WorldWideScience

Sample records for northwest power planning

  1. Northwest conservation and electric power plan 1986. Volume I

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    This 20 year plan is prepared in accordance with the Pacific Northwest Electric Power Planning and Conservation Act - Public Law 96-501, of 1980. This Act required the Council to develop and adopt a 20-year electrical power plan for the region with a program to protect, mitigate and enhance the fish and wildlife affected by hydroelectric development in the Columbia River Basin. The plan provides a 25 year history of the regions power development and comments on its unique features and changing nature. Presentations covers problems, solutions and the planning strategy for risk management. The existing electrical power system is discussed along with future electricity needs, generating resources, conservation of resources, regional needs and resources, and the 1986 action plan. Underlying details are provided in Volume II

  2. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

  3. Is long-term planning obsolete? A discussion of integrated resource planning in the Pacific Northwest U.S. and a scenario for its demise

    International Nuclear Information System (INIS)

    Morlan, T.H.

    1995-01-01

    Slides presented at The Power of Change Conference in Vancouver, British Columbia, Canada in April 1995 dealing with integrated resource planning were provided. The creation of the Northwest Power Planning Council and the Northwest Power Act were described, including the goals that the the Act is expected to achieve. The Council's planning innovations were listed including the first regional integrated resource plan, a consistent and comprehensive treatment of demand side resources, and development of risk- averse plans through explicit treatment of uncertain demands. Resource planning analytical framework, modelling approach and resource strategy components were described. Major policy thrusts of the first regional power plan were presented. Factors promoting a competitive power supply industry, characteristics of that industry, and its effects on existing utilities were identified. Implications of integrated resource planning on long-term planning were assessed. A list of yet unanswered questions were appended to stimulate thought and discussion

  4. 1991 Pacific Northwest loads and resources study, Pacific Northwest economic and electricity use forecast

    International Nuclear Information System (INIS)

    1992-01-01

    This publication provides detailed documentation of the load forecast scenarios and assumptions used in preparing BPA's 1991 Pacific Northwest Loads and Resources Study (the Study). This is one of two technical appendices to the Study; the other appendix details the utility-specific loads and resources used in the Study. The load forecasts and assumption were developed jointly by Bonneville Power Administration (BPA) and Northwest Power Planning Council (Council) staff. This forecast is also used in the Council's 1991 Northwest Conservation and Electric Power Plan (1991 Plan)

  5. Evaluation of carrying capacity: Measure 7.1A of the Northwest Power Planning Council's 1994 Fish and Wildlife Program. Report 1 of 4, Final report

    International Nuclear Information System (INIS)

    Neitzel, D.A.; Johnson, G.E.

    1996-05-01

    This report is one of four that the Pacific Northwest National Laboratory (PNNL) staff prepared to address Measure 7.1A in the Northwest Power Planning Council's (Council) Fish and Wildlife Program (Program) dated december 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for development of a study plan based on critical uncertainties and research needs identified during the evaluation. This report deals with the evaluation of carrying capacity. It describes the analysis of different views of capacity as it relates to salmon survival and abundance. The report ends with conclusions and recommendations for studying carrying capacity

  6. Study plan for evaluating carrying capacity: Measure 7.1A of the Northwest Power Planning Council's 1994 Fish and Wildlife Program. Report 2 of 4, Final report

    International Nuclear Information System (INIS)

    Neitzel, D.A.; Johnson, G.E.

    1996-05-01

    This report is one report of four that the Pacific Northwest National Laboratory (PNNL) staff used to address Measure 7.1A in the Northwest Power Planning Council's (Council) fish and Wildlife Program (Program) dated December 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for the development of a study plan based on the critical uncertainties and research needs identified during the evaluation. In the evaluation of carrying capacity the authors concluded that defining capacity and listing the determinants of capacity is not a simple exercise. Capacity is a complex variable among the attributes that all together define salmon performance. To pursue the capacity parameter, that is, a single number or set of numbers that quantify how many salmon the basin or any part of the basin can support, will not lead to the development of a useful study plan. To increase understanding of ecology, carrying capacity, and limiting factors, it is necessary to deal with the complexity of the sustained performance of salmon in the Columbia River Basin. This report describes the elements of a study plan that could be used to increase the understanding of ecology, carrying capacity, and limiting factors that influence salmon survival under current conditions

  7. Global warming: A Northwest perspective

    Energy Technology Data Exchange (ETDEWEB)

    Scott, M.J.; Counts, C.A. (eds.)

    1990-02-01

    The Northwest Power Planning Council convened a symposium in Olympia, Washington, on the subject of global climate change ( the greenhouse effect'') and its potential for affecting the Pacific Northwest. The symposium was organized in response to a need by the Power Council to understand global climate change and its potential impacts on resource planning and fish and wildlife planning for the region, as well as a need to understand national policy developing toward climate change and the Pacific Northwest's role in it. 40 figs., 15 tabs.

  8. Evaluation of Carrying Capacity : Measure 7.1A of the Northwest Power Planning Council`s 1994 Fish and Wildlife Program : Report 1 of 4, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, Duane A.; Johnson, Gary E.

    1996-05-01

    This report is one of four that the Pacific Northwest National Laboratory (PNNL) staff prepared to address Measure 7.1A in the Northwest Power Planning Council's (Council) Fish and Wildlife Program (Program) dated december 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for development of a study plan based on critical uncertainties and research needs identified during the evaluation. This report deals with the evaluation of carrying capacity. It describes the analysis of different views of capacity as it relates to salmon survival and abundance. The report ends with conclusions and recommendations for studying carrying capacity.

  9. Pacific Northwest Electric Power Planning and Conservation Act : Legislative History of the Act to Assist the Electrical Consumers of the Pacific Northwest through use of the Federal Columbia River Power System to Achieve Cost-Effective Energy Conservation : P.L. 96-501, 94 Stat. 2697.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1981-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act became effective when it was signed into law by President Carter on December 5, 1980. This ended a four-year debate over legislation designed to plan and coordinate the region's energy future. This legislative history is an abbreviated version taken from the larger historical file maintained by the BPA Law Library. It is intended to assist BPA personnel and others who are studying the Northwest Power Act and working on its implementation. The documents included were selected for their value in determining what Congress meant in enacting the statute and to provide the researcher with a starting point for further investigation. These documents include: a history of the Act, a chronology of the legislative action leading to passage of the law; a section-by-section analysis of the Act; the Congressional Records of Senate and House debates on the bill and its amendments, and a list of Congressional committee hearings.

  10. Northwest Territories Power Corporation annual report 1991/92

    International Nuclear Information System (INIS)

    1992-06-01

    The Northwest Territories Power Corporation is a crown corporation of the government of the Northwest Territories. The Corporation operates diesel and hydroelectric production facilities to provide utility services on a self-sustaining basis in the Northwest Territories. Total revenue for 1991/92 amounted to $92,872,000 with $84,954,000 coming from the sale of power. Financial statements are presented. 3 figs

  11. Northwest Territories Power Corporation annual report 1992/93

    International Nuclear Information System (INIS)

    1993-06-01

    The Northwest Territories Power Corporation is a crown corporation of the government of the Northwest Territories. The Corporation operates diesel and hydroelectric production facilities to provide utility services on a self-sustaining basis in the Northwest Territories. Total revenue for 1992/93 amounted to $98,327,000 with $90,274,000 coming from the sale of power. Financial statements are presented. 3 figs

  12. Northwest Territories Power Corporation annual report 1999/2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-05-01

    The Northwest Territories Power Corp. is a crown corporation with the responsibility to generate, transform, transmit, distribute, deliver, sell and supply electrical and heat energy throughout the Northwest Territories on a safe, economic and reliable basis. The Corporation distributes electricity directly to the consumer in most of the 52 communities it serves. It also supplies electricity on a wholesale basis to two distributing utilities which retail electricity to customers in Yellowknife and Hay River, Northwest Territories. The Corporation consists of 48 separate power systems and serves a population of 67,000 with a total load of about 90 megawatts. This report presented highlights of the 1999 safety program which included vehicle safety, safe oil transfer and contractor safety. In addition, the report highlighted the restoring of power to Sanikiluaq after the plant was destroyed by fire. Emergency measures were put into effect and power was restored in record time. In 2000, the Corporation received approval for the renewal of three Snare hydro dam licenses. In addition, new plant construction in Clyde River and Paulatuk began in the summer of 1999. The $5 million program to replace the existing cable splices on the 140 km Snare transmission line was also completed. This report also included the company's balance sheets which presented the financial position of the Corporation and the results of its operations and the changes in cash flow for the year. The net income for 1999/2000 would have been $12.1 million, the highest net income in the Corporation's history, if not for the spending of $0.4 million on its Y2K plan, and an allowance of $1 million restructuring costs to allow the Nunavut Territory to operate and manage their own electrical utility. The net earnings therefore, after considering these one-time expenditures for 1999/2000, were $10.7 million, a decrease of $0.8 million from the 1998/1999. tabs., figs.

  13. 1991 Pacific Northwest Loads and Resources Study, Technical Appendix: Volume 1.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-03-01

    This publication provides detailed documentation of the load forecast scenarios and assumptions used in preparing BPA's 1991 Pacific Northwest Loads and Resources Study (the Study). This is one of two technical appendices to the Study; the other appendix details the utility-specific loads and resources used in the Study. The load forecasts and assumption were developed jointly by Bonneville Power Administration (BPA) and Northwest Power Planning Council (Council) staff. This forecast is also used in the Council's 1991 Northwest Conservation and Electric Power Plan (1991 Plan).

  14. 1998 Pacific Northwest Loads and Resources Study: The White Book

    International Nuclear Information System (INIS)

    1998-01-01

    The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to the 1981 regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for inventory planning to determine BPA revenues. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions, including expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. The 1998 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the December 1997 Pacific Northwest Loads and Resources Study

  15. 1998 Pacific Northwest Loads and Resources Study: The White Book.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-12-01

    The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to the 1981 regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for inventory planning to determine BPA revenues. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions, including expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. The 1998 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the December 1997 Pacific Northwest Loads and Resources Study.

  16. Planning for prescribed burning in the inland northwest.

    Science.gov (United States)

    Robert E. Martin; John D. Dell

    1978-01-01

    Fire has historically played a role in forests and ranges of the inland Northwest. This guide has been prepared to help managers understand the role of fire and the potential uses of fire and to plan for fire use in managing these lands. Sections deal with these topics, and steps in planning a prescribed burn are outlined. A sample burning situation illustrates the...

  17. Pacific Northwest National Laboratory Institutional Plan FY 2004-2008

    Energy Technology Data Exchange (ETDEWEB)

    Quadrel, Marilyn J.

    2004-04-15

    This Institutional Plan for FY 2004-2008 is the principal annual planning document submitted to the Department of Energy's Office of Science by Pacific Northwest National Laboratory in Richland, Washington. This plan describes the Laboratory's mission, roles, and technical capabilities in support of Department of Energy priorities, missions, and plans. It also describes the Laboratory strategic plan, key planning assumptions, major research initiatives, and program strategy for fundamental science, energy resources, environmental quality, and national security.

  18. Pacific Northwest National Laboratory institutional plan: FY 1996--2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This report contains the operation and direction plan for the Pacific Northwest National Laboratory of the US Department of Energy. The topics of the plan include the laboratory mission and core competencies, the laboratory strategic plan; the laboratory initiatives in molecular sciences, microbial biotechnology, global environmental change, complex modeling of physical systems, advanced processing technology, energy technology development, and medical technologies and systems; core business areas, critical success factors, and resource projections.

  19. A Comprehensive Approach to Bi-National Regional Energy Planning in the Pacific Northwest

    Energy Technology Data Exchange (ETDEWEB)

    Matt Morrison

    2007-12-31

    The Pacific NorthWest Economic Region, a statutory organization chartered by the Northwest states of Alaska, Washington, Idaho, Montana, and Oregon, and the western Canadian provinces of British Columbia, Alberta, and the Yukon through its Energy Working Group launched a bi-national energy planning initiative designed to create a Pacific Northwest energy planning council of regional public/private stakeholders from both Canada and the US. There is an urgent need to deal with the comprehensive energy picture now before our hoped for economic recovery results in energy price spikes which are likely to happen because the current supply will not meet predicted demand. Also recent events of August 14th have shown that our bi-national energy grid system is intricately interdependent, and additional planning for future capacity is desperately needed.

  20. The intertwining paths of the density managment and riparian buffer study and the Northwest Forest Plan

    Science.gov (United States)

    Kenneth J. Ruzicka; Deanna H. Olson; Klaus J. Puettmann

    2013-01-01

    Initiated simultaneously, the Density Management and Riparian Buff er Study of western Oregon and the Northwest Forest Plan have had intertwining paths related to federal forest management and policy changes in the Pacifi c Northwest over the last 15 to 20 years. We briefl y discuss the development of the Northwest Forest Plan and how it changed the way forest policy...

  1. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 4, Comments and Responses.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This volume of the Initial Northwest Power Act Power Sales Contracts Final Environmental Impact Statement (Final EIS) contains public comments addressing the Initial Northwest Power Act Power Sales Contracts Draft EIS, August 1990 and Bonneville Power Administration`s (BPA) responses. The Introduction provides information about the process BPA follows in addressing these comments. Part I contains a listing of the Alternative Actions evaluated in the Final EIS; Part II is organized by Alternatives and includes summaries of the comments and BPA responses; Part III provides copies of the original comments letters, and, for ease of identification, are coded in the margins according to the alternative(s) addressed.

  2. Evaluation of possible means to stop production of nuclear power in northwest Russia

    International Nuclear Information System (INIS)

    Skaugen, Aud K.

    2007-08-01

    This note illuminates the status and some elements in the Russian efforts on use of nuclear power, with special emphasis on northwest Russia. In addition the report describes an evaluation of the possibilities of Norwegian influence on the nuclear power in northwest Russia and Kola Peninsula

  3. Electricity: Cornerstone of the northwest economy

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    The goal of this Northwest Power Plan is to preserve and enhance valuable assets by identifying the steps that need to be taken to ensure the lowest cost electrical energy future for the Pacific Northwest. With the 1980's the region entered a new age of electrical power, which poses five major new challenges for the region. (1) All new sources of power are much more expensive than the region's existing hydropower system. (2) The region's industries have divergent needs, and the dilemma is that new additions to the power system will raise costs and threaten the traditional industries. (3) The current surplus of electricity is expensive. Today's surplus is made up of coal and nuclear powered systems which are expensive. (4) The surplus is not evenly shared. High growth metropolitan served by investor-owned utilities with fewer resources compared to demand than the publicly-owned utilities. (5) The surplus could disappear quickly, with high growth the region would need new supplies in the next few years. A 25 year history of the Northwest electrical power development is given

  4. Pacific Northwest National Laboratory Institutional Plan FY 2001-2005

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, Darrell R.; Pearson, Erik W.

    2000-12-29

    The Pacific Northwest National Laboratory Institutional Plan for FY 2001-2005 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; managaement procatices and standards; and communications and trust.

  5. Pacific Northwest National Laboratory Institutional Plan FY 2000-2004

    Energy Technology Data Exchange (ETDEWEB)

    Pearson, Erik W.

    2000-03-01

    The Pacific Northwest National Laboratory Institutional Plan for FY 2000-2004 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; management practices and standards; and communications and trust.

  6. Energy Storage for Power Systems Applications: A Regional Assessment for the Northwest Power Pool (NWPP)

    Energy Technology Data Exchange (ETDEWEB)

    Kintner-Meyer, Michael CW; Balducci, Patrick J.; Jin, Chunlian; Nguyen, Tony B.; Elizondo, Marcelo A.; Viswanathan, Vilayanur V.; Guo, Xinxin; Tuffner, Francis K.

    2010-04-01

    Wind production, which has expanded rapidly in recent years, could be an important element in the future efficient management of the electric power system; however, wind energy generation is uncontrollable and intermittent in nature. Thus, while wind power represents a significant opportunity to the Bonneville Power Administration (BPA), integrating high levels of wind resources into the power system will bring great challenges to generation scheduling and in the provision of ancillary services. This report addresses several key questions in the broader discussion on the integration of renewable energy resources in the Pacific Northwest power grid. More specifically, it addresses the following questions: a) how much total reserve or balancing requirements are necessary to accommodate the simulated expansion of intermittent renewable energy resources during the 2019 time horizon, and b) what are the most cost effective technological solutions for meeting load balancing requirements in the Northwest Power Pool (NWPP).

  7. Effectiveness monitoring for the aquatic and riparian component of the Northwest Forest Plan: conceptual framework and options.

    Science.gov (United States)

    Gordon H. Reeves; David B. Hohler; David P. Larsen; David E. Busch; Kim Kratz; Keith Reynolds; Karl F. Stein; Thomas Atzet; Polly Hays; Michael. Tehan

    2004-01-01

    An Aquatic and Riparian Effectiveness Monitoring Plan (AREMP) for the Northwest Forest Plan is intended to characterize the ecological condition of watersheds and aquatic ecosystems. So to determine the effectiveness of the Northwest Forest Plan to meet relevant objectives, this report presents the conceptual foundation of options for use in pilot testing and...

  8. Agony in the Northwest

    International Nuclear Information System (INIS)

    Labella, J.W.

    1982-01-01

    A public power crisis in the Pacific Northwest arose over plans to build five nuclear power plants. This review traces the decisions made by the 23 members of the Washington Public Power Supply System (WPPSS), the Bonneville Power Administration, and 115 other utilities and industrial users, rural cooperatives, and investor-owned utilities during the planning and construction stages to the decision to terminate three plants. The effects of political action committees working for referenda to stop bond issues, suits by rate payers and cooperatives, and other financial problems led to the decision to mothball two units and halt construction of a third, which led to the loss of 6000 construction jobs. Work continues at one site at record levels. The region must submit a cost-effective conservation and renewable resource plan next year that will help to clarify the future of nuclear plants in the affected states

  9. Risk assessment for biodiversity conservation planning in Pacific Northwest forests

    Science.gov (United States)

    Becky K. Kerns; Alan Ager

    2007-01-01

    Risk assessment can provide a robust strategy for landscape-scale planning challenges associated with species conservation and habitat protection in Pacific Northwest forests. We provide an overview of quantitative and probabilistic ecological risk assessment with focus on the application of approaches and influences from the actuarial, financial, and technical...

  10. Watershed restoration, jobs-in-the woods, and community assistance: Redwood National Park and the Northwest Forest Plan.

    Science.gov (United States)

    Christopher E. DeForest

    1999-01-01

    There are many parallels between the 1978 legislation to expand Redwood National Park and the Northwest Forest Plan, which together with the Northwest Economic Adjustment Initiative formed the 1993 Pacific Northwest Initiative. In both situations, the Federal Government sought to promote retraining for displaced workers, to undertake watershed assessment and...

  11. Late-successional forests and northern spotted owls: how effective is the Northwest Forest Plan?

    Science.gov (United States)

    Miles Hemstrom; Martin G. Raphael

    2000-01-01

    This paper describes the late-successional and old-growth forest and the northern spotted owl effectiveness monitoring plans for the Northwest Forest Plan. The effectiveness monitoring plan for late-successional and old-growth forests will track changes in forest spatial distribution, and within-stand structure and composition, and it will predict future trends.

  12. Evaluation of electrical power alternatives for the Pacific Northwest

    Energy Technology Data Exchange (ETDEWEB)

    1977-09-01

    This study evaluates the concept of implementation of large-scale energy conservation to reduce end-use demand for electrical energy as an alternative to the need for continued construction of new power plants to meet projected energy requirements for the Pacific Northwest. In particular, the numerical accuracy, economic feasibility, and institutional impact of a conservation-oriented scenario developed by the Natural Resources Defense Council, Inc., is assessed, relative to the energy forecast prepared by the Pacific Northwest Utilities Conference Commission. The results of this study are presented in four detailed sections following an introductory and summary section: Reconstruction and Numerical Evaluation of Alternative Scenario; Economic Analysis; Institutional Impact; and Impact of New National Energy Policy.

  13. Hydro models and salmon recovery in the northwest

    International Nuclear Information System (INIS)

    Dragoon, K.

    1993-01-01

    Hydro regulation models provide extensive support for analyzing the efficacy of salmon recovery plans in the Northwest. Power planners developed these computer programs to help plan and efficiently operate a large multiple use river system. The models represent physical relationships and operational requirements on the system. They also simulate coordinated system operations for efficient power generation. These models are being pressed into service to provide data for fish recovery plans. They provide important information about hydro system capabilities and responses to recovery programs. However, the models cannot meet all of the analytical needs of fish biologists working toward salmon recovery

  14. Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.

    Science.gov (United States)

    Jonathan. Thompson

    2007-01-01

    The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoring—the systematic observation and measurement of a set...

  15. Nuclear power and ratepayer protest: The Washington Public Power Supply System crisis

    International Nuclear Information System (INIS)

    Sugai, W.H.

    1986-01-01

    In early 1982, the Washington Public Power Supply System (WPPSS) terminated two nuclear projects, triggering an episode of mass ratepayer insurgency throughout the state. In this survey of the crisis, the author analyzes the political and economic conditions that precipitated the protest and examines citizen opposition to the WPPSS nuclear venture between 1976 and 1981. The review of the public initiative campaigns aimed at the Northwest utility establishment by local antinuclear forces and the role of key individuals and organizations involved in anti-KPPSS activism are central to the discussion. By emphasizing the organizational dynamics of citizen opposition, the analysis clarifies the influence of antinuclear protest in bringing about the WPPSS crisis, which is still in litigation over disputed financial and management liability claims. Finally, the author offers insights into the implications of the 1980 Pacific Northwest Electric Power Planning and Conservation Act and the role of the new Northwest Power Planning Council in regional electrical energy planning

  16. 1993 Pacific Northwest Loads and Resources Study, Technical Appendix: Volume 2, Book 1, Energy.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-12-01

    The 1993 Pacific Northwest Loads and Resources Study establishes the Bonneville Power Administration`s (BPA) planning basis for supplying electricity to BPA customers. The Loads and Resources Study is presented in three documents: (1) this technical appendix detailing loads and resources for each major Pacific and Northwest generating utility, (2) a summary of Federal system and Pacific Northwest region loads and resources, and (3) a technical appendix detailing forecasted Pacific Northwest economic trends and loads. This analysis updates the 1992 Pacific Northwest Loads and Resources Study Technical Appendix published in December 1992. This technical appendix provides utility-specific information that BPA uses in its long-range planning. It incorporates the following for each utility (1) Electrical demand firm loads; (2) Generating resources; and (3) Contracts both inside and outside the region. This document should be used in combination with the 1993 Pacific Northwest Loads and Resources Study, published in December 1993, because much of the information in that document is not duplicated here.

  17. Optimal Capacity Proportion and Distribution Planning of Wind, Photovoltaic and Hydro Power in Bundled Transmission System

    Science.gov (United States)

    Ye, X.; Tang, Q.; Li, T.; Wang, Y. L.; Zhang, X.; Ye, S. Y.

    2017-05-01

    The wind, photovoltaic and hydro power bundled transmission system attends to become common in Northwest and Southwest of China. To make better use of the power complementary characteristic of different power sources, the installed capacity proportion of wind, photovoltaic and hydro power, and their capacity distribution for each integration node is a significant issue to be solved in power system planning stage. An optimal capacity proportion and capacity distribution model for wind, photovoltaic and hydro power bundled transmission system is proposed here, which considers the power out characteristic of power resources with different type and in different area based on real operation data. The transmission capacity limit of power grid is also considered in this paper. Simulation cases are tested referring to one real regional system in Southwest China for planning level year 2020. The results verify the effectiveness of the model in this paper.

  18. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  19. Strategic survey framework for the Northwest Forest Plan survey and manage program.

    Science.gov (United States)

    Randy Molina; Dan McKenzie; Robin Lesher; Jan Ford; Jim Alegria; Richard Cutler

    2003-01-01

    This document outlines an iterative process for assessing the information needs for all Northwest Forest Plan (NWFP) survey and manage species, designing and implementing strategic surveys (including field surveys and other information-gathering processes), and analyzing that information for use in the NWFP annual species review and adaptive-management processes. The...

  20. Parent Involvement Activities in School Improvement Plans in the Northwest Region. Summary. Issues & Answers. REL 2008-No. 064

    Science.gov (United States)

    Speth, Timothy; Saifer, Steffen; Forehand, Gregory

    2008-01-01

    This document presents a summary of the larger report, "Parent Involvement Activities in School Improvement Plans in the Northwest Region." Although the No Child Left Behind Act of 2001 (NCLB) spells out parent involvement requirements for schools in need of improvement, the majority of the Northwest Region school improvement plans…

  1. Northwest Hazardous Waste Research, Development, and Demonstration Center: Program Plan

    International Nuclear Information System (INIS)

    1988-02-01

    The Northwest Hazardous Waste Research, Development, and Demonstration Center was created as part of an ongoing federal effort to provide technologies and methods that protect human health and welfare and environment from hazardous wastes. The Center was established by the Superfund Amendments and Reauthorization Act (SARA) to develop and adapt innovative technologies and methods for assessing the impacts of and remediating inactive hazardous and radioactive mixed-waste sites. The Superfund legislation authorized $10 million for Pacific Northwest Laboratory to establish and operate the Center over a 5-year period. Under this legislation, Congress authorized $10 million each to support research, development, and demonstration (RD and D) on hazardous and radioactive mixed-waste problems in Idaho, Montana, Oregon, and Washington, including the Hanford Site. In 1987, the Center initiated its RD and D activities and prepared this Program Plan that presents the framework within which the Center will carry out its mission. Section 1.0 describes the Center, its mission, objectives, organization, and relationship to other programs. Section 2.0 describes the Center's RD and D strategy and contains the RD and D objectives, priorities, and process to be used to select specific projects. Section 3.0 contains the Center's FY 1988 operating plan and describes the specific RD and D projects to be carried out and their budgets and schedules. 9 refs., 18 figs., 5 tabs

  2. Riparian area protection and outdoor recreation: lessons from the Northwest Forest Plan

    Science.gov (United States)

    Patrick Impero Wilson; Troy E. Hall; Linda E. Kruger

    2012-01-01

    The Northwest Forest Plan required the US Forest Service (USFS) to shift its management focus to ecological values rather than the utilitarian ones that had dominated forest policy in the region. This article examines the effects of this shift on the USFS's historic mission to provide recreational access to the region's forests. Focusing on six national...

  3. Northwest Region Clean Energy Application Center

    Energy Technology Data Exchange (ETDEWEB)

    Sjoding, David [Washington State Univ., Pullman, WA (United States)

    2013-09-30

    The main objective of the Northwest Clean Energy Application Center (NW CEAC) is to promote and support implementation of clean energy technologies. These technologies include combined heat and power (CHP), district energy, waste heat recovery with a primary focus on waste heat to power, and other related clean energy systems such as stationary fuel cell CHP systems. The northwest states include AK, ID, MT, OR, and WA. The key aim/outcome of the Center is to promote and support implementation of clean energy projects. Implemented projects result in a number of benefits including increased energy efficiency, renewable energy development (when using opportunity fuels), reduced carbon emissions, improved facility economics helping to preserve jobs, and reduced criteria pollutants calculated on an output-based emissions basis. Specific objectives performed by the NW CEAC fall within the following five broad promotion and support categories: 1) Center management and planning including database support; 2) Education and Outreach including plan development, website, target market workshops, and education/outreach materials development 3) Identification and provision of screening assessments & feasibility studies as funded by the facility or occasionally further support of Potential High Impact Projects; 4) Project implementation assistance/trouble shooting; and 5) Development of a supportive clean energy policy and initiative/financing framework.

  4. Northwest Boreal Landscape Conservation Cooperative strategic plan 2015 - 2025

    Science.gov (United States)

    Markon, Carl; Schroff, Eric

    2016-01-01

    The Northwest Boreal Landscape Conservation Cooperative (NWB LCC) is a voluntary, diverse, self-directed management-science partnership, informing and promoting integrated science, sustainable natural and cultural resource management, and conservation to address impacts of climate change and other stressors within and across ecosystems. The NWB LCC area includes parts of Alaska, Yukon, Northwest Territories, and British Columbia. Our partnership reflects both the broad geographic scope and an extensive array of active and engaged participants including resource management organizations, government representatives, policy makers, Tribes and First Nations, industry leaders, researchers, non-governmental organizations, and research/education institutions. Bringing together diverse partners will help assure the northwest boreal is a functioning, sustainable landscape. We live in an era of profound conservation challenges, including the loss and fragmentation of habitats, genetic isolation, invasive species, and unnatural wildfire. The effects of rapidly changing climate are already evident on the landscape. In these circumstances, it is imperative that natural resource management agencies, science providers, Tribes, First Nations, conservation organizations, and other stakeholders work together to understand the drivers and impacts of landscape change and to determine how best to address those challenges. Further, it is essential that the public and communities receive clear communication about the vision and activities of the NWB LCC. Open public access to NWB LCC activities and products will promote acceptance and support of the science that guides potential changes in management action and conservation strategy. This strategic plan provides a great opportunity for the NWB LCC to share our approach and intentions to the LCC members, collaborators, communities, and the public at large.

  5. Safety assurance in radioactive waste management at nuclear power plants of the Northwest region of Russia

    Energy Technology Data Exchange (ETDEWEB)

    Safonov, Igor

    1999-07-01

    This presentation describes the two large operating nuclear power plants (NPP) in Northwest Russia, the Kola NPP and the Leningrad NPP. The four units at Kola are tank-type pressurised water reactors of 440 MW (electric) while the four Leningrad reactors are 1000 MW (electric) of RBMK type. Gosatomnadzor of Russia regularly conducts so-called target inspections on safety assurance for radioactive waste management at NNP. Among the many items checked during such inspections are the existence and realisation of an action plan for waste reduction, the technical state of equipment and the compliance with previous directions. The management of liquid, solid and gaseous radioactive wastes is described in some detail, and so are the violations revealed at both sites. There is also some discussion of modernisation plans for waste management. It is stated that the ecological impact of the plants is negligible and there is no hazard to people or environment. The presentation concludes with some suggestions for improving the licensing requirements for waste management.

  6. Safety assurance in radioactive waste management at nuclear power plants of the Northwest region of Russia

    International Nuclear Information System (INIS)

    Safonov, Igor

    1999-01-01

    This presentation describes the two large operating nuclear power plants (NPP) in Northwest Russia, the Kola NPP and the Leningrad NPP. The four units at Kola are tank-type pressurised water reactors of 440 MW (electric) while the four Leningrad reactors are 1000 MW (electric) of RBMK type. Gosatomnadzor of Russia regularly conducts so-called target inspections on safety assurance for radioactive waste management at NNP. Among the many items checked during such inspections are the existence and realisation of an action plan for waste reduction, the technical state of equipment and the compliance with previous directions. The management of liquid, solid and gaseous radioactive wastes is described in some detail, and so are the violations revealed at both sites. There is also some discussion of modernisation plans for waste management. It is stated that the ecological impact of the plants is negligible and there is no hazard to people or environment. The presentation concludes with some suggestions for improving the licensing requirements for waste management

  7. Program plan for future regulatory activity in nuclear-power-plant maintenance

    International Nuclear Information System (INIS)

    Badalamente, R.V.

    1982-10-01

    The intent of this paper is to describe the results of a study of nuclear power plant (NPP) maintenance conducted by Battelle's Pacific Northwest Laboratories (PNL) for the Nuclear Regulatory Commission (NRC). The purpose of the study for the NRC was to determine problems affecting human performance in NPP maintenance, pinpoint those which adversely affect public health and safety, review strategies for overcoming the problems, and suggest the direction that regulatory activities should take. Results of the study were presented to the NRC (Division of Human Factors Safety) in the form of a recommended program plan for future regulatory activity in NPP maintenance

  8. Power facility plan and power supply plan of Japan in 1988

    Energy Technology Data Exchange (ETDEWEB)

    Yoshino, Shoji; Makino, Masao

    1988-06-01

    The power facility plan and the power supply plan for 1988 are described. The demand by non-industrial use will grow at an average of 3.8% for the 1986-97 period due to changes in the life style, construction and extension of buildings and increasing use of OA equipment although the power conservation is promoted. The industrial consumption will increase at only 1.2% a year due to the slowed growth and energy saving. As a result, the total demand will be 778,200 million kWh in 1997 with annual growth of 2.4%. The maximum demand will be 151,210 kW in 1997 with annual growth of 2.9%. The annual load rate will decrease to 56.9%, showing a continuously worsening utilization efficiency of power facilities. The development of 29 power units with total capacity of 2,760 MW is planned in 1988 for a stable power supply with a sufficient margin regarding maximum demand. The plan requires the investment of 3,700 billion yen, including the power transmission systems and substations. The power supply plan in 1988 is aimed at the effective operation of facilities and cost reduction by regional management under proper recognition of local characteristics of each power source, while maintaining a stable power supply with specified margins. (1 fig, 11 tabs)

  9. Pacific Northwest National Laboratory’s Climate Resiliency Planning Process and Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Fowler, Kimberly M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Judd, Kathleen S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Brandenberger, Jill M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-02-22

    In 2015, the Pacific Northwest National Laboratory (PNNL) developed its first Climate Resilience Plan for its Richland Campus. PNNL has performed Climate Resilience Planning for the Department of Defense, Nuclear Regulatory Commission, and Department of Energy (DOE) over the past 5 years. The assessment team included climate scientists, social scientists, engineers, and operations managers. A multi-disciplinary team was needed to understand the potential exposures to future changes at the site, the state of the science on future impacts, and the best process for “mainstreaming” new actions into existing activities. The team uncovered that the site’s greatest vulnerabilities, and therefore priorities for climate resilience planning, are high temperature due to degraded infrastructure, increased wildfire frequency, and intense precipitation impacts on stormwater conveyance systems.

  10. The relative impact of harvest and fire upon landscape-level dynamics of older forests: Lessons from the Northwest Forest Plan

    Science.gov (United States)

    Sean P. Healey; Warren B. Cohen; Thomas A. Spies; Melinda Moeur; Dirk Pflungmacher; M. German Whitley; Michael Lefsky

    2008-01-01

    Interest in preserving older forests at the landscape level has increased in many regions, including the Pacific Northwest of the United States. The Northwest Forest Plan (NWFP) of 1994 initiated a significant reduction in the harvesting of older forests on federal land. We used historical satellite imagery to assess the effect of this reduction in relation to: past...

  11. Columbia River system operation review: Final environmental impact statement. Appendix R, Pacific Northwest Coordination agreement (PNCA)

    International Nuclear Information System (INIS)

    1995-11-01

    Currently, the Federal government coordinates the planning and operation of the Federal Columbia River Power System (FCRPS) with projects owned and operated by the region's non-Federal hydrogenerating utilities pursuant to the Pacific North-west Coordination Agreement (PNCA). The Bureau of Reclamation (Reclamation), the Corps of Engineers (Corps), and the Bonneville Power Administration (BPA) are parties to the PNCA on behalf of the government of the United States. The PNCA is a complex agreement that provides an opportunity for the region's power producers to maximize the power system's reliability and economy while meeting their multiple-use objectives. The PNCA does not dictate the operation of the resources it coordinates. It is essentially an accounting mechanism that exchanges the power produced among the parties in order to improve the reliability of the system and reduce regional power costs. Project owners retain complete autonomy to operate as needed to meet their multiple-use requirements. The PNCA was executed in 1964 as an important component of regional plans to maximize the Northwest's hydro resource capability. Maximization also included the development of storage projects on the Columbia River in Canada pursuant to the terms of the 1964 Columbia River Treaty. Because of the link between power coordination and Treaty issues, the current parties to the PNCA, currently are contemplating entering into a replacement or renewed power coordination agreement. Because the power coordination agreement is a consensual arrangement, its ultimate provisions must be acceptable to all of its signatories. This Appendix R to the Final Environmental Impact Statement of the Columbia River System is a presentation of the Pacific North-west Coordination Agreement

  12. Climate change implications for wind power resources in the Northwest United States

    International Nuclear Information System (INIS)

    Sailor, David J.; Smith, Michael; Hart, Melissa

    2008-01-01

    Using statistically downscaled output from four general circulation models (GCMs), we have investigated scenarios of climate change impacts on wind power generation potential in a five-state region within the Northwest United States (Idaho, Montana, Oregon, Washington, and Wyoming). All GCM simulations were extracted from the standardized set of runs created for the Intergovernmental Panel on Climate Change (IPCC). Analysis of model runs for the 20th century (20c3m) simulations revealed that the direct output of wind statistics from these models is of relatively poor quality compared with observations at airport weather stations within each state. When the GCM output was statistically downscaled, the resulting estimates of current climate wind statistics are substantially better. Furthermore, in looking at the GCM wind statistics for two IPCC future climate scenarios from the Special Report on Emissions Scenarios (SRES A1B and A2), there was significant disagreement in the direct model output from the four GCMs. When statistical downscaling was applied to the future climate simulations, a more coherent story unfolded related to the likely impact of climate change on the region's wind power resource. Specifically, the results suggest that summertime wind speeds in the Northwest may decrease by 5-10%, while wintertime wind speeds may decrease by relatively little, or possibly increase slightly. When these wind statistics are projected to typical turbine hub heights and nominal wind turbine power curves are applied, the impact of the climate change scenarios on wind power may be as high as a 40% reduction in summertime generation potential. (author)

  13. Proceedings of the Northwest regional energy conference

    Energy Technology Data Exchange (ETDEWEB)

    Denman, A S; Comstock, D R [eds.

    1978-12-01

    The conference was directed toward two main objectives. First, a major portion of the proceedings were to focus on the policies, programs, and priorities of the new US DOE, and their relationships to the Pacific Northwest region. Second, the conference was to explore specific energy issues of regional significance and provide an opportunity for regional feedback on energy policies. The 10 sessions of the conference are Keynote Session: Congress, and the National Energy Plan Sen. Henry Jackson; National Perspectives on Energy Issues (I): An Overview of the NEP, Programs and Priorities of DOE (Alvin Alm and NEP - Conservation and Solar Applications (Don Beattie); and Luncheon address - Alaska Energy Issues (Robert LeResche); National Perspectives on Energy Issues (II): Utility Rate Reform - National Provisions and Relationships to the Pacific Northwest (David Bardin) and Technology for Energy and Long Term Short Alternatives (Robert Thorne); Concurrent Interest Group Sessions: State and Local Roles in Energy Planning and Decision-Making and Industry and University Roles in DOE Research and Programs; Banquet address. The US Energy Future (James Schlesinger); Regional Perspectives on Energy Issues: DOE-X - Organization and Response to Regional Needs (Randall Hardy). What Comes After Number 13 (Sterling Munro), Hanford 1978 (Alex Fremling), and Low Head Hydro and Geothermal (Richard Wood); Lucheon address - The Washington Perspective on Energy (Dixie Lee Ray); Regional Power Planning (Panel); and Conference Wrap Up Session. (MCW)

  14. Planning for a soft landing : non-renewable resource development and community infrastructure in the Northwest Territories

    International Nuclear Information System (INIS)

    2006-02-01

    This paper provided a high-level overview of research related to the boom and bust cycle of resource-based economic development and community infrastructure in the north, particularly in the Northwest Territories. The paper focused on what is known and on knowledge gaps that needed to be filled in each of 3 theme areas for an experts workshop on northern communities. The themes that were discussed at the workshop and in this paper were: the connections between non-renewable resources development and community infrastructure in the north; planning for resource development; and strategies for moving ahead and putting ideas into practice. The paper discussed the objectives of the research and discussed findings under each of the 3 themes. Topics discussed included: changes in the infrastructure mix; infrastructure and climate change; infrastructure financing; uncertainty; knowledge; planning tools; stakeholder participation; and measuring and monitoring planning implementation. Data availability was also discussed along with funding mechanisms, technological innovations and community capacity building. It was concluded that strategies for dealing with the boom-induced infrastructure challenges facing communities in the Northwest Territories should focus on making more creative use of available funding; promoting technical innovation; and improving maintenance capacity at the community level. 62 refs

  15. Development of in-service inspection plans for nuclear components at the Surry 1 nuclear power station

    International Nuclear Information System (INIS)

    Vo, T.V.; Simonen, F.A.; Doctor, S.R.; Smith, B.W.; Gore, B.F.

    1993-01-01

    As part of the nondestructive evaluation reliability program sponsored by the US Nuclear Regulatory Commission at Pacific Northwest Laboratory, a methodology has been developed for establishing in-service inspection priorities of nuclear power plant components. The method uses results of probabilistic risk assessment in conjunction with the techniques of failure modes and effects analysis to identify and prioritize the most risk-important systems and components for inspection at nuclear power plants. Surry nuclear power station unit 1 was selected for demonstrating the methodology. The specific systems selected for analysis were the reactor pressure vessel, the reactor coolant, the low pressure injection including the accumulators, and the auxiliary feedwater. The results provide a risk-based ranking of components that can be used to establish a prioritization of the components and a basis for developing improved in-service inspection plans at nuclear power plants

  16. Parent Involvement Activities in School Improvement Plans in the Northwest Region. Issues & Answers. REL 2008-No. 064

    Science.gov (United States)

    Speth, Timothy; Saifer, Steffen; Forehand, Gregory

    2008-01-01

    Although the No Child Left Behind Act of 2001 (NCLB) spells out parent involvement requirements for schools in need of improvement, the majority of the Northwest Region school improvement plans reviewed failed to include such provisions. Reported findings include: (1) Despite a wide range of parent involvement practices discussed in legislation…

  17. Delimiting communities in the Pacific Northwest.

    Science.gov (United States)

    Ellen M. Donoghue

    2003-01-01

    The paper presents an approach for delimiting communities in the Northwest Forest Plan (NWFP) region of the Pacific Northwest that responds to the need to assess impacts and issues associated with broad-scale ecosystem management. Census block groups are aggregated to provide an alternative to more commonly used geographic delimitations of communities, specifically...

  18. 1993 Pacific Northwest Loads and Resources Study.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-12-01

    The Loads and Resources Study is presented in three documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The forecasted future electricity demands -- firm loads -- are subtracted from the projected capability of existing and {open_quotes}contracted for{close_quotes} resources to determine whether Bonneville Power Administration (BPA) and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, and additional conservation, contract purchases, or generating resources will be needed to meet load growth. The Pacific Northwest Loads and Resources Study analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resource in addition to the Federal system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. This study presents the Federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1994--95 through 2003--04.

  19. Bringing Power to Planning Research

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2002-01-01

    This article provides an answer to what has been called the biggest problem in theorizing and understanding planning, namely the ambivalence about power found among planning researchers, theorists, and students. The author narrates how he came to work with issues of power. He then gives an example......-rational questions: (1) Where are we going with planning? (2) Who gains and who loses, and by which mechanisms of power? (3) Is this development desirable? (4) What should be done? These questions are exemplified for a specific instance of Scandinavian urban planning. The author finds that the questions...

  20. Bringing Power to Planning Research

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    This article provides an answer to what has been called the biggest problem in theorizing and understanding planning, namely the ambivalence about power found among planning researchers, theorists, and students. The author narrates how he came to work with issues of power. He then gives an example......-rational questions: (1) Where are we going with planning? (2) Who gains and who loses, and by which mechanisms of power? (3) Is this development desirable? (4) What should be done? These questions are exemplified for a specific instance of Scandinavian urban planning. The author finds that the questions...

  1. Combination of AC Transmission Expansion Planning and Reactive Power Planning in the restructured power system

    International Nuclear Information System (INIS)

    Hooshmand, Rahmat-Allah; Hemmati, Reza; Parastegari, Moein

    2012-01-01

    Highlights: ► To overcome the disadvantages of DC model in Transmission Expansion Planning, AC model should be used. ► The Transmission Expansion Planning associated with Reactive Power Planning results in fewer new transmission lines. ► Electricity market concepts should be considered in Transmission Expansion Planning problem. ► Reliability aspects should be considered in Transmission Expansion Planning problem. ► Particle Swarm Optimization is a suitable optimization method to solve Transmission Expansion Planning problem. - Abstract: Transmission Expansion Planning (TEP) is an important issue in power system studies. It involves decisions on location and number of new transmission lines. Before deregulation of the power system, the goal of TEP problem was investment cost minimization. But in the restructured power system, nodal prices, congestion management, congestion surplus and so on, have been considered too. In this paper, an AC model of TEP problem (AC-TEP) associated with Reactive Power Planning (RPP) is presented. The goals of the proposed planning problem are to minimize investment cost and maximize social benefit at the same time. In the proposed planning problem, in order to improve the reliability of the system the Expected Energy Not Supplied (EENS) index of the system is limited by a constraint. For this purpose, Monte Carlo simulation method is used to determine the EENS. Particle Swarm Optimization (PSO) method is used to solve the proposed planning problem which is a nonlinear mixed integer optimization problem. Simulation results on Garver and RTS systems verify the effectiveness of the proposed planning problem for reduction of the total investment cost, EENS index and also increasing social welfare of the system.

  2. Communicative planning as counter-power

    DEFF Research Database (Denmark)

    Elling, Bo

    2017-01-01

    This article presents a theory of communicative planning in which the power of citizens is conceived as a resource in the promotion of long-term planning against the short-term interests of investors in public planning. Its point of departure is the depiction of three planning paradigms – traditi......This article presents a theory of communicative planning in which the power of citizens is conceived as a resource in the promotion of long-term planning against the short-term interests of investors in public planning. Its point of departure is the depiction of three planning paradigms...... – traditional synoptic, incremental and participatory planning – and a critical discussion of different theories within the latter. In the light of this, it is argued that, in practice, planning authorities most often regard public participation as a problem, rather than as a potential. The article dismisses...... this conception and (a) conceptualizes planning on the basis of a Habermasian theory of communicative action and power, (b) shows that the participation of citizens is necessary to secure the inclusion of ethical and aesthetic rationalities in the planning process, and also that (c) citizens may constitute...

  3. Spatial and temporal patterns of forest disturbance and regrowth within the area of the Northwest Forest Plan

    Science.gov (United States)

    Robert E. Kennedy; Zhiqiang Yang; Warren B. Cohen; Eric Pfaff; Justin Braaten; Peder. Nelson

    2012-01-01

    Understanding fine-grain patterns of forest disturbance and regrowth at the landscape scale is critical for effective management, particularly in forests in western Washington, Oregon, and California, U.S., where the policy known as the Northwest Forest Plan (NWFP) was imposed in 1994 over > 8 million ha of forest in an effort to balance environmental and economic...

  4. Department of Energy – Office of Science Pacific Northwest Site Office Environmental Monitoring Plan for the DOE-SC PNNL Site

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, Sandra F.; Meier, Kirsten M.; Barnett, J. Matthew; Bisping, Lynn E.; Poston, Ted M.; Rhoads, Kathleen

    2011-12-21

    The Pacific Northwest Site Office (PNSO) manages the contract for operations at the U.S. Depart¬ment of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site in Richland, Washington. Radiological operations at the DOE-SC PNNL Site expanded in 2010 with the completion of facilities at the Physical Sciences Facility. As a result of the expanded radiological work at the site, the Washington State Department of Health (WDOH) has required that offsite environmental surveillance be conducted as part of the PNNL Site Radioactive Air Emissions License. The environ¬mental monitoring and surveillance requirements of various orders, regulations, and guidance documents consider emission levels and subsequent risk of negative human and environmental impacts. This Environmental Monitoring Plan (EMP) describes air surveillance activities at the DOE-SC PNNL Site. The determination of offsite environmental surveillance needs evolved out of a Data Quality Objectives process (Barnett et al. 2010) and Implementation Plan (Snyder et al. 2010). The entire EMP is a compilation of several documents, which include the Main Document (this text), Attachment 1: Sampling and Analysis Plan, Attachment 2: Data Management Plan, and Attachment 3: Dose Assessment Guidance.

  5. Northwest power gamble: Washington utilities go for broke on nuclear; region's citizens make conservation bid

    International Nuclear Information System (INIS)

    Brummer, J.

    1981-01-01

    The Washington Public Power Supply System (WPPSS) is asking for a reactor construction moratorium in an effort to get fast relief from the Bonneville Power Administration (BPA), which is authorized to guarantee power purchases from new power plants. Supporters of nuclear power plants as well as those of the soft energy path are watching to see how BPA will handle its mandate against acquiring new thermal plants until conservation and renewable energy potentials are exhausted. BPA can subvert the Pacific Northwest Power Act with 20-year contracts based on conventional forecasts despite evidence that new plants are unneeded. There is also evidence that the public rejects the idea of a moral obligation to bail out nuclear power cost overruns at taxpayer expense. The negotiations involve not only WPPSS and BPA, but Moody's Investor Service and environmental groups

  6. Nuclear power programme planning: An integrated approach

    International Nuclear Information System (INIS)

    2001-12-01

    The International Atomic Energy Agency (IAEA) has published material on different policy considerations in the introduction of nuclear power, primarily addressed to top level decision makers in government and industry in Member States. Several Member States and experts recommended to the IAEA to address the aspects of an integrated approach to nuclear power programme planning and to serve as guidance to those countries wishing to embark on a nuclear power programme. As a follow-up, the present publication is primarily intended to serve as guidance for executives and managers in Member States in planning for possible introduction of nuclear power plants in their electricity generating systems. Nuclear power programme planning, as dealt with in this publication, includes all activities that need to be carried out up to a well-founded decision to proceed with a project feasibility study. Project implementation beyond this decision is not in the scope of this publication. Although it is possible to use nuclear energy as a heat source for industrial processes, desalination and other heat applications, it is assumed in this publication that the planning is aimed towards nuclear power for electricity generation. Much of the information given would, however, also be relevant for planning of nuclear reactors for heat production. The publication was prepared within the framework of the IAEA programme on nuclear power planning, implementation and performance as a joint activity of the Nuclear Power Engineering Section and the Planning and Economic Studies Section (Division of Nuclear Power)

  7. Protecting rare, old-growth, forest-associated species under the Survey and Manage program guidelines of the northwest forest plan.

    Science.gov (United States)

    Randy Molina; Bruce G. Marcot; Robin. Lesher

    2006-01-01

    The Survey and Manage Program of the Northwest Forest Plan (MFP) represents an unparalleled attempt to protect rare, little-known species associated with late-successional and old-growth forests on more than 7.7 million ha of federal lands. Approximately 400 species of amphibians, bryophytes, fungi, lichens, mollusks, vascular plants, arthropod functional groups, and...

  8. 77 FR 73635 - Northwest Storage GP, LLC; Notice of Application

    Science.gov (United States)

    2012-12-11

    ...) 1254 to a proposed 346-megawatt (MW) power plant located within the north industrial area of the Port...] Northwest Storage GP, LLC; Notice of Application Take notice that on November 21, 2012, Northwest Storage GP, LLC. (Northwest) filed with the Federal Energy Regulatory Commission an application under section 7 of...

  9. Building on Two Decades of Ecosystem Management and Biodiversity Conservation under the Northwest Forest Plan, USA

    Directory of Open Access Journals (Sweden)

    Dominick A. DellaSala

    2015-09-01

    Full Text Available The 1994 Northwest Forest Plan (NWFP shifted federal lands management from a focus on timber production to ecosystem management and biodiversity conservation. The plan established a network of conservation reserves and an ecosystem management strategy on ~10 million hectares from northern California to Washington State, USA, within the range of the federally threatened northern spotted owl (Strix occidentalis caurina. Several subsequent assessments—and 20 years of data from monitoring programs established under the plan—have demonstrated the effectiveness of this reserve network and ecosystem management approach in making progress toward attaining many of the plan’s conservation and ecosystem management goals. This paper (1 showcases the fundamental conservation biology and ecosystem management principles underpinning the NWFP as a case study for managers interested in large-landscape conservation; and (2 recommends improvements to the plan’s strategy in response to unprecedented climate change and land-use threats. Twenty years into plan implementation, however, the U.S. Forest Service and Bureau of Land Management, under pressure for increased timber harvest, are retreating from conservation measures. We believe that federal agencies should instead build on the NWFP to ensure continuing success in the Pacific Northwest. We urge federal land managers to (1 protect all remaining late-successional/old-growth forests; (2 identify climate refugia for at-risk species; (3 maintain or increase stream buffers and landscape connectivity; (4 decommission and repair failing roads to improve water quality; (5 reduce fire risk in fire-prone tree plantations; and (6 prevent logging after fires in areas of high conservation value. In many respects, the NWFP is instructive for managers considering similar large-scale conservation efforts.

  10. 1985 consumer segmentation: Assessment of the market for conservation in the Northwest: Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, B.M.; Hattrup, M.P.; Nordi, R.T.; Shankle, S.A.; Ivey, D.L.

    1987-05-01

    This report presents information on consumer attitudes toward conservation, past and intended conservation behaviors, and utility-sponsored conservation program participation levels. The information was collected by means of random telephone surveys of households in Idaho, Oregon, Washington, and Western Montana. Pacific Northwest Laboratory (PNL) conducted analyses of the survey results for the Bonneville Power Administration (BPA) to obtain a better understanding of consumer attitudes and behaviors and to facilitate conservation program planning, design, and marketing.

  11. An initial evaluation of potential options for managing riparian reserves of the Aquatic Conservation Strategy of the Northwest Forest Plan

    Science.gov (United States)

    Gordon H. Reeves; Brian R. Pickard; K. Norman. Johnson

    2016-01-01

    The Aquatic Conservation Strategy (ACS) of the Northwest Forest Plan guides management of riparian and aquatic ecosystems on federal lands in western Oregon, western Washington, and northern California. We applied new scientific findings and tools to evaluate two potential options, A and B, for refining interim riparian reserves to meet ACS goals and likely challenges...

  12. Operating years 1993 through 1995 power purchases

    International Nuclear Information System (INIS)

    1991-12-01

    Bonneville Power Administration (BPA) is obligated to supply electric power to its contractual customers. Based on a forecast of growing customer loads and assuming Critical Period water conditions in the Columbia River Basin, BPA is planning to meet a firm energy deficit during the four operating years (OY) 1992 through 1995, i.e., August 1991 through July 1995. BPA has executed several power purchase agreements to cover the projected OY 1992 deficit. The proposed action is to extend two existing one-year power purchase agreements for an additional three years to cover the four-year Critical Period energy deficit. The extension of these two one-year power purchase agreements would: (1) increase BPA's firm energy load-carrying capability; (2) allow BPA to meet its firm energy contractual commitments over the remaining three years of the four-year Critical Period from August 1, 1992, to July 31, 1995; (3) provide flexibility for BPA's use of hydroelectric resources over the Critical Period; and (4) increase system reliability. Under Critical Period water conditions, absent the proposed action, projected loads would exceed the capability of the Federal power system to serve those loads. The purpose of BPA's proposed action is to assure consistency with its statutory responsibilities, including those found in the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act)

  13. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  14. Pacific Northwest National Laboratory Apatite Investigation at the 100-NR-2 Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-03-28

    This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the 100-NR-2 Apatite Project. The U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory, and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at 100-N would include apatite sequestration as the primary treatment, followed by a secondary treatment. The scope of this project covers the technical support needed before, during, and after treatment of the targeted subsurface environment using a new high-concentration formulation.

  15. Nonlinear integrated resource strategic planning model and case study in China's power sector planning

    International Nuclear Information System (INIS)

    Yuan, Jiahai; Xu, Yan; Kang, Junjie; Zhang, Xingping; Hu, Zheng

    2014-01-01

    In this paper we expand the IRSP (integrated resource strategic planning) model by including the external cost of TPPs (traditional power plants) and popularization cost of EPPs (efficiency power plants) with nonlinear functions. Case studies for power planning in China during 2011–2021 are conducted to show the efficacy of the model. Scenarios are compiled to compare the pathways of power planning under different policies. Results show that: 1) wind power will become competitive with technical learning, but its installation is undesirable when the external cost of coal power is not internalized; 2) the existence of popularization cost will hinder EPPs' (efficiency power plants) deployment and pure market mechanism is not enough to deliver EPPs at socially desirable scale; 3) imposition of progressive emission tax on coal power at an average of 0.15–0.20 RMB/KWh can remedy the market distortion and promote the development of wind power by a significant margin; 4) nuclear power will grow stably when its external cost is set no more than 0.187 RMB per KWh, or 87% of its internal cost. The proposed model can serve as a useful tool for decision support in the process of power planning and policy formulation for national government. - Highlights: • Improve IRSP model by adding nonlinear external and popularization cost. • The model is used to conduct China's power sector planning in 2011–2021. • Simulate the impacts of alternative energy policies on planning results. • The model can be used for joint power sector planning and policy design

  16. Outline of electric power installation plan for fiscal 1981

    International Nuclear Information System (INIS)

    Murakami, Masami

    1981-01-01

    The electric power installation plan for fiscal 1981 was submitted by power companies to the Minister of International Trade and Industry at the end of March. In 1990, the total demand of electric power will be 907.9 billion kWh, and the yearly rate of growth will be about 5%. The peak demand of electric power continues to be acute, and is expected to be 175.74 million kW. In order to supply power so as to always balance the demand, the reserve power of 8 to 10% of the maximum demand is required. According to the submitted plan, the power sources determined already are not sufficient, therefore it was planned to present 61 plants of 11.94 million kW in 1981 and 64 plants of 19.61 million kW in 1982 to the Power Source Development Coordination Council. If the power source development progresses as planned, the adequate rate to reserve is maintained up to 1990, and the stable supply of electric power seems to be secured. However when some delay occurs in the plan, serious obstacle to the demand and supply may arise. This plan fundamentally follows the policy to deversify power sources toward the target of substitute energy supply for petroleum. The power transmission facilities are also strengthened and expanded. The investment plan for fiscal 1981 is shown. (Kako, I.)

  17. Pacific Northwest National Laboratory institutional plan FY 1997--2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    Pacific Northwest National Laboratory`s core mission is to deliver environmental science and technology in the service of the nation and humanity. Through basic research fundamental knowledge is created of natural, engineered, and social systems that is the basis for both effective environmental technology and sound public policy. Legacy environmental problems are solved by delivering technologies that remedy existing environmental hazards, today`s environmental needs are addressed with technologies that prevent pollution and minimize waste, and the technical foundation is being laid for tomorrow`s inherently clean energy and industrial processes. Pacific Northwest National Laboratory also applies its capabilities to meet selected national security, energy, and human health needs; strengthen the US economy; and support the education of future scientists and engineers. Brief summaries are given of the various tasks being carried out under these broad categories.

  18. Highlights of science contributions to implementing the Northwest Forest Plan—1994 to 1998.

    Science.gov (United States)

    Nancy M. Diaz; Richard W. Haynes

    2002-01-01

    During 5 years of research (1994-98) in support of the Northwest Forest Plan (NWFP), Pacific Northwest Research Station scientists and their collaborators have made significant progress in both validating some of the NWFP’s major assumptions and providing research that sets the stage for further evolution of the plan. Studies have provided new information in the areas...

  19. Outline of electric power facility plan in fiscal year 1988

    International Nuclear Information System (INIS)

    1988-01-01

    As to the electric power facility plan in fiscal year 1988, 15 designated electric power enterprises made the notification to the Minister of International Trade and Industry in March, 1988. This outline of the facility plan summarized the plans of 66 enterprises in total, including the plans of municipally operated, joint thermal power and other enterprises in addition to the above 15. In order to ensure the stable supply of electric power, the Ministry of International Trade and Industry considers that it is indispensable to purposefully develop electric power sources and the facilities for distribution along this facility plan. The forecast for fiscal year 1997 is : total electric power demand 778.2 billion kWh, maximum power demand 151.21 million kW, and yearly load factor 56.9 %. This is equivalent to the yearly growth of 2.4 %. In fiscal year 1988, it is planned to present 29 plants of 2760 MW to the Power Source Development Coordination Council. The breakdown is : hydroelectricity 140 MW, thermal power 2010 MW, and nuclear power 610 MW. The Ministry guides electric power enterprises so as to realize the diversification of electric power sources. Also the increase of transmission and transformation facilities, the plan of equipment investment and others are reported. (Kako, I.)

  20. Pre-fire planning for nuclear power plants

    International Nuclear Information System (INIS)

    Talbert, J.H.

    1980-01-01

    Regardless of the fire prevention measures which are taken, plant experience indicates that fires will occur in a nuclear power plant. When a fire occurs, the plant staff must handle the fire emergency. Pre-fire planning is a method of developing detailed fire attack plans and salvage operations to protect equipment from damage due to fire and fire fighting operations. This paper describes the purpose and use of a pre-fire plan to achieve these goals in nuclear power plants

  1. Review of fire behavior during passage of Sandy Lake Fire 13 (NWT) across a Northwest Territories Power Corporation transmission line

    Energy Technology Data Exchange (ETDEWEB)

    Schroeder, D.; Thomasson, J.

    2009-03-15

    The Sandy Lake Fire 13 of July 2008 was an intense forest fire that burned up to and across a power line right-of-way in the Northwest Territories, approximately 160 km northwest of Fort Smith. The terrain in the area is flat and vegetation is characterized by boreal pine and black spruce uplands with black spruce and tamarack in lower areas and adjacent to wetlands. This report documented post fire conditions at locations where the fire crossed the power line. The towers on this line were made from an aluminum alloy and may not have had the same resistance to heat damage as steel towers, more commonly used on major transmission lines. The transmission line was de-energized during the fire. Therefore, the effects of fire on power transmission were not documented. Although the intense wildfire crossed sections of the power line, it did not result in observable damage to the towers or lines. Fire intensity was likely greater than 40,000 kw/m along some sections of the right-of-way. Although the management of the right-of-way may have reduced heat exposure to the transmission towers, it did not stop the fire. Pine mixed with an aspen component greater than 50 per cent had a mitigating effect on fire behaviour. The fire did not result in any immediate damage to the power line infrastructure. It was concluded that the use of power lines for fire operations should consider right-of-way width in order to assess equipment maneuverability, especially around tower guy wires. 5 refs., 1 tab., 12 figs.

  2. 78 FR 50088 - Notice of Availability of the Northwest Colorado Greater Sage-Grouse Draft Resource Management...

    Science.gov (United States)

    2013-08-16

    ... Availability of the Northwest Colorado Greater Sage- Grouse Draft Resource Management Plan Amendment and Draft... Land Management (BLM) has prepared a Northwest Colorado Greater Sage-Grouse Draft Resource Management.../or mailings. ADDRESSES: You may submit comments related to the Northwest Colorado Greater Sage-Grouse...

  3. Danish emergency plan for Barsebaeck Power Plant

    International Nuclear Information System (INIS)

    1981-01-01

    A revised edition of the Danish emergency plan for the Swedish Power Plant Barsebaeck (about 20 km from the Danish Territory) is prepared at the request of Environmental Council in cooperation with police management and civil defense organisations. The plan is valid from October 1981. The emergency plan defines the emergency organization and the provisions to be taken quickly to protect the population if it is exposed to ionizing radiation from release of radioactive effluents as a result of an accident in the Barsebaeck power plant. The emergency plan is based upon Regulation no. 278, June 27, 1963 and Regulation no. 502, October 1, 1974. (EG)

  4. Long-Term Planning in Restructured Power Systems

    International Nuclear Information System (INIS)

    Botterud, Audun

    2003-01-01

    This thesis describes the development of three decision support models for long-term investment planning in restructured power systems. The model concepts address the changing conditions for the electric power industry, with the introduction of more competitive markets, higher uncertainty and less centralised planning. Under these circumstances there is an emerging need for new planning models, also for analyses of the power system in a long-term perspective. The thesis focuses particularly on how dynamic and stochastic modelling can contribute to the improvement of decision making in a restructured power industry. We argue that the use of such modelling approaches has become more important after the introduction of competitive power markets, due to the participants' increased exposure to price fluctuations and economic risk. Our models can be applied by individual participants in the power system to evaluate investment projects for new power generation capacity. The models can also serve as a decision support tool on a regulatory level, providing analyses of the long-term performance of the power system under different regulations and market designs. In Chapter 1, we give a brief introduction to the ongoing development towards restructuring and liberalisation of the electrical power system. A discussion of the operation and organisation of restructured power systems is also provided. In Chapter 2, we look more specifically at different modelling approaches for expansion planning in electrical power systems. We also discuss how the contributions in this thesis compare to previous work in the field of decision support models for long-term planning in both regulated and competitive power systems. In Chapter 3, we develop a power market simulation model based on system dynamics. The advantages and limitations of using descriptive system dynamics models for long-term planning purposes in this context are also discussed. Chapter 4 is devoted to a novel optimisation

  5. Fujian electric system analysis and nuclear power planning

    International Nuclear Information System (INIS)

    Lin Jianwen; Fu Qiang; Cheng Ping

    1994-11-01

    The objective of the study is to conduct a long term electric expansion planning and nuclear power planning for Fujian Province. The Wien Automatic System Planning Package (WASP-III) is used to optimize the electric system. Probabilistic Simulation is one of the most favorite techniques for middle and long term generation and production cost planning of electric power system. The load duration curve is obtained by recording the load data of a time interval into a monotone non-increasing sense. Polynomial function is used to describe the load duration curve (LDC), and this LDC is prepared for probabilistic simulation in WASP-III. WASP-III is a dynamic optimizing module in the area of supply modelling. It could find out the economically optimal expansion plan for a power generating system over a period of up to thirty years, with the constraints given by the planners. The optimum is evaluated in terms of minimum discounted total costs. Generating costs, amount of energy not served and reliability of the system are analyzed in the system expansion planning by using the probabilistic simulation method. The following conclusions can be drawn from this study. Hydro electricity is the cheapest one of all available technologies and resources. After the large hydro station is committed at the end of 1995, more base load power plants are needed in the system. Coal-fired power plants with capacity of 600 MWe will be the most competitive power plants in the future of the system. At the end of the studying period, about half of the stalled capacity will be composed of these power plants. Nuclear power plants with capacity of 600 MWe are suitable for the system after the base load increases to a certain level. Oil combustion units will decrease the costs of the system. (12 tabs., 6 figs.)

  6. Model Watershed Plan; Lemhi, Pahsimeroi, and East Fork of the Salmon River Management Plan, 1995 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Swift, Ralph

    1995-11-01

    Idaho`s Model Watershed Project was established as part of the Northwest Power Planning Council`s plan for salmon recovery in the Columbia River Basin. The Council`s charge was simply stated and came without strings. The tasks were to identify actions within the watershed that are planned or needed for salmon habitat, and establish a procedure for implementing habitat-improvement measures. The Council gave the responsibility of developing this project to the Idaho Soil Conservation Commission. This Model Watershed Plan is intended to be a dynamic plan that helps address these two tasks. It is not intended to be the final say on either. It is also not meant to establish laws, policies, or regulations for the agencies, groups, or individuals who participated in the plan development.

  7. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    International Nuclear Information System (INIS)

    Ballinger, M.Y.; Shields, K.D.

    1999-01-01

    The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R and D) facilities for the Department of Energy on the Hanford Site. According to DOE Order 5400.1, a Facility Effluent Monitoring Plan is required for each site, facility, or process that uses, generates, releases, or manages significant pollutants or hazardous materials. Three of the R and D facilities: the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling and thus individual Facility Effluent Monitoring Plans (FEMPs) have been developed for them. Because no definition of ''significant'' is provided in DOE Order 5400.1 or the accompanying regulatory guide DOE/EH-0173T, this FEMP was developed to describe monitoring requirements in the DOE-owned, PNNL-operated facilities that do not have individual FEMPs. The remainder of the DOE-owned, PNNL-operated facilities are referred to as Balance-of-Plant (BOP) facilities. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R and D. R and D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in the FEMP

  8. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, M.Y.; Shields, K.D.

    1999-04-02

    The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R and D) facilities for the Department of Energy on the Hanford Site. According to DOE Order 5400.1, a Facility Effluent Monitoring Plan is required for each site, facility, or process that uses, generates, releases, or manages significant pollutants or hazardous materials. Three of the R and D facilities: the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling and thus individual Facility Effluent Monitoring Plans (FEMPs) have been developed for them. Because no definition of ''significant'' is provided in DOE Order 5400.1 or the accompanying regulatory guide DOE/EH-0173T, this FEMP was developed to describe monitoring requirements in the DOE-owned, PNNL-operated facilities that do not have individual FEMPs. The remainder of the DOE-owned, PNNL-operated facilities are referred to as Balance-of-Plant (BOP) facilities. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R and D. R and D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in the FEMP.

  9. Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data

  10. Northwest Forest Plan—the first 10 years (1994-2003): status and trends of populations and nesting habitat for the marbled murrelet.

    Science.gov (United States)

    Mark H. Huff; Martin G. Raphael; Sherri L. Miller; S. Kim Nelson; Jim Baldwin

    2006-01-01

    The Northwest Forest Plan (the Plan) is a large-scale ecosystem management plan for federal land in the Pacific Northwest. Marbled murrelet (Brachyramphus marmoratus) populations and habitat were monitored to evaluate effectiveness of the Plan. The chapters in this volume summarize information on marbled murrelet ecology and present the monitoring...

  11. Nuclear power - strategic planning for the next generation

    International Nuclear Information System (INIS)

    Turner, K.H.

    1989-01-01

    Regardless of the real or perceived causes of the nuclear power industry's current difficulties, a number of recent trends-increasing electricity demand, foreign oil dependency, and attention paid to acid rain and the greenhouse effect-taken together, point of the most favorable atmosphere in recent history for nuclear power. Already, serious public discussion of its advantages have begun anew. Thus, the time is ripe to consider the developmental structure of nuclear power's next generation. Although much uncertainty still surrounds the nuclear industry, valuable lessons have been learned, and the evolution of the industry from this point cannot be left to chance. The purpose of this paper is to discuss a framework for nuclear power strategic planning activities. The strategic planning objectives outlined in this paper span issues that affect virtually every aspect of the nuclear power industry. Piecemeal responses to the vagaries of random stimuli will not be adequate. A proactive, integrated, industry-wide initiative-an Institute of Nuclear Power Planning, actively supported by the members of the industry-should be undertaken immediately to fill the strategic planning role. In so doing, the industry will not only be acting in its own best interest but will also be helping the nation realize the real and important benefits of its nuclear power technology

  12. Philippines revises power plans

    Energy Technology Data Exchange (ETDEWEB)

    Hayes, D.

    1988-02-01

    Following an unexpected surge in electricity demand the Philippines has revised its medium term power development programme. The sharp increase in electricity consumption follows three years of slack demand due to civil disturbances before the end of the Macros administration and the election of Corazon Aquino as President in 1986. Originally, the Aquino government's medium term power development plans called for about 500MW of generating capacity to be installed between 1986 and 1992. The three proposed plants were scheduled for commissioning in 1991 and 1992. However, a spurt in power demand growth during the past nine months has caused concern among industrialists that power shortages could occur by the end of the decade. So additional capacity will be installed to prevent an anticipated shortfall in electricity supplies by the early 1990s.

  13. Energy and nuclear power planning study for Armenia

    International Nuclear Information System (INIS)

    2004-07-01

    The Energy and Nuclear Power Planning (ENPP) study for Armenia has been conducted under the technical cooperation programme of the International Atomic Energy Agency (IAEA). The objective of the study was to analyze the electricity demand as part of the total final energy demand in various scenarios of Armenian socioeconomic and technological development, and to develop economically optimized electric generating system expansion plans for meeting the electric power demand, and to assess the role that nuclear energy could play within these optimal programs. The specific objectives of this study were: to define the role that nuclear power could play in the future electricity supply in Armenia, based on a least-cost expansion planning analysis of the country's power system; to analyze the environmental impacts of such a nuclear power development; to evaluate the financial viability of the envisaged nuclear power development program; to train a group of Armenian experts in the use of the IAEA's energy models

  14. Environmental impacts of power plants and transmission lines in power system planning

    International Nuclear Information System (INIS)

    Miracapillo, C.; Moreschini, G.; Rome Univ. 'La Sapienza'

    1992-01-01

    This paper deals with a criterion to assess the environmental impacts of power plants and transmission lines in power system planning. First, the effects of hydro-plants, thermal plants and transmission lines are reviewed. Then, a number of methods for the evaluation of the environmental impacts of civil and industrial plants are described. A new criterion is proposed to introduce the evaluation of the environmental impact and related costs into methods for power system planning. Finally, the criterion is applied to a simple case

  15. Legal consequences of the special development plan 'power plant sites' on regional planning and on guidelines for building plans

    International Nuclear Information System (INIS)

    1978-01-01

    The Special Development Plan 'Power plant sites' was made compulsory by the regulation given by the Land government in Juli 1976. For extending the energy supply system this Special Development Plan intends to provide a sufficient amount of power plant sites suitably located with regard to present and future consumption centres and permitting a cooling by means of river water while safeguarding the interests of water resources policy. The Special Development Plan established in accordance with the articles 25 and 27 of the planning law of the Land lays down that 14 specified areas are to be kept free from utilization purposes which could be opposed to the realization of power plant projects. Thus the securing of these (potential) sites has become an objective of area planning and planning of the Land in the sense of article 5 paragraph 4 of the Federal law on area planning. (orig./HP) [de

  16. Business plan in brief. Draft

    International Nuclear Information System (INIS)

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA's draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA's first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization

  17. Power generation in the 12-th five-year plan

    International Nuclear Information System (INIS)

    Troitskij, A.A.

    1986-01-01

    The state of electric power generation in the 11-th five-year plan is summed up. Perspectives of development of heat and electric power generation in the 12-th five-year plan are considered. Thermal power generation of NPPs in 1990 will increase by a factor of 8.4 as compared with 1975. The NPP development will be mainly realized on the basis of the WWER-1000 type reactors. It is planned to commission fast reactors of up to 800 MW

  18. Investigating the Impact of Shading Effect on the Characteristics of a Large-Scale Grid-Connected PV Power Plant in Northwest China

    Directory of Open Access Journals (Sweden)

    Yunlin Sun

    2014-01-01

    Full Text Available Northwest China is an ideal region for large-scale grid-connected PV system installation due to its abundant solar radiation and vast areas. For grid-connected PV systems in this region, one of the key issues is how to reduce the shading effect as much as possible to maximize their power generation. In this paper, a shading simulation model for PV modules is established and its reliability is verified under the standard testing condition (STC in laboratory. Based on the investigation result of a 20 MWp grid-connected PV plant in northwest China, the typical shading phenomena are classified and analyzed individually, such as power distribution buildings shading and wire poles shading, plants and birds droppings shading, and front-row PV arrays shading. A series of experiments is also conducted on-site to evaluate and compare the impacts of different typical shading forms. Finally, some feasible solutions are proposed to avoid or reduce the shading effect of PV system during operation in such region.

  19. Sustaining the Northwest way of life

    International Nuclear Information System (INIS)

    1991-08-01

    These Discussion Papers are from a number of organizations with a high stake in the future performance of the Bonneville Power Administration. Bonneville solicited papers from other organizations to assure a broaded-based discussion of the topics for the 1991 Programs in Perspective. PIP meetings will be held throughout the Northwest in September. PIP runs on a two-year cycle. The first year is aimed at discussion of broad, strategic issues. The second year evaluates specific program levels for all Bonneville programs and test them for affordability against financial constraints. This year's PIP focuses on strategic-issues discussion. It specifically asks for regional discussion to help put some flesh on the skeleton of Bonneville's own vision for its future: ''Best for the Northwest Through Teamwork B... P... A... The Most Competitive and Socially Responsible Power System in the Nation'' Specific topics are (1) achieving social responsibility and (2) conserving Northwest competitiveness. Bonneville executives chose this vision as a means of directing the organization into and beyond the 1990s. It guides the 3000 plus employees of the agency in their day-to-day operations. By asking for discussion of the terms ''Most Competitive'' and ''Socially Responsible'' in the 1991 PIP, Bonneville intends to better understand the diverse needs of its customers and constituents, and to become of even greater service to the Northwest. The papers are designed to help stimulate thought about the dimensions of the future direction of BPA. Bonneville intends that the real substance of PIP will occur in the meetings themselves. We hope that these papers will provoke new thinking, and that the interchange of views in the meetings will produce new approaches to the issues

  20. An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

    International Nuclear Information System (INIS)

    Elkarmi, Fawwaz; Abu-Shikhah, Nazih; Abu-Zarour, Mohammad

    2010-01-01

    Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems.

  1. An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

    Energy Technology Data Exchange (ETDEWEB)

    Elkarmi, Fawwaz; Abu-Shikhah, Nazih [Al-Ahliyya Amman University, College of Engineering, AA University Post Office, Zip code 19328 (Jordan); Abu-Zarour, Mohammad [NEPCO, Department of Generation Planning, P.O. Box 2310, Amman 11194 (Jordan)

    2010-10-15

    Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems. (author)

  2. The planning of areas near nuclear power stations

    International Nuclear Information System (INIS)

    1977-01-01

    During the past five years national physical planning has been initiated by the Swedish Parliament. Guidelines have been given to the communities how to consider national interests when drawing up local planning and how to produce maps and descriptions of the planning. For the planning of the areas near the nuclear power stations the municipalities have certain guidelines from The Nuclear Power Inspectorate and The National Institute of Radiation Protection. It is advised to keep a low population density near the power plants, to avoid the type of harbour or industry which could have disturbing effects on the power plant and also to avoid to concentrate people, who are difficult to move from the area in case of an accident (i.e., homes for old people, maternity homes and prisons). The plants on the East Coast, Forsmark and Oskarshamn, are located in wooded areas with a very low population density. On the West Coast, near Ringhals and Barsebaeck, the population density is higher, and there is one village with about 2,000 inhabitants, situated at a distance of two (2) km from the Ringhals power plant. The Control Boards are now reluctant to concentrate more people in this village, where schools and shops were earlier planned for 3,000 inhabitants. The building activity near power plants is regulated by law. New buildings are prohibited within a distance of two (2) km from the plants. Some exeptions can be granted by the County Administrative Board after guidance from the Central Board. In a zone reaching 10 kilometers from the power plants there are no regulations by law about new buildings, except the earlier mentioned guidelines from the Central Boards to maintain a low population. (L.E.)

  3. Nuclear power planning and feasibility studies

    International Nuclear Information System (INIS)

    Streeton, D.F.

    1977-01-01

    This lecture will review the basic steps associated with planning the introduction of nuclear power. Areas covered will include power market surveys, energy resources evaluations, potential alternative strategies, organisational factors and implementational requirements. The lecture will then consider the implications and requirements associated with establishing the feasibility of a nuclear project. Among others, aspects of power systems integration, site selection reactor type evaluation, cost and economic analysis, influence of contracting strategies, comparison with alternative power generation solutions, financial impact, etc. will be discussed and reviewed. (HK) [de

  4. Dynamic Integrated Resource Strategic Planning Model: A Case Study of China’s Power Sector Planning into 2050

    Directory of Open Access Journals (Sweden)

    Yan Xu

    2017-07-01

    Full Text Available This paper proposes a Dynamic Integrated Resource Strategic Planning (DIRSP model based on a semi-Markov decision-making process. Considering the policy transfer probability matrix, we discuss the influence of different policy portfolios and input intensity on the timing and scale of low-carbon transition during the power planning process. In addition, we discuss various planning scenarios from a socio-technical system transition perspective. Scenarios are compiled to compare the pathways of power planning in China during 2015–2050 under different policies, including a typical reproduction pathway with unchanged policy that maintains the original coal-dominated technology pathway, a de-alignment/re-alignment pathway where renewable energy power technologies develop from niches to mainstream while the planning time for peak coal power moves ahead in 10–20 years due to subsidies to renewable and carbon tax policy, and the substitution and reconfiguration pathways in which renewable energy technologies compete with coal power in parallel, in which coal power will peak by 2020 while wind power and solar power will realize large-scale development by 2020 and 2030, respectively. Case study on power planning in China indicates that the methodology proposed in our study can enhance our understanding on the low-carbon transition process and the interaction between energy policy and transition pathway.

  5. Collaborative environmental assessment in the Northwest Territories, Canada

    International Nuclear Information System (INIS)

    Armitage, Derek R.

    2005-01-01

    Recent trends in environmental assessment theory and practice indicate a growing concern with collaboration and learning. Although there are few examples of the institutional, organizational, and socio-political forms and processes required to foster this collaboration and learning, the establishment of an environmental planning, management, and assessment regime in Canada's Northwest Territories offers useful insights. Consequently, this paper identifies and examines the institutional, organizational, and socio-political conditions that have encouraged more collaborative forms of environmental assessment practice in the Northwest Territories. Key issues highlighted include: (1) the development of decentralized regulatory organizations more responsive to changing circumstances; (2) strategies for more effective communication and participation of community interests; (3) efforts to build a collaborative vision of economic and social development through region-specific land use plans; (4) the integration of knowledge frameworks; and (5) a concern with the capacity required to encourage effective intervention in the assessment process

  6. Integration of Renewable Generation in Power System Defence Plans

    DEFF Research Database (Denmark)

    Das, Kaushik

    Increasing levels of penetration of wind power and other renewable generations in European power systems pose challenges to power system security. The power system operators are continuously challenged especially when generations from renewables are high thereby reducing online capacity of conven......Increasing levels of penetration of wind power and other renewable generations in European power systems pose challenges to power system security. The power system operators are continuously challenged especially when generations from renewables are high thereby reducing online capacity......, one of them being the North East area with high share of wind power generation.The aim of this study is to investigate how renewable generations like wind power can contribute to the power system defence plans. This PhD project “Integration of Renewable Generation in Power System Defence Plans...

  7. EHV AC undergrounding electrical power performance and planning

    CERN Document Server

    Benato, Roberto

    2014-01-01

    Analytical methods of cable performance in EHV AC electrical power are discussed in this comprehensive reference. Descriptions of energization, power quality, cable safety constraints and more, guide readers in cable planning and power network operations.

  8. Puget Sound area electric reliability plan. Draft environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  9. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  10. Planning Mechanisms for Regional Electric Power Supply System Development

    Directory of Open Access Journals (Sweden)

    Evgeniy Anatolyevich Malyshev

    2015-12-01

    Full Text Available Key problems of the regional electric power supply systems are examined. These problems result from a lack of regulated interaction mechanisms for uniting the different entities’ resources aimed at the realization of investment activities. One of the main problems of the power supply industry is physical and moral aging of both generating and networking equipment. In the article, the necessity of management system formation to control the development of power sector has been proved. The deficiencies of the modern investment procedure in power companies are described. The absence of continuity between the regional and local strategic planning documents and investment planning of a power company has been found out. The possibility to develop a new mechanism for attracting investment has been proposed. The regulation of joint activities to implement the development program for the regional power supply industry has been proposed. The management system to develop the Russian power industry has been proposed. The comparative analysis of generating capacity development mechanisms has been carried out, such as capacity supply agreement (CSA, investment support mechanism (ISM, and long-term power market (LPM. The interaction procedure of the planning of the power supply infrastructure development has been described. The mechanism connecting the state sectoral and regional planning and corporate planning of power supply infrastructure development has been proposed. The regional aspects of industrial policy and its legislative support have been considered. To successfully implement the public-private-partnership (PPP projects, it is necessary to create the effective PPP model within the federal and regional legislation framework; to develop the financial model providing the recoverability of investments; to provide a mutually beneficial cooperation between executive bodies and private investors. The possibility to apply the PPP mechanism for regional

  11. Sustaining the Northwest Way of Life.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration. Customer Services.

    1991-08-01

    These Discussion Papers are from a number of organizations with a high stake in the future performance of the Bonneville Power Administration. Bonneville solicited papers from other organizations to assure a broaded-based discussion of the topics for the 1991 Programs in Perspective. PIP meetings will be held throughout the Northwest in September. PIP runs on a two-year cycle. The first year is aimed at discussion of broad, strategic issues. The second year evaluates specific program levels for all Bonneville programs and test them for affordability against financial constraints. This year's PIP focuses on strategic-issues discussion. It specifically asks for regional discussion to help put some flesh on the skeleton of Bonneville's own vision for its future: Best for the Northwest Through Teamwork B... P... A... The Most Competitive and Socially Responsible Power System in the Nation'' Specific topics are (1) achieving social responsibility and (2) conserving Northwest competitiveness. Bonneville executives chose this vision as a means of directing the organization into and beyond the 1990s. It guides the 3000 plus employees of the agency in their day-to-day operations. By asking for discussion of the terms Most Competitive'' and Socially Responsible'' in the 1991 PIP, Bonneville intends to better understand the diverse needs of its customers and constituents, and to become of even greater service to the Northwest. The papers are designed to help stimulate thought about the dimensions of the future direction of BPA. Bonneville intends that the real substance of PIP will occur in the meetings themselves. We hope that these papers will provoke new thinking, and that the interchange of views in the meetings will produce new approaches to the issues.

  12. Offshore Wind Power Planning in Korea

    DEFF Research Database (Denmark)

    Seo, Chul Soo; Cha, Seung-Tae; Park, Sang Ho

    2012-01-01

    this possible, Korea has announced the National offshore power roadmap and is now in pursuit. However, large scale offshore wind farms can incur many problems, such as power quality problems, when connecting to a power system.[1][2] Thus, KEPCO is on the process of a research study to evaluate the effects...... that connecting offshore wind power generation to a power system has on the power system. This paper looks over offshore wind power planning in Korea and describes the development of impact assessment technology of offshore wind farms.......Wind power generation is globally recognized as the most universal and reliable form of renewable energy. Korea is currently depending mostly on coal and petroleum to generate electrical power and is now trying to replace them with renewable energy such as offshore wind power generation. To make...

  13. Characterizing Species at Risk II: Using Bayesian Belief Networks as Decision Support Tools to Determine Species Conservation Categories Under the Northwest Forest Plan

    Directory of Open Access Journals (Sweden)

    Bruce G. Marcot

    2006-12-01

    Full Text Available We developed a set of decision-aiding models as Bayesian belief networks (BBNs that represented a complex set of evaluation guidelines used to determine the appropriate conservation of hundreds of potentially rare species on federally-administered lands in the Pacific Northwest United States. The models were used in a structured assessment and paneling procedure as part of an adaptive management process that evaluated new scientific information under the Northwest Forest Plan. The models were not prescriptive but helped resource managers and specialists to evaluate complicated and at times conflicting conservation guidelines and to reduce bias and uncertainty in evaluating the scientific data. We concluded that applying the BBN modeling framework to complex and equivocal evaluation guidelines provided a set of clear, intuitive decision-aiding tools that greatly aided the species evaluation and conservation process.

  14. Carbon capture and storage in power generation and wind energy. Flexibility and reliability issues in scenarios for Northwest Europe

    International Nuclear Information System (INIS)

    Van Deurzen, J.; Seebregts, A.

    2011-01-01

    The Netherlands is both heavily dependent on the success of carbon capture and storage (CCS) and renewable electricity for its decarbonisation policy. The same holds for the EU and some of its Member States like the United Kingdom. This paper discusses several scenarios for the Netherlands within the context of a liberalized and a more and more connected energy market in Northwest-Europe. The research reported here shows that CCS on new coal fired power plants does not pose a threat to the increase in the electricity production by large quantities of wind energy in the electricity system, and vice versa. For renewable energy, several additional policies are in place mainly in the form of financial support as long as these renewable options are not yet profitable. For CCS, financial support is only granted now for a selection of the first demonstration projects now planned in the EU. It is not yet clear if large scale CCS and high shares of wind energy can be incorporated in a balanced way in the electricity system. This paper shows that from a technical and economic point of view, there is room for both, and under which conditions such a two fold growth will be feasible.

  15. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  16. Reactive power planning with FACTS devices using gravitational search algorithm

    Directory of Open Access Journals (Sweden)

    Biplab Bhattacharyya

    2015-09-01

    Full Text Available In this paper, Gravitational Search Algorithm (GSA is used as optimization method in reactive power planning using FACTS (Flexible AC transmission system devices. The planning problem is formulated as a single objective optimization problem where the real power loss and bus voltage deviations are minimized under different loading conditions. GSA based optimization algorithm and particle swarm optimization techniques (PSO are applied on IEEE 30 bus system. Results show that GSA can also be a very effective tool for reactive power planning.

  17. Power generation planning: a survey from monopoly to competition

    International Nuclear Information System (INIS)

    Kagiannas, A.G.; Askounis, D.T.; Psarras, J.

    2004-01-01

    During the last two decades electric power generation industry in many countries and regions around the world has undergone a significant transformation from being a centrally coordinated monopoly to a deregulated liberalized market. In the majority of those countries, competition has been introduced through the adoption of a competitive wholesale electricity spot market. Short-term efficiency of power generators under competitive environment has attracted considerable effort from researchers, while long-term investment performance has received less attention. In this context, the paper aims to serve as a comprehensive review basis for generation planning methods applied in a competitive electric power generation market. The traditional modeling techniques developed for generation expansion planning under monopoly are initially presented in an effort to assess the evolution of generation planning according to the evolution of the structure of the electric power market. (author)

  18. Integrated Wind Power Planning Tool

    DEFF Research Database (Denmark)

    Rosgaard, M. H.; Giebel, Gregor; Nielsen, T. S.

    2012-01-01

    model to be developed in collaboration with ENFOR A/S; a danish company that specialises in forecasting and optimisation for the energy sector. This integrated prediction model will allow for the description of the expected variability in wind power production in the coming hours to days, accounting......This poster presents the current state of the public service obligation (PSO) funded project PSO 10464, with the working title "Integrated Wind Power Planning Tool". The project commenced October 1, 2011, and the goal is to integrate a numerical weather prediction (NWP) model with purely...

  19. Small-scale hydroelectric power in the Pacific Northwest: new impetus for an old energy source

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    Energy supply is one of the most important issues facing Northwestern legislators today. To meet the challenge, state legislatures must address the development of alternative energy sources. The Small-Scale Hydroelectric Power Policy Project of the National Conference of State Legislators (NCSL) was designed to assist state legislators in looking at the benefits of one alternative, small-scale hydro. Because of the need for state legislative support in the development of small-scale hydroelectric, NCSL, as part of its contract with the Department of Energy, conducted the following conference on small-scale hydro in the Pacific Northwest. The conference was designed to identify state obstacles to development and to explore options for change available to policymakers. A summary of the conference proceedings is presented.

  20. Northwest Forest Plan—the first 10 years (1994–2003): socioeconomic monitoring results.

    Science.gov (United States)

    S. Charnley

    2006-01-01

    The socioeconomic monitoring report addresses two evaluation questions posed in the Northwest Forest Plan (the Plan) Record of Decision and assesses progress in meeting five Plan socioeconomic goals. Volume I of the report contains key findings. Volume II addresses the question, Are predictable levels of timber and nontimber resources available and being produced? It...

  1. Nuclear power planning study for Bangladesh

    International Nuclear Information System (INIS)

    1975-01-01

    The country's interest in and plans for nuclear power, as well as the organizational setup and involvement of the Bangladesh Atomic Energy Commission in the planning, construction and operation of nuclear power plants, are described. The report contains some data on population, general economics, gross national product, mineral resources and energy consumption. The electricity supply system, its development, generating and transmission facilities, costs of existing plants and plants under construction, various systems operation criteria, economic criteria and technical data on existing generating units are given. A number of appendixes have been included to provide additional and background information on the computer programs, methods of forecasting load, methodology and parameters used, fossil and nuclear fuel costs, general technical and economic data on thermal and nuclear plants, and other appropriate data

  2. Station planning and design incorporating modern power system practice

    CERN Document Server

    Martin, PC

    1991-01-01

    The planning and design of new power stations can involve complex interaction between the many engineering disciplines involved as well as environmental, planning, economical, political and social pressures. This volume aims to provide a logical review of the procedures involved in power station development. The engineering aspects are outlined in detail, with examples, showing the basis of the relationships involved together with ""non-engineering"" factors so that the engineer can draw on the information provided for specific projects. The civil engineering and building of power stations are

  3. Efficient energy utilization and environmental issues applied to power planning

    International Nuclear Information System (INIS)

    Campbell, Hector; Montero, Gisela; Perez, Carlos; Lambert, Alejandro

    2011-01-01

    This document shows the importance of policies for electric energy savings and efficient energy utilization in power planning. The contributions of economic, social, and environmental items were evaluated according to their financial effects in the delay of investments, reduction of production costs and decrement of environmental emissions. The case study is Baja California, Mexico; this system has a unique primary source: geothermal energy. Whether analyzing the planning as usual or planning from the supply side, the forecast for 2005-2025 indicates that 4500 MW additional installed capacity will be required (3-times current capacity), representing an investment that will emit 12.7 Mton per year of CO 2 to the atmosphere and will cost US$2.8 billion. Systemic planning that incorporates polices of energy savings and efficiency allows the reduction of investments and pollutant emissions. For example, a reduction of 20% in the growth trend of the electricity consumption in the industrial customers would save US$10.4 billion over the next 20 years, with a potential reduction of 1.6 Mton/year of CO 2 . The increase in geothermal power generation is also attractive, and it can be combined with the reduction of use and energy losses of utilities, which would save US$13.5 billion and prevent the discharge of 8.5 Mton/year of CO 2 . - Highlights: → We contrast power planning methods for supply electricity for economy development. → Importance of policies for electricity savings and efficient use in power planning. → Systemic planning facilitates decision-making process for electricity optimization. → Supply-side planning will cause climb in prices and loss of energy self-sufficiency. → Power planning should be immersed in an environment of appropriate energy policies.

  4. Energy and nuclear power planning studies

    International Nuclear Information System (INIS)

    Bennett, L.L.; Molina, P.E.; Mueller, T.

    1990-01-01

    The article focuses on the procedures established by the IAEA for providing assistance to international Member States in conducting studies for the analysis of the economic viability of a nuclear power programme. This article specifically reviews energy and nuclear power planning (ENPP) studies in Algeria, Jordan, and Thailand. It highlights major accomplishments in the context of study objectives and organizations, and the principal lessons learned in the process. 4 figs, 1 tab

  5. Integrated Wind Power Planning Tool

    DEFF Research Database (Denmark)

    Rosgaard, M. H.; Hahmann, Andrea N.; Nielsen, T. S.

    This poster describes the status as of April 2012 of the Public Service Obligation (PSO) funded project PSO 10464 \\Integrated Wind Power Planning Tool". The project goal is to integrate a meso scale numerical weather prediction (NWP) model with a statistical tool in order to better predict short...... term power variation from off shore wind farms, as well as to conduct forecast error assessment studies in preparation for later implementation of such a feature in an existing simulation model. The addition of a forecast error estimation feature will further increase the value of this tool, as it...

  6. Iskuulpa Watershed Management Plan : A Five-Year Plan for Protecting and Enhancing Fish and Wildlife Habitats in the Iskuulpa Watershed.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2003-01-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receive credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.

  7. Statistical modeling to support power system planning

    Science.gov (United States)

    Staid, Andrea

    This dissertation focuses on data-analytic approaches that improve our understanding of power system applications to promote better decision-making. It tackles issues of risk analysis, uncertainty management, resource estimation, and the impacts of climate change. Tools of data mining and statistical modeling are used to bring new insight to a variety of complex problems facing today's power system. The overarching goal of this research is to improve the understanding of the power system risk environment for improved operation, investment, and planning decisions. The first chapter introduces some challenges faced in planning for a sustainable power system. Chapter 2 analyzes the driving factors behind the disparity in wind energy investments among states with a goal of determining the impact that state-level policies have on incentivizing wind energy. Findings show that policy differences do not explain the disparities; physical and geographical factors are more important. Chapter 3 extends conventional wind forecasting to a risk-based focus of predicting maximum wind speeds, which are dangerous for offshore operations. Statistical models are presented that issue probabilistic predictions for the highest wind speed expected in a three-hour interval. These models achieve a high degree of accuracy and their use can improve safety and reliability in practice. Chapter 4 examines the challenges of wind power estimation for onshore wind farms. Several methods for wind power resource assessment are compared, and the weaknesses of the Jensen model are demonstrated. For two onshore farms, statistical models outperform other methods, even when very little information is known about the wind farm. Lastly, chapter 5 focuses on the power system more broadly in the context of the risks expected from tropical cyclones in a changing climate. Risks to U.S. power system infrastructure are simulated under different scenarios of tropical cyclone behavior that may result from climate

  8. Development of a decommissioning plan for nuclear power plant 'Krsko'

    International Nuclear Information System (INIS)

    Tankosic, Djurica; Fink, Kresimir

    1991-01-01

    Nuclear Power Plant 'Krsko' (NEK), is the only nuclear power plant in Yugoslavia, is a two-loop, Westinghouse-design, pressurized water reactor rated at 632 MWe. When NEK applied for an operating license in 1981, it did not have to explain how the plant would be decommissioned and decommissioning provisions were not part of the licensing process. Faced with mounting opposition to nuclear power and a real threat that the plant would be shut down, the plant management developed a Mission Plan for resolving the decommissioning problem. The Mission Plan calls for a preliminary decommissioning plan to be prepared and submitted to the local regulatory body before the end of 1992

  9. Planning and preparedness for radiological emergencies at nuclear power stations

    International Nuclear Information System (INIS)

    Thomson, R.; Muzzarelli, J.

    1996-01-01

    The Radiological Emergency Preparedness (REP) Program was created after the March 1979 accident at the Three Mile Island nuclear power station. The Federal Emergency Management Agency (FEMA) assists state and local governments in reviewing and evaluating state and local REP plans and preparedness for accidents at nuclear power plants, in partnership with the US Nuclear Regulatory Commission (NRC), which evaluates safety and emergency preparedness at the power stations themselves. Argonne National Laboratory provides support and technical assistance to FEMA in evaluating nuclear power plant emergency response exercises, radiological emergency plans, and preparedness

  10. Experimental Study on Productivity Performance of Household Combined Thermal Power and Biogas System in Northwest China

    Directory of Open Access Journals (Sweden)

    Jian Kang

    2018-01-01

    Full Text Available Ample quantities of solar and local biomass energy are available in the rural regions of northwest China to satisfy the energy needs of farmers. In this work, low-temperature solar thermal collectors, photovoltaic solar power generators, and solar-powered thermostatic biogas digesters were combined to create a heat, electricity, and biogas cogeneration system and were experimentally studied through two buildings in a farming village in northwestern China. The results indicated that the floor heater had the best heating effect. And the fraction of the energy produced by the solar elements of the system was 60.3%. The photovoltaic power-generation system achieved photovoltaic (PV conversion efficiencies of 8.3% and 8.1% during the first and second season, respectively. The intrinsic power consumption of the system was 143.4 kW·h, and 115.7 kW·h of electrical power was generated by the system in each season. The average volume of biogas produced daily was approximately 1.0 m3. Even though the ambient temperature reached −25°C, the temperature of the biogas digester was maintained at 27°C ± 2 for thermostatic fermentation. After optimization, the energy-saving rate improved from 66.2% to 85.5%. The installation reduced CO2 emissions by approximately 27.03 t, and the static payback period was 3.1 yr. Therefore, the system is highly economical, energy efficient, and beneficial for the environment.

  11. Experimental Study on Productivity Performance of Household Combined Thermal Power and Biogas System in Northwest China

    Science.gov (United States)

    Zhen, Xiaofei; Osman, Yassir Idris Abdalla; Feng, Rong; Si, Zetian

    2018-01-01

    Ample quantities of solar and local biomass energy are available in the rural regions of northwest China to satisfy the energy needs of farmers. In this work, low-temperature solar thermal collectors, photovoltaic solar power generators, and solar-powered thermostatic biogas digesters were combined to create a heat, electricity, and biogas cogeneration system and were experimentally studied through two buildings in a farming village in northwestern China. The results indicated that the floor heater had the best heating effect. And the fraction of the energy produced by the solar elements of the system was 60.3%. The photovoltaic power-generation system achieved photovoltaic (PV) conversion efficiencies of 8.3% and 8.1% during the first and second season, respectively. The intrinsic power consumption of the system was 143.4 kW·h, and 115.7 kW·h of electrical power was generated by the system in each season. The average volume of biogas produced daily was approximately 1.0 m3. Even though the ambient temperature reached −25°C, the temperature of the biogas digester was maintained at 27°C ± 2 for thermostatic fermentation. After optimization, the energy-saving rate improved from 66.2% to 85.5%. The installation reduced CO2 emissions by approximately 27.03 t, and the static payback period was 3.1 yr. Therefore, the system is highly economical, energy efficient, and beneficial for the environment. PMID:29862289

  12. Green power: A renewable energy resources marketing plan

    International Nuclear Information System (INIS)

    Barr, R.C.

    1997-01-01

    Green power is electricity generated from renewable energy sources such as power generated from the sun, the wind, the heat of the earth, and biomass. Green pricing is the marketing strategy to sell green power to customers who voluntarily pay a premium for it. Green pricing is evolving from the deregulation of the electric industry, the need for clean air, reflected in part as concern over global warming, and technology advances. The goal of the renewable energy marketing plan is to generate enough revenues for a utility to fund power purchase agreements (PPAs) with renewable energy developers or construct its own renewable facilities. Long-term, fixed price PPAs enable developers to obtain financing to construct new facilities, sometimes taking technological risks which a utility might not take otherwise. The marketing plan is built around different rate premiums for different categories of ratepayers, volunteer customer participation, customer participation recognition, and budget allocations between project costs and power marketing costs. Green prices are higher than those for conventional sources, particularly prices from natural gas fired plants. Natural gas is abundant relative to oil in price per British thermal unit (Btu). Green pricing can help bridge the gap between the current oversupply of gas and the time, not far off, when all petroleum prices will exceed those for renewable energy. The rapid implementation of green pricing is important. New marketing programs will bolster the growing demand for renewable energy evidenced in many national surveys thus decreasing the consumption of power now generated by burning hydrocarbons. This paper sets forth a framework to implement a green power marketing plan for renewable energy developers and utilities working together

  13. Energy and nuclear power planning study for Algeria

    International Nuclear Information System (INIS)

    1985-01-01

    This study, conducted jointly by a team of engineers and economists from the Sonelgaz company and the IAEA, had three objectives: (1) To perform a preliminary economic study aimed at initiating thinking on the role that nuclear power could play in Algeria's long-term energy structure and to suggest reasonable hypotheses on what share of the energy market nuclear power might supply. (2) To train a team of Algerian engineers and economists in long-term economic planning techniques. Once the team has gained a basic knowledge through this preliminary study, it will be in a position to continue the process, to perform other, more detailed independent analyses and to review the entire process should economic conditions change. (3) To introduce in Algeria the computer techniques and facilities needed to carry out such energy investment planning studies for electricity production. The main aim throughout the studies was to train a team of Algerian engineers in energy planning rather than to come to definitive conclusions on the problem of introducing nuclear power in Algeria. Two successive analyses were performed. The first consisted in evaluating the final energy requirements which will result in the medium and long term (by 2015) from the implementation of the economic development policies in the Five Year Plan (up to 1984) and in the proposals for the next decade (up to 1990) being studied by the Algerian Ministry of Planning. The second part is concerned only with the results regarding future electricity requirements, which are used as input data in studying the optimization of Algeria's future electricity generating system. Various methods of generation are analysed and included in an econometric model in order to make a sequential determination of the most economic composition of power generating capacity

  14. Mechanisms of power in participatory rural planning

    DEFF Research Database (Denmark)

    Johansen, Pia Heike; Chandler, Thomas Lund

    2015-01-01

    that in such an assessment of power it is needed also to drawn in the social context because different social contexts will be more or less vulnerable to different mechanisms of power. The paper takes the stand the rural settings are especially vulnerable to dis-engagement of local citizens, sub-ordination of the rural...... by the urban privilege to define the rural qualities and creation of local conflicts and that mechanisms of power that cause such unintended outcomes of rural planning projects should be uncovered. Inspired by Foucault's interpretation of power the paper carries out a grounded theory inspired analysis...

  15. Yakima fisheries project spring chinook supplementation monitoring plan

    International Nuclear Information System (INIS)

    Busack, C.; Pearsons, T.; Knudsen, C.; Phelps, S.; Watson, B.; Johnston, M.

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document

  16. Power system restoration: planning and simulation

    Energy Technology Data Exchange (ETDEWEB)

    Hazarika, D. [Assam Engineering Coll., Dept. of Electrical Engineering, Assam (India); Sinha, A.K. [Inidan Inst. of Technology, Dept. of Electrical Engineering, Kharagpur (India)

    2003-03-01

    This paper describes a restoration guidance simulator, which allows power system operator/planner to simulate and plan restoration events in an interactive mode. The simulator provides a list of restoration events according to the priority based on some restoration rules and list of priority loads. It also provides in an interactive mode the list of events, which becomes possible as the system grows during restoration. Further, the selected event is validated through a load flow and other analytical tools to show the consequences of implementing the planned event. (Author)

  17. Workforce Planning for New Nuclear Power Programmes

    International Nuclear Information System (INIS)

    2011-01-01

    An appropriate infrastructure is essential for the efficient, safe, reliable and sustainable use of nuclear power. The IAEA continues to be encouraged by its Member States to provide assistance to those considering the introduction of nuclear power. Its response has been to increase technical assistance, organize more missions and hold workshops, as well as to issue new and updated publications in the IAEA Nuclear Energy Series. Milestones in the Development of a National Infrastructure for Nuclear Power, an IAEA Nuclear Energy Series publication (NG-G-3.1), provides detailed guidance on a holistic approach to national nuclear infrastructure development involving three phases. Nineteen issues are identified in this guide, ranging from development of a government's national position on nuclear power to planning for procurement related to the first nuclear power plant. One of these 19 issues upon which each of the other 18 depend is suitable human resources development. As a growing number of Member States begin to consider the nuclear power option, they ask for guidance from the IAEA on how to develop the human resources necessary to launch a nuclear power programme. The nuclear power field, comprising industry, government authorities, regulators, R and D organizations and educational institutions, relies on a specialized, highly trained and motivated workforce for its sustainability and continued success, quite possibly more than any other industrial field. This report has been prepared to provide information on the use of integrated workforce planning as a tool to effectively develop these resources for the spectrum of organizations that have a stake in such nuclear power programmes. These include, during the initial stages, a nuclear energy programme implementing organization (NEPIO), as well as the future operating organization, nuclear regulatory body, government authorities and technical support organizations if a decision is made to initiate a nuclear power

  18. Electric Utility Generating Units: Repealing the Clean Power Plan

    Science.gov (United States)

    The Clean Power Plan established emission guidelines for states to follow in limiting carbon dioxide (CO2) emissions from existing power plants. EPA is proposing to repeal the CPP and rescind the accompanying legal memorandum.

  19. Nez Perce tribal hatchery project : combined-planning and design and operations and maintenance reports, annual report, 2000

    International Nuclear Information System (INIS)

    Larson, Roy Edward; Walker, Grant

    2002-01-01

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O and M) and Planning and Design (P and D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002

  20. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  1. Relation between source term and emergency planning for nuclear power plants

    International Nuclear Information System (INIS)

    Shi Zhongqi; Yang Ling

    1992-01-01

    Some background information of the severe accidents and source terms related to the nuclear power plant emergency planning are presented. The new source term information in NUREG-0956 and NUREG-1150, and possible changes in emergency planning requirements in U.S.A. are briefly provided. It is suggested that a principle is used in selecting source terms for establishing the emergency planning policy and a method is used in determining the Emergency Planning Zone (EPZ) size in China. Based on the research results of (1) EPZ size of PWR nuclear power plants being built in China, and (2) impact of reactor size and selected source terms on the EPZ size, it is concluded that the suggested principle and the method are suitable and feasible for PWR nuclear power plants in China

  2. Marketing energy conservation options to Northwest manufactured home buyers. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, P.L.; Mohler, B.L.; Taylor, Z.T.; Lee, A.D.; Onisko, S.A.

    1985-10-01

    Manufactured, or HUD-Code, homes comprise a growing share of the housing stock in the Northwest, as well as nationally. Their relatively low cost has made them especially attractive to lower income families, first-time home-buyers, and retired persons. The characteristics of manufactured home (MH) buyers, the unique energy consumption characteristics of the homes, and their increasing market share make this market an especially critical one for energy consumption and conservation planning in the Northwest. This study relies on extensive, existing survey data and new analyses to develop information that can potentially assist the design of a marketing plan to achieve energy conservation in new manufactured homes. This study has the objective of assisting BPA in the development of a regional approach in which numerous organizations and parties would participate to achieve conservation in new manufactured homes. A previous survey and information collected for this study from regional dealers and manufacturers provide an indication of the energy conservation options being sold to manufactured home buyers in the PNW. Manufacturers in the Northwest appear to sell homes that usually exceed the HUD thermal requirements. Manufacturers typically offer efficiency improvements in packages that include fixed improvements in insulation levels, glazing, and infiltration control. Wholesale costs of these packages range from about $100 to $1500. Typical packages include significant upgrades in floor insulation values with modest upgrades in ceilings and walls. This study identifies trends and impacts that a marketing plan should consider to adequately address the financial concerns of manufactured home buyers.

  3. Recycling of beverage containers in the Northwest Territories

    Energy Technology Data Exchange (ETDEWEB)

    1987-02-01

    This study researched existing recycling systems, presented pertinent data on the beverage and transportation industries, and evaluated the potential of recycling beverage bottles and cans in the Northwest Territories. The study first describes the history and existing concepts of recycling, provides a general description of recycling methods with advantages and disadvantages, and highlights particular approaches taken by other provinces. Markets for the Northwest Territories are also discussed, including the potential of recoverable material, anticipated recovery rates, transportation to markets, and present recycling operations. Three strategies are identified for the southwest, northwest, and the eastern Region. Recycling is preferred for aluminium cans, glass beer bottles, plastic bottles, and glass wine and liquor bottles in that order. The report recommends a limited program for aluminium cans and beer bottles to begin immediately. Beer bottles should be refilled either in Alberta or the Northwestern Territories and aluminium cans should be compacted and shipped to recycling markets in southern Canada or the United States. The program should first be implemented in areas serviced by Alberta and accessible by truck or barge from Hay River. A program implementation plan is also included. 8 refs., 2 figs., 14 tabs.

  4. Study of the proper contribution of independent power producing business in the long-range power supply and demand plan

    Energy Technology Data Exchange (ETDEWEB)

    Jo, S.B. [Korea Energy Economics Institute, Euiwang (Korea, Republic of)

    1997-12-01

    The independent power producing business has expanded its size and process through the Long-range Power Supply and Demand Plan of 1993, 1995, and it is high time that full-scale competition in the power generation market began to emerge. This report assesses the marginal costs of independent and general power producing businesses on a theoretical basis on the proper size of independent power producing business, and presents the methods to compare these. But, since there follows several problems in applying this theoretical model, a practical standard to decide the proper level of independent power production amount is presented. That is, while not much burdening the existing industrial structure, I search for ways to present the amount of independent power production and the methods of power generation to make sure that the competition effect is maximized when full-scale competition started. However, in the long-term, the allotment of independent power production itself could be a violation to the basic spirit of competition. A more desirable way is to allow independent power producers and the Korea Power Corp. to freely compete on all types of power generation and facilities. The supply plan should be also operated smoothly and flexibly since the types of power generation and the amounts reflect the result of competition not the predetermined ones. Therefore, a long-range power supply and demand plan should be converted from a planning-oriented concept to a market-oriented base with the structural overhaul of the power generation industry for the effective resources distribution of power supply facilities. 18 refs., 2 figs., 7 tabs.

  5. Environmental costs and benefits case study: nuclear power plant. Quantification and economic valuation of selected environmental impacts/effects. Final report

    International Nuclear Information System (INIS)

    1984-02-01

    This case study is an application, to a nuclear power plant, of the methodology for quantifying environmental costs and benefits, contained in the regional energy plan, adopted in April, 1983, by the Northwest Power Planning Council, pursuant to Public Law 96-501.The study is based on plant number 2 of the Washington Public Power Supply System (WNP-2), currently nearing completion on the Hanford Nuclear Reservation in eastern Washington State. This report describes and documents efforts to quantify and estimate monetary values for the following seven areas of environmental effects: radiation/health effects, socioeconomic/infrastructure effects, consumptive use of water, psychological/health effects (fear/stress), waste management, nuclear power plant accidents, and decommissioning costs. 103 references

  6. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  7. A mid-term, market-based power systems planning model

    International Nuclear Information System (INIS)

    Koltsaklis, Nikolaos E.; Dagoumas, Athanasios S.; Georgiadis, Michael C.; Papaioannou, George; Dikaiakos, Christos

    2016-01-01

    Highlights: • A mid-term Energy Planning along with a Unit Commitment model is developed. • The model identifies the optimum interconnection capacity. • Electricity interconnections affect the power mix and the day-ahead spot price. • Renewables’ penetration has impacts on the power reserves and the CO_2 emissions. • Energy policy and fuel pricing can have significant impacts on the power mix. - Abstract: This paper presents a generic Mixed Integer Linear Programming (MILP) model that integrates a Mid-term Energy Planning (MEP) model, which implements generation and transmission system planning at a yearly level, with a Unit Commitment (UC) model, which performs the simulation of the Day-Ahead Electricity Market. The applicability of the proposed model is illustrated in a case study of the Greek interconnected power system. The aim is to evaluate a critical project in the Ten Year Network Development Plan (TYNDP) of the Independent Power Transmission System Operator S.A. (ADMIE), namely the electric interconnection of the Crete Island with the mainland electric system. The proposed modeling framework identifies the implementation (or not) of the interconnection of the Crete Island with the mainland electric system, as well as the optimum interconnection capacity. It also quantifies the effects on the Day-Ahead electricity market and on the energy mix. The paper demonstrates that the model can provide useful insights into the strategic and challenging decisions to be determined by investors and/or policy makers at a national and/or regional level, by providing the optimal energy roadmap and management, as well as clear price signals on critical energy projects under real operating and design constraints.

  8. Implications of sustainability assessment for electricity system design: The case of the Ontario Power Authority's integrated power system plan

    International Nuclear Information System (INIS)

    Winfield, Mark; Gibson, Robert B.; Markvart, Tanya; Gaudreau, Kyrke; Taylor, Jennifer

    2010-01-01

    This paper explores the results and implications of an illustrative application of a sustainability assessment framework in the design and evaluation of a major integrated power system plan. The paper examines the integrated power system plan developed by the Ontario Power Authority in 2007. The basic framework rests on a generic set of evaluation criteria reflecting basic requirements for progress towards sustainability that was adopted, reinterpreted and applied by the Authority in support of its proposed plan. In response to evident deficiencies in the Authority's work, the authors and colleagues undertook a re-examination using a more fully elaborated sustainability assessment framework, specified for application to power system planning. The results point to a plan and plan components substantially different from those proposed by the Authority. More generally, the results highlight three advantages of applying such a sustainability assessment framework: comprehensive coverage of key requirements for progress towards sustainability while ensuring careful attention to the context and concerns of the sector; emphasis on identifying plan options that avoid major trade-offs among the sustainability criteria and recognition of interactions among the social, ecological, economic and technological realms favouring options that offer multiple, mutually reinforcing and lasting benefits.

  9. Wind power planning in France (Aveyron), from State regulation to local planning

    Energy Technology Data Exchange (ETDEWEB)

    Nadai, Alain [CIRED - Centre Int. de Recherche sur l' Environnement et le Developpement (France); Labussiere, Olivier [Univ. de Pau et des Pays de l' Adour, Laboratoire Societe Environnement Territoire (France)

    2007-07-01

    Since a few years, French wind power has undertaken an unprecedented development. Few turbines are in place (756 MW), but the overall granted capacity amounts to about 2.7 GW. The administrative territory of Aveyron, one of the best wind power potential in the Country, is an interesting case for understanding the ways in which industrial wind power is being developed and regulated in France. The paper presents Aveyron wind power development by dividing it into three periods. For each period, we also sketch national developments in wind power policy.Between 1996 and 2000, Aveyron was one of the few places selected for developing wind parks under the French 'Eole 2005' call for tender. Between 2000 and 2005, French regulation shifted to fixed tariffs for small wind parks (less than 12 MW). The lack of planning approach provided developers with a window for profits. Numerous projects of small parks were submitted for development authorisation, overflowing the local administration. During the year of 2003, a new law on urbanism provided some rules for individual project developments without answering the key issue of territorial planning. In Aveyron, a local scheme devised by the decentralized branches of the State had a limited reach due to the lack of mandatory status and concentration.In July 2005, a new Energy Law imposed the design of Wind Power Development Zones (WPDZ) as a condition for tariff benefit (starting July 2007). WPDZ appeared to local actors as a promising tool but it came late. Many projects were already granted with construction permits.

  10. Climate change and health effects in Northwest Alaska

    Directory of Open Access Journals (Sweden)

    Michael Brubaker

    2011-10-01

    Full Text Available This article provides examples of adverse health effects, including weather-related injury, food insecurity, mental health issues, and water infrastructure damage, and the responses to these effects that are currently being applied in two Northwest Alaska communities.In Northwest Alaska, warming is resulting in a broad range of unusual weather and environmental conditions, including delayed freeze-up, earlier breakup, storm surge, coastal erosion, and thawing permafrost. These are just some of the climate impacts that are driving concerns about weather-related injury, the spread of disease, mental health issues, infrastructure damage, and food and water security. Local leaders are challenged to identify appropriate adaptation strategies to address climate impacts and related health effects.The tribal health system is combining local observations, traditional knowledge, and western science to perform community-specific climate change health impact assessments. Local leaders are applying this information to develop adaptation responses.The Alaska Native Tribal Health Consortium will describe relationships between climate impacts and health effects and provide examples of community-scaled adaptation actions currently being applied in Northwest Alaska.Climate change is increasing vulnerability to injury, disease, mental stress, food insecurity, and water insecurity. Northwest communities are applying adaptation approaches that are both specific and appropriate.The health impact assessment process is effective in raising awareness, encouraging discussion, engaging partners, and implementing adaptation planning. With community-specific information, local leaders are applying health protective adaptation measures.

  11. Methods and Algorithms for Economic MPC in Power Production Planning

    DEFF Research Database (Denmark)

    Sokoler, Leo Emil

    in real-time. A generator can represent a producer of electricity, a consumer of electricity, or possibly both. Examples of generators are heat pumps, electric vehicles, wind turbines, virtual power plants, solar cells, and conventional fuel-fired thermal power plants. Although this thesis is mainly...... concerned with EMPC for minutes-ahead production planning, we show that the proposed EMPC scheme can be extended to days-ahead planning (including unit commitment) as well. The power generation from renewable energy sources such as wind and solar power is inherently uncertain and variable. A portfolio...... design an algorithm based on the alternating direction method of multipliers (ADMM) to solve input-constrained OCPs with convex objective functions. The OCPs that occur in EMPC of dynamically decoupled subsystems, e.g. power generators, have a block-angular structure. Subsystem decomposition algorithms...

  12. Power Subscription Strategy

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1998-12-21

    This document lays out the Bonneville Power Administration`s Power Subscription Strategy, a process that will enable the people of the Pacific Northwest to share the benefits of the Federal Columbia river Power System after 2001 while retaining those benefits within the region for future generations. The strategy also addresses how those who receive the benefits of the region`s low-cost federal power should share a corresponding measure of the risks. This strategy seeks to implement the subscription concept created by the Comprehensive Review in 1996 through contracts for the sale of power and the distribution of federal power benefits in the deregulated wholesale electricity market. The success of the subscription process is fundamental to BPA`s overall business purpose to provide public benefits to the Northwest through commercially successful businesses.

  13. Plan4all – A European Approach to Spatial Data Used on Territorial Planning

    Directory of Open Access Journals (Sweden)

    GERGELY TÖRÖK

    2011-01-01

    Full Text Available In order to ensure the increased efficiency of European policies and the implementation of Structural Funds in a more balanced manner in the different territories of the country, a number of eight development regions have been established in Romania, corresponding to NUTS II level. In between these regions, as well as within each of them, a major concern is the diminution of economic and social disparities. Moreover, these disparities can manifest themselves in a cross-border context, jumping the administrative boundaries of regions and even neighbouring countries. In this sense, development plans provide certain measures in order to stimulate a more balanced development of the territories, using spatial planning as the actual support in identifying factors that lead to the emergence and intensifying of regional disparities. The present paper focuses on these aspects related to spatial planning data in the context of the recent European initiatives, through the activities of the Plan4all project that is being implemented by a European consortium. Romania is partner in this project and is represented by the North-West Regional Development Agency (North-West RDA. The paper presents the achievements of the running Plan4all project until the present day, as well as the involvement and the contributions of the North-West RDA so far.

  14. Daya Bay Nuclear Power Station five-year business plan and operating results

    International Nuclear Information System (INIS)

    Zhang Shanming

    2000-01-01

    Guangdong Nuclear Power Joint Venture Company, Ltd. first 5-Year Business Plan (hereinafter referred to as 5-Year Business Plan) serves as guidance of both the operations and management of the company. Continuous performance improvement of the nuclear power station has been achieved through the fulfillment of goals and improvement plan defined by the 5-Year Business Plan, and through standard and systematic management. Daya Bay Nuclear Power Station (GNPS) has made great contributions to sustainable economic developments of both Guangdong and Hong Kong since its commercial operation in 1994. As of the end of 1999, the cumulative off-take electricity generated by GNPS had reached 69.9 billion kWh. Of the WANO indicators universally applied by nuclear power industry throughout the world, 6 indicators of Daya Bay performance entered the world top quartile while 9 the medium level

  15. 76 FR 75771 - Emergency Planning Guidance for Nuclear Power Plants

    Science.gov (United States)

    2011-12-05

    ... Guidance for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of NUREG... Support of Nuclear Power Plants;'' NSIR/DPR-ISG-01, ``Interim Staff Guidance Emergency Planning for Nuclear Power Plants;'' and NUREG/CR-7002, ``Criteria for Development of Evacuation Time Estimate Studies...

  16. New Brunswick Power Corporation: Business plan, 1994-1999

    International Nuclear Information System (INIS)

    1994-02-01

    The first publicly available business plan for the New Brunswick Power Corp. is presented. The five-year plan provides an overview of the Corporation's performance and directions, including possible future rate increases. A review of the corporate history of the utility is followed by a description of the strategic framework under which the Corporation conducts its business operations. The information presented includes customer requirements, power generation and transmission, system operations, personnel management, environmental protection, and external factors affecting operations. This overview demonstrates the complex issues facing the utility, the choices made in the past, and the matters that will have to be faced in the future. The business overview is followed by focused business plans in six key functional areas (facilities, operations, personnel, technology, environment, and finances) and comprehensive financial forecasts that outline a commitment to maintain competitive rates for customers. The reasoning behind the forecasts is explained and a glossary is included. 21 figs., 16 tabs

  17. Missions and planning for nuclear space power

    International Nuclear Information System (INIS)

    Buden, D.

    1979-01-01

    Requirements for electrical and propulsion power for space are expected to increase dramatically in the 1980s. Nuclear power is probably the only source for some deep space missions and a major competitor for many orbital missions, especially those at geosynchronous orbit. Because of the potential requirements, a technology program on reactor components has been initiated by the Department of Energy. The missions that are foreseen, the current reactor concept, and the technology program plan are described

  18. Nuclear power in Asia: Experience and plans

    International Nuclear Information System (INIS)

    Lee Chang Kun

    1999-01-01

    Asian countries have developed ambitious energy supply programs to expand their energy supply systems to meet the growing needs of their rapidly expanding economies. Most of their new electrical generation needs will be met by coal, oil and gas. However, the consideration of growing energy demand, energy security, environmental conservation, and technology enhancement is inducing more Asian countries toward the pursuit of nuclear power development. At present, nuclear power provides about 30% of electricity in Japan, and about 40% of electricity in Korea. These and other Asian countries are presumed to significantly increase their nuclear power generation capacities in coming years. Korea's nuclear power generation facilities are projected to grow from 12 gigawatt in 1998 to 16.7 gigawatt by 2004. On the other hand, China and India have now installed nuclear capacities of about 2 gigawatt, respectively, which will increase by a factor of two or more by 2004. The installed nuclear capacity in the Asian region totalled 67 gigawatt as of the end of 1997, representing about sixteen percent of the world capacity of 369 gigawatt. Looking to the year 2010, it is anticipated that most of the world's increase in nuclear capacity will come from Asia. It is further forecasted that Asian nations will continue to expand their nuclear capacity as they move into the 21st century. For example, China plans to develop additional 18 gigawatt of nuclear power plants by the year 2010. Nuclear power is also of particular interest to a number of emerging Asian countries in view of environmental conservation and mitigation of greenhouse gas emissions in particular. Nuclear power appeals to some countries because of its high technology content. The strength in an advanced technology, such as the technological capability related to nuclear power, contributes to the overall development of the corresponding country's engineering base, enhancement of industrial infrastructure and expansion of

  19. Guidance for emergency planning in nuclear power plants

    International Nuclear Information System (INIS)

    Magnusson, Tommy; Ekdahl, Maria

    2008-06-01

    Ringhals has been a model for this study, but the purpose has been to make the report applicable at all nuclear power plants in Sweden. The work has been done in close co-operation with the Swedish nuclear power plants and Rescue Services in the nuclear power municipalities Oesthammar, Oskarshamn, and Varberg. The internal fire brigade at the nuclear power plants has also been involved. A document will also be published as a further guidance at efforts of the type fires, which are mentioned in the enclosed document. After a fire in a switchgear room in 2005 the need of making the existing effort planning more effective at nuclear power plants was observed. The idea with the planning is to plan the effort in order to give the operational and emergency staff a good and actual support to come to a decision and to start the mission without delay. The risk information is showed by planning layouts, symbols and drawings as basis, give risk information and effort information. The effort information shows outer arrangements, manual action points, fire installations, passive fire safety etc. The risk information is shown by risk symbols. Their purpose is to give a fast overview of the existing risks. Reactor safety effects is the ruling influence if an effort has to be done in order to secure safety for a third person. In order to make an effort in an area personal risks for rescue staff, such as electricity risks, radiological risks, chemicals and gas bottles with compressed gases, has to be eliminated. For complicated missions detailed instructions are needed in order to handle specific risks. In a group discussion different people with pertinent knowledge has to value which problematic efforts need detailed instruction. Missions that have to be analyzed in a work group as above are: fire may affect the reactor safety, fire that may threaten the structural integrity, chemical discharge with big consequence on environment/third person and handling of gas system (compressed

  20. Windscale - power versus pollution

    International Nuclear Information System (INIS)

    Bonney, S.

    1977-01-01

    Protests from British environmental groups, scientists, politicians and private citizens has forced the Government to postpone a decision on plans to create the world's largest nuclear fuel oxide reprocessing complex at Windscale, on the north-west coast of England. Subjects considered here are the vast increase in the the quantity of lethal nuclear waste stored at Windscale, the risk of explosion or plant malfunction causing radioactive fall-out, the increased radioactive discharge into the Irish Sea and into the atmosphere and the danger of terrorism or sabotage. It is stated that critics of the Windscale project have yet to be convinced that the nuclear power industry is as risk-free as its proponents maintain in public statements. To satisfy the great anxieties shared by a large number of people about the expansion plan, a full public inquiry is essential. (U.K.)

  1. Results from the Macedonian power system development planning

    International Nuclear Information System (INIS)

    Volkanovski, A.; Bosevski, T.; Todorovski, M.

    2000-01-01

    In this paper we present the results from the development planning of the Macedonian power system for the period 2001-2020. Taking into account the fact that one can not consider construction of new power generating units on domestic lignite due to its shortage, development of the national power system can be supported by utilisation of hydro potential, natural gas within the capabilities of the existing gas pipeline and nuclear energy. The crucial year in the planning period will be the year when reduction of the lignite utilisation in the existing thermal plants will take place, which will cause construction of new units with significant capacities. We have analysed two possibilities for inclusion od nuclear plant, optimal based on the economical criteria and forced with delay of the on-line year of the nuclear plant starting from the optimal year for its construction (2014 which was obtained from the WASP optimisation procedure) and ending with the year 2021 (one year beyond the study period). (author)

  2. Level of male involvement and associated factors in family planning services utilization among married men in Debremarkos town, Northwest Ethiopia.

    Science.gov (United States)

    Kassa, Mihretie; Abajobir, Amanuel Alemu; Gedefaw, Molla

    2014-12-02

    Men's participation is crucial to the success of family planning programs and women's empowerment and associated with better outcomes in reproductive health such as contraceptive acceptance and continuation, and safer sexual behaviors. Limited choice and access to methods, attitudes of men towards family planning, perceived fear of side-effects, poor quality of available services, cultural or religious oppositions and gender-based barriers are some of the reasons for low utilization of family planning. Hence, this study assessed the level of male involvement in family planning services utilization and its associated factors in Debremarkos town, Northwest Ethiopia. A community-based cross-sectional study was conducted from October to November, 2013. Multi-stage sampling technique was used to select 524 eligible samples. Data were collected by using semi-structured questionnaires. Epi Info and SPSS were used to enter and analyze the data; univariate, bivariate and logistic regression analyses were performed to display the outputs. Only 44 (8.4%) respondents were using or directly participating in the use of family planning services mainly male condoms. The reasons mentioned for the low participation were the desire to have more children, wife or partner refusal, fear of side effects, religious prohibition, lack of awareness about contraceptives and the thinking that it is the only issue for women. Opinion about family planning services, men approval and current use of family planning methods were associated with male involvement in the services utilization. In this study, the level of male involvement was low. Lack of information, inaccessibility to the services and the desire to have more children were found to be the reasons for low male involvement in family planning services utilization. Governmental and nongovernmental organizations, donors and relevant stakeholders should ensure availability, accessibility and sustained advocacy for use of family planning

  3. Air quality analysis for the Western Area Power Administration's 2004 Power Marketing Plan Environmental Impact Statement

    International Nuclear Information System (INIS)

    Glantz, C.S.; Dagle, J.E.; Bilyard, G.R.

    1997-01-01

    The Western Area Power Administration (Western) markets and transmits electric power throughout 15 western states. Western's Sierra Nevada Customer Service Region (Sierra Nevada Region) markets approximately 1,480 megawatts (MW) of firm power (plus 100 MW of seasonal peaking capacity) from the Central Valley Project (CVP) and other resources. Western's mission is to sell and deliver electricity generated from these resources. Western's capacity and energy sales must be in conformance with the laws that govern its sale of electrical power. Further, Western's hydropower operations at each facility must comply with minimum and maximum flows and other constraints set by other regulatory agencies. The Sierra Nevada Region proposes to develop a marketing plan that defines the products and services it would offer beyond the year 2004 and the eligibility and allocation criteria for its electric power resources. Because determining levels of long-term firm power resources to be marketed and subsequently entering into contracts for the delivery of related products and services could be a major Federal action with potentially significant impacts to the human environment, the 2004 Power Marketing Plan Environmental Impact Statement (2004 EIS) is being prepared. Decisions made by the Sierra Nevada Region on how and when to supply power to its customers would influence the operation of power plants within the Western Systems Coordinating Council (WSCC). If the resources affected are thermal resources, this could in turn affect the amount, timing, and location of pollutant emissions to the air at locations throughout the western United States. This report has been produced in conjunction with the 2004 EIS to provide a more detailed discussion of the air quality implications of the 2004 power marketing plan

  4. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  5. Life-history traits of the northwest European flora : The LEDA database

    NARCIS (Netherlands)

    Knevel, IC; Bekker, RM; Bakker, JP; Kleyer, M

    An international group of scientists is building a 'trait base', an open internet database of life-history traits of the Northwest European flora (LEDA) that can be used as a tool in planning, in nature conservation and restoration, and in other applied research. The species-trait matrix will

  6. Short-Term Planning of Hybrid Power System

    Science.gov (United States)

    Knežević, Goran; Baus, Zoran; Nikolovski, Srete

    2016-07-01

    In this paper short-term planning algorithm for hybrid power system consist of different types of cascade hydropower plants (run-of-the river, pumped storage, conventional), thermal power plants (coal-fired power plants, combined cycle gas-fired power plants) and wind farms is presented. The optimization process provides a joint bid of the hybrid system, and thus making the operation schedule of hydro and thermal power plants, the operation condition of pumped-storage hydropower plants with the aim of maximizing profits on day ahead market, according to expected hourly electricity prices, the expected local water inflow in certain hydropower plants, and the expected production of electrical energy from the wind farm, taking into account previously contracted bilateral agreement for electricity generation. Optimization process is formulated as hourly-discretized mixed integer linear optimization problem. Optimization model is applied on the case study in order to show general features of the developed model.

  7. Pacific Northwest National Laboratory institutional plan FY 1998--2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    Pacific Northwest National Laboratory`s core mission is to deliver environmental science and technology in the service of the nation and humanity. Through basic research the lab creates fundamental knowledge of natural, engineered, and social systems that is the basis for both effective environmental technology and sound public policy. They solve legacy environmental problems by delivering technologies that remedy existing environmental hazards, they address today`s environmental needs with technologies that prevent pollution and minimize waste, and they are laying the technical foundation for tomorrow`s inherently clean energy and industrial processes. The lab also applies their capabilities to meet selected national security, energy, and human health needs; strengthen the US economy; and support the education of future scientists and engineers. The paper summarizes individual research activities under each of these areas.

  8. Economic market design and planning for electric power systems

    CERN Document Server

    Mili, Lamine

    2010-01-01

    Discover cutting-edge developments in electric power systems. Stemming from cutting-edge research and education activities in the field of electric power systems, this book brings together the knowledge of a panel of experts in economics, the social sciences, and electric power systems. In ten concise and comprehensible chapters, the book provides unprecedented coverage of the operation, control, planning, and design of electric power systems. It also discusses:. A framework for interdisciplinary research and education;. Modeling electricity markets;. Alternative economic criteria and proactiv.

  9. Large-scale utilization of wind power in China: Obstacles of conflict between market and planning

    International Nuclear Information System (INIS)

    Zhao Xiaoli; Wang Feng; Wang Mei

    2012-01-01

    The traditional strict planning system that regulates China's power market dominates power industry operations. However, a series of market-oriented reforms since 1997 call for more decentralized decision-making by individual market participants. Moreover, with the rapid growth of wind power in China, the strict planning system has become one of the significant factors that has curtailed the generation of wind power, which contradicts with the original purpose of using the government's strong control abilities to promote wind power development. In this paper, we first present the reasons why market mechanisms are important for large-scale utilization of wind power by using a case analysis of the Northeast Grid, and then we illustrate the impact of conflicts between strict planning and market mechanisms on large-scale wind power utilization. Last, we explore how to promote coordination between markets and planning to realize large-scale wind power utilization in China. We argue that important measures include implementing flexible power pricing mechanisms instead of the current fixed pricing approach, formulating a more reasonable mechanism for distributing benefits and costs, and designing an appropriate market structure for large-scale wind power utilization to promote market liquidity and to send clear market equilibrium signals. - Highlights: ► We present the reasons why market is important for utilization of wind power. ► We discuss the current situation of the conflict between planning and market. ► We study the impact of conflict between planning and market on wind power output. ► We argue how to promote coordination between market and planning.

  10. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  11. Proceedings of the Canadian Institute's BC power conference : maximizing opportunities in the evolving electricity sector

    International Nuclear Information System (INIS)

    2004-01-01

    This conference provided a forum for reviewing recent events and activities in British Columbia's electric power industry. Issues regarding energy supply, reliability, power generation, power distribution and power transmission were discussed along with the opportunities and challenges of developing renewable energy sources. Participants at the conference gained insight into strategies for determining the usefulness of an energy plan; assessing the prospects for new generation capacity; examining future whole sale markets; analyzing congestion problems; identifying import and export opportunities; planning for rate design and exploring the future supply on Vancouver Island. The possibilities for meeting the growing demand for electricity through an integrated electrical transmission system throughout the west coast, British Columbia, the Pacific Northwest and Alberta were examined along with financing structures and strategies of renewable energy projects. The role of regulators and their influence on electricity prices were also discussed. Resource planning guidelines were examined as well as other topics such as demand side management, energy conservation, the role of liquefied natural gas in power generation, and land use challenges for power generation. The conference featured 21 presentations, of which 7 have been catalogued separately for inclusion in this database. tabs, figs

  12. The Bonneville Power Administration's geothermal program

    International Nuclear Information System (INIS)

    Darr, G.D.

    1990-01-01

    Despite being a power source with many desirable characteristics, geothermal has not been developed in the Pacific Northwest because of high costs, high risks, and the lack of a market for power. The region will require new power sources in the 1990s, and will need to know to what extent it can rely on geothermal. The Bonneville Power Administration has developed a geothermal RD and D program which includes a proposal to award power contracts to three pilot projects in the Northwest. Public outreach efforts, environmental base line studies, and economic and land use impact studies will also be undertaken. In this paper two projects already under way are discussed

  13. FY 1999 Annual Self-Evaluation Report of the Pacific Northwest National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Randy R. LaBarge

    1999-11-05

    This is a report of the Pacific Northwest National Laboratory's (Pacific Northwest's) FY1999 Annual Self-Evaluation Report. This report summarizes our progress toward accomplishment of the critical outcomes, objectives, and performance indicators as delineated in the FY1999 Performance Evaluation & Fee Agreement. It also summarizes our analysis of the results of Pacific Northwest's Division and Directorate annual self-assessments, and the implementation of our key operational improvement initiatives. Together, these provide an indication of how well we have used our Integrated Assessment processes to identify and plan improvements for FY2000. As you review the report you will find areas of significantly positive progress; you will also note areas where I believe the Laboratory could make improvements. Overall, however, I believe you will be quite pleased to note that we have maintained, or exceeded, the high standards of performance we have set for the Laboratory.

  14. 77 FR 11434 - Safety Zone; Patapsco River, Northwest and Inner Harbors, Baltimore, MD

    Science.gov (United States)

    2012-02-27

    ...-AA00 Safety Zone; Patapsco River, Northwest and Inner Harbors, Baltimore, MD AGENCY: Coast Guard, DHS... intended route immediately prior to, during, and following the scheduled towing evolution, vessel traffic... made to the maritime community via marine information broadcasts so mariners may adjust their plans...

  15. Public information - Northwest region of Russian Federation

    International Nuclear Information System (INIS)

    Saiapina, A.

    2001-01-01

    Regional Center of Public Information in Northwest region of Russian Federation is a part of the State Regional Educational Center of Ministry of the Russian Federation for atomic energy in St.-Petersburg, Russia (http://graph.runnet.ru/). This Center of Public Information (CPI) provides a wide range of information dealing with the nuclear power. The objectives of the CPI are: to conduct informational and educational activities so as to form a positive attitude toward atomic energy and nuclear technologies; to provide the population with a means reliable information about objects of potential risk; to organize an active exchange of the information with enterprises using nuclear technologies in the region. The main topics of informational support are these: electricity production, the ground of nuclear power, new Russian nuclear reactors, nuclear safety, nuclear power and environment, radioactivity, Leningrad nuclear power plant, responsibilities in nuclear engineering. (author)

  16. Early environmental planning: A process for power line corridor selection

    International Nuclear Information System (INIS)

    Haagenstad, T.; Bare, C.M.

    1998-01-01

    Los Alamos National Laboratory (LANL) conducted an environmental planning study in the fall of 1997 to help determine the best alternative for upgrading the Laboratory's electrical power system. Alternatives considered included an on-site power generation facility and two corridors for a 10-mile-long 115-kV power line. This planning process was conducted prior to the formal National Environmental Policy Act (NEPA) review. The goals were to help select the best proposed action, to recommend modifications and mitigation measures for each alternative for a more environmentally sound project, and to avoid potential delays once the formal Department of Energy review process began. Significant constraints existed from a planning perspective, including operational issues such as existing outdoor high explosives testing areas, as well as environmental issues including threatened and endangered species habitats, multiple archeological sites, contaminated areas, and aesthetics. The study had to be completed within 45 days to meet project schedule needs. The process resulted in a number of important recommendations. While the construction and operation of the on-site power generation facility could have minimal environmental impacts, the need for a new air quality permit would create severe cost and schedule constraints for the project. From an environmental perspective, construction and operation of a power line within either corridor was concluded to be a viable alternative. However, impacts with either corridor would have to be reduced through specific recommended alignment modifications and mitigation measures

  17. Stochastic Programming for Fuel Supply Planning of Combined Heat and Power Plants

    DEFF Research Database (Denmark)

    Guericke, Daniela; Blanco, Ignacio; Morales González, Juan Miguel

    The consumption of biomass to produce power and heat has increased due to the carbon neutral policies. Combined heat and power (CHP) plants often combine biomass with other fuels, e.g., natural gas. The negotiation process for supply contracts involves many uncertainties due to the long planning...... horizon. The demand for biomass is uncertain, and heat demand and electricity prices vary during the planning period. We propose a method using stochastic optimization to support the biomass and natural gas supply planning for CHP plants including short-term decisions for optimal market participation....

  18. 75 FR 18497 - Guidance on Simultaneous Transmission Import Limit Studies for the Northwest Region; Notice of...

    Science.gov (United States)

    2010-04-12

    ... updated market power analyses associated with their market based rate authorizations, which are due in... Conference ``Guidance on Simultaneous Transmission Import Limit Studies.'' To view the archive of the... Northwest region transmission owners and their pending updated market power analyses. Interested persons...

  19. Planning and development of the Spanish nuclear power programme

    International Nuclear Information System (INIS)

    Lopez-Rodriguez, M.

    1983-01-01

    The paper analyses the Spanish nuclear power programme from its inception to the present time, doing so within the context of the country, characterized by the fairly rapid change from a basically agricultural economy to an economy in which industry and services play an important part and the transformation of which took place mainly during the decade prior to the energy crisis 1973. Reference is made to the early establishment of the Junta de Energia Nuclear (Nuclear Energy Board) (JEN), which was set up as a research body even before nuclear energy became competitive with other sources for the production of electric power and which, by adapting its structure and programmes to the different phases in the development and utilization of nuclear energy in the country, contributed the necessary scientific, technical and legal infrastructure. There is also an analysis of the most striking features of the Spanish energy system and an account of the planning and construction of the first three Spanish nuclear power stations. A further subject of discussion is the energy planning and development projects devised by the Government which gave rise to the second generation of nuclear power plants, some of which are already in operation and the remainder in an advanced state of construction. Emphasis is placed on the action taken by the Spanish Government to increase the participation of Spanish industry in the construction of nuclear power plants and in the supply of equipment and services required for their operation. Reference is made to the experimental changes which have been made in the institutional infrastructure in order to adapt it to the phase of development which has been reached and to the objectives subsequently laid down in the planning: establishment of ENUSA (the national uranium enterprise), the Equipos Nucleares corporation and the Nuclear Safety Council, and also the changes made in the JEN

  20. Energy models for generation planning and midterm operation of hydrothermal power systems

    Energy Technology Data Exchange (ETDEWEB)

    Amthauer, E

    1981-01-01

    The aims of generation planning and midterm operation of a power system are reliable and economical load coverage at any moment. For solving some of the planning tasks, it is advantageous to use energy models, if a large amount of power is installed in hydro-storage plants. Energy models apply the probability of load coverage in a given period as a quantitative measure for a power system's reliability provided the availability of the transmission network is given. Reliability may be influenced by installing new plants (longterm) or by committing the existing plants in a particular fashion. An evaluation of these activities makes it possible to determine decisions which optimize a given object function. In this thesis, energy models for the Swiss hydrothermal power system are derived and tested by simulation. For this utility, energy supply during the emptying period of the storage plants in winter is of special interest. Therefore, the criteria for generation planning are derived by analysing the distribution functions of future energy balances in winter periods. The committment of the existing plants and energy exchange with other utilities in a straight following winter period are planned by means of a sequential decision process. It is shown how strategies for these planning tasks are found with the models. Those model parameters, having the highest influence on reliable and economical load coverage are extracted by means of sensitivity analysis.

  1. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  2. An effective heuristic for combined heat-and-power production planning with power ramp constraints

    International Nuclear Information System (INIS)

    Rong, Aiying; Lahdelma, Risto

    2007-01-01

    Combined heat-and-power (CHP) production is an increasingly important technology for its efficient utilization of primary-energy resources and for reducing CO 2 emissions. In the CHP plant, the generation of heat-and-power follows a joint characteristic, which makes the determination of both the marginal power production cost (MPPC) and the feasible operating region for the plant more complicated than for the power-only generation plant. Due to the interdependence between heat and power production, the power-ramp constraints, which limit how much the power production of a CHP plant may increase or decrease between two successive periods, may also imply constraints on the heat production. In this paper, we investigate the impact of power-ramp constraints on CHP production planning and develop a robust heuristic for dealing with the power-ramp constraints based on the solution to the problem with relaxed ramp-constraints (RRC). Numerical results based on realistic production models show that the heuristic can generate high-quality solutions efficiently. (author)

  3. Decentralized planning of hydroelectric power systems

    International Nuclear Information System (INIS)

    Binato, S.; Pereira, M.V.F.

    1995-01-01

    This paper discusses the application of marginal cost concepts to the expansion planning of hydroelectric systems. It is shown that the renumeration of hydroelectric plants should not be based on their energy production, as this leads to excessive revenues for the plant owner, and distorts the dimensioning of upstream reservoirs. In order to produce the adequate economic signals, it is necessary to separate the contributions of turbines and reservoirs. Examples from the Brazilian power system are presented and discussed

  4. Improving the steady-state loading margin to voltage collapse in the North-West Control Area of the Mexican Power System

    Energy Technology Data Exchange (ETDEWEB)

    Calderon-Guizar, J.G.; Inda-Ruiz, G.A.; Tovar, G.E. [Gerencia de Analisis de Redes, Temixco, Morelos (Mexico). Inst. de Investigaciones Eleectricas

    2003-10-01

    This paper reports the application of a static approach for assessing the steady-state loading margin to voltage collapse of the North-West Control Area (NWCA) of the Mexican Power System. The approach uses both optimal load flow (OLF) and conventional load flow (LF) solutions, and singular value decomposition of the load flow Jacobian matrix (J). Additionally, the approach allows to determine suitable locations for corrective actions such as, the addition of new equipment or load shedding. The results shows that the combination of OLF and LF resulted in a steady-state loading margin to voltage collapse of the NWCA 7.2% higher than the case when only conventional load flow solutions were considered. (author)

  5. Powering the people: India's capacity expansion plans

    Energy Technology Data Exchange (ETDEWEB)

    Patel, S.

    2009-05-15

    India has become a global business power even though hundreds of millions of its citizens still live in poverty. To sustain economic growth and lift its people out of poverty, India needs more and more reliable power. Details of government plans for achieving those goals demonstrate that pragmatism may be in shorter supply than ambition and political will. 1 ref., 12 figs., 1 tab.

  6. The socio-economic costs of the planned development of wind power energy

    International Nuclear Information System (INIS)

    Bentzen, J.

    1992-01-01

    The socio-economic consequences of the Danish government's planned further development of wind power energy are discussed in detail. It is claimed that, currently, electricity produced by wind turbines is more expensive than that produced by power stations, if the relative environmental effects are not taken into consideration. It is expected that technological development will contribute to cost reduction by the year 2010 so that electricity produced by wind turbines will be competitive, but until then costs of wind power energy will be high and it is reckoned that losses will be in the range of 5-6 billion Danish crowns, minus 2.5 billion saved by lack of CO 2 emission. The socio-economic factors regarding windmills of various sizes (150 kW and 225 kW) are calculated and the planned development of wind power until 2010 is explained. The socio-economic costs of the development programme under various conditions, including the calculation of the saved emissions of carbon dioxide, are discussed. The author states that, in the light of these arguments, he is not in agreement with the governmental plan for the development of wind-turbine produced electricity. It is suggested that this plan could be postponed until such time as wind-power produced electricity should be more competitive in price, and that it should not be pursued during a period of economic recession. (AB)

  7. Asotin Creek model watershed plan: Asotin County, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    The Northwest Power Planning Council completed its ''Strategy for Salmon'' in 1992. This is a plan, composed of four specific elements,designed to double the present production of 2.5 million salmon in the Columbia River watershed. These elements have been called the ''four H's'': (1) improve harvest management; (2) improve hatcheries and their production practices; (3) improve survival at hydroelectric dams; and (4) improve and protect fish habitat. The Asotin Creek Model Watershed Plan is the first to be developed in Washington State which is specifically concerned with habitat protection and restoration for salmon and trout. The plan is consistent with the habitat element of the ''Strategy for Salmon''. Asotin Creek is similar in many ways to other salmon-bearing streams in the Snake River system. Its watershed has been significantly impacted by human activities and catastrophic natural events, such as floods and droughts. It supports only remnant salmon and trout populations compared to earlier years. It will require protection and restoration of its fish habitat and riparian corridor in order to increase its salmonid productivity

  8. Interesting tools for the cybersecurity plan of a nuclear power plant

    International Nuclear Information System (INIS)

    Pareja, I.; Carrasco, J. A.; Cerro, F. J. del

    2012-01-01

    The use of digital technologies in monitoring and control systems of nuclear power plants and their connectivity requirements, originate cybersecurity difficulties that should be addressed in a cybersecurity plan. This plan should guide the policies and procedures followed during the design maintenance and operation of the systems inside a nuclear power plant. It also should refer to adequate tools able to reach the established cybersecurity requirements. The combination of Datadiodes and tools for publishing video(like tVGA2web), permit an isolation and remote maintenance in a 100% safety way and their use should be disseminated. In the paper other type of tools useful for nuclear power plants are also mentioned.

  9. Planning of emergency medical treatment in nuclear power plant

    International Nuclear Information System (INIS)

    Kusama, Tomoko

    1989-01-01

    Medical staffs and health physicists have shown deep concerning at the emergency plans of nuclear power plants after the TMI nuclear accident. The most important and basic countermeasure for accidents was preparing appropriate and concrete organization and plans for treatment. We have planed emergency medical treatment for radiation workers in a nuclear power plant institute. The emergency medical treatment at institute consisted of two stages, that is on-site emergency treatment at facility medical service. In first step of planning in each stage, we selected and treatment at facility medical service. In first step of planning in each stage, we selected and analyzed all possible accidents in the institute and discussed on practical treatments for some possible accidents. The manuals of concrete procedure of emergency treatment for some accidents were prepared following discussion and facilities and equipment for medical treatment and decontamination were provided. All workers in the institute had periodical training and drilling of on-site emergency treatment and mastered technique of first aid. Decontamination and operation rooms were provided in the facillity medical service. The main functions at the facility medical service have been carried out by industrial nurses. Industrial nurses have been in close co-operation with radiation safety officers and medical doctors in regional hospital. (author)

  10. Nuclear power enterprise tax planning strategy in the background of reform

    International Nuclear Information System (INIS)

    Wu Yimin

    2012-01-01

    The success of tax planning can be converted into enterprise's productivity, tax planning strategy can maximize the desired effects and bring out its full play to tax planning. Taking new round of tax reform in 12th five-year-plan and the reformation of professional groups as the background, the author detailedly conceived a frame of corporate tax planning strategy for nuclear power enterprises of China National Nuclear Corporation at the forefront of reformation from an all-round comprehensive view and multi-angle stand. (author)

  11. Visions, Scenarios and Action Plans Towards Next Generation Tanzania Power System

    Directory of Open Access Journals (Sweden)

    Alex Kyaruzi

    2012-10-01

    Full Text Available This paper presents strategic visions, scenarios and action plans for enhancing Tanzania Power Systems towards next generation Smart Power Grid. It first introduces the present Tanzanian power grid and the challenges ahead in terms of generation capacity, financial aspect, technical and non-technical losses, revenue loss, high tariff, aging infrastructure, environmental impact and the interconnection with the neighboring countries. Then, the current initiatives undertaken by the Tanzania government in response to the present challenges and the expected roles of smart grid in overcoming these challenges in the future with respect to the scenarios presented are discussed. The developed scenarios along with visions and recommended action plans towards the future Tanzanian power system can be exploited at all governmental levels to achieve public policy goals and help develop business opportunities by motivating domestic and international investments in modernizing the nation’s electric power infrastructure. In return, it should help build the green energy economy.

  12. Energy and nuclear power planning in developing countries

    International Nuclear Information System (INIS)

    1985-01-01

    In this publication of the IAEA, after the introduction, four substantive parts follow. Part I, Energy demand and rational energy supply, deals with the needs for energy, primary energy resources and reserves, energy transport, storage, distribution and conservation, including the environmental effects on energy development. Part II, Economic aspects of energy development, presents an integrated view of the basic concepts of energy economics, evaluation of alternative energy projects with an in-depth comparison of electricity generation costs of nuclear and fossil-fuelled power plants. Part III, World energy development status and trends, begins with an overview of the world energy status and trends and continues with a presentation of the energy situation in industrialized countries and in developing countries. Part IV, Energy planning, deals with the optimization techniques, energy planning concepts and computerized models. The launching conditions and implementation of a nuclear power programme are described in detail. 582 references are given in the text and a bibliographical list of 356 titles has been added

  13. Sustainable power planning for the island of Crete

    International Nuclear Information System (INIS)

    Giatrakos, Georgios P.; Tsoutsos, Theocharis D.; Zografakis, Nikos

    2009-01-01

    Crete, as one of the largest and most touristic islands of the Mediterranean, is facing abrupt population and economic growth tendencies that result in the incessant problem of inability to meet power demand increase. This paper evaluates the island's present electrical energy status, and examines the possibility of further penetration of sustainable energy. Various energy modelling software solutions are examined and evaluated, in order to form scenarios according to the governmental and EU directives for renewable energy sources (RES), as well as to the planned conventional power plant upgrades and LNG transition. RES are fully exploited in the plan's scenarios, always taking into account all technical and legislative limitations. Analysis shows that even the most modest and realistic RES implementation scenarios, combined with a partially successful demand restriction, could indeed contract the island's environmental footprint. RES penetration in Crete's electric seems to be able to surpass 30% by 2020, surpassing even the optimistic EU targets for 20% RES by 2020

  14. Planning and Resource Management in an Intelligent Automated Power Management System

    Science.gov (United States)

    Morris, Robert A.

    1991-01-01

    Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

  15. Indices for planning wind power generation; Furyoku hatsuden no keikaku shihyo

    Energy Technology Data Exchange (ETDEWEB)

    Takeuchi, H

    1997-11-25

    Outlined herein are status of wind power generation development, indices for planning development, and actual development results. At present, wind power generates electric power of 6,781MW worldwide. USA has been rapidly developing wind power generation since enactment of the PURPA law, and accounted for 25% of the world output in the past. However, the county is recently unseated from the world top position by Germany, which has been extensively developing wind power generation since enactment of the EFL law to reach 1,799MW. In Japan, electric power companies, local governments and public institutions have been positively introducing wind mills since 1992, when Tohoku Electric Power Co. built Ryuhi Wind Park, now generating a total power of 15MW by 64 units located at 33 different points. According to the surveys by NEDO on wind conditions, there are a number of districts suited for wind mills in Hokkaido, Tohoku, Okinawa and sea areas in Honshu. The indices described herein for planning wind power generation include rotor diameter, tower height, speed of rotation, weight, power to be generated, utilization and service factors, noise level, and investment and running costs. In the present state of the development of wind power generation in Japan, development points are 33, generated ouptut 15,097kW and units 64. 14 figs.

  16. Slovenske elektrarne has fulfilled the plan of electric power production at 101 %

    International Nuclear Information System (INIS)

    Anon

    2004-01-01

    Slovenske elektrarne, a. s., produced in 2003 year the electric power in capacity 26,047.6 GWh, whereby they fulfilled business plan at 101 %. In compare with the last year it is a reduction in production by 1,397.3 GWh. The biggest share of production - till 68.6 % of overall production of the Slovenske elektrarne, was provided by nuclear sources. Nuclear power plants fulfilled business plan at 104 %, when Jaslovske Bohunice NPP has produced 11,625 GWh and Mochovce NPP 6,238 GWh. The share of other power plants on the electricity production is presented

  17. Planning and management of outages in nuclear power plants

    International Nuclear Information System (INIS)

    Sica, G.F.; Fusari, W.; Reginelli, A.

    1984-01-01

    At present the Ente Nazionale per l'Energia Elettrica (ENEL) operates three nuclear power plants, only one of which belongs to the new generation, i.e. the Caorso Nuclear Power Plant which has been in commercial operation since December 1981. Outage planning, implementation and analysis are very important in order to minimize the shutdown time and thus improve plant availability, which is of particular importance for a large nuclear power plant. Such activities are very complicated because of the large number of jobs that have to be performed in accordance with detailed written procedures and which have to be properly documented and controlled. Large off-site resources are required which have to be accurately interfaced with on-site staff. The ENEL is making a great effort to define both the administrative and technical aspects of refuelling outages. As outage planning requires the availability and handling of a large amount of data and information, a maintenance information system that has been widely used in conventional plants was applied, with some modifications made especially for the Caorso Nuclear Power Plant. After two years the following results have been achieved: a large number of raw and processed data are now available, the first refuelling outage was carried out with few problems and according to schedule, and the second refuelling outage, based on the experience of the first, required somewhat less preparation and is developing well even though many special activities have had to be scheduled. The ENEL believes that the efforts made in the planning and management areas will pay off in terms of the short duration, smoothness and economy of further outages, both for Caorso and for future plants. (author)

  18. Present state and long term planning on nuclear power plants in principal countries in the world

    International Nuclear Information System (INIS)

    Nomura, Junichi

    1978-01-01

    The situation of nuclear power stations and the long term planning in each major country in the world were summarized, but the situation is changing from time to time, therefore it is difficult to make the long term prediction. The advanced countries in terms of nuclear power established the long term plans to adopt nuclear power generation largely owing to the oil crisis, but thereafter the revision was carried out again and again in respective countries. The developing countries already started the operation of nuclear power generation occupy only 2 to 3% of the total installed capacity in the world, but the countries constructing or planning nuclear power generation are many, and if the operation will be started as scheduled, their capacity will reach 30 million kW by 1985, and occupy about 10% of the total installed capacity of nuclear power generation in the world. As for the range of investigation of this report, the countries where the long term plans are unknown or the number of construction is small, Japan, Great Britain, USA and communist countries are excluded. As a rule, the light water reactors with power output of more than 200,000 kW are listed. The number of nuclear power plants in operation, under construction and in planning stage, national situation, long term plan, and others in each country are described. (Kako, I.)

  19. Study on optimization of normal plant outage work plan for nuclear power plants

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Kodama, Noriko; Takase, Kentaro; Miya, Kenzo

    2011-01-01

    This paper discusses maintenance optimization in maintenance implementation stage following maintenance planning stage in nuclear power plants and proposes a methodology to get an optimum maintenance work plan. As a result of consideration, the followings were obtained. (1) The quantitative evaluation methodology for optimizing maintenance work plan in nuclear power plants was developed. (2) Utilizing the above methodology, a simulation analysis of maintenance work planning for BWR's PLR and RHR systems in a normal plant outage was performed. Maintenance cost calculation in several cases was carried out on the condition of smoothening man loading over the plant outage schedule as much as possible. (3) As a result of the simulation, the economical work plans having a flat man loading over the plant outage schedule were obtained. (author)

  20. Biomass Supply Planning for Combined Heat and Power Plants using Stochastic Programming

    DEFF Research Database (Denmark)

    Guericke, Daniela; Blanco, Ignacio; Morales González, Juan Miguel

    method using stochastic optimization to support the biomass supply planning for combined heat and power plants. Our two-phase approach combines mid-term decisions about biomass supply contracts with the short-term decisions regarding the optimal market participation of the producer to ensure......During the last years, the consumption of biomass to produce power and heat has increased due to the new carbon neutral policies. Nowadays, many district heating systems operate their combined heat and power (CHP) plants using different types of biomass instead of fossil fuel, especially to produce......, and heat demand and electricity prices vary drastically during the planning period. Furthermore, the optimal operation of combined heat and power plants has to consider the existing synergies between the power and heating systems while always fulfilling the heat demand of the system. We propose a solution...

  1. Pacific Northwest Laboratory plan to maintain radiation exposure as low as reasonably achievable (ALARA)

    International Nuclear Information System (INIS)

    Higby, D.P.; Denovan, J.T.

    1982-12-01

    This document describes the radiation safety program at the Pacific Northwest Laboratory (PNL). The practices and administrative policies of this program support the principles of ALARA (to maintain radiation exposure as low as reasonably achievable). This document also describes a program to establish safety goals at PNL to help ensure that operations are conducted according to ALARA principles

  2. Quality of family planning services in Northwest Ethiopia | Fantahun ...

    African Journals Online (AJOL)

    Background: The unmet need for family planning services in Ethiopia is believed to be high (36%) while the already available services do not appear to be optimally used by potential clients. It is thus expected that an assessment and improvement of the quality of family planning services could enhance family planning ...

  3. The interplay of governance, power and citizen participation in community tourism planning

    Science.gov (United States)

    E.J. Jordan; C.A. Vogt; Linda Kruger; N. Grewe

    2013-01-01

    This research examines a unique case of tourism planning and explores the relationships between governance, power, and citizen participation in community decision-making. In less than two years, the community of Sitka, Alaska, undertook two separate tourism-planning processes in response to proposed tourism development. The first plan followed a participant-led...

  4. Developing and assessing accident management plans for nuclear power plants

    International Nuclear Information System (INIS)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A.

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate

  5. Foreword for the Special Section on Power System Planning and Operation Towards a Low-Carbon Economy

    Energy Technology Data Exchange (ETDEWEB)

    Ding, Yi; Kang, Chongqing; Wang, Jianhui; Chen, Yihsu; Hobbs, Benjamin F.

    2015-03-01

    The nine papers in this special section on power system planning and operation towards a low-cost economy cover the following topics: power system planning models; power system operation methods and market behavior analysis; and risk assessment and emission management.

  6. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  7. Presentation plan of the reconstruction and upgrade hydroelectric power plant 'Zvornik'

    Directory of Open Access Journals (Sweden)

    Krstić Dušan B.

    2016-01-01

    Full Text Available By the basic project of the energy utilization of the middle part of the river Drina (from Višegrad to Zvornik building of five large hydroelectric power plants was planned. Hydroelectric power plant near Zvornik had the greatest advantage, and it is the first built. Hydroelectric power plant 'Zvornik' separates the river Drina, about 1 km upstream from Mali Zvornik in Serbia and Zvornik in Bosnia and Herzegovina. In order to extend the work life, by the urban development project was planned modernization of production aggregates and associated equipment, the upgrade of annexes above the aggregate siphons A1 and A2, as well as the upgrade of the annexes of the powerhouse on the right bank of the river in the function of accommodation of electrical equipment. By replacing of the vital parts of turbines with increasing diameter with an increase of efficiency, Bow and power, as well as replacing generators with new generator of higher power with excitation and all the necessary auxiliary equipment, will ensure reliable operation of the hydroelectric power plant and will extend the working life of the next 40 years, creating opportunities for retrofitting additional fifth unit.

  8. DYNAMIC PROGRAMMING – EFFICIENT TOOL FOR POWER SYSTEM EXPANSION PLANNING

    Directory of Open Access Journals (Sweden)

    SIMO A.

    2015-03-01

    Full Text Available The paper isfocusing on dynamic programming use for power system expansion planning (EP – transmission network (TNEP and distribution network (DNEP. The EP problem has been approached from the retrospective and prospective point of view. To achieve this goal, the authors are developing two software-tools in Matlab environment. Two techniques have been tackled: particle swarm optimization (PSO and genetic algorithms (GA. The case study refers to Test 25 buses test power system developed within the Power Systems Department.

  9. Generation expansion planning of the electrical power system in West Java

    International Nuclear Information System (INIS)

    Nengah Sudja.

    1975-01-01

    A thorough study on the generation expansion planning of the electrical power system, covering mathematical and computerized calculations, and financial analysis on the daily load, the load duration, and the assumption of future load, supporting the idea for building nuclear power plants in Indonesia, is presented. (RUW)

  10. Method for assigning sites to projected generic nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Holter, G.M.; Purcell, W.L.; Shutz, M.E.; Young, J.R.

    1986-07-01

    Pacific Northwest Laboratory developed a method for forecasting potential locations and startup sequences of nuclear power plants that will be required in the future but have not yet been specifically identified by electric utilities. Use of the method results in numerical ratings for potential nuclear power plant sites located in each of the 10 federal energy regions. The rating for each potential site is obtained from numerical factors assigned to each of 5 primary siting characteristics: (1) cooling water availability, (2) site land area, (3) power transmission land area, (4) proximity to metropolitan areas, and (5) utility plans for the site. The sequence of plant startups in each federal energy region is obtained by use of the numerical ratings and the forecasts of generic nuclear power plant startups obtained from the EIA Middle Case electricity forecast. Sites are assigned to generic plants in chronological order according to startup date.

  11. Method for assigning sites to projected generic nuclear power plants

    International Nuclear Information System (INIS)

    Holter, G.M.; Purcell, W.L.; Shutz, M.E.; Young, J.R.

    1986-07-01

    Pacific Northwest Laboratory developed a method for forecasting potential locations and startup sequences of nuclear power plants that will be required in the future but have not yet been specifically identified by electric utilities. Use of the method results in numerical ratings for potential nuclear power plant sites located in each of the 10 federal energy regions. The rating for each potential site is obtained from numerical factors assigned to each of 5 primary siting characteristics: (1) cooling water availability, (2) site land area, (3) power transmission land area, (4) proximity to metropolitan areas, and (5) utility plans for the site. The sequence of plant startups in each federal energy region is obtained by use of the numerical ratings and the forecasts of generic nuclear power plant startups obtained from the EIA Middle Case electricity forecast. Sites are assigned to generic plants in chronological order according to startup date

  12. Least cost planning within the service concept of power supply companies

    International Nuclear Information System (INIS)

    Lueschen, H.; Sonntag, J.; Werner, R.

    1995-01-01

    In discussing the implementation of energy service concepts, German power supply companies are gradually adopting categories originating from the USA, namely integrated resources planning (IRP), least cost planning (LCP), and demand-side management (DSM). While the activities of German power supply companies are more encompassing than those of their US counterparts in the traditional features of DSM such as load management, information, and consulting, further-going measures such as direct investment and financial incentive programmes for exploiting energy-saving potentials play a less important role and are controversial in the energy-political debate. The article presents the concept of power supply companies for implementing IRP/LCP and makes a concrete assessment of the worth and efficiency of consulting compared with the newer type of financial incentive programmes. (orig.) [de

  13. Nuclear power as an option in electrical generation planning for Croatia

    International Nuclear Information System (INIS)

    Feretic, D.; Tomsic, Z.; Cavlina, N.; Kovacevic, T.

    2000-01-01

    The expected increase of electricity consumption in the next two decades, if covered mainly by domestic production, will require roughly 4500 MW of new installed capacity. The question is which resource mix would be optimal for the future power plants. Taking into account lack of domestic resources for electricity generation, current trends in the European energy markets, and environmental impact of various energy technologies, it seems reasonable for Croatia to keep the nuclear option open in the future energy planning. In line with that conclusion, this paper analyzes how the introduction of nuclear power plants would influence future power system expansion plans in Croatia, and the possibility to meet the Kyoto requirement. The effects of CO 2 emission tax and external costs on the optimal capacity mix and the emissions levels are also examined. (author)

  14. Hydropower operations data management at Bonneville Power Administration

    International Nuclear Information System (INIS)

    Dies, R.

    2006-01-01

    The decision support software used by Bonneville Power Administration (BPA) in its operation of the Federal Columbia River Power System in the Pacific northwest was presented along with examples of water resources data and information regarding weather and stream flow. Water resources data is used extensively in hydropower operations for planning purposes through to real-time operations. This includes long-term historical hydrology and realtime system information on snow cover, river discharges and water elevations. Since the data comes from many different sources, the quality and frequency varies, with sample intervals ranging from seconds to days. Some data may be intermittent and transmitted only when thresholds are reached. Data can be communication via SCADA telemetry, the Internet, direct satellite feed, telephone or fax. The key requirement for a decision support system is the reliable and easily accessed compilation of all this data. The BPA uses long-term planning models, system-wide generation scheduling applications, and near-real-time optimization of generating units. It was suggested that the hydrologic forecasting community could benefit from the utility's experience using these applications. tabs., figs

  15. Harvesting cost model for small trees in natural stands in the interior northwest.

    Science.gov (United States)

    Bruce R. Hartsough; Xiaoshan Zhang; Roger D. Fight

    2001-01-01

    Realistic logging cost models are needed for long-term forest management planning. Data from numerous published studies were combined to estimate the costs of harvesting small trees in natural stands in the Interior Northwest of North America. Six harvesting systems were modeled. Four address gentle terrain: manual log-length, manual whole-tree, mechanized whole-tree,...

  16. Coal Power Systems strategic multi-year program plans

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  17. Integrating Photovoltaic Systems in Power System: Power Quality Impacts and Optimal Planning Challenges

    Directory of Open Access Journals (Sweden)

    Aida Fazliana Abdul Kadir

    2014-01-01

    Full Text Available This paper is an overview of some of the main issues in photovoltaic based distributed generation (PVDG. A discussion of the harmonic distortion produced by PVDG units is presented. The maximum permissible penetration level of PVDG in distribution system is also considered. The general procedures of optimal planning for PVDG placement and sizing are also explained in this paper. The result of this review shows that there are different challenges for integrating PVDG in the power systems. One of these challenges is integrated system reliability whereas the amount of power produced by renewable energy source is consistent. Thus, the high penetration of PVDG into grid can decrease the reliability of the power system network. On the other hand, power quality is considered one of the challenges of PVDG whereas the high penetration of PVDGs can lead to more harmonic propagation into the power system network. In addition to that, voltage fluctuation of the integrated PVDG and reverse power flow are two important challenges to this technology. Finally, protection of power system with integrated PVDG is one of the most critical challenges to this technology as the current protection schemes are designed for unidirectional not bidirectional power flow pattern.

  18. Flexible power generation systems and their planning

    International Nuclear Information System (INIS)

    Schwarzenbach, A.; Wunsch, A.K.

    1989-01-01

    By determining their specific annual costs and expressing them in relation to the period of utilization or to the load factor, it is possible to compare the relative merits of different combinbations of power generation systems. This method, with which unsuitable planning variants can be eliminated without having to go through long, intricate calculations and without taking up costly computer time, has the advantage that it points up the origin of the costs and at the same time makes clear how improvement can be achieved by combining base-load, medium-load and peak-load plants. The different types of power plant (hydro-electric, nuclear, steam, gas-turbine, combined cycle, cogeneration and coal gasification) are characterized by their approximate specific capital investment, construction period, efficiency, fuel, duty, and time from cold start to full load. They are compared by plotting their total specific annual costs in SFr/kWa against the load factor. The special benefits which combined cycle plants, with gas turbines, heat-recovery boilers and steam plant, can offer today (not only high fuel utilization and relatively low first-time costs, but also the short time needed for planning and construction) are underlined. 5 refs.; 9 figs.; 3 tabs

  19. Study of operating procedures in nuclear power plants: Practices and problems

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; McGuire, M.V.; Radford, L.R.; Wheeler, W.A.

    1987-02-01

    This report describes the project activities, findings, and recommendations of a project entitled ''Program Plan for Assessing and Upgrading Operating Procedures for Nuclear Power Plants.'' The project was performed by the Pacific Northwest Laboratory and Battelle Human Affairs Research Centers for the Division of Human Factors Technology, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission (NRC). The project team analyzed and evaluated samples of normal and abnormal operating procedures from 31 commercial nuclear power plant sites operating in the United States. The project team also visited nine nuclear power plants in the United States to obtain information on the development, use, and control of operating procedures. A peer review group was convened to advise the project team on the conduct of the project and to review and comment on the project report. The report contains findings on the usability of operating procedures and on practices concerning the development, use, an control of operating procedures in nuclear power plants. The report includes recommendations to the NRC on the need to upgrade the quality of operating procedures. The report also discusses an approach to a program plan to assess and upgrade operating procedures

  20. Dungeness Power Station off-site emergency plan

    International Nuclear Information System (INIS)

    1993-01-01

    This off-site Emergency Plan in the event of an accidental release of radioactivity at the Dungeness Nuclear power station sets out the necessary management and coordination processes between Nuclear Electric, operators of the site, the emergency services and relevant local authorities. The objectives promoting the aim are identified and the activities which will be undertaken to protect the public and the environment in the event of an emergency are outlined. (UK)

  1. Design, Results and Plans for Power Beaming Competitive Challenge

    International Nuclear Information System (INIS)

    Shelef, Ben

    2008-01-01

    In our context, Power Beaming refers to the extraction of useable electrical power from a directed electromagnetic beam. In order to promote interest in this technology, the Spaceward Foundation proposed and is managing a technology prize challenge based on a Space Elevator design scenario. The challenge has a prize purse of $2M, provided by NASA's Centennial Challenges office. This paper covers the considerations that went into the design of the challenge, a brief chronology of past results, and plans for the future

  2. Electric utility system planning studies for OTEC power integration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-11-30

    Florida Power Corporation (FPC) conducted an evaluation of the possible integration of OTEC into the FPC system. Existing system planning procedures, assumptions, and corporate financial criteria for planning new generating capacity were used without modification. A baseline configuration for an OTEC plant was developed for review with standard planning procedures. The OTEC plant characteristics and costs were incorporated in considerable detail. These basic inputs were examined using the FPC system planning methods. It was found that with the initial set of conditions, OTEC would not be economically viable. Using the same system planning procedures, a number of adjustments were made to the key study assumptions. It was found that two considerations dominate the analysis; the assumed rate of fuel cost escalation, and the projected capital cost of the OTEC plant. The analysis produced a parametric curve: on one hand, if fuel costs were to escalate at a rate greater than assumed (12% vs the assumed 5% for coal), and if no change were made to the OTEC input assumptions, the basic economic competitive criteria would be equivalent to the principal alternative, coal fueled plants. Conversely, if the projected cost of the OTEC plant were to be reduced from the assumed $2256/kW to $1450/kW, the economic competitiveness criterion would be satisfied. After corporate financial analysis, it was found that even if the cost competitive criterion were to be reached, the plan including OTEC could not be financed by Florida Power Corporation. Since, under the existing set of conditions for financing new plant capital requirements, FPC could not construct an OTEC plant, some other means of ownership would be necessary to integrate OTEC into the FPC system. An alternative such as a third party owning the plant and selling power to FPC, might prove attractive. (WHK)

  3. Pulsed Power: Sandia's Plans for the New Millenium

    International Nuclear Information System (INIS)

    Quintenz, Jeffrey P.

    2000-01-01

    Pulsed power science and engineering activities at Sandia National Laboratories grew out of a programmatic need for intense radiation sources to advance capabilities in radiographic imaging and to create environments for testing and certifying the hardness of components and systems to radiation in hostile environments. By the early 1970s, scientists in laboratories around the world began utilizing pulsed power drivers with very short (10s of nanoseconds) pulse lengths for Inertial Confinement Fusion (ICF) experiments. In the United States, Defense Programs within the Department of Energy has sponsored this research. Recent progress in pulsed power, specifically fast-pulsed-power-driven z pinches, in creating temperatures relevant to ICF has been remarkable. Worldwide developments in pulsed power technologies and increased applications in both defense and industry are contrasted with ever increasing stress on research and development tiding. The current environment has prompted us at Sandia to evaluate our role in the continued development of pulsed power science and to consider options for the future. This presentation will highlight our recent progress and provide an overview of our plans as we begin the new millennium

  4. Learning from urban growth management in the Pacific Northwest

    DEFF Research Database (Denmark)

    Fertner, Christian

    2010-01-01

    The development of contemporary urban growth management in the Northwest United States began in the 1970s. The major tool is the implementation of urban containment boundaries, fostering growth within and limiting it outside the boundary. Additionally a set of policies reaching from densification...... Washington and Oregon as e.g. the municipalities in Denmark have strong control options in planning. However, especially the metropolitan co-operation and co-ordination instruments can certainly contribute to the discussion on urban growth management in Denmark and elsewhere....

  5. POWER SYSTEM PLANNING USING ANN WITH FUZZY LOGIC AND WAVELET ANALYSIS

    Directory of Open Access Journals (Sweden)

    V. Dharma Dharshin

    2016-10-01

    Full Text Available The electricity load required for the forthcoming years are predetermined by means of power system planning. Accuracy is the crucial factor that must be taken care of in the power system planning. Electricity is generally volatile, that is it changes and hence appropriate estimation must be done without leading to overestimation or underestimation. The aim of the project is to do appropriate power estimation with the help of the economic factors. The 9 input factors used are GDP, industry, imports, CO2 emission, exports, services, manufacturing, population, per capita consumption. The proposed methodology is done by means of Neural Network concept and Wavelet Analysis. Regression Analysis is also performed and the comparisons are done using Fuzzy Logic. The nonlinear model, Artificial Neural Network and the Wavelet Analysis are found to be more accurate and effective.

  6. A stochastic MILP energy planning model incorporating power market dynamics

    International Nuclear Information System (INIS)

    Koltsaklis, Nikolaos E.; Nazos, Konstantinos

    2017-01-01

    Highlights: •Stochastic MILP model for the optimal energy planning of a power system. •Power market dynamics (offers/bids) are incorporated in the proposed model. •Monte Carlo method for capturing the uncertainty of some key parameters. •Analytical supply cost composition per power producer and activity. •Clean dark and spark spreads are calculated for each power unit. -- Abstract: This paper presents an optimization-based methodological approach to address the problem of the optimal planning of a power system at an annual level in competitive and uncertain power markets. More specifically, a stochastic mixed integer linear programming model (MILP) has been developed, combining advanced optimization techniques with Monte Carlo method in order to deal with uncertainty issues. The main focus of the proposed framework is the dynamic formulation of the strategy followed by all market participants in volatile market conditions, as well as detailed economic assessment of the power system’s operation. The applicability of the proposed approach has been tested on a real case study of the interconnected Greek power system, quantifying in detail all the relevant technical and economic aspects of the system’s operation. The proposed work identifies in the form of probability distributions the optimal power generation mix, electricity trade at a regional level, carbon footprint, as well as detailed total supply cost composition, according to the assumed market structure. The paper demonstrates that the proposed optimization approach is able to provide important insights into the appropriate energy strategies designed by market participants, as well as on the strategic long-term decisions to be made by investors and/or policy makers at a national and/or regional level, underscoring potential risks and providing appropriate price signals on critical energy projects under real market operating conditions.

  7. Indicators for management of planned outages in nuclear power plants

    International Nuclear Information System (INIS)

    2006-04-01

    The outages considered within the scope of this publication are planned refuelling outages (PWR and BWR nuclear power plants) and planned outages associated with major maintenance, tests and inspections (PHWR and LWGR nuclear power plants). The IAEA has published some valuable reports providing guidance and assistance to operating organizations on outage management. This TECDOC outlines main issues to be considered in outage performance monitoring and provides guidance to operating organizations for the development and implementation of outage programmes which could enhance plant safety, reliability and economics. It also complements the series of reports published by the IAEA on outage management and on previous work related to performance indicators developed for monitoring different areas of plant operation, such as safety, production, reliability and economics. This publication is based upon the information presented at a technical meeting to develop a standardized set of outage indicators for outage optimization, which was organised in Vienna, 6-9 October 2003. At this meeting, case studies and good practices relating to performance indicator utilization in the process of planned outage management were presented and discussed

  8. Computerized planning system for nuclear power plant evaluation

    International Nuclear Information System (INIS)

    Bonczek, R.H.; Holsapple, C.W.; Whinston, A.B.

    1976-01-01

    A computerized system is described for information storage and query processing adapted to complex socio-technological issues. The system is referred to as GPLAN (Generalized Planning System) and can accommodate both qualitative (verbal) and quantitative data. The issue illustrated is the construction of a nuclear power plant, and involves interdisciplinary research and planning. The system's outstanding features are the use of the network variety of data base, the selective retrieval of any configuration of data from a particular network structure, automatic execution of any desired application program from a standard or special library of applications, user interface with a data base and applications by submitting English-like, non-procedural queries, and generality which allows tailoring to specific applications and provides a basis for integration of planning and research activities. The system is general and can be used for a wide variety of socio-technological issues which involve complex data relationships

  9. Planning for a space infrastructure for disposal of nuclear space power systems

    International Nuclear Information System (INIS)

    Angelo, J. Jr.; Albert, T.E.; Lee, J.

    1989-01-01

    The development of safe, reliable, and compact power systems is vital to humanity's exploration, development, and, ultimately, civilization of space. Nuclear power systems appear to present to offer the only practical option of compact high-power systems. From the very beginning of US space nuclear power activities, safety has been a paramount requirement. Assurance of nuclear safety has included prelaunch ground handling operations, launch, and space operations of nuclear power sources, and more recently serious attention has been given to postoperational disposal of spent or errant nuclear reactor systems. The purpose of this paper is to describe the progress of a project to utilize the capabilities of an evolving space infrastructure for planning for disposal of space nuclear systems. Project SIREN (Search, Intercept, Retrieve, Expulsion - Nuclear) is a project that has been initiated to consider post-operational disposal options for nuclear space power systems. The key finding of Project SIREN was that although no system currently exists to affect the disposal of a nuclear space power system, the requisite technologies for such a system either exist or are planned for part of the evolving space infrastructure

  10. Incorporating energy efficiency into electric power transmission planning: A western United States case study

    International Nuclear Information System (INIS)

    Barbose, Galen L.; Sanstad, Alan H.; Goldman, Charles A.

    2014-01-01

    Driven by system reliability goals and the need to integrate significantly increased renewable power generation, long-range, bulk-power transmission planning processes in the United States are undergoing major changes. At the same time, energy efficiency is an increasing share of the electricity resource mix in many regions, and has become a centerpiece of many utility resource plans and state policies as a means of meeting electricity demand, complementing supply-side sources, and reducing carbon dioxide emissions from the electric power system. The paper describes an innovative project in the western United States to explicitly incorporate end-use efficiency into load forecasts – projections of electricity consumption and demand – that are a critical input into transmission planning and transmission planning studies. Institutional and regulatory background and context are reviewed, along with a detailed discussion of data sources and analytical procedures used to integrate efficiency into load forecasts. The analysis is intended as a practical example to illustrate the kinds of technical and institutional issues that must be addressed in order to incorporate energy efficiency into regional transmission planning activities. - Highlights: • Incorporating energy efficiency into electric power transmission planning is an emergent analytical and policy priority. • A new methodology for this purpose was developed and applied in the western U.S. transmission system. • Efficiency scenarios were created and incorporated into multiple load forecasts. • Aggressive deployment of efficiency policies and programs can significantly reduce projected load. • The approach is broadly applicable in long-range transmission planning

  11. Maintenance planning for nuclear power plants

    International Nuclear Information System (INIS)

    Mattu, R.K.; Cooper, S.E.; Lauderdale, J.R.

    2004-01-01

    Maintenance planning for nuclear power plants is similar to that in other industrial plants but it is heavily influenced by regulatory rules, with consequent costs of compliance. Steps by the nuclear industry and the Nuclear Regulatory Commission to address that problem include development of guidelines for maintenance of risk-critical equipment, using PRA-based techniques to select a set of equipment that requires maintenance and reliability-centered maintenance (RCM) approaches for determining what maintenance is required. The result of the process is a program designed to ensure effective maintenance of the equipment most critical to plant safety. (author)

  12. Coal Power Systems strategic multi-year program plans; TOPICAL

    International Nuclear Information System (INIS)

    None

    2001-01-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL)

  13. 76 FR 15307 - Notice of Staff Attendance at Southwest Power Pool Strategic Planning Committee Meeting

    Science.gov (United States)

    2011-03-21

    ... Power Pool Strategic Planning Committee Meeting The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meeting of the Southwest Power Pool, Inc. (SPP) Strategic Planning Committee (SPC), as noted below. Their attendance is part of the Commission's ongoing outreach...

  14. Electric-power systems planning and greenhouse-gas emission management under uncertainty

    International Nuclear Information System (INIS)

    Li, Y.P.; Huang, G.H.

    2012-01-01

    Highlight: ►A multistage stochastic integer programming model is developed for planning electric-power systems. ►Uncertain and dynamic information can be incorporated within a multilayer scenario tree. ►This can help minimize system cost under random energy demand and greenhouse gas (GHG) abatement goal. ►Results can support decisions of facility expansion, electricity supply and GHG mitigation. - Abstract: In this study, a multistage interval-stochastic integer programming model is formulated for managing greenhouse gas (GHG) emissions and planning electric-power systems under uncertainty. The developed model can reflect dynamic, interactive, and uncertain characteristics of energy systems. Besides, the model can be used for answering questions related to types, times, demands and mitigations of energy systems planning practices, with the objective of minimizing system cost over a long-time planning horizon. The solutions can help generate electricity-generation schemes and capacity-expansion plans under different GHG-mitigation options and electricity-demand levels. Tradeoffs among system cost, energy security, and emission management can also be tackled. A high system cost will increase renewable energy supply and reduce GHG emission, while a desire for a low cost will run into risks of a high energy deficiency and a high GHG emission.

  15. Levelling the playing field? The influence of national wind power planning instruments on conflicts of interests in a Swedish county

    International Nuclear Information System (INIS)

    Bergek, Anna

    2010-01-01

    Slow and complicated wind power planning and permitting procedures have been a large obstacle for wind power diffusion in Sweden and other countries. This paper complements previous siting-oriented literature with a planning perspective on these problems. The focus is two national planning instruments implemented in Sweden in the early 2000s: a national planning target and an appointment of areas of national interest for wind power. The paper identifies different types of conflicts of interest related to wind power - in addition to the conflict between wind power as a national public interest and various local private interests - and analyses the impact of the national planning instruments on the handling of these conflicts in the land-use planning process in the County of Ostergoetland. The analysis shows that the planning target actually made local planning officials even more inclined to treat wind power as a private rather than a public interest and that the method used to identify areas of national interest of wind power forced wind power to compete with the combined strengths of all other public interest. The planning instruments thus left wind power to fight an uphill battle rather than to meet other interests face-to-face on a level playing field.

  16. Plan of disaster prevention in district of Shizuoka Prefecture countermeasures to nuclear power. 1984 ed.

    International Nuclear Information System (INIS)

    1984-01-01

    Based on the basic act for disaster countermeasures, this plan aimes at establishing the necessary system concerning the countermeasures for preventing the disaster due to the release of a large quantity of radioactive substances from the Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., determining the measures to be taken for disaster prevention, and striving for the safety of inhabitants by executing the deskworks and services of the disaster prevention related to nuclear power synthetically and purposefully. The general matters concerning the disaster prevention in the district of Shizuoka Prefecture are determined in the ''Plan of disaster prevention in the district of Shizuoka Prefecture (General countermeasures)'', but in view of the peculiarity of nuclear power disaster, the peculiar matters are to be determined in this plan. The general rules on the works of respective disaster prevention organizations, the countermeasures for preventing nuclear power disaster, the emergency countermeasures to nuclear power disaster, the countermeasures to Tokai earthquakes and the countermeasures for restoration after nuclear power disaster are stipulated. (Kako, I.)

  17. Draft 1992 Resource Program : Summary Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future resource needs -- how much new resource development is needed by BPA, which types of resources to acquire and option, how to go about acquiring them, and how much to spend. The Northwest Power Planning Council completed a new Northwest Power Plan in 1991. This Draft Resource Program describes how BPA proposes to do its part to meet the Council's regional resource objectives.

  18. Marginal Generation Technology in the Chinese Power Market towards 2030 Based on Consequential Life Cycle Assessment

    Directory of Open Access Journals (Sweden)

    Guangling Zhao

    2016-09-01

    Full Text Available Electricity consumption is often the hotspot of life cycle assessment (LCA of products, industrial activities, or services. The objective of this paper is to provide a consistent, scientific, region-specific electricity-supply-based inventory of electricity generation technology for national and regional power grids. Marginal electricity generation technology is pivotal in assessing impacts related to additional consumption of electricity. China covers a large geographical area with regional supply grids; these are arguably equally or less integrated. Meanwhile, it is also a country with internal imbalances in regional energy supply and demand. Therefore, we suggest an approach to achieve a geographical subdivision of the Chinese electricity grid, corresponding to the interprovincial regional power grids, namely the North, the Northeast, the East, the Central, the Northwest, and the Southwest China Grids, and the China Southern Power Grid. The approach combines information from the Chinese national plans on for capacity changes in both production and distribution grids, and knowledge of resource availability. The results show that nationally, marginal technology is coal-fired electricity generation, which is the same scenario in the North and Northwest China Grid. In the Northeast, East, and Central China Grid, nuclear power gradually replaces coal-fired electricity and becomes the marginal technology. In the Southwest China Grid and the China Southern Power Grid, the marginal electricity is hydropower towards 2030.

  19. A Vision of China-Arab Interconnection Transmission Network Planning with UHVDC Technology

    Science.gov (United States)

    Wu, Dan; Liu, Yujun; Yin, Hongyuan; Xu, Qingshan; Xu, Xiaohui; Ding, Maosheng

    2017-05-01

    Developments in ultra-high-voltage (UHV) power systems and clean energy technologies are paving the way towards unprecedented energy market globalization. In accordance with the international community’s enthusiasm for building up the Global Energy Internet, this paper focuses on the feasibility of transmitting large-size electricity from northwest China to Arab world through a long-distance transnational power interconnection. The complete investigations on the grids of both the sending-end and receiving-end is firstly presented. Then system configuration of the transmission scheme and corridor route planning is proposed with UHVDC technology. Based on transmission costs’ investigation about similar transmission projects worldwide, the costs of the proposed transmission scheme are estimated through adjustment factors which represent differences in latitude, topography and economy. The proposed China-Arab transmission line sheds light on the prospects of power cooperation and resource sharing between China and Arab states, and appeals for more emphasis on green energy concentrated power interconnections from a global perspective.

  20. PURPA Resource Development in the Pacific Northwest : Case Studies of Ten Electricity Generating Powerplants.

    Energy Technology Data Exchange (ETDEWEB)

    Washington State Energy Office.

    1990-07-01

    The case studies in this document describe the Public Utilities, Regulatory Policies Act (PURPA) development process for a variety of generating technologies. Developer interactions with regulatory agencies and power purchasers are described in some detail. Equipment, installation, and maintenance costs are identified; power marketing considerations are taken into account; and potential environmental impacts, with corresponding mitigation approaches and practices are summarized. The project development case studies were prepared by the energy agencies of the four Northwest states, under contract to the Bonneville Power Administration.

  1. Overview Of Planning Direction Of Nuclear Power Development In Vietnam In The Period Up To 2030

    International Nuclear Information System (INIS)

    Ta Van Huong; Tran Hong Nguyen

    2011-01-01

    Research for peaceful application of nuclear energy, in general, and in particular, for construction of nuclear power plants (NPP) in Vietnam is urgent for social-economic development and for meeting the increasing national electrical demand in future. The expected plan for developing NPPs in Vietnam is defined in the Planning Direction of Nuclear Power Development in Vietnam in the period up to 2030. In according to which, NPPs have been planned in selected sites by the period depends on the detailed conditions of each site, as well as on specification of the national electrical grid. The present report reviews the highlights of this Planning Direction of Nuclear Power Development in Vietnam in the period up to 2030. (author)

  2. Pacific Northwest Laboratory Institutional Plan FY 1995-2000

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    This report serves as a document to describe the role PNL is positioned to take in the Department of Energy`s plans for its national centers in the period 1995-2000. It highlights the strengths of the facilities and personnel present at the laboratory, touches on the accomplishments and projects they have contributed to, and the direction being taken to prepare for the demands to be placed on DOE facilities in the near and far term. It consists of sections titled: director`s statement; laboratory mission and core competencies; laboratory strategic plan; laboratory initiatives; core business areas; critical success factors.

  3. An integrated model for long-term power generation planning toward future smart electricity systems

    International Nuclear Information System (INIS)

    Zhang, Qi; Mclellan, Benjamin C.; Tezuka, Tetsuo; Ishihara, Keiichi N.

    2013-01-01

    Highlights: • An integrated model for planning future smart electricity systems was developed. • The model consists of an optimization model and an hour-by-hour simulation model. • The model was applied to Tokyo area, Japan in light of the Fukushima Accident. • Paths to best generation mixes of smart electricity systems were obtained. • Detailed hourly operation patterns in smart electricity systems were obtained. - Abstract: In the present study, an integrated planning model was developed to find economically/environmentally optimized paths toward future smart electricity systems with high level penetration of intermittent renewable energy and new controllable electric devices at the supply and demand sides respectively for regional scale. The integrated model is used to (i) plan the best power generation and capacity mixes to meet future electricity demand subject to various constraints using an optimization model; (ii) obtain detailed operation patterns of power plants and new controllable electric devices using an hour-by-hour simulation model based on the obtained optimized power generation mix. As a case study, the model was applied to power generation planning in the Tokyo area, Japan, out to 2030 in light of the Fukushima Accident. The paths toward best generation mixes of smart electricity systems in 2030 based on fossil fuel, hydro power, nuclear and renewable energy were obtained and the feasibility of the integrated model was proven

  4. Case study of nuclear power planning

    International Nuclear Information System (INIS)

    Covarrubias, A.J.; Lane, J.A.

    1976-01-01

    An improved version of the computer programme WASP (Wien Automatic System Planning) is described by the example of a case study. The aim of an optimal power plant development within the economic development is reached over several steps the most important parameters of which are explained in detail. To use the method it is necessary to know and to describe the energy and electricity supply situation of the country referred to. The programme development described has proved to be good in use in an international frame. The IAEA offers its help to all prospected customers in their initial period with the programme WASP. (UA) [de

  5. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  6. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  7. Pacific Northwest Salmon Habitat Project Database

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — In the Pacific Northwest Salmon Habitat Project Database Across the Pacific Northwest, both public and private agents are working to improve riverine habitat for a...

  8. Preliminary site characterization at Beishan northwest China-A potential site for China's high-level radioactive waste repository

    International Nuclear Information System (INIS)

    Wang Ju; Su Rui; Xue Weiming; Zheng Hualing

    2004-01-01

    Chinese nuclear power plants,radioactive waste and radioactive waste disposal are introduced. Beishan region (Gansu province,Northwest China)for high-level radioactive waste repository and preliminary site characterization are also introduced. (Zhang chao)

  9. Asotin Creek Model Watershed Plan: Asotin County, Washington, 1995.

    Energy Technology Data Exchange (ETDEWEB)

    Browne, Dave

    1995-04-01

    The Northwest Power Planning Council completed its ``Strategy for Salmon'' in 1992. This is a plan, composed of four specific elements,designed to double the present production of 2.5 million salmon in the Columbia River watershed. These elements have been called the ``four H's'': (1) improve harvest management; (2) improve hatcheries and their production practices; (3) improve survival at hydroelectric dams; and (4) improve and protect fish habitat. The Asotin Creek Model Watershed Plan is the first to be developed in Washington State which is specifically concerned with habitat protection and restoration for salmon and trout. The plan is consistent with the habitat element of the ``Strategy for Salmon''. Asotin Creek is similar in many ways to other salmon-bearing streams in the Snake River system. Its watershed has been significantly impacted by human activities and catastrophic natural events, such as floods and droughts. It supports only remnant salmon and trout populations compared to earlier years. It will require protection and restoration of its fish habitat and riparian corridor in order to increase its salmonid productivity.

  10. Tactical supply chain planning for a forest biomass power plant under supply uncertainty

    International Nuclear Information System (INIS)

    Shabani, Nazanin; Sowlati, Taraneh; Ouhimmou, Mustapha; Rönnqvist, Mikael

    2014-01-01

    Uncertainty in biomass supply is a critical issue that needs to be considered in the production planning of bioenergy plants. Incorporating uncertainty in supply chain planning models provides improved and stable solutions. In this paper, we first reformulate a previously developed non-linear programming model for optimization of a forest biomass power plant supply chain into a linear programming model. The developed model is a multi-period tactical-level production planning problem and considers the supply and storage of forest biomass as well as the production of electricity. It has a one-year planning horizon with monthly time steps. Next, in order to incorporate uncertainty in monthly available biomass into the planning, we develop a two-stage stochastic programming model. Finally, to balance the risk and profit, we propose a bi-objective model. The results show that uncertainty in availability of biomass has an additional cost of $0.4 million for the power plant. Using the proposed stochastic optimization model could reduce this cost by half. - Highlights: • Developed a two-stage stochastic optimization model to consider supply uncertainty. • Maximized the profit of a forest biomass power plant value chain. • Minimized two risk measures, variability index and downside risk, to manage risks. • Stochastic optimization model provided feasible solution for all scenarios. • Results showed a trade-off between profit and risk management

  11. Hybrid power markets in Africa: Generation planning, procurement and contracting challenges

    International Nuclear Information System (INIS)

    Malgas, Isaac; Eberhard, Anton

    2011-01-01

    African power sectors are generally characterised by insufficient generation capacity. Reforms to address poor performances in the 1990s followed a prescribed evolution towards power markets that would allow wholesale competition amongst generators and so lead towards efficiency improvements. Despite reforms being embarked, competitive power markets have not been established in Africa; rather, the result has been the emergence of hybrid markets where state-owned generators and IPPs operate devoid of competition; and although IPPs have emerged in a number of African power sectors, many countries still do not have sufficient generation to meet their electricity demands. This paper investigates the development of private generation power projects in Africa by analysing data collected from both primary and secondary sources in four case studies of power sectors in Ghana, Cote d'Ivoire, Morocco and Tunisia. It identifies how planning and procurement challenges have lead to difficulties in adding sufficient generation capacity in a timely manner, exacerbating the problem of insufficient generation capacity in Africa. It provides suggestions as to how these frameworks could respond more effectively to the capacity challenges faced by hybrid electricity generation markets, and how broader power sector reforms should be guided to reflect the challenges of hybrid markets better. - Research highlights: → The standard model of power sector reform should no longer be used as a progress measure of power sector development in Africa and many other developing countries. → The hybrid market should in itself be recognised as an established 'model' of power sectors in Africa and many developing countries. → Planning, procurement and contracting arrangements should be shaped specifically for hybrid markets in order to address the problem of insufficient generation capacity in developing countries.

  12. The unique role of a public power agency in nuclear communications

    Energy Technology Data Exchange (ETDEWEB)

    Scheele, L.A.; Dobken, J.C., E-mail: lascheele@energy-northwest.com, E-mail: jcdobken@energy-northwest.com [Energy Northwest, Richland, WA (United States)

    2014-07-01

    Public power utilities hold a special responsibility to communicate effectively with the public and to serve as both capacity-building and information resources for public utility district members. Energy Northwest was formed in 1957 as joint state operating agency, and today agency membership includes 27 public power utility districts comprising nearly every public power utility district in Washington state and several municipalities. Energy Northwest owns and operates a diverse portfolio of resources, including a wind project, a hydro project, a solar demonstration project, and the U.S. Pacific Northwest's only nuclear energy facility, the Columbia Generating Station in southeast Washington. Member utilities look to Energy Northwest to provide them with thorough and accurate information on all things nuclear, including the contributions of nuclear energy to the region's energy mix, radiation effects and nuclear accidents. The agency plays a diverse role in relationship building among nuclear entities within the region; providing decision makers with accurate and timely information; developing forums in which member public power utilities become well-versed in talking to their constituents about nuclear issues; and using diverse outlets, including social media, to communicate directly with ratepayers throughout the region. (author)

  13. The unique role of a public power agency in nuclear communications

    International Nuclear Information System (INIS)

    Scheele, L.A.; Dobken, J.C.

    2014-01-01

    Public power utilities hold a special responsibility to communicate effectively with the public and to serve as both capacity-building and information resources for public utility district members. Energy Northwest was formed in 1957 as joint state operating agency, and today agency membership includes 27 public power utility districts comprising nearly every public power utility district in Washington state and several municipalities. Energy Northwest owns and operates a diverse portfolio of resources, including a wind project, a hydro project, a solar demonstration project, and the U.S. Pacific Northwest's only nuclear energy facility, the Columbia Generating Station in southeast Washington. Member utilities look to Energy Northwest to provide them with thorough and accurate information on all things nuclear, including the contributions of nuclear energy to the region's energy mix, radiation effects and nuclear accidents. The agency plays a diverse role in relationship building among nuclear entities within the region; providing decision makers with accurate and timely information; developing forums in which member public power utilities become well-versed in talking to their constituents about nuclear issues; and using diverse outlets, including social media, to communicate directly with ratepayers throughout the region. (author)

  14. Energy for our future : a plan for British Columbia progress to date

    International Nuclear Information System (INIS)

    Ostergaard, P.

    2004-01-01

    This PowerPoint presentation provided a brief overview of British Columbia's electric power system, the policies affecting it, the province's energy plans and support mechanisms to address issues and challenges. In British Columbia, 80 per cent of the electricity is primarily hydro based and is generated by BC Hydro, a public utility. The market structure is regulated and the electricity rates are based on cost of service. The BC market includes western North America with interconnections to Washington State and Alberta. The key issues and challenges facing the electricity sector in the province are meeting domestic demand; adopting clean competitive energy alternatives; export market access and downstream benefits; interest and exchange rates; firming, storage and shaping; transmission upgrades to an aging infrastructure; local governments and First Nations relationships and, permitting and approvals. The transmission system was reviewed with reference to trade with the Pacific Northwest, flexibility and storage. The province's future energy plans are based on low rates and public ownership, secure and reliable supply, more private sector opportunities, and environmental responsibility. figs

  15. Irradiation of Northwest agricultural products

    International Nuclear Information System (INIS)

    Eakin, D.E.; Tingey, G.L.; Anderson, D.B.; Hungate, F.P.

    1985-01-01

    Irradiation of food for disinfestation and preservation is increasing in importance because of increasing resrictions on various chemical treatments. Irradiation treatment is of particular interest in the Northwest because of a growing supply of agricultural products and the need to develop new export markets. Several products have, or could potentially have, significant export markets if stringent insect control procedures are developed and followed. Due to the recognized potential benefits of irradiation, Pacific Northwest Laboratory (PNL) is conducting this program to evaluate the benefits of using irradiation on Northwest agricultural products under the US Department of Energy (DOE) Defense Byproducts Production and Utilization Program. Commodities currently included in the program are cherries, apples, asparagus, spices, hay, and hides

  16. Irradiation of Northwest agricultural products

    International Nuclear Information System (INIS)

    Eakin, D.E.; Tingey, G.L.

    1985-02-01

    Irradiation of food for disinfestation and preservation is increasing in importance because of increasing restrictions on various chemical treatments. Irradiation treatment is of particular interest in the Northwest because of a growing supply of agricultural products and the need to develop new export markets. Several products have, or could potentially have, significant export markets if stringent insect control procedures are developed and followed. Due to the recognized potential benefits of irradiation, Pacific Northwest Laboratory (PNL) is conducting this program to evaluate the benefits of using irradiation on Northwest agricultural products under the US Department of Energy (DOE) Defense Byproducts Production and Utilization Program. Commodities currently included in the program are cherries, apples, asparagus, spices, hay, and hides

  17. The 1992 Pacific Northwest Residential Energy Survey: Phase 1 : Book 1 : Getting Started.

    Energy Technology Data Exchange (ETDEWEB)

    Applied Management & Planning Group (firm); United States. Bonneville Power Administration. End-Use Research Section.

    1993-08-01

    This Executive Summary outlines the general processes employed in and the major findings from the conduct of Phase I of the Pacific Northwest Residential Energy Survey (PNWRES92-I) during the last quarter of 1992. This study was Bonneville`s third comprehensive residential survey of the region, conducted to provide data on energy usage, conservation awareness and behaviors, and associated consumer characteristics for use in forecasting and planning. The summary is divided into four sections: Background sets the stage with respect to the need for the survey, relates it to previous work, outlines the implementation processes, and summarizes the data products. Profiling the respondents summarizes the survey results under these six categories: Demographics; Housing Units; Room Inventory; Appliance Inventory; Air-Conditioning/Heating; Water-Heating; and Opinion. Reports and cross-tabulations describes the various individual documents. Bonneville Power Plus provides a short description of an Excel-spreadsheet-based software program that contains all of the tabulated material in a format that encourages browsing among the tables and charts, with special feature that they can be copied directly into other Windows-based documents.

  18. Kuroshio power plant development plan

    International Nuclear Information System (INIS)

    Chen, Falin

    2010-01-01

    As a country lacking energy reserves, Taiwan imports 99.2% of its energy, with only a small portion of indigenous energy, such as hydro, wind, and solar. In 2008, each Taiwanese spent 85,000 NTD dollars (1 USD ∝ 32 NTD) to purchase oil, coal, gas, and nuclear fuel from foreign countries, accounting for a total payment of 1.8 trillion NTD, more than the annual budget of the Taiwan government of 1.7 trillion NTD. In the same year, Taiwan emitted about 1% of the world's greenhouse gas (GHG), or 12 tons per person-year, ranking 18th globally. These situations in terms of energy security and carbon emission are very severe. To resolve these severe situations, harnessing the power of the Kuroshio in eastern Taiwan offers a great opportunity. The Kuroshio is a branch of the North Pacific Ocean current. Due to the westward-enhanced effect, this ocean current is strong and stable as it passes through eastern Taiwan. The flow rate is about 30 sverdrup (Sv) or 1000 times that of the Yangtze River, the average speed is 1 m/s, the flow direction is fixed to the north, and the flow path is close to the east coast of Taiwan. By precisely locating high-quality sites and implementing sequential works with careful planning, one can possibly generate exploitable power more than 30 GW. With 30 GW of clean energy, Taiwan could effectively enhance energy security, reduce GHG emission, and lower energy-purchasing cost. This paper proposes a feasibility study to explore the power of the Kuroshio. The content consists of four parts: (1) assessment of Kuroshio power reserves, (2) development of turbine generators, (3) development of turbine-anchor system, and (4) deep-sea marine engineering of turbine clusters. By integrating these technologies above, we propose a project to construct a 30 MW pilot plant. In this project, we also discuss the financial analysis and propose new regulations, environmental impact analysis, risk assessment, and other relevant issues. (author)

  19. Planning for Regional Water Resources in Northwest China Using a Dynamic Simulation Model

    Science.gov (United States)

    Chen, C.; Kalra, A.; Ahmad, S.

    2014-12-01

    Problem of water scarcity is prominent in northwest China due to its typical desert climate. Exceedence of sustainable yield of groundwater resources has resulted in groundwater depletion, which has raised a series of issues such as drying wells, increasing pumping costs and environmental damage. With a rapid agricultural and economic development, population increase has added extra stress on available water resources by increasing municipal, agricultural and industrial demands. This necessitates efficient water resources management strategies with better understanding of the causes of water stress and options for sustainable development of economy and management of environment. This study focuses on simulating the water supply and demand, under the influence of changing climate, for Shanshan County, located in northwest of China. A dynamic simulation model is developed using the modeling tool Stella for monthly water balance for the period ranging from 2000-2030. Different future water demand and supply scenarios are developed to represent: (1) base scenario- with current practices; (2) change of the primary water source; (3) improvement of irrigation efficiency; (4) reduction of irrigation area; and (5) reduction of industrial water demand. The results indicate that besides growing demand, the low water use efficiency and low level of water reuse are the primary concerns for water scarcity. Groundwater recharge and abstraction could be balanced by 2030, by reducing industrial demand by 50% and using high efficiency irrigation for agriculture. The model provided a better understanding of the effect of different policies and can help in identifying water resources management strategies.

  20. Discussion of in-service inspection planning for nuclear power plants

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Takagi, Toshiyuki

    2012-01-01

    For creating an inspection plan for industrial plants like nuclear power plants, it is necessary to have a well-grounded basis. Therefore, this paper proposes a method for determining the following three elements of such a plan: the equipment to be inspected, the inspection method to be adopted, and the timing of its implementation using a scientific approach. The key idea is to analyze the components of the plan by employing the understanding of cancer detection and diagnosis in medical science and also to take an approach of creating a plan based on the characteristic features of the component and its aging degradation mode, the performance of the inspection method, and the relationship between the two. Taking all the above into account, the factors to be considered and the best way for inspecting the plants are presented in this paper. (author)

  1. CEGB nuclear power stations basic emergency plan

    International Nuclear Information System (INIS)

    1978-03-01

    The introduction states that this is a typical emergency plan for a nuclear power station employing about 500 people, having two reactors and a total electrical output of 500 Megawatts in an intensively farmed rural area. The document has the following headings: definitions ('site incident', etc); functions of the site emergency organization; conditions for taking emergency action; persons empowered to declare or cancel a site incident or an emergency; emergency actions by staff; control centres; communication; collaboration with other bodies; warnings; transport; house rules; public information centre. (U.K.)

  2. Implementation of an evolutionary algorithm in planning investment in a power distribution system

    Directory of Open Access Journals (Sweden)

    Carlos Andrés García Montoya

    2011-06-01

    Full Text Available The definition of an investment plan to implement in a distribution power system, is a task that constantly faced by utilities. This work presents a methodology for determining the investment plan for a distribution power system under a shortterm, using as a criterion for evaluating investment projects, associated costs and customers benefit from its implementation. Given the number of projects carried out annually on the system, the definition of an investment plan requires the use of computational tools to evaluate, a set of possibilities, the one that best suits the needs of the present system and better results. That is why in the job, implementing a multi objective evolutionary algorithm SPEA (Strength Pareto Evolutionary Algorithm, which, based on the principles of Pareto optimality, it deliver to the planning expert, the best solutions found in the optimization process. The performance of the algorithm is tested using a set of projects to determine the best among the possible plans. We analyze also the effect of operators on the performance of evolutionary algorithm and results.

  3. Report to Congress on status of emergency response planning for nuclear power plants

    International Nuclear Information System (INIS)

    1981-03-01

    This report responds to a request (Public Law 96-295, Section 109) for the Nuclear Regulatory Commission (NRC) to report to Congress on the status of emergency response planning in support of nuclear power reactors. The report includes information on the status of this planning as well as on the Commission actions relating to emergency preparedness. These actions include a summary of the new regulatory requirements and the preliminary results of two comprehensive Evacuation Time Estimate studies; one requested by the NRC including 50 nuclear power plant sites and one conducted by the Federal Emergency Management Agency (FEMA) for 12 high population density sites. FEMA provided the information in this report on the status of State and local planning, including projected schedules for joint State/county/licensee emergency preparedness exercises. Included as Appendicies are the NRC Emergency Planning Final Regulations, 10 CFR Part 50 (45 FR 55402), the FEMA Proposed Rule, 'Review and Approval of State and Local Radiological Emergency Plans and Preparedness', 44 CFR Part 350 (45 FR 42341) and the NRC/FEMA Memorandums of Understanding

  4. Nuclear power plant Severe Accident Research Plan

    International Nuclear Information System (INIS)

    Larkins, J.T.; Cunningham, M.A.

    1983-01-01

    The Severe Accident Research Plan (SARP) will provide technical information necessary to support regulatory decisions in the severe accident area for existing or planned nuclear power plants, and covers research for the time period of January 1982 through January 1986. SARP will develop generic bases to determine how safe the plants are and where and how their level of safety ought to be improved. The analysis to address these issues will be performed using improved probabilistic risk assessment methodology, as benchmarked to more exact data and analysis. There are thirteen program elements in the plan and the work is phased in two parts, with the first phase being completed in early 1984, at which time an assessment will be made whether or not any major changes will be recommended to the Commission for operating plants to handle severe accidents. Additionally at this time, all of the thirteen program elements in Chapter 5 will be reviewed and assessed in terms of how much additional work is necessary and where major impacts in probabilistic risk assessment might be achieved. Confirmatory research will be carried out in phase II to provide additional assurance on the appropriateness of phase I decisions. Most of this work will be concluded by early 1986

  5. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  6. Stochastic Optimization in The Power Management of Bottled Water Production Planning

    Science.gov (United States)

    Antoro, Budi; Nababan, Esther; Mawengkang, Herman

    2018-01-01

    This paper review a model developed to minimize production costs on bottled water production planning through stochastic optimization. As we know, that planning a management means to achieve the goal that have been applied, since each management level in the organization need a planning activities. The built models is a two-stage stochastic models that aims to minimize the cost on production of bottled water by observing that during the production process, neither interfernce nor vice versa occurs. The models were develop to minimaze production cost, assuming the availability of packing raw materials used considered to meet for each kind of bottles. The minimum cost for each kind production of bottled water are expressed in the expectation of each production with a scenario probability. The probability of uncertainly is a representation of the number of productions and the timing of power supply interruption. This is to ensure that the number of interruption that occur does not exceed the limit of the contract agreement that has been made by the company with power suppliers.

  7. Probabilistic tools for planning and operating power systems with distributed energy storage

    DEFF Research Database (Denmark)

    Klöckl, Bernd; Papaefthymiou, George; Pinson, Pierre

    2008-01-01

    Stochastic energy flows are an increasingly important phenomenon in today's power system planning and operation. They are – among other reasons – caused by large amounts of stochastic generation such as wind. The inclusion of energy storage devices, distributed in future systems (distributed energy...... owners are either the grid operators, the generation owners, or the energy traders. For the grid operators being the DES owners, storage operation will have to be integrated into the planning of the system, therefore multivariate nonparametric time series analysis and synthesis methods have to be applied...... to recorded data of stochastic energy resources. Together with suited storage models, the implications of DES on the planning of the system can then be assessed. For the producers or traders being the owners of the DES, the topic to be addressed is the real-time operation of each storage device in the power...

  8. Comparisons of ANSI standards cited in the NRC standard review plan, NUREG-0800 and related documents

    International Nuclear Information System (INIS)

    Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Pawlowski, R.A.; Spiesman, J.B.

    1995-11-01

    This report provides the results of comparisons of the cited and latest versions of ANSI standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC's Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review

  9. Comparisons of ASTM standards cited in the NRC standard review plan, NUREG-0800 and related documents

    International Nuclear Information System (INIS)

    Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Pawlowski, R.A.; Spiesman, J.B.

    1995-10-01

    This report provides the results of comparisons of the cited and latest versions of ASTM standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC's Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review

  10. Albeni Falls Wildlife Management Plan - preliminary environmental assessment

    International Nuclear Information System (INIS)

    1996-04-01

    Bonneville Power Administration (BPA) proposes to fund the development and implementation of the Albeni Falls Wildlife Management Plan. Approved by the Northwest Power Planning Council (Council) in 1990, the project is a cooperative effort with the Interagency Work Group that includes the Idaho Department of Fish and Game (IDFG); United States Fish and Wildlife Service (USFWS); United States Forest Service (USFS); United States Army Corps of Engineers (COE); the Kalispel Tribe; and the Upper Columbia United Tribes (UCUT). The proposed action would enable the Interagency Work Group to protect and enhance a variety of wetland and riparian habitats, restore 28,587 habitat units lost as a result of the construction and operation of Albeni Falls Dam, and implement long-term wildlife management activities at selected sites within the overall study area. This Environmental Assessment (EA) examines the potential environmental effects of protecting and enhancing wildlife habitat in selected portions of a 225,077 hectare (556,160 acre) study area surrounding Lake Pend Oreille in Bonner County, and 7,770 hectare (19,200 acre) area surrounding Spirit and Twin lakes, in Kootenai County, Idaho. Four proposed activities are analyzed: habitat protection; habitat enhancement; operation and maintenance (O ampersand M); and monitoring and evaluation (M ampersand E)

  11. National nuclear power plant safety research 2011-2014. SAFIR2014 framework plan

    International Nuclear Information System (INIS)

    2010-01-01

    A country utilising nuclear energy is presumed to possess a sufficient infrastructure to cover the education and research in this field, besides the operating organisations of the plants and a regulatory body. The starting point of public nuclear safety research programmes is that they provide the necessary conditions for retaining the knowledge needed for ensuring the continuance of safe and economic use of nuclear power, for development of new know-how and for participation in international cooperation. In fact, the Finnish organisations engaged in research in this sector have been an important resource which the various ministries, the Radiation and Nuclear Safety Authority (STUK) and the power companies have had at their disposal. Ministry of employment and the economy appointed a group to write the Framework Plan of the new programme. This report contains a proposal for the general outline of the programme, entitled as SAFIR2014 (SAfety of Nuclear Power Plants - Finnish National Research Programme). The plan has been made for the period 2011-2014, but it is based on safety challenges identified for a longer time span as well. Olkiluoto 3, the new nuclear power plant unit under construction and new decisions-in-principle have also been taken into account in the plan. The safety challenges set by the existing plants and the new projects, as well as the ensuing research needs do, however, converge to a great extent. The research programme is strongly based on the Chapter 7a of the Finnish Nuclear Energy Act. The construction of new power plant units will increase the need for experts in the field in Finland. At the same time, the retirement of the existing experts is continuing. These factors together will call for more education and training, in which active research activities play a key role. This situation also makes long-term safety research face a great challenge. The Framework Plan aims to define the important research needs related to the safety

  12. Analysis and Development of a Project Evaluation Process.

    Energy Technology Data Exchange (ETDEWEB)

    Coutant, Charles C.; Cada Glenn F.

    1985-01-01

    The Bonneville Power Administration has responsibility, assigned by the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (Public Law 96-501; 16 USC 839), for implementing the Columbia River Basin Fish and Wildlife Program of the Northwest Power Planning Council. One aspect of this responsibility is evaluation of project proposals and ongoing and completed projects. This report recommends formalized procedures for conducting this work in an accurate, professional, and widely respected manner. Recommendations and justifications are based largely on interviews with federal and state agencies and Indian tribes in the Northwest and nationally. Organizations were selected that have evaluation systems of their own, interact with the Fish and Wildlife Program, or have similar objectives or obligations. Perspective on aspects to be considered were obtained from the social science of evaluation planning. Examples of procedures and quantitative criteria are proposed. 1 figure, 2 tables.

  13. Pacific Northwest regional assessment program

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The Pacific Northwest (comprised of the states of Alaska, Idaho, Montana, Oregon, Washington and Wyoming) can by several measures be regarded as a national warehouse of fossil energy resources. This condition coupled with an evolving national policy stressing utilization of fossil fuels in the near term prior to development of more advanced technologies for energy supply, could result in the imposition of major changes in the region's environmental, socioeconomic and possibly health status. The objective of the Pacific Northwest Regional Assessment Program is to establish and exercise an integrated analytical assessment program for evaluation of these potential changes that may result from various energy development or conservation scenarios. After consideration of a variety of approaches to integrated assessment at a regional level, Pacific Northwest Laboratories (PNL) has concluded that dynamic simulation techniques provide the best available approach to evaluating the issues pertinent to the Northwest. As a result, the PNW Regional Assessment Program has been structured in a framework involving ten sectors. Each of these sectors involve their own submodels that receive information either from outside the model as exogenous inputs or from other sector submodels

  14. Nuclear power plant thermal-hydraulic performance research program plan

    International Nuclear Information System (INIS)

    1988-07-01

    The purpose of this program plan is to present a more detailed description of the thermal-hydraulic research program than that provided in the NRC Five-Year Plan so that the research plan and objectives can be better understood and evaluated by the offices concerned. The plan is prepared by the Office of Nuclear Regulatory Research (RES) with input from the Office of Nuclear Reactor Regulation (NRR) and updated periodically. The plan covers the research sponsored by the Reactor and Plant Systems Branch and defines the major issues (related to thermal-hydraulic behavior in nuclear power plants) the NRC is seeking to resolve and provides plans for their resolution; relates the proposed research to these issues; defines the products needed to resolve these issues; provides a context that shows both the historical perspective and the relationship of individual projects to the overall objectives; and defines major interfaces with other disciplines (e.g., structural, risk, human factors, accident management, severe accident) needed for total resolution of some issues. This plan addresses the types of thermal-hydraulic transients that are normally considered in the regulatory process of licensing the current generation of light water reactors. This process is influenced by the regulatory requirements imposed by NRC and the consequent need for technical information that is supplied by RES through its contractors. Thus, most contractor programmatic work is administered by RES. Regulatory requirements involve the normal review of industry analyses of design basis accidents, as well as the understanding of abnormal occurrences in operating reactors. Since such transients often involve complex thermal-hydraulic interactions, a well-planned thermal-hydraulic research plan is needed

  15. 76 FR 30147 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-05-24

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project AGENCY: Western Area Power.... SUMMARY: The Western Area Power Administration (Western), a Federal power marketing agency of the..., the Energy Management and Planning Program (Program), and the Conformed General Consolidated Power...

  16. An optimization framework for the integrated planning of generation and transmission expansion in interconnected power systems

    International Nuclear Information System (INIS)

    Guerra, Omar J.; Tejada, Diego A.; Reklaitis, Gintaras V.

    2016-01-01

    Highlights: • A novel optimization framework for the design and planning of interconnected power systems is proposed. • The framework integrates generation and transmission capacity expansion planning. • Reserve and emission constraints are included. • Business as usual and CO_2 mitigation policy scenarios are evaluated. • Reconfiguration of existing power generation technologies is the most cost-effective option for CO_2 emissions mitigation. - Abstract: Energy, and particularly electricity, has played and will continue to play a very important role in the development of human society. Electricity, which is the most flexible and manageable energy form, is currently used in a variety of activities and applications. For instance, electricity is used for heating, cooling, lighting, and for operating electronic appliances and electric vehicles. Nowadays, given the rapid development and commercialization of technologies and devices that rely on electricity, electricity demand is increasing faster than overall primary energy supply. Consequently, the design and planning of power systems is becoming a progressively more important issue in order to provide affordable, reliable and sustainable energy in timely fashion, not only in developed countries but particularly in developing economies where electricity demand is increasing even faster. Power systems are networks of electrical devices, such as power plants, transformers, and transmission lines, used to produce, transmit, and supply electricity. The design and planning of such systems require the selection of generation technologies, along with the capacity, location, and timing of generation and transmission capacity expansions to meet electricity demand over a long-term horizon. This manuscript presents a comprehensive optimization framework for the design and planning of interconnected power systems, including the integration of generation and transmission capacity expansion planning. The proposed

  17. Acceptance criteria for the evaluation of nuclear power reactor security plans

    International Nuclear Information System (INIS)

    1982-08-01

    This guidance document contains acceptance criteria to be used in the NRC license review process. It contains specific criteria for use in evaluating the acceptability of nuclear power reactor security programs as detailed in security plans

  18. 76 FR 23583 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-04-27

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project AGENCY: Western Area Power... Area Power Administration (Western), a Federal power marketing agency of the Department of Energy (DOE), will apply the Energy Planning and Management Program (Program) Power Marketing Initiative (PMI), as...

  19. Bonneville Power Administration 1997 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-01-01

    The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

  20. Preparing Canada's power systems for transition to the year 2000: the Y2K programs of Canada's electric utility companies: province-by-province report

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1999-09-01

    The province-by-province report covers BC Hydro; TransAlta, ATCO Ltd., EPCOR, and Enmax, SaskPower, Manitoba Hydro, Winnipeg Hydro, Ontario Power Generation, Ontario Hydro Services Company, Toronto Hydro, Hydro-Quebec and Energie Maclaren, Newfoundland and Labrador Hydro, Newfoundland Power, Nova Scotia Power, Maritime Electric,Yukon and Northwest Territories,Yukon Electrical Company Ltd., Northland Utilities (Yellowknife) Ltd. and Northland Utilities (NWT) Ltd. A report typically deals with inventory, testing and remediation of business systems, inventory, testing and remediation of operational control devices, business partner reviews, and preparation and exercising of contingency plans, as well as Y2K status and readiness reports, and dateline preparations.

  1. Simulation-based power calculations for planning a two-stage individual participant data meta-analysis.

    Science.gov (United States)

    Ensor, Joie; Burke, Danielle L; Snell, Kym I E; Hemming, Karla; Riley, Richard D

    2018-05-18

    Researchers and funders should consider the statistical power of planned Individual Participant Data (IPD) meta-analysis projects, as they are often time-consuming and costly. We propose simulation-based power calculations utilising a two-stage framework, and illustrate the approach for a planned IPD meta-analysis of randomised trials with continuous outcomes where the aim is to identify treatment-covariate interactions. The simulation approach has four steps: (i) specify an underlying (data generating) statistical model for trials in the IPD meta-analysis; (ii) use readily available information (e.g. from publications) and prior knowledge (e.g. number of studies promising IPD) to specify model parameter values (e.g. control group mean, intervention effect, treatment-covariate interaction); (iii) simulate an IPD meta-analysis dataset of a particular size from the model, and apply a two-stage IPD meta-analysis to obtain the summary estimate of interest (e.g. interaction effect) and its associated p-value; (iv) repeat the previous step (e.g. thousands of times), then estimate the power to detect a genuine effect by the proportion of summary estimates with a significant p-value. In a planned IPD meta-analysis of lifestyle interventions to reduce weight gain in pregnancy, 14 trials (1183 patients) promised their IPD to examine a treatment-BMI interaction (i.e. whether baseline BMI modifies intervention effect on weight gain). Using our simulation-based approach, a two-stage IPD meta-analysis has meta-analysis was appropriate. Pre-specified adjustment for prognostic factors would increase power further. Incorrect dichotomisation of BMI would reduce power by over 20%, similar to immediately throwing away IPD from ten trials. Simulation-based power calculations could inform the planning and funding of IPD projects, and should be used routinely.

  2. 76 FR 35884 - Gas Transmission Northwest LLC; Notice of Intent To Prepare an Environmental Assessment for the...

    Science.gov (United States)

    2011-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11-5-000] Gas Transmission Northwest LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Carty Lateral Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission ...

  3. 7 CFR 319.8-13 - From Northwest Mexico.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false From Northwest Mexico. 319.8-13 Section 319.8-13... for the Entry of Cotton and Covers from Mexico § 319.8-13 From Northwest Mexico. Contingent upon continued freedom of Northwest Mexico and of the West Coast of Mexico from infestations of the pink bollworm...

  4. A Power Planning Algorithm Based on RPL for AMI Wireless Sensor Networks.

    Science.gov (United States)

    Miguel, Marcio L F; Jamhour, Edgard; Pellenz, Marcelo E; Penna, Manoel C

    2017-03-25

    The advanced metering infrastructure (AMI) is an architecture for two-way communication between electric, gas and water meters and city utilities. The AMI network is a wireless sensor network that provides communication for metering devices in the neighborhood area of the smart grid. Recently, the applicability of a routing protocol for low-power and lossy networks (RPL) has been considered in AMI networks. Some studies in the literature have pointed out problems with RPL, including sub-optimal path selection and instability. In this paper, we defend the viewpoint that careful planning of the transmission power in wireless RPL networks can significantly reduce the pointed problems. This paper presents a method for planning the transmission power in order to assure that, after convergence, the size of the parent set of the RPL nodes is as close as possible to a predefined size. Another important feature is that all nodes in the parent set offer connectivity through links of similar quality.

  5. 77 FR 12086 - Final Staff Guidance, Revision 4 to Standard Review Plan; Section 8.1 on Electric Power-Introduction

    Science.gov (United States)

    2012-02-28

    ... Plan; Section 8.1 on Electric Power--Introduction AGENCY: Nuclear Regulatory Commission. [[Page 12087... Nuclear Power Plants,'' Standard Review Plan (SRP) Section 8.1 on ``Electric Power--Introduction,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML113640121), and the Branch...

  6. Evaluation of wind power planning in Denmark – Towards an integrated perspective

    DEFF Research Database (Denmark)

    Sperling, Karl; Hvelplund, Frede; Mathiesen, Brian Vad

    2010-01-01

    Wind power is a maturing technology that may form an essential element of fully renewable energy systems in a number of countries. Denmark has a long history of wind power development and is planning to expand its existing capacity. If large-scale penetration of wind power is to be achieved......, an integrated framework is needed that can respond to the associated challenges. This paper argues for adopting an integrated macro perspective when evaluating and building frameworks to support wind power development. This macro perspective is applied to the case of Denmark, and more specifically to concrete...

  7. 75 FR 4102 - Folsom Lake State Recreation Area and Folsom Power House State Historic Park General Plan...

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Folsom Lake State Recreation Area and Folsom Power House State Historic Park General Plan/Resource Management Plan AGENCY: Bureau of Reclamation... review and comment a joint Final EIS/EIR for the Folsom Lake State Recreation Area and Folsom Power House...

  8. Point Climat no. 21 'Regional wind power plans: is there enough wind to reach the Grenelle wind power targets?'

    International Nuclear Information System (INIS)

    Bordier, Cecile; Charentenay, Jeremie de

    2012-01-01

    Among the publications of CDC Climat Research, 'Climate Briefs' presents, in a few pages, hot topics in climate change policy. This issue addresses the following points: Regional wind power plans assess the wind power development potential of every French region. The aggregate regional potential largely exceeds national targets for 2020. However, achieving these targets is still far from guaranteed: the forecasted potential is theoretical, and the issues involved in implementing wind power projects on the ground will likely reduce this potential

  9. Reliability program plan for the Kilowatt Isotope Power System (KIPS) technology verification phase

    International Nuclear Information System (INIS)

    1978-01-01

    Ths document is an integral part of the Kilowatt Isotope Power System (KIPS) Program Plan. This document defines the KIPS Reliability Program Plan for the Technology Verification Phase. This document delineates the reliability assurance tasks that are to be accomplished by Sundstrand and its suppliers during the design, fabrication and testing of the KIPS

  10. Dynamic Isotope Power System: technology verification phase, program plan, 1 October 1978

    International Nuclear Information System (INIS)

    1979-01-01

    The technology verification phase program plan of the Dynamic Isotope Power System (DIPS) project is presented. DIPS is a project to develop a 0.5 to 2.0 kW power system for spacecraft using an isotope heat source and a closed-cycle Rankine power-system with an organic working fluid. The technology verification phase's purposes are to increase the system efficiency to over 18%, to demonstrate system reliability, and to provide an estimate for flight test scheduling. Progress toward these goals is reported

  11. Salmonella Bacteremia Among Children in Central and Northwest Nigeria, 2008–2015

    Science.gov (United States)

    Obaro, Stephen K.; Hassan-Hanga, Fatimah; Olateju, Eyinade K.; Umoru, Dominic; Lawson, Lovett; Olanipekun, Grace; Ibrahim, Sadeeq; Munir, Huda; Ihesiolor, Gabriel; Maduekwe, Augustine; Ohiaeri, Chinatu; Adetola, Anthony; Shetima, Denis; Jibir, Binta W.; Nakaura, Hafsat; Kocmich, Nicholas; Ajose, Therasa; Idiong, David; Masokano, Kabir; Ifabiyi, Adeyemi; Ihebuzor, Nnenna; Chen, Baojiang; Meza, Jane; Akindele, Adebayo; Rezac-Elgohary, Amy; Olaosebikan, Rasaq; Suwaid, Salman; Gambo, Mahmoud; Alter, Roxanne; Davies, Herbert D.; Fey, Paul D.

    2015-01-01

    Background. Etiologic agents of childhood bacteremia remain poorly defined in Nigeria. The absence of such data promotes indiscriminate use of antibiotics and delays implementation of appropriate preventive strategies. Methods. We established diagnostic laboratories for bacteremia surveillance at regional sites in central and northwest Nigeria. Acutely ill children aged <5 years with clinically suspected bacteremia were evaluated at rural and urban clinical facilities in the Federal Capital Territory, central region and in Kano, northwest Nigeria. Blood was cultured using the automated Bactec incubator system. Results. Between September 2008 and April 2015, we screened 10 133 children. Clinically significant bacteremia was detected in 609 of 4051 (15%) in the northwest and 457 of 6082 (7.5%) in the central region. Across both regions, Salmonella species account for 24%–59.8% of bacteremias and are the commonest cause of childhood bacteremia, with a predominance of Salmonella enterica serovar Typhi. The prevalence of resistance to ampicillin, chloramphenicol, and cotrimoxazole was 38.11%, with regional differences in susceptibility to different antibiotics but high prevalence of resistance to readily available oral antibiotics. Conclusions. Salmonella Typhi is the leading cause of childhood bacteremia in central Nigeria. Expanded surveillance is planned to define the dynamics of transmission. The high prevalence of multidrug-resistant strains calls for improvement in environmental sanitation in the long term and vaccination in the short term. PMID:26449948

  12. Factor analysis for imperfect maintenance planning at nuclear power plants by cognitive task analysis

    International Nuclear Information System (INIS)

    Takagawa, Kenichi; Iida, Hiroyasu

    2011-01-01

    Imperfect maintenance planning was frequently identified in domestic nuclear power plants. To prevent such an event, we analyzed causal factors in maintenance planning stages and showed the directionality of countermeasures in this study. There is a pragmatic limit in finding the causal factors from the items based on report descriptions. Therefore, the idea of the systemic accident model, which is used to monitor the performance variability in normal circumstances, is taken as a new concept instead of investigating negative factors. As an actual method for analyzing usual activities, cognitive task analysis (CTA) was applied. Persons who experienced various maintenance activities at one electric power company were interviewed about sources related to decision making during maintenance planning, and then usual factors affecting planning were extracted as performance variability factors. The tendency of domestic events was analyzed using the classification item of those factors, and the directionality of countermeasures was shown. The following are critical for preventing imperfect maintenance planning: the persons in charge should fully understand the situation of the equipment for which they are responsible in the work planning and maintenance evaluation stages, and they should definitely understand, for example, the maintenance bases of that equipment. (author)

  13. On the question of a site plan approval procedure for large-scale power stations

    International Nuclear Information System (INIS)

    Roemermann, K.

    1982-01-01

    The author discusses the question whether a plan approval procedure for large-sclae power plants might contribute to shortening the period of time currently used for the licensing of such plants. On the basis of current practice which includes a planning and building permission by virtue of section 35 of the building law (BBauG) together with an approval of plans within the framework of regional planning, the author explains and discusses various models of site plan approval procedures, (a.o. section 38 of the Federal building law). (HP) [de

  14. It's Indisputable: Five Facts About Planning and Operating Modern Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Bloom, Aaron; Helman, Udi; Holttinen, Hannele; Summers, Kate; Bakke, Jordan; Brinkman, Gregory; Lopez, Anthony

    2017-11-01

    An indisputable fact cannot be rebutted. It is supported by theory and experience. Over the past 25 years, wind and solar generation has undergone dramatic growth, resulting in a variety of experiences that model the integration of wind and solar into the planning and operation of modern electric power systems. In this article, we bring together examples from Europe, North America, and Australia to identify five indisputable facts about planning and operating modern power systems. Taken together, we hope these experiences can help build consensus among the engineering and public policy communities about the current state of wind and solar integration and also facilitate conversations about evolving future challenges.

  15. Energy and nuclear power planning study for Thailand

    International Nuclear Information System (INIS)

    1989-08-01

    The present report describes the study conducted in co-operation with several agencies and organizations from Thailand and covers the energy and electricity requirements and the optimal expansion plans for the power generating system for this country up to year 2011. It is emphasized that the study was carried out by a team of experts from the Electricity Generating Authority of Thailand (EGAT), the National Economic and Social Development Board (NESDB), the National Energy Administration (NEA) and the Office of Atomic Energy for Peace (OAEP), who were fully responsible for all phases of the study, including the production of the present report. The IAEA's responsibility was to provide overall co-ordination and general guidance during the conduct of the study, as well as training and assistance in the implementation and use of the IAEA's computerized planning methodologies on the computer facilities of Thailand. Refs, figs and tabs

  16. Evaluation of the effectiveness of the implementation of power plans in Kenya

    Energy Technology Data Exchange (ETDEWEB)

    Ruwah, N.; Chang, C., E-mail: ndumzilla@email.kings.ac.kr, E-mail: ckchang@kings.ac.kr [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-07-01

    The purpose of this research is to make an in depth analysis on why developing countries do not seem to move forward towards electric energy security as projected in their energy plans. It is evident that electric energy plan in developing countries do not work very well. Is it because of poor planning or is it due to poor implementation? This research was done with Kenya as the case study. The primary data collection method was interviews of electric energy planners in Kenya. Least cost power development plans and electric energy plans were assessed and compared to what has been actually implemented, according to the plans. After the problem analysis, this research aims at finding possible solutions to the problems. The solutions to be proposed shall be aimed at advising the developing countries' governments, the electric energy planners and policy makers and the relevant stakeholders on the best planning and implementation strategies. (author)

  17. Evaluation of the effectiveness of the implementation of power plans in Kenya

    International Nuclear Information System (INIS)

    Ruwah, N.; Chang, C.

    2014-01-01

    The purpose of this research is to make an in depth analysis on why developing countries do not seem to move forward towards electric energy security as projected in their energy plans. It is evident that electric energy plan in developing countries do not work very well. Is it because of poor planning or is it due to poor implementation? This research was done with Kenya as the case study. The primary data collection method was interviews of electric energy planners in Kenya. Least cost power development plans and electric energy plans were assessed and compared to what has been actually implemented, according to the plans. After the problem analysis, this research aims at finding possible solutions to the problems. The solutions to be proposed shall be aimed at advising the developing countries' governments, the electric energy planners and policy makers and the relevant stakeholders on the best planning and implementation strategies. (author)

  18. Mixed waste management in Washington and the Northwest Compact Region

    International Nuclear Information System (INIS)

    Carlin, E.M.

    1988-01-01

    The state of Washington's concerns about the management of mixed waste have evolved over the past year. One concern that receives increasing attention is the Northwest Compact Region's need to plan for disposal of its own mixed waste. An informal survey of the region's potential mixed waste generators has indicated that mixed waste volumes are low. However, the opening of a disposal facility may result in increased waste volumes. A preliminary proposal for such a facility has been reviewed by the federal and state agencies that dually regulate mixed waste. Initial conclusions reached by the regulators are presented

  19. Tree-ring reconstruction of streamflow in the Snare River Basin, Northwest Territories, Canada

    Science.gov (United States)

    Martin, J. P.; Pisaric, M. F.

    2017-12-01

    Drought is a component of many ecosystems in North America causing environmental and socioeconomical impacts. In the ongoing context of climatic and environmental changes, drought-related issues are becoming problematic in northern Canada, which have not been associated with drought-like conditions in the past. Dryer than average conditions threatens the energy security of northern canadian communities, since this region relies on the production of hydroelectricity as an energy source. In the North Slave Region of Northwest Territory (NWT), water levels and streamflows were significantly lower in 2014/2015. The Government of the NWT had to spend nearly $50 million to purchase diesel fuel to generate enough electricity to supplement the reduced power generation of the Snare River hydroelectric system, hence the need to better understand the multi-decadal variability in streamflow. The aims of this presentation are i) to present jack pine and white spruce tree-ring chronologies of Southern NWT; ii) to reconstruct past streamflow of the Snare River Basin; iii) to evaluate the frequency and magnitude of extreme drought conditions, and iv) to identify which large-scale atmospheric or oceanic patterns are teleconnected to regional hydraulic conditions. Preliminary results show that the growth of jack pine and white spruce populations is better correlated with precipitation and temperature, respectively, than hydraulic conditions. Nonetheless, we present a robust streamflow reconstruction of the Snare River that is well correlated with the summer North Atlantic Oscillation (NAO) index, albeit the strength of the correlation is non-stationary. Spectral analysis corroborate the synchronicity between negative NAO conditions and drought conditions. From an operational standpoint, considering that the general occurrence of positive/negative NAO can be predicted, it the hope of the authors that these results can facilitate energetic planning in the Northwest Territories through

  20. Hydropower planning coordinated with wind power in areas with congestion problems for trading on the spot and the regulating market

    International Nuclear Information System (INIS)

    Matevosyan, Julija; Olsson, Magnus; Soeder, Lennart

    2009-01-01

    In this paper a day-ahead planning algorithm for a multi-reservoir hydropower system coordinated with wind power is developed. Coordination applies to real situations, where wind power and hydropower are owned by different utilities, sharing the same transmission lines, though hydropower has priority for transmission capacity. Coordination is thus necessary to minimize wind energy curtailments during congestion situations. The planning algorithm accounts for the uncertainty of wind power forecasts and power market price uncertainty. Planning for the spot market and the regulating market is considered in the algorithm. The planning algorithm is applied to a case study and the results are summarized in the paper. (author)

  1. Risk management in power generation and trading planning with financial instruments; Risikomanagement fuer Stromerzeugungs- und Handelsunternehmen mit Finanzinstrumenten

    Energy Technology Data Exchange (ETDEWEB)

    Blaesig, B.; Huebner, M.; Hinueber, G.; Haubrich, H.J. [Technische Hochschule Aachen (Germany). Lehrstuhl und Inst. fuer Elektrische Anlagen und Energiewirtschaft

    2006-04-15

    Volatile prices in the electric power trade and varying customers' acceptance increasingly set the companies under competitive pressure and cause planning uncertainties on the producer side. In order to justice to the changed requirements in the energy economy, new methods for a systematic risk management must be developed within planning. On the basis of power generation planning and a commercial planning the authors of the contribution under consideration report on the development of a risk management with financial instruments.

  2. Spring Chinook Supplementation Monitoring; Yakima Fisheries Project Management Plan, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A. (Washington Department of Fish and Wildlife, Olympia, WA); Watson, Bruce; Johnston, Mark (Confederated Tribes and Bands of the Yakama Nation, Fisheries Resource Management, Toppenish, WA)

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Despite the importance of monitoring to the project, monitoring planning has been slow to develop. The only general written statement of monitoring planning for the project is Chapter 9 of the current Project Status Report (PSR), written in 1993. That document is a reasonably good overview, and presents some important basic principles of monitoring, but is decidedly lacking in specifics. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document.

  3. Improving acceptance in wind power planning

    International Nuclear Information System (INIS)

    Hammarlund, K.

    1996-01-01

    This paper presents important factors and planning procedures for public acceptance of wind power. Opinion surveys in Sweden show that acceptance is connected to the concept of utility rather than the aesthetic values. If wind turbines are confined by the authorities to marginal areas they will not earn their rightful place in the landscape by being of use. A positive attitude in general promotes positive experience of the effects of wind turbines. It is therefore essential to establish a sense of cooperation between the project management and the public. An open dialogue and continuous information will increase the possibilities for acceptance of future development. We must establish new codes of practice in permit processing because policies today contains idealogical and practical contradictions between the development and preservation of landscapes. (author)

  4. Improving acceptance in wind power planning

    Energy Technology Data Exchange (ETDEWEB)

    Hammarlund, K. [Lund Univ. (Sweden). Dept. of Social and Economic Geography

    1996-12-01

    This paper presents important factors and planning procedures for public acceptance of wind power. Opinion surveys in Sweden show that acceptance is connected to the concept of utility rather than the aesthetic values. If wind turbines are confined by the authorities to marginal areas, they will not earn their rightful place in the landscape by being of use. A positive attitude in general promotes a positive experience of the effects of wind turbines. It is therefore essential to establish a sense of cooperation between the project management and the public. An open dialogue and continuous information will increase the possibilities for acceptance of future development. We must establish new codes of practice in permit processing because policies today contains ideological and practical contradictions between development and preservation of landscapes. 16 refs, 2 tabs

  5. An Assessment Model for Energy Efficiency Program Planning in Electric Utilities: Case of the Pacific of Northwest U.S.A

    Science.gov (United States)

    Iskin, Ibrahim

    Energy efficiency stands out with its potential to address a number of challenges that today's electric utilities face, including increasing and changing electricity demand, shrinking operating capacity, and decreasing system reliability and flexibility. Being the least cost and least risky alternative, the share of energy efficiency programs in utilities' energy portfolios has been on the rise since the 1980s, and their increasing importance is expected to continue in the future. Despite holding great promise, the ability to determine and invest in only the most promising program alternatives plays a key role in the successful use of energy efficiency as a utility-wide resource. This issue becomes even more significant considering the availability of a vast number of potential energy efficiency programs, the rapidly changing business environment, and the existence of multiple stakeholders. This dissertation introduces hierarchical decision modeling as the framework for energy efficiency program planning in electric utilities. The model focuses on the assessment of emerging energy efficiency programs and proposes to bridge the gap between technology screening and cost/benefit evaluation practices. This approach is expected to identify emerging technology alternatives which have the highest potential to pass cost/benefit ratio testing procedures and contribute to the effectiveness of decision practices in energy efficiency program planning. The model also incorporates rank order analysis and sensitivity analysis for testing the robustness of results from different stakeholder perspectives and future uncertainties in an attempt to enable more informed decision-making practices. The model was applied to the case of 13 high priority emerging energy efficiency program alternatives identified in the Pacific Northwest, U.S.A. The results of this study reveal that energy savings potential is the most important program management consideration in selecting emerging energy

  6. Gas allocation plans based on failures scenarios: PETROBRAS-Gas and Power Sector

    Energy Technology Data Exchange (ETDEWEB)

    Faertes, Denise; Vieira, Flavia; Saker, Leonardo; Heil, Luciana [PETROBRAS, Rio de Janeiro, RJ (Brazil); Galvao, Joao [DNV, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The purpose of this paper is to present gas allocation plans developed for PETROBRAS Gas and Power Sector, considering failure to supply scenarios that could occur along gas supply network. Those scenarios, as well as the associated contingency plans, were identified and validated by an experienced team, composed by engineers and operators from different PETROBRAS sectors. The key issue of concern was the anticipation of possible undesired scenarios that could imply on contract shortfalls, the evaluation of possible maneuvers, taking into account best gas delivery allocation. Different software were used for the simulation of best gas supply allocation and for the verification of delivery pressure and conditions for final consumers. The ability of being capable of dealing with undesired or crisis scenarios, based on suitable anticipation levels, is, nowadays, a highly valuable attribute to be presented by competitive corporations, for best crisis management and prompt recovery response. Those plans are being used by Gas and Power Gas Operation Control Centre and as an input for reliability modeling of gas supply chain. (author)

  7. An investigation on the impacts of regulatory interventions on wind power expansion in generation planning

    International Nuclear Information System (INIS)

    Alishahi, Ehsan; Moghaddam, Mohsen P.; Sheikh-El-Eslami, Mohammad K.

    2011-01-01

    Large integration of intermittent wind generation in power system has necessitated the inclusion of more innovative and sophisticated approaches in power system investment planning. This paper presents a novel framework on the basis of a combination of stochastic dynamic programming (SDP) algorithm and game theory to study the impacts of different regulatory interventions to promote wind power investment in generation expansion planning. In this study, regulatory policies include Feed-in-Tariff (FIT) incentive, quota and tradable green certificate. The intermittent nature and uncertainties of wind power generation will cause the investors encounter risk in their investment decisions. To overcome this problem, a novel model has been derived to study the regulatory impacts on wind generation expansion planning. In our approach, the probabilistic nature of wind generation is modeled. The model can calculate optimal investment strategies, in which the wind power uncertainty is included. This framework is implemented on a test system to illustrate the working of the proposed approach. The result shows that FITs are the most effective policy to encourage the rapid and sustained deployment of wind power. FITs can significantly reduce the risks of investing in renewable energy technologies and thus create conditions conducive to rapid market growth. - Highlights: → The impacts of regulatory policies to promote wind power investment are investigated. → These policies include Feed-in-Tariff (FIT), quota and tradable green certificate. → Result shows that FIT is an effective policy to motivate the rapid growth of wind power. → In quota, customers are forced to provide the quota decided by regulators from wind.

  8. Interesting tools for the cybersecurity plan of a nuclear power plant; Herramientas de utilidad para el plan de Ciberseguridad de una Planta Nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Pareja, I.; Carrasco, J. A.; Cerro, F. J. del

    2012-07-01

    The use of digital technologies in monitoring and control systems of nuclear power plants and their connectivity requirements, originate cybersecurity difficulties that should be addressed in a cybersecurity plan. This plan should guide the policies and procedures followed during the design maintenance and operation of the systems inside a nuclear power plant. It also should refer to adequate tools able to reach the established cybersecurity requirements. The combination of Datadiodes and tools for publishing video (like tVGA2web), permit an isolation and remote maintenance in a 100% safety way and their use should be disseminated. In the paper other type of tools useful for nuclear power plants are also mentioned.

  9. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GiS) mbH, Weinheim (Germany)

    2014-05-15

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  10. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  11. Salmon recovery planning using the VELMA model

    Science.gov (United States)

    We developed a set of tools to provide decision support for community-based salmon recovery planning in Pacific Northwest watersheds. This seminar describes how these tools are being integrated and applied in collaboration with Puget Sound tribes and community stakeholders to add...

  12. Review and evaluation of TDI diesel generator owner's group program plan

    International Nuclear Information System (INIS)

    1984-06-01

    This report documents a review, performed by the Pacific Northwest Laboratory (PNL), of the Transamerica Delaval, Inc. (TDI) Diesel Generator Owner's Group Program Plan. This report was prepared as part of the technical support PNL is providing to the US Nuclear Regulatory Commission (NRC), Division of Licensing, on matters pertaining to the reliability of TDI diesel generators as emergency power sources for safety-related nuclear systems. The report presents the comments and conclusions reached by PNL, with the advice and counsel of five diesel engine consultants, on the principal elements of the Owners' Group Plan: Generic Problem Resolution, Design Review/Quality Revalidation, and Engine Testing and Inspection. Also included are PNL's comments on the related issues of Surveillance and Maintenance, and Administrative Controls. The conclusions drawn from PNL's evaluation of these issues form the basis for two additional topics addressed in the report: Critical Elements Required to Establish Diesel Engine Operability and Reliability, and Considerations for Interim Licensing

  13. Engineering and planning for decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Gans, G.M. Jr.

    1982-01-01

    With the publication of NUREG-0586, ''Draft Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities'' in January, 1981 the Nuclear Regulatory Commission staff has put the industry on notice that the termination of operating licenses and the final disposal of physical facilities will require the early consideration of several options and approaches and the preparation of comprehensive engineering and planning documents for the selected option at the end of useful life. This paper opens with a discussion of the options available and the principal aspects of decommissioning. The major emphasis of the composition is the nature of documents, the general approach to be followed, and special considerations to be taken into account when performing the detailed engineering and planning for decommissioning, as the end of life approaches and actual physical disposal is imminent. The author's main point of reference is on-going work by Burns and Roe, with Nuclear Energy Services, under contract to the Department of Energy's Richland Office, to perform the engineering and planning for the decommissioning of the Shippingport Atomic Power Station in Pennsylvania

  14. The nuclear industry's plan to achieve new nuclear power plant orders in the 1990's

    International Nuclear Information System (INIS)

    Bayne, P.

    1993-01-01

    Since the Arab Oil Embargo of 1973, there has been a direct relationship between the growth in the Gross Domestic Product and the growth in the use of electricity in the United States. That close relationship between economic growth and electricity will continue. If that is true, the United States Department of Energy says this country will need between 190,000 to 275,000 megawatts of new generating capacity in the next 20 years. Electricity is one of the cleanest and most efficient uses of energy. Of all the ways to generate electricity, nuclear power plants are the cleanest, producing no air pollution and no greenhouse gases. To help supply the needed increase in electricity generating capacity, the US nuclear power industry has developed a Strategic Plan for Building New Nuclear Power Plants. The plan identified fourteen issues which must be dealt with to create the conditions under which utilities could place orders for new nuclear plants by the mid-1990's. The plan was published in November of 1990 and significant progress has been made on most of the fourteen issues. The plan and progress made are reviewed in depth

  15. Problems of heat sources modeling on stage of isolated power systems expansion planning

    International Nuclear Information System (INIS)

    Malenkov, A.V.; Reshetnikova, L.N.; Sergeev, Yu.A.

    1998-01-01

    It is necessary to use computer codes for evaluation of possible applications and role of nuclear district heating plants in the local self-balancing power and heating systems, which are to be located in the remote isolated and hardly accessible regions in the Far North of Russia. Key factors in determining system configurations and its performances are: (1) interdependency of electricity, heat and fuel supply; (2) long distance between energy consumer centres (from several tens up to some hundred kilometers); and (3) difficulty in export and import of the electricity, especially the fuel in and from neighbouring and remote regions. The problem to challenge is to work out an optimum expansion plan of the local electricity and heat supply system. The ENPEP (ENergy and Power Evaluation Program) software package, which was developed by IAEA together with the USA Argonne National Laboratory, was chosen for this purpose. The Chaun-Bilibino power system (CBPS), an isolated power system in far North-East region of Russia, was selected as the first case of the ENPEP study. ENPEP allows a complex approach in the system expansion optimization planning in the time frame of planning period of up to 30 years. The key ENPEP module, ELECTRIC, considers electricity as the only product. The cogeneration part (heat production) must be considered outside the ELECTRIC model and then the results to be transfer ed to ELECTRIC. The ENPEP study on the Chaun-Bilibino isolated power system has shown that the modelling of the heat supply sources in ENPEP is not a trivial problem. It is very important and difficult to correctly represent specific features of cogeneration process at the same time. (author)

  16. The Wind Power Handbook. Planning and approval of wind power plants on shore and in coastal areas; Vindkraftshandboken. Planering och proevning av vindkraftverk paa land och i kustnaera vattenomraaden

    Energy Technology Data Exchange (ETDEWEB)

    2009-01-15

    The Wind Power Handbook is designed to make it easier for municipalities and wind energy companies to plan wind power projects. It contains the issues to be considered when planning and review, both the legal bases under essentially Planning and Building Act and the Environmental Code and the environmental assessments. The manual is primarily addressed to the municipalities and various operators. There are many interests to be met at a wind power establishment, which requires knowledge and cooperation of the different actors on the planning and approval process to be effective. Here we have gathered important knowledge base to facilitate the process and to contribute to a balanced decision

  17. Statistical methods for the planning of inspections

    International Nuclear Information System (INIS)

    Hough, C.G.; Beetle, T.M.

    1976-01-01

    Inspection plans are designed to detect diversions of M kilograms of nuclear material with a high degree of confidence. Attribute sample plans were first developed and applied at a zero-energy fast reactor in the United Kingdom in co-operation with the Agency. Battelle-Northwest in the United States of America proposed a variables sample plan based on decision theory. The Karlsruhe Research Center in the Federal Republic of Germany developed the strategic points concept and sample plans based on game theory considerations. All these approaches were combined into a common approach which is summarized in this report. (author)

  18. Socioeconomic effects of power marketing alternatives for the Central Valley and Washoe Projects: 2005 regional econmic impact analysis using IMPLAN

    International Nuclear Information System (INIS)

    Anderson, D.M.; Godoy-Kain, P.; Gu, A.Y.; Ulibarri, C.A.

    1996-11-01

    The Western Area Power Administration (Western) was founded by the Department of Energy Organization Act of 1977 to market and transmit federal hydroelectric power in 15 western states outside the Pacific Northwest, which is served by the Bonneville Power Administration. Western is divided into four independent Customer Service Regions including the Sierra Nevada Region (Sierra Nevada), the focus of this report. The Central Valley Project (CVP) and the Washoe Project provide the primary power resources marketed by Sierra Nevada. Sierra Nevada also purchases and markets power generated by the Bonneville Power Administration, Pacific Gas and Electric (PG ampersand E), and various power pools. Sierra Nevada currently markets approximately 1,480 megawatts of power to 77 customers in northern and central California. These customers include investor-owned utilities, public utilities, government agencies, military bases, and irrigation districts. Methods and conclusions from an economic analysis are summarized concerning distributional effects of alternative actions that Sierra Nevada could take with it's new marketing plan

  19. New fire and security rules change USA nuclear power plant emergency plans

    International Nuclear Information System (INIS)

    Garrou, A.L.

    1978-01-01

    New safety and security rules for nuclear power plants have resulted from the Energy Reorganisation Act and also from a review following the Browns Ferry fire. The content of the emergency plan which covers personnel, plant, site, as well as a general emergency, is outlined. New fire protection rules, the plan for security, local and state government assistance are also discussed, with a brief reference to the impact of the new rules on continuity of operations. (author)

  20. Change in perception of people towards a nuclear emergency plan for a nuclear power station after being presented

    International Nuclear Information System (INIS)

    Kouzen, Hideharu

    2017-01-01

    We conducted a group interview survey for 24 persons living in urban areas of the Kansai region to understand the change in their perception of information about nuclear emergency plans for nuclear power stations. The participants were given descriptions about a nuclear emergency plan based on plans that had been prepared by the national government and local government. Before hearing the explanation about the nuclear emergency plan, we found that only a few participants were concerned about it, but no one knew the detailed contents. For the question 'Do you think the nuclear emergency plan is being improved after the Fukushima Daiichi Nuclear Power Plant accident?', we found 6 persons among the 24 held opinions saying that the plan was 'improved' or 'somewhat improved'. However, after hearing the explanation and a brief Q and A session about it, 18 persons held opinions saying the plan was 'improved' or 'somewhat improved'. As the reason for such answers, the most common opinion shared by 13 persons was that 'a nuclear emergency plan is being made'. There is a possibility that urban residents had not known the facts about specific disaster prevention plans for each nuclear power station that have been formulated. (author)

  1. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  2. 76 FR 81487 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-12-28

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project Post-2017 Remarketing AGENCY... . Information regarding Western's BCP Post-2017 marketing efforts, the Energy Management and Planning Program... Proposals. SUMMARY: The Western Area Power Administration (Western), a Federal power marketing agency of the...

  3. Integrated multiperiod power generation and transmission expansion planning with sustainability aspects in a stochastic environment

    International Nuclear Information System (INIS)

    Seddighi, Amir Hossein; Ahmadi-Javid, Amir

    2015-01-01

    This paper presents a multistage stochastic programming model to address sustainable power generation and transmission expansion planning. The model incorporates uncertainties about future electricity demand, fuel prices, greenhouse gas emissions, as well as possible disruptions to which the power system is subject. A number of sustainability regulations and policies are considered to establish a framework for the social responsibility of the power system. The proposed model is applied to a real-world case, and several sensitivity analyses are carried out to provide managerial insights into different aspects of the model. The results emphasize the important role played by sustainability policies on the configuration of the power grid. - Highlights: • This paper considers integrated power generation and transmission expansion planning. • Sustainability aspects are incorporated into a multiperiod stochastic setting. • A stochastic mathematical programming model is developed to address the problem. • The model is applied to a real-world case and numerical studies are carried out

  4. Supply disruption cost for power network planning

    International Nuclear Information System (INIS)

    Kjoelle, G.H.

    1992-09-01

    A description is given of the method of approach to calculate the total annual socio-economic cost of power supply disruption and non-supplied energy, included the utilities' cost for planning. The total socio-economic supply disruption cost is the sum of the customers' disruption cost and the utilities' cost for failure and disruption. The mean weighted disruption cost for Norway for one hour disruption is NOK 19 per kWh. The customers' annual disruption cost is calculated with basis in the specific disruption cost referred to heavy load (January) and dimensioning maximum loads. The loads are reduced by factors taking into account the time variations of the failure frequency, duration, the loads and the disruption cost. 6 refs

  5. Comparisons of ANS, ASME, AWS, and NFPA standards cited in the NRC standard review plan, NUREG-0800, and related documents

    International Nuclear Information System (INIS)

    Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Spiesman, J.B.

    1995-11-01

    This report provides the results of comparisons of the cited and latest versions of ANS, ASME, AWS and NFPA standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC's Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review

  6. Planning of a Quadgeneration power plant for Jammerbugt energy system

    DEFF Research Database (Denmark)

    Rudra, Souman; Hoffmann, Jessica; Rosendahl, Lasse

    2011-01-01

    Quadgeneration is the simultaneous production of power, heat and cooling and different fuels from flexible feedstocks such as biomass, waste, refinery residue etc. In order to accommodate more renewable energy into the energy system, it is extremely necessary to develop new flexible power plants...... of some equipments in the Quadgeneration power plant. This paper presents two models for the investment planning of a Quadgeneration energy system in Jammerbugt municipality, and uses these models for different case studies addressing the system for production of heat, cooling, liquid fuels...... that can quickly increase or decrease the production of electricity. Such plants should be ultra flexible in terms of production and able to run on many different types of fuels, with one of its major outputs being liquid fuels for the transport sector. The aim of this paper is to integrate district...

  7. Fuzzy possibilistic model for medium-term power generation planning with environmental criteria

    International Nuclear Information System (INIS)

    Muela, E.; Schweickardt, G.; Garces, F.

    2007-01-01

    The aim of this paper is to apply a fuzzy possibilistic model to the power generation planning that includes environmental criteria. Since it is not always meaningful to relate uncertainty to frequency, the proposed approach analyzes the imprecision and ambiguity into the decision making, especially when the system involves human subjectivity. This paper highlights the subjacent differences between fuzzy and possibilistic entities. Additionally, it illustrates the use of fuzzy sets theory and possibility theory for modeling flexibility, and nonprobablistic uncertainty, respectively. The necessity of a new direction for the environmental problem in a power system is outlined, an approach that attempts a greater integral quality of planning instead of searching for a simple optimal solution. This process must be consistent with a wider and more suitable interpretation about both the problem as such and the concept of solution in uncertain situations

  8. 75 FR 19966 - Boulder Canyon Project-Post-2017 Application of the Energy Planning and Management Program Power...

    Science.gov (United States)

    2010-04-16

    ... Application of the Energy Planning and Management Program Power Marketing Initiative AGENCY: Western Area... and Management Program (Program) Power Marketing Initiative (PMI) (10 CFR part 905) to the Boulder... Power Administration (Western), Desert Southwest Region, a Federal power marketing agency of the...

  9. MILP Approach for Bilevel Transmission and Reactive Power Planning Considering Wind Curtailment

    DEFF Research Database (Denmark)

    Ugranli, Faruk; Karatepe, Engin; Nielsen, Arne Hejde

    2017-01-01

    In this study, two important planning problems in power systems that are transmission expansion and reactive power are formulated as a mixed-integer linear programming taking into account the bilevel structure due to the consideration of market clearing under several load-wind scenarios....... The objective of the proposed method is to minimize the installation cost of transmission lines, reactive power sources, and the annual operation costs of conventional generators corresponding to the curtailed wind energy while maintaining the reliable system operation. Lower level problems of the bilevel...... structure are designated for the market clearing which is formulated by using the linearized optimal power flow equations. In order to obtain mixed-integer linear programming formulation, the so-called lower level problems are represented by using primal-dual formulation. By using the proposed method, power...

  10. The Pacific northwest stream quality assessment

    Science.gov (United States)

    Van Metre, Peter C.; Morace, Jennifer L.; Sheibley, Rich W.

    2015-01-01

    In 2015, the U.S. Geological Survey (USGS) National Water-Quality Assessment (NAWQA) program is assessing stream quality in the Pacific Northwest. The goals of the Pacific Northwest Stream Quality Assessment (Pacific Northwest study) are to assess the quality of streams in the region by characterizing multiple water-quality factors that are stressors to aquatic life and to evaluate the relation between these stressors and biological communities. The effects of urbanization and agriculture on stream quality for the Puget Lowlands and Willamette Valley are the focus of this regional study. Findings will provide the public and policymakers with information regarding which human and environmental factors are the most critical in affecting stream quality and, thus, provide insights about possible approaches to protect or improve the health of streams in the region.

  11. StreamNet; Northwest Aquatic Resource Information Network - Status of Salmon and Steelhead in the Columbia River Basin, 1995 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Duane A.; Beamesderfer, Raymond C. [Oregon Dept. of Fish and Wildlife, Enterprise, OR (United States); Woodard, Bob [Washington Dept. of Fish and Wildlife, Olympia, WA (United States)

    1996-04-01

    Information on fish populations, fisheries, and fish habitat is crucial to the success of ongoing program to protect, recover, enhance, and manage fish resources in the Columbia River Basin. However, pertinent data are often difficult to locate because it is scattered among many agencies and is often unpublished. The goal of this annual report is to bring many diverse data types and sources into a single comprehensive report on the status of anadromous fish runs in the Columbia River Basin and the environmental conditions that may affect that status. Brief summaries are provided to identify the type and scope of available information. This synopsis is intended to complement other more detailed reports to which readers are referred for comprehensive treatment of specific subjects. This first report focuses mainly on anadromous salmon and steelhead (primarily through 1994) but the authors intend to expand the scope of future issues to include resident species. This is the first of what the authors intend to be an annual report. They welcome constructive suggestions for improvements. This report is a product of the StreamNet (formerly Coordinated Information System and Northwest Environmental Data Base) project which is a part of the Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The project is called for in the Fish and Wildlife Program of the Northwest Power Planning Council. The project`s objective is to promote exchange and dissemination of information in a standardized electronic format throughout the basin. This project is administered by the Pacific States Marine Fisheries Commission with active participation by tribal, state, and federal fish and wildlife agencies.

  12. Primary Water Chemistry Control during a Planned Outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, Guoping; Nashiem, Rod; Matheson, Shane; Yabar, Berman; Harper, Bill; Roberts, John G.

    2012-09-01

    Bruce Power has developed a comprehensive outage water chemistry program, which includes both primary and secondary chemistry requirements during planned outages. The purpose of the program is to emphasize the chemistry requirements during outages and subsequent start-ups in order to maintain the integrity of the systems, minimise activity transport and radiation fields, reduce the Carbon-14 release, and to ensure that the requirements are integrated with the outage management program. Prior to a planned outage, Station Chemical Technical Sections identify outage chemistry requirements to Operations and Outage Planning and ensure that work necessary to correct system chemistry issues is within outage work scope. The outage water chemistry program provides direction for establishing alternative sampling locations as demanded by the system configuration during the outage and identifies outage prerequisites for nuclear system purification capabilities. These requirements are contained in an outage checklist. The paper mainly highlights the primary water chemistry issues and chemistry control strategies during planned outages and discusses challenges and successes. (authors)

  13. Analysis of the Radio-Ecological State of Units and Installations Involved in Nuclear Submarine Decommissioning in the Northwest Region of Russia

    National Research Council Canada - National Science Library

    Sarkissov, A

    2003-01-01

    .... in the first section of the report, all nuclear-powered units and installations involved in the process of nuclear submarine utilization in the northwest region of Russia are listed and considered in detail...

  14. Renewable Energy in Danish Municipalities - an Evaluation of The Planning Framework for Wind Power

    DEFF Research Database (Denmark)

    Sperling, Karl; Hvelplund, Frede; Mathiesen, Brian Vad

    2009-01-01

    Wind power is a maturing technology that in a number of countries is likely to contribute a major share to fully renewable energy systems. Denmark has a comparably long history of wind power development and is planning to continue expanding the existing capacity. If a large-scale penetration of w...

  15. Effect of economic parameters on power generation expansion planning

    International Nuclear Information System (INIS)

    Sevilgen, Sueleyman Hakan; Hueseyin Erdem, Hasan; Cetin, Burhanettin; Volkan Akkaya, Ali; Dagdas, Ahmet

    2005-01-01

    The increasing consumption of electricity within time forces countries to build additional power plants. Because of technical and economic differences of the additional power plants, economic methodologies are used to determine the best technology for the additional capacity. The annual levelized cost method is used for this purpose, and the technology giving the minimum value for the additional load range is chosen. However, the economic parameters such as interest rate, construction escalation, fuel escalation, maintenance escalation and discount factor can affect the annual levelized cost considerably and change the economic range of the plants. Determining the values of the economical parameters in the future is very difficult, especially in developing countries. For this reason, the analysis of the changing rates of the mentioned values is of great importance for the planners of the additional capacity. In this study, the changing rates of the economic parameters that influence the annual levelized cost of the alternative power plant types are discussed. The alternative power plants considered for the electricity generation sector of Turkey and the economic parameters dominating each plant type are determined. It is clearly seen that the annual levelized cost for additional power plants varies with the economic parameters. The results show that the economic parameters variation has to be taken into consideration in electricity generation planning

  16. 77 FR 2355 - Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and...

    Science.gov (United States)

    2012-01-17

    ... advantages; distributive impacts; and equity); (4) to the extent feasible, specify performance objectives... Defense Council (NRDC), the Northwest Energy Efficiency Alliance (NEEA), and the Northwest Power and... Strategic Plan commits the Department to reviewing minimum appliance efficiency standards at least every 5...

  17. Power plans seek funds [in Indo-China

    International Nuclear Information System (INIS)

    Dansie, J.

    1995-01-01

    A conference in Vietnam on the Power Sector in Indochina and Myanmar in September 1995 is reported. The current power scenario in Vietnam and future government hopes and plans were outlined. In 1994 Vietnam had a total installed capacity of 4470 MW, of which 63% was hydropower. By 2010 it is hoped to increase total capacity to 18,000 MW with the hydropower contribution reduced to 50%. It is hoped to attract the US$20bn required to finance this development from investment by international organizations and private operators. However, problems exist in the form of uncertainties in Vietnamese law with respect to foreign investment and Vietnam's non-convertible currency. Vietnam is keen to attract hard currency but reluctant to let it out of the country as foreign companies would wish to do with their profits. Myanmar has been further to go than Vietnam in developing its huge hydropower resources to meet growing demand for electric power. About 40% of the country's peak demand of 550 MW is generated by hydropower but this represents only 1% of the total hydropower resource. Demand is expected to rise to 1500 MW by 2000. Again foreign investment is being sought. As in Vietnam, though, the question of an inconvertible currency arises. In addition, the subsidised low tariff in Myanmar promises only a low rate of return and the country is fighting high inflation. (U.K.)

  18. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  19. StreamNet Query System: Smolt Density Model

    Data.gov (United States)

    Pacific States Marine Fisheries Commission — In response to a need for Columbia Basin wide evaluation of anadromous production potential during the Northwest Power Planning Council's Subbasin Planning Process,...

  20. Some special problems during the planning and construction of the Paks nuclear power station

    Energy Technology Data Exchange (ETDEWEB)

    Szilagyi, G.; Szalai, G.; Ferenczy, G.; Sarkoezy, E.; Daniel, G. (Eroemue es Halozattervezoe Vallalat, Eroeterv, Budapest (Hungary))

    1984-01-01

    The construction of the power plant building using cradle case technology is outlined. The planning and construction of the auxiliary building for waste storage, for water-treatment equipment and others are described. The planning and specifications of a part of the electrical and control systems are presented briefly. Finally, the use of computer-aided design techniques is mentioned.

  1. THE NIGERIAN GAS MASTER-PLAN, INVESTMENT OPPORTUNITIES, CHALLENGES, ISSUES AFFECTING POWER SECTOR: AN ANALYSIS

    Directory of Open Access Journals (Sweden)

    R. INGWE

    2014-11-01

    Full Text Available The Nigerian Gas Master-Plan, Investment Opportunities, Challenges, Issues Affecting Power Sector: an Analysis. The objective of this article is to contribute towards understanding of the Nigerian Gas Master Plan (NGMP/Plan and its bifurcations with key socio-economic development factors. I applied the method of discourse to bring to being some points that have hitherto been unknown about the Master-plan and its inter-relationships and bifurcations. Elaborated here are the spectacular gains that have accrued to the Latin American country, Trinidad and Tobago, from its recent development of natural gas resources. This was considered suitable and significant here for highlighting that if such spectacular achievements could be realized from Trinidad and Tobago’s relatively smaller gas deposit (15.3 tcf, probable reserves (8.4 tcf, possible reserves (6.2 tcf would be by far greater considering Nigeria’s larger natural gas reserves (184 tcf wealth as earlier stated. I show that the Plan is well designed relevant to addressing Nigeria’s current development needs generally. It presents potentials for stimulating Nigeria’s economic growth by harnessing the country’s abundant natural gas reserves. The Plan enumerates/ elaborates huge investment opportunities. Some challenges likely to be faced in the implementation/management of the Plan are already being surmounted as recent reports show that some of its key investments have been realized and the required infrastructure are being provided. Regarding the issues in the Master-plan that are likely to affect and are affecting Nigeria’s power sector development, I reckon that they are mostly positive factors due to the way the plan promises to stimulate electricity generation in our country.

  2. The management plan preparation activities nuclear power plant in Indonesia

    International Nuclear Information System (INIS)

    Utomo

    2011-01-01

    A feasibility Study that has been updated show that two nuclear power units with each unit of power up to 1000 MWe can represent decently an economical alternative energy supply. It added that the available time schedule was quite tight so that the preparation for the development must be starting first. This paper will discuss the preparation of plans of the first nuclear power plant which includes program activities, the structure of contracts, schedules of activities and funding. From the information obtained to date that in addition to a candidate site that is ready to be built in Muria peninsula is still required another potential alternative site besides to search other complete data information. This site investigation activities completed within the time schedule was passed ''critical path'', so that these activities should be carried out intensively and obey the time. This paper describes the steps that need to be prepared to welcome the first nuclear power plant, after reviewing the various input above and apply the reality in Indonesia as the initial conditions. (author)

  3. Achievements in emergency medical rescue service, North-West ...

    African Journals Online (AJOL)

    2006-08-28

    Aug 28, 2006 ... In North-West province this process of provincialisation took place in ... Emergency Medical Rescue Service, Department of Health, North-West. Victor R .... recovery after CPR treatment should be started as soon as possible ...

  4. Planning and architectural safety considerations in designing nuclear power plants

    International Nuclear Information System (INIS)

    Konsowa, Ahmed A.

    2009-01-01

    To achieve optimum safety and to avoid possible hazards in nuclear power plants, considering architectural design fundamentals and all operating precautions is mandatory. There are some planning and architectural precautions should be considered to achieve a high quality design and construction of nuclear power plant with optimum safety. This paper highlights predicted hazards like fire, terrorism, aircraft crash attacks, adversaries, intruders, and earthquakes, proposing protective actions against these hazards that vary from preventing danger to evacuating and sheltering people in-place. For instance; using safeguards program to protect against sabotage, theft, and diversion. Also, site and building well design focusing on escape pathways, emergency exits, and evacuation zones, and the safety procedures such as; evacuation exercises and sheltering processes according to different emergency classifications. In addition, this paper mentions some important codes and regulations that control nuclear power plants design, and assessment methods that evaluate probable risks. (author)

  5. Strategic plan for the development of core technologies for the Korean advanced nuclear power reactor for export

    International Nuclear Information System (INIS)

    Moon, Joo Hyun; Cho, Young Ho

    2010-01-01

    With the soaring oil price and worsening global warming, nuclear power has attracted considerable attention on a global scale and a new large market of nuclear power plants (NPPs) is expected. The Korean government aims to export up to 10 NPPs by 2012, based on the successful export of 2 NPPs to the UAE in 2009. It is also going to develop a follow-up model of the Advanced Power Reactor (APR) 1400, and join the world's NPP market under the banner of Korea's original reactor type. For this, it promulgated the strategic plan, NuTech 2012, a technology development plan intended for the early acquisition of core technologies for the Korean advanced NPP design and domestic production of the main components in NPP. This paper introduces the strategic plan of NuTech 2012. (orig.)

  6. Fuel cell power systems for remote applications. Phase 1 final report and business plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The goal of the Fuel Cell Power Systems for Remote Applications project is to commercialize a 0.1--5 kW integrated fuel cell power system (FCPS). The project targets high value niche markets, including natural gas and oil pipelines, off-grid homes, yachts, telecommunication stations and recreational vehicles. Phase 1 includes the market research, technical and financial analysis of the fuel cell power system, technical and financial requirements to establish manufacturing capability, the business plan, and teaming arrangements. Phase 1 also includes project planning, scope of work, and budgets for Phases 2--4. The project is a cooperative effort of Teledyne Brown Engineering--Energy Systems, Schatz Energy Research Center, Hydrogen Burner Technology, and the City of Palm Desert. Phases 2 through 4 are designed to utilize the results of Phase 1, to further the commercial potential of the fuel cell power system. Phase 2 focuses on research and development of the reformer and fuel cell and is divided into three related, but potentially separate tasks. Budgets and timelines for Phase 2 can be found in section 4 of this report. Phase 2 includes: Task A--Develop a reformate tolerant fuel cell stack and 5 kW reformer; Task B--Assemble and deliver a fuel cell that operates on pure hydrogen to the University of Alaska or another site in Alaska; Task C--Provide support and training to the University of Alaska in the setting up and operating a fuel cell test lab. The Phase 1 research examined the market for power systems for off-grid homes, yachts, telecommunication stations and recreational vehicles. Also included in this report are summaries of the previously conducted market reports that examined power needs for remote locations along natural gas and oil pipelines. A list of highlights from the research can be found in the executive summary of the business plan.

  7. When it is unfamiliar to me: Local acceptance of planned nuclear power plants in China in the post-fukushima era

    International Nuclear Information System (INIS)

    Guo, Yue; Ren, Tao

    2017-01-01

    Many contributions have been made in the studies of the factors that influence public acceptance of nuclear power. However, previous studies seldom focused on nuclear power plants in the planning stage. Actually public perception is usually more sensitive at the preliminary planning stage of a nuclear power station. Mainly utilizing questionnaire survey and focus group methods, we have identified the factors that are correlated with local acceptance of planned nuclear power plants in China. We conducted our survey in two cities, Huludao, Liaoning province in northern China, and Shanwei, Guangdong province in southern China, where the local government was planning to build its first nuclear power plant. We find that people who live closer to the plant sites are less willing to accept nuclear power than those who live farther away. As for “surface psychology” factors, perceived benefits and risks significantly influence local acceptance. As for “deep psychology” factors, emotional identification and social trust can significantly influence local acceptance, while perceived knowledge cannot. When citizens are unfamiliar with nuclear power plants, they are more inclined to evaluate the benefits and risks through emotional identification and social trust, rather than through pure rational deduction based on concrete facts. - Highlights: • We focus on the local acceptance of nuclear power in the planning stages. • People who live closer to plant sites are less willing to accept nuclear power. • Perceived benefits and risks significantly influence local acceptance. • Emotional identification and trust can significantly influence local acceptance. • While perceived knowledge cannot significantly influence local acceptance.

  8. Institutional plan -- Institute of Nuclear Power Operations, 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The US nuclear electric utility industry established the Institute of Nuclear Power Operations (INPO) in 1979 to promote the highest levels of safety and reliability -- to promote excellence -- in the operation of its nuclear plants. After its formation, the Institute grew from a handful of on-loan personnel in late 1979 to an established work force of more than 400 permanent and on-loan personnel. INPO's early years were marked by growth and evolution of its programs and organization. The Institute now focuses primarily on the effectiveness and enhancement of established programs and activities. For INPO to carry out its role, it must have the support of its members and participants and a cooperative but independent relationship with the NRC. A basis for that support and cooperation is an understanding of INPO's role. This Institutional Plan is intended to provide that understanding by defining the Institute's role and its major programs. This plan considers the existing and projected needs of the industry and the overall environment in which INPO and its members and participants operate

  9. Decommissioning plan of the nuclear-powered ship 'Mutsu'

    International Nuclear Information System (INIS)

    1992-01-01

    The nuclear-powered ship 'Mutsu' is to be decommissioned at Sekinehama Port immediately after finishing the experimental voyage based on the 'Fundamental plan on the research required for the development of nuclear ships in Japan Atomic Energy Research Institute' decided in March, 1985. The decommissioning plan which determines the methods of the works regarding the decommissioning and others is as follows. In order to utilize the ship hull of Mutsu, the reactor room including the reactor and shielding is removed in a lump, and the removal and isolation method of preserving it as it is on land is adopted. The measures for environment preservation and ensuring the safety of residents are taken, and the sufficient work control is carried out for preventing accidents and reducing the radiation exposure of workers. The ship is used as the ship with ordinary propulsion system for ocean research and the research and development of marine reactors. The utilization of Sekinehama and Ominato facilities is investigated. The reactor room removed from Mutsu is exhibited to public, being preserved safely in a building. (K.I.)

  10. Life extension program initiation at Davis-Besse nuclear power station

    International Nuclear Information System (INIS)

    Staudinger, Deborah K.

    1991-01-01

    Davis-Besse is a 900 MW Babcock and Wilcox designed plant located in Northwest Ohio. Effective December 31, 1990, the construction period was recovered making the current license expiration 2007. The economic effects of this extension reduced the depreciation expense for 1990 by $9,790,000 and increased earnings per share by $.04. This positive impact has resulted in an evaluation of pursuing license renewal for Davis-Besse in accordance with the proposed rule on license renewal (10CFR54 'Requirements for renewal of operating licenses for nuclear power plants'). This paper reviews preliminary efforts to evaluate these actions and summarizes strategies planned to ensure continued operation of Davis-Besse remains a viable option for base load generation for Toledo Edison. (author)

  11. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, Marcel Y.; Gervais, Todd L.

    2004-11-15

    The Pacific Northwest National Laboratory (PNNL) operates a number of Research & Development (R&D) facilities for the U.S. Department of Energy (DOE) on the Hanford Site. Facility effluent monitoring plans (FEMPs) have been developed to document the facility effluent monitoring portion of the Environmental Monitoring Plan (DOE 2000) for the Hanford Site. Three of PNNL’s R&D facilities, the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling, and individual FEMPs were developed for these facilities in the past. In addition, a balance-of-plant (BOP) FEMP was developed for all other DOE-owned, PNNL-operated facilities at the Hanford Site. Recent changes, including shutdown of buildings and transition of PNNL facilities to the Office of Science, have resulted in retiring the 3720 FEMP and combining the 331 FEMP into the BOP FEMP. This version of the BOP FEMP addresses all DOE-owned, PNNL-operated facilities at the Hanford Site, excepting the Radiochemical Processing Laboratory, which has its own FEMP because of the unique nature of the building and operations. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R&D. R&D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in Appendix A. Potential radioactive airborne emissions in the BOP facilities are estimated annually using a building inventory-based approach provided in federal regulations. Sampling at individual BOP facilities is based on a potential-to-emit assessment. Some of these facilities are considered minor emission points and thus are sampled routinely, but not continuously, to confirm the low emission potential. One facility, the 331 Life Sciences Laboratory, has a major emission point and is sampled continuously. Sampling systems are

  12. Some special problems during the planning and construction of the Paks nuclear power station

    International Nuclear Information System (INIS)

    Szilagyi, Gyula; Szalai, Geza; Ferenczy, Gabor; Sarkoezy, Endre; Daniel, Gabor

    1984-01-01

    The construction of the power plant building using cradle case technology is outlined. The planning and construction of the auxiliary building for waste storage, for water-treatment equipment and others are described. The planning and specifications of a part of the electrical and control systems are presented briefly. Finally, the use of computer-aided design techniques is mentioned. (R.P.)

  13. Characterization program management plan for Hanford K Basin spent nuclear fuel

    International Nuclear Information System (INIS)

    Lawrence, L.A.

    1998-01-01

    The management plan developed to characterize the K Basin Spent Nuclear Fuel was revised to incorporate actions necessary to comply with the Office of Civilian Radioactive Waste Management Quality Assurance Requirements Document 0333P. This plan was originally developed for Westinghouse Hanford Company and Pacific Northwest National Laboratory to work together on a program to provide characterization data to support removal, conditioning, and subsequent dry storage of the spent nuclear fuels stored at the Hanford K Basins. This revision to the Program Management Plan replaces Westinghouse Hanford Company with Duke Engineering and Services Hanford, Inc., updates the various activities where necessary, and expands the Quality Assurance requirements to meet the applicable requirements document. Characterization will continue to utilize the expertise and capabilities of both organizations to support the Spent Nuclear Fuels Project goals and objectives. This Management Plan defines the structure and establishes the roles for the participants providing the framework for Duke Engineering and Services Hanford, Inc. and Pacific Northwest National Laboratory to support the Spent Nuclear Fuels Project at Hanford

  14. Effects of climate change on Pacific Northwest water-related resources: Summary of preliminary findings

    Energy Technology Data Exchange (ETDEWEB)

    Scott, M.J.; Sands, R.D.; Vail, L.W.; Chatters, J.C.; Neitzel, D.A.; Shankle, S.A.

    1993-12-01

    The Pacific Northwest Case Study is a multi-agency analysis of atmospheric/climatic change impacts on the Pacific Northwest (which includes Washington, Oregon, Idaho, and portions of the Columbia River Basin in Western Montana). The purpose of the case study, which began in fiscal year 1991, was to develop and test analytical tools, as well as to develop an assessment of the effects of climate change on climate-sensitive natural resources of the Pacific Northwest and economic sectors dependent on them. The overall study, jointly funded by the US Department of Energy (DOE) and the US Environmental Protection Agency, was a broad-based, reconnaissance-level study to identify potential climate impacts on agriculture, coastal resources, forest resources, and irrigation in the Pacific Northwest. DOE participated in the reconnaissance study, with responsibility for hydroelectric and water supply issues. While this report briefly discusses a broader array of water issues, attention is mainly focused on three aspects of the water study: (1) the effects of the region`s higher temperatures on the demand for electric power (which in turn puts additional demand on hydroelectric resources of the region); (2) the effects of higher temperatures and changes, both in precipitation amounts and seasonality, on river flows and hydroelectric supply; and (3) the effect of higher temperatures and changed precipitation amounts and seasonality on salmonid resources -- particularly the rearing conditions in tributaries of the Columbia River Basin. Because the meaning of regional climate forecasts is still quite uncertain, most of the preliminary findings are based on sensitivity analyses and historical analog climate scenarios.

  15. State and local planning procedures dealing with social and economic impacts from nuclear power plants

    International Nuclear Information System (INIS)

    Curry, M.; Goodrieght, J.; Green, M.; Merwin, D.; Smith, R.

    1977-01-01

    The roles of state and local agencies in planning for and managing social and economic impacts of nuclear power plants are studied. In order to be effective in these roles state and local agencies must work with each other as well as the NRC. A comparative case study approach is used which analyzes six sites in three West Coast states. The case studies included plants in operation, plants under construction, and plants still in the planning stages. In contrast to some states, all three of these states have moderately centralized procedures for siting power plants, and all have strong environmental laws

  16. 76 FR 45741 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Diesel-Powered Motor...

    Science.gov (United States)

    2011-08-01

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Diesel-Powered Motor Vehicle Idling Act AGENCY... the Commonwealth's Diesel-Powered Motor Vehicle Idling Act (Act 124 of 2008, or simply Act 124) into... allowable time that heavy-duty, commercial highway diesel vehicles of over 10,000 pounds gross vehicle...

  17. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 3: Space power and thermal management

    International Nuclear Information System (INIS)

    1991-06-01

    Viewgraphs of briefings from the SSTAC/ARTS review of the draft integrated technology plan on thermal power and thermal management are presented. Topics covered include: space energy conversion research and technology; space photovoltaic energy conversion; chemical energy conversion and storage; thermal energy conversion; power management; thermal management; space nuclear power; high capacity power; surface power and thermal management; space platforms power and thermal management; and project SELENE

  18. Experience with the Agency's WASP for nuclear power planning in developing countries

    International Nuclear Information System (INIS)

    1986-02-01

    An Advisory Group Meeting to discuss recent experience with, and to suggest improvements to, Wien Automatic System Planning Program (WASP), was held in Vienna in September 1985. It was clear from the meeting that WASP is a very useful tool as an aid in planning electric power generation systems. It is widely used in both developed and developing countries and its use will continue particularly if some of the suggestions for its improvements are implemented. A separate abstract was prepared for each of the 15 presentations of this meeting

  19. Policy planning for nuclear power: An overview of the main issues and requirements

    International Nuclear Information System (INIS)

    1993-08-01

    This special report, Policy Planning for Nuclear Power: An Overview of the Main Issues and Requirements, has been prepared in response to the express request of a number of IAEA Member States for a document to assist makers in developing countries on the introduction of nuclear power. The report contains information on the political, governmental, economic, financial and technical issues and requirements associated with planning and implementing a safe, economic and reliable nuclear power programme. It highlights the main areas in which policies must be developed and decisions taken, as well as the role and responsibilities of government, the plant owner and national industry. Also presented are the main criteria to assist policy planners in defining options and strategies which can achieve a balance among such objectives as cost effective and efficient electricity production, realistic and acceptable financing arrangements, national development requirements, safety and environmental protection. Further information and details on the technical and other issues presented in this report are given in the list of related IAEA publications and documents at the end of this report

  20. Pluri-annual planning of power generation investments. 2005-2015 era

    International Nuclear Information System (INIS)

    2006-01-01

    The pluri-annual planning of power generation investments (PPI) is provided by article 6 of the law from February 10, 2000 relative to the modernization and development of the electric utility. The PPI is the concrete translation of the energy policy and aims to identify the necessary investments with respect to the security of power supplies and beyond the already known commitments. In the framework of market deregulation and respect of competition, the PPI is limited to the identification of such investments but not to their realization. This document, which corresponds to the 2005 exercise, is the second report to the Parliament. It stresses on the following points: the mastery of power demand and the demand scenarios, the level of accepted risk, the carrying out of the development of renewable energy sources (5 GW by 2010 and 12.5 GW by 2016 for wind power, and 6 TWh more for biomass by 2016), the start-up of an EPR reactor in 2012, the investment needs for classical thermal power plants (+2.6 GW of diesel fuel power plants and +500 MW of combustion turbines as decided by EdF), the development of production means in 2 regions with specific needs: Provence-Alpes-Cote d'Azur and Bretagne (Brittany), and also in insular areas (Corsica and overseas territories), and the reflexions to carry on in continuation of the PPI. (J.S.)

  1. The long term plan for the integration of nuclear power plants into the Turkish Electrical Power System

    International Nuclear Information System (INIS)

    Kutukcuoglu, A.

    1974-03-01

    The report covers in detail the study of the expansion of the Turkish Electric Power System for the period 1980-1987. Load forecast is done by sectors and regions and inter-regions power balances gave the basis for the high voltage network configurations. Expansion alternatives are defined giving priority to hydroelectric projects, to local resources and nuclear power plants concurrently with conventional plants (lignite and oil). Several reactor strategies are analysed with LWR, HWR, FBR and HTGR power plants. Present worth value method is used for comparison of alternatives and sensitivity analysis is done for those ranked in the first places. Load flow, transient stability and frequency deviation studies of the power system are studied carefully by means of A.C. calculator and digital computer codes in order to see the influence of the introduction of large-sized power plants (600-750MW(e)) and their location in the power system. A 600MW(e) nuclear plant in 1983 and a second one of 750MW(e) in 1987 should, it is found, be commissioned into the system. The economic optimization was done with two computer programmes developed by KFA (Juelich): IACO for fuelling nuclear plant and RESTRAPO for power system with high hydroelectric component. The report is bound in three volumes: Volume I: Summary and Conclusions; Volume II: System Planning; Volume III: Electrical Survey

  2. Explaining wind power planning outcomes: some findings from a study in England and Wales

    International Nuclear Information System (INIS)

    Toke, Dave

    2005-01-01

    This paper discusses the factors that influence the outcome of onshore windfarm planning application in England and Wales. Various qualitative and quantitative methods have been employed, including regression analysis. Strong associations have been discovered between the outcome of local authority planning decisions, the opinions of local planning officers, the opinions of parish councils where the proposed windfarms are to be sited and the opinions of landscape protection groups. The attitude of people in the immediate vicinity of proposed windfarms is found to be the most important influence on the decisions made by local authorities. However, the local perception of the economic impact is of crucial importance in forming this judgement, as is the national political environment. The expected attitude of Appeal Inspectors is also important. It is concluded that there is a lot that wind power developers could do to improve the prospects of planning success. This includes engaging in local 'parish council' politics, talking to the closest residents to proposed schemes and encouraging local pro-wind power campaigns. Future projects are likely to be favoured by installing viewing towers at the tops of turbines to encourage visitors and in selling shares in the schemes to local people

  3. Optimization of the production plan and risk control in Third Qinshan Nuclear Power Co.,Ltd

    International Nuclear Information System (INIS)

    Zhou Jun

    2009-01-01

    Some optimized and improved measures have been taken in Third Qinshan Nuclear Power Co., Ltd. (TQNPC) to optimize the routine production plan management, strengthen the maintenance work risk analysis, and improve the plan execution capability. Which involve unified management of generation, refueling, periodic test and maintenance plans; simplifying the defect scale and reducing the intermediate link of defect treatment; intensifying the appraisal on plan execution and adopting star performance evaluation and merit rating measures. In this paper, the above-mentioned improvement and optimization are introduced comprehensively and systematically. (authors)

  4. Guidance for emergency planning in nuclear power plants; Vaegledning foer insatsplanering i kaerntekniska anlaeggningar

    Energy Technology Data Exchange (ETDEWEB)

    Magnusson, Tommy; Ekdahl, Maria (Ringhals AB, Vaeroebacka (Sweden))

    2008-06-15

    Ringhals has been a model for this study, but the purpose has been to make the report applicable at all nuclear power plants in Sweden. The work has been done in close co-operation with the Swedish nuclear power plants and Rescue Services in the nuclear power municipalities Oesthammar, Oskarshamn, and Varberg. The internal fire brigade at the nuclear power plants has also been involved. A document will also be published as a further guidance at efforts of the type fires, which are mentioned in the enclosed document. After a fire in a switchgear room in 2005 the need of making the existing effort planning more effective at nuclear power plants was observed. The idea with the planning is to plan the effort in order to give the operational and emergency staff a good and actual support to come to a decision and to start the mission without delay. The risk information is showed by planning layouts, symbols and drawings as basis, give risk information and effort information. The effort information shows outer arrangements, manual action points, fire installations, passive fire safety etc. The risk information is shown by risk symbols. Their purpose is to give a fast overview of the existing risks. Reactor safety effects is the ruling influence if an effort has to be done in order to secure safety for a third person. In order to make an effort in an area personal risks for rescue staff, such as electricity risks, radiological risks, chemicals and gas bottles with compressed gases, has to be eliminated. For complicated missions detailed instructions are needed in order to handle specific risks. In a group discussion different people with pertinent knowledge has to value which problematic efforts need detailed instruction. Missions that have to be analyzed in a work group as above are: fire may affect the reactor safety, fire that may threaten the structural integrity, chemical discharge with big consequence on environment/third person and handling of gas system (compressed

  5. Marginal thinning in Northwest Greenland during 2002-2011

    DEFF Research Database (Denmark)

    Khan, Shfaqat Abbas; Kjær, K. H.; Wahr, J. M.

    2012-01-01

    Many glaciers along the southeast and northwest coast of Greenland have accelerated, increasing the Greenland ice sheet's (GrIS) contribution to global sea-level rise. Here, we map elevation changes in northwest Greenland during 2003-2009 using high-resolution Ice, Cloud and land Elevation Satell...

  6. Optimal Planning and Operation Management of a Ship Electrical Power System with Energy Storage System

    DEFF Research Database (Denmark)

    Anvari-Moghaddam, Amjad; Dragicevic, Tomislav; Meng, Lexuan

    2016-01-01

    Next generation power management at all scales is highly relying on the efficient scheduling and operation of different energy sources to maximize efficiency and utility. The ability to schedule and modulate the energy storage options within energy systems can also lead to more efficient use...... of the generating units. This optimal planning and operation management strategy becomes increasingly important for off-grid systems that operate independently of the main utility, such as microgrids or power systems on marine vessels. This work extends the principles of optimal planning and economic dispatch...... for the proposed plan is derived based on the solution from a mixed-integer nonlinear programming (MINLP) problem. Simulation results showed that including well-sized energy storage options together with optimal operation management of generating units can improve the economic operation of the test system while...

  7. An Assessment for Emergency Preparedness Plan in Hanul Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Park, Sunghyun; Jae, Moosung [Hanyang University, Seoul (Korea, Republic of)

    2016-10-15

    The purpose of emergency preparedness aims to protect the accident and mitigate the radiation damage of public by setting emergency preparedness plan. In order to perform successfully the emergency preparedness plan, it should be optimized through a quantitative analysis. There are so many variables to analyze it quantitatively. It is mission to classify a realistic and suitable variables among these variables. The realistic variables is converted to the decision node in decision tree which is helpful to decide what evacuation or sheltering is effective to mitigate public damage. Base on it, it's idealistic method to analyze offsite consequences for each end points in the decision tree. In this study, we selected the reference plant which already has the emergency preparedness plan. Among the plan, we implemented offsite consequence analysis for a specific plan by using MACCS 2 code. In this study, target group is people who gathered in place 1 have sheltered and evacuated along the pathway. the offsite consequences analysis result of the group are 1.17·10-9 (early fatality), 1.77·10-7 (late fatality). Various cases need to be quantified for make an optimized decision. In the future, we will perform the verification and modification of decision node. After The assessment of emergency preparedness plan for Hanul nuclear power plant unit 5, 6 might be contribute to establish the optimized decision making of emergency prepared plan.

  8. 77 FR 20807 - Northwest Pipeline GP; Notice of Application

    Science.gov (United States)

    2012-04-06

    ... diameter pipelines away from an adjacent surface coal mine west of Kemmerer, Wyoming. Northwest also... directed to Pam Barnes, Manager Certificates and Tariffs, Northwest Pipeline GP, 295 Chipeta Way, Salt Lake...

  9. 7 CFR 1124.2 - Pacific Northwest marketing area.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Pacific Northwest marketing area. 1124.2 Section 1124.2 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements and Orders; Milk), DEPARTMENT OF AGRICULTURE MILK IN THE PACIFIC NORTHWEST MARKETING AREA Order...

  10. Pacific Northwest Laboratory annual report for 1988 to the Assistant Secretary for Environment, Safety, and Health: Part 5, Environment, safety, health, and quality assurance

    International Nuclear Information System (INIS)

    Faust, L.G.; Pennell, W.T.; Selby, J.M.

    1989-02-01

    This document summarizes the research programs now underway at Battelle's Pacific Northwest Laboratory in the areas of environmental safety, health, and quality assurance. Topics include internal irradiation, emergency plans, dose equivalents, risk assessment, dose equivalents, surveys, neutron dosimetry, and radiation accidents

  11. Experiences and Management of Pregnant Radiation Workers at the Pacific Northwest National Laboratory

    International Nuclear Information System (INIS)

    Bliss, Mary; Bowyer, Sonya M.; Bryant, Janet L.; Lipton, Mary S.; Wahl, Karen L.

    2001-01-01

    Radiation workers at the Pacific Northwest National Laboratory are divided into two classes based on whether or not they can encounter radioactive contamination in the normal course of their work. Level I workers primarily handle sealed radioactive materials such as those used to calibrate detectors. Level II workers perform benchtop chemistry. The U.S. Department of Energy has strict guidelines on the management of pregnant radiation workers. Staff members may voluntarily notify their line managers of a pregnancy and be subjected to stringent radiation exposure limits for the developing fetus. The staff member and manager develop a plan to limit and monitor radiation dose for the remainder of the pregnancy. Several examples of dose management plans and case examples of the impact of pregnancy on staff member's technical work and projects will be presented

  12. Comprehensive Benefit Evaluation of the Power Distribution Network Planning Project Based on Improved IAHP and Multi-Level Extension Assessment Method

    OpenAIRE

    Qunli Wu; Chenyang Peng

    2016-01-01

    Reasonable distribution network planning is an essential prerequisite of the economics and security of the future power grid. The comprehensive benefit evaluation of a distribution network planning project can make significant contributions towards guiding decisions during the planning scheme, the optimization of the distribution network structure, and the rational use of resources. In this paper, in light of the characteristics of the power distribution network, the comprehensive benefit eva...

  13. Electric Power Lines : Questions and Answers on Research into Health Effects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-11-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this pamphlet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. (BPA is the Pacific Northwest`s Federal electric power marketing agency.) First, some basic electrical terms are defined, and electric and magnetic fields are described. Next, answers are given to several questions about recent scientific studies. We then describe how BPA is addressing public concerns raised by these studies. Some important information about electrical safety follows. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this pamphlet.

  14. Kilowatt isotope power system, Phase II Plan. Volume IV. Teledyne FSCD vs GDS

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-15

    This Volume contains Teledyne's input to the Kilowatt Isotope Power System Phase II Plan. Included is a description of the Flight System Heat Generation System, Flight System Radiator, Thermal Insulation Stability, GDS Heat Generation System and GDS Radiator.

  15. Analysis of the security during power system expansion planning

    Directory of Open Access Journals (Sweden)

    Osak Alexey

    2017-01-01

    Full Text Available Increasing the intelligent level of the EPS control systems, caused by the implementation of Smart technologies, changes the structure and the properties of EPS and increases the importance of system reliability analysis. System reliability analysis includes two components – for the balance and for the regime. On the one hand, there is a large number of studies to assess the reliability of the power system, which examines various aspects and methods of solving this problem. On the other hand, in Russia there is no generally accepted methodology with clear criteria that could be used for feasibility studies of various technical solutions taking into consideration system reliability aspects. In practice, the security analysis is limited by the calculations of power flows, static and dynamic stability for a number of forecast periods for the normal and repair circuits considering the most severe disturbances. The existing approach allows defining the requirements and adjusting emergency control systems, but does not allow evaluating and comparing solutions for power grid constructions. The authors propose a new method for power system reliability evaluation, which is suitable for planning development and operation of power systems. The method includes a general description of the algorithm which allows to compare various development scenarios, as well as to assess the reliability level of their implementation. In particular, the method allows to determine where it is needed only the relay protection and emergency control system development, and where it is necessary grid, protection and control development and reconstruction.

  16. Dose rate survey inside and outside three public buildings located approximately 40 km northwest of the Fukushima Daiichi Nuclear Power Stations

    International Nuclear Information System (INIS)

    Yajima, Kazuaki; Iwaoka, Kazuki; Kamada, So

    2013-01-01

    We surveyed the reduction of the dose rate inside three public buildings compared to the dose rate outside in Kawamata-machi, Fukushima Prefecture. The three buildings—a wooden construction district meeting place, a steel construction public hall, and a reinforced concrete school building—are located approximately 40 km northwest of TEPCO's Fukushima Daiichi Nuclear Power Stations. The dose rate measurement, performed with a NaI(Tl) scintillation survey meter, was carried out on January 19, 2012. We evaluated the reduction of the dose rate inside the building using the reduction factor, which was determined to be the ratio of the dose rate inside the building to that outside the building. The reduction factors 1 m inside from the window were 0.51-0.56 for the wooden building, 0.34-0.51 for the steel construction building, and 0.27-0.31 for the concrete building. The reduction factors at the center of the room were 0.48 for the wooden building, 0.23-0.34 for the steel construction building, and 0.10-0.16 for the concrete building. (author)

  17. Multi-objective and multi-criteria optimization for power generation expansion planning with CO2 mitigation in Thailand

    Directory of Open Access Journals (Sweden)

    Kamphol Promjiraprawat

    2013-06-01

    Full Text Available In power generation expansion planning, electric utilities have encountered the major challenge of environmental awareness whilst being concerned with budgetary burdens. The approach for selecting generating technologies should depend on economic and environmental constraint as well as externalities. Thus, the multi-objective optimization becomes a more attractive approach. This paper presents a hybrid framework of multi-objective optimization and multi-criteria decision making to solve power generation expansion planning problems in Thailand. In this paper, CO2 emissions and external cost are modeled as a multi-objective optimization problem. Then the analytic hierarchy process is utilized to determine thecompromised solution. For carbon capture and storage technology, CO2 emissions can be mitigated by 74.7% from the least cost plan and leads to the reduction of the external cost of around 500 billion US dollars over the planning horizon. Results indicate that the proposed approach provides optimum cost-related CO2 mitigation plan as well as external cost.

  18. A basic study for development of environmental standard review plan of Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Chang Hyun; Cho, Jae Seon; You, Young Woo [Seoul Nationl Univ., Seoul (Korea, Republic of)] (and others)

    1999-12-15

    In this study is performed a basic study to be ready for the development and detail analysis of NUREG-1555 ESRP. As a fundamental research for literature survey and development of draft review plan, review and translation of NUREG-1555 published by NRC, and which is applied to licensing procedure of Nuclear Power Plants are included. These provided the basic information for the developments of the environmental standard review plan.

  19. Participation of the ININ in the external radiological emergency plan of the Laguna Verde power plant

    International Nuclear Information System (INIS)

    Martinez S, R.; Cervini L, A.

    1991-01-01

    The planning of performances in radiological emergencies, with the object of reducing the consequences as much as possible on the population to accidental liberations of radioactive material coming from Nuclear power plant, it has been of main interest in the nuclear community in the world. In Mexico it has not been the exception, since with the setting in march of the Laguna Verde nuclear power plant exists an executive program of planning for emergencies that it outlines the activities to follow trending to mitigate the consequences that are derived of this emergency. As integral part of this program this the External Plan of Radiological Emergency (PERE) that covers the emergencies that could leave the frontiers of the Laguna Verde power plant. In the PERE it settles down the planning, address and control of the preparation activities, response and recovery in emergencies, as well as the organization and coordination of the institutions that participate. The National Institute of Nuclear Research (ININ), like integral part of these institutions in the PERE, has an infrastructure that it allows to participate in the plan in a direct way in the activities of 'Control of the radiological exhibition the response personnel and control of water and foods' and of support way and consultant ship in the activities of 'Monitoring, Classification and decontamination of having evaluated' and 'Specialized medical radiological attention'. At the moment the ININ has a radiological mobile unit and this conditioning a second mobile unit to carry out part of the activities before mentioned; also accounts with 48 properly qualified people that directly intervene in the plan. In order to guarantee an adequate response in the PERE an organization it has been structured like that of the annex as for the personnel, transport, team, procedures and communication system, with the objective always of guaranteeing the security and the population's health in emergency situations in the

  20. Pacific Northwest Laboratory annual report for 1988 to the Assistant Secretary for Environment, Safety, and Health: Part 5, Environment, safety, health, and quality assurance

    Energy Technology Data Exchange (ETDEWEB)

    Faust, L.G.; Pennell, W.T.; Selby, J.M.

    1989-02-01

    This document summarizes the research programs now underway at Battelle's Pacific Northwest Laboratory in the areas of environmental safety, health, and quality assurance. Topics include internal irradiation, emergency plans, dose equivalents, risk assessment, dose equivalents, surveys, neutron dosimetry, and radiation accidents. (TEM)

  1. Medical emergency planning in case of severe nuclear power plant accidents

    International Nuclear Information System (INIS)

    Ohlenschlaeger, L.

    1980-01-01

    This paper is an attempt to discuss a three-step-plan on medical emergency planning in case of severe accidents at nuclear power plants on the basis of own experiences in the regional area as well as on the basis of recommendations of the Federal Minister of the Interior. The medical considerations take account of the severity and extension of an accident whereby the current definitions used in nuclear engineering for accident situations are taken as basis. A comparison between obligatory and actual state is made on the possibilities of medical emergency planning, taking all capacities of staff, facilities, and equipment available in the Federal Republic of Germany into account. To assure a useful and quick utilization of the existing infra-structure as well as nation-wide uniform training of physicians and medical assistants in the field of medical emergency in case of a nuclear catastrophe, a federal law for health protection is regarded urgently necessary. (orig.) [de

  2. Using the ENPEP program for nuclear power planning study in Vietnam

    International Nuclear Information System (INIS)

    Le Van Hong; Hamilton, B.; Conzelmann, G.; Phung Manh Duc

    2000-01-01

    In the framework of national R-D project KH-09-04 ''Establishment the fundamental basic for the introduction of nuclear power into Vietnam'', 1996-1998, and Technical cooperation project VIE/0/009 ''Prefeasibility study for the introduction of nuclear power plant into Vietnam'', 1997-1999, planning study of energy and nuclear power has been conducted. Based on 3 scenarios (high, based and low) of the Vietnam socio-economic development up to year 2020, the energy demand (forecasting was carried out using computer model MAED. The electricity demand forecast obtained from the MAED is used as one of the basic inputs to the optimization study of the electricity generating sector using the WASP model. In view of the limited, energy supplies form indigenous resources, it has been assumed that imported coal and nuclear power will be considered as the future energy supply options. From the results of optimal electric system expansion found in the study, it can be concluded that nuclear power should be added to the system from 2016 to 2020 depends on national economic development and availability of domestic natural gas sully (author)

  3. Combined Heat and Power (CHP) as a Compliance Option under the Clean Power Plan: A Template and Policy Options for State Regulators

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-07-30

    Combined Heat and Power (CHP) is an important option for states to consider in developing strategies to meet their emission targets under the US Environmental Protection Agency's Clean Power Plan. This Template is designed to highlight key issues that states should consider when evaluating whether CHP could be a meaningful component of their compliance plans. It demonstrates that CHP can be a valuable approach for reducing emissions and helping states achieve their targets. While the report does not endorse any particular approach for any state, and actual plans will vary dependent upon state-specific factors and determinations, it provides tools and resources that states can use to begin the process, and underscores the opportunity CHP represents for many states. . By producing both heat and electricity from a single fuel source, CHP offers significant energy savings and carbon emissions benefits over the separate generation of heat and power, with a typical unit producing electricity with half the emissions of conventional generation. These efficiency gains translate to economic savings and enhanced competitiveness for CHP hosts, and emissions reductions for the state, along with helping to lower electric bills; and creating jobs in the design, construction, installation and maintenance of equipment. In 2015, CHP represents 8 percent of electric capacity in the United States and provides 12 percent of total power generation. Projects already exist in all 50 states, but significant technical and economic potential remains. CHP offers a tested way for states to achieve their emission limits while advancing a host of ancillary benefits.

  4. The density management and riparian buffer study: a large-scale silviculture experiment informing riparian management in the Pacific Northwest, USA

    Science.gov (United States)

    Paul D. Anderson; Nathan J. Poage

    2014-01-01

    The advent of the Northwest Forest Plan (NWFP) in the early 1990s signaled a new paradigm for management of 9.9 million ha of federal forest lands in western Washington and Oregon, USA. The emphasis shifted from commodity timber production to ensuring sustained ecological functioning to meet a broad array of ecosystem services including economic benefits. Under interim...

  5. The power industry of the Magadan oblast: part of the Leninist GOELRO (State Commission for the Electrification of Russia) plan

    Energy Technology Data Exchange (ETDEWEB)

    Pozdnyak, I.G.; Anishchenko, Ye.B.

    1981-01-01

    A brief history is given of the development of the Magadan oblast's power industry, which is inseparably connected with development of the very rich raw material resources and fast development of the mining industry. In 1985 completion of construction of the Kolyma GES is planned; with the end of its construction will begin preparatory work one Ust'-Srednekansk GES: the second GES of the Kalyma falls. Work has begun since 1981 to expand the third phase of the Magadan heat and electric power plant. In 1982 completion of installation of power equipment at the Arkagalinsk State regional power plant is planned. In the 11th five-year plan construction of the system of 220 kV power lines will be finished, and 110 and 35 kV power distribution lines will be built. A special place belongs to construction of the Lankovskaya thermal power plant, which will aid in creating a stable fuel-energy base with a positive future. Chukotka power will be further developed. By 1990, 18 more state farms should be connected to the state power system. Completing the power basis in the Magadan oblast will enable an acceleration in its development, and a rise in the material and cultural standard of living of the people of the Far Northeast.

  6. Compression planning for continuous improvement in quality programs

    International Nuclear Information System (INIS)

    Willis, Y.A.; Hood, F.C.

    1992-01-01

    This paper describes Compression Planning, an innovative approach for planning in groups. This participative and structured approach is especially suitable for technical and highly regulated organizations. Compression Planning was applied to the first organization-wide effort at training integration for regulatory compliance, at Battelle Pacific Northwest Laboratory (PNL), a multi-program national laboratory. The planning process was judged as measurably superior to PNL's customary planning. Within 10 days a training policy was issued and an action plan drafted. The participants produced a report identifying and prioritizing 33 key training issues; began to data gather and solicit input from personnel Lab-wide, producing a 2-volume training inventory; and formulated 14 recommendations for implementation. Two years later the plan is still evolving, as PNL training continues to develop, consistent with Continuous Improvement Process objectives

  7. Hungry Horse Mitigation Plan; Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam, 1990-2003 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fraley, John J.; Marotz, Brian L. (Montana Department of Fish, Wildlife and Parks, Helena, MT); DosSantos, Joseph M. (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

    2003-04-01

    In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is one of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and

  8. The Norwegian Plan of Action for nuclear safety issues

    International Nuclear Information System (INIS)

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects

  9. The Norwegian Plan of Action for nuclear safety issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The Plan of Action underlies Norwegian activities in the field of international co-operation to enhance nuclear safety and prevent radioactive contamination from activities in Eastern Europe and the former Soviet Union. Geographically the highest priority has been given to support for safety measures in north-west Russia. This information brochure outlines the main content of the Plan of Action for nuclear safety issues and lists a number of associated measures and projects.

  10. New aspects in the radiological emergency plan outside the Nuclear power plant of Laguna Verde

    International Nuclear Information System (INIS)

    Alva L, S.

    1991-01-01

    The Mexican government through the National Commission of Nuclear Safety and Safeguards has imposed to the Federal Commission of Electricity to fulfill the requirement of having a functional Emergency Plan and under the limits that the regulator organisms in the world have proposed. The PERE (Plan of External Radiological Emergency) it has been created for the Nuclear Power station of Laguna Verde, Mexico

  11. Public participation in town-planning applications: Tlokwe Local ...

    African Journals Online (AJOL)

    Ms Karen Puren, Senior Lecturer, Subject Group Urban and Regional Planning, School for Geo and Spatial Sciences, North-West University. (Potchefstroom Campus), Private ..... of the 1960s in Europe, Australia and the. United States, and the 1970s ..... expected increase in crime in the area, segregation of the community, ...

  12. Modeling and forecasting of electrical power demands for capacity planning

    Energy Technology Data Exchange (ETDEWEB)

    Al-Shobaki, Salman [Department of Industrial Engineering, Hashemite University, Zarka 13115 (Jordan); Mohsen, Mousa [Department of Mechanical Engineering, Hashemite University, Zarka 13115 (Jordan)

    2008-11-15

    This paper describes the development of forecasting models to predict future generation and electrical power consumption in Jordan. This is critical to production cost since power is generated by burning expensive imported oil. Currently, the National Electric Power Company (NEPCO) is using regression models that only accounts for trend dynamics in their planning of loads and demand levels. The models are simplistic and are based on generated energy historical levels. They produce results on yearly bases and do not account for monthly variability in demand levels. The paper presents two models, one based on the generated energy data and the other is based on the consumed energy data. The models account for trend, monthly seasonality, and cycle dynamics. Both models are compared to NEPCO's model and indicate that NEPCO is producing energy at levels higher than needed (5.25%) thus increasing the loss in generated energy. The developed models also show a 13% difference between the generated energy and the consumed energy that is lost due to transmission line and in-house consumption. (author)

  13. Modeling and forecasting of electrical power demands for capacity planning

    International Nuclear Information System (INIS)

    Al-Shobaki, Salman; Mohsen, Mousa

    2008-01-01

    This paper describes the development of forecasting models to predict future generation and electrical power consumption in Jordan. This is critical to production cost since power is generated by burning expensive imported oil. Currently, the National Electric Power Company (NEPCO) is using regression models that only accounts for trend dynamics in their planning of loads and demand levels. The models are simplistic and are based on generated energy historical levels. They produce results on yearly bases and do not account for monthly variability in demand levels. The paper presents two models, one based on the generated energy data and the other is based on the consumed energy data. The models account for trend, monthly seasonality, and cycle dynamics. Both models are compared to NEPCO's model and indicate that NEPCO is producing energy at levels higher than needed (5.25%) thus increasing the loss in generated energy. The developed models also show a 13% difference between the generated energy and the consumed energy that is lost due to transmission line and in-house consumption

  14. Radiological mapping of emergency planning zone of Narora Atomic Power Station

    International Nuclear Information System (INIS)

    Pujari, R.N.; Saindane, Shashank; Narsaiah, M.V.R.; Solase, S.S.; Chaudbury, Probal; Kumar, Deepak; Gautam, Y.P.; Sharma, A.K.; Kumar, Avinash

    2016-01-01

    As a part of emergency preparedness programme, environmental radiation monitoring of Emergency Planning Zone (EPZ) (16 km radius) of Nuclear Power Plants (NPPs) is being carried out periodically. An environmental radiation monitoring of EPZ of Narora Atomic Power Station (NAPS) was carried out by installing various state-of-the-art mobile radiation monitoring systems in a vehicle and soil samples were collected from 40 locations. Around 200 important villages within EPZ were monitored and the radiological mapping of the monitored area is shown. The average dose rate recorded was 125 ± 28.8 nGy h -1 . Analysis of the collected dose rate data and the soil samples indicate normal background radiation level in the area

  15. Criteria for preparation and evaluation of radiological emergency response plans and preparedness in support of nuclear power plants: Criteria for utility offsite planning and preparedness: Final report

    International Nuclear Information System (INIS)

    Podolak, E.M. Jr.; Sanders, M.E.; Wingert, V.L.; Donovan, R.W.

    1988-09-01

    The Nuclear Regulatory Commission (NRC) and the Federal Emergency Management Agency (FEMA) have added a supplement to NUREG-0654/FEMA-REP-1, Rev. 1 that provides guidance for the development, review, and evaluation of utility offsite radiological emergency response planning and preparedness for those situations in which state and/or local governments decline to participate in emergency planning. While this guidance primarily applies to plants that do not have full-power operating licenses, it does have relevance to operating nuclear power plants

  16. New Whole-House Solutions Case Study: Northwest Energy Efficient Manufactured Housing Program High-Performance Test Homes - Pacific Northwest

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-05-01

    This project represents the third phase of a multi-year effort to develop and bring to market a High Performance Manufactured Home (HPMH). In this project, the Northwest Energy Efficient Manufactured Housing Program worked with Building America Partnership for Improved Residential Construction and Bonneville Power Administration to help four factory homebuilders build prototype zero energy ready manufactured homes, resulting in what is expected to be a 30% savings relative to the Building America Benchmark. (The actual % savings varies depending on choice of heating equipment and climate zone). Previous phases of this project created a HPMH specification and prototyped individual measures from the package to obtain engineering approvals and develop preliminary factory construction processes. This case study describes the project team's work during 2014 to build prototype homes to the HPMH specifications and to monitor the homes for energy performance and durability. Monitoring is expected to continue into 2016.

  17. An investigation on technical bases of emergency plan zone determination of Qinshan Nuclear Power Base

    International Nuclear Information System (INIS)

    Duan Xuyi

    2000-01-01

    According to the general principal and the basic method of determination of emergency zone and safety criteria and in the light of the environmental and accidental release characteristic of Qinshan Nuclear Power Base, the expectation dose of assumed accident of each plant was compared and analyzed. In consideration of the impact factor of the size of emergency plan zone and referring to the information of emergency plan zone determination of other country in the world, the suggestions of determination method of emergency plan zone are proposed

  18. Offshore wind power - Possibilities and shortcomings in the planning and design; Vindkraft till havs - Moejligheter och brister vid planering och projektering

    Energy Technology Data Exchange (ETDEWEB)

    Andre, Daniel

    2010-02-15

    The purpose of this report is to examine how the planning preparedness offshore unfolds. Planning conditions of municipalities have been investigated through interviews with municipal planners and representatives of the wind power stakeholders. At the same time, the problems and deficiencies that impede the expansion of offshore wind power have been identified. In the report, based on the survey of the state of planning, as well as the shortcomings of current systems, the Swedish National Board of Housing, Building and Planning presents opportunities for improvements. With these proposals the Swedish National Board of Housing, Building and Planning opens up for an increased cooperation with the aim to facilitate a future expansion of offshore wind power. The report primarily addresses central government agencies and authorities, county councils, as well as planners or other officers of the national, regional and municipal levels

  19. Hogged wood fuel price analysis in the U.S. Pacific Northwest

    International Nuclear Information System (INIS)

    Biederman, R.T.; Blazek, C.F.; Fox, P.J.

    1991-01-01

    The purpose of this paper is to discuss the results of a comprehensive analysis of wood residues used for meeting energy requirements in the Pacific Northwest region of the United States. These wood residues are generated primarily from cutting, sawing, planning, sanding, and debarking activities in the lumber and plywood industries. While high-quality wood residues are commonly used as raw material in the manufacture of pulp and board commodities, a very large amount of wood residues are ultimately used for plant fuel purposes. The characteristics of this market for hogged wood fuel are examined in depth, with particular emphasis given to the factors which affect the supply, demand and price of hogged wood. Hogged wood has played an enormous role in the Pacific Northwest for over sixty years, a result of the massive regional timber harvest. Utilization of this renewable energy resource continues to be a large component in regional energy supply. Despite having a large number of highly integrated mills that both use and produce wood residues, the Pacific Northwest region experiences a lively trade in hogged wood. The IGT study discussed herein examines the determinants of the regional market price for hogged wood. A number of useful leading indicators are identified, and a statistical forecasting model is prepared to help predict future hogged wood prices. This model provides insight into the factors that are, and are not, important determinants of hogged wood price. The issue of fuel substitution is addressed in relation to the potential of hogged wood to displace some amount of primary energy sources such as natural gas and electricity. Also examined in the study are techniques to estimate the actual quantity of hogged wood available, and the quantity demanded by the marketplace. Conclusions presented in the study have important ramifications for understanding the price behavior and utilization of hogged wood fuel. 4 refs., 12 figs

  20. Wien Automatic System Planning (WASP) Package. A computer code for power generating system expansion planning. Version WASP-IV. User's manual

    International Nuclear Information System (INIS)

    2001-01-01

    As a continuation of its efforts to provide methodologies and tools to Member States to carry out comparative assessment and analyse priority environmental issues related to the development of the electric power sector, the IAEA has completed a new version of the Wien Automatic System Planning (WASP) Package WASP-IV for carrying out power generation expansion planning taking into consideration fuel availability and environmental constraints. This manual constitutes a part of this work and aims to provide users with a guide to use effectively the new version of the model WASP-IV. WASP was originally developed in 1972 by the Tennessee Valley Authority and the Oak Ridge National Laboratory in the USA to meet the IAEA needs to analyse the economic competitiveness of nuclear power in comparison to other generation expansion alternatives for supplying the future electricity requirements of a country or region. Previous versions of the model were used by Member States in many national and regional studies to analyse the electric power system expansion planning and the role of nuclear energy in particular. Experience gained from its application allowed development of WASP into a very comprehensive planning tool for electric power system expansion analysis. New, improved versions were developed, which took into consideration the needs expressed by the users of the programme in order to address important emerging issues being faced by the electric system planners. In 1979, WASP-IV was released and soon after became an indispensable tool in many Member States for generation expansion planning. The WASP-IV version was continually upgraded and the development of version WASP-III Plus commenced in 1992. By 1995, WASP-III Plus was completed, which followed closely the methodology of the WASP-III but incorporated new features. In order to meet the needs of electricity planners and following the recommendations of the Helsinki symposium, development of a new version of WASP was

  1. SVC Planning in Large–scale Power Systems via a Hybrid Optimization Method

    DEFF Research Database (Denmark)

    Yang, Guang ya; Majumder, Rajat; Xu, Zhao

    2009-01-01

    The research on allocation of FACTS devices has attracted quite a lot interests from various aspects. In this paper, a hybrid model is proposed to optimise the number, location as well as the parameter settings of static Var compensator (SVC) deployed in large–scale power systems. The model...... utilises the result of vulnerability assessment for determining the candidate locations. A hybrid optimisation method including two stages is proposed to find out the optimal solution of SVC in large– scale planning problem. In the first stage, a conventional genetic algorithm (GA) is exploited to generate...... a candidate solution pool. Then in the second stage, the candidates are presented to a linear planning model to investigate the system optimal loadability, hence the optimal solution for SVC planning can be achieved. The method is presented to IEEE 300–bus system....

  2. Particular intervention plan of the Civaux Nuclear Power Plant. Public version. Special provision of the organisation plan for civil protection response

    International Nuclear Information System (INIS)

    2016-04-01

    The Particular intervention plan (PPI in French) is an emergency plan which foresees the measures and means to be implemented to address the potential risks of the presence and operation of a nuclear facility. This plan is implemented and developed by the Prefect in case of nuclear accident (or incident leading to a potential accident), the impact of which extending beyond the facility perimeter. It represents a special section of the organisation plan for civil protection response (ORSEC plan). The PPI foresees the necessary measures and means for crisis management during the first hours following the accident and is triggered by the Department Prefect according to the information provided by the facility operator. Its aim is to protect the populations leaving within 10 km of the facility against a potential radiological hazard. The PPI describes: the facility, the intervention area, the protection measures for the population, the conditions of emergency plan triggering, the crisis organisation, the action forms of the different services, and the post-accident stage. This document is the public version of the Particular intervention plan of the Civaux nuclear power plant (Vienne, France)

  3. Launching and implementing FEMP`s 1997 outreach plan featuring the ``You Have the Power`` campaign

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    The Federal Energy Management Program`s (FEMP`s) mission is to help Federal agencies reduce energy costs by delivering effective technology transfer and outreach programs. It is important that FEMP provide leadership and good examples to the Federal sector so that FEMP`s programs and priorities can be transferred throughout Federal agencies and offices across the Nation. In order to achieve this mission, FEMP must send a clear message to everyone involved with the management of Federal facilities concerning its available resources, effective information and assistance, educational programs, tools, and training. To achieve this objective, American Ideas and Designs, Inc., d/b/a Greening America (hereinafter referred to as Recipient) has assisted FEMP in developing a comprehensive energy efficiency technology transfer program plan (hereinafter referred to as the outreach plan). A key component of the outreach plan involved the development and launch of a technology transfer campaign entitled ``You Have the Power.`` The outreach plan and the ``You Have the Power`` campaign emphasized the ability of individual Federal employees, Federal agencies, and stakeholder organizations to easily access FEMP`s energy efficiency tools and resources through a set of integrated interagency delivery programs.

  4. Opportunity study and a business plan for a wind power plant

    International Nuclear Information System (INIS)

    Nikolov, Marjan; Naumov, Risto

    2006-01-01

    This paper provides illustration of opportunity study and a business plan for utilizing the wind renewable resource for electricity production in Macedonia. The study is prepared under UNIDO recommendations for feasibility studies (see [1]) and following the IAS, by Marjan Nikolov and Risto Naumov. This is a project simulation for a small wind farm comprising 3 power plant units. We use price list from 'Proven Engineering Products Ltd' UK.

  5. Strategic Sustainability Performance Plan. Discovering Sustainable Solutions to Power and Secure America’s Future

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2010-09-01

    Sustainability is fundamental to the Department of Energy’s research mission and operations as reflected in the Department’s Strategic Plan. Our overarching mission is to discover the solutions to power and secure America’s future.

  6. Wildlife Protection, Mitigation and Enhancement Planning for Grand Coulee Dam, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Creveling, Jennifer

    1986-08-01

    The development and operation of Grand Coulee Dam inundated approximately 70,000 acres of wildlife habitat under the jurisdictions of the Colville Confederated Tribes, the Spokane Tribe, and the State of Washington. Under the provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, this study reviews losses to wildlife and habitat, and proposes mitigation for those losses. Wildlife loss estimates were developed from information available in the literature. Habitat losses and potential habitat gains through mitigation were estimated by a modified Habitat Evaluation Procedure. The mitigation plan proposes (1) acquisition of sufficient land or management rights to land to protect Habitat Units equivalent to those lost (approximately 73,000 acres of land would be required), (2) improvement and management of those lands to obtain and perpetuate target Habitat Units, and (3) protection and enhancement of suitable habitat for bald eagles. Mitigation is presented as four actions to be implemented over a 10-year period. A monitoring program is proposed to monitor mitigation success in terms of Habitat Units and wildlife population trends.

  7. Recent development of methods of long-term planning in the power economy of the GDR and trends of their future application

    International Nuclear Information System (INIS)

    Bathe, J.; Hedrich, P.

    1980-01-01

    Due to the rapid development of the power economy, the procedures of long-term planning and the necessary methods, calculation techniques and models need permanent scientific treatment. The prerequisites for the development and utilization of mathematical methods in long- and medium-term planning of power economy are characterized. The steps of development up to the establishment and utilization of a central optimization model that can be coupled and interlaced with the complex of optimization algorithms in partial fields of power economy are presented. Problems of further improvement and more effective utilization of mathematical means of planning are discussed, considering the growing interlacing of power economy decisions with those in other branches and fields of national economy. Hence, requirements of enhanced optimization of the power economy development in enlarged balance pools and for longer periods are derived. (author)

  8. Northwest Africa 8535 and Northwest Africa 10463: New Insights into the Angrite Parent Body

    Science.gov (United States)

    Santos, A. R.; Agee, C. B.; Shearer, C. K.; McCubbin, F. M.

    2016-01-01

    The angrite meteorites are valuable samples of igneous rocks formed early in Solar System history (approx.4.56 Ga, summarized in [1]). This small meteorite group (approx.24 individually named specimens) consists of rocks with somewhat exotic mineral compositions (e.g., high Ca olivine, Al-Ti-bearing diopside-hedenbergite, calcium silico-phosphates), resulting in exotic bulk rock compositions. These mineral assemblages remain fairly consistent among angrite samples, which suggests they formed due to similar processes from a single mantle source. There is still debate over the formation process for these rocks (see summary in [1]), and analysis of additional angrite samples may help to address this debate. Toward this end, we have begun to study two new angrites, Northwest Africa 8535, a dunite, and Northwest Africa 10463, a basaltic angrite.

  9. Streamnet; Northwest Aquatic Information Network, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, Bruce (Pacific States Marine Fisheries Commission, Gladstone, OR)

    2003-02-07

    A primary focus of the StreamNet project in FY-02 was maintenance and update of ongoing data types. Significant progress was made toward updating data for the primary data categories in the StreamNet regional database. Data updates had been slowed in previous years due to the time required for conversion of georeferencing for most data types from the 1:250,000 scale River Reach Number (RRN) system to the 1:100,000 Longitude-Latitude Identifier (LLID) system. In addition, data relating to Protected Areas and Smolt Density Model results, the last data sets in the StreamNet database still in the 1:250,000 RRN format, were converted this year to the LLID system, making them available through the on-line Web Query System. The Protected Areas data were also made available through an on-line interactive mapping application. All routine project activities continued, including project administration at the full project and cooperating project levels, project management through the StreamNet Steering Committee, maintenance of databases and Internet data delivery systems, and providing data related services to the Northwest Power Planning Council's (NWPPC) Fish and Wildlife Program. As part of system management, a new web server was put in operation, significantly improving speed and reliability of Internet data delivery. The web based data query system was modified to utilize ColdFusion, in preparation for a full conversion to ColdFusion from the custom programming in Delphi. This greatly increased flexibility and the ability to modify query system function, correct errors, and develop new query capabilities. All project participants responded to numerous requests for information (data, maps, technical assistance, etc.) throughout the year. A significant accomplishment this year was resolution of long standing differences in how fish distribution is defined and presented. By focusing strictly on definitions related to current distribution (ignoring potential and

  10. A multiple objective mixed integer linear programming model for power generation expansion planning

    Energy Technology Data Exchange (ETDEWEB)

    Antunes, C. Henggeler; Martins, A. Gomes [INESC-Coimbra, Coimbra (Portugal); Universidade de Coimbra, Dept. de Engenharia Electrotecnica, Coimbra (Portugal); Brito, Isabel Sofia [Instituto Politecnico de Beja, Escola Superior de Tecnologia e Gestao, Beja (Portugal)

    2004-03-01

    Power generation expansion planning inherently involves multiple, conflicting and incommensurate objectives. Therefore, mathematical models become more realistic if distinct evaluation aspects, such as cost and environmental concerns, are explicitly considered as objective functions rather than being encompassed by a single economic indicator. With the aid of multiple objective models, decision makers may grasp the conflicting nature and the trade-offs among the different objectives in order to select satisfactory compromise solutions. This paper presents a multiple objective mixed integer linear programming model for power generation expansion planning that allows the consideration of modular expansion capacity values of supply-side options. This characteristic of the model avoids the well-known problem associated with continuous capacity values that usually have to be discretized in a post-processing phase without feedback on the nature and importance of the changes in the attributes of the obtained solutions. Demand-side management (DSM) is also considered an option in the planning process, assuming there is a sufficiently large portion of the market under franchise conditions. As DSM full costs are accounted in the model, including lost revenues, it is possible to perform an evaluation of the rate impact in order to further inform the decision process (Author)

  11. Investigation of wind power potential at Oran, northwest of Algeria

    International Nuclear Information System (INIS)

    Boudia, Sidi Mohammed; Guerri, Ouahiba

    2015-01-01

    Highlights: • Wind resource assessment in the northwestern part of Algeria using WAsP Software. • Comparison between the performances of 6 WECs at 3 sites with great potential. • Assessment of the wind power cost per kW h of electricity produced. • Stall-regulated wind turbines are more appropriated for Site 1. • Pitch-regulated wind turbines are suggested for the windiest Site. - Abstract: In this work, ten years of wind data from Oran meteorological station have been used to evaluate the potential of wind power on the Oranie region, in the North-western part of Algeria, open on the Mediterranean Sea. The WAsP program was used to analyze the wind Atlas of the region to find the windiest areas. Three regions were chosen for their great wind potential. The study proposes to assess wind power cost per kW h of electricity produced using six types of WECs. The investigation at 10 m above ground at the location of the meteorological station shows that Oran has an average wind potential, with an annual mean wind speed equal to 4.2 m/s and an annual mean power density of 129 W/m 2 . The temporal study shows that spring period is the windiest with 4.9 m/s. In terms of energy production, the results show that the second site is the best location for harnessing the wind power to generate electricity. The minimum cost per kW h of electricity generated in that location is about 0.0181$/kW h with a capacity factor equal to 51.36% for an annual energy production equal to 11.14 GW h, given by the Power Wind 90 wind turbine of 2.5 MW power rated capacity.

  12. Revision of the basic plans of the first nuclear-powered ship development

    International Nuclear Information System (INIS)

    1978-01-01

    Along with the law for Japan Nuclear Ship Development Agency, the basic plans of development of the first nuclear-powered ship have been revised. After explaining the basic policy concerning the matter, the development program is described as follows: ship type/kind, nuclear power plant, construction, training of ship crew, experimental voyage, compilation of the development results, and works after the experimental voyage. The first nuclear-powered ship of about 8,000 tons gross tonnage, 10,000 horsepower main engine output, and about 16 knots, sea speed will be the ship for special cargo transport and crew training. A pressurized water reactor is used for the power plant. Following the repair of shielding and the overall inspection of safety, the ship is to be completed as early as possible. After completion of the ship, its experimental voyage will be carried out, aiming at the aspects of operational familiarization, ship performance, reliability, port call experience, etc. (Mori, K

  13. A pilot application of risk-based methods to establish in-service inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station

    International Nuclear Information System (INIS)

    Vo, T.; Gore, B.; Simonen, F.; Doctor, S.

    1994-08-01

    As part of the Nondestructive Evaluation Reliability Program sponsored by the US Nuclear Regulatory Commission, the Pacific Northwest Laboratory is developing a method that uses risk-based approaches to establish in-service inspection plans for nuclear power plant components. This method uses probabilistic risk assessment (PRA) results and Failure Modes and Effects Analysis (FEMA) techniques to identify and prioritize the most risk-important systems and components for inspection. The Surry Nuclear Power Station Unit 1 was selected for pilot applications of this method. The specific systems addressed in this report are the reactor pressure vessel, the reactor coolant, the low-pressure injection, and the auxiliary feedwater. The results provide a risk-based ranking of components within these systems and relate the target risk to target failure probability values for individual components. These results will be used to guide the development of improved inspection plans for nuclear power plants. To develop inspection plans, the acceptable level of risk from structural failure for important systems and components will be apportioned as a small fraction (i.e., 5%) of the total PRA-estimated risk for core damage. This process will determine target (acceptable) risk and target failure probability values for individual components. Inspection requirements will be set at levels to assure that acceptable failure probabilistics are maintained

  14. Application of reliability worth concepts in power system operational planning

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Silva, A.M. Leite da [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Pereira, M V.F. [Power System Research (PSR), Inc., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This work describes the application of a new methodology for calculating total system interruption costs in power system operational planning. Some important operational aspects are discussed: chronological load curves, customer damage functions for each consumer class, maintenance scheduling and non-exponential repair times. It is also presented the calculation of the probability distribution of the system interruption cost to improve the decision making process associated with alternative operational strategies. The Brazilian Southeastern system is used to illustrate all previous applications. (author) 24 refs., 8 figs., 4 tabs.

  15. Shippingport Atomic Power Station Operating Experience, Developments and Future Plans

    International Nuclear Information System (INIS)

    Feinroth, H.; Oldham, G.M.; Stiefel, J.T.

    1963-01-01

    This paper describes and evaluates five years of operation and test of the Shippingport Atomic Power Station and discusses the current technical developments and future plans of the Shippingport programme. This programme is directed towards development of the basic technology of light-water reactors to provide the basis for potential reduction in the costs of nuclear power. The Shippingport reactor plant has operated for over five years and has been found to integrate readily into a utility system either as a base load or peak load unit. Plant component performance has been reliable. There have been no problems in contamination or waste disposal. Access to primary coolant components for maintenance has been good, demonstrating the integrity of fuel elements. Each of the three refuelling operations performed since start-up of Shippingport has required successively less time to accomplish. Recently, the third seed was refuelled in 32 working days, about one quarter the time required for the first refuelling. The formal requirements of personnel training, written administrative procedures, power plant manuals, etc., which have been a vital factor in the successful implementation of the Shippingport programme, are described. The results obtained from the comprehensive test programme carried out at Shippingport are compared with calculations, and good agreement has been obtained. Reactor core performance, plant stability, and response to load changes, fuel element and control rod performance, long-term effects such as corrosion and radiation level build-up, component performance, etc., are discussed in this paper. The principal objective of the current and future programmes of the Shippingport Project in advancing the basic technology of water-cooled reactors is discussed. This programme includes the continued operation of the Shippingport plant, and the development, design, manufacture and test operation of a long-life, highpower density second core - Core 2. At its

  16. An Economic Evaluation on Replacement Plan for Aged Thermal Power Plants through a Real Option Approach

    Science.gov (United States)

    Kato, Moritoshi; Zhou, Yicheng

    This paper presents a novel method to evaluate replacement plan for aged thermal power plants under uncertain circumstances through a real option approach. The most economical plan is selected among the three options: an option to operate an existing oil-fired thermal plant, an option to mothball it, and an option to abandon it and to construct an advanced gas combined cycle power plant (ACC) at the same time. Basic ideas of our model are: we use quadranomial approach in order to evaluate an option value consisted by two different uncertain assets; we consider cash flow with a dividend in order to reflect conditions of an aged oil-fired thermal plant and use the sequential compound option approach; we evaluate replacement time using quadranomial decision tree taking into account the options. We also analyze value and time of replacement using numerical examples. Our proposed method will be practically used for generation planning. For example it is possible to make priority quantitatively in replacements of aged thermal power plants by real option values. The target year of replacement may be set as a year when cumulative probability of replacement becomes over certain level.

  17. Environmental assessment and planning theory: four short stories about power, multiple rationality, and ethics

    International Nuclear Information System (INIS)

    Richardson, Tim

    2005-01-01

    This paper engages with recent debates in the environmental assessment (EA) literature about the lessons that can be learned from planning theory. It argues that the current communicative turn in EA, echoing a similar shift in planning thought in the 1990s, has failed to benefit from this earlier experience. Instead of following this trend, the paper examines EA from a perspective which is more closely aligned with some of the critics of the communicative approach, and which combines concepts of power, rationality, value and ethics in a different way. First, the paper briefly sets out how planning theory has engaged with these concepts. It then argues that EA needs to engage with competing multiple rationalities, and the inescapable presence of value conflicts within EA. It then turns to recent debates in EA to show how the question of value has become a very difficult issue for EA theorists. These issues are then explored by looking at four cases where environmental impact assessment (EIA) and strategic environmental assessment (SEA) become dramatic sites of struggle, in very different ways: where the boundaries between facts, boundaries, and opinions are defined through power struggles; where SEA is used as a process of brokerage between a fragile coalition of interests; where power defines rationality in the construction of an SEA instrument; and where EIA is challenged from the outside by civil society. The paper closes by discussing how EA practitioners can operate reflexively and ethically in a world of contested rationality

  18. Planning experience and prospects of local participation in implementation of nuclear power in Bangladesh

    International Nuclear Information System (INIS)

    Rahman, M.A.; Islam, A.B.M.N.; Quaiyum, M.A.; Hasnat, K.A.; Hossain, M.

    1983-01-01

    The paper summarizes the overall experience of Bangladesh in planning for the introduction of its nuclear power programme. The basis for selection of the type of contract for the first nuclear power project of the country is explained. The paper then analyses the prospect of local participation in the construction of the first nuclear power station by detailing the local capabilities in fields such as civil works, civil works materials supply, electrical/mechanical supplies, mechanical fabrication/erection, transportation, etc. After analysing the domestic infrastructure, the problem areas are identified and measures necessary to improve the degree of local participation are described. (author)

  19. Married women's decision making power on family planning use and associated factors in Mizan-Aman, South Ethiopia: a cross sectional study.

    Science.gov (United States)

    Belay, Abeba Daniel; Mengesha, Zelalem Birhanu; Woldegebriel, Manay Kifle; Gelaw, Yalemzewod Assefa

    2016-03-08

    Women's use of family planning service is influenced by many factors, especially by their decision making power. A woman's decision-making power, be it individual or decision made in collaboration with a partner, is the most important factor in the use of family planning in a household. The purpose of this study was to assess the impact of women's decision making power on family planning use and its associated factors. A community-based cross-sectional study was conducted on married women in the child bearing age. The women who were living in Mizan city were selected using the simple random sampling method. Trained nurses collected the data by interview, using a structured and pre-tested questioner. Bivariable and multivariable binary logistic regression analysis was used to identify the associated factors, and the odds ratio with a 95% CI was computed to assess the strength of the association. Collinearity was also assessed by looking at standard errors in the final fitted model. Overall, more than two-thirds [67.2%: 95% CI (63-71%)] of the married women were found to be more autonomous to decide family planning use. Secondary education [AOR: 9.04, 95% CI: (4.50, 18.16)], government employment [AOR: 4.84, 95% CI: (2.03, 11.52)], being wives of government employed spouses [AOR 2.71, 95% CI: (1.24, 7.97)], having husbands with college or university education [AOR: 11.29, 95% CI: (4.66, 27.35)], and being in the younger age [AOR: 0.27, 95% CI :(0.09, 0.75)] were significantly associated with women's decision-making power on family planning. In this study, women had a high decision making power in family planning use. Age category (34-44-years), formal education, and occupational status had effects on women's decision making power. Promoting parental adult education and engaging women in out of house employment is essential to improve their decision making power in using family planning.

  20. Generation Expansion Planning With Large Amounts of Wind Power via Decision-Dependent Stochastic Programming

    Energy Technology Data Exchange (ETDEWEB)

    Zhan, Yiduo; Zheng, Qipeng P.; Wang, Jianhui; Pinson, Pierre

    2017-07-01

    Power generation expansion planning needs to deal with future uncertainties carefully, given that the invested generation assets will be in operation for a long time. Many stochastic programming models have been proposed to tackle this challenge. However, most previous works assume predetermined future uncertainties (i.e., fixed random outcomes with given probabilities). In several recent studies of generation assets' planning (e.g., thermal versus renewable), new findings show that the investment decisions could affect the future uncertainties as well. To this end, this paper proposes a multistage decision-dependent stochastic optimization model for long-term large-scale generation expansion planning, where large amounts of wind power are involved. In the decision-dependent model, the future uncertainties are not only affecting but also affected by the current decisions. In particular, the probability distribution function is determined by not only input parameters but also decision variables. To deal with the nonlinear constraints in our model, a quasi-exact solution approach is then introduced to reformulate the multistage stochastic investment model to a mixed-integer linear programming model. The wind penetration, investment decisions, and the optimality of the decision-dependent model are evaluated in a series of multistage case studies. The results show that the proposed decision-dependent model provides effective optimization solutions for long-term generation expansion planning.

  1. SELF: expert system for supporting verification of network operating constraints in power transmission planning

    Energy Technology Data Exchange (ETDEWEB)

    Cicoria, R; Migliardi, P [Ente Nazionale per l` Energia Elettrica, Milan (Italy); Pogliano, P [Centro Informazioni Studi Esperienze (CISE), Milan (Italy)

    1995-06-01

    Performing planned studies into very large HV transmission systems is a very complex task which requires the use of simulation models and the application of the heuristic acquired by expert palnners during previous studies. The ENEL Electric Research Center and the CISE Artificial Intelligence Section have developed a knowledge-based system, named SELF, which is aimed at supporting the transmission system palnner. SELF is capable of assisting the engineer both in finding the convergence of the load flow calculation and determining solutions that respect active power, voltage and VAR operating constraints. This paper describes the overall architecture of the system and shows its integration in a larger planning environment called SPIRA, currently utilized at ENEL. More details are given on the least completed modules, the redispatching and network reinforcement subsystems which deal with active power constraint verification.

  2. The Evolution of Power System Planning with High Levels of Variable Renewable Generation

    Energy Technology Data Exchange (ETDEWEB)

    Katz, Jessica [National Renewable Energy Lab. (NREL), Golden, CO (United States); Milligan, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    Greening the Grid provides technical assistance to energy system planners, regulators, and grid operators to overcome challenges associated with integrating variable renewable energy into the grid. This document, part of the Greening the Grid introduces the evolution of power system planning with high levels of variable renewable generation.

  3. Draft Environmental Impact Statement: BPA/Puget Power Northwest Washington Transmission Project

    International Nuclear Information System (INIS)

    1993-11-01

    Bonneville Power Administration (BPS) and Puget Sound Power ampersand Light (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit County area between the towns of Custer and Sedro Woolley, including within the city of Bellingham starting in 1995. The upgrades of the interconnected 230,000 volt (230-kV) and 115-kV systems are needed to increase the reliability of the local transmission system and to increase the import capacity on a nearby US-Canada 500-kV intertie by about 850 megawatts (MW). The increase in north-south transfer capability would be shared by BPA and Puget Power (about 425 MW each). Other actions would include replacement of an existing BPA 230-kV single-circuit, wood-pole H-frame transmission line with a lattice-steel double-circuit line; an existing Puget Power 115-kV single wood-pole transmission line rebuild, two short 115-kV Puget Power lines added at BPA's Bellingham Substation; and improvements made at existing BPA and Puget Power substations

  4. Reduction of regional disparities in electric power prices by spatially effective measures and planning in the Federal Republic of Germany

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, G

    1984-01-01

    For a long time energy policy has been trying to reduce disparities in electric power prices by administrative and financial measures alone. Governmental planning was opening up new prospects when long-range fuel transport - and in particular the transport of hard coal by ship or by rail - was seeing a drop in prices in the mid seventies. Since fuel transport has been lower-priced than the transport of equivalent quantities of electric power, regional disparities in electric power prices which are due to the respective supply structures may be levelled by way of power plant site selection and power plant installation according to the specific regional loads. A decentralized expansion of power generation within reach of the consumer requires but a minimum of wiring. Structural price disparities are reduced in particular in regions importing electric power at excessive prices. In addition, costs may be saved by rational energy utilization consisting above all in the application of dual-purpose power plants and by the rationalization of network infrastuctures. The study abstracted is part of a research project of the Federal Research Institute for Land Studies and Planning. The project is dealing with concepts of decentralized electric power supply and space heating. It adds to already existing related studies which deal above all with the basic problems of scheduling and planning the contents and inner structure of decentralized energy concepts.

  5. 77 FR 50979 - Northwest Forest Plan Provincial Advisory Committees

    Science.gov (United States)

    2012-08-23

    ... Division, Bonneville Power Administration, Department of Defense, and Natural Resources Conservation... community. The PACs may invite a representative of the State Community Economic [[Page 50980..., individuals with demonstrated ability to represent minorities, women, and persons with disabilities. Dated...

  6. Planning the nuclear contribution to the Brazilian power program

    International Nuclear Information System (INIS)

    Barbalho, A. Rodrigues; Alves, R. Nazare; Pinto, C. Syllus M.; Souza Santos, T.D. de; Abrao, A.

    1977-01-01

    The thermo-electric power in Brazil accounts for less than 20% of the total generating capacity. Brazil's power is essentially generated hydraulically, which grants the growing development. The electric energy consumption keeps growing, with the annual average rate of 13%/year in the last five years. The present installed capacity is 20 000 MWe and the projections are: 35 000MWe, in 1980; 50 000 MWe in 1985; 75 000 MWe, in 1990 and 150 000 MWe, in 2 000. Most of the hydraulic resources are located in remote areas of the country, very far from the consumption centers. Under the agreement between the Federal Republic of Germany and Brazil (signed in June 1975), besides the nuclear power station, American made, under construction in Agra dos Reis, with a power capacity of 626 MWe, two more units, each one with 1 300 MWe capacity are to be erected at the same site, and planned to be in operation in 1982 and 1983. Several joint German-Brazilian companies will be established for reactor and fuel manufacture, in the country. The Brazilian state holding nuclear company, Empresas Nucleares Brasileiras S/A., NUCLEBRAS, will participate in the formation of all joint companies with at least 51% of capital investments. The Brazilian Government will spend 10 billion dollars (U.S.), during the agreement's duration, to make its industry stronger, to develop its technology and to reduce its dependence on energy imports. Brazil's target: full independence in nuclear technology (including reactor manufacture and complete fuel cycle) in about 15 years [es

  7. 2010 Ecological Survey of the Pacific Northwest National Laboratory Site

    Energy Technology Data Exchange (ETDEWEB)

    Chamness, Michele A.; Perry, Christopher; Downs, Janelle L.; Powell, Sylvia D.

    2011-02-16

    The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL Site comply with applicable laws, policies, and DOE orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL Site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL Site is described in Larson and Downs (2009). There are currently two facilities on the PNNL Site: the William R. Wiley Environmental Molecular Sciences Laboratory (EMSL), and the recently completed Physical Sciences Facility (PSF). This report describes the results of the annual survey of the biological resources found on the undeveloped portions of the PNNL Site in 2010. A brief description of the methods PNNL ecologists used to conduct the surveys and the results of the surveys are presented. Actions taken to fully delineate noxious weed populations discovered in 2009 and efforts in 2010 to control those weeds also are described. Appendix A provides a list of plant and

  8. Exchange of current BPA surplus power for future power from certain companies' share of WNP-3 to settle a dispute over construction delay. Record of decision. Volume I

    International Nuclear Information System (INIS)

    1985-01-01

    This Record of Decision (ROD) sets forth the Bonneville Power Administration's (BPA) reasons for settling litigation over the delay in constructing Washington Public Power Supply System (Supply System) Nuclear Project No. 3 (WNP-3). The litigation concerns the decision in May 1983 to defer construction until financing becomes available to the Supply System and a demonstrable need for the Project is established. The construction deferral was made at the request of the Administrator of BPA, a federal power marketing agency in the Pacific Northwest. BPA is obligated to pay principal and interest on bonds sold by the Supply System to finance 70 percent of the project. The construction delay was opposed by the project's minority owners, four Northwest investor-owned utilities (companies) which collectively own 30 percent of the project

  9. Navigable windows of the Northwest Passage

    Science.gov (United States)

    Liu, Xing-he; Ma, Long; Wang, Jia-yue; Wang, Ye; Wang, Li-na

    2017-09-01

    Artic sea ice loss trends support a greater potential for Arctic shipping. The information of sea ice conditions is important for utilizing Arctic passages. Based on the shipping routes given by ;Arctic Marine Shipping Assessment 2009 Report;, the navigable windows of these routes and the constituent legs were calculated by using sea ice concentration product data from 2006 to 2015, by which a comprehensive knowledge of the sea ice condition of the Northwest Passage was achieved. The results showed that Route 4 (Lancaster Sound - Barrow Strait - Prince Regent Inlet and Bellot Strait - Franklin Strait - Larsen Sound - Victoria Strait - Queen Maud Gulf - Dease Strait - Coronation Gulf - Dolphin and Union Strait - Amundsen Gulf) had the best navigable expectation, Route 2 (Parry Channel - M'Clure Strait) had the worst, and the critical legs affecting the navigation of Northwest Passage were Viscount Melville Sound, Franklin Strait, Victoria Strait, Bellot Strait, M'Clure Strait and Prince of Wales Strait. The shortest navigable period of the routes of Northwest Passage was up to 69 days. The methods used and the results of the study can help the selection and evaluation of Arctic commercial routes.

  10. Wien Automatic System Planning (WASP) Package. A computer code for power generating system expansion planning. Version WASP-III Plus. User's manual. Volume 1: Chapters 1-11

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    As a continuation of its effort to provide comprehensive and impartial guidance to Member States facing the need for introducing nuclear power, the IAEA has completed a new version of the Wien Automatic System Planning (WASP) Package for carrying out power generation expansion planning studies. WASP was originally developed in 1972 in the USA to meet the IAEA's needs to analyze the economic competitiveness of nuclear power in comparison to other generation expansion alternatives for supplying the future electricity requirements of a country or region. The model was first used by the IAEA to conduct global studies (Market Survey for Nuclear Power Plants in Developing Countries, 1972-1973) and to carry out Nuclear Power Planning Studies for several Member States. The WASP system developed into a very comprehensive planning tool for electric power system expansion analysis. Following these developments, the so-called WASP-Ill version was produced in 1979. This version introduced important improvements to the system, namely in the treatment of hydroelectric power plants. The WASP-III version has been continually updated and maintained in order to incorporate needed enhancements. In 1981, the Model for Analysis of Energy Demand (MAED) was developed in order to allow the determination of electricity demand, consistent with the overall requirements for final energy, and thus, to provide a more adequate forecast of electricity needs to be considered in the WASP study. MAED and WASP have been used by the Agency for the conduct of Energy and Nuclear Power Planning Studies for interested Member States. More recently, the VALORAGUA model was completed in 1992 as a means for helping in the preparation of the hydro plant characteristics to be input in the WASP study and to verify that the WASP overall optimized expansion plan takes also into account an optimization of the use of water for electricity generation. The combined application of VALORAGUA and WASP permits the

  11. Bird on the wire: Landscape planning considering costs and benefits for bird populations coexisting with power lines.

    Science.gov (United States)

    D'Amico, Marcello; Catry, Inês; Martins, Ricardo C; Ascensão, Fernando; Barrientos, Rafael; Moreira, Francisco

    2018-02-24

    Power-line grids are increasingly expanding worldwide, as well as their negative impacts on avifauna, namely the direct mortality through collision and electrocution, the reduction of breeding performance, and the barrier effect. On the other hand, some bird species can apparently benefit from the presence of power lines, for example perching for hunting purposes or nesting on electricity towers. In this perspective essay, we reviewed the scientific literature on both costs and benefits for avifauna coexisting with power lines. Overall, we detected a generalized lack of studies focusing on these costs or benefits at a population level. We suggest that a switch in research approach to a larger spatio-temporal scale would greatly improve our knowledge about the actual effects of power lines on bird populations. This research approach would facilitate suitable landscape planning encompassing both mitigation of costs and promotion of benefits for bird populations coexisting with power lines. For example, the strategic route planning of electricity infrastructures would limit collision risk or barrier effects for threatened bird populations. Concurrently, this strategic route planning would promote the range expansion of threatened populations of other bird species, by providing nesting structures in treeless but potentially suitable landscapes. We suggest establishing a collaborative dialogue among the scientific community, governments, and electricity companies, with the aim to produce a win-win scenario in which both biodiversity conservation and infrastructure development are integrated in a common strategy.

  12. Household energy conservation attitudes and behaviors in the Northwest: Tracking changes between 1983 and 1985

    Energy Technology Data Exchange (ETDEWEB)

    Fang, J.M.; Hattrup, M.P.; Nordi, R.T.; Shankle, S.A.; Ivey, D.L.

    1987-05-01

    Pacific Northwest Laboratory (PNL) has analyzed the changes in consumer energy conservation attitudes and behaviors in the Pacific Northwest between 1983 and 1985. The information was collected through stratified random telephone surveys on 2000 and 1058 households, respectively, for 1983 and 1985 in the Bonneville Power Administration (BPA) service area in Idaho, Oregon, Washington and Western Montana. This report covers four topic areas and tests two hypotheses. The topics are as follows: consumer perceptions and attitudes of energy use and conservation in the home; consumer perceptions of energy institutions and other entities; past and intended conservation actions and investments; and segmentation of homeowners into market prospect groups. The hypotheses tested are as follows: (1) There has been no change in the size and psychographic make-up of the original three market segments found in the 1983 survey analysis; and (2) image profiles of institutions with respect to familiarity, overall impression, and believability as sources of energy conservation information remain unchanged since 1983.

  13. Economic Evaluation of Decommissioning Cost of Nuclear Power Plant in the National Electricity Plan in Korea

    International Nuclear Information System (INIS)

    Lee, Man Ki; Nam, Ji Hee

    2008-01-01

    Decommissioning cost of a nuclear power plant includes the costs related with dismantling a nuclear power plant, disposal of a spent fuel and of a low/medium radioactive waste. The decommissioning cost is different from the other expenditures in that it is occurred after the reactor finishes its commercial operation. In this respect, the electricity act was enforced to secure provisions for decommissioning a nuclear power plant during its commercial operation. The purpose of this study is to provide economic evaluation and economic cost for a decommissioning when the cost of a decommissioning is provided as one of input to the national electricity plan. Therefore, this study does not deal with whether the estimated amount of a decommissioning cost is just or not. This study focuses how to transfer the estimated decommissioning cost given in the electricity act to the economic cost, which can be used in the national electricity plan

  14. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  15. Planning For Multiple NASA Missions With Use Of Enabling Radioisotope Power

    Energy Technology Data Exchange (ETDEWEB)

    S.G. Johnson; K.L. Lively; C.C. Dwight

    2013-02-01

    Since the early 1960’s the Department of Energy (DOE) and its predecessor agencies have provided radioisotope power systems (RPS) to NASA as an enabling technology for deep space and various planetary missions. They provide reliable power in situations where solar and/or battery power sources are either untenable or would place an undue mass burden on the mission. In the modern era of the past twenty years there has been no time that multiple missions have been considered for launching from Kennedy Space Center (KSC) during the same year. The closest proximity of missions that involved radioisotope power systems would be that of Galileo (October 1989) and Ulysses (October 1990). The closest that involved radioisotope heater units would be the small rovers Spirit and Opportunity (May and July 2003) used in the Mars Exploration Rovers (MER) mission. It can be argued that the rovers sent to Mars in 2003 were essentially a special case since they staged in the same facility and used a pair of small launch vehicles (Delta II). This paper examines constraints on the frequency of use of radioisotope power systems with regard to launching them from Kennedy Space Center using currently available launch vehicles. This knowledge may be useful as NASA plans for its future deep space or planetary missions where radioisotope power systems are used as an enabling technology. Previous descriptions have focused on single mission chronologies and not analyzed the timelines with an emphasis on multiple missions.

  16. A plan for safety evaluation of tsunamis at the Uljin nuclear power plant site

    International Nuclear Information System (INIS)

    Lee, H. K.; Lee, D. S.

    1999-01-01

    The sites of many nuclear and thermal power plants are located along the coast line to obtain necessary cooling water. Therefore, they are vulnerable to coastal disasters like tsunamis. The safety evaluation on tsunamis of the site of Uljin nuclear power plants was performed with the maximum potential earthquake magnitude and related fault parameters in 1986. But according to the results of recent research, the possibility was suggested that the earthquake which has bigger magnitude than was expected is likely to happen in the seismic gaps near Akita, Japan. Therefore, a plan for safety evaluation of tsunamis at the Uljin nuclear power plants was laid out

  17. Long-term power generation expansion planning with short-term demand response: Model, algorithms, implementation, and electricity policies

    Science.gov (United States)

    Lohmann, Timo

    Electric sector models are powerful tools that guide policy makers and stakeholders. Long-term power generation expansion planning models are a prominent example and determine a capacity expansion for an existing power system over a long planning horizon. With the changes in the power industry away from monopolies and regulation, the focus of these models has shifted to competing electric companies maximizing their profit in a deregulated electricity market. In recent years, consumers have started to participate in demand response programs, actively influencing electricity load and price in the power system. We introduce a model that features investment and retirement decisions over a long planning horizon of more than 20 years, as well as an hourly representation of day-ahead electricity markets in which sellers of electricity face buyers. This combination makes our model both unique and challenging to solve. Decomposition algorithms, and especially Benders decomposition, can exploit the model structure. We present a novel method that can be seen as an alternative to generalized Benders decomposition and relies on dynamic linear overestimation. We prove its finite convergence and present computational results, demonstrating its superiority over traditional approaches. In certain special cases of our model, all necessary solution values in the decomposition algorithms can be directly calculated and solving mathematical programming problems becomes entirely obsolete. This leads to highly efficient algorithms that drastically outperform their programming problem-based counterparts. Furthermore, we discuss the implementation of all tailored algorithms and the challenges from a modeling software developer's standpoint, providing an insider's look into the modeling language GAMS. Finally, we apply our model to the Texas power system and design two electricity policies motivated by the U.S. Environment Protection Agency's recently proposed CO2 emissions targets for the

  18. Relationship between regional planning and site finding of power stations with regard to energy supply

    International Nuclear Information System (INIS)

    Hoppe, I.

    1980-01-01

    Based on the discussion on energy policy generally brought in the fore, spatial relationships are discussed especially in the field of electricity supply. A review is given of the legal systematism in which electricity supply and regional planning are to be found. How state planners organize the provision with sites for high-capacity thermal power stations is described as the concrete development of systematic legal relationships, concepts of, and opportunities for, state and regional planning. In the main part, this paper focusses on the analysis of the course of development power station construction and the distribution system have taken with regard to the question as to whether and to what extent this technological character is also responsible for an emerging structure in which these plants are mainly centred in a special region. (orig.) [de

  19. Revision of the second basic plans of power reactor development in Power Reactor and Nuclear Fuel Development Corporation

    International Nuclear Information System (INIS)

    1978-01-01

    Revision of the second basic plans concerning power reactor development in PNC (Power Reactor and Nuclear Fuel Development Corporation) is presented. (1) Fast breeder reactors: As for the experimental fast breeder reactor, after reaching the criticality, the power is raised to 50 MW thermal output within fiscal 1978. The prototype fast breeder reactor is intended for the electric output of 200 MW -- 300 MW, using mixed plutonium/uranium oxide fuel. Along the above lines, research and development will be carried out on reactor physics, sodium technology, machinery and parts, nuclear fuel, etc. (2) Advanced thermal reactor: The prototype advanced thermal reactor, with initial fuel primarily of slightly enriched uranium and heavy water moderation and boiling water cooling, of 165 MW electric output, is brought to its normal operation by the end of fiscal 1978. Along the above lines, research and development will be carried out on reactor physics, machinery and parts, nuclear fuel, etc. (Mori, K

  20. 2011 Annual Ecological Survey: Pacific Northwest National Laboratory Site

    Energy Technology Data Exchange (ETDEWEB)

    Becker, James M.; Chamness, Michele A.

    2012-02-27

    The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL site comply with applicable laws, policies, and DOE Orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL site is described in Larson and Downs (2009). There are currently two facilities on the PNNL site: the William R. Wiley Environmental Molecular Sciences Laboratory and the Physical Sciences Facility. This report describes the annual survey of biological resources found on the undeveloped upland portions of the PNNL site. The annual survey is comprised of a series of individual field surveys conducted on various days in late May and throughout June 2011. A brief description of the methods PNNL ecologists used to conduct the baseline surveys and a summary of the results of the surveys are presented. Appendix A provides a list of plant and animal species identified in the

  1. Regional power systems planning: a state of the art assessment. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    The purpose of this report was to define regional power systems planning problems, the tools available and their shortcomings, and to document all of the above in a concise readable form. The approach consisted of a survey and literature search. The survey determined the tools being used by utilities, the tools they had rejected, and the tools they planned to try out. The literature search was conducted for the purpose of documenting the tools available, and performing a comparative analysis of these tools. The project included a mix of utility, university, and consulting organizations. Several organizations were consulted in the selection of the participants. A non-profit organization, The University of Oklahoma, was selected to manage the project. The results were reviewed in a series of four one day meetings by known authorities in each field. This report consists of the results of this project. Perhaps its major finding is that several aspects of the regional planning problem are not well defined, the roles of the various participants in regional planning is not clear, and certainly research is needed for the development of new methodology.

  2. Evaluation of Phenolic Content and Antioxidant Capacity of Blueberry Cultivars (Vaccinium corymbosum L. Grown in the Northwest Croatia

    Directory of Open Access Journals (Sweden)

    Verica Dragović-Uzelac

    2010-01-01

    Full Text Available The aim of this study is to evaluate the content of phenolics: total phenols (TPC, flavonoids (TF, anthocyanins (TA, flavan-3-ols (TF3ols, as well as total antioxidant capacity (TAC and reducing power (RP in four blueberry cultivars (Vaccinium corymbosum L. introduced in the Northwest Croatian climate conditions. Phenolic compounds were measured by spectrophotometric methods, TAC was determined using DPPH and ABTS assays and RP by FRAP assay. All cultivars contained high mass fraction of TPC, TF, TA and lower mass fraction of TF3ols. Among the researched fruits, Sierra cultivar contained the highest amounts of all groups of phenolics, followed by Elliott>Bluecrop≥Duke. Significant differences were observed in phenolic mass fraction among different cultivars and growing seasons (p<0.05, and phenolic compounds were significantly higher in growing season 2006. Examined cultivars possess high antioxidant capacity and reducing power, and all phenolics were highly correlated with TAC and RP (R=0.46 to 0.99. The study indicated that growing and climate conditions in Northwest Croatia are convenient for introducing blueberry cultivars. Generally, blueberry fruits are a rich source of phenolics, which show evident antioxidant capacity.

  3. An integrated GIS environment enhancing the operation and planning of power utilities

    International Nuclear Information System (INIS)

    Yared, George Antoine

    1996-05-01

    The evolution of electrical power systems was tightly geared by the development of two fields: power engineering, with the advanced technology of physical elements comprising all parts of a power system, and information processing tools to manage the performance of electric power utilities. Compared to power engineering that has gone through tremendous developments, information technology applications for electrical power systems are relatively young. The possible improvements of these applications are in their graphical, mapping an data analysis capabilities. State-of-the art information technology such as Geographic Information Systems provides these facilities. The objective of this thesis is to devise a technique that combines power system software tools with the Geographic Information Systems software to enhance the operation, control and planning of electrical transmission systems. The load flow, voltage control and fault analysis models for the transmission system will be re-engineered in a Geographic Information System environment.The research is generic, special attention is given to its application to the Lebanese electrical power system, which is recovering from an infrastructure devastating war. The research entails integrating power systems analysis and control package, or PSACP developed at the AUB within a Geographic Information Systems environment. This will enhance the power modeling capabilities by the use of powerful thematic mapping, geographic and data analysis and user interface techniques that come with Geographic Information Systems. An overview of the two technologies involved is presented, followed by a detailed description of the integration technique before describing the integrated system. Moving to a higher level, the features of the system are presented, followed by sample applications of the integrated system on the Lebanese electrical power system. The thesis contributes to the research arena by developing a software re

  4. Stages in planning and construction of the Muelheim-Kaerlich nuclear power station

    International Nuclear Information System (INIS)

    Pracht, F.

    1975-01-01

    On October 23, 1972, RWE gave a letter of intent and on January 9, 1973 an order for the construction of a nuclear power plant on a turn-key basis to the consortium of BBC, BBR and Hochtief. The power plant in question was the Muelheim-Kaerlich nuclear power station with a pressurized-water reactor of a gross efficiency of 1,295 MWe. After considerable delay of the project, the first building permit was issued to the builder-owner on January 15, 1975, and the constructional work on the building site started immediately afterwards. As the planning and constructional work has so far been carried out according to schedule and the consortium intends to keep the effects of the belated license as small as possible, the start-off of the plant will probably be in summer 1979 if the constructional work is not interrupted. (orig./AK) [de

  5. Change in plan for installation of nuclear reactor in Genkai Nuclear Power Plant of Kyushu Electric Power Co., Inc. (change in plan for No.3 and No.4 nuclear reactor facilities) (report)

    International Nuclear Information System (INIS)

    1987-01-01

    This report, compiled by the Nuclear Safety Commission to be submitted to the Minister of International Trade and Industry, deals with studies on a proposed change in the plan for the installation of nuclear reactors in the Genkai Nuclear Power Plant of Kyushu Electric Power Co., Inc. (change in the plan for the No.3 and No.4 nuclear reactor facilities). The conclusions of and principles for the examination and evaluation are described first. The studies carried out are focused on the safety of the facilities, and it is concluded that part of the proposed change is appropriate with respect to the required technical capability and that part of the change will not have adverse effects on the safety design of the facilities. The examination of the safety design of the reactor facilities cover the reactivity control, new material for the steam generator, design of chemical and volume control systems, design of liquid waste treatment facilities, integration of all confinement vessel spray rings, and design of the diesel power generator. It is confirmed that all of them can meet the safety requirements. Studies and analyses are also made of the emission of radiations to the surrounding environment, abnormal transient changes during operations, and possible accidents. (Nogami, K.)

  6. Case study : power distribution PBR plans of National Grid USA

    International Nuclear Information System (INIS)

    Hill, T.

    2001-01-01

    This power point presentation described the progressive approach taken by the Northeastern United States towards electric power restructuring and performance based ratemaking (PBR) with reference to National Grid USA and the NEES tradition of pursuing regulatory matters. The catalyst for change was the NEES acquisition of EUA (and National Grid USA acquisition of NEES). Another catalyst for change was the desire to merge operating companies and consolidate rates. This paper described the settlement negotiations of the New England Process with reference to meeting the customer's desire for lower electricity prices and rate stability.The paper also described a multi-year PBR-based plan proposed for Niagara Mohawk which offers incentives for both cost efficiency and service quality. It was concluded that PBR is a sound basis for optimizing customer and shareholder benefits. It was emphasized that while PBR has universal application, detailed implementation must be sensitive to local issues and priorities. tabs., figs

  7. Making Dreams, Not Babies: The Power of Hope in a Teen Family Planning Clinic.

    Science.gov (United States)

    Raines, Kimberly

    2018-04-01

    Teenage pregnancy is a signifi cant social issue in the United States, resulting in increased levels of poverty. Most public health family planning efforts have traditionally focused on teaching teens the how-to of contraception, with little focus on teaching the why-to. During my time as a nurse practitioner in a public health department family planning clinic, I developed a method to open discussions with patients about the possibilities of a future that includes delayed childbearing. My experience with this strategy taught me that hope may indeed be the most powerful contraceptive of all.

  8. Making dreams, not babies: the power of hope in a teen family planning clinic.

    Science.gov (United States)

    Raines, Kimberly

    2009-01-01

    Teenage pregnancy is a significant social issue in the United States, resulting in increased levels of poverty. Most public health family planning efforts have traditionally focused on teaching teens the how-to of contraception, with little focus on teaching the why-to. During my time as a nurse practitioner in a public health department family planning clinic, I developed a method to open discussions with patients about the possibilities of a future that includes delayed childbearing. My experience with this strategy taught me that hope may indeed be the most powerful contraceptive of all.

  9. 75 FR 48986 - Northwest Area Water Supply Project, North Dakota

    Science.gov (United States)

    2010-08-12

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  10. 75 FR 49518 - Northwest Area Water Supply Project, North Dakota

    Science.gov (United States)

    2010-08-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  11. Power generation capacity planning under budget constraint in developing countries

    International Nuclear Information System (INIS)

    Afful-Dadzie, Anthony; Afful-Dadzie, Eric; Awudu, Iddrisu; Banuro, Joseph Kwaku

    2017-01-01

    Highlights: • A long term stochastic GEP model with budget constraint is developed. • Model suitable for analyzing GEP problems in developing countries. • Model determines optimal mix, size and timing of future generation capacity needs. • A real case study of the Ghana GEP problem was employed. • Insufficient budget leads to costly generation capacity expansion plans. - Abstract: This paper presents a novel multi-period stochastic optimization model for studying long-term power generation capacity planning in developing countries. A stylized model is developed to achieve three objectives: (1) to serve as a tool for determining optimal mix, size and timing of power generation types in the face of budget constraint, (2) to help decision makers appreciate the consequences of capacity expansion decisions on level of unserved electricity demand and its attendant impact on the national economy, and (3) to encourage the habit of periodic savings towards new generation capacity financing. The problem is modeled using a stochastic mixed-integer linear programming (MILP) technique under demand uncertainty. The effectiveness of the model, together with valuable insights derived from considering different levels of budget constraints are demonstrated using Ghana as a case study. The results indicate that at an annual savings equivalent to 0.75% of GDP, Ghana could finance the needed generation capacity to meet approximately 95% of its annual electricity demand between 2016 and 2035. Additionally, it is observed that as financial constraint becomes tighter, decisions on the mix of new generation capacities tend to be more costly compared to when sufficient funds are available.

  12. Optimal reactive power planning for distribution systems considering intermittent wind power using Markov model and genetic algorithm

    Science.gov (United States)

    Li, Cheng

    Wind farms, photovoltaic arrays, fuel cells, and micro-turbines are all considered to be Distributed Generation (DG). DG is defined as the generation of power which is dispersed throughout a utility's service territory and either connected to the utility's distribution system or isolated in a small grid. This thesis addresses modeling and economic issues pertaining to the optimal reactive power planning for distribution system with wind power generation (WPG) units. Wind farms are inclined to cause reverse power flows and voltage variations due to the random-like outputs of wind turbines. To deal with this kind of problem caused by wide spread usage of wind power generation, this thesis investigates voltage and reactive power controls in such a distribution system. Consequently static capacitors (SC) and transformer taps are introduced into the system and treated as controllers. For the purpose of getting optimum voltage and realizing reactive power control, the research proposes a proper coordination among the controllers like on-load tap changer (OLTC), feeder-switched capacitors. What's more, in order to simulate its uncertainty, the wind power generation is modeled by the Markov model. In that way, calculating the probabilities for all the scenarios is possible. Some outputs with consecutive and discrete values have been used for transition between successive time states and within state wind speeds. The thesis will describe the method to generate the wind speed time series from the transition probability matrix. After that, utilizing genetic algorithm, the optimal locations of SCs, the sizes of SCs and transformer taps are determined so as to minimize the cost or minimize the power loss, and more importantly improve voltage profiles. The applicability of the proposed method is verified through simulation on a 9-bus system and a 30-bus system respectively. At last, the simulation results indicate that as long as the available capacitors are able to sufficiently

  13. Radio-ecological characterization and radiological assessment in support of regulatory supervision of legacy sites in northwest Russia

    International Nuclear Information System (INIS)

    Sneve, M.K.; Kiselev, M.; Shandala, N.K.

    2014-01-01

    The Norwegian Radiation Protection Authority has been implementing a regulatory cooperation program in the Russian Federation for over 10 years, as part of the Norwegian government's Plan of Action for enhancing nuclear and radiation safety in northwest Russia. The overall long-term objective has been the enhancement of safety culture and includes a special focus on regulatory supervision of nuclear legacy sites. The initial project outputs included appropriate regulatory threat assessments, to determine the hazardous situations and activities which are most in need of enhanced regulatory supervision. In turn, this has led to the development of new and updated norms and standards, and related regulatory procedures, necessary to address the often abnormal conditions at legacy sites. This paper presents the experience gained within the above program with regard to radio-ecological characterization of Sites of Temporary Storage for spent nuclear fuel and radioactive waste at Andreeva Bay and Gremikha in the Kola Peninsula in northwest Russia. Such characterization is necessary to support assessments of the current radiological situation and to support prospective assessments of its evolution. Both types of assessments contribute to regulatory supervision of the sites. Accordingly, they include assessments to support development of regulatory standards and guidance concerning: control of radiation exposures to workers during remediation operations; emergency preparedness and response; planned radionuclide releases to the environment; development of site restoration plans, and waste treatment and disposal. Examples of characterization work are presented which relate to terrestrial and marine environments at Andreeva Bay. The use of this data in assessments is illustrated by means of the visualization and assessment tool (DATAMAP) developed as part of the regulatory cooperation program, specifically to help control radiation exposure in operations and to support

  14. National development plan for transmission arrangement in the electric power system 1995-2005; Nasjonal utbyggingsplan for overfoeringsanlegg i elkraftsystemet 1995-2005

    Energy Technology Data Exchange (ETDEWEB)

    Moi, K.A.; Trengereid, F.

    1996-09-01

    The report concerns the national development plan for the electric power transmission system in Norway. The aim of the plan is to give a simple and collected survey of estimated demand of investment connected to the regional and central grids in the period from 1995 to 2005 based on these development plans, and to give a survey over the different power and energy prognoses being used. There is emphasized that the work of planning is a continuous process where changed premises can make an influence on both the schedule and the extent of necessary measures. The investment is calculated to be about NOK 15 billion in the period mentioned which comprise both new system designs and modernization of existing transmission systems. Dimensioned power capacity and the energy consumption are assumed to increase on an average of about 1.8 per cent towards the year of 2010. 10 figs., 2 tabs.

  15. Workshop: Research and development plans for high power spallation neutron testing at BNL

    International Nuclear Information System (INIS)

    1996-01-01

    This report consists of vugraphs from presentations at the meeting. The papers covered the following topics: (1) APS as a proton source; (2) target status for NSNS (National Spallation Neutron Source); (3) spallation neutron source in Japan; (4) liquid LiBi flow loop; and (5) research and development plans for high power tests at the AGS

  16. The strategic economic plan and the role of independent power in economic development

    International Nuclear Information System (INIS)

    House, D.

    1993-01-01

    Independent power production (IPP) in Newfoundland was examined within the context of the province's Strategic Economic Plan. Provisions of the Plan were summarized, with special reference to the promotion of alternative energy technologies and government efforts to amend regulations to facilitate development of alternative energy sources by independent producers. IPP was considered to be an ideal tool for regional economic development and diversification, assuming that environmental concerns were carefully considered and addressed. Some of the benefits ascribed to IPP included strengthening the private sector, creating new small business opportunities, improving competitiveness, promoting regional development, contributing to import substitution and enhance the province's technology and knowledge base

  17. Characterization of residual radionuclide contamination within and around commercial nuclear power plants

    International Nuclear Information System (INIS)

    Robertson, D.E.; Abel, K.H.; Thomas, C.W.; Lepel, E.A.; Evans, J.C.; Thomas, W.V.; Carrick, L.C.; Leale, M.W.

    1985-07-01

    To provide a statistically valid data base for the residual radionuclide inventories in nuclear power stations, Pacific Northwest Laboratory (PNL) was contracted to conduct an extensive sampling and measurements program at a number of nuclear power plants. This paper summarizes the results of the radionuclide characterization studies conducted at seven nuclear power stations from a decommissioning assessment viewpoint

  18. Non-timber forest products of the North-West District of Guyana

    OpenAIRE

    Andel, T.R. van

    2000-01-01

    This thesis describes the use of non-timber forest products (NTFPs) by indigenous peoples of northwest Guyana. Part I contains a general analysis of NTFP harvesting in northwest Guyana Part II is an illustrated field guide of the useful plants encountered. Chapter 1: introduction Chapter 2: floristic composition and vegetation structure of well-drained mixed forest and 20- and 60-year old secondary forests. Previous forest inventories predicted a general low diversity for the North-West Distr...

  19. Switch: a planning tool for power systems with large shares of intermittent renewable energy.

    Science.gov (United States)

    Fripp, Matthias

    2012-06-05

    Wind and solar power are highly variable, so it is it unclear how large a role they can play in future power systems. This work introduces a new open-source electricity planning model--Switch--that identifies the least-cost strategy for using renewable and conventional generators and transmission in a large power system over a multidecade period. Switch includes an unprecedented amount of spatial and temporal detail, making it possible to address a new type of question about the optimal design and operation of power systems with large amounts of renewable power. A case study of California for 2012-2027 finds that there is no maximum possible penetration of wind and solar power--these resources could potentially be used to reduce emissions 90% or more below 1990 levels without reducing reliability or severely raising the cost of electricity. This work also finds that policies that encourage customers to shift electricity demand to times when renewable power is most abundant (e.g., well-timed charging of electric vehicles) could make it possible to achieve radical emission reductions at moderate costs.

  20. Non-linear multi-objective model for planning water-energy modes of Novosibirsk Hydro Power Plant

    Science.gov (United States)

    Alsova, O. K.; Artamonova, A. V.

    2018-05-01

    This paper presents a non-linear multi-objective model for planning and optimizing of water-energy modes for the Novosibirsk Hydro Power Plant (HPP) operation. There is a very important problem of developing a strategy to improve the scheme of water-power modes and ensure the effective operation of hydropower plants. It is necessary to determine the methods and criteria for the optimal distribution of water resources, to develop a set of models and to apply them to the software implementation of a DSS (decision-support system) for managing Novosibirsk HPP modes. One of the possible versions of the model is presented and investigated in this paper. Experimental study of the model has been carried out with 2017 data and the task of ten-day period planning from April to July (only 12 ten-day periods) was solved.

  1. Energy and environmental studies associated to the emergency plan of natural gas thermal power plants

    International Nuclear Information System (INIS)

    Ferreira, Vinicius V.M.; Grynberg, Sueli E.; Aronne, Ivan D.; Jacomino, Vanusa M.F.; Branco, Otavio E.A.; Martinez, Carlos B.; Versiani, Bruno R.

    2002-01-01

    This work presents a first exertion to evaluate the environmental impacts due to the operation of planned gas power plants. This study was carried out with the model EcoSense, that is a computer program developed for the quantification of environmental impacts and their external costs resulting from the operation of thermal power plants or other industrial activities. EcoSense is still in development and the achieved results should still be considered with caution although it becomes clear the potentiality of the use of this tool in the support of the decision making process in energy planning. Based on the method of approach of the damage function established in the ExternE project this program provides models for an integrated evaluation of the impact rate from the air pollutants resulting from burning fossil fuel, which are transported by the air. (author)

  2. Development and design of photovoltaic power prediction system

    Science.gov (United States)

    Wang, Zhijia; Zhou, Hai; Cheng, Xu

    2018-02-01

    In order to reduce the impact of power grid safety caused by volatility and randomness of the energy produced in photovoltaic power plants, this paper puts forward a construction scheme on photovoltaic power generation prediction system, introducing the technical requirements, system configuration and function of each module, and discussing the main technical features of the platform software development. The scheme has been applied in many PV power plants in the northwest of China. It shows that the system can produce reasonable prediction results, providing a right guidance for dispatching and efficient running for PV power plant.

  3. A fuzzy knowledge based method for maintenance planning in a power system

    International Nuclear Information System (INIS)

    Sergaki, Amalia; Kalaitzakis, Kostas

    2002-01-01

    The inspection planning in electric power industry is used to assess the safety and reliability of system components and to increase the ability of failure situation identification before it actually occurs. It reflects the implications of the available information on the operational and maintenance history of the system. The output is a ranked list of components, with the most critical ones at the top, which indicates the selection of the components to be inspected. In this paper, we demonstrate the use of a fuzzy relational database model for manipulating the data required for the criticality component ranking in thermal power systems inspection planning, incorporating criteria concerning aspects of safety and reliability, economy, variable operational conditions and environmental impacts. Often, qualitative thresholds and linguistic terms are used for the component criticality analysis. Fuzzy linguistic terms for criteria definitions along with fuzzy inference mechanisms allow the exploitation of the operators' expertise. The proposed database model ensures the representation and handling of the aforementioned fuzzy information and additionally offers to the user the functionality for specifying the precision degree by which the conditions involved in a query are satisfied. In order to illustrate the behavior of the model, a case study is given using real inspection data

  4. Grande Ronde Basin endemic spring chinook salmon supplementation program

    International Nuclear Information System (INIS)

    1998-02-01

    As part of its responsibilities under the Northwest Power Act (Pacific Northwest Electric Power Planning and Conservation Act of 1980), Bonneville Power Administration (BPA) must mitigate the loss of fish, wildlife, and related spawning grounds and habitat attributable to power production at federal hydroelectric dams on the Columbia River and its tributaries. The federal dams have been identified as a major source of mortality for the listed Snake River salmon stocks. BPA also has responsibilities under the Endangered Species Act (ESA) of 1973 to operate in a way that does not jeopardize the continued existence of listed species and to use its agency resources to conserve listed species

  5. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2001-09-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such

  6. Evaluation of utility residential energy conservation programs: A Pacific Northwest example

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E; Bronfman, B; Goeltz, R; Keating, K; Lerman, D; Timble, J

    1984-03-01

    This paper describes a detailed quantitative evaluation of the Residential Weatherization Pilot Program, operated by the Bonneville Power Administration from 1980 through 1982. The program provided free energy audits to more than 6000 electrically-heated homes and gave zero-interest loans to weatherize almost 4000 of these audited homes. The total cost of the program was almost $8 million. Using actual electricity consumption records for program participants and nonparticipants, we calculated the energy-saving effect of the pilot program in several ways and always reached the same conclusion. Households that received an audit and weatherization loan reduced their annual electricity consumption by about 3500 kWh relative to what they would have done without the program; this 3500 kWh is the saving that can be directly attributed to the program. Using a simple net present worth approach, the authors computed program benefits and costs for participating households, the BPA power system, and the Pacific Northwest region as a whole. Under a wide range of assumptions concerning discount rate, years until the weatherization loan is repaid, program energy saving, and BPA's marginal cost of power, the program is economically attractive from all three perspectives.

  7. An integrated stochastic multi-regional long-term energy planning model incorporating autonomous power systems and demand response

    International Nuclear Information System (INIS)

    Koltsaklis, Nikolaos E.; Liu, Pei; Georgiadis, Michael C.

    2015-01-01

    The power sector faces a rapid transformation worldwide from a dominant fossil-fueled towards a low carbon electricity generation mix. Renewable energy technologies (RES) are steadily becoming a greater part of the global energy mix, in particular in regions that have put in place policies and measures to promote their utilization. This paper presents an optimization-based approach to address the generation expansion planning (GEP) problem of a large-scale, central power system in a highly uncertain and volatile electricity industry environment. A multi-regional, multi-period linear mixed-integer linear programming (MILP) model is presented, combining optimization techniques with a Monte Carlo (MCA) method and demand response concepts. The optimization goal concerns the minimization of the total discounted cost by determining optimal power capacity additions per time interval and region, and the power generation mix per technology and time period. The model is evaluated on the Greek power system (GPS), taking also into consideration the scheduled interconnection of the mainland power system with those of selected autonomous islands (Cyclades and Crete), and aims at providing full insight into the composition of the long-term energy roadmap at a national level. - Highlights: • A spatial, multi-period, long-term generation expansion planning model is presented. • A Monte-Carlo method along with a demand response mechanism are incorporated. • Autonomous power systems interconnection is considered. • Electricity and CO 2 emission trade are taken into account. • Lignite, natural gas and wind power comprise the dominant power technologies

  8. Wien Automatic System Planning (WASP) Package. A computer code for power generating system expansion planning. Version WASP-III Plus. User's manual. Volume 1: Chapters 1-11

    International Nuclear Information System (INIS)

    1995-01-01

    As a continuation of its effort to provide comprehensive and impartial guidance to Member States facing the need for introducing nuclear power, the IAEA has completed a new version of the Wien Automatic System Planning (WASP) Package for carrying out power generation expansion planning studies. WASP was originally developed in 1972 in the USA to meet the IAEA's needs to analyze the economic competitiveness of nuclear power in comparison to other generation expansion alternatives for supplying the future electricity requirements of a country or region. The model was first used by the IAEA to conduct global studies (Market Survey for Nuclear Power Plants in Developing Countries, 1972-1973) and to carry out Nuclear Power Planning Studies for several Member States. The WASP system developed into a very comprehensive planning tool for electric power system expansion analysis. Following these developments, the so-called WASP-Ill version was produced in 1979. This version introduced important improvements to the system, namely in the treatment of hydroelectric power plants. The WASP-III version has been continually updated and maintained in order to incorporate needed enhancements. In 1981, the Model for Analysis of Energy Demand (MAED) was developed in order to allow the determination of electricity demand, consistent with the overall requirements for final energy, and thus, to provide a more adequate forecast of electricity needs to be considered in the WASP study. MAED and WASP have been used by the Agency for the conduct of Energy and Nuclear Power Planning Studies for interested Member States. More recently, the VALORAGUA model was completed in 1992 as a means for helping in the preparation of the hydro plant characteristics to be input in the WASP study and to verify that the WASP overall optimized expansion plan takes also into account an optimization of the use of water for electricity generation. The combined application of VALORAGUA and WASP permits the

  9. Pollution prevention program implementation plan

    International Nuclear Information System (INIS)

    Engel, J.A.

    1996-09-01

    The Pollution Prevention Program Implementation Plan (the Plan) describes the Pacific Northwest National Laboratory's (PNNL) Pollution Prevention (P2) Program. The Plan also shows how the P2 Program at PNNL will be in support of and in compliance with the Hanford Site Waste Minimization and Pollution Prevention (WMin/P2) Awareness Program Plan and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation. In addition, this plan describes how PNNL will demonstrate compliance with various legal and policy requirements for P2. This plan documents the strategy for implementing the PNNL P2 Program. The scope of the P2 Program includes implementing and helping to implement P2 activities at PNNL. These activities will be implemented according to the Environmental Protection Agency's (EPA) hierarchy of source reduction, recycling, treatment, and disposal. The PNNL P2 Program covers all wastes generated at the Laboratory. These include hazardous waste, low-level radioactive waste, radioactive mixed waste, radioactive liquid waste system waste, polychlorinated biphenyl waste, transuranic waste, and sanitary waste generated by activities at PNNL. Materials, resource, and energy conservation are also within the scope of the PNNL P2 Program

  10. 21st Century Power Partnership Fellowship Program: Supporting Next-generation Planning Modeling Practices at South Africa's Power Utility Eskom

    Energy Technology Data Exchange (ETDEWEB)

    Zinaman, Owen

    2016-10-01

    This presentation details the 21st Century Power Partnership's fellowship program accomplishments from 2016. This fellowship brought two fellows from South Africa's power utility, Eskom, to the U.S. Department of Energy's National Renewable Energy Laboratory. The fellows spent two weeks working to improve the fidelity of Eskom's PLEXOS long-term and short-term models, which are used in long-term generation planning exercises and capacity adequacy assessments. The fellows returned to Eksom equipped with a new suite of tools and skills to enhance Eksom's PLEXOS modeling capabilities.

  11. A cost-benefit analysis of power generation from commercial reinforced concrete solar chimney power plant

    International Nuclear Information System (INIS)

    Li, Weibing; Wei, Ping; Zhou, Xinping

    2014-01-01

    Highlights: • We develop an economic model different from related models. • We evaluate the initial investment cost of a plant built in northwest China. • We analyze the cost and benefit of a plant built in northwest China. • By the sensitivity analysis, we examine the sensitivity of TNPV to many parameters. - Abstract: This paper develops a model different from existing models to analyze the cost and benefit of a reinforced concrete solar chimney power plant (RCSCPP) built in northwest China. Based on the model and some assumptions for values of parameters, this work calculates total net present value (TNPV) and the minimum electricity price in each phase by dividing the whole service period into four phases. The results show that the minimum electricity price in the first phase is higher than the current market price of electricity, but the minimum prices in the other phases are far less than the current market price. The analysis indicates that huge advantages of the RCSCPP over coal-fired power plants can be embodied in phases 2–4. In addition, the sensitivity analysis performed in this paper discovers TNPV is very sensitive to changes in the solar electricity price and inflation rate, but responds only slightly to changes in carbon credits price, income tax rate and interest rate of loans. Our analysis predicts that RCSCPPs have very good application prospect. To encourage the development of RCSCPPs, the government should provide subsidy by setting higher electricity price in the first phase, then lower electricity price in the other phases

  12. A Pelagic Paleocene Seouence in the Biga Peninsula Northwest Turkey

    Directory of Open Access Journals (Sweden)

    M. Burak YIKILMAZ

    2002-06-01

    Full Text Available A sequence of pelagic limestone, calciturbidite, debris flow, greywacke, basalt and limestone blocks. up to several hundred metres across, occur west of the town of Biga in northwest Turkey. The pelagic limestones in this sequence, named as the Ballıkaya formation, comprise pelagic foraminifera of Palaeocene age. Neritic limestone of Mid-Eocene age lies unconformably over the Ballıkaya formation. The age and the sedimentary environment of the Ballıkaya formation indicate the presence of a tectonically active deep-sea environment in northwest Turkey during the Palaeocene, and constrain the main Alpide deformation in northwest Turkey to the Late Palaeocene - Early Eocene interval.

  13. Two-layer optimization methodology for wind distributed generation planning considering plug-in electric vehicles uncertainty: A flexible active-reactive power approach

    International Nuclear Information System (INIS)

    Ahmadian, Ali; Sedghi, Mahdi; Aliakbar-Golkar, Masoud; Fowler, Michael; Elkamel, Ali

    2016-01-01

    Highlights: • Flexible active-reactive power control of WDGs is proposed for WDGs planning. • The uncertainty of PEVs effect is considered in WDGs planning. • The wind data is classified in four separate seasons to reach more accurate results. • The PSO algorithm is modified to overcome the complexity of problem. - Abstract: With increasing the penetration of wind power, the voltage regulation becomes a more important problem in active distribution networks. In addition, as an uncertain load Plug-in Electric Vehicles (PEVs) will introduce a new concern in voltage adjustment of future distribution networks. Hence, this paper presents a flexible active-reactive power based Wind Distributed Generation (WDG) planning procedure to address the mentioned challenges. The uncertainties related to WDGs, load demand as well as PEVs load have been handled using the Point Estimate Method (PEM). The distribution network under study is equipped to on-load tap-changer and, as a conventional voltage control component, the Capacitor Banks (CBs) will be planned simultaneously with WDGs. The planning procedure has been considered as a two-loop optimization problem that is solved using Particle Swarm Optimization (PSO) and Tabu Search (TS) algorithms. The tap position and power factor of WDGs are taken into account as stochastic variables with practical limitations. The proposed methodology is applied to a typical distribution network and several scenarios are considered and analyzed. Simulation results show that the standard deviation of power factor depends on PEVs penetration that highlights the capability curve of WDGs. The optimal penetration of wind power increases nonlinearly versus increasing of PEVs connected to the distribution network, however the fixed CBs are required to increase the optimal penetration of WDGs. The proposed Modified PSO (MPSO) is compared with the conventional PSO in numerical studies that show MPSO is more efficient than the conventional

  14. Solar 78 Northwest conference proceedings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-01-01

    Thirty eight papers are included. One was abstracted previously. Separate entries were prepared for thirty-seven. Also included are the conference evaluation summary, Pacific Northwest Solar Energy Association organization information, lists of commercial and non-commercial exhibitors, speakers and stearing committee members, and attendees. (MHR)

  15. Exploring the dynamics of power: a Foucauldian analysis of care planning in learning disabilities services.

    Science.gov (United States)

    Gilbert, Tony

    2003-03-01

    This paper draws upon a study completed in 2000 that focused upon health and welfare provision for people with learning disabilities in one English county. This study drew upon the theoretical insights of Michel Foucault to provide an analysis of the micro politics of care planning. This involved the analysis of text from two sources: the academic literature and interview material gained from a number of professionals working in health and welfare services for people with learning disabilities. Drawing upon this research material, the first part of this paper briefly explores the relationship between policy, professional practice and the people who are the subjects of that practice. The discussion then moves on to consider Foucault's five methodological precautions and the way power produces a localised web of activity that identifies specific targets for management. In this process power draws into the web a range of informal and formal practices that initially lie outside of the web. The discourse produced through the activity surrounding care planning provides the evidence of this flow of power. This discourse then takes on the status of science (truth), which reproduces this activity.

  16. StreamNet Query System: Protected Areas

    Data.gov (United States)

    Pacific States Marine Fisheries Commission — Beginning in 1983, the Northwest Power Planning Council (Council) directed extensive studies of existing habitat and has analyzed alternative means of protection. In...

  17. Current status and future planning of Fukushima Daiichi Nuclear Power Station after Great East Japan earthquake

    International Nuclear Information System (INIS)

    Inouer, Y.

    2012-01-01

    Fukushima Daiichi Nuclear Power Station (NPS) clean-up and decommissioning activities require a lot of R and D and careful project management due to its severity of damage. Inability of access inside the reactor and turbine buildings due to harsh environment results in large uncertainties which make the project planning difficult R and R activities will be conducted in parallel with on-site clean-up and maintenance activities. In order to cope with this unprecedented challenge, the government, laboratories, academicians, vendors, manufacturers, and other partners have joined together to support tokyo electric Power Company, Inc (TEPCO). This paper will summarize the current status and mid-and long-term plan for the clean-up and decommissioning of Units 1 to 4 of Fukushima Daiichi NPS as of March, 2012. (Author) 15 refs.

  18. Patterns and Composition of Road-Killed Wildlife in Northwest Argentina

    Science.gov (United States)

    Cuyckens, Griet An Erica; Mochi, Lucía Sol; Vallejos, María; Perovic, Pablo Gastón; Biganzoli, Fernando

    2016-11-01

    Roads have important effects on wildlife, such as natural habitat fragmentation and degradation and direct killing of fauna, which leads to reductions in wildlife population size. We focused on a principal road in Northwest Argentina to test for the effect of seasonality and landscape features on the composition of road-killed wildlife. We conducted regularly scheduled road trips during the dry and wet seasons. We recorded the presence or absence of a vegetation curtain or hedge along the road. We measured land use by remote sensing in a 500 m buffer along the road. We compared the abundance of animals killed between seasons (dry and wet) for different taxonomic groups (mammals, birds and reptiles) and for different origins (domestic and native). We built linear mixed models to test the effect of landscape features on the abundance of killed animals. Two hundred and ninety-three individuals were killed, belonging to 35 species; 75.8 % were native and 24.2 % domestic species. The majority of animals killed were mid-sized mammals. More animals were killed during the dry season. The most important factors to explain the wildlife road-killing were the season and the proportion of agricultural landscape. The composition of the killed animals changed with the season. The proportion of agricultural landscape incremented the number of killed birds and mammals during both seasons, without affecting reptiles. The ratio of wild to domestic animals killed was dependent on the season. This study sets a precedent as the first in road ecology in Northwest Argentina and should be taken into account for road planning and regulation.

  19. Hinkley Point 'C' power station public inquiry: proof of evidence on emergency planning

    International Nuclear Information System (INIS)

    Western, D.J.

    1988-09-01

    A public inquiry has been set up to examine the planning application made by the Central Electricity Generating Board (CEGB) for the construction of a 1200 MW Pressurized Water Reactor power station at Hinkley Point (Hinkley Point ''C'') in the United Kingdom, adjacent to an existing nuclear power station incorporating Magnox and Advanced Gas Cooled reactors. The CEGB evidence to the Inquiry presented here introduces the concept of the Reference Accident as the basis for emergency arrangements. The description which follows of the emergency arrangements at the Hinkley Point site include: the respective responsibilities and their co-ordination of bodies such as the CEGB, external emergency services and government departments; the site emergency organization; practical aspects of the emergency arrangements; and consideration of the extension of the arrangements to a PWR on the same site. Recent developments in emergency planning, such as those arising out of post Chernobyl reviews and the Sizewell ''B'' PWR Inquiry, are taken into account. The conclusion is reached that soundly based emergency arrangements already exist at Hinkley Point which would require relatively minor changes should the proposed PWR be constructed. (UK)

  20. Environmental Standard Review Plan for the review of license renewal applications for nuclear power plants

    International Nuclear Information System (INIS)

    O'Brien, J.; Kim, T.J.; Reynolds, S.

    1991-08-01

    The Environmental Standard Review Plan for the Review of License Applications for Nuclear Power Plants (ESRP-LR) is to be used by the NRC staff when performing environmental reviews of applications for the renewal of power reactor licenses. The use of the ESRP-LR provides a framework for the staff to determine whether or not environmental issues important to license renewal have been identified and the impacts evaluated and provides acceptance standards to help the reviewers comply with the National Environmental Policy Act

  1. Facility effluent monitoring plan for the 327 Facility

    International Nuclear Information System (INIS)

    1994-11-01

    The 327 Facility [Post-Irradiation Testing Laboratory] provides office and laboratory space for Pacific Northwest Laboratory (PNL) scientific and engineering staff conducting multidisciplinary research in the areas of post-irradiated fuels and structural materials. The facility is designed to accommodate the use of radioactive and hazardous materials in the conduct of these activities. This report summarizes the airborne emissions and liquid effluents and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements

  2. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  3. Interregional power transmission: a component in planning for renewable energy technologies

    International Nuclear Information System (INIS)

    Krueger Nielsen, S.; Soerensen, B.

    2000-01-01

    We discuss the role played by interregional power transmission on the basis of recent scenario work. In a project dealing with long-term planning for energy efficiency and renewable energy in Europe we modelled a scenario for the present 15 EU countries' energy system in 2050. The basis for the scenario is the concept of 'fair pricing' for energy services, meaning that the price of energy should reflect all externalities, but not otherwise be taxed or subsidized. The project assessed resource availability and expected technology price developments over time for a number of energy-related technologies, both on the supply side, the intermediate conversion chain and on the demand side. Among these, transmission technologies play an important role, both in smoothing out renewable energy supplies within the European Union region, and also allowing substantial import of energy from countries outside the EU having a surplus of renewable energy based power. (orig.)

  4. Brazilian nuclear power plants decommissioning plan for a multiple reactor site

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Deiglys B.; Moreira, Joao M.L.; Maiorino, Jose R., E-mail: deiglys.monteiro@ufabc.edu.br, E-mail: joao.moreira@ufabc.edu.br, E-mail: joserubens.maiorino@ufabc.edu.br [Universidade Federal do ABC (CECS/UFABC), Santo Andre, SP (Brazil). Centro de Engenharia, Modelagem e Ciencias Aplicadas. Programa de Pos-Graduacao em Energia e Engenharia da Energia

    2015-07-01

    Actually, Brazil has two operating Nuclear Power Plants and a third one under construction, all at Central Nuclear Almirante Alvaro Alberto - CNAAA. To comply with regulatory aspects the power plants operator, Eletronuclear, must present to Brazilian Nuclear Regulatory Agency, CNEN, a decommissioning plan. Brazilian experience with decommissioning is limited because none of any nuclear reactor at the country was decommissioned. In literature, decommissioning process is well described despite few nuclear power reactors have been decommissioned around the world. Some different approach is desirable for multiple reactors sites, case of CNAAA site. During the decommissioning, a great amount of wastes will be produced and have to be properly managed. Particularly, the construction of Auxiliary Services on the site could be a good choice due to the possibility of reducing costs. The present work intends to present to the Eletronuclear some aspects of the decommissioning concept and decommissioning management, storage and disposal de wastes, based on the available literature, regulatory standards of CNEN and international experience as well as to suggest some solutions to be implemented at CNAAA site before starts the decommissioning project in order to maximize the benefits. (author)

  5. Brazilian nuclear power plants decommissioning plan for a multiple reactor site

    International Nuclear Information System (INIS)

    Monteiro, Deiglys B.; Moreira, Joao M.L.; Maiorino, Jose R.

    2015-01-01

    Actually, Brazil has two operating Nuclear Power Plants and a third one under construction, all at Central Nuclear Almirante Alvaro Alberto - CNAAA. To comply with regulatory aspects the power plants operator, Eletronuclear, must present to Brazilian Nuclear Regulatory Agency, CNEN, a decommissioning plan. Brazilian experience with decommissioning is limited because none of any nuclear reactor at the country was decommissioned. In literature, decommissioning process is well described despite few nuclear power reactors have been decommissioned around the world. Some different approach is desirable for multiple reactors sites, case of CNAAA site. During the decommissioning, a great amount of wastes will be produced and have to be properly managed. Particularly, the construction of Auxiliary Services on the site could be a good choice due to the possibility of reducing costs. The present work intends to present to the Eletronuclear some aspects of the decommissioning concept and decommissioning management, storage and disposal de wastes, based on the available literature, regulatory standards of CNEN and international experience as well as to suggest some solutions to be implemented at CNAAA site before starts the decommissioning project in order to maximize the benefits. (author)

  6. Market redesign and regulatory change : how companies doing business in Alberta's power markets will be affected

    International Nuclear Information System (INIS)

    Runge, C.

    2003-01-01

    The Power Pool of Alberta (PPA) began its operations in 1996 based on a model with a single price set based on day ahead offers/bids and real time dispatch. The Electric Utilities Act was amended in 1998 and direct sales were permitted in 1999. The Power Purchase Arrangement Auction was implemented in 2000. Significant events took place in 2001, including: (1) retail competition, (2) PPAs began operations, (3) restrictions on direct sales were removed, (4) forward exchange operation, and (5) ancillary services market. In 2002, the Market Achievement Plan II was implemented and government industry structure was reviewed. There are several considerations regarding market redesign, such as day ahead market, capacity market, congestion management, and Northwest Regional Transmission Organization (RTO West). The role of the International Standard Organization (ISO) was discussed, with reference to the Independent System Operator, Independent Market Operator, and Transmission and Market Planner. Redesign must involve all participants and include informed, phased in changes

  7. Nuclear power infrastructure and planning

    International Nuclear Information System (INIS)

    2005-01-01

    There are several stages in the process of introducing nuclear power in a country. These include feasibility studies; technology evaluation; request for proposals and proposal evaluation; project and contracts development and financing; supply, construction, and commissioning; and finally operation. The IAEA is developing guidance directed to provide criteria for assessing the minimum infrastructure necessary for: a) a host country to consider when engaging in the implementation of nuclear power, or b) a supplier country to consider when assessing that the recipient country would be in an acceptable condition to begin the implementation of nuclear power. There are Member States that may be denied the benefits of nuclear energy if the infrastructure requirements are too large or onerous for the national economy. However if co-operation could be achieved, the infrastructure burden could be shared and economic benefits gained by several countries acting jointly. The IAEA is developing guidance on the potential for sharing of nuclear power infrastructure among countries adopting or extending nuclear power programme

  8. Estimates of emissions of SO sub 2 , NO sub x , HCl and NH sub 3 from Greater Manchester and the North-West of England

    Energy Technology Data Exchange (ETDEWEB)

    Lee, D.S.; Longhurst, J.W.S.

    1990-11-01

    Estimates of emissions of SO{sub 2}, NO{sub x}, HCl and NH{sub 3} have been made for Greater Manchester and the North West of England. These estimates were made using data on power generation, fuel useage, animal and human population statistics. A large fossil fuel fired power station is the largest known point source for emissions of SO{sub 2}, NO{sub x} and HCl. However, emissions from motor vehicles make the largest contribution to NO{sub x} emissions in the North-West as a whole. The largest contribution to NH{sub 3} emissions in the North-West is from cattle. However in the Metropolitan Counties of Merseyside and Greater Manchester, it has been calculated that humans could contribute 73% and 81%, respectively, to the emissions of NH{sub 3}. The uncertainties in the methodologies used are highlighted, and where possible, recommendations made as to how future emissions estimates might be improved. 33 refs., 9 figs., 7 tabs.

  9. Production Planning with Respect to Uncertainties. Simulator Based Production Planning of Average Sized Combined Heat and Power Production Plants; Produktionsplanering under osaekerhet. Simulatorbaserad produktionsplanering av medelstora kraftvaermeanlaeggningar

    Energy Technology Data Exchange (ETDEWEB)

    Haeggstaahl, Daniel [Maelardalen Univ., Vaesteraas (Sweden); Dotzauer, Erik [AB Fortum, Stockholm (Sweden)

    2004-12-01

    Production planning in Combined Heat and Power (CHP) systems is considered. The focus is on development and use of mathematical models and methods. Different aspects on production planning are discussed, including weather and load predictions. Questions relevant on the different planning horizons are illuminated. The main purpose with short-term (one week) planning is to decide when to start and stop the production units, and to decide how to use the heat storage. The main conclusion from the outline of pros and cons of commercial planning software are that several are using Mixed Integer Programming (MIP). In that sense they are similar. Building a production planning model means that the planning problem is formulated as a mathematical optimization problem. The accuracy of the input data determines the practical detail level of the model. Two alternatives to the methods used in today's commercial programs are proposed: stochastic optimization and simulator-based optimization. The basic concepts of mathematical optimization are outlined. A simulator-based model for short-term planning is developed. The purpose is to minimize the production costs, depending on the heat demand in the district heating system, prices of electricity and fuels, emission taxes and fees, etc. The problem is simplified by not including any time-linking conditions. The process model is developed in IPSEpro, a heat and mass-balance software from SimTech Simulation Technology. TOMLAB, an optimization toolbox in MATLAB, is used as optimizer. Three different solvers are applied: glcFast, glcCluster and SNOPT. The link between TOMLAB and IPSEpro is accomplished using the Microsoft COM technology. MATLAB is the automation client and contains the control of IPSEpro and TOMLAB. The simulator-based model is applied to the CHP plant in Eskilstuna. Two days are chosen and analyzed. The optimized production is compared to the measured. A sensitivity analysis on how variations in outdoor

  10. Empirical Information Metrics for Prediction Power and Experiment Planning

    Directory of Open Access Journals (Sweden)

    Christopher Lee

    2011-01-01

    Full Text Available In principle, information theory could provide useful metrics for statistical inference. In practice this is impeded by divergent assumptions: Information theory assumes the joint distribution of variables of interest is known, whereas in statistical inference it is hidden and is the goal of inference. To integrate these approaches we note a common theme they share, namely the measurement of prediction power. We generalize this concept as an information metric, subject to several requirements: Calculation of the metric must be objective or model-free; unbiased; convergent; probabilistically bounded; and low in computational complexity. Unfortunately, widely used model selection metrics such as Maximum Likelihood, the Akaike Information Criterion and Bayesian Information Criterion do not necessarily meet all these requirements. We define four distinct empirical information metrics measured via sampling, with explicit Law of Large Numbers convergence guarantees, which meet these requirements: Ie, the empirical information, a measure of average prediction power; Ib, the overfitting bias information, which measures selection bias in the modeling procedure; Ip, the potential information, which measures the total remaining information in the observations not yet discovered by the model; and Im, the model information, which measures the model’s extrapolation prediction power. Finally, we show that Ip + Ie, Ip + Im, and Ie — Im are fixed constants for a given observed dataset (i.e. prediction target, independent of the model, and thus represent a fundamental subdivision of the total information contained in the observations. We discuss the application of these metrics to modeling and experiment planning.    

  11. Final Technical Report - Kotzebue Wind Power Project - Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  12. Integrated resource planning in the power sector and economy-wide changes in environmental emissions

    International Nuclear Information System (INIS)

    Shrestha, Ram M.; Marpaung, Charles O.P.

    2006-01-01

    This paper analyzes the roles of key factors (i.e., changes in structure, fuel mix and final demand) on total economy-wide changes in CO 2 , SO 2 and NO x emissions when power sector development follows the integrated resource planning (IRP) approach instead of traditional supply-based electricity planning (TEP). It also considers the rebound effect (RE) of energy efficiency improvements in the demand side and analyzes the sensitivity of the results to variations in the values of the RE. A framework is developed to decompose the total economy-wide change in the emission of a pollutant into four major components, i.e., structural change-, fuel mix- , final demand- and joint-effects. The final demand effect is further decomposed into three categories, i.e., construction of power plants, electricity final demand and final demand related to electricity using equipments. The factor decomposition framework is then applied in the case of the power sector in Indonesia. A key finding in the case of Indonesia is that in the absence of the RE, there would be total economy-wide reductions in CO 2 , SO 2 and NO x emissions of 431, 1.6 and 1.3 million tons respectively during the planning horizon of 2006-2025 under IRP as compared to that under TEP. The decomposition analysis shows that the final demand effect would account for 38% of the total CO 2 emission reduction followed by the structural change effect (35.1%) and fuel mix effect (27.6%) while the joint effect is negligible. The study also shows that economy-wide CO 2 emission reduction due to IRP considering the RE of 45% would be 241 million tons as compared to 333 million tons when the RE is 25%

  13. Integrated resource planning in the power sector and economy-wide changes in environmental emissions

    International Nuclear Information System (INIS)

    Shrestha, Ram M.; Marpaung, Charles O.P.

    2006-01-01

    This paper analyzes the roles of key factors (i.e., changes in structure, fuel mix and final demand) on total economy-wide changes in CO 2 , SO 2 and NO x emissions when power sector development follows the integrated resource planning (IRP) approach instead of traditional supply-based electricity planning (TEP). It also considers the rebound effect (RE) of energy efficiency improvements in the demand side and analyzes the sensitivity of the results to variations in the values of the RE. A framework is developed to decompose the total economy-wide change in the emission of a pollutant into four major components, i.e., structural change-, fuel mix- , final demand- and joint-effects. The final demand effect is further decomposed into three categories, i.e., construction of power plants, electricity final demand and final demand related to electricity using equipment. The factor decomposition framework is then applied in the case of the power sector in Indonesia. A key finding in the case of Indonesia is that in the absence of the RE, there would be total economy-wide reductions in CO 2 , SO 2 and NO x emissions of 431, 1.6 and 1.3 million tons respectively during the planning horizon of 2006-2025 under IRP as compared to that under TEP. The decomposition analysis shows that the final demand effect would account for 38% of the total CO 2 emission reduction followed by the structural change effect (35.1%) and fuel mix effect (27.6%) while the joint effect is negligible. The study also shows that economy-wide CO 2 emission reduction due to IRP considering the RE of 45% would be 241 million tons as compared to 333 million tons when the RE is 25%. (Author)

  14. Evaluating the impacts of slope aspect on forest dynamic succession in Northwest China based on FAREAST model

    Science.gov (United States)

    Hu, Shanshan; Ma, Jianyong; Shugart, Herman H.; Yan, Xiaodong

    2018-03-01

    Mountain forests provide the main water resources and lumber for Northwest China. The understanding of the differences in forests growing among individual slope aspects in mountainous regions is of great significance to the wise management and planning of these natural systems. The aim of this study was to investigate the impacts of slope aspect on forest dynamic succession in Northwest China by using the dynamic forest succession model (FAREAST). First, the simulated forest composition and vertical forest zonation produced by the model were compared against recorded data in three sub-regions of the Altai Mountains. The FAREAST model accurately reproduced the vertical zonation, forest composition, growth curves of the dominant species (Larix sibirica), and forest biomass in the Altai Mountains. Transitions along the forest zones of the Altai Mountains averaged about a 400 m difference between the northern and southern sites. Biomass for forests on north-facing slopes were 11.0, 15.3 and 55.9 t C ha-1 higher than for south-facing slopes in the Northeast, Central and Southeast sub-regions, respectively. Second, our analyses showed that the FAREAST model can be used to predict dynamic forest succession in Northwest China under the influence of slope and aspect. In the Altai Mountains, the north-facing slopes supported the best forest growth, followed by the west- and east-facing slopes. South-facing slopes consistently exhibited the lowest growth, biomass storage and forest diversity.

  15. THE NATURAL MOVEMENT OF POPULATION IN THE NORTH-WEST REGION OF ROMANIA

    Directory of Open Access Journals (Sweden)

    MANUELA-DORA ORBOI

    2009-05-01

    Full Text Available From the perspective of human development indicators during the past 15 years, Region North-West has undergone a series of negative processes, which are the most significant demographic decline due to negative natural growth and increased migration of people, especially those assets. Region North-West faces a negative demographic trend, with life expectancy of 71.38 years, the national average (72.22 years with high external migration, especially of highly qualified workforce. Analysis of employment trends of population in Region North-West shows a downward trend and projections for the development for years emphasized the decrease in employment. Estimates on the evolution of the population in Region North-West during 2005-2013 reveals a total population decreased by 4.2%.

  16. Power Distribution System Planning Evaluation by a Fuzzy Multi-Criteria Group Decision Support System

    Directory of Open Access Journals (Sweden)

    Tiefeng Zhang

    2010-10-01

    Full Text Available The evaluation of solutions is an important phase in power distribution system planning (PDSP which allows issues such as quality of supply, cost, social service and environmental implications to be considered and usually involves the judgments of a group of experts. The planning problem is thus suitable for the multi-criteria group decision-making (MCGDM method. The evaluation process and evaluation criteria often involve uncertainties incorporated in quantitative analysis with crisp values and qualitative judgments with linguistic terms; therefore, fuzzy sets techniques are applied in this study. This paper proposes a fuzzy multi-criteria group decision-making (FMCGDM method for PDSP evaluation and applies a fuzzy multi-criteria group decision support system (FMCGDSS to support the evaluation task. We introduce a PDSP evaluation model, which has evaluation criteria within three levels, based on the characteristics of a power distribution system. A case-based example is performed on a test distribution network and demonstrates how all the problems in a PDSP evaluation are addressed using FMCGDSS. The results are acceptable to expert evaluators.

  17. Northwest National Marine Renewable Energy Center

    Energy Technology Data Exchange (ETDEWEB)

    Batten, Belinda [Oregon State Univ., Corvallis, OR (United States); Polagye, Brian [Univ. of Washington, Seattle, WA (United States); LiVecchi, Al [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-06-30

    In 2008, the US Department of Energy’s (DOE) Wind and Water Power Program issued a funding opportunity announcement to establish university-led National Marine Renewable Energy Centers. Oregon State University and the University of Washington combined their capabilities in wave and tidal energy to establish the Northwest National Marine Renewable Energy Center, or NNMREC. NNMREC’s scope included research and testing in the following topic areas: • Advanced Wave Forecasting Technologies; • Device and Array Optimization; • Integrated and Standardized Test Facility Development; • Investigate the Compatibility of Marine Energy Technologies with Environment, Fisheries and other Marine Resources; • Increased Reliability and Survivability of Marine Energy Systems; • Collaboration/Optimization with Marine Renewable and Other Renewable Energy Resources. To support the last topic, the National Renewable Energy Laboratory (NREL) was brought onto the team, particularly to assist with testing protocols, grid integration, and testing instrumentation. NNMREC’s mission is to facilitate the development of marine energy technology, to inform regulatory and policy decisions, and to close key gaps in scientific understanding with a focus on workforce development. In this, NNMREC achieves DOE’s goals and objectives and remains aligned with the research and educational mission of universities. In 2012, DOE provided NNMREC an opportunity to propose an additional effort to begin work on a utility scale, grid connected wave energy test facility. That project, initially referred to as the Pacific Marine Energy Center, is now referred to as the Pacific Marine Energy Center South Energy Test Site (PMEC-SETS) and involves work directly toward establishing the facility, which will be in Newport Oregon, as well as supporting instrumentation for wave energy converter testing. This report contains a breakdown per subtask of the funded project. Under each subtask, the following

  18. Paducah Gaseous Diffusion Plant Northwest Plume interceptor system evaluation

    International Nuclear Information System (INIS)

    Laase, A.D.; Clausen, J.L.

    1998-01-01

    The Paducah Gaseous Diffusion Plant (PGDP) recently installed an interceptor system consisting of four wells, evenly divided between two well fields, to contain the Northwest Plume. As stated in the Northwest Plume Record of Decision (ROD), groundwater will be pumped at a rate to reduce further contamination and initiate control of the northwest contaminant plume. The objective of this evaluation was to determine the optimum (minimal) well field pumping rates required for plume hotspot containment. Plume hotspot, as defined in the Northwest Plume ROD and throughout this report, is that portion of the plume with trichloroethene (TCE) concentrations greater than 1,000 microg/L. An existing 3-dimensional groundwater model was modified and used to perform capture zone analyses of the north and south interceptor system well fields. Model results suggest that the plume hotspot is not contained at the system design pumping rate of 100 gallons per minute (gal/min) per well field. Rather, the modeling determined that north and south well field pumping rates of 400 and 150 gal/min, respectively, are necessary for plume hotspot containment. The difference between the design and optimal pumping rates required for containment can be attributed to the discovery of a highly transmissive zone in the vicinity of the two well fields

  19. Aerocapacitor commercialization plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-12

    The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

  20. Emergency planning requirements and short-term countermeasures for commercial nuclear power plants in the United States

    International Nuclear Information System (INIS)

    Kantor, F.; Hogan, R.; Mohseni, A.

    1995-01-01

    Since the accident at the Three Mile Island Unit, the United States Nuclear Regulatory's Commission (NRC's) emergency planning regulations are now considered and an important part of the regulatory framework for protecting the public health and safety. Many aspects of the countermeasures are presented: Emergency Planning Zones (EPZ), off-Site emergency planning and preparedness, responsibilities of nuclear power plants operators and states and local government. Finally, protective action recommendations are given as well as the federal response to an emergency. The authors noted that the use of potassium iodide is not considered as an effective countermeasure for the public protection in the US. (TEC). 1 fig