WorldWideScience

Sample records for narragansett bay commission

  1. 77 FR 43514 - Anchorage Regulations; Narragansett Bay and Rhode Island Sound, RI

    2012-07-25

    ...-AA01 Anchorage Regulations; Narragansett Bay and Rhode Island Sound, RI AGENCY: Coast Guard, DHS... Narragansett Bay, Rhode Island, and adding an offshore anchorage in Rhode Island Sound south of Brenton Point... rulemaking (NPRM) entitled ``Anchorage Regulations; Narragansett Bay and Rhode Island Sound, RI,'' in the...

  2. 77 FR 28253 - Safety Zone; America's Cup World Series, East Passage, Narragansett Bay, RI

    2012-05-14

    ...-AA00 Safety Zone; America's Cup World Series, East Passage, Narragansett Bay, RI AGENCY: Coast Guard... navigable waters of the East Passage, Narragansett Bay, Rhode Island, during the America's Cup World Series... rulemaking (NPRM) entitled ``Safety Zones; America's Cup World Series, East Passage, Narragansett Bay, RI...

  3. The changing ecology of Narragansett Bay as told by habitat

    Narragansett Bay has changed in many ways over millennia due to natural and human forces, and the rate of this change increased greatly after European colonization. We evaluated distributions of three stressors and four habitats in eight subdivisions of the Bay for aspects of ec...

  4. Urban Marine Habitat Use by Waterbirds in Narragansett Bay

    We examined patterns of habitat use by waterbirds (waterfowl, shorebirds, and wading birds) at a series of urban and non-urban marine habitats in Narragansett Bay during 2005-2007. Average waterbird abundance at urban sites was significantly higher than at rural sites (304 ± 59.7...

  5. 46 CFR 7.20 - Nantucket Sound, Vineyard Sound, Buzzards Bay, Narragansett Bay, MA, Block Island Sound and...

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Nantucket Sound, Vineyard Sound, Buzzards Bay, Narragansett Bay, MA, Block Island Sound and easterly entrance to Long Island Sound, NY. 7.20 Section 7.20... Atlantic Coast § 7.20 Nantucket Sound, Vineyard Sound, Buzzards Bay, Narragansett Bay, MA, Block Island...

  6. 77 FR 39395 - Special Local Regulations; Ocean State Tall Ships Festival 2012, Narragansett Bay, RI

    2012-07-03

    ...-AA08 Special Local Regulations; Ocean State Tall Ships Festival 2012, Narragansett Bay, RI AGENCY... Tall Ships Festival 2012. DATES: This rule is effective from July 6, 2012 until July 10, 2012... ``Special Local Regulations: Ocean State Tall Ships Festival 2012, Narragansett Bay, RI'' in the Federal...

  7. 77 FR 7025 - Safety Zones; America's Cup World Series, East Passage, Narragansett Bay, RI

    2012-02-10

    ...-AA00 Safety Zones; America's Cup World Series, East Passage, Narragansett Bay, RI AGENCY: Coast Guard... the America's Cup World Series sailing vessel racing event. This safety zone is intended to safeguard...'s Cup-class races on the waters of the East Passage, Narragansett Bay, Rhode Island. Vessels will be...

  8. 75 FR 15343 - Regulated Navigation Area: Narragansett Bay, RI and Mount Hope Bay, RI and MA, Including the...

    2010-03-29

    ...: Narragansett Bay, RI and Mount Hope Bay, RI and MA, Including the Providence River and Taunton River AGENCY... River and Mount Hope Bay in the vicinity of the two Brightman Street bridges have not been adopted and... Island and Mt. Hope Bay, MA.'' The notice was prompted primarily by two events: (1) The U.S. Army Corps...

  9. Temporal and spatial behavior of pharmaceuticals in Narragansett Bay, Rhode Island, United States.

    The behavior and fate of pharmaceutical ingredients in coastal marine ecosystems are not well understood. To address this, the spatial and temporal distribution of 15 high-volume pharmaceuticals were measured over a 1-yr period in Narragansett Bay (RI, USA) to elucidate factors a...

  10. 77 FR 16974 - Special Local Regulations; Ocean State Tall Ships Festival 2012, Narragansett Bay, RI

    2012-03-23

    ...-AA08 Special Local Regulations; Ocean State Tall Ships Festival 2012, Narragansett Bay, RI AGENCY... Island, for the Ocean State Tall Ships Festival 2012. This action is necessary to provide for the safety..., during the Ocean State Tall Ships Festival on July 6-9, 2012. These temporary special local regulations...

  11. Trend analysis of stressors and ecological responses, particularly nutrients, in the Narragansett Bay Watershed.

    Current and historic impacts of nitrogen on water quality were evaluated and relationships between nutrients and ecosystem structure and function were developed for Narragansett Bay, RI. Land use land cover change analysis from 1985 thru 2005 resulted in a 7% increase in urban la...

  12. 76 FR 15246 - Anchorage Regulations; Narragansett Bay and Rhode Island Sound, RI

    2011-03-21

    ...-AA01 Anchorage Regulations; Narragansett Bay and Rhode Island Sound, RI AGENCY: Coast Guard, DHS... Rhode Island Sound south of Brenton Point, Rhode Island, for use by vessels waiting to enter... Sound that under current informal practice is routinely used by mariners as an anchorage while waiting...

  13. Changes to habitats over time in Narragansett Bay and setting management targets using BCG approaches

    We compare changes in the distributions of seagrass, benthic, macroalgal, saltmarsh, and shellfish habitat in Narragansett Bay (U.S.A.) since the 1700s to changes in stressors and management decisions over the same time period, and describe a method that management programs can u...

  14. Quantifying contributions to light attenuation in estuaries and coastal embayments: Application to Narragansett Bay, Rhode Island

    In Narragansett Bay, light attenuation by total suspended sediments (TSS), colored dissolved organic matter (CDOM), and phytoplankton chlorophyll-a (chl-a) pigment is 129, 97, and 70%, respectively, of that by pure seawater. Spatial distribution of light attenuation indicates hig...

  15. 33 CFR 165.121 - Safety and Security Zones: High Interest Vessels, Narragansett Bay, Rhode Island.

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Safety and Security Zones: High... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PORTS AND WATERWAYS SAFETY REGULATED NAVIGATION... Guard District § 165.121 Safety and Security Zones: High Interest Vessels, Narragansett Bay, Rhode...

  16. Contribution of chronic petroleum inputs to Narragansett Bay and Rhode Island Sound sediments

    Van Vleet, E S; Quin, J G

    1978-05-01

    Sediment cores from Narragansett Bay and Rhode Island Sound have been analyzed for petroleum hydrocarbons and compared with a relatively unpolluted sediment core from the Gulf of Maine. The sediments were analyzed for unbound hydrocarbons, hydrocarbons bound or closely associated with humic substances, and residual hydrocarbons bound or closely associated with the clay mineral or kerogen matrix. Results indicated that in general 90-100% of the hydrocarbons were in the unbound form and could be easily extracted with organic solvents. The petroleum hydrocarbons decreased with depth at all stations. Biogenic hydrocarbons (nC/sub 25/, nC/sub 27/, nC/sub 29/, and nC/sub 31/) made up an increasingly greater percentage of the total with increasing depth. The hydrocarbons in the Narragansett Bay sediments and near surface Rhode Island Sound sediments strongly resembled the hydrocarbons previously reported for the Providence River and upper Narragansett Bay. These petroleum-like hydrocarbons were shown to be largely introduced to the river and bay through chronic inputs from a municipal wastewater treatment plant. These hydrocarbons then undergo sedimentation throughout the entire bay and into Rhode Island Sound. Preliminary calculations indicate that over 0.2 million t (tonne) of petroleum hydrocarbons may be transported to the marine environment annually from municipal treatment plants. Most of these hydrocarbons appear to accumulate in estuarine and coastal sediments.

  17. The history of metals pollution in Narragansett Bay as recorded by salt-marsh sediments

    Bricker, S.B.

    1990-01-01

    Sediment cores from 5 salt marshes from the head to the mouth of Narragansett Bay and an additional core from a lagoon on Block Island Sound were analyzed for 210 Pb and for Fe, Mn, Cu, Pb, Cr, Zn, Ag, and Ni in order to examine the long-term variation of metal inputs to Narragansett Bay. The 210 Pb results were used to determine accretion rates for each core. Distributions of Fe and Mn were used as indicators of chemical conditions of sediment cores and Cu, Pb, Cr, Zn, Ag, and Ni distributions with time were compared with known or estimated source inputs to examine the long-term variation of pollutant metal inputs to Narragansett Bay. At one location, duplicate cores were sampled to look at variability within a marsh. At another location, a high marsh, receiving predominantly atmospheric inputs and a low marsh, receiving waterborne and atmospheric inputs, were sampled so that atmospheric and tidal contributions could be determined. A comparison was made of the distributions of metals in bay cores and in the lagoon core. All the Rhode Island marshes accrete at rates equal to or greater than the local rise in sea level. Based on the 210 Pb chronologies, pollutant metals began to increase in the mid to late 1800s, corresponding to coal burning emissions to the atmosphere. Steeper increases in the 1900s reflect industrial and sewage discharges. Maximum concentrations were reached in the 1950s and have declined almost continuously since then. Observed reductions were attributable to implementation of and improvements to sewage treatment, and controls on atmospheric emissions

  18. Population genetic analyses are consistent with the introduction of Ceramium secundatum (Ceramiaceae, Rhodophyta) to Narragansett Bay, Rhode Island, USA.

    Bruce, Meghann R; Saunders, Gary W

    2015-11-01

    During ongoing DNA barcode (COI-5P) surveys of the macroalgal flora along the northwest Atlantic coast, we discovered a population of Ceramium secundatum in Narragansett Bay, Rhode Island, USA. This species is regarded as common and widespread in the northeast Atlantic, ranging from Norway to Morocco, but until now has not been reported from the western Atlantic. Several lines of evidence suggest that C. secundatum may be introduced to Narragansett Bay: (1) despite extensive collecting, specimens have only been obtained from a limited geographic range in the northwest Atlantic; (2) three other nonindigenous seaweed species are reportedly introduced in this region, which is thought to be a consequence of shipping; and (3) this species is introduced to South Africa and New Zealand. To investigate this suspected introduction, we applied population genetic analyses (using the cox2-3 spacer) to compare the Narragansett Bay C. secundatum population to native populations in the Republic of Ireland and the United Kingdom. Collectively, analyses of biogeographical and molecular data indicate that C. secundatum is likely introduced to Narragansett Bay. The implications of this discovery are discussed.

  19. Recovery of Data from the Narragansett Bay Project, 1985-1992: User's Manual and CD-ROM

    Data from the 1985-1992 era of the Narragansett Bay Project, an estuary of the National Estuary Program, were recovered from numerous storage media, updated to modern software, and burned to CD-ROM. The data will be used by, among others, EPA researchers working on long-term tren...

  20. A Database of Historical Benthic Invertebrate Biodiversity Spanning 182 Years in Narragansett Bay (Rhode Island and Massachusetts)_Data_ v1

    U.S. Environmental Protection Agency — To examine biodiversity trends over time, a master list was compiled of all benthic invertebrate species collected from the Narragansett Bay beginning with Totten’s...

  1. The geochemistry of coprostanol in waters and surface sediments from Narragansett Bay

    LeBlanc, Lawrence A.; Latimer, James S.; Ellis, John T.; Quinn, James G.

    1992-05-01

    A geochemical study of coprostanol (5β-Cholestan-3β-ol) was undertaken, to examine the transport and fate of a compound of moderate polarity and reactivity in the marine environment, and also because of the interest in coprostanol for use as a sewage tracer. During 1985-86, 20 sites in Narragansett Bay, including the major point sources and rivers discharging into the bay estuary, were sampled at four different times. In addition, surface sediments from 26 stations in the bay were collected. The large number and diversity of samples allowed for an assessment of major inputs of sewage into the bay as well as the recent fate of sewage-derived particles in surface sediments. Results from the study revealed that 50% of the total particulate coprostanol entering the bay was discharged into the Providence River, primarily due to inputs from the wastewater treatment facility (WWTF) at Fields Point, as well as input from the Pawtuxet and Blackstone Rivers. In the lower bay, the Newport WWTF was the largest single source of coprostanol (37% of the total particulate coprostanol) to the bay. Effluent concentrations of coprostanol from secondary WWTFs were consistently lower than those of primary treatment facilities, demonstrating the usefulness of corporstanol as an indicator of treatment plant efficiency. The distribution of coprostanol in waters and surface sediments showed a gradient of decreasing concentration downbay. When coprostanol concentrations in surface sediments were normalized to organic carbon (OC) concentrations, elevated levels were seen only in the Providence River, with a more or less even distribution throughout the rest of the bay. Results also suggest that coprostanol degrades more rapidly in the water column compared to the petroleum hydrocarbons (PHCs), polychlorinated biphenyls (PCBs) and polycyclic aromatic hydrocarbons (PAHs), however, it is relatively stable once it is buried in the sediments. Coprostanol concentrations in waters (0·02-0·22

  2. Seasonality of community structure and carbon flow in Narragansett Bay sediments

    Rudnick, D.T.

    1984-01-01

    Seasonal patterns of benthic community dynamics and the pathways of detrital decomposition in Narragansett Bay were examined. Benthic meiofauna and macrofauna exhibited a pronounced seasonality, with peak abundances in the late spring and minima in the late summer. This pattern was most pronounced for surface dwelling fauna, particularly harpacticoid copepods. These results were attributed to the seasonality of detrital inputs to the sediment and the fate of these inputs. A six month study in which 14 C-sodium bicarbonate was added to a large (13 m 3 ) microcosm enabled the author to observe pathways of carbon flow. Half of the labeled organic carbon that was deposited on the sediment during the winter and spring was found in the sediment in July. At least 20 gC/m 2 had accumulated since December. Within the sediment, the existence of two discrete food webs was distinguished by measurement of faunal specific activity. Surface fauna, dominated by the meiofauna, exclusively assimilate fresh (labeled) organics, while subsurface fauna (meiofauna and macrofauna) predominantly assimilated older, non-labeled organics for the duration of the study. Only the subsurface food web had access to the storage of buried detritus. While there was a surplus of detritus for both food webs during the winter and spring, the authors expect that benthic respiration rates exceed organic deposition rates during the summer. Detrital storage may be critical for the survival of the fauna through the summer

  3. Sea-floor morphology and sedimentary environments in southern Narragansett Bay, Rhode Island

    McMullen, Katherine Y.; Poppe, Lawrence J.; Blackwood, Dann S.; Nardi, Matthew J.; Andring, Matthew A.

    2015-09-09

    Multibeam echosounder data collected by the National Oceanic and Atmospheric Administration along with sediment samples and still and video photography of the sea floor collected by the U.S. Geological Survey were used to interpret sea-floor features and sedimentary environments in southern Narragansett Bay, Rhode Island, as part of a long-term effort to map the sea floor along the northeastern coast of the United States. Sea-floor features include rocky areas and scour depressions in high-energy environments characterized by erosion or nondeposition, and sand waves and megaripples in environments characterized by coarse-grained bedload transport. Two shipwrecks are also located in the study area. Much of the sea floor is relatively featureless within the resolution of the multibeam data; sedimentary environments in these areas are characterized by processes associated with sorting and reworking. This report releases bathymetric data from the multibeam echosounder, grain-size analyses of sediment samples, and photographs of the sea floor and interpretations of the sea-floor features and sedimentary environments. It provides base maps that can be used for resource management and studies of topics such as benthic ecology, contaminant inventories, and sediment transport.

  4. Lipid and DNA biomarker analyses of Narragansett Bay Sediments: Evaluating the UK'37 proxy in an Estuarine Environment

    George, S. E.; Herbert, T.; Amaral-Zettler, L. A.; Richter, N.

    2017-12-01

    Long chain polyunsaturated alkenone (LCA) lipid biomarkers produced by haptophyte phytoplankton species within the Order Isochrysidales (Phylum Haptophyta) have proven exceptionally useful in paleotemperature studies by means of the Uk'37 and Uk37 indices. Two closely-related Group III haptophytes, Emiliania huxleyi and Gephyrocapsa oceanica are the primary alkenone synthesizers in the modern ocean, while freshwater systems host the distinct Group I phylotype, sometimes called the Greenland phylotype, in reference to the location of its original discovery. Group I haptophytes produce large quantities of the distinct C37:4 ketone, which acts as a chemical `fingerprint' in sediments. The utility of alkenones as a paleotemperature proxy in estuarine environments has remained largely untested, representing an under-utilized opportunity to construct high-resolution paleotemperature records from environments at the intersection of fluvial and marine systems. This uncertainty is due, in part, to the presence of multiple haptophyte groups in estuaries, resulting in a mixed alkenone signature. To determine the community composition of alkenone-producing haptophytes within Narragansett Bay, four geographically separated cores from within the Bay were analyzed for alkenones as well as haptophyte rRNA biomarker gene presence. Haptophyte rRNA genes (small and large subunit) were recovered from surface and near-subsurface samples, and in conjunction with alkenone profiles, reveal recent haptophyte community structure and alkenone production regimes throughout the Bay. A surprising result is the recovery of rRNA biomarker genes with a 100% match to the open-ocean alkenone producer E. huxleyi in locations away from large fresh water inputs to the Bay. Results of these analyses elucidate the effect of salinity and nutrient dynamics on alkenone-producing haptophyte communities and enhance applicability of long chain polyunsaturated alkenones as lipid biomarkers in estuarine

  5. Coincident patterns of waste water suspended solids reduction, water transparency increase and chlorophyll decline in Narragansett Bay.

    Borkman, David G; Smayda, Theodore J

    2016-06-15

    Dramatic changes occurred in Narragansett Bay during the 1980s: water clarity increased, while phytoplankton abundance and chlorophyll concentration decreased. We examine how changes in total suspended solids (TSS) loading from wastewater treatment plants may have influenced this decline in phytoplankton chlorophyll. TSS loading, light and phytoplankton observations were compiled and a light- and temperature-dependent Skeletonema-based phytoplankton growth model was applied to evaluate chlorophyll supported by TSS nitrogen during 1983-1995. TSS loading declined 75% from ~0.60×10(6)kgmonth(-1) to ~0.15×10(6)kgmonth(-1) during 1983-1995. Model results indicate that nitrogen reduction related to TSS reduction was minor and explained a small fraction (~15%) of the long-term chlorophyll decline. The decline in NBay TSS loading appears to have increased water clarity and in situ irradiance and contributed to the long-term chlorophyll decline by inducing a physiological response of a ~20% reduction in chlorophyll per cell. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. Developing a wintering waterfowl community baseline for environmental monitoring of Narragansett Bay, Rhode Island [version 3; referees: 1 approved, 2 approved with reservations

    Betty J. Kreakie

    2015-12-01

    Full Text Available In 2004, the Atlantic Ecology Division of the US Environmental Protection Agency’s Office of Research and Development began an annual winter waterfowl survey of Rhode Island’s Narragansett Bay. Herein, we explore the survey data gathered from 2004 to 2011 in order to establish a benchmark understanding of our waterfowl communities and to establish a statistical framework for future environmental monitoring. The abundance and diversity of wintering waterfowl were relatively stable during the initial years of this survey, except in 2010 when there was a large spike in abundance and a reciprocal fall in diversity. There was no significant change in ranked abundance of most waterfowl species, with only Bufflehead (Bucephala albeola and Hooded Merganser (Lophodytes cucllatus showing a slight yet significant upward trend during the course of our survey period. Nonmetric multidimensional scaling (NMDS was used to examine the community structure of wintering waterfowl. The results of the NMDS indicate that there is a spatial structure to the waterfowl communities of Narragansett Bay and this structure has remained relatively stable since the survey began. Our NMDS analysis helps to solidify what is known anecdotally about the bay’s waterfowl ecology, and provides a formalized benchmark for long-term monitoring of Narragansett Bay’s waterfowl communities. Birds, including waterfowl, are preferred bioindicators and we propose using our multivariate approach to monitor the future health of the bay. While this research focuses on a specific area of New England, these methods can be easily applied to novel areas of concern and provide a straightforward nonparametric approach to community-level monitoring. The methods provide a statistic test to examine potential drivers of community turnover and well-suited visualization tools.

  7. Diagnosis of potential stressors adversely affecting benthic invertebrate communities in Greenwich Bay, Rhode Island, USA

    Greenwich Bay is an urbanized embayment of Narragansett Bay potentially impacted by multiple stressors. The present study identified the important stressors affecting Greenwich Bay benthic fauna. First, existing data and information were used to confirm that the waterbody was imp...

  8. Metropolitan Transportation Commission, San Francisco Bay area : developing regional objectives and performance measures to improve system operations

    2009-04-01

    The Metropolitan Transportation Commission (MTC) uses an objectives-driven, performance-based approach in its transportation planning for the San Francisco Bay Area. This approach focuses attention on transportation investments of highest priority. T...

  9. Some Challenges of an “Upside Down” Nitrogen Budget – Science and Management in Greenwich Bay, RI (USA)

    When nutrients impact estuarine water quality, scientists and managers instinctively focus on quantifying and controlling land-based sources. However, in Greenwich Bay, RI, the estuary opens onto a larger and more intensively fertilized coastal water body (Narragansett Bay). Prev...

  10. Narragansett, RI Lab--Office of Research and Development

    The EPA-ORD laboratory in Narragansett, RI is a recognized leader in scientific knowledge and expertise concerning the ecology of oceans, estuaries, and water-sheds, and the effects of human activities on that ecology.

  11. Historical Assessment of Hypoxia in Narragansett Bay Using Geochemical Markers

    Eutrophication due to anthropogenic activities has affected aquatic ecosystems globally. Increased inputs of nitrogen and other nutrients to estuarine and marine ecosystems as a result of agricultural practices, urbanization and suburbanization have resulted in degradation of wat...

  12. 33 CFR 110.145 - Narragansett Bay, R.I.

    2010-07-01

    ... area. Fixed mooring piles or stakes will not be allowed. (2) Anchorage B. Off the west shore of... mooring piles or stakes will not be allowed. (ii) Anchorage X-1, Naval explosives and ammunition handling... buoys for marking anchors or moorings in place will be allowed in this area. Fixed mooring piles or...

  13. H01938: NOS Hydrographic Survey , Narragansett Bay, Rhode Island

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Oceanic and Atmospheric Administration (NOAA) has the statutory mandate to collect hydrographic data in support of nautical chart compilation for safe...

  14. Application of OILMAP and SIMAP to predict the transport and fate of the North Cape spill, Narragansett, RI

    Spaulding, M.L.; Opishinski, T.

    1996-01-01

    Several spill model systems developed by ASA (Applied Science Associates, Inc.) were tested during the North Cape oil spill in which 828,000 gallons of oil were released into Narragansett Bay, Rhode Island. The OILMAP spill model was applied to forecast the spill movement during the event. Input on the currents was obtained by a pre-existing tidal hydrodynamic model entitled COASTMAP, and wind data was obtained from a real time wind observation station. A careful comparison between the predictions and the observations showed that the model did very well in predicting the general path and spatial coverage of the spill. The model was also able to forecast features of the spill evolution including the entrance of oil into Pt. Judith Harbor, and the impact location and time of arrival on Block Island. SIMAP was developed to predict the transport, fate and biological impacts from an oil spill in marine waters. However, it was found that SIMAP did not have the algorithms to estimate entrainment in the surf zone, which was the dominant mechanisms for oil dispersion in the water. 15 refs., 17 figs

  15. 77 FR 2972 - Thunder Bay Power Company, Thunder Bay Power, LLC, et al.

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Thunder Bay Power Company, Thunder Bay Power, LLC, et al.; Notice of Application for Transfer of Licenses, and Soliciting Comments and Motions To Intervene Thunder Bay Power Company Project No. 2404-095 Thunder Bay Power, LLC Midwest Hydro, Inc...

  16. Steam, solarization, and tons of prevention: the San Francisco Public Utilities Commission's fight to contain Phytophthoras in San Francisco Bay area restoration sites

    Greg Lyman; Jessica Appel; Mia Ingolia; Ellen Natesan; Joe Ortiz

    2017-01-01

    To compensate for unavoidable impacts associated with critical water infrastructure capital improvement projects, the San Francisco Public Utilities Commission (SFPUC) restored over 2,050 acres of riparian, wetland, and upland habitat on watershed lands in Alameda, Santa Clara, and San Mateo Counties. Despite strict bio-sanitation protocols, plant pathogens (...

  17. Modeling Benthic Sediment Processes to Predict Water Quality and Ecology in Narragansett Bay

    The benthic sediment acts as a huge reservoir of particulate and dissolved material (within interstitial water) which can contribute to loading of contaminants and nutrients to the water column. A benthic sediment model is presented in this report to predict spatial and temporal ...

  18. Growth of juvenile hard clams in Narragansett Bay after laboratory exposure to low pH

    Ocean uptake of carbon dioxide is causing decreases in pH and the concentration of carbonate ions used by marine organisms during shell and skeletal formation. When these conditions are reproduced in laboratory environments and field enclosures, effects on biological rates such ...

  19. URBANIZATION ALTERS FATTY ACID CONCENTRATIONS OF STREAM FOOD WEBS IN THE NARRAGANSETT BAY WATERSHED

    Urbanization and associated human activities negatively affect stream algal and invertebrate assemblages, likely altering food webs. Our goal was to determine if urbanization affects food web essential fatty acids (EFAs) and if EFAs could be useful ecological indicators in monito...

  20. H11310: NOS Hydrographic Survey , Narragansett Bay, Rhode Island, 2004-07-29

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Oceanic and Atmospheric Administration (NOAA) has the statutory mandate to collect hydrographic data in support of nautical chart compilation for safe...

  1. Seasonal variation in apparent conductivity and soil salinity at two Narragansett Bay salt marshes

    Measurement of the apparent conductivity of salt marsh sediments using electromagnetic induction (EMI) is a rapid alternative to traditional methods of salinity determination that can be used to map soil salinity across a marsh surface. Soil salinity measures can provide informat...

  2. Commissioning MMS

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  3. Commission 1

    state" to provide the Commission with information on the measures that they have ...... policies and identify the gaps in ensuring the full realisation of socio- economic .... Boulle L, Harris Band Hoexter C Constitutional and Administrative Law.

  4. Joint Commission

    ... for the latest publication of The Joint Commission Journal on Quality and Patient Safety (JQPS). . How We Work Process improvement program breeds quality culture, empowers staff An article in Quality Progress, June ...

  5. 76 FR 23193 - Traffic Separation Schemes: In the Approaches to Portland, ME; Boston, MA; Narragansett Bay, RI...

    2011-04-26

    ...: Comments and material received from the public, as well as documents mentioned in this preamble as being.... Federalism F. Unfunded Mandates Reform Act G. Taking of Private Property H. Civil Justice Reform I... shown on nautical charts, is described in the United States Coast Pilot, was implemented by the...

  6. Internet-Based Methods to Construct a Stakeholder Network for the Sustainability of Narragansett Bay, Rhode Island

    Background\\Questions\\Methods Conservation coalitions, where numerous organizations collaborate for the augmented environmental protection of a critical habitat, have been shown to reduce redundancy and increase effectiveness. In order to initiate an effective conservation coalit...

  7. SPATIAL AND TEMPORAL DISTRIBUTION OF COLOURED DISSOLVED ORGANIC MATTER (CDOM) IN NARRAGANSETT BAY, RI: IMPLICATIONS FOR PHYTOPLANKTON IN COASTAL WATERS

    One indicator of health in estuarine and coastal ecosystems is the ability of local waters to transmit sunlight to planktonic, macrophytic, and other submerged vegetation for photosynthesis. The concentration of coloured dissolved organic matter (CDOM) is a primary factor affecti...

  8. 75 FR 77529 - Traffic Separation Schemes: In the Approaches to Portland, ME; Boston, MA; Narragansett Bay, RI...

    2010-12-13

    ... materials, performance, design, or operation; test methods; sampling procedures; and related management... category of actions that do not individually or cumulatively have a significant effect on the human... established with a radius of 5.45 miles centered upon geographical position 43[deg]31.60' N, 70[deg]05.53' W...

  9. Mex Bay

    user

    2015-02-23

    Feb 23, 2015 ... surveys to assess the vulnerability of the most important physical and eutrophication parameters along. El- Mex Bay coast. As a result of increasing population and industrial development, poorly untreated industrial waste, domestic sewage, shipping industry and agricultural runoff are being released to the.

  10. 78 FR 56944 - Pacific Gas and Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation

    2013-09-16

    ... process waste at the Humboldt Bay ISFSI will not significantly affect the quality of the human environment... NUCLEAR REGULATORY COMMISSION [Docket No. 72-27; NRC-2011-0115] Pacific Gas and Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation AGENCY: Nuclear Regulatory Commission. ACTION...

  11. Towards a sustainable future in Hudson Bay

    Okrainetz, G.

    1991-01-01

    To date, ca $40-50 billion has been invested in or committed to hydroelectric development on the rivers feeding Hudson Bay. In addition, billions more have been invested in land uses such as forestry and mining within the Hudson Bay drainage basin. However, there has never been a study of the possible impacts on Hudson Bay resulting from this activity. Neither has there been any federal environmental assessment on any of the economic developments that affect Hudson Bay. To fill this gap in knowledge, the Hudson Bay Program was established. The program will not conduct scientific field research but will rather scan the published literature and consult with leading experts in an effort to identify biophysical factors that are likely to be significantly affected by the cumulative influence of hydroelectric and other developments within and outside the region. An annotated bibliography on Hudson Bay has been completed and used to prepare a science overview paper, which will be circulated for comment, revised, and used as the basis for a workshop on cumulative effects in Hudson Bay. Papers will then be commissioned for a second workshop to be held in fall 1993. A unique feature of the program is its integration of traditional ecological knowledge among the Inuit and Cree communities around Hudson Bay with the scientific approach to cumulative impact assessment. One goal of the program is to help these communities bring forward their knowledge in such a way that it can be integrated into the cumulative effects assessment

  12. Urban Greening Bay Area

    Information about the San Francisco Bay Water Quality Project (SFBWQP) Urban Greening Bay Area, a large-scale effort to re-envision urban landscapes to include green infrastructure (GI) making communities more livable and reducing stormwater runoff.

  13. Safe LHC beam commissioning

    Uythoven, J.; Schmidt, R.

    2007-01-01

    Due to the large amount of energy stored in magnets and beams, safety operation of the LHC is essential. The commissioning of the LHC machine protection system will be an integral part of the general LHC commissioning program. A brief overview of the LHC Machine Protection System will be given, identifying the main components: the Beam Interlock System, the Beam Dumping System, the Collimation System, the Beam Loss Monitoring System and the Quench Protection System. An outline is given of the commissioning strategy of these systems during the different commissioning phases of the LHC: without beam, injection and the different phases with stored beam depending on beam intensity and energy. (author)

  14. Regulatory Commission of Alaska

    Map Help Regulatory Commission of Alaska Login Forgot Password Arrow Image Forgot password? View Cart login Procedures for Requesting Login For Consumers General Information Telephone Electric Natural Gas

  15. Guidelines for residential commissioning

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  16. Commission on Legal Matters

    Staff Association

    2016-01-01

    What is a commission within the Staff Association (SA)? A commission is a working group of the CERN Staff Council, led by a staff representative. The commission is composed mainly of staff representatives, but interested members of the SA can apply to participate in the work of a commission. What is the commission on legal matters? The commission on legal matters works on texts governing the employment conditions of staff (Employed Members of Personnel and Associated Members of Personnel). This covers legal documents such as the Staff Rules and Regulations, administrative and operational circulars, as well as any other document relating to employment conditions. How is the work organised in this commission? The revision process of the text is generally done along following lines: The HR department, and its legal experts, proposes new texts or modifications to existing texts. A schedule for the study of these texts is established each year and this calendar by the commission to plan its work. The new or modi...

  17. Discharge between San Antonio Bay and Aransas Bay, southern Gulf Coast, Texas, May-September 1999

    East, Jeffery W.

    2001-01-01

    Along the Gulf Coast of Texas, many estuaries and bays are important habitat and nurseries for aquatic life. San Antonio Bay and Aransas Bay, located about 50 and 30 miles northeast, respectively, of Corpus Christi, are two important estuarine nurseries on the southern Gulf Coast of Texas (fig. 1). According to the Texas Parks and Wildlife Department, “Almost 80 percent of the seagrasses [along the Texas Gulf Coast] are located in the Laguna Madre, an estuary that begins just south of Corpus Christi Bay and runs southward 140 miles to South Padre Island. Most of the remaining seagrasses, about 45,000 acres, are located in the heavily traveled San Antonio, Aransas and Corpus Christi Bay areas” (Shook, 2000).Population growth has led to greater demands on water supplies in Texas. The Texas Water Development Board, the Texas Parks and Wildlife Department, and the Texas Natural Resource Conservation Commission have the cooperative task of determining inflows required to maintain the ecological health of the State’s streams, rivers, bays, and estuaries. To determine these inflow requirements, the three agencies collect data and conduct studies on the need for instream flows and freshwater/ saline water inflows to Texas estuaries.To assist in the determination of freshwater inflow requirements, the U.S. Geological Survey (USGS), in cooperation with the Texas Water Development Board, conducted a hydrographic survey of discharge (flow) between San Antonio Bay and Aransas Bay during the period May–September 1999. Automated instrumentation and acoustic technology were used to maximize the amount and quality of data that were collected, while minimizing personnel requirements. This report documents the discharge measured at two sites between the bays during May–September 1999 and describes the influences of meteorologic (wind and tidal) and hydrologic (freshwater inflow) conditions on discharge between the two bays. The movement of water between the bays is

  18. Daya Bay PWRs will be state-of-the-art

    Anon.

    1991-01-01

    Preparations for commissioning and startup of the Daya Bay nuclear plant in Guangdong, China, have been underway for some time. The project which incorporates two imported French 900 MWe Pressurized Water Reactors, represents a major technology transfer effort between the Chinese and European contractors, resulting in the highest standards of quality. (author)

  19. The Lhc beam commissioning

    Redarelli, S.; Bailey, R.

    2008-01-01

    The plans for the Lhc proton beam commissioning are presented. A staged commissioning approach is proposed to satisfy the request of the Lhc experiments while minimizing the machine complexity in early commissioning phases. Machine protection and collimation aspects will be tackled progressively as the performance will be pushed to higher beam intensities. The key parameters are the number of bunches, k b , the proton intensity pe bunch, N, and the β in the various interaction points. All together these parameters determine the total beam power and the complexity of the machine. We will present the proposed trade off between the evolution of these parameters and the Lhc luminosity performance.

  20. Pawcatuck River and Narragansett Bay Drainage Basins Water and Related Land Resources Study. Big River Reservoir Project. Volume II. Appendix A-G.

    1981-07-01

    actuarial rate are determined and flood plain zoning is enacted. A flood hazard analysis of the Pocasset River in Johnston has been completed by the Soil...RELATED LAND ESOURCES STUDY TPANOWMSON MAIN CNlmlONCOOT CUMV ENA ________ _____ AW B- ANONO o EOF " asmS TAPA MTIONN. COS6 PLATE NO 6-16 " : Ei 2 wm (L ca 0

  1. Big River Reservoir Project - Pawcatuck River and Narragansett bay Drainage Basins - Water and related Land Resources Study Volume IV. Attachment I.

    1981-07-01

    knowledge , as a result of our field studies, none of these sites will be impacted by any of the alternative plans. There are numerous sites in the watershed...NENYIAC REPORT A report by the New England-New York Inter--Agency Committee (NENYIAC) was completed in Mar:h 1955. It contained an inventory of resources...could be ived b.- hikers,. horceback riders, and -:oss -_ountry skiers . The height nf land in this location could offer scenic views of the west of

  2. AUV Fest 2008: Navy Mine-hunting Robots Help NOAA Explore Sunken History, in Narragansett Bay, RI between 20080512 and 20080523

    National Oceanic and Atmospheric Administration, Department of Commerce — The goal of the Bonaire 2008 expedition is to survey this unique environment over a greater depth range than can be reached with compressed air scuba, using three...

  3. Big River Reservoir Project. Pawcatuck River and Narragansett Bay Drainage Basins. Water and Related Land Resources Study. Volume I. Main Report.

    1981-07-01

    Reservoir (boating), Carr Pond (swimming, boating, trails), Phelps Pond ( swiming , picnicking), and Hungry and Harkney Hills (camping) would allow this...dredged from navigable waters. Eutrophic** Rich in nutritive matter. Fill Material*. Any pollutant used to create fill in the sense of replacing an...intermittent streams. Oligotrophlc**. Poor in nutritive matter. Plankton. The passively floating or swimming, usually minute animal and plant life, of a

  4. Big River Reservoir Project - Pawcatuck River and Narragansett Bay Drainage Basins - Water and Related Land Resources Study. Volume III. Appendices H-K.

    1981-07-01

    House wren --- -*- --- --- R Mockingbird --- --- --- -- Catbird Q R C C C Brown thrasher --- -- - --- R Robin R - C R 0 Wood thrush --- --- 0...new growth and kill it. At this stage, the terrestrial ecosystem will have been all but replaced by a large area of standing water. Hilltops vegetated...mice, voles, shrews, etc.) will be unavoidably killed or injured as clearing and construction occurs. Animals occu- pying burrows will suffer high

  5. Library holdings for AUV Fest 2008: Navy Mine-hunting Robots Help NOAA Explore Sunken History, in Narragansett Bay, RI between May 12, 2008 and May 23, 2008

    National Oceanic and Atmospheric Administration, Department of Commerce — Library Catalog may include: Data Management Plans, Cruise Plans, Cruise Summary Reports, Scientific "Quick Look Reports", Video Annotation Logs, Image Collections,...

  6. eBay.com

    Engholm, Ida

    2014-01-01

    Celebrated as one of the leading and most valuable brands in the world, eBay has acquired iconic status on par with century-old brands such as Coca-Cola and Disney. The eBay logo is now synonymous with the world’s leading online auction website, and its design is associated with the company...

  7. The Danish Welfare Commission

    Gjerding, Allan Næs

    2006-01-01

    on public services, and install economic incentives for the behaviour of private households. The paper then digs into the proposals of the commission that are broadly grouped into five policy target areas con-cerning (1) the ageing of the population, (2) the incentives for labour market participation, (3......The paper deals with the main report of the Danish Welfare Commission and the one-hundred-and-nine proposals on the structure of the future Danish welfare state that the com-mission has put forward. Following upon a brief review of the discussion on the work of the Danish Welfare Commission......) competitiveness in the global economy, (4) behavioural regulation of the use of public bene-fits and services, and (5) management within tight budgets of an increasing demand on health and care. Finally, the concluding section sums up the discussion and elaborates on the debate on the Welfare Commission’s work...

  8. Commissioning for Humidified Buildings

    Deal, Brian

    1998-01-01

    .... Although proper commissioning procedures have been noted to reduce the potential for approximately 70 percent of these claims, no standards exist for the control of moisture migration in building...

  9. Nuclear Regulatory Commission Issuances

    NONE

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  10. Nuclear Regulatory Commission issuances

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    1992-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    1991-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission Issuances

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    1991-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  17. Nuclear Regulatory Commission issuances

    1991-11-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission Issuances

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission Issuance

    1994-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission Issuances

    1994-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances

    1991-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Cambridge Bay: Six years later

    Edworthy, J.

    1992-01-01

    The story of a wind energy project in Cambridge Bay, Northwest Territories, is presented from the perspective of the company that supplied the equipment and supported the project through its life. The project was intended to demonstrate the technical, economic, institutional, and operational issues and barriers to the use of wind power in remote communities. The system, involving four Carter Model 25 units each rated at 25 kW, was installed in 1987 and commissioned in January 1988. Shortly thereafter, the Northern Canada Power Commission (which requested the project in the first place) was taken over by the territorial administration, and employee continuity was disrupted. At about the same time, Federal support for the project decreased. Technical problems included a transformer failure, a generator failure, and a failed yaw tube which turned out to be lightly designed and poorly made. The Carter turbine company also went out of business, making spare parts difficult to obtain. The utility organization changed abruptly in summer 1991 with the arrival of a new area superintendent who did not support the project. The wind farm was shut down in 1992. The project generated a total of 160,982 kWh with over 71% availability. The positive and negative results from the project are summarized and recommendations are made for future Arctic wind power projects. 2 figs., 1 tab

  3. Nuclear Regulatory Commission Issuances

    1992-01-01

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967

  4. Commissioning of ATLAS

    Thomas, J

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focussing on combined running and track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  5. ATF2 Commissioning

    Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  6. ATF2 COMMISSIONING

    Seryi, A; Parker, B; Schulte, D; Delahaye, J P; Tomas, R; Zimmermann, F; Wolski, A; Elsen, E; Sanuki, T; Gianfelice-Wendt, E; Ross, M; Wendt, M; Takahashi, T; Bai, S; Gao, J; Bolzon, B; Geffroy, N; Jeremie, A; Apsimon, R; Burrows, P; Constance, B; Perry, C; Resta-Lopez, J; Swinson, C; Araki, S; Aryshev, A; Hayano, H; Honda, Y; Kubo, K; Kume, T; Kuroda, S; Masuzawa, M; Naito, T; Okugi, T; Sugahara, R; Tauchi, T; Terunuma, N; Urakawa, J; Yokoya, K; Iwashita, Y; Sugimoto, T; Heo, A Y; Kim, E S; Kim, H S; Bambade, P; Renier, Y; Rimbault, C; Huang, J Y; Kim, S H; Park, Y J; Hwang, W H; Blair, G; Boogert, S; Karataev, P; Molloy, S; Amann, J; Bellomo, P; Lam, B; McCormick, D; Nelson, J; Paterson, E; Pivi, M; Raubenheimer, T; Spencer, C; Wang, M H; White, G; Wittmer, W; Woodley, M; Yan, Y; Zhou, F; Angal-Kalinin, D; Jones, J; Lyapin, A; Scarfe, A; Kamiya, Y; Komamiya, S; Oroku, M; Suehara, T; Yamanaka, T

    2010-01-01

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  7. Biscayne Bay Alongshore Epifauna

    National Oceanic and Atmospheric Administration, Department of Commerce — Field studies to characterize the alongshore epifauna (shrimp, crabs, echinoderms, and small fishes) along the western shore of southern Biscayne Bay were started in...

  8. Bathymetry in Jobos Bay

    National Oceanic and Atmospheric Administration, Department of Commerce — This image represents a 4x4 meter resolution bathymetric surface for Jobos Bay, Puerto Rico (in NAD83 UTM 19 North). The depth values are in meters referenced to the...

  9. Hammond Bay Biological Station

    Federal Laboratory Consortium — Hammond Bay Biological Station (HBBS), located near Millersburg, Michigan, is a field station of the USGS Great Lakes Science Center (GLSC). HBBS was established by...

  10. Humboldt Bay Orthoimages

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set consists of 0.5-meter pixel resolution, four band orthoimages covering the Humboldt Bay area. An orthoimage is remotely sensed image data in which...

  11. Integrating science and resource management in Tampa Bay, Florida

    Yates, Kimberly K.; Greening, Holly; Morrison, Gerold

    2011-01-01

    Tampa Bay is recognized internationally for its remarkable progress towards recovery since it was pronounced "dead" in the late 1970s. Due to significant efforts by local governments, industries and private citizens throughout the watershed, water clarity in Tampa Bay is now equal to what it was in 1950, when population in the watershed was less than one-quarter of what it is today. Seagrass extent has increased by more than 8,000 acres since the mid-1980s, and fish and wildlife populations are increasing. Central to this successful turn-around has been the Tampa Bay resource management community's long-term commitment to development and implementation of strong science-based management strategies. Research institutions and agencies, including Eckerd College, the Florida Wildlife Commission Fish and Wildlife Research Institute, Mote Marine Laboratory, National Oceanic and Atmospheric Administration, the Southwest Florida Water Management District, University of South Florida, U.S. Environmental Protection Agency, U.S. Geological Survey, local and State governments, and private companies contribute significantly to the scientific basis of our understanding of Tampa Bay's structure and ecological function. Resource management agencies, including the Tampa Bay Regional Planning Council's Agency on Bay Management, the Southwest Florida Water Management District's Surface Water Improvement and Management Program, and the Tampa Bay Estuary Program, depend upon this scientific basis to develop and implement regional adaptive management programs. The importance of integrating science with management has become fully recognized by scientists and managers throughout the region, State and Nation. Scientific studies conducted in Tampa Bay over the past 10–15 years are increasingly diverse and complex, and resource management programs reflect our increased knowledge of geology, hydrology and hydrodynamics, ecology and restoration techniques. However, a synthesis of this

  12. 78 FR 32295 - Commission Meeting

    2013-05-29

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: June 20...

  13. 77 FR 10599 - Commission Meeting

    2012-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 15...

  14. 78 FR 12412 - Commission Meeting

    2013-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 21...

  15. 77 FR 28420 - Commission Meeting

    2012-05-14

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: June 7, 2012, at 9...

  16. 78 FR 52601 - Commission Meeting

    2013-08-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: September 19, 2013...

  17. 77 FR 70204 - Commission Meeting

    2012-11-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the SUPPLEMENTARY INFORMATION section of this notice. DATES: December 14, 2012...

  18. 78 FR 69517 - Commission Meeting

    2013-11-19

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: December 12, 2013...

  19. 77 FR 52106 - Commission Meeting

    2012-08-28

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: September 20...

  20. Nuclear regulatory commission issuances

    1989-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances

    1982-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  2. Nuclear Regulatory Commission issuances

    1986-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission Issuances

    1994-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  4. Nuclear Regulatory Commission issuances

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  5. Nuclear Regulatory Commission issuances

    1991-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    1989-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Danials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances

    1989-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    1990-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    1991-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    1982-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  13. Nuclear Regulatory Commission issuances

    1987-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    1988-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    1989-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear regulatory commission issuances

    1990-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  18. DESY: HERA commissioning

    Anon.

    1992-01-01

    The commissioning of the world's first electron-proton collider - the 6.3 kilometre HERA ring at the DESY Laboratory in Hamburg - last year was the result of more than a decade of careful planning, design and construction

  19. Nuclear Regulatory Commission Issuances

    1986-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    1991-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances

    1988-01-01

    This report includes the issuance received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    NONE

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  3. Nuclear Regulatory Commission Issuances

    1988-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances

    1988-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    1990-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances

    1988-06-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission Issuances

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    1987-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    1982-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  11. Nuclear Regulatory Commission issuances

    1990-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety And Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    1985-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    1990-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    1982-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. HYTEST Phase I Facility Commissioning and Modeling

    Lee P. Shunn; Richard D. Boardman; Shane J. Cherry; Craig G. Rieger

    2009-09-01

    The purpose of this document is to report the first year accomplishments of two coordinated Laboratory Directed Research and Development (LDRD) projects that utilize a hybrid energy testing laboratory that couples various reactors to investigate system reactance behavior. This work is the first phase of a series of hybrid energy research and testing stations - referred to hereafter as HYTEST facilities – that are planned for construction and operation at the Idaho National Laboratory (INL). A HYTEST Phase I facility was set up and commissioned in Bay 9 of the Bonneville County Technology Center (BCTC). The purpose of this facility is to utilize the hydrogen and oxygen that is produced by the High Temperature Steam Electrolysis test reactors operating in Bay 9 to support the investigation of kinetic phenomena and transient response of integrated reactor components. This facility provides a convenient scale for conducting scoping tests of new reaction concepts, materials performance, new instruments, and real-time data collection and manipulation for advance process controls. An enclosed reactor module was assembled and connected to a new ventilation system equipped with a variable-speed exhaust blower to mitigate hazardous gas exposures, as well as contract with hot surfaces. The module was equipped with a hydrogen gas pump and receiver tank to supply high quality hydrogen to chemical reactors located in the hood.

  17. 75 FR 11837 - Chesapeake Bay Watershed Initiative

    2010-03-12

    ... DEPARTMENT OF AGRICULTURE Commodity Credit Corporation Chesapeake Bay Watershed Initiative AGENCY...: Notice of availability of program funds for the Chesapeake Bay Watershed Initiative. SUMMARY: The... through the Chesapeake Bay Watershed Initiative for agricultural producers in the Chesapeake Bay watershed...

  18. 33 CFR 100.124 - Maggie Fischer Memorial Great South Bay Cross Bay Swim, Great South Bay, New York.

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Maggie Fischer Memorial Great South Bay Cross Bay Swim, Great South Bay, New York. 100.124 Section 100.124 Navigation and Navigable... NAVIGABLE WATERS § 100.124 Maggie Fischer Memorial Great South Bay Cross Bay Swim, Great South Bay, New York...

  19. Commissioning of the LHC

    CERN. Geneva

    2007-01-01

    The LHC construction is now approaching the end and it is now time to prepare for commissioning with beam. The behavior of a proton storage ring is much different to that of LEP, which profited from strong radiation damping to keep the beam stable. Our last experience with a hadron collider at CERN goes back more than 15 years when the proton-antiproton collider last operated. Ppbar taught us a lot about the machine physics of bunched beam proton storage rings and was essential input for the design of the LHC. After a short presentation of where we stand today with machine installation and hardware commissioning, I will discuss the main machine physics issues that will have to be dealt with in the LHC.

  20. Nuclear Regulatory Commission issuances

    1982-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  1. Nuclear Regulatory Commission issuances

    1989-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety nd Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  2. Nuclear Regulatory Commission issuances

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services

  3. Nuclear Regulatory Commission issuances

    NONE

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  4. BROOKHAVEN: Booster commissioned

    Bleser, Ed

    1992-03-15

    The construction and first commissioning phase of the Booster synchrotron to inject into Brookhaven's veteran Alternating Gradient Synchrotron (AGS) were completed last year. Scheduled to come into operation this year, the new Booster will extend the research capabilities AGS, and with its ability to accelerate partially stripped heavy ions will play an essential role in the chain of accelerators serving the Relativistic Heavy Ion Collider (RHIC)

  5. Commission on Social Security

    Staff Association

    2010-01-01

    A commission studying past, present, and future social stakes ! For many years we have been hearing about the problems of funding of health insurance benefits in our different Member States. At CERN we are not totally immune from this problem.  To start with, let us recall that we have a mutual-benefit scheme which covers everyone for the consequences of the uncertainties in life (illness and accidents). The rules of our scheme are established by CERN in the framework of a sub-group of the Standing Concertation Committee, the CERN Health Insurance Scheme Board (CHISB), which is also in charge of managing the scheme.  The work of the “ProtSoc” (Protection Sociale – Social Security) commission, as we like to call it at the Staff Association, is to help your representatives on the CHISB, by preparing together with them the subjects and positions to be put forward and defended. This commission, which groups together the staff delegates who wish to invest their ...

  6. Chesapeake Bay under stress

    According to extensive data obtained over its 13,000 km of shoreline, the Chesapeake Bay has been suffering a major, indeed unprecedented, reduction in submerged vegetation. Chesapeake Bay is alone in experiencing decline in submerged vegetation. Other estuary systems on the east coast of the United States are not so affected. These alarming results were obtained by the synthesis of the findings of numerous individual groups in addition to large consortium projects on the Chesapeake done over the past decade. R. J. Orth and R. A. Moore of the Virginia Institute of Marine Science pointed to the problem of the severe decline of submerged grasses on the Bay and along its tributaries. In a recent report, Orth and Moore note: “The decline, which began in the 1960's and accelerated in the 1970's, has affected all species in all areas. Many major river systems are now totally devoid of any rooted vegetation” (Science, 222, 51-53, 1983).

  7. Mobile Bay turbidity study

    Crozier, G. F.; Schroeder, W. W.

    1978-01-01

    The termination of studies carried on for almost three years in the Mobile Bay area and adjacent continental shelf are reported. The initial results concentrating on the shelf and lower bay were presented in the interim report. The continued scope of work was designed to attempt a refinement of the mathematical model, assess the effectiveness of optical measurement of suspended particulate material and disseminate the acquired information. The optical characteristics of particulate solutions are affected by density gradients within the medium, density of the suspended particles, particle size, particle shape, particle quality, albedo, and the angle of refracted light. Several of these are discussed in detail.

  8. Nuclear Regulatory Commission information digest

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  9. A Guide to Building Commissioning

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  10. Discussion: European Commission policy

    Coldwell, R.

    1993-01-01

    This paper documents the debate which arose following two papers presented to a seminar run by the Centre for the Study of Regulated Industries, on 11th November 1992, on European Commission (EC) energy policies. The issues raised cover how an internal market for electricity and natural gas will be implemented under a proposed EC directive, bearing in mind the level of opposition from a number of Member States. How this Directive will apply to vertically integrated structures, such as Scottish Electricity Industry, is also considered. (UK)

  11. Commissioning of the SCT

    Hayward, Helen

    2010-01-01

    In September 2008, the large hadron collider (LHC) at CERN was switched on with successful tests of circulating beam in both directions of the ring. The ATLAS semiconductor tracker (SCT) has been installed in the ATLAS cavern since summer 2007 and then integrated with the rest of the ATLAS subdetectors, in preparation for this event. After the SCT was assembled on the surface, the process of being commissioned using cosmic ray events began, and continued after the SCT was installed in the cavern with the rest of the ATLAS detector. Performance results will be given for the recent cosmic runs.

  12. Atomic Energy Commission Act, 1963

    1963-01-01

    Promulgated in 1963, the Atomic Energy Commission Act (204) established and vested in the Ghana Atomic Energy Commission the sole responsibility for all matters relating to the peaceful uses of atomic energy in the country. Embodied in the Act are provisions relating to the powers, duties, rights and liabilities of the Commission. (EAA)

  13. Bay in Flux: Marine Climate Impacts, Art and Tablet App Design

    Kintisch, E. S.

    2012-12-01

    Bay in Flux is a year-long experimental effort to design and develop interactive tablet computer apps exploring the marine impacts of climate change. The goal is to convey, visualize and enliven scientific ideas around this topic, while engaging a broad audience through the design of interactive content. Pioneering new models of scientist-artist collaborations are a central part of the effort as well. The project begins with an innovative studio class at the Rhode Island School of Design (RISD) called Bay in Flux, taught in the Fall 2012 semester. Its three instructor team includes two artist-designers and one science reporter, with active collaborations from affiliated marine scientists. The subject matter focus is the Narragansett Bay, which has shown physical, chemical and ecological impacts of climate change, along with the ongoing efforts of researchers to explain and characterize it. In exploring this rich story, we intend to innovate pioneering means of handling narrative material on interactive e-books, enable data collection by citizen scientists or devise game-like simulations to enable audiences to explore and understand complex natural systems. The lessons we seek to learn in this project include: how to effectively encourage collaborations between scientists and designers around digital design; how to pioneer new and compelling ways to tell science-based nonfiction stories on tablets; and how art and design students with no scientific training can engage with complex scientific content effectively. The project will also challenge us to think about the tablet computer not only as a data output device -- in which the user reads, watches, or interacts with provided content -- but also as a dynamic and ideal tool for mobile data input, enabling citizen science projects and novel connections between working researchers and the public. The intended audience could include high school students or older audiences who currently eschew science journalism. HTML5

  14. Richards Bay effluent pipeline

    Lord, DA

    1986-07-01

    Full Text Available of major concern identified in the effluent are the large volume of byproduct calcium sulphate (phosphogypsum) which would smother marine life, high concentrations of fluoride highly toxic to marine life, heavy metals, chlorinated organic material... ........................ 9 THE RICHARDS BAY PIPELINE ........................................ 16 Environmental considerations ................................... 16 - Phosphogypsum disposal ................................... 16 - Effects of fluoride on locally occurring...

  15. Bayes and Networks

    Gao, F.

    2017-01-01

    The dissertation consists of research in three subjects in two themes—Bayes and networks: The first studies the posterior contraction rates for the Dirichlet-Laplace mixtures in a deconvolution setting (Chapter 1). The second subject regards the statistical inference in preferential attachment

  16. Commission 4: Ephemerides

    Kaplan, George H.; Hohenkerk, Catherine Y.; Fukushima, Toshio; Arlot, Jean-Eudes; Bangert, John A.; Bell, Steven A.; Folkner, William M.; Lara, Martin; Pitjeva, Elena V.; Urban, Sean E.; Vondrák, Jan

    2012-04-01

    The Commission 4 Organizing Committee began its work for the 2009-2012 triennium by revising the commission's terms of reference, which serve as our ``mission statement.'' The new terms of reference are:(a)Maintain cooperation and collaboration between the national offices providing ephemerides, prediction of phenomena, astronomical reference data, and navigational almanacs.(b)Encourage agreement on the bases (reference systems, time scales, models, and constants) of astronomical ephemerides and reference data in the various countries. Promote improvements to the usability and accuracy of astronomical ephemerides, and provide information comparing computational methods, models, and results to ensure the accuracy of data provided.(c)Maintain databases, available on the Internet to the national ephemeris offices and qualified researchers, containing observations of all types on which the ephemerides are based. Promote the continued importance of observations needed to improve the ephemerides, and encourage prompt availability of these observations, especially those from space missions, to the science community.(d)Encourage the development of software and web sites that provide astronomical ephemerides, prediction of phenomena, and astronomical reference data to the scientific community and public.Promote the development of explanatory material that fosters better understanding of the use and bases of ephemerides and related data.

  17. Sustainable development in the Hudson Bay/James Bay bioregion

    Anon.

    1991-01-01

    An overview is presented of projects planned for the James Bay/Hudson Bay region, and the expected environmental impacts of these projects. The watershed of James Bay and Hudson Bay covers well over one third of Canada, from southern Alberta to central Ontario to Baffin Island, as well as parts of north Dakota and Minnesota in the U.S.A. Hydroelectric power developments that change the timing and rate of flow of fresh water may cause changes in the nature and duration of ice cover, habitats of marine mammals, fish and migratory birds, currents into and out of Hudson Bay/James Bay, seasonal and annual loads of sediments and nutrients to marine ecosystems, and anadromous fish populations. Hydroelectric projects are proposed for the region by Quebec, Ontario and Manitoba. In January 1992, the Canadian Arctic Resources Committee (CARC), the Environmental Committee of Sanikuluaq, and the Rawson Academy of Arctic Science will launch the Hudson Bay/James Bay Bioregion Program, an independent initiative to apply an ecosystem approach to the region. Two main objectives are to provide a comprehensive assessment of the cumulative impacts of human activities on the marine and freshwater ecosystems of the Hudson Bay/James Bay bioregion, and to foster sustainable development by examining and proposing cooperative processes for decision making among governments, developers, aboriginal peoples and other stakeholders. 1 fig

  18. Commissioning the GTA accelerator

    Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Bowling, S.; Brown, S.; Cole, R.; Gilpatrick, J.D.; Garnett, R.; Guy, F.W.; Ingalls, W.B.; Johnson, K.F.; Kerstiens, D.; Little, C.; Lohsen, R.A.; Lloyd, S.; Lysenko, W.P.; Mottershead, C.T.; Neuschaefer, G.; Power, J.; Rusthoi, D.P.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Connolly, R.; Weiss, R.; Saadatmand, K.

    1992-01-01

    The Ground Test Accelerator (GTA) is being used to resolve the physics and engineering issues related to accelerating, focusing, and steering a high-brightness, high-current H - beam and then neutralizing it. The goal is to produce a 24 MeV, 50 mA device with a 2% duty factor. Specific features of the GTA -- injector, beam optics, rf linac structures, diagnostics, control and rf power systems are described. The first four steps in commissioning have been completed. The RFQ predicted and measured performances are in good agreement; however, the transmission is lower than specifications. Input emittance is larger than design specifications and increases the effects of image charge and multipoles. Displacement of steering magnets in either the horizontal or vertical plane caused beam displacements in both planes. It is suspected that quadrupole rotation is the cause of the coupled motion. 9 figs., 5 tabs., 11 refs

  19. Safety Commission databases support

    Petit, S; CERN. Geneva. TS Department

    2005-01-01

    A collaboration project between the Safety Commission (SC) and the Controls, Safety and Engineering databases group (TS/CSE) started last year. The aim of this collaboration is to transfer several SC applications from their local environments onto the D7i-MTF EDMS framework, for which the TS/CSE group is responsible. Different domains of activity and projects have been defined in the areas of equipment management, safety inspections, accidents and risks management. Priorities have been established in collaboration with SC. This paper presents the new Safety Inspections Management system (SIM) which will be put in production before the summer 2005 and reviews the constraints of both the users and the development and operational framework that needed to be taken into account. The technical solutions adopted to assure a successful production start-up and operation of the SIM system are described. Progress on other on-going projects and plans for the next year are also reported.

  20. GP commissioning in England.

    Charlton, Rodger

    2013-02-01

    The NHS, yet again, is in transition with an emphasis on groups of general practitioners (GPs) (clinical commissioning groups) making decisions on which specialist services should be chosen for patients requiring referral from primary care. It is an area of new terminology with a new language and further change for all working in the NHS and the all-important interface between primary and secondary care, and its impact on teamwork. There are many drivers including choice, efficiency, franchising of services, coordination and leadership in an enormous organisation, but not least reducing costs and keeping to a budget. There are many logistical issues and ethical anxieties, and only time will inform patients, practitioners, stakeholders and politicians as to its success.

  1. SSCL Commissioning and Operations

    1992-01-01

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL

  2. Upgrade of Daya Bay full scope simulator

    2006-01-01

    Daya Bay full scope simulator was manufactured by French THOMSON Company in earlier 1990s. It was put into operation in August 1992, one year before the plant's unit-1 was commissioned. During nearly 10 years, the Daya Bay simulator was used to train the control room operators. As many as 220 operators obtained their operator licenses or senior operators licenses. The Daya Bay simulator made a great contribution to the plant's operation. 2) Owing to the limitation of simulation technology and computer capacity in that age, Daya Bay simulator had its deficiencies from the beginning, making maintenance difficult, gradually bringing more and more impact on operator training. - Bad performance: The main computer was the Gould CONCEPT 32/67. Its calculation speed is quite low and memory very limited. Even in the normal operation mode, the average CPU load was up to 80%. The simulation fidelity and scope were not sufficient, which could not meet the deep level of training demand. Many special plant scenarios were not simulated; therefore it was not possible to undertake the verification exercises for the corresponding plant operations. - Poor maintainability: - In hardware aspect, due to that Gould CONCEPT 32/67 is with multi-board architecture. Thousands of tiny connection pins between boards and chasses was the weak link, after many times board plug in-out repair the connection became worse and worse. In addition, the spare parts are difficult to order. Computer crashes happened very often. Each time, the failures each took a few hours, even a few days to fix. - In software aspect, simulation modules suspension, OUT OF TIME error and software breakdown were often occurring. To restart the system took over half an hour each time, which seriously interrupted normal training. - In software maintenance aspect, most modules are manually coded and the development tools are difficult to use. Less than 10% of modifications related to the plant upgrade could be implemented on

  3. A Virtual Commissioning Learning Platform

    Mortensen, Steffen; Madsen, Ole

    2018-01-01

    The introduction of reconfigurable manufacturing systems (RMS), Industry 4.0 and the associated technologies requires the establishment of new competencies. Towards that goal, Aalborg University (AAU) has developed an Industry 4.0 learning factory, the AAU Smart Production Lab. The AAU Smart...... Production Lab integrates a number of Industry 4.0 technologies for learning and research purposes. One of the many techniques is virtual commissioning. Virtual commissioning uses a virtual plant model and real controllers (PLCs) enabling a full emulation of the manufacturing system for verification. Virtual...... commissioning can lower the commissioning time up to 63%, allowing faster time to market. However, virtual commission is still missing industrial impact one of the reasons being lack of competencies and integration experiences. The paper presents the setup of the virtual commissioning learning platform...

  4. Model Commissioning Plan and Guide Specifications

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  5. Liberalism, authority, and bioethics commissions.

    MacDougall, D Robert

    2013-12-01

    Bioethicists working on national ethics commissions frequently think of themselves as advisors to the government, but distance themselves from any claims to actual authority. Governments however may find it beneficial to appear to defer to the authority of these commissions when designing laws and policies, and might appoint such commissions for exactly this reason. Where does the authority for setting laws and policies come from? This question is best answered from within a normative political philosophy. This paper explains the locus of moral authority as understood within one family of normative political theories--liberal political theories--and argues that most major "liberal" commentators have understood both the source and scope of ethics commissions' authority in a manner at odds with liberalism, rightly interpreted. The author argues that reexamining the implications of liberalism for bioethics commissions would mean changing what are considered valid criticisms of such commissions and also changing the content of national bioethics commission mandates. The author concludes that bioethicists who participate in such commissions ought to carefully examine their own views about the normative limits of governmental authority because such limits have important implications for the contribution that bioethicists can legitimately make to government commissions.

  6. Commissioning of NSLS-II

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  7. National Knowledge Commission

    Pitroda, Sam

    2007-04-01

    India's National Knowledge Commission (NKC) established by the prime minister is focused on building institutions and infrastructure in Education, Science and Technology, Innovation etc. to meet the challenges of the knowledge economy in the 21st century and increase India's competitive advantage in the global market. India today stands poised to reap the benefits of a rapidly growing economy and a major demographic advantage, with 550 million young people below the age of 25 years, the largest in the world. The NKC is focused on five critical areas of knowledge related to access, concepts, creation, applications and services. This includes a variety of subject areas such as language, translations, libraries, networks, portals, affirmative action, distance learning, intellectual property, Entrepreneurship, application in Agriculture, health, small and medium scale industries, e-governance etc. One of the keys to this effort is to build a national broadband gigabit of networks of 500 nodes to connect universities, Libraries, Laboratories, Hospitals, Agriculture institutions etc. to share resources and collaborate on multidisciplinary activities. This presentation will introduce the NKC, discuss methodology, subject areas, specific recommendation and outline a plan to build knowledge networks and specifics on network architecture, applications, and utilities.

  8. Commissioning the SNO+ Detector

    Caden, E.; Coulter, I.; SNO+ Collaboration

    2017-09-01

    SNO+ is a multipurpose liquid scintillator neutrino experiment based at SNOLAB in Sudbury, Ontario, Canada. The experiment’s main physics goal is a search for neutrinoless double beta decay in Tellurium-130, but SNO+ will also study low energy solar neutrinos, geo- and reactor-antineutrinos, among other topics. We are reusing much of the hardware from the original SNO experiment, but significant work has taken place to transform the heavy water detector into a liquid scintillator detector. We present upgrades and improvements to the read-out electronics and trigger system to handle the higher data rates expected by a scintillator experiment. We show the successful installation and testing of a hold-down rope net for the acrylic vessel to counter-act the buoyancy of organic liquid scintillator. We also describe the new scintillator process plant and cover gas systems that have been constructed to achieve the purification necessary to meet our physics goals. We are currently commissioning the experiment with ultra-pure water in preparation for filling with scintillator in early 2017 and present the current status of this work.

  9. Post commissioning noise study

    Heraud, P.

    2008-01-01

    This presentation described a wind farm post-commissioning study conducted at a wind farm owned by Helimax Energy Inc. The farm was located in a partly-forested, partly cultivated region in Quebec that featured gently rolling hills. Over 600 dwellings were located within 2 km of the wind farm, and 44 dwellings were within the wind farm's boundaries. The noise impact assessments were conducted at various points near the wind farm. The wind farm was designed using an International Standards Organization (ISO) noise propagation model and a 40 dBA to provide adequate setbacks. The study was conducted using 10 days of continuous measurements at selected points of a wind farm. Points of reception included points from 650 m to 800 m. Noise over 2 km was not thought to be contributed by the wind turbine. The nearest dwelling was 512 m from one of the farm's wind turbines. The study also considered ground factor, temperature, relative humidity, and the height of the receptors. Quebec noise level limits are 40 dBA at night, and 45 dBA during the day. Noise level limits are independent of wind speed. Measured noise contributions over 40 dBA were not observed during the measurement program. The wind turbines were only audible for 1 night out of the 30 night study period. It was concluded that the ISO noise propagation model is a reliable tool for conducting noise impact assessments. tabs., figs

  10. LEIR commissioning successfully completed

    2006-01-01

    An important milestone has been passed in the preparation of the injector complex to supply ions to the LHC experiments. The LEIR lead-ion beam, seen on one of the control screens just before the PS injection region. The Low-Energy Ion Ring - LEIR for short - has passed its first tests with flying colours. On 12 May, the ring that will accumulate lead ions for the LHC was shut down after seven months of tests (see Bulletin 44/2005). 'The commissioning phase was a resounding success,' enthuses a satisfied Michel Chanel, head of the LEIR construction project. After several months of fine-tuning, the LEIR team has achieved its aim of producing the kind of beam required for first lead-ion collisions in the LHC in 2008. This involved creating bunches containing 230 million ions, in line with the specifications for those first beams. This success can be put down to the machine's outstanding design and components. 'It's a great achivement by all the teams involved in the machine's construction,' underlines Christian...

  11. ROS Installation and Commissioning

    Gorini, B

    The ATLAS Readout group (a sub-group of TDAQ) has now completed the installation and commissioning of all of the Readout System (ROS) units. Event data from ATLAS is initially handled by detector specific hardware and software, but following a Level 1 Accept the data passes from the detector specific Readout Drivers (RODs) to the ROS, the first stage of the central ATLAS DAQ. Within the final ATLAS TDAQ system the ROS stores the data and on request makes it available to the Level 2 Trigger (L2) processors and to the Event Builder (EB) as required. The ROS is implemented as a large number of PCs housing custom built cards (ROBINs) and running custom multi-threaded software. Each ROBIN card (shown below) contains buffer memories to store the data, plus a field programmable gate array ( FPGA ) and an embedded PowerPC processor for management of the memories and data requests, and is implemented as a 64-bit 66 MHz PCI card. Both the software and the ROBIN cards have been designed and developed by the Readout g...

  12. BCDC Bay Trail Alignment 2009

    California Natural Resource Agency — The Bay Trail provides easily accessible recreational opportunities for outdoor enthusiasts, including hikers, joggers, bicyclists and skaters. It also offers a...

  13. On-site gamma dose rates at the Andreeva Bay shore technical base, northwest Russia

    Reistad, O.; Dowdall, M.; Standring, W. J. F.; Selnaes, O. G.; Hustveit, S.; Steinhusen, F.; Sorlie, A.

    The spent nuclear fuel (SNF) and radioactive waste (RAW) storage facility at Andreeva Bay shore technical base (STB) is one of the largest and most hazardous nuclear legacy sites in northwest Russia. Originally commissioned in the 1960s the facility now stores large amounts of SNF and RAW associated

  14. Humic Substances from Manila Bay and Bolinao Bay Sediments

    Elma Llaguno

    1997-12-01

    Full Text Available The C,H,N composition of sedimentary humic acids (HA extracted from three sites in Manila Bay and six sites in Bolinao Bay yielded H/C atomic ratios of 1.1-1.4 and N/C atomic ratios of 0.09 - 0.16. The Manila Bay HA's had lower H/C and N/C ratios compared to those from Bolinao Bay. The IR spectra showed prominent aliphatic C-H and amide I and II bands. Manila Bay HA's also had less diverse molecular composition based on the GC-MS analysis of the CuO and alkaline permanganate oxidation products of the humic acids.

  15. Commission 31: Time

    Matsakis, Demetrios; Defraigne, Pascale; Hosokawa, M.; Leschiutta, S.; Petit, G.; Zhai, Z.-C.

    2007-03-01

    The most intensely discussed and controversial issue in time keeping has been the proposal before the International Telecommunications Union (ITU) to redefine Coordinated Universal Time (UTC) so as to replace leap seconds by leap hours. Should this proposal be adopted, the practice of inserting leap seconds would cease after a specific date. Should the Earth's rotation continue to de-accelerate at its historical rate, the next discontinuity in UTC would be an hour inserted several centuries from now. Advocates of this proposal cite the need to synchronize satellite and other systems, such as GPS, Galileo, and GLONASS, which did not exist and were not envisioned when the current system was adopted. They note that leap second insertions can be and have been incorrectly implemented or accounted for. Such errors have to date had localized impact, but they could cause serious mishaps involving loss of life. For example, some GPS receivers have been known to fail simply because there was no leap second after a long enough interval, other GPS receivers failed because the leap second information was broadcast more than three months in advance, and some commercial software used for internet time-transfer Network Time Protocol (NTP) could either discard all data received after a leap second or interpret it as a frequency change. The ambiguity associated with the extra second could also disrupt financial accounting and certain forms of encryption. Those opposed to the proposal question the need for a change, and also point out the costs of adjusting to the proposed change and its inconvenience to amateur astronomers and others who rely upon astronomical calculations published in advance. Reports have been circulated that the cost of checking and correcting software to accommodate the new definition of UTC would be many millions of dollars for some systems. In October 2005 American Astronomical Society asked the ITU for a year's time to study the issue. This commission has

  16. Pickering dry storage - commissioning and initial operation

    Jonjev, S.

    1996-01-01

    Having commissioned all individual conventional and nuclear systems, the first Dry Storage Container (DSC) was loaded with four modules of 17 year cooled irradiated fuel (366 bundles) in the Auxiliary Irradiated Fuel Bay (AIFB) on November 29, 1995. After decontamination of the outer surface, and draining of water, the DSC was transported to the Used Fuel Dry Storage Facility (UFDSF) workshop, where it was vacuum dried, and then the lid was welded on. Following successful radiography test of the lid weld, the DSC was vacuum dried again and backfilled with Helium to a pressure of 930 mbar(a). The Helium leak test showed zero leakage (allowable leak rate is 1x10 -5 cc/sec). Finally, after loose contamination checks were performed and permanent safeguards seals were applied, the DSC was placed in the UFDSF storage area on January 23, 1996. Radiation fields at contact with the DSC surface were < 0.6 mrem/hr, and at the exterior surface of the storage building wall only 33 micro-rem/hr (far below the target of 250 micro-rem/hr). Therefore, the actual dose rates to general public (at the exclusion zone boundary) will be well below the design target of 1 % of the regulatory limit. (author). 3 refs., 2 tabs., 5 figs

  17. Pickering dry storage - commissioning and initial operation

    Jonjev, S [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station

    1997-12-31

    Having commissioned all individual conventional and nuclear systems, the first Dry Storage Container (DSC) was loaded with four modules of 17 year cooled irradiated fuel (366 bundles) in the Auxiliary Irradiated Fuel Bay (AIFB) on November 29, 1995. After decontamination of the outer surface, and draining of water, the DSC was transported to the Used Fuel Dry Storage Facility (UFDSF) workshop, where it was vacuum dried, and then the lid was welded on. Following successful radiography test of the lid weld, the DSC was vacuum dried again and backfilled with Helium to a pressure of 930 mbar(a). The Helium leak test showed zero leakage (allowable leak rate is 1x10{sup -5} cc/sec). Finally, after loose contamination checks were performed and permanent safeguards seals were applied, the DSC was placed in the UFDSF storage area on January 23, 1996. Radiation fields at contact with the DSC surface were < 0.6 mrem/hr, and at the exterior surface of the storage building wall only 33 micro-rem/hr (far below the target of 250 micro-rem/hr). Therefore, the actual dose rates to general public (at the exclusion zone boundary) will be well below the design target of 1 % of the regulatory limit. (author). 3 refs., 2 tabs., 5 figs.

  18. Commissioning plans for SSC linac

    Hurd, J.W.; Aprile, R.L.; Chang, C.R.; Crist, C.E.; Cutler, R.I.; Funk, L.W.; Guy, F.W.; Leifeste, G.T.; Raparia, D.; Saadatmand, K.; Sethi, R.C.; Swenson, D.A.; Tooker, J.; Yao, C.G.

    1992-01-01

    Presented are the general description of the SSC linac and the plans for commissioning. Sections of the linac are installed, tested, and beam commissioned in a serial approach. A specialized set of diagnostics is used to characterize the beam through each section. In addition to the standard diagnostic set, plans call for the use of a bunch shape monitor and x-ray spectrometer. Streak camera and digital imaging diagnostics will be developed. The commissioning plan is folded into the general linac project schedule to show the relation between delivery, staging, installation, conditioning, and actual commissioning with beam. These plans form the basis for coordination between the various organizations responsible for different elements of the linac including the technical components, infrastructure, and temporary staging and operation facilities. (Author) 2 figs., 17 refs

  19. Bay of Fundy

    2006-01-01

    The highest tides on Earth occur in the Minas Basin, the eastern extremity of the Bay of Fundy, Nova Scotia, Canada, where the tide range can reach 16 meters when the various factors affecting the tides are in phase. The primary cause of the immense tides of Fundy is a resonance of the Bay of Fundy-Gulf of Maine system. The system is effectively bounded at this outer end by the edge of the continental shelf with its approximately 40:1 increase in depth. The system has a natural period of approximately 13 hours, which is close to the 12h25m period of the dominant lunar tide of the Atlantic Ocean. Like a father pushing his daughter on a swing, the gentle Atlantic tidal pulse pushes the waters of the Bay of Fundy-Gulf of Maine basin at nearly the optimum frequency to cause a large to-and-fro oscillation. The greatest slosh occurs at the head (northeast end) of the system. The high tide image (top) was acquired April 20, 2001, and the low tide image (bottom) was acquired September 30, 2002. The images cover an area of 16.5 by 21 km, and are centered near 64 degrees west longitude and 45.5 degrees north latitude. With its 14 spectral bands from the visible to the thermal infrared wavelength region, and its high spatial resolution of 15 to 90 meters (about 50 to 300 feet), ASTER images Earth to map and monitor the changing surface of our planet. ASTER is one of five Earth-observing instruments launched December 18, 1999, on NASA's Terra satellite. The instrument was built by Japan's Ministry of Economy, Trade and Industry. A joint U.S./Japan science team is responsible for validation and calibration of the instrument and the data products. The broad spectral coverage and high spectral resolution of ASTER provides scientists in numerous disciplines with critical information for surface mapping, and monitoring of dynamic conditions and temporal change. Example applications are: monitoring glacial advances and retreats; monitoring potentially active volcanoes; identifying

  20. USGS Tampa Bay Pilot Study

    Yates, K.K.; Cronin, T. M.; Crane, M.; Hansen, M.; Nayeghandi, A.; Swarzenski, P.; Edgar, T.; Brooks, G.R.; Suthard, B.; Hine, A.; Locker, S.; Willard, D.A.; Hastings, D.; Flower, B.; Hollander, D.; Larson, R.A.; Smith, K.

    2007-01-01

    Many of the nation's estuaries have been environmentally stressed since the turn of the 20th century and will continue to be impacted in the future. Tampa Bay, one the Gulf of Mexico's largest estuaries, exemplifies the threats that our estuaries face (EPA Report 2001, Tampa Bay Estuary Program-Comprehensive Conservation and Management Plan (TBEP-CCMP)). More than 2 million people live in the Tampa Bay watershed, and the population constitutes to grow. Demand for freshwater resources, conversion of undeveloped areas to resident and industrial uses, increases in storm-water runoff, and increased air pollution from urban and industrial sources are some of the known human activities that impact Tampa Bay. Beginning on 2001, additional anthropogenic modifications began in Tampa Bat including construction of an underwater gas pipeline and a desalinization plant, expansion of existing ports, and increased freshwater withdrawal from three major tributaries to the bay. In January of 2001, the Tampa Bay Estuary Program (TBEP) and its partners identifies a critical need for participation from the U.S. Geological Survey (USGS) in providing multidisciplinary expertise and a regional-scale, integrated science approach to address complex scientific research issue and critical scientific information gaps that are necessary for continued restoration and preservation of Tampa Bay. Tampa Bay stakeholders identified several critical science gaps for which USGS expertise was needed (Yates et al. 2001). These critical science gaps fall under four topical categories (or system components): 1) water and sediment quality, 2) hydrodynamics, 3) geology and geomorphology, and 4) ecosystem structure and function. Scientists and resource managers participating in Tampa Bay studies recognize that it is no longer sufficient to simply examine each of these estuarine system components individually, Rather, the interrelation among system components must be understood to develop conceptual and

  1. National Capital Planning Commission Meeting Transcripts

    National Capital Planning Commission — Transcripts of the monthly (with the exception of August) National Capital Planning Commission meeting transcripts are provided for research to confirm actions taken...

  2. Lavaca Bay 1985-1987

    National Oceanic and Atmospheric Administration, Department of Commerce — Samples were collected from October 15, 1985 through June 12, 1987 in emergent marsh and non-vegetated habitats throughout the Lavaca Bay system to characterize...

  3. FL BAY SPECTROUT-DIET

    National Oceanic and Atmospheric Administration, Department of Commerce — Juvenile spotted seatrout and other sportfish are being monitored annually over a 6-mo period in Florida Bay to assess their abundance over time relative to...

  4. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    2010-03-10

    ... the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2, 2010. The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold...

  5. Commission Conditions d'emploi

    Staff Association

    2017-01-01

    Au CERN, nous avons la formidable possibilité d’imaginer nos CONDITIONS D’EMPLOIS. Rendez-vous compte ! Nous avons le pouvoir de proposer des idées et de les défendre pour avoir des conditions d’emplois qui soient les plus attractives possibles pour le personnel en place et à venir. ---------------- L’Association du personnel du CERN, tout le monde connait ou en a entendu parler. Ce qui est moins connu, ce sont les diverses commissions internes qui traitent des sujets propres à défendre les intérêts du personnel. Les publications dans notre journal, l’Echo, sont un des moyens à notre disposition pour vous faire découvrir chacune des commissions internes de l’Association du personnel (voir Echo n°242 sur la commission juridique, et Echo n°255 sur la commission des cas particuliers). Commission Conditions d&...

  6. National Bioethics Commissions as Educators.

    Lee, Lisa M

    2017-05-01

    As has become tradition, executive directors of United States' presidential bioethics committees offer reflections about their experience shortly after the orderly shutdown of the commission staff. After the records are filed according to government records regulations; after all the staff members, who are hired into temporary positions that must be renewed every two years, have secured permanent employment; after preparations are made to ensure that the next commission staff (should there be one) has a budget and standard operating procedures in order to begin its work in a timely manner; after the lights are turned out for the last time, the executive director makes the final climb up the stairs into the sunlight and reflects on the whirlwind. There is much about my work with the Presidential Commission for the Study of Bioethical Issues that deserves comment, but one aspect of the commission that has been especially valuable to me is its work to educate the nation on bioethical issues. This is, moreover, a contribution in which the commission staff was central, and it is one that, as an ethics educator myself, I will cherish deeply. © 2017 The Hastings Center.

  7. Recent results from Daya Bay

    Chua Ming-chung

    2016-01-01

    Full Text Available Utilizing powerful nuclear reactors as antineutrino sources, high mountains to provide ample shielding from cosmic rays in the vicinity, and functionally identical detectors with large target volume for near-far relative measurement, the Daya Bay Reactor Neutrino Experiment has achieved unprecedented precision in measuring the neutrino mixing angle θ13 and the neutrino mass squared difference |Δm2ee|. I will report the latest Daya Bay results on neutrino oscillations and light sterile neutrino search.

  8. The environmental aspects of a tidal power project in the upper reaches of the Bay Fundy

    Gordon, D.C.; Longhurst, A.R.

    1979-02-01

    A recommendation for pre-investment design studies for a tidal power development in the Cumberland Basin region of the Bay of Fundy has been made by the Bay of Fundy Tidal Power Review Board and is backed by Canadian provincial and federal governments. A brief history of regional tidal power proposals is presented, and procedures for determining the environmental impacts of the project are outlined. Possible environmental consequences of tidal power development can be hypothesized, but the existing environmental data base is sparse. Investigations are presently being expanded by university and governmental scientists, and specific impact assessment studies will be commissioned if the project is authorized to proceed. (1 map, 11 references)

  9. Commissioning of the ATLAS Experiment

    AUTHOR|(CDS)2069446

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focusing on simultaneous running and combined track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  10. Surrogacy commissioning fathers and HIV

    Jordaan, D W

    2014-01-01

    Surrogacy is not regulated by a single legal instrument only, nor is confirmation of a surrogacy agreement by the High Court an unqualified green light for the surrogacy process to proceed. In the context of the HIV status of the commissioning father, whose gametes are to be used for the conception of the child in pursuance of a surrogacy agreement, the intended in vitro fertilisation of the surrogate mother may only take place on condition that the commissioning father, and his semen, have b...

  11. 47 CFR 1.1528 - Commission review.

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commission review. 1.1528 Section 1.1528... Commission review. Either the applicant or Bureau counsel may seek Commission review of the initial decision on the application, or the Commission may decide to review the decision on its own initiative, in...

  12. LHC Commissioning and First Operation

    Myers, S

    2010-01-01

    A description is given of the repair of the LHC after the accident of September 2008. The LHC hardware and beam commissioning and initial operation are reviewed both in terms of beam and hardware performance. The implemented machine protection measures and their impact on LHC operation are presented.

  13. Commissioning Leibstadt nuclear power plant

    Roeder, A.; Degen, R.; Nedelko, U.

    1985-01-01

    This paper describes the experience and benefits obtained from the use of temporary oil fired boilers of sufficient capacity to allow commissioning and no-load tests to be carried out on the turbine-generator months ahead of steam being available from the NSSS. The successful result at Leibstadt may be a model for other plants

  14. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    D. Acosta

    The commissioning effort is presently addressing two main areas: the commissioning of the hardware components at the pit and the coordination of the activities of the newly constituted Detector Performance groups (DPGs). At point 5, a plan regarding the service cavern and the commissioning of the connections of the off-detector electronics (for the data collection line and trigger primitive generation) to the central DAQ and the central Trigger has been defined. This activity was started early February and will continue until May. It began with Tracker electronics followed so far by HCAL and CSC. The goal is to have by May every detector commission, as much as possible, their data transfer paths from FED to Central DAQ as well as their trigger setups between TPGs and Global Level 1 trigger. The next focus is on connections of front-ends to the service cavern. This depends strongly on the installations of services. Presently the only detector which has its link fibers connected to the off-detector electr...

  15. 33 CFR 100.919 - International Bay City River Roar, Bay City, MI.

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false International Bay City River Roar, Bay City, MI. 100.919 Section 100.919 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... Bay City River Roar, Bay City, MI. (a) Regulated Area. A regulated area is established to include all...

  16. 33 CFR 162.125 - Sturgeon Bay and the Sturgeon Bay Ship Canal, Wisc.

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Sturgeon Bay and the Sturgeon Bay Ship Canal, Wisc. 162.125 Section 162.125 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PORTS AND WATERWAYS SAFETY INLAND WATERWAYS NAVIGATION REGULATIONS § 162.125 Sturgeon Bay and the Sturgeon Bay Ship...

  17. 77 FR 38488 - Safety Zone; Alexandria Bay Chamber of Commerce, St. Lawrence River, Alexandria Bay, NY

    2012-06-28

    ... 1625-AA00 Safety Zone; Alexandria Bay Chamber of Commerce, St. Lawrence River, Alexandria Bay, NY... restrict vessels from a portion of the St. Lawrence River during the Alexandria Bay Chamber of Commerce... of proposed rulemaking (NPRM) entitled Safety Zone; Alexandria Bay Chamber of Commerce, St. Lawrence...

  18. Humboldt Bay, California Benthic Habitats 2009 Geodatabase

    National Oceanic and Atmospheric Administration, Department of Commerce — Humboldt Bay is the largest estuary in California north of San Francisco Bay and represents a significant resource for the north coast region. Beginning in 2007 the...

  19. Humboldt Bay Benthic Habitats 2009 Aquatic Setting

    National Oceanic and Atmospheric Administration, Department of Commerce — Humboldt Bay is the largest estuary in California north of San Francisco Bay and represents a significant resource for the north coast region. Beginning in 2007 the...

  20. San Francisco Bay Water Quality Improvement Fund

    EPAs grant program to protect and restore San Francisco Bay. The San Francisco Bay Water Quality Improvement Fund (SFBWQIF) has invested in 58 projects along with 70 partners contributing to restore wetlands, water quality, and reduce polluted runoff.,

  1. South Bay Salt Pond Mercury Studies Project

    Information about the SFBWQP South Bay Salt Pond Mercury Studies Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  2. Humboldt Bay, California Benthic Habitats 2009 Substrate

    National Oceanic and Atmospheric Administration, Department of Commerce — Humboldt Bay is the largest estuary in California north of San Francisco Bay and represents a significant resource for the north coast region. Beginning in 2007 the...

  3. Humboldt Bay, California Benthic Habitats 2009 Geoform

    National Oceanic and Atmospheric Administration, Department of Commerce — Humboldt Bay is the largest estuary in California north of San Francisco Bay and represents a significant resource for the north coast region. Beginning in 2007 the...

  4. Contaminant transport in Massachusetts Bay

    Butman, Bradford

    Construction of a new treatment plant and outfall to clean up Boston Harbor is currently one of the world's largest public works projects, costing about $4 billion. There is concern about the long-term impact of contaminants on Massachusetts Bay and adjacent Gulf of Maine because these areas are used extensively for transportation, recreation, fishing, and tourism, as well as waste disposal. Public concern also focuses on Stellwagen Bank, located on the eastern side of Massachusetts Bay, which is an important habitat for endangered whales. Contaminants reach Massachusetts Bay not only from Boston Harbor, but from other coastal communities on the Gulf of Maine, as well as from the atmosphere. Knowledge of the pathways, mechanisms, and rates at which pollutants are transported throughout these coastal environments is needed to address a wide range of management questions.

  5. Bayes linear statistics, theory & methods

    Goldstein, Michael

    2007-01-01

    Bayesian methods combine information available from data with any prior information available from expert knowledge. The Bayes linear approach follows this path, offering a quantitative structure for expressing beliefs, and systematic methods for adjusting these beliefs, given observational data. The methodology differs from the full Bayesian methodology in that it establishes simpler approaches to belief specification and analysis based around expectation judgements. Bayes Linear Statistics presents an authoritative account of this approach, explaining the foundations, theory, methodology, and practicalities of this important field. The text provides a thorough coverage of Bayes linear analysis, from the development of the basic language to the collection of algebraic results needed for efficient implementation, with detailed practical examples. The book covers:The importance of partial prior specifications for complex problems where it is difficult to supply a meaningful full prior probability specification...

  6. With Prudhoe Bay in decline

    Davis, J.M.; Pollock, J.R.

    1992-01-01

    Almost every day, it seems, someone is mentioning Prudhoe Bay---its development activities, the direction of its oil production, and more recently its decline rate. Almost as frequently, someone is mentioning the number of companies abandoning exploration in Alaska. The state faces a double-edged dilemma: decline of its most important oil field and a diminished effort to find a replacement for the lost production. ARCO has seen the Prudhoe Bay decline coming for some time and has been planning for it. We have reduced staff, and ARCO and BP Exploration are finding cost-effective ways to work more closely together through such vehicles as shared services. At the same time, ARCO is continuing its high level of Alaskan exploration. This article will assess the future of Prudhoe Bay from a technical perspective, review ARCO's exploration plans for Alaska, and suggest what the state can do to encourage other companies to invest in this crucial producing region and exploratory frontier

  7. Christchurch Bay Tower data archive. Principal report

    Bishop, J.R.

    1998-05-01

    Wave force experiments at the Christchurch Bay Tower yielded valuable data on wave forces on cylinders under the complex flows experienced in real sea conditions. The last experiments were conducted in 1987, but the data remain an important source of information on the wave forces on cylinders, together with the measured wave particle kinematics. The use of two columns with different diameters enabled the studies to extend over a large range of Keulegan Carpenter numbers and Reynolds numbers. The experiments included clean vertical and horizontal cylinders, cylinders with real kelp fouling, with simulated hard roughness and a flexible cylinder. Considerable effort was devoted to quality control of the measured data. The experiments were funded mainly by the UK Department of Energy, and ownership of the results has now been transferred to the Offshore Safety Division of the Health and Safety Executive. They have now commissioned the archiving of a set of important records from the experiments, covering clean cylinders, kelp fouling, hard roughness and a horizontal cylinder. The purpose is to make the data available for future work on wave loadings and the related wave particle kinematics. The raw measured data are not usable without specialist decoding, calibration and certain pre-processing tasks. So, in this archiving work, the data have been processed into parameters such as 2 axis forces and 3 axis wave kinematics. As a result of this archiving project the data are available on CD ROM. (author)

  8. LHC: Construction and Commissioning Status

    Evans, Lyndon R

    2007-01-01

    The installation of the Large Hadron Collider at CERN is now approaching completion. All magnets are installed with the exception of a few inner triplet quadrupoles. The first of the eight machine sectors is cold and power tests are proceeding. Two other sectors are ready for cool down and interconnect work is proceeding at a satisfactory pace in the other five sectors. In view of a number of accumulated delays, the original plan for partial commissioning of the machine and a low energy pilot run at the end of 2007 will now have to be abandoned. Instead, the full commissioning of the machine to top energy in a single step will start once the injector chain becomes available in spring 2008.

  9. Distribution and behavior of major and trace elements in Tokyo Bay, Mutsu Bay and Funka Bay marine sediments

    Honda, Teruyuki; Kimura, Ken-ichiro

    2003-01-01

    Fourteen major and trace elements in marine sediment core samples collected from the coasts along eastern Japan, i.e. Tokyo Bay (II) (the recess), Tokyo Bay (IV) (the mouth), Mutsu Bay and Funka Bay and the Northwest Pacific basin as a comparative subject were determined by the instrumental neutron activation analysis (INAA). The sedimentation rates and sedimentary ages were calculated for the coastal sediment cores by the 210 Pb method. The results obtained in this study are summarized as follows: (1) Lanthanoid abundance patterns suggested that the major origin of the sediments was terrigenous material. La*/Lu* and Ce*/La* ratios revealed that the sediments from Tokyo Bay (II) and Mutsu Bay more directly reflected the contribution from river than those of other regions. In addition, the Th/Sc ratio indicated that the coastal sediments mainly originated in the materials from the volcanic island-arcs, Japanese islands, whereas those from the Northwest Pacific mainly from the continent. (2) The correlation between the Ce/U and Th/U ratios with high correlation coefficients of 0.920 to 0.991 indicated that all the sediments from Tokyo Bay (II) and Funka Bay were in reducing conditions while at least the upper sediments from Tokyo Bay (IV) and Mutsu Bay were in oxidizing conditions. (3) It became quite obvious that the sedimentation mechanism and the sedimentation environment at Tokyo Bay (II) was different from those at Tokyo Bay (IV), since the sedimentation rate at Tokyo Bay (II) was approximately twice as large as that at Tokyo Bay (IV). The sedimentary age of the 5th layer (8∼10 cm in depth) from Funka Bay was calculated at approximately 1940∼50, which agreed with the time, 1943∼45 when Showa-shinzan was formed by the eruption of the Usu volcano. (author)

  10. Mobile Bay turbidity plume study

    Crozier, G. F.

    1976-01-01

    Laboratory and field transmissometer studies on the effect of suspended particulate material upon the appearance of water are reported. Quantitative correlations were developed between remotely sensed image density, optical sea truth data, and actual sediment load. Evaluation of satellite image sea truth data for an offshore plume projects contours of transmissivity for two different tidal phases. Data clearly demonstrate the speed of change and movement of the optical plume for water patterns associated with the mouth of Mobile bay in which relatively clear Gulf of Mexico water enters the bay on the eastern side. Data show that wind stress in excess of 15 knots has a marked impact in producing suspended sediment loads.

  11. Automation in tube finishing bay

    Bhatnagar, Prateek; Satyadev, B.; Raghuraman, S.; Syama Sundara Rao, B.

    1997-01-01

    Automation concept in tube finishing bay, introduced after the final pass annealing of PHWR tubes resulted in integration of number of sub-systems in synchronisation with each other to produce final cut fuel tubes of specified length, tube finish etc. The tube finishing bay which was physically segregated into four distinct areas: 1. tube spreader and stacking area, 2. I.D. sand blasting area, 3. end conditioning, wad blowing, end capping and O.D. wet grinding area, 4. tube inspection, tube cutting and stacking area has been studied

  12. Guidance on future art commissioning.

    2009-05-01

    Delegates at Building Better Healthcare's recent "National Patient Environment and the Arts Conference 2009" in London heard how national public arts think tank ixia has appointed Bristol-based arts and wellbeing development agency Willis Newson to write "concise and convincing guidance" on commissioning art for new healthcare facilities. A key message, during a joint presentation, was that integrating artwork into hospitals and other healthcare premises requires the earliest possible consideration to reap the maximum rewards.

  13. Chesapeake Bay plume dynamics from LANDSAT

    Munday, J. C., Jr.; Fedosh, M. S.

    1981-01-01

    LANDSAT images with enhancement and density slicing show that the Chesapeake Bay plume usually frequents the Virginia coast south of the Bay mouth. Southwestern (compared to northern) winds spread the plume easterly over a large area. Ebb tide images (compared to flood tide images) show a more dispersed plume. Flooding waters produce high turbidity levels over the shallow northern portion of the Bay mouth.

  14. Default Bayes factors for ANOVA designs

    Rouder, Jeffrey N.; Morey, Richard D.; Speckman, Paul L.; Province, Jordan M.

    2012-01-01

    Bayes factors have been advocated as superior to p-values for assessing statistical evidence in data. Despite the advantages of Bayes factors and the drawbacks of p-values, inference by p-values is still nearly ubiquitous. One impediment to the adoption of Bayes factors is a lack of practical

  15. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    T. Camporesi

    The major progress made during the last months has been in the consolidation of services for the +endcaps and three barrel wheels (YB+2, YB+1 and YB0): all subdetectors have now final power connections (including Detector Safety protection), the gas systems have been commissioned for all gas detectors (the recirculation is not yet activated for the RPC though) and detector cooling has also been commissioned. Their integration with final services is the necessary condition for being able to operate larger fractions the detector. Recent weeks have seen full HCAL, more than 50% of EB and full wheels of DTs and CSC being operated using final services. This has not yet translated into major progress of global integration due to major interruptions of central services, which have not allowed the necessary debugging and commissioning time to all the subdetec¬tors and central activities like DAQ and trigger. Moreover the running in of the final central services has introduced instabilities related to the co...

  16. Report of the disarmament commission

    1991-07-01

    At its forty-fifth session, the General Assembly adopted resolution 45/62 B of 4 December 1990, entitled ''Report of the Disarmament Commission'', by which the Assembly, inter alia: notes that no consensus could be reached on specific recommendations for the item regarding various aspects of the arms race, particularly the nuclear-arms race and nuclear disarmament, as well as a general approach to negotiations on nuclear and conventional disarmament; Working Group II on agenda item 5 of the United Nations Disarmament Commission, entitled ''Process of nuclear disarmament in the framework of international peace and security, with the objective of the elimination of nuclear weapons'', held 11 meetings during the 1991 substantive session of the Disarmament Commission which were preceded by a number of rounds of informal consultations conducted by the Chairman. A structure of work which would serve as a guideline for the work of the Group, while at the same time maintaining the general nature of the desired approach was agreed to by the Group; it included the following four items: 1. The relationship between the process of nuclear disarmament and international peace and security; 2. Review of the steps taken in the process of nuclear disarmament; 3. Strengthening the process of nuclear disarmament, necessary conditions, and mechanisms required for it; 4. The role of the United Nations system in the process of nuclear disarmament with the objective of the elimination of nuclear weapons

  17. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    T. Camporesi

    P5 Commissioning activities The commissioning effort at the pit has made major progress since the last CMS week concerning the installation and operation of the off-detector electronics in USC. The progress has been much slower in the experi¬mental cavern due to the delay in the deployment of the infrastructure which should eventually allow safe powering-up of the front ends. Nevertheless, temporary power connections have allowed operation of slices of subdetectors at any given time. HF, HE, ECAL, DTs, RPCs and CSCs have carried out local commissioning tests with these temporary services. The status of hardware deployment in USC and on the towers/balconies is represented in the detailed table below.   Table 1: Status of installation of off-detector electronics. FEDs are detector dependent hardware modules which perform the first ‘colla¬tion’ of front-end data and send it to Central-data for event building. Tracker, ECAL, HCAL have their front end electronics mo...

  18. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    D. Acosta

    The global commissioning campaign begins this year with a series of weekly two-day global runs of limited participation until mid-March. The aim of these runs varies week-to-week, but includes the commissioning the calorimeter triggers, the muon track-finder triggers in the DT/CSC overlap, the PLL locking ranges, and generally accumulating data either for HCAL noise characterization or detector studies with cosmic muons. In mid-March a full Global Run is scheduled with all components participating, followed in April by a Cosmic Run with the aim of collecting statistics over a couple weeks with the installed Tracker and other subsystems. The ultimate milestone is the Cosmic Run At Four Tesla (CRAFT), with a completed CMS closed and the solenoid energized for data-taking during June. The Detector Performance Groups start the year with the focus to prepare for LHC collisions, and the associated challenges (CSA08) and global commissioning exercises (CRAFT) along the way. New this year is the addition of the Tri...

  19. Unit Commissioning of “Belene” NPP (Bulgaria)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  20. Radiological dose to man through the marine pathway from reactor operations at Humboldt Bay, California

    Noshkin, V.E.; Robison, W.L.; Harrison, F.L.

    1976-01-01

    Source-strength measurements and environmental samples taken at the Humboldt Bay Nuclear Reactor site near Eureka, California, since mid-1971 were used to evaluate the potential dose to man resulting from an aquatic release of radioactivity from the reactor. In this report, we provide an evaluation of individual and population dose through the marine pathways during 1972 and 1973 computed by the methods recommended by the U.S. Nuclear Regulatory Commission

  1. Alaska Public Offices Commission, Department of Administration, State of

    Visiting Alaska State Employees State of Alaska Department of Administration Alaska Public Offices Commission Alaska Department of Administration, Alaska Public Offices Commission APOC Home Commission Filer ; AO's Contact Us Administration > Alaska Public Offices Commission Alaska Public Offices Commission

  2. Classification using Hierarchical Naive Bayes models

    Langseth, Helge; Dyhre Nielsen, Thomas

    2006-01-01

    Classification problems have a long history in the machine learning literature. One of the simplest, and yet most consistently well-performing set of classifiers is the Naïve Bayes models. However, an inherent problem with these classifiers is the assumption that all attributes used to describe......, termed Hierarchical Naïve Bayes models. Hierarchical Naïve Bayes models extend the modeling flexibility of Naïve Bayes models by introducing latent variables to relax some of the independence statements in these models. We propose a simple algorithm for learning Hierarchical Naïve Bayes models...

  3. Latest results from Daya Bay

    Vorobel, Vit; Daya Bay Collaboration

    2017-07-01

    The Daya Bay Reactor Neutrino Experiment was designed to measure θ 13, the smallest mixing angle in the three-neutrino mixing framework, with unprecedented precision. The experiment consists of eight functionally identical detectors placed underground at different baselines from three pairs of nuclear reactors in South China. Since Dec. 2011, the experiment has been running stably for more than 4 years, and has collected the largest reactor anti-neutrino sample to date. Daya Bay is able to greatly improve the precision on θ 13 and to make an independent measurement of the effective mass splitting in the electron antineutrino disappearance channel. Daya Bay can also perform a number of other precise measurements, such as a high-statistics determination of the absolute reactor antineutrino flux and spectrum, as well as a search for sterile neutrino mixing, among others. The most recent results from Daya Bay are discussed in this paper, as well as the current status and future prospects of the experiment.

  4. Daya bay reactor neutrino experiment

    Cao Jun

    2010-01-01

    Daya Bay Reactor Neutrino Experiment is a large international collaboration experiment under construction. The experiment aims to precisely determine the neutrino mixing angle θ 13 by detecting the neutrinos produced by the Daya Bay Nuclear Power Plant. θ 13 is one of two unknown fundamental parameters in neutrino mixing. Its magnitude is a roadmap of the future neutrino physics, and very likely related to the puzzle of missing antimatter in our universe. The precise measurement has very important physics significance. The detectors of Daya Bay is under construction now. The full operation is expected in 2011. Three years' data taking will reach the designed the precision, to determine sin 2 2θ 13 to better than 0.01. Daya Bay neutrino detector is an underground large nuclear detector of low background, low energy, and high precision. In this paper, the layout of the experiment, the design and fabrication progress of the detectors, and some highlighted nuclear detecting techniques developed in the detector R and D are introduced. (author)

  5. National Capital Planning Commission Library contents

    National Capital Planning Commission — The National Capital Planning Commission library catalog is a compilation of titles, authors, years of publication and topics of books, reports and NCPC publications.

  6. Powers and Duties of Corporate Affairs Commission

    Mofasony

    POWERS AND DUTIES OF THE CORPORATE AFFAIRS. COMMISSION ... The Registrar-General is the Chief Executive of the Commission and is saddled .... Federal Board of Inland Revenue Department of the Ministry of Finance v). Register ...

  7. Atomic Energy Commission Act, 2000 (Act 588)

    2000-01-01

    Act 588 of the Republic of Ghana entitled, Atomic Energy Commission Act, 2000, amends and consolidates the Atomic Energy Commission Act, 204 of 1963 relating to the establishment of the Atomic Energy Commission. Act 588 makes provision for the Ghana Atomic Energy Commission to establish more institutes for the purpose of research in furtherance of its functions and also promote the commercialization of its research and development results. (E.A.A.)

  8. Bioethics commission to review gene patenting

    Rothenburg, L.

    1995-12-01

    In October, in an unexpected development, U.S. President Bill Clinton created a national ethics advisory board, the National Bioethics Advisory Commission (NBAC, Washington, DC), to study both research ethics and the management and use of genetic information. Of particular interest to biotechnology companies and researchers is the fact that the commission`s brief encompasses issues about human gene patenting, a subject not contained in earlier proposals for the commission.

  9. The Industry Commission inquiry into charitable organisations.

    Suter, K

    1996-01-01

    The Industry Commission has carried out Australia's largest inquiry into charities. It was, from the point of view of charities, an unsatisfactory operation, all the more so since it was not clear why the task had been given to the commission. This article examines the commission's work in three ways: the overall relationship between government and charities; the commission's proposed major reforms; and the minor reforms.

  10. Atomic Energy Commission (Amendment) Law, 1993

    1993-02-01

    The Atomic Energy Commission (Amendment) Law, 1993 (P.N.D.C.L. 308) seeks to amend the Atomic Energy Commission Act of 1963 (Act 204) so as to provide for the establishment of a Radiation Protection Board and other institutes under the Ghana Atomic Energy Commission. The Law further repeats the Atomic Energy Commission (Amendment) Law of 1982 (P.N.D.C.L. 37). (EAA)

  11. Nuclear Regulatory Commission 1989 Information Digest

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  12. Commissioning Instrument for the GTC

    Cuevas, S.; Sánchez, B.; Bringas, V.; Espejo, C.; Flores, R.; Chapa, O.; Lara, G.; Chavolla, A.; Anguiano, G.; Arciniega, S.; Dorantes, A.; González, J. L.; Montoya, J. M.; Toral, R.; Hernández, H.; Nava, R.; Devaney, N.; Castro, J.; Cavaller-Marqués, L.

    2005-12-01

    During the GTC integration phase, the Commissioning Instrument (CI) will be a diagnostic tool for performance verification. The CI features four operation modes: imaging, pupil imaging, Curvature WFS, and high resolution Shack-Hartmann WFS. This instrument was built by the Instituto de Astronomía UNAM and the Centro de Ingeniería y Desarrollo Industrial (CIDESI) under GRANTECAN contract after a public bid. In this paper we made a general instrument overview and we show some of the performance final results obtained when the Factory Acceptance tests previous to its transport to La Palma.

  13. 17 CFR 201.57 - Commission review.

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Commission review. 201.57... Regulations Pertaining to the Equal Access to Justice Act § 201.57 Commission review. In accordance with the... Division of the Commission may seek review of the initial decision on the fee application, or the...

  14. Improved Storm Monitoring and Prediction for the San Francisco Bay Area

    Cifelli, R.; Chandrasekar, V.; Anderson, M.; Davis, G.

    2017-12-01

    The Advanced Quantitative Precipitation Information (AQPI) System is a multi-faceted project to improve precipitation and hydrologic monitoring, prediction, and decision support for the San Francisco Bay Area. The Bay Area faces a multitude of threats from extreme events, including disrupted transportation from flooded roads and railroad lines, water management challenges related to storm water, river and reservoir management and storm-related damage demanding emergency response. The threats occur on spatial scales ranging from local communities to the entire region and time scales ranging from hours to days. These challenges will be exacerbated by future sea level rise, more extreme weather events and increased vulnerabilities. AQPI is a collaboration of federal, state and local governments with assistance from the research community. Led by NOAA's Earth System Research Laboratory, in partnership with the Cooperative Institute for Research in the Atmosphere, USGS, and Scripps, AQPI is a four-year effort funded in part by a grant from the California Department of Water Resource's Integrated Regional Water Management Program. The Sonoma County Water Agency is serving as the local sponsor of the project. Other local participants include the Santa Clara Valley Water District, San Francisco Public Utilities Commission, and the Bay Area Flood Protection Agencies Association. AQPI will provide both improved observing capabilities and a suite of numerical forecast models to produce accurate and timely information for benefit of flood management, emergency response, water quality, ecosystem services, water supply and transportation management for the Bay Area. The resulting information will support decision making to mitigate flood risks, secure water supplies, minimize water quality impacts to the Bay from combined sewer overflows, and have improved lead-time on coastal and Bay inundation from extreme storms like Atmospheric Rivers (ARs). The project is expected to

  15. Commissioning of the CEBAF cryomodules

    Drury, M.; Lee, T.; Marshall, J.; Preble, J.; Saulter, Q.; Schneider, W.; Spata, M.; Wiseman, M.

    1993-01-01

    When complete, the Continuous Electron Beam Accelerator Facility will house a 4 GeV recirculating linear accelerator containing 42 1/4 cryomodules arrayed in two antiparallel linacs and an injector. Currently, over half of the cryomodules have been installed. Each cryomodule contains eight superconducting niobium 5-cell rf cavities that operate at 1.497 GHz. A cryomodule must provide an energy gain of 20 MeV to the 200 μA beam. The resultant dynamic heat load must be less than 45 W. The cavity parameters that are measured during the commissioning process include the external Q's of the cavity ports, the unloaded Q (Q 0 ) of the cavity as a function of accelerating gradient, and the maximum operating gradient of the cavity. The sensitivity of the resonant frequency to changes in pressure and gradient is also measured. Finally, the mechanical tuners are cycled and characterized. In all cases, the performance of CEBAF cryomodules has exceeded the design requirements. A portable test stand allows local control of the rf system and provides automated data acquisition. This paper describes the cryomodule commissioning hardware, software, and measurements

  16. Molr - A delegation framework for accelerator commissioning

    Valliappan, Nachiappan

    2017-01-01

    Accelerator commissioning is the process of preparing an accelerator for beam operations. A typical commissioning period at CERN involves running thousands of tests on many complex systems and machinery to ensure smooth beam operations and correct functioning of the machine protection systems. AccTesting is a software framework which helps orchestrate the commissioning of CERN’s accelerators and it’s equipment systems. This involves running and managing tests provided by various commissioning tools and analyzing their outcomes. Currently, AccTesting only supports a specific set of commissioning tools. In this project, we aim to widen the spectrum of commissioning tools supported by AccTesting by developing a generic and programmable integration framework called Molr, which would enable the integration of more commissioning tools with AccTesting. In this report, we summarize the work done during the summer student project and lay out a brief overview of the current status and next steps for Molr.

  17. Nelson River and Hudson Bay

    2002-01-01

    Rivers that empty into large bodies of water can have a significant impact on the thawing of nearshore winter ice. This true-color Moderate Resolution Imaging Spectroradiometer (MODIS) image from May 18, 2001, shows the Nelson River emptying spring runoff from the Manitoba province to the south into the southwestern corner of Canada's Hudson Bay. The warmer waters from more southern latitudes hasten melting of ice near the shore, though some still remained, perhaps because in shallow coastal waters, the ice could have been anchored to the bottom. High volumes of sediment in the runoff turned the inflow brown, and the rim of the retreating ice has taken on a dirty appearance even far to the east of the river's entrance into the Bay. The sediment would have further hastened the melting of the ice because its darker color would have absorbed more solar radiation than cleaner, whiter ice. Image courtesy Jacques Descloitres, MODIS Land Rapid Response Team at NASA GSFC

  18. SERPUKHOV: UNK transfer beamline commissioned

    Anon.

    1994-01-01

    At the end of the 1000 hour February-March run of the 70 GeV proton synchrotron at the Institute for High Energy Physics (IHEP), Serpukhov, near Moscow, the new 2.7-kilometre UNK Beam Transfer Line (BTL) was commissioned with proton beam. BTL will eventually transfer beam from the existing U70 proton accelerator to the first stage of the UNK (UNK-1, now under construction) where it will be accelerated in the 21- kilometre ring up to 600 GeV. BTL was designed for proton energies between 60 and 70 GeV, momentum spread ± 2 x 10 -3 and beam emittance 2 mm.mrad, with systems for fast ejection, beam transfer and injection into UNK-1

  19. Commissioning and operation of DRAGON

    Engel, Sabine

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the 21 Na(p,γ) 22 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of ±20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented

  20. Commissioning and operation of DRAGON

    Engel, S

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the sup 2 sup 1 Na(p,gamma) sup 2 sup 2 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of +-20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented.

  1. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    T. Camporesi

    The central commissioning activities have concentrated mostly in the Service cavern. Since early February the central DAQ has been ready to accept connections from FEDs from the various partitions. This has triggered a campaign from all subdetectors to install their readout crates in USC55. Systematic tests of the connections between FEDs and Central DAQ have been scheduled and to date more than 70% of all FED connections have been successfully tested from almost all subdetectors. In March the Level 1 trigger team started deployment of their hardware followed by a campaign of testing the connections between Trigger primitive generators and the corresponding LV1 hardware (Regional Calorimeter Trigger and Global Muon Trigger). The functionality tests are continuing to date by pattern tests of increasing complexity. In April the central DAQ was ready to start FED system tests, which amounts to testing the data reading and trans¬fer-ability from the FEDs to the Filter Units (with or without an actual ...

  2. Division A Commission 31: Time

    Hosokawa, Mizuhiko; Arias, Elisa Felicitas; Manchester, Richard; Tuckey, Philip; Matsakis, Demetrios; Zhang, Shougang; Zharov, Vladimir

    2016-04-01

    Time is an essential element of fundamental astronomy. In recent years there have been many time-related issues, in scientific and technological aspects as well as in conventions and definitions. At the Commission 31 (Time) business meeting at the XXIX General Assembly, recent progress and many topics, including Pulsar Time Scales WG and Future UTC WG activities, were reviewed and discussed. In this report, we will review the progress of these topics in the past three years. There are many remarkable topics, such as Time scales, Atomic clock development, Time transfer, Future UTC and future redefinition of the second. Among them, scientific highlights are the progress of pulsar time scales and the optical frequency standards. On the other hand, as the social convention, change in the definition of UTC and the second is important.

  3. Spill management strategy for the Chesapeake Bay

    Butler, H.L.; Chapman, R.S.; Johnson, B.H.

    1990-01-01

    The Chesapeake Bay Program is a unique cooperative effort between state and Federal agencies to restore the health and productivity of America's largest estuary. To assist in addressing specific management issues, a comprehensive three-dimensional, time-varying hydrodynamic and water quality model has ben developed. The Bay modeling strategy will serve as an excellent framework for including submodules to predict the movement, dispersion, and weathering of accidental spills, such as for petroleum products or other chemicals. This paper presents sample results from the Bay application to illustrate the success of the model system in simulating Bay processes. Also, a review of model requirements for successful spill modeling in Chesapeake Bay is presented. Recommendations are given for implementing appropriate spill modules with the Bay model framework and establishing a strategy for model use in addressing management issues

  4. 75 FR 8297 - Tongass National Forest, Thorne Bay Ranger District, Thorne Bay, AK

    2010-02-24

    ..., Thorne Bay, AK AGENCY: Forest Service, USDA. ACTION: Cancellation of Notice of intent to prepare an... Roberts, Zone Planner, Thorne Bay Ranger District, Tongass National Forest, P.O. Box 19001, Thorne Bay, AK 99919, telephone: 907-828-3250. SUPPLEMENTARY INFORMATION: The 47,007-acre Kosciusko Project Area is...

  5. 77 FR 44140 - Drawbridge Operation Regulation; Sturgeon Bay Ship Canal, Sturgeon Bay, WI

    2012-07-27

    ... Maple-Oregon Bridges so vehicular traffic congestion would not develop on downtown Sturgeon Bay streets... movement of vehicular traffic in Sturgeon Bay. The Sturgeon Bay Ship Canal is approximately 8.6 miles long... significant increase in vehicular and vessel traffic during the peak tourist and navigation season between...

  6. The onset of deglaciation of Cumberland Bay and Stromness Bay, South Georgia

    Van Der Putten, N.; Verbruggen, C.

    Carbon dating of basal peat deposits in Cumberland Bay and Stromness Bay and sediments from a lake in Stromness Bay, South Georgia indicates deglaciation at the very beginning of the Holocene before c. 9500 14C yr BP. This post-dates the deglaciation of one local lake which has been ice-free since

  7. 78 FR 46813 - Safety Zone; Evening on the Bay Fireworks; Sturgeon Bay, WI

    2013-08-02

    ...-AA00 Safety Zone; Evening on the Bay Fireworks; Sturgeon Bay, WI AGENCY: Coast Guard, DHS. ACTION.... This temporary safety zone will restrict vessels from a portion of Sturgeon Bay due to a fireworks... hazards associated with the fireworks display. DATES: This rule is effective from 8 p.m. until 10 p.m. on...

  8. The Commissioning of the LHC Technical Systems

    Saban, R; Baggiolini, V; Ballarino, A; Barbero-Soto, E; Bellesia, B; Bordry, Frederick; Bozzini, D; Casas-Lino, M-P; Chareyre, V; Claudet, S; Coelingh, G-J; Dahlerup-Petersen, K; Denz, R; Fehér, S; Flora, R; Gruwé, M; Kain, V; Kirby, G; Koratzinos, M; Lauckner, R; Le Naour, S; Mess, K-H; Millet, F; Montabonnet, V; Nisbet, D; Perea-Solano, B; Pojer, M; Principe, R; Rabehl, R; Rijllart, A; Redaelli, S; Rodríguez-Mateos, F; Schmidt, R; Serio, L; Siemko, A; Solfaroli-Camillocci, M; Thiesen, H; Venturini, W; Vergara-Fernandez, A; Verweij, A; Zerlauth, M

    2007-01-01

    The LHC is an accelerator with unprecedented complexity where the energy stored in magnets and the beams exceeds other accelerators by one-to-two orders of magnitude. To ensure a safe and efficient machine start-up without being plagued by technical problems, a phase of "hardware commissioning" was introduced: a thorough commissioning of technical systems without beam. This activity started in June 2005 with the commissioning of individual systems, followed by operating a full sector, one eighth of the machine; the commissioning is expected to last until spring 2008 when commissioning with beam will start. The LHC architecture allows the commissioning of each of the eight sectors independently from the others, before the installation of other sectors is complete. An important effort went into the definition of the programme and the organization of the coordination in the field, as well as in the preparation of the tools to record and analyze test results. This paper discusses the experience with this approach...

  9. Nuclear Regulatory Commission issuances, October 1993

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners' motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners' have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission's Memorandum and Order are included

  10. Large Hadron Collider commissioning and first operation.

    Myers, S

    2012-02-28

    A history of the commissioning and the very successful early operation of the Large Hadron Collider (LHC) is described. The accident that interrupted the first commissioning, its repair and the enhanced protection system put in place are fully described. The LHC beam commissioning and operational performance are reviewed for the period from 2010 to mid-2011. Preliminary plans for operation and future upgrades for the LHC are given for the short and medium term.

  11. A Staged Approach to LHC Commissioning

    Lamont, M; Brüning, Oliver Sim; Collier, P; Lauckner, R; Schmidt, R

    2006-01-01

    Effective commissioning of the LHC with beam will demand very good preparation; all concerned subsystems will need to be well-prepared and thoroughly tested before first beam. To clarify the demands on the systems involved the objectives of the commissioning phases are presented, along with a breakdown of the phases and the essential prerequisites for each. The nature of the interdependencies between the various systems is highlighted; in particular the need for a well-planned commissioning of the machine protection system.

  12. Startup and commissioning of pressurized water reactors

    Albert, L.J.; Gilbert, C.F.

    1983-05-01

    A critical phase of plant development is the test, startup, and commissioning period. The effort expended prior to commissioning has a definite effect on the reliability and continuing availability of the plant during its life. This paper describes a test, startup, and commissioning program for a pressurized water reactor (PWR) plant. This program commences with the completion of construction and continues through the turnover of equipment/systems to the owner's startup/ commissioning group. The paper addresses the organization of the test/startup group, planning and scheduling, test procedures and initial testing, staffing and certification of the test group, training of operators, and turnover to the owner

  13. Federal Energy Regulatory Commission (FERC) Regions

    Department of Homeland Security — Federal Energy Regulatory Commission (FERC) Regions. FERC is an independent agency that regulates the interstate transmission of electricity, natural gas, and oil....

  14. Commissioning of the nuclear power plant

    Furtado, P.M.; Rolf, F.

    1984-01-01

    Nuclear Power Plant Angra 2, located at Itaorna Beach-Angra dos Reis is the first plant of the Brazilian-German Agreement to be commissioned. The Nuclear Power Plant is a pressurized water reactor rated at 3765 Mw thermal/1325 Mw electrical. For commissioning purpose the plant is divided into 110 systems. Plant commissioning objective is to demonstrate the safe and correct operation of each plan component, system and of the whole plant in agreement with design conditions, licensing requirements and contractual obligations. This work gives a description of plant commissioning objectives, activities their time sequence, and documentation. (Author) [pt

  15. Real Estate Agent Commission Disputes

    Anida Duarte

    2015-06-01

    Full Text Available The purpose of this study was to examine the relationship among Procuring Cause Law, real estate agent years of experience, and real estate commission disputes. A pilot survey was conducted in the southwestern United States among real estate agents, realtor(s, and brokers. After testing the hypothesis, the decision was made to fail to reject the hypothesis and conclude that real estate agent experience and not Procuring Cause Law produced favorable outcomes in disputes. As a result, the following recommendations were made: (a Agency seller and buyer’s agreements should be used in each transaction to avoid disputes, (b proper expectations and guidelines should be reviewed prior to starting any real estate transaction, (c a checklist may assist in the assurance that all valuable information is reviewed, (d agents could benefit from fully understanding Procuring Cause Law and sharing this information with their clients, (e state and national regulatory requirements of the law could be modified for easier understanding and use, and (f consumers who willfully violate the law could be subject to monetary penalties.

  16. Application of State of the Art Modeling Techniques to Predict Flooding and Waves for a Coastal Area within a Protected Bay

    Malcolm L. Spaulding

    2017-03-01

    Full Text Available Flood Insurance Rate Maps (FIRMs are developed by the Federal Emergency Management Agency (FEMA to provide guidance in establishing the risk to structures and infrastructure from storm surge sand associated waves in the coastal zone. The maps are used by state agencies and municipalities to help guide coastal planning and establish the minimum elevation and construction standards for new or substantially improved structures. A summary of the methods used and a comparison with the results of 2013 FIRM mapping are presented for Warwick, Rhode Island (RI, a coastal community located within Narragansett Bay. Because of its location, Warwick is protected from significant coastal erosion and wave attacks, but is subject to surge amplification. Concerns surrounding the FEMA methods used in the 2013 FIRM analysis are put in context with the National Research Council’s (NRC 2009 review of the FEMA coastal mapping program. New mapping is then performed using state of the art, fully coupled surge and wave modeling, and data analysis methods, to address the NRC concerns. The new maps and methodologies are in compliance with FEMA regulations and guidelines. This new approach makes extensive use of the numerical modeling results from the recent US Army Corp of Engineers, North Atlantic Coast Comprehensive Study (NACCS, 2015. Revised flooding maps are presented and compared to the 2013 FIRM maps, to provide insight into the differences. The new maps highlight the importance of developing better estimates of surge dynamics and the advancement in nearshore mapping of waves in flood inundated areas by the use of state of the art, two-dimensional, wave transformation models.

  17. Dust settles at Dalrymple Bay Terminal

    2006-01-01

    With an annual loading capacity approaching 60Mt, Queensland's Dalrymple Bay Coal Terminal is one of the largest and most efficient coal export facilities in Australia. Each day, DBCT handles thousands of tonnes of coal transported directly from the Bowen Basin via an electrified railway and bound, ultimately, for out-loading onto bulk carrier ships. It is little wonder then that dust control and an accurate knowledge of coal moisture content are key priorities for DBCT. In early 2004, these priorities, together with an undertaking to the Co-ordinator General to reduce dust emissions, saw DBCT investigate the CSIRO-developed Low Frequency Microwave (LFM) Moisture Analyser. The LFM Analyser is specifically designed to deliver accurate, online measurements of moisture in continuous on-conveyor applications. At this stage, it was already enjoying significant success in the iron ore market with BHP Billiton Iron Ore investing in multiple units as part of its moisture control strategy for the Marra Mamba ore-types. The LFM Analysers, now being commercialised by spin-out company Intalysis, were commissioned in July 2004. Babcock and Brown Infrastructure (BBI), the company that holds the long-term leasehold of DBCT, was heavily involved in the analyser's commissioning. BBI's electrical supervisor Doug Mitchell says the analyser offers the means for DBCT to meet the environmental conditions of the terminal license while at the same time enabling it to meet its individual contract obligations with the terminal customers. 'This basically involves ensuring the moisture content for each coal type does not exceed that which has been agreed upon with terminal customer,' Mitchell says. DBCT has installed two analysers on the in loading conveyors, each about 100m from the coal discharge hoppers. They are fitted to steel cord belts at a nominal speed of around 6m/sec that carry the coal to either 4250tph or 5500tph yard stacking machines, depending on the string selected for

  18. Unique thermal record in False Bay

    Grundlingh, ML

    1993-10-01

    Full Text Available Over the past decade False Bay has assumed a prime position in terms of research in to large South African bays. This is manifested by investigations that cover flow conditions modelling, thermal structure, management, biology and nutrients, geology...

  19. Hierarchical mixtures of naive Bayes classifiers

    Wiering, M.A.

    2002-01-01

    Naive Bayes classifiers tend to perform very well on a large number of problem domains, although their representation power is quite limited compared to more sophisticated machine learning algorithms. In this pa- per we study combining multiple naive Bayes classifiers by using the hierar- chical

  20. Safety culture development at Daya Bay NPP

    Zhang Shanming

    2001-01-01

    From view on Organization Behavior theory, the concept, development and affecting factors of safety culture are introduced. The focuses are on the establishment, development and management practice for safety culture at Daya Bay NPP. A strong safety culture, also demonstrated, has contributed greatly to improving performance at Daya Bay

  1. The Holocene History of Placentia Bay, Newfoundland

    Sheldon, Christina; Seidenkrantz, Marit-Solveig; Reynisson, Njall

    2013-01-01

    Marine sediments analyzed from cores taken in Placentia Bay, Newfoundland, located in the Labrador Sea, captured oceanographic and climatic changes from the end of the Younger Dryas through the Holocene. Placentia Bay is an ideal site to capture changes in both the south-flowing Labrador Current ...

  2. 77 FR 67637 - Equity and Excellence Commission

    2012-11-13

    ... notice also describes the functions of the Commission. Notice of this meeting is required by section 10(a.... ADDRESSES: The Commission will meet in Washington, DC at the National Museum of the American Indian at... Lounge of the museum on November 27 and in the museum's fourth-floor conference room on November 28. FOR...

  3. Commissioning quality assurance at Pickering NGS

    Wieckowski, J.T.

    1983-05-01

    Ontario Hydro decided in 1978 to implement a formal quality assurance program applicable to commissioning and operation of nuclear generating stations. Pickering NGS is the first station to have the commissioning quality assurance (CQA) program applied to it. This paper outlines the scope, implementation, and evaluation of the CQA program as applied to Pickering Unit 5

  4. 76 FR 4369 - Special Law Enforcement Commissions

    2011-01-25

    ...This notice announces the online publication of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the Office of Justice Services following passage of the Tribal Law and Order Act of 2010. The documents are published on the Indian Affairs Web site.

  5. Ghana Atomic Energy Commission: Annual Report 2001

    NONE

    2002-07-01

    This report covers the activities and research progams of the Ghana Atomic Energy Commission for the year 2001. The research programs and associated publications have been grouped under the three main institutes of the Commission namely National Nuclear Research Institute, Radiation Protection Institute and Biotechnology and Nuclear Agricultre Research Institute.

  6. The Lancet Commission on Syria | IDRC - International ...

    The journal has adopted a series of global commissions that convene groups of experts for a limited time to produce thematic work aimed at improving human lives through scientific review and inquiry, and to encourage accountability for the problem under study. The Commission on Syria marks the first time a Southern ...

  7. Ghana Atomic Energy Commission: Annual Report 2001

    2002-01-01

    This report covers the activities and research progams of the Ghana Atomic Energy Commission for the year 2001. The research programs and associated publications have been grouped under the three main institutes of the Commission namely National Nuclear Research Institute, Radiation Protection Institute and Biotechnology and Nuclear Agricultre Research Institute

  8. Niger Delta Development Commission and Sustainable ...

    Niger Delta Development Commission and Sustainable Development of Niger Delta Region of Nigeria: The Case of Rivers State. Goddey Wilson. Abstract. The study is on Niger Delta Development Commission and sustainable development of Niger Delta region of Nigeria, the case of Rivers State. The main objective of the ...

  9. Commissioning MMS: Challenges and Lessons Learned

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  10. A Practical Guide for Commissioning Existing Buildings

    Haasl, T.

    1999-05-11

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  11. A Practical Guide for Commissioning Existing Buildings

    Haasl, T.; Sharp, T.

    1999-04-01

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  12. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    Tiziano Camporesi

    Pit commissioning activities The last 4 months have seen various major achievements in hardware commissioning, global data taking, readiness of the DPGs to deal with LHC data flows and alignment and calibration workflows. Since February, the global commissioning has been characterized on the one side by more and more of the final CMS detector becoming available for global readout and triggering and on the other side by consolidation of many of the central software infrastructure and of most of the services infrastructure. The reliability of services like cooling, power, gas has markedly improved with respect to what we observed in the second half of 2007.   Of particular note are the delivery of all low voltage power supplies, the commissioning of the final power distribution, the progressive commissioning ( still ongoing)  of the Detector Safety System and of the associated DCS early warning and alarm system. On the detector side, while already we are used to seeing all of HCAL being exe...

  13. Presence of selected chemicals of emerging concern in water and bottom sediment from the St. Louis River, St. Louis Bay, and Superior Bay, Minnesota and Wisconsin, 2010

    Christensen, Victoria G.; Lee, Kathy E.; Kieta, Kristen A.; Elliott, Sarah M.

    2012-01-01

    The St. Louis Bay of Lake Superior receives substantial urban runoff, wastewater treatment plant effluent, and industrial effluent. In 1987, the International Joint Commission designated the St. Louis Bay portion of the lower St. Louis River as one of the Great Lakes Areas of Concern. Concerns exist about the potential effects of chemicals of emerging concern on aquatic biota because many of these chemicals, including endocrine active chemicals, have been shown to affect the endocrine systems of fish. To determine the occurrence of chemicals of emerging concern in the St. Louis River, the St. Louis Bay, and Superior Bay, the U.S. Geological Survey in cooperation with the Minnesota Pollution Control Agency and the Wisconsin Department of Natural Resources collected water and bottom-sediment samples from 40 sites from August through October 2010. The objectives of this study were to (1) identify the extent to which chemicals of emerging concern, including pharmaceuticals, hormones, and other organic chemicals, occur in the St. Louis River, St. Louis Bay, and Superior Bay, and (2) identify the extent to which the chemicals may have accumulated in bottom sediment of the study area. Samples were analyzed for selected wastewater indicators, hormones, sterols, bisphenol A, and human-health pharmaceuticals. During this study, 33 of 89 chemicals of emerging concern were detected among all water samples collected and 56 of 104 chemicals of emerging concern were detected in bottom-sediment samples. The chemical N,N-diethyl-meta-toluamide (DEET) was the most commonly detected chemical in water samples and 2,6-dimethylnaphthalene was the most commonly detected chemical in bottom-sediment samples. In general, chemicals of emerging concern were detected at a higher frequency in bottom-sediment samples than in water samples. Estrone (a steroid hormone) and hexahydrohexamethyl cyclopentabensopyran (a synthetic fragrance) were the most commonly detected endocrine active chemicals in

  14. Bird surveys at McKinley Bay and Hutchison Bay, Northwest Territories, in 1991

    Cornish, B J; Dickson, D L; Dickson, H L

    1992-03-01

    McKinley Bay is a shallow protected bay along the eastern Beaufort Sea coast which provides an important habitat for diving ducks. Since 1979, the bay has been the site of a winter harbor and support base for oil and gas exploraton in the Beaufort Sea. Aerial surveys for bird abundance and distribution were conducted in August 1991 as a continuation of long-term monitoring of birds in McKinley Bay and Hutchison Bay, a nearby area used as a control. The main objectives of the 1991 surveys were to expand the set of baseline data on natural annual fluctuations in diving duck numbers, and to determine if numbers of diving ducks had changed since the initial 1981-85 surveys. On the day with the best survey conditions, the population of diving ducks at McKinley bay was estimated at ca 32,000, significantly more than 1981-85. At Hutchison Bay, there were an estimated 11,000 ducks. As in previous years, large numbers of diving ducks were observed off Atkinson Point at the northwest corner of McKinley Bay, at the south end of the bay, and in the northeast corner near a long spit. Most divers in Hutchison Bay were at the west side. Diving ducks, primarily Oldsquaw and scoter, were the most abundant bird group in the study area. Observed distribution patterns of birds are discussed with reference to habitat preferences. 16 refs., 7 figs., 30 tabs.

  15. Evaluation of nuclear facility decommissioning projects. Status report. Humboldt Bay Power Plant Unit 3, SAFSTOR decommissioning

    Baumann, B.L.; Haffner, D.R.; Miller, R.L.; Scotti, K.S.

    1986-06-01

    This document explains the purpose of the US Nuclear Regulatory Commission's (NRC) Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program and summarizes information concerning the decommissioning of the Humboldt Bay Power Plant (HBPP) Unit 3 facility. Preparations to put this facility into a custodial safe storage (SAFSTOR) mode are currently scheduled for completion by June 30, 1986. This report gives the status of activities as of June 1985. A final summary report will be issued after completion of this SAFSTOR decommissioning activity. Information included in this status report has been collected from the facility decommissioning plan, environmental report, and other sources made available by the licensee. This data has been placed in a computerized data base system which permits data manipulation and summarization. A description of the computer reports that can be generated by the decommissioning data system (DDS) for Humboldt Bay and samples of those reports are included in this document

  16. Instrumented home energy rating and commissioning

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  17. The Kemeny commission report. Comments by UKAEA

    1979-01-01

    The report of the President's Commission - the Kemeny Report - on the accident at Three Mile island has been considered by the UKAEA and the implications of the Commission's findings and recommendations for the United Kingdom examined. The contents of the report have been studied not only generally but also for each site and especially with respect to plant instrumentation, operator training, emergency arrangements and communications. The Authority believes that there are no major deficiencies but is fully aware of the crucial importance of continuing to exercise all possible care and ensuring that each detailed point arising from the Kemeny Commission's Report is given careful thought. (U.K.)

  18. Commissioning quality assurance for nuclear power plants

    NONE

    1986-09-01

    This standard contains the requirements for the quality assurance program applicable to the commissioning phase of a nuclear power plant. This standard embodies the relevant quality assurance requirements of CSA Standard CAN3-N286.0, and is the governing Standard for commissioning quality assurance activities in the event of any conflicting requirements. This Standard applies to the commissioning of safety-related equipment, systems, and structures as identified by the owner. It may be applied to other equipment, systems, and structures at the discretion of the owner. 1 fig.

  19. Commissioning quality assurance for nuclear power plants

    1986-09-01

    This standard contains the requirements for the quality assurance program applicable to the commissioning phase of a nuclear power plant. This standard embodies the relevant quality assurance requirements of CSA Standard CAN3-N286.0, and is the governing Standard for commissioning quality assurance activities in the event of any conflicting requirements. This Standard applies to the commissioning of safety-related equipment, systems, and structures as identified by the owner. It may be applied to other equipment, systems, and structures at the discretion of the owner. 1 fig

  20. Official communication of the Safety Commission

    DG Unit

    2009-01-01

    The Prevention and Training section of the Safety Commission, would like to inform you that the new Safety Awareness course for newcomers will replace the welcome video in building 55 as of 2 April. The 3 levels (‘Safety at CERN’, ‘General Risks’ and ‘Specific Risks’) followed by 3 tests will determine access to CERN. Thanks to the SIR (Safety Information Registration, http://sir.cern.ch) application, it will be possible for you to follow the awareness course from your computer. For more information, go to the Safety Commission web site: http://safety-commission.web.cern.ch

  1. Official communication of the Safety Commission

    DG Unit

    2009-01-01

    We, the Prevention and Training section of the Safety Commission, would like to inform you that the new Safety Awareness course for newcomers will replace the welcome video in building 55 as of the 2nd April. The 3 levels (‘Safety at CERN’, ‘General Risks’ and ‘Specific Risks’) followed by 3 tests will determine access to CERN. Thanks to the SIR (Safety Information Registration, http://sir.cern.ch) application, it will be possible for you to follow the awareness course from your computer. For more information, go to the Safety Commission web site: http://safety-commission.web.cern.ch

  2. Nuclear Regulatory Commission: more aggressive leadership needed

    Staats, E.B.

    1980-01-01

    The Energy Reorganization Act of 1974 which established the Nuclear Regulatory Commission required GAO to evaluate the Commission's performance by January 18, 1980. This report responds to that requirement. GAO concluded that, although improvements have been made, the Commission's nuclear regulatory performance can be characterized best as slow, indecisive, cautious - in a word, complacent. This has largely resulted from a lack of aggressive leadership as evidenced by the Commissioners' failure to establish regulatory goals, control policymaking, and most importantly, clearly define their roles in nuclear regulation

  3. Permanent Commission for Health and Safety

    Association du personnel

    2007-01-01

    The mandate of the Staff Association's permanent commission for Health and Safety is to examine all aspects of health and safety related to the working environment at CERN. In no way does it wish to be a substitute for the official bodies that are responsible for these matters. The Commission's aim is to formulate remarks on and make proposals about these questions to the relevant bodies and the CERN Management. Its main focus is the safety of the CERN staff but it is also concerned with the safety of the installations and of the CERN environment. The Commission reports to the Staff Council and the Executive Committee of the Staff Association.

  4. Holy grail at Baglan Bay

    Watson, Jim

    1999-01-01

    The UK government's consent for the construction of a gas-fired power plant at Baglan Bay in South Wales is reported, and the growing popularity of economic combined-cycle gas turbine (CCGT) power plants and the resulting environmental improvements are noted . The combining of gas and steam turbines, design developments, and the UK moratorium on planning consents for gas fired power plants are discussed. General Electric's H System technology which will lower the amount of energy lost in the conversion of natural gas to electricity is described, and details of the ten most problematic CCGTs in the UK are given. The domination of the CCGT global market by four manufacturers, and the pressure on manufacturers to develop their designs are considered. (UK)

  5. 78 FR 62293 - Safety Zone, Oyster Festival 30th Anniversary Fireworks Display, Oyster Bay; Oyster Bay, NY

    2013-10-15

    ... Safety Zone, Oyster Festival 30th Anniversary Fireworks Display, Oyster Bay; Oyster Bay, NY AGENCY: Coast... zone on the navigable waters of Oyster Bay near Oyster Bay, NY for the Oyster Festival 30th Anniversary... Oyster Festival 30th Anniversary Fireworks Display is scheduled for October 19, 2013 and is one of...

  6. 78 FR 27126 - East Bay, St. Andrews Bay and the Gulf of Mexico at Tyndall Air Force Base, Florida; Restricted...

    2013-05-09

    ... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers 33 CFR Part 334 East Bay, St. Andrews Bay and the Gulf of Mexico at Tyndall Air Force Base, Florida; Restricted Areas AGENCY: U.S. Army... read as follows: Sec. 334.665 East Bay, St. Andrews Bay and the Gulf of Mexico, Restricted Areas...

  7. Support for EU fundraising in the field of Environment & Energy - BayFOR

    Ammerl, Thomas; Baumann, Cornelia; Reiter, Andrea; Blume, Andreas; Just, Jana; Franke, Jan

    2013-04-01

    Contract negotiations with the European Commission e) Project implementation (Project management, dissemination, Science-Policy-Interface) BayFOR staff has profound R&D background, as well as knowledge and experience in disseminating project outcomes, in particular with regard to the adaptation of results to the needs of relevant target groups like science, industry/SMEs, policy makers and the public. Furthermore, BayFOR can draw on distinct experience in the management of European research projects (e.g. CLIMB, Largecells, AlpBC, GeoMol, WE-EEN, WINALP). As a partner in the network for SMEs "Enterprise Europe Network" (EEN), BayFOR offers advice and support on topics such as funding, research programs, public procurement, market penetration and the promotion of innovation at European level. Beyond, BayFOR will make use of its regional networks to promote uptake and exploitation of project results. BayFOR is also commissioned by Bavaria's State Ministry of Science, Research and the Arts to look after the Bavarian University Funding Programme for the Initiation of International Projects (BayIntAn). Our efforts are aimed at initiating or strengthening transnational collaborative research involving Bavarian universities and universities of applied sciences.

  8. Nuclear Regulatory Commission issuances, January 1992

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Defense (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances, May 1992

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Impact of National Universities Commission (NUC) Accreditation ...

    Nekky Umera

    (NUC) accreditation exercise on university administrative structure of four selected Nigerian ... The Commission's recommendations led to the setting up by Government the National ... For instance, the goals of tertiary education as spelt out in ...

  11. Commissioning (Phases 4, 4A, 4B)

    Schofield, Andrew

    1997-01-01

    Phase 4 marked the completion of ANS&A's commitments under the BAA, as the new large centrifuge at the Waterways Experiment Station was commissioned and a series of research experiments were undertaken to demonstrate the breadth of new...

  12. Compressor Load Stand: Commissioning and Control Strategies

    Causey, Andrew

    1998-01-01

    .... The purpose of this research project was to commission this load stand, which includes setting up the hardware, setting up a control system, a data acquisition system, and an automatic test sequence system...

  13. The commissioning of nuclear power plants

    1989-09-01

    The objectives and requirements to be met in commissioning nuclear power plants are presented. The objective of commissioning is to ensure that each component, subsystem, system, or structure in a plant will be capable of fulfilling its design requirements throughout its design life. The requirements for commissioning are: the preparation of a detailed, comprehensive, documented program to demonstrate that all components, systems and structures relevant to safety meet design intent; documented evidence that safety systems are fully operable and can meet design requirements; and, appropriate documentation of the actual state or behaviour of all components, systems and structures relevant to safety. All systems must be included in the commissioning program. Whenever possible, full safety system test should be performed. If a full system in situ test is not possible, alternative means are suggested. (8 refs.)

  14. Nuclear Regulatory Commission issuances, July 1992

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances, June 1992

    1992-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances, April 1994

    1994-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission Issuances, November 1980

    1980-11-01

    Contents: Issuances of the Nuclear Regulatory Commission; Issuances of the Atomic Safety and Licensing Appeal Boards; Issuances of the Atomic Safety and Licensing Boards; and Issuances of the Directors Denial

  18. Nuclear Regulatory Commission issuances, December 1991

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances, December 1993

    1993-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances, December 1992

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances, September 1992

    1992-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances, February 1992

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances, March 1993

    1993-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances, July 1993

    1993-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances, August 1992

    1992-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. arXiv Medical Physics Commissioning

    Meer, David

    The medical commissioning is an important step to bring a particle gantry into clinical operation for tumour treatments. This involves the parametrization and characterization of all relevant systems including the beam delivery, the patient table, the imaging systems and the connection to all required software components. This article is limited to necessary tasks for the beam delivery system of a pencil beam scanning system. Usually the commissioning starts with the characterization of the unscanned beam and the calibration of the beam energy. The following steps are the parametrization of the scanning system, the commissioning of the beam position monitoring system and characterization of the spot size, all requiring precisions better than 1 mm. The commissioning effort for these tasks depends also on the gantry topology. Finally, the calibration of the dose measurement system ensures that any dose distribution can be delivered with an absolute precision better than 1%.

  7. Nuclear Regulatory Commission issuances, May 1982

    1982-01-01

    This report includes the issuances received during the specified period from the Commission, the Atomic Safety and Licensing Appeal Boards, the Atomic Safety and Licensing Boards, the Administrative Law Judge, the Directors' Decision, and the Denials of Petitions for Rulemaking

  8. Commissioning the Linac Coherent Light Source injector

    R. Akre

    2008-03-01

    Full Text Available The Linac Coherent Light Source is a SASE x-ray free-electron laser (FEL project presently under construction at SLAC [J. Arthur et al., SLAC-R-593, 2002.]. The injector section, from drive laser and rf photocathode gun through first bunch compressor chicane, was installed in the fall of 2006. The initial system commissioning with an electron beam was completed in August of 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photocathode drive laser, rf gun, photocathode, S-band and X-band rf systems, first bunch compressor, and the various beam diagnostics.

  9. Nuclear Regulatory Commission Issuances, December 1980

    1980-12-01

    Contents: Issuances of the Nuclear Regulatory Commission; Issuances of the Atomic Safety and Licensing Appeal Boards; Issuances of the Atomic Safety and Licensing Boards; and Issuances of the Directors Denial

  10. Nuclear Regulatory Commission issuances, August 1991

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Alaska State Commission for Human Rights

    Harassment Poster Filing a Complaint with the Commission Public Hearing Cases Accusations Decisions Public . vs. Anchorage Plumbing and Heating Vilma Anderson vs. Anchorage School District Robin Block vs. Pulse

  12. LHC injection optics measurements at commissioning (2015)

    Garcia-Tabares Valdivieso, Ana; Coello De Portugal - Martinez Vazquez, Jaime Maria; Garcia-Bonilla, Alba-Carolina; Langner, Andy Sven; Maclean, Ewen Hamish; Malina, Lukas; Mcateer, Meghan Jill; Persson, Tobias Hakan Bjorn; Skowronski, Piotr Krzysztof; Tomas Garcia, Rogelio; CERN. Geneva. ATS Department

    2016-01-01

    This report describes the measurement and correction process followed during the 2015 LHC injection optics commissioning which extended into Machine Developments (MDs). Results have been analyzed and compared to the 2012 measurements.

  13. Nuclear Regulatory Commission issuances, February 1993

    1993-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances, November 1992

    1992-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances, April 1993

    1993-04-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Online Learning of Commission Avoidant Portfolio Ensembles

    Uziel, Guy; El-Yaniv, Ran

    2016-01-01

    We present a novel online ensemble learning strategy for portfolio selection. The new strategy controls and exploits any set of commission-oblivious portfolio selection algorithms. The strategy handles transaction costs using a novel commission avoidance mechanism. We prove a logarithmic regret bound for our strategy with respect to optimal mixtures of the base algorithms. Numerical examples validate the viability of our method and show significant improvement over the state-of-the-art.

  17. The LHC from commissioning to operation

    Lamont, M

    2011-01-01

    In 2011 the LHC moved from commissioning into the physics production phase with the aim of accumulating 1 fb-1 by the end of the year. The progress from commissioning to operation is described. Emphasis is put on the beam performance, but also on the performance of the different hardware systems. The role of collimation and machine protection is discussed, in view of the very high stored beam and magnet energy.

  18. Description of gravity cores from San Pablo Bay and Carquinez Strait, San Francisco Bay, California

    Woodrow, Donald L.; John L. Chin,; Wong, Florence L.; Fregoso, Theresa A.; Jaffe, Bruce E.

    2017-06-27

    Seventy-two gravity cores were collected by the U.S. Geological Survey in 1990, 1991, and 2000 from San Pablo Bay and Carquinez Strait, California. The gravity cores collected within San Pablo Bay contain bioturbated laminated silts and sandy clays, whole and broken bivalve shells (mostly mussels), fossil tube structures, and fine-grained plant or wood fragments. Gravity cores from the channel wall of Carquinez Strait east of San Pablo Bay consist of sand and clay layers, whole and broken bivalve shells (less than in San Pablo Bay), trace fossil tubes, and minute fragments of plant material.

  19. Alberta Petroleum Marketing Commission annual report, 1993

    1994-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1993 marked the last full year of the Commission operating as Alberta's representative in the energy regulatory arena in Canada and the USA; due to restructuring, these functions will be transferred to the Ministry of Energy in early 1994. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 40.2 million bbl, down 11% from 1992, and receipts of heavy crude were 3.7 million bbl, down 42% from 1992. Revenue from crude oil sales was $800 million, down 25% from 1992. The Commission's natural gas activities in 1993 included price determination and information collection. 4 figs., 3 tabs

  20. Delaware River and Upper Bay Sediment Data

    National Oceanic and Atmospheric Administration, Department of Commerce — The area of coverage consists of 192 square miles of benthic habitat mapped from 2005 to 2007 in the Delaware River and Upper Delaware Bay. The bottom sediment map...

  1. Willapa Bay, Washington Benthic Habitats 1995 Biotic

    National Oceanic and Atmospheric Administration, Department of Commerce — In June 1995, the Columbia River Estuary Study Taskforce (CREST) acquired 295 true color aerial photographs (1:12,000) of Willapa Bay, Washington, from the State of...

  2. Willapa Bay, Washington Benthic Habitats 1995 Geoform

    National Oceanic and Atmospheric Administration, Department of Commerce — In June 1995, the Columbia River Estuary Study Taskforce (CREST) acquired 295 true color aerial photographs (1:12,000) of Willapa Bay, Washington, from the State of...

  3. San Antonio Bay 1986-1989

    National Oceanic and Atmospheric Administration, Department of Commerce — The effect of salinity on utilization of shallow-water nursery habitats by aquatic fauna was assessed in San Antonio Bay, Texas. Overall, 272 samples were collected...

  4. Corpus ChristiEast Matagorda Bay 1986

    National Oceanic and Atmospheric Administration, Department of Commerce — Patterns of habitat utilization were compared among transplanted and natural Spartina alterniflora marshes in the Halls Lake area of Chocolate Bay in the Galveston...

  5. San Francisco Bay Interferometric Bathymetry: Area B

    National Oceanic and Atmospheric Administration, Department of Commerce — High resolution sonar data were collected over ultra-shallow areas of the San Francisco Bay estuary system. Bathymetric and acoustic backscatter data were collected...

  6. BENTHIC MACROFAUNAL ALIENS IN WILLAPA BAY

    Benthic macrofaunal samples were collected at random stations in Willapa Bay, WA, in four habitats [eelgrass (Zostera marina), Atlantic cordgrass (Spartina alterniflora), mud shrimp (Upogebia pugettensis), ghost shrimp (Neotrypaea californiensis)] in 1996 and in seven habitats (Z...

  7. FL BAY SPECTROUT-POPULATION STATUS

    National Oceanic and Atmospheric Administration, Department of Commerce — Juvenile spotted seatrout and other sportfish are being monitored annually over a 6-mo period in Florida Bay to assess their abundance over time relative to...

  8. Willapa Bay, Washington Benthic Habitats 1995 Substrate

    National Oceanic and Atmospheric Administration, Department of Commerce — In June 1995, the Columbia River Estuary Study Taskforce (CREST) acquired 295 true color aerial photographs (1:12,000) of Willapa Bay, Washington, from the State of...

  9. Benthic harpacticoid copepods of Jiaozhou Bay, Qingdao

    Ma, Lin; Li, Xinzheng

    2017-09-01

    The species richness of benthic harpacticoid copepod fauna in Jiaozhou Bay, Qingdao, on the southern coast of Shandong Peninsula, has not been comprehensively studied. We present a preliminary inventory of species for this region based on material found in nine sediment samples collected from 2011 to 2012. Our list includes 15 species belonging to 15 genera in 9 families, the most speciose family was the Miraciidae Dana, 1846 (seven species); all other families were represented by single species only. Sediment characteristics and depth are determined to be important environmental determinants of harpacticoid distribution in this region. We briefly detail the known distributions of species and provide a key to facilitate their identification. Both harpacticoid species richness and the species/genus ratio in Jiaozhou Bay are lower than in Bohai Gulf and Gwangyang Bay. The poor knowledge of the distribution of benthic harpacticoids, in addition to low sampling effort in Jiaozhou Bay, likely contribute to low species richness.

  10. Biscayne Bay Florida Bottlenose Dolphin Studies

    National Oceanic and Atmospheric Administration, Department of Commerce — These data sets include a compilation of small vessel based studies of bottlenose dolphins that reside within Biscayne Bay, Florida, adjacent estuaries and nearshore...

  11. A Glance at Bohai Bay Oil Province

    Gao Shoubai

    1995-01-01

    @@ Chinese oil industry keeps on developing in 1994. The oil production of Bohai Bay Oil Province located in East China also keeps on growing. Geologically,the total area of Bohai Bay Basin is about 200 000 km2 and the main structural units are: Liaohe Depression, Huanghua Depression,Jizhong Depression, Linqing Depression, Jiyang Depression, Changwei Depression, Bozhong Depression,Chengning Uplift and Cangjing Uplift (see figure 1). Area of the main structural units is listed in following:

  12. Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant

    NONE

    1995-04-07

    The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriate audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.

  13. 75 FR 81244 - Military Leadership Diversity Commission Meeting

    2010-12-27

    ... DEPARTMENT OF DEFENSE Office of the Secretary Military Leadership Diversity Commission Meeting... will take place: 1. Name of Committee: Military Leadership Diversity Commission (MLDC). 2. Date... Military Leadership Diversity Commission to continue their efforts to address congressional concerns as...

  14. 75 FR 2114 - Military Leadership Diversity Commission (MLDC); Meeting

    2010-01-14

    ... DEPARTMENT OF DEFENSE Office of the Secretary Military Leadership Diversity Commission (MLDC....150, the Department of Defense announces that the Military Leadership Diversity Commission (MLDC) will... commissioners of the Military Leadership Diversity Commission to continue their efforts to address congressional...

  15. Toxic phytoplankton in San Francisco Bay

    Rodgers, Kristine M.; Garrison, David L.; Cloern, James E.

    1996-01-01

    The Regional Monitoring Program (RMP) was conceived and designed to document the changing distribution and effects of trace substances in San Francisco Bay, with focus on toxic contaminants that have become enriched by human inputs. However, coastal ecosystems like San Francisco Bay also have potential sources of naturally-produced toxic substances that can disrupt food webs and, under extreme circumstances, become threats to public health. The most prevalent source of natural toxins is from blooms of algal species that can synthesize metabolites that are toxic to invertebrates or vertebrates. Although San Francisco Bay is nutrient-rich, it has so far apparently been immune from the epidemic of harmful algal blooms in the world’s nutrient-enriched coastal waters. This absence of acute harmful blooms does not imply that San Francisco Bay has unique features that preclude toxic blooms. No sampling program has been implemented to document the occurrence of toxin-producing algae in San Francisco Bay, so it is difficult to judge the likelihood of such events in the future. This issue is directly relevant to the goals of RMP because harmful species of phytoplankton have the potential to disrupt ecosystem processes that support animal populations, cause severe illness or death in humans, and confound the outcomes of toxicity bioassays such as those included in the RMP. Our purpose here is to utilize existing data on the phytoplankton community of San Francisco Bay to provide a provisional statement about the occurrence, distribution, and potential threats of harmful algae in this Estuary.

  16. Commissioning of the LHC Cryogenic System Subsystems Cold Commissioning in Preparation of Full Sector Tests

    Serio, L; Ferlin, G; Gilbert, N; Gruehagen, Henning; Knoops, S; Parente, C; Sanmartí, M

    2006-01-01

    The cryogenic system for the Large Hadron Collider accelerator is presently in its final phase of installation and commissioning at nominal operating temperatures. The refrigeration capacity for the LHC will be produced using eight large cryogenic plants installed on five technical sites and distributed around the 26.7-km circumference ring located in a deep underground tunnel. The status of the cryogenic system commissioning is presented together with the experience gained in operating and commissioning it.

  17. Gradient Analysis and Classification of Carolina Bay Vegetation: A Framework for Bay Wetlands Conservation and Restoration

    Diane De Steven,Ph.D.; Maureen Tone,PhD.

    1997-10-01

    This report address four project objectives: (1) Gradient model of Carolina bay vegetation on the SRS--The authors use ordination analyses to identify environmental and landscape factors that are correlated with vegetation composition. Significant factors can provide a framework for site-based conservation of existing diversity, and they may also be useful site predictors for potential vegetation in bay restorations. (2) Regional analysis of Carolina bay vegetation diversity--They expand the ordination analyses to assess the degree to which SRS bays encompass the range of vegetation diversity found in the regional landscape of South Carolina's western Upper Coastal Plain. Such comparisons can indicate floristic status relative to regional potentials and identify missing species or community elements that might be re-introduced or restored. (3) Classification of vegetation communities in Upper Coastal Plain bays--They use cluster analysis to identify plant community-types at the regional scale, and explore how this classification may be functional with respect to significant environmental and landscape factors. An environmentally-based classification at the whole-bay level can provide a system of templates for managing bays as individual units and for restoring bays to desired plant communities. (4) Qualitative model for bay vegetation dynamics--They analyze present-day vegetation in relation to historic land uses and disturbances. The distinctive history of SRS bays provides the possibility of assessing pathways of post-disturbance succession. They attempt to develop a coarse-scale model of vegetation shifts in response to changing site factors; such qualitative models can provide a basis for suggesting management interventions that may be needed to maintain desired vegetation in protected or restored bays.

  18. Ocean acidification buffering effects of seagrass in Tampa Bay

    Yates, Kimberly K.; Moyer, Ryan P.; Moore, Christopher; Tomasko, David A.; Smiley, Nathan A.; Torres-Garcia, Legna; Powell, Christina E.; Chappel, Amanda R.; Bociu, Ioana; Smiley, Nathan; Torres-Garcia, Legna M.; Powell, Christina E.; Chappel, Amanda R.; Bociu, Ioana

    2016-01-01

    The Intergovernmental Panel on Climate Change has identified ocean acidification as a critical threat to marine and estuarine species in ocean and coastal ecosystems around the world. However, seagrasses are projected to benefit from elevated atmospheric pCO2, are capable of increasing seawater pH and carbonate mineral saturation states through photosynthesis, and may help buffer against the chemical impacts of ocean acidification. Additionally, dissolution of carbonate sediments may also provide a mechanism for buffering seawater pH. Long-term water quality monitoring data from the Environmental Protection Commission of Hillsborough County indicates that seawater pH has risen since the 1980‘s as seagrass beds have continued to recover since that time. We examined the role of seagrass beds in maintaining and elevating pH and carbonate mineral saturation state in northern and southern Tampa Bay where the percent of carbonate sediments is low (40%), respectively. Basic water quality and carbonate system parameters (including pH, total alkalinity, dissolved inorganic carbon, partial pressure of CO2, and carbonate mineral saturation state) were measured over diurnal time periods along transects (50-100 m) including dense and sparse Thalassia testudinum. seagrass beds, deep edge seagrass, and adjacent bare sand bottom. Seagrass density and productivity, sediment composition and hydrodynamic parameters were also measured, concurrently. Results indicate that seagrass beds locally elevate pH by up to 0.5 pH unit and double carbonate mineral saturation states relative to bare sand habitats. Thus, seagrass beds in Tampa Bay may provide refuge for marine organisms from the impacts of ocean acidification.

  19. BOOK REVIEW OF "CHESAPEAKE BAY BLUES: SCIENCE, POLITICS, AND THE STRUGGLE TO SAVE THE BAY"

    This is a book review of "Chesapeake Bay Blues: Science, Politics, and the Struggle to Save the Bay". This book is very well written and provides an easily understandable description of the political challenges faced by those proposing new or more stringent environmental regulat...

  20. 77 FR 21890 - Drawbridge Operation Regulation; Sturgeon Bay Ship Canal, Sturgeon Bay, WI

    2012-04-12

    ... Street and Maple-Oregon Bridges so vehicular traffic congestion would not develop on downtown Sturgeon... the efficient movement of vehicular traffic in Sturgeon Bay. The Sturgeon Bay Ship Canal is... experiences a significant increase in vehicular and vessel traffic during the peak tourist and navigation...

  1. 76 FR 28309 - Drawbridge Operation Regulation; Sturgeon Bay Ship Canal, Sturgeon Bay, WI

    2011-05-17

    ... vehicular traffic congestion would not develop on downtown Sturgeon Bay streets due to unscheduled bridge... schedules during the peak tourist and navigation seasons to provide for the efficient movement of vehicular... between Lake Michigan and Green Bay. The area experiences a significant increase in vehicular and vessel...

  2. Dalgety Bay: Managing the risks from historic radioactive contamination

    Dale, P. [Scottish Environment Protection Agency (United Kingdom)

    2014-07-01

    Discrete radioactive items have been detected on a public beach at Dalgety Bay, Fife near Edinburgh, Scotland since 1990. Dalgety Bay is a New town built on the site of a former military airfield which serviced and decommissioned planes between 1917 and 1959. In 2011, monitoring of the affected foreshore reported hundreds of radium sources on the beach with activities up to 76 MBq. Immediate actions included closure of part of the beach, additional signs and an intensification of the monitoring and recovery programme. In order to determine the potential source and magnitude of the problem a programme of investigation was commissioned by both SEPA and the UK's Ministry of Defence MoD. The investigation programme revealed that the coastline at parts of the bay was made largely of ash and clinker the result of burning of wastes at the time the air base was operational. The depth of these deposits is variable but at times can be metres thick and extent several metres inland. This made ground contained radium sources which were being exposed on the foreshore as marine action eroded the coastline. Current monitoring and recovery programmes continue to recover over 100 sources each month from the beach which is around 800 m long in entirety. The potential health consequences of encountering such a source ranged according to the potential exposure scenario. For walkers passing through the area the external doses are practically zero, however if people remove material either inadvertently or deliberately doses from skin contact can be significant. For the skin doses initial estimates of doses have indicated that the dose rates were around 1 Gray per hour per MBq (to 1 cm{sup 2} ) to the 70 micron skin thickness recommended by ICRP[1] (ICRP, 89). For ingestion doses can be in excess of 100 mSv. The major variables defining the committed effective dose are the initial activity and the diverse range in solubility which is from zero to 36%. The potential doses to date give

  3. Alberta Petroleum Marketing Commission annual report, 1992

    1993-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketeer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1992 marked the end of chronically depressed natural gas prices and a significant reduction in natural gas surpluses. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 45.3 million bbl, unchanged from 1991, and receipts of heavy crude were 6.3 million bbl, up 4% from 1991. Revenue from crude oil sales was $1.1 billion, down from $1.64 billion in 1991. The Commission's natural gas activities in 1992 included price determination and information collection. 9 figs., 1 tab

  4. Alberta Petroleum Marketing Commission annual report, 1991

    1992-04-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketeer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. In 1991, the middle east crisis caused prices to spike at the commencement of the Gulf war, but these quickly stabilized. The Commission's receipts of light and medium royalty oil totalled 45.3 million bbl, down 1.5% from 1990, and receipts of heavy crude were 6.1 million bbl, up 5% from 1990. Revenue from crude oil sales was $1,642,244,000, down from $2,078,197,000 in 1990. Loss of the Montreal market through pipeline closure led to increased pressure on prices, particularly on heavy crudes. The Commission's natural gas activities in 1991 included price determination and information collection. 9 figs., 1 tab

  5. The NRU blowdown test facility commissioning program

    Walsworth, J A; Zanatta, R J; Yamazaki, A R; Semeniuk, D D; Wong, W; Dickson, L W; Ferris, C E; Burton, D H [Atomic Energy of Canada Ltd., Chalk River, ON (Canada). Chalk River Nuclear Labs.

    1990-12-31

    A major experimental program has been established at the Chalk River Nuclear Laboratories (CRL) that will provide essential data on the thermal and mechanical behaviour of nuclear fuel under abnormal reactor operating conditions and on the transient release, transport and deposition of fission product activity from severely degraded fuel. A number of severe fuel damage (SFD) experiments will be conducted within the Blowdown Test Facility (BTF) at CRL. A series of experiments are being conducted to commission this new facility prior to the SFD program. This paper describes the features and the commissioning program for the BTF. A development and testing program is described for critical components used on the reactor test section. In-reactor commissioning with a fuel assembly simulator commenced in 1989 June and preliminary results are given. The paper also outlines plans for future all-effects, in-reactor tests of CANDU-designed fuel. (author). 11 refs., 3 tabs., 7 figs.

  6. VINCI: the VLT Interferometer commissioning instrument

    Kervella, Pierre; Coudé du Foresto, Vincent; Glindemann, Andreas; Hofmann, Reiner

    2000-07-01

    The Very Large Telescope Interferometer (VLTI) is a complex system, made of a large number of separated elements. To prepare an early successful operation, it will require a period of extensive testing and verification to ensure that the many devices involved work properly together, and can produce meaningful data. This paper describes the concept chosen for the VLTI commissioning instrument, LEONARDO da VINCI, and details its functionalities. It is a fiber based two-way beam combiner, associated with an artificial star and an alignment verification unit. The technical commissioning of the VLTI is foreseen as a stepwise process: fringes will first be obtained with the commissioning instrument in an autonomous mode (no other parts of the VLTI involved); then the VLTI telescopes and optical trains will be tested in autocollimation; finally fringes will be observed on the sky.

  7. Commissioning of the Ground Test Accelerator RFQ

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H - injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2βγ Drift Tube Linac (DTL-1) module, the 8.7 MeV 2βγ DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations

  8. Commissioning of the ground test accelerator RFQ

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Garnott, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohsen, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Sandoval, D.P.; Saadatmand, K.; Stevens, R.R.Jr.; Vaughn, G.; Wadlinger, E.A.; Yuan, V.; Connolly, R.; Weiss, R.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on line. The commissioning stages are the 35-keV H - injector, the 2.5-MeV radio-frequency quadrupole (RFQ), the intertank matching section (IMS), the 3.2-MeV first 2-βλ drift tube linac (DTL-1) module, the 8.7-MeV 2-βλDTL (modules 1-5), and the 24-MeV GTA (all 10 DTL modules). Commissioning results from the RFQ beam experiments are presented along with comparisons with simulations. (Author) 8 refs., 9 figs

  9. Yale and the Atomic Bomb Casualty Commission

    Bowers, J.Z.

    1983-01-01

    This is a description, based largely on personal discussions, of the contributions of men from the Yale University School of Medicine to the saga of the immediate and long-term studies on the medical effects of the atomic bombs at Hiroshima and Nagasaki. They played key roles in the immediate studies of bomb effects, in the creation of long-term studies of delayed effects, and in elevating the Atomic Bomb Casualty Commission after 1955 to a position of excellence in its studies and relations with the Japanese. The accumulation of the information presented in this paper derives from research for the preparation of the history of the Atomic Bomb Casualty Commission. In 1975, the commission was passed to Japanese leadership as the Radiation Effects Research Foundation

  10. Law of the Energy Regulatory Commission

    1995-01-01

    This Decree-Law consist of three chapters each on divided in articles and subsections and came into force in November 1 st., 1995. Chapter I, with the heading 'Nature and Powers', defines the Energy Regulatory Commission as a decentralized organ of the Energy Secretariat with technical and operative autonomy in terms of the law, and establish the conditions for the sell, generation, exportation and importation of electricity with destination to particular and public services. The sell transport, storage and distribution of natural gas, as well as the gas liquefied from petroleum are also considered. Chapter II with the heading 'Organization and duties' establish that the Commission is integrated by five Committee, the President included. The Committee members will deliberate in collegiate manner and the decisions are by majority, having the President a vote of quality. Chapter III for 'General provisions' is related to the lawsuits arises between the Commission and the users of services. (Author)

  11. Physical processes in a coupled bay-estuary coastal system: Whitsand Bay and Plymouth Sound

    Uncles, R. J.; Stephens, J. A.; Harris, C.

    2015-09-01

    Whitsand Bay and Plymouth Sound are located in the southwest of England. The Bay and Sound are separated by the ∼2-3 km-wide Rame Peninsula and connected by ∼10-20 m-deep English Channel waters. Results are presented from measurements of waves and currents, drogue tracking, surveys of salinity, temperature and turbidity during stratified and unstratified conditions, and bed sediment surveys. 2D and 3D hydrodynamic models are used to explore the generation of tidally- and wind-driven residual currents, flow separation and the formation of the Rame eddy, and the coupling between the Bay and the Sound. Tidal currents flow around the Rame Peninsula from the Sound to the Bay between approximately 3 h before to 2 h after low water and form a transport path between them that conveys lower salinity, higher turbidity waters from the Sound to the Bay. These waters are then transported into the Bay as part of the Bay-mouth limb of the Rame eddy and subsequently conveyed to the near-shore, east-going limb and re-circulated back towards Rame Head. The Simpson-Hunter stratification parameter indicates that much of the Sound and Bay are likely to stratify thermally during summer months. Temperature stratification in both is pronounced during summer and is largely determined by coastal, deeper-water stratification offshore. Small tidal stresses in the Bay are unable to move bed sediment of the observed sizes. However, the Bay and Sound are subjected to large waves that are capable of driving a substantial bed-load sediment transport. Measurements show relatively low levels of turbidity, but these respond rapidly to, and have a strong correlation with, wave height.

  12. Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit

    NONE

    1997-02-14

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

  13. European commission research activities on iodine

    Loggia, E. della

    1996-01-01

    The research on iodine, as on other important fission products which would be released during a severe accident, carried out directly or organized by the European Commission stems from the Euratom Treaty, namely from Chapter III of the treaty which deals with the protection of the health of the population against radiations and from Chapter I which deals with research. In this paper we do not consider the Commission radiological protection programme: we limit ourselves to the presentation of the research carried out on Iodine as part of the most recent source term studies within the framework Programmes as are called the research programme of the European Commission, usually valid for a 4 year periods. The research activities are carried out by the European Commission either directly through the Joint Research Centres (JRC) or indirectly through collaboration with research organizations of Member States. Concerning the iodine research carried out as Direct Action in the Joint Research Centres, are mentioned here the most relevant activities carried out in this field at the JRC of Ispra and Karlsruhe (TUI). As Indirect Action, we present here the results of some studies allocated by the European Commission to experts of research organizations of Member Countries, followed by a short description of the main results achieved by the Reinforced Concerted Action, within the III Framework Programme (1992-1995). At the end of the paper are described the research on iodine being carried out or proposed within the IV Framework Programme (1995-1998). Mention is also done of the Commission participation, relevant in terms of financial and human efforts, to the PHEBUS FP Project. (author) refs

  14. European commission research activities on iodine

    Loggia, E della [European Commission, Brussels (Belgium)

    1996-12-01

    The research on iodine, as on other important fission products which would be released during a severe accident, carried out directly or organized by the European Commission stems from the Euratom Treaty, namely from Chapter III of the treaty which deals with the protection of the health of the population against radiations and from Chapter I which deals with research. In this paper we do not consider the Commission radiological protection programme: we limit ourselves to the presentation of the research carried out on Iodine as part of the most recent source term studies within the framework Programmes as are called the research programme of the European Commission, usually valid for a 4 year periods. The research activities are carried out by the European Commission either directly through the Joint Research Centres (JRC) or indirectly through collaboration with research organizations of Member States. Concerning the iodine research carried out as Direct Action in the Joint Research Centres, are mentioned here the most relevant activities carried out in this field at the JRC of Ispra and Karlsruhe (TUI). As Indirect Action, we present here the results of some studies allocated by the European Commission to experts of research organizations of Member Countries, followed by a short description of the main results achieved by the Reinforced Concerted Action, within the III Framework Programme (1992-1995). At the end of the paper are described the research on iodine being carried out or proposed within the IV Framework Programme (1995-1998). Mention is also done of the Commission participation, relevant in terms of financial and human efforts, to the PHEBUS FP Project. (author) refs.

  15. Commissioning of the ATLAS Liquid Argon Calorimeters

    Cooke, M; The ATLAS collaboration

    2009-01-01

    Since the first modules of the ATLAS LAr calorimeters were read out in situ in 2006, commissioning studies have been performed. These studies include the testing of the electronics calibration system, surveys for dead or problematic channels, investigations of the quality of the physics pulse shape prediction , and tests of energy and time reconstruction with cosmic or single beam induced signals. The results of these commissioning studies indicate the LAr calorimeters are prepared for LHC collisions and positioned to meet the physics objectives of the ATLAS experiment.

  16. 1992 Nuclear Regulatory Commission Annual Report

    1993-01-01

    This is the 18th annual report of the US Nuclear Regulatory Commission (NRC), covering events and activities occurring in fiscal year 1992 (the year ending September 30, 1992), with some treatment of events from the last quarter of calendar year 1992. The NRC was created by enactment in the Congress of the Energy Reorganization Act of 1974. It is an independent agency of the Federal Government. The five NRC Commissioners are nominated by the President and confirmed by the United States Senate. The Chairman of the Commission is appointed by the President from among the Commissioners confirmed

  17. Jacques Delors - President de la Commission Europeenne

    Dacian Graţian GAL

    2005-02-01

    Full Text Available This article refers to the President of the European Commission between 1985- 1995, Jacques Delors. He was the single person who exercised the presidency of the European Commission during 10 years and this period was one of the most important for the European construction: the achievement of the Single Market, the development of the Single Currency Unit project, of the new common politics, the enlargement of the European Union from 12 members to 15 members etc. Due the contribution of his presidency to the European construction, Jacques Delors is one of the parents of the European construction and one of the most important political men of the XX century.  

  18. Concentration of PSP (Paralytic Shellfish Poisoning) Toxin On Shellfish From Inner Ambon Bay and Kao Bay North Halmahera

    Pello, F. S.; Haumahu, S.; Huliselan, N. V.; Tuapattinaja, M. A.

    2017-10-01

    The Inner Ambon Bay and Kao Bay have potential on fisheries resources which one of them is molluscs. Molluscs especially for class bivalve have economical values and are consumed by coastal community. The research had been done to analyze saxitoxin (STX) concentration on bivalves from Kao Bay and Inner Ambon Bay. The Saxitoxin Elisa Test Kit Protocol was used to determine saxitoxin concentration. The measurement showed that the highest concentration of saxitoxin (392.42 µg STXeq/100g shellfish meat) was Gafrarium tumidum from Ambon Bay, whereas concentration of saxitoxin (321.83 µg STXeq/100g shellfish meat) was Mactra mera from Kao Bay

  19. Bay of Fundy tidal energy : a response to the strategic environmental assessment

    2008-06-01

    Tidal in-stream energy conversion is an emerging technology to harness sea power. These energy conversion devices are similar to underwater windmills. The government of Nova Scotia is interested in understanding the potential effects of these devices on the Bay of Fundy. As a result, it commissioned a strategic environmental assessment (SEA) that was completed in the spring of 2008. This document presented a response to the SEA. It discussed Nova Scotia's specific approach to tidal energy as well as the province's broader approach to marine renewable energy in the Bay of Fundy, with specific responses to each recommendation in the SEA. The energy context was presented, with particular reference to energy strategy; emissions; legal requirements; production costs; and carbon costs. The report also discussed tidal lagoon technology as well as a demonstration facility called the Fundy Tidal Energy Centre. The objectives of the SEA were also described and recommendations were presented. Recommendations were grouped under several key themes such as sustainability principles; allowing the demonstration of tidal in-stream energy conversion (TISEC) technologies; marine renewable energy legislation; research program; Mi'kmaq ecological knowledge study; provincial standard for ecological data; Bay of Fundy socioeconomic background study; marine renewable energy demonstration program; siting demonstration projects; and environmental assessment of the demonstration facility. figs

  20. PEMANFATAN TEOREMA BAYES DALAM PENENTUAN PENYAKIT THT

    Sri Winiarti

    2008-07-01

    Full Text Available Dalam konsep pelacakan dalam mencari solusi dengan pendekatan artificial inteligent, ada berbagai metode yang dapat diterapkan untuk mengatasi masalah ketidakpastian saat proses pelacakan terjadi. Salah satunya adalah teorema bayes. Adanya ketidakpastian pada proses pelacakan dapat terjadi karena adanya perubahan pengetahuan yang ada di dalam sistem. Untuk itu diperlukan adanya suatu metode untuk mengatasi permasalahan tersebut. Dalam penelitian ini telah diterapkan suatu metode untuk mengatasi ketidakpastian dengan teorema Bayes pada kasus pelacakan untuk mendiagnosa penyakit pada THT (Telinga,Hidung dan Tenggorokan. Subjek pada penelitian ini adalah proses pelacakan untuk menentukan penyakit THT dengan model penalaran forward chaining dan metode kepastiannya menggunakan teorema bayes dengan cara menghitung nilai probabilitas suatu penyakit dan membandingkan probabilitas setiap gejalanya. Model pengembangan perangkat lunak yang digunakan dalam penelitian ini adalah Waterfall. Metode Waterfall diawali dengan analisis data, perancangan sistem, pengkodean menggunakan Visual Basic 6.0, pengujian sistem dengan black box test dan alfa test. Dari penelitian yang dilakukan menghasilkan sebuah perangkat lunak yaitu yang mampu menentukan penyakit pada THT dengan menerapkan metode bayes untuk mengatasi ketidakpastian. Hasil uji coba sistem menujukkan bahwa aplikasi ini layak dan dapat digunakan. Kata kunci : Penyakit, THT, Teorema Bayes.

  1. Changing Salinity Patterns in Biscayne Bay, Florida

    ,

    2004-01-01

    Biscayne Bay, Fla., is a 428-square-mile (1,109-square-kilometer) subtropical estuarine ecosystem that includes Biscayne National Park, the largest marine park in the U.S. national park system (fig. 1). The bay began forming between 5,000 and 3,000 years ago as sea level rose and southern Florida was flooded. Throughout most of its history, the pristine waters of the bay supported abundant and diverse fauna and flora, and the bay was a nursery for the adjacent coral-reef and marine ecosystems. In the 20th century, urbanization of the Miami-Dade County area profoundly affected the environment of the bay. Construction of powerplants, water-treatment plants, and solid-waste sites and large-scale development along the shoreline stressed the ecosystem. Biscayne National Monument was established in 1968 to ?preserve and protect for the education, inspiration, recreation and enjoyment of present and future generations a rare combination of terrestrial, marine, and amphibious life in a tropical setting of great natural beauty? (Public Law 90?606). The monument was enlarged in 1980 and designated a national park.

  2. 45 CFR 702.12 - Contempt of the Commission.

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Contempt of the Commission. 702.12 Section 702.12 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION ON CIVIL RIGHTS RULES ON HEARINGS, REPORTS, AND MEETINGS OF THE COMMISSION Hearings and Reports § 702.12 Contempt of the Commission...

  3. 29 CFR 2200.92 - Review by the Commission.

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION RULES OF PROCEDURE Posthearing Procedures § 2200.92 Review by the Commission. (a) Jurisdiction of the Commission; issues on... Commission to review the entire case. The issues to be decided on review are within the discretion of the...

  4. 19 CFR 213.5 - Access to Commission resources.

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Access to Commission resources. 213.5 Section 213.5 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in...

  5. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    2013-07-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0159] Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S... Policy. In SRM-SECY-12-0047, ``Revisions to the Nuclear Regulatory Commission Enforcement Policy,'' dated...

  6. 76 FR 31307 - Commission of Fine Arts; Notice of Meeting

    2011-05-31

    ... COMMISSION OF FINE ARTS Commission of Fine Arts; Notice of Meeting The next meeting of the U.S. Commission of Fine Arts is scheduled for June 16, 2011, at 10 a.m. in the Commission offices at the National Building Museum,Suite 312, Judiciary Square, 401 F Street, NW., Washington, DC, 20001-2728. Items of...

  7. 18 CFR 388.104 - Informal advice from Commission staff.

    2010-04-01

    ... Commission staff. 388.104 Section 388.104 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... Commission staff. (a) The Commission staff provides informal advice and assistance to the general public and... expressed by the staff do not represent the official views of the Commission, but are designed to aid the...

  8. 17 CFR 171.28 - Participation by Commission staff.

    2010-04-01

    ... staff. 171.28 Section 171.28 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION..., Membership Denial and Registration Actions § 171.28 Participation by Commission staff. The Division of.... The Commission shall by order establish a supplementary briefing schedule for the Commission staff and...

  9. Surface layer temperature inversion in the Bay of Bengal

    Pankajakshan, T.; Gopalakrishna, V.V.; Muraleedharan, P.M.; Reddy, G.V.; Araligidad, N.; Shenoy, Shrikant

    Surface layer temperature inversion occurring in the Bay of Bengal has been addressed. Hydrographic data archived in the Indian Oceanographic Data Center are used to understand various aspects of the temperature inversion of surface layer in the Bay...

  10. Parameter Identification by Bayes Decision and Neural Networks

    Kulczycki, P.; Schiøler, Henrik

    1994-01-01

    The problem of parameter identification by Bayes point estimation using neural networks is investigated.......The problem of parameter identification by Bayes point estimation using neural networks is investigated....

  11. SF Bay Water Quality Improvement Fund: Projects and Accomplishments

    San Francisco Bay Water Quality Improvement Fund (SFBWQIF) projects listed here are part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  12. South Bay Salt Pond Tidal Wetland Restoration Phase II Planning

    Information about the SFBWQP South Bay Salt Pond Tidal Wetland Restoration Phase II Planning project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic re

  13. South Bay Salt Pond Restoration, Phase II at Ravenswood

    Information about the South Bay Salt Pond Restoration Project: Phase II Construction at Ravenswood, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  14. Sediment grab data from October 1999 in Apalachicola Bay, Florida

    National Oceanic and Atmospheric Administration, Department of Commerce — The Apalachicola Bay National Estuarine Research Reserve and the NOAA Office for Coastal Management worked together to map benthic habitats within Apalachicola Bay,...

  15. 1999 RoxAnn Data Points from Apalachicola Bay, Florida

    National Oceanic and Atmospheric Administration, Department of Commerce — The Apalachicola Bay National Estuarine Research Reserve and the NOAA Office for Coastal Management worked together to map benthic habitats within Apalachicola Bay,...

  16. Nuclear Regulatory Commission issuances, April 1989

    1989-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances, July 1989

    1989-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances, March 1989

    1989-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Danish Atomic Energy Commission 1974/75

    1975-11-01

    Activities of the Danish Atomic Energy Commission and the Risoe eesearch Establishment for the period April1, 1974 to March 31, 1975 are summarized. The operations of the various facilities at the Research Establishment are revised. Operating staff levels and financial data are tabulated, a selected list of staff publications is given, and the design data on research facilities are presented. (B.P.)

  20. Nuclear Regulatory Commission issuances, August 1990

    1990-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. The European Commission as Network Broker

    Borrás, Susana

    2007-01-01

    after the year 2000. Developing a conceptual framework about brokerage roles in EU policy, the article uses a combination of quantitative and qualitative data in an empirical analysis of two very different cases where the Commission has been embattled the past years. The article argues that previous...

  2. Nuclear Regulatory Commission issuances, December 1989

    1989-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Ten years after the Jali Commission

    Ten years have lapsed since the Jali Commission's final report became publicly available, and it is therefore an .... as the 'core business' of the department. This was seen as .... the 2009/10–2013/14 DCS Strategic Plan did the department ...

  4. Nuclear Regulatory Commission issuances, May 1989

    1989-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. 76 FR 55424 - CFC-50 Commission

    2011-09-07

    ... conclude its work in approximately six months. 11. Termination. March 31, 2012. 12. Membership and... administrators of the campaign, participating charities and watchdog groups. These members will consist of both... Agency's approval, are responsible for directing the work of the Commission, including the creation of...

  6. Philippine Atomic Energy Commission: Annual report 1983

    1984-01-01

    This publication gives the highlights of the research and development projects of the Philippine Atomic Energy Commission in agriculture and food, nuclear fuels and power system technology, medicine, public health and nutrition, environmental surveillance, supportive basic research, social response to nuclear technology, nuclear licensing and safeguards, supportive technology and international and local linkages including manpower development. (ELC)

  7. Nuclear Regulatory Commission issuances, September 1987

    1987-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Bundled Discounts and the Antitrust Modernization Commission

    Aaron Panner

    2007-01-01

    The Report of the Antitrust Modernization Commission devotes relatively little space to antitrust common law – the judge-made doctrine that governs unreasonable restraints of trade under Section 1 and monopolization under Section 2 of the Sherman Act.

  9. Nuclear Regulatory Commission issuances, May 1990

    1990-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances, May 1987

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Division B Commission 40: Radio Astronomy

    Chapman, Jessica M.; Giovaninni, Gabriele; Taylor, Russell; Carilli, Christopher; Hills, Richard; Hirabayashi, Hisashi; Jonas, Justin L.; Lazio, Joseph; Morganti, Raffaella; Nan, Rendong; Rubio, Monica; Shastri, Prjaval; Kellermann, Ken; Ekers, Ronald; Ohishi, Masatoshi

    2016-01-01

    IAU Commission 40 for Radio Astronomy (hereafter C40) brought together scientists and engineers who carry out observational and theoretical research in radio astronomy and who develop and operate the ground and space-based radio astronomy facilities and instrumentation. As of June 2015, the

  12. Nuclear Regulatory Commission issuances, July 1988

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission Issuances, October 1986

    1986-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances, February 1989

    1989-02-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Commissioning of the ATLAS Liquid Argon Calorimeters

    Cooke, Mark S

    2009-01-01

    A selection of ATLAS liquid argon (LAr) calorimeter commissioning studies are presented. These include a coherent noise study, a measurement of the quality of the physics pulse shape prediction, and energy and time reconstruction analyses with cosmic and single beam signals.

  16. Agency transformation and state public utility commissions

    Jones, Douglas N.

    2006-01-01

    The demise of public utility commissions has been periodically predicted (sometimes hoped for). In their long history they have been attacked by critics as ineffective, inefficient, expensive, or unnecessary. Further, the demonstrated survivability of the commission concept has often been uncharitably attributed to powerful political constituencies, self-preservation manoeuvrings by commissioners themselves, and inertia. The implications of this article point another way. Commission regulation of public utilities has survived mainly because of continued need for social oversight of these critical industry sectors and the capacity of PUCs strategically to adapt to fundamental changes in their surroundings. Two transformational upheavals are treated here - a challenge of flexibility and responsiveness by the dramatic run-up in costs and prices in the 1970s and challenge to relevance by the policy shift to greater reliance on market competition in the 1990s - and regulation's successful accommodation to them. Viewed this way commission regulation is more in a position of 'second wind' than 'last breath'. (author)

  17. Survey commission of the Manche center

    2002-01-01

    The subjects discussed during the Survey commission of the storage center of the Manche CSCM, held in october 2001, are presented in this document. They deal with the site survey, the maintenance facilities realized on this installations, the tritium survey in the water and the CSCM operating. (A.L.B.)

  18. Nuclear Regulatory Commission issuances, June 1987

    1987-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decision (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances, October 1989

    1989-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Commissioning for the European XFEL facility

    Nölle, D.

    2017-06-01

    The European XFEL is a 4th generation light source based on the Self Amplified Spontaneous Emission (SASE) FreeElectron-Laser concept. It is currently being commissioned in North- Germany. The core installation is a 17.5 GeV superconducting accelerator driving 3 SASE lines with photon energies from 1 to beyond 20 keV range with a maximum of 27.000 pulses per second. The international facility is organized as a limited liability company with shareholders from the contributing countries. DESY has taken over the leadership of the accelerator construction consortium, and will be in charge of the operation of the accelerator complex. The facility was set up with contributions from the 11 shareholder countries, either being hardware systems and/or staff or cash contributions. The construction is almost complete, and the commissioning phase has started by the end of 2015. This contribution will report the status of the accelerator complex with emphasis on the commissioning of the accelerator and an outlook to the commissioning of the SASE 1 FEL line.

  1. Commissioning of the RFQ1 injector

    Arbique, G.M.; Sheikh, J.Y.; Taylor, T.; Birney, L.F.; Davidson, A.D.; Wills, J.S.C.

    1987-01-01

    The RFQ1 accelerator is being developed at Chalk River to test the limits of the cw RFQ technology. A 50 kV injector has been built and is now being commissioned as the first phase of the program. This paper describes some of the innovative features of the RFQ1 injector and reports on initial operating experience

  2. Nuclear Regulatory Commission issuances, December 1990

    1990-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances, April 1991

    1991-04-01

    This report includes the issuances received during the specified period (April 1991) from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regualtory Commission Issuances, October 1981

    1981-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors Denial (DD), and the Denial of Petitions for Rulemaking

  5. Status and commissioning of the CMS experiment

    Wulz, C.-E.

    2008-05-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  6. Status and Commissioning of the CMS Experiment

    Wulz, Claudia-Elisabeth

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  7. Status and commissioning of the CMS experiment

    Wulz, C-E

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented

  8. Nuclear Regulatory Commission issuances, April 1987

    1987-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission Issuances, August 1986

    1986-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances, November 1988

    1988-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission Issuances, March 1990

    1990-01-01

    The report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances, November 1987

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances, June 1990

    1990-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    D. Acosta

    Point 5 commissioning activities Since the last CMS week there has been little global commissioning activities: the first mid week global run aiming to assess the status of the hardware and DAQ software after the winter maintenance and developments has taken place two weeks ago involving all subdetectors but tracker and pixel whose hardware is still being actively worked on. The local commissioning restarted once the cooling became available again the third week of January. Below are detailed the main activities which have taken place so far. DAQ The activity of the central DAQ group during pause of global runs was focused on various items. The commissioning of the 900 new PCs which will be used to run the HLT processes has been almost completed. It is planned to use these PCs in the first global run at the start of March. In addition the location of various server PCs which host essential functionalities to get the private ".cms" network going, has been re-organized to allow to implemen...

  15. 76 FR 63325 - National Indian Gaming Commission

    2011-10-12

    ... General Accepted Accounting Principles (GAAP). Many comments stated that if this definition was amended... result in an enforcement action and closure order. 25 CFR 573.6(a)(7). II. Definitions--Net Revenues--management fee The NOI asked whether the Commission should consider whether the definition of net revenues...

  16. Nuclear Regulatory Commission issuances, February 1985

    1985-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. 76 FR 27034 - Equity and Excellence Commission

    2011-05-10

    .... The Commission will also make recommendations for restructuring school finance systems to achieve... educational opportunities that give rise to the achievement gap, with a focus on systems of finance, and recommend appropriate ways in which Federal policies could address such disparities. The agenda for the...

  18. 75 FR 48661 - Equity and Excellence Commission

    2010-08-11

    .... The Commission will also make recommendations for restructuring school finance systems to achieve... educational opportunities that give rise to the achievement gap, with a focus on systems of finance, and recommend appropriate ways in which Federal policies could address such disparities. In order to achieve...

  19. Nuclear Regulatory Commission issuances, November 1990

    1990-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Securities and Exchange Commission Semiannual Regulatory Agenda

    2010-12-20

    ... Flexibility Analysis Required: Yes Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...: Alicia Goldin, Division of Trading and Markets, Securities and Exchange Commission, 100 F Street NE... Flexibility Analysis Required: Yes Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...

  1. Appalachian Regional Commission: 1982 Annual Report.

    Appalachian Regional Commission, Washington, DC.

    Fiscal year 1982 was transitional for the Appalachian Regional Commission (ARC), as it was the last year of the broad economic development program and a year of reduced funding and new limits on programs. In 1981, Congress had requested that ARC prepare a plan for completion of the Appalachian highway system and for a 3 to 5 year ARC finish-up…

  2. Appalachian Regional Commission: 1979 Annual Report.

    Appalachian Regional Commission, Washington, DC.

    Narrative text, tables, maps, and photographs present an overview of the Appalachian Regional Commission's (ARC) activities in fiscal year 1979, past achievements, and future goals. Major accomplishments of 1979 include: utilization of the $233 million appropriation for highway construction; approval of over $143 million in ARC funds for 985…

  3. Meteorological research studies at Jervis Bay, Australia

    Clark, G.H.; Bendun, E.O.K.

    1974-07-01

    A climatological study of the winds and temperature from the Jervis Bay region which commenced in October 1970 has shown the presence of a coastal sea breeze and secondary bay breeze circulation system. In an attempt to define the influence of the Murray's Beach site on the local atmospheric dispersion, special smoke plume photography studies were conducted in the lower atmosphere. In June 1972 a meteorological acoustic sounding research programme was initiated at the Jervis Bay settlement. The aims of the research are to calibrate the sounder in terms of surface wind, turbulence and temperature measurements pertinent to a description of the lower atmospheric dispersion potential. Preliminary results on six months' data have shown encouraging correlations between the acoustic sounder patterns and particularly the wind direction turbulence traces. (author)

  4. Algae Reefs in Shark Bay, Western Australia, Australia

    1990-01-01

    Numerous algae reefs are seen in Shark Bay, Western Australia, Australia (26.0S, 113.5E) especially in the southern portions of the bay. The south end is more saline because tidal flow in and out of the bay is restricted by sediment deposited at the north and central end of the bay opposite the mouth of the Wooramel River. This extremely arid region produces little sediment runoff so that the waters are very clear, saline and rich in algae.

  5. Mapping Oyster Reef Habitats in Mobile Bay

    Bolte, Danielle

    2011-01-01

    Oyster reefs around the world are declining rapidly, and although they haven t received as much attention as coral reefs, they are just as important to their local ecosystems and economies. Oyster reefs provide habitats for many species of fish, invertebrates, and crustaceans, as well as the next generations of oysters. Oysters are also harvested from many of these reefs and are an important segment of many local economies, including that of Mobile Bay, where oysters rank in the top five commercial marine species both by landed weight and by dollar value. Although the remaining Mobile Bay oyster reefs are some of the least degraded in the world, projected climate change could have dramatic effects on the health of these important ecosystems. The viability of oyster reefs depends on water depth and temperature, appropriate pH and salinity levels, and the amount of dissolved oxygen in the water. Projected increases in sea level, changes in precipitation and runoff patterns, and changes in pH resulting from increases in the amount of carbon dioxide dissolved in the oceans could all affect the viability of oyster reefs in the future. Human activities such as dredging and unsustainable harvesting practices are also adversely impacting the oyster reefs. Fortunately, several projects are already under way to help rebuild or support existing or previously existing oyster reefs. The success of these projects will depend on the local effects of climate change on the current and potential habitats and man s ability to recognize and halt unsustainable harvesting practices. As the extent and health of the reefs changes, it will have impacts on the Mobile Bay ecosystem and economy, changing the resources available to the people who live there and to the rest of the country, since Mobile Bay is an important national source of seafood. This project identified potential climate change impacts on the oyster reefs of Mobile Bay, including the possible addition of newly viable

  6. Lost lake - restoration of a Carolina bay

    Hanlin, H.G.; McLendon, J.P. [Univ. of South Carolina, Aiken, SC (United States). Dept. of Biology and Geology; Wike, L.D. [Univ. of South Carolina, Aiken, SC (United States). Dept. of Biology and Geology]|[Westinghouse Savannah River Co., Aiken, SC (United States). Savannah River Technology Center; Dietsch, B.M. [Univ. of South Carolina, Aiken, SC (United States). Dept. of Biology and Geology]|[Univ. of Georgia, Aiken, SC (United States)

    1994-09-01

    Carolina bays are shallow wetland depressions found only on the Atlantic Coastal Plain. Although these isolated interstream wetlands support many types of communities, they share the common features of having a sandy margin, a fluctuating water level, an elliptical shape, and a northwest to southeast orientation. Lost Lake, an 11.3 hectare Carolina bay, was ditched and drained for agricultural production before establishment of the Savannah River Site in 1950. Later it received overflow from a seepage basin containing a variety of chemicals, primarily solvents and some heavy metals. In 1990 a plan was developed for the restoration of Lost Lake, and restoration activities were complete by mid-1991. Lost Lake is the first known project designed for the restoration and recovery of a Carolina bay. The bay was divided into eight soil treatment zones, allowing four treatments in duplicate. Each of the eight zones was planted with eight species of native wetland plants. Recolonization of the bay by amphibians and reptiles is being evaluated by using drift fences with pitfall traps and coverboard arrays in each of the treatment zones. Additional drift fences in five upland habitats were also established. Hoop turtle traps, funnel minnow traps, and dip nets were utilized for aquatic sampling. The presence of 43 species common to the region has been documented at Lost Lake. More than one-third of these species show evidence of breeding populations being established. Three species found prior to the restoration activity and a number of species common to undisturbed Carolina bays were not encountered. Colonization by additional species is anticipated as the wetland undergoes further succession.

  7. STS-98 Destiny in Atlantis's payload bay

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- The U.S. Laboratory Destiny rests once again in Atlantis'''s payload bay, at Launch Pad 39A. Closing of the payload bay doors is imminent. Destiny, a key element in the construction of the International Space Station, is 28 feet long and weighs 16 tons. This research and command-and-control center is the most sophisticated and versatile space laboratory ever built. It will ultimately house a total of 23 experiment racks for crew support and scientific research. Destiny will be launched Feb. 7 on STS-98, the seventh construction flight to the ISS.

  8. Management case study: Tampa Bay, Florida

    Morrison, G.; Greening, H.S.; Yates, K.K.

    2012-01-01

    Tampa Bay, Florida,USA, is a shallow,subtropical estuary that experienced severe cultural eutrophication between the 1940s and 1980s, a period when the human population of its watershed quadrupled. In response, citizen action led to the formation of a public- and private-sector partnership (the Tampa Bay Estuary Program), which adopted a number of management objectives to support the restoration and protection of the bay’s living resources. These included numeric chlorophyll a and water-clarity targets, as well as long-term goals addressing the spatial extent of sea grasses and other selected habitat types, to support estuarine-dependent faunal guilds.

  9. Chondrichthyan occurrence and abundance trends in False Bay ...

    Commercial fishing in False Bay, South Africa, began in the 1600s. Today chondrichthyans are regularly taken in fisheries throughout the bay. Using a combination of catch, survey and life history data, the occurrence and long-term changes in populations of chondrichthyans in False Bay are described. Analyses of time ...

  10. Curriculum for Commissioning Energy Efficient Buildings

    Webster, Lia [Portland Energy Conservation, Inc., OR (United States)

    2012-12-27

    In July 2010, the U.S. Department of Energy (DOE) awarded funding to PECI to develop training curriculum in commercial energy auditing and building commissioning. This program was created in response to the high demand for auditing and commissioning services in the U.S. commercial buildings market and to bridge gaps and barriers in existing training programs. Obstacles addressed included: lack of focus on entry level candidates; prohibitive cost and time required for training; lack of hands-on training; trainings that focus on certifications & process overviews; and lack of comprehensive training. PECI organized several other industry players to create a co-funded project sponsored by DOE, PECI, New York State Energy and Research Development Authority (NYSERDA), California Energy Commission (CEC), Northwest Energy Efficiency Alliance (NEEA) and California Commissioning Collaborative (CCC). After awarded, PECI teamed with another DOE awardee, New Jersey Institute of Technology (NJIT), to work collaboratively to create one comprehensive program featuring two training tracks. NJIT’s Center for Building Knowledge is a research and training institute affiliated with the College of Architecture and Design, and provided e-learning and video enhancements. This project designed and developed two training programs with a comprehensive, energy-focused curriculum to prepare new entrants to become energy auditors or commissioning authorities (CxAs). The following are the key elements of the developed trainings, which is depicted graphically in Figure 1: • Online classes are self-paced, and can be completed anywhere, any time • Commissioning Authority track includes 3 online modules made up of 24 courses delivered in 104 individual lessons, followed by a 40 hour hands-on lab. Total time required is between 75 and 100 hours, depending on the pace of the independent learner. • Energy Auditor track includes 3 online modules made up of 18 courses delivered in 72 individual

  11. 76 FR 22809 - Safety Zone; Bay Ferry II Maritime Security Exercise; San Francisco Bay, San Francisco, CA

    2011-04-25

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2011-0196] RIN 1625-AA00 Safety Zone; Bay Ferry II Maritime Security Exercise; San Francisco Bay, San Francisco, CA AGENCY... Security Exercise; San Francisco Bay, San Francisco, CA. (a) Location. The limits of this safety zone...

  12. Marine littoral diatoms from the Gordon’s bay region of False Bay, Cape Province, South Africa

    Giffen, MH

    1971-01-01

    Full Text Available and Comic/i for Scientific and Industrial Research, Pretoria (Received: 5.2. 1970) The Gordon?s Bay region occupies the north western corner of False Bay, a large rectangular bay, bounded on the west by the Cape Peninsula ending at Cape Point...

  13. San Francisco Bay Water Quality Improvement Fund Points, SF Bay CA, 2015, US EPA Region 9

    U.S. Environmental Protection Agency — The San Francisco Bay Water Quality Improvement Fund is a competitive grant program that is helping implement TMDLs to improve water quality, protect wetlands, and...

  14. 77 FR 57107 - Bandon Marsh, Nestucca Bay, and Siletz Bay National Wildlife Refuges, Coos, Tillamook, and...

    2012-09-17

    ... environmental, recreational, and socio-economic benefits and impacts of our LPP alternatives, and respond to... eco-tourism or natural resource-based visitor centers. Nestucca Bay NWR Alternative A: No Action Under...

  15. 75 FR 73121 - Bandon Marsh, Nestucca Bay, and Siletz Bay National Wildlife Refuges, Coos, Tillamook, and...

    2010-11-29

    ... County, Oregon. The refuge was established in 1991 with the acquisition of a 384-acre dairy farm, and has... pastures at Nestucca Bay NWR to tidal marsh, and what effect would this have on the refuge's ability to...

  16. Pärnu Bay Golf Club = Pärnu Bay Golf Club / Arhitekt11

    2016-01-01

    Pärnu Bay Golf Club, arhitektid Jürgen Lepper, Anto Savi, Margus Soonets, Janar Toomesso (Arhitekt11), sisearhitektid Liina Vaino, Kaari Metslang, Hannelore Kääramees (Arhitekt11). Kultuurkapitali Arhitektuuri sihtkapitali aastapreemia nominent 2016

  17. Optimization of the commissioning period of nuclear power plant

    Hou Ganglian; Li Chunyue

    2014-01-01

    Due to current equipment manufacture capacity, construction experience and other factors, commissioning of nuclear power projects was used to be postponed, which could lead to delay of the whole project. Based on the actual situation, optimization of commissioning period and its logic could be an effective way to improve this situation to some extent. Based on previous practice and experience in the schedule management for the commissioning nuclear power projects, this paper analyzes and discusses the characteristics of make commissioning plan and the difficulties of program implementation and strategies of commissioning plan optimization, discusses and presents ways of dynamic plan adjustment and optimization at the vision of entire project, synthesizes the methods of time management through commissioning itself, interface and management, expounds measures for the timing and optimization of commissioning schedule and commissioning period, and sums up the ways of optimization of commissioning period, improving management capabilities and control of optimization principles. (authors)

  18. 77 FR 30443 - Safety Zone; Alexandria Bay Chamber of Commerce, St. Lawrence River, Alexandria Bay, NY

    2012-05-23

    ...The Coast Guard proposes to establish a temporary safety zone on the St. Lawrence River, Alexandria Bay, NY. This proposed rule is intended to restrict vessels from a portion of the St. Lawrence River during the Alexandria Bay Chamber of Commerce fireworks display. The safety zone established by this proposed rule is necessary to protect spectators and vessels from the hazards associated with a fireworks display.

  19. Chesapeake Bay baseline data acquisition, toxics in the Chesapeake Bay. Final preliminary report, 1946-78

    1978-07-01

    This report identifies researchers, research activities, and data files applicable to the Chesapeake Bay estuarine system. The identified data were generated after 1973 on the following: submerged aquatic vegetation, shellfish bed closures, eutrophication, toxics accumulation in the food chain, dredging and spoil disposal, hydrologic modifications, modification of fisheries, shoreline erosion, wetlands alterations, and the effects of boating and shipping on water quality. Major past and current program monitoring in the Bay and its tributaries are summarized according to frequency

  20. Commissioning of long subsea pipelines - environmental aspects

    Falck, C.; Kleppe, T.; Maribu, J.

    1997-01-01

    Discharges to air and sea are inevitable during precommissioning and commissioning of long subsea pipelines. Large quantities of water is pumped through the pipeline during these operations. This water is normally treated with corrosion inhibiting chemicals to minimise internal corrosion of the pipeline. Chemicals like methanol or glycol may be used to prevent hydrate formation, and will normally be discharged to sea during commissioning. In order to minimise the environmental impact of these operations, while maintaining corrosion protection, the Norwegian Statoil has been working for several years along three main routes such as to develop concepts and methods that minimise the discharged volumes, the use of the most environmentally friendly chemicals available, and to monitor and identify the effects of discharges to various marine species. 3 refs., 4 figs

  1. Programme of the Commission for 1978. [Booklet

    1978-01-01

    Mr. Jenkins, President of the Commission, first examines the problem of the economy and the level of its unemployment in the Community, resulting in a lack of growth. He than presents the two-fold aim of the Commission--to instigate emergency action to sustain industries that are no longer fully competitive and to promote economic growth to provide employment and prosperity. He then examins the energy and agriculture sectors. Two obligations cited for the Community are: (1) to defend Community interests in the energy field in relation to Third World Countries, and (2) to make clear the connections between energy policy and the general economic strategy. Negotiations are underway for enlargement of the community with applications being considered for Greece, Portugal, and Spain. A memorandum annexed to the address contains additional material on building an integrated economic unit, the European citizen and his environment, Europe in the world, and enlargement of the community. (MCW)

  2. A History of the Atomic Energy Commission

    Buck, Alice L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

  3. LHC Damper Beam commissioning in 2010

    Höfle, W; Schokker, M; Valuch, D

    2011-01-01

    The LHC transverse dampers were commissioned in 2010 with beam and their use at injection energy of 450 GeV, during the ramp and in collisions at 3.5 TeV for Physics has become part of the standard operations pro- cedure. The system proved important to limit emittance blow-up at injection and to maintain smaller than nominal emittances throughout the accelerating cycle. We describe the commissioning of the system step-by-step as done in 2010 and summarize its performance as achieved for pro- ton as well as ion beams in 2010. Although its principle function is to keep transverse oscillations under control, the system has also been used as an exciter for abort gap clean- ing and tune measurement. The dedicated beam position measurement system with its low noise properties provides additional possibilities for diagnostics.

  4. Activity report 2015 Commission Perspectives du Reseau

    Ricour, Olivia

    2016-01-01

    This document contains the activity report for 2015 of the Commission Perspectives du Reseau which has been set up by RTE to be the main body for organising a dialogue with all the actors of the energy sector and civil society about challenges and stakes of the electric power system on the medium and on the long term. It describes how this body aims at sharing knowledge and expertise of all stakeholders (publications, European platform for data transparency), at being a place for debating and enriching the understanding of tomorrow's important stakes for the power system (discussion of the issue of greenhouse gas emissions with an analysis of the impact of the CO 2 price signal on emissions by the European electricity system and results of the e-Highway 2050 European project). The road-map of the Commission works for 2016 is provided, as well as a list of members

  5. Nuclear Regulatory Commission issuances, May 1993

    1993-05-01

    This report contains the issuances received during the specified period (May 1993) from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not deemed a part of these opinions or have any independent legal significance. Contents of this document include an Issuance of the Nuclear Regulatory Commission with respect to the Sacramento Municipal Utility District and Issuances of Directors' Decisions concerning the Interstate Nuclear Service Corporation; Niagara Mohawk Power Corporation; and Texas Utilities Electric Company, et al. and All Nuclear Power Plants with Thermo-Lag Fire Barriers

  6. Nuclear Regulatory Commission Information Digest 1992 edition

    Olive, K.

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed

  7. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    A. Ryd and T. Camporesi

    2010-01-01

    Commissioning and Run Coordination activities After the successful conclusion of the LHC pilot run commissioning in 2009 activities at the experiment restarted only late in January due to the cooling and detector maintenance. As usual we got going with weekly exercises used to deploy, debug, and validate improvements in firmware and software. A debriefing workshop aimed at analyzing the operational aspects of the 2009 pilot run was held on Jan. 15, 2009, to define a list of improvements (and relative priorities) to be planned. In the last month, most of the objectives set in the debriefing workshop have been attained. The major achievements/improvements obtained are the following: - Consolidation of the firmware for both readout and trigger for ECAL - Software implementation of procedures for raising the bias voltage of the silicon tracker and pixel driven by LHC mode changes with automatic propagation of the state changes from the DCS to the DAQ. The improvements in the software and firmware allow suppress...

  8. Canadian Nuclear Safety Commission's intern program

    Gilmour, P.E.

    2002-01-01

    The Intern Program was introduced at the Canadian Nuclear Safety Commission, Canada's Nuclear Regulator in response to the current competitive market for engineers and scientists and the CNSC's aging workforce. It is an entry level staff development program designed to recruit and train new engineering and science graduates to eventually regulate Canada's nuclear industry. The program provides meaningful work experience and exposes the interns to the general work activities of the Commission. It also provides them with a broad awareness of the regulatory issues in which the CNSC is involved. The intern program is a two-year program focusing on the operational areas and, more specifically, on the generalist functions of project officers. (author)

  9. Commissioning of the TRIUMF ISAC RF system

    Fong, K.; Fang, S.; Laverty, M.; Lu, J.; Poirier, R.L.

    2001-09-01

    The ISAC RF system at present consists of a Radio Frequency Quadrupole accelerator, five Drift Tube Linear Accelerators, six bunchers, two choppers and a bunch rotator. The RFQ operates at the fundamental frequency of 35.36 MHz, while the DTLs operate at the third harmonic frequency of 106.08 MHz. The operating power ranges from 45 W to 120 W for the choppers, 1 kW to 20 kW for the DTLs and bunchers, and 80 kW for the RFQ. These cavities have been commissioned to operate synchronously with both closed-loop amplitude and phase regulation, as well as automatic tuning of the cavities. This paper gives a brief summary of the commissioning experience. (author)

  10. History of the Atomic Energy Commission

    Buck, A.L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations

  11. Status of the SPIRAL2 injector commissioning

    Thuillier, T., E-mail: thuillier@lpsc.in2p3.fr; Angot, J.; Jacob, J.; Lamy, T.; Sole, P. [LPSC, Université Grenoble Alpes, CNRS/IN2P3, 53 rue des Martyrs, 38026 Grenoble Cedex (France); Barué, C.; Bertrand, P.; Canet, C.; Ferdinand, R.; Flambard, J.-L.; Jardin, P.; Lemagnen, F.; Maunoury, L.; Osmond, B. [GANIL, CNRS/IN2P3, Bvd Henri Becquerel, BP 55027, 14076 Caen Cedex 5 (France); Biarrotte, J. L. [IPN Orsay, Université Paris Sud, CNRS/IN2P3, 15 rue Georges Clémenceau, 91406 Orsay Cedex (France); Denis, J.-F.; Roger, A.; Touzery, R.; Tuske, O.; Uriot, D. [Irfu, CEA Saclay, DSM/Irfu/SACM, 91191 Gif Sur Yvette (France); and others

    2016-02-15

    The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed.

  12. History of the Atomic Energy Commission

    Buck, A.L.

    1982-08-01

    This pamphlet traces the history of the Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946, to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations

  13. Nuclear Regulatory Commission Information Digest, 1991 edition

    Olive, K.L.

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs

  14. Division V: Commission 42: Close Binaries

    Ribas, Ignasi; Richards, Mercedes T.; Rucinski, Slavek; Bradstreet, David H.; Harmanec, Petr; Kaluzny, Janusz; Mikolajewska, Joanna; Munari, Ulisse; Niarchos, Panagiotis; Olah, Katalin; Pribulla, Theodor; Scarfe, Colin D.; Torres, Guillermo

    2015-08-01

    Commission 42 (C42) co-organized, together with Commission 27 (C27) and Division V (Div V) as a whole, a full day of science and business sessions that were held on 24 August 2012. The program included time slots for discussion of business matters related to Div V, C27 and C42, and two sessions of 2 hours each devoted to science talks of interest to both C42 and C27. In addition, we had a joint session between Div IV and Div V motivated by the proposal to reformulate the division structure of the IAU and the possible merger of the two divisions into a new Div G. The current report gives an account of the matters discussed during the business session of C42.

  15. Elemental analysis of Uranouchi bay seabed sludge using PIXE

    Kabir, M. Hasnat; Narusawa, Tadashi; Nishiyama, Fumitaka; Sumi, Katsuhiro

    2006-01-01

    Elemental analyses were carried out for the seabed sludge collected from Uranouchi bay (Kochi, Japan) using Particle Induced X-ray Emission (PIXE). Seabed-sludge contamination with heavy metals as well as toxic elements becomes one of the most serious environmental problems. The aim of the present study is to investigate the polluted areas in the bay by heavy and toxic elements. As a results of analyses of samples collected from eleven different places in the bay, seventeen elements including toxic ones were detected. The results suggest that the center region of the bay is seriously contaminated by heavy and toxic elements in comparison with the other areas in the bay. (author)

  16. PEMANFATAN TEOREMA BAYES DALAM PENENTUAN PENYAKIT THT

    Sri Winiarti

    2012-05-01

    Full Text Available Dalam konsep pelacakan dalam mencari solusi dengan pendekatan artificial inteligent, ada berbagai metode  yang dapat diterapkan untuk mengatasi masalah ketidakpastian saat proses pelacakan terjadi. Salah satunya adalah teorema bayes. Adanya ketidakpastian pada proses pelacakan dapat terjadi karena adanya perubahan pengetahuan yang ada di dalam sistem. Untuk itu diperlukan adanya suatu metode untuk mengatasi permasalahan tersebut. Dalam penelitian ini telah diterapkan suatu metode untuk mengatasi ketidakpastian dengan teorema Bayes pada kasus pelacakan untuk mendiagnosa penyakit pada THT (Telinga,Hidung dan Tenggorokan.  Subjek pada penelitian ini adalah proses pelacakan untuk menentukan penyakit THT dengan model penalaran forward chaining dan metode kepastiannya menggunakan teorema bayes dengan cara menghitung nilai probabilitas suatu penyakit dan membandingkan probabilitas setiap gejalanya. Model pengembangan perangkat lunak yang digunakan dalam penelitian ini adalah Waterfall. Metode Waterfall diawali dengan analisis data, perancangan sistem, pengkodean menggunakan Visual Basic 6.0, pengujian sistem dengan black box test dan alfa test. Dari penelitian yang dilakukan menghasilkan sebuah perangkat lunak yaitu  yang mampu menentukan penyakit pada THT dengan menerapkan metode bayes untuk mengatasi ketidakpastian. Hasil uji coba sistem menujukkan bahwa aplikasi ini layak dan dapat digunakan.

  17. Radioactive source management in Daya Bay NPP

    Mao Chun Yang

    2000-01-01

    'Small sources causes big accidents' had occurred worldwide many times. Radioactive source management in Nuclear Power Plant in very important for its safety record. This paper introduces the way and experience of radioactive source management in Daya Bay NPP from aspects of clarifying the responsibilities, centralizing the management of high radioactivity sources, work process management and experience feedback etc. (author)

  18. Bathymetry (2011) for Fish Bay, St. John

    National Oceanic and Atmospheric Administration, Department of Commerce — This image represents a LiDAR (Light Detection & Ranging) 0.3x0.3 meter resolution depth surface for Fish Bay, St. John in the U.S. Virgin Islands (USVI). The...

  19. Sediment Characterization in St. Alban's Bay, VT

    Nethercutt, S.; Manley, T.; Manley, P.

    2017-12-01

    St. Alban's Bay within Lake Champlain is plagued with harmful algal blooms. With future intensification due to climate change, a multidisciplinary program (BREE-Basin Resilience to Extreme Events) was initiated in 2016. In order to assess the mobilization of harmful nutrients from sediment resuspension events and riverine input, 74 sediment samples were collected in a grid fashion throughout St. Alban's Bay. Sediments were deflocculated and analyzed using a LA920 Horiba laser scattering particle size distribution analyzer to define the frequency of sediment sizes from clay to sand. Gridded surfaces of mean sortable silt percentage, silt percentage, sand percentage, and clay percentage were used to represent the sediment distribution of the region. A plot of diameter versus frequency showed the bimodal nature of some of the sediments, with one peak at about 10 microns diameter (silt) and the second at about 525 microns diameter (sand). The data showed an extremely low percentage of clay relative to that of sand and silt. The highest frequencies of sortable silt, which represents the most easily mobilized particle size, are found in the deepest areas of the bay, suggesting that these regions are where dominant bottom flow occurs. The high occurrence of sortable silt in the St. Alban's Bay does suggest that sediment mobilization, and therefore nutrient mobilization has the potential to occur. These data combined with high-resolution multibeam and hydrodynamic data will allow for future models of water flow and remobilization studies in the future.

  20. Underwater Gravity Survey of Northern Monterey Bay.

    stations were occupied just above the swash zone. A complete Bouguer anomaly map was drawn and tied in with the previous land surveys and with one...covering the southern half of the bay. The isolines of the complete Bouguer anomaly indicate the relative vertical position of the basement complex Santa

  1. Padilla Bay: The Estuary Guide. Level 2.

    Friesem, Judy; Lynn, Valerie, Ed.

    Estuaries are marine systems that serve as nurseries for animals, links in the migratory pathways, and habitat for a complex community of organisms. This curriculum guide intended for use at the middle school level is designed for use with the on-site program developed by the Padilla Bay National Esturine Research Reserve (Washington). The guide…

  2. Carolina bays of the Savannah River Plant

    Schalles, J.F. (Creighton Univ., Omaha, NE (USA)); Sharitz, R.R.; Gibbons, J.W.; Leversee, G.J.; Knox, J.N. (Savannah River Ecology Lab., Aiken, SC (USA))

    1989-01-01

    Much of the research to date on the Carolina bays of the Savannah River Plant and elsewhere has focused on certain species or on environmental features. Different levels of detail exist for different groups of organisms and reflect the diverse interests of previous investigators. This report summarizes aspects of research to date and presents data from numerous studies. 70 refs., 14 figs., 12 tabs.

  3. Fecal indicator bacteria at Havana Bay

    Lopez Perez, Lisse; Gomez D'Angelo, Yamiris; Beltran Gonzalez, Jesus; Alvarez Valiente, Reinaldo

    2013-01-01

    Aims: Fecal indicator bacteria concentrations were evaluated in Havana Bay. Methods: Concentrations of traditional fecal indicator bacteria were calculated between April 2010 and February 2011, by MPN methods. Concentrations of thermo tolerant coliform (CTT), Escherichia coli, fecal streptococci (EF), intestinal enterococci (ENT) in seawater, and Clostridium perfringens in sediment surface, were determined. Results: CTT and E. coli levels were far above Cuban water quality standard for indirect contact with water, showing the negative influence of sewage and rivers on the bay. The EF and ENT were measured during sewage spills at the discharge site and they were suitable indicators of fecal contamination, but these indicators didn't show the same behavior in other selected sites. This result comes from its well-known inactivation by solar light in tropical zones and the presumable presence of humid acids in the waters of the bay. Conclusion: Fecal indicator bacteria and its statistical relationships reflect recent and chronic fecal contamination at the bay and near shores.

  4. Tortuguero Bay [Puerto Rico] environmental studies

    Wood, E.D.; Youngbluth, M.J.; Nutt, M.E.; Yoshioka, P.; Canoy, M.J.

    1975-01-01

    Site selection surveys and environmental research studies of seven coastal sites in Puerto Rico for construction of power generating facilities were carried out. Data are presented on the physical, chemical, and geological parameters of the Tortuguero Bay site, and the ecological parameters of zooplankton, benthic invertebrates, plant and fish communities. (U.S.)

  5. Roebuck Bay Invertebrate and bird Mapping 2006

    Piersma, Theunis; Pearson, Grant B.; Hickey, Robert; Dittmann, Sabine; Rogers, Danny I.; Folmer, Eelke; Honkoop, Pieter; Drent, Jan; Goeij, Petra de; Marsh, Loisette

    2006-01-01

    1. This is a report on a survey of the benthic ecology of the intertidal flats along the northern shores of Roebuck Bay in June 2006. In the period 11-20 June we mapped both the invertebrate macrobenthic animals (those retained by a 1 mm sieve) over the whole of the northern intertidal area of

  6. Morphological features in the Bay of Bengal

    Sarma, K.V.L.N.S.; Ramana, M.V.; Subrahmanyam, V.; Krishna, K.S.; Ramprasad, T.; Desa, M.

    history of the Fan. After India's soft collision with the Eurasian plate, these events may have played a critical role in shaping various morphological features since late Eocene in the Bay of Bengal. The present 12 kHz Echo sounder data collected along...

  7. ULF fluctuations at Terra Nova Bay (Antarctica

    A. Meloni

    2000-06-01

    Full Text Available ULF geomagnetic field measurements in Antarctica are a very important tool for better understanding the dynamics of the Earth’s magnetosphere and its response to the variable solar wind conditions. We review the results obtained in the last few years at the Italian observatory at Terra Nova Bay

  8. Saginaw Bay, MI LiDAR

    National Oceanic and Atmospheric Administration, Department of Commerce — TASK NAME:(NRCS) Saginaw Bay, MI LiDAR LiDAR Data Acquisition and Processing Production Task USGS Contract No. G10PC00057 Task Order No. G11PD01254 Woolpert Order...

  9. Empirical Bayes Approaches to Multivariate Fuzzy Partitions.

    Woodbury, Max A.; Manton, Kenneth G.

    1991-01-01

    An empirical Bayes-maximum likelihood estimation procedure is presented for the application of fuzzy partition models in describing high dimensional discrete response data. The model describes individuals in terms of partial membership in multiple latent categories that represent bounded discrete spaces. (SLD)

  10. Divergent Priors and well Behaved Bayes Factors

    R.W. Strachan (Rodney); H.K. van Dijk (Herman)

    2011-01-01

    textabstractDivergent priors are improper when defined on unbounded supports. Bartlett's paradox has been taken to imply that using improper priors results in ill-defined Bayes factors, preventing model comparison by posterior probabilities. However many improper priors have attractive properties

  11. Bathymetry (2011) for Coral Bay, St. John

    National Oceanic and Atmospheric Administration, Department of Commerce — This image represents a LiDAR (Light Detection & Ranging) 0.3x0.3 meter resolution depth surface for Coral Bay, St. John in the U.S. Virgin Islands (USVI). The...

  12. Nuclear Regulatory Commission issuances, September 1988

    1988-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  13. Securities and Exchange Commission Semiannual Regulatory Agenda

    2010-04-26

    ...: 3235-AK58 420. REVISIONS TO REGULATION D Legal Authority: 15 USC 77b(a)(15); 15 USC 77b(b); 15 USC 77d; 15 USC 77r; 15 USC 77s; 15 USC 77s(a); 15 USC 77z-3 Abstract: The Division is considering... SOLICITATION ENHANCEMENTS Legal Authority: 15 USC 78n Abstract: The Commission proposed amendments to its proxy...

  14. Viet Nam National Atomic Energy Commission

    1992-01-01

    Vietnam National Atomic Energy Commission (VINATOM) is a governmental body in charge of organizing and coordinating activities related to use of nuclear energy for peaceful purpose. VINATOM in structure consists of the Nuclear Research Institute (Dalat), the Institute of Nuclear Science and Technology (Hanoi), the Institute for Technology of Radioactive and Rare Elements (Hanoi), and the Centre for Nuclear Technique Application (Ho Chi Minh City). This catalogue introduces profiles of nuclear R and D activities under management by VINATOM. (N.H.A)

  15. Indexes to Nuclear Regulatory Commission Issuances

    1996-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index

  16. European commission report on market opening

    Anon.

    2005-01-01

    Governments must step up their effort to implement measures relating to market opening within the framework of the directives on gas and electricity. Only greater integration of national markets will produce the improvements required from a competitive point of view on the domestic energy market. These are the main conclusions of the annual report on domestic electricity and gas market operation adopted by the European Commission at the beginning of January 2005. (author)

  17. Indexes to Nuclear Regulatory Commission Issuances

    NONE

    1996-12-31

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index.

  18. COMMISSIONING CNI PROTON POLARIMETERS IN RHIC

    HUANG, H.; BRAVAR, A.; LI, Z.; MACKAY, W.W.; MAKDISI, Y.; RESCIA, S.; ROSER, T.; SURROW, B.; BUNCE, G.; DESHPANDE, A.; GOTO, Y.; ET AL

    2002-01-01

    Two polarimeters based on proton carbon elastic scattering in the Coulomb Nuclear Interference (CNI) region have been installed and commissioned in the Blue and Yellow rings of RHIC during the first RHIC polarized proton collider run. Each polarimeter consists of ultra-thin carbon targets and six silicon detectors. With newly developed wave form digitizers, they provide fast and reliable polarization information for both rings

  19. Philippine Atomic Energy Commission: Annual report 1982

    1983-02-01

    This publication enumerates the research and development activities of the Philippine Atomic Energy Commission with priorities geared towards achieving the economic and social upliftment of the Filipinos in the field of agriculture, energy, industry, health and environment. Highlights are summaries of investigations and studies of great importance in crop improvement, animal production, nuclear fuels, nutrition research, not to mention its supportive technology, technical services, nuclear information and public acceptance, and nuclear manpower development. (RTD)

  20. Pb’s high sedimentation inside the bay mouth of Jiaozhou Bay

    Yang, Dongfang; Miao, Zhenqing; Huang, Xinmin; Wei, Linzhen; Feng, Ming

    2017-12-01

    Sedimentation is one of the key environmental behaviors of pollutants in the ocean. This paper analyzed the seasonal and temporal variations of Pb’s sedimentation process in Jiaozhou Bay in 1987. Results showed that Pb contents in bottom waters in Jiaozhou Bay in May, July and November 1987 were 1.87-2.60 μg L-1, 15.11-19.68 μg L-1 and 11.08-15.18 μg L-1, and the pollution levels of Pb in May, July and November 1987 were slight, heavy and heavy, respectively. In May 1987, there was low sedimentation process in waters in the outside of the bay mouth, yet were high sedimentation process in waters in the middle and inside of the bay mouth. In July and November 1987, there was low sedimentation process in waters in the outside of the bay mouth, yet were high sedimentation process in waters in the inside of the bay mouth. The seasonal-temporal variation of sedimentation processes of Pb were determined by the variations of sources input and the vertical water’s effect.

  1. Responses of upland herpetofauna to the restoration of Carolina Bays and thinning of forested Bay Margins.

    Ledvina, Joseph A.

    2008-05-01

    Research on the effects of wetland restoration on reptiles and amphibians is becoming more common, but almost all of these studies have observed the colonization of recently disturbed habitats that were completely dry at the time of restoration. In a similar manner, investigations herpetofaunal responses to forest management have focused on clearcuts, and less intensive stand manipulations are not as well studied. To evaluate community and population responses of reptiles and amphibians to hydrology restoration and canopy removal in the interior of previously degraded Carolina bays, I monitored herpetofauna in the uplands adjacent to six historically degraded Carolina bays at the Savannah River Site (SRS) in South Carolina for four years after restoration. To evaluate the effects of forest thinning on upland herpetofauna, forests were thinned in the margins of three of these bays. I used repeated measures ANOVA to compare species richness and diversity and the abundance of selected species and guilds between these bays and with those at three reference bays that were not historically drained and three control bays that remained degraded. I also used Non-metric Multidimensional Scaling (NMDS) to look for community-level patterns based treatments.

  2. Microbial biogeography of San Francisco Bay sediments

    Lee, J. A.; Francis, C. A.

    2014-12-01

    The largest estuary on the west coast of North America, San Francisco Bay is an ecosystem of enormous biodiversity, and also enormous human impact. The benthos has experienced dredging, occupation by invasive species, and over a century of sediment input as a result of hydraulic mining. Although the Bay's great cultural and ecological importance has inspired numerous surveys of the benthic macrofauna, to date there has been almost no investigation of the microbial communities on the Bay floor. An understanding of those microbial communities would contribute significantly to our understanding of both the biogeochemical processes (which are driven by the microbiota) and the physical processes (which contribute to microbial distributions) in the Bay. Here, we present the first broad survey of bacterial and archaeal taxa in the sediments of the San Francisco Bay. We conducted 16S rRNA community sequencing of bacteria and archaea in sediment samples taken bimonthly for one year, from five sites spanning the salinity gradient between Suisun and Central Bay, in order to capture the effect of both spatial and temporal environmental variation on microbial diversity. From the same samples we also conducted deep sequencing of a nitrogen-cycling functional gene, nirS, allowing an assessment of evolutionary diversity at a much finer taxonomic scale within an important and widespread functional group of bacteria. We paired these sequencing projects with extensive geochemical metadata as well as information about macrofaunal distribution. Our data reveal a diversity of distinct biogeographical patterns among different taxa: clades ubiquitous across sites; clades that respond to measurable environmental drivers; and clades that show geographical site-specificity. These community datasets allow us to test the hypothesis that salinity is a major driver of both overall microbial community structure and community structure of the denitrifying bacteria specifically; and to assess

  3. Commissioning an Engineering Scale Coal Gasifier

    Reid, Douglas J.; Bearden, Mark D.; Cabe, James E.

    2010-07-01

    This report explains the development, commissioning, and testing of an engineering scale slagging coal gasifier at PNNL. The initial objective of this project was to commission the gasifier with zero safety incidents. The commissioning work was primarily an empirical study that required an engineering design approach. After bringing the gasifier on-line, tests were conducted to assess the impact of various operating parameters on the synthesis gas (syngas) product composition. The long-term intent of this project is to produce syngas product for use by internal Pacific Northwest National Laboratory (PNNL) researchers in catalyst, materials, and instrumentation development. Future work on the project will focus on improving the reliability and performance of the gasifier, with a goal of continuous operation for greater than 4 hours using coal feedstock. In addition, alternate designs that allow for increased flexibility regarding the fuel sources that can be used for syngas production is desired. Continued modifications to the fuel feed system will be pursued to address these goals. Alternative feed mechanisms such as a coal/methanol slurry are being considered.

  4. Nuclear Regulatory Commission Information Digest: 1993 edition

    1993-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the U.S. Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1992, with exceptions noted. Information on generating capacity and average capacity factor for operating U.S. commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed. Comments and/or suggestions on the data presented are welcomed and should be directed to Karen Olive, United States Nuclear Regulatory Commission, Office of the Controller, Division of Budget and Analysis, Washington, D.C. 20555. For detailed and complete information about tables and figures, refer to the source publications

  5. NSLS-II commissioning and operation

    Wang, G., E-mail: gwang@bnl.gov; Shaftan, T.; Bassi, G.; Bengtsson, J.; Blednykh, A.; Blum, E.; Cheng, W.; Choi, J.; Davidsaver, M.; Doom, L.; Fliller, R.; Ganetis, G.; Guo, W.; Hidaka, Y.; Kramer, S.; Li, Y.; Podobedov, B.; Qian, K.; Rose, J.; Seletskiy, S. [Brookhaven National Laboratory, Upton, NY 11973 (United States); and others

    2016-07-27

    The National Synchrotron Light Source II at Brookhaven National Lab is a third-generation synchrotron radiation facility that has been commissioned in 2014. The facility is based on a 3 GeV electron storage ring, which will circulate 500 mA of beam current at 1 nm rad horizontal emittance. The storage ring is 792 meters in circumference and will accommodate more than 60 beamlines in the final built-out. The beamline sources range from insertion-devices located in straight sections, bending magnets or three-pole-wigglers configured in multiple branches. The NSLS-II storage ring commissioning was successfully completed in July 2014 and the facility delivered the first user light on October 23, 2014. Currently the storage ring reached 300 mA beam current and achieved 1 nm rad of horizontal emittance with 3 sets of Damping Wigglers. At this point six NSLS-II project beamlines are routinely taking photons with beam current at 150 mA. This paper reviews the NSLS-II accelerator design and commissioning experience.

  6. CEBAF Cryomodule Commissioning in the South Linac

    M. Drury; H. Lankford; T. Lee; J. Marshall; J. Preble; Q. Saulter; W. Schneider; Michael Spata; Mark Wiseman

    1993-01-01

    When complete, the Continuous Electron Beam Accelerator Facility will house a 4 GeV recirculating linear accelerator containing 42 1/4 cryomodules arrayed in two antiparallel linacs and an injector. Currently, 38 1/4 cryomodules have been installed. Each cryomodule contains eight superconducting niobium 5-cell rf cavities that operate at 1.497 GHz[1]. A cryomodule must provide an energy gain of 20 MeV to the 200 mu-A beam[2]. The resultant dynamic heat load must be less than 45 W. The cavity parameters that are measured during the commissioning process include the external Q's (Q(sub ext)) of the cavity ports, the unloaded Q (Q(sub 0)) of the cavity as a function of accelerating gradient, and the maximum operating gradient of the cavity[3]. Finally, the mechanical tuners are cycled and characterized. A portable test stand allows local control of the rf system and provides automated data acquisition. During the period from April 1993 through September 1993, 16 of the 20 cryomodules installed in the South Linac were commissioned. All cryomodules tested in the South Linac meet or exceed the CEBAF specifications. This paper describes the results of the commissioning of the first 10 cryomodules in the South Linac

  7. Identification of spatiotemporal nutrient patterns in a coastal bay via an integrated k-means clustering and gravity model.

    Chang, Ni-Bin; Wimberly, Brent; Xuan, Zhemin

    2012-03-01

    This study presents an integrated k-means clustering and gravity model (IKCGM) for investigating the spatiotemporal patterns of nutrient and associated dissolved oxygen levels in Tampa Bay, Florida. By using a k-means clustering analysis to first partition the nutrient data into a user-specified number of subsets, it is possible to discover the spatiotemporal patterns of nutrient distribution in the bay and capture the inherent linkages of hydrodynamic and biogeochemical features. Such patterns may then be combined with a gravity model to link the nutrient source contribution from each coastal watershed to the generated clusters in the bay to aid in the source proportion analysis for environmental management. The clustering analysis was carried out based on 1 year (2008) water quality data composed of 55 sample stations throughout Tampa Bay collected by the Environmental Protection Commission of Hillsborough County. In addition, hydrological and river water quality data of the same year were acquired from the United States Geological Survey's National Water Information System to support the gravity modeling analysis. The results show that the k-means model with 8 clusters is the optimal choice, in which cluster 2 at Lower Tampa Bay had the minimum values of total nitrogen (TN) concentrations, chlorophyll a (Chl-a) concentrations, and ocean color values in every season as well as the minimum concentration of total phosphorus (TP) in three consecutive seasons in 2008. The datasets indicate that Lower Tampa Bay is an area with limited nutrient input throughout the year. Cluster 5, located in Middle Tampa Bay, displayed elevated TN concentrations, ocean color values, and Chl-a concentrations, suggesting that high values of colored dissolved organic matter are linked with some nutrient sources. The data presented by the gravity modeling analysis indicate that the Alafia River Basin is the major contributor of nutrients in terms of both TP and TN values in all seasons

  8. Rapid Crustal Uplift at Birch Bay, Washington

    Sherrod, B. L.; Kelsey, H. M.; Blakely, R. J.

    2010-12-01

    Geomorphology and coastal marsh stratigraphy suggest late Holocene uplift of the shoreline at Birch Bay, located northwest of Bellingham, Washington, during an earthquake on a shallow fault. LiDAR images show a raised, late Holocene shoreline along Birch Bay, with ~1 m of elevation difference between the modern shoreline and the inferred paleoshoreline. Commercial seismic reflection images reveal an anticline in Tertiary and possibly Quaternary deposits underlying Birch Bay. NW-trending magnetic anomalies are likely associated with the Birch Bay anticline and other nearby structures. Taken together, the geophysical data and lidar images suggest uplift of young deposits along a NW-trending blind reverse fault. Stratigraphy from Terrell Creek marsh, located just south of Birch Bay, shows freshwater peat buried by lower intertidal muds, indicating local submergence ~1300 yr BP. Stratigraphy of a 70-cm sediment core from Birch Bay marsh, sitting astride the anticline imaged with seismic reflection data, shows mud buried by detrital peat. One radiocarbon age from the core places the abrupt change from mud to peat prior to 1520-1700 yr BP. We divide fossil diatom assemblages straddling the mud-peat contact at Birch Bay into three zones. The oldest zone consists primarily of intertidal and marine diatoms, dominated by Paralia sulcata, Scoleoneis tumida, Grammataphora oceanica, and Gyrosigma balticum. An intermediate zone, beginning at the sharp contact between mud and overlying peat, consists of a mixture of brackish marsh and freshwater species, dominated by Diploneis interrupta, with lesser amounts of Aulacoseira sp., Pinnularia viridis, Eunotia pectinalis, and Paralia sulcata. A third and youngest zone lies in the upper half of the peat and is dominated by poorly preserved freshwater diatoms, mostly Aulacoseira cf. crassapuntata, Pinnularia viridis, P. maior, Eunotia pectinalis, and E. praerupta. Paleoecological inferences, based on distributions of modern diatoms

  9. POTENTIAL HAZARDS OF SEDIMENT IN KENDARI BAY, SOUTHEAST SULAWESI

    Nur Adi Kristanto

    2017-07-01

    Full Text Available Kendari bay is located in front of Kendari city. There are two harbors in the inner part of bay which very important to support economic activities such as shipping and passenger transportation. The result of coastal characteristic mapping and physical oceanography survey show various coastal morphology, vegetation, weathering processes, sedimentation, currents, and water depth and sea floor morphology. Kendari bay is an enclosed bay; the area is wide in the inner part and narrow in mouth of bay (outlet, the morphology look like a bottle’s neck. Numerous mouth rivers are concentrate around the bay. The rivers load material from land since erosion on land is intensive enough. There is indication that sediment supplies from land trough river mouth not equivalent with outlet capacity. Sediment load is trapped in the inner bay caused the outlet morphology. So high sediment rate play an important role in the process of shallow of water depth in Kendari bay. This condition make the Kendari bay is a prone area of sediment hazard due to height rate of sedimentary process. Therefore, to anticipate the hazards, precaution should be taken related to the Kendari bay as the center of activities in southeast of Sulawesi. The further survey is needed such as marine geotechnique and on land environmental to collect data, which can be used as database for development planning. Key words: Potential hazard, sediment, Kendari Bay Teluk

  10. Holocene evolution of Apalachicola Bay, Florida

    Osterman, L.E.; Twichell, D.C.; Poore, R.Z.

    2009-01-01

    A program of geophysical mapping and vibracoring was conducted to better understand the geologic evolution of Apalachicola Bay. Analyses of the geophysical data and sediment cores along with age control provided by 34 AMS 14C dates on marine shells and wood reveal the following history. As sea level rose in the early Holocene, fluvial deposits filled the Apalachicola River paleochannel, which extended southward under the central part of the bay and seaward across the continental shelf. Sediments to either side of the paleochannel contain abundant wood fragments, with dates documenting that those areas were forested at 8,000 14C years b.p. As sea level continued to rise, spits formed of headland prodelta deposits. Between ???6,400 and ???2,500 14C years b.p., an Apalachicola prodelta prograded and receded several times across the inner shelf that underlies the western part of the bay. An eastern deltaic lobe was active for a shorter time, between ???5,800 and 5,100 14C years b.p. Estuarine benthic foraminiferal assemblages occurred in the western bay as early as 6,400 14C years b.p., and indicate that there was some physical barrier to open-ocean circulation and shelf species established by that time. It is considered that shoals formed in the region of the present barrier islands as the rising sea flooded an interstream divide. Estuarine conditions were established very early in the post-glacial flooding of the bay. ?? 2009 US Government.

  11. Topobathymetric model of Mobile Bay, Alabama

    Danielson, Jeffrey J.; Brock, John C.; Howard, Daniel M.; Gesch, Dean B.; Bonisteel-Cormier, Jamie M.; Travers, Laurinda J.

    2013-01-01

    Topobathymetric Digital Elevation Models (DEMs) are a merged rendering of both topography (land elevation) and bathymetry (water depth) that provides a seamless elevation product useful for inundation mapping, as well as for other earth science applications, such as the development of sediment-transport, sea-level rise, and storm-surge models. This 1/9-arc-second (approximately 3 meters) resolution model of Mobile Bay, Alabama was developed using multiple topographic and bathymetric datasets, collected on different dates. The topographic data were obtained primarily from the U.S. Geological Survey (USGS) National Elevation Dataset (NED) (http://ned.usgs.gov/) at 1/9-arc-second resolution; USGS Experimental Advanced Airborne Research Lidar (EAARL) data (2 meters) (http://pubs.usgs.gov/ds/400/); and topographic lidar data (2 meters) and Compact Hydrographic Airborne Rapid Total Survey (CHARTS) lidar data (2 meters) from the U.S. Army Corps of Engineers (USACE) (http://www.csc.noaa.gov/digitalcoast/data/coastallidar/). Bathymetry was derived from digital soundings obtained from the National Oceanic and Atmospheric Administration’s (NOAA) National Geophysical Data Center (NGDC) (http://www.ngdc.noaa.gov/mgg/geodas/geodas.html) and from water-penetrating lidar sources, such as EAARL and CHARTS. Mobile Bay is ecologically important as it is the fourth largest estuary in the United States. The Mobile and Tensaw Rivers drain into the bay at the northern end with the bay emptying into the Gulf of Mexico at the southern end. Dauphin Island (a barrier island) and the Fort Morgan Peninsula form the mouth of Mobile Bay. Mobile Bay is 31 miles (50 kilometers) long by a maximum width of 24 miles (39 kilometers) with a total area of 413 square miles (1,070 square kilometers). The vertical datum of the Mobile Bay topobathymetric model is the North American Vertical Datum of 1988 (NAVD 88). All the topographic datasets were originally referenced to NAVD 88 and no transformations

  12. 17 CFR 146.9 - Appeals to the Commission.

    2010-04-01

    ... Commission or any Commission employee has failed or refused to comply with provisions of the Privacy Act or... disagreement has been filed shall clearly note the portion which is disputed, and include a copy of the...

  13. Commissioning of Nuclear Power Plants. The AREVA approach

    Mateo, G.

    2014-01-01

    Georges Mateo, Fellow Expert at AREVA, closed the last day of conferences by detailing deeply the different phases of NPPs commissioning. He insisted on the skills required to be a Commissioning engineer and on the carrier opportunities that it offers

  14. Decommissioning and radioactive waste management. The European Commission overview

    Rehak, M

    2010-01-01

    In this lecture author deals with the European Commission overview on the decommissioning and radioactive waste management. Financial support of European Commission of decommissioning of the Ignalina NPP, Bohunice V1 NPP and Kozloduy Units 1 and 2 is presented.

  15. Final environmental statement for decommissioning Humboldt Bay Power Plant, Unit No. 3 (Docket No. 50-133)

    1987-04-01

    The Final Environmental Statement contains the assessment of the environmental impact associated with decommissioning the Humboldt Bay Power Plant Unit 3 pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. The proposed decommissioning would involve safe storage of the facility for about 30 years, after which the residual radioactivity would be removed so that the facility would be at levels of radioactivity acceptable for release of the facility to unrestricted access

  16. Draft Environmental Statement for decommissioning Humboldt Bay Power Plant, Unit No. 3 (Docket No. 50-133)

    1986-04-01

    This Draft Environmental Statement (DES) contains th assessment of the environmental impact associated with decommissioning the Humboldt Bay Power Plant Unit 3 located 4 miles southwest of the city of Eureka, Humboldt County, California. This DES is prepared pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. The proposed decommissioning would involve safe storage of the facility for about 30 years, after which the residual radioactivity would be removed so that the facility would be at levels of radioactivity acceptable for release of the facility to unrestricted access. 26 refs

  17. International Commission on Radiological Protection. History, policies, procedures

    Lindell, Bo; Dunster, H.J.; Valentin, Jack; )

    2000-01-01

    This report briefly reviews the history, mode of operation, concepts, and current policies of the International Commission on Radiological Protection (ICRP). It touches upon the objectives of the Commission's recommendations, the quantities used, the biological basis of the Commission's policy, the quantitative basis for its risk estimates, the structure of the system of protection, some problems of interpretation and application in that system, and the need for stability, consistency, and clarity in the Commission's recommendations. (author)

  18. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    NONE

    1998-02-24

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  19. Stepwise commissioning of a steam boiler with stability guarantees

    Johansen, Simon Vestergaard; Kallesøe, Carsten Skovmose; Bendtsen, Jan Dimon

    2016-01-01

    This paper aims to make the commissioning of an industrial MIMO controller more straightforward by gradually commissioning it from a set of SISO controllers, after the system has been started. For this purpose a stepwise commissioning strategy based on the Youla-Kucera parametrization has been de...... been commissioned from a SISO controller using the developed method on a real steam boiler and measurements show a clear performance improvement after transition....

  20. C46 `ASTRONOMY Education and Development': a Peculiar Commission

    de Greve, Jean-Pierre; García, Beatriz; Gerbaldi, Michèle; Ferlet, Roger; Guinan, Edward; Hearnshaw, John; Jones, Barrie; Marschall, Laurence; Miley, George; Pasachoff, Jay; Ros, Rosa; Stavinschi, Magda; Torres-Peimbert, Silvia

    2016-04-01

    C46 was a Commission of the Executive Committee of the IAU under Division XII (Union-Wide Activities), then after 2012 under Division C (Education, Outreach, and Heritage). It was the only commission dealing exclusively with astronomy education; a previous Commission 38 (Exchange of Astronomers), which allocated travel grants to astronomers who needed them, and a Working Group on the Worldwide Development of Astronomy, have been absorbed by Commission 46.