  1. Seismic characterization of the NPP Krsko site

    International Nuclear Information System (INIS)

    Obreza, J.

    2000-01-01

    The goal of NPP Krsko PSA Project Update was the inclusion of plant changes (i.e. configuration/operational related) through the period January 1, 1993 till the OUTAGE99 (April 1999) into the integrated Internal/External Level 1/Level 2 NPP Krsko PSA RISK SPECTRUM model. NPP Krsko is located on seismotectonic plate. Highest earthquake was recorded in 1917 with magnitude 5.8 at a distance of 7-9 km. Site (founded) on Pliocene sediments which are as deep as several hundred meters. No surface faulting at the Krsko site has been observed and thus it is not to be expected. NPP Krsko is equipped with seismic instrumentation, which allows it to complete OBE (SSE). The seismic PSA successfully showed high seismic margin at Krsko plant. NPP Krsko seismic design is based on US regulations and standards

  2. Hydrodynamics and sediment transport at Muria Peninsula NPP Site

    International Nuclear Information System (INIS)

    Heni Susiati; Berni A Subki; Harman A

    2011-01-01

    Coastal along the coast of the Muria Peninsula, particularly the location of the Muria NPP site candidate is a dynamic region, the interaction between physical oceanographic factors such as currents, waves and tides in the coastal sediments cause abrasion or accretion. Interactions have resulted in coastal dynamics needs to be considered in siting NPP is essential in order to plan. Capacity of hydro-oceanographic data is essential in order to plan the development of the Muria NPP. The process of selecting a safe site for hydro-oceanographic aspects carried out according to IAEA safety standards on site selection. For the evaluation stage of hydro oceanographic potential site (site survey stage), the analysis is more focused on the tidal along the northern coast, bathymetry, potential water resources and hydrologic systems in the Muria NPP siting locations, Jepara. The method used is a secondary, confirmation of field data collection and interpretation of modeling results. The results showed that the preparation for the construction of NPP need to be evaluated further to coastal conditions with respect to the increase coastal erosion in the area of prospective NPP siting. (author)

  3. Chernobyl NPP decommissioning efforts - Past, Present and Future. Decommissioning Efforts on Chernobyl NPP site - Past, Present

    International Nuclear Information System (INIS)

    Kuchinskiy, V.

    2017-01-01

    Two unique large-scale projects are underway at the moment within the Chernobyl - Exclusion zone - Shelter object transformation into ecologically safe system and the decommissioning of 3 Chernobyl NPP Units. As a result of beyond design accident in 1986 the entire territory of the industrial site and facilities located on it was heavily contaminated. Priority measures were carried out at the damaged Unit under very difficult conditions to reduce the accident consequences and works to ensure nuclear and radiation safety are continuous, and the Unit four in 1986 was transformed into the Shelter object. Currently, works at the Shelter object are in progress. Under assistance of the International Community new protective construction was built above the existing Shelter object - New Safe Confinement, which will ensure the SO Safety for the long term - within up to 100 years. The second major project is the simultaneous decommissioning of Chernobyl NPP Units 1, 2 and 3. Currently existing Chernobyl NPP decommissioning Strategy has been continuously improved starting from the Concept of 1992. Over the years the following was analyzed and taken into account: the results of numerous research and development works, international experience in decommissioning, IAEA recommendations, comments and suggestions from the governmental and regulatory bodies in the fields of nuclear energy use and radioactive waste management. In 2008 the final decommissioning strategy option for Chernobyl NPP was approved, that was deferred gradual dismantling (SAFSTOR). In accordance with this strategy, decommissioning will be carried out in 3 stages (Final Shutdown and Preservation, Safe Enclosure, Dismantling). The SAFSTOR strategy stipulates: -) the preservation of the reactor, the primary circuit and the reactor compartment equipment; -) the dismantling of the equipment external in relation to the reactor; -) the safe enclosure (under the supervision); -) the gradual dismantling of the primary

  4. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  5. Geological-Hydrological Site Evaluation for NPP Planning

    Energy Technology Data Exchange (ETDEWEB)

    Faust, Brigitte; Mini, Paolo [Nordostsschweizerische Kraftwerke AG NOK, Parkstrasse 23, 5401 Baden (Switzerland)

    2008-07-01

    NOK is investigating the potential replacement of the current NPP in Beznau. In order to meet the requirements with respect to a general licence application, geological, seismological, and geotechnical engineering, but also hydrological boundary conditions have been defined. These conditions define the nature of necessary investigations to obtain the geological, seismic, geotechnical and hydrological data themselves forming the basis to determine the site suitability. Viability has to be provided that a NPP can be built and operated at the proposed site without compromising public health, safety and environment. The collected data are also the basis for the design of all safety relevant structures, systems, and components. For example, the latter have to withstand the effects of natural phenomena such as earthquakes and human induced impact such as airplane crash without loosing their capability to perform the assigned safety functions. (authors)

  6. Geological-Hydrological Site Evaluation for NPP Planning

    International Nuclear Information System (INIS)

    Faust, Brigitte; Mini, Paolo

    2008-01-01

    NOK is investigating the potential replacement of the current NPP in Beznau. In order to meet the requirements with respect to a general licence application, geological, seismological, and geotechnical engineering, but also hydrological boundary conditions have been defined. These conditions define the nature of necessary investigations to obtain the geological, seismic, geotechnical and hydrological data themselves forming the basis to determine the site suitability. Viability has to be provided that a NPP can be built and operated at the proposed site without compromising public health, safety and environment. The collected data are also the basis for the design of all safety relevant structures, systems, and components. For example, the latter have to withstand the effects of natural phenomena such as earthquakes and human induced impact such as airplane crash without loosing their capability to perform the assigned safety functions. (authors)

  7. An Improved Seismic PRA Method for a Korean NPP Site

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Min Kyu; Choun, Young Sun; Choi, In Kil [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Ohtori, Yasuki [Central Research Institute of Electric Power Industry, Abiko (Japan)

    2007-07-01

    The safety of a Nuclear Power Plant (NPP) can be evaluated by the Core Damage Frequency (CDF). For the calculation of the CDF, seismic hazard evaluation results, seismic fragility analysis results and plant system information are needed. Using this information, an accident scenario through a core damage can be analyzed and finally the CDF can be determined. The well known CDF calculation program is EQESRA (1995) which was developed by EQE International INC. The EQESRA is widely used for a seismic probabilistic risk analysis (PRA) in a Korean NPP site. In this study, a new methodology for the CDF calculation was developed. For a validation about the developed method, an analysis was performed and compared to that of the previous results. Finally, the developed method was applied to the Yonggwang 5,6 unit in the case of an isolated EDG system.

  8. NPP Grassland: NPP Estimates from Biomass Dynamics for 31 Sites, 1948-1994, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set includes monthly grassland biomass data, net primary productivity (NPP) estimates, and climate (rainfall amounts and temperature) data for multiple...

  9. Environmental aspects of Greenfield NPP site in northern Finland

    International Nuclear Information System (INIS)

    Kopisto, L.

    2015-01-01

    Fennovoima will build a nuclear power plant of 1200 MW at Hanhikivi headland in Pyhaejoki, Northern Finland on the shore of the Baltic Sea. According to the target schedule the plant will produce electricity in 2024. The plant supplier is Rusatom Overseas, subsidiary of the Russian Rosatom. No industrial activity is practiced in the immediate surroundings of the site area and the headland and its surroundings are sparsely populated. The area is in its natural state. This means that all the preparatory and infrastructure works needs to be done before the construction of NPP can start. The environmental and nature conservation aspects have to be taken into consideration in planning, construction and operation of the NPP. Northern location sets some challenges to the design of the power plant. The sea area is normally covered with ice almost half of the year which has to be taken into account in the design of the power plant. But there are also advantages: in winter when the cooling water is cold the efficiency of electricity production is estimated to be exceptionally good, approximately 39 %. Since 2008, Fennovoima has carried out several environmental studies and surveys in the site area and has collected information about the nature conditions on land and in the sea area. The collected environmental data has been utilized in land use planning, environmental impact assessment procedure and in applying for conventional permits. The environmental data can also be used as baseline data. The document is composed of an abstract and the presentation slides

  10. Seismic hazard analysis of the NPP Kozloduy site

    International Nuclear Information System (INIS)

    Petrovski, D.; Stamatovska, S.; Arsovski, M.; Hadzievski, D.; Sokerova, D.; Solakov, D.; Vaptzarov, I.; Satchanski, S.

    1993-01-01

    The principal objective of this study is to define the seismic hazard for the NPP Kozloduy site. Seismic hazard is by rule defined by the probability distribution function of the peak value of the chosen ground motion parameter in a defined time interval. The overall study methodology consists of reviewing the existing geological, seismological and tectonic information to formulate this information into a mathematical model of seismic activity of the region and using this assess earthquake ground motion in terms of probability. Detailed regional and local seismological investigations have been performed. Regional investigations encompass the area within a radius of 320 km from the NPP Kozloduy site. The results of these investigations include all seismological parameters that are necessary for determination of the mathematical model of the seismicity of the region needed for the seismic hazard analysis. Regional geological and neotectonic investigations were also performed for the wider area including almost the whole territory of Bulgaria, a large part of Serbia, part of Macedonia and almost the whole south part of Romania

  11. Standard protocol for evaluation of environmental transfer factors around NPP sites

    International Nuclear Information System (INIS)

    Hegde, A.G.; Verma, P.C.; Rao, D.D.

    2009-01-01

    This document presents the standard procedures for evaluation of site specific environmental transfer factors around NPP sites. The scope of this document is to provide standard protocol to be followed for evaluation of environmental transfer factors around NPP sites. The studies on transfer factors are being carried out at various NPP sites under DAE-BRNS projects for evaluation of site specific transfer factors for radionuclides released from power plants. This document contains a common methodology in terms of sampling, processing, measurements and analysis of elemental/radionuclides, while keeping the site specific requirements also in place. (author)

  12. Preliminary evaluation of the seismic hazard at Cernavoda NPP site

    International Nuclear Information System (INIS)

    Mingiuc, C.; Serban, V.; Androne, M.

    2001-01-01

    The probabilistic seismic hazard analysis (PSHA) is a methodology by which one evaluates the probability of exceeding different parameters of the ground motions (the maximum ground acceleration - PGA and the ground response spectrum - SA) as effect of the seismic action, on a given site at a future time moment. Due to the large uncertainties in the geological, geophysical, seismological input data, as well as, in the models utilised, various interpretation schemes are applied in the PSHA analyses. This interpretation schemes lead to opinion discrepancies among specialists which finally lead to disagreements in estimating the values of the seismic design for a given site. In order to re-evaluate the methodology and to improve the PSHA result stability, U.S. Nuclear Regulatory Commission (NRC), U.S. Department of Energy (DOE) and Electric Power Research Institute (EPRI) sponsored a project for defining methodological guides of performing PSHA analyses. The project was implemented by a panel of 7 experts, the Senior Seismic Hazard Analysis Committee - SSHAC. This paper presents a preliminary evaluation of the seismic hazard for the Cernavoda NPP site by application of the methodology mentioned, by taking into account the possible sources which could affect the site (the Vrancea focus, Galati - Tulcea fault, Sabla - Dulovo fault and local earthquakes)

  13. NPP Multi-Biome: Summary Data from Intensive Studies at 125 Sites, 1936-2006

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set, NPP Multi-Biome: Summary Data from Intensive Studies at 125 Sites, 1936-2006, contains a single shapefile that provides site-level summary statistics...

  14. BigFoot NPP Surfaces for North and South American Sites, 2000-2004

    Data.gov (United States)

    National Aeronautics and Space Administration — The BigFoot project gathered Net Primary Production (NPP) data for nine EOS Land Validation Sites located from Alaska to Brazil from 2000 to 2004. Each site is...

  15. Design of NPP of new generation being constructed at the Novovoronezh NPP site

    International Nuclear Information System (INIS)

    Afrov, A.; Berkovich, V.; Generalov, V.; Dragunov, Yu.; Krushelnitsky, V.

    1999-01-01

    The design of a new generation NPP is described, underscoring advances in physical attributes and passive safety systems based on experiences with earlier designs at operating NPPs. This paper elaborates on systems for handling and storing radioactive wastes, on refinements in containment measures and on experimental and analytic validation of critical design factors. (author)

  16. BigFoot NPP Surfaces for North and South American Sites, 2000-2004

    Data.gov (United States)

    National Aeronautics and Space Administration — ABSTRACT: The BigFoot project gathered Net Primary Production (NPP) data for nine EOS Land Validation Sites located from Alaska to Brazil from 2000 to 2004. Each...

  17. NPP Temperate Forest: OTTER Project Sites, Oregon, USA, 1989-1991, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides net primary productivity (NPP) estimates and associated field measurements for six sites located along the 250-km, west-east transect of the...

  18. Remote technology in RBMK-1000 spent fuel management at NPP site

    International Nuclear Information System (INIS)

    Makarchuk, T.F.; Kozlov, Y.V.; Tikhonov, N.S.; Tokarenko, A.I.; Spichev, V.V.; Kaljazin, N.N.

    1999-01-01

    The report describes the remote technologies employed in the nuclear power plant with RBMK-1000 type. Spent fuel transfer and handling operations at reactor (AR) and away from reactor (AFR) on reactor site (RS) facilities are illustrated by the example of the Leningradskaya NPP and are typical for all NPPs with RBMK-1000. The current approach to spent fuel management at NPP sites is also presented. (author)

  19. System for ecological monitoring and assessment for NPP site environment

    International Nuclear Information System (INIS)

    Vorob'ev, E.I.; Olejnikov, N.F.; Reznichenko, V.Yu.

    1987-01-01

    On the basis of the Leningrad NPP named after V.I. Lenin the development of a system for ecological monitoring and assessment (EMA) of the environment state and health of personnel and population has started in the EMA program framework. The program of ecological monitoring and assessment coordinates the works on the study of NPP effect on the nature and people, effect of separate factors and their combination, methods and models for the description of the effects, forecasting and evaluation, selection of the optimal protection strategies. Scientific foundations, structure and content of the EMA program are given to coordinate the works carried out according to the program with other works carried out in the country in this direction. The paper deals with the composition of monitoring parameters of the standard system of ecological monitoring of the environment for NPP

  20. Results on improved environmental monitoring at the Ignalina NPP site

    International Nuclear Information System (INIS)

    Gudelis, A.; Remeikis, V.; Gubachev, I.; Batalin, J.

    2002-01-01

    Within the IAEA TC Project 'Radioecology in the vicinity of the Ignalina NPP' (LIT/9/003) a high efficiency HPGe well-type detector was obtained in 1998 for the investigations in environmental radioactivity in Lithuania. Efficiency calibration for this detector was done in the energy range 122-1461 keV by using reference standard solution with single-photon emitting radionuclides. At the same time, the coincidence-summing correction factor was experimentally determined for 60 Co. Earlier investigations carried out in moss samples in 1996 have shown that the site-specific radionuclide 60 Co was distributed on the ground mainly in the area of radius of 5-7 km from the source, and the maximum activity concentration on the earth surface was found to be 22 Bq/m 2 . However, only natural 7 Be and globally distributed 137 Cs were permanently measured in aerosol filter samples taken at 7 Ignalina NPP (INPP) monitoring stations, before the introduction of efficient HPGe well-type detector. Normally, the aerosol filters have been pressed into tablets and counted on the end cap of the Ge(Li)-detector that had relatively high MDA value (of the order of 0.5 Bq per sample for 137 Cs). It was, therefore, expected that the use of 4π geometry attainable inside a well would considerably improve the detection probability for 60 Co and other artificial radionuclides of the INPP origin. In order to prepare the aerosol filter samples for counting in new geometry they had to be ashed at 450 deg C. The final volume of ash samples was close to 2 cm 3 , and this amount could be easily fit into well that could accommodate samples of up to 4 cm 3 . For this geometry, the MDA values for 60 Co and 137 Cs were determined as 20 mBq and 12 mBq, respectively, when counting time was set to 100,000 s. After the remeasuring the aerosol filter samples in high-efficiency geometry a number of samples revealed the content of activation products 54 Mn and 60 Co that were not detected when Ge

  1. Seismic site evaluation practice and seismic design guide for NPP in Continent of China

    Energy Technology Data Exchange (ETDEWEB)

    Hu Yuxian [State Seismological Bureau, Beijing, BJ (China). Inst. of Geophysics

    1997-03-01

    Energy resources, seismicity, NPP and related regulations of the Continent of China are briefly introduced in the beginning and two codes related to the seismic design of NPP, one on siting and another on design, are discussed in some detail. The one on siting is an official code of the State Seismological Bureau, which specifies the seismic safety evaluation requirements of various kinds of structures, from the most critic and important structures such as NPP to ordinary buildings, and including also engineering works in big cities. The one on seismic design of NPP is a draft subjected to publication now, which will be an official national code. The first one is somewhat unique but the second one is quite similar to those in the world. (author)

  2. Preliminary site investigation for LL and IL radwaste disposal for Qinshan NPP

    International Nuclear Information System (INIS)

    Huang Yawen; Chen Zhangru

    1993-01-01

    With the purpose of selecting a disposal site for the low- and intermediate-level radwastes arising from Qinshan NPP, site investigations were carried out in several districts of Zhejiang Province. Investigation objectives included the circumstances of geology, hydrogeology, environmental ecology, and social economy. On the basis of collected data, five possible sites were recommended for policy-making reference and further investigation

  3. Development of Tsunami PSA method for Korean NPP site

    International Nuclear Information System (INIS)

    Kim, Min Kyu; Choi, In Kil; Park, Jin Hee

    2010-01-01

    A methodology of tsunami PSA was developed in this study. A tsunami PSA consists of tsunami hazard analysis, tsunami fragility analysis and system analysis. In the case of tsunami hazard analysis, evaluation of tsunami return period is major task. For the evaluation of tsunami return period, numerical analysis and empirical method can be applied. The application of this method was applied to a nuclear power plant, Ulchin 56 NPP, which is located in the east coast of Korean peninsula. Through this study, whole tsunami PSA working procedure was established and example calculation was performed for one of real nuclear power plant in Korea

  4. An Extreme Meteorological Events Analysis For Nuclear Power Plant (NPP) Siting Project at Bangka Island, Indonesia

    Science.gov (United States)

    Septiadi, Deni; S, Yarianto Sugeng B.; Sriyana; Anzhar, Kurnia; Suntoko, Hadi

    2018-03-01

    The potential sources of meteorological phenomena in Nuclear Power Plant (NPP) area of interest are identified and the extreme values of the possible resulting hazards associated which such phenomena are evaluated to derive the appropriate design bases for the NPP. The appropriate design bases shall be determined according to the Nuclear Energy Regulatory Agency (Bapeten) applicable regulations, which presently do not indicate quantitative criteria for purposes of determining the design bases for meteorological hazards. These meteorological investigations are also carried out to evaluate the regional and site specific meteorological parameters which affect the transport and dispersion of radioactive effluents on the environment of the region around the NPP site. The meteorological hazards are to be monitored and assessed periodically over the lifetime of the plant to ensure that consistency with the design assumptions is maintained throughout the full lifetime of the facility.

  5. Determination of potential NPP site with GIS in the coastal Provinces West Kalimantan

    International Nuclear Information System (INIS)

    Heni Susiati

    2014-01-01

    The IAEA has published the IAEA Safety Guide NS-R-3 and BAPETEN has issued the Chairman Decree (Perka BAPETEN No. 5, 2007) on site evaluation for NPP to ensure safe and secure operation of NPP’s that will be built. In relation with a preparatory program of NPP in Kalimantan Barat, BATAN conducted site survey along the coastal area of Ketapang and Kayong Utara, Kalimantan Barat. This study is aimed to get potential sites along the coastal area of Ketapang and Kayong Utara based on weighting of criteria and spatial modeling and GIS. Determination of potential site is done based on following criteria: slope, lithology, geology, topography, rainfall, hazard vulnerability, proximity to water bodies, distance of residential areas, land use, peat existence, hydrogeology, etc. Based on weighting and scoring, the study identified 4 potential sites on the coastal area of Kendawangan, Sukadana, Matan Hilir Utara and Matan Hilir Selatan. (author)

  6. Design of NPP of new generation being constructed at Novovoronezh NPP site

    International Nuclear Information System (INIS)

    Afrov, A.; Berkovich, V.; Generalov, V.; Dragunov, Yu.; Krushelnitskij, V.

    2000-01-01

    The design of a new-generation nuclear power plant with advanced WWER-1000 units, currently under construction at Novovoronezh, is dealt with in considerable detail. Information is given on the general layout of the power plant, and the monoblock comprising the four-loop reactor plant with double containment, the turbine hall with two turbine-driven feedwater pumps and safety and auxiliary systems is described. In a separate building at the power plant site, a new fuel storage facility is located designed for extreme external effects. The operations involved in fuel handling, in both the storage facility and the reactor department, are mentioned. The management of various types of radioactive waste is highlighted. The basic principles of the engineering solutions pertaining to the plant's electrical part are outlined. The concept of the instrumentation and control system is explained. Information is also given on the double containment system. A considerable part of the presentation is devoted to the philosophy and concept of the power plant safety, to the results of safety evaluation and to the research carried out in this respect. The paper is concluded with a discussion of the experiments and analyses performed with the aim to justify the design solutions as regards the passive heat removal system. (A.K.)

  7. Identification of flora and fauna biodiversity at Berau, East Kalimantan in NPP pre site survey

    International Nuclear Information System (INIS)

    June Mellawati; Fepriadi; Yarianto; Tajudin Laddade

    2010-01-01

    In pre survey activity of NPP site candidate, environmental aspect is a part of non safety aspect, but the existence as an important area is needed to consider. Pre survey activity of NPP site at Berau East Kalimantan is done for follow up result of agreement of Governor in Kalimantan. Purpose of study is to identify fauna and flora biodiversity in Berau Kalalimantn Timur to complete the data base of environmental aspect at survey activity of NPP site candidate The method used is to conduct an inventory and identification of flora-fauna through secondary data collection, making zoning area based on the type of endangered species, and analyze and evaluate the suitability. The survey location priority the coast area such as Sambaliung District, Derawan, Maratua, Tabalar, Biatan-Lempake, Talisayan, Batu Putih and Biduk-Biduk District, Berau Regency, East Kalimantan Province. Activity is done at June 2008 - June 2009. The results showed that there were various species of flora and fauna that are categorized protected under Law Decree no. 5 of 1990 in the study location. However, some areas such as Tanjung Pandan, Tanjung Bohe northern, southern of Tanjung Ulingan, District Derawan Island, and Batu Putih Talisayan District, and Teluk Sulaiman, Biduk-Biduk District need further study and consideration for zoning interest in nuclear power plants because they meet the existing criteria. (author)

  8. Hydrodynamic models of the possibility of flooding Zaporizhya NPP site beyond the extreme earthquakes and hurricanes

    International Nuclear Information System (INIS)

    Skalozubov, V.I.; Gablaya, T.V.; Vashchenko, V.N.; Gerasimenko, T.V.; Kozlov, I.L.

    2014-01-01

    We propose a hydrodynamic model of possible flooding of the industrial site at Zaporozh'e NPP design basis earthquakes and hurricane. In contrast to the quasi-stationary approach of stress tests in the proposed model takes into account the dynamic nature of the processes of flooding, as well as a direct impact of external influences on extreme Kakhovske reservoir. As a result of hydrodynamic modeling, the possible conditions and criteria for the flooding of the industrial site at Zaporozhe extreme external influences

  9. Radioactive dispersion analysis for hypothetical nuclear power plant (NPP) candidate site in Perak state, Malaysia

    Science.gov (United States)

    Shamsuddin, Shazmeen Daniar; Basri, Nor Afifah; Omar, Nurlyana; Koh, Meng-Hock; Ramli, Ahmad Termizi; Saridan Wan Hassan, Wan Muhamad

    2017-10-01

    Malaysia is planning to build a nuclear power plant (NPP) by 2030 to diversify the national electricity supply and resources. Selection of an NPP site must consider various factors, especially nuclear safety consideration to fulfil the nuclear safety objectives. Environmental Risk Assessment Analysis is a part of safety requirements by the International Atomic Energy Agency (IAEA) prior to the NPP commissioning process. Risk Assessments Analysis (RIA) is compulsory for the NPP site evaluation. One of RIA methods are Radioactive Dispersion Analysis using probabilistic risk analysis software. It is also important to perform studies to estimate the impact to the neighbouring population in the case of a nuclear accident at the power plant. In the present work, aimed to study the impact of a hypothetical nuclear accident by simulating the dispersion pattern of radionuclides originated from a candidate site at Manjung, Perak. The work has been performed using the HotSpot Health Physics codes. Two types of radionuclides have been considered namely 137Cs and 131I. In calculations, the initial concentration of radioactive materials of Fukushima Daiichi accident data are used which are 2.06 x 1016 Bq and 1.68 x 1017 Bq respectively for the two radionuclides. The result shows that the dispersion distance obtained from both software are not the same. It shows that 137Cs and 131I can be dispersed as far as 16 km and 80 km away from the site during radiological accident respectively, reaching major towns in Perak. Using HOTSPOT, the estimated total effective dose equivalent (TEDE) for 137Cs and 131I at major towns in Perak such as Lumut and Sitiawan are 1.2 mSv and 9.9 mSv. As for Taiping, Ipoh, Kampar, and Teluk Intan the estimated TEDE is around 0.2 mSv and 1.6 mSv respectively. In conclusion, the dispersion can reach as far as 80 km from the site. However, estimated annual effective dose is not more than 1 mSv limit, which is considered acceptable in the point of view of

  10. Radioactive dispersion analysis for hypothetical nuclear power plant (NPP candidate site in Perak state, Malaysia

    Directory of Open Access Journals (Sweden)

    Shamsuddin Shazmeen Daniar

    2017-01-01

    Full Text Available Malaysia is planning to build a nuclear power plant (NPP by 2030 to diversify the national electricity supply and resources. Selection of an NPP site must consider various factors, especially nuclear safety consideration to fulfil the nuclear safety objectives. Environmental Risk Assessment Analysis is a part of safety requirements by the International Atomic Energy Agency (IAEA prior to the NPP commissioning process. Risk Assessments Analysis (RIA is compulsory for the NPP site evaluation. One of RIA methods are Radioactive Dispersion Analysis using probabilistic risk analysis software. It is also important to perform studies to estimate the impact to the neighbouring population in the case of a nuclear accident at the power plant. In the present work, aimed to study the impact of a hypothetical nuclear accident by simulating the dispersion pattern of radionuclides originated from a candidate site at Manjung, Perak. The work has been performed using the HotSpot Health Physics codes. Two types of radionuclides have been considered namely 137Cs and 131I. In calculations, the initial concentration of radioactive materials of Fukushima Daiichi accident data are used which are 2.06 x 1016 Bq and 1.68 x 1017 Bq respectively for the two radionuclides. The result shows that the dispersion distance obtained from both software are not the same. It shows that 137Cs and 131I can be dispersed as far as 16 km and 80 km away from the site during radiological accident respectively, reaching major towns in Perak. Using HOTSPOT, the estimated total effective dose equivalent (TEDE for 137Cs and 131I at major towns in Perak such as Lumut and Sitiawan are 1.2 mSv and 9.9 mSv. As for Taiping, Ipoh, Kampar, and Teluk Intan the estimated TEDE is around 0.2 mSv and 1.6 mSv respectively. In conclusion, the dispersion can reach as far as 80 km from the site. However, estimated annual effective dose is not more than 1 mSv limit, which is considered acceptable in the point

  11. Selection Methodology Approach to Preferable and Alternative Sites for the First NPP Project in Yemen

    Energy Technology Data Exchange (ETDEWEB)

    Kassim, Moath [Kyunghe Univ., Yongin (Korea, Republic of); Kessel, David S. [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-05-15

    The purpose of this paper is to briefly present the methodology and results of the first siting study for the first nuclear power plant (NPP) in Yemen. In this study it has been demonstrated that there are suitable sites for specific unit/units power of 1000 MWt (about 300 MWe) nuclear power plant. To perform the site selection, a systematic selection method was developed. The method uses site-specific data gathered by literature review and expert judgement to identify the most important site selection criteria. A two-step site selection process was used. Candidate sites were chosen that meet a subset of the selection criteria that form the most important system constraints. These candidate sites were then evaluated against the full set of selection criteria using the Analytical Hierarchy Process Method (AHP). Candidate sites underwent a set of more specific siting criteria weighted by expert judgment to select preferable sites and alternatives using AHP method again. Expert Judgment method was used to rank and weight the importance of each criteria, then AHP method used to evaluate and weight the relation between criterion to criterion and between all criteria against the global weight. Then logical decision software was used to rank sites upon their weighting value.

  12. Selection Methodology Approach to Preferable and Alternative Sites for the First NPP Project in Yemen

    International Nuclear Information System (INIS)

    Kassim, Moath; Kessel, David S.

    2015-01-01

    The purpose of this paper is to briefly present the methodology and results of the first siting study for the first nuclear power plant (NPP) in Yemen. In this study it has been demonstrated that there are suitable sites for specific unit/units power of 1000 MWt (about 300 MWe) nuclear power plant. To perform the site selection, a systematic selection method was developed. The method uses site-specific data gathered by literature review and expert judgement to identify the most important site selection criteria. A two-step site selection process was used. Candidate sites were chosen that meet a subset of the selection criteria that form the most important system constraints. These candidate sites were then evaluated against the full set of selection criteria using the Analytical Hierarchy Process Method (AHP). Candidate sites underwent a set of more specific siting criteria weighted by expert judgment to select preferable sites and alternatives using AHP method again. Expert Judgment method was used to rank and weight the importance of each criteria, then AHP method used to evaluate and weight the relation between criterion to criterion and between all criteria against the global weight. Then logical decision software was used to rank sites upon their weighting value

  13. Radionuclide Distribution in the Soil on the Stabatishkes Site in the Vicinity of the Ignalina NPP

    Directory of Open Access Journals (Sweden)

    Jevgenij Aliončik

    2011-02-01

    Full Text Available A near surface repository for low and intermediate-level short-lived radioactive waste will be built on the Stabatiškės site in the vicinity of Ignalina NPP during decommissioning works. The reservoir can also be used for the waste stored in the temporary repositories of the Ignalina NPP. Engineering and nature protective barriers are used in the repository for radioactive waste, however, radionuclides can spread into the environment, extend in the biosphere and cause (define the external power light exposure of the environment due to the natural and premature (prescheduled degradation of the engineering barriers of the repository. The properties of the soil (acidity, quantity of organic substances, humidity are being investigated for estimating the possible migration and dispersion of radionuclides. The activity of radionuclides in the soil is also estimated before building the repository. Natural and artificial radionuclides make the pollution of the soil, and therefore the accumulation and vertical migration of artificial (137Cs, 60Co and natural (226Ra, 232Th, 40K radionuclides are being researched in the soil on the Stabatiškės site.Article in Lithuanian

  14. NPP Boreal Forest: Consistent Worldwide Site Estimates, 1965-1995, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — ABSTRACT: This data set provides estimates of above- and below-ground biomass, above- and below-ground NPP (ANPP and BNPP), and total NPP(TNPP) for selected North...

  15. NPP Boreal Forest: Consistent Worldwide Site Estimates, 1965-1995, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides estimates of above- and below-ground biomass, above- and below-ground NPP (ANPP and BNPP), and total NPP(TNPP) for selected North American and...

  16. Site ultrasonic measurement on RPV stud-bolt loading under hot transient of Qinshan NPP

    International Nuclear Information System (INIS)

    Qu Jiadi; Dou Yikang; Zhu Shiming

    1994-08-01

    It expounds that the key of solving thermal transient sealing problem is to obtain the thermal increment of stud-bolt loading. This loading, as a primary stress loading, is directly related to the bolt fatigue life and transient loading spectrum for vessel analysis. The fundamental works and main results of ultrasonic measurement on RPV stud-bolt loading on Qinshan site are also presented. The measuring capability has exceeded 1 m in length and temperature of 280 degree C, therefore, it is possible to be used in the field of NPP. The paper is the continuation of research work for sealing analysis and tests on the RPV (see SMiRT-9, 10)

  17. Towards the Seismic Hazard Reassessment of Paks NPP (Hungary) Site: Seismicity and Sensitivity Studies

    Science.gov (United States)

    Toth, Laszlo; Monus, Peter; Gyori, Erzsebet; Grenerczy, Gyula; Janos Katona, Tamas; Kiszely, Marta

    2015-04-01

    In context of extension of Paks Nuclear Power Plant by new units, a comprehensive site seismic hazard evaluation program has been developed that is already approved by the Hungarian Authorities. This includes a 3D seismic survey, drilling of several deep boreholes, extensive geological mapping, and geophysical investigations at the site and its vicinity, as well as on near regional, and regional scale. Furthermore, all relevant techniques of modern space geodesy (GPS, PSInSAR) will be also utilized to construct a new seismotectonic model. The implementation of the project is still in progress. In the presentation, some important elements of the new seismic hazard assessment are highlighted, and some results obtained in the preliminary phase of the program are presented and discussed. The first and most important component of the program is the compilation of the seismological database that is developed on different time scale zooming on different event recurrence rates such as paleo-earthquakes (10-1/a). In 1995, Paks NPP installed and started to operate a sensitive microseismic monitoring network capable for locating earthquakes as small as magnitude 2.0 within about 100 km of the NPP site. During the two decades of operation, the microseismic monitoring network located some 2,000 earthquakes within the region of latitude 45.5 - 49 N and longitude 16 - 23 E. Out of the total number of events, 130 earthquakes were reported as 'felt events'. The largest earthquake was an event of ML 4.8, causing significant damage in the epicenter area. The results of microseismic monitoring provide valuable data for seismotectonic modelling and results in more accurate earthquake recurrence equations. The first modern PSHA of Paks NPP site was carried out in 1995. Complex site characterization project was implemented and hazard curves had been evaluated for 10-3 - 10-5 annual frequency. As a follow-up, PSHA results have been reviewed and updated in the frame of periodic safety

  18. NPP Siting in Western Part of Java Island Indonesia: Regional Analysis Stage

    International Nuclear Information System (INIS)

    Sastratenaya, A.S.; Yuliastuti

    2011-01-01

    Full text of publication follows: Considering that Banten and West Java Provinces are dense regions of industry, therefore they require a large amount of electricity. Nuclear power plant is one option to be considered to anticipate the future electricity demand. To support the program, it is needed to look for some potential locations through NPP siting. The siting should meet the requirement of safety, safety aspects of the natural external events, human induced external events, public and environmental safety. Site selection is performed in several stages, where each stage has specific assessment criteria. Siting is commenced with pre-survey activity to obtain several interest areas, the activity covers a wide area but the used data is very limited and only apply general criteria. The following activities after pre survey are site survey consisting of (1) regional analysis, (2) site screening, and (3) comparison and ranking stages. The objective of regional analysis is to obtain potential sites in the study area of 150 km radius from each interest area by using both general and specific criteria. The potential sites then screened to obtain selected candidate sites by using more detailed secondary data as well as survey activities such as geophysical investigation, a few of drilling, etc., within the radius of 50 km from each potential site. All the selected candidate sites are then compared and ranked to obtain preferred candidate site. Site evaluation is the next step to evaluate all site-specific parameter to obtain design basis parameters and as the basis for preparing site permit document. This paper presents the methodology and result of regional analysis stage. The objective of the activity is to obtain potential sites in the north coast of West Java and Banten Provinces by considering fourteen study aspects which could be categorize into safety related aspects, non-safety related aspect and public education. However, this paper only considers the safety

  19. Existing Condition of Plankton in the Water Body of Muria NPP Site

    International Nuclear Information System (INIS)

    Norma-Afiati; Yarianto-S-Budi-Susilo; Mauritz-L- Tobing; Heni-Susiati

    2007-01-01

    NPP development project is predicted have a potential impact to the water ecosystem. The source of impact is the activities at the both construction and operation stage. The scale of impact will be depending on the existing condition compared to the environmental condition changes after the project activity. Plankton is the organisms that have the significant role in terms of food chain and they are sensitive to the environmental change. Phytoplankton is the food producer in the water ecosystem; meanwhile zooplankton is the first level of consumer. The method used in this work was random sampling. Plankton sampling was using plankton net. Identification for micro-organism used microscope, while for larger organism used binocular. Calculation of abundance and species diversity index used Shannon formula. The result showed that in the vicinity of Ujung Lemahabang Site was found about 23 species of phytoplankton; number of marine phytoplankton was more than that of the fresh water ecosystem, trend of zooplankton population follows phytoplankton trend. (author)

  20. NPP Multi-Biome: Grassland, Boreal Forest, and Tropical Forest Sites, 1939-1996, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set contains one data file (.csv format) that provides net primary productivity (NPP) estimates for 34 grasslands, 14 tropical forests, and 5 boreal forest...

  1. NPP Multi-Biome: Grassland, Boreal Forest, and Tropical Forest Sites, 1939-1996, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — ABSTRACT: This data set contains one data file (.csv format) that provides net primary productivity (NPP) estimates for 34 grasslands, 14 tropical forests, and 5...

  2. NPP Tropical Forest: Consistent Worldwide Site Estimates, 1967-1999, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set contains documented field measurements of NPP components for 39 old-growth tropical forests distributed worldwide between latitudes 23.58 N and 23.58...

  3. Experience from the transportation of irradiated WWER-440 fuel assemblies at the Kozloduy NPP site after a short cooling time

    International Nuclear Information System (INIS)

    Stoyanova, I.; Kamenov, A.; Byrzev, L.; Christoskov, I.

    2003-01-01

    Results from the analysis and experimental verification of the radiation and shielding characteristics of non-standard loading patterns of the VSPOT transport cask used for transportation of irradiated fuel assemblies after a short cooling time (120 180 days) on the site of the Kozloduy NPP are presented. An additional safety criterion related to the introduced modifications to the standard procedure of using the transport cask is formulated and discussed (Authors)

  4. Optimal organization of structural analysis and site inspection for the seismic requalification of Paks NPP

    International Nuclear Information System (INIS)

    Contri, P.

    1996-01-01

    The analysis described in this report deals with a numerical procedure aimed for the assessment of a methodology for the optimal organization of data collection, in the context of seismic requalification of structures and components of existing nuclear power plants. The presented procedure has quite a general application and an example was chosen for the Paks NPP where seismic requalification is in progress. The assessment was carried out in reference to the following main tasks: structure and soil data analysis; numerical model generation; deterministic dynamic analysis description; reliability analysis framework discussion; transfer function calculation via response surface approach; and the sensitivity evaluation

  5. A tsunami PSA methodology and application for NPP site in Korea

    International Nuclear Information System (INIS)

    Kim, Min Kyu; Choi, In-Kil

    2012-01-01

    Highlights: ► A methodology of tsunami PSA was developed in this study. ► Tsunami return period was evaluated by empirical method using historical tsunami record and tidal gauge record. ► Procedure of tsunami fragility analysis was established and target equipments and structures for investigation of tsunami fragility assessment were selected. ► A sample fragility calculation was performed for the equipment in Nuclear Power Plant. ► Accident sequence of tsunami event is developed by according to the tsunami run-up and draw down, and tsunami induced core damage frequency (CDF) is determined. - Abstract: A methodology of tsunami PSA was developed in this study. A tsunami PSA consists of tsunami hazard analysis, tsunami fragility analysis and system analysis. In the case of tsunami hazard analysis, evaluation of tsunami return period is a major task. For the evaluation of tsunami return period, numerical analysis and empirical method can be applied. In this study, tsunami return period was evaluated by empirical method using historical tsunami record and tidal gauge record. For the performing a tsunami fragility analysis, procedure of tsunami fragility analysis was established and target equipments and structures for investigation of tsunami fragility assessment were selected. A sample fragility calculation was performed for the equipment in Nuclear Power Plant. In the case of system analysis, accident sequence of tsunami event is developed by according to the tsunami run-up and draw down, and tsunami induced core damage frequency (CDF) is determined. For the application to the real Nuclear Power Plant, the Ulchin 56 NPP which located in east coast of Korean peninsula was selected. Through this study, whole tsunami PSA working procedure was established and example calculation was performed for one of real Nuclear Power Plant in Korea. But for more accurate tsunami PSA result, there are many researches needed for evaluation of hydrodynamic force, effect of

  6. Issues on safe radioactive waste management at ChNPP site in International Shelter Implementation Plan

    International Nuclear Information System (INIS)

    Bykov, V.; Kilochytska, T.; Gromyko, S.; Kadkin, Y.; Kondratiev, S.; Pavlenko, A.; Bogorinski, P.

    2003-01-01

    The International Shelter Implementation Plan (SIP) [1], is aimed to convert the ChNPP unit 4, destroyed by a beyond-design accident in 1986, into an environmentally safe facility by means of large-scale projects such as stabilization of the existing Sarcophagus (Shelter), construction of a New Safe Confinement (NSC), and installation of engineering and monitoring systems. This report presents some important safety issues concerning radioactive waste (RAW) management at the Shelter. One of the main problems of RAW management is to dispose of large volumes of RAW generated during ground preparation work. It is necessary that RAW be sorted carefully to separate low-active radioactive waste (LLW), which will be the majority, from high-level waste. Considering the fact that the Shelter is in the exclusion zone, the interim storage of LLW in this zone is possible, but a set of safety measures is required, e.g. prevention of dust generation or spreading of radioactivity with water. Another problem is high level RAW management. Highly radioactive fragments of the core, including fuel were ejected during the accident and are now buried under the man-made layer around the Shelter. Unanticipated disclosure of such fragments may happen during any ground preparation work as well as during clearing of premises inside the damaged buildings. Therefore, permanent radiation monitoring is required to prevent any intolerable exposure of workers. Unanticipated disclosure of high-active radioactive waste (HLW) could lead to considerable delay of any work. Since it is particularly difficult to remove HLW from those locations, which can not be easily accessed with removal equipment, such waste needs to be confined and properly shielded at in situ. Due to absence of a permanent HLW storage, an interim storage needs to be provided for in the territory of the Sarcophagus. (author)

  7. Safety assessment of multi-unit NPP sites subject to external events

    International Nuclear Information System (INIS)

    Samaddar, Sujit; Hibino, Kenta; Coman, Ovidiu

    2014-01-01

    This paper presents a framework for conducting a probabilistic safety assessment of multi-unit sites against external events. The treatment of multiple hazard on a unit, interaction between units, implementation of severe accident measures, human reliability, environmental conditions, metric of risk for both reactor and non-reactor sources, integration of risk and responses and many such important factors need to be addressed within the context of this framework. The framework facilitates the establishment of a comprehensive methodology that can be applied internationally to the peer review of safety assessment of multi-unit sites under the impact of multiple external hazards. In summary, it can be said that the site safety assessment for a multi-unit site will be quite complex and need to start with individual unit risk assessments, these need to be combined considering the interactions between units and their responses, and the fragilities of the installations established considering the combined demands from all interactions. Using newly established risk metric the risk can then be integrated for the overall site. Fig. 2 shows schematically such a proposal. Much work has to done and the IAEA has established a working group that is systematically establishing the structure and process to incorporate the many issues that are a part of a multi-unit site safety assessment. (authors)

  8. End of mission report on seismic safety review mission for Belene NPP site

    International Nuclear Information System (INIS)

    Gurpinar, A.; Mohammadioun, B.; Schneider, H.; Serva, L.

    1995-01-01

    Upon the invitation of the Bulgarian government through the Committee for the Peaceful Uses of Atomic Energy and within the framework of the implementation of the Technical Cooperation project BUL/9/012 related to site and seismic of NPPs, a mission visited Sofia 3 - 7 July 1995. The mission constituted a follow-up of the interim review of subjects related to tectonic stability and seismic hazard characterization of the site which was performed in September 1993. The main objective of the mission was the final review of the subjects already reviewed in September 1993 as well as issues related to geotechnical engineering and foundation safety. The main terms of reference of the present mission was to verify the implementation of the recommendations of the Site Safety Review Mission of June 1990. This document gives findings on geology-tectonics, seismology and foundation safety. In the end conclusions and recommendations of the mission are presented

  9. Technical assessment concept of geological aspect to define site NPP prospectus in Indonesia

    International Nuclear Information System (INIS)

    Akhmad Muktaf Haifani

    2013-01-01

    Geological aspects become an important aspect in determining the prospective nuclear power plant site. Geological investigation can be categorized based on the spatial scale of Regional and Local and every stage will have different levels of investigation. Understanding Regional Tectonics and Regional Geology of Indonesia is very important and helps to facilitate the evaluators to review documents. Unification of standard of site conformity assessment in terms tectonic aspect particularly geological stability becomes very necessary in the assessment of the suitability of the proposed licensed document, given the tectonic-forming process in Indonesia is highly variable. Safety criteria is key parameters that must be considered to solve any problems and a proper bridge in determining the site parameters of the proposed by applicants and compliance with any requirement of Regulatory Body. (author)

  10. Application of GIS in prediction and assessment system of off-site accident consequence for NPP

    International Nuclear Information System (INIS)

    Wang Xingyu; Shi Zhongqi

    2002-01-01

    The assessment and prediction software system of off-site accident consequence for Guangdong Nuclear Power Plant (GNARD2.0) is a GIS-based software system. The spatial analysis of radioactive materials and doses with geographic information is available in this system. The structure and functions of the GNARD system and the method of applying ArcView GIS are presented

  11. Assessment of Muria geochemistry evolution and related to volcanic hazard to NPP site at Muria

    International Nuclear Information System (INIS)

    Basuki Wibowo; June Mellawati; Heni Susiati

    2011-01-01

    Study of geochemistry evolution aspect in Mt. Muria cycle to predict the level of volcanic hazards posed in the future on Muria nuclear power plant site was conducted. The purpose of the study was to determine the Muria geochemistry condition, tectonic patterns and to predict the level of volcanic hazard in the future on Muria nuclear power plant sites. The methodology used is the collection of secondary data on the complex geochemical conditions Muria volcanic in their life cycle, perform correlation geochemical cycle in its path towards conditions that most likely experienced tectonic, volcanic, and interpretation of the hazard posed. The study shows that geochemical conditions in Muria Volcano complex composed of potassium, low-yield product predicted high-temperature molten magma (decompression) and high potassium levels (compression). Pattern of tectonic decompression geochemical conditions associated with low potassium in Muria old, while the pattern of tectonic compression geochemical conditions associated with high potassium in young Muria. The level of volcanic hazard in the future indicated by the nature of non capable of Mt. Muria. (author)

  12. Screening criteria of volcanic hazards aspect in the NPP site evaluation

    International Nuclear Information System (INIS)

    Nur Siwhan

    2013-01-01

    Studies have been conducted on the completeness of regulation in Indonesia particularly on volcanic hazards aspects in the evaluation of nuclear power plant site. Volcanic hazard aspect needed to identify potential external hazards that may endanger the safety of the operation of nuclear power plants. There are four stages for evaluating volcanic hazards, which are initial assessment, characterization sources of volcanic activity in the future, screening volcanic hazards and assessment of capable volcanic hazards. This paper discuss the third stage of the general evaluation which is the screening procedure of volcanic hazards. BAPETEN Chairman Regulation No. 2 Year of 2008 has only one screening criteria for missile volcanic phenomena, so it required screening criteria for other hazard phenomena that are pyroclastic flow density; lava flows; avalanche debris materials; lava; opening hole new eruptions, volcano missile; tsunamis; ground deformation; and hydrothermal system and ground water anomaly. (author)

  13. NPP Krsko decommissioning concept

    International Nuclear Information System (INIS)

    Novsak, M.; Fink, K.; Spiler, J.

    1996-01-01

    At the end of the operational lifetime of a nuclear power plant (NPP) it is necessary to take measures for the decommissioning as stated in different international regulations and also in the national Slovenian law. Based on these requirements Slovenian authorities requested the development of a site specific decommissioning plan for the NPP Krsko. In September 1995, the Nuklearna Elektrarna Krsko (NEK) developed a site specific scope and content for a decommissioning plan including the assumptions for determination of the decommissioning costs. The NEK Decommissioning Plan contains sufficient information to fulfill the decommissioning requirements identified by NRC, IAEA and OECD - NEA regulations. In this paper the activities and results of development of NEK Decommissioning Plan consisting of the development of three decommissioning strategies for the NPP Krsko and selection of the most suitable strategy based on site specific, social, technical, radiological and economic aspects, cost estimates for the strategies including the costs for construction of final disposal facilities for fuel/high level waste (fuel/HLW) and low/intermediate level waste (LLW/ILW) and scheduling of all activities necessary for the decommissioning of the NPP Krsko are presented. (author)

  14. NPP Krsko decommissioning concept

    International Nuclear Information System (INIS)

    Novsak, M.; Fink, K.; Spiler, J.

    1996-01-01

    At the end of the operational lifetime of a nuclear power plant (NPP) it is necessary to take measures for the decommissioning as stated in different international regulations and also in the national Slovenian law. Based on these requirements Slovenian authorities requested the development of a site specific decommissioning plan for the NPP KRSKO. In September 1995, the Nuklearna Elektrarna Krsko (NEK) developed a site specific scope and content for decommissioning plan including the assumptions for determination of the decommissioning costs. The NEK Decommissioning Plan contains sufficient information to fulfill decommissioning requirements identified by NRC, IAEA and OECD - NEA regulations. In this paper the activities and the results of development of NEK Decommissioning Plan consisting of the development of three decommissioning strategies for the NPP Krsko and selection of the most suitable strategy based on site specific, social, technical, radiological and economical aspects, cost estimates for the strategies including the costs for construction of final disposal facilities for fuel/high level waste (fuel/HLW) and low/intermediate level waste (LLW/ILW) and scheduling all activities necessary for the decommissioning of the NPP KRSKO are presented. (author)

  15. NPP decontamination

    International Nuclear Information System (INIS)

    Sedov, V.M.; Senin, E.V.; Nesterenko, A.P.; Zakharova, E.V.

    1988-01-01

    Decontamination methods for NPP with LWGR and WWER reactors are considered. Circuits iof NPP with LWGR are decontaminated with solutions on the basis of oxalic acid and hydrogen peroxide with addition of nitrate-ions, whereas WWER with complexones followed treatment with strong oxidizers. As a result of decontamination γ-background of the equipment decreases 5-100 fold. The instruments and room surfaces are decontaminated using vapour-ejecting sprayers, hydromonitors and special baths with solutions on the basis of mineral acids and complexones with various additions, which can be used for stainless and carbon steels, coatings of epoxide enamels and plastifiers. Methods of dry decontamination using easily peeled off coatings on the basis of polyvinyl alcohol and other materials lately are widely used for NPP room decontamination. Small metallic parts of surface are decontaminated by electrochemical method. Different mixtures of mineral and organic acids, as well as caustic potash and boric acid, are used as electrolytes

  16. The seismic reassessment Mochovce NPP

    International Nuclear Information System (INIS)

    Baumeister, P.

    2004-01-01

    The design of Mochovce NPP was based on the Novo-Voronez type WWER-440/213 reactor - twin units. Seismic characteristic of this region is characterized by very low activity. Mochovce NPP site is located on the rock soil with volcanic layer (andesit). Seismic reassessment of Mochovce NPP was done in two steps: deterministic approach up to commissioning confirmed value Horizontal Peak Ground Acceleration HPGA=0.1 g and activities after commissioning as a consequence of the IAEA mission indicate higher hazard values. (author)

  17. Experience from transportation of irradiated WWER-440 fuel assemblies at Kozloduy NPP site after a short cooling time

    International Nuclear Information System (INIS)

    Stoyanova, I.; Kamenov, A.; Byrzev, L.; Christoskov, I.

    2003-01-01

    The presented results from the computation and analysis of the radiation characteristics of the irradiated fuel assemblies by the date of their transportation according to the selected loading patterns of the VSPOT cask and following the modified technology of transportation, i.e. without replacement of the pool solution by pure condensate, as well as the corresponding experimental results, confirm the applicability of the newly introduced safety criterion for the selection of a loading pattern of the cask with irradiated fuel assemblies after a short cooling time. The comparison between measured and computed surface dose rates shows that during the procedure of transfer of irradiated fuel assemblies from the pools of Units 1 and 2 to the pools of Kozloduy NPP Units 3 and 4 all safety limits, incl. the radiation protection requirements, were met

  18. Emergency preparedness at Barsebaeck NPP in Sweden

    International Nuclear Information System (INIS)

    Olsson, R.; Lindvall, C.

    1998-01-01

    On-site emergency preparedness plan at Barsebaeck NPP is presented. In an emergency the responsibility of the NPP is to alarm the emergency organizations, spend all efforts to restore safe operation, assess the potential source term as to size and time, protect their own personnel, inform personnel and public. Detailed emergency procedures overview is provided

  19. Chernobyl NPP accident. Overcoming experience. Acquired lessons

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Vasil'chenko, V.N.; Klyuchnikov, A.A.; Prister, B.S.

    2006-01-01

    This book is devoted to the 20 anniversary of accident on the Chernobyl NPP unit 4. History of construction, causes of the accident and its consequences, actions for its mitigation are described. Modern situation with Chernobyl NPP decommissioning and transferring of 'Ukryttya' shelter into ecologically safe system are mentioned. The future of Chernobyl site and exclusion zone was discussed

  20. Spain in South Ukraine NPP

    International Nuclear Information System (INIS)

    Ibanez, M.

    1994-01-01

    A Technical Assistance Protocol was signed between the Governments of the GIS and the Commission of the European Union (CEU) on August 2, 1991 and this was the starting point of the TACIS program. In this article, the activities described are those related to the TACIS-92/93/94 on site technical assistance to South Ukraine NPP (SUK NPP). Within the scope of the TACIS 92 Program the CEU and the Ukrainian Authorities agreed a list of projects to be implemented at South Ukraine NPP with the aim to improve the operational safety of the plant. This part of the program is called TACIS 92 on-site activities. The total budget allocated to these projects is a MECU. The European Union ''utility'' selected to lead this program at South Ukraine NPP was UNESA and the first contract to cover our activities was signed in July 1993 between the CEU (Mr. Pablo Benavides) and UNESA (Mr. Pedro Rivero). The projects will be implemented at SUK NPP but according to the contract UNESA is ''The Consultant'' and GOSKOMATON (The Ukrainian Sate Committee on Nuclear Power Utilization) is the ''Recipient Institution''. (Author)

  1. Decommissioning of NPP A-1

    International Nuclear Information System (INIS)

    Anon

    2009-01-01

    In this presentation the Operation history of A1 NPP, Project 'Decommissioning of A1 NPP' - I stage, Project 'Decommissioning of A1 NPP ' - II stage and Next stages of Project 'Decommissioning of A1 NPP ' are discussed.

  2. Cuba: Juragua NPP. Project Control. Annex 5

    International Nuclear Information System (INIS)

    Serradet, M.A.

    1999-01-01

    This annex deals with project control. The long suspension of Juragua NPP has affected personnel, equipment and site structures. Efforts are being made to revive the plant and to protect existing resources (assets). An action plan has been prepared. (author)

  3. Mochovce NPP simulator

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    Mochovce NPP simulator basic features and detailed description of its characteristics are presented with its performance, certification and application for training of NPP operators as well as the training scenario

  4. Specification of requirements to get a license for an Independent Spent Fuel Dry Storage Installation (ISFSI) at the site of the NPP-LV

    International Nuclear Information System (INIS)

    Serrano R, M. L.

    2015-09-01

    This article describes some of the work done in the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) to define specifically the requirements that the Federal Electricity Commission (CFE) shall meet to submit for consideration of CNSNS an operation request of an Independent Spent Fuel Dry Storage Installation (ISFSI). The project of a facility of this type arose from the need to provide storage capacity for spent nuclear fuel in the nuclear power plant of Laguna Verde (NPP-LV) and to continue the operation at the same facility in a safe manner. The licensing of these facilities in the United States of America has two modes: specific license or general license. The characteristics of these licenses are described in this article. However, in Mexico the existing national legislation is not designed for such license types, in fact there is a lack of standards or regulations in this regard. The regulatory law of Article 27 of the Constitution in the nuclear matter, only generally establishes that this type of facility requires an authorization from the Ministry of Energy. For this reason and because there is not a national legislation, was necessary to use the legislation that provides the Nuclear Regulatory Commission of USA, the US NRC. However, it cannot be applied as is established, so was necessary that the CNSNS analyze one by one the requirements of both types of license and determine what would be required to NPP-LV to submit its operating license of ISFSI. The American regulatory applicable to an ISFSI, the 10-Cfr-72 of the US NRC, establishes the requirements for both types of licenses. Chapter 10-Cfr was analyzed in all its clauses and coupled to the laws, regulations and standards as well as to the requirements established by CNSNS, all associated with a store spent fuel on site; the respective certification of containers for spent fuel dry storage was not included in this article, even though the CNSNS also performed that activity under the

  5. Radionuclide localization at the Chernobyl' NPP territory

    International Nuclear Information System (INIS)

    Mamaev, L.A.; Galkin, G.A.; Khrabrov, S.L.; Polyakov, A.S.; Mikhejkin, S.V.

    1989-01-01

    Experience is generalized of using different dust suppression (DS) compounds during Chernobyl' accident consequence elimination. Polymer DS compounds were used at the NPP operating site; the compounds kept dust-like radioactive contaminations during 1-2 months. DS at the country was realized by means of the compound on base of latex. The conclusion is made that the DS measures improved radiation situation in the NPP zone. 7 refs

  6. Decommissioning of Brennilis NPP

    International Nuclear Information System (INIS)

    Baize, Jean-Marc

    1998-01-01

    This EDF press communique give information related to the decommissioning of the Brennilis NPP. The following five items are developed in this report: 1. the level-2 decommissioning operations at the Brennilis NPP; 2. the Brennilis NPP, a pilot operation from the commissioning up to the decommissioning; 3. history of the Brennilis NPP decommissioning; 4. the types of radioactive wastes generated by the Brennilis NPP decommissioning; 5. the Brennilis NPP - a yard management as a function of the wastes. The document contains also seven appendices addressing the following subjects: 1. the share of decommissioning assigned to EDF and the decommissioning steps; 2. the EDF installations in course of decommissioning; 3. the CEA decommissioned installations or in course of decommissioning; 4. regulations; 5. costs; 6. waste management - principles; 7. data on the decommissioning yard

  7. Assessment of seismic hazard for NPP sites in France analysis of several aftershocks of November 8, 1983, Liege earthquake

    International Nuclear Information System (INIS)

    Mohammadioun, B.; Mohammadioun, G.; Bresson, A.

    1984-03-01

    Current French practice for assessing seismic hazard on the sites of nuclear facilities is outlined. The procedure calls for as rich and varied an assortment of actual earthquake recordings as can be procured, including earthquakes in France itself and in nearby countries, recorded by the CEA/IPSN's own staff. Following the November 8, 1983, Liege earthquake, suitably equipped, temporary recording stations were set up in the epicentral area in order to record its aftershocks. Ground motion time histories and response spectra were computed for several of these, and a quality factor Q was derived from these data for the most superficial sedimentary layers of the area. The values obtained show reasonable agreement with ones found for similar materials in other regions

  8. Evaluation of equivalent dynamic soil properties from experimental and analytical studies of foundation model at the site of NPP Cernavoda

    International Nuclear Information System (INIS)

    Rotaru, I.; Bobei, M.; Mingiuc, C.; Serban, V.

    1997-01-01

    The seismic response of a building of the nuclear power plant, is determined, to a great extent, by the foundation soil parameters (the dependence of the shear mode and the internal damping with shear strain as result of the loads generated by seismic wave). These dynamic soil parameters values may determine (or not) the resonating of the building with the seismic excitation typical for that site and may or may not damp the seismic energy transferred to the building. Generally the determination of the soil dynamic parameters is made by measurements, in situ, of the 'p' and 's' propagation wave velocities for very low strain cases of the foundation soil as well as by lab testing with resonant column. In order to determine the shear models variation and the internal damping variation with the strain condition, upon the undersigned proposal, a study on a cylindrical model built in a cavity made in limestone and founded on clay layer was elaborated. The model was subjected to shocks generated by land blasting and to pulling by a tractor associated with the sudden release of the load and the module was left to oscillate freely. The model was subjected also to forced oscillations generated by a vibrator installed on top of the model. In order to determine the dynamic parameters of limestone layer, the behavior of the model after its embedding into limestone layer by cyclopean concrete poring was analyzed. Following to the analysis, the variation of shear mode and soil damping, for clay layer were determined. For limestone layer it was determined that the modification of parameter reduction is maximum 15 %. (authors)

  9. Project No. 7 - Decommissioning unit at Ignalina NPP. (Engineering and project management)

    International Nuclear Information System (INIS)

    2000-01-01

    In order to manage decommissioning process at Ignalina NPP, a new unit should be established in the framework of the Ignalina NPP organizational structure. The on-site Engineering Project Management Unit (PMU) will adopt an integrated approach to project management , engineering design, planning, procurement, safety and licensing activities at Ignalina NPP site. The PMU will assist the Ignalina NPP management in the development of an integrated decommissioning and waste management strategy

  10. Characterization in support of the activities of the plan of restoration of the site of the Jose Cabrera NPP; Caracterizacion soporte de las actividades del plan de restauracion del emplazamiento de la CN Jose Cabrera

    Energy Technology Data Exchange (ETDEWEB)

    Gimeno Blesa, M. E.; Lopez Fernandez, M. T.; Martin Palomo, N.

    2012-07-01

    This paper presents the methodology used to perform radiological characterization of the grounds of the Jose Cabrera NPP. The information gained in the early stages of planning the project of dismantling has been supplemented with the results of the campaigns developed during the implementation phase of the project. The joint analysis of all the data obtained, provided that they are sufficient in quantity and quality, is the starting point to establish the future actions of restoring the site; selection of the most appropriate restoration techniques and identification of specific areas of action.

  11. NPP service life management

    International Nuclear Information System (INIS)

    Elagin, Yu.P.

    2001-01-01

    Problems of NPP service life management and service life prolongation are reviewed. Methods for the prolongation of the French NPP service life are discussed, priority directions of nuclear block service life management in regard to aging in the context of the European program of investigation into the materials aging are identified. Questions of the provision of the 60 years service life of the Mihama 1 block (Japan) and decision of the problem of the control equipment aging in Great Britain are discussed. Situation with the prolongation of licenses on the NPP operation in the USA and Spain is considered [ru

  12. Integrated ageing management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos; Sabransky, Mario

    2013-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  13. Integrated ageing management of Atucha NPP

    Energy Technology Data Exchange (ETDEWEB)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos, E-mail: ranalli@cnea.gov.ar [Gerencia Coordinacion Proyectos CNEA-NASA, Comision Nacional de Energia Atomica, Buenos Aires (Argentina); Sabransky, Mario, E-mail: msabransky@na-sa.com.ar [Departamento Gestion de Envejecimiento, Central Nuclear Atucha I-II Nucleoelectrica Argentina S.A., Provincia de Buenos Aires (Argentina)

    2013-07-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  14. Integrated Ageing Management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, J.M.; Marchena, M.H.; Zorrilla, J.R.; Sabransky, M.

    2012-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor twice as big as Atucha I finishing a delayed construction . With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  15. NPP Multi-Biome: Global Primary Production Data Initiative Products

    Data.gov (United States)

    National Aeronautics and Space Administration — ABSTRACT: Under the auspices of the GPPDI, NPP estimates were compiled for 2,523 sites and 5,164 half-degree grid cells, by investigators based at the Environmental...

  16. Moving the largest capacity PWR dual-purpose cask in the world from Goesgen NPP to the Zwilag interim storage site

    International Nuclear Information System (INIS)

    Delannay, M.; Dudragne, S.

    2002-01-01

    The Swiss Goesgen nuclear power plant (NPP) has decided to use two different methods for the disposal of its spent fuel. (1) To reprocess some of its spent fuel in dedicated facilities. Some of the vitrified waste from the reprocessing will be shipped back to Switzerland using the new COGEMA Logistics, TN81 cask. (2) To ship the other part of its spent fuel to the central interim storage facility of Zwilag (Switzerland) using a COGEMA Logistics dual-purpose TN24G cask. The TN24G is the heaviest and largest dual-purpose cask manufactured so far by COGEMA Logistics in Europe. It is intended for the transport and storage of 37 pressurised water-reactor (PWR) spent fuel assemblies. Four casks were delivered by COGEMA Logistics to Goesgen NPP. Three transports of loaded TN24G casks between Goesgen and Zwilag were successfully performed at the beginning of 2002 with the new COGEMA Logistics Q76 wagon specifically designed to transport heavy casks. This article describes the procedure of operations and shipments for the first TN24G casks up to storage at Zwilag. The fourth transport of loaded TN24G was due to happen in October 2002. The TN24G cask, as part of the TN24 casks family, proved to be a very efficient solution for the KKG spent fuel management. (author)

  17. EMAS at Doel NPP

    International Nuclear Information System (INIS)

    Nolan, Peter; Thoelen, Els

    1998-01-01

    In October 1995, Doel NPP of Electrabel, Belgium opted to seek registration under the EC Eco-management and Audit Scheme (EMAS). A comprehensive environmental management system (EMS) has been introduced and implemented, encompassing all four PWRs and the supporting departments. A critical step was to seek certification from an accredited environmental auditing body against the International Standard ISO 14001. This provided the foundation for the publicly available environmental statement required by EMAS. The complications of achieving EMAS at a time when national and international standards were being re-formulated were successfully overcome and Doel NPP passed its EMAS audit in June 1997. (author)

  18. Temelin NPP commissioning experiences

    International Nuclear Information System (INIS)

    Hanus, V.

    2002-01-01

    The Building Permit for the Temelin NPP with four VVER units was issued in 1986, which is a long time ago. Since then, however, was taken a route that is very different from what anybody imagined. Described are the legislative and design changes and given is a current condition of the power plant

  19. Operating Experience at NPP Krsko

    International Nuclear Information System (INIS)

    Kavsek, D.; Bach, B.

    1998-01-01

    Systematic analysis of operational experience by assessment of internal and industry events and the feedback of lessons learned is one of the essential activities in the improvement of the operational safety and reliability of the nuclear power plant. At NPP Krsko we have developed a document called ''Operating Experience Assessment Program''. Its purpose is to establish administrative guidance for the processing of operating events including on-site and industry events. Assessment of internal events is based on the following methods: Event and Causal Factor Charting, Change Analysis, Barrier Analysis, MORT (Management Oversight and Risk Tree Analysis) and Human Performance Evaluation. The operating experience group has developed a sophisticated program entitled ''Operating experience tracking system'' (OETS) in response to the need for a more efficient way of processing internal and industry operating experience information. The Operating Experience Tracking System is used to initiate and track operational events including recommended actions follow up. Six screens of the system contain diverse essential information which allows tracking of operational events and enables different kinds of browsing. OETS is a part of the NPP Krsko nuclear network system and can be easily accessed by all plant personnel. (author)

  20. Modernization and safety improvement project of the NPP V-2 Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Michal, V.; Losonsky, B.; Magdolen, J.

    2000-01-01

    This contribution deals with the form, present state, and results of the Nuclear Power Plants Research Institute (the Slovak acronym is VUJE - Vyskumny Ustav Jadrovych Elektrarni) participation in the NPP V-2 Jaslovske Bohunice Modernization and Safety Improvement Project. A short description of VUJE history, activity, and results is also presented as well as NPPs Jaslovske Bohunice characterization. VUJE was established in 1977 and deals with scientific and research needs of nuclear power plants, such as design, construction, commissioning and operation. The next fields of VUJE activity are, NPP reconstruction, NPP personnel training, radioactive waste management technology, and NPP decommissioning. The nuclear power plant, Jaslovske Bohunice, is situated approximately 15 km from the district town of Trnava in the southwestern region of the Slovak Republic. The construction of the first Czechoslovak NPP A-1 began on this site in 1957 .The construction of the double-unit NPP V-1 with WWER-440 (type V-230) reactor began in 1972. The first unit of NPP V-1 began operation in 1978 and the second in 1980. NPPs construction on the Bohunice site continued with NPP V-2, which has two units with WWER-440 (type V-213) reactors. Unit 1 and Unit 2 of NPP V-2 were commissioned in 1984 and 1985, respectively. Slovak electric utility Slovenske elektrarne (SE) is the owner/commissioner of NPP V-2. This NPP is responsible for more than 20% of the total electrical energy production of SE, making it an essential supporter of the Slovak economy. (authors)

  1. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 1. Data related to sites and plants: Paks NPP, Kozloduy NPP. Working material

    International Nuclear Information System (INIS)

    1995-01-01

    The Co-ordinated research programme on the benchmark study for the seismic analysis and testing of WWER-type nuclear power plants was initiated subsequent to the request from representatives of Member States. The conclusions adopted at the Technical Committee Meeting on Seismic Issues related to existing nuclear power plants held in Tokyo in 1991 called for the harmonization of methods and criteria used in Member States in issues related to seismic safety. The Consulltants' Meeting which followed resulted in producing a working document for CRP. It was decided that a benchmark study is the most effective way to achieve the principal objective. Two types of WWER reactors (WWER-440/213 and WWER-1000) were selected as prototypes for the benchmark exercise to be tested on a full scale using explosions and/or vibration generators. The two prototypes are Kozloduy Units 5/6 for WWER-1000 and Paks for WWER-440/213 nuclear power plants. This volume of Working material contains reports on data related to sites and NPPs Paks and Kozloduy

  2. Mochovce NPP unit 1 and 2 completion project

    International Nuclear Information System (INIS)

    Holubec, J.

    1999-01-01

    History of Mochovce NPP is quite long and reflects political changes that happened in Europe in the end of 80'ties. The plant site was chosen in south-west of Slovakia in the frame of Nuclear Industry Development Plan adopted by former Czechoslovak government in 70'ties. In that time was decided to build in Mochovce four VVER 440/213 units together with other NPP's (Dukovany, Temelin, Kecerovce)

  3. NPOESS preparatory project (NPP)

    Science.gov (United States)

    Murphy, R. E.; Taylor, Raynor L.; Neeck, Steven P.; Wielicki, Bruce A.; Barkstrom, Bruce R.; Crison, M.; Swenson, J. R.

    1998-12-01

    The National Aeronautics and Space Administration (NASA) is studying options for future space-based missions, building upon the measurements to be made by the first series of Earth Observing System (EOS) missions. One mission under consideration is the NPOESS Preparatory Project (NPP), a cooperative mission of NASA and the National Polar-orbiting Operational Environmental Satellite System (NPOESS). This mission would utilize new instrument technologies being developed by the NPOESS, with additional NASA requirements, to continue certain measurements from the first series of EOS missions. By flying in the 2005 time period, NPP would provide an early demonstration and validation of new instrument technologies and algorithms in support of future NPOESS missions and extend the critical time series measurements of EOS.

  4. Supercompaction of radioactive waste at NPP Krsko

    International Nuclear Information System (INIS)

    Fink, K.; Sirola, P.

    1996-01-01

    The problem of radioactive waste management is both scientifically and technically complex and also deeply emotional issue. In the last twenty years the first two aspects have been mostly resolved up to the point of safe implementation. In the Republic of Slovenia, certain fundamentalist approaches in politics and the use of radioactive waste problem as a political tool, brought the final radioactive repository siting effort to a stop. Although small amounts of radioactive waste are produced in research institutes, hospitals and industry, major source of radioactive waste in Slovenia is the Nuclear Power Plant Krsko. When Krsko NPP was originally built, plans were made to construct a permanent radioactive waste disposal facility. This facility was supposed to be available to receive waste from the plant long before the on site storage facility was full. However, the permanent disposal facility is not yet available, and it became necessary to retain the wastes produced at the plant in the on-site storage facility for an extended period of time. Temporary radioactive storage capacity at the plant site has limited capacity and having no other options available NPP Krsko is undertaking major efforts to reduce waste volume generated to allow normal operation. This article describes the Radioactive Waste Compaction Campaign performed from November, 1994 through November, 1995 at Krsko NPP, to enhance the efficiency and safety of storage of radioactive waste. The campaign involved the retrieval, segmented gamma-spectrum measurement, dose rate measurement, compaction, re-packaging, and systematic storage of radioactive wastes which had been stored in the NPP radioactive waste storage building since plant commissioning. (author)

  5. Krsko NPP radioactive waste characteristics

    International Nuclear Information System (INIS)

    Skanata, D.; Kroselj, V.; Jankovic, M.

    2007-01-01

    In May 2005 Krsko NPP initiated the Radioactive Waste Characterization Project and commissioned its realization to the consulting company Enconet International, Zagreb. The Agency for Radwaste Management was invited to participate on the Project. The Project was successfully closed out in August 2006. The main Project goal consisted of systematization the existing and gathering the missing radiological, chemical, physical, mechanical, thermal and biological information and data on radioactive waste. In a general perspective, the Project may also be considered as a part of broader scope of activities to support state efforts to find a disposal solution for radioactive waste in Slovenia. The operational low and intermediate level radioactive waste has been structured into 6 waste streams that contain evaporator concentrates and tank sludges, spent ion resins, spent filters, compressible and non-compressible waste as well as specific waste. For each of mentioned waste streams, process schemes have been developed including raw waste, treatment and conditioning technologies, waste forms, containers and waste packages. In the paper the main results of the Characterization Project will be briefly described. The results will indicate that there are 17 different types of raw waste that have been processed by applying 9 treatment/conditioning technologies. By this way 18 different waste forms have been produced and stored into 3 types of containers. Within each type of container several combinations should be distinguished. Considering all of this, there are 34 different types of waste packages altogether that are currently stored in the Solid Radwaste Storage Facility at the Krsko NPP site. Because of these findings a new identification system has been recommended and consequently the improvement of the existing database on radioactive waste has been proposed. The potential areas of further in depth characterization are indicated. In the paper a brief description on the

  6. Dukovany NPP operation

    International Nuclear Information System (INIS)

    Vlcek, Jaroslav

    2010-01-01

    The topics discussed include: Dukovany NPP among CEZ Group power plants; International missions at the plant; Plant operation results; and Strategic goals and challenges. Historical data are presented in the graphical form, such as the unit capacity factor, unplanned capability loss factor, unplanned automatic scrams, fuel reliability, industrial safety accident rate, collective radiation exposure, WANO index, power generation data, and maximum achievable power by the end of year. Also discussed were the company culture and human resources, maintenance, power uprate, and related phenomena. (P.A.)

  7. Cernavoda NPP Knowledge Transfer

    International Nuclear Information System (INIS)

    Valache, C. M.

    2016-01-01

    Full text: The paper presents a description of the Knowledge Transfer (KT) process implemented at Cernavoda NPP, its designing and implementation. It is underlined that applying a KT approach should improve the value of existing processes of the organization through: • Identifying business, operational and safety risks due to knowledge gaps, • Transfer of knowledge from the ageing workforce to the peers and/or the organization, • Continually learning from successes and failures of individual or teams, • Convert tacit knowledge to explicit knowledge, • Improving operational and safety performance through creating both new knowledge and better access to existing knowledge. (author

  8. Site characterization techniques used in restoration of agricultural areas on the territory of the Russian Federation contaminated after the accident at the Chernobyl NPP

    International Nuclear Information System (INIS)

    Fesenko, S.V.; Alexakhin, R.M.; Sanzharova, N.I.

    2000-01-01

    The experience gained in the aftermath after the heavy radiation accidents shows the need for improvement in site characterisation techniques and methodology in order to provide a link between site characterisation and the selection of restoration strategies. This paper gives an overview of the site characterisation techniques used in restoration of contaminated agricultural lands on the territory of the Russian Federation. The approach used for site characterisation and selection of restoration strategies is described. The main site specific factors influencing the choice of restoration options are identified. Data on the efficiency of major restoration measures used for the remediation of agricultural lands after the Chernobyl Nuclear Power Plant and the Kyshtym accidents are given. A description of the decision support system FORCON, designed to simplify the selection of restoration options, is presented. (author)

  9. Operation safety at Ignalina NPP

    International Nuclear Information System (INIS)

    Zheltobriukh, G.

    1999-01-01

    An improvement of operational safety at Ignalina NPP covers: improvement of management structure and safety culture; symptom-based emergency operating procedures; staff training and full scope simulator; program of components ageing; metal inspection; improvement of fire safety. The first plan of Ignalina NPP Safety culture development for 1997 purposed to the SAR recommendation implementation was prepared and approved by the General Director

  10. Main features of modern Russian design of NPP with high power VVER reactors (AES-2006 design)

    International Nuclear Information System (INIS)

    Altshuller, A.M.; Svetlov, S.V.; Molchanov, A.V.; Kazarin, A.M.

    2009-01-01

    AES-2006 is a short name for an evolutionary NPP on the basis of the standard Russian VVER design. Activities aimed at AES-2006 design development for the Leningrad NPP-2 site (in Russia) were started in 2006, with the Tianwan NPP (in China) design being used as a basis. New design differs significantly from the Tianwan NPP design as follows: there are passive systems of BDBA management, borated water storage tanks are located inside the containment, some system diagrams are optimized. According to the Requirement Specification for AES-2006, the design shall meet both Russian standards and IAEA recommendations and EUR requirements. (author)

  11. Grohnde. Documentation of the police operation during the demonstration against the NPP Grohnde on 19.03.1977 and the evacuation of the occupied cooling tower site on 23.08.1977; Grohnde. Dokumentation der Polizeieinsaetze anlaesslich der Demonstration gegen das Kernkraftwerk Grohnde am 19.03.1977 und der Raeumung des besetzten Kuehlturmgelaendes am 23.08.1977

    Energy Technology Data Exchange (ETDEWEB)

    Stricker, Michael

    2014-07-01

    The documentation of the police operation during the demonstration against the NPP Grohnde on 16.03.1977 and the evacuation of the occupied cooling tower site on 23.08.1977 covers the following issues: involved action forces: police Niedersachsen, police Nordrhein-Westfalen, police Schleswig-Holstein, police Bremen and the Bundesgrenzschutz; concept of the police operation, provisions (lodging and board) for the police, operating resources, details of the operation sequence; post-processing of the operation; the Grohnde trials.

  12. Workflow in Almaraz NPP

    International Nuclear Information System (INIS)

    Gonzalez Crego, E.; Martin Lopez-Suevos, C.

    2000-01-01

    Almaraz NPP decided to incorporate Workflow into its information system in response to the need to provide exhaustive follow-up and monitoring of each phase of the different procedures it manages. Oracle's Workflow was chosen for this purpose and it was integrated with previously developed applications. The objectives to be met in the incorporation of Workflow were as follows: Strict monitoring of procedures and processes. Detection of bottlenecks in the flow of information. Notification of those affected by pending tasks. Flexible allocation of tasks to user groups. Improved monitoring of management procedures. Improved communication. Similarly, special care was taken to: Integrate workflow processes with existing control panels. Synchronize workflow with installation procedures. Ensure that the system reflects use of paper forms. At present the Corrective Maintenance Request module is being operated using Workflow and the Work Orders and Notice of Order modules are about to follow suit. (Author)

  13. Public acceptance of nuclear energy in Indonesia. A traditional puppet show for NPP in Java

    International Nuclear Information System (INIS)

    Suyudi Soeliarno

    1995-01-01

    In Indonesia, activities on public relation have been carried out since the establishment of the agency responsible for research and development of atomic energy in 1958 (which later in the year 1964 became Batan, National Atomic Energy Agency), wile activities on public acceptance started 'at the end of 1985. After the Government indicated that it has to look seriously into the construction of the NPP, as from 1990, the public acceptance (PA) activities have been intensified in anticipation of the construction of the first NPP. An important part of the preparatory activities for the construction of the NPP is preparing the people, particularly those who live near the NPP site, to accept and to support the NPP program. The interdepartmental team has bee established in August 1990 consisting of representatives of several institutions, namely, Ministry of Information, Ministry of Domestic Affairs, Ministry of Defense, Land Utilization Agency, State Electricity Corporation, Office of the Minister for Population and Environment, and Batan. This team, called the 'Team on Public Acceptance of NPP', has the main task providing extensive information to the public concerning the government plan to construct nuclear power plants in Indonesia. From 1990 through the middle of 1994 the activity of the Team on Public Acceptance of NPP was focused on providing information on te NPP program to the local community leaders and the public, particularly in the districts of the NPP site in the Muria Peninsula region. Its main purpose was to precondition the people who live near the NPP site to accept the NPP in their neighbourhood without fear

  14. Chernobyl'-88. Reports of the 1. All-Union scientific and technical meeting on results of accident effect elimination at the Chernobyl' NPP. V. 7. Part 1. Localization of accident consequences at the 4th power unit, operating site of the Chernobyl NPP and adjoining territories

    International Nuclear Information System (INIS)

    Ignatenko, E.I.

    1989-01-01

    The next data on the accident consequence elimination are presented: temperature monitoring results, gamma radiation exposure dose rates, neutron and gamma fields, aerosol disperse composition. The information system for scientific researches FINISH and automatic subsystems for radiation control and the Ukrytie object diagnostics are described. Decontamination of the Chernobyl' NPP territory, equipment and rooms is described too

  15. Chernobyl'-88. Reports of the 1. All-Union scientific and technical meeting on results of accident effect elimination at the Chernobyl' NPP. V. 7. Part 2. Localization of accident consequences at the 4th power unit, operating site of the Chernobyl' NPP and adjoining territories

    International Nuclear Information System (INIS)

    Ignatenko, E.I.

    1989-01-01

    The next data on the accident consequence elimination are presented: temperature monitoring results, gamma radiation exposure dose rates, neutron and gamma fields, aerosol disperse composition. The information system for scientific researches FINISH and automatic subsystems for radiation control and the Ukrytie object diagnostics are described. Decontamination of the Chernobyl' NPP territory, equipment and rooms is described too

  16. Selection of NPP for Kazakhstan

    International Nuclear Information System (INIS)

    Zhotabaev, Zh.R.

    2003-01-01

    Commercial NPP for Kazakhstan should to meet to several main requirements: 1). Safety operation (accident probability not more than 10 -6 1/p. year). 2). High efficiency > 40 %. 3). Possibility of use for high-temperature chemistry and hydrogen production. 4). Possibility for manufacturing of considerable part of equipment in Kazakhstan. 5). Possibility for fuel production and reprocessing in Kazakhstan. 6). Independence from existence of large water-supply sources. Comparative analysis of several NPP with different reactors (WWR-1000, Candu, BREST, VG-400; graphite molten salt reactor) shows that NPP with the graphite molten salt reactor meets to all above requirements, but hydrogen production it is possible by more complete 4-stage technology, since coolant temperature is 800 Deg. C. The principle advantage is possibility of manufacturing of main equipment and fuel in Kazakhstan that reduce the cost of NPP construction and operation

  17. Modernization programme at Dukovany NPP

    International Nuclear Information System (INIS)

    Trnka, M.

    2000-01-01

    The main goal of each NPP is to produce electricity safely, economically and without influence to environment. For Dukovany NPP it means to upgrade all documentation and perform the Equipment Upgrading Programme. All these activities are time and money consuming and therefore the determination of priority of all items was necessary. In the presentation there are mentioned some important changes in documentation, results of PSA studies and reason for Equipment Upgrading Programme performance. It was selected the most important item from the list of Equipment Upgrading Programme the I and C upgrading. Management has decided that Dukovany NPP will become among the best NPPs with WWER type of reactor. It seems this decision is the best way how to extend lifetime of the NPP. (author)

  18. Psychology of NPP operation safety

    International Nuclear Information System (INIS)

    Tret'yakov, V.P.

    1993-01-01

    The book is devoted to psychologic investigations into different aspects of NPP operative personnel activities. The whole set of conditions on which successful and accident-free personnel operation depends, is analysed. Based on original engineering and socio-psychologic investigations complex psychologic support for NPP personnel and a system of training and upkeep of operative personnel skills are developed. The methods proposed have undergone a practical examination and proved their efficiency. 154 refs., 12 figs., 9 tabs

  19. Baltic NPP Project specifics and current status

    International Nuclear Information System (INIS)

    2011-01-01

    Project overview: 2 x 1194 MW Units (AES-2006 series); Location in Kaliningrad region of the; Russian Federation; Operation dates: Unit 1 – Oct 2016; Unit 2 – Apr 2018; Site preparatory works ongoing. This is first NPP project in the Russian Federation providing opportunity for participation of foreign investors. Foreign investors may acquire up to 49% share. Cross-border transmission lines developed under separate project with participation of foreign investors. Conclusion: At the selected set of assumptions, the project is financially feasible in all scenarios

  20. NPP Decommissioning: the concept; state of activities

    International Nuclear Information System (INIS)

    Nemytov, S.; Zimin, V.

    2001-01-01

    The main principles of NPP decommissioning concept in Russia are given. The conditions with fulfillment of works on NPP unit pre-decommissioning and decommissioning including: development of the normative documentation, creation of special fund for financing NPP decommissioning activities, deriving the Gosatomnadzor license for decommissioning of shut down NPP units, development of the equipment and technologies for waste and spent fuel management are presented. The decommissioning cost and labour intensity of one WWER-440 unit are shown. The practical works, executed on shut down units at Beloyarsk NPP (Unit1 and 2) and Novo Voronezh NPP (Unit 1 and 2) are outlined

  1. Survey of public participation potential regarding the Muria NPP program

    International Nuclear Information System (INIS)

    Yarianto-SBS; Sri Hariani Syarif; Heni Susiati; Imam Hamzah; Fepriadi

    2003-01-01

    Socio-culture aspect is a part of site feasibility evaluation of Nuclear Power Plant (NPP)program. Indonesia is under going democratization, therefore the paradigm of development has also been changed where the people have freedom or liberty and they can express their opinion independently. The people are significant factor that involving in the decision making of regional development.Even the socio-culture, such as social riot can reject the site. Therefore socio-culture aspect should be considered in the NPP site evaluation. The first step of the study,mapping of public participation potential should be conducted by field survey. The method used in there search is quantitative approach with field survey guided by questioner without any treatment of object sampled. Qualitative approach was also conducted by in-depth interview technique to collect more detailed information. Information were collected from general public without any stratification in the 10 km radius from NPP site. Sampling method used was full random sampling technique. The results of survey show that the most of the people have significant potential for participating in the NPP Program. Conducive atmosphere should be maintained by social setting, therefore the present good momentum will not be lost. (author)

  2. Decommissioning of unit 1 of Ignalina NPP - Donors conference

    International Nuclear Information System (INIS)

    Vaitkus, R.

    2000-01-01

    Decision to decommission unit 1 of Ignalina NPP was related with possible financial assistance from foreign countries, first of from EU. Government of Lithuania jointly with European Commission on 20 - 21 June 2000 is organising Donors conference in order to collect necessary funds for the decommissioning of unit 1. Preparation to the donors conference is described. Information on the preparation to the decommissioning of unit 1 of Ignalina NPP and the Donors Conference is available on the Internet, web-site address www.ekm.lt/decom

  3. Emergency preparedness at Ignalina NPP

    International Nuclear Information System (INIS)

    Kairys, A.

    1998-01-01

    Brief review of Ignalina NPP safety upgrading and personnel preparedness to act in cases of accidents is presented. Though great activities are performed in enhancing the plant operation safety, the Ignalina NPP management pays a lot of attention to preparedness for emergency elimination and take measures to stop emergency spreading. A new Ignalina NPP emergency preparedness plan was drawn up and became operational. It is the main document to carry out organizational, technical, medical, evacuation and other activities to protect plant personnel, population, the plant and the environment from accident consequences. Great assistance was rendered by Swedish experts in drawing this new emergency preparedness plan. The plan consists of 3 parts: general part, operative part and appendixes. The plan is applied to the Ignalina NPP personnel, Special and Fire Brigade and also to other contractor organizations personnel carrying out works at Ignalina NPP. There are set the following emergency classes: incident, emergency situation, alert, local emergency, general emergency. Separate intervention level corresponds to each emergency class. Overview of personnel training to act in case of an emergency is also presented

  4. The regulatory requirements, design bases, researches and assessments in the field of Ukrainian NPP's seismic safety

    Energy Technology Data Exchange (ETDEWEB)

    Mykolaychuk, O.; Mayboroda, O.; Krytskyy, V.; Karnaukhov, O. [Ministry of Environment and Natural Resources, (Ukraine)

    2001-07-01

    State Nuclear Regulatory Authority of Ukraine (SNRA) pays large attention to problem of nuclear installations seismic stability. As a result the seismic design regulatory guides is revised, additional seismic researches of NPP sites are conducted, seismic reassessment of NPP designs were begun. The experts involved address all seismic related factors under close contact with the staff of NPP, design institutes and research organizations. This document takes stock on the situation and the research programs. (author)

  5. NPP Multi-Biome: Global Primary Production Data Initiative Products, R2

    Data.gov (United States)

    National Aeronautics and Space Administration — Net primary productivity (NPP) estimates were compiled by the Global Primary Production Data Initiative (GPPDI). The database covers 2,523 individual sites and 5,164...

  6. Russian normative approach to the question of management of NPP life time

    International Nuclear Information System (INIS)

    Karpunin, N.I.

    2002-01-01

    Full text: In Russia, the designated service life of a nuclear power plant (NPP) is 30 years. During the period 2001-2010, 15 Russian NPP units will reach the end of their service life. The 'Basic Provisions of NPP Safety Assurance', OPB-88/97, Item 5.1.14, provide for a possible extension of NPP operation beyond the designated service life. For such an extension, the NPP operating organization must apply for a license renewal to Gosatomnadzor, which needs to specify the relevant requirements. GAN is developing regulatory documents to provide a basis for NPP license renewal/extension of NPP operation, which would benefit from international experience. In accordance with 'The program of Atomic Energy Development in the Russian Federation for 1998-2005 and up to 2010' adopted by Decree No. 815 of the Government of the Russian Federation on 21 July 1998, priority is placed on the preparation of NPPs for extension of service life and on ensuring safety in the extended operating period. The length of the extension beyond the designated service life is to be determined on the basis of a range of technical and economic considerations, including: The ability to ensure and maintain operational safety; Sufficient residual service life of the unit's non-repairable components; The availability of temporary storage facilities for the additional spent nuclear fuel and radioactive waste, or the possibility of its transport off-site; The ability to ensure safe handling of the radioactive waste generated during the extension period; To extend the lifetime of an NPP unit, the plant Operator is required to perform the following tasks: Carry out a comprehensive survey of the NPP unit; Draw up a programme of preparation for lifetime extension; Prepare the NPP unit for operation in the extended period; Carry out the necessary tests. There are also some normative documents, which regulate management of NPP life time. (author)

  7. Regulatory aspects of NPP safety

    International Nuclear Information System (INIS)

    Kastchiev, G.

    1999-01-01

    Extensive review of the NPP Safety is presented including tasks of Ministry of Health, Ministry of Internal Affairs, Ministry of Environment and Waters, Ministry of Defense in the field of national system for monitoring the nuclear power. In the frame of national nuclear safety legislation Bulgaria is in the process of approximation of the national legislation to that of EC. Detailed analysis of the status of regulatory body, its functions, organisation structure, responsibilities and future tasks is included. Basis for establishing the system of regulatory inspections and safety enforcement as well as intensification of inspections is described. Assessment of safety modifications is concerned with complex program for reconstruction of Units 1-4 of Kozloduy NPP, as well as for modernisation of Units 5 and 6. Qualification and licensing of the NPP personnel, Year 2000 problem, priorities and the need of international assistance are mentioned

  8. Safety culture at Mochovce NPP

    International Nuclear Information System (INIS)

    Markus, Jozef; Feik, Karol

    2002-01-01

    This article presents the approach of Mochovce NPP to the Safety culture. It presents activities, which have been taken by Mochovce NPP up to date in the area of Safety culture enhancement with the aim of getting the term into the subconscious of each employee, and thus minimising the human factor impact on occurrence of operational events in all safety areas. The article furthermore presents the most essential information on how the elements characterising a continuous progress in reaching the planned Safety culture goals of the company management have been implemented at Mochovce NPP, as well as the management's efforts to get among the best nuclear power plant operators in this area and to be an example for the others. (author)

  9. Seismic potential of Bushehr region, NPP site

    International Nuclear Information System (INIS)

    Taghizadeh, G.A.; Peyman, M.; Behzadi, K.

    1985-01-01

    According to geological and seismological information and proposed model for plate tectonics of Iran, plates of Iran Arabia move north-eastwards with different velocities. This causes subduction of Iran plate by Arabian plate, folding of Zagros Range and seismic activities in the region. Investigation of recorded shocks in Bushehr Seismographic Network in recent 10 years, and historical seismicity record show that southern Zagros region should not be considered a single seismotectonic province, since it demonstrates at least distinct seismic characteristics in two aspects. First, eastern part of Qatar-Kazerun flexure suffers severe seismic activity, and Lar region has been devastated several times by destructive earthquakes in the present century. Second, Bushehr environment, which is located at the western part of Qatar-Kazerun line, according to historical records, bears considerable quiescence and is one of the seismically pacific quarters of the Iranian plateau. It is worth mentioning that, during the past 1000 years, the strongest earthquake close to Bushehr was a shock with a magnitude of 5, 50 Km distant. Accordingly, despite geographical proximity to seismically active Zagros belt, Bushehr bears considerably low seismicity and has relative quiescence and stability, and from this point, seismic characteristics of the region, relates to Arabian and Persian Gulf region than Iranian plateau. It follows that Bushehr region could be considered northern most part of Arabian plate. Should the complementary studies confirm the above conclusion, Bushehr would be the most promising region for development of important industrial projects. (Author)

  10. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  11. Radioactive wastes management of NPP

    International Nuclear Information System (INIS)

    Klyuchnikov, A.A.; Pazukhin, Eh.M.; Shigera, Yu. M.; Shigera, V.Yu.

    2005-01-01

    Modern knowledge in the field of radiation waste management on example of the most serious man-made accident at Chernobyl NPP are illuminated. This nuclear power plant that after accident in 1986 became in definite aspect an experimental scientific ground, includes all variety of problems which have to be solved by NPP personnel and specialists from scientific organizations. This book is aimed for large sphere of readers. It will be useful for students, engineers, specialists and those working in the field of nuclear power, ionizing source and radiation technology use for acquiring modern experience in nuclear material management

  12. NPP safety and efficiency increasing. Proceedings

    International Nuclear Information System (INIS)

    2011-01-01

    The main topics of the conference are the analysis and increasing of NPP safety; efficiency improvement and extension of service life of NPP; innovation in the field of radiation and ecological safety of NPP; professional education for operating and regulatory organizations.

  13. On geological and geophysical safety of the new state confinement for ChNPP-4

    International Nuclear Information System (INIS)

    Sestopalov, V.M.; Shibetskij, Yu.A.

    2016-01-01

    The paper considers evidences and mechanisms of potential impact of local depression (microgeodynamic) zones on NPP safety. The depression forms were revealed within the Chornobyl NPP site, including location of the new safe confinement. Nature of zones and character of their influence is determined by fault structures and conjugated deep degassing processes, which cannot be detected and studied by traditional methods of engineering and exploration works during NPP siting. The assumption was made that significant and still unexplored risks for nuclear facilities are related to probable release of deep hydrogen through the bottom of depressions along sub-bottom channels. The approaches were proposed to studying the system of 'depression with its sub-bottom channel' within the sites of Chornobyl NPP and other nuclear power plants

  14. The Chernobyl NPP decommissioning: Current status and alternatives

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Steinberg, N.

    1996-01-01

    After the Chernobyl accident of April 26, 1986, many contradictory decisions were taken concerning the Chernobyl nuclear power plant (NPP) future. The principal source of contradictions was a deadline for a final shutdown of the Chernobyl NPP units. Alterations in a political and socioeconomic environment resulted in the latest decision of the Ukrainian Authorities about 2000 as a deadline for a beginning of the Chernobyl NPP decommissioning. The date seems a sound compromise among the parties concerned. However, in order to meet the data a lot of work should be done. First of all, a decommissioning strategy has to be established. The problem is complicated due to both site-specific aspects and an absence of proven solutions for the RBMK-type reactor decommissioning. In the paper the problem of decommissioning option selection is considered taking into account an influence of the following factors: relevant legislative and regulatory requirements; resources required to carry out decommissioning (man-power, equipment, technologies, waste management infrastructure, etc.); radiological and physical status of the plant, including structural integrity and predictable age and weather effects; impact of planned activities at the destroyed unit 4 and within the 30-km exclusion zone of the Chernobyl NPP; planed use of the site; socio-economic considerations

  15. Low level radioactive waste disposal in Kozloduy NPP in Bulgaria

    International Nuclear Information System (INIS)

    Stanchev, V.

    2001-01-01

    Kozloduy NPP is the biggest power plant in the Republic of Bulgaria. It is in operation since 1974 and for the past 25 years it has generated over 263 billion kWh electric power. The NPP share in the total electric production in 1998 was about 50%. It has six units in operation - four WWER 440 B-230 and two WWER 1000 B-320. In the nuclear reactor operation the generation of radioactive waste (RAW) is an inevitable process. The waste must be conditioned, stored and disposed of in a safe manner. There are no national radioactive waste disposal facilities, for waste generated by an NPP, in Bulgaria to the moment. This situation necessitates the storage of operational RAW to be carried out on site for a long period of time (30 to 50 years). Following the principle for protection of human health and environment now and in the future, Kozloduy NPP adopted the concept for conditioning the RAW to a stable solid form and placing the waste in a package which should keep its features for a sufficiently long term so that the package can be safely transported to the disposal site. (author)

  16. Qualification of NPP operations personnel

    International Nuclear Information System (INIS)

    Wang Jiao.

    1987-01-01

    Competence of personnel is one of the important problems for safety operation of nuclear power plant. This paper gives a description of some aspects, such as the administration of NPP, posts, competence of personnel, training, assessing the competence and personnel management

  17. Safety aspects of NPP ageing

    International Nuclear Information System (INIS)

    1995-01-01

    Preparation of safety practices on assessment and management of aging of major NPP components important to safety, CRP on management of aging of concrete containment buildings, CRP on management of aging of in-containment instrumentation and control cables are outlined

  18. Radiation protection in decommissioning of the NPP V1

    International Nuclear Information System (INIS)

    Svitek, J.; Kaizer, J.; Siska, J.

    2014-01-01

    What's new in decommissioning of the NPP V1? In 2014 the first stage of the decommissioning should be finished. The program of the first stage was characterized by decommissioning of the non-contaminated facilities and buildings (facilities and buildings out of the control area). However, during the first stage, two key activities were done during which radiation protection had to be especially supervised: BIDSF project - Treatment and Conditioning of Wet Historical Waste - Sludge and Sorbents in the operational tanks NPP V1 (the treatment has been the condition of the regulatory body for the ending of the first stage) and preparation of decontamination of both primary circuits NPP (without reactors). In the year 2015, the second stage of decommissioning should be started. Program for the second stage is broad and it includes fragmentation and treatment of activated parts of the primary circuits (reactors, their internal parts, shielding cassettes). Modification of the radiation protection equipment on the NPP site has been made by BIDSF projects. During the first stage, two basic projects have been done: C12 - Refurbishment of the radiation protection monitoring equipment and C-10 - Free release of decommissioning materials. The present state of monitoring systems, as the result of the aforementioned projects, and the first experiences are main part of this presentation. Another activity, which prepared basic conditions for an execution of radiation protection in the second stage of decommissioning, was the preparation of documents for the procurement of license for the second stage of decommissioning. (authors)

  19. On-site and off-site activities

    International Nuclear Information System (INIS)

    Martin, H.D.

    1986-01-01

    Design principles for NPP training programs. Effects of NPP contracts. Effects of domestic industrial activities. The role of international bodies. Requirements for on-site training. Training abroad, technical, financial and social aspects. Training center on-site, an evaluation. (orig.)

  20. Retrofitting of NPP Computer systems

    International Nuclear Information System (INIS)

    Pettersen, G.

    1994-01-01

    Retrofitting of nuclear power plant control rooms is a continuing process for most utilities. This involves introducing and/or extending computer-based solutions for surveillance and control as well as improving the human-computer interface. The paper describes typical requirements when retrofitting NPP process computer systems, and focuses on the activities of Institute for energieteknikk, OECD Halden Reactor project with respect to such retrofitting, using examples from actual delivery projects. In particular, a project carried out for Forsmarksverket in Sweden comprising upgrade of the operator system in the control rooms of units 1 and 2 is described. As many of the problems of retrofitting NPP process computer systems are similar to such work in other kinds of process industries, an example from a non-nuclear application area is also given

  1. ASSET experience at Paks NPP

    International Nuclear Information System (INIS)

    Szabo, I.

    1997-01-01

    At Paks NPP special attention has been paid to international reviews since the very beginning of operation. Several international teams visited Paks in order to provide independent assessment of plant performance, conditions and safety. Paks NPP Management has the further intention to invite international reviews regularly (yearly) in the future as well. The experience gained during these reviews helped to establish a unified process of preparation for the reviews, performing them and handling the results. The Safety Department is in charge of organization of the whole process. All these reviews have their specific features and they are focused on different areas. The ASSET reviews provides the assessment of plant performance and safety through the analysis of safety significant events, which have occurred at the nuclear power plant. This approach makes this review specific and different from the other ones

  2. Report on Fukushima Daiichi NPP precursor events

    International Nuclear Information System (INIS)

    2014-01-01

    The main questions to be answered by this report were: The Fukushima Daiichi NPP accident, could it have been prevented? If there is a next severe accident, may it be prevented? To answer the first question, the report addressed several aspects. First, the report investigated whether precursors to the Fukushima Daiichi NPP accident existed in the operating experience; second, the reasons why these precursors did not evolve into a severe accident. Third, whether lessons learned from these precursor events were adequately considered by member countries; and finally, if the operating experience feedback system needs to be improved, based on the previous analysis. To address the second question which is much more challenging, the report considered precursor events identified through a search and analysis of the IRS database and also precursors events based on risk significance. Both methods can point out areas where further work may be needed, even if it depends heavily on design and site-specific factors. From the operating experience side, more efforts are needed to ensure timely and full implementation of lessons learnt from precursor events. Concerning risk considerations, a combined use of risk precursors and operating experience may drive to effective changes to plants to reduce risk. The report also contains a short description and evaluation of selected precursors that are related to the course of the Fukushima Daiichi NPP accident. The report addresses the question whether operating experience feedback can be effectively used to identify plant vulnerabilities and minimize potential for severe core damage accidents. Based on several of the precursor events national or international in-depth evaluations were started. The vulnerability of NPPs due to external and internal flooding has clearly been addressed. In addition to the IRS based investigation, the WGRISK was asked to identify important precursor events based on risk significance. These precursors have

  3. NPP Krsko Living PSA Concept

    International Nuclear Information System (INIS)

    Vrbanic, I.; Spiler, J.

    2000-01-01

    NPP Krsko developed PSA model of internal and external initiators within the frame of the Individual Plant Examination (IPE) project. Within this project PSA model was used to examine the existing plant design features. In order to continue with use of this PSA model upon the completion of IPE in various risk-informed applications in support of plant operation and evaluations of design changes, an appropriate living PSA concept needed to be defined. The Living PSA concept is in NPP Krsko considered as being a set of activities pursued in order to update existing PSA model in a manner that it appropriately represents the plant design, operation practice and history. Only a PSA model which is being updated in this manner can serve as a platform for plant-specific risk informed applications. The NPP Krsko living PSA concept is based on the following major ponts. First, the baseline PSA model is defined, which is to be maintained and updated and which is to be reference point for any risk-informed application. Second, issues having a potential for impact on baseline PSA model are identified and procedure and responsibilities for their permanent monitoring and evaluation are established. Third, manner is defined in which consequential changes to baseline PSA model are implemented and controlled, together with associated responsibilities. Finally, the process is defined by which the existing version of baseline PSA model is superseded by a new one. Each time a new version of baseline PSA model is released, it would be re-quantified and the results evaluated and interpreted. By documenting these re-quantifications and evaluations of results in a sequence, the track is being kept of changes in long-term averaged risk perspective, represented by long-term averaged frequencies of core damage and pre-defined release categories. These major topics of NPP Krsko living PSA concept are presented and discussed in the paper. (author)

  4. Licensing of the Ignalina NPP

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Since 1991 State Nuclear Power Safety Inspectorate (VATESI) has regulated Ignalina NPP operation by issuing annual operating permits. Those have been issued following submission of specified documents by the Ignalina NPP that have been reviewed by VATESI. However, according to to the procedures that are now established in the Law on Nuclear Energy and subordinate regulations the use of nuclear energy in the Republic of Lithuania is subject to strict licensing. Therefore a decision about the licence for continued operation of unit 1 should be taken. Licence would be granted by VATESI in cooperation with the Ministry of Health, Ministry of Environment and the institutions of local authorities. Ignalina NPP presented to the VATESI safety analysis report (SAR) with other documents. SAR was made mainly by foreign experts and financed by European Bank for Reconstruction and Development (EBRD). VATESI in this process is supported by western regulators. A special project LAP - Licensing Assistance Project was launched to help VATESI perform licensing according western practices

  5. Estimating decontamination efficiency of territory, adjoining to the Chernobyl' NPP

    International Nuclear Information System (INIS)

    Konstantinov, E.A.; Sanitarov, V.A.; Stepanov, I.K.; Senin, E.V.; Filippov, E.M.; Shiraj, A.P.; Umanets, M.P.

    1989-01-01

    The NPP territory decontamination was fulfilled according to the next scheme: 1) removal of the soil upper layer and its moving avay for burial; 2) concrete plate laying; 3) concreting seams between plates and piling up polymer coatings. The conclusion is made that substantial improvement of radiation situation at the operating site is possible only after removal of radiation sources at the machine room roofing. 1 ref.; 5 figs.; 2 tabs

  6. Ignalina NPP: living and working conditions

    International Nuclear Information System (INIS)

    Chiuzhas, A.

    1998-01-01

    The conference was devoted to discuss the social problems related with the operation of Ignalina NPP. The main topics are the following: analysis of public opinion of surrounding region of Ignalina NPP including neighbouring Daugavpils district in Latvia, environment impact evaluation of Daugavpils district, assessment of the influence of Ignalina NPP operation to the development of business in the region, investigation of problems of Visaginas town - residence of Ignalina NPP personnel. The specificity of Visaginas (former Sniechkus) is defined by the majority of non-native Lithuanians living there. Cultural transformation and political organization of the region were surveyed as well

  7. Prospects for the NPP Krsko Radioactive Waste Management

    International Nuclear Information System (INIS)

    Knapp, A.; Levanat, I.; Saponja-Milutinovic, D.

    2016-01-01

    Croatia adopted Strategy of radioactive waste, used sources and spent fuel management in 2014, and its Law on radiological and nuclear safety was accordingly modified in 2015. The Strategy foresees (though with some flexibility) and the Law declares decidedly that Croatia will establish a Center for radioactive waste management, in which all necessary facilities for storage and subsequent disposal of the Croatian share of the NPP Krsko radioactive waste and spent fuel will be developed. However, Slovenia and Croatia have recently agreed that a long-term dry storage for spent fuel will be established on the NPP premises by the year 2019. Therefore, only the issues of low and intermediate level waste (LILW) are addressed here. In Slovenia, the LILW repository site Vrbina in Krsko municipality was officially confirmed in 2009. Based on the 2013 investment program for a silo-type disposal facility, preparation of the repository project documentation was contracted with a national engineering company in 2014. Slovenian repository concept has been developed in two variants: one for the Slovenian LILW only, and the other intended to accept the Croatian share of LILW from the NPP as well. In the summer of 2015 Slovenia for the first time made an official offer to Croatia to use Vrbina repository for that purpose. However, the Croatian Strategy also does not preclude the option of management of all LILW from the NPP in Croatia. Therefore, present plan of activities for the third revision of the NPP radioactive waste and spent fuel management program outlines hypothetically symmetrical LILW management options: all in Slovenia, or all in Croatia, or one half in each country. So, what shall it be? This paper discusses the prospects for each of the three above mentioned options. The major problem of the Slovenian disposal plan is its high cost, mostly due to high compensations to the local community, which will be hard to finance without Croatian participation. The simplest

  8. Metamorphosis of NPP A1, V1, V2

    International Nuclear Information System (INIS)

    Dobak, D.; Moncekova, M.

    2005-01-01

    In this book the history of construction, commissioning and exploitation of NPP A1, NPP V1 and NPP V2 in Jaslovske Bohunice is presented on documentary photos. Vicinity around of these NPPs is presented, too

  9. Industry Operating Experience Process at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Bozin, B.; Cizmek, R.

    2012-01-01

    according to Corrective Action Program, which establishes guidance on the effective and efficient use of operating experience information to improve plant/personnel safety, plant reliability and commercial performance. The primary objectives of the Operating Experience Program are to promote the identification and transfer of lessons learned from internal and industry events to the plant personnel, and assure that such lessons are shared between Krsko NPP and the nuclear industry. The Operating Experience Program expects to prevent similar events from occurring at Krsko NPP by increasing plant personnel awareness of previous on-site and industry events and issues. Operating Experience Program should also identify and analyze weaknesses of the minor events and near misses in order to prevent occurrence of significant events. The purpose of this article is to present part of the Krsko NPP Operating Experience Program regarding to industry events. It will describe the methodology for receiving, processing, screening, reviewing, evaluating, status reporting, defining and implementing preventive/corrective actions in response to operating experience information of the events occurring off-site.(author).

  10. Cernavoda NPP simulator - next generation

    International Nuclear Information System (INIS)

    Tatar, F.; Ionescu, T.; Dascalu, M.

    2003-01-01

    Demand for extending the amount of training and scope for Cernavoda Unit 1 as well as the new trend in the simulator owners world, led to a change in the Romanian philosophy of simulator specification. Up to now the training was conducted on a Full Scope simulator, a 1:1 replica of Cernavoda Unit 1 reference plant. The present task is to define the simulation facilities and structure capable to meet the requirements for training, qualification and licensing of personnel for both Cernavoda Unit 1 and Unit 2. Obviously, the Cernavoda Unit 2 belongs to the same technological family but has rather different control room layout. Since this target requires a new simulator the costs would be rather high in accordance to the degree of automation of Cernavoda NPP. Therefore, depending on training requirements and financing, the Cernavoda Unit 1 simulator modernization, which also provides an alternative to full scope control room simulator, may be a viable option. Therefore the solution that with discuss for Cernavoda training extension is the migration of Cernavoda Unit 1 simulator to state-of-the-art. Consequently, the Cernavoda Unit 1 simulator modernization task will be organized as project including the following major items: 1. Rehost existing U1 simulation software from VAX 4500 to: - Best commercial multi-processor server for simulation server (HP, O/S Linux); - Best commercial single processor PC for I/O communications (HP, O/S Linux); 2. Replace DCC with enhanced emulated version: Best commercial individual PC for DCC emulation (HP, O/S Windows); Support for actual keyboards; Replacement of RAMTEK System and CONRAC Monitors with X terminals or PC's; 3. Conversion of AutoCAD-based panel graphic pages to RAVE-based; 4. Install the required software tools for developing enhanced simulation modules; 5. Replace the simulation modules with advanced modules; 6. Replace the present Windows Instructor Facilities with ISIS; 7. Development of a selection of MCR-U1 virtual

  11. Radiation monitoring in the NPP environment, control of radioactivity in NPP-environment system

    International Nuclear Information System (INIS)

    Egorov, Yu.A.

    1987-01-01

    Problems of radiation monitoring and control of the NPP-environment system (NPPES) are considered. Radiation control system at the NPP and in the environment provides for the control of the NPP, considered as the source of radioactive releases in the environment and for the environmental radiation climate control. It is shown, that the radiation control of the NPP-environment system must be based on the ecological normalization principles of the NPP environmental impacts. Ecological normalization should be individual for the NPP region of each ecosystem. The necessity to organize and conduct radiation ecological monitoring in the NPP regions is pointed out. Radiation ecological monitoring will provide for both environmental current radiation control and information for mathematical models, used in the NPPES radiation control

  12. Safety culture in Ignalina NPP, regulatory view

    International Nuclear Information System (INIS)

    Maksimovas, G.

    1997-01-01

    The presentation describes how success on the way to a high level Safety Culture in Ignalina NPP may be achieved by daily, well motivated activities with good attitude and proper management participation, ensuring the development and proper implementation of Safety Culture principles within the activities of Operational organization of Ignalina NPP

  13. Methodic issues of NPP personnel professional selection

    International Nuclear Information System (INIS)

    Kuznetsova, Zh.Ya.

    1983-01-01

    Basic methodic principles related to the NPP personnel selection are considered. Suggestions on the selection organization are given as well as some psycho-physiological methods of the personnel professional fitness estimating. The personnel distribution over the working places with respect to psycho-phisiological abilities has been shown to represent a way to improvement of NPP radiation safety [ru

  14. NPP Bohunice experience with ASSET services

    International Nuclear Information System (INIS)

    Klimo, J.

    1996-01-01

    The general description of Bohunice NPP ASSET experience history was given at the last annual workshop in 1995. In my short presentation I would like to pay attention to the progress in this area which was achieved at our NPP during the last year. (author)

  15. Barsebaeck NPP in Sweden - Decommissioning Project

    International Nuclear Information System (INIS)

    Hakan, Lorentz

    2009-01-01

    Barsebaeck 1 and 2, type BWR (Boiling Water Reactor) with a capacity of 615 MWe was closed down permanently on 30 November 1999 respective 31 May 2005 due to political decision. Both units together have been in Service operation (Care and maintenance) since 1 December 2006. Barsebaeck NPP will stay in Service operation until beginning of 2018 when Dismantling operation begins with the aim of a free-realized site in the beginning of 2025. That means that the remaining buildings, including equipment should be declared free-released or dismantled. It would then be up to the owner, E.ON Kaernkraft Sverige AB (EKS) to decide what is to be done with the site in the future. There was a re-organisation at Barsebaeck Kraft AB (BKAB) in 1 January 2007 and the company is organised in the following areas of function: site service operation, decommissioning planning, new business and BO replacement. The Organisation at BKAB has gone down from 450 during operation of Barsebaeck 1 and 2 to 50 employees (2009-01-01) involved in Service operation of both units. But still there are in total 250 persons placed at Barsebaeck NPP with different kinds of job assignments. A lot of activities have been carried out since 2000 and up to now for example: - All nuclear fuel has been transported away to interim storage at CLAB in Oskarshamn. - BKAB have built up contact nets and competence by taking part in different kinds of national and international organisations (SKB, IAEA, OECD/NEA TAG, WNA, ENISS, WANO, EPRI etc) commissions. - The Electrical and operational systems have been rebuilt for the actual demands and requirements for the Service operation. - The central control room is unattended since 17 December 2007 and the supervision of the Service operation is handled by a system of VDI (duty engineers) and LOP (alarm operators). - Full system decontamination on unit 1 and 2. Barsebaeck's approach today and for the future dismantling are: - Safer; - Faster; - Cost effective. BKAB

  16. Almaraz I and II NPP

    International Nuclear Information System (INIS)

    Bernaldo de Quiros, J. M.

    2005-01-01

    At the beginning of the year, both Units were connected to the grid and operating stably at 100% power. During 2004, 16,351 million kWh were generated, which is the highest gross annual production ever achieved in Almaraz NPP. Between the two units the year's accumulated unit capability factor was greater than 95.5% (99.89%in Unit I and 91.48% in Unit II). The operating factor was 100% in Unit I and 92.01% in Unit II. As the operating factor indicates, Unit I remained online without interruption throughout the entire year and operated stably from the beginning of its seventeenth operating cycle (october 27, 2003). Unit I generated a total of 8,522 million kWh, which is the highest ever per-unit annual gross production in Almaraz NPP. Unit II generated a total of 7,830 million kWh, it had a planned shutdown in January to replace one of the main transformers (phase S), and the fifteenth refueling outage took place in October. The gross electric energy accumulated at source is 155.957 million kWh in Unit I and 150,937 million kWh in Unit II. At year end both Units were operating at 100% power, with Unit I supplying 980 MWe and Unit II 985 MWe II. (Author)

  17. Does climate directly influence NPP globally?

    Science.gov (United States)

    Chu, Chengjin; Bartlett, Megan; Wang, Youshi; He, Fangliang; Weiner, Jacob; Chave, Jérôme; Sack, Lawren

    2016-01-01

    The need for rigorous analyses of climate impacts has never been more crucial. Current textbooks state that climate directly influences ecosystem annual net primary productivity (NPP), emphasizing the urgent need to monitor the impacts of climate change. A recent paper challenged this consensus, arguing, based on an analysis of NPP for 1247 woody plant communities across global climate gradients, that temperature and precipitation have negligible direct effects on NPP and only perhaps have indirect effects by constraining total stand biomass (Mtot ) and stand age (a). The authors of that study concluded that the length of the growing season (lgs ) might have a minor influence on NPP, an effect they considered not to be directly related to climate. In this article, we describe flaws that affected that study's conclusions and present novel analyses to disentangle the effects of stand variables and climate in determining NPP. We re-analyzed the same database to partition the direct and indirect effects of climate on NPP, using three approaches: maximum-likelihood model selection, independent-effects analysis, and structural equation modeling. These new analyses showed that about half of the global variation in NPP could be explained by Mtot combined with climate variables and supported strong and direct influences of climate independently of Mtot , both for NPP and for net biomass change averaged across the known lifetime of the stands (ABC = average biomass change). We show that lgs is an important climate variable, intrinsically correlated with, and contributing to mean annual temperature and precipitation (Tann and Pann ), all important climatic drivers of NPP. Our analyses provide guidance for statistical and mechanistic analyses of climate drivers of ecosystem processes for predictive modeling and provide novel evidence supporting the strong, direct role of climate in determining vegetation productivity at the global scale. © 2015 John Wiley & Sons Ltd.

  18. Planning, conduct and principal features of NPP emergency exercises in Switzerland

    International Nuclear Information System (INIS)

    Baggenstos, M.

    1993-01-01

    Emergency exercises for each NPP are required on a regular basis by the Swiss Nuclear Safety Inspectorate. The purpose of such exercises is to train the NPP staff and the on-site emergency organization in the application of the emergency procedures and the cooperation with off-site emergency teams and public authorities. The paper discusses the purpose of the emergency exercises and experiences made especially with bilateral exercises. The responsibilities for the preparation and execution of the different emergency exercises in Switzerland are explained

  19. Inspection Qualification Centre in NPP 'Kozloduy'

    International Nuclear Information System (INIS)

    Mikhovski, M.

    2000-01-01

    In May 1999 according to the working plan of the IAEA project RER 4/020 and the decision of the NPP the Inspection Qualification Centre (IQC) has been established in order to provide examination services in the NPP. During year 1999 IVC (AEA Technology) in the framework of the DTI project provides consulting and technical assistance to the NPP, IQC, Bulgarian Academy of Sciences and Regulatory Authorities in setting up the IQC infrastructure. Now IQC work as an independent inspection body B type. The IQC activities for the period 1999-2000 are presented and further tasks are outlined

  20. Improved technical specifications for Korean NPP

    International Nuclear Information System (INIS)

    Ryu, J. D.; Lee, D. H.; Seong, C. K.

    2002-01-01

    PWRs use Technical Specifications(Tech. Spec.) to ensure safe operation of the plant. Recently, many efforts were made to improve Tech. Spec. and as a result, Improved Standard Technical Specifications(ISTS) have been developed. Korean NPP technical specifications were converted to ISTS format. KAERI also provided supporting documents for technical specification conversion including mark-up's and description of changes. This paper describes and summarizes the results of implementation of ISTS for Korean NPP. The new Tech. Spec. will improve safety of Korean NPP

  1. Full scale dynamic testing of Kozloduy NPP unit 5 structures

    International Nuclear Information System (INIS)

    Da Rin, E.M.

    1999-01-01

    As described in this report, the Kozloduy NPP western site has been subjected to low level earthquake-like ground shaking - through appropriately devised underground explosions - and the resulting dynamic response of the NPP reactor Unit 5 important structures appropriately measured and digitally recorded. In-situ free-field response was measured concurrently more than 100 m aside the main structures of interest. The collected experimental data provide reference information on the actual dynamic characteristics of the Kozloduy NPPs main structures, as well as give some useful indications on the dynamic soil-structure interaction effects for the case of low level excitation. Performing the present full-scale dynamic structural testing activities took advantage of the experience gained by ISMES during similar tests, lately performed in Italy and abroad (in particular, at the Paks NPP in 1994). The IAEA promoted dynamic testing of the Kozloduy NPP Unit 5 by means of pertinently designed buried explosion-induced ground motions which has provided a large amount of data on the dynamic structural response of its major structures. In the present report, the conducted investigation is described and the acquired digital data presented. A series of preliminary analyses were undertaken for examining in detail the ground excitation levels that were produced by these weak earthquake simulation experiments, as well as for inferring some structural characteristics and behaviour information from the collected data. These analyses ascertained the high quality of the collected digital data. Presumably due to soil-structure dynamic interaction effects, reduced excitation levels were observed at the reactor building foundation raft level with respect to the concurrent free-field ground motions. measured at a 140 m distance from the reactor building centre. Further more detailed and systematic analyses are worthwhile to be performed for extracting more complete information about the

  2. Site selection for nuclear power plants

    International Nuclear Information System (INIS)

    Ehjchkholz, D.

    1980-01-01

    Problem of NPP site selection in the USA including engineering factors, radiation and environmental protection factors is stated in detail. Floating and underground sites are considered especially. The attention in paid to waste storage and risk criterium in siting [ru

  3. Integrated risk assessment for multi-unit NPP sites—A comparison

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, C. Senthil, E-mail: cskumar@igcar.gov.in [AERB-Safety Research Institute, Kalpakkam (India); Hassija, Varun; Velusamy, K. [Reactor Design Group, Indira Gandhi Centre for Atomic Research, Kalpakkam (India); Balasubramaniyan, V. [AERB-Safety Research Institute, Kalpakkam (India)

    2015-11-15

    Highlights: • Framework for integrated risk assessment for multi-unit NPP sites. • Categorization of external and internal events. • Modelling of key issues: mission time, cliff-edge, common cause failures, etc. • Safety goals for multi-unit NPP sites. • Comparison of site core damage frequency in one, two, three and four unit sites. - Abstract: Most of the nuclear power producing sites in the world houses multiple units. Such sites are faced with hazards generated from external events: earthquake, tsunami, flood, etc. and can threaten the safety of nuclear power plants. Further, risk from a multiple unit site and its impact on the public and environment was evident during the Fukushima nuclear disaster in March 2011. It is therefore important to evolve a methodology to systematically assess the risk from multi-unit site. For a single unit site, probabilistic risk assessment technique identifies the potential accident scenarios, their consequences, and estimates the core damage frequency that arise due to internal and external hazards. This challenging task becomes even more complex for a multiple unit site, especially when the external hazards that has the potential to generate one or more correlated hazards or a combination of non-correlated hazards are to be modelled. This paper presents an approach to evaluate risk for multiple NPP sites and also compare the risk for sites housing single, double and multiple nuclear plants.

  4. Integrated risk assessment for multi-unit NPP sites—A comparison

    International Nuclear Information System (INIS)

    Kumar, C. Senthil; Hassija, Varun; Velusamy, K.; Balasubramaniyan, V.

    2015-01-01

    Highlights: • Framework for integrated risk assessment for multi-unit NPP sites. • Categorization of external and internal events. • Modelling of key issues: mission time, cliff-edge, common cause failures, etc. • Safety goals for multi-unit NPP sites. • Comparison of site core damage frequency in one, two, three and four unit sites. - Abstract: Most of the nuclear power producing sites in the world houses multiple units. Such sites are faced with hazards generated from external events: earthquake, tsunami, flood, etc. and can threaten the safety of nuclear power plants. Further, risk from a multiple unit site and its impact on the public and environment was evident during the Fukushima nuclear disaster in March 2011. It is therefore important to evolve a methodology to systematically assess the risk from multi-unit site. For a single unit site, probabilistic risk assessment technique identifies the potential accident scenarios, their consequences, and estimates the core damage frequency that arise due to internal and external hazards. This challenging task becomes even more complex for a multiple unit site, especially when the external hazards that has the potential to generate one or more correlated hazards or a combination of non-correlated hazards are to be modelled. This paper presents an approach to evaluate risk for multiple NPP sites and also compare the risk for sites housing single, double and multiple nuclear plants.

  5. On-line maintenance at Cofrentes NPP

    International Nuclear Information System (INIS)

    Suarez, J.; Moreno, M.

    2000-01-01

    Cofrentes NPP (CNPP) has developed a Level 1 PSA with the following scope: analysis of internal events, with the reactor initially operating at power; internal and external flooding risk analysis; internal fire risk analysis; reliability analysis of the containment heat removal and containment isolation systems. Level 1 CNPP-PSA results reveal that total core damage frequency in CNPP is less than other similar BWR/6 plants. The CNPP-PSA related activities and applications being carried out currently are: prioritization of motor operated valves related to GL-89/10; complementary analysis for exemption to some 10CFR50 App. J requirements; Q-List grading; risk-informed IST program; reliability-centered maintenance; maintenance rule support; on-line maintenance support; off-line risk-monitor development; PSA applicability to the 10CFR50 App. R requirements, analysis of the frequency of miss-oriented fuel bundle event, adjusting of MAAP 3.0B, revision 10, on VAX and PC; acquisition of MAAP 4; development of Level1/Level2-PSA interface; seismic site categorization for the IPEEE; etc. (author)

  6. Radiation ecological monitoring in NPP region

    International Nuclear Information System (INIS)

    Egorov, Yu.A.; Kazakov, S.V.

    1985-01-01

    The known principle of sanitary-hygienic regulation of NPP radiation effect on man and environment is analyzed. An ecological approach is required to optimize NPP relations with the environment and to regulate radioactivity of the NPP - environment system. The ecological approach envisages the development of standards of permissible concentrations of radioactive and chemical substances (as well as heat) in natural environment, taking into account their synergism, corresponding to ecologically permissible response reactions of biota to their effect. The ecological approach also comprises the sanitary-hygienic principle of radiation protection of man. Attention is paid to ecological monitoring in NPP region, comprising consideration of factors, affecting the environment, evaluation of the actual state of the environment, prediction of the environmental state, evaluation of the expected environmental state

  7. Nuclear Power Plant (NPP) safety in Brazil

    International Nuclear Information System (INIS)

    Lederman, L.

    1980-01-01

    The multidisciplinary aspects of the activities involved in the nuclear power plant (NPP) licensing, are presented. The activities of CNEN's technical staff in the licensing of Angra-1 and Angra-2 power plants are shown. (E.G.) [pt

  8. Environmental impact assessment of NPP decommissioning

    International Nuclear Information System (INIS)

    Hinca, R.

    2009-01-01

    In this presentation the following potential impacts of decommissioning of NPP are discussed: - Impacts on population; Impacts on natural environment; Land impacts; Impacts on urban complex and land utilisation; Possible impacts on area as a result of failure.

  9. NPP A-1 decommissioning - Phase I

    International Nuclear Information System (INIS)

    Krstenik, A.; Blazek, J.

    2000-01-01

    Nuclear power plant A-1 with output 150 MW e , with metallic natural uranium fuelled, CO 2 cooled and heavy water moderated reactor had been prematurely finally shut down in 1977. It is necessary to mention that neither operator nor regulatory and other authorities have been prepared for the solution of such situation. During next two consecutive years after shutdown main effort of operator focused on technical and administrative activities which are described in the previous paper together with approach, condition and constraints for NPP A-1 decommissioning as well as the work and research carried out up to the development and approval of the Project for NPP A-1 decommissioning - I. phase. Subject of this paper is description of: (1) An approach to NPP A -1 decommissioning; (2) An approach to development of the project for NPP A-1 decommissioning; (3) Project - tasks, scope, objectives; (4) Mode of the Project realisation; (5) Progress achieved up to the 1999 year. (authors)

  10. Knowledge Management and Organizational Proficiency with NPP

    International Nuclear Information System (INIS)

    Marler, M.

    2016-01-01

    Full text: The pace of new NPP construction, startup, and operation is straining the supply of proficient operators, technicians, and engineers. This technical brief explains an approach implemented by a US nuclear utility to capture and transfer knowledge possessed by proficient workers to new workers using the VISION learning content management system. This approach could also be used to accelerate worker proficiency in new NPP organizations. (author

  11. Ignalina NPP Safety Analysis: Models and Results

    International Nuclear Information System (INIS)

    Uspuras, E.

    1999-01-01

    Research directions, linked to safety assessment of the Ignalina NPP, of the scientific safety analysis group are presented: Thermal-hydraulic analysis of accidents and operational transients; Thermal-hydraulic assessment of Ignalina NPP Accident Localization System and other compartments; Structural analysis of plant components, piping and other parts of Main Circulation Circuit; Assessment of RBMK-1500 reactor core and other. Models and main works carried out last year are described. (author)

  12. Training human resource for NPP in Vietnam

    International Nuclear Information System (INIS)

    Nguyen, Trung Tinh; Dam, Xuan Hiep

    2008-01-01

    Vietnam will establish the first NPP in the near future. With us the first important thing is the human resource, but now there is no university in Vietnam training nuclear engineers. In EPU (Electric Power University), now we are preparing for training nuclear engineers. In this paper, we review the nuclear man power and the way to train the high quality human resource for NPP and for other nuclear application in Vietnam. (author)

  13. ALARA and radiation protection optimization status of Cernavoda NPP

    International Nuclear Information System (INIS)

    Hau, D.I.

    2000-01-01

    ALARA in Radiation Protection is specifically applied as a tool in lowering B the risk of high exposure when performing necessary activities by reducing the doses as much and as reasonably possible. Is ALARA also a matter of IMAGE? ALARA is one of the main aspects that contributes to forming the image of a certain facility. Many experiences in the world show a decrease in the collective dose per station after proper ALARA implementation. This trend is more relevant for 'adult' nuclear sites. At Cernavoda NPP the authorization process itself included implementation of an effective ALARA program. (author)

  14. Study on increasing spent fuel storage capacity at Juragua NPP

    International Nuclear Information System (INIS)

    Guerra Valdes, R.; Lopez Aldama, D.; Rodriguez Gual, M.; Garcia Yip, F.

    1999-01-01

    The delay in decision about the final disposal of the spent fuel, led to longer interim storage. The reracking og the storage pools was an economical and feasible option to increase the storage capacity on the site. Reracking of the storage facility led to the analysis of the new conditions for criticality, shielding, residual heat removal and mechanical loads over the structures. This paper includes a summary of the studies on criticality and dose rate changes in the vicinity of the storage pool of Juragua NPP

  15. Vandellos 1 NPP decommissioning feedback experience

    International Nuclear Information System (INIS)

    Fernandez, Rodriguez A.

    2003-01-01

    The Vandellos 1 Nuclear Power Plant (CNV1) is located on the Mediterranean coast in the province of Tarragona (Spain). The Plant is of the European Natural Uranium Graphite-Gas type. The thermal power of the plant amounts to 1,670 MWt, its electrical output being 500 Mwe. The Plant started-up commercial service in May 1972; its final shutdown, due to a fire in the turbines, occurred in October 1989, after 17 years of operation with an accumulated energy production of 55,647 GWh. The option of decommissioning accepted by the Ministry of Industry, consists of first removing the spent fuel and conditioning the operating radioactive wastes, and then undertaking dismantling of almost all the structures and components located outside the reactor vessel, except those ensuring confinement of the vessel itself and the safety and surveillance of the facility and site. No action will be taken with respect to the vessel, in which the reactor will remain confined without nuclear fuel and with its internal components intact until completion of the waiting (dormancy) period. The site itself will be kept under surveillance during dormancy phase, following partial clearance, the remaining installations being left within the new site perimeter in a situation of monitored confinement. Following the dormancy period, which will last some 30 years, total dismantling of the remaining installations will be undertaken, this implying subsequent complete clearance of the site. The project was started in November of 1992, and the works on site began in 1998. The safe enclosure consists only in the reactor pressure vessel, which will be left on site. The activity content of the vessel is about 100 000 Ci, mostly Co 60. Part of the Stage 2 concept is the total static isolation of this vessel. The vessel has 1 700 penetrations, the pipes of which were cut, seal-welded and inspected. After five years of works in Vandellos 1 NPP decommissioning, ENRESA has an experience and knowledge, that is

  16. Grassland Production Change Due Comparison of NPP Estimates by Theoretical Model and Satellite Data from MODIS

    Science.gov (United States)

    Campbell, E. E.; Oliveira, J. D. C.; Lamparelli, R.; Soares, J.; Monteiro, L. A.; Jaiswal, D.; Sheehan, J. J.; Figueiredo, G. K. D. A.; Lynd, L. R.

    2017-12-01

    Accessing the changes in net primary production (NPP) from grassland in the globe has important applications, e.g. can identify where land have been degraded or in opposite site have been intensified. The aim of this study is to identify the changes occurred in grassland production due management practices and climate change. A recent comparison between a theoretical model of aboveground NPP and satellite data will be performed for the years 2000 to 2003. The theoretical model links NPP to climate, defined as total annual rainfall. Satellite data will use the total annual NPP from MODIS sensor (MOD17A3), that each pixel (spatial resolution of 1 km) include biome type information, daily meteorological data and the fraction absorbed of photosynthetic active radiation (FPAR) and leaf area index (LAI). Both NPP results were set in pastureland that is occupied by ruminants based on year 2000. The correlation between total NPP's values on year 2000 was 0.77. Therefore, the change in the differences between these models can reflect management practices and climate change impacts on grassland biomass production and also the reasonability of using both databases for predicting yield gap. The different from both NPP estimates will be then classified in three groups: no significant difference, significant increase and significant decrease. The outcome results will show the fluctuations in biomass from grassland worldwide. The regions with ongoing pasture degradation will be indentified, and can suggest a need for improvement. In the other hand, pastureland with significant increase in biomass will offer an example of intensification potential. The tendency of the pastureland in each region can give a support for policy makers in order to achieve a sustainability use of the land. Financial Support: FAPESP process 2017/06037-4, 2016/08741-8, 2017/08970-0, 2016/08742-4 and 2014/26767-9

  17. Status of new NPP program in US and the challenges ahead

    International Nuclear Information System (INIS)

    Choi, Han Kwon; Mulligan, Jack

    2009-01-01

    US Energy Policy Act of 2005 and DOE 2010 Initiative, combined with global warming and recent surging prices of natural gas and oil have contributed to an environment conducive to a resurgence in new NPP construction in the US, so called 'Nuclear Renaissance'. This pro nuclear environment is further supported by development of simplified NPP designs with enhanced safety features, perceived predictability in licensing, and improved NPP performance. In 2008, a number of potential NPP owners have docketed their application for early site permits and combined operating licenses (COL) under 10CFR52. Also, over the past several years, there has been continuous involvement of US nuclear industry in the development of GEN IV reactors, such as GNEP and NGNP with its target date for the initial deployment of demonstration plants around the year 2021. On the other hand, since the last few ordered in 1973 and the last few completed in the early 1990's, US nuclear industry markets were not large enough to maintain the number of engineers, manufacturers and construction managers and crafts employed during the heyday of new NPP construction during the 1970's and 80's. Many in the aging workforce have refired. Further, as opportunities for young graduates for nuclear work were fairly limited, many universities have maintained their nuclear QA certifications. Not only must US industry deal with this dearth of capability, but with the notable exception of the ABWRs, almost every NPP will be essentially a first of a kind plant. This paper will try to update the on going effort on new NPP construction in US and explore the challenges to the US nuclear industry noted above along with some suggestions for possible solutions

  18. Managing RTP Console Upgrading Project: Best Practice for Nuclear Malaysia as TSO in Supporting NPP Development

    International Nuclear Information System (INIS)

    Nurfarhana Ayuni Joha; Syahirah Abdul Rahman; Izhar Abu Hussin

    2011-01-01

    Human Resource Development (HRD) is required for Nuclear Power Programme (NPP). To be a Technical Support Organisation (TSO) for NPP, Nuclear Malaysia should be ready to take the responsibility in supporting Nuclear Regulatory Agency (NRA) and NPP Operators. In nurturing Nuclear Malaysia as TSO, the prime important and focus of HRD for the NPP is the reactor engineering technology. Nuclear Malaysia gives various phases of supports needed to build NPP such as during siting, design, planning, licensing, construction, commissioning, operation and maintenance in its own way and capability. The current Nuclear Malaysia unique approach is the TRIGA PUSPATI reactor (RTP) upgrading project. Research reactor plays an important role in Research and Developpement organization as a nuclear facility to assist the development of NPP. Therefore, upgrading the research reactor is needed to build the skills and gain knowledge of workers to work safely. After 29 years of operation, the RTP system is facing aging problems due to many components in the reactor are outdated. Therefore, immediate action should be carried out to mitigate the aging factor of the reactor to prevent the worsening of the aging problem, and to prevent untoward incident from happening. Action should also cover short and long term planning to prevent current situation from recurring. Currently, RTP is upgrading its console from analog to digital system. One of the achievements in this console upgrading project is the development and implementation of project management. This paper comprises the overview on the RTP console upgrading project, the project management and how this project can lead Nuclear Malaysia to be a good TSO for the development of NPP. (author)

  19. Methodology transfer for the preparation of NPP decommissioning for leading personnel of the Ignalina NPP and for the representatives of Lithuanian authorities

    International Nuclear Information System (INIS)

    Ackermann, L.; Baecker, A.

    2004-01-01

    At request of the Lithuanian government to receive support for the preparation of the decommissioning of Ignalina NPP, a bilateral project was financed by the German federal government to transfer experience from the decommissioning of the Greifswald and Rheinsberg NPPs to the management staff of the Ignalina NPP and to the representatives of the Lithuanian authorities in charge of the decommissioning. The methodology transfer project was prepared and carried out under the leadership of the Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH. The practical implementation was within the responsibility of Energiewerke Nord GmbH (EWN) in cooperation with other German subcontractors. The methodology transfer comprised the task fields of project management, project planning, licensing procedure and waste management as well as social aspects of the further development of the industrial site. Five intensive one-week seminars were conducted mainly at the Greifswald NPP site and the knowledge gained was then consolidated in two evaluation seminars at the Ignalina NPP. As the basis for the training realised in 2002 and 2003, EWN provided about 2000 power-point illustrations, more than 200 transparencies and four video films. The training handouts produced by EWN were delivered to the seminar participants in Russian and English language and documented in the database ''Technische Dokumentation Ost'' (DOKU OST) of GRS. (orig.)

  20. Decommissioning study of Forsmark NPP

    International Nuclear Information System (INIS)

    Anunti, Aake; Larsson, Helena; Edelborg, Mathias

    2013-06-01

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for the Forsmark NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding

  1. Decommissioning Study of Oskarshamn NPP

    International Nuclear Information System (INIS)

    Larsson, Helena; Anunti, Aake; Edelborg, Mathias

    2013-06-01

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for Oskarshamn NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding

  2. Decommissioning study of Forsmark NPP

    Energy Technology Data Exchange (ETDEWEB)

    Anunti, Aake; Larsson, Helena; Edelborg, Mathias [Westinghouse Electric Sweden AB, Vaesteraas (Sweden)

    2013-06-15

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for the Forsmark NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding.

  3. Decommissioning Study of Oskarshamn NPP

    Energy Technology Data Exchange (ETDEWEB)

    Larsson, Helena; Anunti, Aake; Edelborg, Mathias [Westinghouse Electric Sweden AB, Vaesteraas (Sweden)

    2013-06-15

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for Oskarshamn NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding.

  4. ORSEC technological risks, Blayais NPP

    International Nuclear Information System (INIS)

    2016-01-01

    The Particular intervention plan (PPI in French) is an emergency plan which foresees the measures and means to be implemented to address the potential risks of the presence and operation of a nuclear facility. This plan is implemented and developed by the Prefect in case of nuclear accident (or incident leading to a potential accident), the impact of which extending beyond the facility perimeter. It represents a special section of the organisation plan for civil protection response (ORSEC plan). The PPI foresees the necessary measures and means for crisis management during the first hours following the accident and is triggered by the Department Prefect according to the information provided by the facility operator. Its aim is to protect the populations leaving within 10 km of the facility against a potential radiological hazard. The PPI describes: the facility, the intervention area, the protection measures for the population, the conditions of emergency plan triggering, the crisis organisation, the action forms of the different services, and the post-accident stage. This document is the public version of the Particular intervention plan of the Blayais NPP (Gironde, France)

  5. Operation Aspect of the Main Control Room of NPP

    International Nuclear Information System (INIS)

    Sahala M Lumbanraja

    2009-01-01

    The main control room of Nuclear Power Plant (NPP) is operational centre to control all of the operation activity of NPP. NPP must be operated carefully and safely. Many aspect that contributed to operation of NPP, such as man power whose operated, technology type used, ergonomic of main control room, operational management, etc. The disturbances of communication in control room must be anticipated so the high availability of NPP can be achieved. The ergonomic of the NPP control room that will be used in Indonesia must be designed suitable to anthropometric of Indonesia society. (author)

  6. MODIS GPP/NPP for complex land use area: a case study of comparison between MODIS GPP/NPP and ground-based measurements over Korea

    Science.gov (United States)

    Shim, C.

    2013-12-01

    The Moderate Resolution Imaging Radiometer (MODIS) Gross Primary Productivity (GPP)/Net Primary Productivity (NPP) has been widely used for the study on global terrestrial ecosystem and carbon cycle. The current MODIS product with ~ 1 km spatial resolution, however, has limitation on the information on local scale environment (measurements and MODIS retrievals were simultaneously available and the land classification of sites agreed the forest type map (~71m) (1 site over Gwangneung flux tower (GDK) for 2006-2008 and 2 sites of ground measurements over Cheongju (CJ1 and CJ2) for 2011). The MODIS GPP are comparable to that of GDK (largely deciduous forest) within -6.3 ~ +2.3% of bias (-104.5 - 37.9 gCm-2yr-1). While the MODIS NPP of CJ1 at Cheongju (largely Larix leptolepis) underestimated NPP by 34% (-224.5 gCm-2yr-1), the MODIS NPP of CJ2 (largely Pinus densiflora) agreed well with -0.2% of bias (1.6 gCm-2yr-1). The fairly comparable values of the MODIS here however, cannot assure the quality of the MOD17 over the complex vegetation area of Korea since the ground measurements except the eddy covariance tower flux measurements are highly inconsistent. Therefore, the comprehensive experiments to represents GPP/NPP over diverse vegetation types for a comparable scale of MODIS with a consistent measurement technique are necessary in order to evaluate the MODIS vegetation productivity data over Korea, which contains a large portion of highly heterogeneous vegetation area.

  7. Changing NPP consumption patterns in the Holocene: from Megafauna "liberated" NPP to "ecological bankruptcy"

    Science.gov (United States)

    Doughty, C.

    2015-12-01

    There have been vast changes in how net primary production (NPP) is consumed by humans and animals during the Holocene beginning with a potential increase in availability following the Pleistocene megafauna extinctions. This was followed by the development of agriculture which began to gradually restrict availability of NPP for wild animals. Finally, humans entered the industrial era using non-plant based energies to power societies. Here I ask the following questions about these three energy transitions: 1. How much NPP energy may have become available following the megafauna extinctions? 2. When did humans, through agriculture and domestic animals, consume more NPP than wild mammals in each country? 3. When did humans and wild mammals use more energy than was available in total NPP in each country? To answer this last question I calculate NPP consumed by wild animals, crops, livestock, and energy use (all converted to units of MJ) and compare this with the total potential NPP (also in MJ) for each country. We develop the term "ecological bankruptcy" to refer to the level of consumption where not all energy needs can be met by the country's NPP. Currently, 82 countries and a net population of 5.4 billion are in the state of ecologically bankruptcy, crossing this threshold at various times over the past 40 years. By contrast, only 52 countries with a net population of 1.2 billion remain ecologically solvent. Overall, the Holocene has seen remarkable changes in consumption patterns of NPP, passing through three distinct phases. Humans began in a world where there was 1.6-4.1% unclaimed NPP to consume. From 1700-1850, humans began to consume more than wild animals (globally averaged). At present, >82% of people live in countries where not even all available plant matter could satisfy our energy demands.

  8. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  9. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  10. Local network deployed around the Kozloduy NPP - a useful tool for seismological monitoring

    Science.gov (United States)

    Solakov, Dimcho; Simeonova, Stela; Dimitrova, Liliya; Slavcheva, Krasimira; Raykova, Plamena; Popova, Maria; Georgiev, Ivan

    2015-04-01

    Radiation risks may transcend national borders, and international cooperation serves to promote and enhance safety globally by exchanging experience and by improving capabilities to control hazards, to prevent accidents, to respond to emergencies and to mitigate any harmful consequences. International safety standards provide support for states in meeting their obligations under general principles of international law, such as those relating to environmental protection. Seismic safety is a key element of NPP safe operation. Safety and security measures have in common the aim of protecting human life and health and the environment. The Kozloduy NPP site is located in the stable part of the Moesian platform (area of about 50000 km2). From seismological point of view the Moesian platform is the most quite area on the territory of Bulgaria. There are neither historical nor instrumental earthquakes with M>4.5 occurred within the platform. The near region (area with radial extent of 30 km) of the NPP site is characterized with very low seismic activity. The strongest recorded quake is the 1987 earthquake МS=3.6, localized 22 km northwest of the Kozloduy NPP site on the territory of Romania. In line with international practice, the geological, geophysical and seismological characteristics of the region around the site have been investigated for the purpose of evaluating the seismic hazards at the NPP site. A local network (LSN) of sensitive seismographs having a recording capability for micro-earthquakes have been installed around Kozloduy NPP and operated since 1997. The operation and data processing, data interpretation, and reporting of the local micro-earthquake network are linked to the national seismic network (NOTSSI). A real-time data transfer from stations to National Data Center (in Sofia) was implemented using the VPN and MAN networks of the Bulgarian Telecommunication. Real-time and interactive data processing are performed by the Seismic Network Data

  11. Differences in the licensing requirements for Cernavoda NPP Unit 2 as compared to Cernavoda Unit 1

    International Nuclear Information System (INIS)

    Rotaru, Ioan; Dina, Dumitru; Ghita, Sorin; Stefanescu, Petre

    2000-01-01

    The main stages of Cernavoda NPP Unit 1 and Unit 2 licensing process, according to CNCAN (National Commission for Nuclear Activities) requirements, are presented comparatively. The differences occur for the following licenses: - site license; - construction license; - PIF license, regarding the loading of D 2 O in the moderator and primary circuits, fuel loading, first criticality, power increase; - trial operating license; - operating license. The paper addresses the following items: steps in licensing and the Unit 1 corresponding documentation; - the process of Unit 2 licensing; - requirements to designer; - updating the nuclear safety guides; - editing codes, guides and reference standards and implications on NPP design; - NPP behavior during severe accidents (beyond the design accident consequence); - level 2 and 3 PSA issuing prior to operation licensing; - fulfilling ISO 9000 standard by equipment components already manufactured; improving the warning/display systems in the control room

  12. Accident management insights after the Fukushima Daiichi NPP accident

    International Nuclear Information System (INIS)

    Degueldre, Didier; Viktorov, Alexandre; Tuomainen, Minna; Ducamp, Francois; Chevalier, Sophie; Guigueno, Yves; Tasset, Daniel; Heinrich, Marcus; Schneider, Matthias; Funahashi, Toshihiro; Hotta, Akitoshi; Kajimoto, Mitsuhiro; Chung, Dae-Wook; Kuriene, Laima; Kozlova, Nadezhda; Zivko, Tomi; Aleza, Santiago; Jones, John; McHale, Jack; Nieh, Ho; Pascal, Ghislain; ); Nakoski, John; Neretin, Victor; Nezuka, Takayoshi; )

    2014-01-01

    The Fukushima Daiichi nuclear power plant (NPP) accident, that took place on 11 March 2011, initiated a significant number of activities at the national and international levels to reassess the safety of existing NPPs, evaluate the sufficiency of technical means and administrative measures available for emergency response, and develop recommendations for increasing the robustness of NPPs to withstand extreme external events and beyond design basis accidents. The OECD Nuclear Energy Agency (NEA) is working closely with its member and partner countries to examine the causes of the accident and to identify lessons learnt with a view to the appropriate follow-up actions to be taken by the nuclear safety community. Accident management is a priority area of work for the NEA to address lessons being learnt from the accident at the Fukushima Daiichi NPP following the recommendations of Committee on Nuclear Regulatory Activities (CNRA), Committee on the Safety of Nuclear Installations (CSNI), and Committee on Radiation Protection and Public Health (CRPPH). Considering the importance of these issues, the CNRA authorised the formation of a task group on accident management (TGAM) in June 2012 to review the regulatory framework for accident management following the Fukushima Daiichi NPP accident. The task group was requested to assess the NEA member countries needs and challenges in light of the accident from a regulatory point of view. The general objectives of the TGAM review were to consider: - enhancements of on-site accident management procedures and guidelines based on lessons learnt from the Fukushima Daiichi NPP accident; - decision-making and guiding principles in emergency situations; - guidance for instrumentation, equipment and supplies for addressing long-term aspects of accident management; - guidance and implementation when taking extreme measures for accident management. The report is built on the existing bases for capabilities to respond to design basis

  13. Construction and mounting technology of NPP in France

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    Principal peculiarities of construction sequence of building 1300 MW(e) single-unit NPPs in France are described. A NPP is housed in a two-layer containment building with 1.5% leakage of medium per day. The internal shell, 900 mm thich, is made of prestressed reinforced concrete; the external shell is made of reinforced concrete. The sequence and organizing of concrete operations using concrete pumps with capacity of 50 m 3 /h, concrete distributors ensuring concrete delivery to a distance of 46 m and belt conveyers assuring 80-100 m 3 /h concrete placing are described. A concrete plant of 120-180 μ 3 /h productive capacity equipped with a system for computerized automatic programming of the mixture composition is built to provide concrete mixture for NPP construction sites. The workshops are developed at the construction site to fabricate concrete structures with specific reinforcement consumption up to 250 kg/m 3 . The reinforcement is assembled with the use of special pipe couplings, welding of reinforcement is prohibited. Enlarged reinforced concrete blocks sized up to 250 t are employed to reduce the construction terms and to improve the quality of work

  14. NPP Tropical Forest: Pasoh, Malaysia, 1971-1973, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set contains four ASCII data files (.txt format), one providing net primary production (NPP) component data and three providing climate data. The NPP...

  15. NPP Tropical Forest: Atherton, Australia, 1974-1985, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set contains eight data files (.txt format): three net primary productivity (NPP) data files and five climate data files. The NPP estimates are based on...

  16. NPP Tropical Forest: Kade, Ghana, 1957-1972, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set contains one NPP data file and two climate data files (ASCII .txt format). The NPP file contains above- and below- ground biomass, litterfall, standing...

  17. Reserves of labour content reduction in NPP construction

    International Nuclear Information System (INIS)

    Bekerman, R.E.

    1986-01-01

    Specific labour contents when constructing NPP with RBMK-1000 and WWER-1000 type reactors are presented. Factors affecting labour content of NPP construction are shown. Measures aimed at labour content decrease are suggested

  18. ISLSCP II IGBP NPP Output from Terrestrial Biogeochemistry Models

    Data.gov (United States)

    National Aeronautics and Space Administration — ABSTRACT: This data set contains modeled annual net primary production (NPP) for the land biosphere from seventeen different global models. Annual NPP is defined as...

  19. ISLSCP II IGBP NPP Output from Terrestrial Biogeochemistry Models

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set contains modeled annual net primary production (NPP) for the land biosphere from seventeen different global models. Annual NPP is defined as the net...

  20. New trends in designing NPP control boards

    International Nuclear Information System (INIS)

    Kondrat'ev, V.V.

    1981-01-01

    A short analytical summary of the latest developments and future trends in designing NPP control boards is given. The designs of the Westinghause and the Hynkley-Point NPP control boards are described in detail. The essence of the advanced control board concept consists , firstly, in expanded use of computer-controlled displays for the sake of reducing the content of unimportant information presented to an operator, and, secondary, in better account of human possibilities to convert the NPP operation information into a more suitable form. An enlarged use of the direct digital reactor control utilizing microprocessors is expected. Besides, the employment of full-scale control board mock-ups and information desks as well as testing newly-developed control boards at computer reactor simulators are concluded to be used at all-growing rate [ru

  1. Qinshan NPP large break LOCA safety analysis

    International Nuclear Information System (INIS)

    Shi Guobao; Tang Jiahuan; Zhou Quanfu; Wang Yangding

    1997-01-01

    Qinshan NPP is the first nuclear power plant in the mainland of China, a 300 MW(e) two-loop PWR. Large break LOCA is the design-basis accident of Qinshan NPP. Based on available computer codes, the own analysis method which complies with Appendix k of 10 CFR 50 has been established. The RELAP4/MOD7 code is employed for the calculations of blowdown, refill and reflood phase of the RCS respectively. The CONTEMPT-LT/028 code is used for the containment pressure and temperature analysis. The temperature transient in the hot rod is calculated using the FRAP-6T code. Conservative initial and functional assumptions were adopted during Qinshan NPP large break LOCA analysis. The results of the analysis show the applicable acceptance criteria for the loss-of-coolant accident are met

  2. Specification of requirements to get a license for an Independent Spent Fuel Dry Storage Installation (ISFSI) at the site of the NPP-LV; Especificacion de los requerimientos para tramitar una licencia de una instalacion independiente de almacenamiento temporal en seco de combustible gastado (ISFSI) en el sitio de la CNLV

    Energy Technology Data Exchange (ETDEWEB)

    Serrano R, M. L., E-mail: mlserrano@cnsns.gob.mx [Comision Nacional de Seguridad Nuclear y Salvaguardias, Dr. Barragan 779, Col. Narvarte, 03020 Ciudad de Mexico (Mexico)

    2015-09-15

    This article describes some of the work done in the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) to define specifically the requirements that the Federal Electricity Commission (CFE) shall meet to submit for consideration of CNSNS an operation request of an Independent Spent Fuel Dry Storage Installation (ISFSI). The project of a facility of this type arose from the need to provide storage capacity for spent nuclear fuel in the nuclear power plant of Laguna Verde (NPP-LV) and to continue the operation at the same facility in a safe manner. The licensing of these facilities in the United States of America has two modes: specific license or general license. The characteristics of these licenses are described in this article. However, in Mexico the existing national legislation is not designed for such license types, in fact there is a lack of standards or regulations in this regard. The regulatory law of Article 27 of the Constitution in the nuclear matter, only generally establishes that this type of facility requires an authorization from the Ministry of Energy. For this reason and because there is not a national legislation, was necessary to use the legislation that provides the Nuclear Regulatory Commission of USA, the US NRC. However, it cannot be applied as is established, so was necessary that the CNSNS analyze one by one the requirements of both types of license and determine what would be required to NPP-LV to submit its operating license of ISFSI. The American regulatory applicable to an ISFSI, the 10-Cfr-72 of the US NRC, establishes the requirements for both types of licenses. Chapter 10-Cfr was analyzed in all its clauses and coupled to the laws, regulations and standards as well as to the requirements established by CNSNS, all associated with a store spent fuel on site; the respective certification of containers for spent fuel dry storage was not included in this article, even though the CNSNS also performed that activity under the

  3. NPP Krsko small break LOCA analysis

    International Nuclear Information System (INIS)

    Mavko, B.; Petelin, S.; Peterlin, G.

    1987-01-01

    Parametric analysis of small break loss of coolant accident for the Krsko NPP was calculated by using RELAP5/MOD1 computer code. The model that was used in our calculations has been improved over several years and was previously tested in simulation (s) of start-up tests and known NPP Krsko transients. In our calculations we modelled automatic actions initiated by control, safety and protection systems. We also modelled the required operator actions as specified in emergency operating instructions. In small-break LOCA calculations, we varied break sizes in the cold leg. The influence of steam generator tube plugging on small break LOCA accidents was also analysed. (author)

  4. Safety upgrading program in NPP Mochovce

    International Nuclear Information System (INIS)

    Baumeister, P.

    1999-01-01

    EMO interest is to operate only nuclear power plants with high standards of nuclear safety. This aim EMO declare on preparation completion and commissioning of Mochovce Nuclear Power Plant. Wide co-operation of our company with International Atomic Energy Agency and west European Inst.ions and companies has been started with aim to fulfil the nuclear safety requirements for Mochovce NPP. Set of 87 safety measures was implemented at Mochovce Unit 1 and is under construction at Unit 2. Mochovce NPP approach to safety upgrading implementation is showed on chosen measures. This presentation is focused on the issues category III.(author)

  5. Post-earthquake action plan for existing NPP

    International Nuclear Information System (INIS)

    Chandra Basu, Prabir; )

    2011-01-01

    In recent years, a number of nuclear power plants (NPP), mainly in Japan, have been affected by strong earthquakes. In some cases, the measured ground motions have exceeded the design or evaluation bases. There were cases of such earthquake experience in other countries also. The experience from these events shows that operating plants were shut down immediately following the event. In most cases, no significant damage was identified in these nuclear power plant units. Plants remained shut down for extended periods for studies, investigations and evaluations to assess their safety. In a limited number of cases, upgrades were implemented to meet a) New definitions of the design basis, or b) Requirements for beyond design basis earthquakes. The experience of the above events demonstrated the need for formulating the Post-Earthquake Action Plan (PEqAP) covering specific and detailed criteria and procedures for addressing situations where the original seismic design or evaluation bases are exceeded by actual seismic events. In response to this need, IAEA had published, Earthquake Preparedness and Response for Nuclear Power Plants, Safety Report Series No. 66 (SR 66). The seismic safety knowledge and experience of different countries from the earthquakes till 2010 were collected and disseminated through this Safety Report for providing updated guidance for the actions to be taken in preparation for, and following, a felt earthquake at NPPs. The present article highlighted salient features of the SR66. The Great East Japan Earthquake, of magnitude 9.0, on 11 March 2011 generated extreme ground motion and a large tsunami that struck the East Coast of Japan. Several nuclear power plants (NPP) at Tokai Dai-ini, Higashi Dori, Onagawa, and TEPCO's Fukushima Dai-ichi and Dai-ini, were affected. The operating units at these sites were successfully shutdown. However, the large tsunami waves that followed the ground motion challenged the safety systems of four units of Fukushima

  6. Akkuyu NPP – the first Turkish NPP. The new history of the project

    International Nuclear Information System (INIS)

    Tzocheva, V.

    2012-01-01

    An overview is given to the Turkish energy sector and nuclear power plans. The project for the construction of the first NPP in Turkey is presented. The general parameters of the Project are: CAPEX: $ 20 bln; Project design: NPP-2006; (VVER- 1200); Number of units: 4; Total capacity: 4 800 MW; Construction period: 2014 – 2023; PPA period; 15 years, fixed price terms. An account of the activities during 2011, the Worley Parsons participation are presented and a tentative project schedule is given

  7. Principles of tariff determination for NPP electric power generation

    International Nuclear Information System (INIS)

    Ratnikov, B.E.; Gitel'man, L.D.; Artemov, Yu.N.; Fiantsev, V.S.

    1988-01-01

    Foundations of price-setting and order of accounting arrangement for NPP electric power are considered. NPP tariffs are established proceeding from standard costs of power generation. The standards are differentiated as to NPP groups, depending on technical, regional and natural geographic factors, taking into account the facility type, unit capacity and the number of similar NPP units. The conclusion is made that under conditions of NPP economic independence expansion and creation of prerequisites for going over to self-financing principles and also due to the qualitatively new stage of nuclear power generation development the level of efficiency, forseen by the tariffs, should be increased

  8. Biotic elements of NPP techno-ecosystem

    International Nuclear Information System (INIS)

    Protasov, A.A.; Silaeva, A.A.

    2013-01-01

    Specific features of biotic elements in the NPP techno-ecosystems were considered and compared with natural ecosystems. Relationships between biotic communities and environmental factors that are specific to the techno-ecosystems were discussed, and the problems of limitation of biological hindrances in operation of equipment, principles of hydrobiological and environmental monitoring were considered.

  9. NPP Mochovce - a project of extraordinay significance

    International Nuclear Information System (INIS)

    Chwolik, I.; Debru, M.

    2000-01-01

    In this paper and in this presentation the reactor safety upgrading of two blocks of the NPP V-1 Bohunice, some results of participation on safety upgrading by the German-French consortium EUCOM (Framatome and Siemens-KWU) are presented. (author)

  10. Cernavoda NPP training programs The paper presents a general assessment of Cernavoda NPP personnel training programs,

    International Nuclear Information System (INIS)

    Valache, Cornelia

    2008-01-01

    The paper presents a general assessment of Cernavoda NPP personnel training programs, highlighting the role of training in human performance improvement. Cernavoda NPP Personnel Training and Authorization Department (PTAD) is responsible for the training of CNE Cernavoda NPP personnel and its contractors. PTAD is structured in a manner ensuring the support and response to all plant training, qualification and authorization requirements. The training of personnel is continuously adapted based on IAEA Guides and INPO/WANO recommendations, to keep with world standards, based on the internal and external reviews. At Cernavoda NPP the Training Concept and the Training Programs are based on SAT - Systematic Approach to Training. The Training Concept is established on a set of training documents (RD's, SI's, IDP's), which address all the SAT phases: Analysis, Design, Development, Implementation and Evaluation. The Training Programs are structured on the initial and continuing personnel training. Their content and goals are responding to the training specific needs for each plant major job family. In order to successfully support NPP training programs, CNPP training center has upgraded classrooms with new presentation facilities and there are plans to expand the space of the building, to develop additional operator and maintenance skills facilities. By responding in a timely and completely manner to all plant training requirements PTAD will help in rising human performance of Cernavoda NPP personnel, supporting the safe, efficient and cost effective production of power. (author)

  11. New ICRP recommendations and radiation safety of an NPP

    International Nuclear Information System (INIS)

    Janzekovic, H.

    2007-01-01

    In March 2007 the fundamental radiation protection recommendations used world-widely in nuclear facilities were approved by the ICRP. Implementation of radiation safety standards in an NPP is a challenging issue related to all NPP phases from planning a site and its design to its decommissioning also because if neglected it could be very difficult if not impossible to implement improvement of radiation safety later during operation or decommissioning without a substantial cost. The standards are changing with a period of 15 years which is small regarding a prolonged lifetime of many NPPs and also foreseen lifetime of new NPPs, i.e. 60 years. The new recommendations are actually an upgrading of the ICRP 60. Among other changes new sets of wR and wT are given, as well as an update of around 50 different values related to doses. Two new concepts are also tackled i.e. terrorist attacks and protection of the environment. The influence of the new recommendations on the radiation safety of NPPs can be analysed by a selection of four renewed or new concepts: types of exposure situation, dose constraints, source-related approach and safety and security. Their implementation could lead to upgrading the radiation safety of future or existing NPPs as well as of decommissioning processes. Some of the concepts were already extensively and successfully used by designers of modifications or of new NPPs, as well as by operators. (author)

  12. Seismic re-evaluation of Kozloduy NPP criteria, methodology, implementation

    International Nuclear Information System (INIS)

    Kostov, M.

    2003-01-01

    The paper describes some features of the methodology applied for seismic upgrading of civil structures at the site of the Kozloduy NPP. The essence of the methodology is the use of as-build data, realistic damping and inelastic reduction factors. As an example of seismic upgrading the analyses of units 3 and 4 are presented. The analyses are showing that for effective seismic upgrading detailed investigations are needed in order to understand the significant response modes of the structures. In the presented case this is the rotation of the attached flexible structures to the stiff reactor building. Based on this an upgrading approach is applied to increase the seismic resistance for the predominant motion. The second significant approach applied is the strengthening of the prefabricated element joints. Although it is very simple it allows use of the available element capacity. (author)

  13. The Effect of NPP's Stack Height to Radiation Dose

    International Nuclear Information System (INIS)

    Pandi, Liliana Yetta; Rohman, Budi

    2003-01-01

    The purpose of dose calculation for accidents is to analyze the capability of NPP to maintain the safety of public and workers in case an accident occurs on the Plant in a site. This paper calculates the Loss of Coolant Accident in PWR plant. The calculation results shows that no risks of serious radiation exposure are given to the neighboring public even if such a large accident occurred, and the effect of stack height can be predicted by analysis of the calculation results. The whole dose is calculated for some location (100 m, 300 m, 500 m, 700 m, 900 m, 1500 m, and 2000 m) with three difference stack height i.e. 0 m, 40 m and 100 m. The result of the whole dose calculation is under permitted criteria for whole dose : 0.25 Sv and thyroid dose : 3.0 Sv. The calculation of radiation dose in this paper use EEDCDQ code

  14. Quality of Industry Support to NPP Krsko

    International Nuclear Information System (INIS)

    Nemcic, K.

    2008-01-01

    NPP Krsko developed program for Supplier evaluation and performance. During the regular control of suppliers and evaluation of industry support to NPP Krsko quality problems were reported. Different quality systems were evaluated and different suppliers as: design organizations, equipment manufacturers, material vendors were audited or surveillance was performed. This paper discuss and report various cases where quality issues were problems based on audit results and present actions and efforts undertaken by the NE Krsko Quality Assurance Department to improve performance of the contractors, vendors, suppliers. New and different quality standards as approach in numerous articles are described as improvement or quality changes but also 'different opinion exist'. This paper also presents the author view and approach how to solve the possible future problems with different quality systems and organisations used by industry who support daily operation of NE Krsko and give recommendations for future nuclear projects.(author)

  15. Intelligent system for accident identification in NPP

    International Nuclear Information System (INIS)

    Hernandez, J.L.

    1998-01-01

    Accidental situations in NPP are great concern for operators, the facility, regulatory bodies and the environmental. This work proposes a design of intelligent system aimed to assist the operator in the process of decision making initiator events with higher relative contribution to the reactor core damage occur. The intelligent System uses the results of the pre-operational Probabilistic safety Assessment and the Thermal hydraulic Safety Analysis of the NPP Juragua as source for building its knowledge base. The nucleus of the system is presented as a design of an intelligent hybrid from the combination of the artificial intelligence techniques fuzzy logic and artificial neural networks. The system works with variables from the process of the first circuit, second circuit and the containment and it is presented as a model for the integration of safety analyses in the process of decision making by the operator when tackling with accidental situations

  16. SAT for NPP personnel training in USA

    International Nuclear Information System (INIS)

    Spinney, R.

    1995-01-01

    This discussion addressed the experience with the application of SAT at USA NPPs. In particular, the transition of NPP training processes, staff composition, and reporting structure from the TMI accident to present. As well, oversight and guidance activities of the INPO and more intensive inspection by the NRC began during this period. The average NPP training staff grew to 30-40 per unit, along with a change in reporting line from plant to corporate management. With the reduction of resources occurring in the late 1980s, overall training staff size decreased, the composition changed, and reporting line reverted to plant management. The overall lessons-learned for application of the SAT consisted of the need for simplification, management involvement, and exploitation of the technology

  17. NPP pipeline devices improvement by unconventional means

    International Nuclear Information System (INIS)

    Ionajtis, R.R.

    1998-01-01

    The main nontraditional approaches to NPP pipeline devices improvement including complex use of the set of principles and engineering criteria assuring reliability increase, introduction of stepwise throttling, application of alloys with shape memory, creation of principally new valves available for repair with removable (small-sized) drives are considered. It is shown that the problems of valves for NPP may be successfully solved by application of alloys and devices with shape memory which provide high applied forced and deformations, and as a results of which the compactness and complex functionality will be considerably (by the factor of 8-10) improved, i.e. realization of control, transmission, amplifying and actuation functions in a single device is possible. That is of great importance when designing passive safety means

  18. Modernization of the oldest Swedish NPP

    International Nuclear Information System (INIS)

    Hagberth, Ronald

    1998-01-01

    OKG operates three BWR units of ABB design: Oskarshamn 1 with a net capacity of 440' MW, Oskarshamn 2 of 600 MW and Oskarshamn 3 of 1160 MW. Oskarshamn 1 NPP was commissioned in 1972 as the first commercial nuclear unit in Sweden. After more than twenty years of successful operation, the unit is now also the first reactor in Sweden to undergo a large safety modernization program. In the year 2000 the Oskarshamn 1 NPP will be modernized to a high level of safety standard and ready for operation for another period of at least 20 years. Experience gained can be used when modernizing other NPPs. The investment program for life extension is reasonable and shows that NPPs can be operated with an expected life span of more than 40 years at an ever-increasing safety level and still be very competitive in a deregulated market. (author)

  19. Aspects of accident management in Cernavoda NPP

    International Nuclear Information System (INIS)

    Dascalu, N.

    1999-01-01

    As a general conclusion, the accident management system as implemented at Cerna voda NPP is expected to be appropriate for handling a severe accident, should it occur, in such a way that the environmental radiological consequences would be insignificant and radiation exposure of the personnel be within recommendations. It is recognized, however, that continued development and verification of the system as well as effective personnel training programs are essential to maintain the safety level achieved. (author)

  20. Organizational aspects of NPP operator training

    International Nuclear Information System (INIS)

    Vel'chinskij, V.I.

    1992-01-01

    The main points of the document regulating the selection, prepation, permission for work and in-service control of NPP personnel developed on the basis of the IAEA requirements are considered. The specialists engaged for work are subjected to qualification, medical, professional, psychological and psychophysiological selections. The scheduled monthly instructive lessons are conducted during the work. The antiaccident and fire-fighting trainings are organized not rarely than twice in three months

  1. Current status of NPP generation IV

    International Nuclear Information System (INIS)

    Yohanes Dwi Anggoro; Dharu Dewi; Nurlaila; Arief Tris Yuliyanto

    2013-01-01

    Today development of nuclear technology has reached the stage of research and development of Generation IV nuclear power plants (advanced reactor systems) which is an innovative development from the previous generation of nuclear power plants. There are six types of power generation IV reactors, namely: Very High Temperature Reactor (VHTR), Sodium-cooled Fast Reactor (SFR), Gas-cooled Fast Reactor (GFR), Lead-cooled Fast Reactor (LFR), Molten Salt Reactor (MSR), and Super Critical Water-cooled Reactor (SCWR). The purpose of this study is to know the development of Generation IV nuclear power plants that have been done by the thirteen countries that are members of the Gen IV International Forum (GIF). The method used is review study and refers to various studies related to the current status of research and development of generation IV nuclear power. The result of this study showed that the systems and technology on Generation IV nuclear power plants offer significant advances in sustainability, safety and reliability, economics, and proliferation resistance and physical protection. In addition, based on the research and development experience is estimated that: SFR can be used optimally in 2015, VHTR in 2020, while NPP types GFR, LFR, MSR, and SCWR in 2025. Utilization of NPP generation IV said to be optimal if fulfill the goal of NPP generation IV, such as: capable to generate energy sustainability and promote long-term availability of nuclear fuel, minimize nuclear waste and reduce the long term stewardship burden, has an advantage in the field of safety and reliability compared to the previous generation of NPP and VHTR technology have a good prospects in Indonesia. (author)

  2. Design safety improvements of Kozloduy NPP

    International Nuclear Information System (INIS)

    Hinovski, I.

    1999-01-01

    Design safety improvements of Kozloduy NPP, discussed in detail, are concerned with: primary circuit integrity; reactor pressure vessel integrity; primary coolant piping integrity; primary coolant overpressure protection; leak before break status; design basis accidents and transients; severe accident analysis; improvements of safety and support systems; containment/confinement leak tightness and strength; seismic safety improvements; WWER-1000 control rod insertion; upgrading and modernization of Units 5 and 6; Year 2000 problem

  3. Nuclear fuel reliability in NPP KRSKO

    International Nuclear Information System (INIS)

    Antolovic, A.; Kurincic, B.

    2001-01-01

    The importance of achieving and maintaining high fuel integrity comes from negative consequences of operation with failed fuel. Failed fuel has a significant effect on operating cost and performance, and increases the radiological consequences to environment. Fuel failures represent a breach in the first barrier (cladding) preventing the release of fission products. Historically NPP Krsko experienced some degradation of fuel cladding integrity. To resolve this problem and to ensure the safe, reliable and cost effective operation of nuclear fuel, NPP Krsko established 'Fuel Integrity Program'. The key elements of the Program are: continuous monitoring and trending of the fuel behaviour through operating cycle, evaluation of key performance indicators (RCS isotopes, operational parameters) to determine whether the fuel defects exist, implementation of appropriate actions to reduce and mitigate the consequences of fuel defects (four action levels), 100% examination of fuel to remove the defective fuel from operation (Ultrasonic (UT), In Mast Sipping (IMS) and visual inspection), evaluating the worldwide experience and fuel performance and, integrating the experience and knowledge into new fuel design (ZIRLO TM cladding, debris filter bottom nozzle, removable top nozzle). Since start of commercial operation fuel integrity has been evaluated considering certain aspects like operation and fuel handling, fuel rod burnup and cycle length, cladding material properties, etc. As a result of successful Fuel Integrity Program NPP Krsko has achieved high performance level in terms of fuel integrity in past four cycles. Also, NPP Krsko calculations show good matching between analytical prediction of number of failed fuel rods from primary coolant activity analysis and inspection results with the Nondestructive Testing (NDT) methods.(author)

  4. The NPP Isar comprehensive Aging Management Program

    International Nuclear Information System (INIS)

    Zander, Andre; Ertl, Stefan

    2012-01-01

    The majority of System, Structure and Components (SSC) in a nuclear power plants are designed to experience a service life, which is far above the intended design life. In most cases, only a small percentage of SSCs are subject to significant aging effects, which may affect the integrity or the function of the component. The process of aging management (AM) has the objective to monitor and control degradation effects which may compromise safety functions of the plant. And furthermore, to ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects. Safety-related aspects and the targeted high availability of the power plant as well as the requirements stipulated by German regulatory authorities prompted the operator of NPP ISAR to introduce an aging surveillance program. The NPP Isar as well as the German NPPs has to be following in the scope of aging management the KTA 1403 guideline. The NPP Isar surveillance program based on the KTA 1403 guideline covers the following aspects: - Scoping and screening of safety relevant Systems, Structures and Components (SSC); - Identification of possible degradation mechanisms for safety relevant SSC; - Ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects; - Transferability check of industry experience (internal and external events); - Annual preparation of an AM status report. (author)

  5. Optimization of radiation protection at Bohunice NPP

    International Nuclear Information System (INIS)

    Dobis, L.; Svitek, J.

    2003-01-01

    Bohunice Nuclear Power Plant is situated in south - western part of Slovakia about 50 km away from Bratislava. There are four PWR reactors 440 MW e each - two units with reactors WWER - 230 (V1 NPP) and two units with WWER - 213 (V2 NPP). requirements for the optimization process are given in the mentioned Code No.12 of Ministry of Health. Code 12 stipulates the technical and organizational requirements for proving the Rational Achievable Level (RAL) of radiation protection. This level can be proved by means of the comparison of the dose distribution to the costs of protection. An example of two figures of dose constraints is: collective dose 20 man mSv for the specific task; individual exposure 1 mSv per day. The values of the financial equivalents of personal exposure - so called the alpha coefficients - are used for the calculation of the benefit of proposed measures. Impact of legislative changes into Bohunice NPP and optimization process are presented. Apparently the new law and the associate code created a base of transparent and understandable policy of radiation protection and optimization in Slovak Republic. The radiation protection legislative was implemented into the praxis and persons became familiar with it. Defining clear and unambiguous terms facilitated the communication between users and the regulatory body - State Health Institute. Optimization was generally accepted by the workers and managers and began to be a part of safety culture of operation at nuclear power plants. (authors)

  6. Knowledge management in the NPP domain

    International Nuclear Information System (INIS)

    Nilsen, Svein; Bisio, Rossella; Ludvigsen, Jan Tore

    2004-03-01

    This report gives an outlook on Knowledge Management (KM) activities within NPP related establishments as of today. There may be less activity in the NPP world as compared to many other industrial sectors. Still there is an awakening within the NPP industry demanding that KM should be attended to at a larger scale. The most notable reason for this is maybe an imminent increase in the number of people going into retirement. The types of establishments involved cover the major kinds such as utilities, research institutes and worldwide nuclear organizations. The report sums up a few of those efforts that are presently being implemented. Moreover the report looks at general advancements within the field of knowledge management. Simply stated the endeavours belong to either one of two classes. The first class emphasize the use of technology to solve knowledge management problems. The second class regard knowledge management as a problem pertaining to human factors and organizational issues. This report maintain that knowledge management initiatives should make due considerations to both perspectives. This report also sums up the Halden Reactor Project short term KM initiative. (Author)

  7. Safety parameter display system for Kalinin NPP

    International Nuclear Information System (INIS)

    Andreev, V.I.; Videneev, E.N.; Tissot, J.C.; Joonekindt, D.; Davidenko, N.N.; Shaftan, G.I.; Dounaev, V.G.; Neboyan, V.T.

    1995-01-01

    The paper discusses the safety parameter display system (SPDS), which is being designed for Kalinin NPP. The assessment of the safety status of the plant is done by the continuous monitoring of six critical safety functions and the corresponding status trees. Besides, a number of additional functions are realized within the scope of KlnNPP, aimed at providing the operator and the safety engineer in the main control room with more detailed information in accidental situation as well as during the normal operation. In particular, these functions are: archiving, data logs and alarm handling, safety actions monitoring, mnemonic diagrams indicating the state of main technological equipment and basic plant parameters, reference data, etc. As compared with the traditional scope of functions of this kind of systems, the functionality of KlnNPP SPDS is significantly expanded due to the inclusion in it the operator support function ''computerized procedures''. The basic SPDS implementation platform is ADACS of SEMA GROUP design. The system architecture includes two workstations in the main control room: one is for reactor operator and the other one for safety engineer. Every station has two CRT screens which ensures computerized procedures implementation and provides for extra services for the operator. Also, the information from the SPDS is transmitted to the local crisis center and to the crisis center of the State utility organization concern ''Rosenergoatom''. (author). 3 refs, 6 figs, 1 tab

  8. Financial and organizational models of NPP construction projects

    International Nuclear Information System (INIS)

    Ivanov, Timur

    2010-01-01

    The recent evolution of financial and organizational models of NPP projects can be truly reputed to open a new page of the world market of NPP construction. The definition of the concrete model is based mostly on specific cooperation backgrounds and current terms and conditions under which the particular NPP project is being evolved. In this article the most commonly known strategies and schemes of financing structuring for export NPP construction projects are scrutinized. Special attention is paid to the analysis of BOO/BOT models which are based on the public-private partnership. Most BOO/BOT projects in the power sector has Power Purchase Agreements (PPA) as an integral part of them. The PPA key principles are studied here as well. The flexibility and adaptability of the public-private partnership models for financing and organization of the NPP projects contributes substantially to the competitiveness of the NPP projects especially under current economic conditions. (orig.)

  9. On psichological problem of NPP operation and control

    International Nuclear Information System (INIS)

    Mashin, V.A.

    1994-01-01

    The role of psichological factor as a reserve for increasing NPP safety connected with human factor is discussed. It is emphasized that the process of NPP personnel professional training should not be restricted by formation of a certain set of knowledge, skills and experience. It is necessary to initiate ability for constant self-developing. Control for assurance of effective interaction of the whole NPP personnel is an important problem

  10. Experience and specific features of construction of the Kursk NPP unit-2

    International Nuclear Information System (INIS)

    Saakyan, V.A.; Kirpichnikov, V.I.; Sysoev, V.S.

    1980-01-01

    The experience of constructing the second unit of the first Kursk NPP generation with the RBMK-1000 reactor is described. The construction technology applies new industrial methods such as follows: mounting units assembled in-site from ribbed panels of plant production cast concretes, new design of thermal isolation and openings. The labour costs and duration of the reactor unit construction are analyzed by stages [ru

  11. Safety Culture Survey in Krsko NPP

    International Nuclear Information System (INIS)

    Strucic, M.; Bilic Zadric, T.

    2008-01-01

    The high level of nuclear safety, stability and competitiveness of electricity production, and public acceptability are the main objectives of Krsko Nuclear Power Plant. This is achievable only in environment where strong Safety Culture is taking dominant place in the way how employees communicate, perform tasks, share their ideas and attitudes, and demonstrate their concern in all aspects of work and coexistence. To achieve these objectives, behaviour of all employees as well as specific ethical values must become more transparent and that must arise from the heart of organization. Continuous ongoing and periodic self assessments of Safety Culture in Krsko NPP present major tools in implementation process of this approach. Benefits from Periodic interdisciplinary focused self assessment approach, which main intention is finding the strengths and potential areas for improvements, was used second time to assess the area of Safety Culture in Krsko NPP. Main objectives of self assessment, performed in 2006, were to increase the awareness of the present culture, to serve as a basis for improvement and to keep track of the effects of change or improvement over a longer period of time. For the purpose of effective self assessment, extensive questionnaire was used to obtain information that is representative for whole organization. Wide range of questions was chosen to cover five major characteristics of safety culture: Accountability for safety is clear, Safety is integrated into all activities, Safety culture is learning-driven, Leadership for safety is clear and Safety is a clearly recognized value. 484 Krsko NPP employees and 96 contractors were participated in survey. 70-question survey provided information that was quantified and results compared between groups. Anonymity of participant, as well as their willingness to contribute in this assessment implicates the high level of their openness in answering the questions. High number of participant made analysis of

  12. Safety enhancement in NPP Bohunice

    International Nuclear Information System (INIS)

    Lipar, M.; Mihalik, M.

    1997-01-01

    The upgrading and safety enhancement of both the Bohunice V-1 and V-2 reactors is described in detail. The total estimated cost of the gradual reconstruction of these two units during 1996 to 1999 is 180 mil. US dollars. For the 1995 to 1997 period, the actions common for both units include a quality assurance programme, a personnel training programme, installation of a multifunction simulator, implementation of symptom-oriented operation procedures, installation of diagnostic systems, of a site security system, and of a teledosimetric system. At present, the main maintenance tasks are: to carry out major repair of units, to remedy service interruptions, to enhance equipment service availability, to enhance the technical level of corrective actions at equipment. Investment into maintenance level upgrade has grown from 7.5 mil. Slovak crowns in 1994 to estimated 32 mil. in 2000. The partners of international cooperation are mentioned. (M.D.)

  13. Probabilistic assessment of NPP safety under aircraft impact

    International Nuclear Information System (INIS)

    Birbraer, A.N.; Roleder, A.J.; Arhipov, S.B.

    1999-01-01

    Methodology of probabilistic assessment of NPP safety under aircraft impact is described below. The assessment is made taking into account not only the fact of aircraft fall onto the NPP building, but another casual parameters too, namely an aircraft class, velocity and mass, as well as point and angle of its impact with the building structure. This analysis can permit to justify the decrease of the required structure strength and dynamic loads on the NPP equipment. It can also be especially useful when assessing the safety of existing NPP. (author)

  14. From the chronicle of training of Dukovany NPP staff

    International Nuclear Information System (INIS)

    2005-01-01

    The long way the Dukovany NPP had to go before the plant staff was fully qualified and skilled is described. First the training concept was prepared, then the necessary training facilities were set up, lecturers and instructors were hired and trained, training programmes and training materials were developed, and ultimately the first training course was launched in 1979. A training NPP was constructed and a full-scope simulator of the Dukovany NPP was set up. The current status of organization of NPP staff training by the CEZ utility is highlighted. (author)

  15. Predisposal of Radioactive Waste from NPP 1000 MWe

    International Nuclear Information System (INIS)

    Suryantoro

    2007-01-01

    Predisposal of radioactive waste from NPP 1000 MW which was planned to be operated in 2016 has been conducted. In this study NPP applying PWR type was assumed. This assessment comprises all aspects of radioactive waste coming from NPP. One through cycle was chosen consequently no reprocessing step will be conducted. The assessment shows that technologically all radioactive waste treatment process rising from NPP operation has similarities to the existing radioactive waste process conducted by RWI which has lower scale of waste amount. (author)

  16. Romania: Cernavoda 2 NPP. Licensing requirements. Annex 9

    International Nuclear Information System (INIS)

    Biro, L.

    1999-01-01

    The annex deals with the Romanian Nuclear Safety Authority (National Commission for Nuclear Activities Control - CNCAN) licensing requirements for Cernavoda 2 NPP. These licensing requirements are in accordance with the Regulation Policy Statement applicable for Cernavoda NPP and contain the general aspects deriving from laws, regulations and regulation practices included in norms and in specific documentation. The licensing requirements issued by CNCAN in May 1997 takes into consideration the fact that Cernavoda 2 is a delayed NPP. This annex provides only those key elements, which are relevant to illustrate the regulatory requirements for Cernavoda 2 as a delayed NPP. More details are presented in the original document issued by CNCAN. (author)

  17. Training center of Rovenskaya NPP. The experience of creation

    International Nuclear Information System (INIS)

    Fedorov, O.M.; Aristov, B.N.

    1991-01-01

    Experience in creation of a teaching-training centre at the Rovno NPP, which uses means available at unified NPPs, at most is discussed. The centre hardware complex functions include the event filing and providing for user-friendly interface with NPP technical personnel under training. The system of personnel training at the Rovno NPP teaching-training centre gives an opportunity to analyze accidents and emergency conditions more completely and carefully. The taching analysis of failures and accidents by a NPP operators using the complex of the teaching-training centre hardware sufficiently improves knowledge of particular accidents

  18. Some features of South-Ukrainian NPP information centre's interaction with mass media in post Chernobyl period

    International Nuclear Information System (INIS)

    Kiyashko, S.; Kurilchik, N.

    1995-01-01

    Using the above methods of interaction with the off-site media helped the South Ukraine NPP information centre achieve meaningful results in restoring the image of nuclear power ad making it more trustworthy. This is supported by a review of media Publications since 1989. Quantitative and qualitative modifications of the information flow to the media have yielded substantial changes of the structure of news releases about the South Ukraine NPP and nuclear power. Background information has increased from 1. 5 to 50 percent. Negative information is no longer dominating, and the Chernobyl topic is counterbalanced with diverse NucNet materials about nuclear from throughout the world. (author)

  19. Application of the SASSI soil structure interaction method to CANDU 6 NPP seismic analysis

    International Nuclear Information System (INIS)

    Ricciuti, R.A.; Elgohary, M.; Usmani, S.A.

    1996-01-01

    The standard CANDU 6 NPP has been conservatively qualified for a Design Basis Earthquake (DBE) peak horizontal ground acceleration of 0.2 g. Currently there are potential opportunities for siting the CANDU 6 at higher seismicity sites. In order to be able to extend the use of a standardized design for sites with higher seismicity than the standard plant, various design options, including the use of the SASSI Soil Structure Interaction (SSI) analysis method, are being evaluated. This paper presents the results of a study to assess the potential benefits from utilization of the SASSI computer program and the use of more realistic damping ratios for the structures

  20. Construction work organization at the Paluel NPP (France)

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    Construction work organization at French Paluel NPP, comprising four 1300 MWe power units with PWR type reactors, has been described. Ground works have been performed by three excavating machines with dipper capacity 5.5, 7.6 and 8.3 m 3 , total productivity of them reaching 1200 m 3 /hr. To transport the ground 22 dump trucks with bulk body capacity 18 cm 3 , load-carrying capacity 35 t were used. Each dump truck was loaded in 49-90 s, daily average productivity reached 45000 m 3 , which permitted to fulfil the ground works in two years. To produce concrete mixture at the NPP construction site a concrete plant is built with the productivity 160 m 3 /hr with two computer-controlled concrete-mixing installations. Concrete-placing machines with a telescopic boom transported concrete mixture to 42 m at the boom inclination up to 30 deg. Them the mixture was transported by belt conveyers with the length of a separate link 30 m and it was supplied to rotating conveyer, permitting to place concrete in the radius of 12.5 m at the angle of approximately 24 deg. The rate of placement of concrete in cylindrical part of containment reached 10 m/month and was realized by two concrete-delnvery pipelines up to 118 m long. When erecting building constructions 14 tower cranes with load-carrying capacity of 3-15 t and one tower crane with load carrying capacity of 500 t were used

  1. NPP Tropical Forest: Consistent Worldwide Site Estimates, 1967-1999

    Data.gov (United States)

    National Aeronautics and Space Administration — ABSTRACT: Currently available data on net primary production in tropical forests are extremely limited. Even the best estimates for this biome must be thought of as...

  2. External hazards at Kozloduy and Belene NPP sites

    International Nuclear Information System (INIS)

    Kostov, Marin; Varbanov, Georgy; Andonov, Anton

    2011-01-01

    Conclusions 1. KNPP and BNPP have adequate seismic design base that corresponds to the current standards 2. There is available seismic margin and cliff-edge effects are not probable 3. The external flooding hazard is properly assessed and there is available design margin 4. Anthropogenic hazards are properly assessed and there is available margin. The BNPP is designed also for the largest available aircraft impact (malevolent) 5. The tornado hazard in Bulgaria is negligible. The extreme combination of EQ, flooding, extreme wind, extreme cold and hot weather have to be studied 7. The risk of failure of all surrounding infrastructure due to earthquake, flooding or anthropogenic actions have to be studied 8. The preparedness for extreme hazards have to be improved and trained 9. The extreme hazard mitigation measures have to be constant and continuous effort

  3. A Model-based Approach to Scaling GPP and NPP in Support of MODIS Land Product Validation

    Science.gov (United States)

    Turner, D. P.; Cohen, W. B.; Gower, S. T.; Ritts, W. D.

    2003-12-01

    Global products from the Earth-orbiting MODIS sensor include land cover, leaf area index (LAI), FPAR, 8-day gross primary production (GPP), and annual net primary production (NPP) at the 1 km spatial resolution. The BigFoot Project was designed specifically to validate MODIS land products, and has initiated ground measurements at 9 sites representing a wide array of vegetation types. An ecosystem process model (Biome-BGC) is used to generate estimates of GPP and NPP for each 5 km x 5 km BigFoot site. Model inputs include land cover and LAI (from Landsat ETM+), daily meteorological data (from a centrally located eddy covariance flux tower), and soil characteristics. Model derived outputs are validated against field-measured NPP and flux tower-derived GPP. The resulting GPP and NPP estimates are then aggregated to the 1 km resolution for direct spatial comparison with corresponding MODIS products. At the high latitude sites (tundra and boreal forest), the MODIS GPP phenology closely tracks the BigFoot GPP, but there is a high bias in the MODIS GPP. In the temperate zone sites, problems with the timing and magnitude of the MODIS FPAR introduce differences in MODIS GPP compared to the validation data at some sites. However, the MODIS LAI/FPAR data are currently being reprocessed (=Collection 4) and new comparisons will be made for 2002. The BigFoot scaling approach permits precise overlap in spatial and temporal resolution between the MODIS products and BigFoot products, and thus permits the evaluation of specific components of the MODIS NPP algorithm. These components include meteorological inputs from the NASA Data Assimilation Office, LAI and FPAR from other MODIS algorithms, and biome-specific parameters for base respiration rate and light use efficiency.

  4. Jpss System Architecture Npp to the Future

    Science.gov (United States)

    Furgerson, J.; Trumbower, G.

    2012-12-01

    The National Oceanic and Atmospheric Administration (NOAA) is acquiring the next-generation weather and environmental satellite system, named the Joint Polar Satellite System (JPSS). The National Aeronautics and Space Administration (NASA) serves as the acquisition and development agent. JPSS replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA in the 1330 local time of ascending node (LTAN) orbit. The Suomi National Polar-orbiting Partnership (NPP) was launched into the 1330 LTAN orbit on October 28, 2011, and carries advanced sensors which will be featured on JPSS. It serves as a bridge mission and provides continuity for the NASA Earth Observation System and the POES. JPSS-1 is scheduled to launch in 2017. The Defense Meteorological Satellite Program (DMSP) managed by the DoD is operating in the 1730 LTAN orbit. The DoD is developing the Defense Weather Satellite Follow-on (WSF) system which will continue in the 1730 orbit. NASA is developing the Common Ground System (CGS) with the capability to process data from both the JPSS and WSF constellations. The CGS will be operated by NOAA. This poster will provide a top level status update of the program, as well as an overview of the JPSS system architecture. The space segment carries a suite of sensors that collect meteorological, oceanographic, and climatological observations of the earth and atmosphere. The system design allows centralized mission management and delivers high quality environmental products to military, civil and scientific users through a Command, Control, and Communication Segment (C3S). The data processing for NPP/JPSS is accomplished through an Interface Data Processing Segment (IDPS)/Field Terminal Segment (FTS) that processes NPP/JPSS satellite data to provide environmental data products to NOAA and DoD processing centers as well as remote terminal users.

  5. Corporate portal system at PAKS NPP, Hungary

    International Nuclear Information System (INIS)

    2016-01-01

    The new Corporate Portal System (CPS) of Paks NPP was launched in November 2006. The portal is based on one of the latest technologies, Plumtree Enterprise WEB 5.0. The main purpose of the installation of the new technology was to serve the working culture change, to give a platform to access all information and applications including the integrated process model used at the NPP. The new technology also supports those goals which were defined in the organization development programme: e.g. to improve internal communication with the establishment of communities of practice. Installation of the CPS has provided a powerful tool for knowledge management; it is possible to share and find all information through a controlled access in documents from various sources, to have links to people, portlets and different communities. Document management of the Paks NPP is supported by the integration of the Document 5 application, as the new Electronic Data Management System (EDMS) and the CPS. Depending on their access rights, all users of the CPS, through Microsoft Internet Explorer, can access technical, economic and human resources documents which are stored anywhere on the internal network (file servers, EDMS, old INRANET). The CPS is also accessible from the internet through a secure connection. The main concept is the integration of all applications to one platform and to help users to find all information they need. An access control list specifies which users and groups have access to an object (and what kind of access privileges they have such as read, select, edit, admin)

  6. Social consequences of closing the Ignalina NPP

    International Nuclear Information System (INIS)

    Baubinas, R.; Burneika, D.

    2001-01-01

    The possible social consequences of closing the Ignalina Nuclear Power Plant are studied. The social and economical situation in Visaginas and in the Utena region as a precondition for possible social consequences is shown. Also, two main groups of factors that can possibly influence the situation in the labour market are analysed. The problems of the enterprises that create working places and of the inhabitants of Visaginas whose possible behaviour can affect the situation in the labour market are discussed. Also, some proposals to neutralize the social costs of closing the Ignalina NPP are made. (author)

  7. Seismic fragility analysis for NPP structural components

    International Nuclear Information System (INIS)

    Casciati, F.; Faravelli, L.

    1984-01-01

    Relationship between probability of failure and seismic intensity (fragility curves) summarize the results of the vulnerability analysis of a NPP structural component. The appropriate operative procedures for the evaluation of these fragility curves are discussed. The paper illustrates a general purpose computer code which includes two different probabilistic models for two different levels of sophistication in the fragility analysis. Attention is then focussed (i) on the mechanical aspects associated with the local strength estimation (ii) on the simulation of suitable artificial ground motions and (iii) on the definition of an appropriate measure of the seismic intensity. (Author) [pt

  8. Mochovce NPP safety improvement and completion

    International Nuclear Information System (INIS)

    1997-01-01

    6th Nuclear society information meeting dealt with the completion of the Mochovce NPP with regard to implementation of safety measures. It was aimed to next problems: I. 'Survey' presentation on the situation of the nuclear power industry in partner countries; II. Basic technical presentations; III. Presentations of operators of the other VVER 440/213 NPPs on their activities in the field of safety improvement in relation to IAEA recommendations; IV. Technical solutions of safety improvements ranked with IAEA degree 3 (Report SC 108 VVER); V: Technical solutions of selected Safety Measures ranked with IAEA degree 2 and 1 (Report SC 108 VVER)

  9. Students education and training for Slovak NPP

    International Nuclear Information System (INIS)

    Lipka, J.; Slugen, V.; Hascik, J.; Miglierini, M.

    2004-01-01

    Slovak University of Technology is the largest and also the oldest university of technology in Slovakia. Surely more than 50% of high-educated technicians who work nowadays in nuclear industry have graduated from this university. The Department of Nuclear Physics and Technology of the Faculty of Electrical Engineering and Information Technology as a one of seven faculties of this University feels responsibility for proper engineering education and training for Slovak NPP operating staff. The education process is realised via undergraduate (Bc.), graduate (MSc.) and postgraduate (PhD.) study as well as via specialised training courses in a frame of continuous education system. (author)

  10. Digital reactivity meter for NPP Krsko

    International Nuclear Information System (INIS)

    Glumac, B.; Vidmar, M.; Ravnik, M.

    1984-01-01

    Digital or analog reactivity meter is needed in order to perform the necessary low power physics tests after core reload in a nuclear power plant. Nuclear power plant Krsko ordered the construction of such digital reactivity meter on the basis of 'mikro-m' modular computer system that has been developed by IJS. Input signal sampling model as well as realtime reactivity calculation on the basis of the reactor inverse kinetic equation have also been developed by IJS. This digital reactivity meter has already been used to perform the start-up tests in NPP Krsko following first reload in fall of 1983. (author)

  11. Safe 15 Terawatt of Temelin NPP

    International Nuclear Information System (INIS)

    Sula, M.

    2010-01-01

    In this work author presents a project Safe 15 Terawatt realised on the Temelin NPP. This project is one of the eight key projects of the CEZ group, associated in the 'Programme of efficiency'. The project started in June 2007 with long-term goals for horizon of year 2012. The safety indicators will be reached of the first quarter level of world's nuclear power plant - by the end of the first decade. By the end of year 2012 we will have achieved annual production of 15 billion kWh - in the Czech Republic: 15 Terawatt.

  12. Nuclear Oversight Function at Krsko NPP

    International Nuclear Information System (INIS)

    Bozin, B.; Kavsek, D.

    2010-01-01

    The nuclear oversight function is used at the Krsko NPP constructively to strengthen safety and improve performance. Nuclear safety is kept under constant examination through a variety of monitoring techniques and activities, some of which provide an independent review. The nuclear oversight function at the Krsko NPP is accomplished by Quality and Nuclear Oversight Division (SKV). SKV has completed its mission through a combination of compliance, performance and effectiveness-based assessments. The performance-based assessment is an assessment using various techniques (observations, interviews, walk-downs, document reviews) to assure compliance with standards and regulations, obtain insight into performance, performance trends and also to identify opportunities to improve effectiveness of implementation. Generally, the performance-based approach to oversight function is based on some essential elements. The most important one which is developed and implemented is an oversight program (procedure). The program focuses on techniques, activities and objectives commensurate with their significance to plant operational safety. These techniques and activities are: self-assessments, assessments, audits, performance indicators, monitoring of corrective action program (CAP), industry independent reviews (such as IAEA's OSART and WANO Peer Review), industry benchmarking etc. Graded approach is an inherent product of a performance based program and ranking process. It is important not only to focus on the highest ranked performance based attributes but to lead to effective utilization of an oversight program. The attributes selected for oversight need to be based on plant specific experience, current industry operating experience, supplier's performance and quality issues. Collaboration within the industry and effective utility oversight of processes and design activities are essential for achieving good plant performance. So the oversight program must integrate relevant

  13. Sociological investigations on Ignalina NPP and within its surroundings

    International Nuclear Information System (INIS)

    Chiuzhas, A.

    1998-01-01

    The purpose of this study was to determine the impact of Ignalina NPP and Visaginas town on the social territorial processes in the region and to reveal the impact of Ignalina NPP on the regional economic, social, demographic, political and cultural processes in the context of ecological and psychological affect. According to the results of this research three quarters of the inhabitants and the functionaries of local administration hold an opinion that operation of Ignalina NPP posses threat for the population and environment. Meanwhile they are sure that danger of Ignalina NPP is not critical. 21 - 35 % of the local administrators speak for the closure of Ignalina NPP , whereas half of Visaginas residents and three quarters of the local administrators indicate that operation of reactors is expedient. Over 90% of the population do not have sufficient information on the operation of Ignalina NPP. In the opinion of the rest Lithuanian people Ignalina NPP zone is related with the physical danger and the image of Visaginas residents as the 'others', 'strangers'. More than 90% of Ignalina NPP employees are Russian speaking, not native Lithuanians. The social relations of Visaginas with the environment are poor as a result of the situation of the town, lack of communications and cultural self isolation. (author)

  14. Using the digital reactor control systems at NPP

    International Nuclear Information System (INIS)

    Schirl, G.; Hertel, J.

    2006-01-01

    A conception of application of the digital reactor control systems (RCS) at NPP is presented. The digital RCS architecture and safety ensuring are considered. The strategy and algorithm of the operating NPP equipping with the new digital RCS are given too [ru

  15. Unit Commissioning of “Belene” NPP (Bulgaria)

    International Nuclear Information System (INIS)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  16. Balancing preventive and corrective maintenance in Cernavoda Unit 1 NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Marinescu, S.

    2000-01-01

    The paper presents a short reminder of Romania's Cernavoda NPP entering commercial operation and a brief description of the CANDU-6 project on which Unit 1 is based. The short term objectives of the maintenance management, the status of the existing maintenance programmes as well as future predictable maintenance programmes are outlined together with the Government plan to complete the balance of NPP. (author)

  17. Lessons learned from current Qinshan CANDU project and the impact on future NPP's

    International Nuclear Information System (INIS)

    Hedges, K. R.; Didsbury, R.; Yu, S. K. W.

    2000-01-01

    AECL has adopted an evolutionary approach to the development of the CANDU 6 and CANDU 9 Nuclear Power Plant (NPP) designs. Each new NPP project benefits from previous projects and contains an increasing number of fully proven enhancements. In accordance with this evolutionary design approach, AECL has built on the Wolsong and Qinshan successes and the solid performance of the reference CANDU stations to define, review and implement the enhancements for the CANDU 9 NPP. Some of these enhancements include fully integrated project information systems and databases, safety enhancements coming from PSA studies and licensing activities, distributed control systems for plant-wide control and an advanced control center which addresses human factors engineering concepts. Examples of the Qinshan CANDU project delivery enhancements are the utilization of electronic engineering tools for the complete plant, and the linking of these tools with the project material management system and document management systems. The project information is reviewed and approved at the engineering office in Canada and then transmitted to site electronically. Once the electronic data is at site the information packages are extracted as necessary to enable construction and facilitate contract needs with minimum effort. This paper will provide details of the CANDU Qinshan project experiences as well as describing some of the corresponding CANDU 9 enhancements. (author)

  18. Seismic response analysis of Wolsung NPP structure and equipment subjected to scenario earthquakes

    International Nuclear Information System (INIS)

    Choi, In Kil; Ahn, Seong Moon; Choun, Young Sun; Seo, Jeong Moon

    2005-03-01

    The standard response spectrum proposed by US NRC has been used as a design earthquake for the design of Korean nuclear power plant structures. However, it does not reflect the characteristic of seismological and geological of Korea. In this study, the seismic response analysis of Wolsung NPP structure and equipment were performed. Three types of input motions, artificial time histories that envelop the US NRC Regulatory Guide 1.60 spectrum and the probability based scenario earthquake spectra developed for the Korean NPP site and a typical near-fault earthquake recorded at thirty sites, were used as input motions. The acceleration, displacement and shear force responses of Wolsung containment structure due to the design earthquake were larger than those due to the other input earthquakes. But, considering displacement response increases abruptly as Wolsung NPP structure does nonlinear behavior, the reassessment of the seismic safety margin based on the displacement is necessary if the structure does nonlinear behavior; although it has adequate the seismic safety margin within elastic limit. Among the main safety-related devices, electrical cabinet and pump showed the large responses on the scenario earthquake which has the high frequency characteristic. This has great effects of the seismic capacity of the main devices installed inside of the building. This means that the design earthquake is not so conservative for the safety of the safety related nuclear power plant equipments

  19. AREVA NP products and services for NPP operation and maintenance improvement

    International Nuclear Information System (INIS)

    Dechelette, Anne; Rat, Guy Le

    2009-01-01

    AREVA supplies customized services throughout the reactor improvement process according to clients' requirements: safety, performance, availability, obsolescence, operating and maintenance conditions, environment and technical assistance. Form design studies to on site modification and implementation including requalification tests, AREVA, as OEM*, has various products and services in the field of Engineering and Upgrading to satisfy client demands. In keeping with Inpo's AP913 approach, AREVA is particularly skilled in this methodology to help utilities improve availability factor and maintenance programs. AREVA has customized its services to many utilities in cooperating with local partners, suppliers, and engineering service providers through partnerships, consortiums, joint ventures, etc. AREVA's knowledge of the fleet's operation and maintenance experience helps NPP clients to identify the most cost effective improvements and approaches. Different examples of modifications of modifications and improvements performed in France and abroad illustrate AREVA's involvement in the NPP continuous upgrade process

  20. System, economy and ecology viewpoints of the Krsko NPP lifetime extension

    International Nuclear Information System (INIS)

    Novsak, M.; Spiler, J.; Zagar, T.; Pirs, B.; Bole, A.; Bregar, Z.; Cuhalev, I.; Derganc, B.; Ivanjko, S.; Matvoz, D.; Sustersic, A.; Valencic, L.; Zabric, I.; Zlatarev, G.; Babuder, M.

    2007-01-01

    Krsko NPP plant life extension was analysed and evaluated with respect to system, economy and ecology viewpoints. From the system perspective it was established that also in the extended lifetime the plant will remain in operation as a base load electricity supplier. The systematic review was performed to determine its overall competitiveness against advanced coal, gas and new nuclear units. The analysis considered also hydro and renewable sources. Analysis and evaluations resulted in the conclusion that the Krsko NPP lifetime extension is the most effective alternative for base load production due to small additional capital investments, low fuel costs, no new siting requirements, lowest climate and environmental impact, and reliable and safe operation. (author)

  1. Project No. 10 - Partial restoration of Ignalina NPP territory

    International Nuclear Information System (INIS)

    2000-01-01

    At present Ignalina NPP territory makes a total of 2544 ha of land. Due to termination of construction activity development and due to the decision taken to shutdown unit 1 the need in such a territory fell off. For normal and safe operation of Ignalina NPP 1440 ha is enough, including 1237 ha for of Ignalina NPP administrative area and 203 ha for auxiliary objects. Ignalina NPP will have to rearrange territory, forestry that was damaged during the construction activities of the plant and to restore the damaged farmlands and to pass the rearranged forestry that belonged to the Ignalina NPP to the Ministry of Forestry. The total estimated cost of the project is about 1.042 M EURO

  2. Prioritization of Delay Factors for NPP Construction Risk in International Project by Using AHP Methodology

    International Nuclear Information System (INIS)

    Hossen, Muhammed Mufazzal; Kang, Sunkoo; Kim, Jonghyun

    2014-01-01

    construction delay of NPP. The main contribution of the work was the identification of main cause of NPP construction schedule delay for turnkey contractual approached international project in different level. The second contribution was a development of a multi-criteria decision making model for the prioritization of NPP construction delay risk factors. Finally, prioritization of delay factors in different levels of NPP construction delay risk factors were accomplished. The model is developed by using the AHP methodology. This study has produced results and insights that involve one of the most vital aspect which is the quantitative weights and ranking of factors that affect delay in NPP construction. Undoubtedly, it is a necessity in the NPP construction industry for the use of quantitative terms when it comes to schedule delay risk. The outcomes of this study confirm that the model is capable to support decision-makers to examine the strengths and weaknesses of factors in different level of the NPP construction phase. Decision makers of nuclear industry can understand the significance of different factors on NPP construction phase and they can apply risk informed decision making to avoid unexpected construction delay of NPP. This study finds the different party's importance in behind the construction schedule delay of NPP which constitutes main contractor (28.4%), regulatory authority (27.3%), Financial and Country Factor (23.5%), and utility (20.8%).The results show that the top most important 5 sub factors according to global weight in level 2 are delayed regulatory approval, country factor, inadequate completion of design before start of construction, slow procurement, manufacturing of equipment and delivery to the site for installation, and financial matters. This study finds top most important 10 sub-sub factors in the lowest level which are uncompromising regulatory criteria and conflicting licensing documents with existing regulations, robust design documents

  3. Radiological characterisation on V1 NPP technological systems and buildings - Contamination

    International Nuclear Information System (INIS)

    Hanzel, Richard; Rapant, Tibor; Svitek, Jaroslav

    2012-01-01

    Since 2001, the preparation of V1 NPP practical decommissioning has been supported and partly financed by the Bohunice International Decommissioning Support Fund, under the administration of the European bank for Reconstruction and development. AMEC Nuclear Slovakia, together with partners STM Power and EWN GmbH, performed BIDSF B.4 project - Decommissioning database development. The main purpose of the B6.4 project was to develop a comprehensive physical and radiological inventory database to support RAW management development of the decommissioning studies and decommissioning project of Bohunice V1 NPP. AMEC Nuclear Slovakia was responsible mainly for DDB design, planning documents and physical and radiological characterization including sampling and analyses of the plant controlled area. The objective of V1 NPP radiological characterization was summarisation of sampling and analyses results, description of methodology used for radiological characterization and determination of the V1 NPP radiological inventory. Results of the characterization survey included the identification and distribution of contamination in buildings, structures, and other site facilities or other impacted media. The characterization survey clearly identified those portions of the site that have been affected by site activities and are contaminated. The survey also identified the portions of the site that have not been affected by these activities and can be marked as 'not impacted'. Radiological data have been presented also on the basis of index RAI level, where 5 radiological classes have been defined. On the basis of sampling and analyses results following radiological parameters have been assigned to all impacted components and civil structures included in DDB: dose rate in contact, dose rate in distance 1 m, external surface contamination, internal surface contamination and volume/mass contamination. Each room in controlled area has been described by following radiological parameters

  4. NPP unusual events: data, analysis and application

    International Nuclear Information System (INIS)

    Tolstykh, V.

    1990-01-01

    Subject of the paper are the IAEA cooperative patterns of unusual events data treatment and utilization of the operating safety experience feedback. The Incident Reporting System (IRS) and the Analysis of Safety Significant Event Team (ASSET) are discussed. The IRS methodology in collection, handling, assessment and dissemination of data on NPP unusual events (deviations, incidents and accidents) occurring during operations, surveillance and maintenance is outlined by the reports gathering and issuing practice, the experts assessment procedures and the parameters of the system. After 7 years of existence the IAEA-IRS contains over 1000 reports and receives 1.5-4% of the total information on unusual events. The author considers the reports only as detailed technical 'records' of events requiring assessment. The ASSET approaches implying an in-depth occurrences analysis directed towards level-1 PSA utilization are commented on. The experts evaluated root causes for the reported events and some trends are presented. Generally, internal events due to unexpected paths of water in the nuclear installations, occurrences related to the integrity of the primary heat transport systems, events associated with the engineered safety systems and events involving human factor represent the large groups deserving close attention. Personal recommendations on how to use the events related information use for NPP safety improvement are given. 2 tabs (R.Ts)

  5. Brief Assessment of Krsko NPP Decommissioning Costs

    International Nuclear Information System (INIS)

    Skanata, D.; Medakovic, S.; Debrecin, N.

    2000-01-01

    The first part of the paper gives a brief description of decommissioning scenarios and models of financing the decommissioning of NPPs. The second part contains a review of decommissioning costs for certain PWR plants with a brief description of methods used for that purpose. The third part of the paper the authors dedicated to the assessment of decommissioning costs for Krsko NPP. It does not deal with ownership relations and obligations ensuing from them. It starts from the simple point that decommissioning is an structure of the decommissioning fund is composed of three basic cost items of which the first refers to radioactive waste management, the second to storage and disposal of the spent nuclear fuel and the third to decommissioning itself. The assessment belongs to the category of preliminary activities and as such has a limited scope and meaning. Nevertheless, the authors believe that it offers a useful insight into the basic costs that will burden the decommissioning fund of Krsko NPP. (author)

  6. Monitors for the surveillance of NPP components

    International Nuclear Information System (INIS)

    Giera, H.D.; Grabner, A.; Hessel, G.; Koeppen, H.E.; Liewers, P.; Schumann, P.; Weiss, F.P.; Kunze, U.; Pfeiffer, G.

    1985-01-01

    Noise diagnostics have reached a level where it is possible and efficient to integrate this method as far as possible into the control and safety system of the NPP. The communication between the noise diagnostic system and the plant operator is the main problem of integration. It is necessary to refine the diagnostic results in such a manner that the operator can use them without being skilled in noise analysis respectively without contacting a noise specialist. Moreover, in this way the noise specialist can be released from routine surveillance. For selected processes which have already intensively been investigated because of their inherent risk this can be achieved by means of autonomously working monitors. Independently the monitors perform signal processing and diagnosis. In general this means that they classify the technical condition of the monitored component into one of the two categories: ''normal'' or ''anomalous''. The result will be annunciated to the plant operator who will in the first step of the development contact the noise specialist only if anomalies have occurred in order to clarify the cause. At the NPP ''Bruno Leuschner'' Greifswald, three hardware monitors for loose parts detection, control rod surveillance and main coolant pump diagnosis are being tested. Additionally a so-called software monitor for diagnosing the pressure vessel vibrations is in preparation. The techniques and the hardware used for the monitors as well as planned further improvements of the integration of noise diagnostics into the control and safety system are discussed in this paper. (author)

  7. Utilization of NPP Krsko plant specific simulator

    International Nuclear Information System (INIS)

    Fifnja, I.; Pribozic, F.; Krajnc, J.

    2002-01-01

    NPP Krsko started with licensed operator training using its own plant-specific full scope simulator in April 2000. Today, two years after simulator was completed, the benefits of simulator use are visible in various fields. The simulator was effectively used to conduct licensed operator continuing training and practical examinations. Two-year continuous training program was designed to help maintain and improve operator performance. The simulator was also used to provide just-in-time training prior to plant evolutions. Together with licensed operators the non-licensed operators are also included into simulator training to provide affective team training opportunity and to foster good communication and increase scenario realism. Now, the first group of initial licensed operator training using plant-specific simulator is also almost completed. It is the first time that NPP Krsko training department conducted complete initial training and this will represent the great experience for future training. Besides training, the simulator was also utilized for procedure development and validation, operating standards development, testing of plant modifications and other activities, like emergency preparedness procedures validation and training exercises.(author)

  8. Cernavoda NPP - Management of internal tritium exposures

    International Nuclear Information System (INIS)

    Chitu, Catalina; Popescu, Ion; Samson, Liliana; Simionov, Vasile

    2010-01-01

    Full text: During normal operation of a CANDU nuclear power plant significant tritium quantities are generated. Through design solutions that have been implemented we manage to control the tritium losses from the reactor systems and keep them as low as possible. Special dryers are designed and are used to remove moisture from different ventilation systems of a CANDU reactor in order to maintain tritium in air concentration and gaseous tritium emissions below the limits established by the national authorities. Vapor Recovery System is designed to control tritium in air concentration and to recover heavy water loss from PHT and Moderator Systems and to control the air circulation, providing atmosphere separation between different areas of the Reactor Building. Cernavoda NPP developed a special strategy in order to control workers' internal exposures to tritium and dedicated programs are running to implement this strategy: improvement of radiation protection procedures; increasing equipment performances; leakages prevention through maintenance program; finalization of the de-tritiation facility. This paper presents the evolution of workers tritium exposure and emphasizes the results of the ALARA policy promoted by Cernavoda NPP management. (authors)

  9. Central alarm system replacement in NPP Krsko

    International Nuclear Information System (INIS)

    Cicvaric, D.; Susnic, M.; Djetelic, N.

    2004-01-01

    Current NPP Krsko central alarm system consists of three main segments. Main Control Board alarm system (BETA 1000), Ventilation Control Board alarm system (BETA 1000) and Electrical Control Board alarm system (BETA 1100). All sections are equipped with specific BetaTone audible alarms and silence, acknowledge as well as test push buttons. The main reason for central alarm system replacement is system obsolescence and problems with maintenance, due to lack of spare parts. Other issue is lack of system redundancy, which could lead to loss of several Alarm Light Boxes in the event of particular power supply failure. Current central alarm system does not provide means of alarm optimization, grouping or prioritization. There are three main options for central alarm system replacement: Conventional annunciator system, hybrid annunciator system and advanced alarm system. Advanced alarm system implementation requires Main Control Board upgrade, integration of process instrumentation and plant process computer as well as long time for replacement. NPP Krsko has decided to implement hybrid alarm system with patchwork approach. The new central alarm system will be stand alone, digital, with advanced filtering and alarm grouping options. Sequence of event recorder will be linked with plant process computer and time synchronized with redundant GPS signal. Advanced functions such as link to plant procedures will be implemented with plant process computer upgrade in outage 2006. Central alarm system replacement is due in outage 2004.(author)

  10. Corrective action program at Krsko NPP

    International Nuclear Information System (INIS)

    Skaler, F.; Divjak, G.; Kavsek, D.

    2004-01-01

    The Krsko NPP develops software that enables electronic reporting of all kind of deviations and suggestions for improvement at the plant. All the employees and permanent subcontractors have the access to the system and can report deviations. NPP has centralized decision process for the distribution of reported deviation. At this point all direct actions are electronically tracked. The immediate benefits of this new tool were: Reporting threshold has been lowered; Number of reporting people has increased; One computerized form for all processes; Decision, which process will solve the deviation, is centralized; All types of deviation are in the same environment; Our experiences of the processes are incorporated in the program; Control of work that has been done; Archiving is electronic only. Software basic data: Application system Corrective action program is a WEB application. Data is stored in Oracle 8.1.7 i database. Users access application through PL/SQL gateway on Oracle 9i Application Server 1.0.2. using Microsoft Internet Explorer browsers(Version 5 or later). Reports are implemented by Oracle Reports 6i. Menus are designed by Apycom Java Menus and Buttons v4.23. Our Presentation will include: Basic idea; Implementation change management; Demonstration of the program.(author)

  11. Fiddle at financing of Mochovce NPP

    International Nuclear Information System (INIS)

    Beer, G.

    2003-01-01

    Slovak police found out and documented racket in financing of third and fourth block of Mochovce NPP. Damage should be 144 millions Slovak crowns. Investigator consequently accused twenty-three Slovaks from foundation, trump up and supporting of criminal group and deception. Two persons are suggested to be taken to custody. Skoda Praha, which was general supplier of construction for 1,5 billions Slovak crowns, in 2001 allowed to create a connection to let the finances between Slovenske elektrarne, a.s., Bratislava as investor and Skoda as subcontractor to be paid through three mediator companies. Companies got authorization to balance the relationship among all interested subjects. Confused network of 118 treaties was created. They invoiced reward from money current based on these treaties. Reward represented up to 70 per cent of transferred resources in some cases. According to Minister of Domestic Affairs Vladimir Palko it will be necessary to find out where is actually the money. For the time being nobody from NPP is among accused. (Author)

  12. Automated personal dosimetry monitoring system for NPP

    International Nuclear Information System (INIS)

    Chanyshev, E.; Chechyotkin, N.; Kondratev, A.; Plyshevskaya, D.

    2006-01-01

    Full text: Radiation safety of personnel at nuclear power plants (NPP) is a priority aim. Degree of radiation exposure of personnel is defined by many factors: NPP design, operation of equipment, organizational management of radiation hazardous works and, certainly, safety culture of every employee. Automated Personal Dosimetry Monitoring System (A.P.D.M.S.) is applied at all nuclear power plants nowadays in Russia to eliminate the possibility of occupational radiation exposure beyond regulated level under different modes of NPP operation. A.P.D.M.S. provides individual radiation dose registration. In the paper the efforts of Design Bureau 'Promengineering' in construction of software and hardware complex of A.P.D.M.S. (S.H.W. A.P.D.M.S.) for NPP with PWR are presented. The developed complex is intended to automatize activities of radiation safety department when caring out individual dosimetry control. The complex covers all main processes concerning individual monitoring of external and internal radiation exposure as well as dose recording, management, and planning. S.H.W. A.P.D.M.S. is a multi-purpose system which software was designed on the modular approach. This approach presumes modification and extension of software using new components (modules) without changes in other components. Such structure makes the system flexible and allows modifying it in case of implementation a new radiation safety requirements and extending the scope of dosimetry monitoring. That gives the possibility to include with time new kinds of dosimetry control for Russian NPP in compliance with IAEA recommendations, for instance, control of the equivalent dose rate to the skin and the equivalent dose rate to the lens of the eye S.H.W. A.P.D.M.S. provides dosimetry control as follows: Current monitoring of external radiation exposure: - Gamma radiation dose measurement using radio-photoluminescent personal dosimeters. - Neutron radiation dose measurement using thermoluminescent

  13. Mochovce site

    International Nuclear Information System (INIS)

    1997-01-01

    In Mochovce site the construction of four units of WWER 440 NPP with V-213 type of reactor is being carried out. The financing of Mochovce units completion was resolved in April 1996. The completion work commenced at the construction site under leadership of SKODA Prague, the general supplier. The completion work on building part and tests of constructional electric distributions and lightning constructors started. The revisions in technological part were finished, and final protocols from revisions are the basis for starting of completion work. The assembly of transport container anchorage,ventilation system in hermetic areas and hermetic coverage of pools for stored spent nuclear fuel is being carried out. The pre-completion tests of instrumentation and control of ventilation systems, individual dosimetric control in medical station, and tests of nuclear programme according to commissioning and assembling work schedule at the equipment for physical protection of the NPP area started. Inspection activities at Mochovce were performed in accordance with inspection plan for 1996. Evaluation of routine inspections was performed by means of quarterly protocols. Main findings from the inspections performed in Mochovce were in the following areas: (a) deficiencies in the knowledge of the respective regulation and conditions from the Resolution of the state regulatory body, concerning selected employees; (b) training of the selected employees; (c) aim of the measures imposes by inspectors is to eliminate deficiencies in preparation of programmes for pre-completion and completion testing. NRA SR assessment activities at Mochovce NPP were focused mainly on approving and inspecting of design modification to approving programmes for pre-completion and completion testing of system s and equipment and on approving quality assurance programmes. The suggestions of international missions, which reviewed Mochovce safety in the years, were taken into consideration in the programme

  14. Safety analyses of the electrical systems on VVER NPP

    International Nuclear Information System (INIS)

    Andel, J.

    2004-01-01

    Energoprojekt Praha has been the main entity responsible for the section on 'Electrical Systems' in the safety reports of the Temelin, Dukovany and Mochovce nuclear power plants. The section comprises 2 main chapters, viz. Offsite Power System (issues of electrical energy production in main generators and the link to the offsite transmission grid) and Onsite Power Systems (AC and DC auxiliary system, both normal and safety related). In the chapter on the off-site system, attention is paid to the analysis of transmission capacity of the 400 kV lines, analysis of transient stability, multiple fault analyses, and probabilistic analyses of the grid and NPP power system reliability. In the chapter on the on-site system, attention is paid to the power balances of the electrical sources and switchboards set for various operational and accident modes, checks of loading and function of service and backup sources, short circuit current calculations, analyses of electrical protections, and analyses of the function and sizing of emergency sources (DG sets and UPS systems). (P.A.)

  15. Pre feasibility assesment of smart off shore NPP (ONPP) of gravity based-structure type for Indonesia

    International Nuclear Information System (INIS)

    Sahala M Lumbanraja; Dharu Dewi

    2017-01-01

    The SMART ONPP GBS-type is a small power (100 MWe) pressurized water reactor, and located at offshore site. This technology was developed based on existing SMART nuclear technology & offshore drilling technology with a gravity-based type of structure. This is a response to the post-Fukushima accident, Japan (2011), to improve the safety system, overcome the land limitations, and minimize the public resistance to NPP cases in the inland. The purpose of this paper is to assess the pre-feasibility of the implementation of GBS NPP in Indonesia both in terms of technological feasibility and regulation. The method used is literature review and continued with descriptive analysis. The result shows that SMART ONPP are worth considering because they offer improved aspects of safety, offshore tread availability, and better public acceptance. So far, this NPP can not be implemented in Indonesia because it is hampered by Government Regulation No. 2 year 2014 regarding Licensing of Nuclear Installation Safety and Security which stipulates that site is an inland location and NPP built in Indonesia should be proven. (author)

  16. ATUCHA I NPP - Emergency drill practice

    International Nuclear Information System (INIS)

    Sanda, Alejandro; Rosales, Gabriel

    2008-01-01

    Full text: Atucha I NPP performs an Emergency Drill Practice once a year. Its main goals are: -) Fulfill the requirements of the Argentine Nuclear Regulatory Authority (ARN) regarding Atucha I NPP's Operating License; -) Fulfill the commitment with the community regarding the safe and reliable operation Atucha I NPP; -) Verify the response of the Civil Organizations, Security Forces, and Armed Forces, as well as the correct application of the Emergency Plan; -) Perform the 'General Alarm Drill' periodic control; -) Perform a re-training of the members of the Security Advisor Internal Committee (CIAS) on the Internal and External Aspects of the Emergency Plan and on the related procedures; -) Test the Emergency Communications System. New goals are added every year, considering the Drill's scope. This drill comprises two different kinds of practices: Internal practices (practices in the station, with our personnel) and external practices (practices outside the station with governmental organizations). Internal practices comprise: -) Internal and external communications practices; -) Acoustic alarms; -) Personnel gathering in the Meeting Points; -) Safety of selected Meeting Points; -) Personnel count, selective evacuation; -) Iodide Potassium pills distribution; -) CICE (Internal Group for Emergency Control) Coordination. External practices comprise: -) Nuclear Regulatory Authority; -) Argentine Navy, Comando Area Naval Fluvial, Base Naval Zarate; -) Lima firemen; -) Zarate firemen; -) Municipal Civil Defense (Zarate and Lima); -) National Guard, Escuadron Atucha; -) Zarate Regional Hospital; -) Lima Police Department; -) Zarate Police Department; -) Argentine Coast Guard, Zarate; -) Local radios: Radio FM Libre, FM El Sitio; -) First Aid clinic. The following activities are performed together with the aforementioned organizations: -) Formation of an 'Operative committee'; -) Evacuation of citizens in a 3 km radio; -) Control of every access to Lima; -) Control of

  17. Decommissioning of NPP A-1 Phase I, Jaslovske Bohunice. Documentation for application for permission to Phase II of decommissioning of NPP A-1. Schedule stage II of decommissioning of NPP A-1

    International Nuclear Information System (INIS)

    2007-04-01

    In this study documentation for application for permission to Phase II of decommissioning of NPP A-1 and the schedule stage II of decommissioning of NPP A-1 are presented. This study consists of ten appendixes.

  18. Atmospheric radionuclide deposits biomonitoring in the neighbourhood of NPP Temelin in the year 2000

    International Nuclear Information System (INIS)

    Cechak, T.; Kluson, J.; Smejkalova, M.; Thinova, L.; Trojek, T.

    2001-01-01

    In this paper the results of bio-monitoring of atmospheric radionuclide deposits in the neighbourhood of NPP Temelin in the year 2000 are presented.Monitored area contained 27 sampled locations along eight radial profiles interesting the area of interest up to distance of 20 km from NPP Temelin (the measuring points are located 2-5-10-20 km form NPP). The samples were taken from forest humus, surface pine bark, Shreber moss, edible mushrooms and forest berries.The pine bark and moss were sampled at the selected sites twice yearly , at spring and fall of 2000, forest humus once in spring month of 2000, mushrooms and berries once in a growing season of 2000. In total 203 samples were collected. For the determination of radionuclide presence and their activity in samples was selected a method of Iaboratory gamma spectroscopy. The measured values corresponded to nominal values on natural background, depending mainly of geological substrata (soil contents), concentration of radon in soil or air etc. The methodology selected enables identification of individual contaminants and their contribution or occurrence. With the exception of the identified 137 Cs it is not possible to identify among the measured spectra any significant contribution of any other radionuclides

  19. The contract for the completion and commissioning of Cernavoda NPP - Unit

    International Nuclear Information System (INIS)

    2001-01-01

    On May 18, 2001 the commercial contract for the completion and commissioning of the Cernavoda NPP Unit 2 has been signed by Nuclearelectrica National Company (SNN SA) and its partners, AECL-Canada and ANSALDO-Italy. This contract represents a continuation of the cooperation with AECL-Canada (the owner of the licence and the designer of the nuclear part of Cernavoda NPP Unit1) and ANSALDO-Italy (the designer of the conventional part of Cernavoda NPP Unit1). The completion is scheduled to last for 54 months (4.5 years) since the date the contract takes effect and the nuclear reactor start-up (the first criticality) is scheduled for the 49 th month. The total negotiated cost for the completion was estimated to amount to 689 million dollars, against the 750 million dollars initially estimated. The works at the site will be managed by an integrated staff team of specialized personnel form AECL-Canada (111 positions), ANSALDO-Italy (72 positions) and Romania (1200 positions)

  20. IAEA activities on NPP personnel training and qualification

    International Nuclear Information System (INIS)

    Kossilov, A.

    1998-01-01

    Activities of IAEA concerning training and qualification of NPP personnel consider the availability of sufficient number of competent personnel which is one of the most critical requirements for safe and reliable NPP operation and maintenance. Competence of personnel is essential for reducing the frequency of events connected to human errors and equipment failures. The IAEA Guidebook on Nuclear Power Plant Personnel Training and its Evaluation incorporates the experience gained worldwide and provides recommendations on the use of SAT being the best practice for attaining and maintaining the qualification and competence of NPP personnel and for quality assurance of training

  1. NPP Krsko Containment Response Following Main Steam Line Break

    International Nuclear Information System (INIS)

    Spalj, S.; Grgic, D.; Cavlina, N.

    2000-01-01

    This paper presents the calculation of thermohydraulic environmental parameters (pressure and temperature) inside containment of Krsko NPP after postulated Main Steam Line Break (MSLB) accident. This analysis was done as a part of the ambient parameters specification in the frame of the NPP Krsko Equipment Qualification (EQ) project. The RELAP5/mod2 computer code was used for the determination of MSLB mass and energy release and computer code GOTHIC was used to calculate pressure and temperature profiles inside NPP Krsko containment. The analysis was performed for spectrum of break sizes to account for possible steam superheating during accidents with smaller break sizes. (author)

  2. A reliability evaluation method for NPP safety DCS application software

    International Nuclear Information System (INIS)

    Li Yunjian; Zhang Lei; Liu Yuan

    2014-01-01

    In the field of nuclear power plant (NPP) digital i and c application, reliability evaluation for safety DCS application software is a key obstacle to be removed. In order to quantitatively evaluate reliability of NPP safety DCS application software, this paper propose a reliability evaluating method based on software development life cycle every stage's v and v defects density characteristics, by which the operating reliability level of the software can be predicted before its delivery, and helps to improve the reliability of NPP safety important software. (authors)

  3. Construction of large-thickness sand cushions for NPP foundations

    International Nuclear Information System (INIS)

    Krantsfel'd, Ya.L.; Losievskaya, I.K.; Kovalenko, R.P.; Mutalipov, A.

    1982-01-01

    A study is made on some technological peculiarities of preparation of NPP foundations and control methods of foundation density. As an example the experience of cement-sand foundation construction for two 900 MW power-units at the Koeberg South Africa NPP is briefly described. The experience of artificial foundation construction at this NPP indicates both the possibility of obtaining the required quality of cement-sand cushions and commercial construction of large volume of such cushions by acceptable rates and the necessity of unification of work quality characteristics

  4. NPP Cernavoda Unit 2 Financing Completion Works

    International Nuclear Information System (INIS)

    Chirica, T.; Stefanescu, A.; Constantin, C.; Dobrin, M.

    2002-01-01

    NPP Cernavoda Unit 2 completion is the highest priority of the Romanian power sector strategy. The nuclear energy represents, through its technological features of adopted solution (a CANDU nuclear power plant) and also through technological and economical performance indicators, the best solution to fulfill the demands concerning the sustainable development and the electricity request. The guidelines of energy strategy regarding the nuclear sector development in Romania are framing in the general policy for energy system development at least costs and they are responding to requests concerning the environment and people protection. The paper presents the financing alternatives for Unit 2 completion works taking into consideration the financing market conditions. The paper presents the impact of the financing conditions on the project efficiency, as well as the facilities offered by the Romanian Government in order to support this project. (author)

  5. Fuel consumption organization at the Kola NPP

    International Nuclear Information System (INIS)

    Matveev, A.A.; Ignatenko, E.I.; Volkov, A.P.; Trofimov, B.A.

    1981-01-01

    Problems of using NPPs in the power systems including hydroelectric power plants and NPPs are considered on the example of the Kola power system. The methods of the WWER-440 reactor fuel loading formation, reactor power forcing, optimization of volumes and time of the NPP main equipment planned maintenance are discussed. It is concluded that the optimal methods for the WWER-440 reactor fuel loading formation are the following: reactor make-up with the lesser number of fuel assemblies with maximum designed enrichment; for the case of decreased loading energy capacity displacement of make-up fuel with 2.4% enrichment by the fuel with 3.6% enrichment when preserving the designed number of make-up fuel assemblies [ru

  6. Feature article. Fukushima Daiichi NPP accident

    International Nuclear Information System (INIS)

    Ekarinai, Masashi; Ake, Yutaka; Narabayashi, Tadashi

    2011-01-01

    This special feature article consisted of five reports and the minutes of emergency discussion meeting on Fukushima Daiichi Nuclear Power Plant (NPP) accident. Effects of the accident on future electricity supply of electric utilities and also on business development of nuclear industries were discussed. Activities of senior network team of atomic energy society of Japan (AESJ) to conduct severe accident analysis and early restoration from the accident were introduced. Circulating injection reactor cooling system and zeolite decontamination system of accumulated contaminated water was proposed. Effects of the accident on overseas reaction on nuclear development were also reported as well as personal experience of the professor in the US west coast on communications. (T. Tanaka)

  7. N-16 monitors: Almaraz NPP experience

    International Nuclear Information System (INIS)

    Adrada, J.

    1997-01-01

    Almaraz Nuclear Power Plant has installed N-16 monitors - one per steam generator - to control the leakage rate through the steam generator tubes after the application of leak before break (LBB) criteria for the top tube sheet (TTS). After several years of operation with the N-16 monitors, Almaraz NPP experience may be summarized as follows: N-16 monitors are very useful to follow the steam generator leak rate trend and to detect an incipient tube rupture; but they do not provide an exact absolute leak rate value, mainly when there are small leaks. The evolution of the measured N-16 leak rates varies along the fuel cycle, with the same trend for the 3 steam generators. This behaviour is associated with the primary water chemistry evolution along the cycle

  8. Students education and training for Slovak NPP

    International Nuclear Information System (INIS)

    Slugen, V.; Lipka, J.; Hascik, J.; Miglierini, M.

    2005-01-01

    Slovak University of Technology is the largest and also the oldest university of technology in Slovakia. It is certain that more than 50% of the highly-educated technicians who are currently working in the nuclear industry have graduated from this university. The Department of Nuclear Physics and Technology of the Faculty of Electrical Engineering and Information Technology as one of the seven faculties of this University feels the responsibility to impart proper engineering education and training for Slovak NPP operating staff. The education process is realised via undergraduate (BSc), graduate (MSc) and postgraduate (PhD) study as well as via specialised training courses within the framework of a continuous education system. (author)

  9. Features of the Kozloduy NPP management system

    International Nuclear Information System (INIS)

    2016-01-01

    The Kozloduy NPP management system was built taking into account the specifics of the organizational structure and management of the Company, actual processes and practices, and is oriented towards future development, with the participation of all staff. Additional requirements integrated in the system that distinguish it from general industrial requirements of management systems are: priority of nuclear safety; safety culture; knowledge management including extraction and storage of 'hidden knowledge'; periodic self-assessments; use of graded response to the products and activities; use of 'conservative approach' in decision making;; possibilities for self learning and creating of a vision of 'leaders' and 'professional workers in nuclear energy

  10. Concreting organization during Chernobylsk NPP construction

    International Nuclear Information System (INIS)

    Lysyuk, R.I.; Kareva, A.P.

    1984-01-01

    Conreting organization during the Chernobylsk NPP construction is described. Processes of extra heavy concrete production and placement, which specific mass constitutes 4t/m 3 at the age of 28 days wiath metallic aggregates and 3.3-3.5 t/m 3 at the same age without aggregates, are considered in short. Basic characteristics of this concrete are presented. At the 4th power unit labour contents for construction works were a 1.5 times lower as compared to the 3rd power unit erection. This progress was achieved by round-the-clock operation of the concrete plant with the 800 m 3 /day output and also by utilization of special equipment for mechanized concrete placement: concrete pumps, automatic concrete mixer, manipulators and concrete pipelines

  11. Construction of Belene NPP in Bulgaria

    International Nuclear Information System (INIS)

    JSC Atomstroyexport

    2010-01-01

    Presentations concluding remarks: ASE has performed its scope of responsibilities under the Agreement of 29.11.2006 and has achieved great results regarding both the Technical part of the Project and its organization; Though there is a number of unsettled issues under the Project, in particular, the issue related to financing, ASE is willing to continue the Project and works on its development; The Russian Party believes that in case the activities under the Project are continued, Belene NPP will be constructed with high quality and within the time limits prescribed in the Agreement of 29.11.2006: 59 months before Unit 1 take-over into operation and 71 month before Unit 2 take-over into operation, starting from concreting of foundation slab of Unit 1 Reactor building

  12. Electrohydraulic system to control NPP turbines

    International Nuclear Information System (INIS)

    Kosyak, Yu.F.; Virchenko, M.A.; Rozhanskij, V.E.; Rokhlenko, V.Yu.; Gapunin, A.Ya.; Zhornitskaya, T.Ya.; Rasskazov, I.Eh.; Butsenko, V.N.; Brajnin, L.S.; Makarenko, N.I.

    1985-01-01

    Operation regimes of electrohydraulic regulation system (EHRS) of NPP turbines, designed to control the turbine in start-up and working conditions, have been decribed. In start-up regimes EHRS ensures the testing of control valves of the turbine, the turn of the turbine from zero to the nominal rotation frequency (automatic, semiautomatic and manual regulation), turbine acceleration to test safety automatic systems, gradual change in rotation frequency during generator synchronization with circuit. Under working conditions EHRS ensures the maintenance of frequency, power and vapour pressure before the turbine. A block diagram of EHRS is presented. Sensors and electronic part of EHRS are supplied with triple reservation, which ensures a high relaibility of the system

  13. Detection of primary coolant leaks in NPP

    International Nuclear Information System (INIS)

    Slavov, S.; Bakalov, I.; Vassilev, H.

    2001-01-01

    The thermo-hydraulic analyses of the SG box behaviour of Kozloduy NPP units 3 and 4 in case of small primary circuit leaks and during normal operation of the existing ventilation systems in order to determine the detectable leakages from the primary circuit by analysing different parameters used for the purposes of 'Leak before break' concept, performed by ENPRO Consult Ltd. are presented. The following methods for leak detection: measurement of relative air humidity in SG box (can be used for detection of leaks with flow rate 3.78 l/min within one hour at ambient parameters - temperature 40 0 - 60 0 C and relative humidity form 30% to 60%); measurement of water level in SG box sumps (can not be used for reliable detection of small primary circuit leakages with flow rate about 3.78 l/min); measurement of gaseous radioactivity in SG box( can be used as a general global indication for detection of small leakages from the primary circuit); measurement of condensate flow after the air coolers of P-1 venting system (can be used for primary circuit leak detection) are considered. For determination of the confinement behaviour, a model used with computer code MELCOR has been developed by ENPRO Consult Ltd. A brief summary based on the capabilities of the different methods of leak detection, from the point of view of the applicability of a particular method is given. For both Units 3 and 4 of Kozloduy NPP a qualified complex system for small leak detection is planned to be constructed. Such a system has to unite the following systems: acoustic system for leak detection 'ALUS'; system for control of the tightness of the main primary circuit pipelines by monitoring the local humidity; system for primary circuit leakage detection by measuring condensate run-off in collecting tank after ventilation system P-1 air coolers

  14. Plant performance monitoring program at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Kavsek, D.

    2004-01-01

    A high level of nuclear safety and plant reliability results from the complex interaction of a good design, operational safety and human performance. This is the reason for establishing a set of operational plant safety performance indicators, to enable monitoring of both plant performance and progress. Performance indicators are also used for setting challenging targets and goals for improvement, to gain additional perspective on performance relative to other plants and to provide an indication of a potential need to adjust priorities and resources to achieve improved overall plant performance. A specific indicator trend over a certain period can provide an early warning to plant management to evaluate the causes behind the observed changes. In addition to monitoring the changes and trends, it is also necessary to compare the indicators with identified targets and goals to evaluate performance strengths and weaknesses. Plant Performance Monitoring Program at Krsko NPP defines and ensures consistent collection, processing, analysis and use of predefined relevant plant operational data, providing a quantitative indication of nuclear power plant performance. When the program was developed, the conceptual framework described in IAEA TECDOC-1141 Operational Safety Performance Indicators for Nuclear Power Plants was used as its basis in order to secure that a reasonable set of quantitative indications of operational safety performance would be established. Safe, conservative, cautious and reliable operation of the Krsko NPP is a common goal for all plant personnel. It is provided by continuous assurance of both health and safety of the public and employees according to the plant policy stated in program MD-1 Notranje usmeritve in cilji NEK, which is the top plant program. Establishing a program of monitoring and assessing operational plant safety performance indicators represents effective safety culture of plant personnel.(author)

  15. Indicators to monitor NPP operational safety performance

    International Nuclear Information System (INIS)

    Gomez-Cobo, Ana

    2002-01-01

    Since December 1995 the IAEA activities on safety performance indicators focused on the elaboration of a framework for the establishment of an operational safety performance indicator programme. The development of this framework began with the consideration of the concept of NPP operational safety performance and the identification of operational safety attributes. For each operational safety attribute, overall indicators, envisioned as providing an overall evaluation of relevant aspects of safety performance, were established. Associated with each overall indicator is a level of strategic indicators intended to provide a bridge from overall to specific indicators. Finally each strategic indicator was supported by a set of specific indicators, which represent quantifiable measures of performance. The programme development was enhanced by pilot plant studies, conducted over a 15 month period from January 1998 to March 1999. The result of all this work is compiled in the IAEA-TECDOC-1141, to be published shortly. This paper presents a summary of this IAEA TECDOC. It describes the operational safety performance indicator framework proposed and discusses the results of and lessons learned from the pilot studies. Despite the efforts described, it is clear that additional research is still necessary in areas such as plant-specific adaptation of proposed frameworks in order to suit individual data collection systems and plant characteristics, indicator selection, indicator definition, goal setting, action thresholds, analysis of trends, indicator display systems, analysis of overall safety performance (i.e., aggregation or combination of indicators), safety culture indicators, qualitative indicators, and use of additional indicators to address issues such as industrial safety attitude and performance, staff welfare, and environmental compliance. This is the rationale for a new IAEA Coordinated Research Project on 'Development and application of indicators to monitor NPP

  16. Training change control process at Cernavoda NPP

    International Nuclear Information System (INIS)

    Valache, Cornelia Mariana

    2005-01-01

    The paper presents the process of 'Training Change Control' at Cernavoda NPP. This process is a systematic approach that allows determination of the most effective training and/or non-training solutions for challenges that may influence the content and conditions for a training program or course. Changes may be the result of: - response to station systems or equipment modifications; - new or revised procedures; - regulatory requirements; - external organizations requirements; - internal evaluations meaning feedback from trainees, trainers, management or post-training evaluations; - self-assessments; - station condition reports; - operating experience (OPEX); - modifications of job scope; - management input. The Training Change Control Process at Cernavoda NPP includes the following aspects. The first step is the identification of all the initiating factors for a potential training change. Then, retain only those, which could have an impact on training and classify them in two categories: as deficiencies or as enhancement suggestions. The process is different for the two categories. The deficiency category supposes the application of the Training Needs Analysis (TNA) process. This is a performance-oriented process, resulting in more competent employees, solving existing and potential performance problems. By using needs analysis to systematically determine what people or courses and programs are expected to do and gathering data to reveal what they are really doing, we can receive a clear picture of the problem and then we can establish corrective action plans to fix it. The process is supported by plant subjects matter and by training specialists. On the other hand, enhancements suggestions are assessed by designated experienced persons and then are implemented in the training process. Regarding these two types of initiating factors for the training change control process, the final result consists of a training improvement, raising the effectiveness, efficiency or

  17. Digital Components in Swedish NPP Power Systems

    International Nuclear Information System (INIS)

    Karlsson, Mattias; Eriksson, Tage

    2015-01-01

    Swedish nuclear power plants have over the last 20 years of operation modernised or exchanged several systems and components of the electrical power system. Within these works, new components based on digital technology have been employed in order to realize functionality that was previously achieved by using electro-mechanical or analogue technology. Components and systems such as relay protection, rectifiers, inverters, variable speed drives and diesel-generator sets are today equipped with digital components. Several of the systems and components fulfil functions with a safety-role in the NPP. Recently, however, a number of incidents have occurred which highlight deficiencies in the design or HMI of the equipment, which warrants questions whether there are generic problems with some applications of digital components that needs to be addressed. The use of digital components has presented cost effective solutions, or even the only available solution on the market enabling a modernisation. The vast majority of systems using digital components have been operating without problems and often contribute to improved safety but the challenge of non-detectable, or non-identifiable, failure modes remain. In this paper, the extent to which digital components are used in Swedish NPP power systems will be presented including a description of typical applications. Based on data from maintenance records and fault reports, as well as interviews with designers and maintenance personnel, the main areas where problems have been encountered and where possible risks have been identified will be described. The paper intends to investigate any 'tell-tales' that could give signals of unwanted behaviour. Furthermore, particular benefits experienced by using digital components will be highlighted. The paper will also discuss the safety relevance of these findings and suggest measures to improve safety in the application of digital components in power systems. (authors)

  18. Requirements on qualification, competence and sufficient number of personnel for NPP operation

    International Nuclear Information System (INIS)

    Simon, M.

    2004-01-01

    The safe operation of NPPs presupposes qualified personnel on site in sufficient numbers. While the acquisition and preservation of technical expertise and the qualification of the shift personnel and other staff is well regulated by regulatory guidelines in Germany, there is a lack of such regulations with the exception for shift personnel - for the minimum number of technical personnel required for safe operation of a NPP. By order of the BMU, an attempt was made with this study to work out the requirements for qualification, competence and number of personnel to be maintained at the plant, representing the minimum requirements for safe operation of a NPP. The scope of the project was restricted to requirements for technical plant personnel. The aim was to work out requirements which would be as independent as possible of the existing organisation in a particular power plant. This study therefore does not assume a given organisational structure but was rather more oriented on the work processes in a NPP which are the basis for planning and performing routine work in the plant. For the study a work process model of typical tasks in a NPP had to be developed. Then, the tasks to be performed within the so defined work processes were described (task profiles) on the basis of existing manuals for plant organisation. From these task profiles such tasks were defined or selected which shall not be delegated to external personnel for specific reasons, and which were called vital competences. To keep these vital competences at the plant, an assessment and/or calculation of the necessary number of plant technical personnel was made using the task profiles for responsible personnel, but also by the evaluation of thousands of work orders for maintenance personnel. On the basis of these data, a proposal was made for the minimal number of technical personnel which is necessary to operate a NPP unit safely. Beside of this number, general criteria were developed which should be

  19. Radiological characterisation of V1 NPP technological systems and buildings - Activation

    International Nuclear Information System (INIS)

    Kristofova, Kristina; Rapant, Tibor; Svitek, Jaroslav

    2012-01-01

    V1 NPP at Jaslovske Bohunice site has been finally shutdown after 28 years of successful operation in 2006 (Unit 1) and 2008 (Unit 2). At present, both units are finally shutdown and since July 2011 under decommissioning license. The preparation of V1 NPP decommissioning has been supported and partly financed by the Bohunice International Decommissioning Support Fund (BIDSF), under the administration of the European Bank for Reconstruction and Development. From 06/2008 to 12/2011 AMEC Nuclear Slovakia, together with partners STM Power and EWN GmbH, carried out BIDSF B6.4 project - Decommissioning database development (DDB). The main purpose of the B6.4 project was to develop a physical and radiological inventory database to support V1 NPP decommissioning process planning and performance. One of the specific deliverable tasks within the B6.4 project was deliverable D12 - Characterization of activated equipment and civil structures based on measurement, sampling and analyses performed on the samples. The scope of deliverable services within D12 task consisted of: 1. Categorization of activated components ; 2. Development of single working programs for their radiological monitoring and sampling ; 3. Preparation of sampling device and revision of all handling equipment; 4. Dose rate monitoring and sampling of: - Civil structures from reactors shaft on both units ; - Components placed in HLW storage, (so called 'Mogilnik') - connection rods, absorbers ; of control rod assemblies and neutron flux measurement channels ; - Reactor pressure vessel and shielding assemblies at both units of V1 NPP, reactor; internals from Unit 2 of V1 NPP; 5. Analysis of samples ; 6. Determination of radiological inventory ; 7. Import of radiological data for activated components into DDB. During sampling, mainly remotely controlled sampling device and radiation resistant camera with LED lightening for visual checking of all performed activities was used. In total, 125 samples have been taken

  20. Cofrentes NPP activities on PSA and severe accident analysis

    International Nuclear Information System (INIS)

    Suarez, J.; Borondo, L.; Garcia, P.J.

    1996-01-01

    Cofrentes NPP (CNPP) has developed a Level 1 PSA with the following scope: analysis of internal events, with the reactor initially operating at power, internal and external flooding risk analysis; internal fire risk analysis; reliability analysis of the containment heat removal and containment isolation systems. Level 1 CNPP-PSA results reveal that total core damage frequency in CNPP is less than other similar BWR/6 plants. The CNPP-PSA related activities and applications being carried out currently are: adjusting of MAAP 3.0B, revision 10, on VAX and PC; acquisition of MAAP 4; development of Level1/Level2-PSA interface; seismic site categorization for the IPEEE; prioritization of motor operated valves related to GL-89/10, complementary analysis for exemption to some 10CFR50 App. J requirements; Q-List grading; reliability-centered maintenance; maintenance rule support; on-line maintenance support, off-line risk-monitor development, PSA applicability to the 10CFR50 App. R requirements, analysis of the frequency of mis-oriented fuel bundle event, etc. About severe accident management, CNPP, as part of the Spanish-BWROG, is currently analyzing the generic products of the US-BWROG AMG in order to generate their specific ones. Also, in this group BWR, the development of tools to simulate accident scenarios beyond core damage will be studied and a training process oriented to warrant the optimum use of new EOP/AMG in accident scenarios will be implemented

  1. NPP Tropical Forest: Chamela, Mexico, 1982-1995, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set contains five data files (.txt format). Three data files provide net primary productivity (NPP) estimates for a tropical dry deciduous forest within...

  2. NPP Mochovce units 1 and 2 diagnostic systems

    International Nuclear Information System (INIS)

    Heidenreich, S.

    1997-01-01

    In this paper the diagnostic systems (leak detection monitoring, vibration monitoring, lose parts monitoring, fatigue monitoring) of NPP Mochovce units 1 and 2 are presented. All of the designed diagnostic systems are personal computer based systems

  3. Seismic re-evaluation process in Medzamor-2 NPP

    International Nuclear Information System (INIS)

    Zadoyan, P.

    2000-01-01

    Seismic re-evaluation process for Medzamor-2 NPP describes the following topics: program implementation status; re-evaluation program structure; regulatory procedure and review plan; current tasks and practice; and regulatory assessment and research programs

  4. NPP Grassland: Montecillo, Mexico, 1984-1994, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides three data files in text format (.txt). One file contains monthly biomass measurements and net primary productivity (NPP) estimates made...

  5. Application of neutral-oxygen water regime at NPP

    International Nuclear Information System (INIS)

    Kruzhilin, G.N.; Dubrovskij, I.S.; Anan'ev, E.P.; Matskevich, E.B.; Gashenko, V.A.; Abakumova, O.N.

    1985-01-01

    A problem of using neutral-oxyoen water regime at NPP is considered. Data on the successful application of such regime at a national NPP with the VK-50 reactor and at some foreign NPP are given. It is noted that oxygen dissolved in a saltless water flow becomes a steel passivating agent forming a strong oxide film on surfaces of stainless- and carbon steels. After the film formation almost complete inhibition of the oxidation and corrosion processes is observe. The conclusion is drawn on the expediency of using the neutral-oxygen water regime at all the NPP equipped with condensate cleaning devices as well as on a wider use of carbon steels

  6. Preparation of Long Term Operation in Dukovany NPP, Czech Republic

    International Nuclear Information System (INIS)

    Krivanek, R.; Sabata, M.

    2012-01-01

    Dukovany NPP in the south-east of the Czech Republic operates four VVER 440/213 type units. The first unit was commissioned in 1985 and the last one in 1987. The operational results of the whole NPP have been excellent and NPP permanently belongs between the first quartile of the best operated NPPs in the world in accordance with WANO factors. Large safety improvement programme have been implemented in last 15 years. The original design lifetime of main components is 30 years which means till 2015 and it is understandable that NPP is preparing for long-term operation (LTO). The paper is describing activities carried out and planned for safe and successful LTO. (author)

  7. VIIRS/NPP On Board Calibrator (OBC) IP NRT

    Data.gov (United States)

    National Aeronautics and Space Administration — The VIIRS Level 1 and Level 2 swath products are generated from the processing of 6 minutes of VIIRS data acquired during the NPP satellite overpass. The VIIRS...

  8. ISLSCP II Global Primary Production Data Initiative Gridded NPP Data

    Data.gov (United States)

    National Aeronautics and Space Administration — Net Primary Production (NPP) is an important component of the carbon cycle and, among the pools and fluxes that make up the cycle, it is one of the steps that are...

  9. Benchmarking HRA methods against different NPP simulator data

    International Nuclear Information System (INIS)

    Petkov, Gueorgui; Filipov, Kalin; Velev, Vladimir; Grigorov, Alexander; Popov, Dimiter; Lazarov, Lazar; Stoichev, Kosta

    2008-01-01

    The paper presents both international and Bulgarian experience in assessing HRA methods, underlying models approaches for their validation and verification by benchmarking HRA methods against different NPP simulator data. The organization, status, methodology and outlooks of the studies are described

  10. Summary of NPP personnel training in Czech Republic

    International Nuclear Information System (INIS)

    1996-01-01

    The preparation of NPP personnel is one of the most important phases of the process of construction, commissioning, operation and maintenance of nuclear power facilities. The objective is to improve personnel abilities so that they would be able to assure reliable, safe and economic operation of these facilities with high investment costs. It is the purpose of Nuclear Training Centre Brno (NTC Brno) to provide training and services which are responsive to the technological demands and emerging educational standards and criteria of the NPP and the nuclear industry. Fulfilling this purpose is a challenging task. The staff of NTC Brno, in a joint effort with NPP Dukovany and NPP Temelin, has responded to the challenge with comprehensive programs aimed at meeting customers needs. The programs are broadly based, yet flexible so that they can incorporate specific customer requirements

  11. NPP Tropical Forest: Darien, Panama, 1967-1968, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This NPP data set contains one ASCII file (.txt format). The data file contains above- and below-ground biomass, litterfall, LAI, vegetation/soil micro-nutrient...

  12. Introduction of the SAT based training programs at Paks NPP

    International Nuclear Information System (INIS)

    Kiss, I.

    1998-01-01

    An introduction of the SAT based training programs at Paks nuclear power plant is described in detail, including framework of project operation; project implementation; process of SAT applied at Paks NPP and the needs of its introduction

  13. HANPP Collection: Global Patterns in Net Primary Productivity (NPP)

    Data.gov (United States)

    National Aeronautics and Space Administration — The Global Patterns in Net Primary Productivity (NPP) portion of the Human Appropriation of Net Primary Productivity (HANPP) Collection maps the net amount of solar...

  14. HANPP Collection: Global Patterns in Net Primary Productivity (NPP)

    Data.gov (United States)

    National Aeronautics and Space Administration — The Global Patterns in Net Primary Productivity (NPP) portion of the HANPP Collection maps the net amount of solar energy converted to plant organic matter through...

  15. The psychological background about human error and safety in NPP

    International Nuclear Information System (INIS)

    Zhang Li

    1992-01-01

    A human error is one of the factors which cause an accident in NPP. The in-situ psychological background plays an important role in inducing it. The author analyzes the structure of one's psychological background when one is at work, and gives a few examples of typical psychological background resulting in human errors. Finally it points out that the fundamental way to eliminate the unfavourable psychological background of safety production is to establish the safety culture in NPP along with its characteristics

  16. Quantitative analysis of psychological personality for NPP operators

    International Nuclear Information System (INIS)

    Gao Jia; Huang Xiangrui

    1998-01-01

    The author introduces the relevant personality quantitative psychological research work carried out by 'Prognoz' Laboratory and Taiwan, and presents the primary results of the research for Chinese Nuclear Power Plant (NPP) operator's psychological personality assessment, which based on the survey of MMPI, and presents the main contents for the personality quantitative psychological research in NPP of China. And emphasizes the need to carry out psychological selection and training in nuclear industry

  17. Framatome Contribution to Chinese NPP Development and Standardization

    International Nuclear Information System (INIS)

    Charbonneau, S.

    1996-01-01

    First discussions in 1978 between Framatome and Chinese authorities about the supply of an NPP were successfully concluded in 1986 by the signature of the supply contracts (nuclear islands, conventional islands, nuclear fuel assemblies, and project management assistance) for the Daya Bay NPP. Since then teams of engineers and technicians from Framatome and other French companies, and from relevant Chinese institutes and agencies have gotten to know each other better and have deepened their relationships

  18. Morbidity with temporary disability in Kozloduy NPP workers

    International Nuclear Information System (INIS)

    Dobreva, B.; Novkirishki, V.

    1993-01-01

    Changes with time in indicators of disease incidence with temporary disability in Kozloduy NPP personnel have been studied for the period 1974-1991. The data were compared with those for 'Sofia-Iztok' TPP. The causes contributing to formation of the indicators of frequency, severity, and average duration were examined. No temporary disability because of radiation exposure has been recorded. As a whole, less temporary disability has been found at NPP than at TPP. (author)

  19. Some aspects of licensing procedures for NPP operation in USA

    International Nuclear Information System (INIS)

    Isaev, A.N.

    2002-01-01

    Structure of the Code of Federal Regulations of USA is reviewed, aspects of licensing for NPP operation in USA associated with licensing procedures for service of NPP, prolongation of license as well as introduction of changes in prevailing licenses using risk-informed decisionmaking method are outlined. Fundamental stages of decision making with risk assessment for the particular station as well as values of acceptability for the frequency evaluation of reactor core disruption and large early discharges are presented [ru

  20. Computerized systems of NPP operators support. (Psychological problems)

    International Nuclear Information System (INIS)

    Mashin, V.A.

    1995-01-01

    Operator psychological problems arising in the work with NPP operators support computerized systems (OSCS) are considered. The conclusion is made that the OSCS intellectual application will bring the operator into dangerous dependence on his computerized assistant. To avoid this danger it is necessary by creation of the OSCS to divide specially the tasks areas of the operator and OSCS in order to assure the active role of the operator in the NPP control

  1. Status of the spent fuel dry storage programme for Cernavoda NPP

    International Nuclear Information System (INIS)

    Radu, M.

    1999-01-01

    The Cernavoda NPP Unit 1 (600 MWe Standard type) is in operation since December 1996. Within the framework of the R and D Radioactive Waste and Spent Fuel Management Programme, investigations, studies and research are carried out on site identification and conceptual designs for both a Spent Fuel Interim Storage Facility and a Spent Fuel Disposal Facility. The status of the work performed in the framework of this programme as well as the situation of the spent fuel resulting from the Research Institutes will be presented in the paper. (author)

  2. EPC projects for EPR Flamanville 3 NPP

    International Nuclear Information System (INIS)

    Diaz, J.I.; Polo, J.; Aymerich, E.; Cubian, B.

    2010-01-01

    IBERDROLA Ingenieria y Construccion is carrying out a handful of activities in the EPR Flamanville 3 -FA3 NPP- context since 2007 matching oriented to position the company in the emerging marketplace of new nuclear power plants Generation III+, whose expectation for the next years is highly promising. IBERDROLA Ingenieria y Construccion leads 5 EPC -Engineering, Procurement and Commissioning- projects for FA3 NPP from the Nuclear Island till Sea Water Pumping Station as follows: - Design, procurement. fabrication, installation and testing of 21 shell and tubes heat-exchangers for the nuclear island. 12 out of these 17 HXs are conventional and will be designed according to ASME BPV code Section VIII and have to comply with PED 97/23/CE and ESPN. The remaining 5 HXs are nuclear and will be designed according to ASME BPV code Section III and have also to comply with PED and ESPN. - Design, procurement, fabrication and assembly of 9 demineralizers for different plant systems. Three of these Important To Safety (IPS) equipments have been manufactured according with ASME VIII codes and six of them with EN 13445 code plus additional requirements to comply with PED and final client requirements for nuclear island. - Design, fabrication and installation of qualified travelling water screening filters. The equipments furnished will be two nuclear safety qualified filters and associated equipment (cleaning water system and control system). Additionally some auxiliary devices such as grids, automatic trash rakes and stop gates are included in the contract. - Engineering, procurement, fabrication, erection and commissioning for the condensate treatment plant. This system includes a demineralizer tank, 5 filters, reactive injection mixer, pneumatic and manual valves, piping and instrumentation and control systems. - Engineering, procurement erection and commissioning for the electro-chlorination plant to protect the IPS piping for Condensate Water System for FA3. This system

  3. EPC projects for EPR Flamanville 3 NPP

    Energy Technology Data Exchange (ETDEWEB)

    Diaz, J.I.; Polo, J.; Aymerich, E.; Cubian, B. [Nuclear Generation Department, Iberdrola Ingenieria y Construccion, Avda. Manoteras 20, 28050 Madrid (Spain)

    2010-07-01

    IBERDROLA Ingenieria y Construccion is carrying out a handful of activities in the EPR Flamanville 3 -FA3 NPP- context since 2007 matching oriented to position the company in the emerging marketplace of new nuclear power plants Generation III+, whose expectation for the next years is highly promising. IBERDROLA Ingenieria y Construccion leads 5 EPC -Engineering, Procurement and Commissioning- projects for FA3 NPP from the Nuclear Island till Sea Water Pumping Station as follows: - Design, procurement. fabrication, installation and testing of 21 shell and tubes heat-exchangers for the nuclear island. 12 out of these 17 HXs are conventional and will be designed according to ASME BPV code Section VIII and have to comply with PED 97/23/CE and ESPN. The remaining 5 HXs are nuclear and will be designed according to ASME BPV code Section III and have also to comply with PED and ESPN. - Design, procurement, fabrication and assembly of 9 demineralizers for different plant systems. Three of these Important To Safety (IPS) equipments have been manufactured according with ASME VIII codes and six of them with EN 13445 code plus additional requirements to comply with PED and final client requirements for nuclear island. - Design, fabrication and installation of qualified travelling water screening filters. The equipments furnished will be two nuclear safety qualified filters and associated equipment (cleaning water system and control system). Additionally some auxiliary devices such as grids, automatic trash rakes and stop gates are included in the contract. - Engineering, procurement, fabrication, erection and commissioning for the condensate treatment plant. This system includes a demineralizer tank, 5 filters, reactive injection mixer, pneumatic and manual valves, piping and instrumentation and control systems. - Engineering, procurement erection and commissioning for the electro-chlorination plant to protect the IPS piping for Condensate Water System for FA3. This system

  4. Dose assessments in nuclear power plant siting

    International Nuclear Information System (INIS)

    1988-03-01

    This document is mainly intended to provide information on dose estimations and assessments for the purpose of nuclear power plant (NPP) siting. It is not aimed at giving radiation protection guidance, criteria or procedures to be applied during the process of NPP siting nor even to provide recommendations on this subject matter. The document may however be of help for implementing some of the Nuclear Safety Standards (NUSS) documents on siting. The document was prepared before April 26, 1986, when a severe accident at the Unit 4 of Chernobyl NPP in the USSR had occurred. It should be emphasized that this document does not bridge the gap which exists in the NUSS programme as far as radiation protection guidance for the specific case of siting of NPP is concerned. The Agency will continue to work on this subject with the aim to prepare a safety series document on radiation protection requirements for NPP siting. This document could serve as a working document for this purpose. Refs, figs and tabs

  5. On-line maintenance at Cofrentes NPP

    International Nuclear Information System (INIS)

    Roldan Vilches, J.; Moreno Matarranz, M. A.; Hermana Mendioroz, I.

    1998-01-01

    Cofrentes NPP has begun in 1997 activities related to At Power Preventive Maintenance over trains or systems which lead to a voluntary entry in a Limitative Condition of Operation (LCO) of the Technical Specifications. From others benefits, this program ha improved the risk management and the staff's knowledge over the functions and safety implications of the different systems, the better exploit of the resources, the co-ordination of the different organisations involved (Maintenance an Operation) and the reductions of works during shutdowns. Previous to each work, a feasibility study analyzes qualitative and quantitative (PSA), using the Risk Monitor, the implications on safety of all the tasks, assuring that the global safety of the Plant is always maintained. Tech. Spec. are analyzed in detail and also are analyzed situations of simultaneous unavailabilities of systems which could lead to a high risk situation. Two different risk controls are defined (punctual and accumulated) to assure that high risk situations will not be given. Finally, historical risk profile is analyzed to assure that the accumulated risk increase is not significant. Risk Monitor helps staff in the schedule and follow-up of the activities of On-Line Maintenance. Each one of the tasks are deeply planned and harshly analyzed and are carried out by high qualified workers. By the moment, this program is running with fully satisfaction on the Plant. (Author)

  6. Instrumentation database specific to Trillo I NPP

    International Nuclear Information System (INIS)

    Pereira Pagan, M.B.; Saenz de Tejada, P.; Fernandez Alvarez, A.; Haya, J.

    1997-01-01

    The analysis of data on electronic instrumentation components in the Trillo I PSA has involved and extra effort, basically due to the particular characteristics of these equipment items. This analysis has different aspects depending on the type of information used: Components whose data have been obtained from generic information sources (with or without Bayesian processing). Components whose data have been obtained from specific German studies (TUV) Components whose data have been based directly on the historical experience of Trillo I NPP Components whose data have been based on miscellaneous generic and specific sources This information can also be classified into: Micro components formed by a single module ar card Micro components: formed by set of instrumentation elements It can be further subdivided according to the operating conditions of the components: Equipment whose operation depends on the functions they perform in a particular system (eg. reactor protection system instrumentation channels) Equipment whose operation is not associated with particular conditions (eg. modules for motor-operated equipment). (Author)

  7. Intranet portal at the Krsko NPP, Slovenia

    International Nuclear Information System (INIS)

    2009-01-01

    The intranet portal (named IntraNEK) at Krsko NPP serves as a single entry point to access the internet and various plant applications and links. The front page consists of the standard internet search bar and links to various applications that can either reside within the technological computer network (TRM) or within the plant business computer network. Access to the TRM applications is read only. Some applications on the business computer network are open to all personnel who log on to the network while some applications are restricted and secured, and require additional login entries. A selected link will open in a new window. Documents will open with the appropriate software tool depending on the document file format. Some categories of documents are available in image form only (e.g. procedures, drawings etc.), while some are available in fully searchable PDF format (e.g. technical specifications, updated safety analysis reports (USARs) etc.). Plant departments (organizational units) have their own pages accessible from the front page. Their pages contain links to their own information resources or links to other resources and applications, tailored to the department needs. During recent years a number of web based applications have been developed that are connected also with a common Oracle database. Some are designed to serve for data entry and browsing while others serve for browsing only

  8. Processing of exhausted resins for Trino NPP,

    International Nuclear Information System (INIS)

    Benvenuto, F.; Bitetti, G.; Maggini, F.; Scarsi, G.

    2009-01-01

    Decomposition of organic compounds contained in the spent ion exchange resins is considered effective in reducing the waste volume. A system using the wet-oxidation process has been studied for the treatment of the spent resins stored at Trino Nuclear Power Plant owned by SOGIN. Compared with various processes for treating sludge and resin, the wet-oxidation system is rather simple and the process conditions are mild. Not contaminated ion exchange resin samples similar to those ones used in Trino NPP were processed by wet-oxidation and appropriate decomposition of the organic compounds was verified. After decomposition the residue can be solidified with cement for final disposal. When compared with direct solidification without decomposition, the number of waste packages can be significantly reduced. Additional measures for conditioning secondary waste products have also been studied, and their applicability to the Trino Nuclear Power Plant was verified. Some of conditions studied were specific to the Trino Nuclear Power Plant, but it is expected that the system will provide an effective solution for resin treatment at other Italian NPPs. (authors)

  9. Economic aspects of Dukovany NPP fuel cycle

    International Nuclear Information System (INIS)

    Vesely, P.; Borovicka, M.

    2001-01-01

    The paper discusses some aspects of high burnup program implementation at Dukovany NPP and its influence on the fuel cycle costs. Dukovany internal fuel cycle is originally designed as a three years cycle of the Out-In-In fuel reloading patterns. These reloads are not only uneconomical but they additionally increased the radiation load of the reactor pressure vessel due to high neutron leakage typical for Out-In-In loading pattern. To avoid the high neutron leakage from the core a transition to 4-year fuel cycle is started in 1987. The neutron leakage from the core is sequentially decreased by insertion of older fuel assemblies at the core periphery. Other developments in fuel cycle are: 1) increasing of enrichment in control assemblies (3.6% of U-235); 2) improvement in fuel assembly design (reduce the assembly shroud thickness from 2.1 to 1.6 mm); 3) introduction of Zr spacer grid instead of stainless steel; 4) introduction of new type of assembly with profiled enrichment with average value of 3.82%. Due to increased reactivity of the new assemblies the transition to the partial 5-year fuel cycle is required. Typical fuel loading pattern for 3, 3.5, 4 and 5-year cycles are shown in the presented paper. An evaluation of fuel cost is also discussed by using comparative analysis of different fuel cycle options. The analysis shows that introduction of the high burnup program has decrease relative fuel cycle costs

  10. NPP Krsko simulator training for operations personnel

    International Nuclear Information System (INIS)

    Pribozic, F.; Krajnc, J.

    2000-01-01

    Acquisition of a full scope replica simulator represents an important achievement for Nuclear power Plant Krsko. Operating nuclear power plant systems is definitely a set of demanding and complex tasks. The most important element in the goal of assuring capabilities for handling such tasks is efficient training of operations personnel who manipulate controls in the main control room. Use of a simulator during the training process is essential and can not be substituted by other techniques. This article gives an overview of NPP Krsko licensed personnel training historical background, current experience and plans for future training activities. Reactor operator initial training lasts approximately two and a half years. Training is divided into several phases, consisting of theoretical and practical segments, including simulator training. In the past, simulator initial training and annual simulator retraining was contracted, thus operators were trained on non-specific full scope simulators. Use of our own plant specific simulator and associated infrastructure will have a significant effect on the operations personnel training process and, in addition, will also support secondary uses, with the common goal to improve safe and reliable plant operation. A regular annual retraining program has successfully started. Use of the plant specific simulator assures consistent training and good management oversight, enhances conformity of operational practices and supports optimization of operating procedures. (author)

  11. Training needs analysis at Cernavoda NPP - Romania

    International Nuclear Information System (INIS)

    Georgescu, L.M.

    2002-01-01

    The paper is mainly on training needs analysis applied at Cernavoda NPP and will outline the Cernavoda (CNPP) approach in establishing what kind of training is necessary for CNPP employees, from the moment they are hired until they become qualified. The training methodology adapted at CNPP is one which adheres to the principles of the Systematic Approach to Training (SAT). SAT adoption at CNPP provides a broad integrated approach emphasizing not only technical knowledge and skills but also human factors knowledge, skills and attitudes. The analysis of SAT at CNPP consists of a 'table-top' analysis of training and qualification requirements. This paper will illustrate how a 'table-top' analysis by Subject Matter Experts is organized, carried out and recorded, and which categories of staff have begun this table-top analysis at CNPP. It will also give an example how this analysis is done: how the tasks of each job are rated, which are the used criteria, and how to proceed with the incorporation of the tasks into initial and continuing training, as appropriate. (author)

  12. SAT for NPP personnel training in Spain

    International Nuclear Information System (INIS)

    Gonzalez, M.

    1995-01-01

    The SAT process objectives as applied to Spanish NPPs are: Perform JTA for selected job positions at the NPPs; develop the associated training plans; develop training support media; prepare training instructors as teachers and as task analysts; develop a SAT database. A lesson-learned from the task assessments conducted at Spanish NPPs is that the final task list should be obtained with full participation of workers so that they feel the final training plan has been developed taking into account their own opinion and experience. The breakdown of the tasks into its elements and the concordant job performance measure was presented. The process of determining knowledge and skills associated with the task elements and the structure and use of the taxonomy codes (for component, system, and academic skills and knowledge) was shown and explained. Based on the Spanish experience, the average time devoted to analyze a complete task is 5.33 person-hours per task. This data has permitted training and plant management to allocate the NPP human resources to support the analysis phase of SAT (which can be very time-consuming)

  13. The safety of Ignalina NPP and ecological danger in public opinion of inhabitants of Daugavpils region

    International Nuclear Information System (INIS)

    Peipinia, O.

    1998-01-01

    Inquest of Daugavpils' region pointed to a big anxiety for ecological danger of Ignalina NPP by inhabitants and experts. Absolute majority of respondents (73-78% inhabitants and 68-82% experts) apprehend the NPP as very dangerous and dangerous. More than half of respondents apprehend the dangerous increased during last two-three years. It is because no one has a good reference about situation, because tragic al Chernobyl NPP burst was on. The anxiety increases if the respondent lives nearer of NPP. Inhabitants of Daugavpils and it's region wants the better reference about situation, about future of Ignalina NPP after 2010 year, about securities means in case of NPP burst. (author)

  14. Ukrainian Nuclear Society International Conference 'Modernization of the NPP with VVER reactor' (abstracts)

    International Nuclear Information System (INIS)

    Bar'yakhtar, V.G.

    1999-01-01

    Abstracts of the papers presented at International conference of the Ukrainian Nuclear Society 'Modernization of the NPP with VVER reactor'. The following problems are considered: improving the NPP's safety and reliability; reactor modernization, the lifetime prolongation; increasing of the reactor operating characteristics; methods of capacity factor increasing: refueling control, maintenance control; technical and economical aspects of NPP modernization; modernization of the automated control system of the fuel process at the NPP's; technical features and methods for the continued radiation and technology control at the NPP's; training, increasing the staff qualification and NPP modernization

  15. Current technological trends in development of NPP systems

    International Nuclear Information System (INIS)

    Florescu, Gheorghe; Panaitescu, Valeriu

    2010-01-01

    The recent nuclear research issues look for new technologies and continuous progress in finding different and efficient solutions for sustained and upraising energy demand. The trend of increasing energy consumption and occurring of new and large consumers, especially from Asian countries, imposes finding of new means for clean, large scale and sustained energy production. NPPs availability was continuously monitored and improved; at the same time the safety of the nuclear energy production was under surveillance. The present development of the new technologies, the discoveries of new materials and development of efficient technological processes offer the opportunities for their appropriate implementation and use in the NPP system configurations and functioning/operation. The new technologies and scientific discoveries, and also the international cooperation, offer the opportunities to mitigate the actual barriers in order to cumulate and use advanced energy production, to find new energy sources and to build improved, reliable and safe power plants. The monitoring systems, intelligent sensors and SSCs, nanotechnologies and new/intelligent materials constitute the main ways for improvement of the NPP systems configuration and processes. The paper presents: - The state of the art in the level of the currently applied technologies for nuclear power systems development; - The actual technological limits that need to be over passed for improving the NPP systems ; - The main systems that need improvement and reconfiguration for development of currently operating NPPs as well as raising the operation efficiency, availability and total safety; - The actual energy production issues; - The key arguments in sustaining the R and D new NPP systems development; - Future trends in NPP development; - The limitations in industrial processes knowledge and use. Appropriate R and D in the field of NPP systems have specific characteristics that were considered in paper completion

  16. Seismic studies and design basis ground motion for nuclear power plant sites

    International Nuclear Information System (INIS)

    1990-01-01

    The safety guide provides the approaches to be adopted and methodology to be followed in deriving the seismic design parameters for nuclear power plant (NPP) sites. It outlines the procedure to be applied for seismic studies and design basis ground motion investigations of NPP sites. It provides guidelines to assess the suitability of the NPP site against seismically induced hazards. It also considers the aspects of mitigation of hazard due to seismically generated water waves and related floodings. Seismic instrumentation to be provided at the site is also discussed. (M.G.B.). 41 refs., 2 figs., t abs

  17. A comparison of the Kozloduy NPP and Temelin NPP I and C projects

    International Nuclear Information System (INIS)

    Cook, B.M.

    2004-01-01

    Because Kozloduy NPP and Temelin NPP are both VVER 1000 plants of roughly the same vintage, they are very similar in design. However, from the viewpoint of their I and C modernization projects, there are significant differences between these plants. Some of these differences stem from the evolution of I and C technology over the relatively short period between the two projects. Other differences arise from the fact that the Kozloduy project is a phased upgrade of the I and C systems in an operating plant while the Temelin project was a 'one time' installation of the entire plant I and C system. This paper discusses these differences as well as trends in the nuclear I and C field that will shape the industry in the future. In addition to technology evolution, the comparative advantages or problems in phased upgrade versus 'one time' installations are discussed. Conclusions drawn provide insight for the planning of future I and C upgrades in VVERs and other types of nuclear power plants. (author)

  18. Observation of radioactive aerosol particle sizes in 30-km zone of the ChNPP in 1986-1987 years

    International Nuclear Information System (INIS)

    Skitovich, V.I.; Budyka, A.K.; Ogorodnikov, B.I.

    1989-01-01

    Investigation into disperse composition of radioactive aerosols was conducted in the ChNPP spaces, over ruins of 4 block, on job site and separate points of the 30-km zone by multilayer filters from ultrathin fibers. In probes taken from the job site radioactive isotopes were grouped on the particles with more than 2,5 μcm diameter. Particle sizes in the room were less than near terrestrial layer of atmosphere on job site. It is shown that the aerosol sizes containing alpha active nuclides are idential with gamma radiating isotopes of refractory elements. 4 refs., 1 fig., 2 tabs

  19. Feature extraction and sensor selection for NPP initiating event identification

    International Nuclear Information System (INIS)

    Lin, Ting-Han; Wu, Shun-Chi; Chen, Kuang-You; Chou, Hwai-Pwu

    2017-01-01

    Highlights: • A two-stage feature extraction scheme for NPP initiating event identification. • With stBP, interrelations among the sensors can be retained for identification. • With dSFS, sensors that are crucial for identification can be efficiently selected. • Efficacy of the scheme is illustrated with data from the Maanshan NPP simulator. - Abstract: Initiating event identification is essential in managing nuclear power plant (NPP) severe accidents. In this paper, a novel two-stage feature extraction scheme that incorporates the proposed sensor type-wise block projection (stBP) and deflatable sequential forward selection (dSFS) is used to elicit the discriminant information in the data obtained from various NPP sensors to facilitate event identification. With the stBP, the primal features can be extracted without eliminating the interrelations among the sensors of the same type. The extracted features are then subjected to a further dimensionality reduction by selecting the sensors that are most relevant to the events under consideration. This selection is not easy, and a combinatorial optimization technique is normally required. With the dSFS, an optimal sensor set can be found with less computational load. Moreover, its sensor deflation stage allows sensors in the preselected set to be iteratively refined to avoid being trapped into a local optimum. Results from detailed experiments containing data of 12 event categories and a total of 112 events generated with a Taiwan’s Maanshan NPP simulator are presented to illustrate the efficacy of the proposed scheme.

  20. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  1. Achievements and challenges of Paks NPP

    International Nuclear Information System (INIS)

    Bajsz, J.; Katona, T.

    2002-01-01

    As the six year long safety upgrading program at Paks NPP is approaching its final stage this year, it is a good opportunity to draw the conclusion: what have been done and how have measures influenced the safety of the plant. In its first part the paper gives an overview of the program's main issues, assesses the results from the point of view of safety, reliability and cost effectiveness as well. In the second part a survey of future tasks follows: (1) Hungary is joining to the EU. The accession process so far has not revealed any major problems concerning nuclear safety which could be seen as obstacles toward the membership. However the plant should be ready to meet the increasing level of safety regulations. Further safety upgrading measures are planned, mostly in the field of severe accident management. (2) The electricity market liberalisation in Hungary will start in 2003 and being a EU member state, the full market opening will happen within a few years. The plant has to take into account the specificity of market functioning. The most important thing is to preserve the present cost advantage of nuclear electricity generation within the market conditions. The paper presents measures performed and planned to keep the unit generation cost competitive. (3) The first unit at Paks will mark its 20't'h anniversary this year. Lifetime management issues are at the centre of the engineering activities. The work already started to prepare the lifetime extension for 20 years. The program for the license renewal, which was elaborated jointly with the nuclear regulatory body will be described.(author)

  2. Proposal of a dry storage installation in Angra NPP for spent nuclear fuel

    International Nuclear Information System (INIS)

    Romanato, Luiz S.; Rzyski, Barbara M.

    2009-01-01

    When nuclear fuel is removed from a power reactor core after the depletion of efficiency in generating energy is called Spent Nuclear Fuel (SNF). After its withdrawal from the reactor core, SNF is temporarily stored in pools usually at the same site of the reactor. During this time, short-living radioactive elements and generated heat undergo decay until levels that allow removing the SNF from the pool and sending it for reprocessing or a temporary storage whether any of its final destinations has not yet been defined. It can be loaded in casks and disposed during years in a dry storage installations until be sent to a reprocessing plant or deep repositories. Before any decision, reprocessing or disposal, the SNF needs to be safely and efficiently isolated in one of many types of storages that exist around the world. Worldwide, the amount of SNF increases annually and in the next years this amount will be higher as a consequence of new Nuclear Power Plants (NPP) construction. In Brazil, that is about to construct the Angra 3 nuclear power reactor, a project about the final destination of the SNF is not yet ready. This paper presents a proposal for a dry storage installation in the Angra NPP site since it can be an initial solution for the Brazilian's SNF, until a final decision is taken. (author)

  3. NPP Tropical Forest: San Eusebio, Venezuela, 1973-1974, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set contains three ASCII data files (.txt format), one for net primary production (NPP) component data and two for climate data. The NPP studies were...

  4. NPP Tropical Forest: John Crow Ridge, Jamaica, 1974-1978, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set contains five NPP data files and three climate data files (ASCII .txt format). There is one NPP file for each of the five sub-types of upper montane...

  5. Comprehensive radiation survey and public health assessment in the vicinity of NPP

    Directory of Open Access Journals (Sweden)

    Samoilov A.S.

    2015-12-01

    health indicators of the public living around the NPP, general state of the adult and children public is healthy. There is no impact of the NPP on negative trends in some changing indicators of the adult and children public health.

  6. NPP Tropical Forest: Magdalena Valley, Colombia, 1970-1971, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set contains two NPP data files and one climate data file (ASCI .txt format). The NPP files contain data for above-ground biomass, litterfall, and nutrient...

  7. Applying a small NPP in the Argentine mining industry

    International Nuclear Information System (INIS)

    Barrientos, C.J.; Masriera, N.A.

    1998-01-01

    The CAREM 25 reactor project is a small PWR nuclear power plant of 27 MWe, based on advanced concepts: a self-pressurized integral primary with natural convection of the coolant and a more simple and reliable general design. The CAREM concept has many advantages as a power generator in small electrical grids. Besides, there are some non-electrical applications under consideration, since a co-generation scheme seems very interesting from the economical point of view. In this category two alternatives have been considered: a standard desalination facility and a process plant in the mining industry. In this paper, a conceptual analysis of the second alternative is presented. Mining is a branch of the domestic industry that has shown a remarkable growth in the past three years mainly due to a steady inflow of foreign investments (about two billion dollars for that period). And one of the most attractive markets is in the extraction and manufacturing of non-ferrous minerals, coming from deposits in the northwest of Argentina: sodium sulfate, lithium salts, and boron compounds. Nevertheless it faces an unsolved problem in the energy high prices due to the fact that the production sites are located in remote areas where the only achievable energy source is the transportation of fuel oil. In this scenario, a small NPP may be a competitive source of process heat and electricity, with enough autonomy to uncouple fuel requirements from production strategies. The present study analyses the possible application of the CAREM concept in the non-ferrous mining industry of the Northwest of Argentina, considering a co-generation scheme. The main results of this analysis and the inherent advantages of the approach, show that the alternative may be feasible both from the technical and the economical points of view. (author)

  8. Local information at Tihange N.P.P

    International Nuclear Information System (INIS)

    Rosseel, R.

    1989-01-01

    In our democratic countries, fair acceptance by the public of the various stages in the implementation of a nuclear programme is a condition sine qua non for its success. In this respect, the public opinion of the local community always plays a major role and could become crucial in particular circumstances when, for instance, a new site is created or an accident occurs. Therefore, local information should be given priority and be perceived as a key factor in any communication strategy. However, mere information is not enough. Information is like grain it can only germinate in a well prepared soil. In other words, the fair and positive perception of any information or message relies not only on its quality but equally on the credibility of the source (utility, nuclear lobby, etc... and the reservoir of goodwill It has been able to create within society. The purpose of this paper is to relate the successful actions observed at Tihange N.P.P. This plant is located near the town of Huy along the river Meuse in Southern Belgium. Its total capacity amounts to 2,790 MW. The three PWR were commissioned respectively in 1975, 1983 and 1985. There is good evidence to believe that the Tihange nuclear power plant is presently well integrated in its socioeconomic environment. The plant's management lives in a climate of positive 'peaceful coexistence' with the local authorities, the last demonstration against the plant dates back to some 10 years ago and very little criticism, if any, is heard from the local community. Possibly the most convincing evidence of this relaxed atmosphere is that none of the candidates put forward by environmentalist parties were elected in the latest general and municipal elections at Huy. Dual policy aimed to promoting congenial neighbourly behaviour and giving priority to local information has undoubtedly significantly contributed to this result

  9. Validation of MCNP NPP Activation Simulations for Decommissioning Studies by Analysis of NPP Neutron Activation Foil Measurement Campaigns

    Directory of Open Access Journals (Sweden)

    Volmert Ben

    2016-01-01

    Full Text Available In this paper, an overview of the Swiss Nuclear Power Plant (NPP activation methodology is presented and the work towards its validation by in-situ NPP foil irradiation campaigns is outlined. Nuclear Research and consultancy Group (NRG in The Netherlands has been given the task of performing the corresponding neutron metrology. For this purpose, small Aluminium boxes containing a set of circular-shaped neutron activation foils have been prepared. After being irradiated for one complete reactor cycle, the sets have been successfully retrieved, followed by gamma-spectrometric measurements of the individual foils at NRG. Along with the individual activities of the foils, the reaction rates and thermal, intermediate and fast neutron fluence rates at the foil locations have been determined. These determinations include appropriate corrections for gamma self-absorption and neutron self-shielding as well as corresponding measurement uncertainties. The comparison of the NPP Monte Carlo calculations with the results of the foil measurements is done by using an individual generic MCNP model functioning as an interface and allowing the simulation of individual foil activation by predetermined neutron spectra. To summarize, the comparison between calculation and measurement serve as a sound validation of the Swiss NPP activation methodology by demonstrating a satisfying agreement between measurement and calculation. Finally, the validation offers a chance for further improvements of the existing NPP models by ensuing calibration and/or modelling optimizations for key components and structures.

  10. Main principles of the Chernobyl' NPP zone development

    International Nuclear Information System (INIS)

    Ignatenko, E.I.; Komarov, V.I.; Zverkov, V.V.; Proskuryakov, A.G.

    1989-01-01

    It is suggested to divide the Chernobyl' NPP zone into two parts, which are the alienation and evacuation (buffer) zones. The alienation zone includes the areas with greatest contamination around the Chernobyl' NPP. The population residence in this zone is forbidden. The watching method of working with short-time personnel residence is suggested to be used in this zone. The buffer zone is the territory out of the alienation zone boundaries including all settlements, from which the population is evacuated. Constant residence is permitted in the buffer zone for persons 50 and more years old with introduction of restrictions for diet and residence organization. The production activity in this zone includes operation of three units of the Chernobyl' NPP, works with the Ukrytie object and researches. Operations connected with radioactive waste processing and redisposal from places of storage is not recommended to be done. It is suggested to develop methods for local radioactive waste processing

  11. Core design methodology and software for Temelin NPP

    International Nuclear Information System (INIS)

    Havluj, F; Hejzlar, J.; Klouzal, J.; Stary, V.; Vocka, R.

    2011-01-01

    In the frame of the process of fuel vendor change at Temelin NPP in the Czech Republic, where, starting since 2010, TVEL TVSA-T fuel is loaded instead of Westinghouse VVANTAGE-6 fuel, new methodologies for core design and core reload safety evaluation have been developed. These documents are based on the methodologies delivered by TVEL within the fuel contract, and they were further adapted according to Temelin NPP operational needs and according to the current practice at NPP. Along with the methodology development the 3D core analysis code ANDREA, licensed for core reload safety evaluation in 2010, have been upgraded in order to optimize the safety evaluation process. New sequences of calculations were implemented in order to simplify the evaluation of different limiting parameters and output visualization tools were developed to make the verification process user friendly. Interfaces to the fuel performance code TRANSURANUS and sub-channel analysis code SUBCAL were developed as well. (authors)

  12. Computer Security of NPP Instrumentation and Control Systems: Cyber Threats

    International Nuclear Information System (INIS)

    Klevtsov, A.L.; Trubchaninov, S.A.

    2015-01-01

    The paper is devoted to cyber threats, as one of the aspects in computer security of instrumentation and control systems for nuclear power plants (NPP). The basic concepts, terms and definitions are shortly addressed. The paper presents a detailed analysis of potential cyber threats during the design and operation of NPP instrumentation and control systems. Eleven major types of threats are considered, including: the malicious software and hardware Trojans (in particular, in commercial-off-the-shelf software and hardware), computer attacks through data networks and intrusion of malicious software from an external storage media and portable devices. Particular attention is paid to the potential use of lower safety class software as a way of harmful effects (including the intrusion of malicious fragments of code) on higher safety class software. The examples of actual incidents at various nuclear facilities caused by intentional cyber attacks or unintentional computer errors during the operation of software of systems important to NPP safety.

  13. The local impacts of Borssele NPP closing down

    International Nuclear Information System (INIS)

    Mandos, J.L.

    2000-01-01

    The municipal council of Borsele considers that the use of nuclear energy is a question of national policy, but considers itself responsible for town and country planning, safety and employment. The two latter aspects are especially significant if plans for shutdown are concerned. Confidence in safety of the NPP in Borsele has increased in recent years due to transparent information policy of the power plant itself as well as the local government and most of the employees living in the area. If considering the circumstances under which the decision about the closure of NPP one could sees this is a purely political decision. The local government will continue the close cooperation with the National government and the Parliament in solving the problem of employment and social impact of NPP shutdown

  14. Role and contribution of AREVA NP GmbH and Siemens for completion of Belene NPP

    International Nuclear Information System (INIS)

    Wirries, A.

    2009-01-01

    The content of the presentation includes: 1.Experience of AREVA NP / Siemens - participation in modernization and new building of NPP with VVER-1000: modernization of NPP Kozloduy Units 5 and 6 and contribution for NPP Tianwan Units 1 and 2; 2. AREVA NP / Siemens Contribution for Belene NPP: electrical systems; safety I and C; operational I and C; Heating-Ventilation-Air conditioning (HVAC); Hydrogen recombination; 3. Joint commitment for Belene

  15. Planning and management support for NPP personnel SAT-based training programmes

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    This paper deals with planning and management support for NPP personnel SAT based training programmes based on IAEA TC Project SLR/0/003 on upgrading NPP personnel training, with the aim of upgrading NPP safety and reliability of NPP operation and maintenance. The costs needed include both Slovak and IAEA sources. Five stages of the Project are defined: planning; organizing; motivating; implementation; control, review and accountability

  16. Engineering safety review mission Krsko NPP external events PSA. Ljubljana, Slovenia 19-23 February 1996. Final report

    International Nuclear Information System (INIS)

    Budnitz, R.J.; Smith, P.

    1996-01-01

    Within the scope of the TC Project RER/9/035, a review mission visited Ljubljana, Slovenia, 19-23 February 1996. Two outside experts, Messrs. R.J. Budnitz (USA) and Paul Smith (USA), as well as a staff member, A. Guerpinar (ESS-NSNI) took part in the review. The purpose of the mission was to assist the Slovenian Nuclear Safety Administration to review the external events PSA prepared by Krsko NPP consultants Westinghouse Energy Systems Europe and EQE International. Another seismic safety review was performed concurrently in Ljubljana involving the investigations in relation to the tectonic stability and reassessment of the design basis ground motion characterization for the Krsko NPP site

  17. Making the Most of the Operating Experience Feedback: Design of a Computerized Data Base Related to NPP Component Behavior

    International Nuclear Information System (INIS)

    Degrave, C.; Martin-Onraet, M.

    1998-01-01

    Electricite de France carries out several analyses on NPP component behavior every year. However, these analyses are conducted separately by specialists of only the kind of component and regardless of the time factor. Seven years ago, a working group from the Nuclear Operation Division completed a detailed examination of component behavior of the 50 NPP then in operation, over a ten-years period (from 1980 to 1990). These analyses have been centered on main components only. Today, another working group will integrate this operating experience in a computerized process to facilitate access to all the information contained in the data base. This system will be based on a site server allowing a user-friendly connection, and updated periodically. (author)

  18. Study and optimization of operating regimes of NPP district heating system

    International Nuclear Information System (INIS)

    Bunin, V.S.; Vasil'ev, M.K.; Kudryavtsev, A.A.; Gorbashev, Yu.B.; Gadzhij, V.M.

    1980-01-01

    Thermal tests of the system with two reactors and four turbines have been carried out for the purpose of verification of operating regimes of the NPP district heating system with boiling single-curcuit RBMK-1000 reactors and K-500-65/3000 turbines. The system is designed for heat supply of habitable settlement and industrial site. The data processing have been carried out by the BESM-6 computer representing distributions of heat flow, steam, water and their parameters and determining the main energy indices of the system. Calculations of the system operating regime variables during the year have been carried out with the help of this program. It has been expected that the system provided heat consumption of 232 MW at calculated regime of thermal loading of the district, temperature regime of the system water of 130/170 deg C, relative load of hot water supply of 0.2 and duration of heating period of 4800 h. Calculations demonstrated that distric heat supply by NPP allowed one to supplant about 85 thous. of reference fuel/year of organic fuel. About 63 thous. of reference fuel/year are required for compensation of decrease of electric energy production in a condensation cycle. It has been also shown, that replacing the four-stroke system heaters by one-stroke heaters permits to drop system water underheating 1.5 times and, respectively, electric energy underproduction to 72 mln Mj (20 mln, kWxh). It produces additional economy of 6.6 thous. reference fuel/year. Calculations of its heat system have been conducted in order to determine the influence of water consumption in an intermediate circuit on the system efficiency. It has been shown that with the increase of water consumption energy power losses decrease. Thus, the above studied have demonstrated that the use of the single-circuit NPP district heating systems leads to considerable economy of fuel

  19. Study on the risk-informed regulation of NPP

    International Nuclear Information System (INIS)

    Wang Chaogui

    2007-01-01

    The risk-informed regulation is a modern type of NPP safety management mode using both deterministic and probabilistic approaches. It is necessary to entirely and systematically study the associated regulations, standards and practices in order to promote the developments of risk-informed regulations in China. This paper introduces the risk-informed regulation, gives out the basic principles, method and acceptance risk criteria of risk-informed decision,making, discusses the PSA requirements for risk-informed decision-making and makes some suggestions about the application of risk-informed regulations in Chinese NPP. (authors)

  20. Structure study and design of Qinshan NPP PCCV

    International Nuclear Information System (INIS)

    Xia Zufeng; Xu Yongzhi; Wang Tianzhen; Wu Jibiao

    1993-02-01

    The design process of Qinshan NPP (nuclear power plant) PCCV (prestressed concrete containment vessel) is summarized. The tendon test, structural description, design bases and analysis method are introduced. The arrangement for preventing concrete from cracking and design features of post-tensioning system and steel liner are presented. The results of model test and non-linear analysis for ultimate load in Qinshan NPP PCCV are also given. Through the integrity test of PCCV, it shows that the test values are in agreement with predicted values, the structure is excellent and the performance of leak tightness conforms to the safety requirements

  1. Regulation principles for NPP radionuclide releases into atmosphere

    International Nuclear Information System (INIS)

    Teverovskij, E.N.; Artemova, N.E.; Bondarev, A.A.

    1983-01-01

    The present day views on the permissible levels of atmosphere contamination by NPP radioactive releases are observed. Methods for determination of the NPP effluents permissible concentrations are described for all their possible paths to people irradiation within time intervals. Calculation techniques for maximum permissible releases (MPR) are considered for different type atmosphere contamination sources as well as those sources classification. Accounting for the atmosphere background contamination is also described in connection with MPR determination. A system of regulation criteria and measures has been realized with the objective of the atmosphere protection against contamination [ru

  2. The EC TACIS project 'Social impact of closing Chornobyl NPP' objectives, tasks and intended outcomes

    International Nuclear Information System (INIS)

    Schoen, A.

    2001-01-01

    Being part of the common activities of Slavutich and ChNPP, our EC TACIS project representatives already actively participated in the elaboration of the state programme aimed to ensure the social security of the ChNPP personnel and the population of Slavutich in the result of the final shut down of ChNPP

  3. Variations and trends of terrestrial NPP and its relation to climate ...

    Indian Academy of Sciences (India)

    This means terrestrial ecosystem NPP is more closely related to near surface temperature than precipitation. Between 1976 and 2005, NPP shows an obvious increasing temporal trend, indicat- ing the terrestrial ecosystem has had a positive response to climate change. MME NPP has increased. 3.647PgC during historical ...

  4. NPOESS Preparatory Project (NPP) Environmental Products

    Science.gov (United States)

    Grant, K. D.; Smith, D. C.

    2011-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will contribute the afternoon orbit component and ground processing system of the restructured National Polar-orbiting Operational Environmental Satellite System (NPOESS). As such, the Joint Polar Satellite System replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the ground processing component of both POES and the Defense Meteorological Satellite Program (DMSP) replacement, known as the Defense Weather Satellite System (DWSS), managed by the Department of Defense (DoD). The Joint Polar Satellite System satellite will carry a suite of sensors designed to collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The ground processing system for the Joint Polar Satellite System is known as the Common Ground System (JPSS CGS), and consists of a Command, Control, and Communications Segment (C3S) and the Interface Data Processing Segment (IDPS). Both are developed by Raytheon Intelligence and Information Systems (IIS). The Interface Data Processing Segment will process Joint Polar Satellite System and Defense Weather Satellite System satellite data to provide environmental data products (aka, Environmental Data Records or EDRs) to the National Oceanic and Atmospheric Administration and Department of Defense processing centers operated by the United States government. The Interface Data Processing Segment will process Environmental Data Records beginning with the NPOESS Preparatory Project (NPP) and continue through the lifetime of the Joint Polar Satellite System and Defense Weather Satellite System programs. Under the National Polar-orbiting Operational Environmental

  5. Decommissioning of NPP A1 - HWGCR type

    International Nuclear Information System (INIS)

    Burclova, J.

    1998-01-01

    Prototype nuclear power plant A-1 located at Jaslovske Bohunice, was a HWGCR with channel type reactor KS 150 (refuelling during operation) and capacity of 143 MWe. Single unit has been constructed with reactor hall building containing reactor vessel, heavy water system and equipment for spent fuel handling. Another compartment of main building contents coolant system piping, six steam generators and six turbo compressors, the turbine hall was equipped by three turbines. Unit also shares liquid radwaste treatment and storage buildings and ventilation systems including chimney. It started operation in 1972 and was shutdown in 1977 after primary coolant system integrity accident. In 1979 a final decision was made to decommission this plant. The absence of waste treatment technologies and repository and not sufficient storage capacity affected the planning and realization of decommissioning for NPP A-1. The decommissioning policy for the first stage is for lack of regulations based on 'case by case' strategy. For these reasons and for not existence of Decommissioning Found until 1995 the preferred decommissioning option is based on differed decommissioning with safe enclosure of confinement. Transfer of undamaged spent fuel cooled in organic coolant to Russia was finished in 1990. It was necessary to develop new technology for the damaged fuel preparation for transport. The barriers check-up and dismantling of secondary circuit and cooling towers was performed during 1989/90. The complex plan for the first phase of A-1 decommissioning - the status with treated operational radwaste, removed contamination and restored treated waste and spent fuel (in case of interruption of transfer to Russia) was developed in 1993-1994. Under this project bituminization of all liquid operational radwaste (concentrates) was performed during 1995/96, vitrification of inorganic spent fuel coolant started at 1996, decontamination of spent fuel pool coolant occurs (under AEA Technology

  6. The case of NPP Greifswald, promises and realities as seen from a regional point of view

    International Nuclear Information System (INIS)

    Lietz, M.

    2000-01-01

    We hope that after the closing down of the NPP our site development program will be successful in restructuring the industrial site, enable economic growth and create new jobs. However, the experience of our commune showed that the whole region can be lead into an economic and social disaster, if decisions of the government are taken without involving local authorities. We also think that decisions to shut down NPPs have to be combined with a package of a restructuring program and a special budget for investments in the local and regional infrastructure. The communes might then have a chance to locate new promising industries, avoid losses of high-tech jobs and well educated employees. Otherwise, a serious break down of traditional social structures would be likely to occur, especially in areas without alternative industries. (author)

  7. Compensations to Local Communities in the Krsko NPP Decommissioning Program

    International Nuclear Information System (INIS)

    Levanat, I.; Knapp, A.; Lokner, V.

    2010-01-01

    In Slovenia, direct financial compensations (for 'limited land use') to local communities hosting nuclear facilities were initially specified by a government Decree from 2003. In Croatia, a possibility of direct financial compensations had been indicated in the land use plan in conjunction with the prospective RW repository siting about a decade earlier, but the topic was subsequently abandoned together with the repository project. In 2004, the joint Slovenian-Croatian Decommissioning and LILW and SF management program for NPP Krsko from 2004 (the 1st revision of the joint Program) conservatively included the compensation amounts from the Slovenian Decree into the cost estimates of LILW and SF repositories, although their location was entirely unspecified ('in Slovenia or in Croatia'). Shortly before the 2nd revision of the joint Program started in the fall of 2008, the Slovenian government had amended its Decree, practically doubling the amounts of the repository compensations. Assuming that some (or possibly all) nuclear facilities and waste, dealt with in the Program, may be located in Slovenia, the revision has adopted a conservative approach to include all compensations to local communities that may be required by the Slovenian regulations into the Program costs. This paper discusses the Slovenian government Decree, its impact on the joint Program costs, and its implications on RW and SF management in the region. The Decree suffers from the lack of self-consistency, clarity, and consistency with the more general legal provisions on which it should have been based, but it may have an important supporting role in the process of RW and SF management facilities siting. The Decree introduced significant additional costs into the joint Program, which have grown from about one hundred million eur in the 1st revision to about half a billion in this revision (depending on the Program scenario). Besides, application of the Decree in the joint Program has set a precedent

  8. Cuba: Juragua NPP. Upgrades. Modifications and improvements. Annex 5A

    International Nuclear Information System (INIS)

    Gonzales Aguilera, H.

    1999-01-01

    This annex deals with upgrades - modifications and improvements. Planning for resumption of work at Juragua NPP is under way, and a strategic plan of upgrades and modifications has been prepared. The proposed improvements were categorized, reviewed by the regulatory body and generally approved. This annex outlines the format of the plan. (author)

  9. Welding of large-size embelled fittings in NPP construction

    International Nuclear Information System (INIS)

    Semenov, N.A.; Savinov, O.A.

    1988-01-01

    Drawbacks of the accepted technology for peoducing embedded fittings are considered. Activities on modernization of the standard ADF-2001 automatic welding machine are described. Results of testing the samples of welded joints performed using the modernized automatic welding machine, and economic effect caused by its introduction at the balakovo NPP second unit construction are presented

  10. Improvement of waste release control in French NPP

    Energy Technology Data Exchange (ETDEWEB)

    Samson, T.; Lucquin, E.; Dupin, M. [EDF/GDL (France); Florence, D. [EDF/GENV (France); Grisot, M. [EDF/CNPE Saint Laurent (France)

    2002-07-01

    The new waste release control in French NPP is more restrictive than the old one and needs heavy investment to bring plants to compliance with it. The great evolutions are a chemical follow up on more chemicals with a higher measurement frequency and with lower maximum concentrations and a specific measurement of carbon 14. Regarding radioactive releases, a new counting has been settled and activity of carbon 14 release is now measured and no longer calculated. The evolution of the French regulation leads to develop specific procedures and analytical techniques in chemistry and in radiochemistry (UV spectrometric methods, carbon 14 measurements,..) EDF NPP operators have launched a voluntarist process to reduce their releases since the beginning and before the evolution of the regulation. EDF priorities in terms of environment care lead henceforth to implement a global optimisation of the impact for a better control of releases. The new regulation will help EDF to reach its goals because it covers all the aspects in one administrative document: it is seen as a real simplification and a clarification towards public. In addition, this new regulation fits in with international practices which will allow an easier comparison of results between EDF and foreign NPP. These big environmental concerns lead EDF to create a national dedicated laboratory (LAMEN) in charge of developing specific measurement procedures to be implemented either by NPP or by sub-contractor laboratories. (authors)

  11. NPP safety and personnel training. XII International conference. Abstracts

    International Nuclear Information System (INIS)

    2011-01-01

    The 12th International conference NPP Safety and Personnel Training took place in Obninsk, October 4-7, 2011. The issues of nuclear technologies safety are considered.The problems of life-cycle management of nuclear facilities are discussed. The criteria of assessment of physical protection systems of nuclear facilities are presented [ru

  12. Device to measure level in a steam drum of NPP

    International Nuclear Information System (INIS)

    Vinogradov, Yu.A.

    1988-01-01

    Gravitation-hydrostatic device for measuring coolant level in a steam drum of NPP is described. The device enables to improve the accuracy and sensitivity of measuring coolant level above and below the submerged perforated sheet of the steam drum and decrease the amount of levelling vessels in the unit by 50%. 1 fig

  13. Analysis of flooding possibilities of premises of Ignalina NPP

    International Nuclear Information System (INIS)

    1999-01-01

    Analysis of flooding possibilities of premises with safety related equipment of Ignalina NPP was performed. In calculations codes SQUIRT and RELAP5 was used. In most cases it was found that it would be enough time to take corrective measure in the case of flooding accident

  14. Regulatory review of NPP Krsko Periodic Safety Review

    International Nuclear Information System (INIS)

    Lovincic, D.; Muehleisen, A.; Persic, A.

    2004-01-01

    At the request of the Slovenian Nuclear Safety Administration (SNSA), Krsko NPP prepared a Periodic Safety Review (PSR) program in January 2001. This is the first PSR of NPP Krsko, the only nuclear power plant in Slovenia. The program was reviewed by the IAEA mission in May 2001 and approved by SNSA in July 2001. The program is made in accordance with the IAEA Safety Guide 'Periodic Safety Review of Operational Nuclear Power Plants' No. 50-SG-012 and with European practice. It contains a systematic review of operation of the NPP Krsko, including the review of the changes as a result of the modernization of the facility. The main tasks of PSR are review of plant status for each safety factor, development of aging and life cycle management program, review of seismic design and PSHA analysis and update of regulatory compliance program. The prioritization process of findings and action plan are also important tasks of PSR. The basic safety factors of the PSR review are: Operational Experience, Safety Assessment and Analyses, Equipment Qualification and Ageing Management, Safety Culture, Emergency Planing, Environmental Impact and Radioactive Waste, Compliance with license requirements and Prioritization. It had been agreed that SNSA will have reviewed all PSR reports generated during the PSR process. At the end of 2003 the PSR Summary Report with selected recommendations for action plan was completed and delivered to SNSA for review. The paper presents regulatory review of NPP Krsko PSR with emphasis on the evaluation of the PSR issues ranking process. (author)

  15. Mastering the design technology of NPP component fabrication

    International Nuclear Information System (INIS)

    Popov, L.I.

    1986-01-01

    The problems of mastering and improvement of the technology of NPP component fabrication are discussed. Main methods for improvement of storing, thermal, welding, mechano-assemblying and instrumental productions as well as means of mechanization and automation of the production and methods for quality control are considered

  16. Disposal of spent nuclear fuel from NPP Krsko

    International Nuclear Information System (INIS)

    Mele, I.

    2004-01-01

    In order to get a clear view of the future liabilities of Slovenia and Croatia regarding the long term management of radioactive waste and spent nuclear fuel produced by the NPP Krsko, an estimation of disposal cost for low and intermediate level waste (LILW) as well as for spent nuclear fuel is needed. This cost estimation represents the basis for defining the target value for the financial resources to be accrued by the two national decommissioning and waste disposal funds, as determined in the agreement between Slovenia and Croatia on the ownership and exploitation of the NPP Krsko from March 2003, and for specifying their financial strategies. The one and only record of the NPP Krsko spent fuel disposal costs was made in the NPP Krsko Decommissioning Plan from 1996 [1]. As a result of incomplete input data, the above SF disposal cost estimate does not incorporate all cost elements. A new cost estimation was required in the process of preparation of the Joint Decommissioning and Waste Management Programme according to the provisions of the above mentioned agreement between Slovenia and Croatia. The basic presumptions and reference scenario for the disposal of spent nuclear fuel on which the cost estimation is based, as well as the applied methodology and results of cost estimation, are presented in this paper. Alternatives to the reference scenario and open questions which need to be resolved before the relevant final decision is taken, are also briefly discussed. (author)

  17. Ecological radiation monotoring in NPP region, aims and tasks

    International Nuclear Information System (INIS)

    Egorov, Yu.A.

    1986-01-01

    Aims and tasks of ecological radiation monitoring in the NPP region are discussed. The aims of monitoring are: to determine possible sequences of NPP radioactive release effects on ecosystems, taking place on the background of chemical and thermal pollution to develop standard of radiation effect on ecosystems; the aims includes also obtaining of information for forecasting and evaluating long-term radiation effects, establishment of factors characterizing the ecosystem state, establishment of a combined effect of radioactive wastes with chemical and thermal ones. Finally, the aim of monitoring consists in providing the natural object conservation in the NPP region under optimal operation conditions. Thus it is necessary to solve the following problems: to observe systematically release, transport and transformation, when transporting radioactive and chemical contaminants in terrestial and aquatic biocenoses, as well as injection and transport in them of waste heat; to observe systematically the natural physico-chemical, chemico-biological processes affecting the injection and transport of contaminants in ecosystem components; to observe systematically the natural and, probably, antropogenic processes; to carry out systematically observations of the ecosystem state in the NPP region and eco-systems-monitors

  18. Some problems connected with the Chernobyl NPP Unit 4 Accident

    International Nuclear Information System (INIS)

    Bar'yakhtar, V.G.

    1994-01-01

    The description of the eruption of radionuclides caused by the Chernobyl NPP Unit 4 Accident, including the effective time of the accident, quality and quantity of radio waste, is presented. A particular attention is given to the spotty structure of Chernobyl's contamination. The assumption that the spots distribution may be a consequence of the turbulent processes in the atmosphere is made

  19. Evaluation of MODIS NPP and GPP products across multiple biomes.

    Science.gov (United States)

    David P. Turner; William D. Ritts; Warren B. Cohen; Stith T. Gower; Steve W. Running; Maosheng Zhao; Marcos H. Costa; Al A. Kirschbaum; Jay M. Ham; Scott R. Saleska; Douglas E. Ahl

    2006-01-01

    Estimates of daily gross primary production (GPP) and annual net primary production (NPP) at the 1 km spatial resolution are now produced operationally for the global terrestrial surface using imagery from the MODIS (Moderate Resolution Imaging Spectroradiometer) sensor. Ecosystem-level measurements of GPP at eddy covariance flux towers and plot-level measurements of...

  20. Decommissioning of the NPP A-1 heavy water management system

    International Nuclear Information System (INIS)

    Medved, J.; Rezbarik, J.; Vargovcik, L.; Vykukel, I.

    2015-01-01

    The paper deals with experience and techniques in the application of decontamination technology and remotely controlled robotic devices for the decontamination and dismantling of the heavy water management system during undergoing decommissioning process of the A-1 NPP as well as treatment of arising liquid waste All of these activities are characterized by high level of radioactivity and contamination. (authors)

  1. In-core fuel management for Cofrentes NPP

    International Nuclear Information System (INIS)

    Marco, M.

    1990-01-01

    Hidroelectrica Espanola has established an in-house nuclear analysis capability in Hidrola's Servicio de Ingenieria y Analisis Nucleares (SIAN). This article describes SIAN, its origins, resources, codes, and its work related to the company's 100%-owned Cofrentes NPP. 1 fig., 2 tabs

  2. Radiological Shielding Analysis of Special Building for the Old NPP Krsko Steam Generators

    International Nuclear Information System (INIS)

    Bace, M.; Jecmenica, R.; Smuc, T.

    2000-01-01

    One of the NPP Krsko modernization projects is steam generator replacement, during which old steam generators have to be removed and stored on a safe location. Since old steam generators are radioactive a new, special building have to be designed and constructed at NPP Krsko site to house the old steam generators, as well as for the storage of non-compactable waste which will be produced during the replacement activities. It is the aim of this paper to estimate the dimensions of the outer walls and of the roof slab for the special building which will satisfy the radiological constraints for the unrestricted areas. Computer code ORIGEN2-PC has been used for activity estimation, while analytical expressions, QAD-CGGP and MCNP code have been used for the radiological shielding analysis. Our results indicate that 70 cm of the concrete for the wall and 60 cm for the roof provide satisfactory shield which limits the dose rates below American standards for level of radiation in unrestricted areas. (author)

  3. Self-reliance and innovation of Qinshan phase II NPP project

    International Nuclear Information System (INIS)

    Ye Qizhen; Yang Lanhe

    2007-01-01

    This article mainly describes the self-reliance and innovation of Qinshan nuclear power project of phase II, in-between it contains new reactor core design, as well as related experimental and calculation analysis, especially for new reactor design produced fluid-induced vibration model test, theoretical analysis and testing in-built reactor; aiming at two-loop NSSS a series improvement made for safety systems and related safety analysis to enhance their reliability and redundancy; according to specialty of two-loop NSSS an optimization made for NPP parameters and design of related equipments, for the purpose to make the output of NPP maximal; design of main reactor building and T-G building also improved according to characteristics of two-loop NSSS and site conditions. CRDM and refueling machine are researched and manufactured on base of self-reliance, their performance are better than design requirements, large portion of key equipments are localized through different way. In construction first time realized the integrated erection of containment dome. During the commissioning non-nuclear steam driving of T-G set, as well as 500 kV high voltage rising using emergent diesel generator, etc. are carried out.In period of operation still continuous innovation and improvement are made, so that to keep the good record of operation. (authors)

  4. Conceptual Design of Hybrid Safety Features for NPP by Utilizing Solar Updraft Tower

    Energy Technology Data Exchange (ETDEWEB)

    Song, Sub Lee [Handong Global University, Pohang (Korea, Republic of); Choi, Young Jae; Kim, Yong Jin [KAIST, Daejeon (Korea, Republic of); Park, Hyo Chan; Park, Youn Won [BEES, Daejeon (Korea, Republic of)

    2016-05-15

    In this study, hybrid safety features for NPP with solar updraft tower (SUT) is conceptually suggested to cope with loss of ultimate heat sink accident. The hybrid safety features utilizing SUT target NPPs in seashore of Arabian Gulf. Usually NPPs are constructed near seashore to utilize sea water as an ultimate heat sink. Residual heat or decay heat of nuclear reactor will diffuse into the ocean through the condenser. NPPs in Middle East are expected to be placed in seashore of Arabian Gulf. The NPP site of Barakah is an actual example. For NPPs in seashore of Arabian Gulf, an additional safety concern should be considered. Arabian Gulf is the largest oil transporting route in the world. The oil spill risk in Arabian Gulf will be the largest simultaneously. Unfortunately, not like other oceans, Arabian Gulf is a kind of closed ocean which does not have strong ocean currents connected to out of the gulf. If once oil spill is occurred, its influence can be propagated more than our expectation. The spilled oil also can affect to NPPs in seashore by covering surfaces of condenser. It will directly cause loss of ultimate heat sink. The hybrid safety features of SUT system are expected to aid normal operation of safety system and mitigate consequence of severe accident. Detail analysis and technology development is ongoing now.

  5. Development of a dose assessment computer code for the NPP severe accident

    International Nuclear Information System (INIS)

    Cheong, Jae Hak

    1993-02-01

    A real-time emergency dose assessment computer code called KEDA (KAIST NPP Emergency Dose Assessment) has been developed for the NPP severe accident. A new mathematical model which can calculate cloud shine has been developed and implemented in the code. KEDA considers the specific Korean situations(complex topography, orientals' thyroid metabolism, continuous washout, etc.), and provides functions of dose-monitoring and automatic decision-making. To verify the code results, KEDA has been compared with an NRC officially certified code, RASCAL, for eight hypertical accident scenarios. Through the comparison, KEDA has been proved to provide reasonable results. Qualitative sensitivity analysis also the been performed for potentially important six input parameters, and the trends of the dose v.s. down-wind distance curve have been analyzed comparing with the physical phenomena occurred in the real atmosphere. The source term and meteorological conditions are turned out to be the most important input parameters. KEDA also has been applied to simulate Kori site and a hyperthetical accident with semi-real meteorological data has been simulated and analyzed

  6. Site-level evaluation of satellite-based global terrestrial gross primary production and net primary production monitoring.

    Science.gov (United States)

    David P. Turner; William D. Ritts; Warren B. Cohen; Thomas K. Maeirsperger; Stith T. Gower; Al A. Kirschbaum; Steve W. Runnings; Maosheng Zhaos; Steven C. Wofsy; Allison L. Dunn; Beverly E. Law; John L. Campbell; Walter C. Oechel; Hyo Jung Kwon; Tilden P. Meyers; Eric E. Small; Shirley A. Kurc; John A. Gamon

    2005-01-01

    Operational monitoring of global terrestrial gross primary production (GPP) and net primary production (NPP) is now underway using imagery from the satellite-borne Moderate Resolution Imaging Spectroradiometer (MODIS) sensor. Evaluation of MODIS GPP and NPP products will require site-level studies across a range of biomes, with close attention to numerous scaling...

  7. Plant level of automated control system at a NPP with RBMK reactor

    International Nuclear Information System (INIS)

    Vorob'ev, V.P.; Gorbunov, V.P.; Dmitriev, V.M.; Litvin, A.S.

    1987-01-01

    The functional structure of plant level automated control system (ACS) at NPP with RBMK-1000 reactors, its binding with the on-line control system of higher and lower levels, as well as engineering requirements to software and recommendations on composition of hardware components, are considered. NPP ACS is an organizational-engineering system consisting of computer facilities and binding aimed at solving management, economical, organizational and physical-engineering problems to control NPP more effectively. The system carries out data acquisition, preliminary processing, analysis, transmission and representation for users to accept solutions for NPP operation by operative and management personnel. The main aim of integrated NPP ACS is the control development and increase of NPP economical efficiency, the increase of electric and heat energy production, the optimization of the production distribution between units, the development of production and economic NPP control

  8. NPP training simulators in Hungary experience in development and utilization

    International Nuclear Information System (INIS)

    Janosy, J.S.

    1996-01-01

    The construction of the only NPP in Hungary - the Paks NPP - started in 1975. The four units of VVER-440/213 were connected to the grid in 1982, 1984, 1986 and 1987. During the construction no simulator has been delivered with the power plant. Moreover, there were no state-of-art simulators in Central and Eastern Europe and in the former Soviet Union; not for the given type, not for civil use. The only simulator for the VVER-440 existing that time was made for the Loviisa NPP in Finland. This plant is not very similar to the Paks NPP; moreover, the pressure suppression system in the hermetical part of the primary circuit, the instrumentation and control systems, the main control room and the secondary circuit are completely different. Anyway, the training of Paks operators on this simulator was out of question - regardless the similarity problems. The design of the Paks NPP was made in the Soviet Union, therefore not too much design information was available in Hungary. During the creation of simulation models the authors had to rely mostly on common theory and measured performance. Besides the efforts to create a basic principle, full-scope replica and compact simulators there was a great need to use verified codes with more detailed models for better understanding the behavior and for evaluation of the safety. Thanks to these great efforts, the simulators were expanded to evaluate the performance of the trainees, for simulation of SBLOCA and LBLOCA events; the authors are checking and validating the operational procedures; soon they start the design of the functions of a new reactor protection system and they participate in international efforts to deliver training simulators to other VVER-440 power plants. The paper gives an overview of all these activities, referring to some key publications for each of them

  9. Planning for environmental restoration of the contaminated banks near NPP Bohunice

    International Nuclear Information System (INIS)

    Slavik, O.; Moravek, J.; Vladar, M.

    1995-01-01

    The 18 km long banks of the Bohunice NPP waste water recipient are contaminated by cesium-137 as a result of two accidents on the CO 2 cooled NPP A 1 unit in 1976 and 1977. Since 1992, all he contaminated waste waters dumping from NPP Bohunice has been carried out directly to the Vah River through a specially constructed 15 km long pipeline. The final extent of contamination in the Bohunice site is represented. The overall contaminated area in this site with cesium-137 activity above 1 Bq/g of soil is about 67000 m 2 and thus, the corresponding volume of top 20 cm thick soil layer is about 13000 m 3 . For optimizing less costly remedial measures (warning signs...) an agreed scenario with a pre-estimated factor factor collective dose 2.10 -7 man.Sv.y -1 /(m 2 .Bq 137 Cs.g -1 ) was applied. Limitation of individual effective doses according to a site specific stay scenario was also considered for this purposes with a limiting value of 0.25 mSv/y. Cost analysis of available remedial techniques were carried out, too. Two techniques have been selected for the contaminated banks restoration project: 1) removing/disposal of 20 cm soil top layer from steep and unengineered banks, and 2) mechanical dilution/fixation of contamination by clean 15 cm soil cover for the contaminated flat areas. Two-fold reduction of anticipated potential radiation risk were accepted, maximally, for the lastly mentioned technique, however cost saving is considerable (about 10-time lower the cost comparing to removing/disposal technique one). The basic acceptance limits AL for 137 Cs in soil and criteria size of continuously contaminated bank areas were derived as: AL 200 = 6.0 Bq/g and 800 m 2 (300 m) or AL 50 8.0 Bq/g and 200 m 2 (80 m) for removing/disposal of the soil on steep unengineered banks. For clean soil covering technique the resulting limits are in an interval AL 50C = 8 up to 16 Bq/g. According to the criteria developed, it is necessary to subject to restoration about 11000 m 2 of

  10. Determination of the NPP Cernavoda reactor building seismic response

    International Nuclear Information System (INIS)

    Krutzik, N.J.; Rotaru, I.; Bobei, M.; Mingiuc, C.; Serban, V.

    1997-01-01

    Seismic input for systems and equipment installed in buildings depends on: - the seismic movement in free field on site; - the building movement in the soil; - the building deflection. The percentage of the 3 movements for the system and equipment input, depends on the position of the systems and equipment inside the building as well on the type of the foundation soil. The type of the foundation soil is important because if it is stiff it transfers a lot of energy to the building, energy which amplify the movement of the building on the top. If the foundation soil is soft, it accommodates the overall movement of the building in the soil, amplifying the movement to lower levels and the building response is attenuated if a resonance phenomenon between the whole building movement and the seismic excitation does not exist. This input is given with the design floor response spectra (FRS), in the logarithmic scale and seismic anchor movement (SAM). The design floor response spectra for NPP Cernavoda U1 Nuclear Building were determined in several stages starting with simple models (STICK type) without twisting movement and ending with detailed 3-dimensional models. From the point of view of dynamic behavior, the Reactor Building can be considered to be made up of 4 sub-structures: the containment building, internal structures containing separate elements such as the reactor vault, the fuel transfer structure and itself. Each sub-structure has its own movement (some of the structures present also some local effects) which combines with the overall movement of the building in the soil and the seismic excitation produce the total movement so that the response spectrum for each point of the sub-structure is specific. One should note that for structures which also show the twisting effect, the selection of the points on the floor, for the determination on the response spectra, is an engineering decision so that the response should be relevant for the equipment installed on the

  11. Vandellos 1 NPP. Dismantling at the level 1

    International Nuclear Information System (INIS)

    Pla, E.; Perez Pallares, J.

    1998-01-01

    Because of the fire in a main turbogenerator in October 1989, the Spanish Ministry of Industry ordered the definitive shutdown of Vandellos 1 NPP. The tasks allowed to the owner in the Ministerial Order were: the reactor defueling, the operation radwaste conditioning. The size of the reactor core needed to prepare an adequate defueling plan in order to prevent the potential reactivity oscillations and ensure the refrigeration of the nuclear fuel remaining in the core. The operation radwastes were divided in four types, according to the conditioning method: the low level solid radwaste, the irradiated metallic materials, the resins and zeolites used for decontaminating the liquid effluents, the radwaste stored in three graphite silos. The low level solid radwastes were stored during operation in drums of 220 litres. Recently they were compacted at a pressure of 40 tones before to be shipped to en ENRESA disposal. The irradiated metallic materials are, essentially, some parts of the refuelling machine. For deactivating the liquid effluents, Vandellos 1 used both organic resins and zeolites. The presence of zeolites helps the cementation, but its rough surface makes difficult to flow in the pipes of the cementation plant. 35 m 3 of this mixture have been conditioned into 670 drums of 220 liters. Vandellos 1 has three silos designed to store the graphite sleeves (reactor fuel support). In the silo number 1 some other radwastes were stored, as low level solid radwastes and two fuel elements. An international request for tenders was made in order to undertake the extraction and conditioning all these radwastes. The project was awarded to the Spanish/French Consortium EQUIPOS NUCLEARES-FRAMATOME. The achievement of the graphite silos project needed to design specific devices for separating irradiated wires from graphite, and searching and extracting two fuel elements jumbled up with the graphite sleeves. The spent fuel ponds have been emptied and its internals confined

  12. NPP Krsko Lifetime Extension - Business Impact for Hrvatska Elektroprivreda

    International Nuclear Information System (INIS)

    Vrankic, K.; Krejci, M.; Lebegner, J.

    2006-01-01

    This paper deals with the analysis of possible business impacts for HEP in the case of NPP Krsko life extension. Due to numerous reasons nuclear power plant life extension of ten to twenty years is a common procedure abroad. Having this practise in mind as well as other circumstances in Croatian and Slovenian electric power system, the extension of NPP Krsko lifetime is considered to be a possible scenario. Foreseeable impacts of this decision are evaluated primarily with consideration of its effect on HEPs projected cash flows, though other aspects will be addressed as well. Preserving a well maintained production facility with an extraordinary operational record and stable, or possibly falling overall production costs seems as a very rational choice. This is particularly true having in mind expected rise of electricity demand and energy prices in the region. Having NPP Krsko in operation beyond 2023 implies that no replacement source for NPP Krsko capacity needs to be built. This means avoiding all costs connected with the construction and operation of the replacement plant, assuming it will be fossil fuelled. Due to the high uncertainty of the future fossil fuel prices, the avoidance of replacement plant operational cost is likely to prove as highly rewarding. It should be kept in mind that avoided costs also include the replacement plant greenhouse gases emission costs, thus further enlarging the list of value adding impacts. The latter is valid anticipating the ratification of the Kyoto protocol and joining the European emission trading scheme. In addition to that, the extension of NPP Krsko lifetime would mean that the majority of costs connected with the decommissioning and final waste disposal can be postponed further down the time line. This will have very positive financial and possibly technological impact. Other value creating effects for HEP that are foreseeable as a consequence of the plant lifetime extension include: maintaining the knowledge of

  13. Dose limit for emergency workers. Application of Fukushima-Daiichi NPP accident and problems for the future

    International Nuclear Information System (INIS)

    Sugai, Kenji

    2012-01-01

    Described are details of management for workers' personal exposure dose, of problems raised and of their solutions taken under various complicated conditions of Fukushima Daiichi Nuclear Power Plant (NPP) Accident (Mar. 2011). As the entrance/exit (en/ex) for the NPP site with regular control were impossible due to the hydrogen explosion which expanded the control area to 20 km distance from the site, Japan Football Village (J-Village) localizing at the border and Important Anti-seismic Building in the site were defined to be the bases of en/ex and of their control, respectively. Flooded 5,000 alarm pocket dosimeters (APD) by tsunami were not usable and only 320 APD remained available. At the quite early stage of working at the site, one representative worker in a group had only one APD. Management of internal exposure was also difficult essentially because the power source of the whole body counter was unavailable. At an early emergent stage alone, workers with higher dose than the limit (100 mSv for emergency) were observed, but >90% of workers were exposed to <50 mSv (the limit for the radiation worker). Six male Tokyo Electric Power Company (TEPCO) personnel were exposed to 250 mSv (specially defined dose limit) or more with the maximum 678.80 mSv, in whom the internal exposure due to radioiodine largely attributed. They were examined for their health by the expert doctors in National Institute of Radiological Sciences, were found free of abnormality and were to be followed up thereafter. Out of 19 female TEPCO personnel, two had exceeded the dose limit 5 mSv/3 mo and other 2, the annual limit 1 mSv. They received the examination by the industrial doctor, were found free of abnormality, but were decided not to work at the site. Recently, about 5,000 APD have been purchased for personal usage and dose management is conducted by bar-coding of individual workers, and internal exposure is managed with 11 whole body counters by once a month measurement in J

  14. A Radiological Survey Approach to Use Prior to Decommissioning: Results from a Technology Scanning and Assessment Project Focused on the Chornobyl NPP

    Energy Technology Data Exchange (ETDEWEB)

    Milchikov, A.; Hund, G.; Davidko, M.

    1999-10-20

    The primary objectives of this project are to learn how to plan and execute the Technology Scanning and Assessment (TSA) approach by conducting a project and to be able to provide the approach as a capability to the Chernobyl Nuclear Power Plant (ChNPP) and potentially elsewhere. A secondary objective is to learn specifics about decommissioning and in particular about radiological surveying to be performed prior to decommissioning to help ChNPP decision makers. TSA is a multi-faceted capability that monitors and analyzes scientific, technical, regulatory, and business factors and trends for decision makers and company leaders. It is a management tool where information is systematically gathered, analyzed, and used in business planning and decision making. It helps managers by organizing the flow of critical information and provides managers with information they can act upon. The focus of this TSA project is on radiological surveying with the target being ChNPP's Unit 1. This reactor was stopped on November 30, 1996. At this time, Ukraine failed to have a regulatory basis to provide guidelines for nuclear site decommissioning. This situation has not changed as of today. A number of documents have been prepared to become a basis for a combined study of the ChNPP Unit 1 from the engineering and radiological perspectives. The results of such a study are expected to be used when a detailed decommissioning plan is created.

  15. A Radiological Survey Approach to Use Prior to Decommissioning: Results from a Technology Scanning and Assessment Project Focused on the Chernobyl NPP

    International Nuclear Information System (INIS)

    Milchikov, A.; Hund, G.; Davidko, M.

    1999-01-01

    The primary objectives of this project are to learn how to plan and execute the Technology Scanning and Assessment (TSA) approach by conducting a project and to be able to provide the approach as a capability to the Chernobyl Nuclear Power Plant (ChNPP) and potentially elsewhere. A secondary objective is to learn specifics about decommissioning and in particular about radiological surveying to be performed prior to decommissioning to help ChNPP decision makers. TSA is a multi-faceted capability that monitors and analyzes scientific, technical, regulatory, and business factors and trends for decision makers and company leaders. It is a management tool where information is systematically gathered, analyzed, and used in business planning and decision making. It helps managers by organizing the flow of critical information and provides managers with information they can act upon. The focus of this TSA project is on radiological surveying with the target being ChNPP's Unit 1. This reactor was stopped on November 30, 1996. At this time, Ukraine failed to have a regulatory basis to provide guidelines for nuclear site decommissioning. This situation has not changed as of today. A number of documents have been prepared to become a basis for a combined study of the ChNPP Unit 1 from the engineering and radiological perspectives. The results of such a study are expected to be used when a detailed decommissioning plan is created

  16. Rupture of DN 500 - design basic accident at units 3 and 4 of Kozloduy NPP

    International Nuclear Information System (INIS)

    Uruchev, V.; Vassilev, P.; Ivanova, A.; Sartmadjiev, A.

    2005-01-01

    The original design of Kozloduy NPP Units 3 and 4 assumes as Design Basis Accident (DBA) the rupture of DN 32 mm primary pipeline, while an initial event of double-sided guillotine break of primary pipeline with maximal diameter is not considered. In the course of units modernization it have been demonstrated once and again that both the emergency core cooling systems and the localization systems can cope with larger and larger primary circuit leaks. After the installation of a Jet-Vortex Condenser (JVC) at Units 3 and 4 it was substantiated that, the integrity of the hermetic rooms is ensured even in case of double-sided guillotine break of a primary circuit pipeline with maximal diameter (DEGB). The technical justification of the jet-vortex condenser, elaborated by VNIAEC, contains calculations determining both the source term and the doses obtained outside the NPP site after LOCA DN 500. LOCA DN 500 is considered in these analyses as a beyond design basis accident and it is so included in the SAR and approved by the Nuclear Regulatory Agency (NRA). The thermo-hydraulic calculations performed later on show that the emergency core cooling systems can cope with this initial event at conservative assumptions. In order to classify this initiating event as a design basis accident it is necessary to demonstrate that the core cooling criteria are fulfilled and the internal and external doses outside the NPP site are within the permissible limits fixed for design basis accident by the Bulgarian regulatory body (NRA), when using conservative assumptions. For this purpose two consecutive studies were performed - evaluation of the DEGB probability and categorization of the initial event according to the contemporary regulations acting in Republic of Bulgaria. The presented report summarizes the results of the performed conservative analyses of double-sided guillotine break accident of main circulation line taking into account the probability of rupture of large diameter

  17. The Information System for Operational Activity Organization as a Tool for Configuration Management in NPP

    International Nuclear Information System (INIS)

    Manchev, B. L.; Yordanova, V. S.; Nenkova, B. G.

    2008-01-01

    The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained. This conformity is maintained during the entire life cycle of the facility. CM ensures that during the entire operational life of the plant the following requirements are met: The basic design requirements of the plant are established, documented and maintained; The physical structures, systems and components (SSC) of the plant are in conformity with the design requirements; The physical and functional characteristics of the plant are correctly incorporated in the operational documentation and the documentation for repair, as well as in the documents for tests and training; The changes in the design documentation are incorporated in the physical configuration and the operative documentation; The changes in the design are minimized by management process for review according to approved criteria; The changes proposed in the equipment and documentation of the plant are estimated entirely with the purpose of determining their effect and are reviewed and approved by appropriate managing staff before their introduction. The information system for organization of the operational activity (IS OOA) consists of several modules used for storage and retrieval of data for different aspects of the operation of the equipment at the site of Kozloduy NPP, as defects and failures, design requirements and bases, design data and characteristics, tests, life time, maintenance and repair, as well as changes in the design or the design documentation. IS OOA consists of single relational database and provides built-in connections to the database of the SmartDoc system for control of the documentation, as well as to the database for human resources. Central place in IS OOA is taken by the 'Equipment' module while all other modules are connected with the identification data of the structures

  18. Some specific features of NPP Paks fuel utilisation

    International Nuclear Information System (INIS)

    Nemes, Imre; Pos, Istvan; Patai-Szabo, Sandor

    2005-01-01

    In the presentation some special and interesting aspects of Paks NPP fuel application practice are shown. In different cycles of Paks NPP units 100 s of fuel assemblies has been used after shorter or longer cooling in the spent fuel pond. Some cases the reload contained large number of assemblies having 6-10 year cooling time before the reinsertion. The experiences have shown larger deviation of measured neutron-physical parameters from the calculated ones. The reason of larger deviation has been investigated. Calculations shown that the part of deviation can be eliminated if we calculate more actinides explicitly in the refueling design code. Presentation also shows the general experiences of such fuel application: assemblies could be operated in reliable way keeping rigorously the assembly burnup limit. (author)

  19. Reactor building seismic analysis of a PWR type - NPP

    International Nuclear Information System (INIS)

    Kakubo, Masao

    1983-01-01

    Earthquake engineering studies raised up in Brazil during design licensing and construction phases of Almirante Alvaro Alberto NPP, units 1 and 2. State of art of soil - structure interaction analysis with particular reference to the impedance function calculation analysis with particular reference to the impedance function calculation of a group of pile is presented in this M.Sc. Dissertation, as an example the reactor building dynamic response of a 1325 MWe NPP PWR type is calculated. The reactor building is supported by a pile foundation with 2002 end bearing piles. Upper and lower bound soil parameters are considered in order to observe their influence on dynamic response of structure. Dynamic response distribution on pile heads show pile-soil-pile interaction effects. (author)

  20. Zinc addition at ANGRA 2 NPP. A preliminary report

    International Nuclear Information System (INIS)

    Silva e Souza, U.C.; Ruebenich, M.N.; Azevedo, I.S.

    2002-01-01

    As a result of an Eletronuclear and Siemens agreement planned to be applied in Angra 2 NPP zinc addition used data from the joint German utilities/Siemens qualification program were as well as operating gathered at the German lead pressurized water reactors plants. The qualification program main objective was to demonstrate the process efficiency, to investigate interactions between zinc and oxide layers, to elaborate a dosing concept, to provide compatibility assessment with systems and components and to develop implementation strategy, defining limiting values and diagnostic parameters and a surveillance program. Angra 2 NPP is the world's first power plant using this program since its start-up in July 15, 2001. Its design features (core design, reactor coolant pumps and others) were also reviewed and compared with corresponding data from German Siemens PWR's, adding zinc. The data showed that the compatibility of method with Angra 2 plant was ensured. (authors)

  1. Low-dose effects hypothesis and observations on NPP personal

    International Nuclear Information System (INIS)

    Georgieva, R.; Acheva, A.; Boteva, R.; Chobanova, N.; Djounova, J.; Gyuleva, I.; Ivanova, K.; Kurchatova, G.; Milchev, A.; Negoicheva, K.; Nikolov, V.; Panova, D.; Pejankov, I.; Rupova, I.; Stankova, K.; Zacharieva, E.

    2013-01-01

    In the modern world the use of various sources of ionizing radiation is nearly ubiquitous. They have numerous applications in industry, medicine, science, agriculture, etc. Radiation doses to workers nevertheless are commensurable to the natural background exposure. Published data on the health effects of occupational radiation exposure are often contradictory. Addressing the issue of „negative” (bystander effects, genomic instability) and „positive” (adaptive response, radiation hormesis) effects of low doses is important and has a significant social and economic impact. In this paper we summarize the results of our extensive monitoring of nuclear power plant (NPP) staff. We believe it is a cohort suitable for analysis of health effects at low doses, because of their good medical and dosimetric control. Our results rather support the idea of absence of adverse health effects in NPP workers. (author)

  2. Specific problems in Kozloduy municipality, concerning NPP operation and decommissioning

    International Nuclear Information System (INIS)

    Pironkova, L.

    2000-01-01

    The only nuclear power plant in Bulgaria, which operates for 25 years is located in Kozloduy. Kozloduy municipality is situated in the northern part of Danube plane, includes the administrative center and four villages. It is 200 km far from Sofia and 80 km from the regional center Vratza. The Kozloduy NPP operates 6 units of total capacity 3760 MW, producing more than 40% of the electricity needs in Bulgaria. Settled and recurring problems of the municipality are related to economic, geographical, demographic and administration issues. Future problems will be related to forthcoming reactor shutdown and decommissioning. This involves economic problems, possible bankruptcies of local firms servicing the NPP, decreasing budget and living standard, expected restrictions of social programs, increasing unemployment, possible changes in demographic structure of population

  3. Safety analysis of Ignalina NPP during shutdown conditions

    International Nuclear Information System (INIS)

    Kaliatka, A.; Uspuras, E.

    2000-01-01

    The accident analysis for the Ignalina NPP with RBMK-1500 reactors at normal operating conditions and at minimum controlled power level (during startup of the reactor) has been performed in the frame of the project I n-Depth Safety Assessment of the Ignalina NPP , which was completed in 1996. However, the plant conditions during the reactor shutdown differ from conditions during reactor operation at full power (equipment status in protection systems, set points for actuation of safety and protection systems, etc.). Results of RELAP5 simulation of two worst initiating events during reactor shutdown - Pressure Header rupture in case of steam reactor cooldown as well as Pressure Header rupture in case of water reactor cooldown are discussed in the paper. Results of analysis shown that reactor are reliably cooled in both cases. Further analysis for all range of initial events during reactor shutdown and at shutdown conditions is recommended. (author)

  4. Challenges of Ignalina NPP Decommissioning - View of Lithuanian Operator

    International Nuclear Information System (INIS)

    Aksionov, P.

    2017-01-01

    The state enterprise Ignalina Nuclear Power Plant (INPP) operates 2 similar design units of RBMK-1500 water-cooled graphite-moderated channel-type power reactors (1500 MW electrical power). INPP is carrying out the decommissioning project of the 2 reactors which includes: -) the retrieval of the spent nuclear fuel from the power units and its transportation into the Interim Spent Fuel Storage Facility; -) equipment and building decontamination and dismantling; -) radioactive waste treatment and storage; and -) the operation of key systems to ensure nuclear, radiation and fire protection. Ignalina NPP decommissioning project is planned to be completed by 2038. The presentation will be focused on the ongoing decommissioning activities at Ignalina NPP. The overview of main aspects and challenges of INPP decommissioning will be provided

  5. Social problems and territorial experiences from closing down Tihange NPP

    International Nuclear Information System (INIS)

    Lizin, A.M.

    2000-01-01

    The town of Huy, better known by the name of the NPP Tihange, which is the nearby village, accounts to 50,000 inhabitants including the surrounding region. An Advisory Committee at a community level was set up concerned with the emergency services and the NPP related problems. One of the outstanding problems is the planned interim storage for radioactive waste. The unsolved question of long term storage in Belgium resulted in the fact that general situation is not promising for launching the debate on the future of nuclear energy. The mission of the delegation from Huy visited Tokaimura with the aim to measure the scale of real responsibilities and the concern against nuclear power that the accident created in the population

  6. Prioritization of the recovery actions in the Krsko NPP SAMGs

    International Nuclear Information System (INIS)

    Basic, Ivica; Vrbanic, Ivan; Bilic-Zabric, Tea

    2006-01-01

    Replacement of the old SG (Steam Generators) and the characteristic of new ones raises the question of proper severe accident management (SAM) strategy, which leans on WOG (Westinghouse Owners Group) generic approach philosophy that repair and recovery actions have the first priority. In the current revision of NPP Krsko SAMGs (Severe Accident Management Guidelines) under DFC (Diagnostic Flow Chart) decision making process, water supply to the SG has higher priority than the re-injection of water into the core. NPP Krsko reconsideration of the current highest priority recovery action (inject water into the SG) and potential revision of Severe Accident Management Guidelines is the subject of this paper. Phenomenology Evaluations were performed by MAAP (Modular Accident Analysis Program) 4.0.5 code. (author)

  7. Some questions of optimization in the personnel dosimetry at NPP

    International Nuclear Information System (INIS)

    Liberman, A.N.; Petrov, V.I.; Bronshtejn, I.Eh.

    1978-01-01

    Some possible ways of optimizing the radiation monitoring of personnel of nuclear power plants (NPP) are considered. For premises within the zone of a strict operating regime, it is proposed that the intervals between periods of monitoring be shortened if the operating conditions are normal. To improve the monitoring of activity of water in the primary circuit, it is considered desirable to provide all NPP with a system of automatic radiation monitoring having input to the control panel. Where the work involves opening of primary circuit communications or deactivation of equipment and also in cases of emergency, it is proposed that, in addition to routine monitoring, gamma-spectrometric or radiochemical analysis of the isototip composition of contaminants be carried out. Because of the absence of measurable quantities of incorporated radionuclides in the vast majority of those working in the strict regime zone, it is suggested that the number of persons subject to systematic individual monitoring of internal radiation be limited

  8. The intelligent system for accident identification in NPP

    International Nuclear Information System (INIS)

    Hernandez, Jorge Luis.

    1998-01-01

    Accidental situations in NPP are of greet concern for operators, the facility, regulatory bodies and the environment. This work proposes a design of intelligent system aimed to assist the operator in the process of decision making when initiator events with higher relative contribution to the reactor core damage occur. The intelligent System uses the results of the pre operational Probabilistic Safety Assessment and the Thermal hydraulic Safety Analyses of the NPP Juragua as source for building its knowledge base. The nucleus of the system is presented as a design of an intelligent hybrid system from the combination of the artificial intelligence techniques: fussy logic and artificial neural networks. The system works with variables from the process of the firsts circuit, second circuit and the containment and it is presented as a model for the integration of safety analyses in the process of decision making by the operator when tackling with accidental situations

  9. Performance of the NPP CrIS Sensor

    Science.gov (United States)

    Emch, P. G.; Farrow, S. V.; Gu, D.; Wang, C.; Hagan, D. E.; Sabet-Peyman, F.

    2009-12-01

    This paper discusses the performance of the first Cross-track Infrared Sounder (CrIS) flight instrument and its data product performance. Together with ATMS, the CrIS sensor is a critical payload for National Polar-orbiting Operational Environmental Satellite System (NPOESS) providing temperature and moisture profiles, and will first fly on the NPOESS Preparatory Project (NPP) mission, the risk reduction flight for NPOESS. NPOESS is the next generation weather and climate monitoring system for the Department of Defense and National Oceanic and Atmospheric Administration (NOAA), being developed under contract by Northrop Grumman Aerospace Systems. The NPP flight sensor has recently completed thermal vacuum, electro-magnetic interference, and vibration testing. By the time of the presentation, the sensor sell-off is expected to have been completed as well. An overview of the sensor, the FM1 measurement performance, and details of the retrieval algorithms will be provided in this presentation.

  10. Probabilistic safety analysis forecast for Trillo 1 NPP

    International Nuclear Information System (INIS)

    Carretero Fernandino, J.A.; Martin Alvarez, L.; gomez, F.; Cuallado, G.

    1995-01-01

    The performance of Probabilistic Safety Analyses (PSA) at Trillo 1 NPP is facing a number of challenges, unprecedented in previous PSAs carried out in Spain, due to the particular design characteristics of the plant. On account of this, it has been necessary to implemented specific approaches and methodological alternatives to perform a PSA which, while maintaining detail level and requirements in line with PSAs carried out previously in Spain, offers a solution technically adapted to the characteristics of the SIEMENS-KWU design as opposed to other Spanish reactors with a basic Westinghouse-General Electric design, which are based on standard US design. The purpose of this paper is to describe the most significant characteristics of the PSA at Trillo 1 NPP and the methodology used to date, taking into account current project progress

  11. Application of reliability centered maintenance to Embalse NPP

    International Nuclear Information System (INIS)

    Torres, Antonio; Perdomo, Manuel; Fornero, Damian; Corchera, Roberto

    2010-01-01

    One of the most recent applications of Probabilistic Safety Analysis to Embalse NPP is the Safety Oriented Maintenance Program developed through the Reliability Centered Maintenance (RCM) methodology. Such an application was carried out by a cooperated effort between the staff of nuclear safety department of NPP and experts from Instituto Superior de Tecnologias y Ciencias Aplicadas of Cuba. So far 6 technological systems have been analyzed with important results regarding the optimization of preventive and predictive maintenance program of those systems. Any tasks of RCM were automated via MOSEG code. The results of this study were focused on the elaboration and modification of the Preventive Program, prioritization of stocks, reorientation of predictive techniques and modification in the time parameters of maintenance. (author)

  12. Change in properties of graphite on stake of Obninsk NPP

    International Nuclear Information System (INIS)

    Virgul'ev, Yu.S.; Gundorov, V.V.; Kalyagina, I.P.; Belinskaya, N.T.; Dolgov, V.V.; Komissarov, O.V.; Stuzhnev, Yu.A.

    1997-01-01

    The results of testing the graphite from the AM-1 reactor masonry at the Obninsk NPP for its operation period are discussed. It is shown that the masonry graphite state after 42 years of the reactor operation remains satisfactory in the most cells inspected. Separate cells requiring a repair resulted from oxidation are characterized by strength decreased by several times. The laws of radiation changes in graphite properties are analyzed. The conclusion on possibility of the further masonry operation is drawn

  13. Investigation into possibilities of concrete recycling after NPP decommissioning

    International Nuclear Information System (INIS)

    Maehkava, N.

    2003-01-01

    Investigations into the expansion of using disassembled concrete of the Tokai NPP (Japan) are conducted. Two kinds of concretes were analyzed with the aim to use as regenerated filler: with building solution on the surface of sample and without building solution removed highly effective treatment. Problems of economy of concrete recycling and environmental impacts are considered. Previous investigations demonstrate the efficiency of using regenerated filler [ru

  14. Novel technology for hydrothermal treatment of NPP evaporator concentrates

    International Nuclear Information System (INIS)

    Avramenko, Valentin; Dobrzhansky, Vitaly; Marinin, Dmitry; Sergienko, Valentin; Shmatko, Sergey

    2007-01-01

    A novel technology was developed for treatment of evaporator concentrates produced as a result of operation of evaporation devices comprising the main component of special water purification systems of nuclear power plants (NPP). The developed technology includes a hydrothermal (T=250-300 deg. C and P=80-120 bar) processing of evaporator concentrates in oxidation medium in order to destruct stable organic complexes of cobalt radionuclides and remove these radionuclides by oxide materials formed during such a processing. The cesium radionuclides contained in evaporator concentrates are removed by a conventional method-through application of one of the developed composite sorbents with ferrocyanides of transition metals used as active agents. Extensive laboratory studies of the processes occurring in evaporator concentrates under hydrothermal conditions were performed. It was shown that hydrothermal oxidation of evaporator concentrates has a number of advantages as compared to traditional oxidation methods (ozonization, photo-catalytic, electrochemical and plasma oxidation). A laboratory installation was built for the flow-type hydrothermal oxidation of NPP evaporator concentrates. The obtained experimental results showed good prospects for the developed method application. On the basis of the results obtained, a pilot installation of productivity up to 15 l/hour was developed and built in order to work out the technology of evaporator concentrates hydrothermal treatment. The pilot tests of the hydrothermal technology for evaporator concentrates hydrothermal treatment were performed for 6 months in 2006 at the 1. reactor unit of the Novovoronezhskaya NPP (Voronezh Region, Russia). Optimal technological regimes were determined, and estimations of the economic soundness of the technology were made. The advantages of the presented technology in terms of management of concentrated liquid radioactive wastes (LRW) at nuclear cycle facilities, as compared to other methods

  15. International Collaboration in the Development of NPP Software

    International Nuclear Information System (INIS)

    Jiang, S.; Liu, L.; Yu, H.

    2015-01-01

    In this paper, we first review the progress and current status of international collaboration and technical exchange in the development of nuclear power plant (NPP) software by The State Nuclear Power Software Development Center (SNPSDC) in China. Then we discuss the importance of the international collaboration and exchange in the trend of globalisation of NPP technology. We also identify the role and contribution of professional women in this process. SNPSDC, the first professional software development centre for NPP in China, has been developing COSINE — a self-reliance NPP design and analysis software product with China brand—since 2010. Through participating in OECD/NEA’s joint projects, such as ROSA-2 Project, PKL–3 Project, HYMERES Project and ATLAS Project, SNPSDC shared data with other countries involved with respect to particular areas, such as high quality reactor thermal hydraulics test data. SNPSDC’s engineers have also been actively participating in international technical and research exchange for presenting their innovative work to the community while learning from peers. Our record shows that over 30 papers have been presented in international conferences with respect to nuclear reactor thermal hydraulics, safety analysis, reactor physics and software engineering within the past 4 years. The above international collaboration and technical exchange helped SNPSDC’s engineers to keep up with the state-of-art technology in this field. The large amount of valuable experimental data transferred to SNPSDC ensured the functionality, usability and reliability of software while greatly reduced the cost and shortened the cycle of development. Female engineers and other employees of SNPSDC either drove or got actively involved in a lot of aspects of the above collaboration and exchange, such as technical communication, business negotiation and overseas affairs management. These professional women played an irreplaceable role in this project by

  16. A way of Dukovany NPP to privatization and liberalized market

    International Nuclear Information System (INIS)

    Kouklik, I.

    2001-01-01

    This presentation describes the current situation in the Dukovany NPP with two main upcoming future phenomena - privatization of CEZ company and preparation for liberalized electricity market. Considerations about level of safety, investment costs and competitiveness of Dukovany Nuclear Power Plant in liberalization process is described together with a comparison of some safety features of the world's NPPs. Results of this comparison are used for consideration and evaluation of some require modifications effectiveness. (author)

  17. Radionuclides in mushrooms after accident on Chernobyl NPP

    International Nuclear Information System (INIS)

    Zarubina, N.E.; Trishin, V.V.

    2004-01-01

    Purpose of carried out studies was to check the influence of accident on nuclear object ChNPP with ejection in environment of biologically dangerous radionuclides on accumulation by mushrooms - basidiomizents 137 Cs (content of 90 Sr in bodies of mushrooms less on 3-4 orders). In territory of a modern zone rehabilitation before accident (1981-1985) the sole simulated radionuclide - global 137 Cs was fixed in mushrooms

  18. Internal Audits and Quality Assurance Surveillance in NPP Krsko

    International Nuclear Information System (INIS)

    Cavajda, M.; Bracic, I.

    1996-01-01

    This paper is describing establishment of the requirements for the development and execution of the Internal Audit and Quality Assurance Surveillance Program in the NPP Krsko, to identify relevant regulatory commitment and other documents, and to exhibit different functional areas, levels and work categories and factors that impact selecting and scheduling an audit or surveillance. It is not intention of this paper to explain how and by whom an audit or surveillance has to be done. (author)

  19. Achieving zero fuel failure rates at Armenian NPP

    International Nuclear Information System (INIS)

    Muradyan, T.

    2015-01-01

    In spite of the zero fuel failure rates in Armenian NPP there is a continued high level of interest. The generally accepted goal of achieving a zero failure rate requires detailed knowledge of existing failure mechanisms, their root causes and remedies. In this paper the foreign material management; water-chemistry regime; refuel machine management system and the transition into the use of vibration proof fuel of average enrichment 3,82% are presented

  20. NPP component maintenance and life management in Russia

    International Nuclear Information System (INIS)

    Tutnov, I.; Lyssakov, V.

    2002-01-01

    This report represents the conceptual strategies (ideas) on life management programs for nuclear power plants. Use of the optimum programs for NPP's NDE, maintenance service, operation and service life can provide the best economic benefit for the utilities. The paper presents general approaches to life management, maintenance service, and risks of operating and service life of NPPs in Russia. The report offers some optimized ways for the solution of these important tasks

  1. Full scope simulator commissioning and training experience at Cernavoda NPP

    International Nuclear Information System (INIS)

    Balan, M.

    2000-01-01

    The paper presents the experience gained during commissioning and the initial use of the CANDU training full-scope simulator for operation personnel at Cernavoda NPP. The full-scope simulator as an integral part of the training programs that take place in Cernavoda Nuclear Training Department (CNTD), is mainly used for the development of operational skills, knowledge and attitudes required to operate the plant in a safe and efficient manner. (author)

  2. Improved Nuclear Power Plant maintenance. Application to Cofrentes NPP

    International Nuclear Information System (INIS)

    Serradell, V.

    2002-01-01

    The Industrial Safety and Environment Group (MEDASEGI) of the Valencia Polytechnic University (UPV) develops its activities in the fields of environmental radioactivity metrology and risk analysis and management aimed at improving industrial safety. The different lines of research developed by this group include collaboration with Cofrentes NPP. This collaboration began in 1993 and has primarily focused on issues related to improved maintenance and currently on life management. (Author)

  3. NPP Krsko containment environmental conditions during postulated accident

    International Nuclear Information System (INIS)

    Kozaric, M.; Cavlina, N.; Spalj, S.

    1989-01-01

    This paper presents NPP Krsko containment pressure and temperature increase during Loss of Coolant Accident (LOCA) and Main Steam Line Break (MSLB). Containment environmental condition calculation was performed by CONTEMPT4/MOD4 computer code. Design accident calculations were performed by RELAP4/MOD6 and RELAP5/MOD1 computer codes. Calculational abilities and application methodology of these codes are presented. The CONTEMPT code is described in more detail. The containment pressure and temperature time distribution are presented as well. (author)

  4. Technical and economical problems of decommissioning nuclear power plants (NPP) in Russia

    International Nuclear Information System (INIS)

    Vaneev, M.

    2001-01-01

    The introduction per new century has brought to atomic Engineering many new problems. One of them, which has got a serious urgency, we now shall consider. It is a problem of decommissioning NPP in Russia. By 2014 all maintained nowadays NPP in Russian Federation will develop the regular service life. And all of them on idea should be removed from operation. But, as we understand, in today's difficult economic conditions, to it NPP the procedure of prolongation of service life will be applied, and where it is impossible by virtue of the various reasons, the procedure of translation NPP in nuclear - safe condition and in a mode of a long storage under supervision, before acceptance of the decision about a method and way of financing of a decommissioning will be applied. Possible the following variants will be: use platforms of the old NPP for construction new NPP, or using as burial place NPP. The variant of a decommissioning up to a condition 'green grass' is represented unprofitable because of its dearness. The similar decommissioning was carried out in Japan. Was removed from operation research reactor of a type WWR. The expenses for this method of a decommissioning considerably surpass expenses for a method of a burial place NPP basically because of high cost of dismantle and transportation in long-term storehouses of the 1 contour equipment. The most urgent problem of decommissioning NPP, which developed their regular service life - is financing this final stage of a exploitation cycle of the block. I shall remind, that the financing is carried out from uniform fund of decommissioning. The formation of this fund occurs by deduction 1.3 % of cost of the put electric power to the consumers by all maintained NPP of Russia. The expenditure of this fund is carried on time on some tens years. They are spent for 3 basic stages: preparation to decommissioning NPP, long endurance under supervision, dismantle and burial the NPP equipment. Nowadays on faculty NPP MPEI

  5. Robot dispatching Scenario for Accident Condition Monitoring of NPP

    International Nuclear Information System (INIS)

    Kim, Jongseog

    2013-01-01

    In March of 2011, unanticipated big size of tsunami attacks Fukushima NPP, this accident results in explosion of containment building. Tokyo electric power of Japan couldn't dispatch a robot for monitoring of containment inside. USA Packbot robot used for desert war in Iraq was supplied to Fukushima NPP for monitoring of high radiation area. Packbot also couldn't reach deep inside of Fukushima NPP due to short length of power cable. Japanese robot 'Queens' also failed to complete a mission due to communication problem between robot and operator. I think major reason of these robot failures is absence of robot dispatching scenario. If there was a scenario and a rehearsal for monitoring during or after accident, these unanticipated obstacles could be overcome. Robot dispatching scenario studied for accident of nuclear power plant was described herein. Study on scenario of robot dispatching is performed. Flying robot is regarded as good choice for accident monitoring. Walking robot with arm equipped is good for emergency valve close. Short time work and shift work by several robots can be a solution for high radiation area. Thin and soft cable with rolling reel can be a good solution for long time work and good communication

  6. Robot dispatching Scenario for Accident Condition Monitoring of NPP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jongseog [Central Research Institute of Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)

    2013-05-15

    In March of 2011, unanticipated big size of tsunami attacks Fukushima NPP, this accident results in explosion of containment building. Tokyo electric power of Japan couldn't dispatch a robot for monitoring of containment inside. USA Packbot robot used for desert war in Iraq was supplied to Fukushima NPP for monitoring of high radiation area. Packbot also couldn't reach deep inside of Fukushima NPP due to short length of power cable. Japanese robot 'Queens' also failed to complete a mission due to communication problem between robot and operator. I think major reason of these robot failures is absence of robot dispatching scenario. If there was a scenario and a rehearsal for monitoring during or after accident, these unanticipated obstacles could be overcome. Robot dispatching scenario studied for accident of nuclear power plant was described herein. Study on scenario of robot dispatching is performed. Flying robot is regarded as good choice for accident monitoring. Walking robot with arm equipped is good for emergency valve close. Short time work and shift work by several robots can be a solution for high radiation area. Thin and soft cable with rolling reel can be a good solution for long time work and good communication.

  7. NPP Evaluation, backfitting and life extension. An engineering viewpoint

    International Nuclear Information System (INIS)

    Gonzalez Lopez, A.

    1993-01-01

    During the decade of the 80s, the Owners of the two oldest operating plants in Spain designed and built during the 60s - namely, Jose Cabrera NPP, a Westinghouse PWR, and Santa Maria de Garona NPP, a GE BWR- undertook the following important programs: 1. A far-reaching Systematic Evaluation Program (SEP) for the Jose Cabrera NPP consisting in the systematic safety review of the plant design, followed by the necessary hardware modifications, to upgrade it and make it comply with current safety criteria, and a Plant Upgrading Program for the Garona Nuclear Station focusing on specific topics affecting GE BWR Mark-I type plants of the same vintage. 2. A Remaining Life Management Program to ensure that the units, after extensive backfittings and high capital investment, would complete their design life, leaving open the option for plant life extension. These two units are today considered by the Spanish nuclear industry as the pilot plants for Plant Life Extension (PLEX) programs for PWRs and BWRs in our country The purpose of this paper is to summarize the principal lessons learned from EMPRESARIOS AGRUPADOS' participation as an architect-engineering organization in the engineering, design and implementation of these Programs. They are practical examples of positive experience which could be considered as a reference when carrying out similar programs for other plants. (author)

  8. Feed water distribution pipe replacement at Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Savolainen, S.; Elsing, B. [Imatran Voima Loviisa NPP (Finland)

    1995-12-31

    Imatran Voima Oy operates two WWER-440 reactors. Unit 1 has been operating since 1977 and unit 2 since 1981. First damages of feed water distribution (FWD) pipe were observed in 1989. The FWD-pipe T-connection had suffered from severe erosion corrosion damages. Similar damages have been been found also in other WWER-440 type NPPs. In 1989 the nozzles of the steam generator YB11 were inspected. No signs of the damages or signs of erosion were detected. The first damaged nozzles were found in 1992 in steam generators of both units. In 1992 it was started studying different possibilities to either repair or replace the damaged FWD-pipes. Due to the difficult conditions for repairing the damaged nozzles it was decided to study different FWD-pipe constructions. In 1991 two new feedwater distributors had been implemented at Dukovany NPP designed by Vitckovice company. Additionally OKB Gidropress had presented their design for new collector. In spring 1994 all the six steam generators of Rovno NPP unit 1 were replaced with FWD-pipes designed by OKB Gidropress. After the implementation an experimental program with the new systems was carried out. Due to the successful experiments at Rovno NPP Unit 1 it was decided to implement `Gidropress solution` during 1994 refueling outage into the steam generator YB52 at Loviisa 2. The object of this paper is to discuss the new FWD-pipe and its effects on the plant safety during normal and accident conditions. (orig.).

  9. The Service Life Evaluation for Concrete Structure of NPP

    International Nuclear Information System (INIS)

    Lee, Choon Min; Kim, Seong Soo; Bae, Sung Hwan; Sik, Yoon Eui

    2014-01-01

    Prolonged exposure to the marine environment degrades the durability of concrete and shortens the service life of concrete due to degradation factors such as chloride, carbonation, freezing and thawing, sulfate. Therefore, many country's organizations like the Korea Concrete Institute (KCI), the American Concrete Institute (ACI), the International Federation for Structural Concrete (FIB), the American Society for Testing and Material (ASTM) which recognized the seriousness of this deterioration proposed equation models to evaluate the service life for the concrete structures. As a result, this paper is to especially consider the service life evaluation using these equation models for concrete structure of NPP in Korea compared with 60 years as a design service life. The concrete durability evaluation for Shin-Hanul NPP units 1 and 2 is carried out by using typically proposed assessment models in domestic and foreign standard. It is confirmed that the service life of concrete durability for each of deterioration factors is significantly higher than 60 years as a design service life. As a result, the study of combined deterioration for the concrete structures of NPP in future is positively necessary and maintenance control through regular monitoring should be conducted to secure safety margin basis

  10. Financing nuclear projects. Case study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.; Lebedev, A.; Dobrin, M.

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) in a country is a major undertaking for all entities involved, due to the necessity of planning work and co-ordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the people. Having in view the specific investment cost (relatively high) for a NPP, to find an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and second, the mathematical modelling of the financing structure effects on the project. In this respect, the paper proposed will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentations requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, power purchase contract, etc.) The case study will be focused on the phases achieved in order to promote the Unit 2 Cernavoda NPP completion works project. (author)

  11. Integrated tool for NPP lifetime management in Spain

    International Nuclear Information System (INIS)

    Francia, L.; Lopez de Santa Maria, J.; Cardoso, A.

    2001-01-01

    The project for the Integrated Nuclear Power Plant Lifetime Management System SIGEVI (Sistema Integrado de GEstion de VIda de Centrales Nucleares) was initiated in April 1998 and finalized in December 2000, the main objective of the project being to develop a computer application facilitating the assessment of the condition and lifetime of nuclear power plant components. This constituted the second phase of a further-reaching project on NPP Lifetime Management. During the first phase of this project, carried out between 1992 and 1995, the methodology and strategy for the lifetime management of the Spanish NPP's were developed. Among others, degradation phenomena were assessed and the most adequate methods for their monitoring were defined. The SIGEVI Project has been performed under the management of UNESA (Spanish Electricity Association) and with the collaboration of different engineering firms and research institutes (Tecnatom, Empresarios Agrupados, Ufisa, Initec and IIT), with Vandellos II as the pilot plant. The rest of the Spanish NPP's have also actively participated through the Project Steering Committee. The following sections describe the scope, the structure and the main functionalities of the system SIGEVI. (authors)

  12. Integrated tool for NPP lifetime management in Spain

    Energy Technology Data Exchange (ETDEWEB)

    Francia, L. [UNESA, Madrid (Spain); Lopez de Santa Maria, J. [ASCO-Vandellos 2 NPPs l' Hospitalet de l' Infant, Tarragona (Spain); Cardoso, A. [Tecnatom SA, Madrid (Spain)

    2001-07-01

    The project for the Integrated Nuclear Power Plant Lifetime Management System SIGEVI (Sistema Integrado de GEstion de VIda de Centrales Nucleares) was initiated in April 1998 and finalized in December 2000, the main objective of the project being to develop a computer application facilitating the assessment of the condition and lifetime of nuclear power plant components. This constituted the second phase of a further-reaching project on NPP Lifetime Management. During the first phase of this project, carried out between 1992 and 1995, the methodology and strategy for the lifetime management of the Spanish NPP's were developed. Among others, degradation phenomena were assessed and the most adequate methods for their monitoring were defined. The SIGEVI Project has been performed under the management of UNESA (Spanish Electricity Association) and with the collaboration of different engineering firms and research institutes (Tecnatom, Empresarios Agrupados, Ufisa, Initec and IIT), with Vandellos II as the pilot plant. The rest of the Spanish NPP's have also actively participated through the Project Steering Committee. The following sections describe the scope, the structure and the main functionalities of the system SIGEVI. (authors)

  13. Preparation for Early Termination of Ignalina NPP Operation

    International Nuclear Information System (INIS)

    Poskas, P.; Poskas, R.

    2003-01-01

    Seimas (Parliament of Lithuania) approved updated National Energy strategy where it is indicated that first Unit will be shutdown before the year 2005 and second Unit in 2009 if funding for decommissioning is available from EU and other donors. In accordance to Ignalina NPP Unit 1 Closure Law the Government of Lithuania approved the Ignalina NPP Unit 1 Decommissioning Program until year 2005. For enforcement of this program, the plan of measures for implementation of the program was prepared and approved by the Minister of Economy. The plan consists of two parts, namely technical- environmental and social-economic. Technical-environmental measures are mostly oriented to the safe management of spent nuclear fuel and operational radioactive waste stored at the plant and preparation of licensing documents for Unit 1 decommissioning. Social-economic measures are oriented to mitigate negative social and economic impact on Lithuania, inhabitants of the region, and, particularly, o n the staff of Ignalina NPP by means of creating favorable conditions for a balanced social and economic development of the region. In this paper analysis of planned activities, licensing requirements for decommissioning, progress in preparation of the Final Decommissioning Plan is discussed

  14. On the article of V. A. Mashin 'Computerized systems of NPP operators support. (Psychological problems)'

    International Nuclear Information System (INIS)

    Prushinskij, B.Ya.

    1995-01-01

    Basic aspects of V.A. Mashin's article on NPP operator support computerized systems and problems of man-machine interrelation are analyzed. Sharing in the significant degree Mashin's point of view the author of this article considers that the most important aspects of this problem consist in dividing the responsibility for NPP safe operation between all participants of the NPP creation and operation and in the area of practical experience in assuring control functions reliability

  15. International Conference of Ukrainian Nuclear Society ''NPP's safety and protection''(annotations)

    International Nuclear Information System (INIS)

    Barbashev, S.V.

    1997-01-01

    The abstracts of reports submitted to the Conference include: - New developments of the safe nuclear installations; - NPP ecological safety; - Methods of personnel and population protection; - Waste management safety (at transportation, processing and storage); - Spent nuclear fuel management; - NPP life extension and decommissioning; - Public opinion as an element of NPP safety; - Training of personnel, scientific support and safety culture; - Forecasting of nuclear power and industry safe development; - Development of international cooperation in nuclear power

  16. Programmes design for Bohunice NPP personnel other than control room operators

    International Nuclear Information System (INIS)

    Kalincik, L.

    2002-01-01

    This paper deals with project development of training programmes for non-licenced NPP personnel-masters, field operators, maintenance and technical supporting personnel. The programme development focuses on the part stage and on the job training at NPP. Bohunice NPP belongs to plants with higher specific number of personnel per installed power capacity. This factor also influenced the choice of programmes design. Undermentioned procedure is one of various approaches to SAT exploitation for training programmes design. (author)

  17. Experiences in commissioning of 1st and 2nd unit of NPP Mochovce

    International Nuclear Information System (INIS)

    Stefanovic, P.; Klucarova, K.; Cernicka, J.; Toth, L.

    2000-01-01

    Paper is focused on responsibilities and position of VUJE Trnava Inc. in process of commissioning of new NPP units. It describes the order of activities during commissioning from the preparation of measurements to evaluation of measured data. Paper's scope is on the commissioning the 1 st and 2 nd units of the NPP Mochovce, which has been commissioned in the years 1998 and 1999. Basic characteristics of the NPP Mochovce design are also included in this paper. (author)

  18. Commissioning and Operation of a Robotic Arm for Waste Retrieval at Trawsfynydd NPP, North Wales - 12091

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Alan L.; Cabrera, David L. [Magnox Ltd (United Kingdom)

    2012-07-01

    Trawsfynydd is one of the UK's first generation Magnox nuclear power plants. It started operation in 1965 and ceased generation in 1991. Before the site can enter the 'care and maintenance' phase a number of wet and dry waste stores around the site must be emptied and their contents made safe. Wet wastes include sludges and resins produced during the operating life of the NPP. The sludges and resins are stored in a number of different tanks that vary significantly in terms of size, shape, internal features and access. A dexterous long reach manipulator arm has been designed and built to facilitate tank clearance. Commissioning of the arm was carried out in parallel with Factory Acceptance Testing (FAT) at the manufacturer's site in Colorado, USA. In addition to basic functional testing this work included a full range of task based testing to ensure that the arm, tools, control system and support equipment were thoroughly exercised in representative conditions. Trawsfynydd is one of the lead sites in the UK's program for nuclear plant decommissioning. As such the lessons learned, both in terms of technology and process, will be applicable across the remainder of the fleet. (authors)

  19. Attitude of the population and students to further construction of NPP

    International Nuclear Information System (INIS)

    Machacek, Ladislav

    1993-01-01

    This presentation shows the public opinion poll young people on NPP in the Slovakia i.e. comparative research results on Attitude of the Slovak population (1991 - a sample 1104 respondents, and Slovak students 1992 - a sample 291 respondents) to the nuclear energy and NPP; Source of information about NE and NPP, motivation of apprehensions of young people concerning NE; what meaning for young people have the arguments FOR and AGAINST construction of NPP in Slovakia; whom students from Bratislava believe during discussions about NE

  20. The final report of the state scientific programme 'Ignalina NPP and the Environment'

    International Nuclear Information System (INIS)

    1998-03-01

    The final report of the State Scientific Programme 'Ignalina NPP and the Environment' includes the generalised research material on the after effects of Ignalina NPP operation upon natural environment and social processes. The data on changes of thermal state and water balance of lake Drukshiai; the effect of permanent thermal and chemical pollution on the water chemical composition and hydrochemical regime; the geochemical - contaminated state; the condition, dynamics and changes of hydrobiont communities in lake Drukshiai; the bio indication of ecological effects; the toxic and genotoxic influence of Ignalina NPP waste waters and lake Drukshiai water as well as bottom sediments; the state and dynamic of landscape ecosystem components of Ignalina NPP region; the radionuclides in Ignalina NPP area, the medical and biological studies in the Ignalina NPP influence population zone; the impact of Ignalina NPP on social territorial processes in the region are presented. Radioecological and ecotoxilogical state of Ignalina NPP region and lake Drukshiai is estimated as well as changes in lake Drukshiai and Ignalina NPP surrounding area ecosystems under the combine anthropogenic of the plant influence are elucidated. The final report contains the results of final report by the executors of the tasks and themes of the Programme which have been obtained since the beginning of the implementation of the Programme as well as generalising conclusions and recommendations. (author)

  1. NPP Multi-Biome: Global Osnabruck Data, 1937-1981, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — ABSTRACT: This data set contains three files. The first file provides net primary productivity (NPP) estimates, vegetation characteristics, and summary climate data...

  2. NPP Multi-Biome: Global IBP Woodlands Data, 1955-1975, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — ABSTRACT: This data set provides four data files containing net primary productivity (NPP) data, edaphic characteristics, average climatic conditions, and basic...

  3. NPP Multi-Biome: Global IBP Woodlands Data, 1955-1975, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides four data files containing net primary productivity (NPP) data, edaphic characteristics, average climatic conditions, and basic descriptive...

  4. Upgrading NPP personnel. Competence and training through the systematic approach to training

    International Nuclear Information System (INIS)

    Mautner Markhof, F.

    1998-01-01

    This paper presents the reasons for acceptance of SAT (Systematic Approach to Training) as the best international practice in respect to training of NPP personnel and the differences in comparison to traditional approaches to training. The identification and evaluation of the new training needs, resources and other requirements for implementing SAT are discussed as well as new approaches and existing training capabilities and involvement of Regulatory body in training of NPP personnel. The IAEA Guidebook on NPP Personnel Training (TRS-380) was used a a basis for discussion of the mentioned topics with the emphasis on achieving the best possible training programmes for NPP personnel

  5. Procedure for Application of Software Reliability Growth Models to NPP PSA

    International Nuclear Information System (INIS)

    Son, Han Seong; Kang, Hyun Gook; Chang, Seung Cheol

    2009-01-01

    As the use of software increases at nuclear power plants (NPPs), the necessity for including software reliability and/or safety into the NPP Probabilistic Safety Assessment (PSA) rises. This work proposes an application procedure of software reliability growth models (RGMs), which are most widely used to quantify software reliability, to NPP PSA. Through the proposed procedure, it can be determined if a software reliability growth model can be applied to the NPP PSA before its real application. The procedure proposed in this work is expected to be very helpful for incorporating software into NPP PSA

  6. Pilot exemption of the controlled area from regulatory control at NPP A1 -lessons learned

    International Nuclear Information System (INIS)

    Slaninka, A.; Listjak, M.; Slavik, O.; Rau, L.

    2014-01-01

    The contribution includes the lessons learned within frame of the radiological characterisation of surface ground layer in the NPP A1 site of area approximately 60 m2 (9 x 7 m) that was a part of Controlled area. Aim of the characterisation was a demonstration that the area fulfils the requirements to exemption from Controlled area for purpose of decommissioning activities carry out within frame of II. stage of NPP A1 decommissioning project.The requirements on free release of materials into the environment were applied (e.g. 300 Bq/kg for single 137 Cs). Radiological characterisation was performed by two independent methods; in situ scintillation gamma spectrometry and systematic sampling in regular grid followed by gamma spectrometry analyses in accredited laboratory of VUJE, Inc. (S-219). This improved the quality of monitoring and at the same time it enabled the inter-comparison of results obtained by both mentioned independent methods.Characterised ground area was partitioned to smaller sub-areas of 4 m2. At ground layer of 20 cm it means approximately 1000 kg of ground (in compliance with requirements on reference area at even activity distribution according to government regulation No 345/2006) The results of measurements showed that under appropriate conditions (sufficiently low radiation background, on interfering external sources) also the designed in situ method is effective and reliable tool for contaminated ground layer identification. In addition the in situ method is more effective in terms of time and cost consumption on unit of monitored area. (authors)

  7. Operational diagnostics of thermal state and efficiency of steam turbines of TPP and NPP

    Science.gov (United States)

    Bozhko, V. V.; Kovalenko, A. N.; Lyapunov, V. M.; Khomenok, L. A.

    2016-05-01

    Various ways for solving complex problems of the strength and operating life of steam turbines of TPP and NPP are studied. Diagnostic characters and technical possibilities for their control during the steam turbine operation are determined. It is shown that the effect of various factors on the reliability, maneuverability, and service life of power installations of TPP and NPP is generally determined by the thermal state of steam-electric generating sets. Leading foreign and domestic manufacturers give major attention to the organization of the control of the thermal state of facilities and the development of systems for accounting ("counter") the service life depletion. Zones of high-temperature sites of shafts and disks with maximum parameters of operating environment are determined. A model for on-line computation of thermal stresses with the diagnostic evaluation of the service life depletion (fatigue accumulation) and forecasting of optimum heating conditions for thermostressed turbine units is briefly stated. An example of a program for diagnostics of the quality of the facility operation is given. The program provides the operative control of thermal stresses and the service life depletion in main units of the turbine under various operation conditions, operates in the real-time mode, calculates and represents currents values of thermal stresses in turbine units, and forms and transmits into the industrial control signals on the occurrence of restrictions with respect to thermal stresses and prohibition of an increase or decrease in the vapor temperature and the load in the case of approaching pressures to maximum permissible ones. In the case of stationary operation conditions, the program computed the current efficiency in high (HPC) and mean (MPC) pressure cylinders.

  8. Operational and safety status of Krsko NPP

    International Nuclear Information System (INIS)

    Sirola, P.; Kavsek, D.

    1998-01-01

    Nuclear Power Plants Krsko (NEK) is producing electricity with the high level of reliability, safety and at acceptable price for 17 years. Energy is shared between both Slovenian and Croatian grid. The specifics of sharing the initial investment costs, later covering the operations costs and energy supply between Croatia and Slovenia is causing specific decision making problems about energy cost and future investments, however not influencing the plant safety, by now. NEK is continuously following the international nuclear technology practices, standards' changes and improvements and introducing them into the processes and equipment upgrades. As the member of the most important international integration, NEK is having the possibility of sharing its experience with others. Slovenian Energy Consumption and Supply Strategy is recognizing the NEK as a long term supply of energy in Slovenia being a strong decision making base for the future. According to the above mentioned Slovenian Energy Consumption and Supply Strategy the plant is obliged to keep all the radioactive waste, produced during the plant life, on site. The extensive efforts are taking place to reduce the radioactive waste production and save the area available for temporary waste deposition. The plant is licensed for the period of 40 years of commercial operation which started in 1983, so the Life Time Management is getting more and more important, including the performance tracing of the essential components, their maintenance and surveillance programs and also replacement plans of critical equipment. The major problems the NEK is confronted with at the moment are the Steam Generators which are reaching their and of life, and a very limited radioactive waste storage area. They are excerting influence on the plant availability and operations and maintenance costs. At the moment the process of Modernization is in progress, covering the Steam Generators replacement and a Plant Specific Simulators supply

  9. Study of environmental impact assessment for Mochovce NPP Units 3 and 4. Executive summary. September 2007

    International Nuclear Information System (INIS)

    Anon

    2007-09-01

    SE/ENEL, on a voluntary basis, has prepared new EIA Study for the completion of Units 3 and 4 of Mochovce Nuclear Power Plant (MO34 NPP) according to International current practices and European Directives. The results of the analysis, according to SE/ENEL Environment and Corporate Social Responsibility policies, will be provided to local Communities and Public Authorities. The Environmental Impact Assessment is performed: - in compliance with appendix 11 of Slovak Act. No. 24/2006 'On the assessment of the effects on the environment and on the modification and enlargement of some laws'; - meeting the requirements of the Exhibit II 'Illustrative list of potential social and environmental issues to be addressed in the Social and Environmental Assessment documentation' as reported in the document 'Equator Principles' of 2006 July developed by the International Finance Corporation (IFC). The area of Mochovce NPP is situated in Central Europe in the south-western region of the Slovak Republic (SR) at the western border of the Levice district. The area lies in the south-western part of the Kozmalovske hills mainly in the Hron highlands. From the point of view of the terrestrial and administrative organization of the SR, Mochovce NPP is situated in the eastern part of the Nitra region, in the north-western part of the Levice district, close to the border with the Nitra and Zlate Moravce districts. Mochovce NPP is approx. 12 km from the district capital Levice, which is the largest town within a 20 km distance from the power plant. Initial site preparation began in August 1983. In April 1998 the first fuel was loaded into Unit 1 of Mochovce NPP. The operation started in August 1998. Unit 2 started operation in January 2000. The original Construction Permit No. Vyst. 2010/86 for MO 34 was issued by the District National Committee in Levice on the basis of the Land Planning Decisions on 12 November 1986. This Permit has been renewed firstly on 5 May 1997 by letter of the

  10. Seismic assessment of a site using the time series method

    International Nuclear Information System (INIS)

    Krutzik, N.J.; Rotaru, I.; Bobei, M.; Mingiuc, C.; Serban, V.; Androne, M.

    1997-01-01

    To increase the safety of a NPP located on a seismic site, the seismic acceleration level to which the NPP should be qualified must be as representative as possible for that site, with a conservative degree of safety but not too exaggerated. The consideration of the seismic events affecting the site as independent events and the use of statistic methods to define some safety levels with very low annual occurrence probability (10 -4 ) may lead to some exaggerations of the seismic safety level. The use of some very high value for the seismic acceleration imposed by the seismic safety levels required by the hazard analysis may lead to very costly technical solutions that can make the plant operation more difficult and increase maintenance costs. The considerations of seismic events as a time series with dependence among the events produced, may lead to a more representative assessment of a NPP site seismic activity and consequently to a prognosis on the seismic level values to which the NPP would be ensured throughout its life-span. That prognosis should consider the actual seismic activity (including small earthquakes in real time) of the focuses that affect the plant site. The paper proposes the applications of Autoregressive Time Series to issue a prognosis on the seismic activity of a focus and presents the analysis on Vrancea focus that affects NPP Cernavoda site, by this method. The paper also presents the manner to analyse the focus activity as per the new approach and it assesses the maximum seismic acceleration that may affect NPP Cernavoda throughout its life-span (∼ 30 years). Development and applications of new mathematical analysis method, both for long - and short - time intervals, may lead to important contributions in the process of foretelling the seismic events in the future. (authors)

  11. On the Matter of NPP New Builds

    International Nuclear Information System (INIS)

    Stosic, Z. V.

    2010-01-01

    decision making process, performing feasibility studies, checking timeline and analyzing challenges including effects on economy; (ii) New Build Construction - giving the context, major achievements and general site work status.(author).

  12. NPP/VIIRS Atmospherically Corrected Surface Reflectance 6-Min L2 Swath 375m, 750m NRT

    Data.gov (United States)

    National Aeronautics and Space Administration — The VNP09_NRT is a Near Real Time (NRT) S-NPP/VIIRS 375 m, 750 m Atmospherically Corrected Surface Reflectance product. The NPP/VIIRS surface reflectance products...

  13. Document turn-over analysis to determine need of NPP construction in build-up structures of reinforced concrete

    International Nuclear Information System (INIS)

    Vojpe, D.K.; Lyubavin, V.K.

    1986-01-01

    Document turn-over to determine used of NPP construction in build-up structures of reinforced concrete is carried out. Ways of improving determination of needs of NPP construction board in the mentioned structures are pointed out

  14. Training in fundamentals of radiological coverage in Laguna Verde NPP

    International Nuclear Information System (INIS)

    Lara H, M. A.

    2014-10-01

    In 2010, the Institute of Nuclear Power Operations (INPO) celebrates the Knowledge Transfer and Retention Workshop, an event where nuclear regulators and operators presented the strategies that various NPP to worldwide were implemented to mitigate the consequences of this generational change and take advantage of it, the trend in the presented works was the same: the generational change occurs in a faster way that the transfer of knowledge, the future was already here and many NPP had not been adequately prepared to train its nuclear technicians and engineers in the tasks demanded by the industry of them, so in addition to preparing these workers to forced marches was necessary to establish strategies to retain at more experienced staff in the industry. The Laguna Verde NPP has not been exempt to this process; the preparation of personnel squares to replace those that reaching retirement age in the Comision Federal de Electricidad (CFE) has become extensive in the last five years, sometimes leading to have personnel covering functions without an alternate to the next lower position, the cause? Not enough staff. In the specific case of radiation protection (Rp) the time required for obtaining the status of Rp technician according to the ANSI/ANS 3.1 standard is 2 years, one of the tasks that most occupies part of these two years is training in radiological coverage, this training requires a mix of knowledge and experience, recently one of the concepts used for training in Rp is the evaluation and management of the radiological risk, topic that is considered in this technical work. (Author)

  15. Improvement Methods in NPP's Radiation Emergency Plan: An Administrative Approach

    International Nuclear Information System (INIS)

    Lee, Yoon Wook; Yang, He Sun

    2009-01-01

    The Radiation Emergency Plan (REP) can be divided into a technical and an administrative responses. The domestic NPP's REPs are reviewed from the viewpoint of the administrative response and improvement methods are also suggested in this treatise. The fields of the reviews are the composition of the emergency response organizations, the activation criteria of the organizations, the selection of the staffings and the reasonableness of the REP's volume. In addition, the limitations of the current radiation exercises are reviewed and the improvement method of the exercise is presented. It is expected that the suggested recommendations will be helpful in establishing useful REPs and making practical radiation exercises in Korea

  16. Startup physics tests at Temelin NPP, Unit 1

    International Nuclear Information System (INIS)

    Sedlacek, M.; Minarcin, M.; Toth, L.; Elko, M.; Hascik, R.

    2002-01-01

    The objective, scope and proceedings of the physics tests of Temelin NPP, Unit 1 physical commissioning are given in this paper. Furthermore, some results of selected physics tests are presented: reactor initial criticality test, determination of reactor power range for physics testing, measurement of control rod cluster assembly group no. 10 reactivity worth in case of limitation system LS(a) actuation, control rod cluster assembly system reactivity worth measurement with single rod cluster assembly of greatest reactivity worth stuck in fully withdrawn position, measurement of differential reactivity worth of control rod cluster assembly group no. 9, boron 'endpoint' determination and measurement of power reactivity coefficient (Authors)

  17. Solid radioactive waste processing facility of the NPP Leningrad

    International Nuclear Information System (INIS)

    Weichard, Swetlana

    2008-01-01

    On behalf of the Russian Company Rosenergoatom NUKEM Technologies GmbH is planning and constructing a complete facility for the processing of solid low- and medium-active radioactive wastes. The NPP Leningrad comprises 4 units of RBMK-1000 reactors, the plant life has been extended by 15 years, the first unit is to be decommissioned in 2018. The construction of four new units is planned. NUKEM is in charge of planning, manufacture, construction and startup of the following facilities: sorting, internal transport, combustion and waste gas cleaning, emission surveillance, compacting, packaging and radiological measurement.

  18. R and D status for NPP life management in Korea

    International Nuclear Information System (INIS)

    Kim, Tae Ryong

    2009-01-01

    The economical benefits may be achieved by the plant life management (PLiM) as well as structural integrity of the critical components of NPP. Systems, structures and components (SSC) of NPP are designed to have safety margins in design stage, and being operated with operational margins. As the plant gets older and older, however, aging of SSC occurs and some of SSC may be sometimes failed due to the unexpected aging mechanisms in design stage. Most countries which have operated NPP have their own R and D programs to establish proper countermeasures against the aging and degradation of SSC, The well known program are materials reliability program (MRP) and steam generator management program (SGMP) of EPRI. In Korea, we also have our own R and D programs for the plant life management. In this paper, the present status of the R and D programs will be introduced. Long term operation of a nuclear power plant is one of the goals that the plant wants to achieve, which may be possible as long as the plant safety is maintained and the economical benefits is expected. The economical benefits may be achieved by the plant life management (PLiM) activities. Many R and D activities related to PLiM have been carried out and implemented to Korean NPP, Kori Unit 1 and Wolsong Unit 1 in particular, for the long term operation beyond their original design lives. Those activities include PLiM study, PSR, SGMP, MRP, thinned pipe management program, study on dissimilar metal welds, aging monitor etc. With the results of R and D activities, continued operation of Kori Unit 1 was successfully started from January 17, 2008 for next 10 years beyond its design life. It must be a landmark of 30 years history of nuclear power generation in Korea. Subsequently Wolsong Unit 1 is also expected to start its continued operation when the replacement of pressure tubes and feeders are completed in 2009. Many countries have plans to build new reactors or to extend the life of operating plants.

  19. The contemporary radioecological condition of Chernobyl NPP cooling pond

    International Nuclear Information System (INIS)

    Zarubin, O.L.; Shatrova, N.E.; Zalisskij, A.A.; Derevets, V.V.; Nazarov, A.B.

    2001-01-01

    In 1999 the condition of the Chernobyl NPP cooling pond's ecosystem was studied. The data of 13 7Cs content in organs and tissues of different kinds of fish are presented. The change of 137 Cs content correlation in different kinds of fish is shown in comparison with the data received earlier. The season dynamic of 137 Cs content in fish's tissues was noted. The differences of 137 Cs content in the fish according to the point where the samples were collected are shown

  20. A risk informed safety classification for a Nordic NPP

    International Nuclear Information System (INIS)

    Jaenkaelae, K.

    2002-01-01

    The report describes a study to develop a safety classification proposal or classi- fication recommendations based on risks for selected equipment of a nuclear power plant. The application plant in this work is Loviisa NPP unit 1. The safety classification proposals are to be considered as an exercise in this pilot study and do not necessarily represent final proposals in a real situation. Comparisons to original safety classifications and technical specifications were made. The study concludes that it is possible to change safety classes or safety signifi- cances as considered in technical specifications and in in-service-inspections into both directions without endangering the safety or even by improving the safety. (au)

  1. Application of ant colony optimization in NPP classification fault location

    International Nuclear Information System (INIS)

    Xie Chunli; Liu Yongkuo; Xia Hong

    2009-01-01

    Nuclear Power Plant is a highly complex structural system with high safety requirements. Fault location appears to be particularly important to enhance its safety. Ant Colony Optimization is a new type of optimization algorithm, which is used in the fault location and classification of nuclear power plants in this paper. Taking the main coolant system of the first loop as the study object, using VB6.0 programming technology, the NPP fault location system is designed, and is tested against the related data in the literature. Test results show that the ant colony optimization can be used in the accurate classification fault location in the nuclear power plants. (authors)

  2. Waste management concept during dismantling of KKS NPP in Germany

    International Nuclear Information System (INIS)

    Bacmeister, Georg U.

    2008-01-01

    Full text: This paper gives an overview on the waste management of NPP Stade during dismantling. The general idea is to reduce the radioactive waste to about three percentage of the complete dismantling mass. The NPP Stade in Germany was shut down in November 2003. After a transient phase the license for dismantling was given in 2005. In the following 8 years about 20.000 tones of steel and 120.000 tones of concrete will be put out by the dismantling. The yearly output of steel will by about 100 times higher than during the running time of the NNP. For this a new processes for waste management had to be installed. The waste management during dismantling focus on free release (about 97%). Beside some minor exception, the rest is deemed to be radioactive waste. This will be collected in 1000 packages, which are ready to be sent to a final storage. As until now in Germany no final storage is open (and sending of radioactive waste to another country is forbidden), the NNP Stade build an intermediate storage, where the packages may by saved for longest 40 years. The clearance procedure in Germany is regulated in the radiation protection ordinances. It is based on a nuclide specific set of clearance levels. To fulfil these demands the NNP Stade chose a semi automated system for characterization and documentation, which we develop in accordance to our release license. It guaranties a most accurate determination of the relevant nuclides for a set of dismantling material (some 10 to 100 tones). After the characterization only the gamma-activity of the material is measured in boxes of about 500 kg. A short comparison of the chosen procedure with other options, possible in Germany will be given and the decision from the collaboration with the NPP in Barsebaeck, Sweden, will be withdrawn. Beside the free release different options are used for waste management, like incineration, sending to landfill or reuse in nuclear industry. The waste management of the NNP Stade take

  3. Problems of improving the investing process management in NPP construction

    International Nuclear Information System (INIS)

    Denisov, G.A.

    1986-01-01

    Problems of development of the optimal system for the investing process management in NPP construction are discussed. It includes 3 steps: design construction ( including building structure and equipment production ), and achievement of designed technical and economical indices, during reactor start-up. The method for estimating the interest of each participator of the intensing process and developing the optimal solution, that is capable to approach these interests, is suggested. The conclusion is made that it is necessary to develop and confirm the branch standard, which should include a complex amalgamated network of works to improve the organization of the investing process

  4. Modelling the impact of Cernavoda NPP on the environment

    International Nuclear Information System (INIS)

    Constantin, A.-I.

    2001-01-01

    In connection with a stay as a visiting researcher at VTT Energy (Technical Research Center of Finland), a study was conducted related to the atmospheric dispersion and dose assessment for radioactive releases from nuclear power plants. The most important aspects of this study are described in this paper. These include: the application of the TRADOS dispersion and dose assessment model in the case of the Cernavoda NPP and the development of a special program INTEGRATION for the calculation of cloud gamma dose rate of 72 nuclides. (authors)

  5. IAEA activities on safety aspects of NPP ageing

    International Nuclear Information System (INIS)

    Pachner, J.

    1998-01-01

    A review of IAEA activities concerned with safety aspects of nuclear power plants ageing is given for the period from 1995 to 1998 with the prospects till year 2000. Coordinated Research programs were conducted on Management Ageing of Concrete Containment Buildings; Management of Ageing of In-Containment I and C cables. TECDOCs were published on Assessment and Management of Ageing of Major NPP Components Important for Safety of CANDU, PWR and BWR NPPs. Technical Committee Meetings and Interregional training courses concerned with the same subjects were held

  6. Ecological and environmental education in the region of Ignalina NPP

    International Nuclear Information System (INIS)

    Motiejuniene, E.; Salickaite-Bunikiene, L.

    1995-01-01

    During three last years the groups involving pupils, students and teachers take part in the educational sessions. They are organized in Drukshiai Ecological Station . The work of Ignalina NPP, its influence on the nature as well as methods and results of scientific investigation and assessment of the influence are discussed. To direct environmental research activity of scholars the special 3-8 days programs made up by researchers are used. They include theoretical and practical studies. Educational - research activity performed in the Drukshiai Ecological Station could be an example of ecological schooling center related to environmental protection. (author). 2 refs

  7. Policy and methodology on NPP lifetime management in Spain

    International Nuclear Information System (INIS)

    Francia, L.

    1998-01-01

    The objectives for Spanish electricity sector are to extend the life cycle of NPPs beyond 40 years, maintaining safety and efficiency level, and to monitor and control ageing of important components to guarantee the prolonged lifetime. A plan for plant life management including licensing and regulatory aspects is proposed together with the methodology for achieving the proposed goals. The expected results are: life management integrated system for follow-up and monitoring of degradation and ageing mechanisms of important NPP components; modular system which will enable incorporation of additional components, degradation and/or performances; interrelation and support tool for other needs of NPPs (periodic safety reviews, maintenance, optimization, etc.)

  8. Radioactive waste management after NPP accident: Post-Chernobyl experience

    International Nuclear Information System (INIS)

    Mikhalevich, A.; Grebenkov, A.

    2000-01-01

    As a result of the Chernobyl NPP accident a very large amount of so-called 'Chernobyl waste' were generated in the territory of Belarus, which was contaminated much more than all other countries. These wastes relate mainly to two following categories: low-level waste (LLW) and new one 'Conventionally Radioactive Waste' (CRW). Neither regulations nor technology and equipment were sufficiently developed for such an amount and kind of waste before the accident. It required proper decisions in respect of regulations, treatment, transportation, disposal of waste, etc. (author)

  9. NPP accident scenario. Which emergency measures are planned in Switzerland?

    International Nuclear Information System (INIS)

    Flury, Christoph

    2016-01-01

    As a consequence of the reactor accident in Fukushima the Swiss government has ordered an extensive analysis of emergency planning in case of a NPP accident Switzerland. A special working group has analyzed the possible improvements of Swiss emergency planning based on the experiences in Japan. Under the special direction of the Bundesamt fuer Bevoelkerungsschutz (BABS) the agreed improvements were integrated into the emergency concept. The reference scenarios have been re-assessed and the zone concept adapted. The emergency measures include shelter-type rooms (basement or window-less rooms), the preventive distribution of iodine pills, measures concerning agriculture, aquatic systems, preventive evacuation, traffic regulations, and delayed evacuation.

  10. On-line chemical monitors in EDF NPP

    International Nuclear Information System (INIS)

    Doyen, J.

    1994-01-01

    Most corrosion that occurs in the circuits of a NPP is due: - either to inadequate conditioning; ammonia or morpholine levels are too low, sometimes too high, hydrazine level is too low compared to the air ingress levels, or -to the pollution of the water; for instance, sodium coming from the make-up water demineralization system or cooling water ingress, and oxygen coming from the air ingress to the condenser. At EDF, chemistry is mainly ensured by automatic on-line monitors (pH, conductivity, sodium, oxygen) rather than by extensive sampling and manual analyses. (author). 1 tab., 3 refs

  11. The demographic cequence of the Chernobyl' NPP accident

    International Nuclear Information System (INIS)

    Fashchevskij, N.I.; Palij, T.M.; Starostenko, A.G.; Nemchenko, M.P.

    1992-01-01

    In 1990 the total population evacuated due to the ChNPP accident was questionared. The analysis of the data obtained became the initial base for the demographic characteristics of this population. In 1991 about 40.000 people were planned to move. The estimation of the age of the moved, their marital status makes it possible to prognose their social child-bearing and economic value for the places where they were moved. In 1991 it was supposed that not only the moved population might have given birth to regenerations the necessary rate but also their mortality might play a significant role in the increase of the death rate

  12. Improving efficiency of NPP software based I and C

    International Nuclear Information System (INIS)

    Ukhina, A.V.; Bilenko, A.A.; Sitnikov, V.S.

    2016-01-01

    The paper considers improving efficiency of NPP software based I and C during adjustment and readjustment of its characteristics. The research analyzes impact of transfer function coefficient of digital components on features of frequency - response characteristics, which shall be considered during design of software based I and C. The paper objective was to determine the numerator and denominator dependencies of transfer function of first order high - pass and low - pass digital filters of cut - off frequency, and also to determine dependencies on pulsation coefficient

  13. Automatic technological control system of the Kolsk NPP Unit-1

    International Nuclear Information System (INIS)

    Volkov, A.P.; Dolgov, A.S.; Zinov'ev, S.V.; Ignatenko, E.I.; Katasonov, Yu.P.; Kolomtsev, Yu.V.; Mel'nikov, E.F.; Reznik, V.R.; Trofimov, B.A.

    1981-01-01

    Reconstruction of the present centralized control system with application of a new small SM2-9 computer and reactor control system ''Jailyk'' is started at the Kolsk NPP (KNPP). Presented are the flowsheet of the technological process automatic control system (TRACS) of the KNPP first generation after reconstruction, by stage diagram conducting organizational-technical measures on the TP ACS reconstruction and communication flowsheet of the IV-500 MA information subsystem with the SM2-9 computer. The TP ACS reconstruction will make it possible to obtain the unit power up to 115% from the nominal one [ru

  14. Survey of Water Chemistry and Corrosion of NPP

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Ki Sok; Hong, Bong Geon

    2008-06-15

    Status of water chemistry of nuclear power plant and materials corrosion has been surveyed. For PWR, system chemistry of primary coolant and secondary coolant as well as the related corrosion of materials was surveyed. For BWR, system chemistry as whole has been surveyed with its accompanying corrosion problems. Radiolysis of coolant water and activation of corrosion products also was surveyed. Future NPP such as supercritical water cooled reactor and fusion reactor has also been surveyed for their water chemistry and corrosion problems. As a result, proposal for some research items has been suggested. Some related corrosion research techniques and electrochemical fundamentals are also presented.

  15. Effect of radioactive contamination of hydrobionts within the thirty-kilometer zone of Chernobylsk NPP

    International Nuclear Information System (INIS)

    Ryabov, I.N.

    1992-01-01

    A study was made of hydrobionts, particularly fishes, living within the thirty-kilometer control zone of Chernobyl NPP and northern part of the Kiev basin, after the disaster. Out of 31 fish species living in the NPP cooling pond some were idendified which were mostly affected by radioactive contamination. They were predators belonging, with respect to reproduction and development, to a lithophilous group

  16. Nonvascular contribution to ecosystem NPP in a subarctic heath during early and late growing season

    DEFF Research Database (Denmark)

    Campioli, Matteo; Samson, Roeland; Michelsen, Anders

    2009-01-01

    Bryophytes and lichens abound in many arctic ecosystems and can contribute substantially to the ecosystem net primary production (NPP). Because of their growth seasonality and their potential for growth out of the growing season peak, bryophyte and lichen contribution to NPP may be particularly...

  17. Principles of Defense-in-depth philosophy applied in NPP engineering management

    International Nuclear Information System (INIS)

    Wu Guangwei

    2011-01-01

    Based on the Defense-in-depth Concept in nuclear and radiation safety, Defense-in-depth Concept for design management of Nuclear Power Plant (NPP) is developed in this paper to analyze the feasibility and importance of the application of the basic principle: Defense-in-depth concept in NPP systems performed during the design control of NPP. This paper focuses on the NPP engineering management process, and according to the analysis of such process, 5 principles of Defense-in-depth Concept applied in NPP design management are raised: (1) preventing the non-conformities of design via effective design quality management system; (2) discovering and correcting non-conformities of design quality in time via design checkup and design review meeting; (3) carrying out timely analysis and treatment against design non-conformities which have been transferred to construction phase; (4) Assessing and judging the severe non-conformities in construction phase, putting forward treatment opinions and remedies accordingly so as to avoid the existence of such non-conformities in physical construction of NPP; (5) Paying 'return-visit' and performing 'post-assessment' for NPP design to assess the designed functions and safety of NPP comprehensively. (author)

  18. Variations and trends of terrestrial NPP and its relation to climate ...

    Indian Academy of Sciences (India)

    Considering global climate change, near surface temperature is the major factor affecting the terrestrial ecosystem, followed by the precipitation. This means terrestrial ecosystem NPP is more closely related to near surface temperature than precipitation. Between 1976 and 2005, NPP shows an obvious increasing temporal ...

  19. The ratio of NPP to GPP: evidence of change over the course of stand development

    Science.gov (United States)

    Annikki Makela; Harry T. Valentine

    2001-01-01

    Using Scots pine (Pinus sylvestris L.) in Fenno-Scandia as a case study, we investigate whether net primary production (NPP) and maintenance respiration are constant fractions of gross primary production (GPP) as even-aged mono-specific stands progress from initiation to old age. A model of the ratio of NPP to GPP is developed based on (1) the...

  20. Variations and trends of terrestrial NPP and its relation to climate

    Indian Academy of Sciences (India)

    Considering global climate change, near surface temperature is the major factor affecting the terrestrial ecosystem, followed by the precipitation. This means terrestrial ecosystem NPP is more closely related to near surface temperature than precipitation. Between 1976 and 2005, NPP shows an obvious increasing temporal ...

  1. Experience of Hungarian model project: 'Strengthening training for operational safety at Paks NPP'

    International Nuclear Information System (INIS)

    Kiss, I.

    1998-01-01

    Training of Operational Safety at Paks NPP is described including all the features of the project including namely: description of Paks NPP, its properties and performances; reasons for establishing Hungarian Model Project, its main goals, mentioning Hungarian and IAEA experts involved in the Project, its organization, operation, budget, current status together with its short term and long term impact

  2. Site Response Analysis Using DeepSoil: Case Study of Bangka Site, Indonesia

    Energy Technology Data Exchange (ETDEWEB)

    Iswanto, Eko Rudi; Yee, Eric [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-10-15

    Indonesia government declared through Act No. 17 year 2007 on the National Long-Term Development Plant Year 2005-2025 and Presidential Decree No. 5 year 2006 on the National Energy Policy (Indonesia 2007; Indonesia 2006), that nuclear energy is stated as a part of the national energy system. In order to undertake the above national policy, National Nuclear Energy Agency of Indonesia, as the promotor for the utilization of nuclear energy will conduct site study, which is a part of infrastructure preparation for NPP construction. Thorough preparation and steps are needed to operate an NPP and it takes between 10 to 15 years from the preliminary study (site selection, financial study, etc.) up to project implementation (manufacturing, construction, commissioning). During project implementation, it is necessary to prepare various documents relevant for permit application such as Safety Evaluation Report for site permit, Preliminary Safety Analysis Report and Environment Impact Assessment Report for construction permit. Considering the continuously increasing electricity energy demand, it is necessary to prepare for alternative NPP sites. The safety requirements of NPP's are stringent; amongst the various requirements is the ability to safely shut down in the wake of a possible earthquake. Ground response analysis of a potential site therefore needs to be carried out, parameter that affect the resistance of an NPP to earthquakes such as peak strain profiles is analysed. The objective of this paper is to analyse the ground response of the selected site for a NPP, using The Mw 7.9 in Sikuai Island, West Sumatra on September 12, 2007 as present input motion. This analysis will be carried out using a ground response analysis program, DeepSoil. In addition to this, an attempt was made to define the site specific input motion characteristics of the selected site for use in DeepSoil (DeepSoil 5.0). A site investigation at the WB site was performed primarily on the PS

  3. OMPS-NPP L2 NM Sulfur Dioxide (SO2) Total and Tropospheric Column swath orbital V2 (OMPS_NPP_NMSO2_L2) at GES DISC

    Data.gov (United States)

    National Aeronautics and Space Administration — The OMPS-NPP L2 NM Sulfur Dioxide (SO2) Total and Tropospheric Column swath orbital collection 2 version 2.0 product contains the retrieved sulfur dioxide (SO2)...

  4. OMPS-NPP L2 NM Nitrogen Dioxide (NO2) Total and Tropospheric Column swath orbital V2 (OMPS_NPP_NMNO2_L2) at GES DISC

    Data.gov (United States)

    National Aeronautics and Space Administration — The OMPS-NPP L2 NM Nitrogen Dioxide (NO2) Total and Tropospheric Column swath orbital collection 2 version 2.0 product contains the retrieved nitrogen dioxide (NO2)...

  5. Actual status of project Mochovce NPP units 3 and 4 completion

    International Nuclear Information System (INIS)

    Niznan, S.

    2005-01-01

    In this presentation author deals with actual status of project Mochovce NPP units 3 and 4 completion. Present state of Mochovce NPP, Units 3 and 4 enables real assumption to completion. It is expected that such supplier companies can be used which are experienced in field of nuclear projects. Based on budget of 2002, it seems that completion costs of 45 billions SKK are real. These figures were confirmed by study performed by TRACTEBEL in 2004. Based on experience from Bohunice NPP completion as well as from Mochovce NPP, Units 1 and 2 completion and if decision milestone and project start up deadlines will be observed according to modified preliminary schedule of Mochovce NPP Units 3 and 4 completion, it seems as real that Unit 3 will be completed till 06/2011 and Unit 4 - till 12/2011.

  6. Perspectives for utilization of the experience from the electrical equipment modernization of Kozloduy NPP units 5 and 6 in case of construction of new NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2005-01-01

    In 2005 a governmental decision for continue the project for construction of Belene NPP was adopted. In case of start of this significant project in short terms, a good option will be to utilize the already achieved experience by the modernization program of units 5 and 6 of Kozloduy NPP. The process of construction of new NPP is associated with significant amount of engineering, civil construction works, equipment order and delivery, installation works, testing and commissioning activities. It is vital necessity to have optimal technology, strict organization for project implementation and excellent documentation. From technical point of view the experience from the modernization of units 5 and 6 of Kozloduy NPP will be very important in case of utilization of similar types of WWER 1000 units. According to the 'Feasibility study for construction of Belene NPP', the most favorable option is to accomplish the already partially constructed Unit 1 on the basis of upgraded WWER B-320 design - WWER 1000 B-392, in order to fulfill IEC 331-3A, IEC 332-3A, and of US NRC Regulatory Guide 1.70 and to construct the second unit on the basis of ASE WWER/1000 B-466. However, for any type of unit selected, the achieved experience will be an important basis. This article is focused mostly on the modernization aspects of some electrical systems of Kozloduy NPP

  7. Soil-structural interaction analysis of RBMK type NPP for seismic event. Progress report. From 1 July 1998 - 30 June 1999

    International Nuclear Information System (INIS)

    1999-01-01

    The objective of the project is to assess the structural behavior and safety capacity of a RBMK-1000 MW Main Building Complex under critical combination of loads including seismic events. This project is part of the Coordinated Research Program carried out by International Atomic Energy Agency on safety of RBMK Type Nuclear Power Plants (NPP) in Relation to External Events. The nuclear power plant considered for this study is the Sosnovy Bor NPP, located near St.Petersburg, Russia. The Soviet standard design RBMK-1000 MW type units installed in Sosnovy Bor NPP were originally designed for a Safe Shutdown Earthquake (SSE) with a peak ground acceleration (PGA) of 0.1 g. The relevant response spectra are not available for reference and assessment. The new international requirements for nuclear power plants in operation require site specific seismic hazard studies as a basis for the definition of a Review Level Earthquake (RLE) for reassessment of the structures and safety related equipment Ell - As the RLE site specific seismic data is still not available, the RLE earthquake spectra for Kozloduy NPP scaled to PGA=0.1 g were used in this study. This value is intentionally chosen for comparison purposes. The Russian design requirements (if design floor response spectra are available) will be compared with the international regulations. The scope of the study is to perform a Soil-Structure Interaction (SSI) seismic response analysis of the referenced RBMK-11000 MW. Main Building Complex to evaluate the effect on the structural response of a greater than design earthquake. The analysis is focused on a realistic assessment of the structural response to a potentially higher earthquake level instead of a conservative design type analysis. Special attention is paid on the seismic response of the sub-structures in the safe shutdown path, as well as on the locations of the heavy equipment

  8. Improvement of coal focus and cooling towers of COFRENTES NPP

    International Nuclear Information System (INIS)

    Martinez, I.; Bogh, P.

    1998-01-01

    Cofrentes Nuclear Power Plant is performing a improving program of its cooling towers based on the filling revamping and cooling water circuit improvement. Furthermore, and as consequence of the acquired experience on cooling towers due to the mentioned program, Cofrentes NPP has decided to follow up with this project from a different point of view based on the thermal-hydraulic optimization of the cooling process inside the towers. This program, which is going to be carried out by Cofrentes NPP, Iberinco and Energy Planning and Power Generation (EPPG) provides an improvement on the thermal profile and of the draught inside the cooling towers by improving the water distribution in the towers active area. In order to perform such a program is needed to fulfill a test program to assure a guaranteed performance gain. In this way, Iberinco is developing a test procedure which improves the results which are obtained with the present standards used commonly by the industry. As a consequence of this program, Cofrentes is expecting to obtain a gain of 5 to 8 MWe with a revenue period of 4 to 5 months, results validated in another foreigner Plant which have developed a similar program. (Author)

  9. New excitation equipment for 220 MW generators in Kozloduy NPP

    International Nuclear Information System (INIS)

    Tomerlin, D.

    2001-01-01

    Rehabilitation on the excitation equipment for Generator 5, Reactor Unit 3, in Kozloduy NPP was completed in November 2000. ABB's Static Excitation System based on UNITROL 5000 technology has been chosen by the Bulgarian National Utility and Kozloduy NPP to substitute the original Russian excitation system equipment with electro-magnetic voltage regulators. The substitution is in a rehabilitation package of four excitation system equipment for Generator 5 and 6 of Reactor Unit 3 and Generator 7 and 8 of Reactor Unit 4 after a short overview of the original excitation system this paper describes the new Static Excitation System UNITROL 5000 including configuration with block diagram, its main features and merits such as modes of operation, limiter, special control functions and diagnostic facilities. Furthermore, new facilities, which are implemented in UNITROL 5000, such as dynamic current distribution among the thyristors working in parallel as well as the start-up from the residual magnetism are mentioned. Special functions including a so-called free-running mode of operation and automatic change over sequence from new excitation system to the stand-by excitation system, which is DC exciter machine, are described. Some records of the transient responses performed during the commissioning and a photograph of a manufactured system are provided. (author)

  10. Surface Passivation Studies on n+pp+ Bifacial Solar Cell

    Directory of Open Access Journals (Sweden)

    Suhaila Sepeai

    2012-01-01

    Full Text Available Bifacial solar cell is a specially designed solar cell for the production of electricity from both sides of the solar cell. It is an active field of research to make photovoltaics (PV more competitive by increasing its efficiency and lowering its costs. We developed an n+pp+ structure for the bifacial solar cell. The fabrication used phosphorus-oxy-trichloride (POCl3 diffusion to form the emitter and Al diffusion using conventional screen printing to produce the back surface field (BSF. The n+pp+ bifacial solar cell was a sandwiched structure of antireflective coatings on both sides, Argentum (Ag as a front contact and Argentum/Aluminum (Ag/Al as a back contact. This paper reports the solar cell performance with different surface passivation or antireflecting coatings (ARC. Silicon nitride (SiN deposited by Plasma-Enhanced Chemical Vapor Deposition (PECVD, thermally grown silicon dioxide (SiO2, PECVD-SiO2, and SiO2/SiN stack were used as ARC. The efficiency obtained for the best bifacial solar cell having SiN as the ARC is 8.32% for front surface illumination and 3.21% for back surface illumination.

  11. Evaluation of the safety margins during shutdown for NPP Krsko

    International Nuclear Information System (INIS)

    Bencik, V.; Sadek, S.; Bajs, T.

    2004-01-01

    In the paper the results of RELAP5/mod3.3 calculations of critical parameters during shutdown for NPP Krsko are presented. Conservative evaluations have been performed at NPP Krsko to determine the minimum configuration of systems required for the safe shutdown operation. Critical parameters in these evaluations are defined as the time to start of the boiling and the time of the core dry-out. In order to have better insight into the available margins, the best estimate code RELAP5/mod3.3 has been used to calculate the same parameters. The analyzed transient is the loss of the Residual Heat Removal (RHR) system, which is used to remove decay heat during shutdown conditions. Several configurations that include open and closed Reactor Coolant System (RCS) were considered in the evaluation. The RELAP5/mod3.3 analysis of the loss of the RHR system has been performed for the following cases: 1) RCS closed and water solid, 2) RCS closed and partially drained, 3) Pressurizer manway open, Steam Generator (SG) U tubes partially drained, 4) Pressurizer and SG manways open, SG U tubes completely drained, 5) Pressurizer manway open, SGs drained, SG nozzle dams installed and 6) SG nozzle dams installed, pressurizer manway open, 1 inch break at RHR pump discharge in the loop with pressurizer. Both RHR trains were assumed in operation prior to start of the transient. The maximum average steady state temperature for all analyzed cases was limited to 333 K. (author)

  12. Engineering Center contribution to the Russian NPP aging management

    International Nuclear Information System (INIS)

    Bougaenko, S.

    1993-01-01

    The Engineering Center of strength, reliability and life of the nuclear equipment of the Minatom, Russia, has been set up by the decision of the management of the Russian Federation Ministry on the nuclear power (Russia Minatom) within the framework of the Research and Development Institute of Power Engineering (RDIPE). The Engineering Center is responsible for fulfilling the functions of the leading Institution of the Ministry concerning these issues and it is in charge of the development of the appropriate rules and standards package as well as their compliance with analogous international regulating documents. To put forward the national program on NPP aging management, and to implement it is one of the crucial tasks of the Engineering Center. This activity is conducted by both the cooperation between Russian Institution and experts and within the framework of the international collaboration. In the latter case it is worthy of noting the activity with respect to the American-Russian Working Group 12 ''NPP Aging and Life Extension'' and participation in appropriate programs of the IAEA. The major trends of the above activity are considered in this paper

  13. Development of NPP Monitoring and Operation Support Technology

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Park, Jae Chang; Lee, Yong Hee [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)] (and others)

    2008-04-15

    During the first stage (2001.7.1-2004.6.30), we developed general human factors design guidelines VDU-based workstations, PMAS alarm display design guidelines, PMAS SPADES display design guidelines, and the revision of KHNP HFE guidelines (HF-010), which have been applied to domestic NPP designs. We also supported other KNICS projects by performing RPS COM design reviews, development of RPS COM Style Guide, and a review of CEDMCS cabinet operator module display design. We developed the ADIOS prototype, NPP performance analysis systems for YGN No.1, 2 plants and Kori No. 2 plant, alarm cause tracking systems for Kori No. 2 plant and OPR1000, and signal fault detection and diagnosis methods for deaerators and steam generators. During the second stage(2004.7.1-2008.4.30), we supported other KNICS projects by reviewing RPS COM display designs three times, developing ESF-CCS COM style guides and reviewing ESF-CCS COM display design, reviewing CRCS LOM and PCS MTP display designs, and developing requirements for DCS GUI components. We also developed integrated style guide for I and C cabinet operator module display designs. In cooperative research with KOPEC-AE, we developed basic technologies for advanced HSI design including task analysis methods, an information and control requirements database, display design criteria, a HSI prototype with its evaluation, and methods for human factors engineering verification and validation.

  14. A simplified Suomi NPP VIIRS dust detection algorithm

    Science.gov (United States)

    Yang, Yikun; Sun, Lin; Zhu, Jinshan; Wei, Jing; Su, Qinghua; Sun, Wenxiao; Liu, Fangwei; Shu, Meiyan

    2017-11-01

    Due to the complex characteristics of dust and sparse ground-based monitoring stations, dust monitoring is facing severe challenges, especially in dust storm-prone areas. Aim at constructing a high-precision dust storm detection model, a pixel database, consisted of dusts over a variety of typical feature types such as cloud, vegetation, Gobi and ice/snow, was constructed, and their distributions of reflectance and Brightness Temperatures (BT) were analysed, based on which, a new Simplified Dust Detection Algorithm (SDDA) for the Suomi National Polar-Orbiting Partnership Visible infrared Imaging Radiometer (NPP VIIRS) is proposed. NPP VIIRS images covering the northern China and Mongolian regions, where features serious dust storms, were selected to perform the dust detection experiments. The monitoring results were compared with the true colour composite images, and results showed that most of the dust areas can be accurately detected, except for fragmented thin dusts over bright surfaces. The dust ground-based measurements obtained from the Meteorological Information Comprehensive Analysis and Process System (MICAPS) and the Ozone Monitoring Instrument Aerosol Index (OMI AI) products were selected for comparison purposes. Results showed that the dust monitoring results agreed well in the spatial distribution with OMI AI dust products and the MICAPS ground-measured data with an average high accuracy of 83.10%. The SDDA is relatively robust and can realize automatic monitoring for dust storms.

  15. Analyses for licensing of new fuel types at Paks NPP

    International Nuclear Information System (INIS)

    Kereszturi, A.; Bogatyr, S.; Miko, S.; Nemes, I.

    2003-01-01

    In the last years Paks NPP initiated several projects aiming at the introduction of new fuel types and resulting in more economic fuel cycles. The motivations, the reasons, and the economic consequences of the above modifications are detailed. The application of a new fuel type requires the renewal of the relevant chapters of the Safety Analysis Report. The fulfilment of fuel design basis requirements, to be summarised briefly also in the paper, must be investigated during normal and accidental conditions. The characteristics of the different codes, the data transfer between them are detailed. After, the cases of the Normal Operation, Anticipated Operation Occurrence, and the Postulated Accidents, judged as the most relevant ones in case of fuel modifications, are overviewed. In the last part, selected examples of the licensing calculations, performed by the above tools are presented. In conclusion, modifications of the WWER fuel, namely increased enrichment, application of burnable fuel pins, modified geometry make more economic fuel cycles (larger discharge burnup, power up-rate, reduced pressure vessel fluence) are possible. The further step (increased enrichment, burnable poison) of the fuel modernisation at NPP Paks is necessary for more economic fuel cycles and fuel consuming. A sound basis of licensing methodology, safety analysis, and necessary computer codes for the WWER fuel modernisation is available

  16. Performance indicator system with application to NPP management

    International Nuclear Information System (INIS)

    Gomez, J.; Roldan, J.

    2001-01-01

    The objective of the paper is to present the work that is being conducted in the scope of a research project between Cofrentes NPP and the polytechnic university of Valencia aimed to the development and implementation of a performance indicators system to support plant management. In developing this system, attention is being paid to the areas of safety, production and dependability. The first step in the project was the development of the performance indicator system (PIS), in order to help in assessing the effectiveness of the different activities in plant (i.e. maintenance, inspections, tests, etc.). It is suggested establishing the operational indicators set in 3 levels. The lowest level concerns indicators monitoring performance and maintenance characteristics of components. The next one involves a subset of indicators placed at system level with a similar goal. And finally, the highest level summarizes the impact of the global policy in the whole plant from safety and performance point of view. The definition of an indicator should comprise, at least, the following items: indicator's name, performance area, definition and data needed. A strategy should define what, when and how indicators have to be evaluated, analyzed and reported. This article gives an example application of the methodology at the Cofrentes NPP, collective dose as safety indicator, power production as production indicator and the number of work orders as maintenance indicator are considered and their time evolution is given. (A.C.)

  17. Suomi NPP VIIRS Reflective Solar Bands Operational Calibration Reprocessing

    Directory of Open Access Journals (Sweden)

    Slawomir Blonski

    2015-12-01

    Full Text Available Radiometric calibration coefficients for the VIIRS (Visible Infrared Imaging Radiometer Suite reflective solar bands have been reprocessed from the beginning of the Suomi NPP (National Polar-orbiting Partnership mission until present. An automated calibration procedure, implemented in the NOAA (National Oceanic and Atmospheric Administration JPSS (Joint Polar Satellite System operational data production system, was applied to reprocess onboard solar calibration data and solar diffuser degradation measurements. The latest processing parameters from the operational system were used to include corrected solar vectors, optimized directional dependence of attenuation screens transmittance and solar diffuser reflectance, updated prelaunch calibration coefficients without an offset term, and optimized Robust Holt-Winters filter parameters. The parameters were consistently used to generate a complete set of the radiometric calibration coefficients for the entire duration of the Suomi NPP mission. The reprocessing has demonstrated that the automated calibration procedure can be successfully applied to all solar measurements acquired from the beginning of the mission until the full deployment of the automated procedure in the operational processing system. The reprocessed calibration coefficients can be further used to reprocess VIIRS SDR (Sensor Data Record and other data products. The reprocessing has also demonstrated how the automated calibration procedure can be used during activation of the VIIRS instruments on the future JPSS satellites.

  18. Modernization and power upgrading of the Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Keskinen, A. [IVO Power Engineering Ltd., Vantaa (Finland)

    1997-12-31

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.). 4 refs.

  19. Identification of NPP accidents using support vector classification

    Energy Technology Data Exchange (ETDEWEB)

    Back, Ju Hyun; Yoo, Kwae Hwan; Na, Man Gyun [Chosun University, Gwangju (Korea, Republic of)

    2016-10-15

    In case of the accidents that happens in a nuclear power plants (NPPs), it is very important to identify its accidents for the operator. Therefore, in order to effectively manage the accidents, the initial short time trends of major parameters have to be observed and NPP accidents have to accurately be identified to provide its information to operators and technicians. In this regard, the objective of this study is to identify the accidents when the accidents happen in NPPs. In this study, we applied the support vector classification (SVC) model to classify the initiating events of critical accidents such as loss of coolant accidents (LOCA), total loss of feedwater (TLOFW), station blackout (SBO), and steam generator tube rupture (SGTR). Input variables were used as the initial integral value of the signal measured in the reactor coolant system (RCS), steam generator, and containment vessel after reactor trip. The proposed SVC model is verified by using the simulation data of the modular accident analysis program (MAAP4) code. In this study, the proposed SVC model is verified by using the simulation data of the modular accident analysis program (MAAP4) code. We used an initial integral value of the simulated sensor signals to identify the NPP accidents. The training data was used to train the SVC model. And, the trained model was confirmed using the test data. As a result, it was known that it can accurately classify five events.

  20. Safety of NPP with WWER-440 and WWER-1000 reactors

    International Nuclear Information System (INIS)

    Balabanov, E.; Gledachev, J.; Angelov, D.

    1995-01-01

    The WWER-440 and WWER-1000 reactors used at the Kozloduy NPP have been analyzed in terms of safety. There are currently 4 reactors WWER-440/230 and 2 reactors WWER-1000/320. The former do not comply completely with the modern safety requirements due to the regulations acted in the sixties when they have been designed. The main features of these reactors are: low power density in the core; three levels of reactor control and protection; six primary loops; horizontal steam generators; two turbines; large number of cross-unit connections. The low thermal density in the core, the low specific thermal loading in the rods and the large coolant inventory enhance the safety, while the major deficiencies are identified as follows: insufficient capabilities for emergency core cooling; low diversification and physical separation of the safety systems; old fashioned control systems; inadequate fire protection; lack of full containment. It is pointed out that several design and operation actions have been completed in the Kozloduy NPP in order to enhance their safety. The WWER-1000 units are 320 model and feature a high safety level, complying completely with OPB-82 regulations and with all current international safety standards. 3 refs., 7 figs., 1 tab

  1. Status of the Suomi-NPP VIIRS Moisture Products

    Science.gov (United States)

    Borbas, E. E.; Li, Z.; Menzel, W. P.; Rada, M.

    2017-12-01

    The goal of the Soumi NPP VIIRS Moisture Project is to provide total column water vapor (TPW) properties from merged VIIRS infrared measurements and CrIS plus ATMS water vapor soundings to continue the depiction of global moisture at high spatial resolution started with MODIS. While MODIS has two water vapor channels within the 6.5 μm H2O absorption band and four channels within the 15 μm CO2 absorption band, VIIRS has no channels in either IR absorption band. The VIIRS/CrIS+ATMS TPW algorithm being developed at CIMSS is similar to the MOD07 synthetic regression algorithm. It uses the three VIIRS longwave IR window bands in a regression relation and adds the NUCAPS (CrIS+ATMS) water vapor product to compensate for the absence of VIIRS water vapor channels. This poster presents the methodology and evaluation of the S-NPP TPW Level 2 and 3 products with TPW data from ground-based and satellite-based measurements.

  2. Highly Reliable NPP Instrumentation Using Constant Voltage Feedback Circuits

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Seung J.; Choi, Bo H.; Kim, Ji H.; Rim, Chun T. [KAIST, Daejeon (Korea, Republic of)

    2014-08-15

    A highly reliable nuclear power plant (NPP) instrumentation using constant voltage feedback circuits is proposed. Contrary to conventional NPP instrumentation, two operational amplifiers are used at auxiliary building to supply constant DC voltage across the potentiometer or wheatstone bridge type sensors, such as resistance temperature detectors (RTD) and strain gauges. The proposed constant voltage feedback circuits maintain its output voltage as constant regardless of the length of lead wire from the auxiliary building to the sensors. A detail analysis of the proposed feedback circuits and design procedures including the internal resistance and parasitic LC components of lead wire are presented. A prototype with lumped RLC values for modeling lead wires is fabricated and experimentally verified to supply constant 10V up to 200m distance under 0.8% error. Due to its versatile characteristics with cost effective structure, the proposed scheme can be generally extended to pressure meters and water-level recorders to guarantee robust measurements without conventional current transducers under severe accidents.

  3. Condition Monitoring of Sensors in a NPP Using Optimized PCA

    Directory of Open Access Journals (Sweden)

    Wei Li

    2018-01-01

    Full Text Available An optimized principal component analysis (PCA framework is proposed to implement condition monitoring for sensors in a nuclear power plant (NPP in this paper. Compared with the common PCA method in previous research, the PCA method in this paper is optimized at different modeling procedures, including data preprocessing stage, modeling parameter selection stage, and fault detection and isolation stage. Then, the model’s performance is greatly improved through these optimizations. Finally, sensor measurements from a real NPP are used to train the optimized PCA model in order to guarantee the credibility and reliability of the simulation results. Meanwhile, artificial faults are sequentially imposed to sensor measurements to estimate the fault detection and isolation ability of the proposed PCA model. Simulation results show that the optimized PCA model is capable of detecting and isolating the sensors regardless of whether they exhibit major or small failures. Meanwhile, the quantitative evaluation results also indicate that better performance can be obtained in the optimized PCA method compared with the common PCA method.

  4. Cernavoda NPP Unit 1 - a plant of several generations

    International Nuclear Information System (INIS)

    Rotaru, I.; Metes, M.; Anghelescu, M.S.

    2000-01-01

    Cernavoda NPP Unit 1, the first nuclear power unit in Romania, has a long and tormented history. It represents a rather unique case in Eastern Europe. The project started well before 1989 (the construction phase lasted 17 years and generations were involved in its completion), but it is effectively based on western technology (Candu). Meanwhile, the national nuclear program underwent many changes, affecting the lives and careers of Romanian nuclear professionals. Finally, on December 2 nd 1996, the unit began its c ommercial operation , being operated at its nominal power rating of 706 MW e . It now provides a reliable source of electricity for Romanian economy, supplying to the national grid about 10% of the country's average annual demand. The paper reflects some aspects related to the shift of generations during the project's development, including the present stage. The operational performances achieved 'in service' by Cernavoda NPP Unit 1 up to the end of 1999 , are also presented. Reference to the electrical energy production, performance indicators, production costs, nuclear safety, radiation protection, radioactive wastes, nuclear fuel consumption and nuclear fuel performances are included. Comparisons are performed with similar indicators reported by other worldwide nuclear power plants, in order to assess our results. (authors)

  5. Development of NPP Monitoring and Operation Support Technology

    International Nuclear Information System (INIS)

    Lee, Jung Woon; Park, Jae Chang; Lee, Yong Hee

    2008-04-01

    During the first stage (2001.7.1-2004.6.30), we developed general human factors design guidelines VDU-based workstations, PMAS alarm display design guidelines, PMAS SPADES display design guidelines, and the revision of KHNP HFE guidelines (HF-010), which have been applied to domestic NPP designs. We also supported other KNICS projects by performing RPS COM design reviews, development of RPS COM Style Guide, and a review of CEDMCS cabinet operator module display design. We developed the ADIOS prototype, NPP performance analysis systems for YGN No.1, 2 plants and Kori No. 2 plant, alarm cause tracking systems for Kori No. 2 plant and OPR1000, and signal fault detection and diagnosis methods for deaerators and steam generators. During the second stage(2004.7.1-2008.4.30), we supported other KNICS projects by reviewing RPS COM display designs three times, developing ESF-CCS COM style guides and reviewing ESF-CCS COM display design, reviewing CRCS LOM and PCS MTP display designs, and developing requirements for DCS GUI components. We also developed integrated style guide for I and C cabinet operator module display designs. In cooperative research with KOPEC-AE, we developed basic technologies for advanced HSI design including task analysis methods, an information and control requirements database, display design criteria, a HSI prototype with its evaluation, and methods for human factors engineering verification and validation

  6. To question of NPP power reactor choice for Kazakhstan

    International Nuclear Information System (INIS)

    Batyrbekov, G.A.; Makhanov, Y.M.; Reznikova, R.A.; Sidorenco, A.V.

    2004-01-01

    Full text: The requirements to NPP power reactors that will be under construction in Kazakhstan are proved and given in the report. A comparative analysis of the most advanced projects of power reactors with light and heavy water under pressure of large, medium and low power is carried out. Different reactors have been considered as follows: 1. Reactors with high-power (700 MW(el) and up) such as EPR, French - German reactor; CANDU-9, Canadian heavy-water reactor; System 80+, developed by ABB Combustion Engineering company, USA; KNGR, Korean reactor of the next generation; APWR, Japanese advanced reactor; WWER-1000 (V-392) - development of Atomenergoproect /Gydropress, Russian Federation; EP 1000, European passive reactor. 2. Reactors with medium power (300 MW (el) - 700 MW (el): AP-600, passive PWR of the Westinghouse company; CANDU-6, Canadian heavy-water reactor; AC-600, Chinese passive PWR; WWER-640, Russian passive reactor; MS-600 Japanese reactor of Mitsubishi Company; KSNP-600, South Korean reactor. 3. Reactors with low power (a few MW(el)- 300 MW(el)): IRIS, reactor of IV generation, developed by the International Corporation of 13 organizations from 7 countries, SMART, South Korean integrated reactor; CAREM, Argentina integrated reactor; MRX, Japanese integrated reactor; 'UNITERM', Russian NPP with integrated reactor, development of NIKIET; AHEC-80, Russian NPP, developed by OKBM. A comparison of the projects of the above-mentioned power reactors was carried out with respect to 15 criteria of nuclear, radiating, ecological safety and economic competitiveness, developed especially for this case. Data on a condition and prospects of power production and power consumption, stations and networks in Kazakhstan necessary for the choice of projects of NPP reactors for Kazakhstan are given. According to the data a balance of power production and power consumption as a whole in the country was received at the level of 59 milliard kw/h. However, strong dis balance

  7. To question of NPP power reactor choice for Kazakhstan

    International Nuclear Information System (INIS)

    Batyrbekov, G.A.; Makhanov, Y.M.; Reznikova, R.A.; Sidorenco, A.V.

    2004-01-01

    The requirements to NPP power reactors that will be under construction in Kazakhstan are proved and given in the report. A comparative analysis of the most advanced projects of power reactors with light and heavy water under pressure of large, medium and low power is carried out. Different reactors have been considered as follows: 1. Reactors with high-power (700 MW(el) and up) such as EPR, French - German reactor; CANDU-9, Canadian heavy-water reactor; System 80+, developed by ABB Combustion Engineering company, USA; KNGR, Korean reactor of the next generation; APWR, Japanese advanced reactor; WWER-1000 (V-392) - development of Atomenergoproect /Gydropress, Russian Federation; EP 1000, European passive reactor. 2. Reactors with medium power (300 MW (el) - 700 MW (el): AP-600, passive PWR of the Westinghouse company; CANDU-6, Canadian heavy-water reactor; AC-600, Chinese passive PWR; WWER-640, Russian passive reactor; MS-600 Japanese reactor of Mitsubishi Company; KSNP-600, South Korean reactor. 3. Reactors with low power (a few MW(el)- 300 MW(el)): IRIS, reactor of IV generation, developed by the International Corporation of 13 organizations from 7 countries, SMART, South Korean integrated reactor; CAREM, Argentina integrated reactor; MRX, Japanese integrated reactor; 'UNITERM', Russian NPP with integrated reactor, development of NIKIET; AHEC-80, Russian NPP, developed by OKBM. A comparison of the projects of the above-mentioned power reactors was carried out with respect to 15 criteria of nuclear, radiating, ecological safety and economic competitiveness, developed especially for this case. Data on a condition and prospects of power production and power consumption, stations and networks in Kazakhstan necessary for the choice of projects of NPP reactors for Kazakhstan are given. According to the data a balance of power production and power consumption as a whole in the country was received at the level of 59 milliard kw/h. However, strong dis balance in the

  8. Training on radiation protection in Information Center of Vandellos 1 NPP

    International Nuclear Information System (INIS)

    Preciado, L.; Lopera, A.

    2007-01-01

    The beginning of the Vandellos 1 NPP decommissioning set the starting point of an ambitious communication programme addressed to the different kinds of stake holders which composed the social environment of the site. The National Radioactive Wastes company (ENRESA), as the project performed and the legal responsible for the site, designed a communication plan with a clear formative drive and aimed at total transparency in a event which had not taken place before in Spain. All aspects of Safety became strategic values for the project and, therefore, for its communication activities. This was especially the case with regards to public information and Radiological Protection (RP) training. The seminars for the media, the presentations for the interested organizations and environmental collectives and the informative meetings with the political authorities were accompanied by a discourse and several formative initiatives addressed to the general public, and especially to student visitors. those activities have been developing alongside the decommissioning process, from the organization of visits which made possible an in situ view of the RP procedures to the current offer of a specific RP workshop. (Author)

  9. Delay in the realization of the 'Belene NPP' project in the Republic of Bulgaria

    International Nuclear Information System (INIS)

    Kosev, K.

    2003-01-01

    The 'Belene' site is located in the Svishtov-Belene valley at the bank of the Danube river - at the 571 kilometre - across the Belene island - the largest island in the Danube river. The site is located directly on the river bank, at a distance of 7.5km from the Romanian border. According to the Bulgarian map of seismic regions, the site is part of a region with seismic intensity of grade 8 according to the MSK-64 scale, with a factor Kc 0.15. By the end of 1981 and beginning of 1982 Energoproekt prepared documents for engineering assimilation of the site.The utilisation began in 1982 with elevation of the site level, outside communications and consequent establishment of construction and engineering facilities. In 1982 Energoproekt-Sofia prepared a set of technical and economic documents for the construction of 'Belene' NPP. The documents were reviewed, updated and finally approved in October 1987. The Technical Design for the capital civil engineering works on the site was prepared in 1987 by AEP-Kiev and Energoproekt-Sofia. The capital (basic) civil engineering works started in 1987 - based on the Technical Design, with parallel preparation of first stage Construction Drawings. Active construction works on the plant site took place in 1988 - 1990. In May 1990 the construction activities were restricted due to financial problems, according to a Decision of the Bureau of the Council of Ministers. In 1990 a group of intellectuals stated their doubts about the perfection of the design and the characteristic features of the site. In the middle of 1991 the construction works on the plant site were practically terminated without any official decision, except for the decision of the Council of Ministers for overcoming of the problems, caused by the termination of the plant construction. The successful activities, performed in order to solve the main problems include: seismic analyses, radiological impact assessment, hydrology and water supply assessment. Unsuccessful

  10. Contribution of the Slovak University of Technology Bratislava to the Education of NPP Operation Staff in Slovakia

    International Nuclear Information System (INIS)

    Hascik, J.; Slugen, V.; Hinca, R.; Miglierini, M.

    2006-01-01

    Paper is focused on the preparation of NPP VVER -440 staff in Slovak conditions. The realisation is managed via special technical courses, seminars, workshops, and trainings on selected experimental facilities at domestic as well as international level. Post-gradual re-qualification study: Safety aspects of NPP operation is discussed in detail. Six-year experience with NPP operating staff education can be shared and recommended also at international level. Based on these courses, special training for optimal preparation of NPP supervising physicists was started in 2002. In addition to all our activities, the international course: Safety aspects of NPP operation for subcontractors was prepared and realised in 2005.(author)

  11. Tracking On-Orbit Stability of the Response Versus Scan Angle for the S-NPP VIIRS Reflective Solar Bands

    Science.gov (United States)

    Wu, Aisheng; Xiong, Xiaoxiong; Cao, Changyong

    2016-01-01

    The Visible Infrared Imaging Radiometer Suite (VIIRS) on the Suomi NPP (National Polar-orbiting Partnership) satellite (http:npp.gsfc.nasa.govviirs.html) has been in operation for nearly five years. The onboard calibration of the VIIRS reflective solar bands (RSB) relies on a solar diffuser (SD) located at a fixed scan angle and a solar diffuser stability monitor (SDSM). The VIIRS response versus scan angle (RVS) was characterized prelaunch in ambient conditions and is currently used to determine the on-orbit response for all scan angles relative to the SD scan angle. Since the RVS is vitally important to the quality of calibrated level 1B products, it is important to monitor its on-orbit stability. In this study, the RVS stability is examined based on reflectance trends collected from 16-day repeatable orbits over pre-selected pseudo-invariant desert sites in Northern Africa. These trends nearly cover the entire Earth view scan range so that any systematic drifts in the scan angle direction would indicate a change in RVS. This study also compares VIIRS RVS on-orbit stability results with those from both Aqua and Terra MODIS over the first four years of mission for a few selected bands, which provides further information on potential VIIRS RVS on-orbit changes.

  12. Comparison of Forest and Tundra Ecosystems Npp with Remote Sensing and Ground Observation Data

    Science.gov (United States)

    Ivanova, Yuliya; Ovchinnikova, Nataly; Kryazhimskiy, Fedor; Maklakov, Kirill

    2012-07-01

    In this study we compared two models for NPP estimate: an estimate based on satellite data and an estimate based on biomass calculation for tundra in the Yamal Peninsula and for forest ecosystems at the West Sayan Mountains. Ground NPP estimates were done for the same study areas which made it possible to identify the most significant parameters, specific to each model, that affect the estimates. The main difficulty in NPP-related studies is that current NPP values in an ecosystem cannot be determined exactly. Estimates, however, are feasible, and they can be made using a variety of methods. Thus, it seems important to see the ways in which these methods are different from each other and to find out how close the resulting values are. If these are dissimilar, the parameters used to make NPP estimates should be compared in order to identify the stage that can give rise to defects and errors, and to under- and overestimates. In this study we estimated NPP using the following two approaches: NPP calculation based on ground-truth measurements, such as calculation of plant phytomass on the studied area based on morphometric measurements (height, stem diameter, crown volume, etc.) and variations in this phytomass over a certain time period. NPP calculation based on satellite remote sensing data, using the data of satellite spectral channels and the data on underlying terrain. In this study we used MODIS/TERRA 8-day composite images, namely MOD09A1 and MOD11A2, with the spatial resolution 500 m and 1 km, respectively, obtained from EOS Data Gateway. Different models evaluate NPP using different physical values, with dissimilar temporal and spatial distributions. The NPP values evaluated by two models differ inherently. We used both of the models: GLO-PEM end MODIS-NPP. The study area is situated in the south of the Krasnoyarskii Krai, at the West Sayan Mountains, where the Institute of Forest SB RAS has been conducting observations since 1960. In this area altitudinal

  13. Primary water chemistry for NPP with VVER-TOI

    International Nuclear Information System (INIS)

    Susakin, S.N.; Brykov, S.I.; Zadonsky, N.V.; Bystrova, O.S.

    2012-09-01

    Nowadays within the framework of development of the nuclear power industry in Russia the VVER-TOI reactor is under designing (Standard optimized design). The given design provides for improvement of operation safety level, of technical-economic, operational and load-follow characteristics, and for the raise of competitive capacity of reactor plant and NPP as a whole. In VVER-TOI reactor plant design the primary water chemistry has been improved considering operation experience of VVER reactor plants and a possibility of RP operation under load-follow modes from the viewpoint of meeting the following requirements: - suppression of generation of oxidizing radiolytic products under power operation; - assurance of corrosion resistance of structural materials of equipment and pipelines throughout the NPP design service life; - minimization of deposits on surfaces of the reactor core fuel rods and on heat exchange surface of steam generators; - minimization of accumulation of activated corrosion products; - minimization of the amount of radioactive processing waste. In meeting these requirements an important role is devoted to suppression of generation of oxidizing radiolytic products owing to accumulation of hydrogen in the primary coolant. At NPP with VVER-1000 reactor the ammonia-potassium water chemistry is used wherein the hydrogen accumulation is provided at the expense of ammonia proportioning. Usage of ammonia leads to generation of additional amount of radioactive processing waste and to increased irregularity of maintaining the water chemistry under the daily load-follow modes. In VVER TOI design the primary water chemistry is improved by replacing the proportioning of ammonia with the proportioning of gaseous hydrogen. Different process schemes were considered that provide for a possibility of hydrogen accumulation and maintaining owing to direct proportioning of gaseous hydrogen. The obtained results showed that transition to the potassium water chemistry

  14. Consistent Code Qualification Process and Application to WWER-1000 NPP

    International Nuclear Information System (INIS)

    Berthon, A.; Petruzzi, A.; Giannotti, W.; D'Auria, F.; Reventos, F.

    2006-01-01

    Calculation analysis by application of the system codes are performed to evaluate the NPP or the facility behavior during a postulated transient or to evaluate the code capability. The calculation analysis constitutes a process that involves the code itself, the data of the reference plant, the data about the transient, the nodalization, and the user. All these elements affect one each other and affect the results. A major issue in the use of mathematical model is constituted by the model capability to reproduce the plant or facility behavior under steady state and transient conditions. These aspects constitute two main checks that must be satisfied during the qualification process. The first of them is related to the realization of a scheme of the reference plant; the second one is related to the capability to reproduce the transient behavior. The aim of this paper is to describe the UMAE (Uncertainty Method based on Accuracy Extrapolation) methodology developed at University of Pisa for qualifying a nodalization and analysing the calculated results and to perform the uncertainty evaluation of the system code by the CIAU code (Code with the capability of Internal Assessment of Uncertainty). The activity consists with the re-analysis of the Experiment BL-44 (SBLOCA) performed in the LOBI facility and the analysis of a Kv-scaling calculation of the WWER-1000 NPP nodalization taking as reference the test BL-44. Relap5/Mod3.3 has been used as thermal-hydraulic system code and the standard procedure adopted at University of Pisa has been applied to show the capability of the code to predict the significant aspects of the transient and to obtain a qualified nodalization of the WWER-1000 through a systematic qualitative and quantitative accuracy evaluation. The qualitative accuracy evaluation is based on the selection of Relevant Thermal-hydraulic Aspects (RTAs) and is a prerequisite to the application of the Fast Fourier Transform Based Method (FFTBM) which quantifies

  15. Biking our way to public acceptance: Doel NPP reorients communication policy

    International Nuclear Information System (INIS)

    Souwer, Corinne

    1998-01-01

    Full text: In these days, the existence of a nuclear power station is no longer entirely evident. Especially in Belgium where operating licence is subject to ten-yearly re-evaluations by the authorities. Therefore, the management has to orient its policy not only towards safety and economic operation but also to public acceptance. The Doel NPP management therefore makes use of the equilateral triangle here above, as all three sides are equally important. Although economic operation demands great efforts in cost control, new activities are developed in order to enhance public acceptance - which consequently lead to new investments. Top priority in our external communication policy is the environment. This is quite logical, as the environment is also one of the top priorities in the overall management policy. Thus, Doel NPP is working hard in order to obtain the EMAS certificate(Eco Management and Audit Scheme acknowledged by the European Commission) next spring. External communication is therefore very much oriented towards environmental education projects, which we develop as much as possible in close cooperation with environmental groups. We offer these projects to schools and other public groups by means of a centralized dispatching centre. They include amongst others an eco bicycle tour in the surroundings of the power plant, with information on the typical plant and animal life of the area. We supply well-documented nature brochure and even free bikes to the public. We have also installed an ecological laboratory, specially developed in cooperation with teachers so as to correspond with the learning programmes of secondary schools. The laboratory is manned by a qualified biology teacher. The examined samples for soil and water research come from our own nature reserve (6ha) located on the site of the power plant. Another module consists of guided tours in the power plant. Each visitor ran take a guided bus tour on site. and take a look at the control room, the

  16. Safety evaluation report: licensing of the unit 1 of Ignalina NPP

    International Nuclear Information System (INIS)

    Kutas, S.; Aleev, A.; Demchenko, M.; Krenevichius, R.

    1999-07-01

    In the report presented detailed overview of the licensing process of licensing of the unit 1 of Ignalina NPP which started in 1997 and was successfully finished on July 1999 by issuing license. There was a delay of two month from the schedule because Ignalina NPP not fulfilled all requirements and VATESI stopped operation of the unit until all requirements will be satisfied. Licensing covered many areas of Ignalina NPP operation and related fields such as emergency preparedness, radiation protection and radioactive waste management

  17. Improvements in the system of reliability provisions for NPP component operation

    International Nuclear Information System (INIS)

    Plastov, V.P.

    1986-01-01

    The ways for improvement of operational reliability of NPP basic equipment are considered. For recording, storage and systematization of the information on the quality and reliability of NPP equipment the ''Nadezhnost'' automated information system which can operate on-line with any ES computer is developed. The perspective trend in evaluation and control of NPP system reliability is the development of such calculational and experimental methods which take into account all forms of tests and information on reliability of equipment in the course of operation

  18. Qualitative and quantitative methods for human factor analysis and assessment in NPP. Investigations and results

    International Nuclear Information System (INIS)

    Hristova, R.; Kalchev, B.; Atanasov, D.

    2005-01-01

    A description of the most frequently used approaches for human reliability assesment is given. The relation between different human factor causes for human induced events in Kozloduy NPP during the period 2000 - 2003 is discussed. A comparison between the contribution of the casual factors for events occurrences in Kozloduy NPP and an Japanese NPP is presented. It can be concluded that for both NPPs the most important casual factors are: 1) written procedures and documents; 2) man-machine interface; 3) environmental working conditions; 4) working practice; 5) training and qualification; 6) supervising methods

  19. Irradiation Embrittlement Monitoring Programs of RPV's in the Slovak Republic NPP's

    International Nuclear Information System (INIS)

    Kupca, Ludovik

    2006-01-01

    Four types of surveillance programs were (are) realized in Slovak NPP's: 'Standard Surveillance Specimen Program' (SSSP) was finished in Jaslovske Bohunice V-2 Nuclear Power Plant (NPP) Units 3 and 4, 'Extended Surveillance Specimen Program' (ESSP), was prepared for Jaslovske Bohunice NPP V-2 with aim to validate the SSSP results, For the Mochovce NPP Unit 1 and 2 was prepared completely new surveillance program 'Modern Surveillance Specimen Program' (MSSP), based on the philosophy that the results of MSSP must be available during all NPP service life, For the Bohunice V-1 NPP was finished 'New Surveillance Specimen Program' (NSSP) coordinated by IAEA, which gave arguments for prolongation of service life these units for minimum 20 years, New Advanced Surveillance Specimen Program (ASSP) for Bohunice V-2 NPP (units 3 and 4) and Mochovce NPP (units 1, 2) is approved now. ASSP is dealing with the irradiation embrittlement of heat affected zone (HAZ) and RPV's austenitic cladding, which were not evaluated till this time in surveillance programs. SSSP started in 1979 and was finished in 1990. ESSP program started in 1995 and will be finished in 2007, was prepared with aim of: increasing of neutron fluence measurement accuracy, substantial improvement the irradiation temperature measurement, fixed orientation of samples to the centre of the reactor core, minimum differences of neutron dose for all the Charpy-V notch and COD specimens, the dose rate effect evaluation. In the year 1996 was started the new surveillance specimen program for the Mochovce RPV's unit-1 and 2, based on the fundamental postulate - to provide the irradiation embrittlement monitoring till the end of units operation. The 'New Surveillance Specimen Program' (NSSP) prepared in the year 1999 for the Bohunice V-1 NPP was finished in the year 2004. Main goal of this program was to evaluate the weld material properties degradation due to the irradiation and recovery efficiency by annealing too. The

  20. Role and responsibilities of management in NPP personnel training and competence. Working material

    International Nuclear Information System (INIS)

    1994-01-01

    The main aim and result of this seminar was imparting knowledge to various levels of Paks NPP management on their special tasks and responsibilities to achieve personnel competence, which include: meeting relevant regulatory and other requirements; defining the qualifications for NPP personnel jobs; training using systematic approach to training to attain the required level of qualification and competence of all NPP personnel, which includes management, operations, maintenance and technical support personnel and others; recruiting and retaining qualified personnel, including career development; supporting the training of all personnel on their responsibilities for introducing, maintaining and improving safety. Refs, figs and tabs