01-01

    In the UK there are 26 Magnox reactors and 4 AGRs operating on 11 licensed sites; a further 6 AGRs are under construction on 2 additional and one of the existing sites. The arrangements by which the Nuclear Installations Inspectorate, on behalf of the Health and Safety Executive, carries out its regulatory functions at operating nuclear power plants are described. The range of activities undertaken is described with special reference being made to the biennial shutdowns for approved maintenance and inspections which are required by conditions attached to the site licence. The other means by which the continuing safety of these power reactors is assured are explained and include the relationship with the licensee's own Nuclear Safety Committee, approved arrangements for modifications to plant systems or components which have importance for safety and long term reviews of safety aspects. (author)

  3. An automated thermal relaxation calorimeter for operation at low temperature (0.5K

    International Nuclear Information System (INIS)

    Banerjee, S.; Prins, M.W.J.; Rajeev, K.P.; Raychaudhuri, A.K.

    1992-01-01

    An automated calorimeter for measurement of specific heat in the temperature range 10K>T>0.5K. It uses sample of moderate size (100-1000 mg), has a moderate precision and accuracy (2%-5%) is easy to operate and the measurements can be done quickly with 3 He economy is described. The accuracy of this calorimeter was checked by measurement of specific heat of copper and that of aluminium near its superconducting transition temperature. (author). 12 refs., 11 figs

  4. Remedial investigation for the 200-BP-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Buckmaster, M.A.

    1991-01-01

    The Hanford Site, Richland, Washington, contains over 1500 identified waste sites that will be characterized and remediated over the next 30 years. In support of the ''Hanford Federal Facility Agreement and Consent Order,'' the US Department of Energy has initiated a remedial investigation/feasibility study (RI/FS) at the 200-BP-1 operable unit. The 200-BP-1 RI is the first Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation on the Hanford Site that involves drilling into highly radioactive and chemically contaminated soils. The initial phase of the site characterization is oriented toward determining the nature and extent of any contamination present in the vicinity of the 200-BP-1 operable unit. The major focus of the Phase I RI is the drilling and sampling of 10 inactive waste disposal units which received low level radioactive liquid waste

  5. Sol-Gel Synthesis of La(0.6)Sr(0.4)CoO(3-x) and Sm(0.5)Sr(0.5)CoO(3-x) Cathode Nanopowders for Solid Oxide Fuel Cells

    Science.gov (United States)

    Bansal, Narottam P.; Wise, Brent

    2011-01-01

    Nanopowders of La(0.6)Sr(0.4)CoO(3-x) (LSC) and Sm(0.5)Sr(0.5)CoO(3-x) (SSC) compositions, which are being investigated as cathode materials for intermediate temperature solid oxide fuel cells (IT-SOFC) with La(Sr)Ga(Mg)O(3-x) (LSGM) as the electrolyte, were synthesized by low-temperature sol-gel method using metal nitrates and citric acid. Thermal decomposition of the citrate gels was followed by simultaneous DSC/TGA methods. Development of phases in the gels, on heat treatments at various temperatures, was monitored by x-ray diffraction. Solgel powders calcined at 550 to 1000 C consisted of a number of phases. Single perovskite phase La(0.6)Sr(0.4)CoO(3-x) or Sm(0.5)Sr(0.5)CoO(3-x) powders were obtained at 1200 and 1300 C, respectively. Morphological analysis of the powders calcined at various temperatures was done by scanning electron microscopy. The average particle size of the powders was approx.15 nm after 700 C calcinations and slowly increased to 70 to 100 nm after heat treatments at 1300 to 1400 C.

  6. Risk-based decision analysis for groundwater operable units

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1995-01-01

    This document proposes a streamlined approach and methodology for performing risk assessment in support of interim remedial measure (IRM) decisions involving the remediation of contaminated groundwater on the Hanford Site. This methodology, referred to as ''risk-based decision analysis,'' also supports the specification of target cleanup volumes and provides a basis for design and operation of the groundwater remedies. The risk-based decision analysis can be completed within a short time frame and concisely documented. The risk-based decision analysis is more versatile than the qualitative risk assessment (QRA), because it not only supports the need for IRMs, but also provides criteria for defining the success of the IRMs and provides the risk-basis for decisions on final remedies. For these reasons, it is proposed that, for groundwater operable units, the risk-based decision analysis should replace the more elaborate, costly, and time-consuming QRA

  7. Outcomes of PCI in Relation to Procedural Characteristics and Operator Volumes in the United States.

    Science.gov (United States)

    Fanaroff, Alexander C; Zakroysky, Pearl; Dai, David; Wojdyla, Daniel; Sherwood, Matthew W; Roe, Matthew T; Wang, Tracy Y; Peterson, Eric D; Gurm, Hitinder S; Cohen, Mauricio G; Messenger, John C; Rao, Sunil V

    2017-06-20

    Professional guidelines have reduced the recommended minimum number to an average of 50 percutaneous coronary intervention (PCI) procedures performed annually by each operator. Operator volume patterns and associated outcomes since this change are unknown. The authors describe herein PCI operator procedure volumes; characteristics of low-, intermediate-, and high-volume operators; and the relationship between operator volume and clinical outcomes in a large, contemporary, nationwide sample. Using data from the National Cardiovascular Data Registry collected between July 1, 2009, and March 31, 2015, we examined operator annual PCI volume. We divided operators into low- (100 PCIs per year) volume groups, and determined the adjusted association between annual PCI volume and in-hospital outcomes, including mortality. The median annual number of procedures performed per operator was 59; 44% of operators performed PCI procedures per year. Low-volume operators more frequently performed emergency and primary PCI procedures and practiced at hospitals with lower annual PCI volumes. Unadjusted in-hospital mortality was 1.86% for low-volume operators, 1.73% for intermediate-volume operators, and 1.48% for high-volume operators. The adjusted risk of in-hospital mortality was higher for PCI procedures performed by low- and intermediate-volume operators compared with those performed by high-volume operators (adjusted odds ratio: 1.16 for low versus high; adjusted odds ratio: 1.05 for intermediate vs. high volume) as was the risk for new dialysis post PCI. No volume relationship was observed for post-PCI bleeding. Many PCI operators in the United States are performing fewer than the recommended number of PCI procedures annually. Although absolute risk differences are small and may be partially explained by unmeasured differences in case mix between operators, there remains an inverse relationship between PCI operator volume and in-hospital mortality that persisted in risk

  8. Operation time extension for power units of the first generation NPP and the liability for potential damage

    International Nuclear Information System (INIS)

    Kovalevich, O.M.

    2000-01-01

    The problem on the operation time extension for the six operating NPP first generation power units is discussed. However it is not advisable to improve the safety of these power units up to the acceptable level, therefore there arises the contradiction between the operation time extension of these power units and potential damage for the population. The possibility of having the increased civilian-legal responsibility for potential harm and losses in case of an accident is proposed to be considered as a compensating measure. The measures for realization of this civilian-legal responsibility are described [ru

  9. Browns Ferry Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Units 1 and 2 were down for the first half of the year caused by the fire of March 1975. Net electrical power generated by Unit 1 this year was 1,301,183 MWH with the generator on line 2,175.25 hrs. Unit 2 generated 1,567,170 MWH with the generator on line 2,548.73 hrs. Unit 3 began full power operation on November 20th and generated 1,416,891 MWH with the generator on line 2,058.20 hrs. Information is presented concerning operations, fuel performance, surveillance testing, containment leak testing, changes, power generation, shutdown and forced reductions, coolant chemistry, occupational radiation exposures, and maintenance

  10. Operating of mobile machine units system using the model of multicomponent complex movement

    OpenAIRE

    A. Lebedev; R. Kaidalov; N. Artiomov; M. Shulyak; M. Podrigalo; D. Abramov; D. Klets

    2015-01-01

    To solve the problems of mobile machine units system operating it is proposed using complex multi-component (composite) movement physical models. Implementation of the proposed method is possible by creating of automatic operating systems of fuel supply to the engines using linear accelerometers. Some examples to illustrate the proposed method are offered.

  11. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  12. Estimation of the optimal operating conditions for a radiation chemical neutralization unit

    International Nuclear Information System (INIS)

    Putilov, A.V.; Kamenetskaya, S.A.; Pshezhetskii, S.Ya.; Kazakov, M.S.; Kudryavtsev, S.L.; Petrukhin, N.V.; Misharin, B.A.; Koneev, V.Z.

    1985-01-01

    An estimate is made of the effect of the hydrodynamic conditions on the efficiency of foam units for the radiation chemical neutralization of impurities, taking into account the penetrating power of accelerated electrons having various energies. Expressions are obtained for calculating the efficiency of such units with sectionized operation of the chamber and taking account of the effect of incomplete mixing of the products of radiolysis through the height of the foam layer

  13. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    International Nuclear Information System (INIS)

    Richard P. Wells

    2007-01-01

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year

  14. Safety evaluation report related to the operation of Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414)

    International Nuclear Information System (INIS)

    1984-12-01

    This report supplements the Safety Evaluation Report (NUREG-0954) issued in February 1983 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, and Saluda River Electric Cooperative, Inc., as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. This supplement provides additional information supporting the license for initial criticality and power ascension to full-power opertion for Unit 1

  15. United States cost of military force projection in the Persian Gulf, 1976-2007

    Energy Technology Data Exchange (ETDEWEB)

    Stern, Roger J. [Oil, Energy and the Middle East Program, Department of Near Eastern Studies and Princeton Environmental Institute, Guyot Hall, Princeton University, Princeton, NJ 08544 (United States)

    2010-06-15

    This paper presents the first estimate of United States military cost for Persian Gulf force (C{sub PGfp}) derived entirely by a quantitative method. An activity-based cost (ABC) model uses geographic distribution of aircraft carriers as a proxy allocator of Department of Defense (DoD) baseline cost to regional operations. Allocation follows simply from DoD data that since 1990 no less than one aircraft carrier has been continuously on-station in the Persian Gulf; that eight are required to keep one on-station there; that the Navy has had eleven-fifteen carriers since 1990; and that Army and Air Force units are virtually never deployed to combat operations without Navy units. For 1976-2007 C{sub PGfp} is estimated to be $6.8 x 10{sup 12} and for 2007 $0.5 x 10{sup 12} (2008$). This substantial military investment is not a remedy for the market failure at the heart of regional security problem, which is oil market power. When C{sub PGfp} is added to economic losses attributed to market power in another recent study, the severity of this market failure becomes more apparent. (author)

  16. United States cost of military force projection in the Persian Gulf, 1976-2007

    International Nuclear Information System (INIS)

    Stern, Roger J.

    2010-01-01

    This paper presents the first estimate of United States military cost for Persian Gulf force (C PGfp ) derived entirely by a quantitative method. An activity-based cost (ABC) model uses geographic distribution of aircraft carriers as a proxy allocator of Department of Defense (DoD) baseline cost to regional operations. Allocation follows simply from DoD data that since 1990 no less than one aircraft carrier has been continuously on-station in the Persian Gulf; that eight are required to keep one on-station there; that the Navy has had eleven-fifteen carriers since 1990; and that Army and Air Force units are virtually never deployed to combat operations without Navy units. For 1976-2007 C PGfp is estimated to be $6.8 x 10 12 and for 2007 $0.5 x 10 12 (2008$). This substantial military investment is not a remedy for the market failure at the heart of regional security problem, which is oil market power. When C PGfp is added to economic losses attributed to market power in another recent study, the severity of this market failure becomes more apparent. (author)

  17. Crystal and magnetic study of the disordered perovskites Ca(Mn{sub 0.5}Sb{sub 0.5})O{sub 3} and Ca(Fe{sub 0.5}Sb{sub 0.5})O{sub 3}

    Energy Technology Data Exchange (ETDEWEB)

    Retuerto, M., E-mail: mretuerto@icmm.csic.es [Instituto de Ciencia de Materiales de Madrid, CSIC, Energia, Medio Ambiente y Tecnologias Sostenibles, Sor Juana Ines de la Cruz 3, Cantoblanco, E-28049 Madrid (Spain); Martinez-Lope, M.J.; Garcia-Hernandez, M. [Instituto de Ciencia de Materiales de Madrid, CSIC, Energia, Medio Ambiente y Tecnologias Sostenibles, Sor Juana Ines de la Cruz 3, Cantoblanco, E-28049 Madrid (Spain); Munoz, A. [Departamento de Fisica Aplicada, EPS, Universidad Carlos III, Avda. Universidad 30, E-28911 Leganes-Madrid (Spain); Fernandez-Diaz, M.T. [Institut Max Von Laue Paul Langevin, F-38042 Grenoble (France); Alonso, J.A. [Instituto de Ciencia de Materiales de Madrid, CSIC, Energia, Medio Ambiente y Tecnologias Sostenibles, Sor Juana Ines de la Cruz 3, Cantoblanco, E-28049 Madrid (Spain)

    2010-10-15

    We have investigated the double perovskites Ca{sub 2}MSbO{sub 6} (M = Mn, Fe) that have been prepared by solid-state reaction (M = Fe) and wet chemistry procedures (M = Mn). The crystal and magnetic structures have been studied from X-ray (XRD) and neutron powder diffraction (NPD) data. Rietveld refinements show that the crystal structures are orthorhombic (space group Pbnm) with complete disorder of M and Sb cations, so the formula should be rewritten as Ca(M{sub 0.5}Sb{sub 0.5})O{sub 3}. Due to this disorder no evidences of Jahn-Teller distortion can be observed in the MnO{sub 6} octahedra of Ca(Mn{sub 0.5}Sb{sub 0.5})O{sub 3}, in contrast with the ordered double perovskite Sr{sub 2}MnSbO{sub 6}. Ca(Fe{sub 0.5}Sb{sub 0.5})O{sub 3} behaves as an antiferromagnet with an ordered magnetic moment for Fe{sup 3+} of 1.53(4){mu}{sub B} and a propagation vector k = 0, as investigated by low-temperature NPD. The antiferromagnetic ordering is a result of the high degree of Fe/Sb anti-site disorder of the sample, which originates the spontaneous formation of Fe-rich islands, characterized by the presence of strong Fe-O-Fe antiferromagnetic couplings with enough long-range coherence to produce a magnetic contribution perceptible by NPD. By contrast, the magnetic structure of Ca(Mn{sub 0.5}Sb{sub 0.5})O{sub 3} cannot be observed by low-temperature NPD because the magnitude of the ordered magnetic moments is below the detection threshold for neutrons.

  18. OPERATING OF MOBILE MACHINE UNITS SYSTEM USING THE MODEL OF MULTICOMPONENT COMPLEX MOVEMENT

    Directory of Open Access Journals (Sweden)

    A. Lebedev

    2015-07-01

    Full Text Available To solve the problems of mobile machine units system operating it is proposed using complex multi-component (composite movement physical models. Implementation of the proposed method is possible by creating of automatic operating systems of fuel supply to the engines using linear accelerometers. Some examples to illustrate the proposed method are offered.

  19. Operating Experience of MACSTOR Modules at CANDU 6 Stations

    International Nuclear Information System (INIS)

    Beaudoin, Robert R.

    2005-01-01

    Over the last three decades, Atomic Energy of Canada Limited (AECL) has contributed to the technology development and implementation of dry spent fuel management facilities in Canada, Korea and Romania During that period, AECL has developed a number of concrete canister models and the MACSTOR200 module, a medium size air-cooled vault with a 228 MgU (Mega grams of Uranium) capacity. AECL's dry storage technologies were used for the construction of eight large-scale above ground dry storage facilities for CANDU spent fuel. As of 2005, those facilities have an installed capacity in excess of 5,000 MgU. Since 1995, the two newest dry storage installations built for CANDU 6 reactors at Gentilly 2 (Canada) and Cernavoda (Romania) used the MACSTOR 200 module. Seven such modules have been built at Gentilly 2 during the 1995 to 2004 period and one at Cernavoda in 2003. The construction and operating experience of those modules is reviewed in this paper. The MACSTOR 200 modules were initially designed for a 50-year service life, with recent units at Gentilly 2 licensed for a 100-year service life in a rural (non-maritime) climate. During the 1995-2005 period, six of the eight modules were loaded with fuel. Their operation has brought a significant amount of experience on loading operations, performance of fuel handling equipment, radiation shielding, heat transfer, monitoring of the two confinement boundaries and radiation dose to personnel. Heat dissipation performance of the MACSTOR 200 was initially licensed using values derived from full scale tests made at AECL's Whiteshell Research Laboratories, that were backed-up by temperature measurements made on the first two modules. Results and computer models developed for the MACSTOR 200 module are described. Korea Hydro and Nuclear Power (KHNP) and its subsidiary Nuclear Environment Technology Institute (NETEC), in collaboration with Hyundai Engineering Company Ltd. (HEC) and AECL, are developing a new dry storage module to

  20. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  1. ITER PF6 double pancakes winding line

    Energy Technology Data Exchange (ETDEWEB)

    Du, Shuangsong [Institute of Plasma Physics, Chinese Academy of Science, Hefei (China); University of Science and Technology of China, Hefei (China); Wen, Wei, E-mail: wenwei@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Science, Hefei (China); Chen, Jin; Wu, Weiyue; Song, Yuntao; Shen, Guang [Institute of Plasma Physics, Chinese Academy of Science, Hefei (China)

    2017-03-15

    Highlights: • ITER PF6 double pancakes “two-in-hand” winding line layout and main parameters were introduced, main winding sequences were also included. • Main features of each winding unit include de-spooling unit, straightening unit, sandblasting and cleaning unit, bending unit, turn insulation wrapping head, rotary table and automatic control system were depicted. • PF6 double pancake winding line was commissioned with PF5 empty jacket conductor after the installation and testing of each unit, ±0.5 mm turn positioning and ±2 turn to turn deviations were achieved. - Abstract: The Poloidal Field (PF) coils are one of the main sub-systems of the ITER magnets. The PF6 coil is being manufactured by the Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP) as per the Poloidal Field coils cooperation agreement signed between ASIPP and Fusion for Energy (F4E).The ITER PF6 winding pack is composed by stacking of 9 double pancakes. Each double pancake is wound with a “two-in-hand” configuration. This paper describes the ITER PF6 double pancakes winding line, including layout and main parameters of the winding line, features of main units and the commissioning trial with PF5 empty jacket conductor.

  2. Crystallization of Sr0.5Ba0.5Nb2O6 Thin Films on LaNiO3 Electrodes by RF Magnetron Reactive Sputtering

    Science.gov (United States)

    Jong, Chao-An; Gan, Jon-Yiew

    2000-02-01

    Strontium barium niobium (Sr0.5Ba0.5Nb2O6) (SBN) thin films are prepared on conductive-oxide LNO (LaNiO3) electrodes by the rf magnetron sputtering system. Instead of conventional furnace annealing, SBN thin films are crystallized by rapid thermal annealing (RTA) above 700°C for 5 min. The textured SBN films are crystallized with two orientations: one is the (001) or (310) direction, and the other is the (002) or (620) direction. Films compositions measured by the electron spectroscopy of chemical analysis (ESCA) quantitative analysis method show nearly the same stoichiometric ratio as the target. The depth profiles of SBN films and the target are examined by secondary ion mass spectrometer (SIMS). The concentrations of the films are quite uniform. After being heat treated at 800°C for 5 min by RTA, La and Ni diffuse into the SBN film. The diffusion coefficient of La in SBN films is also calculated.

  3. Feasibility Study for Operable Unit 7-13/14

    International Nuclear Information System (INIS)

    K. Jean Holdren Thomas E. Bechtold Brian D. Preussner

    2007-01-01

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision

  4. Feasibility Study for Operable Unit 7-13/14

    Energy Technology Data Exchange (ETDEWEB)

    K. Jean Holdren

    2007-05-29

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision.

  5. A prospective cohort study of the morbidity associated with operative vaginal deliveries performed by day and at night.

    Science.gov (United States)

    Butler, Katherine; Ramphul, Meenakshi; Dunney, Clare; Farren, Maria; McSweeney, Aoife; McNamara, Karen; Murphy, Deirdre J

    2014-10-29

    To evaluate maternal and neonatal outcomes associated with operative vaginal deliveries (OVDs) performed by day and at night. Prospective cohort study. Urban maternity unit in Ireland with off-site consultant staff at night. All nulliparous women requiring an OVD with a term singleton fetus in a cephalic presentation from February to November 2013. Delivery outcomes were compared for women who delivered by day (08:00-19:59) or at night (20:00-07:59). The main outcomes included postpartum haemorrhage (PPH), anal sphincter tear and neonatal unit admission. Procedural factors included operator grade, sequential use of instruments and caesarean section. Of the 597 women who required an OVD, 296 (50%) delivered at night. Choice of instrument, place of delivery, sequential use of instruments and caesarean section did not differ significantly in relation to time of birth. Mid-grade operators performed less OVDs by day than at night, OR 0.60 (95% CI 0.43 to 0.83), and a consultant supervisor was more frequently present by day, OR 2.26 (95% CI 1.05 to 4.83). Shoulder dystocia occurred more commonly by day, OR 2.57 (95% CI 1.05 to 6.28). The incidence of PPH, anal sphincter tears, neonatal unit admission, fetal acidosis and neonatal trauma was similar by day and at night. The mean decision to delivery intervals were 12.0 and 12.6 min, respectively. There was no evidence of an association between time of OVD and adverse perinatal outcomes despite off-site consultant obstetric support at night. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  6. Analysis of neonatal sepsis in one neonatal intensive care unit for 6 years

    Directory of Open Access Journals (Sweden)

    Peter Chun

    2010-04-01

    Full Text Available Purpose : Sepsis is a significant cause of morbidity and mortality in the newborn, particularly in preterm. The objective of this study was to analyze the incidence rate, causative pathogens and clinical features of neonatal sepsis in one neonatal intensive care unit (NICU for 6 years. Methods : This study was retrospectively performed to review the clinical and laboratory characteristics including sex, gestational age, birth weight, Apgar score, length of hospitalization, length of total parenteral nutrition, presence of central venous catheter, underlying diseases, laboratory findings, microorganisms isolated from blood culture, complications and mortality in 175 patients between January 2003 and December 2008. Results : 1 Sepsis was present in 175 of 3,747 infants for 6 years. There were more gram-positive organisms. 2 The gram-negatives were more prevalent in preterm. There were no significant differences of other clinical features between two groups. 3 Underlying diseases were found in 73.7%, and the most common disease was cardiovascular disease. The most common organisms of gram-positives and gram-negatives were methicillin resistant Staphylococcus aureus (MRSA and Serratia marcescens. 4 There was statistically significant difference on platelet counts between two groups (P&lt;0.05. 5 Complications were found in 18.3% and septic shock was the most common. MRSA was the most common pathogen in sepsis with complication. 6 The mortality rate was 7.4%. 7 There were differences in monthly blood stream infection/ 1,000 patient-days. Conclusion : The studies about the factors that can influence neonatal sepsis will contribute to decrease the infection rates in NICUs.

  7. Aquatic studies at the 100-HR-3 and 100-NR-1 operable units

    International Nuclear Information System (INIS)

    Cushing, C.E.

    1993-04-01

    Pacific Northwest Laboratory initiated a program to characterize selected aquatic biological populations to determine (1) existing levels of inorganic chemical and radionuclide contamination, and (2) the populations' suitability as indicators of chemical releases during cleanup activities at the US Department of Energy's Hanford Site. Following work plans for the ground-water operable units, lower trophic levels in the aquatic habitat (periphyton and caddisfly larvae) were evaluated for contaminants at the 100-HR-3 Operable Unit and 100-NR-1 Operable Unit. The results were evaluated to determine the need for further sampling. If the results showed no significant contamination compared to upriver levels, sampling would be discontinued. The periphyton community appears to be suitable for determining contamination levels. Baseline concentrations for stable chromium were established and will be useful for comparing samples collected when contaminant release is expected. Concentrations of 60 Co, 90 Sr, and 137 Cs in periphyton were essentially below detectable limits, which will also make this community useful in detecting potential releases of radionuclides during cleanup activities. Levels for both stable chromium and radionuclides were essentially below detection limits for caddisfly larvae. Thus, these organisms may be used to monitor suspected contaminant releases from cleanup activities; if concentrations exceed detection limits, they may be related to these activities. Two candidate threatened and endangered species of molluscs occur in the Hanford Reach of the Columbia River. These are the shortface lanx (Fisherola nuttalli), which is a Washington State candidate species, and the Columbia pebblesnail (Fluminicola columbiana), which is both a state and federal candidate species. Specimens of the shortface lanx were observed in the vicinity of N Springs (100-NR-1 Operable Unit); they likely occur throughout this area

  8. Unit operation in food manufacturing and processing. Shokuhin seizo/kako ni okeru tan'i sosa

    Energy Technology Data Exchange (ETDEWEB)

    Matsuno, R. (Kyoto Univ., Kyoto (Japan). Faculty of Aguriculture)

    1993-09-05

    Processed foods must be produced in mass, cheap and safe and should be suitable for the delicate taste of human being. Food tastes are effected by an outlook on human attitude, and the surrounding environment. And these factors are reflected to unit operation in food manufacturing and processing and it is clarified that there are many technical difficulties. The characteristics of unit operation for food manufacturing and processing are that the food materials are a multicomponent system, moreover, a very small amount of aroma components, taste components, vitamin, physiologically activation materials and so on are more important than the main components, and also inapplicable of the model centering to the most quantitative component. The purpose of unit operation in food manufacturing and processing is to produce the properties of matter matching to human sense, and therefore there are many problems left unsolved. The development of analytical technology also has an influence on manufacturing and processing technology. Consequently, food manufacturing and processing technology must be based on general science. It is necessary to develop unit operation with an understanding of mutual effect between food and human body.

  9. Results of 6th regular inspection of No.1 unit in Oi Power Plant

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    This report presents results of the 6th regular inspection of the No.1 unit in the Oi Power Plant. It was carried out during the period from July 11, 1986, to January 28, 1987. The inspection covered the main unit of the nuclear reactor, facilities for the nuclear reactor cooling system, facilities for the instrumentation control system, fuel facilities, radiation control facilities, disposal facilities, nuclear reactor containment facilities, and emergency power generation system. Checking of appearance, disassemblage, leak and functions-performance of these facilities was conducted. No abnormalities were found except that significant signs were detected in 725 steam generator heat transfer pipes and that leak was suspected in 2 fuel assemblies. The pipes were repaired and the fuel assemblies were replaced. All operations involved in the inspection were performed under conditions within the permissible dose as specified in the applicable laws. Major modification work carried out during the inspection period included the adoption of a burnable poison (B Type) and the charging of fuel for high burn-up demonstration test. The exposure dose of the company members and non-company members who performed the inspection work is also shown. (Nogami, K.)

  10. Training-induced inversion of spontaneous exchange bias field on La{sub 1.5}Ca{sub 0.5}CoMnO{sub 6}

    Energy Technology Data Exchange (ETDEWEB)

    Bufaiçal, L., E-mail: lbufaical@ufg.br [Instituto de Física, Universidade Federal de Goiás, 74001-970 Goiânia, GO (Brazil); Finkler, R.; Coutrim, L.T. [Instituto de Física, Universidade Federal de Goiás, 74001-970 Goiânia, GO (Brazil); Pagliuso, P.G. [Instituto de Física “Gleb Wataghin”, UNICAMP, 13083-859 Campinas, SP (Brazil); Grossi, C.; Stavale, F.; Baggio-Saitovitch, E.; Bittar, E.M. [Centro Brasileiro de Pesquisas Físicas, Rua Dr. Xavier Sigaud 150, 22290-180 Rio de Janeiro, RJ (Brazil)

    2017-07-01

    Highlights: • La{sub 1.5}Ca{sub 0.5}CoMnO{sub 6} exhibits spontaneous exchange bias effect at low temperature. • For successive hysteresis cycles it inverts the shift sign from negative to positive. • For a field cooled hysteresis cycle, the exchange bias effect greatly enhances. • Our results are compared to those of the analogue compound La{sub 1.5}Sr{sub 0.5}CoMnO{sub 6}. - Abstract: In this work we report the synthesis and structural, electronic and magnetic properties of La{sub 1.5}Ca{sub 0.5}CoMnO{sub 6} double-perovskite. This is a re-entrant spin cluster material which exhibits a non-negligible negative exchange bias effect when it is cooled in zero magnetic field from an unmagnetized state down to low temperature. X-ray powder diffraction, X-ray photoelectron spectroscopy and magnetometry results indicate mixed valence state at Co site, leading to competing magnetic phases and uncompensated spins at the magnetic interfaces. We compare the results for this Ca-doped material with those reported for the resemblant compound La{sub 1.5}Sr{sub 0.5}CoMnO{sub 6}, and discuss the much smaller spontaneous exchange bias effect observed for the former in terms of its structural and magnetic particularities. For La{sub 1.5}Ca{sub 0.5}CoMnO{sub 6}, when successive magnetization loops are carried, the spontaneous exchange bias field inverts its sign from negative to positive from the first to the second measurement. We discuss this behavior based on the disorder at the magnetic interfaces, related to the presence of a glassy phase. This compound also exhibits a large conventional exchange bias, for which there is no sign inversion of the exchange bias field for consecutive cycles.

  11. Analysis of inadvertent safety injection incident at Kori unit 3 on september 6, 1990

    International Nuclear Information System (INIS)

    Kim, Kyun Tae; Chung, Bub Dong; Kim, In Goo; Kim, Hho Jung

    1992-01-01

    The inadvertent safety injection incident occurred at Kori Unit 3 on September 6, 1990 is analyzed using RELAP5/MOD3 code. The event was initiated by a failure of main feedwater control valve in one of three steam generators. The actual sequence of plant transient with the proper estimations of the operator actions is investigated in the present calculation. The calculational results are compared with the plant transient data. It is shown that the results of the plant behaviors are in good agreement with the plant data. The emergency response guidelines is assessed for the time of the SI termination and the establishment of natural circulation. The changes in the time of the SI termination do not significantly affect the overall plant behaviors, and the natural circulation is established

  12. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC)

    OpenAIRE

    Mohammad Javad Abdollahi; Majid Moazzami

    2015-01-01

    In this paper security constraints unit commitment (SCUC) in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested...

  13. Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 successfully completed its first core cycle with unit availability of 95.2 percent. Saltwater leakage into the condenser continues to be a problem. Unit 2 achieved initial criticality November 30 and was initially paralleled to the Baltimore system on December 7. Information is presented concerning operations, specifications, maintenance, shutdowns and power reduction, and personnel exposures

  14. Safety evaluation report related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1987-08-01

    This report, Supplement No. 6 to the Safety Evaluation Report for the application filed by the Duquesne Light Company et al. (the licensee) for a license to operate the Beaver Valley Power Station, Unit 2 (Docket No. 50-412), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved when the Safety Evaluation Report and its Supplements 1, 2, 3, 4, and 5 were published

  15. Survey Method for Radiological Surveys of 300-FF-1 Operable Unit Soils and Material

    International Nuclear Information System (INIS)

    Brehm, D.M.

    1998-06-01

    This technical basis is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by radiological control technician (RCTs) to guide the excavation effort in accordance with the 300-FF-1 waste site Record of Decision (ROD). The ROD for the 300-FF-1 Operable Unit requires selective excavation, removal, and disposal of contaminated soil above 350 pCi/g total uranium activity. Soil above this level will be disposed of as radioactive waste. The remaining soil will remain onsite

  16. INEL Operable Unit 7-13 containment and stabilization configuration option

    International Nuclear Information System (INIS)

    Raivo, B.D.; Richardson, J.G.; Nickelson, D.F.

    1993-05-01

    A containment and stabilization configuration option has been developed for the Idaho National Engineering Laboratory's Subsurface Disposal Area Operable Unit 7-13, the transuranic (TRU)-contaminated waste pits and trenches. The configuration option is presented as an end-to-end system block diagram. Functional subelements are separately discussed, and technical background information, assumptions, input, high-level subelement requirements, and output are presented for each option

  17. Oconee Nuclear Station, Units 1, 2, and 3. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Information is presented concerning operations, performance characteristics, changes, tests, inspections, containment leak tests, maintenance, primary coolant chemistry, station staff changes, reservoir investigations, plume mapping, and operational environmental radioactivity monitoring data for oconee Units 1, 2, and 3. The non-radiological environmental surveillance program is also described. (FS)

  18. The next generation CANDU 6

    International Nuclear Information System (INIS)

    Hopwood, J.M.

    1999-01-01

    AECL's product line of CANDU 6 and CANDU 9 nuclear power plants are adapted to respond to changing market conditions, experience feedback and technological development by a continuous improvement process of design evolution. The CANDU 6 Nuclear Power Plant design is a successful family of nuclear units, with the first four units entering service in 1983, and the most recent entering service this year. A further four CANDU 6 units are under construction. Starting in 1996, a focused forward-looking development program is under way at AECL to incorporate a series of individual improvements and integrate them into the CANDU 6, leading to the evolutionary development of the next-generation enhanced CANDU 6. The CANDU 6 improvements program includes all aspects of an NPP project, including engineering tools improvements, design for improved constructability, scheduling for faster, more streamlined commissioning, and improved operating performance. This enhanced CANDU 6 product will combine the benefits of design provenness (drawing on the more than 70 reactor-years experience of the seven operating CANDU 6 units), with the advantages of an evolutionary next-generation design. Features of the enhanced CANDU 6 design include: Advanced Human Machine Interface - built around the Advanced CANDU Control Centre; Advanced fuel design - using the newly demonstrated CANFLEX fuel bundle; Improved Efficiency based on improved utilization of waste heat; Streamlined System Design - including simplifications to improve performance and safety system reliability; Advanced Engineering Tools, -- featuring linked electronic databases from 3D CADDS, equipment specification and material management; Advanced Construction Techniques - based on open top equipment installation and the use of small skid mounted modules; Options defined for Passive Heat Sink capability and low-enrichment core optimization. (author)

  19. Design and operational parameters of transportable supercritical water oxidation waste destruction unit

    International Nuclear Information System (INIS)

    McFarland, R.D.; Brewer, G.R.; Rofer, C.K.

    1991-12-01

    Supercritical water oxidation (SCWO) is the destruction of hazardous waste by oxidation in the presence of water at temperatures and pressures above its critical point. A 1 gal/h SCWO waste destruction unit (WDU) has been designed, built, and operated at Los Alamos National Laboratory. This unit is transportable and is intended to demonstrate the SCWO technology on wastes at Department of Energy sites. This report describes the design of the WDU and the preliminary testing phase leading to demonstration

  20. The quality of operative notes at a general surgery unit.

    Science.gov (United States)

    Rogers, A; Bunting, M; Atherstone, A

    2008-09-01

    With the increasingly litigious nature of medical practice, accurate documentation is critical. This is particularly true for operative procedures, and medical councils have identified this and published guidelines to aid surgeons. However, these remain a frequently cited weakness in their defence in medico-legal cases. This study assessed the accuracy of operative notes in a general surgery unit in order to improve our practice. An audit of 100 consecutive operative notes was performed, and notes were assessed using the Royal College of Surgeons guidelines. The quality of note-taking of trainees was compared with that of consultant surgeons. A series of operation note pro formas was designed in response to the findings. Of the notes, 66% were completed by trainees. The vast majority of notes had no diagram to demonstrate the surgical findings or illustrate the actions. Specialist surgeons were more likely to describe the actions accurately, but less likely to describe wound closure methods or dressings used. They were also less likely to complete adequate postoperative orders. This study identifies key areas of weakness in our operative note-keeping. Pro formas should be introduced and made available for commonly performed procedures, and diagrams should be used wherever possible.

  1. Enhanced teaching and student learning through a simulator-based course in chemical unit operations design

    Science.gov (United States)

    Ghasem, Nayef

    2016-07-01

    This paper illustrates a teaching technique used in computer applications in chemical engineering employed for designing various unit operation processes, where the students learn about unit operations by designing them. The aim of the course is not to teach design, but rather to teach the fundamentals and the function of unit operation processes through simulators. A case study presenting the teaching method was evaluated using student surveys and faculty assessments, which were designed to measure the quality and effectiveness of the teaching method. The results of the questionnaire conclusively demonstrate that this method is an extremely efficient way of teaching a simulator-based course. In addition to that, this teaching method can easily be generalised and used in other courses. A student's final mark is determined by a combination of in-class assessments conducted based on cooperative and peer learning, progress tests and a final exam. Results revealed that peer learning can improve the overall quality of student learning and enhance student understanding.

  2. Structural characterization of layered Na0.5Co0.5Mn0.5O2 material as a promising cathode for sodium-ion batteries

    Science.gov (United States)

    Manikandan, Palanisamy; Heo, Seongwoo; Kim, Hyun Woo; Jeong, Hu Young; Lee, Eungje; Kim, Youngsik

    2017-09-01

    Layered Na0.5Co0.5Mn0.5O2 material is synthesized through a facile mixed hydroxy-carbonate route using (Co0.5Mn0.5)2(OH)2CO3 precursor and well characterized as a hexagonal layered structure under P63/mmc space group. The lattice parameters and unit cell volume (a = 2.8363 Å, c = 11.3152 Å and V = 78.83 Å3) are calculated by Rietveld refinement analysis. A flaky-bundle morphology is obtained to the layered Na0.5Co0.5Mn0.5O2 material with the hexagonal flake size ∼30 nm. Advanced transmission electron microscopic images are revealed the local structure of the layered Na0.5Co0.5Mn0.5O2 material with contrasting bright dots and faint dark dots corresponding to the Co/Mn and Na atoms. Two oxidation and reduction peaks are occurred in a cyclic voltammetric analysis corresponding to Co3+/Co4+ and Mn3+/Mn4+ redox processes. These reversible processes are attributed to the intercalation/de-intercalation of Na+ ions into the host structure of layered Na0.5Co0.5Mn0.5O2 material. Accordingly, the sodium cell is delivered the initial charge-discharge capacity 53/144 mAh g-1 at 0.5 C, which cycling studies are extended to rate capability test at 1 C, 3 C and 5C. Eventually, the Na-ion full-cell is yielded cathode charge-discharge capacity 55/52 mAh g-1 at 0.212 mA and exhibited as a high voltage cathode for Na-ion batteries.

  3. The development of the operational program for seismic monitoring system of Uljin Unit 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J.R.; Heo, T.Y.; Cho, B.H. [Korea Electric Power Research Institute, Taejeon (Korea, Republic of); Kang, T.G.; Kim, H.M.; Kim, Y.S.; Oh, S.M.; Kang, Y.S. [Korea Electric Power Data Network Co., Seoul (Korea, Republic of)

    1997-12-31

    Due to aging of the imported seismic monitoring system of Uljin of t 1 and 2 units it is difficult for this system to provide enough functions needed for the security of seismic safety and the evaluation of the earthquake data from the seismic instrumentation. For this reason, it is necessary to replace the seismic monitoring system of Uljin 1 and 2 units with a new system which has the localized and upgraded hardware and corresponding software. In the part of standardization of existing seismic monitoring system, furthermore, it is necessary to develop the seismic wave analysis system which incorporate newly developed software and can real-timely analyze the seismic wave. This report is the finial product of research project ``The development of the operational program for seismic monitoring system of Uljin Unit 1 and 2`` which have been performed from June 1996 to June 1997 by KEPRI and KDN. Main accomplishments - Review of regulatory criteria for seismic monitoring system -Analysis and upgrade of hardware system -Analysis and upgrade of software system - Development of seismic wave analysis system. (author). 17 refs., 49 figs., 6 tabs.

  4. Emergency operating instruction improvements at San Onofre Nuclear Generating Station Units 2 and 3

    International Nuclear Information System (INIS)

    Trillo, M.W.; Smith, B.H.

    1989-01-01

    In late 1987, San Onofre nuclear generating station (SONGS) began an extensive upgrade of the units 2 and 3 emergency operating instructions (EOIs). The original intent of this program was to incorporate revised generic guidance and to correct problems that were identified by operators. While this program was in progress, the US Nuclear Regulatory Commission (NRC) conducted a series of audits of emergency operating procedure (EOP) development and maintenance programs as 16 commercial nuclear facilities in the United States. These audits included four stations with Combustion Engineering-designed nuclear steam supply systems. (One of these audits included a review of preupgrade SONGS units 2 and 3 EOIs.) Significant industrywide comments resulted from these audits. The NRC has stated its intent to continue the review and audit of EOIs and the associated maintenance programs at all US commercial nuclear facilities. The units 2 and 3 EOI upgrade program developed procedural improvements and procedural program maintenance improvements that address many of the existing audit comments that have been received by the industry. Other resulting improvements may be useful in minimizing NRC comments in future such audits. Specific improvements are discussed. The upgrade program resulted in benefits that were not originally anticipated. The results of this program can be of significant use by other utilities in addressing the industrywide concerns that have been raised in recent NRC audits of EOP development and maintenance programs

  5. Large low field room temperature magneto-dielectric response from (Sr_0_._5Ba_0_._5)Nb_2O_6/Co(Cr_0_._4Fe_1_._6)O_4 bulk 3-0 composites

    International Nuclear Information System (INIS)

    Rathore, Satyapal Singh; Vitta, Satish

    2016-01-01

    Highlights: • The essential highlights of this work are;. • Bulk composite with varying amounts of relaxor and ferromagnetic phases has been synthesized by simple steps. • Processing yields an optimal structure with 30% ferromagnetic phase to couple the two ferroic orders. • Magneto dielectric constant shows large changes, 3.2%, at room temperature in moderate magnetic fields. • Large changes in dielectric constant are due to configurational arrangement of the two phases. - Abstract: Bulk magneto-dielectric composites with a 3-0 configuration comprised of ferroelectric-magnetostrictive phases have been synthesized using (Sr_0_._5Ba_0_._5)Nb_2O_6–Co(Cr_0_._4Fe_1_._6)O_4 as the two constituents, respectively. The ferroelectric phase made by a dual stage sintering process has a uniform grain size of 15 μm while the magnetostrictive phase has a grain size of 2–3 μm. Composites synthesized by conventional solid state processing using these two constituents exhibit large magneto-dielectric coupling at room temperature which increases with increasing magnetic field. The composite with 30% magnetostrictive phase distributed uniformly in the ferroelectric phase has the most desirable microstructure and exhibits a large coupling with 3.2% change in the dielectric constant at 1 kHz and 8 kOe magnetic field. This change in dielectric constant was found to be a maximum with respect to variation of the fraction of magnetostrictive phase, indicating that 30% is the optimal value to realize large coupling between the two phases. The decrease in magneto-dielectric constant upon application of an external magnetic field is possibly due to the inherent magnetoresistance of the magnetic component. The resistivity of the magnetic component decreases in an external magnetic field leading to the formation of 3D percolating conducting paths. This causes the coupling to decrease in composites with >30% magnetostrictive phase.

  6. Final Environmental Statement related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1989-10-01

    In September 1981, the staff of the Nuclear Regulatory Commission (NRC) issued its Final Environmental Statement (NUREG-0775) related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446), located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. The NRC has prepared this supplement to NUREG-0775 to present its evaluation of the alternative of operating Comanche Peak with the installation of further severe-accident-mitigation design features. The NRC has discovered no substantial changes in the proposed action as previously evaluated in the Final Environmental Statement that are relevant to environmental concerns and bearing on the licensing of Comanche Peak Steam Electric Station, Units 1 and 2. 6 refs., 3 tabs

  7. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.

    1982-02-01

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  8. Licensed operating reactors. Status summary report data as of May 31, 1985. Vol. 9, No. 6

    International Nuclear Information System (INIS)

    1985-07-01

    This report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management from the Headquarters staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, IE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  9. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement No. 4

    International Nuclear Information System (INIS)

    1985-05-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the applicant) for licenses to operate the Limerick Generating Station, Units 1 and 2 located on a site in Montgomery and Chester Counties, Pennsylvania. A license (NPF-27) for the operation of Limerick Unit 1 was issued on October 26, 1984. The license, which was restricted to a five percent power level, contained conditions which required resolution prior to proceeding beyond the five percent power level. This Supplement 4 to the SER addresses some of those technical issues and their associated license conditions which require resolution prior to proceeding beyond the five percent power level. The remaining issues to be addressed prior to proceeding beyond the five percent power level will be addressed in a later supplement to this report. This Supplement 4 to the SER also contains the comments made by the Advisory Committee on Reactor Safeguards in its report dated November 6, 1984, regarding full power operation of Limerick Unit 1

  10. Article separation apparatus and method for unit operations

    Science.gov (United States)

    Pardini, Allan F.; Gervais, Kevin L.; Mathews, Royce A.; Hockey, Ronald L.

    2010-06-22

    An apparatus and method are disclosed for separating articles from a group of articles. The apparatus includes a container for containing one or more articles coupled to a suitable fluidizer for suspending articles within the container and transporting articles to an induction tube. A portal in the induction tube introduces articles singly into the induction tube. A vacuum pulls articles through the induction tube separating the articles from the group of articles in the container. The apparatus and method can be combined with one or more unit operations or modules, e.g., for inspecting articles, assessing quality of articles, or ascertaining material properties and/or parameters of articles, including layers thereof.

  11. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  12. The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research Into Operations for America's Space Program

    Science.gov (United States)

    Madura, John T.; Bauman, William H., III; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.

    2011-01-01

    The Applied Meteorology Unit (AMU) provides technology development and transition services to improve operational weather support to America's space program . The AMU was founded in 1991 and operates under a triagency Memorandum of Understanding (MOU) between the National Aeronautics and Space Administration (NASA), the United States Air Force (USAF) and the National Weather Service (NWS) (Ernst and Merceret, 1995). It is colocated with the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS) and funded by the Space Shuttle Program . Its primary customers are the 45WS, the Spaceflight Meteorology Group (SMG) operated for NASA by the NWS at the Johnson Space Center (JSC) in Houston, TX, and the NWS forecast office in Melbourne, FL (MLB). The gap between research and operations is well known. All too frequently, the process of transitioning research to operations fails for various reasons. The mission of the AMU is in essence to bridge this gap for America's space program.

  13. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC

    Directory of Open Access Journals (Sweden)

    Mohammad Javad Abdollahi

    2015-08-01

    Full Text Available In this paper security constraints unit commitment (SCUC in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested for many researchers and network operators. Using Electrical Vehicles (PEVs and wind power for energy production is one of the newest proposed methods for replacing fossil fuels.One of the effective strategies for analyzing of the effects of Vehicle 2 Grid (V2G and wind power in optimal operation of generation is running of SCUC for power systems that are equipped with V2G and wind power resources. In this paper, game theory method is employed for deterministic solution of day-ahead unit commitment with considering security constraints in the simultaneous presence of V2G and wind power units. This problem for two scenarios of grid-controlled mode and consumer-controlled mode in three different days with light, medium and heavy load profiles is analyzed. Simulation results show the effectiveness of the presence of V2G and wind power for decreasing of generation cost and improving operation indices of power systems.

  14. Limited field investigation report for the 100-NR-1 Operable Unit

    International Nuclear Information System (INIS)

    1995-03-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-NR-1 Source Operable Unit LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land-use scenarios. This report is unique in that it is based on Hanford-specific agreements discussed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992), the Hanford Site Risk Assessment Methodology (DOE-RL 1994a), the Remedial Investigation Feasibility Study Work Plan for the 100-NR-1 Operable Unit (DOE-RL 1992a), and the Hanford Past-Practice Strategy (HPPS) (DOE-RL 1991), and must be viewed in this context. The HPPS emphasizes initiating and completing waste site cleanup through interim actions. The strategy includes paths for interim decision-making and a final remedy-selection process for the operable unit. A LFI report is required, in accordance with the HPPS, when waste sites are to be considered for IRM and existing data are insufficient to formulate a conceptual model or perform a QRA. The purpose of the report is to identify those sites that are recommended to remain as candidates for IRM, provide a preliminary summary of site characterization studies, refine the conceptual model as needed, identify potential contaminant- and location-specific applicable or relevant and appropriate requirements (ARAR), and provide a qualitative assessment of the risks associated with the sites. This assessment includes consideration of whether contaminant concentrations pose a risk to human health or the environment that warrants action through IRM

  15. A Moveable Feast--A Progressive Approach to the Unit Operations Laboratory

    Science.gov (United States)

    Conner, Wm. Curtis, Jr.; Hammond, Karl D.; Laurence, Robert L.

    2011-01-01

    The authors describe an alternative format for the senior laboratory in which students are allowed--indeed, expected--to communicate with previous groups and build on their results. The effect is a unit operations laboratory in which students are empowered to propose the experiments they wish to do and in which the cumulative experience of the…

  16. Use of Special Operations Forces in United Nations Missions: a Method to Resolve Complexity

    Science.gov (United States)

    2015-05-21

    physical stamina and psychological stability, followed by a rigorous training program are the imperatives to create SOF soldiers.42 Mark Bowden in...recommendation is that the United Nations should establish a Special Operations planning cell within the UN Department of Peacekeeping Operations. As of...now, the cell is nonexistent. This cell should be able to facilitate the integration of SOF into the overall peace operations concept. Finally, the

  17. Applications of the monitor of loose parts in the cycle 6 of the Laguna Verde Unit 2 power plant

    International Nuclear Information System (INIS)

    Calleros, G.; Mendez, A.; Gomez, R.A.; Castillo, R.; Bravo, J.M.

    2004-01-01

    The monitor of loose parts (Loose Parts Monitoring System) installed in the Unit 2 of the Laguna Verde Central is a tool to detect strange objects or parts loose in the system of refrigeration of the reactor that could be impacted in the walls of the recirculation knots or in the internal of the reactor. In this work two applications are shown carried out with the Monitor of Loose Parts, determining the characteristics of the stable nominal conditions, those which when changing, they are used to diagnose during the Cycle 6 of the Unit 2, failures in the components of the the recirculation circuits or to identify mechanical vibrations of the recirculation knots induced by a flow of recirculation bistable associated to operative conditions of the reactor. (Author)

  18. Radiation exposure of operator during various interventional procedures

    International Nuclear Information System (INIS)

    Yu, In Kyu; Chung, Jin Wook; Han, Joon Koo; Park, Jae Hyung; Kang, Wee Saing

    1994-01-01

    To investigate the levels of radiation exposure of an operator which may be influenced by the wearing an apron, type of procedure, duration of fluoroscopy and operator's skill during various interventional procedures. Radiation doses were measured both inside and outside the apron(0.5 mm lead equivalent) of the operator by a film badge monitoring method and the duration of fluoroscopy was measured in 96 procedures prospectively. The procedures were 30 transcatheter arterial embolization (TAE), 25 percutaneous transhepatic biliary drainages (PTBD), 16 stone removals (SR), 15 percutaneous needle aspirations (PNCA) and 10 percutaneous nephrostomies(PCN). To assess the difference of exposure by the operator's skill, the procedures of TAE and PTBD were done separately by groups of staffs and residents. Average protective effect of the apron was 72.8%. Average radiation exposure(unit: μ Sv/procedure was 23.3 in PTBD by residents, 10.0 in PTBD by staffs, 10.0 in SR, 8.7 in TAE by residents, 7.3 in TAE by staffs, 9.0 in PCN and 6.0 in PCNA. Average radiation exposure of residents were 1.9 times greater than those of staffs. Radiation exposure was not proportionally related to the duration of fluoroscopy, but influenced by wearing an apron, various types of procedure and operator's skills

  19. Qualitative risk assessment for the 100-FR-1 source operable unit

    International Nuclear Information System (INIS)

    Corporation, I.T.

    1994-08-01

    This report provides the Qualitative risk assessment (QRA) for the waste sites associated with the 100-FR-1 Operable Unit. The QRA is an evaluation of risk for a predefined set of human and ecological exposure scenarios. It is not intended to replace or be a substitute for a baseline risk assessment. The QRA is streamlined to consider only two human health scenarios (frequent-and occasional-use) with four exposure pathways (soil ingestion, fugitive dust inhalation, inhalation of volatile organics, and external radiation exposure) and a limited ecological evaluation. The use of these scenarios and pathways was agreed to by the 100 Area Tri-Party unit managers

  20. Engineering evaluation/conceptual plan for the 200-UP-1 groundwater operable unit interim remedial measure

    International Nuclear Information System (INIS)

    Myers, D.A.; Swanson, L.C.; Weeks, R.S.; Giacinto, J.; Gustafson, F.W.; Ford, B.H.; Wittreich, C.; Parnell, S.; Green, J.

    1995-04-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (ERM) to address a uranium and technetium-99 groundwater plume and an associated nitrate contamination plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need and potentially achievable objectives and goals for an IRM and evaluates alternatives to contain elevated concentrations of uranium, technetium-99, nitrate, and carbon tetrachloride and to obtain information necessary to develop final remedial actions for the operable unit

  1. Atomic scale investigation of planar defects in 0.95Na{sub 0.5}Bi{sub 0.5}TiO{sub 3}–0.05BaTiO{sub 3} thin films on SrTiO{sub 3} (001) substrates

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Xiao-Wei; Lu, Lu [The School of Electronic and Information Engineering, Xi' an Jiaotong University, Xi' an 710049 (China); Mi, Shao-Bo, E-mail: shaobo.mi@mail.xjtu.edu.cn [State Key Laboratory for Mechanical Behavior of Materials, Xi' an Jiaotong University, Xi' an 710049 (China); Cheng, Sheng; Liu, Ming [The School of Electronic and Information Engineering, Xi' an Jiaotong University, Xi' an 710049 (China); Jia, Chun-Lin [The School of Electronic and Information Engineering, Xi' an Jiaotong University, Xi' an 710049 (China); Peter Grünberg Institute and Ernst Ruska Center for Microscopy and Spectroscopy with Electrons, Forschungszentrum Jülich, D-52425 Jülich (Germany)

    2016-08-15

    Thin films of lead-free piezoelectric 0.95Na{sub 0.5}Bi{sub 0.5}TiO{sub 3}–0.05BaTiO{sub 3} (0.95NBT–0.05BT) are epitaxially grown on single crystalline SrTiO{sub 3} (001) substrates at 800 °C, 850 °C and 900 °C, respectively, by a high-pressure sputtering deposition technique. The microstructure of the thin films is investigated by means of aberration-corrected scanning transmission electron microscopy. Planar defects are observed and the density of the defects increases with the increase of the film-growth temperature. Two types of planar defects in the films are studied at the atomic scale. One consists of groups of edge-sharing TiO{sub 6} octahedra with Bi atoms located between the TiO{sub 6} octahedral groups, and the other exists in the form of Na/Bi(Ba)−O{sub 2}−Na/Bi(Ba) layer parallel to the (010) plane of the films. Based on the structure feature of the planar defects, the propagation of the planar defects related to edge-sharing TiO{sub 6} octahedra within the films and from the film-substrate interface is discussed. Furthermore, the ordering of the planar defects is expected to form new structures. In comparison with the microstructure of 0.95NBT–0.05BT bulk materials, the appearance of the high-density planar defects observed within the films could be considered to be responsible for the difference in the physical properties between the bulk materials and the films. - Highlights: • NBT–BT films have been successfully prepared on SrTiO{sub 3} (001) substrates. • Complex planar defects of zigzag-like and Aurivillius-type have been determined. • The propagation of the planar defects in the films has been characterized. • The intergrowth of planar faults with NBT–BT structure units results in the formation of new structures. • The NBT–BT/SrTiO{sub 3} interface structure has been determined at the atomic scale.

  2. Cost and Operational Effectiveness Analysis of Aiternative Force Structures for Fulfillment of the United States Marine Corps Operational Support Airlift and Search and Rescue Missions

    National Research Council Canada - National Science Library

    Chase, Eric

    2000-01-01

    This thesis provides a preliminary cost and operational effectiveness analysis of alternative force structures for the United States Marine Corps operational support airlift and search and rescue missions...

  3. Licensed operating reactors. Status summary report, data as of 6-30-84. Volume 8, No. 7

    International Nuclear Information System (INIS)

    1984-08-01

    This monthly report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States. The percentage computations, the vendor capacity factors, and actual vs potential energy production are computed using actual data for the period of consideration. The percentages listed in power generation are computed as an arithmetic average. The factors for the life-span of each unit (the Cumulative column) are reported by the utility and are not entirely re-computed by NRC. Utility power production data are checked for consistency with previously submitted statistics

  4. Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2007-05-09

    This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

  5. The continuous-wave passive mode-locking operation of a diode-pumped mixed Nd:Lu0.5Y0.5VO4 laser

    International Nuclear Information System (INIS)

    Huang, H-T; Xu, J-L; He, J-L; Zhang, S-Y; Xu, J-Q; Zhao, B

    2011-01-01

    We reported a continuous-wave (CW) passively mode-locked Nd:Lu 0.5 Y 0.5 VO 4 laser at 1064 nm. A partially reflective semiconductor saturable absorber mirror was exploited in the Z-typed resonator. The Nd:Lu 0.5 Y 0.5 VO 4 laser generated CW mode-locked pulses with an average output power of 860 mW, a repetition rate of 53.7 MHz, and a pulse duration of 8.7 ps

  6. Geophysical Investigation of the 618-10 and 618-11 Burial Grounds, 300-FF-2 Operable Unit

    International Nuclear Information System (INIS)

    Bergstrom, K.A.; Bolin, D.J.; Mitchell, T.H.

    1997-09-01

    This document summarizes the results of geophysical investigations conducted at two radioactive solid waste burial grounds, 618-10 and 618-11. The burial grounds are located approximately 4.5 miles and 7 miles north of the 300 Area, respectively. These sites are within the 300-FF-2 Operable Unit, where geophysical techniques are being used to characterize the distribution of solid waste in the subsurface as part of the Limited Field Investigations for this operable unit

  7. Compex system for teaching and training operators for TPP and NPP power units

    International Nuclear Information System (INIS)

    Tsiptsyura, R.D.

    1985-01-01

    Requirements, taken as a principle for constructing the system for operator teaching and training (OTT), have been formulated on the basis of investigation of operators' work at TPP and NPP power units. Functional structure and a structural block-diagram for OTT are built. As a criterion, which determines the structure of any trainers, being a part of OTT a requirement has been chosen satisfying the correspondence beetween habits developed with the help of trainers and habits of real operators' work. Results of analysis permit to confirm that refusal or under statement of the role of any stage of operator training leads to reduction of quality of his training

  8. 5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system

    CERN Document Server

    Ferlin, G; Claudet, S; Pezzetti, M

    2015-01-01

    Since 2009, the Large Hadron Collider (LHC) is in operation at CERN. The LHC superconducting magnets distributed over eight sectors of 3.3-km long are cooled at 1.9 K in pressurized superfluid helium. The nominal operating temperature of 1.9 K is produced by eight 1.8-K refrigeration units based on centrifugal cold compressors (3 or 4 stages depending to the vendor) combined with warm volumetric screw compressors with sub-atmospheric suction. After about 5 years of continuous operation, we will present the results concerning the availability for the final user of these refrigeration units and the impact of the design choice on the recovery time after a system trip. We will also present the individual results for each rotating machinery in terms of failure origin and of Mean Time between Failure (MTBF), as well as the consolidations and upgrades applied to these refrigeration units.

  9. 5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system

    Science.gov (United States)

    Ferlin, G.; Tavian, L.; Claudet, S.; Pezzetti, M.

    2015-12-01

    Since 2009, the Large Hadron Collider (LHC) is in operation at CERN. The LHC superconducting magnets distributed over eight sectors of 3.3-km long are cooled at 1.9 K in pressurized superfluid helium. The nominal operating temperature of 1.9 K is produced by eight 1.8-K refrigeration units based on centrifugal cold compressors (3 or 4 stages depending to the vendor) combined with warm volumetric screw compressors with sub-atmospheric suction. After about 5 years of continuous operation, we will present the results concerning the availability for the final user of these refrigeration units and the impact of the design choice on the recovery time after a system trip. We will also present the individual results for each rotating machinery in terms of failure origin and of Mean Time between Failure (MTBF), as well as the consolidations and upgrades applied to these refrigeration units.

  10. Results of toxicity tests and chemical analyses conducted on sediments collected from the TNX Outfall Delta Operable Unit, July 1999

    International Nuclear Information System (INIS)

    Specht, W.L.

    2000-01-01

    In order to provide unit specific toxicity data that will be used to address critical uncertainty in the ecological risk assessment (ERA) for the TNX Outfall Delta Operable Unit (TNXOD OU), sediments were collected from eight locations in the Inner Swamp portion of the operable unit and two unit specific background locations. These samples were analyzed for total mercury, total uranium, and sediment toxicity

  11. Main problems experienced on diesel generators of French 900 MWe operating units

    Energy Technology Data Exchange (ETDEWEB)

    Dredemis, Geoffroy; Jude, Francois [Commissariat a l' Energie Atomique, centre d' Etudes Nucleaires de Fontenay-aux-Roses, Institut de Protection et Surete Nucleaire, Departement d' Analyse de Surete, B.P. No. 6, 92260 Fontenay-aux-Roses (France)

    1986-02-15

    Each unit of all the French nuclear power plant is equipped with two diesel emergency generator sets., For the totality of standards PWRs of 900 MWe, they are identical. We present in this communication the most significative failures met with diesel engines on operating units, such as rupture of fuel injection pipes, breaking of the connecting rods, and cylinder lubrication failures. All these incidents, which affected the emergency power sources of concerned units, had generic characteristics. In view of their potential consequences, it was proceeded in each case to an immediate control of the components concerned of all PWR 900 MWe diesel engines. At the same time, studies were started as to what modifications would permit to solve rapidly each one of the problems met with. (authors)

  12. Computer Drawing Method for Operating Characteristic Curve of PV Power Plant Array Unit

    Science.gov (United States)

    Tan, Jianbin

    2018-02-01

    According to the engineering design of large-scale grid-connected photovoltaic power stations and the research and development of many simulation and analysis systems, it is necessary to draw a good computer graphics of the operating characteristic curves of photovoltaic array elements and to propose a good segmentation non-linear interpolation algorithm. In the calculation method, Component performance parameters as the main design basis, the computer can get 5 PV module performances. At the same time, combined with the PV array series and parallel connection, the computer drawing of the performance curve of the PV array unit can be realized. At the same time, the specific data onto the module of PV development software can be calculated, and the good operation of PV array unit can be improved on practical application.

  13. Combustion synthesis and characterization of MV0.5P0.5O4: Sm3+, Tm3+ (M = Gd, La, Y)

    Science.gov (United States)

    Motloung, Selepe J.; Lephoto, Mantwa A.; Tshabalala, Kamohelo G.; Ntwaeaborwa, Odireleng M.

    2018-04-01

    In this paper, GdV0.5P0.5O4: Sm3+, Tm3+, LaV0.5P0.5O4: Sm3+, Tm3+ and YV0.5P0.5O4: Sm3+, Tm3+ phosphor powders were prepared by solution combustion method using urea as a fuel. The phase purity, surface morphology, optical and photoluminescence properties were investigated by X-ray diffraction (XRD), scanning electron microscopy (SEM), UV-vis spectroscopy and photoluminescence spectroscopy. The XRD results indicated that the prepared powders are of a single phase and crystallized in tetragonal structure for Gd and Y systems while monoclinic phase was observed for La system. SEM showed that the samples consisted of mixed structures. The estimated band gaps were 2.2, 2.4 and 2.3 eV for Y, Gd and La systems respectively. The photoluminescence results showed four emission peaks. One peak is assigned to 1G4 - 3H6 transition of Tm3+, and three other emission peaks are attributed to 6G5/2 - 6H5/2, 6G5/2 - 6H7/2 and 6G5/2 - 6H9/2 transitions of Sm3+. The photoluminescent intensity was the highest in the gadolinium system.

  14. Photoluminescence and scintillation properties of Ce-doped Sr2(Gd1-xLux)8(SiO4)6O2 (x = 0.1, 0.2, 0.4, 0.5, 0.6) crystals

    Science.gov (United States)

    Igashira, Takuya; Kawano, Naoki; Okada, Go; Kawaguchi, Noriaki; Yanagida, Takayuki

    2018-05-01

    Apatite crystals with chemical compositions of 0.5% Ce-doped Sr2(Gd1-xLux)8(SiO4)6O2 (x = 0.1, 0.2, 0.4, 0.5, 0.6) were synthesized by the Floating Zone method, and then we evaluated their photoluminescence (PL) and scintillation properties. All the Ce-doped samples exhibited PL and scintillation with an intense broad emission in 400-550 nm in which the origin was attributed to the 5d-4f transition of Ce3+, and the emission peak became broader with increasing the concentration of Lu3+. Both PL and scintillation decay time profiles were best-approximated by a sum of two exponential decay functions, and the origin of slower component was attributed to the 5d-4f transition of Ce3+. In the X-ray induced afterglow measurements, the Ce-doped Sr2(Gd0.4Lu0.6)8(SiO4)6O2 sample exhibited the lowest afterglow level. Furthermore, the Ce-doped Sr2(Gd0.5Lu0.5)8(SiO4)6O2 and Sr2(Gd0.4Lu0.6)8(SiO4)6O2 samples showed a clear full energy deposited peak under 5.5 MeV 241Am α-ray irradiation, and the estimated absolute scintillation light yields were around 290 and 1300 ph/5.5 MeV-α, respectively.

  15. Annual Summary Report, February to December 1998, for the 100-HR-3 and 100-KR-4 Pump-and-Treat Operations and Operable Units

    International Nuclear Information System (INIS)

    Boutin, R. J.

    1999-01-01

    This annual summary report discusses the interim remedial actions at the 100-HR-3 and 100-KR-4 Operable Units (OUs) for February 1,1998, through December 31, 1998. This is the second annual summary report that has been submitted for these OUs; the first report was released in April 1998 (DOE-RL 1998). Ongoing annual summaries and performance evaluations of each of the pump-and-treat systems are required by the Remedial Design Report and Remedial Action Work Plan for the 100-HR-3 and 100-KR-4 Groundwater Operable Units' Interim Action (RDR/RAWP) (DOE-RL 1996)

  16. Changing priorities of codes and standards: An A/E's perspective for operating units and new generation

    International Nuclear Information System (INIS)

    Meyers, B.L.; Jackson, R.W.; Morowski, B.D.

    1994-01-01

    As the nuclear power industry has shifted emphasis from the construction of new plants to the reliability and maintenance of operating units, the industry's commitment to safety has been well guarded and maintained. Many other important indicators of nuclear industry performance are also positive. Unfortunately, by some projections, as many as 25 operating nuclear units could prematurely shutdown because of increasing O ampersand M and total operating costs. The immediate impact of higher generating costs on the nuclear industry is evident. However, when viewed over the longer-term, high generating costs will also affect license renewals, progress in the development of advanced light water reactor designs and prospects for a return to the building of new plants. Today's challenge is to leverage the expertise and contribution of the nuclear industry partner organizations to steadily improve the work processes and methods necessary to reduce operating costs, to achieve higher levels in the performance of operating units, and to maintain high standards of technical excellence and safety. From the experience and perspective of an A/E and partner in the nuclear industry, this paper will discuss the changing priorities of codes and standards as they relate to opportunities for the communication of lessons learned and improving the responsiveness to industry needs

  17. The quinternary thiophosphate Cs0.5Ag0.5Nb2PS10

    Directory of Open Access Journals (Sweden)

    Sojeong Park

    2010-07-01

    Full Text Available The quinternary thiophosphate Cs0.5Ag0.5Nb2PS10, cesium silver tris(disulfido[tetrathiophosphato(V]diniobate(IV, has been prepared from the elements using a CsCl flux. The crystal structure is made up of ∞1[Nb2PS10] chains expanding along [010]. These chains are built up from bicapped trigonal-prismatic [Nb2S12] units and tetrahedral [PS4] groups and are linked through a linear S—Ag—S bridge, forming a two-dimensional layer. These layers then stack on top of each other, completing the three-dimensional structure with an undulating van der Waals gap. The disordered Cs+ ions reside on sites with half-occupation in the voids of this arrangement. Short [2.8843 (5 Å] and long [3.7316 (4 Å] Nb—Nb distances alternate along the chains, and anionic S22− and S2− species are observed. The charge balance of the compound can be represented by the formula [Cs+]0.5[Ag+]0.5[Nb4+]2[PS43−][S22−]3.

  18. Prevalence of Giardia duodenalis assemblages in weaned cattle on cow-calf operations in the United States.

    Science.gov (United States)

    Santin, Monica; Dargatz, David; Fayer, Ronald

    2012-02-10

    To determine the prevalence of Giardia duodenalis in weaned beef calves on cow-calf operations in the United States, fecal specimens were collected from 819 calves (6-18 months of age) from 49 operations. After cleaning and concentration procedures to maximize recovery of cysts from feces, DNA was extracted from each of the 819 specimens. The presence of G. duodenalis was determined by nested PCR of a fragment of the SSU rRNA gene. All positive PCR products were subjected to sequence analysis. The overall sample level prevalence of Giardia was 33.5% with prevalence ranging from 0 to 100% among operations. The highest within herd prevalence of infected beef calves was found in one cow-calf operation from the South region (100%), followed by a cow-calf operation from the West region (90%), and three cow-calf operations from the Midwest region (87.5, 85, and 85%). Giardia was not detected in samples from 7 operations including 5 cow-calf operations from the South region, and 1 cow-calf operation each from the Midwest and West regions. Molecular analysis of the Giardia-positive samples identified assemblage E (or E-like) in 31.7% of all samples (260/819) and assemblage A in 1.2% (10/819). A mixed infection with assemblages A and E was observed in four calves from an operation in Midwest region. The potentially zoonotic assemblage A was detected in specimens from four operations in Midwest region. These findings indicate that most G. duodenalis found in weaned beef calves was assemblage E which represents no known zoonotic threat. However, the presence of assemblage A in a small number of animals poses a potential risk of infection to humans. Published by Elsevier B.V.

  19. SPOKEN CUZCO QUECHUA, UNITS 1-6.

    Science.gov (United States)

    SOLA, DONALD F.; AND OTHERS

    THE MATERIALS IN THIS VOLUME COMPRISE SIX UNITS WHICH PRESENT BASIC ASPECTS OF CUZCO QUECHUA PHONOLOGY, MORPHOLOGY, AND SYNTAX FOR THE BEGINNING STUDENT. THE SIX UNITS ARE DESIGNED FOR APPROXIMATELY 120 HOURS OF SUPERVISED CLASS WORK WITH OUTSIDE PREPARATION EXPECTED OF THE STUDENT. EACH UNIT CONSISTS OF A DIALOGUE TO BE MEMORIZED, A DIALOGUE…

  20. 33 CFR 17.05-5 - Acceptance and disbursement of gifts.

    Science.gov (United States)

    2010-07-01

    ... gifts. 17.05-5 Section 17.05-5 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY GENERAL UNITED STATES COAST GUARD GENERAL GIFT FUND Administration § 17.05-5 Acceptance and disbursement of gifts. (a) The immediate receiving person shall give a proper receipt on the proper form used...

  1. Specific heat measurements of TiB2 and 6LiF from 0.5 to 30 K

    International Nuclear Information System (INIS)

    Lang, Brian E.; Donaldson, Marcus H.; Woodfield, Brian F.; Burger, Arnold; Roy, Utupal N.; Lamberti, Vincent; Bell, Zane W.

    2005-01-01

    The specific heats of TiB 2 and 6 LiF have been measured from 0.5 to 30 K as part of a larger project in the construction of a neutron spectrometer. For this application, the measured specific heats were used to extrapolate the specific heats down to 0.1 K with lattice, electronic, and Schottky equations for the respective samples. The resultant specific heat values at 0.1 K for TiB 2 and 6 LiF are 4.08 x 10 -4 ± 0.27 x 10 -4 J/K/mol and 9.19 x 10 -9 ± 0.15 x 10 -9 J/K/mol, respectively

  2. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1994-03-01

    In the third quarter of 1993, all of Finland's four nuclear power plant units were in power operation, with the exception of the annual maintenance outages of the Loviisa units. The load factor average of the plant units was 83.6 %. None of the events which occurred during this annual quarter had any bearing on nuclear or radiation safety. (4 figs., 5 tabs.)

  3. Freeze drying synthesis of LiNi0.5Mn0.5O2 cathode materials

    International Nuclear Information System (INIS)

    Shlyakhtin, O.A.; Yoon, Young Soo; Choi, Sun Hee; Oh, Young-Jei

    2004-01-01

    The influence of several processing conditions on the phase formation and electrochemical performance of LiNi 0.5 Mn 0.5 O 2 powders, obtained by freeze drying method, is studied. Thermal processing in pellets at maximum heating rate promotes better crystallographic ordering of hexagonal LiNi 0.5 Mn 0.5 O 2 and maximum capacity values irrespectively of chemical composition of the precursor. Instead, intense mechanical processing of precursors exerts considerable negative effect on the electrochemical performance. Cathode materials containing superstoichiometric amount of lithium (Li 1.3 Mn 0.5 Ni 0.5 O 2+δ ) demonstrate reversible capacity values up to 190 mAh/g between 2.5 and 4.6 V

  4. 50 CFR 453.05 - Committee meetings.

    Science.gov (United States)

    2010-10-01

    ... OF COMMERCE); ENDANGERED SPECIES COMMITTEE REGULATIONS ENDANGERED SPECIES EXEMPTION PROCESS ENDANGERED SPECIES COMMITTEE § 453.05 Committee meetings. (a) The committee shall meet at the call of the... Wildlife and Fisheries JOINT REGULATIONS (UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE...

  5. Chapter 6. Protection of patients and staff during a pandemic. Recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza epidemic or mass disaster

    NARCIS (Netherlands)

    Taylor, Bruce L.; Montgomery, Hugh E.; Rhodes, Andrew; Sprung, Charles L.; Christian, Michael D.; Camargo, Ruben; Ceraso, Daniel; Azoulay, Elie; Duguet, Alexandre; Guery, Benoit; Reinhart, Konrad; Adini, Bruria; Barlavie, Yaron; Benin-Goren, Odeda; Cohen, Robert; Klein, Motti; Leoniv, Yuval; Margalit, Gila; Rubinovitch, Bina; Sonnenblick, Moshe; Steinberg, Avraham; Weissman, Charles; Wolff, Donna; Kesecioglu, Jozef; de Jong, Menno; Moreno, Rui; An, Youzhong; Du, Bin; Joynt, Gavin M.; Colvin, John; Loo, Shi; Richards, Guy; Artigas, Antonio; Pugin, Jerome; Amundson, Dennis; Devereaux, Asha; Beigel, John; Danis, Marion; Farmer, Chris; Hick, John L.; Maki, Dennis; Masur, Henry; Rubinson, Lewis; Sandrock, Christian; Talmor, Daniel; Truog, Robert; Zimmerman, Janice; Brett, Steve; Montgomery, Hugh; Sanderson, Frances

    2010-01-01

    To provide recommendations and standard operating procedures (SOPs) for intensive care unit (ICU) and hospital preparations for an influenza pandemic or mass disaster with a specific focus on protection of patients and staff. Based on a literature review and expert opinion, a Delphi process was used

  6. 200-BP-11 operable unit and 216-B-3 main pond work/closure plan, Hanford Site, Richland, Washington. Volume 1: Field investigation and sampling strategy

    International Nuclear Information System (INIS)

    1994-09-01

    This document coordinates a Resource Conservation and Recovery Act (RCRA) past-practice work plan for the 200-BP-11 Operable Unit and a RCRA closure/postclosure plan for the 216-B-3 Main Pond and 216-B-3-3 Ditch [treatment, storage, and/or disposal (TSD) unit]. Both RCRA TSD and past-practice waste management units are contained within the 200-BP-11 Operable Unit. The 200-BP-11 Operable Unit is a source operable unit located on the east side of the B Plant Source Aggregate Area in the 200 East Area of the Hanford Site. The operable unit lies just east of the 200 East Area perimeter fence and encompass approximately 476 hectares (1,175 acres). Source operable units include waste management units that are potential sources of radioactive and/or hazardous substance contamination. Source waste management units are categorized in the Hanford Federal Facility Agreement and Consent Order as either RCRA TSD, RCRA past-practice, or Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) past-practice. As listed below and in the Tri-Party Agreement, the 200-BP-11 Operable Unit contains five RCRA past-practice and five RCRA TSD waste management units. Additionally, for RCRA TSD permitting purposes, the RCRA TSD waste management units are subdivided into two RCRA TSD units

  7. Approach and plan for cleanup actions in the 100-FR-2 operable unit of the Hanford Site, Revision 0

    International Nuclear Information System (INIS)

    1995-06-01

    A new administrative approach is being used to reach a cleanup decision for the 100-FR-2 Operable Unit. The unit, located at the 100-F Area, contains solid waste sites and is one of the remaining operable units scheduled for characterization and cleanup in the 100 Area. This Focus Package (1) describes the new approach and activities needed to reach a decision on cleanup actions for the 100-FR-2 Operable Unit and (2) invites public participation into the planning process. The previous approach included the production of a Work Plan, a Limited Field Investigation Report, a Qualitative Risk Assessment, a Focused Feasibility Study, and a Proposed Plan, all culminating in an interim action Record of Decision. Information gathered to date on other operable units allows the analgous site approach to be used on the 100-FR-2 Operable Unit, and therefore, a reduction in documentation preparation. The U.S. Environmental Protection Agency, Washington State Department of Ecology, and the U.S. Department of Energy (Tri-Party Agreement) believe that the new approach will save time and funding. In the new approach, the Work Plan has been condensed into this 12 page Focus Package. The Focus Package includes a summary of 100-F Area information, a list of waste sites in the 100-FR-2 Operable Unit, a summary of proposed work, and a schedule. The new approach will also combine the Limited Field Investigation and Qualitative Risk Assessment reports into the Focused Feasibility Study. The Focused Feasibility Study will analyze methods and costs to clean up waste sites. Consolidating the documents should reduce the time to complete the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process by 16 months, compared to the previous approach

  8. Coordinating bifurcated remediation of soil and groundwater at sites containing multiple operable units

    International Nuclear Information System (INIS)

    Laney, D.F.

    1996-01-01

    On larger and/or more complex sites, remediation of soil and groundwater is sometimes bifurcated. This presents some unique advantages with respect to expedited cleanup of one medium, however, it requires skillful planning and significant forethought to ensure that initial remediation efforts do not preclude some long-term options, and/or unduly influence the subsequent selection of a technology for the other operable units and/or media. this paper examines how the decision to bifurcate should be approached, the various methods of bifurcation, the advantages and disadvantages of bifurcation, and the best methods to build flexibility into the design of initial remediation systems so as to allow for consideration of a fuller range of options for remediation of other operable units and/or media at a later time. Pollutants of concern include: metals; petroleum hydrocarbons; and chlorinated solvents

  9. Retrofitting and operation solid radwaste system Dresden Station, Units 2 and 3

    International Nuclear Information System (INIS)

    Testa, J.; Homer, J.C.

    1982-01-01

    Units 2 and 3 at Dresden Station are twin 794 MW (net) BWR units that became operational in 1970 and 1971. The waste streams are typical of BWR stations, namely, bead resin and filter sludge (powdered resins and diatomaceous earth), evaporator concentrate containing approximately 25% dissolved solids and dry active waste. The original solid radwaste system utilized cement for solidification in open top 55 gallon drums. Remote handling was provided by means of a monorail with moving platforms supporting the drums. A relatively light-weight compactor was used to compact DAW into 55 gallon drums. Difficulties were experienced with this system

  10. Ambiguity in Units and the Referents: Two Cases in Rational Number Operations

    Science.gov (United States)

    Rathouz, Margaret

    2010-01-01

    I explore the impact of ambiguous referral to the unit on understanding of decimal and fraction operations during episodes in two different mathematics courses for pre-service teachers (PSTs). In one classroom, the instructor introduces a rectangular area diagram to help the PSTs visualize decimal multiplication. A transcript from this classroom…

  11. Description of work for 100-DR-2 Operable Unit Vadose Drilling/test pits

    International Nuclear Information System (INIS)

    Naiknimbalkar, N.

    1993-01-01

    This report describes the scope of work for the boreholes/test pits of the 100-DR-2 Operable Unit. Sampling and field activities include: Soil screening; geologic sampling; soil sampling (physical property); analytical sampling and depths; and geophysical logging

  12. Start-up and commercial operation of the Laguna Verde power plants, unit 1

    International Nuclear Information System (INIS)

    Torres R, J.F.

    1991-01-01

    The main features of the unit 1 of the Laguna Verde Power Plant is presented as well as the phases of the start-up process. The process includes various steps and tests up to start the commercial operation. (author)

  13. 46 CFR 167.05-25 - Nautical school ship.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Nautical school ship. 167.05-25 Section 167.05-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS PUBLIC NAUTICAL SCHOOL SHIPS Definitions § 167.05-25 Nautical school ship. The term nautical school ship means a vessel operated by or in connection with a nautical school...

  14. Categorization of safety related motor operated valve safety significance for Ulchin Unit 3

    International Nuclear Information System (INIS)

    Kang, D. I.; Kim, K. Y.

    2002-03-01

    We performed a categorization of safety related Motor Operated Valve (MOV) safety significance for Ulchin Unit 3. The safety evaluation of MOV of domestic nuclear power plants affects the generic data used for the quantification of MOV common cause failure ( CCF) events in Ulchin Units 3 PSA. Therefore, in this study, we re-estimated the MGL(Multiple Greek Letter) parameter used for the evaluation of MOV CCF probabilities in Ulchin Units 3 Probabilistic Safety Assessment (PSA) and performed a classification of the MOV safety significance. The re-estimation results of the MGL parameter show that its value is decreased by 30% compared with the current value in Ulchin Unit 3 PSA. The categorization results of MOV safety significance using the changed value of MGL parameter shows that the number of HSSCs(High Safety Significant Components) is decreased by 54.5% compared with those using the current value of it in Ulchin Units 3 PSA

  15. Water level measurements for modeling hydraulic properties in the 300-FF-5 and 100 Aggregate Area Operable units

    International Nuclear Information System (INIS)

    Campbell, M.D.; McMahon, W.J.; Simpson, K.R.

    1993-04-01

    Pressure transducers connected to dataloggers were used to measure ground water and Columbia River water elevations simultaneously and hourly at 35 locations in the 300-FF-5 Operable Unit and 16 locations in the 100 Aggregate Area Operable Unit on the Hanford Site. Water temperatures were also measured at 12 of these locations. This report details the findings of these studies

  16. 40 CFR 60.1690 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 60.1690 Section 60.1690 Protection of Environment... SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Model Rule-Good Combustion Practices: Operating Requirements § 60.1690 What...

  17. Final environmental statement related to the operation of Byron Station, Units 1 and 2 (Docket Nos. STN 50-454 and STN 50-455)

    International Nuclear Information System (INIS)

    1982-04-01

    The proposed action is the issuance of an operating license to Commonwealth Edison Company (CECo) of Chicago, Illinois, for startup and operation of the Byron Station, Units 1 and 2 on a 710-ha (1754-acre) site in Ogle County 6 km (4 miles) south-southwest of Byron, Illinois, and 3 km (2 miles) east of the Rock River. Each of the two generating units consists of a pressurized-water reactor, four steam generators, one steam turbine generator, a heat-dissipation system, and associated auxiliary and engineered safeguards. Information is presented under the following topics: purpose and need for the action; alternatives to the proposed action; project description and affected environment; environmental consequences and mitigating actions; evaluation of the proposed action; list of contributors; list of agencies and organizations requested to comment on the draft environmental statement; and responses to comments on the Draft Environmental Statement

  18. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 543: Liquid Disposal Units is listed in Appendix III of the ''Federal Facility Agreement and Consent Order'' (FFACO) which was agreed to by the state of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (FFACO, 1996). CAU 543 sites are located in Areas 6 and 15 of the Nevada Test Site (NTS), which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven Corrective Action Sites (CASs) (Figure 1): CAS 06-07-01, Decon Pad; CAS 15-01-03, Aboveground Storage Tank; CAS 15-04-01, Septic Tank; CAS 15-05-01, Leachfield; CAS 15-08-01, Liquid Manure Tank; CAS 15-23-01, Underground Radioactive Material Area; and CAS 15-23-03, Contaminated Sump, Piping. All Area 15 CASs are located at the former U.S. Environmental Protection Agency (EPA) Farm, which operated from 1963 to 1981 and was used to support animal experiments involving the uptake of radionuclides. Each of the Area 15 CASs, except CAS 15-23-01, is associated with the disposal of waste effluent from Building 15-06, which was the primary location of the various tests and experiments conducted onsite. Waste effluent disposal from Building 15-06 involved piping, sumps, outfalls, a septic tank with leachfield, underground storage tanks, and an aboveground storage tank (AST). CAS 15-23-01 was associated with decontamination activities of farm equipment potentially contaminated with radiological constituents, pesticides, and herbicides. While the building structures were removed before the investigation took place, all the original tanks, sumps, piping, and concrete building pads remain in place. The Area 6 CAS is located at the Decontamination Facility in Area 6, a facility which operated from 1971 to 2001 and was used to decontaminate vehicles, equipment, clothing, and other materials that had become contaminated during nuclear testing activities. The CAS includes the effluent collection and distribution systems for Buildings

  19. Determining the Residual Lifetime of Qualified Electrical and I and C Equipment in Units 5 and 6 of Kozloduy NPP

    International Nuclear Information System (INIS)

    Radoslavov, Biser

    2012-01-01

    The proposed paper clarifies the environmental qualification and residual lifetime of installed equipment and electrical cables in operating WWER 1000 type units 5 and 6 of Kozloduy NPP. The qualification approach is a combination of analyses and tests in consideration of some specific features of WWER equipment. As a result of the study, selected equipment is divided in 26 groups. Qualification groups include similar types of equipment with equal resistance to foreign impacts, analogous critical parts, and same methods of control and estimation of residual lifetime. Qualification protocols were made for each group. (author)

  20. Cooling unit for a superconducting power cable. Two years successful operation

    Energy Technology Data Exchange (ETDEWEB)

    Herzog, Friedhelm [Messer Group GmbH, Krefeld (Germany); Kutz, Thomas [Messer Industriegase GmbH, Bad Soden (Germany); Stemmle, Mark [Nexans Deutschland GmbH, Hannover (Germany); Kugel, Torsten [Westnetz GmbH, Essen (Germany)

    2016-07-01

    High temperature super conductors (HTS) can efficiently be cooled with liquid nitrogen down to a temperature of 64 K (-209 C). Lower temperatures are not practical, because nitrogen becomes solid at 63 K (-210 C). To achieve this temperature level the coolant has to be vaporized below atmospheric pressure. Messer has developed a cooling unit with an adequate vacuum subcooler, a liquid nitrogen circulation system, and a storage vessel for cooling an HTS power cable. The cooling unit was delivered in 2013 for the German AmpaCity project of RWE Deutschland AG, Nexans and Karlsruhe Institute of Technology. Within this project RWE and Nexans installed the worldwide longest superconducting power cable in the city of Essen, Germany. The cable is in operation since March 10th, 2014.

  1. Development, operating experience and future plan of ABWR in Japan

    International Nuclear Information System (INIS)

    Ujihara, N.

    2001-01-01

    From 1974 to 1978 nuclear power plants' capacity factor decreased to a low level at the Tokyo Electric Power Company (TEPCO) for stress corrosion cracking of stainless steal pipe, thermal fatigue crack of feed water spurger and vibration trouble of LPRM, etc. So, for improving that situation, we gathered the most useful BWR technology in the world at that time and we started the ABWR project to develop an ideal BWR. The goals of this development were: (1) Enhanced safety and reliability; (2) Reduced occupational radiation exposure and radioactive waste; (3) Enhanced operability and maneuverability; and (4) Improved economy. Significant improvements were induced by the adoption of the reactor internal pump, fine motion control rod drive mechanism, integral type reinforced concrete containment vessel and digital control system. After about 10 years R and D, we succeeded in the development of the compact and economic plant, ABWR (1356MW(e)) whose building volume had been reduced to 76%, compared with the previous BWR (1100MW(e)). The construction of Kashiwazaki-Kariwa Nuclear Power Plant unit No. 6, which is the first ABWR plant in the world, was started September 1991, and that of unit No. 7 was started in February 1992. We used effective construction methods, such as large block construction method and all weather construction method, to shorten the construction duration from first concrete to commercial operation start to 51.5 months. The commercial operation start of Kashiwazaki-Kariwa Nuclear Power Plant unit No. 6 was November 1996 and that of unit No. 7 was July 1997. After that, unit No. 6 had three times the annual outage and unit No. 7 had two times the annual outage. Both plants have good operating experiences. From commercial operation start to end of August 2000, the capacity factor of unit No. 6 is 86.4% and that of unit No. 7 is 86.9%. Now, in Taiwan, ABWR plants are under construction at Lungmen unit No. 1 and 2. In Japan, ABWR plants are under

  2. Watershed Boundaries - WATERSHEDS_HUC06_USGS_IN: 6-Digit Accounting Units, Hydrologic Units, in Indiana, (Derived from US Geological Survey, 1:24,000 Polygon Shapefile)

    Data.gov (United States)

    NSGIC State | GIS Inventory — WATERSHEDS_HUC06_USGS_IN is a polygon shapefile showing the boundaries of accounting units (HUA) in Indiana. Accounting units are noted by a 6-digit hydrologic unit....

  3. Kozloduy NPP units 5 and 6 modernization program. Measures implementation in outages

    International Nuclear Information System (INIS)

    Naydenov, N.; Mignone, O.

    2004-01-01

    The units 5 and 6 modernization program is a highly demanding program composed by many plant modifications and studies about plant conditions. The program measures implementation during the units outages represents a challenge by the need to compromise shut down duration with the workload related to measures installation. The units shutdown duration should be kept to the planned duration. In parallel, contractors work has to be organized, planned and performed to allow successful measures completion. In accordance with the contract requirements, contractors prepare installation documents which comprise all activities to be performed during the installation and testing of the measures. The subcontractors complement these installation documents with the project organization and execution documents, which include the manpower skills, qualifications, work orders, and other important installation instructions and information. Contractors prepared detailed installation schedules, and these were integrated by Parsons E and C in the Integrated installation schedule. The integrated schedule proved to be useful to identify possible area usage conflicts and manpower overlapping, with appropriate results for electrical, instrumentation and control work, and for the utilization of the polar crane in the containment building. Contractors installation schedules were updated on a weekly basis, showing variances versus the target, and manpower histograms for the resource loading. Organization of contractors work was supported by KNPP plant outage meetings, in which status and problems were addressed, and solution and/or corrective actions defined for further implementation. KNPP meetings were planned on a daily basis for most relevant or critical measures, or on a weekly basis for less intensive measures. KNPP meetings proved to be an excellent communication tool for keeping the measures under control and monitoring KNPP defined personnel responsible for authorizing changes, in

  4. Nursing Leaders' Satisfaction with Information Systems in the Day-to-Day Operations Management in Hospital Units.

    Science.gov (United States)

    Peltonen, Laura-Maria; Junttila, Kristiina; Salanterä, Sanna

    2018-01-01

    Information usage in the day-to-day operations management of hospital units is complex due to numerous information systems in use. The aim of this study was to describe and compare nurse leaders' satisfaction with information systems used in the day-to-day operations management in hospital units. The design was a cross-sectional survey with five questions rated from one (disagree) to five (fully agree). The response rate was 65 % (n = 453). Respondents reported fair satisfaction with how information systems support decision-making (median 4, IQR 3-4) and improve ease of access to information (median 4, IQR 3-4). However, respondents were less satisfied with how systems improve speed of access to information (median 3, IQR 3-4). Nor did respondents think that systems were developed for them (median 3, IQR 2-4). Respondents further reported needing numerous systems daily to support decision-making (median 4, IQR 3-5). A clear need for one system, which would gather important information for display was stated (median 5, IQR 4-5). Work experience, gender and time when overseeing the unit were associated with some aspects related to satisfaction. In conclusion, information system improvements are needed to better support the day-to-day operations management in hospital units.

  5. Study of the thermal behavior of a latent heat cold storage unit operating under frosting conditions

    International Nuclear Information System (INIS)

    Simard, A.P.; Lacroix, M.

    2003-01-01

    A study is performed of the thermal behavior of a latent heat cold storage unit operating under frosting conditions. This unit is employed to maintain the temperature inside the refrigerated compartment of a truck below 265 K. The system consists of parallel plates filled with a phase change material (PCM) that absorbs heat from the flow of warm moist air. A mathematical model for the system is first presented and, next, validated with numerical and experimental data. It is then exploited to assess the effects of design parameters and operating conditions on the performance of the system. The recommended thickness and distance separating the PCM plates are found to be 50x10 -3 and 30x10 -3 m, respectively. The results indicate that the performance of the unit is enhanced by turbulent air flow in spite of the increased pressure loss and accentuated frost growth. The unit also performs well even when the surrounding relative humidity is 100%

  6. Baseline groundwater model update for p-area groundwater operable unit, NBN

    Energy Technology Data Exchange (ETDEWEB)

    Ross, J. [Savannah River Site (SRS), Aiken, SC (United States); Amidon, M. [Savannah River Site (SRS), Aiken, SC (United States)

    2015-09-01

    This report documents the development of a numerical groundwater flow and transport model of the hydrogeologic system of the P-Area Reactor Groundwater Operable Unit at the Savannah River Site (SRS) (Figure 1-1). The P-Area model provides a tool to aid in understanding the hydrologic and geochemical processes that control the development and migration of the current tritium, tetrachloroethene (PCE), and trichloroethene (TCE) plumes in this region.

  7. Licensed operating reactors. Status summary report, data as of May 31, 1986. Volume 10, Number 6

    International Nuclear Information System (INIS)

    1986-08-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  8. Female Participation in Formed Police Units: A Report on the Integration of Women in Formed Police Units of Peacekeeping Operations

    Science.gov (United States)

    2012-09-01

    of Peacekeeping Operations in accor- dance with the principles of United Nations (UN) Res- olution 1325. To address this topic the study (1) briefly...that the eligibility criteria was revised to include women who played support roles to the combatants, as cooks, por- ters, sex slaves or spies

  9. Qualitative risk assessment for the 100-NR-2 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This qualitative risk assessment provides information about the 100- NR-2 Groundwater Operable Unit of the Hanford reservation. Topics discussed in this report are: data evaluation; human health risk assessment overview; ecological evaluations; summary of uncertainty; results of both the ecological and human health evaluations; toxicity assessment; risk characterization; and a summary of contaminants of potential concern

  10. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Evaluation of severe accident risk during mid-loop operations. Main report. Volume 6. Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Jo, J.; Lin, C.C.; Neymotin, L. [Brookhaven National Lab., Upton, NY (United States)] [and others

    1995-05-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. A phased approach was used in the level-1 program. In phase 1 which was completed in Fall 1991, a coarse screening analysis including internal fire and flood was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The results of the phase 2 level 2/3 study are the subject of this volume of NUREG/CR-6144, Volume 6.

  11. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Evaluation of severe accident risk during mid-loop operations. Main report. Volume 6. Part 1

    International Nuclear Information System (INIS)

    Jo, J.; Lin, C.C.; Neymotin, L.

    1995-05-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. A phased approach was used in the level-1 program. In phase 1 which was completed in Fall 1991, a coarse screening analysis including internal fire and flood was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The results of the phase 2 level 2/3 study are the subject of this volume of NUREG/CR-6144, Volume 6

  12. Turkey Point Plant, Units 3 and 4. Semiannual operating report No. 7, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Unit 3 generated 1,968,074 MWh(e) net electric power and the generator was on line 2,802.9 hrs. Unit 4 generated 2,560,476 MWh(e) and was on line 3,944.8 hrs. Information is presented concerning operations, power generation, shutdowns, maintenance, changes, tests, experiments, radioactive effluent releases, radiological environmental monitoring, and occupational personnel radiation monitoring

  13. The success of 6-hour hospital discharge on patients having vaginal repair operations using a new conscious sedation technique.

    Science.gov (United States)

    Hill, N; Gupta, A; Zakaryan, A; Morey, R

    2011-01-01

    Anterior and posterior repair are standard surgical techniques for treatment of vaginal prolapse. These procedures are performed traditionally under general anaesthetic or spinal anaesthetic and usually require overnight admission in the hospital. We describe our case series of 40 patients who underwent anterior (18/40), posterior (20/40) or combined repair (2/40) under local anaesthetic and conscious sedation (Remifentanyl). The majority (35/40) were performed in the day-case surgery unit and 95% patients were discharged within 6 hours of the operation, with no complications. All the patients were satisfied with the anaesthetic technique. We concluded that our technique of vaginal repair avoids the risk of general and spinal anaesthetic. The majority of operations can be performed as day cases with good patient satisfaction and without increasing risks to the patients. This technique has potential significant financial saving for the hospitals.

  14. 36 CFR 6.6 - Solid waste disposal sites within new additions to the National Park System.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Solid waste disposal sites... NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR SOLID WASTE DISPOSAL SITES IN UNITS OF THE NATIONAL PARK SYSTEM § 6.6 Solid waste disposal sites within new additions to the National Park System. (a) An operator...

  15. Dielectric properties of (K0.5Na0.5)NbO3-(Bi0.5Li0.5)ZrO3 lead-free ceramics as high-temperature ceramic capacitors

    Science.gov (United States)

    Yan, Tianxiang; Han, Feifei; Ren, Shaokai; Ma, Xing; Fang, Liang; Liu, Laijun; Kuang, Xiaojun; Elouadi, Brahim

    2018-04-01

    (1 - x)K0.5Na0.5NbO3- x(Bi0.5Li0.5)ZrO3 (labeled as (1 - x)KNN- xBLZ) lead-free ceramics were fabricated by a solid-state reaction method. A research was conducted on the effects of BLZ content on structure, dielectric properties and relaxation behavior of KNN ceramics. By combining the X-ray diffraction patterns with the temperature dependence of dielectric properties, an orthorhombic-tetragonal phase coexistence was identified for x = 0.03, a tetragonal phase was determined for x = 0.05, and a single rhombohedral structure occurred at x = 0.08. The 0.92KNN-0.08BLZ ceramic exhibits a high and stable permittivity ( 1317, ± 15% variation) from 55 to 445 °C and low dielectric loss (≤ 6%) from 120 to 400 °C, which is hugely attractive for high-temperature capacitors. Activation energies of both high-temperature dielectric relaxation and dc conductivity first increase and then decline with the increase of BLZ, which might be attributed to the lattice distortion and concentration of oxygen vacancies.

  16. Unusual occurrences during the whole operation of BN-250 NPP

    International Nuclear Information System (INIS)

    Andropenkov, S.

    2000-01-01

    Unusual occurrences during the whole operation BN-350 NPP. 1. Oil ingress in high pressure receiver for the not reveled reason, 12.05.1994. 2. lncrease of water radioactivity of circulating water supply system due to heat exchanger leak of spent fuel assembly washing out system, 17.09.1993. 3. Lack of passableness of sodium drain header of primary circuit reveled during inspection on scheduled preventative maintenance, 28.11.1996. 4. Destruction of the blow-off line of MCP-6 due to corrosion damage of the pipeline while unit was being operated at rated power, 23.04.1993. 5. Lack of passableness of blow-down pipeline connecting reactor gas cover with gas-type pressurizer while unit was being operated at rated power, 17.11.1994. 6. Sodium ingress in blow-down pipeline of loop-5 intermediate heat exchanger while loop-5 was being fed of sodium during scheduled preventative maintenance, 27.06.1994. 7. Resistance deterioration of electro heating zones of loop-4 due to heat exchanger leak and water ingress in air-pipeline of primary circuit boxes recirculating air system, 02.05.1997. 8. Resistance deterioration of electro heating zones of sodium drain header of secondary circuit was sopped in the water for the extinguishing the fire of blowing ventilation oil-strainer, 23.12.1994. 9. Sodium ingress in gas-type pressurizer through pipeline of primary sodium cleanup system and blow-down pipeline of failed MCP-2 while primary sodium cleanup system was being connected to the primary circuit, 17.08.1976. As a rule, the main reactor systems are scrutinized more carefully than the auxiliary reactor systems and the order actions are existed for eliminating and mitigating of consequences of main reactor system fails. Therefore the auxiliary reactor system fails may impact on the main reactor systems through places of its contact in significant measure. The influence of auxiliary reactor system fails on main reactor systems and its possible consequences for behavior of the main

  17. Stable Ferroelectric Behavior of Nb-Modified Bi0.5K0.5TiO3-Bi(Mg0.5Ti0.5)O3 Lead-Free Relaxor Ferroelectric Ceramics

    Science.gov (United States)

    Zaman, Arif; Malik, Rizwan Ahmed; Maqbool, Adnan; Hussain, Ali; Ahmed, Tanveer; Song, Tae Kwon; Kim, Won-Jeong; Kim, Myong-Ho

    2018-03-01

    Crystal structure, dielectric, ferroelectric, piezoelectric, and electric field-induced strain properties of lead-free Nb-modified 0.96Bi0.5K0.5TiO3-0.04Bi(Mg0.5Ti0.5)O3 (BKT-BMT) piezoelectric ceramics were investigated. Crystal structure analysis showed a gradual phase transition from tetragonal to pseudocubic phase with increasing Nb content. The optimal piezoelectric property of small-signal d 33 was enhanced up to ˜ 68 pC/N with a lower coercive field ( E c) of ˜ 22 kV/cm and an improved remnant polarization ( P r) of ˜ 13 μC/cm2 for x = 0.020. A relaxor-like behavior with a frequency-dependent Curie temperature T m was observed, and a high T m around 320°C was obtained in the investigated system. This study suggests that the ferroelectric properties of BKT-BMT was significantly improved by means of Nb substitution. The possible shift of depolarization temperature T d toward high temperature T m may have triggered the spontaneous relaxor to ferroelectric phase transition with long-range ferroelectric order without any traces of a nonergodic relaxor state in contradiction with Bi0.5Na0.5TiO3-based systems. The possible enhancement in ferroelectric and piezoelectric properties near the critical composition x = 0.020 may be attributed to the increased anharmonicity of lattice vibrations which may facilitate the observed phase transition from a low-symmetry tetragonal to a high-symmetry cubic phase with a decrease in the lattice anisotropy of an undoped sample. This highly flexible (at a unit cell level) narrow compositional range triggers the enhancement of d 33 and P r values.

  18. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 17

    International Nuclear Information System (INIS)

    Tam, P.S.

    1995-10-01

    This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), 1991), Supplement No. 8 (January 1992), Supplement No. 9 (June 1992), Supplement No. 10 (October 1992), Supplement No. 11 (April.1993), Supplement No. 12 (October 1993), Supplement No. 13 (April 1994), Supplement No. 14 (December 1994), Supplement No. 15 (June 1995), and Supplement No. 16 (September 1995) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50--390 and 50--391). The facility is located in Rhea county, Tennessee, near the Watts Bar Dam on the Tennessee River. In this supplement, NRC examines the significant problems of construction quality and quality assurance effectiveness that led TVA to withdraw its certification in 1985 that Watts Bar Unit I was ready to load fuel. Also discussed are the extensive corrective actions performed by TVA according to its nuclear performance plans and other supplemental programs, and NRC's extensive oversight to determine whether the Watts Bar Unit 1 construction quality and TVA's operational readiness and quality assurance effectiveness are adequate for a low-power operating license to be issued. SSER 17 does not address Watts Bar Unit 2, except for the systems which are necessary to support Unit 1 operation

  19. Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the

  20. Dresden Nuclear Power Station, Units 1, 2, and 3. Semiannual report on operating and maintenance, July--December 1974

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 388,882 MWH(e) and was on line 3111.2 hours, Unit 2 generated 1,204,106 MWH(e) and was on line 2013.4 hours, and Unit 3 generated 2,250,810 MWH(e) and was on line 3836 hours. Information is presented concerning operations, shutdowns, maintenance, changes, tests, and experiments for the three units. (U.S.)

  1. 14 CFR 91.709 - Operations to Cuba.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Operations to Cuba. 91.709 Section 91.709... Board Such Aircraft § 91.709 Operations to Cuba. No person may operate a civil aircraft from the United States to Cuba unless— (a) Departure is from an international airport of entry designated in § 6.13 of...

  2. Accelerating Malware Detection via a Graphics Processing Unit

    Science.gov (United States)

    2010-09-01

    Processing Unit . . . . . . . . . . . . . . . . . . 4 PE Portable Executable . . . . . . . . . . . . . . . . . . . . . 4 COFF Common Object File Format...operating systems for the future [Szo05]. The PE format is an updated version of the common object file format ( COFF ) [Mic06]. Microsoft released a new...NAs02]. These alerts can be costly in terms of time and resources for individuals and organizations to investigate each misidentified file [YWL07] [Vak10

  3. Operation of the radioactive acid digestion test unit

    International Nuclear Information System (INIS)

    Blasewitz, A.G.; Allen, C.R.; Lerch, R.E.; Ely, P.C.; Richardson, G.L.

    1980-01-01

    The Radioactive Acid Digestion Test Unit (RADTU) has been constructed at Hanford to demonstrate the application of the Acid Digestion Process for treating combustible transuranic wastes and scrap materials. The RADTU with its original tray digestion vessel has recently completed a six-month campaign processing potentially contaminated nonglovebox wastes from a Hanford plutonium facility. During this campaign, it processed 2100 kg of largely cellulosic wastes at an average sustained processing rate of 3 kg/h as limited by the water boiloff rate from the acid feeds. The on-line operating efficiency was nearly 50% on a twelve hour/day, five day/week basis. Following this campaign, a new annular high rate digester has been installed for testing. In preliminary tests with simulated wastes, the new digester demonstrated a sustained capacity of 10 kg/h with greatly improved intimacy of contact between the digestion acid and the waste. The new design also doubles the heat transfer surface, which with reduced heat loss area, is expected to provide at least three times the water boiloff rate of the previous tray digester design. Following shakedown testing with simulated and low-level wastes, the new unit will be used to process combustible plutonium scrap and waste from Hanford plutonium facilities for the purposes of volume reduction, plutonium recovery, and stabilization of the final waste form

  4. Engineering evaluation/conceptual plan for the 200-UP-1 Groundwater Operable Unit interim remedial measure. Revision 2

    International Nuclear Information System (INIS)

    1996-03-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (IRM) to address a uranium and technetium-99 groundwater plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need for an IRM and its potentially achievable objectives and goals. The report also evaluates alternatives to contain elevated concentrations of uranium and technetium-99 and to obtain information necessary to develop final remedial actions for the operable unit

  5. Creation and annihilation operators for SU(3) in an SO(6,2) model

    International Nuclear Information System (INIS)

    Bracken, A.J.; MacGibbon, J.H.

    1984-01-01

    Creation and annihilation operators are defined which are Wigner operators (tensor shift operators) for SU(3). While the annihilation operators are simply boson operators, the creation operators are cubic polynomials in boson operators. Together they generate under commutation the Lie algebra of SO(6,2). A model for SU(3) is defined. The different SU(3) irreducible representations appear explicitly as manifestly covariant, irreducible tensors, whose orthogonality and normalisation properties are examined. Other Wigner operators for SU(3) can be constructed simply as products of the new creation and annihilation operators, or sums of such products. (author)

  6. An ultrasonic therapeutic transducers using lead-free Na0.5K0.5NbO3-CuNb2O6 ceramics

    International Nuclear Information System (INIS)

    Yang, Ming-Ru; Chu, Sheng-Yuan; Tsai, Cheng-Che

    2010-01-01

    Research highlights: → In this paper, CN was added to NKN ceramics to decrease the sintering temperature and to improve the density and piezoelectric characteristics. The influence of CuNb 2 O 6 (CN) content on the microstructure, electrical properties, temperature stability, and mechanical properties of the synthesized samples was investigated. Results show that the samples synthesized with CN-doped not only improved the density but also exhibited superior piezoelectric characteristic, temperature stability of resonance frequency (TCF), and elastic stiffness coefficient than those of pure NKN piezoelectric ceramics. → The bulk density (4.47 g/cm 3 ), k p (40%), k t (45%), Q m (1642), C 33 D (19.64 x 10 10 N/m 2 ), TCF (-0.011%/ o C) and TCC (0.135%/ o C) values for NKN-01CN ceramics obtained from experiments show excellent 'hard' piezoelectric properties. Furthermore, a lead-free NKN-01CN ultrasonic therapeutic transducer was successfully driven by a self-tuning circuit. - Abstract: In this work, we reports on the CuNb 2 O 6 (CN) modified lead-free Na 0.5 K 0.5 NbO 3 (NKN) based piezoelectric ceramics were synthesized by solid-state reaction methods and sintered at 1075 o C for 3 h. A secondary phase of K 4 CuNb 8 O 23 was found in the XRD pattern of NKN-based ceramics as the CN dopants is 1 mol%. Microstructural analyses of un-doped and CN-doped ceramics were performed in a scanning electron microscope. The influence of CN content on the microstructure, electrical properties, temperature stability, and mechanical properties of the synthesized ceramics was investigated. The results show that the synthesized ceramics with CN-doped not only had improved density but also exhibited superior piezoelectric characteristics, temperature stability of resonance frequency (TCF), and a better elastic stiffness coefficient than those of pure NKN piezoelectric ceramics. The bulk density (4.47 g/cm 3 ), k p (40%), k t (45%), Q m (1642), C 33 D (19.64 x 10 10 N/m 2 ), TCF (-0

  7. Hydrologic resources management program and underground test area operable unit fy 1997

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D. F., LLNL

    1998-05-01

    This report present the results of FY 1997 technical studies conducted by the Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area Operable Unit (UGTA). The HRMP is sponsored by the US Department of Energy to assess the environmental (radiochemical and hydrologic) consequences of underground nuclear weapons testing at the Nevada Test Site.

  8. Development of a processor embedded timing unit for the synchronized operation in KSTAR

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Woongryol, E-mail: wrlee@nfri.re.kr; Lee, Taegu; Hong, Jaesic

    2016-11-15

    Highlights: • Timing board for the synchronized tokamak operation. • Processor embedded distributed control system. • Single clock source and multiple trigger signal for the plasma diagnostics. • Delay compensation among the distributed timing boards. - Abstract: The Local Timing Unit (LTU) in KSTAR provides a single clock source and multiple trigger signals with flexible configuration. Over the past seven years, the LTU had a mechanical redesign and several firmware updates for the purpose of provision of a robust operation and precision timing signal. Now we have developed a third version of a local timing unit which has a standalone operation capability. The LTU is built in a cabinet mountable 1U PIZZA box and provides twelve signal output ports, a packet mirroring interface, and an LCD interface panel. The core functions of the LTU are implemented in a Field Programmable Gate Array (FPGA) which has an internal hardcore processor. The internal processor allows the use of Linux Operating System (OS) and the Experimental Physics and Industrial Control System (EPICS). All user level application functions are controllable through the EPICS, however the time critical internal functions are performed by the FPGA logic blocks same as the previous version. The new LTU provides pluggable output module so that we can easily extend the signal output port. The easy installation and effective replacement reduce the efforts of maintenance. This paper describes design, development, and commissioning results of the new KSTAR LTU.

  9. Development of a processor embedded timing unit for the synchronized operation in KSTAR

    International Nuclear Information System (INIS)

    Lee, Woongryol; Lee, Taegu; Hong, Jaesic

    2016-01-01

    Highlights: • Timing board for the synchronized tokamak operation. • Processor embedded distributed control system. • Single clock source and multiple trigger signal for the plasma diagnostics. • Delay compensation among the distributed timing boards. - Abstract: The Local Timing Unit (LTU) in KSTAR provides a single clock source and multiple trigger signals with flexible configuration. Over the past seven years, the LTU had a mechanical redesign and several firmware updates for the purpose of provision of a robust operation and precision timing signal. Now we have developed a third version of a local timing unit which has a standalone operation capability. The LTU is built in a cabinet mountable 1U PIZZA box and provides twelve signal output ports, a packet mirroring interface, and an LCD interface panel. The core functions of the LTU are implemented in a Field Programmable Gate Array (FPGA) which has an internal hardcore processor. The internal processor allows the use of Linux Operating System (OS) and the Experimental Physics and Industrial Control System (EPICS). All user level application functions are controllable through the EPICS, however the time critical internal functions are performed by the FPGA logic blocks same as the previous version. The new LTU provides pluggable output module so that we can easily extend the signal output port. The easy installation and effective replacement reduce the efforts of maintenance. This paper describes design, development, and commissioning results of the new KSTAR LTU.

  10. Effects of transfer from the operating room to the intensive care unit after cardiac surgery on hemodynamics and blood gases

    International Nuclear Information System (INIS)

    Celik, S.; Gurkan, S.; Ustabasi, Z.; Atilgan, Y.; Sari, A.

    2008-01-01

    Objective was to evaluate the effect of transferring open-heart surgery patients from the operating room to the intensive care unit on hemodynamic parameters and blood gases. The study was conducted as a prospective, observational study at the German Hospital, Istanbul, Turkey in 2007. Hemodynamic, blood gas values and oxygen saturation measured by pulse oximetry SpO2 values were recorded in 37 patients who undergone open-heart surgery. Data were evaluated by descriptive statistical methods, Friedman's test and correlation analysis. Thirty-seven patients were included in this study. The low systolic and diastolic arterial blood pressure values prior to transfer, while patients were still under the effect of anesthesia, increased during the transfer and to one and 30 minutes after completion of transfer and return to normal values p<0.05. The SpO2 value measured at 30 minutes after completion of transfer was higher than the first value p<0.05. The pH p<0.001 and arterial partial pressure of oxygen p<0.001 values at the beginning of the transfer had significantly increased at the end of transfer and arterial partial pressure of carbon dioxide values had significantly decreased p<0.001. The transfer of open-heart surgery patients was observed to safe. (author)

  11. Selection of Forklift Unit for Warehouse Operation by Applying Multi-Criteria Analysis

    Directory of Open Access Journals (Sweden)

    Predrag Atanasković

    2013-07-01

    Full Text Available This paper presents research related to the choice of the criteria that can be used to perform an optimal selection of the forklift unit for warehouse operation. The analysis has been done with the aim of exploring the requirements and defining relevant criteria that are important when investment decision is made for forklift procurement, and based on the conducted research by applying multi-criteria analysis, to determine the appropriate parameters and their relative weights that form the input data and database for selection of the optimal handling unit. This paper presents an example of choosing the optimal forklift based on the selected criteria for the purpose of making the relevant investment decision.

  12. Conceptual site models for groundwater contamination at 100-BC-5, 100-KR-4, 100-HR-3, and 100-FR-3 operable units

    International Nuclear Information System (INIS)

    Peterson, R.E.; Raidl, R.F.; Denslow, C.W.

    1996-09-01

    This document presents technical information on groundwater contamination in the 100-BC-5, 100-KR-4, 100-HR-3, and 100-FR-3 Operable Units on the Hanford Site in Richland, Washington. These operable units are defined for groundwater that underlies the retired plutonium production reactors and their associated support facilities. This technical information supports conceptual site models (CSM) for each operable unit. The goal in maintaining a CSM is to ensure that a reasonable understanding of contamination issues in each groundwater operable unit is available for selecting a final remediation alternative and for developing a record of decision. CSMs are developed for hazardous waste sites to help evaluate potential risks to human health and the environment from exposure to contamination

  13. Streamlined approach for environmental restoration closure report for Corrective Action Unit 120: Areas 5 and 6 aboveground storage tanks, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    This Closure Report provides documentation for the closure of Corrective Action Unit (CAU) 120 of the Federal Facilities Agreement and Consent Order (FFACO). CAU 120 consists of two Corrective Action Sites (CASs) located in Areas 5 and 6 of the Nevada Test Site (NTS), which are approximately 130 kilometers (80 miles) northwest of Las Vegas, Nevada. CAS 05-01-01 is located in Area 5 and consists of three 45,800-liter (12,100-gallon) aboveground storage tanks (ASTs), piping, and debris associated with Well RNM-1. CAS 06-01-01 consists of two ASTs and two tanker trailers (all portable) that were originally located at the Area 6 Cp-50 Hot Park and which had been moved to the Area 6 Waste Handling Facility. All of the items in CAU 120 have been used to contain or convey radiologically contaminated fluid that was generated during post-nuclear event activities at the NTS.

  14. Streamlined approach for environmental restoration closure report for Corrective Action Unit 120: Areas 5 and 6 aboveground storage tanks Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1999-06-01

    This Closure Report provides documentation for the closure of Corrective Action Unit (CAU) 120 of the Federal Facilities Agreement and Consent Order (FFACO). CAU 120 consists of two Corrective Action Sites (CASs) located in Areas 5 and 6 of the Nevada Test Site (NTS), which are approximately 130 kilometers (80 miles) northwest of Las Vegas, Nevada. CAS 05-01-01 is located in Area 5 and consists of three 45,800-liter (12,100-gallon) aboveground storage tanks (ASTs), piping, and debris associated with Well RNM-1. CAS 06-01-01 consists of two ASTs and two tanker trailers (all portable) that were originally located at the Area 6 Cp-50 Hot Park and which had been moved to the Area 6 Waste Handling Facility. All of the items in CAU 120 have been used to contain or convey radiologically contaminated fluid that was generated during post-nuclear event activities at the NTS

  15. Structural and electrical properties of La{sub 0.5}Ca{sub 0.5}Mn{sub 0.95}Fe{sub 0.05}O{sub 3+{delta}} perovskite

    Energy Technology Data Exchange (ETDEWEB)

    Mohamed, E.A., E-mail: emanattamohammed@yahoo.com [Department of Physics, Faculty of Science (Girl' s Branch), Al Azhar University, Nasr City, Cairo (Egypt)

    2012-12-05

    Highlights: Black-Right-Pointing-Pointer La{sub 0.5}Ca{sub 0.5}Mn{sub 0.95}Fe{sub 0.05}O{sub 3+{delta}} synthesis has been achieved by co-precipitation process. Black-Right-Pointing-Pointer Moessbauer results show an evidence for the local distortion of Mn(Fe)O{sub 6} octahedron. Black-Right-Pointing-Pointer Metal-Semiconductor transition temperature (T{sub p}) is observed. - Abstract: La{sub 0.5}Ca{sub 0.5}Mn{sub 0.95}Fe{sub 0.05}O{sub 3+{delta}} was synthesized by co-precipitation method. The structure refinement by using the Rietveld method indicates that the sample was single phase with the presence of small impurities (Mn{sub 3}O{sub 4}) and crystallizes in an orthorhombic (Pbmn) structure. The room temperature (RT) Moessbauer spectrum shows clear evidence of the local structural distortion of the Mn(Fe)O{sub 6} octahedron on the basis of non-zero nuclear quadrupole interactions for high-spin Fe{sup 3+} ions. The Jahn-Teller coupling strength (E{sub JT}) was estimated from the Moessbauer results. Metal-Semiconductor transition temperature (T{sub p}) is observed at 80 K. At high temperature (T{sub P} < T < {theta}{sub D}/2) conductivity data satisfy the variable range hopping (VRH) model. For T > {theta}{sub D}/2 the small polaron hopping model is more appropriate than the VRH model.

  16. 48 CFR 970.3102-05-4 - Bonding costs.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Bonding costs. 970.3102-05... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contract Cost Principles and Procedures 970.3102-05-4 Bonding costs. (d) The allowability of bonding costs shall be determined pursuant to 970.5228...

  17. Engine Tune-up Service. Unit 6: Emission Control Systems. Student Guide. Automotive Mechanics Curriculum.

    Science.gov (United States)

    Bacon, E. Miles

    This student guide is for Unit 6, Emission Control Systems, in the Engine Tune-Up Service portion of the Automotive Mechanics Curriculum. It deals with inspecting, testing, and servicing an emission control system. A companion review exercise book and posttests are available separately as CE 031 221-222. An introduction tells how this unit fits…

  18. Donald C. Cook Nuclear Power Plant, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit was paralleled to the grid 83.1 percent of the time and 7,073,200 MWH gross was generated. There were six scheduled outages and 14 forced outages/load reductions. Information is presented concerning operations, shutdowns, power reductions, inservice maintenance, personnel radiation exposures, fuel history, and facility changes

  19. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measures for addressing contaminated soil at the 100-HR-1 Operable Unit, located at the Hanford Site. In addition, this plan includes a summary of other alternatives analyzed and considered for the 100-HR-1 Operable Unit. The EPA, DOE, and Washington State Dept. of Ecology believe that a combination of removal, treatment, and disposal technologies, where appropriate, would significantly reduce the potential threats to human health and the environment at the 100-HR-1 Operable Unit high-priority waste sites. The remedial actions described in this proposed plan are designed to minimize human health and ecological risks and ensure that additional contaminants originating from these waste sites are not transported to the groundwater. The 100-HR-1 Operable Unit contains the retention basin for the H reactor cooling system, process effluent trenches, the Pluto crib which received an estimated 260 gallons of radioactive liquid waste, process effluent pipelines, and solid waste sites used for the burial of decontaminated and decommissioned equipment from other facilities. Potential health threats would be from the isotopes of cesium, cobalt, europium, plutonium, and strontium, and from chromium, arsenic, lead, and chysene

  20. Electrical properties and x-ray photoelectron spectroscopy studies of Bi(Zn0.5Ti0.5)O3 doped Pb(Zr0.4Ti0.6)O3 thin films

    Science.gov (United States)

    Tang, M. H.; Zhang, J.; Xu, X. L.; Funakubo, H.; Sugiyama, Y.; Ishiwara, H.; Li, J.

    2010-10-01

    (1-x)Pb(Zr0.4,Ti0.6)O3-(x)Bi(Zn0.5,Ti0.5)O3 (PZT-BZT) (x =0, 0.03, 0.05, 0.08, and 0.1) films were deposited on Pt(111)/Ti/SiO2/Si(100) substrates by chemical solution deposition using spin-coating. All samples showed highly (111) oriented perovskite phase and no other phase was observed. The ferroelectric properties of PZT-BZT films were systematically investigated as a function of the content x of the BZT solution. It is found that BZT doping in PZT films could greatly enhance the remnant polarization (Pr), as well as improve the fatigue property. In a 3 wt % BZT-doped PZT film, the 2Pr and the coercive field (Ec) are 90 μC/cm2 and 95 kV/cm at 10 kHz, respectively, at an electric field of 500 kV/cm, and the leakage current density is less than 1×10-7 A/cm2. The impact of BZT doping on the structure of PZT has been investigated by x-ray photoelectron spectroscopy.

  1. Development of in situ product removal strategies in biocatalysis applying scaled-down unit operations.

    Science.gov (United States)

    Heintz, Søren; Börner, Tim; Ringborg, Rolf H; Rehn, Gustav; Grey, Carl; Nordblad, Mathias; Krühne, Ulrich; Gernaey, Krist V; Adlercreutz, Patrick; Woodley, John M

    2017-03-01

    An experimental platform based on scaled-down unit operations combined in a plug-and-play manner enables easy and highly flexible testing of advanced biocatalytic process options such as in situ product removal (ISPR) process strategies. In such a platform, it is possible to compartmentalize different process steps while operating it as a combined system, giving the possibility to test and characterize the performance of novel process concepts and biocatalysts with minimal influence of inhibitory products. Here the capabilities of performing process development by applying scaled-down unit operations are highlighted through a case study investigating the asymmetric synthesis of 1-methyl-3-phenylpropylamine (MPPA) using ω-transaminase, an enzyme in the sub-family of amino transferases (ATAs). An on-line HPLC system was applied to avoid manual sample handling and to semi-automatically characterize ω-transaminases in a scaled-down packed-bed reactor (PBR) module, showing MPPA as a strong inhibitor. To overcome the inhibition, a two-step liquid-liquid extraction (LLE) ISPR concept was tested using scaled-down unit operations combined in a plug-and-play manner. Through the tested ISPR concept, it was possible to continuously feed the main substrate benzylacetone (BA) and extract the main product MPPA throughout the reaction, thereby overcoming the challenges of low substrate solubility and product inhibition. The tested ISPR concept achieved a product concentration of 26.5 g MPPA  · L -1 , a purity up to 70% g MPPA  · g tot -1 and a recovery in the range of 80% mol · mol -1 of MPPA in 20 h, with the possibility to increase the concentration, purity, and recovery further. Biotechnol. Bioeng. 2017;114: 600-609. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  2. On the operation of a cryostat for Ge(Li) detector

    International Nuclear Information System (INIS)

    Donde, A.L.; L'vov, A.N.

    1974-01-01

    Operating experience with cryostats for Ge(Li) detectors developed at the FTI of the Academy of Science of the Ukrainian SSR, and used in several laboratories for 5 years is reported. It is shown that the spectrometric properties of all cryostat-mounted detectors operating since 1969 have not been affected and up to now the detectors are operating successfully. Nitrogen consumption has not increased and is at a level of 0.5 l/d. During five-year continuous operation the cryostat pressure has varied from 6.10 -7 to 8.10 -6 torr

  3. Reliability of operating WWER monitoring systems

    International Nuclear Information System (INIS)

    Yastrebenetsky, M.A.; Goldrin, V.M.; Garagulya, A.V.

    1996-01-01

    The elaboration of WWER monitoring systems reliability measures is described in this paper. The evaluation is based on the statistical data about failures what have collected at the Ukrainian operating nuclear power plants (NPP). The main attention is devoted to radiation safety monitoring system and unit information computer system, what collects information from different sensors and system of the unit. Reliability measures were used for decision the problems, connected with life extension of the instruments, and for other purposes. (author). 6 refs, 6 figs

  4. Reliability of operating WWER monitoring systems

    Energy Technology Data Exchange (ETDEWEB)

    Yastrebenetsky, M A; Goldrin, V M; Garagulya, A V [Ukrainian State Scientific Technical Center of Nuclear and Radiation Safety, Kharkov (Ukraine). Instrumentation and Control Systems Dept.

    1997-12-31

    The elaboration of WWER monitoring systems reliability measures is described in this paper. The evaluation is based on the statistical data about failures what have collected at the Ukrainian operating nuclear power plants (NPP). The main attention is devoted to radiation safety monitoring system and unit information computer system, what collects information from different sensors and system of the unit. Reliability measures were used for decision the problems, connected with life extension of the instruments, and for other purposes. (author). 6 refs, 6 figs.

  5. Safety evaluation report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1988-01-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and the City of Dalton, Georgia, for licenses to operate Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). The facility is located in Burke County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia, and on the Savannah River. This seventh supplement to NUREG-1137 provides recent information regarding resolution of some of the open and confirmatory items that remained unresolved following issuance of Supplement 6, and documents completion of several Unit 1 license conditions

  6. Synthesis and characterization of superionic (LiBr)_0_._5(AlSiO)_0_._5

    International Nuclear Information System (INIS)

    Aziz K Jahja; Safei Purnama

    2010-01-01

    Materials of LiBr silicate aluminum ionic conductor have been prepared by powder metallurgy method in which 0.5 mole of LiBr powder is mixed with about 0.5 mole silicate aluminum in liquid medium of aquadest. After mixing and homogenization, the samples are dried, compacted and heated at 600 °C for 1 hour. Characterization of materials structure was carried out by X-Ray diffraction, ionic conductivity was measured by LCR meter with frequency range of 10"-"1 to 10"5 Hz at room temperature. Results of measurement show the (LiBr)_0_._5(AlSiO)_0_._5 conductor has the structure of both LiBr and of silicate aluminum. (LiBr)_0_._5(AlSiO)_0_._5 has the highest ionic conductivity in the order of 10"-"3 S.cm"-"1 while the ionic conductivity of LiBr is found to be about 10"-"4 S.cm"-"1 and that of silicate aluminum is about 10"-"6 S.cm"-"1, all measured at room temperature. (author)

  7. Data compilation task report for the source investigation of the 300-FF-1 operable unit phase 1 remedial investigation

    International Nuclear Information System (INIS)

    Young, J.S.; Fruland, R.M.; Fruchter, J.S.

    1990-02-01

    This report provides additional information on facility and waste characteristics for the 300-FF-1 operable unit. The additional information gathered and reported includes meetings and on-site visits with current and past personnel having knowledge of operations in the operable unit, a more precise determination of the location of the Process Sewer lines and Retired Radioactive Liquid Waste Sewer, a better understanding of the phosphoric acid spill at the 340 Complex, and a search for engineering plans and environmental reports related to the operable unit. As a result of this data-gathering effort, recommendations for further investigation include characterization of the 307 Trenches to determine the origin of an underlying uranium plume in the groundwater, more extensive sampling of near-surface and dike sediments in the North and South Process Ponds to better define the extent of horizontal contamination, and detection of possible leaks in the abandoned Radioactive Waste Sewer by either electromagnetic induction or remote television camera inspection techniques. 16 refs., 4 figs., 5 tabs

  8. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 2,587,248 MWH(e) with the reactor on line 6,242.4 hr. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, and reportable occurrences

  9. Superfund record of decision (EPA Region 4): Marzone Inc. /Chevron Chemical Company Superfund Site, Operable Unit 1, Tifton, GA, September 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-30

    This decision document (Record of Decision) presents the selected remedial action for the Marzone, Inc./Chevron Chemical Company Site in Tift County, Georgia. EPA has organized the work at this Site into two phases or operable units (OUs). Operable Unit No. 1 involves contamination on the 1.68-acre former Marzone pesticide blending area, part of the Slack Property, and railroad drainage ditch past the southwest corner of the horse pasture, and contaminated groundwater related to the Site. This first operable unit is broken down into two separate remedies; one for groundwater and the other for soil.

  10. Pilot-scale treatability test plan for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump-and-treat testing at the 100-HR-3 Operable Unit. The test will be conducted in fulfillment of interim Milestone M-15-06E to begin pilot-scale pump-and-treat operations by August 1994. The scope of the test was determined based on the results of lab/bench-scale tests (WHC 1993a) conducted in fulfillment of Milestone M-15-06B. These milestones were established per agreement between the U.S. Department of Energy (DOE), the Washington State Department of Ecology and the U.S. Environmental Protection Agency (EPA), and documented on Hanford Federal of Ecology Facility Agreement and Consent Order Change Control Form M-15-93-02. This test plan discusses a pilot-scale pump-and-treat test for the chromium plume associated with the D Reactor portion of the 100-HR-3 Operable Unit. Data will be collected during the pilot test to assess the effectiveness, operating parameters, and resource needs of the ion exchange (IX) pump-and-treat system. The test will provide information to assess the ability to remove contaminants by extracting groundwater from wells and treating extracted groundwater using IX. Bench-scale tests were conducted previously in which chromium VI was identified as the primary contaminant of concern in the 100-D reactor plume. The DOWEX 21K trademark resin was recommended for pilot-scale testing of an IX pump-and-treat system. The bench-scale test demonstrated that the system could remove chromium VI from groundwater to concentrations less than 50 ppb. The test also identified process parameters to monitor during pilot-scale testing. Water will be re-injected into the plume using wells outside the zone of influence and upgradient of the extraction well

  11. The Vertebrate Brain, Evidence of Its Modular Organization and Operating System: Insights into the Brain's Basic Units of Structure, Function, and Operation and How They Influence Neuronal Signaling and Behavior

    Science.gov (United States)

    Baslow, Morris H.

    2011-01-01

    The human brain is a complex organ made up of neurons and several other cell types, and whose role is processing information for use in eliciting behaviors. However, the composition of its repeating cellular units for both structure and function are unresolved. Based on recent descriptions of the brain's physiological “operating system”, a function of the tri-cellular metabolism of N-acetylaspartate (NAA) and N-acetylaspartylglutamate (NAAG) for supply of energy, and on the nature of “neuronal words and languages” for intercellular communication, insights into the brain's modular structural and functional units have been gained. In this article, it is proposed that the basic structural unit in brain is defined by its physiological operating system, and that it consists of a single neuron, and one or more astrocytes, oligodendrocytes, and vascular system endothelial cells. It is also proposed that the basic functional unit in the brain is defined by how neurons communicate, and consists of two neurons and their interconnecting dendritic–synaptic–dendritic field. Since a functional unit is composed of two neurons, it requires two structural units to form a functional unit. Thus, the brain can be envisioned as being made up of the three-dimensional stacking and intertwining of myriad structural units which results not only in its gross structure, but also in producing a uniform distribution of binary functional units. Since the physiological NAA–NAAG operating system for supply of energy is repeated in every structural unit, it is positioned to control global brain function. PMID:21720525

  12. The Vertebrate Brain, Evidence of Its Modular Organization and Operating System: Insights into the Brain's Basic Units of Structure, Function, and Operation and How They Influence Neuronal Signaling and Behavior.

    Science.gov (United States)

    Baslow, Morris H

    2011-01-01

    The human brain is a complex organ made up of neurons and several other cell types, and whose role is processing information for use in eliciting behaviors. However, the composition of its repeating cellular units for both structure and function are unresolved. Based on recent descriptions of the brain's physiological "operating system", a function of the tri-cellular metabolism of N-acetylaspartate (NAA) and N-acetylaspartylglutamate (NAAG) for supply of energy, and on the nature of "neuronal words and languages" for intercellular communication, insights into the brain's modular structural and functional units have been gained. In this article, it is proposed that the basic structural unit in brain is defined by its physiological operating system, and that it consists of a single neuron, and one or more astrocytes, oligodendrocytes, and vascular system endothelial cells. It is also proposed that the basic functional unit in the brain is defined by how neurons communicate, and consists of two neurons and their interconnecting dendritic-synaptic-dendritic field. Since a functional unit is composed of two neurons, it requires two structural units to form a functional unit. Thus, the brain can be envisioned as being made up of the three-dimensional stacking and intertwining of myriad structural units which results not only in its gross structure, but also in producing a uniform distribution of binary functional units. Since the physiological NAA-NAAG operating system for supply of energy is repeated in every structural unit, it is positioned to control global brain function.

  13. Visual Problems in Night Operations (Problemes de Vision dans les Operations de Nuit)

    Science.gov (United States)

    1992-05-01

    conference proceedings (FR) Progrqbs r~cents concernant l05 aides au pilote clans I habitacle d’un aaroi’ef milltaire en operations. Nouveau drone ...allleurs) traitelit doe la sophistication des La firme isra~lienne tAt teste un nouveau drone appel6 ’Impact’. tacnes domanda~es aus pilotes d-avionS- doe...une camara do tala6vision A vision nocturne. 151 met aussl relations liomlme-macfline.ces syst~mws (lndiff~remesmnt dasignds au point une station

  14. Development of filtered containment venting system and application for Kashiwazaki-Kariwa Nuclear Power Station Unit 6, 7

    International Nuclear Information System (INIS)

    Murai, Soutarou; Hiranuma, Naoki; Kimura, Takeo; Omori, Shuichi; Watanabe, Fumitoshi; Sasa, Daisuke

    2014-01-01

    The Fukushima Dai-ichi Nuclear Power Station (1F) of Tokyo Electric Power Company (TEPCO) had experienced severe radio-active release to the environment in the Tohoku Region Pacific Coast Earthquake (alias: the Great East Japan Earthquake) in 2011. Under the Station Black-Out (SBO) conditions caused by tsunami with the earthquake, the 1F operators had tried to vent the gasses in the Primary Containment Vessels (PCVs) of the unit 1, 2 and 3 to the environment through the water pools in the suppression chambers of the PCVs. Its venting, however, was imperfect and, as a result, major direct radio-active release to the environment was caused. After this disaster, TEPCO launched a project to develop the Filtered Containment Venting System (FCVS), in which our very bitter experiences in the 1F accident as described above are reflected. One of the main purposes of the development of the FCVS is to enhance operability of venting under the severe plant conditions such as the SBO during progressing of severe core damage, and another is to enhance removal performance of radio-nuclides with the newly added filtering equipment, which is installed in the venting line from the PCV to the outer. The Kashiwazaki-Kariwa NPS unit 6 and 7 will be the first reactors applied the FCVSs. In this paper, we show the design concept of the TEPCO's FCVS, the brief overview of the system design and the summary of experiment which has been performed for getting the performance data of the FCVS such as decontamination factor in various conditions. (author)

  15. Numerical Analysis of Loss of Residual Heal Removal System (RHRS) during Mid-Loop Operation for Hanul NPP Units 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sook Kwan; Park, Seong Gyu; Han, Sang Koo [ACT Co., Daejeon (Korea, Republic of)

    2016-10-15

    As a part of supporting LPSD (Low Power and Shutdown) PSA (Probabilistic Safety Assessment) of Hanul NPP units 1 and 2, numerical analysis for a loss of RHRS (Residual Heat Removal system) during midloop operation was performed using RELAP5/MOD3.3 code. The one of main purpose of thermal hydraulic analysis for PSA work is to estimate times allowable for operation actions in each accident. A loss of RHRS during mid-loop operation may cause more significant results than during RCS full condition due to reduced RCS inventory. In order to perform this kind of analysis, it is particularly important to establish a steady state of mid-loop operational initial condition. Mid-loop operation corresponds to POS(Plant Operational State) 5 and 11 in the category of LPSD PSA at Hanul NPP units 1 and 2. RELAP5/MOD3.3 code was used to predict behaviors of RCS and fuels for the case of loss of RHRS during mid-loop operation at Hanul NPP units 1 and 2. The initial state of mid-loop operational condition was established by proper control of charging and letdown flow. Considering existing similar analysis results for this kind of accident, it can be concluded that RELAP5 code well predicts reasonably the behavior of RCS for loss of RHRS during mid-loop operation in Hanul NPP units 1 and 2. Thus the method developed in the analysis can be applied reasonably to support LPSD PSA.

  16. New representatives of the Raddlesden-Popper homologous series: anion-deficient oxides Sr3Co2-xZnxO6+δ (x=0.5, 0.7)

    International Nuclear Information System (INIS)

    Chupakhina, T.I.; Zajtseva, N.A.; Melkozerova, M.A.; Bazuev, G.V.

    2006-01-01

    New complex oxides Sr 3 Co 2-x Zn x O 6+δ (x=0.5, 0.7) of the Raddlesden-Popper homologous series are synthesized; structural characteristics and magnetic properties are investigated. Lattice parameters are determined. It is established that Sr 3 Co 1.5 Zn 0.5 O 6.25 magnetic susceptibility dependence on temperature follows Curie-Weiss law only within 250-300 K temperature range. In low temperature range the compound has spin glass properties with characteristic phenomena of magnetic and temperature hysteresis [ru

  17. Analysis of glow curve of GaS{sub 0.5}Se{sub 0.5} single crystals

    Energy Technology Data Exchange (ETDEWEB)

    Isik, Mehmet, E-mail: mehmet.isik@atilim.edu.tr [Department of Electrical and Electronics Engineering, Atilim University, 06836 Ankara (Turkey); Delice, Serdar [Department of Physics, Middle East Technical University, 06800 Ankara (Turkey); Gasanly, Nizami [Department of Physics, Middle East Technical University, 06800 Ankara (Turkey); Virtual International Scientific Research Centre, Baku State University, 1148 Baku (Azerbaijan)

    2015-12-15

    Characterization of shallow trapping centers in GaS{sub 0.5}Se{sub 0.5} crystals grown by a Bridgman method was carried out in the present work using thermoluminescence (TL) measurements performed in the low temperature range of 10–300 K. The activation energies of the trapping centers were obtained under the light of results of various analysis methods. The presence of three trapping centers located at 6, 30 and 72 meV was revealed. The analysis of the experimental glow curve gave reasonable results under the model that assumes slow retrapping which states the order of kinetics as b=1. Heating rate dependence of the observed TL peaks was studied for the rates between 0.4 and 1.0 K/s. Distribution of the traps was also investigated using an experimental technique based on the thermal cleaning of centers giving emission at lower temperatures. The distributed levels with activation energies increasing from 6 to 136 meV were revealed by increasing the stopping temperature from 10 to 52 K. - Highlights: • TL measurements were performed in the 10–300 K range on GaS{sub 0.5}Se{sub 0.5} crystals. • Atomic composition ratio of the elements was found. • Three trapping centers located at 6, 30 and 72 meV were revealed. • Distribution of trapping centers was studied on as-grown crystal.

  18. Safety Evaluation Report related to the operation of Clinton Power Station, Unit No. 1 (Docket No. 50-461). Supplement No. 7

    International Nuclear Information System (INIS)

    1986-09-01

    Supplement No. 7 to the Safety Evaluation Report on the application filed by Illinois Power Company, Soyland Power Cooperative, Inc., and Western Illinois Power Cooperative, Inc., as applicants and owners, for a license to operate the Clinton Power Station, Unit No. 1, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Harp Township, DeWitt County, Illinois. This supplement reports the status of items that have been resolved by the staff since Supplement No. 6 was issued

  19. Pilot plant UF6 to UF4 test operations report

    International Nuclear Information System (INIS)

    Bicha, W.J.; Fallings, M.; Gilbert, D.D.; Koch, G.E.; Levine, P.J.; McLaughlin, D.F.; Nuhfer, K.R.; Reese, J.C.

    1987-02-01

    The FMPC site includes a plant designed for the reduction of uranium hexafluoride (UF 6 ) to uranium tetrafluoride (UF 4 ). Limited operation of the upgraded reduction facility began in August 1984 and continued through January 19, 1986. A reaction vessel ruptured on that date causing the plant operation to be shut down. The DOE conducted a Class B investigation with the findings of the investigation board issued in preliminary form in May 1986 and as a final recommendation in July 1986. A two-phase restart of the plant was planned and implemented. Phase I included implementing safety system modifications, changing reaction vessel temperature control strategy, and operating the reduction plant under an 8-week controlled test. The results of the test period are the subject of this report. 41 figs., 11 tabs

  20. 78 FR 32278 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Science.gov (United States)

    2013-05-29

    ... Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to Information in Tier 1, Table... Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, Municipal... Table 3.3-1, ``Definition of Wall Thicknesses for Nuclear Island Buildings, Turbine Buildings, and Annex...

  1. Experimental follow-up of the Bois-Joly GAEC methanization installation - Global assessment, final report, Phase 2 - Unit follow-up protocol. Operation assessment of the Bois-Joly GAEC agricultural discontinuous dry methanization unit. The discontinuous dry process: lessons learned after 6 years of exploitation at the Bois-Joly GAEC

    International Nuclear Information System (INIS)

    Brosset, Denis; Pouech, Philippe; Guillet, Marie; Banville, Sandrine; Bastide, Guillaume; Thual, J.

    2008-06-01

    A first document reports the follow-up study of an existing methanization installation. This study comprises four phases. The first one is a general presentation of the installation. The second one addresses the determination of reference indicators and the definition of the follow-up protocol. The third one is an installation follow-up over two years. The report thus proposes a presentation of the exploitation principles and operation, technical data regarding the methanization installation, the definition of follow-up parameters, protocol and means. It reports the elaboration of technical, environmental and economic indicators, and proposes an analysis of the installation performance, assets and weaknesses while outlining interests and perspectives of a formatted follow-up of methanization installations. Appendices notably contain the phase 2 report related to the unit follow-up protocol, results of physical-chemical composition analyses and of performance tests, a synthetic report of the experimental follow-up. A Power Point presentation reports the operation assessment. Another one proposes a discussion of lessons learned after 6 years of operation of the studied installation and more particularly about its discontinuous dry process. Another Power Point comments the relationship between research and application in the case of this specific process. Two documents and leaflets present the installation and a synthetic report of its experimental follow-up

  2. Modification / procedural changes adopted for safe and smooth operation of Heavy Water Plant, Hazira for maximising productivity and resulting in energy conservation (Paper No. 6.6)

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The Heavy Water Plant at Hazira is based on monothermal ammonia-hydrogen exchange process. The plant is built in two stream for isotopic exchange and enrichment with common facilities for interconnections with fertilizer plant, synthesis unit, amide preparation, utilities and final product, identical to HWP, Thal unit. This plant is built after incorporating some of the improvement effected from operating experiences gained from Baroda, Tuticorin and Thal plants. Plant erection was completed without a single casualty/mishap well within the time schedule and commissioning was completed within six months from charging of synthesis gas and ammonia in the plant. A few modifications of minor/major nature have been incorporated both in the design and during the course of operation. Some procedural changes have also been adopted for flexibility of operation, improved productivity and energy conservation. (author). 2 figs

  3. 49 CFR 192.605 - Procedural manual for operations, maintenance, and emergencies.

    Science.gov (United States)

    2010-10-01

    ... operation of pressure-limiting and control devices. (6) Maintaining compressor stations, including... operations of a pipeline system commence. Appropriate parts of the manual must be kept at locations where..., operating and shutting down gas compressor units. (8) Periodically reviewing the work done by operator...

  4. Renormalization Group Equations of d=6 Operators in the Standard Model Effective Field Theory

    CERN Multimedia

    CERN. Geneva

    2015-01-01

    The one-loop renormalization group equations for the Standard Model (SM) Effective Field Theory (EFT) including dimension-six operators are calculated. The complete 2499 × 2499 one-loop anomalous dimension matrix of the d=6 Lagrangian is obtained, as well as the contribution of d=6 operators to the running of the parameters of the renormalizable SM Lagrangian. The presence of higher-dimension operators has implications for the flavor problem of the SM. An approximate holomorphy of the one-loop anomalous dimension matrix is found, even though the SM EFT is not a supersymmetric theory.

  5. ENDF utility codes release 6.10. Description and operating instructions

    International Nuclear Information System (INIS)

    Dunford, C.L.

    1995-01-01

    Description and operating instructions are given for a package of utility codes operating on evaluated nuclear data files in the formats ENDF-6 (and ENDF-5). Included are the data checking codes CHECKER, FIZCON, PSYCHE; the code INTER for retrieving thermal cross-sections and some other data; graphical plotting subroutines PLOTEF, GRALIB, INTLIB; and the file maintenance and retrieval codes LISTEF, SETMDC, GETMAT, STANEF. This program package which is designed for CDC, IBM, DEC and PC computers, can be obtained on magnetic tape or floppy diskette, free of charge, from the IAEA Nuclear Data Section. (author)

  6. Field measurement of the piping system vibration of Ko-Ri unit 4 during the load-following operation

    International Nuclear Information System (INIS)

    Chung, Tae-Young; Hong, Sung-Yull; Kim, Bum-Nyun.

    1989-01-01

    During the load-following operation of nuclear power plants, flow rate, temperature, and pressure in the piping system can be varied by changing the electric power output level, and these variations can cause different vibration phenomena in the piping system. The piping system vibration is important because it is directly related to the dynamic stress of the piping system and can affect the life of the piping system through structural fatigue. An assessment of vibration levels for the classes II and III piping systems of the Ko-Ri Unit 4950-MW nuclear power plant was performed according to the given pattern of the load-following operation to study its feasibility from the viewpoint of piping system vibration. The classes II and III piping system vibration of the Ko-Ri Unit 4 may not cause any potential problem under the given pattern of the load-following operation; however, it is recommended that long-term operation in the 85 to 95% power range be avoided as much as possible

  7. Synthesis, structural characteristics and dielectric properties of a new K{sub 2}NiF{sub 4}-type phase Sr{sub 2}Mn{sub 0.5}Ti{sub 0.5}O{sub 4}

    Energy Technology Data Exchange (ETDEWEB)

    Chupakhina, T.I., E-mail: chupakhina@ihim.uran.ru [Institute of Solid State Chemistry of the Ural Branch of the Russian Academy of Sciences, 91, Pervomaiskaya Str., Ekaterinburg (Russian Federation); Melnikova, N.V. [Ural Federal University, 19, Mira Str., Ekaterinburg (Russian Federation); Gyrdasova, O.I. [Institute of Solid State Chemistry of the Ural Branch of the Russian Academy of Sciences, 91, Pervomaiskaya Str., Ekaterinburg (Russian Federation)

    2016-06-15

    A new K{sub 2}NiF{sub 4}-type phase Sr{sub 2}Mn{sub 0,5}Ti{sub 0,5}O{sub 4} have been synthesized by a sol–gel procedure and characterized by X-ray powder diffraction, thermogravimetric analysis and scanning electron microscopy. There are no oxide ion vacancies in these materials; oxidation states of manganese and titanium were estimated as +4. Rietveld profile analysis shows that the phase crystallizes with tetragonal unit cell in the space group I4/mmm. Substitution of Ti{sup 4+} for Mn{sup 4+} does not affect the distortion of coordination polyhedra (Mn,Ti)O{sub 6} and SrO{sub 9}. The dielectric properties of the ceramic samples are caused by structural and charge characteristics, regular coordination polyhedra SrO{sub 9} and lack of charge ordering, which can lead to significant permittivity. Increase of the dielectric constant at temperatures above 453 K is caused mainly by the grain boundary processes explained in terms of the Maxwell–Wagner polarization model. - Highlights: • The new complex oxide Sr{sub 2}Mn{sub 0,5}Ti{sub 0,5}O{sub 4} was prepared. • The structures of the compound were analyzed by Rietveld refinement. • Distortions of SrO{sub 9} and (Mn,Ti)O{sub 6} polyhedra are not strong. • Dielectric properties are determined by regular structure and lack of charge ordering. • Permittivity increase under heat is associated with processes at the grain boundaries.

  8. 40 CFR Table 14 to Subpart Uuu of... - Continuous Compliance With Operating Limits for Organic HAP Emissions From Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Compliance With Operating Limits for Organic HAP Emissions From Catalytic Cracking Units 14 Table 14 to Subpart UUU of Part 63... Compliance With Operating Limits for Organic HAP Emissions From Catalytic Cracking Units As stated in § 63...

  9. 40 CFR Table 21 to Subpart Uuu of... - Continuous Compliance With Operating Limits for Organic HAP Emissions From Catalytic Reforming Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Compliance With Operating Limits for Organic HAP Emissions From Catalytic Reforming Units 21 Table 21 to Subpart UUU of Part 63... Compliance With Operating Limits for Organic HAP Emissions From Catalytic Reforming Units As stated in § 63...

  10. Regulating manure application discharges from concentrated animal feeding operations in the United States

    International Nuclear Information System (INIS)

    Centner, Terence J.; Feitshans, Theodore A.

    2006-01-01

    In the United States, reducing pollution from agriculture has received attention due to data suggesting that this is the leading source of impairment of many waterbodies. The federal government revised its regulations governing concentrated animal feeding operations (CAFOs) to enhance governmental oversight over sources of pollution. For the application of manure resulting in pollutant discharges, CAFOs need to implement nutrient management plans. A federal court affirmed the ability of the US federal government to oversee the application of manure from CAFOs that have discharges. Simultaneously, owners and operators of CAFOs who have implemented an appropriate nutrient management plan may forgo securing a permit if their discharges qualify under the agricultural stormwater discharge exemption. - New rules applying to the application of manure by large concentrated animal feeding operations should reduce water contamination

  11. Phase I and II feasibility study report for the 300-FF-5 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018.

  12. Phase I and II feasibility study report for the 300-FF-5 operable unit

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018

  13. Radioactive effluents from CANDU 6 reactors during normal operation

    International Nuclear Information System (INIS)

    Boss, C.R.; Allsop, P.J.

    1995-12-01

    During routine operation of a CANDU 6 reactor, various gaseous, liquid, and solid radioactive wastes are generated. The layout of the CANDU 6 reactor and the design of its systems ensure that these are minimized, but small quantities of gaseous and liquid wastes are continually discharged at very low concentrations. This report discusses the make-up of these chronically generated gaseous and liquid effluents. From a safety perspective, the doses to individual members of the public resulting from radioactive wastes chronically discharged from CANDU 6 reactors have been negligible. Similarly, doses to the regional and global populations have been negligible, generally less than 0.001% of background. While far below regulatory limits, releases of tritium, noble gases and gross β - -γ have been the most radiologically significant emissions, while radioiodine and particulates have had the greatest potential to deliver public dose. (author). 8 refs., 16 tabs., 3 figs

  14. Anticorrosion and halobios control for tidal power generating units

    International Nuclear Information System (INIS)

    Shen, J C; Ding, L X

    2012-01-01

    The anticorrosion and halobios control is the key techniquesrelated to the safety and durability of tidal power generating units. The technique of material application, antifouling coating and cathodic protection are often adopted. The technical research, application, updating and development are carried on Jiangxia Tidal Power Station, which is based on the old Unit 1-Unit 5 operated for nearly 30 years, and the new Unit 6 operated in 2007. It is found that stainless steeland the antifouling coating used in Unit 1- Unit 5 are very effective, but cathodic protection is often likely to fail because of the limitation of structure and installation. Analyses and studies for anticorrosion and halobios control techniques of tidal power generating units according to theory, experience and actual effects have been done, which can be for reference to the tidal power station designers and builders.

  15. Anticipating and addressing workplace static magnetic field effects at levels <0.5 mT.

    Science.gov (United States)

    Emery, R J; Hopkins, J R; Charlton, M A

    2000-11-01

    Magnetic resonance, once a research tool limited to the basic sciences, has experienced an increase in popularity due to its unique ability to analyze certain living systems in vivo. Expanding applications in the biomedical sciences have resulted in magnetic sources being located in research institutions nationally. Space and resource limitations sometimes necessitate siting magnetic resonance units in proximity to other institutional operations. For magnetic field shielding and personnel protection considerations, the generally accepted 0.5 mT (milliTesla) limit for implanted cardiac devices is commonly used as the conservative basis for decisions. But the effects of magnetic fields on equipment can be easily observed at levels far below 0.5 mT, often resulting in concern and apprehension on the part of personnel in the surrounding areas. Responding to recurrent worker concerns spawned by noticeable effects on equipment at exposure levels information, practicing radiation safety professionals can better anticipate facility incompatibility issues and improve their responses to worker concerns initiated by observed effects on equipment.

  16. Start up and commercial operation of Laguna Verde nuclear power plant. Unit 1

    International Nuclear Information System (INIS)

    Torres Ramirez, J.F.

    1991-01-01

    Prior to start up of Laguna Verde nuclear power plant preoperational tests and start tests were performed and they are described in its more eminent aspects. In relation to commercial operation of nuclear station a series of indicator were set to which allow the measurement of performance in unit 1, in areas of plant efficiency and personal safety. Antecedents. Laguna Verde station is located in Alto Lucero municipality in Veracruz state, 70 kilometers north-northeast from port of Veracruz and a 290 kilometers east-northeast from Mexico city. The station consist of two units manufactured by General Electric, with a nuclear system of vapor supply also called boiling water (BWR/5), and with a system turbine-generator manufactured by Mitsubishi. Each unit has a nominal power of 1931 MWt and a level design power of 675 Mwe and a net power of 654 Electric Megawatts

  17. Premedication with gabapentin, alprazolam or a placebo for abdominal hysterectomy: Effect on pre-operative anxiety, post-operative pain and morphine consumption

    Directory of Open Access Journals (Sweden)

    Tim Thomas Joseph

    2014-01-01

    Full Text Available Background and Aims : Utility of gabapentin for pre-operative anxiolysis as compared to commonly administered alprazolam is not evident. The aim of the present study was to compare the effects of pre-operative oral gabapentin 600 mg, alprazolam 0.5 mg or a placebo on pre-operative anxiety along with post-operative pain and morphine consumption. Methods: Seventy five patients scheduled for abdominal hysterectomy under general anaesthesia were included. Groups gabapentin, alprazolam and placebo, received oral gabapentin 600 mg, alprazolam 0.5 mg and one capsule of oral B-complex forte with Vitamin C respectively, on the night prior to surgery and 2 h prior to surgery. Visual analogue scale (VAS was used to measure the anxiety and post-operative pain. All patients received patient-controlled analgesia. Statistical tests used were Kruskal-Wallis test, Wilcoxon signed rank test and one-way ANOVA. Results: Alprazolam provided significant anxiolysis (median [interquartile range] baseline VAS score 35 [15.5, 52] to 20 [6.5, 34.5] after drug administration; P = 0.007. Gabapentin did not provide significant decrease in anxiety (median [interquartile range] VAS score 21 [7.5, 41] to 20 [6.5, 34.5]; P = 0.782. First analgesic request time (median [interquartile range in minutes] was longer in group gabapentin (17.5 [10, 41.25] compared to group placebo (10 [5, 15] (P = 0.019 but comparable to that in group alprazolam (15 [10, 30]. Cumulative morphine consumption at different time periods and total morphine consumption (mean [standard deviation] at the end of study period (38.65 [18.04], 39.91 [15.73], 44.29 [16.02] mg in group gabapentin, alprazolam and placebo respectively were comparable. Conclusion: Gabapentin 600 mg does not have significant anxiolytic effect compared to alprazolam 0.5 mg. Alprazolam 0.5 mg was found to be an effective anxiolytic in the pre-operative period. Neither alprazolam nor gabapentin, when compared to placebo showed any opioid

  18. Report on geological surveys in the 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Sandness, G.A.

    1991-03-01

    This report describes a set of geophysical surveys performed by the Pacific Northwest Laboratory at selected locations within the 300-FF-1 Operable Unit at Hanford. Field work and preliminary data processing activities were initiated in September 1989. These actions were terminated by the Westinghouse Hanford Company before completion in December 1989. Work was reinitiated in October 1990, to complete the processing of the data that had already been collected and to report the results. Because the field work was only partially completed, the task objectives, as presented in the Statement of Work, could not be fully met. This report is, therefore, a progress report covering the work performed through December 11, 1989. This task involved (1) ground-penetrating radar surveys of the 618-4 and 618-5 Burial Grounds, and (2) ground-penetrating radar and electromagnetic induction surveys along the assumed routes of the abandoned process sewers and radioactive liquid waste sewers in the 300-FF-1 Operable Unit. The surveys in the burial grounds were intended to identify burial trenches and pits, to determine the depth of fill, and to locate waste materials, including any that might be outside the perimeter fences. The surveys along the sewer routes were intended, first, to confirm the locations of the sewers as shown on existing maps or to otherwise accurately determine their locations, and second, to attempt to identify locations of possible leaks. 3 refs., 3 figs., 2 tabs

  19. 40 CFR Table 7 to Subpart Uuu of... - Continuous Compliance With Operating Limits for Metal HAP Emissions From Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Compliance With Operating Limits for Metal HAP Emissions From Catalytic Cracking Units 7 Table 7 to Subpart UUU of Part 63... With Operating Limits for Metal HAP Emissions From Catalytic Cracking Units As stated in § 63.1564(c)(1...

  20. Safety evaluation report related to the operation of Catawba Nuclear Station, Units 1 and 2. Docket Nos. 50-413 and 50-414, Duke Power Company, et al

    International Nuclear Information System (INIS)

    1983-02-01

    The Safety Evaluation Report for the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Electric Membership Corporation, and Saluda River Electric Cooperative, Inc. as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  1. Analysis of the Vertical Takeoff and Landing Unmanned Aerial Vehicle (VTUAV) in Small Unit Urban Operations

    National Research Council Canada - National Science Library

    Cason, Roman

    2004-01-01

    ...) to replace the aging Pioneer Unmanned Aerial Vehicle (UAV) system. This thesis examines the critical elements this platform must possess to effectively support small units operating in urban environments...

  2. Energetic Analysis of Poultry Processing Operations

    Directory of Open Access Journals (Sweden)

    Simeon Olatayo JEKAYINFA

    2007-01-01

    Full Text Available Energy audit of three poultry processing plants was conducted in southwestern Nigeria. The plants were grouped into three different categories based on their production capacities. The survey involved all the five easily defined unit operations utilized by the poultry processing industry and the experimental design allowed the energy consumed in each unit operation to be measured. The results of the audit revealed that scalding & defeathering is the most energy intensive unit operation in all the three plant categories, averagely accounting for about 44% of the total energy consumption in the processing plants. Other processing operations consuming energy in the following order are eviscerating (17.5%, slaughtering (17%, washing & chilling (16% and packing (6%. The results of the study clearly indicated that the least mechanized of the plants consumed the highest energy (50.36 MJ followed by the semi-mechanized plant (28.04 MJ and the most mechanized plant (17.83 MJ. The energy audits have provided baseline information needed for carrying out budgeting, forecasting energy requirements and planning plant expansion in the poultry processing industries in the study area.

  3. Post-Mortem Analysis after High-Power Operation of the TD24_R05 Tested in Xbox_1

    CERN Document Server

    Degiovanni, Alberto; Mouriz Irazabal, Nerea; Aicheler, Markus

    2016-01-01

    The CLIC prototype structure TD24_R05 has been high power tested in Xbox_1 in 2013. This report summarizes all examinations conducted after the high power test including bead-pull measurements, structure cutting, metrology and SEM observations. A synthesis of the various results is then made. The structure developed a hot cell progressively during operation and detuning was observed after the test was complete. The post mortem examination clearly showed a developed standing wave pattern which was explained by the physical deformation of one of the coupler iris. An elevated breakdown count through SEM imaging in the suspected hot cell however could not be confirmed. Neither any particular feature offering an explanation for the observed longitudinal breakdown distribution could be detected.

  4. Unit operations used to treat process and/or waste streams at nuclear power plants

    International Nuclear Information System (INIS)

    Godbee, H.W.; Kibbey, A.H.

    1980-01-01

    Estimates are given of the annual amounts of each generic type of LLW [i.e., Government and commerical (fuel cycle and non-fuel cycle)] that is generated at LWR plants. Many different chemical engineering unit operations used to treat process and/or waste streams at LWR plants include adsorption, evaporation, calcination, centrifugation, compaction, crystallization, drying, filtration, incineration, reverse osmosis, and solidification of waste residues. The treatment of these various streams and the secondary wet solid wastes thus generated is described. The various treatment options for concentrates or solid wet wastes, and for dry wastes are discussed. Among the dry waste treatment methods are compaction, baling, and incineration, as well as chopping, cutting and shredding. Organic materials [liquids (e.g., oils or solvents) and/or solids], could be incinerated in most cases. The filter sludges, spent resins, and concentrated liquids (e.g., evaporator concentrates) are usually solidified in cement, or urea-formaldehyde or unsaturated polyester resins prior to burial. Incinerator ashes can also be incorporated in these binding agents. Asphalt has not yet been used. This paper presents a brief survey of operational experience at LWRs with various unit operations, including a short discussion of problems and some observations on recent trends

  5. Dielectric and Ferroelectric Properties of SrTiO3-Bi0.5Na0.5TiO3-BaAl0.5Nb0.5O3 Lead-Free Ceramics for High-Energy-Storage Applications.

    Science.gov (United States)

    Yan, Fei; Yang, Haibo; Lin, Ying; Wang, Tong

    2017-11-06

    Pulsed capacitors require high-recoverable energy-storage density (W rec ) and high energy-storage efficiency (η), which can be realized through the selection and adjustment of the composition. In this work, (1 - x)SrTiO 3 -x(0.95Bi 0.5 Na 0.5 TiO 3 -0.05BaAl 0.5 Nb 0.5 O 3 ) [(1 - x)ST-x(BNT-BAN)] ceramics were successfully prepared via the pressureless solid-state reaction method. The dielectric constant increases gradually with the introduction of BNT-BAN and obtains a maximum value of 3430 with the composition of 0.4ST-0.6(BNT-BAN) at 100 Hz, which is 10.39 times higher than that of the pure ST sample (∼330). Dispersive relaxor behaviors and ferroelectric performances can be enhanced with the introduction of BNT-BAN. The composition of 0.5ST-0.5(BNT-BAN) exhibits a high W rec of 1.89 J/cm 3 as well as a high η of 77%. Therefore, the (1 - x)ST-x(BNT-BAN) systems are candidate materials for pulsed capacitor applications.

  6. Automated processing of whole blood units: operational value and in vitro quality of final blood components.

    Science.gov (United States)

    Jurado, Marisa; Algora, Manuel; Garcia-Sanchez, Félix; Vico, Santiago; Rodriguez, Eva; Perez, Sonia; Barbolla, Luz

    2012-01-01

    The Community Transfusion Centre in Madrid currently processes whole blood using a conventional procedure (Compomat, Fresenius) followed by automated processing of buffy coats with the OrbiSac system (CaridianBCT). The Atreus 3C system (CaridianBCT) automates the production of red blood cells, plasma and an interim platelet unit from a whole blood unit. Interim platelet unit are pooled to produce a transfusable platelet unit. In this study the Atreus 3C system was evaluated and compared to the routine method with regards to product quality and operational value. Over a 5-week period 810 whole blood units were processed using the Atreus 3C system. The attributes of the automated process were compared to those of the routine method by assessing productivity, space, equipment and staffing requirements. The data obtained were evaluated in order to estimate the impact of implementing the Atreus 3C system in the routine setting of the blood centre. Yield and in vitro quality of the final blood components processed with the two systems were evaluated and compared. The Atreus 3C system enabled higher throughput while requiring less space and employee time by decreasing the amount of equipment and processing time per unit of whole blood processed. Whole blood units processed on the Atreus 3C system gave a higher platelet yield, a similar amount of red blood cells and a smaller volume of plasma. These results support the conclusion that the Atreus 3C system produces blood components meeting quality requirements while providing a high operational efficiency. Implementation of the Atreus 3C system could result in a large organisational improvement.

  7. Use of a pitot-static probe for determining wing section drag in flight at Mach numbers from 0.5 to approximately 1.0

    Science.gov (United States)

    Montoya, L. C.; Economu, M. A.; Cissell, R. E.

    1974-01-01

    The use of a pitot-static probe to determine wing section drag at speeds from Mach 0.5 to approximately 1.0 was evaluated in flight. The probe unit is described and operational problems are discussed. Typical wake profiles and wing section drag coefficients are presented. The data indicate that the pitot-static probe gave reliable results up to speeds of approximately 1.0.

  8. Magnetic properties of the HoMn6-xFe xSn6 compounds

    International Nuclear Information System (INIS)

    Cakir, O.; Dincer, I.; Duman, E.; Krenke, T.; Elmali, A.; Elerman, Y.

    2007-01-01

    Intermetallic compounds of HoMn 6-x Fe x Sn 6 (0 ≤ x ≤ 1.2) were studied by means of field-cooled (FC) and zero-field-cooled (ZFC) magnetization measurements in the temperature range 5 K ≤ T ≤ 600 K. The unit cell parameters decrease with the increasing of Fe content. The compounds with x = 0 and 0.3 behave ferrimagnetically in the whole temperature range and spin reorientation transition is observed at 200 and 185 K, respectively. The x = 0.5 and 0.6 compounds show ferrimagnetic-helimagnetic-ferrimagnetic phase transitions with decreasing temperature while the compounds with x = 0.9 and 1.2 only show helimagnetic-ferrimagnetic phase transitions. Additionally, for the x = 0.6 compound the metamagnetic phase transition from helimagnetism to ferrimagnetism is induced by an applied field 20 kOe

  9. Microstructural analysis nanoferritas Mn_0_,_5Zn_0_,_5Fe_2O_4 e Mn_0_,_6_5Zn_0_,_3_5Fe_2O_4 synthesized by combustion reaction

    International Nuclear Information System (INIS)

    Diniz, V.C.S.; Figueiredo, A.R.; Costa Junior, A.D.S.; Diniz, H.M.; Vieira, D.A.; Costa, A.C.F.M.

    2014-01-01

    The MnZn ferrites are ferrimagnetic materials that have been studied and used in various technological fields. In this work investigated the microstructural characteristics of ferrites and Mn_0_,_5Zn_0_,_5Fe_2O_4 Mn_0_,_6_5Zn_0_,_3_5Fe_2O_4 synthesized by combustion reaction in 200g scale production. The samples were characterized by XRD, crystallinity, crystallite size, X-ray fluorescence and scanning electron microscopy. Given the results it was observed that for both samples the synthesis combustion reaction was efficient for the production of single-phase ferrites with high crystallinity. With respect to the analysis of X-ray fluorescence was noted that the experimental values composition were consistent with the theoretical values calculated for both samples. Regarding morphology for both samples, the formation of the porous powders with feature consisting of dense clumps in the form of irregular foam was observed. (author)

  10. Dose rate evaluation of workers on the operation floor in Fukushima-Daiichi Unit 3

    Science.gov (United States)

    Matsushita, Kaoru; Kurosawa, Masahiko; Shirai, Keisuke; Matsuoka, Ippei; Mukaida, Naoki

    2017-09-01

    At Fukushima Daiichi Nuclear Power Plant Unit 3, installation of a fuel handling machine is planned to support the removal of spent fuel. The dose rates at the workplace were calculated based on the source distribution measured using a collimator in order to confirm that the dose rates on the operation floor were within a manageable range. It was confirmed that the accuracy of the source distribution was C/M = 1.0-2.4. These dose rates were then used to plan the work on the operation floor.

  11. Development of in-situ product removal strategies in biocatalysis applying scaled-down unit operations

    DEFF Research Database (Denmark)

    Heintz, Søren; Börner, Tim; Ringborg, Rolf Hoffmeyer

    2017-01-01

    different process steps while operating it as a combined system, giving the possibility to test and characterize the performance of novel process concepts and biocatalysts with minimal influence of inhibitory products. Here the capabilities of performing process development by applying scaled-down unit...... operations are highlighted through a case study investigating the asymmetric synthesis of 1-methyl-3-phenylpropylamine (MPPA) using ω-transaminase, an enzyme in the sub-family of amino transferases (ATAs). An on-line HPLC system was applied to avoid manual sample handling and to semi...

  12. 46 CFR 35.05-25 - Illness, alcohol, drugs-TB/ALL.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Illness, alcohol, drugs-TB/ALL. 35.05-25 Section 35.05-25 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS OPERATIONS Officers and Crews § 35.05-25 Illness, alcohol, drugs—TB/ALL. (a) No person, known by the individual in charge of a tank...

  13. Potential contribution of currently operating nuclear-fueled electric-generating units to reducing US oil consumption

    International Nuclear Information System (INIS)

    Koppe, R.H.; Olson, E.A.J.; Van Howe, K.R.

    1980-01-01

    This study examines the prospect for performance improvement in the 62 light water reactors in operation in the US as of the end of last year and which are deemed to have current commercial design features. These units represent a total net capacity of 49,481 MW(e). In the last two years (1978 to 1979), total capacity factor losses for these units was 36.5%. This study finds that in the short-term, capacity factor improvement of about 16% could be achieved, for example, in response to a short-term energy crisis. In the long-term a gain of perhaps 18% could be achieved. Such gains would represent a decrease in equivalent oil consumption of approximately 350,000 barrels a day. In addition, this study evaluated potential increases in the operating power level of these units, and concluded that a short term power level increase of about 2500 MW(e) could be achieved, in addition to a long term increase of about 1700 MW(e). This total short term power level increase would be equivalent to 138,000 barrels of oil per day

  14. 40 CFR 257.5 - Disposal standards for owners/operators of non-municipal non-hazardous waste disposal units that...

    Science.gov (United States)

    2010-07-01

    ... compliance with §§ 257.7 through 257.30 prior to the receipt of CESQG hazardous waste. (b) Definitions.... Waste management unit boundary means a vertical surface located at the hydraulically downgradient limit.../operators of non-municipal non-hazardous waste disposal units that receive Conditionally Exempt Small...

  15. 48 CFR 970.3102-05 - Selected costs.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Selected costs. 970.3102... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contract Cost Principles and Procedures 970.3102-05 Selected costs. ...

  16. 46 CFR 111.05-13 - Grounding connection.

    Science.gov (United States)

    2010-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-13 Grounding... power sources operating in parallel in the system. ...

  17. Continuous operation of NPP Kori Unit 1 - Fireproof paint for cables

    International Nuclear Information System (INIS)

    Wendt, Dipl-Ing. Ruediger; Kim, Duill; Sik, Cho Hong

    2008-01-01

    Fireproof cable coating materials have been used in European NPP, especially in Germany, Russia, Ukraine, Czech Republic, Lithuania, Switzerland. Wide experiences were made during operation while applying these systems. In NPP Kori, Unit 1, a fire proof cable coating project was realised for the first time in a NPP of KHNP. The scope of services of the cable trays to coat amounts to 15,587m 2 . In different fire compartments and rooms the cables should be coated partially respectively completely with the fire proof cable coating system. The extent of cable surfaces to coat was stipulated by KHNP on the basis of an analysis made by KHNP. The project was tendered on the basis of a technical specification of KHNP. The specification is mainly predicted on Korean and US standards. The most important criteria for the fire proof cable coating is resumed as follows: The fireproof cable coating has to assure the fire protection of the cables for a period defined and for operational conditions defined in such a manner that the general conditions for the operation of the cable installation will not be affected

  18. 40 CFR Table 30 to Subpart Uuu of... - Operating Limits for HAP Emissions From Sulfur Recovery Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits for HAP Emissions From Sulfur Recovery Units 30 Table 30 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL..., Table 30 Table 30 to Subpart UUU of Part 63—Operating Limits for HAP Emissions From Sulfur Recovery...

  19. NSSS design and cycle 1 operating history data for Arkansas Nuclear One, Unit-2. Final report

    International Nuclear Information System (INIS)

    Gagne, P.A.

    1981-03-01

    This report contains design and cycle 1 operating data for the Arkansas Nuclear One, Unit-2 nuclear steam supply system. The design data include descriptions of the reactor core, reactor coolant system, and control systems which are a part of the nuclear steam supply system. Operating history data are provided for the period of December 1978 through January 1980. The most important operating history data provided include reactor power, cumulative fuel burnup, control rod position, primary coolant temperature, and a series of power distribution state points

  20. THE UDF05 FOLLOW-UP OF THE HUBBLE ULTRA DEEP FIELD. III. THE LUMINOSITY FUNCTION AT z ∼ 6

    International Nuclear Information System (INIS)

    Su Jian; Stiavelli, Massimo; Bergeron, Eddie; Bradley, Larry; Dahlen, Tomas; Ferguson, Henry C.; Koekemoer, Anton; Lucas, Ray A.; Panagia, Nino; Pavlovsky, Cheryl; Oesch, Pascal; Carollo, Marcella; Lilly, Simon; Trenti, Michele; Giavalisco, Mauro; Mobasher, Bahram

    2011-01-01

    In this paper, we present a derivation of the rest-frame 1400 A luminosity function (LF) at redshift six from a new application of the maximum likelihood method by exploring the five deepest Hubble Space Telescope/Advanced Camera for Surveys (HST/ACS) fields, i.e., the Hubble Ultra Deep Field, two UDF05 fields, and two Great Observatories Origins Deep Survey fields. We work on the latest improved data products, which makes our results more robust than those of previous studies. We use unbinned data and thereby make optimal use of the information contained in the data set. We focus on the analysis to a magnitude limit where the completeness is larger than 50% to avoid possibly large errors in the faint end slope that are difficult to quantify. We also take into account scattering in and out of the dropout sample due to photometric errors by defining for each object a probability that it belongs to the dropout sample. We find the best-fit Schechter parameters to the z ∼ 6 LF are α = 1.87 ± 0.14, M * = -20.25 ± 0.23, and φ * = 1.77 +0.62 -0.49 x 10 -3 Mpc -3 . Such a steep slope suggests that galaxies, especially the faint ones, are possibly the main sources of ionizing photons in the universe at redshift six. We also combine results from all studies at z ∼ 6 to reach an agreement in the 95% confidence level that -20.45 * < -20.05 and -1.90 < α < -1.55. The luminosity density has been found not to evolve significantly between z ∼ 6 and z ∼ 5, but considerable evolution is detected from z ∼ 6 to z ∼ 3.

  1. Organization and methodology applied to the control of commissioning tests to guarantee safe operation of nuclear units

    International Nuclear Information System (INIS)

    Clausner, J.P.; Jorel, M.

    1990-12-01

    This paper describes the activities of the Safety Analysis Department (DAS), which provides technical support for the French safety authorities in the specific context of analysis and control of startup test programme quality at each of the different stages of the programme. These activities combine to ensure that the objective of the startup tests is reached, in particular that the functions of each safety-related system are guaranteed in all operating configurations, that the performance levels of all components in the system comply with design criteria and that defects revealed during previous tests have been dealt with correctly. The special case of French nuclear facilities, linked to unit standardization, has made it possible to acquire a large amount of experience with the startup of the 900 MWe units and has illustrated the importance of defining a startup test programme. In 1981, a working group, comprising operating organization and safety authority representatives, studied the lessons which had to be learned from 900 MWe unit startup and the improvements which could be made and taken into account in the 1300 MWe unit startup programme. To illustrate the approach adopted by the DAS, we go on to describe the lessons learned from startup of the first 1300 MWe (P4) units

  2. How do strategic decisions and operative practices affect operating room productivity?

    Science.gov (United States)

    Peltokorpi, Antti

    2011-12-01

    Surgical operating rooms are cost-intensive parts of health service production. Managing operating units efficiently is essential when hospitals and healthcare systems aim to maximize health outcomes with limited resources. Previous research about operating room management has focused on studying the effect of management practices and decisions on efficiency by utilizing mainly modeling approach or before-after analysis in single hospital case. The purpose of this research is to analyze the synergic effect of strategic decisions and operative management practices on operating room productivity and to use a multiple case study method enabling statistical hypothesis testing with empirical data. 11 hypotheses that propose connections between the use of strategic and operative practices and productivity were tested in a multi-hospital study that included 26 units. The results indicate that operative practices, such as personnel management, case scheduling and performance measurement, affect productivity more remarkably than do strategic decisions that relate to, e.g., units' size, scope or academic status. Units with different strategic positions should apply different operative practices: Focused hospital units benefit most from sophisticated case scheduling and parallel processing whereas central and ambulatory units should apply flexible working hours, incentives and multi-skilled personnel. Operating units should be more active in applying management practices which are adequate for their strategic orientation.

  3. 33 CFR 163.05 - Tows of seagoing barges within inland waters.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Tows of seagoing barges within inland waters. 163.05 Section 163.05 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... inland waters. (a) The tows of seagoing barges when navigating the inland waters of the United States...

  4. Corrective economic dispatch and operational cycles for probabilistic unit commitment with demand response and high wind power

    International Nuclear Information System (INIS)

    Azizipanah-Abarghooee, Rasoul; Golestaneh, Faranak; Gooi, Hoay Beng; Lin, Jeremy; Bavafa, Farhad; Terzija, Vladimir

    2016-01-01

    Highlights: • Suggesting a new UC mixing a probabilistic security and incentive demand response. • Investigating the effects of uncertainty on UC using chance-constraint programming. • Proposing an efficient spinning reserve satisfaction based on a new ED correction. • Presenting a new operational cycles way to convert binary variable to discrete one. - Abstract: We propose a probabilistic unit commitment problem with incentive-based demand response and high level of wind power. Our novel formulation provides an optimal allocation of up/down spinning reserve. A more efficient unit commitment algorithm based on operational cycles is developed. A multi-period elastic residual demand economic model based on the self- and cross-price elasticities and customers’ benefit function is used. In the proposed scheme, the probability of residual demand falling within the up/down spinning reserve imposed by n − 1 security criterion is considered as a stochastic constraint. A chance-constrained method, with a new iterative economic dispatch correction, wind power curtailment, and commitment of cheaper units, is applied to guarantee that the probability of loss of load is lower than a pre-defined risk level. The developed architecture builds upon an improved Jaya algorithm to generate feasible, robust and optimal solutions corresponding to the operational cost. The proposed framework is applied to a small test system with 10 units and also to the IEEE 118-bus system to illustrate its advantages in efficient scheduling of generation in the power systems.

  5. 14 CFR 204.6 - Certificated and commuter air carriers proposing a change in operations, ownership, or management...

    Science.gov (United States)

    2010-01-01

    ... proposing a change in operations, ownership, or management which is not substantial. 204.6 Section 204.6... carriers proposing a change in operations, ownership, or management which is not substantial. Carriers proposing to make a change which would not substantially affect their operations, management, or ownership...

  6. Evaluation of personality features of nuclear power plant operators: investigation with Minnesota Multiphasic Personality Inventory

    International Nuclear Information System (INIS)

    Sun Yiling; Liu Yulong; Li Yuan; Bian Huahui; Bi Jinling; Qiu Mengyue; Liu Chunfeng

    2011-01-01

    Objective: To explore the personality features of nuclear power plant operators and the influencing factors thereof. Methods: Minnesota Multiphasic Personality Inventory was used to examine the personality features of 136 nuclear power plant operators randomly selected from 2 cooperative units, all males. The results were compared with the nationwide norms and subsequently an inter-block contrast analysis was carried out. Results: Obvious difference was observed in the final scores between the nuclear power plant operators and nationwide norms. The former got higher scores on hysteria (t=3.05, P<0.05), and lower scores on hypochondriasis, depression, morbid personality, masculinity-femininity, paranoia, psychasthenia, schizophrenia, hypomania, and social introversion(t=7.47, 7.47, 7.31, 2.23, 15.09, 16.15, 19.28, 7.88, 11.10, P<0.05). The scores on hypochondriasis, depression, schizophrenia, and social introversion of those with the length of services over 3 years were all significantly higher than those of with the length of services less than 3 years (t=3.25, 2.51, 2.76, 3.00, P<0.05). The scores on hypochondriasis, depression, psychopathicdeviate, and social introversion of the operators aged over 30 were all significantly higher than those of the operators aged below 30 (t=2.36, 2.35, 2.01, 2.54, P<0.05). Conclusions: The psychological quality of the nuclear power plant operators is superior to that of the general population. (authors)

  7. Indian Point Station, Unit 1 and 2. Semiannual operating report No. 24, July--December 1974

    International Nuclear Information System (INIS)

    1975-01-01

    Net electrical power generated by Unit 1 was 519,130 MWH with the reactor critical for 2,400.39 hours and the generator on line for 2,316.14 hours. Unit 2 generated 2,427,828 MWH electrical power, was critical for 3,590.31 hours and the generator was on line for 3,485.41 hours. Operations and maintenance are summarized. Information is presented concerning radioactive effluent releases, occupational personnel radiation protection, primary coolant chemistry, changes, tests, and experiments. Environmental radioactivity is discussed. (U.S.)

  8. Chemistry control at Bruce NGS 'B' from constructed to commercial operation

    International Nuclear Information System (INIS)

    Roberts, J.G.

    1987-01-01

    Pre-operational storage chemistry and flushing of the secondary side is described. The approach devised for Bruce NGS 'B' Unit 6 was unique for an Ontario Hydro Nuclear Unit. The significance of the improved Construction installation and Quality Assurance procedures, combined with those of Operations is identified. Secondary side chemistry during both commissioning and later operation is reported. It will be shown that the application of ALARA (As Low As is Reasonably Achievable) concept has resulted in tighter chemical specifications being met

  9. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  10. 6-Alkyl-, 6-aryl- or 6-hetaryl-7-deazapurine ribonucleosides as inhibitors of human or MTB adenosine kinase and potential antimycobacterial agents

    Czech Academy of Sciences Publication Activity Database

    Perlíková, Pavla; Konečný, P.; Nauš, Petr; Snášel, Jan; Votruba, Ivan; Džubák, P.; Pichová, Iva; Hajdúch, M.; Hocek, Michal

    2013-01-01

    Roč. 4, č. 11 (2013), s. 1497-1500 ISSN 2040-2503 R&D Projects: GA ČR GAP207/11/0344 EU Projects: European Commission(XE) 241587 - SYSTEMTB Grant - others:Operational Programme Research and Development for Innovations(XE) CZ.1.05/2.1.00/01.0030 Institutional support: RVO:61388963 Keywords : mycobacterium- tuberculosis * enzyme-inhibition * 6-(het)aryl-7-deazapurine ribonucleosides Subject RIV: CC - Organic Chemistry Impact factor: 2.626, year: 2013

  11. Mo0.5W0.5S2 for Q-switched pulse generation in ytterbium-doped fiber laser

    Science.gov (United States)

    Wang, Junli; Chen, Lei; Dou, Chenxi; Yan, Haiting; Meng, Lingjie; Wei, Zhiyi

    2018-06-01

    In this work, we fabricate the Mo0.5W0.5S2 by microwave-assisted solvothermal method, and report the Q-switched Yb-doped fiber lasers (YDFL) using Mo0.5W0.5S2 polymer film and tapered fiber as the saturable absorbers (SAs). The modulation depth and saturable intensity of the film SA are 5.63% and 6.82 MW cm‑2. The shortest pulse duration and the maximum single pulse energy are 1.22 μs and 148.8 nJ for the film SA, 1.46 μs and 339 nJ for the fiber-taper SA. To the best of our knowledge, this is the first report on the Q-switched YDFL using Mo0.5W0.5S2 SAs.

  12. The new local control systems for operating gaseous diffusion plant units at Pierrelatte

    International Nuclear Information System (INIS)

    Delacroix, C.

    1990-01-01

    The development of a local control network for operating gaseous diffusion plant units is presented. The objective of the control system up date was to replace all the information network hardware. The new generation HP1000 calculators and a network architecture were chosen. The validation tests performed in laboratory and in situ, and the management policies towards the personnel during the technical changes are summarized [fr

  13. Contaminant Attenuation and Transport Characterization of 200-DV-1 Operable Unit Sediment Samples

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Szecsody, James E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Qafoku, Nikolla [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Moran, James J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lee, Brady D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Snyder, Michelle M.V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lawter, Amanda R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Resch, Charles T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gartman, Brandy N. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zhong, Lirong [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Nims, Megan K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Saunders, Danielle L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Williams, Benjamin D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Horner, Jacob A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leavy, Ian I. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Baum, Steven R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Christiansen, Beren B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Clayton, Ray E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); McElroy, Erin M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Appriou, Delphine [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tyrrell, Kimberly J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Striluk, Miranda L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-05-15

    A laboratory study was conducted to quantify contaminant attenuation processes and associated contaminant transport parameters that are needed to evaluate transport of contaminants through the vadose zone to the groundwater. The laboratory study information, in conjunction with transport analyses, can be used as input to evaluate the feasibility of Monitored Natural Attenuation and other remedies for the 200-DV-1 Operable Unit at the Hanford Site.

  14. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context.

    Science.gov (United States)

    Lopez-Iturri, Peio; Aguirre, Erik; Trigo, Jesús Daniel; Astrain, José Javier; Azpilicueta, Leyre; Serrano, Luis; Villadangos, Jesús; Falcone, Francisco

    2018-01-29

    In the context of hospital management and operation, Intensive Care Units (ICU) are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework.

  15. Stabilization of gas turbine unit power

    Science.gov (United States)

    Dolotovskii, I.; Larin, E.

    2017-11-01

    We propose a new cycle air preparation unit which helps increasing energy power of gas turbine units (GTU) operating as a part of combined cycle gas turbine (CCGT) units of thermal power stations and energy and water supply systems of industrial enterprises as well as reducing power loss of gas turbine engines of process blowers resulting from variable ambient air temperatures. Installation of GTU power stabilizer at CCGT unit with electric and thermal power of 192 and 163 MW, respectively, has resulted in reduction of produced electrical energy production costs by 2.4% and thermal energy production costs by 1.6% while capital expenditures after installation of this equipment increased insignificantly.

  16. Baseline risk assessment for the quarry residuals operable unit of the Weldon Spring Site, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. Cleanup of the site consists of several integrated components. The quarry residuals operable unit (QROU), consisting of the Weldon Spring quarry and its surrounding area, is one of four operable units being evaluated. In accordance with requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE is conducting a remedial investigation/feasibility study (RI/FS) to determine the proper response to address various contaminated media that constitute the QROU. Specifically, the operable unit consists of the following areas and media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and the bulk waste; groundwater underlying the quarry and surrounding area; and other media located in the surrounding vicinity of the quarry, including surface water and sediment at Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek. An initial evaluation of conditions at the quarry area identified remaining data requirements needed to support the conceptual site exposure and hydrogeological models. These data requirements are discussed in the RI/FS work plan issued in January 1994. Soil contamination located at a property adjacent to the quarry, referred to as Vicinity Property 9 (VP9), was originally part of the scope of the QROU, as discussed in the work plan. However, a decision was subsequently made to remediate this vicinity property as part of cleanup activities for the chemical plant operable unit, as provided for in the Record of Decision (ROD). Remediation of VP9 was completed in early 1996. Hence, this baseline risk assessment (BRA) does not address VP9.

  17. Baseline risk assessment for the quarry residuals operable unit of the Weldon Spring Site, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1998-02-01

    The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. Cleanup of the site consists of several integrated components. The quarry residuals operable unit (QROU), consisting of the Weldon Spring quarry and its surrounding area, is one of four operable units being evaluated. In accordance with requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE is conducting a remedial investigation/feasibility study (RI/FS) to determine the proper response to address various contaminated media that constitute the QROU. Specifically, the operable unit consists of the following areas and media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and the bulk waste; groundwater underlying the quarry and surrounding area; and other media located in the surrounding vicinity of the quarry, including surface water and sediment at Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek. An initial evaluation of conditions at the quarry area identified remaining data requirements needed to support the conceptual site exposure and hydrogeological models. These data requirements are discussed in the RI/FS work plan issued in January 1994. Soil contamination located at a property adjacent to the quarry, referred to as Vicinity Property 9 (VP9), was originally part of the scope of the QROU, as discussed in the work plan. However, a decision was subsequently made to remediate this vicinity property as part of cleanup activities for the chemical plant operable unit, as provided for in the Record of Decision (ROD). Remediation of VP9 was completed in early 1996. Hence, this baseline risk assessment (BRA) does not address VP9

  18. Current Conditions Risk Assessment for the 300-FF-5 Groundwater Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Miley, Terri B.; Bunn, Amoret L.; Napier, Bruce A.; Peterson, Robert E.; Becker, James M.

    2007-11-01

    This report updates a baseline risk assessment for the 300 Area prepared in 1994. The update includes consideration of changes in contaminants of interest and in the environment that have occurred during the period of interim remedial action, i.e., 1996 to the present, as well as the sub-regions, for which no initial risk assessments have been conducted. In 1996, a record of decision (ROD) stipulated interim remedial action for groundwater affected by releases from 300 Area sources, as follows: (a) continued monitoring of groundwater that is contaminated above health-based levels to ensure that concentrations continue to decrease, and (b) institutional controls to ensure that groundwater use is restricted to prevent unacceptable exposure to groundwater contamination. In 2000, the groundwater beneath the two outlying sub-regions was added to the operable unit. In 2001, the first 5-year review of the ROD found that the interim remedy and remedial action objectives were still appropriate, although the review called for additional characterization activities. This report includes a current conditions baseline ecological and human health risk assessment using maximum concentrations in the environmental media of the 300-FF-5 Operable Unit and downstream conditions at the City of Richland, Washington. The scope for this assessment includes only current measured environmental concentrations and current use scenarios. Future environmental concentrations and future land uses are not considered in this assessment.

  19. Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 120: Areas 5 and 6 Aboveground Storage Tanks, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Allison Urban

    1999-06-01

    This Closure Report provides documentation for the closure of Corrective Action Unit 120. CAU 120 consists of two Corrective Action Sites located in Areas 5 and 6 of the Nevada Test Site. CAS 05-01-01 is located in Area 5 and consists of three 45,800-liter aboveground storage tanks, piping, and debris associated with Well RNM-1. CAS 06-01-01 in Area 6 consists of two aboveground storage tanks and two tanker trailers All the CAU 120 items have been used to convey or contain radiologically contaminated fluid from post-nuclear event activities at the NTS> Closure of this CAU was completed by collecting samples to identify the appropriate method of disposal for tanks, piping, debris, and tankers in each CAS. Placing low-level radioactive waste into the appropriate containers and disposing of waste in the Area 5 Radioactive Waste Management Site, the Area 9 10C Landfill, and the Area 3 Radioactive Waste Management Site.

  20. Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 120: Areas 5 and 6 Aboveground Storage Tanks, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Allison Urban

    1999-01-01

    This Closure Report provides documentation for the closure of Corrective Action Unit 120. CAU 120 consists of two Corrective Action Sites located in Areas 5 and 6 of the Nevada Test Site. CAS 05-01-01 is located in Area 5 and consists of three 45,800-liter aboveground storage tanks, piping, and debris associated with Well RNM-1. CAS 06-01-01 in Area 6 consists of two aboveground storage tanks and two tanker trailers All the CAU 120 items have been used to convey or contain radiologically contaminated fluid from post-nuclear event activities at the NTS> Closure of this CAU was completed by collecting samples to identify the appropriate method of disposal for tanks, piping, debris, and tankers in each CAS. Placing low-level radioactive waste into the appropriate containers and disposing of waste in the Area 5 Radioactive Waste Management Site, the Area 9 10C Landfill, and the Area 3 Radioactive Waste Management Site