WorldWideScience

Sample records for mw wellhead generator

  1. Wellhead with non-ferromagnetic materials

    Energy Technology Data Exchange (ETDEWEB)

    Hinson, Richard A [Houston, TX; Vinegar, Harold J [Bellaire, TX

    2009-05-19

    Wellheads for coupling to a heater located in a wellbore in a subsurface formation are described herein. At least one wellhead may include a heater located in a wellbore in a subsurface formation; and a wellhead coupled to the heater. The wellhead may be configured to electrically couple the heater to one or more surface electrical components. The wellhead may include at least one non-ferromagnetic material such that ferromagnetic effects are inhibited in the wellhead. Systems and methods for using such wellheads for treating a subsurface formation are described herein.

  2. Wellhead compression

    Energy Technology Data Exchange (ETDEWEB)

    Harrington, Joe [Sertco Industries, Inc., Okemah, OK (United States); Vazquez, Daniel [Hoerbiger Service Latin America Inc., Deerfield Beach, FL (United States); Jacobs, Denis Richard [Hoerbiger do Brasil Industria de Equipamentos, Cajamar, SP (Brazil)

    2012-07-01

    Over time, all wells experience a natural decline in oil and gas production. In gas wells, the major problems are liquid loading and low downhole differential pressures which negatively impact total gas production. As a form of artificial lift, wellhead compressors help reduce the tubing pressure resulting in gas velocities above the critical velocity needed to surface water, oil and condensate regaining lost production and increasing recoverable reserves. Best results come from reservoirs with high porosity, high permeability, high initial flow rates, low decline rates and high total cumulative production. In oil wells, excessive annulus gas pressure tends to inhibit both oil and gas production. Wellhead compression packages can provide a cost effective solution to these problems by reducing the system pressure in the tubing or annulus, allowing for an immediate increase in production rates. Wells furthest from the gathering compressor typically benefit the most from wellhead compression due to system pressure drops. Downstream compressors also benefit from higher suction pressures reducing overall compression horsepower requirements. Special care must be taken in selecting the best equipment for these applications. The successful implementation of wellhead compression from an economical standpoint hinges on the testing, installation and operation of the equipment. Key challenges and suggested equipment features designed to combat those challenges and successful case histories throughout Latin America are discussed below.(author)

  3. Wellhead bowl protector and retrieving tool

    International Nuclear Information System (INIS)

    Young, J.A.

    1991-01-01

    This patent describes improvement in a wellhead protection system including a wear bushing and a retrieving tool. The improvement comprises a wear bushing supported within the wellhead, wherein the wear bushing includes an enlarged upper end having an external support shoulder for engagement with an internal support shoulder formed in the wellhead; wherein the wear bushing further includes an internal circumferential slot intersected by at least one vertically extending slot, the vertical slot extending from the circumferential slot to the upper end of the wear bushing; a retrieving tool having at least one outwardly biased, retractable lug member mounted thereon; and wherein the retrieving tool includes an enlarged portion adapted to be received within the enlarged upper end of the wear bushing. This patent also describes a method of retrieving a wear bushing from a wellhead comprising the steps of: lowering a retrieving tool into the wellhead for locking engagement with the wear bushing; aligning the retrieving tool with the wear bushing for automatically forcing lug members carried by the retrieving tool outwardly into locking engagement with the wear bushing; monitoring drill string weight for determining engagement of the retrieving tool with the wear bushing, wherein a substantial decrease in drill string weight is an indication that the retrieving tool is engaged with the wear bushing; and removing the wear bushing from the wellhead

  4. Wellhead and tree standards updated

    International Nuclear Information System (INIS)

    Dach, A.J. Jr.; Haeberle, T.

    1996-01-01

    Revisions in the API 6A, 17th Edition, have resolved a number of long-term problems and expanded its scope and coverage of wellhead and christmas tree equipment. The 17th Edition, Feb. 1, 1996, represents the state-of-the-art in international requirements for wellhead and christmas tree equipment. The design, materials, and quality control aspects of API 6A have all been improved with an emphasis on making the document more acceptable around the world. However, there are unresolved issues that raise many questions about the future direction of efforts aimed at international standardization of wellhead and christmas tree equipment. Unfortunately, these unresolved issues confuse both manufacturers and companies purchasing this equipment. This ultimately increases wellhead and christmas tree costs, so it is to everyone's advantage to resolve these issues. This article describes the significant revisions that are included in API 6A, 17th Edition. Also discussed are the regulatory, standardization, and customer acceptance issues that cloud the future of API 6A, 17th Edition

  5. Lightweight MgB2 superconducting 10 MW wind generator

    Science.gov (United States)

    Marino, I.; Pujana, A.; Sarmiento, G.; Sanz, S.; Merino, J. M.; Tropeano, M.; Sun, J.; Canosa, T.

    2016-02-01

    The offshore wind market demands a higher power rate and more reliable turbines in order to optimize capital and operational costs. The state-of-the-art shows that both geared and direct-drive conventional generators are difficult to scale up to 10 MW and beyond due to their huge size and weight. Superconducting direct-drive wind generators are considered a promising solution to achieve lighter weight machines. This work presents an innovative 10 MW 8.1 rpm direct-drive partial superconducting generator using MgB2 wire for the field coils. It has a warm iron rotor configuration with the superconducting coils working at 20 K while the rotor core and the armature are at ambient temperature. A cooling system based on cryocoolers installed in the rotor extracts the heat from the superconducting coils by conduction. The generator's main parameters are compared against a permanent magnet reference machine, showing a significant weight and size reduction. The 10 MW superconducting generator concept will be experimentally validated with a small-scale magnetic machine, which has innovative components such as superconducting coils, modular cryostats and cooling systems, and will have similar size and characteristics as the 10 MW generator.

  6. 30 CFR 250.617 - Tubing and wellhead equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Tubing and wellhead equipment. 250.617 Section... Tubing and wellhead equipment. The lessee shall comply with the following requirements during well-workover operations with the tree removed: (a) No tubing string shall be placed in service or continue to...

  7. 30 CFR 250.517 - Tubing and wellhead equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Tubing and wellhead equipment. 250.517 Section... Tubing and wellhead equipment. (a) No tubing string shall be placed in service or continue to be used unless such tubing string has the necessary strength and pressure integrity and is otherwise suitable for...

  8. 30 CFR 250.1626 - Tubing and wellhead equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Tubing and wellhead equipment. 250.1626 Section... GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Sulphur Operations § 250.1626 Tubing and wellhead equipment. (a) No tubing string shall be placed into service or continue to be used unless such...

  9. Operating experiences with 1 MW steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Sano, A; Kanamori, A; Tsuchiya, T

    1975-07-01

    1 MW steam generator, which was planned as the first stage of steam generator development in Power Reactor and Nuclear Fuel Corp. (PNC) in Japan, is a single-unit, once-through, integrated shell and tube type with multi-helical coil tubes. It was completed in Oarai Engineering Center of PNC in March of 1971, and the various performance tests were carried out up to April, 1972. After the dismantle of the steam generator for structural inspection and material test, it was restored with some improvements. In this second 1 MW steam generator, small leak occurred twice during normal operation. After repairing the failure, the same kind of performance tests as the first steam generator were conducted in order to verify the thermal insulation effect of argon gas in downcomer zone from March to June, 1974. In this paper the above operating experiences were presented including the outline of some performance test results. (author)

  10. Lightweight MgB2 superconducting 10 MW wind generator

    International Nuclear Information System (INIS)

    Marino, I; Pujana, A; Sarmiento, G; Sanz, S; Merino, J M; Tropeano, M; Sun, J; Canosa, T

    2016-01-01

    The offshore wind market demands a higher power rate and more reliable turbines in order to optimize capital and operational costs. The state-of-the-art shows that both geared and direct-drive conventional generators are difficult to scale up to 10 MW and beyond due to their huge size and weight. Superconducting direct-drive wind generators are considered a promising solution to achieve lighter weight machines. This work presents an innovative 10 MW 8.1 rpm direct-drive partial superconducting generator using MgB 2 wire for the field coils. It has a warm iron rotor configuration with the superconducting coils working at 20 K while the rotor core and the armature are at ambient temperature. A cooling system based on cryocoolers installed in the rotor extracts the heat from the superconducting coils by conduction. The generator’s main parameters are compared against a permanent magnet reference machine, showing a significant weight and size reduction. The 10 MW superconducting generator concept will be experimentally validated with a small-scale magnetic machine, which has innovative components such as superconducting coils, modular cryostats and cooling systems, and will have similar size and characteristics as the 10 MW generator. (paper)

  11. External gamma radiation survey for oil wellheads in Saudi Arabia

    International Nuclear Information System (INIS)

    Nassar, Rafat M.; Mously, Khalid A.; Cowie, Michael I.

    2008-01-01

    Naturally occurring radioactive material (NORM) is known to be associated with oil and gas extraction. As part of a comprehensive NORM management strategy, Saudi Aramco needed to determine the extent of NORM contamination associated with their oil and gas operations. As part of that strategy, this study focused on external gamma survey of oil producing wellheads at various locations. The study aimed to: 1-) Identify wellheads with elevated gamma radiation dose rate; 2-) Specify the exact locations of the high dose rates on the wellheads; 3-) Identify the radioisotopes responsible for the high dose rates; and 4-) Propose worker protection requirements during maintenance. The majority (∼92%) of the surveyed wellheads showed no enhanced gamma dose-rate above background level. From the remaining ∼8%, only a few wellheads showed dose rates between 1,000-3,700 n Sv/h. The study revealed that NORM contamination tends to accumulate at turns of the pipes, around pipe diameter changes, the joints, the back of valves, and at the base of the wellhead. Also, for a given location, NORM build up on the interior of pipework varies over time and continues to migrate down stream until it reaches the Gas and Oil Separation Plants (GOSP). There NORM is expected to accumulate and reside in the form of sludge. Gamma spectroscopy analysis revealed that 226 Ra and its progeny are responsible for the high radiation dose rates detected. It was concluded that NORM will not pose significant radiation hazards to workers as long as the tubing and piping are not opened. (author)

  12. A 1500-MW(e) HTGR nuclear generating station

    International Nuclear Information System (INIS)

    Stinson, R.C.; Hornbuckle, J.D.; Wilson, W.H.

    1976-01-01

    A conceptual design of a 1500-MW(e) HTGR nuclear generating station is described. The design concept was developed under a three-party arrangement among General Atomic Company as nuclear steam supply system (NSSS) supplier, Bechtel Power Corporation as engineer-constructors of the balance of plant (BOP), and Southern California Edison Company as a potential utility user. A typical site in the lower Mojave Desert in southeastern California was assumed for the purpose of establishing the basic site criteria. Various alternative steam cycles, prestressed concrete reactor vessel (PCRV) and component arrangements, fuel-handling concepts, and BOP layouts were developed and investigated in a programme designed to lead to an economic plant design. The paper describes the NSSS and BOP designs, the general plant arrangement and a description of the site and its unique characteristics. The elements of the design are: the use of four steam generators that are twice the capacity of GA's steam generators for its 770-MW(e) and 1100-MW(e) units; the rearrangement of steam and feedwater piping and support within the PCRV; the elimination of the PCRV star foundation to reduce the overall height of the containment building as well as of the PCRV; a revised fuel-handling concept which permits the use of a simplified, grade-level fuel storage pool; a plant arrangement that permits a substantial reduction in the penetration structure around the containment while still minimizing the lengths of cable and piping runs; and the use of two tandem-compound turbine generators. Plant design bases are discussed, and events leading to the changes in concept from the reference 8-loop PCRV 1500-MW(e) HTGR unit are described. (author)

  13. GASCAP: Wellhead Gas Productive Capacity Model documentation, June 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The Wellhead Gas Productive Capacity Model (GASCAP) has been developed by EIA to provide a historical analysis of the monthly productive capacity of natural gas at the wellhead and a projection of monthly capacity for 2 years into the future. The impact of drilling, oil and gas price assumptions, and demand on gas productive capacity are examined. Both gas-well gas and oil-well gas are included. Oil-well gas productive capacity is estimated separately and then combined with the gas-well gas productive capacity. This documentation report provides a general overview of the GASCAP Model, describes the underlying data base, provides technical descriptions of the component models, diagrams the system and subsystem flow, describes the equations, and provides definitions and sources of all variables used in the system. This documentation report is provided to enable users of EIA projections generated by GASCAP to understand the underlying procedures used and to replicate the models and solutions. This report should be of particular interest to those in the Congress, Federal and State agencies, industry, and the academic community, who are concerned with the future availability of natural gas

  14. Simulating the effect of hydrate dissociation on wellhead stability during oil and gas development in deepwater

    Science.gov (United States)

    Li, Qingchao; Cheng, Yuanfang; Zhang, Huaiwen; Yan, Chuanliang; Liu, Yuwen

    2018-02-01

    It is well known that methane hydrate has been identified as an alternative resource due to its massive reserves and clean property. However, hydrate dissociation during oil and gas development (OGD) process in deep water can affect the stability of subsea equipment and formation. Currently, there is a serious lack of studies over quantitative assessment on the effects of hydrate dissociation on wellhead stability. In order to solve this problem, ABAQUS finite element software was used to develop a model and to evaluate the behavior of wellhead caused by hydrate dissociation. The factors that affect the wellhead stability include dissociation range, depth of hydrate formation and mechanical properties of dissociated hydrate region. Based on these, series of simulations were carried out to determine the wellhead displacement. The results revealed that, continuous dissociation of hydrate in homogeneous and isotropic formations can causes the non-linear increment in vertical displacement of wellhead. The displacement of wellhead showed good agreement with the settlement of overlying formations under the same conditions. In addition, the shallower and thicker hydrate formation can aggravate the influence of hydrate dissociation on the wellhead stability. Further, it was observed that with the declining elastic modulus and Poisson's ratio, the wellhead displacement increases. Hence, these findings not only confirm the effect of hydrate dissociation on the wellhead stability, but also lend support to the actions, such as cooling the drilling fluid, which can reduce the hydrate dissociation range and further make deepwater operations safer and more efficient.

  15. Design and operating experiences with 50MW steam generator

    International Nuclear Information System (INIS)

    Kawara, M.; Yamaki, H.; Kanamori, A.; Tanaka, K.; Takahashi, T.

    1975-01-01

    The main purpose of the 50 MW steam generator is to have experiences of manufacturing and operation with large scale steam generator including necessary research and development works which can be reflected on the design and fabrication of 'Monju' (Japan 300 MWe prototype LMFBR). The detailed design of the 50 MW steam, generator was begun on March, 1972 and succeeded in the demonstration of 72 hours continuous operation with full power on June, 1974. It has been successfully operated since then, the performances of which have been evaluated through various kinds of tests. In this paper, the following items are mainly discussed system design, thermal and hydraulic design, structure and fabrication and some experiences on testing operation including cleaning and sodium flushing of equipment, sodium level control system, the behavior of hydrogen detection system and general outlook of the performance. (author)

  16. Design and operating experiences with 50MW steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Kawara, M; Yamaki, H; Kanamori, A; Tanaka, K; Takahashi, T

    1975-07-01

    The main purpose of the 50 MW steam generator is to have experiences of manufacturing and operation with large scale steam generator including necessary research and development works which can be reflected on the design and fabrication of 'Monju' (Japan 300 MWe prototype LMFBR). The detailed design of the 50 MW steam, generator was begun on March, 1972 and succeeded in the demonstration of 72 hours continuous operation with full power on June, 1974. It has been successfully operated since then, the performances of which have been evaluated through various kinds of tests. In this paper, the following items are mainly discussed system design, thermal and hydraulic design, structure and fabrication and some experiences on testing operation including cleaning and sodium flushing of equipment, sodium level control system, the behavior of hydrogen detection system and general outlook of the performance. (author)

  17. Comparison of superconducting generators and permanent magnet generators for 10-MW direct-drive wind turbines

    DEFF Research Database (Denmark)

    Liu, Dong; Polinder, Henk; Abrahamsen, Asger Bech

    2016-01-01

    Large offshore direct-drive wind turbines of 10-MW power levels are being extensively proposed and studied because of a reduced cost of energy. Conventional permanent magnet generators currently dominating the direct-drive wind turbine market are still under consideration for such large wind...... turbines. In the meantime, superconducting generators (SCSGs) have been of particular interest to become a significant competitor because of their compactness and light weight. This paper compares the performance indicators of these two direct-drive generator types in the same 10-MW wind turbine under...... the same design and optimization method. Such comparisons will be interesting and insightful for commercialization of superconducting generators and for development of future wind energy industry, although SCSGs are still far from a high technology readiness level. The results show that the SCSGs may...

  18. New regulations foster wellhead protection efforts

    International Nuclear Information System (INIS)

    Lennox, J.

    1993-01-01

    Groundwater contamination can have disastrous consequences: closed wellfields, insufficient temporary water supplies, and costly, prolonged clean-up. Realizing that it is more prudent to protect water wells than to wait for contamination to occur, many states are issuing regulations designed to protect the surface and subsurface areas surrounding public water system wells. The states have been prompted in part by the federal Safe Drinking Water Act Amendments of 1986, which provide grants and technical guidance to state wellhead protection programs. The Act does not impose regulations itself, but leaves it to the states to create and manage protection programs. Accordingly, regulations may differ dramatically from state to state, reflecting distinct hydrogeology and land uses. In every program, however, the starting point is the determination of wellhead protection areas. The protection area can range from a few hundred feet to several miles from a well. The characteristics of the aquifers surrounding the well and the amount of pumping are factors in delineating the protected area's boundaries. This article examines methods for determining the protection area

  19. Feasibility study of 5MW superconducting wind turbine generator

    DEFF Research Database (Denmark)

    Abrahamsen, Asger Bech; Jensen, Bogi Bech; Seiler, E.

    2011-01-01

    The feasibility of installing a direct drive superconducting generator in the 5MW reference offshore wind turbine of the National Renewable Energy Laboratory (NREL) has been examined. The engineering current densities Je obtained in a series of race track coils have been combined with magnetization...... measurements to estimate the properties of suitable field coils for a synchronous generator, which is more light weight than the conventional used combination of a gear box and a fast rotating generator. An analytical model and finite element simulations have been used to estimate the active mass of generators...

  20. 5MW Direct Drive Wind Turbine Generator Design

    DEFF Research Database (Denmark)

    Zaidi, Arsalan; Senn, Lucile; Ortega, Iratxe

    2012-01-01

    A 5MW direct drive offshore wind turbine generator was studied and simulated using Vector Fields OPERA. This software allows calculation of the flux density, force, torque, and eddy currents in the machine at different rotor positions. Based on the data obtained from the model, initial assumptions...... for the suitable machine are listed and the modelling process presented. The model of the generator was improved by changing design parameters, e.g the position of the magnets or fitting additional I-Cores, and analyse the effect of it....

  1. Comparison of 10 MW superconducting generator topologies for direct-drive wind turbines

    DEFF Research Database (Denmark)

    Liu, Dong; Polinder, Henk; Abrahamsen, Asger Bech

    2015-01-01

    Large wind turbines of 10 MW or higher power levels are desirable for reducing the cost of energy of offshore wind power conversion. Conventional wind generator systems will be costly if scaled up to 10 MW due to rather large size and weight. Direct drive superconducting generators have been...... magnetic field excitation allows for lightweight non-magnetic composite materials for machine cores instead of iron. A topology would probably not be a good option for an offshore wind turbine generator if it demands a far more expensive active material cost than others, even if it has other advantages...... proposed to address the problem with generator size, because the electrical machines with superconducting windings are capable of achieving a higher torque density of an electrical machine. However, the topology to be adopted for superconducting wind generators has not yet been settled, since the high...

  2. Cost comparison of 4x500 MW coal-fuelled and 4x850 MW CANDU nuclear generating stations

    International Nuclear Information System (INIS)

    Costa, M.

    1981-01-01

    The lifetime costs for a 4x850 MW CANDU generating station are compared to those for 4x500 MW bituminous coal-fuelled generating stations. Two types of coal-fuelled stations are considered; one burning U.S. coal which includes flue gas desulfurization and one burning Western Canadian coal. Current estimates for the capital costs, operation and maintenance costs, fuel costs, decommissioning costs and irradiated fuel management costs are shown. The results show: (1) The accumulated discounted costs of nuclear generation, although initially higher, are lower than coal-fuelled generation after two or three years. (2) Fuel costs provide the major contribution to the total lifetime costs for coal-fuelled stations whereas capital costs are the major item for the nuclear station. (3) The break even lifetime capacity factor between nuclear and U.S. coal-fuelled generation is projected to be 5%; that for nuclear and Canadian coal-fuelled generation is projected to be 9%. (4) Large variations in the costs are required before the cost advantage of nuclear generation is lost. (5) Comparison with previous results shows that the nuclear alternative has a greater cost advantage in the current assessment. (6) The total unit energy cost remains approximately constant throughout the station life for nuclear generation while that for coal-fuelled generation increases significantly due to escalating fuel costs. The 1978 and 1979 actual total unit energy cost to the consumer for several Ontario Hydro stations are detailed, and projected total unit energy costs for several Ontario Hydro stations are shown in terms of escalated dollars and in 1980 constant dollars

  3. Synchronous Generator with HTS-2G field coils for Windmills with output power 1 MW

    Science.gov (United States)

    Kovalev, K.; Kovalev, L.; Poltavets, V.; Samsonovich, S.; Ilyasov, R.; Levin, A.; Surin, M.

    2014-05-01

    Nowadays synchronous generators for wind-mills are developed worldwide. The cost of the generator is determined by its size and weight. In this deal the implementation of HTS-2G generators is very perspective. The application of HTS 2G field coils in the rotor allows to reduce the size of the generator is 1.75 times. In this work the design 1 MW HTS-2G generator is considered. The designed 1 MW HTS-2G generator has the following parameters: rotor diameter 800 mm, active length 400 mm, phase voltage 690V, rotor speed 600 min-1 rotor field coils with HTS-2G tapes. HTS-2G field coils located in the rotating cryostat and cooled by liquid nitrogen. The simulation and optimization of HTS-2G field coils geometry allowed to increase feed DC current up to 50A. Copper stator windings are water cooled. Magnetic and electrical losses in 1 MW HTS-2G generator do not exceed 1.6% of the nominal output power. In the construction of HTS-2G generator the wave multiplier with ratio 1:40 is used. The latter allows to reduce the total mass of HTS-2G generator down to 1.5 tons. The small-scale model of HTS-2G generator with output power 50 kW was designed, manufactured and tested. The test results showed good agreement with calculation results. The manufacturing of 1 MW HTS-2G generator is planned in 2014. This work is done under support of Rosatom within the frames of Russian Project "Superconducting Industry".

  4. Some results of the 50 MW straight tube steam generator test in the TNO 50 MW SCTF at Hengelo

    International Nuclear Information System (INIS)

    Ludwig, P.W.P.H.; Hus, B.M.

    1975-01-01

    A prototype 50 MW straight tube steam generator has been tested during more than 3000 hours under operating conditions. The steady state, transient and stability behaviour were tested. The most remarkable results of the experiments are given. (author)

  5. Some results of the 50 MW straight tube steam generator test in the TNO 50 MW SCTF at Hengelo

    Energy Technology Data Exchange (ETDEWEB)

    Ludwig, P W.P.H.; Hus, B M

    1975-07-01

    A prototype 50 MW straight tube steam generator has been tested during more than 3000 hours under operating conditions. The steady state, transient and stability behaviour were tested. The most remarkable results of the experiments are given. (author)

  6. Recent R and D status for 70 MW class superconducting generators in the Super-GM project

    International Nuclear Information System (INIS)

    Ageta, T.

    2000-01-01

    Three types of 70 MW class superconducting generators called model machines have been developed to establish basic technologies for a pilot machine. The series of on-site verification tests was completed in June 1999. The world's highest generator output (79 MW), the world's longest continuous operation (1500 hours) and other excellent results were obtained. The model machine was connected to a commercial power grid and fundamental data were collected for future utilization. It is expected that fundamental technologies on design and manufacture required for a 200 MW class pilot machine are established. (author)

  7. Design Tool for 5-20 MW Direct Drive Generators

    DEFF Research Database (Denmark)

    Leban, Krisztina Monika; Ritchie, Ewen; Argeseanu, Alin

    2014-01-01

    This paper reports on a machine design tool for large (5-10MW) direct drive electrical generator. The aim of the work is to construct a flexible calculation tool that enables the analysis of different ideas and concepts for generator design. The tool is intended for engineers that are involved...... in the design of wind turbine systems. The design tool comprises calculation modules that are kept as independent as possible from each other so that new machine geometries and types can be modelled by reusing, recombining and modifying the different modules. Choice of the most suitable candidates...

  8. The new 6 MW gas turbine for the power generation; Die neue 6 MW Gasturbine fuer die Stromerzeugung

    Energy Technology Data Exchange (ETDEWEB)

    Blaswich, Michael; Theis, Sascha [MAN Diesel and Turbo SE, Oberhausen (Germany)

    2012-07-01

    MAN Diesel and Turbo SE (Oberhausen, Federal Republic of Germany) had developed a new gas turbine in the 6 MW class. This device is the founding stone for a family of gas turbines which at first cover the power range from 6 to 8 MW for the propulsion of pumps, compressors and electric devices. The two-shaft industrial gas turbine consists of a gas generator with an axial compressor with eleven levels, six external single combustion chambers, one two-step high-pressure turbine and a two-step power turbine. Beside the two-shaft industrial gas turbine, there exists a single-shaft industrial gas turbine for the power generation. The single-shaft industrial gas turbine consists of three turbine stages, a gas turbine compressor and combustion chamber being identical in construction to the two-shaft industrial gas turbine. The gas turbine package contains the gas turbine module as well as a filter module. The gas turbine was successfully tested. Further tests and the commissioning of the first customer's plant are planned for this year.

  9. Turbine-generators for 400 mw coal-fired power plants

    International Nuclear Information System (INIS)

    Engelke, W.; Bergmann, D.; Boer, J.; Termuehlen, H.

    1991-01-01

    This paper reports that presently, standard coal-fired power plant concepts including flue gas desulfurization (FGD) and DENO x systems are in the design stage to be built on relatively short delivery schedules. The rating in the 400 MW range has generally been selected, because such small power plant units with short delivery times cause a minimum financial burden during planning, delivery and installation. They also follow more closely the growth of electric energy demand at specific locations. However economical considerations could lead to larger unit ratings, since the planning and building process of higher capacity plants is not significantly different but specific plant costs are certainly smaller with increased unit size. Historically large tandem-compound steam turbine-generators have been built and have proven reliable operation with ratings in excess of 800 MW. Already in the late 1950's main steam pressures and temperatures as high as 4,500 psig and 1,200 degrees F respectively were successfully used for smaller steam turbines

  10. Optimization of Wellhead Piping Design for Production Wells at Development of Steam-Water Geothermal Fields

    Directory of Open Access Journals (Sweden)

    A.N. Shulyupin

    2017-03-01

    Full Text Available At present, the exploitation of geothermal resources develops in a fair competition with other types of energy resources. This leads to actuality of questions which associated with the more efficient use of existing wells, because cost of their drilling is a significant share of geothermal projects. In domestic practice of development of geothermal resources the steam-water wells have greatest energy potential. One way to improve the performance of these wells is a providing of smooth change of direction of motion of steam-water mixture from the vertical, in the well, to the horizontal, in steam gathering system. Typical wellhead piping of domestic steam-water wells involves the removal of the mixture through a cross bar at a right angle. Cross bar can generate considerable pressure loss that increases the operating pressure at the mouth of the well and reduces flow rate. It seems reasonable to substitute the typical cross bar by smooth pipe bend. This reduces wellhead resistance coefficient by more than on 2. Increase of curvature radius of pipe bend reduces the pressure loss to a local resistance but increases the friction pressure loss. There is an optimal curvature radius of pipe bend for minimum pressure loss in view of a local resistance and friction in the pipe bend. Calculations have shown that the optimum value for the radius of curvature is found in the range from 1.4 to 4.5 tube internal diameters. However, for technological reasons it is recommended to choose the radius of curvature from 1.4 to 2.4 diameters. Mounting of smooth pipe bend on the wellhead can provide significant economic benefits. For Mutnovka field (Kamchatka, this effect is estimated at 17.5 million rubles in year.

  11. Development of 70 MW class superconducting generator with quick-response excitation

    Science.gov (United States)

    Miyaike, Kiyoshi; Kitajima, Toshio; Ito, Tetsuo

    2002-03-01

    The development of a superconducting generator had been carried out for 12 years under the first stage of a Super GM project. The 70 MW class model machine with quick response excitation was manufactured and evaluated in the project. This type of superconducting generator improves power system stability against rapid load fluctuations at the power system faults. This model machine achieved all development targets including high stability during rapid excitation control. It was also connected to the actual 77 kV electrical power grid as a synchronous condenser and proved advantages and high-operation reliability of the superconducting generator.

  12. Leakage experiences with 1 MW steam generator

    International Nuclear Information System (INIS)

    Kanamori, A.; Kawara, M.; Sano, A.

    1975-01-01

    An 1 MW steam generator was tested from October, 1971 and completed with the first series of experiments by May, 1972 after 3600 hours of operation. During these tests, unextraordinary heat absorption was experienced in the downcomer region, which led to shortage of heat transfer area to attain the rated steam temperature and to one of the reasons of flow instabilities. The steam generator was disassembled to get test pieces for structure as well as material examinations and then it was reassembled to proceed the second series of tests. Before it was done, a modification was provided to insulate the downcomer region by putting a gas space around the downcomer tube. The gas space was provided by a dual tube and spacers were welded on the inner tube and an end plate was welded on upper parts between the two to seal the gap by means of fillet welding. After the modified steam generator was put into operation, water happened to leak into a sodium side two times through these additional welding spots for the gas insulation. This paper presents operating conditions and behaviors of monitors at the time of the leakages, identifications of leaked spots, an evaluation of causes and a treatment or a precaution for them

  13. 12 MW

    DEFF Research Database (Denmark)

    Hasager, Charlotte Bay; Pena Diaz, Alfredo; Mikkelsen, Torben

    '12MW: final report' is for the project with the full title ‘12 MW wind turbines: the scientific basis for their operation at 70 to 270 m height offshore’ that had the goal to experimentally investigate the wind and turbulence characteristics between 70 and 270 m above sea level and thereby...... establish the scientific basis relevant for the next generation of huge 12 MW wind turbines operating offshore. The project started 1st October 2005 and ended 31st March 2009. Firstly was conducted a 6-month experiment at the Horns Rev offshore wind farm deploying a lidar and a sodar on the transformer...

  14. Short Circuits of a 10-MW High-Temperature Superconducting Wind Turbine Generator

    DEFF Research Database (Denmark)

    Song, Xiaowei (Andy); Liu, Dong; Polinder, Henk

    2017-01-01

    Direct Drive high-temperature superconducting (HTS) wind turbine generators have been proposed to tackle challenges for ever increasing wind turbine ratings. Due to smaller reactances in HTS generators, higher fault currents and larger transient torques could occur if sudden short circuits take...... place at generator terminals. In this paper, a finite element model that couples magnetic fields and the generator's equivalent circuits is developed to simulate short-circuit faults. Afterward, the model is used to study the transient performance of a 10-MW HTS wind turbine generator under four...... show that the short circuits pose great challenges to the generator, and careful consideration should be given to protect the generator. The findings presented in this paper would be beneficial to the design, operation and protection of an HTS wind turbine generator....

  15. Short Circuits of a 10 MW High Temperature Superconducting Wind Turbine Generator

    DEFF Research Database (Denmark)

    Song, Xiaowei (Andy); Liu, Dong; Polinder, Henk

    2016-01-01

    Direct drive high temperature superconducting (HTS) wind turbine generators have been proposed to tackle challenges for ever increasing wind turbine ratings. Due to smaller reactances in HTS generators, higher fault currents and larger transient torques could occur if sudden short circuits happen...... at generator terminals. In this paper, a finite element model that couples magnetic fields and the generator’s equivalent circuits is developed to simulate short circuit faults. Afterwards, the model is used to study the transient performance of a 10 MW HTS wind turbine generator under four different short...... that the short circuits pose great challenges to the generator, and careful consideration should be given to protect the generator. The results presented in this paper would be beneficial to the design, operation and protection of an HTS wind turbine generator....

  16. Curvas de arranque de unidades de 100 MW // Starting Graphs of generating units of 100 MW.

    Directory of Open Access Journals (Sweden)

    J. L. Rodríguez Olivera

    2000-03-01

    Full Text Available Se exponen las principales consideraciones para los arranques de las unidades de 100 MW en función del estado térmico yse establecen modelos de comportamiento de los principales parámetros a partir de cualquier estado térmico inicial. Paraello se parte de los métodos establecidos en las instrucciones de explotación vigentes y de las curvas de arranques delfabricante. Los modelos de variación de los parámetros fundamentales permiten obtener las curvas de arranque de estasunidades para cualquier estado térmico inicial, lo que reporta una disminución en los tiempos de puesta en servicio, ahorrode combustible en los arranques, el control y evaluación de los arranques y una mayor seguridad durante la explotación delas unidades. Se presenta un software para la obtención de estos gráficos y toda la información de los arranques.Palabras claves: Gráficos de arranque, unidades térmicas, turbinas de vapor.____________________________________________________________________________AbstractThe principal considerations for the starting of the 100 MW units are exposed in function of thermal state and behavior modelsare established of principal parameters from any thermal initial state are established.The work is based on the performance instructions of stablished methods and starting graphs supply by the manufacturer. Thevariation models of fundamental parameters allow us to obtain the base curves of these units for any thermal initial state. Alsoallow: a diminution in the set times of put on line, saving fuel, evaluation and control of the starting stage and a great securityduring the service of these generating units. A software that allowed to obtain all the starting information and the suitablegraphs is exposed.Key words: Starting graphs, thermal generating units, steam turbine, power plants.

  17. Design of a 2.5MW(e) biomass gasification power generation module

    Energy Technology Data Exchange (ETDEWEB)

    McLellan, R.

    2000-07-01

    The purpose of this contract was to produce a detailed process and mechanical design of a gasification and gas clean up system for a 2.5MW(e) power generation module based on the generation of electrical power from a wood chip feed stock. The design is to enable the detailed economic evaluation of the process and to verify the technical performance data provided by the pilot plant programme. Detailed process and equipment design also assists in the speed at which the technology can be implemented into a demonstration project. (author)

  18. Generation of 99-mW continuous-wave 285-nm radiation for magneto-optical trapping of Mg atoms

    DEFF Research Database (Denmark)

    Madsen, Dorte Nørgaard; Yu, Ping; Balslev, Søren

    2002-01-01

    We have developed a tunable intense narrow-band 285 nm light source based on frequency doubling of 570 nm light in BBO. At input powers of 840 mW (including 130 mW used for locking purposes) we generate 99 mW UV radiation with an intensity profile suitable for laser-cooling experiments. The light...... is used for laser cooling of neutral magnesium atoms in a magneto-optical trap (MOT). We capture about 5 x 10(6) atoms directly from a thermal beam and find that the major loss mechanism of the magnesium MOT is a near-resonant two-photon ionization process....

  19. Simulation of a MW rotor equipped with vortex generators using CFD and an actuator shape model

    DEFF Research Database (Denmark)

    Troldborg, Niels; Zahle, Frederik; Sørensen, Niels N.

    2015-01-01

    This article presents a comparison of CFD simulations of the DTU 10 MW reference wind turbine with and without vortex generators installed on the inboard part of the blades. The vortex generators are modelled by introducing body forces determined using a modified version of the so-called BAY mode...

  20. Wellhead deliverabilty of natural gas - assembling the evidence. Final report

    International Nuclear Information System (INIS)

    Hughes, W.R.

    1995-09-01

    This report presents information about the wellhead delivery of natural gas--the amount of gas the supply industry can produce and deliver to the pipeline. It is designed to help power industry planners evaluate essential aspects of gas supply as part of their overall assessment and utilization of gas-fired power generation. Low prices caused by excess deliverability have led to minimal exploration for new supplies, with the open-quotes bubbleclose quotes of excess deliverability ending. The report examines the facts pertinent to assessing the outlook for deliverability over the intermediate term. It develops deliverability concepts and relates deliverability to reserves and resources. It assesses the available information for measuring and monitoring availability and suggests improvements in available data. The regional outlook for deliverability growth in the Gulf of Mexico and other leading producing regions is also discussed. The report reviews the historical background of present deliverability trends and discusses the industry dynamics that affect development of future deliverability: lead times for increasing deliverability, the declining base of skilled exploration manpower, advancing gas supply technology, and prices required to encourage exploration and development

  1. Design study of a 10 MW MgB2 superconductor direct drive wind turbine generator

    DEFF Research Database (Denmark)

    Abrahamsen, Asger Bech; Magnusson, Niklas; Liu, Dong

    2014-01-01

    A design study of a 10 MW direct drive wind turbine generator based on MgB2 superconducting wires is presented and the cost of the active materials of the generator is estimated to be between 226 €/kW and 84 €/kw, which is lower than the threshold values of 300 €/kW of the INNWIND.EU project. A n...

  2. Marine magnetic studies over a lost wellhead in Palk Bay, Cauvery Basin, India

    Digital Repository Service at National Institute of Oceanography (India)

    Ramana, M.V.; Subrahmanyam, V.; Sarma, K.V.L.N.S.; Seshavataram, B.T.V.

    Close grid marine magnetic surveys in the vicinity of a drill well site PH 9-1 in Palk Bay revealed that the area is characterized by smooth magnetic field except for a local anomaly caused by a lost wellhead. The smooth magnetic field is attributed...

  3. Optimization and comparison of superconducting generator topologies for a 10 MW wind turbine application

    DEFF Research Database (Denmark)

    Liu, Dong; Polinder, Henk; Abrahamsen, Asger Bech

    2017-01-01

    A direct-drive superconducting generator (DDSCG) is proposed for 10 MW wind turbines in the INNWIND.EU project. To fit the generator into the "king-pin" conceptual nacelle design, the generator structure with inner stationary superconducting (SC) field winding and outer rotating copper armature...... winding is investigated in the first research phase. Since the cost is an important performance indicator for this application, this paper presents a method to minimize the active material cost of the "king-pin" fitted DDSCG. In this method a relatively fast optimization program is developed with 2D non...

  4. Control design and performance analysis of a 6 MW wind turbine-generator

    Science.gov (United States)

    Murdoch, A.; Winkelman, J. R.; Javid, S. H.; Barton, R. S.

    1983-01-01

    This paper discusses an approach to the modeling and performance for the preliminary design phase of a large (6.2 MW) horizontal axis wind turbine generator (WTG). Two control philosophies are presented, both of which are based on linearized models of the WT mechanical and electrical systems. The control designs are compared by showing the performance through detailed non-linear time simulation. The disturbances considered are wind gusts, and electrical faults near the WT terminals.

  5. A 20 MW{sub t} pilot plant for the generation of electric power by magnetohydrodynamic process using biomass; Planta piloto de 20 MW{sub t} de geracao de energia eletrica por magnetohidrodinamica a partir da biomassa

    Energy Technology Data Exchange (ETDEWEB)

    Pinatti, D G; Guimaraes, O L.C.; Silva, A C da; Batista, J F [Fundacao de Tecnologia Industrial (FTI), Lorena, SP (Brazil); Fernandes Filho, G E.F.; Magalhaes Filho, P [UNESP, Guaratingueta, SP (Brazil). Faculdade de Engenharia

    1991-12-31

    The combustion of celulignin from biomass with addition of 1% of K, generates a plasma with electric conductivity of 100 S/M. This allows the establishment of a small size thermoelectric plants in triple or double cycle with magnetohydrodynamic generator (MHD), gas turbine and steam turbine. It is presented calculations of a pilot plant of 20 MW{sub t} in the MHD circuit and a total of 30 MW{sub t} with net efficiency of 27%. For plants larger than 60 MW{sub t} it is expected net efficiency larger than 37%. 3 refs., 10 figs., 3 tabs

  6. Dismantling of the 50 MW steam generator test facility

    International Nuclear Information System (INIS)

    Nakai, S.; Onojima, T.; Yamamoto, S.; Akai, M.; Isozaki, T.; Gunji, M.; Yatabe, T.

    1997-01-01

    We have been dismantling the 50MW Steam Generator Test Facility (50MWSGTF). The objectives of the dismantling are reuse of sodium components to a planned large scale thermal hydraulics sodium test facility and the material examination of component that have been operated for long time in sodium. The facility consisted of primary sodium loop with sodium heater by gas burner as heat source instead of reactor, secondary sodium loop with auxiliary cooling system (ACS) and water/steam system with steam temperature and pressure reducer instead of turbine. It simulated the 1 loop of the Monju cooling system. The rated power of the facility was 50MWt and it was about 1/5 of the Monju power plant. Several sodium removal methods are applied. As for the components to be dismantled such as piping, intermediate heat exchanger (IHX), air cooled heat exchangers (AC), sodium is removed by steam with nitrogen gas in the air or sodium is burned in the air. As for steam generators which material tests are planned, sodium is removed by steam injection with nitrogen gas to the steam generator. The steam generator vessel is filled with nitrogen and no air in the steam generator during sodium removal. As for sodium pumps, pump internal structure is pulled out from the casing and installed into the tank. After the installation, sodium is removed by the same method of steam generator. As for relatively small reuse components such as sodium valves, electromagnet flow meters (EMFs) etc., sodium is removed by alcohol process. (author)

  7. A Pole Pair Segment of a 2 MW High Temperature Superconducting Wind Turbine Generator

    DEFF Research Database (Denmark)

    Song, Xiaowei (Andy); Mijatovic, Nenad; Kellers, Jürgen

    2016-01-01

    A 2 MW high temperature superconducting (HTS) generator with 24 pole pairs has been designed for the wind turbine application. In order to identify potential challenges and obtain practical knowledge prior to production, a fullsize stationary experimental set-up, which is one pole pair segment...... generator and the set-up in terms of the flux density, the operating condition of the HTS winding, and the force-generation capability. Finite element (FE) software MagNet is used to carry out numerical simulations. The findings show that the HTS winding in the set-up is a good surrogate...

  8. 77 FR 71788 - Notice of Change to the Publication of Natural Gas Wellhead Prices

    Science.gov (United States)

    2012-12-04

    ... Act (Pub. L. 95-91, 42 U.S.C. 7101 et seq.) require the EIA to carry out a centralized, comprehensive... disseminates information on energy resource reserves, production, demand, technology, and related economic... gas wellhead price using a time-series econometric model, which incorporates data from historical...

  9. A Lift-Off-Tolerant Magnetic Flux Leakage Testing Method for Drill Pipes at Wellhead.

    Science.gov (United States)

    Wu, Jianbo; Fang, Hui; Li, Long; Wang, Jie; Huang, Xiaoming; Kang, Yihua; Sun, Yanhua; Tang, Chaoqing

    2017-01-21

    To meet the great needs for MFL (magnetic flux leakage) inspection of drill pipes at wellheads, a lift-off-tolerant MFL testing method is proposed and investigated in this paper. Firstly, a Helmholtz coil magnetization method and the whole MFL testing scheme are proposed. Then, based on the magnetic field focusing effect of ferrite cores, a lift-off-tolerant MFL sensor is developed and tested. It shows high sensitivity at a lift-off distance of 5.0 mm. Further, the follow-up high repeatability MFL probing system is designed and manufactured, which was embedded with the developed sensors. It can track the swing movement of drill pipes and allow the pipe ends to pass smoothly. Finally, the developed system is employed in a drilling field for drill pipe inspection. Test results show that the proposed method can fulfill the requirements for drill pipe inspection at wellheads, which is of great importance in drill pipe safety.

  10. A Lift-Off-Tolerant Magnetic Flux Leakage Testing Method for Drill Pipes at Wellhead

    Directory of Open Access Journals (Sweden)

    Jianbo Wu

    2017-01-01

    Full Text Available To meet the great needs for MFL (magnetic flux leakage inspection of drill pipes at wellheads, a lift-off-tolerant MFL testing method is proposed and investigated in this paper. Firstly, a Helmholtz coil magnetization method and the whole MFL testing scheme are proposed. Then, based on the magnetic field focusing effect of ferrite cores, a lift-off-tolerant MFL sensor is developed and tested. It shows high sensitivity at a lift-off distance of 5.0 mm. Further, the follow-up high repeatability MFL probing system is designed and manufactured, which was embedded with the developed sensors. It can track the swing movement of drill pipes and allow the pipe ends to pass smoothly. Finally, the developed system is employed in a drilling field for drill pipe inspection. Test results show that the proposed method can fulfill the requirements for drill pipe inspection at wellheads, which is of great importance in drill pipe safety.

  11. 3D electromagnetic design and electrical characteristics analysis of a 10-MW-class hightemperature superconducting synchronous generator for wind power

    International Nuclear Information System (INIS)

    Kim, J. H.; Park, S. I.; Le, T. D.; Kim, H. M.

    2014-01-01

    In this paper, the general electromagnetic design process of a 10-MW-class high-temperature superconducting (HTS) synchronous generator that is intended to be utilized for large scale offshore wind generator is discussed. This paper presents three-dimensional (3D) electromagnetic design proposal and electrical characteristic analysis results of a 10-MW-class HTS synchronous generator for wind power. For more detailed design by reducing the errors of a two-dimensional (2D) design owing to leakage flux in air-gap, we redesign and analyze the 2D conceptual electromagnetic design model of the HTS synchronous generator using 3D finite element analysis (FEA) software. Then electrical characteristics which include the no-load and full-load voltage of generator, harmonic contents of these two load conditions, voltage regulation and losses of generator are analyzed by commercial 3D FEA software.

  12. The Effect of Mounting Vortex Generators on the DTU 10MW Reference Wind Turbine Blade

    DEFF Research Database (Denmark)

    Skrzypinski, Witold Robert; Gaunaa, Mac; Bak, Christian

    2014-01-01

    The aim of the current work is to analyze possible advantages of mounting Vortex Generators (VG's) on a wind turbine blade. Specifically, the project aims at investigating at which radial sections of the DTU 10 MW Reference Wind Turbine blade it is most beneficial to mount the VG's in order...

  13. Ripple Field AC Losses in 10-MW Wind Turbine Generators With a MgB2 Superconducting Field Winding

    DEFF Research Database (Denmark)

    Liu, Dong; Polinder, Henk; Magnusson, Niklas

    2016-01-01

    Superconducting (SC) synchronous generators are proposed as a promising candidate for 10-20-MW direct-drive wind turbines because they can have low weights and small sizes. A common way of designing an SC machine is to use SC wires with high current-carrying capability in the dc field winding...... and the ac armature winding is made with copper conductors. In such generators, the dc field winding is exposed to ac magnetic field ripples due to space harmonics from the armature. In generator design phases, the ac loss caused by these ripple fields needs to be evaluated to avoid local overheating...... and an excessive cooling budget. To determine the applicability of different design solutions in terms of ac losses, this paper estimates the ac loss level of 10-MW wind generator designs employing a MgB2 SC field winding. The effects on ac losses are compared between nonmagnetic and ferromagnetic teeth...

  14. Full-load converter connected asynchronous generators for MW class wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Akhmatov, Vladislav

    2005-06-15

    Wind turbines equipped with full-load converter-connected asynchronous generators are a known concept. These have rating up to hundreds of kW and are a feasible concept for MW class wind turbines and may have advantages when compared to conventional wind turbines with directly connected generators. The concept requires the use of full-scale frequency converters, but the mechanical gearbox is smaller than in conventional wind turbines of the same rating. Application of smaller gearbox may reduce the no-load losses in the wind turbines, which is why such wind turbines with converter connected generators may start operation at a smaller wind speed. Wind turbines equipped with such converted connected asynchronous generators are pitch-controlled and variable-speed. This allows better performance and control. The converter control may be applied to support the grid voltage at short-circuit faults and to improve the fault-ride-through capability of the wind turbines, which makes the concepts relevant for large wind farms. The Danish transmission system operator Energinet-DK has implemented the general model of wind turbines equipped with converter connected asynchronous generators with the simulation tool Powerfactory (DlgSilent). The article presents Energinet-DK's experience of modeling this feasible wind turbine concept. (Author)

  15. Wellhead gas compression extends life of beam-pumped wells

    International Nuclear Information System (INIS)

    Sherry, M.J.; Fairchild, P.W.

    1992-01-01

    This paper reports that operators of marginal oil and gas wells often can avoid having to shut them in by compressing gas from the back side of the casing at the well head and delivering it into the flowline. This process can reduce the back pressure at the face of the producing formation, which allows additional oil and gas to be produced and extends the economical reserves. Small, low-horsepower stationary compressors or a walking beam compressor (WBC) may be used for this purpose. A portable compressor test unit recently has been employed to evaluate wells that are possible candidates for wellhead compression as another cost cutting measure

  16. A Pole Pair Segment of a 2-MW High-Temperature Superconducting Wind Turbine Generator

    DEFF Research Database (Denmark)

    Song, Xiaowei (Andy); Mijatovic, Nenad; Kellers, Jürgen

    2017-01-01

    A 2-MW high-temperature superconducting (HTS) generator with 24 pole pairs has been designed for the wind turbine application. In order to identify potential challenges and obtain practical knowledge prior to production, a full-size stationary experimental setup, which is one pole pair segment...... and the setup in terms of the flux density, the operating condition of the HTS winding, and the force-generation capability. Finite element (FE) software MagNet is used to carry out numerical simulations. The findings show that the HTS winding in the setup is a good surrogate for these that would be used...

  17. Optimized Generator Designs for the DTU 10-MW Offshore Wind Turbine using GeneratorSE

    Energy Technology Data Exchange (ETDEWEB)

    Sethuraman, Latha; Maness, Michael; Dykes, Katherine

    2017-01-09

    Compared to land-based applications, offshore wind imposes challenges for the development of next generation wind turbine generator technology. Direct-drive generators are believed to offer high availability, efficiency, and reduced operation and maintenance requirements; however, previous research suggests difficulties in scaling to several megawatts or more in size. The resulting designs are excessively large and/or massive, which are major impediments to transportation logistics, especially for offshore applications. At the same time, geared wind turbines continue to sustain offshore market growth through relatively cheaper and lightweight generators. However, reliability issues associated with mechanical components in a geared system create significant operation and maintenance costs, and these costs make up a large portion of overall system costs offshore. Thus, direct-drive turbines are likely to outnumber their gear-driven counterparts for this market, and there is a need to review the costs or opportunities of building machines with different types of generators and examining their competitiveness at the sizes necessary for the next generation of offshore wind turbines. In this paper, we use GeneratorSE, the National Renewable Energy Laboratory's newly developed systems engineering generator sizing tool to estimate mass, efficiency, and the costs of different generator technologies satisfying the electromagnetic, structural, and basic thermal design requirements for application in a very large-scale offshore wind turbine such as the Technical University of Denmark's (DTU) 10-MW reference wind turbine. For the DTU reference wind turbine, we use the previously mentioned criteria to optimize a direct-drive, radial flux, permanent-magnet synchronous generator; a direct-drive electrically excited synchronous generator; a medium-speed permanent-magnet generator; and a high-speed, doubly-fed induction generator. Preliminary analysis of leveled costs of

  18. Economic analysis of process steam and electricity generation by a 200 MW NHR

    International Nuclear Information System (INIS)

    Tian Li; Wang Yongqing

    2000-01-01

    New applications for low temperature nuclear heating reactors should be developed using economic analysis. This paper compares and analyzes the economics of the generation 1.5 MPa process steam and electricity by a 200 MW nuclear heating reactor (NHR-200) for industrial development. The project is very attractive economically with an internal rate of return of 19.61%, a net present worth (discount rate 10%) of 765 million yuan RMB and a capital recovery or payback period of about 5 years after construction is completed. Compared with only using the NHR-200 for in winter heating, the economic of process steam and electricity generation by NHR-200 are much better. In addition, the NHR-200 will significantly improve environmental pollution in cities and reduce the transport of coal from north to south in China

  19. Weighted Average Cost of Retail Gas (WACORG) highlights pricing effects in the US gas value chain: Do we need wellhead price-floor regulation to bail out the unconventional gas industry?

    International Nuclear Information System (INIS)

    Weijermars, Ruud

    2011-01-01

    The total annual revenue stream in the US natural gas value chain over the past decade is analyzed. Growth of total revenues has been driven by higher wellhead prices, which peaked in 2008. The emergence of the unconventional gas business was made possible in part by the pre-recessional rise in global energy prices. The general rise in natural gas prices between 1998 and 2008 did not lower overall US gas consumption, but shifts have occurred during the past decade in the consumption levels of individual consumer groups. Industry's gas consumption has decreased, while power stations increased their gas consumption. Commercial and residential consumers maintained flat gas consumption patterns. This study introduces the Weighted Average Cost of Retail Gas (WACORG) as a tool to calculate and monitor an average retail price based on the different natural gas prices charged to the traditional consumer groups. The WACORG also provides insight in wellhead revenues and may be used as an instrument for calibrating retail prices in support of wellhead price-floor regulation. Such price-floor regulation is advocated here as a possible mitigation measure against excessive volatility in US wellhead gas prices to improve the security of gas supply. - Highlights: → This study introduces an average retail price, WACORG. → WACORG can monitor price differentials for the traditional US gas consumer groups. → WACORG also provides insight in US wellhead revenues. → WACORG can calibrate retail prices in support of wellhead price-floor regulation. → Gas price-floor can improve security of gas supply by reducing price volatility.

  20. Probabilistic risk analysis and fault trees: Initial discussion of application to identification of risk at a wellhead

    Science.gov (United States)

    Rodak, C.; Silliman, S.

    2012-02-01

    Wellhead protection is of critical importance for managing groundwater resources. While a number of previous authors have addressed questions related to uncertainties in advective capture zones, methods for addressing wellhead protection in the presence of uncertainty in the chemistry of groundwater contaminants, the relationship between land-use and contaminant sources, and the impact on health of the receiving population are limited. It is herein suggested that probabilistic risk analysis (PRA) combined with fault trees (FT) provides a structure whereby chemical transport can be combined with uncertainties in source, chemistry, and health impact to assess the probability of negative health outcomes in the population. As such, PRA-FT provides a new strategy for the identification of areas of probabilistically high human health risk. Application of this approach is demonstrated through a simplified case study involving flow to a well in an unconfined aquifer with heterogeneity in aquifer properties and contaminant sources.

  1. Conceptual designs for 100-MW space radiators

    International Nuclear Information System (INIS)

    Prenger, F.C.; Sullivan, J.A.

    1982-01-01

    A description and comparison of heat rejection systems for multimegawatt space-based power supplies is given. Current concepts are described, and through a common performance parameter, these are compared with three advanced radiator concepts. The comparison is based on a power system that rejects 100 MW of heat while generating 10 MW of electrical power

  2. Nine steps to risk-informed wellhead protection and management: Methods and application to the Burgberg Catchment

    Science.gov (United States)

    Nowak, W.; Enzenhoefer, R.; Bunk, T.

    2013-12-01

    Wellhead protection zones are commonly delineated via advective travel time analysis without considering any aspects of model uncertainty. In the past decade, research efforts produced quantifiable risk-based safety margins for protection zones. They are based on well vulnerability criteria (e.g., travel times, exposure times, peak concentrations) cast into a probabilistic setting, i.e., they consider model and parameter uncertainty. Practitioners still refrain from applying these new techniques for mainly three reasons. (1) They fear the possibly cost-intensive additional areal demand of probabilistic safety margins, (2) probabilistic approaches are allegedly complex, not readily available, and consume huge computing resources, and (3) uncertainty bounds are fuzzy, whereas final decisions are binary. The primary goal of this study is to show that these reservations are unjustified. We present a straightforward and computationally affordable framework based on a novel combination of well-known tools (e.g., MODFLOW, PEST, Monte Carlo). This framework provides risk-informed decision support for robust and transparent wellhead delineation under uncertainty. Thus, probabilistic risk-informed wellhead protection is possible with methods readily available for practitioners. As vivid proof of concept, we illustrate our key points on a pumped karstic well catchment, located in Germany. In the case study, we show that reliability levels can be increased by re-allocating the existing delineated area at no increase in delineated area. This is achieved by simply swapping delineated low-risk areas against previously non-delineated high-risk areas. Also, we show that further improvements may often be available at only low additional delineation area. Depending on the context, increases or reductions of delineated area directly translate to costs and benefits, if the land is priced, or if land owners need to be compensated for land use restrictions.

  3. The ''controbloc'', a programmable automatic device for the 1,300 MW generation of power stations

    International Nuclear Information System (INIS)

    Pralus, B.; Winzelle, J.C.

    1983-01-01

    Technological progress in the field of microelectronics has led to the development of an automatic control device, the ''controbloc'', for operating and controlling nuclear power plants. The ''controbloc'' will be used in automatic systems with a high degree of safety and versatility and is now being installed in the first of the new generation 1,300 MW power stations. The main characteristics of the device and the evaluation tests which have been carried out are described [fr

  4. Optimized Generator Designs for the DTU 10-MW Offshore Wind Turbine using GeneratorSE: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Sethuraman, Latha; Maness, Michael; Dykes, Katherine

    2017-01-01

    Compared to land-based applications, offshore wind imposes challenges for the development of next generation wind turbine generator technology. Direct-drive generators are believed to offer high availability, efficiency, and reduced operation and maintenance requirements; however, previous research suggests difficulties in scaling to several megawatts or more in size. The resulting designs are excessively large and/or massive, which are major impediments to transportation logistics, especially for offshore applications. At the same time, geared wind turbines continue to sustain offshore market growth through relatively cheaper and lightweight generators. However, reliability issues associated with mechanical components in a geared system create significant operation and maintenance costs, and these costs make up a large portion of overall system costs offshore. Thus, direct-drive turbines are likely to outnumber their gear-driven counterparts for this market, and there is a need to review the costs or opportunities of building machines with different types of generators and examining their competitiveness at the sizes necessary for the next generation of offshore wind turbines. In this paper, we use GeneratorSE, the National Renewable Energy Laboratory's newly developed systems engineering generator sizing tool to estimate mass, efficiency, and the costs of different generator technologies satisfying the electromagnetic, structural, and basic thermal design requirements for application in a very large-scale offshore wind turbine such as the Technical University of Denmark's (DTU) 10-MW reference wind turbine. For the DTU reference wind turbine, we use the previously mentioned criteria to optimize a direct-drive, radial flux, permanent-magnet synchronous generator; a direct-drive electrically excited synchronous generator; a medium-speed permanent-magnet generator; and a high-speed, doubly-fed induction generator. Preliminary analysis of leveled costs of

  5. Failure analysis to the weights of balance of a 350 MW turbo-generator; Analisis de falla a los pesos de balanceo de un turbogenerador de 350 MW

    Energy Technology Data Exchange (ETDEWEB)

    Vital Flores, Francisco; Gamero Arroyo, Jose Manuel [LAPEM, Comision Federal de Electricidad (Mexico)

    2007-11-15

    The selection of materials and the quality control in the supply of the components, as well as the involved operative variables in the process of work to which an equipment, device or a system of a power station of electrical generation are subjected, impact in the same in their useful life in a decisive way. In this document it is presented an analysis of a failure occurred in a 350 MW turbo-generator by the loosening of the balance weights, in which it is mentioned the flaws occurred by this cause and a metallographic analysis that indicates the main fault for the happening. [Spanish] La seleccion de material y el control de calidad en los suministros de los componentes, asi como las variables operativas involucradas en el proceso de trabajo al cual es sometido un equipo, dispositivo o un sistema de una central de generacion electrica, impactan en los mismos de manera decisiva en su vida util. En este documento se presenta un analisis de falla ocurrido en un turbogenerador de 350 MW, por el desprendimiento de los pesos de balanceo, el cual se menciona de los desperfectos ocurridos por esta causa y un analisis metalografico que indica la falla principal por lo ocurrido.

  6. Topology Comparison of Superconducting Generators for 10-MW Direct-Drive Wind Turbines: Cost of Energy Based

    DEFF Research Database (Denmark)

    Liu, Dong; Polinder, Henk; Abrahamsen, Asger Bech

    2017-01-01

    This paper aims at finding feasible electromagnetic designs of superconducting synchronous generators (SCSGs) for a 10-MW direct-drive wind turbine. Since a lower levelized cost of energy (LCoE) increases the feasibility of SCSGs in this application, 12 generator topologies are compared regarding...... their LCoE in a simplified form of levelized equipment cost of energy (LCoE$_{\\text{eq}}$). MgB$_2$ wires are employed in the field winding. Based on the current unit cost and critical current density capability of the MgB $_2$ wire at 20 K, the topologies with more iron have a much lower LCo...

  7. Comparison of Levelized Cost of Energy of superconducting direct drive generators for a 10 MW offshore wind turbine

    DEFF Research Database (Denmark)

    Abrahamsen, Asger Bech; Liu, Dong; Magnusson, Niklas

    2018-01-01

    A method for comparing the Levelized Cost of Energy (LCoE) of different superconducting drive trains is introduced. The properties of a 10 MW MgB$_{2}$ superconducting direct drive generator are presented in terms weight scaled to a turbine with a rotor diameter up of 280 m and the cost break down...

  8. 6MW solar plant integration feasibility study : Bonaire island case study

    NARCIS (Netherlands)

    Sun, Yin; De Jong, Erik; Cuk, Vladimir; Cobben, Sjef

    2016-01-01

    The power supply on Bonaire is characterized by a high penetration of wind energy. Currently 5 diesel generators (total capacity 14MW) and 12 wind turbines (total capacity 10.8MW) operated by ContourGlobal generate electricity for Water and Electricity Bonaire (WEB). To meet future power demand

  9. Structural Optimization of an Innovative 10 MW Wind Turbine Nacelle

    DEFF Research Database (Denmark)

    Dabrowski, Dariusz; Natarajan, Anand; Stehouwer, Ewoud

    2015-01-01

    For large wind turbine configurations of 10 MW and higher capacities, direct-drives present a more compact solution over conventional geared drivetrains. Further, if the generator is placed in front of the wind turbine rotor, a compact “king-pin” drive is designed, that allows the generator...... to be directly coupled to the hub. In presented study, the structural re-design of the innovative 10 MW nacelle was made using extreme loads obtained from a 10 MW reference wind turbine. On the basis of extreme loads the ultimate stresses on critical nacelle components were determined to ensure integrity...

  10. Comparison and assessment of electricity generation capacity for different types of PV solar plants of 1MW in Soko banja, Serbia

    Directory of Open Access Journals (Sweden)

    Pavlović Tomislav M.

    2011-01-01

    Full Text Available This paper gives the results of the electricity generated by the fixed, one-axis and dual-axis tracking PV solar plant of 1 MW with flat PV panels made of monocrystalline silicon which is to be built in the area of Soko banja (spa in Serbia. Further on follows a description of the functioning of the fixed and one-axis and dual-axis tracking PV solar plant. For the calculation of the electricity generated by these plants PVGIS program from the Internet was used. Calculations have shown that fixed PV solar plant power of 1 MW, solar modules of monocrystalline silicon yield 1130000 kWh power output, one-axis tracking PV solar plant yields 1420000 kWh, and dual-axis tracking PV solar plant yields 1450000 kWh of electricity. Electricity generated by the fixed PV solar plant could satisfy 86% of the annual needs for the electricity of the „Zdravljak“ hotel and the special „Novi stacionar“ hospital in Soko banja.

  11. 350 MW(t) MHTGR preassembly and modularization

    International Nuclear Information System (INIS)

    Venkatesh, M.C.; Jones, G.; Dilling, D.A.; Parker, W.J.

    1991-05-01

    The Modular High Temperature Gas Cooled Reactor (MHTGR) provides a safe and economical nuclear power option for the world's electrical generation needs by the turn of the century. The proposed MHTGR plant is composed of four 350 MW(t) prismatic core reactor modules, coupled to a 2(2 x 1) turbine generator producing a net plant electrical output of 538 MW(e). Each of the four reactor module is located in a below-ground level concrete silo, and consists of a reactor vessel and a steam generator vessel interconnected by a cross duct vessel. The modules, along with the service buildings, are contained within a Nuclear Island (NI). The turbine generators and power generation facilities are in the non-nuclear Energy Conversion Area (ECA). The MHTGR design reduces cost and improves schedule by maximizing shop fabrication, minimizing field fit up of the Reactor Internals components and modularizing the NI ampersand ECA facilities. 3 refs., 6 figs., 2 tabs

  12. Impact of protection settings of the distributed generation frequency under 1MW in the national electric system

    International Nuclear Information System (INIS)

    Alpizar Chavarria, Oscar

    2013-01-01

    A literature review is conducted to understand the distributed generation, the reason for the introduction into modern power systems and other distributed generation technologies based on renewable energies that have been installed around the country. The frequency protections of distributed generation equipment under 1MW are studied according to international standards like IEEE-1547 and specifications of equipment manufacturers. The influence of the recommended international standards settings are investigated for systems of distributed generation, the performance in frequency that have presented under some frequency perturbation, as well as the influence that can have on the national and regional electrical system, with different amounts of technologies included in the national system. The recommended settings are evaluated through simulations in PSSE program in the context of the behavior of the frequency in the national electric system [es

  13. A Lift-Off-Tolerant Magnetic Flux Leakage Testing Method for Drill Pipes at Wellhead

    OpenAIRE

    Wu, Jianbo; Fang, Hui; Li, Long; Wang, Jie; Huang, Xiaoming; Kang, Yihua; Sun, Yanhua; Tang, Chaoqing

    2017-01-01

    To meet the great needs for MFL (magnetic flux leakage) inspection of drill pipes at wellheads, a lift-off-tolerant MFL testing method is proposed and investigated in this paper. Firstly, a Helmholtz coil magnetization method and the whole MFL testing scheme are proposed. Then, based on the magnetic field focusing effect of ferrite cores, a lift-off-tolerant MFL sensor is developed and tested. It shows high sensitivity at a lift-off distance of 5.0 mm. Further, the follow-up high repeatabilit...

  14. 50 MW C-band pulse klystron; 50MW C band pulse klystron

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    C-band pulse klystron E3746 with an output of 50 MW class was developed jointly with the High-Energy Accelerator Research Organization in the Ministry of Education as the klystron for a linear accelerator. For a large-sized linear accelerator in the next generation, a klystron with higher operating frequency has been required to obtain a compact and efficient accelerator. In E3746, the problem of power resistance during high-frequency operation was solved by mounting a traveling-wave multi-cell output circuit. Moreover, stable operation in the pulse width of 2.5 {mu}s and the output of 54 MW was performed at the same operation efficiency (44%) as the conventional S-band tube by using the frequency (in a C-band frequency band) that is two times as high as the conventional general accelerator. (translated by NEDO)

  15. Comparison of MgB2 and Coated Conductor Based 5 MW Superconducting Wind Turbine Generator

    DEFF Research Database (Denmark)

    Abrahamsen, Asger Bech; Jensen, Bogi Bech

    2012-01-01

    conductors, but the operation temperature in range of T = 15-20 K and the engineering current density Je is smaller. We have found that a 16 pole synchronous generator with active diameter D = 4.2 m and length L = 1.5 m based on a MgB2 wire with Je = 70 A/mm2 in approximately 4 Tesla field would result...... in a wire usage in the order of 330 km. This has the potential to decrease the price of the superconductor wires in the generator by a factor of 10 compared to the coated conductors, but the cryogenics will be a challenge and is discussed. Finally we will use turbine load simulations to discuss the torque...... events that such a 5 MW generator would experience if installed in the NREL turbine....

  16. Control system design for the MOD-5A 7.3 mW wind turbine generator

    Science.gov (United States)

    Barton, Robert S.; Hosp, Theodore J.; Schanzenbach, George P.

    1995-01-01

    This paper provides descriptions of the requirements analysis, hardware development and software development phases of the Control System design for the MOD-5A 7.3 mW Wind Turbine Generator. The system, designed by General Electric Company, Advanced Energy Programs Department, under contract DEN 3-153 with NASA Lewis Research Center and DOE, provides real time regulation of rotor speed by control of both generator torque and rotor torque. A variable speed generator system is used to provide both airgap torque control and reactive power control. The wind rotor is designed with segmented ailerons which are positioned to control blade torque. The central component of the control system, selected early in the design process, is a programmable controller used for sequencing, alarm monitoring, communication, and real time control. Development of requirements for use of aileron controlled blades and a variable speed generator required an analytical simulation that combined drivetrain, tower and blade elastic modes with wind disturbances and control behavior. An orderly two phase plan was used for controller software development. A microcomputer based turbine simulator was used to facilitate hardware and software integration and test.

  17. Transient flow conditions in probabilistic wellhead protection: importance and ways to manage spatial and temporal uncertainty in capture zone delineation

    Science.gov (United States)

    Enzenhoefer, R.; Rodriguez-Pretelin, A.; Nowak, W.

    2012-12-01

    "From an engineering standpoint, the quantification of uncertainty is extremely important not only because it allows estimating risk but mostly because it allows taking optimal decisions in an uncertain framework" (Renard, 2007). The most common way to account for uncertainty in the field of subsurface hydrology and wellhead protection is to randomize spatial parameters, e.g. the log-hydraulic conductivity or porosity. This enables water managers to take robust decisions in delineating wellhead protection zones with rationally chosen safety margins in the spirit of probabilistic risk management. Probabilistic wellhead protection zones are commonly based on steady-state flow fields. However, several past studies showed that transient flow conditions may substantially influence the shape and extent of catchments. Therefore, we believe they should be accounted for in the probabilistic assessment and in the delineation process. The aim of our work is to show the significance of flow transients and to investigate the interplay between spatial uncertainty and flow transients in wellhead protection zone delineation. To this end, we advance our concept of probabilistic capture zone delineation (Enzenhoefer et al., 2012) that works with capture probabilities and other probabilistic criteria for delineation. The extended framework is able to evaluate the time fraction that any point on a map falls within a capture zone. In short, we separate capture probabilities into spatial/statistical and time-related frequencies. This will provide water managers additional information on how to manage a well catchment in the light of possible hazard conditions close to the capture boundary under uncertain and time-variable flow conditions. In order to save computational costs, we take advantage of super-positioned flow components with time-variable coefficients. We assume an instantaneous development of steady-state flow conditions after each temporal change in driving forces, following

  18. Comparison and assessment of electricity generation capacity for different types of PV solar plants of 1MW in Soko banja, Serbia

    OpenAIRE

    Pavlović Tomislav M.; Milosavljević Dragana D.; Radivojević Aleksandar R.; Pavlović Mila A.

    2011-01-01

    This paper gives the results of the electricity generated by the fixed, one-axis and dual-axis tracking PV solar plant of 1 MW with flat PV panels made of monocrystalline silicon which is to be built in the area of Soko banja (spa in Serbia). Further on follows a description of the functioning of the fixed and one-axis and dual-axis tracking PV solar plant. For the calculation of the electricity generated by these plants PVGIS program from the Internet was used. Calculations have shown ...

  19. The 1.5 MW wind turbine of tomorrow

    Energy Technology Data Exchange (ETDEWEB)

    De Wolff, T.J.; Sondergaard, H. [Nordtank Energy Group, Richmond, VA (United States)

    1996-12-31

    The Danish company Nordtank is one of the pioneers within the wind turbine industry. Since 1981 Nordtank has installed worldwide more than 2300 wind turbine generators with a total name plate capacity that is exceeding 350 MW. This paper will describe two major wind turbine technology developments that Nordtank has accomplished during the last year: Site Optimization of Nordtank wind turbines: Nordtank has developed a flexible design concept for its WTGs in the 500/600 kW range, in order to offer the optimal WTG solution for any given site and wind regime. Nordtank`s 1.5 MW wind turbine: In September 1995, Nordtank was the first company to install a commercial 1.5 NM WTG. This paper will document the development process, the design as well as operations of the Nordtank 1.5 MW WTG.

  20. Construction, completion, and testing of replacement monitoring wells MW 3-2, MW 6-2, MW 7-2, and MW 11-2, Mountain Home Air Force Base, Idaho, February through April 2000

    Science.gov (United States)

    Parliman, D.J.

    2000-01-01

    In February and March 2000, the U.S. Geological Survey Western Regional Research Drilling Operation constructed replacement monitoring wells MW 3–2, MW 6–2, MW 7–2, and MW 11–2 as part of a regional ground-water monitor- ing network for the Mountain Home Air Force Base, Elmore County, Idaho. Total well depths ranged from 435.5 to 456.5 feet, and initial depth-to-water measurements ranged from about 350 to 375 feet below land surface. After completion, wells were pumped and onsite measurements were made of water temperature, specific conductance, pH, and dissolved oxygen. At each well, natural gamma, spontaneous potential, resistivity, caliper, and temperature logs were obtained from instruments placed in open boreholes. A three- dimensional borehole flow analysis was completed for MW 3–2 and MW 11–2, and a video log was obtained for MW 11–2 to annotate lithology and note wet zones in the borehole above saturated rock.

  1. Economic Development Impact of 1,000 MW of Wind Energy in Texas

    Energy Technology Data Exchange (ETDEWEB)

    Reategui, S.; Hendrickson, S.

    2011-08-01

    Texas has approximately 9,727 MW of wind energy capacity installed, making it a global leader in installed wind energy. As a result of the significant investment the wind industry has brought to Texas, it is important to better understand the economic development impacts of wind energy in Texas. This report analyzes the jobs and economic impacts of 1,000 MW of wind power generation in the state. The impacts highlighted in this report can be used in policy and planning decisions and can be scaled to get a sense of the economic development opportunities associated with other wind scenarios. This report can also inform stakeholders in other states about the potential economic impacts associated with the development of 1,000 MW of new wind power generation and the relationships of different elements in the state economy.

  2. Generation of more than 300 mW diffraction-limited light at 405 nm by second-harmonic generation of a tapered diode laser with external cavity feedback

    DEFF Research Database (Denmark)

    Jensen, Ole Bjarlin; Holm, J.; Sumpf, B.

    2007-01-01

    We have constructed a blue laser source consisting of a single-frequency tapered diode laser with external cavity feedback that is frequency doubled by a quasi-phase matched KTP (PPKTP) in a bowtie ring cavity and extract more than 360 mW of power at 405 nm. The conversion efficiency from...... fundamental laser power to second harmonic power is 35 %, while it is 64 % from coupled fundamental power to extracted blue light. Thermal effects and gray tracking set an upper limit on the amount of generated blue light....

  3. Distributed generation with photovoltaic systems: A utility perspective

    International Nuclear Information System (INIS)

    Vigotti, R.

    1998-01-01

    Today PV power systems are already cost-effective and commonly employed in a wide range of remote applications such as electricity supply to isolated users and small communities; water pumping and desalination; powering of service equipment such as radio repeaters; pipelines and well-heads cathodic protection. PV systems can easily cover a broad range of power requirements, allowing them to take advantage of new niche markets as they develop. Besides such applications a ''non-power'', low performance, consumer market also exists (watches, calculators, gadgets) that has already reached a stable growth condition. In the last decade, an increase has been experienced of about three times in the amount of module shipments (103 MW expected in 1997), a more balanced regional manufacturer share has developed, crystalline technology has maintained its lead, and a more market-oriented application share has appeared (at present most applications are for stand-alone)

  4. Fabrication of a Scaled MgB2 Racetrack Demonstrator Pole for a 10-MW Direct-Drive Wind Turbine Generator

    DEFF Research Database (Denmark)

    Magnusson, Niklas; Eliassen, Jan Christian; Abrahamsen, Asger Bech

    2018-01-01

    Field windings made of MgB2 wires or tapes are considered for their potential to reduce volume, weight, and cost of large offshore wind turbine generators. To gain experience of how to use this relatively new material in full-scale generators, tests of different winding methodologies and techniques...... are needed. In this paper, we describe in detail the steps used to wind a racetrack coil with a length of 1 m and a width of 0.5 m out of 4.5 km of MgB2 superconducting tape. The width corresponds to a full-scale pole of a 10-MW generator, whereas the length of the straight section is shorter than...... the corresponding full-scale pole. The coil was built up of ten double pancake coils. Each double pancake coil was wet wound using a semiautomatic winding process, where Stycast 2850 was applied directly to the MgB2 tape without any other dedicated electrical insulation. The strengths and weaknesses of the winding...

  5. Studi Pemanfaatan Limbah Padat dari Perkebunan Kelapa Sawit pada PLTU 6 MW di Bangka Belitung

    Directory of Open Access Journals (Sweden)

    Harris Harris

    2013-03-01

    Full Text Available Limbah padat dari perkebunan kelapa sawit berupa cangkang dan fibre dapat dimanfaatkan sebagai sumber energi alternatif pada PLTU. Cangkang memiliki kandungan energi sebesar 4115 kkal/kg dan fibre sebesar 3500 kkal/kg. Cangkang dan fibre dimanfaatkan sebagai bahan bakar pada PLTU 6 MW, yang digunakan untuk memanaskan air didalam boiler sehingga menghasilkan temperatur uap dan tekanan uap yang mampu memutar turbin uap. Turbin uap berfungsi sebagai prime mover untuk memutar generator sehingga menghasilkan output berupa daya listrik. Pada saat menggunakan bahan bakar cangkang PLTU 6 MW menghasilkan ouput rata – rata sebesar 4.8 MW/hr dan dalam 1 MW output membutuhkan 1.02 ton cangkang dan pada saat menggunakan bahan bakar fibre PLTU 6 MW menghasilkan output rata – rata 2.3 MW/hr dan dalam 1 MW output membutuhkan 1.83 ton fibre. Karena lebih optimal dalam pengoperasian serta maksimalnya output yang dihasilkan dari bahan bakar cangkang, maka efisiensinya pun lebih baik. Efisiensi PLTU 6 MW pada saat menggunakan bahan bakar cangkang sebesar 20.5 % dan efisiensi PLTU 6 MW dari bahan bakar fibre 13 %. Oleh karena itu bahan bakar cangkang merupakan bahan bakar utama yang digunakan pada PLTU 6 MW.

  6. 60-MW test using the 30-MW klystrons for the KEKB project

    Science.gov (United States)

    Fukuda, S.; Michizono, S.; Nakao, K.; Saito, Y.; Anami, S.

    1995-07-01

    The B-Factory is a future plan, requiring an energy upgrade of the KEK linac from 2.5 GeV to 8.0 GeV (KEKB Project). This paper describes the recent development of an S-band high-power pulse klystron to be used as the PF-linac rf-source of the B-Factory. This tube is a modified version of the existing 30-MW tube, which produces 51 MW at a 310 kV beam voltage by optimizing the focusing magnetic field. In order to increase the reliability, the cathode diameter, the gun housing, and the insulation ceramic-seal were enlarged. This tube was redesigned so as to have the same characteristics as the test results of 30-MW tubes at a higher applied voltage without changing the rf interaction region. Four prototype tubes have been manufactured; final test results showed that these new tubes produce an output power of more than 50 MW at 310 kV with an efficiency of 46%. Recently this tube has produced more than 60 MW at a 350 kV beam voltage for a demonstration test. A comparison between the FCI-code prediction and the test results is also given in this paper.

  7. Updated API document 6A will close API-ISO 9000 gap. [Oil and gas wellhead standards

    Energy Technology Data Exchange (ETDEWEB)

    Bell, S.

    1993-10-01

    The 17th edition of the American Petroleum Institute's (API) document 6A, covering wellheads and their components, is due early next year. As the API vs. International Standards Organization (ISO) 9000 struggle continues, this edition of 6A eliminates some unnecessary specifications, clarifies others, and includes metric specifications accepted by the ISO. The 17th edition will clarify some of the interpretations from earlier editions and further advise users how to acquire the API monogram. The goal of this edition is to make 6A acceptable to ISO as an international document so API can maintain control over petroleum equipment specifications and provide input and guidance in future regulations.

  8. Remote Triggering of the Mw 6.9 Hokkaido Earthquake as a Result of the Mw 6.6 Indonesian Earthquake on September 11, 2008

    Directory of Open Access Journals (Sweden)

    Cheng-Horng Lin

    2012-01-01

    Full Text Available Only just recently, the phenomenon of earthquakes being triggered by a distant earthquake has been well established. Yet, most of the triggered earthquakes have been limited to small earthquakes (M < 3. Also, the exact triggering mechanism for earthquakes is still not clear. Here I show how one strong earthquake (Mw = 6.6 is capable of triggering another (Mw = 6.9 at a remote distance (~4750 km. On September 11, 2008, two strong earthquakes with magnitudes (Mw of 6.6 and 6.9 hit respectively in Indonesia and Japan within a short interval of ~21 minutes time. Careful examination of broadband seismograms recorded in Japan shows that the Hokkaido earthquake occurred just as the surface waves generated by the Indonesia earthquake arrived. Although the peak dynamic stress estimated at the focus of the Hokkaido earthquake was just reaching the lower bound for the capability of triggering earthquakes in general, a more plausible mechanism for triggering an earthquake might be attributed to the change of a fault property by fluid infiltration. These observations suggest that the Hokkaido earthquake was likely triggered from a remote distance by the surface waves generated from the Indonesia earthquake. If some more cases can be observed, a temporal warning of possible interaction between strong earthquakes might be concerned in the future.

  9. 60-MW/sub t/ methanation plant design for HTGR process heat

    International Nuclear Information System (INIS)

    Davis, C.R.; Arcilla, N.T.; Hui, M.M.; Hutchins, B.A.

    1982-07-01

    This report describes a 60 MW(t) Methanation Plant for generating steam for industrial applications. The plant consists of four 15 MW(t) methanation trains. Each train is connected to a pipeline and receives synthesis gas (syngas) from a High Temperature Gas-Cooled Reactor Reforming (HTGR-R) plant. Conversion of the syngas to methane and water releases exothermic heat which is used to generate steam. Syngas is received at the Methanation Plant at a temperature of 80 0 F and 900 psia. One adiabatic catalytic reactor and one isothermal catalytic reactor, in each methanation train, converts the syngas to 92.2% (dry bases) methane. Methane and condensate are returned at temperatures of 100 to 125 0 F and at pressures of 860 to 870 psia to the HTGR-R plant for the reproduction of syngas

  10. CW 100MW microwave power transfer in space

    International Nuclear Information System (INIS)

    Takayama, K.; Hiramatsu, S.; Shiho, M.

    1991-01-01

    A linear multistage MFEL has been considered as a possible power source for future linear colliders; however, the single-stage experiment cannot be straightforwardly extrapolated to the multistage MFEL. Nevertheless, extensive theoretical and computational studies have demonstrated the feasibility of multistaging. Based on the authors current understanding of the MFEL, they developed the idea of a circular microwave power station (MPS) driven with a single high current beam where many FEL stages are placed along a circle and the remarkable high power of microwave (mw) is generated at each stage. The total power produced is linearly proportional to the number of FEL stages. This huge mw power can be emitted from a large parabola antenna; propagates in space and can be received by a receiver such as parabola antenna or rectenna

  11. Non-polluting steam generators with fluidized-bed furnaces

    Energy Technology Data Exchange (ETDEWEB)

    Brandes, H [Deutsche Babcock A.G., Oberhausen (Germany, F.R.)

    1979-07-01

    The author reports on a 35 MW steam generator with hard coal fluidized-bed furnace a planned 35 MW steam generator with flotation-dirt fluidized-bed furnace, and on planned steam generators for fluidized-bed firing of hard coal up to a steam power of about 200 MW.

  12. Automatic crude oil handling through a pressurized system from the wellhead to the refinery

    Energy Technology Data Exchange (ETDEWEB)

    Davis, W.B.; Truman, P.W.; Groeneman, A.R.

    1967-01-01

    Production from 51 wells completed in the 3 unitized formations of the Lost Soldier Field, Sweetwater Co., Wyoming, is brought to a central point through individual flow lines. Here the fluids are directed through separate automatic well testing and oil treating facilities, one for each formation. After separation of oil, gas and water, the oil goes to pressurized surge tanks and then to lease automatic custody transfer units. There is one surge tank and one LACT unit for each formation. The oil is automatically transferred to the Sinclair Pipe Line Co. for delivery to Sinclair's refinery at Sinclair, Wyoming, through a closed pipe line system. A central console provides: (1) supervisory control from the wellheads through the LACT units, (2) well test and production data logging, and (3) monitoring by activating alarms for abnormal conditions of flow, liquid levels, temperatures and pressures.

  13. Target station design for a 1 MW pulsed spallation neutron source

    International Nuclear Information System (INIS)

    Russell, G.J.; Baker, G.D.; Brewton, R.J.

    1993-01-01

    Target stations are vital components of the 1 MW, next generation spallation neutron source proposed for LANSCE. By and large, target stations design determines the overall performance of the facility. Many traditional concepts will probably have to be rethought, and many new concepts will have to be put forward to meet the 1 MW challenge. This article gives a brief overview of the proposed neutron spallation source from the target station viewpoint, as well as the general philosophy adopted for the design of the LANSCE-II target stations. Some of the saliant concepts and features envisioned for LANSCE-II are briefly described

  14. Aeroelastic Optimization of MW Wind Turbines

    DEFF Research Database (Denmark)

    Hansen, Morten Hartvig; Zahle, Frederik

    This report contains the results from the Energy Development and Demonstration Project “Aeroelastic Optimization of MW wind turbine” (AeroOpt). The project has had the following five Work Packages: 1. Geometric non-linear, anisotropic beamelement forHAWC2 2. Closed-loop eigenvalue analysis...... of controlled wind turbines 3. Resonant wave excitation of lateral tower bending modes 4. Development of next generation aerodynamic design tools 5. Advanced design and verification of airfoils The purposes of these Work Packages are briefly described in the Preface and a summary of the results are given...

  15. Multilevel converters for 10 MW Wind Turbines

    DEFF Research Database (Denmark)

    Ma, Ke; Blaabjerg, Frede

    2011-01-01

    Several promising multi-level converter configurations for 10 MW Wind Turbines both with direct drive and one-stage gear box drive using Permanent Magnet Synchronous Generator (PMSG) are proposed, designed and compared. Reliability is a crucial indicator for large scale wind power converters...... that the three-level and five-level H-bridge converter topologies both have potential to achieve improved thermal performances compared to the three-level Neutral-Point-Clamped converter topology in the wind power application....

  16. The Winfrith 9MW heat transfer rig

    International Nuclear Information System (INIS)

    Obertelli, J.D.

    1976-01-01

    The Winfrith 9MW Rig is used for studying heat transfer and flow resistance in a variety of test sections at system pressures up to 68 bar. The basic rig and its instrumentation are discussed together with the characteristics of the test section design. The rig has been used in studies involving the full scale simulation of Steam Generating Heavy Water (SGHW) fuel assemblies and the paper discusses the measurements made in this type of study. (author)

  17. 12MW: final report; Wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Hasager, C.; Pena, A.; Mikkelsen, T.; Gryning, S.-E.; Courtney, M.; Soerensen, Paul B. (DONG energy)

    2009-06-15

    '12MW: final report' is for the project with the full title '12 MW wind turbines: the scientific basis for their operation at 70 to 270 m height offshore' that had the goal to experimentally investigate the wind and turbulence characteristics between 70 and 270 m above sea level and thereby establish the scientific basis relevant for the next generation of huge 12 MW wind turbines operating offshore. The project started 1st October 2005 and ended 31st March 2009. Firstly was conducted a 6-month experiment at the Horns Rev offshore wind farm deploying a lidar and a sodar on the transformer platform. The observed data were successfully compared to offshore mast data and the wind profile was extended 100 m above previous levels observed in this offshore environment. The wind and turbulence was observed up to 160m above mean sea level. A new normalization was introduced to group the wind profiles into stability groups with variable roughness. Secondly two experiments were conducted at Hoevsoere at the North Sea coast in Jutland. Again the wind profile was extended far beyond previous observed levels, up to 300 m above ground. The analysis showed that the profiles extended far beyond the surface layer and therefore surface layer scale alone could not described the profiles well. In addition the boundary layer height has to be used for the scaling. The boundary layer height was observed by an aerosol lidar at Hoevsoere. The results are published widely, please see the list of publications. (au)

  18. TRIGA 14 MW Research Reactor Status and Utilization

    International Nuclear Information System (INIS)

    Barbos, D.; Ciocanescu, M.; Paunoiu, C.

    2016-01-01

    Institute for Nuclear Research is the owner of the largest family TRIGA research reactor, TRIGA14 MW research reactor. TRIGA14 MW reactor was designed to be operated with HEU nuclear fuel but now the reactor core was fully converted to LEU nuclear fuel. The full conversion of the core was a necessary step to ensure the continuous operation of the reactor. The core conversion took place gradually, using fuel manufactured in different batches by two qualified suppliers based on the same well qualified technology for TRIGA fuel, including some variability which might lead to a peculiar behaviour under specific conditions of reactor utilization. After the completion of the conversion a modernization program for the reactor systems was initiated in order to achieve two main objectives: safe operation of the reactor and reactor utilization in a competitive environment to satisfy the current and future demands and requirements. The 14 MW TRIGA research reactor operated by the Institute for Nuclear Research in Pitesti, Romania, is a relatively new reactor, commissioned 37 years ago. It is expected to operate for another 15-20 years, sustaining new fuel and testing of materials for future generations of power reactors, supporting radioisotopes production through the development of more efficient new technologies, sustaining research or enhanced safety, extended burn up and verification of new developments concerning nuclear power plants life extension, to sustain neutron application in physics research, thus becoming a centre for instruction and training in the near future. A main objective of the TRIGA14MW research reactor is the testing of nuclear fuel and nuclear material. The TRIGA 14 MW reactor is used for medical and industrial radioisotopes production ( 131 I, 125 I, 192 Ir etc.) and a method for 99 Mo- 99 Tc production from fission is under development. For nuclear materials properties investigation, neutron radiography methods have been developed in the INR. The

  19. 1st DeepWind 5 MW Baseline design

    DEFF Research Database (Denmark)

    Schmidt Paulsen, Uwe; Vita, Luca; Aagaard Madsen, Helge

    2012-01-01

    The first 5MW baseline design of the DeepWind concept is presented for a Darrieus type floating wind turbine system for water depths of more than 150 m. This design will be used as design reference to test the next technological improvements of sub-component level, being based as much as possible...... trajectory on the water plane. The generator is placed at the bottom of the platform and uses 5MW direct drive technology.The conceptual design is evaluated with numerical simulations in the time domain using the aero-elastic code HAWC2. In order to investigate the concept, a double-disc blade element....... A site has been chosen for the floating turbine off Norway as representative for external conditions. The structure is verified according to an ultimate strength analysis, including loads from wind, waves and currents. The stability of the platform is investigated, considering the displacements...

  20. Heat loss analysis-based design of a 12 MW wind power generator module having an HTS flux pump exciter

    International Nuclear Information System (INIS)

    Sung, Hae-Jin; Go, Byeong-Soo; Jiang, Zhenan; Park, Minwon; Yu, In-Keun

    2016-01-01

    Highlights: • A large-scale HTS generator module has been suggested to avoid issues such as a huge vacuum vessel and higher reliability. • The challenging heat loss analysis of a large-scale HTS generator has successfully been performed, enabling the design of an optimal support structure having a total heat loss of 43 W/400 kW. • The results prove the potential of a large-scale superconducting wind-power generator to operate efficiently, and support further development of the concept. - Abstract: The development of an effective high-temperature superconducting (HTS) generator is currently a research focus; however, the reduction of heat loss of a large-scale HTS generator is a challenge. This study deals with a heat loss analysis-based design of a 12 MW wind power generator module having an HTS flux pump exciter. The generator module consists of an HTS rotor of the generator and an HTS flux pump exciter. The specifications of the module were described, and the detailed configuration of the module was illustrated. For the heat loss analysis of the module, the excitation loss of the flux pump exciter, eddy current loss of all of the structures in the module, radiation loss, and conduction loss of an HTS coil supporter were assessed using a 3D finite elements method program. In the case of the conduction loss, different types of the supporters were compared to find out the supporter of the lowest conduction loss in the module. The heat loss analysis results of the module were reflected in the design of the generator module and discussed in detail. The results will be applied to the design of large-scale superconducting generators for wind turbines including a cooling system.

  1. Heat loss analysis-based design of a 12 MW wind power generator module having an HTS flux pump exciter

    Energy Technology Data Exchange (ETDEWEB)

    Sung, Hae-Jin, E-mail: haejin0216@gmail.com [Changwon National University, 20 Changwondaehak-ro, Changwon, 641-773 (Korea, Republic of); Go, Byeong-Soo [Changwon National University, 20 Changwondaehak-ro, Changwon, 641-773 (Korea, Republic of); Jiang, Zhenan [Robinson Research Institute, Victoria University of Wellington, PO Box 33436 (New Zealand); Park, Minwon [Changwon National University, 20 Changwondaehak-ro, Changwon, 641-773 (Korea, Republic of); Yu, In-Keun, E-mail: yuik@changwon.ac.kr [Changwon National University, 20 Changwondaehak-ro, Changwon, 641-773 (Korea, Republic of)

    2016-11-15

    Highlights: • A large-scale HTS generator module has been suggested to avoid issues such as a huge vacuum vessel and higher reliability. • The challenging heat loss analysis of a large-scale HTS generator has successfully been performed, enabling the design of an optimal support structure having a total heat loss of 43 W/400 kW. • The results prove the potential of a large-scale superconducting wind-power generator to operate efficiently, and support further development of the concept. - Abstract: The development of an effective high-temperature superconducting (HTS) generator is currently a research focus; however, the reduction of heat loss of a large-scale HTS generator is a challenge. This study deals with a heat loss analysis-based design of a 12 MW wind power generator module having an HTS flux pump exciter. The generator module consists of an HTS rotor of the generator and an HTS flux pump exciter. The specifications of the module were described, and the detailed configuration of the module was illustrated. For the heat loss analysis of the module, the excitation loss of the flux pump exciter, eddy current loss of all of the structures in the module, radiation loss, and conduction loss of an HTS coil supporter were assessed using a 3D finite elements method program. In the case of the conduction loss, different types of the supporters were compared to find out the supporter of the lowest conduction loss in the module. The heat loss analysis results of the module were reflected in the design of the generator module and discussed in detail. The results will be applied to the design of large-scale superconducting generators for wind turbines including a cooling system.

  2. 12MW Horns Rev experiment[Wind farm

    Energy Technology Data Exchange (ETDEWEB)

    Hasager, C.B.; Pena, A; Mikkelsen, T.; Courtney, M.; Antoniou, I.; Gryning, S.-E.; Hansen, P. [Risoe National Lab., DTU, Wind Energy Dept. (Denmark); Soerensen, P.B. [DONG Energy (Denmark)

    2007-10-15

    The 12MW project with the full title '12 MW wind turbines: the scientific basis for their operation at 70 to 270 m height offshore' has the goal to experimentally investigate the wind and turbulence characteristics between 70 and 270 m above sea level and thereby establish the scientific basis relevant for the next generation of huge 12 MW wind turbines operating offshore. The report describes the experimental campaign at the Horns Rev offshore wind farm at which observations from Doppler Laser LIDAR and SODAR were collected from 3 May to 24 October 2006. The challenges for mounting and operating the instruments on the transformer platform at Horns Rev were overcome by a close collaboration between DONG energy and Risoe National Laboratory DTU. The site is presented. In particular, three tall offshore meteorological masts, up to 70 m tall, provided a useful source of meteorological data for comparison to the remotely sensed wind and turbulence observations. The comparison showed high correlation. The LIDAR and SODAR wind and turbulence observations were collected far beyond the height of the masts (up to 160 m above sea level) and the extended profiles were compared to the logarithmic wind profile. Further studies on this part of the work are on-going. Technical detail on LIDAR and SODAR are provided as well as theoretical work on turbulence and atmospheric boundary layer flow. Selected results from the experimental campaign are reported. (au)

  3. Effects of Armature Winding Segmentation with Multiple Converters on the Short Circuit Torque of 10-MW Superconducting Wind Turbine Generators

    DEFF Research Database (Denmark)

    Liu, Dong; Polinder, Henk; Abrahamsen, Asger Bech

    2017-01-01

    Superconducting synchronous generators (SCSGs) are drawing more attention in large direct-drive wind turbine applications. Despite low weight and compactness, the short circuit torque of an SCSG may be too high for wind turbine constructions due to a large magnetic air gap of an SCSG. This paper...... aims at assessing the effects of armature winding segmentation on reducing the short circuit torque of 10-MW SCSGs. A concept of armature winding segmentation with multiple power electronic converters is presented. Four SCSG designs using different topologies are examined. Results show that armature...... winding segmentation effectively reduce the short circuit torque in all the four SCSG designs when one segment is shorted at the terminal....

  4. The DAN-AERO MW Experiments

    DEFF Research Database (Denmark)

    Aagaard Madsen, Helge; Bak, Christian; Schmidt Paulsen, Uwe

    a number of coordinated, innovative measurements on full scale MW size rotors as well as on airfoils for MW size turbines in wind tunnels. Shear and turbulence inflow characteristics were measured on a Siemens 3.6 MW turbine with a five hole pitot tube. Pressure and turbulent inflow characteristics were...... on the blade was further instrumented with around 50 microphones for high frequency surface pressure measurements. The surface pressure measurements have been correlated with inflow measurements from four five hole pitot tubes and two sensors for measuring the high frequency (50 Hz to10 kHz) contents...

  5. Design Tool for Direct Drive Wind Turbine Generators

    DEFF Research Database (Denmark)

    Leban, Krisztina Monika

    . A comparison of the selected machine types in view of up-scaling to 20 [MW] was performed. As an example fitness criterion, the use of active materials for the generators was considered. Based on this, suggestions for 20 [MW] generators were made. The results are discussed and future work, directions......The current work offers a comparison of the proposed machine geometries for 6 [MW] direct drive wind generator candidates with the prospective of up scaling to 20MW. The suggestions are based on a design tool especially built for this investigation. The in-built flexibility of the design tool gives...

  6. Hypothetical accident scenario analyses for a 250-MW(t) modular high temperature gas-cooled reactor

    International Nuclear Information System (INIS)

    Harrington, R.M.; Ball, S.J.; Cleveland, J.C.

    1985-11-01

    This paper describes calculations performed to characterize the inherent safety of a 250-MW(t), 100-MW(e), pebble bed modular high temperature gas-cooled reactor (HTGR) design with vertical in-line arrangement (i.e., upflow core with steam generators directly above the core). A variety of postulated accident sequences involving combinations of loss of forced primary coolant (helium) circulation, loss of primary coolant pressurization, and loss of heat sink were studied and were discussed

  7. Superconducting wind turbine generators

    International Nuclear Information System (INIS)

    Abrahamsen, A B; Seiler, E; Zirngibl, T; Andersen, N H; Mijatovic, N; Traeholt, C; Pedersen, N F; Oestergaard, J; Noergaard, P B

    2010-01-01

    We have examined the potential of 10 MW superconducting direct drive generators to enter the European offshore wind power market and estimated that the production of about 1200 superconducting turbines until 2030 would correspond to 10% of the EU offshore market. The expected properties of future offshore turbines of 8 and 10 MW have been determined from an up-scaling of an existing 5 MW turbine and the necessary properties of the superconducting drive train are discussed. We have found that the absence of the gear box is the main benefit and the reduced weight and size is secondary. However, the main challenge of the superconducting direct drive technology is to prove that the reliability is superior to the alternative drive trains based on gearboxes or permanent magnets. A strategy of successive testing of superconducting direct drive trains in real wind turbines of 10 kW, 100 kW, 1 MW and 10 MW is suggested to secure the accumulation of reliability experience. Finally, the quantities of high temperature superconducting tape needed for a 10 kW and an extreme high field 10 MW generator are found to be 7.5 km and 1500 km, respectively. A more realistic estimate is 200-300 km of tape per 10 MW generator and it is concluded that the present production capacity of coated conductors must be increased by a factor of 36 by 2020, resulting in a ten times lower price of the tape in order to reach a realistic price level for the superconducting drive train.

  8. Design of 100 MW LNG Floating Barge Power Plant

    Directory of Open Access Journals (Sweden)

    I Made Ariana

    2017-06-01

    Full Text Available Floating bargepower plant able to supply amount of electricity to undeveloped island in Indonesia. In this research, the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulation floating bargepower plant able to supply amount of electricity to undeveloped island in Indonesia. In this research, the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulation Normal 0 false false false EN-US X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;}

  9. Heat wave generates questions about Ontario's generation capacity

    International Nuclear Information System (INIS)

    Horne, D.

    2005-01-01

    Concerns regarding Ontario's power generation capacity were raised following a major blackout which occurred in August 2003. Power demand reached 26,170 MW during the weeks leading to the blackout, forcing the Independent Electricity System Operator (IESO) to ask residents to reduce electricity use during the day. The grid operator had also issued a forecast that Toronto could face rolling blackouts during times of heavy power demand. Ontario power consumption records were set in June and July of 2003 due to a heat wave, with hourly demand exceeding 25,000 MW on 53 occasions. Ontario was forced to import up to 3,400 MW (13 per cent of its power needs) from neighbouring provinces and the United States. During that period, the price of power had risen sharply to over 30 cents a kilowatt hour, although household consumers were still charged in the 5 to 10 cent range per kilowatt hour. However, it was noted that taxpayers will eventually bear the cost of importing power. The IESO noted that importing electricity is cheaper than the generation available in Ontario and that it is more economical to import, based on the market clearing price of all generators. In 2004, the IESO purchased 6 per cent of their electricity from the United States. That figure is expected to increase for 2005. Ontario generators produced 26.9 million MWh more in the summer of 2005 than during the same period in 2004 to meet electricity demand levels. It was noted that although importing power presently meets peak demand, the IESO agrees there is a need for new generation within Ontario. In addition to restarting Ontario's Pickering and Bruce nuclear facilities, more than 3,300 MW of new gas-fired generation is under construction or approved, and more than 9,000 MW are in various stages of approval. This paper discussed the effect of high energy costs on industry and Ontario's ability to meet future electricity demand in comparison to neighbouring jurisdictions. Issues regarding grid maintenance

  10. Power quality issues of 3MW direct-driven PMSG wind turbine

    OpenAIRE

    Ahmed, IA; Zobaa, AF; Taylor, GA

    2015-01-01

    This paper presents power quality issues of a grid connected wind generation system with a MW-class direct-driven permanent magnet synchronous generator (PMSG). A variable speed wind turbine model was simulated and developed with the simulation tool of PSCAD/EMTDC. The model includes a wind turbine with one mass-model drive train model, a PMSG model and a full-scale voltage source back to back PWM converter. The converter controller model is employed in the dq-synchronous rotating reference f...

  11. DANAERO MW: Final Report

    DEFF Research Database (Denmark)

    Troldborg, Niels; Bak, Christian; Aagaard Madsen, Helge

    This report describes the results of the EUDP funded DANAERO MW II project carried out by DTU Wind Energy (formerly Risø DTU) and the industrial partners, LM Wind Power, Vestas Wind Systems A/S and Siemens Wind Power. An overview of the data available from the project as well as the results from...... analysis of the data is given with the main objective to explore in detail the influence of atmospheric and wake turbulence on MW turbine performance, loading and stability. Finally, validation and demonstration of simulation codes are carried out....

  12. Update on the enhancement of Florida power and light 400 MW steam generator program

    International Nuclear Information System (INIS)

    Mazzarell, G.R.; Chang, P.S.

    1991-01-01

    Florida Power and Light has nine (9) 400 MW units, designed and installed by Foster Wheeler in the 1960's. These fossil units were designed as base loaded units with oil firing. However, natural gas capability was added and for more than seven years these units have been in a cycling mode of operation. The availability of these units has deteriorated over the same time period. This paper reports that Florida Power and Light instituted an enhancement program for improving the availability redundancy of all their fossil fired units. The 400 MW units were the main contributors to the system forced outage rate. Each design and operating problem of these units was studied in detail and the root causes of each problem were identified. The first two (2) units, Port Everglades units No. 3 and 4 have been modified and returned to service. Testing of these two (2) units with respect to performance guarantees and the effectiveness of each of the individual modifications, has been completed. The first unit modified, PPE No. 3 was returned to service May 1989, PPE No. 4 in May of 1990. Both units have performed satisfactorily during subsequent operation. Cape Canaveral Unit No. 2 is modified and scheduled to be returned to service in May 1991

  13. 1000 MW steam turbine for Temelin nuclear power station

    International Nuclear Information System (INIS)

    Drahy, J.

    1992-01-01

    Before the end 1991 the delivery was completed of the main parts (3 low-pressure sections and 1 high-pressure section, all of double-flow design) of the first full-speed (3000 r.p.m.) 1000 MW steam turbine for saturated admission steam for the Temelin nuclear power plant. Description of the turbine design and of new technologies and tools used in the manufacture are given. Basic technical parameters of the steam turbine are as follows: maximum output of steam generators 6060 th -1 ; maximum steam flow into turbine 5494.7 th -1 ; output of turbo-set 1024 MW; steam conditions before the turbine inlet: pressure 5.8 MPa, temperature 273.3 degC, steam wetness 0.5%; nominal temperature of cooling water 21 degC; temperature of feed water 220.8 degC; maximum consumption of heat from turbine for heating at 3-stage heating of heating water 60/150 degC. (Z.S.) 7 figs., 2 refs

  14. Evaluation and Ranking of Geothermal Resources for Electrical Generation or Electrical Offset in Idaho, Montana, Oregon and Washington. Volume II.

    Energy Technology Data Exchange (ETDEWEB)

    Bloomquist, R. Gordon

    1985-06-01

    This volume contains appendices on: (1) resource assessment - electrical generation computer results; (2) resource assessment summary - direct use computer results; (3) electrical generation (high temperature) resource assessment computer program listing; (4) direct utilization (low temperature) resource assessment computer program listing; (5) electrical generation computer program CENTPLANT and related documentation; (6) electrical generation computer program WELLHEAD and related documentation; (7) direct utilization computer program HEATPLAN and related documentation; (8) electrical generation ranking computer program GEORANK and related documentation; (9) direct utilization ranking computer program GEORANK and related documentation; and (10) life cycle cost analysis computer program and related documentation. (ACR)

  15. Design Optimization of a 5 MW Floating Offshore Vertical-axis Wind Turbine

    NARCIS (Netherlands)

    Paulsen, Uwe Schmidt; Madsen, Helge Aagård; Hattel, Jesper Henri; Baran, Ismet; Nielsen, Per Hørlyck

    2013-01-01

    This paper outlines results of a proposed layout of a light 2-bladed rotor, with a driving torque constraint matching the generator design, and shows details of the pultruded blade – and rotor geometry. In comparison with the 1st baseline design of a 5 MW VAWT concept this present development

  16. Aeroelastic optimization of MW wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Hartvig Hansen, M.; Zahle, F.

    2011-12-15

    This report contains the results from the Energy Development and Demonstration Project ''Aeroelastic Optimization of MW wind turbine'' (AeroOpt). The project has had the following five Work Packages: 1. Geometric non-linear, anisotropic beam element for HAWC2. 2. Closed-loop eigenvalue analysis of controlled wind turbines. 3. Resonant wave excitation of lateral tower bending modes. 4. Development of next generation aerodynamic design tools. 5. Advanced design and verification of airfoils. The purposes of these Work Packages are briefly described in the Preface and a summary of the results are given in Section 2. Thereafter, the results from each Work Package are described in eight subsequent chapters. (Author)

  17. Power Devices Loading in Multilevel Converters for 10 MW Wind Turbines

    DEFF Research Database (Denmark)

    Ma, Ke; Blaabjerg, Frede; Xu, Dehong

    2011-01-01

    Several promising multilevel converter solutions for 10 MW wind turbines using permanent magnet synchronous generators are proposed, designed and compared both with one-stage gear-box drive and direct drive systems. The current and loss distributions, as well as the utilization of power devices......-level NeutralPoint-Clamped topology with both the direct-drive and one-stage gear box drive systems....

  18. Introduction guide book for wind power generation; Furyoku hatsuden donyu guide book

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This paper arranges essential items for introduction of wind power generation to local governments. Natural wind power energy which is free from emission of atmospheric pollutants such as CO2 and probably profitable, is leading regenerative energy among several new energies, and its rapid diffusion is expected. At the end of 1995, a wind power generation facility capacity amounts to 4900MW in the world, 1770MW in USA, 1140MW in Germany, 630MW in Denmark, 550MW in India, and 250MW in the Netherlands. In Japan, its introduction to local governments is in progress with preparation of a purchase system of surplus electric power and a system interconnection guideline. A total facility capacity reached 10MW in 1996, and is scheduled to reach 150MW in fiscal 2010. NEDO`s wind characteristic map of Japan shows many promising areas for power generation. Since these information is not yet well known, the following are summarized: the present state, features of wind condition, power generation systems, application cases, an approach to survey research, construction, maintenance and related laws, and a subsidy system. 31 refs., 48 figs., 40 tabs.

  19. Large superconducting wind turbine generators

    DEFF Research Database (Denmark)

    Abrahamsen, Asger Bech; Magnusson, Niklas; Jensen, Bogi Bech

    2012-01-01

    and the rotation speed is lowered in order to limit the tip speed of the blades. The ability of superconducting materials to carry high current densities with very small losses might facilitate a new class of generators operating with an air gap flux density considerably higher than conventional generators...... and thereby having a smaller size and weight [1, 2]. A 5 MW superconducting wind turbine generator forms the basics for the feasibility considerations, particularly for the YBCO and MgB2 superconductors entering the commercial market. Initial results indicate that a 5 MW generator with an active weight of 34...

  20. Model for economical analysis of oil and gas deepwater production concepts : Comparisons of life cycle cost of subsea production systems vs. floating structures with dry wellheads.

    OpenAIRE

    Romero Mata, Omar

    2010-01-01

    Master's thesis in Offshore technology The scope of the work was to create a model that will allow the comparison of Life Cycle Costs (LCC) for subsea production systems and floating structures with dry wellheads for the Mexican territorial waters of the Gulf of Mexico. To give validity to the model, an empirical comparison on the resulting recovery factor based on data of the US Gulf of Mexico was included. This comparison is intended to answer ¿Is there a significant diffe...

  1. Future aspects for liquid metal heated steam generators

    International Nuclear Information System (INIS)

    Jansing, W.; Ratzel, W.; Vinzens, K.

    1975-01-01

    The present status of steam generators is shown. The experience gained until now is expressed in form of basic points. The most important design criteria for steam generator systems are outlined. On the basis of these design criteria, two possible steam generator concepts are shown. Costs in relationship to the repair concepts of two modular steam generators (thermal output 156 and 625 MW) and a pool design of 625 MW are compared. (author)

  2. Future aspects for liquid metal heated steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Jansing, W; Ratzel, W; Vinzens, K

    1975-07-01

    The present status of steam generators is shown. The experience gained until now is expressed in form of basic points. The most important design criteria for steam generator systems are outlined. On the basis of these design criteria, two possible steam generator concepts are shown. Costs in relationship to the repair concepts of two modular steam generators (thermal output 156 and 625 MW) and a pool design of 625 MW are compared. (author)

  3. Green-diode-pumped femtosecond Ti:Sapphire laser with up to 450 mW average power.

    Science.gov (United States)

    Gürel, K; Wittwer, V J; Hoffmann, M; Saraceno, C J; Hakobyan, S; Resan, B; Rohrbacher, A; Weingarten, K; Schilt, S; Südmeyer, T

    2015-11-16

    We investigate power-scaling of green-diode-pumped Ti:Sapphire lasers in continuous-wave (CW) and mode-locked operation. In a first configuration with a total pump power of up to 2 W incident onto the crystal, we achieved a CW power of up to 440 mW and self-starting mode-locking with up to 200 mW average power in 68-fs pulses using semiconductor saturable absorber mirror (SESAM) as saturable absorber. In a second configuration with up to 3 W of pump power incident onto the crystal, we achieved up to 650 mW in CW operation and up to 450 mW in 58-fs pulses using Kerr-lens mode-locking (KLM). The shortest pulse duration was 39 fs, which was achieved at 350 mW average power using KLM. The mode-locked laser generates a pulse train at repetition rates around 400 MHz. No complex cooling system is required: neither the SESAM nor the Ti:Sapphire crystal is actively cooled, only air cooling is applied to the pump diodes using a small fan. Because of mass production for laser displays, we expect that prices for green laser diodes will become very favorable in the near future, opening the door for low-cost Ti:Sapphire lasers. This will be highly attractive for potential mass applications such as biomedical imaging and sensing.

  4. Fuzzy logic based power management strategy of a multi-MW doubly-fed induction generator wind turbine with battery and ultracapacitor

    International Nuclear Information System (INIS)

    Sarrias-Mena, Raúl; Fernández-Ramírez, Luis M.; García-Vázquez, Carlos Andrés; Jurado, Francisco

    2014-01-01

    Integrating energy storage systems (ESS) with wind turbines results to be an interesting option for improving the grid integration capability of wind energy. This paper presents and evaluates a wind hybrid system consisting of a 1.5 MW doubly-fed induction generator (DFIG) wind turbine and double battery-ultracapacitor ESS. Commercially available components are used in this wind hybrid system. A novel supervisory control system (SCS) is designed and implemented, which is responsible for setting the active and reactive power references for each component of the hybrid system. A fuzzy logic controller, taking into account the grid demand, power generation prediction, actual DFIG power generation and state-of-charge (SOC) of the ESSs, sets the active power references. The reactive power references are proportionally delivered to each element regarding their current limitations in the SCS. The appropriate control of the power converters allows each power source to achieve the operation defined by the SCS. The wind hybrid system and SCS are assessed by simulation under wind fluctuations, grid demand changes, and grid disturbances. Results show an improved performance in the overall response of the system with the implementation of the SCS. - Highlights: • We study a wind hybrid system based on DFIG wind turbine, battery and ultracapacitor. • A novel supervisory control system based on fuzzy logic is designed and implemented. • The control improves the system response under different operating conditions

  5. The status of safeguarding 600 MW(e) CANDU reactors

    International Nuclear Information System (INIS)

    Von Baeckmann, A.; Rundquist, D.E.; Pushkarjov, V.; Smith, R.M.; Zarecki, C.W.

    1982-09-01

    There has been extensive work in the development of CANDU safeguards since the last International Conference on Nuclear Power, and this has resulted in the development of improved equipment for the safeguards system now being installed in the 600 MW(e) CANDU generating stations. The overall system is designed to improve on the existing IAEA safeguards and to provide adequate coverage for each plausible nuclear material diversion route. There is sufficient sensitivity and redundancy to enable the timely detection of the possible diversion of significant quantities of nuclear material

  6. Nuclear renaissance in Asia. Energy security and development of nuclear power generation system

    International Nuclear Information System (INIS)

    Nakasugi, Hideo

    2009-01-01

    The energy policy and strategy of development of nuclear power generation system of China, India and Korea are stated on the basis of use of light water reactors (LWRs). The conditions of power generation and introduction plans of nuclear energy of other Asian countries such as Vietnam, Thailand, Indonesia, Malaysia and Philippines are described. The power plant capacity of China increased from 50,500 MW in 2004, to 65,000 MW in 2005, and the target value is 40,000 MW of operating nuclear plants and 18,000 MW in building in 2020. China is lagging behind in peaceful use of nuclear energy technologies. A plan for the reform of nuclear industry and nuclear power generation projects of China are summarized. Total power plant capacity of India is 145,000 MW, but the nuclear plant capacity is 4,120 MW in 2008 and 63,000 MW of the target in 2032. Development of nuclear power, circumstance, and cooperation with other countries' industries are explained. 17,716 MW of nuclear power is in operation, 6,800 MW in building and 2,800 MW in the planning stage in Korea. History of development of national reactors and the subjects of development of the fourth generation reactor of Korea are stated. Management system of nuclear power plants in China, technical bases of nuclear power plants in China, development system of nuclear power generation in India, the conditions of power production of Korea in 2008, the capacity factor of Korea, Japan and world from 1998 to 2008, and comparison of nuclear industries in China, India and Korea are illustrated. (S.Y.)

  7. The DIII-D 3 MW, 110 GHz ECH System

    International Nuclear Information System (INIS)

    Callis, R.W.; Lohr, J.; Ponce, D.; O'Neill, R.C.; Prater, R.; Luce, T.C.

    1999-01-01

    Three 110 GHz gyrotrons with nominal output power of 1 MW each have been installed and are operational on the DIII-D tokamak. One gyrotron is built by Gycom and has a nominal rating of 1 MW and a 2 s pulse length, with the pulse length being determined by the maximum temperature allowed on the edge cooled Boron Nitride window. The second and third gyrotrons were built by Communications and Power Industries (CPI). The first CPI gyrotron uses a double disc FC-75 cooled sapphire window which has a pulse length rating of 0.8 s at 1 MW, 2s at 0.5 MW and 10s at 0.35 MW. The second CPI gyrotron, utilizes a single disc chemical-vapor-deposition diamond window, that employs water cooling around the edge of the disc. Calculation predict that the diamond window should be capable of full 1 MW cw operation. All gyrotrons are connected to the tokamak by a low-loss-windowless evacuated transmission line using circular corrugated waveguide for propagation in the HEl 1 mode. Each waveguide system incorporates a two mirror launcher which can steer the rf beam poloidally from the center to the outer edge of the plasma. Central current drive experiments with the two gyrotrons with 1.5 MW of injected power drove about 0.17 MA. Results from using the three gyrotron systems will be reported as well as the plans to upgrade the system to 6 MW

  8. Wet steam wetness measurement in a 10 MW steam turbine

    Directory of Open Access Journals (Sweden)

    Kolovratník Michal

    2014-03-01

    Full Text Available The aim of this paper is to introduce a new design of the extinction probes developed for wet steam wetness measurement in steam turbines. This new generation of small sized extinction probes was developed at CTU in Prague. A data processing technique is presented together with yielded examples of the wetness distribution along the last blade of a 10MW steam turbine. The experimental measurement was done in cooperation with Doosan Škoda Power s.r.o.

  9. Multi-technology control centre to integrate 460 MW renewables

    International Nuclear Information System (INIS)

    2016-01-01

    The new RWE Innogy Aersa Control Centre that has been certified to act as an interface with CECRE (the Renewable Energy Control Centre) since February 2015, connects RWE’s 20 renewable energy facilities with REE, the Spanish Electricity Grid. As a result, it ensures that wind farms, in addition to hydropower and solar plants, can inject the energy generated by its 460 MW installed safely and with no penalties. Green Eagle Solutions, a provider of software solutions for renewable energy companies, has collaborated with RWE in the development of this Control Centre, meeting the high standards of quality and safety required by RWE. This centre uses CompactSCADA® technology to integrate power generation facilities that need to be integrated in a Control Centre to communicate with REE’s CECRE. (Author)

  10. Integration of A Solid Oxide Fuel Cell into A 10 MW Gas Turbine Power Plant

    Directory of Open Access Journals (Sweden)

    Denver F. Cheddie

    2010-04-01

    Full Text Available Power generation using gas turbine power plants operating on the Brayton cycle suffers from low efficiencies. In this work, a solid oxide fuel cell (SOFC is proposed for integration into a 10 MW gas turbine power plant, operating at 30% efficiency. The SOFC system utilizes four heat exchangers for heat recovery from both the turbine outlet and the fuel cell outlet to ensure a sufficiently high SOFC temperature. The power output of the hybrid plant is 37 MW at 66.2% efficiency. A thermo-economic model predicts a payback period of less than four years, based on future projected SOFC cost estimates.

  11. Preliminary design study of removable integral steam generator units of the multiple helically wound tube type for a 1250 MW(th) H.T.G.C. reactor

    International Nuclear Information System (INIS)

    Gilli, P.V.; Fritz, K.; Lippitsch, J.; Sandri, A.H.; Weiss, B.

    1965-11-01

    The possibilities of designing a multiple steam generator for a 1250 MW(th) High Temperature Gas-Cooled Reactor, consisting of 18 units which are able to pass through 5 ft diam. holes in the integral prestressed concrete pressure vessel are investigated. A lay-out and design with bundles of multi-start helical tubes is evolved, particular attention being paid to the questions of tube blanking and removal of the unit, and of selection of materials for superheater and reheater tubes. Thermal and stress calculations have been carried out, using the Waagner-Biro Computer Code ADURHELIX. (author)

  12. Wave Dragon MW

    DEFF Research Database (Denmark)

    Kofoed, Jens Peter; Frigaard, Peter

    Wave Dragon is a wave energy converter of the overtopping type. The device has been thoroughly tested on a 1:51.8 scale model in wave laboratories and a 1:4.5 scale model deployed in Nissum Bredning, a large inland waterway in Denmark. Based on the experience gained a full scale, multi MW prototype...

  13. Update on the modernization of 200 MW hard coal power plants in Poland

    International Nuclear Information System (INIS)

    Szabo, T.E.; Kopec, M.

    1993-01-01

    In June 1990, the Coalition of 200 MW, Hard Coal, Polish Power Plants representing an installed base of 10,240 MW, including 45 units of 200 MW, signed an agreement with the Westinghouse Electric Corporation, Power Generation Business Unit, based in Orlando, Florida, to cooperate on developing a modernization program for the 200 MW units. Program funding was obtained with The United States Trade Development Program (TDP) providing approximately 2/3 of the cost, and the balance provided by Westinghouse. On March 5, 1992, the Polish-American (51% Westinghouse, 49% Seven (7) Hard Coal Power Plants), Joint Venture Company, MODELPOL, Ltd. (Polish acronym for 'MODernizacja ELektrowni POLskich' or Modernization of Polish Power Plants) was established with the goal to implement not only technically but financially the recommendations of the Modernization Study. The mission given MODELPOL, Ltd. by their Polish-American Shareholders was to: develop the specific modernization programs for each hard coal power plant; assist in identifying and obtaining the financial resources required for implementation; and provide technological preventative maintenance services to improve unit availability. Within these aims was the target to reduce SO 2 , and particulate emissions. The first program is taking place at the Laziska Power Plant, followed by Rybnik. Further projects are in the planning stages. Finance is a constant problem, this should be eased by the restructuring of the power industry. Future programmes include connection to the European Community Power Grid. 5 figs

  14. Latest Results in SLAC 75-MW PPM Klystrons

    International Nuclear Information System (INIS)

    Sprehn, D.; Caryotakis, G.; Haase, A.; Jongewaard, E.; Laurent, L.; Pearson, C.; Phillips, R.

    2006-01-01

    75 MW X-band klystrons utilizing Periodic Permanent Magnet (PPM) focusing have been undergoing design, fabrication and testing at the Stanford Linear Accelerator Center (SLAC) for almost nine years. The klystron development has been geared toward realizing the necessary components for the construction of the Next Linear Collider (NLC). The PPM devices built to date which fit this class of operation consist of a variety of 50 MW and 75 MW devices constructed by SLAC, KEK (Tsukuba, Japan) and industry. All these tubes follow from the successful SLAC design of a 50 MW PPM klystron in 1996. In 2004 the latest two klystrons were constructed and tested with preliminary results reported at EPAC2004. The first of these two devices was tested to the full NLC specifications of 75 MW, 1.6 microseconds pulse length, and 120 Hz. This 14.4 kW average power operation came with a tube efficiency >50%. The most recent testing of these last two devices will be presented here. Design and manufacturing issues of the latest klystron, due to be tested by the Fall of 2005, are also discussed

  15. IHEP S-band 45 MW pulse power klystron development

    International Nuclear Information System (INIS)

    Dong Dong; Zhou Zusheng; Zhang Liang; Li Gangying; Tian Shuangmin

    2006-01-01

    S-band 45 MW pulse power klystron has been developed in the Institute of High Energy Physics (IHEP) for the Beijing Electron Positron Collider (BEPC) upgrade projects (BEPC-II). This new klystron has 5 cavities in its RF-beam interaction and single RF output window, and the RF output power is 45 MW at 310 kV, the gain is 50 dB, the efficiency 40%. The manufacturing, training and testing of a prototype klystron has been finished in IHEP and RF power 45 MW at 300 kV has been reached. The testing results show that all the parameters of the 45 MW klystron reach the design goal. (authors)

  16. Modeling and Simulation of a 12 MW Wind Farm

    Directory of Open Access Journals (Sweden)

    GROZA, V.

    2010-05-01

    Full Text Available The installation of wind turbines in power systems has developed rapidly through the last 20 years. In this paper a complete simulation model of a 6 x 2 MW wind turbines is presented using data from a wind farm installed in Denmark. A model of the wind turbine with cage-rotor induction generator is presented in details. A set of simulations are performed and they show that it is possible to simulate a complete wind farm from wind to the grid. The simulation tool can also be used to simulate bigger wind farms connected to the grid.

  17. Design and field operation of 1175 MW steam turbine for Ohi Nuclear Power Station

    International Nuclear Information System (INIS)

    Hirota, Yoshio; Nakagami, Yasuo; Fujii, Hisashi; Shibanai, Hirooki.

    1980-01-01

    Two 1175 MW steam turbine and generator units have been successfully in commercial operation since March 1979 and December 1979 respectively at Ohi Nuclear Power Station of the Kansai Electric Power Company. Those units, the largest in their respective outputs in Japan, have also such remarkable design features as two-stage reheat, nozzle governing turbine, water cooled generator stator and turbine-driven feedwater pumps. This paper covers design features and some topics of various pre-operational tests of the above-mentioned units. (author)

  18. Fiber Bragg Grating Temperature Sensors in a 6.5-MW Generator Exciter Bridge and the Development and Simulation of Its Thermal Model

    Directory of Open Access Journals (Sweden)

    Kleiton de Morais Sousa

    2014-09-01

    Full Text Available This work reports the thermal modeling and characterization of a thyristor. The thyristor is used in a 6.5-MW generator excitation bridge. Temperature measurements are performed using fiber Bragg grating (FBG sensors. These sensors have the benefits of being totally passive and immune to electromagnetic interference and also multiplexed in a single fiber. The thyristor thermal model consists of a second order equivalent electric circuit, and its power losses lead to an increase in temperature, while the losses are calculated on the basis of the excitation current in the generator. Six multiplexed FBGs are used to measure temperature and are embedded to avoid the effect of the strain sensitivity. The presented results show a relationship between field current and temperature oscillation and prove that this current can be used to determine the thermal model of a thyristor. The thermal model simulation presents an error of 1.5 °C, while the FBG used allows for the determination of the thermal behavior and the field current dependence. Since the temperature is a function of the field current, the corresponding simulation can be used to estimate the temperature in the thyristors.

  19. Fiber Bragg grating temperature sensors in a 6.5-MW generator exciter bridge and the development and simulation of its thermal model.

    Science.gov (United States)

    de Morais Sousa, Kleiton; Probst, Werner; Bortolotti, Fernando; Martelli, Cicero; da Silva, Jean Carlos Cardozo

    2014-09-05

    This work reports the thermal modeling and characterization of a thyristor. The thyristor is used in a 6.5-MW generator excitation bridge. Temperature measurements are performed using fiber Bragg grating (FBG) sensors. These sensors have the benefits of being totally passive and immune to electromagnetic interference and also multiplexed in a single fiber. The thyristor thermal model consists of a second order equivalent electric circuit, and its power losses lead to an increase in temperature, while the losses are calculated on the basis of the excitation current in the generator. Six multiplexed FBGs are used to measure temperature and are embedded to avoid the effect of the strain sensitivity. The presented results show a relationship between field current and temperature oscillation and prove that this current can be used to determine the thermal model of a thyristor. The thermal model simulation presents an error of 1.5 °C, while the FBG used allows for the determination of the thermal behavior and the field current dependence. Since the temperature is a function of the field current, the corresponding simulation can be used to estimate the temperature in the thyristors.

  20. Design considerations of a MW-scale, high-efficiency, industrial-use, ultraviolet FEL amplifier

    International Nuclear Information System (INIS)

    Pagani, C.; Saldin, E.L.; Schneidmiller, E.A.; Yurkov, M.V.

    2000-01-01

    Theoretical and experimental work in free electron laser (FEL) physics, and the physics of particle accelerators over the last 10 years has pointed to the possibility of the generation of MW-level optical beams with laser-like characteristics in the ultraviolet (UV) spectral range. The concept is based on generation of the radiation in the master oscillator-power FEL amplifier (MOPA) configuration. The FEL amplifier concept eliminates the need for an optical cavity. As a result, there are no thermal loading limitations to increase the average output power of this device up to the MW-level. The problem of a tunable master oscillator can be solved with available conventional quantum lasers. The use of a superconducting energy-recovery linac could produce a major, cost-effective facility with wall plug power to output optical power efficiency of about 20% that spans wavelengths from the visible to the deep ultraviolet regime. The stringent electron beam qualities required for UV FEL amplifier operation can be met with a conservative injector design (using a conventional thermionic gun and subharmonic bunchers) and the beam compression and linear acceleration technology, recently developed in connection with high-energy linear collider and X-ray FEL programs

  1. Magnetohydrodynamic (MHD) power generation

    International Nuclear Information System (INIS)

    Chandra, Avinash

    1980-01-01

    The concept of MHD power generation, principles of operation of the MHD generator, its design, types, MHD generator cycles, technological problems to be overcome, the current state of the art in USA and USSR are described. Progress of India's experimental 5 Mw water-gas fired open cycle MHD power generator project is reported in brief. (M.G.B.)

  2. Multi-technology control centre to integrate 460 MW renewables; Centro de control multitecnología para la integración de 460 MW renovables

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2016-07-01

    The new RWE Innogy Aersa Control Centre that has been certified to act as an interface with CECRE (the Renewable Energy Control Centre) since February 2015, connects RWE’s 20 renewable energy facilities with REE, the Spanish Electricity Grid. As a result, it ensures that wind farms, in addition to hydropower and solar plants, can inject the energy generated by its 460 MW installed safely and with no penalties. Green Eagle Solutions, a provider of software solutions for renewable energy companies, has collaborated with RWE in the development of this Control Centre, meeting the high standards of quality and safety required by RWE. This centre uses CompactSCADA® technology to integrate power generation facilities that need to be integrated in a Control Centre to communicate with REE’s CECRE. (Author)

  3. Impact of modulation strategies on power devices loading for 10 MW multilevel wind power converter

    DEFF Research Database (Denmark)

    Blaabjerg, Frede; Isidori, Andrea; Rossi, Fabio Mario

    2012-01-01

    This paper focuses on the control and modulation of a three-level Neutral Point Clamped (3L-NPC) back-to-back full scale converter for a 10 MW direct-drive wind turbine, equipped with a Permanent Magnet Synchronous Generator (PMSG). Emphasis is oriented towards the investigation of the power losses...

  4. Extrapolation of the Dutch 1 MW tunable free electron maser to a 5 MW ECRH source

    International Nuclear Information System (INIS)

    Caplan, M.; Nelson, S.; Kamin, G.; Antonsen, T. Levush, B.; Urbanus, W.; Tulupov, A.

    1995-01-01

    A Free Electron Maser (FEM) is now under construction at the FOM Institute (Rijnhuizen) Netherlands with the goal of producing 1 MW long pulse to CW microwave output in the range 130 GHz to 250 GHz with wall plug efficiencies of 50% (Verhoeven, et al EC-9 Conference). An extrapolated version of this device is proposed which by scaling up the beam current, would produce microwave power levels of up to 5 MW CW in order to reduce the cost per watt and increase the power per module, thus providing the fusion community with a practical ECRH source

  5. Design and field operation of 1175 MW steam turbine for Ohi Nuclear Power Station

    International Nuclear Information System (INIS)

    Hirota, Y.; Nakagami, Y.; Fujii, H.; Shibanai, H.

    1980-01-01

    Two 1,175 MW steam turbine and generator units have been successfully in commercial operation since March 1979 and December 1979 respectively at Ohi Nuclear Power Station of the Kansai Electric Power Company. Those units, the largest in their respective outputs in Japan, have also such remarkable design features as two-stage reheat, nozzle governing turbine, water cooled generator stator and turbine-driven feedwater pumps. This paper covers design features and some topics of various pre-operational tests of the above-mentioned units. (author)

  6. Light Rotor: The 10-MW reference wind turbine

    DEFF Research Database (Denmark)

    Bak, Christian; Bitsche, Robert; Yde, Anders

    2012-01-01

    design show a rather well performing wind turbine both in terms of power and loads, but in the further work towards the final design the challenges in the control needs to be solved and the balance between power performance and loads and between structural performance and mass will be investigated......This paper describes the design of a rotor and a wind turbine for an artificial 10-MW wind turbine carried out in the Light Rotor project. The turbine called the Light Rotor 10-MW Reference Wind Turbine (LR10-MW RWT), is designed with existing methods and techniques and serves as a reference...... like the determination of the specific power and upscaling of the turbine. The design of Iteration #2 of the LR10-MW RWT is carried out in a sequence between aerodynamic rotor design, structural design and aero-servo-elastic design. Each of these topics is described. The results from the Iteration #2...

  7. Development of wind power generation in China

    International Nuclear Information System (INIS)

    Zhiquan, Y.; Yan, C.; Lijun, X.

    1995-01-01

    Present status and development of wind power generation in China is described in this paper. China is vast in territory with abundant wind resources. The exploitable wind energy in China is estimated up to 253,000 MW. At present, more than 150 thousand small WTGs of a total capacity of 17 MW are used to provide residential electricity uses in non-grid connected areas and 13 wind farms, with above 160 medium and large scale grid connected WTGs (50-500 kW) of a total capacity of 30 MW, have been constructed. At the same time, some progress has been made in the fields of nation-wide wind resource assessment, measurement technology of wind turbine performance, the assimilation of foreign wind turbine technology, grid connected WTG technology and the operation of wind farm etc. It is planned that the total installed capacity of WTGs will reach 1000 MW by the end of 2000. Wind power generation could be a part of electric power industry in China. (Author)

  8. Thermal analysis of multi-MW two-level wind power converter

    DEFF Research Database (Denmark)

    Zhou, Dao; Blaabjerg, Frede; Mogens, Lau

    2012-01-01

    In this paper, the multi-MW wind turbine of partial-scale and full-scale two-level power converter with DFIG and direct-drive PMSG are designed and compared in terms of their thermal performance. Simulations of different configurations regarding loss distribution and junction temperature...... in the power device in the whole range of wind speed are presented and analyzed. It is concluded that in both partial-scale and full-scale power converter the most thermal stressed power device in the generator-side converter will have higher mean junction temperature and larger junction temperature...... fluctuation compared to grid-side converter at the rated wind speed. Moreover, the thermal performance of the generator-side converter in the partial-scale power converter becomes crucial around the synchronous operating point and should be considered carefully....

  9. Generation and management of medical waste in Serbia: A review

    Directory of Open Access Journals (Sweden)

    Šerović Radmila M.

    2016-01-01

    Full Text Available This study presents generation, quantities and medical waste (MW management in Serbia. It represents assessment methods and total annual MW generation by categories. It was concluded that pharmaceutical (64% and infectious (32% MW production is the largest. According to available data, MW management in Serbia is currently at low level, except when it comes to infectious waste. Research proposed simpler treatment methods in existing autoclaves and complex methods (incineration and plasma-pyrolysis, as well as short-term and long-term solutions. Predicted MW growing amount requires existing capacity increase for processing and new solutions application. Installed autoclaves capacity could be increased by increasing working time, in order to avoid additional investment. However, treatment in autoclave is only suitable for infectious MW. For other medical waste, which main fractions are pharmaceutical and chemical waste, there is no infrastructure. As temporary solution, pharmaceutical waste is treated abroad which in longer period is not financially feasible. Considering that MW treatment in Serbia currently is based on health facilities network equipped with autoclaves, as central (CTF and local (LTF treatments facilities for infectious waste treatment, it is recommended additional capacity implementation for treatment of non-infectious waste to this network, with simultaneous management level optimization of whole MW.

  10. Generation and composition of medical wastes from private medical microbiology laboratories.

    Science.gov (United States)

    Komilis, Dimitrios; Makroleivaditis, Nikolaos; Nikolakopoulou, Eftychia

    2017-03-01

    A study on the generation rate and the composition of solid medical wastes (MW) produced by private medical microbiology laboratories (PMML) was conducted in Greece. The novelty of the work is that no such information exists in the literature for this type of laboratories worldwide. Seven laboratories were selected with capacities that ranged from 8 to 88 examinees per day. The study lasted 6months and daily recording of MW weights was done over 30days during that period. The rates were correlated to the number of examinees, examinations and personnel. Results indicated that on average 35% of the total MW was hazardous (infectious) medical wastes (IFMW). The IFMW generation rates ranged from 11.5 to 32.5g examinee -1 d -1 while an average value from all 7 labs was 19.6±9.6g examinee -1 d -1 or 2.27±1.11g examination -1 d -1 . The average urban type medical waste generation rate was 44.2±32.5g examinee -1 d -1 . Using basic regression modeling, it was shown that the number of examinees and examinations can be predictors of the IFMW generation, but not of the urban type MW generation. The number of examinations was a better predictor of the MW amounts than the number of examinees. Statistical comparison of the means of the 7PMML was done with standard ANOVA techniques after checking the normality of the data and after doing the appropriate transformations. Based on the results of this work, it is approximated that 580 tonnes of infectious MW are generated annually by the PMML in Greece. Copyright © 2017 Elsevier Ltd. All rights reserved.

  11. A Two-Bladed Teetering Hub configuration for the DTU 10 MW RWT: loads considerations

    DEFF Research Database (Denmark)

    Bergami, Leonardo; Aagaard Madsen, Helge; Rasmussen, Flemming

    2014-01-01

    study on an alternative downwind two-bladed rotor configuration. The study is based on a model representative of next generation multi-MW wind turbines: the DTU 10-MW Reference Wind Turbine (RWT). As a first design iteration, the aerodynamic characteristics of the original rotor are maintained......As the size of wind turbine rotors continuously grows, the need for innovative solutions that would yield to lighter rotor configurations becomes more urgent. Traditional wind turbine designs have favored the classic three-bladed upwind rotor configuration. This work presents instead a concept...... in load variations, and hence in fatigue damage, affects the turbine blades, shaft and tower, and originates from the aerodynamic unbalance on the rotor, as well as from aeroelastic interaction with the tower frequency. To mitigate the load amplification caused by the interaction between the tower...

  12. Ultra Clean 1.1MW High Efficiency Natural Gas Engine Powered System

    Energy Technology Data Exchange (ETDEWEB)

    Zurlo, James; Lueck, Steve

    2011-08-31

    Dresser, Inc. (GE Energy, Waukesha gas engines) will develop, test, demonstrate, and commercialize a 1.1 Megawatt (MW) natural gas fueled combined heat and power reciprocating engine powered package. This package will feature a total efficiency > 75% and ultra low CARB permitting emissions. Our modular design will cover the 1 – 6 MW size range, and this scalable technology can be used in both smaller and larger engine powered CHP packages. To further advance one of the key advantages of reciprocating engines, the engine, generator and CHP package will be optimized for low initial and operating costs. Dresser, Inc. will leverage the knowledge gained in the DOE - ARES program. Dresser, Inc. will work with commercial, regulatory, and government entities to help break down barriers to wider deployment of CHP. The outcome of this project will be a commercially successful 1.1 MW CHP package with high electrical and total efficiency that will significantly reduce emissions compared to the current central power plant paradigm. Principal objectives by phases for Budget Period 1 include: • Phase 1 – market study to determine optimum system performance, target first cost, lifecycle cost, and creation of a detailed product specification. • Phase 2 – Refinement of the Waukesha CHP system design concepts, identification of critical characteristics, initial evaluation of technical solutions, and risk mitigation plans. Background

  13. Supercontinuum Generation in a Photonic Crystal Fibre

    Institute of Scientific and Technical Information of China (English)

    YAN Pei-Guang; RUAN Shuang-Chen; LIN Hao-Jia; DU Chen-Lin; YU Yong-Qin; LU Ke-Cheng; YAO Jian-Quan

    2004-01-01

    @@ Nearly 1000-nm broad continuum from 390nm to 1370nm is generated in a 2-m long photonic crystal fibre. The maximum total power of supercontinuum is measured to be 60mW with the pumping power of 800mW output from a 200-fs Ti:sapphire laser. The evolution of the pumping light into supercontinuum is experimentally studied in detail. It is found that the mechanism for supercontinuum generation has direct relations with Raman effect and soliton effect, and the four-wave mixing plays an important role in the last phase of the supercontinuum generation.

  14. Hurricane Satellite (HURSAT) Microwave (MW)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Hurricane Satellite (HURSAT) from Microwave (MW) observations of tropical cyclones worldwide data consist of raw satellite observations. The data derive from the...

  15. Generation of 320 mW at 10.20 μm based on CdSe long-wave infrared crystal

    Science.gov (United States)

    Wang, Jian; Yuan, Ligang; Zhang, Yingwu; Chen, Guo; Cheng, Hongjuan; Gao, Yanzhao

    2018-06-01

    CdSe single crystal, with the sizes of ∼54 mm in diameter and ∼25 mm in length, was grown by a high pressure vertical gradient freeze (HPVGF) technique using (0 0 1)-oriented seed. The CdSe crystal was characterized with transmission spectrophotometer. The transmission spectra showed that the infrared transmission was above 68% and the mean absorption coefficient was 0.041 cm-1 in the range of 2.5-20 μm. Using fabricated CdSe crystal with the dimensions of 6 mm × 10 mm × 44 mm, we demonstrated an optical parametric oscillator (OPO) pumped by a 2.05 μm Ho:YLF laser at a pulse repetition frequency of 5 kHz. Up to 320 mW output was obtained at the idler wavelength of 10.20 μm with a pump power of 18.06 W. 320 mW at 10.20 μm, to our knowledge, was the highest power obtained with a 2.05 μm laser-pumped CdSe OPO.

  16. The DAN-AERO MW experiments. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Aagaard Madsen, H.; Bak, C.; Schmidt Paulsen, U.; Gaunaa, M. (Risoe DTU, Roskilde (Denmark)); Fuglsang, P. (LM Glasfiber, Kolding (Denmark)); Romblad, J.; Olesen, N.A. (Vestas Wind Systems, Ringkoebing (Denmark)); Enevoldsen, P.; Laursen, J. (Siemens Wind Power, Ballerup (Denmark)); Jensen, Leo (DONG Energy, Fredericia (Denmark))

    2010-09-15

    This report describes the DAN-AERO MW experiments carried out within a collaborative, three years research project between Risoe DTU and the industrial partners LM Glasfiber, Siemens Wind Power, Vestas Wind Systems A/S and the utility company DONG Energy. The main objective of the project was to establish an experimental data base which can provide new insight into a number of fundamental aerodynamic and aero-acoustic issues, important for the design and operation of MW size turbines. The most important issue is the difference between airfoil characteristics measured under 2D, steady conditions in a wind tunnel and the unsteady 3D flow conditions on a rotor. The different transition characteristics might explain some of the differences between the 2D and 3D airfoil data and the experiments have been set up to provide data on this subject. The overall experimental approach has been to carry out a number of coordinated, innovative measurements on full scale MW size rotors as well as on airfoils for MW size turbines in wind tunnels. Shear and turbulence inflow characteristics were measured on a Siemens 3.6 MW turbine with a five hole pitot tube. Pressure and turbulent inflow characteristics were measured on a 2MW NM80 turbine with an 80 m rotor. One of the LM38.8 m blades on the rotor was replaced with a new LM38.8 m blade where instruments for surface pressure measurements at four radial sections were build into the blade during the blade production process. Additionally, the outmost section on the blade was further instrumented with around 50 microphones for high frequency surface pressure measurements. The surface pressure measurements have been correlated with inflow measurements from four five hole pitot tubes and two sensors for measuring the high frequency (50 Hz to10 kHz) contents of the inflow turbulence. In parallel, 2D wind tunnel measurements on common airfoils for wind turbine applications have been conducted in three different wind tunnels at Delft

  17. 30 400 MW worldwide in early 2003

    International Nuclear Information System (INIS)

    Anon.

    2003-01-01

    Accounting for more than 74% of wind power output in the world, Europe is now more than ever the spearhead of the wind energy industry. First estimates for 2002 show a 6 000 MW progression that now places total world output around 30 400 MW, that is enough to electrify 17 million households. Nevertheless, although it's still growing at a remarkable speed, the rate of development for wind energy has slowed down for the first time in years. (authors)

  18. Energy and Exergy Analysis of 210 MW Jamshoro Thermal Power Plant

    Directory of Open Access Journals (Sweden)

    Muhib Ali Rajper

    2016-04-01

    Full Text Available In this paper, thermodynamic analysis of 210 MW dual-fire, subcritical, reheat steam power plant, situated near Jamshoro, Pakistan has been performed. Firstly, the plant is modeled by EES (Engineering Equation Solver software. Moreover; a parametric study is performed to assess the impacts of various operating parameters on the performance. The net power output, energy efficiency and exergy efficiency are considered as performance parameters of the plant whereas, condenser pressure, main steam pressure and main steam temperature are nominated as operating parameters. According to the results, the net power output, energy efficiency and exergy efficiency are determined as 186.5 MW, 31.37% and 30.41% respectively, under design operating conditions. The condenser contributed a major share in the total energy loss i.e. 280 MW (68.7% followed by boiler with 89 MW (21.8%. The major exergy destructing area is found in the boiler with 350 MW (82.11% of the total exergy destruction followed by turbine with 43.1 MW (10.12% and condenser 12 MW (5.74 %. According to the parametric study, variation in operating parameters had great influence on the plant performance

  19. Development of a 5 MW reference gearbox for offshore wind turbines: 5 MW reference gearbox

    Energy Technology Data Exchange (ETDEWEB)

    Nejad, Amir Rasekhi [Norwegian Research Center for Offshore Wind Technology, Norwegian University of Science and Technology, Trondheim Norway; Center for Ships and Ocean Structures, Norwegian University of Science and Technology, Trondheim Norway; Guo, Yi [National Wind Technology Center, National Renewable Energy Laboratory, Golden Colorado USA; Gao, Zhen [Center for Ships and Ocean Structures, Norwegian University of Science and Technology, Trondheim Norway; Moan, Torgeir [Norwegian Research Center for Offshore Wind Technology, Norwegian University of Science and Technology, Trondheim Norway; Center for Ships and Ocean Structures, Norwegian University of Science and Technology, Trondheim Norway

    2015-07-27

    This paper presents detailed descriptions, modeling parameters and technical data of a 5MW high-speed gearbox developed for the National Renewable Energy Laboratory offshore 5MW baseline wind turbine. The main aim of this paper is to support the concept studies and research for large offshore wind turbines by providing a baseline gearbox model with detailed modeling parameters. This baseline gearbox follows the most conventional design types of those used in wind turbines. It is based on the four-point supports: two main bearings and two torque arms. The gearbox consists of three stages: two planetary and one parallel stage gears. The gear ratios among the stages are calculated in a way to obtain the minimum gearbox weight. The gearbox components are designed and selected based on the offshore wind turbine design codes and validated by comparison to the data available from large offshore wind turbine prototypes. All parameters required to establish the dynamic model of the gearbox are then provided. Moreover, a maintenance map indicating components with high to low probability of failure is shown. The 5 MW reference gearbox can be used as a baseline for research on wind turbine gearboxes and comparison studies. It can also be employed in global analysis tools to represent a more realistic model of a gearbox in a coupled analysis.

  20. 2 MW 110 GHz ECH heating system for DIII-D

    International Nuclear Information System (INIS)

    Moeller, C.; Prater, R.; Callis, R.; Remsen, D.; Doane, J.; Cary, W.; Phelps, R.; Tupper, M.

    1990-09-01

    A 2 MW 110 GHz ECH system using Varian 0.5 MW gyrotrons is under construction for use on the DIII-D tokamak by late 1991. Most of the components are being design and fabricated at General Atomics, including the gyrotron tanks, superconducting magnets, and transmission line. These components are intended for operation with 10 second pulses and, in the future, with 1 MW gyrotrons. 6 refs., 5 figs

  1. PS main supply: motor-generator set.

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    In picture 04 the motor is on the right in the background and the main view is of the generator. The peak power in each PS cycle drawn from the generator, up to 96 MW, is taken from the rotational kinetic energy of the rotor (a heavy-weight of 80 tons), which makes the rotational speed drop by only a few percent. The motor replenishes the average power of 2 to 4 MW. Photo 05: The motor-generator set is serviced every year and, in particular, bearings and slip-rings are carefully checked. To the left is the motor with its slip-rings visible. It has been detached from the axle and moved to the side, so that the rotor can be removed from the huge generator, looming at the right.

  2. Human health tradeoffs in wellhead drinking water treatment: Comparing exposure reduction to embedded life cycle risks.

    Science.gov (United States)

    Gifford, Mac; Chester, Mikhail; Hristovski, Kiril; Westerhoff, Paul

    2018-01-01

    Treatment of drinking water decreases human health risks by reducing pollutants, but the required materials, chemicals, and energy emit pollutants and increase health risks. We explored human carcinogenic and non-carcinogenic disease tradeoffs of water treatment by comparing pollutant dose-response curves against life cycle burden using USEtox methodology. An illustrative wellhead sorbent groundwater treatment system removing hexavalent chromium or pentavalent arsenic serving 3200 people was studied. Reducing pollutant concentrations in drinking water from 20 μg L -1 to 10 μg L -1 avoided 37 potential cancer cases and 64 potential non-cancer disease cases. Human carcinogenicity embedded in treatment was 0.2-5.3 cases, and non-carcinogenic toxicity was 0.2-14.3 cases, depending on technology and degree of treatment. Embedded toxicity impacts from treating Cr(VI) using strong-base anion exchange were 90% of the toxicity impacts for treatment options requiring pH control. In scenarios where benefits exceeded burdens, tradeoffs still existed. Benefits are experienced by a local population but burdens are born externally where the materials and energy are produced, thus exporting the health risks. Even when burdens clearly exceeded benefits, cost considerations may still drive selecting a detrimental treatment level or technology. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Superconducting wind turbine generators

    DEFF Research Database (Denmark)

    Abrahamsen, Asger Bech; Mijatovic, Nenad; Seiler, Eugen

    2010-01-01

    , the main challenge of the superconducting direct drive technology is to prove that the reliability is superior to the alternative drive trains based on gearboxes or permanent magnets. A strategy of successive testing of superconducting direct drive trains in real wind turbines of 10 kW, 100 kW, 1 MW and 10......We have examined the potential of 10 MW superconducting direct drive generators to enter the European offshore wind power market and estimated that the production of about 1200 superconducting turbines until 2030 would correspond to 10% of the EU offshore market. The expected properties of future...... offshore turbines of 8 and 10 MW have been determined from an up-scaling of an existing 5 MW turbine and the necessary properties of the superconducting drive train are discussed. We have found that the absence of the gear box is the main benefit and the reduced weight and size is secondary. However...

  4. Neutron generator based on adiabatic trap

    International Nuclear Information System (INIS)

    Golovin, I.N.; Zhil'tsov, V.A.; Panov, D.A.; Skovoroda, A.A.; Shatalov, G.E.; Shcherbakov, A.G.

    1988-01-01

    A possibility of 14 MeV neutron generator (NG) production on the basis of axial-symmetric adiabatic trap with MHD cusped armature for the testing of materials and elements of the DT reactor first wall and blanket structure is discussed. General requirements to NG are formulated. It is shown that the NG variant discussed meets the requirements formulated. Approximate calculation of the NG parameters has shown that total energy consumption by the generator does not exceed 220 MW at neutron flux specific capacity of 2.5 MW/m 2 and radiation test area of 5-6 m 2

  5. Modelling the economic impacts of 500 MW of wave power in Ireland

    International Nuclear Information System (INIS)

    Deane, J.P.; Dalton, G.; Ó Gallachóir, B.P.

    2012-01-01

    This paper investigates the impacts of including 500 MW of wave power into Ireland’s electricity generation portfolio in the year 2020. One year of detailed market simulations are undertaken to determine the impact on wholesale electricity prices, system operation costs and CO 2 emissions with and without this installed wave power under a number carbon prices assumptions. In both scenarios (with and without wave energy), Ireland’s installed renewable capacity is fixed such that 40% of Ireland’s electricity in 2020 is from renewable source. The likely revenue a wave energy device would earn in the market is also investigated and compared with what is required to achieve 500 MW installed capacity. It is shown that in general the inclusion of wave energy has a negligible effect on wholesale electricity prices, reduces total system cost in Ireland and can increase CO 2 emissions on the island of Ireland under certain carbon price assumptions. It is also shown the current REFIT for wave energy is adequate. - Highlights: ► We modelled the Irish Electricity Market in 2020 with and without 500 MW of wave energy. ► The inclusion of wave energy did not have a significant impact on system marginal prices. ► The inclusion of wave energy reduced total costs in the system relative to a wind only scenario. ► REFIT tariff remains an essential financial support for the nascent wave energy industry.

  6. Performance test of a 1 MW class HTS synchronous motor for industrial application

    International Nuclear Information System (INIS)

    Kwon, Y.K.; Kim, H.M.; Baik, S.K.; Lee, E.Y.; Lee, J.D.; Kim, Y.C.; Lee, S.H.; Hong, J.P.; Jo, Y.S.; Ryu, K.S.

    2008-01-01

    This paper deals with development activities of high temperature superconducting (HTS) synchronous motor at DOOSAN heavy industry and Korea Electrotechnology Research Institute (KERI) in Korea, and is sponsored by DAPAS program which is supported by Korean government. The final aim of the project is realization of HTS motor in the field of industry such as large driving pumps, fans and compressors for utility and industrial environments. At present time, 1 MW HTS motor is developed for the purpose to fully represent the design and manufacturing issues for the larger capacity machine. The number of pole and rotating speed of machine are 2 pole and 3600 rpm. The HTS field coil of the developed motor is cooled by way of neon thermosyphon mechanism and the stator coil is cooled by water through hollow copper conductor. This paper describes status of 1 MW HTS motor development, such as design, fabrication and performance test results, which was conducted at steady state in generator mode and motor mode

  7. The Los Alamos 600 MJ, 1500 MW inertial energy storage and pulsed power unit

    International Nuclear Information System (INIS)

    Boenig, H.J.

    1991-01-01

    A 1430 MVA synchronous generator from a cancelled nuclear power plant has been installed and commissioned at Los Alamos National Laboratory (LANL) to be used as the pulsed power generator for physics experiments. The generator is mounted on a spring foundation to prevent dynamic forces from being transmitted to the substructure and into the ground. A 6 MW load-commutated inverter drive accelerates the machine from standstill to the maximum operating speed of 1800 rpm and from 1260 rpm to 1800 rpm between load pulses. The generator cooling method has been changed from hydrogen to air cooling to facilitate operation. A current limiting fuse, with a fuse clearing current of 90 kA, will protect the generator output against short circuit currents. An overview of the installation is presented. The paper also addresses the overload capability of the generator for pulsed loads. 7 figs., 1 tab

  8. The first test results of the new MAN 6 MW gas turbine; Erste Erprobungsergebnisse zur neuen 6-MW-MAN-Gasturbine

    Energy Technology Data Exchange (ETDEWEB)

    Beukenberg, Markus; Wiedermann, Alexander; Orth, Ulrich; Aschenbruck, Emil; Reiss, Frank [MAN Diesel und Turbo SE, Oberhausen (Germany)

    2011-07-01

    The development of a completely new series of gas turbines requires significant capital, resources and know-how. MAN Diesel and Turbo strategically decided to create a gas turbine in the 6 MW class. The construction of the gas turbine has been on the basis of opportunities in current and future markets and the positioning of competition, this has determined the characteristics and technical parameters which have been optimised in the 6 MW design. (orig.)

  9. The 140 GHZ, 1 MW Gyrotron - Status and Recent Results

    Science.gov (United States)

    Gantenbein, G.; Dammertz, G.; Illy, S.; Kern, S.; Leonhardt, W.; Piosczyk, B.; Schmid, M.; Thumm, M.; Braune, H.; Erckmann, V.; Laqua, H. P.; Michel, G.; Kasparek, W.; Lechte, C.; Legrand, F.; Lievin, C.; Prinz, O.

    2009-04-01

    A 10 MW ECRH system is currently under construction for the stellarator W7-X which will be built up and operated by IPP in Greifswald, Germany. The present status of the complete system is reported in [1]. The RF power will be provided by 10 gyrotrons. A European collaboration has been established to develop and build the 10 gyrotrons each with an output power of 1 MW for continuous wave (CW) operation [2]. Nine gyrotrons are being manufactured by Thales Electron Devices (TED), Vélizy, France, one gyrotron was produced by CPI, Palo Alto, CA and passed the acceptance tests at IPP. The acceptance tests of the TED gyrotrons are performed at the test stand at FZK and on site at IPP. The first series tube yielded a total output power of 0.98 MW, with an efficiency of 31 % (without a single stage depressed collector) in short pulse operation and of 0.92 MW in pulses of 1800 s (efficiency of almost 45 % at a depression voltage of 29 kV) [3], The Gaussian mode output power was 0.91 MW. The RF power, measured in a calorimetric load at the end of a 25 m long quasi-optical transmission line with seven mirrors, was 0.87 MW. In this contribution typical results of the next series gyrotrons will be reported.

  10. The development situation of biomass gasification power generation in China

    International Nuclear Information System (INIS)

    Zhou, Zhaoqiu; Yin, Xiuli; Xu, Jie; Ma, Longlong

    2012-01-01

    This work presents the development situation of biomass gasification power generation technology in China and analyzes the difficulty and challenge in the development process. For China, a large agricultural country with abundant biomass resources, the utilization of biomass gasification power generation technology is of special importance, because it can contribute to the electricity structure diversification under the present coal-dominant electricity structure, ameliorate the environmental impact, provide energy to electricity-scarce regions and solve the problems facing agriculture. Up to now, China has developed biomass gasification power generation plants of different types and scales, including simple gas engine-based power generation systems with capacity from several kW to 3 MW and integrated gasification combined cycle systems with capacity of more than 5 MW. In recent years, due to the rising cost of biomass material, transportation, manpower, etc., the final cost of biomass power generation has increased greatly, resulting in a serious challenge in the Chinese electricity market even under present preferential policy for biomass power price. However, biomass gasification power generation technology is generally in accord with the characteristics of biomass resources in China, has relatively good adaptability and viability, and so has good prospect in China in the future. - Highlights: ► Biomass gasification power generation of 2 kW–2 MW has wide utilization in China. ► 5.5 MW biomass IGCC demonstration plant has maximum power efficiency of up to 30%. ► Biomass power generation is facing a serious challenge due to biomass cost increase.

  11. The 2009 MW MW 6.1 L'Aquila fault system imaged by 64k earthquake locations

    International Nuclear Information System (INIS)

    Valoroso, Luisa

    2016-01-01

    On April 6 2009, a MW 6.1 normal-faulting earthquake struck the axial area of the Abruzzo region in central Italy. We investigate the complex architecture and mechanics of the activated fault system by using 64k high-resolution foreshock and aftershock locations. The fault system is composed by two major SW dipping segments forming an en-echelon NW trending system about 50 km long: the high-angle L’Aquila fault and the listric Campotosto fault, located in the first 10 km depth. From the beginning of 2009, fore shocks activated the deepest portion of the main shock fault. A week before the MW 6.1 event, the largest (MW 4.0) foreshock triggered seismicity migration along a minor off-fault segment. Seismicity jumped back to the main plane a few hours before the main shock. High-precision locations allowed to peer into the fault zone showing complex geological structures from the metre to the kilometre scale, analogous to those observed by field studies and seismic profiles. Also, we were able to investigate important aspects of earthquakes nucleation and propagation through the upper crust in carbonate-bearing rocks such as: the role of fluids in normal-faulting earthquakes; how crustal faults terminate at depths; the key role of fault zone structure in the earthquake rupture evolution processes.

  12. Evaluation of the Hydropower Generation Potential of a Dam Using Optimization Techniques: Application to Doma Dam, Nassarawa, in North Central Nigeria

    Directory of Open Access Journals (Sweden)

    Salami Adebayo Wahab

    2017-03-01

    Full Text Available Optimization models have been developed to maximize annual energy generation from the Doma dam, subject to the constraint of releases for irrigation, ecological purposes, the water supply, the maximum yield from the reservoir and reservoir storage. The model was solved with LINGO software for various mean annual inflow exceedence probabilities. Two scenarios of hydropower retrofitting were considered. Scenario 1, with the reservoir inflows at 50%, 75%, and 90% probabilities of exceedence, gives the total annual hydropower as 0.531 MW, 0.450 MW and 0.291 MW, respectively. The corresponding values for scenario 2 were 0.615 MW, 0.507 MW, and 0.346 MW respectively. The study also considered increasing the reservoir’s live storage to 32.63Mm3 by taking part of the flood storage so that the maximum draft increases to 7 Mm3. With this upper limit of storage and draft with reservoir inflows of 50%, 75% and 90% probabilities of exceedence, the hydropower generated increased to 0.609 MW, 0.540 MW, and 0.347 MW respectively for the scenario 1 arrangement, while those of scenario 2 increased to 0.699 MW, 0.579MW and 0.406 MW respectively. The results indicate that the Doma Dam is suitable for the production of hydroelectric power and that its generation potential is between 0.61 MW and 0.70 MW.

  13. Turbines, generators and associated plant incorporating modern power system practice

    CERN Document Server

    Littler, DJ

    1992-01-01

    The introduction of new 500 MW and 660 MW turbine generator plant in nuclear, coal- and oil-fired power stations has been partly responsible for the increase in generating capacity of the CEGB over the last 30 years. This volume provides a detailed account of experience gained in the development, design, manufacture, operation and testing of large turbine-generators in the last 20 years. With the advance in analytical and computational techniques, the application of this experience to future design and operation of large turbine-generator plant will be of great value to engineers in the indust

  14. S-band 45 MW peak power test facility at RRCAT

    International Nuclear Information System (INIS)

    Wanmode, A. Yashwant; Reddy, Sivananda; Mulchandani, J.; Mohania, Praveen; Shrivastava, B. Purushottam

    2015-01-01

    RRCAT is engaged in the design and development of high energy electron LINAC as future injectors for the Booster Synchrotron for Indus-1 and Indus-2 SRS. The high energy LINAC will need microwave power over 30 MW depending on the number of structures to be energized. In order to have advance preparations for this development a 45 MW S-Band test facility has been designed and developed at RRCAT. The test stand is built around a 45 MW peak power S-band pulsed klystron, A conventional pulse forming network based modulator for klystron has been designed and developed. The WR-284 waveguide transmission system consisting of dual directional couplers, SF 6 gas pressurization unit, high power waveguide load and arc sensor has been developed and interfaced with the klystron. The klystron has been successfully tested up to 30 MW peak power at 2856 MHz on SF 6 pressurized waveguide line. A solid state S Band driver amplifier up to 1 kW output power was designed developed for driving the klystron. This paper describes the results of 30 MW peak power test of this facility. (author)

  15. Reaction of the immune system to low-level RF/MW exposures

    International Nuclear Information System (INIS)

    Szmigielski, Stanislaw

    2013-01-01

    Radiofrequency (RF) and microwave (MW) radiation have been used in the modern world for many years. The rapidly increasing use of cellular phones in recent years has seen increased interest in relation to the possible health effects of exposure to RF/MW radiation. In 2011 a group of international experts organized by the IARC (International Agency for Research on Cancer in Lyon) concluded that RF/MW radiations should be listed as a possible carcinogen (group 2B) for humans. The incomplete knowledge of RF/MW-related cancer risks has initiated searches for biological indicators sensitive enough to measure the “weak biological influence” of RF/MWs. One of the main candidates is the immune system, which is able to react in a measurable way to discrete environmental stimuli. In this review, the impacts of weak RF/MW fields, including cell phone radiation, on various immune functions, both in vitro and in vivo, are discussed. The bulk of available evidence clearly indicates that various shifts in the number and/or activity of immunocompetent cells are possible, however the results are inconsistent. For example, a number of lymphocyte functions have been found to be enhanced and weakened within single experiments based on exposure to similar intensities of MW radiation. Certain premises exist which indicate that, in general, short-term exposure to weak MW radiation may temporarily stimulate certain humoral or cellular immune functions, while prolonged irradiation inhibits the same functions

  16. Reaction of the immune system to low-level RF/MW exposures

    Energy Technology Data Exchange (ETDEWEB)

    Szmigielski, Stanislaw, E-mail: szmigielski@wihe.waw.pl

    2013-06-01

    Radiofrequency (RF) and microwave (MW) radiation have been used in the modern world for many years. The rapidly increasing use of cellular phones in recent years has seen increased interest in relation to the possible health effects of exposure to RF/MW radiation. In 2011 a group of international experts organized by the IARC (International Agency for Research on Cancer in Lyon) concluded that RF/MW radiations should be listed as a possible carcinogen (group 2B) for humans. The incomplete knowledge of RF/MW-related cancer risks has initiated searches for biological indicators sensitive enough to measure the “weak biological influence” of RF/MWs. One of the main candidates is the immune system, which is able to react in a measurable way to discrete environmental stimuli. In this review, the impacts of weak RF/MW fields, including cell phone radiation, on various immune functions, both in vitro and in vivo, are discussed. The bulk of available evidence clearly indicates that various shifts in the number and/or activity of immunocompetent cells are possible, however the results are inconsistent. For example, a number of lymphocyte functions have been found to be enhanced and weakened within single experiments based on exposure to similar intensities of MW radiation. Certain premises exist which indicate that, in general, short-term exposure to weak MW radiation may temporarily stimulate certain humoral or cellular immune functions, while prolonged irradiation inhibits the same functions.

  17. Fast 3D seismic wave simulations of 24 August 2016 Mw 6.0 central Italy earthquake for visual communication

    Directory of Open Access Journals (Sweden)

    Emanuele Casarotti

    2016-12-01

    Full Text Available We present here the first application of the fast reacting framework for 3D simulations of seismic wave propagation generated by earthquakes in the Italian region with magnitude Mw 5. The driven motivation is to offer a visualization of the natural phenomenon to the general public but also to provide preliminary modeling to expert and civil protection operators. We report here a description of this framework during the emergency of 24 August 2016 Mw 6.0 central Italy Earthquake, a discussion on the accuracy of the simulation for this seismic event and a preliminary critical analysis of the visualization structure and of the reaction of the public.

  18. HPP Boshkov Most - upgrading the designed installed capacity from 45 MW to 70 MW

    International Nuclear Information System (INIS)

    Pavleski, Vlatko; Jakimova-Filipovska, Nevenka; Ivanova-Davidovikj, Jasna

    2004-01-01

    HPP Boskov Most location will be near the town of Debar, accessible from the Mavrovo-Debar road. This Project involves the tributaries that combine to make tip the Mala Reka, the biggest tributary to Radika river. The watershed area is characterized as having high mountains and rich watercourses, without major settlements. The hydro system consists of: The Tresonce Reservoir with 44 m high dam, with an intake to a head race tunnel, also additional intakes linked by a system of siphons, covered channels collect the waters from high mountains and deliver their flow to the head- race tunnel. The head race tunnel ends with surge shaft and pen stock to the powerhouse. In this paper will be given differences between the Main Design prepared by HEP - Skopje in 1983, where the installed capacity is 45 MW and Feasibility Study prepared by Paul C. Rizzo Ass., where installed capacity is suggested to be 70 MW through enlarged nominal discharge - from 14 m 3 /s to 22 m 3 /s. (Author)

  19. Design and test of a 2.25-MW transformer rectifier assembly

    Science.gov (United States)

    Cormier, R.; Daeges, J.

    1989-01-01

    A new 2.25-MW transformer rectifier assembly was fabricated for DSS-13 at Goldstone, California. The transformer rectifier will provide constant output power of 2.25 MW at any voltage from 31 kV to 125 kV. This will give a new capability of 1 MW of RF power at X-band, provided appropriate microwave tubes are in the power amplifier. A description of the design and test results is presented.

  20. HPP Boshkov Most - upgrading of the design installed capacity from 45 MW to 70 MW

    International Nuclear Information System (INIS)

    Pavleski, Vlatko; Jakimova Filipovska, Nevenka; Ivanova-Davidovicj, Jasna

    2007-01-01

    HPP Boshkov Most location will be near the town of Debar, accessible from Mavrovo-Debar road. This procject involves the tributaries that combine to make up the Mala Reka, the biggest tributary to Radika river. The watershed area is characterized as having high mountains and rich watercourses, without major settlements. The hydro system consists of: The Tresonche reservoir with 44 m high dam, with an intake to head race tunnel, also additional intakes linked by a system siphons, covered channels collect the waters from high mountains and deliver their flow to the head race tunnel. The head race tunnel ends with surge shaft and penstocks to the powerhouse. In this paper will be given differences between the Main Design prepared by HEP - Skopje in 1983, where the installed capacity is 45 MW and feasibility Study prepared by Pall C. Rizzo Ass., where installed capacity is suggested to be 70 MW, thru enlarged nominal discharge - from 14 m 3 /s to 22 m 3 /s. (Author)

  1. MW-Class Electric Propulsion System Designs

    Science.gov (United States)

    LaPointe, Michael R.; Oleson, Steven; Pencil, Eric; Mercer, Carolyn; Distefano, Salvador

    2011-01-01

    Electric propulsion systems are well developed and have been in commercial use for several years. Ion and Hall thrusters have propelled robotic spacecraft to encounters with asteroids, the Moon, and minor planetary bodies within the solar system, while higher power systems are being considered to support even more demanding future space science and exploration missions. Such missions may include orbit raising and station-keeping for large platforms, robotic and human missions to near earth asteroids, cargo transport for sustained lunar or Mars exploration, and at very high-power, fast piloted missions to Mars and the outer planets. The Advanced In-Space Propulsion Project, High Efficiency Space Power Systems Project, and High Power Electric Propulsion Demonstration Project were established within the NASA Exploration Technology Development and Demonstration Program to develop and advance the fundamental technologies required for these long-range, future exploration missions. Under the auspices of the High Efficiency Space Power Systems Project, and supported by the Advanced In-Space Propulsion and High Power Electric Propulsion Projects, the COMPASS design team at the NASA Glenn Research Center performed multiple parametric design analyses to determine solar and nuclear electric power technology requirements for representative 300-kW class and pulsed and steady-state MW-class electric propulsion systems. This paper describes the results of the MW-class electric power and propulsion design analysis. Starting with the representative MW-class vehicle configurations, and using design reference missions bounded by launch dates, several power system technology improvements were introduced into the parametric COMPASS simulations to determine the potential system level benefits such technologies might provide. Those technologies providing quantitative system level benefits were then assessed for technical feasibility, cost, and time to develop. Key assumptions and primary

  2. Special technology with high safety-related standards for the repair of the wellhead damage of a gas filled cavern at storage site Stassfurt; Spezialtechnologie mit hohen Sicherheitsvorkehrungen zur Beseitigung des Bohrlochkopfschadens einer Gaskaverne des Kavernenspeichers Stassfurt

    Energy Technology Data Exchange (ETDEWEB)

    Walden, S.; Klafki, M. [ESK-Erdgasspeicher Kalle GmbH, Freiberg (Germany)

    2008-11-15

    For the completion of the cavern Stassfurt S 106 which was leached by the so called ''solution mining under gas'' technology, the leaching strings 6 5/8''-4 1/2'' should be pulled out by using a snubbing unit. Due to an unexpected damage at the wellhead, the job could not be realized as projected. Therefore the snubbing work was stopped. For solving the technical damage different repair concepts were investigated, for example partial flooding of the cavern with brine or water, sealing of wellhead components by freezing or cutting of the lower leaching string section and setting plugs afterwards. All concepts had been evaluated concerning feasibility and risks. The most favourable technology was selected on the basis of a comparison of pros and cons and was planned for realization according to a detailed working programme. The specialized contractors as well as the fire brigade have guaranteed the required safety measures. The essential planning and working steps will be described as well as the acquired experiences will be explained in the following section. Finally, it can be stated that all jobs were realized according to the projected programme and all involved persons perfectly worked with the special technologies. (orig.)

  3. A 2MW 6-phase BLDC Generator Developed from a PM Synchronous Generator for Wind Energy Application

    DEFF Research Database (Denmark)

    Chen, Zhuihui; Chen, Zhe; Liu, Xiao

    2014-01-01

    rectifier is adopted. The cases the with different loads are studied. The finite element simulation shows the developed BLDC generator is better than the PMSM generator in terms of DC voltage ripple and torque ripple. Furthermore, the volume of the BLDC generator is smaller, despite of more permanent magnet......In the direct drive wind turbine application, a PMSM generator often works together with a diode rectifier, which connects to a boost converter. In this paper, a six-phase BLDC generator is developed from the prototype design of three-phase permanent magnet synchronous generator. The diode...... is required. The efficiencies and the costs are also compared. As the result shows, BLDC generators connected with the diode rectifiers are good candidates for direct drive wind turbines....

  4. Tri-generation in Lisbon: 60 MW coldness, 44 MW heat, 5 MW electric power, 44 km of network; Trigeneration a Lisbonne: 60 MW froid, 44 MW chaud, 5 MW electricite, 44 km de reseau

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2001-11-01

    A tri-generation facility in Lisbon (Portugal) uses the chilled water produced by absorption units (water + lithium bromide) in association with compression groups (ammonia). The combination of both technologies allows to optimize the production of chilled water which is also stored for a better adaptability of use. This facility will supply 450000 m{sup 2} of offices, 150000 m{sup 2} of commercial buildings, 50000 m{sup 2} of public facilities, a marina and about 10000 apartments, which represents a total of 2.5 million of m{sup 2}. A huge network of insulated steel pipes ensures the district heating/cooling of the new industrial area of Lisbon. (J.S.)

  5. Brief introduction to 60 MW CARR

    Energy Technology Data Exchange (ETDEWEB)

    Tonghua, Yang; Chuntang, Ye [China Inst. of Atomic Energy, Beijing BJ (China)

    1998-10-01

    CARR, a 60 MW reactor will be constructed at China Institute of Atomic Energy (CIAE). The reactor type, its safety features, core lay-out, fuel assemblies, main parameters designed, main applications of are briefly described. (author)

  6. A 2 MW, CW, 170 GHz gyrotron for ITER

    International Nuclear Information System (INIS)

    Piosczyk, B.; Arnold, A.; Alberti, S.

    2003-01-01

    A 140 GHz gyrotron for CW operation is under development for the stellarator W7-X. With a prototype tube a microwave output power of about 0.9 MW has been obtained in pulses up to 180 s, limited by the capability of the high voltage power supply. The development work on coaxial cavity gyrotrons has demonstrated the feasibility of manufacturing of a 2 MW, CW 170 GHz tube that could be used for ITER. The problems specific to the coaxial arrangement have been investigated and all relevant information needed for an industrial realization of a coaxial gyrotron have been obtained in short pulse experiments (up to 17 ms). The suitability of critical components for a 2 MW, CW coaxial gyrotron has been studied and a first integrated design has been done. (author)

  7. Comparative ranking of 0. 1-10 MW/sub e/ solar thermal electric power systems. Volume II. Supporting data. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, J.P.; Brown, K.C.; Finegold, J.G.; Gresham, J.B.; Herlevich, F.A.; Kriz, T.A.

    1980-07-01

    This report is part of a two-volume set summarizing the results of a comparative ranking of generic solar thermal concepts designed specifically for electric power generation. The original objective of the study was to project the mid-1990 cost and performance of selected generic solar thermal electric power systems for utility applications and to rank these systems by criteria that reflect their future commercial acceptance. This study considered plants with rated capacities of 1-10 MW/sub e/, operating over a range of capacity factors from the no-storage case to 0.7 and above. Later, the study was extended to include systems with capacities from 0.1 to 1 MW/sub e/, a range that is attractive to industrial and other nonutility applications. Volume I summarizes the results for the full range of capacities from 0.1 to 1.0 MW/sub e/. Volume II presents data on the performance and cost and ranking methodology.

  8. Ijsselmij exploits a large wind park of 7. 5 MW in the Noordoostpolder, Netherlands

    Energy Technology Data Exchange (ETDEWEB)

    Nauta, Y

    1988-07-01

    The energy industry Ijsselmij constructed in 1987, along the Westermeerdijk north of Urk, Netherlands, a wind park of 7.5 MW. The wind park, built on the landside of the dike, consists of 25 wind turbines with a rotor diameter of 25 m and a capacity of 300 kW each. The total investment was about 21 million Dutch guilders. The park generates more than 10 million kWh annually supplied to the public electricity grid. The site selection, the foundations, the wind turbines, the electric connection, control unit to generate data, the economic feasibility and some aspects concerning noise pollution and bird damage are discussed. Finally technical data on the wind park are given. 9 figs.

  9. Final stage of first supercritical 460MW{sub e} CFB boiler construction. First experience

    Energy Technology Data Exchange (ETDEWEB)

    Goral, Damian [Foster Wheeler Energia Polska (Poland); Ostrowski, Waldemar [PKE (Poland)

    2009-07-01

    Circulating fluidized bed (CFB) boiler technology has been growing in size and number over the past two decades and it has established its position as utility scale boiler technology. Plant sizes up to 300 MW{sub e} are in operation today and designs for larger boilers are being developed. The next natural step for CFB technology is to go for supercritical steam parameters and larger boiler sizes. A Polish utility company Poludniowy Koncern Energetyczny SA (PKE) placed an order to Foster Wheeler Energia Oy for a 460 MW{sub e} supercritical CFB boiler for their Lagisza power plant. Contract was signed at the end of year 2002 and the engineering work is now ongoing. This will be the first supercritical once-through CFB boiler in the world. A modern power plant is designed for high efficiency not only for economical reasons but also for enhanced environmental performance in terms of reduced emissions and quantity of ash generated due to lower fuel consumption. Cutting CO{sub 2} emissions is one of the main drivers. To achieve these goals, supercritical steam parameters have been applied. Now this technology is available also for CFB technology. This combines a high plant efficiency with the other well known benefits of CFB technology, such as: fuel flexibility, low emissions and high availability. The boiler design for 460 MW{sub e} Lagisza power plant utilizes low mass flux BENSON Vertical once-through technology developed and licensed by Siemens AG, Germany. CFB boiler with low and uniform furnace heat flux is extremely well suited for the Benson technology providing a stable operation of the boiler also during load changes and abnormal operation conditions. The paper describes the 460 MW{sub e} supercritical CFB boiler concept and presents the technical solutions of the boiler design with auxiliary equipment, as well as first experiences from boiler erection period and commissioning. In spite of achieving this remarkable milestone the development of the CFB

  10. Development of over 1 MW and multi-frequency gyrotrons for fusion

    International Nuclear Information System (INIS)

    Imai, T.; Kariya, T.; Minami, R.; Numakura, T.; Kato, T.; Endo, Y.; Ichimura, M.; Eguchi, T.; Mitsunaka, Y.; Shimozuma, T.; Kubo, S.; Takahashi, H.; Yoshimura, Y.; Igami, H.; Ito, S.; Mutoh, T.; Sakamoto, Keishi; Idei, H.; Zushi, H.; Nagasaki, K.; Sano, F.; Ono, M.

    2014-10-01

    The development of wide frequency range from 14 to 300 GHz of high power mega-watt gyrotron for fusion is in progress in University of Tsukuba. The strong development activity was carried out in collaboration with JAEA, NIFS, TETD and universities. Over-1 MW dual frequency gyrotron of new frequency range (14 – 35 GHz), where the reduction of diffraction loss and cathode optimization are quite important, has been developed for EC/EBW H and CD for GAMMA 10/PDX, QUEST, Heliotron J and NSTX-U. Output power of 1.25 MW at 28 GHz and estimated oscillation power of 1.2 MW at 35.45 GHz from the same tube have been achieved with the cathode angle improvement and two frequency window. This is the first demonstration of the over 1 MW dual-frequency operations in lower frequency, which contributes to the technology of wide band multi-frequency/multi-MW tube. The output power of 600 kW for 2 s at 28 GHz is also demonstrated. It is applied to the QUEST and has resulted higher EC-driven current than ever. As for higher frequency range, in the joint program of NIFS and Tsukuba for LHD ECH gyrotrons, a new frequency of 154 GHz has been successfully developed with a TE 28,8 cavity, which delivered 1.16 MW for 1 s and the total power of 4.4 MW to LHD plasma with other three 77 GHz tubes, which extended the LHD plasma to high T e region. All these gyrotron performances are new records in each frequency range. The sub-THz gyrotron development is also just begun in collaboration with JAEA for Demo-Reactor ECH system. (author)

  11. Development of MW gyrotrons for fusion devices by University of Tsukuba

    International Nuclear Information System (INIS)

    Minami, R.; Kariya, T.; Imai, T.; Numakura, T.; Endo, Y.; Nakabayashi, H.; Eguchi, T.; Shimozuma, T.; Kubo, S.; Yoshimura, Y.; Igami, H.; Takahashi, H.; Mutoh, T.; Ito, S.; Idei, H.; Zushi, H.; Yamaguchi, Y.; Sakamoto, Keishi; Mitsunaka, Y.

    2012-11-01

    Over-1 MW power gyrotrons for electron cyclotron heating (ECH) have been developed in the joint program of NIFS and University of Tsukuba. The obtained maximum outputs are 1.9 MW for 0.1 s on the 77 GHz Large Helical Device (LHD) tube and 1.0 MW for 1 ms on the 28 GHz GAMMA 10 one, which are new records in these frequency ranges. In long pulse operation, 300 kW for 40 min at 77 GHz and 540 kW for 2 s at 28 GHz were achieved. A new program of 154 GHz 1 MW development has started for high density plasma heating in LHD and the first tube has been fabricated. These lower frequency tubes like 77 GHz or 28 GHz one are also important for advanced magnetic fusion devices, which use Electron Bernstein Wave (EBW) heating / current drive. As a next activity of 28 GHz gyrotron, we have already started the development of over-1.5 MW gyrotron and a new design study of 28 GHz / 35 GHz dual frequency gyrotron, which indicates the practicability of the multi-purpose gyrotron. (author)

  12. New excitation equipment for 220 MW generators in Kozloduy NPP

    International Nuclear Information System (INIS)

    Tomerlin, D.

    2001-01-01

    Rehabilitation on the excitation equipment for Generator 5, Reactor Unit 3, in Kozloduy NPP was completed in November 2000. ABB's Static Excitation System based on UNITROL 5000 technology has been chosen by the Bulgarian National Utility and Kozloduy NPP to substitute the original Russian excitation system equipment with electro-magnetic voltage regulators. The substitution is in a rehabilitation package of four excitation system equipment for Generator 5 and 6 of Reactor Unit 3 and Generator 7 and 8 of Reactor Unit 4 after a short overview of the original excitation system this paper describes the new Static Excitation System UNITROL 5000 including configuration with block diagram, its main features and merits such as modes of operation, limiter, special control functions and diagnostic facilities. Furthermore, new facilities, which are implemented in UNITROL 5000, such as dynamic current distribution among the thyristors working in parallel as well as the start-up from the residual magnetism are mentioned. Special functions including a so-called free-running mode of operation and automatic change over sequence from new excitation system to the stand-by excitation system, which is DC exciter machine, are described. Some records of the transient responses performed during the commissioning and a photograph of a manufactured system are provided. (author)

  13. Assessment of levelized cost of electricity for a 10-MW solar chimney power plant in Yinchuan China

    International Nuclear Information System (INIS)

    Guo, Penghua; Zhai, Yaxin; Xu, Xinhai; Li, Jingyin

    2017-01-01

    Highlights: • An unsteady model is proposed for annual power generation prediction of SCPPs. • LCOE of a 10-MW SCPP in China is estimated through a cost benefit analysis. • Cost advantage and concessional loan under conditions in China are considered. • SCPP is proven to be economically feasible under favorable conditions in China. - Abstract: Solar chimney power plant (SCPP) is a promising renewable energy technology that needs policy support and market cultivation at the early stage of its development. An accurate prediction of the levelized cost of electricity (LCOE) can be used as basis for crafting effective support policies. This study presents an unsteady theoretical model that considers hourly meteorological data and soil heat storage in estimating the annual power generation of an SCPP. A cost benefit model is adopted to calculate the LCOE of a 10-MW SCPP in Yinchuan, a representative geographical location in the Northwestern region of China. By considering the cost advantage of China, the concessional loan, as well as the low operation and maintenance cost, the LCOE of the SCPP is estimated to be 0.4178 Yuan/kWh, which can compete with those of wind power and solar PV in China. This work lays a good foundation for the accurate prediction of power generation and provides a reference for the Chinese government in crafting effective support policies for SCPPs.

  14. LBNF 1.2 MW TARGET: CONCEPTUAL DESIGN & FABRICATION

    Energy Technology Data Exchange (ETDEWEB)

    Crowley, Cory F. [Fermilab; Ammigan, K. [Fermilab; Anderson, K. [Fermilab; Hartsell, B. [Fermilab; Hurh, P. [Fermilab; Hylen, J. [Fermilab; Zwaska, R. [Fermilab

    2015-06-29

    Fermilab’s Long-Baseline Neutrino Facility (LBNF) will utilize a modified design based on the NuMI low energy target that is reconfigured to accommodate beam operation at 1.2 MW. Achieving this power with a graphite target material and ancillary systems originally rated for 400 kW requires several design changes and R&D efforts related to material bonding and electrical isolation. Target cooling, structural design, and fabrication techniques must address higher stresses and heat loads that will be present during 1.2 MW operation, as the assembly will be subject to cyclic loads and thermal expansion. Mitigations must be balanced against compromises in neutrino yield. Beam monitoring and subsystem instrumentation will be updated and added to ensure confidence in target positioning and monitoring. Remote connection to the target hall support structure must provide for the eventual upgrade to a 2.4 MW target design, without producing excessive radioactive waste or unreasonable exposure to technicians during reconfiguration. Current designs and assembly layouts will be presented, in addition to current findings on processes and possibilities for prototype and final assembly fabrication.

  15. LBNF 1.2 MW Target: Conceptual Design & Fabrication

    Energy Technology Data Exchange (ETDEWEB)

    Crowley, C. [Fermilab; Ammigan, K. [Fermilab; Anderson, K. [Fermilab; Hartsell, B. [Fermilab; Hurh, P. [Fermilab; Hylen, J. [Fermilab; Zwaska, R. [Fermilab

    2015-06-01

    Fermilab’s Long-Baseline Neutrino Facility (LBNF) will utilize a modified design based on the NuMI low energy target that is reconfigured to accommodate beam operation at 1.2 MW. Achieving this power with a graphite target material and ancillary systems originally rated for 400 kW requires several design changes and R&D efforts related to material bonding and electrical isolation. Target cooling, structural design, and fabrication techniques must address higher stresses and heat loads that will be present during 1.2 MW operation, as the assembly will be subject to cyclic loads and thermal expansion. Mitigations must be balanced against compromises in neutrino yield. Beam monitoring and subsystem instrumentation will be updated and added to ensure confidence in target positioning and monitoring. Remote connection to the target hall support structure must provide for the eventual upgrade to a 2.4 MW target design, without producing excessive radioactive waste or unreasonable exposure to technicians during reconfiguration. Current designs and assembly layouts will be presented, in addition to current findings on processes and possibilities for prototype and final assembly fabrication.

  16. Important conventional island design features: generators

    International Nuclear Information System (INIS)

    Fritsch, Th.

    1985-01-01

    To-day, maximum reactor capacity is setting a provisional limit to the MW race. The latest nuclear generators in manufacturing are rated 1530 MW - 1710 MVA and are doubtless the most powerful ones in the world. The target to be aimed at in designing large turbogenerators may be defined by the following points: 1) meeting the rated load conditions without overpassing maximum admissible temperatures in any part of the machine; 2) keeping losses as small as possible; 3) keeping overall size small enough to allow rail transportation from the works to the site; 4) choosing well experienced solutions in order to set a highly reliable machine with maximum maintenance. In this report the main features of nuclear generators in the 1000-2000 MVA range are described. (Auth.)

  17. Magnetohydrodynamic generator and pump system

    International Nuclear Information System (INIS)

    Birzvalk, Yu.A.; Karasev, B.G.; Lavrentyev, I.V.; Semikov, G.T.

    1983-01-01

    The MHD generator-pump system, or MHD coupling, is designed to pump liquid-metal coolant in the primary circuit of a fast reactor. It contains a number of generator and pump channels placed one after another and forming a single electrical circuit, but hydraulically connected parallel to the second and first circuits of the reactor. All the generator and pump channels are located in a magnetic field created by the magnetic system with an excitation winding that is fed by a regulated direct current. In 500 to 2000 MW reactors, the flow rate of the coolant in each loop of the primary circuit is 3 to 6 m 3 /s and the hydraulic power is 2 to 4 MW. This paper examines the primary characteristics of an MHD generator-pump system with various dimensions and number of channels, wall thicknesses, coolant flow rates, and magnetic fields. It is shown that its efficiency may reach 60 to 70%. The operating principle of the MHD generator-pump system is explained in the referenced patent and involves the transfer of hydraulic power from generator channels to pump channels using a magnetic field and electrical circuit common to both channels. Variations of this system may be analyzed using an equivalent circuit. 7 refs., 5 figs

  18. Indices for planning wind power generation; Furyoku hatsuden no keikaku shihyo

    Energy Technology Data Exchange (ETDEWEB)

    Takeuchi, H

    1997-11-25

    Outlined herein are status of wind power generation development, indices for planning development, and actual development results. At present, wind power generates electric power of 6,781MW worldwide. USA has been rapidly developing wind power generation since enactment of the PURPA law, and accounted for 25% of the world output in the past. However, the county is recently unseated from the world top position by Germany, which has been extensively developing wind power generation since enactment of the EFL law to reach 1,799MW. In Japan, electric power companies, local governments and public institutions have been positively introducing wind mills since 1992, when Tohoku Electric Power Co. built Ryuhi Wind Park, now generating a total power of 15MW by 64 units located at 33 different points. According to the surveys by NEDO on wind conditions, there are a number of districts suited for wind mills in Hokkaido, Tohoku, Okinawa and sea areas in Honshu. The indices described herein for planning wind power generation include rotor diameter, tower height, speed of rotation, weight, power to be generated, utilization and service factors, noise level, and investment and running costs. In the present state of the development of wind power generation in Japan, development points are 33, generated ouptut 15,097kW and units 64. 14 figs.

  19. TFTR generator load assessment

    International Nuclear Information System (INIS)

    Heck, F.M.

    1975-10-01

    Typical experimental load demands on the TFTR generators are illustrated based on the electrical characteristics of the field coils, the coil leads, the main bus work, the various auxiliary bus work, the rectifiers, and transformers. The generator MW capacities are shown to be adequate for the proposed experimental operations with allowances made for variations in the final designs. The generator MVA capacities are shown to be adequate provided portions of the TF and EF rectifiers are freewheeled at selected times

  20. Design features of Beijing Shijingshan 3 x 200 MW cogeneration plant

    International Nuclear Information System (INIS)

    Li, T.X.; Ou, Y.Z.

    1991-01-01

    This paper describes the design feature of Beijing Shijingshan 3 x 200 MW Cogeneration Plant. The design optimized the scheme and system of 200 MW units for heating. The cogeneration plant has achieved comprehensive economic benefit in energy saving and environmental pollution reduction

  1. Modal Analysis on Fluid-Structure Interaction of MW-Level Vertical Axis Wind Turbine Tower

    Directory of Open Access Journals (Sweden)

    Tan Jiqiu

    2014-05-01

    Full Text Available In order to avoid resonance problem of MW-level vertical axis wind turbine induced by wind, a flow field model of the MW-level vertical axis wind turbine is established by using the fluid flow control equations, calculate flow’s velocity and pressure of the MW-level vertical axis wind turbine and load onto tower’s before and after surface, study the Modal analysis of fluid-structure interaction of MW-level vertical axis wind turbine tower. The results show that fluid-structure interaction field of MW- level vertical axis wind turbine tower has little effect on the modal vibration mode, but has a great effect on its natural frequency and the maximum deformation, and the influence will decrease with increasing of modal order; MW-level vertical axis wind turbine tower needs to be raised the stiffness and strength, its structure also needs to be optimized; In the case of satisfy the intensity, the larger the ratio of the tower height and wind turbines diameter, the more soft the MW-level vertical axis wind turbine tower, the lower its frequency.

  2. 600 MW nuclear power database

    International Nuclear Information System (INIS)

    Cao Ruiding; Chen Guorong; Chen Xianfeng; Zhang Yishu

    1996-01-01

    600 MW Nuclear power database, based on ORACLE 6.0, consists of three parts, i.e. nuclear power plant database, nuclear power position database and nuclear power equipment database. In the database, there are a great deal of technique data and picture of nuclear power, provided by engineering designing units and individual. The database can give help to the designers of nuclear power

  3. A miniaturized mW thermoelectric generator for nw objectives: continuous, autonomous, reliable power for decades.

    Energy Technology Data Exchange (ETDEWEB)

    Aselage, Terrence Lee; Siegal, Michael P.; Whalen, Scott; Frederick, Scott K.; Apblett, Christopher Alan; Moorman, Matthew Wallace

    2006-10-01

    We have built and tested a miniaturized, thermoelectric power source that can provide in excess of 450 {micro}W of power in a system size of 4.3cc, for a power density of 107 {micro}W/cc, which is denser than any system of this size previously reported. The system operates on 150mW of thermal input, which for this system was simulated with a resistive heater, but in application would be provided by a 0.4g source of {sup 238}Pu located at the center of the device. Output power from this device, while optimized for efficiency, was not optimized for form of the power output, and so the maximum power was delivered at only 41mV. An upconverter to 2.7V was developed concurrently with the power source to bring the voltage up to a usable level for microelectronics.

  4. Dragon project reference design assessment study for a 528 MW (E) thorium cycle high temperature gas cooled reactor

    International Nuclear Information System (INIS)

    Hosegood, S.B.

    1967-05-01

    The report presents an assessment of the feasibility, safety and cost of a large nuclear power station employing a high temperature gas-cooled reactor. A thermal output 1250 MW was chosen for the study, resulting in a net electrical output of 528.34 MW from a single reactor station, or 1056.7 MW from a twin reactor station. A reference design has been developed and is described. The reactor uses a U-235/Th-232/U-233 fuel cycle, on a feed and breed basis. It is believed that such a reactor could be built at an early date, requiring only a relatively modest development programme. Building costs are estimated to be Pound46.66/kW for a single unit station and Pound42.6/kW for a twin station, with power generation costs of 1.67p/kWh and 1.50p/kWh respectively. Optimisation studies have not been carried out and it should be possible to improve on the costs. The design has been made as flexible as possible to allow units of smaller or larger outputs to be designed with a minimum of change. (U.K.)

  5. Accelerator magnet power supply using storage generator

    International Nuclear Information System (INIS)

    Karady, G.; Thiessen, H.A.

    1987-01-01

    Recently, a study investigated the feasibility of a large, 60 GeV accelerator. This paper presents the conceptual design of the magnet power supply (PS() and energy storage system. The main ring magnets are supplied by six, high-voltage and two, low-voltage power supplies. These power supplies drive a trapezoidal shaped current wave through the magnets. The peak current is 10 kA and the repetition frequency is 3.3 Hz. During the acceleration period the current is increased from 1040 A to 10,000 A within 50 msec which requires a loop voltage of 120 kV and a peak power of 1250 MW. During the reset period, the PS operates as an inverter with a peak power of -1250 MW. The large energy fluctuation necessitates the use of a storage generator. Because of the relatively high operation frequency, this generator operates in a transient mode which significantly increases the rotor current and losses. The storage generator is directly driven by a variable speed drive, which draws a practically constant power of 17 MW from the ac supply network and eliminates the pulse loading. For the reduction of dc ripple, the power supplies operate in a 24 pulse mode

  6. Analysis of a prototype of a novel 1.5 MW, 170 GHz coaxial cavity gyrotron

    International Nuclear Information System (INIS)

    Rzesnicki, T.

    2007-06-01

    A 170 GHz, 2 MW coaxial cavity gyrotron is under development at the Institut fuer Hochleistungsimpuls- und Mikrowellentechnik (IHM) at Forschungszentrum Karlsruhe (FZK) which will be used as a high power microwave source for heating, current drive and stability control of plasmas in the International Thermonuclear Experimental Reactor (ITER). At frequencies above about 100 GHz the output power of conventional gyrotrons with cylindrical hollow waveguide cavities is limited to 1 MW in CW operation mainly due to the high Ohmic losses and the space charge voltage depression of the electron beam. The coaxial geometry enables a reduction of the mode competition in the gyrotron resonator and decreases also the influence of the beam voltage depression. As result a very high order operating mode (for example TE34,19 at 170 GHz) can be chosen which ultimately allows to increase the output power of the gyrotron in CW operation to a value as high as 2 MW. A first prototype of the 170 GHz, 2 MW coaxial cavity gyrotron has been designed, built and experimentally tested in short pulse operation at FZK. The main goal of this work was to investigate experimentally the design of the critical gyrotron components such as electron gun, resonator and a quasi-optical RF system. Those components are same as used in the first industrial coaxial prototype gyrotron for ITER. During the experiments a strong instability was observed inside the gyrotron tube due to the excitation of parasitic low frequency oscillations. The mechanism of the oscillations has been studied and possibilities for their suppression of these oscillations are proposed and experimentally verified. The RF output system is one of the most critical components. It is responsible for the coupling of the gyrotron power out of the gyrotron by converting the microwave power generated in the TE 34,19 -mode into a fundamental free space TEM 0,0 ''Gaussian'' mode. The performance of the RF output system has been tested in low

  7. Start-up analysis of INET-5 MW district heating prototype reactor

    International Nuclear Information System (INIS)

    Li Tianshu

    1991-09-01

    The main features and thermohydraulic design parameters of the INET-5 MW reactor (INET: Institute of Nuclear Technology of Tsinghua University, Beijing) are presented. The start-up process and the effect of thermohydraulic instability on start-up process have been analyzed. The main obstacle of start-up process of INET-5 MW reactor is to pass the instability region from 1 atm to normal operation condition. For avoiding instability, the start-up process should be divided into two steps. The results of three different start-up proposals calculated by DACOL code are given and compared. The possibility of instabilities for each proposal has been checked. The checked results show that there is no instability during start-up of the three proposals. So, it is supposed that the INET-5 MW reactor can safely and stably reach the operation conditions. Finally, some conclusions about the effect of instability on start-up in boiling mode of INET-5MW reactor are given

  8. Label-Free Biosensors Based on Bimodal Waveguide (BiMW) Interferometers.

    Science.gov (United States)

    Herranz, Sonia; Gavela, Adrián Fernández; Lechuga, Laura M

    2017-01-01

    The bimodal waveguide (BiMW) sensor is a novel common path interferometric transducer based on the evanescent field detection principle, which in combination with a bio-recognition element allows the direct detection of biomolecular interactions in a label-free scheme. Due to its inherent high sensitivity it has great potential to become a powerful analytical tool for monitoring substances of interest in areas such as environmental control, medical diagnostics and food safety, among others. The BiMW sensor is fabricated using standard silicon-based technology allowing cost-effective production, and meeting the requirements of portability and disposability necessary for implementation in a point-of-care (POC) setting.In this chapter we describe the design and fabrication of the BiMW transducer, as well as its application for bio-sensing purposes. We show as an example the biosensor capabilities two different applications: (1) the immunodetection of Irgarol 1051 biocide useful in the environmental field, and (2) the detection of human growth hormone as used in clinical diagnostics. The detection is performed in real time by monitoring changes in the intensity pattern of light exiting the BiMW transducer resulting from antigen-antibody interactions on the surface of the sensor.

  9. Next generation CANDU plants

    International Nuclear Information System (INIS)

    Hedges, K.R.; Yu, S.K.W.

    1998-01-01

    Future CANDU designs will continue to meet the emerging design and performance requirements expected by the operating utilities. The next generation CANDU products will integrate new technologies into both the product features as well as into the engineering and construction work processes associated with delivering the products. The timely incorporation of advanced design features is the approach adopted for the development of the next generation of CANDU. AECL's current products consist of 700MW Class CANDU 6 and 900 MW Class CANDU 9. Evolutionary improvements are continuing with our CANDU products to enhance their adaptability to meet customers ever increasing need for higher output. Our key product drivers are for improved safety, environmental protection and improved cost effectiveness. Towards these goals we have made excellent progress in Research and Development and our investments are continuing in areas such as fuel channels and passive safety. Our long term focus is utilizing the fuel cycle flexibility of CANDU reactors as part of the long term energy mix

  10. A 20 MW podded ship underwater electromagnetic signature - the alternative electric field; Signature electromagnetique sous-marine d'un paquebot de 20 MW a pods - le champ electrique alternatif

    Energy Technology Data Exchange (ETDEWEB)

    Lucas, B.; Henocq, H.; Rannou, C. [Delegation Generale pour l' Armement, DET/GESMA, 75 - Paris (France); Albert, Th.; Harpin, D. [ALSTOM Marine (France); Bourguet, S.; Guerin, P. [Institut de Recherche en Electrotechnique et Electronique de Nantes Atlantique, 44 (France)

    2006-03-15

    Today, electric podded propulsion is used for many ships, cruise liners and Navy vessels.This propulsion uses high currents in extremely low frequencies (ELFE); currents flow through electrical network, equipment and pods. These alternative currents could generate important underwater electromagnetic field. GESMA has to quantify the level of this field and its impact on the signature of this kind of ship. Then, GESMA carried out electromagnetic measurements using a multi-sensors underwater and autonomous facility named AMI. It was placed on the route of a 20 MW podded ship, at one hundred meters depth from the surface. Especially, AMI observed an alternative radiated electric field... (authors)

  11. Wind power: cost effective generation for the 1990s

    Energy Technology Data Exchange (ETDEWEB)

    Pedersen, T [Vestas Wind Systems A/S (Denmark)

    1989-01-01

    Wind power plants have been installed all over the world, notably in California and Denmark. Commercially available wind turbines today are rated from 50 KW to 1 MW with emphasis on the 1 MW range. As the fuel is ''free'' generating costs are identical to the capital, operation and maintenance costs of the plant. An estimate of the unit price of wind power generated electricity in Denmark is comparable to that generated by a coal fired plant. The main environmental impacts of a wind farm are considered. These are visual impact, noise emission, use of (agricultural) space and the impact on wildlife, mainly birds. Finally the installation of a wind farm and its connection to the grid are described. (3 figures, 1 table). (UK)

  12. Modal Analysis on Fluid-Structure Interaction of MW-Level Vertical Axis Wind Turbine Tower

    OpenAIRE

    Tan Jiqiu; Zhong Dingqing; Wang Qiong

    2014-01-01

    In order to avoid resonance problem of MW-level vertical axis wind turbine induced by wind, a flow field model of the MW-level vertical axis wind turbine is established by using the fluid flow control equations, calculate flow’s velocity and pressure of the MW-level vertical axis wind turbine and load onto tower’s before and after surface, study the Modal analysis of fluid-structure interaction of MW-level vertical axis wind turbine tower. The results show that fluid-structure interaction fie...

  13. Development of helium transfer coupling of 1 MW-class HTS motor for podded ship propulsion system

    Energy Technology Data Exchange (ETDEWEB)

    Kosuge, Eiji; Gocho, Yoshitsugu; Okumura, Kagao; Yamaguchi, Mitsugi [JapaneseSuperconductivity Organization, 135-8533, Tokyo (Japan); Umemoto, Katsuya; Aizawa, Kiyoshi; Yokoyama, Minoru; Takao, Satoru, E-mail: gocho@jso--new-scm.co.j [Kawasaki Heavy Industries LTD., 673-8666, Hyogo (Japan)

    2010-06-01

    Research and development of 1 MW superconducting motor are being made aiming at the efficiency improvement for the podded type ship propulsion. The basic machine configuration is similar to steam turbine generators, having a rotating horizontal shaft. As for the motor composed of rotating superconducting field, one of the most critical issues is to provide a technically viable helium transfer coupling (HTC). The field winding of 1 MW motor is cooled with cryogenic helium gas. The HTC needs to supply the cryogenic helium gas with an appropriate flow rate from the stationary part to the rotating field winding region through a hollowed shaft in order not to lose superconducting state of the winding. A full size prototype of HTC was developed prior to the actual one to demonstrate its technical acceptability. The fundamental data with regard to the supply of the refrigerated helium gas were successfully obtained at the rated speed. This work has been supported by New Energy, and Industrial Technology Development Organization (NEDO).

  14. Copper anode corrosion affects power generation in microbial fuel cells

    KAUST Repository

    Zhu, Xiuping

    2013-07-16

    Non-corrosive, carbon-based materials are usually used as anodes in microbial fuel cells (MFCs). In some cases, however, metals have been used that can corrode (e.g. copper) or that are corrosion resistant (e.g. stainless steel, SS). Corrosion could increase current through galvanic (abiotic) current production or by increasing exposed surface area, or decrease current due to generation of toxic products from corrosion. In order to directly examine the effects of using corrodible metal anodes, MFCs with Cu were compared with reactors using SS and carbon cloth anodes. MFCs with Cu anodes initially showed high current generation similar to abiotic controls, but subsequently they produced little power (2 mW m-2). Higher power was produced with microbes using SS (12 mW m-2) or carbon cloth (880 mW m-2) anodes, with no power generated by abiotic controls. These results demonstrate that copper is an unsuitable anode material, due to corrosion and likely copper toxicity to microorganisms. © 2013 Society of Chemical Industry.

  15. Copper anode corrosion affects power generation in microbial fuel cells

    KAUST Repository

    Zhu, Xiuping; Logan, Bruce E.

    2013-01-01

    Non-corrosive, carbon-based materials are usually used as anodes in microbial fuel cells (MFCs). In some cases, however, metals have been used that can corrode (e.g. copper) or that are corrosion resistant (e.g. stainless steel, SS). Corrosion could increase current through galvanic (abiotic) current production or by increasing exposed surface area, or decrease current due to generation of toxic products from corrosion. In order to directly examine the effects of using corrodible metal anodes, MFCs with Cu were compared with reactors using SS and carbon cloth anodes. MFCs with Cu anodes initially showed high current generation similar to abiotic controls, but subsequently they produced little power (2 mW m-2). Higher power was produced with microbes using SS (12 mW m-2) or carbon cloth (880 mW m-2) anodes, with no power generated by abiotic controls. These results demonstrate that copper is an unsuitable anode material, due to corrosion and likely copper toxicity to microorganisms. © 2013 Society of Chemical Industry.

  16. Structural Considerations of a 20MW Multi-Rotor Wind Energy System

    International Nuclear Information System (INIS)

    Jamieson, P; Branney, M

    2014-01-01

    The drive to upscale offshore wind turbines relates especially to possiblereductions in O and M and electrical interconnection costs per MW of installed capacity.Even with best current technologies, designs with rated capacity above about 3 MW are less cost effective exfactory per rated MW(turbine system costs) than smaller machines.Very large offshore wind turbines are thereforejustifiedprimarily by overall offshore project economics. Furthermore, continuing progress in materials and structures has been essential to avoid severe penalties in the power/mass ratio of large multi-MW machines.The multi-rotor concept employs many small rotors to maximise energy capture area withminimum systemvolume. Previous work has indicated that this can enablea very large reduction in the total weight and cost of rotors and drive trains compared to an equivalent large single rotor system.Thus the multi rotor concept may enable rated capacities of 20 MW or more at a single maintenancesite. Establishing the cost benefit of a multi rotor system requires examination of solutions for the support structure and yawing, ensuring aerodynamic losses from rotor interaction are not significant and that overall logistics, with much increased part count (more reliable components) and less consequence of single failuresare favourable. This paper addresses the viability of a support structure in respect of structural concept and likely weight as one necessary step in exploring the potential of the multi rotor concept

  17. Structural Considerations of a 20MW Multi-Rotor Wind Energy System

    Science.gov (United States)

    Jamieson, P.; Branney, M.

    2014-12-01

    The drive to upscale offshore wind turbines relates especially to possiblereductions in O&M and electrical interconnection costs per MW of installed capacity.Even with best current technologies, designs with rated capacity above about 3 MW are less cost effective exfactory per rated MW(turbine system costs) than smaller machines.Very large offshore wind turbines are thereforejustifiedprimarily by overall offshore project economics. Furthermore, continuing progress in materials and structures has been essential to avoid severe penalties in the power/mass ratio of large multi-MW machines.The multi-rotor concept employs many small rotors to maximise energy capture area withminimum systemvolume. Previous work has indicated that this can enablea very large reduction in the total weight and cost of rotors and drive trains compared to an equivalent large single rotor system.Thus the multi rotor concept may enable rated capacities of 20 MW or more at a single maintenancesite. Establishing the cost benefit of a multi rotor system requires examination of solutions for the support structure and yawing, ensuring aerodynamic losses from rotor interaction are not significant and that overall logistics, with much increased part count (more reliable components) and less consequence of single failuresare favourable. This paper addresses the viability of a support structure in respect of structural concept and likely weight as one necessary step in exploring the potential of the multi rotor concept.

  18. Conceptual design of a demonstration reactor for electric power generation

    International Nuclear Information System (INIS)

    Asaoka, Y.; Hiwatari, R.; Okano, K.; Ogawa, Y.; Ise, H.; Nomoto, Y.; Kuroda, T.; Mori, S.; Shinya, K.

    2005-01-01

    Conceptual study on a demonstration plant for electric power generation, named Demo-CREST, was conducted based on the consideration that a demo-plant should have capacities both (1) to demonstrate electric power generation in a plant scale with moderate plasma performance, which will be achieved in the early stage of the ITER operation, and foreseeable technologies and materials and (2) to have a possibility to show an economical competitiveness with advanced plasma performance and high performance blanket systems. The plasma core was optimized to be a minimum size for both net electric power generation with the ITER basic plasma parameters and commercial-scale generation with advance plasma parameters, which would be attained by the end of ITER operation. The engineering concept, especially the breeding blanket structure and its maintenance scheme, is also optimized to demonstrate the tritium self-sustainability and maintainability of in-vessel components. Within the plasma performance as planned in the present ITER program, the net electric power from 0 MW to 500 MW is possible with the basic blanket system under the engineering conditions of maximum magnetic field 16 T, NBI system efficiency 50%, and NBI current drive power restricted to 200 MW. Capacities of stabilization of reversed shear plasma and the high thermal efficiency are additional factors for optimization of the advanced blanket. By replacing the blanket system with the advanced one of higher thermal efficiency, the net electric power of about 1000 MW is also possible so that the economic performance toward the commercial plant can be also examined with Demo-CREST. (author)

  19. Aero-Elastic Optimization of a 10 MW Wind Turbine

    DEFF Research Database (Denmark)

    Zahle, Frederik; Tibaldi, Carlo; Verelst, David Robert

    2015-01-01

    This article describes a multi-disciplinary optimization and analysis tool for wind turbines that is based on the open-source framework OpenMDAO. Interfaces to several simulation codes have been implemented which allows for a wide variety of problem formulations and combinations of models....... In this article concurrent aeroelastic optimization of a 10 MW wind turbine rotor is carried out with respect to material distribution distribution and planform. The optimizations achieve up to 13% mass reduction while maintaining the same power production compared to the baseline DTU 10MW RWT....

  20. Short Circuits of a 10 MW High Temperature Superconducting Wind Turbine Generator

    NARCIS (Netherlands)

    Song, X.; Polinder, H.; Liu, D.; Mijatovic, Nenad; Holbøll, Joachim; Jensen, Bogi Bech

    Direct drive high temperature superconducting (HTS) wind turbine generators have been proposed to tackle challenges for ever increasing wind turbine ratings. Due to smaller reactances in HTS generators, higher fault currents and larger transient torques could occur if sudden short circuits happen at

  1. Impulse pumping modelling and simulation

    International Nuclear Information System (INIS)

    Pierre, B; Gudmundsson, J S

    2010-01-01

    Impulse pumping is a new pumping method based on propagation of pressure waves. Of particular interest is the application of impulse pumping to artificial lift situations, where fluid is transported from wellbore to wellhead using pressure waves generated at wellhead. The motor driven element of an impulse pumping apparatus is therefore located at wellhead and can be separated from the flowline. Thus operation and maintenance of an impulse pump are facilitated. The paper describes the different elements of an impulse pumping apparatus, reviews the physical principles and details the modelling of the novel pumping method. Results from numerical simulations of propagation of pressure waves in water-filled pipelines are then presented for illustrating impulse pumping physical principles, and validating the described modelling with experimental data.

  2. 1000 MW steam turbine for nuclear power station

    International Nuclear Information System (INIS)

    Drahy, J.

    1987-01-01

    Skoda Works started the manufacture of the 1000 MW steam turbine for the Temelin nuclear power plant. The turbine will use saturated steam at 3,000 r.p.m. It will allow steam supply to heat water for district heating, this of an output of 893 MW for a three-stage water heating at a temperature of 150/60 degC or of 570 MW for a two-stage heating at a temperature of 120/60 degC. The turbine features one high-pressure and three identical low-pressure stages. The pressure gradient between the high-pressure and the low-pressure parts was optimized as concerns the thermal efficiency of the cycle and the thermodynamic efficiency of the low-pressure part. A value of 0.79 MPa was selected corresponding to the maximum flow rate of the steam entering the turbine. This is 5,495 t/h, the admission steam parameters are 273.3 degC and 5.8 MPa. The feed water temperature is 220.9 degC. It is expected that throughout the life of the turbine, there will be 300 cold starts, 1,000 starts following shutdown for 55 to 88 hours, and 600 starts following shutdown for 8 hours. (Z.M.). 8 figs., 1 ref

  3. Main trends of upgrading the 1000 MW steam turbine

    International Nuclear Information System (INIS)

    Drahy, J.

    1990-01-01

    Parameters are compared for the 1000 MW steam turbine manufactured by the Skoda Works, Czechoslovakia, and turbines in the same power range by other manufacturers, viz. ABB, Siemens/KWU, GEC and LMZ. The Skoda turbine compares well with the other turbines with respect to all design parameters, and moreover, enables the most extensive heat extraction for district heating purposes. The main trends in upgrading this turbine are outlined; in particular, they include an additional increase in the heat extraction, which is made possible by a new design of the low-pressure section or by using a ''satellite'' turbine. The studies performed also indicate that the output of the full-speed saturated steam turbine can be increased to 1300 MW. An experimental turbine representing one flow of the high-pressure part of the 1000 MW turbine is being built on the 1:1 scale. It will serve to verify the methods of calculation of the wet steam flow and to experimentally test the high-pressure part over a wide span of the parameters. (Z.M.). 1 tab., 3 figs., 7 refs

  4. Superconducting Gravimeters Detect Gravity Fluctuations Induced by Mw 5.7 Earthquake Along South Pacific Rise Few Hours Before the 2011 Mw 9.0 Tohoku-Oki Earthquake

    Directory of Open Access Journals (Sweden)

    Keliang Zhang Jin Ma

    2014-01-01

    Full Text Available Gravity changes sometimes appear before a big earthquake. To determine the possible sources is important for recognizing the mechanism and further geodynamic studies. During the first two hours on March 11 before the Mw 9.0 Tohoku-Oki earthquake, the non-tidal gravity time series of superconducting gravimeters worldwide showed low-frequency (< 0.10 Hz fluctuations with amplitude of ~1 to 4 × 10-8 ms-2 lasting ~10 - 20 minutes. Through comparing global seismicity with the arrival times of seismic waves, we find that the fluctuations were induced by the Mw 5.7 earthquake that occurred at 0:14:54.68 at (53.27°S, 118.18°W along the eastern South Pacific Rise. Several body waves such as P, S are clearly recorded in the station with ~400 km distance to the hypocenter. The fluctuations are in response to the waves that propagate with a velocity of about 4 km s-1. Their amplitudes are proportional to the inverse of the epicentral distances even though the fluctuations of European sites were overlapped with waves associated with a smaller, i.e., Mw 2.6, event in Europe during this period. That is, the Mw 5.7 earthquake induced remarkable gravity fluctuations over long distances at stations all over the world. As such, the foreshocks with larger magnitudes occurred before the Mw 9.0 earthquake would have more significant influence on the gravity recordings and the seismic-wave induced component should be removed during the analysis of anomalies prior to a great earthquake in future studies.

  5. Environmental summary document for the Republic Geothermal, Inc. application for a geothermal loan guaranty project: 64 MW well field and 48 MW (net) geothermal power plant

    Energy Technology Data Exchange (ETDEWEB)

    Layton, D.W.; Powers, D.J.; Leitner, P.; Crow, N.B.; Gudiksen, P.H.; Ricker, Y.E.

    1979-07-01

    A comprehensive review and analysis is provided of the environmental consequences of (1) guaranteeing a load for the completion of the 64 MW well field and the 48 MW (net) power plant or (2) denying a guaranteed load that is needed to finish the project. Mitigation measures are discussed. Alternatives and their impacts are compared and some discussion is included on unavoidable adverse impacts. (MHR)

  6. Criticality and safety parameter studies for upgrading 3 MW TRIGA MARK II research reactor and validation of generated cross section library and computational method

    International Nuclear Information System (INIS)

    Bhuiyan, S.I.; Mondal, M.A.W.; Sarker, M.M.; Rahman, M.; Shahdatullah, M.S.; Huda, M.Q.; Chakrroborty, T.K.; Khan, M.J.H.

    2000-01-01

    This study deals with the neutronic and thermal hydraulic analysis of the 3MW TRIGA MARK II research reactor to upgrade it to a higher flux. The upgrading will need a major reshuffling and reconfiguration of the current core. To reshuffle the current core configuration, the chain of NJOY94.10 - WIMSD-5A - CITATION - PARET - MCNP4B2 codes has been used for the overall analysis. The computational methods, tools and techniques, customisation of cross section libraries, various models for cells and super cells, and a lot of associated utilities have been standardised and established/validated for the overall core analysis. Analyses using the 4-group and 7-group libraries of macroscopic cross sections generated from the 69-group WIMSD-5 library showed that a 7-group structure is more suitable for TRIGA calculations considering its LEU fuel composition. The MCNP calculations established that the CITATION calculations and the generated cross section library are reasonably good for neutronic analysis of TRIGA reactors. Results obtained from PARET demonstrated that the flux upgrade will not cause the temperature limit on the fuel to be exceeded. Also, the maximum power density remains, by a substantial margin below the level at which the departure from nucleate boiling could occur. A possible core with two additional irradiation channels around the CT is projected where almost identical thermal fluxes as in the CT are obtained. The reconfigured core also shows 7.25% thermal flux increase in the Lazy Susan. (author)

  7. GASIFICATION FOR DISTRIBUTED GENERATION

    Energy Technology Data Exchange (ETDEWEB)

    Ronald C. Timpe; Michael D. Mann; Darren D. Schmidt

    2000-05-01

    A recent emphasis in gasification technology development has been directed toward reduced-scale gasifier systems for distributed generation at remote sites. The domestic distributed power generation market over the next decade is expected to be 5-6 gigawatts per year. The global increase is expected at 20 gigawatts over the next decade. The economics of gasification for distributed power generation are significantly improved when fuel transport is minimized. Until recently, gasification technology has been synonymous with coal conversion. Presently, however, interest centers on providing clean-burning fuel to remote sites that are not necessarily near coal supplies but have sufficient alternative carbonaceous material to feed a small gasifier. Gasifiers up to 50 MW are of current interest, with emphasis on those of 5-MW generating capacity. Internal combustion engines offer a more robust system for utilizing the fuel gas, while fuel cells and microturbines offer higher electric conversion efficiencies. The initial focus of this multiyear effort was on internal combustion engines and microturbines as more realistic near-term options for distributed generation. In this project, we studied emerging gasification technologies that can provide gas from regionally available feedstock as fuel to power generators under 30 MW in a distributed generation setting. Larger-scale gasification, primarily coal-fed, has been used commercially for more than 50 years to produce clean synthesis gas for the refining, chemical, and power industries. Commercial-scale gasification activities are under way at 113 sites in 22 countries in North and South America, Europe, Asia, Africa, and Australia, according to the Gasification Technologies Council. Gasification studies were carried out on alfalfa, black liquor (a high-sodium waste from the pulp industry), cow manure, and willow on the laboratory scale and on alfalfa, black liquor, and willow on the bench scale. Initial parametric tests

  8. The new 6 MW industrial gas turbine from MAN; Die neue 6 MW Industriegasturbine von MAN

    Energy Technology Data Exchange (ETDEWEB)

    Beukenberg, M.; Wiedermann, A.; Orth, U.; Aschenbruck, E.; Reiss, F. [MAN Diesel und Turbo SE, Oberhausen (Germany)

    2010-07-01

    The development of a completely new series of gas turbines requires significant capital, resources and know-how. MAN Diesel and Turbo strategically decided to create a small gas turbine in the 6 MW-class. The construction of the Gas Turbine has been on the basis of opportunities in current and future markets and the positioning of the competition, this has determined the characteristics and technical parameters which have been optimised in the 6 MW design. The construction uses extremely high precision engineering so that the assembly of sub-components to modules is a smooth flowing process and can guarantee the high standards both quality and performance which MAN Diesel and Turbo are operating to. The individual components must be tested and thoroughly validated many months before actual assembly of the first machine. These include in particular the compressor of the gas turbine and the combustion chamber. The combustion system required special attention, since the emissions are strongly focused to satisfy stringent environmental requirements. The planned tests are a prerequisite for the construction of such a prototype and must be successfully completed before the Gas Turbine will be accepted into service. (orig.)

  9. Economical evaluation of electricity generation considering externalities

    International Nuclear Information System (INIS)

    El-Kordy, M.N.; Badr, M.A.; Abed, K.A.; Ibrahim, Said M.A.

    2002-01-01

    The economics of renewable energy are the largest barrier to renewable penetration. Nevertheless, the strong desire to reduce environmental emissions is considered a great support for renewable energy sources. In this paper, a full analysis for the cost of the kWh of electricity generated from different systems actually used in Egypt is presented. Also renewable energy systems are proposed and their costs are analyzed. The analysis considers the external cost of emissions from different generating systems. A proposed large scale PV plant of 3.3 MW, and a wind farm 11.25 MW grid connected at different sites are investigated. A life cycle cost analysis for each system was performed using the present value criterion. The comparison results showed that wind energy generation has the lowest cost, followed by a combined cycle-natural gas fired system. A photovoltaic system still uses comparatively expensive technology for electricity generation; even when external costs are considered the capital cost of photovoltaic needs to be reduced by about 60% in order to be economically competitive. (Author)

  10. Multi-MW target station: Beam Window Issues and Transverse Film Target

    CERN Document Server

    Herrera-Martinez, A

    The analysis of the EURISOL-DS Multi_MW target precise geometry has proved that large fission yields can be achieved with a 4 MW, providing a technically feasible design to evacuate the power deposited in the liquid mercury. Different designs for the mercury flow have been proposed, which maintain its temperature below the boiling point with moderate flow speeds (maximum 4 m/s).

  11. Operation of a 1.3 GHz, 10 MW Multiple Beam Klystron

    CERN Document Server

    Bohlen, H P; Cattelino, M; Cox, L; Cusick, M; Forrest, S; Friedlander, F; Staprans, A; Wright, E; Zitelli, L

    2004-01-01

    Results will be reported for a 1.3 GHz, 10 MW multiple beam klystron that is being developed for the TESLA linear accelerator facility. The design parameters for the device are 10 MW peak RF output power with 150 kW average power, 1.5 ms pulse length, 65% efficiency, 50 dB gain, and 2.0 A/cm2

  12. Facilitating major new generation in Alberta : an overview of the transmission infrastructure requirements

    International Nuclear Information System (INIS)

    2001-01-01

    There has been a growing interest in Alberta over the past year about building new generation. The three main areas under consideration are Fort McMurray, Edmonton, and Southern Alberta. Significant additional generation in these areas would inevitably create demands on the transmission infrastructure, which are examined in this report. It is difficult to predict what generation will be built over the next ten years, especially when several projects have not made it past the conceptual stage yet. Despite this difficulty, it is estimated that 6,500 MW of new generation will be added by 2010, based on the projects already announced and others. At off-peak periods, there would be a surplus capacity of almost 4,000 MW. Substantial upgrading of the transmission system in Alberta will be required if new generation is added, considering that the main transmission grid operates close to its maximum safe transfer limits for some periods. Significant improvements will be required for the transfer of the surplus generation from Fort McMurray to the main load centres of Southern Alberta (2,00 MW by 2010) and the Edmonton- Calgary corridor would also require updates. The estimated cost of these updates is 1.5 billion dollars. A prerequisite for many investors in new generation projects in Alberta is greater access to markets outside the province, and primarily to the western United States. Several options were examined in this report, from additional capacity through British Columbia, to a new route to Washington and Oregon via Montana, and a new route to Nevada and California. Some questions arise, such as whether the transmission infrastructure be built first or vice versa? The cost estimate for the direct line to Arizona/California for the export of 2,000 MW is 1.2 billion dollars. Close cooperation is required between planners and generation developers. 2 tabs., 6 figs

  13. Economic Analyses and Potential Market of the 200MW Nuclear Heating Reactor

    International Nuclear Information System (INIS)

    Wang, Yongqing; Wang, Guiying

    1992-01-01

    Based on the 5MW experimental nuclear heating reactor, Intent has developed a 200MW demonstration nuclear heating reactor. Owing to its simplified systems and low operating parameters, the NCR-200 has preferable investment in comparison with that of a nuclear power plant. The pre-feasibility studies for several cities in Northern China have shown that the heat cost of a NCR-200 can be competitive with a coal fired heating plant. As a safe, clean and economic heat source, the NCR could pose a large market in replacement of coal for heating. The R and D work performed up to now has demonstrated that the NCR-200 operating under the present parameters can supply low pressure steam for industrial process and co-generation to enhance it economic benefit. The NCR-200 could also serve a heat source for air condition by using Li Br refrigerator, this application is very interesting to some cities in Central and Southern China. The applications of the NCR in oil recovery by injecting hot water and transportation are very promising for some oil fields in North China. In addition, the study on sea water desalination using the NCR-200 is being carried out at present under international cooperation. All of these will expansion the possible application of the NCR. The paper presents the economic analysis and the potential market of the NCR-200

  14. Game theory competition analysis of reservoir water supply and hydropower generation

    Science.gov (United States)

    Lee, T.

    2013-12-01

    The total installed capacity of the power generation systems in Taiwan is about 41,000 MW. Hydropower is one of the most important renewable energy sources, with hydropower generation capacity of about 4,540 MW. The aim of this research is to analyze competition between water supply and hydropower generation in water-energy systems. The major relationships between water and energy systems include hydropower generation by water, energy consumption for water system operation, and water consumption for energy system. In this research, a game-theoretic Cournot model is formulated to simulate oligopolistic competition between water supply, hydropower generation, and co-fired power generation in water-energy systems. A Nash equilibrium of the competitive market is derived and solved by GAMS with PATH solver. In addition, a case study analyzing the competition among water supply and hydropower generation of De-ji and Ku-Kuan reservoirs, Taipower, Star Energy, and Star-Yuan power companies in central Taiwan is conducted.

  15. 1-MW klystron for fusion plasma heating

    International Nuclear Information System (INIS)

    Okamoto, Tadashi; Miyake, Setsuo; Ohno, Hiroaki

    1985-01-01

    A plasma test apparatus to bring about the critical plasma conditions for nuclear fusion is now under construction in Japan Atomic Energy Research Institute. Among various means of plasma heating, the most promising is the lower hybrid resonance heating (LHRF) in the 2-GHz region. Although it has so far requied 7 to 8 MW of microwave power for the plasma test apparatus, the new klystron, E3778, now constructed by Toshiba has the world's highest output power of 1 MW in the 2-GHz region. In addition to the excellent high-power operation for 10 seconds, the wide operating frequency range of 1.7 to 2.26 GHz by dint of sophisticated high-speed tuning mechanism, and the high durability to reflected power of up to 2.0 of VSWR are the high-lighted features of this klystron, which have never been achieved by conventional klystrons. (author)

  16. Performance of a 150-MW S-band klystron

    International Nuclear Information System (INIS)

    Sprehn, D.; Phillips, R.M.; Caryotakis, G.

    1994-09-01

    As part of an international collaboration, the Stanford Linear Accelerator Center (SLAC) klystron group has designed, fabricated, and tested a 60-Hz, 3-μs, 150-MW S-band klystron built for Deutsches Elektronen Synchrotron (DESY). A test diode with a 535-kV, 700-A electron beam was constructed to verify the gun operation. The first klystron was built and successfully met design specifications. The 375-MW electron beam represents a new record for SLAC accelerator klystrons in terms of voltage, current, energy, and ruggedness of design. The rf output power is a 150% increase over the S-band tubes currently used in the two-mile-long linear accelerator at SLAC. This paper discusses design issues and experimental results of the diode and klystron

  17. Engineering design of the EURISOL multi-MW spallation target

    CERN Document Server

    Herrera-Martínez, A; Ashrafi-Nik, M; Samec, K; Freibergs, J; Platacis, E

    2007-01-01

    The European Isotope Separation On-Line Radioactive Ion Beam project (EURISOL) is set to design the 'next-generation' European Isotope Separation On-Line (ISOL) Radioactive Ion Beam (RIB) facility. It will extend and amplify current research on nuclear physics, nuclear astrophysics and fundamental interactions beyond the year 2010. In EURISOL, four target stations are foreseen, three direct targets of approximately 100 kW of beam power and one multi-MW target assembly, all driven by a high-power particle accelerator. In this high power target station, high-intensity RIBs of neutron-rich isotopes will be obtained by inducing fission in several actinide targets surrounding a liquid metal spallation neutron source. This article summarises the work carried out within Task 2 of the EURISOL Design Study, with special attention to the coupled neutronics of the mercury proton-to-neutron converter and the fission targets. The overall performance of the facility, which will sustain fast neutron fluxes of the order of 1...

  18. Design of Jet lower hybrid current drive generator and operation of high power test bed

    International Nuclear Information System (INIS)

    Dobbing, J.A.; Bosia, G.; Brandon, M.; Gammelin, M.; Gormezano, C.; Jacquinot, J.; Jessop, G.; Lennholm, M.; Pain, M.; Sibley, A.

    1989-01-01

    The JET Lower Hybrid Current Drive (LHCD) generator consists of 24 klystrons each rated for 650 KW operating at 3.7 GHz, giving a nominal generator power of 15.6 MW for 10 seconds or 12 MW for 20 seconds. This power will be transmitted through 24 waveguides to a phased array launcher on one of the main ports of the JET machine. In addition, two klystrons are currently being operated on a high power test bed to establish reliable operation of the generators components and test high power microwave components prior to their installation

  19. Finite-fault slip model of the 2016 Mw 7.5 Chiloé earthquake, southern Chile, estimated from Sentinel-1 data

    Science.gov (United States)

    Xu, Wenbin

    2017-05-01

    Subduction earthquakes have been widely studied in the Chilean subduction zone, but earthquakes occurring in its southern part have attracted less research interest primarily due to its lower rate of seismic activity. Here I use Sentinel-1 interferometric synthetic aperture radar (InSAR) data and range offset measurements to generate coseismic crustal deformation maps of the 2016 Mw 7.5 Chiloé earthquake in southern Chile. I find a concentrated crustal deformation with ground displacement of approximately 50 cm in the southern part of the Chiloé island. The best fitting fault model shows a pure thrust-fault motion on a shallow dipping plane orienting 4° NNE. The InSAR-determined moment is 2.4 × 1020 Nm with a shear modulus of 30 GPa, equivalent to Mw 7.56, which is slightly lower than the seismic moment. The model shows that the slip did not reach the trench, and it reruptured part of the fault that ruptured in the 1960 Mw 9.5 earthquake. The 2016 event has only released a small portion of the accumulated strain energy on the 1960 rupture zone, suggesting that the seismic hazard of future great earthquakes in southern Chile is high.

  20. A comparative investigation of three PM-less MW power range wind generator topologies

    DEFF Research Database (Denmark)

    Bratiloveanu, Catalin-Rauti; Traian Cosmin Anghelus, Dumitru; Boldea, I.

    2012-01-01

    As the wind energy penetration range increases steadily and the high energy PM costs are rising dramatically, PM-less large power wind generators with high performance are needed. Apart from extending the range of cage rotor induction generators, doubly-fed induction generators and dc excited...... investigates by quasi 2D-FEM two dc stator polarized (to increase machine side PWM converter voltage utilization, that is to reduce peak kVA ratings and costs of the machine side PWM converter) directly-driven switched reluctance generators (one with circumferential field and one with transverse flux (with...... heteropolar-rotor (standard) synchronous generators, especially for direct drives (very low speed) and multibrid (with single stage transmission (5/1-8/1 ratio)), new topologies have to be investigated to reduce initial costs and weights for high enough efficiency and energy annual yield. The present paper...

  1. Renewable energy and sustainable communities: Alaska's wind generator experience.

    Science.gov (United States)

    Konkel, R Steven

    2013-01-01

    In 1984, the Alaska Department of Commerce and Economic Development (DCED) issued the State's first inventory/economic assessment of wind generators, documenting installed wind generator capacity and the economics of replacing diesel-fuel-generated electricity. Alaska's wind generation capacity had grown from hundreds of installed kilowatts to over 15.3 megawatts (MW) by January 2012. This article reviews data and conclusions presented in "Alaska's Wind Energy Systems; Inventory and Economic Assessment" (1). (Alaska Department of Commerce and Economic Development, S. Konkel, 1984). It provides a foundation and baseline for understanding the development of this renewable energy source. Today's technologies have evolved at an astonishing pace; a typical generator in an Alaska wind farm now is likely rated at 1.5-MW capacity, compared to the single-kilowatt (kW) machines present in 1984. Installed capacity has mushroomed, illustrated by Unalakleet's 600-kW wind farm dwarfing the original three 10-kW machines included in the 1984 inventory. Kodiak Electric had three 1.5-MW turbines installed at Pillar Mountain in 2009, with three additional turbines of 4.5-MW capacity installed in 2012. Utilities now actively plan for wind generation and compete for state funding. State of Alaska energy policy provides the context for energy project decision-making. Substantial renewable energy fund (REF) awards--$202,000,000 to date for 227 REF projects in the first 5 cycles of funding--along with numerous energy conservation programs--are now in place. Increasing investment in wind is driven by multiple factors. Stakeholders have interests both in public policy and meeting private investment objectives. Wind generator investors should consider project economics and potential impacts of energy decisions on human health. Specifically this article considers: changing environmental conditions in remote Alaska villages, impacts associated with climate change on human health, progress in

  2. A GIS policy approach for assessing the effect of fertilizers on the quality of drinking and irrigation water and wellhead protection zones (Crete, Greece).

    Science.gov (United States)

    Kourgialas, Nektarios N; Karatzas, George P; Koubouris, Georgios C

    2017-03-15

    Fertilizers have undoubtedly contributed to the significant increase in yields worldwide and therefore to the considerable improvement of quality of life of man and animals. Today, attention is focussed on the risks imposed by agricultural fertilizers. These effects include the dissolution and transport of excess quantities of fertilizer major- and trace-elements to the groundwater that deteriorate the quality of drinking and irrigation water. In this study, a map for the Fertilizer Water Pollution Index (FWPI) was generated for assessing the impact of agricultural fertilizers on drinking and irrigation water quality. The proposed methodology was applied to one of the most intensively cultivated with tree crops area in Crete (Greece) where potential pollutant loads are derived exclusively from agricultural activities and groundwater is the main water source. In this region of 215 km 2 , groundwater sampling data from 235 wells were collected over a 15-year time period and analyzed for the presence of anionic (ΝΟ -3 , PO -3 4 ) and cationic (K +1 , Fe +2 , Mn +2 , Zn +2 , Cu +2 , B +3 ) fertilizer trace elements. These chemicals are the components of the primary fertilizers used in local tree crop production. Eight factors/maps were considered in order to estimate the spatial distribution of groundwater contamination for each fertilizer element. The eight factors combined were used to generate the Fertilizer Water Pollution Index (FWPI) map indicating the areas with drinking/irrigation water pollution due to the high groundwater contamination caused by excessive fertilizer use. Moreover, by taking into consideration the groundwater flow direction and seepage velocity, the pathway through which groundwater supply become polluted can be predicted. The groundwater quality results show that a small part of the study area, about 8 km 2 (3.72%), is polluted or moderately polluted by the excessive use of fertilizers. Considering that in this area drinking water sources

  3. The removal of VOC from air using EB, MW and catalyst - Laboratory plant results

    International Nuclear Information System (INIS)

    Calinescu, I.; Ighigeanu, D.; Martin, D.

    2011-01-01

    A new hybrid technique for the VOCs removal from gases, based on the combined use of EB induced NTP (non-thermal plasma), MW induced NTP and catalytic oxidation, named “EB+MW-plasma catalysis”, is presented. The main goal of our research was to combine the features of each known technique used in gas pollution control, i.e. the very high efficiency of EB in converting VOCs to intermediate products, the ability of MW to produce and sustain NTP in large electrodeless reactors, and the important role of catalysts in the complete conversion to CO 2 and H 2 O. Our experiences shown that the two means of treating the gases are complementary: the catalytic oxidation in the presence of MW is efficient for high VOC initial concentrations and low flow rates while the exclusive use of the EB irradiation determines high decomposition efficiencies only in the case of very low concentrations of VOC but for large flow rates. Real synergistic effects between NTP and catalysis were obtained by introducing the catalyst into the irradiation zone. The main conclusion of this work is that the combined treatment EB+MW+catalyst improves both decomposition efficiency and oxidation efficiency. The EB+MW+Catalysis method demonstrated good results on a wide range of concentrations and flow rates. (author)

  4. Thermal-hydraulic design of the 200 MW NHR

    International Nuclear Information System (INIS)

    Li Jincai; Gao Zuying; Xu Baocheng; He Junxiao

    1997-01-01

    The thermal hydraulic design of the 200-MW Nuclear Heating Reactor (NHR), design criteria, design methods, important characteristics and some development results are presented in this paper. (author). 5 refs, 8 figs, 2 tabs

  5. Thermal-hydraulic design of the 200 MW NHR

    Energy Technology Data Exchange (ETDEWEB)

    Jincai, Li; Zuying, Gao; Baocheng, Xu; Junxiao, He [Institute of Nuclear Energy and Technology, Tsingua Univ., Beijing (China)

    1997-09-01

    The thermal hydraulic design of the 200-MW Nuclear Heating Reactor (NHR), design criteria, design methods, important characteristics and some development results are presented in this paper. (author). 5 refs, 8 figs, 2 tabs.

  6. Seismic quiescence before the 2016 Mw 6.0 Amatrice earthquake, central Italy

    Science.gov (United States)

    Di Giovambattista, R.; Gentili, S.; Peresan, A.

    2017-12-01

    Seismic quiescence before major worldwide earthquakes has been reported by many authors. We have analyzed the seismicity preceding the last damaging 2016-2017 seismic sequence occurred in central Italy, and we have characterized the temporal and spatial extension of the foregoing seismic quiescence. The multiple mainshock sequence (24/08/2016, Mw 6.0; 26/10/2016 Mw 5.4 and 5.9; 30/10/2016, Mw 6.5), which occurred in central Italy, caused the death of nearly 300 people and widespread destruction of entire villages. The Mw 6.5 earthquake was the most powerful recorded in Italy since the 1980 M 6.9 Irpinia earthquake. The Region-Time-Length (RTL) method has been used to quantitatively analyze the seismic quiescence preceding the first Mw 6.0 Amatrice mainshock. This analysis was performed using the earthquake catalogue maintained by the Istituto Nazionale di Geofisica e Vulcanologia (INGV) declustered using a novel statistical approach, which is based on the "nearest-neighbor" distances between pairs of earthquakes in the space-time-energy domain. A well-evident quiescence that preceded the sequence was detected. The quiescence extended throughout a broad region north of the epicenter. The largest event of the sequence and its aftershocks covered most of the quiescence region, except for a small area to the west. The quiescence started from the beginning of September 2015 and lasted for approximately 1 year, up to the Amatrice mainshock. The results obtained have been compared with those of previous seismic sequences occurred in Italy. A similar analysis applied to the 1997-1998, Mw 5.7 Umbria-Marche earthquakes located at the northern termination of the Amatrice sequence, showed a decrease in RTL corresponding to a seismic quiescence, followed by a foreshock activation in the epicentral area before the occurrence of the mainshock.

  7. Conceptual design of a 24--32 MW radially-cooled insert for a ≥45 T hybrid system

    International Nuclear Information System (INIS)

    Weggel, R.J.; Hake, M.E.; Stejskal, V.

    1994-01-01

    The FBNML is designing and will fabricate a radially-cooled insert magnet to generate 70% of the field of a system, Hybrid V, to surpass 45 T in a 32 mm bore. The insert is to have an overall diameter and a maximum active coil length of 610 mm. With a background field of 14 T the system should generate 47 T at 24 MW and nearly 49 T at 32 MW. The peak stress is extremely high, calling for conductors such as Be-Cu (UNS C17510) and 24% Ag-Cu with strengths up to 1,100 MPa. The peak heat flux density also is high, nearly 12 W/mm 2 . Because the water is coldest and its velocity highest where the heat flux is highest, however, the peak temperature is only 80 C. The water flow is ∼ 200 l/s at 27 atm. The system is to be very user friendly. Access is completely unobstructed at the top. Insert removal leaves the plumbing and electrical connections intact. The massive and expensive outer coils should be long lived, the inner coil easily replaceable. During an inner coil burnout, a sleeve intercepts arcing from the inner coil to the middle one, reducing burnout severity and fault loads. The insert should be a worthy successor to those of the FBNML's world-record holding systems, Hybrids II and III

  8. Natural gas and electricity generation in New South Wales

    International Nuclear Information System (INIS)

    Webb, G.

    2001-01-01

    In its Profile of the Australian Electricity Industry, ABARE noted that NSW was the first State in Australia to unbundle the operations of its State owned electricity industry. The process commenced in 1991, when the Electricity Commission of NSW was renamed Pacific Power and reorganised into six generation and transmission sectors. The power generation fuel mix for NSW in 1999-2000 was as follows: black coal, 97 percent and natural gas, 3 percent. NSW has also imported some brown coal generated electricity from Victoria in recent years. The import of cheap brown coal power from this State due to a marked increase in the availability of brown coal base-load generators in the Latrobe Valley forced some surplus black coal generating capacity in NSW to be withdrawn from the marketplace. Four generating units were closed down in 1998 two 500 MW units at Liddell and two 300 MW units at Munmorah. Further prospects for natural gas are reported to be good; its share in the thermal electricity generation market is forecasted to rise from 3 percent in 1999-2000 to 12 percent in 2014-1015

  9. Analysis of the malfunctioning and failure of a 15 MW hydraulic turbine; Analisis de malfuncionamiento y de falla de una turbina hidraulica de 15 MW

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Illescas, R.; Perez Rodriguez, N. [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2007-11-15

    A case history is presented of the rehabilitation process of three hydraulic turbines with a capacity of 15 MW each one. Such units are used for electric power generation, mainly to supply part of the center zone of the Mexican Republic. The turbo-generator units had been practically destroyed by catastrophic floods and only part of the equipment was recovered and reconditioned for its operation. One of the three turbines presented serious functioning problems preventing its reliable operation that was evidenced by excessive mechanical vibrations and heating in the bearing zone. This paper presents the diagnosis of the possible causes of failure and the corrective measures taken. Serious rotor misalignment problems were observed respect to its bearings and the turbine scroll. Additionally, during the inspection of the turbine runner and of the bearing it was observed that important friction have existed, which incremented the vibrations. It is shown that such rubbings are not the cause of the problem but only a manifestation of the same. Finally some of the conclusions and their solution are presented. [Spanish] Se presenta un caso historico del proceso de rehabilitacion de tres turbinas hidraulicas con capacidad de 15 MW cada una. Dichas unidades son empleadas en la generacion electrica, principalmente para abastecer parte de la zona centro de la republica mexicana. Las unidades turbogeneradores habian sido practicamente destruidas por inundaciones catastroficas y solo parte del equipo fue rescatado y rehabilitado para su operacion. Una de las tres turbinas presento graves problemas de funcionamiento, impidiendo su operacion confiable, lo cual se manifestaba mediante vibraciones mecanicas excesivas y calentamiento en zona de chumaceras. En este articulo se presenta el diagnostico de las posibles causas de falla y las acciones correctivas tomandas. Se observan problemas fuertes de desalineamiento del rotor respecto a sus chumaceras y al caracol de la turbina

  10. Analysis of the fault and malfunctioning of a 15 MW hydraulic turbine; Analisis de la falla y malfuncionamiento de una turbina hidraulica de 15 MW

    Energy Technology Data Exchange (ETDEWEB)

    Garcia I, Rafael; Perez R, Norberto [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2007-07-01

    An historical case of the rehabilitation process of three hydraulic turbines with capacity of 15 MW each is presented. These units are used for the electrical generation, mainly to supply part of the central zone of the Mexican Republic. The turbo-generator units had been practically destroyed by catastrophic floods and only part of the equipment was rescued and rehabilitated for its operation. One of the three turbines presented serious operational problems, preventing its reliable operation evidenced by the excessive mechanical vibrations and heating of the bearing zone. This article presents the diagnosis of the possible causes of fault and the remedial actions taken. Strong misalignment problems of the runner with respect to its bearings and to the scroll case of the turbine are observed. In addition, during the inspection of the turbine runner and of the bearings it is observed that important frictions have existed, which increased the vibrations. It is shown that these frictions are not the cause of the problem but only one manifestation of the same. Finally some conclusions of the problem and their solution are presented. [Spanish] Se presenta un caso historico del proceso de rehabilitacion de tres turbinas hidraulicas con capacidad de 15 MW cada una. Dichas unidades son empleadas en la generacion electrica, principalmente para abastecer parte de la zona centro de la Republica Mexicana. Las unidades turbogeneradores habian sido practicamente destruidas por inundaciones catastroficas y solo parte del equipo fue rescatado y rehabilitado para su operacion. Una de las tres turbinas presento graves problemas de funcionamiento, impidiendo su operacion confiable, lo cual se manifestaba mediante vibraciones mecanicas excesivas y calentamiento en zona de chumaceras. En este articulo se presenta el diagnostico de las posibles causas de falla y las acciones correctivas tomadas. Se observan problemas fuertes de desalineamiento del rotor respecto a sus chumaceras y al

  11. Physical degradation assessment of generator station cables

    International Nuclear Information System (INIS)

    Stonkus, D.J.

    1988-01-01

    Preliminary studies of fossil-fired and nuclear generator station cables indicate that the low voltage PVC insulated cables are in relatively good condition. The insulation is flexible and in the case of nuclear cables can withstand a design basis event after nearly 15 years of service. Cables insulated with styrene butadiene rubber have been found embrittled and cables insulated with SBR should be closely inspected in any plant assurance program. Thermal analysis using oxidative induction technique shows promise to indicate cable insulation degradation. Long term reliability assurance and plant life extension studies are being actively pursued at Ontario Hydro. A major study is currently underway to extend the life of the oldest operating fossil-fuel station, the 8-unit, 2400 MW Lakeview TGS in operation since the 1960s. Plant life assurance programs have been initiated at the 2000 MW Lambton TGS in operation since 1969, and for the oldest operating nuclear plant, Pickering NGS A in operation since the early 1970s. As cables are considered one of the critical components in a generator station due to the extreme difficulty and cost of cable replacement, test programs have been initiated to evaluate the physical degradation of the cables and relate the results to electrical diagnostic tests and to chemical changes. The decommissioning of two small nuclear stations, the 20 MW Nuclear Power Demonstration (NPD) and the 200 MW Douglas Point NGS, which were placed in service in 1962 and 1967 respectively, will provide an opportunity to perform destructive electrical and physical evaluation on field aged cables

  12. Experimental study of a 1 MW, 170 GHz gyrotron oscillator

    Science.gov (United States)

    Kimura, Takuji

    A detailed experimental study is presented of a 1 MW, 170 GHz gyrotron oscillator whose design is consistent with the ECH requirements of the International Thermonuclear Experimental Reactor (ITER) for bulk heating and current drive. This work is the first to demonstrate that megawatt power level at 170 GHz can be achieved in a gyrotron with high efficiency for plasma heating applications. Maximum output power of 1.5 MW is obtained at 170.1 GHz in 85 kV, 50A operation for an efficiency of 35%. Although the experiment at MIT is conducted with short pulses (3 μs), the gyrotron is designed to be suitable for development by industry for continuous wave operation. The peak ohmic loss on the cavity wall for 1 MW of output power is calculated to be 2.3 kW/cm2, which can be handled using present cooling technology. Mode competition problems in a highly over-moded cavity are studied to maximize the efficiency. Various aspects of electron gun design are examined to obtain high quality electron beams with very low velocity spread. A triode magnetron injection gun is designed using the EGUN simulation code. A total perpendicular velocity spread of less than 8% is realized by designing a low- sensitivity, non-adiabatic gun. The RF power is generated in a short tapered cavity with an iris step. The operating mode is the TE28,8,1 mode. A mode converter is designed to convert the RF output to a Gaussian beam. Power and efficiency are measured in the design TE28,8,1 mode at 170.1 GHz as well as the TE27,8,1 mode at 166.6 GHz and TE29,8,1 mode at 173.5 GHz. Efficiencies between 34%-36% are consistently obtained over a wide range of operating parameters. These efficiencies agree with the highest values predicted by the multimode simulations. The startup scenario is investigated and observed to agree with the linear theory. The measured beam velocity ratio is consistent with EGUN simulation. Interception of reflected beam by the mod-anode is measured as a function of velocity ratio

  13. Development of a 2 MW CW Waterload for Electron Cyclotron Heating Systems

    Energy Technology Data Exchange (ETDEWEB)

    R. Lawrence,Ives; Maxwell Mizuhara; George Collins; Jeffrey Neilson; Philipp Borchard

    2012-11-09

    Calabazas Creek Research, Inc. developed a load capable of continuously dissipating 2 MW of RF power from gyrotrons. The input uses HE11 corrugated waveguide and a rotating launcher to uniformly disperse the power over the lossy surfaces in the load. This builds on experience with a previous load designed to dissipate 1 MW of continuous RF power. The 2 MW load uses more advanced RF dispersion to double the capability in the same size device as the 1 MW load. The new load reduces reflected power from the load to significantly less than 1 %. This eliminates requirements for a preload to capture reflected power. The program updated control electronics that provides all required interlocks for operation and measurement of peak and average power. The program developed two version of the load. The initial version used primarily anodized aluminum to reduce weight and cost. The second version used copper and stainless steel to meet specifications for the ITER reactor currently under construction in France. Tests of the new load at the Japanese Atomic Energy Agency confirmed operation of the load to a power level of 1 MW, which is the highest power currently available for testing the load. Additional tests will be performed at General Atomics in spring 2013. The U.S. ITER organization will test the copper/stainless steel version of the load in December 2012 or early in 2013. Both loads are currently being marketed worldwide.

  14. Evaluating a kinematic method for generating broadband ground motions for great subduction zone earthquakes: Application to the 2003 Mw 8.3 Tokachi‐Oki earthquake

    Science.gov (United States)

    Wirth, Erin A.; Frankel, Arthur; Vidale, John E.

    2017-01-01

    We compare broadband synthetic seismograms with recordings of the 2003 Mw">MwMw 8.3 Tokachi‐Oki earthquake to evaluate a compound rupture model, in which slip on the fault consists of multiple high‐stress‐drop asperities superimposed on a background slip distribution with longer rise times. Low‐frequency synthetics (frequency (>1  Hz">>1  Hz>1  Hz) stochastic synthetics using a matched filter at 1 Hz. We show that this compound rupture model and overall approach accurately reproduces waveform envelopes and observed response spectral accelerations (SAs) from the Tokachi‐Oki event. We find that sufficiently short subfault rise times (i.e., ∼1  Hz∼1  Hz. This is achieved by either (1) including distinct subevents with short rise times, as may be suggested by the Tokachi‐Oki data, or (2) imposing a fast‐slip velocity over the entire rupture area. We also include a systematic study on the effects of varying several kinematic rupture parameters. We find that simulated strong ground motions are sensitive to the average rupture velocity and coherence of the rupture front, with more coherent ruptures yielding higher response SAs. We also assess the effects of varying the average slip velocity and the character (i.e., area, magnitude, and location) of high‐stress‐drop subevents. Even in the absence of precise constraints on these kinematic rupture parameters, our simulations still reproduce major features in the Tokachi‐Oki earthquake data, supporting its accuracy in modeling future large earthquakes.

  15. Meeting the economic objectives for the next generation of nuclear power plants

    International Nuclear Information System (INIS)

    Gerstenhaber, E.; Mahlab, M. A.

    1997-01-01

    The Westinghouse AP600 reactor is a 600 MW size, Advanced Light Water Reactor with passive designed safety systems. In its twin configuration, the AP600 delivers 1200 MW of power and is competitive with 1200 MW plant of evolutionary design with active safety system. Cost reduction occur with the AP600 compared to conventional technology because of passive safety systems that eliminates costly active safety equipment and piping. In addition, the second unit of a twin AP600 is constructed for 80% of the cost of the first unit because of cost savings from share facilities, multiple purchaser and learning curve effect. The AP600 with its modular construction is able to be constructed in five years compared to six years for a 1200 MW size plant. The twin AP600 brings one 600 MW unit on line one year early resulting in significant reduction in interest during construction and producing early cash flow for the project. Additionally the first unit generates cash flow during its first year of operation, reducing its equivalent investment compared to the larger unit. In total the twin AP600 more than makes up a theoretical 28% economy of scale advantage in unit capital cost for the large plant. Historical analysis is presented in the paper for electricity generation cost of Westinghouse U.S. 2-loop plants have operated for over twenty years each and are characterized by low operating cost and high availability and capacity factors. This experience of the low operating costs and high performance factors is anticipated for the AP600, and was modeled to derive life cycle electricity generation cost. (author)

  16. Verifying generator waste certification: NTS waste characterization QA requirements

    International Nuclear Information System (INIS)

    Williams, R.E.; Brich, R.F.

    1988-01-01

    Waste management activities managed by the US Department of Energy (DOE) at the Nevada Test Site (NTS) include the disposal of low-level wastes (LLW) and mixed waste (MW), waste which is both radioactive and hazardous. A majority of the packaged LLW is received from offsite DOE generators. Interim status for receipt of MW at the NTS Area 5 Radioactive Waste Management Site (RWMS) was received from the state of Nevada in 1987. The RWMS Mixed Waste Management Facility (MWMF) is expected to be operational in 1988 for approved DOE MW generators. The Nevada Test Site Defense Waste Acceptance Criteria and Certification Requirements (NVO-185, Revision 5) delineates waste acceptance criteria for waste disposal at the NTS. Regulation of the hazardous component of mixed waste requires the implementation of US Environmental Protection Agency (EPA) requirements pursuant to the Resource Conservation and Recovery Act (RCRA). Waste generators must implement a waste certification program to provide assurance that the disposal site waste acceptance criteria are met. The DOE/Nevada Operations Office (NV) developed guidance for generator waste certification program plans. Periodic technical audits are conducted by DOE/NV to assess performance of the waste certification programs. The audit scope is patterned from the waste certification program plan guidance as it integrates and provides a common format for the applicable criteria. The criteria focus on items and activities critical to processing, characterizing, packaging, certifying, and shipping waste

  17. The removal of VOC from air using EB, MW and catalyst - Laboratory plant results

    Energy Technology Data Exchange (ETDEWEB)

    Calinescu, I. [Polytechnic University, Bucharest (Romania); Ighigeanu, D.; Martin, D. [National Institute for Lasers, Plasma and Radiation Physics, Bucharest (Romania)

    2011-07-01

    A new hybrid technique for the VOCs removal from gases, based on the combined use of EB induced NTP (non-thermal plasma), MW induced NTP and catalytic oxidation, named “EB+MW-plasma catalysis”, is presented. The main goal of our research was to combine the features of each known technique used in gas pollution control, i.e. the very high efficiency of EB in converting VOCs to intermediate products, the ability of MW to produce and sustain NTP in large electrodeless reactors, and the important role of catalysts in the complete conversion to CO{sub 2} and H{sub 2}O. Our experiences shown that the two means of treating the gases are complementary: the catalytic oxidation in the presence of MW is efficient for high VOC initial concentrations and low flow rates while the exclusive use of the EB irradiation determines high decomposition efficiencies only in the case of very low concentrations of VOC but for large flow rates. Real synergistic effects between NTP and catalysis were obtained by introducing the catalyst into the irradiation zone. The main conclusion of this work is that the combined treatment EB+MW+catalyst improves both decomposition efficiency and oxidation efficiency. The EB+MW+Catalysis method demonstrated good results on a wide range of concentrations and flow rates. (author)

  18. Development of over-1 MW gyrotrons for the LHD and the GAMMA 10 ECH systems

    International Nuclear Information System (INIS)

    Imai, T.; Kariya, T.; Minami, R.

    2010-11-01

    For the ECH upgrade program of LHD and GAMMA10, over-1 MW power gyrotrons have been developed in the joint program of NIFS and University of Tsukuba. The gyrotrons for LHD and GAMMA 10 have TE 18,6 cavity and a diamond window at 77 GHz, and with TE 8,3 cavity at 28 GHz, respectively. The maximum outputs obtained are 1.9 MW for 0.1 s on the 77 GHz LHD tube and ∼ 1 MW on the 28 GHz one, which are the new records in these frequency ranges. The results of 1.8 MW for 1 s, 1.6 MW for 1.8s, 1 MW for 5 s, 300 kW for 40 min and 200 kW for 75 min were achieved at 77 GHz. In the long pulse operation, it is found that the stray RF is the major cause limiting the pulse length. Design improvements of the diffraction loss, the cavity and pitch factor α (=v sub(perpendicular)/v sub(parallel)) dispersion of the MIG have made the 77 GHz tube performance better, which have enabled to demonstrate 1.9 MW output and long pulse operation for more than 1 hour with 200 kW. The three 77 GHz gyrotrons have already been installed in the LHD ECH system and more than 3 MW has been injected into LHD plasma. In the 28 GHz long pulse operation, 400 kW for 1 sec has been obtained and it is found the higher and longer pulse operation would be possible with the operation optimization and conditioning. (author)

  19. Motor-Generator powering the PS (Proton Synchrotron) main magnets

    CERN Multimedia

    1983-01-01

    This motor-generator,30 MW peak, 1500 r.p.m.,pulsed power supply for the PS main magnet replaced in 1968 the initial 3000 r.p.m. motor-generator-flywheel set which had served from the PS start-up in 1959 until end 1967. See also photo 8302337 and its abstract.

  20. Design and operation of 140 GHz gyrotron oscillators for power levels up to 1 MW CW

    Energy Technology Data Exchange (ETDEWEB)

    Jory, H.; Bier, R.; Craig, L.J.; Felch, K.; Ives, L.; Lopez, N.; Spang, S.

    1986-12-01

    Varian has designed and tested 140 GHz gyrotron oscillators that have generated output powers of 100 kW CW and 200 kW for 1 ms pulses. Upcoming tubes will be designed to operate at power levels of 200 kW CW and ultimately up to 1 MW CW. The important design considerations which are addressed in the higher power tubes include the design of the electron gun, interaction circuit, and output window. These issues will be discussed and the results of the earlier 140 GHz gyrotron work at Varian will be summarized.

  1. Design and operation of 140 GHz gyrotron oscillators for power levels up to 1 MW CW

    International Nuclear Information System (INIS)

    Jory, H.; Bier, R.; Craig, L.J.; Felch, K.; Ives, L.; Lopez, N.; Spang, S.

    1986-12-01

    Varian has designed and tested 140 GHz gyrotron oscillators that have generated output powers of 100 kW CW and 200 kW for 1 ms pulses. Upcoming tubes will be designed to operate at power levels of 200 kW CW and ultimately up to 1 MW CW. The important design considerations which are addressed in the higher power tubes include the design of the electron gun, interaction circuit, and output window. These issues will be discussed and the results of the earlier 140 GHz gyrotron work at Varian will be summarized

  2. Relaxation on the Ismetpasa segment of the North Anatolian Fault after the Golcuk Mw = 7.4 and Duzce Mw = 7.2 shocks

    Directory of Open Access Journals (Sweden)

    E. Koksal

    2010-12-01

    Full Text Available The Ismetpasa segment of the North Anatolian Fault (NAF is a rare place where aseismic fault slip (creep has been observed. Its creep behaviour has been monitored using different observation methods since the 1950s. The findings obtained from the studies until 1990s showed that the creep rate exponentially decreased before the major shocks in 1999, Golcuk (Mw = 7.4 and Duzce (Mw = 7.2. After these shocks, three GPS periods observation in 2002, 2007 and 2008 were carried out on the geodetic network established around the segment. The evaluations of these observations showed that the creep behaviour relaxed after the major earthquakes. This result demonstrates that the creep behaviour of the Ismetpasa segment might be a warning before future major earthquakes.

  3. Development of L-band, 10MW multi beam klystron

    International Nuclear Information System (INIS)

    Irikura, M.; Miyake, S.; Yano, A.; Kazakov, S.; Larionov, A.; Teryaev, V.; Chin, Y.H.

    2004-01-01

    A 10-MW, L-band multi beam klystron (MBK) for TESLA linear collider and TESLA XFEL has been under development at Toshiba Electron Tubes and Devices Co., Ltd. (TETD) in collaboration with KEK. The TESLA requires pulsed klystrons capable of 10 MW output power at 1300 MHz with 1.5 ms pulse length and a repetition rate of 10 pps. The MBK with 6 low-perveance beams in parallel enables us to operate at lower cathode voltage with higher efficiency. The design work has been accomplished and the fabrication is under way. We are going to start conditioning and testing of prototype no.0 in the middle of July 2004. The design overview will be presented. (author)

  4. Changes in 900 MW PWR alarm processing policy

    Energy Technology Data Exchange (ETDEWEB)

    Pont, M [Electricite de France, Generation and Transmission, Nuclear Power Plant Operations, Paris (France)

    1997-09-01

    Following a brief description of the current 900 MW PWR alarm processing system, this document presents the feasibility study carried out within the scope of the Instrumentation and Control Refurbishment project (R2C). (author). 4 figs, tabs.

  5. Changes in 900 MW PWR alarm processing policy

    International Nuclear Information System (INIS)

    Pont, M.

    1997-01-01

    Following a brief description of the current 900 MW PWR alarm processing system, this document presents the feasibility study carried out within the scope of the Instrumentation and Control Refurbishment project (R2C). (author). 4 figs, tabs

  6. Statistical fault diagnosis of wind turbine drivetrain applied to a 5MW floating wind turbine

    DEFF Research Database (Denmark)

    Ghane, Mahdi; Nejad, Amir R.; Blanke, Mogens

    2016-01-01

    to prevent them to develop into failure, statistical change detection is used in this paper. The Cumulative Sum Method (CUSUM) is employed to detect possible defects in the downwind main bearing. A high fidelity gearbox model on a 5-MW spar-type wind turbine is used to generate data for fault-free and faulty...... conditions of the bearing at the rated wind speed and the associated wave condition. Acceleration measurements are utilized to find residuals used to indirectly detect damages in the bearing. Residuals are found to be nonGaussian, following a t-distribution with multivariable characteristic parameters...

  7. Internal Technical Report, Safety Analysis Report 5 MW(e) Raft River Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Brown, E.S.; Homer, G.B.; Spencer, S.G.; Shaber, C.R.

    1980-05-30

    The Raft River Geothermal Site is located in Southern Idaho's Raft River Valley, southwest of Malta, Idaho, in Cassia County. EG and G idaho, Inc., is the DOE's prime contractor for development of the Raft River geothermal field. Contract work has been progressing for several years towards creating a fully integrated utilization of geothermal water. Developmental progress has resulted in the drilling of seven major DOE wells. Four are producing geothermal water from reservoir temperatures measured to approximately 149 C (approximately 300 F). Closed-in well head pressures range from 69 to 102 kPa (100 to 175 psi). Two wells are scheduled for geothermal cold 60 C (140 F) water reinjection. The prime development effort is for a power plant designed to generate electricity using the heat from the geothermal hot water. The plant is designated as the ''5 MW(e) Raft River Research and Development Plant'' project. General site management assigned to EG and G has resulted in planning and development of many parts of the 5 MW program. Support and development activities have included: (1) engineering design, procurement, and construction support; (2) fluid supply and injection facilities, their study, and control; (3) development and installation of transfer piping systems for geothermal water collection and disposal by injection; and (4) heat exchanger fouling tests.

  8. Improvement of Candu-1000 MW(e) power cycle by moderator heat recovery

    International Nuclear Information System (INIS)

    Fath, H.E.S.

    1988-01-01

    Four different moderator heat recovery circuits are proposed for CANDU-1000 MW(e) reactors. The proposed circuits utilize all, or part, of the 155 MW(th) moderator heat load (at 70 0 C moderator outlet temperature from calandria) to the first stage of the feed water heating system. An economics study was carried out and indicated that the direct circulation of feed water through the moderator heat exchanger (with full heat recovery) is the most economical scheme. For this scheme the saved steam from the turbine extraction was found to produce additional electric power of 8 MW(e). This additional power represents a 0.7% increase in the plants nominal electric output. The outstanding features and advantages of the selected scheme are also presented. (author)

  9. The heating operational summarization in three winters of a 5 MW test heating reactor

    International Nuclear Information System (INIS)

    Wang Dazhong; Dong Duo; Su Qingshan; Zhang Yajun

    1992-09-01

    The 5 MW THR (5 MW test heating reactor) is a new type reactor with inherent safety developed by INET (Institute of Nuclear Energy Technology). It is the first 'pressure vessel type' heating reactor in operation in the world. It was put into operation in November, 1989. Since then it has operated for three winter seasons. The total operation time has reached to 8174 hours and its availability of heating has reached to 99%. The advanced technology of this reactor has been proved in the past three years operation. The characteristics of power regulating, load following, reactivity disturbance and the variation of parameters under the condition of ATWS (anticipated transients without scram) were studied with experiments in 5 MW THR. The 5 MW THR is an ideal heating reactor and has outstanding performances

  10. Development of a 5 MW reference gearbox for offshore wind turbines

    OpenAIRE

    Rasekhi Nejad, Amir; Guo, Yi; Gao, Zhen; Moan, Torgeir

    2016-01-01

    This paper presents detailed descriptions, modeling parameters and technical data of a 5MW high-speed gearbox developed for the National Renewable Energy Laboratory offshore 5MW baseline wind turbine. The main aim of this paper is to support the concept studies and research for large offshore wind turbines by providing a baseline gearbox model with detailed modeling parameters. This baseline gearbox follows the most conventional design types of those used in wind turbines. It is based on the ...

  11. FY 2000 report on the development of hydrothermal use power plant, etc. Development of the binary cycle power plant (Development of a 10MW class plant); 2000 nendo Nessui riyo hatsuden plant tou kaihatsu. Bainari cycle hatsuden plant no kaihatsu - 10MW kyu plant no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-01-01

    For the purpose of developing a 10MW class demonstrative plant for geothermal binary power generation, the R and D were carried out, and the results obtained from FY 1995 to FY 1999 were summed up. In the interim evaluation made in July 1994, study was to be phasedly proceeded with for the main three systems (hydrothermal system, medium system and power generation system) which compose the 10MW class binary cycle power plant. The test on the hydrothermal system was started in FY 1995. In the R and D, the following were conducted for evaluation: design/manufacture/installation of the test device for the hydrothermal system, manufacture of demonstrative downhole pump (DHP) No.3 and test at plant, test on the hydrothermal system. As to the turbine working medium suitable for binary power plant, the specified freon/substitute freon have been used, but it seems that hydrocarbons such as butane and pentane can be effective in future. In the study of the economical efficiency, it was pointed out that for the commercialization, it is important to improve durability of DHP and further reduce the cost of DHP equipment and cost of repairs. (NEDO)

  12. Five MW Nuclear Heating Reactor

    International Nuclear Information System (INIS)

    Zhang Dafang; Dong Duo; Su Qingshan

    1997-01-01

    The 5 MW Nuclear Heating Reactor (NHR-5) developed and designed by the Institute of Nuclear Energy Technology (INET) has been operated for four winter seasons since 1989. During the time of commissioning and operation a number of experiments including self-stability, self-regulation, and simulation of ATWS etc. were carried out. Some operating experiences such as water chemistry, radiation protection and environmental impacts and so on were also obtained at the same time. All of these results demonstrate the design of the NHR-5 is successful. (author). 9 refs, 11 figs, 5 tabs

  13. Five MW Nuclear Heating Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Dafang, Zhang; Duo, Dong; Qingshan, Su [Institute of Nuclear Energy and Technology, Tsingua Univ., Beijing (China)

    1997-09-01

    The 5 MW Nuclear Heating Reactor (NHR-5) developed and designed by the Institute of Nuclear Energy Technology (INET) has been operated for four winter seasons since 1989. During the time of commissioning and operation a number of experiments including self-stability, self-regulation, and simulation of ATWS etc. were carried out. Some operating experiences such as water chemistry, radiation protection and environmental impacts and so on were also obtained at the same time. All of these results demonstrate the design of the NHR-5 is successful. (author). 9 refs, 11 figs, 5 tabs.

  14. Micro-pulses generation in ECR breakdown stimulated by gyrotron radiation at 37,5 GHz

    International Nuclear Information System (INIS)

    Skalyga, V.; Zorin, V.; Izotov, I.; Golubev, S.; Razin, S.; Sidorov, A.; Vodopyanov, A.

    2012-01-01

    The present work is devoted to experimental and theoretical investigation of the creation of short pulsed (< 100 μs) multicharged ion beams. The possibility of quasi-stationary generation of short pulsed beams under conditions of quasi-gasdynamic plasma confinement was shown in recent experiments. Later another way of such beams creation based on the Pre-glow effect was proposed. In present work it was demonstrated that in the case when duration of microwave (MW) pulse is less than formation time of Pre-glow peak, realization of a regime when ion current is negligible during MW pulse and intense multicharged ions flux appears only when MW ends could be possible. Such pulses after the end of MW were called micro-pulses. In the present work the generation of micro-pulses was observed in experiments with ECR discharge stimulated by gyrotron radiation at 37,5 GHz, 100 kW. In this case pulses with duration less than 30 μs were obtained. Probably the same effect was observed in GANIL where 14 GHz radiation was used and pulses with duration about 2 ms were registered. In present work it was shown that the intensity of such micro-pulse could be higher than intensity of Pre-glow peak at the same conditions but with longer MW pulse. The generation of micro-pulses of nitrogen and argon multicharged ions with current of a few mA and length about 30 μs after MW pulse with duration of 30-100 μs was demonstrated. The low level of impurities, high current density and rather high average charge make possible to consider such micro-pulse regime as a possibility for the creation of a short pulsed ion source. The paper is followed by the slides of the presentation. (authors)

  15. Demonstration tokamak fusion power plant for early realization of net electric power generation

    International Nuclear Information System (INIS)

    Hiwatari, R.; Okano, K.; Asaoka, Y.; Shinya, K.; Ogawa, Y.

    2005-01-01

    A demonstration tokamak fusion power plant Demo-CREST is proposed as the device for early realization of net electric power generation by fusion energy. The plasma configuration for Demo-CREST is optimized to satisfy the electric breakeven condition (the condition for net electric power, P e net = 0 MW) with the plasma performance of the ITER reference operation mode. This optimization method is considered to be suitable for the design of a demonstration power plant for early realization of net electric power generation, because the demonstration power plant has to ensure the net electric generation. Plasma performance should also be more reliably achieved than in past design studies. For the plasma performance planned in the present ITER programme, net electric power from 0 to 500 MW is possible with Demo-CREST under the following engineering conditions: maximum magnetic field 16 T, thermal efficiency 30%, NBI system efficiency 50% and NBI current drive power restricted to 200 MW. By replacing the blanket system with one of higher thermal efficiency, a net electric power of about 1000 MW is also possible so that the performance of the commercial plant with Demo-CREST can also be studied from the economic point of view. The development path from the experimental reactor 'ITER' to the commercial plant 'CREST' through the demonstration power plant 'Demo-CREST' is proposed as an example of the fast track concept. (author)

  16. Increasing the Feasibility of Superconducting Generators for 10 MW Direct-Drive Wind Turbines

    NARCIS (Netherlands)

    Liu, D.

    2017-01-01

    In recent years, superconducting synchronous generators (SCSGs) have been proposed as an alternative to permanent magnet synchronous generators (PMSGs). They are expected to reduce the top head mass and the nacelle size for such large wind turbines. In 2012, the INNWIND.EU project initiated this

  17. French wind power generation programme EOLE 2005 - first results

    Energy Technology Data Exchange (ETDEWEB)

    Laali, A.R. [Electricite de France (EDF), Chatou (France); Benard, M. [Electricite de France (EDF), Paris (France)

    1997-12-31

    EOLE 2005 has been launched in July 1996 by the French Ministry of Industry, Electricite de France and ADEME (Agency for Environment and Energy Management). The Ministries of Research and Environment are participating also in this programme. The purpose is to create an initial market in France for wind power generation in order to evaluate the cost-effectiveness and the competitiveness of the wind energy compared to other energy sources by 2005. The installed capacity will reach at least 250 MW and possibly 500 MW.

  18. EURISOL-DS MULTI-MW TARGET ISSUES: BEAM WINDOW AND TRANSVERSE FILM TARGET

    CERN Document Server

    Adonai Herrera-Martínez, Yacine Kadi

    The analysis of the EURISOL-DS Multi_MW target precise geometry (Fig.1) has proved that large fission yields can be achieved with a 4 MW, providing a technically feasible design to evacuate the power deposited in the liquid mercury. Different designs for the mercury flow have been proposed, which maintain its temperature below the boiling point with moderate flow speeds (maximum 4 m/s).

  19. Power generation in South Africa

    International Nuclear Information System (INIS)

    Van der Walt, N.T.

    1976-01-01

    There have been extensive developments in the power supply industry in South Africa. The most evident of these has been the increase in the size of generating units. Escom has recently placed orders for 600 MW units. In South Africa, with its large indigenous reserves of cheap coal, there was no need to rush into a nuclear power programme before it would be economic and, accordingly the first serious study of nuclear power generation was not undertaken until 1966. A final aspect of power generation which is becoming very important is the control of pollution and protection of the environment

  20. Generators for gearless wind energy converters

    Energy Technology Data Exchange (ETDEWEB)

    Grauers, A. [Chalmers Univ. of Technology, Goeteborg (Sweden). Dept. of Electric Power Engineering

    1996-12-01

    This paper discusses some design alternatives for directly driven generators, and one specific generator type is investigated for a wide range of rated power. First, the specification for a directly driven generator is presented, then different design alternatives are discussed. A radial-flux permanent magnet generator for frequency converter connection has been chosen for a more detailed investigation. The design, optimization and performance of that generator type are presented. Generators from 30 kW to 3 MW are designed and compared with conventional four-pole generators with gear. It is found that a directly driven generator can be more efficient than a conventional generator and gear and have a rather small diameter and a low active weight. 8 refs, 7 figs, 2 tabs

  1. Stein industrie moisture separator reheaters in 900 MW and 1300 MW PWR units behaviour and feedback

    International Nuclear Information System (INIS)

    Guignard, S.; Gabrel, J.; Marceau, J.; Gauchet, J.P.

    1990-01-01

    Various metallurgical investigations were carried out with a view to making technological modifications to the Stein Industrie designed moisture separator reheaters of the 900 MW CP0/CP1 and 1300 MW P4/P'4 plant series. Dismantling and assessment of four reheater bundles from the CP0/CP1 plants revealed tube leaks at the bends and in the straight part of the bundle due chiefly to erosion-corrosion. In addition, thickness losses due to the same phenomenon were observed on the inner walls of the vessels and internal hardware in contact with wet steam. The assessments and inspections carried out in the field on the MSR bundles of the CP0 and CP1 plants confirmed the presence of erosion-corrosion, virtually stabilized to date, and revealed fouling of bends by sequestration of particles in the circuit with presence of some pitting. Fatigue cracking of the last support plate of certain MSRs of the CP0 series was also revealed. Adoption of finned tubes of 18% chrome ferritic stainless steel (Z 2 CT 18) for spare bundles and new MSRs, protection of vessels by austenitic and/or martensitic stainless steel internal hardware, modification of water conditioning in the steam-water circuit, and implementation of some technological modifications should guarantee the longterm resistance of the MSRs [fr

  2. Confirmation of hydroxyl radicals ({sup •} OH) generated in the presence of TiO{sub 2} supported on AC under microwave irradiation

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Zhaohong, E-mail: lnuhjhx@163.com [School of Environmental Science, Liaoning University, Shenyang 110036 (China); Yu, Fengyang; Huang, Lirong; Jiatieli, Jianaerguli; Li, Yuanyuan; Song, Lijun [School of Environmental Science, Liaoning University, Shenyang 110036 (China); Yu, Ning [Experiment Center of Environmental Monitoring of Liaoning Province, Shenyang 110161 (China); Dionysiou, Dionysios D., E-mail: dionysios.d.dionysiou@uc.edu [Environmental Engineering and Science Program, University of Cincinnati, Cincinnati, OH 45221-0012 (United States)

    2014-08-15

    Graphical abstract: - Highlights: • Generation of {sup •} OH in MW integrated with loaded TiO{sub 2}/AC system was confirmed. • Confirmation of {sup •} OH was conducted using radical scavenger such as BHT, MT and VC. • More {sup •} OH was formed using anatase TiO{sub 2}/AC than rutile TiO{sub 2}/AC under MW irradiation. • Effect of mass ratio, irradiation time, catalyst dose and DPCI on {sup •} OH was studied. - Abstract: In order to study the degradation mechanism of technology of microwave (MW) combined with TiO{sub 2} supported on activated carbon (TiO{sub 2}/AC), the reactive oxygen species (ROS) was explored through oxidation of 1,5-diphenyl carbazide (DPCI) to 1,5-diphenyl carbazone (DPCO). Furthermore, 2,6-di-tert-butyl-4-methylphenol (BHT), Mannitol (MT) and Vitamin C (VC) were used as radical scavengers to confirm the generation of the hydroxyl radicals ({sup •} OH). In addition, the influence of some parameters such as TiO{sub 2} mass ratio content, irradiation time, material dose, DPCI concentration and MW power on the determination of {sup •} OH were examined. The results showed that the {sup •} OH could be generated under MW combined with loaded TiO{sub 2}/AC. Also, anatase TiO{sub 2}/AC can generate more {sup •} OH radicals than rutile TiO{sub 2}/AC under MW irradiation. This work would provide new mechanistic insights on the enhanced degradation effect of organic pollutants in water using the supported TiO{sub 2}/AC coupled with MW technology.

  3. Source complexity of the May 20, 2012, Mw 5.9, Ferrara (Italy event

    Directory of Open Access Journals (Sweden)

    Davide Piccinini

    2012-10-01

    Full Text Available A Mw 3.9 foreshock on May 19, 2012, at 23:13 UTC, was followed at 02:03 on May 20, 2012, by a Mw 5.9 earthquake that hit a densely populated area in the Po Plain, west of the city of Ferrara, Italy (Figure 1. Over the subsequent 13 days, six Mw >5 events occurred; of these, the most energetic was a Mw 5.8 earthquake on May 29, 2012, 12 km WSW of the main shock. The tragic balance of this sequence was 17 casualties, hundreds of injured, and severe damage to the historical and cultural heritage of the area. From a seismological point of view, the 2012 earthquake was not an outstanding event in its regional context. The same area was hit in 1996 by a Mw 5.4 earthquake [Selvaggi et al. 2001], and previously in 1986 and in 1967 (DBMI11 [Locati et al. 2011]. The most destructive historical event was the 1570, Imax 8 event, which struck the town of Ferrara [Guidoboni et al. 2007, Rovida et al. 2011]. The 2012 seismic sequence lasted for several weeks and probably developed on a well-known buried thrust fault [Basili et al. 2008, Toscani et al. 2009, DISS Working Group 2010], at depths between 2 km and 10-12 km. […

  4. Power import or domestic power generation using gas?

    International Nuclear Information System (INIS)

    Saettler, M.; Bohnenschaefer, W.; Schlesinger, M.

    2001-01-01

    This report for the Swiss Federal Office of Energy (SFOE) presents expert opinion on the question of how Switzerland could meet its demands for power in the future. The results of the analysis of two options - the import of electrical power or its generation using natural-gas-fired power stations - made in the light of gas market liberalisation are presented. These include the assessment of the use of 'GuD' (combined gas and steam-turbine) power stations in the 100 MW e l to 400 MW e l class regarding their cost, their emissions and primary energy consumption. The authors discuss the assessments from the political and economic points of view. An appendix supplies characteristic data for 'GuD' power stations and an example of a model calculation for a 400 MW e l 'GuD' power station

  5. Gas revenue increasingly significant

    International Nuclear Information System (INIS)

    Megill, R.E.

    1991-01-01

    This paper briefly describes the wellhead prices of natural gas compared to crude oil over the past 70 years. Although natural gas prices have never reached price parity with crude oil, the relative value of a gas BTU has been increasing. It is one of the reasons that the total amount of money coming from natural gas wells is becoming more significant. From 1920 to 1955 the revenue at the wellhead for natural gas was only about 10% of the money received by producers. Most of the money needed for exploration, development, and production came from crude oil. At present, however, over 40% of the money from the upstream portion of the petroleum industry is from natural gas. As a result, in a few short years natural gas may become 50% of the money revenues generated from wellhead production facilities

  6. Mw 8.5 BENGKULU EARTHQUAKES FROM CONTINUOUS GPS DATA

    Directory of Open Access Journals (Sweden)

    W. A. W. Aris

    2016-09-01

    Full Text Available The Mw 8.5 Bengkulu earthquake of 30 September 2007 and the Mw8.6 28 March 2005 are considered amongst large earthquake ever recorded in Southeast Asia. The impact into tectonic deformation was recorded by a network of Global Positioning System (GPS Continuously Operating Reference Station (CORS within southern of Sumatra and west-coast of Peninsular Malaysia. The GPS data from the GPS CORS network has been deployed to investigate the characteristic of postseismic deformation due to the earthquakes. Analytical logarithmic and exponential function was applied to investigate the deformation decay period of postseismic deformation. This investigation provides a preliminary insight into postseismic cycle along the Sumatra subduction zone in particular and on the dynamics Peninsular Malaysia in general.

  7. Possibility of revitalization of control system of steam turbine 210 MW LMZ

    International Nuclear Information System (INIS)

    Racki, Branko

    2004-01-01

    It is a one-shaft, three casing condensing turbine, type K-210-130. A rigid coupling connects it directly to the electric energy generator. There is one intermediate superheat of steam and seven non regulated blending for regenerative condensate heating. A considerate number of such turbines have been used on the territory of the Eastern Europe. There are two blocks installed in TP Sisak, Croatia. There is a survey of the existing control system of turbine, power 210 MW. It points out and describes problems appearing during exploitation. Technical solutions according to complexity of realization have been described. It gives an overview of minimum range of modification with utilization of the existing oil system and maximum range by adding separate high pressure oil system with new solutions for performing segments. (Author)

  8. Renewable energy and sustainable communities: Alaska's wind generator experience†

    Science.gov (United States)

    Konkel, R. Steven

    2013-01-01

    Background In 1984, the Alaska Department of Commerce and Economic Development (DCED) issued the State's first inventory/economic assessment of wind generators, documenting installed wind generator capacity and the economics of replacing diesel-fuel-generated electricity. Alaska's wind generation capacity had grown from hundreds of installed kilowatts to over 15.3 megawatts (MW) by January 2012. Method This article reviews data and conclusions presented in “Alaska's Wind Energy Systems; Inventory and Economic Assessment” (1). (Alaska Department of Commerce and Economic Development, S. Konkel, 1984). It provides a foundation and baseline for understanding the development of this renewable energy source. Results Today's technologies have evolved at an astonishing pace; a typical generator in an Alaska wind farm now is likely rated at 1.5-MW capacity, compared to the single-kilowatt (kW) machines present in 1984. Installed capacity has mushroomed, illustrated by Unalakleet's 600-kW wind farm dwarfing the original three 10-kW machines included in the 1984 inventory. Kodiak Electric had three 1.5-MW turbines installed at Pillar Mountain in 2009, with three additional turbines of 4.5-MW capacity installed in 2012. Utilities now actively plan for wind generation and compete for state funding. Discussion State of Alaska energy policy provides the context for energy project decision-making. Substantial renewable energy fund (REF) awards – $202,000,000 to date for 227 REF projects in the first 5 cycles of funding – along with numerous energy conservation programs – are now in place. Increasing investment in wind is driven by multiple factors. Stakeholders have interests both in public policy and meeting private investment objectives. Wind generator investors should consider project economics and potential impacts of energy decisions on human health. Specifically this article considers:changing environmental conditions in remote Alaska villages,impacts associated

  9. Renewable energy and sustainable communities: Alaska's wind generator experience†

    Directory of Open Access Journals (Sweden)

    R. Steven Konkel

    2013-08-01

    Full Text Available Background . In 1984, the Alaska Department of Commerce and Economic Development (DCED issued the State's first inventory/economic assessment of wind generators, documenting installed wind generator capacity and the economics of replacing diesel-fuel-generated electricity. Alaska's wind generation capacity had grown from hundreds of installed kilowatts to over 15.3 megawatts (MW by January 2012. Method . This article reviews data and conclusions presented in “Alaska's Wind Energy Systems; Inventory and Economic Assessment” (1. (Alaska Department of Commerce and Economic Development, S. Konkel, 1984. It provides a foundation and baseline for understanding the development of this renewable energy source. Results . Today's technologies have evolved at an astonishing pace; a typical generator in an Alaska wind farm now is likely rated at 1.5-MW capacity, compared to the single-kilowatt (kW machines present in 1984. Installed capacity has mushroomed, illustrated by Unalakleet's 600-kW wind farm dwarfing the original three 10-kW machines included in the 1984 inventory. Kodiak Electric had three 1.5-MW turbines installed at Pillar Mountain in 2009, with three additional turbines of 4.5-MW capacity installed in 2012. Utilities now actively plan for wind generation and compete for state funding. Discussion . State of Alaska energy policy provides the context for energy project decision-making. Substantial renewable energy fund (REF awards – $202,000,000 to date for 227 REF projects in the first 5 cycles of funding – along with numerous energy conservation programs – are now in place. Increasing investment in wind is driven by multiple factors. Stakeholders have interests both in public policy and meeting private investment objectives. Wind generator investors should consider project economics and potential impacts of energy decisions on human health. Specifically this article considers: a. changing environmental conditions in remote Alaska

  10. Initiation process of the Mw 6.2 central Tottori, Japan, earthquake on October 21, 2016: Stress transfer due to its largest foreshock of Mw 4.1

    Science.gov (United States)

    Noda, S.; Ellsworth, W. L.

    2017-12-01

    On October 21, 2016, a strike-slip earthquake with Mw 6.2 occurred in the central Tottori prefecture, Japan. It was preceded by a foreshock sequence that began with a Mw 4.1 event, the largest earthquake for the sequence, and lasted about two hours. According to the JMA catalog, the largest foreshock had a similar focal mechanism as the mainshock and was located in the immediate vicinity of the mainshock hypocenter. The goal of this study is to understand the relationship between the foreshock and the initial rupture of the mainshock. We first determine the relative hypocenter distance between the foreshock and mainshock using the P-wave onsets on Hi-net station records. The initiation points of the two events are likely about 100 m apart according to the current results, but could be closer. Within the location uncertainty, they might either be coplanar or on subparallel planes. Next, we obtain the slip-history models from a kinematic inversion method using empirical Green's functions derived from other foreshocks with M 2.2 - 2.4. The Mw 4.1 foreshock and Mw 6.2 mainshock started in a similar way until approximately 0.2 s after their onsets. For the foreshock, the rapid growth stage completed by 0.2 s even though the rupture propagation continued for 0.4 - 0.5 s longer (note that 0.2 s is significantly shorter than the typical source duration of a Mw 4.1 earthquake). On the other hand, the mainshock rupture continued to grow rapidly after 0.2 s. The comparison between the relative hypocenter locations and the slip models shows that the mainshock nucleated within the area strongly effected by both static and dynamic stress changes created by the foreshock. We also find that the mainshock initially propagated away from the foreshock hypocenter. We consider that the stress transfer process is a key to understand the mainshock nucleation as well as its rupture growth process.

  11. Sequence Control System of 1-MW CW Klystron for the PEFP

    CERN Document Server

    Park, Byoung R; Chun Myung Hwan; Han Yeung Jin; Hyo Jeong Maeng; Kim Sung Chul; Yang Jae Seok; Yu In Ha

    2005-01-01

    Sequence control system of 1-MW CW klystron for the PEFP (Proton Engineering Frontier Project) has been developed in order to drive the 1-MW klystron amplifier. The system is able to control several power supplies and many environment conditions. The hardware of sequence control and the interlock system are based on the Allen-Bradley's SLC500 Program Logic Controller (PLC). Also the system can be controlled by a touch screen at local mode or Ethernet network with high level HMI at remote mode.

  12. Dynamics of 'abc' and 'qd' constant parameters induction generator model

    DEFF Research Database (Denmark)

    Fajardo-R, L.A.; Medina, A.; Iov, F.

    2009-01-01

    In this paper, parametric sensibility effects on dynamics of the induction generator in the presence of local perturbations are investigated. The study is conducted in a 3x2 MW wind park dealing with abc, qd0 and qd reduced order, induction generator model respectively, and with fluxes as state...

  13. 1170-MW(t) HTGR-PS/C plant application-study report: alumina-plant application

    International Nuclear Information System (INIS)

    Rao, R.; McMain, A.T. Jr.; Stanley, J.D.

    1981-05-01

    This report considers the HTGR-PS/C application to producing alumina from bauxite. For the size alumina plant considered, the 1170-MW(t) HTGR-PS/C supplies 100% of the process steam and electrical power requirements and produces surplus electrical power and/or process steam, which can be used for other process users or electrical power production. Presently, the bauxite ore is reduced to alumina in plants geographically separated from the electrolysis plant. The electrolysis plants are located near economical electric power sources. However, with the integration of an 1170-MW(t) HTGR-PS/C unit in a commercial alumina plant, the excess electric power available [approx. 233 MW(e)] could be used for alumina electrolysis

  14. Utilization of biogas released from palm oil mill effluent for power generation using self-preheated reactor

    International Nuclear Information System (INIS)

    Hosseini, Seyed Ehsan; Wahid, Mazlan Abdul

    2015-01-01

    Highlights: • A lab-scale reactor called self-preheating flameless combustion (SPFC) system is experimented. • Feasibility of power generation by POME biogas is modeled using SPFC system. • 4 MW power is available by POME biogas utilization in a typical palm oil mill with 300,000 tons production. • The rate of power generation increases when 2% hydrogen is added to POME biogas ingredients. - Abstract: In palm oil mills, for one ton crude palm oil (CPO) production, 70 m"3 biogas is released from palm oil mill effluent (POME) which can endanger the environment. Palm oil mills without appropriate strategies for biogas collection can participate in greenhouse gases (GHGs) generation actively. In this paper, a typical palm oil mill with annual capacity of 300,000 ton oil palm production and 3 MW electricity demand is considered as a pilot plant and feasibility of power generation by POME biogas is modeled by Aspen Plus considering flameless mode in combustion system. A new design of lab-scale flameless reactor called self-preheated flameless combustion (SPFC) system is presented and employed in power generation modeling. In SPFC system, the flameless chamber is employed as a heater to preheat an oxidizer over the self-ignition temperature of the fuel. A helical stainless steel pipe (called self-preheating pipe) is installed inside the chamber to conduct the oxidizer from exhaust zone to the combustion zone inside the chamber and preheat oxidizer. In the flameless mode, the diluted oxidizer is injected to the helical pipe from the exhaust zone and the preheated oxidizer at the burner is conducted to the flameless furnace through a distributor. In SPFC system external heater for preheating oxidizer is removed and the rate of power generation increases. The results show that 10.8 MW power could be generated in ultra-lean POME biogas SPFC. However, the rate of pollutant especially CO_2 and NO_x is high in this circumstances. In stoichiometric condition, 4 MW power

  15. A multiloop geothermal energy supply system for the town of Denizli; Ein aus verschiedenen Kreislaeufen zusammengesetztes, geothermisches Energiesystem fuer die Stadt Denizli

    Energy Technology Data Exchange (ETDEWEB)

    Kilkis, B I [GEOENERGY for State of Art Geothermal Technologies, Springfield, MO (United States)

    1997-12-01

    Denizli is a town of 400,000 inhabitants. At Kizildere, 31 km from the city center, a geothermal system with a rated capacity of 17 MW{sub e} and a real capacity of 10 MW{sub e} was commissioned in 1994. The wellhead temperature is 212 C and the production rate 830 t/h. The brine, with a temperature of 145 C, is discharged into a nearby river without making use of the available thermal energy of 110 MW{sub t} (375 MBtu/h). In 1994, Pamukkale University held a symposium at Denizli in order to investigate the feasibility of heat recovery for district heating and cooling and the available technologies. (orig.) [Deutsch] Denizli hat fast 400 000 Einwohner. In Kizildere, 31 km vom Stadtzentrum, ist seit 1984 eine geothermische Produktionsanlage mit einer Sollleistung von 17 MW{sub e} in Betrieb. Die tatsaechliche Leistung liegt bei 10 MW{sub e}. Die Temperatur an der Quelle betraegt 212 C und die Produktionsrate 830 t/h. Der in Betrieb befindliche Separator liefert 80 t/h Dampf. Die verbleibende Sole wird derzeit mit einer Temperatur von etwa 145 C in einen nahegelegenen Fluss abgeleitet, ohne die verfuegbare geothermische Energie von 110 MW{sub t} (375 MBtu/h) zu nutzen. 1994 wurde von der Pamukkale Universitaet in Denizli ein Symposium veranstaltet, um die Zweckmaessigkeit und die verschiedenen Moeglichkeiten der Abwaermerueckgewinnung durch ein Fernwaerme- und Kuehlungssystem in Denizli zu eroertern. (orig.)

  16. FY 1998 Report on development of large-scale wind power generation systems. Part 2. Operational research on large-scale wind power generation systems; 1998 nendo ogata furyoku hatsuden system kaihatsu seika hokokusho. 2. Ogata furyoku hatsuden system no unten kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The on-the-spot surveys are conducted and related information is collected for current status of wind power generators connected to power grid systems and simulation techniques therefor in the USA and European countries. In Denmark, the grid system to which wind power generators are connected is a 10kV radiation type system, by which these generators are connected to general consumers. Power quality is investigated by the programs developed by DEFU (Danske Elvarkers Forening Udredning). The German's Norderland Wind Park has the largest capacity in Europe with 35 units of 1.5MW generators. They are connected to a 110kV grind system via ISOREE to control disturbances to the commercial grid system. The USA, used to have the world largest wind power generation capacity, is now plays second fiddle to Germany whose capacity has now exceeded 2,000MW. The country is now seeing the second rush for construction of wind power generators, planning to have a new capacity of 570MW in 1998. Information is also collected from other countries or organizations, including the Netherlands, WREC, Italy and Spain. (NEDO)

  17. FY 1998 Report on development of large-scale wind power generation systems. Part 2. Operational research on large-scale wind power generation systems; 1998 nendo ogata furyoku hatsuden system kaihatsu seika hokokusho. 2. Ogata furyoku hatsuden system no unten kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The on-the-spot surveys are conducted and related information is collected for current status of wind power generators connected to power grid systems and simulation techniques therefor in the USA and European countries. In Denmark, the grid system to which wind power generators are connected is a 10kV radiation type system, by which these generators are connected to general consumers. Power quality is investigated by the programs developed by DEFU (Danske Elvarkers Forening Udredning). The German's Norderland Wind Park has the largest capacity in Europe with 35 units of 1.5MW generators. They are connected to a 110kV grind system via ISOREE to control disturbances to the commercial grid system. The USA, used to have the world largest wind power generation capacity, is now plays second fiddle to Germany whose capacity has now exceeded 2,000MW. The country is now seeing the second rush for construction of wind power generators, planning to have a new capacity of 570MW in 1998. Information is also collected from other countries or organizations, including the Netherlands, WREC, Italy and Spain. (NEDO)

  18. Trading our health: Ontario Power Generation's plan to violate its air pollution reduction commitment

    International Nuclear Information System (INIS)

    Gibbons, J.; Bjorkquist, S.

    1999-01-01

    Amid growing concerns about nitrogen oxide (Nox) emissions, the Ontario Clean Air Alliance is recommending in this report that the Ontario government restrict Nox emissions from Ontario Power Generation (OPG) in the year 2000 and not let the corporation meet its emissions cap by on a net basis by retiring Pilot Emission Reduction Trading (PERT) Nox emission reduction credits. Instead the alliance believes the Ontario government should require OPG to achieve emissions compliance by curtailing coal-fired electricity exports, purchasing renewable and natural-gas electricity and promoting energy efficiency. OPG's inventory of PERT Nox reduction credits are assessed against whether they will cause an increase in the year 2000 as a result of trading. Ontario Power Generation's Nox emissions are a central chemical component of acid rain and smog and are produced from its coal-fired electricity generators. The utility would like to achieve Nox reductions by establishing demand management programs which would reduce the demand for electricity by 5200 megawatts (MW), by purchasing 3100 MW of non-utility generation and by undertaking combustion process modifications at its Lambton and Nanticoke coal-fired generating stations. It has not met its 2000 demand management and non-utility generation targets, and specifically, as of December 31, 1998, Ontario Hydro's successor companies demand management programs have only reduced electricity demand by approximately 1300 MW. Furthermore, the successor companies will have only approximately 1700 MW of non-utility generation capacity under contract by December 31, 1999. The report describes the criteria for ensuring that Nox emissions trading will not lead to a net increase in Ontario's emissions in any given year, and a description is included of why the 'Draft Rules for Emission Trading in Ontario' rules do not meet these criteria. Permitting OPG to use its PERT credits to meet its Nox cap, will allow them to increase coal

  19. The isolated 678-km deep 30 May 2015 MW 7.9 Ogasawara (Bonin) Islands earthquake

    Science.gov (United States)

    Ye, L.; Lay, T.; Zhan, Z.; Kanamori, H.; Hao, J.

    2015-12-01

    Deep-focus earthquakes, located 300 to 700 km below the Earth's surface within sinking slabs of relatively cold oceanic lithosphere, are mysterious phenomena. Seismic radiation from deep events is essentially indistinguishable from that for shallow stick-slip frictional-sliding earthquakes, but the confining pressure and temperature are so high for deep-focus events that a distinct process is likely needed to account for their abrupt energy release. The largest recorded deep-focus earthquake (MW 7.9) in the Izu-Bonin slab struck on 30 May 2015 beneath the Ogasawara (Bonin) Islands, isolated from prior seismicity by over 100 km in depth, and followed by only 2 small aftershocks. Globally, this is the deepest (678 km) major (MW > 7) earthquake in the seismological record. Seismicity indicates along-strike contortion of the Izu-Bonin slab, with horizontal flattening near a depth of 550 km in the Izu region and progressive steepening to near-vertical toward the south above the location of the 2015 event. Analyses of a large global data set of P, SH and pP seismic phases using short-period back-projection, subevent directivity, and broadband finite-fault inversion indicate that the mainshock ruptured a shallowly-dipping fault plane with patchy slip that spread over a distance of ~40 km with variable expansion rate (~5 km/s down-dip initially, ~3 km/s up-dip later). During the 17 s rupture duration the radiated energy was ~3.3 x 1016 J and the stress drop was ~38 MPa. The radiation efficiency is moderate (0.34), intermediate to that of the 1994 Bolivia and 2013 Sea of Okhotsk MW 8.3 earthquakes, indicating a continuum of processes. The isolated occurrence of the event suggests that localized stress concentration associated with the pronounced deformation of the Izu-Bonin slab likely played a role in generating this major earthquake.

  20. Beginning-of-life neutronic analysis of a 3000-MW(t) HTGR

    International Nuclear Information System (INIS)

    Vigil, J.C.

    1975-12-01

    The results of a study of safety-related neutronic characteristics for the beginning-of-life core of a 3000-MW(t) High-Temperature Gas-Cooled Reactor are presented. Emphasis was placed on the temperature-dependent reactivity effects of fuel, moderator, control poisons, and fission products. Other neutronic characteristics studied were gross and local power distributions, neutron kinetics parameters, control rod and other material worths and worth distributions, and the reactivity worth of a selected hypothetical perturbation in the core configuration. The study was performed for the most part using discrete-ordinates transport theory codes and neutron cross sections that were interpolated from a four-parameter nine-group library supplied by the HTGR vendor. A few comparison calculations were also performed using nine-group data generated with an independent cross-section processing code system. Results from the study generally agree well with results reported by the HTGR vendor

  1. Optimization of deterministic based design of the PWR 1000 MW by aid of PSA

    International Nuclear Information System (INIS)

    Feigel, A.; Fabian, H.

    1987-01-01

    PSA was used to optimize the determinstic based design of the PWR 1000 MW. For this three reference accidents which are known to be the covering ones from previous valuations were investigated in detail. On basis of these accidents the integral core damage frequency has been estimated to be about 2 E-5/a. This result reflects a sufficient safety level and thus the quality of the requirement which has to be used for the design. Nevertheless the influence of some plant modifications was estimated in addition. It shows that especially the consideration of a modul with a diverse power generator results in a more balanced design on an increased safety level. (orig.)

  2. Neutronic performance of a benchmark 1-MW LPSS

    International Nuclear Information System (INIS)

    Russell, G.J.; Pitcher, E.J.; Ferguson, P.D.

    1995-01-01

    We used split-target/flux-trap-moderator geometry in our 1-MW LPSS computational benchmark performance calculations because the simulation models were readily available. Also, this target/moderator arrangement is a proven LANSCE design and a good neutronic performer. The model has four moderator viewed surfaces, each with a 13x13 cm field-of-view. For our scoping neutronic-performance calculations, we attempted to get as much engineering realism into the target-system mockup as possible. In our present model, we account for target/reflector dilution by cooling; the D 2 O coolant fractions are adequate for 1 MW of 800-MeV protons (1.25 mA). We have incorporated a proton beam entry window and target canisters into the model, as well as (partial) moderator and vacuum canisters. The model does not account for target and moderator cooling lines and baffles, entire moderator canisters, and structural material in the reflector

  3. Treatment of carbon fiber brush anodes for improving power generation in air–cathode microbial fuel cells

    KAUST Repository

    Feng, Yujie

    2010-04-02

    Carbon brush electrodes have been used to provide high surface areas for bacterial growth and high power densities in microbial fuel cells (MFCs). A high-temperature ammonia gas treatment has been used to enhance power generation, but less energy-intensive methods are needed for treating these electrodes in practice. Three different treatment methods are examined here for enhancing power generation of carbon fiber brushes: acid soaking (CF-A), heating (CF-H), and a combination of both processes (CF-AH). The combined heat and acid treatment improve power production to 1370 mW m-2, which is 34% larger than the untreated control (CF-C, 1020 mW m-2). This power density is 25% higher than using only acid treatment (1100 mW m-2) and 7% higher than that using only heat treatment (1280 mW m-2). XPS analysis of the treated and untreated anode materials indicates that power increases are related to higher N1s/C1s ratios and a lower C-O composition. These findings demonstrate efficient and simple methods for improving power generation using graphite fiber brushes, and provide insight into reasons for improving performance that may help to further increase power through other graphite fiber modifications. © 2009 Elsevier B.V. All rights reserved.

  4. Generation Adequacy Report on the electricity supply-demand balance in France - 2005 Edition

    International Nuclear Information System (INIS)

    2006-01-01

    Under the terms of the Law of 10 February 2000, RTE is required to draw up a multi-annual Generation Adequacy Report on the electricity supply-demand balance in France. The present 2005 edition has been compiled in close conjunction with the working group in charge of long-term power generation pluri-annual investment programs at the French Directorate for Energy Demand and Markets, DIDEME. The purpose of RTE's Generation Adequacy Report is to quantify the additional electric generating facilities that need to be commissioned in the years ahead. It is based on various scenarios for the development of supply and demand, adopted on January 1, 2005, and covers the period 2006-2016. Three different consumption forecast scenarios have been used. All include a substantial drop in consumption by the Eurodif plant between 2010 and 2015. The two upper scenarios (called R1 and R2) fall within current trends, with annual growth of 1.7% and 1.5% until 2010 and a slowing down thereafter; they can be considered as equally likely to occur in the short-term. The low consumption growth scenario (R3) is intended to depict a context of environmental commitments. It is based on the assumption that demand side management initiatives will have an immediate impact, which makes it rather unlikely in the short-term. Under the reference scenario (R2), French domestic consumption, which was 468.5 TWh in 2004, reaches 508 TWh by 2010 and 552 TWh by 2020. Consumption at peak time in winter increases by around 1,000 MW per year. Up until 2016, France's fleet of generating facilities will be determined by a number of changes: the recommissioning of three of EDF's fuel-oil-fired units, the expected arrival of the EPR in 2012, and the definitive shutdown by 2015 of coal-fired plants that do not meet the requirements imposed by environmental regulations. In the field of renewable energy sources (RES), three different scenarios are considered. The main difference between them is the

  5. ZTEK`s ultra-high efficiency fuel cell/gas turbine system for distributed generation

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, M.; Nathanson, D. [Ztek Corp., Waltham, MA (United States); Bradshaw, D.T. [Tennessee Valley Authority, Chattanooga, TN (United States)] [and others

    1996-12-31

    Ztek`s Planar Solid Oxide Fuel Cell (SOFC) system has exceptional potential for utility electric power generation because of: simplicity of components construction, capability for low cost manufacturing, efficient recovery of very high quality by-product heat (up to 1000{degrees}C), and system integration simplicity. Utility applications of the Solid Oxide Fuel Cell are varied and include distributed generation units (sub-MW to 30MW capacity), repowering existing power plants (i.e. 30MW to 100MW), and multi-megawatt central power plants. A TVA/EPRI collaboration program involved functional testing of the advanced solid oxide fuel cell stacks and design scale-up for distributed power generation applications. The emphasis is on the engineering design of the utility modules which will be the building blocks for up to megawatt scale power plants. The program has two distinctive subprograms: Verification test on a 1 kW stack and 25kW module for utility demonstration. A 1 kW Planar SOFC stack was successfully operated for 15,000 hours as of December, 1995. Ztek began work on a 25kW SOFC Power System for TVA, which plans to install the 25kW SOFC at a host site for demonstration in 1997. The 25kW module is Ztek`s intended building block for the commercial use of the Planar SOFC. Systems of up to megawatt capacity can be obtained by packaging the modules in 2-dimensional or 3-dimensional arrays.

  6. Development of a field pole of 1 MW-class HTS motor

    International Nuclear Information System (INIS)

    Yuan, S; Kimura, Y; Miki, M; Felder, B; Tsuzuki, K; Izumi, M; Ida, T; Umemoto, K; Aizawa, K; Yokoyama, M

    2010-01-01

    We report a field-pole high-temperature superconductor (HTS) magnet designed for 1 MW-class motor for propulsion. The field pole is assembled to the rotor of the radial-type motor. Each field pole is composed of HTS-Bi2223 tape wound into coils which have been piled up as a double pancake coils. In the design concept of the motor, we employ field poles without iron core. We prepared the test field-pole coil, whose dimension is smaller than the designed one for 1 MW, and tested its performances after cooling under self-field and external magnetic field. We verified the operation with the minimum bend radius of the coils required in the motor design, while keeping an optimal current which is lower than the critical current of the field-pole coil. The test HTS field poles were successfully cooled down and operated under a magnetic field ranging up to 5 T. We report the results of the test field-pole coil and the manufacture of a practical racetrack coil with Bi2223 and discuss the adaptability to 1 MW-class motors.

  7. Development of a field pole of 1 MW-class HTS motor

    Science.gov (United States)

    Yuan, S.; Kimura, Y.; Miki, M.; Felder, B.; Tsuzuki, K.; Ida, T.; Izumi, M.; Umemoto, K.; Aizawa, K.; Yokoyama, M.

    2010-06-01

    We report a field-pole high-temperature superconductor (HTS) magnet designed for 1 MW-class motor for propulsion. The field pole is assembled to the rotor of the radial-type motor. Each field pole is composed of HTS-Bi2223 tape wound into coils which have been piled up as a double pancake coils. In the design concept of the motor, we employ field poles without iron core. We prepared the test field-pole coil, whose dimension is smaller than the designed one for 1 MW, and tested its performances after cooling under self-field and external magnetic field. We verified the operation with the minimum bend radius of the coils required in the motor design, while keeping an optimal current which is lower than the critical current of the field-pole coil. The test HTS field poles were successfully cooled down and operated under a magnetic field ranging up to 5 T. We report the results of the test field-pole coil and the manufacture of a practical racetrack coil with Bi2223 and discuss the adaptability to 1 MW-class motors.

  8. 10 MW, L-Band Klystron for Accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Read, Michael [Calabazas Creek Research, Inc., San Mateo, CA (United States); Ives, Robert L. [Calabazas Creek Research, Inc., San Mateo, CA (United States); Ferguson, Patrick [Calabazas Creek Research, Inc., San Mateo, CA (United States)

    2016-03-07

    This program developed a 10 MW, pulsed, Annular Beam Klystron (ABK) for accelerator applications. This is an alternative RF source to multiple beam klystrons MBKs), which are more complex and considerably more expensive. The ABK uses a single, annular cathode and a single beam tunnel with fundamental mode cavities. The operating specifications (voltage, efficiency, power, bndwidth, duty, etc.) are the same as for comparable MBKs.

  9. Characterizing and configuring motorized wedge for a new generation telecobalt machine in a treatment planning system

    Directory of Open Access Journals (Sweden)

    Kinhikar Rajesh

    2007-01-01

    Full Text Available A new generation telecobalt unit, Theratron Equinox-80, (MDS Nordion, Canada has been evaluated. It is equipped with a single 60-degree motorized wedge (MW, four universal wedges (UW for 150, 300, 450 and 600. MW was configured in Eclipse (Varian, Palo Alto, USA 3D treatment planning system (TPS. The profiles and central axis depth doses (CADD were measured with radiation field analyzer blue water phantom for MW. These profiles and CADD for MW were compared with UW in a homogeneous phantom generated in Eclipse for various field sizes. The absolute dose was measured for a field size of 10 x 10 cm2 only in a MEDTEC water phantom at 10 cm depth with a 0.13 cc thimble ion chamber (Scanditronix Wellhofer, Uppsala, Sweden and a NE electrometer (Nuclear Enterprises, UK. Measured dose with ion chamber was compared with the TPS predicted dose. MW angle was verified on the Equinox for four angles (15o, 30o, 45o and 60o. The variation in measured and calculated dose at 10 cm depth was within 2%. The measured and the calculated wedge angles were in well agreement within 2o. The motorized wedges were successfully configured in Eclipse for four wedge angles.

  10. Steam generator materials performance in high temperature gas-cooled reactors

    International Nuclear Information System (INIS)

    Chafey, J.E.; Roberts, D.I.

    1980-11-01

    This paper reviews the materials technology aspects of steam generators for HTGRs which feature a graphite-moderated, uranium-thorium, all-ceramic core and utilizes high-pressure helium as the primary coolant. The steam generators are exposed to gas-side temperatures approaching 760 0 C and produce superheated steam at 538 0 C and 16.5 MPa (2400 psi). The prototype Peach Bottom I 40-MW(e) HTGR was operated for 1349 EFPD over 7 years. Examination after decommissioning of the U-tube steam generators and other components showed the steam generators to be in very satisfactory condition. The 330-MW(e) Fort St. Vrain HTGR, now in the final stages of startup, has achieved 70% power and generated more than 1.5 x 10 6 MWh of electricity. The steam generators in this reactor are once-through units of helical configuration, requiring a number of new materials factors including creep-fatigue and water chemistry control. Current designs of larger HTGRs also feature steam generators of helical once-through design. Materials issues that are important in these designs include detailed consideration of time-dependent behavior of both base metals and welds, as required by current American Society of Mechanical Engineers (ASME) Code rules, evaluation of bimetallic weld behavior, evaluation of the properties of large forgings, etc

  11. Race-track coils for a 3 MW HTS ship motor

    Energy Technology Data Exchange (ETDEWEB)

    Ueno, E., E-mail: ueno-eisaku@sei.co.jp; Kato, T.; Hayashi, K.

    2014-09-15

    Highlights: • Sumitomo Electric manufactured the HTS field coils for a 3 MW HTS ship motor. • The motor was developed and successfully passed the loading test by Kawasaki Heavy. • We tested and obtained the basic data to evaluate the 20-year durability of coils. - Abstract: Since the discovery of high-temperature superconductivity (HTS), Sumitomo Electric has been developing silver-sheathed Bi2223 superconducting wire and products. Ship propulsion motors are one of the most promising applications of HTS. Sumitomo Electric Industries, Ltd. (SEI) has recently manufactured 24 large racetrack coils, using 70 km long DI-BSCCO wires, for use in a 3 MW HTS motor developed by Kawasaki Heavy Industries, Ltd. (KHI). The 3 MW HTS motor, using our newly developed racetrack coils, has successfully passed the loading test. It is particularly important that the HTS field coils used in ship propulsion motors can withstand the expansive forces repeatedly applied to them. As racetrack type coils have straight sections, the support mechanism they require to withstand expansive forces is very different from that of circular coils. Therefore, we ran tests and obtained the basic data to evaluate the 20-year durability of racetrack coils against the repeatedly applied expansive forces expected in domestic ship propulsion motors.

  12. Grid Compatibility of Variable Speed Wind Turbines with Directly Coupled Synchronous Generator and Hydro-Dynamically Controlled Gearbox

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, H.; Poeller, M. [DIgSILENT GmbH, 72810 Gomaringen (Germany); Basteck, A.; Tilscher, M.; Pfister, J. [Voith Turbo GmbH and Co. KG, 74564 Crailsheim (Germany)

    2006-07-01

    This paper analyzes grid integration aspects of a new type of variable-speed wind turbine, the directly coupled synchronous generator with hydro-dynamically controlled gearbox. In contrast to existing wind generators using synchronous generators, the generator of this concept is directly connected to the AC grid, without the application of any power electronics converter. Variable speed operation of the turbine is mechanically achieved by a gear box with continuously controllable variable gear box ratio. For this purpose, a detailed dynamic model of a 2 MW wind turbine with a Voith WinDrive has been implemented using the modelling environment of the simulation software DIgSILENT PowerFactory. For investigating grid compatibility aspects of this new wind generator concept, a model of a 50 MW wind farm, with typical layout, based on 25 wind turbines of the 2 MW-class has been analyzed. This paper focuses on the compatibility of the new concept with existing connection standards, such as the E.ON grid code. Of special interest are typical stability phenomena of synchronous generators, such as transient and oscillatory stability as well as power quality issues like voltage flicker. The results of stability studies are presented and possible advantages of the new concept with special focus on offshore applications are discussed.

  13. Operation and maintenance of 1MW PUSPATI TRIGA reactor

    International Nuclear Information System (INIS)

    Adnan Bokhari; Mohammad Suhaimi Kassim

    2006-01-01

    The Malaysian Research Reactor, Reactor TRIGA PUSPATI (RTP) has been successfully operated for 22 years for various experiments. Since its commissioning in June 1982 until December 2004, the 1MW pool-type reactor has accumulated more than 21143 hours of operation, corresponding to cumulative thermal energy release of about 14083 MW-hours. The reactor is currently in operation and normally operates on demand, which is normally up to 6 hours a day. Presently the reactor core is made up of standard TRIAGA fuel element consists of 8.5 wt%, 12 wt% and 20 wt% types; 20%-enriched and stainless steel clad. Several measures such as routine preventive maintenance and improving the reactor support systems have been taken toward achieving this long successful operation. Besides normal routine utilization like other TRIGA reactors, new strategies are implemented for effective increase in utilization. (author)

  14. The jet 10-MW lower hybrid current drive system

    International Nuclear Information System (INIS)

    Gormezano, C.; Bosia, G.; Brinkschulte, H.; David, C.; Dobbing, J.A.; Kaye, A.S.; Jacquinot, J.; Lloyd, B.; Knowlton, S.; Moreau, D.

    1987-01-01

    A Lower Hybrid system to control the plasma current profile is being prepared so that a higher central electron temperature can be obtained. The proposed system is designed to launch 10 MW of power at f = 3.7 GHz through a single port in JET, producing between 1 and 2 MA of RF driven current at an average density of 5 x 10 19 m -3 . Current drive efficiency is maximized by using a low value of the parallel wave number spectrum (N// - 1.3 - 2.3). The final launcher will be made of 48 multijunctions fed by 24 klystrons with the proper phasing. Dynamic matching of the launcher will be optimized by moving the launcher in real time during the pulse. A first stage (2 MW) is presently under construction. The full system is being designed to be in operation in 1990

  15. A review on earthquake and tsunami hazards of the Sumatran plate boundary: Observing expected and unexpected events after the Aceh-Andaman Mw 9.15 event

    Science.gov (United States)

    Natawidjaja, D.

    2013-12-01

    The 600-km Mentawai megathrust had produced two giant historical earthquakes generating big tsunamies in 1797 and 1833. The SuGAr (Sumatran GPS continuous Array) network, first deployed in 2002, shows that the subduction interface underlying Mentawai Islands and the neighboring Nias section in the north are fully locked, thus confirming their potential hazards. Outreach activities to warn people about earthquake and tsunamies had been started since 4 months prior to the 26 December 2004 in Aceh-Andaman earthquake (Mw 9.15). Later in March 2005, the expected megathrust earthquake (Mw 8.7) hit Nias-Simelue area and killed about 2000 people, releasing the accumulated strain since the previous 1861 event (~Mw 8.5). After then many Mw 7s and smaller events occured in Sumatra, filling areas between and around two giant ruptures and heighten seismicities in neighboring areas. In March 2007, the twin earthquake disaster (Mw 6.3 and Mw 6.4) broke two consecutive segments of the transcurrent Sumatran fault in the Singkarak lake area. Only six month later, in September 2007, the rapid-fire-failures of three consecutive megathrust patches (Mw 8.5, Mw 7.9 and Mw 7.0) ruptured a 250-km-section of the southern part of the Mentawai. It was a big surprise since this particular section is predicted as a very-low coupled section from modelling the SuGAr data, and hence, bypassing the more potential fully coupled section of the Mentawai in between the 2005 and 2007 ruptures. In September 2009, a rare unexpected event (Mw 7.6) suddenly ruptured an intracrustal fault in the subducted slab down under Padang City and killed about 500 people. Padang had been in preparation for the next tsunami but not for strong shakes from near by major earthquake. This event seems to have remotely triggered another Mw 6.7 on the Sumatran fault near kerinci Lake, a few hundred kilometers south of Padang, in less than a day. Just a year later, in November 2010, again an unexpected large slow-slip event of

  16. 34 GHz, 45 MW pulsed magnicon

    International Nuclear Information System (INIS)

    Nezhevenko, Oleg A.; LaPointe, Michael A.; Yakovlev, Vyacheslav P.; Hirshfield, Jay L.; Serdobintsev, Gennady V.; Kuznetsov, Gennady I.; Persov, Boris Z.; Fix, Alexander

    2002-01-01

    A high efficiency, high power magnicon at 34.272 GHz has been designed and built as a microwave source to develop RF technology for a future multi-TeV electron-positron linear collider. The tube is designed to provide a peak output power of ∼45 MW in a 1 microsecond pulse, with a gain of 55 dB, using a 500 kV, 220 A, 1 mm-diameter electron beam. The status of the tube itself as well as the near-term experimental program is presented

  17. Small turbogenerators for post power generation of non-utilized thermal energy; Kleine Turbogeneratoren zur Nachverstromung nicht genutzter Waermen

    Energy Technology Data Exchange (ETDEWEB)

    Krause, Kristian; Redemann, Christian [LEViTEC GmbH, Lahnau (Germany); Priebe, Klaus-Peter [LTi ADATURB GmbH, Unna (Germany)

    2009-07-01

    Nowadays in Germany a huge offer of waste heat is available, which is not used adequately for the generation of effective energy like electricity and coldness. This kind of heat is available through cogeneration units, combined heat and power stations, heat plants and process heat generation, operated by fossil or renewable energies. This unused waste heat achieves several 10.000 MW of thermal output, which accumulate in small installations with an output up to 1,0 MW primary energy insert. (orig.)

  18. Layered Multi-mode Optimal Control Strategy for Multi-MW Wind Turbine

    Institute of Scientific and Technical Information of China (English)

    KONG Yi-gang; WANG Zhi-xin

    2008-01-01

    The control strategy is one of the most important renewable technology, and an increasing number of multi-MW wind turbines are being developed with a variable speed-variable pitch (VS-VP) technology. The main objective of adopting a VS-VP technology is to improve the fast response speed and capture maximum energy. But the power generated by wind turbine changes rapidly because of the centinuous fluctuation of wind speed and direction. At the same time, wind energy conversion systems are of high order, time delays and strong nonlinear characteristics because of many uncertain factors. Based on analyzing the all dynamic processes of wind turbine, a kind of layered multi-mode optimal control strategy is presented which is that three control strategies: bang-bang, fuzzy and adaptive proportienai integral derivative (PID) are adopted according to different stages and expected performance of wind turbine to capture optimum wind power, compensate the nonlinearity and improve the wind turbine performance at low, rated and high wind speed.

  19. Design of a tunable 4-MW Free Electron Maser for heating fusion plasmas

    International Nuclear Information System (INIS)

    Caplan, M.; Kamin, G.; Shang, C.C.; Lindquist, W.

    1993-09-01

    There is an ongoing program at the FOM institute, The Netherlands, to develop a 1-MW, long-pulse, 200-Ghz Free Electron Maser (FEM) using a DC accelerator system with depressed collector. We present an extrapolation of this design to more than 4MW of output microwave power in order to reduce the cost per kW and increase the power per module in a plasma heating system

  20. Design of a tunable 4-MW free electron maser for heating fusion plasmas

    International Nuclear Information System (INIS)

    Caplan, M.; Kamin, G.; Shang, C.C.; Lindquist, W.

    1993-01-01

    There is an ongoing program at the FOM institute, The Netherlands, to develop a 1 -MW, long-pulse, 200-GHz Free Electron Maser (FEM) using a DC accelerator system with depressed collector. The authors present an extrapolation of this design to more than 4 MW of output microwave power in order to reduce the cost per kW and increase the power per module in a plasma heating system

  1. Effective hydrogenation and surface damage induced by MW-ECR plasma of fine-grained polycrystalline silicon

    Energy Technology Data Exchange (ETDEWEB)

    Madi, D. [Institut d' Electronique du Solide et des Systemes (InESS)-CNRS/UdS, Strasbourg (France); Universite de Jijel, Laboratoire d' Etudes et de Modelisation en Electrotechnique (LAMEL), Faculte des Sciences de l' Ingenieur, Jijel (Algeria); Prathap, P.; Focsa, A.; Slaoui, A. [Institut d' Electronique du Solide et des Systemes (InESS)-CNRS/UdS, Strasbourg (France); Birouk, B. [Universite de Jijel, Laboratoire d' Etudes et de Modelisation en Electrotechnique (LAMEL), Faculte des Sciences de l' Ingenieur, Jijel (Algeria)

    2010-06-15

    This work reports the investigations on the effects of the hydrogenation process of thin film polycrystalline n{sup +}pp{sup +} mesa silicon cells using MW-ECR plasma in a conventional PECVD system. Different operating parameters such as MW-ECR power, annealing temperature and the doping level of the emitter region were varied. The n{sup +}-type emitter regions were obtained by phosphorus diffusion in a conventional furnace using an oxide doping source containing phosphorus (P507 or P509 solutions, from Filmtronics Inc.). The MW hydrogenation was carried out at a sample temperature of 400 C for 60 min. Both types of emitters formed from P507 and P509 showed V{sub oc} of 155 mV and 206 mV, which increased linearly to 305 mV and 331 mV, respectively, after hydrogenation when the MW power varied from 200 to 650 W. However, the sheet resistances of the n{sup +} emitter region showed a slight increase depending upon hydrogenation power because of its etching. In a further study, hydrogenated samples were annealed in neutral or forming gas (FG) and we observed interesting results on V{sub oc} in the presence of FG. The FG annealing temperature study revealed a strong dependence of V{sub oc} on MW power, which affected the etching level of emitter and emitter dopant concentration, which controls the diffusion of hydrogen ions during post-hydrogenation step. The results were explained in detail by combining the effects of MW power and dopant level of the emitter. (orig.)

  2. Physical status of the 10 MW test module

    International Nuclear Information System (INIS)

    Luo Jingyu

    1991-01-01

    Like most graphite moderated HTR systems, the 10 MW Test-Module reactor is undermoderated. This means if the water ingress is into the pebble bed that this system will gain reactivity as moderator is added to the core. The reactivity increase caused by water ingress strongly depends on the geometry of the core, the temperature, the burnup status and especially the moderator to fuel ratio (the metal content per fuel element). For the equilibrium core 5 gram of heavy metal per fuel element is chosen in order to limit the effect of water ingress. Another important effect of water ingress is to reduce the worth of control rods which are usually located in the reflector. The distance between core and control rods in the reflector are carefully calculated. In the 10 MW Test-Module reactor the core shutdown capability of 12 control rods are selected such that any accident reactivity can be counterbalanced and only half of the rods have to be available to render the reactor down from normal operation to the cold, permanent subcritical condition. (author). 5 figs, 3 tabs

  3. Design of 250-MW CW RF system for APT

    International Nuclear Information System (INIS)

    Rees, D.

    1997-01-01

    The design for the RF systems for the APT (Accelerator Production of Tritium) proton linac will be presented. The linac produces a continuous beam power of 130 MW at 1300 MeV with the installed capability to produce up to a 170 MW beam at 1700 MeV. The linac is comprised of a 350 MHz RFQ to 7 MeV followed in sequence by a 700 MHz coupled-cavity drift tube linac, coupled-cavity linac, and superconducting (SC) linac to 1700 MeV. At the 1700 MeV, 100 mA level the linac requires 213 MW of continuous-wave (CW) RF power. This power will be supplied by klystrons with a nominal output power of 1.0 MW. 237 kystrons are required with all but three of these klystrons operating at 700 MHz. The klystron count includes redundancy provisions that will be described which allow the RF systems to meet an operational availability in excess of 95 percent. The approach to achieve this redundancy will be presented for both the normal conducting (NC) and SC accelerators. Because of the large amount of CW RF power required for the APT linac, efficiency is very important to minimize operating cost. Operation and the RF system design, including in-progress advanced technology developments which improve efficiency, will be discussed. RF system performance will also be predicted. Because of the simultaneous pressures to increase RF system reliability, reduce tunnel envelope, and minimize RF system cost, the design of the RF vacuum windows has become an important issue. The power from a klystron will be divided into four equal parts to minimize the stress on the RF vacuum windows. Even with this reduction, the RF power level at the window is at the upper boundary of the power levels employed at other CW accelerator facilities. The design of a 350 MHz, coaxial vacuum window will be presented as well as test results and high power conditioning profiles. The transmission of 950 kW, CW, power through this window has been demonstrated with only minimal high power conditioning

  4. Least cost analysis of Belarus electricity generation system with focus on nuclear option

    International Nuclear Information System (INIS)

    Mikhalevich, A.; Yakushau, A.

    2004-01-01

    A basic feature of the Belarus electricity system is that about 50% of the installed power capacity is used to produce heat for the central heating supply system. The Republic has one of the most developed districts heating system in Europe. The installation started in 1930, and developed very fast after 1945. Co-generation of electricity and thermal energy in central power plants has played a fundamental role in the local economy. Presently, Belarus electricity generation system includes: Total installed capacities of condensing turbines 3665 MW; Total installed capacities of co-generation turbines 3889 MW. It is expected that in 2020 in accordance with electricity demand forecast peak load demand will be equaled approximately 9500 MW. Taking into account that operation time of 60 % existent co-generation turbine and 70 % of condensing turbine can be extended up to 2020 during the period 2005 - 2020 it is necessity to install about 1500 MW of new co-generation units and about 2000 MW of condensing turbines. To select the least cost scenario for electricity generation system expansion improved computer code WASP-IV for Windows had been used. As far code WASP-IV do not allow finding out optimal solution for electricity generation system with high share of co-generation directly the methodology of application of this program for this case had been developed. Methodology is based on utilization of code WASP-IV for simulation condensing turbines and module BALANCE for modeling co-generation part of the system. The scenarios for the electricity system expansion plan included only conventional technologies. Presently, the works connected with the preparedness for NPP construction in the Republic including site survey for NPP are being carried out. The first stage of siting process according to the IAEA classification has been completed. It was based on a set of criteria answered to A Safety Guide of the IAEA Site Survey for Nuclear Power Plants and requirements to be

  5. A five MW nuclear heating reactor

    International Nuclear Information System (INIS)

    Zhang Dafang; Don Duo; Su Quingshan

    1997-01-01

    The 5 MW Nuclear Heating Reactor (NHR-5) developed and designed by the Institute of Nuclear Energy and Technology (INET) and has been operated for four winter seasons since 1989. During the time of commissioning and operation a number of experiments including self-stability, self-regulation and simulation of ATWS etc. were carried out. Some operating experiences such as water chemistry, radiation protection, and environmental impacts and so on, were also obtained at the same time. All of these demonstrate that the design of NHR-5 is successful. (author)

  6. HFBR restart activity A2.6: Review of FSAR and 60 MW addendum to assure consistency of operation at 40 MW

    International Nuclear Information System (INIS)

    Rao, D.V.; Ross, S.B.; Darby, J.L.; Clark, R.A.

    1990-01-01

    The purpose of this task (HFBR Restart Activity A2.6) is to perform a review of the design basis accident (DBA) analyses sections of the 1964 HFBR-Final Safety Analysis Report; Volumes I and II, and the 1982 Addendum to the HFBR-FSAR for 60 MW operation to assure that operation at 40 MW will be consistent with these analyses. Additional documents utilized in the review included the Level 1 PRA for HFBR, HFBR-PDMs and HFBR-OPMs. The review indicates that the 1964 FSAR-DBA analysis in incomplete in the sense that it did not analyze some of the important initiators for 1-loop operation that include: Accidental throttling of primary flow control valves; seizure of primary pump; loss of secondary pump; accidental throttling of secondary flow control valves; rupture of secondary piping. The first three initiators were later studied in the 1982 addendum. The other two initiators have not been examined to-date for 1-loop operation. It is recommended that the impact of these initiators be assessed prior to the restart, if 1-loop operation is chosen for the restart. The review demonstrated that at 40 MW operation there are only a few accident initiators that will culminate in core damage (fuel melting and /or cladding failure) regardless of the availability of mitigating systems. For 1-loop Operation these accidents include: Fuel channel blockage, primary pump seizure, and large-large LOCA (a LOCA with effective break diameter > 2.81 in. is referred to as a large-large LOCA in this document as well as in PRA). Although all these accidents listed above could lead to core damage for 1-loop operation as well, the probability is expected be very low

  7. 4 MW upgrade to DIII-D FWCD system: System commissioning and initial operation

    International Nuclear Information System (INIS)

    Cary, W.P.; Callis, R.W.; deGrassie, J.S.; Harris, T.E.; O'Neill, R.C.; Pinsker, R.I.; Baity, F.W.; Barber, G.C.; Ferguson, S.W.

    1995-01-01

    The initial installation of the 4 MW fast wave current drive (FWCD) upgrade started in 1992 with the purchase of two ABB/Thomcast AG rf power amplifiers. These amplifiers cover the frequency range 30 MHz to 120 MHz. A maximum output power of over 2 MW between 30 MHz and 80 MHz and 1 MW at 120 MHz were the specification requirements. The system as installed is comprised of the two mentioned rf amplifiers, coaxial transmission and matching components, rf phase and amplitude monitoring, and a SUN SparcStation 10 control system. Due to various reasons almost every major component in the system required redesign and engineering in order to meet the system requirements. The failures, probable cause and the final redesigns will be discussed as well as some thoughts on how better to specify system requirements for future systems

  8. 4 MW upgrade to DIII-D FWCD system: System commissioning and initial operation

    International Nuclear Information System (INIS)

    Cary, W.P.; Callis, R.W.; Grassie, J.S. de; Harris, T.E.; O'Neill, R.C.; Pinsker, R.I.; Baity, F.W.; Barber, G.C.; Ferguson, S.W.

    1995-10-01

    The initial installation of the 4 MW fast wave current drive (FWCD) upgrade started in 1992 with the purchase of two ABB/Thomcast AG rf power amplifiers. These amplifiers cover the frequency range 30 MHz to 120 MHz. A maximum output power of over 2 MW between 30 MHz and 80 MHz and 1 MW at 120 MHz were the specification requirements. The system as installed is comprised of the two mentioned rf amplifiers, coaxial transmission and matching components, rf phase and amplitude monitoring, and a SUN SparcStation 10 control system. Due to various reasons almost every major component in the system required redesign and engineering in order to meet the system requirements. The failures, probable cause and the final redesigns will be discussed as well as some thoughts on how better to specify system requirements for future systems

  9. Natural gas for electric power generation: Strategic issues, risks and opportunities

    International Nuclear Information System (INIS)

    Linderman, C.

    1992-01-01

    Natural gas is again being regarded as a significant fuel for electric power generation. It was once a predominant fuel for utilities in gas-producing areas, but natural gas consumption declined greatly after the 1973 oil shock because of reduced electricity demand and increased coal and nuclear generation. Moreover, wellhead price and other forms of regulation produced gas shortages in the 1970s. The resurgence of natural gas in future resource plans stems from its inherent ideal fuel characteristics: short lead time; low capital costs; small increments of modular capacity; delivered close to load centers; environmentally benign, preferable to oil and coal; and potential for high thermal efficiency in gas turbines. Natural gas, if available and attractively priced, is an ideal fuel for electric power generation. No other fuel shares these attractive characteristics, and utilities, facing higher than expected load growth, are relying on an increasing proportion of gas-fired combustion turbines, combined cycle plants, and cogeneration to meet a growing, yet uncertain, future demand for electricity. Despite these desirable operating characteristics, the varied past and uncertain future of natural gas markets raise legitimate concerns about the riskiness of current utility natural gas strategies. This report, which summarizes the major findings from research efforts, is intended to help utility decision-makers understand the full range of risks they face with natural gas electric power generation and to identify actions they can take to mitigate those risks

  10. Single-frequency blue light generation by single-pass sum-frequency generation in a coupled ring cavity tapered laser

    DEFF Research Database (Denmark)

    Jensen, Ole Bjarlin; Petersen, Paul Michael

    2013-01-01

    A generic approach for generation of tunable single frequency light is presented. 340 mW of near diffraction limited, single-frequency, and tunable blue light around 459 nm is generated by sum-frequency generation (SFG) between two tunable tapered diode lasers. One diode laser is operated in a ring...... cavity and another tapered diode laser is single-passed through a nonlinear crystal which is contained in the coupled ring cavity. Using this method, the single-pass conversion efficiency is more than 25%. In contrast to SFG in an external cavity, the system is entirely self-stabilized with no electronic...

  11. Distributed generation for sustainable development - Case Finland

    International Nuclear Information System (INIS)

    Helynen, S.

    2005-01-01

    During 1980's CHP production increased rapidly because the production of forest industry was growing fast and district heating networks were enlargened. Electricity prices were moderate because of large capacity additions using nuclear power. The competitiveness of CHP plants using solid fuel needed a minimum heat load of 200-300 GWh/a, which meant about 30 MW electricity. Natural gas fired CHP plants were competitive when annual heat loads were over 50 GWh. In the 1980's power plant investments, price of energy, and imports of fuels and electricity were regulated. Also most of the largest energy companies were owned by the state. Privatisation and deregulation started in the 1990's; deregulation of the electricity market was completed in 1996. In 1990's the smallest solid fuel CHPs were providing 5 MW electricity, the economy was guaranteed by investment subsidies up to the level of 30 %. Presently the competitiveness level has decreased to 1 3 MW electricity, and novel technologies with higher power-to-heat ratios have been developed. Kokemaeki CHP plant, having start-up in 2005, with a fixed bed gasifier for wood fuels connected combustion engines is presented, as well as other new demonstrated concepts. Both technical, economical and institutional issues on distributed generation and its connection to transmission and distribution networks of electricity, district heat and natural gas are described. The role of distributed generation in the deregulated energy market and the emission trade is discussed. (au)

  12. Internal Technical Report, Safety Analysis Report 5 MW(e) Raft River Research and Development Plant

    Energy Technology Data Exchange (ETDEWEB)

    Brown, E.S.; Homer, G.B.; Shaber, C.R.; Thurow, T.L.

    1981-11-17

    The Raft River Geothermal Site is located in Southern Idaho's Raft River Valley, southwest of Malta, Idaho, in Cassia County. EG and G idaho, Inc., is the DOE's prime contractor for development of the Raft River geothermal field. Contract work has been progressing for several years towards creating a fully integrated utilization of geothermal water. Developmental progress has resulted in the drilling of seven major DOE wells. Four are producing geothermal water from reservoir temperatures measured to approximately 149 C (approximately 300 F). Closed-in well head pressures range from 69 to 102 kPa (100 to 175 psi). Two wells are scheduled for geothermal cold 60 C (140 F) water reinjection. The prime development effort is for a power plant designed to generate electricity using the heat from the geothermal hot water. The plant is designated as the ''5 MW(e) Raft River Research and Development Plant'' project. General site management assigned to EG and G has resulted in planning and development of many parts of the 5 MW program. Support and development activities have included: (1) engineering design, procurement, and construction support; (2) fluid supply and injection facilities, their study, and control; (3) development and installation of transfer piping systems for geothermal water collection and disposal by injection; and (4) heat exchanger fouling tests.

  13. The moment magnitude Mw and the energy magnitude Me: common roots and differences

    OpenAIRE

    2010-01-01

    Abstract Starting from the classical empirical magnitude-energy relationships, in this article, the derivation of the modern scales for moment magnitude Mw and energy magnitude Me is outlined and critically discussed. The formulas for Mw and Me calculation are presented in a way that reveals, besides the contributions of the physically defined measurement parameters seismic moment M0 and radiated seismic energy ES, the role of the constants in the classical Gutenberg?Richter magnit...

  14. Thermal, thermo-hydraulic and thermo-mechanic analysis for fuel elements of IEA-R1 reactor at 5MW

    International Nuclear Information System (INIS)

    Teixeira e Silva, A.; Silva Macedo, L.V. da

    1989-01-01

    In connection with the on going conversion of IEA-R1 Research Reactor, operated by IPEN-CNEN/SP, from the use of highly enriched uranium (HEU) fuel to the use of low enriched uranium (LEU) fuel, steady-state thermal and thermo-hydraulic analysis of both existing HEU and proposed LEU cores under 2 MW operating conditions have been carried out. Keeping in mind the possibility of power upgrading, steady-state thermal, thermo-hydraulic and thermomechanical analysis of proposed LEU core under 5 MW operating conditions have also been carried out. The thermal and thermo-hydraulic analysis at 2 MW show that the conversion of the existing HEU core to be proposed LEU core will not change the reactor safety margins. Although the upgrading of the reactor power to 5 MW will result in safety margins lower than in case of 2MW, these will be still sufficient for optimum operation and safe behaviour. The thermomechanical analysis at 5 MW show that the thermal stresses induced in the fuel element will satisfy the design limits for mechanical strenght and elastic stability. (author) [pt

  15. Validation of Novel Planar Cell Design for MW-Scale SOFC Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Scott Swartz; Lora Thrun; Gene Arkenberg; Kellie Chenault

    2011-09-30

    This report describes the work completed by NexTech Materials, Ltd. during a three-year project to validate an electrolyte-supported planar solid oxide fuel cell design, termed the FlexCell, for coal-based, megawatt-scale power generation systems. This project was focused on the fabrication and testing of electrolyte-supported FlexCells with yttria-stabilized zirconia (YSZ) as the electrolyte material. YSZ based FlexCells were made with sizes ranging from 100 to 500 cm{sup 2}. Single-cell testing was performed to confirm high electrochemical performance, both with diluted hydrogen and simulated coal gas as fuels. Finite element analysis modeling was performed at The Ohio State University was performed to establish FlexCell architectures with optimum mechanical robustness. A manufacturing cost analysis was completed, which confirmed that manufacturing costs of less than $50/kW are achievable at high volumes (500 MW/year). DISCLAIMER

  16. Duration of Tsunami Generation Longer than Duration of Seismic Wave Generation in the 2011 Mw 9.0 Tohoku-Oki Earthquake

    Science.gov (United States)

    Fujihara, S.; Korenaga, M.; Kawaji, K.; Akiyama, S.

    2013-12-01

    We try to compare and evaluate the nature of tsunami generation and seismic wave generation in occurrence of the 2011 Tohoku-Oki earthquake (hereafter, called as TOH11), in terms of two type of moment rate functions, inferred from finite source imaging of tsunami waveforms and seismic waveforms. Since 1970's, the nature of "tsunami earthquakes" has been discussed in many researches (e.g. Kanamori, 1972; Kanamori and Kikuchi, 1993; Kikuchi and Kanamori, 1995; Ide et al., 1993; Satake, 1994) mostly based on analysis of seismic waveform data , in terms of the "slow" nature of tsunami earthquakes (e.g., the 1992 Nicaragura earthquake). Although TOH11 is not necessarily understood as a tsunami earthquake, TOH11 is one of historical earthquakes that simultaneously generated large seismic waves and tsunami. Also, TOH11 is one of earthquakes which was observed both by seismic observation network and tsunami observation network around the Japanese islands. Therefore, for the purpose of analyzing the nature of tsunami generation, we try to utilize tsunami waveform data as much as possible. In our previous studies of TOH11 (Fujihara et al., 2012a; Fujihara et al., 2012b), we inverted tsunami waveforms at GPS wave gauges of NOWPHAS to image the spatio-temporal slip distribution. The "temporal" nature of our tsunami source model is generally consistent with the other tsunami source models (e.g., Satake et al, 2013). For seismic waveform inversion based on 1-D structure, here we inverted broadband seismograms at GSN stations based on the teleseismic body-wave inversion scheme (Kikuchi and Kanamori, 2003). Also, for seismic waveform inversion considering the inhomogeneous internal structure, we inverted strong motion seismograms at K-NET and KiK-net stations, based on 3-D Green's functions (Fujihara et al., 2013a; Fujihara et al., 2013b). The gross "temporal" nature of our seismic source models are generally consistent with the other seismic source models (e.g., Yoshida et al

  17. Influence of quality coal combustion and domestic stoves outbreaks steam generators and the environmental pollution

    OpenAIRE

    Petrilean, Dan Codrut

    2008-01-01

    It was drawn balance a steam generator. We determined the pollutant emissions from coal combustion in the furnace Jiu Valley steam generator with an output of 150 MW. As an example of the steam generator was considered the type BabkoK Hitachi with turbine Turbao + Atom, in cogeneration.

  18. Simulations of wind turbine rotor with vortex generators

    DEFF Research Database (Denmark)

    Sørensen, Niels N.; Zahle, Frederik; Sørensen, Niels N.

    2016-01-01

    This work presents simulations of the DTU 10MW wind turbine rotor equipped with vortex generators (VGs) on the inner part of the blades. The objective is to study the influence of different VG configurations on rotor performance and in particular to investigate the radial dependence of VGs, i...

  19. Potential for Usage of Thermoelectric Generators on Ships

    DEFF Research Database (Denmark)

    Kristiansen, Nils; Nielsen, H.K.

    2010-01-01

    The useful waste heat potential for a bulk carrier has been evaluated as a preliminary step towards developing a thermoelectric generator (TEG) waste heat recovery system for ships. A medium-sized bulk carrier produces 6.2 MW of waste heat, and the most promising usable sources for the TEG...

  20. Gas-fired Power Generation in India: Challenges and opportunities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    India's fast growing economy needs to add 100,000 MW power generating capacity between 2002-2012. Given limitations to the use of coal in terms of environmental considerations, quality and supply constraints, gas is expected to play an increasingly important role in India's power sector. This report briefs NMC Delegates on the potential for gas-fired power generation in India and describes the challenges India faces to translate the potential for gas-fired power generation into reality.

  1. Power generation in the 12-th five-year plan

    International Nuclear Information System (INIS)

    Troitskij, A.A.

    1986-01-01

    The state of electric power generation in the 11-th five-year plan is summed up. Perspectives of development of heat and electric power generation in the 12-th five-year plan are considered. Thermal power generation of NPPs in 1990 will increase by a factor of 8.4 as compared with 1975. The NPP development will be mainly realized on the basis of the WWER-1000 type reactors. It is planned to commission fast reactors of up to 800 MW

  2. Advanced exergoenvironmental assessment of a natural gas-fired electricity generating facility

    International Nuclear Information System (INIS)

    Açıkkalp, Emin; Aras, Haydar; Hepbasli, Arif

    2014-01-01

    Highlights: • Advanced exergoenvironmental analysis was conducted for an electricity generating facility. • Exergy destructions and environmental effects were divided into parts. • Environmental relations between the components were determined. • Environmental improvement strategies of the system were determined. - Abstract: This paper presents conventional and advanced exergoenvironmental analyses of an electricity generation facility located in the Eskisehir Industry Estate Zone, Turkey. This facility consists of gas turbine and steam cycles, which generate electrical power of approximately 37 MW and 18 MW, respectively. Exergy efficiency of the system is 0.402 and exergy destruction rate of the system is 78.242 MW. Unit exergy cost of electrical power generated by the system is 25.66 $/GJ and total exergoeconomic factor of the system is 0.279. Conventional exergy analysis method was applied to the system first. Next, exergy environmental impacts of exergy destruction rate within the facility’s components were divided into four parts generally, as endogenous, exogenous, avoidable and unavoidable environmental impact of exergy destruction rate. Through this analysis, improvement potential of the environmental impacts of the components and the overall system and the environmental relations between the components were then determined. Finally, exergoenvironmental factor was determined as 0.277 and environmental impact of the electricity was 8.472 (Pts/h). The system has 33% development potential for environmental impacts while its components have weak relations because of big endogenous parts of environmental impacts (80%). It may be concluded that advanced exergoenvironmental analysis indicated that priority should be given to the GT and CC, while defining the improvement strategies

  3. Calculational criticality analyses of 10- and 20-MW UF6 freezer/sublimer vessels

    International Nuclear Information System (INIS)

    Jordan, W.C.

    1993-02-01

    Calculational criticality analyses have been performed for 10- and 20-MW UF 6 freezer/sublimer vessels. The freezer/sublimers have been analyzed over a range of conditions that encompass normal operation and abnormal conditions. The effects of HF moderation of the UF 6 in each vessel have been considered for uranium enriched between 2 and 5 wt % 235 U. The results indicate that the nuclearly safe enrichments originally established for the operation of a 10-MW freezer/sublimer, based on a hydrogen-to-uranium moderation ratio of 0.33, are acceptable. If strict moderation control can be demonstrated for hydrogen-to-uranium moderation ratios that are less than 0.33, then the enrichment limits for the 10-MW freezer/sublimer may be increased slightly. The calculations performed also allow safe enrichment limits to be established for a 20-NM freezer/sublimer under moderation control

  4. RELAP5-3D Results for Phase I (Exercise 2) of the OECD/NEA MHTGR-350 MW Benchmark

    Energy Technology Data Exchange (ETDEWEB)

    Gerhard Strydom

    2012-06-01

    The coupling of the PHISICS code suite to the thermal hydraulics system code RELAP5-3D has recently been initiated at the Idaho National Laboratory (INL) to provide a fully coupled prismatic Very High Temperature Reactor (VHTR) system modeling capability as part of the NGNP methods development program. The PHISICS code consists of three modules: INSTANT (performing 3D nodal transport core calculations), MRTAU (depletion and decay heat generation) and a perturbation/mixer module. As part of the verification and validation activities, steady state results have been obtained for Exercise 2 of Phase I of the newly-defined OECD/NEA MHTGR-350 MW Benchmark. This exercise requires participants to calculate a steady-state solution for an End of Equilibrium Cycle 350 MW Modular High Temperature Reactor (MHTGR), using the provided geometry, material, and coolant bypass flow description. The paper provides an overview of the MHTGR Benchmark and presents typical steady state results (e.g. solid and gas temperatures, thermal conductivities) for Phase I Exercise 2. Preliminary results are also provided for the early test phase of Exercise 3 using a two-group cross-section library and the Relap5-3D model developed for Exercise 2.

  5. Detailed Load Analysis of the baseline 5MW DeepWind Concept

    DEFF Research Database (Denmark)

    Verelst, David Robert; Aagaard Madsen, Helge; Kragh, Knud Abildgaard

    This report presents an overview of the design of the DeepWind vertical axis oating wind turbine. One could present this as the "nal design", however, it is hoped that more design iterations will follow in the future, but under the umbrella of new and dierent projects. The state of the design...... that is reported here will be called version 2.2.0. The numbering system has just been introduced at the present design version, but the rst 5MW design called the "baseline design" [1] was developed in 2011 and this will therefore be called version 1.0.0. In this report, the design loads of the DeepWind 5 MW...

  6. Development of steady-state 2 MW, 170 GHz gyrotrons for ITER

    International Nuclear Information System (INIS)

    Piosczyk, B.; Arnold, A.; Thumm, M.; Dammertz, G.; Heidinger, R.; Illy, S.; Jin, J.; Koppenburg, K.; Leonhardt, W.; Neffe, G.; Rzesnicki, T.; Schmid, M.; Yang, X.; Alberti, S.; Chavan, R.; Fasel, D.; Goodman, T.; Henderson, M.; Hogge, J.P.; Tran, M.Q.; Yovchev, I.; Erckmann, V.; Laqua, H.P.; Michel, G.; Gantenbein, G.; Kasparek, W.; Mueller, G.; Schwoerer, K.; Bariou, D.; Beunas, A.; Giguet, E.; LeCloarec, G.; Legrand, F.; Lievin, C.; Dumbrajs, O.

    2005-01-01

    A prototype of a 1 MW, CW, 140 GHz conventional gyrotron for the W7-X stellarator in Greifswald/Germany has been tested successfully and the fabrication of series tubes started. In extended studies the feasibility for manufacturing a continuously operated high power coaxial cavity gyrotron has been demonstrated and all needed data for an industrial design has been obtained. Based on this results the fabrication of a first prototype of a 2 MW, CW, 170 GHz coaxial cavity gyrotron started recently in cooperation between European research institutions and European tube industry. The prototype tube is foreseen to be tested in 2006 at CRPP Lausanne where a suitable test facility is under construction. (author)

  7. Economic and Environmental Assessment of a 1 MW Grid Connected Rooftop Solar PV System for Energy Efficient Building in Bangladesh

    Science.gov (United States)

    Chakraborty, Sanjib; Hosain, Rubayet; Rahman, Toufiqur; Rabbi, Ahmead Fazle

    This paper evaluates the potentiality of a 1 MW grid connected rooftop solar PV system for an Energy Efficient Building in Bangladesh, which was estimated by utilizing NASA SSE solar radiation data, PVsyst simulation software and RETScreen simulation software. Economic and environmental viability for a ten-storied building with roof area of 6,500 m2 in the Capital City of Bangladesh, Dhaka was assessed by using the RETScreen simulation software. The yearly electricity production of the proposed system was 1,581 MWh estimated by PVsyst where the technical prospective of gird-connected solar PV in Bangladesh was calculated as about 50,174 MW. The economic assessments were determined the simple payback in such a way that the generated electricity first fulfills the demand of the building, and then the rest of the energy is supplied to the grid. The result indicates that the roof top solar PV system for an Energy efficient building in Dhaka city has a favorable condition for development both in economic and environmental point of view.

  8. Microscale air quality impacts of distributed power generation facilities.

    Science.gov (United States)

    Olaguer, Eduardo P; Knipping, Eladio; Shaw, Stephanie; Ravindran, Satish

    2016-08-01

    The electric system is experiencing rapid growth in the adoption of a mix of distributed renewable and fossil fuel sources, along with increasing amounts of off-grid generation. New operational regimes may have unforeseen consequences for air quality. A three-dimensional microscale chemical transport model (CTM) driven by an urban wind model was used to assess gaseous air pollutant and particulate matter (PM) impacts within ~10 km of fossil-fueled distributed power generation (DG) facilities during the early afternoon of a typical summer day in Houston, TX. Three types of DG scenarios were considered in the presence of motor vehicle emissions and a realistic urban canopy: (1) a 25-MW natural gas turbine operating at steady state in either simple cycle or combined heating and power (CHP) mode; (2) a 25-MW simple cycle gas turbine undergoing a cold startup with either moderate or enhanced formaldehyde emissions; and (3) a data center generating 10 MW of emergency power with either diesel or natural gas-fired backup generators (BUGs) without pollution controls. Simulations of criteria pollutants (NO2, CO, O3, PM) and the toxic pollutant, formaldehyde (HCHO), were conducted assuming a 2-hr operational time period. In all cases, NOx titration dominated ozone production near the source. The turbine scenarios did not result in ambient concentration enhancements significantly exceeding 1 ppbv for gaseous pollutants or over 1 µg/m(3) for PM after 2 hr of emission, assuming realistic plume rise. In the case of the datacenter with diesel BUGs, ambient NO2 concentrations were enhanced by 10-50 ppbv within 2 km downwind of the source, while maximum PM impacts in the immediate vicinity of the datacenter were less than 5 µg/m(3). Plausible scenarios of distributed fossil generation consistent with the electricity grid's transformation to a more flexible and modernized system suggest that a substantial amount of deployment would be required to significantly affect air quality on

  9. Statistical characteristics of seismo-ionospheric GPS TEC disturbances prior to global Mw ≥ 5.0 earthquakes (1998-2014)

    Science.gov (United States)

    Shah, Munawar; Jin, Shuanggen

    2015-12-01

    Pre-earthquake ionospheric anomalies are still challenging and unclear to obtain and understand, particularly for different earthquake magnitudes and focal depths as well as types of fault. In this paper, the seismo-ionospheric disturbances (SID) related to global earthquakes with 1492 Mw ≥ 5.0 from 1998 to 2014 are investigated using the total electron content (TEC) of GPS global ionosphere maps (GIM). Statistical analysis of 10-day TEC data before global Mw ≥ 5.0 earthquakes shows significant enhancement 5 days before an earthquake of Mw ≥ 6.0 at a 95% confidence level. Earthquakes with a focal depth of less than 60 km and Mw ≥ 6.0 are presumably the root of deviation in the ionospheric TEC because earthquake breeding zones have gigantic quantities of energy at shallower focal depths. Increased anomalous TEC is recorded in cumulative percentages beyond Mw = 5.5. Sharpness in cumulative percentages is evident in seismo-ionospheric disturbance prior to Mw ≥ 6.0 earthquakes. Seismo-ionospheric disturbances related to strike slip and thrust earthquakes are noticeable for magnitude Mw6.0-7.0 earthquakes. The relative values reveal high ratios (up to 2) and low ratios (up to -0.5) within 5 days prior to global earthquakes for positive and negative anomalies. The anomalous patterns in TEC related to earthquakes are possibly due to the coupling of high amounts of energy from earthquake breeding zones of higher magnitude and shallower focal depth.

  10. Optimization of disk generator performance for base-load power plant systems applications

    International Nuclear Information System (INIS)

    Teare, J.D.; Loubsky, W.J.; Lytle, J.K.; Louis, J.F.

    1980-01-01

    Disk generators for use in base-load MHD power plants are examined for both open-cycle and closed-cycle operating modes. The OCD cases are compared with PSPEC results for a linear channel; enthalpy extractions up to 23% with 71% isentropic efficiency are achievable with generator inlet conditions similar to those used in PSPEC, thus confirming that the disk configuration is a viable alternative for base-load power generation. The evaluation of closed-cycle disks includes use of a simplified cycle model. High system efficiencies over a wide range of power levels are obtained for effective Hall coefficients in the range 2.3 to 4.9. Cases with higher turbulence (implying β/sub eff/ less than or equal to 2.4) yield high system efficiencies at power levels of 100 to 500 MW/sub e/. All these CCD cases compare favorably with linear channels reported in the GE ECAS study, yielding higher isentropic efficiences for a given enthalpy extraction. Power densities in the range 70 to 170 MW/m 3 appear feasible, leading to very compact generator configurations

  11. Acoustic leak detector in Monju steam generator

    International Nuclear Information System (INIS)

    Wachi, E.; Inoue, T.

    1990-01-01

    Acoustic leak detectors are equipped with the Monju steam generators for one of the R and D activities, which are the same type of the detectors developed in the PNC 50MW Steam Generator Test Facility. Although they are an additional leak detection system to the regular one in Monju SG, they would also detect the intermediate or large leaks of the SG tube failures. The extrapolation method of a background noise analysis is expected to be verified by Monju SG data. (author). 4 figs

  12. Concept design and coupled dynamic response analysis on 6-MW spar-type floating offshore wind turbine

    Science.gov (United States)

    Meng, Long; Zhou, Tao; He, Yan-ping; Zhao, Yong-sheng; Liu, Ya-dong

    2017-10-01

    Tower, Spar platform and mooring system are designed in the project based on a given 6-MW wind turbine. Under wind-induced only, wave-induced only and combined wind and wave induced loads, dynamic response is analyzed for a 6-MW Spar-type floating offshore wind turbine (FOWT) under operating conditions and parked conditions respectively. Comparison with a platform-fixed system (land-based system) of a 6-MW wind turbine is carried out as well. Results demonstrate that the maximal out-of-plane deflection of the blade of a Spar-type system is 3.1% larger than that of a land-based system; the maximum response value of the nacelle acceleration is 215% larger for all the designed load cases being considered; the ultimate tower base fore-aft bending moment of the Spar-type system is 92% larger than that of the land-based system in all of the Design Load Cases (DLCs) being considered; the fluctuations of the mooring tension is mainly wave-induced, and the safety factor of the mooring tension is adequate for the 6-MW FOWT. The results can provide relevant modifications to the initial design for the Spar-type system, the detailed design and model basin test of the 6-MW Spar-type system.

  13. On-Shore Central Hydraulic Power Generation for Wind and Tidal Energy

    Science.gov (United States)

    Jones, Jack A.; Bruce, Allan; Lim, Steven; Murray, Luke; Armstrong, Richard; Kimbrall, Richard; Cook-Chenault, Kimberly; DeGennaro, Sean

    2012-01-01

    Tidal energy, offshore wind energy, and onshore wind energy can be converted to electricity at a central ground location by means of converting their respective energies into high-pressure hydraulic flows that are transmitted to a system of generators by high-pressure pipelines. The high-pressure flows are then efficiently converted to electricity by a central power plant, and the low-pressure outlet flow is returned. The Department of Energy (DOE) is presently supporting a project led by Sunlight Photonics to demonstrate a 15 kW tidal hydraulic power generation system in the laboratory and possibly later submerged in the ocean. All gears and submerged electronics are completely eliminated. A second portion of this DOE project involves sizing and costing a 15 MW tidal energy system for a commercial tidal energy plant. For this task, Atlantis Resources Corporation s 18-m diameter demonstrated tidal blades are rated to operate in a nominal 2.6 m/sec tidal flow to produce approximately one MW per set of tidal blades. Fifteen units would be submerged in a deep tidal area, such as in Maine s Western Passage. All would be connected to a high-pressure (20 MPa, 2900 psi) line that is 35 cm ID. The high-pressure HEPG fluid flow is transported 500-m to on-shore hydraulic generators. HEPG is an environmentally-friendly, biodegradable, watermiscible fluid. Hydraulic adaptations to ORPC s cross-flow turbines are also discussed. For 15 MW of wind energy that is onshore or offshore, a gearless, high efficiency, radial piston pump can replace each set of top-mounted gear-generators. The fluid is then pumped to a central, easily serviceable generator location. Total hydraulic/electrical efficiency is 0.81 at full rated wind or tidal velocities and increases to 0.86 at 1/3 rated velocities.

  14. Expanding exports, increasing smog : Ontario Power Generation's and Hydro One's strategies to continue coal-fired electricity generation in Ontario

    International Nuclear Information System (INIS)

    Gibbons, J.

    2002-06-01

    The production of coal-fired electricity increased by approximately 150 per cent in Ontario between 1995 and 2000. As a result, the smog-causing emissions generated by the five coal-fired power plants operated by Ontario Power Generation caused an increase in smog and worsened air quality in the province as well as affecting air quality as far afield as the Atlantic provinces. Between 2002 and 2005, it is expected that the Pickering and Bruce nuclear plants will be returned to service, making the electricity generated by the coal plants surplus to Ontario's needs. Increasing this surplus are the planned natural gas generating stations. Ontario Power Generation is planning on using this surplus to export it to the United States rather than phasing out its reliance on coal. The increase in exports to the United States Northeast and Midwest is planned with Hydro One, already busy increasing its transmission capacity to the United States by 1,000 megawatt (MW). This plan involves laying 975 MW submarine cable from the Nanticoke Generating Station (operated by Ontario Power Generation) under Lake Erie to Pennsylvania, Ohio, or both states. At the moment, the exports are constrained by the government emissions limits imposed by the Ontario government on sulphur dioxide and nitrogen oxides. This constraint could be removed if Ontario Power Generation decides to pay further for pollution controls for sulphur dioxide and nitrogen oxides at its coal stations. Unfortunately, increasing the exports would also result in emissions increases for 28 other uncapped pollutants such as lead, mercury and arsenic. The author recommended that the Ontario government ban non-emergency coal-fired electricity exports to improve air quality in the province. refs., 8 figs

  15. Short history of steam generators in the USSR

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    The first power stations appeared in Russia in the late 1880s. Early pioneers in generator design are mentioned. Lenin considered power production essential for rapid industrialization. In the early 1920s power stations were designed to make use of local fuels: peat, brown coal, and anthracite culm. The high-pressure, once-through boiler technology was introduced in the 1930s. At the same time cogeneration was a widely used technology, and efforts were being made to increase boiler capacity. In 1939, in line with prewar policies of dispersing Soviet industry to protect it from enemy attack, boiler capacity was limited to 25 tons/hr. Almost all of the multi-drum boilers were destroyed as a result of WWII. A novel method of salvaging the boilers by welding 2 or 3 units together to make a single unit was implemented after the war. Research organizations are mentioned along with their specific contributions. Modern steam generators use boiler turbines and supercritical once-through boilers. It was only in the late 1950s that economic planners discovered that oil and gas in power stations was cost effective. In 1954 a 5-MW graphite-water reactor became the world's first nuclear power plant. For the next 20 years, two types of nuclear reactors began production: pressurized water-cooled, water-moderated reactors in the 200-400 MW range; and channel-type graphite-moderated, water-cooled reactors in the 100-200 MW range

  16. Electric Generators and their Control for Large Wind Turbines

    DEFF Research Database (Denmark)

    Boldea, Ion; Tutelea, Lucian; Rallabandi, Vandana

    2017-01-01

    induction generator, the cage rotor induction generator, and the synchronous generator with DC or permanent magnet excitation. The operating principle, performance, optimal design, and the modeling and control of the machine-side converter for each kind of generator are adressed and evaluated. In view......The electric generator and its power electronics interface for wind turbines (WTs) have evolved rapidly toward higher reliability and reduced cost of energy in the last 40 years. This chapter describes the up-to-date electric generators existing in the wind power industry, namely, the doubly fed...... of the fact that individual power rating of WTs has increased to around 10 MW, generator design and control technologies required to reach this power rating are discussed....

  17. Structural design study of a proton beam window for a 1-MW spallation neutron source

    CERN Document Server

    Teraoku, T; Ishikura, S; Kaminaga, M; Maekawa, F; Meigo, S I; Terada, A

    2003-01-01

    A 1-MW spallation neutron source aiming at materials and life science researches will be constructed under the JAERI-KEK High-intensity Proton Accelerator Project (J-PARC). A proton beam passes through a proton beam window, and be injected into a target of the neutron source. The proton beam window functions as a boundary wall between a high vacuum area in the proton beam line and a helium atmosphere at about atmospheric pressure in a helium vessel which contains the target and moderators. The proton beam window is cooled by light water because high heat-density is generated in the window material by interactions with the proton beam. Then, uniformity of the water flow is requested at the window to suppress a hot-spot that causes excessive thermal stress and cooling water boiling. Also, the window has to be strong enough in its structure for inner stress due to water pressure and thermal stress due to heat generation. In this report, we propose two types of proton beam windows; one flat-type that is easy to m...

  18. Smart Grids and Distributed Generation

    Directory of Open Access Journals (Sweden)

    Dorin BICĂ

    2018-06-01

    Full Text Available This paper describes the main characteristics of Smart Grids and distributed generation. Smart Grids can be defined as a modernization of the power system so it monitors, protects and automatically optimizes the operation of its interconnected elements (power plants, transmission and distribution system, industrial and residential loads. Distributed generation (DG refers to the production of electricity near the consumption place using renewable energy sources. A load flow analysis is performed for the IEEE14 system in which a DG source (a 5MW wind turbine is added that is on-grid or off-grid. The power losses are determined for these two cases.

  19. GE will finance 614-MW cogeneration plant

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    The General Electric Power Funding Corporation, a unit of GE Capital, will provide up to $870 million in construction and permanent financing, and letters of credit to Cogen Technologies of Houston, Texas. The agreement will fund the construction of a 614-megawatt (MW), combined-cycle cogeneration plant to be built in Linden, New Jersey, and for the purchase of gas properties. The plant will be owned by Cogen Technologies. The financing is one of the largest packages ever for a cogeneration plant, GE said

  20. Development of the C-band (5712 MHz) 50 MW class PPM klystron (2)

    International Nuclear Information System (INIS)

    Matsumoto, H.; Shintake, T.; Ohkubo, Y.; Taoka, H.; Ohhashi, K.; Kakuno, K.

    2001-01-01

    Hot isostatic pressing (HIP) technique has been firstly applied to fabricate a magnetic circuit in a PPM klystron. Simply stacking disks of the magnetic stainless-steel (Mag-SUS) and oxygen-free-copper (OFC) alternatively, and processing in a HIP vessel filled with pressurised Ar-gas at 1200-kgf/cm 2 and temperature of 800degC for 2 hours, they were bonded in one block with diffusion bonding. No brazing-alloys were used in this process. After machining the rf-cavities and beam drift-tube on the bonded PPM stack, they were assembled together in one body by means of conventional brazing method. The C-band PPM klystron based on this technique was fabricated in the course of the Linear Collider R and D. Out-put power of 37 MW was generated with 2.5-μsec pulse width and 50 pps repetition rate. (author)

  1. Pulse Compression Techniques for Laser Generated Ultrasound

    Science.gov (United States)

    Anastasi, R. F.; Madaras, E. I.

    1999-01-01

    Laser generated ultrasound for nondestructive evaluation has an optical power density limit due to rapid high heating that causes material damage. This damage threshold limits the generated ultrasound amplitude, which impacts nondestructive evaluation inspection capability. To increase ultrasound signal levels and improve the ultrasound signal-to-noise ratio without exceeding laser power limitations, it is possible to use pulse compression techniques. The approach illustrated here uses a 150mW laser-diode modulated with a pseudo-random sequence and signal correlation. Results demonstrate the successful generation of ultrasonic bulk waves in aluminum and graphite-epoxy composite materials using a modulated low-power laser diode and illustrate ultrasound bandwidth control.

  2. Some answers to power generation lie blowing in the wind

    Energy Technology Data Exchange (ETDEWEB)

    1975-10-02

    An assessment of wind power generation schemes by the Energy Technology Support Unit is reported. The capital cost of large, efficient windmills should be around 100--200 Pounds per installed kW and an optimum size for a single wind rotor would be 1 MW.

  3. Tsunamis from strike-slip earthquakes in the Wharton Basin, northeast Indian Ocean: March 2016 Mw7.8 event and its relationship with the April 2012 Mw 8.6 event

    Science.gov (United States)

    Heidarzadeh, Mohammad; Harada, Tomoya; Satake, Kenji; Ishibe, Takeo; Takagawa, Tomohiro

    2017-12-01

    The Wharton Basin, off southwest Sumatra, ruptured to a large intraplate left-lateral strike-slip Mw 7.8 earthquake on 2016 March 2. The epicentre was located ∼800 km to the south of another similar-mechanism intraplate Mw 8.6 earthquake in the same basin on 2012 April 11. Small tsunamis from these strike-slip earthquakes were registered with maximum amplitudes of 0.5-1.5 cm on DARTs and 1-19 cm on tide gauges for the 2016 event, and the respective values of 0.5-6 and 6-40 cm for the 2012 event. By using both teleseismic body waves and tsunami observations of the 2016 event, we obtained optimum slip models with rupture velocity (Vr) in the range of 2.8-3.6 km s-1 belonging to both EW and NS faults. While the EW fault plane cannot be fully ruled out, we chose the best model as the NS fault plane with a Vr of 3.6 km s-1, a maximum slip of 7.7 m and source duration of 33 s. The tsunami energy period bands were 4-15 and 7-24 min for the 2016 and 2012 tsunamis, respectively, reflecting the difference in source sizes. Seismicity in the Wharton Basin is dominated by large strike-slip events including the 2012 (Mw 8.6 and 8.2) and 2016 (Mw 7.8) events, indicating that these events are possible tsunami sources in the Wharton Basin. Cumulative number and cumulative seismic-moment curves revealed that most earthquakes are of strike-slip mechanisms and the largest seismic-moment is provided by the strike-slip earthquakes in this basin.

  4. 78 FR 26343 - Exelon Generation Company, LLC; Notice of Application Accepted for Filing, Soliciting Motions To...

    Science.gov (United States)

    2013-05-06

    ... mixed-flow Kaplan-type hydraulic turbines. Units 1, 3, 4, 6 and 7 have 47.7-megawatt (MW) generators... plant is integral with the dam and is composed of 13 turbine-generator units, draft tubes, and transformer bays. The first seven turbine-generating units (1-7) are completely enclosed within the powerhouse...

  5. Towards a 1 MW, 170 GHz gyrotron design for fusion application

    Science.gov (United States)

    Kumar, Anil; Kumar, Nitin; Singh, Udaybir; Bhattacharya, Ranajoy; Yadav, Vivek; Sinha, A. K.

    2013-03-01

    The electrical design of different components of 1 MW, 170 GHz gyrotron such as, magnetron injection gun, cylindrical interaction cavity and collector and RF window is presented in this article. Recently, a new project related to the development of 170 GHz, 1 MW gyrotron has been started for the Indian Tokamak. TE34,10 mode is selected as the operating mode after studied the problem of mode competition. The triode type geometry is selected for the design of magnetron injection gun (MIG) to achieve the required beam parameters. The maximum transverse velocity spread of 3.28% at the velocity ratio of 1.34 is obtained in simulations for a 40 A, 80 kV electron beam. The RF output power of more than 1 MW with 36.5% interaction efficiency without depressed collector is predicted by simulation in single-mode operation at 170 GHz frequency. The simulated single-stage depressed collector of the gyrotron predicted the overall device efficiencies >55%. Due to the very good thermal conductivity and very weak dependency of the dielectric parameters on temperature, PACVD diamond is selected for window design for the transmission of RF power. The in-house developed code MIGSYN and GCOMS are used for initial geometry design of MIG and mode selection respectively. Commercially available simulation tools MAGIC and ANSYS are used for beam-wave interaction and mechanical analysis respectively.

  6. Mid-IR supercontinuum generation beyond 7 μm using a silica-fluoride-chalcogenide fiber cascade

    DEFF Research Database (Denmark)

    Petersen, Christian Rosenberg; Moselund, Peter M.; Petersen, Christian

    2016-01-01

    and fluoride fibers by an amplified 1.55 μm nanosecond diode laser. By pumping a commercial Ge10As22Se68 single-material photonic crystal fiber with 135.7 mW of the pump continuum from 3.5- 4.4 μm, we obtained a continuum up to 7.2 μm with a total output power after the collimating lens of 54.5 mW, and 3.7 m......We report on an experimental demonstration of mid-infrared cascaded supercontinuum generation in commercial silica, fluoride, and chalcogenide fibers as a potentially cheap and practical alternative to direct pumping schemes. A pump continuum up to 4.4 μm was generated in cascaded silica...

  7. Virtual Generation (Energy Efficiency) The Cheapest Source For Power Generation

    Energy Technology Data Exchange (ETDEWEB)

    Hasnie, Sohail

    2010-09-15

    Energy efficiency is the cheapest source of energy that has escaped the minds of the politicians in the developing countries. This paper argues for large scale utility led end use efficiency programs in a new paradigm, where 1 million efficient light bulbs is synonymous to a 50 MW power station that costs only 2% of the traditional fossil fuel power station and zero maintenance. Bulk procurement, setting up new standards and generation of certified emissions reduction is part of this strategy. It discusses implementation of a $20 million pilot in the Philippines supported by the Asian Development Bank.

  8. Environmental and economic assessment of landfill gas electricity generation in Korea using LEAP model

    International Nuclear Information System (INIS)

    Shin, Ho-Chul; Park, Jin-Won; Kim, Ho-Seok; Shin, Eui-Soon

    2005-01-01

    As a measure to establish a climate-friendly energy system, Korean government has proposed to expand landfill gas (LFG) electricity generation capacity. The purpose of this paper is to analyze the impacts of LFG electricity generation on the energy market, the cost of generating electricity and greenhouse gases emissions in Korea using a computer-based software tool called 'Long-range Energy Alternative Planning system' (LEAP) and the associated 'Technology and Environmental Database'. In order to compare LFG electricity generation with existing other generating facilities, business as usual scenario of existing power plants was surveyed, and then alternative scenario investigations were performed using LEAP model. Different alternative scenarios were considered, namely the base case with existing electricity facilities, technological improvement of gas engine and LFG maximum utilization potential with different options of gas engine (GE), gas turbine (GT), and steam turbine (ST). In the technological improvement scenario, there will be 2.86 GWh or more increase in electricity output, decrease of 45 million won (Exchange rate (1$=1200 won)). in costs, and increase of 10.3 thousand ton of CO 2 in global warming potentials due to same period (5 year) of technological improvement. In the maximum utilization potential scenario, LFG electricity generation technology is substituted for coal steam, nuclear, and combined cycle process. Annual cost per electricity product of LFG electricity facilities (GE 58MW, GT 53.5MW, and ST 54.5MW) are 45.1, 34.3, and 24.4 won/kWh, and steam turbine process is cost-saving. LFG-utilization with other forms of energy utilization reduces global warming potential by maximum 75% with compared to spontaneous emission of CH 4 . LFG electricity generation would be the good solution for CO 2 displacement over the medium term and additional energy profits

  9. Xenon-induced axial power oscillations in the 400 MW PBMR

    International Nuclear Information System (INIS)

    Strydom, Gerhard

    2008-01-01

    The redistribution of the spatial xenon concentration in the 400 MW Pebble Bed Modular Reactor (PBMR) core has a non-linear, time-dependent feedback effect on the spatial power density during several types of operational transient events. Due to the inherent weak coupling that exists between the iodine and xenon formation and destruction rates, as well as the complicating effect of spatial variance in the thermal flux field, reactor cores have been analyzed for a number of decades for the occurrence and severity of xenon-induced axial power oscillations. Of specific importance is the degree of oscillation damping exhibited by the core during transients, which involves axial variations in the local power density. In this paper the TINTE reactor dynamics code is used to assess the stability of the current 400 MW PBMR core design with regard to axial xenon oscillations. The focus is mainly on the determination of the inherent xenon and power oscillation damping properties by utilizing a set of hypothetical control rod insertion transients at various power levels. The oscillation damping properties of two 100%-50%-100% load-follow transients, one of which includes the de-stabilizing axial effects of moving control rods, are also discussed in some detail. The study shows that, although first axial mode oscillations do occur in the 400 MW PBMR core, the inherent damping of these oscillations is high, and that none of the investigated load-follow transients resulted in diverging oscillations. It is also shown that the PBMR core exhibits no radial oscillation components for these xenon-induced axial power oscillations

  10. Marble Hill Nuclear Generating Station, Units 1 and 2. License application, PSAR, general information

    International Nuclear Information System (INIS)

    1975-01-01

    An application is presented for two PWR reactors to be constructed in Salud Township, Jefferson County, Indiana, about six miles northeast of New Washington on the Ohio River. Each unit will have a rated core power level of 3411 MW(t) with a corresponding electrical output of 1130 MW(e). Mechanical draft cooling towers will be provided. The facility, which will replicate the Byron facility will be employed for the generation of electricity for transmission, sale for resale, and distribution

  11. Improving 900 MW(e) PWR control rooms

    International Nuclear Information System (INIS)

    Bouat, M.; Marcille, R.

    1983-01-01

    Analyses of the behaviour of operators during operating tests on PWR units and the lessons learned from the TMI-2 accident have demonstrated the need to improve the interface between operators and the facilities they control. To that end, and to complement its establishment of safety panels, Electricite de France (EDF) embarked upon a study on the ''Modification of Control Desks and Boards'' in control rooms. This study, involving twenty-eight 900 MW(e) units, almost all of which are currently in service, began with an ergonomic analysis of control rooms by an external consultant, the ADERSA GERBIOS Association. This analysis was based on interviews with simulator instructors and operators, a study of the operation of the unit, and a general review of previous studies. The analysis began in October 1980 and resulted, in April 1981, in a critical report and a proposal to create a full-scale mock-up of a 900 MW(e) control room. Improvements to this were subsequently proposed, enabling options to be made between, among other things, active overall control panels and function-by-function control panels. Finally, a number of general principles, which largely encompass the operators' suggestions, were defined. The alterations to be made will make it necessary to revamp the control panels completely. The work and tests involved should match the duration of refuelling shut-downs. Audio-visual training programmes are planned (portable model). (author)

  12. Evaluation methods of solar contribution in solar aided coal-fired power generation system

    International Nuclear Information System (INIS)

    Zhu, Yong; Zhai, Rongrong; Zhao, Miaomiao; Yang, Yongping; Yan, Qin

    2015-01-01

    Highlights: • Five methods for evaluating solar contribution are analyzed. • Method based on the second law of thermodynamics and thermal economics is more suitable for SACPGS. • Providing reliable reference for the formulation of feed-in tariff policies in China. - Abstract: Solar aided coal-fired power plants utilize solar thermal energy to couple with coal-fired power plants of various types by adopting characteristics of different thermal needs of plants. In this way, the costly thermal storage system and power generating system will become unnecessary, meanwhile the intermittent and unsteady nature of power generation can be avoided. In addition, large-scale utilization of solar thermal power and energy saving can be achieved. With the ever-deepening analyses of solar aided coal-fired power plants, the contribution evaluating system of solar thermal power is worth further exploration. In this paper, five common evaluation methods of solar contribution are analyzed, and solar aided coal-fired power plants of 1000 MW, 600 MW and 330 MW are studied with these five methods in a comparative manner. Therefore, this study can serve as a theoretical reference for future research of evaluation methods and subsidies for new energy

  13. Operating experience with 600 MW steam turbosets

    International Nuclear Information System (INIS)

    Tinapp, J.

    1978-01-01

    The turbosets of the 600 MW line are machines with 4 casing, with a single-flow high-pressure turbine, a double-flow MD part, and two double-flow low-pressure turbines. The common design of all BBC turbosets of this size is explained, with a few remarks on the typical constructional features of BBC technology. The plant has a mean availability of 96% and a mean forced shutdown rate of 1.2%. A table gives a survey of the start-up procedure and the operating results so far. (GL) [de

  14. SIROCCO project: 15 advanced instructor desk and 4 simulated control room for 900MW and 1300MW EDF power plant simulators

    International Nuclear Information System (INIS)

    Alphonse, J.; Roth, P.; Sicard, Y.; Rudelli, P.

    2006-01-01

    This presentation describes the fifteen advanced instructors station and four simulated control delivered to EDF in the frame of the SIROCCO project by the Consortium formed by ATOS Origin, CORYS Tess, for the Electricite de France (EDF). These instructor stations are installed on fifteen replica training simulators located on different sites throughout France for the purposes of improving the job-related training of the EDF PWR nuclear power plant operating teams. This covers all 900 MW and 1300MW nuclear power plant of EDF. The simulated control rooms are installed on maintenance platform located at EDF and the consortium facilities. The consortium uses it to maintain and upgrade the simulators. EDF uses it to validate the upgrade delivered by the consortium before on site installation and to perform engineering analysis. This presentation sets out successively: - The major advantages of the generic and configurable connected module concept for flexible and quick adaptation to different simulators; - The innovative functionalities of the advanced Instructor Desk (IS) which make the instructor's tasks of preparation, monitoring and postanalysis of a training session easier and more homogeneous; - The use of the Simulated Control Room (SCR) for training purposes but also for those of maintenance and design studies for upgrades of existing control rooms

  15. Characterization of a Power Electronic Grid Simulator for Wind Turbine Generator Compliance Testing

    DEFF Research Database (Denmark)

    Glasdam, Jakob Bærholm; Gevorgian, V.; Wallen, R.

    2014-01-01

    This paper presents the commissioning results and testing capabilities of a multi-megawatt power electronic grid simulator situated in National Renewable Energy Laboratory’s (NREL’s) new testing facility. The commissioning is done using a commercial type 4 multi-megawatt sized wind turbine...... generator (WTG) installed in NREL’s new 5 MW dynamometer and a kilowatt sized type 1 WTG connected to the existing 2.5 MW dynamometer at NREL. The paper demonstrates the outstanding testing capability of the grid simulator and its application in the grid code compliance evaluation of WTGs including balanced...

  16. Potentials for site-specific design of MW sized wind turbines

    DEFF Research Database (Denmark)

    Thomsen, K.; Fuglsang, P.; Schepers, G.

    2001-01-01

    The potential for site specific design of MW sized wind turbines is quantified by comparing design loads for wind turbines installed at a range of different sites. The sites comprise on-shore normal flat terrain stand-alone conditions and wind farm conditions together with offshore and mountainous...

  17. 100 GHz, 1 MW, CW gyrotron study program. Final report

    International Nuclear Information System (INIS)

    Felch, K.; Bier, R.; Caplan, M.; Jory, H.

    1983-09-01

    The results of a study program to investigate the feasibility of various approaches in designing a 100 GHz, 1 MW CW gyrotron are presented. A summary is given of the possible configurations for a high average power, high frequency gyrotron, including an historical survey of experimental results which are relevant to the various approaches. A set of basic scaling considerations which enable qualitative comparisons between particular gyrotron interaction circuits is presented. These calculations are important in understanding the role of various electron beam and circuit parameters in achieving a viable gyrotron design. Following these scaling exercises, a series of design calculations is presented for a possible approach in achieving 100 GHz, 1 MW CW. These calculations include analyses of the electron gun and interaction circuit parts of the gyrotron, and a general analysis of other aspects of a high average power, high frequency gyrotron. Scalability of important aspects of the design to other frequencies is also discussed, as well as key technology issues

  18. Long pulse characteristics of 5 MW ion source for SST-1 neutral beam injector

    Energy Technology Data Exchange (ETDEWEB)

    Jana, M.R. [Institute for Plasma Research, Bhat, Gandhinagar 382428 (India)], E-mail: mukti@ipr.res.in; Mattoo, S.K.; Chakraborty, A.K.; Baruah, U.K.; Patel, G.B.; Jayakumar, P.K. [Institute for Plasma Research, Bhat, Gandhinagar 382428 (India)

    2008-10-15

    We present characteristics of a 5 MW ion source for SST-1 neutral beam injector. Before the source could be tested for its performance, it was conditioned by 480 arc discharges of 1 s and beam extraction of hydrogen species at various beam voltages ranging between 19 kV and 56 kV. Breakdown free beam extraction could be secured only after about 3000 beam second extraction. The ion source is capable of delivering 1.7 MW of neutral beam power at 55 kV with horizontal and vertical focal length of 5.4 m and 7 m respectively. Beam divergence is {approx}0.97 deg. Steady-state beam energy of 31 MJ at 41 kV was achieved during 14 s long beam extraction. We have not noticed any deterioration of beam parameters, including beam divergence during long pulse operation. These results indicate that 0.5 MW of neutral beam power at 30 kV required for heating of plasma in SST-1 can be delivered.

  19. Long pulse characteristics of 5 MW ion source for SST-1 neutral beam injector

    International Nuclear Information System (INIS)

    Jana, M.R.; Mattoo, S.K.; Chakraborty, A.K.; Baruah, U.K.; Patel, G.B.; Jayakumar, P.K.

    2008-01-01

    We present characteristics of a 5 MW ion source for SST-1 neutral beam injector. Before the source could be tested for its performance, it was conditioned by 480 arc discharges of 1 s and beam extraction of hydrogen species at various beam voltages ranging between 19 kV and 56 kV. Breakdown free beam extraction could be secured only after about 3000 beam second extraction. The ion source is capable of delivering 1.7 MW of neutral beam power at 55 kV with horizontal and vertical focal length of 5.4 m and 7 m respectively. Beam divergence is ∼0.97 deg. Steady-state beam energy of 31 MJ at 41 kV was achieved during 14 s long beam extraction. We have not noticed any deterioration of beam parameters, including beam divergence during long pulse operation. These results indicate that 0.5 MW of neutral beam power at 30 kV required for heating of plasma in SST-1 can be delivered.

  20. Thermophotovoltaic Arrays for Electrical Power Generation

    International Nuclear Information System (INIS)

    Sarnoff Corporation

    2003-01-01

    Sarnoff has designed an integrated array of thermophotovoltaic (TPV) cells based on the In(Al)GaAsSb/GaSb materials system. These arrays will be used in a system to generate electrical power from a radioisotope heat source that radiates at temperatures from 700 to 1000 C. Two arrays sandwich the slab heat source and will be connected in series to build voltage. Between the arrays and the heat source is a spectral control filter that transmits above-bandgap radiation and reflects below-bandgap radiation. The goal is to generate 5 mW of electrical power at 3 V from a 700 C radiant source. Sarnoff is a leader in antimonide-based TPV cell development. InGaAsSb cells with a bandgap of 0.53 eV have operated at system conversion efficiencies greater than 17%. The system included a front-surface filter, and a 905 C radiation source. The cells were grown via organo-metallic vapor-phase epitaxy. Sarnoff will bring this experience to bear on the proposed project. The authors first describe array and cell architecture. They then present calculated results showing that about 80 mW of power can be obtained from a 700 C radiator. Using a conservative array design, a 5-V output is possible

  1. Far-field tsunami of 2017 Mw 8.1 Tehuantepec, Mexico earthquake recorded by Chilean tide gauge network: Implications for tsunami warning systems

    Science.gov (United States)

    González-Carrasco, J. F.; Benavente, R. F.; Zelaya, C.; Núñez, C.; Gonzalez, G.

    2017-12-01

    The 2017 Mw 8.1, Tehuantepec earthquake generated a moderated tsunami, which was registered in near-field tide gauges network activating a tsunami threat state for Mexico issued by PTWC. In the case of Chile, the forecast of tsunami waves indicate amplitudes less than 0.3 meters above the tide level, advising an informative state of threat, without activation of evacuation procedures. Nevertheless, during sea level monitoring of network we detect wave amplitudes (> 0.3 m) indicating a possible change of threat state. Finally, NTWS maintains informative level of threat based on mathematical filtering analysis of sea level records. After 2010 Mw 8.8, Maule earthquake, the Chilean National Tsunami Warning System (NTWS) has increased its observational capabilities to improve early response. Most important operational efforts have focused on strengthening tide gauge network for national area of responsibility. Furthermore, technological initiatives as Integrated Tsunami Prediction and Warning System (SIPAT) has segmented the area of responsibility in blocks to focus early warning and evacuation procedures on most affected coastal areas, while maintaining an informative state for distant areas of near-field earthquake. In the case of far-field events, NTWS follow the recommendations proposed by Pacific Tsunami Warning Center (PTWC), including a comprehensive monitoring of sea level records, such as tide gauges and DART (Deep-Ocean Assessment and Reporting of Tsunami) buoys, to evaluate the state of tsunami threat in the area of responsibility. The main objective of this work is to analyze the first-order physical processes involved in the far-field propagation and coastal impact of tsunami, including implications for decision-making of NTWS. To explore our main question, we construct a finite-fault model of the 2017, Mw 8.1 Tehuantepec earthquake. We employ the rupture model to simulate a transoceanic tsunami modeled by Neowave2D. We generate synthetic time series at

  2. Design of the 1-Mw, 200-Ghz, Fom Fusion Fem

    NARCIS (Netherlands)

    Urbanus, W. H.; Best, R. W. B.; Bongers, W. A.; Vaningen, A. M.; Manintveld, P.; Sterk, A. B.; Verhoeven, A. G. A.; van der Wiel, M. J.; Caplan, M.; Bratman, V. L.; Denisov, G. G.; Varfolomeev, A. A.; Khlebnikov, A. S.

    1993-01-01

    The FOM Institute for Plasma Physics has obtained funding for the development of a 1 MW, long pulse, 140-250 GHz free-electron maser. The engineering design is presently being performed in an international collaboration. In this paper the main components of the free-electron maser, the electron beam

  3. Hydraulic turbines uses for rural electric generation

    International Nuclear Information System (INIS)

    Genta, J.; Nunes, V.

    1994-01-01

    The micro turbines use for electric generation either in autonomous systems or in connection to the national net is presented like an alternative whose viability has been studied in the Agreement taken place between the UTE Administracion Nacional de Usinas y transmisiones Electricas y la Facultad de Ingenieria. The Agreement S tudy for the Installation of Micro turbines that initially considered areas far from the national electric net it extended then to near areas to the same one to analyze the cogeneration alternative. They were considered smaller and bigger powers than 1 MW and up to 5MW. For the whole study range a methodology is described of calculate primary, starting from a minimum of field information that allows a first estimate of viability of a certain place and the selection of the turbine type, for a later detailed study

  4. Using Flow Electrodes in Multiple Reactors in Series for Continuous Energy Generation from Capacitive Mixing

    KAUST Repository

    Hatzell, Marta C.

    2014-12-09

    Efficient conversion of “mixing energy” to electricity through capacitive mixing (CapMix) has been limited by low energy recoveries, low power densities, and noncontinuous energy production resulting from intermittent charging and discharging cycles. We show here that a CapMix system based on a four-reactor process with flow electrodes can generate constant and continuous energy, providing a more flexible platform for harvesting mixing energy. The power densities were dependent on the flow-electrode carbon loading, with 5.8 ± 0.2 mW m–2 continuously produced in the charging reactor and 3.3 ± 0.4 mW m–2 produced in the discharging reactor (9.2 ± 0.6 mW m–2 for the whole system) when the flow-electrode carbon loading was 15%. Additionally, when the flow-electrode electrolyte ion concentration increased from 10 to 20 g L–1, the total power density of the whole system (charging and discharging) increased to 50.9 ± 2.5 mW m–2.

  5. The co-generation file

    International Nuclear Information System (INIS)

    Signoret, Stephane; Petitot, Pauline; Mary, Olivier; Sredojevic, Alexandre

    2017-01-01

    Whereas co-generation has many benefits (increase of energy efficiency, decrease of greenhouse gas emissions, job creation, integration of renewable energies, local and efficient production of heat and electricity, and so on), as explained in a first article, it has not enough public support in France any longer, notably for installations of more than 1 MW. However, as shown in some examples (a power and heat plant in Aulnay-sous-Bois, a factory in Graulhet), some co-generation installations have been able to take some benefit from the situation in 2015. Besides, some technological development are addressed: new burners to comply with regulations regarding NO_x and CO emissions, new engines able to operate with various gases such as hydrogen or gas produced by biomass gasification. A last article presents a co-generation boiler installed in a medical care home near Roye in the Somme district

  6. Investigating the effect of several thermodynamic parameters on exergy destruction in components of a tri-generation cycle

    International Nuclear Information System (INIS)

    Salehzadeh, A.; Khoshbakhti Saray, R.; JalaliVahid, D.

    2013-01-01

    Multiple energy generating cycles such as tri-generation cycles, which produce heat and cold in addition to power through burning of a primary fuel, have increasingly been used in recent decades. On the other hand, advanced exergy analysis of thermodynamic systems by splitting exergy destruction into endogenous and exogenous parts identifies internal irreversibilities of each of the components and the effect of these irreversibilities on the performance of other components. Therefore, main sources of exergy destruction in cycles can be highlighted and useful recommendations in order to improve the performance of thermodynamic cycles can be presented. In the present work, a tri-generation cycle with 100 MW power production, 70 MW heat and 9 MW cooling capacity is considered. For this tri-generation cycle, effects of various thermodynamic parameters on the amount of endogenous and exogenous exergy destructions, exergy loss and the amount of fuel consumption, are investigated. The results indicate that, increasing compressor pressure ratio, pre-heater outlet temperature and excess air leads to better combustion and lower exergy loss and fuel consumption. Increasing the mass flow rate of steam generator, while keeping the cycle outlet temperature constant and considering cooling capacity variable, lead to increase the first- and second-law efficiencies of the cycle. - Highlights: ► Advanced exergy analysis is used to analyze a tri-generation cycle. ► Increasing compressor pressure ratio leads to lower exergy loss and fuel consumption. ► Exergy loss is lowered by increasing pre-heater outlet temperature. ► Increasing the air flow rate of the cycle improves the performance of the cycle

  7. The Canadian intense neutron generator

    Energy Technology Data Exchange (ETDEWEB)

    Tunnicliffe, P R

    1967-07-01

    Atomic Energy of Canada Ltd. has proposed construction of an Intense Neutron-Generator. The generator would produce uniquely-intense beams of thermal neutrons for solid-state and low-energy nuclear studies and would yield significant quantities of radioisotopes of both research and commercial value; it would also produce copious sources of mesons and energetic nucleons for use in intermediate-energy nuclear physics and in nuclear-structure studies. The primary neutron source of 10{sup 19}/sec would be generated by bombarding a heavy-element target with a continuous beam of 65 mA of 1 GeV protons. The target of circulating and cooled Pb-Bi eutectic would be surrounded by a tank of heavy water moderator yielding a maximum useful flux of 10{sup 16} thermal neutrons/cm{sup 2}/sec in the region where neutron beams can be extracted. This high-energy spallation process for producing neutrons is nearly four times more efficient in producing neutrons per unit of thermal energy released in the neutron source compared with a fission reactor. Nevertheless, if energy costs for producing the 65 MW proton beam are to be within reason, the machine producing the beam must be efficient. A D.C. machine is in principle ideal but practical achievement of 1 GV is not likely within the time desired. An accelerator where the protons gain energy from radio-frequency fields is the most likely prospect. We have selected a linear accelerator as our reference design and detailed theoretical and experimental studies are in progress. The machine is based on the Los Alamos Meson Physics Facility design reoptimized for continuous rather than pulsed operation. It is approximately one mile long and is expected to achieve nearly 50 percent overall efficiency. There are two major portions, an 'Alvarez' Section operating at 200 MHz accelerating the beam to about 150 MeV, followed by a 'Waveguide' section operating at 800 MHz. Protons are initially injected by an 0.75 MV D.C. accelerator. The Alvarez

  8. Megavolt nanosecond generator with semiconductor current breaker

    CERN Document Server

    Bushlyakov, A I; Rukin, S N; Slovikovskij, B G; Timoshenkov, S P

    2002-01-01

    The heavy-current nanosecond generator with the pulse capacity up to 1.6 GW and output voltage of 0.5-1 MW is described. The generator contains four capacity storages, one induction storage and six solid body commutators: one thyristor, four magnetic commutators and a semiconductor current breaker on the SOS-diodes. The results of studies on the energy change-over efficiency through a semiconductor breaker by various external resistance loads as well as the results of the thermal and frequency tests are presented. It is established that selection of the optimal cooling system provides for the generator continuous mode of operation with the pulse sequence frequency from 300 Hz up to 850 Hz

  9. JET flywheel generators

    International Nuclear Information System (INIS)

    Huart, M.; Sonnerup, L.

    1986-01-01

    Two large vertical shaft flywheel generators each provides the JET device with peak power up to 400 MW and energy up to 2600 MJ per pulse to induce and confine the multi-mega-ampere plasma current. The integrated rotor flywheel consists of a 650 tonne/10 m diameter rim carrying the poles of the machine. The energy is stored kinetically during a 9 min interval of acceleration from half-speed to full-speed and then released during a 20 s long deceleration. A design life of 100 000 cycles at full energy rating was specified. The mechanical design and construction of the generators is reviewed. Particular attention is paid to the assessment of the stresses and fatigue life of the rotor system, its dynamic behaviour (rim movement, critical speed and balancing) and on the performance in operation of the large thrust bearing. (author)

  10. Energy and exergy evaluation of a 220MW thermal power plant ...

    African Journals Online (AJOL)

    Energy and exergy evaluation of a 220MW thermal power plant. ... Nigerian Journal of Technology ... At the variation of environmental or dead state temperature, ther e were no appreciable changes in the values of exergy efficiency of the ...

  11. Environmental assessment, proposed generating station for Darlington

    International Nuclear Information System (INIS)

    1975-04-01

    This document indicates the intention of Ontario Hydro to seek approval from the Provincial Government for its plan to construct and operate a 3400 MWe nuclear generating station at the Darlington site, west of Bowmanville. This preliminary proposal also contains the environmental assessment. The environmental section of this proposal describes and assesses the existing environment and the environmental influences which would occur due to the construction and operation of a nuclear generating station, consisting of four 850 MW units, at the Darlington site. This proposed station is similar to the Bruce GS A station presently under construction. (author)

  12. Generation of a single-cycle optical pulse

    International Nuclear Information System (INIS)

    Shverdin, M.Y.; Walker, D.R.; Yavuz, D.D.; Yin, G.Y.; Harris, S.E.

    2005-01-01

    We make use of coherent control of four-wave mixing to the ultraviolet as a diagnostic and describe the generation of a periodic optical waveform where the spectrum is sufficiently broad that the envelope is approximately a single-cycle in length, and where the temporal shape of this envelope may be synthesized by varying the coefficients of a Fourier series. Specifically, using seven sidebands, we report the generation of a train of single-cycle optical pulses with a pulse width of 1.6 fs, a pulse separation of 11 fs, and a peak power of 1 MW

  13. Final Report, Validation of Novel Planar Cell Design for MW-Scale SOFC Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Swartz, Dr Scott L.; Thrun, Dr Lora B.; Arkenberg, Mr Gene B.; Chenault, Ms Kellie M.

    2012-01-03

    This report describes the work completed by NexTech Materials, Ltd. during a three-year project to validate an electrolyte-supported planar solid oxide fuel cell design, termed the FlexCell, for coal-based, megawatt-scale power generation systems. This project was focused on the fabrication and testing of electrolyte-supported FlexCells with yttria-stabilized zirconia (YSZ) as the electrolyte material. YSZ based FlexCells were made with sizes ranging from 100 to 500 cm2. Single-cell testing was performed to confirm high electrochemical performance, both with diluted hydrogen and simulated coal gas as fuels. Finite element analysis modeling was performed at The Ohio State University was performed to establish FlexCell architectures with optimum mechanical robustness. A manufacturing cost analysis was completed, which confirmed that manufacturing costs of less than $50/kW are achievable at high volumes (500 MW/year).

  14. Intermediate heat exchanger design study of 25 MW straight-tube hexagonal modular type

    International Nuclear Information System (INIS)

    Okamoto, Masaharu; Tanaka, Toshiyuki

    1983-09-01

    The helium-to-helium Intermediate Heat Exchanger(IHX), straight-tube hexagonal modular type was designed at General Atomic Company(GA), which heat duty is 421 MW. For this type IHX, at the selection of basic design, emphasis is placed on cost reduction and size reduction. Then small diameter tube size(11.1 mm), with wall thickness of 1.2 mm is applied to this IHX, necessary for the compact surface geometry. The other side, the helical-tube type IHX was designed at JAERI, which heat duty is 25 MW. This paper discusses the referance design of 25 MW scale IHX, with GA type application. The basic feature of this type IHX is as follows. (1) Thermal stress is reduced, as a result of using small diameter and thin wall thickness tube. (2) The possible improvements can make for higher heat flux, because of short length tube, compare with helical or U-tube type. (3) The simple tube support can use compare with helical or U-tube type. The conclusion reached is that GA type IHX is about one forth compactness and one forth weight compare with helical tube IHX. (author)

  15. Study on Actuator Line Modeling of Two NREL 5-MW Wind Turbine Wakes

    Directory of Open Access Journals (Sweden)

    Ziying Yu

    2018-03-01

    Full Text Available The wind turbine wakes impact the efficiency and lifespan of the wind farm. Therefore, to improve the wind plant performance, research on wind plant control is essential. The actuator line model (ALM is proposed to simulate the wind turbine efficiently. This research investigates the National Renewable Energy Laboratory 5 Million Watts (NREL 5-MW wind turbine wakes with Open Field Operation and Manipulation (OpenFOAM using ALM. Firstly, a single NREL 5-MW turbine is simulated. The comparison of the power and thrust with Fatigue, Aerodynamics, Structures, and Turbulence (FAST shows a good agreement below the rated wind speed. The information relating to wind turbine wakes is given in detail. The top working status is proved at the wind speed of 8 m/s and the downstream distance of more than 5 rotor diameters (5D. Secondly, another case with two NREL 5-MW wind turbines aligned is also carried out, in which 7D is validated as the optimum distance between the two turbines. The result also shows that the upstream wind turbine has an obvious influence on the downstream one.

  16. Thermodynamic assessment of integrated biogas-based micro-power generation system

    International Nuclear Information System (INIS)

    Hosseini, Seyed Ehsan; Barzegaravval, Hasan; Wahid, Mazlan Abdul; Ganjehkaviri, Abdolsaeid; Sies, Mohsin Mohd

    2016-01-01

    Highlights: • A thermodynamic modelling of an integrated biogas-based micro-power generation system is reported. • The impact of design parameters on the thermodynamic performance of the system is evaluated. • High turbine inlet temperatures lead the system to the higher energy and exergy efficiency and higher power generation. • Enhancement of GT isentropic efficiency incurs negative effects on the performance of air preheater and heat exchanger. • The rate of power generation increases by the enhancement of steam turbine pressure in ORC. - Abstract: In this paper, a thermodynamic modelling of an integrated biogas (60%CH_4 + 40%CO_2) micro-power generation system for electricity generation is reported. This system involves a gas turbine cycle and organic Rankine cycle (ORC) where the wasted heat of gas turbine cycle is recovered by closed ORC. The net output power of the micro-power generation system is fixed at 1.4 MW includes 1 MW power generated by GT and 0.4 MW by ORC. Energy and exergy assessments and related parametric studies are carried out, and parameters that influence on energy and exergy efficiency are evaluated. The performance of the system with respect to variation of design parameters such as combustion air inlet temperature, turbine inlet temperature, compressor pressure ratio, gas turbine isentropic efficiency and compressor isentropic efficiency (from the top cycle) and steam turbine inlet pressure, and condenser pressure (from bottoming cycle) is evaluated. The results reveal that by the increase of gas turbine isentropic efficiency, the outlet temperature of gas turbine decreases which incurs negative impacts on the performance of air preheater and heat exchanger, however the energy and exergy efficiency increases in the whole system. By the increase of air compressor pressure ratio, the energy and exergy of the combined cycle decreases. The exergy efficiency of ORC alters by the variation of gas turbine parameters which can be

  17. Postseismic deformation following the 2010 Mw 8.8 Maule and 2014 Mw 8.1 Pisagua megathrust earthquakes in Chile

    Science.gov (United States)

    Weiss, J. R.; Saunders, A.; Qiu, Q.; Foster, J. H.; Gomez, D.; Bevis, M. G.; Smalley, R., Jr.; Cimbaro, S.; Lenzano, L. E.; Barón, J.; Baez, J. C.; Echalar, A.; Avery, J.; Wright, T. J.

    2017-12-01

    We use a large regional network of continuous GPS sites to investigate postseismic deformation following the Mw 8.8 Maule and Mw 8.1 Pisagua earthquakes in Chile. Geodetic observations of surface displacements associated with megathrust earthquakes aid our understanding of the subduction zone earthquake cycle including postseismic processes such as afterslip and viscoelastic relaxation. The observations also help place constraints on the rheology and structure of the crust and upper mantle. We first empirically model the data and find that, while single-term logarithmic functions adequately fit the postseismic timeseries, they do a poor job of characterizing the rapid displacements in the days to weeks following the earthquakes. Combined exponential-logarithmic functions better capture the inferred near-field transition between afterslip and viscous relaxation, however displacements are best fit by three-term exponential functions with characteristic decay times of 15, 250, and 1500 days. Viscoelastic modeling of the velocity field and timeseries following the Maule earthquake suggests that the rheology is complex but is consistent with a 100-km-thick asthenosphere channel of viscosity 1018 Pa s sandwiched between a 40-km-thick elastic lid and a strong viscoelastic upper mantle. Variations in lid thickness of up to 40 km may be present and in some locations rapid deformation within the first months to years following the Maule event requires an even lower effective viscosity or a significant contribution from afterslip. We investigate this further by jointly inverting the GPS data for the time evolution of afterslip and viscous flow in the mantle wedge surrounding the Maule event.

  18. 15 MW HArdware-in-the-loop Grid Simulation Project

    Energy Technology Data Exchange (ETDEWEB)

    Rigas, Nikolaos [Clemson Univ., SC (United States); Fox, John Curtiss [Clemson Univ., SC (United States); Collins, Randy [Clemson Univ., SC (United States); Tuten, James [Clemson Univ., SC (United States); Salem, Thomas [Clemson Univ., SC (United States); McKinney, Mark [Clemson Univ., SC (United States); Hadidi, Ramtin [Clemson Univ., SC (United States); Gislason, Benjamin [Clemson Univ., SC (United States); Boessneck, Eric [Clemson Univ., SC (United States); Leonard, Jesse [Clemson Univ., SC (United States)

    2014-10-31

    The 15MW Hardware-in-the-loop (HIL) Grid Simulator project was to (1) design, (2) construct and (3) commission a state-of-the-art grid integration testing facility for testing of multi-megawatt devices through a ‘shared facility’ model open to all innovators to promote the rapid introduction of new technology in the energy market to lower the cost of energy delivered. The 15 MW HIL Grid Simulator project now serves as the cornerstone of the Duke Energy Electric Grid Research, Innovation and Development (eGRID) Center. This project leveraged the 24 kV utility interconnection and electrical infrastructure of the US DOE EERE funded WTDTF project at the Clemson University Restoration Institute in North Charleston, SC. Additionally, the project has spurred interest from other technology sectors, including large PV inverter and energy storage testing and several leading edge research proposals dealing with smart grid technologies, grid modernization and grid cyber security. The key components of the project are the power amplifier units capable of providing up to 20MW of defined power to the research grid. The project has also developed a one of a kind solution to performing fault ride-through testing by combining a reactive divider network and a large power converter into a hybrid method. This unique hybrid method of performing fault ride-through analysis will allow for the research team at the eGRID Center to investigate the complex differences between the alternative methods of performing fault ride-through evaluations and will ultimately further the science behind this testing. With the final goal of being able to perform HIL experiments and demonstration projects, the eGRID team undertook a significant challenge with respect to developing a control system that is capable of communicating with several different pieces of equipment with different communication protocols in real-time. The eGRID team developed a custom fiber optical network that is based upon FPGA

  19. Operating results of 220 MW SKODA saturated steam turbines

    International Nuclear Information System (INIS)

    Drahy, J.

    1992-01-01

    One of the steam turbines produced by the SKODA Works, the 220 MW steam turbine for saturated admission steam of a speed of 3000 r.p.m. is described; it is used in nuclear power plants with 400 MW PWR type reactors. 16 units of 8 turbines each have been in operation in the Jaslovske Bohunice and Dukovany power plants with the total period of operation of all machines exceeding 750,000 hours. The 220 MW steam turbine consists of a two-flow high-pressure section and of two identical two-flow low-pressure sections. The pressure of saturated steam at the inlet of the high-pressure section is 4.32 MPa (the corresponding temperature of the saturation limit being 255 degC) and during the expansion in the high-pressure section it drops to 0.6 MPa; steam moisture reaches 12%. In a separator and two-stage reheater using blend steam, the steam is freed of the moisture and is reheated to a temperature of 217 degC. Some operational problems are discussed, as are the loss of the material of the stator parts of the high-pressure section due to corrosion-erosion wear and corrosion-erosion wear of the guide wheels of the high-pressure section, and measures are presented carried out for the reduction of the corrosion-erosion effects of wet steam. One of the serious problems were the fatigue fractures of the blades of the 4th high-pressure stage, which appeared after 20 000 to 24 000 hours of operation in the dented tee-root. The guide wheels of the 4th stage were substituted by new guide wheels with uniform pitch of the channels and with increased number of guide blades. Also discussed are the dynamic behavior of the low-pressure section of the bridge structure, the operating reliability and the heat off-take for water heating of long-distance heating systems. (Z.S.) 9 figs

  20. Steam generator waterlancing at DNGS

    International Nuclear Information System (INIS)

    Seppala, D.; Malaugh, J.

    1995-01-01

    Darlington Nuclear Generating Station (DNGS) is a four 900 MW Unit nuclear station forming part of the Ontario Hydro East System. There are four identical steam generators(SGs) per reactor unit. The Darlington SGs are vertical heat exchangers with an inverted U-tube bundle in a cylindrical shell. The DNGS Nuclear Plant Life Assurance Group , a department of DNGS Engineering Services have taken a Proactive Approach to ensure long term SG integrity. Instead of waiting until the tubesheets are covered by a substantial and established hard deposit; DNGS plan to clean each steam generator's tubesheet, first half lattice tube support assembly and bottom of the thermal plate every four years. The ten year business plan provides for cleaning and inspection to be conducted on all four SGs in each unit during maintenance outages (currently scheduled for every four years)

  1. Present status and future outlook of nuclear power generation in Japan

    International Nuclear Information System (INIS)

    Kunikazu Aisaka

    1987-01-01

    The structure of energy consumption in Japan is heavily dependent on imported oil, therefore Japan has been making its greatest effort in developing nuclear power among other alternatives of oil. The capacity factor of the nuclear power plants in Japan marked 76% in FY 1986, exceeding 70% level for the past several years. The share of nuclear power is expected to increase steadily in the future. Future scale of the nuclear power generation is projected as 62,000 MW in year 2000 and as 137,000 MW in 2030. Nuclear power is expected to produce 58% of the nation's total power generation in 2030. Under the present circumstances, Janpan is executing a nuclear energy policy based on the following guidelines: 1. Promoting the safety advancement program; 2. Improving LWR technologies; 3. Program on use of plutonium in thermal reactors; 4. Advanced thermal reactors (ATRs); 5. Promotion of FBR development; 6. Nuclear fuel cycle. (Liu)

  2. Investigation of in service inspection for pressure vessel of the 200 MW nuclear heating reactor

    International Nuclear Information System (INIS)

    He Shuyan; Yin Ming; Liu Junjie; Chang Huanjian; Zhou Ningning

    1997-01-01

    The Nuclear District Heating Reactor (NHR) is a new type of reactor. There are some differences in the arrangement of the primary circuit components and in safety features between NHR and PWR or other reactors. In this paper the safety features of the 200 MW NHR are described. The failure probability, the LBB property and the in-service inspection requirement for the 200 MW NHR pressure vessel are also discussed. (author). 16 refs, 6 figs, 4 tabs

  3. Investigation of in service inspection for pressure vessel of the 200 MW nuclear heating reactor

    Energy Technology Data Exchange (ETDEWEB)

    Shuyan, He; Ming, Yin; Junjie, Liu; Huanjian, Chang; Ningning, Zhou [Institute of Nuclear Energy and Technology, Tsingua Univ., Beijing (China)

    1997-09-01

    The Nuclear District Heating Reactor (NHR) is a new type of reactor. There are some differences in the arrangement of the primary circuit components and in safety features between NHR and PWR or other reactors. In this paper the safety features of the 200 MW NHR are described. The failure probability, the LBB property and the in-service inspection requirement for the 200 MW NHR pressure vessel are also discussed. (author). 16 refs, 6 figs, 4 tabs.

  4. Low stress drops observed for aftershocks of the 2011 Mw 5.7 Prague, Oklahoma, earthquake

    Science.gov (United States)

    Sumy, Danielle F.; Neighbors, Corrie J.; Cochran, Elizabeth S.; Keranen, Katie M.

    2017-01-01

    In November 2011, three Mw ≥ 4.8 earthquakes and thousands of aftershocks occurred along the structurally complex Wilzetta fault system near Prague, Oklahoma. Previous studies suggest that wastewater injection induced a Mw 4.8 foreshock, which subsequently triggered a Mw 5.7 mainshock. We examine source properties of aftershocks with a standard Brune-type spectral model and jointly solve for seismic moment (M0), corner frequency (f0), and kappa (κ) with an iterative Gauss-Newton global downhill optimization method. We examine 934 earthquakes with initial moment magnitudes (Mw) between 0.33 and 4.99 based on the pseudospectral acceleration and recover reasonable M0, f0, and κ for 87 earthquakes with Mw 1.83–3.51 determined by spectral fit. We use M0 and f0 to estimate the Brune-type stress drop, assuming a circular fault and shear-wave velocity at the hypocentral depth of the event. Our observations suggest that stress drops range between 0.005 and 4.8 MPa with a median of 0.2 MPa (0.03–26.4 MPa with a median of 1.1 MPa for Madariaga-type), which is significantly lower than typical eastern United States intraplate events (>10 MPa). We find that stress drops correlate weakly with hypocentral depth and magnitude. Additionally, we find the stress drops increase with time after the mainshock, although temporal variation in stress drop is difficult to separate from spatial heterogeneity and changing event locations. The overall low median stress drop suggests that the fault segments may have been primed to fail as a result of high pore fluid pressures, likely related to nearby wastewater injection.

  5. Floating substructure flexibility of large-volume 10MW offshore wind turbine platforms in dynamic calculations

    International Nuclear Information System (INIS)

    Borg, Michael; Hansen, Anders Melchior; Bredmose, Henrik

    2016-01-01

    Designing floating substructures for the next generation of 10MW and larger wind turbines has introduced new challenges in capturing relevant physical effects in dynamic simulation tools. In achieving technically and economically optimal floating substructures, structural flexibility may increase to the extent that it becomes relevant to include in addition to the standard rigid body substructure modes which are typically described through linear radiation-diffraction theory. This paper describes a method for the inclusion of substructural flexibility in aero-hydro-servo-elastic dynamic simulations for large-volume substructures, including wave-structure interactions, to form the basis of deriving sectional loads and stresses within the substructure. The method is applied to a case study to illustrate the implementation and relevance. It is found that the flexible mode is significantly excited in an extreme event, indicating an increase in predicted substructure internal loads. (paper)

  6. Enhanced Control for a Direct-driven Permanent Synchronous Generator Wind-power Generation System with Flywheel Energy Storage Unit Under Unbalanced Grid Fault

    DEFF Research Database (Denmark)

    Yao, Jun; Zhou, Te; Hu, Weihao

    2015-01-01

    This article presents an enhanced control strategy for a direct-driven permanent synchronous generator based wind-power generation system with a flywheel energy storage unit. The behaviors of the direct-driven permanent magnet synchronous generator system with a flywheel energy storage unit under......, the DC-link voltage oscillations can be effectively suppressed during the unbalanced grid fault by controlling the flywheel energy storage unit. Furthermore, a proportional–integral-resonant controller is designed for the flywheel motor to eliminate the oscillations in the DC-link voltage. Finally......, the proposed coordinated control strategy for the direct-driven permanent magnet synchronous generator system with a flywheel energy storage unit has been validated by the simulation results of a 1-MW direct-driven permanent magnet synchronous generator wind power generation system with a flywheel energy...

  7. Steam generation at Rihand STPP Stage 1

    Energy Technology Data Exchange (ETDEWEB)

    1987-12-01

    The steam generation plant at Rihand in India has two 500 MW boilers. The boilers are of the balanced draught, single cell, radiant furnace type, and are controlled automatically. Cochran Thermax shell type auxillary steam boilers are used for preheating air to the main boilers and for heating fuel oil during storage and pumping. Electrostatic precipitators and ash handling plants are provided to keep dust and ash within limits. 2 figs.

  8. Two fixed point theorems on quasi-metric spaces via mw- distances

    Energy Technology Data Exchange (ETDEWEB)

    Alegre, C.

    2017-07-01

    In this paper we prove a Banach-type fixed point theorem and a Kannan-type theorem in the setting of quasi-metric spaces using the notion of mw-distance. These theorems generalize some results that have recently appeared in the literature. (Author)

  9. Preparation of Second Generation Ionic Liquids by Efficient Solvent-Free Alkylation of N-Heterocycles with Chloroalkanes

    Directory of Open Access Journals (Sweden)

    Werner Bonrath

    2008-01-01

    Full Text Available Non-conventional techniques, such as microwave (MW and power ultrasound(US as well as combined MW/US irradiation, have been used to promote one-potsynthesis of second-generation ionic liquids (ILs, cutting down reaction times andimproving yields. However, the use of chloroalkanes in the alkylation of N-heterocyclesrequires more drastic conditions if results are to match those obtained with more reactivealkyl halides. The present paper describes a series of MW- or MW/US-promoted ILpreparations starting from chloroalkanes and classic heterocycles (1-methylimidazole,pyridine and 1-methylpyrrolidine. When reactions were carried out under conventionalheating in an oil bath they required longer reaction times and gave poorer yields. 1H-NMRanalysis and ion-exchange chromatography showed that the present solventless procedureafforded ILs of satisfactory purity. The observed high yields (usually 70-98% isolated,and short reaction times showed that a straightforward access to ILs can be also achievedwith the use of alkyl chlorides, resulting in a considerable reduction of costs.

  10. The Cattenom nuclear power plant, at the service of a safe, competitive and CO2-free power generation in the heart of the Lorraine region

    International Nuclear Information System (INIS)

    2010-01-01

    In less than 20 years, Electricite de France (EDF) has built up a competitive park of 58 nuclear power plants, with no equivalent elsewhere, which represents an installed power of 63.1 GW (85% of EDF's power generation). Inside this nuclear park, the national power generation centre of Cattenom comprises 4 production units of 1300 MW each (5200 MW as a whole). The facility generated 34 billion kWh in 2009, i.e. 8% of the French national power generation. This brochure presents the life of the power plant under various aspects: power generation, safety priority and culture, maintenance investments, respect of the environment, long-term fuel and wastes management, local economical involvement, transparency and public information, key figures and dates. (J.S.)

  11. The Chinon nuclear power plant, at the service of a safe, competitive and CO2-free power generation in the heart of the Centre region

    International Nuclear Information System (INIS)

    2010-01-01

    In less than 20 years, Electricite de France (EDF) has built up a competitive park of 58 nuclear power plants, with no equivalent elsewhere, which represents an installed power of 63.1 GW (85% of EDF's power generation). Inside this nuclear park, the national power generation centre of Chinon comprises 4 production units of 900 MW each (3600 MW as a whole). The facility generated 19.03 billion kWh in 2009, i.e. 4.8% of the French national power generation. This brochure presents the life of the power plant under various aspects: power generation, safety priority and culture, maintenance investments, respect of the environment, long-term fuel and wastes management, local economical involvement, transparency and public information, key figures and dates. (J.S.)

  12. 200 MW S-band traveling wave resonant ring development at IHEP

    Science.gov (United States)

    Zhou, Zu-Sheng; Chi, Yun-Long; Git, Meng-Ping; Pei, Guo-Xi

    2010-03-01

    The resonant-ring is a traveling wave circuit, which is used to produce high peak power with comparatively smaller stored energy. The application to be considered is its use as a high power simulator mainly for testing the klystron ceramic output window, as well as for high power microwave transmission devices. This paper describes the principle of a resonant ring and introduces the structure and property of the newly constructed traveling wave resonant ring at IHEP. Our goal is to produce a 200 MW class resonant ring at 2.856 GHz with a pulse length of 2 μs and repetition rate of 25 Hz. The installation, commissioning and testing of the ring have been completed and a peak power of 200 MW at 3 μs has been achieved. The conditioning results show that all the parameters of the resonant ring reach the design goals.

  13. Multi-Objective Sensitivity Analyses for Power Generation Mix: Malaysia Case Study

    OpenAIRE

    Siti Mariam Mohd Shokri; Nofri Yenita Dahlan; Hasmaini Mohamad

    2017-01-01

    This paper presents an optimization framework to determine long-term optimal generation mix for Malaysia Power Sector using Dynamic Programming (DP) technique. Several new candidate units with a pre-defined MW capacity were included in the model for generation expansion planning from coal, natural gas, hydro and renewable energy (RE). Four objective cases were considered, 1) economic cost, 2) environmental, 3) reliability and 4) multi-objectives that combining the three cases. Results show th...

  14. Improving 200 MW NDHR reactor protection system with GAL devices

    International Nuclear Information System (INIS)

    Shi Mingde; Li Duo; Xie Zhengguo

    1999-01-01

    The emergence of General Array Logic (GAL), a fairly new type of logic devices with the characteristics of user-definable logic functions, have led to a revolutionary change in the design of logical circuits. The improvements of the reactor protection system for the 200 MW nuclear district heating reactor (NDHR) using GAL are covered

  15. Study of energy recovery and power generation from alternative energy source

    Directory of Open Access Journals (Sweden)

    Abdulhakim Amer A. Agll

    2014-11-01

    Full Text Available The energy requirement pattern of world is growing up and developing technology. The available sources, while exhausting and not friendly to the environment, are highly used. Looking at partial supply and different options of environment problems associated with usage, renewable energy sources are getting attention. MSW (Municipal solid waste composition data had been collected from 1997 to 2009, in Benghazi Libya, to evaluate the waste enthalpy. An incinerator with capacity of 47,250 kg/h was confirmed to burn all the quantity of waste generated by the city through the next 15 years. Initial study was performed to investigate energy flow and resource availability to insure sustainable MSW required by the incinerator to work at its maximum capacity during the designated period. The primary purpose of the paper is to discuss the design of Rankin steam cycle for the generation of both power (PG and combined heat power (CHP. In the power generation case, the system was found to be able to generate electrical power of 13.1 MW. Including the combined heat power case, the results showed that the system was able to produce 6.8 million m3/year of desalinated water and generate 11.33 MW of electricity. In conclusion, the CHP designed system has the greatest potential to maximize energy saving, due to the optimal combination of heat production and electricity generation.

  16. A Lightweight, Direct-Drive, Fully Superconducting Generator for Large Wind Turbines

    Energy Technology Data Exchange (ETDEWEB)

    Meinke, Rainer [Advanced Magnet Lab, Palm Bay, FL (United States); Morrison, Darrell [Emerson Inc., St. Louis, MO (United States); Prince, Vernon Gregory [Advanced Magnet Lab, Palm Bay, FL (United States)

    2014-12-31

    The current trend in the offshore wind turbine industry favors direct-drive generators based on permanent magnets, as they allow for a simple and reliable drivetrain without a gearbox. These generators, however, do not scale very well to high power levels beneficial for offshore wind, and their use in wind turbines over 6 MW is questionable in terms of mass and economic feasibility. Moreover, rare earth materials composing the permanent magnets are becoming less available, more costly and potentially unavailable in the foreseeable future. A stated goal of the DOE is a critical materials strategy that pursues the development of substitute materials and technology for rare earth materials to improve supply chain flexibility and meet the needs of the clean energy economy.Therefore, alternative solutions are needed, in terms of both favorable up-scaling and minimizing or eliminating the use of permanent magnets. The generator design presented in this document addresses both these issues with the development of a fully superconducting generator (FSG) with unprecedented high specific torque. A full-scale, 10-MW, 10-rpm generator will weigh less about 150 metric tons, compared to 300 metric tons for an equivalent direct-drive, permanent magnet generator. The developed concept does not use any rare earth materials in its critical drive components, but rather relies on a superconductor composed of mainly magnesium and boron (MgB2), both of which are in abundant supply from multiple global sources.

  17. Thermal Loading and Reliability of 10 MW Multilevel Wind Power Converter at Different Wind Roughness Classes

    DEFF Research Database (Denmark)

    Isidori, Andrea; Rossi, Fabio Mario; Blaabjerg, Frede

    2014-01-01

    This paper focuses on the design, thermal loading, and reliability of a three-level neutral-point-clamped back-to-back full-scale converter for a 10-MW direct-drive wind turbine equipped with a permanent-magnet synchronous generator. The reliability performance of the three-level converter...... is strongly influenced by the thermal behavior of the semiconductor devices and their mission profile which directly affects the lifetime and the cost of the entire converter. Therefore, a simulation platform is developed in a Matlab/Simulink and PLECS simulation environment to analyze the dynamics...... of the system using different kinds of modulation strategies and analyzing the different wind-load conditions that are dependent on roughness classes. This paper shows that the 60 ° discontinuous pulsewidth-modulation strategies allow better thermal performance and increase the estimated lifetime...

  18. Thermal loading and reliability of 10 MW multilevel wind power converter at different wind roughness classes

    DEFF Research Database (Denmark)

    Isidori, Andrea; Rossi, Fabio Mario; Blaabjerg, Frede

    2012-01-01

    This paper focuses on the design, thermal loading and reliability of a three-level Neutral Point Clamped (3-L NPC) back-to-back full scale converter for a 10 MW direct-drive wind turbine equipped with a Permanent Magnet Synchronous Generator (PMSG). The reliability performance of the three......-level converter is strongly influenced by the thermal behaviour of the semiconductor devices and their mission profile which directly affects the lifetime and the cost of the whole converter. Therefore, the simulation platform is developed in Matlab/Simulink and PLECS simulation environment to analyse...... the dynamics of the system using different kinds of modulation strategies and analyzing different wind load conditions dependent on roughness classes. It is concluded that 60° discontinuous PWM modulation strategies show better thermal performance and increase the estimated lifetime of the converter...

  19. Generation of net electric power with a tokamak reactor under foreseeable physical and engineering conditions

    International Nuclear Information System (INIS)

    Hiwatari, R.; Asaoka, Y.; Okano, K.; Yoshida, T.; Tomabechi, K.

    2004-01-01

    This study reveals for the first time the plasma performance required for a tokamak reactor to generate net electric power under foreseeable engineering conditions. It was found that the reference plasma performance of the ITER inductive operation mode with β N = 1.8, HH = 1.0, andf nGW 0.85 had sufficient potential to achieve the electric break-even condition (net electric power P e net = 0MW) under the following engineering conditions: machine major radius 6.5m ≤ R p ≤ 8.5m, the maximum magnetic field on TF coils B tmax = 16 T, thermal efficiency η e 30%, and NBI system efficiency η NBI = 50%. The key parameters used in demonstrating net electric power generation in tokamak reactors are β N and fη GW . ≥ 3.0 is required for P e net ∼ 600MW with fusion power P f ∼ 3000MW. On the other hand, fη GW ≥ 1.0 is inevitable to demonstrate net electric power generation, if high temperatures, such as average temperatures of T ave > 16 keV, cannot be selected for the reactor design. To apply these results to the design of a tokamak reactor for demonstrating net electric power generation, the plasma performance diagrams on the Q vs P f (energy multiplication factor vs fusion power) space for several major radii (i.e. 6.5, 7.5, and 8.5 m) were depicted. From these figures, we see that a design with a major radius R p ∼ 7.5m seems preferable for demonstrating net electric power generation when one aims at early realization of fusion energy. (author)

  20. Energy and exergy analysis of electricity generation from natural gas pressure reducing stations

    International Nuclear Information System (INIS)

    Neseli, Mehmet Alparslan; Ozgener, Onder; Ozgener, Leyla

    2015-01-01

    Highlights: • Forecasting the recoverable energy from natural gas pressure reduction stations. • Electricity generation through pressure reduction stations via turboexpanders. • A thermodynamics analysis of PRS. - Abstract: Electricity generation or power recovery through pressure reduction stations (PRS) for general use has not been realized in Izmir. The main objective of the present study was to do a case study for calculating electricity to be recovered in one natural gas pressure reduction stations in Izmir. It is the first forecasting study to obtain energy from natural gas pressure-reducing stations in Izmir. Energy can be obtained from natural gas PRS with turbo-expanders instead of using throttle valves or regulators from the PRS. The exergy performance of PRS with TE is evaluated in this study. Exergetic efficiencies of the system and components are determined to assess their individual performances. Based upon pressure change and volumetric flow rate, it can be obtained by recovering average estimated installed capacity and annual energy 494.24 kW, 4113.03 MW h, respectively. In terms of estimated installed capacity power and annual energy, the highest level is 764.88 kW, approximately 6365.34 MW h, in Aliaga PRS. Also it can be seen that CO 2 emission factor average value is 295.45 kg/MW h

  1. Magnetohydrodynamic power generation

    International Nuclear Information System (INIS)

    Sheindlin, A.E.; Jackson, W.D.; Brzozowski, W.S.; Rietjens, L.H.Th.

    1979-01-01

    The paper describes research and development in the field of magnetohydrodynamic power generation technology, based on discussions held in the Joint IAEA/UNESCO International Liaison Group on MHD electrical power generation. Research and development programmes on open cycle, closed cycle plasma and liquid-metal MHD are described. Open cycle MHD has now entered the engineering development stage. The paper reviews the results of cycle analyses and economic and environmental evaluations: substantial agreement has been reached on the expected overall performance and necessary component specifications. The achievement in the Soviet Union on the U-25 MHD pilot plant in obtaining full rated electrical power of 20.4 MW is described, as well as long duration testing of the integrated operation of MHD components. Work in the United States on coal-fired MHD generators has shown that, with slagging of the walls, a run time of about one hundred hours at the current density and electric field of a commercial MHD generator has been achieved. Progress obtained in closed cycle plasma and liquid metal MHD is reviewed. Electrical power densities of up to 140 MWe/m 3 and an enthalpy extraction as high as 24 per cent have been achieved in noble gas MHD generator experiments. (Auth.)

  2. Analyses of hypothetical nuclear criticality excursions in 10- and 20-MW freezer/sublimer vessels

    International Nuclear Information System (INIS)

    Haught, C.F.; Jordan, W.C.; Basoglu, B.; Dodds, H.L.; Wilkinson, A.D.

    1995-01-01

    A theoretical model is used to predict the consequences of a postulated hypothetical nuclear criticality excursion in a freezer/sublimer (F/S). Previous work has shown that an intrusion of water into a F/S may result in a critical configuration. A first attempt is made to model the neutronic and thermal-hydraulic phenomena occurring during a criticality excursion involving both uranium hexafluoride (UF 6 ) and uranyl fluoride (UO 2 F 2 ) solution, which is present in the F/S during upset conditions. The model employs point neutronics coupled with simple thermal hydraulics. Reactivity feedback from changes in the properties of the system are included in the model. The excursion is studied in a 10-MW F/S with an initial load of 3,500 kg of 5% weight enriched UF 6 and in a 20-MW F/S with an initial load of 6,800 kg of 2% weight enriched UF 6 . The magnitude of the fission release determined in this work is 5.93 x 10 18 fissions in the 10-MW F/S and 4.21 x 10 18 fissions in the 20-MW F/S. In order to demonstrate the reliability of the techniques used in this work, a limited validation study was conducted by comparing the fission release and peak fission rate determined by this work with experimental results for a limited number of experiments. The agreement between calculations and experiments in the validation study is considered to be satisfactory. The calculational results for the hypothetical accidents in the two F/S vessels appear reasonable

  3. Parametric Analysis of a Two-Shaft Aeroderivate Gas Turbine of 11.86 MW

    Directory of Open Access Journals (Sweden)

    R. Lugo-Leyte

    2015-08-01

    Full Text Available The aeroderivate gas turbines are widely used for power generation in the oil and gas industry. In offshore marine platforms, the aeroderivative gas turbines provide the energy required to drive mechanically compressors, pumps and electric generators. Therefore, the study of the performance of aeroderivate gas turbines based on a parametric analysis is relevant to carry out a diagnostic of the engine, which can lead to operational as well as predictive and/or corrective maintenance actions. This work presents a methodology based on the exergetic analysis to estimate the irrevesibilities and exergetic efficiencies of the main components of a two-shaft aeroderivate gas turbine. The studied engine is the Solar Turbine Mars 100, which is rated to provide 11.86 MW. In this engine, the air is compressed in an axial compressor achieving a pressure ratio of 17.7 relative to ambient conditions and a high pressure turbine inlet temperature of 1220 °C. Even if the thermal efficiency associated to the pressure ratio of 17.7 is 1% lower than the maximum thermal efficiency, the irreversibilities related to this pressure ratio decrease approximately 1 GW with respect to irreversibilities of the optimal pressure ratio for the thermal efficiency. In addition, this paper contributes to develop a mathematical model to estimate the high turbine inlet temperature as well as the pressure ratio of the low and high pressure turbines.

  4. Efficient generation of 509 nm light by sum-frequency mixing between two tapered diode lasers

    DEFF Research Database (Denmark)

    Tawfieq, Mahmoud; Jensen, Ole Bjarlin; Hansen, Anders Kragh

    2015-01-01

    We demonstrate a concept for visible laser sources based on sum-frequency generation of beam com- bined tapered diode lasers. In this specific case, a 1.7 W sum-frequency generated green laser at 509 nm is obtained, by frequency adding of 6.17 W from a 978 nm tapered diode laser with 8.06 W from...... a 1063 nm tapered diode laser, inside a periodically poled MgO doped lithium niobate crystal. This corresponds to an optical to optical conversion ef fi ciency of 12.1%. As an example of potential applica- tions, the generated nearly diffraction-limited green light is used for pumping a Ti:sapphire laser......, thus demonstrating good beam quality and power stability. The maximum output powers achieved when pumping the Ti:sapphire laser are 226 mW (CW) and 185 mW (mode-locked) at 1.7 W green pump power. The optical spectrum emitted by the mode-locked Ti:sapphire laser shows a spectral width of about 54 nm...

  5. Plasma generation using high-power millimeter-wave beam and its application for thrust generation

    International Nuclear Information System (INIS)

    Oda, Yasuhisa; Komurasaki, Kimiya; Takahashi, Koji; Kasugai, Atsushi; Sakamoto, Keishi

    2006-01-01

    Propagation of an ionization front in the beam channel was observed after plasma was generated using a 170 GHz millimeter-wave beam in the atmosphere. The propagation velocity of the ionization front was found to be supersonic when the millimeter-wave power density was greater than 75 kW cm -2 . The momentum coupling coefficient C m , a ratio of the propulsive impulse to the input energy, was measured using conical and cylindrical thruster models. A C m value greater than 350 N MW -1 was recorded when the ionization front propagated with supersonic velocity

  6. The progress of test and study for steam dryer in vertical steam generator

    International Nuclear Information System (INIS)

    Ding Xunshen

    1993-01-01

    Constructions, tests and test results are reviewed for three types of steam generator dryer that are concentric vertical corrugated separator, centrifugal conic separator and chevron separator. The last type is considered as the best one in comparison, which has been applied to Qinshan 300 MW steam generator. A number of pertinent remarks to draining scheme, hydraulic loss reduction, and conduct of test are given based on experiences

  7. Aeroelastic Optimization of a 10 MW Wind Turbine Blade with Active Trailing Edge Flaps

    DEFF Research Database (Denmark)

    Barlas, Athanasios; Tibaldi, Carlo; Zahle, Frederik

    2016-01-01

    This article presents the aeroelastic optimization of a 10MW wind turbine ‘smart blade’ equipped with active trailing edge flaps. The multi-disciplinary wind turbine analysis and optimization tool HawtOpt2 is utilized, which is based on the open-source framework Open-MDAO. The tool interfaces...... to several state-of-the art simulation codes, allowing for a wide variety of problem formulations and combinations of models. A simultaneous aerodynamic and structural optimization of a 10 MW wind turbine rotor is carried out with respect to material layups and outer shape. Active trailing edge flaps...

  8. Operational performance of generator condition monitors

    International Nuclear Information System (INIS)

    Braun, J.M.; Brown, G.

    1990-01-01

    This paper reports on the generator condition monitor (GCM) developed in an attempt to detect overheating inside large turbine generators. As part of a broader study on rotating machinery diagnostics, generator condition monitors were evaluated under field conditions in a 550 MW turbogenerator. Small 100 W resistors coated with insulating paints and varnishes were mounted inside the generator to simulate insulation overheating. The GCM responded very rapidly to an overheating event, typically within two minutes, even for hot spots as small s 10 cm 2 . Similarly the aerosols produced on overheating were found extremely short lived, decaying within two to three minutes after overheating was discontinued. Use of heated ion chambers was found to desensitize the GCM regardless of the nature of the overheated insulation and in some cases would altogether prevent the GCM from reaching the 50% pre-set alarm level commonly used on GCMs

  9. Integrated operation and management system for a 700MW combined cycle power plant

    Energy Technology Data Exchange (ETDEWEB)

    Shiroumaru, I. (Yanai Power Plant Construction Office, Chugoku Electric Power Co., Inc., 1575-5 Yanai-Miyamoto-Shiohama, Yanai-shi, Yamaguchi-ken (JP)); Iwamiya, T. (Omika Works, Hitachi, Ltd., 5-2-1 Omika-cho, Hitachi-shi, Ibaraki-ken (JP)); Fukai, M. (Hitachi Works, Hitachi, Ltd., 3-1-1 Saiwai-cho, Hitachi-shi, Ibaraki-ken (JP))

    1992-03-01

    Yanai Power Plant of the Chugoku Electric Power Co., Inc. (Yamaguchi Pref., Japan) is in the process of constructing a 1400MW state-of-the-art combined cycle power plant. The first phase, a 350MW power plant, started operation on a commercial basis in November, 1990. This power plant has achieved high efficiency and high operability, major features of a combined cycle power plant. The integrated operation and management system of the power plant takes care of operation, maintenance, control of general business, etc., and was built using the latest computer and digital control and communication technologies. This paper reports that it is expected that this system will enhance efficient operation and management for the power plant.

  10. PLC control of 50 MW klystron modulators

    International Nuclear Information System (INIS)

    Shang Lei; Liu Gongfa; Chen Liping; Lu Yeming; Hong Jun; Zhang Yi; Zhao Feng

    2004-01-01

    Upgrade project of the 50 MW klystron modulators of Hefei Light Source (HLS) was firstly introduced. PLC control system of modulators was employed to replace the old control and monitor system, which was based on relay logic circuit and manual operation method. the PLC system becomes a sub system of the new EPICS control system of HLS. Constant-current, switch-mode and high voltage power supplies were adopted to replace the old 50 Hz power supplies. The technology of modulators was improved and operation was more reliable. The design method, hardware and software of PLC control of modulators were described and the performance was presented. (authors)

  11. 1.5 MW RF Load for ITER

    International Nuclear Information System (INIS)

    Ives, Robert Lawrence; Marsden, David; Collins, George; Karimov, Rasul; Mizuhara, Max; Neilson, Jeffrey

    2016-01-01

    Calabazas Creek Research, Inc. developed a 1.5 MW RF load for the ITER fusion research facility currently under construction in France. This program leveraged technology developed in two previous SBIR programs that successfully developed high power RF loads for fusion research applications. This program specifically focused on modifications required by revised technical performance, materials, and assembly specification for ITER. This program implemented an innovative approach to actively distribute the RF power inside the load to avoid excessive heating or arcing associated with constructive interference. The new design implemented materials and assembly changes required to meet specifications. Critical components were built and successfully tested during the program.

  12. 1.5 MW RF Load for ITER

    Energy Technology Data Exchange (ETDEWEB)

    Ives, Robert Lawrence [Calabazas Creek Research, Inc., San Mateo, CA (United States); Marsden, David [Calabazas Creek Research, Inc., San Mateo, CA (United States); Collins, George [Calabazas Creek Research, Inc., San Mateo, CA (United States); Karimov, Rasul [Calabazas Creek Research, Inc., San Mateo, CA (United States); Mizuhara, Max [Calabazas Creek Research, Inc., San Mateo, CA (United States); Neilson, Jeffrey [Lexam Research, Redwood City, CA (United States)

    2016-09-01

    Calabazas Creek Research, Inc. developed a 1.5 MW RF load for the ITER fusion research facility currently under construction in France. This program leveraged technology developed in two previous SBIR programs that successfully developed high power RF loads for fusion research applications. This program specifically focused on modifications required by revised technical performance, materials, and assembly specification for ITER. This program implemented an innovative approach to actively distribute the RF power inside the load to avoid excessive heating or arcing associated with constructive interference. The new design implemented materials and assembly changes required to meet specifications. Critical components were built and successfully tested during the program.

  13. Provincial panel: addressing emerging energy constraints and new strategies to meet future generation demand

    International Nuclear Information System (INIS)

    Clarkson, J.

    2006-01-01

    This paper addresses emerging energy constraints and new strategies to meet future generation demand in the Province of Manitoba. The focus is to reduce reliance on energy sources that emit greenhouse gases such as petroleum, natural gas and coal, and increase clean and green electricity. The current plan is to double hydro generation, achieve 1000 MW wind power and utilize bio energy

  14. The isolated ˜680 km deep 30 May 2015 MW 7.9 Ogasawara (Bonin) Islands earthquake

    Science.gov (United States)

    Ye, Lingling; Lay, Thorne; Zhan, Zhongwen; Kanamori, Hiroo; Hao, Jin-Lai

    2016-01-01

    Deep-focus earthquakes, located in very high-pressure conditions 300 to 700 km below the Earth's surface within sinking slabs of relatively cold oceanic lithosphere, are mysterious phenomena. The largest recorded deep-focus earthquake (MW 7.9) in the Izu-Bonin slab struck on 30 May 2015 beneath the Ogasawara (Bonin) Islands, isolated from prior seismicity by over 100 km in depth, and followed by only a few small aftershocks. Globally, this is the deepest (680 km centroid depth) event with MW ≥ 7.8 in the seismological record. Seismicity indicates along-strike contortion of the Izu-Bonin slab, with horizontal flattening near a depth of 550 km in the Izu region and rapid steepening to near-vertical toward the south above the location of the 2015 event. This event was exceptionally well-recorded by seismic stations around the world, allowing detailed constraints to be placed on the source process. Analyses of a large global data set of P, SH and pP seismic phases using short-period back-projection, subevent directivity, and broadband finite-fault inversion indicate that the mainshock ruptured a shallowly-dipping fault plane with patchy slip that spread over a distance of ∼40 km with a multi-stage expansion rate (∼ 5 + km /s down-dip initially, ∼3 km/s up-dip later). During the 17 s total rupture duration the radiated energy was ∼ 3.3 ×1016 J and the stress drop was ∼38 MPa. The radiation efficiency is moderate (0.34), intermediate to that of the 1994 Bolivia and 2013 Sea of Okhotsk MW 8.3 deep earthquakes, indicating that source processes of very large deep earthquakes sample a wide range of behavior from dissipative, more viscous failure to very brittle failure. The isolated occurrence of the event, much deeper than the apparently thermally-bounded distribution of Bonin-slab seismicity above 600 km depth, suggests that localized stress concentration associated with the pronounced deformation of the Izu-Bonin slab and proximity to the 660-km phase

  15. Reliability-based inspection planning of 20MW offshore wind turbine jacket

    DEFF Research Database (Denmark)

    Gintautas, Tomas; Sørensen, John Dalsgaard

    2018-01-01

    This paper presents the application of a risk and reliability based inspection planning framework (RBI) for the InnWind 20MW reference wind turbine jacket sub-structure. A detailed fracture mechanics based fatigue crack growth model is developed and used as basis to derive optimal inspection plans...

  16. Proposition of primary methods for nitrogen oxides emissions reduction at coal-fired 200 MW power unit (Yugoslavia)

    International Nuclear Information System (INIS)

    Repic, B.; Mladenovic, R.; Crnomarkovic, N.

    1997-01-01

    The combustion of coal is followed by increased pollution of the environment with toxic products. Together with the generation of other pollutants, the emission of nitrogen oxides (NO x ) represents, due to its high toxicity, a great environmental risk. Appropriate measures must be taken for lowering NO x emission, both on new facilities and those already in operation. Basic technologies (primary reduction methods) of several generations, developed until now and used in practice, are presented in the paper. The technologies applicable on domestic facilities and adjusted to domestic coals have been given particular consideration. Proposition of primary methods for NO x emission reduction at coal-fired 200 MW power unit at TPS 'Nikola Tesla' is analyzed. The following methods have been considered in detail: flue gases recirculation, multi-stage combustion, low-NO x burners, additional over-fire air, multi-stage air intake into the furnace, staged fuel injection, grinding fineness increase, etc. Considerations were performed according to existing constructive characteristics of the furnace and the burners, and characteristics of used fuels, i. e. lignites from Kolubara pit. (Author)

  17. Radiation monitoring data on the power-up test of HTTR. Results up to 20 MW operation

    International Nuclear Information System (INIS)

    Ashikagaya, Yoshinobu; Nakazawa, Takashi; Yoshino, Toshiaki; Yasu, Katsuji

    2002-01-01

    The High Temperature Engineering Test Reactor (HTTR) have completed the Power-up test of 9 MW (the single and parallel loaded operation) in the rated operation mode. After that the Power-up test in the rated operation mode and the high-temperature test operation mode with a thermal output of 20 MW (the single and parallel loaded operation) were performed between January 16, 2001 and June 10, 2001. This report describes the radiation monitoring data carried out during the HTTR Power-up test in the rated operation mode and the high-temperature test operation mode with a thermal output of 20 MW. The followings were concluded from these radiation monitoring data. The monitoring of radioactive gaseous effluents and the radiation protection for the works will be easy to do and the exposure dose of the workers will be kept the low level. (author)

  18. Waste generation comparison: Coal-fired versus nuclear power plants

    International Nuclear Information System (INIS)

    LaGuardia, T.S.

    1998-01-01

    Low-level radioactive waste generation and disposal attract a great deal of attention whenever the nuclear industry is scrutinized by concerned parties, be it the media, the public, or political interests. It is therefore important to the nuclear industry that this issue be put into perspective relative to other current forms of energy production. Most of the country's fossil-fueled power comes from coal-fired plants, with oil and gas as other fuel sources. Most of the generated waste also comes from coal plants. This paper, therefore, compares waste quantities generated by a typical (1150-MW(electric)) pressurized water reactor (PWR) to that of a comparably sized coal-fired power plant

  19. Biogas generation potential by anaerobic digestion for sustainable energy development in India

    International Nuclear Information System (INIS)

    Rao, P. Venkateswara; Baral, Saroj S.; Dey, Ranjan; Mutnuri, Srikanth

    2010-01-01

    The potential of biogas generation from anaerobic digestion of different waste biomass in India has been studied. Renewable energy from biomass is one of the most efficient and effective options among the various other alternative sources of energy currently available. The anaerobic digestion of biomass requires less capital investment and per unit production cost as compared to other renewable energy sources such as hydro, solar and wind. Further, renewable energy from biomass is available as a domestic resource in the rural areas, which is not subject to world price fluctuations or the supply uncertainties as of imported and conventional fuels. In India, energy demand from various sectors is increased substantially and the energy supply is not in pace with the demand which resulted in a deficit of 11,436 MW which is equivalent to 12.6% of peak demand in 2006. The total installed capacity of bioenergy generation till 2007 from solid biomass and waste to energy is about 1227 MW against a potential of 25,700 MW. The bioenergy potential from municipal solid waste, crop residue and agricultural waste, wastewater sludge, animal manure, industrial waste which includes distilleries, dairy plants, pulp and paper, poultry, slaughter houses, sugar industries is estimated. The total potential of biogas from all the above sources excluding wastewater has been estimated to be 40,734 Mm 3 /year. (author)

  20. Development in fiscal 1999 of technology commercializing photovoltaic power generation system. Research and development of power generation application system and peripheral technologies (Survey and research on evaluation of photovoltaic power generation); 1999 nendo taiyoko hatsuden system jitsuyoka gijutsu kaihatsu seika hokokusho. Taiyoko hatsuden riyo system shuhen gijutsu no kenkyu kaihatsu (taiyoko hatsuden hyoka no chosa kenkyu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    With an objective of evaluating the contribution to the global environment of utilization of photovoltaic power generation, discussions were given on evaluation of photovoltaic system life cycle, evaluation of contribution to environment, and total evaluation. This paper summarizes the achievements in fiscal 1999. In evaluating the PV system life cycle, the roof-integrated modules using the thin film CdTe cells were selected as the evaluation object to estimate the energy payback time (EPT) and the CO2 emission unit consumption rate. In case of annual production of 10 MW, the EPT is 1.8 years and the CO2 emission unit consumption rate is 13 (g-C/kWh), which were found largely reducible by expanding the annual production size. For the environmental contribution evaluation which focuses on CO2 emission suppression effect as the discussion object, discussions are being given on the introduction scenario needed for the analysis. In the total evaluation, the direct employment effect assumed in Japan was discussed on production, distribution sales, installation, maintenance control and dismantling of photovoltaic generation system for residential use. The discussion showed the effect of about 7 persons per year per MW in production size of 100 MW. (NEDO)

  1. Superhigh-power of Regotron-type generator for linear accelerator with high mean currents

    International Nuclear Information System (INIS)

    Murin, B.P.; Durkin, A.P.; Shlygin, O.Yu.; Shumakov, I.V.

    1991-01-01

    Theoretical principles and construction scheme of new-type super-power microwave relativistic electron-beam (REB) generator (Regotron) are discussed. Unlike other types of REB-generator, Regotron includes distributed power take-off system. To increase device efficiency the autophasing-principle is used. Such principles of device construction eliminate output power generator limitations. Theoretical basis of general generator construction principles is proposed; the results of mathematical simulations are presented; the different versions of construction scheme are discussed. It is shown that Regotron efficiency can reach 70-80% at output power levels up to 10 MW CW

  2. TITAN - a 9 MW, 179 bar pressurised water rig

    International Nuclear Information System (INIS)

    Mogford, D.J.; Lee, D.H.

    1987-02-01

    The report describes the TITAN rig built at Winfrith for thermal hydraulic experiments with water at up to 179 bar pressure. A power supply of 9 MW is available. The report describes three typical experiments that show the versatility of the rig. The first is a 25 rod pressurized water reactor fuel bundle critical heat flux experiment, the second is a parallel channel evaporator test and the third is a model jet pump test. (author)

  3. Optical generation of radio-frequency power

    International Nuclear Information System (INIS)

    Hietala, V.M.; Vawter, G.A.; Brennan, T.M.; Hammons, B.E.; Meyer, W.J.

    1994-11-01

    An optical technique for high-power radio-frequency (RF) signal generation is described. The technique uses a unique photodetector based on a traveling-wave design driven by an appropriately modulated light source. The traveling-wave photodetector (TWPD) exhibits simultaneously a theoretical quantum efficiency approaching 100 % and a very large electrical bandwidth. Additionally, it is capable of dissipating the high-power levels required for the RF generation technique. The modulated light source is formed by either the beating together of two lasers or by the direct modulation of a light source. A system example is given which predicts RF power levels of 100's of mW's at millimeter wave frequencies with a theoretical ''wall-plug'' efficiency approaching 34%

  4. Dysprosium-doped PbGa2S4 laser generating at 4.3 μm directly pumped by 1.7 μm laser diode.

    Science.gov (United States)

    Jelínková, Helena; Doroshenko, Maxim E; Jelínek, Michal; Sulc, Jan; Osiko, Vyacheslav V; Badikov, Valerii V; Badikov, Dmitrii V

    2013-08-15

    In this Letter, we demonstrate the pulsed and CW operation of the Dy:PbGa(2)S(4) laser directly pumped by the 1.7 μm laser diode. In the pulsed regime (pulse duration 5 ms; repetition rate 20 Hz), the maximum mean output power of 9.5 mW was obtained with the slope efficiency of 9.3% with respect to the absorbed pump power. The generated wavelength was 4.32 μm, and the laser beam cross section was approximately Gaussian on both axes. Stable CW laser generation was also successfully obtained with the maximum output power of 67 mW and the slope efficiency of 8%. Depopulation of the lower laser level by 1.7 μm pump radiation absorption followed by 1.3 μm upconversion fluorescence was demonstrated. These results show the possibility of construction of the compact diode-pumped solid-state pulsed or CW laser generating at 4.3 μm in the power level of tens mW operating at room temperature.

  5. A 22 MW pilot plant with an ammonia bottoming cycle is being tested by Electricite de France

    International Nuclear Information System (INIS)

    Fleury, J.; Bellot, C.

    1989-01-01

    EDF's DER has built a 22 MW ammonia bottoming cycle pilot power plant in Gennevilliers near Paris. This construction marks a turning point in the development of bottoming cycles which was undertaken at EDF in 1970. These cycles could be used in powerful PWR plants. The key feature of this type of plant is its appreciable capacity gain when the temperature of the heat sink drops. Thus, with a heat sink of the dry cooling tower type, low air temperatures in winter can be turned to use to produce more energy when demand is at its highest. At the same time, with dry cooling towers, a tiresome constraint vanishes since the plant location choice does no longer depend on the existence of a water reservoir in the vicinity of the plant. The construction of the pilot plant Cybiam began in 1980. Its steam turbine-generator set was coupled to the French network in March 1986 and its ammonia turbine-generator set in December 1986. The full load was attained on June 4th 1987. The main problems met during its commissioning are described in this paper as well as the first test results. From the economic point of view, the money value of the extra power generated during cold spells is assessed

  6. Impact of externalities on various power generation technologies

    International Nuclear Information System (INIS)

    Rubow, L.

    2008-01-01

    This analysis develops and compares the cost of electricity of the envisioned nuclear power plant at Belene1 (with approximately 2000 MW of installed capacity), with the cost of electricity from alternate generation sources, with a view toward the Bulgarian economy. The logical alternate generating sources are: New Lignite fueled Thermal Electric Power Plants (TEPPs) New Coal fueled TEPPs (based on imported coal), and New Natural gas fueled TEPPs. The developed economic cost of electricity considers the internalized costs such as capital, fuel and operating costs, as well as the external costs, such as health and environmental impacts, to the extent possible

  7. Experimental results and recent developments on the EU 2 MW 170 GHz coaxial cavity gyrotron for ITER

    Directory of Open Access Journals (Sweden)

    Thumm M. K.

    2012-09-01

    Full Text Available The European Gyrotron Consortium (EGYC is responsible for developing one set of 170 GHz mm-wave sources, in support of Europe’s contribution to ITER. The original plan of targeting a 2 MW coaxial gyrotron is currently under discussion, in view of essential delays and damages. This paper reports on the latest results and plans with regard to the two 2 MW gyrotron prototypes, the industrial prototype at CRPP’s CW test stand and a modular pre-prototype at KIT. The industrial prototype was delivered to CRPP end of September 2011 and reached an output power of 2 MW at an efficiency of 45 % and with good RF beam pattern, in only four days of short pulse RF test. These results validated all design changes made in reaction to the results of the experiments in 2008. On the fifth experimental day, an internal absorber broke, terminating any further experiment with this tube. In parallel, design and experimental activities at KIT went on, in particular featuring reduced stray radiation down to 4% of the RF power. Next years’ plans for the 2 MW modular pre-prototype foresee a stepwise increase of pulse length.

  8. Feasibility study of a 1-MW pulsed spallation source

    International Nuclear Information System (INIS)

    Cho, Y.; Chae, Y.C.; Crosbie, E.

    1995-01-01

    A feasibility study of a 1-MW pulsed spallation source based on a rapidly cycling proton synchrotron (RCS) has been completed. The facility consists of a 400-MeV HP - linac, a 30-Hz RCS that accelerates the 400-MeV beam to 2 GeV, and two neutron-generating target stations. The design time-averaged current of the accelerator system is 0.5 mA, or 1.04x1014 protons per pulse. The linac system consists of an H - ion source, a 2-MeV RFQ, a 70-MeV DTL and a 330-MeV CCL. Transverse phase space painting to achieve a Kapchinskij-Vladimirskij (K-V) distribution of the injected particles in the RCS is accomplished by charge exchange injection and programming of the closed orbit during injection. The synchrotron lattice uses FODO cells of ∼90 degrees phase advance. Dispersion-free straight sections are obtained by using a missing magnet scheme. Synchrotron magnets are powered by a dual-frequency resonant circuit that excites the magnets at a 20-Hz rate and de-excites them at a 60-Hz rate, resulting in an effective rate of 30 Hz, and reducing the required peak rf voltage by 1/3. A key feature, of the design of this accelerator system is that beam losses are from injection to extraction, reducing activation to levels consistent with hands-on maintenance. Details of the study are presented

  9. Pre-feasibility study of 80mw onshore wind farm

    International Nuclear Information System (INIS)

    Almas, M.S.

    2014-01-01

    This paper discusses a pre-feasibility study of 80MW onshore wind farm in the KPK (Khyber Pakhtunkhwa) province previously known as NWFP (North West Frontier) Province of Pakistan. The realistic data of wind speed is collected from Laboratory of Meteorology and Climatology (University of the Punjab) to study the feasibility of wind farm. Detailed analysis of wind turbines from four different manufacturers is carried out together with justifications of selecting a particular wind turbine. Issues related to site selection, wind farm civil foundation, recommendations for a particular choice of tower along with environmental effects are presented. Wind data analysis is carried out by using WINDROSE PRO software to determine the resultant direction of wind at the selected site for wind farm layout. The wind distribution at hub height of the wind turbine is calculated and is used to compute annual power production by the wind farm using power curves of the wind turbine. Electrical network integration issues of wind farm to the external grid are studied and the optimum point of connection is proposed. Finally, economic analysis of the whole wind farm project depending upon the LCC (Life Cycle Cost Analysis) is presented and the feasibility of the project from the investor's point of view is identified. The study concludes that the cost per kilowatt hour of electricity generated by this wind power plant will be 10.4 PKR/kWh and the payback period for the whole project is about 11.2 years. (author)

  10. Modeling and Simulation of Offshore Wind Power Platform for 5 MW Baseline NREL Turbine

    Science.gov (United States)

    Roni Sahroni, Taufik

    2015-01-01

    This paper presents the modeling and simulation of offshore wind power platform for oil and gas companies. Wind energy has become the fastest growing renewable energy in the world and major gains in terms of energy generation are achievable when turbines are moved offshore. The objective of this project is to propose new design of an offshore wind power platform. Offshore wind turbine (OWT) is composed of three main structures comprising the rotor/blades, the tower nacelle, and the supporting structure. The modeling analysis was focused on the nacelle and supporting structure. The completed final design was analyzed using finite element modeling tool ANSYS to obtain the structure's response towards loading conditions and to ensure it complies with guidelines laid out by classification authority Det Norske Veritas. As a result, a new model of the offshore wind power platform for 5 MW Baseline NREL turbine was proposed. PMID:26550605

  11. DIII-D electron cyclotron heating 2 MW upgrade project. Final report for the period FY89 through FY97

    International Nuclear Information System (INIS)

    Callis, R.W.

    1997-08-01

    The 2 MW, 110 GHz ECH system was based on the General Atomics Proposal to the Department of Energy: DIII-D Fusion Research Program Vol. I Technical, and Vol. II Cost (GACP-72-166, July 1987 and revised). This proposal was reviewed in August 1987 by a senior technical review committee, who recommended to vigorously pursue increasing the ECH power to 6 MW. The realization of the higher frequency and power ECH on DIII-D was recognized by the committee to be important, not only for the DIII-D program, but also for future devices and the whole ECH area. Subsequently, an engineering cost and schedule review was conducted by DOE-OAK which confirmed the GA costs and schedules and recommended proceeding directly to 10 MW. However, because of budgetary constraints, in the April 1988 Field Task Proposal submission, GA proposed a phased ECH approach, Phase I being 2 MW and Phase II increasing the power to 10 MW. After review, DOE instructed GA to initiate the prototype 2 MW, 110 GHz program. The contract to procure four 500 kW, 110 GHz, 10 s gyrotrons from Varian Associates was initiated in April 1989 with final delivery by November 1990. Because of difficulties in spreading the energy of the electron beam over the collector area, the testing of the first gyrotron delayed its delivery until February 1991. The second gyrotron was able to operate for 1 s at 500 kW and 2 s at 300 kW, but failed when the cavity suffered thermal damage

  12. A strong-motion hot spot of the 2016 Meinong, Taiwan, earthquake (Mw = 6.4

    Directory of Open Access Journals (Sweden)

    Hiroo Kanamori

    2017-01-01

    Full Text Available Despite a moderate magnitude, Mw = 6.4, the 5 February 2016 Meinong, Taiwan, earthquake caused significant damage in Tainan City and the surrounding areas. Several seismograms display an impulsive S-wave velocity pulse with an amplitude of about 1 m s-1, which is similar to large S-wave pulses recorded for the past several larger damaging earthquakes, such as the 1995 Kobe, Japan, earthquake (Mw = 6.9 and the 1994 Northridge, California, earthquake (Mw = 6.7. The observed PGV in the Tainan area is about 10 times larger than the median PGV of Mw = 6.4 crustal earthquakes in Taiwan. We investigate the cause of the localized strong ground motions. The peak-to-peak ground-motion displacement at the basin sites near Tainan is about 35 times larger than that at a mountain site with a similar epicentral distance. At some frequency bands (0.9 - 1.1 Hz, the amplitude ratio is as large as 200. Using the focal mechanism of this earthquake, typical “soft” and “hard” crustal structures, and directivity inferred from the observed waveforms and the slip distribution, we show that the combined effect yields an amplitude ratio of 17 to 34. The larger amplitude ratios at higher frequency bands can be probably due to the effects of complex 3-D basin structures. The result indicates that even from a moderate event, if these effects simultaneously work together toward amplifying ground motions, the extremely large ground motions as observed in Tainan can occur. Such occurrences should be taken into consideration in hazard mitigation measures in the place with frequent moderate earthquakes.

  13. The Fessenheim nuclear power plant, at the service of a safe, competitive and CO2-free power generation in the heart of the Alsace region

    International Nuclear Information System (INIS)

    2010-01-01

    In less than 20 years, Electricite de France (EDF) has built up a competitive park of 58 nuclear power plants, with no equivalent elsewhere, which represents an installed power of 63.1 GW (85% of EDF's power generation). Inside this nuclear park, the national power generation centre of Fessenheim comprises two production units of 900 MW each (1800 MW as a whole). The facility generated 8.7 billion kWh in 2009, i.e. 70% of the energy consumed in the Alsace region. This brochure presents the life of the power plant under various aspects: power generation, safety priority and culture, maintenance investments, respect of the environment, long-term fuel and wastes management, local economical involvement, transparency and public information, key figures and dates. (J.S.)

  14. Acoustic assessment report for Toronto Hydro Energy Services Inc. Ashbridge's Bay power generation facility

    International Nuclear Information System (INIS)

    Bernard, F.; Shinbin, N.

    2010-04-01

    This acoustic assessment report was conducted to determine the potential noise impacts of a biogas cogeneration plant that will be located on a street in a primarily industrial area of Toronto, Ontario. The facility will be comprised of seven 1.416 MW biogas-fired reciprocating engine generators and a single flare. The report presented results obtained from noise level calculations and noise modelling studies of the on-site equipment at the planned facility. The cogeneration plant will utilize biogas produced in existing digesters to generate electricity and hot water. The biogas will be produced by anaerobic digestion from municipal sewage waste at an adjacent facility. It is expected that the facility will generate 9.912 MW of electricity from the generators. Heat resulting from the biogas combustion process is recovered from engine and exhaust flue gases by heat exchangers. The facility will operate continuously. Significant noise sources at the facility include generator exhaust gas stacks; air intake points; building ventilation fans; and roof-top heat dump radiators. Sound power levels determined for each of the noise sources were based upon worst-case operating scenarios. Results of the assessment indicated that the facility is in compliance with all Ministry of the Environment (MOE) requirements. 5 refs., 10 tabs., 4 figs.

  15. Inverted Steam Generators for Sodium Cooled Fast Reactors

    International Nuclear Information System (INIS)

    Matal, Oldřich; Šimo, Tomáš; Matal, Oldřich Jr.

    2013-01-01

    Conclusions: Two inverted steam generators of the Czech industry provenience have still been in successful operation with no water into sodium leaks at BOR 60 (RIAR Dimitrovgrad, Russian Federation). Micromodular inverted steam generator (MMISG) since 1981 and modular inverted steam generator (MISG) since 1991. In the framework of the CP ESFR project predesign studies of 100 MW (thermal) ISG modules were performed with the consideration of MMISG and MISG design, operational and safety benefits and experience. Development of material and technology for sodium heated steam generators components reflecting contemporary domestic industrial conditions in the Czech Republic was restarted in the years 2003 to 2004 and supported in the years 2008 to 2011 by the European CP ESFR project and by the Ministry of Industry and Trade of the Czech Republic

  16. Cost of electricity from small scale co-generation of electricity and heat

    Energy Technology Data Exchange (ETDEWEB)

    Kjellstroem, Bjoern

    2012-07-15

    There is an increasing interest in Sweden for using also small heat loads for cogeneration of electricity and heat. Increased use of small CHP-plants with heat supply capacities from a few 100 kW(h) up to 10 MW(h) cannot change the structure of the electricity supply system significantly, but could give an important contribution of 2 - 6 TWh(e) annually. The objective of this study was to clarify under what conditions electricity can be generated in small wood fired CHP-plants in Sweden at costs that can compete with those for plants using fossil fuels or nuclear energy. The capacity range studied was 2 - 10 MW(h). The results should facilitate decisions about the meaningfulness of considering CHP as an option when new heat supply systems for small communities or sawmills are planned. At the price for green certificates in Sweden, 250 - 300 SEK/MWh(e), generation costs in small wood fired CHP-plants should be below about 775 SEK/MWh(e) to compete with new nuclear power plants and below about 925 SEK/MWh(e) to compete with generation using fossil fuels.

  17. Coulomb Stress Change and Seismic Hazard of Rift Zones in Southern Tibet after the 2015 Mw7.8 Nepal Earthquake and Its Mw7.3 Aftershock

    Science.gov (United States)

    Dai, Z.; Zha, X.; Lu, Z.

    2015-12-01

    In southern Tibet (30~34N, 80~95E), many north-trending rifts, such as Yadong-Gulu and Lunggar rifts, are characterized by internally drained graben or half-graben basins bounded by active normal faults. Some developed rifts have become a portion of important transportation lines in Tibet, China. Since 1976, eighty-seven >Mw5.0 earthquakes have happened in the rift regions, and fifty-five events have normal faulting focal mechanisms according to the GCMT catalog. These rifts and normal faults are associated with both the EW-trending extension of the southern Tibet and the convergence between Indian and Tibet. The 2015 Mw7.8 Nepal great earthquake and its Mw7.3 aftershock occurred at the main Himalayan Thrust zone and caused tremendous damages in Kathmandu region. Those earthquakes will lead to significant viscoelastic deformation and stress changes in the southern Tibet in the future. To evaluate the seismic hazard in the active rift regions in southern Tibet, we modeled the slip distribution of the 2015 Nepal great earthquakes using the InSAR displacement field from the ALOS-2 satellite SAR data, and calculated the Coulomb failure stress (CFS) on these active normal faults in the rift zones. Because the estimated CFS depends on the geometrical parameters of receiver faults, it is necessary to get the accurate fault parameters in the rift zones. Some historical earthquakes have been studied using the field data, teleseismic data and InSAR observations, but results are in not agreement with each other. In this study, we revaluated the geometrical parameters of seismogenic faults occurred in the rift zones using some high-quality coseismic InSAR observations and teleseismic body-wave data. Finally, we will evaluate the seismic hazard in the rift zones according to the value of the estimated CFS and aftershock distribution.

  18. Design considerations in achieving 1 MW CW operation with a whispering-gallery-mode gyrotron

    International Nuclear Information System (INIS)

    Felch, K.; Feinstein, J.; Hess, C.; Huey, H.; Jongewaard, E.; Jory, H.; Neilson, J.; Pendleton, R.; Pirkle, D.; Zitelli, L.

    1989-09-01

    Varian is developing high-power, CW gyrotrons at frequencies in the range 100 GHz to 150 GHz, for use in electron cyclotron heating applications. Early test vehicles have utilized a TE 15,2,1 interaction cavity, have achieved short-pulse power levels of 820 kW and average power levels of 80 kW at 140 GHz. Present tests are aimed at reaching 400 kW under CW operating conditions and up to 1 MW for short pulse durations. Work is also underway on modifications to the present design that will enable power levels of up to 1 MW CW to be achieved. 7 refs., 2 figs

  19. Rationale for a spallation neutron source target system test facility at the 1-MW Long-Pulse Spallation Source

    International Nuclear Information System (INIS)

    Sommer, W.F.

    1995-12-01

    The conceptual design study for a 1-MW Long-Pulse Spallation Source at the Los Alamos Neutron Science Center has shown the feasibility of including a spallation neutron test facility at a relatively low cost. This document presents a rationale for developing such a test bed. Currently, neutron scattering facilities operate at a maximum power of 0.2 MW. Proposed new designs call for power levels as high as 10 MW, and future transmutation activities may require as much as 200 MW. A test bed will allow assessment of target neutronics; thermal hydraulics; remote handling; mechanical structure; corrosion in aqueous, non-aqueous, liquid metal, and molten salt systems; thermal shock on systems and system components; and materials for target systems. Reliable data in these areas are crucial to the safe and reliable operation of new high-power facilities. These tests will provide data useful not only to spallation neutron sources proposed or under development, but also to other projects in accelerator-driven transmutation technologies such as the production of tritium

  20. Economic analysis of power generation from floating solar chimney power plant

    International Nuclear Information System (INIS)

    Zhou, Xinping; Yang, Jiakuan; Xiao, Bo; Wang, Fen

    2009-01-01

    Solar chimney thermal power technology that has a long life span is a promising large-scale solar power generating technology. This paper performs economic analysis of power generation from floating solar chimney power plant (FSCPP) by analyzing cash flows during the whole service period of a 100 MW plant. Cash flows are influenced by many factors including investment, operation and maintenance cost, life span, payback period, inflation rate, minimum attractive rate of return, non-returnable subsidy rate, interest rate of loans, sale price of electricity, income tax rate and whether additional revenue generated by carbon credits is included or not. Financial incentives and additional revenue generated by carbon credits can accelerate the development of the FSCPP. Sensitivity analysis to examine the effects of the factors on cash flows of a 100 MW FSCPP is performed in detail. The results show that the minimum price for obtaining minimum attractive rate of return (MARR) of 8% reaches 0.83 yuan (kWh) -1 under financial incentives including loans at a low interest rate of 2% and free income tax. Comparisons of economics of the FSCPP and reinforced concrete solar chimney power plant or solar photovoltaic plant are also performed by analyzing their cash flows. It is concluded that FSCPP is in reality more economical than reinforced concrete solar chimney power plant (RCSCPP) or solar photovoltaic plant (SPVP) with the same power capacity. (author)

  1. Development of steam generator manufacturing technology

    International Nuclear Information System (INIS)

    Grant, J.A.

    1979-01-01

    In 1968 Babcock and Wilcox (Operations) Ltd., received an order from the CEGB to design, manufacture, install and commission 16 Steam Generators for 2 x 660 Mw (e) Advanced Gas Cooled Reactor Power Station at Hartlepool. This order was followed in 1970 by a similar order for the Heysham Power Station. The design and manufacture of the Steam Generators represented a major advance in technology and the paper discusses the methods by which a manufacturing facility was developed, by the Production Division of Babcock, to produce components to a quality, complexity and accuracy unique in the U.K. commercial boilermaking industry. The discussion includes a brief design background, a description of the Steam Generators and a view of the Production Division background. This is followed by a description of the organisation of the technological development and a consideration of the results. (author)

  2. Design and manufacture of a large superconducting homopolar motor (and status of superconducting a.c. generator)

    International Nuclear Information System (INIS)

    Appleton, A.D.

    1983-01-01

    This paper describes the design and manufacture of a large superconducting motor which, in the present time of financial restraints, is continuing at least to the point of having a completed cryostat with its superconducting winding operating with a dedicated helium refrigeration plant. Comments are also made on the superconducting a.c. generator project, although a final decision on the rating of a prototype and the approval of the funding has not yet been made, the selected rating is expected to be between 200 MW and 600 MW

  3. Wellhead to wire utilization of remote gas resources

    International Nuclear Information System (INIS)

    Harris, R.A.; Hines, T.L.

    1998-01-01

    Utilization of remote gas resources in developing countries continues to offer challenges and opportunities to producers and contractors. The Aguaytia Gas and Power Project is an example where perseverance and creativity resulted in successful utilization of natural gas resources in the Ucayali Region of Central Peru, a country which previously had no natural gas infrastructure. The resource for the project was first discovered by Mobil in 1961, and remained undeveloped for over thirty years due to lack of infrastructure and markets. Maple Gas won a competitively bid contract to develop the Aguaytia gas reserves in March of 1993. The challenges facing Maple Gas were to develop downstream markets for the gas, execute contracts with Perupetro S.A. and other Peruvian government entities, raise financing for the project, and solicit and execute engineering procurement and construction (EPC) contracts for the execution of the project. The key to development of the downstream markets was the decision to generate electric power and transmit the power over the Andes to the main electrical grid along the coast of Peru. Supplemental revenue could be generated by gas sales to a small regional power plant and extraction of LPG and natural gasoline for consumption in the Peruvian market. Three separate lump sum contracts were awarded to Asea Brown Boveri (ABB) companies for the gas project, power project and transmission project. Each project presented its unique challenges, but the commonalities were the accelerated schedule, high rainfall in a prolonged wet season and severe logistics due to lack of infrastructure in the remote region. This presentation focuses on how the gas plant contractor, ABB Randall, working in harmony with the developer, Maple Gas, tackled the challenges to monetize a remote gas resource

  4. The Paluel nuclear power plant, at the service of a safe, competitive and CO2-free power generation in the heart of the Haute Normandie region

    International Nuclear Information System (INIS)

    2010-01-01

    In less than 20 years, Electricite de France (EDF) has built up a competitive park of 58 nuclear power plants, with no equivalent elsewhere, which represents an installed power of 63.1 GW (85% of EDF's power generation). Inside this nuclear park, the national power generation centre of Paluel comprises 4 production units of 1300 MW each (5200 MW as a whole). The facility generated 29.5 billion kWh in 2009, i.e. about 7% of the French national power generation and 35% of the energy produced in the Normandie region. This brochure presents the life of the power plant under various aspects: power generation, safety priority and culture, maintenance investments, respect of the environment, long-term fuel and wastes management, local economical involvement, transparency and public information, key figures and dates. (J.S.)

  5. The Bugey nuclear power plant, at the service of a safe, competitive and CO2-free power generation in the heart of the Rhone-Alpes region

    International Nuclear Information System (INIS)

    2010-01-01

    In less than 20 years, Electricite de France (EDF) has built up a competitive park of 58 nuclear power plants, with no equivalent elsewhere, which represents an installed power of 63.1 GW (85% of EDF's power generation). Inside this nuclear park, the national power generation centre of Bugey comprises 4 production units of 900 MW each (3600 MW as a whole). The facility generated 20.87 billion kWh in 2009, i.e. 5% of the French national power generation and 40% of the energy consumed in the Rhone-Alpes region. This brochure presents the life of the power plant under various aspects: power generation, safety priority and culture, maintenance investments, respect of the environment, long-term fuel and wastes management, local economical involvement, transparency and public information, key figures and dates. (J.S.)

  6. The 12 September 2007, Mw=7.9 Pagai-Sipora Earthquake, an Impulsive Rupture on the Central Sumatra Megathrust.

    Science.gov (United States)

    Sladena, A.; Konca, A.; Avouac, J.; Sieh, K.; Galtezka, J.; Fang, P.; Genrich, J.; Ji, C.; Natawidjaja, D.; Bock, Y.

    2007-12-01

    On 12 September 2007, at 23:40 UT, a large Mw=7.9 earthquake occurred offshore central Sumatra, 12 hours after a Mw=8.4 rupture that initiated about 200 km to the southeast. We analyze this event using teleseismic P and SH waveforms, together with GPS co-seismic displacements measured at cGPS stations from the the SuGAr network. The SuGAr network includes 5 receivers on the outer arc islands of Pagai and Sipora, in addition to stations on Sumatra mainland therefore providing an excellent coverage of the rupture area. Moreover, the high sampling rate of the stations (1 to 15 s sampling for most stations), allows to properly identify the respective contributions of the Mw=8.4 and major nearby aftershocks. Both seismic waveforms and the geodetic data indicate a moment release of about 1.1e21 N.m due to the rupture of two distinct asperities about 130 km apart along the subduction interface. The seismic waveforms require the first subevent to be extremely impulsive, with a short rise time of a few seconds at most, and a highly peaked slip distribution close to the epicenter. The geodetic and seismic data were inverted jointly to derive some kinematic model of the source that is found to reconcile well the two datasets. The first subevent is located near the eastern border of South Pagai Island with a maximum slip of 5.5 m released in less than a few seconds. The slip distribution due to that event abuts with the slip distribution due to the Mw=8.4 event. The second patch is located 130 km to the northwest, along the north- eastern coast of Sipora Island, with a maximum slip of 3.5 m. The rupture velocity is estimated to be about 2 km/s. Both the 2007 Mw=8.4 and Mw=7.9 events occurred within the estimated rupture area of the Mw>8.6 historical earthquake of 1833, a well defined patch that had remained locked during the interseismic period. A same portion of the megathrust can rupture in different ways.

  7. Multi-MW Spallation Neutron Sources: Current Challenges and Future Prospects, 16th, 17th and 18th March 2009 in Bilbao (Spain)

    International Nuclear Information System (INIS)

    2009-01-01

    The strategy of building a multi MW, accelerator based spallation neutron source as the next generation neutron facility for Europe has been validated by the successful commissioning and operation of the SNS in the US (now operating close to 1 MW beam power) and the JPARC facility in Japan. However, since the original baseline design of ESS was completed in 2002, the underlying technology has advanced and some considerable experience has been gathered from these new facilities. Hence as Europe prepares for the construction of ESS, the time is ripe to learn from ongoing experience and define the development areas which would allow the ESS to take the most advantage from recent advances in technology while maintaining a reliable, low risk, design. The goal of the workshop, organized by the ESS Bilbao consortium, was to assess the current challenges facing multi-MW spallation sources and, taking into account synergies with other international projects of a similar nature, outline a road map for a collaborative Research and Development program that would enable Europe to meet these challenges for the timely construction of ESS. The full reports and recommendations from the various working groups are provided in the following pages. They lay the foundation for a road map for a collaborative development program which will enable the ESS to take full advantage of the relevant expertise which is distributed across various facilities and countries within Europe to produce a truly European facility at the forefront of the technology. This report is a witness to the willingness of a great many people to share their experiences and knowledge in an open and cooperative environment. (Author)

  8. Condition Monitoring of the SSE Generation Fleet

    Science.gov (United States)

    Twiddle, J.; Muthuraman, S.; Connolly, N.

    2012-05-01

    SSE (previously known as Scottish and Southern Energy) operates a diverse portfolio of generation plant, including coal, gas and renewable plant with a total generation capacity of 11,375MW (Sept 2011). In recent years a group of specialists dedicated to providing condition monitoring services has been established at the Equipment Performance Centre (EPC) based at Knottingley, West Yorkshire. We aim to illustrate the role of the EPC and the methods used for monitoring the generation fleet with the objective of maintaining asset integrity, reducing risk of plant failure and unplanned outages and describe the challenges which have been overcome in establishing the EPC. This paper describes methods including vibration and process data analysis, model-based techniques and on-site testing used for monitoring of generation plant, including gas turbines, steam turbines, generators and steam raising plant. These condition monitoring processes utilise available data, adding value to the business, by bringing services in-house and capturing knowledge of plant operation for the benefit of the whole fleet.

  9. Biblis 1,300 MW unit B in operation for thirty years

    International Nuclear Information System (INIS)

    Lauer, H.

    2006-01-01

    Over the past thirty years, unit B of the Biblis nuclear power station has contributed towards safe, reliable and non-polluting electricity generation. Unit B was the first 1,300 MW unit in the world confirming the good experience accumulated in the construction and operation of plants this size. It laid the foundation for the advanced development of nuclear power plants up to the convoy line. The good availability this plant has achieved in its operating cycles proves the mature state of technology and the high level of qualification and motivation of the power plant staff and the personnel of external firms contracted to work for Biblis. Biblis B has served as a reference plant in German nuclear safety research, demonstrating that units this size can be operated safely. Unit B is also living proof of the possibility to raise nuclear power plants built in the seventies to the current state of the art by implementing the appropriate backfitting and modernization measures. Today, Biblis B is operated at a safety level clearly higher than that to be achieved for new plants internationally. This is also evident from comparison with the guiding values for the safety of new facilities as published by the International Atomic Energy Agency (IAEA). (orig.)

  10. Electric power generation and LNG evaporation with the aid of gas turbines within a closed-cycle process. [In German

    Energy Technology Data Exchange (ETDEWEB)

    Weber, D

    1978-01-01

    LNG, after being pumped to customary pipeline pressure, has a high working potential which can be technically utilized. Thus, in a modern large-size terminal, a power potential in the order of magnitude of several hundred MW is available. In the course of rising power prices the question becomes important if this potential continues to be wasted or if conversion to electric power is economical. In the proposed process the working fluid of a gas turbine plant with a closed circuit is cooled to -140/sup 0/C with LNG before entering the compressor and heated to +720/sup 0/C before entering the turbine by means of external heat gained by burning natural gas. With a 1 million m/sup 3//h throughput of LNG in its normal state, 237 MW of electric power can be generated with 53% efficiency with this simple circuit, which can be further developed. In a combination of closed gas turbine and diesel generator, almost 289 MW of electric power can be produced per 1 million m/sup 3//h LNG with an efficiency of 60%.

  11. Hydrogen generator characteristics for storage of renewably-generated energy

    International Nuclear Information System (INIS)

    Kotowicz, Janusz; Bartela, Łukasz; Węcel, Daniel; Dubiel, Klaudia

    2017-01-01

    The paper presents a methodology for determining the efficiency of a hydrogen generator taking the power requirements of its auxiliary systems into account. Authors present results of laboratory experiments conducted on a hydrogen generator containing a PEM water electrolyzer for a wide range of device loads. On the basis of measurements, the efficiency characteristics of electrolyzers were determined, including that of an entire hydrogen generator using a monitored power supply for its auxiliary devices. Based on the results of the experimental tests, the authors have proposed generalized characteristics of hydrogen generator efficiency. These characteristics were used for analyses of a Power-to-Gas system cooperating with a 40 MW wind farm with a known yearly power distribution. It was assumed that nightly-produced hydrogen is injected into the natural gas transmission system. An algorithm for determining the thermodynamic and economic characteristics of a Power-to-Gas installation is proposed. These characteristics were determined as a function of the degree of storage of the energy produced in a Renewable Energy Sources (RES) installation, defined as the ratio of the amount of electricity directed to storage to the annual amount of electricity generated in the RES installation. Depending on the degree of storage, several quantities were determined. - Highlights: • The efficiency characteristics of PEM electrolyzer are determined. • Generalized characteristics of hydrogen generator efficiency are proposed. • Method of choice of electrolyser nominal power for Power-to-Gas system was proposed. • Development of Power-to-Gas systems requires implementation of support mechanisms.

  12. How generation choices are influenced by costs, risks and externalities: the generation planning process in Ontario, Canada

    International Nuclear Information System (INIS)

    Marriage, E.A.; Rogers, M.S.

    1994-01-01

    Ontario Hydro is responsible for generating, supplying and delivering electricity throughout Ontario, Canada. Installed generation capacity of 32 GW consists of 20% hydro-electric (6.4 GW), 35% fossil (11.3 GW) and 40% nuclear (14.2 GW). Ontario Hydro' s planning process has evolved significantly since its decision in the late 1970's to build the 4-unit 3500 MW Darlington Nuclear Station. The emergence of environmental issues as a primary consideration, increased awareness of financial and regulatory risks, and uncertainty about the load forecast and the impact of demand management programs on the load have all contributed to the changed planning process. This paper discusses Ontario Hydro's responses to these changes such as: increased public involvement in the decision-making process; the use of a broader range of options including demand management and non-utility generation; optimizing the use of the existing system; more complete risk analyses of generation options, and recent attempts to incorporate externalities into the decision-making process. (authors). 3 figs

  13. Emergency planning and emergency drill for a 5 MW district heating reactor

    International Nuclear Information System (INIS)

    Shi Zhongqi; Wu Zhongwang; Hu Jingzhong; Feng Yuying; Li Zhongsan; Dong Shiyuan

    1991-01-01

    The authors describes the main contents of the emergency planning for a 5 MW nuclear district heating reactor and some considerations for the planning's making, and presents the situation on implementing emergency preparedness and an emergency drill that has been carried out

  14. Steam turbine generators for Sizewell 'B' nuclear power station

    International Nuclear Information System (INIS)

    Hesketh, J.A.; Muscroft, J.

    1990-01-01

    The thermodynamic cycle of the modern 3000 r/min steam turbine as applied at Sizewell 'B' is presented. Review is made of the factors affecting thermal efficiency including the special nature of the wet steam cycle and the use of moisture separation and steam reheating. Consideration is given to the optimization of the machine and cycle parameters, including particular attention to reheating and to the provision of feedheating, in order to achieve a high overall level of performance. A modular design approach has made available a family of machines suitable for the output range 600-1300 MW. The constructional features of the 630 MW Sizewell 'B' turbine generators from this range are described in detail. The importance of service experience with wet steam turbines and its influence on the design of modern turbines for pressurized water reactor (PWR) applications is discussed. (author)

  15. Design of the Los Alamos generator installation

    International Nuclear Information System (INIS)

    Boenig, H.J.; Schillig, J.B.; Rogers, J.D.; Huddleston, S.W.; Konkel, H.E.; Rosev, B.J.

    1989-01-01

    A 1430 MVA synchronous generator from a cancelled nuclear power plant is being installed at Los Alamos to be used as the pulsed power generator for the Confinement Physics Research Facility. The generator is mounted on a spring foundation to avoid dynamic forces from being transmitted to the substructure and the ground. A 6 MW load-commutated inverter drive will accelerate the machine from standstill to the maximum operating speed of 1800 rpm and from 1260 rpm to 1800 rpm between load pulses. The generator cooling method is being changed from hydrogen to air cooling. A current limiting fuse, with a fuse clearing current of 80 kA, will protect the generator output against short circuit currents. Changes in the excitation system are described. A status report of the installation and an approximate schedule for completing the installation are presented. The paper also addresses results of special studies and tests undertaken to evaluate the condition of the generator and to predict the behavior of some critical mechanical generator components under pulsed loading conditions. 1 ref., 4 figs., 2 tabs

  16. Increasing the flexibility of base-load generating units in operation on fossil fuel

    Energy Technology Data Exchange (ETDEWEB)

    Girshfel' d, V Ya; Khanaev, V A; Volkova, E D; Gorelov, V A; Gershenkroi, M L

    1979-01-01

    Increasing the flexibility of base-load generating units operating on fossil fuel by modifying them is a necessary measure. The highest economic effect is attained with modification of gas- and oil-fired generating units in the Western United Power Systems of the European part of the SPSS. On the basis of available experience, 150- and 200-MW units can be extensively used to regulate the power in the European part of the SPSS through putting them into reserve for the hours of the load dip at night. The change under favorable conditions of 150- and 200-MW units operating on coal to a district-heating operating mode does not reduce the possibilities for flexible operation of these units because it is possible greatly to unload the turbines while the minimum load level of the pulverized fuel fired boiler is retained through transferring a part of the heat load to the desuperheater. It is necessary to accumulate and analyze experience with operation of generating units (especially of supercritical units) with regular shutdowns and starts of groups of units and to solve the problems of modification of generating units, with differentiation with respect to types of fuel and to the united power supply system.

  17. Efficient third harmonic generation of a CW-fibered 1.5 µm laser diode

    Science.gov (United States)

    Philippe, Charles; Chea, Erick; Nishida, Yoshiki; du Burck, Frédéric; Acef, Ouali

    2016-10-01

    We report on frequency tripling of CW-Telecom laser diode using two cascaded PPLN ridge nonlinear crystals, both used in single-pass configuration. All optical components used for this development are fibered, leading to a very compact and easy to use optical setup. We have generated up to 290 mW optical power in the green range, from 800 mW only of infrared power around 1.54 µm. This result corresponds to an optical conversion efficiency P 3 ω / P ω > 36 %. To our knowledge, this is best value ever demonstrated up today for a CW-third harmonic generation in single-pass configuration. This frequency tripling experimental setup was tested over more than 2 years of continuous operation, without any interruption. The compactness and the reliability of our device make it very suitable as a transportable optical oscillator. In particular, it paves the way for embedded applications thanks to the high level of long-term stability of the optical alignments.

  18. A Mw 6.3 earthquake scenario in the city of Nice (southeast France): ground motion simulations

    Science.gov (United States)

    Salichon, Jérome; Kohrs-Sansorny, Carine; Bertrand, Etienne; Courboulex, Françoise

    2010-07-01

    The southern Alps-Ligurian basin junction is one of the most seismically active zone of the western Europe. A constant microseismicity and moderate size events (3.5 case of an offshore Mw 6.3 earthquake located at the place where two moderate size events (Mw 4.5) occurred recently and where a morphotectonic feature has been detected by a bathymetric survey. We used a stochastic empirical Green’s functions (EGFs) summation method to produce a population of realistic accelerograms on rock and soil sites in the city of Nice. The ground motion simulations are calibrated on a rock site with a set of ground motion prediction equations (GMPEs) in order to estimate a reasonable stress-drop ratio between the February 25th, 2001, Mw 4.5, event taken as an EGF and the target earthquake. Our results show that the combination of the GMPEs and EGF techniques is an interesting tool for site-specific strong ground motion estimation.

  19. Power Generation Strategy Development in Croatia

    International Nuclear Information System (INIS)

    Curkovic, A.; Androcec, I.; Tarnik, T.

    2010-01-01

    Electricity generation as an economic sector contributes to the national GDP through increasing investments and exports. In the period from 2000 to 2008 the annual growth rate of final electricity demand was 3,8% which was higher than for any other energy form. Almost 1200 MW of thermal power plants will go out of system due to lifetime (more than 30 years). Energy Strategy is a basic document of the Energy Act with the purpose to define energy policy and future plans for energy development of the Republic of Croatia till 2020. Based on the adopted strategy the Government will create the Energy Strategy Implementation Programme for the four-year period. Croatian's energy development should be based on best available technologies as well as on energy-related, economic and environmental assessment of all available energy options. Energy strategy of Croatia (NN 130/09) puts up next goals: 300 MW hydro power plants (bigger than 10 MW), 1200 MW gas-fired thermal power plants (including 300 MW of cogeneration), 1200 MW of coal-fired thermal power plants, and 35% of renewable (including hydro). The market, i.e. a competitive generation, is the driving force in the construction of new power plants. The main stimulus for the construction is the possibility of definite return of invested capital as well as earning of reasonable profit for investors. Choose of location, environmental impact and competitiveness are main criteria for decision making. Technological and financial terms of new power plant is under influence of the law of supply and demand, so short marginal costs are in the first view - power plant life is at least 30 years - how to deal with this conditions, who will invest in long-term projects with condition of short pay-back period. Climate change and greenhouse gas emissions have become a priority development issue. The main challenge is a long-term development of economy with decreased emission of carbon dioxide. Kyoto protocol obligations, Copenhagen Accord

  20. The Blayais nuclear power plant, at the service of a safe, competitive and CO2-free power generation in the heart of the Aquitaine region

    International Nuclear Information System (INIS)

    2010-01-01

    In less than 20 years, Electricite de France (EDF) has built up a competitive park of 58 nuclear power plants, with no equivalent elsewhere, which represents an installed power of 63.1 GW (85% of EDF's power generation). Inside this nuclear park, the national power generation centre of Blayais comprises 4 production units of 900 MW each (3600 MW as a whole). The facility generated 21.3 billion kWh in 2009, i.e. 5.5% of the French national power generation and 1.2 times the energy consumed in the Aquitaine region. This brochure presents the life of the power plant under various aspects: power generation, safety priority and culture, maintenance investments, respect of the environment, long-term fuel and wastes management, local economical involvement, transparency and public information, key figures and dates. (J.S.)

  1. Delineation of a wellhead protection zone and determination of flowpaths from potential groundwater contaminant source areas at Camp Ripley, Little Falls, Minnesota.

    Energy Technology Data Exchange (ETDEWEB)

    Quinn, J. J.; Environmental Science Division

    2006-12-22

    Groundwater at Camp Ripley, Minnesota, is recharged both on post and off site and discharged to rivers, wetlands, and pumping wells. The subsurface geologic materials have a wide range of permeabilities and are arranged in a complex fashion as a result of the region's multiple glacial advances. Correlation of individual glacial geologic units is difficult, even between nearby boreholes, because of the heterogeneities in the subsurface. This report documents the creation of a numerical model of groundwater flow for Camp Ripley and hydrologically related areas to the west and southwest. The model relies on a hydrogeological conceptual model built on the findings of a University of Minnesota-Duluth drilling and sampling program conducted in 2001. Because of the site's stratigraphic complexity, a geostatistical approach was taken to handle the uncertainty of the subsurface correlation. The U.S. Geological Survey's MODFLOW code was used to create the steady-state model, which includes input data from a variety of sources and is calibrated to water levels in monitoring wells across much of the site. This model was used for several applications. Wellhead protection zones were delineated for on-site production wells H, L, and N. The zones were determined on the basis of a probabilistic assessment of the groundwater captured by these wells; the assessment, in turn, had been based on multiple realizations of the study area's stratigraphy and groundwater flowfield. An additional application of the model was for estimating flowpaths and times of travel for groundwater at Camp Ripley's range areas and waste management facilities.

  2. Structural capacity assessment of WWER-1000 MW reactor containment. Progress report

    International Nuclear Information System (INIS)

    Jordanov, M.

    1999-01-01

    The objective of the project is to provide assessment of the structural behaviour and safety capacity of the WWER-1000 MW Reactor Building Containment at Kozloduy NPP under critical combination of loads according to the current international requirements. The analysis is focused on a realistic assessment of the Containment taking into account the non-linear shell behaviour of the pre-stressed reinforced concrete structure. Previous assessments of the status of pre stressing cables pointed out that the efficiency of the Containment as a final defence barrier for internal and external events depends on their reliability. Due to this, the experimental data obtained from embedded sensors (gauges) at pre-stressed shell structure is to be compared with the results from analytical investigations. The reliability of the WWER-1000 MW accident prevention system is under evaluation in the project. The Soviet standard design WWER-1000 MW type units installed in Kozloduy NPP were originally designed for a Safe Shutdown Earthquake (SSE) with a peak ground acceleration (PGA) of 0.1g. The new site seismicity studies revealed that the seismic hazard for the site significantly exceeds the originally estimated and a Review Level Earthquake (RLE) anchored to PGA=0.20g was proposed for re-assessment of the structures and equipment at Kozloduy NPP. The scope of the study is a re-assessment of the Containment structure under critical combination of loads according to the current safety and reliability requirements, including comparison between the Russian design requirements and the international regulations. Additionally, an investigation of the pre-stressing technology and the annual control of the cables' pre-stressing of the Containment is to be made. The crane influence on the dynamic behaviour of the Containment will be done as well as a study of the integrity of the Containment as a final defence barrier

  3. The technology of the bearings used in the nuclear power generation system turbine generator units

    International Nuclear Information System (INIS)

    Vialettes, J.M.; Rossato, M.

    1997-01-01

    A bearing consists of all the stationary part which allow the relative motion in rotation or in translation, of a shaft line. Inside the bearing there is a journal bearing with a metallic anti-friction coating (the babbitt metal). The high power turbine generator unit rotors are supported by smooth transversal journal bearings fed with oil which fills the empty space and runs along the shaft. The technologies used for the bearings and the thrust bearings of the turbine generator units and the various shaft lines of the French CP0/CP1- and CP2/1300 MW-type nuclear power plants are described. The experience feedback is then discussed in terms of the dynamics of the shaft line, i.e. vibrational problems, the influence of the alignment and the babbitt metal incidents. (author)

  4. 2000 MW(t) HTGR-DC-GT Modesto Site dry cooled model 346 concice

    International Nuclear Information System (INIS)

    1979-07-01

    Construction information is presented for a 800 MW(e) HTGR power reactor. The information is itemized for each reactor component or system and incudes quantity, labor hours, labor cost, material cost, and total costs

  5. Estimating seismic moment magnitude (Mw) of tremor bursts in northern Cascadia: Implications for the “seismic efficiency” of episodic tremor and slip

    Science.gov (United States)

    Kao, Honn; Wang, Kelin; Dragert, Herb; Kao, Jason Y.; Rogers, Garry

    2010-10-01

    We develop a method to estimate the seismic moments of deep non-volcanic tremor bursts observed in northern Cascadia. For each tremor burst, the maximum amplitudes at individual stations within a time window ±5 s around the predicted arrivals of the S phase are measured and compared to the maximum S amplitudes measured from synthetic seismograms. The proposed method is thoroughly calibrated using 464 local earthquakes and the results show excellent consistency between the reported ML and the estimated Mw. We apply the method to northern Cascadia tremors and infer that most bursts have Mw˜1.0-1.7. The corresponding b value appears to be 1, consistent with that of ordinary earthquakes but over a narrower Mw range. Comparison of cumulative tremor Mw and the Mw estimated from the accompanying slow slip suggests that the “seismic efficiency” of the Episodic Tremor and Slip (ETS) is of the order of 0.1% or less.

  6. The TFTR 40 MW neutral beam injection system and DT operations

    International Nuclear Information System (INIS)

    Stevenson, T.; O'Connor, T.; Garzotto, V.

    1995-01-01

    Since December 1993, TFTR has performed DT experiments using tritium fuel provided mainly by neutral beam injection. Significant alpha particle populations and reactor-like conditions have been achieved at the plasma core, and fusion output power has risen to a record 10.7 MW using a record 40 MW NB heating. Tritium neutral beams have injected into over 480 DT plasmas and greater than 500 kCi have been processed through the neutral beam gas, cryo, and vacuum systems. Beam tritium injections, as well as tritium feedstock delivery and disposal, have now become part of routine operations. Shot reliability with tritium is about 90% and is comparable to deuterium shot reliability. This paper describes the neutral beam DT experience including the preparations, modifications, and operating techniques that led to this high level of success, as well as the critical differences in beam operations encountered during DT operations. Also, the neutral beam maintenance and repair history during DT operations, the corrective actions taken, and procedures developed for handling tritium contaminated components are discussed in the context of supporting a continuous DT program

  7. On-Chip electric power generation system from sound of portable music plyers and smartphones towerd portable uTAS

    NARCIS (Netherlands)

    Naito, T.; Kaji, N.; le Gac, Severine; Tokeshi, M.; van den Berg, Albert; Baba, Y.; Fujii, T.; Hibara, A.; Takeuchi, S.; Fukuba, T.

    2012-01-01

    This paper demonstrates electric generation from sound to minimize and integrate microfluidic systems for point of care testing or in-situ analysis. In this work, 5.4 volts and 50 mW DC was generated from sound through an earphone cable, which is a versatile system and able to actuate small size and

  8. Mod-5A wind turbine generator program design report. Volume 3: Final design and system description, book 1

    Science.gov (United States)

    1984-01-01

    The design, development and analysis of the 7.3 MW MOD-5A wind turbine generator is documented. Volume 3, book 1 describes the performance and characteristics of the MOD-5A wind turbine generator in its final configuration. Each subsystem - the rotor, drivetrain, nacelle, tower and foundation is described in detail.

  9. Design of a 60 MW CFB gasification system (CGAS) for Uganda : utilising rice husks as input fuel

    Energy Technology Data Exchange (ETDEWEB)

    Amanyire, F. [Gulu Univ., Gulu (Uganda). Dept. of Biosystems Engineering; Bagamuhunda, D.B. [Uganda Industrial Research Inst., Technology Development Centre, Kampala (Uganda)

    2010-07-01

    In Uganda, biomass comprises more than 95 per cent of the total energy supply. Agricultural residues are a major source of energy that can be converted into producer gas in biomass gasifiers. The high poverty levels in Uganda can be attributed in part to the fact that more than 90 per cent of the population does not have access to electricity due to limited and unreliable electricity produced in the country. A circulating fluidized bed (CFB) gasification system was designed in this study in order to generate a system for the effective use of agricultural wastes for energy production. Rice husks were used as the feedstock for a power output of 60 MW. The gasification system was designed using ERGUN CFB software with available theoretical and experimental data. The design comprises a reactor subsystem, air distribution plate, cyclone, air inlet and fuel feeding systems. The reactor is 10 m high and has a fuel flow rate of 8.1 kg/s. The inlet air flow rate is 11 m{sup 3}/s and the fluidization velocity is 0.9 m/s, with a pressure drop in the bed of 1.5 kPa. The inlet gas velocity of the reactor is 25.2 m/s with about 99 per cent cyclone efficiency and less than 1 kPa pressure drop in cyclone. It has a cold gas efficiency of 50 per cent. It was concluded that the gasifier can produce 60 MW of electricity from locally available and environmentally sound biomass energy sources.

  10. EURISOL-DS Multi-MW Target Neutronic Calculations for the Baseline Configuration of the Multi-MW Target

    CERN Document Server

    Herrera-Martínez, A

    2006-01-01

    This document summarises the study performed within the Task #2 of the European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study (EURISOL DS) [1] to design the Multi-MW proton-to-neutron converter. A preliminary study [2] was carried out in order to understand the nature of the interactions taking place in the proton-to-neutron converter and their impact on the design of the facility. Namely, the target dimensions and material composition, type of incident particle, its energy and the beam profile were analysed in the aforementioned technical note, and their optimum values were suggested in the conclusions. The present work is based on the results of the previous study and uses the same methodology, namely Monte Carlo simulations with FLUKA [3]. This note describes the performance of a Hg target design and addresses more detailed issues, such as the composition of the fission target and use of a neutron reflector. It also attempts to integrate those components together and estimate the wh...

  11. 77 FR 58367 - Exelon Generation Company, LLC; Notice of Application Tendered for Filing With the Commission and...

    Science.gov (United States)

    2012-09-20

    ... Avenue, Washington, DC 20001, at (202) 347-7500 or email at [email protected] . i. FERC... integral with the dam and is composed of 13 turbine-generator units, draft tubes, and transformer bays. The... Kaplan-type hydraulic turbines. Units 1, 3, 4, 6 and 7 have 47.7-MW generators; Units 2 and 5 have 36.0...

  12. Mod-5A wind turbine generator program design report. Volume 2: Conceptual and preliminary design, book 2

    Science.gov (United States)

    1984-01-01

    The design, development and analysis of the 7.3 MW MOD-5A wind tunnel generator is documented. There are four volumes. In Volume 2, book 2 the requirements and criteria for the design are presented. The development tests, which determined or characterized many of the materials and components of the wind turbine generator, are described.

  13. Modeling and Simulation of Offshore Wind Power Platform for 5 MW Baseline NREL Turbine

    Directory of Open Access Journals (Sweden)

    Taufik Roni Sahroni

    2015-01-01

    Full Text Available This paper presents the modeling and simulation of offshore wind power platform for oil and gas companies. Wind energy has become the fastest growing renewable energy in the world and major gains in terms of energy generation are achievable when turbines are moved offshore. The objective of this project is to propose new design of an offshore wind power platform. Offshore wind turbine (OWT is composed of three main structures comprising the rotor/blades, the tower nacelle, and the supporting structure. The modeling analysis was focused on the nacelle and supporting structure. The completed final design was analyzed using finite element modeling tool ANSYS to obtain the structure’s response towards loading conditions and to ensure it complies with guidelines laid out by classification authority Det Norske Veritas. As a result, a new model of the offshore wind power platform for 5 MW Baseline NREL turbine was proposed.

  14. Seismic response analyses of turbine hall and electrical building of RBMK-1000 MW type NPP

    International Nuclear Information System (INIS)

    Jordanov, M.J.; Karparov, K.T.

    2003-01-01

    This paper addresses results obtained during the study of turbine hall and electrical building of RBMK-1000 MW pair units at Leningradskaya NPP (LNPP) for seismic event. The study was performed in the frame of the Coordinated Research Program of the International Atomic Agency (IAEA) on Safety of RBMK type Nuclear Power Plants (NPP) in Relation of External Events. A 3-D finite element model of Main Building Complex was developed and seismic response analyses were performed taking into account the soil-structure interaction (SSI). The standard mode superposition method was used for evaluation of dynamic response of structure in time domain. The structure was assumed surface founded at the basemat level. Seismic response analyses were carried out considering shear wave propagation pattern for the input motion. The in-structure time histories and response spectra were generated in referenced locations. Conclusions are drawn for the reliability of the structural response evaluation considering the soil-structure interaction effects. (author)

  15. Design of two-DMD based zoom MW and LW dual-band IRSP using pixel fusion

    Science.gov (United States)

    Pan, Yue; Xu, Xiping; Qiao, Yang

    2018-06-01

    In order to test the anti-jamming ability of mid-wave infrared (MWIR) and long-wave infrared (LWIR) dual-band imaging system, a zoom mid-wave (MW) and long-wave (LW) dual-band infrared scene projector (IRSP) based on two-digital micro-mirror device (DMD) was designed by using a projection method of pixel fusion. Two illumination systems, which illuminate the two DMDs directly with Kohler telecentric beam respectively, were combined with projection system by a spatial layout way. The distances of projection entrance pupil and illumination exit pupil were also analyzed separately. MWIR and LWIR virtual scenes were generated respectively by two DMDs and fused by a dichroic beam combiner (DBC), resulting in two radiation distributions in projected image. The optical performance of each component was evaluated by ray tracing simulations. Apparent temperature and image contrast were demonstrated by imaging experiments. On the basis of test and simulation results, the aberrations of optical system were well corrected, and the quality of projected image meets test requirements.

  16. Two-octave mid-infrared supercontinuum generation in As-Se suspended core fibers

    DEFF Research Database (Denmark)

    Møller, Uffe Visbech; Petersen, Christian Rosenberg; Kubat, Irnis

    2015-01-01

    A more than two-octave mid-infrared supercontinuum with an average output power of 15.6 mW covering 1.7-7.5 μm (1,333-5,900 cm-1) is generated in a low-loss As38Se62 suspended core fiber with core diameter of 4.5 μm....

  17. HTS technology - Generating the future of offshore wind power

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Jens

    2010-09-15

    Superconductive generator design is going to become a real competitive alternative in the future. In general, superconductor design is the most competitive out of Direct Drive Systems and best fulfils the needs of the upcoming market - especially in the offshore market, where WECs with higher nominal power up to 10MW are required. Low weight, high reliability and the very good grid behaviour are the main advantages of the superconductor generator design and will lead to lower costs. The other systems are restricted to a smaller energy output range and / or onshore wind power production business.

  18. Centralized electricity generation in Africa

    International Nuclear Information System (INIS)

    Jaujay, J.

    2000-01-01

    In Africa, over 90 per cent of the suburban and rural populations do not have access to electricity, even if it represents the engine and consequence of change on the continent. A global approach represents the best way to meet the extensive needs of the continent. The author briefly reviewed the recent projects implemented in Africa to meet the increasing demand. Diesel generators were used to satisfy demand in small electrical sectors (less than 1000 MW), hydroelectricity or combustion turbines were used for medium electrical sectors (1000 to 5000 MW). A discussion of the technologies followed, touching on diesel electric stations and combustion turbines. Both methods meet environmental standards as they apply to emission control and noise control. The choice between the two technologies must be based on required unit power, site isolation, access to gas, and the cost of available combustibles. Hydroelectric power has great potential in the sub-Sahara region, and the challenges faced by each project are similar: difficulty in finding the required financing, meeting the environmental constraints, and the distribution of the energy. A modular nuclear reactor project for the generation of electricity is being developed by ESKOM Enterprises, in association with the British Nuclear Fuel Limited and PECCO and progress will be closely monitored. Decision makers must ensure that appropriate decisions are made in a reasonable time frame to allow sufficient time to develop a project to implementation. Demand requirements must be examined closely, technology adequately selected in order to come up with a financing plan. 4 tabs

  19. Mod-5A wind turbine generator program design report. Volume 4: Drawings and specifications, book 5

    Science.gov (United States)

    1984-01-01

    The design, development and analysis of the 7.3 MW MOD-5A wind turbine generator is documented. There are four volumes. This volume contains the drawings and specifications that were developed in preparation for building the MOD-5A wind turbine generator. Detail drawings of several assemblies and subassemblies are given. This is the fifth book of volume 4.

  20. Computation of Superconducting Generators for Wind Turbine Applications

    DEFF Research Database (Denmark)

    Rodriguez Zermeno, Victor Manuel

    The idea of introducing a superconducting generator for offshore wind turbine applications has received increasing support. It has been proposed as a way to meet energy market requirements and policies demanding clean energy sources in the near future. However, design considerations have to take......, to the actual generators in the KW (MW) class with an expected cross section in the order of decimeters (meters). This thesis work presents cumulative results intended to create a bottom-up model of a synchronous generator with superconducting rotor windings. In a first approach, multiscale meshes with large...... of the generator including ramp-up of rotor coils, load connection and change was simulated. Hence, transient hysteresis losses in the superconducting coils were computed. This allowed addressing several important design and performance issues such as critical current of the superconducting coils, electric load...