  1. About choosing the power unit of NPP

    International Nuclear Information System (INIS)

    Alekseev, P.N.; Mordashev, V.M.; Proshkin, A.A.; Stukalov, V.A.; Subbotin, S.A.; Tsibul'skij, V.F.; Chernilin, Yu.F.

    2008-01-01

    The present-day domestic nuclear power industry faces the necessity to make both process and economy related decisions. The mentioned decisions should cover all the aspects of the nuclear power complex. In particular, as of now, no substantiation of the present-day and the future requirements for the power unit of the WWER and fast reactor NPPs is available. The choice of the unit power of an NPP should involve consideration of all factors and should not be boiled down to the efforts to ensure the minimization of the investment and the operation constituents of the electric power generation costs. The aim of the present paper was to ensure elaboration of the recommendations to substantiate the optimal unit power of NPP power units based on the analysis of various factors to design, to construct and to operate an NPP (investment, time of construction, the unscheduled shutdown losses, the unification, the fabrication quality, the accident damage, etc.), and the electrical network potentialities and the regional electric power demands [ru

  2. Assessment of financial expenditure for Rivne NPP power units decommissioning

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Salij, L.M.

    2007-01-01

    The article covers some financial aspects of developing a decommissioning concept for Rivne NPP power units with reactor VVER-440 and VVER-1000. Possible methodological approaches to costs estimate have been analyzed. Preliminary results of cost estimation are presented for two decommissioning options: deferred and immediate dismantling. Principally possible options for accumulating assets have been analyzed to finance measures related to Rivne NPP decommissioning. A mathematical model has been proposed for creating decommissioning financial reserve

  3. Study on the power control system for NPP power unit with the WWER-440 reactor

    International Nuclear Information System (INIS)

    Aleksandrova, N.D.; Naumov, A.V.

    1981-01-01

    Results of model investigations into basic version of the power control systems (PCS) conformably to the WWER-440 NPP power unit are stated. Transient processes in the power unit system when being two PCS versions during perturbations of different parameters: unit power, vapour pressure or position of control rods have been simulated. Investigations into the different PCS versions show that quality of operation of a traditional scheme with a turbine power controller and reactor pressure controller can be significantly improved with the introduction of a high-speed signal of pressure into the reactor controller. The PCS version with the compensation of interrelations between the turbine and reactor controllers constructed according to the same principles as the standard schemes of power units of thermal electric power plant is perspective as well [ru

  4. Conceptual Design of a Combined Power Generation Unit at the NPP Seaside

    International Nuclear Information System (INIS)

    Cha, Kyung H.

    2011-01-01

    In order to improve operational performance, an undersea tunnel is being utilized for in-taking and out-taking seawater as coolant in Nuclear Power Plant (NPP). This paper describes a Combined solar-wind-wave Power Generation Unit (CPGU) to be specialized for in-taking and out-taking seawater as coolant in NPP. Accordingly, the purpose of the CPGU is twofold: one is to contain some tunnels to be maintained on the bottom of the CPGU body in order to in-take and out-take coolant water, and the other is to generate a combined power at the NPP seaside. Fig. 1 shows the conceptual CPGU to be configured at the NPP seaside

  5. Level 1 shutdown and low power operation of Mochovce NPP, Unit 1, Slovakia

    International Nuclear Information System (INIS)

    Halada, P.; Cillik, I.; Stojka, T.; Kuzma, M.; Prochaska, J.; Vrtik, L.

    2004-01-01

    The paper presents general approach, used methods and form of documentation of the results that have been applied within the shutdown and low power PSA (SPSA) study for Mochovce NPP, Unit 1, Slovakia. The SPSA project was realized by VUJE Trnava Inc., Slovakia in 2001-2002 years. The Level 1 SPSA study for Mochovce NPP Unit 1 covers internal events as well as internal (fires, floods and heavy load drop) and external (aircraft crash, extreme meteorological conditions, seismic event and influence of surrounding industry) hazards. Mochovce NPP consists of two operating units equipped with VVER 440/V213 reactors safety upgraded before construction finishing and operation start. 87 safety measures based on VVER 440 operational experience and international mission insights were implemented to enhance its operational and nuclear safety. The SPSA relates to full power PSA (FPSA) as a continuation of the effort to create a harmonized level 1 PSA model for all operational modes of the plant with the goal to use it for further purposes as follows: Real Time Risk Monitor, Maintenance Optimization, Technical Specifications Optimization, Living PSA. (author)

  6. Compex system for teaching and training operators for TPP and NPP power units

    International Nuclear Information System (INIS)

    Tsiptsyura, R.D.

    1985-01-01

    Requirements, taken as a principle for constructing the system for operator teaching and training (OTT), have been formulated on the basis of investigation of operators' work at TPP and NPP power units. Functional structure and a structural block-diagram for OTT are built. As a criterion, which determines the structure of any trainers, being a part of OTT a requirement has been chosen satisfying the correspondence beetween habits developed with the help of trainers and habits of real operators' work. Results of analysis permit to confirm that refusal or under statement of the role of any stage of operator training leads to reduction of quality of his training

  7. Operation time extension for power units of the first generation NPP and the liability for potential damage

    International Nuclear Information System (INIS)

    Kovalevich, O.M.

    2000-01-01

    The problem on the operation time extension for the six operating NPP first generation power units is discussed. However it is not advisable to improve the safety of these power units up to the acceptable level, therefore there arises the contradiction between the operation time extension of these power units and potential damage for the population. The possibility of having the increased civilian-legal responsibility for potential harm and losses in case of an accident is proposed to be considered as a compensating measure. The measures for realization of this civilian-legal responsibility are described [ru

  8. Methodology and measures for preventing unacceptable flow-accelerated corrosion thinning of pipelines and equipment of NPP power generating units

    Science.gov (United States)

    Tomarov, G. V.; Shipkov, A. A.; Lovchev, V. N.; Gutsev, D. F.

    2016-10-01

    Problems of metal flow-accelerated corrosion (FAC) in the pipelines and equipment of the condensate- feeding and wet-steam paths of NPP power-generating units (PGU) are examined. Goals, objectives, and main principles of the methodology for the implementation of an integrated program of AO Concern Rosenergoatom for the prevention of unacceptable FAC thinning and for increasing operational flow-accelerated corrosion resistance of NPP EaP are worded (further the Program). A role is determined and potentialities are shown for the use of Russian software packages in the evaluation and prediction of FAC rate upon solving practical problems for the timely detection of unacceptable FAC thinning in the elements of pipelines and equipment (EaP) of the secondary circuit of NPP PGU. Information is given concerning the structure, properties, and functions of the software systems for plant personnel support in the monitoring and planning of the inservice inspection of FAC thinning elements of pipelines and equipment of the secondary circuit of NPP PGUs, which are created and implemented at some Russian NPPs equipped with VVER-1000, VVER-440, and BN-600 reactors. It is noted that one of the most important practical results of software packages for supporting NPP personnel concerning the issue of flow-accelerated corrosion consists in revealing elements under a hazard of intense local FAC thinning. Examples are given for successful practice at some Russian NPP concerning the use of software systems for supporting the personnel in early detection of secondary-circuit pipeline elements with FAC thinning close to an unacceptable level. Intermediate results of working on the Program are presented and new tasks set in 2012 as a part of the updated program are denoted. The prospects of the developed methods and tools in the scope of the Program measures at the stages of design and construction of NPP PGU are discussed. The main directions of the work on solving the problems of flow

  9. Unit Commissioning of “Belene” NPP (Bulgaria)

    International Nuclear Information System (INIS)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  10. Principles of tariff determination for NPP electric power generation

    International Nuclear Information System (INIS)

    Ratnikov, B.E.; Gitel'man, L.D.; Artemov, Yu.N.; Fiantsev, V.S.

    1988-01-01

    Foundations of price-setting and order of accounting arrangement for NPP electric power are considered. NPP tariffs are established proceeding from standard costs of power generation. The standards are differentiated as to NPP groups, depending on technical, regional and natural geographic factors, taking into account the facility type, unit capacity and the number of similar NPP units. The conclusion is made that under conditions of NPP economic independence expansion and creation of prerequisites for going over to self-financing principles and also due to the qualitatively new stage of nuclear power generation development the level of efficiency, forseen by the tariffs, should be increased

  11. Renovation of the 'old' NPP units as an economically effective way of nuclear power development

    International Nuclear Information System (INIS)

    Zrodnikov, A.V.; Toshinsky, G.I.; Komlev, O.G.; Dragunov, Yu.G.; Stepanov, V.S.; Klimov, N.N.; Kopytov, I.I.; Krushelnitsky, V.N.

    2005-01-01

    In the process of nuclear power development there comes a phase when the old' power-units, which reactor installations have expired the designed and extended service lifetime are withdrawn from operating. At this phase in the case of the same annual investments into nuclear power, the increase of the total set up capacity of the nuclear power will be terminated because introduction of capacities due to construction of 'new' power-units only compensates for the reduction of capacities caused by withdrawing from operating the 'old' power-units. Along with this, taking into account a sizeable difference in the service lifetime of the nuclear steam supplying systems and the rest infrastructure of the nuclear power plants, it is an opportunity to find the solution to the problem of compensating for the withdrawn capacities without considerable increasing the annual investments. This opportunity is connected with use of the innovative nuclear power technology based on multipurpose small power modular fast reactors with lead-bismuth coolant for replacement of the withdrawn capacities (renovation of power-units). The features of the innovative nuclear power technology based on the SVBR-76/100 reactor installations, the results of the technical and economical investigations that demonstrate the high economical efficiency of use of the renovation technology using the SVBR-75/100 reactor modules are presented in the Paper. (author)

  12. Some aspects of correction additions optimisation of water chemistry regime of Kozloduy NPP power units 3 and 4

    International Nuclear Information System (INIS)

    Topalova, I.

    2005-01-01

    Optimization of the water-chemistry regime is a major corrective measure for minimization of the corrosion processes of the nuclear power unit equipment. Research done in NPP Kozloduy III - IV power units concerning the migration of the corrosion products in the water of secondary circuit as well as the connection between corrosion processes and fluctuation in parameters of the applied water-chemistry regime are reported. Analysis of the dependences obtained lead to conclusions for optimization of the water chemistry regime of secondary circuit and minimization of the corrosion processes and improvement of corrosion condition of metal surfaces. The research is done for the circuit of each of the 8 turbines of the two power units for a period of 10 days. Data received is quantitatively representative /40-50 points/ for performing of analysis and reaching certain conclusions for the water chemistry regime and development of corrosion processes. Dependence of iron and copper concentration in the work medium on the pH, ammonia and hydrazine concentration as well as the dependence of pH on ammonia concentration in case of different quantity and composition of corrosion products on the different power units' equipment metal surfaces are shown. (author)

  13. Risk analysis of NPP in multi-unit site for configuration of AAC power source

    International Nuclear Information System (INIS)

    Kim, Myung Ki

    2000-01-01

    Because of the difficulties in finding new sites for nuclear power plants, more units are being added to the existing sites. In these multi-unit sites, appropriate countermeasures should be established to cope with the potential station blackout (SBO) accident. Currently, installation of additional diesel generator (DG) is considered to ensure an alternative AC power source, but it has not been decided yet how many DGs should be installed in a multi-unit site. In this paper, risk informed decision making method, which evaluates reliability of electrical system, core damage frequency, and site average core damage frequency, is introduced to draw up the suitable number of DG in multi-unit site. The analysis results show that installing two DGs lowered the site average core damage frequency by 1.4% compared to one DG in six unit site. In the light of risk-informed decisions in regulatory guide 1.174, there is no difference of safety between two alternatives. It is concluded that one emergency diesel generator sufficiently guarantees safety against station blackout of nuclear power plants in multi-unit site. (author)

  14. Computer-aided design system for a complex of problems on calculation and analysis of engineering and economical indexes of NPP power units

    International Nuclear Information System (INIS)

    Stepanov, V.I.; Koryagin, A.V.; Ruzankov, V.N.

    1988-01-01

    Computer-aided design system for a complex of problems concerning calculation and analysis of engineering and economical indices of NPP power units is described. In the system there are means for automated preparation and debugging of data base software complex, which realizes th plotted algorithm in the power unit control system. Besides, in the system there are devices for automated preparation and registration of technical documentation

  15. Digital protection in power plants. Electrical unit and line protection. Digital protection systems for NPP

    International Nuclear Information System (INIS)

    Kaczmarek, A.

    2000-01-01

    In this presentation author deals with the digital protection systems for nuclear power plants. The evolution of protection devices, protection concept for power plants, concept of functional redundancy, references for digital protection, benefits for the customer well as concept fault recorder are presented. (author)

  16. NPP Cernavoda Unit 2 Financing Completion Works

    International Nuclear Information System (INIS)

    Chirica, T.; Stefanescu, A.; Constantin, C.; Dobrin, M.

    2002-01-01

    NPP Cernavoda Unit 2 completion is the highest priority of the Romanian power sector strategy. The nuclear energy represents, through its technological features of adopted solution (a CANDU nuclear power plant) and also through technological and economical performance indicators, the best solution to fulfill the demands concerning the sustainable development and the electricity request. The guidelines of energy strategy regarding the nuclear sector development in Romania are framing in the general policy for energy system development at least costs and they are responding to requests concerning the environment and people protection. The paper presents the financing alternatives for Unit 2 completion works taking into consideration the financing market conditions. The paper presents the impact of the financing conditions on the project efficiency, as well as the facilities offered by the Romanian Government in order to support this project. (author)

  17. Nuclear Power Plant (NPP) safety in Brazil

    International Nuclear Information System (INIS)

    Lederman, L.

    1980-01-01

    The multidisciplinary aspects of the activities involved in the nuclear power plant (NPP) licensing, are presented. The activities of CNEN's technical staff in the licensing of Angra-1 and Angra-2 power plants are shown. (E.G.) [pt

  18. Application of safety standards and rules in the Shelter Implementation Plan at the destroyed power unit of Chernobyl NPP

    International Nuclear Information System (INIS)

    Berthold, A.; Bogorinski, P.; Bykov, V.; Redko, V.; Erickson, L.; Kadkin, Ye.; Kondratiev, S.; Simonov, I.; Smyshliaieva, S.; Yesipenko, Yu.

    2002-01-01

    This report deals with the application of safety standards and rules to the Shelter Implementation Plan (SIP) measures. Since 1998 this plan is being implemented at the Chornobyl NPP destroyed unit (which is now known as the Shelter). It includes a set of various tasks whose performance will help partially achieve the established safety objectives. The Regulatory Authority should establish for the Shelter safety goals, principles, and criteria in general, while the Operator of the Shelter is free to independently select the optimum method for their implementation. The Operator of the Shelter must demonstrate (in safety analysis report) that established safety goals are achieved and safety principles and criteria are met. Safety goals, principles, and criteria established for radioactive waste management are reasonable to apply in measures provided for by SIP. However, due to the unique nature of the Shelter, some criteria should not be applied directly and in full scope. Norms and rules on radiation protection should be applied in full scope. The specifics of radiation protection during each Shelter-related activity are considered individually. Safety standards and rules related to technical aspects are reasonable only as a basis. Effective resolution of specific technical issues associated with safety assurance is achieved through interaction between the Operator and the Regulatory Authority during design of SIP structures and systems. Hence, effectiveness of the licensing process plays an important role in the success of the SIP.(author)

  19. Post-reconstruction full power and shut down level 2 PSA study for Unit 1 of Bohunice V1 NPP

    International Nuclear Information System (INIS)

    Kovacs, Z.

    2003-01-01

    The level 2 PSA model of the J. Bohunice V1 NPP was developed in the RISK SPECTRUM Professional code with the following objectives: to identify the ways in which radioactive releases from the plant can occur following the core damage; to calculate the magnitudes and frequency of the release; to provide insights into the plant behaviour during a severe accident; to provide a framework for understanding containment failure modes; the impact of the phenomena that could occur during and following core damage and have the potential to challenge the integrity of the confinement; to support the severe accident management and development of SAMGs. The magnitudes of release categories are calculated using: the MAAP4/VVER for reactor operation and shutdown mode with closed reactor vessel and the MELCOR code for shutdown mode with open reactor vessel. In this paper an overview of the Level 2 PSA methodology; description of the confinement; the interface between the level 1 and 2 PSA and accident progression analyses are presented. An evaluation of the confinement failure modes and construction of the confinement event trees as well as definition of release categories, source term analysis and sensitivity analyses are also discussed. The presented results indicate that: 1)for the full power operation - there is an 25% probability that the confinement will successfully maintain its integrity and prevent an uncontrolled fission product release; the most likely mode of release from the confinement is a confinement bypass after SGTM with conditional probability of 30%; the conditional probability for the confinement isolation failure probability without spray is 5%, for early confinement failure at the vessel failure is 4%, for other categories 1% or less; 2) for the shutdown operating modes - the shutdown risk is high for the open reactor vessel and open confinement; important severe accident sequences exists for release categories: RC5.1, RC5.2 and RC6.2

  20. Cernavoda NPP Unit 1 - a plant of several generations

    International Nuclear Information System (INIS)

    Rotaru, I.; Metes, M.; Anghelescu, M.S.

    2001-01-01

    The paper reflects some key aspects related to the shift of generations during the project's development, including the present stage. Further, the place of Cernavoda NPP Unit 1 in the Romanian power sector and among other nuclear stations in the world is presented. The operational performances achieved 'in service' up to the end of 1999, with reference to the performance indicators for electrical energy production, nuclear safety, radiation protection, radioactive wastes and nuclear fuel are illustrated. For all of these items, comparisons are performed with similar indicators reported by other worldwide nuclear power plants, in order to assess our results. Finally, some comments about Cernavoda NPP Unit 2 project status and need to completion and commissioning it are included. (authors)

  1. Core power capability verification for PWR NPP

    International Nuclear Information System (INIS)

    Xian Chunyu; Liu Changwen; Zhang Hong; Liang Wei

    2002-01-01

    The Principle and methodology of pressurized water reactor nuclear power plant core power capability verification for reload are introduced. The radial and axial power distributions of normal operation (category I or condition I) and abnormal operation (category II or condition II) are simulated by using neutronics calculation code. The linear power density margin and DNBR margin for both categories, which reflect core safety, are analyzed from the point view of reactor physics and T/H, and thus category I operating domain and category II protection set point are verified. Besides, the verification results of reference NPP are also given

  2. Human reliability analysis approach to level 1 PSA - shutdown and low power operation of Mochovce NPP, Unit 1, Slovakia

    International Nuclear Information System (INIS)

    Stojka, Tibor; Holy, Jaroslav

    2003-01-01

    The paper presents general approach, used methods and form of documentation of the results as have been applied within the Human Reliability Analysis (HRA) task of the shutdown and low power PSA (SPSA) study for Mochovce nuclear power plant, Unit 1, Slovakia. The paper describes main goals of the HRA task within the SPSA project, applied methods and data sources. Basic steps of the HRA task and human errors (HE) classification are also specified in its first part. The main part of the paper deals with pre-initiator human errors, human-induced initiators and response to initiator human errors. Since the expert judgment method (SLIM) was used for the last type of human errors probability assessment, also related activities are described including preparation works (performance shaping factors (PSFs) selection, development of PSF classification tables, preparation of aid tools for interview with plant experts), qualitative analysis (sources of information and basic steps) and quantitative analysis itself (human errors classification for final quantification including criteria used for the classification, description of structure of the spreadsheet used for quantification and treatment with dependencies). The last part of the paper describes form of documentation of the final results and provides some findings. (author)

  3. Experience in NPP operation and prospects of nuclear power development in France

    International Nuclear Information System (INIS)

    Lekler, Zh.

    1986-01-01

    Main results and perspectives of nuclear power development in France are analysed. Data characterizing operation of NPPs with PWR reactors in France and leading capitalist countries are given. Problems related to the organization of works on control of NPP operation and its maintenance are discussed. Power utilization factor for french power units amounted to 75% in 1984. NPP share of all electric power generated in the country constituted 59%. Emergency reactor shut-downs took 5% of calendar time in 1984

  4. Startup physics tests at Temelin NPP, Unit 1

    International Nuclear Information System (INIS)

    Sedlacek, M.; Minarcin, M.; Toth, L.; Elko, M.; Hascik, R.

    2002-01-01

    The objective, scope and proceedings of the physics tests of Temelin NPP, Unit 1 physical commissioning are given in this paper. Furthermore, some results of selected physics tests are presented: reactor initial criticality test, determination of reactor power range for physics testing, measurement of control rod cluster assembly group no. 10 reactivity worth in case of limitation system LS(a) actuation, control rod cluster assembly system reactivity worth measurement with single rod cluster assembly of greatest reactivity worth stuck in fully withdrawn position, measurement of differential reactivity worth of control rod cluster assembly group no. 9, boron 'endpoint' determination and measurement of power reactivity coefficient (Authors)

  5. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 3E. Kozloduy NPP units 5/6: Analysis/testing. Working material

    International Nuclear Information System (INIS)

    1996-01-01

    The Co-ordinated research programme on the benchmark study for the seismic analysis and testing of WWER-type nuclear power plants was initiated subsequent to the request from representatives of Member States. The conclusions adopted at the Technical Committee Meeting on Seismic Issues related to existing nuclear power plants held in Tokyo in 1991 called for the harmonization of methods and criteria used in Member States in issues related to seismic safety. The Consulltants' Meeting which followed resulted in producing a working document for CRP. It was decided that a benchmark study is the most effective way to achieve the principal objective. Two types of WWER reactors (WWER-440/213 and WWER-1000) were selected as prototypes for the benchmark exercise to be tested on a full scale using explosions and/or vibration generators. The two prototypes are Kozloduy Units 5/6 for WWER-1000 and Paks for WWER-440/213 nuclear power plants. This volume of Working material contains reports on data related to floor response spectra of Kozloduy NPP; calculational-experimental examination and ensuring of equipment and pipelines seismic resistance at starting and operating WWER-type NPPs; analysis of design floor response spectra and testing of the electrical systems; experimental investigations and seismic analysis Kozloduy NPP; testing of components on the shaking table facilities and contribution to full scale dynamic testing of Kozloduy NPP; seismic evaluation of the main steam line, piping systems, containment pre-stressing and steel ventilation chimney of Kozloduy NPP

  6. Cernavoda NPP Unit 1 - a plant of several generations

    International Nuclear Information System (INIS)

    Rotaru, I.; Metes, M.; Anghelescu, M.S.

    2000-01-01

    Cernavoda NPP Unit 1, the first nuclear power unit in Romania, has a long and tormented history. It represents a rather unique case in Eastern Europe. The project started well before 1989 (the construction phase lasted 17 years and generations were involved in its completion), but it is effectively based on western technology (Candu). Meanwhile, the national nuclear program underwent many changes, affecting the lives and careers of Romanian nuclear professionals. Finally, on December 2 nd 1996, the unit began its c ommercial operation , being operated at its nominal power rating of 706 MW e . It now provides a reliable source of electricity for Romanian economy, supplying to the national grid about 10% of the country's average annual demand. The paper reflects some aspects related to the shift of generations during the project's development, including the present stage. The operational performances achieved 'in service' by Cernavoda NPP Unit 1 up to the end of 1999 , are also presented. Reference to the electrical energy production, performance indicators, production costs, nuclear safety, radiation protection, radioactive wastes, nuclear fuel consumption and nuclear fuel performances are included. Comparisons are performed with similar indicators reported by other worldwide nuclear power plants, in order to assess our results. (authors)

  7. Nuclear Power Plant Module, NPP-1: Nuclear Power Cost Analysis.

    Science.gov (United States)

    Whitelaw, Robert L.

    The purpose of the Nuclear Power Plant Modules, NPP-1, is to determine the total cost of electricity from a nuclear power plant in terms of all the components contributing to cost. The plan of analysis is in five parts: (1) general formulation of the cost equation; (2) capital cost and fixed charges thereon; (3) operational cost for labor,…

  8. Financing nuclear projects. Case study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.; Lebedev, A.; Dobrin, M.

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) in a country is a major undertaking for all entities involved, due to the necessity of planning work and co-ordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the people. Having in view the specific investment cost (relatively high) for a NPP, to find an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and second, the mathematical modelling of the financing structure effects on the project. In this respect, the paper proposed will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentations requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, power purchase contract, etc.) The case study will be focused on the phases achieved in order to promote the Unit 2 Cernavoda NPP completion works project. (author)

  9. Estimation of the radiation risks for population in the process of the BN-600 power unit operation at the Beloyarsk NPP

    International Nuclear Information System (INIS)

    Koltik, I.I.; Oshkanov, N.N.

    2005-01-01

    Dose burdens on the population are the main criterion in estimating the radiological risks during NPP operation. Results of analysis of annual dose burdens on the population in the period of the BN-600 unit operation are presented. Data on individual and collective doses due to gas-aerosol and liquid effluents of radionuclides from the BN-600 unit on critical groups of population are presented. Data on collective doses due to other types of reactors are provided. It is shown that the risks stemming from the BN type reactors are approximately 2 orderers below the risks of channel-type and WWER-reactors [ru

  10. Financing Nuclear Projects. Case Study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, Teodor; Constantin, Carmencita; Dobrin, Marian

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) is a major undertaking for all entities involved, due to the necessity of planning work and coordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the public. Having in view the specific investment costs (relatively high) for a NPP, finding an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and secondly, the mathematical modelling of the financing structure effects on the projects. In this respect, the paper will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentation requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, purchase contract, etc). The case study will be focused on the phases achieved in order to promote the Unit 2 NPP Cernavoda completion works project. (authors)

  11. Balancing preventive and corrective maintenance in Cernavoda Unit 1 NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Marinescu, S.

    2000-01-01

    The paper presents a short reminder of Romania's Cernavoda NPP entering commercial operation and a brief description of the CANDU-6 project on which Unit 1 is based. The short term objectives of the maintenance management, the status of the existing maintenance programmes as well as future predictable maintenance programmes are outlined together with the Government plan to complete the balance of NPP. (author)

  12. Digital Components in Swedish NPP Power Systems

    International Nuclear Information System (INIS)

    Karlsson, Mattias; Eriksson, Tage

    2015-01-01

    Swedish nuclear power plants have over the last 20 years of operation modernised or exchanged several systems and components of the electrical power system. Within these works, new components based on digital technology have been employed in order to realize functionality that was previously achieved by using electro-mechanical or analogue technology. Components and systems such as relay protection, rectifiers, inverters, variable speed drives and diesel-generator sets are today equipped with digital components. Several of the systems and components fulfil functions with a safety-role in the NPP. Recently, however, a number of incidents have occurred which highlight deficiencies in the design or HMI of the equipment, which warrants questions whether there are generic problems with some applications of digital components that needs to be addressed. The use of digital components has presented cost effective solutions, or even the only available solution on the market enabling a modernisation. The vast majority of systems using digital components have been operating without problems and often contribute to improved safety but the challenge of non-detectable, or non-identifiable, failure modes remain. In this paper, the extent to which digital components are used in Swedish NPP power systems will be presented including a description of typical applications. Based on data from maintenance records and fault reports, as well as interviews with designers and maintenance personnel, the main areas where problems have been encountered and where possible risks have been identified will be described. The paper intends to investigate any 'tell-tales' that could give signals of unwanted behaviour. Furthermore, particular benefits experienced by using digital components will be highlighted. The paper will also discuss the safety relevance of these findings and suggest measures to improve safety in the application of digital components in power systems. (authors)

  13. NPP Mochovce units 1 and 2 diagnostic systems

    International Nuclear Information System (INIS)

    Heidenreich, S.

    1997-01-01

    In this paper the diagnostic systems (leak detection monitoring, vibration monitoring, lose parts monitoring, fatigue monitoring) of NPP Mochovce units 1 and 2 are presented. All of the designed diagnostic systems are personal computer based systems

  14. Operational benchmark for VVER-1000, unit 6, Kozloduy NPP

    International Nuclear Information System (INIS)

    Apostolov, T.; Petrov, B.

    1999-01-01

    Benchmark calculations have been carried out using the 3D nodal code TRAPEZ. Global neutron-physics characteristics of the VVER-1000 core, Kozloduy NPP Unit 6, have been determined taking into account the real loading patterns and operational history of the first three cycles. The code TRLOAD has been used to perform the fuel reloading between any two cycles. The reactor and components descriptions as well as material compositions are given. The results presented include the critical boric acid concentration, the radial power distribution, the axial power distribution for the maximum overload assembly, and the burnup distribution at three different moments during each cycle. Calculated values have been compared with measured data. It is shown that the results obtained by the TRAPEZ code are in good agreement with the experimental data. The information presented could serve as a test case for validation of code packages designed for analyzing the steady-state operation of VVERs. (author)

  15. Modernization and power upgrading of the Loviisa NPP

    International Nuclear Information System (INIS)

    Keskinen, A.

    1997-01-01

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.)

  16. Modernization and power upgrading of the Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Keskinen, A. [IVO Power Engineering Ltd., Vantaa (Finland)

    1997-12-31

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.). 4 refs.

  17. Modernization and power upgrading of the Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Keskinen, A [IVO Power Engineering Ltd., Vantaa (Finland)

    1998-12-31

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.). 4 refs.

  18. Risk management solutions for Cernavoda Unit #2 NPP completion

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.

    2002-01-01

    The greatest risk facing today's electric utilities is change. Utility risk managers are being challenged to address the changes of deregulation, new technologies and changing work force. The utilities must be more aware of where all its costs are located to face with the challenge of competition, forcing them to respond with lower prices and innovative services. For completion of large projects, like Cernavoda NPP, Unit 2, the utilities are facing also with certain specific risks: politic, economic, social. The natural perils or machinery breakdown are common risks for operation as well as for construction-commissioning projects. Beyond the explicit challenges associated with the completion of a nuclear power plant in a transition economy environment, the utilities are facing with new risk factors such as professional liability, political risk, product warranty and liability, international exposure, etc. Changes in other governmental policies are also affecting large projects, mentioning healthcare, workplace safety, workers' compensation, environmental clean up, etc.(author)

  19. Methodical recommendations for power unit comprehensive engineering and radiation survey

    International Nuclear Information System (INIS)

    Nosovskij, A.V.

    2000-01-01

    The article describes power unit radiation survey methods developed and applied during conduction of Ch NPP unit I Comprehensive Engineering Radiation Survey. Special requirements for units under decommissioning, main survey principals, criteria for definition of volume and the order of survey for various systems of a NPP Unit are included

  20. To the problem of reliability standardization in computer-aided manufacturing at NPP units

    International Nuclear Information System (INIS)

    Yastrebenetskij, M.A.; Shvyryaev, Yu.V.; Spektor, L.I.; Nikonenko, I.V.

    1989-01-01

    The problems of reliability standardization in computer-aided manufacturing of NPP units considering the following approaches: computer-aided manufacturing of NPP units as a part of automated technological complex; computer-aided manufacturing of NPP units as multi-functional system, are analyzed. Selection of the composition of reliability indeces for computer-aided manufacturing of NPP units for each of the approaches considered is substantiated

  1. Some problems connected with the Chernobyl NPP Unit 4 Accident

    International Nuclear Information System (INIS)

    Bar'yakhtar, V.G.

    1994-01-01

    The description of the eruption of radionuclides caused by the Chernobyl NPP Unit 4 Accident, including the effective time of the accident, quality and quantity of radio waste, is presented. A particular attention is given to the spotty structure of Chernobyl's contamination. The assumption that the spots distribution may be a consequence of the turbulent processes in the atmosphere is made

  2. Specific aspects for Cernavoda - Unit 1 NPP life assurance

    International Nuclear Information System (INIS)

    Rucareanu, R.

    2002-01-01

    systems/components; availability criteria - components and structures whose failure can cause a shut down or a reduction of power of the plant. The critical components and structures are of two categories: long-life passive components - Calandria vessel, Calandria internals, fuel channels, steam generators, reactor cooling pipes, pressurizer, containment building, concrete and steel structures, pressure vessels, heat exchangers, cables; short life active components - reactivity mechanisms, turbine, generator, diesel generator, pumps, valves, motors, air compressors, fans, instrumentation and control systems, electrical systems. For these components and structures, the potential degradation mechanisms must be identified and a safety margin defined. The next step is to estimate the actual ageing of these structures and components. This can be done by reviewing the design and the history of fabrication, installation, operation and maintenance. Good records and a database of operating conditions are essential. Periodic inspections (such as in-service, containment components, etc) results give also important information for evaluating the ageing degree. Main Activities ageing studies for Cernavoda NPP - Unit 1 began in 1994. They referred to the improvement of knowledge about ageing mechanisms, the selection of critical components, data collection and data processing. Also a special programme for Environmental Qualification up-dating has been developed by the owner of the plant. The installation of a multi-channel Data Acquisition System at Cernavoda NPP - Unit 1 is the scope of an ongoing IAEA Programme (ROM 04/027). The first steps of a Plant Life Management Programme started this year. The main proposed goals of the PLIM programme are: to review the existing records regarding the history of the critical components and structures (design, fabrication, installation, preservation, operation conditions, maintenance) in order to establish a reference database; to estimate the

  3. The Bohunice NPP V-1 units nuclear safety upgrading

    International Nuclear Information System (INIS)

    Mlcuch, M.

    2000-01-01

    Safety upgrading and operational reliability improvement was carried out by the Bohunice NPP V-1 staff continuously since the plant commissioning. By now, more than 1200 minor or major modifications have been implemented, either by the NPP maintenance staff or by the contractors. Based on findings of safety assessment missions invited by Bohunice NPP in 1990 - 1991, the Czecho-slovak Nuclear Regulatory Authority (CSKAE) issued the decision No. 5/91 of 81 safety upgrading measures to be taken in different areas. These improvements are referred to as the 'Small Reconstruction of the Bohunice V-1 NPP'. Realization of measures during Small reconstruction of the Bohunice NPP V-1 became a power plant, which further operation is acceptable from safety point of view, but it is also necessary further safety improvement. During the period of the Small Reconstruction the development of a Safety Report for the Gradual reconstruction has been completed. Based on this report the SR Nuclear Regulatory Authority issued the Decision No. 1/94, in which requires 59 upgrading measures in different areas to be addressed. The development of Basic Engineering of the Gradual Reconstruction has been contracted to the Siemens AG. Implementation of safety measures are provided through contract with the consortium REKON (which consists of Siemens AG company and Nuclear Power Plants Research Institute Trnava) and other Czech, Russian and Slovak companies. The Gradual Reconstruction of Bohunice NPP V-1 will be finished in 2000. By implementation of the measures carried out during Gradual Reconstruction achievement of an internationally acceptable nuclear safety level will be reached. (author)

  4. Uninterruptible power supply model of independent voltage inverter of NPP electrical equipment

    International Nuclear Information System (INIS)

    Rozhkov, V.V.; Ajdaralieva, V.Eh.

    2010-01-01

    A package of main transforming units models of advanced uninterruptible power supply systems of NPP electrical equipment was developed. The package of models allows investigating the basic modes of uninterruptible power supply systems operation by computer modeling. Simulation results were presented. Recommendations on choice of parameters of power circuit elements as well as on diagnostics and adjustment of regulators of converters control systems were given [ru

  5. Integrated risk assessment for multi-unit NPP sites—A comparison

    International Nuclear Information System (INIS)

    Kumar, C. Senthil; Hassija, Varun; Velusamy, K.; Balasubramaniyan, V.

    2015-01-01

    Highlights: • Framework for integrated risk assessment for multi-unit NPP sites. • Categorization of external and internal events. • Modelling of key issues: mission time, cliff-edge, common cause failures, etc. • Safety goals for multi-unit NPP sites. • Comparison of site core damage frequency in one, two, three and four unit sites. - Abstract: Most of the nuclear power producing sites in the world houses multiple units. Such sites are faced with hazards generated from external events: earthquake, tsunami, flood, etc. and can threaten the safety of nuclear power plants. Further, risk from a multiple unit site and its impact on the public and environment was evident during the Fukushima nuclear disaster in March 2011. It is therefore important to evolve a methodology to systematically assess the risk from multi-unit site. For a single unit site, probabilistic risk assessment technique identifies the potential accident scenarios, their consequences, and estimates the core damage frequency that arise due to internal and external hazards. This challenging task becomes even more complex for a multiple unit site, especially when the external hazards that has the potential to generate one or more correlated hazards or a combination of non-correlated hazards are to be modelled. This paper presents an approach to evaluate risk for multiple NPP sites and also compare the risk for sites housing single, double and multiple nuclear plants.

  6. Integrated risk assessment for multi-unit NPP sites—A comparison

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, C. Senthil, E-mail: cskumar@igcar.gov.in [AERB-Safety Research Institute, Kalpakkam (India); Hassija, Varun; Velusamy, K. [Reactor Design Group, Indira Gandhi Centre for Atomic Research, Kalpakkam (India); Balasubramaniyan, V. [AERB-Safety Research Institute, Kalpakkam (India)

    2015-11-15

    Highlights: • Framework for integrated risk assessment for multi-unit NPP sites. • Categorization of external and internal events. • Modelling of key issues: mission time, cliff-edge, common cause failures, etc. • Safety goals for multi-unit NPP sites. • Comparison of site core damage frequency in one, two, three and four unit sites. - Abstract: Most of the nuclear power producing sites in the world houses multiple units. Such sites are faced with hazards generated from external events: earthquake, tsunami, flood, etc. and can threaten the safety of nuclear power plants. Further, risk from a multiple unit site and its impact on the public and environment was evident during the Fukushima nuclear disaster in March 2011. It is therefore important to evolve a methodology to systematically assess the risk from multi-unit site. For a single unit site, probabilistic risk assessment technique identifies the potential accident scenarios, their consequences, and estimates the core damage frequency that arise due to internal and external hazards. This challenging task becomes even more complex for a multiple unit site, especially when the external hazards that has the potential to generate one or more correlated hazards or a combination of non-correlated hazards are to be modelled. This paper presents an approach to evaluate risk for multiple NPP sites and also compare the risk for sites housing single, double and multiple nuclear plants.

  7. Project No. 7 - Decommissioning unit at Ignalina NPP. (Engineering and project management)

    International Nuclear Information System (INIS)

    2000-01-01

    In order to manage decommissioning process at Ignalina NPP, a new unit should be established in the framework of the Ignalina NPP organizational structure. The on-site Engineering Project Management Unit (PMU) will adopt an integrated approach to project management , engineering design, planning, procurement, safety and licensing activities at Ignalina NPP site. The PMU will assist the Ignalina NPP management in the development of an integrated decommissioning and waste management strategy

  8. Life extension program of KORI Unit 1 NPP in Korea

    International Nuclear Information System (INIS)

    Hong, Sun-Yull

    1998-01-01

    The two phases of Life extension program for KORI Unit 1 NPP are presented. Phase I is completed. It was concluded that life extension is a feasible option in technical and economic aspects. Detailed analysis of RPV is underway, plan for Phase II is finished. It deals with screening and sorting of all relevant SSCs, detailed life evaluation of SSCs, ageing management program and documentation for license renewal application

  9. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 3G. Kozloduy NPP units 5/6: Analysis and testing. Working material

    International Nuclear Information System (INIS)

    1999-01-01

    In August 1991, following the SMiRT-11 Conference in Tokyo, a Technical Committee Meeting was held on the 'Seismic safety issues relating to existing NPPs'. The Proceedings of this TCM was subsequently compiled in an IAEA Working Material. One of the main recommendations of this TCM, called for the harmonization of criteria and methods used in Member States in seismic reassessment and upgrading of existing NPPs. Twenty four institutions from thirteen countries participated in the CRP named 'Benchmark study for the seismic analysis and testing of WWER type NPPs'. Two types of WWER reactors (WWER-1000 and WWER-440/213) selected for benchmarking. Kozloduy NPP Units 5/6 and Paks NPP represented these respectively as prototypes. Consistent with the recommendations of the TCM and the working paper prepared by the subsequent Consultants' Meeting, the focal activity of the CRP was the benchmarking exercises. A similar methodology was followed both for Paks NPP and Kozloduy NPP Unit 5. Firstly, the NPP (mainly the reactor building) was tested using a blast loading generated by a series of explosions from buried TNT charges. Records from this test were obtained at several free field locations (both downhole and surface), foundation mat, various elevations of structures as well as some tanks and the stack. Then the benchmark participants were provided with structural drawings, soil data and the free field record of the blast experiment. Their task was to make a blind prediction of the response at preselected locations. The analytical results from these participants were then compared with the results from the test. Although the benchmarking exercises constituted the focus of the CRP, there were many other interesting problems related to the seismic safety of WWER type NPPs which were addressed by the participants. These involved generic studies, i.e. codes and standards used in original WWER designs and their comparison with current international practice; seismic analysis

  10. Prestart-up hydrogen peroxide solution washing of NPP unit with the RBMK-type reactor

    International Nuclear Information System (INIS)

    Gruzdev, N.I.; Man'kina, N.N.; Al'tshuller, M.A.

    1979-01-01

    Presented are the results of industrial hydrogen peroxide solution washing of condensating-feed system conducted on the second unit of the Kursk NPP. Duration of the washing constituted 8 hours. The hydrogen peroxide concentration during first 4 hours was 10-20 mg/kg at a flow rate of 260 m 2 /h, during the following 4 hours it constituted 2-5 mg/kg at a flow rate of 1000 m 3 /h. It is found out that prestart-up hydrogen peroxide washing of NPP power units with the RBMK-type reactor permits: to simplify essentially the technology and scheme of washing process; to reduce a flow rate of desalt washing water; to except environmental contamination with washing solutions and reagents being neutralized; to reduce the time of washing process; to reduce the time necessary for the achievement of reference water condition factors, and to increase the unit reliability and to improve a radiation situation

  11. Fuel assembly leakage, unit 4, cycle 22, Paks NPP

    International Nuclear Information System (INIS)

    Szecsenyi, C.; Burjan, T.; Torma, B.; Bona, G.

    2009-01-01

    At the beginning of Cycle 22, Unit 4, Paks NPP the Iodine isotopes activity concentrations raised irregularly in the water of the primary circuit. Analysis supposed that from 1 to 10 fuel rods in one or more newly loaded follower assemblies had lost their integrity. Due to the fact it was not necessary to shut down the reactor, but at the end of the cycle sipping tests were performed for the entire core to find out the facts using a telescope sipping device supplied by H and B Co., Germany. This paper describes the circumstances of the emergence of the problem, the operational inspection and limitation rules in Paks NPP, the theoretical analysis to estimate the scope and kind of the problem, the sipping device and the measurement/evaluation methods applied for the practical tests, fulfilment the tests, the results and their evaluation and the conclusions regarding the event. (Authors)

  12. Fuel assembly leakage, Unit 4, Cycle 22, Paks NPP

    International Nuclear Information System (INIS)

    Szecsenyi, Z.; Burjan, T.; Torma, B.; Bona, G.

    2009-01-01

    At the beginning of Cycle 22, Unit 4, Paks NPP the Iodine isotopes activity concentrations raised irregularly in the water of the primary circuit. Analysis supposed that from 1 to 10 fuel rods in one or more newly loaded follower assemblies had lost their integrity. Due to the fact it was not necessary to shut down the reactor, but at the end of the cycle sipping tests were performed for the entire core to find out the facts using a telescope sipping device supplied by H and B Co., Germany. This paper describes the circumstances of the emergence of the problem, the operational inspection and limitation rules in the Paks NPP, the theoretical analysis to estimate the scope and kind of the problem, the sipping device and the measurement/evaluation methods applied for the practical tests, fulfilment the tests, the results and their evaluation and the conclusions regarding the event. (authors)

  13. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 3H. Kozloduy NPP units 5/6: Analysis and testing. Working material

    International Nuclear Information System (INIS)

    1999-01-01

    In August 1991, following the SMiRT-11 Conference in Tokyo, a Technical Committee Meeting was held on the 'Seismic safety issues relating to existing NPPs'. The Proceedings of this TCM was subsequently compiled in an IAEA Working Material. One of the main recommendations of this TCM, called for the harmonization of criteria and methods used in Member States in seismic reassessment and upgrading of existing NPPs. Twenty four institutions from thirteen countries participated in the CRP named 'Benchmark study for the seismic analysis and testing of WWER type NPPs'. Two types of WWER reactors (WWER-1000 and WWER-440/213) selected for benchmarking. Kozloduy NPP Units 5/6 and Paks NPP represented these respectively as prototypes. Consistent with the recommendations of the TCM and the working paper prepared by the subsequent Consultants' Meeting, the focal activity of the CRP was the benchmarking exercises. A similar methodology was followed both for Paks NPP and Kozloduy NPP Unit 5. Firstly, the NPP (mainly the reactor building) was tested using a blast loading generated by a series of explosions from buried TNT charges. Records from this test were obtained at several free field locations (both downhole and surface), foundation mat, various elevations of structures as well as some tanks and the stack. Then the benchmark participants were provided with structural drawings, soil data and the free field record of the blast experiment. Their task was to make a blind prediction of the response at preselected locations. The analytical results from these participants were then compared with the results from the test. Although the benchmarking exercises constituted the focus of the CRP, there were many other interesting problems related to the seismic safety of WWER type NPPs which were addressed by the participants. These involved generic studies, i.e. codes and standards used in original WWER designs and their comparison with current international practice; seismic analysis

  14. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 3F. Kozloduy NPP units 5/6: Analysis and testing. Working material

    International Nuclear Information System (INIS)

    1999-01-01

    In August 1991, following the SMiRT-11 Conference in Tokyo, a Technical Committee Meeting was held on the 'Seismic safety issues relating to existing NPPs'. The Proceedings of this TCM was subsequently compiled in an IAEA Working Material. One of the main recommendations of this TCM, called for the harmonization of criteria and methods used in Member States in seismic reassessment and upgrading of existing NPPs. Twenty four institutions from thirteen countries participated in the CRP named 'Benchmark study for the seismic analysis and testing of WWER type NPPs'. Two types of WWER reactors (WWER-1000 and WWER-440/213) selected for benchmarking. Kozloduy NPP Units 5/6 and Paks NPP represented these respectively as prototypes. Consistent with the recommendations of the TCM and the working paper prepared by the subsequent Consultants' Meeting, the focal activity of the CRP was the benchmarking exercises. A similar methodology was followed both for Paks NPP and Kozloduy NPP Unit 5. Firstly, the NPP (mainly the reactor building) was tested using a blast loading generated by a series of explosions from buried TNT charges. Records from this test were obtained at several free field locations (both downhole and surface), foundation mat, various elevations of structures as well as some tanks and the stack. Then the benchmark participants were provided with structural drawings, soil data and the free field record of the blast experiment. Their task was to make a blind prediction of the response at preselected locations. The analytical results from these participants were then compared with the results from the test. Although the benchmarking exercises constituted the focus of the CRP, there were many other interesting problems related to the seismic safety of WWER type NPPs which were addressed by the participants. These involved generic studies, i.e. codes and standards used in original WWER designs and their comparison with current international practice; seismic analysis

  15. Full scale dynamic testing of Kozloduy NPP unit 5 structures

    International Nuclear Information System (INIS)

    Da Rin, E.M.

    1999-01-01

    As described in this report, the Kozloduy NPP western site has been subjected to low level earthquake-like ground shaking - through appropriately devised underground explosions - and the resulting dynamic response of the NPP reactor Unit 5 important structures appropriately measured and digitally recorded. In-situ free-field response was measured concurrently more than 100 m aside the main structures of interest. The collected experimental data provide reference information on the actual dynamic characteristics of the Kozloduy NPPs main structures, as well as give some useful indications on the dynamic soil-structure interaction effects for the case of low level excitation. Performing the present full-scale dynamic structural testing activities took advantage of the experience gained by ISMES during similar tests, lately performed in Italy and abroad (in particular, at the Paks NPP in 1994). The IAEA promoted dynamic testing of the Kozloduy NPP Unit 5 by means of pertinently designed buried explosion-induced ground motions which has provided a large amount of data on the dynamic structural response of its major structures. In the present report, the conducted investigation is described and the acquired digital data presented. A series of preliminary analyses were undertaken for examining in detail the ground excitation levels that were produced by these weak earthquake simulation experiments, as well as for inferring some structural characteristics and behaviour information from the collected data. These analyses ascertained the high quality of the collected digital data. Presumably due to soil-structure dynamic interaction effects, reduced excitation levels were observed at the reactor building foundation raft level with respect to the concurrent free-field ground motions. measured at a 140 m distance from the reactor building centre. Further more detailed and systematic analyses are worthwhile to be performed for extracting more complete information about the

  16. Novelly formed products of the interaction of fuel with construction materials of the 4th unit of Chernobyl NPP

    International Nuclear Information System (INIS)

    Borovoj, A.A.; Galkin, B.Ya.; Krinitsyn, A.P.; Pazukhin, Eh.M.; Kheruvimov, A.N.; Chechcherov, K.P.; Anderson, E.B.

    1991-01-01

    Radiation environment and map of sampling route in the steam distributing collector of the 4th unit of the Chernobyl NPP are described. The results of gamma- and alpha radiometric analyses as well as chemical analysis are presented. Samples of core materials taken from the depth of fuel-containing masses by drilling through reactor vault wall of the damaged power unit are described

  17. International benchmark for coupled codes and uncertainty analysis in modelling: switching-Off of one of the four operating main circulation pumps at nominal reactor power at NPP Kalinin unit 3

    International Nuclear Information System (INIS)

    Tereshonok, V. A.; Nikonov, S. P.; Lizorkin, M. P.; Velkov, K; Pautz, A.; Ivanov, V.

    2008-01-01

    The paper briefly describes the Specification of an international NEA/OECD benchmark based on measured plant data. During the commissioning tests for nominal power at NPP Kalinin Unit 3 a lot of measurements of neutron and thermo-hydraulic parameters have been carried out in the reactor pressure vessel, primary and the secondary circuits. One of the measured data sets for the transient 'Switching-off of one Main Circulation Pump (MCP) at nominal power' has been chosen to be applied for validation of coupled thermal-hydraulic and neutron-kinetic system codes and additionally for performing of uncertainty analyses as a part of the NEA/OECD Uncertainty Analysis in Modeling Benchmark. The benchmark is opened for all countries and institutions. The experimental data and the final specification with the cross section libraries will be provided to the participants from NEA/OECD only after official declaration of real participation in the benchmark and delivery of the simulated results of the transient for comparison. (Author)

  18. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 3I. Kozloduy NPP units 5/6: Analysis and testing. Working material

    International Nuclear Information System (INIS)

    1999-01-01

    In August 1991, following the SMiRT-11 Conference in Tokyo, a Technical Committee Meeting was held on the 'Seismic safety issues relating to existing NPPs'. The Proceedings of this TCM was subsequently compiled in an IAEA Working Material. One of the main recommendations of this TCM, called for the harmonization of criteria and methods used in Member States in seismic reassessment and upgrading of existing NPPs. Twenty four institutions from thirteen countries participated in the CRP named 'Benchmark study for the seismic analysis and testing of WWER type NPPs'. Two types of WWER reactors (WWER-1000 and WWER-440/213) selected for benchmarking. Kozloduy NPP Units 5/6 and Paks NPP represented these respectively as prototypes. Consistent with the recommendations of the TCM and the working paper prepared by the subsequent Consultants' Meeting, the focal activity of the CRP was the benchmarking exercises. A similar methodology was followed both for Paks NPP and Kozloduy NPP Unit 5. Firstly, the NPP (mainly the reactor building) was tested using a blast loading generated by a series of explosions from buried TNT charges. Records from this test were obtained at several free field locations (both downhole and surface), foundation mat, various elevations of structures as well as some tanks and the stack. Then the benchmark participants were provided with structural drawings, soil data and the free field record of the blast experiment. Their task was to make a blind prediction of the response at preselected locations. The analytical results from these participants were then compared with the results from the test. Although the benchmarking exercises constituted the focus of the CRP, there were many other interesting problems related to the seismic safety of WWER type NPPs which were addressed by the participants. These involved generic studies, i.e. codes and standards used in original WWER designs and their comparison with current international practice; seismic analysis

  19. Preparation status for continuous operation of Kori unit 1 NPP in Korea

    International Nuclear Information System (INIS)

    Choi, C.H. . E-mail : chechee@khnp.co.kr

    2005-01-01

    Kori unit 1 Nuclear Power Plant is the first commercial operation plant in Korea. In Korea, the life extension of NPP beyond design lifetime reached practically application stage. Preparations status for continuous operation of Kori unit 1, Many researches have demonstrated that life extension beyond design lifetime is possible in terms of technology. This paper is to introduce and to share the continuous operation preparations status and schedule for Kori unit 1 License Renewal Process an additional every 10 years beyond the design life 30 years term. (author)

  20. To question of NPP power reactor choice for Kazakhstan

    International Nuclear Information System (INIS)

    Batyrbekov, G.A.; Makhanov, Y.M.; Reznikova, R.A.; Sidorenco, A.V.

    2004-01-01

    Full text: The requirements to NPP power reactors that will be under construction in Kazakhstan are proved and given in the report. A comparative analysis of the most advanced projects of power reactors with light and heavy water under pressure of large, medium and low power is carried out. Different reactors have been considered as follows: 1. Reactors with high-power (700 MW(el) and up) such as EPR, French - German reactor; CANDU-9, Canadian heavy-water reactor; System 80+, developed by ABB Combustion Engineering company, USA; KNGR, Korean reactor of the next generation; APWR, Japanese advanced reactor; WWER-1000 (V-392) - development of Atomenergoproect /Gydropress, Russian Federation; EP 1000, European passive reactor. 2. Reactors with medium power (300 MW (el) - 700 MW (el): AP-600, passive PWR of the Westinghouse company; CANDU-6, Canadian heavy-water reactor; AC-600, Chinese passive PWR; WWER-640, Russian passive reactor; MS-600 Japanese reactor of Mitsubishi Company; KSNP-600, South Korean reactor. 3. Reactors with low power (a few MW(el)- 300 MW(el)): IRIS, reactor of IV generation, developed by the International Corporation of 13 organizations from 7 countries, SMART, South Korean integrated reactor; CAREM, Argentina integrated reactor; MRX, Japanese integrated reactor; 'UNITERM', Russian NPP with integrated reactor, development of NIKIET; AHEC-80, Russian NPP, developed by OKBM. A comparison of the projects of the above-mentioned power reactors was carried out with respect to 15 criteria of nuclear, radiating, ecological safety and economic competitiveness, developed especially for this case. Data on a condition and prospects of power production and power consumption, stations and networks in Kazakhstan necessary for the choice of projects of NPP reactors for Kazakhstan are given. According to the data a balance of power production and power consumption as a whole in the country was received at the level of 59 milliard kw/h. However, strong dis balance

  1. To question of NPP power reactor choice for Kazakhstan

    International Nuclear Information System (INIS)

    Batyrbekov, G.A.; Makhanov, Y.M.; Reznikova, R.A.; Sidorenco, A.V.

    2004-01-01

    The requirements to NPP power reactors that will be under construction in Kazakhstan are proved and given in the report. A comparative analysis of the most advanced projects of power reactors with light and heavy water under pressure of large, medium and low power is carried out. Different reactors have been considered as follows: 1. Reactors with high-power (700 MW(el) and up) such as EPR, French - German reactor; CANDU-9, Canadian heavy-water reactor; System 80+, developed by ABB Combustion Engineering company, USA; KNGR, Korean reactor of the next generation; APWR, Japanese advanced reactor; WWER-1000 (V-392) - development of Atomenergoproect /Gydropress, Russian Federation; EP 1000, European passive reactor. 2. Reactors with medium power (300 MW (el) - 700 MW (el): AP-600, passive PWR of the Westinghouse company; CANDU-6, Canadian heavy-water reactor; AC-600, Chinese passive PWR; WWER-640, Russian passive reactor; MS-600 Japanese reactor of Mitsubishi Company; KSNP-600, South Korean reactor. 3. Reactors with low power (a few MW(el)- 300 MW(el)): IRIS, reactor of IV generation, developed by the International Corporation of 13 organizations from 7 countries, SMART, South Korean integrated reactor; CAREM, Argentina integrated reactor; MRX, Japanese integrated reactor; 'UNITERM', Russian NPP with integrated reactor, development of NIKIET; AHEC-80, Russian NPP, developed by OKBM. A comparison of the projects of the above-mentioned power reactors was carried out with respect to 15 criteria of nuclear, radiating, ecological safety and economic competitiveness, developed especially for this case. Data on a condition and prospects of power production and power consumption, stations and networks in Kazakhstan necessary for the choice of projects of NPP reactors for Kazakhstan are given. According to the data a balance of power production and power consumption as a whole in the country was received at the level of 59 milliard kw/h. However, strong dis balance in the

  2. Analysis of the foreign systems for classification and marking the NPP unit components during their application in information systems

    International Nuclear Information System (INIS)

    Bylkin, B.K.; Shaposhnikov, V.A.; Sadovoj, Yu.K.; Tikhonovskij, V.L.; Chujko, D.V.

    2006-01-01

    Procedures accepted and permitted in an information system (IS) to arrange and to rank information drawn up to ensure the information support of decommissioning of an NPP power unit affect the application convenience and efficiency of the IS taken as a whole. The IS supporting the decommissioning efforts stores large volume of information, that is why, the problem to choose systems to ensure information ranking is the urgent one. The paper deals with the analysis of the foreign systems to rank the components used during an NPP operation. Besides, one considers the application of the mentioned systems to arrange and to rank the information on decommissioning of an NPP power unit presented to users [ru

  3. Determination of reactor parameters during start up test at the Taiwan NPP, Unit 1

    International Nuclear Information System (INIS)

    Astakhov, S.; Kravchenko, A.; Kraynov, Ju.; Nasedkin, A.; Tsyganov, S.

    2006-01-01

    Unit 1 of Taiwan NPP with WWER-1000 reactor reached the first criticality at December 20 of 2005. Series of start up experiments were carried out under scientific advisory of RRC 'Kurchatov Institute' specialists. At the Hot Zero Power state the reactivity coefficients, control rod group and scram worth were measured and symmetry of the core loading and power reactivity effect due to reaching 1% of nominal were assessed. Paper describes in brief special features of experiments and presented some results obtained at a measurements (Authors)

  4. Diversity of microflora at the fourth destroyed unit of the ChNPP

    International Nuclear Information System (INIS)

    Parenyuk, O.Yu.; Shavanova, K.Je.; Yilljenko, V.V.; Gudkov, Yi.M.; Nanba, K.; Takasi, T.; Syimutyin, Yi.O.; Samofalova, D.O.; Ribalka, V.B.

    2017-01-01

    DNA of the substrate, sampled from six points in the destroyed 4-th power unit of ChNPP, where the dose rate on the microorganisms ranges from 0.008 to 0.12 Gy/h, was analyzed by New Generation Sequencing technology. It was found that the most diverse and stable microbiome occurs in sample, located outside of the ''Ukryttya'' object on the industrial site (conditional control). There are no dominants in it, which means that it is the most balanced and approximate to the general state of the soil microbiome of ecosystems surrounding the ChNPP. As for the sample, taken from the spot, where the dose rate was the highest, total number of species represented appeared eight times smaller, but dominance index was the highest, which indicates the formation of distinct microbiome dominants.

  5. Actual status of project Mochovce NPP units 3 and 4 completion

    International Nuclear Information System (INIS)

    Niznan, S.

    2005-01-01

    In this presentation author deals with actual status of project Mochovce NPP units 3 and 4 completion. Present state of Mochovce NPP, Units 3 and 4 enables real assumption to completion. It is expected that such supplier companies can be used which are experienced in field of nuclear projects. Based on budget of 2002, it seems that completion costs of 45 billions SKK are real. These figures were confirmed by study performed by TRACTEBEL in 2004. Based on experience from Bohunice NPP completion as well as from Mochovce NPP, Units 1 and 2 completion and if decision milestone and project start up deadlines will be observed according to modified preliminary schedule of Mochovce NPP Units 3 and 4 completion, it seems as real that Unit 3 will be completed till 06/2011 and Unit 4 - till 12/2011.

  6. Redundant filtration system of the fuel buildings,units 1 and 2 Almaraz NPP

    International Nuclear Information System (INIS)

    Lopez Tanco, J.

    2011-01-01

    The project redundant filtering fuel buildings in units 1 and 2 of Almaraz NPP, will compliance to the requirements established in the complementary technical instructions to the authorization of exploitation of Almaraz NPP, established by the CSN and will consist of the installation of a new filtration unit.

  7. Implementing the Environmental Management System ISO 14001 at the Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Jelev, Adrian

    2003-01-01

    An environmental management plan (EMP) has been developed for the Cernavoda NPP Unit 1. It contains the necessary components for identification and management of the environmental aspects of NPP. The environmental policy of the 'Nuclearelectrica' National Society and the associated EMP are the basis for the Environment Management System that will be implemented at Cernavoda NPP. The final step of this process will be the ISO 14001 certification. This paper points out to the main aspects concerning the implementation of the ISO 14001 system at Cernavoda NPP Unit 1. (author)

  8. Results from probabilistic safety analysis level 2 for Kozloduy NPP units 3 and 4

    International Nuclear Information System (INIS)

    Velev, V.; Mancheva, K.

    2006-01-01

    The study considers full power operation analysis results and impact of strategies and modernisation implementations of Kozloduy NPP units 3 and 4. In this paper the following issues are discussed: the development of Severe Accident Management Guidelines and Symptom Based Emergency Operating Procedures, installation of brand new system as Emergency Filter Ventilation System, Passive Autocatalytic Hydrogen recombiners, etc. In order to respond to the objectives of the study, the analyses assets the impact of different initiating events on risk based on the frequencies of various plant damage states, the confinement failure and the radiological release frequencies and finally estimates the total risk as frequency of radiological releases

  9. Numerical Simulation of Measurements during the Reactor Physical Startup at Unit 3 of Rostov NPP

    Science.gov (United States)

    Tereshonok, V. A.; Kryakvin, L. V.; Pitilimov, V. A.; Karpov, S. A.; Kulikov, V. I.; Zhylmaganbetov, N. M.; Kavun, O. Yu.; Popykin, A. I.; Shevchenko, R. A.; Shevchenko, S. A.; Semenova, T. V.

    2017-12-01

    The results of numerical calculations and measurements of some reactor parameters during the physical startup tests at unit 3 of Rostov NPP are presented. The following parameters are considered: the critical boron acid concentration and the currents from ionization chambers (IC) during the scram system efficiency evaluation. The scram system efficiency was determined using the inverse point kinetics equation with the measured and simulated IC currents. The results of steady-state calculations of relative power distribution and efficiency of the scram system and separate groups of control rods of the control and protection system are also presented. The calculations are performed using several codes, including precision ones.

  10. Level 1 PSA study of Mochovce unit 1 NPP (SM AA 10 and 08)

    International Nuclear Information System (INIS)

    Cillik, I.

    1997-01-01

    This paper presents genesis of Level 1 PSA project preparation for all operational modes of Mochovce NPP unit 1 including the description of its' main objectives, scope and working method. The PSA study which includes full power (FPSA) as well as shutdown and low power conditions (SPSA) Level 1 PSA has to support the nuclear safety improvements of the unit. They evaluate the basic design and the benefits of all improvements, which were found necessary to be incorporated before the start-up of the unit. The study includes internal events (transients and under-loss of coolant accident, LOCAs), internal hazards as fires and floods and selected external hazards as earthquake, influence of external industry, extreme meteorological conditions and aircraft crash.The PSA (both FPSA and SPSA) models is developed using the RISK SPECTRUM PSA code. (author)

  11. Commissioning tests at Bohunice NPP V1 unit 2 after reconstruction in 1998

    International Nuclear Information System (INIS)

    Pajtinka, A.; Tvaroska, V.; Wiening, K.-H.; Mueller, B.

    2000-01-01

    The last and the most extensive stage in the reconstruction project of the Bohunice NPP started in July 1998. The main activities performed during a 6-month scheduled unit 2 outage included: - Installation of a new emergency core cooling system with an increased capacity according to the defined broader break spectrum for LOCA; - Reconstruction of the existing confinement spray system and installation of a new confinement pressure suppression system; - Completion of upgrading measures to increase the reliability of emergency power supply systems (replacement of low voltage switchgear, installation of new cabling for all loads important to safety, installation of new motor-generators and rectifier sets); - Connection to the plant and commissioning of the new reactor protection system. Comprehensive tests and checks performed on completion of installation work on the modified mechanical, electrical and I and C systems were important reasons for the absence of major problems during restart of the unit after the several project implementation phases. Operating experience at unit 2 since its recommissioning in January 1999 has confirmed that the required safety standards have been met and that operational reliability has been substantially increased at the sometime. Periodic testing is being performed in accordance with the limits and conditions for safe operation of Bohunice NPP. To date all these tests were completed without significant problems. The functions implemented in the new technology met the test program criteria, which were approved with authority, in all essential areas. Through the close cooperation of the partners involved and through the combined efforts of the various engineering and operating disciplines, technical and scheduling problems could be immediately identified and quickly resolved. In general, these kinds of projects require optimum cooperation among the parties involved. Modernization of the NPP Bohunice V1 unit 2 has shown, that all

  12. Response of the main building, unit 5, Kozloduy NPP (Bulgaria) to an explosion input motion

    International Nuclear Information System (INIS)

    Kostov, M.; Boncheva, H.; Varbanov, G.; Kaneva, A.; Stefanov, D.; Koleva, N.

    1999-01-01

    The main building of Unit 5, NPP Kozloduy is one of the two selected prototypes of WWER-type plants included in the project 'Benchmark study for seismic analysis and testing of WWER-type nuclear power plants', co-ordinated by IAEA. The dynamic in-situ testing of the structure of Unit 5 WWER-1000 MW reactor containment building and the adjacent auxiliary structures is performed by specialists of ISMES (Italy), assisted by Hungarian consultants (GEOPARD) and Bulgarian specialist of NPP Kozloduy. The aim of the experiment is to assess the dynamic characteristics and behaviour of the structures, the soil-structure interaction effects, the equipment-structure interaction, etc. The dynamic excitation is a low level ground motion induced by underground explosions. The measuring of the response is done at different pre-selected structure points. Two experiments are performed. The registrations during the second experiment of 01.07.1996 are used in the present report. One set of free field records are given up to the participant institutions for the benchmarking. The purpose is to perform a dynamic analysis of the main building of Unit 5, to assess the response to the explosion ground motion and to compare the analytical results with the recorded motion. In this report are discussed soil and structure modelling and computation results consisting in acceleration response spectra obtained at foundation level and at different points of the structure

  13. Neutron embrittlement of the Kozloduy NPP unit 1 reactor

    International Nuclear Information System (INIS)

    Vodenicharov, S.; Kamenova, Tz.

    1996-01-01

    Activities made in the period 1989-1996 according to the Program for metal state monitoring of the Kozloduy NPP Unit 1 are described. Data on P and Cu content in the welded joint 4 are reported. Determination is made by wet chemical analysis of shavings taken out from the inner side of the wall, direct spectral analysis of the vessel itself and spectroscopy of the inner and outer side of 6 templates. The results obtained from 4 different study teams showed a good agreement. The real average P content is 0.046% and tends to diminish in depth. Microstructural investigation does not show any expressed inter-crystalline mechanism of brittle failure at low temperatures. The data on real P and Cu content, as well as the experimental values of the initial critical temperature of embrittlement (Tk o ), the residual part of temperature shift (Tk r ) and the re-embrittlement temperature after annealing at 475 o (Tk) allow to predict the change in Tk o of the joint 4 during the next refueling cycles. The measured low value of Tk after 18-th refueling cycle is considerably lower than that forecasted by lateral re-embrittlement law. This means that the forecasting of Tk for the next cycles is made with big enough conservatisms, and that a second annealing of the vessel until 26-th cycle is not necessary. So according to the most conservative estimate, the Unit 1 can operate safely until the end of the 26-th refueling cycle. It is also concluded, that in terms of radiation degradation of the vessel metal the operation life time of the Unit 1 can reach and exceed the designed one. 2 tab., 7 ref

  14. Technical and economical problems of decommissioning nuclear power plants (NPP) in Russia

    International Nuclear Information System (INIS)

    Vaneev, M.

    2001-01-01

    The introduction per new century has brought to atomic Engineering many new problems. One of them, which has got a serious urgency, we now shall consider. It is a problem of decommissioning NPP in Russia. By 2014 all maintained nowadays NPP in Russian Federation will develop the regular service life. And all of them on idea should be removed from operation. But, as we understand, in today's difficult economic conditions, to it NPP the procedure of prolongation of service life will be applied, and where it is impossible by virtue of the various reasons, the procedure of translation NPP in nuclear - safe condition and in a mode of a long storage under supervision, before acceptance of the decision about a method and way of financing of a decommissioning will be applied. Possible the following variants will be: use platforms of the old NPP for construction new NPP, or using as burial place NPP. The variant of a decommissioning up to a condition 'green grass' is represented unprofitable because of its dearness. The similar decommissioning was carried out in Japan. Was removed from operation research reactor of a type WWR. The expenses for this method of a decommissioning considerably surpass expenses for a method of a burial place NPP basically because of high cost of dismantle and transportation in long-term storehouses of the 1 contour equipment. The most urgent problem of decommissioning NPP, which developed their regular service life - is financing this final stage of a exploitation cycle of the block. I shall remind, that the financing is carried out from uniform fund of decommissioning. The formation of this fund occurs by deduction 1.3 % of cost of the put electric power to the consumers by all maintained NPP of Russia. The expenditure of this fund is carried on time on some tens years. They are spent for 3 basic stages: preparation to decommissioning NPP, long endurance under supervision, dismantle and burial the NPP equipment. Nowadays on faculty NPP MPEI

  15. Search and Retrieval of Foreign Objects for the Steam Generator of Wolsung NPP Unit 1

    International Nuclear Information System (INIS)

    Jeong, Woo-Tae; Lee, Kyung-Ho

    2016-01-01

    We developed a foreign object search and retrieval (FOSAR) system for Wolsung NPP unit 1 steam generators. The steam generators of Wolsung NPP unit 1 have one 2.5 inch hand hole and two 4 inch hand holes. The FOSAR system was designed to be installed through 4 inch hand holes. Using permanent magnet, the FOSAR system was firmly attached to the vertical annulus wall of the steam generator. We successfully developed the FOSAR system for Wolsung NPP unit 1. Using the developed FOSAR system, technicians successfully found and removed various foreign objects. Most of the foreign objects, we found, were made of carbon steel sheet, therefore magnet tool was the most useful to remove it. Alligator tool was sometimes used. Based on the experience during the FOSAR activities, we are developing a lancing system for Wolsung NPP unit 1. It will be designed and manufactured until November 2016

  16. Search and Retrieval of Foreign Objects for the Steam Generator of Wolsung NPP Unit 1

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Woo-Tae; Lee, Kyung-Ho [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    We developed a foreign object search and retrieval (FOSAR) system for Wolsung NPP unit 1 steam generators. The steam generators of Wolsung NPP unit 1 have one 2.5 inch hand hole and two 4 inch hand holes. The FOSAR system was designed to be installed through 4 inch hand holes. Using permanent magnet, the FOSAR system was firmly attached to the vertical annulus wall of the steam generator. We successfully developed the FOSAR system for Wolsung NPP unit 1. Using the developed FOSAR system, technicians successfully found and removed various foreign objects. Most of the foreign objects, we found, were made of carbon steel sheet, therefore magnet tool was the most useful to remove it. Alligator tool was sometimes used. Based on the experience during the FOSAR activities, we are developing a lancing system for Wolsung NPP unit 1. It will be designed and manufactured until November 2016.

  17. Seismic upgrading of WWER 440-230 structures, units 1/2, Kozloduy NPP

    International Nuclear Information System (INIS)

    Stafanov, D.; Kostov, M.; Boncheva, H.; Varbanov, G.

    1995-01-01

    The purpose of this paper is to present final results from a big amount of computational work in connection with the investigations of the possibilities for upgrading of WWER 440-230 structures, units 1/2, Kozloduy NPP. (author)

  18. System for remote routine monitoring of power equipment at TPP and NPP

    International Nuclear Information System (INIS)

    Kantsedalov, V.G.; Samojlenko, V.P.; Doroshenko, V.A.

    1988-01-01

    A system for remote routine monitoring of TPP and NPP pipeline metals is described. The principal functional unit of the system is the unit of remote routine methods and techniques for studying and monitoring the metal and properties. The system is equipped with 5 types of routine monitoring equipment: robots, remote aggregated complexes, periodical diagnostic monitors, other means of metal diagnostics (endoscopes, introscopes). All current information enters the unit for estimating and forecasting the service life of power unit, where it is compared with the standard indices of reliability, duravility and efficiency. The system considered permits to reduce significantly or minimize the scope of works on metal monitoring during overhauls, increase intermonitoring and interrepairing compaigns to 8 years

  19. Study of environmental impact assessment for Mochovce NPP Units 3 and 4. Executive summary. September 2007

    International Nuclear Information System (INIS)

    Anon

    2007-09-01

    SE/ENEL, on a voluntary basis, has prepared new EIA Study for the completion of Units 3 and 4 of Mochovce Nuclear Power Plant (MO34 NPP) according to International current practices and European Directives. The results of the analysis, according to SE/ENEL Environment and Corporate Social Responsibility policies, will be provided to local Communities and Public Authorities. The Environmental Impact Assessment is performed: - in compliance with appendix 11 of Slovak Act. No. 24/2006 'On the assessment of the effects on the environment and on the modification and enlargement of some laws'; - meeting the requirements of the Exhibit II 'Illustrative list of potential social and environmental issues to be addressed in the Social and Environmental Assessment documentation' as reported in the document 'Equator Principles' of 2006 July developed by the International Finance Corporation (IFC). The area of Mochovce NPP is situated in Central Europe in the south-western region of the Slovak Republic (SR) at the western border of the Levice district. The area lies in the south-western part of the Kozmalovske hills mainly in the Hron highlands. From the point of view of the terrestrial and administrative organization of the SR, Mochovce NPP is situated in the eastern part of the Nitra region, in the north-western part of the Levice district, close to the border with the Nitra and Zlate Moravce districts. Mochovce NPP is approx. 12 km from the district capital Levice, which is the largest town within a 20 km distance from the power plant. Initial site preparation began in August 1983. In April 1998 the first fuel was loaded into Unit 1 of Mochovce NPP. The operation started in August 1998. Unit 2 started operation in January 2000. The original Construction Permit No. Vyst. 2010/86 for MO 34 was issued by the District National Committee in Levice on the basis of the Land Planning Decisions on 12 November 1986. This Permit has been renewed firstly on 5 May 1997 by letter of the

  20. Configuration management and change control at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Gheorghiu, Virgil

    1998-01-01

    Effective configuration management requires that: 1. the design basis of station structures, systems, equipment and components be maintained at all times; 2. only accurate and approved technical, operational and maintenance information is available for performance of station activities; 3. correct operating manuals, flowsheets, operating sequences, operating task and training manuals are prepared and maintained currently. Design Engineering at Cernavoda NPP is primarily the responsibility of the Engineering Services Department supported if necessary by the Technical Unit. The key elements needed to achieve excellence in design engineering support for station operation, including design process and implementation of modification are investigated by answering the questions: 1. What is the station expectation for design change control?; 2. How is this provided?. Concerning design, the following aspects are stressed: Detailed Design Development; Design Verification; Design Change Implementation. The present design process is auditable and well documented. It consists of detailed design development, and design output documents such as applicable drawings, procurement specifications, installation and test requirement and the results of design and safety reviews. The design change implementation does not proceed until an Inspection Test Plan has been developed and approved as required. (author)

  1. Application of GO methodology in reliability analysis of offsite power supply of Daya Bay NPP

    International Nuclear Information System (INIS)

    Shen Zupei; Li Xiaodong; Huang Xiangrui

    2003-01-01

    The author applies the GO methodology to reliability analysis of the offsite power supply system of Daya Bay NPP. The direct quantitative calculation formulas of the stable reliability target of the system with shared signals and the dynamic calculation formulas of the state probability for the unit with two states are derived. The method to solve the fault event sets of the system is also presented and all the fault event sets of the outer power supply system and their failure probability are obtained. The resumption reliability of the offsite power supply system after the stability failure of the power net is also calculated. The result shows that the GO methodology is very simple and useful in the stable and dynamic reliability analysis of the repairable system

  2. Two managerial grids in NPP

    International Nuclear Information System (INIS)

    Zhao Hui

    2012-01-01

    Today, the nuclear power corporation (NPC) enjoys the profit of LCEP (the low carbon economic policy). at the same time, they also enduring more and more pressure. For example, the partner competition or the NPP potential occupational risk . The efficient counterplot of risk is the self-ability cultivation. It is essential to research the NPP managerial flow. The nuclear power plant (NPP) unit is a carrier of the NPC enterprise management system, and has taken on a new look 'pull one portion then the whole moving'. The NPP has three systematical characters, the security responsibility center, the man-machine system and the input-output system. The manufacturing system and the enterprise management system are the great constituents of the NPP managerial flows. Means of systems analysis, we can find out the truth of the NPP running interface. In CHINA, there are many operating experiences near 20 years. It indicates that the NPP manufacturing system and the enterprise system are the roots of the nuclear power corporation, the core of the all NPP systems must be based on it. So the ability cultivation is the work core to NPP. It is reliably to ensure the NPP to be up against problems, for instance, the security duty, the costing control and the man-machine system running harmoniously. This paper introduces the NPP managerial flow and the present state of QNPC, also come up with a proposal to refer for the NPC development actions of collective measure, specialization, standardization, fine. (author)

  3. External hazards in the PRA of Olkiluoto 1 and 2 NPP units - Accidental oil spills

    International Nuclear Information System (INIS)

    Tunturivuori, Lasse

    2014-01-01

    Oil transports in Finnish territorial waters have increased significantly during the last 10 years. The Gulf of Finland is at this moment a very important route of oil being transported from Russia to the Western Europe. Although the number of accidental oil spills is decreasing in amount and in size, there is a growing concern of their effects to nuclear power plants (NPPs). The amounts of oil transported on the Gulf of Bothnia are much smaller than on the Gulf of Finland. However, accidental oil spills have occurred also there, the size and amount of which are smaller, though. Accidental oil spills are often a result of grounding of a ship or collision of two ships, and often occur during harsh weather conditions like storm or dense fog. However, also coastal oil depots may break, the oil of which may spread over wide distances on the sea. The modelling of initiating events resulting from accidental oil spills includes oil spill response actions performed by the regional rescue services, alarming of the oil spill by the emergency response centre to the NPP rescue services and spill response by the NPPs rescue services. It is unclear what the consequences are if drifted oil would enter the coolant water tunnels. The effect of different oil types to the operation of the safety-related service water systems and components are being assessed. In the ultimate case, an oil spill would clog the inlet channels thus failing the ultimate heat sink of the NPP units. The licensee is evaluating what is the optimal way to operate the NPP units in the case that an oil slick is threatening the plant to ensure reactor core cooling and RHR. The continued operation of, and especially the cooling of, at least one auxiliary feedwater pump is critical in the mitigation of the initiating event. Strategies, like reversing the water flow of the cooling water channels or closing of the cooling water channels, are being evaluated. (authors)

  4. Estimation of the future nuclear power research in Romania, based on the present Cernavoda NPP evolution

    International Nuclear Information System (INIS)

    Dumitrache, Ion

    2001-01-01

    For more than four decades, the electric power needs of Romania were evaluated on the basis of the State Plan for Economic Development. To identify the optimal solution, the 'least price per produced MWh' was practically the only criterion. Now, there is no convincing estimation of the future economic development and at least two additional criteria play a significant role, 'the safety in the supply of the needed electric power', and 'the need of limiting the environmental impact of electricity generation'. The analysis dedicated to evaluation of future electric power solutions must take into account several features of the present situation. There are no available internal funds to finance the construction of new generating units of the order of several hundreds of MW. Even the so-called 'refurbishing' of the existing thermal power plants is based on foreign loan. In the 2000 year, about 80 electricity generation units reached 30 years of operation, i.e., the design life. Other thermal power plants proved very modest performances during 15-20 years of operation. Consequently, the future of almost 100 generating units is either in shutdown + decommissioning or shutdown + modernization situation. The Government analyzed the situation and decided to continue the completion of the Cernavoda NPP. The Unit 2 will be commissioned in a couple of years, and there is a schedule of negotiations relating the future of the Unit 3. After almost five years of successful operation of the Unit 1, the collaboration between RDT Institutes and NPP has clear features. Based on the experience related to this collaboration and taking into account the evolution of the Cernavoda NPP, we estimated that five research domains have significant chances to obtain a stable (and, hopefully, consistent) financial support. 1. Nuclear Safety, in particular Accident Analysis. As the Government re-iterated the firm decision to meet the conditions required for European integration, most of the nuclear

  5. Cernavoda NPP Unit 2 and Romanian nuclear industry

    International Nuclear Information System (INIS)

    Mocanu Horia

    2001-01-01

    On 18 May 2001, in the presence of Mr. Adrian Nastase, the Prime-Minister of Romania, the presidents of AECL, ANSALDO and Director General of SN Nuclearelectrica, the commercial and management contract for completing the Cernavoda NPP Unit 2 was signed. This document stipulates the goal and the partners' commitments, leadership organization, the SN Nuclearelectrica's control of the Budget, costs for the technical assistance (around 180 specialists from abroad), as well as the costs of equipment supplied from Canada and Italy. Services and equipment supplied by Canada and Italy amounts up to around USD 300 millions. Efforts are currently undertaken to obtain a loan of USD 300 millions from EURATOM, beginning from 2003. An auction process, implying around 10 companies, is underway and by the completion of the process, in February 2002, the practical delivery of equipment will start. The so-far invested capital amounts around USD 650 millions while the capital funds remaining to be invested amounts up to about USD 689 millions. From the latter figure, around USD 100 millions represent the costs for heavy water and the initial nuclear fuel charging. The personnel dynamics is presented as well as problems relating with recruitment and salary policy. Romanian nuclear industry is engaged for supply of a series of important components. General Turbo SA, supplied already components of some tens USD millions for the turbogenerator complex. PETROTUB company from Roman, Romania supplied already one thousand tones of non-nuclear carbon steel tubing valued at about USD 300 millions. ARIO, Bistrita, Romania, has signed contracts valued at about USD 400,000 for non-nuclear reinforcing materials. Other companies like AVERSA SA and Ventilatorul SA supplied reliable equipment for Unit 1 and will continue to do the same for Unit 2. Contracts of over one million USD are carried on with VULCAN for carbon steel fittings and with TITAN Nuclear Equipment for components of the fueling

  6. Operation experience of the advanced fuel assemblies at Unit 1 of Volgodonsk NPP within four fuel cycles

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kobelev, S.; Kushmanov, S.

    2006-01-01

    The first commissioning of Volgodonsk NPP Unit 1 with standard reactor WWER-1000 (project V-320) was in 2001. The reactor core, starting from the first fuel charge, was arranged completely with Advanced Fuel Assemblies (AFAs). In this way, it is possible to obtain the experience in startup and operation of the core, completely arranged with AFAs, and also to get a possibility of performing the comprehensive check for justification of newly commissioned units and justification of design solutions accepted in the design of reactor core for Taiwan NPP, Bushehr NPP and Kudankulam NPP. The first fuel charge of the Volgodonsk NPP Unit 1 is a reference and unified for Tiawan NPP (V-428), Bushehr NPP (V-446), Kudankulam NPP(V-412) with small differences caused by design features of RP V-320. The first core charge of Unit 1 of Volgodonsk NPP was arranged of 163 AFAs, comprising 61 CPS ARs and 42 BAR bundles. The subsequent fuel charges were arranged of AFAs with gadolinium oxide integrated into fuel instead of BAR. By 2005 the results of operation of the core at Unit 1 of Volgodonsk NPP during four fuel cycles showed that AFA is sufficiently reliable and serviceable. The activity of the primary coolant of the Volgodonsk NPP is at stable low level. During the whole time of the core operation of the Volgodonsk NPP Unit 1 no leaky AFAs were revealed. The modifications of the internals, made during pre-operational work, are reasonable and effective to provide for fuel mechanical stability in the course of operation. The modifications, made in AFA structure during operation of the Volgodonsk NPP Unit 1, are aimed at improving the service and operational reliability of its components. Correctness of the solutions taken is confirmed by AFAs operation experience both at the Volgodonsk NPP, and at other operating Russian NPPs

  7. Rupture of DN 500 - design basic accident at units 3 and 4 of Kozloduy NPP

    International Nuclear Information System (INIS)

    Uruchev, V.; Vassilev, P.; Ivanova, A.; Sartmadjiev, A.

    2005-01-01

    The original design of Kozloduy NPP Units 3 and 4 assumes as Design Basis Accident (DBA) the rupture of DN 32 mm primary pipeline, while an initial event of double-sided guillotine break of primary pipeline with maximal diameter is not considered. In the course of units modernization it have been demonstrated once and again that both the emergency core cooling systems and the localization systems can cope with larger and larger primary circuit leaks. After the installation of a Jet-Vortex Condenser (JVC) at Units 3 and 4 it was substantiated that, the integrity of the hermetic rooms is ensured even in case of double-sided guillotine break of a primary circuit pipeline with maximal diameter (DEGB). The technical justification of the jet-vortex condenser, elaborated by VNIAEC, contains calculations determining both the source term and the doses obtained outside the NPP site after LOCA DN 500. LOCA DN 500 is considered in these analyses as a beyond design basis accident and it is so included in the SAR and approved by the Nuclear Regulatory Agency (NRA). The thermo-hydraulic calculations performed later on show that the emergency core cooling systems can cope with this initial event at conservative assumptions. In order to classify this initiating event as a design basis accident it is necessary to demonstrate that the core cooling criteria are fulfilled and the internal and external doses outside the NPP site are within the permissible limits fixed for design basis accident by the Bulgarian regulatory body (NRA), when using conservative assumptions. For this purpose two consecutive studies were performed - evaluation of the DEGB probability and categorization of the initial event according to the contemporary regulations acting in Republic of Bulgaria. The presented report summarizes the results of the performed conservative analyses of double-sided guillotine break accident of main circulation line taking into account the probability of rupture of large diameter

  8. Role of the team of scientific and technical commissioning support (TSTCS) during Mochovce NPP unit 3 and 4 commissioning

    International Nuclear Information System (INIS)

    Hermansky, J.; Prachar, M.; Sedlacek, M.; Petenyi, V.

    2011-01-01

    The Team of Scientific and Technical Commissioning Support (TSTCS) shall provide an independent support for the Mochovce NPP 3 and 4 Commissioning Department during Mochovce Units 3 and 4 commissioning. This independent support will be in line with the Mochovce NPP 3 and 4 Directive 'Non-active tests and commissioning' and it will be carried out in form of professional and expert works focusing on supervision of fulfilment of requirements for nuclear safety observance. The TSTCS duty to provide for such services during NPP commissioning is specified by Slovak Regulatory Body legislation. The independent TSTCS will supervise; - fulfilment of requirements for nuclear safety during preparation and implementation of commissioning tests; -scientific and technical level of commissioning programmes, and reflection on nuclear safety requirements in commissioning programmes,- commissioning process and test results. Main standpoints of the Team activities for individual unit commissioning stages will be; - assesment of the selected programs of functional tests in installations having an impact on nuclear safety and evaluation of the results of these tests; - assesment of the programs of physics and power commissioning, - assesment of the unit preparedness before fuel loading start; - assesment of the unit preparedness for performing initial criticality and low power commissioning and power commissioning stages; - evaluation of the results of physics and power commissioning stages and sub-stages; - final evaluation of the results from implementing the physics and power commissioning stages. The paper also presents a short description of the Team scope activities, the Team organisation, and a procedure for issuing of standpoints to individual unit commissioning stages. (Authors)

  9. Perspectives for utilization of the experience from the electrical equipment modernization of Kozloduy NPP units 5 and 6 in case of construction of new NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2005-01-01

    In 2005 a governmental decision for continue the project for construction of Belene NPP was adopted. In case of start of this significant project in short terms, a good option will be to utilize the already achieved experience by the modernization program of units 5 and 6 of Kozloduy NPP. The process of construction of new NPP is associated with significant amount of engineering, civil construction works, equipment order and delivery, installation works, testing and commissioning activities. It is vital necessity to have optimal technology, strict organization for project implementation and excellent documentation. From technical point of view the experience from the modernization of units 5 and 6 of Kozloduy NPP will be very important in case of utilization of similar types of WWER 1000 units. According to the 'Feasibility study for construction of Belene NPP', the most favorable option is to accomplish the already partially constructed Unit 1 on the basis of upgraded WWER B-320 design - WWER 1000 B-392, in order to fulfill IEC 331-3A, IEC 332-3A, and of US NRC Regulatory Guide 1.70 and to construct the second unit on the basis of ASE WWER/1000 B-466. However, for any type of unit selected, the achieved experience will be an important basis. This article is focused mostly on the modernization aspects of some electrical systems of Kozloduy NPP

  10. Reliability research based experience with systems and events at the Kozloduy NPP units 1-4

    Energy Technology Data Exchange (ETDEWEB)

    Khristova, R; Kaltchev, B; Dimitrov, B [Energoproekt, Sofia (Bulgaria); Nedyalkova, D; Sonev, A [Kombinat Atomna Energetika, Kozloduj (Bulgaria)

    1996-12-31

    An overview of equipment reliability based on operational data of selected safety systems at the Kozloduy NPP is presented. Conclusions are drawn on reliability of the service water system, feed water system, emergency power supply - category 2, emergency high pressure ejection system and spray system. For the units 1-4 all recorded accident protocols in the period 1974-1993 have been processed and the main initiators identified. A list with 39 most frequent initiators of accidents/incidents is compiled. The human-caused errors account for 27% of all events. The reliability characteristics and frequencies have been calculated for all initiating events. It is concluded that there have not been any accidents with consequences for fuel integrity or radioactive release. 14 refs.

  11. Reliability research based experience with systems and events at the Kozloduy NPP units 1-4

    International Nuclear Information System (INIS)

    Khristova, R.; Kaltchev, B.; Dimitrov, B.; Nedyalkova, D.; Sonev, A.

    1995-01-01

    An overview of equipment reliability based on operational data of selected safety systems at the Kozloduy NPP is presented. Conclusions are drawn on reliability of the service water system, feed water system, emergency power supply - category 2, emergency high pressure ejection system and spray system. For the units 1-4 all recorded accident protocols in the period 1974-1993 have been processed and the main initiators identified. A list with 39 most frequent initiators of accidents/incidents is compiled. The human-caused errors account for 27% of all events. The reliability characteristics and frequencies have been calculated for all initiating events. It is concluded that there have not been any accidents with consequences for fuel integrity or radioactive release. 14 refs

  12. Top level risk study for units 1 to 4 at NPP Kozloduy

    International Nuclear Information System (INIS)

    Shishkova, I.

    1997-01-01

    The first Top Level Study of NPP Kozloduy Units 1/4 was started in 1991 and completed in March 1992 by BEQE. The Primary objective of the project was to provide in a short term a tool for quantified comparison of the relative risk benefits that various design or operational modifications would have if implemented on NPP Kozloduy Units 1/4. This original version of the Study was reviewed by the IAEA who agreed in general with the conclusions indicating that the report provides valuable insights which should be used in the decision making process. The IAEA made suggestion for some changes. These comments were taken into account in the subsequent version. In early 1994 the new version was issued. The objective of this second project, in addition to revising the original study to reflect the IAEA comments, was to address the potential benefits from further improvements at NPP Kozloduy. The work on the second version was going on in parallel with the activities carried out in the mainframe of several NPP Kozloduy Units 1/4 Upgrading Program (WANO Six-Month Program, Program for the NPP Kozloduy Units 1-4 Upgrading, Twinning Program, etc.). And at last, a Top-Level Probabilistic Safety Study was carried out by EQE - Bulgaria and completed early in 1995 at the request of NPP Kozloduy. The objective of the project was the contribution of the different activities performed in the mainframe of the Program for the NPP Kozloduy Units 1-4 Safety Upgrading in the overall safety improvement to be assessed. 3 figs, 1 tab

  13. Dukovany NPP - Safely 16 TERA

    International Nuclear Information System (INIS)

    Vlcek, J.

    2008-01-01

    In this presentation increasing of power output of the Dukovany NPP is reviewed. To operate all Dukovany Units safely with the perspective of long-term operation (LTO) of 50 - 60 years it is proposed.

  14. Analysis of the first stage in the reactor accident development at the Chernobyl NPP fourth unit

    International Nuclear Information System (INIS)

    Adamov, E.O.; Vasilevskij, V.P.; Ionov, A.I.

    1988-01-01

    Results of analyzing possible development of the first stage of the accident at the Chernobyl NPP fourth unit from the moment of pressing the Az-5 push button are presented. Calculations were conducted using the TRIADA three-dimensional dynamic program both for conditions without pump switching off and with their switching off. Distribution of neutron field over the core volume was determined according to actual readings of in-core detectors immediately before turbogenerator switching off. It is shown that sufficient reconstruction of neutron field begins immediately after pressing the Az-5 push button. Prohibitive decrease of operative reactivity margin which was admitted by personnel in the accident resulted in the growth of neutron power in reactor lower part within 1.5 s, predominating over power decrease in the upper part. Thus, the average integral power grows achieving the maximum during 7.5 s, after which its sharp decrease begins. Conditions with switching off of 4 circulating pumps lead to intesive growth of power and reactor runaway, initiated in the lower part of the core, which safety rods have not managed to reach. Fuel element temperature at that exceeds fuel melting point in the most power-intensive regions. This causes extremely intensive process of steam generation and overheating, pressure growth in the circuit, short-time decrease of the rate of operating pumps, destruction of fuel channels and the whole reactor. Primary measures assuring RBMK ractor safety were formulated on the basis of conducted investigation

  15. Analysis of the behaviour of the Kozloduy NPP Unit 3 under severe accident conditions

    International Nuclear Information System (INIS)

    Velev, V.; Saraeva, V.

    2004-01-01

    The objective of the analysis is to study the behaviour of the Kozloduy NPP Unit 3 under severe accident conditions. The analysis is performed using computer code MELCOR 1.8.4. This report includes a brief description of Unit 3 active core as well as description and comparison of the key events

  16. Kozloduy NPP units 1-4 significance for Bulgaria

    International Nuclear Information System (INIS)

    Georgiev, J.

    2003-01-01

    General data about nuclear power in Bulgaria is presented. The main topics covered are: estimated energy reserve; energy balance, new capacities, installed in 2002; information about the WWER-230 reactors operation; environmental impact and global warming; Bulgarian export and regional electricity demand; public opinion etc. The problem 'Long term safe operation vs forced early closure' is discussed. It is concluded that the decision on early closure of any unit should be made on economic grounds or failure to meet regulatory safety standards and must not be politically motivated

  17. Calculation of economic and financing of NPP and conventional power plant using spreadsheet innovation

    International Nuclear Information System (INIS)

    Moch Djoko Birmano; Imam Bastori

    2008-01-01

    The study for calculating the economic and financing of Nuclear Power Plant (NPP) and conventional power plant using spreadsheet Innovation has been done. As case study, the NPP of PWR type of class 1050 MWe is represented by OPR-1000 (Optimized Power Reactor, 1000 MWe) and the conventional plant of class 600 MWe, is coal power plant (Coal PP). The purpose of the study is to assess the economic and financial feasibility level of OPR-1000 and Coal PP. The study result concludes that economically, OPR-1000 is more feasible compared to Coal PP because its generation cost is cheaper. Whereas financially, OPR-1000 is more beneficial compared to Coal PP because the higher benefit at the end of economic lifetime (NPV) and the higher ratio of benefit and cost (B/C Ratio). For NPP and Coal PP, the higher Discount Rate (%) is not beneficial. NPP is more sensitive to the change of discount rate compared to coal PP, whereas Coal PP is more sensitive to the change of power purchasing price than NPP. (author)

  18. 76 FR 46330 - NUREG-1934, Nuclear Power Plant Fire Modeling Application Guide (NPP FIRE MAG); Second Draft...

    Science.gov (United States)

    2011-08-02

    ... NUCLEAR REGULATORY COMMISSION [NRC-2009-0568] NUREG-1934, Nuclear Power Plant Fire Modeling... 1023259), ``Nuclear Power Plant Fire Modeling Application Guide (NPP FIRE MAG), Second Draft Report for...), ``Nuclear Power Plant Fire Modeling Application Guide (NPP FIRE MAG), Second Draft for Comment,'' is...

  19. Load flow analysis for determining the location of NPP power distribution in West Kalimantan

    International Nuclear Information System (INIS)

    Citra Candranurani; Rizki Finnansyah Setya Budi; Sahala M Lumbanraja

    2015-01-01

    Electricity crisis condition happened in West Kalimantan (Kalbar) as a result of power plant capacity almost equal to the peak load. The system will experience a shortfall if there are plants that not operating and do not have reserve. The policy of electricity planning until 2022 is replacing diesel power plant with steam power plant. For long-term planning is required the role of new and renewable energy in order to reduce dependency on fossil fuel consumption, such as NPP utilization. The purpose of this study was to determine the optimum location of the NPP power distribution in order to prepare electricity infrastructure. Load flow calculation in this study using ETAP 12.5 software. NPP is planned to supply base load, so the optimum capacity factor is above 80 %. The result show that there are three location where NPP can generate over 80 % of its capacity, namely: Mempawah Substation, Singkawang Substation, and Sambas Substation. The most optimum located in Mempawah Substation with capacity factor 83.5 %. The location of the three Substation are onshore and in line with one requirement for NPP construction, namely: the availability of cooling water. (author)

  20. ICEMENERG technologies of water treatment applied at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Stanca, Angela; Bolma, Aurelia; Serbanescu, Agnes; Raducanu, Alice

    2002-01-01

    The paper presents the ICEMENERG technologies for water treatment applied at Cernavoda Unit 1, the treatment of the additional water for power steam generators and the chemical treatment of cooling system water. The requirements for quality of water totally demineralized as imposed by the AECL-ANSALDO consortium are as following: electrical conductivity, < 0.2 mS/cm; total silicon, <0.02 mg/L; ionic silicon, <0.01 mg/L; sodium, < 0.05 mg/L; TOC, <0.300 mg/L. These requirements raise rather difficult problems to be solved because the raw water source in case of Cernavoda NPP is Danube River which presents a raising trend of organic and inorganic contamination. Accordingly, experiments at laboratory scale reproducing the entire technological flow were conducted. The following operations were studied: pretreatment with limewash, ferric chloride (with and without coagulation additives); demineralization with ion exchangers of Purolite and Amberlite types. The system consisted of a cationic stage, formed of an strongly acid step with countercurrent recovery and an anionic stage formed of two steps, namely, a weakly basic step and a strongly basic step with recovery inserted; finishing on mixed bed. The paper presents also the chemical treatment/conditioning of the cooling loop of turbine condenser. The Cernavoda NPP cooling system is an open system with a single flow of cooling water comprising two systems, namely, the circulation water system ensuring the steam condenser cooling and the servicing water system ensuring the cooling of heat exchangers in the recirculated water circuit (RCWS), the turbine oil coolants, the coolants of auxiliary steam as well as the emergency core cooling system. Studies were conducted to ensure the chemical conditioning of the raw water from Danube River, particularly, to destroy and remove the shells, the algae and other components. Finally, the following four steps of conditioning the water of the cooling system are summarized: 1

  1. Advances in safety countermeasures at the Tomari NPP of Hokkaido Electric Power on the basis of Fukushima Daiichi NPP accident. Fire protection and other advances

    International Nuclear Information System (INIS)

    Shibata, Taku; Dasai, Katsumi

    2014-01-01

    Fire protections for the nuclear power plants have been based on the fire laws and the conventional guide. After Fukushima Daiichi NPP accident, many safety countermeasures - also about Fire Protection - have been discussed in the Japanese authorities. This paper shows our present activities in the Tomari NPP about the fire protections from the view points of Fire Prevention, Fire Detection/Suppression Systems and Fire Protection, and other advances. (author)

  2. Experimental determinations of the turbine condenser operation at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Romascu, Gabriel; Dragusin, Dumitru; Rogociu, Ioan; Macodean, Luminita; Marciulescu, George

    1999-01-01

    The condenser system represents one of the most important BOP (balance of plant) systems of the CANDU 700 MW Unit at Cernavoda NPP. The paper presents theoretical calculation elements, mathematical model for simulation of condenser operation and the results obtained by model implementation as compared to operation data. The model could be adapted to other turbine and operation regime types. (authors)

  3. Improved Nuclear Power Plant maintenance. Application to Cofrentes NPP

    International Nuclear Information System (INIS)

    Serradell, V.

    2002-01-01

    The Industrial Safety and Environment Group (MEDASEGI) of the Valencia Polytechnic University (UPV) develops its activities in the fields of environmental radioactivity metrology and risk analysis and management aimed at improving industrial safety. The different lines of research developed by this group include collaboration with Cofrentes NPP. This collaboration began in 1993 and has primarily focused on issues related to improved maintenance and currently on life management. (Author)

  4. Arrangement of the Krsko NPP protection scheme for the power system malfunction cases

    International Nuclear Information System (INIS)

    Omahen, P.; Pavsek, J.; Dirnbek, V.

    1996-01-01

    The Krsko NPP has been designed with the capability to reject 100% of its rated power and runback to the station electrical load. However, an adequate detection system of the outside network degradation is needed for the activation of the existing load drop anticipated (LDA) function. The Krsko NPP electrical, turbine and generator protection systems were carefully evaluated in order to redesign some of its functions. These additional functions should be able to protect and disconnect the plant from the system whenever some serious trouble of the outside electric power system is detected. On the other side, preventive measures should be introduced to avoid unnecessary plant disconnection or unnecessary power system collapse due to such disconnection. At the end, the paper presents a precise design of additional function possibilities for the Krsko NPP electrical protection system. A critical evaluation of these functions is given and the best option is proposed. (author)

  5. Periodical safety review of units 1 and 2 of PAKS NPP. Examples from summary report

    International Nuclear Information System (INIS)

    Hammar, K.

    1998-01-01

    On the basis of American practice of qualification and relevant IAEA recommendations detailed guidelines of the qualification procedure were developed and executed on the Units 1 and 2 of the Paks NPP. Periodic safety supervision will be performed by evaluation of the following reports to be submitted by NPP: real technical conditions of the facility; existing practice and proposals for equipment qualification; evaluation of the existing safety reports estimating their validity up to the plant lifetime; ageing and ageing management; procedures of operation, maintenance, supervision; organisation and administration; safety impact of human factor, training, education, qualification of personnel

  6. Seismic soil-structure-equipment interaction analysis of unit 5/6, Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Kostov, M [Bulgarian Academy of Sciences, Central Laboratory for Seismic Mechanics and Earthquake Engineering, Sofia (Bulgaria)

    1995-07-01

    This research project is aimed to analyse problems of soil-structure-equipment interaction under seismic excitation in case of Kozloduy NPP. Reevaluation and upgrading of Kozloduy NPP has started after 1977 Vrancea earthquake. New Safe Shutdown Earthquake (SSE) level was defined, upgrading most of structural equipment was performed, seismic instrumentation was installed. New investigations were initiated after 1990 IAEA mission visited the site. A comprehensive site confirmation project was started with a subsequent structural and equipment reevaluation and upgrading. This work deals with Units 5 and 6 of WWER-1000 type only.

  7. Kozloduy NPP units 3 and 4 rest life time program execution

    International Nuclear Information System (INIS)

    Genov, S.

    2005-01-01

    In this paper the following tasks are considered: Kozloduy NPP units 3 and 4 life time evaluation; programme for the units life time assuring; units 3 and 4 renewals. The main activities for the programme implementation are described and the obtained results are presented. In conclusion, the executed activities of program for assuring the life time of units 3 and 4 of Kozloduy NPP, cogently prove that the lifetime of structures, systems and components, is assured duly and those structures, systems and components will be in service safely, economically effectively and mostly reliable till the end of the 30 years design lifetime. For some of them it has been proved even for 35 and 40 years. Program activities continue during 2005, although the early shutdown of units 3 and 4 is possible

  8. Units 3 and 4 of Kozloduy NPP - modernized in compliance with the contemporary international standards

    International Nuclear Information System (INIS)

    Urutchev, V.

    2005-01-01

    In this paper the Kozloduy NPP units 1- 4 original design characteristics are given. The main results from units 3 and 4 modernization programme as well as: assurance of reactor core safety; assurance of SLA reliability; assurance of unit safety and reliability are presented. The Kozloduy NPP units 3 and 4 modernization programme and the position of the units in the generally accepted scale of risk assessment are illustrated. The fulfillment of the IAEA and EC requirements and AQG recommendations is also presented. At the end the author concluded that: 1) The results from units 3 and 4 large scale modernization programs realization are assessed by international community as one of the most effective examples of good international practices applying in the filed of the nuclear facilities safety; 2) There are not any technical reasons behind discussions for early closure of units 3 and 4; 3) Taking into account the Balkans electricity consumption prognosis and the condition of the electricity production facilities, Kozloduy NPP units 3 and 4 can have sufficient contribution for the region reliable electricity delivery in the future years

  9. A Preliminary Study on the Containment Integrity following BIT Removal for Kori NPP Unit 3,4

    Energy Technology Data Exchange (ETDEWEB)

    Song, Dong Soo; Byun, Choong Sup [KEPRI, Nuclear Power Generation Laboratory, Daejeon (Korea, Republic of); Jo, Jong Young [ENERGEO Inc., Sungnam (Korea, Republic of)

    2008-05-15

    The Boron Injection Tank (BIT) is to provide high concentrated boric acid to the reactor in order to mitigate the consequences of postulated Main Steam Line Break accidents (MSLB). Although BIT plays an important role in mitigating the accident, high concentration of 20,000ppm causes valve leakage, pipe clog, precipitation and continuous heat tracing have to be provided. This paper is for the feasibility study of containment integrity using CONTEMPT code for BIT removal of Kori Nuclear Power Plant (NPP) Unit 3, 4.

  10. A Preliminary Study on the Containment Integrity following BIT Removal for Kori NPP Unit 3,4

    International Nuclear Information System (INIS)

    Song, Dong Soo; Byun, Choong Sup; Jo, Jong Young

    2008-01-01

    The Boron Injection Tank (BIT) is to provide high concentrated boric acid to the reactor in order to mitigate the consequences of postulated Main Steam Line Break accidents (MSLB). Although BIT plays an important role in mitigating the accident, high concentration of 20,000ppm causes valve leakage, pipe clog, precipitation and continuous heat tracing have to be provided. This paper is for the feasibility study of containment integrity using CONTEMPT code for BIT removal of Kori Nuclear Power Plant (NPP) Unit 3, 4

  11. Construction of Site Risk Model using Individual Unit Risk Model in a NPP Site

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Ho Gon; Han, Sang Hoon [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Since Fukushima accident, strong needs to estimate site risk has been increased to identify the possibility of re-occurrence of such a tremendous disaster and prevent such a disaster. Especially, in a site which has large fleet of nuclear power plants, reliable site risk assessment is very emergent to confirm the safety. In Korea, there are several nuclear power plant site which have more than 6 NPPs. In general, risk model of a NPP in terms of PSA is very complicated and furthermore, it is expected that the site risk model is more complex than that. In this paper, the method for constructing site risk model is proposed by using individual unit risk model. Procedure for the development of site damage (risk) model was proposed in the present paper. Since the site damage model is complicated in the sense of the scale of the system and dependency of the components of the system, conventional method may not be applicable in many side of the problem.

  12. Completion of Units 3 and 4 at Mochovce NPP

    International Nuclear Information System (INIS)

    Aquilanti, G.

    2009-01-01

    After the completion of a feasibility study, SE/ENEL decided to complete Mochovce Nuclear Power Plant Units 3 and 4 in April 2007. In July 2008, after a revision of the Basic Design that led to the inclusion of additional safety improvements, the European Commission issued a positive viewpoint on the decision. In August 2008 the Slovak Nuclear Regulatory Authority issued a permit for 'modification of a construction project prior to its completion', approving the Basic Design modifications: the kick-off of site activities was on November 2008. In December 2008, SE initiated the Environmental Impact Assessment (EIA) procedure aimed at obtaining the Operational License by submitting the EIA intent to the Ministry of Environment. A multi contractual strategy was adopted for the completion works: the total number of foreseen contracts is about 250 (90 main and additional 160 minor). In the following the present status of the project is presented: in particular, the Project Management system implemented by SE/ENEL is described and the progress of the engineering, fabrication and construction activities is analyzed. (author)

  13. Adjustment of the Kompleks Titan-2 monitoring computerized system at the Rovno NPP third unit

    International Nuclear Information System (INIS)

    Zigaev, B.P.

    1987-01-01

    Information signal origin and processing processes in the monitoring computerized system 'Komplex Titan-2' at the Rovno NPP third unit are considered. The system exercises control over the following production equipment parameters: the state of keys of control of lock fittings, mechanisms, regulators, reserve mechanism automatic shut-down circuit; the state of lock fittings, mechanisms, regulators, reserve mechanism automated switching on; parameter deviation from permissible values; interlock operation; protection system state; the state of autonomous units and devices

  14. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 3A. Kozloduy NPP units 5/6: Analysis/testing. Working material

    International Nuclear Information System (INIS)

    1995-01-01

    The Co-ordinated research programme on the benchmark study for the seismic analysis and testing of WWER-type nuclear power plants was initiated subsequent to the request from representatives of Member States. The conclusions adopted at the Technical Committee Meeting on Seismic Issues related to existing nuclear power plants held in Tokyo in 1991 called for the harmonization of methods and criteria used in Member States in issues related to seismic safety. The Consulltants' Meeting which followed resulted in producing a working document for CRP. It was decided that a benchmark study is the most effective way to achieve the principal objective. Two types of WWER reactors (WWER-440/213 and WWER-1000) were selected as prototypes for the benchmark exercise to be tested on a full scale using explosions and/or vibration generators. This volume of Working material contains reports related analyses and testing of Kozloduy nuclear power plant, units 5 and 6

  15. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 3B. Kozloduy NPP units 5/6: Analysis/testing. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The Co-ordinated research programme on the benchmark study for the seismic analysis and testing of WWER-type nuclear power plants was initiated subsequent to the request from representatives of Member States. The conclusions adopted at the Technical Committee Meeting on Seismic Issues related to existing nuclear power plants held in Tokyo in 1991 called for the harmonization of methods and criteria used in Member States in issues related to seismic safety. The Consulltants' Meeting which followed resulted in producing a working document for CRP. It was decided that a benchmark study is the most effective way to achieve the principal objective. Two types of WWER reactors (WWER-440/213 and WWER-1000) were selected as prototypes for the benchmark exercise to be tested on a full scale using explosions and/or vibration generators. This volume of Working material contains reports related analyses and testing of Kozloduy nuclear power plant, units 5 and 6.

  16. Flywheel and power unit

    Energy Technology Data Exchange (ETDEWEB)

    Seeley, R.W.

    1992-10-28

    A power unit, e.g. for an electrically driven vehicle, incorporates a flywheel for storing kinetic energy and a battery for storing electrical energy. The battery is incorporated as a substantial part of the rotating mass of the flywheel. Preferably the unit further includes an electrical machine being a motor or generator or machine operable either as a motor or a generator for transferring energy between the battery and the flywheel and/or for the input or output of rotary energy therefrom or thereto. The motor may be used for powering the flywheel and may also operate in a regenerative mode for recharging the unit on de-acceleration of the vehicle. The unit of the invention may also be utilized as an electrical stored power source, e.g. wind or water driven. (author)

  17. Chernobyl'-88. Reports of the 1. All-Union scientific and technical meeting on results of accident effect elimination at the Chernobyl' NPP. V. 7. Part 1. Localization of accident consequences at the 4th power unit, operating site of the Chernobyl NPP and adjoining territories

    International Nuclear Information System (INIS)

    Ignatenko, E.I.

    1989-01-01

    The next data on the accident consequence elimination are presented: temperature monitoring results, gamma radiation exposure dose rates, neutron and gamma fields, aerosol disperse composition. The information system for scientific researches FINISH and automatic subsystems for radiation control and the Ukrytie object diagnostics are described. Decontamination of the Chernobyl' NPP territory, equipment and rooms is described too

  18. Chernobyl'-88. Reports of the 1. All-Union scientific and technical meeting on results of accident effect elimination at the Chernobyl' NPP. V. 7. Part 2. Localization of accident consequences at the 4th power unit, operating site of the Chernobyl' NPP and adjoining territories

    International Nuclear Information System (INIS)

    Ignatenko, E.I.

    1989-01-01

    The next data on the accident consequence elimination are presented: temperature monitoring results, gamma radiation exposure dose rates, neutron and gamma fields, aerosol disperse composition. The information system for scientific researches FINISH and automatic subsystems for radiation control and the Ukrytie object diagnostics are described. Decontamination of the Chernobyl' NPP territory, equipment and rooms is described too

  19. Temelin NPP commissioning experiences

    International Nuclear Information System (INIS)

    Hanus, V.

    2002-01-01

    The Building Permit for the Temelin NPP with four VVER units was issued in 1986, which is a long time ago. Since then, however, was taken a route that is very different from what anybody imagined. Described are the legislative and design changes and given is a current condition of the power plant

  20. A Study on Human Factors in Maintenance of a Nuclear Power Plant (NPP)

    International Nuclear Information System (INIS)

    Park, Young Ho; Seong, Poong Hyun

    2006-01-01

    In human factors research, more attention has been devoted to the operation of a nuclear power plant (NPP) than to their maintenance. However, more NPP incidents are caused by inadequate maintenance rather than by faulty operation. There is a trend in NPP toward introducing digital technology into safety and non-safety systems. This lead to changes of maintenance, and support systems such as diagnosis system, augmentation system and handy terminal will be developed. In this context, it is important to identify tasks of human related to each phase of maintenance and their relation in order to apply those to maintenance. However, there are few researches of human factors in maintenance. This paper studies on framework of cognitive task analysis for developing maintenance support systems

  1. Nuclear power plant maintenance personnel reliability prediction (NPP/MPRP) effort at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.

    1981-01-01

    Human errors committed during maintenance activities are potentially a major contribution to the overall risk associated with the operation of a nuclear power plant (NPP). An NRC-sponsored program at Oak Ridge National Laboratory is attempting to develop a quantitative predictive technique to evaluate the contribution of maintenance errors to the overall NPP risk. The current work includes a survey of the requirements of potential users to ascertain the need for and content of the proposed quantitative model, plus an initial job/task analysis to determine the scope and applicability of various maintenance tasks. In addition, existing human reliability prediction models are being reviewed and assessed with respect to their applicability to NPP maintenance tasks. This paper discusses the status of the program and summarizes the results to date

  2. An Extreme Meteorological Events Analysis For Nuclear Power Plant (NPP) Siting Project at Bangka Island, Indonesia

    Science.gov (United States)

    Septiadi, Deni; S, Yarianto Sugeng B.; Sriyana; Anzhar, Kurnia; Suntoko, Hadi

    2018-03-01

    The potential sources of meteorological phenomena in Nuclear Power Plant (NPP) area of interest are identified and the extreme values of the possible resulting hazards associated which such phenomena are evaluated to derive the appropriate design bases for the NPP. The appropriate design bases shall be determined according to the Nuclear Energy Regulatory Agency (Bapeten) applicable regulations, which presently do not indicate quantitative criteria for purposes of determining the design bases for meteorological hazards. These meteorological investigations are also carried out to evaluate the regional and site specific meteorological parameters which affect the transport and dispersion of radioactive effluents on the environment of the region around the NPP site. The meteorological hazards are to be monitored and assessed periodically over the lifetime of the plant to ensure that consistency with the design assumptions is maintained throughout the full lifetime of the facility.

  3. Numerical Analysis of Loss of Residual Heal Removal System (RHRS) during Mid-Loop Operation for Hanul NPP Units 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sook Kwan; Park, Seong Gyu; Han, Sang Koo [ACT Co., Daejeon (Korea, Republic of)

    2016-10-15

    As a part of supporting LPSD (Low Power and Shutdown) PSA (Probabilistic Safety Assessment) of Hanul NPP units 1 and 2, numerical analysis for a loss of RHRS (Residual Heat Removal system) during midloop operation was performed using RELAP5/MOD3.3 code. The one of main purpose of thermal hydraulic analysis for PSA work is to estimate times allowable for operation actions in each accident. A loss of RHRS during mid-loop operation may cause more significant results than during RCS full condition due to reduced RCS inventory. In order to perform this kind of analysis, it is particularly important to establish a steady state of mid-loop operational initial condition. Mid-loop operation corresponds to POS(Plant Operational State) 5 and 11 in the category of LPSD PSA at Hanul NPP units 1 and 2. RELAP5/MOD3.3 code was used to predict behaviors of RCS and fuels for the case of loss of RHRS during mid-loop operation at Hanul NPP units 1 and 2. The initial state of mid-loop operational condition was established by proper control of charging and letdown flow. Considering existing similar analysis results for this kind of accident, it can be concluded that RELAP5 code well predicts reasonably the behavior of RCS for loss of RHRS during mid-loop operation in Hanul NPP units 1 and 2. Thus the method developed in the analysis can be applied reasonably to support LPSD PSA.

  4. Results from modernization of the containment localization systems of the Kozloduy NPP units 3 and 4

    International Nuclear Information System (INIS)

    Sabinov, S.

    2005-01-01

    The improvements of the Accident Localization System (SLA) of units 3 and 4 systematically implemented by Kozloduy NPP shows an important direction for increasing the safety of NPP with WWER-440/V-230 containments. During the years Kozloduy NPP implemented a large scope of activities aimed in full resolution of all generic shortcomings identified in the original design of these containments. These activities allowed already in 2002 to justify that integrity of the containment is assured for all postulated events and the radiological consequences for all DBAs and BDBAs without core degradation are within the regulatory limits. The last phase of this modernization was oriented toward achieving the same goals in case of severe accidents by installation of systems for avoiding long term pressurization of the SG compartments and by installation of a system for keeping of negative pressure (slight vacuum) during the late phases of development of the accidents thus minimizing significantly the uncontrolled radioactive releases from the containment and assured controlled purified release of radioactivity to environment, and for elimination of conditions for H2 deflagration within the localization system. This paper summarizes the results of the whole modernization process with an emphasis of the implementation of the latest phase successfully completed by Kozloduy NPP in first quarter of 2005 which allowed the plant to demonstrate remarkable mitigation capability for a comprehensive set of very low probability severe accidents scenarios in line with the approach now being promoted for the modern design NPPs

  5. Development of Information Datasheets of Nuclear Power Plant (NPP) Equipment using cfiXLM schema

    International Nuclear Information System (INIS)

    Lee, Jaiho; Song, Eunhye

    2014-01-01

    In 2009, EPRI (Electrical Power Research Institute) published a new NPP information handover guide to provide NPP owners and operators with data handover templates in consistent format for effective delivery of information during all stages of the handover process. Another difficult concern for NPP data information management is to exchange the data information among many organizations such as NPP owners, operators, engineering companies, suppliers, and vendors. As a matter of fact, the improperly formatted handover of information sometimes occurs due to the discrepancy of data format (e. g., data description language type). This improper delivery can make negative effects on NPP integrity and safety. Thus, the lack of proper exchange for different data information systems of organizations should be resolved by using an international standard data format. The standard data format can reduce the cost and time for data exchange in each phase for design, procurement, delivery, installation, operation and maintenance of equipment. The AEX(automating equipment information exchange) pilot implementation project team under EPRI advanced nuclear technology (ANT) program has been conducted a research for the use of XML equipment schemas for electronic data exchange(EDE). They applied XML equipment schema for the design, selection, quotation, purchase and mock install of a safety injection centrifugal pump using EDE standard HI(hydraulic institute) 50.7. For data exchange, FIATECH, an industry consortium, has equally developed library of templates and reference data for ISO-15926, which is an international standard capable of reducing data-error and delivery time for exchanging data among different organizations. KHNP as an only owner/operator company has not experienced much difficulty in data interoperability with other organizations, but continued its unremitting exertions to develop a robust system capable of managing data information generated in all the stages of NPP

  6. Development of Information Datasheets of Nuclear Power Plant (NPP) Equipment using cfiXLM schema

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jaiho; Song, Eunhye [KHNP-Central Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    In 2009, EPRI (Electrical Power Research Institute) published a new NPP information handover guide to provide NPP owners and operators with data handover templates in consistent format for effective delivery of information during all stages of the handover process. Another difficult concern for NPP data information management is to exchange the data information among many organizations such as NPP owners, operators, engineering companies, suppliers, and vendors. As a matter of fact, the improperly formatted handover of information sometimes occurs due to the discrepancy of data format (e. g., data description language type). This improper delivery can make negative effects on NPP integrity and safety. Thus, the lack of proper exchange for different data information systems of organizations should be resolved by using an international standard data format. The standard data format can reduce the cost and time for data exchange in each phase for design, procurement, delivery, installation, operation and maintenance of equipment. The AEX(automating equipment information exchange) pilot implementation project team under EPRI advanced nuclear technology (ANT) program has been conducted a research for the use of XML equipment schemas for electronic data exchange(EDE). They applied XML equipment schema for the design, selection, quotation, purchase and mock install of a safety injection centrifugal pump using EDE standard HI(hydraulic institute) 50.7. For data exchange, FIATECH, an industry consortium, has equally developed library of templates and reference data for ISO-15926, which is an international standard capable of reducing data-error and delivery time for exchanging data among different organizations. KHNP as an only owner/operator company has not experienced much difficulty in data interoperability with other organizations, but continued its unremitting exertions to develop a robust system capable of managing data information generated in all the stages of NPP

  7. Main summaries of construction of the Rovno NPP third unit

    International Nuclear Information System (INIS)

    Smoktij, I.P.; Tsetsenko, I.K.

    1987-01-01

    The main technical and economic indices attained at the Rovno and Zaporozhe NPPs are considered. The estimated costs of the main installations of the building site, organizations participating in construction, labor forces at different building sections, duration of different stages of construction, actual labor costs associated with the reactor unit, volumes of construction and installation work, the construction schedule for the Rovno Unit-3 are given

  8. Electromagnetic compatibility of tools and automated process control systems of NPP units

    International Nuclear Information System (INIS)

    Alpeev, A.S.

    1994-01-01

    Problems of electromagnetic compatibility of automated process control subsystems in NPP units are discussed. It is emphasized, that at the stage of development of request for proposal for each APC subsystem special attention should be paid to electromagnetic situation in specific room and requirements to the quality of functions performed by the system. Besides, requirements to electromagnetic compatibility tests at the work stations should be formulated, and mock-ups of the subsystems should be tested

  9. Licensing process of the digital application: Nuclear measurement analysis and control power range neutron monitor (NUMAC-PRNM) system for their implementation in the Laguna Verde NPP unit 2

    International Nuclear Information System (INIS)

    Ledesma-Carrion, R.; Hernandez-Cortes, A.

    1998-01-01

    This paper describe the licensing process performed by the Mexican Regulatory Commission (CNSNS) for the NUclear Measurement Analysis and Control-Power Range Neutron Monitor (NUMAC-PRNM) system, which sends trip signals to the Reactor Protection System (RPS), and has been implemented in the Laguna Verde Nuclear Power Plant Unit (LVNPP-U2) before its first fuel loading. The review and approval process was performed with the advise role of the United States of America Nuclear Regulatory Commission (USNRC): the regulatory frame applied includes the Code of Federal Regulation, some Regulatory Guides and some Industrial Standards. The evaluation covered topics related with the software, hardware and firmware specifications, design, tests, training, maintenance and operational experience. After the revision of these topics, the NUMAC-PRNM was approved through the CNSNS Safety Evaluation Report (SER) and then installed in the LVNPP-U2. This paper include a description of the regulatory requirements to this digital application, the safety concerns involved, the compliance to these requirements by the utility and the results of the CNSNS evaluation, mentioning the experience acquired during the process and the method used to perform the evaluation. Additionally, the interface between the designer-vendor, the utility and the regulatory body during the licensing process is commented. Finally, the conclusion is presented, taking into account the operational experience of the NUMAC applications implemented in the LVNPP. It also gives the future regulatory tasks related to the assessment of digital performance equipment and upgrades. (author)

  10. Cernavoda NPP Unit 2: 'A year of progress'

    International Nuclear Information System (INIS)

    Cullen, Ronald G.

    2004-01-01

    available for installation. An unfortunate incident in shipping of the generator stator from the USA at the end of 2003 meant a delay in the delivery by 10 months. Through a major team effort by all concerned the unit was rebuilt and delivery successfully effected in November. All of the major obstacles have been overcome and the project is currently on schedule. The project has now completed 482 days of work without a lost time accident which is notable considering that over 4 million man-hours were worked during this period. AECL Canada and ANSALDO Energia have worked hard to support the project. The foreign engineering scope of work is nearing completion and all contract scope purchase orders have been placed with most deliveries now completed. Work still continues on procurement to support the commissioning of the plant systems. The success to date is attributed partly to providing a strong Management Team consisting of personnel who bring experience from similar projects in China, Italy and of course Cernavoda Unit 1. The client and Romanian ministry of trade and industry are fully supportive of the project and working as a team with the MT is a key element to meeting the challenges that exist on a large project such as the Cernavoda 2 Plant and has been a key factor in the success to date. The coming year will be no less demanding, by the end of 2005 virtually all systems will be transferred from the construction to the commissioning group. The key issue that will have to be addressed by the project will be acquiring sufficient site construction contractor's manpower to meet the demands imposed by the aggressive systems turn over schedule and delivery of large amounts of materials. Commissioning will also have a major challenge to keep up with some 25 systems being turned over on a monthly basis. Staffing levels for Construction Division will be reduced while a similar increase will occur in Commissioning. With the support of the client SNN the Management Team at

  11. Calculation of the real states of Ignalina NPP Unit 1 and Unit 2 RBMK-1500 reactors in the verification process of QUABOX/CUBBOX code

    International Nuclear Information System (INIS)

    Bubelis, E.; Pabarcius, R.; Demcenko, M.

    2001-01-01

    Calculations of the main neutron-physical characteristics of RBMK-1500 reactors of Ignalina NPP Unit 1 and Unit 2 were performed, taking real reactor core states as the basis for these calculations. Comparison of the calculation results, obtained using QUABOX/CUBBOX code, with experimental data and the calculation results, obtained using STEPAN code, showed that all the main neutron-physical characteristics of the reactors of Unit 1 and Unit 2 of Ignalina NPP are in the safe deviation range of die analyzed parameters, and that reactors of Ignalina NPP, during the process of the reactor core composition change, are operated in a safe and stable manner. (author)

  12. The contract for the completion and commissioning of Cernavoda NPP - Unit

    International Nuclear Information System (INIS)

    2001-01-01

    On May 18, 2001 the commercial contract for the completion and commissioning of the Cernavoda NPP Unit 2 has been signed by Nuclearelectrica National Company (SNN SA) and its partners, AECL-Canada and ANSALDO-Italy. This contract represents a continuation of the cooperation with AECL-Canada (the owner of the licence and the designer of the nuclear part of Cernavoda NPP Unit1) and ANSALDO-Italy (the designer of the conventional part of Cernavoda NPP Unit1). The completion is scheduled to last for 54 months (4.5 years) since the date the contract takes effect and the nuclear reactor start-up (the first criticality) is scheduled for the 49 th month. The total negotiated cost for the completion was estimated to amount to 689 million dollars, against the 750 million dollars initially estimated. The works at the site will be managed by an integrated staff team of specialized personnel form AECL-Canada (111 positions), ANSALDO-Italy (72 positions) and Romania (1200 positions)

  13. Modernization program of NPP Kozloduy, units 5 and 6

    International Nuclear Information System (INIS)

    Protze, M.

    2000-01-01

    A rather brief overview is given of the programme for upgrading units 5 and 6 of the Bulgarian Kozloduy plant, as it was established in 1994/95. A brief characterization is given of individual steps, either already taken or being planned. (A.K.)

  14. European cooperation under the modernization program of the Kozloduy NPP units 5 and 6 and its evolution during the Belene NPP construction

    International Nuclear Information System (INIS)

    Hoch, G.

    2005-01-01

    The major part of the modernization program for the Kozloduy NPP units 5 and 6 is being performed by the European Consortium Kozloduy (ECK), consisting of AREVA - FRAMATOME ANP (Germany and France) and Atomenergoexport (Russia). The ECK main project, consisting of 76 separate measures, shall be finished in the first half of 2006. One of the major tasks was to form the different teams on contractors and employers side such that the works can be executed effectively in a timely manner and as per the technical and quality requirements. Different actions were undertaken on both sides in order to assure the main target, namely to implement the complete scope of work within the contractual time schedule. So far it can be reported that the teams have successfully worked and as a matter of fact at present more than 100 outage days have been saved compared to the initial contractual time schedule. This important result is based on different success factors in the field of planning, engineering and design, outage organization, implementation including testing and commissioning, quality assurance. After the decision of Bulgaria to continue the erection of Belene NPP, a bidding consortium has been founded by the ECK Consortium members, in order to provide a joint offer for this project. The good reputation, expertise and the experience gained from the Kozloduy NPP units 5 and 6 modernization project together with a reliable network with Bulgarian industrial partners may contribute the utmost to a successful finalization of the Belene NPP. (author)

  15. Feasibility study for NPP Mochovce Units 3 and 4 completion

    International Nuclear Information System (INIS)

    Tomik, L.; Chakraborty, S.; Hoffelner, W.; Stoian, A.

    2004-01-01

    The system dynamic approach presented in this study by modelling the behaviour of Slovak market on the basis of system dynamic model (Forrester model), enables real mix in the extend of 12 years and helps understanding of the market limits. In addition this tool can be used for sensitivity calculations depending on many parameters to develop possible trends in the economic development of the Slovak Republic. If both nuclear power options are maintained then it becomes obvious that electric excess energy is produced and could be exported. This export option remains for the situation that a strong growth of the gross national product is assumed without any increase in energy efficiency. Between these extremes is the scenario that Bohunice 1, 2 off is balanced by Mochovce 3, 4 on and increasing demand this will lead to more moderate but still not negligible potential of CO 2 increase. Switching off Bohunice 1, 2 and not switching on Mochovce 3, 4 leads to energy need which must be counterbalanced either by investments in other power plants or by import energy. As far as domestic production is concerned even assuming 50 % CHP production leads to partly remarkable additional CO 2 -production which might infringe on a long term basis with the Kyoto goals. Assuming additional CO 2 -emissions from increasing traffic real problems can be expected in such a case. To maintain national nuclear capabilities in Slovakia is very important for today and for future of nuclear energy option in enlarged European Union. (authors)

  16. Preparation phase of Mochovce NPP unit 3 and 4 construction completion

    International Nuclear Information System (INIS)

    Cillik, I.; Tvaroska, V.; Liska, P.; Ziman, V.

    2005-01-01

    In this presentation authors deal with preparation phase of Mochovce NPP unit 3 and 4 construction completion. The preparation phase of the Mochovce unit 3 and 4 construction completion gives following main outputs: (a) Detail Safety Concept gives definitive complex safety and technical improvement of MO34, more precise analysis of the total cost of construction completion, a list of potential suppliers and construction completion time schedule; (b) Appendices of Basic Design Documentation and Preliminary SAR serves as basic documentation for UJD SR decision making according to Law No. 541 for start of Realization Phase; (c) The Preparation Phase represents effective tool for start of MO34 construction completion Realization Phase.

  17. Seismic analysis of a NPP reactor building using spectrum-compatible power spectral density functions

    International Nuclear Information System (INIS)

    Venancio Filho, F.; DeCarvalho Santos, S.H.; Joia, L.A.

    1987-01-01

    A numerical methodology to obtain Power Spectral Density Functions (PSDF) of ground accelerations, compatible with a given design response spectrum is presented. The PSDF's are derived from the statistical analysis of the amplitudes of the frequency components in a set of artificially generated time-histories matching the given spectrum. A so obtained PSDF is then used in the stochastic analysis of a NPP Reactor Building. The main results of this analysis are compared with the ones obtained by deterministic methods

  18. Continuous operation of NPP Kori Unit 1 - Fireproof paint for cables

    International Nuclear Information System (INIS)

    Wendt, Dipl-Ing. Ruediger; Kim, Duill; Sik, Cho Hong

    2008-01-01

    Fireproof cable coating materials have been used in European NPP, especially in Germany, Russia, Ukraine, Czech Republic, Lithuania, Switzerland. Wide experiences were made during operation while applying these systems. In NPP Kori, Unit 1, a fire proof cable coating project was realised for the first time in a NPP of KHNP. The scope of services of the cable trays to coat amounts to 15,587m 2 . In different fire compartments and rooms the cables should be coated partially respectively completely with the fire proof cable coating system. The extent of cable surfaces to coat was stipulated by KHNP on the basis of an analysis made by KHNP. The project was tendered on the basis of a technical specification of KHNP. The specification is mainly predicted on Korean and US standards. The most important criteria for the fire proof cable coating is resumed as follows: The fireproof cable coating has to assure the fire protection of the cables for a period defined and for operational conditions defined in such a manner that the general conditions for the operation of the cable installation will not be affected

  19. Transposition of the SQUG methodology to the Belgian NPP(nuclear power station)

    International Nuclear Information System (INIS)

    Detroux, P.; Aelbrecht, D.; Naisse, J.C.; Greer, J.L.

    1991-01-01

    The units of a Belgian Nuclear PowerStation had to be seismically reassessed after ten years of operation because the seismic requirements were upgraded from 0.1g to 0.17g free field ground acceleration. Seismic requalification of the active equipment was a critical problem as the current classical methods were too conservative and their application would have lead to unacceptable replacement or reinforcement of a lot of equipment. The approach based on the use of past experience of seismic behavior of non nuclear equipment was chosen; this methodology was developed by the Seismic Qualification Utility Group (SQUG); a group of U.S. utilities and had to be transposed to the Belgian N.P.P. This transposition is described in this paper. It affects different aspects of the methodology. First, the impact of specific requests of the Safety Authorities on the elaboration of the Safe Shutdown Equipment List (SSEL) shall be examined. Then it is explained why the tedious work of specific relay screening was avoided by taking advantage of initial design features for both Instrumentation and Control (I and C) and Electrical power distribution system; the impact on the Electrical SSEL is also described. Afterwards, it is presented how it was possible to conduct a specific existing seismic qualification at 0.1 g free field ground acceleration. Finally, the resolution of specific important problems that arose from the application of the SQUG methodology, is presented such as the definition of the grade level and the conservatism of the classical Amplified Floor Spectra (criterion 1), the calculation of the nozzle loads on mechanical equipment connected to long unbraced piping and the transfer of these loads to the anchorage. (author)

  20. Assessment of the state of modernization of NPP Kozloduy units 3 and 4

    International Nuclear Information System (INIS)

    Horstmann, R.

    2002-01-01

    The status of the implemented modernization programmes for the Kozloduy NPP is presented. The Three Stage Term Modernization Program for units 1-4 has been implemented between 1991 and 1997 and includes the installation of new safety systems and components such as pressurized safety valves, main steam safety valves, complementary emergency feedwater system, second fire fighting system etc. The total investment od the Program amounted to 129.1 mill. ECU. The Complex Modernization Program for units 1-4 has been developed 1996 -1997 and further updated in 2000. The total investment necessary for the implementation are assessed at about 66 mill. USD. The safety assessment shows that due to the modernization programs the units have been upgraded to additional accident management capabilities. The reactor confinement has been fundamentally improved by the Jet Vortex Condenser System. PSA has been also conducted for the units 3 and 4

  1. Leningrad NPP and energetics of north-western Russia

    International Nuclear Information System (INIS)

    Belov, I.

    2000-01-01

    Problems of Leningrad NPP operating units modernization, their design service life finishing by year of 2010, are discussed. To assure safe operation of unit 1 investments in the amount of 30 mln. dol are necessary. Estimations suggest economic efficiency of the measures, permitting saving of 300 mln. dol worth of gas. Unfortunately, without a rise in tariff for electric power produced by NPP it seems impossible. It is recommended that substantiated tariffs are set for electric power produced by NPP starting from January, 2000. The measure is indispensable for raising investment funds intended for operating NPP modernization [ru

  2. Project realization of jet vortex condenser at units 3 and 3 of the Kozloduy NPP

    International Nuclear Information System (INIS)

    Genovski, I.; Grigorov, A; Bonev, B; Sabinov, S.; Petkov, M.

    2003-01-01

    In the implementation of the contract between the Kozloduy NPP and Department 'Thermal and Nuclear Energy' at the Technical University, Sofia a project has been realized for the demonstration of the modernization of the system for accident localization in the units 3 and 4, based on the jet-vortex condenser (JVC). The final result is multimedia presentation in English and Bulgarian languages. In this paper the last part of the project is presented, including: installing of the JVC, auxiliary systems, executors of the project and expert opinions on the projects

  3. Calculation of the effectiveness of manual control rods for the reactor of Ignalina NPP Unit 2

    International Nuclear Information System (INIS)

    Bubelis, E.; Pabarcius, R.

    2001-01-01

    On the basis of one of the recent databases of the reactor of Ignalina NPP Unit 2, calculations of the effectiveness of separate manual control rods, groups of manual control rods and axial characteristic of effectiveness of separate manual control rods were performed. The results of the calculations indicated, that all analyzed separate manual control rods have approximately the same effectiveness, which doesn't depend on the location of a control rod in the reactor core layout Manual control rod of the new design has about 10% greater effectiveness than manual control rod of the old design. (author)

  4. Some results of periodical analysis of the behavior of unit 4 at the Dukovany NPP - II

    International Nuclear Information System (INIS)

    Jirsa, P.

    1993-01-01

    The results of a detailed spectral analysis of noise signals recorded at the unit 4 reactor of the Dukovany NPP during and after the start-up stage are presented. The changes in the noise source signal spectra during the start-up and in normal operation were evaluated by multidimensional autoregression analysis. The temperature dependence of the signal spectra peaks from individual detectors is described. The sources of the peaks at 27.9 and 37 Hz during normal operation were identified as standing pressure waves in the primary circuit of the reactor. 3 tabs., 23 figs., 6 refs

  5. Seismic response analysis and upgrading design of pump houses of Kozloduy NPP units 5 and 6

    International Nuclear Information System (INIS)

    Jordanov, M.; Marinov, M.; Krutzik, N.

    2001-01-01

    The main objective of the presented project was to perform a feasibility study for seismic/structural evaluation of the safety related structures at Kozloduy NPP Units 5 and 6 for the new site seismicity and determine if they satisfy current international safety standards. The evaluation of the Pump House 3 (PH3) building is addressed in this paper, which was carried out by applying appropriate modeling techniques combined with failure mode and seismic margin analyses. The scope of the work defined was to present the required enhancement of the seismic capacity of the Pump House structures.(author)

  6. Expert system for operational personnel support during power unit operation control in regulation range

    International Nuclear Information System (INIS)

    Yanitskij, V.A.

    1992-01-01

    The problems met when developing the systems for NPP operator support in the process of power unit operation are considered. The expert system for NPP personnel intelligent support combining the properties belonging to the artificial intelligence systems including selection of the analysis method taking into account the concrete technological situation and capability of application of algothmic calculations of the equipment characteristics using the information accumulated during the system development, erection and operation is described

  7. Cernavoda NPP Unit 1: Ensuring heat sink at very low Danube river levels

    International Nuclear Information System (INIS)

    Urjan, D.

    2005-01-01

    Full text: On August 24, 2003 the summer heat wave has caused the Danube River to drop to its lowest level in more than a century, forcing a government commission of experts and a team of technical specialists from Cernavoda NPP to close Romania's unique nuclear reactor in operation at Cernavoda. The paper presents some of the required actions needed for plant shutdown and ensuring adequate fuel cooling at very low suction bay levels, due to the Danube River level drop (Danube waters cools the reactor). The water level in the Danube River at Cernavoda village, where the reactor is located, fell to a depth of less than three meters (10 feet) on Saturday, down from its usual level of almost seven meters (23 feet). Consequently, the Unit 1 nuclear power plant was shut down Sunday due to this record drought, which left insufficient water to cool down the reactor. Operating Instruction procedures were elaborated in order to provide a logical sequence of actions when the bay level decreases under 2.25 m, or the estimated level after 3 days will be lower than 1.8 m. When Raw Service Water (RSW) is lost, Recirculated Cooling Water (RCW) will remain in service only for Moderator, ESC, HT Pumps, HT Purification, D/C Cooler, LAC's, and D 2 O Feed Pump. Alternate water sources, like potable water and water from the fire protection system were taken in consideration in order to ensure heat sink to the RCW loads. At the same time, in case of total loss of Class III and Class IV Power, and Stand-By Diesel Generators unavailable because of the loss of heat sink provided by the RSW, Emergency Power System (EPS) was configured to supply directly the Class III Power 6 kV bus (BUG bus). Economical Impact According to a report, closing the nuclear plant costs Romania $500,000 a day. The total cost includes also losses due to a 40 percent reduction in hydroelectric power generation due to reduced river flow. The country had to cease power exports until the reactor comes back on line

  8. Experience in lifetime extension of the first generation WWER-440 power units

    International Nuclear Information System (INIS)

    Medvedev, P.

    2002-01-01

    In connection with the expiration of the lifetime for the first generation WWER-440 reactors in Russian Federation (Novo Voronezh and Kola NPP), the legal procedures and Life Time Extension (LTE) Program are discussed. The LTE Program includes: development of regulation basis; economic efficiency studies; power unit modernization; power unit comprehensive examination and justification od equipment resource; in-dept safety assessment; operational license acquisition. As a result from the LTE Program the safety level of the unit 3 of the Novo Voronezh NPP is significantly increases, the operational period has been justified and a 5-year license has been issued

  9. Mobile power plant units

    Energy Technology Data Exchange (ETDEWEB)

    Radtke, R

    1979-10-05

    Diesel engines of the MaK line 282 AK/332 with a cylinder power up to 160 kW are used, either as 6-cylinder or 8-cylinder in-line engine or as 12-cylinder V engine. Fuel consumption is between 207 and 212 g/kW. The engine is mounted on a frame, together with a generator. The fuel reserve in the tank will last for 8 hours. The lubricating system, the cooling water and starting air system, the switchboard system, and the frame are described. The switchboard plant is mounted either on a skid undercarriage or on the undercarriage. The plant can be operated independently or parallel to the network. The unit can be remote-controlled via push buttons or control knobs. A picture is presented of a mobile diesel aggregate which is in service in Libya.

  10. Dukovany NPP operation

    International Nuclear Information System (INIS)

    Vlcek, Jaroslav

    2010-01-01

    The topics discussed include: Dukovany NPP among CEZ Group power plants; International missions at the plant; Plant operation results; and Strategic goals and challenges. Historical data are presented in the graphical form, such as the unit capacity factor, unplanned capability loss factor, unplanned automatic scrams, fuel reliability, industrial safety accident rate, collective radiation exposure, WANO index, power generation data, and maximum achievable power by the end of year. Also discussed were the company culture and human resources, maintenance, power uprate, and related phenomena. (P.A.)

  11. Project Management Unit for decommissioning of NPP Bohunice VI (2003-2014)

    International Nuclear Information System (INIS)

    Gonzalez Fernandez-conde, A.; Brochet, I.; Ferreira, A.

    2015-01-01

    From October 2003 until december 2014 the Consortium consisting of Iberdrola Engineering and Construction (leader). Empresarios Agrupados Internacional, and Indra Sistemas has carried out the project Project Management Unit ((PMU) for the decommissioning of Bohunice V1 NPP (units 1 and 2), type VVER-440/V-230 in Slovakia. during the first phase (2003-2007) EdF was also part of the Consortium. The project is funded by the Bohunice International Decommissioning Support Fund (BIDSF) administered by the RBRD. The main objective of the project is to provide the necessary engineering and resources of project management for planning, execution, management, coordination and monitoring of all tasks in support of the decommissioning. (Author)

  12. Informing the Lithuanian public about the decommissioning of Unit 1 at Ignalina NPP

    International Nuclear Information System (INIS)

    Medeliene, D.; Alvers, M.

    2001-01-01

    The final decision about decommissioning of Unit 1 at Ignalina NPP by 2005 was taken when the Lithuanian Parliament approved the National Energy Strategy in 1999. In 2000 the Board of the European Bank of Research and Development (EBRD) approved the establishment of the Ignalina International Decommissioning Support Fund and the International Donors' Conference took place in Vilnius. Sweden's longterm co-operation with Lithuania in the area of nuclear safety started already in 1992, soon after the country had regained its independence. SIP (Swedish International Project Nuclear Safety) administers this bilateral assistance. Public information has been included in the Swedish programme since the establishment of the Information Centre at INPP and is also a part of the bilateral decommissioning support. SIP finances a series of TV-programmes on a national channel and the local cable TV in Visaginas (the town close to Ignalina NPP) about various aspects of decommissioning. The Lithuanian regulatory authority VATESI uses its experience in public relations to inform about the situation related with decommissioning. The authority organizes 'Open Doors' days and press conferences to provide objective and trustworthy information. The reaction of the viewers to the TV-programmes were very positive and Sweden will continue the support to the information programme in Lithuania. (author)

  13. Rest lifetime evaluation and ageing management in NPP 'Kozloduy' unit 1-4

    International Nuclear Information System (INIS)

    Erve, M.; Heck, R.; Schmidt, J.; Daum, G.; Bataklieva, L.; Stoev, M.

    1999-01-01

    In 1992 as a result of an IAEA SRM review the 'WANO 6-month program' has been issued to improve operation, maintenance nad safety culture for the four WWER 440/230 units at the NPP 'Kozloduy' Siemens has awarded 3 contracts related to RTL evaluation of the main equipment, integrity of reactor pressure vessel and to the leak-before-break behaviour of the main piping od unit 2. It is pursuit an overall strategy that allows to: implement on the basis of RTL evaluation a long term ageing management program (AMAP) for Kozloduy's units 1-4 to assure their operation until the end of their design life; identify those components and equipment for which from the safety point of view urgent and immediate actions have to be performed; increase step by step the safety and reliability according to the Western standards and to internationally accepted safety culture; keep open the possibility of life extension as far as this would be technically feasible and acceptable and economically reasonable. Under the technical leadership of Siemens studies have been performed related to the subject of integrity and RTL, such as: reirradiation of RPV samples from Unit 1 and 2; evaluation of PV embrittlement of Unit 1; transfer of the results of LBB assessment of Unit 2 to Units 1, 3 and 4; transfer of results of RTL evaluation of Unit 2 to Units 1, 3 and 4; PTS analysis of RPV of Unit 1, 2,3 and 4. The main remarkable results are: no life-limiting mechanisms detected, requiring immediate actions, except for RPVs; residual lifetime determined for RPVs on reliable basis of advanced modern PTS analysis and sample testing; necessary activities in monitoring of ageing and in-service inspection clearly identified successful proof of lBB for main primary piping after slight modification of supports; international experts agreement reached (e.g. Risk Audit, successful IAEA experts meetings and OSART missions)

  14. Modernization and safety improvement project of the NPP V-2 Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Michal, V.; Losonsky, B.; Magdolen, J.

    2000-01-01

    This contribution deals with the form, present state, and results of the Nuclear Power Plants Research Institute (the Slovak acronym is VUJE - Vyskumny Ustav Jadrovych Elektrarni) participation in the NPP V-2 Jaslovske Bohunice Modernization and Safety Improvement Project. A short description of VUJE history, activity, and results is also presented as well as NPPs Jaslovske Bohunice characterization. VUJE was established in 1977 and deals with scientific and research needs of nuclear power plants, such as design, construction, commissioning and operation. The next fields of VUJE activity are, NPP reconstruction, NPP personnel training, radioactive waste management technology, and NPP decommissioning. The nuclear power plant, Jaslovske Bohunice, is situated approximately 15 km from the district town of Trnava in the southwestern region of the Slovak Republic. The construction of the first Czechoslovak NPP A-1 began on this site in 1957 .The construction of the double-unit NPP V-1 with WWER-440 (type V-230) reactor began in 1972. The first unit of NPP V-1 began operation in 1978 and the second in 1980. NPPs construction on the Bohunice site continued with NPP V-2, which has two units with WWER-440 (type V-213) reactors. Unit 1 and Unit 2 of NPP V-2 were commissioned in 1984 and 1985, respectively. Slovak electric utility Slovenske elektrarne (SE) is the owner/commissioner of NPP V-2. This NPP is responsible for more than 20% of the total electrical energy production of SE, making it an essential supporter of the Slovak economy. (authors)

  15. Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction

    International Nuclear Information System (INIS)

    Kim, Woojoong; Ryu, Dongsoo; Jung, Youngsoo

    2014-01-01

    Highlights: • Mixed use of linear scheduling method with traditional CPM is suggested for NPP. • A methodology for selecting promising areas for LSM application is proposed. • A case-study is conducted to validate the proposed LSM selection methodology. • A case-study of reducing NPP construction duration by using LSM is introduced. - Abstract: According to a forecast, global energy demand is expected to increase by 56% from 2010 to 2040 (EIA, 2013). The nuclear power plant construction market is also growing with sharper competition. In nuclear power plant construction, scheduling is one of the most important functions due to its large size and complexity. Therefore, it is crucial to incorporate the ‘distinct characteristics of construction commodities and the complex characteristics of scheduling techniques’ (Jung and Woo, 2004) when selecting appropriate schedule control methods for nuclear power plant construction. However, among various types of construction scheduling techniques, the traditional critical path method (CPM) has been used most frequently in real-world practice. In this context, the purpose of this paper is to examine the viability and effectiveness of linear scheduling method (LSM) applications for specific areas in nuclear power plant construction. In order to identify the criteria for selecting scheduling techniques, the characteristics of CPM and LSM were compared and analyzed first through a literature review. Distinct characteristics of nuclear power plant construction were then explored by using a case project in order to develop a methodology to select effective areas of LSM application to nuclear power plant construction. Finally, promising areas for actual LSM application are suggested based on the proposed evaluation criteria and the case project. Findings and practical implications are discussed for further implementation

  16. Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Woojoong, E-mail: minidung@nate.com [Central Research Institute, Korea Hydro and Nuclear Power Co., Ltd, Daejeon 305-343 (Korea, Republic of); Ryu, Dongsoo, E-mail: energyboy@khnp.co.kr [Central Research Institute, Korea Hydro and Nuclear Power Co., Ltd, Daejeon 305-343 (Korea, Republic of); Jung, Youngsoo, E-mail: yjung97@mju.ac.kr [College of Architecture, Myongji University, Yongin 449-728 (Korea, Republic of)

    2014-04-01

    Highlights: • Mixed use of linear scheduling method with traditional CPM is suggested for NPP. • A methodology for selecting promising areas for LSM application is proposed. • A case-study is conducted to validate the proposed LSM selection methodology. • A case-study of reducing NPP construction duration by using LSM is introduced. - Abstract: According to a forecast, global energy demand is expected to increase by 56% from 2010 to 2040 (EIA, 2013). The nuclear power plant construction market is also growing with sharper competition. In nuclear power plant construction, scheduling is one of the most important functions due to its large size and complexity. Therefore, it is crucial to incorporate the ‘distinct characteristics of construction commodities and the complex characteristics of scheduling techniques’ (Jung and Woo, 2004) when selecting appropriate schedule control methods for nuclear power plant construction. However, among various types of construction scheduling techniques, the traditional critical path method (CPM) has been used most frequently in real-world practice. In this context, the purpose of this paper is to examine the viability and effectiveness of linear scheduling method (LSM) applications for specific areas in nuclear power plant construction. In order to identify the criteria for selecting scheduling techniques, the characteristics of CPM and LSM were compared and analyzed first through a literature review. Distinct characteristics of nuclear power plant construction were then explored by using a case project in order to develop a methodology to select effective areas of LSM application to nuclear power plant construction. Finally, promising areas for actual LSM application are suggested based on the proposed evaluation criteria and the case project. Findings and practical implications are discussed for further implementation.

  17. Public debates - key issue in the environmental licensing process for the completion of the Cernavoda NPP Unit 2

    International Nuclear Information System (INIS)

    Rotaru, Ioan; Jelev, Adrian

    2003-01-01

    SN 'NUCLEARELECTRICA' S.A., the owner of Cernavoda NPP, organized, in 2001, several public consultations related to environmental impact of the completion of the Cernavoda NPP Unit 2, as required by the Romanian environmental law, part of project approval. Public consultations on the environmental assessment for the completion of the Cernavoda NPP - Unit 2 took place in 2001 between August 15 and September 21 in accordance with the provisions of Law No. 137/95 and Order No. 125/96. Romanian environmental legislation, harmonization of national environmental legislation with European Union, Romanian legislative requirements, information distributed to the public, issues raised and follow-up, they all are topics highlighted by this paper and they are addressing the environmental licensing process of the Cernavoda 2 NPP. The public consultation process described fulfils all the Romanian requirements for carrying out meaningful consultation with its relevant shareholders. The process also satisfies EDC (Export Development Corporation - Canada) requirements for public consultation and disclosure with relevant shareholders in the host country. SNN is fully committed to consulting as necessary with relevant shareholders throughout the construction and operation of the Project. Concerns of the public have been taken into account with the operations of Unit 1 and will continue to be addressed during the Unit 2 Project

  18. Radioactive dispersion analysis for hypothetical nuclear power plant (NPP) candidate site in Perak state, Malaysia

    Science.gov (United States)

    Shamsuddin, Shazmeen Daniar; Basri, Nor Afifah; Omar, Nurlyana; Koh, Meng-Hock; Ramli, Ahmad Termizi; Saridan Wan Hassan, Wan Muhamad

    2017-10-01

    Malaysia is planning to build a nuclear power plant (NPP) by 2030 to diversify the national electricity supply and resources. Selection of an NPP site must consider various factors, especially nuclear safety consideration to fulfil the nuclear safety objectives. Environmental Risk Assessment Analysis is a part of safety requirements by the International Atomic Energy Agency (IAEA) prior to the NPP commissioning process. Risk Assessments Analysis (RIA) is compulsory for the NPP site evaluation. One of RIA methods are Radioactive Dispersion Analysis using probabilistic risk analysis software. It is also important to perform studies to estimate the impact to the neighbouring population in the case of a nuclear accident at the power plant. In the present work, aimed to study the impact of a hypothetical nuclear accident by simulating the dispersion pattern of radionuclides originated from a candidate site at Manjung, Perak. The work has been performed using the HotSpot Health Physics codes. Two types of radionuclides have been considered namely 137Cs and 131I. In calculations, the initial concentration of radioactive materials of Fukushima Daiichi accident data are used which are 2.06 x 1016 Bq and 1.68 x 1017 Bq respectively for the two radionuclides. The result shows that the dispersion distance obtained from both software are not the same. It shows that 137Cs and 131I can be dispersed as far as 16 km and 80 km away from the site during radiological accident respectively, reaching major towns in Perak. Using HOTSPOT, the estimated total effective dose equivalent (TEDE) for 137Cs and 131I at major towns in Perak such as Lumut and Sitiawan are 1.2 mSv and 9.9 mSv. As for Taiping, Ipoh, Kampar, and Teluk Intan the estimated TEDE is around 0.2 mSv and 1.6 mSv respectively. In conclusion, the dispersion can reach as far as 80 km from the site. However, estimated annual effective dose is not more than 1 mSv limit, which is considered acceptable in the point of view of

  19. Radioactive dispersion analysis for hypothetical nuclear power plant (NPP candidate site in Perak state, Malaysia

    Directory of Open Access Journals (Sweden)

    Shamsuddin Shazmeen Daniar

    2017-01-01

    Full Text Available Malaysia is planning to build a nuclear power plant (NPP by 2030 to diversify the national electricity supply and resources. Selection of an NPP site must consider various factors, especially nuclear safety consideration to fulfil the nuclear safety objectives. Environmental Risk Assessment Analysis is a part of safety requirements by the International Atomic Energy Agency (IAEA prior to the NPP commissioning process. Risk Assessments Analysis (RIA is compulsory for the NPP site evaluation. One of RIA methods are Radioactive Dispersion Analysis using probabilistic risk analysis software. It is also important to perform studies to estimate the impact to the neighbouring population in the case of a nuclear accident at the power plant. In the present work, aimed to study the impact of a hypothetical nuclear accident by simulating the dispersion pattern of radionuclides originated from a candidate site at Manjung, Perak. The work has been performed using the HotSpot Health Physics codes. Two types of radionuclides have been considered namely 137Cs and 131I. In calculations, the initial concentration of radioactive materials of Fukushima Daiichi accident data are used which are 2.06 x 1016 Bq and 1.68 x 1017 Bq respectively for the two radionuclides. The result shows that the dispersion distance obtained from both software are not the same. It shows that 137Cs and 131I can be dispersed as far as 16 km and 80 km away from the site during radiological accident respectively, reaching major towns in Perak. Using HOTSPOT, the estimated total effective dose equivalent (TEDE for 137Cs and 131I at major towns in Perak such as Lumut and Sitiawan are 1.2 mSv and 9.9 mSv. As for Taiping, Ipoh, Kampar, and Teluk Intan the estimated TEDE is around 0.2 mSv and 1.6 mSv respectively. In conclusion, the dispersion can reach as far as 80 km from the site. However, estimated annual effective dose is not more than 1 mSv limit, which is considered acceptable in the point

  20. Main features of the unit 1-4 building complex, Kozloduy NPP in respect to seismic safety

    Energy Technology Data Exchange (ETDEWEB)

    Kostov, M; Boncheva, H; Stafanov, D [Central Laboratory for Seismic Mechanics and Earthquake Engineering, Bulgarian Academy of Sciences, Sofia (Bulgaria)

    1993-07-01

    The Units 1 and 2 of Kozloduy NPP were originally designed to resist a IV-V degree MSK earthquake. They have been subsequently upgraded for a VII degree earthquake. Since that structure basically do not meet the safety requirements to resist the new earthquake with a maximum acceleration of 0.2 g and very broad spectrum. The performed analyses are clearly pointing out that an upgrading for the new earthquake level is possible. The problems common for all the structures of Kozloduy NPP are summarized in this presentation.

  1. Main features of the unit 1-4 building complex, Kozloduy NPP in respect to seismic safety

    International Nuclear Information System (INIS)

    Kostov, M.; Boncheva, H.; Stafanov, D.

    1993-01-01

    The Units 1 and 2 of Kozloduy NPP were originally designed to resist a IV-V degree MSK earthquake. They have been subsequently upgraded for a VII degree earthquake. Since that structure basically do not meet the safety requirements to resist the new earthquake with a maximum acceleration of 0.2 g and very broad spectrum. The performed analyses are clearly pointing out that an upgrading for the new earthquake level is possible. The problems common for all the structures of Kozloduy NPP are summarized in this presentation

  2. New generation nuclear power units of PWR type integral reactors

    International Nuclear Information System (INIS)

    Mitenkov, F.M.; Kurachen Kov, A.V.; Malamud, V.A.; Panov, Yu.K.; Runov, B.I.; Flerov, L.N.

    1997-01-01

    Design bases of new generation nuclear power units (nuclear power plants - NPP, nuclear co-generation plants - NCP, nuclear distract heating plants - NDHP), using integral type PWPS, developed in OKBM, Nizhny Novgorod and trends of design decisions optimization are considered in this report. The problems of diagnostics, servicing and repair of the integral reactor components in course of operation are discussed. The results of safety analysis, including the problems of several accident localization with postulated core melting and keeping corium in the reactor vessel and guard vessel are presented. Information on experimental substantiation of the suggested plant design decisions is presented. (author)

  3. Boat sampling and inservice inspections of the reactor pressure vessel weld No. 4 at Kozloduy NPP, Unit 1

    International Nuclear Information System (INIS)

    Cvitanovic, M.; Oreb, E.; Mudronja, V.; Zado, V.; Bezlaj, H.; Petkov, M.; Gledatchev, J.; Radomirski, S.; Ribarska, T.; Kroes, B.

    1999-01-01

    The paper deals with reactor pressure vessel (RPV) boat sampling performed at Kozloduy Nuclear Power Plant, Unit 1, from August to November 1996. Kozloduy NPP, Unit 1 has no reactor vessel material surveillance program. Changes in the material fracture toughness resulting from the fast neutron irradiation which cannot be monitored without removal of the vessel material. Therefore, the main objective of the project was to cut samples from the RPV wall in order to obtain samples of the RPV material for further structural analyses. The most critical area, i.e. weld No. 4 was determined as a location for boat sampling. Replication technique was applied in order to obtain precise determination of the weld geometry necessary for positioning of the cutting tool prior to boat sampling, and determination of divot depth left after boat sampling and grinding of sample sites. Boat sampling was performed by electrical discharge machining (EDM). Grinding of sample sites was implemented to minimize stress concentration effects on sample sites, to eliminate surface irregularities resulting from EDM process, and to eliminate recast layer on the surface of the EDM cut. Ultrasonic, liquid penetrant, magnetic particles, and visual examinations were performed after grinding to establish baseline data in the boat sampling area. The project preparation activities, apart from EDM process, and the site organization lead was entrusted to INETEC. The activities were funded by the PHARE program of the European Commission. (orig.)

  4. Estimation of the loss of Offsite power frequency for the probabilistic safety assessment of the Juragua NPP

    International Nuclear Information System (INIS)

    Vilaragut Llanes, J.J.; Valhuerdi Debesa, C.

    1996-01-01

    The loss offsite power is defined as the interruption of the preferred power supply to the essential and non essential switchgear buses necessitating or resulting in the use of emergency AC power supply. Because many safety system required for reactor core decay heat removal and containment heat removal depend on AC power, a loss of offsite power, if emergency power supply (diesel generators) fails, could be severe accidents The purpose of this work was to determine, for the Probabilistic Safety Assessment of the Juragua NPP, the causes, frequency and duration relationships of the loss of offsite power. A description is presented of the different factor that determine the occurrence of this event and the characteristics for the Juragua NPP

  5. Regulatory aspects of NPP safety

    International Nuclear Information System (INIS)

    Kastchiev, G.

    1999-01-01

    Extensive review of the NPP Safety is presented including tasks of Ministry of Health, Ministry of Internal Affairs, Ministry of Environment and Waters, Ministry of Defense in the field of national system for monitoring the nuclear power. In the frame of national nuclear safety legislation Bulgaria is in the process of approximation of the national legislation to that of EC. Detailed analysis of the status of regulatory body, its functions, organisation structure, responsibilities and future tasks is included. Basis for establishing the system of regulatory inspections and safety enforcement as well as intensification of inspections is described. Assessment of safety modifications is concerned with complex program for reconstruction of Units 1-4 of Kozloduy NPP, as well as for modernisation of Units 5 and 6. Qualification and licensing of the NPP personnel, Year 2000 problem, priorities and the need of international assistance are mentioned

  6. The virtual digital nuclear power plant: A modern tool for supporting the lifecycle of VVER-based nuclear power units

    Science.gov (United States)

    Arkadov, G. V.; Zhukavin, A. P.; Kroshilin, A. E.; Parshikov, I. A.; Solov'ev, S. L.; Shishov, A. V.

    2014-10-01

    The article describes the "Virtual Digital VVER-Based Nuclear Power Plant" computerized system comprising a totality of verified initial data (sets of input data for a model intended for describing the behavior of nuclear power plant (NPP) systems in design and emergency modes of their operation) and a unified system of new-generation computation codes intended for carrying out coordinated computation of the variety of physical processes in the reactor core and NPP equipment. Experiments with the demonstration version of the "Virtual Digital VVER-Based NPP" computerized system has shown that it is in principle possible to set up a unified system of computation codes in a common software environment for carrying out interconnected calculations of various physical phenomena at NPPs constructed according to the standard AES-2006 project. With the full-scale version of the "Virtual Digital VVER-Based NPP" computerized system put in operation, the concerned engineering, design, construction, and operating organizations will have access to all necessary information relating to the NPP power unit project throughout its entire lifecycle. The domestically developed commercial-grade software product set to operate as an independently operating application to the project will bring about additional competitive advantages in the modern market of nuclear power technologies.

  7. Power conditioning unit for photovoltaic power systems

    Science.gov (United States)

    Beghin, G.; Nguyen Phuoc, V. T.

    Operational features and components of a power conditioning unit for interconnecting solar cell module powers with a utility grid are outlined. The two-stage unit first modifies the voltage to desired levels on an internal dc link, then inverts the current in 2 power transformers connected to a vector summation control to neutralize harmonic distortion up to the 11th harmonic. The system operates in parallel with the grid with extra inductors to absorb line-to-line voltage and phase differences, and permits peak power use from the PV array. Reactive power is gained internally, and a power system controller monitors voltages, frequencies, and currents. A booster preregulator adjusts the input voltage from the array to provide voltage regulation for the inverter, and can commutate 450 amps. A total harmonic distortion of less than 5 percent is claimed, with a rating of 5 kVA, 50/60 Hz, 3-phase, and 4-wire.

  8. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  9. On-the-job training and qualification of nuclear power plant personnel. OJT at the Loviisa NPP

    International Nuclear Information System (INIS)

    1996-01-01

    On-the-job training and qualification process of nuclear power plant personnel is described, including the following issues: educational system of technical studies in Finland; training methods at the Loviisa NPP; on-the-job training of control room operators,field operators, maintenance personnel, other groups of the plant; qualifying examinations for different jobs

  10. NPP life management (abstracts)

    International Nuclear Information System (INIS)

    Litvinskij, L.L.; Barbashev, S.V.

    2002-01-01

    Abstracts of the papers presented at the International conference of the Ukrainian Nuclear Society 'NPP Life Management'. The following problems are considered: modernization of the NPP; NPP life management; waste and spent nuclear fuel management; decommissioning issues; control systems (including radiation and ecological control systems); information and control systems; legal and regulatory framework. State nuclear regulatory control; PR in nuclear power; training of personnel; economics of nuclear power engineering

  11. Analysis of electrical systems from Cernavoda NPP - Unit 1 based on commissioning activity

    International Nuclear Information System (INIS)

    Goia, M.L.; Manolescu, I.

    1996-01-01

    Several design solutions regarding the electrical part of Cernavoda NPP Unit 1 station auxiliaries are discussed in this paper. The solutions mentioned may have different variants which should be taken into consideration in the design of Units U2 - U5. This work offers an ample debate on such matters as the supply source connection of the station auxiliaries, the use of two different voltages for the mean voltage (MV) supply, the consequence of the lack of breakers on the 24 kV part of station auxiliary transformers T03 - T04, the protection devices non correlated with the breakers to which they react, as well as the consequences of low subtransient reactance of the new stand-by Diesel generators. Besides these design solutions that can influence the station auxiliaries reliability, matters as malfunctioning of the dry type MV/LV transformers and unreliable behaviour of some MV composite insulators are also discussed. For some of the above mentioned problems the authors proposed several solutions. (authors). 1 fig., 1 tab

  12. Financial feasibility analysis on small medium reactor nuclear power plant (SMR NPP) project in Indonesia under uncertainty

    International Nuclear Information System (INIS)

    Nuryanti; Suparman; Mochamad Nasrullah; Elok Satiti Amitayani; Wiku Lulus Widodo

    2015-01-01

    NPP SMR is one alternative to overcome the Outside Java Bali region's dependence on diesel power plant. One crucial issue in the NPP project (including SMR) would be financing, associated with the capital-intensive nature of the project. In addition, the SMR NPP project also be vulnerable in occurrence of some uncertainties. Therefore, this study aimed to analyze the financial feasibility of SMR NPP project by accommodating the possibility of the uncertainties. The methodology used is probabilistic analysis which was performed by Monte Carlo technique. This technique simulates the relationship between the uncertainty variables with financial feasibility indicators. The results showed that in probabilistic approach, SMR NPP project is considered feasible on the 'most probable value' of electricity selling price of 15 cents/kWh, indicated by positive average value of NPV (US$ 135,324,004) and the average value of both of IRRs are bigger than MARR (IRR project = 10.65 %, IRR Equity = 14.29 %, while MARR = 10 %). The probability of rejection of the SMR project was about 20 %. The three main variables that are most influential in the project were: selling price of electricity, investment cost and inflation rate. (author)

  13. The nuclear power plant maintenance personnel reliability prediction (NPP/MPRP) effort at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.

    1982-01-01

    Human errors committed during maintenance activities are potentially a major contribution to the overall risk associated with the operation of a nuclear power plant (NPP). An NRC-sponsored program at Oak Ridge National Laboratory is attempting to develop a quantitative predictive technique to evaluate the contribution of maintenance errors to the overall NPP risk. The current work includes a survey of the requirements of potential users to ascertain the need for and content of the proposed quantitative model, plus an initial job/task analysis to determine the scope and applicability of various maintenance tasks. In addition, existing human reliability prediction models are being reviewed and assessed with respect to their applicability to NPP maintenance tasks. This paper discusses the status of the program and summarizes the results to date

  14. Four years Re-Use of low burned fuel assemblies from units 1 and 2 in core loadings of units 3 and 4 WWER-440 at Kozloduy NPP

    International Nuclear Information System (INIS)

    Stoyanova, I.; Antov, A.; Spasova, V.

    2006-01-01

    At the end of 2002 units 1 and 2 of Kozloduy NPP were shutdown before their design life time which left a large number of assemblies yet with a significant energy resources. A decision to load these assemblies into the cores of Units 3 and 4 during the next 4 cycles has been taken. In 2003, 43 assemblies from Unit 1 cycle 23 rd and 55 assemblies from Unit 2 cycle 24 th are loaded in the cores of units 3 and 4 respectively. In 2004, new 49 assemblies from Unit 1 cycle 23rd and new 55 assemblies from Unit 2 cycle 24th are loaded in the cores of units 3 and 4 respectively. In 2005, the next new 25 assemblies from Unit 1 cycle 23 rd and 66 assemblies from Unit 2 cycle 24th are loaded in the cores of units 3 and 4 respectively. In 2006, the next new 54 assemblies from Unit 1 cycle 23 rd and 52 assemblies from Unit 2 cycle 24 th + 2 assemblies from Unit 3 cycle 19th are loaded in the cores of Units 3 and 4 respectively. The SPPSHB computer code system is used for development and safety assessment of the fuel loading patterns of Units 3 and 4 at Kozloduy NPP with low burned assemblies from units 1 and 2 (Authors)

  15. Development of Highly Survivable Power and Communication System for NPP Instruments under Severe Accident

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Seung J.; Gu, Beom W.; Nguyen, Duy T.; Choi, Bo H.; Rim, Chun T. [KAIST, Daejeon (Korea, Republic of); Lee, So I. [KHNP CRI, Daejeon (Korea, Republic of)

    2014-10-15

    According to the detail report from the Fukushima nuclear accident, the failure of conventional instruments is mainly due to the following reasons. 1) Insufficient backup battery capacity after the station black out (SBO) 2) The malfunction or damage of instruments due to the extremely harsh ambient condition after the severe accident 3) The cut-off of power and communication cable due to the physical shocks of hydrogen explosion after the severe accident Since the current equipment qualification (EQ) for the NPP instruments is based on the design basis accident such as loss of coolant accident (LOCA), conventional instruments, which are examined under EQ condition, cannot guarantee their normal operation during the severe accident. A 7m-long-distance wireless power transfer and a radio frequency (RF) communication were introduced with conventional wired system to increase a redundancy. A heat isolation box and a harness are adopted to provide a protection from the expected physical shocks such as missiles and drastic increase of ambient temperature and pressure. A detail design principle of the highly survivable power and communication system, which has 4 sub-systems of a DCRS wireless power transfer, a Zigbee wireless communication, a GFRP harness, and a passive type router with a fly back regulator, has been presented in this paper. Each sub-system has been designed to have a robust operation characteristic regardless of the estimated physical shocks after the severe accident.

  16. Studies of Effect Analysis of Electromagnetic Pulses (EMP) in Operating Nuclear Power Plants (NPP)

    Energy Technology Data Exchange (ETDEWEB)

    Ye, Song Hae; Ryu, Ho Sun; Kim, Min Yi; Lee, Eui Jong [KHNP, Daejeon (Korea, Republic of)

    2016-05-15

    The effect analysis of electromagnetic pulses (EMPs) has been studied for the past year by the Central Research Institute of Korea Hydro Nuclear Power Co. (KHNP) in order to better establish safety measures in operating nuclear power plants. What is an electromagnetic pulse (EMP)? As a general term for high-power electromagnetic radiation, it refers to strong electromagnetic pulses that destroy only electronic equipment devices in a short period without loss of life. The effect analysis of EMPs in operating NPPs and their corresponding safety measures in terms of selecting target devices against EMP impact have been examined in this paper. In general, domestic nuclear power plants do apply the design of fail-safe concepts. For example, if key instruments of a system fail because of EMPs, the control rods of a nuclear reactor are dropped automatically in order to maintain safe conditions of the NPP. Reactor cooling presents no problem because the diesel generator will adopt the analog starting circuit least affected by the electromagnetic waves.

  17. Development of Highly Survivable Power and Communication System for NPP Instruments under Severe Accident

    International Nuclear Information System (INIS)

    Yoo, Seung J.; Gu, Beom W.; Nguyen, Duy T.; Choi, Bo H.; Rim, Chun T.; Lee, So I.

    2014-01-01

    According to the detail report from the Fukushima nuclear accident, the failure of conventional instruments is mainly due to the following reasons. 1) Insufficient backup battery capacity after the station black out (SBO) 2) The malfunction or damage of instruments due to the extremely harsh ambient condition after the severe accident 3) The cut-off of power and communication cable due to the physical shocks of hydrogen explosion after the severe accident Since the current equipment qualification (EQ) for the NPP instruments is based on the design basis accident such as loss of coolant accident (LOCA), conventional instruments, which are examined under EQ condition, cannot guarantee their normal operation during the severe accident. A 7m-long-distance wireless power transfer and a radio frequency (RF) communication were introduced with conventional wired system to increase a redundancy. A heat isolation box and a harness are adopted to provide a protection from the expected physical shocks such as missiles and drastic increase of ambient temperature and pressure. A detail design principle of the highly survivable power and communication system, which has 4 sub-systems of a DCRS wireless power transfer, a Zigbee wireless communication, a GFRP harness, and a passive type router with a fly back regulator, has been presented in this paper. Each sub-system has been designed to have a robust operation characteristic regardless of the estimated physical shocks after the severe accident

  18. Conference: Nuclear Safety at the Ignalina NPP - Achievements and Challenges

    International Nuclear Information System (INIS)

    1999-01-01

    Brief description of conference which took place in Vilnius on 8-9 April 1999 is presented. The aim of the international conference is to review the work carried out, to evaluate its influence on the nuclear safety, to get acquainted with the safety system of the Ignalina NPP. On December 31, the Ignalina NPP celebrated its 15 year anniversary. During that period the Ignalina NPP has produced more than 182 billion kWh of electricity. Nuclear power is not only immense economic benefit but also a syndrome of fear of an atomic bomb and the Chernobyl accident that has formed over the years. Numerous comprehensive international studies have been performed at the Ignalina NPP. After the Chernobyl accident many steps have been taken to improve the safety of the Ignalina NPP. The introduced changes guaranteed that the void coefficient remained negative in all possible circumstances. The Ignalina NPP is intensively preparing for licensing of unit 1

  19. Development and verification of a leningrad NPP unit 1 living PSA model in the INL SAPHIRE code format for prompt operational safety level monitoring

    International Nuclear Information System (INIS)

    Bronislav, Vinnikov

    2007-01-01

    The first part of the paper presents results of the work, that was carried out in complete conformity with the Technical Assignment, which was developed by the Leningrad Nuclear Power Plant. The initial scientific and technical information, contained into the In-Depth Safety Assessment Reports, was given to the author of the work. This information included graphical Fault Trees of Safety Systems and Auxiliary Technical Systems, Event Trees for the necessary number of Initial Events, and also information about failure probabilities of basic components of the nuclear unit. On the basis of this information and fueling it to the Usa Idaho National Laboratory (INL) SAPHIRE code, we have developed an electronic version of the Data Base for failure probabilities of the components of technical systems. Then, we have developed both the electronic versions of the necessary Fault Trees, and an electronic versions of the necessary Event Trees. And at last, we have carried out the linkage of the Event Trees. This work has resulted in the Living PSA (LPSA - Living Probabilistic Safety Assessment) Model of the Leningrad NPP Unit 1. The LPSA-model is completely adapted to be consistent with the USA INL SAPHIRE Risk Monitor. The second part of the paper results in analysis of fire consequences in various places of Leningrad NPP Unit 1. The computations were carried out with the help of the LPSA-model, developed in SAPHIRE code format. On the basis of the computations the order of priority of implementation of fire prevention measures was established. (author)

  20. Upgrade of Control and Protection System of the Ignalina Nuclear Power Plant Units 1 and 2

    International Nuclear Information System (INIS)

    Wright, Ronald E.; Fletcher, Norman; Sidnev, Victor E.; Bickel, John H.; Vianello, Aldo; Pearsall, Raymond D.

    2003-01-01

    The Ignalina nuclear power plant (NPP) Units 1 and 2 are Soviet-designed, RBMK (Reaktor Bolshoi Moschnosti Kipyashchiy), channelized, large power-type reactors. The original-design electrical capacity for each unit was 1500 MW. Unit 1 began operating in 1983, and Unit 2 was started up in 1987. In 1994, the government of Lithuania agreed to accept grant support for the Ignalina NPP Safety Improvement Program with funding supplied by the Nuclear Safety Account of the European Bank for Reconstruction and Development (EBRD). As conditions for receiving this funding, the Ignalina NPP agreed to prepare a comprehensive safety analysis report that would undergo independent peer review after it was issued. The EBRD Safety Panel oversaw preparation and review of the report. In 1996, the safety analysis report for Unit 1 was completed and delivered to the EBRD. Part of the analyses covered anticipated transients without scram (ATWS). The analysis showed that some ATWS scenarios could lead to unacceptable consequences in <1 min. The EBRD Safety Panel recommended to the government of Lithuania that the Ignalina NPP develop and implement a program of compensatory measures for the control and protection system before the unit would be allowed to return to operation following its 1998 maintenance outage. A compensatory control and protection system that would mitigate the unacceptable consequences was designed, procured, manufactured, tested, and installed. The project was funded by U.S. Department of Energy

  1. Belene NPP

    International Nuclear Information System (INIS)

    Tsvetanov, P.

    1990-01-01

    The book presents the main results of the studies of the Bulgarian Academy of Sciences (BAS) on the construction of a new nuclear power plant at Belene on the Danube river. The programme of the studies comprises five areas: the socio-economic and energy development and the necessity of the commissioning; a technical project and design level of the equipment (safety, radioactivity control, waste disposal and economic efficiency of the power plant); the seismic properties of the construction site; the corresponding risk and design features of the plant; the ecological impacts of the NPP and public opinion. The studies in the different areas have been carried out by independent teams, fully responsible for the formulated topical conclusions. The general opinion of the BAS voiced in the book is that the construction of Belene NPP is not sufficiently substantiated and is considered unacceptable. 94 refs., 53 fig., 56 tabs. (R.Ts.)

  2. Novelly formed products of the interaction of fuel with construction materials of the 4th unit of Chernobyl NPP

    International Nuclear Information System (INIS)

    Borovoj, A.A.; Galkin, B.Ya.; Drapchinskij, L.V.; Krinitsyn, A.P.; Pazukhin, Eh.M.; Petrov, B.F.; Pleskachevskij, L.A.; Checherov, K.P.

    1991-01-01

    Radiation environment and position of fuel-containing masses in the bubbler pond of the 4th unit of the Chernobyl NPP are described. Classification of the products of fuel interaction with structural materials is given. Amounts of fuel on the 1st and 2nd floor of the bubbler pond are estimated. Postaccident pictures of the premises of the bubbler pond are presented for the first time

  3. Integrity Analysis of Turbine Building for the MSLB Using GOTHIC code for Wolsong NPP Unit 2

    International Nuclear Information System (INIS)

    Ko, Bong-Jin; Jin, Dong-Sik; Kim, Jong-Hyun; Han, Sang-Koo; Choi, Hoon; Kho, Dong-Wook

    2015-01-01

    A break in the piping between the steam generators and the turbine can lead to rapid loss of secondary circuit inventory. A break inside the turbine building leads to pressure differentials between different areas of the turbine building. In order to improve the environmental protection of various components within the turbine building, a wall has been erected which effectively separates the area in which these components are housed from the rest of the turbine building. Relief panels installed in the turbine building ensure that the pressure differential across the wall would be less than that required to jeopardize the wall integrity. The turbine building service wing is excluded from the scope of this analysis. It is further assumed that any doors in the heavy wall are as strong as the wall itself, with no gaps or leakage around the doors. For the full scope safety analysis of turbine building for Wolsong NPP unit 2, input decks for the various objectives, which can be read by GOTHIC 7.2a, are developed and tested for the steady state simulation. The input data files provide simplified representations of the geometric layout of the turbine building (volumes, dimensions, flow paths, doors, panels, etc.) and the performance characteristics of the various turbine building subsystems

  4. Integrity Analysis of Turbine Building for the MSLB Using GOTHIC code for Wolsong NPP Unit 2

    Energy Technology Data Exchange (ETDEWEB)

    Ko, Bong-Jin; Jin, Dong-Sik; Kim, Jong-Hyun; Han, Sang-Koo [ACT, Daejeon (Korea, Republic of); Choi, Hoon; Kho, Dong-Wook [KHNP-CRI, Daejeon (Korea, Republic of)

    2015-05-15

    A break in the piping between the steam generators and the turbine can lead to rapid loss of secondary circuit inventory. A break inside the turbine building leads to pressure differentials between different areas of the turbine building. In order to improve the environmental protection of various components within the turbine building, a wall has been erected which effectively separates the area in which these components are housed from the rest of the turbine building. Relief panels installed in the turbine building ensure that the pressure differential across the wall would be less than that required to jeopardize the wall integrity. The turbine building service wing is excluded from the scope of this analysis. It is further assumed that any doors in the heavy wall are as strong as the wall itself, with no gaps or leakage around the doors. For the full scope safety analysis of turbine building for Wolsong NPP unit 2, input decks for the various objectives, which can be read by GOTHIC 7.2a, are developed and tested for the steady state simulation. The input data files provide simplified representations of the geometric layout of the turbine building (volumes, dimensions, flow paths, doors, panels, etc.) and the performance characteristics of the various turbine building subsystems.

  5. An integrated approach for investigation of failed nuclear fuel used at NPP Cernavoda Unit 1

    International Nuclear Information System (INIS)

    Tuturici, I.L.; Parvan, M.; Popov, M.; Dobrin, R.; Staicu, C.

    1996-01-01

    At NPP Cernavoda-Unit 1 the fuel surveillance and the defect detection system in operation are based on monitoring the coolant activity concentration and on measuring the flux of delayed neutrons emitted by some short-lived fission products. In order to identify the failed fuel underwater non-destructive examination has to be performed. The major interest for the availability of underwater examination consists in the necessity of a speedy acquisition of the data on failed fuel in operation and of appropriate follow-up actions to be taken. Often the identification operation will be followed by more detailed examinations on selected fuel rods in the hot cells of the Post-irradiation Examination Laboratory of the Institute for Nuclear Research at Pitesti. Transfer of selected fuel rods will be done by the use of a type B(U) road transportation cask. Such an integrated approach will help to keep the level of activity concentration of the primary circuit well below the authorized limits. (author). 2 figs., 1 tab., 2 refs

  6. Akkuyu NPP – the first Turkish NPP. The new history of the project

    International Nuclear Information System (INIS)

    Tzocheva, V.

    2012-01-01

    An overview is given to the Turkish energy sector and nuclear power plans. The project for the construction of the first NPP in Turkey is presented. The general parameters of the Project are: CAPEX: $ 20 bln; Project design: NPP-2006; (VVER- 1200); Number of units: 4; Total capacity: 4 800 MW; Construction period: 2014 – 2023; PPA period; 15 years, fixed price terms. An account of the activities during 2011, the Worley Parsons participation are presented and a tentative project schedule is given

  7. Experience with high percent step load decrease from full power in NPP Krsko

    International Nuclear Information System (INIS)

    Vukovic, V.

    2000-01-01

    The control system of NPP Kriko, is designed to automatically control the reactor in the power range between 15 and 100 percent of rated power for the following designed transients; - 10 percent step change in load; 5 percent per minute loading and unloading; step full load decrease with the aid of automatically initiated and controlled steam dump. Because station operation below 15 percent of rated power is designed for a period of time during startup or standby conditions, automatic control below 15 percent is not provided. The steam dump accomplishes the following functional tasks: it permits the nuclear plants to accept a sudden 95 percent loss of load without incurring reactor trip; it removes stored energy and residual heat following a reactor trip and brings the plant to equilibrium no-load conditions without actuation of the steam generator safety valves; it permits control of the steam generator pressure at no-load conditions and permits a manually controlled cooldown of the plant. The first two functional tasks are controlled by Tavg. The third is controlled by steam pressure. Interlocks minimise any possibility of an inadvertent actuation of steam dump system. This paper discusses relationships between designed (described) characteristics of plant and the data which are obtained during startup and/or first ten years of operation. (author)

  8. Safety upgrading program in NPP Mochovce

    International Nuclear Information System (INIS)

    Baumeister, P.

    1999-01-01

    EMO interest is to operate only nuclear power plants with high standards of nuclear safety. This aim EMO declare on preparation completion and commissioning of Mochovce Nuclear Power Plant. Wide co-operation of our company with International Atomic Energy Agency and west European Inst.ions and companies has been started with aim to fulfil the nuclear safety requirements for Mochovce NPP. Set of 87 safety measures was implemented at Mochovce Unit 1 and is under construction at Unit 2. Mochovce NPP approach to safety upgrading implementation is showed on chosen measures. This presentation is focused on the issues category III.(author)

  9. An integrated nuclear reactor unit for a floating low capacity nuclear power plant designed for power supply in remote areas with difficult access

    International Nuclear Information System (INIS)

    Achkasov, A.N.; Grechko, G.I.; Gladkov, O.G.; Pavlov, V.L.; Pepa, V.N.; Shishkin, V.A.

    1997-01-01

    The paper describes the conceptual design of an integrated advanced safety nuclear reactor unit for a low capacity floating, NPP designed for power supply in areas which are remote with difficult access. The paper describes the major structural and lay-out components of the steam generator and reactor units with main technical characteristics. (author)

  10. The analysis in real time, during the pre-commissioning period, of the overall plant control system of the CANDU NPP unit

    International Nuclear Information System (INIS)

    Tapu, C.; Irimia, M.

    1994-01-01

    The physical processes in the CANDU NPP are controlled by a computer system which, based on the associated package of programmes, performs both the monitoring function at the level of the operational area, and the digital regulation function of the technological systems within the NPP. For an optimal operation of the NPP, in dynamic as well as in stationary regime, the correlation of the direct digital control of the technological systems is very important for the NPP's overall digital control system. Taking into account the fact that during the pre-commissioning period of a CANDU unit it is necessary to test in dynamic regime the performance of the overall digital control function of the NPP, a system of verification and testing in real time was developed, by connecting a micro simulator of the physical process in the NPP to the actual computer system of the unit. The paper presents the methods and techniques used, as well as the results of the tests for various operational modes, which highlight the functioning of the digital control system of the CANDU NPP unit. (Author)

  11. Accident analysis of Fukushima Daiichi Nuclear Power Station unit 1

    International Nuclear Information System (INIS)

    Kobayashi, Masahide; Narabayashi, Tadashi; Tsuji, Masashi; Chiba, Go; Nagata, Yasunori; Shimoe, Tomohiro

    2015-01-01

    As a result of the Great East Japan Earthquake that occurred on 11 March 2011, all AC and DC power at the Fukushima Daiichi NPP units 1 to 3 were lost soon after the tsunami. The core cooling function was lost, and the cores of units 1 to 3 were damaged. The purpose of this work is to clarify the progress of the accident in unit 1, which was damaged the earliest among the 3 units. Therefore, an original severe accident analysis code was developed, and the progress of the accident was evaluated from the analysis results and the actual data. As a result, the leakage path from a pressure vessel was clarified, and some lessons and knowledge were gained. (author)

  12. Development of a GUI based RETRAN running environment for Kori NPP units 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kyung Doo

    2000-09-01

    RETRAN was developed by EPRI and introduced for domestic use. RETRAN, which is a best-estimate system code approved by USNRC and used by most utilities in US, can be used in various plant support activities such as licensing calculations for plant design changes, EOP validation, and training. RETRAN, however, has been limited to only a few groups of specialists because of the difficulty involved in its usage. The aim of this project is to develop a graphic user interface (GUI) based code running environment for RETRAN named PRE (RETRAN Running Environment) in order to assist ordinary users in their input preparation, code execution, and output interpretation. TRIP and CONTROL BLOCK and VOLUME/JUNCTION input cards from base input are designed to be able to modify the existing input cards and add a new input cards through dialog boxes for users who have not much expertise in use of RETRAN. The RRE is designed to provide the calculated results though on-line X-Y graphs, plant mimics, indicators, nodalization window for easy interpretation of its output. It also provides the replay function using pre-calculated results saved in files. The RRE was developed for Kori NPP units 1 and 2 using Delphi 4.0 and Visual Fortran 6.0 and it runs on personal computers to increase the accessibility. The RRE developed in this study for Kori units 1 and 2 can be used in various plant support activities which require thermal-hydraulic analysis of the NSSS (Nuclear Steam Supply System) such as licensing calculations for plant design change, validation of EOP improvement, and operator training. The RRE developed can be expanded its application to other nuclear plants with low expense.

  13. Development of a GUI based RETRAN running environment for Kori NPP units 1 and 2

    International Nuclear Information System (INIS)

    Kim, Kyung Doo

    2000-09-01

    RETRAN was developed by EPRI and introduced for domestic use. RETRAN, which is a best-estimate system code approved by USNRC and used by most utilities in US, can be used in various plant support activities such as licensing calculations for plant design changes, EOP validation, and training. RETRAN, however, has been limited to only a few groups of specialists because of the difficulty involved in its usage. The aim of this project is to develop a graphic user interface (GUI) based code running environment for RETRAN named PRE (RETRAN Running Environment) in order to assist ordinary users in their input preparation, code execution, and output interpretation. TRIP and CONTROL BLOCK and VOLUME/JUNCTION input cards from base input are designed to be able to modify the existing input cards and add a new input cards through dialog boxes for users who have not much expertise in use of RETRAN. The RRE is designed to provide the calculated results though on-line X-Y graphs, plant mimics, indicators, nodalization window for easy interpretation of its output. It also provides the replay function using pre-calculated results saved in files. The RRE was developed for Kori NPP units 1 and 2 using Delphi 4.0 and Visual Fortran 6.0 and it runs on personal computers to increase the accessibility. The RRE developed in this study for Kori units 1 and 2 can be used in various plant support activities which require thermal-hydraulic analysis of the NSSS (Nuclear Steam Supply System) such as licensing calculations for plant design change, validation of EOP improvement, and operator training. The RRE developed can be expanded its application to other nuclear plants with low expense

  14. Improvement of the reliability of the emergency diesel generators and their protections as a part of the modernization program for units 5 and 6 of the Kozloduy NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2003-01-01

    The measure 'Improvement of the reliability of the emergency diesel generators and their protections' 28411 is part of the modernization program for Units 5 and 6 of Kozloduy NPP. The scope of the measure includes complete change of the I and C system, the local control panels, the technological and electrical protections of the DG set, the excitation system and some of the power distribution switchboards. The new I and C system will be Teleperm XS type, produced by Framatome ANP, the power distribution switchboards type Sivacon, the excitation system Thyripart, and the electrical protection and synchronization system will be provided by Siemens. The purpose of the measure is to increase the availability, maintainability and to improve the reliability of the DG sets

  15. Architecture of nuclear power units

    International Nuclear Information System (INIS)

    Malaniuk, B.

    1981-01-01

    Nuclear units with circulation cooling using cooling towers are dominating points of the landscape. The individual cooling towers or pairs of cooling towers should be situated in the axes of double units and should also linearly be arranged, rhythmically in the respective zone. Examples are shown of the architectural designs of several nuclear power plants in the USA, the UK, the USSR, France, the FRG and Italy. (H.S.)

  16. The management of safety within the completion of units 3. and 4. in NPP Mochovce

    International Nuclear Information System (INIS)

    Ocenas, M.

    2009-01-01

    The contribution defines the way of management of safety and protection of health and protection against the fire during completion of units 3. and 4. in NPP Mochovce. The creation of the management of safety raised from the legal and other requirements applied in the civil activities and mainly from the requirements for coordination of safety on the site. The whole system is methodically managed through the 5 basic documents so-called 'Building rules': 1) Safety-technical conditions of performance in SE, Inc. Bratislava (project MO34); 2) MO34/1/MNA-003.00-02 the elaboration of the integrated safety plan; 3) MO34/1/NA-003.00-03 risks analyse; 4) PNM3460100 Integrated safety plan for completion of Units 3.and 4 in NPP Mochovce; 5) Project of construction organization. The system itself of the management of the safety prevention must by provided by the supplier in compliance with the standard OHSAS 18 001 and ISO 14001, and in compliance with the requirement of the builder applied in the technical specification for the contract. Most of necessary related documentation of Safety plan for the site is usually part of the documentation for quality management of contractor. Therefore it is necessary to put the reference in each chapter of the Safety plan for site and the standpoint how to apply it for the particular specific situation. The coordinator is mandatory to manage the prevention for the part of safety of specified site and to coordinate the activity of suppliers during the works tie in this way, that the each contractor shall meet the safety requirements given by safety plan and also to identify and to eliminate the risks menaced in the particular work places or the suppliers each other. The builder established its own control system and for this purpose he settled the data base so-called 'The system of corrective and precautionary activities'. The system registers in its data base all discrepancies determined during the regular controls of the head workers

  17. Upgrading the SPP-500-1 moisture separators-steam reheaters used in the Leningrad NPP turbine units

    Science.gov (United States)

    Legkostupova, V. V.; Sudakov, A. V.

    2015-03-01

    The specific features of existing designs of moisture separators-steam reheaters (MSRs) and experience gained with using them at nuclear power plants are considered. Main factors causing damage to and failures of MSRs are described: nonuniform distribution of wet steam flow among the separation modules, breakthrough of moisture through the separator (and sometimes also through the steam reheater), which may lead to the occurrence of additional thermal stresses and, hence, to thermal-fatigue damage to or stress corrosion cracking of metal. MSR failure results in a less efficient operation of the turbine unit as a whole and have an adverse effect on the reliability of the low-pressure cylinder's last-stage blades. By the time the design service life of the SPP-500-1 MSRs had been exhausted in power units equipped with RBMK-1000 reactors, the number of damages inflicted to both the separation part and to the pipework and heating surface tubes was so large, that a considerable drop of MSR effectiveness and turbine unit efficiency as a whole occurred. The design of the upgraded separation part used in the SPP-500-1 MSR at the Leningrad NPP is described and its effectiveness is shown, which was confirmed by tests. First, efforts taken to achieve more uniform distribution of moisture content over the perimeter and height of steam space downstream of the separation modules and to bring it to values close to the design ones were met with success. Second, no noticeable effect of the individual specific features of separation modules on the moisture content was revealed. Recommendations on elaborating advanced designs of moisture separators-steam reheaters are given: an MSR arrangement in which the separator is placed under or on the side from the steam reheater; axial admission of wet steam for ensuring its uniform distribution among the separation modules; inlet chambers with an extended preliminary separation system and devices for uniformly distributing steam flows in the

  18. Safety requirement of the nuclear power plants, after TMI-2 accident and their possible implementation on Bushehr NPP

    International Nuclear Information System (INIS)

    Mirhabibi, N.; Tochai, M.T.M.; Ashrafi, A.; Farnoudi, E.

    1985-01-01

    Based on the lessons learned from the TMI-2 accident and other research and developments, many improvements have been required for the design, manufacturing and operation of nuclear power plants in recent years. These requirements have already been implemented to the plants in operation and considered as new safety requirements for new plants. In the present paper these requirements and their possible implementation on Bushehr NPP are discussed. (Author)

  19. Annx IV. Delayed nuclear power plant project management experience Cernavoda 2 NPP, Romania

    International Nuclear Information System (INIS)

    2008-01-01

    The Cernavoda Unit 2 NPP work was originally started in 1982 with work coming to a halt in 1989, and a preservation program implemented in 1991 while work continued on Unit 1. In 1995 attention turned to the completion of Unit 2 and status verification reports were commissioned. Work proceeded, as funds were available, up until 2002 when an interim contract was signed. Subsequently a Contract Completion Effective Date (CCED) was signed in March 2003 with completion duration of 48 months. A project schedule is a necessity for any project whether it is a new build or a restart to a delayed project. There are 5 major elements that are included in all CANDU project schedules, Engineering, Procurement, Construction, Commissioning and the conversion from Construction to Commissioning. The Engineering schedule of deliverables was not fully defined at CCED. Design changes defined prior to CCED were not fully defined and the scope of work associated with these only became known during the actual construction program. A significant number of new design changes were introduced after CCED, which compounded the impact to the construction program. All projects require their budgets to be built up within a defined structure. Delayed projects are no different from other projects in that respect. The standard Work Brakout Structure (WBS), which is applicable to most CANDU projects, is equally applicable for a delayed project. On Cernavoda Unit 2 we used a Budget Breakdown Structure, which was a combination of a traditional WBS and an Organization Structure. This structure was adopted in order to have consistency with the structure, which had been used prior to the delay on the project and also it was a requirement of the three party agreements with funding from different sources and in different currencies. All major construction projects normally carry a contingency allowance for undefined work and a risk allowance for the possibility of major changes. Delayed projects require

  20. NPP Decommissioning: the concept; state of activities

    International Nuclear Information System (INIS)

    Nemytov, S.; Zimin, V.

    2001-01-01

    The main principles of NPP decommissioning concept in Russia are given. The conditions with fulfillment of works on NPP unit pre-decommissioning and decommissioning including: development of the normative documentation, creation of special fund for financing NPP decommissioning activities, deriving the Gosatomnadzor license for decommissioning of shut down NPP units, development of the equipment and technologies for waste and spent fuel management are presented. The decommissioning cost and labour intensity of one WWER-440 unit are shown. The practical works, executed on shut down units at Beloyarsk NPP (Unit1 and 2) and Novo Voronezh NPP (Unit 1 and 2) are outlined

  1. The main conditions ensured problemless implementation of 235U high enriched fuel in Kozloduy NPP (Bulgaria) - WWER-1000 Units

    International Nuclear Information System (INIS)

    Dobrevski, I.; Zaharieva, N.; Minkova, K.; Michaylov, G.; Penev, P.; Gerchev, N.

    2009-01-01

    The collected water chemistry and radiochemistry data during the operation of the Kozloduy NPP Unit 5 for the period 2006-2009 (12-th, 13-th 14-th and 15-th fuel cycles) undoubtedly indicate for WWER-1000 Units (whose specific features are: Steam generators with austenitic stainless steel 08Cr18N10T tubing; Steam generators are with horizontal straight tubing and Fuel elements cladding material is Zr-1%Nb (Zr1Nb) alloy), that one realistic way for problemless implementation of 235 U high enriched fuel have been found. The main feature characteristics of this way are: Implementation of solid neutron burnable absorbers together with the dissolved in coolant neutron absorber - natural boric acid; Application of fuel cladding materials with enough corrosion resistance by the specific fuel cladding environment created by presence of SNB; Keeping of suitable coolant water chemistry which ensures low corrosion rates of core- and out-of-core- materials and limits in core (cladding) depositions and restricts out-of-core radioactivity buildup. The realization of this way in WWER-1000 Units in Kozloduy NPP was practically carried out through: 1) Implementation of Russian fuel assemblies TVSA which have as fuel cladding material E-110 alloy (Zr1Nb) with enough high corrosion resistance by presence of sub-cooled nucleate boiling (SNB) and use burnable absorber (Gd) integrated in the uranium-gadolinium (U-Gd 2 O 3 ) fuel (fuel rod with 5.0% Gd 2 O 3 ); 2) Development and implementation of water chemistry primary circuit guidelines, which require the relation between boric acid concentration and total alkalising agent concentrations to ensure coolant pH 300 = 7.0 - 7.2 values during the whole operation period. The above mentioned conditions by the passing of WWER-1000 Units in NPP Kozloduy to uranium fuel with 4.4% 235 U (TVSA fuel assemblies) practically ensured avoidance of the creation of the necessary conditions for AOA onset. The operational experience (2006-2009) of the

  2. Changing NPP consumption patterns in the Holocene: from Megafauna "liberated" NPP to "ecological bankruptcy"

    Science.gov (United States)

    Doughty, C.

    2015-12-01

    There have been vast changes in how net primary production (NPP) is consumed by humans and animals during the Holocene beginning with a potential increase in availability following the Pleistocene megafauna extinctions. This was followed by the development of agriculture which began to gradually restrict availability of NPP for wild animals. Finally, humans entered the industrial era using non-plant based energies to power societies. Here I ask the following questions about these three energy transitions: 1. How much NPP energy may have become available following the megafauna extinctions? 2. When did humans, through agriculture and domestic animals, consume more NPP than wild mammals in each country? 3. When did humans and wild mammals use more energy than was available in total NPP in each country? To answer this last question I calculate NPP consumed by wild animals, crops, livestock, and energy use (all converted to units of MJ) and compare this with the total potential NPP (also in MJ) for each country. We develop the term "ecological bankruptcy" to refer to the level of consumption where not all energy needs can be met by the country's NPP. Currently, 82 countries and a net population of 5.4 billion are in the state of ecologically bankruptcy, crossing this threshold at various times over the past 40 years. By contrast, only 52 countries with a net population of 1.2 billion remain ecologically solvent. Overall, the Holocene has seen remarkable changes in consumption patterns of NPP, passing through three distinct phases. Humans began in a world where there was 1.6-4.1% unclaimed NPP to consume. From 1700-1850, humans began to consume more than wild animals (globally averaged). At present, >82% of people live in countries where not even all available plant matter could satisfy our energy demands.

  3. Response and capacity evaluation of unit 1-2, Kozloduy NPP

    International Nuclear Information System (INIS)

    Kostov, M.; Stefanov, D.; Boncheva, H.

    1993-01-01

    Investigation described in this presentation was performed within the WANO Program for seismic safety assessment of Kozloduy NPP. The investigation is imposed by the necessity of seismic upgrading of the structures and equipment of the plant for the new design basic earthquake. Term of reference for this study was elaborated by experts of IAEA

  4. The V-1 NPP and V-2 NPP upgrading

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities in the V-1 NPP and V-2 NPP upgrading as well as maintenance carried out by the Nuclear power plants Jaslovske Bohunice in 1997 is presented. The V-1 NPP applied the so called 'Small Backfitting Programme'covering 81 points of the Czechoslovak Atomic energy Commission Decree No 5/91. Continual upgrading continued after the Backfitting Programme completion with the Safety Report and following Nuclear Regulatory Authority of Slovak Republic (NRA SR) Decrees No 1/94 and 110/94 setting spheres and procedure for adopting and implementation of measures enabling the units to operate further on. Results of expert missions, analyses and assessments of components identified by Basic Engineering became the basis for the development of the Gradual Reconstruction Programme. The Programme outputs underwent economic and probabilistic assessing their contribution to nuclear safety. This process resulted in finalizing the Gradual Reconstruction Programme which started to be implemented in 1996 and will be completed in 1999. It is implemented by the REKON consortium and covers 17 areas including Instrumentation and Control, self-consumption emergency supply, leakage monitoring, emergency core cooling system, seismic reinforcement and radioactivity localisation. Both units will reach internationally acceptable safety standards for the remaining life-time period. The V-2 NPP Upgrading and Safety Enhancement Programme includes results of activities performed in the course of last years to define all important activities leading to enhancement of nuclear safety and performance reliability and effectiveness within the plant life-time period and to establish conditions for extending the life-time of these units for 40 years. The V-2 NPP Upgrading and Safety Enhancement Programme aims to assure safe operation with a probability of the core damages less than 10 -4 /reactor · year

  5. Operational behaviour of WWER nuclear power units after Chernobyl accident

    International Nuclear Information System (INIS)

    Milivojevic, S.; Spasojevic, D.

    2000-01-01

    The indicators of effectiveness of WWER operation, in 1987-1998 were analyzed. For three groups of nuclear units (WWER, NPP Kozloduy, NPP Paks), the trends of Indicators flow were established. The comparative analysis of forced outage rate, and load factor of WWERs and nuclear units all in the world was carried out; it gives the general picture of accident influence on the states and the relations of these indicators in considered period (author)

  6. Comparison of the APA-H (Westinghouse) calculations with the operational data for ZpNPP unit 3 cycles 16-19

    International Nuclear Information System (INIS)

    Abdullayev, A. M.; Gorbachenko, O. V.; Ignatchenko, A.I.; Maryokhin, S.V.; Zhukov, A. I.

    2007-01-01

    The computer simulation of ZpNPP Unit 3 (WWER-1000) Cycles 16-19 core depletion has been performed on the basis of the operational data. The changes in reactor heat rate, lead bank position and inlet temperature during the core operation have been taken into account. These calculations were performed by using Westinghouse APA-H (ALPHA/PHOENIX/ ANC-H) code system. The main objectives of the calculations were the comparison with operational data for core loading with TVS-M (Cycle 16) and transition core loading with TVS-A (Cycle 17-19). The calculation results were compared with the results of Critical boric acid concentration vs. Cycle Burnup measurements and Start up Physics Test measurements (at HZP, BOC, NoXe core conditions). Additionally, the comparison between the results of assemblies power calculation performed by ANC-H and BIPR-7A codes is presented (Authors)

  7. Determining the Residual Lifetime of Qualified Electrical and I and C Equipment in Units 5 and 6 of Kozloduy NPP

    International Nuclear Information System (INIS)

    Radoslavov, Biser

    2012-01-01

    The proposed paper clarifies the environmental qualification and residual lifetime of installed equipment and electrical cables in operating WWER 1000 type units 5 and 6 of Kozloduy NPP. The qualification approach is a combination of analyses and tests in consideration of some specific features of WWER equipment. As a result of the study, selected equipment is divided in 26 groups. Qualification groups include similar types of equipment with equal resistance to foreign impacts, analogous critical parts, and same methods of control and estimation of residual lifetime. Qualification protocols were made for each group. (author)

  8. Automatic regulation of the feedwater turbo-pump capacity for the single-turbine 1000 MW NPP unit

    International Nuclear Information System (INIS)

    Pavlysh, O.N.; Garbuzov, I.P.; Reukov, Yu.N.

    1985-01-01

    A schematic of the flow regulators (FR) of feedwater turbo-pumps (FTP) for the single-turbine 1000 MW NPP unit is presented. The FR operate in response to feedwoter signals from FTP or in response to FTP rotor rotational speed and control automatic speed governars. The FR automatic regulation ensures limitation of FTP rotor maximum rotational speed at a feedwater flow rate excess equal to 3600 T/h. The transients in the automatic regulation system are considered. Production tests of FTP FR confirmed the FR operation reliability and the right choice of the regulator concept and structure

  9. The Modernization Program and Power Up-rate at NPP V2 Jaslovske Bohunice, Slovak Republic

    International Nuclear Information System (INIS)

    Reznik, Vladivoj; Krajmer, Imrich

    2010-01-01

    Slovenske Elektrarne, a.s. is a second largest utility company in the Central and Eastern Europe that owns an optimal production portfolio comprised of nuclear, thermal and hydroelectric power plants. There are two nuclear power plants Bohunice and Mochovce both operate with two units and another two units Mochovce 3 and 4 are currently under construction. Electricity at Nuclear power plant Bohunice V2 is generated by two 440 MW units that had gradually been connected to the power network over the period between 1984 and 1985. In the construction of the nuclear power plant V2 the concept of pressurized water reactors was adopted and the Soviet-era design WWER 440 used. The upgrading of Nuclear Power Plant Bohunice V2 is based on three main points: Modernization, Power up-rate, and Ageing monitoring program. The main targets of the modernization project were: Increasing of the Nuclear Safety and of the Nuclear operational reliability, and Seismic improvement. This modernization program is in full compliance with IAEA requirements and with the decisions from the Nuclear Regulatory Agency of the Slovak Republic (UJD) and achievement of the probabilistic safety criteria in accordance with IAEA recommendations. Except that is ensured a safe, reliable, economical and effective electricity and heat generation. Achieved results are based for further prolongation of the operation life time up to 60 years. (authors)

  10. Modernization of electrical systems in NPP Kozloduy unit 5 and 6. Feedback of experience

    International Nuclear Information System (INIS)

    Stinshoff, H.

    2005-01-01

    In the frame of the modernization program for the nuclear power plant Kozloduy unit 5 and 6 Framatome ANP has implemented measures to increase the safety and availability of the electrical systems. The hardware installation is scheduled in the refueling outages of the years 2003 to 2005. In this paper the following items are presented: 1) an overview of the modernization measures; 2) some important technical features of the new equipment and diagnostic measures; 3) feedback of experience

  11. The design preparation for radiation monitoring system in the frame of completion NPP Mochovce Units 3 and 4

    International Nuclear Information System (INIS)

    Sevecka, S.; Slavik, O.; Kapisovsky, V.

    2009-01-01

    In 1985 a Basic Design of Radiation Monitoring System (RMS) has been elaborated for Mochovce NPP unit 3 and 4 construction. Due to construction interruption in the following years this design solution became obsolete. A new solution of RMS have been developed with conception following that of original Basic Design accommodating also safety measures implemented in RMS of NPP EMO units 1 and 2, and based on modem instrumentation and computer technique. Following the updating of Basic Design documentation the preparation of elaboration of RMS detailed design was carried on. In the frame of this preparation a review of possible suppliers of instrumentation satisfying the conception of radiation monitoring system and the extension of required deliveries has been made. Also criteria on RMS suppliers selection have been determined. The types of monitoring systems and equipment, as well as their quantities, have been specified based on updated Basic Design requirements and production profiles and possibilities of potential suppliers. The required parameters of measurements (including measurement geometry) have been evaluated, as well as requirements of legislation and requirements of proposed RMS architecture. (authors)

  12. Construction of large-thickness sand cushions for NPP foundations

    International Nuclear Information System (INIS)

    Krantsfel'd, Ya.L.; Losievskaya, I.K.; Kovalenko, R.P.; Mutalipov, A.

    1982-01-01

    A study is made on some technological peculiarities of preparation of NPP foundations and control methods of foundation density. As an example the experience of cement-sand foundation construction for two 900 MW power-units at the Koeberg South Africa NPP is briefly described. The experience of artificial foundation construction at this NPP indicates both the possibility of obtaining the required quality of cement-sand cushions and commercial construction of large volume of such cushions by acceptable rates and the necessity of unification of work quality characteristics

  13. Assessment of the Internal Pressure Fragility of the Hanul NPP Units 3 and 4 Containment Building Using a Nonlinear Finite Element Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Park, Hyung Kui; Hahm, Dea Gi; Choi, In Kil [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    The sensitivity of the concrete strength is relatively higher compared to that of the steel strength. According to changes in the structure of the material, about 6-10% ultimate internal pressure differences occurred. Thirty sets of an FE model considering the material uncertainty of concrete and steel were composed for the internal pressure fragility assessment. From the internal pressure fragility assessment of the target containment building, the median capacity of liner leakage is estimated to be 116 psi. As can be seen from the Fukushima nuclear power plant accident, the containment building is the final protecting shield to prevent radiation leakage. Thus, a structural soundness evaluation for the containment pressure loads owing to a severe accident is very important. Recently, a probabilistic safety assessment has been commonly used to take into account the possible factors of uncertainty in a structural system. An assessment of the internal pressure fragility of the CANDU type containment buildings considering the correlation of structural material variables, and an assessment of the internal pressure fragility of the CANDU type containment buildings using a nonlinear finite element analysis, were also performed. However, for PWR type containment buildings, a fragility assessment has not been performed yet using a nonlinear finite element model (FEM) analysis. In this study, for the Hanul NPP units 3 and 4 containment building, the internal pressure fragility assessment was established using an FEM analysis. To do this, a three-dimensional finite element model, material property values, and a sensitive analysis were developed. A nonlinear finite element analysis of the Hanul NPP units 3 and 4 containment building was performed for a material sensitivity analysis and internal pressure fragility assessment.

  14. Assessment of the Internal Pressure Fragility of the Hanul NPP Units 3 and 4 Containment Building Using a Nonlinear Finite Element Analysis

    International Nuclear Information System (INIS)

    Park, Hyung Kui; Hahm, Dea Gi; Choi, In Kil

    2013-01-01

    The sensitivity of the concrete strength is relatively higher compared to that of the steel strength. According to changes in the structure of the material, about 6-10% ultimate internal pressure differences occurred. Thirty sets of an FE model considering the material uncertainty of concrete and steel were composed for the internal pressure fragility assessment. From the internal pressure fragility assessment of the target containment building, the median capacity of liner leakage is estimated to be 116 psi. As can be seen from the Fukushima nuclear power plant accident, the containment building is the final protecting shield to prevent radiation leakage. Thus, a structural soundness evaluation for the containment pressure loads owing to a severe accident is very important. Recently, a probabilistic safety assessment has been commonly used to take into account the possible factors of uncertainty in a structural system. An assessment of the internal pressure fragility of the CANDU type containment buildings considering the correlation of structural material variables, and an assessment of the internal pressure fragility of the CANDU type containment buildings using a nonlinear finite element analysis, were also performed. However, for PWR type containment buildings, a fragility assessment has not been performed yet using a nonlinear finite element model (FEM) analysis. In this study, for the Hanul NPP units 3 and 4 containment building, the internal pressure fragility assessment was established using an FEM analysis. To do this, a three-dimensional finite element model, material property values, and a sensitive analysis were developed. A nonlinear finite element analysis of the Hanul NPP units 3 and 4 containment building was performed for a material sensitivity analysis and internal pressure fragility assessment

  15. Methods, means and results from containment leakage decrease in unit 2 at Kozloduy NPP with international participation

    International Nuclear Information System (INIS)

    Demireva, E.; Grigorov, D.; Balabanov, E.

    1995-01-01

    A study of the Kozloduy NPP Unit 2 containment improvement has been carried out. The following objectives are identified: to assess confinement tightness (local tests); to improve tightness; to perform the most urgent repair works; to develop global test procedures including leak tightness at nominal and reduced pressure, structural integrity test and venting flaps reliability test. Nine groups of potential leakage paths have been determined. The ventilation system has been found as the major source of expected leakage having 60 penetrations with size above 250 mm. Proposed modifications of the ventilation system include reduction of the number of inflow and suction valves, replacement of some valves with a better quality ones and installation of isolating valves. It is planned to transfer the experience and results of this study to the other WWER-440 units. 1 ref

  16. Methods, means and results from containment leakage decrease in unit 2 at Kozloduy NPP with international participation

    Energy Technology Data Exchange (ETDEWEB)

    Demireva, E; Grigorov, D; Balabanov, E [Energoproekt, Sofia (Bulgaria)

    1996-12-31

    A study of the Kozloduy NPP Unit 2 containment improvement has been carried out. The following objectives are identified: to assess confinement tightness (local tests); to improve tightness; to perform the most urgent repair works; to develop global test procedures including leak tightness at nominal and reduced pressure, structural integrity test and venting flaps reliability test. Nine groups of potential leakage paths have been determined. The ventilation system has been found as the major source of expected leakage having 60 penetrations with size above 250 mm. Proposed modifications of the ventilation system include reduction of the number of inflow and suction valves, replacement of some valves with a better quality ones and installation of isolating valves. It is planned to transfer the experience and results of this study to the other WWER-440 units. 1 ref.

  17. Three years re-use of low burned fuel assemblies from units 1 and 2 in core loading of units 3 and 4 WWER-440 at Kozloduy NPP

    International Nuclear Information System (INIS)

    Stoyanova, I.; Antov, A.; Spasova, V.

    2006-01-01

    At the end of 2002 Units 1 and 2 of Kozloduy NPP were shutdown before the end of their designed lifetime. This left a large number of assemblies yet with a significant energy resource. In 2003, 43 assemblies from Unit 1 and 55 assemblies from Unit 2 are loaded in the cores of Units 3 and 4 respectively. In 2004, new 49 assemblies from Unit 1 and new 55 assemblies from Unit 2 are loaded in the cores of Units 3 and 4 respectively. In 2005, the next new 25 assemblies from Unit 1 and 66 assemblies from Unit 2 are loaded in the cores of Units 3 and 4 respectively. The realized core loadings of Units 3 and 4 are illustrated. The large number of low burned assemblies after the shut down of Units 1 and 2 and their utilization during 4 consecutive cycles in the cores of Units 3 and 4 both do not permit to obtain in the last 3 cycles the typical mean burn up 35-36 MWd/kg U of 3.6% discharged assemblies

  18. NPP electrical price and tariff in the world

    International Nuclear Information System (INIS)

    Mochamad Nasrullah and Sriyana

    2010-01-01

    Construction of a Nuclear Power Plant (NPP) is always become a controversial issue. Nuclear utility and other party which support the NPP present a calculation of NPP electricity cost too optimistic. However for utility and other party that contra to nuclear present a calculation of NPP electricity cost too pessimistic. This study present to reduce the controversy of nuclear cost. In this study, capital cost (Engineering Procurement Construction, EPC) was taken from Asian, America and Europe, operating and maintenance cost uses experience data of PLN, and nuclear fuel cost uses data year of 2008 with high price, low price and average price scenario. The methodological tools used to compare electricity generation cost was LEGECOST, a program developed by IAEA (International Atomic Energy Agency), while for electricity tariff- price calculation using a program developed by PLN research and development center. With the discount rate 10%, the result shows that the cheapest electricity generation cost of NPP is less than 40 mills/kWh, and average electricity tariff was 55 mills/kWh. In the Europe countries the electricity tariff more expensive than NPP in Asia. However generating cost and electricity tariff of NPP in United Stated of America (USA) less competitive because investment cost more expensive. Generating cost and electricity tariff was different at each country depend on salary, labor wage, materials price, construction specification, regulation related to NPP and environment aspect. (author)

  19. Studying the dynamical characteristics of pumps in NPP unit auxiliary water system under operational conditions

    International Nuclear Information System (INIS)

    Belyaev, S.G.; Puzanov, A.I.; Belikov, V.P.; Dizik, B.S.

    1990-01-01

    Hydrodynamic loads appearing in the flow-through part of pump aggregates of the system of auxiliary water supply in NPP with variations in the operation modes are investigated. It is shown that during operation of centrifugal pumps the position of the mode on the pump characteristic plot must be controlled. When the mode point exceeds the limits of the working zone it results in a considerable increase of dynamic loads: pressure pulsation and vibration. As the flow rate increase the decrease in dynamic loads is recorded at low frequencies of about 2-4 Hz

  20. An approach for Periodic Safety Review (PSR) of units 5 and 6 of Kozloduy NPP

    International Nuclear Information System (INIS)

    Kichev, Emil

    2014-01-01

    Periodic Safety Reviews (PSR) is complementary to the routine and special safety reviews and does not replaced them. It determines the level of compliance with current safety requirements and covers all safety aspects of NPP operation and all equipment (SSCs) on site. Three levels of importance are defined for the documents in PSR (towards higher conservatism): Bulgarian documents; IAEA documents; Documents of manufactures and suppliers of the equipment (SSCs). The scope and activities consists of four stages and includes 14 safety factors (SF). Cooperation with external companies and organizations in areas with proved experience is used.

  1. Main results of the analysis of internal flooding in the reactor building of Kozloduy NPP Unit 6

    International Nuclear Information System (INIS)

    Demireva, E.; Goranov, S.; Horstmann, R.

    2004-01-01

    For modernization of Units 5 and 6 of Kozloduy NPP, a comprehensive analysis of internal flooding scenarios has been carried out for the reactor building outside the containment and for the turbine hall by FRAMATOME ANP and ENPRO Consult. The objective of the presentation is to provide information on the main results obtained in the flooding analysis of the reactor building (outside containment). The flooding analysis is being performed under application of the 'Methodology and boundary conditions'. Flooding calculations are provided for all of the rooms in the reactor building outside the containment in which the fluid systems, having the capacity for flooding, are mounted. The performed functional analysis shows whether the consequences of a postulated initial event are within the NPP design or could lead to situations which are not taken into account in the design. The proposals for overcoming of identified unacceptable situations and the possible strategy of room draining are also given. Several cases of leaks inside the sealed rooms in the restricted area lead to the situation that the rooms will get totally flooded. Even if this should be acceptable from the point of view of loss of system function, the water pressure effect on the structural elements, as walls and doors, does not allow such complete filling-up. The second relevant identified effect was spreading of humidity and high temperatures to adjacent rooms. Long-lasting effects of this type have to be avoided, in order to prevent potential common cause effects on safety system equipment (authors)

  2. Retrofitting of NPP Computer systems

    International Nuclear Information System (INIS)

    Pettersen, G.

    1994-01-01

    Retrofitting of nuclear power plant control rooms is a continuing process for most utilities. This involves introducing and/or extending computer-based solutions for surveillance and control as well as improving the human-computer interface. The paper describes typical requirements when retrofitting NPP process computer systems, and focuses on the activities of Institute for energieteknikk, OECD Halden Reactor project with respect to such retrofitting, using examples from actual delivery projects. In particular, a project carried out for Forsmarksverket in Sweden comprising upgrade of the operator system in the control rooms of units 1 and 2 is described. As many of the problems of retrofitting NPP process computer systems are similar to such work in other kinds of process industries, an example from a non-nuclear application area is also given

  3. Ways of TPP and NPP powerful steam turbine blade erosion decreasing in low flow rate regimes

    International Nuclear Information System (INIS)

    Khrabrov, P.V.; Khaimov, V.A.; Matveenko, V.A.

    1986-01-01

    A systematized approach to the problem of efficient cooling of flow passage and exhaust parts of TPP and NPP steam turbines and prevention of erosion wear of inlet and outlet edges of operating blades is presented. Methods for LP casing cooling and sources of erosion-hazard moisture as well as the main technological and design measures to decrease the erosion of blades are determined

  4. The comparative analysis of safety and economic competitiveness of the advanced high-power reactor projects of NPP

    International Nuclear Information System (INIS)

    Batyrbekov, G.A.; Makhanov, U.M.; Philimonova, R.A.; Kichutkina, E.G.

    2002-01-01

    The comparative analysis results of the safety and economic competitiveness of the seven advanced large sized reactors projects (900 MW and more) are submitted in that report: EPR, Frameatome France, Siemens Germany; EP-1000 Westinghouse, USA and Genesi Italy; Candu 9, Atomic Energy of Canada Ltd; System 80 +, ABB, USA; KNGR, group NSSS Engineering and Development, Korea Power Engineering Company, Inc; APWR, Electric Power company, Japan Atomic Power Company, Mitsubishi Heavy Industries, Westinghouse Electric; and WWER-1000 (V-392), Atomenergoproject/Gidropress Russian Federation. According to the economic competitiveness of listed compared power reactors the 14 criteria of safety have been accepted. These criteria: 1. Features of the barrier system of 'defence-in-depth'. 2. The self-security of a reactor under increase of power and reactivity of a reactor, decrease of the expense and phase transformations of the reactor core coolant (presence of negative feedbacks). 3. Presence of the reactor shutdown systems responding principles of a variety, independence and reservation. Presence of the passive means of initiation and operation of the emergency protection. 4. The emergency cooling of the core of reactor. A presence of the passive means of cooling. Presence of the water reservation for the water supply of the different safety systems. 5. The emergency electrical supply, its reliability and degree of reservation. 6. The prevention measures of the heavy accident with the melt core. The decrease of the heavy accident probability. 7. The account of the heavy accident under development of the levels of protection. 8. The protection levels of NPP, the technological criteria of efficiency of the each safety barriers and the limiting radiation criteria for the each level of protection , in particular for the design-basis and beyond-design-basis accidents. 9. The measures for reduction of the heavy accident consequences. The management by the beyond

  5. Task 24: Dynamic analysis of Kozloduy NPP unit 5 structures: Reactor building

    International Nuclear Information System (INIS)

    Zola, M.

    1999-01-01

    This report refers to the activities of a sub-contract to the Project RER/9/046, awarded to ISMES by the International Atomic Energy Agency (IAEA) of Vienna, to compare the results obtained from the experimental activities performed under previous contract by ISMES with those coming from analytical studies performed in the framework of the Coordinated Research Programme (CRP) on 'Benchmark Study for the Seismic Analysis and Testing of WWER-type Nuclear Power Plants' by other Institutions, relevant to Kozloduy Unit 5 reactor building. After a brief introduction to the problem in Chapter 1, the identification of the comparison positions and reference directions is given in Chapter 3. A very quick description of the performed experimental tests is given in Chapter 4, whereas the characteristics of both experimental and analytical data are presented in Chapter 5. The data processing procedures are reported in Chapter 6 and some simple remarks are given in Chapter 7. (author)

  6. Safety evaluation for communication network software modifications of PCS in Ulchin NPP unit 3

    International Nuclear Information System (INIS)

    Ji, S. H.; Koh, J. S.; Kim, B. R.; Oh, S. H.

    1999-01-01

    On February 2, 1999, an incident occurred at the Ulchin Nuclear Power Plant Unit 3 which resulted in the corruption of data on Perform Net of Plant Control System. This incident was caused by the ASIC (Application Specific Integrated Circuit) chip on the Rehostable Module which is a part of Network Interface Module. Regarding this incident, we required that the utility should propose new algorithms to detect the hardware failure of ASIC chip and evaluated the appropriateness of network software modifications. As a result of this evaluation process, we required that the safety related interlock signals using data communication path be hardwired to make up for the vulnerability of the system architecture. In this paper, we will discuss the system architecture of PCS and fault analysis and evaluation findings

  7. Safety assessment of Olkiluoto NPP units 1 and 2. Decision of the Radiation and Nuclear Safety Authority regarding the periodic safety review of the Olkiluoto NPP

    International Nuclear Information System (INIS)

    2010-02-01

    In this safety assessment the Radiation and Nuclear Safety Authority (STUK) has evaluated the safety of the Olkiluoto Nuclear Power Plant units 1 and 2 in connection with the periodic safety review. This safety assessment provides a summary of the reviews, inspections and continuous oversight carried out by STUK. The issues addressed in the assessment and the related evaluation criteria are set forth in the nuclear energy and radiation safety legislation and the regulations issued thereunder. The provisions of the Nuclear Energy Act concerning the safe use of nuclear energy, security and emergency preparedness arrangements, and waste management are specified in more detail in the Government Decrees and Regulatory Guides issued by STUK. Based on the assessment, STUK consideres that the Olkiluoto Nuclear Power Plant units 1 and 2 meet the set safety requirements for operational nuclear power plants, the emergency preparedness arrangements are sufficient and the necessary control to prevent the proliferation of nuclear weapons has been appropriately arranged. The physical protection of the Olkiluoto nuclear power plant is not yet completely in compliance with the requirements of Government Decree 734/2008, which came into force in December 2008. Further requirements concerning this issue based also on the principle of continuous improvement were included in the decision relating to the periodic safety review. The safety of the Olkiluoto nuclear power plant was assessed in compliance with the Government Decree on the Safety of Nuclear Power Plants (733/2008), which came into force in 2008. The decree notes that existing nuclear power plants need not meet all the requirements set out for new plants. Most of the design bases pertaining to the Olkiluoto 1 and 2 nuclear power plant units were set in the 1970s. Substantial modernisations have been carried out at the Olkiluoto 1 and 2 nuclear power plant units since their commissioning to improve safety. This is in line with

  8. Methodology and boundary conditions applied to the analysis on internal flooding for Kozloduy NPP units 5 and 6

    International Nuclear Information System (INIS)

    Demireva, E.; Goranov, S.; Horstmann, R.

    2004-01-01

    Within the Modernization Program of Units 5 and 6 of Kozloduy NPP a comprehensive analysis of internal flooding has been carried out for the reactor building outside the containment and for the turbine hall by FRAMATOME ANP and ENPRO Consult. The objective of this presentation is to provide information on the applied methodology and boundary conditions. A separate report called 'Methodology and boundary conditions' has been elaborated in order to provide the fundament for the study. The methodology report provides definitions and advice for the following topics: scope of the study; safety objectives; basic assumptions and postulates (plant conditions, grace periods for manual actions, single failure postulate, etc.); sources of flooding (postulated piping leaks and ruptures, malfunctions and personnel error); main activities of the flooding analysis; study conclusions and suggestions of remedial measures. (authors)

  9. Decommissioning cost recovery in the United States: lessons learned from Connecticut Yankee NPP

    International Nuclear Information System (INIS)

    Joosten, J.

    1999-01-01

    The international audience at ICONE-7 is already familiar with the roles of the owner and the NRC in ensuring the technical and safety performance goals of nuclear plant decommissioning. This paper addresses the role of the economic regulator since the pursuit of technical and safety goals must necessarily carry with them -a price tag- and owners must be concerned with the recovery of those costs. Answers to questions about how to pay and who should pay for decommissioning can very often influence nuclear power plant owner's decision-making. In the United States, most nuclear power plants are privately owned. Nevertheless, their owners are not totally free to determine the plant's economics or profitability. Instead, plant owners must sell their electricity to consumers in a regulated market wherein the price of electricity and terms of sale are controlled by the government. Under this regulatory regime, utilities are generally allowed to recover their investment costs -including decommissioning costs- provided that such costs are prudently, incurred. However, when an owner retires the plant prematurely, the prudence of his actions -up to and including the shutdown- are likely to be challenged. In 1997, for example, the owners of the Connecticut Yankee reactor faced a stiff challenge to the recovery of decommissioning costs when they shut down the plant ten years before license expiration. The Connecticut Yankee case thus provides valuable insights into the role of economic regulation on a nuclear plant's decommissioning strategy. (author)

  10. Strain measurement and analysis for the RPV of Qinshan NPP (unit I) at primary system hydrostatic test

    International Nuclear Information System (INIS)

    Qu Jiadi; Wang Peizhu; Xie Shiqiu; Chen Renchang; Sheng Xianke; Dou Yikang; Zhao Weiliang

    1994-01-01

    Hydrostatic test for RPV (Reactor Pressure Vessel) is not only a means to inspect the vessels and the associated systems but also an important way to verify the results of mechanical analysis. The loading obtained by measurement is useful for the establishment of loading spectrum. Some discussions on the shop hydrostatic test planning for the RPV of Qinshan NPP (Nuclear Power Plant) performed in Japan are presented. Comparisons between the results of hydrostatic test provided by vendor and those of primary system hydrostatic test conducted at Qinshan Site are also given. Some data obtained at Qinshan Site such as actual loading and technical data of the stud-bolt, are listed. The results of measurement for the flange rotation, important for the sealing characteristics of RPV, are specifically discussed. The authors point out some of the mistakes in the results of the shop hydrostatic test

  11. Characterisation of radioactive waste at Cernavoda NPP Unit 1 during normal operation

    International Nuclear Information System (INIS)

    Iordache, M.; Bujoreanu, L.; Popescu, I. V.

    2008-01-01

    During the operation of a nuclear plant significant quantities of radioactive waste results that have a very large diversity. At Cernavoda NPP the important waste categories are non-radioactive wastes and radioactive wastes, which are manipulated completely different from which other. For a CANDU type reactor, the production of radioactive wastes is due to contamination with the following types of radioactive substances: - fission products resulting from nuclear fuel burning; - activated products of materials which form part of the technological systems; - activated products of process fluids. Radioactive wastes can be in solid, liquid or gas form. At Cernavoda NPP the solid wastes represent about 70% of the waste volume which is produced during plant operation and as a consequence of maintenance and decontamination activities. The most important types of solid wastes that are obtained and then handled, processed (if required) and temporarily stored are: solid low level radioactive wastes (classified as compact and non-compact), solid medium radioactive wastes, spent resins, used filters and filter cartridges. The liquid radioactive waste class includes organic liquids (used oil, scintillator liquids and used solvents) and aqueous wastes resulting from process system operating, decontamination and maintenance operations. Radioactive gas wastes occur subsequent to the fission process inside the fuel elements as well as due to the process fluids neutron activation in the reactor systems. As result of the plant operation, iodine, noble gases, tritium and radioactive particles occur and are passed to the ventilation stack in a controlled manner so that an exceeding of the maximum permissible concentrations of radioactive material to the environment should not occur. (authors)

  12. Stabilization of gas turbine unit power

    Science.gov (United States)

    Dolotovskii, I.; Larin, E.

    2017-11-01

    We propose a new cycle air preparation unit which helps increasing energy power of gas turbine units (GTU) operating as a part of combined cycle gas turbine (CCGT) units of thermal power stations and energy and water supply systems of industrial enterprises as well as reducing power loss of gas turbine engines of process blowers resulting from variable ambient air temperatures. Installation of GTU power stabilizer at CCGT unit with electric and thermal power of 192 and 163 MW, respectively, has resulted in reduction of produced electrical energy production costs by 2.4% and thermal energy production costs by 1.6% while capital expenditures after installation of this equipment increased insignificantly.

  13. Regulatory approach to NPP ageing in Bulgaria

    International Nuclear Information System (INIS)

    Vassilev, D.

    2000-01-01

    In this contribution summary information of Kozloduy NPP units is presented. The nuclear legislation, regulatory approach for managing safety aspects on NPP ageing, short term programme, complex programme PRG'97 ant other aspects of ageing management are discussed

  14. Environmental impact assessments of a fifth nuclear power plant unit in Finland

    International Nuclear Information System (INIS)

    Aurela, Jorma; Koivisto, Katarina

    2000-01-01

    This paper presents the results of president questionnaires and media monitoring of press cuttings concerned with siting of the new fifth in a row Finnish NPP. Two years ago both Fortum Power and Heat Oy and Teollisuuden Voima Oy (TVO) launched their Environmental impact assessment (EIA) procedures of a new nuclear power unit in Finland. The EIA procedures were launched to investigate the environmental impacts of a fifth nuclear power plant which possibly will be built in Loviisa or at Olkiluoto. In Finland there are four operating NPP units, two in Loviisa (Fortum) and two in Eurajoki, Olkiluoto (TVO). In the EIA procedure citizens and various associations and authorities have an opportunity to express their views on the matters related to the project. The Ministry of Trade and Industry (MTI) as the coordination authority arranges the organisation of the EIA hearings and the collection of statements and opinions. The EIA procedure in Finland takes place in two stages. The first stage i.e. the EIA programme describes the project and presents the plan on how the environmental effects are investigated and assessed. In the second stage the actual assessment of the environmental effects of the project will be submitted. Both Fortum and Teollisuuden Voima Oy (TVO) launched in spring 1998 their EIA procedures. The main alternatives are the Loviisa 3 project includes two plant type alternatives. The size of the plant is between 1000 and 1700 MWe, and the extension project of the Olkiluoto NPP to build a NPP unit of about 1000-1500 MWe at Olkiluoto. The EIA reports were submitted to the MTI in August 1999 and after that they were on display for two months for opinions and statements

  15. Russian normative approach to the question of management of NPP life time

    International Nuclear Information System (INIS)

    Karpunin, N.I.

    2002-01-01

    Full text: In Russia, the designated service life of a nuclear power plant (NPP) is 30 years. During the period 2001-2010, 15 Russian NPP units will reach the end of their service life. The 'Basic Provisions of NPP Safety Assurance', OPB-88/97, Item 5.1.14, provide for a possible extension of NPP operation beyond the designated service life. For such an extension, the NPP operating organization must apply for a license renewal to Gosatomnadzor, which needs to specify the relevant requirements. GAN is developing regulatory documents to provide a basis for NPP license renewal/extension of NPP operation, which would benefit from international experience. In accordance with 'The program of Atomic Energy Development in the Russian Federation for 1998-2005 and up to 2010' adopted by Decree No. 815 of the Government of the Russian Federation on 21 July 1998, priority is placed on the preparation of NPPs for extension of service life and on ensuring safety in the extended operating period. The length of the extension beyond the designated service life is to be determined on the basis of a range of technical and economic considerations, including: The ability to ensure and maintain operational safety; Sufficient residual service life of the unit's non-repairable components; The availability of temporary storage facilities for the additional spent nuclear fuel and radioactive waste, or the possibility of its transport off-site; The ability to ensure safe handling of the radioactive waste generated during the extension period; To extend the lifetime of an NPP unit, the plant Operator is required to perform the following tasks: Carry out a comprehensive survey of the NPP unit; Draw up a programme of preparation for lifetime extension; Prepare the NPP unit for operation in the extended period; Carry out the necessary tests. There are also some normative documents, which regulate management of NPP life time. (author)

  16. Westinghouse experience in Kozloduy NPP units 5 and 6 I and C modernization

    International Nuclear Information System (INIS)

    Sechensky, B.

    2005-01-01

    The paper presents the background, current implementation approach and experience on the largest ever modernization program on operating units WWER 1000 (PWR) at Kozloduy Nuclear Power Plant in Bulgaria. The Modernization Program itself includes more than 212 measures. Westinghouse is modernizing the major I and C systems at WWER 1000. The major topics of the modernization program and specific approach described in this paper are as follows: 1) Design Approach and Feature; 2) Installation Approach; 3) Test Strategy; 4) Licensing Strategy, applicable codes and standards. At the end author summarized that: 1) Specific design solutions were required and developed in order to address the specific plant features. At each stage, representatives of the Client are being involved in the process of designing and testing of the equipment and systems; 2) Phase-by-phase installation efforts were developed and extensive installation design documentation was prepared to fit in the limited outage window and to successfully complete the installation activities; 3) Well-prepared, multi-phase testing strategy was developed and is being implemented to assure the proper and adequate operation of the equipment at the factory and at the real plant

  17. Development of performance analysis support modules in Younggwang NPP unit 3 and 4

    International Nuclear Information System (INIS)

    Heo, G. Y.; Lee, S. J.; Jang, S. H.; Choi, S. S.; Choi, Q. H.; Gee, M. H.; Heo, I.

    2003-01-01

    This paper covers the unmeasured parameter estimation module, the performance degradation estimation module, and the performance degradation diagnosis module that are the supporting modules of the thermal performance analysis program of Younggwang nuclear power plant unit 3 and 4, PERUPS (PERformance UPgrade System), which was developed by KHNP, KEPRI, Hoseo university, and ACT. The unmeasured parameter estimation module plays a role in the generation of estimated values for the parameters that are necessary but there are no sensors. The performance degradation estimation module shows the impact for electric gain and loss according to the parameters related to turbine cycle performance. The performance degradation diagnosis module provides the belief according degradation causes considering the measurement uncertainty, analysis uncertainty, and correlation among parameters. Reference data for the development of each module was prepared by a turbine cycle simulation tool, PEPSE. The unmeasured parameter estimation module and the performance degradation estimation module make the estimation correlations by the regression analysis using the reference data. In the performance degradation diagnosis module, Bayesian network is used for the modeling of uncertainty and knowledge-base. The validation of the developed modules was performed by the test data generated by PEPSE, and accomplished by the actual data again

  18. Assessment of the Zaporizhya NPP unit 1 reactor pressure vessel safety

    International Nuclear Information System (INIS)

    Podkopaev, V.; Popov, V.; Zaritsky, N.

    1997-01-01

    This emergency situation had occurred at the ZNPP unit 1 while its being under ''hot shutdown'' in natural coolant circulation mode. The main difference between emergency situation and mode with improper setting of PPPD described in the ''Technical Safety Substantiation (TSS) is that this mode is being considered in the TSS under rated power of reactor with main circulation pumps (MCP) under operation. This difference is a substantial one. For this reason a necessity appeared to asses an integrity of referred reactor pressure vessel (RPV) under given emergency situation to judge whether results obtained meet the ND requirements (safety assessment). Under operation such RPV elements are being mostly affected as upper cooling, lower cowling, weld No. 3 weld No. 4 situated in front of core. These elements materials ageing process is the most intense one. Thus, this work was aimed at investigation of structure material behavior and RPV integrity assessment under thermal shock conditions while PPPD improper setting. At that time the most attention was drawn to above mentioned upper and lower cowlings along with welds No. 3 and 4. 5 refs, figs, 10 tabs

  19. Assessment of the Zaporizhya NPP unit 1 reactor pressure vessel safety

    Energy Technology Data Exchange (ETDEWEB)

    Podkopaev, V; Popov, V; Zaritsky, N [State Scientific and Technical Centre on Nuclear and Radiation Safety (SSTC NRS), Kiev (Ukraine)

    1997-09-01

    This emergency situation had occurred at the ZNPP unit 1 while its being under ``hot shutdown`` in natural coolant circulation mode. The main difference between emergency situation and mode with improper setting of PPPD described in the ``Technical Safety Substantiation (TSS) is that this mode is being considered in the TSS under rated power of reactor with main circulation pumps (MCP) under operation. This difference is a substantial one. For this reason a necessity appeared to asses an integrity of referred reactor pressure vessel (RPV) under given emergency situation to judge whether results obtained meet the ND requirements (safety assessment). Under operation such RPV elements are being mostly affected as upper cooling, lower cowling, weld No. 3 weld No. 4 situated in front of core. These elements materials ageing process is the most intense one. Thus, this work was aimed at investigation of structure material behavior and RPV integrity assessment under thermal shock conditions while PPPD improper setting. At that time the most attention was drawn to above mentioned upper and lower cowlings along with welds No. 3 and 4. 5 refs, figs, 10 tabs.

  20. Method for heating of the primary circuit of WWER electric power units at cold start-up

    International Nuclear Information System (INIS)

    Ivanov, I.N.; Dimitrov, B.D.; Korkinova, M.I.

    1982-01-01

    The method increases the heating rate and shorten the start-up time of the electric power units. It comprises a primary stopping of the reactor core heating and provides a forced circulation of the heat-carrier through the circulation cycles of the primary circuit. The thermal energy is supplied in one or several steam generators in the secondary circuit of an NPP operating unit. 1 cl., 3 figs

  1. Estimation of the influence of the early termination of the operation of units 1- 4 in NPP Kozloduy on the greenhouse gas emissions and the obligations of Republic of Bulgaria regarding the Kyoto Protocol

    International Nuclear Information System (INIS)

    Christov, Chr.; Vasilev, Hr.

    2003-01-01

    The case of early termination of the operation of units 1 - 4 in NPP 'Kozloduy' would have a considerable impact on the greenhouse gas (GHG) emissions because in the structure of the electricity production the nuclear power plant occupies over 40%. Due to decrease of the share of the nuclear energy in the electricity production the share of the solid and gaseous fuels increases. They are a considerable source of GHG. Three scenarios for the development of the electric power sector until year 2015 have been studied for the case of early termination of the operation of units 1 - 4 in NPP: Scenario 1: Early termination of the operation of units 1 - 4 according to terms pointed out by the EU. Scenario 2: Decommissioning of units 1 - 4 according to term in the project design. Scenario 3: Early termination of the operation of units 1 - 2 according to terms pointed out by the EU and decommissioning of units 3 - 4 according to terms in the project design. Comparative calculations have been performed for the forecasted GHG emission quantities in the first commitment period of the Kyoto Protocol (2008 - 2012). The potential for possible quantities of GHG emissions that could be traded during the entire five-year period are estimated. At minimum possible price of the emissions 5 $US/tCO 2 the annual income will be at least 100 - 130 mill $US. The realistic estimation regarding the omitted benefits due to early termination of the operation of units 1 - 4 is about 900 mill $US for the five year period of Kyoto. The continued operation of units 3 - 4 to the end of the term defined in the project design could make it possible to fulfill an income of 700 mill to 1 billion $US from emission trading

  2. Mochovce power plant units 3 and 4

    International Nuclear Information System (INIS)

    Cuba, J.

    2003-01-01

    The report gives the basic technical data and history of the construction of the units 3 and 4 of the Mochovce NPP.The current status of the units completion according to the original plan is: civil part - 70%; mechanical part - 30%; electric and IC equipment - 1%. Strategic plan for the preservation of the units 3 and 4 has been developed in accordance with TECDOC-1110. In implementation of the plan preservation activities are performed for the components located and built-in on the site and in storehouses. Preservation with dryers and protective coatings is applied. The factors of possible component degradation are determined. Ventilation components are used for improving the climate conditions in the primary part of the reactor building. Temperature and humidity measurements are done and temperature control is set. Special pre-service inspections beyond the basic scope of preservation and protection works are conducted of steam generator and reactor pressure vessel. The implementation of the design data protection and enhancement is discussed. The feasibility study of units 3 and 4 completion funding has been developed in 2002

  3. Thermohydraulic investigations of nuclear power facilities (to the 60-th anniversary of the First NPP start)

    International Nuclear Information System (INIS)

    Rachkov, V.I.; Efanov, A.D.; Zhukov, A.V.; Kalyakin, S.G.; Sorokin, A.P.

    2014-01-01

    The investigations conducting in SSC RF - IPPE are aimed to develop theory and create calculational programs which allow to obtain the detailed description of coolant velocity fields and temperatures in any channels and equipment units of nuclear power facilities. Specially developed sensors for measuring various parameters are used in the experiments. Mathematical models and numerical methods are generalized for description and numerical solution of compressible fluids, multiphase and multifluid systems. The programs which allow to determine hydrodynamic and thermotechnical characteristics with account for melting, solidification, boiling processes are established. The obtained data is the base for creating the two-phase media flow theory. The study of the processes of impurity formation, transport and precipitation in liquid metal coolants has been allowed to develop the methods of impurity mass transfer simulation in circuits. For solving the fast reactor safety problem the series of investigations on liquid metals physics, boiling and condensation have been carried out [ru

  4. Experiences in the implementation of the Coaching project in the nuclear power plant of Laguna Verde (NPP-L V)

    International Nuclear Information System (INIS)

    Mendez M, H. I.

    2012-10-01

    This document has the purpose of to share acquired experiences during the implementation of the Coaching project focused the training of supervisors and directive personnel of the nuclear power plant of Laguna Verde (NPP-L V). Derived of the improvement areas identified by the supervisor organization of the nuclear power stations WANO (World Association Nuclear of Operators) and of the auto-evaluations realized by the expert personnel of the same power station that based on external experiences carried out through the Benchmarking (comparison with other power stations) they have reflected the necessity to activate a training process in Coaching with a practical focus toward the directive and supervisor personnel in the power station. By means of the observation of the personnel's acting so much in the control rooms like in different areas, three focus areas have been identified for the training in Coaching, these are the personnel's motivation, the organizational communication so much in vertical form as horizontal and the perception of confidence lack among directive, supervisors, operators and technicians. The plan focused in the abilities training of Coaching with practical sense was development, supported with an evaluation of 360 grades as tool of competitions development through a computer application e-Coaching. The use of application and Coaching following techniques facilitated the conformation of the practical focus, same that are of continuous use starting from the training of the supervisor and directive personnel. (Author)

  5. Licensing of the Ignalina NPP

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Since 1991 State Nuclear Power Safety Inspectorate (VATESI) has regulated Ignalina NPP operation by issuing annual operating permits. Those have been issued following submission of specified documents by the Ignalina NPP that have been reviewed by VATESI. However, according to to the procedures that are now established in the Law on Nuclear Energy and subordinate regulations the use of nuclear energy in the Republic of Lithuania is subject to strict licensing. Therefore a decision about the licence for continued operation of unit 1 should be taken. Licence would be granted by VATESI in cooperation with the Ministry of Health, Ministry of Environment and the institutions of local authorities. Ignalina NPP presented to the VATESI safety analysis report (SAR) with other documents. SAR was made mainly by foreign experts and financed by European Bank for Reconstruction and Development (EBRD). VATESI in this process is supported by western regulators. A special project LAP - Licensing Assistance Project was launched to help VATESI perform licensing according western practices

  6. Overview of Cernavoda NPP training programme

    International Nuclear Information System (INIS)

    Valache, Cornelia

    2005-01-01

    Full text: The paper presents a general assessment of Cernavoda NPP personnel training programme, highlighting the role of training in human performance improvement. Cernavoda NPP Personnel Training and Authorization Department (PTAD) is the one responsible for the training of Unit 1 and 2 staff. PTAD is structured in such a manner as to support and respond to all Cernavoda NPP training, qualification and authorization requirements. The training of personnel is continuously adapted based on IAEA Guides and INPO/WANO recommendations, to keep with world standards, based on the internal and external reviews. At Cernavoda NPP the Training Concept and the Training Programmes are based on SAT - Systematic Approach to Training. The Training Concept is established on a set of training documents (RD's, SI's, IDP's), which address all the SAT phases: Analysis, Design, Development, Implementation and Evaluation. The Training Programmes are structured on the initial and continuing personnel training. Their content and goals respond to the training specific needs for each plant major job family. In order to successfully support NPP training programmes, CNPP training center has upgraded classrooms with new presentation facilities and there are plans to expand the space of the building, to develop additional operator and maintenance skills facilities. There are also a number of general areas for improvement of PTAD activity, such as operators and maintenance training, initial and continuing training of both Unit 1 and 2 staff. By responding in a timely and completely manner to all plant training requirements PTAD will help in rising human performance of Cernavoda NPP personnel, supporting the safe, efficient and cost effective production of power. (author)

  7. Real-time management (RTM) by cloud computing system dynamics (CCSD) for risk analysis of Fukushima nuclear power plant (NPP) accident

    International Nuclear Information System (INIS)

    Cho, Hyo Sung; Woo, Tae Ho; The Cyber Univ. of Korea, Seoul

    2017-01-01

    The earthquake and tsunami induced accident of nuclear power plant (NPP) in Fukushima disaster is investigated by the real-time management (RTM) method. This non-linear logic of the safety management is applied to enhance the methodological confidence in the NPP reliability. The case study of the earthquake is modeled for the fast reaction characteristics of the RTM. The system dynamics (SD) modeling simulations and cloud computing are applied for the RTM method where the real time simulation has the fast and effective communication for the accident remediation and prevention. Current tablet computing system can improve the safety standard of the NPP. Finally, the procedure of the cloud computing system dynamics (CCSD) modeling is constructed.

  8. Real-time management (RTM) by cloud computing system dynamics (CCSD) for risk analysis of Fukushima nuclear power plant (NPP) accident

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Hyo Sung [Yonsei Univ., Wonju Gangwon-do (Korea, Republic of). Dept. of Radiation Convergence Engineering; Woo, Tae Ho [Yonsei Univ., Wonju Gangwon-do (Korea, Republic of). Dept. of Radiation Convergence Engineering; The Cyber Univ. of Korea, Seoul (Korea, Republic of). Dept. of Mechanical and Control Engineering

    2017-03-15

    The earthquake and tsunami induced accident of nuclear power plant (NPP) in Fukushima disaster is investigated by the real-time management (RTM) method. This non-linear logic of the safety management is applied to enhance the methodological confidence in the NPP reliability. The case study of the earthquake is modeled for the fast reaction characteristics of the RTM. The system dynamics (SD) modeling simulations and cloud computing are applied for the RTM method where the real time simulation has the fast and effective communication for the accident remediation and prevention. Current tablet computing system can improve the safety standard of the NPP. Finally, the procedure of the cloud computing system dynamics (CCSD) modeling is constructed.

  9. Nuclear Power Plant Control and Instrumentation activities in the United Kingdom

    International Nuclear Information System (INIS)

    Goodings, A.

    1990-01-01

    The paper describes the status of the NPP control and instrumentation in the United Kingdom. The general technology underlying most aspects of power reactor C and I in the UK has not altered since the last progress report although there have been many improvements in detail. In one field, however, that of computer applications, the change has almost been one of kind rather than degree. The following fields are briefly described: The status of nuclear power in the UK, the development of sensors, the development of electronic equipment, signal processing - information technology, quality assurance and the validation and verification of software, expert systems, training simulators. (author). 1 ref

  10. Preparation for Ignalina NPP decommissioning

    International Nuclear Information System (INIS)

    Medeliene, D.

    2004-01-01

    Latest developments of atomic energy in Lithuania, works done to prepare Ignalina NPP for final shutdown and decommissioning are described. Information on decommissioning program for Ignalina NPP unit 1, decommissioning method, stages and funding is presented. Other topics: radiation protection, radioactive waste management and disposal. Key facts related to nuclear energy in Lithuania are listed

  11. Portable Power And Digital-Communication Units

    Science.gov (United States)

    Levin, Richard R.; Henry, Paul K.; Rosenberg, Leigh S.

    1992-01-01

    Conceptual network of electronic-equipment modules provides electrical power and digital radio communications at multiple sites not served by cables. System includes central communication unit and portable units powered by solar photovoltaic arrays. Useful to serve equipment that must be set up quickly at remote sites or buildings that cannot be modified to provide cable connections.

  12. Implementation of the KASKAD computer code system for WWER-440 at Kozloduy NPP

    International Nuclear Information System (INIS)

    Antonov, A.; Georgieva, N.; Spasova, V.

    2003-01-01

    Since 2002 at Kozloduy NPP - EP1 the code package KASKAD is used for WWER-440 reactor core calculations. The main codes entering this package are: BIPR-7A: 3-D diffusion and core analysis code; PERMAK-A: 2-D fine mesh diffusion code. The burnup calculations were performed for all cycles of the Kozloduy NPP Unit 1, Unit 2, Unit 3 and Unit 4. For the last 4-5 cycles of the Units were calculated control rods worth, critical boron concentration at zero power, reactivity coefficients and linear power. These results were analysed and were compared with experimental data. Some results were given in this paper

  13. Radioactive contamination of the Belarus' territory causing to destruction of the building constructions of the 4th unit of the Chernobyl NPP

    International Nuclear Information System (INIS)

    Beskorovajnyj, V.P.; Kotovich, V.V.; Molodykh, V.G.; Skurat, V.V.; Stankevich, L.A.; Sharovarov, G.A.

    1995-01-01

    The adverse scripts of development of events, causing to destruction of object 'UKRYTIE' and to contamination of the territory of Republic of Belarus are considered. The number of designs of the 4th unit has visually observed damages. Also there are hypothetically unstable constructive elements, at installation of which in a conditions of 1986 the application of reliable welded or bolt connections was impossibly. Initial events of the considered hypothetical accident are earthquake or aircraft accident. Settlement data on contamination of territory for considered accident are indicated. The account was made for a moderate- stable condition of atmosphere by the Gauss model for process of the dust particles precipitation. In this case the radionuclide falling out will take place basically on already contaminated territory of Belarus. The additional contamination may be about 2 Ci/sq.km in the Mozyr' region and 20 Ci/sq.km in Chernobyl NPP territory. In case of imposing of acts of nature (the earthquake or tornado), the all dust fraction, which available in object, may be released in atmosphere. The total activity of the dust falling out will be about 1.3 MCi, that can lead to more powerful contaminated of the south part of Belarus. Despite the hypothetical character of the scripts, the probability of their realisation at long operation of object will increase. Thus, the transformation of object 'UKRYTIE' to a safe system is an urgent problem. 1 ref., 3 figs

  14. BN-1200 Reactor Power Unit Design Development

    International Nuclear Information System (INIS)

    Vasilyev, B.A.; Shepelev, S.F.; Ashirmetov, M.R.; Poplavsky, V.M.

    2013-01-01

    Main goals of BN-1200 design: • Develop a reliable new generation reactor plant for the commercial power unit with fast reactor to implement the first-priority objectives in changing over to closed nuclear fuel cycle; • Improve technical and economic indices of BN reactor power unit to the level of those of Russian VVER of equal power; • Enhance the safety up to the level of the requirements for the 4th generation RP

  15. Results and development prospects for the Cernavoda NPP

    International Nuclear Information System (INIS)

    Rotaru, Ioan

    2001-01-01

    The new competitive market in the power sector offers favorable conditions for continual developing of Nuclear Power in Romania. The principal arguments in this respect are: the CANDU technology is a western technology recognized world wide both for its operation reliability and its economical performances. The results obtained by Cernavoda NPP Unit 1 over a period of four years and a half commercial operation confirms the validity of the CANDU project in Romania in the new conditions of competitive market. Accomplishing the Unit 2 of Cernavoda NPP represents for the time being one of the most cost-effective investment in the Romanian power sector. Also, the participation of the local industry to the project implementation is important as it ensures the initial heavy water and nuclear fuel charging, specific materials and equipment production, design and construction works, etc. Heaving in view all these favorable arguments, the construction of Unit 2 of Cernavoda NPP represents one of the highest priorities of the State Budget of the present administration in year 2001. The Nuclear Power Project in Romania, based on CANDU technology meets national as well as EU regulations concerning nuclear power and as such its development poses no significant problems both in the context of EU extension and in the frame of the developing competitive market in the power sector. For SNN SA the main objectives in view for the next stage are: operating Cernavoda NPP Unit 1 in conditions of highest nuclear safety and economical efficiency; finalizing the Cernavoda NPP Unit 2 and creation of an organisation for operating the two units; promoting of a functional system characteristic to the competitive market economy and open to privatization; creating opportunities for exporting electrical energy. The contribution contains the following sections: 1. General overlook; 2. Performance of the power production in the year 2000; 2.1. Unit 1 of Cernavoda NPP; 2.2. Nuclear Fuel Plant

  16. Safety assessment of multi-unit NPP sites subject to external events

    International Nuclear Information System (INIS)

    Samaddar, Sujit; Hibino, Kenta; Coman, Ovidiu

    2014-01-01

    This paper presents a framework for conducting a probabilistic safety assessment of multi-unit sites against external events. The treatment of multiple hazard on a unit, interaction between units, implementation of severe accident measures, human reliability, environmental conditions, metric of risk for both reactor and non-reactor sources, integration of risk and responses and many such important factors need to be addressed within the context of this framework. The framework facilitates the establishment of a comprehensive methodology that can be applied internationally to the peer review of safety assessment of multi-unit sites under the impact of multiple external hazards. In summary, it can be said that the site safety assessment for a multi-unit site will be quite complex and need to start with individual unit risk assessments, these need to be combined considering the interactions between units and their responses, and the fragilities of the installations established considering the combined demands from all interactions. Using newly established risk metric the risk can then be integrated for the overall site. Fig. 2 shows schematically such a proposal. Much work has to done and the IAEA has established a working group that is systematically establishing the structure and process to incorporate the many issues that are a part of a multi-unit site safety assessment. (authors)

  17. Influence of the CVCS Modelling on Results of the Loss of Offsite Power (LOOP) Safety Analysis for NPP Krsko

    International Nuclear Information System (INIS)

    Bencik, V.; Bajs, T.; Debrecin, N.

    2006-01-01

    A Loss of Offsite Power (LOOP) transient scenario is based on a complete loss of non-emergency AC power that results in the loss of all power to the plant auxiliaries, i.e., the Reactor Coolant Pumps (RCPs), condensate pumps, etc. An actual LOOP event would cause a loss of all feedwater, a loss of forced Reactor Coolant System (RCS) flow and a reactor trip within less than 2 seconds as a result of either loss of power to the rod cluster assembly gripper coils or any RCS flow trips. For safety analysis purposes the LOOP event is conservatively modelled as a Loss of Normal Feedwater (LONF) transient with a subsequent loss of offsite power as a result of a reactor trip. The reactor trip followed by RCP trip are delayed until a low-low Steam Generator (SG) level signal is reached. This is a more conservative scenario than the LOOP event because the least amount of SG secondary side water mass available for heat removal and the increased amount of the stored energy in the primary circuit at the time of the loss of RCS flow result. The standard LOOP safety analysis is aimed to demonstrate the natural circulation capability of the RCS to remove residual and decay heat from the core aided by Auxiliary Feedwater in the secondary system. In addition to this goal the presented work is aimed to resolve the potential safety issue resulting from the influence of the Chemical and Volume Control System (CVCS) operation during LOOP event for NPP Krsko. The potential safety concern for the LOOP analysis is that the loss of instrument air system may occur thus leading to the CVCS charging and letdown flow imbalance. A net RCS inventory addition may result with water solid pressurizer condition. Water discharge through the pressurizer relief and safety valves could lead to overpressurization of the Pressurizer Relief Tank (PRT) and rupture of the PRT rupture disks. Additional concern is that pressurizer relief and safety valves may fail to properly reseat when exposed to water relief

  18. From Market Uncertainty to Policy Uncertainty for Investment in Power Generation: Real Options for NPP on Electricity Market

    International Nuclear Information System (INIS)

    Tomsic, Zeljko

    2014-01-01

    In the electricity sector, market participants must make decisions about capacity choice in a situation of radical uncertainty about future market conditions. Sector is normally characterised by non-storability and periodic and stochastic demand fluctuations. In these cases capacity determination is a decision for the long term, whereas production is adjusted in the short run. Capacities need to be installed well in advance (decision for investment even earlier because of long construction time and even longer in case of NPP to prepare all needed legal, financial and physical infrastructure), at times when firms face considerable demand and cost uncertainty when choosing their capacity. Paper looks on the main contributions in investment planning under uncertainty, in particular in the electricity market for capital intensive investments like NPP. The relationship between market and non-market factors (recent UK policy example) in determining investment signals in competitive electricity markets was analysed. Paper analyse the ability of competitive electricity markets to deliver the desired quantity and type of generation capacity and also investigates the variety of market imperfections operating in electricity generation and their impact on long-term dynamics for generation capacity, the most capital-intensive of the liberalised functions in the electricity supply industry. Paper analyses how price formation influences investment signals. Today, investment decisions are made by several operators that act independently. Number of factors (including market power, wholesale price volatility, lack of liquidity in the wholesale and financial market, policy and regulatory risks etc.) contribute to polluting the price signal and generating sub-optimal behaviour. Climate change policies can easily distort market signals, insulating renewables generation from market dynamics. This in turn reduces the proportion of the market that is effectively opened to competitive

  19. A study on the optimal replacement periods of digital control computer's components of Wolsung nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Mok, Jin Il; Seong, Poong Hyun

    1993-01-01

    Due to the failure of the instrument and control devices of nuclear power plants caused by aging, nuclear power plants occasionally trip. Even a trip of a single nuclear power plant (NPP) causes an extravagant economical loss and deteriorates public acceptance of nuclear power plants. Therefore, the replacement of the instrument and control devices with proper consideration of the aging effect is necessary in order to prevent the inadvertent trip. In this paper we investigated the optimal replacement periods of the control computer's components of Wolsung nuclear power plant Unit 1. We first derived mathematical models of optimal replacement periods to the digital control computer's components of Wolsung NPP Unit 1 and calculated the optimal replacement periods analytically. We compared the periods with the replacement periods currently used at Wolsung NPP Unit 1. The periods used at Wolsung is not based on mathematical analysis, but on empirical knowledge. As a consequence, the optimal replacement periods analytically obtained and those used in the field show a little difference. (Author)

  20. BN-600 power unit 15-year operating experience

    International Nuclear Information System (INIS)

    Saraev, O.M.; Oshkanov, N.N.; Vylomov, V.V.

    1996-01-01

    Comprehensive experience has been gained with the operating fast reactor BN-600 with a power out of 600 MWe. This paper includes important performance results and gives also an overview of the experience gained from BN-600 NPP commercial operation during 15 years. (author). 2 figs, 1 tab

  1. Human Resources Training Requirement on NPP Operation and Maintenance

    International Nuclear Information System (INIS)

    Nurlaila; Yuliastuti

    2009-01-01

    This paper discussed the human resources requirement on Nuclear Power Plant (NPP) operation and maintenance (O&M) phase related with the training required for O&M personnel. In addition, this paper also briefly discussed the availability of training facilities domestically include with some suggestion to develop the training facilities intended for the near future time in Indonesia. This paper was developed under the assumptions that Indonesia will build twin unit of NPP with capacity 1000 MWe for each using the turnkey contract method. The total of NPP O&M personnel were predicted about 692 peoples which consists of 42 personnel located in the head quarter and the rest 650 people work at NPP site. Up until now, Indonesia had the experience on operating and maintaining the nonnuclear power plant and several research reactors namely Kartini Reactor Yogyakarta, Triga Mark II Reactor Bandung, and GA Siwabessy Reactor Serpong. Beside that, experience on operating and maintaining the NPP in other countries would act as one of the reference to Indonesia in formulating an appropriate strategy to develop NPP human resources particularly in O&M phases. Education and training development program could be done trough the cooperation with vendor candidates. (author)

  2. Change of secondary water regime of Paks NPP. Change of secondary water regime at Unit 2

    International Nuclear Information System (INIS)

    Doma, A.; Patek, G.; Pinter, T.; Bajari, M.; Tilky, P.

    2001-01-01

    The installation of high pH water regime during the 17th cycle of Unit 2 aimed to decrease the amount of transportation inlet of erosion-corrosion products (magnitude) in feedwater to SGs. The resolution of OAH-NBI permitting the installation ordained to make an evaluation of the process. The main conclusions and results are discussed. The high pH water regime proved to be adequate in the case of Unit 2 as well, similarly to Units 3, 4 and 1. (R.P.)

  3. On improving the NPP construction long-term planning

    International Nuclear Information System (INIS)

    Solov'ev, M.M.

    1980-01-01

    General approaches to solving the problems of long-term planning of the construction-mounting work volume and introduction of power capacities at different paces of power unit commission and norms of construction time are considered. Problems associated with location and development of subsidiary industries providing NPP construction are discussed. It is shown that decrease of WWER-1000 reactor type NPP construction time from 24 to 12 months results in reduction of required high-skilled engineers, managerial staff, unique construction mechanisms and engines as well as in improvement of conditions for conducting measures on work arrangement during preparation of construction industry and mounting of the first assemblies

  4. Problems of complex automation of process at a NPP

    International Nuclear Information System (INIS)

    Naumov, A.V.

    1981-01-01

    The importance of theoretical investigation in determining the level and quality of NPP automation is discussed. Achievements gained in this direction are briefly reviewed on the example of domestic NPPs. Two models of the problem solution on function distribution between the operator and technical means are outlined. The processes subjected to automation are enumerated. Development of the optimal methods of power automatic control of power units is one of the most important problems of NPP automation. Automation of discrete operations especially during the start-up, shut-down or in imergency situations becomes important [ru

  5. NPP Cernavoda unit 2 economic viability: The challenge for an advanced financing scheme

    International Nuclear Information System (INIS)

    Condu, M.; Popescu, D.

    1999-01-01

    The completion of Cernavoda Unit-2 being no doubt, the viability of the project was analyzed and strengthened. Economic justification of the decision to complete Unit-2 is described, including assessment of its safety design guides, design requirements and engineering design solutions in the light of changes in codes, guideline, standards and actual regulatory requirements. Cost-benefit analysis demonstrates the economic viability of the project

  6. Analysis of Novo-Voronezh NPP unit 3 radiation lifetime of the WWER-440 reactor pressure vessel given samplings

    International Nuclear Information System (INIS)

    Kiselyov, V.; Korinets, A.; Maksimov, Yu.; Piminov, V.

    1997-01-01

    The analysis of the residual radiation lifetime of the Novo-Voronezh NPP Unit 3 reactor pressure vessel which had spherical samplings after annealing was performed for the spectrum of the 'worst' modes of the emergency situation category. For the residual radiation lifetime estimation within the given study, two approaches to determine stress intensity factors, K I , have been used simultaneously. The first approach included a direct numeric modelling of postulated cracks in the cut-out zone with the use of the 3D finite element method. The second approach included K 1 calculation using 3D weight functions calculated with the use of the boundary element method. For K I , calculation flaws have been postulated as surface longitudinal semielliptical flaws located in the deepest point of a cut-out. The results of K I calculations obtained using different methods were practically the same. The allowable critical brittleness temperature was determined as 175 C that permitted the extension of the radiation lifetime by up to 6 years after annealing. (orig.)

  7. NPP Temelin automatic monitoring and diagnostic system of secondary side of the unit 1

    International Nuclear Information System (INIS)

    Heidenreich, S.; Pisl, M.; Drab, F.

    1997-01-01

    Two measuring and evaluating systems by SKODA PRAHA are described, designed for the Temelin nuclear power plant: a permanent secondary side diagnostic system for technology monitoring in the period of startup and operation; and the system of physical and power starting-up for monitoring during the first and repeated startup. The purposes of both systems are outlined. The scope of diagnostics covered and the functioning of the secondary side system is dealt with in some detail. (A.K.)

  8. Dynamic model for tritium build-up at NPP with RBMK type reactors and its enviromental beraviour

    International Nuclear Information System (INIS)

    Badyaev, V.V.; Egorov, Yu.A.; Ivanov, E.A.; Stegachev, G.F.; Tolstykh, V.D.

    1982-01-01

    A model of tritium production dynamics for a high power NPP with RBMK type reactors is proposed and investigated. The main ''skeleton'' model structure for forecasting tritium buildup at a NPP and its exchange with the environment has been singled out at a heuristic level. Decomposition and layout of the units have been performed by global functional relations of the investigated objects (NPP and environment). the model accounts for only oxidized tritium forms. Water exchange between the NPP subsystems and environment is the main mechanism for tritium migration. The model does not account for scheduled periodic maintenance work effects, presence of stagnant zones in the station circuits, fuel burn-up, etc. The parametric identification method applied in the model makes the model adaptable to particular situations and considered systems of the NPP and environment. Completing the model with necessary and sufficient experimental data one can pass to certain forecasting problems and to NPP control as a tritium source in the environment

  9. The post-accidents exploitation of Chernobyl NPP

    International Nuclear Information System (INIS)

    Nosovskij, A.V.

    1996-01-01

    Problems facing the Chernobyl NPP personnel since its commissioning and during its post-accident operation are considered. The accomplished measures on improving the power units safety, normalization of the radiation situation as well as the impact of psychological factor at the safety culture level are discussed

  10. Joint U.S./Russian Study on the Development of a Preliminary Cost Estimate of the SAFSTOR Decommissioning Alternative for the Leningrad Nuclear Power Plant Unit #1

    Energy Technology Data Exchange (ETDEWEB)

    SM Garrett

    1998-09-28

    The objectives of the two joint Russian/U.S. Leningrad Nuclear Power Plant (NPP) Unit #1 studies were the development of a safe, technically feasible, economically acceptable decom missioning strategy, and the preliminary cost evaluation of the developed strategy. The first study, resulting in the decommissioning strategy, was performed in 1996 and 1997. The preliminary cost estimation study, described in this report, was performed in 1997 and 1998. The decommissioning strategy study included the analyses of three basic RBM.K decommission- ing alternatives, refined for the Leningrad NPP Unit #1. The analyses included analysis of the requirements for the planning and preparation as well as the decommissioning phases.

  11. Generating units performances: power system requirements

    Energy Technology Data Exchange (ETDEWEB)

    Fourment, C; Girard, N; Lefebvre, H

    1994-08-01

    The part of generating units within the power system is more than providing power and energy. Their performance are not only measured by their energy efficiency and availability. Namely, there is a strong interaction between the generating units and the power system. The units are essential components of the system: for a given load profile the frequency variation follows directly from the behaviour of the units and their ability to adapt their power output. In the same way, the voltage at the units terminals are the key points to which the voltage profile at each node of the network is linked through the active and especially the reactive power flows. Therefore, the customer will experience the frequency and voltage variations induced by the units behaviour. Moreover, in case of adverse conditions, if the units do not operate as well as expected or trip, a portion of the system, may be the whole system, may collapse. The limitation of the performance of a unit has two kinds of consequences. Firstly, it may result in an increased amount of not supplied energy or loss of load probability: for example if the primary reserve is not sufficient, a generator tripping may lead to an abnormal frequency deviation, and load may have to be shed to restore the balance. Secondly, the limitation of a unit performance results in an economic over-cost for the system: for instance, if not enough `cheap` units are able to load-following, other units with higher operating costs have to be started up. We would like to stress the interest for the operators and design teams of the units on the one hand, and the operators and design teams of the system on the other hand, of dialog and information exchange, in operation but also at the conception stage, in order to find a satisfactory compromise between the system requirements and the consequences for the generating units. (authors). 11 refs., 4 figs.

  12. Kozloduy NPP units 5 and 6 modernization program. Measures implementation in outages

    International Nuclear Information System (INIS)

    Naydenov, N.; Mignone, O.

    2004-01-01

    The units 5 and 6 modernization program is a highly demanding program composed by many plant modifications and studies about plant conditions. The program measures implementation during the units outages represents a challenge by the need to compromise shut down duration with the workload related to measures installation. The units shutdown duration should be kept to the planned duration. In parallel, contractors work has to be organized, planned and performed to allow successful measures completion. In accordance with the contract requirements, contractors prepare installation documents which comprise all activities to be performed during the installation and testing of the measures. The subcontractors complement these installation documents with the project organization and execution documents, which include the manpower skills, qualifications, work orders, and other important installation instructions and information. Contractors prepared detailed installation schedules, and these were integrated by Parsons E and C in the Integrated installation schedule. The integrated schedule proved to be useful to identify possible area usage conflicts and manpower overlapping, with appropriate results for electrical, instrumentation and control work, and for the utilization of the polar crane in the containment building. Contractors installation schedules were updated on a weekly basis, showing variances versus the target, and manpower histograms for the resource loading. Organization of contractors work was supported by KNPP plant outage meetings, in which status and problems were addressed, and solution and/or corrective actions defined for further implementation. KNPP meetings were planned on a daily basis for most relevant or critical measures, or on a weekly basis for less intensive measures. KNPP meetings proved to be an excellent communication tool for keeping the measures under control and monitoring KNPP defined personnel responsible for authorizing changes, in

  13. Assessment of the residual lifetime of the units 3 and 4 of the Kozloduy NPP

    International Nuclear Information System (INIS)

    Mojkinski, G.

    2011-01-01

    The purpose of the report is to present the methodology for the residual lifetime assessment for the buildings and facilities during the decommissioning. An analysis of the existing facilities and constructions is made and requirements for further exploitation are set. A quantitative assessment is made of the residual lifetime for the buildings and auxiliary objects for the units 3 and 4. A detailed analysis is made for the ventilation systems and other equipment. Recommendations are given for the extension of the equipment lifetime

  14. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 4B. Paks NPP: Analysis/testing. Working material

    International Nuclear Information System (INIS)

    1995-01-01

    The Co-ordinated research programme on the benchmark study for the seismic analysis and testing of WWER-type nuclear power plants was initiated subsequent to the request from representatives of Member States. The conclusions adopted at the Technical Committee Meeting on Seismic Issues related to existing nuclear power plants held in Tokyo in 1991 called for the harmonization of methods and criteria used in Member States in issues related to seismic safety. The Consulltants' Meeting which followed resulted in producing a working document for CRP. It was decided that a benchmark study is the most effective way to achieve the principal objective. Two types of WWER reactors (WWER-440/213 and WWER-1000) were selected as prototypes for the benchmark exercise to be tested on a full scale using explosions and/or vibration generators. The two prototypes are Kozloduy Units 5/6 for WWER-1000 and Paks for WWER-440/213 nuclear power plants. This volume of Working material contains reports on dynamic study of the main building of the Paks NPP; shake table investigation at Paks NPP and the Final report of the Co-ordinated Research Programme

  15. Irradiation Embrittlement Monitoring Programs of RPV's in the Slovak Republic NPP's

    International Nuclear Information System (INIS)

    Kupca, Ludovik

    2006-01-01

    Four types of surveillance programs were (are) realized in Slovak NPP's: 'Standard Surveillance Specimen Program' (SSSP) was finished in Jaslovske Bohunice V-2 Nuclear Power Plant (NPP) Units 3 and 4, 'Extended Surveillance Specimen Program' (ESSP), was prepared for Jaslovske Bohunice NPP V-2 with aim to validate the SSSP results, For the Mochovce NPP Unit 1 and 2 was prepared completely new surveillance program 'Modern Surveillance Specimen Program' (MSSP), based on the philosophy that the results of MSSP must be available during all NPP service life, For the Bohunice V-1 NPP was finished 'New Surveillance Specimen Program' (NSSP) coordinated by IAEA, which gave arguments for prolongation of service life these units for minimum 20 years, New Advanced Surveillance Specimen Program (ASSP) for Bohunice V-2 NPP (units 3 and 4) and Mochovce NPP (units 1, 2) is approved now. ASSP is dealing with the irradiation embrittlement of heat affected zone (HAZ) and RPV's austenitic cladding, which were not evaluated till this time in surveillance programs. SSSP started in 1979 and was finished in 1990. ESSP program started in 1995 and will be finished in 2007, was prepared with aim of: increasing of neutron fluence measurement accuracy, substantial improvement the irradiation temperature measurement, fixed orientation of samples to the centre of the reactor core, minimum differences of neutron dose for all the Charpy-V notch and COD specimens, the dose rate effect evaluation. In the year 1996 was started the new surveillance specimen program for the Mochovce RPV's unit-1 and 2, based on the fundamental postulate - to provide the irradiation embrittlement monitoring till the end of units operation. The 'New Surveillance Specimen Program' (NSSP) prepared in the year 1999 for the Bohunice V-1 NPP was finished in the year 2004. Main goal of this program was to evaluate the weld material properties degradation due to the irradiation and recovery efficiency by annealing too. The

  16. Seismic safety review mission for the follow-up of the seismic upgrading of Kozloduy NPP (Units 1-4). Sofia, Bulgaria, 16-20 November 1992

    International Nuclear Information System (INIS)

    David, M.; Shibata, H.; Stevenson, J.D.; Godoy, A.; Gurpinar, A.

    1992-11-01

    A Seismic Safety Review Mission for the follow-up of the design and implementation of the seismic upgrading of Kozloduy NPP was performed in Sofia from 16-20 November 1992. This mission continued the second task of the follow-up activities of the design and implementation of the seismic upgrading (Phases 1 and 2), which is being carried out in Units 1 and 2 of the NPP. Thus the objectives of the mission was to assist the Bulgarian authorities in the technical evaluation of the design tasks defined for Phases 1 and 2 item HB of WANO 6 Month Programme, as follows: anchorage upgrades of low seismic capacity components; list of seismic safety related systems and components; detailed walkdown to assess seismic capacity of components and define priorities for the upgrading; determination of seismic structural capacity of pump house, diesel generator building and turbine building and design of required upgrades; liquefaction potential evaluation. Tabs

  17. Decommissioning of Kozloduy NPP units 1÷4 progress and challenges

    International Nuclear Information System (INIS)

    Kazakov, Momchil

    2016-01-01

    The process of decommissioning of Units 1 to 4 is under implementation according to the approved schedule and dismantling work in the TH is expected to be completed in due time, i.e. the end of 2018. Management of dismantled materials is difficult due to the lack of licensed sites for management of materials from the decommissioning activities, as well as due to the long free release procedures. In order to solve the above mentioned issues, measures have been taken concerning the design and construction of sites for management of materials from the decommissioning activities and in respect of the release of material from regulatory control. The preparation of the CA and auxiliary buildings for dismantling has started on schedule, as well as the dismantling of potentially contaminated equipment; Management and treatment of decommissioning RAM and RAW will be assisted by putting into operation of the Size Reduction and Decontamination Workshop (SRDW) and Plasma Melting Facility (PMF) which is scheduled for 2017; Management of RAW from the Mortuaries in the CA is another challenge for SERAW and in that regard a Feasibility Study for the Management of “Mogilnik” storages of KNPP Units 1-4 is first planned to be carried out and thereafter a management approach is to be selected; Regarding dismantling in the CA, SERAW is in the process of Elaboration of a Design for Dismantling of Equipment in the Controlled Areas of KNPP Units 1-4; Based on the selected option for dismantling, particularly the Reactor Pressure Vessel (RPV), reactor internals and the rest activated components, the Consultant shall justify by relevant analyses the requirement for temporary storage areas for activated equipment by complying with the best international practices

  18. Procedure for validating the life extension for the WWER-440 internals at NV NPP unit 3

    International Nuclear Information System (INIS)

    Filatov, V.M.; Evropin, S.V.

    2001-01-01

    The design lifetime (30 years) of the 1st generation WWER-440 reactor facilities is nearing completion in Russia. One of the major problems is to validate the life extension (LE) of the reactor internals ensuring the core arrangement and free passage of the control and protection system components during different operating modes, emergency modes included. The internals at the 1st generation units are designed so that to enable their replacement. But it requires a lot of funds and time. The work has been done to demonstrate that the internals may be further safely operated without their components being replaced provided their strength, longevity and serviceability are sufficiently validated. (author)

  19. Nuclear and thermal power plant power ramping capability

    International Nuclear Information System (INIS)

    Golovach, E.A.

    1983-01-01

    The possibilities of step power increase by NPP and TPP units under emergency conditions of power grids operation are considered. The data analysis has shown that power units ramping capability with WWER-440, WWER-1000 and RBMK-1000 reactors is higher than that of 300 MW power units on fossil fuel, at the initial time interval (0-30 s). These NPP power units satisfy as to ramping capability the energy system requirements. Higher NPP power units ramping capability is explained by the fact that relative pressure before turbine valves is decreased less than in straight-through boilers while the steam volumes time constant of steam separator-superheaters is less than that of intermediate superheatings. Higher power unit ramping capability with WWER-440 and RBMK-1000 reactors as compared with the WWER-1000 reactor is pointed out as well as the increase of WWER-1000 power unit capability using high-speed turbines

  20. Sitting Safety Aspects of Second Romanian NPP

    International Nuclear Information System (INIS)

    Mauna, T.

    2010-01-01

    The first Romanian NPP CANDU 6 type reactor gone to erection in 1980 on Cernavoda site planned to have 5 units like the Wolsong applied design project for nuclear island. For the BOP parts the ASALDO-GE project was applied with the careful about the interface connection NSP requirements. The new NPP sitting studies began from 1982 in a serious manner as first part on Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. For develop the all package of the studies in concordance with the first IAEA Safety Standards recommendations. Till the 1982 the first mission of design and research multi-branch of specialists team was to adapt the NPP Cernavoda project having a open water cooling circuit to the new parameters of close water cooling circuit. But the team was looking at the other type of NPP for sitting. Also in the same time was studied the possibility of NSP foundation on hard less or soft soil foundation strata in connection with safety aspects. The close circuit of cooling water means others parameters of systems and need very large cooling towers. Also must be reconsidering the safety systems design and performance as new solution. In the south of Transylvania historical region in Romania the Olt River run from west to east having medium multi annual flow around 70 m3/s. The Olt River has a chain of small hydropower in operation and other planned. From geological and geophysical points of view two main faults, along the Olt river valley, one of this having seismically small activities was detected. Site region geotechnical studies show small quantity underground natural gas, salt and peat. The initial nuclear program has imposed 4 NPP units site near Olt River. Taking into account the orogenesis, water cooling needs and other local feature can't be built more than two NPP units on a site. This paper tries to reconsider the old analysis from the last IAEA Safety Standards point of view taking into account the new

  1. Analysis of Depressurization Performance in Containment of Wolsong NPP Unit 1 through Containment Filtered Venting System

    International Nuclear Information System (INIS)

    Lee, Sunghan; Kim, Jinhyuck; Suh, Nam Duk; Cho, Songwon

    2014-01-01

    Containment filtered venting system (CFVS) is designed to open and to close isolation valves passively by an operator. CFVS is operated when the containment pressure exceeds the design pressure (225 kPa(a)) and is closed when the containment pressure decreases below 151 kPa(a). The aim of this study is to analyze the depressurization performance of Wolsong unit 1 through CFVS during SBO. The thermal-hydraulic behavior in containment of Wolsong unit 1 was evaluated using the MELCOR 1.8.6 code developed at Sandia National Laboratories (SNL) for the U.S. Nuclear Regulatory Commission (NRC). In addition, in order to evaluate the effects of the CFVS according to the venting area, a sensitivity study depending on different venting area of the CFVS was conducted. Finally, an analysis of the effects of filtering and scrubbing of radioactive material for CFVS is important but not treated in this paper. The SBO accident is chosen to analyze the thermal-hydraulic behavior of Wolsong unit 1. During SBO, the analysis of CFVS affecting on the depressurization of the containment was conducted using MELCOR 1.8.6 code. Also, a sensitivity study was carried out to evaluate the depressurization performance according to the venting area of CFVS. The results show that the containment pressure is considerably decreased and the integrity of the containment could be maintained in case of CFVS operating. Therefore, CFVS has the capacity to keep the containment pressure below the design pressure during SBO. In addition, there are large differences in the containment pressure depending on venting area. We found that the decreasing rate of the pressure in the containment and water level in CFVS depends on the venting area. In the future, a proper requirement for CFVS sizing criteria according to accident scenarios such as LBLOCA, SBLOCA and SGTR, etc. should be evaluated in order to review the licensing for CFVS. Finally, analyses of aerosols, fission product, and radioactive material

  2. Nuclear power plant V-2

    International Nuclear Information System (INIS)

    1998-01-01

    The nuclear power plant Bohunice V -2 is briefly described. This NPP consists from two reactor units. Their main time characteristics are (Reactor Unit 1, Reactor Unit 2): beginning of construction - December 1976; first controlled reactor power - 7 August 1984, 2 August 1985; connection to the grid - 20 August 1984, 9 August 1985; commercial operation - 14 February 1985, 18 December 1985. This leaflet contains: NPP V-2 construction; Major technological equipment [WWER 440 V230 type reactor; Nuclear Power plant operation safety (Safety barriers; Safety systems [Active safety systems, Passive safety systems]); Centralized heat supply system; Scheme of Bohunice V-2 NPP and technical data

  3. European type NPP electric power and vent systems. For safety improvement and proposal of international center

    International Nuclear Information System (INIS)

    Sugiyama, Kenichiro

    2011-01-01

    For prevention of reactor accidents of nuclear power plants, multiplicity and redundancy of emergency power would be most important. At station blackout accident, European type manually operated vent operation could minimize release amount of radioactive materials and keep safety of neighboring residents. After Fukushima Daiichi accident, nuclear power plants could not restart operation even after completion of periodical inspection. This article introduced European type emergency power and vent systems in Swiss, Sweden and Germany with state of nuclear power phaseout for reference at considering to upgrade safety and accident mitigation measures for better understanding of the public. In addition, it would be important to recover trust of nuclear technology to continue to disseminate latest information on new knowledge of accident site and decontamination technologies to domestic and overseas people. As its implementation, establishment of Fukushima international center was proposed. (T. Tanaka)

  4. Construction of the jet-vortex condenser at the Kozloduy NPP units 3 and 4

    International Nuclear Information System (INIS)

    Genovski, I.; Bonev, B.; Grigorov, A.; Sabinov, S.; Petlov, M.

    2003-01-01

    The paper present the behavior of the accident localization system in case of pipeline rupture in the primary circuit of the units 3 and 4 after the implementation of the modernization program. The program includes installation of a jet-vortex condenser. The cases with double rapture of a pipeline D y 200 mm and D y 500 mm are described. In the result of the program implementation the radiation consequences are significantly limited due to the condenser playing the role of a filter during the first second of the accident as well as due to the low values of the pressure during the whole accident. Thus the modernization program fulfills its purpose to assure non-exceeding of the radiation limits in case of double rupture of a main circulation pipeline

  5. Nuclear power in the United States

    International Nuclear Information System (INIS)

    Johnston, J.B.

    1985-01-01

    All over the world except in the United States, nuclear energy is a low cost, secure, environmentally acceptable form of energy. In the United States, civilian nuclear power is dead. 112 nuclear power plants have been abandoned or cancelled in the last decade, and there has been no new order for nuclear plants since 1978. It will be fortunate to have 125 operating nuclear plants in the United States in the year 2000. There are almost 90 completed nuclear power plants and about 45 under construction in the United States, but several of those under construction will eventually be abandoned. About 20 % of the electricity in the United States will be generated by nuclear plants in 2000 as compared with 13 % supplied in the last year. Under the present regulatory and institutional arrangement, American electric utilities would not consider to order a new nuclear power plant. Post-TMI nuclear plants became very expensive, and there is also ideological opposition to nuclear power. Coal-firing plants are also in the similar situation. The uncertainty about electric power demand, the cost of money, the inflation of construction cost and regulation caused the situation. (Kako, I.)

  6. Use of operator training and simulating complexes for development of NPP APCS

    International Nuclear Information System (INIS)

    Malkin, S.D.; Rakitin, I.D.; Sivokon', V.P.

    2002-01-01

    The evolution of NPP educational facilities - from systems of training of personnel to power simulating systems for the development of Automatic Process Control System (APCS) and safety analysis is followed. High efficiency of simulating systems application for the development of NPP APCS including optimization of man-machine system interface was shown by experiments of USA, France, Japan, United Kingdom, conforming examples were given [ru

  7. Bohunice V1 NPP upgrading programme

    International Nuclear Information System (INIS)

    Kerak, J.

    2001-01-01

    The paper describes whole process of Bohunice V1 NPP nuclear safety and operational reliability level increase which has been performed since units commissioning (1. unit in 1978, 2. unit in 1980), continued Small Reconstruction (1991 -1993) and finished Gradual Upgrading(1994 -2000). The main purpose is to last stage -Gradual upgrading of Bohunice V1 NPP. (author)

  8. Development of Highly Reliable Power and Communication System for Essential Instruments Under Severe Accidents in NPP

    Directory of Open Access Journals (Sweden)

    Bo Hwan Choi

    2016-10-01

    Full Text Available This article proposes a highly reliable power and communication system that guarantees the protection of essential instruments in a nuclear power plant under a severe accident. Both power and communication lines are established with not only conventional wired channels, but also the proposed wireless channels for emergency reserve. An inductive power transfer system is selected due to its robust power transfer characteristics under high temperature, high pressure, and highly humid environments with a large amount of scattered debris after a severe accident. A thermal insulation box and a glass-fiber reinforced plastic box are proposed to protect the essential instruments, including vulnerable electronic circuits, from extremely high temperatures of up to 627°C and pressure of up to 5 bar. The proposed wireless power and communication system is experimentally verified by an inductive power transfer system prototype having a dipole coil structure and prototype Zigbee modules over a 7-m distance, where both the thermal insulation box and the glass-fiber reinforced plastic box are fabricated and tested using a high-temperature chamber. Moreover, an experiment on the effects of a high radiation environment on various electronic devices is conducted based on the radiation test having a maximum accumulated dose of 27 Mrad.

  9. Development of highly reliable power and communication system for essential instruments under severe accidents in NPP

    International Nuclear Information System (INIS)

    Choi, Bo Hwan; Jang, Gi Chan; Shin, Sung Min; Kang, Hyun Gook; Rim, Chun Taek; Lee, Soo Ill

    2016-01-01

    This article proposes a highly reliable power and communication system that guarantees the protection of essential instruments in a nuclear power plant under a severe accident. Both power and communication lines are established with not only conventional wired channels, but also the proposed wireless channels for emergency reserve. An inductive power transfer system is selected due to its robust power transfer characteristics under high temperature, high pressure, and highly humid environments with a large amount of scattered debris after a severe accident. A thermal insulation box and a glass-fiber reinforced plastic box are proposed to protect the essential instruments, including vulnerable electronic circuits, from extremely high temperatures of up to 627 .deg. C and pressure of up to 5 bar. The proposed wireless power and communication system is experimentally verified by an inductive power transfer system prototype having a dipole coil structure and prototype Zigbee modules over a 7-m distance, where both the thermal insulation box and the glass-fiber reinforced plastic box are fabricated and tested using a high-temperature chamber. Moreover, an experiment on the effects of a high radiation environment on various electronic devices is conducted based on the radiation test having a maximum accumulated dose of 27 Mrad

  10. Development of highly reliable power and communication system for essential instruments under severe accidents in NPP

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Bo Hwan; Jang, Gi Chan; Shin, Sung Min; Kang, Hyun Gook; Rim, Chun Taek [Dept. of Nuclear and Quantum Engineering, Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Lee, Soo Ill [I and C Group, Korea Hydro and Nuclear Power Co., Ltd, Central Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    This article proposes a highly reliable power and communication system that guarantees the protection of essential instruments in a nuclear power plant under a severe accident. Both power and communication lines are established with not only conventional wired channels, but also the proposed wireless channels for emergency reserve. An inductive power transfer system is selected due to its robust power transfer characteristics under high temperature, high pressure, and highly humid environments with a large amount of scattered debris after a severe accident. A thermal insulation box and a glass-fiber reinforced plastic box are proposed to protect the essential instruments, including vulnerable electronic circuits, from extremely high temperatures of up to 627 .deg. C and pressure of up to 5 bar. The proposed wireless power and communication system is experimentally verified by an inductive power transfer system prototype having a dipole coil structure and prototype Zigbee modules over a 7-m distance, where both the thermal insulation box and the glass-fiber reinforced plastic box are fabricated and tested using a high-temperature chamber. Moreover, an experiment on the effects of a high radiation environment on various electronic devices is conducted based on the radiation test having a maximum accumulated dose of 27 Mrad.

  11. MEASUREMENTS OF THE CONFINEMENT LEAKTIGHTNESS AT THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    International Nuclear Information System (INIS)

    GREENE, G.A.; GUPPY, J.G.

    1998-01-01

    This is the final report on the INSP project entitled, ''Kola Confinement Leaktightness'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.1. This project was initiated in February 1993 to assist the Russians to reduce risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Units 1 and 2, through upgrades in the confinement performance to reduce the uncontrolled leakage rate. The major technical objective of this-project was to improve the leaktightness of the Kola NPP VVER confinement boundaries, through the application of a variety of sealants to penetrations, doors and hatches, seams and surfaces, to the extent that current technology permitted. A related objective was the transfer, through training of Russian staff, of the materials application procedures to the staff of the Kola NPP. This project was part of an overall approach to minimizing uncontrolled releases from the Kola NPP VVER440/230s in the event of a serious accident, and to thereby significantly mitigate the consequences of such an accident. The US provided materials, application technology, and applications equipment for application of sealant materials, surface coatings, potting materials and gaskets, to improve the confinement leaktightness of the Kola VVER-440/23Os. The US provided for training of Russian personnel in the applications technology

  12. MEASUREMENTS OF THE CONFINEMENT LEAKTIGHTNESS AT THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    Energy Technology Data Exchange (ETDEWEB)

    GREENE,G.A.; GUPPY,J.G.

    1998-08-01

    This is the final report on the INSP project entitled, ``Kola Confinement Leaktightness'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.1. This project was initiated in February 1993 to assist the Russians to reduce risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Units 1 and 2, through upgrades in the confinement performance to reduce the uncontrolled leakage rate. The major technical objective of this-project was to improve the leaktightness of the Kola NPP VVER confinement boundaries, through the application of a variety of sealants to penetrations, doors and hatches, seams and surfaces, to the extent that current technology permitted. A related objective was the transfer, through training of Russian staff, of the materials application procedures to the staff of the Kola NPP. This project was part of an overall approach to minimizing uncontrolled releases from the Kola NPP VVER440/230s in the event of a serious accident, and to thereby significantly mitigate the consequences of such an accident. The US provided materials, application technology, and applications equipment for application of sealant materials, surface coatings, potting materials and gaskets, to improve the confinement leaktightness of the Kola VVER-440/23Os. The US provided for training of Russian personnel in the applications technology.

  13. Solar power water distillation unit

    International Nuclear Information System (INIS)

    Hameed, Kamran; Khan, Muhammad Muzammil; Ateeq, Ijlal Shahrukh; Omair, Syed Muhammad; Ahmer, Muhammad; Wajid, Abdul

    2013-01-01

    Clean drinking water is the basic necessity for every human being, but about 1.1 billion people in the world lacked proper drinking water. There are many different types of water purification processes such as filtration, reverse osmosis, ultraviolet radiation, carbon absorption, but the most reliable processes are distillation and boiling. Water purification, such as distillation, is especially important in regions where water resources or tap water is not suitable for ingesting without boiling or chemical treatment. In design project It treats the water by combining different methods such as Filtration, Distillation and a technique called concentrated solar power (CSP). Distillation is literally the method seen in nature, whereby: the sun heats the water on the earth's surface, the water is turned into a vapor (evaporation) and rises, leaving contaminants behind, to form clouds. As the upper atmosphere drops in temperature the vapors cool and convert back to water to form water. In this project distillation is achieved by using a parabolic mirror which boils water at high temperature. Filtration is done by sand filter and carbon filter. First sand filter catches the sand particles and the carbon filter which has granules of active carbon is used to remove odor dissolved gases from water. This is the Pre-treatment of water. The filtered water is then collected in a water container at a focus of parabolic mirror where distillation process is done. Another important feature of designed project is the solar tracking of a parabolic mirror which increases the efficiency of a parabolic mirror [1],[2].

  14. Examination of steam generator alloy 800 NG tube from the Almaraz unit 2 NPP

    International Nuclear Information System (INIS)

    Diego, G. de; Gomez Briceno, D.; Maffiotte, C.; Baladia, M.; Arias, C.J.

    2015-01-01

    The steam generators of Almaraz Unit 2 were replaced in 1997 by the model 61W/D3 (Siemens) with Alloy 800NG steam generator tubes. Denting indications were firstly detected in 2006 in the SG-3. Crack indications were identified in 2009. At the end of 2011, three tubes were recovered from this steam generator to carry out destructive examination in order to identify the root cause of the tubes degradation. Analysis of deposits point out the existence of multiples elements in the removed OD (Outer Diameter) deposits as well as in the deposits at the free tube under sludge and at the transition zone. Deposits are more abundant at the transition zone than at free tube. About 10% Na concentration has been detected, whereas S and Cl appear in small concentrations. Si appears regularly and Cr, Ni concentrations in the deposits are similar. Multiple intergranular cracks have been detected at 3 mm above the last contact point between the tube and the TS (tube support), in a band of around 5 mm, practically in the whole perimeter of the tube. Fracture surface of crack-B was partially covered by a Si rich layer, whereas fracture surface of crack-A seems to be cleaner. However, no significant differences in composition, except higher amount of S in crack-B, were found in the deposits of both cracks. EDX mapping and Auger profiles point out Ni enrichment with slight Cr enrichment or depletion and Fe depletion. The comparison of Auger profiles with available results for Alloy 800 tested in caustic and acid sulfate environments seems to indicate that the environment inside the cracks detected in the tube R67C48 is neutral or moderately caustic

  15. Optimization of radiation protection at Bohunice NPP

    International Nuclear Information System (INIS)

    Dobis, L.; Svitek, J.

    2003-01-01

    Bohunice Nuclear Power Plant is situated in south - western part of Slovakia about 50 km away from Bratislava. There are four PWR reactors 440 MW e each - two units with reactors WWER - 230 (V1 NPP) and two units with WWER - 213 (V2 NPP). requirements for the optimization process are given in the mentioned Code No.12 of Ministry of Health. Code 12 stipulates the technical and organizational requirements for proving the Rational Achievable Level (RAL) of radiation protection. This level can be proved by means of the comparison of the dose distribution to the costs of protection. An example of two figures of dose constraints is: collective dose 20 man mSv for the specific task; individual exposure 1 mSv per day. The values of the financial equivalents of personal exposure - so called the alpha coefficients - are used for the calculation of the benefit of proposed measures. Impact of legislative changes into Bohunice NPP and optimization process are presented. Apparently the new law and the associate code created a base of transparent and understandable policy of radiation protection and optimization in Slovak Republic. The radiation protection legislative was implemented into the praxis and persons became familiar with it. Defining clear and unambiguous terms facilitated the communication between users and the regulatory body - State Health Institute. Optimization was generally accepted by the workers and managers and began to be a part of safety culture of operation at nuclear power plants. (authors)

  16. Human resource development for the new nuclear power plant unit in Armenia

    International Nuclear Information System (INIS)

    Gevorgyan, A.; Galstyan, A.; Donovan, M.

    2008-01-01

    This paper presents a discussion of a study to define the programs for development of the human resource infrastructure needed for a new nuclear power plant unit in the Republic of Armenia. While Armenia has a workforce experienced in operation and regulation of a nuclear power plant (NPP), a significant portion of the current Armenia Nuclear Power Plant (ANPP) workforce is approaching retirement age and will not be available for the new plant. The Government of Armenia is performing a human resource infrastructure study in cooperation with the International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO), sponsored by the JAEA. The study of Human Resource Development for Armenia uses the INPRO methodology for assessment of human resources. The results of this study will provide the basis for decisions on human resource development programs for nuclear power in Armenia and provide a model for countries with the limited resources that are working to develop nuclear energy in the future. (authors)

  17. NPP Temelin instrumentation and control system upgrade and verification

    International Nuclear Information System (INIS)

    Ubra, O.; Petrlik, J.

    1998-01-01

    Two units of Ver 1000 type of the Czech nuclear power plant Temelin, which are under construction are being upgraded with the latest instrumentation and control system delivered by WEC. To confirm that the functional design of the new Reactor Control and Limitation System, Turbine Control System and Plant Control System are in compliance with the Czech customer requirements and that these requirements are compatible with NPP Temelin upgraded technology, the verification of the control systems has been performed. The method of transient analysis has been applied. Some details of the NPP Temelin Reactor Control and Limitation System verification are presented.(author)

  18. The evolution of the fuel cycle in the Dukovany NPP

    Energy Technology Data Exchange (ETDEWEB)

    Bajgl, J [Jaderna Elektrarna, Dukovany (Czech Republic)

    1994-12-31

    The ten-year operational experience of four WWER-440 units in Dukovany NPP with a total number of 35 cycles is outlined. The strategy of fuel reloading has been changed from out-in schemes to low-leakage patterns. The linear pin power limitation will be introduced. The main physical limits and conditions for the NPP operation are listed. The main goal is to go to a full 4-year fuel cycle in which the burnup will be about 40 Mwd/kg U. 6 tabs.

  19. The seismic reassessment Mochovce NPP

    International Nuclear Information System (INIS)

    Baumeister, P.

    2004-01-01

    The design of Mochovce NPP was based on the Novo-Voronez type WWER-440/213 reactor - twin units. Seismic characteristic of this region is characterized by very low activity. Mochovce NPP site is located on the rock soil with volcanic layer (andesit). Seismic reassessment of Mochovce NPP was done in two steps: deterministic approach up to commissioning confirmed value Horizontal Peak Ground Acceleration HPGA=0.1 g and activities after commissioning as a consequence of the IAEA mission indicate higher hazard values. (author)

  20. Challenges of Ignalina NPP Decommissioning - View of Lithuanian Operator

    International Nuclear Information System (INIS)

    Aksionov, P.

    2017-01-01

    The state enterprise Ignalina Nuclear Power Plant (INPP) operates 2 similar design units of RBMK-1500 water-cooled graphite-moderated channel-type power reactors (1500 MW electrical power). INPP is carrying out the decommissioning project of the 2 reactors which includes: -) the retrieval of the spent nuclear fuel from the power units and its transportation into the Interim Spent Fuel Storage Facility; -) equipment and building decontamination and dismantling; -) radioactive waste treatment and storage; and -) the operation of key systems to ensure nuclear, radiation and fire protection. Ignalina NPP decommissioning project is planned to be completed by 2038. The presentation will be focused on the ongoing decommissioning activities at Ignalina NPP. The overview of main aspects and challenges of INPP decommissioning will be provided

  1. Start up physics tests of units 5 and 6 (WWER 1000) at Kozloduy NPP by comparison with the calculated neutron physics characteristics

    International Nuclear Information System (INIS)

    Antov, A.; Stoyanova, I.

    2008-01-01

    In conjunction with each refuelling shutdown of the reactor core, nuclear design calculations are performed to ensure that the reactor physics characteristics of the new core will be consistent with the safety limits. Prior to return to normal operation, a physics test program is required to determine if the operating characteristics of the core are consistent with the design predictions and to ensure that the core can be operated as designed. Successful completion of the physics test program is demonstrated when the test results agree with the predicted results within predetermined test criteria. Successful completion of the physics test program and successful completion of other tests, which are performed after each refuelling provides assurance that the plant can be operated as designed. The calculated neutron-physics characteristics values of Kozloduy NPP Unit 5 and Unit 6 (WWER 1000) obtained by the computer code package KASKAD are compared with the obtained results during the start up physics tests. The core fuel loading consists of 163 fuel assemblies (FAs). The calculated values are given according to actual experimental conditions of the reactor core during start up physics tests. The report includes comparisons between calculation results by code package KASKAD (BIPR7A) and experimental data values of main neutron-physics characteristics during start up physics tests in selected recent cycles of Kozloduy NPP Unit 5 and Unit 6. (authors)

  2. Start up physics tests of Units 5 and 6 (WWER-1000) at Kozloduy NPP by comparison with the calculated neutron physics characteristics

    International Nuclear Information System (INIS)

    Stoyanova, I.; Antov, A.

    2007-01-01

    In conjunction with each refuelling shutdown of the reactor core, nuclear design calculations are performed to ensure that the reactor physics characteristics of the new core will be consistent with the safety limits. Prior to return to normal operation, a physics test program is required to determine if the operating characteristics of the core are consistent with the design predictions and to ensure that the core can be operated as designed. Successful completion of the physics test program is demonstrated when the test results agree with the predicted results within predetermined test criteria. Successful completion of the physics test program and successful completion of other tests which are performed after each refuelling provides assurance that the plant can be operated as designed. The calculated neutron-physics characteristics values of Kozloduy NPP Unit 5 and Unit 6 (WWER 1000) obtained by the computer code package KASKAD are compared with the obtained results during the start up physics tests. The core fuel loading consists of 163 fuel assemblies. The calculated values are given according to actual experimental conditions of the reactor core during start up physics tests. The report includes comparisons between calculation results by code package KASKAD (BIPR7A) and experimental data values of main neutron-physics characteristics during start up physics tests in selected recent cycles of Kozloduy NPP Unit 5 and Unit 6 (Authors)

  3. NPP Prevlaka - Preparation of construction

    International Nuclear Information System (INIS)

    Bojic, K.

    1984-01-01

    On the basis of study 'Optimal electricity generation structure till the year 2000' production of 3 x 500 MWe in nuclear power plants has been anticipated. Second Croatian-Slovenian NPP project will be based on the same principles the first one (NPP Krsko) was based on. Preconstruction investigation studies are performed at site Prevlaka on river Sava downstream of Zagreb. Licensing procedure has started with republic Urban countryside planning activities. Preconstruction activities are planned to be finished by the end of 1986. while the construction is expected to start during 1987. Parallel to investigation studies for NPP Prevlaka, evaluation of nuclear technology and reactor type is planned to be made. (author)

  4. Planning for decommissioning of Ignalina Nuclear Power Plant Unit-1

    International Nuclear Information System (INIS)

    Poskas, P.; Poskas, R.; Zujus, R.

    2002-01-01

    In accordance to Ignalina NPP Unit 1 Closure Law, the Government of Lithuania approved the Ignalina NPP Unit 1 Decommissioning Program until 2005. For enforcement of this program, the plan of measures for implementation of the program was prepared and approved by the Minister of Economy. The plan consists of two parts, namely technical- environmental and social-economic. Technical-environmental measures are mostly oriented to the safe management of spent nuclear fuel and operational radioactive waste stored at the plant and preparation of licensing documents for Unit 1 decommissioning. Social-economic measures are oriented to mitigate the negative social and economic impact on Lithuania, inhabitants of the region, and, particularly, on the staff of Ignalina NPP by means of creating favorable conditions for a balanced social and economic development of the region. In this paper analysis of planned radioactive waste management technologies, licensing documents for decommissioning, other technical-environmental and also social-economic measures is presented. Specific conditions in Lithuania important for defining the decommissioning strategy are highlighted. (author)

  5. Analysis of Gamma Dose Rate Caused by Corrosion Products inside the Containment Building of Yonngwang Nuclear Power Plant Unit 3 During Shutdown Period

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Wi Ho; Kim, Jae Cheon; Kim, Soon Young; Kim, Jong Kyung [Hanyang Univ., Seoul (Korea, Republic of)

    2005-07-01

    Occupational radiation exposure(ORE) of nuclear power plant(NPP) workers mainly occurs during the shutdown period. Major radioactive sources are the corrosion products released from the reactor coolant system(RCS). The corrosion products consist of circulating crud and deposited crud. Major radioactive corrosion products, {sup 58}Co and {sup 60}Co, are known to contribute approximately more than 70% of the total ORE. In this study, the corrosion products regarding cobalt were evaluated during the shutdown period, and gamma dose rates caused by them were calculated at the main working area inside the containment building of the Yonggwang NPP Unit 3.

  6. New appraisement of siting for a NPP on Mures river

    International Nuclear Information System (INIS)

    Traian Mauna

    2010-01-01

    The studies for a second NPP siting on inner Romanian rivers began in a careful manner since 1982 as a first part of the Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. The experience gained from Cernavoda NPP siting, the first mission of new multi-branch of specialists team was to choose new NPP sites adapting the CANDU type NPP Cernavoda project to the new parameters of close water cooling circuit and of hard less or no rock foundation strata. The new sites conditions mean a lot of changes of CANDU license and a decrease the output power supplied to the national electric grid. The studies on the Mures river as alternative site of Olt river in Transylvania region began in 1986 and were stopped after 1990. This paper tries to reconsider shortly the old analysis focused on geological and geotechnical aspects and other local sites characteristics according to the last IAEA Safety Standards taking into account also the last types of NPP generations and the number of units. (author)

  7. Seismic analysis of a NPP reactor building using spectrum-compatible power spectral density functions

    International Nuclear Information System (INIS)

    Venancio Filho, F.; Joia, L.A.

    1987-01-01

    A numerical methodology to obtain Power Spectral Density Functions (PSDF) of ground accelerations, compatible with a given design response spectrum is presented. The PSDF's are derived from the statistical analysis of the amplitudes of the frequency components in a set of artificially generated time-histories matching the given spectrum. A so obtained PSDF is then used in the stochastic analysis of a reactor building. The main results of this analysis are compared with the ones obtained by deterministic methods. (orig./HP)

  8. Social and psychological problems of nuclear power: perception of NPP construction and environmental risk

    International Nuclear Information System (INIS)

    Malenchenko, A.F.; Sushko, S.N.; Saltanova, I.V.; Tushin, N.N.; Kozlovskaya, A.V.; Bortnovskij, V.N.; Dorofeeva, S.M.; Gapanovich-Kajdalov, N.V.; Gapanovich-Kajdalova, E.V.

    2013-01-01

    The paper presents the analysis of questioning about perception of nuclear power plant construction in Belarus and about concomitant environmental risk. The opinion poll has been conducted among students of: Department of Environmental Monitoring of the International A. Sakharov Environmental University, Physics Department of Belarus State University, Department of General Hygienic and Environmental Medicine of Gomel State Medical University, Faculty of Mechanical Engineering of Minsk Polytechnic College. (authors)

  9. A Study on UAE Cultural Effects on Nuclear Power Plant (NPP) Operation

    International Nuclear Information System (INIS)

    Jang, In Seok; Seong, Poong Hyun; Kang, Hyun Gook

    2012-01-01

    Several initiatives have recently been taken to provide international cooperation in technology transfer and supplying human factors resources to the nuclear industry worldwide. The aim of promoting international cooperation is for the safe operation of the nuclear power industry. In terms of international cooperation of the nuclear industry, nuclear power plants are now under construction in Braka, UAE. However, with technology transfer and international cooperation, there needs to consider several potential problems due to the differences between two culture of the countries such as language, technical culture and expectation. Also, there is an evidence of remarkably wide effects of cultural interpretation of human-system interface even between what have been thought of as relatively homogeneous. Hence, the purpose of this research is to draw attention to the degree to which culture, organizational, and even ergonomic differences have to overcome, if such transfer of knowledge and behavioral technology is to be successful. Of particular interest is the UAE's cultural effect on operating nuclear power plants

  10. A Study on UAE Cultural Effects on Nuclear Power Plant (NPP) Operation

    Energy Technology Data Exchange (ETDEWEB)

    Jang, In Seok; Seong, Poong Hyun; Kang, Hyun Gook [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2012-05-15

    Several initiatives have recently been taken to provide international cooperation in technology transfer and supplying human factors resources to the nuclear industry worldwide. The aim of promoting international cooperation is for the safe operation of the nuclear power industry. In terms of international cooperation of the nuclear industry, nuclear power plants are now under construction in Braka, UAE. However, with technology transfer and international cooperation, there needs to consider several potential problems due to the differences between two culture of the countries such as language, technical culture and expectation. Also, there is an evidence of remarkably wide effects of cultural interpretation of human-system interface even between what have been thought of as relatively homogeneous. Hence, the purpose of this research is to draw attention to the degree to which culture, organizational, and even ergonomic differences have to overcome, if such transfer of knowledge and behavioral technology is to be successful. Of particular interest is the UAE's cultural effect on operating nuclear power plants

  11. Requalification of the steam supply systems of Units 3 and 4 of the Kozloduy NPP to a new model WWER-440/B-209M

    International Nuclear Information System (INIS)

    Iordanov, I.; Ourutchev, V.; Stoev, M.; Sabinov, S.

    2001-01-01

    In order to achieve significant advances in operational safety level, the project characteristics, the possibility of safety systems upgrading and operational conditions of Units 1 to 4 of the Kozloduy NPP were an object of very serious and in-depth analysis in the years 1990-2000. This systematic evaluation was initiated under the broad international concern resulted from the conclusions of IAEA missions held during 1990-1991 to assess the safety of the units. As a result of the efforts of the plant staff and many international experts the operational conditions, design safety and plant management were dramatically improved which resulted in bringing the plant to a new safety level. This review also developed such that the design safety features of Units 3 and 4 are significantly different from those units of the so-called V-230 group. The principle difference and advantages of Units 3 and 4 design were clarified and confirmed. A review process of the changed status of Units 3 and 4 safety was conducted in 1999-2000 with the help of IAEA experts and the experts of RISKAUDIT and WENRA. The process led to the conclusion that the significance of advantages of the safety level need to be encapsulated within a new safety case and the corresponding set of steps was combined as a 'Project for upgrading the Nuclear Steam Supply System of Units 3 and 4 of Kozloduy NPP to model WWER-440/B-209M'. The completion of the activities under this project is expected in 2002 following the major implementation phase during 2001/2002 units' outages. (author)

  12. The primary circuit materials properties results analysis performed on archive material used in NPP V-1 and Kola NPP Units 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Kupca, L.; Beno, P. [Nuclear Power Plants Research Institute Inc., Trnava (Slovakia)

    1997-04-01

    A very brief summary is provided of a primary circuit piping material properties analysis. The analysis was performed for the Bohunice V-1 reactor and the Kola-1 and -2 reactors. Assessment was performed on Bohunice V-1 archive materials and primary piping material cut from the Kola units after 100,000 hours of operation. Main research program tasks included analysis of mechanical properties, corrosion stability, and microstructural properties. Analysis results are not provided.

  13. Teachers Environmental Resource Unit: Energy and Power.

    Science.gov (United States)

    Bemiss, Clair W.

    Problems associated with energy production and power are studied in this teacher's guide to better understand the impact of man's energy production on the environment, how he consumes energy, and in what quantities. The resource unit is intended to provide the teacher with basic information that will aid classroom review of these problems. Topics…

  14. The 3rd power unit roofing decontamination

    International Nuclear Information System (INIS)

    Samojlenko, Yu.N.; Golubev, V.V.

    1989-01-01

    The most features of the 3rd power unit (PU) roofing decontamination are described: 1) the most active materials were thrown into the 4th PU ruins before the Ukrytie construction completion; 2) the decontamination was fulfilled using remote-controlled mechanisms and manual devices (the main part). 6 figs.; 1 tab

  15. NPP Krsko decommissioning concept

    International Nuclear Information System (INIS)

    Novsak, M.; Fink, K.; Spiler, J.

    1996-01-01

    At the end of the operational lifetime of a nuclear power plant (NPP) it is necessary to take measures for the decommissioning as stated in different international regulations and also in the national Slovenian law. Based on these requirements Slovenian authorities requested the development of a site specific decommissioning plan for the NPP KRSKO. In September 1995, the Nuklearna Elektrarna Krsko (NEK) developed a site specific scope and content for decommissioning plan including the assumptions for determination of the decommissioning costs. The NEK Decommissioning Plan contains sufficient information to fulfill decommissioning requirements identified by NRC, IAEA and OECD - NEA regulations. In this paper the activities and the results of development of NEK Decommissioning Plan consisting of the development of three decommissioning strategies for the NPP Krsko and selection of the most suitable strategy based on site specific, social, technical, radiological and economical aspects, cost estimates for the strategies including the costs for construction of final disposal facilities for fuel/high level waste (fuel/HLW) and low/intermediate level waste (LLW/ILW) and scheduling all activities necessary for the decommissioning of the NPP KRSKO are presented. (author)

  16. NPP Krsko decommissioning concept

    International Nuclear Information System (INIS)

    Novsak, M.; Fink, K.; Spiler, J.

    1996-01-01

    At the end of the operational lifetime of a nuclear power plant (NPP) it is necessary to take measures for the decommissioning as stated in different international regulations and also in the national Slovenian law. Based on these requirements Slovenian authorities requested the development of a site specific decommissioning plan for the NPP Krsko. In September 1995, the Nuklearna Elektrarna Krsko (NEK) developed a site specific scope and content for a decommissioning plan including the assumptions for determination of the decommissioning costs. The NEK Decommissioning Plan contains sufficient information to fulfill the decommissioning requirements identified by NRC, IAEA and OECD - NEA regulations. In this paper the activities and results of development of NEK Decommissioning Plan consisting of the development of three decommissioning strategies for the NPP Krsko and selection of the most suitable strategy based on site specific, social, technical, radiological and economic aspects, cost estimates for the strategies including the costs for construction of final disposal facilities for fuel/high level waste (fuel/HLW) and low/intermediate level waste (LLW/ILW) and scheduling of all activities necessary for the decommissioning of the NPP Krsko are presented. (author)

  17. The Initial Test Programme Features for the Advanced Korean NPPs (Shin–Kori NPP Units 3&4)

    International Nuclear Information System (INIS)

    Sul, Y.S.

    2015-01-01

    Korea has developed the Advanced Power Reactor 1400 (APR1400), an evolutionary pressurised water reactor and has obtained the standard design approval in 2002. As of 2014, eight nuclear power plants (NPPs) are in preparation for operation or under construction, four in Korea (SKN 3&4, SUN 1&2) and four in UAE (BNPP 1, 2, 3&4), and four NPPs are in planning in Korea (SKN 5&6, SUN 3&4). Especially, SKN Units 3&4 are the first construction NPPs for the APR1400 and are currently in the final stage to get Operating Licence (OL). The initial test programme for NPPs begins as systems and components are turned over to the startup organization and ends with completion of the Power Ascension Tests (PATs). For SKN Unit 3, the Pre-core Hot Functional Testing has been successfully completed and the initial fuel loading would proceed after getting OL. The SKN Unit 4 is preparing for the CHT (Cold Hydrostatic Test). The SKN 3&4 has many new and advanced design features and so has developed the test programmes to demonstrate that those advanced design features can be safely operated and the performance levels can be maintained in accordance with approved safety requirements. Among those test programs, the examples of test programs, newly introduced ones compared to the previous NPPs are as follows; – SIT (Safety Injection Tank) Blowdown Test with FD (Fluidic Device) – IRWST (In-Containment Refueling Water Storage Tank) In-Plant Test – POSRV (Pilot Operated Safety Relief Valve) Test – Low Power Physics Testing and PAT considering FOAK (First Of A Kind) unit – Safe Shutdown Test with DCS (Distrubuted Control System) Fail and CMF (Common Mode Failure) for Safety Instrumentation and Control System. (author)

  18. The application of gamma-spectrometry to nuclear power plant (NPP) and environment

    International Nuclear Information System (INIS)

    Asgharizadeh, Farid.

    1995-01-01

    One of measuring systems is nuclear spectrometry, particularly Gamma-Ray Spectrometry, to measure and determine the radionuclide concentration within plant materials and environmental samples. There are four major applied techniques related to Nuclear Power Plant operation and environmental monitoring aspects. Some details about gamma ray spectrometry technique is discussed in chapter 2. The main emphasis is on the calculation of gamma-ray detector efficiency for different geometries, the minimum detectable activity concepts and dead-time correction. Also,some formula and relations are introduced. In chapter 3, the major applications of gamma-ray spectrometry for analysis of nuclear power plant and environmental samples are discussed. These applications are divided into four topics: Nuclear Fuel survey; based on the activity of fission products concentration in reactor coolant, two other applications are introduced: Fuel Burnup calculation and the calculation of rated activity of natural radionuclides in construction of materials which is the last and most important application: Measurement and determination of radionuclides activity concentr[[[[n in environmental samples is described through section 3.3 Sampling and measuring methods for research and monitoring aspects is evaluated. Some data about sample preparation methods such as pretreatment and solubilization procedures are presented. Quantitative chemical separations of trace constituents from complex sample materials invariably require meticulous work by an analytical chemist. The radiochemical separation deals with this subject. Instrumental aspects, relate to gamma-ray spectrometry, quality assurance, presentation and reporting of results are described. In the experimental part, determination of radionuclides concentration in sediment sample is presented

  19. Operation Aspect of the Main Control Room of NPP

    International Nuclear Information System (INIS)

    Sahala M Lumbanraja

    2009-01-01

    The main control room of Nuclear Power Plant (NPP) is operational centre to control all of the operation activity of NPP. NPP must be operated carefully and safely. Many aspect that contributed to operation of NPP, such as man power whose operated, technology type used, ergonomic of main control room, operational management, etc. The disturbances of communication in control room must be anticipated so the high availability of NPP can be achieved. The ergonomic of the NPP control room that will be used in Indonesia must be designed suitable to anthropometric of Indonesia society. (author)

  20. Development of new process network for gas chromatograph and analyzers connected with SCADA system and Digital Control Computers at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Deneanu, Cornel; Popa Nemoiu, Dragos; Nica, Dana; Bucur, Cosmin

    2007-01-01

    The continuous monitoring of gas mixture concentrations (deuterium/ hydrogen/oxygen/nitrogen) accumulated in 'Moderator Cover Gas', 'Liquid Control Zone' and 'Heat Transport D 2 O Storage Tank Cover Gas', as well as the continuous monitoring of Heavy Water into Light Water concentration in 'Boilers Steam', 'Boilers Blown Down', 'Moderator heat exchangers', and 'Recirculated Water System', sensing any leaks of Cernavoda NPP U1 led to requirement of developing a new process network for gas chromatograph and analyzers connected to the SCADA system and Digital Control Computers of Cernavoda NPP Unit 1. In 2005 it was designed and implemented the process network for gas chromatograph which connected the gas chromatograph equipment to the SCADA system and Digital Control Computers of the Cernavoda NPP Unit 1. Later this process network for gas chromatograph has been extended to connect the AE13 and AE14 Fourier Transform Infrared (FTIR) analyzers with either. The Gas Chromatograph equipment measures with best accuracy the mixture gases (deuterium/ hydrogen/oxygen/nitrogen) concentration. The Fourier Transform Infrared (FTIR) AE13 and AE14 Analyzers measure the Heavy Water into Light Water concentration in Boilers Steam, Boilers BlownDown, Moderator heat exchangers, and Recirculated Water System, monitoring and signaling any leaks. The Gas Chromatograph equipment and Fourier Transform Infrared (FTIR) AE13 and AE14 Analyzers use the new OPC (Object Link Embedded for Process Control) technologies available in ABB's VistaNet network for interoperability with automation equipment. This new process network has interconnected the ABB chromatograph and Fourier Transform Infrared analyzers with plant Digital Control Computers using new technology. The result was an increased reliability and capability for inspection and improved system safety

  1. Optimal replacement and inspection periods of safety and control boards in Wolsung nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Mok, Jin Il

    1993-02-01

    In nuclear power plants, the safety and control systems are important for operating and maintaining safety of nuclear power plants. Due to the failure of the instrument and control devices of nuclear power plants caused by aging, nuclear power plants occasionally trip. Since the start of first commercial operation of Kori nuclear power plant (NPP) unit 1, the trips caused by instrument and control systems account for 28% of total trips of NPPs in Korea. Even a single trip of a nuclear power plant causes an extravagant economical loss and deteriorates public acceptance of nuclear power plants. Therefore, the replacement of the instrument and control devices with proper consideration of the aging effect is necessary in order to prevent the inadvertent trip. In this work we investigated the optimal replacement periods of the digital control computer's (DCC) and the programmable digital comparator's (PDC) electronic circuit boards of Wolsung nuclear power plant Unit 1. We first derived mathematical models which calculate optimal replacement periods for electronic circuit boards of digital control computer (DCC) and for those of the programmable digital comparator (PDC) in Wolsung NPP unit 1. And we analytically obtained the optimal replacement periods of electronic circuit boards by using these models. We compared these periods with the replacement periods currently used at Wolsung NPP Unit. The periods used at Wolsung is not based on mathematical analysis, but on empirical knowledge. As a consequence, the optimal replacement periods analytically obtained for the electronic circuit boards of DCC and those used in the field shown small difference : the optimal replacement periods analytically obtained for the electronic circuit boards of PDC are shorter than those used in the field in general. The engineered safeguards of Wolsung nuclear power plant unit 1 contains redundant systems of 2-out-of-3 logic which are not operating under normal conditions but they are called

  2. Main features of buildings and structures important to safety of units V1 and V2 of Bohunice NPP

    International Nuclear Information System (INIS)

    David, M.

    1993-01-01

    The program of seismic upgrading of Bohunice NPPs has been started in the year 1989 (after finishing of new seismic input). Since that time the seismic upgrading of Main building of NPP V1 has already been realized, structural as well as technological parts. Beside that the designs of seismic upgrading of other structures of NPP V1 and V2 have been completed. It has been proved that the seismic upgrading of NPPs with reactors WWER 440 is very complicated, but still possible, even in the case with high seismic intensity. It would be not possible to fulfill this complicated task without the help of IAEA Missions. The activities of IAEA experts in the program of Bohunice NPPs upgrading are appreciated very much

  3. Control units for APS power supplies

    International Nuclear Information System (INIS)

    Despe, O.D.; Saunders, C.; McGhee, D.G.

    1993-01-01

    The Advanced Photon Source (APS) accelerator facility is made up of five major subsystems in addition to the linac: the positron accumulator ring (PAR), low energy transport (LET), booster synchrotron (SYNCH), high energy transport (HET), the storage ring (SR). Each subsystem has multiple magnet power supply combinations, some requiring multiple of operation. These magnet and power supply combinations computer controlled and monitored. The power supply control unit (PSCU) is the first layer of hardware and software above the power supply itself and is described in this paper. The description includes the basic philosophy for each of operation and how it influences the topology and of implementing control. The design of the analog reference blocks (ARBs) influenced the design of other custom functions well as the feedback controls for vibration and other dynamic corrections. The command set supported by the PSCU is discussed

  4. Modeling of the fatigue damage accumulation processes in the material of NPP design units under thermomechanical unstationary effects. Estimation of spent life and forecast of residual life

    International Nuclear Information System (INIS)

    Kiriushin, A.I.; Korotkikh, Yu.G.; Gorodov, G.F.

    2002-01-01

    Full text: The estimation problems of spent life and forecast of residual life of NPP equipment design units, operated at unstationary thermal force loads are considered. These loads are, as a rule, unregular and cause rotation of main stress tensor platforms of the most loaded zones of structural elements and viscoelastic plastic deformation of material in the places of stresses concentrations. The existing engineering approaches to the damages accumulation processes calculation in the material of structural units, their advantages and disadvantages are analyzed. For the processes of fatigue damages accumulation a model is proposed, which allows to take into account the unregular pattern of deformation multiaxiality of stressed state, rotation of main platforms, non-linear summation of damages at the loading mode change. The model in based on the equations of damaged medium mechanics, including the equations of viscoplastic deformation of the material and evolutionary equations of damages accumulation. The algorithms of spent life estimation and residual life forecast of the controlled equipment and systems zones are made on the bases of the given model by the known real history of loading, which is determined by real model of NPP operation. The results of numerical experiments on the basis of given model for various processes of thermal force loads and their comparison with experimental results are presented. (author)

  5. A flowsheet for a wave power unit

    Energy Technology Data Exchange (ETDEWEB)

    Sobierajski, E.; Kasperowicz, Z.

    1984-01-01

    A flowsheet is examined for a wave power unit designed to produce electricity, for flooding or drying a coastal zone, cleaning or protecting water areas of ports from sand deposits. The unit includes a vertical cylinder attached to the sea floor with input and output water ducts and valves. The cylinder has a rod with piston that is actuated through a flexible cable by float arranged next to the cylinder. The water injected under pressure into the pressure pipe can be used directly or as an intermediate energy source.

  6. Electrical Grid Conditioning For First NPP Integration, a Systems Engineering Approach Incorporating Quality Function Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Pwani, Henry; James, J. [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    Nuclear power plant has a high potential to cause serious harm to environment as evidenced by effects of Fukushima and Chernobyl accidents. A reliable electrical power is required for a NPP to facilitate cooling after a shutdown. Failure of electrical power supply during shutdown increases core damage probability. Research shows that a total of 39% of LOOP related events in US are electrical grid centered. In Korea, 38% and 29% of all events that led to NPP shutdown at Hanul units 3-6 and at Hanbit units 3-6 respectively were electrical related. Electric grids for both operating and new NPPs must therefore be examined and upgraded for reliability improvement in order to enhance NPP safety.

  7. Assessment of the radionuclide composition of "hot particles" sampled in the Chernobyl nuclear power plant fourth reactor unit.

    Science.gov (United States)

    Bondarkov, Mikhail D; Zheltonozhsky, Viktor A; Zheltonozhskaya, Maryna V; Kulich, Nadezhda V; Maksimenko, Andrey M; Farfán, Eduardo B; Jannik, G Timothy; Marra, James C

    2011-10-01

    Fuel-containing materials sampled from within the Chernobyl Nuclear Power Plant (ChNPP) Unit 4 Confinement Shelter were spectroscopically studied for gamma and alpha content. Isotopic ratios for cesium, europium, plutonium, americium, and curium were identified, and the fuel burn-up in these samples was determined. A systematic deviation in the burn-up values based on the cesium isotopes in comparison with other radionuclides was observed. The studies conducted were the first ever performed to demonstrate the presence of significant quantities of 242Cm and 243Cm. It was determined that there was a systematic underestimation of activities of transuranic radionuclides in fuel samples from inside of the ChNPP Confinement Shelter, starting from 241Am (and going higher) in comparison with the theoretical calculations.

  8. Development and application of the lancing system of delta-60 steam generator-Kori nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Jeong, W. T.; Han, D. Y.; Ahn, N. S.; Jo, B. H.; Hong, Y. W.

    2001-01-01

    A lancing system for removing the deposits on the tube sheet of a nuclear steam generator using high pressure water was developed and applied to Kori Nuclear Power Plant( NPP) Unit 1. As the place where the lancing system is to be installed is relatively high radioactive area, every part consisting the equipment is carefully selected to be radiation resistant. The lancing robot was designed to be water proof to aviod possible malfunction of the lancing robot because of high pressure water. To minimize radiation exposure to operators, the system was designed considering easy installation and maintenance in mind. Water ejection nozzle are designed to have high strength with special material and heat treatment so as to lessen abrasion caused by high pressure ejection. The lancing system showed good performance during the on-site lancing using the system for Delta-60 steam generator of Kori NPP No. 1 in October 2000

  9. The Chernobyl NPP decommissioning: Current status and alternatives

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Steinberg, N.

    1996-01-01

    After the Chernobyl accident of April 26, 1986, many contradictory decisions were taken concerning the Chernobyl nuclear power plant (NPP) future. The principal source of contradictions was a deadline for a final shutdown of the Chernobyl NPP units. Alterations in a political and socioeconomic environment resulted in the latest decision of the Ukrainian Authorities about 2000 as a deadline for a beginning of the Chernobyl NPP decommissioning. The date seems a sound compromise among the parties concerned. However, in order to meet the data a lot of work should be done. First of all, a decommissioning strategy has to be established. The problem is complicated due to both site-specific aspects and an absence of proven solutions for the RBMK-type reactor decommissioning. In the paper the problem of decommissioning option selection is considered taking into account an influence of the following factors: relevant legislative and regulatory requirements; resources required to carry out decommissioning (man-power, equipment, technologies, waste management infrastructure, etc.); radiological and physical status of the plant, including structural integrity and predictable age and weather effects; impact of planned activities at the destroyed unit 4 and within the 30-km exclusion zone of the Chernobyl NPP; planed use of the site; socio-economic considerations

  10. On the prohibition of automatic redundant power supply of 6 and 0.4 kV auxiliary sections at Leningrad NPP

    International Nuclear Information System (INIS)

    Mokeev, S.F.

    1987-01-01

    At Leningrad NPP the automatic switching on of the auxiliary power supply sources of 6 and 0.4 kV is prohibited to provide personnel safety and preserve destruction of electroequipment. With excess of current maximum value in the 6 kV section immediate detachment of all electric motors occurs. At that moment by the switchers detechment emergency signal it occurs immediate swithing on of auxiliary systems or emergency switching on of auxiliary supply of the main circulating pumps, that insreases abruptly operation reliability of plant technological department

  11. Software development for simplified performance tests and weekly performance check in Younggwang NPP Unit 3 and 4

    International Nuclear Information System (INIS)

    Hur, K. Y.; Jang, S. H.; Lee, J. W.; Kim, J. T.; Park, J. C.

    2002-01-01

    This paper covers the current status of turbine cycle performance test in nuclear power plants and the software development which can solve some shortcomings related to performance tests. The software developed is for simplified performance tests and weekly performance checks in Yonggwang nuclear power plant unit 3 and 4. This software includes the requirements from the efficiency division for the consistency with actual performance analysis work and the usability of the collected performance test data. From the working survey, we identify the difference between the embedded performance analysis modules and the actual performance analysis work. This software helps operation or maintenance personnel to reduce work load, to support the trend analysis of essential parameters in a turbine cycle, and to utilize the correction curves for the decision-making in their work

  12. The supply model of the IandC system modernization at VVER 1000 units of the NPP Temelin

    International Nuclear Information System (INIS)

    Tomicek, L.

    1997-01-01

    The history of the instrumentation and control system of the Temelin nuclear power plant is briefly mentioned. An upgrading of this system was initiated, aimed at enhancement of nuclear safety and at increasing the economical effectiveness of electricity production. The final supplier of the new system is SKODA PRAHA, the Westinghouse Electric Co. being the sub-supplier. By modernization of the IandC system, conditions have been created for an up-to-date WWER-1000 type unit which copes with the current requirements on nuclear safety and operating economy. (A.K.)

  13. Chernobyl NPP accident: a year later

    International Nuclear Information System (INIS)

    Asmolov, V.G.; Borovoj, A.A.; Demin, V.F.

    1988-01-01

    Consideration is being given to measures on liquidation of Chernobyl accident aftereffects, conducted since August, 1986. One of the most important measures lay in construction of the ''shelter'', which must provide long-term conservation of accidental unit. Works on decontamination of reactor area and contaminated populated regions were continued. Measures on providing safety of population and its health protection were performed. An attention was paid to long-term investigations on studying delayed aftereffects of the accident, monitoring of invironment, development and introduction of measures on improving NPP safety. Prospects of further development of nuclear power engeneering and possibilities of improving its safety are considered

  14. Part-task simulator of a WWER-440 type nuclear power plant unit

    International Nuclear Information System (INIS)

    Palecek, P.

    1990-01-01

    In the present paper the design of a part-task simulator for WWER-440 type nuclear power plant units by the CEZ (Czech Power Works) Concern is reported. This part-task simulator has been designed for the training of NPP operating personnel. It includes a central computer that is coupled with the training work places and the trainer place. Interchange of information is performed by functional keyboards and semigraphical colour displays. The process is simulated, also in real time scale, on the basis of dynamic models. In addition to the precision of the models used, great importance has primarily been attached to plasticity of information presentation. The part-task simulator may be applied to simulation and demonstration as well as to teaching purposes. The paper presents the achieved state of implementation of the part-task simulator and points out some further stage of evolution. (author)

  15. Cernavoda NPP environmental management system - tool for managing the impact on the environment

    International Nuclear Information System (INIS)

    Gabriel, B.; Adrian, J.

    2009-01-01

    Nuclearelectrica SA (SNN SA) is a state owned company which produces nuclear-generated electricity, heat and CANDU 6 type nuclear fuel. The company has also an active participation in the power development program in Romania. The Cernavovoda NPP, one of the SNN branches is situated at 180 km east of Bucharest, in Constanta County at about 2 km SE from Cernavoda town is a CANDU 6 type. Cernavoda Nuclear Power Plant (NPP) is dedicated to generate electrical and thermal power, safely and efficiently for at least 30 years. Having an annual gross output of 5.2 - 5.4 MWh, the Cernavoda Unit 1 NPP provides 10% of the Romanian electric power production. Starting January 01 2007, the Cernavoda Unit 1 NPP supplied into the grid 5518346 MWh electric power and during 1997 - 2007 the Cernavoda Unit 1 NPP supplied into the grid 55769213 MWh electric powers. Over the same period Unit 1 also provided the partial district heating of the town of the Cernavoda supplying about 601517.9 Gcal. Romania second CANDU nuclear power plant, Cernavoda Unit 2, was officially placed in service on Friday, October 5, 2007 together with Unit 1, the CNE-Cernavoda Station is the largest power producer in the country. It now accounts for about 18 per cent of Romania energy supply and significantly reduces its dependency on expensive energy resources from outside of Europe. It provides a structured approach to planning and implementing environmental protection measures. It also establishes a framework for tracking, evaluating and communicating environmental performance. SNN SA mission is to operate the Cernavoda NPP - in a competitive, safe and environmental friendly manner so that the production is optimized and the economic life time of the plant is as long as possible. One major accomplishment is the achievement of ISO 14001 certification for our Environmental Management System (EMS) at Cernavoda NPP. The aim of this paper is to present the EMS implemented and to emphasize the outcomes of the

  16. New approach of second Romanian NPP siting

    International Nuclear Information System (INIS)

    Mauna, Traian

    2010-01-01

    The NPP sitting studies in Romania began before 1975. The first Romanian NPP CANDU 6 type reactor gone to erection in 1980 on Cernavoda site planned to have 5 units. Gained the experience from Cernavoda NPP sitting, the first mission of new multi-branch of specialists team was to choose new NPP sites adapting the NPP Cernavoda project to the new parameters of close water cooling circuit and hard less and no rock foundation strata. The studies were carrying out in different stages on the inner rivers Olt, Mures, Somes in Transylvania historical region. This paper tries to reconsider shortly the old analysis according to the last IAEA Safety Standards, taking into account the new NPP generation requirement. Paper is focused on geological aspects and other local sites characteristics. (authors)

  17. Nuclear power in the South Korea

    International Nuclear Information System (INIS)

    Molodtsov, S.D.

    1988-01-01

    Data on the state of nuclear power in the South Korea are presented. In the end of 1987 7 power units with 5380 MW total power were in operation in the South Korea. The share of NPP capacity was equal to 26% of the total electric power plant capacity of the country. The cost of NPP power production was equal to 2.2 cent (kw.h). The total established NPP capacity should achieve 7.3 GW by 1990, and exceed 9 GW by 2000

  18. Chernobyl NPP accident. Overcoming experience. Acquired lessons

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Vasil'chenko, V.N.; Klyuchnikov, A.A.; Prister, B.S.

    2006-01-01

    This book is devoted to the 20 anniversary of accident on the Chernobyl NPP unit 4. History of construction, causes of the accident and its consequences, actions for its mitigation are described. Modern situation with Chernobyl NPP decommissioning and transferring of 'Ukryttya' shelter into ecologically safe system are mentioned. The future of Chernobyl site and exclusion zone was discussed

  19. Design studies on staffing requirements for the new generation nuclear power units of WWER-640 and BN-800 reactor types

    International Nuclear Information System (INIS)

    Solovyov, D.F.

    2001-01-01

    The paper outlines the main staffing requirements for the new generation power units with nuclear reactors. These requirements were developed taking into account IAEA recommendations. NPP staffing structure is described, including the main and auxiliary personnel. The main principles of personnel number determination are given. Special attention is taken to the issues of personnel skill and training, including both theoretical education and practical work on the power units in operation. The use of simulators, system of knowledge control and structure of training are considered. ''Shopless'' staffing structure approach is proposed for the NPP, assuming that the main scope of repair work is performed by the central repair organization, thus increasing the quality of repair and decreasing the number of personnel on the plant. Data are given on the personnel number for the WWER-640 and the BN-800 reactor designs. Specialists of the ''ATOMENERGOPROJECT'' Institute started their work on staffing on the early development stage of the basic design of WWER-640 reactor power unit which is the forerunner of the new generation reactors. This work was based on the approaches taken by the chief engineers of NPPs in operation during their meeting held in 1989 in Kalinin NPP. At this meeting definite decision was taken on changing over to involving manufacturer in the repair work of NPP components using manufacturer's technology. In 1992 the meeting of representatives of suppliers of the main components was held where representatives of ''ATOMENERGOREMONT'' and ''LENENERGOREMONT'' were present. The suppliers agreed on carrying out repair works on the components they produced. For this purpose special departments were set up having some experience. This repair work is already carried out by ''ATOMENERGOREMONT'' on some nuclear power plants. ''LENENERGOREMONT'' has gained considerable experience in this kind of repair work on the turbines of LO-1 and LO-2 NPP in Finland. Within the

  20. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 4F. Paks NPP: Analysis and testing. Working material

    International Nuclear Information System (INIS)

    1999-01-01

    In August 1991, following the SMiRT-11 Conference in Tokyo, a Technical Committee Meeting was held on the 'Seismic safety issues relating to existing NPPs'. The Proceedings of this TCM was subsequently compiled in an IAEA Working Material. One of the main recommendations of this TCM, called for the harmonization of criteria and methods used in Member States in seismic reassessment and upgrading of existing NPPs. Twenty four institutions from thirteen countries participated in the CRP named 'Benchmark study for the seismic analysis and testing of WWER type NPPs'. Two types of WWER reactors (WWER-1000 and WWER-440/213) selected for benchmarking. Kozloduy NPP Units 5/6 and Paks NPP represented these respectively as prototypes. Consistent with the recommendations of the TCM and the working paper prepared by the subsequent Consultants' Meeting, the focal activity of the CRP was the benchmarking exercises. A similar methodology was followed both for Paks NPP and Kozloduy NPP Unit 5. Firstly, the NPP (mainly the reactor building) was tested using a blast loading generated by a series of explosions from buried TNT charges. Records from this test were obtained at several free field locations (both downhole and surface), foundation mat, various elevations of structures as well as some tanks and the stack. Then the benchmark participants were provided with structural drawings, soil data and the free field record of the blast experiment. Their task was to make a blind prediction of the response at preselected locations. The analytical results from these participants were then compared with the results from the test. Although the benchmarking exercises constituted the focus of the CRP, there were many other interesting problems related to the seismic safety of WWER type NPPs which were addressed by the participants. These involved generic studies, i.e. codes and standards used in original WWER designs and their comparison with current international practice; seismic analysis

  1. WIMS-IST/DRAGON-IST side-step calculation of reactivity device and structural material incremental cross sections for Wolsong NPP Unit 1

    International Nuclear Information System (INIS)

    Dahmani, M.; McArthur, R.; Kim, B.G.; Kim, S.M.; Seo, H.-B.

    2008-01-01

    This paper describes the calculation of two-group incremental cross sections for all of the reactivity devices and incore structural materials for an RFSP-IST full-core model of Wolsong NPP Unit 1, in support of the conversion of the reference plant model to two energy groups. This is of particular interest since the calculation used the new standard 'side-step' approach, which is a three-dimensional supercell method that employs the Industry Standard Toolset (IST) codes DRAGON-IST and WIMS-IST with the ENDF/B-VI nuclear data library. In this technique, the macroscopic cross sections for the fuel regions and the device material specifications are first generated using the lattice code WIMS-IST with 89 energy groups. DRAGON-IST then uses this data with a standard supercell modelling approach for the three-dimensional calculations. Incremental cross sections are calculated for the stainless-steel adjuster rods (SS-ADJ), the liquid zone control units (LZCU), the shutoff rods (SOR), the mechanical control absorbers (MCA) and various structural materials, such as guide tubes, springs, locators, brackets, adjuster cables and support bars and the moderator inlet nozzle deflectors. Isotopic compositions of the Zircaloy-2, stainless steel and Inconel X-750 alloys in these items are derived from Wolsong NPP Unit 1 history dockets. Their geometrical layouts are based on applicable design drawings. Mid-burnup fuel with no moderator poison was assumed. The incremental cross sections and key aspects of the modelling are summarized in this paper. (author)

  2. Constructive approaches to the space NPP designing

    International Nuclear Information System (INIS)

    Eremin, A.G.; Korobkov, L.S.; Matveev, A.V.; Trukhanov, Yu.L.; Pyshko, A.P.

    2000-01-01

    An example of designing a space NPP intended for power supply of telecommunication satellite is considered. It is shown that the designing approach based on the introduction of a leading criterion and dividing the design problems in two independent groups (reactor with radiation shield and equipment module) permits to develop the optimal design of a space NPP [ru

  3. Radioactive wastes management of NPP

    International Nuclear Information System (INIS)

    Klyuchnikov, A.A.; Pazukhin, Eh.M.; Shigera, Yu. M.; Shigera, V.Yu.

    2005-01-01

    Modern knowledge in the field of radiation waste management on example of the most serious man-made accident at Chernobyl NPP are illuminated. This nuclear power plant that after accident in 1986 became in definite aspect an experimental scientific ground, includes all variety of problems which have to be solved by NPP personnel and specialists from scientific organizations. This book is aimed for large sphere of readers. It will be useful for students, engineers, specialists and those working in the field of nuclear power, ionizing source and radiation technology use for acquiring modern experience in nuclear material management

  4. NPP Krsko secondary side analysis

    International Nuclear Information System (INIS)

    Fabijan, Lj.

    1987-01-01

    The purpose of this work is to analyze secondary side thermohydraulics response on steam generator tube plugging in order to ensure nominal NPP power. We had established that the additional opening of the governing valve No. 3 and 4 can compensate pressure drop caused by steam generator tube plugging. Two main steam flows with four governing valves were simulated. Steam expansion in turbine and feed water system was modeled separately. All important process point and steam moisture changes impact on nominal NPP power were analysed. (author)

  5. NPP financial and regulatory risks-Importance of a balanced and comprehensive nuclear law for a newcomer country considering nuclear power programme

    Science.gov (United States)

    Manan, J. A. N. Abd; Mostafa, N. A.; Salim, M. F.

    2015-04-01

    The nature of Nuclear Power Plant (NPP) projects are: long duration (10-15 years for new build), high capital investment, reasonable risks and highly regulated industries to meet national & international requirement on Safety, Security, Safeguards (3S) and Liabilities. It requires long term planning and commitment from siting to final disposal of waste/spent fuel. Potential financial and regulatory risks are common in massive NPP projects and will be magnified in the case of using unproven technology. If the risks are not properly managed, it can lead to high project and operation costs, and, fail to fulfil its objectives to provide compatible electricity prices and. energy security. To ensure successful, the government and investors need to ensure that the NPP project is bankable with low cost of project and funding, have fair treatment and proper risk mitigation, and able to complete on time with no cost overrun. One of the requirements as prerequisite for the development of NPP as stipulated by the International Atomic Energy Agency (IAEA) is the establishment of a Legal and Regulatory Framework. The main objective of nuclear law is to ensure that the activities and projects carried-out in the country are legal and compliant to national and international requirements. The law should also be able to provide fair treatment of risks on its activities that is acceptable to investors. The challenge for a newcomer country is to develop a balanced and comprehensive national nuclear law that meet these objectives while taking into consideration various stakeholders' interest without compromising on safety, security, safeguard, liability requirements and other international obligations. This paper highlights the nature of NPP projects, its potential and associated financial and regulatory risks, and its major concerns and challenges. It proposes possible risks treatment and mitigation through the formulation of a balanced and comprehensive legislation by clear

  6. NPP financial and regulatory risks-Importance of a balanced and comprehensive nuclear law for a newcomer country considering nuclear power programme

    International Nuclear Information System (INIS)

    Manan, J. A. N. Abd; Mostafa, N. A.; Salim, M. F.

    2015-01-01

    The nature of Nuclear Power Plant (NPP) projects are: long duration (10-15 years for new build), high capital investment, reasonable risks and highly regulated industries to meet national and international requirement on Safety, Security, Safeguards (3S) and Liabilities. It requires long term planning and commitment from siting to final disposal of waste/spent fuel. Potential financial and regulatory risks are common in massive NPP projects and will be magnified in the case of using unproven technology. If the risks are not properly managed, it can lead to high project and operation costs, and, fail to fulfil its objectives to provide compatible electricity prices and. energy security. To ensure successful, the government and investors need to ensure that the NPP project is bankable with low cost of project and funding, have fair treatment and proper risk mitigation, and able to complete on time with no cost overrun. One of the requirements as prerequisite for the development of NPP as stipulated by the International Atomic Energy Agency (IAEA) is the establishment of a Legal and Regulatory Framework. The main objective of nuclear law is to ensure that the activities and projects carried-out in the country are legal and compliant to national and international requirements. The law should also be able to provide fair treatment of risks on its activities that is acceptable to investors. The challenge for a newcomer country is to develop a balanced and comprehensive national nuclear law that meet these objectives while taking into consideration various stakeholders’ interest without compromising on safety, security, safeguard, liability requirements and other international obligations. This paper highlights the nature of NPP projects, its potential and associated financial and regulatory risks, and its major concerns and challenges. It proposes possible risks treatment and mitigation through the formulation of a balanced and comprehensive legislation by clear

  7. NPP financial and regulatory risks-Importance of a balanced and comprehensive nuclear law for a newcomer country considering nuclear power programme

    Energy Technology Data Exchange (ETDEWEB)

    Manan, J. A. N. Abd, E-mail: jamalan@tnb.com.my; Mostafa, N. A.; Salim, M. F. [Nuclear Energy Department, Planning Division, Tenaga Nasional Berhad Level 32, Dua Sentral, No. 8 Jalan Tun Sambanthan, 50470 Brickfields, Kuala Lumpur (Malaysia)

    2015-04-29

    The nature of Nuclear Power Plant (NPP) projects are: long duration (10-15 years for new build), high capital investment, reasonable risks and highly regulated industries to meet national and international requirement on Safety, Security, Safeguards (3S) and Liabilities. It requires long term planning and commitment from siting to final disposal of waste/spent fuel. Potential financial and regulatory risks are common in massive NPP projects and will be magnified in the case of using unproven technology. If the risks are not properly managed, it can lead to high project and operation costs, and, fail to fulfil its objectives to provide compatible electricity prices and. energy security. To ensure successful, the government and investors need to ensure that the NPP project is bankable with low cost of project and funding, have fair treatment and proper risk mitigation, and able to complete on time with no cost overrun. One of the requirements as prerequisite for the development of NPP as stipulated by the International Atomic Energy Agency (IAEA) is the establishment of a Legal and Regulatory Framework. The main objective of nuclear law is to ensure that the activities and projects carried-out in the country are legal and compliant to national and international requirements. The law should also be able to provide fair treatment of risks on its activities that is acceptable to investors. The challenge for a newcomer country is to develop a balanced and comprehensive national nuclear law that meet these objectives while taking into consideration various stakeholders’ interest without compromising on safety, security, safeguard, liability requirements and other international obligations. This paper highlights the nature of NPP projects, its potential and associated financial and regulatory risks, and its major concerns and challenges. It proposes possible risks treatment and mitigation through the formulation of a balanced and comprehensive legislation by clear

  8. Strengthening the control on radioactive sources - Cernavoda NPP operating experience

    International Nuclear Information System (INIS)

    Daian, I.; Simionov, V.

    2005-01-01

    This paper presents the national legal frame governing the radioactive source management, legislative requirements introduced during last years and current status of controlled radioactive sources program at Cernavoda NPP. Romania has only one nuclear power plant, Cernavoda NPP, equipped with five PHWR - CANDU-6 Canadian type reactors - with a 700 MW(e) gross capacity each, in different implementation stages. The legal representative of the nuclear power production sector in Romania is 'Nuclearelectrica' S.A. National Company (SNN). SNN is a governmental company controlled by the Ministry of Industry and Trade. The company has headquarters in Bucharest and three subsidiaries: - CNE-PROD Cernavoda (CNE-PROD), operating the Cernavoda NPP - Unit 1; - CNE-INVEST Cernavoda, in charge with the completion of Unit 2 and with the preservation of Units 3,4,5; - Nuclear Fuel Plant in Pitesti (FCN). Unit 1 is in commercial operation since December 2, 1996, Unit 2 is under construction (80% completed) and Units 3, 4, 5 are under preservation. The operation of Cernavoda NPP implies use of radioactive sources that may present a significant risk to health, property and the environment when control is lost. Within the last years CNCAN issued new regulations stating clear responsibilities for the different institutions involved in radioactive materials control programs. To manage radioactive sources in a safe way CNE-PROD established and revised the Controlled Radioactive Sources Program, as part of Station Radiation Protection Regulation, ensuring strict recording of the radioactive sources and their usage, ensuring physical and radiological security, protecting the personnel, members of the public and the environment from the hazards of ionizing radiation during the life cycle of the plant, including decommissioning. (authors)

  9. Strengthening the control on radioactive sources - Cernavoda NPP operating experience

    International Nuclear Information System (INIS)

    Daian, I.; Simionov, V.

    2005-01-01

    Full text: This paper presents the national legal frame governing the radioactive source management, legislative requirements introduced during last years and current status of controlled radioactive sources program at Cernavoda NPP. Romania has only one nuclear power plant, Cernavoda NPP, equipped with five PHWR - CANDU-6 Canadian type reactors - with a 700 MW(e) gross capacity each, in different implementation stages. The legal representative of the nuclear power production sector in Romania is 'Nuclearelectrica' S.A. National Company (SNN). SNN is a governmental company controlled by the Ministry of Industry and Trade. The company has headquarters in Bucharest and three subsidiaries: - CNE-PROD Cernavoda (CNE-PROD), operating the Cernavoda NPP - Unit 1; - CNE-INVEST Cernavoda, in charge with the completion of Unit 2 and with the preservation of Units 3,4,5; - Nuclear Fuel Plant in Pitesti (FCN). Unit 1 is in commercial operation since December 2, 1996, Unit 2 is under construction (80% completed) and Units 3, 4, 5 are under preservation. The operation of Cernavoda NPP implies use of radioactive sources that may present a significant risk to health, property and the environment when control is lost. Within the last years CNCAN issued new regulations stating clear responsibilities for the different institutions involved in radioactive materials control programs. To manage radioactive sources in a safe way CNE-PROD established and revised the Controlled Radioactive Sources Program, as part of Station Radiation Protection Regulation, ensuring strict recording of the radioactive sources and their usage, ensuring physical and radiological security, protecting the personnel, members of the public and the environment from the hazards of ionizing radiation during the life cycle of the plant. (authors)

  10. On the results of nuclear fuel temperature dynamics restoration at the Chornobyl NPP unit 4 during active phase of the accident

    Directory of Open Access Journals (Sweden)

    O. V. Mikhailov

    2016-02-01

    Full Text Available Fuel temperature dynamics was reconstructed for active phase of the accident at the Chernobyl NPP Unit 4. Method of effective temperature calculation for uranium oxide is based on implementation of the CORSOR type mathematical codes and the model of lava-like fuel containing materials (LFCM formation from fragments of the former core (FFC in the room 305/2. Calculations were carried out according to release rate of 131I and 137Cs radionuclides during the period from April 26 until May 6, 1986. The rate of temperature drop during the FCM stage cooling bath silicate melt was estimated. It is shown that the main streams of LFCM could be formed at more moderate values of temperatures than it was performed previously. The results of the work are used to verify the “blast furnace” version of LFCM formation and formation of FCM with high uranium concentration.

  11. Research on the NPP human factors engineering operating experience review

    International Nuclear Information System (INIS)

    Ren Xiangchen; Miao Hongxing; Ning Zhonghe

    2006-01-01

    This paper addresses the importance of the human factors engineering (HFE) for the design of nuclear power plant (NPP), especially for the design of human-machine interface in the NPP. It also summarizes the scope and content of the NPP HFE. The function, scope, content and process of the NPP human factors engineering operating experience review (OER) are mainly focused on, and significantly discussed. Finally, it briefly introduces the situation of the studies on the OER in China. (authors)

  12. Low level radioactive waste disposal in Kozloduy NPP in Bulgaria

    International Nuclear Information System (INIS)

    Stanchev, V.

    2001-01-01

    Kozloduy NPP is the biggest power plant in the Republic of Bulgaria. It is in operation since 1974 and for the past 25 years it has generated over 263 billion kWh electric power. The NPP share in the total electric production in 1998 was about 50%. It has six units in operation - four WWER 440 B-230 and two WWER 1000 B-320. In the nuclear reactor operation the generation of radioactive waste (RAW) is an inevitable process. The waste must be conditioned, stored and disposed of in a safe manner. There are no national radioactive waste disposal facilities, for waste generated by an NPP, in Bulgaria to the moment. This situation necessitates the storage of operational RAW to be carried out on site for a long period of time (30 to 50 years). Following the principle for protection of human health and environment now and in the future, Kozloduy NPP adopted the concept for conditioning the RAW to a stable solid form and placing the waste in a package which should keep its features for a sufficiently long term so that the package can be safely transported to the disposal site. (author)

  13. Reliability analysis of protection systems in NPP applying fault-tree analysis method

    International Nuclear Information System (INIS)

    Bokor, J.; Gaspar, P.; Hetthessy, J.; Szabo, G.

    1998-01-01

    This paper demonstrates the applicability and limits of dependability analysis in nuclear power plants (NPPS) based on the reactor protection refurbishment project (RRP) in NPP Paks. This paper illustrates case studies from the reliability analysis for NPP Paks. It also investigates the solutions for the connection between the data acquisition and subsystem control units (TSs) and the voter units (VTs), it analyzes the influence of the voting in the VT computer level, it studies the effects of the testing procedures to the dependability parameters. (author)

  14. Determining permissible PT parameters in normal operating conditions for reactor pressure vessel of units 1-4 of NPP Kozloduy

    International Nuclear Information System (INIS)

    Batischev, M.; Yurukov, V.; Simovski, Ts.

    2000-01-01

    The main objective of the analysis is to verify the determined from the Main Designer P-T curves and to provide that permissible T values can be decreased even in case a lot of very conservative assumptions are taken into account. Detailed temperature and stress distributions are obtained using different 3D Finite Element Models. Then, assuming linear elastic behaviour and using these distributions onto models including cracks K I values are determined. From the K I values taking into account material characteristics and actual and prognostic neutron fluence of the most sensitive areas of the RPV, P-T curves are determined. Residual stresses in welds are also taken into account. Analysis has been performed independently following two different methodologies - one prescribed by Russian norms (PNAEh-G-7-002-86) and another, developed by the IAEA - 'Guidelines on PTS analysis for WWER NPP'. The obtained results using two methodologies are compared and the more severe are determined

  15. 21 CFR 890.5950 - Powered heating unit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Powered heating unit. 890.5950 Section 890.5950...) MEDICAL DEVICES PHYSICAL MEDICINE DEVICES Physical Medicine Therapeutic Devices § 890.5950 Powered heating unit. (a) Identification. A powered heating unit is a device intended for medical purposes that...

  16. 14 CFR 23.1142 - Auxiliary power unit controls.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Auxiliary power unit controls. 23.1142... Powerplant Controls and Accessories § 23.1142 Auxiliary power unit controls. Means must be provided on the... power unit. [Doc. No. 26344, 58 FR 18974, Apr. 9, 1993] ...

  17. Concreting organization during Chernobylsk NPP construction

    International Nuclear Information System (INIS)

    Lysyuk, R.I.; Kareva, A.P.

    1984-01-01

    Conreting organization during the Chernobylsk NPP construction is described. Processes of extra heavy concrete production and placement, which specific mass constitutes 4t/m 3 at the age of 28 days wiath metallic aggregates and 3.3-3.5 t/m 3 at the same age without aggregates, are considered in short. Basic characteristics of this concrete are presented. At the 4th power unit labour contents for construction works were a 1.5 times lower as compared to the 3rd power unit erection. This progress was achieved by round-the-clock operation of the concrete plant with the 800 m 3 /day output and also by utilization of special equipment for mechanized concrete placement: concrete pumps, automatic concrete mixer, manipulators and concrete pipelines

  18. Characteristics of organizational culture at the maintenance units of two Nordic nuclear power plants

    International Nuclear Information System (INIS)

    Reiman, Teemu; Oedewald, Pia; Rollenhagen, Carl

    2005-01-01

    This study aims to characterize and assess the organizational cultures of two Nordic nuclear power plant (NPP) maintenance units. The research consisted of NPP maintenance units of Forsmark (Sweden) and Olkiluoto (Finland). The study strives to anticipate the consequences of the current practices, conceptions and assumptions in the given organizations to their ability and willingness to fulfill the organizational core task. The methods utilized in the study were organizational culture and core task questionnaire (CULTURE02) and semi-structured interviews. Similarities and differences in the perceived organizational values, conceptions of one's own work, conceptions of the demands of the maintenance task and organizational practices at the maintenance units were explored. The maintenance units at Olkiluoto and Forsmark had quite different organizational cultures, but they also shared a set of dimensions such as strong personal emphasis placed on safety. The authors propose that different cultural features and organizational practices may be equally effective from the perspective of the core task. The results show that due to the complexity of the maintenance work, the case organizations tend to emphasize some aspects of the maintenance task more than others. The reliability consequences of these cultural solutions to the maintenance task are discussed. The authors propose that the organizational core task, in this case the maintenance task, should be clear for all the workers. The results give implications that this has been a challenge recently as the maintenance work has been changing. The concepts of organizational core task and organizational culture could be useful as management tools to anticipate the consequences of organizational changes

  19. Experience with Periodic Safety Review (PSR) at Kozloduy NPP after 20 years of operation

    International Nuclear Information System (INIS)

    Popov, V.

    2011-01-01

    Conclusion: Measures in the long-term Programs for improving safety and radiation protection of unit 5&6, based on PSR outcome and addressed on the units’ operation licence renewal are under way. • NPP Kozloduy intends to fulfils requirements on modern nuclear power plants which occasionally exceeds limits of the effective national nuclear legislation

  20. Vertical Migration of Radionuclides in Soils on the Chernobyl Nuclear Power Plant (ChNPP) Exclusion Zone (1987-2007)

    Science.gov (United States)

    Jannik, G. T.; Ivanov, Y. A.; Kashparov, V. A.; Levchuk, S. E.; Bondarkov, M. D.; Maksymenko, A. M.; Farfan, E. B.; Marra, J. C.

    2009-12-01

    In 1986-1987, a set of experimental sites for studies of vertical migration of radionuclides released from the ChNPP was established in the ChNPP Exclusion Zone for various fallout plumes. The sites were selected considering local terrain and geo-chemical conditions, as well as physical and chemical characteristics of the fallout. The experimental sites included grasslands, and pre-Chernobyl cultivated meadows and croplands. Vertical migration of radionuclides in the ChNPP Exclusion Zone grasslands was evaluated. Parameters of 137Cs, 90Sr, and 239,240Pu transfer were calculated and the periods during which these radionuclides reach their ecological half-life in the upper 5 cm soil layer were estimated. Migration capabilities of these radionuclides in the grassland soils tend to decrease as follows: 90Sr >137Cs ≥ 239,240Pu. A significant retardation of the 137Cs vertical migration was shown in the grasslands long after the Chernobyl accident. During the 21st year after the fallout, average Tecol values for 137Cs (the period of time it takes in the environment for 137Cs to reach half the value of its original concentration in the upper 5 cm soil layer, regardless of physical decay) are as follows: 180 - 320 years for grassland containing automorphous mineral soils of a light granulometric composition; and 90 - 100 years for grassland containing hydromorphous organogenic soils. These values are significantly higher than those estimated for the period of 6-9 years after the fallout: 60 - 150 years and 11 - 20 years, respectively. The absolute 137Cs Tecol values are by factors of 3-7 higher than 137Cs radiological decay values long after the accident. Changes in the exposure dose resulting from the soil deposited 137Cs only depend on its radiological decay. This factor should necessarily be considered for development of predictive assessments, including dose exposures for the hypothetical population in case of their re-evacuation to the exclusion areas. The obtained

  1. Nuclear power plant V-1

    International Nuclear Information System (INIS)

    1998-01-01

    The nuclear power plant Bohunice V -1 is briefly described. This NPP consists from two reactor units. Their main time characteristics are (Reactor Unit 1, Reactor Unit 2): beginning of construction - 24 April 1972; first controlled reactor power - 27 November 1978, 15 March 1980; connection to the grid - 17 December 1978, 26 March 1980; commercial operation - 1 April 1980, 7 January 1981. This leaflet contains: NPP V-1 construction; Major technological equipment (Primary circuit: Nuclear reactor [WWER 440 V230 type reactor];Steam generator; Reactor Coolant Pumps; Primary Circuit Auxiliary Systems. Secondary circuit: Turbine generators, Nuclear power plant electrical equipment; power plant control) and technical data

  2. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 4C. Paks NPP: Analysis and testing. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    The Co-ordinated research programme on the benchmark study for the seismic analysis and testing of WWER-type nuclear power plants was initiated subsequent to the request from representatives of Member States. The conclusions adopted at the Technical Committee Meeting on Seismic Issues related to existing nuclear power plants held in Tokyo in 1991 called for the harmonization of methods and criteria used in Member States in issues related to seismic safety. The Consulltants' Meeting which followed resulted in producing a working document for CRP. It was decided that a benchmark study is the most effective way to achieve the principal objective. Two types of WWER reactors (WWER-440/213 and WWER-1000) were selected as prototypes for the benchmark exercise to be tested on a full scale using explosions and/or vibration generators. The two prototypes are Kozloduy Units 5/6 for WWER-1000 and Paks for WWER-440/213 nuclear power plants. This volume of Working material involves comparative analysis of the seismic analysis results of the reactor building for soft soil conditions, derivation of design response spectra for components and systems; and upper range design response spectra for soft soil site conditions at Paks NPP.

  3. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 4C. Paks NPP: Analysis and testing. Working material

    International Nuclear Information System (INIS)

    1996-01-01

    The Co-ordinated research programme on the benchmark study for the seismic analysis and testing of WWER-type nuclear power plants was initiated subsequent to the request from representatives of Member States. The conclusions adopted at the Technical Committee Meeting on Seismic Issues related to existing nuclear power plants held in Tokyo in 1991 called for the harmonization of methods and criteria used in Member States in issues related to seismic safety. The Consulltants' Meeting which followed resulted in producing a working document for CRP. It was decided that a benchmark study is the most effective way to achieve the principal objective. Two types of WWER reactors (WWER-440/213 and WWER-1000) were selected as prototypes for the benchmark exercise to be tested on a full scale using explosions and/or vibration generators. The two prototypes are Kozloduy Units 5/6 for WWER-1000 and Paks for WWER-440/213 nuclear power plants. This volume of Working material involves comparative analysis of the seismic analysis results of the reactor building for soft soil conditions, derivation of design response spectra for components and systems; and upper range design response spectra for soft soil site conditions at Paks NPP

  4. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 4D. Paks NPP: Analysis and testing. Working material

    International Nuclear Information System (INIS)

    1996-01-01

    The Co-ordinated research programme on the benchmark study for the seismic analysis and testing of WWER-type nuclear power plants was initiated subsequent to the request from representatives of Member States. The conclusions adopted at the Technical Committee Meeting on Seismic Issues related to existing nuclear power plants held in Tokyo in 1991 called for the harmonization of methods and criteria used in Member States in issues related to seismic safety. The Consulltants' Meeting which followed resulted in producing a working document for CRP. It was decided that a benchmark study is the most effective way to achieve the principal objective. Two types of WWER reactors (WWER-440/213 and WWER-1000) were selected as prototypes for the benchmark exercise to be tested on a full scale using explosions and/or vibration generators. The two prototypes are Kozloduy Units 5/6 for WWER-1000 and Paks for WWER-440/213 nuclear power plants. This volume of Working material contains reports on seismic margin assessment and earthquake experience based methods for WWER-440/213 type NPPs; structural analysis and site inspection for site requalification; structural response of Paks NPP reactor building; analysis and testing of model worm type tanks on shaking table; vibration test of a worm tank model; evaluation of potential hazard for operating WWER control rods under seismic excitation

  5. Polish media and public opinion on NPP Mochovce commissioning

    International Nuclear Information System (INIS)

    Latek, Stanislaw

    1999-01-01

    The so called 'Mochovce Problem' was one of the major topics in Polish media in the period from May to July 1998. The nuclear power plant commissioning caused an unexpectedly strong reaction, especially in the newspapers, slightly less so in electronic media. Faced with clearly hostile media reaction to Mochovce NPP, the National Atomic Energy Agency representatives, together with atomic and nuclear experts, undertook to change these attitudes. In numerous interviews, letters to the editors and talks with journalists, they attempted to correct the mistakes, explain the true safety situation in the nuclear power plant, by whom it was constructed, who supervised and tested the systems and so on. The completion of Mochovce NPP construction improved significantly the electricity balance in Slovakia, thus decreasing the pressure for continuing the operation of older Bohunice V1 units beyond their design lifetime. For this reason, as well as in view of striving for improvement in environmental factors beyond Polish southern border, especially after Kyoto/97 decisions on greenhouse gases emissions, the public opinion in Poland should support the Mochovce NPP construction. In 1996 Poland has signed with Slovakia a bilateral inter-governmental agreement on the prompt notification on nuclear accidents and on the cooperation in the nuclear safety and radiological protection matters. On the basis of this agreement the experts from Polish National Atomic Energy Agency are in perpetual contact with Slovakian Nuclear Regulatory Body and in each and every moment can obtain full and comprehensive information on the plant parameters iportant for nuclear safety. The experts explanations, together with the NAEA top management visit to the plant itself, brought some results. The media became less aggressive, and Polish public and authorities - contrary to the Austrians - do not protest loudly against the commissioning of this newest European NPP. Now, in December 1998, the tune of

  6. Qualification of NPP operations personnel

    International Nuclear Information System (INIS)

    Wang Jiao.

    1987-01-01

    Competence of personnel is one of the important problems for safety operation of nuclear power plant. This paper gives a description of some aspects, such as the administration of NPP, posts, competence of personnel, training, assessing the competence and personnel management

  7. Safety analysis on Non-LOCA events for the revision of Wolsong NPP unit 2,3,4 sar

    International Nuclear Information System (INIS)

    Kim, Jong Hyun; Jin, Dong Sik; Ryu, Eui Seung; Kho, Dong Wook; Kim, Sung Min

    2015-01-01

    Korean Wolsong Nuclear Power Plant Units 2,3,4 (CANDU-6 Type) has prepared the revision of safety analysis report (Final Safety Analysis Report (FSAR) chapter 15) from the original performed in the year of 1990s, using the updated and state-of-the-art methodology and tools including IST safety analysis codes and more detail modelling. Compared with the original FSAR15, the revised FSAR15 has significant improvement in both the scope and the depth of safety analysis, which has demonstrated the safety analysis results have complied with the safety requirements(acceptance criteria). This paper will present the analysis scope for Non-LOCA events re-analyzed or added for the FSAR15 revision, methodologies applied such as codes and modelling and some important analysis results will be demonstrated with comparison to acceptance criteria. Application of more detail and near-realistic assumptions and method including Dev-PDO options and uncertainty related to the CHF correlations has altogether brought about more safety margin compared with the original FSAR15 with respect to SDS trip effectiveness etc. (author)

  8. Conceptual basic and status of nuclear power plant decommissioning effort in the Russian Federation

    International Nuclear Information System (INIS)

    Glazounov, V.; Khamyanov, L.

    1998-01-01

    Decommissioning of nuclear power plants, although a usual phase in nuclear facility life cycle still has significant peculiarities due to radioactive contamination of NPP equipment and structural elements. This paper deals with the phases in decommissioning process, as follows: NPP shutdown, meaning end of commercial operation; NPP unit mothballing, radiation review of the unit to justify particular concept of decommissioning; extended hold-up, which means maintaining of contaminated equipment in the isolated zone under radiologically safe conditions; unit dismantling and burial. Status of NPP decommissioning effort in Russia is described

  9. Auxiliary power unit for moving a vehicle

    Science.gov (United States)

    Akasam, Sivaprasad [Peoria, IL; Johnson, Kris W [Peoria, IL; Johnson, Matthew D [Peoria, IL; Slone, Larry M [Washington, IL; Welter, James Milton [Chillicothe, IL

    2009-02-03

    A power system is provided having at least one traction device and a primary power source configured to power the at least one traction device. In addition, the power system includes an auxiliary power source also configured to power the at least one traction device.

  10. Arrangement and statistics of storage containers of spent fuel for assemblies of the SFP of NPP-L V, Unit 1

    International Nuclear Information System (INIS)

    Mijangos D, Z. E.; Vargas A, A. F.; Amador C, C.

    2014-10-01

    This work presents the determination of assemblies of the spent fuel pool (SFP) of the nuclear power plant of Laguna Verde (NPP-L V) which are candidates to be assigned to storage containers of independent spent fuel, with the objective of liberating decay heat and to have more space in the SFP, for the store of retired assemblies of the reactors in future reloads of NPP-L V, besides that the removed assemblies of the SFP should be stored in specific containers to guarantee the physical safety of them, as well as the radiological protection to the population and the environment. The design of the containers considered in this work is to store a maximum of 69 assemblies; it has a thermal capacity of 26 kilowatts and allows storing assemblies with a minimum of 5 years of have been extracted of the reactor core. Is considered that in 2016 start the storage of the spent assemblies on the containers, the candidates assemblies to store cover from the first reload in 1991, until the assemblies deposited in the SFP in the 14 reload in 2010; therefore in 2016, such assemblies will have fulfilled with the criteria of 5 years of have been removed of the Reactor, also the 69 assemblies assigned to each container will have a resulting decay heat that does not exceed the thermal capacity of the container, but that in great percentage approximates to the same one, and this way to take full advantage of their storage capacity and thermal capacity for each container. This work also contains the arrangement to accommodate the assemblies in the containers; such arrangement is constituted by areas according to the decay heat of each assembly. (Author)

  11. Decommissioning of NPP A-1

    International Nuclear Information System (INIS)

    Anon

    2009-01-01

    In this presentation the Operation history of A1 NPP, Project 'Decommissioning of A1 NPP' - I stage, Project 'Decommissioning of A1 NPP ' - II stage and Next stages of Project 'Decommissioning of A1 NPP ' are discussed.

  12. Spain in South Ukraine NPP

    International Nuclear Information System (INIS)

    Ibanez, M.

    1994-01-01

    A Technical Assistance Protocol was signed between the Governments of the GIS and the Commission of the European Union (CEU) on August 2, 1991 and this was the starting point of the TACIS program. In this article, the activities described are those related to the TACIS-92/93/94 on site technical assistance to South Ukraine NPP (SUK NPP). Within the scope of the TACIS 92 Program the CEU and the Ukrainian Authorities agreed a list of projects to be implemented at South Ukraine NPP with the aim to improve the operational safety of the plant. This part of the program is called TACIS 92 on-site activities. The total budget allocated to these projects is a MECU. The European Union ''utility'' selected to lead this program at South Ukraine NPP was UNESA and the first contract to cover our activities was signed in July 1993 between the CEU (Mr. Pablo Benavides) and UNESA (Mr. Pedro Rivero). The projects will be implemented at SUK NPP but according to the contract UNESA is ''The Consultant'' and GOSKOMATON (The Ukrainian Sate Committee on Nuclear Power Utilization) is the ''Recipient Institution''. (Author)

  13. The ultimate emergency measures to secure a NPP under an accidental condition with no designed power or water supply

    Energy Technology Data Exchange (ETDEWEB)

    Liang, K.S., E-mail: ksliang@alum.mit.edu [Institute of Nuclear Engineering and Science, National Tsing Hua University, 101 Sec. 2, Kuang-Fu Road, Hsinchu 30013, Taiwan (China); School of Nuclear Science and Engineering, Shanghai Jiao Tong University, 800 Dong-Chuan Road, Shanghai (China); Chiang, S.C. [Department of Nuclear Safety, Taiwan Power Company, 242 Sec. 3, Roosevelt Road, Taipei 10016, Taiwan (China); Hsu, Y.F.; Young, H.J.; Pei, B.S. [Institute of Nuclear Engineering and Science, National Tsing Hua University, 101 Sec. 2, Kuang-Fu Road, Hsinchu 30013, Taiwan (China); Wang, L.C. [Department of Nuclear Safety, Taiwan Power Company, 242 Sec. 3, Roosevelt Road, Taipei 10016, Taiwan (China)

    2012-12-15

    Highlights: Black-Right-Pointing-Pointer An ultimate measure to secure core was developed, if power or water supply cannot be restored in time. Black-Right-Pointing-Pointer This ultimate measure was simulated by RELAP5-3D to verify the concept of this emergency plan. Black-Right-Pointing-Pointer Quantification of the required raw water injection rate was performed for NPPS in Taiwan Black-Right-Pointing-Pointer Reactor controlled depressurization within the 1st hour is essential to reduce the required raw water injection rate. Black-Right-Pointing-Pointer For PWR, even heat sink can be developed, RCP seal leak might eventually cause core uncover 10 h after seal leak occurs. - Abstract: In the recent nuclear catastrophe which occurred in Japan on March 11, 2011, several units of Fukushima conventional BWR experienced a total loss of power and water supply triggered by a heavy earthquake and a following Tsunami beyond design basis. In Fukushima accident it was observed that sea water was injected into reactors only after hydrogen explosion took place and it was considered a little too late to prevent core from damage. With regard to this fact, the Taiwan power company develops an ultimate measure to prevent reactor from encountering core damage, if either designed AC power or reactor water supply cannot be restored in time. This ultimate measure was named as DIVing plan, abbreviated from system depressurization, water injection and containment venting. Once any designed AC power or reactor water supply is made available, this DIVing plan will be activated to (1) depressurize reactor first, (2) inject any available water into reactor by any available power supply if this critical status cannot be restored in time, and (3) vent the containment if necessary to maintain containment integrity. In this paper the DIVing plan was simulated by RELAP5-3D to verify the concept of it and also to quantify the required raw water injection rate to prevent core from damage for both

  14. The ultimate emergency measures to secure a NPP under an accidental condition with no designed power or water supply

    International Nuclear Information System (INIS)

    Liang, K.S.; Chiang, S.C.; Hsu, Y.F.; Young, H.J.; Pei, B.S.; Wang, L.C.

    2012-01-01

    Highlights: ► An ultimate measure to secure core was developed, if power or water supply cannot be restored in time. ► This ultimate measure was simulated by RELAP5-3D to verify the concept of this emergency plan. ► Quantification of the required raw water injection rate was performed for NPPS in Taiwan ► Reactor controlled depressurization within the 1st hour is essential to reduce the required raw water injection rate. ► For PWR, even heat sink can be developed, RCP seal leak might eventually cause core uncover 10 h after seal leak occurs. - Abstract: In the recent nuclear catastrophe which occurred in Japan on March 11, 2011, several units of Fukushima conventional BWR experienced a total loss of power and water supply triggered by a heavy earthquake and a following Tsunami beyond design basis. In Fukushima accident it was observed that sea water was injected into reactors only after hydrogen explosion took place and it was considered a little too late to prevent core from damage. With regard to this fact, the Taiwan power company develops an ultimate measure to prevent reactor from encountering core damage, if either designed AC power or reactor water supply cannot be restored in time. This ultimate measure was named as DIVing plan, abbreviated from system depressurization, water injection and containment venting. Once any designed AC power or reactor water supply is made available, this DIVing plan will be activated to (1) depressurize reactor first, (2) inject any available water into reactor by any available power supply if this critical status cannot be restored in time, and (3) vent the containment if necessary to maintain containment integrity. In this paper the DIVing plan was simulated by RELAP5-3D to verify the concept of it and also to quantify the required raw water injection rate to prevent core from damage for both PWR and BWR plants in Taiwan, after the loss of passive cooling mechanism. Provided the passive cooling mechanism is lost

  15. Lessons learnt from the resin release into the primary circuit of the Fessenheim NPP unit 1 in January 2004. Impact on the nuclear safety

    International Nuclear Information System (INIS)

    Georgescu, M.

    2004-01-01

    On January the 24 th , at the Fessenheim NPP unit 1, a human error was committed during a boron demineralizer line-up, caused by lack of preparation. Consequently, a quantity of resin estimated at about 300 liters was released from this demineralizer, through its safety valve, into the head-tank of the chemical and volume control (CVC) system and after that, into the primary circuit. The incident had a real impact on the unit: the CVC filters were clogged, the seal injection flow of the primary circuit main pumps was lost, the primary circuit main pump 2 tripped four days after the incident, as the rate of the recirculated seal leak flow (downstream the seal 1) increased up to the automatic trip set point, the shaft of the running primary circuit feed pump was found seized into the rear hydrostatic bearing following the pump stop (after ten days of successful operation), the thimble plugs were jammed into their guide tubes, the small diameter pipes were plugged. The unit shutdown for over five months was necessary to clean the primary circuit components, repair or replace the affected equipment items and carry out inspections and tests. The reinforced unit in-service monitoring program, set up during the unit start-up, confirms that, up to now, the unit operation has not been adversely affected by the residual amounts of resin which subsist in certain areas of the primary circuit. Nevertheless, it remains to verify that, in the long term, these deposits will have no negative chemical effect in the potential confined areas, such as the thermal barriers of the primary circuit main pumps. Finally, the occurrence of this incident underlines, once more, the importance of normal operating activity preparing and checking. It also reveals the implementation of an ''unforgiving'' design change allowing the installation of a boron demineralizer safety valve having its outlet connected to the primary circuit. (orig.)

  16. Safety culture at Mochovce NPP

    International Nuclear Information System (INIS)

    Markus, Jozef; Feik, Karol

    2002-01-01

    This article presents the approach of Mochovce NPP to the Safety culture. It presents activities, which have been taken by Mochovce NPP up to date in the area of Safety culture enhancement with the aim of getting the term into the subconscious of each employee, and thus minimising the human factor impact on occurrence of operational events in all safety areas. The article furthermore presents the most essential information on how the elements characterising a continuous progress in reaching the planned Safety culture goals of the company management have been implemented at Mochovce NPP, as well as the management's efforts to get among the best nuclear power plant operators in this area and to be an example for the others. (author)

  17. Random power series in the unit ball of Cn

    International Nuclear Information System (INIS)

    Shi Jihuai.

    1989-07-01

    The random power series in the unit disc has been studied by many authors. In this paper, we studied the random power series in the unit ball of C n and generalized some results in the unit disc to the unit ball, in particular, the result obtained recently by Duren has been generalized to the unit ball. The main tool used here is the generalized Salem-Zygmund's theorem. (author). 12 refs

  18. Brief review of 1995 events at Ukraine's NPPs. Report on the ChNPP unit 1 of November 27.1995 ''strict regime area premises contamination after reactor refuelling''

    International Nuclear Information System (INIS)

    Lomakin, V.

    1996-01-01

    In 1995 number of events at NPP had considerably decreased as compared with that for previous 1992-94, amounted in 87. In particular, as compared with 1994, events number had decreased by 36%. It characterizes a total improvement of current NPPs safety level during 1995. The most events number as recalculated per single unit was at the South Ukraine NPP - 8. The least - at the ChNPP - 4 in total, and 1,3 per unit. Decreasing of a total events number for 1995 did also accordingly reduce other quantitative system indices which reflect state of NPPs safety level. Among event root causes, as it was before, ''administrative management deficiencies'' and ''staff training deficiencies'' are still dominanting. ''Human factor'' issues are still pending for NPPs safety, despite of considerable efforts applied to improved efficiency of correcting measures aimed at their solution. Of sufficient importance for events system development in 1995 was the work implemented at the SSTC NRS/NRA as regards preparation of modern edition of the ''Regulation on order of NPP events investigation and account''. The IAEA/Nuclear Safety Division rendered a sufficient assistance for this work to be done through arrangement of advisory help to Ukrainian specialists from international experts. 2 figs, 8 diagrams

  19. Flora sampling in the vicinity of gamma greenhouse: As a flora sampling model for supporting the national nuclear power program (NPP)

    International Nuclear Information System (INIS)

    Affrida Abu Hassan; Zaiton Ahmad; Ros Anita Ahmad Ramli; Shakinah Salleh; Norazlina Noordin; Salmah Moosa; Sakinah Ariffin; Salahbiah Abdul Majid; Nur Humaira Lau Abdullah; Mohd Zaidan Kandar; Abdul Rahim Harun

    2012-01-01

    Gamma Green House was used as a model to study radiation effects on flora and ecosystems in supporting the National Nuclear Power Programme (NPP). A task force was formed in BAB which consists of 3 main groups of flora, fauna and microorganisms. For the flora group, two sampling expeditions have been carried out on July 7, 2011 and March 2, 2012 with the assistant of experts from University Putra Malaysia. From these expeditions, a preliminary data on the types and distribution of plants in selected quadrants close to the Gamma Greenhouse has been successfully observed and the collected plant samples have been preserved as part of the herbarium collection. This paper will describe on the sampling activities and sample preservation. Knowledge gained from this study will be very useful as model for flora distribution baseline data at plant site(author)

  20. Implementation of the II. Stage decommissioning of A1 NPP

    International Nuclear Information System (INIS)

    Ficher, T.

    2015-01-01

    Presentation is focused on the implementation of the II. stage decommissioning of A1 NPP. Introductory part focuses on brief characteristics of the power plant with a history of operation, basic technical parameters and actions that were made after operation. The next section describes the basic schedule for decommissioning, structure of management and implementation of the II. stage decommissioning of the A1 NPP and objectives of the individual stages. The last and largest part of the presentation is devoted to detailed description of the II. stage decommissioning of the A1 NPP, its individual tasks and verbal and visual description of the activities that were performed. Presented is decommissioning of the technology and construction of external objects NPP A1 including storage tanks for liquid RAW, next are presented activities carried out in the Main Production Unit - decommissioning of non-operating technologies in various places/rooms, management of waste arising from these activities, treatment of case of A1 long-term spent fuel storage and long-term spent fuel storage. The subsequent section is devoted to the management and handling of contaminated soil, concrete and construction waste, including management of VLLW. (authors)

  1. Experience in connecting the power generating units of thermal power plants to automatic secondary frequency regulation within the united power system of Russia

    International Nuclear Information System (INIS)

    Zhukov, A. V.; Komarov, A. N.; Safronov, A. N.; Barsukov, I. V.

    2009-01-01

    The principles of central control of the power generating units of thermal power plants by automatic secondary frequency and active power overcurrent regulation systems, and the algorithms for interactions between automatic power control systems for the power production units in thermal power plants and centralized systems for automatic frequency and power regulation, are discussed. The order of switching the power generating units of thermal power plants over to control by a centralized system for automatic frequency and power regulation and by the Central Coordinating System for automatic frequency and power regulation is presented. The results of full-scale system tests of the control of power generating units of the Kirishskaya, Stavropol, and Perm GRES (State Regional Electric Power Plants) by the Central Coordinating System for automatic frequency and power regulation at the United Power System of Russia on September 23-25, 2008, are reported.

  2. Training human resource for NPP in Vietnam

    International Nuclear Information System (INIS)

    Nguyen, Trung Tinh; Dam, Xuan Hiep

    2008-01-01

    Vietnam will establish the first NPP in the near future. With us the first important thing is the human resource, but now there is no university in Vietnam training nuclear engineers. In EPU (Electric Power University), now we are preparing for training nuclear engineers. In this paper, we review the nuclear man power and the way to train the high quality human resource for NPP and for other nuclear application in Vietnam. (author)

  3. Pilot Operation of Ex-core Neutron Sensors of Divers Shutdown System (DSS) Unit 2 Ignalina NPP

    International Nuclear Information System (INIS)

    Jakshtonis, Z.; Krivoshei, G.

    2006-01-01

    The Ignalina Safety Assessment, which was completed in December 1996, recommended the installation of a diverse shutdown system on the 2nd unit at Ignalina. During the PPR-2004 in the DSS project are created two independent shutdown systems by separating the absorber rods into two independent groups as follows: 1. One system (designated AZ) consists of the existing 24 BAZ rods and 49 AZ/BSM rods that together are used for reliable reactor shutdown (including Control and Protection System (CPS) circuit voiding accident). This system performs the emergency protection function. 2. The other system (designated BSM) comprises the remaining absorber rods and the 49 AZ/BSM rods. Thus 49 AZ/BSM rods are actuated from AZ initiating equipment as well as from BSM initiating equipment. The BSM system performs the normal reactor shutdown function and is able to ensure long-term maintenance of the reactor in the sub-critical state. Along with implementation of DSS was modernized existing Emergency Process Protection System, which was divided into two independent Sets of initiating equipment. The DSS is independent and diverse initiating equipment from the existing 1st Set equipment; with each set having its own independent in-core and ex-core sensors for measurement of neutron flux and process parameters. The 2nd Set of initiating equipment for measuring ex-core neutron flux, was modernized with new design of 4 Ex-Core detectors each have a single low level neutron flux detector and two high range neutron detectors. They are comprising: 1. A fission chamber which operates in pulse mode to cover the low flux levels. 2. A compensated ionisation chamber in current mode to operate at high flux level. This detector is doubled to give a measurement of the axial deviation. Two detectors are enough to produce the axial power deviation. The results of testing and analysis of pilot operation of ex-core neutron sensors of DSS will be shown on the Report. (author)

  4. A program package connected with a communication network for accident statistics of NPP, TPP, HPP and the power lines

    International Nuclear Information System (INIS)

    Madjarova, A.

    1993-01-01

    The package is designed for registration and analysis of accidents according to users' needs. A possibility is also provided for easy data transfer and access to data on implemented decisions. Special programmes are developed for NPP, TPP, HPP, electricity supply branch, regional distribution management and the National Electric Company. The system is open for local network connection and file exchange between the workstations. The dialogue features are user-friendly. The emergency situations are classified according to the requirements of the enacted in Bulgaria 'Regulations for Investigation, Classification and Recording of Accidents in Electric and Thermal Stations and Networks, 1993'. The unified data input provides a possibility for insertion of additional texts (remarks), correcting and updating. Data security tools are also envisaged. (author)

  5. Seismic qualification tests of fans of the NPP of Laguna Verde U-1 and U-2

    International Nuclear Information System (INIS)

    Jarvio C, G.; Garcia H, E. E.; Arguelles F, R.; Vela H, A.; Naranjo U, J. L.

    2013-10-01

    This work presents the results of the seismic qualification tests applied to the fans that will be installed in the control panels of the three divisions of the diesel generators of the nuclear power plant (NPP) of Laguna Verde, Unit-1 and Unit-2. This seismic qualification process of the fans was carried out using two specimens that were tested in the seismic table (vibrating) of the Engineering Institute of Universidad Nacional Autonoma de Mexico (UNAM), in accordance with the requirements of the standard IEEE 344-1975, to satisfy the established requirements of seismic qualification in the technical specifications and normative documents required by the nuclear standards, in order to demonstrate its application in the diesel generators Divisions I, II and III of the NPP. The seismic qualification tests were developed on specimens that were retired of the NPP of Laguna Verde recently with a service life of 7.75 years. (Author)

  6. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 4E. Paks NPP: Analysis and testing. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    In August 1991, following the SMiRT-11 Conference in Tokyo, a Technical Committee Meeting was held on the 'Seismic safety issues relating to existing NPPs'. The Proceedings of this TCM was subsequently compiled in an IAEA Working Material. One of the main recommendations of this TCM, called for the harmonization of criteria and methods used in Member States in seismic reassessment and upgrading of existing NPPs. Twenty four institutions from thirteen countries participated in the CRP named 'Benchmark study for the seismic analysis and testing of WWER type NPPs'. Two types of WWER reactors (WWER-1000 and WWER-440/213) selected for benchmarking. Kozloduy NPP Units 5/6 and Paks NPP represented these respectively as prototypes. Consistent with the recommendations of the TCM and the working paper prepared by the subsequent Consultants' Meeting, the focal activity of the CRP was the benchmarking exercises. A similar methodology was followed both for Paks NPP and Kozloduy NPP Unit 5. Firstly, the NPP (mainly the reactor building) was tested using a blast loading generated by a series of explosions from buried TNT charges. Records from this test were obtained at several free field locations (both downhole and surface), foundation mat, various elevations of structures as well as some tanks and the stack. Then the benchmark participants were provided with structural drawings, soil data and the free field record of the blast experiment. Their task was to make a blind prediction of the response at preselected locations. The analytical results from these participants were then compared with the results from the test. Although the benchmarking exercises constituted the focus of the CRP, there were many other interesting problems related to the seismic safety of WWER type NPPs which were addressed by the participants. These involved generic studies, i.e. codes and standards used in original WWER designs and their comparison with current international practice; seismic analysis

  7. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 4E. Paks NPP: Analysis and testing. Working material

    International Nuclear Information System (INIS)

    1995-01-01

    In August 1991, following the SMiRT-11 Conference in Tokyo, a Technical Committee Meeting was held on the 'Seismic safety issues relating to existing NPPs'. The Proceedings of this TCM was subsequently compiled in an IAEA Working Material. One of the main recommendations of this TCM, called for the harmonization of criteria and methods used in Member States in seismic reassessment and upgrading of existing NPPs. Twenty four institutions from thirteen countries participated in the CRP named 'Benchmark study for the seismic analysis and testing of WWER type NPPs'. Two types of WWER reactors (WWER-1000 and WWER-440/213) selected for benchmarking. Kozloduy NPP Units 5/6 and Paks NPP represented these respectively as prototypes. Consistent with the recommendations of the TCM and the working paper prepared by the subsequent Consultants' Meeting, the focal activity of the CRP was the benchmarking exercises. A similar methodology was followed both for Paks NPP and Kozloduy NPP Unit 5. Firstly, the NPP (mainly the reactor building) was tested using a blast loading generated by a series of explosions from buried TNT charges. Records from this test were obtained at several free field locations (both downhole and surface), foundation mat, various elevations of structures as well as some tanks and the stack. Then the benchmark participants were provided with structural drawings, soil data and the free field record of the blast experiment. Their task was to make a blind prediction of the response at preselected locations. The analytical results from these participants were then compared with the results from the test. Although the benchmarking exercises constituted the focus of the CRP, there were many other interesting problems related to the seismic safety of WWER type NPPs which were addressed by the participants. These involved generic studies, i.e. codes and standards used in original WWER designs and their comparison with current international practice; seismic analysis

  8. Mochovce NPP simulator

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    Mochovce NPP simulator basic features and detailed description of its characteristics are presented with its performance, certification and application for training of NPP operators as well as the training scenario

  9. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 4G. Paks NPP: Analysis and testing. Working material

    International Nuclear Information System (INIS)

    1999-01-01

    In August 1991, following the SMiRT-11 Conference in Tokyo, a Technical Committee Meeting was held on the 'Seismic safety issues relating to existing NPPs'. The Proceedings of this TCM was subsequently compiled in an IAEA Working Material. One of the main recommendations of this TCM, called for the harmonization of criteria and methods used in Member States in seismic reassessment and upgrading of existing NPPs. Twenty four institutions from thirteen countries participated in the CRP named 'Benchmark study for the seismic analysis and testing of WWER type NPPs'. Two types of WWER reactors (WWER-1000 and WWER-440/213) selected for benchmarking. Kozloduy NPP Units 5/6 and Paks NPP represented these respectively as prototypes. Consistent with the recommendations of the TCM and the working paper prepared by the subsequent Consultants' Meeting, the focal activity of the CRP was the benchmarking exercises. A similar methodology was followed both for Paks NPP and Kozloduy NPP Unit 5. Firstly, the NPP (mainly the reactor building) was tested using a blast loading generated by a series of explosions from buried TNT charges. Records from this test were obtained at several free field locations (both downhole and surface), foundation mat, various elevations of structures as well as some tanks and the stack. Then the benchmark participants were provided with structural drawings, soil data and the free field record of the blast experiment. Their task was to make a blind prediction of the response at preselected locations. The analytical results from these participants were then compared with the results from the test. Although the benchmarking exercises constituted the focus of the CRP, there were many other interesting problems related to the seismic safety of WWER type NPPs which were addressed by the participants. These involved generic studies, i.e. codes and standards used in original WWER designs and their comparison with current international practice; seismic analysis

  10. Can the Ignalina NPP be safe?

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Many countries started using nuclear power before Lithuania, the IAEA and NEA were established and have been functioning efficiently, numerous conventions have been signed that control nuclear activities, nuclear safety regulations and standards have been set. Lithuania which is striving to integrate into the West European structures and to become a member of the 'club' of the world's nuclear states, has become a full and equal member of the IAEA and recognises its recommendations. Furthermore, it has signed or joined international conventions and is doing its best to introduce the practice of controlling nuclear safety applied in western countries. Nuclear safety cannot be taken as something finite that does not change. The requirements of nuclear and radiation safety are continuously redefined taking into consideration scientific discoveries and inventions as well as technical progress. Safety assurance can be the only criterion that should determine whether the nuclear power plant can be operated in Lithuania. The safety analysis report confirmed that the Ignalina NPP can be safely operated until the channel-graphite gap closes. The experiments conducted to date have convincingly shown that by the year 2000 the gap will not close in any of the fuel channels of unit 1. It can be hoped that the submitted studies, analyses and assessments will confirm that the Ignalina NPP meets Lithuania's nuclear safety requirements that have been drawn up in compliance with the recommendations of IAEA

  11. Enhancing NPP Safety Through an Effective Dependability Management

    Energy Technology Data Exchange (ETDEWEB)

    Vieru, G., E-mail: g_vieru@yahoo.com [AREN, Bucharest (Romania)

    2014-10-15

    Taking into account the importance of the continuous improvement of the performance and reliability of a NPP and practical measures to strengthen nuclear safety and security, it is to be noted that a good management for a nuclear power reactor involves a ''good dependability management'' of the activities, such as: Reliability, Availability, Maintainability (RAM) and maintenance support. In order to evaluate certain safety assessment criteria intended to be applied at the level of the nuclear reactor unit management, equipment dependability indicators and their impact over the availability and reactor safety have to be evaluated. Reactor equipment dependability indicators provide a quantitative indication of equipment RAM performances (Reliability, Availability and Maintenance). One of the important benefits of maintenance and failure data gathering is that it can be used as a support of probabilistic safety assessment (PSA). Also, a good dependability management implementation may be used to complement reactor level unit performance indicators in the field of safe operation, maintenance and improving operating parameters, as well as for Strengthening Safety and Improving Reliability of a NPP. This paper underlines the importance of nuclear safety and security as prerequisites for nuclear power. In addition, it demonstrates how different technical aspects, through implementation of a good dependability management, contribute to a strengthened safety and an improvement of availability of the NPP through dependability indicators determination and evaluation. (author)

  12. Concentration of WWER-1000 unit power on one site

    International Nuclear Information System (INIS)

    Rousek, J.; Kysel, J.; Sladek, V.

    1987-01-01

    The problem of a suitable number of nuclear power plant units built on one site is discussed. Using an example of three sites being prepared now in Czechoslovakia, two alternatives - one with two WWER-1000 units, the other with four WWER-1000 units on one site - are evaluated from the viewpoint of long-range nuclear power development program in Czechoslovakia, costs, transmission of electric power and heat supply. (author). 10 tabs., 13 refs

  13. Risk-based assessment of the allowable outage times for the unit 1 leningrad nuclear power plant ECCS components

    International Nuclear Information System (INIS)

    Koukhar, Sergey; Vinnikov, Bronislav

    2009-01-01

    Present paper describes a method for risk - informed assessment of the Allowable Outage Times (AOTs). The AOT is the time, when components of a safety system allowed to be out of service during power operation or during shutdown operation off a plant. If the components are not restored during the time, the plant in operation must be shut down or the plant in a given shutdown mode has to go to safer shutdown mode. Application of the method is also provided for the equipment of the Unit 1 Leningrad NPP ECCS components. For solution of the problem it is necessary to carry out two series of computations using a Living PSA model, level 1. In the first series of the computations the core damage frequency (CDFb) for the base configuration of the plant is determined (there is no equipment out of service). Here the symbol 'b' means the base configuration of a plant. In the second series of the computations the core damage frequency (CDFi) for the configuration of the plant with the component (which is out of service) is calculated. That is here CDFi is determined for the failure probability of the component equal to 1.0 (component 'i' is unavailable). Then it is necessary to determine so called Risk Increase Factor (RIF) using the following ratio: RIFi = CDFi / CDFb. At last the AOT is calculated with the help of the ratio: AOTi = Tppr / RIFi, where Tppr is a period of time between two Planned Preventive Repairs (PPRs). 1. Using the risk based approach the AOTs were calculated for a set of the components of the Unit 1 Leningrad NPP ECCS components. 2. The main conclusion from the analysis is that the current deterministic AOTs for the ECCS components are conservative and should be extended. 3. The risk based extension of the AOTs for the ECCS components can prevent the Unit 1 Leningrad NPP to enter into the operating modes with increased risk. (author)

  14. Practical experience with the leaky-fuel monitoring at Bohunice NPP

    International Nuclear Information System (INIS)

    Kacmar, M.; Cizek, J.

    2001-01-01

    The first part of this paper describes practical experience with the fuel monitoring in operating reactors from point of view possible leakages. Summarized in the paper are numbers leaky fuel assemblies both for NPP and for particular units. Some failure causes are discussed for operational conditions of Bohunice NPP. In the second part of paper critical power ramps on hot fuel rod of leaky fuel assemblies are analysed to eliminate failures from PCI. The main aim of the paper is the need to understand the mechanism and causes of failures (Authors)

  15. Application of the combined cycle LWR-gas turbine to PWR for NPP life extension, safety upgrade and improving economy

    International Nuclear Information System (INIS)

    Kuznetsov, Yu.N.; Gabaraev, B.A.

    2002-01-01

    Full text: The unconventional technology to extend the lifetime for the NPPs now in operation and make a construction of new NPPs cheaper - erection of steam-gas toppings to the nuclear power units - is considered in the paper. Application of the steam-gas toppings permits through reducing power of ageing reactors to extend lifetime of nuclear power unit, enhance its safety and at the same time to keep full load operation of NPP turbine and other balance-of-plant equipment. Proposed technology is examined for Russian VVER-440 reactor as an example and, also, as a pilot project, for Russian boiling VK-50 reactor now in operation Application of the steam-gas topping permits: extend the service life of ageing VVER-440 reactor by 10...15 years; use the turbine and other NPP balance-of-plant equipment at full power; increase the efficiency of combined cycle up to 48% and more; enhance the safety of NPP operation; utilize NPP balance-of-plant equipment after reactor decommissioning; perform the cost-effective operation in maneuvering modes; increase capacity factor of the plant. The construction of pilot project on the basis of the VK-50 reactor will allow not only to demonstrate new technology but also to attain appreciable economic effect including that obtained due to using the available reserves of the NPP turbine. (author)

  16. Reliability of Power Units in Poland and the World

    OpenAIRE

    Józef Paska

    2015-01-01

    One of a power system’s subsystems is the generation subsystem consisting of power units, the reliability of which to a large extent determines the reliability of the power system and electricity supply to consumers. This paper presents definitions of the basic indices of power unit reliability used in Poland and in the world. They are compared and analysed on the basis of data published by the Energy Market Agency (Poland), NERC (North American Electric Reliability Corporation – USA), ...

  17. 75 FR 80547 - Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption

    Science.gov (United States)

    2010-12-22

    ..., Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption 1.0 Background Carolina Power & Light Company... operation of the Shearon Harris Nuclear Power Plant (HNP), Unit 1. The license provides, among other things... request to generically extend the rule's compliance date for all operating nuclear power plants, but noted...

  18. Reactor noise analysis applications in NPP I and C systems

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckler, O. [International Atomic Energy Agency, Wagramer Strosse 5, A-1400 Vienna, Austria Ontario Power Generation, 230 Westney Road South, Ajax, Ont. L1S 7R3 (Canada)

    2006-07-01

    Reactor noise analysis techniques are used in many NPPs on a routine basis as 'inspection tools' to get information on the dynamics of reactor processes and their instrumentation in a passive, non-intrusive way. The paper discusses some of the tasks and requirements an NPP has to take to implement and to use the full advantages of reactor noise analysis techniques. Typical signal noise analysis applications developed for the monitoring of the reactor shutdown system and control system instrumentation of the Candu units of Ontario Power Generation and Bruce Power are also presented. (authors)

  19. Anticorrosion and halobios control for tidal power generating units

    International Nuclear Information System (INIS)

    Shen, J C; Ding, L X

    2012-01-01

    The anticorrosion and halobios control is the key techniquesrelated to the safety and durability of tidal power generating units. The technique of material application, antifouling coating and cathodic protection are often adopted. The technical research, application, updating and development are carried on Jiangxia Tidal Power Station, which is based on the old Unit 1-Unit 5 operated for nearly 30 years, and the new Unit 6 operated in 2007. It is found that stainless steeland the antifouling coating used in Unit 1- Unit 5 are very effective, but cathodic protection is often likely to fail because of the limitation of structure and installation. Analyses and studies for anticorrosion and halobios control techniques of tidal power generating units according to theory, experience and actual effects have been done, which can be for reference to the tidal power station designers and builders.

  20. Cernavoda NPP impact study on terrestrial and aquatic biota. Preliminary results

    International Nuclear Information System (INIS)

    Bobric, Elena; Bucur, Cristina; Popescu, Ion; Simionov, Vasile; Titescu, Gheorghe; Varlam, Carmen

    2010-01-01

    Recently, the awareness of the vulnerability of the environment has increased and the need to protect it against industrial pollutants has been recognized. The concept of sustainable development, requires new and developing international policies for environmental protection. See 'Protection of the environment from the effects of ionizing radiation' IAEA-TECDOC-1091, International Atomic Energy Agency, Vienna. As it is recommended in 'Cernavoda Unit No. 2 NPP Environmental Impact Assessment CES-03702-IAD-006', it is Cernavoda NPP responsibility to conduct an Ecological Risk Assessment study, mainly to assess the impact of nuclear power plant operation on terrestrial and aquatic biota. Long records from normal operation of Cernavoda Unit 1, wind pattern, meteorological conditions, and source terms data were used to evaluate areas of interest for environmental impact, conducting to a circle of 20 km radius around mentioned nuclear objective. The screening campaign established tritium level (because Cernavoda NPP is a CANDU type reactor, and tritium is the most important radioisotope evacuated in the environment) in air, water, soil and vegetation, focusing the interest area on particular ecosystem. Using these primary data it was evaluated which are the monitored ecological receptors and which are the measurement endpoints.This paper presents the Ecological Risk Assessment at Cernavoda NPP technical requirements, and the preliminary results of evaluating criteria for representative ecosystem components at Cernavoda NPP. (authors)

  1. Specific problems in Kozloduy municipality, concerning NPP operation and decommissioning

    International Nuclear Information System (INIS)

    Pironkova, L.

    2000-01-01

    The only nuclear power plant in Bulgaria, which operates for 25 years is located in Kozloduy. Kozloduy municipality is situated in the northern part of Danube plane, includes the administrative center and four villages. It is 200 km far from Sofia and 80 km from the regional center Vratza. The Kozloduy NPP operates 6 units of total capacity 3760 MW, producing more than 40% of the electricity needs in Bulgaria. Settled and recurring problems of the municipality are related to economic, geographical, demographic and administration issues. Future problems will be related to forthcoming reactor shutdown and decommissioning. This involves economic problems, possible bankruptcies of local firms servicing the NPP, decreasing budget and living standard, expected restrictions of social programs, increasing unemployment, possible changes in demographic structure of population

  2. Safety reassessment of the Paks NPP (the AGNES project)

    Energy Technology Data Exchange (ETDEWEB)

    Gado, J [Hungarian Academy of Sciences, Budapest (Hungary). Central Research Inst. for Physics; Bajsz, J; Cserhati, A; Elter, J [Paksi Atomeroemue Vallalat, Paks (Hungary); Hollo, E [Energiagazdalkodasi Intezet, Budapest (Hungary); Kovacs, K [EROTERV Engineering and Contractor Co (Hungary); Maroti, L [Hungarian Academy of Sciences, Budapest (Hungary). Central Research Inst. for Physics; Miko, S [Paksi Atomeroemue Vallalat, Paks (Hungary); Techy, Z [Energiagazdalkodasi Intezet, Budapest (Hungary); Vidovszky, I [Hungarian Academy of Sciences, Budapest (Hungary). Central Research Inst. for Physics

    1996-12-31

    The reassessment of the Paks NPP safety according to internationally recognized criteria of the Advanced General and New Evaluation of Safety (AGNES) project is outlined. The Paks NPP consists of four WWER-440/V-213 units. The following groups of analysis have been performed: system analysis and description; analysis of design basis accidents; severe accidents analysis; level 1 probabilistic safety analysis. Postulated accidents (PA) and Anticipated Operational Occurrences (AOO) are estimated in detail for the following initiating events: increase/decrease in secondary heat removal; decrease in primary coolant inventory; increase/decrease of reactor coolant inventory; reactivity and power distribution anomalies; analysis of transients with the failure of reactor scram (ATWS); pressurized thermal shock analyses. Severe accident analysis was made for the accidents on in-vessel phase and containment phase, for radioactive release and for accident management.

  3. 'Kozloduy' NPP geological environment as a barrier against radionuclide migration

    International Nuclear Information System (INIS)

    Antonov, D.

    2000-01-01

    The aim of this report is to present an analysis of the geological settings along Kozloduy NPP area from the viewpoint of a natural, protective barrier against unacceptable radionuclides migration in the environment. Possible sources of such migration could be an eventual accident in an active nuclear plant; radioactive releases from decommissioned Power Units or from temporary or permanent radioactive waste repositories. The report is directed mainly to the last case, and especially to the site selection for near surface short lived low and intermediate level (LILW) radioactive repository. The main conclusion of the geological settings assessment and of the many years monitoring is that the Kozloduy NPP area offers good possibilities for site selection of LILW repository. (author)

  4. Safety reassessment of the Paks NPP (the AGNES project)

    International Nuclear Information System (INIS)

    Gado, J.; Hollo, E.; Kovacs, K.; Maroti, L.; Techy, Z.; Vidovszky, I.

    1995-01-01

    The reassessment of the Paks NPP safety according to internationally recognized criteria of the Advanced General and New Evaluation of Safety (AGNES) project is outlined. The Paks NPP consists of four WWER-440/V-213 units. The following groups of analysis have been performed: system analysis and description; analysis of design basis accidents; severe accidents analysis; level 1 probabilistic safety analysis. Postulated accidents (PA) and Anticipated Operational Occurrences (AOO) are estimated in detail for the following initiating events: increase/decrease in secondary heat removal; decrease in primary coolant inventory; increase/decrease of reactor coolant inventory; reactivity and power distribution anomalies; analysis of transients with the failure of reactor scram (ATWS); pressurized thermal shock analyses. Severe accident analysis was made for the accidents on in-vessel phase and containment phase, for radioactive release and for accident management

  5. Trial operation of TVS-2 at Balakovo NPP. Analysis of results and further modernization

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Molchanov, V.; Pavlovichev, A.; Novikov, A.; Enin, A.

    2006-01-01

    In this report the more detailed specifications of TVS-2 considering modifications of separate units, and also the conditions and results of its operation at Balakovo NPP on the basis of three fuel loads are presented. Implementation of TVS-2 at power units of Balakovo NPP in the fuel cycle 3x350 eff. days has been started in 2003 and the reactor core full loading at Balakovo NPP, Unit 1 has been achieved in 2005. Considering positive operational experience of TVS-2 at Unit 1 implementation of TVS-2 by full make-ups has been started at other units of Balakovo NPP. The operational results confirm the predicted essential increasement in reliability of reactor scram, possibility of implementation of new design restrictions, which enable to form the fuel loading with small neutron leakage. Besides, the favorable results on performance of transport - technological procedures enabling to reduce time of PM has been obtained. On the basis of this structure the detailed project report of a new FA modification with lengthened fuel stack has been developed, the necessary calculational and experimental justifications have been performed, materials for obtaining a license to trial operation of the first lot of such fuel assemblies beginning from 2006 are being prepared

  6. The thermal-mechanical behavior of fuel pins during power's maneuvering regime at stationary core loading on 2nd unit of KHNPP

    International Nuclear Information System (INIS)

    Ieremenko, M.; Ovdiyenko, Y.; Khalimonchuk, V.

    2007-01-01

    Results of thermal-mechanical behaviour of fuel pins during daily power's maneuvering regime that were proposed for second unit of Khmelnitsky NPP are presented. Calculations were performed for campaign's moments 100 and 160 fpd and for different type of regulation. Additionally calculations were performed for campaign 7. It is the design variant of the campaign and reactor core contains the high burnt fuel. Calculations of macro-core parameters (Kq, Kv) was performed by spatial computer code DYN3D. Calculations of micro-core parameters (fuel pin power) was performed by computer code DERAB. Calculations of thermal-mechanical behaviour of fuel pins was performed by computer code TRANSURANUS (Authors)

  7. 14 CFR 25.1142 - Auxiliary power unit controls.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Auxiliary power unit controls. 25.1142... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Powerplant Controls and Accessories § 25.1142 Auxiliary power unit controls. Means must be provided on the flight deck for starting...

  8. 14 CFR 29.1142 - Auxiliary power unit controls.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Auxiliary power unit controls. 29.1142... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Powerplant Controls and Accessories § 29.1142 Auxiliary power unit controls. Means must be provided on the flight deck for starting...

  9. High Input Voltage, Silicon Carbide Power Processing Unit Performance Demonstration

    Science.gov (United States)

    Bozak, Karin E.; Pinero, Luis R.; Scheidegger, Robert J.; Aulisio, Michael V.; Gonzalez, Marcelo C.; Birchenough, Arthur G.

    2015-01-01

    A silicon carbide brassboard power processing unit has been developed by the NASA Glenn Research Center in Cleveland, Ohio. The power processing unit operates from two sources: a nominal 300 Volt high voltage input bus and a nominal 28 Volt low voltage input bus. The design of the power processing unit includes four low voltage, low power auxiliary supplies, and two parallel 7.5 kilowatt (kW) discharge power supplies that are capable of providing up to 15 kilowatts of total power at 300 to 500 Volts (V) to the thruster. Additionally, the unit contains a housekeeping supply, high voltage input filter, low voltage input filter, and master control board, such that the complete brassboard unit is capable of operating a 12.5 kilowatt Hall effect thruster. The performance of the unit was characterized under both ambient and thermal vacuum test conditions, and the results demonstrate exceptional performance with full power efficiencies exceeding 97%. The unit was also tested with a 12.5kW Hall effect thruster to verify compatibility and output filter specifications. With space-qualified silicon carbide or similar high voltage, high efficiency power devices, this would provide a design solution to address the need for high power electric propulsion systems.

  10. Accident on the Chernobyl nuclear power plant. Getting over the consequences and lessons learned

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Vasil'chenko, V.N.; Klyuchnikov, A.A.; Prister, B.S.

    2006-01-01

    The book is devoted to the 20 anniversary of the accident on the 4th Power Unit of the Chernobyl NPP. The power plant construction history, accident reasons, its consequences, the measures on its liquidation are represented. The current state of activity on the Chernobyl power unit decommission, the 'Shelter' object conversion into the ecologically safe system is described. The future of the Chernobyl NPP site and disposal zone is discussed

  11. Energy efficiency of computer power supply units - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Aebischer, B. [cepe - Centre for Energy Policy and Economics, Swiss Federal Institute of Technology Zuerich, Zuerich (Switzerland); Huser, H. [Encontrol GmbH, Niederrohrdorf (Switzerland)

    2002-11-15

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at the efficiency of computer power supply units, which decreases rapidly during average computer use. The background and the purpose of the project are examined. The power supplies for personal computers are discussed and the testing arrangement used is described. Efficiency, power-factor and operating points of the units are examined. Potentials for improvement and measures to be taken are discussed. Also, action to be taken by those involved in the design and operation of such power units is proposed. Finally, recommendations for further work are made.

  12. Project equipment HVAC chilled with R22 in the NPP Asco; Proyecto de sustitucion de equipos HVAC refrigerados con R22 en la C.N. Asco

    Energy Technology Data Exchange (ETDEWEB)

    Jaimot Jimenez, J. J.; Imbert, J. J.

    2013-07-01

    This paper describes the project of changing units of air conditioning in the Asco NPP currently used R22 as coolant. The project has a powerful, affecting 37 units, of which more than half are Clase1E. The document describes the process of sizing, scope of change and solutions adopted for this change of design.

  13. Determining the residual lifetime for the main RBMK components in frame of life extension of power units

    International Nuclear Information System (INIS)

    Baldin, V.D.; Petrov, A.A.; Potapov, A.A.

    2005-01-01

    At present time 11 power units of NPPs with RBMK reactors produce annually 140 billion kWh of electricity, which is about half of all electricity generated at Russian NPPs. Commissioned during the period of 1973 to 1990, they have the specified service life of 30 years. The power units have been regularly upgraded during operation to raise their safety and reliability. As the result now they meet modem requirements in terms of safety and their lifetime can considerably exceed their specified service life. The task of the plant life extension becomes more urgent. The main nonreplaceable RBMK reactor components that determine the reactor life, are graphite stack and metal support structures. The aging of these structures is monitored and the structures residual lifetime is predicted in accordance with procedures approved by regulatory authorities. The lead unit among all RBMK power units is Leningrad NPP Unit 1 commissioned in 1973. A complex of activities was performed for this power unit in 2002-2003 to prove the feasibility of its life extension. In terms of defining the residual lifetime of the reactor components, the activities were performed in three major areas: - examination of the state of the reactor structures; - materials studies of irradiated metal and graphite specimens in hot chambers; - performing the calculation and prediction evaluations. The results of examining the metal structures and studying specimens have shown that: 1)The metal and the welds do not have visible defects. The state of protective coatings is largely satisfactory. 2)The ultimate strength and hardness of steel have grown. 3)The brittle fracture transition temperature shift is at the allowable level. 4)The leak-tightness of the metal structures has not been violated. The results of the graphite stack examination have shown that the graphite is at the hardening stage. No tendency for deterioration of mechanical properties has been recorded. According to the results of measuring the

  14. Fission product source from Ignalina NPP in case of loss-of-coolant accidents

    International Nuclear Information System (INIS)

    Ubonavicius, E.; Rimkevicius, S.

    2001-01-01

    The release of radioactive materials to the environment is of special importance in the case of any accident at Nuclear Power Plants (NPP). The integrated analysis of thermal-hydraulic parameters behavior and radioactive fission products (FP) transport and deposition in the compartments play an important role in the evaluation of FP release to the environment and determines the irradiation dozes of personnel and public. In this report the transport and the deposition of radioactive material in the Ignalina NPP unit 1 compartments as well as the FP source term to the environment in the case of design basis loss-of-coolant accidents are discussed. The calculation models for the evaluation of FP transport and deposition as well as the results of performed calculations of several accidents at Ignalina NPP are presented. (author)

  15. Fusion of eastern and western technology in VVER 1000 NPP upgrade

    International Nuclear Information System (INIS)

    Ubra, O.; Fleischhans, J.; Kveton, M.

    1997-01-01

    An extensive modernization program upgrading two units of VVER 1000 type of the Czech nuclear power plant (NPP) Temelin to meet the latest international standards is presented. The program is based primarily on combination of eastern and western technology and it has been implemented during plant construction. The NPP Temelin was originally designed according to the standards of the former Soviet Union. After a series of reviews in the 1990s, a decision was made by the Temelin management of upgrade the design of the plant, including the supply of fuel and instrumentation and control system by a western company. The adoption of western technology and practices has helped to solve a large number of IAEA safety issues related to design and operation of VVER 1000 NPP. Details on the current Temelin design and other related safety matters are presented

  16. A new Finnish nuclear power unit

    International Nuclear Information System (INIS)

    2004-01-01

    In Finland, nuclear power is considered a natural part of a sustainable energy system. The Finnish Parliament has decided that development of nuclear power is consistent with the overall interests of society when climate issues, environmental targets, supply security and stable and competitive prices of electric power are considered as a whole. In 2002, the Finnish Parliament approved the Government's decision in principle to build a fifth nuclear power plant. The new project is the most advanced energy project in the Nordic countries with respect to the availability of energy free of carbon dioxide. The decision is also welcomed by the EU. The new reactor will be of the EPR (European Pressurized Water Reactor) type. In addition to supplying power to the Finnish industries, the plant is considered necessary if Finland is to comply with international conventions on CO 2 emissions

  17. Effects of SMES units on power system stability

    International Nuclear Information System (INIS)

    Byerly, R.T.; Juves, J.A.

    1980-01-01

    A mathematical model suitable for representing SMES units in power system stability studies has been developed and incorporated into an existing large-scale stability program. Demonstration studies have been performed which emphasize the use of SMES units to improve the damping of oscillations associated with synchronizing power flow among generators. The capability exists to conduct stability studies of large systems which include SMES units

  18. Reliability of Power Units in Poland and the World

    Directory of Open Access Journals (Sweden)

    Józef Paska

    2015-09-01

    Full Text Available One of a power system’s subsystems is the generation subsystem consisting of power units, the reliability of which to a large extent determines the reliability of the power system and electricity supply to consumers. This paper presents definitions of the basic indices of power unit reliability used in Poland and in the world. They are compared and analysed on the basis of data published by the Energy Market Agency (Poland, NERC (North American Electric Reliability Corporation – USA, and WEC (World Energy Council. Deficiencies and the lack of a unified national system for collecting and processing electric power equipment unavailability data are also indicated.

  19. Power Efficient Division and Square Root Unit

    DEFF Research Database (Denmark)

    Liu, Wei; Nannarelli, Alberto

    2012-01-01

    Although division and square root are not frequent operations, most processors implement them in hardware to not compromise the overall performance. Two classes of algorithms implement division or square root: digit-recurrence and multiplicative (e.g., Newton-Raphson) algorithms. Previous work....... The proposed unit is compared to similar solutions based on the digit-recurrence algorithm and it is compared to a unit based on the multiplicative Newton-Raphson algorithm....

  20. Nuclear Fuel in Cofrentes NPP

    International Nuclear Information System (INIS)

    2002-01-01

    Fuel is an essential in the nuclear power generating business because of its direct implications on safety, generating costs and the operating conditions and limitations of the facility. Fuel management in Cofrentes NPP has been targeted at optimized operation, enhanced reliability and the search for an in-depth knowledge of the design and licensing processes that will provide Iberdrola,as the responsible operator, with access to independent control of safety aspects related to fuel and free access to manufacturing markets. (Author)

  1. Decommissioning of Brennilis NPP

    International Nuclear Information System (INIS)

    Baize, Jean-Marc

    1998-01-01

    This EDF press communique give information related to the decommissioning of the Brennilis NPP. The following five items are developed in this report: 1. the level-2 decommissioning operations at the Brennilis NPP; 2. the Brennilis NPP, a pilot operation from the commissioning up to the decommissioning; 3. history of the Brennilis NPP decommissioning; 4. the types of radioactive wastes generated by the Brennilis NPP decommissioning; 5. the Brennilis NPP - a yard management as a function of the wastes. The document contains also seven appendices addressing the following subjects: 1. the share of decommissioning assigned to EDF and the decommissioning steps; 2. the EDF installations in course of decommissioning; 3. the CEA decommissioned installations or in course of decommissioning; 4. regulations; 5. costs; 6. waste management - principles; 7. data on the decommissioning yard

  2. Financial and organizational models of NPP construction projects

    International Nuclear Information System (INIS)

    Ivanov, Timur

    2010-01-01

    The recent evolution of financial and organizational models of NPP projects can be truly reputed to open a new page of the world market of NPP construction. The definition of the concrete model is based mostly on specific cooperation backgrounds and current terms and conditions under which the particular NPP project is being evolved. In this article the most commonly known strategies and schemes of financing structuring for export NPP construction projects are scrutinized. Special attention is paid to the analysis of BOO/BOT models which are based on the public-private partnership. Most BOO/BOT projects in the power sector has Power Purchase Agreements (PPA) as an integral part of them. The PPA key principles are studied here as well. The flexibility and adaptability of the public-private partnership models for financing and organization of the NPP projects contributes substantially to the competitiveness of the NPP projects especially under current economic conditions. (orig.)

  3. Lessons learnt from Ignalina NPP decommissioning project

    International Nuclear Information System (INIS)

    NAISSE, Jean-Claude

    2007-01-01

    The Ignalina Nuclear Power Plant (INPP) is located in Lithuania, 130 km north of Vilnius, and consists of two 1500 MWe RBMK type units, commissioned respectively in December 1983 and August 1987. On the 1. of May 2004, the Republic of Lithuania became a member of the European Union. With the protocol on the Ignalina Nuclear Power in Lithuania which is annexed to the Accession Treaty, the Contracting Parties have agreed: - On Lithuanian side, to commit closure of unit 1 of INPP before 2005 and of Unit 2 by 31 December 2009; - On European Union side, to provide adequate additional Community assistance to the efforts of Lithuania to decommission INPP. The paper is divided in two parts. The first part describes how, starting from this agreement, the project was launched and organized, what is its present status and which activities are planned to reach the final ambitious objective of a green field. To give a global picture, the content of the different projects that were defined and the licensing process will also be presented. In the second part, the paper will focus on the lessons learnt. It will explain the difficulties encountered to define the decommissioning strategy, considering both immediate or differed dismantling options and why the first option was finally selected. The paper will mention other challenges and problems that the different actors of the project faced and how they were managed and solved. The paper will be written by representatives of the Ignalina NPP and of the Project Management Unit. (author)

  4. On the NPP structural reliability

    International Nuclear Information System (INIS)

    Klemin, A.I.; Polyakov, E.F.

    1980-01-01

    Reviewed are the main statements peculiarities and possibilities of the first branch guiding technical material (GTM) ''The methods of calculation of structural reliability of NPP and its systems at the stage of projecting''. It is stated, that in GTM presented are recomendations on the calculation of reliability of such specific systems, as the system of the reactor control and protection the system of measuring instruments and automatics and safe systems. GTM are based on analytical methods of modern theory of realibility with the Use of metodology of minimal cross sections of complex systems. It is stressed, that the calculations on the proposed methods permit to calculate a wide complex of reliability parameters, reflecting separately or together prorerties of NPP dependability and maintainability. For NPP, operating by a variable schedule of leading, aditionally considered are parameters, characterizing reliability with account of the proposed regime of power change, i.e. taking into account failures, caused by decrease of the obtained power lower, than the reguired or increase of the required power higher, than the obtained

  5. Treatment of NPP wastes using vitrification

    International Nuclear Information System (INIS)

    Sobolev, I.A.; Lifanov, F.A.; Stefanovsky, S.V.; Kobelev, A.P.; Savkin, A.E.; Kornev, V.I.

    1998-01-01

    Glass-based materials to immobilize various liquid and solid radioactive wastes generated at nuclear power plants (NPP) were designed. Glassy waste forms can be produced using electric melting including a cold crucible melting. Leach rate of cesium was found to be 10 -5 -10 -6 g/(cm 2 day) (IAEA technique). Volume reduction factor after vitrification reached 4-5. Various technologies for NPP waste vitrification were developed. Direct vitrification means feeding of source waste into the melter with formation of glassy waste form to be disposed. Joule heated ceramic melter, and cold crucible were tested. Process variables at treatment of Kursk, Chernobyl (RBMK), Kalinin, Novovoronezh (VVER) NPP wastes were determined. The most promising melter was found to be the cold crucible. Pilot plant based on the cold crucibles has been designed and constructed. Solid burnable NPP wastes are incinerated and slags are incorporated in glass. (author)

  6. NPP A-1 decommissioning - Phase I

    International Nuclear Information System (INIS)

    Krstenik, A.; Blazek, J.

    2000-01-01

    Nuclear power plant A-1 with output 150 MW e , with metallic natural uranium fuelled, CO 2 cooled and heavy water moderated reactor had been prematurely finally shut down in 1977. It is necessary to mention that neither operator nor regulatory and other authorities have been prepared for the solution of such situation. During next two consecutive years after shutdown main effort of operator focused on technical and administrative activities which are described in the previous paper together with approach, condition and constraints for NPP A-1 decommissioning as well as the work and research carried out up to the development and approval of the Project for NPP A-1 decommissioning - I. phase. Subject of this paper is description of: (1) An approach to NPP A -1 decommissioning; (2) An approach to development of the project for NPP A-1 decommissioning; (3) Project - tasks, scope, objectives; (4) Mode of the Project realisation; (5) Progress achieved up to the 1999 year. (authors)

  7. Simulator training and human factor reliability in Kozloduy NPP, Bulgaria

    International Nuclear Information System (INIS)

    Stoychev, Kosta

    2007-01-01

    This is a PowerPoint presentation. Situated in North Bulgaria, in the vicinity of the town of Kozloduy, near the Danube River bank, there is the Bulgarian Kozloduy Nuclear Power plant operating four WWER-440 and two WWER-1000 units. Units 1 and 2 were commissioned in July, 1974 and November, 1975, respectively. These were shut down at the end of 2003. Units 3 and 4 were commissioned in December, 1980 and May, 1982. They were shut down at the end of 2006 as a precondition for Bulgaria's accession to the European Union. The 1000 MW units 5 and 6 of Kozloduy NPP were commissioned in September, 1988 and December, 1993, respectively. Large-scale modernization have been implemented and now the units meet all international safety standards. The paper describes the multifunctional simulator Kozloduy NPP for the operational staff training. The training stages are as follows: - Preparatory; -Theoretical studies; - Training at the Training Centre by means of technical devices; - Preparation and sitting for an exam before a Kozloduy NPP expert commission; - Simulator training ; - Preparation to obtain a permit for a license, corresponding to the position to begin work at the NPP; - Exams before the Nuclear Regulatory Agency (NRA) and licensing; - Shadow training at the working place; - Permission for unaided operation. The following positions are addressed by the simulator training: - Chief Plant Supervisor; - Shift Unit Supervisor; - Senior Reactor Operator; - Simulator Instructor; - Controller physicist; -Senior Turbine Operator; - Senior Operator of Turbine Feedwater Pumps of Kozloduy NPP. Improving of training method led to a reduction of number of significant events while worldwide practice proves that improvement of engineering resulted in an increase in the percentage of events, related to human factor. Analysis of human reliability in 2005 and 2006 in cooperation with representatives from Great Britain and the Technical University in Sofia were worked on the DTI NSP B

  8. Current status of Chernobyl NPP decommissioning

    International Nuclear Information System (INIS)

    2009-01-01

    Strategy of Chernobyl NPP decommissioning with the decommissioning license 2002-2064 is presented. The main activities at the stage of ChNPP units shutdown (2002 - 2012) are: units maintenance in safe state; decommissioning infrastructure construction; unloading of SNF – main activity determining the stage duration; systems and elements final shutdown; decommissioning life-support systems reconstruction; Comprehensive engineering and radiation survey (CERS); dismantling of the reactor facilities external equipment; removal of RAW from units; decommissioning documentation development. The decommissioning activities main results are presented

  9. Determination of Safety Performance Grade of NPP Using Integrated Safety Performance Assessment (ISPA) Program

    International Nuclear Information System (INIS)

    Chung, Dae Wook

    2011-01-01

    Since the beginning of 2000, the safety regulation of nuclear power plant (NPP) has been challenged to be conducted more reasonable, effective and efficient way using risk and performance information. In the United States, USNRC established Reactor Oversight Process (ROP) in 2000 for improving the effectiveness of safety regulation of operating NPPs. The main idea of ROP is to classify the NPPs into 5 categories based on the results of safety performance assessment and to conduct graded regulatory programs according to categorization, which might be interpreted as 'Graded Regulation'. However, the classification of safety performance categories is highly comprehensive and sensitive process so that safety performance assessment program should be prepared in integrated, objective and quantitative manner. Furthermore, the results of assessment should characterize and categorize the actual level of safety performance of specific NPP, integrating all the substantial elements for assessing the safety performance. In consideration of particular regulatory environment in Korea, the integrated safety performance assessment (ISPA) program is being under development for the use in the determination of safety performance grade (SPG) of a NPP. The ISPA program consists of 6 individual assessment programs (4 quantitative and 2 qualitative) which cover the overall safety performance of NPP. Some of the assessment programs which are already implemented are used directly or modified for incorporating risk aspects. The others which are not existing regulatory programs are newly developed. Eventually, all the assessment results from individual assessment programs are produced and integrated to determine the safety performance grade of a specific NPP

  10. Preparing nuclear power plant units for operation

    International Nuclear Information System (INIS)

    Hudcovic, R.; Telgarsky, K.; Kmosena, J.

    1984-01-01

    The factors are listed which have to be taken into consideration for planning the unit operation, i.e., the implementation of planned repairs, checks of equipment and refuellings. All basic input data were evaluated as the basic for drawing up the schedule of routine repairs and overhauls for the coming period. (E.S.)

  11. Item 01: Peculiarities during installation of forced filtered venting system, units 3 and 4 of Kozloduy NPP

    International Nuclear Information System (INIS)

    Dinev, D.

    2005-01-01

    The Forced Filtered Venting System (FFV) is designated to minimize the uncontrolled and unfiltered release of activity to the environment due to untightness of the confinement in case of a severe accident. In this paper the flow diagram of FFV, Units 3 and 4 is shown and the main components of the system which are installed in RB, in Rooms A 031/2, A032/3, A031/4, at elevation 2.10 m are described. Calculation models of the pipelines of FFV were developed based on the requirements to the design and the input data, which were collected and analyzed. The graphic part of the model is presented at calculation schemes. The pipelines are checked according to the requirements of the ASME Code and the equations for calculation of the connected pipelines are stipulated in ASME NC-3650. The enclosed photos illustrate the most relevant positions of the modifications. In conclusion the positive aspects of the mounting experience for this unique installation are analyzed and the weak points are stated aiming at the improvement of the quality of preparation, organization and complete performance for similar facilities

  12. Sensitivity Analysis of RCW Temperature on the Moderator Subcooling Margin for the LBLOCA of Wolsong NPP Unit 1

    Energy Technology Data Exchange (ETDEWEB)

    Seo, Si Won; Kim, Jong Hyun; Choi, Sung Soo [Atomic Creative Technology Co., Daejeon (Korea, Republic of); Kim, Sung Min [Central Research Institute, Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)

    2016-05-15

    Moderator subcooling margin has been analyzed using the MODTURC{sub C}LAS code in the Large LOCA FSAR PARTs C and F. Performance of moderator heat exchangers depends on RCW (Raw reCirculated Water) temperature. And also the temperature is affected by sea water temperature. Unfortunately, sea water temperature is gradually increasing by global warming. So it will cause increase of RCW temperature inevitably. There is no assessment result of moderator subcooling with increasing RCW temperature even if it is important problem. Therefore, sensitivity analysis is performed to give information about the relation between RCW temperature and moderator subcooling in the present study. The moderator subcooling margin has to be ensured to establish the moderator heat removal when Large LOCA with LOECI and Loss of Class IV Power occurs. However, sea water temperature is increasing gradually due to global warming. So it is necessary that sensitivity analysis of RCW temperature on the moderator subcooling margin to estimate the availability of the moderator heat removal. In the present paper, the moderator subcooling analysis is performed using the same methodology and assumptions except for RCW temperature used in FSAR Large LOCA PART F.

  13. Sensitivity Analysis of RCW Temperature on the Moderator Subcooling Margin for the LBLOCA of Wolsong NPP Unit 1

    International Nuclear Information System (INIS)

    Seo, Si Won; Kim, Jong Hyun; Choi, Sung Soo; Kim, Sung Min

    2016-01-01

    Moderator subcooling margin has been analyzed using the MODTURC_CLAS code in the Large LOCA FSAR PARTs C and F. Performance of moderator heat exchangers depends on RCW (Raw reCirculated Water) temperature. And also the temperature is affected by sea water temperature. Unfortunately, sea water temperature is gradually increasing by global warming. So it will cause increase of RCW temperature inevitably. There is no assessment result of moderator subcooling with increasing RCW temperature even if it is important problem. Therefore, sensitivity analysis is performed to give information about the relation between RCW temperature and moderator subcooling in the present study. The moderator subcooling margin has to be ensured to establish the moderator heat removal when Large LOCA with LOECI and Loss of Class IV Power occurs. However, sea water temperature is increasing gradually due to global warming. So it is necessary that sensitivity analysis of RCW temperature on the moderator subcooling margin to estimate the availability of the moderator heat removal. In the present paper, the moderator subcooling analysis is performed using the same methodology and assumptions except for RCW temperature used in FSAR Large LOCA PART F.

  14. STEAM GENERATOR TUBE INTEGRITY ANALYSIS OF A TOTAL LOSS OF ALL HEAT SINKS ACCIDENT FOR WOLSONG NPP UNIT 1

    Directory of Open Access Journals (Sweden)

    HEOK-SOON LIM

    2014-02-01

    Full Text Available A total loss of all heat sinks is considered a severe accident with a low probability of occurrence. Following a total loss of all heat sinks, the degasser/condenser relief valves (DCRV become the sole means available for the depressurization of the primary heat transport system. If a nuclear power plant has a total loss of heat sinks accident, high-temperature steam and differential pressure between the primary heat transport system (PHTS and the steam generator (SG secondary side can cause a SG tube creep rupture. To protect the PHTS during a total loss of all heat sinks accident, a sufficient depressurization capability of the degasser/condenser relief valve and the SG tube integrity is very important. Therefore, an accurate estimation of the discharge through these valves is necessary to assess the impact of the PHTS overprotection and the SG tube integrity of the primary circuit. This paper describes the analysis of DCRV discharge capacity and the SG tube integrity under a total loss of all heat sink using the CATHENA code. It was found that the DCRV's discharge capacity is enough to protect the overpressure in the PHTS, and the SG tube integrity is maintained in a total loss of all heat accident.

  15. Steam Generator Tube Integrity Analysis of A Total Loss of all Heat Sinks Accident for Wolsong NPP Unit 1

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Heoksoon; Song, Taeyoung; Chi, Moongoo [Korea Htydro and Nuclear Power Co., Ltd., Daejeon (Korea, Republic of); Kim, Seoungrae [Nuclear Engineering Service and Solution, Daejeon (Korea, Republic of)

    2014-02-15

    A total loss of all heat sinks is considered a severe accident with a low probability of occurrence. Following a total loss of all heat sinks, the degasser/condenser relief valves (DCRV) become the sole means available for the depressurization of the primary heat transport system. If a nuclear power plant has a total loss of heat sinks accident, high-temperature steam and differential pressure between the primary heat transport system (PHTS) and the steam generator (SG) secondary side can cause a SG tube creep rupture. To protect the PHTS during a total loss of all heat sinks accident, a sufficient depressurization capability of the degasser/condenser relief valve and the SG tube integrity is very important. Therefore, an accurate estimation of the discharge through these valves is necessary to assess the impact of the PHTS overprotection and the SG tube integrity of the primary circuit. This paper describes the analysis of DCRV discharge capacity and the SG tube integrity under a total loss of all heat sink using the CATHENA code. It was found that the DCRV's discharge capacity is enough to protect the overpressure in the PHTS, and the SG tube integrity is maintained in a total loss of all heat accident.

  16. Steam Generator Tube Integrity Analysis of A Total Loss of all Heat Sinks Accident for Wolsong NPP Unit 1

    International Nuclear Information System (INIS)

    Lim, Heoksoon; Song, Taeyoung; Chi, Moongoo; Kim, Seoungrae

    2014-01-01

    A total loss of all heat sinks is considered a severe accident with a low probability of occurrence. Following a total loss of all heat sinks, the degasser/condenser relief valves (DCRV) become the sole means available for the depressurization of the primary heat transport system. If a nuclear power plant has a total loss of heat sinks accident, high-temperature steam and differential pressure between the primary heat transport system (PHTS) and the steam generator (SG) secondary side can cause a SG tube creep rupture. To protect the PHTS during a total loss of all heat sinks accident, a sufficient depressurization capability of the degasser/condenser relief valve and the SG tube integrity is very important. Therefore, an accurate estimation of the discharge through these valves is necessary to assess the impact of the PHTS overprotection and the SG tube integrity of the primary circuit. This paper describes the analysis of DCRV discharge capacity and the SG tube integrity under a total loss of all heat sink using the CATHENA code. It was found that the DCRV's discharge capacity is enough to protect the overpressure in the PHTS, and the SG tube integrity is maintained in a total loss of all heat accident

  17. SEDRIO/INCORE, an automatic optimal loading pattern search system for PWR NPP reload core using an expert system

    International Nuclear Information System (INIS)

    Xian Chunyu; Zhang Zongyao

    2003-01-01

    The expert knowledge library for Daya Bay and Qinshan phase II NPP has been established based on expert knowledge, and the reload core loading pattern heuristic search is performed. The in-core fuel management code system INCORE that has been used in engineering design is employed for neutron calculation, and loading pattern is evaluated by using of cycle length and core radial power peaking factor. The developed system SEDRIO/INCORE has been applied in cycle 4 for unit 2 of Daya Bay NPP and cycle 4 for Phase II in Qinshan NPP. The application demonstrated that the loading patterns obtained by SEDRIO/INCORE system are much better than reference ones from the view of the radial power peak and the cycle length

  18. Universal power transistor base drive control unit

    Science.gov (United States)

    Gale, Allan R.; Gritter, David J.

    1988-01-01

    A saturation condition regulator system for a power transistor which achieves the regulation objectives of a Baker clamp but without dumping excess base drive current into the transistor output circuit. The base drive current of the transistor is sensed and used through an active feedback circuit to produce an error signal which modulates the base drive current through a linearly operating FET. The collector base voltage of the power transistor is independently monitored to develop a second error signal which is also used to regulate base drive current. The current-sensitive circuit operates as a limiter. In addition, a fail-safe timing circuit is disclosed which automatically resets to a turn OFF condition in the event the transistor does not turn ON within a predetermined time after the input signal transition.

  19. A risk informed safety classification for a Nordic NPP

    International Nuclear Information System (INIS)

    Jaenkaelae, K.

    2002-01-01

    The report describes a study to develop a safety classification proposal or classi- fication recommendations based on risks for selected equipment of a nuclear power plant. The application plant in this work is Loviisa NPP unit 1. The safety classification proposals are to be considered as an exercise in this pilot study and do not necessarily represent final proposals in a real situation. Comparisons to original safety classifications and technical specifications were made. The study concludes that it is possible to change safety classes or safety signifi- cances as considered in technical specifications and in in-service-inspections into both directions without endangering the safety or even by improving the safety. (au)

  20. Status of steam generator tubing integrity at Jaslovske Bohunice NPP

    International Nuclear Information System (INIS)

    Cepcek, S.

    1997-01-01

    Steam generator represents one of the most important component of nuclear power plants. Especially, loss of tubing integrity of steam generators can lead to the primary coolant leak to secondary circuit and in worse cases to the unit shut down or to the PTS events occurrence. Therefore, to ensure the steam generator tubing integrity and the current knowledge about tube degradation propagation and development is of the highest importance. In this paper the present status of steam generator tubing integrity in operated NPP in Slovak Republic is presented

  1. Improved control system power unit for large parachutes

    Science.gov (United States)

    Chandler, J. A.; Grubbs, T. M.

    1968-01-01

    Improved control system power unit drives the control surfaces of very large controllable parachutes. The design features subassemblies for determining control surface position and cable loading, and protection of the load sensor against the possibility of damage during manipulation.

  2. ASSET experience at Paks NPP

    International Nuclear Information System (INIS)

    Szabo, I.

    1997-01-01

    At Paks NPP special attention has been paid to international reviews since the very beginning of operation. Several international teams visited Paks in order to provide independent assessment of plant performance, conditions and safety. Paks NPP Management has the further intention to invite international reviews regularly (yearly) in the future as well. The experience gained during these reviews helped to establish a unified process of preparation for the reviews, performing them and handling the results. The Safety Department is in charge of organization of the whole process. All these reviews have their specific features and they are focused on different areas. The ASSET reviews provides the assessment of plant performance and safety through the analysis of safety significant events, which have occurred at the nuclear power plant. This approach makes this review specific and different from the other ones

  3. ASSET experience at Paks NPP

    Energy Technology Data Exchange (ETDEWEB)

    Szabo, I [Operational Safety Dept., Paks NPP, Paks (Hungary)

    1997-10-01

    At Paks NPP special attention has been paid to international reviews since the very beginning of operation. Several international teams visited Paks in order to provide independent assessment of plant performance, conditions and safety. Paks NPP Management has the further intention to invite international reviews regularly (yearly) in the future as well. The experience gained during these reviews helped to establish a unified process of preparation for the reviews, performing them and handling the results. The Safety Department is in charge of organization of the whole process. All these reviews have their specific features and they are focused on different areas. The ASSET reviews provides the assessment of plant performance and safety through the analysis of safety significant events, which have occurred at the nuclear power plant. This approach makes this review specific and different from the other ones.

  4. Development of specific costs of nuclear power supply from the Dukovany NPP during the plant's 20 years of operation

    International Nuclear Information System (INIS)

    Curda, F.; Krob, P.

    2005-01-01

    The papers focuses particularly on the evaluation of the individual measures taken with a view to achieving reduction in the specific costs and rationalisation of costs, and discusses the impacts of factors such as outsourcing of activities (maintenance, selected services), structural changes at CEZ a. s. utility, and establishment of the Division of Nuclear Power Plants at CEZ. (author)

  5. Nuclear fuel utilization in Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Boyadzhiev, Z; Kharalampieva, Ts; Pejchinov, Ts [Kombinat Atomna Energetika, Kozloduj (Bulgaria)

    1994-12-31

    An assessment of fuel utilization in Kozloduy NPP units 1-6 is made on the basis of operational data obtained for a total of 62 fuel cycles. Basic characteristics of core loading and operation conditions are given. SPPS-1 and BIPR-7 codes are used to calculate assembly-wise power distributions for different full power days of a given cycle and unit. The data are compared with the measured values of these quantities. The analysis performed shows that the core loading option chosen has led to efficient fuel utilization without violation of the nuclear safety criteria. For WWER-440 (Units 1 - 4) this is expressed in effective reduction of the reactor vessel irradiation, maintaining the design duration of the fuel cycles at a reduced number of assemblies by a factor 5 - 5-10%, utilizing fuel with higher enrichment and implementing the 4-year fuel cycle. For WWER-1000 the improvements lead to: adoption of the 3-year fuel cycle utilizing fuel with 4.4% initial enrichment, implementation of improved fuel with a new type of absorbers and more effective low-leakage core loading patterns. 10 tabs., 6 figs., 7 refs.

  6. NPP lifetime philosophy: the transatlantic difference

    International Nuclear Information System (INIS)

    Mowry, Christofer

    1998-01-01

    Fundamental institutional and cultural differences in the transatlantic nuclear power industries, and in particular those between the Nordic countries and the United States, have driven divergent plant life management strategies -strategies resulting in distinctly different plant performance. Recognition of the linkage between three key components of overall Nuclear Power Plant (NPP) performance - yearly O and M costs, safety, and effective plant lifetime -is based on different institutional perspectives. In the Nordic countries, explicit recognition of this linkage has been historically translated into an integrated approach to plant performance. American NPPs, however, have been forced to focus primarily on near term O and M performance and regulatory mandated investment. While Nordic NPPs view capital investment in plant lifetime management and modernization as necessary to avoid declining plant performance and the cost of replacement power, American NPPs exhibit reluctance for such investments due to the difficulty of justifying the associated short-term costs. The diverging histories of two NPPs of the same vintage and design, one in Sweden and one in the United States, exemplify the potential ramifications of these approaches. The Swedish plant continues to operate with excellent performance indicators, while undertaking a comprehensive and long-term modernization program. The American facility is likely to be decommissioned due to unsustainable economic performance. (author)

  7. Unit size limitations in smaller power systems

    International Nuclear Information System (INIS)

    McConnach, J.S.

    1975-01-01

    The developing nations have generally found it an economic necessity to accept the minimum commercial size limit of 600 MWe. Smaller reactor sizes tendered as 'one off' specials carry high specific cost penalties which considerably weaken the competitiveness of nuclear versus conventional thermal plants. The revised IAEA market survey for nuclear power in developing countries (1974 edition) which takes account of the recent heavy escalation in oil prices, indicates a reasonable market for smaller size reactors in the range 150 MWe to 400 MWe, but until this market is approached seriously by manufacturers, the commercial availability and economic viability of smaller size reactors remains uncertain. (orig.) [de

  8. Fuel leak testing performance at NPP Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Slugen, V.; Krnac, S.; Smiesko, I.

    1995-01-01

    The NPP Bohunice VVER-440 fuel leak testing experience are relatively extensive in comparison with other VVER-440 users. As the first Europe NPP was adapted Siemens (KWU) in core-sipping equipment to VVER-440 units and since this time were have done these tests also for NPP Paks (Hungary) and NPP Dukovany (Czech Republic). The occurrence of leaking fuel assemblies in NPP is in the last 5 years relatively stabilised and low. A significant difference can be observed between type V-230 (31 leaks) and type V-213 (1 leak). None of of the indicated leaking fuel assemblies has been investigated in the hot cell. Therefore cannot be confirm the effective causes of leak occurrence. Nevertheless, the fuel failure rate and the performance of leak testing in NPP Bohunice are comparable to the world standard at PWR's. 1 tab., 2 figs., 3 refs

  9. Fuel leak testing performance at NPP Jaslovske Bohunice

    Energy Technology Data Exchange (ETDEWEB)

    Slugen, V; Krnac, S [Slovak Technical Univ., Bratislava (Slovakia); Smiesko, I [Nuclear Powr Plant EBO, Jaslovske Bohuce (Slovakia)

    1996-12-31

    The NPP Bohunice VVER-440 fuel leak testing experience are relatively extensive in comparison with other VVER-440 users. As the first Europe NPP was adapted Siemens (KWU) in core-sipping equipment to VVER-440 units and since this time were have done these tests also for NPP Paks (Hungary) and NPP Dukovany (Czech Republic). The occurrence of leaking fuel assemblies in NPP is in the last 5 years relatively stabilised and low. A significant difference can be observed between type V-230 (31 leaks) and type V-213 (1 leak). None of of the indicated leaking fuel assemblies has been investigated in the hot cell. Therefore cannot be confirm the effective causes of leak occurrence. Nevertheless, the fuel failure rate and the performance of leak testing in NPP Bohunice are comparable to the world standard at PWR`s. 1 tab., 2 figs., 3 refs.

  10. Safety upgrading of Bohunice V1 NPP

    International Nuclear Information System (INIS)

    2001-01-01

    This CD is multimedia presentation of programme safety upgrading of Bohunice V1 NPP. It consist of next chapters: (1) Introductory speeches; (2) Nuclear power plant WWER 440; (3) Safety improvement; (4) Bohunice Nuclear power plants subsidiary; (5) Siemens; (6) REKON; (7) VUJE Trnava, Inc. - Engineering, Design and Research Organisation; (8) Album

  11. Preoperation of Hamaoka Nuclear Power Station Unit No. 4

    International Nuclear Information System (INIS)

    Fukuyo, Tadashi; Kurata, Satoshi

    1994-01-01

    Chubu Electric Power Co. finished preoperation of Hamaoka Nuclear Power Station Unit No. 4 in September, 1993. Although unit 4 has the same reactor design as unit 3, its rated electrical output (1,137MW) is 37MW more than that of unit 3. This increase was achieved mainly by adopting a Moisture Separater Heater in the turbine system. We started preoperation of unit 4 in November 1992 and performed various tests at electrical outputs of 20%, 50%, 75%, and 100%. We finished preoperation without any scram or other major problems and obtained satisfactory results for the functions and performance of the plant. This paper describes the major results of unit 4 preoperation. (author)

  12. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 1. Data related to sites and plants: Paks NPP, Kozloduy NPP. Working material

    International Nuclear Information System (INIS)

    1995-01-01

    The Co-ordinated research programme on the benchmark study for the seismic analysis and testing of WWER-type nuclear power plants was initiated subsequent to the request from representatives of Member States. The conclusions adopted at the Technical Committee Meeting on Seismic Issues related to existing nuclear power plants held in Tokyo in 1991 called for the harmonization of methods and criteria used in Member States in issues related to seismic safety. The Consulltants' Meeting which followed resulted in producing a working document for CRP. It was decided that a benchmark study is the most effective way to achieve the principal objective. Two types of WWER reactors (WWER-440/213 and WWER-1000) were selected as prototypes for the benchmark exercise to be tested on a full scale using explosions and/or vibration generators. The two prototypes are Kozloduy Units 5/6 for WWER-1000 and Paks for WWER-440/213 nuclear power plants. This volume of Working material contains reports on data related to sites and NPPs Paks and Kozloduy

  13. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 1. Data related to sites and plants: Paks NPP, Kozloduy NPP. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The Co-ordinated research programme on the benchmark study for the seismic analysis and testing of WWER-type nuclear power plants was initiated subsequent to the request from representatives of Member States. The conclusions adopted at the Technical Committee Meeting on Seismic Issues related to existing nuclear power plants held in Tokyo in 1991 called for the harmonization of methods and criteria used in Member States in issues related to seismic safety. The Consulltants' Meeting which followed resulted in producing a working document for CRP. It was decided that a benchmark study is the most effective way to achieve the principal objective. Two types of WWER reactors (WWER-440/213 and WWER-1000) were selected as prototypes for the benchmark exercise to be tested on a full scale using explosions and/or vibration generators. The two prototypes are Kozloduy Units 5/6 for WWER-1000 and Paks for WWER-440/213 nuclear power plants. This volume of Working material contains reports on data related to sites and NPPs Paks and Kozloduy.

  14. Power Dissipation Challenges in Multicore Floating-Point Units

    DEFF Research Database (Denmark)

    Liu, Wei; Nannarelli, Alberto

    2010-01-01

    , we analyze the impact of power dissipation in floating-point (FP) units and we consider different alternatives in the implementation of FP-division that lead to substantial energy savings. We compare the implementation of division in a Fused Multiply-Add (FMA) unit based on the Newton-Raphson...

  15. Near Regional and Site Investigations of the Temelin NPP Site

    International Nuclear Information System (INIS)

    Prachar, Ivan; Vacek, Jiri; Heralecky, Pavel

    2011-01-01

    The Temelin NPP is worldwide through heated discussion with nuclear energetic opposition. In addition this discussion goes beyond a border of the Czech Republic. On the other side, results of several international supervisions shown that Temelin NPP is fully comparable with the safest nuclear power plants in the world regarding its technical design and safety functions. This presentation deals with the near regional and site investigations of the Temelin NPP Site. It must be noted that although the Temelin site is situated in the area with low seismicity, item of seismicity is a basic argument against Temelin NPP and therefore a detail seismic hazard assessment was performed

  16. Replacement of the computerized control system at NPP under operation

    International Nuclear Information System (INIS)

    Ermolaev, A.D.; Rakitin, I.D.

    1985-01-01

    Reasons and preconditions for replacement of the computerized control systems (CCS) at NPP under operation are consi-- dered. Problems dealing with management of CCS replacement, maintenance of a new CCS as well as NPP personnel training for the new system maintenance are discussed. A necessity of NPP personnel participation in these works in order to adapt CCS to requirements of NPP operation personnel and to initiate the training process is underlined. Replacement of CCS at NPP under operation is associated, as a rule, with obsolescence of old systems not ensuring growing requirements to NPP workability and safety. Principles observed at CCS replacement are reduced, mainly, to the following; maximum utilizatian of existing equipment, metal strUctures, cables, instruments, power supplies, ventilation system minimum of construction works and new communications; the least change of acting panels and boxes; changes in control desks should be introduced on the basis of the analysis of operator actions '

  17. Semiparametric Power Envelopes for Tests of the Unit Root Hypothesis

    DEFF Research Database (Denmark)

    Jansson, Michael

    This paper derives asymptotic power envelopes for tests of the unit root hypothesis in a zero-mean AR(1) model. The power envelopes are derived using the limits of experiments approach and are semiparametric in the sense that the underlying error distribution is treated as an unknown...

  18. Dedicated auxiliary power units for Hybrid Electric Vehicles

    NARCIS (Netherlands)

    Mourad, S.; Weijer, C.J.T. van de

    1998-01-01

    The use of a dedicated auxiliary power unit is essential to utilize the potential that hybrid vehicles offer for efficient and ultra-clean transportation. An example of a hybrid project at the TNO Road-Vehicles Research Institute shows the development and the results of a dedicated auxiliary power

  19. Power quality improvement of unbalanced power system with distributed generation units

    DEFF Research Database (Denmark)

    Hu, Y.; Chen, Zhe; Excell, P.

    2011-01-01

    This paper presents a power electronic system for improving the power quality of the unbalanced distributed generation units in three-phase four-wire system. In the system, small renewable power generation units, such as small PV generator, small wind turbines may be configured as single phase...... and control of the converter are described. Simulation results have demonstrated that the system can effectively correct the unbalance and enhance the system power quality....... generation units. The random nature of renewable power sources may result in significant unbalance in the power network and affect the power quality. An electronic converter system is proposed to correct the system unbalance and harmonics so as to deal with the power quality problems. The operation...

  20. New generation main control room of enhanced safety NPP with MKER reactor

    International Nuclear Information System (INIS)

    Golovanev, V.E.; Gorelov, A.I.; Proshin, V.A.

    1994-01-01

    Russia is planning to begin the gradual substitution RMBK NPP units, whose resources were worked out itself, to NPP units with a 800 MW multiloop boiling water power reactor (MKER-800) enhanced safety at next ten-year period. Main drawbacks of RBMK Reactor were completely removed in design of MKER-800 reactor. Moreover some special decisions were made to give MKER-800 self-safety properties. The proposed design of the MKER-800 enhanced safety reactor is not only fully free from the drawbacks of the RBMK reactors, but also show a number of advantages of channel-type reactors. This Paper presents some preliminary proposals of MCR Design, that developed Research and Development Institute of Power Energy (RDIPE). 6 refs, 2 figs

  1. Radioactive waste management at Cernavoda NPP after 5 years of experience

    International Nuclear Information System (INIS)

    Raducea, D.

    2002-01-01

    Many human activities generate waste but people are worried about those produced in nuclear power plants. Their concern is an unjustified fear toward the hazard from radioactive wastes because any country, which produces electrical power in this way, pays a lot of attention of all relevant parties involved in radioactive waste management. The same policy is applied for Cernavoda NPP. Our concept establishes the general approach required for the collection, handling, conditioning and storage of radioactive waste from Cernavoda NPP Unit 1 and will be ready for expansion when other units are brought into service. Among others, a major objective is to reduce the radioactive waste production and volume. In this regard we are trying to improve as much as possible our procedures and radioactive wastes management. Further, it will be presented the radioactive waste management, including the improvements in our program and the future plans.(author)

  2. Safety enhancement concept for NPP of new generation with VVER reactors

    International Nuclear Information System (INIS)

    Bezlepkin, V.; Kukhtevich, I.; Semashko, S.; Svetlov, S.; Solodovnikov, A.

    2004-01-01

    through a fuel pool during accidents accompanied by leaks of primary coolant. Moreover, if this is a case, no detention of corium within RPV is guaranteed during severe accidents. Anyhow, many of the useful properties of other passive systems adopted for NPP VVER-640 design may be used in high-powered NPP designs. In the course of selecting the configuration of NPP VVER-1500, it is advisable to take the latest NPP VVER-1000 designs as a basis. The design is proposed to be developed on a stage-by-stage scheme. In this context, the first stage would include the elaboration of a design of a prototype power unit on the basis of existing NPP VVER-1000 designs with the supplement of a passive containment heat removal system. Furthermore, the design shall provide for a possibility of implementing additional passive safety systems without drastic changes in the design. During further stages, it is necessary to finalize and approve a technique for assessment of probabilistic safety indices as regards inter-group common cause failures. The next step is a substantiation of implementation of additional passive safety systems and selection of their properties. Despite of the formidability of problems arising in the course of elaborating new NPP VVER-1500 designs, a holistic analysis of such designs which are under elaboration now both in Russia and abroad, as well as consideration of the latest safety requirements will create a sound basis for advanced technical approaches to safety assurance, thus allowing to reach the best safety indices in the world. (author)

  3. Recent activities in the field of nuclear power plant control and instrumentation in Czechoslovakia

    International Nuclear Information System (INIS)

    Rubek, J.

    1992-01-01

    The report presents a review of Czechoslovak nuclear power plants that are in operation and in the course of construction. The present state of the instrumentation of the newly built NPP's is described, and a special attention is given to work on the control of spatial power distribution in the reactor core of WWER 1000, the first unit to be installed in NPP Temelin. A project of a secondary circuit diagnostic system of this unit is described. (author). 6 refs, 1 tab

  4. High Performance Auxiliary Power Unit Technology Demonstrator.

    Science.gov (United States)

    1980-12-01

    aft bearings 1.13 P3 - Power producer CDP 1.14 DPHE - Lube pressure drop at heat exchanger 1.15 POFP - Load airflow orifice pressure 1.16 DPOFP - Load...P𔃽I -PSI G PEBL -PSIG P2 -PS.IG DPHE -PID POFP -F Iu 0. 022±_ 77. 3478 6o5. 6 4±4 ±8L-. 4852 19. 51-17.4 DPOFP -PSID Ni -,. N2-i -RPM NSATM -FPM...28. 0250 83. 3505 29. 861 1:9. 7680 PGi -PSIG PEBL -PSIG P3 -PSIG DPHE -PSID POFP -PSIG 0. 0100 77. 9199 72.4862 17. 25 ±19. 4122 1= DPOFP -PSID NI

  5. Integrated ageing management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos; Sabransky, Mario

    2013-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  6. Integrated Ageing Management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, J.M.; Marchena, M.H.; Zorrilla, J.R.; Sabransky, M.

    2012-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor twice as big as Atucha I finishing a delayed construction . With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  7. Integrated ageing management of Atucha NPP

    Energy Technology Data Exchange (ETDEWEB)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos, E-mail: ranalli@cnea.gov.ar [Gerencia Coordinacion Proyectos CNEA-NASA, Comision Nacional de Energia Atomica, Buenos Aires (Argentina); Sabransky, Mario, E-mail: msabransky@na-sa.com.ar [Departamento Gestion de Envejecimiento, Central Nuclear Atucha I-II Nucleoelectrica Argentina S.A., Provincia de Buenos Aires (Argentina)

    2013-07-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  8. Power conversion unit for the South African direct cycle HTGR

    International Nuclear Information System (INIS)

    Liebenberg, J.J.

    1997-01-01

    The system parameters chosen to optimise the thermal efficiency of the Eskom PBMR whilst maintaining component simplicity is discussed. Power Conversion Unit components, which are now at a preliminary design stage comprise a precooler, two turbo units consisting of a turbine driven compressor, recuperator and a power turbine, driving an alternator. Design aspects of every component is mentioned and the inventory method of poorer control is explained with reference to start-up and and shut-down events, the system an effective load following device, down to 4% of full power. Application of the same design principles for HTGRs smaller than 25 MWe is discussed. (author)

  9. Power supply control units for APS ring magnets

    International Nuclear Information System (INIS)

    Despe, O.D.

    1990-01-01

    The APS storage ring (1104 meters) is divided into 40 sectors. Each sector has 38 magnet coils in five magnet bases. Every alternate sector has an additional quadrupole magnet for skew correction. AR the main dipole magnets, two in each sector are connected in series and fed from one power supply unit. A base is controlled by one power supply control unit (PSCU). Each PSCU is connected to the host computer via a local area network (LAN). This note discusses the hardware configuration of the typical power supply control system used by the APS magnets and the software commands supported by the PSCU

  10. The future of nuclear power in the United Kingdom

    International Nuclear Information System (INIS)

    Jones, P.M.S.

    1990-01-01

    The arguments that have been put forward in the United Kingdom to justify the contention by its opponents that nuclear power should not be seen as a safe, economic, strategically desirable and environmentally attractive energy source are examined. Counter arguments are presented to support the belief that these are wholly wrong. In the short to medium term, however, economic and political considerations suggest that the prospects for nuclear power in the United Kingdom are not optimistic. The long term evolution of nuclear power is uncertain but it is possible that the security of energy supply, comparative economics and environmental attractions associated with nuclear power will become more apparent and work in its favour eventually. The conviction is expressed that, by the middle of the next century, the United Kingdom will be reaping the benefits of the fast reactor on a significant scale. (UK)

  11. Nuclear fuel operation at Balakovo NPP

    International Nuclear Information System (INIS)

    Morozov, A.

    2015-01-01

    The presentation addressed the positive experience of the TVS-2M assemblies implementation at Balakovo NPP in 18 month fuel cycles, at uprated power (104%) and the usage of the axial profiled Gd-rods in order to minimize the power peaking factors and linear heat rate in the upper part in some of the fuel rods. The results of the test operation of fuel rods with different claddings, made by E110M, E125 and E635M alloys at Balakovo NPP were also provided. The recently observed problem with the “white crust” on the cladding surfaces was also discussed

  12. Development and application of automatic frequency and power control systems for large power units

    Energy Technology Data Exchange (ETDEWEB)

    V.A. Bilenko; A.D. Melamed; E.E. Mikushevich; D.Y. Nikol' skii; R.L. Rogachev; N.A. Romanov [ZAO Interavtomatika (Interautomatika AG), Moscow (Russian Federation)

    2008-07-01

    We describe the results of work carried out at ZAO Interavtomatika on the development and putting into use of a system for automatically controlling the frequency and power output of large coal-fired power units involving the retrofitting of the turbine's hydraulic automatic control system. Certificates affirming conformity to the Standard of the System Operator Centralized Dispatching Administration (SO-CDA) have been received for eight power units as an outcome of these efforts.

  13. The hydroelectric power market in the United States

    International Nuclear Information System (INIS)

    2002-01-01

    The second-largest producer of hydroelectric power in the world is the United States, right after Canada. In the United States, 7.1 per cent of net electricity generation was attributed to hydroelectric power in 2000, which totalled 269 terawatt hours (TWh). Aging facilities, outdated technology in some facilities, a cumbersome licensing process, and increasing environmental demands from interest groups for the preservation of river systems and surrounding wildlife challenge the industry. Pacific Coast states, especially California, were faced with electric power shortages during the summer of 2001, due to low market prices, high power usage among consumers and drought. The problems with the deregulation of the electricity market were brought to light by these shortages. Legislation to restructure the electric power industry in 25 states had not been enacted as of January 2002. The purchase of more power from both Canada and the Mexico is being considered by the government of the United States, as is the creation of a national power grid to allow for power transmission throughout the country. The Canada-United States energy trade might be affected by such a move, and result in project construction opportunities for Canadian companies. Renewable energy sources must be responsible for the generation of 10 per cent of power generation levels by 2020, on a gradual basis as mandated by law. By 2005, New York City must purchase 10 per cent of its power from renewable energy sources, reaching 20 per cent by 2010. The repair and replacement of aging dam equipment, the development of advanced turbine technology to protect fish stocks and water quality, dam removal, the construction of power lines are all opportunities open to Canadian companies. 60 refs., 5 tabs

  14. Proceedings of the joint WANO/OECD-NEA workshop on pre-stress loss in NPP containments

    International Nuclear Information System (INIS)

    1997-01-01

    This joint WANO/OECD-NEA workshop on pre-stress loss in NPP containments started with Opening Remarks (by OECD and EDF) and two presentations on 'Creep and Shrinkage of Concrete: Physical Origins, Practical Measurements', and 'Past, Present and Future Techniques for Predicting Creep and Shrinkage of Concrete'. It was then followed by papers and presentations from 12 countries, which titles are: Assessment of Creep Methodologies for Predicting Prestressing Forces Losses in Nuclear Power Plant Containments; Prestress Behaviour in Belgian NPP Containments; Presentation of Gentilly 2 NPP Containment (abstract only); Containment Structure Monitoring and Prestress Losses; Experience from Daya Bay Nuclear Power Plant (China); Prestress losses in NPP containments - the EDF experience; Prestress Force Monitoring on the THTR Prestressed Concrete Reactor Vessel During 19 Years; NPP Containment Design: Evolution and Indian Experience; In-Service Inspections and R and D of PCCVs in Japan; Comparison of Grouted and Un-grouted Tendons in NPP Containments; Prestress Losses in Containment of VVER 1000 Units; Prestressing in Nuclear Power Plants; Anchor Lift-off Measuring System for 37 T 15 Tendons; Monitoring of Stressed-Strained State and Forces in Reinforcing Cables of Prestressed Containment Shells of Nuclear Power Plants; Long-Term In-Service Monitoring of Pre-stressing in Magnox Pre-stressed Concrete Pressure Vessels; The Measurement of Un-bonded Tendon Loads in PCPV and Primary Containment Buildings; The Long Term In-service Performance of Corrosion Protection to Prestressing Tendons in AGR Prestressed Concrete Pressure Vessels; Prestress Force Losses in Containments of U.S. Nuclear Power Plants. Discussions and a synthesis are also presented

  15. VUJE capabilities for participation in the development of Slovak power sector

    International Nuclear Information System (INIS)

    Liska, P.

    2004-01-01

    In this presentation author deals with VUJE Trnava, Inc. capabilities for participation in the development of Slovak power sector. It is concluded that VUJE supports the completion of Mochovce units 3 and 4 as the most effective option; VUJE calls of the Slovak government to revive negotiations on a revision of a commitment to close V1 units Bohunice NPP in 2006 or 2008 respectively; VUJE is prepared to be an important participant in supply system for Mochovce NPP Units 3 and 4

  16. Efforts to perform safe and efficient decommissioning for Tsuruga Power Station Unit 1

    International Nuclear Information System (INIS)

    Saito, Shiro; Yamauchi, Toyoaki; Austin, Colin R.

    2017-01-01

    Tsuruga Power Station Unit-1 (Tsuruga-1) started commercial operation in March 1970, and the decision to terminate operation was made in 2015. In April 2016, JAPC signed an agreement with Energy Solutions (ES) on strategic cooperation for domestic D and D projects for introduction of successful international experiences. As a first step in this cooperation, D and D know-how developed by ES in the US is being applied to Tsuruga-1 with verifying its applicability to domestic D and D projects. One of the efforts is human resource development. JAPC has also started introduction of ES's project management method to the Tsuruga-1 project for solid project management and the base line is currently being prepared. Regarding the waste disposal paths, application document of approval for measurement and evaluation of clearance material was submitted in September 2016. However the disposal paths for waste are not established in Japan. It is necessary to cooperate with the government, utilities and local stakeholders to establish waste disposal paths. Because it is also important to obtain the understanding from local communities, JAPC and ES will try positively to utilize local companies for D and D works. JAPC and ES believe that their relationship will ensure success of the Tsuruga-1 NPP decommissioning project. (author)

  17. An overview of course offered by the USA, UK and France to support Nuclear Power Program (NPP)

    International Nuclear Information System (INIS)

    Sheriffah Noor Khamseah Al-Idid Syed Ahmad Idid

    2012-01-01

    In her presentation, speaker address a topic on nuclear education that offered by USA, UK and France to support nuclear power program. Her presentation actually assist students that are willing to explore several courses related to nuclear energy and its application. The speaker also explained briefly the impact of major nuclear accidents such as Fukushima that can influence the participation of students to study in these fields. She also outlines several nuclear stake holders and also some activities to support nuclear application such as planning, research, engineering, environmental impact assessment and others. She also explain in detail the needs to develop human capital especially for this field. At the end of her lectures, she tried to suggest several recommendations so that the audients can use in order to review their own strategies and planning for future training and studies. (author)

  18. Polymer electrolyte fuel cell mini power unit for portable application

    Energy Technology Data Exchange (ETDEWEB)

    Urbani, F.; Squadrito, G.; Barbera, O.; Giacoppo, G.; Passalacqua, E. [CNR-ITAE, via Salita S. Lucia sopra Contesse n. 5, 98126 S. Lucia, Messina (Italy); Zerbinati, O. [Universita del Piemonte Orientale, Dip. di Scienze dell' Ambiente e della Vita, via Bellini 25/g, 15100 Alessandria (Italy)

    2007-06-20

    This paper describes the design, realisation and test of a power unit based on a polymer electrolyte fuel cell, operating at room temperature, for portable application. The device is composed of an home made air breathing fuel cell stack, a metal hydride tank for H{sub 2} supply, a dc-dc converter for power output control and a fan for stack cooling. The stack is composed by 10 cells with an active surface of 25 cm{sup 2} and produces a rated power of 15 W at 6 V and 2 A. The stack successfully runs with end-off fed hydrogen without appreciable performance degradation during the time. The final assembled system is able to generate 12 W at 9.5 V, and power a portable DVD player for 3 h in continuous. The power unit has collected about 100 h of operation without maintenance. (author)

  19. NPP service life management

    International Nuclear Information System (INIS)

    Elagin, Yu.P.

    2001-01-01

    Problems of NPP service life management and service life prolongation are reviewed. Methods for the prolongation of the French NPP service life are discussed, priority directions of nuclear block service life management in regard to aging in the context of the European program of investigation into the materials aging are identified. Questions of the provision of the 60 years service life of the Mihama 1 block (Japan) and decision of the problem of the control equipment aging in Great Britain are discussed. Situation with the prolongation of licenses on the NPP operation in the USA and Spain is considered [ru

  20. Knowledge acquisition for nuclear power plant unit diagnostic system

    International Nuclear Information System (INIS)

    Li Xiaodong; Xi Shuren

    2003-01-01

    The process of acquiring knowledge and building a knowledge base is critical to realize fault diagnostic system at unit level in a nuclear power plant. It directly determines whether the diagnostic system can be applied eventually in a commercial plant. A means to acquire knowledge and its procedures was presented in this paper for fault diagnostic system in a nuclear power plant. The work can be carried out step by step and it is feasible in a commercial nuclear power plant. The knowledge base of the fault diagnostic system for a nuclear power plant can be built after the staff finish the tasks according to the framework presented in this paper

  1. Preparation for decommissioning of the Kozloduy Nuclear Power Plant units 1 and 2

    International Nuclear Information System (INIS)

    Delcheva, T.; Ribarski, V.; Demireva, E.

    2006-01-01

    The first decommissioning strategy of units 1 and 2 of Kozloduy NPP (KNPP) stipulated 3 phases: a 5 year phase including the post operation activities and preparation of the safe enclosure (SE); a 35 years SE period, followed by deferred dismantling. 'Updated Decommissioning Strategy for Units 1-4 of Kozloduy NPP' was issued in June 2006. The Updated Strategy is based on the so called 'Continuous Dismantling' Concept. The updated Strategy starts preparatory work earlier and then moves into dismantling work without a significant gap. The aim is to achieve a more optimal distribution of the dismantling activities along the time, saving jobs and the existing knowledge of the plant personnel during the decommissioning, and ensuring smooth and more effective use of financial and human resources and of the available infrastructure for waste treatment. This paper gives general information about the updated strategy and activities required for its implementation. (author)

  2. Automatic control system at the ''Loviisa'' NPP

    International Nuclear Information System (INIS)

    Kukhtevich, I.V.; Mal'tsev, B.K.; Sergievskaya, E.N.

    1980-01-01

    Automatic control system of the Loviisa-1 NPP (Finland) is described. According to operation conditions of Finland power system the Loviisa-1 NPP must operate in the mode of week and day control of loading schedule and participate in current control of power system frequency and capacity. With provision for these requirements NPP is equipped with the all-regime system for automatic control functioning during reactor start-up, shut-down, in normal and transient regimes and in emergency situations. The automatic control system includes: a data subsystem, an automatic control subsystem, a discrete control subsystem including remote, a subsystem for reactor control and protection and overall station system of protections: control and dosimetry inside the reactor. Structures of a data-computer complex, discrete control subsystems, reactor control and protection systems, neutron flux control system, inside-reactor control system, station protection system and system for control of fuel element tightness are presented in short. Two-year experience of the NPP operation confirmed advisability of the chosen volume of automatization. The Loviisa-1 NPP operates successfully in the mode of the week and day control of supervisor schedule and current control of frequency (short-term control)

  3. R and D status for NPP life management in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Ryong [Korea Electric Power Research Institute, Daejeon (Korea, Republic of)

    2009-04-15

    The economical benefits may be achieved by the plant life management (PLiM) as well as structural integrity of the critical components of NPP. Systems, structures and components (SSC) of NPP are designed to have safety margins in design stage, and being operated with operational margins. As the plant gets older and older, however, aging of SSC occurs and some of SSC may be sometimes failed due to the unexpected aging mechanisms in design stage. Most countries which have operated NPP have their own R and D programs to establish proper countermeasures against the aging and degradation of SSC, The well known program are materials reliability program (MRP) and steam generator management program (SGMP) of EPRI. In Korea, we also have our own R and D programs for the plant life management. In this paper, the present status of the R and D programs will be introduced. Long term operation of a nuclear power plant is one of the goals that the plant wants to achieve, which may be possible as long as the plant safety is maintained and the economical benefits is expected. The economical benefits may be achieved by the plant life management (PLiM) activities. Many R and D activities related to PLiM have been carried out and implemented to Korean NPP, Kori Unit 1 and Wolsong Unit 1 in particular, for the long term operation beyond their original design lives. Those activities include PLiM study, PSR, SGMP, MRP, thinned pipe management program, study on dissimilar metal welds, aging monitor etc. With the results of R and D activities, continued operation of Kori Unit 1 was successfully started from January 17, 2008 for next 10 years beyond its design life. It must be a landmark of 30 years history of nuclear power generation in Korea. Subsequently Wolsong Unit 1 is also expected to start its continued operation when the replacement of pressure tubes and feeders are completed in 2009. Many countries have plans to build new reactors or to extend the life of operating plants.

  4. R and D status for NPP life management in Korea

    International Nuclear Information System (INIS)

    Kim, Tae Ryong

    2009-01-01

    The economical benefits may be achieved by the plant life management (PLiM) as well as structural integrity of the critical components of NPP. Systems, structures and components (SSC) of NPP are designed to have safety margins in design stage, and being operated with operational margins. As the plant gets older and older, however, aging of SSC occurs and some of SSC may be sometimes failed due to the unexpected aging mechanisms in design stage. Most countries which have operated NPP have their own R and D programs to establish proper countermeasures against the aging and degradation of SSC, The well known program are materials reliability program (MRP) and steam generator management program (SGMP) of EPRI. In Korea, we also have our own R and D programs for the plant life management. In this paper, the present status of the R and D programs will be introduced. Long term operation of a nuclear power plant is one of the goals that the plant wants to achieve, which may be possible as long as the plant safety is maintained and the economical benefits is expected. The economical benefits may be achieved by the plant life management (PLiM) activities. Many R and D activities related to PLiM have been carried out and implemented to Korean NPP, Kori Unit 1 and Wolsong Unit 1 in particular, for the long term operation beyond their original design lives. Those activities include PLiM study, PSR, SGMP, MRP, thinned pipe management program, study on dissimilar metal welds, aging monitor etc. With the results of R and D activities, continued operation of Kori Unit 1 was successfully started from January 17, 2008 for next 10 years beyond its design life. It must be a landmark of 30 years history of nuclear power generation in Korea. Subsequently Wolsong Unit 1 is also expected to start its continued operation when the replacement of pressure tubes and feeders are completed in 2009. Many countries have plans to build new reactors or to extend the life of operating plants.

  5. Dissemination of Knowledge about NPP Instrumentation and Control Systems

    International Nuclear Information System (INIS)

    Yastrebenetsky, M.

    2016-01-01

    Full text: Instrumentation and control (I&C) systems are the most variable part in the nuclear power plants (NPP) comparatively with any other NPP systems. This statement is connected with the wide use of computers, rapid changes in information technologies, with the appearance of new computer complex electronic components, e.g., field programmable gate arrays (FPGA) and with appropriate point of their insertion into NPP I&C life cycle. The changes in NPP I&C systems require the dissemination of the knowledge about these systems. Lessons after Fukushima accident increase necessity of these actions. The elaboration and following dissemination of this knowledge took place in different directions: • Writing and issue of three new books about NPP I&C systems for specialists and for students which were issued in Ukrainian and USA public houses (the last book was issued in 2014); • Organization of five international scientific technical conferences, devoted to NPP I&C safety problems; • Elaboration of national (Ukrainian) standards and regulations pertaining to safety important NPP I&C systems (the last standard was issued in 2015) and participation in elaboration of international standards; • Lecturing for university students, NPP specialists and I&C designers. These actions in all directions are added to IAEA activity in the area NPP I&C systems (e.g., IAEA NP-T-3.12 “Core Knowledge on I&C systems in NPP”). (author

  6. Improving Size and Power in Unit Root Testing

    DEFF Research Database (Denmark)

    Haldrup, Niels; Jansson, Michael

    A frequent criticism of unit root tests concerns the poor power and size properties that many of such testsexhibit. However, the past decade or so intensive research has been conducted to alleviate these problems and great advances have been made. The present paper provides a selective survey...... of recent contributions to improve upon both size and power of unit root tests and in so doing the approach of using rigorous statistical optimality criteria in the development of such tests is stressed. In addition to presenting tests where improved size can be achieved by modifying the standard Dickey......-Fuller class of tests, the paper presents theory of optimal testing and the construction of power envelopes for unit root tests underdifferent conditions allowing for serial correlation, deterministic components, assumptions regarding the initial condition, non-Gaussian errors, and the use of covariates....

  7. Upgrade of reliability of NPP steam generators by way of improving water-chemical mode of second loop, modernizing and restructuring

    International Nuclear Information System (INIS)

    Fol'tov, Yi.M.

    2004-01-01

    Ukraine's NPPs are equipped with power units and reactors of VVER-type, in which the heat exchange between the first second loop coolants is made through the steam generators (SG), that is not only an important element of NPP heat scheme, but also a barrier for spreading radioactive substances

  8. Power unit-cargo space link in transport

    Directory of Open Access Journals (Sweden)

    Radmilović Zoran R.

    2005-01-01

    Full Text Available This paper deals with transportation technology regarding links between power unit and cargo space. These links can be divided into two groups: rigid and flexible. Rigid link, established between power unit and cargo space, is dominant in maritime and road transport (sea ships and trucks, and occasionally in transport on inland waterways (self- propelled barges. Flexible link is used in the railroad transport (systems with trailers and semi trailers, and in inland waterway transport (push - towing and pulling systems, and combinations of the systems. The main goal of this research is determination of possible link types and organization of the means of transportation.

  9. Inspection of licensed nuclear power plants in the United States

    International Nuclear Information System (INIS)

    Thornburg, H. D.

    1977-01-01

    Inspection of licensed nuclear power plants in the United States is performed by the Office of Inspection and Enforcement (IE), United States Nuclear Regulatory Commission. IE has several key functions : a) Inspection of licensees and investigation of incidents, occurrences and allegations. b) Detection and correction of safety and security problems. c) Enforcement of rules, regulations, and Commission orders. d) Feedback to the industry and others regarding safety experience. e) Informing the public and others. Major enforcement actions and events involving operating power reactors for the past several years will be summarized. (author)

  10. Seismic qualification of civil engineering structures - Temelin NPP

    International Nuclear Information System (INIS)

    Schererova, K.; Holub, I.; Stepan, J.; Maly, J.

    2004-01-01

    Basic information is presented about the input data and methodology used for evaluation of Temelin NPP civil structures. The existing conditions as listed in POSAR report for the two reactor units are considered. The original design of the power plant assumed a lower level of locality seismic hazard, as followed from seismological surveys that where then available. Later the seismic assessment was updated while fully respecting IAEA recommendations and using a minimum value of acceleration in the horizontal direction PGAHOR = 0.1 g at free field level for SL-2. In relation to the new seismic project, new qualification of the structures, components and systems classed as seismic resistance category 1 was carried out. Since the Czech Republic has no specific technical standards for seismic resistance evaluation of nuclear power plants, a detailed methodology was elaborated, comprising principles of seismic resistance evaluation based on IAEA guides and on common practice in countries with advanced nuclear power engineering. (P.A.)

  11. Maintenance training centre at NPP Paks, Hungary

    International Nuclear Information System (INIS)

    Babos, K.

    1996-01-01

    The lecture shows the feature of WWER-440/213 units maintenance, the existing maintenance training system, the necessity of the change in maintenance training system at NPP Paks. The author introduces the would-be maintenance training centre, the training facilities and the main tasks related to the maintenance training. (author)

  12. Modernization of Unit 2 at Oskarshamn NPP- Main Objectives, Experience from Design, Separation of Operational and Nuclear Safety Equipment - Lessons Learned

    International Nuclear Information System (INIS)

    Kanaan, Salah K.

    2015-01-01

    This paper aims to give a picture of Oskarshamn Nuclear Power Plant (OKG) experience from design for one of the biggest modernization project in the world and focuses on what was learned that is specific to robustness of electrical power systems, especially through Fukushima Station Blackout (SBO). The planning for unit 2 at OKG was initiated in 1967 and the plant was completed on time and was synchronized to the grid October 2, 1974 and is of type BWR. Unit 2 was originally on 580 MW. In 1982 a thermal power up-rate was performed, from 1700 MWh to 1800 MWh (106% reactor output). A decision was made to perform a modernization and a new power up-rate to 850 MW and there were several reasons for this decision; New safety regulations from Swedish Radiation Safety Authority (SSM), Ageing of important components and the initial focus was on safety and availability - Project Plant Life Extension (Plex) was established and became the largest nuclear power modernization in the world. The modernization will lead to: - New safety concept with 4 divisions instead for existing 2 with 2 new buildings South Electrical Building (SEB) and North Electrical Building (NEB); - Completely new software - based equipments for monitoring, control and I and C; - New Low Pressure Turbine, new generator and main transformer; - New MCR and simulator; - Compliance with modern reactor safety requirements; - Redundancy, Separation, Diversification, Earthquake; - Reinforcement of existing safety functions; - New Electricity - I and C (electric power incl. reinforced emergency power and control systems); - New buildings for Electricity - I and C; - Reinforcement of existing process systems as well as installation of new ones. Based on studies and good experiences on how to separate the operational and the safety equipment, the project led to a completely new safety concept. The safety concept is based on fully understanding the safety system that shall encompass all of the elements required to

  13. Operating experience of the automatic technological control system at the Kolsk NPP

    International Nuclear Information System (INIS)

    Volkov, A.P.; Ignatenko, E.I.; Kolomtsev, Yu.V.; Mel'nikov, E.F.; Trofimov, B.A.

    1981-01-01

    Briefly reviewed is operating experience of the automatic control systems of the kolsk NPP (KNPP) power units, where measuring technique of the neutron flux ''Iney'', ARM-4 power regulator, automatic turbine start-up system ATS are used. The main shortcomings of the technological process automatic control system (ACS) and ways of their removal are considered. It is noted that the KNPP ACS performs only limited start-up functions of the basic equipment and reactor power control as well as partially protection functions at instant loading drops and switch-off of the main circulating pump [ru

  14. Evaluation of power commissioning of the Mochovce Unit 1 power level up to 100 % Nnom

    International Nuclear Information System (INIS)

    Sarvaic, I.; Mickolci, M.

    1998-01-01

    The document contains an evaluation of the power phase of power commissioning of the Mochovce Unit 1 in the phase up to the power level of 100 % N nom .In the document, the courses and results of tests in this phase of power commissioning are summarized, evaluation of the performance of important systems and equipment of the unit is carried out, and the compliance with Limits and Conditions in the course of the phase is assessed. On this basis, conclusions are drawn and recommendations for the unit to be ready for subsequent phases of the power commissioning. The evaluation was developed by the scientific management of the Mochovce commissioning providing an independent support for the operators for supervising the commissioning tasks from the point of nuclear safety

  15. Integrated framework for the external cost assessment of nuclear power plant accident considering risk aversion: The Korean case

    International Nuclear Information System (INIS)

    Lee, Sang Hun; Kang, Hyun Gook

    2016-01-01

    Recently, the estimation of accident costs within the social costs of nuclear power plants (NPPs) has garnered substantial interest. In particular, the risk aversion behavior of the public toward an NPP accident is considered an important factor when integrating risk aversion into NPP accident cost. In this study, an integrated framework for the external cost assessment of NPP accident that measures the value of statistical life (VSL) and the relative risk aversion (RRA) coefficient for NPP accident based on an individual-level survey is proposed. To derive the willingness to pay and the RRA coefficient for NPP accident risks, a survey was conducted on a sample of 1550 individuals in Korea. The estimation obtained a mean VSL of USD 2.78 million and an RRA coefficient of 1.315. Based on the estimation results in which various cost factors were considered, a multiplication factor of 5.16 and an external cost of NPP accidents of 4.39E−03 USD-cents/kW h were estimated. This study is expected to provide insight to energy policy decision-makers on analyzing the economic validity of NPP compared to other energy sources by reflecting the estimated external cost of NPP accident into the unit electricity generation cost of NPP. - Highlights: •External cost assessment framework for NPP is proposed considering risk aversion. •VSL was derived from WTP for mortality risk reduction from hypothetical NPP accident. •RRA was derived to integrate public risk aversion into external cost of NPP accident. •Individual-level survey was conducted to derive WTP and RRA for NPP accident risk. •The external cost was estimated considering the direct cost factors of NPP accident.

  16. Phasor Measurement Units in the Eastern Danish power system

    DEFF Research Database (Denmark)

    Nielsen, Arne Hejde; Pedersen, Knud Ole Helgesen; Jørgensen, Preben

    2006-01-01

    Technology. After power system events data can be extracted and analyzed offline. The purpose of the project is to do research within various utilizations of PMU data. On 8 January 2005 a severe storm passed Denmark, and wind speeds were so high, that wind turbines disconnected from the transmission grid...... because of their self protection. Nysted offshore wind farm was among the wind power units that disconnected from the grid, and PMU data from that event are analyzed. The case illustrates the close relation between voltages, power flows and voltage phase angles over a wide area. The voltage phase angle...

  17. Experience of Bohunice V-1 NPP

    International Nuclear Information System (INIS)

    Dobik, Dobroslav

    2000-01-01

    Slovakia remains significantly dependent on imports of primary energy sources, which represent as much as 80% of the demand. Of the total consumption of electricity in Slovakia, 40% was generated in nuclear power plant units in 1998. Slovakia operates 6 units with WWER 440 nuclear reactors. Slovakia is the signatory of all important international agreements and conventions in the field of nuclear energy, and its legislation is in an advanced stage of approximation to European Union law. This is a very important aspect, showing Slovakia's approach to nuclear safety. In 1993 Slovakia accepted the commitments of the UN Convention on Climate Changes, including a reduction of greenhouse gases to 1990 levels by the year 2000. Moreover, as an internal target Slovakia has set the reaching of the 'Toronto Objective', i.e. 20% reduction in CO x , emissions through the year 2005 as compared to 1988. In our opinion, this is not possible without nuclear energy. Time has shown, that the political aspects are more powerful, especially if you underestimate their importance over the than the technical ones. In the case of Bohunice V-1 NPP the political aspects were on the following levels: 1. Slovak republic (Czechoslovakia), political changes, decisions of the government; 2. European Union - Agenda 2000, Accession criteria, nuclear safety criteria, EBRD; 3. Austria as a neighbouring country. Starting with year 1990, 23 expert missions took place at Bohunice V-1 NPP by now. The only criteria for further operation should have been Nuclear safety, which is supervised by NRA SR. It was fully in compliance with EU policy, each country is solely responsible for its energy sector and for nuclear energy use. Our satisfaction lasted not too long. Following negotiation with EU on the highest political level, driven by willingness to be invited for negotiation of accession on the Helsinki Summit, the Slovak government decided on September 14th, on Bohunice V-1 Units shutdown in 2006 and 2008

  18. Radioactive source management in Daya Bay NPP

    International Nuclear Information System (INIS)

    Mao Chun Yang

    2000-01-01

    'Small sources causes big accidents' had occurred worldwide many times. Radioactive source management in Nuclear Power Plant in very important for its safety record. This paper introduces the way and experience of radioactive source management in Daya Bay NPP from aspects of clarifying the responsibilities, centralizing the management of high radioactivity sources, work process management and experience feedback etc. (author)

  19. Benchmark analysis of three main circulation pump sequential trip event at Ignalina NPP

    International Nuclear Information System (INIS)

    Uspuras, E.; Kaliatka, A.; Urbonas, R.

    2001-01-01

    The Ignalina Nuclear Power Plant is a twin-unit with two RBMK-1500 reactors. The primary circuit consists of two symmetrical loops. Eight Main Circulation Pumps (MCPs) at the Ignalina NPP are employed for the coolant water forced circulation through the reactor core. The MCPs are joined in groups of four pumps for each loop (three for normal operation and one on standby). This paper presents the benchmark analysis of three main circulation pump sequential trip event at RBMK-1500 using RELAP5 code. During this event all three MCPs in one circulation loop at Unit 2 Ignalina NPP were tripped one after another, because of inadvertent activation of the fire protection system. The comparison of calculated and measured parameters led us to establish realistic thermal hydraulic characteristics of different main circulation circuit components and to verify the model of drum separators pressure and water level controllers.(author)

  20. NPP Krsko natural circulation performance evaluation

    International Nuclear Information System (INIS)

    Segon, Velimir; Bajs, Tomislav; Frogheri, Monica

    1999-01-01

    The present document deals with an evaluation of the natural circulation performance of the Krsko nuclear power plant. Two calculation have been performed using the NPP Krsko nodalization (both similar to the LOBI A2-77 natural circulation experiment) - the first with the present steam generators at NPP Krsko (Westinghouse, 18% plugged), the second with the future steam generators (Siemens, 0% plugged). The results were evaluated using the natural circulation flow map derived in /1/, and were compared to evaluate the influence of the new steam generators on the natural circulation performance. (author)