WorldWideScience

Sample records for mw wellhead generator

  1. Wellhead compression

    Energy Technology Data Exchange (ETDEWEB)

    Harrington, Joe [Sertco Industries, Inc., Okemah, OK (United States); Vazquez, Daniel [Hoerbiger Service Latin America Inc., Deerfield Beach, FL (United States); Jacobs, Denis Richard [Hoerbiger do Brasil Industria de Equipamentos, Cajamar, SP (Brazil)

    2012-07-01

    Over time, all wells experience a natural decline in oil and gas production. In gas wells, the major problems are liquid loading and low downhole differential pressures which negatively impact total gas production. As a form of artificial lift, wellhead compressors help reduce the tubing pressure resulting in gas velocities above the critical velocity needed to surface water, oil and condensate regaining lost production and increasing recoverable reserves. Best results come from reservoirs with high porosity, high permeability, high initial flow rates, low decline rates and high total cumulative production. In oil wells, excessive annulus gas pressure tends to inhibit both oil and gas production. Wellhead compression packages can provide a cost effective solution to these problems by reducing the system pressure in the tubing or annulus, allowing for an immediate increase in production rates. Wells furthest from the gathering compressor typically benefit the most from wellhead compression due to system pressure drops. Downstream compressors also benefit from higher suction pressures reducing overall compression horsepower requirements. Special care must be taken in selecting the best equipment for these applications. The successful implementation of wellhead compression from an economical standpoint hinges on the testing, installation and operation of the equipment. Key challenges and suggested equipment features designed to combat those challenges and successful case histories throughout Latin America are discussed below.(author)

  2. Operating experiences with 1 MW steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Sano, A; Kanamori, A; Tsuchiya, T

    1975-07-01

    1 MW steam generator, which was planned as the first stage of steam generator development in Power Reactor and Nuclear Fuel Corp. (PNC) in Japan, is a single-unit, once-through, integrated shell and tube type with multi-helical coil tubes. It was completed in Oarai Engineering Center of PNC in March of 1971, and the various performance tests were carried out up to April, 1972. After the dismantle of the steam generator for structural inspection and material test, it was restored with some improvements. In this second 1 MW steam generator, small leak occurred twice during normal operation. After repairing the failure, the same kind of performance tests as the first steam generator were conducted in order to verify the thermal insulation effect of argon gas in downcomer zone from March to June, 1974. In this paper the above operating experiences were presented including the outline of some performance test results. (author)

  3. Leakage experiences with 1 MW steam generator

    International Nuclear Information System (INIS)

    Kanamori, A.; Kawara, M.; Sano, A.

    1975-01-01

    An 1 MW steam generator was tested from October, 1971 and completed with the first series of experiments by May, 1972 after 3600 hours of operation. During these tests, unextraordinary heat absorption was experienced in the downcomer region, which led to shortage of heat transfer area to attain the rated steam temperature and to one of the reasons of flow instabilities. The steam generator was disassembled to get test pieces for structure as well as material examinations and then it was reassembled to proceed the second series of tests. Before it was done, a modification was provided to insulate the downcomer region by putting a gas space around the downcomer tube. The gas space was provided by a dual tube and spacers were welded on the inner tube and an end plate was welded on upper parts between the two to seal the gap by means of fillet welding. After the modified steam generator was put into operation, water happened to leak into a sodium side two times through these additional welding spots for the gas insulation. This paper presents operating conditions and behaviors of monitors at the time of the leakages, identifications of leaked spots, an evaluation of causes and a treatment or a precaution for them

  4. Lightweight MgB2 superconducting 10 MW wind generator

    Science.gov (United States)

    Marino, I.; Pujana, A.; Sarmiento, G.; Sanz, S.; Merino, J. M.; Tropeano, M.; Sun, J.; Canosa, T.

    2016-02-01

    The offshore wind market demands a higher power rate and more reliable turbines in order to optimize capital and operational costs. The state-of-the-art shows that both geared and direct-drive conventional generators are difficult to scale up to 10 MW and beyond due to their huge size and weight. Superconducting direct-drive wind generators are considered a promising solution to achieve lighter weight machines. This work presents an innovative 10 MW 8.1 rpm direct-drive partial superconducting generator using MgB2 wire for the field coils. It has a warm iron rotor configuration with the superconducting coils working at 20 K while the rotor core and the armature are at ambient temperature. A cooling system based on cryocoolers installed in the rotor extracts the heat from the superconducting coils by conduction. The generator's main parameters are compared against a permanent magnet reference machine, showing a significant weight and size reduction. The 10 MW superconducting generator concept will be experimentally validated with a small-scale magnetic machine, which has innovative components such as superconducting coils, modular cryostats and cooling systems, and will have similar size and characteristics as the 10 MW generator.

  5. Lightweight MgB2 superconducting 10 MW wind generator

    International Nuclear Information System (INIS)

    Marino, I; Pujana, A; Sarmiento, G; Sanz, S; Merino, J M; Tropeano, M; Sun, J; Canosa, T

    2016-01-01

    The offshore wind market demands a higher power rate and more reliable turbines in order to optimize capital and operational costs. The state-of-the-art shows that both geared and direct-drive conventional generators are difficult to scale up to 10 MW and beyond due to their huge size and weight. Superconducting direct-drive wind generators are considered a promising solution to achieve lighter weight machines. This work presents an innovative 10 MW 8.1 rpm direct-drive partial superconducting generator using MgB 2 wire for the field coils. It has a warm iron rotor configuration with the superconducting coils working at 20 K while the rotor core and the armature are at ambient temperature. A cooling system based on cryocoolers installed in the rotor extracts the heat from the superconducting coils by conduction. The generator’s main parameters are compared against a permanent magnet reference machine, showing a significant weight and size reduction. The 10 MW superconducting generator concept will be experimentally validated with a small-scale magnetic machine, which has innovative components such as superconducting coils, modular cryostats and cooling systems, and will have similar size and characteristics as the 10 MW generator. (paper)

  6. Design and operating experiences with 50MW steam generator

    International Nuclear Information System (INIS)

    Kawara, M.; Yamaki, H.; Kanamori, A.; Tanaka, K.; Takahashi, T.

    1975-01-01

    The main purpose of the 50 MW steam generator is to have experiences of manufacturing and operation with large scale steam generator including necessary research and development works which can be reflected on the design and fabrication of 'Monju' (Japan 300 MWe prototype LMFBR). The detailed design of the 50 MW steam, generator was begun on March, 1972 and succeeded in the demonstration of 72 hours continuous operation with full power on June, 1974. It has been successfully operated since then, the performances of which have been evaluated through various kinds of tests. In this paper, the following items are mainly discussed system design, thermal and hydraulic design, structure and fabrication and some experiences on testing operation including cleaning and sodium flushing of equipment, sodium level control system, the behavior of hydrogen detection system and general outlook of the performance. (author)

  7. Design and operating experiences with 50MW steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Kawara, M; Yamaki, H; Kanamori, A; Tanaka, K; Takahashi, T

    1975-07-01

    The main purpose of the 50 MW steam generator is to have experiences of manufacturing and operation with large scale steam generator including necessary research and development works which can be reflected on the design and fabrication of 'Monju' (Japan 300 MWe prototype LMFBR). The detailed design of the 50 MW steam, generator was begun on March, 1972 and succeeded in the demonstration of 72 hours continuous operation with full power on June, 1974. It has been successfully operated since then, the performances of which have been evaluated through various kinds of tests. In this paper, the following items are mainly discussed system design, thermal and hydraulic design, structure and fabrication and some experiences on testing operation including cleaning and sodium flushing of equipment, sodium level control system, the behavior of hydrogen detection system and general outlook of the performance. (author)

  8. Feasibility study of 5MW superconducting wind turbine generator

    DEFF Research Database (Denmark)

    Abrahamsen, Asger Bech; Jensen, Bogi Bech; Seiler, E.

    2011-01-01

    The feasibility of installing a direct drive superconducting generator in the 5MW reference offshore wind turbine of the National Renewable Energy Laboratory (NREL) has been examined. The engineering current densities Je obtained in a series of race track coils have been combined with magnetization...... measurements to estimate the properties of suitable field coils for a synchronous generator, which is more light weight than the conventional used combination of a gear box and a fast rotating generator. An analytical model and finite element simulations have been used to estimate the active mass of generators...

  9. A 1500-MW(e) HTGR nuclear generating station

    International Nuclear Information System (INIS)

    Stinson, R.C.; Hornbuckle, J.D.; Wilson, W.H.

    1976-01-01

    A conceptual design of a 1500-MW(e) HTGR nuclear generating station is described. The design concept was developed under a three-party arrangement among General Atomic Company as nuclear steam supply system (NSSS) supplier, Bechtel Power Corporation as engineer-constructors of the balance of plant (BOP), and Southern California Edison Company as a potential utility user. A typical site in the lower Mojave Desert in southeastern California was assumed for the purpose of establishing the basic site criteria. Various alternative steam cycles, prestressed concrete reactor vessel (PCRV) and component arrangements, fuel-handling concepts, and BOP layouts were developed and investigated in a programme designed to lead to an economic plant design. The paper describes the NSSS and BOP designs, the general plant arrangement and a description of the site and its unique characteristics. The elements of the design are: the use of four steam generators that are twice the capacity of GA's steam generators for its 770-MW(e) and 1100-MW(e) units; the rearrangement of steam and feedwater piping and support within the PCRV; the elimination of the PCRV star foundation to reduce the overall height of the containment building as well as of the PCRV; a revised fuel-handling concept which permits the use of a simplified, grade-level fuel storage pool; a plant arrangement that permits a substantial reduction in the penetration structure around the containment while still minimizing the lengths of cable and piping runs; and the use of two tandem-compound turbine generators. Plant design bases are discussed, and events leading to the changes in concept from the reference 8-loop PCRV 1500-MW(e) HTGR unit are described. (author)

  10. Design Tool for 5-20 MW Direct Drive Generators

    DEFF Research Database (Denmark)

    Leban, Krisztina Monika; Ritchie, Ewen; Argeseanu, Alin

    2014-01-01

    This paper reports on a machine design tool for large (5-10MW) direct drive electrical generator. The aim of the work is to construct a flexible calculation tool that enables the analysis of different ideas and concepts for generator design. The tool is intended for engineers that are involved...... in the design of wind turbine systems. The design tool comprises calculation modules that are kept as independent as possible from each other so that new machine geometries and types can be modelled by reusing, recombining and modifying the different modules. Choice of the most suitable candidates...

  11. 5MW Direct Drive Wind Turbine Generator Design

    DEFF Research Database (Denmark)

    Zaidi, Arsalan; Senn, Lucile; Ortega, Iratxe

    2012-01-01

    A 5MW direct drive offshore wind turbine generator was studied and simulated using Vector Fields OPERA. This software allows calculation of the flux density, force, torque, and eddy currents in the machine at different rotor positions. Based on the data obtained from the model, initial assumptions...... for the suitable machine are listed and the modelling process presented. The model of the generator was improved by changing design parameters, e.g the position of the magnets or fitting additional I-Cores, and analyse the effect of it....

  12. Curvas de arranque de unidades de 100 MW // Starting Graphs of generating units of 100 MW.

    Directory of Open Access Journals (Sweden)

    J. L. Rodríguez Olivera

    2000-03-01

    Full Text Available Se exponen las principales consideraciones para los arranques de las unidades de 100 MW en función del estado térmico yse establecen modelos de comportamiento de los principales parámetros a partir de cualquier estado térmico inicial. Paraello se parte de los métodos establecidos en las instrucciones de explotación vigentes y de las curvas de arranques delfabricante. Los modelos de variación de los parámetros fundamentales permiten obtener las curvas de arranque de estasunidades para cualquier estado térmico inicial, lo que reporta una disminución en los tiempos de puesta en servicio, ahorrode combustible en los arranques, el control y evaluación de los arranques y una mayor seguridad durante la explotación delas unidades. Se presenta un software para la obtención de estos gráficos y toda la información de los arranques.Palabras claves: Gráficos de arranque, unidades térmicas, turbinas de vapor.____________________________________________________________________________AbstractThe principal considerations for the starting of the 100 MW units are exposed in function of thermal state and behavior modelsare established of principal parameters from any thermal initial state are established.The work is based on the performance instructions of stablished methods and starting graphs supply by the manufacturer. Thevariation models of fundamental parameters allow us to obtain the base curves of these units for any thermal initial state. Alsoallow: a diminution in the set times of put on line, saving fuel, evaluation and control of the starting stage and a great securityduring the service of these generating units. A software that allowed to obtain all the starting information and the suitablegraphs is exposed.Key words: Starting graphs, thermal generating units, steam turbine, power plants.

  13. Some results of the 50 MW straight tube steam generator test in the TNO 50 MW SCTF at Hengelo

    International Nuclear Information System (INIS)

    Ludwig, P.W.P.H.; Hus, B.M.

    1975-01-01

    A prototype 50 MW straight tube steam generator has been tested during more than 3000 hours under operating conditions. The steady state, transient and stability behaviour were tested. The most remarkable results of the experiments are given. (author)

  14. Some results of the 50 MW straight tube steam generator test in the TNO 50 MW SCTF at Hengelo

    Energy Technology Data Exchange (ETDEWEB)

    Ludwig, P W.P.H.; Hus, B M

    1975-07-01

    A prototype 50 MW straight tube steam generator has been tested during more than 3000 hours under operating conditions. The steady state, transient and stability behaviour were tested. The most remarkable results of the experiments are given. (author)

  15. Dismantling of the 50 MW steam generator test facility

    International Nuclear Information System (INIS)

    Nakai, S.; Onojima, T.; Yamamoto, S.; Akai, M.; Isozaki, T.; Gunji, M.; Yatabe, T.

    1997-01-01

    We have been dismantling the 50MW Steam Generator Test Facility (50MWSGTF). The objectives of the dismantling are reuse of sodium components to a planned large scale thermal hydraulics sodium test facility and the material examination of component that have been operated for long time in sodium. The facility consisted of primary sodium loop with sodium heater by gas burner as heat source instead of reactor, secondary sodium loop with auxiliary cooling system (ACS) and water/steam system with steam temperature and pressure reducer instead of turbine. It simulated the 1 loop of the Monju cooling system. The rated power of the facility was 50MWt and it was about 1/5 of the Monju power plant. Several sodium removal methods are applied. As for the components to be dismantled such as piping, intermediate heat exchanger (IHX), air cooled heat exchangers (AC), sodium is removed by steam with nitrogen gas in the air or sodium is burned in the air. As for steam generators which material tests are planned, sodium is removed by steam injection with nitrogen gas to the steam generator. The steam generator vessel is filled with nitrogen and no air in the steam generator during sodium removal. As for sodium pumps, pump internal structure is pulled out from the casing and installed into the tank. After the installation, sodium is removed by the same method of steam generator. As for relatively small reuse components such as sodium valves, electromagnet flow meters (EMFs) etc., sodium is removed by alcohol process. (author)

  16. Wellhead with non-ferromagnetic materials

    Energy Technology Data Exchange (ETDEWEB)

    Hinson, Richard A [Houston, TX; Vinegar, Harold J [Bellaire, TX

    2009-05-19

    Wellheads for coupling to a heater located in a wellbore in a subsurface formation are described herein. At least one wellhead may include a heater located in a wellbore in a subsurface formation; and a wellhead coupled to the heater. The wellhead may be configured to electrically couple the heater to one or more surface electrical components. The wellhead may include at least one non-ferromagnetic material such that ferromagnetic effects are inhibited in the wellhead. Systems and methods for using such wellheads for treating a subsurface formation are described herein.

  17. Comparison of superconducting generators and permanent magnet generators for 10-MW direct-drive wind turbines

    DEFF Research Database (Denmark)

    Liu, Dong; Polinder, Henk; Abrahamsen, Asger Bech

    2016-01-01

    Large offshore direct-drive wind turbines of 10-MW power levels are being extensively proposed and studied because of a reduced cost of energy. Conventional permanent magnet generators currently dominating the direct-drive wind turbine market are still under consideration for such large wind...... turbines. In the meantime, superconducting generators (SCSGs) have been of particular interest to become a significant competitor because of their compactness and light weight. This paper compares the performance indicators of these two direct-drive generator types in the same 10-MW wind turbine under...... the same design and optimization method. Such comparisons will be interesting and insightful for commercialization of superconducting generators and for development of future wind energy industry, although SCSGs are still far from a high technology readiness level. The results show that the SCSGs may...

  18. Wellhead and tree standards updated

    International Nuclear Information System (INIS)

    Dach, A.J. Jr.; Haeberle, T.

    1996-01-01

    Revisions in the API 6A, 17th Edition, have resolved a number of long-term problems and expanded its scope and coverage of wellhead and christmas tree equipment. The 17th Edition, Feb. 1, 1996, represents the state-of-the-art in international requirements for wellhead and christmas tree equipment. The design, materials, and quality control aspects of API 6A have all been improved with an emphasis on making the document more acceptable around the world. However, there are unresolved issues that raise many questions about the future direction of efforts aimed at international standardization of wellhead and christmas tree equipment. Unfortunately, these unresolved issues confuse both manufacturers and companies purchasing this equipment. This ultimately increases wellhead and christmas tree costs, so it is to everyone's advantage to resolve these issues. This article describes the significant revisions that are included in API 6A, 17th Edition. Also discussed are the regulatory, standardization, and customer acceptance issues that cloud the future of API 6A, 17th Edition

  19. Cost comparison of 4x500 MW coal-fuelled and 4x850 MW CANDU nuclear generating stations

    International Nuclear Information System (INIS)

    Costa, M.

    1981-01-01

    The lifetime costs for a 4x850 MW CANDU generating station are compared to those for 4x500 MW bituminous coal-fuelled generating stations. Two types of coal-fuelled stations are considered; one burning U.S. coal which includes flue gas desulfurization and one burning Western Canadian coal. Current estimates for the capital costs, operation and maintenance costs, fuel costs, decommissioning costs and irradiated fuel management costs are shown. The results show: (1) The accumulated discounted costs of nuclear generation, although initially higher, are lower than coal-fuelled generation after two or three years. (2) Fuel costs provide the major contribution to the total lifetime costs for coal-fuelled stations whereas capital costs are the major item for the nuclear station. (3) The break even lifetime capacity factor between nuclear and U.S. coal-fuelled generation is projected to be 5%; that for nuclear and Canadian coal-fuelled generation is projected to be 9%. (4) Large variations in the costs are required before the cost advantage of nuclear generation is lost. (5) Comparison with previous results shows that the nuclear alternative has a greater cost advantage in the current assessment. (6) The total unit energy cost remains approximately constant throughout the station life for nuclear generation while that for coal-fuelled generation increases significantly due to escalating fuel costs. The 1978 and 1979 actual total unit energy cost to the consumer for several Ontario Hydro stations are detailed, and projected total unit energy costs for several Ontario Hydro stations are shown in terms of escalated dollars and in 1980 constant dollars

  20. The new 6 MW gas turbine for the power generation; Die neue 6 MW Gasturbine fuer die Stromerzeugung

    Energy Technology Data Exchange (ETDEWEB)

    Blaswich, Michael; Theis, Sascha [MAN Diesel and Turbo SE, Oberhausen (Germany)

    2012-07-01

    MAN Diesel and Turbo SE (Oberhausen, Federal Republic of Germany) had developed a new gas turbine in the 6 MW class. This device is the founding stone for a family of gas turbines which at first cover the power range from 6 to 8 MW for the propulsion of pumps, compressors and electric devices. The two-shaft industrial gas turbine consists of a gas generator with an axial compressor with eleven levels, six external single combustion chambers, one two-step high-pressure turbine and a two-step power turbine. Beside the two-shaft industrial gas turbine, there exists a single-shaft industrial gas turbine for the power generation. The single-shaft industrial gas turbine consists of three turbine stages, a gas turbine compressor and combustion chamber being identical in construction to the two-shaft industrial gas turbine. The gas turbine package contains the gas turbine module as well as a filter module. The gas turbine was successfully tested. Further tests and the commissioning of the first customer's plant are planned for this year.

  1. Tri-generation in Lisbon: 60 MW coldness, 44 MW heat, 5 MW electric power, 44 km of network; Trigeneration a Lisbonne: 60 MW froid, 44 MW chaud, 5 MW electricite, 44 km de reseau

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2001-11-01

    A tri-generation facility in Lisbon (Portugal) uses the chilled water produced by absorption units (water + lithium bromide) in association with compression groups (ammonia). The combination of both technologies allows to optimize the production of chilled water which is also stored for a better adaptability of use. This facility will supply 450000 m{sup 2} of offices, 150000 m{sup 2} of commercial buildings, 50000 m{sup 2} of public facilities, a marina and about 10000 apartments, which represents a total of 2.5 million of m{sup 2}. A huge network of insulated steel pipes ensures the district heating/cooling of the new industrial area of Lisbon. (J.S.)

  2. New excitation equipment for 220 MW generators in Kozloduy NPP

    International Nuclear Information System (INIS)

    Tomerlin, D.

    2001-01-01

    Rehabilitation on the excitation equipment for Generator 5, Reactor Unit 3, in Kozloduy NPP was completed in November 2000. ABB's Static Excitation System based on UNITROL 5000 technology has been chosen by the Bulgarian National Utility and Kozloduy NPP to substitute the original Russian excitation system equipment with electro-magnetic voltage regulators. The substitution is in a rehabilitation package of four excitation system equipment for Generator 5 and 6 of Reactor Unit 3 and Generator 7 and 8 of Reactor Unit 4 after a short overview of the original excitation system this paper describes the new Static Excitation System UNITROL 5000 including configuration with block diagram, its main features and merits such as modes of operation, limiter, special control functions and diagnostic facilities. Furthermore, new facilities, which are implemented in UNITROL 5000, such as dynamic current distribution among the thyristors working in parallel as well as the start-up from the residual magnetism are mentioned. Special functions including a so-called free-running mode of operation and automatic change over sequence from new excitation system to the stand-by excitation system, which is DC exciter machine, are described. Some records of the transient responses performed during the commissioning and a photograph of a manufactured system are provided. (author)

  3. Optimized Generator Designs for the DTU 10-MW Offshore Wind Turbine using GeneratorSE

    Energy Technology Data Exchange (ETDEWEB)

    Sethuraman, Latha; Maness, Michael; Dykes, Katherine

    2017-01-09

    Compared to land-based applications, offshore wind imposes challenges for the development of next generation wind turbine generator technology. Direct-drive generators are believed to offer high availability, efficiency, and reduced operation and maintenance requirements; however, previous research suggests difficulties in scaling to several megawatts or more in size. The resulting designs are excessively large and/or massive, which are major impediments to transportation logistics, especially for offshore applications. At the same time, geared wind turbines continue to sustain offshore market growth through relatively cheaper and lightweight generators. However, reliability issues associated with mechanical components in a geared system create significant operation and maintenance costs, and these costs make up a large portion of overall system costs offshore. Thus, direct-drive turbines are likely to outnumber their gear-driven counterparts for this market, and there is a need to review the costs or opportunities of building machines with different types of generators and examining their competitiveness at the sizes necessary for the next generation of offshore wind turbines. In this paper, we use GeneratorSE, the National Renewable Energy Laboratory's newly developed systems engineering generator sizing tool to estimate mass, efficiency, and the costs of different generator technologies satisfying the electromagnetic, structural, and basic thermal design requirements for application in a very large-scale offshore wind turbine such as the Technical University of Denmark's (DTU) 10-MW reference wind turbine. For the DTU reference wind turbine, we use the previously mentioned criteria to optimize a direct-drive, radial flux, permanent-magnet synchronous generator; a direct-drive electrically excited synchronous generator; a medium-speed permanent-magnet generator; and a high-speed, doubly-fed induction generator. Preliminary analysis of leveled costs of

  4. Optimized Generator Designs for the DTU 10-MW Offshore Wind Turbine using GeneratorSE: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Sethuraman, Latha; Maness, Michael; Dykes, Katherine

    2017-01-01

    Compared to land-based applications, offshore wind imposes challenges for the development of next generation wind turbine generator technology. Direct-drive generators are believed to offer high availability, efficiency, and reduced operation and maintenance requirements; however, previous research suggests difficulties in scaling to several megawatts or more in size. The resulting designs are excessively large and/or massive, which are major impediments to transportation logistics, especially for offshore applications. At the same time, geared wind turbines continue to sustain offshore market growth through relatively cheaper and lightweight generators. However, reliability issues associated with mechanical components in a geared system create significant operation and maintenance costs, and these costs make up a large portion of overall system costs offshore. Thus, direct-drive turbines are likely to outnumber their gear-driven counterparts for this market, and there is a need to review the costs or opportunities of building machines with different types of generators and examining their competitiveness at the sizes necessary for the next generation of offshore wind turbines. In this paper, we use GeneratorSE, the National Renewable Energy Laboratory's newly developed systems engineering generator sizing tool to estimate mass, efficiency, and the costs of different generator technologies satisfying the electromagnetic, structural, and basic thermal design requirements for application in a very large-scale offshore wind turbine such as the Technical University of Denmark's (DTU) 10-MW reference wind turbine. For the DTU reference wind turbine, we use the previously mentioned criteria to optimize a direct-drive, radial flux, permanent-magnet synchronous generator; a direct-drive electrically excited synchronous generator; a medium-speed permanent-magnet generator; and a high-speed, doubly-fed induction generator. Preliminary analysis of leveled costs of

  5. Simulation of a MW rotor equipped with vortex generators using CFD and an actuator shape model

    DEFF Research Database (Denmark)

    Troldborg, Niels; Zahle, Frederik; Sørensen, Niels N.

    2015-01-01

    This article presents a comparison of CFD simulations of the DTU 10 MW reference wind turbine with and without vortex generators installed on the inboard part of the blades. The vortex generators are modelled by introducing body forces determined using a modified version of the so-called BAY mode...

  6. Synchronous Generator with HTS-2G field coils for Windmills with output power 1 MW

    Science.gov (United States)

    Kovalev, K.; Kovalev, L.; Poltavets, V.; Samsonovich, S.; Ilyasov, R.; Levin, A.; Surin, M.

    2014-05-01

    Nowadays synchronous generators for wind-mills are developed worldwide. The cost of the generator is determined by its size and weight. In this deal the implementation of HTS-2G generators is very perspective. The application of HTS 2G field coils in the rotor allows to reduce the size of the generator is 1.75 times. In this work the design 1 MW HTS-2G generator is considered. The designed 1 MW HTS-2G generator has the following parameters: rotor diameter 800 mm, active length 400 mm, phase voltage 690V, rotor speed 600 min-1 rotor field coils with HTS-2G tapes. HTS-2G field coils located in the rotating cryostat and cooled by liquid nitrogen. The simulation and optimization of HTS-2G field coils geometry allowed to increase feed DC current up to 50A. Copper stator windings are water cooled. Magnetic and electrical losses in 1 MW HTS-2G generator do not exceed 1.6% of the nominal output power. In the construction of HTS-2G generator the wave multiplier with ratio 1:40 is used. The latter allows to reduce the total mass of HTS-2G generator down to 1.5 tons. The small-scale model of HTS-2G generator with output power 50 kW was designed, manufactured and tested. The test results showed good agreement with calculation results. The manufacturing of 1 MW HTS-2G generator is planned in 2014. This work is done under support of Rosatom within the frames of Russian Project "Superconducting Industry".

  7. Comparison of 10 MW superconducting generator topologies for direct-drive wind turbines

    DEFF Research Database (Denmark)

    Liu, Dong; Polinder, Henk; Abrahamsen, Asger Bech

    2015-01-01

    Large wind turbines of 10 MW or higher power levels are desirable for reducing the cost of energy of offshore wind power conversion. Conventional wind generator systems will be costly if scaled up to 10 MW due to rather large size and weight. Direct drive superconducting generators have been...... magnetic field excitation allows for lightweight non-magnetic composite materials for machine cores instead of iron. A topology would probably not be a good option for an offshore wind turbine generator if it demands a far more expensive active material cost than others, even if it has other advantages...... proposed to address the problem with generator size, because the electrical machines with superconducting windings are capable of achieving a higher torque density of an electrical machine. However, the topology to be adopted for superconducting wind generators has not yet been settled, since the high...

  8. The Effect of Mounting Vortex Generators on the DTU 10MW Reference Wind Turbine Blade

    DEFF Research Database (Denmark)

    Skrzypinski, Witold Robert; Gaunaa, Mac; Bak, Christian

    2014-01-01

    The aim of the current work is to analyze possible advantages of mounting Vortex Generators (VG's) on a wind turbine blade. Specifically, the project aims at investigating at which radial sections of the DTU 10 MW Reference Wind Turbine blade it is most beneficial to mount the VG's in order...

  9. Design study of a 10 MW MgB2 superconductor direct drive wind turbine generator

    DEFF Research Database (Denmark)

    Abrahamsen, Asger Bech; Magnusson, Niklas; Liu, Dong

    2014-01-01

    A design study of a 10 MW direct drive wind turbine generator based on MgB2 superconducting wires is presented and the cost of the active materials of the generator is estimated to be between 226 €/kW and 84 €/kw, which is lower than the threshold values of 300 €/kW of the INNWIND.EU project. A n...

  10. Wellhead bowl protector and retrieving tool

    International Nuclear Information System (INIS)

    Young, J.A.

    1991-01-01

    This patent describes improvement in a wellhead protection system including a wear bushing and a retrieving tool. The improvement comprises a wear bushing supported within the wellhead, wherein the wear bushing includes an enlarged upper end having an external support shoulder for engagement with an internal support shoulder formed in the wellhead; wherein the wear bushing further includes an internal circumferential slot intersected by at least one vertically extending slot, the vertical slot extending from the circumferential slot to the upper end of the wear bushing; a retrieving tool having at least one outwardly biased, retractable lug member mounted thereon; and wherein the retrieving tool includes an enlarged portion adapted to be received within the enlarged upper end of the wear bushing. This patent also describes a method of retrieving a wear bushing from a wellhead comprising the steps of: lowering a retrieving tool into the wellhead for locking engagement with the wear bushing; aligning the retrieving tool with the wear bushing for automatically forcing lug members carried by the retrieving tool outwardly into locking engagement with the wear bushing; monitoring drill string weight for determining engagement of the retrieving tool with the wear bushing, wherein a substantial decrease in drill string weight is an indication that the retrieving tool is engaged with the wear bushing; and removing the wear bushing from the wellhead

  11. Short Circuits of a 10-MW High-Temperature Superconducting Wind Turbine Generator

    DEFF Research Database (Denmark)

    Song, Xiaowei (Andy); Liu, Dong; Polinder, Henk

    2017-01-01

    Direct Drive high-temperature superconducting (HTS) wind turbine generators have been proposed to tackle challenges for ever increasing wind turbine ratings. Due to smaller reactances in HTS generators, higher fault currents and larger transient torques could occur if sudden short circuits take...... place at generator terminals. In this paper, a finite element model that couples magnetic fields and the generator's equivalent circuits is developed to simulate short-circuit faults. Afterward, the model is used to study the transient performance of a 10-MW HTS wind turbine generator under four...... show that the short circuits pose great challenges to the generator, and careful consideration should be given to protect the generator. The findings presented in this paper would be beneficial to the design, operation and protection of an HTS wind turbine generator....

  12. Development of 70 MW class superconducting generator with quick-response excitation

    Science.gov (United States)

    Miyaike, Kiyoshi; Kitajima, Toshio; Ito, Tetsuo

    2002-03-01

    The development of a superconducting generator had been carried out for 12 years under the first stage of a Super GM project. The 70 MW class model machine with quick response excitation was manufactured and evaluated in the project. This type of superconducting generator improves power system stability against rapid load fluctuations at the power system faults. This model machine achieved all development targets including high stability during rapid excitation control. It was also connected to the actual 77 kV electrical power grid as a synchronous condenser and proved advantages and high-operation reliability of the superconducting generator.

  13. Optimization and comparison of superconducting generator topologies for a 10 MW wind turbine application

    DEFF Research Database (Denmark)

    Liu, Dong; Polinder, Henk; Abrahamsen, Asger Bech

    2017-01-01

    A direct-drive superconducting generator (DDSCG) is proposed for 10 MW wind turbines in the INNWIND.EU project. To fit the generator into the "king-pin" conceptual nacelle design, the generator structure with inner stationary superconducting (SC) field winding and outer rotating copper armature...... winding is investigated in the first research phase. Since the cost is an important performance indicator for this application, this paper presents a method to minimize the active material cost of the "king-pin" fitted DDSCG. In this method a relatively fast optimization program is developed with 2D non...

  14. A Pole Pair Segment of a 2 MW High Temperature Superconducting Wind Turbine Generator

    DEFF Research Database (Denmark)

    Song, Xiaowei (Andy); Mijatovic, Nenad; Kellers, Jürgen

    2016-01-01

    A 2 MW high temperature superconducting (HTS) generator with 24 pole pairs has been designed for the wind turbine application. In order to identify potential challenges and obtain practical knowledge prior to production, a fullsize stationary experimental set-up, which is one pole pair segment...... generator and the set-up in terms of the flux density, the operating condition of the HTS winding, and the force-generation capability. Finite element (FE) software MagNet is used to carry out numerical simulations. The findings show that the HTS winding in the set-up is a good surrogate...

  15. The ''controbloc'', a programmable automatic device for the 1,300 MW generation of power stations

    International Nuclear Information System (INIS)

    Pralus, B.; Winzelle, J.C.

    1983-01-01

    Technological progress in the field of microelectronics has led to the development of an automatic control device, the ''controbloc'', for operating and controlling nuclear power plants. The ''controbloc'' will be used in automatic systems with a high degree of safety and versatility and is now being installed in the first of the new generation 1,300 MW power stations. The main characteristics of the device and the evaluation tests which have been carried out are described [fr

  16. Control design and performance analysis of a 6 MW wind turbine-generator

    Science.gov (United States)

    Murdoch, A.; Winkelman, J. R.; Javid, S. H.; Barton, R. S.

    1983-01-01

    This paper discusses an approach to the modeling and performance for the preliminary design phase of a large (6.2 MW) horizontal axis wind turbine generator (WTG). Two control philosophies are presented, both of which are based on linearized models of the WT mechanical and electrical systems. The control designs are compared by showing the performance through detailed non-linear time simulation. The disturbances considered are wind gusts, and electrical faults near the WT terminals.

  17. Short Circuits of a 10 MW High Temperature Superconducting Wind Turbine Generator

    DEFF Research Database (Denmark)

    Song, Xiaowei (Andy); Liu, Dong; Polinder, Henk

    2016-01-01

    Direct drive high temperature superconducting (HTS) wind turbine generators have been proposed to tackle challenges for ever increasing wind turbine ratings. Due to smaller reactances in HTS generators, higher fault currents and larger transient torques could occur if sudden short circuits happen...... at generator terminals. In this paper, a finite element model that couples magnetic fields and the generator’s equivalent circuits is developed to simulate short circuit faults. Afterwards, the model is used to study the transient performance of a 10 MW HTS wind turbine generator under four different short...... that the short circuits pose great challenges to the generator, and careful consideration should be given to protect the generator. The results presented in this paper would be beneficial to the design, operation and protection of an HTS wind turbine generator....

  18. A Pole Pair Segment of a 2-MW High-Temperature Superconducting Wind Turbine Generator

    DEFF Research Database (Denmark)

    Song, Xiaowei (Andy); Mijatovic, Nenad; Kellers, Jürgen

    2017-01-01

    A 2-MW high-temperature superconducting (HTS) generator with 24 pole pairs has been designed for the wind turbine application. In order to identify potential challenges and obtain practical knowledge prior to production, a full-size stationary experimental setup, which is one pole pair segment...... and the setup in terms of the flux density, the operating condition of the HTS winding, and the force-generation capability. Finite element (FE) software MagNet is used to carry out numerical simulations. The findings show that the HTS winding in the setup is a good surrogate for these that would be used...

  19. Design of a 2.5MW(e) biomass gasification power generation module

    Energy Technology Data Exchange (ETDEWEB)

    McLellan, R.

    2000-07-01

    The purpose of this contract was to produce a detailed process and mechanical design of a gasification and gas clean up system for a 2.5MW(e) power generation module based on the generation of electrical power from a wood chip feed stock. The design is to enable the detailed economic evaluation of the process and to verify the technical performance data provided by the pilot plant programme. Detailed process and equipment design also assists in the speed at which the technology can be implemented into a demonstration project. (author)

  20. 12 MW

    DEFF Research Database (Denmark)

    Hasager, Charlotte Bay; Pena Diaz, Alfredo; Mikkelsen, Torben

    '12MW: final report' is for the project with the full title ‘12 MW wind turbines: the scientific basis for their operation at 70 to 270 m height offshore’ that had the goal to experimentally investigate the wind and turbulence characteristics between 70 and 270 m above sea level and thereby...... establish the scientific basis relevant for the next generation of huge 12 MW wind turbines operating offshore. The project started 1st October 2005 and ended 31st March 2009. Firstly was conducted a 6-month experiment at the Horns Rev offshore wind farm deploying a lidar and a sodar on the transformer...

  1. Recent R and D status for 70 MW class superconducting generators in the Super-GM project

    International Nuclear Information System (INIS)

    Ageta, T.

    2000-01-01

    Three types of 70 MW class superconducting generators called model machines have been developed to establish basic technologies for a pilot machine. The series of on-site verification tests was completed in June 1999. The world's highest generator output (79 MW), the world's longest continuous operation (1500 hours) and other excellent results were obtained. The model machine was connected to a commercial power grid and fundamental data were collected for future utilization. It is expected that fundamental technologies on design and manufacture required for a 200 MW class pilot machine are established. (author)

  2. Economic analysis of process steam and electricity generation by a 200 MW NHR

    International Nuclear Information System (INIS)

    Tian Li; Wang Yongqing

    2000-01-01

    New applications for low temperature nuclear heating reactors should be developed using economic analysis. This paper compares and analyzes the economics of the generation 1.5 MPa process steam and electricity by a 200 MW nuclear heating reactor (NHR-200) for industrial development. The project is very attractive economically with an internal rate of return of 19.61%, a net present worth (discount rate 10%) of 765 million yuan RMB and a capital recovery or payback period of about 5 years after construction is completed. Compared with only using the NHR-200 for in winter heating, the economic of process steam and electricity generation by NHR-200 are much better. In addition, the NHR-200 will significantly improve environmental pollution in cities and reduce the transport of coal from north to south in China

  3. Turbine-generators for 400 mw coal-fired power plants

    International Nuclear Information System (INIS)

    Engelke, W.; Bergmann, D.; Boer, J.; Termuehlen, H.

    1991-01-01

    This paper reports that presently, standard coal-fired power plant concepts including flue gas desulfurization (FGD) and DENO x systems are in the design stage to be built on relatively short delivery schedules. The rating in the 400 MW range has generally been selected, because such small power plant units with short delivery times cause a minimum financial burden during planning, delivery and installation. They also follow more closely the growth of electric energy demand at specific locations. However economical considerations could lead to larger unit ratings, since the planning and building process of higher capacity plants is not significantly different but specific plant costs are certainly smaller with increased unit size. Historically large tandem-compound steam turbine-generators have been built and have proven reliable operation with ratings in excess of 800 MW. Already in the late 1950's main steam pressures and temperatures as high as 4,500 psig and 1,200 degrees F respectively were successfully used for smaller steam turbines

  4. Generation of 99-mW continuous-wave 285-nm radiation for magneto-optical trapping of Mg atoms

    DEFF Research Database (Denmark)

    Madsen, Dorte Nørgaard; Yu, Ping; Balslev, Søren

    2002-01-01

    We have developed a tunable intense narrow-band 285 nm light source based on frequency doubling of 570 nm light in BBO. At input powers of 840 mW (including 130 mW used for locking purposes) we generate 99 mW UV radiation with an intensity profile suitable for laser-cooling experiments. The light...... is used for laser cooling of neutral magnesium atoms in a magneto-optical trap (MOT). We capture about 5 x 10(6) atoms directly from a thermal beam and find that the major loss mechanism of the magnesium MOT is a near-resonant two-photon ionization process....

  5. Full-load converter connected asynchronous generators for MW class wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Akhmatov, Vladislav

    2005-06-15

    Wind turbines equipped with full-load converter-connected asynchronous generators are a known concept. These have rating up to hundreds of kW and are a feasible concept for MW class wind turbines and may have advantages when compared to conventional wind turbines with directly connected generators. The concept requires the use of full-scale frequency converters, but the mechanical gearbox is smaller than in conventional wind turbines of the same rating. Application of smaller gearbox may reduce the no-load losses in the wind turbines, which is why such wind turbines with converter connected generators may start operation at a smaller wind speed. Wind turbines equipped with such converted connected asynchronous generators are pitch-controlled and variable-speed. This allows better performance and control. The converter control may be applied to support the grid voltage at short-circuit faults and to improve the fault-ride-through capability of the wind turbines, which makes the concepts relevant for large wind farms. The Danish transmission system operator Energinet-DK has implemented the general model of wind turbines equipped with converter connected asynchronous generators with the simulation tool Powerfactory (DlgSilent). The article presents Energinet-DK's experience of modeling this feasible wind turbine concept. (Author)

  6. Failure analysis to the weights of balance of a 350 MW turbo-generator; Analisis de falla a los pesos de balanceo de un turbogenerador de 350 MW

    Energy Technology Data Exchange (ETDEWEB)

    Vital Flores, Francisco; Gamero Arroyo, Jose Manuel [LAPEM, Comision Federal de Electricidad (Mexico)

    2007-11-15

    The selection of materials and the quality control in the supply of the components, as well as the involved operative variables in the process of work to which an equipment, device or a system of a power station of electrical generation are subjected, impact in the same in their useful life in a decisive way. In this document it is presented an analysis of a failure occurred in a 350 MW turbo-generator by the loosening of the balance weights, in which it is mentioned the flaws occurred by this cause and a metallographic analysis that indicates the main fault for the happening. [Spanish] La seleccion de material y el control de calidad en los suministros de los componentes, asi como las variables operativas involucradas en el proceso de trabajo al cual es sometido un equipo, dispositivo o un sistema de una central de generacion electrica, impactan en los mismos de manera decisiva en su vida util. En este documento se presenta un analisis de falla ocurrido en un turbogenerador de 350 MW, por el desprendimiento de los pesos de balanceo, el cual se menciona de los desperfectos ocurridos por esta causa y un analisis metalografico que indica la falla principal por lo ocurrido.

  7. GASCAP: Wellhead Gas Productive Capacity Model documentation, June 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The Wellhead Gas Productive Capacity Model (GASCAP) has been developed by EIA to provide a historical analysis of the monthly productive capacity of natural gas at the wellhead and a projection of monthly capacity for 2 years into the future. The impact of drilling, oil and gas price assumptions, and demand on gas productive capacity are examined. Both gas-well gas and oil-well gas are included. Oil-well gas productive capacity is estimated separately and then combined with the gas-well gas productive capacity. This documentation report provides a general overview of the GASCAP Model, describes the underlying data base, provides technical descriptions of the component models, diagrams the system and subsystem flow, describes the equations, and provides definitions and sources of all variables used in the system. This documentation report is provided to enable users of EIA projections generated by GASCAP to understand the underlying procedures used and to replicate the models and solutions. This report should be of particular interest to those in the Congress, Federal and State agencies, industry, and the academic community, who are concerned with the future availability of natural gas

  8. Comparison of Levelized Cost of Energy of superconducting direct drive generators for a 10 MW offshore wind turbine

    DEFF Research Database (Denmark)

    Abrahamsen, Asger Bech; Liu, Dong; Magnusson, Niklas

    2018-01-01

    A method for comparing the Levelized Cost of Energy (LCoE) of different superconducting drive trains is introduced. The properties of a 10 MW MgB$_{2}$ superconducting direct drive generator are presented in terms weight scaled to a turbine with a rotor diameter up of 280 m and the cost break down...

  9. New regulations foster wellhead protection efforts

    International Nuclear Information System (INIS)

    Lennox, J.

    1993-01-01

    Groundwater contamination can have disastrous consequences: closed wellfields, insufficient temporary water supplies, and costly, prolonged clean-up. Realizing that it is more prudent to protect water wells than to wait for contamination to occur, many states are issuing regulations designed to protect the surface and subsurface areas surrounding public water system wells. The states have been prompted in part by the federal Safe Drinking Water Act Amendments of 1986, which provide grants and technical guidance to state wellhead protection programs. The Act does not impose regulations itself, but leaves it to the states to create and manage protection programs. Accordingly, regulations may differ dramatically from state to state, reflecting distinct hydrogeology and land uses. In every program, however, the starting point is the determination of wellhead protection areas. The protection area can range from a few hundred feet to several miles from a well. The characteristics of the aquifers surrounding the well and the amount of pumping are factors in delineating the protected area's boundaries. This article examines methods for determining the protection area

  10. A 20 MW{sub t} pilot plant for the generation of electric power by magnetohydrodynamic process using biomass; Planta piloto de 20 MW{sub t} de geracao de energia eletrica por magnetohidrodinamica a partir da biomassa

    Energy Technology Data Exchange (ETDEWEB)

    Pinatti, D G; Guimaraes, O L.C.; Silva, A C da; Batista, J F [Fundacao de Tecnologia Industrial (FTI), Lorena, SP (Brazil); Fernandes Filho, G E.F.; Magalhaes Filho, P [UNESP, Guaratingueta, SP (Brazil). Faculdade de Engenharia

    1991-12-31

    The combustion of celulignin from biomass with addition of 1% of K, generates a plasma with electric conductivity of 100 S/M. This allows the establishment of a small size thermoelectric plants in triple or double cycle with magnetohydrodynamic generator (MHD), gas turbine and steam turbine. It is presented calculations of a pilot plant of 20 MW{sub t} in the MHD circuit and a total of 30 MW{sub t} with net efficiency of 27%. For plants larger than 60 MW{sub t} it is expected net efficiency larger than 37%. 3 refs., 10 figs., 3 tabs

  11. 30 CFR 250.617 - Tubing and wellhead equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Tubing and wellhead equipment. 250.617 Section... Tubing and wellhead equipment. The lessee shall comply with the following requirements during well-workover operations with the tree removed: (a) No tubing string shall be placed in service or continue to...

  12. 30 CFR 250.517 - Tubing and wellhead equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Tubing and wellhead equipment. 250.517 Section... Tubing and wellhead equipment. (a) No tubing string shall be placed in service or continue to be used unless such tubing string has the necessary strength and pressure integrity and is otherwise suitable for...

  13. 30 CFR 250.1626 - Tubing and wellhead equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Tubing and wellhead equipment. 250.1626 Section... GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Sulphur Operations § 250.1626 Tubing and wellhead equipment. (a) No tubing string shall be placed into service or continue to be used unless such...

  14. Ripple Field AC Losses in 10-MW Wind Turbine Generators With a MgB2 Superconducting Field Winding

    DEFF Research Database (Denmark)

    Liu, Dong; Polinder, Henk; Magnusson, Niklas

    2016-01-01

    Superconducting (SC) synchronous generators are proposed as a promising candidate for 10-20-MW direct-drive wind turbines because they can have low weights and small sizes. A common way of designing an SC machine is to use SC wires with high current-carrying capability in the dc field winding...... and the ac armature winding is made with copper conductors. In such generators, the dc field winding is exposed to ac magnetic field ripples due to space harmonics from the armature. In generator design phases, the ac loss caused by these ripple fields needs to be evaluated to avoid local overheating...... and an excessive cooling budget. To determine the applicability of different design solutions in terms of ac losses, this paper estimates the ac loss level of 10-MW wind generator designs employing a MgB2 SC field winding. The effects on ac losses are compared between nonmagnetic and ferromagnetic teeth...

  15. Topology Comparison of Superconducting Generators for 10-MW Direct-Drive Wind Turbines: Cost of Energy Based

    DEFF Research Database (Denmark)

    Liu, Dong; Polinder, Henk; Abrahamsen, Asger Bech

    2017-01-01

    This paper aims at finding feasible electromagnetic designs of superconducting synchronous generators (SCSGs) for a 10-MW direct-drive wind turbine. Since a lower levelized cost of energy (LCoE) increases the feasibility of SCSGs in this application, 12 generator topologies are compared regarding...... their LCoE in a simplified form of levelized equipment cost of energy (LCoE$_{\\text{eq}}$). MgB$_2$ wires are employed in the field winding. Based on the current unit cost and critical current density capability of the MgB $_2$ wire at 20 K, the topologies with more iron have a much lower LCo...

  16. Update on the enhancement of Florida power and light 400 MW steam generator program

    International Nuclear Information System (INIS)

    Mazzarell, G.R.; Chang, P.S.

    1991-01-01

    Florida Power and Light has nine (9) 400 MW units, designed and installed by Foster Wheeler in the 1960's. These fossil units were designed as base loaded units with oil firing. However, natural gas capability was added and for more than seven years these units have been in a cycling mode of operation. The availability of these units has deteriorated over the same time period. This paper reports that Florida Power and Light instituted an enhancement program for improving the availability redundancy of all their fossil fired units. The 400 MW units were the main contributors to the system forced outage rate. Each design and operating problem of these units was studied in detail and the root causes of each problem were identified. The first two (2) units, Port Everglades units No. 3 and 4 have been modified and returned to service. Testing of these two (2) units with respect to performance guarantees and the effectiveness of each of the individual modifications, has been completed. The first unit modified, PPE No. 3 was returned to service May 1989, PPE No. 4 in May of 1990. Both units have performed satisfactorily during subsequent operation. Cape Canaveral Unit No. 2 is modified and scheduled to be returned to service in May 1991

  17. Impact of protection settings of the distributed generation frequency under 1MW in the national electric system

    International Nuclear Information System (INIS)

    Alpizar Chavarria, Oscar

    2013-01-01

    A literature review is conducted to understand the distributed generation, the reason for the introduction into modern power systems and other distributed generation technologies based on renewable energies that have been installed around the country. The frequency protections of distributed generation equipment under 1MW are studied according to international standards like IEEE-1547 and specifications of equipment manufacturers. The influence of the recommended international standards settings are investigated for systems of distributed generation, the performance in frequency that have presented under some frequency perturbation, as well as the influence that can have on the national and regional electrical system, with different amounts of technologies included in the national system. The recommended settings are evaluated through simulations in PSSE program in the context of the behavior of the frequency in the national electric system [es

  18. A miniaturized mW thermoelectric generator for nw objectives: continuous, autonomous, reliable power for decades.

    Energy Technology Data Exchange (ETDEWEB)

    Aselage, Terrence Lee; Siegal, Michael P.; Whalen, Scott; Frederick, Scott K.; Apblett, Christopher Alan; Moorman, Matthew Wallace

    2006-10-01

    We have built and tested a miniaturized, thermoelectric power source that can provide in excess of 450 {micro}W of power in a system size of 4.3cc, for a power density of 107 {micro}W/cc, which is denser than any system of this size previously reported. The system operates on 150mW of thermal input, which for this system was simulated with a resistive heater, but in application would be provided by a 0.4g source of {sup 238}Pu located at the center of the device. Output power from this device, while optimized for efficiency, was not optimized for form of the power output, and so the maximum power was delivered at only 41mV. An upconverter to 2.7V was developed concurrently with the power source to bring the voltage up to a usable level for microelectronics.

  19. Comparison of MgB2 and Coated Conductor Based 5 MW Superconducting Wind Turbine Generator

    DEFF Research Database (Denmark)

    Abrahamsen, Asger Bech; Jensen, Bogi Bech

    2012-01-01

    conductors, but the operation temperature in range of T = 15-20 K and the engineering current density Je is smaller. We have found that a 16 pole synchronous generator with active diameter D = 4.2 m and length L = 1.5 m based on a MgB2 wire with Je = 70 A/mm2 in approximately 4 Tesla field would result...... in a wire usage in the order of 330 km. This has the potential to decrease the price of the superconductor wires in the generator by a factor of 10 compared to the coated conductors, but the cryogenics will be a challenge and is discussed. Finally we will use turbine load simulations to discuss the torque...... events that such a 5 MW generator would experience if installed in the NREL turbine....

  20. Wellhead deliverabilty of natural gas - assembling the evidence. Final report

    International Nuclear Information System (INIS)

    Hughes, W.R.

    1995-09-01

    This report presents information about the wellhead delivery of natural gas--the amount of gas the supply industry can produce and deliver to the pipeline. It is designed to help power industry planners evaluate essential aspects of gas supply as part of their overall assessment and utilization of gas-fired power generation. Low prices caused by excess deliverability have led to minimal exploration for new supplies, with the open-quotes bubbleclose quotes of excess deliverability ending. The report examines the facts pertinent to assessing the outlook for deliverability over the intermediate term. It develops deliverability concepts and relates deliverability to reserves and resources. It assesses the available information for measuring and monitoring availability and suggests improvements in available data. The regional outlook for deliverability growth in the Gulf of Mexico and other leading producing regions is also discussed. The report reviews the historical background of present deliverability trends and discusses the industry dynamics that affect development of future deliverability: lead times for increasing deliverability, the declining base of skilled exploration manpower, advancing gas supply technology, and prices required to encourage exploration and development

  1. Increasing the Feasibility of Superconducting Generators for 10 MW Direct-Drive Wind Turbines

    NARCIS (Netherlands)

    Liu, D.

    2017-01-01

    In recent years, superconducting synchronous generators (SCSGs) have been proposed as an alternative to permanent magnet synchronous generators (PMSGs). They are expected to reduce the top head mass and the nacelle size for such large wind turbines. In 2012, the INNWIND.EU project initiated this

  2. Short Circuits of a 10 MW High Temperature Superconducting Wind Turbine Generator

    NARCIS (Netherlands)

    Song, X.; Polinder, H.; Liu, D.; Mijatovic, Nenad; Holbøll, Joachim; Jensen, Bogi Bech

    Direct drive high temperature superconducting (HTS) wind turbine generators have been proposed to tackle challenges for ever increasing wind turbine ratings. Due to smaller reactances in HTS generators, higher fault currents and larger transient torques could occur if sudden short circuits happen at

  3. A comparative investigation of three PM-less MW power range wind generator topologies

    DEFF Research Database (Denmark)

    Bratiloveanu, Catalin-Rauti; Traian Cosmin Anghelus, Dumitru; Boldea, I.

    2012-01-01

    As the wind energy penetration range increases steadily and the high energy PM costs are rising dramatically, PM-less large power wind generators with high performance are needed. Apart from extending the range of cage rotor induction generators, doubly-fed induction generators and dc excited...... investigates by quasi 2D-FEM two dc stator polarized (to increase machine side PWM converter voltage utilization, that is to reduce peak kVA ratings and costs of the machine side PWM converter) directly-driven switched reluctance generators (one with circumferential field and one with transverse flux (with...... heteropolar-rotor (standard) synchronous generators, especially for direct drives (very low speed) and multibrid (with single stage transmission (5/1-8/1 ratio)), new topologies have to be investigated to reduce initial costs and weights for high enough efficiency and energy annual yield. The present paper...

  4. External gamma radiation survey for oil wellheads in Saudi Arabia

    International Nuclear Information System (INIS)

    Nassar, Rafat M.; Mously, Khalid A.; Cowie, Michael I.

    2008-01-01

    Naturally occurring radioactive material (NORM) is known to be associated with oil and gas extraction. As part of a comprehensive NORM management strategy, Saudi Aramco needed to determine the extent of NORM contamination associated with their oil and gas operations. As part of that strategy, this study focused on external gamma survey of oil producing wellheads at various locations. The study aimed to: 1-) Identify wellheads with elevated gamma radiation dose rate; 2-) Specify the exact locations of the high dose rates on the wellheads; 3-) Identify the radioisotopes responsible for the high dose rates; and 4-) Propose worker protection requirements during maintenance. The majority (∼92%) of the surveyed wellheads showed no enhanced gamma dose-rate above background level. From the remaining ∼8%, only a few wellheads showed dose rates between 1,000-3,700 n Sv/h. The study revealed that NORM contamination tends to accumulate at turns of the pipes, around pipe diameter changes, the joints, the back of valves, and at the base of the wellhead. Also, for a given location, NORM build up on the interior of pipework varies over time and continues to migrate down stream until it reaches the Gas and Oil Separation Plants (GOSP). There NORM is expected to accumulate and reside in the form of sludge. Gamma spectroscopy analysis revealed that 226 Ra and its progeny are responsible for the high radiation dose rates detected. It was concluded that NORM will not pose significant radiation hazards to workers as long as the tubing and piping are not opened. (author)

  5. Heat loss analysis-based design of a 12 MW wind power generator module having an HTS flux pump exciter

    International Nuclear Information System (INIS)

    Sung, Hae-Jin; Go, Byeong-Soo; Jiang, Zhenan; Park, Minwon; Yu, In-Keun

    2016-01-01

    Highlights: • A large-scale HTS generator module has been suggested to avoid issues such as a huge vacuum vessel and higher reliability. • The challenging heat loss analysis of a large-scale HTS generator has successfully been performed, enabling the design of an optimal support structure having a total heat loss of 43 W/400 kW. • The results prove the potential of a large-scale superconducting wind-power generator to operate efficiently, and support further development of the concept. - Abstract: The development of an effective high-temperature superconducting (HTS) generator is currently a research focus; however, the reduction of heat loss of a large-scale HTS generator is a challenge. This study deals with a heat loss analysis-based design of a 12 MW wind power generator module having an HTS flux pump exciter. The generator module consists of an HTS rotor of the generator and an HTS flux pump exciter. The specifications of the module were described, and the detailed configuration of the module was illustrated. For the heat loss analysis of the module, the excitation loss of the flux pump exciter, eddy current loss of all of the structures in the module, radiation loss, and conduction loss of an HTS coil supporter were assessed using a 3D finite elements method program. In the case of the conduction loss, different types of the supporters were compared to find out the supporter of the lowest conduction loss in the module. The heat loss analysis results of the module were reflected in the design of the generator module and discussed in detail. The results will be applied to the design of large-scale superconducting generators for wind turbines including a cooling system.

  6. Heat loss analysis-based design of a 12 MW wind power generator module having an HTS flux pump exciter

    Energy Technology Data Exchange (ETDEWEB)

    Sung, Hae-Jin, E-mail: haejin0216@gmail.com [Changwon National University, 20 Changwondaehak-ro, Changwon, 641-773 (Korea, Republic of); Go, Byeong-Soo [Changwon National University, 20 Changwondaehak-ro, Changwon, 641-773 (Korea, Republic of); Jiang, Zhenan [Robinson Research Institute, Victoria University of Wellington, PO Box 33436 (New Zealand); Park, Minwon [Changwon National University, 20 Changwondaehak-ro, Changwon, 641-773 (Korea, Republic of); Yu, In-Keun, E-mail: yuik@changwon.ac.kr [Changwon National University, 20 Changwondaehak-ro, Changwon, 641-773 (Korea, Republic of)

    2016-11-15

    Highlights: • A large-scale HTS generator module has been suggested to avoid issues such as a huge vacuum vessel and higher reliability. • The challenging heat loss analysis of a large-scale HTS generator has successfully been performed, enabling the design of an optimal support structure having a total heat loss of 43 W/400 kW. • The results prove the potential of a large-scale superconducting wind-power generator to operate efficiently, and support further development of the concept. - Abstract: The development of an effective high-temperature superconducting (HTS) generator is currently a research focus; however, the reduction of heat loss of a large-scale HTS generator is a challenge. This study deals with a heat loss analysis-based design of a 12 MW wind power generator module having an HTS flux pump exciter. The generator module consists of an HTS rotor of the generator and an HTS flux pump exciter. The specifications of the module were described, and the detailed configuration of the module was illustrated. For the heat loss analysis of the module, the excitation loss of the flux pump exciter, eddy current loss of all of the structures in the module, radiation loss, and conduction loss of an HTS coil supporter were assessed using a 3D finite elements method program. In the case of the conduction loss, different types of the supporters were compared to find out the supporter of the lowest conduction loss in the module. The heat loss analysis results of the module were reflected in the design of the generator module and discussed in detail. The results will be applied to the design of large-scale superconducting generators for wind turbines including a cooling system.

  7. Status of the Southern California Edison Company 3 MW Wind Turbine Generator (WTG) demonstration project

    Science.gov (United States)

    Scheffler, R. L.

    1979-01-01

    To demonstrate the concept of utility scale electricity production from a high wind energy resource, a program was initiated to construct and test a 3 megawatt (3,000 kW) Schachle wind turbine generator near Palm Springs, California. The background and current status of this program are presented along with a summary of future planned program activities.

  8. Manufacture of the 300 MW steam generator and pressure stabilizer for Qinshan Nuclear Power Station

    International Nuclear Information System (INIS)

    Qian Yi; Miao Deming.

    1989-01-01

    A brief description of the manufacturing process of the steam generator and pressure stabilizer for 300 MWe Qinshan Nuclear Power Station in Shanghai Boiler Works is presented, with special emphasis on fabrication facilities, test procedures and technological evaluations during the manufaturing process-imcluding deep driling of tubesheets, welding of tubes to tube-sheets and tube rolling tests

  9. Effects of Armature Winding Segmentation with Multiple Converters on the Short Circuit Torque of 10-MW Superconducting Wind Turbine Generators

    DEFF Research Database (Denmark)

    Liu, Dong; Polinder, Henk; Abrahamsen, Asger Bech

    2017-01-01

    Superconducting synchronous generators (SCSGs) are drawing more attention in large direct-drive wind turbine applications. Despite low weight and compactness, the short circuit torque of an SCSG may be too high for wind turbine constructions due to a large magnetic air gap of an SCSG. This paper...... aims at assessing the effects of armature winding segmentation on reducing the short circuit torque of 10-MW SCSGs. A concept of armature winding segmentation with multiple power electronic converters is presented. Four SCSG designs using different topologies are examined. Results show that armature...... winding segmentation effectively reduce the short circuit torque in all the four SCSG designs when one segment is shorted at the terminal....

  10. A 2MW 6-phase BLDC Generator Developed from a PM Synchronous Generator for Wind Energy Application

    DEFF Research Database (Denmark)

    Chen, Zhuihui; Chen, Zhe; Liu, Xiao

    2014-01-01

    rectifier is adopted. The cases the with different loads are studied. The finite element simulation shows the developed BLDC generator is better than the PMSM generator in terms of DC voltage ripple and torque ripple. Furthermore, the volume of the BLDC generator is smaller, despite of more permanent magnet......In the direct drive wind turbine application, a PMSM generator often works together with a diode rectifier, which connects to a boost converter. In this paper, a six-phase BLDC generator is developed from the prototype design of three-phase permanent magnet synchronous generator. The diode...... is required. The efficiencies and the costs are also compared. As the result shows, BLDC generators connected with the diode rectifiers are good candidates for direct drive wind turbines....

  11. Structural Mass Saving Potential of a 5-MW Direct-Drive Generator Designed for Additive Manufacturing

    Energy Technology Data Exchange (ETDEWEB)

    Sethuraman, Latha [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Fingersh, Lee J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Dykes, Katherine L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hayes, Austin [Rochester Institute of Technology

    2017-11-09

    As wind turbine blade diameters and tower height increase to capture more energy in the wind, higher structural loads results in more structural support material increasing the cost of scaling. Weight reductions in the generator transfer to overall cost savings of the system. Additive manufacturing facilitates a design-for-functionality approach, thereby removing traditional manufacturing constraints and labor costs. The most feasible additive manufacturing technology identified for large, direct-drive generators in this study is powder-binder jetting of a sand cast mold. A parametric finite element analysis optimization study is performed, optimizing for mass and deformation. Also, topology optimization is employed for each parameter-optimized design.The optimized U-beam spoked web design results in a 24 percent reduction in structural mass of the rotor and 60 percent reduction in radial deflection.

  12. Emergency diesel generating sets for the 900 MW PWR units operation and maintenance policy

    International Nuclear Information System (INIS)

    Guillon, A.; Lallier, M.

    1986-01-01

    In order to improve the reliability of the emergency diesel generating EDF has taken steps to ensure that: - sets are only started up when they are really needed, in order to reduce the thermal cycles and the mechanical stresses associated with start-up. - the maintenance policy is adapted to the conditions of use, by including the notion of a start-up being equivalent to a predetermined number of hours of operation. (authors)

  13. Emergency diesel generating sets for the 900 MW PWR units operation and maintenance policy

    Energy Technology Data Exchange (ETDEWEB)

    Guillon, A.; Lallier, M. [Electricite de France - EDF, Service de la Production Thermique, 3 rue de Messine, 75384 Paris Cedex 08 (France)

    1986-02-15

    In order to improve the reliability of the emergency diesel generating EDF has taken steps to ensure that: - sets are only started up when they are really needed, in order to reduce the thermal cycles and the mechanical stresses associated with start-up. - the maintenance policy is adapted to the conditions of use, by including the notion of a start-up being equivalent to a predetermined number of hours of operation. (authors)

  14. Control system design for the MOD-5A 7.3 mW wind turbine generator

    Science.gov (United States)

    Barton, Robert S.; Hosp, Theodore J.; Schanzenbach, George P.

    1995-01-01

    This paper provides descriptions of the requirements analysis, hardware development and software development phases of the Control System design for the MOD-5A 7.3 mW Wind Turbine Generator. The system, designed by General Electric Company, Advanced Energy Programs Department, under contract DEN 3-153 with NASA Lewis Research Center and DOE, provides real time regulation of rotor speed by control of both generator torque and rotor torque. A variable speed generator system is used to provide both airgap torque control and reactive power control. The wind rotor is designed with segmented ailerons which are positioned to control blade torque. The central component of the control system, selected early in the design process, is a programmable controller used for sequencing, alarm monitoring, communication, and real time control. Development of requirements for use of aileron controlled blades and a variable speed generator required an analytical simulation that combined drivetrain, tower and blade elastic modes with wind disturbances and control behavior. An orderly two phase plan was used for controller software development. A microcomputer based turbine simulator was used to facilitate hardware and software integration and test.

  15. Development of the 7.3 MW MOD-5A wind-turbine generator system

    Science.gov (United States)

    Barton, R. S.; Lucas, W. C.

    1983-12-01

    The General Electric Company Advanced Energy Programs Department is designing, under DOE/NASA sponsorship through Contract DEN 3-153, the MOD-5A wind-turbine system, which must generate electricity for less than 3.75 cents/kWh (1980 dollars). During the conceptual and preliminary design phases, the basic features were established as a result of tradeoff and optimization studies driven by minimizing the system cost of energy. During the past year, the program has been in the final design phase, and a reassessment to minimize risk has received strong emphasis in the design process. The program has progressed to the point that an agreement of sale has been reached for the first unit.

  16. Frictional melt generated by the 2008 Mw 7.9 Wenchuan earthquake and its faulting mechanisms

    Science.gov (United States)

    Wang, H.; Li, H.; Si, J.; Sun, Z.; Zhang, L.; He, X.

    2017-12-01

    Fault-related pseudotachylytes are considered as fossil earthquakes, conveying significant information that provide improved insight into fault behaviors and their mechanical properties. The WFSD project was carried out right after the 2008 Wenchuan earthquake, detailed research was conducted in the drilling cores. 2 mm rigid black layer with fresh slickenlines was observed at 732.6 m in WFSD-1 cores drilled at the southern Yingxiu-Beichuan fault (YBF). Evidence of optical microscopy, FESEM and FIB-TEM show it's frictional melt (pseudotachylyte). In the northern part of YBF, 4 mm fresh melt was found at 1084 m with similar structures in WFSD-4S cores. The melts contain numerous microcracks. Considering that (1) the highly unstable property of the frictional melt (easily be altered or devitrified) under geological conditions; (2) the unfilled microcracks; (3) fresh slickenlines and (4) recent large earthquake in this area, we believe that 2-4 mm melt was produced by the 2008 Wenchuan earthquake. This is the first report of fresh pseudotachylyte with slickenlines in natural fault that generated by modern earthquake. Geochemical analyses show that fault rocks at 732.6 m are enriched in CaO, Fe2O3, FeO, H2O+ and LOI, whereas depleted in SiO2. XRF results show that Ca and Fe are enriched obviously in the 2.5 cm fine-grained fault rocks and Ba enriched in the slip surface. The melt has a higher magnetic susceptibility value, which may due to neoformed magnetite and metallic iron formed in fault frictional melt. Frictional melt visible in both southern and northern part of YBF reveals that frictional melt lubrication played a major role in the Wenchuan earthquake. Instead of vesicles and microlites, numerous randomly oriented microcracks in the melt, exhibiting a quenching texture. The quenching texture suggests the frictional melt was generated under rapid heat-dissipation condition, implying vigorous fluid circulation during the earthquake. We surmise that during

  17. Conceptual design of the 6 MW Mod-5A wind turbine generator

    Science.gov (United States)

    Barton, R. S.; Lucas, W. C.

    1982-01-01

    The General Electric Company, Advanced Energy Programs Department, is designing under DOE/NASA sponsorship the MOD-5A wind turbine system which must generate electricity for 3.75 cent/KWH (1980) or less. During the Conceptual Design Phase, completed in March, 1981, the MOD-5A WTG system size and features were established as a result of tradeoff and optimization studies driven by minimizing the system cost of energy (COE). This led to a 400' rotor diameter size. The MOD-5A system which resulted is defined in this paper along with the operational and environmental factors that drive various portions of the design. Development of weight and cost estimating relationships (WCER's) and their use in optimizing the MOD-5A are discussed. The results of major tradeoff studies are also presented. Subsystem COE contributions for the 100th unit are shown along with the method of computation. Detailed descriptions of the major subsystems are given, in order that the results of the various trade and optimization studies can be more readily visualized.

  18. 3D electromagnetic design and electrical characteristics analysis of a 10-MW-class hightemperature superconducting synchronous generator for wind power

    International Nuclear Information System (INIS)

    Kim, J. H.; Park, S. I.; Le, T. D.; Kim, H. M.

    2014-01-01

    In this paper, the general electromagnetic design process of a 10-MW-class high-temperature superconducting (HTS) synchronous generator that is intended to be utilized for large scale offshore wind generator is discussed. This paper presents three-dimensional (3D) electromagnetic design proposal and electrical characteristic analysis results of a 10-MW-class HTS synchronous generator for wind power. For more detailed design by reducing the errors of a two-dimensional (2D) design owing to leakage flux in air-gap, we redesign and analyze the 2D conceptual electromagnetic design model of the HTS synchronous generator using 3D finite element analysis (FEA) software. Then electrical characteristics which include the no-load and full-load voltage of generator, harmonic contents of these two load conditions, voltage regulation and losses of generator are analyzed by commercial 3D FEA software.

  19. Optimization of Wellhead Piping Design for Production Wells at Development of Steam-Water Geothermal Fields

    Directory of Open Access Journals (Sweden)

    A.N. Shulyupin

    2017-03-01

    Full Text Available At present, the exploitation of geothermal resources develops in a fair competition with other types of energy resources. This leads to actuality of questions which associated with the more efficient use of existing wells, because cost of their drilling is a significant share of geothermal projects. In domestic practice of development of geothermal resources the steam-water wells have greatest energy potential. One way to improve the performance of these wells is a providing of smooth change of direction of motion of steam-water mixture from the vertical, in the well, to the horizontal, in steam gathering system. Typical wellhead piping of domestic steam-water wells involves the removal of the mixture through a cross bar at a right angle. Cross bar can generate considerable pressure loss that increases the operating pressure at the mouth of the well and reduces flow rate. It seems reasonable to substitute the typical cross bar by smooth pipe bend. This reduces wellhead resistance coefficient by more than on 2. Increase of curvature radius of pipe bend reduces the pressure loss to a local resistance but increases the friction pressure loss. There is an optimal curvature radius of pipe bend for minimum pressure loss in view of a local resistance and friction in the pipe bend. Calculations have shown that the optimum value for the radius of curvature is found in the range from 1.4 to 4.5 tube internal diameters. However, for technological reasons it is recommended to choose the radius of curvature from 1.4 to 2.4 diameters. Mounting of smooth pipe bend on the wellhead can provide significant economic benefits. For Mutnovka field (Kamchatka, this effect is estimated at 17.5 million rubles in year.

  20. Simulating the effect of hydrate dissociation on wellhead stability during oil and gas development in deepwater

    Science.gov (United States)

    Li, Qingchao; Cheng, Yuanfang; Zhang, Huaiwen; Yan, Chuanliang; Liu, Yuwen

    2018-02-01

    It is well known that methane hydrate has been identified as an alternative resource due to its massive reserves and clean property. However, hydrate dissociation during oil and gas development (OGD) process in deep water can affect the stability of subsea equipment and formation. Currently, there is a serious lack of studies over quantitative assessment on the effects of hydrate dissociation on wellhead stability. In order to solve this problem, ABAQUS finite element software was used to develop a model and to evaluate the behavior of wellhead caused by hydrate dissociation. The factors that affect the wellhead stability include dissociation range, depth of hydrate formation and mechanical properties of dissociated hydrate region. Based on these, series of simulations were carried out to determine the wellhead displacement. The results revealed that, continuous dissociation of hydrate in homogeneous and isotropic formations can causes the non-linear increment in vertical displacement of wellhead. The displacement of wellhead showed good agreement with the settlement of overlying formations under the same conditions. In addition, the shallower and thicker hydrate formation can aggravate the influence of hydrate dissociation on the wellhead stability. Further, it was observed that with the declining elastic modulus and Poisson's ratio, the wellhead displacement increases. Hence, these findings not only confirm the effect of hydrate dissociation on the wellhead stability, but also lend support to the actions, such as cooling the drilling fluid, which can reduce the hydrate dissociation range and further make deepwater operations safer and more efficient.

  1. Wellhead gas compression extends life of beam-pumped wells

    International Nuclear Information System (INIS)

    Sherry, M.J.; Fairchild, P.W.

    1992-01-01

    This paper reports that operators of marginal oil and gas wells often can avoid having to shut them in by compressing gas from the back side of the casing at the well head and delivering it into the flowline. This process can reduce the back pressure at the face of the producing formation, which allows additional oil and gas to be produced and extends the economical reserves. Small, low-horsepower stationary compressors or a walking beam compressor (WBC) may be used for this purpose. A portable compressor test unit recently has been employed to evaluate wells that are possible candidates for wellhead compression as another cost cutting measure

  2. Comparison and assessment of electricity generation capacity for different types of PV solar plants of 1MW in Soko banja, Serbia

    OpenAIRE

    Pavlović Tomislav M.; Milosavljević Dragana D.; Radivojević Aleksandar R.; Pavlović Mila A.

    2011-01-01

    This paper gives the results of the electricity generated by the fixed, one-axis and dual-axis tracking PV solar plant of 1 MW with flat PV panels made of monocrystalline silicon which is to be built in the area of Soko banja (spa in Serbia). Further on follows a description of the functioning of the fixed and one-axis and dual-axis tracking PV solar plant. For the calculation of the electricity generated by these plants PVGIS program from the Internet was used. Calculations have shown ...

  3. Preliminary design study of removable integral steam generator units of the multiple helically wound tube type for a 1250 MW(th) H.T.G.C. reactor

    International Nuclear Information System (INIS)

    Gilli, P.V.; Fritz, K.; Lippitsch, J.; Sandri, A.H.; Weiss, B.

    1965-11-01

    The possibilities of designing a multiple steam generator for a 1250 MW(th) High Temperature Gas-Cooled Reactor, consisting of 18 units which are able to pass through 5 ft diam. holes in the integral prestressed concrete pressure vessel are investigated. A lay-out and design with bundles of multi-start helical tubes is evolved, particular attention being paid to the questions of tube blanking and removal of the unit, and of selection of materials for superheater and reheater tubes. Thermal and stress calculations have been carried out, using the Waagner-Biro Computer Code ADURHELIX. (author)

  4. Comparison and assessment of electricity generation capacity for different types of PV solar plants of 1MW in Soko banja, Serbia

    Directory of Open Access Journals (Sweden)

    Pavlović Tomislav M.

    2011-01-01

    Full Text Available This paper gives the results of the electricity generated by the fixed, one-axis and dual-axis tracking PV solar plant of 1 MW with flat PV panels made of monocrystalline silicon which is to be built in the area of Soko banja (spa in Serbia. Further on follows a description of the functioning of the fixed and one-axis and dual-axis tracking PV solar plant. For the calculation of the electricity generated by these plants PVGIS program from the Internet was used. Calculations have shown that fixed PV solar plant power of 1 MW, solar modules of monocrystalline silicon yield 1130000 kWh power output, one-axis tracking PV solar plant yields 1420000 kWh, and dual-axis tracking PV solar plant yields 1450000 kWh of electricity. Electricity generated by the fixed PV solar plant could satisfy 86% of the annual needs for the electricity of the „Zdravljak“ hotel and the special „Novi stacionar“ hospital in Soko banja.

  5. An evaluation of alternative stator lamination materials for a high-speed, 1.5 MW, permanent magnet generator

    NARCIS (Netherlands)

    Paulides, J.J.H.; Jewell, G.W.; Howe, D.

    2004-01-01

    The influence of the choice of stator lamination material on the iron loss in a high speed, high power permanent magnet generator, which is interfaced to a DC link via a simple bridge rectifier, is investigated. The rating of the generator is representative of machines which would be employed in

  6. Qualification of the testing process by a new rotating probe for the 900 MW PWR steam generators tubes

    International Nuclear Information System (INIS)

    Caston, D.

    2001-01-01

    In 1997, EDF invites bids for the development of eddy current probes, in order to better control the steam generator tubes rolling zone of the PWR. After examination of the response, EDF accepted a prototype of a rotating probe. The EDF specifications of the new steam generators contract, fix the inspection performance and rhythm of the rotating probe, which implements two different technic: the STL (long rotating prob)e for the detection and characterization of longitudinal defects; the STT (transverse rotating probe) for the detection and characterization of circumferential defects. The new rotating probe should not increase the control time. Two new equipments have been developed to implement this new probe: a new support and a software of online inspection with data processing and analyzing. Abstract only. (A.L.B.)

  7. Simulation of sludge deposit onto a 900 MW steam generator tubesheet with the 3D code GENEPI

    International Nuclear Information System (INIS)

    Pascal-Ribot, S.; Debec-Mathet, E.; Soussan, D.; Grandotto, M.

    1998-01-01

    Heat transfer processes use fluids which are generally not pure and can react with transfer surfaces. These surfaces are subject to deposits which can be sediments harmful to heat transfer and to integrity of materials. For nuclear plant steam generators, sludge build-up accelerates secondary side corrosion by concentrating chemical species. A major safety problem involved with such a corrosion is the growing of circumferential cracks which are very difficult to detect and size with eddy current probes. With a view to understand and control this problem, it is necessary to develop a mathematical model for the prediction of sludge behavior in PWR steam generators. Based on fundamental principles, this work intends to use different models available in literature for the prediction of the phenomenon leading to the accumulation of sludge particles at the bottom (the tubesheet) of a PWR. For that, a three-dimensional simulation of magnetite particulate fouling with the finite elements code GENEPI is performed on a 900 MWe steam generator. The use of GENEPI code, originally designed and qualified for the analysis of steam generators thermalhydraulics is done in two steps. First, the local thermalhydraulic conditions of the carrier phase are calculated with the classical conservation equations of mass, momentum and enthalpy for the steam/water mixture (homogeneous model). Then, they are used for the solving of a particle transport equation. The mass transfer processes, which have been taken into account, are gravitational settling, sticking probability and reentrainment describing respectively the transport of sludge particles to the tubesheet, the particle attachment to this surface and the re-suspension of deposited particles from the tubesheet. A sink term characterizing the blowdown effect is also considered in the calculations. Deposition on the tube bundle surface area is not modelled. For this first approach, the simulation is made with a single particle size and

  8. Evaluation of power block arrangements for 100MW scale concentrated solar thermal power generation using top-down design

    Science.gov (United States)

    Post, Alexander; Beath, Andrew; Sauret, Emilie; Persky, Rodney

    2017-06-01

    Concentrated solar thermal power generation poses a unique situation for power block selection, in which a capital intensive heat source is subject to daily and seasonal fluctuations in intensity. In this study, a method is developed to easily evaluate the favourability of different power blocks for converting the heat supplied by a concentrated solar thermal plant into power at the 100MWe scale based on several key parameters. The method is then applied to a range of commercially available power cycles that operate over different temperatures and efficiencies, and with differing capital costs, each with performance and economic parameters selected to be typical of their technology type, as reported in literature. Using this method, the power cycle is identified among those examined that is most likely to result in a minimum levelised cost of energy of a solar thermal plant.

  9. Fuzzy logic based power management strategy of a multi-MW doubly-fed induction generator wind turbine with battery and ultracapacitor

    International Nuclear Information System (INIS)

    Sarrias-Mena, Raúl; Fernández-Ramírez, Luis M.; García-Vázquez, Carlos Andrés; Jurado, Francisco

    2014-01-01

    Integrating energy storage systems (ESS) with wind turbines results to be an interesting option for improving the grid integration capability of wind energy. This paper presents and evaluates a wind hybrid system consisting of a 1.5 MW doubly-fed induction generator (DFIG) wind turbine and double battery-ultracapacitor ESS. Commercially available components are used in this wind hybrid system. A novel supervisory control system (SCS) is designed and implemented, which is responsible for setting the active and reactive power references for each component of the hybrid system. A fuzzy logic controller, taking into account the grid demand, power generation prediction, actual DFIG power generation and state-of-charge (SOC) of the ESSs, sets the active power references. The reactive power references are proportionally delivered to each element regarding their current limitations in the SCS. The appropriate control of the power converters allows each power source to achieve the operation defined by the SCS. The wind hybrid system and SCS are assessed by simulation under wind fluctuations, grid demand changes, and grid disturbances. Results show an improved performance in the overall response of the system with the implementation of the SCS. - Highlights: • We study a wind hybrid system based on DFIG wind turbine, battery and ultracapacitor. • A novel supervisory control system based on fuzzy logic is designed and implemented. • The control improves the system response under different operating conditions

  10. Fabrication of a Scaled MgB2 Racetrack Demonstrator Pole for a 10-MW Direct-Drive Wind Turbine Generator

    DEFF Research Database (Denmark)

    Magnusson, Niklas; Eliassen, Jan Christian; Abrahamsen, Asger Bech

    2018-01-01

    Field windings made of MgB2 wires or tapes are considered for their potential to reduce volume, weight, and cost of large offshore wind turbine generators. To gain experience of how to use this relatively new material in full-scale generators, tests of different winding methodologies and techniques...... are needed. In this paper, we describe in detail the steps used to wind a racetrack coil with a length of 1 m and a width of 0.5 m out of 4.5 km of MgB2 superconducting tape. The width corresponds to a full-scale pole of a 10-MW generator, whereas the length of the straight section is shorter than...... the corresponding full-scale pole. The coil was built up of ten double pancake coils. Each double pancake coil was wet wound using a semiautomatic winding process, where Stycast 2850 was applied directly to the MgB2 tape without any other dedicated electrical insulation. The strengths and weaknesses of the winding...

  11. Sizing modelling and simulation of PV generation system feeding a 6 MW induction motor dedicated to pumping applications

    Directory of Open Access Journals (Sweden)

    Samir HADJERI

    2017-06-01

    Full Text Available This paper proposes an autonomous photovoltaic (PV pumping system for rural/remote applications especially in the large desert in northern Africa where the sun radiation is abundant. Since PV generators exhibit nonlinear I-V characteristics and their maximum power point varies with solar radiation. For this reason, the MPPT controller is used to optimize the solar energy conversion by guaranteeing fast maximum power point tracking (MPPT. This feature has an essential role in dynamic response and efficiency of the photovoltaic system, thus it maximizes the amount of extracted natural gas to be conveyed to another site for an ulterior utilization. Here a robust maximum power point tracker (MPPT using incremental conductance algorithm is applied to the duty cycle value of the DC-DC converter which acts directly on the drive speed. A DC/DC boost is used to enhance voltage up to the favourite level and the SVPWM inverter connects it to a powerful induction motor for a pumping of natural gas application, these systems are at the heart of many industrial sectors such as the oil industry, the production of thermal and nuclear energy etc. An understanding of how these systems operate is essential to increase their performance and reduce their operating costs. Furthermore, three phase voltage-fed PWM inverters are recently showing growing popularity for multi-megawatt industrial drive applications, the main purpose of these topologies is to provide a three-phase voltage source, where the amplitude, phase, and frequency of the voltages should always be controllable. The model of a three-phase voltage source inverter is modelled and discussed based on space vector modulation theory. Simulation results are obtained using MATLAB/Simulink environment for effectiveness of the proposed system.

  12. Fiber Bragg Grating Temperature Sensors in a 6.5-MW Generator Exciter Bridge and the Development and Simulation of Its Thermal Model

    Directory of Open Access Journals (Sweden)

    Kleiton de Morais Sousa

    2014-09-01

    Full Text Available This work reports the thermal modeling and characterization of a thyristor. The thyristor is used in a 6.5-MW generator excitation bridge. Temperature measurements are performed using fiber Bragg grating (FBG sensors. These sensors have the benefits of being totally passive and immune to electromagnetic interference and also multiplexed in a single fiber. The thyristor thermal model consists of a second order equivalent electric circuit, and its power losses lead to an increase in temperature, while the losses are calculated on the basis of the excitation current in the generator. Six multiplexed FBGs are used to measure temperature and are embedded to avoid the effect of the strain sensitivity. The presented results show a relationship between field current and temperature oscillation and prove that this current can be used to determine the thermal model of a thyristor. The thermal model simulation presents an error of 1.5 °C, while the FBG used allows for the determination of the thermal behavior and the field current dependence. Since the temperature is a function of the field current, the corresponding simulation can be used to estimate the temperature in the thyristors.

  13. Fiber Bragg grating temperature sensors in a 6.5-MW generator exciter bridge and the development and simulation of its thermal model.

    Science.gov (United States)

    de Morais Sousa, Kleiton; Probst, Werner; Bortolotti, Fernando; Martelli, Cicero; da Silva, Jean Carlos Cardozo

    2014-09-05

    This work reports the thermal modeling and characterization of a thyristor. The thyristor is used in a 6.5-MW generator excitation bridge. Temperature measurements are performed using fiber Bragg grating (FBG) sensors. These sensors have the benefits of being totally passive and immune to electromagnetic interference and also multiplexed in a single fiber. The thyristor thermal model consists of a second order equivalent electric circuit, and its power losses lead to an increase in temperature, while the losses are calculated on the basis of the excitation current in the generator. Six multiplexed FBGs are used to measure temperature and are embedded to avoid the effect of the strain sensitivity. The presented results show a relationship between field current and temperature oscillation and prove that this current can be used to determine the thermal model of a thyristor. The thermal model simulation presents an error of 1.5 °C, while the FBG used allows for the determination of the thermal behavior and the field current dependence. Since the temperature is a function of the field current, the corresponding simulation can be used to estimate the temperature in the thyristors.

  14. Criticality and safety parameter studies for upgrading 3 MW TRIGA MARK II research reactor and validation of generated cross section library and computational method

    International Nuclear Information System (INIS)

    Bhuiyan, S.I.; Mondal, M.A.W.; Sarker, M.M.; Rahman, M.; Shahdatullah, M.S.; Huda, M.Q.; Chakrroborty, T.K.; Khan, M.J.H.

    2000-01-01

    This study deals with the neutronic and thermal hydraulic analysis of the 3MW TRIGA MARK II research reactor to upgrade it to a higher flux. The upgrading will need a major reshuffling and reconfiguration of the current core. To reshuffle the current core configuration, the chain of NJOY94.10 - WIMSD-5A - CITATION - PARET - MCNP4B2 codes has been used for the overall analysis. The computational methods, tools and techniques, customisation of cross section libraries, various models for cells and super cells, and a lot of associated utilities have been standardised and established/validated for the overall core analysis. Analyses using the 4-group and 7-group libraries of macroscopic cross sections generated from the 69-group WIMSD-5 library showed that a 7-group structure is more suitable for TRIGA calculations considering its LEU fuel composition. The MCNP calculations established that the CITATION calculations and the generated cross section library are reasonably good for neutronic analysis of TRIGA reactors. Results obtained from PARET demonstrated that the flux upgrade will not cause the temperature limit on the fuel to be exceeded. Also, the maximum power density remains, by a substantial margin below the level at which the departure from nucleate boiling could occur. A possible core with two additional irradiation channels around the CT is projected where almost identical thermal fluxes as in the CT are obtained. The reconfigured core also shows 7.25% thermal flux increase in the Lazy Susan. (author)

  15. Generation of more than 300 mW diffraction-limited light at 405 nm by second-harmonic generation of a tapered diode laser with external cavity feedback

    DEFF Research Database (Denmark)

    Jensen, Ole Bjarlin; Holm, J.; Sumpf, B.

    2007-01-01

    We have constructed a blue laser source consisting of a single-frequency tapered diode laser with external cavity feedback that is frequency doubled by a quasi-phase matched KTP (PPKTP) in a bowtie ring cavity and extract more than 360 mW of power at 405 nm. The conversion efficiency from...... fundamental laser power to second harmonic power is 35 %, while it is 64 % from coupled fundamental power to extracted blue light. Thermal effects and gray tracking set an upper limit on the amount of generated blue light....

  16. Duration of Tsunami Generation Longer than Duration of Seismic Wave Generation in the 2011 Mw 9.0 Tohoku-Oki Earthquake

    Science.gov (United States)

    Fujihara, S.; Korenaga, M.; Kawaji, K.; Akiyama, S.

    2013-12-01

    We try to compare and evaluate the nature of tsunami generation and seismic wave generation in occurrence of the 2011 Tohoku-Oki earthquake (hereafter, called as TOH11), in terms of two type of moment rate functions, inferred from finite source imaging of tsunami waveforms and seismic waveforms. Since 1970's, the nature of "tsunami earthquakes" has been discussed in many researches (e.g. Kanamori, 1972; Kanamori and Kikuchi, 1993; Kikuchi and Kanamori, 1995; Ide et al., 1993; Satake, 1994) mostly based on analysis of seismic waveform data , in terms of the "slow" nature of tsunami earthquakes (e.g., the 1992 Nicaragura earthquake). Although TOH11 is not necessarily understood as a tsunami earthquake, TOH11 is one of historical earthquakes that simultaneously generated large seismic waves and tsunami. Also, TOH11 is one of earthquakes which was observed both by seismic observation network and tsunami observation network around the Japanese islands. Therefore, for the purpose of analyzing the nature of tsunami generation, we try to utilize tsunami waveform data as much as possible. In our previous studies of TOH11 (Fujihara et al., 2012a; Fujihara et al., 2012b), we inverted tsunami waveforms at GPS wave gauges of NOWPHAS to image the spatio-temporal slip distribution. The "temporal" nature of our tsunami source model is generally consistent with the other tsunami source models (e.g., Satake et al, 2013). For seismic waveform inversion based on 1-D structure, here we inverted broadband seismograms at GSN stations based on the teleseismic body-wave inversion scheme (Kikuchi and Kanamori, 2003). Also, for seismic waveform inversion considering the inhomogeneous internal structure, we inverted strong motion seismograms at K-NET and KiK-net stations, based on 3-D Green's functions (Fujihara et al., 2013a; Fujihara et al., 2013b). The gross "temporal" nature of our seismic source models are generally consistent with the other seismic source models (e.g., Yoshida et al

  17. 77 FR 71788 - Notice of Change to the Publication of Natural Gas Wellhead Prices

    Science.gov (United States)

    2012-12-04

    ... Act (Pub. L. 95-91, 42 U.S.C. 7101 et seq.) require the EIA to carry out a centralized, comprehensive... disseminates information on energy resource reserves, production, demand, technology, and related economic... gas wellhead price using a time-series econometric model, which incorporates data from historical...

  18. Marine magnetic studies over a lost wellhead in Palk Bay, Cauvery Basin, India

    Digital Repository Service at National Institute of Oceanography (India)

    Ramana, M.V.; Subrahmanyam, V.; Sarma, K.V.L.N.S.; Seshavataram, B.T.V.

    Close grid marine magnetic surveys in the vicinity of a drill well site PH 9-1 in Palk Bay revealed that the area is characterized by smooth magnetic field except for a local anomaly caused by a lost wellhead. The smooth magnetic field is attributed...

  19. Conceptual designs for 100-MW space radiators

    International Nuclear Information System (INIS)

    Prenger, F.C.; Sullivan, J.A.

    1982-01-01

    A description and comparison of heat rejection systems for multimegawatt space-based power supplies is given. Current concepts are described, and through a common performance parameter, these are compared with three advanced radiator concepts. The comparison is based on a power system that rejects 100 MW of heat while generating 10 MW of electrical power

  20. A Lift-Off-Tolerant Magnetic Flux Leakage Testing Method for Drill Pipes at Wellhead.

    Science.gov (United States)

    Wu, Jianbo; Fang, Hui; Li, Long; Wang, Jie; Huang, Xiaoming; Kang, Yihua; Sun, Yanhua; Tang, Chaoqing

    2017-01-21

    To meet the great needs for MFL (magnetic flux leakage) inspection of drill pipes at wellheads, a lift-off-tolerant MFL testing method is proposed and investigated in this paper. Firstly, a Helmholtz coil magnetization method and the whole MFL testing scheme are proposed. Then, based on the magnetic field focusing effect of ferrite cores, a lift-off-tolerant MFL sensor is developed and tested. It shows high sensitivity at a lift-off distance of 5.0 mm. Further, the follow-up high repeatability MFL probing system is designed and manufactured, which was embedded with the developed sensors. It can track the swing movement of drill pipes and allow the pipe ends to pass smoothly. Finally, the developed system is employed in a drilling field for drill pipe inspection. Test results show that the proposed method can fulfill the requirements for drill pipe inspection at wellheads, which is of great importance in drill pipe safety.

  1. A Lift-Off-Tolerant Magnetic Flux Leakage Testing Method for Drill Pipes at Wellhead

    Directory of Open Access Journals (Sweden)

    Jianbo Wu

    2017-01-01

    Full Text Available To meet the great needs for MFL (magnetic flux leakage inspection of drill pipes at wellheads, a lift-off-tolerant MFL testing method is proposed and investigated in this paper. Firstly, a Helmholtz coil magnetization method and the whole MFL testing scheme are proposed. Then, based on the magnetic field focusing effect of ferrite cores, a lift-off-tolerant MFL sensor is developed and tested. It shows high sensitivity at a lift-off distance of 5.0 mm. Further, the follow-up high repeatability MFL probing system is designed and manufactured, which was embedded with the developed sensors. It can track the swing movement of drill pipes and allow the pipe ends to pass smoothly. Finally, the developed system is employed in a drilling field for drill pipe inspection. Test results show that the proposed method can fulfill the requirements for drill pipe inspection at wellheads, which is of great importance in drill pipe safety.

  2. Evaluating a kinematic method for generating broadband ground motions for great subduction zone earthquakes: Application to the 2003 Mw 8.3 Tokachi‐Oki earthquake

    Science.gov (United States)

    Wirth, Erin A.; Frankel, Arthur; Vidale, John E.

    2017-01-01

    We compare broadband synthetic seismograms with recordings of the 2003 Mw">MwMw 8.3 Tokachi‐Oki earthquake to evaluate a compound rupture model, in which slip on the fault consists of multiple high‐stress‐drop asperities superimposed on a background slip distribution with longer rise times. Low‐frequency synthetics (frequency (>1  Hz">>1  Hz>1  Hz) stochastic synthetics using a matched filter at 1 Hz. We show that this compound rupture model and overall approach accurately reproduces waveform envelopes and observed response spectral accelerations (SAs) from the Tokachi‐Oki event. We find that sufficiently short subfault rise times (i.e., ∼1  Hz∼1  Hz. This is achieved by either (1) including distinct subevents with short rise times, as may be suggested by the Tokachi‐Oki data, or (2) imposing a fast‐slip velocity over the entire rupture area. We also include a systematic study on the effects of varying several kinematic rupture parameters. We find that simulated strong ground motions are sensitive to the average rupture velocity and coherence of the rupture front, with more coherent ruptures yielding higher response SAs. We also assess the effects of varying the average slip velocity and the character (i.e., area, magnitude, and location) of high‐stress‐drop subevents. Even in the absence of precise constraints on these kinematic rupture parameters, our simulations still reproduce major features in the Tokachi‐Oki earthquake data, supporting its accuracy in modeling future large earthquakes.

  3. Wellhead to wire utilization of remote gas resources

    International Nuclear Information System (INIS)

    Harris, R.A.; Hines, T.L.

    1998-01-01

    Utilization of remote gas resources in developing countries continues to offer challenges and opportunities to producers and contractors. The Aguaytia Gas and Power Project is an example where perseverance and creativity resulted in successful utilization of natural gas resources in the Ucayali Region of Central Peru, a country which previously had no natural gas infrastructure. The resource for the project was first discovered by Mobil in 1961, and remained undeveloped for over thirty years due to lack of infrastructure and markets. Maple Gas won a competitively bid contract to develop the Aguaytia gas reserves in March of 1993. The challenges facing Maple Gas were to develop downstream markets for the gas, execute contracts with Perupetro S.A. and other Peruvian government entities, raise financing for the project, and solicit and execute engineering procurement and construction (EPC) contracts for the execution of the project. The key to development of the downstream markets was the decision to generate electric power and transmit the power over the Andes to the main electrical grid along the coast of Peru. Supplemental revenue could be generated by gas sales to a small regional power plant and extraction of LPG and natural gasoline for consumption in the Peruvian market. Three separate lump sum contracts were awarded to Asea Brown Boveri (ABB) companies for the gas project, power project and transmission project. Each project presented its unique challenges, but the commonalities were the accelerated schedule, high rainfall in a prolonged wet season and severe logistics due to lack of infrastructure in the remote region. This presentation focuses on how the gas plant contractor, ABB Randall, working in harmony with the developer, Maple Gas, tackled the challenges to monetize a remote gas resource

  4. Generation of 320 mW at 10.20 μm based on CdSe long-wave infrared crystal

    Science.gov (United States)

    Wang, Jian; Yuan, Ligang; Zhang, Yingwu; Chen, Guo; Cheng, Hongjuan; Gao, Yanzhao

    2018-06-01

    CdSe single crystal, with the sizes of ∼54 mm in diameter and ∼25 mm in length, was grown by a high pressure vertical gradient freeze (HPVGF) technique using (0 0 1)-oriented seed. The CdSe crystal was characterized with transmission spectrophotometer. The transmission spectra showed that the infrared transmission was above 68% and the mean absorption coefficient was 0.041 cm-1 in the range of 2.5-20 μm. Using fabricated CdSe crystal with the dimensions of 6 mm × 10 mm × 44 mm, we demonstrated an optical parametric oscillator (OPO) pumped by a 2.05 μm Ho:YLF laser at a pulse repetition frequency of 5 kHz. Up to 320 mW output was obtained at the idler wavelength of 10.20 μm with a pump power of 18.06 W. 320 mW at 10.20 μm, to our knowledge, was the highest power obtained with a 2.05 μm laser-pumped CdSe OPO.

  5. DANAERO MW: Final Report

    DEFF Research Database (Denmark)

    Troldborg, Niels; Bak, Christian; Aagaard Madsen, Helge

    This report describes the results of the EUDP funded DANAERO MW II project carried out by DTU Wind Energy (formerly Risø DTU) and the industrial partners, LM Wind Power, Vestas Wind Systems A/S and Siemens Wind Power. An overview of the data available from the project as well as the results from...... analysis of the data is given with the main objective to explore in detail the influence of atmospheric and wake turbulence on MW turbine performance, loading and stability. Finally, validation and demonstration of simulation codes are carried out....

  6. Wave Dragon MW

    DEFF Research Database (Denmark)

    Kofoed, Jens Peter; Frigaard, Peter

    Wave Dragon is a wave energy converter of the overtopping type. The device has been thoroughly tested on a 1:51.8 scale model in wave laboratories and a 1:4.5 scale model deployed in Nissum Bredning, a large inland waterway in Denmark. Based on the experience gained a full scale, multi MW prototype...

  7. A Lift-Off-Tolerant Magnetic Flux Leakage Testing Method for Drill Pipes at Wellhead

    OpenAIRE

    Wu, Jianbo; Fang, Hui; Li, Long; Wang, Jie; Huang, Xiaoming; Kang, Yihua; Sun, Yanhua; Tang, Chaoqing

    2017-01-01

    To meet the great needs for MFL (magnetic flux leakage) inspection of drill pipes at wellheads, a lift-off-tolerant MFL testing method is proposed and investigated in this paper. Firstly, a Helmholtz coil magnetization method and the whole MFL testing scheme are proposed. Then, based on the magnetic field focusing effect of ferrite cores, a lift-off-tolerant MFL sensor is developed and tested. It shows high sensitivity at a lift-off distance of 5.0 mm. Further, the follow-up high repeatabilit...

  8. The 2012 Mw 8.6 Wharton Basin sequence: A cascade of great earthquakes generated by near-orthogonal, young, oceanic mantle faults

    Science.gov (United States)

    Hill, Emma M.; Yue, Han; Barbot, Sylvain; Lay, Thorne; Tapponnier, Paul; Hermawan, Iwan; Hubbard, Judith; Banerjee, Paramesh; Feng, Lujia; Natawidjaja, Danny; Sieh, Kerry

    2015-05-01

    We improve constraints on the slip distribution and geometry of faults involved in the complex, multisegment, Mw 8.6 April 2012 Wharton Basin earthquake sequence by joint inversion of high-rate GPS data from the Sumatran GPS Array (SuGAr), teleseismic observations, source time functions from broadband surface waves, and far-field static GPS displacements. This sequence occurred under the Indian Ocean, ˜400 km offshore Sumatra. The events are extraordinary for their unprecedented rupture of multiple cross faults, deep slip, large strike-slip magnitude, and potential role in the formation of a discrete plate boundary between the Indian and Australian plates. The SuGAr recorded static displacements of up to ˜22 cm, along with time-varying arrivals from the complex faulting, which indicate that the majority of moment release was on young, WNW trending, right-lateral faults, counter to initial expectations that an old, lithospheric, NNE trending fracture zone played the primary role. The new faults are optimally oriented to accommodate the present-day stress field. Not only was the greatest moment released on the younger faults, but it was these that sustained very deep slip and high stress drop (>20 MPa). The rupture may have extended to depths of up to 60 km, suggesting that the oceanic lithosphere in the northern Wharton Basin may be cold and strong enough to sustain brittle failure at such depths. Alternatively, the rupture may have occurred with an alternative weakening mechanism, such as thermal runaway.

  9. Effects of an electromagnetic shield and armature teeth on the short-circuit performance of a direct drive superconducting generator for 10 MW wind turbines

    DEFF Research Database (Denmark)

    Liu, Dong; Polinder, Henk; Abrahamsen, Asger Bech

    2015-01-01

    reactance. An electromagnetic (EM) shield between the rotor and the stator as well as iron or non-magnetic composite (NMC) armature teeth affects the sub-transient reactance of a superconducting machine so that they play a role in the short-circuit performance of a superconducting wind generator. This paper...

  10. Automatic crude oil handling through a pressurized system from the wellhead to the refinery

    Energy Technology Data Exchange (ETDEWEB)

    Davis, W.B.; Truman, P.W.; Groeneman, A.R.

    1967-01-01

    Production from 51 wells completed in the 3 unitized formations of the Lost Soldier Field, Sweetwater Co., Wyoming, is brought to a central point through individual flow lines. Here the fluids are directed through separate automatic well testing and oil treating facilities, one for each formation. After separation of oil, gas and water, the oil goes to pressurized surge tanks and then to lease automatic custody transfer units. There is one surge tank and one LACT unit for each formation. The oil is automatically transferred to the Sinclair Pipe Line Co. for delivery to Sinclair's refinery at Sinclair, Wyoming, through a closed pipe line system. A central console provides: (1) supervisory control from the wellheads through the LACT units, (2) well test and production data logging, and (3) monitoring by activating alarms for abnormal conditions of flow, liquid levels, temperatures and pressures.

  11. Boxberg III-2 x 500 MW units: Refurbishing and environmental protection measures on the 815 T/H steam generator of works II in Boxberg Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Cossman, R.; Fritz, M.; Bauchmueller, R. [L& C Steinmueller GmbH, Gummersbach (Germany)

    1995-12-01

    The object of the upgrading measures on the steam generators is: (1) To comply with the requirements of the German antipollution law, which imposes a permissible NO{sub x} content in the flue gas of less than 200 Mg/m{sup 3} STP and a CO content of less than 250 Mg/m{sup 3} STP. (2) To increase the boiler efficiency and availability and the efficiency of the water/steam cycle.

  12. Integrating a full carbon capture scheme onto a 450 MW{sub e} NGCC electric power generation hub for offshore operations: Presenting the Sevan GTW concept

    Energy Technology Data Exchange (ETDEWEB)

    Hetland, Jens [SINTEF Energy Research, Kolbjorn Hejesvei 1A, N-7465 Trondheim (Norway); Kvamsdal, Hanne Marie; Haugen, Geir [SINTEF Materials and Chemistry, Trondheim (Norway); Major, Fredrik [Sevan Marine ASA, Arendal (Norway); Kaarstad, Vemund [SIEMENS Oil and Gas Offshore AS, Oslo (Norway); Tjellander, Goeran [SIEMENS Industrial Turbomachinery AB, Finspong (Sweden)

    2009-11-15

    Sevan Marine and Siemens have developed a floating power plant - entitled Sevan GTW (gas-to-wire) - based on Sevan's cylindrical platform and Siemens' SCC-800 combined cycle, and SINTEF has adapted a post-combustion CO{sub 2} capture process for on board integration including compression and preconditioning of the CO{sub 2}. Main emphasis has been placed on developing an optimised conceptual design within the structural constraints, and assessing how efficient the capture unit may be operated in consideration of the dynamic behaviour induced by the sea on the absorber and desorber columns via the floating carrier. The rational behind this technology selection is the urgency in making appropriate steps for a quick start for remote power generation at sea with the inclusion of CCS to serve offshore oil and gas operations. This calls for modular power blocks made up by high efficient combined power cycles with post-combustion exhaust gas cleaning. From this point of view a system with four absorption columns and one desorber unit has been determined based on structured packing material. The capture process has been integrated with the power cycle in due consideration of the sea forces. It is shown that a permanent tilt becomes more important than periodic movements provided the harmonic periods are kept within a certain level (<20 s). Operational conditions and constraints vis-a-vis movements and trimming of the floater have been addressed and discussed with reference to available literature. This also includes the liquid hold-up and gas-liquid interfacial area in the absorption columns linked with tilting. Optimisation reveals that a reboiler duty of 3.77 GJ/ton CO{sub 2} would result in the lowest capture cost. With a energy penalty of 9%-points the Sevan GTW concept presents itself as a realistic concept deemed to be within reach today. (author)

  13. Probabilistic risk analysis and fault trees: Initial discussion of application to identification of risk at a wellhead

    Science.gov (United States)

    Rodak, C.; Silliman, S.

    2012-02-01

    Wellhead protection is of critical importance for managing groundwater resources. While a number of previous authors have addressed questions related to uncertainties in advective capture zones, methods for addressing wellhead protection in the presence of uncertainty in the chemistry of groundwater contaminants, the relationship between land-use and contaminant sources, and the impact on health of the receiving population are limited. It is herein suggested that probabilistic risk analysis (PRA) combined with fault trees (FT) provides a structure whereby chemical transport can be combined with uncertainties in source, chemistry, and health impact to assess the probability of negative health outcomes in the population. As such, PRA-FT provides a new strategy for the identification of areas of probabilistically high human health risk. Application of this approach is demonstrated through a simplified case study involving flow to a well in an unconfined aquifer with heterogeneity in aquifer properties and contaminant sources.

  14. Human health tradeoffs in wellhead drinking water treatment: Comparing exposure reduction to embedded life cycle risks.

    Science.gov (United States)

    Gifford, Mac; Chester, Mikhail; Hristovski, Kiril; Westerhoff, Paul

    2018-01-01

    Treatment of drinking water decreases human health risks by reducing pollutants, but the required materials, chemicals, and energy emit pollutants and increase health risks. We explored human carcinogenic and non-carcinogenic disease tradeoffs of water treatment by comparing pollutant dose-response curves against life cycle burden using USEtox methodology. An illustrative wellhead sorbent groundwater treatment system removing hexavalent chromium or pentavalent arsenic serving 3200 people was studied. Reducing pollutant concentrations in drinking water from 20 μg L -1 to 10 μg L -1 avoided 37 potential cancer cases and 64 potential non-cancer disease cases. Human carcinogenicity embedded in treatment was 0.2-5.3 cases, and non-carcinogenic toxicity was 0.2-14.3 cases, depending on technology and degree of treatment. Embedded toxicity impacts from treating Cr(VI) using strong-base anion exchange were 90% of the toxicity impacts for treatment options requiring pH control. In scenarios where benefits exceeded burdens, tradeoffs still existed. Benefits are experienced by a local population but burdens are born externally where the materials and energy are produced, thus exporting the health risks. Even when burdens clearly exceeded benefits, cost considerations may still drive selecting a detrimental treatment level or technology. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. The Winfrith 9MW heat transfer rig

    International Nuclear Information System (INIS)

    Obertelli, J.D.

    1976-01-01

    The Winfrith 9MW Rig is used for studying heat transfer and flow resistance in a variety of test sections at system pressures up to 68 bar. The basic rig and its instrumentation are discussed together with the characteristics of the test section design. The rig has been used in studies involving the full scale simulation of Steam Generating Heavy Water (SGHW) fuel assemblies and the paper discusses the measurements made in this type of study. (author)

  16. Structural Optimization of an Innovative 10 MW Wind Turbine Nacelle

    DEFF Research Database (Denmark)

    Dabrowski, Dariusz; Natarajan, Anand; Stehouwer, Ewoud

    2015-01-01

    For large wind turbine configurations of 10 MW and higher capacities, direct-drives present a more compact solution over conventional geared drivetrains. Further, if the generator is placed in front of the wind turbine rotor, a compact “king-pin” drive is designed, that allows the generator...... to be directly coupled to the hub. In presented study, the structural re-design of the innovative 10 MW nacelle was made using extreme loads obtained from a 10 MW reference wind turbine. On the basis of extreme loads the ultimate stresses on critical nacelle components were determined to ensure integrity...

  17. Hurricane Satellite (HURSAT) Microwave (MW)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Hurricane Satellite (HURSAT) from Microwave (MW) observations of tropical cyclones worldwide data consist of raw satellite observations. The data derive from the...

  18. Resolution 369/012. It authorize to Vientos de Pastoral S.A. to generate a wind power electricity source by 150.0 MW generating station section, and their connection to National interconnected system

    International Nuclear Information System (INIS)

    2012-01-01

    It has been allowed the wind power generation electricity energy source as a the primary electricity source. This project was presented by the Vientos de Pastoral S.A company according to the opinion of the National Energy Regulatory Unit and the Energy and Water Services in relation with the requirements of the current rule

  19. Nine steps to risk-informed wellhead protection and management: Methods and application to the Burgberg Catchment

    Science.gov (United States)

    Nowak, W.; Enzenhoefer, R.; Bunk, T.

    2013-12-01

    Wellhead protection zones are commonly delineated via advective travel time analysis without considering any aspects of model uncertainty. In the past decade, research efforts produced quantifiable risk-based safety margins for protection zones. They are based on well vulnerability criteria (e.g., travel times, exposure times, peak concentrations) cast into a probabilistic setting, i.e., they consider model and parameter uncertainty. Practitioners still refrain from applying these new techniques for mainly three reasons. (1) They fear the possibly cost-intensive additional areal demand of probabilistic safety margins, (2) probabilistic approaches are allegedly complex, not readily available, and consume huge computing resources, and (3) uncertainty bounds are fuzzy, whereas final decisions are binary. The primary goal of this study is to show that these reservations are unjustified. We present a straightforward and computationally affordable framework based on a novel combination of well-known tools (e.g., MODFLOW, PEST, Monte Carlo). This framework provides risk-informed decision support for robust and transparent wellhead delineation under uncertainty. Thus, probabilistic risk-informed wellhead protection is possible with methods readily available for practitioners. As vivid proof of concept, we illustrate our key points on a pumped karstic well catchment, located in Germany. In the case study, we show that reliability levels can be increased by re-allocating the existing delineated area at no increase in delineated area. This is achieved by simply swapping delineated low-risk areas against previously non-delineated high-risk areas. Also, we show that further improvements may often be available at only low additional delineation area. Depending on the context, increases or reductions of delineated area directly translate to costs and benefits, if the land is priced, or if land owners need to be compensated for land use restrictions.

  20. Transient flow conditions in probabilistic wellhead protection: importance and ways to manage spatial and temporal uncertainty in capture zone delineation

    Science.gov (United States)

    Enzenhoefer, R.; Rodriguez-Pretelin, A.; Nowak, W.

    2012-12-01

    "From an engineering standpoint, the quantification of uncertainty is extremely important not only because it allows estimating risk but mostly because it allows taking optimal decisions in an uncertain framework" (Renard, 2007). The most common way to account for uncertainty in the field of subsurface hydrology and wellhead protection is to randomize spatial parameters, e.g. the log-hydraulic conductivity or porosity. This enables water managers to take robust decisions in delineating wellhead protection zones with rationally chosen safety margins in the spirit of probabilistic risk management. Probabilistic wellhead protection zones are commonly based on steady-state flow fields. However, several past studies showed that transient flow conditions may substantially influence the shape and extent of catchments. Therefore, we believe they should be accounted for in the probabilistic assessment and in the delineation process. The aim of our work is to show the significance of flow transients and to investigate the interplay between spatial uncertainty and flow transients in wellhead protection zone delineation. To this end, we advance our concept of probabilistic capture zone delineation (Enzenhoefer et al., 2012) that works with capture probabilities and other probabilistic criteria for delineation. The extended framework is able to evaluate the time fraction that any point on a map falls within a capture zone. In short, we separate capture probabilities into spatial/statistical and time-related frequencies. This will provide water managers additional information on how to manage a well catchment in the light of possible hazard conditions close to the capture boundary under uncertain and time-variable flow conditions. In order to save computational costs, we take advantage of super-positioned flow components with time-variable coefficients. We assume an instantaneous development of steady-state flow conditions after each temporal change in driving forces, following

  1. Updated API document 6A will close API-ISO 9000 gap. [Oil and gas wellhead standards

    Energy Technology Data Exchange (ETDEWEB)

    Bell, S.

    1993-10-01

    The 17th edition of the American Petroleum Institute's (API) document 6A, covering wellheads and their components, is due early next year. As the API vs. International Standards Organization (ISO) 9000 struggle continues, this edition of 6A eliminates some unnecessary specifications, clarifies others, and includes metric specifications accepted by the ISO. The 17th edition will clarify some of the interpretations from earlier editions and further advise users how to acquire the API monogram. The goal of this edition is to make 6A acceptable to ISO as an international document so API can maintain control over petroleum equipment specifications and provide input and guidance in future regulations.

  2. Multilevel converters for 10 MW Wind Turbines

    DEFF Research Database (Denmark)

    Ma, Ke; Blaabjerg, Frede

    2011-01-01

    Several promising multi-level converter configurations for 10 MW Wind Turbines both with direct drive and one-stage gear box drive using Permanent Magnet Synchronous Generator (PMSG) are proposed, designed and compared. Reliability is a crucial indicator for large scale wind power converters...... that the three-level and five-level H-bridge converter topologies both have potential to achieve improved thermal performances compared to the three-level Neutral-Point-Clamped converter topology in the wind power application....

  3. Aeroelastic Optimization of MW Wind Turbines

    DEFF Research Database (Denmark)

    Hansen, Morten Hartvig; Zahle, Frederik

    This report contains the results from the Energy Development and Demonstration Project “Aeroelastic Optimization of MW wind turbine” (AeroOpt). The project has had the following five Work Packages: 1. Geometric non-linear, anisotropic beamelement forHAWC2 2. Closed-loop eigenvalue analysis...... of controlled wind turbines 3. Resonant wave excitation of lateral tower bending modes 4. Development of next generation aerodynamic design tools 5. Advanced design and verification of airfoils The purposes of these Work Packages are briefly described in the Preface and a summary of the results are given...

  4. High-resolution, multi-proxy characterization of the event deposit generated by the catastrophic events associated with the Mw 6.2 earthquake of 21 April 2007 in Aysén fjord (Chile)

    Science.gov (United States)

    De Batist, M. A.; Van Daele, M. E.; Cnudde, V.; Duyck, P.; Tjallingii, R. H.; Pino, M.; Urrutia, R.

    2012-12-01

    In 2007, a seismic swarm with more than 7000 recorded earthquakes affected the region around Aysén fjord, Chile (45°25'S). The series of seismic events reached a maximum on 21 April 2007, with an Mw 6.2 earthquake. Intensities as high as VIII to IX on the Modified Mercalli scale were reported around the epicenter. Multiple debris flows, rock slides and rock avalanches were triggered along the fjord's coastline, and several of these caused impact waves or tsunamis with wave heights of up to 6 m, which inundated the fjord shorelines and caused heavy damage and 10 casualties. In order to characterize in detail the imprint left by this series of catastrophic events in the sedimentary record of the fjord, we conducted a multi-disciplinary survey of the inner fjord region in December 2009. Multibeam bathymetry and high-resolution reflection seismic data reveal that large parts of the fjord basin floor, mostly at the foot of the fjord's steep underwater slopes, are covered by recent mass-wasting deposits or consist of mass-wasting-induced deformed basin-plain sediments. A series of short sediment cores collected throughout the inner fjord contain also the more distal deposits of this significant basin-wide mass-wasting event. By combining classical sedimentological techniques (i.e. grain-size analysis, LOI and magnetic susceptibility measurements, all at high resolution) with X-ray CT scanning and XRF scanning we were able to demonstrate that the event deposits encountered in the cores have a very complex signature and actually consist of a succession of several sub-deposits, comprising distal mass-flow deposits from different source areas (as evidenced by XRF-derived geochemical provenance indications) and with a different flow direction (as evidenced by CT-derived 3D flow-direction indications, such as imbricated rip-up mud clasts, cross and convolute laminations) and tsunami- or seiche-generated deposits. This allowed us to reconstruct the succession of sedimentary

  5. 600 MW nuclear power database

    International Nuclear Information System (INIS)

    Cao Ruiding; Chen Guorong; Chen Xianfeng; Zhang Yishu

    1996-01-01

    600 MW Nuclear power database, based on ORACLE 6.0, consists of three parts, i.e. nuclear power plant database, nuclear power position database and nuclear power equipment database. In the database, there are a great deal of technique data and picture of nuclear power, provided by engineering designing units and individual. The database can give help to the designers of nuclear power

  6. 50 MW C-band pulse klystron; 50MW C band pulse klystron

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    C-band pulse klystron E3746 with an output of 50 MW class was developed jointly with the High-Energy Accelerator Research Organization in the Ministry of Education as the klystron for a linear accelerator. For a large-sized linear accelerator in the next generation, a klystron with higher operating frequency has been required to obtain a compact and efficient accelerator. In E3746, the problem of power resistance during high-frequency operation was solved by mounting a traveling-wave multi-cell output circuit. Moreover, stable operation in the pulse width of 2.5 {mu}s and the output of 54 MW was performed at the same operation efficiency (44%) as the conventional S-band tube by using the frequency (in a C-band frequency band) that is two times as high as the conventional general accelerator. (translated by NEDO)

  7. 12MW: final report; Wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Hasager, C.; Pena, A.; Mikkelsen, T.; Gryning, S.-E.; Courtney, M.; Soerensen, Paul B. (DONG energy)

    2009-06-15

    '12MW: final report' is for the project with the full title '12 MW wind turbines: the scientific basis for their operation at 70 to 270 m height offshore' that had the goal to experimentally investigate the wind and turbulence characteristics between 70 and 270 m above sea level and thereby establish the scientific basis relevant for the next generation of huge 12 MW wind turbines operating offshore. The project started 1st October 2005 and ended 31st March 2009. Firstly was conducted a 6-month experiment at the Horns Rev offshore wind farm deploying a lidar and a sodar on the transformer platform. The observed data were successfully compared to offshore mast data and the wind profile was extended 100 m above previous levels observed in this offshore environment. The wind and turbulence was observed up to 160m above mean sea level. A new normalization was introduced to group the wind profiles into stability groups with variable roughness. Secondly two experiments were conducted at Hoevsoere at the North Sea coast in Jutland. Again the wind profile was extended far beyond previous observed levels, up to 300 m above ground. The analysis showed that the profiles extended far beyond the surface layer and therefore surface layer scale alone could not described the profiles well. In addition the boundary layer height has to be used for the scaling. The boundary layer height was observed by an aerosol lidar at Hoevsoere. The results are published widely, please see the list of publications. (au)

  8. 6MW solar plant integration feasibility study : Bonaire island case study

    NARCIS (Netherlands)

    Sun, Yin; De Jong, Erik; Cuk, Vladimir; Cobben, Sjef

    2016-01-01

    The power supply on Bonaire is characterized by a high penetration of wind energy. Currently 5 diesel generators (total capacity 14MW) and 12 wind turbines (total capacity 10.8MW) operated by ContourGlobal generate electricity for Water and Electricity Bonaire (WEB). To meet future power demand

  9. Five MW Nuclear Heating Reactor

    International Nuclear Information System (INIS)

    Zhang Dafang; Dong Duo; Su Qingshan

    1997-01-01

    The 5 MW Nuclear Heating Reactor (NHR-5) developed and designed by the Institute of Nuclear Energy Technology (INET) has been operated for four winter seasons since 1989. During the time of commissioning and operation a number of experiments including self-stability, self-regulation, and simulation of ATWS etc. were carried out. Some operating experiences such as water chemistry, radiation protection and environmental impacts and so on were also obtained at the same time. All of these results demonstrate the design of the NHR-5 is successful. (author). 9 refs, 11 figs, 5 tabs

  10. Five MW Nuclear Heating Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Dafang, Zhang; Duo, Dong; Qingshan, Su [Institute of Nuclear Energy and Technology, Tsingua Univ., Beijing (China)

    1997-09-01

    The 5 MW Nuclear Heating Reactor (NHR-5) developed and designed by the Institute of Nuclear Energy Technology (INET) has been operated for four winter seasons since 1989. During the time of commissioning and operation a number of experiments including self-stability, self-regulation, and simulation of ATWS etc. were carried out. Some operating experiences such as water chemistry, radiation protection and environmental impacts and so on were also obtained at the same time. All of these results demonstrate the design of the NHR-5 is successful. (author). 9 refs, 11 figs, 5 tabs.

  11. Development of hot water utilizing power plant in fiscal 1998. Development of a binary cycle power generation plant (development of a 10-MW class plant); 1998 nendo nessui riyo hatsuden plant nado kaihatsu. Binary cycle hatsuden plant no kaihatsu (10MW kyu plant no kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This paper summarizes the achievements in fiscal 1998 on developing a 10-MW geothermal power plant in the Hohi-Sugawara area being a representative area of middle-to-high temperature hot water resources. In designing the plant, domestic and overseas surveys were carried out on media suitable for binary cycle power plants, thermal cycle characteristics, construction cost, environmental effects, safety, operation, maintenance and control. Latest technologies were also surveyed and analyzed. The plant construction performed development construction around the testing devices, new construction of a plant control room building, constructions for installing electrical machines including the hot water system testing devices, river water intake facility construction, and cooling water intake facility installing construction. The environmental effect investigation included investigations on rain falls, river flow rates, hot springs, spring water, monitoring during the construction, and the state of transplantation of precious plants, and observation on groundwater variation. In verifying the geothermal water pumping system, factory tests were carried out on DHP3 demonstration machine which couples the pump section of a down-hole pump with the motor section, whose performance and functions were verified. (NEDO)

  12. 350 MW(t) MHTGR preassembly and modularization

    International Nuclear Information System (INIS)

    Venkatesh, M.C.; Jones, G.; Dilling, D.A.; Parker, W.J.

    1991-05-01

    The Modular High Temperature Gas Cooled Reactor (MHTGR) provides a safe and economical nuclear power option for the world's electrical generation needs by the turn of the century. The proposed MHTGR plant is composed of four 350 MW(t) prismatic core reactor modules, coupled to a 2(2 x 1) turbine generator producing a net plant electrical output of 538 MW(e). Each of the four reactor module is located in a below-ground level concrete silo, and consists of a reactor vessel and a steam generator vessel interconnected by a cross duct vessel. The modules, along with the service buildings, are contained within a Nuclear Island (NI). The turbine generators and power generation facilities are in the non-nuclear Energy Conversion Area (ECA). The MHTGR design reduces cost and improves schedule by maximizing shop fabrication, minimizing field fit up of the Reactor Internals components and modularizing the NI ampersand ECA facilities. 3 refs., 6 figs., 2 tabs

  13. Aeroelastic optimization of MW wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Hartvig Hansen, M.; Zahle, F.

    2011-12-15

    This report contains the results from the Energy Development and Demonstration Project ''Aeroelastic Optimization of MW wind turbine'' (AeroOpt). The project has had the following five Work Packages: 1. Geometric non-linear, anisotropic beam element for HAWC2. 2. Closed-loop eigenvalue analysis of controlled wind turbines. 3. Resonant wave excitation of lateral tower bending modes. 4. Development of next generation aerodynamic design tools. 5. Advanced design and verification of airfoils. The purposes of these Work Packages are briefly described in the Preface and a summary of the results are given in Section 2. Thereafter, the results from each Work Package are described in eight subsequent chapters. (Author)

  14. The 1.5 MW wind turbine of tomorrow

    Energy Technology Data Exchange (ETDEWEB)

    De Wolff, T.J.; Sondergaard, H. [Nordtank Energy Group, Richmond, VA (United States)

    1996-12-31

    The Danish company Nordtank is one of the pioneers within the wind turbine industry. Since 1981 Nordtank has installed worldwide more than 2300 wind turbine generators with a total name plate capacity that is exceeding 350 MW. This paper will describe two major wind turbine technology developments that Nordtank has accomplished during the last year: Site Optimization of Nordtank wind turbines: Nordtank has developed a flexible design concept for its WTGs in the 500/600 kW range, in order to offer the optimal WTG solution for any given site and wind regime. Nordtank`s 1.5 MW wind turbine: In September 1995, Nordtank was the first company to install a commercial 1.5 NM WTG. This paper will document the development process, the design as well as operations of the Nordtank 1.5 MW WTG.

  15. Studi Pemanfaatan Limbah Padat dari Perkebunan Kelapa Sawit pada PLTU 6 MW di Bangka Belitung

    Directory of Open Access Journals (Sweden)

    Harris Harris

    2013-03-01

    Full Text Available Limbah padat dari perkebunan kelapa sawit berupa cangkang dan fibre dapat dimanfaatkan sebagai sumber energi alternatif pada PLTU. Cangkang memiliki kandungan energi sebesar 4115 kkal/kg dan fibre sebesar 3500 kkal/kg. Cangkang dan fibre dimanfaatkan sebagai bahan bakar pada PLTU 6 MW, yang digunakan untuk memanaskan air didalam boiler sehingga menghasilkan temperatur uap dan tekanan uap yang mampu memutar turbin uap. Turbin uap berfungsi sebagai prime mover untuk memutar generator sehingga menghasilkan output berupa daya listrik. Pada saat menggunakan bahan bakar cangkang PLTU 6 MW menghasilkan ouput rata – rata sebesar 4.8 MW/hr dan dalam 1 MW output membutuhkan 1.02 ton cangkang dan pada saat menggunakan bahan bakar fibre PLTU 6 MW menghasilkan output rata – rata 2.3 MW/hr dan dalam 1 MW output membutuhkan 1.83 ton fibre. Karena lebih optimal dalam pengoperasian serta maksimalnya output yang dihasilkan dari bahan bakar cangkang, maka efisiensinya pun lebih baik. Efisiensi PLTU 6 MW pada saat menggunakan bahan bakar cangkang sebesar 20.5 % dan efisiensi PLTU 6 MW dari bahan bakar fibre 13 %. Oleh karena itu bahan bakar cangkang merupakan bahan bakar utama yang digunakan pada PLTU 6 MW.

  16. A GIS policy approach for assessing the effect of fertilizers on the quality of drinking and irrigation water and wellhead protection zones (Crete, Greece).

    Science.gov (United States)

    Kourgialas, Nektarios N; Karatzas, George P; Koubouris, Georgios C

    2017-03-15

    Fertilizers have undoubtedly contributed to the significant increase in yields worldwide and therefore to the considerable improvement of quality of life of man and animals. Today, attention is focussed on the risks imposed by agricultural fertilizers. These effects include the dissolution and transport of excess quantities of fertilizer major- and trace-elements to the groundwater that deteriorate the quality of drinking and irrigation water. In this study, a map for the Fertilizer Water Pollution Index (FWPI) was generated for assessing the impact of agricultural fertilizers on drinking and irrigation water quality. The proposed methodology was applied to one of the most intensively cultivated with tree crops area in Crete (Greece) where potential pollutant loads are derived exclusively from agricultural activities and groundwater is the main water source. In this region of 215 km 2 , groundwater sampling data from 235 wells were collected over a 15-year time period and analyzed for the presence of anionic (ΝΟ -3 , PO -3 4 ) and cationic (K +1 , Fe +2 , Mn +2 , Zn +2 , Cu +2 , B +3 ) fertilizer trace elements. These chemicals are the components of the primary fertilizers used in local tree crop production. Eight factors/maps were considered in order to estimate the spatial distribution of groundwater contamination for each fertilizer element. The eight factors combined were used to generate the Fertilizer Water Pollution Index (FWPI) map indicating the areas with drinking/irrigation water pollution due to the high groundwater contamination caused by excessive fertilizer use. Moreover, by taking into consideration the groundwater flow direction and seepage velocity, the pathway through which groundwater supply become polluted can be predicted. The groundwater quality results show that a small part of the study area, about 8 km 2 (3.72%), is polluted or moderately polluted by the excessive use of fertilizers. Considering that in this area drinking water sources

  17. Model for economical analysis of oil and gas deepwater production concepts : Comparisons of life cycle cost of subsea production systems vs. floating structures with dry wellheads.

    OpenAIRE

    Romero Mata, Omar

    2010-01-01

    Master's thesis in Offshore technology The scope of the work was to create a model that will allow the comparison of Life Cycle Costs (LCC) for subsea production systems and floating structures with dry wellheads for the Mexican territorial waters of the Gulf of Mexico. To give validity to the model, an empirical comparison on the resulting recovery factor based on data of the US Gulf of Mexico was included. This comparison is intended to answer ¿Is there a significant diffe...

  18. Criteria for the provision and assembly of the rotor blades of a 300 MW low pressure steam turbine for electrical generation; Criterios para el suministro y ensambles de la alabes de rotor de turbina de vapor de 300 MW baja presion para generacion electrica

    Energy Technology Data Exchange (ETDEWEB)

    Bertin, Galo; Felix, Jorge A; Quijano, Octavio [Especialistas en Turbopartes, S.A. de C.V., Queretaro, Queretaro (Mexico)

    2007-11-15

    This paper presents some of the main criteria to consider from the inspection, disassembling and assembly of blades with different root types of a turbine rotor of steam turbines for power generation, having as an aim to count on a reliable rotor, fulfilling with the equipment original design and norms and international standards. [Spanish] Este trabajo presenta algunos de los criterios principales a considerar desde la inspeccion, desmontaje y montaje de alabes de diferentes tipos de raiz de un rotor de turbinas de vapor de generacion electrica, teniendo como finalidad contar con un rotor confiable, cumpliendo con el diseno original del equipo y con normas y estandares internacionales.

  19. Análisis de la redundancia en la generación de vapor con parámetros inferiores en un monobloque de 64 MW // Analysis of redundancy in the steam generation with inferior parameters in an unit of 64 MW.

    Directory of Open Access Journals (Sweden)

    A. Paneque Matos

    2000-10-01

    Full Text Available La necesidad del país de mantener la generación eléctrica a fin de evitar los cortes de servicio planificados e imprevistos,debido a la difícil situación económica actual, obliga a buscar soluciones que al menos sirvan de paliativo temporal a estadesagradable situación. En una central termoeléctrica ubicada en el perímetro de la ciudad, se presentó la situación de queproducto de un accidente, un bloque quedó sin turbogenerador, estando su generador de vapor en magníficas condicionesde explotación; y que otro bloque presentaba muchas salidas forzosas fuera de servicio producto de una insuficientereparación de su generador de vapor. La carencia de fondos para acometer una efectiva reparación, hizo pensar en elanálisis de la posibilidad de utilizar la caldera de una unidad para alimentar el turbogenerador de la otra. En el presentetrabajo se muestran los cálculos correspondientes para determinar aproximadamente el comportamiento de la turbina en lasnuevas condiciones impuestas, se realizó un análisis de fiabilidad del sistema propuesto y se utilizó la simulación comoherramienta para modelar el proceso.Palabras claves: centrales termoeléctricas, fiabilidad, eficiencia, turbina de gas, caldera._______________________________________________________________________Abstract:The necessity of Cuba to maintain the electric generation in order to avoid the interruption of service in planned oraccidental way, due to the difficult current economic situation, forces to solutions that at least serve for temporary palliativeto this unpleasant situation. In a thermoelectric power station located in the perimeter of the city, a situation was presenteddue to an accident, a block with fail in the turbogenerator and the steam generator in good conditions of exploitation; andthat another block, the No.7, presented many mandatory out of service product of an insufficient repair of its generator.This situation lead to analyze the possibility of

  20. Wet steam wetness measurement in a 10 MW steam turbine

    Directory of Open Access Journals (Sweden)

    Kolovratník Michal

    2014-03-01

    Full Text Available The aim of this paper is to introduce a new design of the extinction probes developed for wet steam wetness measurement in steam turbines. This new generation of small sized extinction probes was developed at CTU in Prague. A data processing technique is presented together with yielded examples of the wetness distribution along the last blade of a 10MW steam turbine. The experimental measurement was done in cooperation with Doosan Škoda Power s.r.o.

  1. The DAN-AERO MW Experiments

    DEFF Research Database (Denmark)

    Aagaard Madsen, Helge; Bak, Christian; Schmidt Paulsen, Uwe

    a number of coordinated, innovative measurements on full scale MW size rotors as well as on airfoils for MW size turbines in wind tunnels. Shear and turbulence inflow characteristics were measured on a Siemens 3.6 MW turbine with a five hole pitot tube. Pressure and turbulent inflow characteristics were...... on the blade was further instrumented with around 50 microphones for high frequency surface pressure measurements. The surface pressure measurements have been correlated with inflow measurements from four five hole pitot tubes and two sensors for measuring the high frequency (50 Hz to10 kHz) contents...

  2. Brief introduction to 60 MW CARR

    Energy Technology Data Exchange (ETDEWEB)

    Tonghua, Yang; Chuntang, Ye [China Inst. of Atomic Energy, Beijing BJ (China)

    1998-10-01

    CARR, a 60 MW reactor will be constructed at China Institute of Atomic Energy (CIAE). The reactor type, its safety features, core lay-out, fuel assemblies, main parameters designed, main applications of are briefly described. (author)

  3. 30 400 MW worldwide in early 2003

    International Nuclear Information System (INIS)

    Anon.

    2003-01-01

    Accounting for more than 74% of wind power output in the world, Europe is now more than ever the spearhead of the wind energy industry. First estimates for 2002 show a 6 000 MW progression that now places total world output around 30 400 MW, that is enough to electrify 17 million households. Nevertheless, although it's still growing at a remarkable speed, the rate of development for wind energy has slowed down for the first time in years. (authors)

  4. 1st DeepWind 5 MW Baseline design

    DEFF Research Database (Denmark)

    Schmidt Paulsen, Uwe; Vita, Luca; Aagaard Madsen, Helge

    2012-01-01

    The first 5MW baseline design of the DeepWind concept is presented for a Darrieus type floating wind turbine system for water depths of more than 150 m. This design will be used as design reference to test the next technological improvements of sub-component level, being based as much as possible...... trajectory on the water plane. The generator is placed at the bottom of the platform and uses 5MW direct drive technology.The conceptual design is evaluated with numerical simulations in the time domain using the aero-elastic code HAWC2. In order to investigate the concept, a double-disc blade element....... A site has been chosen for the floating turbine off Norway as representative for external conditions. The structure is verified according to an ultimate strength analysis, including loads from wind, waves and currents. The stability of the platform is investigated, considering the displacements...

  5. CW 100MW microwave power transfer in space

    International Nuclear Information System (INIS)

    Takayama, K.; Hiramatsu, S.; Shiho, M.

    1991-01-01

    A linear multistage MFEL has been considered as a possible power source for future linear colliders; however, the single-stage experiment cannot be straightforwardly extrapolated to the multistage MFEL. Nevertheless, extensive theoretical and computational studies have demonstrated the feasibility of multistaging. Based on the authors current understanding of the MFEL, they developed the idea of a circular microwave power station (MPS) driven with a single high current beam where many FEL stages are placed along a circle and the remarkable high power of microwave (mw) is generated at each stage. The total power produced is linearly proportional to the number of FEL stages. This huge mw power can be emitted from a large parabola antenna; propagates in space and can be received by a receiver such as parabola antenna or rectenna

  6. Probabilistic Risk Analysis and Fault Trees as Tools in Improving the Delineation of Wellhead Protection Areas: An Initial Discussion

    Science.gov (United States)

    Rodak, C. M.; Silliman, S. E.

    2010-12-01

    Delineation of a wellhead protection area (WHPA) is a critical component of managing / protecting the aquifer(s) supplying potable water to a public water-supply well. While a number of previous authors have addressed questions related to uncertainties in advective capture zones, methods for assessing WHPAs in the presence of uncertainty in the chemistry of groundwater contaminants, the relationship between land-use and contaminant sources, and the impact on health risk within the receiving population are more limited. Probabilistic risk analysis (PRA) combined with fault trees (FT) addresses this latter challenge by providing a structure whereby four key WHPA issues may be addressed: (i) uncertainty in land-use practices and chemical release, (ii) uncertainty in groundwater flow, (iii) variability in natural attenuation properties (and/or remediation) of the contaminants, and (iv) estimated health risk from contaminant arrival at a well. The potential utility of PRA-FT in this application is considered through a simplified case study involving management decisions related both to regional land use planning and local land-use zoning regulation. An application-specific fault tree is constructed to visualize and identify the events required for health risk failure at the well and a Monte Carlo approach is used to create multiple realizations of groundwater flow and chemical transport to a well in a model of a simple, unconfined aquifer. Model parameters allowed to vary during this simplified case study include hydraulic conductivity, probability of a chemical spill (related to land use variation in space), and natural attenuation through variation in rate of decay of the contaminant. Numerical results are interpreted in association with multiple land-use management scenarios as well as multiple cancer risk assumptions regarding the contaminant arriving at the well. This case study shows significant variability of health risk at the well, however general trends were

  7. TRIGA 14 MW Research Reactor Status and Utilization

    International Nuclear Information System (INIS)

    Barbos, D.; Ciocanescu, M.; Paunoiu, C.

    2016-01-01

    Institute for Nuclear Research is the owner of the largest family TRIGA research reactor, TRIGA14 MW research reactor. TRIGA14 MW reactor was designed to be operated with HEU nuclear fuel but now the reactor core was fully converted to LEU nuclear fuel. The full conversion of the core was a necessary step to ensure the continuous operation of the reactor. The core conversion took place gradually, using fuel manufactured in different batches by two qualified suppliers based on the same well qualified technology for TRIGA fuel, including some variability which might lead to a peculiar behaviour under specific conditions of reactor utilization. After the completion of the conversion a modernization program for the reactor systems was initiated in order to achieve two main objectives: safe operation of the reactor and reactor utilization in a competitive environment to satisfy the current and future demands and requirements. The 14 MW TRIGA research reactor operated by the Institute for Nuclear Research in Pitesti, Romania, is a relatively new reactor, commissioned 37 years ago. It is expected to operate for another 15-20 years, sustaining new fuel and testing of materials for future generations of power reactors, supporting radioisotopes production through the development of more efficient new technologies, sustaining research or enhanced safety, extended burn up and verification of new developments concerning nuclear power plants life extension, to sustain neutron application in physics research, thus becoming a centre for instruction and training in the near future. A main objective of the TRIGA14MW research reactor is the testing of nuclear fuel and nuclear material. The TRIGA 14 MW reactor is used for medical and industrial radioisotopes production ( 131 I, 125 I, 192 Ir etc.) and a method for 99 Mo- 99 Tc production from fission is under development. For nuclear materials properties investigation, neutron radiography methods have been developed in the INR. The

  8. The Grand Quevilly thermal test station - the SMW sodium circuit with a generator of superheated steam at 545 deg; Station d'essais thermiques de grand quevilly - circuit de sodium de 5 MW avec generateur de vapeur surchauffee a 545 deg

    Energy Technology Data Exchange (ETDEWEB)

    Robin, M G [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1964-07-01

    A 5 MW installation is described which is a reduced model of the heat exchange system of a sodium-cooled reactor. This plant, which is situated at Grand Quevilly (near Rouen), consists of: 1 - A primary sodium loop made up of a sodium re-heater running on heavy diesel oil, a mechanical pump and an intermediate exchanger made up of clusters of tubes fitted with baffles. 2 - A NaK(56 per cent of K) secondary loop consisting mainly of a mechanical pump and a double-wall steam generator with forced circulation and complete vaporization. 3 - A tertiary water loop consisting of the inside of the steam generator pipes, a pressure-reducing valve which cools down the super-heated fluid and acts as a turbine, a condenser, a charge-pump and a supply pump for the boiler. The heat is given finally to a water-source flowing into the Seine. Two important points of the installation are: - The water treatment unit - The control and regulation system Apart from the general satisfactory operation of the installation which it is hoped to obtain, a careful study will be made of the heat transmission coefficients of the important equipment such as the intermediate exchanger and the steam generator. The construction was finished on April 28, 1964. (author) [French] On decrit une installation de 5 MW figurant a echelle reduite un systeme de transfert de chaleur d'un reacteur refroidi au sodium. Cette installation, situee a Grand Quevilly (pres de Rouen) comprend: 1 - Une boucle de sodium primaire comportant un rechauffeur de sodium alimente en fuel lourd, une pompe mecanique et un echangeur intermediaire a faisceau tubulaire muni de chicanes, 2 - Une boucle de NaK (56% de K) secondaire dont les appareils principaux sont une pompe mecanique et un generateur de vapeur a double paroi, circulation forcee et vaporisation totale. 3 - une boucle tertiaire a eau comprenant l'interieur des tubes du generateur de vapeur, un detendeur-desurchauffeur simulant une turbine, un condenseur, une pompe de

  9. 12MW Horns Rev experiment[Wind farm

    Energy Technology Data Exchange (ETDEWEB)

    Hasager, C.B.; Pena, A; Mikkelsen, T.; Courtney, M.; Antoniou, I.; Gryning, S.-E.; Hansen, P. [Risoe National Lab., DTU, Wind Energy Dept. (Denmark); Soerensen, P.B. [DONG Energy (Denmark)

    2007-10-15

    The 12MW project with the full title '12 MW wind turbines: the scientific basis for their operation at 70 to 270 m height offshore' has the goal to experimentally investigate the wind and turbulence characteristics between 70 and 270 m above sea level and thereby establish the scientific basis relevant for the next generation of huge 12 MW wind turbines operating offshore. The report describes the experimental campaign at the Horns Rev offshore wind farm at which observations from Doppler Laser LIDAR and SODAR were collected from 3 May to 24 October 2006. The challenges for mounting and operating the instruments on the transformer platform at Horns Rev were overcome by a close collaboration between DONG energy and Risoe National Laboratory DTU. The site is presented. In particular, three tall offshore meteorological masts, up to 70 m tall, provided a useful source of meteorological data for comparison to the remotely sensed wind and turbulence observations. The comparison showed high correlation. The LIDAR and SODAR wind and turbulence observations were collected far beyond the height of the masts (up to 160 m above sea level) and the extended profiles were compared to the logarithmic wind profile. Further studies on this part of the work are on-going. Technical detail on LIDAR and SODAR are provided as well as theoretical work on turbulence and atmospheric boundary layer flow. Selected results from the experimental campaign are reported. (au)

  10. Weighted Average Cost of Retail Gas (WACORG) highlights pricing effects in the US gas value chain: Do we need wellhead price-floor regulation to bail out the unconventional gas industry?

    International Nuclear Information System (INIS)

    Weijermars, Ruud

    2011-01-01

    The total annual revenue stream in the US natural gas value chain over the past decade is analyzed. Growth of total revenues has been driven by higher wellhead prices, which peaked in 2008. The emergence of the unconventional gas business was made possible in part by the pre-recessional rise in global energy prices. The general rise in natural gas prices between 1998 and 2008 did not lower overall US gas consumption, but shifts have occurred during the past decade in the consumption levels of individual consumer groups. Industry's gas consumption has decreased, while power stations increased their gas consumption. Commercial and residential consumers maintained flat gas consumption patterns. This study introduces the Weighted Average Cost of Retail Gas (WACORG) as a tool to calculate and monitor an average retail price based on the different natural gas prices charged to the traditional consumer groups. The WACORG also provides insight in wellhead revenues and may be used as an instrument for calibrating retail prices in support of wellhead price-floor regulation. Such price-floor regulation is advocated here as a possible mitigation measure against excessive volatility in US wellhead gas prices to improve the security of gas supply. - Highlights: → This study introduces an average retail price, WACORG. → WACORG can monitor price differentials for the traditional US gas consumer groups. → WACORG also provides insight in US wellhead revenues. → WACORG can calibrate retail prices in support of wellhead price-floor regulation. → Gas price-floor can improve security of gas supply by reducing price volatility.

  11. The status of safeguarding 600 MW(e) CANDU reactors

    International Nuclear Information System (INIS)

    Von Baeckmann, A.; Rundquist, D.E.; Pushkarjov, V.; Smith, R.M.; Zarecki, C.W.

    1982-09-01

    There has been extensive work in the development of CANDU safeguards since the last International Conference on Nuclear Power, and this has resulted in the development of improved equipment for the safeguards system now being installed in the 600 MW(e) CANDU generating stations. The overall system is designed to improve on the existing IAEA safeguards and to provide adequate coverage for each plausible nuclear material diversion route. There is sufficient sensitivity and redundancy to enable the timely detection of the possible diversion of significant quantities of nuclear material

  12. Modeling and Simulation of a 12 MW Wind Farm

    Directory of Open Access Journals (Sweden)

    GROZA, V.

    2010-05-01

    Full Text Available The installation of wind turbines in power systems has developed rapidly through the last 20 years. In this paper a complete simulation model of a 6 x 2 MW wind turbines is presented using data from a wind farm installed in Denmark. A model of the wind turbine with cage-rotor induction generator is presented in details. A set of simulations are performed and they show that it is possible to simulate a complete wind farm from wind to the grid. The simulation tool can also be used to simulate bigger wind farms connected to the grid.

  13. 1-MW klystron for fusion plasma heating

    International Nuclear Information System (INIS)

    Okamoto, Tadashi; Miyake, Setsuo; Ohno, Hiroaki

    1985-01-01

    A plasma test apparatus to bring about the critical plasma conditions for nuclear fusion is now under construction in Japan Atomic Energy Research Institute. Among various means of plasma heating, the most promising is the lower hybrid resonance heating (LHRF) in the 2-GHz region. Although it has so far requied 7 to 8 MW of microwave power for the plasma test apparatus, the new klystron, E3778, now constructed by Toshiba has the world's highest output power of 1 MW in the 2-GHz region. In addition to the excellent high-power operation for 10 seconds, the wide operating frequency range of 1.7 to 2.26 GHz by dint of sophisticated high-speed tuning mechanism, and the high durability to reflected power of up to 2.0 of VSWR are the high-lighted features of this klystron, which have never been achieved by conventional klystrons. (author)

  14. Design of 100 MW LNG Floating Barge Power Plant

    Directory of Open Access Journals (Sweden)

    I Made Ariana

    2017-06-01

    Full Text Available Floating bargepower plant able to supply amount of electricity to undeveloped island in Indonesia. In this research, the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulation floating bargepower plant able to supply amount of electricity to undeveloped island in Indonesia. In this research, the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulation Normal 0 false false false EN-US X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;}

  15. Multi-technology control centre to integrate 460 MW renewables

    International Nuclear Information System (INIS)

    2016-01-01

    The new RWE Innogy Aersa Control Centre that has been certified to act as an interface with CECRE (the Renewable Energy Control Centre) since February 2015, connects RWE’s 20 renewable energy facilities with REE, the Spanish Electricity Grid. As a result, it ensures that wind farms, in addition to hydropower and solar plants, can inject the energy generated by its 460 MW installed safely and with no penalties. Green Eagle Solutions, a provider of software solutions for renewable energy companies, has collaborated with RWE in the development of this Control Centre, meeting the high standards of quality and safety required by RWE. This centre uses CompactSCADA® technology to integrate power generation facilities that need to be integrated in a Control Centre to communicate with REE’s CECRE. (Author)

  16. 60-MW test using the 30-MW klystrons for the KEKB project

    Science.gov (United States)

    Fukuda, S.; Michizono, S.; Nakao, K.; Saito, Y.; Anami, S.

    1995-07-01

    The B-Factory is a future plan, requiring an energy upgrade of the KEK linac from 2.5 GeV to 8.0 GeV (KEKB Project). This paper describes the recent development of an S-band high-power pulse klystron to be used as the PF-linac rf-source of the B-Factory. This tube is a modified version of the existing 30-MW tube, which produces 51 MW at a 310 kV beam voltage by optimizing the focusing magnetic field. In order to increase the reliability, the cathode diameter, the gun housing, and the insulation ceramic-seal were enlarged. This tube was redesigned so as to have the same characteristics as the test results of 30-MW tubes at a higher applied voltage without changing the rf interaction region. Four prototype tubes have been manufactured; final test results showed that these new tubes produce an output power of more than 50 MW at 310 kV with an efficiency of 46%. Recently this tube has produced more than 60 MW at a 350 kV beam voltage for a demonstration test. A comparison between the FCI-code prediction and the test results is also given in this paper.

  17. Economic Development Impact of 1,000 MW of Wind Energy in Texas

    Energy Technology Data Exchange (ETDEWEB)

    Reategui, S.; Hendrickson, S.

    2011-08-01

    Texas has approximately 9,727 MW of wind energy capacity installed, making it a global leader in installed wind energy. As a result of the significant investment the wind industry has brought to Texas, it is important to better understand the economic development impacts of wind energy in Texas. This report analyzes the jobs and economic impacts of 1,000 MW of wind power generation in the state. The impacts highlighted in this report can be used in policy and planning decisions and can be scaled to get a sense of the economic development opportunities associated with other wind scenarios. This report can also inform stakeholders in other states about the potential economic impacts associated with the development of 1,000 MW of new wind power generation and the relationships of different elements in the state economy.

  18. 1000 MW steam turbine for Temelin nuclear power station

    International Nuclear Information System (INIS)

    Drahy, J.

    1992-01-01

    Before the end 1991 the delivery was completed of the main parts (3 low-pressure sections and 1 high-pressure section, all of double-flow design) of the first full-speed (3000 r.p.m.) 1000 MW steam turbine for saturated admission steam for the Temelin nuclear power plant. Description of the turbine design and of new technologies and tools used in the manufacture are given. Basic technical parameters of the steam turbine are as follows: maximum output of steam generators 6060 th -1 ; maximum steam flow into turbine 5494.7 th -1 ; output of turbo-set 1024 MW; steam conditions before the turbine inlet: pressure 5.8 MPa, temperature 273.3 degC, steam wetness 0.5%; nominal temperature of cooling water 21 degC; temperature of feed water 220.8 degC; maximum consumption of heat from turbine for heating at 3-stage heating of heating water 60/150 degC. (Z.S.) 7 figs., 2 refs

  19. MW-Class Electric Propulsion System Designs

    Science.gov (United States)

    LaPointe, Michael R.; Oleson, Steven; Pencil, Eric; Mercer, Carolyn; Distefano, Salvador

    2011-01-01

    Electric propulsion systems are well developed and have been in commercial use for several years. Ion and Hall thrusters have propelled robotic spacecraft to encounters with asteroids, the Moon, and minor planetary bodies within the solar system, while higher power systems are being considered to support even more demanding future space science and exploration missions. Such missions may include orbit raising and station-keeping for large platforms, robotic and human missions to near earth asteroids, cargo transport for sustained lunar or Mars exploration, and at very high-power, fast piloted missions to Mars and the outer planets. The Advanced In-Space Propulsion Project, High Efficiency Space Power Systems Project, and High Power Electric Propulsion Demonstration Project were established within the NASA Exploration Technology Development and Demonstration Program to develop and advance the fundamental technologies required for these long-range, future exploration missions. Under the auspices of the High Efficiency Space Power Systems Project, and supported by the Advanced In-Space Propulsion and High Power Electric Propulsion Projects, the COMPASS design team at the NASA Glenn Research Center performed multiple parametric design analyses to determine solar and nuclear electric power technology requirements for representative 300-kW class and pulsed and steady-state MW-class electric propulsion systems. This paper describes the results of the MW-class electric power and propulsion design analysis. Starting with the representative MW-class vehicle configurations, and using design reference missions bounded by launch dates, several power system technology improvements were introduced into the parametric COMPASS simulations to determine the potential system level benefits such technologies might provide. Those technologies providing quantitative system level benefits were then assessed for technical feasibility, cost, and time to develop. Key assumptions and primary

  20. 34 GHz, 45 MW pulsed magnicon

    International Nuclear Information System (INIS)

    Nezhevenko, Oleg A.; LaPointe, Michael A.; Yakovlev, Vyacheslav P.; Hirshfield, Jay L.; Serdobintsev, Gennady V.; Kuznetsov, Gennady I.; Persov, Boris Z.; Fix, Alexander

    2002-01-01

    A high efficiency, high power magnicon at 34.272 GHz has been designed and built as a microwave source to develop RF technology for a future multi-TeV electron-positron linear collider. The tube is designed to provide a peak output power of ∼45 MW in a 1 microsecond pulse, with a gain of 55 dB, using a 500 kV, 220 A, 1 mm-diameter electron beam. The status of the tube itself as well as the near-term experimental program is presented

  1. A five MW nuclear heating reactor

    International Nuclear Information System (INIS)

    Zhang Dafang; Don Duo; Su Quingshan

    1997-01-01

    The 5 MW Nuclear Heating Reactor (NHR-5) developed and designed by the Institute of Nuclear Energy and Technology (INET) and has been operated for four winter seasons since 1989. During the time of commissioning and operation a number of experiments including self-stability, self-regulation and simulation of ATWS etc. were carried out. Some operating experiences such as water chemistry, radiation protection, and environmental impacts and so on, were also obtained at the same time. All of these demonstrate that the design of NHR-5 is successful. (author)

  2. PLC control of 50 MW klystron modulators

    International Nuclear Information System (INIS)

    Shang Lei; Liu Gongfa; Chen Liping; Lu Yeming; Hong Jun; Zhang Yi; Zhao Feng

    2004-01-01

    Upgrade project of the 50 MW klystron modulators of Hefei Light Source (HLS) was firstly introduced. PLC control system of modulators was employed to replace the old control and monitor system, which was based on relay logic circuit and manual operation method. the PLC system becomes a sub system of the new EPICS control system of HLS. Constant-current, switch-mode and high voltage power supplies were adopted to replace the old 50 Hz power supplies. The technology of modulators was improved and operation was more reliable. The design method, hardware and software of PLC control of modulators were described and the performance was presented. (authors)

  3. GE will finance 614-MW cogeneration plant

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    The General Electric Power Funding Corporation, a unit of GE Capital, will provide up to $870 million in construction and permanent financing, and letters of credit to Cogen Technologies of Houston, Texas. The agreement will fund the construction of a 614-megawatt (MW), combined-cycle cogeneration plant to be built in Linden, New Jersey, and for the purchase of gas properties. The plant will be owned by Cogen Technologies. The financing is one of the largest packages ever for a cogeneration plant, GE said

  4. Operating experience with 600 MW steam turbosets

    International Nuclear Information System (INIS)

    Tinapp, J.

    1978-01-01

    The turbosets of the 600 MW line are machines with 4 casing, with a single-flow high-pressure turbine, a double-flow MD part, and two double-flow low-pressure turbines. The common design of all BBC turbosets of this size is explained, with a few remarks on the typical constructional features of BBC technology. The plant has a mean availability of 96% and a mean forced shutdown rate of 1.2%. A table gives a survey of the start-up procedure and the operating results so far. (GL) [de

  5. Extrapolation of the Dutch 1 MW tunable free electron maser to a 5 MW ECRH source

    International Nuclear Information System (INIS)

    Caplan, M.; Nelson, S.; Kamin, G.; Antonsen, T. Levush, B.; Urbanus, W.; Tulupov, A.

    1995-01-01

    A Free Electron Maser (FEM) is now under construction at the FOM Institute (Rijnhuizen) Netherlands with the goal of producing 1 MW long pulse to CW microwave output in the range 130 GHz to 250 GHz with wall plug efficiencies of 50% (Verhoeven, et al EC-9 Conference). An extrapolated version of this device is proposed which by scaling up the beam current, would produce microwave power levels of up to 5 MW CW in order to reduce the cost per watt and increase the power per module, thus providing the fusion community with a practical ECRH source

  6. Design Optimization of a 5 MW Floating Offshore Vertical-axis Wind Turbine

    NARCIS (Netherlands)

    Paulsen, Uwe Schmidt; Madsen, Helge Aagård; Hattel, Jesper Henri; Baran, Ismet; Nielsen, Per Hørlyck

    2013-01-01

    This paper outlines results of a proposed layout of a light 2-bladed rotor, with a driving torque constraint matching the generator design, and shows details of the pultruded blade – and rotor geometry. In comparison with the 1st baseline design of a 5 MW VAWT concept this present development

  7. Impact of modulation strategies on power devices loading for 10 MW multilevel wind power converter

    DEFF Research Database (Denmark)

    Blaabjerg, Frede; Isidori, Andrea; Rossi, Fabio Mario

    2012-01-01

    This paper focuses on the control and modulation of a three-level Neutral Point Clamped (3L-NPC) back-to-back full scale converter for a 10 MW direct-drive wind turbine, equipped with a Permanent Magnet Synchronous Generator (PMSG). Emphasis is oriented towards the investigation of the power losses...

  8. Non-polluting steam generators with fluidized-bed furnaces

    Energy Technology Data Exchange (ETDEWEB)

    Brandes, H [Deutsche Babcock A.G., Oberhausen (Germany, F.R.)

    1979-07-01

    The author reports on a 35 MW steam generator with hard coal fluidized-bed furnace a planned 35 MW steam generator with flotation-dirt fluidized-bed furnace, and on planned steam generators for fluidized-bed firing of hard coal up to a steam power of about 200 MW.

  9. Integration of A Solid Oxide Fuel Cell into A 10 MW Gas Turbine Power Plant

    Directory of Open Access Journals (Sweden)

    Denver F. Cheddie

    2010-04-01

    Full Text Available Power generation using gas turbine power plants operating on the Brayton cycle suffers from low efficiencies. In this work, a solid oxide fuel cell (SOFC is proposed for integration into a 10 MW gas turbine power plant, operating at 30% efficiency. The SOFC system utilizes four heat exchangers for heat recovery from both the turbine outlet and the fuel cell outlet to ensure a sufficiently high SOFC temperature. The power output of the hybrid plant is 37 MW at 66.2% efficiency. A thermo-economic model predicts a payback period of less than four years, based on future projected SOFC cost estimates.

  10. Target station design for a 1 MW pulsed spallation neutron source

    International Nuclear Information System (INIS)

    Russell, G.J.; Baker, G.D.; Brewton, R.J.

    1993-01-01

    Target stations are vital components of the 1 MW, next generation spallation neutron source proposed for LANSCE. By and large, target stations design determines the overall performance of the facility. Many traditional concepts will probably have to be rethought, and many new concepts will have to be put forward to meet the 1 MW challenge. This article gives a brief overview of the proposed neutron spallation source from the target station viewpoint, as well as the general philosophy adopted for the design of the LANSCE-II target stations. Some of the saliant concepts and features envisioned for LANSCE-II are briefly described

  11. TG 220 MW hydraulic control system diagnostics

    International Nuclear Information System (INIS)

    Svabcik, A.

    1996-01-01

    The TG power output control system comprises a hydraulic and an electronic part. TG speed, power output or the main steam header pressure (HPK) depend on the steam flow at the turbine inlet. The steam admission into the turbine is controlled by four control valves and one by-pass valve in case of the HP part and by four capture flap valves in case of the LP part. The task of the SKODA K-220 MW turbine protection and control systems is to provide both the turbine speed and power output control to the setpoint value. Diagnostic measurements were aimed at getting an overview of both technical and functional states of all power output control elements. Principally, it can be stated that some deficiencies of a design nature originating from the manufacturer's factory were revealed and some other deficiencies related to hydraulic control elements functionality were identified more closely by the new method. 5 figs

  12. TG 220 MW hydraulic control system diagnostics

    Energy Technology Data Exchange (ETDEWEB)

    Svabcik, A [Atomova Elektraren Bohunice, Jaslovske Bohunice (Slovakia)

    1997-12-31

    The TG power output control system comprises a hydraulic and an electronic part. TG speed, power output or the main steam header pressure (HPK) depend on the steam flow at the turbine inlet. The steam admission into the turbine is controlled by four control valves and one by-pass valve in case of the HP part and by four capture flap valves in case of the LP part. The task of the SKODA K-220 MW turbine protection and control systems is to provide both the turbine speed and power output control to the setpoint value. Diagnostic measurements were aimed at getting an overview of both technical and functional states of all power output control elements. Principally, it can be stated that some deficiencies of a design nature originating from the manufacturer`s factory were revealed and some other deficiencies related to hydraulic control elements functionality were identified more closely by the new method. 5 figs.

  13. Maintenance of French 900 MW PWR plants

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    This paper presents the doctrine and the aims of maintenance of EDF in the next few years. With an average age of 3.5 years, France's 900 MW PWRs, which now total 31, have overcome their growing pains. During the next few years EDF is aiming for a sharp increase in the availability factor of these plants which make up most of its nuclear thermal capacity, a reduction in the number of emergency outages, as great a cut back as possible in the period of programmed outages and the bringing down of the doses received by staff to the lowest possible level. Eventually the idea is to extend the operating life of plants as much as possible, perhaps to 40 or 50 years [fr

  14. Hypothetical accident scenario analyses for a 250-MW(t) modular high temperature gas-cooled reactor

    International Nuclear Information System (INIS)

    Harrington, R.M.; Ball, S.J.; Cleveland, J.C.

    1985-11-01

    This paper describes calculations performed to characterize the inherent safety of a 250-MW(t), 100-MW(e), pebble bed modular high temperature gas-cooled reactor (HTGR) design with vertical in-line arrangement (i.e., upflow core with steam generators directly above the core). A variety of postulated accident sequences involving combinations of loss of forced primary coolant (helium) circulation, loss of primary coolant pressurization, and loss of heat sink were studied and were discussed

  15. Experimental study of a 1 MW, 170 GHz gyrotron oscillator

    Science.gov (United States)

    Kimura, Takuji

    A detailed experimental study is presented of a 1 MW, 170 GHz gyrotron oscillator whose design is consistent with the ECH requirements of the International Thermonuclear Experimental Reactor (ITER) for bulk heating and current drive. This work is the first to demonstrate that megawatt power level at 170 GHz can be achieved in a gyrotron with high efficiency for plasma heating applications. Maximum output power of 1.5 MW is obtained at 170.1 GHz in 85 kV, 50A operation for an efficiency of 35%. Although the experiment at MIT is conducted with short pulses (3 μs), the gyrotron is designed to be suitable for development by industry for continuous wave operation. The peak ohmic loss on the cavity wall for 1 MW of output power is calculated to be 2.3 kW/cm2, which can be handled using present cooling technology. Mode competition problems in a highly over-moded cavity are studied to maximize the efficiency. Various aspects of electron gun design are examined to obtain high quality electron beams with very low velocity spread. A triode magnetron injection gun is designed using the EGUN simulation code. A total perpendicular velocity spread of less than 8% is realized by designing a low- sensitivity, non-adiabatic gun. The RF power is generated in a short tapered cavity with an iris step. The operating mode is the TE28,8,1 mode. A mode converter is designed to convert the RF output to a Gaussian beam. Power and efficiency are measured in the design TE28,8,1 mode at 170.1 GHz as well as the TE27,8,1 mode at 166.6 GHz and TE29,8,1 mode at 173.5 GHz. Efficiencies between 34%-36% are consistently obtained over a wide range of operating parameters. These efficiencies agree with the highest values predicted by the multimode simulations. The startup scenario is investigated and observed to agree with the linear theory. The measured beam velocity ratio is consistent with EGUN simulation. Interception of reflected beam by the mod-anode is measured as a function of velocity ratio

  16. Development of a 5 MW reference gearbox for offshore wind turbines: 5 MW reference gearbox

    Energy Technology Data Exchange (ETDEWEB)

    Nejad, Amir Rasekhi [Norwegian Research Center for Offshore Wind Technology, Norwegian University of Science and Technology, Trondheim Norway; Center for Ships and Ocean Structures, Norwegian University of Science and Technology, Trondheim Norway; Guo, Yi [National Wind Technology Center, National Renewable Energy Laboratory, Golden Colorado USA; Gao, Zhen [Center for Ships and Ocean Structures, Norwegian University of Science and Technology, Trondheim Norway; Moan, Torgeir [Norwegian Research Center for Offshore Wind Technology, Norwegian University of Science and Technology, Trondheim Norway; Center for Ships and Ocean Structures, Norwegian University of Science and Technology, Trondheim Norway

    2015-07-27

    This paper presents detailed descriptions, modeling parameters and technical data of a 5MW high-speed gearbox developed for the National Renewable Energy Laboratory offshore 5MW baseline wind turbine. The main aim of this paper is to support the concept studies and research for large offshore wind turbines by providing a baseline gearbox model with detailed modeling parameters. This baseline gearbox follows the most conventional design types of those used in wind turbines. It is based on the four-point supports: two main bearings and two torque arms. The gearbox consists of three stages: two planetary and one parallel stage gears. The gear ratios among the stages are calculated in a way to obtain the minimum gearbox weight. The gearbox components are designed and selected based on the offshore wind turbine design codes and validated by comparison to the data available from large offshore wind turbine prototypes. All parameters required to establish the dynamic model of the gearbox are then provided. Moreover, a maintenance map indicating components with high to low probability of failure is shown. The 5 MW reference gearbox can be used as a baseline for research on wind turbine gearboxes and comparison studies. It can also be employed in global analysis tools to represent a more realistic model of a gearbox in a coupled analysis.

  17. Magnetohydrodynamic (MHD) power generation

    International Nuclear Information System (INIS)

    Chandra, Avinash

    1980-01-01

    The concept of MHD power generation, principles of operation of the MHD generator, its design, types, MHD generator cycles, technological problems to be overcome, the current state of the art in USA and USSR are described. Progress of India's experimental 5 Mw water-gas fired open cycle MHD power generator project is reported in brief. (M.G.B.)

  18. Capturing the Biofuel Wellhead and Powerhouse: The Chloroplast and Mitochondrial Genomes of the Leguminous Feedstock Tree Pongamia pinnata

    OpenAIRE

    Kazakoff, Stephen H.; Imelfort, Michael; Edwards, David; Koehorst, Jasper; Biswas, Bandana; Batley, Jacqueline; Scott, Paul T.; Gresshoff, Peter M.

    2012-01-01

    Pongamia pinnata (syn. Millettia pinnata) is a novel, fast-growing arboreal legume that bears prolific quantities of oil-rich seeds suitable for the production of biodiesel and aviation biofuel. Here, we have used Illumina® 'Second Generation DNA Sequencing (2GS)' and a new short-read de novo assembler, SaSSY, to assemble and annotate the Pongamia chloroplast (152,968 bp; cpDNA) and mitochondrial (425,718 bp; mtDNA) genomes. We also show that SaSSY can be used to accurately assemble 2GS data,...

  19. Remote Triggering of the Mw 6.9 Hokkaido Earthquake as a Result of the Mw 6.6 Indonesian Earthquake on September 11, 2008

    Directory of Open Access Journals (Sweden)

    Cheng-Horng Lin

    2012-01-01

    Full Text Available Only just recently, the phenomenon of earthquakes being triggered by a distant earthquake has been well established. Yet, most of the triggered earthquakes have been limited to small earthquakes (M < 3. Also, the exact triggering mechanism for earthquakes is still not clear. Here I show how one strong earthquake (Mw = 6.6 is capable of triggering another (Mw = 6.9 at a remote distance (~4750 km. On September 11, 2008, two strong earthquakes with magnitudes (Mw of 6.6 and 6.9 hit respectively in Indonesia and Japan within a short interval of ~21 minutes time. Careful examination of broadband seismograms recorded in Japan shows that the Hokkaido earthquake occurred just as the surface waves generated by the Indonesia earthquake arrived. Although the peak dynamic stress estimated at the focus of the Hokkaido earthquake was just reaching the lower bound for the capability of triggering earthquakes in general, a more plausible mechanism for triggering an earthquake might be attributed to the change of a fault property by fluid infiltration. These observations suggest that the Hokkaido earthquake was likely triggered from a remote distance by the surface waves generated from the Indonesia earthquake. If some more cases can be observed, a temporal warning of possible interaction between strong earthquakes might be concerned in the future.

  20. The DIII-D 3 MW, 110 GHz ECH System

    International Nuclear Information System (INIS)

    Callis, R.W.; Lohr, J.; Ponce, D.; O'Neill, R.C.; Prater, R.; Luce, T.C.

    1999-01-01

    Three 110 GHz gyrotrons with nominal output power of 1 MW each have been installed and are operational on the DIII-D tokamak. One gyrotron is built by Gycom and has a nominal rating of 1 MW and a 2 s pulse length, with the pulse length being determined by the maximum temperature allowed on the edge cooled Boron Nitride window. The second and third gyrotrons were built by Communications and Power Industries (CPI). The first CPI gyrotron uses a double disc FC-75 cooled sapphire window which has a pulse length rating of 0.8 s at 1 MW, 2s at 0.5 MW and 10s at 0.35 MW. The second CPI gyrotron, utilizes a single disc chemical-vapor-deposition diamond window, that employs water cooling around the edge of the disc. Calculation predict that the diamond window should be capable of full 1 MW cw operation. All gyrotrons are connected to the tokamak by a low-loss-windowless evacuated transmission line using circular corrugated waveguide for propagation in the HEl 1 mode. Each waveguide system incorporates a two mirror launcher which can steer the rf beam poloidally from the center to the outer edge of the plasma. Central current drive experiments with the two gyrotrons with 1.5 MW of injected power drove about 0.17 MA. Results from using the three gyrotron systems will be reported as well as the plans to upgrade the system to 6 MW

  1. Delineation of a wellhead protection zone and determination of flowpaths from potential groundwater contaminant source areas at Camp Ripley, Little Falls, Minnesota.

    Energy Technology Data Exchange (ETDEWEB)

    Quinn, J. J.; Environmental Science Division

    2006-12-22

    Groundwater at Camp Ripley, Minnesota, is recharged both on post and off site and discharged to rivers, wetlands, and pumping wells. The subsurface geologic materials have a wide range of permeabilities and are arranged in a complex fashion as a result of the region's multiple glacial advances. Correlation of individual glacial geologic units is difficult, even between nearby boreholes, because of the heterogeneities in the subsurface. This report documents the creation of a numerical model of groundwater flow for Camp Ripley and hydrologically related areas to the west and southwest. The model relies on a hydrogeological conceptual model built on the findings of a University of Minnesota-Duluth drilling and sampling program conducted in 2001. Because of the site's stratigraphic complexity, a geostatistical approach was taken to handle the uncertainty of the subsurface correlation. The U.S. Geological Survey's MODFLOW code was used to create the steady-state model, which includes input data from a variety of sources and is calibrated to water levels in monitoring wells across much of the site. This model was used for several applications. Wellhead protection zones were delineated for on-site production wells H, L, and N. The zones were determined on the basis of a probabilistic assessment of the groundwater captured by these wells; the assessment, in turn, had been based on multiple realizations of the study area's stratigraphy and groundwater flowfield. An additional application of the model was for estimating flowpaths and times of travel for groundwater at Camp Ripley's range areas and waste management facilities.

  2. Reliability, resilience and vulnerability criteria for the evaluation of time-dependent health risks: A hypothetical case study of wellhead protection

    Science.gov (United States)

    Rodak, C. M.; Silliman, S. E.; Bolster, D.

    2012-12-01

    consideration of potential health impact, allows for more informed, health-based decisions regarding zoning for wellhead protection.

  3. Capturing the biofuel wellhead and powerhouse: the chloroplast and mitochondrial genomes of the leguminous feedstock tree Pongamia pinnata.

    Science.gov (United States)

    Kazakoff, Stephen H; Imelfort, Michael; Edwards, David; Koehorst, Jasper; Biswas, Bandana; Batley, Jacqueline; Scott, Paul T; Gresshoff, Peter M

    2012-01-01

    Pongamia pinnata (syn. Millettia pinnata) is a novel, fast-growing arboreal legume that bears prolific quantities of oil-rich seeds suitable for the production of biodiesel and aviation biofuel. Here, we have used Illumina® 'Second Generation DNA Sequencing (2GS)' and a new short-read de novo assembler, SaSSY, to assemble and annotate the Pongamia chloroplast (152,968 bp; cpDNA) and mitochondrial (425,718 bp; mtDNA) genomes. We also show that SaSSY can be used to accurately assemble 2GS data, by re-assembling the Lotus japonicus cpDNA and in the process assemble its mtDNA (380,861 bp). The Pongamia cpDNA contains 77 unique protein-coding genes and is almost 60% gene-dense. It contains a 50 kb inversion common to other legumes, as well as a novel 6.5 kb inversion that is responsible for the non-disruptive, re-orientation of five protein-coding genes. Additionally, two copies of an inverted repeat firmly place the species outside the subclade of the Fabaceae lacking the inverted repeat. The Pongamia and L. japonicus mtDNA contain just 33 and 31 unique protein-coding genes, respectively, and like other angiosperm mtDNA, have expanded intergenic and multiple repeat regions. Through comparative analysis with Vigna radiata we measured the average synonymous and non-synonymous divergence of all three legume mitochondrial (1.59% and 2.40%, respectively) and chloroplast (8.37% and 8.99%, respectively) protein-coding genes. Finally, we explored the relatedness of Pongamia within the Fabaceae and showed the utility of the organellar genome sequences by mapping transcriptomic data to identify up- and down-regulated stress-responsive gene candidates and confirm in silico predicted RNA editing sites.

  4. Capturing the biofuel wellhead and powerhouse: the chloroplast and mitochondrial genomes of the leguminous feedstock tree Pongamia pinnata.

    Directory of Open Access Journals (Sweden)

    Stephen H Kazakoff

    Full Text Available Pongamia pinnata (syn. Millettia pinnata is a novel, fast-growing arboreal legume that bears prolific quantities of oil-rich seeds suitable for the production of biodiesel and aviation biofuel. Here, we have used Illumina® 'Second Generation DNA Sequencing (2GS' and a new short-read de novo assembler, SaSSY, to assemble and annotate the Pongamia chloroplast (152,968 bp; cpDNA and mitochondrial (425,718 bp; mtDNA genomes. We also show that SaSSY can be used to accurately assemble 2GS data, by re-assembling the Lotus japonicus cpDNA and in the process assemble its mtDNA (380,861 bp. The Pongamia cpDNA contains 77 unique protein-coding genes and is almost 60% gene-dense. It contains a 50 kb inversion common to other legumes, as well as a novel 6.5 kb inversion that is responsible for the non-disruptive, re-orientation of five protein-coding genes. Additionally, two copies of an inverted repeat firmly place the species outside the subclade of the Fabaceae lacking the inverted repeat. The Pongamia and L. japonicus mtDNA contain just 33 and 31 unique protein-coding genes, respectively, and like other angiosperm mtDNA, have expanded intergenic and multiple repeat regions. Through comparative analysis with Vigna radiata we measured the average synonymous and non-synonymous divergence of all three legume mitochondrial (1.59% and 2.40%, respectively and chloroplast (8.37% and 8.99%, respectively protein-coding genes. Finally, we explored the relatedness of Pongamia within the Fabaceae and showed the utility of the organellar genome sequences by mapping transcriptomic data to identify up- and down-regulated stress-responsive gene candidates and confirm in silico predicted RNA editing sites.

  5. 60-MW/sub t/ methanation plant design for HTGR process heat

    International Nuclear Information System (INIS)

    Davis, C.R.; Arcilla, N.T.; Hui, M.M.; Hutchins, B.A.

    1982-07-01

    This report describes a 60 MW(t) Methanation Plant for generating steam for industrial applications. The plant consists of four 15 MW(t) methanation trains. Each train is connected to a pipeline and receives synthesis gas (syngas) from a High Temperature Gas-Cooled Reactor Reforming (HTGR-R) plant. Conversion of the syngas to methane and water releases exothermic heat which is used to generate steam. Syngas is received at the Methanation Plant at a temperature of 80 0 F and 900 psia. One adiabatic catalytic reactor and one isothermal catalytic reactor, in each methanation train, converts the syngas to 92.2% (dry bases) methane. Methane and condensate are returned at temperatures of 100 to 125 0 F and at pressures of 860 to 870 psia to the HTGR-R plant for the reproduction of syngas

  6. Update on the modernization of 200 MW hard coal power plants in Poland

    International Nuclear Information System (INIS)

    Szabo, T.E.; Kopec, M.

    1993-01-01

    In June 1990, the Coalition of 200 MW, Hard Coal, Polish Power Plants representing an installed base of 10,240 MW, including 45 units of 200 MW, signed an agreement with the Westinghouse Electric Corporation, Power Generation Business Unit, based in Orlando, Florida, to cooperate on developing a modernization program for the 200 MW units. Program funding was obtained with The United States Trade Development Program (TDP) providing approximately 2/3 of the cost, and the balance provided by Westinghouse. On March 5, 1992, the Polish-American (51% Westinghouse, 49% Seven (7) Hard Coal Power Plants), Joint Venture Company, MODELPOL, Ltd. (Polish acronym for 'MODernizacja ELektrowni POLskich' or Modernization of Polish Power Plants) was established with the goal to implement not only technically but financially the recommendations of the Modernization Study. The mission given MODELPOL, Ltd. by their Polish-American Shareholders was to: develop the specific modernization programs for each hard coal power plant; assist in identifying and obtaining the financial resources required for implementation; and provide technological preventative maintenance services to improve unit availability. Within these aims was the target to reduce SO 2 , and particulate emissions. The first program is taking place at the Laziska Power Plant, followed by Rybnik. Further projects are in the planning stages. Finance is a constant problem, this should be eased by the restructuring of the power industry. Future programmes include connection to the European Community Power Grid. 5 figs

  7. HPP Boshkov Most - upgrading of the design installed capacity from 45 MW to 70 MW

    International Nuclear Information System (INIS)

    Pavleski, Vlatko; Jakimova Filipovska, Nevenka; Ivanova-Davidovicj, Jasna

    2007-01-01

    HPP Boshkov Most location will be near the town of Debar, accessible from Mavrovo-Debar road. This procject involves the tributaries that combine to make up the Mala Reka, the biggest tributary to Radika river. The watershed area is characterized as having high mountains and rich watercourses, without major settlements. The hydro system consists of: The Tresonche reservoir with 44 m high dam, with an intake to head race tunnel, also additional intakes linked by a system siphons, covered channels collect the waters from high mountains and deliver their flow to the head race tunnel. The head race tunnel ends with surge shaft and penstocks to the powerhouse. In this paper will be given differences between the Main Design prepared by HEP - Skopje in 1983, where the installed capacity is 45 MW and feasibility Study prepared by Pall C. Rizzo Ass., where installed capacity is suggested to be 70 MW, thru enlarged nominal discharge - from 14 m 3 /s to 22 m 3 /s. (Author)

  8. The new 6 MW industrial gas turbine from MAN; Die neue 6 MW Industriegasturbine von MAN

    Energy Technology Data Exchange (ETDEWEB)

    Beukenberg, M.; Wiedermann, A.; Orth, U.; Aschenbruck, E.; Reiss, F. [MAN Diesel und Turbo SE, Oberhausen (Germany)

    2010-07-01

    The development of a completely new series of gas turbines requires significant capital, resources and know-how. MAN Diesel and Turbo strategically decided to create a small gas turbine in the 6 MW-class. The construction of the Gas Turbine has been on the basis of opportunities in current and future markets and the positioning of the competition, this has determined the characteristics and technical parameters which have been optimised in the 6 MW design. The construction uses extremely high precision engineering so that the assembly of sub-components to modules is a smooth flowing process and can guarantee the high standards both quality and performance which MAN Diesel and Turbo are operating to. The individual components must be tested and thoroughly validated many months before actual assembly of the first machine. These include in particular the compressor of the gas turbine and the combustion chamber. The combustion system required special attention, since the emissions are strongly focused to satisfy stringent environmental requirements. The planned tests are a prerequisite for the construction of such a prototype and must be successfully completed before the Gas Turbine will be accepted into service. (orig.)

  9. Stein industrie moisture separator reheaters in 900 MW and 1300 MW PWR units behaviour and feedback

    International Nuclear Information System (INIS)

    Guignard, S.; Gabrel, J.; Marceau, J.; Gauchet, J.P.

    1990-01-01

    Various metallurgical investigations were carried out with a view to making technological modifications to the Stein Industrie designed moisture separator reheaters of the 900 MW CP0/CP1 and 1300 MW P4/P'4 plant series. Dismantling and assessment of four reheater bundles from the CP0/CP1 plants revealed tube leaks at the bends and in the straight part of the bundle due chiefly to erosion-corrosion. In addition, thickness losses due to the same phenomenon were observed on the inner walls of the vessels and internal hardware in contact with wet steam. The assessments and inspections carried out in the field on the MSR bundles of the CP0 and CP1 plants confirmed the presence of erosion-corrosion, virtually stabilized to date, and revealed fouling of bends by sequestration of particles in the circuit with presence of some pitting. Fatigue cracking of the last support plate of certain MSRs of the CP0 series was also revealed. Adoption of finned tubes of 18% chrome ferritic stainless steel (Z 2 CT 18) for spare bundles and new MSRs, protection of vessels by austenitic and/or martensitic stainless steel internal hardware, modification of water conditioning in the steam-water circuit, and implementation of some technological modifications should guarantee the longterm resistance of the MSRs [fr

  10. HPP Boshkov Most - upgrading the designed installed capacity from 45 MW to 70 MW

    International Nuclear Information System (INIS)

    Pavleski, Vlatko; Jakimova-Filipovska, Nevenka; Ivanova-Davidovikj, Jasna

    2004-01-01

    HPP Boskov Most location will be near the town of Debar, accessible from the Mavrovo-Debar road. This Project involves the tributaries that combine to make tip the Mala Reka, the biggest tributary to Radika river. The watershed area is characterized as having high mountains and rich watercourses, without major settlements. The hydro system consists of: The Tresonce Reservoir with 44 m high dam, with an intake to a head race tunnel, also additional intakes linked by a system of siphons, covered channels collect the waters from high mountains and deliver their flow to the head- race tunnel. The head race tunnel ends with surge shaft and pen stock to the powerhouse. In this paper will be given differences between the Main Design prepared by HEP - Skopje in 1983, where the installed capacity is 45 MW and Feasibility Study prepared by Paul C. Rizzo Ass., where installed capacity is suggested to be 70 MW through enlarged nominal discharge - from 14 m 3 /s to 22 m 3 /s. (Author)

  11. Power Devices Loading in Multilevel Converters for 10 MW Wind Turbines

    DEFF Research Database (Denmark)

    Ma, Ke; Blaabjerg, Frede; Xu, Dehong

    2011-01-01

    Several promising multilevel converter solutions for 10 MW wind turbines using permanent magnet synchronous generators are proposed, designed and compared both with one-stage gear-box drive and direct drive systems. The current and loss distributions, as well as the utilization of power devices......-level NeutralPoint-Clamped topology with both the direct-drive and one-stage gear box drive systems....

  12. Construction, completion, and testing of replacement monitoring wells MW 3-2, MW 6-2, MW 7-2, and MW 11-2, Mountain Home Air Force Base, Idaho, February through April 2000

    Science.gov (United States)

    Parliman, D.J.

    2000-01-01

    In February and March 2000, the U.S. Geological Survey Western Regional Research Drilling Operation constructed replacement monitoring wells MW 3–2, MW 6–2, MW 7–2, and MW 11–2 as part of a regional ground-water monitor- ing network for the Mountain Home Air Force Base, Elmore County, Idaho. Total well depths ranged from 435.5 to 456.5 feet, and initial depth-to-water measurements ranged from about 350 to 375 feet below land surface. After completion, wells were pumped and onsite measurements were made of water temperature, specific conductance, pH, and dissolved oxygen. At each well, natural gamma, spontaneous potential, resistivity, caliper, and temperature logs were obtained from instruments placed in open boreholes. A three- dimensional borehole flow analysis was completed for MW 3–2 and MW 11–2, and a video log was obtained for MW 11–2 to annotate lithology and note wet zones in the borehole above saturated rock.

  13. Engineering design of the EURISOL multi-MW spallation target

    CERN Document Server

    Herrera-Martínez, A; Ashrafi-Nik, M; Samec, K; Freibergs, J; Platacis, E

    2007-01-01

    The European Isotope Separation On-Line Radioactive Ion Beam project (EURISOL) is set to design the 'next-generation' European Isotope Separation On-Line (ISOL) Radioactive Ion Beam (RIB) facility. It will extend and amplify current research on nuclear physics, nuclear astrophysics and fundamental interactions beyond the year 2010. In EURISOL, four target stations are foreseen, three direct targets of approximately 100 kW of beam power and one multi-MW target assembly, all driven by a high-power particle accelerator. In this high power target station, high-intensity RIBs of neutron-rich isotopes will be obtained by inducing fission in several actinide targets surrounding a liquid metal spallation neutron source. This article summarises the work carried out within Task 2 of the EURISOL Design Study, with special attention to the coupled neutronics of the mercury proton-to-neutron converter and the fission targets. The overall performance of the facility, which will sustain fast neutron fluxes of the order of 1...

  14. Pre-feasibility study of 80mw onshore wind farm

    International Nuclear Information System (INIS)

    Almas, M.S.

    2014-01-01

    This paper discusses a pre-feasibility study of 80MW onshore wind farm in the KPK (Khyber Pakhtunkhwa) province previously known as NWFP (North West Frontier) Province of Pakistan. The realistic data of wind speed is collected from Laboratory of Meteorology and Climatology (University of the Punjab) to study the feasibility of wind farm. Detailed analysis of wind turbines from four different manufacturers is carried out together with justifications of selecting a particular wind turbine. Issues related to site selection, wind farm civil foundation, recommendations for a particular choice of tower along with environmental effects are presented. Wind data analysis is carried out by using WINDROSE PRO software to determine the resultant direction of wind at the selected site for wind farm layout. The wind distribution at hub height of the wind turbine is calculated and is used to compute annual power production by the wind farm using power curves of the wind turbine. Electrical network integration issues of wind farm to the external grid are studied and the optimum point of connection is proposed. Finally, economic analysis of the whole wind farm project depending upon the LCC (Life Cycle Cost Analysis) is presented and the feasibility of the project from the investor's point of view is identified. The study concludes that the cost per kilowatt hour of electricity generated by this wind power plant will be 10.4 PKR/kWh and the payback period for the whole project is about 11.2 years. (author)

  15. Feasibility study of a 1-MW pulsed spallation source

    International Nuclear Information System (INIS)

    Cho, Y.; Chae, Y.C.; Crosbie, E.

    1995-01-01

    A feasibility study of a 1-MW pulsed spallation source based on a rapidly cycling proton synchrotron (RCS) has been completed. The facility consists of a 400-MeV HP - linac, a 30-Hz RCS that accelerates the 400-MeV beam to 2 GeV, and two neutron-generating target stations. The design time-averaged current of the accelerator system is 0.5 mA, or 1.04x1014 protons per pulse. The linac system consists of an H - ion source, a 2-MeV RFQ, a 70-MeV DTL and a 330-MeV CCL. Transverse phase space painting to achieve a Kapchinskij-Vladimirskij (K-V) distribution of the injected particles in the RCS is accomplished by charge exchange injection and programming of the closed orbit during injection. The synchrotron lattice uses FODO cells of ∼90 degrees phase advance. Dispersion-free straight sections are obtained by using a missing magnet scheme. Synchrotron magnets are powered by a dual-frequency resonant circuit that excites the magnets at a 20-Hz rate and de-excites them at a 60-Hz rate, resulting in an effective rate of 30 Hz, and reducing the required peak rf voltage by 1/3. A key feature, of the design of this accelerator system is that beam losses are from injection to extraction, reducing activation to levels consistent with hands-on maintenance. Details of the study are presented

  16. Pre-Feasibility Study of 80MW Onshore Wind Farm

    Directory of Open Access Journals (Sweden)

    Muhammad Shoaib Almas

    2014-10-01

    Full Text Available This paper discusses a pre-feasibility study of 80MW onshore wind farm in the KPK (Khyber Pakhtunkhwa province previously known as NWFP (North West Frontier Province of Pakistan. The realistic data of wind speed is collected from Laboratory of Meteorology & Climatology (University of the Punjab to study the feasibility of wind farm. Detailed analysis of wind turbines from four different manufacturers is carried out together with justifications of selecting a particular wind turbine. Issues related to site selection, wind farm civil foundation, recommendations for a particular choice of tower along with environmental effects are presented. Wind data analysis is carried out by using WINDROSE PRO software to determine the resultant direction of wind at the selected site for wind farm layout. The wind distribution at hub height of the wind turbine is calculated and is used to compute annual power production by the wind farm using power curves of the wind turbine. Electrical network integration issues of wind farm to the external grid are studied and the optimum point of connection is proposed. Finally, economic analysis of the whole wind farm project depending upon the LCC (Life Cycle Cost Analysis is presented and the feasibility of the project from the investor?s point of view is identified. The study concludes that the cost per kilowatt hour of electricity generated by this wind power plant will be 10.4 PKR/kWh and the payback period for the whole project is about 11.2 years

  17. Distributed generation with photovoltaic systems: A utility perspective

    International Nuclear Information System (INIS)

    Vigotti, R.

    1998-01-01

    Today PV power systems are already cost-effective and commonly employed in a wide range of remote applications such as electricity supply to isolated users and small communities; water pumping and desalination; powering of service equipment such as radio repeaters; pipelines and well-heads cathodic protection. PV systems can easily cover a broad range of power requirements, allowing them to take advantage of new niche markets as they develop. Besides such applications a ''non-power'', low performance, consumer market also exists (watches, calculators, gadgets) that has already reached a stable growth condition. In the last decade, an increase has been experienced of about three times in the amount of module shipments (103 MW expected in 1997), a more balanced regional manufacturer share has developed, crystalline technology has maintained its lead, and a more market-oriented application share has appeared (at present most applications are for stand-alone)

  18. Revitalization of Tuzla Thermal Power Plant's Unit 3 (100 MW)

    International Nuclear Information System (INIS)

    Sakovic, A.; Praso, N.

    1998-01-01

    Power Plant Revitalization is a highly ranged concept essentially aimed at continued operations of the generating unit at, or near, rated capacities for the rest of the economic life of the plant or even for an extended life. In essence, the need to rehabilitate may arise due to reasons such as low availability factor, low efficiency, increasing operating and maintenance costs, loss of reliability, drop in safety of plant and personnel, poor maintainability or environmental requirements. The term revitalization is therefore normally used in the context to cover the range of activities including repairing components, replacing equipment, modifying systems, adding new system and equipment and perhaps restoration to rated capacities. This exercise on already complex power generation process will naturally require the application of various technologies in order to ensure a safe and efficient installation of electricity supply. In normal conditions of producing and consumption of electricity (load demands) in order to answer the question of what kind of revitalization to undertake it is necessary to state at the very beginning: - whether it is necessary, from the point of equipment wear-out, to revitalize all equipment at once (one-phase revitalization), or - whether it is possible to postpone the revitalization of a part of equipment for the next period (phased revitalization). Both concepts have some specific advantages and disadvantages. In essence the decision-making process between these two approaches, three basic conditions should be considered: technical-technological adequacy, energy-economy adequacy and financial adequacy. This paper covers general considerations, approach and methodology implemented during the revitalization the Tuzla Thermal Power Plant's Unit 3 (100MW) which was imposed by urgent demands of the Power System, the war conditions and financial possibilities including: - General data on TPP Tuzla and Unit 3 - Scope of work and economic effects

  19. IHEP S-band 45 MW pulse power klystron development

    International Nuclear Information System (INIS)

    Dong Dong; Zhou Zusheng; Zhang Liang; Li Gangying; Tian Shuangmin

    2006-01-01

    S-band 45 MW pulse power klystron has been developed in the Institute of High Energy Physics (IHEP) for the Beijing Electron Positron Collider (BEPC) upgrade projects (BEPC-II). This new klystron has 5 cavities in its RF-beam interaction and single RF output window, and the RF output power is 45 MW at 310 kV, the gain is 50 dB, the efficiency 40%. The manufacturing, training and testing of a prototype klystron has been finished in IHEP and RF power 45 MW at 300 kV has been reached. The testing results show that all the parameters of the 45 MW klystron reach the design goal. (authors)

  20. Changes in 900 MW PWR alarm processing policy

    Energy Technology Data Exchange (ETDEWEB)

    Pont, M [Electricite de France, Generation and Transmission, Nuclear Power Plant Operations, Paris (France)

    1997-09-01

    Following a brief description of the current 900 MW PWR alarm processing system, this document presents the feasibility study carried out within the scope of the Instrumentation and Control Refurbishment project (R2C). (author). 4 figs, tabs.

  1. Changes in 900 MW PWR alarm processing policy

    International Nuclear Information System (INIS)

    Pont, M.

    1997-01-01

    Following a brief description of the current 900 MW PWR alarm processing system, this document presents the feasibility study carried out within the scope of the Instrumentation and Control Refurbishment project (R2C). (author). 4 figs, tabs

  2. Thermal-hydraulic design of the 200 MW NHR

    International Nuclear Information System (INIS)

    Li Jincai; Gao Zuying; Xu Baocheng; He Junxiao

    1997-01-01

    The thermal hydraulic design of the 200-MW Nuclear Heating Reactor (NHR), design criteria, design methods, important characteristics and some development results are presented in this paper. (author). 5 refs, 8 figs, 2 tabs

  3. Light Rotor: The 10-MW reference wind turbine

    DEFF Research Database (Denmark)

    Bak, Christian; Bitsche, Robert; Yde, Anders

    2012-01-01

    design show a rather well performing wind turbine both in terms of power and loads, but in the further work towards the final design the challenges in the control needs to be solved and the balance between power performance and loads and between structural performance and mass will be investigated......This paper describes the design of a rotor and a wind turbine for an artificial 10-MW wind turbine carried out in the Light Rotor project. The turbine called the Light Rotor 10-MW Reference Wind Turbine (LR10-MW RWT), is designed with existing methods and techniques and serves as a reference...... like the determination of the specific power and upscaling of the turbine. The design of Iteration #2 of the LR10-MW RWT is carried out in a sequence between aerodynamic rotor design, structural design and aero-servo-elastic design. Each of these topics is described. The results from the Iteration #2...

  4. Thermal-hydraulic design of the 200 MW NHR

    Energy Technology Data Exchange (ETDEWEB)

    Jincai, Li; Zuying, Gao; Baocheng, Xu; Junxiao, He [Institute of Nuclear Energy and Technology, Tsingua Univ., Beijing (China)

    1997-09-01

    The thermal hydraulic design of the 200-MW Nuclear Heating Reactor (NHR), design criteria, design methods, important characteristics and some development results are presented in this paper. (author). 5 refs, 8 figs, 2 tabs.

  5. The Los Alamos 600 MJ, 1500 MW inertial energy storage and pulsed power unit

    International Nuclear Information System (INIS)

    Boenig, H.J.

    1991-01-01

    A 1430 MVA synchronous generator from a cancelled nuclear power plant has been installed and commissioned at Los Alamos National Laboratory (LANL) to be used as the pulsed power generator for physics experiments. The generator is mounted on a spring foundation to prevent dynamic forces from being transmitted to the substructure and into the ground. A 6 MW load-commutated inverter drive accelerates the machine from standstill to the maximum operating speed of 1800 rpm and from 1260 rpm to 1800 rpm between load pulses. The generator cooling method has been changed from hydrogen to air cooling to facilitate operation. A current limiting fuse, with a fuse clearing current of 90 kA, will protect the generator output against short circuit currents. An overview of the installation is presented. The paper also addresses the overload capability of the generator for pulsed loads. 7 figs., 1 tab

  6. The 140 GHZ, 1 MW Gyrotron - Status and Recent Results

    Science.gov (United States)

    Gantenbein, G.; Dammertz, G.; Illy, S.; Kern, S.; Leonhardt, W.; Piosczyk, B.; Schmid, M.; Thumm, M.; Braune, H.; Erckmann, V.; Laqua, H. P.; Michel, G.; Kasparek, W.; Lechte, C.; Legrand, F.; Lievin, C.; Prinz, O.

    2009-04-01

    A 10 MW ECRH system is currently under construction for the stellarator W7-X which will be built up and operated by IPP in Greifswald, Germany. The present status of the complete system is reported in [1]. The RF power will be provided by 10 gyrotrons. A European collaboration has been established to develop and build the 10 gyrotrons each with an output power of 1 MW for continuous wave (CW) operation [2]. Nine gyrotrons are being manufactured by Thales Electron Devices (TED), Vélizy, France, one gyrotron was produced by CPI, Palo Alto, CA and passed the acceptance tests at IPP. The acceptance tests of the TED gyrotrons are performed at the test stand at FZK and on site at IPP. The first series tube yielded a total output power of 0.98 MW, with an efficiency of 31 % (without a single stage depressed collector) in short pulse operation and of 0.92 MW in pulses of 1800 s (efficiency of almost 45 % at a depression voltage of 29 kV) [3], The Gaussian mode output power was 0.91 MW. The RF power, measured in a calorimetric load at the end of a 25 m long quasi-optical transmission line with seven mirrors, was 0.87 MW. In this contribution typical results of the next series gyrotrons will be reported.

  7. Design and field operation of 1175 MW steam turbine for Ohi Nuclear Power Station

    International Nuclear Information System (INIS)

    Hirota, Yoshio; Nakagami, Yasuo; Fujii, Hisashi; Shibanai, Hirooki.

    1980-01-01

    Two 1175 MW steam turbine and generator units have been successfully in commercial operation since March 1979 and December 1979 respectively at Ohi Nuclear Power Station of the Kansai Electric Power Company. Those units, the largest in their respective outputs in Japan, have also such remarkable design features as two-stage reheat, nozzle governing turbine, water cooled generator stator and turbine-driven feedwater pumps. This paper covers design features and some topics of various pre-operational tests of the above-mentioned units. (author)

  8. Design and field operation of 1175 MW steam turbine for Ohi Nuclear Power Station

    International Nuclear Information System (INIS)

    Hirota, Y.; Nakagami, Y.; Fujii, H.; Shibanai, H.

    1980-01-01

    Two 1,175 MW steam turbine and generator units have been successfully in commercial operation since March 1979 and December 1979 respectively at Ohi Nuclear Power Station of the Kansai Electric Power Company. Those units, the largest in their respective outputs in Japan, have also such remarkable design features as two-stage reheat, nozzle governing turbine, water cooled generator stator and turbine-driven feedwater pumps. This paper covers design features and some topics of various pre-operational tests of the above-mentioned units. (author)

  9. Power quality issues of 3MW direct-driven PMSG wind turbine

    OpenAIRE

    Ahmed, IA; Zobaa, AF; Taylor, GA

    2015-01-01

    This paper presents power quality issues of a grid connected wind generation system with a MW-class direct-driven permanent magnet synchronous generator (PMSG). A variable speed wind turbine model was simulated and developed with the simulation tool of PSCAD/EMTDC. The model includes a wind turbine with one mass-model drive train model, a PMSG model and a full-scale voltage source back to back PWM converter. The converter controller model is employed in the dq-synchronous rotating reference f...

  10. A Two-Bladed Teetering Hub configuration for the DTU 10 MW RWT: loads considerations

    DEFF Research Database (Denmark)

    Bergami, Leonardo; Aagaard Madsen, Helge; Rasmussen, Flemming

    2014-01-01

    study on an alternative downwind two-bladed rotor configuration. The study is based on a model representative of next generation multi-MW wind turbines: the DTU 10-MW Reference Wind Turbine (RWT). As a first design iteration, the aerodynamic characteristics of the original rotor are maintained......As the size of wind turbine rotors continuously grows, the need for innovative solutions that would yield to lighter rotor configurations becomes more urgent. Traditional wind turbine designs have favored the classic three-bladed upwind rotor configuration. This work presents instead a concept...... in load variations, and hence in fatigue damage, affects the turbine blades, shaft and tower, and originates from the aerodynamic unbalance on the rotor, as well as from aeroelastic interaction with the tower frequency. To mitigate the load amplification caused by the interaction between the tower...

  11. Special technology with high safety-related standards for the repair of the wellhead damage of a gas filled cavern at storage site Stassfurt; Spezialtechnologie mit hohen Sicherheitsvorkehrungen zur Beseitigung des Bohrlochkopfschadens einer Gaskaverne des Kavernenspeichers Stassfurt

    Energy Technology Data Exchange (ETDEWEB)

    Walden, S.; Klafki, M. [ESK-Erdgasspeicher Kalle GmbH, Freiberg (Germany)

    2008-11-15

    For the completion of the cavern Stassfurt S 106 which was leached by the so called ''solution mining under gas'' technology, the leaching strings 6 5/8''-4 1/2'' should be pulled out by using a snubbing unit. Due to an unexpected damage at the wellhead, the job could not be realized as projected. Therefore the snubbing work was stopped. For solving the technical damage different repair concepts were investigated, for example partial flooding of the cavern with brine or water, sealing of wellhead components by freezing or cutting of the lower leaching string section and setting plugs afterwards. All concepts had been evaluated concerning feasibility and risks. The most favourable technology was selected on the basis of a comparison of pros and cons and was planned for realization according to a detailed working programme. The specialized contractors as well as the fire brigade have guaranteed the required safety measures. The essential planning and working steps will be described as well as the acquired experiences will be explained in the following section. Finally, it can be stated that all jobs were realized according to the projected programme and all involved persons perfectly worked with the special technologies. (orig.)

  12. Superconducting wind turbine generators

    DEFF Research Database (Denmark)

    Abrahamsen, Asger Bech; Mijatovic, Nenad; Seiler, Eugen

    2010-01-01

    , the main challenge of the superconducting direct drive technology is to prove that the reliability is superior to the alternative drive trains based on gearboxes or permanent magnets. A strategy of successive testing of superconducting direct drive trains in real wind turbines of 10 kW, 100 kW, 1 MW and 10......We have examined the potential of 10 MW superconducting direct drive generators to enter the European offshore wind power market and estimated that the production of about 1200 superconducting turbines until 2030 would correspond to 10% of the EU offshore market. The expected properties of future...... offshore turbines of 8 and 10 MW have been determined from an up-scaling of an existing 5 MW turbine and the necessary properties of the superconducting drive train are discussed. We have found that the absence of the gear box is the main benefit and the reduced weight and size is secondary. However...

  13. Fast 3D seismic wave simulations of 24 August 2016 Mw 6.0 central Italy earthquake for visual communication

    Directory of Open Access Journals (Sweden)

    Emanuele Casarotti

    2016-12-01

    Full Text Available We present here the first application of the fast reacting framework for 3D simulations of seismic wave propagation generated by earthquakes in the Italian region with magnitude Mw 5. The driven motivation is to offer a visualization of the natural phenomenon to the general public but also to provide preliminary modeling to expert and civil protection operators. We report here a description of this framework during the emergency of 24 August 2016 Mw 6.0 central Italy Earthquake, a discussion on the accuracy of the simulation for this seismic event and a preliminary critical analysis of the visualization structure and of the reaction of the public.

  14. Latest Results in SLAC 75-MW PPM Klystrons

    International Nuclear Information System (INIS)

    Sprehn, D.; Caryotakis, G.; Haase, A.; Jongewaard, E.; Laurent, L.; Pearson, C.; Phillips, R.

    2006-01-01

    75 MW X-band klystrons utilizing Periodic Permanent Magnet (PPM) focusing have been undergoing design, fabrication and testing at the Stanford Linear Accelerator Center (SLAC) for almost nine years. The klystron development has been geared toward realizing the necessary components for the construction of the Next Linear Collider (NLC). The PPM devices built to date which fit this class of operation consist of a variety of 50 MW and 75 MW devices constructed by SLAC, KEK (Tsukuba, Japan) and industry. All these tubes follow from the successful SLAC design of a 50 MW PPM klystron in 1996. In 2004 the latest two klystrons were constructed and tested with preliminary results reported at EPAC2004. The first of these two devices was tested to the full NLC specifications of 75 MW, 1.6 microseconds pulse length, and 120 Hz. This 14.4 kW average power operation came with a tube efficiency >50%. The most recent testing of these last two devices will be presented here. Design and manufacturing issues of the latest klystron, due to be tested by the Fall of 2005, are also discussed

  15. Evaluation and Ranking of Geothermal Resources for Electrical Generation or Electrical Offset in Idaho, Montana, Oregon and Washington. Volume II.

    Energy Technology Data Exchange (ETDEWEB)

    Bloomquist, R. Gordon

    1985-06-01

    This volume contains appendices on: (1) resource assessment - electrical generation computer results; (2) resource assessment summary - direct use computer results; (3) electrical generation (high temperature) resource assessment computer program listing; (4) direct utilization (low temperature) resource assessment computer program listing; (5) electrical generation computer program CENTPLANT and related documentation; (6) electrical generation computer program WELLHEAD and related documentation; (7) direct utilization computer program HEATPLAN and related documentation; (8) electrical generation ranking computer program GEORANK and related documentation; (9) direct utilization ranking computer program GEORANK and related documentation; and (10) life cycle cost analysis computer program and related documentation. (ACR)

  16. Green-diode-pumped femtosecond Ti:Sapphire laser with up to 450 mW average power.

    Science.gov (United States)

    Gürel, K; Wittwer, V J; Hoffmann, M; Saraceno, C J; Hakobyan, S; Resan, B; Rohrbacher, A; Weingarten, K; Schilt, S; Südmeyer, T

    2015-11-16

    We investigate power-scaling of green-diode-pumped Ti:Sapphire lasers in continuous-wave (CW) and mode-locked operation. In a first configuration with a total pump power of up to 2 W incident onto the crystal, we achieved a CW power of up to 440 mW and self-starting mode-locking with up to 200 mW average power in 68-fs pulses using semiconductor saturable absorber mirror (SESAM) as saturable absorber. In a second configuration with up to 3 W of pump power incident onto the crystal, we achieved up to 650 mW in CW operation and up to 450 mW in 58-fs pulses using Kerr-lens mode-locking (KLM). The shortest pulse duration was 39 fs, which was achieved at 350 mW average power using KLM. The mode-locked laser generates a pulse train at repetition rates around 400 MHz. No complex cooling system is required: neither the SESAM nor the Ti:Sapphire crystal is actively cooled, only air cooling is applied to the pump diodes using a small fan. Because of mass production for laser displays, we expect that prices for green laser diodes will become very favorable in the near future, opening the door for low-cost Ti:Sapphire lasers. This will be highly attractive for potential mass applications such as biomedical imaging and sensing.

  17. A 2 MW, CW, 170 GHz gyrotron for ITER

    International Nuclear Information System (INIS)

    Piosczyk, B.; Arnold, A.; Alberti, S.

    2003-01-01

    A 140 GHz gyrotron for CW operation is under development for the stellarator W7-X. With a prototype tube a microwave output power of about 0.9 MW has been obtained in pulses up to 180 s, limited by the capability of the high voltage power supply. The development work on coaxial cavity gyrotrons has demonstrated the feasibility of manufacturing of a 2 MW, CW 170 GHz tube that could be used for ITER. The problems specific to the coaxial arrangement have been investigated and all relevant information needed for an industrial realization of a coaxial gyrotron have been obtained in short pulse experiments (up to 17 ms). The suitability of critical components for a 2 MW, CW coaxial gyrotron has been studied and a first integrated design has been done. (author)

  18. 10 MW Supercritical CO2 Turbine Test

    Energy Technology Data Exchange (ETDEWEB)

    Turchi, Craig

    2014-01-29

    The Supercritical CO2 Turbine Test project was to demonstrate the inherent efficiencies of a supercritical carbon dioxide (s-CO2) power turbine and associated turbomachinery under conditions and at a scale relevant to commercial concentrating solar power (CSP) projects, thereby accelerating the commercial deployment of this new power generation technology. The project involved eight partnering organizations: NREL, Sandia National Laboratories, Echogen Power Systems, Abengoa Solar, University of Wisconsin at Madison, Electric Power Research Institute, Barber-Nichols, and the CSP Program of the U.S. Department of Energy. The multi-year project planned to design, fabricate, and validate an s-CO2 power turbine of nominally 10 MWe that is capable of operation at up to 700°C and operates in a dry-cooled test loop. The project plan consisted of three phases: (1) system design and modeling, (2) fabrication, and (3) testing. The major accomplishments of Phase 1 included: Design of a multistage, axial-flow, s-CO2 power turbine; Design modifications to an existing turbocompressor to provide s-CO2 flow for the test system; Updated equipment and installation costs for the turbomachinery and associated support infrastructure; Development of simulation tools for the test loop itself and for more efficient cycle designs that are of greater commercial interest; Simulation of s-CO2 power cycle integration into molten-nitrate-salt CSP systems indicating a cost benefit of up to 8% in levelized cost of energy; Identification of recuperator cost as a key economic parameter; Corrosion data for multiple alloys at temperatures up to 650ºC in high-pressure CO2 and recommendations for materials-of-construction; and Revised test plan and preliminary operating conditions based on the ongoing tests of related equipment. Phase 1 established that the cost of the facility needed to test the power turbine at its full power and temperature would exceed the planned funding for Phases 2 and 3. Late

  19. Ultra Clean 1.1MW High Efficiency Natural Gas Engine Powered System

    Energy Technology Data Exchange (ETDEWEB)

    Zurlo, James; Lueck, Steve

    2011-08-31

    Dresser, Inc. (GE Energy, Waukesha gas engines) will develop, test, demonstrate, and commercialize a 1.1 Megawatt (MW) natural gas fueled combined heat and power reciprocating engine powered package. This package will feature a total efficiency > 75% and ultra low CARB permitting emissions. Our modular design will cover the 1 – 6 MW size range, and this scalable technology can be used in both smaller and larger engine powered CHP packages. To further advance one of the key advantages of reciprocating engines, the engine, generator and CHP package will be optimized for low initial and operating costs. Dresser, Inc. will leverage the knowledge gained in the DOE - ARES program. Dresser, Inc. will work with commercial, regulatory, and government entities to help break down barriers to wider deployment of CHP. The outcome of this project will be a commercially successful 1.1 MW CHP package with high electrical and total efficiency that will significantly reduce emissions compared to the current central power plant paradigm. Principal objectives by phases for Budget Period 1 include: • Phase 1 – market study to determine optimum system performance, target first cost, lifecycle cost, and creation of a detailed product specification. • Phase 2 – Refinement of the Waukesha CHP system design concepts, identification of critical characteristics, initial evaluation of technical solutions, and risk mitigation plans. Background

  20. Modelling the economic impacts of 500 MW of wave power in Ireland

    International Nuclear Information System (INIS)

    Deane, J.P.; Dalton, G.; Ó Gallachóir, B.P.

    2012-01-01

    This paper investigates the impacts of including 500 MW of wave power into Ireland’s electricity generation portfolio in the year 2020. One year of detailed market simulations are undertaken to determine the impact on wholesale electricity prices, system operation costs and CO 2 emissions with and without this installed wave power under a number carbon prices assumptions. In both scenarios (with and without wave energy), Ireland’s installed renewable capacity is fixed such that 40% of Ireland’s electricity in 2020 is from renewable source. The likely revenue a wave energy device would earn in the market is also investigated and compared with what is required to achieve 500 MW installed capacity. It is shown that in general the inclusion of wave energy has a negligible effect on wholesale electricity prices, reduces total system cost in Ireland and can increase CO 2 emissions on the island of Ireland under certain carbon price assumptions. It is also shown the current REFIT for wave energy is adequate. - Highlights: ► We modelled the Irish Electricity Market in 2020 with and without 500 MW of wave energy. ► The inclusion of wave energy did not have a significant impact on system marginal prices. ► The inclusion of wave energy reduced total costs in the system relative to a wind only scenario. ► REFIT tariff remains an essential financial support for the nascent wave energy industry.

  1. Multi-technology control centre to integrate 460 MW renewables; Centro de control multitecnología para la integración de 460 MW renovables

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2016-07-01

    The new RWE Innogy Aersa Control Centre that has been certified to act as an interface with CECRE (the Renewable Energy Control Centre) since February 2015, connects RWE’s 20 renewable energy facilities with REE, the Spanish Electricity Grid. As a result, it ensures that wind farms, in addition to hydropower and solar plants, can inject the energy generated by its 460 MW installed safely and with no penalties. Green Eagle Solutions, a provider of software solutions for renewable energy companies, has collaborated with RWE in the development of this Control Centre, meeting the high standards of quality and safety required by RWE. This centre uses CompactSCADA® technology to integrate power generation facilities that need to be integrated in a Control Centre to communicate with REE’s CECRE. (Author)

  2. Aero-Elastic Optimization of a 10 MW Wind Turbine

    DEFF Research Database (Denmark)

    Zahle, Frederik; Tibaldi, Carlo; Verelst, David Robert

    2015-01-01

    This article describes a multi-disciplinary optimization and analysis tool for wind turbines that is based on the open-source framework OpenMDAO. Interfaces to several simulation codes have been implemented which allows for a wide variety of problem formulations and combinations of models....... In this article concurrent aeroelastic optimization of a 10 MW wind turbine rotor is carried out with respect to material distribution distribution and planform. The optimizations achieve up to 13% mass reduction while maintaining the same power production compared to the baseline DTU 10MW RWT....

  3. Superconducting wind turbine generators

    International Nuclear Information System (INIS)

    Abrahamsen, A B; Seiler, E; Zirngibl, T; Andersen, N H; Mijatovic, N; Traeholt, C; Pedersen, N F; Oestergaard, J; Noergaard, P B

    2010-01-01

    We have examined the potential of 10 MW superconducting direct drive generators to enter the European offshore wind power market and estimated that the production of about 1200 superconducting turbines until 2030 would correspond to 10% of the EU offshore market. The expected properties of future offshore turbines of 8 and 10 MW have been determined from an up-scaling of an existing 5 MW turbine and the necessary properties of the superconducting drive train are discussed. We have found that the absence of the gear box is the main benefit and the reduced weight and size is secondary. However, the main challenge of the superconducting direct drive technology is to prove that the reliability is superior to the alternative drive trains based on gearboxes or permanent magnets. A strategy of successive testing of superconducting direct drive trains in real wind turbines of 10 kW, 100 kW, 1 MW and 10 MW is suggested to secure the accumulation of reliability experience. Finally, the quantities of high temperature superconducting tape needed for a 10 kW and an extreme high field 10 MW generator are found to be 7.5 km and 1500 km, respectively. A more realistic estimate is 200-300 km of tape per 10 MW generator and it is concluded that the present production capacity of coated conductors must be increased by a factor of 36 by 2020, resulting in a ten times lower price of the tape in order to reach a realistic price level for the superconducting drive train.

  4. Improving 200 MW NDHR reactor protection system with GAL devices

    International Nuclear Information System (INIS)

    Shi Mingde; Li Duo; Xie Zhengguo

    1999-01-01

    The emergence of General Array Logic (GAL), a fairly new type of logic devices with the characteristics of user-definable logic functions, have led to a revolutionary change in the design of logical circuits. The improvements of the reactor protection system for the 200 MW nuclear district heating reactor (NDHR) using GAL are covered

  5. Design of the 1-Mw, 200-Ghz, Fom Fusion Fem

    NARCIS (Netherlands)

    Urbanus, W. H.; Best, R. W. B.; Bongers, W. A.; Vaningen, A. M.; Manintveld, P.; Sterk, A. B.; Verhoeven, A. G. A.; van der Wiel, M. J.; Caplan, M.; Bratman, V. L.; Denisov, G. G.; Varfolomeev, A. A.; Khlebnikov, A. S.

    1993-01-01

    The FOM Institute for Plasma Physics has obtained funding for the development of a 1 MW, long pulse, 140-250 GHz free-electron maser. The engineering design is presently being performed in an international collaboration. In this paper the main components of the free-electron maser, the electron beam

  6. Design and operation of 140 GHz gyrotron oscillators for power levels up to 1 MW CW

    Energy Technology Data Exchange (ETDEWEB)

    Jory, H.; Bier, R.; Craig, L.J.; Felch, K.; Ives, L.; Lopez, N.; Spang, S.

    1986-12-01

    Varian has designed and tested 140 GHz gyrotron oscillators that have generated output powers of 100 kW CW and 200 kW for 1 ms pulses. Upcoming tubes will be designed to operate at power levels of 200 kW CW and ultimately up to 1 MW CW. The important design considerations which are addressed in the higher power tubes include the design of the electron gun, interaction circuit, and output window. These issues will be discussed and the results of the earlier 140 GHz gyrotron work at Varian will be summarized.

  7. Statistical fault diagnosis of wind turbine drivetrain applied to a 5MW floating wind turbine

    DEFF Research Database (Denmark)

    Ghane, Mahdi; Nejad, Amir R.; Blanke, Mogens

    2016-01-01

    to prevent them to develop into failure, statistical change detection is used in this paper. The Cumulative Sum Method (CUSUM) is employed to detect possible defects in the downwind main bearing. A high fidelity gearbox model on a 5-MW spar-type wind turbine is used to generate data for fault-free and faulty...... conditions of the bearing at the rated wind speed and the associated wave condition. Acceleration measurements are utilized to find residuals used to indirectly detect damages in the bearing. Residuals are found to be nonGaussian, following a t-distribution with multivariable characteristic parameters...

  8. Design and operation of 140 GHz gyrotron oscillators for power levels up to 1 MW CW

    International Nuclear Information System (INIS)

    Jory, H.; Bier, R.; Craig, L.J.; Felch, K.; Ives, L.; Lopez, N.; Spang, S.

    1986-12-01

    Varian has designed and tested 140 GHz gyrotron oscillators that have generated output powers of 100 kW CW and 200 kW for 1 ms pulses. Upcoming tubes will be designed to operate at power levels of 200 kW CW and ultimately up to 1 MW CW. The important design considerations which are addressed in the higher power tubes include the design of the electron gun, interaction circuit, and output window. These issues will be discussed and the results of the earlier 140 GHz gyrotron work at Varian will be summarized

  9. Optimization of deterministic based design of the PWR 1000 MW by aid of PSA

    International Nuclear Information System (INIS)

    Feigel, A.; Fabian, H.

    1987-01-01

    PSA was used to optimize the determinstic based design of the PWR 1000 MW. For this three reference accidents which are known to be the covering ones from previous valuations were investigated in detail. On basis of these accidents the integral core damage frequency has been estimated to be about 2 E-5/a. This result reflects a sufficient safety level and thus the quality of the requirement which has to be used for the design. Nevertheless the influence of some plant modifications was estimated in addition. It shows that especially the consideration of a modul with a diverse power generator results in a more balanced design on an increased safety level. (orig.)

  10. TFTR generator load assessment

    International Nuclear Information System (INIS)

    Heck, F.M.

    1975-10-01

    Typical experimental load demands on the TFTR generators are illustrated based on the electrical characteristics of the field coils, the coil leads, the main bus work, the various auxiliary bus work, the rectifiers, and transformers. The generator MW capacities are shown to be adequate for the proposed experimental operations with allowances made for variations in the final designs. The generator MVA capacities are shown to be adequate provided portions of the TF and EF rectifiers are freewheeled at selected times

  11. Final stage of first supercritical 460MW{sub e} CFB boiler construction. First experience

    Energy Technology Data Exchange (ETDEWEB)

    Goral, Damian [Foster Wheeler Energia Polska (Poland); Ostrowski, Waldemar [PKE (Poland)

    2009-07-01

    Circulating fluidized bed (CFB) boiler technology has been growing in size and number over the past two decades and it has established its position as utility scale boiler technology. Plant sizes up to 300 MW{sub e} are in operation today and designs for larger boilers are being developed. The next natural step for CFB technology is to go for supercritical steam parameters and larger boiler sizes. A Polish utility company Poludniowy Koncern Energetyczny SA (PKE) placed an order to Foster Wheeler Energia Oy for a 460 MW{sub e} supercritical CFB boiler for their Lagisza power plant. Contract was signed at the end of year 2002 and the engineering work is now ongoing. This will be the first supercritical once-through CFB boiler in the world. A modern power plant is designed for high efficiency not only for economical reasons but also for enhanced environmental performance in terms of reduced emissions and quantity of ash generated due to lower fuel consumption. Cutting CO{sub 2} emissions is one of the main drivers. To achieve these goals, supercritical steam parameters have been applied. Now this technology is available also for CFB technology. This combines a high plant efficiency with the other well known benefits of CFB technology, such as: fuel flexibility, low emissions and high availability. The boiler design for 460 MW{sub e} Lagisza power plant utilizes low mass flux BENSON Vertical once-through technology developed and licensed by Siemens AG, Germany. CFB boiler with low and uniform furnace heat flux is extremely well suited for the Benson technology providing a stable operation of the boiler also during load changes and abnormal operation conditions. The paper describes the 460 MW{sub e} supercritical CFB boiler concept and presents the technical solutions of the boiler design with auxiliary equipment, as well as first experiences from boiler erection period and commissioning. In spite of achieving this remarkable milestone the development of the CFB

  12. Large superconducting wind turbine generators

    DEFF Research Database (Denmark)

    Abrahamsen, Asger Bech; Magnusson, Niklas; Jensen, Bogi Bech

    2012-01-01

    and the rotation speed is lowered in order to limit the tip speed of the blades. The ability of superconducting materials to carry high current densities with very small losses might facilitate a new class of generators operating with an air gap flux density considerably higher than conventional generators...... and thereby having a smaller size and weight [1, 2]. A 5 MW superconducting wind turbine generator forms the basics for the feasibility considerations, particularly for the YBCO and MgB2 superconductors entering the commercial market. Initial results indicate that a 5 MW generator with an active weight of 34...

  13. The DAN-AERO MW experiments. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Aagaard Madsen, H.; Bak, C.; Schmidt Paulsen, U.; Gaunaa, M. (Risoe DTU, Roskilde (Denmark)); Fuglsang, P. (LM Glasfiber, Kolding (Denmark)); Romblad, J.; Olesen, N.A. (Vestas Wind Systems, Ringkoebing (Denmark)); Enevoldsen, P.; Laursen, J. (Siemens Wind Power, Ballerup (Denmark)); Jensen, Leo (DONG Energy, Fredericia (Denmark))

    2010-09-15

    This report describes the DAN-AERO MW experiments carried out within a collaborative, three years research project between Risoe DTU and the industrial partners LM Glasfiber, Siemens Wind Power, Vestas Wind Systems A/S and the utility company DONG Energy. The main objective of the project was to establish an experimental data base which can provide new insight into a number of fundamental aerodynamic and aero-acoustic issues, important for the design and operation of MW size turbines. The most important issue is the difference between airfoil characteristics measured under 2D, steady conditions in a wind tunnel and the unsteady 3D flow conditions on a rotor. The different transition characteristics might explain some of the differences between the 2D and 3D airfoil data and the experiments have been set up to provide data on this subject. The overall experimental approach has been to carry out a number of coordinated, innovative measurements on full scale MW size rotors as well as on airfoils for MW size turbines in wind tunnels. Shear and turbulence inflow characteristics were measured on a Siemens 3.6 MW turbine with a five hole pitot tube. Pressure and turbulent inflow characteristics were measured on a 2MW NM80 turbine with an 80 m rotor. One of the LM38.8 m blades on the rotor was replaced with a new LM38.8 m blade where instruments for surface pressure measurements at four radial sections were build into the blade during the blade production process. Additionally, the outmost section on the blade was further instrumented with around 50 microphones for high frequency surface pressure measurements. The surface pressure measurements have been correlated with inflow measurements from four five hole pitot tubes and two sensors for measuring the high frequency (50 Hz to10 kHz) contents of the inflow turbulence. In parallel, 2D wind tunnel measurements on common airfoils for wind turbine applications have been conducted in three different wind tunnels at Delft

  14. Design Tool for Direct Drive Wind Turbine Generators

    DEFF Research Database (Denmark)

    Leban, Krisztina Monika

    . A comparison of the selected machine types in view of up-scaling to 20 [MW] was performed. As an example fitness criterion, the use of active materials for the generators was considered. Based on this, suggestions for 20 [MW] generators were made. The results are discussed and future work, directions......The current work offers a comparison of the proposed machine geometries for 6 [MW] direct drive wind generator candidates with the prospective of up scaling to 20MW. The suggestions are based on a design tool especially built for this investigation. The in-built flexibility of the design tool gives...

  15. Analysis of a 115MW, 3 shaft, helium Brayton cycle

    International Nuclear Information System (INIS)

    Pradeepkumar, K.N.

    2002-01-01

    This research theme is originated from a development project that is going on in South Africa, for the design and construction of a closed cycle gas turbine plant using gas-cooled reactor as the heat source to generate 115 MW of electricity. South African Power utility company, Eskorn, promotes this developmental work through its subsidiary called PBMR (Pebble Bed Modular Reactor). Some of the attractive features of this plant are the inherent and passive safety features, modular geometry, small evacuation area, small infrastructure requirements for the installation and running of the plant, small construction time, quick starting and stopping and also low operational cost. This exercise is looking at the operational aspects of a closed cycle gas turbine, the finding of which will have a direct input towards the successful development and commissioning of the plant. A thorough understanding of the fluid dynamics in this three-shaft system and its transient performance analysis were the two main objectives of this research work. A computer programme called GTSI, developed by a previous Cranfield University research student, has been used in this as a base programme for the performance analysis. Some modifications were done on this programme to improve its control abilities. The areas covered in the performance analysis are Start-up, Shutdown and Load ramping. A detailed literature survey has been conducted to learn from the helium Turbo machinery experiences, though it is very limited. A critical analysis on the design philosophy of the PBMR is also carried out as part of this research work. The performance analysis has shown the advantage, disadvantage and impact of various power modulation methods suggested for the PBMR. It has tracked the effect of the operations of the various valves included in the PBMR design. The start-up using a hot gas injection has been analysed in detail and a successful start region has been mapped. A start-up procedure is also written

  16. Design considerations of a MW-scale, high-efficiency, industrial-use, ultraviolet FEL amplifier

    International Nuclear Information System (INIS)

    Pagani, C.; Saldin, E.L.; Schneidmiller, E.A.; Yurkov, M.V.

    2000-01-01

    Theoretical and experimental work in free electron laser (FEL) physics, and the physics of particle accelerators over the last 10 years has pointed to the possibility of the generation of MW-level optical beams with laser-like characteristics in the ultraviolet (UV) spectral range. The concept is based on generation of the radiation in the master oscillator-power FEL amplifier (MOPA) configuration. The FEL amplifier concept eliminates the need for an optical cavity. As a result, there are no thermal loading limitations to increase the average output power of this device up to the MW-level. The problem of a tunable master oscillator can be solved with available conventional quantum lasers. The use of a superconducting energy-recovery linac could produce a major, cost-effective facility with wall plug power to output optical power efficiency of about 20% that spans wavelengths from the visible to the deep ultraviolet regime. The stringent electron beam qualities required for UV FEL amplifier operation can be met with a conservative injector design (using a conventional thermionic gun and subharmonic bunchers) and the beam compression and linear acceleration technology, recently developed in connection with high-energy linear collider and X-ray FEL programs

  17. Performance of a 150-MW S-band klystron

    International Nuclear Information System (INIS)

    Sprehn, D.; Phillips, R.M.; Caryotakis, G.

    1994-09-01

    As part of an international collaboration, the Stanford Linear Accelerator Center (SLAC) klystron group has designed, fabricated, and tested a 60-Hz, 3-μs, 150-MW S-band klystron built for Deutsches Elektronen Synchrotron (DESY). A test diode with a 535-kV, 700-A electron beam was constructed to verify the gun operation. The first klystron was built and successfully met design specifications. The 375-MW electron beam represents a new record for SLAC accelerator klystrons in terms of voltage, current, energy, and ruggedness of design. The rf output power is a 150% increase over the S-band tubes currently used in the two-mile-long linear accelerator at SLAC. This paper discusses design issues and experimental results of the diode and klystron

  18. Development of L-band, 10MW multi beam klystron

    International Nuclear Information System (INIS)

    Irikura, M.; Miyake, S.; Yano, A.; Kazakov, S.; Larionov, A.; Teryaev, V.; Chin, Y.H.

    2004-01-01

    A 10-MW, L-band multi beam klystron (MBK) for TESLA linear collider and TESLA XFEL has been under development at Toshiba Electron Tubes and Devices Co., Ltd. (TETD) in collaboration with KEK. The TESLA requires pulsed klystrons capable of 10 MW output power at 1300 MHz with 1.5 ms pulse length and a repetition rate of 10 pps. The MBK with 6 low-perveance beams in parallel enables us to operate at lower cathode voltage with higher efficiency. The design work has been accomplished and the fabrication is under way. We are going to start conditioning and testing of prototype no.0 in the middle of July 2004. The design overview will be presented. (author)

  19. Operation and maintenance of 1MW PUSPATI TRIGA reactor

    International Nuclear Information System (INIS)

    Adnan Bokhari; Mohammad Suhaimi Kassim

    2006-01-01

    The Malaysian Research Reactor, Reactor TRIGA PUSPATI (RTP) has been successfully operated for 22 years for various experiments. Since its commissioning in June 1982 until December 2004, the 1MW pool-type reactor has accumulated more than 21143 hours of operation, corresponding to cumulative thermal energy release of about 14083 MW-hours. The reactor is currently in operation and normally operates on demand, which is normally up to 6 hours a day. Presently the reactor core is made up of standard TRIAGA fuel element consists of 8.5 wt%, 12 wt% and 20 wt% types; 20%-enriched and stainless steel clad. Several measures such as routine preventive maintenance and improving the reactor support systems have been taken toward achieving this long successful operation. Besides normal routine utilization like other TRIGA reactors, new strategies are implemented for effective increase in utilization. (author)

  20. 100 GHz, 1 MW, CW gyrotron study program. Final report

    International Nuclear Information System (INIS)

    Felch, K.; Bier, R.; Caplan, M.; Jory, H.

    1983-09-01

    The results of a study program to investigate the feasibility of various approaches in designing a 100 GHz, 1 MW CW gyrotron are presented. A summary is given of the possible configurations for a high average power, high frequency gyrotron, including an historical survey of experimental results which are relevant to the various approaches. A set of basic scaling considerations which enable qualitative comparisons between particular gyrotron interaction circuits is presented. These calculations are important in understanding the role of various electron beam and circuit parameters in achieving a viable gyrotron design. Following these scaling exercises, a series of design calculations is presented for a possible approach in achieving 100 GHz, 1 MW CW. These calculations include analyses of the electron gun and interaction circuit parts of the gyrotron, and a general analysis of other aspects of a high average power, high frequency gyrotron. Scalability of important aspects of the design to other frequencies is also discussed, as well as key technology issues

  1. Neutronic performance of a benchmark 1-MW LPSS

    International Nuclear Information System (INIS)

    Russell, G.J.; Pitcher, E.J.; Ferguson, P.D.

    1995-01-01

    We used split-target/flux-trap-moderator geometry in our 1-MW LPSS computational benchmark performance calculations because the simulation models were readily available. Also, this target/moderator arrangement is a proven LANSCE design and a good neutronic performer. The model has four moderator viewed surfaces, each with a 13x13 cm field-of-view. For our scoping neutronic-performance calculations, we attempted to get as much engineering realism into the target-system mockup as possible. In our present model, we account for target/reflector dilution by cooling; the D 2 O coolant fractions are adequate for 1 MW of 800-MeV protons (1.25 mA). We have incorporated a proton beam entry window and target canisters into the model, as well as (partial) moderator and vacuum canisters. The model does not account for target and moderator cooling lines and baffles, entire moderator canisters, and structural material in the reflector

  2. Mw 8.5 BENGKULU EARTHQUAKES FROM CONTINUOUS GPS DATA

    Directory of Open Access Journals (Sweden)

    W. A. W. Aris

    2016-09-01

    Full Text Available The Mw 8.5 Bengkulu earthquake of 30 September 2007 and the Mw8.6 28 March 2005 are considered amongst large earthquake ever recorded in Southeast Asia. The impact into tectonic deformation was recorded by a network of Global Positioning System (GPS Continuously Operating Reference Station (CORS within southern of Sumatra and west-coast of Peninsular Malaysia. The GPS data from the GPS CORS network has been deployed to investigate the characteristic of postseismic deformation due to the earthquakes. Analytical logarithmic and exponential function was applied to investigate the deformation decay period of postseismic deformation. This investigation provides a preliminary insight into postseismic cycle along the Sumatra subduction zone in particular and on the dynamics Peninsular Malaysia in general.

  3. The jet 10-MW lower hybrid current drive system

    International Nuclear Information System (INIS)

    Gormezano, C.; Bosia, G.; Brinkschulte, H.; David, C.; Dobbing, J.A.; Kaye, A.S.; Jacquinot, J.; Lloyd, B.; Knowlton, S.; Moreau, D.

    1987-01-01

    A Lower Hybrid system to control the plasma current profile is being prepared so that a higher central electron temperature can be obtained. The proposed system is designed to launch 10 MW of power at f = 3.7 GHz through a single port in JET, producing between 1 and 2 MA of RF driven current at an average density of 5 x 10 19 m -3 . Current drive efficiency is maximized by using a low value of the parallel wave number spectrum (N// - 1.3 - 2.3). The final launcher will be made of 48 multijunctions fed by 24 klystrons with the proper phasing. Dynamic matching of the launcher will be optimized by moving the launcher in real time during the pulse. A first stage (2 MW) is presently under construction. The full system is being designed to be in operation in 1990

  4. 10 MW, L-Band Klystron for Accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Read, Michael [Calabazas Creek Research, Inc., San Mateo, CA (United States); Ives, Robert L. [Calabazas Creek Research, Inc., San Mateo, CA (United States); Ferguson, Patrick [Calabazas Creek Research, Inc., San Mateo, CA (United States)

    2016-03-07

    This program developed a 10 MW, pulsed, Annular Beam Klystron (ABK) for accelerator applications. This is an alternative RF source to multiple beam klystrons MBKs), which are more complex and considerably more expensive. The ABK uses a single, annular cathode and a single beam tunnel with fundamental mode cavities. The operating specifications (voltage, efficiency, power, bndwidth, duty, etc.) are the same as for comparable MBKs.

  5. TITAN - a 9 MW, 179 bar pressurised water rig

    International Nuclear Information System (INIS)

    Mogford, D.J.; Lee, D.H.

    1987-02-01

    The report describes the TITAN rig built at Winfrith for thermal hydraulic experiments with water at up to 179 bar pressure. A power supply of 9 MW is available. The report describes three typical experiments that show the versatility of the rig. The first is a 25 rod pressurized water reactor fuel bundle critical heat flux experiment, the second is a parallel channel evaporator test and the third is a model jet pump test. (author)

  6. LBNF 1.2 MW TARGET: CONCEPTUAL DESIGN & FABRICATION

    Energy Technology Data Exchange (ETDEWEB)

    Crowley, Cory F. [Fermilab; Ammigan, K. [Fermilab; Anderson, K. [Fermilab; Hartsell, B. [Fermilab; Hurh, P. [Fermilab; Hylen, J. [Fermilab; Zwaska, R. [Fermilab

    2015-06-29

    Fermilab’s Long-Baseline Neutrino Facility (LBNF) will utilize a modified design based on the NuMI low energy target that is reconfigured to accommodate beam operation at 1.2 MW. Achieving this power with a graphite target material and ancillary systems originally rated for 400 kW requires several design changes and R&D efforts related to material bonding and electrical isolation. Target cooling, structural design, and fabrication techniques must address higher stresses and heat loads that will be present during 1.2 MW operation, as the assembly will be subject to cyclic loads and thermal expansion. Mitigations must be balanced against compromises in neutrino yield. Beam monitoring and subsystem instrumentation will be updated and added to ensure confidence in target positioning and monitoring. Remote connection to the target hall support structure must provide for the eventual upgrade to a 2.4 MW target design, without producing excessive radioactive waste or unreasonable exposure to technicians during reconfiguration. Current designs and assembly layouts will be presented, in addition to current findings on processes and possibilities for prototype and final assembly fabrication.

  7. LBNF 1.2 MW Target: Conceptual Design & Fabrication

    Energy Technology Data Exchange (ETDEWEB)

    Crowley, C. [Fermilab; Ammigan, K. [Fermilab; Anderson, K. [Fermilab; Hartsell, B. [Fermilab; Hurh, P. [Fermilab; Hylen, J. [Fermilab; Zwaska, R. [Fermilab

    2015-06-01

    Fermilab’s Long-Baseline Neutrino Facility (LBNF) will utilize a modified design based on the NuMI low energy target that is reconfigured to accommodate beam operation at 1.2 MW. Achieving this power with a graphite target material and ancillary systems originally rated for 400 kW requires several design changes and R&D efforts related to material bonding and electrical isolation. Target cooling, structural design, and fabrication techniques must address higher stresses and heat loads that will be present during 1.2 MW operation, as the assembly will be subject to cyclic loads and thermal expansion. Mitigations must be balanced against compromises in neutrino yield. Beam monitoring and subsystem instrumentation will be updated and added to ensure confidence in target positioning and monitoring. Remote connection to the target hall support structure must provide for the eventual upgrade to a 2.4 MW target design, without producing excessive radioactive waste or unreasonable exposure to technicians during reconfiguration. Current designs and assembly layouts will be presented, in addition to current findings on processes and possibilities for prototype and final assembly fabrication.

  8. Main trends of upgrading the 1000 MW steam turbine

    International Nuclear Information System (INIS)

    Drahy, J.

    1990-01-01

    Parameters are compared for the 1000 MW steam turbine manufactured by the Skoda Works, Czechoslovakia, and turbines in the same power range by other manufacturers, viz. ABB, Siemens/KWU, GEC and LMZ. The Skoda turbine compares well with the other turbines with respect to all design parameters, and moreover, enables the most extensive heat extraction for district heating purposes. The main trends in upgrading this turbine are outlined; in particular, they include an additional increase in the heat extraction, which is made possible by a new design of the low-pressure section or by using a ''satellite'' turbine. The studies performed also indicate that the output of the full-speed saturated steam turbine can be increased to 1300 MW. An experimental turbine representing one flow of the high-pressure part of the 1000 MW turbine is being built on the 1:1 scale. It will serve to verify the methods of calculation of the wet steam flow and to experimentally test the high-pressure part over a wide span of the parameters. (Z.M.). 1 tab., 3 figs., 7 refs

  9. 1000 MW steam turbine for nuclear power station

    International Nuclear Information System (INIS)

    Drahy, J.

    1987-01-01

    Skoda Works started the manufacture of the 1000 MW steam turbine for the Temelin nuclear power plant. The turbine will use saturated steam at 3,000 r.p.m. It will allow steam supply to heat water for district heating, this of an output of 893 MW for a three-stage water heating at a temperature of 150/60 degC or of 570 MW for a two-stage heating at a temperature of 120/60 degC. The turbine features one high-pressure and three identical low-pressure stages. The pressure gradient between the high-pressure and the low-pressure parts was optimized as concerns the thermal efficiency of the cycle and the thermodynamic efficiency of the low-pressure part. A value of 0.79 MPa was selected corresponding to the maximum flow rate of the steam entering the turbine. This is 5,495 t/h, the admission steam parameters are 273.3 degC and 5.8 MPa. The feed water temperature is 220.9 degC. It is expected that throughout the life of the turbine, there will be 300 cold starts, 1,000 starts following shutdown for 55 to 88 hours, and 600 starts following shutdown for 8 hours. (Z.M.). 8 figs., 1 ref

  10. Analysis of a prototype of a novel 1.5 MW, 170 GHz coaxial cavity gyrotron

    International Nuclear Information System (INIS)

    Rzesnicki, T.

    2007-06-01

    A 170 GHz, 2 MW coaxial cavity gyrotron is under development at the Institut fuer Hochleistungsimpuls- und Mikrowellentechnik (IHM) at Forschungszentrum Karlsruhe (FZK) which will be used as a high power microwave source for heating, current drive and stability control of plasmas in the International Thermonuclear Experimental Reactor (ITER). At frequencies above about 100 GHz the output power of conventional gyrotrons with cylindrical hollow waveguide cavities is limited to 1 MW in CW operation mainly due to the high Ohmic losses and the space charge voltage depression of the electron beam. The coaxial geometry enables a reduction of the mode competition in the gyrotron resonator and decreases also the influence of the beam voltage depression. As result a very high order operating mode (for example TE34,19 at 170 GHz) can be chosen which ultimately allows to increase the output power of the gyrotron in CW operation to a value as high as 2 MW. A first prototype of the 170 GHz, 2 MW coaxial cavity gyrotron has been designed, built and experimentally tested in short pulse operation at FZK. The main goal of this work was to investigate experimentally the design of the critical gyrotron components such as electron gun, resonator and a quasi-optical RF system. Those components are same as used in the first industrial coaxial prototype gyrotron for ITER. During the experiments a strong instability was observed inside the gyrotron tube due to the excitation of parasitic low frequency oscillations. The mechanism of the oscillations has been studied and possibilities for their suppression of these oscillations are proposed and experimentally verified. The RF output system is one of the most critical components. It is responsible for the coupling of the gyrotron power out of the gyrotron by converting the microwave power generated in the TE 34,19 -mode into a fundamental free space TEM 0,0 ''Gaussian'' mode. The performance of the RF output system has been tested in low

  11. Theseus, the 50 MW solar thermal power plant; Das solarthermische 50-MW-Kraftwerk Theseus

    Energy Technology Data Exchange (ETDEWEB)

    Brakmann, G. [Fichtner GmbH und Co. KG, Stuttgart (Germany). Solarenergieprojekte

    1998-04-01

    The Isle of Crete measures 8331 km{sup 2}, and this island renowned for its historical sites attracts millions of tourists every year. Like any other branch of industry, tourism, which is called a ``white`` industry, has an ever growing demand for electric power. Up to now, electricity generation on the island is based on fossil-fuelled thermal power plants. However, recent developments indicate that this technology might be overtaken soon by the novel Theseus power plant (Thermal Solar European Power Station) currently under construction. It is expected to usher in a new era of power generation on the Isle of Crete. (orig./CB) [Deutsch] Die 8 331 km{sup 2} grosse Insel Kreta wurde vor ueber 3 500 Jahren besiedelt. Der geschichtstraechtige Ort ist ein hochgeschaetztes Reiseziel von Millionen Griechenlandurlaubern. Wie jede Art von Industrie, so benoetigt auch die als `weisse Industrie` bezeichnete Touristikbranche immer mehr elektrische Energie. Diese wird derzeit auf Kreta ausschliesslich mit thermischen Kraftwerken, welche fossile Brennstoffe verbrennen, erzeugt. Aber die Vorherrschaft dieser Technologie kann schon bald mit dem neuen solarthermischen Kraftwerk Theseus (Thermal Solar European Power Station) gebrochen werden. Es soll in wenigen Jahren eine neue Aera der Energieerzeugung auf Kreta einlaeuten. (orig.)

  12. Thermal analysis of multi-MW two-level wind power converter

    DEFF Research Database (Denmark)

    Zhou, Dao; Blaabjerg, Frede; Mogens, Lau

    2012-01-01

    In this paper, the multi-MW wind turbine of partial-scale and full-scale two-level power converter with DFIG and direct-drive PMSG are designed and compared in terms of their thermal performance. Simulations of different configurations regarding loss distribution and junction temperature...... in the power device in the whole range of wind speed are presented and analyzed. It is concluded that in both partial-scale and full-scale power converter the most thermal stressed power device in the generator-side converter will have higher mean junction temperature and larger junction temperature...... fluctuation compared to grid-side converter at the rated wind speed. Moreover, the thermal performance of the generator-side converter in the partial-scale power converter becomes crucial around the synchronous operating point and should be considered carefully....

  13. Ijsselmij exploits a large wind park of 7. 5 MW in the Noordoostpolder, Netherlands

    Energy Technology Data Exchange (ETDEWEB)

    Nauta, Y

    1988-07-01

    The energy industry Ijsselmij constructed in 1987, along the Westermeerdijk north of Urk, Netherlands, a wind park of 7.5 MW. The wind park, built on the landside of the dike, consists of 25 wind turbines with a rotor diameter of 25 m and a capacity of 300 kW each. The total investment was about 21 million Dutch guilders. The park generates more than 10 million kWh annually supplied to the public electricity grid. The site selection, the foundations, the wind turbines, the electric connection, control unit to generate data, the economic feasibility and some aspects concerning noise pollution and bird damage are discussed. Finally technical data on the wind park are given. 9 figs.

  14. The isolated 678-km deep 30 May 2015 MW 7.9 Ogasawara (Bonin) Islands earthquake

    Science.gov (United States)

    Ye, L.; Lay, T.; Zhan, Z.; Kanamori, H.; Hao, J.

    2015-12-01

    Deep-focus earthquakes, located 300 to 700 km below the Earth's surface within sinking slabs of relatively cold oceanic lithosphere, are mysterious phenomena. Seismic radiation from deep events is essentially indistinguishable from that for shallow stick-slip frictional-sliding earthquakes, but the confining pressure and temperature are so high for deep-focus events that a distinct process is likely needed to account for their abrupt energy release. The largest recorded deep-focus earthquake (MW 7.9) in the Izu-Bonin slab struck on 30 May 2015 beneath the Ogasawara (Bonin) Islands, isolated from prior seismicity by over 100 km in depth, and followed by only 2 small aftershocks. Globally, this is the deepest (678 km) major (MW > 7) earthquake in the seismological record. Seismicity indicates along-strike contortion of the Izu-Bonin slab, with horizontal flattening near a depth of 550 km in the Izu region and progressive steepening to near-vertical toward the south above the location of the 2015 event. Analyses of a large global data set of P, SH and pP seismic phases using short-period back-projection, subevent directivity, and broadband finite-fault inversion indicate that the mainshock ruptured a shallowly-dipping fault plane with patchy slip that spread over a distance of ~40 km with variable expansion rate (~5 km/s down-dip initially, ~3 km/s up-dip later). During the 17 s rupture duration the radiated energy was ~3.3 x 1016 J and the stress drop was ~38 MPa. The radiation efficiency is moderate (0.34), intermediate to that of the 1994 Bolivia and 2013 Sea of Okhotsk MW 8.3 earthquakes, indicating a continuum of processes. The isolated occurrence of the event suggests that localized stress concentration associated with the pronounced deformation of the Izu-Bonin slab likely played a role in generating this major earthquake.

  15. The 2009 MW MW 6.1 L'Aquila fault system imaged by 64k earthquake locations

    International Nuclear Information System (INIS)

    Valoroso, Luisa

    2016-01-01

    On April 6 2009, a MW 6.1 normal-faulting earthquake struck the axial area of the Abruzzo region in central Italy. We investigate the complex architecture and mechanics of the activated fault system by using 64k high-resolution foreshock and aftershock locations. The fault system is composed by two major SW dipping segments forming an en-echelon NW trending system about 50 km long: the high-angle L’Aquila fault and the listric Campotosto fault, located in the first 10 km depth. From the beginning of 2009, fore shocks activated the deepest portion of the main shock fault. A week before the MW 6.1 event, the largest (MW 4.0) foreshock triggered seismicity migration along a minor off-fault segment. Seismicity jumped back to the main plane a few hours before the main shock. High-precision locations allowed to peer into the fault zone showing complex geological structures from the metre to the kilometre scale, analogous to those observed by field studies and seismic profiles. Also, we were able to investigate important aspects of earthquakes nucleation and propagation through the upper crust in carbonate-bearing rocks such as: the role of fluids in normal-faulting earthquakes; how crustal faults terminate at depths; the key role of fault zone structure in the earthquake rupture evolution processes.

  16. Economic Analyses and Potential Market of the 200MW Nuclear Heating Reactor

    International Nuclear Information System (INIS)

    Wang, Yongqing; Wang, Guiying

    1992-01-01

    Based on the 5MW experimental nuclear heating reactor, Intent has developed a 200MW demonstration nuclear heating reactor. Owing to its simplified systems and low operating parameters, the NCR-200 has preferable investment in comparison with that of a nuclear power plant. The pre-feasibility studies for several cities in Northern China have shown that the heat cost of a NCR-200 can be competitive with a coal fired heating plant. As a safe, clean and economic heat source, the NCR could pose a large market in replacement of coal for heating. The R and D work performed up to now has demonstrated that the NCR-200 operating under the present parameters can supply low pressure steam for industrial process and co-generation to enhance it economic benefit. The NCR-200 could also serve a heat source for air condition by using Li Br refrigerator, this application is very interesting to some cities in Central and Southern China. The applications of the NCR in oil recovery by injecting hot water and transportation are very promising for some oil fields in North China. In addition, the study on sea water desalination using the NCR-200 is being carried out at present under international cooperation. All of these will expansion the possible application of the NCR. The paper presents the economic analysis and the potential market of the NCR-200

  17. Performance test of a 1 MW class HTS synchronous motor for industrial application

    International Nuclear Information System (INIS)

    Kwon, Y.K.; Kim, H.M.; Baik, S.K.; Lee, E.Y.; Lee, J.D.; Kim, Y.C.; Lee, S.H.; Hong, J.P.; Jo, Y.S.; Ryu, K.S.

    2008-01-01

    This paper deals with development activities of high temperature superconducting (HTS) synchronous motor at DOOSAN heavy industry and Korea Electrotechnology Research Institute (KERI) in Korea, and is sponsored by DAPAS program which is supported by Korean government. The final aim of the project is realization of HTS motor in the field of industry such as large driving pumps, fans and compressors for utility and industrial environments. At present time, 1 MW HTS motor is developed for the purpose to fully represent the design and manufacturing issues for the larger capacity machine. The number of pole and rotating speed of machine are 2 pole and 3600 rpm. The HTS field coil of the developed motor is cooled by way of neon thermosyphon mechanism and the stator coil is cooled by water through hollow copper conductor. This paper describes status of 1 MW HTS motor development, such as design, fabrication and performance test results, which was conducted at steady state in generator mode and motor mode

  18. Internal Technical Report, Safety Analysis Report 5 MW(e) Raft River Research and Development Plant

    Energy Technology Data Exchange (ETDEWEB)

    Brown, E.S.; Homer, G.B.; Shaber, C.R.; Thurow, T.L.

    1981-11-17

    The Raft River Geothermal Site is located in Southern Idaho's Raft River Valley, southwest of Malta, Idaho, in Cassia County. EG and G idaho, Inc., is the DOE's prime contractor for development of the Raft River geothermal field. Contract work has been progressing for several years towards creating a fully integrated utilization of geothermal water. Developmental progress has resulted in the drilling of seven major DOE wells. Four are producing geothermal water from reservoir temperatures measured to approximately 149 C (approximately 300 F). Closed-in well head pressures range from 69 to 102 kPa (100 to 175 psi). Two wells are scheduled for geothermal cold 60 C (140 F) water reinjection. The prime development effort is for a power plant designed to generate electricity using the heat from the geothermal hot water. The plant is designated as the ''5 MW(e) Raft River Research and Development Plant'' project. General site management assigned to EG and G has resulted in planning and development of many parts of the 5 MW program. Support and development activities have included: (1) engineering design, procurement, and construction support; (2) fluid supply and injection facilities, their study, and control; (3) development and installation of transfer piping systems for geothermal water collection and disposal by injection; and (4) heat exchanger fouling tests.

  19. Internal Technical Report, Safety Analysis Report 5 MW(e) Raft River Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Brown, E.S.; Homer, G.B.; Spencer, S.G.; Shaber, C.R.

    1980-05-30

    The Raft River Geothermal Site is located in Southern Idaho's Raft River Valley, southwest of Malta, Idaho, in Cassia County. EG and G idaho, Inc., is the DOE's prime contractor for development of the Raft River geothermal field. Contract work has been progressing for several years towards creating a fully integrated utilization of geothermal water. Developmental progress has resulted in the drilling of seven major DOE wells. Four are producing geothermal water from reservoir temperatures measured to approximately 149 C (approximately 300 F). Closed-in well head pressures range from 69 to 102 kPa (100 to 175 psi). Two wells are scheduled for geothermal cold 60 C (140 F) water reinjection. The prime development effort is for a power plant designed to generate electricity using the heat from the geothermal hot water. The plant is designated as the ''5 MW(e) Raft River Research and Development Plant'' project. General site management assigned to EG and G has resulted in planning and development of many parts of the 5 MW program. Support and development activities have included: (1) engineering design, procurement, and construction support; (2) fluid supply and injection facilities, their study, and control; (3) development and installation of transfer piping systems for geothermal water collection and disposal by injection; and (4) heat exchanger fouling tests.

  20. Induced radioactivity in a 4 MW target and its surroundings

    CERN Document Server

    Agosteo, Stefano; Otto, Thomas; Silari, Marco

    2003-01-01

    An important aspect of a future CERN Neutrino Factory is the material activation arising from a 2.2 GeV, 4 MW proton beam striking a mercury target. An estimation of the hadronic inelastic interactions and the production of residual nuclei in the target, the magnetic horn, the decay tunnel, the surrounding rock and a downstream dump was performed by the Monte Carlo hadronic cascade code FLUKA. The aim was both to assess the dose equivalent rate to be expected during maintenance work and to evaluate the amount of residual radioactivity, which will have to be disposed of after the facility has ceased operation.

  1. A 350 MW HTR with an annular pebble bed core

    International Nuclear Information System (INIS)

    Wang Dazhong; Jiang Zhiqiang; Gao Zuying; Xu Yuanhui

    1992-12-01

    A conceptual design of HTR-module with an annular pebble bed core was proposed. This design can increase the unit power capacity of HTR-Module from 200 MWt to 350 MWt while it can keep the inherent safety characteristics of modular reactor. The preliminary safety analysis results for 350 MW HTR are given. In order to solve the problem of uneven helium outlet temperature distribution a gas flow mixing structure at bottom of core was designed. The experiment results of a gas mixing simulation test rig show that the mixing function can satisfy the design requirements

  2. Digital, remote control system for a 2-MW research reactor

    International Nuclear Information System (INIS)

    Battle, R.E.; Corbett, G.K.

    1988-01-01

    A fault-tolerant programmable logic controller (PLC) and operator workstations have been programmed to replace the hard-wired relay control system in the 2-MW Bulk Shielding Reactor (BSR) at Oak Ridge National Laboratory. In addition to the PLC and remote and local operator workstations, auxiliary systems for remote operation include a video system, an intercom system, and a fiber optic communication system. The remote control station, located at the High Flux Isotope Reactor 2.5 km from the BSR, has the capability of rector startup and power control. The system was designed with reliability and fail-safe features as important considerations. 4 refs., 3 figs

  3. Design of 250-MW CW RF system for APT

    International Nuclear Information System (INIS)

    Rees, D.

    1997-01-01

    The design for the RF systems for the APT (Accelerator Production of Tritium) proton linac will be presented. The linac produces a continuous beam power of 130 MW at 1300 MeV with the installed capability to produce up to a 170 MW beam at 1700 MeV. The linac is comprised of a 350 MHz RFQ to 7 MeV followed in sequence by a 700 MHz coupled-cavity drift tube linac, coupled-cavity linac, and superconducting (SC) linac to 1700 MeV. At the 1700 MeV, 100 mA level the linac requires 213 MW of continuous-wave (CW) RF power. This power will be supplied by klystrons with a nominal output power of 1.0 MW. 237 kystrons are required with all but three of these klystrons operating at 700 MHz. The klystron count includes redundancy provisions that will be described which allow the RF systems to meet an operational availability in excess of 95 percent. The approach to achieve this redundancy will be presented for both the normal conducting (NC) and SC accelerators. Because of the large amount of CW RF power required for the APT linac, efficiency is very important to minimize operating cost. Operation and the RF system design, including in-progress advanced technology developments which improve efficiency, will be discussed. RF system performance will also be predicted. Because of the simultaneous pressures to increase RF system reliability, reduce tunnel envelope, and minimize RF system cost, the design of the RF vacuum windows has become an important issue. The power from a klystron will be divided into four equal parts to minimize the stress on the RF vacuum windows. Even with this reduction, the RF power level at the window is at the upper boundary of the power levels employed at other CW accelerator facilities. The design of a 350 MHz, coaxial vacuum window will be presented as well as test results and high power conditioning profiles. The transmission of 950 kW, CW, power through this window has been demonstrated with only minimal high power conditioning

  4. Deposition and high temperature corrosion in a 10 MW straw

    DEFF Research Database (Denmark)

    Michelsen, Hanne Philbert; Frandsen, Flemming; Dam-Johansen, Kim

    1998-01-01

    Deposition and corrosion measurements were conducted at a 10 MW wheat straw fired stoker boiler used for combined power and heat production. The plant experiences major problems with deposits on the heat transfer surfaces, and test probes have shown enhanced corrosion due to selective corrosion...... for metal temperatures above 520 C. Deposition measurements carried out at a position equal to the secondary superheater showed deposits rich in potassium and chlorine and to a lesser extent in silicon, calcium, and sulfur. Potassium and chlorine make up 40-80 wt% of the deposits. Mechanisms of deposit...

  5. Design of an aeroelastically tailored 10 MW wind turbine rotor

    DEFF Research Database (Denmark)

    Zahle, Frederik; Tibaldi, Carlo; Pavese, Christian

    2016-01-01

    This work presents an integrated multidisciplinary wind turbine optimization framework utilizing state-of-the-art aeroelastic and structural tools, capable of simultaneous design of the outer geometry and internal structure of the blade. The framework is utilized to design a 10 MW rotor constrained...... not to exceed the design loads of an existing reference wind turbine. The results show that through combined geometric tailoring of the internal structure and aerodynamic shape of the blade it is possible to achieve significant passive load alleviation that allows for a 9% longer blade with an increase in AEP...

  6. 1.5 MW RF Load for ITER

    International Nuclear Information System (INIS)

    Ives, Robert Lawrence; Marsden, David; Collins, George; Karimov, Rasul; Mizuhara, Max; Neilson, Jeffrey

    2016-01-01

    Calabazas Creek Research, Inc. developed a 1.5 MW RF load for the ITER fusion research facility currently under construction in France. This program leveraged technology developed in two previous SBIR programs that successfully developed high power RF loads for fusion research applications. This program specifically focused on modifications required by revised technical performance, materials, and assembly specification for ITER. This program implemented an innovative approach to actively distribute the RF power inside the load to avoid excessive heating or arcing associated with constructive interference. The new design implemented materials and assembly changes required to meet specifications. Critical components were built and successfully tested during the program.

  7. 1.5 MW RF Load for ITER

    Energy Technology Data Exchange (ETDEWEB)

    Ives, Robert Lawrence [Calabazas Creek Research, Inc., San Mateo, CA (United States); Marsden, David [Calabazas Creek Research, Inc., San Mateo, CA (United States); Collins, George [Calabazas Creek Research, Inc., San Mateo, CA (United States); Karimov, Rasul [Calabazas Creek Research, Inc., San Mateo, CA (United States); Mizuhara, Max [Calabazas Creek Research, Inc., San Mateo, CA (United States); Neilson, Jeffrey [Lexam Research, Redwood City, CA (United States)

    2016-09-01

    Calabazas Creek Research, Inc. developed a 1.5 MW RF load for the ITER fusion research facility currently under construction in France. This program leveraged technology developed in two previous SBIR programs that successfully developed high power RF loads for fusion research applications. This program specifically focused on modifications required by revised technical performance, materials, and assembly specification for ITER. This program implemented an innovative approach to actively distribute the RF power inside the load to avoid excessive heating or arcing associated with constructive interference. The new design implemented materials and assembly changes required to meet specifications. Critical components were built and successfully tested during the program.

  8. Component development for X-band above 100 MW

    International Nuclear Information System (INIS)

    Fowkes, W.R.; Callin, R.S.; Studzinski, M.

    1991-05-01

    The requirement for some of the components described in this paper began with the Relativistic Klystron program done in collaboration with LLNL and LBL. This effort culminated in a klystron operating at 11.4 GHz delivering 330 MW into a pair of high-gradient accelerating structures. The electron beam for this klystron was formed in a 1 MeV induction linac at a very low duty cycle. The subsequent RF source development work at SLAC for the Next Linear Collider utilized some of these components, and required further and new development of others, work reliably at higher average power. 6 refs., 6 figs., 1 tab

  9. Disassembling and rebuilding 900 MW unit fuel assemblies in Celimene

    International Nuclear Information System (INIS)

    Giquel, G.; Leseur, A.; Pillet, C.; Van Craeynest, J.C.

    1987-01-01

    The Celimene high activity laboratory, in the Nuclear Research Centre of Saclay, has equipment for and experience of disassembling and rebuilding fuel assemblies from 900 MW light water reactors. These operations have been performed for R and D purposes; they allow removal for investigation of some of the fuel rods and examination of the skeleton. The rebuilt assemblies are sent to the fuel reprocessing plant. Reirradiation of these assemblies has not been considered so far and would require modifications of the procedure and of parts of the new skeleton. Disassembling and rebuilding have already been performed on three assemblies and a fourth one will be rebuilt in the coming months [fr

  10. Peigan Nation to start 101 MW wind farm this month

    International Nuclear Information System (INIS)

    McArthur, D.; Salaff, S.

    1998-01-01

    A joint venture, named Weather-Dancer Wind Power Inc., between Advanced Thermodynamics Corporation (ATC) and the Peigan First Nation Community in Alberta will begin construction in June of a wind farm on its 39,000 hectare reserve. The construction will be progressive, up to a maximum of 101 MW. If and when the farm reaches its full size, it will have cost around $175 million. The wind farm will utilize Nordex Balcke-Duerr (Nordex BD) wind turbines from Denmark. ATC is the sole distributor of these turbines in Canada, and will seek opportunities to market Nordex BD turbines and components throughout Alberta and Western Canada. ATC is also aggressively pursuing opportunities in Quebec and in Atlantic Canada. Financing for the construction of the wind farm and a long-term power purchase and distribution agreement with TransAlta Utilities are as yet incomplete, but negotiations are reported to be progressing well. The Nordex BD N54/1000, rated at one MW, will be the largest turbine, and the Peigan Nation Farm the largest wind farm in North America. This is the second attempt by the Peigan Nation to develop a wind farm on the reserve. On the first attempt, the development failed to secure access to the land needed for the project. This time around, a referendum will be held well in advance of the starting date for construction to obtain majority band approval of the site

  11. Physical status of the 10 MW test module

    International Nuclear Information System (INIS)

    Luo Jingyu

    1991-01-01

    Like most graphite moderated HTR systems, the 10 MW Test-Module reactor is undermoderated. This means if the water ingress is into the pebble bed that this system will gain reactivity as moderator is added to the core. The reactivity increase caused by water ingress strongly depends on the geometry of the core, the temperature, the burnup status and especially the moderator to fuel ratio (the metal content per fuel element). For the equilibrium core 5 gram of heavy metal per fuel element is chosen in order to limit the effect of water ingress. Another important effect of water ingress is to reduce the worth of control rods which are usually located in the reflector. The distance between core and control rods in the reflector are carefully calculated. In the 10 MW Test-Module reactor the core shutdown capability of 12 control rods are selected such that any accident reactivity can be counterbalanced and only half of the rods have to be available to render the reactor down from normal operation to the cold, permanent subcritical condition. (author). 5 figs, 3 tabs

  12. Improving 900 MW(e) PWR control rooms

    International Nuclear Information System (INIS)

    Bouat, M.; Marcille, R.

    1983-01-01

    Analyses of the behaviour of operators during operating tests on PWR units and the lessons learned from the TMI-2 accident have demonstrated the need to improve the interface between operators and the facilities they control. To that end, and to complement its establishment of safety panels, Electricite de France (EDF) embarked upon a study on the ''Modification of Control Desks and Boards'' in control rooms. This study, involving twenty-eight 900 MW(e) units, almost all of which are currently in service, began with an ergonomic analysis of control rooms by an external consultant, the ADERSA GERBIOS Association. This analysis was based on interviews with simulator instructors and operators, a study of the operation of the unit, and a general review of previous studies. The analysis began in October 1980 and resulted, in April 1981, in a critical report and a proposal to create a full-scale mock-up of a 900 MW(e) control room. Improvements to this were subsequently proposed, enabling options to be made between, among other things, active overall control panels and function-by-function control panels. Finally, a number of general principles, which largely encompass the operators' suggestions, were defined. The alterations to be made will make it necessary to revamp the control panels completely. The work and tests involved should match the duration of refuelling shut-downs. Audio-visual training programmes are planned (portable model). (author)

  13. Beginning-of-life neutronic analysis of a 3000-MW(t) HTGR

    International Nuclear Information System (INIS)

    Vigil, J.C.

    1975-12-01

    The results of a study of safety-related neutronic characteristics for the beginning-of-life core of a 3000-MW(t) High-Temperature Gas-Cooled Reactor are presented. Emphasis was placed on the temperature-dependent reactivity effects of fuel, moderator, control poisons, and fission products. Other neutronic characteristics studied were gross and local power distributions, neutron kinetics parameters, control rod and other material worths and worth distributions, and the reactivity worth of a selected hypothetical perturbation in the core configuration. The study was performed for the most part using discrete-ordinates transport theory codes and neutron cross sections that were interpolated from a four-parameter nine-group library supplied by the HTGR vendor. A few comparison calculations were also performed using nine-group data generated with an independent cross-section processing code system. Results from the study generally agree well with results reported by the HTGR vendor

  14. Seismic response analyses of turbine hall and electrical building of RBMK-1000 MW type NPP

    International Nuclear Information System (INIS)

    Jordanov, M.J.; Karparov, K.T.

    2003-01-01

    This paper addresses results obtained during the study of turbine hall and electrical building of RBMK-1000 MW pair units at Leningradskaya NPP (LNPP) for seismic event. The study was performed in the frame of the Coordinated Research Program of the International Atomic Agency (IAEA) on Safety of RBMK type Nuclear Power Plants (NPP) in Relation of External Events. A 3-D finite element model of Main Building Complex was developed and seismic response analyses were performed taking into account the soil-structure interaction (SSI). The standard mode superposition method was used for evaluation of dynamic response of structure in time domain. The structure was assumed surface founded at the basemat level. Seismic response analyses were carried out considering shear wave propagation pattern for the input motion. The in-structure time histories and response spectra were generated in referenced locations. Conclusions are drawn for the reliability of the structural response evaluation considering the soil-structure interaction effects. (author)

  15. Modeling and Simulation of Offshore Wind Power Platform for 5 MW Baseline NREL Turbine

    Directory of Open Access Journals (Sweden)

    Taufik Roni Sahroni

    2015-01-01

    Full Text Available This paper presents the modeling and simulation of offshore wind power platform for oil and gas companies. Wind energy has become the fastest growing renewable energy in the world and major gains in terms of energy generation are achievable when turbines are moved offshore. The objective of this project is to propose new design of an offshore wind power platform. Offshore wind turbine (OWT is composed of three main structures comprising the rotor/blades, the tower nacelle, and the supporting structure. The modeling analysis was focused on the nacelle and supporting structure. The completed final design was analyzed using finite element modeling tool ANSYS to obtain the structure’s response towards loading conditions and to ensure it complies with guidelines laid out by classification authority Det Norske Veritas. As a result, a new model of the offshore wind power platform for 5 MW Baseline NREL turbine was proposed.

  16. Modeling and Simulation of Offshore Wind Power Platform for 5 MW Baseline NREL Turbine

    Science.gov (United States)

    Roni Sahroni, Taufik

    2015-01-01

    This paper presents the modeling and simulation of offshore wind power platform for oil and gas companies. Wind energy has become the fastest growing renewable energy in the world and major gains in terms of energy generation are achievable when turbines are moved offshore. The objective of this project is to propose new design of an offshore wind power platform. Offshore wind turbine (OWT) is composed of three main structures comprising the rotor/blades, the tower nacelle, and the supporting structure. The modeling analysis was focused on the nacelle and supporting structure. The completed final design was analyzed using finite element modeling tool ANSYS to obtain the structure's response towards loading conditions and to ensure it complies with guidelines laid out by classification authority Det Norske Veritas. As a result, a new model of the offshore wind power platform for 5 MW Baseline NREL turbine was proposed. PMID:26550605

  17. Possibility of revitalization of control system of steam turbine 210 MW LMZ

    International Nuclear Information System (INIS)

    Racki, Branko

    2004-01-01

    It is a one-shaft, three casing condensing turbine, type K-210-130. A rigid coupling connects it directly to the electric energy generator. There is one intermediate superheat of steam and seven non regulated blending for regenerative condensate heating. A considerate number of such turbines have been used on the territory of the Eastern Europe. There are two blocks installed in TP Sisak, Croatia. There is a survey of the existing control system of turbine, power 210 MW. It points out and describes problems appearing during exploitation. Technical solutions according to complexity of realization have been described. It gives an overview of minimum range of modification with utilization of the existing oil system and maximum range by adding separate high pressure oil system with new solutions for performing segments. (Author)

  18. Floating substructure flexibility of large-volume 10MW offshore wind turbine platforms in dynamic calculations

    International Nuclear Information System (INIS)

    Borg, Michael; Hansen, Anders Melchior; Bredmose, Henrik

    2016-01-01

    Designing floating substructures for the next generation of 10MW and larger wind turbines has introduced new challenges in capturing relevant physical effects in dynamic simulation tools. In achieving technically and economically optimal floating substructures, structural flexibility may increase to the extent that it becomes relevant to include in addition to the standard rigid body substructure modes which are typically described through linear radiation-diffraction theory. This paper describes a method for the inclusion of substructural flexibility in aero-hydro-servo-elastic dynamic simulations for large-volume substructures, including wave-structure interactions, to form the basis of deriving sectional loads and stresses within the substructure. The method is applied to a case study to illustrate the implementation and relevance. It is found that the flexible mode is significantly excited in an extreme event, indicating an increase in predicted substructure internal loads. (paper)

  19. Thermal Loading and Reliability of 10 MW Multilevel Wind Power Converter at Different Wind Roughness Classes

    DEFF Research Database (Denmark)

    Isidori, Andrea; Rossi, Fabio Mario; Blaabjerg, Frede

    2014-01-01

    This paper focuses on the design, thermal loading, and reliability of a three-level neutral-point-clamped back-to-back full-scale converter for a 10-MW direct-drive wind turbine equipped with a permanent-magnet synchronous generator. The reliability performance of the three-level converter...... is strongly influenced by the thermal behavior of the semiconductor devices and their mission profile which directly affects the lifetime and the cost of the entire converter. Therefore, a simulation platform is developed in a Matlab/Simulink and PLECS simulation environment to analyze the dynamics...... of the system using different kinds of modulation strategies and analyzing the different wind-load conditions that are dependent on roughness classes. This paper shows that the 60 ° discontinuous pulsewidth-modulation strategies allow better thermal performance and increase the estimated lifetime...

  20. Thermal loading and reliability of 10 MW multilevel wind power converter at different wind roughness classes

    DEFF Research Database (Denmark)

    Isidori, Andrea; Rossi, Fabio Mario; Blaabjerg, Frede

    2012-01-01

    This paper focuses on the design, thermal loading and reliability of a three-level Neutral Point Clamped (3-L NPC) back-to-back full scale converter for a 10 MW direct-drive wind turbine equipped with a Permanent Magnet Synchronous Generator (PMSG). The reliability performance of the three......-level converter is strongly influenced by the thermal behaviour of the semiconductor devices and their mission profile which directly affects the lifetime and the cost of the whole converter. Therefore, the simulation platform is developed in Matlab/Simulink and PLECS simulation environment to analyse...... the dynamics of the system using different kinds of modulation strategies and analyzing different wind load conditions dependent on roughness classes. It is concluded that 60° discontinuous PWM modulation strategies show better thermal performance and increase the estimated lifetime of the converter...

  1. Final Report, Validation of Novel Planar Cell Design for MW-Scale SOFC Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Swartz, Dr Scott L.; Thrun, Dr Lora B.; Arkenberg, Mr Gene B.; Chenault, Ms Kellie M.

    2012-01-03

    This report describes the work completed by NexTech Materials, Ltd. during a three-year project to validate an electrolyte-supported planar solid oxide fuel cell design, termed the FlexCell, for coal-based, megawatt-scale power generation systems. This project was focused on the fabrication and testing of electrolyte-supported FlexCells with yttria-stabilized zirconia (YSZ) as the electrolyte material. YSZ based FlexCells were made with sizes ranging from 100 to 500 cm2. Single-cell testing was performed to confirm high electrochemical performance, both with diluted hydrogen and simulated coal gas as fuels. Finite element analysis modeling was performed at The Ohio State University was performed to establish FlexCell architectures with optimum mechanical robustness. A manufacturing cost analysis was completed, which confirmed that manufacturing costs of less than $50/kW are achievable at high volumes (500 MW/year).

  2. Validation of Novel Planar Cell Design for MW-Scale SOFC Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Scott Swartz; Lora Thrun; Gene Arkenberg; Kellie Chenault

    2011-09-30

    This report describes the work completed by NexTech Materials, Ltd. during a three-year project to validate an electrolyte-supported planar solid oxide fuel cell design, termed the FlexCell, for coal-based, megawatt-scale power generation systems. This project was focused on the fabrication and testing of electrolyte-supported FlexCells with yttria-stabilized zirconia (YSZ) as the electrolyte material. YSZ based FlexCells were made with sizes ranging from 100 to 500 cm{sup 2}. Single-cell testing was performed to confirm high electrochemical performance, both with diluted hydrogen and simulated coal gas as fuels. Finite element analysis modeling was performed at The Ohio State University was performed to establish FlexCell architectures with optimum mechanical robustness. A manufacturing cost analysis was completed, which confirmed that manufacturing costs of less than $50/kW are achievable at high volumes (500 MW/year). DISCLAIMER

  3. Development of the C-band (5712 MHz) 50 MW class PPM klystron (2)

    International Nuclear Information System (INIS)

    Matsumoto, H.; Shintake, T.; Ohkubo, Y.; Taoka, H.; Ohhashi, K.; Kakuno, K.

    2001-01-01

    Hot isostatic pressing (HIP) technique has been firstly applied to fabricate a magnetic circuit in a PPM klystron. Simply stacking disks of the magnetic stainless-steel (Mag-SUS) and oxygen-free-copper (OFC) alternatively, and processing in a HIP vessel filled with pressurised Ar-gas at 1200-kgf/cm 2 and temperature of 800degC for 2 hours, they were bonded in one block with diffusion bonding. No brazing-alloys were used in this process. After machining the rf-cavities and beam drift-tube on the bonded PPM stack, they were assembled together in one body by means of conventional brazing method. The C-band PPM klystron based on this technique was fabricated in the course of the Linear Collider R and D. Out-put power of 37 MW was generated with 2.5-μsec pulse width and 50 pps repetition rate. (author)

  4. Future aspects for liquid metal heated steam generators

    International Nuclear Information System (INIS)

    Jansing, W.; Ratzel, W.; Vinzens, K.

    1975-01-01

    The present status of steam generators is shown. The experience gained until now is expressed in form of basic points. The most important design criteria for steam generator systems are outlined. On the basis of these design criteria, two possible steam generator concepts are shown. Costs in relationship to the repair concepts of two modular steam generators (thermal output 156 and 625 MW) and a pool design of 625 MW are compared. (author)

  5. Future aspects for liquid metal heated steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Jansing, W; Ratzel, W; Vinzens, K

    1975-07-01

    The present status of steam generators is shown. The experience gained until now is expressed in form of basic points. The most important design criteria for steam generator systems are outlined. On the basis of these design criteria, two possible steam generator concepts are shown. Costs in relationship to the repair concepts of two modular steam generators (thermal output 156 and 625 MW) and a pool design of 625 MW are compared. (author)

  6. Analysis of the malfunctioning and failure of a 15 MW hydraulic turbine; Analisis de malfuncionamiento y de falla de una turbina hidraulica de 15 MW

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Illescas, R.; Perez Rodriguez, N. [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2007-11-15

    A case history is presented of the rehabilitation process of three hydraulic turbines with a capacity of 15 MW each one. Such units are used for electric power generation, mainly to supply part of the center zone of the Mexican Republic. The turbo-generator units had been practically destroyed by catastrophic floods and only part of the equipment was recovered and reconditioned for its operation. One of the three turbines presented serious functioning problems preventing its reliable operation that was evidenced by excessive mechanical vibrations and heating in the bearing zone. This paper presents the diagnosis of the possible causes of failure and the corrective measures taken. Serious rotor misalignment problems were observed respect to its bearings and the turbine scroll. Additionally, during the inspection of the turbine runner and of the bearing it was observed that important friction have existed, which incremented the vibrations. It is shown that such rubbings are not the cause of the problem but only a manifestation of the same. Finally some of the conclusions and their solution are presented. [Spanish] Se presenta un caso historico del proceso de rehabilitacion de tres turbinas hidraulicas con capacidad de 15 MW cada una. Dichas unidades son empleadas en la generacion electrica, principalmente para abastecer parte de la zona centro de la republica mexicana. Las unidades turbogeneradores habian sido practicamente destruidas por inundaciones catastroficas y solo parte del equipo fue rescatado y rehabilitado para su operacion. Una de las tres turbinas presento graves problemas de funcionamiento, impidiendo su operacion confiable, lo cual se manifestaba mediante vibraciones mecanicas excesivas y calentamiento en zona de chumaceras. En este articulo se presenta el diagnostico de las posibles causas de falla y las acciones correctivas tomandas. Se observan problemas fuertes de desalineamiento del rotor respecto a sus chumaceras y al caracol de la turbina

  7. Analysis of the fault and malfunctioning of a 15 MW hydraulic turbine; Analisis de la falla y malfuncionamiento de una turbina hidraulica de 15 MW

    Energy Technology Data Exchange (ETDEWEB)

    Garcia I, Rafael; Perez R, Norberto [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2007-07-01

    An historical case of the rehabilitation process of three hydraulic turbines with capacity of 15 MW each is presented. These units are used for the electrical generation, mainly to supply part of the central zone of the Mexican Republic. The turbo-generator units had been practically destroyed by catastrophic floods and only part of the equipment was rescued and rehabilitated for its operation. One of the three turbines presented serious operational problems, preventing its reliable operation evidenced by the excessive mechanical vibrations and heating of the bearing zone. This article presents the diagnosis of the possible causes of fault and the remedial actions taken. Strong misalignment problems of the runner with respect to its bearings and to the scroll case of the turbine are observed. In addition, during the inspection of the turbine runner and of the bearings it is observed that important frictions have existed, which increased the vibrations. It is shown that these frictions are not the cause of the problem but only one manifestation of the same. Finally some conclusions of the problem and their solution are presented. [Spanish] Se presenta un caso historico del proceso de rehabilitacion de tres turbinas hidraulicas con capacidad de 15 MW cada una. Dichas unidades son empleadas en la generacion electrica, principalmente para abastecer parte de la zona centro de la Republica Mexicana. Las unidades turbogeneradores habian sido practicamente destruidas por inundaciones catastroficas y solo parte del equipo fue rescatado y rehabilitado para su operacion. Una de las tres turbinas presento graves problemas de funcionamiento, impidiendo su operacion confiable, lo cual se manifestaba mediante vibraciones mecanicas excesivas y calentamiento en zona de chumaceras. En este articulo se presenta el diagnostico de las posibles causas de falla y las acciones correctivas tomadas. Se observan problemas fuertes de desalineamiento del rotor respecto a sus chumaceras y al

  8. 15 MW HArdware-in-the-loop Grid Simulation Project

    Energy Technology Data Exchange (ETDEWEB)

    Rigas, Nikolaos [Clemson Univ., SC (United States); Fox, John Curtiss [Clemson Univ., SC (United States); Collins, Randy [Clemson Univ., SC (United States); Tuten, James [Clemson Univ., SC (United States); Salem, Thomas [Clemson Univ., SC (United States); McKinney, Mark [Clemson Univ., SC (United States); Hadidi, Ramtin [Clemson Univ., SC (United States); Gislason, Benjamin [Clemson Univ., SC (United States); Boessneck, Eric [Clemson Univ., SC (United States); Leonard, Jesse [Clemson Univ., SC (United States)

    2014-10-31

    The 15MW Hardware-in-the-loop (HIL) Grid Simulator project was to (1) design, (2) construct and (3) commission a state-of-the-art grid integration testing facility for testing of multi-megawatt devices through a ‘shared facility’ model open to all innovators to promote the rapid introduction of new technology in the energy market to lower the cost of energy delivered. The 15 MW HIL Grid Simulator project now serves as the cornerstone of the Duke Energy Electric Grid Research, Innovation and Development (eGRID) Center. This project leveraged the 24 kV utility interconnection and electrical infrastructure of the US DOE EERE funded WTDTF project at the Clemson University Restoration Institute in North Charleston, SC. Additionally, the project has spurred interest from other technology sectors, including large PV inverter and energy storage testing and several leading edge research proposals dealing with smart grid technologies, grid modernization and grid cyber security. The key components of the project are the power amplifier units capable of providing up to 20MW of defined power to the research grid. The project has also developed a one of a kind solution to performing fault ride-through testing by combining a reactive divider network and a large power converter into a hybrid method. This unique hybrid method of performing fault ride-through analysis will allow for the research team at the eGRID Center to investigate the complex differences between the alternative methods of performing fault ride-through evaluations and will ultimately further the science behind this testing. With the final goal of being able to perform HIL experiments and demonstration projects, the eGRID team undertook a significant challenge with respect to developing a control system that is capable of communicating with several different pieces of equipment with different communication protocols in real-time. The eGRID team developed a custom fiber optical network that is based upon FPGA

  9. Operating results of 220 MW SKODA saturated steam turbines

    International Nuclear Information System (INIS)

    Drahy, J.

    1992-01-01

    One of the steam turbines produced by the SKODA Works, the 220 MW steam turbine for saturated admission steam of a speed of 3000 r.p.m. is described; it is used in nuclear power plants with 400 MW PWR type reactors. 16 units of 8 turbines each have been in operation in the Jaslovske Bohunice and Dukovany power plants with the total period of operation of all machines exceeding 750,000 hours. The 220 MW steam turbine consists of a two-flow high-pressure section and of two identical two-flow low-pressure sections. The pressure of saturated steam at the inlet of the high-pressure section is 4.32 MPa (the corresponding temperature of the saturation limit being 255 degC) and during the expansion in the high-pressure section it drops to 0.6 MPa; steam moisture reaches 12%. In a separator and two-stage reheater using blend steam, the steam is freed of the moisture and is reheated to a temperature of 217 degC. Some operational problems are discussed, as are the loss of the material of the stator parts of the high-pressure section due to corrosion-erosion wear and corrosion-erosion wear of the guide wheels of the high-pressure section, and measures are presented carried out for the reduction of the corrosion-erosion effects of wet steam. One of the serious problems were the fatigue fractures of the blades of the 4th high-pressure stage, which appeared after 20 000 to 24 000 hours of operation in the dented tee-root. The guide wheels of the 4th stage were substituted by new guide wheels with uniform pitch of the channels and with increased number of guide blades. Also discussed are the dynamic behavior of the low-pressure section of the bridge structure, the operating reliability and the heat off-take for water heating of long-distance heating systems. (Z.S.) 9 figs

  10. Loss analysis of a 1 MW class HTS synchronous motor

    International Nuclear Information System (INIS)

    Baik, S K; Kwon, Y K; Kim, H M; Lee, J D; Kim, Y C; Park, H J; Kwon, W S; Park, G S

    2009-01-01

    The HTS (High-Temperature Superconducting) synchronous motor has advantages over the conventional synchronous motor such as smaller size and higher efficiency. Higher efficiency is due to smaller loss than the conventional motor, so it is important to do loss analysis in order to develop a machine with higher efficiency. This paper deals with machine losses those are dissipated in each part of a HTS synchronous motor. These losses are analyzed theoretically and compared with loss data obtained from experimental results of a 1 MW class HTS synchronous motor. Each machine loss is measured based on IEEE 115 standard and the results are analyzed and considered based on the manufacturing of the test machine.

  11. 120 MW, 800 MHz Magnicon for a Future Muon Collider

    International Nuclear Information System (INIS)

    Jay L. Hirshfield

    2005-01-01

    Development of a pulsed magnicon at 800 MHz was carried out for the muon collider application, based on experience with similar amplifiers in the frequency range between 915 MHz and 34.3 GHz. Numerical simulations using proven computer codes were employed for the conceptual design, while established design technologies were incorporated into the engineering design. A cohesive design for the 800 MHz magnicon amplifier was carried out, including design of a 200 MW diode electron gun, design of the magnet system, optimization of beam dynamics including space charge effects in the transient and steady-state regimes, design of the drive, gain, and output cavities including an rf choke in the beam exit aperture, analysis of parasitic oscillations and design means to eliminate them, and design of the beam collector capable of 20 kW average power operation

  12. Stability characteristics of the 500 mw Indian PFBR

    Directory of Open Access Journals (Sweden)

    Anuraj Vijayan L.

    2015-01-01

    Full Text Available After the successful operation of the fast breeder test reactor for over two decades, India is now nearing the completion of a 500 MW (electrical prototype fast breeder reactor. This commercial scale power reactor is a sodium-cooled, pool-type, mixed-oxide fuelled fast reactor. The stability characteristics of the reactor are an important safety aspect to be studied. In the present work, linear stability of the prototype fast breeder reactor analysis is carried out using the transfer function method, while the stability of the system is checked via the Nyquist criteria. For the completeness of the study, transient analysis with various kinds of reactivity perturbations was carried out. The response of the system in both cases indicated that the system is stable.

  13. SECURE-400 MW: Failure analysis and calculation of release

    International Nuclear Information System (INIS)

    Bento, J.-P.

    1978-11-01

    The environmental effects of SECURE-400 MW has been investigated for normal operation and after an accident. When calculating the doses during normal operation it has been assumed that 0.1 % of the fuel elements in the core have fuel cladding damages. The doses after an accident have been calculated only for the cases when there might be an effect on the environment: accidents at change of fuel, fracture of the biggest gas pipe and fracture of the main coolant loop. The result of the investigation is that a core melting accident in SECURE 400 is impossible due to the design of the different systems. Other typs of accidents which might happen will give extremly low doses to the environment. The doses will not differ significantly from doses during normal operation. (K.K.)

  14. Project and characteristics of a 5MW experimental fast reactor

    International Nuclear Information System (INIS)

    Ishiguro, Y.; Nascimento, J.A. do.

    1986-05-01

    Characteristics of a 5 MW experimental fast reactor are reported. The reactor is designed with emphasis on fuel and materials irradiation and uses fuel assemblies of a standard structure. The reference core consist of 37 fuel assemblies, each of which contains 19 pins of metallic Pu/Zr fuel. With a core height of 17.6 cm the core volume is 11.4 liter and the central fast (E >=100 KeV) flux is 0.9 x 10 15 n/cm 2 sec. In addition to twelve control rod assemblies with a total reactivity worth of 5.5% Δk, 42 assemblies for reactivity compensation are placed in the two rings outside the core. Replacing these assemblies with driver, blanket, or refletor-shield assemblies, large reactivities can be added to make the central assembly position available for test irradiations and to assure high levels of burnup of driver assemblies. (Author) [pt

  15. 5 MW pulsed spallation neutron source, Preconceptual design study

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This report describes a self-consistent base line design for a 5 MW Pulsed Spallation Neutron Source (PSNS). It is intended to establish feasibility of design and as a basis for further expanded and detailed studies. It may also serve as a basis for establishing project cost (30% accuracy) in order to intercompare competing designs for a PSNS not only on the basis of technical feasibility and technical merit but also on the basis of projected total cost. The accelerator design considered here is based on the objective of a pulsed neutron source obtained by means of a pulsed proton beam with average beam power of 5 MW, in {approx} 1 {mu}sec pulses, operating at a repetition rate of 60 Hz. Two target stations are incorporated in the basic facility: one for operation at 10 Hz for long-wavelength instruments, and one operating at 50 Hz for instruments utilizing thermal neutrons. The design approach for the proton accelerator is to use a low energy linear accelerator (at 0.6 GeV), operating at 60 Hz, in tandem with two fast cycling booster synchrotrons (at 3.6 GeV), operating at 30 Hz. It is assumed here that considerations of cost and overall system reliability may favor the present design approach over the alternative approach pursued elsewhere, whereby use is made of a high energy linear accelerator in conjunction with a dc accumulation ring. With the knowledge that this alternative design is under active development, it was deliberately decided to favor here the low energy linac-fast cycling booster approach. Clearly, the present design, as developed here, must be carried to the full conceptual design stage in order to facilitate a meaningful technology and cost comparison with alternative designs.

  16. 5 MW pulsed spallation neutron source, Preconceptual design study

    International Nuclear Information System (INIS)

    1994-06-01

    This report describes a self-consistent base line design for a 5 MW Pulsed Spallation Neutron Source (PSNS). It is intended to establish feasibility of design and as a basis for further expanded and detailed studies. It may also serve as a basis for establishing project cost (30% accuracy) in order to intercompare competing designs for a PSNS not only on the basis of technical feasibility and technical merit but also on the basis of projected total cost. The accelerator design considered here is based on the objective of a pulsed neutron source obtained by means of a pulsed proton beam with average beam power of 5 MW, in ∼ 1 μsec pulses, operating at a repetition rate of 60 Hz. Two target stations are incorporated in the basic facility: one for operation at 10 Hz for long-wavelength instruments, and one operating at 50 Hz for instruments utilizing thermal neutrons. The design approach for the proton accelerator is to use a low energy linear accelerator (at 0.6 GeV), operating at 60 Hz, in tandem with two fast cycling booster synchrotrons (at 3.6 GeV), operating at 30 Hz. It is assumed here that considerations of cost and overall system reliability may favor the present design approach over the alternative approach pursued elsewhere, whereby use is made of a high energy linear accelerator in conjunction with a dc accumulation ring. With the knowledge that this alternative design is under active development, it was deliberately decided to favor here the low energy linac-fast cycling booster approach. Clearly, the present design, as developed here, must be carried to the full conceptual design stage in order to facilitate a meaningful technology and cost comparison with alternative designs

  17. Evaluation of the Hydropower Generation Potential of a Dam Using Optimization Techniques: Application to Doma Dam, Nassarawa, in North Central Nigeria

    Directory of Open Access Journals (Sweden)

    Salami Adebayo Wahab

    2017-03-01

    Full Text Available Optimization models have been developed to maximize annual energy generation from the Doma dam, subject to the constraint of releases for irrigation, ecological purposes, the water supply, the maximum yield from the reservoir and reservoir storage. The model was solved with LINGO software for various mean annual inflow exceedence probabilities. Two scenarios of hydropower retrofitting were considered. Scenario 1, with the reservoir inflows at 50%, 75%, and 90% probabilities of exceedence, gives the total annual hydropower as 0.531 MW, 0.450 MW and 0.291 MW, respectively. The corresponding values for scenario 2 were 0.615 MW, 0.507 MW, and 0.346 MW respectively. The study also considered increasing the reservoir’s live storage to 32.63Mm3 by taking part of the flood storage so that the maximum draft increases to 7 Mm3. With this upper limit of storage and draft with reservoir inflows of 50%, 75% and 90% probabilities of exceedence, the hydropower generated increased to 0.609 MW, 0.540 MW, and 0.347 MW respectively for the scenario 1 arrangement, while those of scenario 2 increased to 0.699 MW, 0.579MW and 0.406 MW respectively. The results indicate that the Doma Dam is suitable for the production of hydroelectric power and that its generation potential is between 0.61 MW and 0.70 MW.

  18. A review on earthquake and tsunami hazards of the Sumatran plate boundary: Observing expected and unexpected events after the Aceh-Andaman Mw 9.15 event

    Science.gov (United States)

    Natawidjaja, D.

    2013-12-01

    The 600-km Mentawai megathrust had produced two giant historical earthquakes generating big tsunamies in 1797 and 1833. The SuGAr (Sumatran GPS continuous Array) network, first deployed in 2002, shows that the subduction interface underlying Mentawai Islands and the neighboring Nias section in the north are fully locked, thus confirming their potential hazards. Outreach activities to warn people about earthquake and tsunamies had been started since 4 months prior to the 26 December 2004 in Aceh-Andaman earthquake (Mw 9.15). Later in March 2005, the expected megathrust earthquake (Mw 8.7) hit Nias-Simelue area and killed about 2000 people, releasing the accumulated strain since the previous 1861 event (~Mw 8.5). After then many Mw 7s and smaller events occured in Sumatra, filling areas between and around two giant ruptures and heighten seismicities in neighboring areas. In March 2007, the twin earthquake disaster (Mw 6.3 and Mw 6.4) broke two consecutive segments of the transcurrent Sumatran fault in the Singkarak lake area. Only six month later, in September 2007, the rapid-fire-failures of three consecutive megathrust patches (Mw 8.5, Mw 7.9 and Mw 7.0) ruptured a 250-km-section of the southern part of the Mentawai. It was a big surprise since this particular section is predicted as a very-low coupled section from modelling the SuGAr data, and hence, bypassing the more potential fully coupled section of the Mentawai in between the 2005 and 2007 ruptures. In September 2009, a rare unexpected event (Mw 7.6) suddenly ruptured an intracrustal fault in the subducted slab down under Padang City and killed about 500 people. Padang had been in preparation for the next tsunami but not for strong shakes from near by major earthquake. This event seems to have remotely triggered another Mw 6.7 on the Sumatran fault near kerinci Lake, a few hundred kilometers south of Padang, in less than a day. Just a year later, in November 2010, again an unexpected large slow-slip event of

  19. Dragon project reference design assessment study for a 528 MW (E) thorium cycle high temperature gas cooled reactor

    International Nuclear Information System (INIS)

    Hosegood, S.B.

    1967-05-01

    The report presents an assessment of the feasibility, safety and cost of a large nuclear power station employing a high temperature gas-cooled reactor. A thermal output 1250 MW was chosen for the study, resulting in a net electrical output of 528.34 MW from a single reactor station, or 1056.7 MW from a twin reactor station. A reference design has been developed and is described. The reactor uses a U-235/Th-232/U-233 fuel cycle, on a feed and breed basis. It is believed that such a reactor could be built at an early date, requiring only a relatively modest development programme. Building costs are estimated to be Pound46.66/kW for a single unit station and Pound42.6/kW for a twin station, with power generation costs of 1.67p/kWh and 1.50p/kWh respectively. Optimisation studies have not been carried out and it should be possible to improve on the costs. The design has been made as flexible as possible to allow units of smaller or larger outputs to be designed with a minimum of change. (U.K.)

  20. A 20 MW podded ship underwater electromagnetic signature - the alternative electric field; Signature electromagnetique sous-marine d'un paquebot de 20 MW a pods - le champ electrique alternatif

    Energy Technology Data Exchange (ETDEWEB)

    Lucas, B.; Henocq, H.; Rannou, C. [Delegation Generale pour l' Armement, DET/GESMA, 75 - Paris (France); Albert, Th.; Harpin, D. [ALSTOM Marine (France); Bourguet, S.; Guerin, P. [Institut de Recherche en Electrotechnique et Electronique de Nantes Atlantique, 44 (France)

    2006-03-15

    Today, electric podded propulsion is used for many ships, cruise liners and Navy vessels.This propulsion uses high currents in extremely low frequencies (ELFE); currents flow through electrical network, equipment and pods. These alternative currents could generate important underwater electromagnetic field. GESMA has to quantify the level of this field and its impact on the signature of this kind of ship. Then, GESMA carried out electromagnetic measurements using a multi-sensors underwater and autonomous facility named AMI. It was placed on the route of a 20 MW podded ship, at one hundred meters depth from the surface. Especially, AMI observed an alternative radiated electric field... (authors)

  1. 2 MW 110 GHz ECH heating system for DIII-D

    International Nuclear Information System (INIS)

    Moeller, C.; Prater, R.; Callis, R.; Remsen, D.; Doane, J.; Cary, W.; Phelps, R.; Tupper, M.

    1990-09-01

    A 2 MW 110 GHz ECH system using Varian 0.5 MW gyrotrons is under construction for use on the DIII-D tokamak by late 1991. Most of the components are being design and fabricated at General Atomics, including the gyrotron tanks, superconducting magnets, and transmission line. These components are intended for operation with 10 second pulses and, in the future, with 1 MW gyrotrons. 6 refs., 5 figs

  2. Design and test of a 2.25-MW transformer rectifier assembly

    Science.gov (United States)

    Cormier, R.; Daeges, J.

    1989-01-01

    A new 2.25-MW transformer rectifier assembly was fabricated for DSS-13 at Goldstone, California. The transformer rectifier will provide constant output power of 2.25 MW at any voltage from 31 kV to 125 kV. This will give a new capability of 1 MW of RF power at X-band, provided appropriate microwave tubes are in the power amplifier. A description of the design and test results is presented.

  3. development of 100 mw gas turbine shaft sleeve puller

    African Journals Online (AJOL)

    88888888

    2012-11-03

    Nov 3, 2012 ... different forms of energy, include wave, wind-turbine, solar-thermal ... tor, the torque converter, the gas turbine, the gearbox and the generator [2]. ..... on June 4, 2012. 6. Siswanto, Power Generation Project Experiences,.

  4. Modal Analysis on Fluid-Structure Interaction of MW-Level Vertical Axis Wind Turbine Tower

    OpenAIRE

    Tan Jiqiu; Zhong Dingqing; Wang Qiong

    2014-01-01

    In order to avoid resonance problem of MW-level vertical axis wind turbine induced by wind, a flow field model of the MW-level vertical axis wind turbine is established by using the fluid flow control equations, calculate flow’s velocity and pressure of the MW-level vertical axis wind turbine and load onto tower’s before and after surface, study the Modal analysis of fluid-structure interaction of MW-level vertical axis wind turbine tower. The results show that fluid-structure interaction fie...

  5. Environmental summary document for the Republic Geothermal, Inc. application for a geothermal loan guaranty project: 64 MW well field and 48 MW (net) geothermal power plant

    Energy Technology Data Exchange (ETDEWEB)

    Layton, D.W.; Powers, D.J.; Leitner, P.; Crow, N.B.; Gudiksen, P.H.; Ricker, Y.E.

    1979-07-01

    A comprehensive review and analysis is provided of the environmental consequences of (1) guaranteeing a load for the completion of the 64 MW well field and the 48 MW (net) power plant or (2) denying a guaranteed load that is needed to finish the project. Mitigation measures are discussed. Alternatives and their impacts are compared and some discussion is included on unavoidable adverse impacts. (MHR)

  6. The first test results of the new MAN 6 MW gas turbine; Erste Erprobungsergebnisse zur neuen 6-MW-MAN-Gasturbine

    Energy Technology Data Exchange (ETDEWEB)

    Beukenberg, Markus; Wiedermann, Alexander; Orth, Ulrich; Aschenbruck, Emil; Reiss, Frank [MAN Diesel und Turbo SE, Oberhausen (Germany)

    2011-07-01

    The development of a completely new series of gas turbines requires significant capital, resources and know-how. MAN Diesel and Turbo strategically decided to create a gas turbine in the 6 MW class. The construction of the gas turbine has been on the basis of opportunities in current and future markets and the positioning of competition, this has determined the characteristics and technical parameters which have been optimised in the 6 MW design. (orig.)

  7. Assessment of levelized cost of electricity for a 10-MW solar chimney power plant in Yinchuan China

    International Nuclear Information System (INIS)

    Guo, Penghua; Zhai, Yaxin; Xu, Xinhai; Li, Jingyin

    2017-01-01

    Highlights: • An unsteady model is proposed for annual power generation prediction of SCPPs. • LCOE of a 10-MW SCPP in China is estimated through a cost benefit analysis. • Cost advantage and concessional loan under conditions in China are considered. • SCPP is proven to be economically feasible under favorable conditions in China. - Abstract: Solar chimney power plant (SCPP) is a promising renewable energy technology that needs policy support and market cultivation at the early stage of its development. An accurate prediction of the levelized cost of electricity (LCOE) can be used as basis for crafting effective support policies. This study presents an unsteady theoretical model that considers hourly meteorological data and soil heat storage in estimating the annual power generation of an SCPP. A cost benefit model is adopted to calculate the LCOE of a 10-MW SCPP in Yinchuan, a representative geographical location in the Northwestern region of China. By considering the cost advantage of China, the concessional loan, as well as the low operation and maintenance cost, the LCOE of the SCPP is estimated to be 0.4178 Yuan/kWh, which can compete with those of wind power and solar PV in China. This work lays a good foundation for the accurate prediction of power generation and provides a reference for the Chinese government in crafting effective support policies for SCPPs.

  8. ENGINEERING DESIGN OF THE EURISOL MULTI-MW SPALLATION TARGET

    CERN Document Server

    Adonai Herrera-Martinez*, Yacine Kadi, Morteza Ashrafi-Nik, Karel Samec, Janis Freibergs, Ernests Platacis

    The European Isotope Separation On-Line Radioactive Ion Beam project (EURISOL) is set to design the ‘next-generation’ European Isotope Separation On-Line (ISOL) Radioactive Ion Beam (RIB) facility. It will extend and amplify current research on nuclear physics, nuclear astrophysics and fundamental interactions beyond the year 2010. In EURISOL, four target stations are foreseen, three direct targets of approximately 100 kW of beam power and one multi-MW target assembly, all driven by a high-power particle accelerator. In this high power target station, high-intensity RIBs of neutron-rich isotopes will be obtained by inducing fission in several actinide targets surrounding a liquid metal spallation neutron source. This article summarises the work carried out within Task 2 of the EURISOL Design Study, with special attention to the coupled neutronics of the mercury proton-to-neutron converter and the fission targets. The overall performance of the facility, which will sustain fast neutron fluxes of the order ...

  9. NASA Ames Research Center 60 MW Power Supply Modernization

    Science.gov (United States)

    Choy, Yuen Ching; Ilinets, Boris V.; Miller, Ted; Nagel, Kirsten (Technical Monitor)

    2001-01-01

    The NASA Ames Research Center 60 MW DC Power Supply was built in 1974 to provide controlled DC power for the Thermophysics Facility Arc Jet Laboratory. The Power Supply has gradually losing reliability due to outdated technology and component life limitation. NASA has decided to upgrade the existing rectifier modules with contemporary high-power electronics and control equipment. NASA plans to complete this project in 2001. This project includes a complete replacement of obsolete thyristor stacks in all six rectifier modules and rectifier bridge control system. High power water-cooled thyristors and freewheeling diodes will be used. The rating of each of the six modules will be 4000 A at 5500 V. The control firing angle signal will be sent from the Facility Control System to six modules via fiberoptic cable. The Power Supply control and monitoring system will include a Master PLC in the Facility building and a Slave PLC in each rectifier module. This system will also monitor each thyristor level in each stack and the auxiliary equipment.

  10. Power Electronic System for Multi-MW PV sites

    DEFF Research Database (Denmark)

    Paasch, Kasper

    in Sønderborg (DK) was implemented. A total of 17 PV-inverters have been monitored during a period exceeding one year and the recorded data constitutes the basis of this investigation. A part of the 2.1 MW PV plant was reconfigured to emulate the behavior of a central-inverter and solar panels distributed over...... a distance of 160 m. In parallel a string based inverter configuration was established with solar panels at the same locations. An analysis of irradiation data recorded during the test period showed that non-uniform irradiance due to moving clouds is expected to influence the PV plants for less than 4.......4%. A portable IV-scanning instrument for the fast long term characterization of solar panels was developed as part of the project. Each second a sweep of the IV-characteristics of a solar panel is performed and the result stored for later analysis. The instrument is based on an active load, is optimized...

  11. Design of a 100 MW X-band klystron

    International Nuclear Information System (INIS)

    Eppley, K.

    1989-02-01

    Future linear colliders will require klystrons with higher peak power at higher frequency than are currently in use. SLAC is currently designing a 100 MW klystron at 11.4 GHz as a prototype for such a tube. The gun has been designed for 440 KV and 510 amps. Transporting this beam through a 5 mm radius X-band drift tube presents the major design problem. The area convergence ratio of 190 to one is over ten times higher than is found in conventional klystrons. Even with high magnetic fields of 6 to 7 kilogauss careful matching is required to prevent excessive scalloping. Extensive EGUN and CONDOR simulations have been made to optimize the transmission and rf efficiency. The EGUN simulations indicate that better matching is possible by using resonant magnetic focusing. CONDOR calculations indicate efficiencies of 45 percent are possible with a double output cavity. We will discuss the results of the simulations and the status of the experimental program. 3 refs., 6 figs., 2 tabs

  12. Design of a 100 MW X-band klystron

    Science.gov (United States)

    Eppley, Kenneth

    1989-02-01

    Future linear colliders will require klystrons with higher peak power at higher frequency than are currently in use. SLAC is currently designing a 100 MW klystron at 11.4 GHz as a prototype for such a tube. The gun has been designed for 440 kV and 510 amps. Transporting this beam through a 5 mm radius X-band drift tube presents the major design problem. The area convergence ratio of 190 to one is over ten times higher than is found in conventional klystrons. Even with high magnetic fields of 6 to 7 kilogauss careful matching is required to prevent excessive scalloping. Extensive EGUN and CONDOR simulations have been made to optimize the transmission and RF efficiency. The EGUN simulations indicate that better matching is possible by using resonant magnetic focusing. CONDOR calculations indicate efficiencies of 45 percent are possible with a double output cavity. We will discuss the results of the simulations and the status of the experimental program.

  13. Probabilistic safety assessment for Balakovo 1000 MW NPP

    International Nuclear Information System (INIS)

    Foden, R.W.

    1995-01-01

    In July 1993 the Commission of the European Communities (CEC) placed a contract with NNC Ltd (National Nuclear Corporation) for performing a Probabilistic Safety Assessment (PSA) for a 1000 MW NPP in the Russian Federation. The contract is part (Project 3.1) of the 1991 TACIS (Technical Assistance to the CIS) programme. This paper describes the objectives and scope of the Project and provides a description of the progress that has been made. For this Project, NNC is the leader of a Consortium of Western European companies that has been formed to undertake this Project and other Projects in the TACIS 91 programme. NNC therefore has overall responsibility for the coordination and management of the complete PSA Project. Other members of the Consortium involved in this Project are Empresarios Agrupados from Spain, Belgatom from Belgium and AEA-Technology from the UK. The analytical work for the Project is performed by the Russian Company Atomenergoproekt in Moscow, under contract to NNC. The official recipient institution for the results of the Project is the Russian Utility, Rosenergatom. The NPP chosen to be the subject of the Project is the Balakovo Unit 4 VVER 1000. (author)

  14. Experiences and results from Elkraft 1 MW wind turbine

    Energy Technology Data Exchange (ETDEWEB)

    Raben, N; Jensen, F V [SEAS Distribution A.m.b.A., Wind Power Dept., Haslev (Denmark); Oeye, S [DTU, Inst. for Energiteknik, Lyngby (Denmark); Markkilde Petersen, S; Antoniou, I [Risoe National Lab., Wind Energy and Atmospheric Physics Dept., Roskilde (Denmark)

    1999-03-01

    The Elkraft 1 MW Demonstration wind turbine was at the time of installation in 1993 the largest stall controlled wind turbine in the world. It was constructed to allow accurate comparison of two different forms of operation: pitch control and stall control. A comprehensive programme for the investigation of the two operation modes was established. This paper presents the main experiences from five years of operation and measurements. For a three-year period the wind turbine was in operation in stall controlled mode. During this period the turbine faced problems of various significance. Especially lightning strikes and unusually poor wind conditions caused delays of the project. In early 1997, the wind turbine was modified to enable pitch controlled operation. The gearbox ratio was changed in order to allow higher rotor speed, the hydraulic system was altered and new control software was installed. Tests were carried out successfully during the spring of 1997 and the wind turbine has since been operating as a pitch controlled wind turbine. The most significant events and problems are presented and commented in this paper along with results from the measurement programme. The results cover both stall and pitch controlled operation and include power curves, annual energy production, structural loads, fatigue loads etc. (au) 10 refs.

  15. From concept to construction: a 15 MW small hydro project

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, S.; Neegan, K.

    1995-12-31

    An audio recording of an address by Chief Stanley Stephens and Deputy-Chief Ken Neegan of the Constance Lake First Nation, at the Renewable Energy Commercial Trade Show and Markets Conference was presented. The speech concerned development of a 15 MW hydro project on the reservation. Stephens recalled how initial opposition was overcome by addressing simple misconceptions about the project. The project was initiated by the Ontario Energy Corporation with a series of community discussions which addressed environmental impacts, and benefits that would result from the project. Neegan explained that after deliberation and negotiations, the Constance Lake First Nation was pleased with the project. This project was evidence that sound partnership could be formed between First Nations and hydro developers, while preserving respect for `Mother Earth` in the process. Trust between the community, the developers and government was considered to be the critical component of the project. Sound legal, technical, environmental and financial information was also indispensable in allowing the Constance Lake First Nation to make its decision to proceed with the project.

  16. From concept to construction: a 15 MW small hydro project

    International Nuclear Information System (INIS)

    Stephens, S.; Neegan, K.

    1995-01-01

    An audio recording of an address by Chief Stanley Stephens and Deputy-Chief Ken Neegan of the Constance Lake First Nation, at the Renewable Energy Commercial Trade Show and Markets Conference was presented. The speech concerned development of a 15 MW hydro project on the reservation. Stephens recalled how initial opposition was overcome by addressing simple misconceptions about the project. The project was initiated by the Ontario Energy Corporation with a series of community discussions which addressed environmental impacts, and benefits that would result from the project. Neegan explained that after deliberation and negotiations, the Constance Lake First Nation was pleased with the project. This project was evidence that sound partnership could be formed between First Nations and hydro developers, while preserving respect for 'Mother Earth' in the process. Trust between the community, the developers and government was considered to be the critical component of the project. Sound legal, technical, environmental and financial information was also indispensable in allowing the Constance Lake First Nation to make its decision to proceed with the project

  17. Parametric Analysis of a Two-Shaft Aeroderivate Gas Turbine of 11.86 MW

    Directory of Open Access Journals (Sweden)

    R. Lugo-Leyte

    2015-08-01

    Full Text Available The aeroderivate gas turbines are widely used for power generation in the oil and gas industry. In offshore marine platforms, the aeroderivative gas turbines provide the energy required to drive mechanically compressors, pumps and electric generators. Therefore, the study of the performance of aeroderivate gas turbines based on a parametric analysis is relevant to carry out a diagnostic of the engine, which can lead to operational as well as predictive and/or corrective maintenance actions. This work presents a methodology based on the exergetic analysis to estimate the irrevesibilities and exergetic efficiencies of the main components of a two-shaft aeroderivate gas turbine. The studied engine is the Solar Turbine Mars 100, which is rated to provide 11.86 MW. In this engine, the air is compressed in an axial compressor achieving a pressure ratio of 17.7 relative to ambient conditions and a high pressure turbine inlet temperature of 1220 °C. Even if the thermal efficiency associated to the pressure ratio of 17.7 is 1% lower than the maximum thermal efficiency, the irreversibilities related to this pressure ratio decrease approximately 1 GW with respect to irreversibilities of the optimal pressure ratio for the thermal efficiency. In addition, this paper contributes to develop a mathematical model to estimate the high turbine inlet temperature as well as the pressure ratio of the low and high pressure turbines.

  18. Structural design study of a proton beam window for a 1-MW spallation neutron source

    CERN Document Server

    Teraoku, T; Ishikura, S; Kaminaga, M; Maekawa, F; Meigo, S I; Terada, A

    2003-01-01

    A 1-MW spallation neutron source aiming at materials and life science researches will be constructed under the JAERI-KEK High-intensity Proton Accelerator Project (J-PARC). A proton beam passes through a proton beam window, and be injected into a target of the neutron source. The proton beam window functions as a boundary wall between a high vacuum area in the proton beam line and a helium atmosphere at about atmospheric pressure in a helium vessel which contains the target and moderators. The proton beam window is cooled by light water because high heat-density is generated in the window material by interactions with the proton beam. Then, uniformity of the water flow is requested at the window to suppress a hot-spot that causes excessive thermal stress and cooling water boiling. Also, the window has to be strong enough in its structure for inner stress due to water pressure and thermal stress due to heat generation. In this report, we propose two types of proton beam windows; one flat-type that is easy to m...

  19. EURISOL-DS Multi-MW Target Neutronic Calculations for the Baseline Configuration of the Multi-MW Target

    CERN Document Server

    Herrera-Martínez, A

    2006-01-01

    This document summarises the study performed within the Task #2 of the European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study (EURISOL DS) [1] to design the Multi-MW proton-to-neutron converter. A preliminary study [2] was carried out in order to understand the nature of the interactions taking place in the proton-to-neutron converter and their impact on the design of the facility. Namely, the target dimensions and material composition, type of incident particle, its energy and the beam profile were analysed in the aforementioned technical note, and their optimum values were suggested in the conclusions. The present work is based on the results of the previous study and uses the same methodology, namely Monte Carlo simulations with FLUKA [3]. This note describes the performance of a Hg target design and addresses more detailed issues, such as the composition of the fission target and use of a neutron reflector. It also attempts to integrate those components together and estimate the wh...

  20. Design features of Beijing Shijingshan 3 x 200 MW cogeneration plant

    International Nuclear Information System (INIS)

    Li, T.X.; Ou, Y.Z.

    1991-01-01

    This paper describes the design feature of Beijing Shijingshan 3 x 200 MW Cogeneration Plant. The design optimized the scheme and system of 200 MW units for heating. The cogeneration plant has achieved comprehensive economic benefit in energy saving and environmental pollution reduction

  1. Conceptual Nuclear Design of a 20 MW Multipurpose Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Seo, Chul Gyo; Kim, Hak Sung; Park, Cheol [KAERI, Daejeon (Korea, Republic of); Nghiem, Huynh Ton; Vinh, Le Vinh; Dang, Vo Doan Hai [Dalat Nuclear Research Reactor, Hanoi (Viet Nam)

    2007-08-15

    A conceptual nuclear design of a 20 MW multi-purpose research reactor for Vietnam has been jointly done by the KAERI and the DNRI (VAEC). The AHR reference core in this report is a right water cooled and a heavy water reflected open-tank-in-pool type multipurpose research reactor with 20 MW. The rod type fuel of a dispersed U{sub 3}Si{sub 2}-Al with a density of 4.0 gU/cc is used as a fuel. The core consists of fourteen 36-element assemblies, four 18-element assemblies and has three in-core irradiation sites. The reflector tank filled with heavy water surrounds the core and provides rooms for various irradiation holes. Major analyses have been done for the relevant nuclear design parameters such as the neutron flux and power distributions, reactivity coefficients, control rod worths, etc. For the analysis, the MCNP, MVP, and HELIOS codes were used by KAERI and DNRI (VAEC). The results by MCNP (KAERI) and MVP (DNRI) showed good agreements and can be summarized as followings. For a clean, unperturbed core condition such that the fuels are all fresh and there are no irradiation holes in the reflector region, the fast neutron flux (E{sub n}{>=}1.0 MeV) reaches 1.47x10{sup 14} n/cm{sup 2}s and the maximum thermal neutron flux (E{sub n}{<=}0.625 eV) reaches 4.43x10{sup 14} n/cm{sup 2}s in the core region. In the reflector region, the thermal neutron peak occurs about 28 cm far from the core center and the maximum thermal neutron flux is estimated to be 4.09x10{sup 14} n/cm{sup 2}s. For the analysis of the equilibrium cycle core, the irradiation facilities in the reflector region were considered. The cycle length was estimated as 38 days long with a refueling scheme of replacing three 36-element fuel assemblies or replacing two 36-element and one 18-element fuel assemblies. The excess reactivity at a BOC was 103.4 mk, and 24.6 mk at a minimum was reserved at an EOC. The assembly average discharge burnup was 54.6% of initial U-235 loading. For the proposed fuel management

  2. Development of a 2 MW relativistic backward wave oscillator

    Indian Academy of Sciences (India)

    In this paper, a high power relativistic backward wave oscillator (BWO) experiment is reported. A 230 keV, 2 kA, 150 ns relativistic electron beam is generated using a Marx generator. The beam is then injected into a hollow rippled wall metallic cylindrical tube that forms a slow wave structure. The beam is guided using an ...

  3. TRIGA 14 MW spent fuel shipment to USA

    International Nuclear Information System (INIS)

    Toma, C.; Barbos, D.; Preda, M.; Covaci, St.; Ciocanescu, M.

    2008-01-01

    Romania has begun to convert Pitesti TRIGA 14 MW reactor having HEU fuel in its first loading and has agreed to complete conversion of the reactor to LEU fuel by May 12, 2006. Thus it became possible to benefit of US policy as set forth in the Record of Decision (ROD) issued by the Department of Energy (DOE ) on May 13 , 1996 directed for acceptance, management and disposition of the Authorized Material which has been discharged from the foreign research reactors. Consequently, United States, DOE Idaho Operations Office and Institute for Nuclear Research at Pitesti, Romania have mutually agreed the terms and conditions set forth in a contract applicable to the receipt of the Authorized Material. Irradiated and spent nuclear fuel rods from TRIGA reactor containing uranium enriched in the United States that have met the requirements set forth in the Environmental Impact Statement and the ROD have been designated as 'Authorized Material' and transferred to Idaho National Engineering and Environmental Laboratory (INEEL)- USA during the summer of 1999 in a joint shipment. 267 TRIGA spent fuel rods loaded in a Legal Weight Truck Shipping Cask belonging to the NAC International have been transported through an overland truck route from Pitesti, Romania to Koper, Slovenia and from there it was shipped to USA. The paper has the following contents: 1.Introduction; 2.Fuel rods selection; 3.Fuel rods characterization; 4.Evaluation of TRIGA fuel in wet storage; 5.Fuel rods transfer from TRIGA pool to the transport cask; 6.Supporting documentation for transfer approval; 7. Conclusions. In conclusion one is stressed that, on site fuel evaluation process evidenced the existence of very good running and storage conditions in reactor pool during reactor operation and fuel storage. Only one fuel rod had to be packaged prior to placement in the shipping cask because of damaged cladding during negligent handling

  4. Supercontinuum Generation in a Photonic Crystal Fibre

    Institute of Scientific and Technical Information of China (English)

    YAN Pei-Guang; RUAN Shuang-Chen; LIN Hao-Jia; DU Chen-Lin; YU Yong-Qin; LU Ke-Cheng; YAO Jian-Quan

    2004-01-01

    @@ Nearly 1000-nm broad continuum from 390nm to 1370nm is generated in a 2-m long photonic crystal fibre. The maximum total power of supercontinuum is measured to be 60mW with the pumping power of 800mW output from a 200-fs Ti:sapphire laser. The evolution of the pumping light into supercontinuum is experimentally studied in detail. It is found that the mechanism for supercontinuum generation has direct relations with Raman effect and soliton effect, and the four-wave mixing plays an important role in the last phase of the supercontinuum generation.

  5. Conceptual design of a 24--32 MW radially-cooled insert for a ≥45 T hybrid system

    International Nuclear Information System (INIS)

    Weggel, R.J.; Hake, M.E.; Stejskal, V.

    1994-01-01

    The FBNML is designing and will fabricate a radially-cooled insert magnet to generate 70% of the field of a system, Hybrid V, to surpass 45 T in a 32 mm bore. The insert is to have an overall diameter and a maximum active coil length of 610 mm. With a background field of 14 T the system should generate 47 T at 24 MW and nearly 49 T at 32 MW. The peak stress is extremely high, calling for conductors such as Be-Cu (UNS C17510) and 24% Ag-Cu with strengths up to 1,100 MPa. The peak heat flux density also is high, nearly 12 W/mm 2 . Because the water is coldest and its velocity highest where the heat flux is highest, however, the peak temperature is only 80 C. The water flow is ∼ 200 l/s at 27 atm. The system is to be very user friendly. Access is completely unobstructed at the top. Insert removal leaves the plumbing and electrical connections intact. The massive and expensive outer coils should be long lived, the inner coil easily replaceable. During an inner coil burnout, a sleeve intercepts arcing from the inner coil to the middle one, reducing burnout severity and fault loads. The insert should be a worthy successor to those of the FBNML's world-record holding systems, Hybrids II and III

  6. Nuclear research reactor 0.5 to 3 MW

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-05-15

    This nuclear reactor has been designed for radioisotope production, basic and applied research in reactor physics and nuclear engineering, neutron-beam experimentation, irradiation of various materials and training of scientific and technical personnel. It is located in the 'Production Area' of the Nuclear Technology Center. It is equipped with the necessary facilities for large-scale production of radioisotopes to be used in medicine as well as for other scientific and industrial purposes. In addition, it has a Neutronography Facility and the required equipment to perform Neutron-Activation Analysis. It is an open pool-type reactor, moderated and cooled with light water, fuelled with 20% enriched uranium. Its reflector are graphite and water. It has plate-type fuel elements clad in aluminium. The reactor core is located near the bottom of the demineralized water pool. It includes fuel elements, reflector and sample-holding devices for materials to be irradiated. This kind of configuration, which is widely used in research reactors, provides a high degree of safety since it prevents the core from becoming exposed under any circumstance and does not require any cooling system during reactor shutdown. Power output is between 0.5 to 3 MW{sub TH}, with a minimum thermal neutron flux of approx, 10{sup 13} n/cm{sup 2}{center_dot}sec, at irradiation zone almost with no modifications. Heat extraction is achieved by means of a cooling circuit which comprises two circulation pumps and a plate-type heat exchanger. Final heat dissipation to the atmosphere is performed through another cooling circuit which includes two circulation pumps and a cooling tower. Reactor control is accomplished with five neutron-absorbing rods positioned by means of especially designed elements and governed by the reactor's instrumentation and control system. Should an abnormal situation arise, gravity causes the rods to fall automatically, thus extinguishing the nuclear reaction. The reactor

  7. Nuclear research reactor 0.5 to 3 MW

    International Nuclear Information System (INIS)

    1992-05-01

    This nuclear reactor has been designed for radioisotope production, basic and applied research in reactor physics and nuclear engineering, neutron-beam experimentation, irradiation of various materials and training of scientific and technical personnel. It is located in the 'Production Area' of the Nuclear Technology Center. It is equipped with the necessary facilities for large-scale production of radioisotopes to be used in medicine as well as for other scientific and industrial purposes. In addition, it has a Neutronography Facility and the required equipment to perform Neutron-Activation Analysis. It is an open pool-type reactor, moderated and cooled with light water, fuelled with 20% enriched uranium. Its reflector are graphite and water. It has plate-type fuel elements clad in aluminium. The reactor core is located near the bottom of the demineralized water pool. It includes fuel elements, reflector and sample-holding devices for materials to be irradiated. This kind of configuration, which is widely used in research reactors, provides a high degree of safety since it prevents the core from becoming exposed under any circumstance and does not require any cooling system during reactor shutdown. Power output is between 0.5 to 3 MW TH , with a minimum thermal neutron flux of approx, 10 13 n/cm 2 ·sec, at irradiation zone almost with no modifications. Heat extraction is achieved by means of a cooling circuit which comprises two circulation pumps and a plate-type heat exchanger. Final heat dissipation to the atmosphere is performed through another cooling circuit which includes two circulation pumps and a cooling tower. Reactor control is accomplished with five neutron-absorbing rods positioned by means of especially designed elements and governed by the reactor's instrumentation and control system. Should an abnormal situation arise, gravity causes the rods to fall automatically, thus extinguishing the nuclear reaction. The reactor building has a ventilation

  8. Generation and management of medical waste in Serbia: A review

    Directory of Open Access Journals (Sweden)

    Šerović Radmila M.

    2016-01-01

    Full Text Available This study presents generation, quantities and medical waste (MW management in Serbia. It represents assessment methods and total annual MW generation by categories. It was concluded that pharmaceutical (64% and infectious (32% MW production is the largest. According to available data, MW management in Serbia is currently at low level, except when it comes to infectious waste. Research proposed simpler treatment methods in existing autoclaves and complex methods (incineration and plasma-pyrolysis, as well as short-term and long-term solutions. Predicted MW growing amount requires existing capacity increase for processing and new solutions application. Installed autoclaves capacity could be increased by increasing working time, in order to avoid additional investment. However, treatment in autoclave is only suitable for infectious MW. For other medical waste, which main fractions are pharmaceutical and chemical waste, there is no infrastructure. As temporary solution, pharmaceutical waste is treated abroad which in longer period is not financially feasible. Considering that MW treatment in Serbia currently is based on health facilities network equipped with autoclaves, as central (CTF and local (LTF treatments facilities for infectious waste treatment, it is recommended additional capacity implementation for treatment of non-infectious waste to this network, with simultaneous management level optimization of whole MW.

  9. Modal Analysis on Fluid-Structure Interaction of MW-Level Vertical Axis Wind Turbine Tower

    Directory of Open Access Journals (Sweden)

    Tan Jiqiu

    2014-05-01

    Full Text Available In order to avoid resonance problem of MW-level vertical axis wind turbine induced by wind, a flow field model of the MW-level vertical axis wind turbine is established by using the fluid flow control equations, calculate flow’s velocity and pressure of the MW-level vertical axis wind turbine and load onto tower’s before and after surface, study the Modal analysis of fluid-structure interaction of MW-level vertical axis wind turbine tower. The results show that fluid-structure interaction field of MW- level vertical axis wind turbine tower has little effect on the modal vibration mode, but has a great effect on its natural frequency and the maximum deformation, and the influence will decrease with increasing of modal order; MW-level vertical axis wind turbine tower needs to be raised the stiffness and strength, its structure also needs to be optimized; In the case of satisfy the intensity, the larger the ratio of the tower height and wind turbines diameter, the more soft the MW-level vertical axis wind turbine tower, the lower its frequency.

  10. Reaction of the immune system to low-level RF/MW exposures

    International Nuclear Information System (INIS)

    Szmigielski, Stanislaw

    2013-01-01

    Radiofrequency (RF) and microwave (MW) radiation have been used in the modern world for many years. The rapidly increasing use of cellular phones in recent years has seen increased interest in relation to the possible health effects of exposure to RF/MW radiation. In 2011 a group of international experts organized by the IARC (International Agency for Research on Cancer in Lyon) concluded that RF/MW radiations should be listed as a possible carcinogen (group 2B) for humans. The incomplete knowledge of RF/MW-related cancer risks has initiated searches for biological indicators sensitive enough to measure the “weak biological influence” of RF/MWs. One of the main candidates is the immune system, which is able to react in a measurable way to discrete environmental stimuli. In this review, the impacts of weak RF/MW fields, including cell phone radiation, on various immune functions, both in vitro and in vivo, are discussed. The bulk of available evidence clearly indicates that various shifts in the number and/or activity of immunocompetent cells are possible, however the results are inconsistent. For example, a number of lymphocyte functions have been found to be enhanced and weakened within single experiments based on exposure to similar intensities of MW radiation. Certain premises exist which indicate that, in general, short-term exposure to weak MW radiation may temporarily stimulate certain humoral or cellular immune functions, while prolonged irradiation inhibits the same functions

  11. Energy and Exergy Analysis of 210 MW Jamshoro Thermal Power Plant

    Directory of Open Access Journals (Sweden)

    Muhib Ali Rajper

    2016-04-01

    Full Text Available In this paper, thermodynamic analysis of 210 MW dual-fire, subcritical, reheat steam power plant, situated near Jamshoro, Pakistan has been performed. Firstly, the plant is modeled by EES (Engineering Equation Solver software. Moreover; a parametric study is performed to assess the impacts of various operating parameters on the performance. The net power output, energy efficiency and exergy efficiency are considered as performance parameters of the plant whereas, condenser pressure, main steam pressure and main steam temperature are nominated as operating parameters. According to the results, the net power output, energy efficiency and exergy efficiency are determined as 186.5 MW, 31.37% and 30.41% respectively, under design operating conditions. The condenser contributed a major share in the total energy loss i.e. 280 MW (68.7% followed by boiler with 89 MW (21.8%. The major exergy destructing area is found in the boiler with 350 MW (82.11% of the total exergy destruction followed by turbine with 43.1 MW (10.12% and condenser 12 MW (5.74 %. According to the parametric study, variation in operating parameters had great influence on the plant performance

  12. Reaction of the immune system to low-level RF/MW exposures

    Energy Technology Data Exchange (ETDEWEB)

    Szmigielski, Stanislaw, E-mail: szmigielski@wihe.waw.pl

    2013-06-01

    Radiofrequency (RF) and microwave (MW) radiation have been used in the modern world for many years. The rapidly increasing use of cellular phones in recent years has seen increased interest in relation to the possible health effects of exposure to RF/MW radiation. In 2011 a group of international experts organized by the IARC (International Agency for Research on Cancer in Lyon) concluded that RF/MW radiations should be listed as a possible carcinogen (group 2B) for humans. The incomplete knowledge of RF/MW-related cancer risks has initiated searches for biological indicators sensitive enough to measure the “weak biological influence” of RF/MWs. One of the main candidates is the immune system, which is able to react in a measurable way to discrete environmental stimuli. In this review, the impacts of weak RF/MW fields, including cell phone radiation, on various immune functions, both in vitro and in vivo, are discussed. The bulk of available evidence clearly indicates that various shifts in the number and/or activity of immunocompetent cells are possible, however the results are inconsistent. For example, a number of lymphocyte functions have been found to be enhanced and weakened within single experiments based on exposure to similar intensities of MW radiation. Certain premises exist which indicate that, in general, short-term exposure to weak MW radiation may temporarily stimulate certain humoral or cellular immune functions, while prolonged irradiation inhibits the same functions.

  13. Full moment tensors for small events (Mw < 3) at Uturuncu volcano, Bolivia

    Science.gov (United States)

    Alvizuri, Celso; Tape, Carl

    2016-09-01

    We present a catalogue of full seismic moment tensors for 63 events from Uturuncu volcano in Bolivia. The events were recorded during 2011-2012 in the PLUTONS seismic array of 24 broad-band stations. Most events had magnitudes between 0.5 and 2.0 and did not generate discernible surface waves; the largest event was Mw 2.8. For each event we computed the misfit between observed and synthetic waveforms, and we used first-motion polarity measurements to reduce the number of possible solutions. Each moment tensor solution was obtained using a grid search over the 6-D space of moment tensors. For each event, we show the misfit function in eigenvalue space, represented by a lune. We identify three subsets of the catalogue: (1) six isotropic events, (2) five tensional crack events, and (3) a swarm of 14 events southeast of the volcanic centre that appear to be double couples. The occurrence of positively isotropic events is consistent with other published results from volcanic and geothermal regions. Several of these previous results, as well as our results, cannot be interpreted within the context of either an oblique opening crack or a crack-plus-double-couple model. Proper characterization of uncertainties for full moment tensors is critical for distinguishing among physical models of source processes.

  14. Power conversion and quality of the Santa Clara 2 MW direct carbonate fuel cell demonstration plant

    Energy Technology Data Exchange (ETDEWEB)

    Skok, A.J. [Fuel Cell Engineering Corp., Danbury, CT (United States); Abueg, R.Z. [Basic Measuring Instruments, Santa Clara, CA (United States); Schwartz, P. [Fluor Daniel, Inc., Irvine, CA (United States)] [and others

    1996-12-31

    The Santa Clara Demonstration Project (SCDP) is the first application of a commercial-scale carbonate fuel cell power plant on a US electric utility system. It is also the largest fuel cell power plant ever operated in the United States. The 2MW plant, located in Santa Clara, California, utilizes carbonate fuel cell technology developed by Energy Research Corporation (ERC) of Danbury, Connecticut. The ultimate goal of a fuel cell power plant is to deliver usable power into an electrical distribution system. The power conversion sub-system does this for the Santa Clara Demonstration Plant. A description of this sub-system and its capabilities follows. The sub-system has demonstrated the capability to deliver real power, reactive power and to absorb reactive power on a utility grid. The sub-system can be operated in the same manner as a conventional rotating generator except with enhanced capabilities for reactive power. Measurements demonstrated the power quality from the plant in various operating modes was high quality utility grade power.

  15. Biblis 1,300 MW unit B in operation for thirty years

    International Nuclear Information System (INIS)

    Lauer, H.

    2006-01-01

    Over the past thirty years, unit B of the Biblis nuclear power station has contributed towards safe, reliable and non-polluting electricity generation. Unit B was the first 1,300 MW unit in the world confirming the good experience accumulated in the construction and operation of plants this size. It laid the foundation for the advanced development of nuclear power plants up to the convoy line. The good availability this plant has achieved in its operating cycles proves the mature state of technology and the high level of qualification and motivation of the power plant staff and the personnel of external firms contracted to work for Biblis. Biblis B has served as a reference plant in German nuclear safety research, demonstrating that units this size can be operated safely. Unit B is also living proof of the possibility to raise nuclear power plants built in the seventies to the current state of the art by implementing the appropriate backfitting and modernization measures. Today, Biblis B is operated at a safety level clearly higher than that to be achieved for new plants internationally. This is also evident from comparison with the guiding values for the safety of new facilities as published by the International Atomic Energy Agency (IAEA). (orig.)

  16. Statistical fault diagnosis of wind turbine drivetrain applied to a 5MW floating wind turbine

    Science.gov (United States)

    Ghane, Mahdi; Nejad, Amir R.; Blanke, Mogens; Gao, Zhen; Moan, Torgeir

    2016-09-01

    Deployment of large scale wind turbine parks, in particular offshore, requires well organized operation and maintenance strategies to make it as competitive as the classical electric power stations. It is important to ensure systems are safe, profitable, and cost-effective. In this regards, the ability to detect, isolate, estimate, and prognose faults plays an important role. One of the critical wind turbine components is the gearbox. Failures in the gearbox are costly both due to the cost of the gearbox itself and also due to high repair downtime. In order to detect faults as fast as possible to prevent them to develop into failure, statistical change detection is used in this paper. The Cumulative Sum Method (CUSUM) is employed to detect possible defects in the downwind main bearing. A high fidelity gearbox model on a 5-MW spar-type wind turbine is used to generate data for fault-free and faulty conditions of the bearing at the rated wind speed and the associated wave condition. Acceleration measurements are utilized to find residuals used to indirectly detect damages in the bearing. Residuals are found to be nonGaussian, following a t-distribution with multivariable characteristic parameters. The results in this paper show how the diagnostic scheme can detect change with desired false alarm and detection probabilities.

  17. Layered Multi-mode Optimal Control Strategy for Multi-MW Wind Turbine

    Institute of Scientific and Technical Information of China (English)

    KONG Yi-gang; WANG Zhi-xin

    2008-01-01

    The control strategy is one of the most important renewable technology, and an increasing number of multi-MW wind turbines are being developed with a variable speed-variable pitch (VS-VP) technology. The main objective of adopting a VS-VP technology is to improve the fast response speed and capture maximum energy. But the power generated by wind turbine changes rapidly because of the centinuous fluctuation of wind speed and direction. At the same time, wind energy conversion systems are of high order, time delays and strong nonlinear characteristics because of many uncertain factors. Based on analyzing the all dynamic processes of wind turbine, a kind of layered multi-mode optimal control strategy is presented which is that three control strategies: bang-bang, fuzzy and adaptive proportienai integral derivative (PID) are adopted according to different stages and expected performance of wind turbine to capture optimum wind power, compensate the nonlinearity and improve the wind turbine performance at low, rated and high wind speed.

  18. A 34 MW, 120 MJ pulsed dc supply for the UK tokamak reactor ''DITE''

    International Nuclear Information System (INIS)

    Fry, M.G.J.

    1978-01-01

    A static rectifier set supplying as much as 120 MJ of energy at a peak power of 34 MW to the toroidal magnet coils in the DITE experiment is described in detail. The power supply is designed to meet the stringent requirements concerning the maximum admissible peak reactive power. The rectifier is divided into two series-connected sections, one with diode bridges providing a fixed voltage, the other with thyristors which may work in either the rectifier or line-commutated inverter mode. The rectifier transformers are preceded by mechanical line-voltage regulators of the patented ''Interstep'' types, which comprise dual-voltage 11/33 kV tapped autotransformers and tap selection switches. Four parallel-connected thyristor bridges are used, perfect current sharing being assured by independent control of firing circuits. The firing circuits consist of non-conventional pulse generators and pulse amplifiers. Trains of precisely timed firing pulses are produced by using the phase-lock loop technique and the TTL logic. An extremely high noise immunity is achieved. (J.U.)

  19. Performance evaluation of 10 MW grid connected solar photovoltaic power plant in India

    Directory of Open Access Journals (Sweden)

    B. Shiva Kumar

    2015-11-01

    Full Text Available The growing energy demand in developing nations has triggered the issue of energy security. This has made essential to utilize the untapped potential of renewable resources. Grid connected PV systems have become the best alternatives in renewable energy at large scale. Performance analysis of these grid connected plants could help in designing, operating and maintenance of new grid connected systems. A 10 MW photovoltaic grid connected power plant commissioned at Ramagundam is one of the largest solar power plants with the site receiving a good average solar radiation of 4.97 kW h/m2/day and annual average temperature of about 27.3 degrees centigrade. The plant is designed to operate with a seasonal tilt. In this study the solar PV plant design aspects along with its annual performance is elaborated. The various types of power losses (temperature, internal network, power electronics, grid connected etc. and performance ratio are also calculated. The performance results of the plant are also compared with the simulation values obtained from PV syst and PV-GIS software. The final yield (Y F of plant ranged from 1.96 to 5.07 h/d, and annual performance ratio (PR of 86.12%. It has 17.68% CUF with annual energy generation of 15798.192 MW h/Annum.

  20. Structural degradation of Thar lignite using MW1 fungal isolate: optimization studies

    Science.gov (United States)

    Haider, Rizwan; Ghauri, Muhammad A.; Jones, Elizabeth J.; Orem, William H.; SanFilipo, John R.

    2015-01-01

    Biological degradation of low-rank coals, particularly degradation mediated by fungi, can play an important role in helping us to utilize neglected lignite resources for both fuel and non-fuel applications. Fungal degradation of low-rank coals has already been investigated for the extraction of soil-conditioning agents and the substrates, which could be subjected to subsequent processing for the generation of alternative fuel options, like methane. However, to achieve an efficient degradation process, the fungal isolates must originate from an appropriate coal environment and the degradation process must be optimized. With this in mind, a representative sample from the Thar coalfield (the largest lignite resource of Pakistan) was treated with a fungal strain, MW1, which was previously isolated from a drilled core coal sample. The treatment caused the liberation of organic fractions from the structural matrix of coal. Fungal degradation was optimized, and it showed significant release of organics, with 0.1% glucose concentration and 1% coal loading ratio after an incubation time of 7 days. Analytical investigations revealed the release of complex organic moieties, pertaining to polyaromatic hydrocarbons, and it also helped in predicting structural units present within structure of coal. Such isolates, with enhanced degradation capabilities, can definitely help in exploiting the chemical-feedstock-status of coal.

  1. Operation experience with the 3 MW TRIGA Mark-II research reactor of Bangladesh

    International Nuclear Information System (INIS)

    Islam, M.S.; Haque, M.M.; Salam, M.A.; Rahman, M.M.; Khandokar, M.R.I.; Sardar, M.A.; Saha, P.K.; Haque, A.; Malek Sonar, M.A.; Uddin, M.M.; Hossain, S.M.S.; Zulquarnain, M.A.

    2004-01-01

    The 3 MW TRIGA Mark-II research reactor of Bangladesh Atomic Energy Commission (BAEC) has been operating since September 14, 1986. The reactor is used for radioisotope production ( 131 I, 99m Tc, 46 Sc), various R and D activities and manpower training. The reactor has been operated successfully since it's commissioning with the exception of a few reportable incidents. Of these, the decay tank leakage incident of 1997 is considered to be the most significant one. As a result of this incident, reactor operation at full power under forced-convection mode remained suspended for about 4 years. During that time, the reactor was operated at a power level of 250 kW so as to carry out experiments that require lower neutron flux. This was made possible by establishing a temporary by pass connection across the decay tank using local technology. The other incident was the contamination of the Dry Central Thimble (DCT) that took place in March 2002 when a pyrex vial containing 50 g of TeO 2 powder got melted inside the DCT. The vial was melted due to high heat generation on its surface while the reactor was operated for 8 hours at 3 MW for trial production of Iodine-131 ( 131 I). A Wet Central Thimble (WCT) was used to replace the damaged DCT in June 2002 such that the reactor operation could be resumed. The WCT was again replaced by a new DCT in June 2003 such that radioisotope production could be continued. A total of 873 irradiation requests (IRs) have been catered for different reactor uses. Out of these, 114 IRs were for radioisotope (RI) production and 759 IRs for different experiments. The total amount of RI produced stands at about 2100 GBq. The total amount of burn-up-fuel is about 6158 MWh. Efforts are on to undertake an ADP project so as to convert the analog console and I and C system of the reactor into digital one. The paper summarizes the reactor operation experiences focusing on troubleshooting, rectification, modification, RI production, various R and D

  2. Accelerations from the September 5, 2012 (Mw=7.6) Nicoya, Costa Rica Earthquake

    Science.gov (United States)

    Simila, G. W.; Quintero, R.; Burgoa, B.; Mohammadebrahim, E.; Segura, J.

    2013-05-01

    Since 1984, the Seismic Network of the Volcanological and Seismological Observatory of Costa Rica, Universidad Nacional (OVSICORI-UNA) has been recording and registering the seismicity in Costa Rica. Before September 2012, the earthquakes registered by this seismic network in northwestern Costa Rica were moderate to small, except the Cóbano earthquake of March 25, 1990, 13:23, Mw 7.3, lat. 9.648, long. 84.913, depth 20 km; a subduction quake at the entrance of the Gulf of Nicoya and generated peak intensities in the range of MM = VIII near the epicentral area and VI-VII in the Central Valley of Costa Rica. Six years before the installation of the seismic network, OVSICORI-UNA registered two subduction earthquakes in northwestern Costa Rica, specifically on August 23, 1978, at 00:38:32 and 00:50:29 with magnitudes Mw 7.0 (HRVD), Ms 7.0 (ISC) and depths of 58 and 69 km, respectively (EHB Bulletin). On September 5, 2012, at 14:42:02.8 UTC, the seismic network OVSICORI-UNA registered another large subduction earthquake in Nicoya peninsula, northwestern Costa Rica, located 29 km south of Samara, with a depth of 21 km and magnitude Mw 7.6, lat. 9.6392, long. 85.6167. This earthquake was caused by the subduction of the Cocos plate under the Caribbean plate in northwestern Costa Rica. This earthquake was felt throughout the country and also in much of Nicaragua. The instrumental intensity map for the Nicoya earthquake indicates that the earthquake was felt with an intensity of VII-VIII in the Puntarenas and Nicoya Peninsulas, in an area between Liberia, Cañas, Puntarenas, Cabo Blanco, Carrillo, Garza, Sardinal, and Tamarindo in Guanacaste; Nicoya city being the place where the maximum reported intensity of VIII is most notable. An intensity of VIII indicates that damage estimates are moderate to severe, and intensity VII indicates that damage estimates are moderate. According to the National Emergency Commission of Costa Rica, 371 affected communities were reported; most

  3. Structural design study of a proton beam window for a 1-MW spallation neutron source

    Energy Technology Data Exchange (ETDEWEB)

    Teraoku, Takuji; Terada, Atsuhiko; Maekawa, Fujio; Meigo, Shin-ichiro; Kaminaga, Masanori; Ishikura, Syuichi; Hino, Ryutaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2003-03-01

    A 1-MW spallation neutron source aiming at materials and life science researches will be constructed under the JAERI-KEK High-intensity Proton Accelerator Project (J-PARC). A proton beam passes through a proton beam window, and be injected into a target of the neutron source. The proton beam window functions as a boundary wall between a high vacuum area in the proton beam line and a helium atmosphere at about atmospheric pressure in a helium vessel which contains the target and moderators. The proton beam window is cooled by light water because high heat-density is generated in the window material by interactions with the proton beam. Then, uniformity of the water flow is requested at the window to suppress a hot-spot that causes excessive thermal stress and cooling water boiling. Also, the window has to be strong enough in its structure for inner stress due to water pressure and thermal stress due to heat generation. In this report, we propose two types of proton beam windows; one flat-type that is easy to manufacture, and the other, curved-type that has high stress resistivity. As a part of design study for the windows, evaluation of strength of structure and thermal hydraulic analysis were conducted. As a result, it was found that sufficient heat removal was assured with uniform water flow at the window, and stress caused by internal water pressure and thermal stress could be maintained below allowable stress values. Accordingly, it was confirmed that the proton beam window designs were feasible. (author)

  4. Energy and exergy evaluation of a 220MW thermal power plant ...

    African Journals Online (AJOL)

    Energy and exergy evaluation of a 220MW thermal power plant. ... Nigerian Journal of Technology ... At the variation of environmental or dead state temperature, ther e were no appreciable changes in the values of exergy efficiency of the ...

  5. 2000 MW(t) HTGR-DC-GT Modesto Site dry cooled model 346 concice

    International Nuclear Information System (INIS)

    1979-07-01

    Construction information is presented for a 800 MW(e) HTGR power reactor. The information is itemized for each reactor component or system and incudes quantity, labor hours, labor cost, material cost, and total costs

  6. The heating operational summarization in three winters of a 5 MW test heating reactor

    International Nuclear Information System (INIS)

    Wang Dazhong; Dong Duo; Su Qingshan; Zhang Yajun

    1992-09-01

    The 5 MW THR (5 MW test heating reactor) is a new type reactor with inherent safety developed by INET (Institute of Nuclear Energy Technology). It is the first 'pressure vessel type' heating reactor in operation in the world. It was put into operation in November, 1989. Since then it has operated for three winter seasons. The total operation time has reached to 8174 hours and its availability of heating has reached to 99%. The advanced technology of this reactor has been proved in the past three years operation. The characteristics of power regulating, load following, reactivity disturbance and the variation of parameters under the condition of ATWS (anticipated transients without scram) were studied with experiments in 5 MW THR. The 5 MW THR is an ideal heating reactor and has outstanding performances

  7. Reactor control and protection of full scope simulator for Qinshan 300 MW Nuclear Power Unit

    International Nuclear Information System (INIS)

    Zhu Jinping; Sun Jiliang

    1996-01-01

    The control and protection simulation of Qinshan 300 MW Nuclear Power Unit, including the nuclear control, the pressurizer pressure control, the pressurizer level control, the rod control, the reactor shutdown protection and engineered safety feature etc are briefly introduced

  8. Economic and Environmental Assessment of a 1 MW Grid Connected Rooftop Solar PV System for Energy Efficient Building in Bangladesh

    Science.gov (United States)

    Chakraborty, Sanjib; Hosain, Rubayet; Rahman, Toufiqur; Rabbi, Ahmead Fazle

    This paper evaluates the potentiality of a 1 MW grid connected rooftop solar PV system for an Energy Efficient Building in Bangladesh, which was estimated by utilizing NASA SSE solar radiation data, PVsyst simulation software and RETScreen simulation software. Economic and environmental viability for a ten-storied building with roof area of 6,500 m2 in the Capital City of Bangladesh, Dhaka was assessed by using the RETScreen simulation software. The yearly electricity production of the proposed system was 1,581 MWh estimated by PVsyst where the technical prospective of gird-connected solar PV in Bangladesh was calculated as about 50,174 MW. The economic assessments were determined the simple payback in such a way that the generated electricity first fulfills the demand of the building, and then the rest of the energy is supplied to the grid. The result indicates that the roof top solar PV system for an Energy efficient building in Dhaka city has a favorable condition for development both in economic and environmental point of view.

  9. Development of helium transfer coupling of 1 MW-class HTS motor for podded ship propulsion system

    Energy Technology Data Exchange (ETDEWEB)

    Kosuge, Eiji; Gocho, Yoshitsugu; Okumura, Kagao; Yamaguchi, Mitsugi [JapaneseSuperconductivity Organization, 135-8533, Tokyo (Japan); Umemoto, Katsuya; Aizawa, Kiyoshi; Yokoyama, Minoru; Takao, Satoru, E-mail: gocho@jso--new-scm.co.j [Kawasaki Heavy Industries LTD., 673-8666, Hyogo (Japan)

    2010-06-01

    Research and development of 1 MW superconducting motor are being made aiming at the efficiency improvement for the podded type ship propulsion. The basic machine configuration is similar to steam turbine generators, having a rotating horizontal shaft. As for the motor composed of rotating superconducting field, one of the most critical issues is to provide a technically viable helium transfer coupling (HTC). The field winding of 1 MW motor is cooled with cryogenic helium gas. The HTC needs to supply the cryogenic helium gas with an appropriate flow rate from the stationary part to the rotating field winding region through a hollowed shaft in order not to lose superconducting state of the winding. A full size prototype of HTC was developed prior to the actual one to demonstrate its technical acceptability. The fundamental data with regard to the supply of the refrigerated helium gas were successfully obtained at the rated speed. This work has been supported by New Energy, and Industrial Technology Development Organization (NEDO).

  10. RELAP5-3D Results for Phase I (Exercise 2) of the OECD/NEA MHTGR-350 MW Benchmark

    Energy Technology Data Exchange (ETDEWEB)

    Gerhard Strydom

    2012-06-01

    The coupling of the PHISICS code suite to the thermal hydraulics system code RELAP5-3D has recently been initiated at the Idaho National Laboratory (INL) to provide a fully coupled prismatic Very High Temperature Reactor (VHTR) system modeling capability as part of the NGNP methods development program. The PHISICS code consists of three modules: INSTANT (performing 3D nodal transport core calculations), MRTAU (depletion and decay heat generation) and a perturbation/mixer module. As part of the verification and validation activities, steady state results have been obtained for Exercise 2 of Phase I of the newly-defined OECD/NEA MHTGR-350 MW Benchmark. This exercise requires participants to calculate a steady-state solution for an End of Equilibrium Cycle 350 MW Modular High Temperature Reactor (MHTGR), using the provided geometry, material, and coolant bypass flow description. The paper provides an overview of the MHTGR Benchmark and presents typical steady state results (e.g. solid and gas temperatures, thermal conductivities) for Phase I Exercise 2. Preliminary results are also provided for the early test phase of Exercise 3 using a two-group cross-section library and the Relap5-3D model developed for Exercise 2.

  11. Preliminary design studies for a 100 MW Energy Amplifier prototype

    CERN Document Server

    Abánades, A

    2000-01-01

    The Energy Amplifier (EA) is a new concept of fission system based on a subcritical assembly sustained with the neutrons generated by proton beam impact on a heavy element (spallation). This concept, proposed by the Nobel Laureate C. Rubbia (Rubbia, 1995), has remarkable capabilities in the nuclear energy field. First, it can be used to transmute radioactive wastes with a high efficiency alleviating the requirements of the geological repositories, and, second, it provides a massive energy source with the intrinsic safety derived from the use of a subcritical system and an almost null production of long-lived radioactive wastes. EA concept principles have been successfully tested by two experiments at CERN: FEAT (Andriamonge, 1995), that proved there is a net energy gain, by comparing the energy needed by the accelerator with the generated one by fission in the subcritical system. The second experiment, TARC (Abanades, 1997; Arnould, 1999) demonstrated the capability to transmute radioactive elements. The next...

  12. Investigation of in service inspection for pressure vessel of the 200 MW nuclear heating reactor

    International Nuclear Information System (INIS)

    He Shuyan; Yin Ming; Liu Junjie; Chang Huanjian; Zhou Ningning

    1997-01-01

    The Nuclear District Heating Reactor (NHR) is a new type of reactor. There are some differences in the arrangement of the primary circuit components and in safety features between NHR and PWR or other reactors. In this paper the safety features of the 200 MW NHR are described. The failure probability, the LBB property and the in-service inspection requirement for the 200 MW NHR pressure vessel are also discussed. (author). 16 refs, 6 figs, 4 tabs

  13. Development of over-1 MW gyrotrons for the LHD and the GAMMA 10 ECH systems

    International Nuclear Information System (INIS)

    Imai, T.; Kariya, T.; Minami, R.

    2010-11-01

    For the ECH upgrade program of LHD and GAMMA10, over-1 MW power gyrotrons have been developed in the joint program of NIFS and University of Tsukuba. The gyrotrons for LHD and GAMMA 10 have TE 18,6 cavity and a diamond window at 77 GHz, and with TE 8,3 cavity at 28 GHz, respectively. The maximum outputs obtained are 1.9 MW for 0.1 s on the 77 GHz LHD tube and ∼ 1 MW on the 28 GHz one, which are the new records in these frequency ranges. The results of 1.8 MW for 1 s, 1.6 MW for 1.8s, 1 MW for 5 s, 300 kW for 40 min and 200 kW for 75 min were achieved at 77 GHz. In the long pulse operation, it is found that the stray RF is the major cause limiting the pulse length. Design improvements of the diffraction loss, the cavity and pitch factor α (=v sub(perpendicular)/v sub(parallel)) dispersion of the MIG have made the 77 GHz tube performance better, which have enabled to demonstrate 1.9 MW output and long pulse operation for more than 1 hour with 200 kW. The three 77 GHz gyrotrons have already been installed in the LHD ECH system and more than 3 MW has been injected into LHD plasma. In the 28 GHz long pulse operation, 400 kW for 1 sec has been obtained and it is found the higher and longer pulse operation would be possible with the operation optimization and conditioning. (author)

  14. Development of a 5 MW reference gearbox for offshore wind turbines

    OpenAIRE

    Rasekhi Nejad, Amir; Guo, Yi; Gao, Zhen; Moan, Torgeir

    2016-01-01

    This paper presents detailed descriptions, modeling parameters and technical data of a 5MW high-speed gearbox developed for the National Renewable Energy Laboratory offshore 5MW baseline wind turbine. The main aim of this paper is to support the concept studies and research for large offshore wind turbines by providing a baseline gearbox model with detailed modeling parameters. This baseline gearbox follows the most conventional design types of those used in wind turbines. It is based on the ...

  15. Design of a tunable 4-MW Free Electron Maser for heating fusion plasmas

    International Nuclear Information System (INIS)

    Caplan, M.; Kamin, G.; Shang, C.C.; Lindquist, W.

    1993-09-01

    There is an ongoing program at the FOM institute, The Netherlands, to develop a 1-MW, long-pulse, 200-Ghz Free Electron Maser (FEM) using a DC accelerator system with depressed collector. We present an extrapolation of this design to more than 4MW of output microwave power in order to reduce the cost per kW and increase the power per module in a plasma heating system

  16. Design of a tunable 4-MW free electron maser for heating fusion plasmas

    International Nuclear Information System (INIS)

    Caplan, M.; Kamin, G.; Shang, C.C.; Lindquist, W.

    1993-01-01

    There is an ongoing program at the FOM institute, The Netherlands, to develop a 1 -MW, long-pulse, 200-GHz Free Electron Maser (FEM) using a DC accelerator system with depressed collector. The authors present an extrapolation of this design to more than 4 MW of output microwave power in order to reduce the cost per kW and increase the power per module in a plasma heating system

  17. The moment magnitude Mw and the energy magnitude Me: common roots and differences

    OpenAIRE

    2010-01-01

    Abstract Starting from the classical empirical magnitude-energy relationships, in this article, the derivation of the modern scales for moment magnitude Mw and energy magnitude Me is outlined and critically discussed. The formulas for Mw and Me calculation are presented in a way that reveals, besides the contributions of the physically defined measurement parameters seismic moment M0 and radiated seismic energy ES, the role of the constants in the classical Gutenberg?Richter magnit...

  18. EURISOL-DS MULTI-MW TARGET ISSUES: BEAM WINDOW AND TRANSVERSE FILM TARGET

    CERN Document Server

    Adonai Herrera-Martínez, Yacine Kadi

    The analysis of the EURISOL-DS Multi_MW target precise geometry (Fig.1) has proved that large fission yields can be achieved with a 4 MW, providing a technically feasible design to evacuate the power deposited in the liquid mercury. Different designs for the mercury flow have been proposed, which maintain its temperature below the boiling point with moderate flow speeds (maximum 4 m/s).

  19. Multi-MW target station: Beam Window Issues and Transverse Film Target

    CERN Document Server

    Herrera-Martinez, A

    The analysis of the EURISOL-DS Multi_MW target precise geometry has proved that large fission yields can be achieved with a 4 MW, providing a technically feasible design to evacuate the power deposited in the liquid mercury. Different designs for the mercury flow have been proposed, which maintain its temperature below the boiling point with moderate flow speeds (maximum 4 m/s).

  20. Investigation of in service inspection for pressure vessel of the 200 MW nuclear heating reactor

    Energy Technology Data Exchange (ETDEWEB)

    Shuyan, He; Ming, Yin; Junjie, Liu; Huanjian, Chang; Ningning, Zhou [Institute of Nuclear Energy and Technology, Tsingua Univ., Beijing (China)

    1997-09-01

    The Nuclear District Heating Reactor (NHR) is a new type of reactor. There are some differences in the arrangement of the primary circuit components and in safety features between NHR and PWR or other reactors. In this paper the safety features of the 200 MW NHR are described. The failure probability, the LBB property and the in-service inspection requirement for the 200 MW NHR pressure vessel are also discussed. (author). 16 refs, 6 figs, 4 tabs.

  1. Operation of a 1.3 GHz, 10 MW Multiple Beam Klystron

    CERN Document Server

    Bohlen, H P; Cattelino, M; Cox, L; Cusick, M; Forrest, S; Friedlander, F; Staprans, A; Wright, E; Zitelli, L

    2004-01-01

    Results will be reported for a 1.3 GHz, 10 MW multiple beam klystron that is being developed for the TESLA linear accelerator facility. The design parameters for the device are 10 MW peak RF output power with 150 kW average power, 1.5 ms pulse length, 65% efficiency, 50 dB gain, and 2.0 A/cm2

  2. Neutron generator based on adiabatic trap

    International Nuclear Information System (INIS)

    Golovin, I.N.; Zhil'tsov, V.A.; Panov, D.A.; Skovoroda, A.A.; Shatalov, G.E.; Shcherbakov, A.G.

    1988-01-01

    A possibility of 14 MeV neutron generator (NG) production on the basis of axial-symmetric adiabatic trap with MHD cusped armature for the testing of materials and elements of the DT reactor first wall and blanket structure is discussed. General requirements to NG are formulated. It is shown that the NG variant discussed meets the requirements formulated. Approximate calculation of the NG parameters has shown that total energy consumption by the generator does not exceed 220 MW at neutron flux specific capacity of 2.5 MW/m 2 and radiation test area of 5-6 m 2

  3. The removal of VOC from air using EB, MW and catalyst - Laboratory plant results

    International Nuclear Information System (INIS)

    Calinescu, I.; Ighigeanu, D.; Martin, D.

    2011-01-01

    A new hybrid technique for the VOCs removal from gases, based on the combined use of EB induced NTP (non-thermal plasma), MW induced NTP and catalytic oxidation, named “EB+MW-plasma catalysis”, is presented. The main goal of our research was to combine the features of each known technique used in gas pollution control, i.e. the very high efficiency of EB in converting VOCs to intermediate products, the ability of MW to produce and sustain NTP in large electrodeless reactors, and the important role of catalysts in the complete conversion to CO 2 and H 2 O. Our experiences shown that the two means of treating the gases are complementary: the catalytic oxidation in the presence of MW is efficient for high VOC initial concentrations and low flow rates while the exclusive use of the EB irradiation determines high decomposition efficiencies only in the case of very low concentrations of VOC but for large flow rates. Real synergistic effects between NTP and catalysis were obtained by introducing the catalyst into the irradiation zone. The main conclusion of this work is that the combined treatment EB+MW+catalyst improves both decomposition efficiency and oxidation efficiency. The EB+MW+Catalysis method demonstrated good results on a wide range of concentrations and flow rates. (author)

  4. The removal of VOC from air using EB, MW and catalyst - Laboratory plant results

    Energy Technology Data Exchange (ETDEWEB)

    Calinescu, I. [Polytechnic University, Bucharest (Romania); Ighigeanu, D.; Martin, D. [National Institute for Lasers, Plasma and Radiation Physics, Bucharest (Romania)

    2011-07-01

    A new hybrid technique for the VOCs removal from gases, based on the combined use of EB induced NTP (non-thermal plasma), MW induced NTP and catalytic oxidation, named “EB+MW-plasma catalysis”, is presented. The main goal of our research was to combine the features of each known technique used in gas pollution control, i.e. the very high efficiency of EB in converting VOCs to intermediate products, the ability of MW to produce and sustain NTP in large electrodeless reactors, and the important role of catalysts in the complete conversion to CO{sub 2} and H{sub 2}O. Our experiences shown that the two means of treating the gases are complementary: the catalytic oxidation in the presence of MW is efficient for high VOC initial concentrations and low flow rates while the exclusive use of the EB irradiation determines high decomposition efficiencies only in the case of very low concentrations of VOC but for large flow rates. Real synergistic effects between NTP and catalysis were obtained by introducing the catalyst into the irradiation zone. The main conclusion of this work is that the combined treatment EB+MW+catalyst improves both decomposition efficiency and oxidation efficiency. The EB+MW+Catalysis method demonstrated good results on a wide range of concentrations and flow rates. (author)

  5. Performance Analysis of 14 MW Grid-Connected Photovoltaic System

    International Nuclear Information System (INIS)

    Kagilik, Ahmed S.; Tawel, Abduraouf M.

    2015-01-01

    Many Libyan authorities proposed to investigate the possibility of utilizing a suitable terrain in Libya to add generation capacity of large-scale photovoltaic power plants. In this paper, the first grid-connected PV plant of 14 MWp which will be executed in Hoon city and supported by the Renewable Energy Authority of Libya (REAOL) is presented. To understand and improve the operational behavior of PV system, a comprehensive study including the plant design and detailed performance analysis under a local climate conditions is performed. Using polycrystalline silicon technology, the first year energy yield is estimated and the monthly system output for this plant is calculated. The performance ratio and various power losses (temperature, irradiance, power electronics, interconnection, etc.) are determined. The PV system supplied 24964 MWh to the grid during the first year giving an average annual overall yield factor 1783 kWh/kWp and average annual performance ratio of the system of 76.9%.(author)

  6. Development of over 1 MW and multi-frequency gyrotrons for fusion

    International Nuclear Information System (INIS)

    Imai, T.; Kariya, T.; Minami, R.; Numakura, T.; Kato, T.; Endo, Y.; Ichimura, M.; Eguchi, T.; Mitsunaka, Y.; Shimozuma, T.; Kubo, S.; Takahashi, H.; Yoshimura, Y.; Igami, H.; Ito, S.; Mutoh, T.; Sakamoto, Keishi; Idei, H.; Zushi, H.; Nagasaki, K.; Sano, F.; Ono, M.

    2014-10-01

    The development of wide frequency range from 14 to 300 GHz of high power mega-watt gyrotron for fusion is in progress in University of Tsukuba. The strong development activity was carried out in collaboration with JAEA, NIFS, TETD and universities. Over-1 MW dual frequency gyrotron of new frequency range (14 – 35 GHz), where the reduction of diffraction loss and cathode optimization are quite important, has been developed for EC/EBW H and CD for GAMMA 10/PDX, QUEST, Heliotron J and NSTX-U. Output power of 1.25 MW at 28 GHz and estimated oscillation power of 1.2 MW at 35.45 GHz from the same tube have been achieved with the cathode angle improvement and two frequency window. This is the first demonstration of the over 1 MW dual-frequency operations in lower frequency, which contributes to the technology of wide band multi-frequency/multi-MW tube. The output power of 600 kW for 2 s at 28 GHz is also demonstrated. It is applied to the QUEST and has resulted higher EC-driven current than ever. As for higher frequency range, in the joint program of NIFS and Tsukuba for LHD ECH gyrotrons, a new frequency of 154 GHz has been successfully developed with a TE 28,8 cavity, which delivered 1.16 MW for 1 s and the total power of 4.4 MW to LHD plasma with other three 77 GHz tubes, which extended the LHD plasma to high T e region. All these gyrotron performances are new records in each frequency range. The sub-THz gyrotron development is also just begun in collaboration with JAEA for Demo-Reactor ECH system. (author)

  7. Neutronic analysis for the fission Mo99 production by irradiation of leu targets in TRIGA 14 MW reactor

    International Nuclear Information System (INIS)

    Dulugeac, S. D.; Mladin, M.; Budriman, A. G.

    2013-01-01

    Molybdenum production can be a solution for the future in the utilization of the Romanian TRIGA, taking into account the international market supply needs. Generally, two different techniques are available for Mo 99 production for use in medical Tc 99 generation.The first one is based on neutron irradiation of molybdenum targets of natural isotopic composition or enriched in Mo 98 . In a second process, Mo 99 is obtained as a result of the neutron induced fission of U 235 according to U 235 (n,f) Mo 99 . The objectives of the paper are related to Mo 99 production as a result of fission. Neutron physics parameters are determined and presented, such as: thermal flux axial distribution for the critical reactor at 10 MW inside the irradiation location; reactivity introduced by three Uranium foil containers; neutron fluxes and fission rates in the Uranium foils; released and deposited power in the Uranium foils; Mo 99 activity in the Uranium foils. (authors)

  8. Analysis of mechanical characteristics of superconducting field coil for 17 MW class high temperature superconducting synchronous motor

    International Nuclear Information System (INIS)

    Kim, J. H.; Park, S. I.; Im, S. H.; Kim, H. M.

    2013-01-01

    Superconducting field coils using a high-temperature superconducting (HTS) wires with high current density generate high magnetic field of 2 to 5 [T] and electromagnetic force (Lorentz force) acting on the superconducting field coils also become a very strong from the point of view of a mechanical characteristics. Because mechanical stress caused by these powerful electromagnetic force is one of the factors which worsens the critical current performance and structural characteristics of HTS wire, the mechanical stress analysis should be performed when designing the superconducting field coils. In this paper, as part of structural design of superconducting field coils for 17 MW class superconducting ship propulsion motor, mechanical stress acting on the superconducting field coils was analyzed and structural safety was also determined by the coupling analysis system that is consists of commercial electromagnetic field analysis program and structural analysis program.

  9. High Frequency Infrasonic Radiation from the 11 March 2011 Tohoku Mw 9.0 Earthquake

    Science.gov (United States)

    Walker, K. T.; Le Pichon, A.; Degroot-Hedlin, C. D.; Che, I.

    2011-12-01

    The tragic March 11 Mw 9.0 Tohoku earthquake ruptured the Wadati-Benioff zone beneath northeast Japan, generating a damaging seismic wavetrain and triggering a tsunami that devastated the nearby coastal areas. Centroid moment tensors, aftershocks, and the geometry of the trench suggest the rupture occurred on a plane roughly 400 km long by 200 km wide. Because the Earth's surface is effectively a speaker, the seismic wavetrain generated infrasonic emissions from northeast Japan that were recorded by seven infrasound arrays within 5600 km of the epicenter. Using a time progressive beamforming method and the Progressive Multi-Channel Correlation method, we detect and calculate back azimuths for the 0.3 to 3 Hz infrasonic signals at these stations. After application of predicted wind corrections, these back azimuths point to Honshu and Hokkaido, with the majority of detections illuminating a north-south elongated area near Sendai, where the USGS ShakeMap predicts the greatest intensity of surface shaking. An array near Tokyo (IS30) provides the first recording of locally generated infrasound from a very large dip-slip earthquake. At IS30 a six-minute arrival in the 0.3 to 1.5 Hz band is observed from northeast Japan spanning an 18° back azimuth range. Two shorter events originate from a source to the west, likely Mt. Fuji. Using constraints from propagation modeling, we back project the infrasonic amplitudes recorded at IS30 to a relatively localized area. The maximum amplitude of 1 Pa originates from surface shaking along the coast. This location is also just west of the epicenter and adjacent to the location of maximum P-wave radiation from back projection studies. Noise at IS30 after the mainshock limits the detection of additional signals. A more pronounced infrasonic wavetrain at IS44 (Kamchatka) illuminates the entire Honshu and Hokkaido region, especially along the east coast near Sendai. In agreement with propagation modeling predictions using global

  10. Seismic displacements monitoring for 2015 Mw 7.8 Nepal earthquake with GNSS data

    Science.gov (United States)

    Geng, T.; Su, X.; Xie, X.

    2017-12-01

    The high-rate Global Positioning Satellite System (GNSS) has been recognized as one of the powerful tools for monitoring ground motions generated by seismic events. The high-rate GPS and BDS data collected during the 2015 Mw 7.8 Nepal earthquake have been analyzed using two methods, that are the variometric approach and Precise point positioning (PPP). The variometric approach is based on time differenced technique using only GNSS broadcast products to estimate velocity time series from tracking observations in real time, followed by an integration procedure on the velocities to derive the seismic event induced displacements. PPP is a positioning method to calculate precise positions at centimeter- or even millimeter-level accuracy with a single GNSS receiver using precise satellite orbit and clock products. The displacement motions with accuracy of 2 cm at far-field stations and 5 cm at near-field stations with great ground motions and static offsets up to 1-2 m could be achieved. The multi-GNSS, GPS + BDS, could provide higher accuracy displacements with the increasing of satellite numbers and the improvement of the Position Dilution of Precision (PDOP) values. Considering the time consumption of clock estimates and the precision of PPP solutions, 5 s GNSS satellite clock interval is suggested. In addition, the GNSS-derived displacements are in good agreement with those from strong motion data. These studies demonstrate the feasibility of real-time capturing seismic waves with multi-GNSS observations, which is of great promise for the purpose of earthquake early warning and rapid hazard assessment.

  11. Power generation in South Africa

    International Nuclear Information System (INIS)

    Van der Walt, N.T.

    1976-01-01

    There have been extensive developments in the power supply industry in South Africa. The most evident of these has been the increase in the size of generating units. Escom has recently placed orders for 600 MW units. In South Africa, with its large indigenous reserves of cheap coal, there was no need to rush into a nuclear power programme before it would be economic and, accordingly the first serious study of nuclear power generation was not undertaken until 1966. A final aspect of power generation which is becoming very important is the control of pollution and protection of the environment

  12. Demonstration of Essential Reliability Services by a 300-MW Solar Photovoltaic Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Loutan, Clyde; Klauer, Peter; Chowdhury, Sirajul; Hall, Stephen; Morjaria, Mahesh; Chadliev, Vladimir; Milam, Nick; Milan, Christopher; Gevorgian, Vahan

    2017-03-24

    The California Independent System Operator (CAISO), First Solar, and the National Renewable Energy Laboratory (NREL) conducted a demonstration project on a large utility-scale photovoltaic (PV) power plant in California to test its ability to provide essential ancillary services to the electric grid. With increasing shares of solar- and wind-generated energy on the electric grid, traditional generation resources equipped with automatic governor control (AGC) and automatic voltage regulation controls -- specifically, fossil thermal -- are being displaced. The deployment of utility-scale, grid-friendly PV power plants that incorporate advanced capabilities to support grid stability and reliability is essential for the large-scale integration of PV generation into the electric power grid, among other technical requirements. A typical PV power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. In this way, PV power plants can be used to mitigate the impact of variability on the grid, a role typically reserved for conventional generators. In August 2016, testing was completed on First Solar's 300-MW PV power plant, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to use grid-friendly controls to provide essential reliability services. These data showed how the development of advanced power controls can enable PV to become a provider of a wide range of grid services, including spinning reserves, load following, voltage support, ramping, frequency response, variability smoothing, and frequency regulation to power quality. Specifically, the tests conducted included various forms of active power control such as AGC and frequency regulation; droop response; and reactive power, voltage, and power factor controls. This project demonstrated that advanced power electronics and solar generation can be

  13. Introduction guide book for wind power generation; Furyoku hatsuden donyu guide book

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This paper arranges essential items for introduction of wind power generation to local governments. Natural wind power energy which is free from emission of atmospheric pollutants such as CO2 and probably profitable, is leading regenerative energy among several new energies, and its rapid diffusion is expected. At the end of 1995, a wind power generation facility capacity amounts to 4900MW in the world, 1770MW in USA, 1140MW in Germany, 630MW in Denmark, 550MW in India, and 250MW in the Netherlands. In Japan, its introduction to local governments is in progress with preparation of a purchase system of surplus electric power and a system interconnection guideline. A total facility capacity reached 10MW in 1996, and is scheduled to reach 150MW in fiscal 2010. NEDO`s wind characteristic map of Japan shows many promising areas for power generation. Since these information is not yet well known, the following are summarized: the present state, features of wind condition, power generation systems, application cases, an approach to survey research, construction, maintenance and related laws, and a subsidy system. 31 refs., 48 figs., 40 tabs.

  14. Turbines, generators and associated plant incorporating modern power system practice

    CERN Document Server

    Littler, DJ

    1992-01-01

    The introduction of new 500 MW and 660 MW turbine generator plant in nuclear, coal- and oil-fired power stations has been partly responsible for the increase in generating capacity of the CEGB over the last 30 years. This volume provides a detailed account of experience gained in the development, design, manufacture, operation and testing of large turbine-generators in the last 20 years. With the advance in analytical and computational techniques, the application of this experience to future design and operation of large turbine-generator plant will be of great value to engineers in the indust

  15. Relaxation on the Ismetpasa segment of the North Anatolian Fault after the Golcuk Mw = 7.4 and Duzce Mw = 7.2 shocks

    Directory of Open Access Journals (Sweden)

    E. Koksal

    2010-12-01

    Full Text Available The Ismetpasa segment of the North Anatolian Fault (NAF is a rare place where aseismic fault slip (creep has been observed. Its creep behaviour has been monitored using different observation methods since the 1950s. The findings obtained from the studies until 1990s showed that the creep rate exponentially decreased before the major shocks in 1999, Golcuk (Mw = 7.4 and Duzce (Mw = 7.2. After these shocks, three GPS periods observation in 2002, 2007 and 2008 were carried out on the geodetic network established around the segment. The evaluations of these observations showed that the creep behaviour relaxed after the major earthquakes. This result demonstrates that the creep behaviour of the Ismetpasa segment might be a warning before future major earthquakes.

  16. Development of MW gyrotrons for fusion devices by University of Tsukuba

    International Nuclear Information System (INIS)

    Minami, R.; Kariya, T.; Imai, T.; Numakura, T.; Endo, Y.; Nakabayashi, H.; Eguchi, T.; Shimozuma, T.; Kubo, S.; Yoshimura, Y.; Igami, H.; Takahashi, H.; Mutoh, T.; Ito, S.; Idei, H.; Zushi, H.; Yamaguchi, Y.; Sakamoto, Keishi; Mitsunaka, Y.

    2012-11-01

    Over-1 MW power gyrotrons for electron cyclotron heating (ECH) have been developed in the joint program of NIFS and University of Tsukuba. The obtained maximum outputs are 1.9 MW for 0.1 s on the 77 GHz Large Helical Device (LHD) tube and 1.0 MW for 1 ms on the 28 GHz GAMMA 10 one, which are new records in these frequency ranges. In long pulse operation, 300 kW for 40 min at 77 GHz and 540 kW for 2 s at 28 GHz were achieved. A new program of 154 GHz 1 MW development has started for high density plasma heating in LHD and the first tube has been fabricated. These lower frequency tubes like 77 GHz or 28 GHz one are also important for advanced magnetic fusion devices, which use Electron Bernstein Wave (EBW) heating / current drive. As a next activity of 28 GHz gyrotron, we have already started the development of over-1.5 MW gyrotron and a new design study of 28 GHz / 35 GHz dual frequency gyrotron, which indicates the practicability of the multi-purpose gyrotron. (author)

  17. Source complexity of the May 20, 2012, Mw 5.9, Ferrara (Italy event

    Directory of Open Access Journals (Sweden)

    Davide Piccinini

    2012-10-01

    Full Text Available A Mw 3.9 foreshock on May 19, 2012, at 23:13 UTC, was followed at 02:03 on May 20, 2012, by a Mw 5.9 earthquake that hit a densely populated area in the Po Plain, west of the city of Ferrara, Italy (Figure 1. Over the subsequent 13 days, six Mw >5 events occurred; of these, the most energetic was a Mw 5.8 earthquake on May 29, 2012, 12 km WSW of the main shock. The tragic balance of this sequence was 17 casualties, hundreds of injured, and severe damage to the historical and cultural heritage of the area. From a seismological point of view, the 2012 earthquake was not an outstanding event in its regional context. The same area was hit in 1996 by a Mw 5.4 earthquake [Selvaggi et al. 2001], and previously in 1986 and in 1967 (DBMI11 [Locati et al. 2011]. The most destructive historical event was the 1570, Imax 8 event, which struck the town of Ferrara [Guidoboni et al. 2007, Rovida et al. 2011]. The 2012 seismic sequence lasted for several weeks and probably developed on a well-known buried thrust fault [Basili et al. 2008, Toscani et al. 2009, DISS Working Group 2010], at depths between 2 km and 10-12 km. […

  18. S-band 45 MW peak power test facility at RRCAT

    International Nuclear Information System (INIS)

    Wanmode, A. Yashwant; Reddy, Sivananda; Mulchandani, J.; Mohania, Praveen; Shrivastava, B. Purushottam

    2015-01-01

    RRCAT is engaged in the design and development of high energy electron LINAC as future injectors for the Booster Synchrotron for Indus-1 and Indus-2 SRS. The high energy LINAC will need microwave power over 30 MW depending on the number of structures to be energized. In order to have advance preparations for this development a 45 MW S-Band test facility has been designed and developed at RRCAT. The test stand is built around a 45 MW peak power S-band pulsed klystron, A conventional pulse forming network based modulator for klystron has been designed and developed. The WR-284 waveguide transmission system consisting of dual directional couplers, SF 6 gas pressurization unit, high power waveguide load and arc sensor has been developed and interfaced with the klystron. The klystron has been successfully tested up to 30 MW peak power at 2856 MHz on SF 6 pressurized waveguide line. A solid state S Band driver amplifier up to 1 kW output power was designed developed for driving the klystron. This paper describes the results of 30 MW peak power test of this facility. (author)

  19. Structural Considerations of a 20MW Multi-Rotor Wind Energy System

    Science.gov (United States)

    Jamieson, P.; Branney, M.

    2014-12-01

    The drive to upscale offshore wind turbines relates especially to possiblereductions in O&M and electrical interconnection costs per MW of installed capacity.Even with best current technologies, designs with rated capacity above about 3 MW are less cost effective exfactory per rated MW(turbine system costs) than smaller machines.Very large offshore wind turbines are thereforejustifiedprimarily by overall offshore project economics. Furthermore, continuing progress in materials and structures has been essential to avoid severe penalties in the power/mass ratio of large multi-MW machines.The multi-rotor concept employs many small rotors to maximise energy capture area withminimum systemvolume. Previous work has indicated that this can enablea very large reduction in the total weight and cost of rotors and drive trains compared to an equivalent large single rotor system.Thus the multi rotor concept may enable rated capacities of 20 MW or more at a single maintenancesite. Establishing the cost benefit of a multi rotor system requires examination of solutions for the support structure and yawing, ensuring aerodynamic losses from rotor interaction are not significant and that overall logistics, with much increased part count (more reliable components) and less consequence of single failuresare favourable. This paper addresses the viability of a support structure in respect of structural concept and likely weight as one necessary step in exploring the potential of the multi rotor concept.

  20. Structural Considerations of a 20MW Multi-Rotor Wind Energy System

    International Nuclear Information System (INIS)

    Jamieson, P; Branney, M

    2014-01-01

    The drive to upscale offshore wind turbines relates especially to possiblereductions in O and M and electrical interconnection costs per MW of installed capacity.Even with best current technologies, designs with rated capacity above about 3 MW are less cost effective exfactory per rated MW(turbine system costs) than smaller machines.Very large offshore wind turbines are thereforejustifiedprimarily by overall offshore project economics. Furthermore, continuing progress in materials and structures has been essential to avoid severe penalties in the power/mass ratio of large multi-MW machines.The multi-rotor concept employs many small rotors to maximise energy capture area withminimum systemvolume. Previous work has indicated that this can enablea very large reduction in the total weight and cost of rotors and drive trains compared to an equivalent large single rotor system.Thus the multi rotor concept may enable rated capacities of 20 MW or more at a single maintenancesite. Establishing the cost benefit of a multi rotor system requires examination of solutions for the support structure and yawing, ensuring aerodynamic losses from rotor interaction are not significant and that overall logistics, with much increased part count (more reliable components) and less consequence of single failuresare favourable. This paper addresses the viability of a support structure in respect of structural concept and likely weight as one necessary step in exploring the potential of the multi rotor concept

  1. Development of a 2 MW CW Waterload for Electron Cyclotron Heating Systems

    Energy Technology Data Exchange (ETDEWEB)

    R. Lawrence,Ives; Maxwell Mizuhara; George Collins; Jeffrey Neilson; Philipp Borchard

    2012-11-09

    Calabazas Creek Research, Inc. developed a load capable of continuously dissipating 2 MW of RF power from gyrotrons. The input uses HE11 corrugated waveguide and a rotating launcher to uniformly disperse the power over the lossy surfaces in the load. This builds on experience with a previous load designed to dissipate 1 MW of continuous RF power. The 2 MW load uses more advanced RF dispersion to double the capability in the same size device as the 1 MW load. The new load reduces reflected power from the load to significantly less than 1 %. This eliminates requirements for a preload to capture reflected power. The program updated control electronics that provides all required interlocks for operation and measurement of peak and average power. The program developed two version of the load. The initial version used primarily anodized aluminum to reduce weight and cost. The second version used copper and stainless steel to meet specifications for the ITER reactor currently under construction in France. Tests of the new load at the Japanese Atomic Energy Agency confirmed operation of the load to a power level of 1 MW, which is the highest power currently available for testing the load. Additional tests will be performed at General Atomics in spring 2013. The U.S. ITER organization will test the copper/stainless steel version of the load in December 2012 or early in 2013. Both loads are currently being marketed worldwide.

  2. Heat wave generates questions about Ontario's generation capacity

    International Nuclear Information System (INIS)

    Horne, D.

    2005-01-01

    Concerns regarding Ontario's power generation capacity were raised following a major blackout which occurred in August 2003. Power demand reached 26,170 MW during the weeks leading to the blackout, forcing the Independent Electricity System Operator (IESO) to ask residents to reduce electricity use during the day. The grid operator had also issued a forecast that Toronto could face rolling blackouts during times of heavy power demand. Ontario power consumption records were set in June and July of 2003 due to a heat wave, with hourly demand exceeding 25,000 MW on 53 occasions. Ontario was forced to import up to 3,400 MW (13 per cent of its power needs) from neighbouring provinces and the United States. During that period, the price of power had risen sharply to over 30 cents a kilowatt hour, although household consumers were still charged in the 5 to 10 cent range per kilowatt hour. However, it was noted that taxpayers will eventually bear the cost of importing power. The IESO noted that importing electricity is cheaper than the generation available in Ontario and that it is more economical to import, based on the market clearing price of all generators. In 2004, the IESO purchased 6 per cent of their electricity from the United States. That figure is expected to increase for 2005. Ontario generators produced 26.9 million MWh more in the summer of 2005 than during the same period in 2004 to meet electricity demand levels. It was noted that although importing power presently meets peak demand, the IESO agrees there is a need for new generation within Ontario. In addition to restarting Ontario's Pickering and Bruce nuclear facilities, more than 3,300 MW of new gas-fired generation is under construction or approved, and more than 9,000 MW are in various stages of approval. This paper discussed the effect of high energy costs on industry and Ontario's ability to meet future electricity demand in comparison to neighbouring jurisdictions. Issues regarding grid maintenance

  3. Proven approaches to emission control at 200 MW power plants

    International Nuclear Information System (INIS)

    Lilja, M.; Moilanen, E.; Bacalum, A.

    1999-01-01

    Due to the tendency fir stricter norms for emission, Eastern European power plants have committed themselves to for low NO x modifications and flu gas desulphurization (FGD) plants for the existing boiler plants. Fortum Engineering has gained experience in low NO x and FGD retrofit projects in Finland, Poland and Czech Republic. The presentation concentrates in two projects: low NO x combustion modifications Jawornzno III Power Plant, Poland and FGD retrofit for Chvaletice Power Station, Czech Republic. The aim of the first contract is to keep NO x emissions of the boilers under 170 mg/MJ after the modification. The project has been successfully completed during the year 1995. Key technology is the application of the newest generation NR-LCC low NO x burners and over firing (OFA) system to the existing boilers with minimum modifications and the auxiliary equipment. As a result during the first half of a year of operation after take-over the NO x emission has been continuously between 120 and 150 mg/MJ and unburned carbon in fly ash has been under 5%. There has been no increased slagging in the furnace. The Chvaltice Power Station burning brown coal had big problems with sulphur oxides in the flue gases. The aim of the project in the station was to reduce SO 2 emissions from 7000 mg/m 3 n. The project has been completed in 1998. Desulphurization in Chvaletice is performed by wet limestone-gypsum method. Flue gases outgoing from electrostatic precipitators are washed in spray absorbers by limestone slurry to remove gaseous sulphur dioxides in flue gases. The process is optimized to achieve the required 94% desulphurization. The aim to decrease SO 2 emissions under 400 mg/m 3 n had been achieved

  4. Calculational criticality analyses of 10- and 20-MW UF6 freezer/sublimer vessels

    International Nuclear Information System (INIS)

    Jordan, W.C.

    1993-02-01

    Calculational criticality analyses have been performed for 10- and 20-MW UF 6 freezer/sublimer vessels. The freezer/sublimers have been analyzed over a range of conditions that encompass normal operation and abnormal conditions. The effects of HF moderation of the UF 6 in each vessel have been considered for uranium enriched between 2 and 5 wt % 235 U. The results indicate that the nuclearly safe enrichments originally established for the operation of a 10-MW freezer/sublimer, based on a hydrogen-to-uranium moderation ratio of 0.33, are acceptable. If strict moderation control can be demonstrated for hydrogen-to-uranium moderation ratios that are less than 0.33, then the enrichment limits for the 10-MW freezer/sublimer may be increased slightly. The calculations performed also allow safe enrichment limits to be established for a 20-NM freezer/sublimer under moderation control

  5. 4 MW upgrade to DIII-D FWCD system: System commissioning and initial operation

    International Nuclear Information System (INIS)

    Cary, W.P.; Callis, R.W.; deGrassie, J.S.; Harris, T.E.; O'Neill, R.C.; Pinsker, R.I.; Baity, F.W.; Barber, G.C.; Ferguson, S.W.

    1995-01-01

    The initial installation of the 4 MW fast wave current drive (FWCD) upgrade started in 1992 with the purchase of two ABB/Thomcast AG rf power amplifiers. These amplifiers cover the frequency range 30 MHz to 120 MHz. A maximum output power of over 2 MW between 30 MHz and 80 MHz and 1 MW at 120 MHz were the specification requirements. The system as installed is comprised of the two mentioned rf amplifiers, coaxial transmission and matching components, rf phase and amplitude monitoring, and a SUN SparcStation 10 control system. Due to various reasons almost every major component in the system required redesign and engineering in order to meet the system requirements. The failures, probable cause and the final redesigns will be discussed as well as some thoughts on how better to specify system requirements for future systems

  6. 4 MW upgrade to DIII-D FWCD system: System commissioning and initial operation

    International Nuclear Information System (INIS)

    Cary, W.P.; Callis, R.W.; Grassie, J.S. de; Harris, T.E.; O'Neill, R.C.; Pinsker, R.I.; Baity, F.W.; Barber, G.C.; Ferguson, S.W.

    1995-10-01

    The initial installation of the 4 MW fast wave current drive (FWCD) upgrade started in 1992 with the purchase of two ABB/Thomcast AG rf power amplifiers. These amplifiers cover the frequency range 30 MHz to 120 MHz. A maximum output power of over 2 MW between 30 MHz and 80 MHz and 1 MW at 120 MHz were the specification requirements. The system as installed is comprised of the two mentioned rf amplifiers, coaxial transmission and matching components, rf phase and amplitude monitoring, and a SUN SparcStation 10 control system. Due to various reasons almost every major component in the system required redesign and engineering in order to meet the system requirements. The failures, probable cause and the final redesigns will be discussed as well as some thoughts on how better to specify system requirements for future systems

  7. Improvement of Candu-1000 MW(e) power cycle by moderator heat recovery

    International Nuclear Information System (INIS)

    Fath, H.E.S.

    1988-01-01

    Four different moderator heat recovery circuits are proposed for CANDU-1000 MW(e) reactors. The proposed circuits utilize all, or part, of the 155 MW(th) moderator heat load (at 70 0 C moderator outlet temperature from calandria) to the first stage of the feed water heating system. An economics study was carried out and indicated that the direct circulation of feed water through the moderator heat exchanger (with full heat recovery) is the most economical scheme. For this scheme the saved steam from the turbine extraction was found to produce additional electric power of 8 MW(e). This additional power represents a 0.7% increase in the plants nominal electric output. The outstanding features and advantages of the selected scheme are also presented. (author)

  8. Next generation CANDU plants

    International Nuclear Information System (INIS)

    Hedges, K.R.; Yu, S.K.W.

    1998-01-01

    Future CANDU designs will continue to meet the emerging design and performance requirements expected by the operating utilities. The next generation CANDU products will integrate new technologies into both the product features as well as into the engineering and construction work processes associated with delivering the products. The timely incorporation of advanced design features is the approach adopted for the development of the next generation of CANDU. AECL's current products consist of 700MW Class CANDU 6 and 900 MW Class CANDU 9. Evolutionary improvements are continuing with our CANDU products to enhance their adaptability to meet customers ever increasing need for higher output. Our key product drivers are for improved safety, environmental protection and improved cost effectiveness. Towards these goals we have made excellent progress in Research and Development and our investments are continuing in areas such as fuel channels and passive safety. Our long term focus is utilizing the fuel cycle flexibility of CANDU reactors as part of the long term energy mix

  9. Finite-fault slip model of the 2016 Mw 7.5 Chiloé earthquake, southern Chile, estimated from Sentinel-1 data

    Science.gov (United States)

    Xu, Wenbin

    2017-05-01

    Subduction earthquakes have been widely studied in the Chilean subduction zone, but earthquakes occurring in its southern part have attracted less research interest primarily due to its lower rate of seismic activity. Here I use Sentinel-1 interferometric synthetic aperture radar (InSAR) data and range offset measurements to generate coseismic crustal deformation maps of the 2016 Mw 7.5 Chiloé earthquake in southern Chile. I find a concentrated crustal deformation with ground displacement of approximately 50 cm in the southern part of the Chiloé island. The best fitting fault model shows a pure thrust-fault motion on a shallow dipping plane orienting 4° NNE. The InSAR-determined moment is 2.4 × 1020 Nm with a shear modulus of 30 GPa, equivalent to Mw 7.56, which is slightly lower than the seismic moment. The model shows that the slip did not reach the trench, and it reruptured part of the fault that ruptured in the 1960 Mw 9.5 earthquake. The 2016 event has only released a small portion of the accumulated strain energy on the 1960 rupture zone, suggesting that the seismic hazard of future great earthquakes in southern Chile is high.

  10. Comparative ranking of 0. 1-10 MW/sub e/ solar thermal electric power systems. Volume II. Supporting data. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, J.P.; Brown, K.C.; Finegold, J.G.; Gresham, J.B.; Herlevich, F.A.; Kriz, T.A.

    1980-07-01

    This report is part of a two-volume set summarizing the results of a comparative ranking of generic solar thermal concepts designed specifically for electric power generation. The original objective of the study was to project the mid-1990 cost and performance of selected generic solar thermal electric power systems for utility applications and to rank these systems by criteria that reflect their future commercial acceptance. This study considered plants with rated capacities of 1-10 MW/sub e/, operating over a range of capacity factors from the no-storage case to 0.7 and above. Later, the study was extended to include systems with capacities from 0.1 to 1 MW/sub e/, a range that is attractive to industrial and other nonutility applications. Volume I summarizes the results for the full range of capacities from 0.1 to 1.0 MW/sub e/. Volume II presents data on the performance and cost and ranking methodology.

  11. Initiation process of the Mw 6.2 central Tottori, Japan, earthquake on October 21, 2016: Stress transfer due to its largest foreshock of Mw 4.1

    Science.gov (United States)

    Noda, S.; Ellsworth, W. L.

    2017-12-01

    On October 21, 2016, a strike-slip earthquake with Mw 6.2 occurred in the central Tottori prefecture, Japan. It was preceded by a foreshock sequence that began with a Mw 4.1 event, the largest earthquake for the sequence, and lasted about two hours. According to the JMA catalog, the largest foreshock had a similar focal mechanism as the mainshock and was located in the immediate vicinity of the mainshock hypocenter. The goal of this study is to understand the relationship between the foreshock and the initial rupture of the mainshock. We first determine the relative hypocenter distance between the foreshock and mainshock using the P-wave onsets on Hi-net station records. The initiation points of the two events are likely about 100 m apart according to the current results, but could be closer. Within the location uncertainty, they might either be coplanar or on subparallel planes. Next, we obtain the slip-history models from a kinematic inversion method using empirical Green's functions derived from other foreshocks with M 2.2 - 2.4. The Mw 4.1 foreshock and Mw 6.2 mainshock started in a similar way until approximately 0.2 s after their onsets. For the foreshock, the rapid growth stage completed by 0.2 s even though the rupture propagation continued for 0.4 - 0.5 s longer (note that 0.2 s is significantly shorter than the typical source duration of a Mw 4.1 earthquake). On the other hand, the mainshock rupture continued to grow rapidly after 0.2 s. The comparison between the relative hypocenter locations and the slip models shows that the mainshock nucleated within the area strongly effected by both static and dynamic stress changes created by the foreshock. We also find that the mainshock initially propagated away from the foreshock hypocenter. We consider that the stress transfer process is a key to understand the mainshock nucleation as well as its rupture growth process.

  12. Seismic quiescence before the 2016 Mw 6.0 Amatrice earthquake, central Italy

    Science.gov (United States)

    Di Giovambattista, R.; Gentili, S.; Peresan, A.

    2017-12-01

    Seismic quiescence before major worldwide earthquakes has been reported by many authors. We have analyzed the seismicity preceding the last damaging 2016-2017 seismic sequence occurred in central Italy, and we have characterized the temporal and spatial extension of the foregoing seismic quiescence. The multiple mainshock sequence (24/08/2016, Mw 6.0; 26/10/2016 Mw 5.4 and 5.9; 30/10/2016, Mw 6.5), which occurred in central Italy, caused the death of nearly 300 people and widespread destruction of entire villages. The Mw 6.5 earthquake was the most powerful recorded in Italy since the 1980 M 6.9 Irpinia earthquake. The Region-Time-Length (RTL) method has been used to quantitatively analyze the seismic quiescence preceding the first Mw 6.0 Amatrice mainshock. This analysis was performed using the earthquake catalogue maintained by the Istituto Nazionale di Geofisica e Vulcanologia (INGV) declustered using a novel statistical approach, which is based on the "nearest-neighbor" distances between pairs of earthquakes in the space-time-energy domain. A well-evident quiescence that preceded the sequence was detected. The quiescence extended throughout a broad region north of the epicenter. The largest event of the sequence and its aftershocks covered most of the quiescence region, except for a small area to the west. The quiescence started from the beginning of September 2015 and lasted for approximately 1 year, up to the Amatrice mainshock. The results obtained have been compared with those of previous seismic sequences occurred in Italy. A similar analysis applied to the 1997-1998, Mw 5.7 Umbria-Marche earthquakes located at the northern termination of the Amatrice sequence, showed a decrease in RTL corresponding to a seismic quiescence, followed by a foreshock activation in the epicentral area before the occurrence of the mainshock.

  13. Sequence Control System of 1-MW CW Klystron for the PEFP

    CERN Document Server

    Park, Byoung R; Chun Myung Hwan; Han Yeung Jin; Hyo Jeong Maeng; Kim Sung Chul; Yang Jae Seok; Yu In Ha

    2005-01-01

    Sequence control system of 1-MW CW klystron for the PEFP (Proton Engineering Frontier Project) has been developed in order to drive the 1-MW klystron amplifier. The system is able to control several power supplies and many environment conditions. The hardware of sequence control and the interlock system are based on the Allen-Bradley's SLC500 Program Logic Controller (PLC). Also the system can be controlled by a touch screen at local mode or Ethernet network with high level HMI at remote mode.

  14. Aeroelastic Optimization of a 10 MW Wind Turbine Blade with Active Trailing Edge Flaps

    DEFF Research Database (Denmark)

    Barlas, Athanasios; Tibaldi, Carlo; Zahle, Frederik

    2016-01-01

    This article presents the aeroelastic optimization of a 10MW wind turbine ‘smart blade’ equipped with active trailing edge flaps. The multi-disciplinary wind turbine analysis and optimization tool HawtOpt2 is utilized, which is based on the open-source framework Open-MDAO. The tool interfaces...... to several state-of-the art simulation codes, allowing for a wide variety of problem formulations and combinations of models. A simultaneous aerodynamic and structural optimization of a 10 MW wind turbine rotor is carried out with respect to material layups and outer shape. Active trailing edge flaps...

  15. The safety feature of hydraulic driving system of control rod for 200 MW nuclear heating reactor

    International Nuclear Information System (INIS)

    Chi Zongbo; Wu Yuanqiang

    1997-01-01

    The hydraulic driving system of control rod is used as control rod drive mechanism in 200 MW nuclear heating reactor. Design of this system is based on passive system, integrating drive and guide of control rod. The author analyzes the inherent safety and the design safety of this system, with mechanism of control rod not ejecting when the pressure of pressure vessel is lost, and calculating result of core not exposing when the amount of coolant is drained by broken pipe. The results indicate that this system has good safety feature, and assures reactor safety under any accident conditions, providing important technology support for 200 MW nuclear heating reactor with inherent safety feature

  16. Design considerations in achieving 1 MW CW operation with a whispering-gallery-mode gyrotron

    International Nuclear Information System (INIS)

    Felch, K.; Feinstein, J.; Hess, C.; Huey, H.; Jongewaard, E.; Jory, H.; Neilson, J.; Pendleton, R.; Pirkle, D.; Zitelli, L.

    1989-09-01

    Varian is developing high-power, CW gyrotrons at frequencies in the range 100 GHz to 150 GHz, for use in electron cyclotron heating applications. Early test vehicles have utilized a TE 15,2,1 interaction cavity, have achieved short-pulse power levels of 820 kW and average power levels of 80 kW at 140 GHz. Present tests are aimed at reaching 400 kW under CW operating conditions and up to 1 MW for short pulse durations. Work is also underway on modifications to the present design that will enable power levels of up to 1 MW CW to be achieved. 7 refs., 2 figs

  17. GASIFICATION FOR DISTRIBUTED GENERATION

    Energy Technology Data Exchange (ETDEWEB)

    Ronald C. Timpe; Michael D. Mann; Darren D. Schmidt

    2000-05-01

    A recent emphasis in gasification technology development has been directed toward reduced-scale gasifier systems for distributed generation at remote sites. The domestic distributed power generation market over the next decade is expected to be 5-6 gigawatts per year. The global increase is expected at 20 gigawatts over the next decade. The economics of gasification for distributed power generation are significantly improved when fuel transport is minimized. Until recently, gasification technology has been synonymous with coal conversion. Presently, however, interest centers on providing clean-burning fuel to remote sites that are not necessarily near coal supplies but have sufficient alternative carbonaceous material to feed a small gasifier. Gasifiers up to 50 MW are of current interest, with emphasis on those of 5-MW generating capacity. Internal combustion engines offer a more robust system for utilizing the fuel gas, while fuel cells and microturbines offer higher electric conversion efficiencies. The initial focus of this multiyear effort was on internal combustion engines and microturbines as more realistic near-term options for distributed generation. In this project, we studied emerging gasification technologies that can provide gas from regionally available feedstock as fuel to power generators under 30 MW in a distributed generation setting. Larger-scale gasification, primarily coal-fed, has been used commercially for more than 50 years to produce clean synthesis gas for the refining, chemical, and power industries. Commercial-scale gasification activities are under way at 113 sites in 22 countries in North and South America, Europe, Asia, Africa, and Australia, according to the Gasification Technologies Council. Gasification studies were carried out on alfalfa, black liquor (a high-sodium waste from the pulp industry), cow manure, and willow on the laboratory scale and on alfalfa, black liquor, and willow on the bench scale. Initial parametric tests

  18. Nuclear renaissance in Asia. Energy security and development of nuclear power generation system

    International Nuclear Information System (INIS)

    Nakasugi, Hideo

    2009-01-01

    The energy policy and strategy of development of nuclear power generation system of China, India and Korea are stated on the basis of use of light water reactors (LWRs). The conditions of power generation and introduction plans of nuclear energy of other Asian countries such as Vietnam, Thailand, Indonesia, Malaysia and Philippines are described. The power plant capacity of China increased from 50,500 MW in 2004, to 65,000 MW in 2005, and the target value is 40,000 MW of operating nuclear plants and 18,000 MW in building in 2020. China is lagging behind in peaceful use of nuclear energy technologies. A plan for the reform of nuclear industry and nuclear power generation projects of China are summarized. Total power plant capacity of India is 145,000 MW, but the nuclear plant capacity is 4,120 MW in 2008 and 63,000 MW of the target in 2032. Development of nuclear power, circumstance, and cooperation with other countries' industries are explained. 17,716 MW of nuclear power is in operation, 6,800 MW in building and 2,800 MW in the planning stage in Korea. History of development of national reactors and the subjects of development of the fourth generation reactor of Korea are stated. Management system of nuclear power plants in China, technical bases of nuclear power plants in China, development system of nuclear power generation in India, the conditions of power production of Korea in 2008, the capacity factor of Korea, Japan and world from 1998 to 2008, and comparison of nuclear industries in China, India and Korea are illustrated. (S.Y.)

  19. A 22 MW pilot plant with an ammonia bottoming cycle is being tested by Electricite de France

    International Nuclear Information System (INIS)

    Fleury, J.; Bellot, C.

    1989-01-01

    EDF's DER has built a 22 MW ammonia bottoming cycle pilot power plant in Gennevilliers near Paris. This construction marks a turning point in the development of bottoming cycles which was undertaken at EDF in 1970. These cycles could be used in powerful PWR plants. The key feature of this type of plant is its appreciable capacity gain when the temperature of the heat sink drops. Thus, with a heat sink of the dry cooling tower type, low air temperatures in winter can be turned to use to produce more energy when demand is at its highest. At the same time, with dry cooling towers, a tiresome constraint vanishes since the plant location choice does no longer depend on the existence of a water reservoir in the vicinity of the plant. The construction of the pilot plant Cybiam began in 1980. Its steam turbine-generator set was coupled to the French network in March 1986 and its ammonia turbine-generator set in December 1986. The full load was attained on June 4th 1987. The main problems met during its commissioning are described in this paper as well as the first test results. From the economic point of view, the money value of the extra power generated during cold spells is assessed

  20. The isolated ˜680 km deep 30 May 2015 MW 7.9 Ogasawara (Bonin) Islands earthquake

    Science.gov (United States)

    Ye, Lingling; Lay, Thorne; Zhan, Zhongwen; Kanamori, Hiroo; Hao, Jin-Lai

    2016-01-01

    Deep-focus earthquakes, located in very high-pressure conditions 300 to 700 km below the Earth's surface within sinking slabs of relatively cold oceanic lithosphere, are mysterious phenomena. The largest recorded deep-focus earthquake (MW 7.9) in the Izu-Bonin slab struck on 30 May 2015 beneath the Ogasawara (Bonin) Islands, isolated from prior seismicity by over 100 km in depth, and followed by only a few small aftershocks. Globally, this is the deepest (680 km centroid depth) event with MW ≥ 7.8 in the seismological record. Seismicity indicates along-strike contortion of the Izu-Bonin slab, with horizontal flattening near a depth of 550 km in the Izu region and rapid steepening to near-vertical toward the south above the location of the 2015 event. This event was exceptionally well-recorded by seismic stations around the world, allowing detailed constraints to be placed on the source process. Analyses of a large global data set of P, SH and pP seismic phases using short-period back-projection, subevent directivity, and broadband finite-fault inversion indicate that the mainshock ruptured a shallowly-dipping fault plane with patchy slip that spread over a distance of ∼40 km with a multi-stage expansion rate (∼ 5 + km /s down-dip initially, ∼3 km/s up-dip later). During the 17 s total rupture duration the radiated energy was ∼ 3.3 ×1016 J and the stress drop was ∼38 MPa. The radiation efficiency is moderate (0.34), intermediate to that of the 1994 Bolivia and 2013 Sea of Okhotsk MW 8.3 deep earthquakes, indicating that source processes of very large deep earthquakes sample a wide range of behavior from dissipative, more viscous failure to very brittle failure. The isolated occurrence of the event, much deeper than the apparently thermally-bounded distribution of Bonin-slab seismicity above 600 km depth, suggests that localized stress concentration associated with the pronounced deformation of the Izu-Bonin slab and proximity to the 660-km phase

  1. Distributed generation hits market

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The pace at which vendors are developing and marketing gas turbines and reciprocating engines for small-scale applications may signal the widespread growth of distributed generation. Loosely defined to refer to applications in which power generation equipment is located close to end users who have near-term power capacity needs, distributed generation encompasses a broad range of technologies and load requirements. Disagreement is inevitable, but many industry observers associate distributed generation with applications anywhere from 25 kW to 25 MW. Ten years ago, distributed generation users only represented about 2% of the world market. Today, that figure has increased to about 4 or 5%, and probably could settle in the 20% range within a 3-to-5-year period, according to Michael Jones, San Diego, Calif.-based Solar Turbines Inc. power generation marketing manager. The US Energy Information Administration predicts about 175 GW of generation capacity will be added domestically by 2010. If 20% comes from smaller plants, distributed generation could account for about 35 GW. Even with more competition, it's highly unlikely distributed generation will totally replace current market structures and central stations. Distributed generation may be best suited for making market inroads when and where central systems need upgrading, and should prove its worth when the system can't handle peak demands. Typical applications include small reciprocating engine generators at remote customer sites or larger gas turbines to boost the grid. Additional market opportunities include standby capacity, peak shaving, power quality, cogeneration and capacity rental for immediate demand requirements. Integration of distributed generation systems--using gas-fueled engines, gas-fired combustion engines and fuel cells--can upgrade power quality for customers and reduce operating costs for electric utilities

  2. Design of a 60 MW CFB gasification system (CGAS) for Uganda : utilising rice husks as input fuel

    Energy Technology Data Exchange (ETDEWEB)

    Amanyire, F. [Gulu Univ., Gulu (Uganda). Dept. of Biosystems Engineering; Bagamuhunda, D.B. [Uganda Industrial Research Inst., Technology Development Centre, Kampala (Uganda)

    2010-07-01

    In Uganda, biomass comprises more than 95 per cent of the total energy supply. Agricultural residues are a major source of energy that can be converted into producer gas in biomass gasifiers. The high poverty levels in Uganda can be attributed in part to the fact that more than 90 per cent of the population does not have access to electricity due to limited and unreliable electricity produced in the country. A circulating fluidized bed (CFB) gasification system was designed in this study in order to generate a system for the effective use of agricultural wastes for energy production. Rice husks were used as the feedstock for a power output of 60 MW. The gasification system was designed using ERGUN CFB software with available theoretical and experimental data. The design comprises a reactor subsystem, air distribution plate, cyclone, air inlet and fuel feeding systems. The reactor is 10 m high and has a fuel flow rate of 8.1 kg/s. The inlet air flow rate is 11 m{sup 3}/s and the fluidization velocity is 0.9 m/s, with a pressure drop in the bed of 1.5 kPa. The inlet gas velocity of the reactor is 25.2 m/s with about 99 per cent cyclone efficiency and less than 1 kPa pressure drop in cyclone. It has a cold gas efficiency of 50 per cent. It was concluded that the gasifier can produce 60 MW of electricity from locally available and environmentally sound biomass energy sources.

  3. JET flywheel generators

    International Nuclear Information System (INIS)

    Huart, M.; Sonnerup, L.

    1986-01-01

    Two large vertical shaft flywheel generators each provides the JET device with peak power up to 400 MW and energy up to 2600 MJ per pulse to induce and confine the multi-mega-ampere plasma current. The integrated rotor flywheel consists of a 650 tonne/10 m diameter rim carrying the poles of the machine. The energy is stored kinetically during a 9 min interval of acceleration from half-speed to full-speed and then released during a 20 s long deceleration. A design life of 100 000 cycles at full energy rating was specified. The mechanical design and construction of the generators is reviewed. Particular attention is paid to the assessment of the stresses and fatigue life of the rotor system, its dynamic behaviour (rim movement, critical speed and balancing) and on the performance in operation of the large thrust bearing. (author)

  4. Magnetohydrodynamic generator and pump system

    International Nuclear Information System (INIS)

    Birzvalk, Yu.A.; Karasev, B.G.; Lavrentyev, I.V.; Semikov, G.T.

    1983-01-01

    The MHD generator-pump system, or MHD coupling, is designed to pump liquid-metal coolant in the primary circuit of a fast reactor. It contains a number of generator and pump channels placed one after another and forming a single electrical circuit, but hydraulically connected parallel to the second and first circuits of the reactor. All the generator and pump channels are located in a magnetic field created by the magnetic system with an excitation winding that is fed by a regulated direct current. In 500 to 2000 MW reactors, the flow rate of the coolant in each loop of the primary circuit is 3 to 6 m 3 /s and the hydraulic power is 2 to 4 MW. This paper examines the primary characteristics of an MHD generator-pump system with various dimensions and number of channels, wall thicknesses, coolant flow rates, and magnetic fields. It is shown that its efficiency may reach 60 to 70%. The operating principle of the MHD generator-pump system is explained in the referenced patent and involves the transfer of hydraulic power from generator channels to pump channels using a magnetic field and electrical circuit common to both channels. Variations of this system may be analyzed using an equivalent circuit. 7 refs., 5 figs

  5. Modelling and simulation of containment on full scope simulator for Qinshan 300 MW Nuclear Power Unit

    International Nuclear Information System (INIS)

    Zou Tingyun

    1996-01-01

    A multi-node containment thermal-hydraulic model has been developed and adapted in Full Scope Simulator for Qinshan 300 MW Nuclear Power Unit with good realtime simulation effects. Containment pressure for LBLOCA calculated by the model is well agreed with those of CONTEMPT-4/MOD3

  6. Reliability-based inspection planning of 20MW offshore wind turbine jacket

    DEFF Research Database (Denmark)

    Gintautas, Tomas; Sørensen, John Dalsgaard

    2018-01-01

    This paper presents the application of a risk and reliability based inspection planning framework (RBI) for the InnWind 20MW reference wind turbine jacket sub-structure. A detailed fracture mechanics based fatigue crack growth model is developed and used as basis to derive optimal inspection plans...

  7. Start-up analysis of INET-5 MW district heating prototype reactor

    International Nuclear Information System (INIS)

    Li Tianshu

    1991-09-01

    The main features and thermohydraulic design parameters of the INET-5 MW reactor (INET: Institute of Nuclear Technology of Tsinghua University, Beijing) are presented. The start-up process and the effect of thermohydraulic instability on start-up process have been analyzed. The main obstacle of start-up process of INET-5 MW reactor is to pass the instability region from 1 atm to normal operation condition. For avoiding instability, the start-up process should be divided into two steps. The results of three different start-up proposals calculated by DACOL code are given and compared. The possibility of instabilities for each proposal has been checked. The checked results show that there is no instability during start-up of the three proposals. So, it is supposed that the INET-5 MW reactor can safely and stably reach the operation conditions. Finally, some conclusions about the effect of instability on start-up in boiling mode of INET-5MW reactor are given

  8. Developing an international consortium to build an 800 MW coal fired power plant in Indonesia

    International Nuclear Information System (INIS)

    Jones, R.H.; Hashima, T.

    1990-01-01

    This paper describes the cooperative construction of a fossil-fueled power plant in Indonesia. The topics discussed in the paper include energy use and the market for electric power, fuel resources, history of business activities, the role of joint resources and government business policy, and preparing for bidding an 800MW coal-fired power plant

  9. Two fixed point theorems on quasi-metric spaces via mw- distances

    Energy Technology Data Exchange (ETDEWEB)

    Alegre, C.

    2017-07-01

    In this paper we prove a Banach-type fixed point theorem and a Kannan-type theorem in the setting of quasi-metric spaces using the notion of mw-distance. These theorems generalize some results that have recently appeared in the literature. (Author)

  10. Revisiting the Canterbury earthquake sequence after the 14 February 2016 Mw 5.7 event

    NARCIS (Netherlands)

    Herman, Matthew W.; Furlong, Kevin P.

    2016-01-01

    On 14 February 2016, an Mw 5.7 (GNS Science moment magnitude) earthquake ruptured offshore east of Christchurch, New Zealand. This earthquake occurred in an area that had previously experienced significant seismicity from 2010 to 2012 during the Canterbury earthquake sequence, starting with the 2010

  11. Potentials for site-specific design of MW sized wind turbines

    DEFF Research Database (Denmark)

    Thomsen, K.; Fuglsang, P.; Schepers, G.

    2001-01-01

    The potential for site specific design of MW sized wind turbines is quantified by comparing design loads for wind turbines installed at a range of different sites. The sites comprise on-shore normal flat terrain stand-alone conditions and wind farm conditions together with offshore and mountainous...

  12. VizieR Online Data Catalog: Very metal poor stars in MW halo (Mashonkina+, 2017)

    Science.gov (United States)

    Mashonkina, L.; Jablonka, P.; Sitnova, T.; Pakhomov, Yu; North, P.

    2017-10-01

    Tables 3 and 4 from the article are presented. They include the LTE and NLTE abundances from individual lines and average abundances of the investigated stars in the dSphs Sculptor (Scl), Ursa Minor (UMi), Fornax (Fnx), Sextans (Sex), Bootes I (Boo), UMa II, and Leo IV and the Milky Way (MW) halo. (3 data files).

  13. Robustness of MW-Level IGBT modules against gate oscillations under short circuit events

    DEFF Research Database (Denmark)

    Reigosa, Paula Diaz; Wu, Rui; Iannuzzo, Francesco

    2015-01-01

    The susceptibility of MW-level IGBT power modules to critical gate voltage oscillations during short circuit events has been evidenced experimentally. This paper proposes a sensitivity analysis method to better understand the oscillating behavior dependence on different operating conditions (i...... the oscillation phenomenon, as well as to further improve the device performance during short circuit....

  14. Design of project management system for 10 MW high temperature gas-cooled test reactor

    International Nuclear Information System (INIS)

    Zhu Yan; Xu Yuanhui

    1998-01-01

    A framework of project management information system (MIS) for 10 MW high temperature gas-cooled test reactor is introduced. Based on it, the design of nuclear project management information system and project monitoring system (PMS) are given. Additionally, a new method of developing MIS and Decision Support System (DSS) has been tried

  15. Label-Free Biosensors Based on Bimodal Waveguide (BiMW) Interferometers.

    Science.gov (United States)

    Herranz, Sonia; Gavela, Adrián Fernández; Lechuga, Laura M

    2017-01-01

    The bimodal waveguide (BiMW) sensor is a novel common path interferometric transducer based on the evanescent field detection principle, which in combination with a bio-recognition element allows the direct detection of biomolecular interactions in a label-free scheme. Due to its inherent high sensitivity it has great potential to become a powerful analytical tool for monitoring substances of interest in areas such as environmental control, medical diagnostics and food safety, among others. The BiMW sensor is fabricated using standard silicon-based technology allowing cost-effective production, and meeting the requirements of portability and disposability necessary for implementation in a point-of-care (POC) setting.In this chapter we describe the design and fabrication of the BiMW transducer, as well as its application for bio-sensing purposes. We show as an example the biosensor capabilities two different applications: (1) the immunodetection of Irgarol 1051 biocide useful in the environmental field, and (2) the detection of human growth hormone as used in clinical diagnostics. The detection is performed in real time by monitoring changes in the intensity pattern of light exiting the BiMW transducer resulting from antigen-antibody interactions on the surface of the sensor.

  16. Brief introduction to project management of full scope simulator for Qinshan 300 MW Nuclear Power Unit

    International Nuclear Information System (INIS)

    Chen Jie

    1996-01-01

    The key points in development and engineering project management of full scope simulator for Qinshan 300 MW Nuclear Power Unit are briefly introduced. The Gantt chart, some project management methods and experience are presented. The key points analysis along with the project procedure will be useful to the similar project

  17. NedWind with 80 MW wind power capacity leader in the Netherlands

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    At 31 December 1995 1050 wind turbines were in operation in the Netherlands with a total capacity of 255 MW. An overview is given of the top locations of wind turbines in different categories and from different manufacturers and owners. The wind turbine manufacturer NedWind is leading the field. 9 figs

  18. Emergency planning and emergency drill for a 5 MW district heating reactor

    International Nuclear Information System (INIS)

    Shi Zhongqi; Wu Zhongwang; Hu Jingzhong; Feng Yuying; Li Zhongsan; Dong Shiyuan

    1991-01-01

    The authors describes the main contents of the emergency planning for a 5 MW nuclear district heating reactor and some considerations for the planning's making, and presents the situation on implementing emergency preparedness and an emergency drill that has been carried out

  19. Control conception for REP 1300 MW units of the Electricite de France

    International Nuclear Information System (INIS)

    Blanc, P.; Guesnier, G.

    1986-01-01

    The paper describes the control equipment for the REP 1300 MW units including the reactor protection system, the control rods drive system and nuclear instrumentation, the control of the auxiliaries in the systems important for the reactor safety and the safety survey computer. Finally, the digital connections between different control systems are presented

  20. Smart Grids and Distributed Generation

    Directory of Open Access Journals (Sweden)

    Dorin BICĂ

    2018-06-01

    Full Text Available This paper describes the main characteristics of Smart Grids and distributed generation. Smart Grids can be defined as a modernization of the power system so it monitors, protects and automatically optimizes the operation of its interconnected elements (power plants, transmission and distribution system, industrial and residential loads. Distributed generation (DG refers to the production of electricity near the consumption place using renewable energy sources. A load flow analysis is performed for the IEEE14 system in which a DG source (a 5MW wind turbine is added that is on-grid or off-grid. The power losses are determined for these two cases.

  1. PS main supply: motor-generator set.

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    In picture 04 the motor is on the right in the background and the main view is of the generator. The peak power in each PS cycle drawn from the generator, up to 96 MW, is taken from the rotational kinetic energy of the rotor (a heavy-weight of 80 tons), which makes the rotational speed drop by only a few percent. The motor replenishes the average power of 2 to 4 MW. Photo 05: The motor-generator set is serviced every year and, in particular, bearings and slip-rings are carefully checked. To the left is the motor with its slip-rings visible. It has been detached from the axle and moved to the side, so that the rotor can be removed from the huge generator, looming at the right.

  2. Coulomb Stress Change and Seismic Hazard of Rift Zones in Southern Tibet after the 2015 Mw7.8 Nepal Earthquake and Its Mw7.3 Aftershock

    Science.gov (United States)

    Dai, Z.; Zha, X.; Lu, Z.

    2015-12-01

    In southern Tibet (30~34N, 80~95E), many north-trending rifts, such as Yadong-Gulu and Lunggar rifts, are characterized by internally drained graben or half-graben basins bounded by active normal faults. Some developed rifts have become a portion of important transportation lines in Tibet, China. Since 1976, eighty-seven >Mw5.0 earthquakes have happened in the rift regions, and fifty-five events have normal faulting focal mechanisms according to the GCMT catalog. These rifts and normal faults are associated with both the EW-trending extension of the southern Tibet and the convergence between Indian and Tibet. The 2015 Mw7.8 Nepal great earthquake and its Mw7.3 aftershock occurred at the main Himalayan Thrust zone and caused tremendous damages in Kathmandu region. Those earthquakes will lead to significant viscoelastic deformation and stress changes in the southern Tibet in the future. To evaluate the seismic hazard in the active rift regions in southern Tibet, we modeled the slip distribution of the 2015 Nepal great earthquakes using the InSAR displacement field from the ALOS-2 satellite SAR data, and calculated the Coulomb failure stress (CFS) on these active normal faults in the rift zones. Because the estimated CFS depends on the geometrical parameters of receiver faults, it is necessary to get the accurate fault parameters in the rift zones. Some historical earthquakes have been studied using the field data, teleseismic data and InSAR observations, but results are in not agreement with each other. In this study, we revaluated the geometrical parameters of seismogenic faults occurred in the rift zones using some high-quality coseismic InSAR observations and teleseismic body-wave data. Finally, we will evaluate the seismic hazard in the rift zones according to the value of the estimated CFS and aftershock distribution.

  3. HFBR restart activity A2.6: Review of FSAR and 60 MW addendum to assure consistency of operation at 40 MW

    International Nuclear Information System (INIS)

    Rao, D.V.; Ross, S.B.; Darby, J.L.; Clark, R.A.

    1990-01-01

    The purpose of this task (HFBR Restart Activity A2.6) is to perform a review of the design basis accident (DBA) analyses sections of the 1964 HFBR-Final Safety Analysis Report; Volumes I and II, and the 1982 Addendum to the HFBR-FSAR for 60 MW operation to assure that operation at 40 MW will be consistent with these analyses. Additional documents utilized in the review included the Level 1 PRA for HFBR, HFBR-PDMs and HFBR-OPMs. The review indicates that the 1964 FSAR-DBA analysis in incomplete in the sense that it did not analyze some of the important initiators for 1-loop operation that include: Accidental throttling of primary flow control valves; seizure of primary pump; loss of secondary pump; accidental throttling of secondary flow control valves; rupture of secondary piping. The first three initiators were later studied in the 1982 addendum. The other two initiators have not been examined to-date for 1-loop operation. It is recommended that the impact of these initiators be assessed prior to the restart, if 1-loop operation is chosen for the restart. The review demonstrated that at 40 MW operation there are only a few accident initiators that will culminate in core damage (fuel melting and /or cladding failure) regardless of the availability of mitigating systems. For 1-loop Operation these accidents include: Fuel channel blockage, primary pump seizure, and large-large LOCA (a LOCA with effective break diameter > 2.81 in. is referred to as a large-large LOCA in this document as well as in PRA). Although all these accidents listed above could lead to core damage for 1-loop operation as well, the probability is expected be very low

  4. Feasibility study 6 MW Multiwind MWT 6000 Triple Rotor Offshore Wind Turbine

    International Nuclear Information System (INIS)

    De Vries, E.

    2000-08-01

    This report contains results of a feasibility study carried out between September 1999 and January 2000. Multi-rotor technology is rather complex compared to conventional wind turbines, largely due to the increased number of components and (sub)systems. There are on the other hand also indications that the application of MULTIWIND features like the turnable subframe has the potential for a substantial reduction in energy generating costs. The study commenced with a set of preconditions and parameters like masses, dimensions, design features, indicative safety and control systems, etc. The key question to be answered was: 'is it possible to design a large 5 - 6 MW multi-rotor offshore wind turbine which can compete with comparable wind turbines of the same capacity and a single rotor, on the basis of overall concept, market acceptance and Costs of Energy (COE)? The main objectives are (1) to improve understanding of primary dynamic system interactions; (2) to quantify 'white spots' in the MULTIWIND know-how base (solvable problems with state-of-the-art solutions and not (immediately) solvable problems, requiring a technological breakthrough); and (3) to determine critical design parameters for various systems and alternative solutions. Secondary objectives were to analyse various concepts on the basis of technical aspects and Costs Of Energy (COE). The expected results are (1) a viable prototype concept based on proven state-of-the-art design solutions; and (2) clear outlines of a workable and cost effective installation and O and M strategy for large MWT-system optimised offshore wind power plants. For the methodology an integrated concept design approach has been adopted. This is considered essential from a project management, system dynamics, and COE points of view. Starting point were conclusions and recommendations of the lv-Marcon report. The structural design commenced with the positioning of the main yawing system and the conceptual dimensioning of the main

  5. Seismotectonics of the 6 February 2012 Mw 6.7 Negros Earthquake, central Philippines

    Science.gov (United States)

    Aurelio, M. A.; Dianala, J. D. B.; Taguibao, K. J. L.; Pastoriza, L. R.; Reyes, K.; Sarande, R.; Lucero, A.

    2017-07-01

    At 03:49 UTC on the 6th of February 2012, Negros Island in the Visayan region of central Philippines was struck by a magnitude Mw 6.7 earthquake causing deaths of over 50 people and tremendous infrastructure damage leaving hundreds of families homeless. The epicenter was located in the vicinity of the eastern coastal towns of La Libertad and Tayasan of the Province of Negros Oriental. Earthquake-induced surface deformation was mostly in the form of landslides, liquefaction, ground settlement, subsidence and lateral spread. There were no clear indications of a fault surface rupture. The earthquake was triggered by a fault that has not been previously recognized. Earthquake data, including epicentral and hypocentral distributions of main shock and aftershocks, and focal mechanism solutions of the main shock and major aftershocks, indicate a northeast striking, northwest dipping nodal plane with a reverse fault mechanism. Offshore seismic profiles in the Tañon Strait between the islands of Negros and Cebu show a northwest dipping reverse fault consistent in location, geometry and mechanism with the nodal plane calculated from earthquake data. The earthquake generator is here proposed to be named the Negros Oriental Thrust (NOT). Geologic transects established from structural traverses across the earthquake region reveal an east-verging fold-thrust system. In the latitude of Guihulngan, this fold-thrust system is represented by the Razor Back Anticline - Negros Oriental Thrust pair, and by the Pamplona Anticline - Yupisan Thrust pair in the latitude of Dumaguete to the south. Together, these active fold-thrust systems are causing active deformation of the western section of the Visayan Sea Basin under a compressional tectonic regime. This finding contradicts previous tectonic models that interpret the Tañon Strait as a graben, bounded on both sides by normal faults supposedly operating under an extensional regime. The Negros Earthquake and the active fold

  6. Cold test measurements on components of the 1 MW, 140 GHz, CW gyrotron for the stellarator Wendelstein 7-X

    International Nuclear Information System (INIS)

    Dammertz, G.; Alberti, S.; Arnold, A.; Giguet, E.; LeGoff, Y.; Thumm, M.

    2001-01-01

    For the development of a 1 MW, 140 GHz gyrotron for CW operation which will be installed at the stellarator facility Wendelstein 7-X at IPP Greifswald, a collaboration between different European research institutes and an industrial company has been established. In order to prove the proper functioning of the millimeter wave components installed in the gyrotron -- such as the cavity, the waveguide taper and the quasioptical mode converter -- these components should be cold tested, preferably before installation. However, due to lack of time as well as long delivery times, this was not possible. Therefore, two units of the quasioptical mode converter and the cavity were fabricated with identical geometry, one of those being used for measurements on the low power test device. To perform these cold tests for tapers and mode converters, the gyrotron cavity output mode has to be simulated. This means that a high order rotating mode (TE 28,8 mode) must be generated at low power. This can be achieved by means of a mode generator consisting of two mirrors and a coaxial cavity with a perforated outer wall. Before applying the mode generator to the components, its proper behavior and the accurate alignment of the system must be verified either by radiation pattern measurements or k-spectrometer measurements. As the coupling through the holes of the k-spectrometer is extremely low, a special vector network analyzer with a dynamic range of at least 100 dB had to be developed. This has been achieved by integration of a phase locked backward-wave oscillator with a line width of 100 Hz and an output power of 10 mW. A non-destructive measurement of the resonance frequency and the quality factor of the cavity does not seem possible. The second cavity will be prepared for the cold measurement by drilling a small radial hole into its wall in the plane of the field maximum. This hole is then used for the input coupling. The accuracy required for this hole is rather critical. The

  7. Low stress drops observed for aftershocks of the 2011 Mw 5.7 Prague, Oklahoma, earthquake

    Science.gov (United States)

    Sumy, Danielle F.; Neighbors, Corrie J.; Cochran, Elizabeth S.; Keranen, Katie M.

    2017-01-01

    In November 2011, three Mw ≥ 4.8 earthquakes and thousands of aftershocks occurred along the structurally complex Wilzetta fault system near Prague, Oklahoma. Previous studies suggest that wastewater injection induced a Mw 4.8 foreshock, which subsequently triggered a Mw 5.7 mainshock. We examine source properties of aftershocks with a standard Brune-type spectral model and jointly solve for seismic moment (M0), corner frequency (f0), and kappa (κ) with an iterative Gauss-Newton global downhill optimization method. We examine 934 earthquakes with initial moment magnitudes (Mw) between 0.33 and 4.99 based on the pseudospectral acceleration and recover reasonable M0, f0, and κ for 87 earthquakes with Mw 1.83–3.51 determined by spectral fit. We use M0 and f0 to estimate the Brune-type stress drop, assuming a circular fault and shear-wave velocity at the hypocentral depth of the event. Our observations suggest that stress drops range between 0.005 and 4.8 MPa with a median of 0.2 MPa (0.03–26.4 MPa with a median of 1.1 MPa for Madariaga-type), which is significantly lower than typical eastern United States intraplate events (>10 MPa). We find that stress drops correlate weakly with hypocentral depth and magnitude. Additionally, we find the stress drops increase with time after the mainshock, although temporal variation in stress drop is difficult to separate from spatial heterogeneity and changing event locations. The overall low median stress drop suggests that the fault segments may have been primed to fail as a result of high pore fluid pressures, likely related to nearby wastewater injection.

  8. Proposition of primary methods for nitrogen oxides emissions reduction at coal-fired 200 MW power unit (Yugoslavia)

    International Nuclear Information System (INIS)

    Repic, B.; Mladenovic, R.; Crnomarkovic, N.

    1997-01-01

    The combustion of coal is followed by increased pollution of the environment with toxic products. Together with the generation of other pollutants, the emission of nitrogen oxides (NO x ) represents, due to its high toxicity, a great environmental risk. Appropriate measures must be taken for lowering NO x emission, both on new facilities and those already in operation. Basic technologies (primary reduction methods) of several generations, developed until now and used in practice, are presented in the paper. The technologies applicable on domestic facilities and adjusted to domestic coals have been given particular consideration. Proposition of primary methods for NO x emission reduction at coal-fired 200 MW power unit at TPS 'Nikola Tesla' is analyzed. The following methods have been considered in detail: flue gases recirculation, multi-stage combustion, low-NO x burners, additional over-fire air, multi-stage air intake into the furnace, staged fuel injection, grinding fineness increase, etc. Considerations were performed according to existing constructive characteristics of the furnace and the burners, and characteristics of used fuels, i. e. lignites from Kolubara pit. (Author)

  9. Calculation of design load for the MOD-5A 7.3 mW wind turbine system

    Science.gov (United States)

    Mirandy, L.; Strain, J. C.

    1995-01-01

    Design loads are presented for the General Electric MOD-SA wind turbine. The MOD-SA system consists of a 400 ft. diameter, upwind, two-bladed, teetered rotor connected to a 7.3 mW variable-speed generator. Fatigue loads are specified in the form of histograms for the 30 year life of the machine, while limit (or maximum) loads have been derived from transient dynamic analysis at critical operating conditions. Loads prediction was accomplished using state of the art aeroelastic analyses developed at General Electric. Features of the primary predictive tool - the Transient Rotor Analysis Code (TRAC) are described in the paper. Key to the load predictions are the following wind models: (1) yearly mean wind distribution; (2) mean wind variations during operation; (3) number of start/shutdown cycles; (4) spatially large gusts; and (5) spatially small gusts (local turbulence). The methods used to develop statistical distributions from load calculations represent an extension of procedures used in past wind programs and are believed to be a significant contribution to Wind Turbine Generator analysis. Test/theory correlations are presented to demonstrate code load predictive capability and to support the wind models used in the analysis. In addition MOD-5A loads are compared with those of existing machines. The MOD-5A design was performed by the General Electric Company, Advanced Energy Program Department, under Contract DEN3-153 with NASA Lewis Research Center and sponsored by the Department of Energy.

  10. Dynamics of 'abc' and 'qd' constant parameters induction generator model

    DEFF Research Database (Denmark)

    Fajardo-R, L.A.; Medina, A.; Iov, F.

    2009-01-01

    In this paper, parametric sensibility effects on dynamics of the induction generator in the presence of local perturbations are investigated. The study is conducted in a 3x2 MW wind park dealing with abc, qd0 and qd reduced order, induction generator model respectively, and with fluxes as state...

  11. Motor-Generator powering the PS (Proton Synchrotron) main magnets

    CERN Multimedia

    1983-01-01

    This motor-generator,30 MW peak, 1500 r.p.m.,pulsed power supply for the PS main magnet replaced in 1968 the initial 3000 r.p.m. motor-generator-flywheel set which had served from the PS start-up in 1959 until end 1967. See also photo 8302337 and its abstract.

  12. SIROCCO project: 15 advanced instructor desk and 4 simulated control room for 900MW and 1300MW EDF power plant simulators

    International Nuclear Information System (INIS)

    Alphonse, J.; Roth, P.; Sicard, Y.; Rudelli, P.

    2006-01-01

    This presentation describes the fifteen advanced instructors station and four simulated control delivered to EDF in the frame of the SIROCCO project by the Consortium formed by ATOS Origin, CORYS Tess, for the Electricite de France (EDF). These instructor stations are installed on fifteen replica training simulators located on different sites throughout France for the purposes of improving the job-related training of the EDF PWR nuclear power plant operating teams. This covers all 900 MW and 1300MW nuclear power plant of EDF. The simulated control rooms are installed on maintenance platform located at EDF and the consortium facilities. The consortium uses it to maintain and upgrade the simulators. EDF uses it to validate the upgrade delivered by the consortium before on site installation and to perform engineering analysis. This presentation sets out successively: - The major advantages of the generic and configurable connected module concept for flexible and quick adaptation to different simulators; - The innovative functionalities of the advanced Instructor Desk (IS) which make the instructor's tasks of preparation, monitoring and postanalysis of a training session easier and more homogeneous; - The use of the Simulated Control Room (SCR) for training purposes but also for those of maintenance and design studies for upgrades of existing control rooms

  13. Magnetohydrodynamic power generation

    International Nuclear Information System (INIS)

    Sheindlin, A.E.; Jackson, W.D.; Brzozowski, W.S.; Rietjens, L.H.Th.

    1979-01-01

    The paper describes research and development in the field of magnetohydrodynamic power generation technology, based on discussions held in the Joint IAEA/UNESCO International Liaison Group on MHD electrical power generation. Research and development programmes on open cycle, closed cycle plasma and liquid-metal MHD are described. Open cycle MHD has now entered the engineering development stage. The paper reviews the results of cycle analyses and economic and environmental evaluations: substantial agreement has been reached on the expected overall performance and necessary component specifications. The achievement in the Soviet Union on the U-25 MHD pilot plant in obtaining full rated electrical power of 20.4 MW is described, as well as long duration testing of the integrated operation of MHD components. Work in the United States on coal-fired MHD generators has shown that, with slagging of the walls, a run time of about one hundred hours at the current density and electric field of a commercial MHD generator has been achieved. Progress obtained in closed cycle plasma and liquid metal MHD is reviewed. Electrical power densities of up to 140 MWe/m 3 and an enthalpy extraction as high as 24 per cent have been achieved in noble gas MHD generator experiments. (Auth.)

  14. Development of wind power generation in China

    International Nuclear Information System (INIS)

    Zhiquan, Y.; Yan, C.; Lijun, X.

    1995-01-01

    Present status and development of wind power generation in China is described in this paper. China is vast in territory with abundant wind resources. The exploitable wind energy in China is estimated up to 253,000 MW. At present, more than 150 thousand small WTGs of a total capacity of 17 MW are used to provide residential electricity uses in non-grid connected areas and 13 wind farms, with above 160 medium and large scale grid connected WTGs (50-500 kW) of a total capacity of 30 MW, have been constructed. At the same time, some progress has been made in the fields of nation-wide wind resource assessment, measurement technology of wind turbine performance, the assimilation of foreign wind turbine technology, grid connected WTG technology and the operation of wind farm etc. It is planned that the total installed capacity of WTGs will reach 1000 MW by the end of 2000. Wind power generation could be a part of electric power industry in China. (Author)

  15. Integrated operation and management system for a 700MW combined cycle power plant

    Energy Technology Data Exchange (ETDEWEB)

    Shiroumaru, I. (Yanai Power Plant Construction Office, Chugoku Electric Power Co., Inc., 1575-5 Yanai-Miyamoto-Shiohama, Yanai-shi, Yamaguchi-ken (JP)); Iwamiya, T. (Omika Works, Hitachi, Ltd., 5-2-1 Omika-cho, Hitachi-shi, Ibaraki-ken (JP)); Fukai, M. (Hitachi Works, Hitachi, Ltd., 3-1-1 Saiwai-cho, Hitachi-shi, Ibaraki-ken (JP))

    1992-03-01

    Yanai Power Plant of the Chugoku Electric Power Co., Inc. (Yamaguchi Pref., Japan) is in the process of constructing a 1400MW state-of-the-art combined cycle power plant. The first phase, a 350MW power plant, started operation on a commercial basis in November, 1990. This power plant has achieved high efficiency and high operability, major features of a combined cycle power plant. The integrated operation and management system of the power plant takes care of operation, maintenance, control of general business, etc., and was built using the latest computer and digital control and communication technologies. This paper reports that it is expected that this system will enhance efficient operation and management for the power plant.

  16. 200 MW S-band traveling wave resonant ring development at IHEP

    Science.gov (United States)

    Zhou, Zu-Sheng; Chi, Yun-Long; Git, Meng-Ping; Pei, Guo-Xi

    2010-03-01

    The resonant-ring is a traveling wave circuit, which is used to produce high peak power with comparatively smaller stored energy. The application to be considered is its use as a high power simulator mainly for testing the klystron ceramic output window, as well as for high power microwave transmission devices. This paper describes the principle of a resonant ring and introduces the structure and property of the newly constructed traveling wave resonant ring at IHEP. Our goal is to produce a 200 MW class resonant ring at 2.856 GHz with a pulse length of 2 μs and repetition rate of 25 Hz. The installation, commissioning and testing of the ring have been completed and a peak power of 200 MW at 3 μs has been achieved. The conditioning results show that all the parameters of the resonant ring reach the design goals.

  17. Status of the development of the EU 170 GHz/1 MW/CW gyrotron

    Energy Technology Data Exchange (ETDEWEB)

    Pagonakis, Ioannis Gr., E-mail: ioannis.pagonakis@kit.edu [Karlsruhe Institute of Technology (KIT), Karlsruhe (Germany); Albajar, Ferran [The European Joint Undertaking for ITER and The Development of Fusion Energy, Barcelona (Spain); Alberti, Stefano [École Polytechnique Fédérale de Lausanne, Centre de Recherches en Physique des Plasmas (CRPP), Lausanne (Switzerland); Avramidis, Konstantinos [Karlsruhe Institute of Technology (KIT), Karlsruhe (Germany); Bonicelli, Tullio [The European Joint Undertaking for ITER and The Development of Fusion Energy, Barcelona (Spain); Braunmueller, Falk [École Polytechnique Fédérale de Lausanne, Centre de Recherches en Physique des Plasmas (CRPP), Lausanne (Switzerland); Bruschi, Alex [Plasma Physics Institute, National Research Council of Italy, Milano (Italy); Chelis, Ioannis [School of Electrical and Computer Engineering, National Technical University of Athens (Greece); Cismondi, Fabio [The European Joint Undertaking for ITER and The Development of Fusion Energy, Barcelona (Spain); Gantenbein, Gerd [Karlsruhe Institute of Technology (KIT), Karlsruhe (Germany); Hermann, Virgile [Thales Electron Devices (TED), Vélizy-Villacoublay (France); Hesch, Klaus [Karlsruhe Institute of Technology (KIT), Karlsruhe (Germany); Hogge, Jean-Philippe [École Polytechnique Fédérale de Lausanne, Centre de Recherches en Physique des Plasmas (CRPP), Lausanne (Switzerland); Jelonnek, John; Jin, Jianbo; Illy, Stefan [Karlsruhe Institute of Technology (KIT), Karlsruhe (Germany); Ioannidis, Zisis C. [Faculty of Physics, National and Kapodistrian University of Athens (Greece); Kobarg, Thorsten [Karlsruhe Institute of Technology (KIT), Karlsruhe (Germany); and others

    2015-10-15

    The progress in the development of the European 170 GHz, 1 MW/CW gyrotron for electron cyclotron heating & current drive (ECH&CD) on ITER is reported. A continuous wave (CW) prototype is being manufactured by Thales Electron Devices (TED), France, while a short-pulse (SP) prototype gyrotron is in parallel under manufacture at Karlsruhe Institute of Technology (KIT), with the purpose of validating the design of the CW industrial prototype components. The fabrication of most of the sub-assemblies of the SP prototype has been completed. In a first step, an existing magnetron injection gun (MIG) available at KIT was used. Despite this non-ideal configuration, the experiments provided a validation of the design, substantiated by an excellent agreement with numerical simulations. The tube, operated without a depressed collector, is able to produce more than 1 MW of output power with efficiency in excess of 30%, as expected, and compatible with the ITER requirements.

  18. RF Behavior of Cylindrical Cavity Based 240 GHz, 1 MW Gyrotron for Future Tokamak System

    Science.gov (United States)

    Kumar, Nitin; Singh, Udaybir; Bera, Anirban; Sinha, A. K.

    2017-11-01

    In this paper, we present the RF behavior of conventional cylindrical interaction cavity for 240 GHz, 1 MW gyrotron for futuristic plasma fusion reactors. Very high-order TE mode is searched for this gyrotron to minimize the Ohmic wall loading at the interaction cavity. The mode selection process is carried out rigorously to analyze the mode competition and design feasibility. The cold cavity analysis and beam-wave interaction computation are carried out to finalize the cavity design. The detail parametric analyses for interaction cavity are performed in terms of mode stability, interaction efficiency and frequency. In addition, the design of triode type magnetron injection gun is also discussed. The electron beam parameters such as velocity ratio and velocity spread are optimized as per the requirement at interaction cavity. The design studies presented here confirm the realization of CW, 1 MW power at 240 GHz frequency at TE46,17 mode.

  19. A target-moderator-reflector concept of the JAERI 5 MW pulsed spallation neutron source

    International Nuclear Information System (INIS)

    Watanabe, Noboru; Teshigawara, Makoto; Aizawa, Kazuya; Suzuki, Jyunichi; Oyama, Yukio

    1998-03-01

    In Japan Atomic Energy Research Institute the construction of a 5 MW (short) pulsed spallation neutron source is under planning using a projected high power superconducting proton (or H - ) linac of 8 MW in total beam power. In the present paper we report our consideration on target-moderator-reflector concept, based on the layout of the tentative neutron instruments for the assumed neutron scattering experiments in future. The choice of cold neutron moderators for high resolution and high intensity experiments, thermal and epithermal neutron moderators for high resolution uses was discussed and a reference layout of target-moderator-reflector system was proposed for detailed neutronic calculation and optimization. The proposed system was designed like that it can provide, at least, 30 beam lines for more than 40 instruments. (author)

  20. Detailed Load Analysis of the baseline 5MW DeepWind Concept

    DEFF Research Database (Denmark)

    Verelst, David Robert; Aagaard Madsen, Helge; Kragh, Knud Abildgaard

    This report presents an overview of the design of the DeepWind vertical axis oating wind turbine. One could present this as the "nal design", however, it is hoped that more design iterations will follow in the future, but under the umbrella of new and dierent projects. The state of the design...... that is reported here will be called version 2.2.0. The numbering system has just been introduced at the present design version, but the rst 5MW design called the "baseline design" [1] was developed in 2011 and this will therefore be called version 1.0.0. In this report, the design loads of the DeepWind 5 MW...

  1. An opportunity for capacity up-rating of 1000 MW steam turbine plant in Kozloduy NPP

    International Nuclear Information System (INIS)

    Popov, D.

    2005-01-01

    In connection with earlier and forced decommissioning of the Kozloduy NPP units 1 - 4, an alternative has to be found in order to substitute these capacities. As a reasonable options, capacity up-rating of 1000 MW steam turbine plants without nuclear reactor thermal capacity increase, is investigated in the present study. The cooling water for these units is delivered by Danube river. The cooling water temperatures substantially decrease during the winter months. These changes create an opportunity for steam back end pressure reduction. It was found that when the cooling water temperature decreases from 15 0 C to 3 0 C, the steam back end pressure is on the decrease of from 3.92 kPa to 2.3 kPa. As a result capacity of the plant could be raised up to 50 MW without any substantial equipment and systems change

  2. Development of steady-state 2 MW, 170 GHz gyrotrons for ITER

    International Nuclear Information System (INIS)

    Piosczyk, B.; Arnold, A.; Thumm, M.; Dammertz, G.; Heidinger, R.; Illy, S.; Jin, J.; Koppenburg, K.; Leonhardt, W.; Neffe, G.; Rzesnicki, T.; Schmid, M.; Yang, X.; Alberti, S.; Chavan, R.; Fasel, D.; Goodman, T.; Henderson, M.; Hogge, J.P.; Tran, M.Q.; Yovchev, I.; Erckmann, V.; Laqua, H.P.; Michel, G.; Gantenbein, G.; Kasparek, W.; Mueller, G.; Schwoerer, K.; Bariou, D.; Beunas, A.; Giguet, E.; LeCloarec, G.; Legrand, F.; Lievin, C.; Dumbrajs, O.

    2005-01-01

    A prototype of a 1 MW, CW, 140 GHz conventional gyrotron for the W7-X stellarator in Greifswald/Germany has been tested successfully and the fabrication of series tubes started. In extended studies the feasibility for manufacturing a continuously operated high power coaxial cavity gyrotron has been demonstrated and all needed data for an industrial design has been obtained. Based on this results the fabrication of a first prototype of a 2 MW, CW, 170 GHz coaxial cavity gyrotron started recently in cooperation between European research institutions and European tube industry. The prototype tube is foreseen to be tested in 2006 at CRPP Lausanne where a suitable test facility is under construction. (author)

  3. MEGAPIE, a 1 MW pilot experiment for a liquid metal spallation target

    International Nuclear Information System (INIS)

    Bauer, G.S.; Salvatores, M.; Heusener, G.

    2001-01-01

    MEGAPIE (Megawatt Pilot Target Experiment) is an initiative launched by Commissariat a l'Energie Atomique, Cadarache (France) and Forschungszentrum Karlsruhe (Germany) in collaboration with Paul Scherrer Institut (Switzerland), to demonstrate, in an international collaboration, the feasibility of a liquid lead bismuth target for spallation facilities at a beam power level of 1 MW. Such a target is under consideration for various concepts of accelerator driven systems (ADS) to be used in transmutation of nuclear waste and other applications world-wide. It also has the potential of increasing significantly the thermal neutron flux available at the spallation neutron source (SINQ) for neutron scattering. SINQ's beam power being close to 1 MW already, this facility offers a unique opportunity to realize such an experiment with a reasonably small number of new ancillary systems. The paper describes the basic features of the experiment and its boundary conditions, the technical concept of the target and underlying research carried out at participating laboratories. (author)

  4. Experimental results for a 1.5 MW, 110 GHz gyrotron oscillator with reduced mode competition

    Science.gov (United States)

    Choi, E. M.; Marchewka, C. D.; Mastovsky, I.; Sirigiri, J. R.; Shapiro, M. A.; Temkin, R. J.

    2006-02-01

    A new result from a 110GHz gyrotron at MIT is reported with an output power of 1.67MW and an efficiency of 42% when operated at 97kV and 41A for 3μs pulses in the TE22,6 mode. These results are a major improvement over results obtained with an earlier cavity design, which produced 1.43MW of power at 37% efficiency. These new results were obtained using a cavity with a reduced output taper angle and a lower ohmic loss when compared with the earlier cavity. The improved operation is shown experimentally to be the result of reduced mode competition from the nearby TE19,7 mode. The reduced mode competition agrees well with an analysis of the startup scenario based on starting current simulations. The present results should prove useful in planning long pulse and CW versions of the 110GHz gyrotron.

  5. Experimental results for a 1.5 MW, 110 GHz gyrotron oscillator with reduced mode competition

    International Nuclear Information System (INIS)

    Choi, E.M.; Marchewka, C.D.; Mastovsky, I.; Sirigiri, J.R.; Shapiro, M.A.; Temkin, R.J.

    2006-01-01

    A new result from a 110 GHz gyrotron at MIT is reported with an output power of 1.67 MW and an efficiency of 42% when operated at 97 kV and 41 A for 3 μs pulses in the TE 22,6 mode. These results are a major improvement over results obtained with an earlier cavity design, which produced 1.43 MW of power at 37% efficiency. These new results were obtained using a cavity with a reduced output taper angle and a lower ohmic loss when compared with the earlier cavity. The improved operation is shown experimentally to be the result of reduced mode competition from the nearby TE 19,7 mode. The reduced mode competition agrees well with an analysis of the startup scenario based on starting current simulations. The present results should prove useful in planning long pulse and CW versions of the 110 GHz gyrotron

  6. Preliminary Design of a Multi-Column TLP Foundation for a 5-MW Offshore Wind Turbine

    OpenAIRE

    Yongsheng Zhao; Jianmin Yang; Yanping He

    2012-01-01

    Currently, floating wind turbines (FWTs) may be the more economical and suitable systems with which to exploit offshore wind energy in deep waters. Among the various types of floating foundations for offshore wind farms, a tension leg platform (TLP) foundation can provide a relatively stable platform for currently available offshore wind turbines without requiring major modifications. In this study, a new multi-column TLP foundation (WindStar TLP) was developed for the NREL 5-MW offshore wind...

  7. Management of a 600 MW CANDU project to facilitate electricity export

    International Nuclear Information System (INIS)

    Gunter, G.E.

    1983-06-01

    The export of electricity from 600-MW CANDU nuclear power plants built in Canada remains feasible providing certain requirements continue to be met. The principal objective in developing nuclear power resources for export is that they must produce economically attractive electricity. A review of the experience of construction and operation of Point Lepreau Unit 1 suggests an inherent ability to reduce construction costs and shorten construction schedules so as to make electrical power output from these stations even more attractive to export customers

  8. A strong-motion hot spot of the 2016 Meinong, Taiwan, earthquake (Mw = 6.4

    Directory of Open Access Journals (Sweden)

    Hiroo Kanamori

    2017-01-01

    Full Text Available Despite a moderate magnitude, Mw = 6.4, the 5 February 2016 Meinong, Taiwan, earthquake caused significant damage in Tainan City and the surrounding areas. Several seismograms display an impulsive S-wave velocity pulse with an amplitude of about 1 m s-1, which is similar to large S-wave pulses recorded for the past several larger damaging earthquakes, such as the 1995 Kobe, Japan, earthquake (Mw = 6.9 and the 1994 Northridge, California, earthquake (Mw = 6.7. The observed PGV in the Tainan area is about 10 times larger than the median PGV of Mw = 6.4 crustal earthquakes in Taiwan. We investigate the cause of the localized strong ground motions. The peak-to-peak ground-motion displacement at the basin sites near Tainan is about 35 times larger than that at a mountain site with a similar epicentral distance. At some frequency bands (0.9 - 1.1 Hz, the amplitude ratio is as large as 200. Using the focal mechanism of this earthquake, typical “soft” and “hard” crustal structures, and directivity inferred from the observed waveforms and the slip distribution, we show that the combined effect yields an amplitude ratio of 17 to 34. The larger amplitude ratios at higher frequency bands can be probably due to the effects of complex 3-D basin structures. The result indicates that even from a moderate event, if these effects simultaneously work together toward amplifying ground motions, the extremely large ground motions as observed in Tainan can occur. Such occurrences should be taken into consideration in hazard mitigation measures in the place with frequent moderate earthquakes.

  9. New results in development of MW output power gyrotrons for fusion systems

    International Nuclear Information System (INIS)

    Litvak, A.G.; Denisov, G.G.; Ilin, V.I.; Kurbatov, V.I.; Myasnikov, V.E.; Soluyanova, E.A.; Tai, E.M.; Usachev, S.V.; Zapevalov, V.E.

    2005-01-01

    The paper presents the latest achievements of the Russian gyrotron team in development of MW power gyrotrons for fusion installations. During two last years four new gyrotrons were designed and tested: a new version of 170 GHz gyrotron for ITER; multi-frequency (105-140 GHz) gyrotron for Asdex-Up, 84GHz gyrotron for LHD and 82.7 GHz gyrotron for SST-1. All these gyrotrons are equipped with diamond CVD windows and depressed collectors

  10. Radiological consequence analysis for upgradation of Pakistan Research Reactor-1 from 9 to 10 MW

    International Nuclear Information System (INIS)

    Khan, L.A.; Raza, S.S.

    1993-12-01

    Radiological consequence analysis has been carried out for upgradation of PARR-I from 9 to 10 MW. A hypothetical loss of coolant accident resulting in core meltdown and release of fission products to the atmosphere has been analyzed. Whole body and thyroid doses have been calculated as a function of time and distance from the containment building. Based on these dose estimates, boundaries of exclusion and low population zones are assessed. (author)

  11. Development of frequency step tunable 1 MW gyrotron at 131 to 146.5 GHz

    Energy Technology Data Exchange (ETDEWEB)

    Samartsev, A.; Gantenbein, G.; Dammertz, G.; Illy, S.; Kern, S.; Leonhardt, W.; Schlaich, A.; Schmid, M.; Thumm, M., E-mail: andrey.samartsev@kit.edu [Karlsruhe Institute of Technology, Association EURATOM-KIT, Karlsruhe (Germany)

    2011-07-01

    Effective control of power absorption in tokamaks and stellarators could be achieved by the frequency tuning of ECH and CD power delivered by high-power gyrotrons. In this report some results of the development of a frequency tunable gyrotron with fused-silica Brewster window are presented. Excitation of several modes at 1 MW power level in the range of frequencies from 131 to 146.5 GHz is achieved. (author)

  12. JPRS Report, Science & Technology, Europe & Latin America, Argentina: Specifications of ARGOS 380 MW Reactor.

    Science.gov (United States)

    1988-02-18

    and economy in operation. ENACE is an acronym for Empresa Nuclear Argentina de Centrales Electricas, or Argentine Nuclear Power Plant Corporation...products. The fuel transport system can be used during full reactor power operation to remove specially de - signed fuel assemblies containing rods for...SPECIFICATIONS OF ARGOS 380 MW REACTOR [Buenos Aires COMISION NACIONAL DE ENERGIA ATOMICA: INFORME in English 1987 pp 1-93] CONTENTS Argentine Offer of

  13. Analyses of hypothetical nuclear criticality excursions in 10- and 20-MW freezer/sublimer vessels

    International Nuclear Information System (INIS)

    Haught, C.F.; Jordan, W.C.; Basoglu, B.; Dodds, H.L.; Wilkinson, A.D.

    1995-01-01

    A theoretical model is used to predict the consequences of a postulated hypothetical nuclear criticality excursion in a freezer/sublimer (F/S). Previous work has shown that an intrusion of water into a F/S may result in a critical configuration. A first attempt is made to model the neutronic and thermal-hydraulic phenomena occurring during a criticality excursion involving both uranium hexafluoride (UF 6 ) and uranyl fluoride (UO 2 F 2 ) solution, which is present in the F/S during upset conditions. The model employs point neutronics coupled with simple thermal hydraulics. Reactivity feedback from changes in the properties of the system are included in the model. The excursion is studied in a 10-MW F/S with an initial load of 3,500 kg of 5% weight enriched UF 6 and in a 20-MW F/S with an initial load of 6,800 kg of 2% weight enriched UF 6 . The magnitude of the fission release determined in this work is 5.93 x 10 18 fissions in the 10-MW F/S and 4.21 x 10 18 fissions in the 20-MW F/S. In order to demonstrate the reliability of the techniques used in this work, a limited validation study was conducted by comparing the fission release and peak fission rate determined by this work with experimental results for a limited number of experiments. The agreement between calculations and experiments in the validation study is considered to be satisfactory. The calculational results for the hypothetical accidents in the two F/S vessels appear reasonable

  14. Safety report concerning Melusine (after power increase to 4 MW). Descriptive part. Volumes 1 and 2

    International Nuclear Information System (INIS)

    Baas, C.; Delcroix, V.; Jacquemain, M.; Marouby, R.; Meunier, C.; De Robien, E.; Rossillon, F.

    1967-03-01

    Construction of Melusine was started in January 1957, It first diverged on July 1, 1958. It operated at: 1 MW from March 1959; 1.4 MW from April 1960; 2 MW from September 1961; 4 MW from December 1965. Various modifications have been made since the reactor was built. They concern: - the addition of a hot cell. - the effluents: 2 reservoirs of 15 m 3 for liquid waste have been installed. The resin regeneration equipment has been completely modified. - the building: offices have been added - experimental zones have been set up in the hall - the electrical supply. - the cooling and purification circuits (installation of a second exchanger, replacement of the primary pumps, creation of a hot layer, etc... ). - the fuel elements (at the moment of the MTR type enriched to 90 per cent). - the swimming-pool (which has been partially equipped with a stainless steel coating). - the core (placing of 'stools', of a diving-board, etc...). - the ventilation: the hall has been de-pressurized during normal working in the event of an accident, the hall can be isolated and a safety circuit can be started up. A chimney has been installed. - the hall (which has been strengthened and sealed more effectively). - the control electronics (modification of the principle, and which are now entirely transistorized). So many changes have been made that the reactor now bears only a slight resemblance to the initial model. It has appeared necessary to make a brief review of these improvements in order to be able to judge more effectively the installations present safety characteristics; these latter are furthermore fairly well known as a result of the experiments carried out not only by the Thermal Transfer Service in Grenoble but also at Cadarache (Cabri) and Toulon (the work of Mr. PASCOUET). (authors) [fr

  15. Multimode harmonic power measurement of 40 MW pulsed S-band klystrons

    International Nuclear Information System (INIS)

    Fowkes, W.R.; Wu, E.S.

    1984-08-01

    An array of 12 calibrated RF electric field probes on the waveguide walls are used to sample the complex field profile at the second and third harmonics where the fundamental power is in the 40 MW range at 2856 MHx. The measured amplitude and phase signals from these are Fourier analyzed to determine with good accuracy the power in each of the many possible propagating modes

  16. Study on the shuffling scheme in HTR-10 MW test module

    International Nuclear Information System (INIS)

    Jing Xingqing; Zhang Xu; Luo Jingyu

    1993-01-01

    The shuffling ways, once through then out and multiple through then out, in HTR-10 MW Test Module are studied. Multiple through then out is better than once through with regard to rational use of the fuel and flattening the power. The behaviour of equilibrium core and loss of coolant accident is analyzed. The results indicate that characteristic features of the multiple through then out could be better to satisfy the demands of safety criterions

  17. Performance evaluation of 10 MW grid connected solar photovoltaic power plant in India

    OpenAIRE

    B. Shiva Kumar; K. Sudhakar

    2015-01-01

    The growing energy demand in developing nations has triggered the issue of energy security. This has made essential to utilize the untapped potential of renewable resources. Grid connected PV systems have become the best alternatives in renewable energy at large scale. Performance analysis of these grid connected plants could help in designing, operating and maintenance of new grid connected systems. A 10 MW photovoltaic grid connected power plant commissioned at Ramagundam is one of the larg...

  18. Increase of the competition on the electric power french market: 6000 MW for the concurrence

    International Nuclear Information System (INIS)

    2001-01-01

    In the framework of the energy market deregulation in France, EDF became wedded to three objectives: encourage the competition in France, contribute to the development of a unique energy market in Europe and and allowed the EDF group development in the same conditions of the concurrence. In this mind, EDF put 6000 MW for auction. An economic analysis of the EDF group policy facing the competition of the new energy de-regulated market is proposed. (A.L.B.)

  19. Large scale experiments with a 5 MW sodium/air heat exchanger for decay heat removal

    International Nuclear Information System (INIS)

    Stehle, H.; Damm, G.; Jansing, W.

    1994-01-01

    Sodium experiments in the large scale test facility ILONA were performed to demonstrate proper operation of a passive decay heat removal system for LMFBRs based on pure natural convection flow. Temperature and flow distributions on the sodium and the air side of a 5 MW sodium/air heat exchanger in a natural draught stack were measured during steady state and transient operation in good agreement with calculations using a two dimensional computer code ATTICA/DIANA. (orig.)

  20. Power for southern Italy: hvdc Sardinia to mainland 200 MW scheme now commissioned

    Energy Technology Data Exchange (ETDEWEB)

    1967-02-16

    Transmission of the maximum rated power of 200 MW over the hvdc system which now links Sardinia with the Italian Mainland marks the successful completion of a notable British Export contract by English Electric. The link was commissioned on February 1. The Sardinia scheme is the seventh hvdc scheme to be completed in the world and is the first to be engineered by submarine cable.

  1. Investigation of techniques for the application of safeguards to the CANDU 600 MW(e) nuclear generating station

    International Nuclear Information System (INIS)

    Smythe, W.D.

    1978-06-01

    A cooperative program with the Canadian Atomic Energy Control Board, Atomic Energy of Canada Limited and the IAEA was established in 1975: to determine the diversion possibilities at the CANDU type reactors using a diversion path analysis; to detect the diversion of nuclear materials using material accountancy and surveillance/containment. Specific techniques and instrumentation, some of which are unique to the CANDU reactor, were developed. 10 appendices bring together the relevant reports and memoranda of results for the Douglas Point Program

  2. Intermediate heat exchanger design study of 25 MW straight-tube hexagonal modular type

    International Nuclear Information System (INIS)

    Okamoto, Masaharu; Tanaka, Toshiyuki

    1983-09-01

    The helium-to-helium Intermediate Heat Exchanger(IHX), straight-tube hexagonal modular type was designed at General Atomic Company(GA), which heat duty is 421 MW. For this type IHX, at the selection of basic design, emphasis is placed on cost reduction and size reduction. Then small diameter tube size(11.1 mm), with wall thickness of 1.2 mm is applied to this IHX, necessary for the compact surface geometry. The other side, the helical-tube type IHX was designed at JAERI, which heat duty is 25 MW. This paper discusses the referance design of 25 MW scale IHX, with GA type application. The basic feature of this type IHX is as follows. (1) Thermal stress is reduced, as a result of using small diameter and thin wall thickness tube. (2) The possible improvements can make for higher heat flux, because of short length tube, compare with helical or U-tube type. (3) The simple tube support can use compare with helical or U-tube type. The conclusion reached is that GA type IHX is about one forth compactness and one forth weight compare with helical tube IHX. (author)

  3. Race-track coils for a 3 MW HTS ship motor

    Energy Technology Data Exchange (ETDEWEB)

    Ueno, E., E-mail: ueno-eisaku@sei.co.jp; Kato, T.; Hayashi, K.

    2014-09-15

    Highlights: • Sumitomo Electric manufactured the HTS field coils for a 3 MW HTS ship motor. • The motor was developed and successfully passed the loading test by Kawasaki Heavy. • We tested and obtained the basic data to evaluate the 20-year durability of coils. - Abstract: Since the discovery of high-temperature superconductivity (HTS), Sumitomo Electric has been developing silver-sheathed Bi2223 superconducting wire and products. Ship propulsion motors are one of the most promising applications of HTS. Sumitomo Electric Industries, Ltd. (SEI) has recently manufactured 24 large racetrack coils, using 70 km long DI-BSCCO wires, for use in a 3 MW HTS motor developed by Kawasaki Heavy Industries, Ltd. (KHI). The 3 MW HTS motor, using our newly developed racetrack coils, has successfully passed the loading test. It is particularly important that the HTS field coils used in ship propulsion motors can withstand the expansive forces repeatedly applied to them. As racetrack type coils have straight sections, the support mechanism they require to withstand expansive forces is very different from that of circular coils. Therefore, we ran tests and obtained the basic data to evaluate the 20-year durability of racetrack coils against the repeatedly applied expansive forces expected in domestic ship propulsion motors.

  4. Research on Operation and Control Strategy of 600MW PWR in Load Follow

    Energy Technology Data Exchange (ETDEWEB)

    Qu, Bing Yang; Cao, Xin Rong [Harbin Engineering University, Harbin (China); Li, Han Chen [China Nuclear Power Engineering Co., Beijing (China)

    2014-08-15

    600MW Pressurized Water Reactor (PWR) is designed to operate in Constant Axial Offset Control (CAOC) strategy with base load originally. By calculations over a typical load follow scenario '12-3-6-3 {sup (}100-50-100%FP) via the CASMO-4E and SIMULATE-3 package, values of core operating parameter have been examined. With the progress of the nuclear power industry, advanced reactors are considered to have a good performance in load follow, economy and flexibility. Under the premise of fuel loading and structural dimensions unchanged, two independent control rod groups M and AO are used in 600MW pressurized water reactor to provide fine control of both the core reactivity and axial power distribution, which is named ' Improved G strategy .' The influences of different control rod distributions, composition materials, and overlap steps had in power changes have been examined in a comparative study to choose the optimal one.Then we simulate a range of load follow scenarios of the redesigned 600MW core without adjusting soluble boron concentration in the begin, middle and end of first cycle. This paper additionally demonstrated the moderator temperature coefficient and shutdown margin values of the reactor in Improved G strategy to compare with the thermal safety design criteria. It's demonstrated that adequate adjustment of control rod groups enable the core to perform load follow through Improved G strategy in 80% of cycle and save a large volume of liquid effluent particularly toward the end of cycle.

  5. Study on Actuator Line Modeling of Two NREL 5-MW Wind Turbine Wakes

    Directory of Open Access Journals (Sweden)

    Ziying Yu

    2018-03-01

    Full Text Available The wind turbine wakes impact the efficiency and lifespan of the wind farm. Therefore, to improve the wind plant performance, research on wind plant control is essential. The actuator line model (ALM is proposed to simulate the wind turbine efficiently. This research investigates the National Renewable Energy Laboratory 5 Million Watts (NREL 5-MW wind turbine wakes with Open Field Operation and Manipulation (OpenFOAM using ALM. Firstly, a single NREL 5-MW turbine is simulated. The comparison of the power and thrust with Fatigue, Aerodynamics, Structures, and Turbulence (FAST shows a good agreement below the rated wind speed. The information relating to wind turbine wakes is given in detail. The top working status is proved at the wind speed of 8 m/s and the downstream distance of more than 5 rotor diameters (5D. Secondly, another case with two NREL 5-MW wind turbines aligned is also carried out, in which 7D is validated as the optimum distance between the two turbines. The result also shows that the upstream wind turbine has an obvious influence on the downstream one.

  6. Development of a field pole of 1 MW-class HTS motor

    International Nuclear Information System (INIS)

    Yuan, S; Kimura, Y; Miki, M; Felder, B; Tsuzuki, K; Izumi, M; Ida, T; Umemoto, K; Aizawa, K; Yokoyama, M

    2010-01-01

    We report a field-pole high-temperature superconductor (HTS) magnet designed for 1 MW-class motor for propulsion. The field pole is assembled to the rotor of the radial-type motor. Each field pole is composed of HTS-Bi2223 tape wound into coils which have been piled up as a double pancake coils. In the design concept of the motor, we employ field poles without iron core. We prepared the test field-pole coil, whose dimension is smaller than the designed one for 1 MW, and tested its performances after cooling under self-field and external magnetic field. We verified the operation with the minimum bend radius of the coils required in the motor design, while keeping an optimal current which is lower than the critical current of the field-pole coil. The test HTS field poles were successfully cooled down and operated under a magnetic field ranging up to 5 T. We report the results of the test field-pole coil and the manufacture of a practical racetrack coil with Bi2223 and discuss the adaptability to 1 MW-class motors.

  7. Long pulse characteristics of 5 MW ion source for SST-1 neutral beam injector

    Energy Technology Data Exchange (ETDEWEB)

    Jana, M.R. [Institute for Plasma Research, Bhat, Gandhinagar 382428 (India)], E-mail: mukti@ipr.res.in; Mattoo, S.K.; Chakraborty, A.K.; Baruah, U.K.; Patel, G.B.; Jayakumar, P.K. [Institute for Plasma Research, Bhat, Gandhinagar 382428 (India)

    2008-10-15

    We present characteristics of a 5 MW ion source for SST-1 neutral beam injector. Before the source could be tested for its performance, it was conditioned by 480 arc discharges of 1 s and beam extraction of hydrogen species at various beam voltages ranging between 19 kV and 56 kV. Breakdown free beam extraction could be secured only after about 3000 beam second extraction. The ion source is capable of delivering 1.7 MW of neutral beam power at 55 kV with horizontal and vertical focal length of 5.4 m and 7 m respectively. Beam divergence is {approx}0.97 deg. Steady-state beam energy of 31 MJ at 41 kV was achieved during 14 s long beam extraction. We have not noticed any deterioration of beam parameters, including beam divergence during long pulse operation. These results indicate that 0.5 MW of neutral beam power at 30 kV required for heating of plasma in SST-1 can be delivered.

  8. Long pulse characteristics of 5 MW ion source for SST-1 neutral beam injector

    International Nuclear Information System (INIS)

    Jana, M.R.; Mattoo, S.K.; Chakraborty, A.K.; Baruah, U.K.; Patel, G.B.; Jayakumar, P.K.

    2008-01-01

    We present characteristics of a 5 MW ion source for SST-1 neutral beam injector. Before the source could be tested for its performance, it was conditioned by 480 arc discharges of 1 s and beam extraction of hydrogen species at various beam voltages ranging between 19 kV and 56 kV. Breakdown free beam extraction could be secured only after about 3000 beam second extraction. The ion source is capable of delivering 1.7 MW of neutral beam power at 55 kV with horizontal and vertical focal length of 5.4 m and 7 m respectively. Beam divergence is ∼0.97 deg. Steady-state beam energy of 31 MJ at 41 kV was achieved during 14 s long beam extraction. We have not noticed any deterioration of beam parameters, including beam divergence during long pulse operation. These results indicate that 0.5 MW of neutral beam power at 30 kV required for heating of plasma in SST-1 can be delivered.

  9. Thermal Hydraulics Analysis for the 3MW TRIGA MARK-II Research Reactor Under Transient Condition

    International Nuclear Information System (INIS)

    Huda, M.Q.; Bhuiyan, S.I.; Mondal, M.A.W.

    1996-12-01

    Some important thermal hydraulic parameters of the 3 MW TRIGA MARK-II research reactor operating under transient condition were investigated using two computer codes PULTRI and TEMPUL. Major transient parameters, such as, peak power and prompt energy released after pulse, maximum fuel and coolant temperature, surface heat flux, time and radial distribution of temperature within fuel element after pulse, fuel, fuel-cladding gap width variation, etc. were computer and compared with the experimental and operational values as reported in the safety Analysis Report (SAR). It was observed that pulsing of the reactor inserting an excess reactivity of $2.00 shoots the reactor power level to 854.353 MW compared to an experimental value of 852 MW; the maximum fuel temperature corresponding to this peak power was found to be 846.76 o C which is much less than the limiting maximum value of fuel temperature of 1150 0 C as reported in SAR. During a pulse if the film boiling occurs for a peak adiabatic fuel temperature of 1000 o C, the calculated outer cladding wall temperature was observed to be 702.39 0 C compared to a value of 760 o C reported in SAR under the same condition. The investigated other results were also found to be in good agreement with the values reported in the SAR. 16 refs., 22 figs. (author)

  10. Towards a 1 MW, 170 GHz gyrotron design for fusion application

    Science.gov (United States)

    Kumar, Anil; Kumar, Nitin; Singh, Udaybir; Bhattacharya, Ranajoy; Yadav, Vivek; Sinha, A. K.

    2013-03-01

    The electrical design of different components of 1 MW, 170 GHz gyrotron such as, magnetron injection gun, cylindrical interaction cavity and collector and RF window is presented in this article. Recently, a new project related to the development of 170 GHz, 1 MW gyrotron has been started for the Indian Tokamak. TE34,10 mode is selected as the operating mode after studied the problem of mode competition. The triode type geometry is selected for the design of magnetron injection gun (MIG) to achieve the required beam parameters. The maximum transverse velocity spread of 3.28% at the velocity ratio of 1.34 is obtained in simulations for a 40 A, 80 kV electron beam. The RF output power of more than 1 MW with 36.5% interaction efficiency without depressed collector is predicted by simulation in single-mode operation at 170 GHz frequency. The simulated single-stage depressed collector of the gyrotron predicted the overall device efficiencies >55%. Due to the very good thermal conductivity and very weak dependency of the dielectric parameters on temperature, PACVD diamond is selected for window design for the transmission of RF power. The in-house developed code MIGSYN and GCOMS are used for initial geometry design of MIG and mode selection respectively. Commercially available simulation tools MAGIC and ANSYS are used for beam-wave interaction and mechanical analysis respectively.

  11. Development of a field pole of 1 MW-class HTS motor

    Science.gov (United States)

    Yuan, S.; Kimura, Y.; Miki, M.; Felder, B.; Tsuzuki, K.; Ida, T.; Izumi, M.; Umemoto, K.; Aizawa, K.; Yokoyama, M.

    2010-06-01

    We report a field-pole high-temperature superconductor (HTS) magnet designed for 1 MW-class motor for propulsion. The field pole is assembled to the rotor of the radial-type motor. Each field pole is composed of HTS-Bi2223 tape wound into coils which have been piled up as a double pancake coils. In the design concept of the motor, we employ field poles without iron core. We prepared the test field-pole coil, whose dimension is smaller than the designed one for 1 MW, and tested its performances after cooling under self-field and external magnetic field. We verified the operation with the minimum bend radius of the coils required in the motor design, while keeping an optimal current which is lower than the critical current of the field-pole coil. The test HTS field poles were successfully cooled down and operated under a magnetic field ranging up to 5 T. We report the results of the test field-pole coil and the manufacture of a practical racetrack coil with Bi2223 and discuss the adaptability to 1 MW-class motors.

  12. Generators for gearless wind energy converters

    Energy Technology Data Exchange (ETDEWEB)

    Grauers, A. [Chalmers Univ. of Technology, Goeteborg (Sweden). Dept. of Electric Power Engineering

    1996-12-01

    This paper discusses some design alternatives for directly driven generators, and one specific generator type is investigated for a wide range of rated power. First, the specification for a directly driven generator is presented, then different design alternatives are discussed. A radial-flux permanent magnet generator for frequency converter connection has been chosen for a more detailed investigation. The design, optimization and performance of that generator type are presented. Generators from 30 kW to 3 MW are designed and compared with conventional four-pole generators with gear. It is found that a directly driven generator can be more efficient than a conventional generator and gear and have a rather small diameter and a low active weight. 8 refs, 7 figs, 2 tabs

  13. NOK's 1 MW solar chain - Standardised data for the period 1992 - 2000; 1-MW-Solarkette der NOK. Normierte Daten 1992 - 2000

    Energy Technology Data Exchange (ETDEWEB)

    Roth, S.

    2002-07-01

    This report for the Swiss Federal Office of Energy (SFOE) presents the results of detailed measurements and analyses made for the assessment of the long-term operational behaviour of grid-connected photovoltaic (PV) systems. The data from eight different PV installations with powers ranging from 2.5 to 100 kW{sub p}, mounted on roofs, facades and even on trackers, that were collected between 1992 and 2000 are presented. All energy and performance values are standardised to the guidelines of the European Solar Test Installation (ESTI) in Ispra, Italy. The report contains all detailed data for all the PV plant monitored within the framework of the 1 MW Solar Chain project. In order to secure continuity of the monitoring during the whole lifetimes of the installations, the author suggests the launching of a follow-up measurement project.

  14. The Chiloé Mw 7.6 earthquake of 2016 December 25 in Southern Chile and its relation to the Mw 9.5 1960 Valdivia earthquake

    Science.gov (United States)

    Lange, Dietrich; Ruiz, Javier; Carrasco, Sebastián; Manríquez, Paula

    2018-04-01

    On 2016 December 25, an Mw 7.6 earthquake broke a portion of the Southern Chilean subduction zone south of Chiloé Island, located in the central part of the Mw 9.5 1960 Valdivia earthquake. This region is characterized by repeated earthquakes in 1960 and historical times with very sparse interseismic activity due to the subduction of a young (˜15 Ma), and therefore hot, oceanic plate. We estimate the coseismic slip distribution based on a kinematic finite-fault source model, and through joint inversion of teleseismic body waves and strong motion data. The coseismic slip model yields a total seismic moment of 3.94 × 1020 N.m that occurred over ˜30 s, with the rupture propagating mainly downdip, reaching a peak slip of ˜4.2 m. Regional moment tensor inversion of stronger aftershocks reveals thrust type faulting at depths of the plate interface. The fore- and aftershock seismicity is mostly related to the subduction interface with sparse seismicity in the overriding crust. The 2016 Chiloé event broke a region with increased locking and most likely broke an asperity of the 1960 earthquake. The updip limit of the main event, aftershocks, foreshocks and interseismic activity are spatially similar, located ˜15 km offshore and parallel to Chiloé Islands west coast. The coseismic slip model of the 2016 Chiloé earthquake suggests a peak slip of 4.2 m that locally exceeds the 3.38 m slip deficit that has accumulated since 1960. Therefore, the 2016 Chiloé earthquake possibly released strain that has built up prior to the 1960 Valdivia earthquake.

  15. Postseismic deformation following the 2010 Mw 8.8 Maule and 2014 Mw 8.1 Pisagua megathrust earthquakes in Chile

    Science.gov (United States)

    Weiss, J. R.; Saunders, A.; Qiu, Q.; Foster, J. H.; Gomez, D.; Bevis, M. G.; Smalley, R., Jr.; Cimbaro, S.; Lenzano, L. E.; Barón, J.; Baez, J. C.; Echalar, A.; Avery, J.; Wright, T. J.

    2017-12-01

    We use a large regional network of continuous GPS sites to investigate postseismic deformation following the Mw 8.8 Maule and Mw 8.1 Pisagua earthquakes in Chile. Geodetic observations of surface displacements associated with megathrust earthquakes aid our understanding of the subduction zone earthquake cycle including postseismic processes such as afterslip and viscoelastic relaxation. The observations also help place constraints on the rheology and structure of the crust and upper mantle. We first empirically model the data and find that, while single-term logarithmic functions adequately fit the postseismic timeseries, they do a poor job of characterizing the rapid displacements in the days to weeks following the earthquakes. Combined exponential-logarithmic functions better capture the inferred near-field transition between afterslip and viscous relaxation, however displacements are best fit by three-term exponential functions with characteristic decay times of 15, 250, and 1500 days. Viscoelastic modeling of the velocity field and timeseries following the Maule earthquake suggests that the rheology is complex but is consistent with a 100-km-thick asthenosphere channel of viscosity 1018 Pa s sandwiched between a 40-km-thick elastic lid and a strong viscoelastic upper mantle. Variations in lid thickness of up to 40 km may be present and in some locations rapid deformation within the first months to years following the Maule event requires an even lower effective viscosity or a significant contribution from afterslip. We investigate this further by jointly inverting the GPS data for the time evolution of afterslip and viscous flow in the mantle wedge surrounding the Maule event.

  16. Co-seismic deformation of the August 27, 2012 Mw 7.3 El Salvador and September 5, 2012 Mw 7.6 Costa Rica earthquakes

    Science.gov (United States)

    Geirsson, H.; La Femina, P. C.; DeMets, C.; Mattioli, G. S.; Hernández, D.

    2013-05-01

    We investigate the co-seismic deformation of two significant earthquakes that occurred along the Middle America trench in 2012. The August 27 Mw 7.3 El Salvador and September 5 Mw 7.6 Nicoya Peninsula, Costa Rica earthquakes, were examined using a combination of episodic and continuous Global Positioning System (GPS) data. USGS finite fault models based on seismic data predict fundamentally different characteristics for the two ruptures. The El Salvador event occurred in a historical seismic gap and on the shallow segment of the Middle America Trench main thrust, rupturing a large area, but with a low magnitude of slip. A small tsunami was observed along the coast in Nicaragua and El Salvador, additionally indicating near-trench rupture. Conversely, the Nicoya, Costa Rica earthquake was predicted to have an order of magnitude higher slip on a spatially smaller patch deeper on the main thrust. We present results from episodic and continuous geodetic GPS measurements made in conjunction with the two earthquakes, including data from newly installed COCONet (Continuously Operating Caribbean GPS Observational Network) sites. Episodic GPS measurements made in El Salvador, Honduras, and Nicaragua following the earthquakes, allow us to estimate the co-seismic deformation field from both earthquakes. Because of the small magnitude of the El Salvador earthquake and its shallow rupture the observed co-seismic deformation is small (earthquake occurred directly beneath a seismic and geodetic network specifically designed to capture such events. The observed displacements exceeded 0.5 m and there is a significant post-seismic transient following the earthquake. We use our estimated co-seismic offsets for both earthquakes to model the magnitude and spatial variability of slip for these two events.

  17. Nuclear power generation

    International Nuclear Information System (INIS)

    Hirao, Katumi; Sato, Akira; Kaimori, Kimihiro; Kumano, Tetsuji

    2001-01-01

    Nuclear power generation for commercial use in Japan has passed 35 years since beginning of operation in the Tokai Nuclear Power Station in 1966, and has 51 machines of reactor and about 44.92 MW of total output of equipment scale in the 21st century. However, an environment around nuclear energy becomes severer at present, and then so many subjects to be overcome are remained such as increased unreliability of the public on nuclear energy at a chance of critical accident of the JCO uranium processing facility, delay of pull-thermal plan, requirement for power generation cost down against liberalization of electric power, highly aging countermeasure of power plant begun its operation as its Genesis, and so on. Under such conditions, in order that nuclear power generation in Japan survives as one of basic electric source in future, it is necessary not only to pursue safety and reliability of the plant reliable to the public, but also to intend to upgrade its operation and maintenance by positively adopting good examples on operational management method on abroad and to endeavor further upgrading of application ratio of equipments and reduction of generation cost. Here were outlined on operation conditions of nuclear power stations in Japan, and introduced on upgrading of their operational management and maintenance management. (G.K.)

  18. Teleseismic and regional data analysis for estimating depth, mechanism and rupture process of the 3 April 2017 MW 6.5 Botswana earthquake and its aftershock (5 April 2017, MW 4.5)

    Science.gov (United States)

    Letort, J.; Guilhem Trilla, A.; Ford, S. R.; Sèbe, O.; Causse, M.; Cotton, F.; Campillo, M.; Letort, G.

    2017-12-01

    We constrain the source, depth, and rupture process of the Botswana earthquake of April 3, 2017, as well as its largest aftershock (5 April 2017, Mw 4.5). This earthquake is the largest recorded event (Mw 6.5) in the East African rift system since 1970, making one important case study to better understand source processes in stable continental regions. For the two events an automatic cepstrum analysis (Letort et al., 2015) is first applied on respectively 215 and 219 teleseismic records, in order to detect depth phase arrivals (pP, sP) in the P-coda. Coherent detections of depth phases for different azimuths allow us to estimate the hypocentral depths respectively at 28 and 23 km, suggesting that the events are located in the lower crust. A same cepstrum analysis is conducted on five other earthquakes with mb>4 in this area (from 2002 to 2017), and confirms a deep crustal seismicity cluster (around 20-30 km). The source mechanisms are then characterized using a joint inversion method by fitting both regional long-period surface-waves and teleseismic high-frequency body-waves. Combining regional and teleseismic data (as well as systematic comparisons between theoretical and observed regional surface-waves dispersion curves prior to the inversion) allows us to decrease epistemic uncertainties due to lack of regional data and poor knowledge about the local velocity structure. Focal mechanisms are both constrained as normal faulting with a northwest trending, and hypocentral depths are confirmed at 28 and 24 km. Finally, in order to study the mainshock rupture process, we originally apply a kymograph analysis method (an image processing method, commonly used in the field of cell biology for identifying motions of molecular motors, e.g. Mangeol et al., 2016). Here, the kymograph allows us to better identify high-frequency teleseismic P-arrivals inside the P-coda by tracking both reflected depth phase and direct P-wave arrivals radiated from secondary sources during the

  19. Virtual Generation (Energy Efficiency) The Cheapest Source For Power Generation

    Energy Technology Data Exchange (ETDEWEB)

    Hasnie, Sohail

    2010-09-15

    Energy efficiency is the cheapest source of energy that has escaped the minds of the politicians in the developing countries. This paper argues for large scale utility led end use efficiency programs in a new paradigm, where 1 million efficient light bulbs is synonymous to a 50 MW power station that costs only 2% of the traditional fossil fuel power station and zero maintenance. Bulk procurement, setting up new standards and generation of certified emissions reduction is part of this strategy. It discusses implementation of a $20 million pilot in the Philippines supported by the Asian Development Bank.

  20. The 2014, MW6.9 North Aegean earthquake: seismic and geodetic evidence for coseismic slip on persistent asperities

    Science.gov (United States)

    Konca, Ali Ozgun; Cetin, Seda; Karabulut, Hayrullah; Reilinger, Robert; Dogan, Ugur; Ergintav, Semih; Cakir, Ziyadin; Tari, Ergin

    2018-05-01

    We report that asperities with the highest coseismic slip in the 2014 MW6.9 North Aegean earthquake persisted through the interseismic, coseismic and immediate post-seismic periods. We use GPS and seismic data to obtain the source model of the 2014 earthquake, which is located on the western extension of the North Anatolian Fault (NAF). The earthquake ruptured a bilateral, 90 km strike-slip fault with three slip patches: one asperity located west of the hypocentre and two to the east with a rupture duration of 40 s. Relocated pre-earthquake seismicity and aftershocks show that zones with significant coseismic slip were relatively quiet during both the 7 yr of interseismic and the 3-month aftershock periods, while the surrounding regions generated significant seismicity during both the interseismic and post-seismic periods. We interpret the unusually long fault length and source duration, and distribution of pre- and post-main-shock seismicity as evidence for a rupture of asperities that persisted through strain accumulation and coseismic strain release in a partially coupled fault zone. We further suggest that the association of seismicity with fault creep may characterize the adjacent Izmit, Marmara Sea and Saros segments of the NAF. Similar behaviour has been reported for sections of the San Andreas Fault, and some large subduction zones, suggesting that the association of seismicity with creeping fault segments and rapid relocking of asperities may characterize many large earthquake faults.

  1. The Impact of Power Switching Devices on the Thermal Performance of a 10 MW Wind Power NPC Converter

    Directory of Open Access Journals (Sweden)

    Ke Ma

    2012-07-01

    Full Text Available Power semiconductor switching devices play an important role in the performance of high power wind energy generation systems. The state-of-the-art device choices in the wind power application as reported in the industry include IGBT modules, IGBT press-pack and IGCT press-pack. Because of significant deviation in the packaging structure, electrical characteristics, as well as thermal impedance, these available power switching devices may have various thermal cycling behaviors, which will lead to converter solutions with very different cost, size and reliability performance. As a result, this paper aimed to investigate the thermal related characteristics of some important power switching devices. Their impact on the thermal cycling of a 10 MW three-level Neutral-Point-Clamped wind power converter is then evaluated under various operating conditions; the main focus will be on the grid connected inverter. It is concluded that the thermal performances of the 3L-NPC wind power converter can be significantly changed by the power device technology as well as their parallel configurations.

  2. Design of two-DMD based zoom MW and LW dual-band IRSP using pixel fusion

    Science.gov (United States)

    Pan, Yue; Xu, Xiping; Qiao, Yang

    2018-06-01

    In order to test the anti-jamming ability of mid-wave infrared (MWIR) and long-wave infrared (LWIR) dual-band imaging system, a zoom mid-wave (MW) and long-wave (LW) dual-band infrared scene projector (IRSP) based on two-digital micro-mirror device (DMD) was designed by using a projection method of pixel fusion. Two illumination systems, which illuminate the two DMDs directly with Kohler telecentric beam respectively, were combined with projection system by a spatial layout way. The distances of projection entrance pupil and illumination exit pupil were also analyzed separately. MWIR and LWIR virtual scenes were generated respectively by two DMDs and fused by a dichroic beam combiner (DBC), resulting in two radiation distributions in projected image. The optical performance of each component was evaluated by ray tracing simulations. Apparent temperature and image contrast were demonstrated by imaging experiments. On the basis of test and simulation results, the aberrations of optical system were well corrected, and the quality of projected image meets test requirements.

  3. The ShakeOut scenario: A hypothetical Mw7.8 earthquake on the Southern San Andreas Fault

    Science.gov (United States)

    Porter, K.; Jones, L.; Cox, D.; Goltz, J.; Hudnut, K.; Mileti, D.; Perry, S.; Ponti, D.; Reichle, M.; Rose, A.Z.; Scawthorn, C.R.; Seligson, H.A.; Shoaf, K.I.; Treiman, J.; Wein, A.

    2011-01-01

    In 2008, an earthquake-planning scenario document was released by the U.S. Geological Survey (USGS) and California Geological Survey that hypothesizes the occurrence and effects of a Mw7.8 earthquake on the southern San Andreas Fault. It was created by more than 300 scientists and engineers. Fault offsets reach 13 m and up to 8 m at lifeline crossings. Physics-based modeling was used to generate maps of shaking intensity, with peak ground velocities of 3 m/sec near the fault and exceeding 0.5 m/sec over 10,000 km2. A custom HAZUS??MH analysis and 18 special studies were performed to characterize the effects of the earthquake on the built environment. The scenario posits 1,800 deaths and 53,000 injuries requiring emergency room care. Approximately 1,600 fires are ignited, resulting in the destruction of 200 million square feet of the building stock, the equivalent of 133,000 single-family homes. Fire contributes $87 billion in property and business interruption loss, out of the total $191 billion in economic loss, with most of the rest coming from shakerelated building and content damage ($46 billion) and business interruption loss from water outages ($24 billion). Emergency response activities are depicted in detail, in an innovative grid showing activities versus time, a new format introduced in this study. ?? 2011, Earthquake Engineering Research Institute.

  4. Modeling and performance simulation of 100 MW PTC based solar thermal power plant in Udaipur India

    Directory of Open Access Journals (Sweden)

    Deepak Bishoyi

    2017-09-01

    Full Text Available Solar energy is a key renewable energy source and the most abundant energy source on the globe. Solar energy can be converted into electric energy by using two different processes: by means of photovoltaic (PV conversion and the thermodynamic cycles. Concentrated solar power (CSP is viewed as one of the most promising alternatives in the field of solar energy utilization. Lifetime and efficiency of PV system are very less compared to the CSP technology. A 100 MW parabolic trough solar thermal power plant with 6 h of thermal energy storage has been evaluated in terms of design and thermal performance, based on the System Advisor Model (SAM. A location receiving an annual DNI of 2248.17 kW h/m2 in Rajasthan is chosen for the technical feasibility of hypothetical CSP plant. The plant design consists of 194 solar collector loops with each loop comprising of 8 parabolic trough collectors. HITEC solar salt is chosen as an HTF due to its excellent thermodynamic properties. The designed plant can generate annual electricity of 285,288,352 kW h with the plant efficiency of 21%. The proposed design of PTC based solar thermal power plant and its performance analysis encourages further innovation and development of solar thermal power plants in India.

  5. Analysis of ionospheric vertical total electron content before the 1 April 2014 Mw 8.2 Chile earthquake

    Science.gov (United States)

    Jiang, Weiping; Ma, Yifang; Zhou, Xiaohui; Li, Zhao; An, Xiangdong; Wang, Kaihua

    2017-11-01

    This paper studies ionospheric vertical total electron content (VTEC) variations before the 1 April 2014 Mw 8.2 Chile earthquake. VTEC derived from 14 global positioning system (GPS) stations and global ionospheric map (GIM) were used to analyze ionospheric variations before the earthquake using the sliding interquartile range method, and the results showed that significant positive VTEC anomalies occurred on 28 March. To explore possible causes of these anomalies, effects of solar and geomagnetic activities were examined, and VTEC variations during 17 March to 31 March in 2009-2013 were cross-compared. Also, VTEC for a full year before the earthquake was investigated. The results indicated that the anomalies were weakly associated with high solar activities and geomagnetic storms and that the anomalies were not normal seasonal and diurnal variations. An analysis of the spatial distribution of the observed anomalies was also presented, and it demonstrated that the anomalies specifically appeared around the epicenter on 28 March. We suggest that the observed anomalies may be associated with the subsequent Chile earthquake. Equatorial anomaly variations were analyzed to discuss the possible physical mechanism, and results showed that the equatorial anomaly unusually increased on 28 March, which indicates that anomalous electric fields generated in the earthquake preparation area and the meridional wind are possible causes of the observed ionospheric anomalies.

  6. Multi-MW Spallation Neutron Sources: Current Challenges and Future Prospects, 16th, 17th and 18th March 2009 in Bilbao (Spain)

    International Nuclear Information System (INIS)

    2009-01-01

    The strategy of building a multi MW, accelerator based spallation neutron source as the next generation neutron facility for Europe has been validated by the successful commissioning and operation of the SNS in the US (now operating close to 1 MW beam power) and the JPARC facility in Japan. However, since the original baseline design of ESS was completed in 2002, the underlying technology has advanced and some considerable experience has been gathered from these new facilities. Hence as Europe prepares for the construction of ESS, the time is ripe to learn from ongoing experience and define the development areas which would allow the ESS to take the most advantage from recent advances in technology while maintaining a reliable, low risk, design. The goal of the workshop, organized by the ESS Bilbao consortium, was to assess the current challenges facing multi-MW spallation sources and, taking into account synergies with other international projects of a similar nature, outline a road map for a collaborative Research and Development program that would enable Europe to meet these challenges for the timely construction of ESS. The full reports and recommendations from the various working groups are provided in the following pages. They lay the foundation for a road map for a collaborative development program which will enable the ESS to take full advantage of the relevant expertise which is distributed across various facilities and countries within Europe to produce a truly European facility at the forefront of the technology. This report is a witness to the willingness of a great many people to share their experiences and knowledge in an open and cooperative environment. (Author)

  7. Radiological Protection and Nuclear Engineering Studies in Multi-MW Target Systems

    Science.gov (United States)

    Luis, Raul Fernandes

    Several innovative projects involving nuclear technology have emerged around the world in recent years, for applications such as spallation neutron sources, accelerator-driven systems for the transmutation of nuclear waste and radioactive ion beam (RIB) production. While the available neutron Wuxes from nuclear reactors did not increase substantially in intensity over the past three decades, the intensities of neutron sources produced in spallation targets have increased steadily, and should continue to do so during the 21st century. Innovative projects like ESS, MYRRHA and EURISOL lie at the forefront of the ongoing pursuit for increasingly bright neutron sources; driven by proton beams with energies up to 2 GeV and intensities up to several mA, the construction of their proposed facilities involves complex Nuclear Technology and Radiological Protection design studies executed by multidisciplinary teams of scientists and engineers from diUerent branches of Science. The intense neutron Wuxes foreseen for those facilities can be used in several scientiVc research Velds, such as Nuclear Physics and Astrophysics, Medicine and Materials Science. In this work, the target systems of two facilitites for the production of RIBs using the Isotope Separation On-Line (ISOL) method were studied in detail: ISOLDE, operating at CERN since 1967, and EURISOL, the next-generation ISOL facility to be built in Europe. For the EURISOL multi-MW target station, a detailed study of Radiological Protection was carried out using the Monte Carlo code FLUKA. Simulations were done to assess neutron Wuences, Vssion rates, ambient dose equivalent rates during operation and after shutdown and the production of radioactive nuclei in the targets and surrounding materials. DiUerent materials were discussed for diUerent components of the target system, aiming at improving its neutronics performance while keeping the residual activities resulting from material activation as low as possible. The second

  8. CATHARE simulation of transients for the 2400 MW gas fast reactor concept

    International Nuclear Information System (INIS)

    Bentivoglio, Fabrice; Messie, Anne; Geffraye, Genevieve; Malo, Jean-Yves; Bertrand, Frederic; Plancq, David

    2009-01-01

    The Gas cooled Fast Reactor (GFR) is one of the six reactor concepts selected in the framework of the Generation IV forum and a high priority in the French Commissariat a l'Energie Atomique (CEA) R and D program on the Future Nuclear Energy Systems. A first design of this GFR2400 reactor has been completed by the CEA at the end of year 2005. The main characteristics of the concept are a 2400MW core based on plate type fuel elements, with an inlet temperature of 400degC and an outlet temperature of 850degC. The power conversion system is based on an indirect combined cycle with helium on the primary circuit, a Brayton cycle with a mixture of nitrogen and helium on the secondary circuit and a steam cycle on the tertiary circuit. In accidental situations, the use of the gas coolant circulation as the main way to remove the decay heat has been selected. A specific system (DHR system) has been designed: it consists of three loops (3 * 100% redundancy) in extension of the pressure vessel, equipped with heat exchangers and blowers. Between 2006 and 2007 a pre-conceptual study has been achieve, leading to the CEA milestone project of the 'GFR viability' at the end of year 2007. In the frame of this milestone, a wide range of CATHARE2 transients has been achieved to consolidate and improve the decay heat removal strategy; in particular the DHR blowers working on a large pressure range and the use of natural convection as a second way to remove decay heat. The paper first presents the CATHARE2 code applied to gas cooled reactor, focusing on the dedicated features included in the standard option of the code in order to obtain a multi-fluid reliable and performing tool. Then the modeling of the GFR2400 is presented, including the core, the vessel, the primary and secondary circuit with the turbo-machine, and a simplified tertiary circuit with boundary conditions. The decay heat removal loops (DHR loop) are also modeled, with a first circuit in helium and a secondary circuit in

  9. Operating experiences and utilization programmes of the BAEC 3 MW TRIGA Mark-II research reactor of Bangladesh

    International Nuclear Information System (INIS)

    Haque, M.M.; Soner, M.A.M.; Saha, P.K.; Salam, M.A.; Zulquarnain, M.A.

    2008-01-01

    The 3 MW TRIGA Mark-II research reactor of Bangladesh Atomic Energy Commission (BAEC) has been operating since September 14, 1986. The reactor is used for radioisotope production ( 131 I, 99m Tc, 46 Sc), various R and D activities, manpower training and education. The reactor has been operated successfully since its commissioning with the exception of a few reportable incidents. Of these, the decay tank leakage incident of 1997 is considered to be the most significant one. As a result of this incident, reactor operation at full power remained suspended for about 4 years. However, the reactor operation was continued during this period at a power level of 250 kW to cater the needs of various R and D groups, which required lower neutron flux for their experiments. This was made possible by establishing a temporary by pass connection across the decay tank using local technology. The reactor was made operational again at full power after successful replacement of the damaged decay tank in August 2001. At that time, several modifications of the reactor cooling system along with its associated structures were also implemented and then necessary testing and commissioning of the newly installed component/equipment were carried out. The other incident was the contamination of the Dry Central Thimble (DCT) that took place in March 2002 when a pyrex vial containing 50g of TeO 2 powder got melted inside the DCT. The vial was melted due to high heat generation on its surface while the reactor was operated for 8 hours at 3 MW for trial production of Iodine-131 ( 131 I). A Wet Central Thimble (WCT) was used to replace the damaged DCT in June 2002 such that the reactor operation could be resumed. The WCT was again replaced by a new DCT in June 2003 such that radioisotope production could be continued. The facility has so far been used to train up a total of 27 personnel including several foreign nationals to the level of Senior Reactor Operator (SRO) and Reactor Operator (RO). The

  10. Real-Time Dynamic Simulation of Korean Power Grid for Frequency Regulation Control by MW Battery Energy Storage System

    Directory of Open Access Journals (Sweden)

    Tae-Hwan Jin

    2016-12-01

    Full Text Available The aim of this study was to develop a real-time dynamic simulator of a power grid with power plant and battery model. The simulator was used to investigate the frequency control characteristics of a megawatt-scale high-capacity energy storage system connected to the electric power grid. In this study, a lithium-ion secondary battery was chosen as one of the batteries for a grid-connected model. The dynamics of the model was analysed in both steady and transient states. The frequency control system of the battery model plays a role in regulating the grid frequency by controlling the power of energy storage systems according to process variables and grid frequencies. The power grid model based on the current power network of South Korea, included power plants, substations and power demands. The power supply is classified by the type of turbine generator as thermal, nuclear, hydro power, pumped power storage, combined power plants, and batteries, including high-capacity energy storage systems rated for a maximum of 500 MW. This study deals with an installed capacity of 87.17 GW and peak load of 77.30 GW in the Korean power grid. For 24 hours of operation, the maximum and minimum power outputs were simulated as 61.59 GW and 46.32 GW, respectively. The commercialized real-time dynamic simulation software ProTRAX was used. The simulation was conducted to observe the operation characteristics of the frequency control system during a breakdown of power plants, as well as under governor-free operation, auto generation control operation, and with the battery energy storage system connected. The results show that the model is valid for each power plant breakdown simulation. They also confirm that the output power and frequency controls of the battery operated well during simulations.

  11. Important conventional island design features: generators

    International Nuclear Information System (INIS)

    Fritsch, Th.

    1985-01-01

    To-day, maximum reactor capacity is setting a provisional limit to the MW race. The latest nuclear generators in manufacturing are rated 1530 MW - 1710 MVA and are doubtless the most powerful ones in the world. The target to be aimed at in designing large turbogenerators may be defined by the following points: 1) meeting the rated load conditions without overpassing maximum admissible temperatures in any part of the machine; 2) keeping losses as small as possible; 3) keeping overall size small enough to allow rail transportation from the works to the site; 4) choosing well experienced solutions in order to set a highly reliable machine with maximum maintenance. In this report the main features of nuclear generators in the 1000-2000 MVA range are described. (Auth.)

  12. The multi-interlock and check of logical system for 5 MW low power reactor automatic rod

    International Nuclear Information System (INIS)

    Li Guangjian; Zhao Zengqiao

    1992-01-01

    The safety and reliability of the logical system for 5 MW LPR automatic rod are improved, because of using multi-interlock and manual check on line. The design character and function of the logical system are introduced

  13. The co-generation file

    International Nuclear Information System (INIS)

    Signoret, Stephane; Petitot, Pauline; Mary, Olivier; Sredojevic, Alexandre

    2017-01-01

    Whereas co-generation has many benefits (increase of energy efficiency, decrease of greenhouse gas emissions, job creation, integration of renewable energies, local and efficient production of heat and electricity, and so on), as explained in a first article, it has not enough public support in France any longer, notably for installations of more than 1 MW. However, as shown in some examples (a power and heat plant in Aulnay-sous-Bois, a factory in Graulhet), some co-generation installations have been able to take some benefit from the situation in 2015. Besides, some technological development are addressed: new burners to comply with regulations regarding NO_x and CO emissions, new engines able to operate with various gases such as hydrogen or gas produced by biomass gasification. A last article presents a co-generation boiler installed in a medical care home near Roye in the Somme district

  14. Steam generator waterlancing at DNGS

    International Nuclear Information System (INIS)

    Seppala, D.; Malaugh, J.

    1995-01-01

    Darlington Nuclear Generating Station (DNGS) is a four 900 MW Unit nuclear station forming part of the Ontario Hydro East System. There are four identical steam generators(SGs) per reactor unit. The Darlington SGs are vertical heat exchangers with an inverted U-tube bundle in a cylindrical shell. The DNGS Nuclear Plant Life Assurance Group , a department of DNGS Engineering Services have taken a Proactive Approach to ensure long term SG integrity. Instead of waiting until the tubesheets are covered by a substantial and established hard deposit; DNGS plan to clean each steam generator's tubesheet, first half lattice tube support assembly and bottom of the thermal plate every four years. The ten year business plan provides for cleaning and inspection to be conducted on all four SGs in each unit during maintenance outages (currently scheduled for every four years)

  15. Structural capacity assessment of WWER-1000 MW reactor containment. Progress report

    International Nuclear Information System (INIS)

    Jordanov, M.

    1999-01-01

    The objective of the project is to provide assessment of the structural behaviour and safety capacity of the WWER-1000 MW Reactor Building Containment at Kozloduy NPP under critical combination of loads according to the current international requirements. The analysis is focused on a realistic assessment of the Containment taking into account the non-linear shell behaviour of the pre-stressed reinforced concrete structure. Previous assessments of the status of pre stressing cables pointed out that the efficiency of the Containment as a final defence barrier for internal and external events depends on their reliability. Due to this, the experimental data obtained from embedded sensors (gauges) at pre-stressed shell structure is to be compared with the results from analytical investigations. The reliability of the WWER-1000 MW accident prevention system is under evaluation in the project. The Soviet standard design WWER-1000 MW type units installed in Kozloduy NPP were originally designed for a Safe Shutdown Earthquake (SSE) with a peak ground acceleration (PGA) of 0.1g. The new site seismicity studies revealed that the seismic hazard for the site significantly exceeds the originally estimated and a Review Level Earthquake (RLE) anchored to PGA=0.20g was proposed for re-assessment of the structures and equipment at Kozloduy NPP. The scope of the study is a re-assessment of the Containment structure under critical combination of loads according to the current safety and reliability requirements, including comparison between the Russian design requirements and the international regulations. Additionally, an investigation of the pre-stressing technology and the annual control of the cables' pre-stressing of the Containment is to be made. The crane influence on the dynamic behaviour of the Containment will be done as well as a study of the integrity of the Containment as a final defence barrier

  16. Exergy analysis of a 1000 MW double reheat ultra-supercritical power plant

    International Nuclear Information System (INIS)

    Si, Ningning; Zhao, Zhigang; Su, Sheng; Han, Pengshuai; Sun, Zhijun; Xu, Jun; Cui, Xiaoning; Hu, Song; Wang, Yi; Jiang, Long; Zhou, Yingbiao; Chen, Gang; Xiang, Jun

    2017-01-01

    Highlights: • Set up a simple and effective method to analysis the performance of double reheat USC unit. • Exergy loss distribution of the double reheat USC unit was declared. • The sensitivity variations of the unit’s exergy efficiency has been revealed. • Provide the foundation for the operation optimization of double reheat USC unit. - Abstract: This study evaluates the performance of a 1000 MW double reheat ultra-supercritical power plant. An exergy analysis was performed to direct the energy loss distribution of this system. Based on the exergy balance equation, together with exergy efficiency, exergy loss coefficient, and exergy loss rate, the exergy distribution and efficiency of the unit were determined. Results show that the highest exergy loss in furnace is as high as 85%, which caused by the combustion of fuel and heat exchange of water wall. The VHP and the two LPs suffer the highest exergy losses, namely 1.86%, 2.04% and 2.13% respectively. The regenerative heating system has an exergy loss rate of 2.3%. The condenser suffers a heat loss of 999 MW, but its exergy is as low as 20.49 MW. The sensitivity variations of the unit’s exergy efficiency with load, feedwater temperature, main steam temperature and pressure, the twice reheat steam temperatures, and steam exhaust pressure were also analyzed, indicating that load, feedwater temperature, and steam exhaust pressure influence the exergy efficiency of this unit than other elements. The overall exergy efficiency decreases along with the gradual increase of steam exhaust pressure at any constant outlet boiler temperature, but it increases as the load, feedwater temperature, main steam temperature and pressure, and twice reheat steam temperatures increase at fixed steam exhaust pressure.

  17. Multifractal analysis of 2001 Mw 7 . 7 Bhuj earthquake sequence in Gujarat, Western India

    Science.gov (United States)

    Aggarwal, Sandeep Kumar; Pastén, Denisse; Khan, Prosanta Kumar

    2017-12-01

    The 2001 Mw 7 . 7 Bhuj mainshock seismic sequence in the Kachchh area, occurring during 2001 to 2012, has been analyzed using mono-fractal and multi-fractal dimension spectrum analysis technique. This region was characterized by frequent moderate shocks of Mw ≥ 5 . 0 for more than a decade since the occurrence of 2001 Bhuj earthquake. The present study is therefore important for precursory analysis using this sequence. The selected long-sequence has been investigated first time for completeness magnitude Mc 3.0 using the maximum curvature method. Multi-fractal Dq spectrum (Dq ∼ q) analysis was carried out using effective window-length of 200 earthquakes with a moving window of 20 events overlapped by 180 events. The robustness of the analysis has been tested by considering the magnitude completeness correction term of 0.2 to Mc 3.0 as Mc 3.2 and we have tested the error in the calculus of Dq for each magnitude threshold. On the other hand, the stability of the analysis has been investigated down to the minimum magnitude of Mw ≥ 2 . 6 in the sequence. The analysis shows the multi-fractal dimension spectrum Dq decreases with increasing of clustering of events with time before a moderate magnitude earthquake in the sequence, which alternatively accounts for non-randomness in the spatial distribution of epicenters and its self-organized criticality. Similar behavior is ubiquitous elsewhere around the globe, and warns for proximity of a damaging seismic event in an area. OS: Please confirm math roman or italics in abs.

  18. A 10-GeV, 5-MW proton source for a pulsed spallation source

    International Nuclear Information System (INIS)

    Cho, Y.; Chae, Y.C.; Crosbie, E.

    1995-01-01

    A feasibility study for a pulsed spallation source based on a 5-MW, 10-GeV rapid proton synchrotron (RCS) is in progress. The integrated concept and performance parameters of the facility are discussed. The 10-GeV synchrotron uses as its injector the 2-GeV accelerator system of a 1-MW source described elsewhere. The 1-MW source accelerator system consists of a 400-MeV H - linac with 2.5 MeV energy spread in the 75% chopped (25% removed) beam and a 30-Hz RCS that accelerates the 400-MeV beam to 2 GeV. The time averaged current of the accelerator system is 0.5 mA, equivalent to 1.04 x 10 14 protons per pulse. The 10-GeV RCS accepts the 2 GeV beam and accelerates it to 10 GeV. Beam transfer from the 2-GeV synchrotron to the 10-GeV machine u highly efficient bunch-to-bucket injection, so that the transfer can be made without beam loss. The synchrotron lattice uses FODO cells of 90 degrees phase advance. Dispersion-free straight sections are obtained using a missing magnet scheme. The synchrotron magnets are powered by dual-frequency resonant circuits. The magnets are excited at a 20-Hz rate and de-excited at 60-Hz. resulting in an effective 30-Hz rate. A key feature of the design of this accelerator system is that beam losses are minimized from injection to extraction, reducing activation to levels consistent with hands-on maintenance. Details of the study are presented

  19. Neutron flux measurement in the central channel (XC-1) of TRIGA 14 MW LEU core

    International Nuclear Information System (INIS)

    BARBOS, D.; BUSUIOC, P.; ROTH, Cs.; PAUNOIU, C.

    2008-01-01

    The TRIGA 14 MW reactor, operated by Institute for Nuclear Research Pitesti, Romania, is a pool type reactor, and has a rectangular shape which holds fuel bundles and is surrounded with beryllium reflectors. Each fuel bundle is composed of 25 nuclear fuel rods. The TRIGA 14 MW reactor was commissioned 28 years ago with HEU fuel rods. The conversion was gradually achieved, starting in February 1992 and completed in March 2006. The full conversion of the 14 MW TRIGA Research Reactor was completed in May 2006 and each step of the conversion was achieved by removal of HEU fuel, replaced by LEU fuel, accompanied by a large set of theoretical evaluation and physical measurements intended to confirm the performances of gradual conversion. After the core full conversion, a program of measurements and comparisons with previous results of core physics and measurements is underway, allowing data acquisition for normal operation, demonstration of safety and economics of the converted core. Neutron flux spectrum measurements in the XC in the XC-1 water 1 water-filled channel were performed using multi multi-foil activation techniques. The neutron spectra and flux are obtained by unfolding from measured reaction rates using SAND II computer code. The integral neutron flux value for LEU core is greater of 13% than for the standard HEU core. Also thermal neutron flux value for converted LEU core is smaller by 0.38% than for the standard HEU core. These differences appear because the foil activation detectors have been irradiated using a pneumatic rabbit having a diameter of 32 mm, whereas foil irradiations in standard HEU core has been performed with a pneumatic rabbit having a diameter of 14 mm, and therefore the neutron spectra in LEU core is less thermalized and the weight of fast neutron is greater

  20. Cancer risks related to low-level RF/MW exposures, including cell phones.

    Science.gov (United States)

    Szmigielski, Stanislaw

    2013-09-01

    For years, radiofrequency (RF) and microwave (MW) radiations have been applied in the modern world. The rapidly increasing use of cellular phones called recent attention to the possible health risks of RF/MW exposures. In 2011, a group of international experts organized by IARC (International Agency for Research on Cancer in Lyon) concluded that RF/MW radiations should be listed as a possible carcinogen (group 2B) for humans. Three meta-analyses of case-control studies have concluded that using cell phones for more than ten years was associated with an increase in the overall risk of developing a brain tumor. The Interphone Study, the largest health-related case-control international study of use of cell phones and head and neck tumors, showed no statistically significant increases in brain cancers related to higher amounts of cell phone use, but excess risk in a small subgroup of more heavily exposed users associated with latency and laterality was reported. So far, the published studies do not show that mobile phones could for sure increase the risk of cancer. This conclusion is based on the lack of a solid biological mechanism, and the fact that brain cancer rates are not going up significantly. However, all of the studies so far have weaknesses, which make it impossible to entirely rule out a risk. Mobile phones are still a new technology and there is little evidence about effects of long-term use. For this reason, bioelectromagnetic experts advise application of a precautionary resources. It suggests that if people want to use a cell phone, they can choose to minimize their exposure by keeping calls short and preferably using hand-held sets. It also advises discouraging children from making non essential calls as well as also keeping their calls short.